Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
169-104
• eg Lk.. T2 PR. 33 • Pr6 1 Regg, James B (DOA) From: Regg, James B (DOA) Sent: Wednesday, October 03, 2012 10:33 AM s 'C 1 0 3 1( 7 / To: Bulloch, Kenneth S; DOA AOGCC Prudhoe Bay Cc: Seymour, Len I; Schwartz, Guy L (DOA) Subject: RE: Red Dog #1 and Put River 33 -12 -13 Red Dog #1 (PTD 1982520) Put River 33 -12 -13 (PTD 1691040) Postponing site visits and remediation at Red Dog #1 and Put River 33 -12 -13 until 2013 is acceptable. As noted by Mr. Grimaldi, AOGCC location inspection will be scheduled when remediation is completed Jim Regg AOGCC 333 W. 7th Ave, Suite 100 SCOW Anchorage, AK 99501 �` 907 - 793 -1236 APR 0 8 2.0 From: Bulloch, Kenneth S [mailto: BullocKS @BP.com] Sent: Wednesday, October 03, 2012 4:49 AM To: Grimaldi, Louis R (DOA) Cc: Seymour, Len I; Regg, James B (DOA) Subject: RE: Red Dog #1 and Put River 33 -12 -13 Thanks Lou, we will plan on postponing the site visits until 2013 unless we hear otherwise. Regards, Ken From: Grimaldi, Louis R (DOA) [ mailto :Iou.grimaldk alaska.gov] Sent: Tuesday, October 02, 2012 4:48 PM To: Bulloch, Kenneth S Cc: Seymour, Len I; Regg, James B (DOA) Subject: Re: Red Dog #1 and Put River 33 -12 -13 Ken, I have Cc,d my supervisor Jim Regg on this inspection. I am not aware of specified timing. Lou From: Bulloch, Kenneth S [mailto: BullocKS @BP.com] Sent: Tuesday, October 02, 2012 04:39 PM To: Grimaldi, Louis R (DOA) Cc: Seymour, Len I <Len.SeymourAbp.com> Subject: RE: Red Dog #1 and Put River 33 -12 -13 Mr. Grimaldi, 1 • I am following up on the topic of th• a visits for Red Dog #1 and Put River 33 -12 -13 yourself and Len Seymour had discussed September 22 "d . If this is something that needs to be done this year I feel I had better start trying to making arrangements as soon as possible. Please advise, Ken Bulloch WSL, Special Project Office: 907 - 659 -5580 Cell: 907 - 602 -8149 Harmony: # 2382 Alternate: Len Seymour From: Grimaldi, Louis R (DOA) [mailto:lou.grimaldk alaska.gov] Sent: Saturday, September 22, 2012 6:42 PM To: Seymour, Len I Cc: Regg, James B (DOA) Subject: RE: Red Dog #1 and Put River 33 -12 -13 Mr. Seymour, I appreciate the update on the remediation work on Red Dog #1 and Put River 33- 12 -13. My preferences can't interfere with or dictate changes to work schedules that have been agreed to or are conditional for permits. Permission for continuation of this work or final site clearance (A.O.G.C.C.) until next summer is not a call I can make from my position. I have Cc'd my supervisor, Jim Regg, on this e-mail. Thank you for the notice, Lou Grimaldi From: Seymour, Len I [mailto:Len.Seymour@ bp.com] Sent: Saturday, September 22, 2012 3:17 PM To: DOA AOGCC Prudhoe Bay Cc: AK, D &C Well Services Operations Team Lead; AK, D &C Wells Special Projects; Bill, Michael L (ASRC); AK, D &C Well Integrity Coordinator; Worthington, Aras J Subject: Red Dog #1 and Put River 33 -12 -13 Mr. Grimaldi, this email is to let you know that the Remediation personnel called me today and let me know that they won't be flying out to Red Dog again until next summer for remediation work (still having some helicopter issues). Given our phone conversation two days ago in which you indicated a preference to visit the site after the remediation is completed, I'm assuming that it will be okay for us to not complete the final site clearance visit until next summer after remediation work is completed. Please get back with me to confirm that this acceptable. Len Seymour GWO- Well site leader Office 907 - 659 -5580 Cell 907 - 602 -8149 Harmony - 2382 Alternate — Ken Bulloch 2 • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ' IS Abandoned ❑ Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 Development • ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 5/15/2012 - 169 - 104 • 312 - 036 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 10/31/1969 50 029 - 20047 - 00 - 00 • 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 12/15/1969 PR331213 682' FNL, 755' FEL, Sec. 33, T12N, R13E, UM 8. KB (ft above MSL): 48 15. Field / Pool(s): Top of Productive Horizon: N/A GL (ft above MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 682' FNL, 755' FEL, Sec. 33, T12N, R13E, UM Surface' Surface' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 643370 y- 5981229 Zone- ASP4 9332' 9332' ADL 028278 TPI: x- y- Zone- 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x - 643370 y - 5981229 Zone- ASP4 None 18. Directional Survey: ❑ Yes No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD: DIL / SP, BHCS / GR, LL3, ML / MLL, SNP / GR / C, FDC / C, HRD N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP 1 BOTTOM SIZE CEMENTING RECORD PULLED See Attached 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each interval open (MD +TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET (MD) PACKER SET (MD / TVD) None MD TVD dtEll 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. aUN 0 'LM 't DEPTH INTERVAL (MD)I AMOUNT AND KIND OF MATERIAL USED Surface - 9220' 528.5 Bbls Class 'G', 154 Bbls AS I +� AOGC° 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes 0 No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, • • '• `••• `) • rf� 2 9 and Iab4reto None analytical results per 20 AAC 250.071. (1 RB3DMS JUN 12 1011 :< te Form 10-407 Revised 12/2009 CONTINUED ON REVERSE . e 7,,L.r j,, - j , • t Z ri ' aI 0 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS • NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Ugnu 4200' 4200' None West Sak 5728' 5728' HRZ 7171' 7171' Kalubik 7350' 7350' Sag River 8817' 8817' Shublik 8863' 8863' Sadlerochit 8940' 8940' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Summary of Post Rig Work, Pictures, Well Schematic Diagram 32. I hereby certify that th o oing is correct to the best of my knowledge. Signed: Joe Lastufk / J �+ v , Title: Drilling Technologist Date: J /61/2. PR33121 169 - 104 312 - 036 Prepared By Name/Number. Joe Lastufka, 564 -4091 Well Number Permit No. / Approval No. Drilling Engineer: David Bjork, 564 -5683 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • • WELL NAME: PR331213 23. Attachment - Casing, Liner and Cementing Record Casing Setting Depth MD Setting Depth TVD Hole Size Wt. Per Ft. Grade Top Bottom Top Bottom Size Cementing Record 30" Stove Pipe Surface 91' Surface 91' 250 sx Permafrost 20" 133# / 94# J -55 / H -40 Surface 2195' Surface 2195' 26" 4000 sx Permafrost 16" 65# H -40 Surface 2095' Surface 2095' 13 -3/8" 68 #/61# K -55 Surface 3982' Surface 3982' 17 -1/2" 2120 sx Class 'G' 9 -5/8" 47# L -80 Surface 2388' Surface 2388' Tieback 960 sx Class 'G' 10 -3/4" 55.5# N -80 2381' 2416' 2381' 2416' 12 -1/4" 9 -5/8" 47# N -80 2461' 9293' 2416 9293' 12-1/4" 1500 sx Class 'G' i • • North America - ALASKA - BP Page 1 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) I Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task ! Code NPT NPT Depth ! Phase Description of Operations (hr) (ft) 3/19/2012 00:00 - 01:00 1.00 MOB P PRE WARM UP RIG MOVE SYSTEM. DDI FIELD SUPERINTENDENT ON LOCATION FOR RIG MOVE. NOTIFY MP SECURITY, TOOL SERVICE. PJSM, DISCUSS RIG MOVE SOP. REVIEW ROLES AND RESPONSIBILTIES WITH CREWS. SCS TO BLOCK MP ACCESS ROAD UNTIL REACHING SPINE ROAD. SECURITY WILL TAKE OVER. 01:00 - 05:00 4.00 MOB P PRE JACKUP RIG, MOVE TO PUT RIVER PAD. r- 05:00 - 18:00 13.00 MOB P PRE CONTINUE TO MOVE RIG. - @ 17:00 HRS RIG IS APPROACHING 1ST BRIDGE OF THE KUPARUK RIVER. - NOTIFY AOGCC OF UPCOMING BOP TEST ON PR331213 AT 17:30 HRS. 18:00 - 18:30 0.50 MOB P PRE CROSS MAIN KUPARUK BRIDGE. 18:30 - 19:00 0.5 MOB P PRE PULL OVER AND LET TRAFFIC BY DUE TO FIELD CREW CHANGE . 19:00 - 00:00 5.00 MOB P PRE CROSS LAST KUPARUK BRIDGE. CONTINUE MOVE TO PR PAD. STOP AT CC2 AND TAKE ON FUEL, LET TRAFFIC BY. CONTINUE WITH RIG MOVE. RIG ONTO F -PAD ACCESS ROAD AT 23:30 FIRS. 3/20/2012 00:00 - 03:00 3.00 MOB P PRE CONTINUE WITH RIG MOVE ON F -PAD ACCESS ROAD. TURN ONTO ACCESS ROAD TO PR PAD. TURN ONTO ICE ROAD. ARRIVE ON PR PAD AT 03:00 HRS. 03:00 - 05:30 2.50 MOB P PRE DDI FIELD SUPERINTENDENT ON LOCATION FOR RAISING DERRICK. PJSM, REMOVE REAR BOOSTER. SET BOP STACK IN CELLAR. LAY OUT HERCULITE AND RIG MATS. SPOT SITE CONTROL SHACK ON PR PAD ACCESS ROAD. 05:30 - 11:00 ! 5.50 MOB P PRE CONTINUE TO SPOT HERCULITE & RIG MATS. - PJSM. RAISE DERRICK. 11:00 - 13:30 ! 2.50 MOB P PRE MEETING WITH BOTH CREWS. - BACK TO WORK THEME WITH RON WILSON AND ANDREW HONEA. - SUPERINTENDANT BILL WALTERS AND SAFETY BEN BEARDEN ALSO. - MESSAGE REGARDING WORKING SMART AND USING PROCEDURES. Printed 5/14/2012 11:14:20AM North America - ALASKA = BP Page 2 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 ■ End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. j UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations _ _ ! (hr) (ft) 13:30 - 18:30 5.00 MOB P PRE CONTINUE TO TRUCK AND LAY MATTING BOARDS. - CHECK ALL PRESSURES ON WELLHEAD. - SPOT WELL SITE LEADER SHACK. - WARM UP MOVING SYSTEM AND CHECK FOR LEAKS - FOUND 3/4 " OD MOVING SYSTEM HYDRALIC HOSE ON ODS REAR WHEEL LEAKING 1/2 CUP INTO SELF CONTAINMENT DRIP PLAN - SHUT DOWN HYDRALICS FOR REPAIR, CALL MECHANIC - NOTIFIED SRT 659 -5700 18:30 - 20:30 2.00 MOB N RREP PRE PJSM FOR CHANGING OUT HOSE ON MOVING SYSTEM - LOCK OUT - TAG OUT MOVING SYSTEM REMOVE HYDRAULIC HOSE - MAKE NEW HOSE - RE- INSTALL AND TEST = GOOD 20:30 - 00:00 3.50 MOB P i l PRE SPOT RIG OVER WELL PR 33 -12 -13 - NOTIFY F -PAD OPERATOR PRIOR TO AND AFTER POSITIONING RIG - POSITION RIG OVER WELL FAR ENOUGH TO ALLOW REMOVAL OF VALVE AND REINSTALL _ f BLIND FLANGE WHILE INSIDE OF CELLAR 3/21/2012 00:00 - 06:00 6.00 RIGU P PRE ACCEPT RIG AT 0:00 HOURS PJSM, CONTINUE SPOT RIG OVER WELL - REMOVE VALVE AND INSTALL BLIND FLANGE ON SPOOL - FINAL SPOT RIG - SHIM RIG, SPOT SLOP TANK 06:00 - 08:30 2.50 WHSUR P DECOMP PJSM. INSTALL LIFTING CAP, AND NO TREE TO ADAPTER FLANGE. - FLANGE TO BE BROKEN BEING HEATED WITH STEAM. 08:30 - 12:00 3.50 WHSUR P DECOMP PJSM. N/U 7 V16' X 5M FLANGED TREE CAP - W/ 5 1/2" EUE INTERNAL THREADS. - MAKE UP 5 1/2" EUE 8 RND X 4 1/2" IF CROSS OVER TO TOP OF TREE. - MAKE UP 4 1/2" IF X 4" HT38 DP CROSS OVER AND (1) JT DP. - MAKE UP TO TOP DRIVE, ALL CONNECTIONS TORQUED TO SPECS. - DRAIN DIESEL FROM TREE 12:00 - 14:00 2.00 WHSUR P DECOMP PRE JOB SAFETY MEETING WITH REGARD TO REMOVING SPOOL "D ". - HAZARD ASSESSMENT AND TASK RISK ANALYSIS. - EMPHASIS ON GOOD COMMUNICATION AND STAYING IN SAFE ZONES. - WORK AREAS FLAGGED OFF. 14:00 - 15:30 1.50 WHSUR P ( DECOMP LOOSENED NUTS ON BOTTOM OF "D" FLANGE. - TORQUED 8 RND CONNECTION TO 3500 FT LBS. Printed 5/14/2012 11:14:20AM North 'America - ALASKA - BP Page 3 of 69 Operation Summary Report • Common Well Name: PR331213 j AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. , UWI: Active Datum: 1 : PR 10/31/1969 00:00 ©48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:00 0.50 WHSUR P DECOMP CLEARED AREA AND PULLED IN INCREMENTS TO 115K. - TOP DRIVE WT = 40K, SO 75K OVER PULL. - NO MOVEMENT. SLACK OFF AND APPLY HEAT BACK ON FLANGE. - PULL TO 115K, (75K OVER), AND WORK SEVERAL TIMES. - NO MOVEMENT, CALL OUT FISHERMAN. 16:00 - 18:00 ! 2.00 WHSUR P DECOMP SLACK OFF AND INSTALL PORTAPOWER JACKS. - 180 DEGREES OPPOSITE EACH OTHER, PUSHING UP AGAINST STUDS. - JACKED UP AGAINST STUDS AND SAW MOVEMENT. - PICKED UP WITH BLOCKS, PULLED FREE AGAINST NUTS. - SLACKED OFF AND BACK OFF NUTS. ,18:00 - 22:30 4.50 WHSUR P DECOMP 1 NIPPLE DOWN AND REMOVE "D" SPOOL - CLEAN AND INSPECT EMERGENCY SLIPS - CALL RWO ENGINEER AND DISCUSS PRESENCE OF DIESEL INSIDE 10 3/4 CASING AND IN OA BELOW SLIPS - DECIDE NOT TO TACH WELD SLIPS TO 10 3/4 STUB - CLEAN AND INSPECT RING GROOVE = GOOD, INSTALL NEW API RING M/U NEW "E" SPOOL ADAPTER TO "C" SPOOL 22:30 - 00:00 1.50 WHSUR P i DECOMP RIG UP TEST EQUIPMENT - R/U TEST LINES TO TEST TWC FROM BELOW AND TO TEST "E" SPOOL FLANGE BREAK - UNABLE TO REMOVE 8 RND CONNECTION CROSSOVER FROM TREE CAP FLANGE 3/22/2012 100:00 - 02:00 2.00 WHSUR P DECOMP CONTINUE TEST OF TWC - TEST TWC FROM BELOW AND TEST "E" 1 SPOOL ADAPTER FLANGE AT SAME TIME 1- 250 PSI LOW 5 MINUTES, 1000 PSI HIGH 30 ;MINUTES, CHARTED 02:00 - 03:00 1.00 WHSUR P DECOMP i PJSM, REMOVE TREE CAP FLANGE FROM TUBING SPOOL ADAPTER WITH CROSSOVER TORQUED UP - WILL SEND TO BAKER TO REMOVE AND INSPECT - REMOVE TREE CAP FLANGE FROM TREE AND INSTALL ON TUBING SPOOL ADAPTER - R/U TEST EQUIPMENT TO TEST TWC - TEST TWC FROM ABOVE 250 PSI LOW, 3500 PSI HIGH, 5 MINUTES CHARTED - R/D TEST EQUIPMENT 03:00 - 04:30 1.50 WHSUR P DECOMP PJSM, N/p TUBING SPOOI Af1APTFR - INSPECT THREADS IN HANGER CHECK THREADS WITH 7" TC2 CROSSOVER, 7 TURNS TO THE R IGHT_ 04:30 - 06:00 1.50 WHSUR 1 P DECOMP PJSM. N/U BOP STACK N/U SPACER SPOOL N/U BOPE 06:00 - 13:00 7.00 WHSUR j P DECOMP CONTINUE TO N/U 13 5/8" X 5M BOPE. I- C/O RAMS TO 103/4" PIPE RAMS ON TOP. —__ ;- 3 12" X 6" PIPE RAMS ON BOTTOM. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP 111110 Page 4 of 69 Operation Summary Report Common Well Name: PR331213 AFE No W Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) 1 Site: EX PR331213 Rig Name /No.: DOYON 16 I Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ( Description of Operations (hr) (ft) 13:00 - 15:30 2.50 WHSUR P DECOMP PJSM. RIG UP HARDLINE TO SLOP TANK. - SPOT UP LITTLE RED. 15:30 - 17:00 1.50 WHSUR P DECOMP PJSM. RIG UP LITTLE RED LINES. - PRESSURE TEST HARD LINE TO 1000 PSI, OK PRESSURE TEST LITTLE RED LINE TO 2000 PSI, OK. - BOTH TESTS, 5 MIN / CHARTED. 17:00 - 17:30 0.50 WHSUR j P 1 j DECOMP OPEN OOA VALVE TO PUMP DOWN AND 000A VALVE TO TAKE RETURNS. - BRING ON PUMP, PUMPING HEATED DIESEL. PRESSURED UP TO 550 PSI IMMEDIATELY, TOTAL PUMPED .14 BBLS. - PRESSURE HOLDING SOLID ... „MAKE CALL TO TOWN ENGINEER. - DECISION MADE TO BLEED ALL PRESSURE, CLOSE IN WELL AND R/D LITTLE RED. 17:30 - 18:30 1.00 WHSUR P 1 DECOMP RIG DOWN LITTLE RED PUMPING SERV. - BLOW DOWN LINES I -RIG DOWN CELLAR EQUIPMENT 18:30 - 19:30 1.00 WHSUR P DECOMP CONTINUE N/U BOP STACK - INSTALL RISER AND MOUSE HOLE 19:30 - 20:30 1.00 WHSUR P j DECOMP HELD RIG EVACUATION DRILL WITH "C" CREW - >2 MIN RESPONSE TIME - ALL PERSONEL PRESENT 1 - HELD AFTER ACTION REVIEW (AAR) WITH IALL RIG HANDS, TOOL PUSHER, SCS, AND WSL REVIEWED EXIT ROUTE SCENARIOS AND RE -ENTRY AUTHORITY 20:30 - 21:30 1.00 WHSUR P DECOMP R/U BOPE TEST EQUIPMENT - M/U AND INSTALL TEST JOINT - M/U FLOOR VALVES FOR TEST 21:30 - 00:00 2.50 WHSUR P DECOMP TEST 13 -5/8" BOPE AND CHOKE MANIFOLD - TEST BOPE PER WELL PLAN, PERMIT TO DRILL, AND AOGCC REGS i� 1- TEST BOP RAMS, CHOKE VALVES, AND J FLOOR VALVES TO 250 PSI LOW AND 3500 �( I PSI HIGH / - TEST HYDRILL TO 250 PSI LOW AND 3500 PSI HIGH - TEST USING 4" TEST JOINT j - PRESSURE TEST FOR 5 CHARTED MIN EACH. - ALL TEST FOLLOW TESTING CRITERIA DOCUMENTED IN CRT - AK -10 -45 - GAS ALARMS, PIT VOLUME TOTALIZERS AND FIRST TWO BOPE TESTS ONLY, WERE WITNESSED BY JEFF JONES OF AOGCC Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 5 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) I Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 3/23/2012 00:00 - 06:00 6.00 WHSUR P DECOMP CONTINUE TEST 13 -5/8" BOPE AND CHOKE MANIFOLD I ! , -TEST BOPE PER WELL PLAN, PERMIT TO DRILL, AND AOGCC REGS - TEST BOP RAMS, CHOKE VALVES, AND FLOOR VALVES TO 250 PSI LOW AND 3500 PSI HIGH [- TEST HYDRILL TO 250 PSI LOW AND 3500 PSI HIGH I - PRESSURE TEST FOR 5 CHARTED MIN EACH - TEST USING 4" TEST JOINT - TEST UPPER RAMS WITH 10 3/4" TEST JOINT - ALL TEST FOLLOW TESTING CRITERIA DOCUMENTED IN CRT - AK -10 -45 - GAS ALARMS, PIT VOLUME TOTALIZERS ! AND FIRST TWO BOPE TESTS ONLY, WERE WITNESSED BY JEFF JONES OF AOGCC - OTHER TESTS WITNESSED BY DDI TOOLPUSHER AND WSL 06:00 - 06:30 0.50 WHSUR N HMAN DECOMP INVESTIGATE WHY PRESSURE DROPPED OFF DURING TESTING OF 10 3/4" PIPE RAMS. 1- ATTEMPT TO BREAK TEST JT OUT OF ;TUBING HANGER,(TIGHT). - OPT TO PULL TUBING HANGER AND CHECK THINGS OUT. - PRIMARY BARRIER, UN PERFORATED CASED AND CEMENTED WELL BORE. - SECONDARY BARRIER, TESTED BRIDGE PLUG @ 2523'. - CALLED ENGINEER AND AGREED TO PULL TUBING HANGER. 06:30 - 07:00 0.50 WHSUR N HMAN DECOMP PRE JOB SAFETY MEETING ON PULLING 1TUBING HANGER. DISCUSS IMPORTANCE OF CHECKING WELLHEAD FOR PRESSURE / FLOW. - USE GOOD COMMUNICATION TECHNIQUES. i 07:00 - 08:30 1.50 WHSUR N HMAN DECOMP CALL OUT FMC. USE DIAPHRAGM PUMP TO 1 PUMP WATER OUT OF TEST JT. - LOOK DOWN TEST JT, OBSERVE APPARENT COLLAPSE. - MAKE NECESSARY PHONE CALLS. 08:30 - 11:30 3.00 WHSUR N HMAN DECOMP CONDUCT IN DEPTH SAFETY MEETING / HAZARD ASSESSMENT OF OPERATION. - OPEN VA VALVE, OBSERVE PENCIL THIN FLOW OF DIESEL - DRAIN VA INTO 5 GALLON BUCKET 18 GAL / (1) HOUR. - RIG UP 2" HOSE TO VA AND TO SLOP TANK. - TOOL PUSHER CHANGE OUT DAY. - ORDER NEW TEST JT TO BE MADE AT BAKER MACHINE. Printed 5/14/2012 11:14:20AM 0 North America - ALASKA - BP illi Page 6 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) I Start Date: 3/19/2012 ! End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) 1 Project: Prudhoe Bay (various) I Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To I Hrs Task Code 1 NPT I NPT Depth Phase j Description of Operations (hr) I I (ft) 11:30 - 14:00 2.50 WHSUR I N HMAN j DECOMP MONITOR WELL W/ I/A OPEN TO SLOP TANK. - DIESEL GOING IN TO LINE, BUT NOT ENOUGH FLOW / PRESSURE TO GET IT TO SLOP TANK. - AFTER (1) HOUR BLOW DOWN LINE AND OBSERVE SMALL AMOUNT OF DIESEL AT SLOP TANK. - MONITOR FOR ANOTHER HOUR, NO FLOW TO SLOP TANK. ;14:00 - 14:30 0.50 WHSUR N HMAN DECOMP PRE JOB SAFETY MEETING WITH NEW TOOL PUSHER AND CREW. - DISCUSS IMPORTANCE OF GOING SLOW ;AND PAYING ATTENTION. 14:30 - 17:00 2.50 1 WHSUR N I HMAN DECOMP BOLDS & PULL 103/4" TEST JT TO FLOOR. - OBSERVE SOME DRAG (25K) IN SOME AREAS. - BREAK OFF CROSSOVERS AND TBG — ' I HANGER FROM TEST JT. 1 17:00 - 17:30 0.50 WHSUR N HMAN DECOMP I PJSM W/ CREW. I - SET TEST PLUG IN WELLHEAD. _- 17:30 - 18:00 0.50 WHSUR P DECOMP ' COMPLETE SAFETY CRITICAL WORK ORDERS ON TOP DRIVE 118:00 - 00:00 6.00 WHSUR P 1 DECOMP CONTINUE BOPE TEST , 1 - CALLED JEFF JONES TO GIVE UPDATE ON TESTING, HE DECIDED TO WITNESS THE ! I I COMPLETION OF THE TEST - M/U NEW 10 3/4 "PORTED" TEST JOINT, RIH LAND SCREW INTO TEST PLUG I - COMPLETE BOPE TEST - TEST 10 3/4" UPPER PIPE RAMS, #1 CHOKE VALVE, HCR CHOKE, AND MANUAL CHOKE VALVES - TEST TO 250 PSI P H PRESSURE TEST FOR LOW AND 5 CHARTED 3500 SI MINUTES EACH !- TEST SUPER -CHOKE = GOOD - TEST MANUAL ADJUSTABLE CHOKE = FAILED TO HOLD PRESSURE 1 - CALLED MECHANIC OUT TO REPAIR I MANUAL CHOKE 1 - TESTS WITNESSED BY JEFF JONES OF 1 AOGCC, DDI TOOLPUSHER AND WSL I I PERFORM KOOMEY TEST: INITIAL PRESSURES: - SYSTEM = 2850 PSI 1- MANIFOLD = 1500 PSI I - ANNULAR = 750 PSI IAFTER FUNCTION: - SYSTEM = 1650 PSI I - 200 PSI INCREASE = 17 SEC - FULL PRESSURE = 89 SEC (6) N2 BOTTLES = 2000 PSI EACH Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 7 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) 'Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. 1 UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 3/24/2012 00:00 - 02:30 2.50 BOPSUR P DECOMP , RIG DOWN TEST EQUIPMENT PULL AND R/D 10 3/4" TEST JOINT AND CROSSOVERS - UD SAME - PULL TEST PLUG - INSTALL WEAR BUSHING, WEAR BUSHING ID = 8.875 j- RIG MECHANIC REMOVED AND DISASSEMBLED MANUAL CHOKE - FOUND THAT CHOKE SEAT WAS BROKEN - DDI DAY TOOLPUSHER NOTIFIED AND BEGAN LOCATING PARTS i I - NOTIFIED BP WTL - DISCUSSED MAKING UP STANDS AND STANDING BACK IN DERRICK WITH BP WTL, DDI, AND JEFF JONES OF AOGCC 1- RECEIVED APPROVAL FROM BP WTL TO MAKE UP STANDS, BUT NO WELL WORK TO 'PROCEED UNTIL CHOKE IS REPAIRED 02:30 - 06:00 3.50 FISH P DECOMP I PJSM, PICK UP DRILL PIPE AND STAND BACK IN DERRICK PERFORM HAZARD ASSESSMENT - PREPARE PIPE SHED, MOVE COLLARS - CREW WILL MAKE UP AND STAND BACK 5 STANDS AND THEN STOP AND CHECK ALL EQUIPMENT BEFORE PROCEEDING - CONTINUE TO STAND BACK DRILL PIPE 06:00 - 11:00 5.00 FISH P DECOMP CONTINUE TO RIH, 3 JTS AT A TIME, DRIFTING EACH JT AND STANDING BACK. - STOOD BACK A TOTAL OF 3236' OF 4" HT -38 DRILL PIPE. - D1 DRILL WITH AAR DURING THIS OPERATION. 11:00 - 13:30 2.50 FISH P DECOMP SAFETY MEETING W/ VP OPERATIONS GREG MADSEN i I - ALSO SUPERINTENDANT RICH BURNETT - HIGHLIGHT .. KNOW YOUR BARRIERS. - BOTH CREWS W/ PRE TOUR AND WALK AROUND. 13:30 - 22:30 9.00 FISH P ! DECOMP PJSM. CONTINUE TO PICK UP 4" DP AND STAND BACK. - MONITOR WELL, WELL STABLE. - CALLED JEFF JONES OF AOGCC AT 18 :45 TO GIVE UPDATE ON CHOKE - JEFF CALLED BACK AT 20:15 AND TOLD US TO TEST AND CHART IT, AND E -MAIL HIM THE RESULTS 22:30 - 00:00 1.50 BOPSUR N RREP DECOMP PJSM, INSTALL SPOOL AND ADJUSTABLE MANUAL CHOKE - CONDUCT HAZARD ASSESMENT - SPOOL WAS CRACK CHECKED, X- RAYED, I AND DOCUMENTED 3/25/2012 00:00 - 06:00 6.00 BOPSUR N RREP DECOMP CONTINUE INSTALL SPOOL AND ADJUSTABLE MANUAL CHOKE - R/U TEST EQUIPMENT AND CHART RECORDER Printed 5/14/2012 11:14:20AM 0 North America - ALASKA - BP Page 8 of 69 Operation Summary Re Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) j Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 09:00 3.00 BOPSUR N 1 RREP DECOMP PRESSURE TEST MANUAL CHOKE, j ASSOCIATED FLANGES. � I - PRESSURE TEST @ 5000 PSI, 5 MIN. I- SLIGHT DRIP, RETIGHTEN FLANGES. 1 - GET GOOD 5 MIN TEST @ 5000 PSI / CHARTED. - FUNCTION TEST CHOKE W/ 1500 PSI (2) � I TIMES, OK. RIG DOWN TEST EQUIPMENT. ' - B/D CHOKE MANIFOLD AND KILL LINE, CLEAR / CLEAN RIG FLOOR. 09:00 - 09:30 0.50 i CASING P DECOMP PJSM W/ BAKER HAND ON PICKING UP BHA. - EMPHASIS ON PROPER COMMUNICATION I 1 - PROPER TORQUE, LOOKING UP AND HAND _ PLACEMENT. ■ 09:30 - 14:00 4.50 CASING P j DECOMP , UP 4 13/16" OD SWEDGING BHA. INCLUDING SWEDGE, (1) 43/4" DC, (2) 6 V4" 1 I 1 BUMPER SUBS - DAILY UP AND DOWN JAR, (9) 6 114" DRILL COLLARS - 6 1/4" INTENSIFIER & ALL NECESSARY X/OS. 1 -- I OAL385.42'. 14:00 14:30 1 0.50 CASING P DECOMP 1 PJSM. RIH W/ SWEDGING BHA ON 4' HT 38 :DP. _4 ' - TAG UP @ 821' 68K UP WT, 70K DOWN WT. 14:30 - 16:00 1.50 CASING P j DECOMP PJSM. M/U TOP DRIVE. 1 I - BREAK CIRCULATION W/ 8.6 PPG HEATED SEAWATER. - NOTICE INITIAL PUMP PRESSURE SURGE 1 (100 PSI), AND SLIGHT PIPE JUMP. I- SUSPECT ICE PLUG IN END OF SWEDGE. 1 1 1 - 125 DEG IN, PUMP 4 BPM, 30 PSI. DISPLACE DIESEL OUT TO SLOP TANK. - 88 DEGREES SEAWATER COMING BACK. 16:00 18:30 I 2.50 CASING 1 P ' DECOMP CONDUCT PRE JARRING DERRICK INSPECTION, OK. - BREAK OFF / BLOW DOWN TOP DRIVE. - RIH AND SEE NO RESISTANCE UNTIL 861' - TAG SOLID 861' WITH 10K DOWN WT. ■ - END OF SWEDGE TO 6 V4" OD = 37 112'. 1 , '; BREAK CIRCULATION W/ 125 DEGREE SEAWATER. 1 I I - CALL ODE AND REVISE PLAN FORWARD. - AGREE TO CIRCULATE, GET DIESEL OUT, HEAT UP HOLE AND POOH. - WILL PULL TO 4 3/4" COLLAR AND AND (8) MORE. - - - -- --- — - - --- -- - -- - - - - - -- 18:30 - 20:00 1.50 CASING P 1 DECOMP PJSM, MONITOR WELL FOR 10 MIN = STATIC - POOH FROM 861' TO COLLARS 1 - MONITOR WELL - STAND BACK 6 114" COLLARS, UD JARS !- PULL SWAGE TO FLOOR, OBSERVE SCRATCH MARK ON SWAGE AT 3" OD AREA, 1 3" UP FROM 2" OD END 20:00 - 21:30 1.50 CASING P DECOMP PJSM, M/U FISHING BHA #2 - RIH WITH 4 13/16" OD SWAGE - PICK UP 8 ADDITIONAL 4 3/4 DRILL COLLARS 1X1 I i - P/U JARS AND BUMPER SUBS 1 - RIH W/6 114 COLLARS AND DP FROM I !DERRICK to 861' MD Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 9 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs ! Task Code NPT ! NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 22:00 ( 0.50 I CASING P DECOMP I RIH WITH 4" DP FROM DERRICK PUWT = 75K, SOWT = 80K - PJSM ON JARRING - CONDUCT HAZARD RECOGNITION WORKSHEET - WILL STOP AND INSPECT DERRICK EVERY 1 TO 2 HOURS DURING JARRING OPERATIONS 22:00 - 00:00 2.00 CASING P DECOMP ' BEGIN SWAGING 103/4" CASING WITH 4 13/16" OD SWAGE - JAR DOWN WITH 40K DOWN WEIGHT - JAR / SWAGE FROM 861' TO 866' MD FELL THROUGH TIGHT SPOT, CONTINUED _ DOWN HOLE 5' TO 871' MD I I 3/26/2012 00:00 - 01:30 1.50 j CASING P DECOMP 1 PJSM ON JARRING, CONDUCT HAZARD RECOGNITION WORKSHEET - PERFORM DERRICK INSPECTION - CREW HELD WEEKLY SAFETY MEETING PRIOR TO COMING ON TOUR, FOCUSED DISCUSSION ON DROPPED OBJECTS AND JARRING PROCEDURES -OA, 00A, 000A PRESS URES ARE ALL "0" PSI 01:30 - 02:30 1.00 CASING P DECOMP CONTINUE TO WORK 4 13/16" OD SWAGE THROUGH TIGHT SPOT FROM 861' TO 866' MD TAKING 3 JAR HITS DOWN TO GET 'THROUGH WITH 40K DOWN WT ON JAR 1- 3 JAR HITS UP TO GET BACK OUT, WITH 75K STRAIGHT OVERPULL - SLACK DOWN 5 FEET PAST TIGHT SPOT TO 871' MD WITH MINIMAL DRAG 02:30 - 03:15 0.75 CASING P DECOMP CIRCULATE WARM SEAWATER SURFACE TO SURFACE AT 3 BPM = 50 PSI - WORK THROUGH TIGHT SPOT WHILE CIRCULATING '- GETTING FULL DIESEL RETURNS 03:15 - 04:00 0.75 CASING P DECOMP ! STOP CIRCULATING, BLOW DOWN TOP ' DRIVE - JAR 3X TO GET THROUGH TIGHT SPOT FROM 861' TO 866' MD - CONTINUE DOWN HOLE FROM 866 TO 915' MD - TAKING AN INCREASING AMOUNT OF DRAG TO SLACK OFF, —20K DOWN WEIGHT - TAKING 15K DRAG / OVERPULL TO COME UP STILL JARRING THROUGH 861' AREA TO GET OUT 04:00 - 07:00 3.00 CASING P DECOMP POOH TO CHANGE TO 5 15/16" OD SWAGE - MONITOR WELL, WELL IS STABLE. - POOH, STAND BACK DP & DRILL COLLARS. 07:00 - 07:30 0.50 CASING P DECOMP CLEAR / CLEAN RIG FLOOR. 07:30 - 09:00 1.50 CASING P DECOMP PJSM. C/O SWAGES FROM 4 13/16" TO 5 15/16" OD. FISHING BHA #3 - M/U 2ND SWAGING BHA WITH 5 15/16" OD T SWAGE Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 10 0169 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 13:00 4.00 CASING P DECOMP RIH ON 4" DP, TAG, (HARD), @ 862'. - 68K UP WT, 70K DOWN WT. 1- BREAK CIRCULATION W/ HEATED 1 SEAWATER, 3 1/2 BPM / 60 PSI. '- CIRCULATE UNTIL CLEAN SEAWATER RETURNS. - NO GAINS OR LOSSES WHILE CIRCULATING. - CONDUCT PRE JARRING DERRICK 1 INSPECTION W/ CIRCULATING. 13:00 - 15:30 ! 2.50 1 CASING P DECOMP PJSM. COMMENCE SWAGING OPERATION. - DOWN JAR F/ 862'- 872', APPROXIMATELY 5' / HR. - WORK AREA SEVERAL TIMES AROUND 868', SEEING 50K DRAG IN THAT AREA. 15:30 - 16:00 0.50 CASING P DECOMP RIH TO 1087' W/ NO ISSUES OR BUMPS. - TAG UP HARD @ 1087'. I - NOTE: OA, OOA AND 000A ARE ALL ON A I � MEDIUM VACUUM. - TOWN ODE NOTIFIED. 16:00 - 17:30 1.50 CASING P DECOMP PJSM. M/U TOP DRIVE. I BREAK CIRCULATION, CIRCULATING 95 DEGREE SEAWATER © 3 BPM / 60 PSI. CIRCULATE UNTIL CLEAN SEAWATER I RETURNS AND CONTINUE TO CIRC. - COMPLETE DERRICK INSPECTION W/ CIRCULATING. - BLOW DOWN TOP DRIVE, FLOW CHECK WELL, WELL STATIC. 17:30 - 19:00 1.50 CASING P DECOMP PJSM. COMMENCE SWAGING OPERATION AT 1087' MD - PUWT = 75K, SOWT = 80K - SWAGE 10 3/4" CASING WITH 5 15/16" OD SWAGE - JAR DOWN WITH 40K DOWN WT ON JAR - JAR THROUGH TIGHT SPOT FROM 1087' TO 1093' MD - WORK THROUGH TIGHT SPOT 3X - RIH FROM 1093' TO 1147' MD = SWAGE DEPTH - BOTTOM OUT ON 6 1/4" COLLAR CROSSOVER AT 861' 19:00 - 21:00 j 2.00 CASING P DECOMP RIG UP TO CIRCULATE - PERFORM DERRICK INSPECTION - PUMP 108 DEGREE SEA WATER SURFACE TO SURFACE - 3 BPM =60 PSI - MONITOR RETURNS = NO GAINS, NO LOSSES - BLOW DOWN TOP DRIVE - MONITOR WELL = STATIC 21:00 - 22:00 1.00 CASING 1 P DECOMP PJSM, PULL OUT OF HOLE - STAND BACK 4" DP AND 6 1/4" COLLARS 22:00 - 23:30 1.50 CASING P DECOMP LAY DOWN 4 3/4" COLLARS 1X1 - UD 5 15/16" SWAGE Printed 5/14/2012 11:14:20AM Page 11 of ss North America - ALASKA - BP Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 ©48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 23:30 - 00:00 0.50 CASING P DECOMP RIG CREW EVACUATED THE RIG TO SAFE BRIEFING AREA DUE TO H2S GAS ALARM - ALL BHA WAS OUT OF THE HOLE AND HOLE COVER WAS ON - ALARM SOUNDED AND THE DRILLER SECURED THE WELL BY CLOSING THE BLIND RAMS - ALL HANDS EVACUATED THE RIG AS WELL AS SERVICE HANDS AND TRUCK DRIVERS TO THE CORRECT SAFE BRIEFING AREA - TOURPUSHER AND DRILLER DONNED AIR PACKS AND MONITORED ALARM PANEL, WHICH WAS READING "0" PPM AND PROCEEDED TO SWEEP THE RIG WITH HAND HELD MONITOR - SCS ARRIVED AT SAFE BRIEFING AREA AND ENSURED ALL PERSONAL WERE ACCOUNTED FOR - ALL READINGS WERE "Cr PPM ON MAIN ALARM PANEL AS WELL AS HAND HELD SWEEP OF THE RIG - WSL RE- ENTERED THE RIG AND WITH TOURPUSHER, GAVE THE ALL CLEAR TO THE HANDS, SUSPECT FALSE ALARM - WSL NOTIFIED OPS SUPERINTENDENT RICH BURNETT, RICH WILL NOTIFY TEAM LEADER JIM WILLINGHAM 3/27/2012 00:00 - 02:00 2.00 CASING P DECOMP RIG WAITING ON AUTHORIZATION TO PROCEED FROM OPS SUPERINTENDENT JIM WILLINGHAM j- DUE TO H2S ALARM AND RIG EVACUATION 1- RIG ELECTRICIAN WAS CALLED TO RIG TO VERIFY ALARM SENSORS WERE WORKING PROPERLY 02:00 - 02:30 0.50 CASING P j DECOMP RECIEVED ALL CLEAR TO OPEN WELL FROM JIM WILLINGHAM AND STEVE ROSSBERG - OPENED UP TO CHOKE AND GAS BUSTER - CHECKED VENT WITH HAND HELD MONITOR = "0" PPM - OPENED BLIND RAMS - CHECKED PITCHER NIPPLE WITH MONITOR = "0" PPM - CONDUCT DERRICK INSPECTION 02:30 - 03:00 0.50 CASING P DECOMP LAY DOWN 5 15/16" OD SWAGE I- BLOW DOWN CHOKE AND KILL LINES 03:00 - 06:00 3.00 CASING P DECOMP 1 PJSM, M/U FISHING BHA #4 = 7" SWAGE RIH WITH BUMPER SUBS AND 6 1/4 COLLARS - M/U FIRST STAND OF DP AND CIRCULATE SEAWATER TO BALANCE OUT FLUID IN HOLE Printed 5/14/2012 11:14:20AM North America - ALASKA -`BP 4110 Page 12 of 69 Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. 1 UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 06:00 - 09:00 3.00 CASING ! P DECOMP PJSM. RIH TO 861', TAG HARD. - LITTLE RED PRESSURE TEST LINES TO OOA, 1000 PSI, OK - MONITOR 10 3/4 ", PENCIL THIN STREAM OUT FLOW, TOWN NOTIFIED. PUMP DOWN OOA W/ LITTLE RED, 90 DEGREE DIESEL. - PUMP 2 BPM / 17 PSI, FULL RETURNS UP 000A AFTER PUMPING 1 BBL. - PUMP TOTAL OF (6) BBLS W/ LITTLE RED, SHUT DOWN, CLOSE IN OOA & 000A. 1- PENCIL THIN OUT FLOW OF 10 3/4" REMAINED SAME THROUGHOUT PUMPING. - - -- — - -- - - - - - -- - -- - - -- - -- 09:00 - 11:00 j 2.00 CASING P DECOMP CIRCULATE 10 3/4" CASING FROM 861', 3 BPM 60 PSI. - CIRCULATE AT LEAST (3) BTMS UP FROM 861', CLEAN SEAWATER RETURNS. j- LITTLE RED RIGGING UP ON OA AND PRESSURE TESTING LINE, OK. SHUT DOWN RIG PUMP AND MONITOR WELL 15 MIN. - BREAK OFF / BLOW DOWN TOP DRIVE, INSTALL SAFETY VALVE. - CLOSE IN AND MONITOR WELL, WELL STABLE. - BRING ON LITTLE RED, PUMPING 90 DEGREE DIESEL DOWN OA. - IMMEDIATE RETURNS UP 10 3/4" CASING, SHUT DOWN AFTER PUMPING .18 BBLS. - NOTIFY ODE, RIG DOWN LITTLE RED AND PREPARE TO SWAGE @ 861'. 11:00 - 19:00 8.00 CASING P DECOMP BEGIN SWAGING WITH 7" OD SWAGE FROM 862' MD - PUWT = 65K, SOWT = 75K !- SWAGE WITH 40K DOWN WEIGHT F/862' 1T/863' - PERFORM DERRICK INSPECTION AT 15:00 HOURS - CONTINUE TO SWAGE / JAR F/863' T/865' - PERFORM DERRICK INSPECTION AT 15:00 HOURS - CONTINUE TO SWAGE / JAR F/865' T/867' UNABLE TO PROCEED DUE TO HYDRAULIC ;JAR FAILURE _ ( CALL TOWN ODE 19:00 - 21:30 2.50 CASING j P DECOMP PERFORM DERRICK INSPECTION - INSPECTION FOUND HYDRAULIC LEAK ON TOP DRIVE DUE TO JARRING - CALLED OUT MECHANIC AND REPAIRED LEAK 21:30 - 23:00 ! 1.50 CASING P DECOMP CIRCULATE 103/4 CASING AT 867' - CIRCULATE 135 DEGREE SEA WATER AT 3 BPM = 50 PSI - CONDUCT AAR WITH RIG CREW, DDI TOUR ;PUSHER AND WSL ON H2S AND RIG EVACUATION PROCEDURES AND "TAKE AWAYS' I I - OA = 45 PSI, 00A = 0 PSI, 000A = 0 PSI Printed 5/14/2012 11:14:20AM North America - ALASKA - BP 1110 Page 13 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 CASING P DECOMP PJSM, POOH WITH 7" OD SWAGE BHA - BLOW DOWN TOP DRIVE - MONITOR WELL 10 MINUTES = STATIC - POOH FROM 867' TO BHA - MONITOR WELL 10 MINUTES = STATIC 3/28/2012 00:00 - 02:00 j 2.00 CASING P DECOMP PJSM, SPCC CHECKS - MONITOR WELL 10 MINUTES = STATIC - STAND BACK 6 1/4" COLLARS - L/D JARS AND BUMPER SUBS - UD 7" SWAGE DECOMP 02:00 - 03:00 1.00 CASING P fi CLEAN CLEAR FIR FLOOR - MOBILIZE BHA #5 TO RIG FLOOR 1- SPREAD HERCULITE FOR ARCTIC CIRC. OUT TANK - LOAD, RABBIT AND STRAP 95/8" CASING 03:00 - 06:00 3.00 j CASING P DECOMP 1 PJSM, M/U BHA #5 = MULE SHOE - M/U MULE SHOE AND (2) 4 3/4 COLLARS - RIH FROM SURFACE CHECK PRESSURES ON OA'S AT 0:300 OA = 30 PSI, OOA = 0 PSI, OOOA = 0 PSI_ 06:00 - 07:00 ! 1.00 CASING P DECOMP TAGGED TOP OF CIBP a 2529' MD WITH 3 1/2" MULE SHOE. -NO FILL. -NO TIGHT SPOT NOTED. - PUW =73K, SOW =8OK. 07:00 - 08:30 1.50 CASING P DECOMP PJSM, CIRCULATE SURFACE TO SURFACE -WITH HEATED SEAWATER -3 BPM / 60 PSI - 120 DEG IN, TILL 60 DEG OUT. ! -NO GAINS, NO LOSSES. -A FEW BBLS OF DIRTY FLUID FROM THE TOP OF CIBP. 08:30 - 09:00 0.50 CASING P DECOMP P/U TO 2497' MD - MONITOR WELL STATIC FOR 10 MINUTES. ;-BLOW DOWN TOP DRIVE. 09:00 - 12:00 3.00 CASING P DECOMP PJSM / THA, DUMP 250 LB 20 / 45 RIVER SAND DOWN THE 4" DP. -TEST HARD LINE TO THE FLOW BACK TANK 250 / 3500 PSI. ! -OOA AND THE 000A BOTH AT '0' PSI WITH IA THERMAL VAC THAT STOPS IN A FEW SECONDS. -OVER 30 MINUTES WITH THE OA OPEN TO THE FLOW BACK TANK, THE KWF CONTINUES TO 'U' -TUBE FROM THE 10 3/4" CSG. NO GAS WAS NOTED ONLY DIESEUCRUDE. 12:00 - 14:00 2.00 CASING P DECOMP P/U TO2440' MD -PUMP A DP VOLUME TO CLEAR DP OF SAND. -1.5 BPM / 30 PSI j ! -WAIT 15 MINUTES AND TAG TOP OF SAND @ 2525' MD WITH THE MULE SHOE. - THE OPEN OA CONTINUES TO 'U' -TUBE TO THE 103/4" CSG. j HAT A RATE LESS THEN 1 BPH. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 14 of 69 Op Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM , Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 14:00 - 16:30 2.50 CASING P DECOMP , POH FROM 2525 MD WITH BHA #5 - PUW =65K SOW =85K - MONITOR WELL STATIC AT THE BHA. - SHUT -IN THE OA. -P /U (1) MORE 43/4" DC AND RACK BACK IN DERRICK. -UD MULE SHOE. ( -NO GAINS NO LOSSES. 16:30 - 18:30 2.00 CASING P DECOMP PJSM, M/U BAKER CUTTER BHA #6 - M/U 5 1/2" MULTI - STRING CUTTER DRESSED TO CUT 10 3/4" CASING - RIH WITH 9) 4 3/4" COLLARS AND 9) 6 1/4 I COLLARS 1- 18:00 HRS: NOTIFIED AOGCC OF BOPE TEST, JOHN CRISP WITH AOGCC WAIVED STATES' RIGHT OF WITNESS 18:30 - 19:00 0.50 CASING P DECOMP I RIH WITH 4" DP TO 1110' MD MONITOR RETURNS 19:00 - 20:00 ( 1.00 j FISH P DECOMP 1 PJSM FOR CASING CUT AND CIRC OUT OF OA - LOCATED CASING COLLAR AT 1120' MD - DROPPED DOWN 10' AND LOCATED CUTTER AT 1130' MD PJSM WITH RIG CREW DDI TOOLPUSHER, ' VAC TRUCK DRIVERS, TRUCK PUSHER, AND WSL I � - DISCUSSED HAZARDS, SPCC, !COMMUNICATIONS, ASSIGNED STATIONS, AND THE ABILITY TO STOP THE OPS AT ANY 'TIME - 2 BARRIERS IN PLACE INCLUDE CEMENTED 9 5/8" UNPERFORATED CASING AND TESTED ! CIBP AT 2529' MD 20:00 - 20:45 0.75 FISH P DECOMP CUT 103/4" CASING AT 1130' MD, - RPM = 60, FREE TORQUE = 2K, - PUMP PSI FROM 3.5 BPM = 370 PSI, TO 7 BPM = 11 PSI - AFTER CUT, 7.2 BPM = 340 PSI - VERIFY CUT WITH CUTTER KNIVES = GOOD 20:45 - 21:00 0.25 CASING P DECOMP TEST CASING TO 500 PSI - R/U CHART - CLOSE ANNULAR AND OPEN KILL LINE ,- PUMP DOWN PIPE AND THROUGH KILL LINE - TEST 133/8 CASING TO 500 PSI FOR 5 I MINUTES, CHARTED - TEST GOOD 21:00 - 23:00 2.00 CASING j P DECOMP BEGIN TO CIRCULATE OA TO FLOW TANK - OPEN UP TO FLOW TANK, - FLUID DID NOT FLOW, OR "U- TUBE ", UNTIL PUMPS WERE ON, THEN FULL FLOW WITHIN A FEW BBLS - PUMP AT 3 BPM = 120 PSI: - 50 BBLS OF 100 DEGREE SEAWATER - 100 BBLS OF 120 DEGREE "SAFE SURF' I TREATED SEAWATER - 50 BBLS OF 100 DEGREE SEAWATER _ Printed 5/14/2012 11:14:20AM North America - ALASKA - BP ip Page 16 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 1Z3-001 LM-E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) + (ft) 23:00 23:30 0.50 CASING P DECOMP SHUT IN OA AND BLOW DOWN LINES TO TANK - CHECK FOR PRESSURES, DRILL PIPE = 0 I PSI, KILL LINE = 0 PSI, OA = 0 PSI OPEN BAG AND BLOW DOWN TOP DRIVE 1- MONITOR WELL FOR 30 MINUTES = STATIC 23:30 - 00:00 0.50 CASING P DECOMP M/U TOP DRIVE - CBU5BPM =514 PSI - MINIMAL DIESEL AND CRUDE AT BOTTOMS UP 3/29/2012 00:00 - 01:30 1.50 CASING P DECOMP , SPCC CHECKS, GOOD CHANGE OUT MONITOR WELL FOR 30 MINUTES = STATIC OIL AND CRUDE ON TOP - CBU 1X, 4 BPM = 410 PSI - SEAWATER COMING BACK CLEAN - MONITOR WELL FOR 10 MINUTES = STATIC - BLOW DOWN TOP DRIVE 01:30 - 02:30 1.00 CASING P DECOMP MOVE DRILL PIPE IN DERRICK TO ALLOW FOR LARGE CASING TONGS ON RIG FLOOR - POOH FROM 1130' MD TO DRILL COLLARS - MONITOR WELL FOR 10 MINUTES 02:30 - 05:00 2.50 CASING P DECOMP LAY DOWN DRILL COLLARS - UD BOTH 43/4" DRILL COLLARS AND 6 1/4" DRILL COLLARS UD CASING CUTTER - GOOD WEAR PATTERN INDICATION ON CASING CUTTER KNIVES -OA =0 PSI, OOA= O PSI, 000A= 0 PSI, AT 05:00 HRS 05:00 - 06:30 1.50 CASING P DECOMP PULL WEAR RING -PUMP OUT BOP STACK. 06:30 - 08:30 2.00 CASING P DECOMP PJSM, M/U SPEAR BHA #7 - 103/4" SPEAR ASSEMBLY WITH 08:30 - 18:00 9.50 CASING P DECOMP SPEAR INTO 10 3/4" CSG AT WELL HEAD. -MAX PULL IS 200 K, WITH NO PIPE MOVEMENT. HELD CONFERENCE CALL WITH TOWN ENGINEERS AND CT / RWO TL ON PLAN FORWARD. -HEAT WELL HEAD AND VIBRATE PIPE WHILE ATTEMPTING TO PULL SLIPS FREE WITH -100,000 # OVER PULL -200 K UP WEIGHT. - AT 17:25 FIRS, 2 GAL GLYCOL FROM RADIATOR HOSE ON CH2MHILL VAC TRUCK SPILLED OUT OF CONTAINMENT ONTO PAD - SPILL REPORTED TO "5700 ", ADW HSE ADVISOR, CTD /RWO SUPERINTENDENT, AND CH2MHILL DISPATCH - SRT ARRIVED FOR INSPECTION AND INSTRUCTED CLEAN UP - SPILL WAS CLEANED UP, BAGGED, AREA WAS FLAGGED OFF, AND WILL BE RE- INSPECTED TOMORROW 18:00 - 19:00 1.00 CASING P DECOMP . PJSM, RELEASE SPEAR - DISENGAGE AND LAY DOWN SPEAR ASSEMBLY. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 16 of 69. Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 20:30 1.50 CASING P DECOMP PJSM, MI/l1 A 1/4" CUTTFR BHA #A - MOBILIZE 8 1/4" MULTI - STRING CUTTER TO RIG FLOOR M/U CUTTER, 8 1/2" STABILIZER, 3) 6 1/4" 1 DRILL COLLARS - RIH TO 422' MD - PUWT = 50K, SOWT = 52K 20:30 - 21:30 1.00 FISH P DECOMP LOCATE CUTTER AT 450' MD - LOCATE CASING COLLARS AT 416' AND 458' MD POSITION KNIVES AT 450' !, - CUT 10 3/4 CASING, 60 RPM = 800# TQ, - PUMP PRESSURE FROM 4.5 BPM = 390 PSI TO7 BPM =670 PSI - SEE PRESSURE DROP AND VERIFY CUT WITH BLADES = GOOD ! _ - CASING DROPPED APPROX 18" 1 21:30 - 22:30 1 1.00 CASING P DECOMP i CBU 1X, 3 BPM = 110 PSI - MONITOR WELL 20 MINUTES = STATIC - BLOW DOWN TO P DRIVE 22:30 - 00:00 1.50 CASING P DECOMP POOH FROM 450' MD - UD 6 1/4" DRILL COLLARS UD 8 1/4" MULTI - STRING CUTTER I- GOOD WEAR PATTERN ON BLADES 3/30/2012 00:00 - 00:30 0.50 CASING P DECOMP CLEAN / CLEAR RIG FLOOR - SERVICE RIG 01:30 1.00 - MOBILIZE BHA TO RIG FLOOR 00:30 - CASING P DECOMP PJSM, M/U SPEAR BHA #9 - RIH AND SPEAR 103/4" CASING AT THE WELL HEAD - R/U STEAM ON WELL HEAD AT E -SLIP AREA 01:30 - 03:00 j 1.50 CASING P DECOMP ATTEMPT TO PULL CASING - FMC REP ON HAND TO ENSURE ALL LOCK DOWNS OUT AND READY - CLOSED ANNULAR AND BACKED PRESSURE OFF TO 100 PSI - PULL MAXIMUM ALLOWED AT 165K = 100K OVER STRING WT - LEAVE STEAM ON WELL HEAD - WORK PULL AND SLACK OFF TO 165K ATTEMPT TO SHAKE PIPE WITH TUGGER j ' I - LEAVE UP WT ON FOR —15 MINUTE PERIODS - UNSUCCESSFUL, NO MOVEMENT 03:00 - 03:30 0.50 CASING P DECOMP DISENGAGE AND PULL SPEAR TO RIG FLOOR - UD SPEAR - MONITOR WELL = STATIC 03:30 - 06:00 2.50 CASING P DECOMP PJSM, R/U TO TEST BOPE - M/U TEST JOINT AND TEST PLUG AND RIH - R/U TEST CHART 06:00 10:00 4.00 CASING P DECOMP COMPLETE HAZARD RECOGNITION WORK SHEET ON NEW BOPE TEST PROCEDURE - SUBMIT TO DOYON DRILLING SUPERINTENDENT FOR APPROVAL 10:00 - 11:00 1.00 r CASING P DECOMP FMC WELL HEAD REP INSPECT 'C' WELL HEAD SPOOL FOR FURTHER OPTIONS. Printed 5/14/2012 11:14:20AM ID North America - ALASKA - BP Page 17 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 16:30 5.50 CASING P DECOMP TEST BOP 250/3500PSI FOR 5 MIN EACH CHARTED. - TESTED ANNULAR AND LOWER VBR'S WITH 4" TESTJOINT AND UPPER RAMS WITH 10 -3/4" TEST JOINT. - STATES RIGHT TO WITNESS WAIVED BY AOGCC REP JOHN CRISP.TEST WITNESSED BY DOYON TP TOM SHONES AND BP WSL DAVE RHODES. SEE ATTACHMENT_ 116:30 - 17:30 1.00 CASING P DECOMP FILL GAS BUSTER = 6 BBLS. -RIG DOWN TEST EQUIPMENT,BLOW DOWN SURFACE LINES. I 1 -WSL BLAIR NEUFELD RELIEVED NIGHT WSL FOR GLOBAL WELL CONTROL AUDIT OF NIGHT WSL, WES JEARDOE 17:30 - 18:30 1.00 CASING P DECOMP CONDUCT HAZARD RECOGNITION WORK SHEET FOR SURFACE JARRING -PJSM ON PU BHA. 18:30 - 21:00 2.50 CASING P DECOMP PICK UP 103/4 SPEAR AND PACK -OFF AS PER BAKER REP -RIH AND ENGAGE 10 3/4 CASING AT WELL HEAD -PULL UP JARS HIT AND HIT (1X) @ 95K - PULLED FREE, 65K UP WT. 21:00 - 22:30 1.50 CASING P DECOMP MONITOR WELL 10 MINUTES = STATIC - PREPARE TO SPLIT BOP TO REMOVE EMERGENCY SLIPS -- 2 BARRIERS IN PLACE INCLUDE CEMENTED 95/8" UNPERFORATED CASING j AND TESTED CIBP AT 2529' MD 22:30 - 23:00 0.50 CASING P DECOMP PJSM WITH FMC REP ON SPLITTING BOP AND REMOVING SLIPS 23:00 - 00:00 1.00 CASING P DECOMP REMOVE TURNBUCKLES,AIRBOOTS, AND BOLTS ON BOTTOM SPOOL. 3/31/2012 00:00 - 01:00 1.00 CASING P DECOMP PJSM WITH FMC ABOUT REMOVING THE 10 -3/4" SLIPS. NIPPLE DOWN THE BOPE AND REMOVE THE SLIPS AS PER FMC REP. 01:00 - 02:30 1.50 CASING P DECOMP PJSM, NIPPLE UP THE 135/8" BOPE. -FILL STACK NO LEAKS. 1 02:30 - 04:00 1.50 CASING P I DECOMP PJSM, PULL FISH TO FLOOR. -65K PUW. -UD DP PUP, XO, 6 1/4 BOWEN INTENSIFIFIRE JAR AND (1) DC. 04:00 - 04:30 0.50 CASING P DECOMP P/U CSG TOOLS TO RIG FLOOR. -CSG DOUBLE STACKS POWER TONG, AND HANDLING EQUIPMENT. 04:30 - 06:00 1.50 CASING P DECOMP PJSM, BREAK OUT CUT JOINT WITH SPEAR AND UD -M /U FLOOR VALVES AND CROSSOVERS -UD CUT JOINT AND SPEAR, CUT JOINT = 19.97' — Printed 5/14/2012 11:14:20AM I i North America - ALASKA - BP ' ; Page 18 61 69 Operation Summary Report . Common Well Name: PR331213 ■ AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3 -001 LM -E: (3,000,000.00 ) ■ Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 ©48.40ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT !, NPT Depth Phase Description of Operations (hr) ' (ft) 06:00 - 07:30 1.50 CASING 1 P DECOMP PULL AND UD 10 3/4" 55# CSG -TOTAL OF 9 FULL JTS AND (2) CUT JTS (19.97' AND 34.94') 1 1 -(3) SPRING / BOW TYPE CENTRALIZER. 1 -IN GOOD CONDITION. 1 1 1 I - --450' OF CSG RECOVERED. ■ -NO GAINS NO LOSSES. -WIPE OIL FROM O.D. 1 I -I.D. CLEAN. 07:30 - 08:30 1.00 CASING P DECOMP CLEAN RIG FLOOR OF ARCTIC -PAC ' -TEST 10 3/4 FLANGE BREAK TO 250 PSI _ LOW, 500 PSI HIGH, 5 MINUTES, CHARTED ' 08:30 - 09:00 0.50 CASING P ; DECOMP I P/U SPEAR ASSEMBLY FROM PIPE SHED. _ I -BREAK OUT OF CSGAND UD. _ 09:00 - 11:30 I 2.50 CASING P DECOMP ' M/U 10 3/4" SPEAR BHA #11 -P/U DRILL COLLARS FROM PIPE SHED -RIH TO 451" MD. ■ 11:30 - 12:00 0.50 CASING P DECOMP ENGAGE SPEAR AT 451' MD. 1 - PUW =60K -DOW = 67 K I -PULLED CSG —4 FT UP HOLE, ALL STOPPED. -JAR UP A FEW TIMES WITH 108 K OVER 1 I PULL. I -STOP JARRING AT 447 ' MD. CALL TOWN RWO ENGINEER / RWO SUPERINTENDENT. WILL START JARRING UP j i. 12:00 - 13:00 1.00 CASING ' P DECOMP ! PERFORM PRE - JARRING DERRICK & TOP 1 ' DRIVE INSPECTION. -OOA = 10 PSI, 000A =10 PSI, BELIEVE THERMAL EXPANSION. -PJSM HAZARD WORK SHEET REVIEWEL. 13:00 - 15:30 2.50 ; CASING P DECOMP I JAR ON STUCK 103/4" CSG AT 450' MD. PER BAKER REP. -STAGE UP FROM 200 - 225 - 250 WITH MAX I PULL OF 275 K. ! -PIPE STOPPED MOVING AT 444' MD. 1 -PERFORM DERRICK / TOP DRIVE , INSPECTION. - MONITOR WELL 10 MINUTES - STATIC DISCUSSED OPTIONS WITH RWO ENGINEER. I RELEASE FROM FISH AT 444' MD. 15:30 - 17:00 1.50 CASING 1 P DECOMP POH FROM444' MD -STAND 4" DP AND DRILL COLLARS IN ' DERRICK. I -UD 10 3/4" SPEAR ASSEMBLY. _ 17:00 - 17:30 0.50 CASING P 1 DECOMP CLEAN / CLEAR RIG FLOOR - CLEAN ARCTIC PAK OFF BHA 1 _I - MOBILIZE CUTTER BHA TO RIG FLOOR 117:30 - 19:00 1.50 CASING 1 P DECOMP i PJSM, M/U BHA #12 1 , I- INSTALL WEAR BUSHING 1 I - M/U 8 1/4" MULTI - STRING CUTTER 19:00 - 20:00 1.00 CASING P ' DECOMP PERFORM POST JARRING DERRICK I -- INSPECTION Printed 5/14/2012 11:14:20AM • North America - ALASKA - BP 40 Page"19 of 89 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To T Hrs Task Code NPT NPT Depth Phase Description of Operations L (hr) (ft) 20:00 - 23:00 3.00 FISH P DECOMP RIH AND CUT CASING - M/U 6 1/4" DRILL COLLARS AND DP - RIH TO 800' - PUWT = 65K, SOWT= 72K, 4 BPM = 280 PSI - PICK UP 3' AND CUT AT 822' MD - TORQUE WHILE CUTTING WAS ERRATIC, FROM 250 LBS/TQ TO 3000 LBS/TQ, - VERIFY CUT = GOOD NOTE: SEE INCREASE IN OOA AND 000A PRESSURES, OOA = 145 PSI, 000A = 125 PSI NOTIFY TOWN ENGINEER, DECIDE TO TEST 13 3/8 TO CHECK FOR COMMUNICATION TO I THE OOA'S - WILL TEST TO 250 LOW AND 500 HIGH WHEN OUT OF HOLE WITH CUTTER 23:00 - 00:00 1.00 CASING P DECOMP RE ADJUST RISER IN STACK - DRAIN STACK AND LET OUT AIR BOOTS - REPOSITION / LOWER RISER TO ORIGINAL 1 SPOT THAT HAD MOVED UP WHEN PULLING CASING 4/1/2012 00:00 - 00:30 0.50 CASING P 1 DECOMP (SERVICE RIG AND PERFORM SPCC WALK _ 'THROUGH 00:30 - 02:00 1.50 CASING P DECOMP POOH WITH CUTTER FROM 822' MD - STAND BACK COLLARS - UD CASING CUTTER, GOOD WEAR PATTERN ON CUTTER BLADES 02:00 - 03:00 1.00 CASING P DECOMP R/U TO TEST PERFORM CASING COMMUNICATION 1- WHEN OUT OF HOLE OOA AND 000A PRESSURES RETURNED TO 10 PSI AND "0" PSI RESPECTIVELY - CLOSE BLIND RAMS TEST 133/8 TO CHECK FOR i COMMUNICATION TO 00A AND 000A - TESTED FOR CASING COMMUNICATION, 250 PSI LOW, 500 PSI HIGH, 5 MINUTES, CHARTED - TEST WAS GOOD, THERE WAS NO PRESSURE INCREASE IN THE OOA AND 000A -R/D TEST EQUIPMENT 03:00 - 04:30 1.50 CASING P DECOMP M/U SPEAR BHA #13 - P/U COLLARS AND JARS - RIH TO414'MD 04:30 - 05:00 0.50 CASING P DECOMP PERFORM PRE JARRING DERRICK INSPECTION 05:00 - 05:30 ! 0.50 CASING P DECOMP HOLD RIG EVACUATION DRILL AND AAR - DISCUSSED ROUTES OF EGRESS FROM RIG FLOOR - 3RD PARTY CONTRACTOR CH2MHILL VAC TRUCK DRIVERS PARTICIPATED IN DRILL AND AAR 05:30 - 06:00 0.50 CASING P DECOMP ENGAGE FISH AT 444' MD - PULL FREE 90' 1 - 20K TO 90K OVERPULL DURING FIRST 90' - STAND BACK (1) STAND Printed 5/14/2012 11:14:20AM • North America - ALASKA - BP 4. Page 20 of 69 Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) j Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (ft) 06:00 - 07:30 1.50 CASING P DECOMP PJSM, DISPLACE WELL WITH, 8.5 PPG SEAWATER - 290 BBLS AT 9 BPM / 300 PSI. - 110 DEG IN AND 75 DEG OUT. - MONITOR WELL FOR 10 MINUTES STATIC. - OOA = 10 PSI, 000A = 0 PSI. 07:30 - 08:30 1.00 CASING P DECOMP POH FROM 354' MD WITH FISHED 10 3/4" CASING. - RACK DP AND DRILL COLLARS IN DERRICK. - RELEASE SPEAR ASSEMBLY FROM CASING. - M/U FOSV. 08:30 - 10:30 2.00 CASING P DECOMP PJSM, UD 10 3/4" CUT OFF JOINT (7.89'). - RECOVERED 8 FULL JOINTS. - TOP CUT OFF JOINT (7.89'). - 8 GOOD JOINTS UD. - BOTTOM CUT OFF JOINT (39.11') - RECOVERED 2 BOW TYPE CENTRALIZER. - RECOVERED 2 MORE CENTRALIZER WITH PIECES MISSING. - LOST IN HOLE: 5 BOW SPRINGS AND (1) I LOWER RING - THAT THE BOW SPRING WERE WELDED TO. 10:30 - 11:00 0.50 CASING P DECOMP ! CLEAN AND CLEAR RIG FLOOR - DRAIN BOP STACK - NO FISH VISIBLE IN STACK. 1- 11:00 - 12:00 1.00 CASING P DECOMP M/U 103/4" SPEAR ASSEMBLY BHA #14 - M/U JARS AND DRILL COLLARS - RIH W /DPTO 753' MD. - PUW = 70 K. SOW = 65 K. 12:00 - 14:00 2.00 CASING P DECOMP PJSM, SLIP AND CUT DRILLING LINE - INSPECT DRAW WORKS - TOOLS MAINTAINED AND PICKED UP AFTER JOB WAS COMPLETE - OOA= 0 PSI, 000A =0PSI 14:00 - 15:00 1.00 CASING P DECOMP CLEAN / CLEAR RIG FLOOR - CONDUCT RIG WIDE SAFETY SWEEP AND HOUSEKEEPING AUDIT 15:00 - 17:00 2.00 CASING P DECOMP CONDUCT SAFETY MEETING WITH RIG HANDS AND BP PERSONAL - PRESENT WERE: MARK PATERSON, STEVE 1 ROSSBERG, GREG MATTSON, GREG SARBER ∎AND RIG WSL- DAVE RHODES Printed 5/14/2012 11:14:20AM North America • ALASKA -BP Page 21 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code ; NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 22:00 5.00 CASING N HMAN DECOMP SAFETY STAND DOWN PERMIT PROCESS FOR "MAN RIDER" WAS I IN PLACE AND BEING USED EFFECTIVELY I- REVIEW OF MAN RIDER OPERATION REVEALED A GAP IN THE DOYON 16 "SOP" PROCEDURES - COMPETENCY LEVEL OF MAN RIDER OPERATOR WAS ALSO ADDRESSED - DDI TOOLPUSHERS, CHECK 6 REP, AND DRILLING SUPERINTENDENT WORKED WITH WSLAND BP PERSONAL TO FILL THESE GAPS - SAFETY HARNESSES WERE ALSO INSPECTED RESULTS: - REVISIONS WERE MADE TO DOYON "SOP" AND WERE APPLIED SPECIFICALLY TO DOYON 16 AND ITS EQUIPMENT - REVISIONS WERE SENT TO, AND !APPROVED BY, DDI DRILLING I SUPERINTENDENT KNOWLEDGE SKILLS AND ABILITIES, "KSA" 1- WILL BE REVIEWED BY DDI AND UP -DATED TO INCLUDE MAN RIDER COMPETENCY - 3 HARNESSES WERE FOUND TO BE OUT OF COMPLIANCE AND TAKEN OUT OF SERVICE AND OFF THE RIG - NEW HARNESSES WERE PLACED INTO SERVICE - RETURN TO WORK WAS APPROVED BY BP OPERATIONS MANAGER 22:00 - 22:30 0.50 CASING P i DECOMP PJSM, SPEAR AND JARRING - P/U 1 STAND AND M/U TOP DRIVE - PUWT = 65K, SOWT = 72K - TAG FISH AT 822' MD - STAB 103/4" CASING AND ENGAGE SPEAR — — GRAPPLE 22:30 - 00:00 1.50 CASING P DECOMP BEGIN JARRING - JAR AT 75K OVERPULL, PULL TO 200K OVERPULL - PERFORM DERRICK INSPECTIONS PER DDI POLICY 4/2/2012 00:00 - 05:00 - 5.00 CASING P DECOMP , CONTINUE JARRING OPERATIONS -JAR AT --190KOVER - STRAIGHT PULL, 200K TO 250K OVERPULLS - JARRED FISH UP HOLE FROM 822' TO 809'MD - PERFORM DERRICK INSPECTION EVERY 5 JAR HITS PER DDI POLICY - JAR 2 1/2 HOURS, —78 HITS, MADE 13' - SUSPEND JARRING OPERATIONS 05:00 - 06:00 1.00 CASING P DECOMP CONFER WITH TOWN RWO ENGINEER - DISCUSSED PLAN FORWARD FOR MAKING ADDITIONAL CUT - RECEIVED APPROVAL FROM RWO TO POOH AND RIH WITH CUTTER I- MONITORED WELL 10 MIN = STATIC. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Pa 22 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM j Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task % Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 06:30 0.50 CASING P DECOMP RELEASE SPEAR FROM CSG AT -809' MD. - MONITOR WELL FOR 10 MIN. STATIC. 06:30 - 07:30 1.00 CASING P j 1 DECOMP POH WITH SPEAR FROM 809' MD. -BRA KE OUT AND UD SPEAR ASSEMBLY. 07:30 08:00 0.50 CASING P 1 1 1 DECOMP 1P/U 5 1/2" CASING CUTTER BHA TO FLOOR + I -STRAP AND TALLY BHA. 08:00 - 09:00 1.00 CASING P , 1 DECOMP M/U 5 1/2" CUTTER ASSEMBLY TO CUT 103/4" CASING BHA #15 1 -P /U 43/4" DRILL COLLARS FROM PIPE SHED -RIH WITH 6 1/4" DRILL COLLARS 09:00 - 09:30 0.50 CASING P DECOMP 1 POH WITH DRILL COLLARS I 1 1 - STAND BACK IN DERRICK 09:30 - 10:00 0.50 CASING i P DECOMP I INSTALL 12.25" ID LONG WEAR RING. 10:00 - 11:30 1.50 CASING P ! DECOMP P h --- TO 890' WITH CSG CUTTER - OBTAIN PARAMETERS I PUW =70 K, SOW =75K 1 _ -RIH TO 975' MD. 11:30 - 14:00 2.50 ! CASING P DECOMP SAFETY MEETING WITH BP 1 - BP VP'S BERNARD LOONIE, RICHARD LYNCH, STEVE ROSSBERG, GREG SARBER, 1 RIG 16 WSL, TOOLPUSHER AND CREW 14:00 - 15:30 1.50 FISH P DECOMP LOCATE COLLAR AT 976' MD I I - CUT 103/4" CASING AT 974' MD I 1 - 60 RPM = 1 -2K TORQUE - VERIFY CUT = GOOD - MONITOR WELL 10 MIN = STATIC - BLOW DOWN TOP DRIVE 15:30 - 16:30 1.00 � CASING P DECOMP [ POOH FROM 974' MD MONITOR WELL 10 MINUTES = STATIC ■ 1 , - STAND BACK 6 1/4 COLLARS 16:30 - 18:00 1.50 CASING i P DECOMP POOH AND UD 4 3/4 DRILL COLLARS 8 00 50 C S IN G - UD CUTTER - PULL WEAR RING - CLEAR RIG FLOOR 18:00 - 19:30 1.50 1 CASING P DECOMP I M/U SPEAR AND PACK -OFF BHA #16 1 1- RIH WITH JARS, 6 1/4 DRILL COLLARS, AND _ I I ACCELERATOR 19:30 - 20:30 1.00 CASING i P , DECOMP RIH FROM BHA AND DP TO 809' MD ■ - PUWT = 65K, SOWT = 71K - ENGAGE FISH AT 809' 20:30 - 22:30 1 2.00 CASING P DECOMP M/U TOP DRIVE 1 1 - SPR'S 2 BPM = 30 PSI, 3 BPM = 40 PSI 1 I - CIRCULATE WELL WITH 90 DEGREE I SEAWATER, - 5 BPM = 70 PSI - PUMP "STEEL LUBE" PILL AND SPOT IN 10 ■ 3/4 X 133/8" CASING 22:30 - 23:00 0.50 CASING P 1 DECOMP PJSM ON JARRING ----- -_._4- - BLOW DOWN TOP DRIVE_ 23:00 - 00:00 1 1.00 I CASING P DECOMP BEGIN JARRING AT 809' MD r - MAXIMUM PULL AFTER JARRING = 275K, WHICH IS -200K OVERPULL PER "RWO" ENGINEER ■ - JAR FISH OUT OF HOLE FROM 809' TO 792' — MD Printed 5/14/2012 11:14:20AM North "Ametica - A ASKA • BP " page 23 of 69 Operation Summar R Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3-001 LM-E: (3,000,000.00 ) i I Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 j Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/3/2012 00:00 - 02:30 2.50 CASING P DECOMP PJSM, CONTINUE JARRING - JAR 103/4 CASING, SPEAR DEPTH = 792', CASING CUT DEPTH = 974', - MAXIMUM PULL AFTER JARRING = 275K, WHICH IS -200K OVERPULL PER "RWO" ENGINEER 1- PULLING HARD FROM 50K TO 200K j I OVERPULLS UNTIL -300' FROM -300 TO SURFACE, PULLED HARD I F ROM 50K TO 150K OVERPULLS - JAR THROUGH EACH COLLAR AREA (EVERY 40 FEET) - MONITOR WELL 10 MINUTES - STATIC i I -OOA =0 PSI, 000A = 0 PSI 02:30 - 03:30 1.00 CASING P DECOMP STAND BACK COLLARS - STILL 50K TO 150K OVERPULLS _ - PULL SPEAR TO RIG FLOOR 03:30 - 05:30 2.00 CASING P DECOMP PJSM ON LAYING DOWN SPEAR AND CASING SPEAR IS JAMMED INTO CASING, UNABLE TO RELEASE FROM CASING CASING AND SPEAR IS TOO LONG TO LAY DOWN TOGETHER - CALL FMC FOR WACHS CUTTER - M/U FLOOR VALVE TO 10 3/4 ", CIRCULATE OVER TOP OF HOLE - R/U POWER TONGS 05:30 - 06:00 0.50 CASING P DECOMP WAIT ON FMC WACHS CUTTER TO ARRIVE 06:00 - 07:00 1.00 CASING P DECOMP PJSM: EXACUTE "HAZARD RRECOGNITION I WORKSHEET" 1-DISCUSSED WELL CONTROL. PLAN TO DROP CSG IF NEEDED. -(2) FMC WELLHEAD REPS ARRIVED AND THE SAFE WORK PLAN WAS DISCUSSED. T07:00 - 09:30 2.50 CASING P DECOMP "HAZARD RECOGNITION WORKSHEET" SUBMITTED TO DOYON DRILLING SUPERINTENDENT FOR APPROVAL TO PROCEED. -FMC REP ATTACHED WACHS CUTTER TO FISH (CSG) 09:30 - 10:30 1.00 CASING P DECOMP FMC REP PERFORM THE CUT - 10 FT FROM THE COLLAR. -LOST IN HOLE 2 CENTRALIZER BANDS AND (8) BOW SPRING. 10:30 - 11:00 0.50 CASING P DECOMP UD CUT 10 3/4" JOINT 38.42 AND THE TOP FISH 3 FT. -SPEAR STUCK IN FISH SENT BACK TO BAKER. Printed 5/14/2012 11:14:20AM North America - ALASKA - RP Page 24 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3- 001LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM ' Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) — 11:00 - 12:00 1.00 CASING P DECOMP CLEAN RIG FLOOR 1 -DRAIN BOP STACK -OBSERVED LOST CENTRALIZER PIECES IN STACK. -WAIT ON BAKER FISHING TOOLS TO FISH INSIDE OF BOP STACK. - OBSERVED THE LOWER HALF WITH SOME BOW SPRING LOOKING UP, -ONE AT THE ANNULAR AND ONE AT THE I CSG SPOOL. - BREAK DOWN SAFETY VALVE FROM 10 3/4" I CSG TO 6 1/4" DC. -BOTH OOA AND 000A = '0' PSI 12:00 - 12:30 ! 0.50 CASING P DECOMP PERFORM PRE -TOUR CHECKS. -DRIVE INSPECTION - SERVICE RIG FLOOR EQUIPMENT. -BOTH OOA AND OOOA ='0' PSI 12:30 - 14:00 1.50 CASING P DECOMP CLEAN OUT 4 JOINTS OF 10 3/4" CSG IN PIPE SHED. -WAIT ON BAKER STRING MAGNETS AND ROPE SPEAR. 14:00 - 16:30 2.50 CASING P DECOMP IM/U ROPE SPEAR / MAGNET BHA j- RECOVERED PIECES OF BOW SPRING AND 2 BANDS. -LOST IN HOLE 7 BOW SPRINGS. -M /U BOP STACK RINSE TOOL. 16:30 - 17:30 1.00 CASING N WAIT DECOMP PJSM, REMOVE DERRICK STABBING BOARD MOTOR -FOR SHIPMENT TO DOYON RIG 14, -FOR UP COMING CASING JOB. 17:30 - 19:00 1.50 CASING P DECOMP FLUSH BOP STACK -WITH BOP STACK RINSE TOOL -AND BAKER STRING MAGNETS. - RECOVERED 2 CENTRALIZER BANDS. 19:00 - 20:00 1.00 CASING P DECOMP PJSM FOR MAKING UP FISHING BHA # 17 - DISCUSS CONTINGENCY PLAN FOR WELL CONTROL FOR NON SHEARABLES ACROSS BOPE. - REVIEW SOP FOR HANDLING BHA. - DISCUSS AND REVIEW DERRICK INSPECTION SOP. -REVIW MAN RIDER SOP. 20:00 - 22:00 2.00 CASING P DECOMP ! M/U 103/4" SPEAR ASSEMBLY - BULLNOSE, 9.9" SPEAR, SPEAR EXTENSION, SPEAR STOP SUB, BUMPER SUB, OIL JAR, XO, 9- 6 1/4" DC, XO, BOWEN INTESIFIRE, XO 1 JT AND 6 STANDS 4 1/2" DP 22:00 - 22:15 0.25 CASING P DECOMP M/U TOP DRIVE. -P /U WT 69K, S/O WT 75K. -SPEAR INTO TOP OF 10 3/4" CSG AT 974'. - TAGGED WITH BULL NOSE @ 976'. -SET 20K DOWN, NO GO - P /U, WORKED BACK DOWN 25K, BROKE FREE. -SET DOWN AND TAG STOP, PULL 35K OVER ENGAGING FISH. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 25 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. 1 UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 22:15 - 22:45 0.50 CASING P DECOMP PJSM ON JARRING, DISCUSS POTENTIAL HAZARDS PERFORM PRE - JARRING DERRICK INSPECTION. 000A= 0 PSI, 00A= 0 PSI. 22:45 - 00:00 1.25 CASING P ED COMP START JARRING ON FISH AT 150K PULLING ■ 200K AFTER JARS FIRED, - MOVING FISH UPHOLE 2 1/2 FT. -HUNG UP, WORKED UP TO 250K JARRING, -WITH OVER PULLS AFTER JARS FIRED TO 275K, 206K OVER STRING WT. -AFTER 10 HITS WITH JARS MADE 4 1/2 FT. - PERFORM DERRICK INSPECTION AFTER EVERY 10 JAR HITS. - CONTINUE JARRING TOTAL OF 25 HITS MOVING FISH UPHOLE TO 967 FT. 4/4/2012 00:00 - 00:30 0.50 CASING P DECOMP CREW CHANGE. -PJSM ON JARRIING -SERVE RIG, COMPLETE DERRICK ' INSPECTION. 00:30 - 01:30 1.00 CASING P t DECOMP ;CONTINUE JARRING FISH UPHOLE FROM 967 !FT. - FIRING JARS AT 265K. - PULLING 275K AFTER JARS FIRING SLOWLY WORKING UP HOLE. 01:30 - 05:00 3.50 CASING P DECOMP WORK COLLAPSE LOOSE FROM 1096 FT. -P /U DRAGGING FROM 120K TO 225K JARRING PAST 133/8" COLLARS ALL THE WAY OUT. CONTINUE WITH DERRICK INSPECTIONS EVERY 5 -10 JAR HITS. 05:00 - 05:30 0.50 CASING P DECOMP 'MONITOR WELL FOR 15 MIN. @ 453' - DISCUSS WELL CONTROL FOR DRILL COLLARS AND 10 3/4 CASING 05:30 - 06:00 0.50 CASING P DECOMP PULL OUT OF HOLE WITH ONE STAND AND ONE SINGLE OF 6 1/4 DRILL COLLARS -FISH WAS PULLING TIGHT AT 70K- 100K OVER PULL. 06:00 - 07:00 1.00 CASING P DECOMP H2S ALARM SOUNDED, FROM SHALE SHAKER SENSOR. - VERIFIED IT WAS FALSE ALARM. - WITH NON - SHEARABLES ACROSS THE BOP, UD 1 DRILL COLLAR - SECURE WELL WITH SAFETY VALVE. - CONDUCT AAR: - RECOGNIZE FAILURE TO COMPLY CORRECTLY TO DOCUMENTED PROCEDURES CONCERNING H2S ALARM. - EVALUATE TIME IT TOOK TO SECURE WELL DUE TO PULLING COLLAPSED CASING. - ELECTRICIAN CALIBRATED H2S SENSORS 07:00 - 07:30 0.50 CASING P DECOMP BRAKE OUT AND LAY DOWN 4" DP SAFETY JOINT TO PIPE SHED. -PICK UP ONE 6 1/4" DRILL COLLAR FROM SHED. -POOH FROM 235' TO 94' 07:30 - 09:00 1.50 CASING P ' DECOMP WAIT ON HAZARD RECOGNITION WORKSHEET APPROVAL FROM DDI DRILLING SUP. -NON SHEARABLE ACROSS THE BOP. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP ;Patti 28 of ss Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) j Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) I Site: EX PR331213 Rig Name /No.: DOYON 16 I Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 09:30 0.50 CASING P DECOMP BREAK OUT SPEAR FROM CASING -RIG UP CASING TONGS AND SAFETY VALVE - CHANGE ELEVATORS TO PULL 103/4 ICASING 09:30 - 10:00 0.50 CASING P DECOMP PJSM TO PULL AND LAY DOWN 10 3/4 CASING -TOP CUT= 1.60' -UD 1 JOINT PULLED UP 22' ON THE SECOND JT, CASING STOPPED MOVING. - PULLED UP TO 200K CASING STILL NOT MOVING. -STOPPED TO DISCUSS OPTIONS ,10:00 - 11:00 1.00 CASING P DECOMP DISCUSSED OPTIONS WITH RWO ENGINEERS, JAMES WILLINGHAM, RWO SUPERINTENDENT. 11:00 - 11:30 { 0.50 CASING P DECOMP PULL ON CASING TO 225K MAX PULL, NO MOVEMENT. 11:30 - 12:00 0.50 CASING P DECOMP i PJSM, DISCUSSED RIGHT HAND TORQUE IN PIPE DURING FISHING. 12:00 - 13:30 1.50 CASING P DECOMP WAIT ON HAZARD RECOGNITION WORKSHEET APPROVAL FROM DDI DRILLING SUP. -PULL DRAGGING PIPE WITH RIGH HAND TORQUE IN 103/4" CSG, STUCK AT THE WELL HEAD 13:30 - 15:00 1.50 CASING P DECOMP PJSM, APPLY 15K RIGHT HAND TORQUE TO 10 3/4" CASING WITH RIG TONGS MAKINGING 1/8 TURN. -PULL ON CASING TO 225K. - CASING PULLED FREE. -UD 2 FULL JOINTS OF CASING AND 10 FT CUT JT. - RECOVER BOTH BANDS OF BOW SPRING CENTRALIZER. (LOST 7 BOW SPRING) 15:00 - 17:15 2.25 CASING P DECOMP j M/U BAKER ROPE SPEAR MAGNET. - RECOVER 1/2 BOW SPRING FROM BOP STACK. -LD ROPE SPEAR MAGNET. 17:15 - 19:00 1.75 CASING P DECOMP PJSM, R/U AND BLOW DOWN CHOKE LINE. -FLUSH STACK. -BLOW DOWN TOP DRIVE. - PERFORM A PULL TEST ON TEST PLUG WITH BAKER MAGNET BEFORE INSTALLING TEST PLUG. 19:00 - 19:30 0.50 BOPSUR P DECOMP PJSM FOR BOP RAM INSPECTION WITH WSL, TOOLPUSHER AND CREW. - REVIEW SOP FOR INSTALLING TEST PLUG, BOP RAM AND ANNULAR INSPECTION. - DISCUSS ACCUMULATOR BLEED DOWN. LOCKOUT TAGOUT PROCEDURES. - DISCUSS ALL PROCEDURES IN DETAIL FOR RAM INSPECTION. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Pace 27 of 69, Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 19:30 - 00:00 4.50 BOPSUR P DECOMP 2 BARRIERS IN PLACE INCLUDE CEMENTED 9 5/8" UNPERFORATED CASING AND TESTED, CIBP AT 2529' MD HR/U AND INSTALL BOP TEST PLUG. - FUNCTION AND INSPECT ANNULAR ELEMENT. -OPEN AND INSPECT ALL RAMS AND RAM CAVITIES. - RECOVER 2 MORE BOW SPRING PIECES FROM CENTRALIZER FOUND IN BOP RAM CAVITY. -000A= 0 PSI, OOA = 0 PSI 4/5/2012 00:00 - 00:30 0.50 BOPSUR P DECOMP ;CREW CHANGE. PJSM FOR BOP RAM INSPECTION WITH WSL, TOOLPUSHER AND CREW. - REVIEW SOP FOR INSTALLING AND REMOVING TEST PLUG, BOP RAM AND ANNULAR INSPECTION. - DISCUSS ACCUMULATOR BLEED DOWN. LOCKOUT TAGOUT PROCEDURES. - DISCUSS ALL PROCEDURES IN DETAIL FOR !RAM INSPECTION. 00:30 - 03:00 2.50 BOPSUR P j DECOMP 2 BARRIERS IN PLACE INCLUDE CEMENTED 9 5/8" UNPERFORATED CASING AND TESTED CIBP AT 2529' MD - CONTINUE AND INSPECT ALL RAMS AND RAM CAVITIES. -ALL RAMS CHECK OK. -CLOSE AND M/U BOP RAM DOORS. 03:00 - 05:15 2.25 BOPSUR P ! DECOMP PJSM, REVIEW SOP FOR TESTING BOPE. -M /U TEST JT. -FILL STACK WITH WATER. -LOWER PIPE RAM DOOR SEAL LEAKING -CIO DOOR SEAL 05:15 - 05:30 0.25 BOPSUR P DECOMP START WEEKLY BOPE TEST. p -TEST BOPE TO 250/3500 PSI. FOR 5 MIN t° 1 EACH. -1J- -CHART RECORD TESTS. - HYDRULIC LEAK: UPPER DOUBLE GATE RAM, OFF DRILLER SIDE, DOOR (BOTTOM) RING SEAL LEAKING. SUSPEND BOPE TESTING - STATES RIGHT OF WITNESS WAIVED BY AOGCC REP LOU GRIMALDI. 05:30 - 07:00 1.50 BOPSUR N RREP DECOMP OUTER SEAL RING FAILED, NOT THE '0' RING -ON UPPER DOUBLE GATE RAM, OFF DRILLER SIDE, DOOR (BOTTOM) HING SEAL j ASSEMBLY. I- REPAIRED AND TESTED BY RIG MECHANIC. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP a-2e cf 0s... Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) ' Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth ; Phase ! Description of Operations (hr) (ft) I 07:00 - 09:00 2.00 BOPSUR N WAIT DECOMP H2S ALARM SOUNDED AT RIG SENSOR # 2 & # 3. -ALL PERSONAL EVACUATED. -ALL LEVEL '0' NOTIFICATION MADE. -ALL PERSONAL COUNTED FOR. -THE ESD WAS NOT ACTIVATED. - 07:28 HRS PBU SECURITY ARRIVED TO CONFIRM THE STATUS OF THE EVENT. - DRILLER CALLED ALL CLEAR AFTER SWEEP IOF RIG WITH H2S MONITOR. AAR: - ANNULUS VALVE LEFT OPEN, NOT SAFE TO RE -ENTER CELLAR BOX AREA. -NEED A COPY OF DOYON 'RE -ENTRY TO RIG' PROCEDURE IN THE " GO BAG" AT MUSTER AREA. 09:00 - 13:00 4.00 BOPSUR P DECOMP DEFEATED SAFETY CRITICAL EQUIPMENT. SIERRA MONITORING SYSTEM -H2S ALARM SYSTEM I- ATTENDENT REQUIRED WITH A PORTABLE LEL MONITOR -WHILE ANNULAS VALVE IS OPEN DURING BOPE TEST. ! ! -DDI ELECTRICIAN TROUBLE SHOOT AND I i I REPAIR LEL ALARM SYSTEM. !REPLACE CONTROL BOARD, SHALE SHAKER 1 LEL HEAD, CALIBRATE AND TEST ENTIRE GAS MONITOR SYSTEM. TEST BOPE. 13:00 - 15:00 2.00 BOPSUR ! P DECOMP RIG TEAM LEADSHIP MEETING. -BP COIL / RWO SUP. AND WSL -DDI DRILLING SUP AND TOOLPUSHER 15:00 - 17:00 2.00 BOPSUR P DECOMP ! CONTINUE WITH BOPE TEST. -TESTING BOP COMPONENTS TO 250/3500 PSI5 MIN EACH. - TESTED ANNULAR AND LOWER 3 112 X 6 VBR WITH 4" TEST JOINT, -TEST UPPER 103/4" WITH 103/4" TEST JT. ! -TEST CHOKE MANIFOLD, FLOOR SAFETY I VALVES, BLIND SHEAR RAM, HCR, KILL VALVES. IBOP, -UPPER AND LOWER VALVES ON TOP DRIVE. - PERFORM ACCUMULATOR DRAW DOWN TEST. -2 F/P ITEMS NOTED ON AOGCC TEST FORM- H2S AND METHANE GAS DETECTORS. - CALIBRATE AND TEST LEL ALARMS. -CHART RECORD ALL TESTS. 17:00 - 18:00 1.00 BOPSUR P DECOMP BLOW DOWN ALL SURFACE LINES. -R/D BOP TEST EQUIPMENT. - INSTALL LONG WEAR RING. RUN IN 4 LDS. - -1/4 CUP PER/HRS DRIP FROM THE WELL DURING BOP TESTING. - DISCUSSED WITH RWO ODE, RWO SUPERINTENDENT (THERMAL EXPANSION). -KWF = SEAWATER 8.6 PPG. -OOA= 10 PSI. 000A= 10 PSI. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 29 of 69 Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3-001 LM-E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:00 1.00 CASING P DECOMP CLEAR AND CLEAN RIG FLOOR.. - INSTALL [BOP ROLLER BEARINGS ON TOP DRIVE. 19:00 - 20:00 1.00 CASING P DECOMP PJSM FOR BHA. - M/U BHA # 18, 4 13/16" SWAGE, 5.5" MSC, XO, XO, 9- 6 1/4" DCS, XO, XO 20:00 - 21:30 1.50 CASING P DECOMP RIH WITH 5.5 CUTTER BHA. P/U WT 70K, S/O WT 75K TAG AT 1165 FT. SETTING DOWN 20K. ' ODE. 21:30 - 21:40 0.17 CASING P DECOMP MONITOR WELL - STATIC. 21:40 - 22:30 0.83 CASING P DECOMP 1 POH WITH BHA # 18. LSET BACK 10 STANDS DP. 22:30 - 23:30 1.00 CASING P DECOMP STAND BACK BHA, INSPECT BHA. -2 CUTTERS AND PINS BENT. - MONITOR WELL- STATIC. 23:30 - 00:00 0.50 CASING P DECOMP CLEAR RIG FLOOR, P/U TOOLS. HOUSE KEEPING. -RE -DRESS 5.5 CUTTER. 4/6/2012 100:00 - 00:15 0.25 CASING P DECOMP CREW CHANGE. DISCUSS ONGOING OPS. 1-CHECK RIG EQUIPMENT. -PJSM FOR HANDLING BHA 00:15 - 00:45 0.50 CASING P DECOMP M/U BHA # 19- 5 15/16" SWAGE, 5.5" MSC, XO, XO, 9- 61/4" DCS, XO, XO 00:45 - 01:30 0.75 CASING P DECOMP RIH WITH 10 STANDS DP. -P /U WT 70K. S/O WT 75K. 1 -TAG AT 1168', WITH A CUTTER DEPTH OF 1163' - STACKING 5K. 01:30 - 02:30 1.00 CASING P DECOMP NOTIFY ODE. - MONITOR WELL- STATIC. -POOH TO INSPECT BHA. -STAND BACK 10 STANDS DP. 02:30 - 03:00 0.50 CASING P DECOMP MONITOR WELL- STATIC. STAND BACK DC, UD 5.5" CUTTER BHA # 19 INSPECT CUTTER- BLADES INTACT. 03:00 - 03:30 0.50 CASING P DECOMP CLEAN RIG FLOOR -LOAD JARS AND 7" SWAGE 03:30 - 04:30 1.00 CASING P DECOMP PJSM, M/U BHA # 20 -7" SWAGE, XO, 2 BUMPER SUBS, SLB DRLG JAR, XO, 9- 6 1/4" DC, XO, INTENSIFIRE, XO. 04:30 - 06:00 1.50 CASING P j DECOMP PU 7 " SWAGE & JARRING ASSEMBLY. -RIH TO 1109' MD - PUW =70 K, SOW =75 K. 06:00 - 08:00 2.00 CASING P DECOMP RIH WITH 7" SWAGE TO 1109' MD. - UNABLE TO CIRCULATE, PRESSURE UP TO 1500 PSI. -SURGE PIPE TO ESTABLISH CIRCULATION. j -6 BPM/ 100 PSI. -WASH DOWN FROM 1109' TO 1583' MD WITH -5 -6 BPM / 80 -100 PSI. -NO OBSTRUCTION NOTED. -PUMP OFF, RIH FROM 1583' TO 2511' MD, -SET 10 K DOWN. -P /U TO 2496' MD, NO DRAG. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Pam 30 of 6 J . Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 08:00 - 09:30 1.50 CASING P j (ft) DECOMP CBU FROM 2496' MD -5 BPM / 130 PSI. - PUMPED 115 DEG. HEATED SEAWATER 8.5 PPG. -OBSERVED TRACES OF KIMPAC. OBSERVED WELL FOR 10 MINUTES. STATIC. 09:30 - 12:00 2.50 CASING P DECOMP POH FROM 2496' MD WITH 7" SWAGE BHA I #20. -NO OVER PULL NOTED. -CLEAN KENPAK OFF BHA. -LOOKS LIKE WET TAR. 12:00 - 12:30 0.50 CASING P DECOMP CLEAR AND CLEAN RIG FLOOR. -CLEAN TOOLS. 12:30 - 13:00 0.50 CASING P DECOMP PJSM. M/U CUTTER BHA # 21. -5 15/16" SWAGE, 5.5 MSC, XO, XO, 9 6 V4" !DC, XO,XO. 13:00 - 14:00 1.00 CASING P DECOMP RIH WITH 12 STDS AND SINGLE DP. } 14:00 - 14:30 0.50 FISH P DECOMP PUMP AND ROTATE .6 BPM 1100 PSI. AT 60 RPM. - P /U =74K. S /O= 80K. ROT WT= 73K. - LOCATE COLLARS AT 1435 FT AND 1477 FT. -P /U TO 1475 FT. i- CUT 10 3/4" CASING AT 1475 FT MD. 60 RPM = 2.5K TORQUE. 1- VERIFY CUT = GOOD. -- 14:30 - 16:00 1.50 CASING P DECOMP CBU 6.5 BPM 240 PSI. MONITOR WELL- STATIC. 16:00 - 18:00 2.00 CASING P DECOMP HOLD PJSM WITH NEW RIG CREW ON TOUR WITH WSL, TP, RWO FIELD SUPERINTENDANT. -FIRST DAY BACK WITH NEW RIG CREW. I - REVIEW PAST OPS ON CURRENT WELL. - FISHING AND JARRING OPERATIONS. - INCLUDING HSE, WELL CONTROL AND ICE PAD CONCERNS. 18:00 - 19:00 1.00 CASING P DECOMP CHECK ANNULAS PRESSURES. 1- OOA/000A= 0 PSI. -PJSM. R/D HARDLINES ON UPPER ANNULAS. 19:00 - 20:15 1.25 CASING P DECOMP I PJSM, BLOW DOWN TOP DRIVE. -POH WITH 12 STANDS DP. 20:15 - 20:30 0.25 CASING P DECOMP PJSM, REVIEW PROCEDURE FOR HANDLING BHA. - MONITOR WELL FOR 10 MINUTES. STATIC. 20:30 - 21:00 0.50 CASING P DECOMP PULL FIRST STAND OF DRILL COLLARS. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 31 of 69 Operation Summary Report • Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task ! Code NPT ! NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 21:15 0.25 CASING N WAIT DECOMP H2S ALARM AT SHALE SHAKER SOUNDED AT 2100 HRS. -NON ESSENTIAL PERSONNEL EVACUATED RIG TO MUSTER AREA. - LOADER OPERATOR SECURED PAD ENTRANCE. - DRILLER AND LEAD FLOORHAND DONNED SCBA. - LOWERED BHA BACK TO FLOOR LEVEL. -SET SLIPS, M/U DC CLAMP. BREAK OFF LIFT SUB. -M /U FLOOR SAFETY VALVE. AND CLOSED. -LOW AIR ALARM SOUNDED ON SCBA - DRILLER AND LEAD FLOORHAND EVACUATED AT NEAREST EGRESS TO MUSTER AREA. - 100 PERCENT HEAD COUNT VERIFIED AT MUSTER AREA. -LEVEL 0 NOTIFICATIONS WERE MADE ALONG WITH PAD OPERATOR. -TOOL PUSHER NOTIFIED DDI SUPERINTENDANT AND HSE. 21:15 - 22:30 1.25 CASING N WAIT DECOMP CONDUCT AAR WITH ALL PERSONNEL ON LOCATION. - DISCUSS WITH CREW PROPER EGRESS I DURING EVACUATION. -THE TIME IT TOOK TO BREAK OUT LIFT SUB 1AND MIU ON SAFETY VALVE COULD HAVE BEEN MITIGATED BY HAVING 4 1/2" IF THREADS ON DRILL COLLAR LIFT SUB INSTEAD OF TAKING TIME TO BREAK OUT OF DC. - GOOD JOB BY ALL EVACUATING RIG. - CONTINUE TO ADD H2S SCAVENGER TO CIRCULATING SYSTEM. KEEP INVENTORY OF SAME. - REVIEW SOP FOR RIG RE -ENTRY AFTER H2S EVACUATION. 22:30 - 23:00 0.50 CASING N WAIT DECOMP TOOL PUSHER AND DRILLER DONNED SCBA. -USING HANDHELD GAS DETECTOR, PERFORMED SWEEP OF RIG 1- BEGINNING IN CELLAR THROUGH PITS 'WORKING THEIR WAY TO -NO H2S DETECTED ON SWEEP. FLOOR. -RESET RIG ALARMS. - ANNOUNCED ALL CLEAR . 23:00 - 00:00 1.00 CASING N WAIT DECOMP RIG ELECTRICIAN CHECKED RIG GAS ALARM SYSTEM- CHECKED OK. 1-RECORD SHOW 28 % SPICKE H2S. -WAIT ON 2 FULL SCBA AIR PACKS TO ARRIVE TO KEEP IN COMPLIANCE BEFORE RETURNING TO NORMAL OPERATIONS. - MONITOR WELL 4/7/2012 00:00 - 02:00 2.00 1 CASING N WAIT ! DECOMP , WAIT ON 2 FULL SCBA AIR PACKS TO ARRIVE BEFORE RESUMING OPERATIONS TO KEEP IN COMPLIANCE BEFORE RETURNING TO NORMAL OPERATIONS. - MONITOR WELL _ 02:00 - 02:15 0.25 CASING P DECOMP MONITOR WELL- STATIC. PJSM, REVIEW SOP FOR HANDLING BHA. Printed 5/14/2012 11:14:20AM Page 32 of 69 11, North America ALASKA BP � P a Operation Summary Report Common Well Name: PR331213 1AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:15 - 03:00 0.75 CASING P DECOMP POH AND SET BACK DRILL COLLARS. UD 5.5 CUTTER BHA # 21 CIO CUTTER BLADES AN D PINS. 03:00 - 04:30 1.50 CASING P DECOMP M/U BHA # 22 -BULL NOSE, 9.9" SPEAR, SPEAR EXTENSION, STOP SUB, BUMPER SUB, BOWEN JAR, XO, 9- 6 1/4" DC, XO, INTENSIFIRE, XO. 04:30 - 05:00 0.50 CASING P DECOMP RIH WITH 9 STDS DRILL PIPE. P/U WT 70 K, S/O WT 75K. ENGAGE FISH AT 1130 FT. 1 05:00 - 05:30 0.50 1 CASING P DECOMP CBU + 800 STROKES - SLIGHT DIESEL / OIL SMELL AT THE SHAKER ;FROM KENPAC. (FREEZE PROTECT) - BYPASS SHAKERS AND DUMP 67 BBLS OF RETURNS (15 % KENPAC) -WSL AND PIT WATCHER NOTED: NO H2S SMELL. -THE FLUID CLEANED UP AND WAS RETURNED TO THE ACTIVE PIT SYSTEM. -800 STROKES PAST BOTTOMS -UP THE H2S ALARM SOUNDED. 05:30 - 06:30 1.00 j CASING N WAIT ! DECOMP 1 H2S ALARM AT SHALE SHAKER SOUNDED AT 0535 HRS. -NON ESSENTIAL PERSONNEL EVACUATED RIG TO MUSTER AREA. - LOADER OPERATOR SECURED PAD ENTRANCE. - TOOLPUSHER AND LEAD FLOORHAND DONNED SCBA. -TURN PUMP OFF, SECURE WELL (ANNULAR I ; &TOP DRIVE IBOP) - DRILLER AND LEAD FLOORHAND EVACUATED AT NEAREST EGRESS TO , MUSTER AREA. -100 PERCENT HEAD COUNT VERIFIED AT MUSTER AREA. -LEVEL '0' NOTIFICATIONS WERE MADE 1ALONG WITH PAD OPERATOR. -TOOL PUSHER NOTIFIED DDI SUPERINTENDANT AND HSE. - REVIEW DOYON SOP FOR RIG RE -ENTRY AFTER H2S EVACUATION. -TOOLPUSHER & MOTORMAN SWEEP THE RIG WITH 000 H2S READING. AAR: -RIG CREW DISCUSSED HOW THE EVACUATION OF THE RIG FOLLOWED SOP CORRECTLY. -DISCUSSED THE ROLES AND RESPONSIBILITIES OF THE DRILLER AND LEAD FLOORHAND WHILE SECURING THE WELL. - DISCUSSED THE ROLES AND RESPONSIBILTIES OF LOADER OPERATOR DURING EVACUATION. • Printed 5/14/2012 11:14:20AM North America - ALASKA - BP > Page 33 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) , Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:00 0.50 CASING -I N WAIT DECOMP ALL CLEAR GIVEN BY TOOLPUSHER -AFTER COMPLETING SWEEP OF RIG. -WSL VERIFY '0' PSI ON SHUT -IN WELL. -BREAK OUT TOP DRIVE AND INSTALL FOSV, WELL SHUT IN. -BLOW DOWN TOP DRIVE. 07:00 - 08:30 1.50 CASING N ' WAIT DECOMP RIG ELECTRION RECALIBRATED H2S MONITORING SYSTEM. 1-AND TRUBLE SHOOT SYSTEM. RECORD SHOW 28 % SPICKE. -DDI CHANGED OUT SCBA PACKS. - REMOVED 290 BBLS (8.5 PPG SEAWATER) KWF FROM PITS -TAKE ON 290 BBLS NEW KWF. 08:30 - 09:00 0.50 CASING N HMAN DECOMP 08:40 HRS. PIT WATCHER REPORTED LEAK FROM VAC TRUCK. - REPORTED TO 5700, RWO SUPERINTENDANT, ADW HSE ADVISER, PAD OPERATOR. -FRED WITH ERT ALASKA CLEAN SEAS ARRIVED TO INSPECT THE EFFECTED AREA @11:35 HRS. - 2 CUPS SEAWATER WITH 3% DIESEL (KENPAK) FROM A HOSE BEING STOWED AFTER USE. 09:00 - 15:00 6.00 CASING N WAIT DECOMP RIG ELECTIRICIAN RE- CALIBRATED H2S MONITORING SYSTEM. -AND TROUBLE SHOOT SYSTEM. -RIG LEADERSHIP MEETING ON PLAN FORWARD. -RWO SUPERINTENDANT, WSL, AWD HSE ADVISER, DDI FIELD SUPERINTENDANT, - TOOLPUSHER, DOYON SAFETY REP. 10:00 HRS CREW REPORTED 4% CO READING FROM THE CELLAR BOX. - RELOCATE PORTABLE HEATER TRUNK. - INSTRUCTED CREW TO NOTIFY WSL OF CHANGE. 15:00 - 16:00 1.00 CASING N WAIT DECOMP RIG LEADERSHIP DISCUSSED BACK TO WORK PLAN. - ANNULUAS PRESSURES WERE TAKEN. -OOA & 000A = '0' PSI. 1 -ONE WIND SOCK WAS REPOSITIONED. 1 16:00 - 16:30 0.50 CASING P DECOMP PERFORM PRE - JARRING DERRICK INSPECTION. 16:30 - 17:00 0.50 CASING P DECOMP WSL AND DRILLER VERIFY '0' PRESSURE ON WELL AND DRILL PIPE. -OPEN ANNULAR. -CBU + —1100 STK OVER. -3 BPM / 60 PSI, 7 BPM 140 PSI. - MONITOR WELL STATIC FOR 10 MINUTES. 17:00 - 18:20 1.33 CASING N WAIT DECOMP POH WITH 1 STAND DRILL PIPE. NOTICE LIGHT FLICKER ON H2S STROBE. STOP AND CHECK H2S MONITOR. CHECK OK. - CONTINUE TO PULL STAND DRILL PIPE. - NOTICE LIGHT FLICKER ON H2S STROBE 2ND TIME. -STOP AND CHECK H2S MONITOR AGAIN. - 18:20 H2S ALARM AT SHALE SHAKER SOUNDED. - Printed 5/14/2012 11:14:20AM Nora America - ALASKA - BP Page 34 of 6 9 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) ; Start Date: 3/19/2012 End Date: 4/27/2012 IZ3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (ft) _ 18:20 - 18:30 0.17 CASING N WAIT j DECOMP -NON ESSENTIAL PERSONNEL EVACUATED RIG TO MUSTER AREA. -100 PERCENT HEAD COUNT VERIFIED AT MUSTER AREA. - LOADER OPERATOR SECURED PAD ENTRANCE. - DRILLER AND LEAD FLOORHAND DONNED SCBA. - LOWERED AND SPACED TOOL JT AT RIG FLOOR. - M/U FLOOR SAFETY VALVE. AND CLOSED. -CLOSE ANNULAR SECURING WELL. - DRILLER AND LEAD FLOORHAND EVACUATED AT NEAREST EGRESS TO ' MUSTER AREA. ' -LEVEL 0 NOTIFICATIONS WERE MADE ALONG WITH PAD OPERATOR. -TOOL PUSHER NOTIFIED DDI SUPERINTENDANT AND HSE. 18:30 - 19:00 0.50 CASING N WAIT DECOMP REVIEW SOP FOR RIG RE -ENTRY AFTER H2S I EVACUATION. 1 -TOOL PUSHER AND DRILLER DONNED SCBA. -USING HANDHELD GAS DETECTOR, PERFORMED SWEEP OF RIG - BEGINNING IN CELLAR THROUGH PITS WORKING THEIR WAY TO RIG FLOOR. -NO I-12S DETECTED ON SWEEP. -RESET RIG ALARMS. -ANNOUNCED ALL CLEAR BY DRILLER AT 1900 HRS. 19:00 - 19:30 0.50 CASING N WAIT DECOMP CONDUCT AAR- - DISCUSSED WITH RE -ENTRY PERSONNEL THAT IF DURING THE SWEEP OF THE RIG, ITHE HAND HELD GAS MONITOR SHOWS READINGS ABOVE PERMISSIBLE LEVELS, THEN THE RE -ENTRY PERSONNEL ARE TO EXIT THE RIG IMMEDIATELY AND RETURN TO THE MUSTER AREA FOR FURTHER INSTRUCTIONS. -RIG CREW DISCUSSED THE FACT THAT THEIR ANNUAL TRAINING AT DOYON OFFICE ' IN TOWN WITH SCBA'S - THEY ARE TRAINED 1 WITH DIFFERENT SCBA'S THEN ARE PROVIDED ON THE RIG. Printed 5/14/2012 11:14:20AM • North America - ALASKA - BP Page 35'069 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date I From - To Hrs Task Code ! NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 23:00 3.50 I CASING N WAIT DECOMP DDI SUPERINTENDANT ALONG WITH TWO RIG ELECTRICIANS TROUBLESHOOTING RIG ALARM SYSTEMS AND SENSORS. - UNABLE TO FIND ANY PROBLEMS WITH # 4 SENSOR AT SHALE SHAKER WHERE ALARM KEEPS OCCURRING. FOLLOW PLAN FORWARD FROM TOWN TEAM AND RWO FIELD SUPERINTENDANT. 1- ADDITIONAL I-12S SENSORS WERE INSTALLED NEXT TO SENSOR # 4 AT SHALE ■ SHAKER TO VERIFY IF THE ORIGINAL WAS I FAULTY. -IT WAS CONCLUDED THAT SINCE NONE OF THE SENSORS PLACED NEAR THE ORIGINAL WERE ACTIVATED, THAT THE ORIGINAL SENSOR WAS SUFFERING AN INTERMITTANT DETECTION FAILURE. -SINCE NO PROBLEMS COULD BE FOUND, THE SIERRA SYSTEM SENSOR # 4 SHALL BE BYPASSED. -ALL OTHER 112S AND GAS MONITOING STATIONS SHALL REMAIN IN OPERATION SINCE NONE HAVE CAUSED ANY FALSE ALARMS IN THE PAST THREE DAYS. -TO PROVIDE ADDITIONAL REDUNDANT H2S DETECTION, TWO PERSONAL MONITORS AND A HAND HELD MONITOR SHALL BE POSITIONED AT THE SHALE SHAKER NEXT TO SENSOR #4. -EVERY MEMBER OF THE RIG TEAM , INCLUDING THIRD PARTY PERSONNEL, WILL BE ASSIGNED PERSONAL H2S MONITORS TO BE WORN AT ALL TIMES WHILE WORKING ON THIS LOCATION. -WHILE MONITORING THE PITS, IF THE DESIGNATED PERSONNEL OBSERVES H2S FINDINGS ON ANY OF THE ABOVE STATED MONITORS, THEN IT WILL BE TREATED AS AN ACTUAL H2S RELEASE AND THE DRILLER WILL BE NOTIFIED. -IF THE H2S LEVEL ON ANY OF THESE MONITORS REACH 10 PPM, THE DRILLER WILL BE NOTIFIED AND HE WILL CALL FOR THE RIG TO BE EVACUATED FOLLOWING DDI STANDARD SOP FOR H2S EVACUATION. - NOTIFIED AOGCC REP BOB NOBLE OF PLAN FORWARD FROM TOWN TEAM. 23:00 - 23:50 0.83 CASING P DECOMP OPEN THE WELL TO RESUME OPERATIONS -NO PRESSURE OBSERVED. -OPEN CHOKE -OPEN ANNULAR. - MONITOR WELL FOR 10 MINUTES.STATIC. i II 23:50 - 00:00 0.17 CASING P DECOMP CREW CHANGE -PJSM - CONCERNING AFOREMENTIONED DEFEATED SAFETY DEVICES AND POSSIBLE CONTINUING JARRING. 4/8/2012 00:00 - 00:30 0.50 CASING P DECOMP CREW CHANGE. -PJSM CONCERNING DEFEATED SAFETY DEVICES AND POSSIBLE JARRING. - MONITOR WELL. STATIC. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 36 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ! (ft) 100:30 - 01:15 h 0.75 CASING P DECOMP POH WITH FISH FROM 1085'MD. -STAND BACK 8 STANDS DP. -WITH 75K OVERPULLS AT 1116', 35K AT 990', 45K AT 864' -832', 50K AT 801', 20K AT 674' - MONITOR WELL BEFORE DRILL COLLARS. STATIC. 1-SET BACK LAST STAND DP. 01:15 - 01:30 0.25 CASING P DECOMP 1 MONITOR WELL FOR 10 MINUTES. -PJSM FOR HANDLING FISHING BHA ANDUD 103/4" CASING. 01:30 - 02:30 1.00 CASING P DECOMP STAND BACK DRILL COLLARS. -OPEN JARS -R/U POWER TONGS. 02:30 - 05:00 2.50 CASING P Y DECOMP UD SPEAR AND TOP CUT 10 3/4" CASING. 1-CONTINUE TO UD 103/4" CASING 05:00 - 05:30 0.50 CASING P DECOMP DRAIN BOP STACK. .-CLEAN RIG FLOOR OF KENPAK. _ 05:30 - 07:00 1.50 CASING P j DECOMP M/U ROPE SPEAR WITH STRING MAGNETS. - OBSERVED BOTTOM 1/2 OF A CENTRALIZE AT THE WELL HEAD. -THE FISH BECAME SNAGGED AND FELL DOWN HOLE. - MAGNETS WERE CLEAN. l -UD FISHING TOOLS. -P /U BOP RINSE TOOL AND FLUSH BOP STACK. i -LOST IN WELL: 103/4" CENTRALIZER. ONE COMPLETE, 1/2 CENTRALIZER AND 5 BOW SPRING. - UNABLE TO M/U TOP DRIVE BLOW DOWN TOOL. ! j - INSPECT TOP DRIVE SAVER SUB. BAD. BOB NOBLE THE NORTH SLOPE AOGCC ' INSPECTOR, - CALLED AFTER DISCUSSING THE DEFEATED SENSOR #4 WITH LOU GRIMALDI. - BOB SAID CALL AND REPORT ANY CHANGE IN THE CURRENT STATUS. 07:00 - 08:00 1.00 CASING P DECOMP PJSM, P/U TOP 103/4" CUT JOINT WITH I SPEAR STUCK IN IT, FROM PIPE SHED. UNABLE TO DISENGAGE SPEAR FROM FISH. -UD SPEAR STUCK IN 10 3/4" CSG. - INSTALL LONG WEAR RING. -I.D. = 12.25" -RILDS = 4. 08:00 - 08:30 0.50 CASING , P DECOMP MONITOR WELL AND DRAIN BOP STACK. -CLOSE BLIND RAMS. 08:30 - 10:30 � 2.00 CASING P j DECOMP PJSM - CHANGE OUT TOP DRIVE SAVER SUB. 10:30 - 12:00 1.50 CASING P DECOMP PJSM -WSL / DRILLER CONFIRM NO PRESSURE UNDER BLIND RAMS. -OPEN BLIND RAMS. -WELL STATIC. -M /U BHA # 23, -5 15/16" SWAGE, 5.5 MSC, XO, XO, 9 6 V4" DC, XO,XO. 12:00 - 12:30 j 0.50 CASING P DECOMP SERVICE RIG. GREASE DRAWORKS. - PERFORM PRE -TOUR CHECKS. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP sage 3r of 69 Operation Summary Report Common Well Name: PR331213 I AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code T NPT NPT Depth Phase Description of Operations (hr) (ft) - 13:30 1.00 CASING P DECOMP !RIH BHA # 23, 5.5" CUTTER ASSEMBLY - 18 STANDS 4" DP FROM DERRICK. -TO —1990 FT MD. 13:30 - 16:00 2.50 FISH P DECOMP PUMP 3.5 BPM 400 PSI. LOCATE COLLARS AT 1928 FT AND 1968 FT. - P /U 2' TO 1966 FT MD. -CUT CASING, PUMPING 6 BPM 1000 PSI. 80 , RPM 2K TORQUE. -CONFIRM CUT -P /U 80K, S/O 86K. 16:00 - 17:00 1.00 CASING P DECOMP CBU PLUS 1000 STROKES OVER WITH 8.6 PPG SEAWATER. - PUMPING 6.5 BPM 330 PSI. - MONIOTOR WELL FOR 10 MINUTES- STATIC. 17:00 - 18:00 1.00 CASING P DECOMP SERVICE AND INSPECT TOP DRIVE. 18:00 - 19:30 1.50 CASING P ' DECOMP POH FROM 1964 FT MD I -STAND BACK 17 STDS OF DP. 19:30 - 20:30 1.00 CASING P DECOMP MONITOR WELL BEFORE PULLING BHA FOR 10 MINUTES- STATIC. -UD CUTTER BHA # 23. - 3/4 OF 1 CUTTER BLADE LEFT IN HOLE. - REMAINING 2 CUTTER BLADES BENT AND I HAVE CRACKS. - LOAD OUT CUTTER, SEND TO BAKER SHOP FOR INSPECTION. 20:30 - 21:00 0.50 CASING P DECOMP CLEAR RIG FLOOR. -DRAIN STACK. -PULL LONG WEAR RING. 121:00 - 23:30 2.50 CASING P DECOMP PJSM FOR P/U BHA # 24. - M/U BHA, BULL NOSE, SPEAR PACKOFF, 9.9" SPEAR, SPEAR EXTENSION, STOP SUB, BUMPER JAR, JAR, XO, 9 -6 1/4" DC, XO, INTENSIFIRE, XO, 1.4" SINGLE DP . 23:30 - 00:00 0.50 CASING P DECOMP RIH WITH BHA # 24 9.9" SPEAR -ON 4" DPDRILL PIPE. -TO 568 FT MD. -OOA AND 000A= 0 PSI. 4/9/2012 00:00 - 01:00 1.00 CASING 1 P DECOMP CREW CHANGE -PJSM ON RIH WITH 9.9" SPEAR. - CONTINUE TO RIH WITH 9.9" SPEAR 1 ASSEMBLY. BHA # 24- FROM 568' MD. TO 1475' MD. -P /U WT. = 80K. S/O WT. = 75K. - ESTABLISHED CIRCULATION AT 5 BPM WITH 100 PSI PUMP PRESSURE. - TAG UP ON 10 3/4" CSG 1475' MD. AND I SWALLOW 10' TO 1487' MD. 1 -SET DOWN 25 K TO WORK SPEAR INTO CSG. -PULL 60K OVER TO PULL CSG FREE WITH A 25K INCREASE IN STRING WEIGHT. 01:00 - 02:00 1.00 CASING P DECOMP CIRCULATE B/U 2 TIMES AT 6.5 BPM AT 170 PSI PUMP PRESSURE. I- RECIPROCATE PIPE. 02:00 - 02:15 0.25 CASING P DECOMP I MONITOR WELL FOR 10 MINUTES- STATIC. 02:15 - 02:20 0.08 CASING P DECOMP SET BACK ONE STAND DP. -BLOW DOWN TOP DRIVE. Printed 5/14/2012 11:14:20AM North America - ALASKA BP 1111 Page 38 of 69 Operation Summary Report m p rY p Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 !Z3 -001 LM -E: (3,000,000.00 ) I _.J Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:20 - 03:00 0.67 CASING P DECOMP POH WITH BHA # 24 SPEAR ASSEMBLY FROM 1475' MD. - 1440'- 95K OVERPULL,1425'- 75K,1450'- 45K, 1370'- 55K,1270'- 50K, -820'- 40K, 745'- 35K, AND 670'- 35K. 03:00 - 03:15 0.25 CASING P j DECOMP CONDUCT KICK WHILE TRIPPING DRILL. - PROMPT RESPONSE TIME BY RIG CREW. - MONITOR WELL BEFORE PULLING BHA FOR 10 MINUTES- STATIC. 03:15 - 06:00 2.75 CASING P DECOMP STAND BACK DRILL COLLARS. - LID CUT JT 1.90 FT, 10 3/4" CSG TO GATHER WITH SPEAR. -TO THE PIPE SHED. -LOST IN HOLE (7) BOW SPRINGS. 06:00 - 08:30 2.50 CASING P DECOMP CLEAR RIG FLOOR. -DRAIN STACK. -FISH 1/2 OF A CENTRALIZER FROM BOP STACK. -M /U BOP RINSE TOOL AND FLUSH STACK. _ -UD RINSE TOOL. 08:30 - 09:00 0.50 CASING P DECOMP INSTALL LONG WEAR RING. -I.D. = 12.25" 09:00 - 10:00 ; 1.00 CASING P DECOMP ! P/U SPEAR FROM PIPE SHED WITH THE SHORT CUT JT - TRAPPED ABOVE THE GRAPPLE - POWER WASH SPEAR ASSEMBLY -UD IN TO PIPE SHED AND RIG WELDER CUT FISH OFF. 10:00 - 11:00 1.00 CASING P DECOMP P/U 8.25" CUTTER ASSEMBLY -BAKER REP CHANGED BLADES. -BULL NOSE, 8 1/4" MSC, XO, XO, 9- 6 1/4" DC, XO, XO. 111:00 - 12:00 1.00 CASING P I DECOMP }2IH WITH 8.25" CSG CUTTER ASSEMBLY -ON 4" DP FROM DERRICK. -TO 2310' MD. - PUW = 85 K, SOW = 92 K, 2.5 BPM / 150 PSI. - LOCATE TOP COLLAR AT 2340' MD -STAND BACK ONE STAND. - INSTALL TIW FOR SAFETY STAND DOWN. - MONITOR WELL 12:00 - 14:00 2.00 CASING N WAIT DECOMP HSE SAFETY STAND DOWN FOR DDI RIG 15 INCIDENT. 14:00 - 18:00 4.00 CASING N WAIT DECOMP WAIT ON 8.5 PPG 120 DEG. SEAWATER DUE TO UNAVAILABLE TRUCKS. HELD UP AT BP INJECTION FACILITY. -PT HARDLINES TO FLOWBACK TANK 250/3500 PSI. 18:00 - 18:52 0.87 FISH P DECOMP WITH 22 STANDS DP IN HOLE - PUMP 3 BPM 260 PSI - LOCATE COLLAR AT 2381' MD. -CUT CASING, PUMP 4BPM 450 PSI 70 RPM. -ROT WT 85K, P/U WT 85K, S/O WT 91K. : TORQUE 2K, FINAL 4BP 500 PSI. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP • Page,3 0# , Operation Summary ,Report Common Well Name: PR331213 I AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) _ I Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To ( Hrs - Task j Code NPT NPT Depth Phase Description of Operations (hr) (ft) 118:52 - 19:30 0.63 CASING N WAIT DECOMP 18:52 RIG H2S ALARM SOUNDED FROM DRILLERS CONSOLE- SENSOR # 3 -NON ESSENTIAL PERSONNEL EVACUATED 1 RIG TO MUSTER AREA. -100 PERCENT HEAD COUNT VERIFIED AT MUSTER AREA. - LOADER OPERATOR SECURED PAD ENTRANCE. - DRILLER AND LEAD FLOORHAND DONNED SCBA. -CLOSE ANNULAR AND TOP DRIVE IBOP SECURING WELL. - DRILLER AND LEAD FLOORHAND I EVACUATED AT NEAREST EGRESS TO MUSTER AREA. -LEVEL 0 NOTIFICATIONS WERE MADE ALONG WITH PAD OPERATOR. -TOOL PUSHER NOTIFIED DDI ! SUPERINTENDANT AND HSE. - REVIEW SOP FOR RIG RE -ENTRY AFTER AN EVACUATION. 19:30 - 19:45 0.25 CASING N WAIT DECOMP THE DRILLER AND LEAD FLOOR HAND MADE A FULL SWEEP OF THE RIG USING HAND HELD H2S MONITOR ALONG WITH PERSONAL H2S BADGES. 19:45 - 20:10 0.42 CASING N WAIT DECOMP ALL CLEAR WAS GIVEN BY DRILLER, BUT ONLY THE TOOL PUSHER AND THE RIG ELECTRICIAN RE- ENTERED THE RIG AT THIS TIME. -THE ELECTRICIAN RECALIBRATED THE # 3 H2S SENSOR. -THE HISTORY ON THIS SENSOR SHOWED A SPIKE OF 56 PPM. i , I -ALL REMAINING PERSONNEL WERE 1 ! CLEARED TO RE -ENTER THE RIG. -- VERIFIED 0 PSI SHUT IN PRESSURE. 20:10 - 22:30 2.33 CASING P DECOMP CONDUCT AAR- -ALL PERSONNEL EVACUATED THE RIG USING THE PROPER EGRESS TO STAY UPWIND OF H2S. -BOTH CH2 DRIVERS ON LOCATION WERE ABLE TO HEAR THE EVACUATION CALLED OUT DUE TO THE FACT THAT THEY WERE MONITORING THE D-16 HUB. -THEY CORRECTLY SHUT DOWN IGNITION SOURCES AND EXITED THEIR VEHICLES TO THE MUSTER AREA. =THE WSL SUGGESTED TO RE -TEST AND OR RECALIBRATE H2S SENSOR # 3 AT THE DRILLERS CONSOLE. -THE REMAINING PERSONNEL WERE HELD AT THE MUSTER AREA UNTIL THIS WAS ACCOMPLISHED. I j -MUD PUMP WAS ROLLED EVERY 30 MINUTES TO PREVENT THE TOP DRIVE FROM FREEZE UP. -WAIT ON 1 SCBA AIR PACK TO ARRIVE TO REMAIN IN COMPLIANCE. Printed 5/14/2012 11:14:20AM N orth America.. ALASKA - BP . Page 0 of e9 . Operatio Summary Report -- . . Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) i Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) , Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date j From - To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (ft) 122:30 - 23:00 0.50 I CASING P DECOMP PJSM, DISCUSS PLAN FORWARD. -WITH 0 PSI SHUT IN PRESSURE. -LINE UP VA TO OPEN TOP FLOWBACK TANK I VIA TESTED HARDLINE. - ANNULAR CLOSED WITH 500 PSI CLOSING PRESSURE. 1- CIRCULATE DOWN DRILL PIPE WITH 8.5 PPG SEAWATER 4 BPM 400 PSI. ' -TAKE RETURNS FROM VA TO FLOWBACK l 1 i TANK. 1 I -NOT EXCEEDING 90 PSI ON HARDLINE TO FLOW BACK TANK. I - VERIFY CASING CUT. -PUMP 180 BBLS TO FLOWBACK TANK. 23:00 - 00:00 1.00 1 CASING I ■ DECOMP FREEZE PROTECT HARDLINE WITH DIESEL. - WAIT 2 HRS FOR ANY POTENTIAL GAS TO DISSIPATE [FROM FLOW BACK TANK BEFORE CLEANING j I OUT WITH VAC TRUCK. 4/10/2012 ' 00:00 - 02:00 2.00 CASING P DECOMP CONTINUE W/O OPEN TOP TANK TO SETTLE I 'OUT DISSIPATING ANY GAS ENTRAINED IN j ;FLUID. -PUMP DIESEL IN HARDLINE TO CONFIRM I ■ NOT FREEZING. -ROLL PUMPS EVERY 30 MINUTES TO KEEP TOP DRIVE FROM FREEZING. 02:00 - 03:00 1.00 I CASING P DECOMP SUCK OUT OPEN TOP FLOWBACK TANK I I WITH VAC TRUCK. j -50 BBLS REMAIN IN FLOW BACK TANK. -SEND DIRTY VAC TO OFFLOAD. -LOAD 200 BBLS 8.5 PPG SEA WATER INTO PITS. 03:00 - 04:00 1.00 CASING P � DECOMP OPEN VA 1 -PUMP DOWN DRILL PIPE 4.4 BPM 400 PSI. -PUMP 130 BBLS. ! 1 - TAKING RETURNS TO FLOWBACK TANK FROM VA j- MONITOR HARDLINE PRESSURE TO FBT I 1 NOT EXCEEDING 150 PSI. 04:00 - 12:00 8.00 CASING 1 P t DECOMP FREEZE PROTECT HARD LINE WITH DIESEL. - WAIT 2 HRS FOR ANY POTENTIAL GAS TO DISSIPATE FROM FLOW BACK TANK BEFORE CLEANING OUT WITH VAC TRUCK. -WAIT ON PAD III, TRUCKS LINED UP 1 BECAUSE G &I WAS DOWN A FEW DAYS. , 1 , TO PAD III BACK, NO OTHER TRUCKS 1 1 i AVAILABLE. -OOA & 000A = '0' PSI AT 0700 HRS. 12:00 - 15:00 3.00 CASING P 1 DECOMP PJSM. SUCK OUTY OPEN TOP TANK. - CIRC THRU TOP DRIVE EVERY 30 MINUTES. '- WORK ON H2S DETECTION SYSTEM. _ 1- WSL CHANGING OUT. Printed 5/14/2012 11:14:20AM North America - ALASKA BP Page 41 of 89 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task j Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 17:30 2.50 CASING P DECOMP PJSM ON CIRCULATING REMAINING 50 BBLS. - LINE UP AND CIRCULATE SEAWATER DOWN DP, TAKING RETURNS UP 10 3/4" CSG. !- ANNULAR PREVENTOR CLOSED, TAKING RETURNS THRU CHOKE TO OPEN TOP TANK. - PUMP 60 BBLS @ 5 BPM / 90 PSI. - SHUT DOWN, BLEED ALL PRESSURE. - PUMP VIA KILL LINE ACROSS THE STACK. - BLEED ALL PRESSURE, VACATE RIG FLOOR. - OPEN ANNULAR PREVENTOR, MONITOR WELL, WELL STATIC. 17:30 - 19:00 1.50 CASING P DECOMP POH WITH 8.25" CUTTER BHA 1 -STAND BACK DP - MONITOR WELL FOR 10 MINUTES BEFORE BHA. 19:00 - 20:00 1.00 CASING P i DECOMP PJSM FOR HANDLING BHA. -UD BHA # 25 - INSPECT AND RE -DRESS 8.25" CUTTER. - CUTTER BLADES WORN BUT INTACT. - MONITOR WELL. STATIC. 20:00 - 20:30 0.50 CASING P DECOMP CLEAR RIG FLOOR. -CLOSE BLIND RAMS. - ELECTRICIAN WORKING ON LEL ALARM SYSTEM. -RUN NEW SHIELDED CABLE FOR # 3 SENSOR AT DRILLERS CONSOLE. - CALIBRATE AND TEST THE SAME. 1-DIRTY VAC SUCK OUT REMAINING 50 BBLS IN FLOW BACK TANK. -0 PSI SHUT IN PRESSURE. - OPEN BLIND RAMS 20:30 - 22:45 2.25 CASING P DECOMP PJSM, RE -DRESS 10 3/4" SPEAR PACKOFF. -B /O 4 -LDS, PULL WEAR RING. 1-MU BHA # 26, BULL NOSE, PACKOFF, 1 j 1 9.9 "SPEAR, SPEAR EXTENSION, STOP SUB, I BUMPER SUB, JAR, XO, 9- 6 1/4" DC, XO, ! INTENSIFIRE, XO. 22:45 - 00:00 1.25 CASING P DECOMP RIH WITH BHA # 26 4/11/2012 00:00 - 00:30 0.50 CASING j P DECOMP RIH TO 1966' -M /U TOP DRIVE. -P /U 81K, S/O 87K -SLIDE DOWN 10' ENGAGE FISH -PULL 63K OVER PULL - -P /U ADDITIONAL 10' 00:30 - 01:05 0.58 CASING P DECOMP PJSM, CLOSE ANNULAR. -OPEN VA TO TAKE RETURNS TO FLOW BACK TANK. - ATTEMPT TO PUMP, PUMP PACKING OFF. -WORK PIPE AND WORK PUMP AT DIFFERENT PRESSURES UNTIL CIRCULATION ESTABLISHED. Printed 5/14/2012 11:14:20AM North Amerca - ALASKA - BP 111 .Page 42 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 , Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT , NPT Depth 1 Phase Description of Operations 1 (hr) (ft) 01:05 - 01:10 0.08 CASING N WAIT DECOMP H2S ALARM SOUNDED AT SENSOR # 1 IN ;CELLAR. ! -ALL NON ESSENTIAL PERSONNEL EVACUATED RIG. - DRILLER AND FLOOHAND DONNED SCBA AIR PACKS. - DRILLER AND LEAD FLOOR HAND CLOSED TOP DRIVE IBOP. ,- CLOSED VA VALVE- SECURING WELL. 1-ANNULAR WAS ALREADY CLOSED DUE TO 1 CIRCULATION TO FLOWBACK TANK. -SCS WAS ALERTED AND HE ANNOUNCED ON D-16 HUB TO EVACUATE RIG TO MUSTER AREA. -SCS ALERTED F -PAD OPERATOR OF H2S EVACUATION. - LOADER OPERATOR SECURED PAD ROAD ENTRANCE. 01:10 - 01:25 0.25 CASING N WAIT DECOMP ALL PERSONNEL REPORTED TO MUSTER 'AREA. 100 % HEAD COUNT ESTABLISHED BY 1 1 SCS. -'0" LEVEL NOTIFICATION ALONG WITH BPXA SECURITY AND HSE BEGAN BY WSL. - TOOLPUSHER MADE ALL DDI _ NOTIFICATIONS. 01:25 - 01:30 0.08 CASING N WAIT DECOMP REVIEW RIG RE -ENTRY SOP WITH ALL PERSONNEL AT MUSTER AREA. -NOTED THAT IF THE RIG SWEEP TEAM DETECTS H2S WITH HAND HELD MONITORS THEY ARE TO EVACUATE TO MUSTER AREA IMMEDIETELY. 01:30 - 01:40 0.17 CASING N WAIT 7 DECOMP DRILLER AND MOTORMAN DONNED SCBA'S AND PERFORMED SWEEP OF THE RIG. - DRILLER ANNOUNCED ALL CLEAR. 01:40 - 02:30 0.83 CASING N WAIT DECOMP BLOW DOWN HARD LINE TO FLOWBACK TANK. - GATHER FULL SCBA'S TO REPLACE DEPLETED ONES. 1 -ROLL PUMP EVERY 30 MINUTES TO KEEP STOP DRIVE FROM FREEZING. I- CONDUCT AAR ALL PERSONNEL EVACUTED RIG USING CORRECT EGRESS. - UPWIND TO MUSTER AREA. 02:30 - 03:30 1.00 CASING P DECOMP OPEN VA AND IBOP, WITH ANNULAR CLOSED. 0 PSI SHUT IN PRESSURE. - ESTABLISH CIRCULATION TAKING RETURNS TO FBT. - PUMPING 5 BPM AT 450 PSI WITH 90 PSI ON HARDLINE. -PUMP 165 BBLS. Printed 5/14/2012 11:14:20AM III North America - ALASKA - BP 43 of 69 Operation Summary Report • Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM I Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 03:40 0.17 CASING N WAIT DECOMP H2S ALARM SOUNDED AT SENSOR # 1 IN CELLAR. -ALL NON ESSENTIAL PERSONNEL EVACUATED RIG. - DRILLER AND FLOOHAND DONNED SCBA AIR PACKS. 1 j - DRILLER AND LEAD FLOOR HAND CLOSED TOP DRIVE IBOP. - CLOSED VA VALVE- SECURING WELL. - ANNULAR WAS ALREADY CLOSED DUE TO CIRCULATION TO FLOWBACK TANK. -SCS WAS ALERTED AND HE ANNOUNCED ON D-16 HUB TO EVACUATE RIG TO MUSTER AREA. -SCS ALERTED F -PAD OPERATOR OF I-12S EVACUATION. - LOADER OPERATOR SECURED PAD ROAD ENTRANCE. 03:40 - 04:00 0.33 CASING N WAIT DECOMP BALL PERSONNEL REPORTED TO MUSTER [AREA. 100 % HEAD COUNT ESTABLISHED BY j SCS. "0" LEVEL NOTIFICATION ALONG WITH BPXA SECURITY AND HSE BEGAN BY WSL. - TOOLPUSHER MADE ALL DDI NOTIFICATIONS. REVIEW RIG RE -ENTRY SOP WITH ALL PERSONNEL AT MUSTER AREA. -NOTED THAT IF THE RIG SWEEP TEAM 1 DETECTS I-12S WITH HAND HELD MONITORS THEY ARE TO EVACUATE TO MUSTER AREA IMMEDIETELY. 04:00 - 05:00 1.00 CASING N WAIT DECOMP BLOW DOWN HARD LINE TO FLOWBACK TANK. -ROLL PUMP EVERY 30 MINUTES TO KEEP TOP DRIVE FROM FREEZING. I - CONDUCT AAR -ALL PERSONNEL RESPONDED IN A TIMELY MANNER. -TRUCK DRIVER ON LOCATION SHUT DOWN TRUCK. - EXCELLENT RIG EVACUATION -RIG OPS SUSPENDED UNTIL FULL SCBA AIR PACKS ARRIVE TO KEEP IN COMPLIANCE. -WAIT ON ELECTRICIAN AND DDI SUPERINTENTANT TO ARRIVE TO INVESTIGATE ALARM ACTIVATIONS WITH NO I-12S / OR LEL PRESENT. 05:00 - 08:30 3.50 CASING N WAIT DECOMP RIG ELECTRICIAN AND DDI FIELD SUPERINTENDANT ON LOCATION. -TROUBLE SHOOT RIG H2S ALARM I ! I 1 ACTIVATION. Printed 5/14/2012 11:14:20AM 0, • North'America - ALASKA - BP # Pam 44 of 89 Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) 1 Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 1 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: - -- - - - - - - -- ----------- - -- - - -- -- - - - - - -- -- Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code ` NPT 1 NPT Depth I Phase 1 Description of Operations 108:30 - 10:00 1.50 CASING P (ft) 1 DECOMP PJSM. CIRCULATE OUT 195 BBLS TO OPEN TOP TANK 1 - CIRCULATE HEATED SEAWATER @ 4 BPM / ,125 PSI. i- PRESSURE FLUCTUATING DUE TO 1 , 1 INTERMITTENT PACKING OFF. , 1 1 - CIRCULATE WITH ANNULAR CLOSED, THRU 1 CHOKE TO OUTSIDE TANK. i 1 - PUMPED 195 BBLS TOTAL, BLEED ALL 1 I PRESSURE, OPEN ANNULAR, MONITOR i I 1 WELL. - WELL STABLE / 10 MINUTES. STAND BACK 1 I(1) STAND, BLOW DOWN TOP DRIVE. FREEZE PROTECT OUTSIDE LINE W/ 1 DIESEL. SECURE WELL. - CLOSE ANNULAR, INSTALL SURFACE SAFETY VALVE AND CLOSE. 10:00 - 17:30 7.50 CASING N RREP DECOMP RUN SHIELDED WIRE FOR GAS SENSORS. - INSTALL UPGRADED SENSORS @ RIG 1 FLOOR, SHAKER & CELLAR. '- FILL PITS WITH HEATED SEAWATER, EMPTY OUT OPEN TOP TANK. - CALIBRATE NEWLY INSTALLED GAS ■ 1 SENSORS_ 17:30 - 18:30 1.00 1 CASING P DECOMP ALARM SYSTEM TESTED AND IN PROPER !WORKING ORDER. i- NOTIFY AND RECIEVED APPROVAL FROM , RWO TEAM LEAD AND 1 FIELD SUPERINTENDANT TO RETURN TO _• WORK. 18:30 - 18:45 1 0.25 CASING P DECOMP PJSM WITH ALL PERSONNEL ON RIG 1 i CONCERNING RETURN TO WORK. 18:45 - 19:00 0.25 1 CASING P DECOMP I PREPARE TO OPEN WELL UP. -0 PSI SHUT IN PRESSURE ON WELL BORE. -OPEN CHOKE, CHECK FOR LEL OR H2S. NEGATIVE PRESENCE. -OPEN ANNULAR . 19:00 - 19:30 0.50 ' CASING P 1 DECOMP FLOW CHECK WELL FOR 10 MINUTES. 1 STATIC. -BLOW DOWN TOP DRIVE TO CONFIRM NO FREEZE UP. 1 -AOGCC WAIVED WITNESS TO UPCOMING ! BOPE TEST. 19:30 22:30 1 3.00 1 CASING P , DECOMP POH WITH BHA # 26 SPEAR/PACKOFF i 1 1 1 ASSEMBLY. - STAND BACK 4" DRILL PIPE. 22:30 - 22:40 0.17 CASING P DECOMP MONITOR WELL FOR 10 MINUTES. STATIC. 22:40 - 00:00 1.33 CASING P DECOMP , STAND BACK 9 DRILL COLLARS. � UD JARS, INTENSIFIER, XO'S, PACKOFF, _ 1 SPEAR ASSEMBLY. 4/12/2012 00:00 - 00:30 0.50 CASING 1 P i DECOMP MONITOR WELL FOR 10 MINUTES. STATIC. -PJSM FOR UD 10 3/4" CASING i -BREAK OUT AND UD 103/4" SPEAR. 100:30 - 03:00 2.50 CASING P 1 DECOMP 1 R/U POWER TONGS AND CSG HANDLING ' EQUIPMENT. -UD 103/4" CSG. RECOVERED 413' OF CSG. 1 -TOP CUT= 2 FT, 9 FULL JTS, BOTTOM CUT 139.10 FT 1 1 , -3 1/2 CENTRALIZERS RECOVERED. i -- I _ -1/2 CENTRALIZER LEFT IN HOLE. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP 1 Page 45 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 03:30 0.50 r CASING P DECOMP MONITOR WELL. STATIC -R/D CASING EQUIPMENT. -DRAIN STACK, CONFIRM NO CENTRALIZERS IN STACK -R/U AND JET STACK. 03:30 - 05:00 1.50 CASING P h FUNCTION TEST RAMS. INSTALL FMC TEST I PLUG. j — R/U TO TEST BOPE. 05:00 - 10:00 5.00 CASING P DECOMP PJSM WITH CREW ON TESTING BOPE. -TEST BOPE TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES EACH. -CHART ALL TESTS -AOGCC WAIVED WITNESS TO TEST. 10:00 - 12:00 2.00 CASING P DECOMP PJSM. C/O PIPE RAMS. - OPEN RAM DOORS. - REMOVE 10 3/4" PIPE RAMS AND INSTALL 9 5/8" PIPE RAMS. - CLOSE RAMS DOORS. 12:00 - 16:30 4.50 CASING P DECOMP CONTINUE W/ BOPE TEST. - MANUAL CHOKE NOT FUNCTIONING PROPERLY. NOT HOLDING PRESSURE AT ALL. INSPECT SAME. - GET REPLACEMENT PARTS FROM VALVE SHOP. 9 5/8" PIPE RAMS HOLD HIGH PRESSURE , NOT LOW PRESSURE. - ATTEMPT SEVERAL TIMES, N/G. PULL TEST JT. - FILE TONG MARKS OFF OF TEST JOINT. - RETEST, HIGH PRESSURE GOOD, LOW PRESSURE NO GOOD. 1 ,16:30 - 19:30 3.00 CASING P DECOMP PJSM. OPEN DOORS ON BOPE. � . - REMOVE 95/8" PIPE RAMS, REPLACE RAM RUBBERS. - WORK ON MANUAL CHOKE. - INSTALL NEW MANUAL CHOKE. -M /U RAM DOORS. 19:30 - 22:30 3.00 CASING P DECOMP FILL STACK -RE -TEST 9 5/8" PIPE RAMS TO 250/3500 PSI. -RE -TEST MANUAL CHOKE TO 250/3500 PSI. - TESTED BOP COMPONENTS- 250/3500 PSI. -TEST ANNULAR AND LOWER 3 1/2 X 6 VBR WITH 4" TEST JOINT, -TEST UPPER 95/8" WITH 9 5/8" TEST JT. -TEST CHOKE MANIFOLD, FLOOR SAFETY VALVES, BLIND SHEAR RAM, HCR, KILL VALVES. IBOP, -UPPER AND LOWER VALVES ON TOP DRIVE. - PERFORM ACCUMULATOR DRAW DOWN TEST. - TEST LEL ALARMS. -CHART RECORD ALL TESTS 5 MINUTES EACH. 22:30 - 00:00 r 1.50 CASING P DECOMP UD TEST JT. - INSTALL WEAR RING, RUN IN 4 LDS. 4/13/2012 00:00 - 01:30 1.50 CASING P DECOMP PJSM FOR P/U BHA # 27, 5 15/16" SWAGE. -M /U SWAGE, BIT SUB, 1- 4 3/4" DC, XO, BUMPER SUB, JAR, XO, 9- 6 V4" DC, XO, INTENSIFIER, XO. Printed 5/14/2012 11:14:20AM • North America - ALASKA - BP • Inge 46 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 ©48.40ft (above Mean Sea Level) Date From - To Hrs Task Code 1 NPT NPT Depth I Phase i Description of Operations (hr) (ft) 01:30 - 02:30 1.00 CASING P DECOMP RIH WITH 4" DP TO 2400' MD - S /O 95K, P/U 90K. -RIH TO 2454', SET DOWN 5K. -P /U 10' 02:30 - 03:00 0.50 CASING P DECOMP M/U TOP DRIVE. - PUMP 8 BPM, 470 PSI. -WASH DOWN TO 2502', CLEAN -P/U TO 2494' 03:00 - 04:00 1.00 CASING P DECOMP PJSM ON PLAN FORWARD. -CLOSE ANNULAR -OPEN VA TO TAKE RETURNS TO OPEN TOP FBT. -PUMP 110 DEG 8.5 PPG SEAWATER 4 BPM 300 PSI. - MONITOR HARDLINE KEEPING BELOW 150 PSI. -PUMP 180 BBLS TO FLOW BACK TANK. 04:00 - 06:00 2.00 CASING P DECOMP ! SHUT IN WELL CLOSING VA -FREEZE PROTECT HARDLINE. -WAIT 2 FIRS TO LET ANY POTENTIAL GAS SETTLE OUT OF FLOW BACK TANK. -LOAD 190 BBLS 110 DEG SEAWATER INTO PITS. 06:00 - 08:30 2.50 CASING P DECOMP PJSM. OPEN CHOKE SIDE HCR VALVE. - BLEED ANY PRESSURE, OPEN ANNULAR PREVENTOR. - RIH, SET DOWN ON TIGHT SPOT © 2511'. - CLOSE ANNULAR AND LINE UP THRU CHOKE TO OUTSIDE TANK. - COMPLETE REMAINDER OF CIRCULATION TO OPEN TOP TANK. - PUMP 180 BBLS HEATED SEAWATER, 4 BPM / 100 PSI. SHUT DOWN, BLEED ALL PRESSURE, OPEN ANNULAR PREVENTOR. 08:30 - 09:30 1.00 CASING P DECOMP WORK THRU TIGHT SPOT W/ 5 15/16" SWEDGE. - WORK FROM 2511' - 2517', NO JARRING NECESSARY. - TAG / WASH TO 2528'. 09:30 - 11:00 1.50 CASING P DECOMP PJSM. CIRC TO CLEAN UP HOLE. - MIX 25 BBLS HI VIS SWEEP & CIRCULATE SURFACE TO SURFACE. 6 BPM / 450 PSI. 470 BBLS TOTAL PUMPED. - NOTHING SIGNIFICANT BACK W/ SWEEP. - MONITOR WELL, WELL STABLE. - 1 11:00 - 12:30 1.50 CASING P DECOMP PJSM. POOH W/ 5 15/16" SWEDGE. 112:30 - 14:00 1.50 CASING P DECOMP PJSM. UD SWEDGING BHA. 14:00 - 15:00 1.00 CASING P j DECOMP PJSM. M/U CASING CUTTER ASSEMBLY. 15:00 - 16:30 ! 1.50 CASING P DECOMP PJSM. RIH W/ CASING CUTTER ASSEMBLY. 1- TAG @ 2520' DPM. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP a 47 of 69 Operation Summary Report . Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 1Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 I Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth Phase Description of Operations 16:30 - 17:30 1.00 FISH P (ft) L DECOMP PJSM. PICK UP TO 2500'. - UPWT88K,DOWNWT95K. - BRING ON PUMP AND PRESSURE TO 400 j PSI. - LOCATE COLLAR © 2509'. KICK OFF PUMP. - RIH, LIGHTLY TAG TIGHT SPOT @ 2511'. - WORK THRU BY ROTATING SLOWLY W/ PUMP OFF. j - TAG @ 2520', CALL ODE, INFORM THAT WE DESIRE TO CUT @ 2519'. - PFRMISSION GRANTED. CUT CASING a - PUMPING 3 BOM / 430 PSI, ROTATING 20 RPM AT CUT DEPTH. - GRADUALLY INCREASED PRESSURE TO 880 PSI @ 6 BPM. - OBSERVED PRESSURE DROP TO 250 PSI. STOP ROTATING & PUMPING. - PICK UP 8', BRING ON PUMP TO 750 PSI & SLACK OFF. - LOCATE OUT ON CUT, OBSERVE I PRESSURE DROP TO 300 PSI. 17:30 - 18:30 1.00 CASING P j DECOMP MONITOR WELL FOR 10 MINUTES. STATIC __ -POH WITH4" DRILL PIPE. 18:30 - 19:00 0.50 CASING P DECOMP MONITOR WELL BEFORE PULLING BHA. i I II STATIC. , 1 -PJSM FOR HANDLING BHA. I , -UD 5.5" MSC BHA # 28 - CUTTER AND BLADES INTACT. WEAR _ 1 SHOWS INDICATION OF SUCCESSFUL CUT. 19:00 - 19:30 0.50 CASING 1 P , ' DECOMP CLEAR AND CLEAN RIG FLOOR 19:30 21:00 1.50 CASING 1 P 1 DECOMP CIO GRAPPLE ON SPEAR . DECOMP BACK OUT 4 LDS. PULL WEAR RING. 21:30 22:30 � 1.00 CASING P - ! DECOMP IM/U 9.9" SPEAR BHA # 29. 1 1 -BULL NOSE, 10 3/4" PACKOFF, 9.9" SPEAR, ' SPEAR EXTENSION, STOP SUB, I ' BUMPER JAR, JAR, XO, 9- 6 1/4" DC, XO, INTENSIFIRE, XO 22:30 - 23:30 1.00 CASING P 1 DECOMP RIH WITH 4" DRILL PIPE. I -TAG UP AT 2374' 23:30 - 00:00 0.50 CASING P DECOMP !M /U TOP DRIVE. I j -P /U 89K. S/O 91K. I -PUMP 6 BPM 250 PSI. ' _ I — - START WASHING FROM 2374' ■ 4/14/2012 100:00 - 00:30 0.50 FISH 1 P DECOMP ENGAGE FISH AT 2379' -WASH TO 2387' WITH GRAPPLE INSIDE OF ' i 103/4" CSG. I -SHUT DOWN PUMP. -PULL FREE AT 180K. -P /U FINDING BUMPER JAR TRAVEL. I 1 -USE BUMPER JAR TO ENGAGE GRAPPLE. — — I — I — -P /U 10' — — Printed 5/14/2012 11:14:20AM North America - ALASKA BP , a of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 ' End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) i 00:30 - 01:45 1.25 FISH P DECOMP PJSM ON PLAN FORWARD. -CLOSE ANNULAR ■ -OPEN VA TO TAKE RETURNS TO OPEN TOP FBT. -PUMP HEATED DEG 8.5 PPG SEAWATER 4 BPM 180 PSI. 1 - MONITOR HARDLINE KEEPING BELOW 150 I PSI. 1 -PUMP 180 BBLS WITH RETURNS TO FLOW ; SH U T IN TANK. 01:45 - 03:45 2.00 FISH P WELL ! DECOMP (SHUT IN WE CLOSING VA '- FREEZE PROTECT HARDLINE. -ROLL PUMP EVERY 30 MINUTES TO KEEP 1 TOP DRIVE FROM FREEZING. -WAIT 2 HRS TO LET ANY POTENTIAL GAS 1 SETTLE OUT OF FLOW BACK TANK. -LOAD 210 BBLS HEATED SEAWATER INTO ! _ PITS. _ 03:45 - 04:45 1.00 FISH P DECOMP VAC TRUCK EMPTY OUT FBT. 04:45 - 06:00 1.25 FISH I P DECOMP LINE UP VA TO FBT. I -PUMP ANOTHER 180 BBLS HEATED SEAWATER. 1 ! -PUMP 5 BPM 200 PSI. 1 I- MONITOR HARDLINE KEEPING BELOW 150 1 I PSI. 1 � - 360 BBLS TOTAL PUMPED. - MONITOR WELL, WELL STABLE. L L - F/P LINE TO OUTSIDE TANK. 06:00 - 07:30 1.50 FISH P DECOMP RIH, NOT GETTING DOWN AS FAR AS WHEN LATCHING FISH FOR 1ST TIME. - BRK CIRCULATION, ROTATE (1) TIME TO I 1THE LEFT AND FINALLY ENGAGE FISH, (FULLY). - PICK UP AND OBSERVE OVERPULL, PULL TO 200K. ■ - JAR SEVERAL TIMES @ 150K AND PULL ON i 1 UP TO 200K, NO MOVEMENT. - ATTEMPT TO BREAK CIRCULATION, PRESSURE UP TO 1500 PSI. - ZERO BLEED OFF, NO RETURNS. - JAR SEVERAL MORE TIMES © 160K, PULL 1 ■ ! ON UP TO 200K. - ZERO MOVEMENT, NEED TO BREAK OFF 1 I TOP DRIVE OR FREEZE UP. - SET DOWN TO NEUTRAL, ROTATE TO THE RIGHT, RELEASE FROM FISH. - ESTABLISH CIRCULATION ... 07:30 - 09:00 1.50 FISH P 1 DECOMP PJSM. BREAK OFF TOP DRIVE & BLOW DOWN. - PERFORM PRE JARRING DERRICK INSPECTION. 1 I 1 - COMMUNICATE W/ ODE AS REGARDING 1 i I 1 CURRENT OPS AND PLAN FORWARD. _ Printed 5/14/2012 11:14:20AM North America ALASKA - BP Page 49 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date ; From - To Hrs j Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:00 1.00 FISH P DECOMP ' ESTABLISH PARAMETERS, 88K UP WT, 95K DOWN WT. 1 - ATTEMPT TO RE ENGAGE FISH SEVERAL ( TIMES. - ABLE TO GET ALL THE WAY DOWN, UNABLE TO ENGAGE FISH. - BTM OF SPEAR @ 2389', NO GO @ 2379'. - PULL SPEAR OUT OF FISH WITHOUT ENGAGING. 10:00 - 12:00 2.00 FISH P DECOMP PJSM. POOH F/ 2389' W/ FISHING ASSEMBLY. - MONITOR WELL, WELL STABLE. - CALL ODE AND AGREE TO RUN 8.5" j SWEDGE. 12:00 - 14:30 2.50 FISH P DECOMP 1 PJSM. UD FISHING BHA. - INSPECT SAME, GRAPPLE STUCK IN RELEASE POSITION. - PACK OFF SHOWING SOME SIGNS OF STARTING TO WASH OUT. - AOGCC STATE REP JEFF JONES NOTIFIED THAT GAS MONITORING SYSTEM IS FULLY OPERATIONAL. 14:30 - 15:30 1.00 FISH P DECOMP PJSM. SET WEAR BUSHING, RILDS. 15:30 - 17:00 1.50 CASING P DECOMP 1PJSM. P/U SWEDGING BHA. 8.5" OD SWEDGE, BUMPER SUB, JAR, XO, 9- i 6 1/4" DC, XO, INTENSIFIRE, XO. 17:00 - 18:00 1.00 CASING P DECOMP RIH WITH 21 STDS DP. -TAG STUMP AT 2379'. - CONTINUE RIH WITH 23 TOTAL STDS DP. -M /U TOP DRIVE. -P /U WT 90K. S/O WT 95K. 1 - REMOVE ROLLER BEARINGS FROM QUILL 1 BEFORE JARRING. 18:00 - 21:00 3.00 CASING P DECOMP PUMP AND WASH FROM 2417' TO 2428' -PUMP 5 BPM 2200 PSI. RECIPROCATE PIPE. -PUMP 20 BBL HI VIS SWEEP AROUND, CLEAN AT RETURNS. - CONTINUE TO WASH DOWN FROM 2428' TO 2511' AT COLLAPSE. -BLOW DOWN TOP DRIVE. 21:00 - 22:00 1.00 CASING P DECOMP I JAR AND OPEN UP COLLAPSE SECTION. -FROM 2511' TO 2521' 122:00 - 22:30 0.50 CASING P DECOMP BREAK CIRCULATION MAKING SURE SWAGE NOT PLUGGED. - PUMPING 4 BPM @ 250 PSI. -BLOW DOWN TOP DRIVE 22:30 - 23:30 1.00 CASING P DECOMP CONTINUE TO JAR AND SWAGE OPENING COLLAPSE FROM 2519' TO 2521' - WORKING THROUGH COLLAPSE SECTION OF 9 5/8" CASING - 23 STDS AND 2' OF SINGLE DRILL PIPE 23:30 - 00:00 0.50 CASING P DECOMP UD SINGLE DRILL PIPE -P /U OUT OF TIGHT SPOT, 35K OVERPULL- FREE @ 2468' -PJSM FOR DERRICK INSPECTION. - PERFORM DERRICK INSPECTION FOR JARRING. 4/15/2012 00:00 - 01:00 1.00 CASING P j DECOMP CONTINUE WITH JARRING INSPECTION. INSPECT DERRICK, DRWKS, DEADMAN, AND CELLAR. Printed 5/14/2012 11:14:20AM North America - ALASKA - BPige 50 Operation Summary Report - " Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i _ (ft) _ 01:00 - 01:30 0.50 i CASING P DECOMP 1 JAR DOWN ATTEMPTING TO SWAGE FROM @ 2520'. F_UNSUCCESSFUL, MAKE UP TOP DRIVE 01:30 - 03:45 2.25 CASING P DECOMP CIRCULATE AND WASH DOWN @ 6 BPM WITH 170 PSI FROM 2520' TO 2527' - CIRCULATE 2 - 20 BBL SWEEPS. - RECIPROCATE PIPE. -NO OVERPULLS, CLEAN. -WITH SWEEP RETURNS, SOME SAND AT 1 — — SHAKER. 03:45 - 04:00 0.25 CASING P DECOMP MONITOR WELL. STATIC. -BLOW DOWN TOP DRIVE. 04:00 - 05:30 1.50 CASING P DECOMP , POH, SLIGHT OVERPULL AT 2470' -WORK THROUGH TIGHT SPOT SEVERAL (TIMES UNTILL CLEAR. - CONTINUE P011. -MONITOR WELL BEFORE PULLING BHA. STATIC. 05:30 - 07:00 1.50 CASING P DECOMP CONTINUE TO POOH. - PJSM. UD SWAGING BHA. 07:00 - 08:00 1.00 CASING P DECOMP CLEAR / CLEAN RIG FLOOR. 08:00 - 08:30 0.50 CASING P DECOMP PJSM. P/U 8 1/4" CASING CUTTER BHA. - INSPECT CUTTER, CUTTER BLADES NOT FULLY RETRACTING. - ORDER NEW CUTTER FROM BAKER SHOP. 1- ATTEMPT TO REBUILD CUTTER ON RIG, 'TOO MUCH KENPAK IN IT. 08:30 - 10:00 1.50 CASING j N WSEQT DECOMP ! WAIT ON NEW CUTTER TO ARRIVE FROM BAKER. 10:00 - 10:30 0.50 CASING 1 P DECOMP M/U NEW CUTTER BHA. 10:30 - 12:00 1.50 CASING P DECOMP PJSM. MONITOR WELL, WELL STABLE. - RIH W/ CASING CUTTER BHA. CONCURRENT WITH RIG OPS- , CONDUCT WEEKLY SAFETY MEETING COW AND RECENT INCIDENT COVERED. 12:00 - 13:00 1.00 r CASING P ! DECOMP SERVICE RIG, GREASE CROWN, SERVICE TOP DRIVE. 13:00 - 15:00 2.00 j CASING P DECOMP I CONTINUE IN HOLE. - TAG UP @ 2522'. THIS PUTS CUTTER BLADES @ 2518'. - UNABLE TO WASH DOWN, CONSULT WITH ODE. - DECISION MADE TO POOH & RUN RCJB. _ MONITOR WELL, WELL STABLE. _ 15:00 - 16:00 1.00 CASING P DECOMP 1 PJSM. POOH W/ CASING CUTTER BHA 1- MONITOR WELL, 10 MIN / WELL STABLE. 16:00 - 17:30 1.50 CASING P j DECOMP PJSM. UD CASING CUTTER BHA. MONITOR WELL. STATIC. CLOSE BLIND RAMS. 17:30 - 18:00 0.50 CASING P DECOMP CLEAR AND CLEAN RIG FLOOR. -WITH 0 PSI SHUT IN, OPEN CHOKE, OPEN BLIND RAMS. 18:00 - 19:00 1.00 CASING P DECOMP PJSM FOR P/U BHA # 32. I M/U 7 7/8" JUNK BASKET, OD OF SHOE= 8.125 ". BARREL LENGTH= 5.63', 3- 7" BOOT BASKETS, BIT SUB, BUMPER SUB, JAR, XO, 9- 6 1/4" DC, X0, PUMPOUT SUB, _ X0= 329.57' Printed 5/14/2012 11:14:20AM 40 - 5i Of $9 North America - ALASKA BP Page Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) I Start Date: 3/19/2012 End Date: 4/27/2012 1 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM I Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date I From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 20:30 1.50 CASING P DECOMP RIH WITH 4" DP. -P /U WT 85K, S/O WT 95K. -TAG UP AT 2379' ON 10 3/4" STUB. -M /U TOP DRIVE, ROTATE 10 RPM AND WORK ; PAST STUB. _ 20:30 - 20:45 0.25 CASING P DECOMP ' PUMP 6 BPM 250 PSI. -RIH TO 2508' -SHUT DOWN PUMP, BREAK OFF TOP DRIVE. -DROP 1" STEEL BALL, P/U SINGLE. -MAKE UP TOP DRIVE. -RIH WITH PUMP OFF TAGGING JUNK AT 2521' 20:45 - 22:00 1.25 CASING P DECOMP i P/U 10' ROTATE 40 RPM SETTING DOWN TO ! 2522' -PUMP 7 BPM 730 PSI. 2 -2.5K TORQUE - WORKING SEVERAL TIMES DOWN TO 2527.4' - SETTING DOWN 5-10K SWALLOWNG JUNK IN HOLE. 22:00 - 23:00 1.00 CASING P DECOMP CONTINUE ROTATING 20 RPM MOVING PIPE. -PUMP 20 BBL HI VIS SWEEP AROUND - PUMPING 7 BPM 720 PSI, RECIPROCATE PIPE. -SOME SAND AT SHAKERS ON SWEEP ;RETURNS. 23:00 - 23:30 0.50 CASING P DECOMP I UD SINGLE. - MONITOR WELL. STATIC. -BLOW DOWN TOP DRIVE. 23:30 - 00:00 0.50 CASING P DECOMP POH WITH REVERSE JUNK BASKET BHA # 32 - CONCURRENT WITH RIG OPS, CONDUCT WEEKLY SAFETY MEETING WITH ONCOMING CREW. - DISCUSS WARMING WEATHER- SLICK I ROADS. -NEW 5 MIN ESCAPE PACKS ON RIG, TRAIN CREW ON USE. - REVIEW SAFETY BULLETINS. - REVIEW ACTION ITEMS, REVIEW UPDATED PROCEDURES. 4/16/2012 00:00 - 01:30 1.50 CASING P DECOMP i POH WITH 7 7/8" REVERSE BASKET BHA # 32 MONITOR WELL 10 MINUTES BEFORE BHA. STATIC. OOA AND 000A= 0 PSI. -PJSM FOR HANDLING BHA. 01:30 - 03:30 ( 2.00 CASING P DECOMP STAND BACK DRILL COLLARS. -PULL BASKETS. -WELL STABLE- CLOSE BLIND RAM. HUD REVERSE BASKET - RECOVERED 2 CENTRALIZER BANDS, NUMEROUS BOW SPRINGS. - SMALLER PIECES OF METAL AND 1 PIECE OF DIE MATERIAL. -EMPTY JUNK BASKETS, RECOVER 2 GALLONS MOSTLY KENPAC AND SOME METAL PIECES. PICTURES ATTACHED TO OPEN WELLS. -NOTIFY ODE, DECISION MADE NOT TO MAKE ANOTHER JUNK RUN. 03:30 04:00 0.50 CASING P DECOMP CLEAN AND CLEAR RIG FLOOR. -PJSM FOR M/U 8 1/4" MSC BHA # 33 -0 PSI ON SHUTIN WELL. OPEN CHOKE, OPEN I BLIND RAMS. Printed 5/14/2012 11:14:20AM Rage 52 0 North America - ALASKA - BP 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 ;Z3-001 LM-E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 CASING P DECOMP M/U BHA # 33 -BULL NOSE, 8 1/4" MSC, XO, XO, 9- 6 1/4" DC, XO, XO= 288.69' 05:00 - 06:30 1.50 CASING P DECOMP j RIH WITH 4" DP & CUTTER ASSEMBLY. 06:30 - 08:30 2.00 FISH P 1 DECOMP PJSM. ESTABLISH PARAMETERS. 95K UP WT, 89K DOWN WT. - RIH TO 2526', NO TAG, WELL BORE CLEAN. - PICK UP, BRING ON PUMP 4 BPM / 420 PSI. - LOCATE OLD CUT @ 2519.5'. SET DOWN 5K. - SHUT DOWN PUMP, PICK UP AND ROTATE 20 RPM. - SLACK OFF TO WITHIN 5" OF OLD CUT, BRING ON PUMP. - BRING PUMP UP TO 4 BPM / 420 PSI, ROTATE 30 RPM. - GENTLY SLACK OFF UNTIL TAKING JUST THE SLIGHTEST WEIGHT. 1- BRING PUMP UP TO 7 BPM / 800 PSI, ROTATING 50 - 60 RPM. ' - DO THIS FOR (1) HOUR WITHOUT ANY PRESSURE DROP. STOP ROTATING, SHUT DOWN PUMP, PICK UP, BRING ON PUMP. - SLACK OFF AND LOCATE CUT DEPTH, 2519.5', STACK 5K. 08:30 - 10:00 C 1.50 FISH P DECOMP PJSM. MONITOR WELL 10 MINUTES, WELL A STABLE. - POOH W/ CUTTER ASSEMBLY. 10:00 - 10:30 0.50 FISH P DECOMP PJSM. MONITOR WELL 10 MIN, WELL STABLE. 1- STAND BACK DRILL COLLARS. 10:30 - 11:30 1.00 FISH P DECOMP PJSM. CLEAR / CLEAN RIG FLOOR. - PULL KNIVES FROM CUTTER AND INSPECT SAME. - BOTTOM OF EACH KNIFE SHOWING WEAR GROOVE 1/2" FROM CUTTER BODY. VERY GOOD INDICATION OF COMPLETED CUT IN 95/8" CASING. 11:30 - 12:00 0.50 FISH P DECOMP PJSM. PULL WEAR RING. 12:00 - 13:30 1.50 FISH P DECOMP i SERVICE RIG, REMOVE ROLLERS. 13:30 - 15:00 1.50 FISH P DECOMP PJSM. M/U SPEAR BHA. - CHANGE OUT GRAPPLES. _ 15:00 - 16:00 1.00 FISH P DECOMP PJSM. RIH TO 2321' W/ FISHING BHA. 16:00 - 17:30 1.50 FISH P ! DECOMP PJSM, REVIEW DDI SOP FOR SLIP AND CUT DRILLING LINE. -CUT AND SLIP 54' OF DRILLING LINE. - INSPECT LINE GUIDE ROLLERS AND DRWKS BRAKES. -WSL CHECKED 000A, ON A SLIGHT VAC. -OOA DEAD _ -OA HAS SLIGHT TRICKLE. 17:30 - 18:00 0.50 FISH i P 1 DECOMP PERFORM PRE JARRING INSPECTION OF DERRICK AND TOP DRIVE. W W 18:00 - 18:30 0.50 FISH P DECOMP P/U T 86K. S/O T 95K - ENGAGE FISH AT 2379' -TAG STOP RING 10' IN ON SPEAR WITH BULLNOSE AT 2389'. -SET DOWN 15K ON STUB. -P /U TO 140K, BLEED JARS OPEN TO 175K Printed 5/14/2012 11:14:20AM ilk North America - ALASKA - BP 411/ Page 53 of 69 • Operation Summary Report Common Well Name: PR331213 I AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase i Description of Operations (hr) (ft) . ,L 18:30 - 20:00 1.50 FISH P I DECOMP SECURE RIG FLOOR AND CELLAR. - PROCEED WITH JARRING OPEATIONS. -JAR ON 10 3/4" X 9 5/8" CASING. -JAR 150K OVERPULLING TO 175K. - WORKING AND JARRING UP TO 250K, OVERPULLING TO 300K -NO MOVEMENT AFTER 21 JAR HITS. NOTIFY ODE AND FIELD SUPERINTENDANT OF STATUS, DISCUSS PLAN FORWARD. DECISION MADE TO SEE IF 10 3/4" X 9 5/8" FROM PACKOFF TO CIBP WOULD HOLD PRESSURE. 1 -TO 2500 PSI. 20:00 - 21:00 1.00 FISH P DECOMP PJSM, PUMP AND PRESSURE UP ON 103/4" X 9 5/8" TO 1100 PSI, SOME RETURNS AT FLOWLINE. - PUMP RATE GRADUALLY INCREASED TO 4 BPM / 1100 PSI. - LOST 20 BBLS, VERY SLIGHT RETURNS. - MONITOR OOA AND 000A, PRESSURES- REMAIN AT 0 PSI. -PUMP A TOTAL OF 22 BBLS. NOTIFY ODE, DECISION MADE TO RELEASE SPEAR AND POH TO CUT BELOW 10 3/4" X 9 5/8" XO, LOCATE 1 COLLAR AT 2468'. -CUT AT 2448' 21:00 - 22:00 1.00 FISH P DECOMP RELEASE SPEAR, POH WITH 1 STAND. - MONITOR WELL. STATIC, WHILE PERFORMING POST JARRING INSPECTION ON DERRICK AND DRWKS. -BLOWDOWN TOP DRIVE. 22:00 - 23:30 1.50 FISH P DECOMP POH WITH SPEAR BHA # 34 MONITOR WELL BEFORE PULLING BHA. 1 STATIC. 23:30 - 00:00 0.50 r FISH P DECOMP ! POH, STAND BACK DRILL COLLARS. UD SPEAR BHA. 4/17/2012 00:00 - 00:30 0.50 FISH P DECOMP FINISH UD 9.9" SPEAR BHA # 34 - INSPECT SPEAR. 00:30 - 01:00 0.50 CASING P DECOMP -CLOSE BLIND RAMS -CLEAR AND CLEAN RIG FLOOR. - SERVICE RIG FLOOR EQUIPMENT. -RE- INSTALL ROLLER BEARINGS ON TOP DRIVE QUILL. 01:00 - 01:30 0.50 CASING P j ! DECOMP INSTALL WEAR RING. RUN IN 4 LDS. 01:30 - 02:30 1.00 CASING P DECOMP INSTALL NEW CUTTER BLADES ON MSC. -0 PSI ON WELL, OPEN BLIND RAMS. WELL STATIC. -M /U BHA # 35, BULL NOSE, 8 1/4" MSC, XO, XO, 9- 6 1/4" DC ,XO, XO= 288.69' 02:30 - 04:30 2.00 CASING P DECOMP RIH WITH 4" DP & CUTTER ASSEMBLY. OOA= OPSI, 000A= 0 PSI. 04:30 - 05:00 0.50 FISH P j DECOMP P/U SINGLE - MAKEUP TOP DRIVE. -BRING ON PUMP. - LOCATE COLLAR IN 95/8" AT 2468' -UD SINGLE P/U 20' TO CUT DEPTH AT 2448' Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 54 of 69 Opera Sumiritary';Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) I Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM ; Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. I UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hr 05 :00 - 06:00 1.00 FISH P (ft) DECOMP ESTABLISH PARAMATERS.... 88K UP WT, 95K DOWN WT. - ROTATE, 30 RPM. - GRADUALLY BRING ON PUMP 4 BPM 410 PSI. INCREASE PUMP RATE TO 7 BPM / 950 PSI. - ROTATING @ 60 RPM, OBSERVE PRESSURE ■ DROP 5 MIN INTO CUTTING OPERATION. - SLACK OFF JUST A WEE BIT AND CONTINUE WITH CUTTING OP. - STOP ROTATING, SHUT DOWN PUMP. - PICK UP, BRING ON PUMP, SLACK OFF TO 2448', STACK 5K, CONFIRM CUT. _ - MONITOR WELL / 10 MIN / WELL STABLE. 06:00 - 07:30 1.50 FISH P DECOMP PJSM. BLOW DOWN TOP DRIVE. - POOH TO 251', MONITOR WELL 10 MIN / WELL STABLE. 07:30 - 08:30 1.00 FISH P DECOMP PJSM. UD CUTTER BHA, REMOVE KNIVES FROM CUTTER. - KNIVES SHOW GOOD INDICATION OF I SUCCESSFUL CUT. 108:30 - 09:00 0.50 FISH P DECOMP I PJSM. PULL WEAR RING. 09:00 - 10:00 1.00 FISH P DECOMP PJSM. P/U FISHING BHA TO FISH 10 3/4" X 9 5/8" CSG. - REPLACE GRAPPLE ON SPEAR. - MONITOR WELL, 10 MIN / WELL STABLE 10:00 - 12:00 2.00 FISH P DECOMP PJSM. RIH W/ FISHING BHA ON 4" DP. - RIH TO 2036'. UP WT 84K, DOWN WT 90K. 12:00 - 13:30 1.50 FISH P DECOMP PJSM. PREP TO JAR ON FISH. - SERVICE RIG, REMOVE ROLLERS FROM TOP DRIVE. - CONDUCT PRE JARRING INSPECTION ON DERRICK, OK. 13:30 - 14:00 0.50 FISH P DECOMP CONTINUE IN HOLE, LOCATE OUT ON 10 3/4" STUB. - UP WT 85K, DOWN WT 90K. TOP OF FISH @ 2379'. 14:00 - 15:00 1.00 FISH P DECOMP PJSM. CLEAR RIG FLOOR. - SPEAR ENGAGED, PULL TO 175K, SET OFF JARS. - PULL TO 200K, NO MOVEMENT. - JAR @ UP TO 225K, PULL TO 300K, ZERO MOVEMENT. - APPROXIMATELY 11 JAR LICKS AND OVER PULLS. ' - ZERO MOVEMENT, CONSULT ODE. - DISENGAGE FROM FISH, PREP TO POOH. - MONITOR WELL, 10 MIN / WELL STABLE. 15:00 - 17:00 2.00 FISH P DECOMP PJSM. POOH W/ FISHING BHA. - AT BHA, MONITOR WELL 10 MIN / WELL STABLE. AOGCC REP NOTIFIED OF DESIRE TO TEST BOPE (1) DAY EARLY - THIS WAS 24 HR NOTICE, WILL UPDATE I TOMORROW. 17:00 - 18:30 1.50 FISH P DECOMP STAND BACK COLLARS - MAKE SERVICE BREAKS ON SPEAR - LAY DOWN SPEAR — �— -_ — - CLEAR RIG FLOOR Printed 5/14/2012 11:14:20AM , 0 North America - ALASKA - BP Pa 55 o AA of 69 Oper Summary Re Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) __ (ft) 18:30 - 19:00 0.50 CASING P DECOMP FLUID PACK OOA & 000A j - R/U LINES TO PUMP DIESEL DOWN THE OOA, TAKE RETURNS FROM 000A TO SLOP 1 I TANK - PUMP TOTAL OF 60 GALLONS TO GET RETURNS, LINE PRESSURE WAS 100 PSI 1 1 j R/D LINES 19:00 - 20:00 1 1.00 I CASING 1 P DECOMP TEST 133/8" CASING - CLOSE BLINDS AND ATTEMPT TO TEST CASING TO 2500 PSI - MONITOR PRESSURE ON OOA & 000A I - PRESSURE BROKE OVER AT 880 PSI 1 - OOA & 000A PRESSURES INCREASED TO I ; 55 PSI WHEN CASING PRESSURE WAS 880 1 IPSI I ! ' - OOA & 000A PRESSURES DECREASED , WHEN CASING PRESSURE DECREASED - ESTABLISHED AN INJECTION RATE OF 860 PSI AT 1.5 BPM - INJECTED A TOTAL OF 7.5 BBLS I H NOTIFIED ODE, DISCUSSED PLAN FORWARD - R/D TEST EQUIPMENT, BLOW DOWN LINES 20:00 - 20:30 0.50 WHSUR P ' DECOMP INSTALL WEAR RING I � - WEAR RING ID = 12.25 20:30 - 22:30 I 2.00 FISH P I DECOMP PJSM, M/U 12" OD SWAGE BAKER BHA #37 - MOBILIZE BHA TO RIG FLOOR 1- M/U 12" OD SWAGE, BUMPER SUB, DRILLING JARS, COLLARS, INTENSIFIER 22:30 - 00:00 1.50 FISH P i I DECOMP 1 RIH ON DRILL PIPE - TAG TIGHT SPOTS FROM 471' TO 475', AND 495' TO 501' j - PUSHED THROUGH BOTH SPOTS WITH 12K , i I DOWN WEIGHT - PULLED BACK THROUGH WITH 12K DRAG / I iOVERPULL I 1 - WORKED THROUGH EACH SPOT 5X EACH WITH NO JAR ACTION 4/18/2012 00:00 - 04:30 4.50 , FISH P DECOMP CONTINUE RIH WITH DP I - RIH WITH 12" OD SWAGE BHA - WORK THROUGH TIGHT SPOT AT 863' - 869' MD, WEIGHT ON SWAGE AND OVERPULL = —20K TO 40K WITH NO JAR ACTION I - WORK THROUGH OTHER TIGHT SPOTS WITH —12K TO —20K, UP AND DOWN I WEIGHTS - 471' - 475' ,495' - 501',570' - 578',602' -609', ! 654' - 662, 766' - 778', 1062' - 1067', 1087' - 1097', 1264' - 1269', 1373' - 1380', 1398' - 1404', 1454' - 1460',1547' - 1552', 1620' - 1629' MD'S WITH NO JAR ACTION - CONTINUE RIH FROM 1629' TO 2379' MD 1 _ WITH NO RESTRICTIONS 1 04:30 - 06:00 1.50 CASING P DECOMP MAKE UP TOP DRIVE '- PUMP SWEEP SURFACE TO SURFACE ■ I 1 - 5BPM = 110PSI 1 - MONITOR WELL / 10 MIN / WELL STABLE. __ 06:00 - 08:30 2.50 CASING P DECOMP PJSM. POOH W/ SWAGING BHA. I I - MONITOR WELL @ BHA / 10 MIN / WELL 1STABLE. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP " Page 56 of 89 Operation Summary Report Common Well Name: PR331213 I AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 'Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: _ Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs • Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 10:00 1.50 CASING P DECOMP PJSM. UD SWAGING BHA. - NO FLUID GAINED OR LOST DURING TRIP OOH. - CLOSE BLIND RAMS, WELL SECURED. 10:00 - 11:30 1.50 CASING P DECOMP CONDUCT MEETING WITH JAMES WILLINGHAM AND RICH BURNETT. - MEETING REVIEWED INCIDENT AND 1FINDING REGARDING MP L -06. - HIGHLIGHTED IMPORTANCE OF FOLLOWING PROCEDURES AND KNOWING YOUR BARRIERS. - THIS IS AN ACTION ITEM FOR GOING BACK TO WORK / KILLING WELLS. 11:30 - 12:00 j 0.50 CASING P DECOMP ' PRE TOUR MEETING AND CREW CHANGE — — OUT. 12:00 - 14:00 2.00 CASING P DECOMP CONDUCT MEETING WITH JAMES WILLINGHAM AND RICH BURNETT. - MEETING REVIEWED INCIDENT AND FINDING REGARDING MP L -06. - HIGHLIGHTED IMPORTANCE OF FOLLOWING PROCEDURES AND KNOWING YOUR BARRIERS. - THIS IS AN ACTION ITEM FOR GOING BACK TO WORK / KILLING WELLS. 14:00 - 15:00 1.00 CASING P DECOMP CONDUCT POST JARRING INSPECTION ON DERRICK. - NO ANOMALIES FOUND. 15:00 - 15:30 0.50 CASING P j DECOMP FINISH BREAKING DOWN SWAGING BHA. 15:30 - 17:30 2.00 CASING P DECOMP PJSM. P/U DRESS OFF BHA #38 - PICK UP 9.70" OD WATERMELON MILL TO DRESS INSIDE OF 103/4" CASING. I I - STATE AOGCC REP MATT HERRERA NOTIFIED OF IMPENDING BOPE TEST. - STATE'S RIGHT TO WITNESS BOPE TEST _ WAIVED BY MATT HERRERA. 17:30 - 18:30 1.00 CASING ! P DECOMP RIH W/ 4" DP - M/U TOP DRIVE 18:30 - 19:30 i 1.00 CASING P DECOMP DRIFT INSIDE 10 3/4" CUT AT 2379' MD - SEE 5K DRAG AT TOP OF STUB WHEN POLISH MILL ENTERED, THEN SMOOTH DOWN TO 2397' MD - PUWT = 90K, SOWT = 95K, ROTW = 93K, 40 RPM = 2K TQ, 5 BPM = 110 PSI - DRESS ID OF 10 3/4" CASING 10X - PASS THROUGH WITH NO ROTATION = NO DRAG 119:30 - 20:30 1.00 CASING P DECOMP CBU 1X 6 BPM = 160 PSI - MONITOR WELL 10 MINUTES = STATIC 20:30 - 21:30 1.00 CASING P DECOMP POOH F/ 2397' MD - MONITOR WELL 10 MINUTES AT BHA = STATIC 21:30 - 23:00 1.50 CASING P DECOMP UD POLISH MILL BHA - STAND BACK 6 1/4 COLLARS 23:00 - 00:00 1.00 CASING P DECOMP R/U TO TEST BOPE - SUCK OUT STACK - PULL WEAR RING - INSTALL TEST PLUG - M/U TIW AND DART VALVE TEST ASSY Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 57 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) I Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM ; Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. ; UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date I From - To Hrs r Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/19/2012 00:00 - 01:30 1.50 CASING P DECOMP PJSM, R/U TO TEST BOPE INSTALL 9 5/8" TEST JOINT AND TEST PLUG I �- FILL STACK AND CHOKE MANIFOLD OOA = "0" PSI, 0 = "0" PSI 01:30 - 07:30 6.00 CASING P 1 , DECOMP TEST BOPE'S I - TEST ALL BOPE TO 250 PSI LOW, 3500 PSI I HIGH, 5 MINUTES CHARTED EACH - TEST UPPER PIPE RAMS WITH 9 5/8" TEST JOINT - TEST CHOKE MANIFOLD VALVES, (2) TIW'S, DART VALVE, HCR CHOKE AND KILL, MANUAL I I CHOKE AND KILL - REMOVE 9 5/8" TEST JOINT 1 - TEST BLIND RAMS - INSTALL 4" TEST JOINT ■ - TEST LOWER 3 1/2" X 6" VARIABLE PIPE RAMS AND UPPER IBOP - TEST ANNULAR AND LOWER IBOP ! 1- PERFORM TEST ON SUPER CHOKE AND MANUAL CHOKE - PERFORM ACCUMULATOR DRAW DOWN I TEST: I j 1- RIG DOWN TEST EQUIPMENT. ■ i 1 - STATE'S RIGHT TO WITNESS BOPE TEST WAIVED BY MATT HERRERA. 07:30 - 08:00 0.50 CASING P DECOMP CLEAR / CLEAN RIG FLOOR. f - PJSM ON RIGGING UP TO CIRCULATE. 08:00 - 11:00 3.00 CASING P DECOMP i RIG UP PUMP LINE TO PUMP DOWN OO/A I I 1- LINE UP VALVES TO PUMP DOWN OO /A AND i I TAKE RETURNS UP 000 /A. ! - TAKING DIESEL RETURNS TO SLOP TANK. - POSITION TRUCKS, STATION HANDS. 1- PRESSURE TEST LINES 250 / 1000 PSI, 5 MIN EACH / CHARTED. 1 11:00 - 12:30 1.50 CASING P DECOMP PJSM W/ REGARD TO CIRCULATING DIESEL ', OUT. - CHECK FOR PRESSURE, OPEN BLIND RAMS, FILL HOLE. - COMMENCE CIRCULATING HEATED SEAWATER DOWN OO /A. !- 3 BPM / 100 PSI, VERIFY DIESEL RETURNS TO SLOP TANK. 1 - BRING RATE UP TO 5 BPM / 300 PSI. - MONITOR WELL BORE FOR ANY SIGN OF COMMUNICATION. I I - WELLBORE STABLE, CIRCULATE 300 BBLS DIESEL TO SLOP TANK. 12:30 - 15:30 3.00 CASING I l P DECOMP , EMPTY SLOP TANK W/ VACUUM TRUCK, ' BRING IN TRUCK W/ CLEAN SEAWATER. - FILL PITS W/ HEATED SEAWATER, RESUME CIRCULATION. - 500 BBLS HEATED SEAWATER TOTAL i PUMPED, CLEAN SEAWATER RETURNS. 15:30 - 16:00 ! 0.50 CASING I P DECOMP PRE JOB MEETING WITH REGARD TO ' RUNNING CASING. - EMPHASIS ON COMMUNICATION, PINCH POINTS AND PIPE SKATE SAFETY. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 58 ,f 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 I End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM I Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. 1UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — — (ft) 16:00 - 18:30 i 2.50 CASING P DECOMP RIG UP ELEVATORS AND CASING EQUIPMENT. - REVIEW ORDER OF EQUIPMENT TO BE RUN. _ 18:30 - 00:00 5.50 CASING P DECOMP : . • -:1 : - M/U MULE SHOE PUP JOINT WITH "4" 1" HOLES FOR CIRCULATING - M/U 1 JOINT, AND FLOAT COLLAR - RIH WITH 95/8" CASING TO 1909' MD - FILL EVERY 5 STANDS 4/20/2012 00:00 - 02:00 2.00 CASING P DECOMP I PJSM, CONTINUE RUN 95/8 47# L -80 BTC j h CASING - RUN CASING FROM 1909' TO 2357' MD c./4")' 02:00 - 03:30 1.50 CASING P DECOMP ; TAG UP AND SPACE OUT - M/U PUMP IN SUB AND CEMENT LINE ON "LANDING JOINT' JT #57 - PUMP AT 3 BPM = 90 PSI - OBSERVE MULE SHOE TAG TOP OF STUB AT 2380' MD - CONTINUE TO SLACK OFF INTO 10 3/4" STUB AND NO-GO AT 2389' MD I - NO SIGNIFICANT PRESSURE INCREASE I WHEN PORTS ENTERED STUB H MARK NO-GO AND SPACE OUT TO ENSURE COLLAR IS NOT ACROSS WELL HEAD AND ' CEMENT HEAD IS AT A GOOD WORKING HEIGHT - UD LANDING JOINT AND JOINT #56 - M/U 95/8" CASING PUP JOINT = 9.80 LENGTH AND RIH - M/U JT #56 AND RIH M/U 20.05 AND 4.60 LENGTH PUP JOINTS TO RIG FLOOR - ENTER STUB AND NO-GO, AND MARK PIPE - UP WT = 130K, DOWN WT = 143K. 03:30 - 05:00 1.50 CASING P DECOMP PJSM ON R/D CASING EQUIPMENT AND R/U CEMENT EQUIPMENT - RIG DOWN CASING EQUIPMENT - R/U LONG BALES AND ELEVATORS - M/U CEMENT HEAD - R/U CEMENT HOSE TO CIRCULATE 80 DEGREE SEA WATER - 05:00 - 09:30 4.50 CASING P DECOMP CIRCULATE HOT SEA WATER - 3 BPM = 90 PSI, WORK UP TO 5 BPM / 200 PSI. - SWS ON LOCATION @ 06:30. - SPOT TRUCKS, CONTINUE TO CIRCULATE HOT SEAWATER. 09:30 - 10:00 0.50 CASING P DECOMP CONDUCT PRE JOB MEETING W/ ALL PARTIES. - DISCUSS USING GOOD COMMUNICATION, SHUTTING DOWN THE JOB. - IMPORTANCE OF WATCHING PRESSURES AND RATES W/ PUMPING. 10:00 - 10:30 0.50 CASING P DECOMP LINE UP, PUMP 5 BBLS FRESH WATER W/ SWS. - CLOSE ANNULAR PREVENTOR, O/A OPEN TO SLOP TANK. - PRESSURE TEST LINES, 500 / 3000 PSI, 5 MIN EACH. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 59 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM I Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 12:00 1.50 CASING P DECOMP 1 SWS PI IMPINn CFMFNT F)OWN q 5 /11" CASING, TAKING RETURNS UP O/A TO SLOP TANK. - PUMPING CEMENT @ 5 - 6 BPM / 400 - 100 PSI AS CEMENT FILLS 9 5/8" CSG. - W/ 150 BBLS CMT AWAY, SLOW TO 3 BPM ADDING 15# / BBL AGGREGATE. - HOLD 400 - 500 PSI BACK PRESSURE ON O/A LINE WHILE PUMPING CMT. - DROP PLUG, CHASE W/ 10 BBLS FRESH WATER, (SWS). - DISPLACE W/ RIG PUMP PUMPING SEAWATER. - W/ 50 BBLS DISPLACED, OPEN O/A HOLDING NO BACK PRESSURE. - ICP = 340 PSI @ 6 BPM, FCP = 1480 PSI @ 6BPM. - SAW GOOD CEMENT @ SLOP TANK W/ 110 BBLS DISPLACED BY RIG. - CLOSED IN O/A HOLDING 200 - 250 PSI BACK PRESSURE. - SLOW PUMP DOWN TO 3 BPM / 1210 PSI FOR LAST 10 BBLS. - BUMPED PLUG W/ 161 BBLS PUMPED BLED OFF ALL PRESSURE, CHECKED 1 FLOATS, FLOATS HOLDING. - CIP @ 12 NOON. OPEN ANNULAR PREVENTOR AND SLACK OFF 1', LOCATION OUT ON 9 5/8" COLLAR. 12:00 - 13:30 1.50 CASING P DECOMP BLOW DOWN ALL LINES, WASH UP & RID SWS. - BREAK OFF AND LAY DOWN CEMENTING HEAD. - FLUSH STACK AND O/A VALVE TO SLOP TANK. 13:30 - 14:00 0.50 CASING P DECOMP PJSM ON NIPPLING DOWN TO SET EMERGENCY SLIPS. - ALSO CONDUCTED AAR ON CEMENT JOB. - DISCUSS IMPORTANCE OF GOOD COMMUNICATION. 14:00 - 17:00 3.00 CASING P DECOMP N/D STACK TO SET EMERGENCY SLIPS. - CENTER UP 95/8" CASING IN SPOOL. - OBSERVE TOP OF CEMENT APPROXIMATELY 5" BELOW O/A VALVE AND STATIC. - INSTALL EMERGENCY SLIPS AND SLACK OFF APPROXIMATELY 25K ON SLIPS, (ALL WE HAD). - MAKE CUT ON 95/8" CASING W/ WACHS CUTTER. 17:00 - 18:00 1.00 BOPSUR P DECOMP PJSM, N/U BOP STACK - INSTALL RISER AND TURNBUCKLES 18:00 - 19:00 1.00 BOPSUR P DECOMP TEST CASING SPOOL - 250 PSI LOW 5 MINUTES, 3500 PSI HIGH 30 MINUTES - GOOD TEST FMC CHART Printed 5/14/2012 11:14:20AM North America ALASKA "- BP Page 80 of e9 " Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 19:00 - 21:00 2.00 BOPSUR P (ft) DECOMP CONTINUE N/U BOP STACK - M/U STACK WASHER AND WASH OUT BOP STACK - R/D LONG BALES, R/U SHORT BALES AND PIPE ELEVATORS - RIG UP AND TEST CIRCULATING LINES ON , OOA AND 000A 21:00 - 22:00 1.00 CASING P DECOMP CIRCULATE 110 DEGREE 8.5 PPG SEA 'WATER DOWN OOA, TAKING RETURNS OUT 000A TO PITS - 5 BPM = 260 PSI - RETURNS TEMP = 50 DEGREES AT START, INCREASED TO 93 DEGREES 22:00 - 23:00 1.00 CASING P DECOMP PJSM ON CEMENTING OPERATIONS WITH ALL PERSONAL INVOLVED I- BLOW DOWN CIRCULATING LINES AND RIG � UP TO CEMENTERS 23:00 - 00:00 1.00 CASING P DECOMP j PRESSURE TEST LINES FROM CEMENT TRUCK TO CUTTINGS TANK - 250 PSI, LOW, 2000 PSI HIGH, 5 MINUTES EACH - BLEED OFF AND OPEN VALVES TO OOA, _ ! ( TAKING RETURNS OUT 000A TO SLOP TANK ti 4/21/2012 00:00 - 01:30 1.50 CASING P DECOMP SCHLUMBERGER BEGIN PUMPING CEMENT PUMP 15.8 PPG CLASS "G" CEMENT DOWN " 3� 100A, TAKING RETURNS OUT 000A TO SLOP �� TANK - FULL RETURNS AT SLOP TANK - AT 160 BBLS OF CEMENT PUMPED, STARTED GETTING CEMENT RETURNS AT SLOP TANK CALLED TOWN ENGINEER AND DISCUSSED POSSIBILITY OF CHANNELING - DECIDE TO CONTINUE PUMPING IF ABLE TO HANDLE RETURNS - PUMPED AN ADDITIONAL 73 BBLS EXCESS, AT SLOWER RATE - GETTING FULL CEMENT RETURNS AT SLOP TANK - STOP CEMENTING OPERATIONS ICP @ 6.7 BPM = 442 PSI - FCP @5.4 BPM = 868 PSI AT 160 BBLS PUMPED - PUMPED 73 BBLS EXCESS - TOTAL CEMENT PUMPED = 233 BBLS -CIP @01:24 - -- - -- - -- — - 01:30 - 02:30 1.00 CASING P DECOMP i FLUSH OUT AND BLOW DOWN LINES - CLOSE BOTH "IA" VALVES - RIG DOWN SCHLUMBERGER - RIG DOWN LINES IN CELLAR - CLEAN CLEAR CELLAR FLOOR 02:30 - 04:30 2.00 BOPSUR P DECOMP PJSM, CHANGE OUT RAMS - CHANGE TOP PIPE RAMS TO 2 7/8" X 5" VARIABLES 04:30 - 05:30 1.00 BOPSUR P DECOMP RIG UP AND TEST BOP, RAMS - INSTALL TEST PLUG AND 4 " TEST JOINT - R/U TEST EQUIPMENT - TEST PLUG LEAKED, PICK UP NEW TEST — — j PLUG. - Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 61 of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task ! Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 07:00 1.50 BOPSUR P DECOMP PRESSURE TEST 2 7/8" X 5" TOP SET OF PIPE RAMS - 250 / 3500 PSI, 5 MIN EACH / CHARTED, GOOD TEST. H PULL TEST PLUG. 07:00 - 07:30 0.50 CLEAN P DECOMP j PJSM, PICK UP SHOE TRACK MILLING BHA. 07:30 - 11:00 3.50 CLEAN P DECOMP i RIH W/ SHOE TRACK MILLING BHA ON 4" DP. OPEN WELL M N R 1 STABLE. - RIH TO 2221', FILLING PIPE EVERY 10 STANDS. - 88K UP WT, 95K DOWN WT. WASH DOWN TO TOP OF CEMENT. - TAG (HARD CEMENT) @ 2279'. P/U TO 2269'. 11:00 - 13:00 2.00 CLEAN P DECOMP 'CIRCULATE @ 5 BPM/ 130 PSI TO GET 80 DEGREES SEAWATER AROUND. 13:00 - 15:00 2.00 CLEAN P DECOMP PJSM. RIG UP TO TEST 9 5/8" CASING. CLOSE UPPER PIPE RAMS. - FILL LINES, TEST 9 5/8" CASING FROM 2279' TO SURFACE. - TEST 250 PSI, TIGHTEN GLAND NUTS ON LOCK DOWN SCREWS / TBG SPOOL. - TEST 250 PSI 5 MIN / 3500 PSI FOR 30 MINUTES / CHARTED / GOOD TEST. - BLEED OFF ALL PRESSURE, OPEN PIPE I RAMS. 15:00 - 16:00 1.00 CLEAN P DECOMP ESTABLISH PARAMETERS, 83K UP WT, 95K DOWN WT, 93K ROTATING WT. - ACQUIRE SLOW PUMP RATES 2 BPM / 20 PSI, 3 BPM / 60 PSI @ 2279' / SEAWATER. - ROTATE @ 65 RPM, 6 BPM / 190 PSI, MILLING CMT 100 FPH W/ 2K WOB. 1- DRILL ON DOWN TO 2315', CMT HARD NOW, 40 FPH / 8 - 10K WOB. 16:00 - 17:00 1.00 CLEAN N RREP DECOMP LEL ...(COMBUSTIBLE GAS) ALARM WENT OFF IN CELLAR. - RIG EVACUATION WAS CALLED .. ALL HANDS MUSTERED TO SIGN IN TRAILER. - ALL HANDS ACCOUNTED FOR, WELL WAS SECURED. - AIR PACKS DONNED AND DRILLER AND LEAD FLOORHAND SWEPT RIG. - RIG WAS DEEMED SAFE TO RE ENTER. LEL READ 0% AT TIME OF ALARM. - ELECTRICIAN CALLED OUT AND WTL JAMES WILLINGHAM NOTIFIED. - PERMISSION GRANTED TO RESUME OPERATIONS. 17:00 - 20:00 3.00 CLEAN N RREP DECOMP TROUBLE SHOOT LEL ALARM - RIG ELECTRICIAN TESTING SENSORS - REPLACE CONTROL PANEL CIRCUIT - TEST = GOOD _ 20:00 - 20:30 0.50 CLEAN ( P DECOMP CONTINUE TO DRILL CEMENT - DRILL FROM 2315' T/2336' I - 5 BPM = 130 PSI, 60 RPM = 2K TQ, WOB= 3K Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 62 of 8 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 00:00 3.50 CLEAN N RREP DECOMP H2S GAS ALARM WENT OFF IN THE CELLAR, PANEL READING WAS STABLE AT "0" - RIG EVACUATION TO SAFE BRIEFING AREA WAS EXECUTED - DRILLER AND #1 FLOORHAND DONNED 1 SCBA'S, SECURED WELL, SWEPT RIG AND i ARRIVED AT MUSTER AREA - A SECOND SWEEP WAS MADE OF THE RIG 1 WITH HAND HELD MONITORS STILL READING " - RIG WAS DEEMED SAFE TO RE -ENTER - RIG ELECTRICIAN AND TOOLPUSHERS TROUBLESHOOT H2S GAS ALARM - H2S GAS SENSOR IN THE CELLAR SHARES I THE SAME "LINE' AS PREVIOUS TROUBLESOME "LEL" SENSOR - DISCUSS WITH CTD / RWO TEAM LEAD THE SITUATION AND PLAN FORWARD 1 - CREATE HAZARD RECOGNITION WORKSHEET FOR PROCEEDING AHEAD - ALL HANDS WILL CONTINUE TO WEAR H2S PERSONAL MONITORS - A HAND WILL BE STATIONED IN THE CELLAR AT ALL TIMES WITH A HAND HELD GAS MONITOR - THE TOOLPUSHER OR DRILLER WILL BE STATIONED IN THE DOG HOUSE AT ALL TIMES TO MONITOR MAIN ALARM PANEL READINGS - THE TOOLPUSHER WILL VERIFY WITH THE CELLAR MONITOR THAT READINGS ARE "0" BEFORE RESETTING ALARM SENSOR - 3 BARRIERS IN PLACE INCLUDE CEMENTED 9 5/8" UNPERFORATED CASING, TESTED CIBP AT 2529' MD, CEMENT PLUG F/2336' T /CIBP @ 2529' - WE WILL NOT MILL UP THE CIBP BEFORE ALL ALARMS ARE WORKING PROPERLY - PERMISSION GRANTED TO RESUME MILLING OPERATIONS BY OPS SUPERINTENDENT 4/22/2012 1 00:00 - 07:00 7.00 CLEAN P DECOMP CONTINUE MILL CEMENT / CLEAN OUT 9 5/8" CAGING nnvl(NLTn CIBP - MILL F/ 2336' - MILL UP CEMENT WIPER PLUG AND FLOAT SHOE - PUWT = 83K, SOWT = 95K, ROTW = 93K - 5 BPM = 130 PSI, 60 -80 RPM = 2K TQ, WOB = 3 -8K - PUMP HI VIS SWEEPS AS NEEDED - MILL TO 2525'. CIRCULATE SWEEP AROUND. - MONITOR WELL, WELL STABLE. 07:00 - 07:30 0.50 CLEAN P DECOMP PJSM. POOH TO 2312'. (3) STANDS. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP a 63 of 89 Operation Sum Rep Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3- 001LM -E: (3,000,000.00 ) f _ Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 ©48.40ft (above Mean Sea Level) Date From - To Hrs j Task Code NPT 7 NPT Depth Phase Description of Operations (hr) (ft) L 07:30 - 09:00 1.50 CLEAN P j DECOMP PJSM. RIG UP TO TEST 9 5/8" CASING TO 2525'. - PRESSURE TEST CASING @ 400 PSI / 5 MIN / OK. - STAGE UP PRESSURE TO 1000 PSI, BLED OFF TO 650 PSI IN (2) MINUTES. - REPEAT WITH SAME RESULTS. ESTABLISH INJECTION RATE OF 2 BPM / 1000 PSI. - REPORT RESULTS TO TOWN ENGINEER. 09:00 - 11:00 2.00 CLEAN P DECOMP PJSM. MONITOR WELL, WELL STABLE (10 MINUTES). I- POOH W/ SHOE TRACK MILLING BHA ON 4" I f ; DP. I- MONITOR WELL AT BHA, 10 MINUTES, WELL _ I _ STABLE. _ 11:00 - 12:00 1.00 CLEAN P i DECOMP ! PJSM. LD /BHA. ' - RECOVERED (4) GALLLONS CEMENT IN ■ JUNK SUBS. - CREW COMING ON ARRIVES EARLY AND HAS WEEKLY SAFETY MEETING. - DISCUSSED CONTROL OF WORK AND USE 1 OF ESCAPE PACKS. ALSO RECENT INCIDENTS, IMMEDIATE _ HAZARDS AND STOP CARDS. 12:00 - 16:00 4.00 CLEAN P DECOMP CLEAR / CLEAN RIG FLOOR. - C/O SWAB ON MUD PUMP & COMPLETE WORK ORDERS. 16:00 - 17:30 1.50 CLEAN P DECOMP PJSM. MAKE UP MULE SHOE FOR CEMENT SQUEEZE OPERATION. OPEN WELL, FLOW CHECK, WELL STABLE. - RIH W/ MULE SHOE AND 4" DP to 2501' MD - PUWT = 75K, SOWT = 80K SPR, 2 BPM = 30 PSI, 3 BPM = 50 PSI 17:30 - 18:30 1.00 CLEAN P DECOMP CIRCULATE 120 DEGREE SEA WATER UNTIL 80+ DEGREE RETURNS - 6 BPM = 170 PSI 18:30 - 19:30 1.00 CASING P DECOMP PJSM WITH SCHLUMBERGER FOR CEMENT SQUEEZE - BLOW DOWN TOP DRIVE - R/U CEMENT LINES Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 64 61 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 1Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM i Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations 19:30 - 00:00 4.50 j CASING P (ft) DECOMP CEMENT SQUEEZE IN 9 5/8" CASING 250 PSI LOW, 2700 PSI HIGH, 5 MINUTES EACH = GOOD TEST PUMP 10 BBLS WATER, TEST LINES BEGIN PUMPING AT 22:10, SET UP TIME WILL BE 2:19 AM ON 4/23/12 ,- PUMP 70 BBLS 15.8 PPG CLASS "G" TAIL 'CEMENT, 5 BPM = 850 PSI I- 15# / BBL OF AGGREGATE ADDED TO CEMENT. j- FOLLOW WITH 2.5 BBLS FRESH WATER i- DISPLACE WITH RIG, 11 BBLS SEA WATER - VERIFY THAT PIPE IS ON VACUUM = GOOD R/D CEMENT LINE AND HEAD PIN !- POOH 3 MINUTES PER STAND, F/2501' T/1426' MD, (11 STANDS PLUS 1 JOINT) R/U CEMENT LINE AND HEAD PIN CLOSE ANNULAR AND REVERSE j CIRCULATE 1 PIPE VOLUME R/D CEMENT LINE AND HEAD PIN, OPEN !ANNULAR { M/U TOP DRIVE FOR WEIGHT I CONSIDERATIONS, CLOSE ANNULAR 4/23/2012 00:00 - 03:00 3.00 CASING P DECOMP ! SQUEEZE CEMENT OUT 9 5/8" CUTS PUMP DOWN PIPE AND KILL LINE WITH !ANNULAR CLOSED 1- SQUEEZE 30 BBLS OF CEMENT OUT CUT AT 1 BPM = 890 PSI, (RATE PSI BROKE OVER = 1150 PSI) HOLD PRESSURE ON FOR 20 MINUTES, PRESSURE HELD CONSTANT AT 670 PSI - SQUEEZE 10 BBLS, 1 BPM = 960 PSI - HOLD FOR 20 MINUTES, PRESSURE HELD AT 830 PSI - SQUEEZE 10 BBLS, 1 BPM = 1040 PSI - HOLD FOR 20 MINUTES, PRESSURE HELD AT 760 PSI - SQUEEZE 2 BBLS, 1 BPM = 970 PSI - HOLD FOR 30 MINUTES, PRESSURE HELD AT 760 PSI - AT 2:30 AM, (WHICH WAS PAST THICKENING TIME AT 2:19), SQUEEZE 3 BBLS,1 BPM = 1020 - HOLD FOR 30 MINUTES, PRESSURE HELD AT 860 PSI - TOTAL AMOUNT SQUEEZED = 55 BBLS 03:00 - 08:00 5.00 CASING P DECOMP ATTEMPT TO BLEED OFF PRESSURE - BLEED 10 BBLS BACK - SHUT BACK IN AND PRESSURE STABILIZED !AT 660 PSI, THEN DECREASED TO 580 PSI OVER1HOUR r- HELD 700 PSI BACK PRESSURE WHILE I CIRCULATING THROUGH CHOKE TO KEEP TOP DRIVE FROM FREEZING - PRESSURE UP TO 1150 PSI @ 05:00, HOLD FOR (1) HOUR, BLED OFF 75 PSI. - PRESSURED UP TO 1425 PSI © 06:00, HELD FOR (2) HOURS, BLED OFF 75 PSI. Printed 5/14/2012 11:14:20AM North America - ALASKA - BP Page 65 of • Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 1 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) _ I _ Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) � (ft) 08:00 - 09:00 1.00 j CASING P DECOMP BLEED OFF ALL PRESSURE SLOWLY, 2.4 BBLS BACK TO TRIP TANK. OPEN WELL, MONITOR, WELL STATIC. (15 i i MINUTES). - BLOW DOWN TOP DRIVE, CHOKE AND KILL LINES. 109:00 - 10:00 1.00 CASING P DECOMP PJSM. POOH. - STAND BACK 4" DP, LAY DOWN MULE SHOE. 10:00 - 10:30 0.50 CASING P j DECOMP PJSM ON MAKING UP BHA AND TRIPPING DRILL PIPE. 10:30 - 12:00 1.50 CASING P DECOMP PICK UP CEMENT / BRIDGE PLUG MILLING BHA. - RU-1 TO 419'. MONITOR WELL, WELL STABLE. 12:00 - 13:30 1.50 CASING P DECOMP PJSM. CONTINUE TO RIH W/ MILLING BHA. - RIH TO 2126'. 75K UP WT, 85K DOWN WT. ACQUIRE SLOW PUMP RATES. 2 BPM / 30 PSI, 3 BPM / 50 PSI. 13:30 - 00:00 10.50 CASING P DECOMP 1 PJSM. CIRCULATE HEATED SEAWATER AROUND. - CIRCULATING @ 3 BPM / 50 PSI. CALLED CEMENT LAB, @ 22 1/2 HOURS 'COMPRESSIVE STRENGTH IS 539 PSI. I- HOLD TRAINING WITH RIG CREW ON "EMERGENCY LOWERING PROCEDURE FOR MAN RIDER - WORK ON "MP2" WORK ORDERS - INSTALL ELECTRIC MOTOR ON STABBING BOARD - RIG MAINTENANCE 4/24/2012 00:00 - 01:00 % 1.00 CLEAN P DECOMP NOTIFIED BY SCHLUMBERGER THAT COMPRESSIVE STRENGTH HAD REACHED 1000 PSI UCA - HOLD PJSM WITH ARRIVING CREW 1 - REVIEWED DETAILED SOPS FOR UPCOMING OPERATIONS - READ THROUGH AND DISCUSSED SOPS AND ASSOCIATED HAZARDS FOR: -- BRIDGING DOCUMENTS -- TOP DRIVE CONNECTIONS -- MILLING OPERATIONS -- FLUID MONITORING_ 01:00 - 06:00 1 5.00 CLEAN P DECOMP , MILL CEMENT 1 SPR'S, 30 SPM = 30 PSI, 40 SPM = 50 PSI - PUWT = 85K, SOWT = 93K, ROTW = 90K, 60 RPM = 1.5KTQ - 7.5 BPM = 260 PSI, WOB = 5 -7K - WASH DOWN AND TAG STRINGS AT 2178' MD - TAG HARD CEMENT AT 2195' MD - MILL CEMENT F/ 2195' T/ 2305' 06:00 - 10:00 4.00 CLEAN P DECOMP CONTINUE TO DRILL CEMENT. - 6 BPM / 200 PSI. WOB 5 - 7K, ROP 30 FPH. - 85K UP WT, 93K DOWN WT, 90K ROTATING WT. - DRILL TO 2525, (4' ABOVE BRIDGE PLUG). 10:00 - 11:30 1.50 CLEAN P DECOMP PJSM. CIRCULATE SWEEP AROUND. - 80 DEGREE SEAWATER @ SURFACE - MONITOR WELL FOR 10 MINUTES - CONDUCT CROWN INSPECTION__ 11:30 - 12:00 0.50 CLEAN P DECOMP BLOW DOWN TOP DRIVE 1- POOH FROM 2525' TO 2315 _ Printed 5/14/2012 11:14:20AM North America - ALASKA - BP 4 1 0 Page of 69 Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) - 12:00 - 16:00 4.00 CLEAN P DECOMP PJSM - R/U AND TEST 95/8" CASING - 250PSI 5 MINUTES, 1000PSI 10 MINUTES, 11700PSI 30 MINUTES - CHARTED I- R/D TEST EQUIPMENT - BLOW DOWN ALL SURFACE LINES - CLEAN MUD PUMPS SCREENS 16:00 - 17:30 1.50 CLEAN P DECOMP PJSM M/U SPR'S 30 SPM=80 PSI, 85K UWT, 93K DWT, 95K RWT - DRILL CEMENT FROM 2525' @ 5BPM, 150 PSI, 60RPM, 2.5K TQ WOB - DRILL CIBP VRIFY PLUG FREE - RIH 5' AND P/U - MONITOR WELL - FLUID DROPPED 6" - SHUT IN WELL AND MONITOR - PRESSURE 0 PSI ON CASING AND DRILL PIPE RIG VISIT BY GREG MATTSON AND JEFF KILFOYLE AND TEAM. 17:30 - 19:00 1.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP THROUGH GAS BUSTER - 1 BPM =20 PSI - 2 BPM= 40PSI - 3 BPM= 70PSI - 4BPM= 100 PSI - 5 BPM= 160PSI - REDUCE TO 3 BPM= 70 PSI. - SHUT DOWN PUMP - MONITOR WELL 10 MINUTES - STATIC 19:00 - 21:30 2.50 CLEAN P DECOMP RIH TO 2535' TAG UP - DRILL REAMING AT 5BPM, 150 PSI, 60 RPM 2 -3K TORQUE - 92K UWT,100K DWT,100K RWT - BREAK THROUGH AT 2626' - RIH WITH NO RESISTANCE TO 2695' 21:30 - 22:30 1.00 CLEAN P DECOMP PUMP 20 BBL HI-VIS SWEEP AT 7BPM 230 PSI CEMENT AND RUBBER RETURNS 22:30 - 00:00 1.50 CLEAN P 1 DECOMP ! RIH ON ELEVATORS - CIRC -OUT BOTTOMS UP EVERY 5 STANDS @ 7BPM 403PSI - CHANGE OUT WITH CREW AT 3168' ------------------- - - - - -- 4/25/2012 00:00 - 01:00 1.00 CLEAN P DECOMP PJSM FOR RUNNING IN HOLE WHILE CIRCULATING. _ L _ - CIRCULATED AT 250 GPM 01:00 - 07:00 6.00 CLEAN P DECOMP FLOW CHECK - STATIC - RUN IN HOLE. - BREAK CIRCULATION EVERY 5 STANDS. - TAG UP AT 4,146 -FT MD, SET DOWN 7K, WORK DOWN FREE. - TAKING SLOW PUMP RATES EVERY 5 STANDS. - TO6960' MD 07:00 - 09:00 2.00 CLEAN P j DECOMP WELL OUT OF BALANCE WITH 10.3 PPG OLD MUD -VERY THICK WITH NO STRONG ODER NOTED. - DISPLACE WELL WITH 8.5 PPG SEAWATER -DUMP 400 BBL OLD MUD AND CONTAMINATED MUD SYSTEM. 09:00 - 11:00 2.00 CLEAN P DECOMP WAIT ON SEAWATER TRUCK AND ONE DIRTY TRUCK TO RETURN. - STAGE ONE TRUCK INTO POSITION AT A TIME. Printed 5/14/2012 11:14:20AM North America - ALASKA -* Bp s7 of 69 Operation Summary Report • Common Well Name: PR331213 I AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM E: (3,000,000.00 ) Project: Prudhoe Bay (various) ' Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 12:00 1.00 CLEAN P 1 DECOMP DISPLACE OLD 10.2 PPG MUD AT 6960' MD WITH 8.5 PPQ SEAWATER. - 6 BPM / 550 PSI 12:00 - 14:30 2.50 CLEAN P DECOMP RIH WITH 8.50" MILL OUT ASSEMBLY FROM 6860' TO 7907' MD. - 170K SOW, 168K PUW. - BREAK CIRCULATION 40 SPM / 360 PSI MW IN = 8.5 PPG, MW OUT = 8.7 PPG. 14:30 - 16:00 1.50 CLEAN ID DECOMP I RIH WITH 8.50" MILL OUT ASSEMBLY FROM [7907' TO 8855' MD. - 185K SOW, 170K PUW. - BREAK CIRCULATION 40 SPM / 620 PSI MW OUT = 8.9 PPG, MW IN = 8.7 PPG. 16:00 - 17:00 1.00 CLEAN P DECOMP I P/U 4" DP FROM PIPE SHED AND RIH WITH 8.5" MILL OUT ASSEMBLY - F/ 8855' T/9220' - MAKE UP TOP DRIVE, INSURE BIT NOT PLUGGED - 198K UWT - 170K DWT GAVE AOGCC 24 HOUR NOTICE OF / UPCOMING BOP TEST AT 18:00 HOURS. AT ✓ 18:03 BOB NOBLE WITH AOGCC CALLED BACK AND ASKED TO BE GIVEN A CALL IF WE HAVE NOT COMPLETED LANDING TUBING HANGER BY DEADLINE. 1 17:00 - 20:00 ! 3.00 CLEAN P DECOMP I WAIT FOR TRUCKS ;- CLEAN OUT SLOP TANK AND PITS FOR 1 DISPLACMENT. 20:00 - 22:00 2.00 CLEAN P DECOMP 1 PUMP 15 BBL HI-VIS SWEEP - DISPLACE WELL WITH 8.5 PPG SEAWATER AT 7BPM, 1200PSI, 5 BPM 560PSI - 6ORPM, RECIPROCATE 65' - FINAL WEIGHT 8.7 PPG WITH A 31 VISCOSITY 22:00 - 22:30 0.50 CLEAN P DECOMP MONITOR WELL FOR 10 MINUTES - WELL IS STATIC - BLOW DOWN TOP DRIVE 22:30 - 00:00 1.50 CLEAN P DECOMP PULL OUT OF HOLE FROM 9220' - LAY DOWN DRILL PIPE 1X1 TO PIPE SHED - 195K UWT, 190K DINT - STOP AT 8571' FOR CHANGE OUT 4/26/2012 00:00 - 07:00 7.00 CLEAN ID DECOMP PJSM - CONTINUE PULLING OUT OF HOLE FROM 8571' to 2505' MD WHILE LAYING DOWN DRILL PIPE - CLEAN SLOP TANK WITH SUPER SUCKERS 1 - CLEAN PITS 07:00 - 08:30 1.50 CLEAN ID DECOMP R/U AND CIRCULATE AT 2505' MD - 3 BPM / 130 PSI - SPOT HOT OIL TRUCKS - R/U HOT OIL LINES. 08:30 - 09:30 1.00 CLEAN P DECOMP PJSM. TEST HOT OIL LINE - 500 AND 1000 PSI, PASSED. 09:30 - 12:30 3.00 CLEAN P DECOMP SUBMIT DIESEL DISPLACEMENT 1 PROCEDURE TO DDI SUPERINTENDENT FOR APPROVAL. Printed 5/14/2012 11:14:20AM Page of 69 North. America - ALASKA - BP Operation Summary Report Common Well Name: PR331213 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code ; NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 15:00 2.50 CLEAN P DECOMP PJSM. DISPLACE 8.6# SEAWATER WITH DIESEL. - HOT OIL PUMPED 160 BBLS DIESEL - 5 BPM! 700 PSI. - HOTOILVACUUMBACKLINE. - U -TUBE DIESEL. - WELL STATIC. 15:00 - 18:30 3.50 CLEAN P DECOMP POOH FROM 2505' - LAY DOWN DP 1X1 TO BHA - MONITOR WELL 10 MINUTES = STATIC 18:30 - 20:00 1.50 CLEAN P DECOMP L/D BHA - UD 6 1/4 COLLARS - UD BAKER BHA = JARS, BOOT BASKETS, MILL - 5 PIECES OF METAL DEBRIS AND 1 GAL OF CEMENT IN BOOT BASKETS 20:00 - 21:30 1.50 CLEAN P DECOMP INSTALL TUBING HANGER AND TWC 1- RUN IN LOCK DOWN SCREWS TEST TWC FROM BELOW TO 1000 PSI 10 j MINUTES, CHARTED, GOOD TEST AT 21:30 I I HOURS 21:30 - 23:00 1.50 CLEAN P ; DECOMP j RIG DOWN CELLAR BLOW DOWN LINES RU AND FLUSH STACK 23:00 - 00:00 1.00 CLEAN P DECOMP IUD STACK WASHER - CLEAR RIG FLOOR OF BAKER TOOLS BLOW DOWN TOP DRIVE — — _CLEAN RIG FLOOR 4/27/2012 00:00 - 01:00 1.00 1 CLEAN P DECOMP 1 CONTINUE CLEAR CLEAN RIG FLOOR - SUCK OUT STACK 1- BLOW DOWN CHOKE AND KILL LINES 1- BLOW DOWN CHOKE MANIFOLD 01:00 - 06:00 5.00 BOPSUR P DECOMP PJSM, CHANGE PIPE RAMS IN BOP - CHANGE LOWER PIPE RAMS TO 2 7/8" X 5" OPEN BLIND RAM DOORS AND UPPER PIPE RAM DOORS, INSPECT AND CLEAN. 1- N/D AND SET BOP BACK ON STAND 06:00 - 10:00 4.00 WHSUR P DECOMP 1PJSM, CLEAN OFF TBG HANGER AND WELL HEAD. 1- N/U 13 3/8" ADAPTOR FLANGE AND 7 1/16" DRY HOLE TREE. - HELD RIG LEADERSHIP MEETING WITH CT / 1 RWO SUPERINTENDENT GREG SARBER ON MPL -06 RETURN TO WORK, BOTH DDI TOOLPUSHERS, DDI DRILLING !SUPERINTENDENT, AND BOTH WSL'S ATTENDED 10:00 - 11:00 1.00 WHSUR P DECOMP 1 FMC REP FILL TBG HANGER VOID /SEALS AND TEST TO 5000 PSI FOR 30 MINUTES. 11:00 - 12:00 1.00 WHSUR P DECOMP FILL TREE WITH DIESEL UNABLE TO TEST TREE, TWC LEAKING. CALL OUT FMC TO CHANGE OUT TWC. Printed 5/14/2012 11:14:20AM North America : ALASKA BP 0, Page 69 of 69 Operation Summary Report Common Well Name: PR331213 1 AFE No Event Type: PLUG AND ABANDON (PXA) Start Date: 3/19/2012 End Date: 4/27/2012 4Z3 -001 LM -E: (3,000,000.00 ) Project: Prudhoe Bay (various) Site: EX PR331213 Rig Name /No.: DOYON 16 Spud Date/Time: 3/25/2012 12:00:OOAM Rig Release: 4/27/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: 1 : PR 10/31/1969 00:00 @48.40ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 14:30 2.50 WHSUR P DECOMP WAIT ON FMC LUBRICATOR AND TWC. - DSM CREW WORKING AT DOYON RIG 14. - MOVE WSL OFFICE TO MPL -PAD. - MOVE MISC. LOADS OFF THE ICE PAD AND STAGE AT PRICE PAD. j ! - INVITE ENVIRONMENTAL REP FOR ICE PAD VISIT AT 07:00 HRS 4 -28 -2012. 14:30 - 19:00 4.50 WHSUR P DECOMP PJSM, R/U FMC LUBRICATOR - TEST 500 PSI LOW, AND 3500 PSI HI FOR 5 MINUTES. PULL 6" TYPE 'J" TWC - INSTALL 6" TYPE 'J' TWC - TEST TWC FROM BELOW, 1000 PSI 10 MINUTES, CHARTED, TESTED GOOD. - TEST TREE 250 PSI LOW, 5000 PSI HIGH, 5 MINUTES, CHARTED, TESTED GOOD 19:00 - 19:30 0.50 WHSUR P DECOMP RIG DOWN FMC LUBRICATOR - BLOWDOWNALLLINES - R/D CELLAR LINES - R/D CLEAR / CLEAN CELLAR FLOOR 19:30 - 21:00 1.50 RIGD P DECOMP PJSM ON PREPARING RIG FOR RDMO - BLOW DOWN MUD PUMP AND SURFACE LINES - COMPLETE CLEANING PITS AND CUTTINGS TANK - BRIDAL UP BLOCKS, SECURE DERRICK FOR LAYING OVER I i � - RELEASE RIG AT 21:00 HOURS, FOR MOVE TO MPL -06. _ Printed 5/14/2012 11:14:19AM • • PR331213, Well History (Post Rig Work) Date Summary 04/30/12 T /I /O =0/0/0 Conducted PJSM. With tubing pressure of 0, Shut Master & Swab (dry hole tree) and pressure tested down against Swab 3500 psi /5 min. Pass. Removed tree cap, attached Quick Test Sub, and lubricator w/ pulling tool. Pressure tested 250 /Iow..3500 /high.. Pass. PULLED 6 3/8" CIW "J" TWC #422 using 0 ext. Tagged @ 116" Shut valves, removed lubricator. Attached tree cap, P.T.d to 500 psi. Pass. note: Quick Test Sub was used to clear Swab valve. 05/01/12 IA/OA/OOA/000A= 0/0/0/0 Temp =S /I MIT -IA to 2500 PASSED (P &A) Pumped 5.9 bbls AMB diesel to test. 1st 15 min IAP lost 109 & 2nd 15 min IAP lost 22 for a total IAP loss of 131 in 30 min. Bled back - 5 bbls. FWHP's= 0/0/0/0 DSO notified upon departure IAV,OAV,00AV =OTG Tags hung. 05/02/12 CTU 8 w/ 1.75" CT. Scope; P &A. RIH. Tagged @ 9226', corrected depth to 9220'. PU 50', painted flag. n // Circulated 100 bbls of 1% KCI to establish 1:1 returns. Lay in 528.5 bbl of 15.8# class G cement from flag to 2000'. ERD- Well control, coil pinhole. PJSM. Lay in cement form 2000 ft to surface. 150 bbl AS1, 15.8 ppg cement. 105 bbl cement pumped at midnight. 05/03/12 Continued from WSR of 05- 02 -12. CTU 8, 1.75" coil. Job Scope: Plug and abandon well with cement from PBTD to surface. Continue laving in AS1 cement from 2000' to surface. 150 bbl AS1, 15.8 ppg cement. Good cement seen at surface when nozzle was close to surface. Dress off cement at ground level. Jet stack and tree with Biozan using side jet nozzle. Freeze protect coil, tree and surface lines with 60/40 meth. PT tree cap. Check chains and change out packoff. Rig down CTU. 05/04/12 I /O /OO /000= Vac /0/0/0. Temp =SI. Pressure Test to 2500 psi. PASSED. PT cement top of 9 5/8 casing. (P &A). IA has integral installed. Pumped approx 2 bbl of diesel to pressure test 9 5/8" casing to 2500 psi. Lost 243 psi in 15 min. Strapped cement top CO 48' from top of TBG hanger. AOGCC witnessed by John Crisp. Final WHP's = 0/0/0/0. SW, MV =C. IA =OTG. OA = ? ?. NOVP @ 16:15. 05/06/12 T /I /O /OO /000 = 0/0 /vac /0/0 Temp = SI. Bleed WHPs to 0 psi (P &A). No need to bleed. SV = C. IA, OA, OOA, 000A = OTG. NOVP. 1215. 05/08/12 T /I /O /OO /000 = 0/0/0/0/0. Temp = SI. WHPs (Replace Jewelry on Tree). No sign of leak, fluid or pressure. Could not reach valves to verify valve positions. 11:30 05/14/12 Cut tree off and sent tree back to API shop. • 05/15/12 npmpnt tnp jnh FillMrt wellhnrp with 4 bhls of 15.8 # of AS1. Weld to plate on conductor. , Page 1 of 1 AI 4 IF ! ♦ v ♦ �' ►r1 t f • i► k . �, ,4' .rte, r t.. i t . • ;E +� ',, k t i ` t ' ) --, +y , .{ fi - r' .. 1( i' a 1 i 4 "i:4-i...: # i s f 1' j 4 1 rf T r r F i r r a .f! a YF s 4 4yyw� } y e a "it �: n 1 .tt ` , it 5 4 �° a *' , q 44* . f "� , , Y' 'w .,i. t a b -- ' b i`€ B# £ .,. c•� } 4..�. " , §a 's ''''gi € -8.° }` . u . _ I t i �- a t ` iii . t , ' ♦ '. .'.t • Y pp 1. • 3 l' N ''' ."-' 4 , I ,, t ii ..-- itt ., .. ,, ., . .. , ,,.. . : w . , ....... ,. , ., , .,. ' - , „ . ' : . . - .,. .- - .IIIK Iry (:, _ : . , • .„. ' } a „ p . . . . a) " ' 1.- ti ° ` Y, i 17 I t TJ +7i, [ 7, t . oil ' IN iftiii, , , , .... . ; : . VI - N 4, , , , 4 1 , ,, t i ilk 1 ' ' ' ! , _ ` . fir, r- x ;; ' X * .. : ' - 4 ,r 4' • m M 11 '4 R • r Proposed P&A Status • Put River 33 -12 -13 API 50- 029 -20047 PTD 169 -104 30" shoe @ 91' MD • 16" casing @ 2,095' MD -� _ 9 5/8" casing cemented to surface 13 -3/8" DV @ 2,145' MD 20" shoe @ 2,195' MD Muleshoe /cementing ports @ Port Collar @ 2200' MD -2400' MD 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD TOC calculated @ 6,088' MD Cement Mud ,_ , 9 -5/8" Float @ 9,237' MD • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg 2d 6.1V31(-2.-, DATE: May 02, 2012 P. I. Supervisor I \ �� FROM: John Crisp, SUBJECT: Abandonment Plug Test Petroleum Inspector PBU TR PR 323 -12 -13 BPXA PTD 1691040 May 02, 2012: I traveled to BP Exploration (Alaska), Inc. Put River 33 -12 -13 to witness a pressure test of surface plug & thru tree surface cement tag (Sundry 312 -036) Pump was R/U on the tree when I arrived on location. Several attempts to PT were made before the successful pressure test was accepted by BPXA (2500 psi test that lost 243 psi in 15 minutes). A 50 -ft strapping tape was lowered thru tree to verify TOC without success. String with weight attached was lowered to 58' to find TOC. BPX will evaluate PT & TOC to determine plan forward. Summary: I witnessed pressure test on surface cement plug that meets BPXA criteria for passing pressure test. TOC was then found @ 58' from top of tree. Attachments: 4Photos Non - Confidential kANNED JUN .► . aO P &A Put River 33 -12 -13 05 -04 -12 Page 1 of 3 • • Plug Verification Test — PBU TR PR 33 -12 -13 (BPXA) PTD 1691040 Photos by AOGCC Inspector J. Crisp May 2, 2012 ill i ,,► I I 1 iLk, i 1111 — r e ;. . 1111' ■ 'III' - _. I Production Tree; , , i r � l �� 1 ' hardline rigged up for I / 110 �� pressure testing 411 1 wili 1 1 a iii il• , pop fir' __ t — tat i U P Pump, generator, bleed .� : a : P, g trailer, tanks supporting IF r i-., i rs P &A work _ ►I "f may."' P &A Put River 33 -12 -13 05 -04 -12 Page 2 of 3 , • • I' Q _ ti I . fL ,, - ' ' i ,' ..-., 't I Bleed trailer; tanks in background may _, ` — - P ° ' . tot , tom ` t 11111 .-- Checking depth of ## surface cement 1 r ,. MOM ,� , _ P &A Put River 33 -12 -13 05 -04 -12 Page 3 of 3 Page l of 1 • • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) D /6,7- t' o tq Sent: Tuesday, April 24, 2012 11:51 AM To: 'Worthington, Aras J' Subject: RE: Put River 33 -12 -13 P &A Sundry #312 -036 Aras, This is acceptable...your modification fulfills the original intent to fill the well with cement from TD to surface. Chart the 9 5/8" casing pressure test (2500 psi ) before you begin to lay in the cement plug from the bottom at 9200' md. If it doesn't hold pressure you will have to break up the cement plugs into two parts and get a passing PT after the first plug to 6000' as per the original procedure. Call me if you have any questions. Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) �� 444 -3433 (cell) MAY 2 1 From Worthington, Aras 3 [ mailto:Aras.Worthington ©bp.com] Sent: Tuesday, April 24, 2012 11:22 AM To: Schwartz, Guy L (DOA) Subject: Put River 33 -12 -13 P&A Sundry #312 -036 Guy, I'd like to propose a slight change of plans for the P &A on Put River. Just to update where we are on the well: The Workover rig finished cutting and pulling the 10 -3/4" casing and ran new 9 -5/8" casing and cemented that string to surface (13 -3/8" x 9 -5/8" annulus cemented to surface from —2500' MD). As well the workover rig has completed cementing of the curtain string (originally this step was in the post -rig step #5 but we went ahead and did it on -rig). Currently the workover rig is drilling out the cement above the 9 -5/8" CIBP @ 2523' MD and then they will drill out the CIBP, CO to TD and Swap the well to seawater then RDMO. Point forward we have all annuli in the well cemented so all that is left is to cement the 9 -5/8" casing. We propose to do this by laying a solid cement plug from TD to surface (provided the PT of the wellbore will hold a full column of cement. If not, we will have to break the plug up as originally proposed in the Sundry). We will use Class G for depths below 2000' MD and Arcticset I or the permafrost blend of Class G for the depths above 2000' MD. Obviously if we do the job this way there won't be the opportunity for the AOGCC to witness and tag and PT of the plug @ 6000' MD but AOGCC could witness tag and PT of the continuous plug at surface. Please advise if this is an acceptable change of course. Aras Worthington Wells Intervention Engineer BP Alaska Inc. Office: (907) 564 -4102 Cell: (907) 440 -7692 4/24/2012 Page 1 of 1 • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Wednesday, March 28, 2012 2:22 PM To: 'Worthington, Aras J' Cc: Bjork, David; DOA AOGCC Prudhoe Bay /' ? Subject: RE: Put River 33 -12 -13 P &A (� � Aras, The proposed change to the P & A is approved. Cementing from approx 2500' and meets all regulatory requirements. (It appears though that the 9 5/8" port collar ( diverter?) you are proposing to circulate through will be at 2200' md.) Regardless, cement from 2200' to surface in the 9 5/8" x 13 3/8" annulus is fine. The rest of the procedure remains the same as you mention below. - • Regards, Guy Schwartz Senior Petroleum Engineer _ M �, ���� AOGCC , � 'AMA v c9,� 793 -1226 (office) 444 -3433 (cell) From: Worthington, Aras J [mailto:Aras.Worthington @bp.com] Sent: Wednesday, March 28, 2012 11:14 AM To: Schwartz, Guy L (DOA) Cc: Bjork, David Subject: Put River 33 -12 -13 P&A Guy, We are considering the option of completing this P &A with the Workover Rig rather than leaving the pumping of cement for post -rig operations (CT, etc.) The only change that this would result in with regards to what is proposed in the Approved Sundry is that the final plug in the 13 -3/8" x 9 -5/8" annulus would be from -2500' MD to surface, rather than the originally proposed 3000' MD to surface. Reference Steps #3 and #4 in the post -rig procedure. These steps would be performed on -rig with the cement circulated through the diverter installed in the new 9 -5/8" casing @ -2500' MD. Would you approve this change in the depth of the final cement plug? I've attached the original Sundry for reference. Thanks, Aras Worthington Wells Intervention Engineer BP Alaska Inc. Office: (907) 564 -4102 Cell: (907) 440 -7692 3/28/2012 Page 1 of 2 • . Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Wednesday, February 01, 2012 11:39 AM To: 'McAnulty, Michael C' Cc: Worthington, Aras J; Price, Jerel E (Moody international)); Regg, James B (DOA) Subject: RE: PR33 -12 -13 (PTD 169 -104) Status (Surface Remediation) Michael, Thank you for the update. It appears that once the well is P & A'd this winter and wellhead is cut off below grade that a site inspection would be appropriate this summer. (2012) Regards, Guy Schwartz Senior Petroleum Engineer > AOGCC t N� FEB '' 3 793 -1226 (office) 444 -3433 (cell) From: McAnulty, Michael C [mailto:mcanumc ©bp.com] Sent: Wednesday, February 01, 2012 11:11 AM To: Schwartz, Guy L (DOA) Cc: Worthington, Aras 3; Price, Jerel E (Moody international)) Subject: PR33 -12 -13 (PTD 169 -104) Status (Surface Remediation) Per your January 31, e-mail to Aras Worthington regarding the subject exploration well site, below is a summary of the surface remediation work conducted at the site in Spring 2011. Please let me know if you have any further questions. • Reserve pit waste excavated and pit backfilled. Approximately 5,432 loose cubic yards (LCYs) of Class II, Resource Conservation and Recovery Act, exploration- and - production- exempt drilling waste and petroleum hydrocarbon- impacted material were excavated from the reserve pit and flare pit areas and hauled to the grind and inject facility at Drill Site 4 in the Eastern Operating Area of the Prudhoe Bay Unit for down -hole disposal in a Class 1 injection well. The reserve pit and flare pit were backfilled with gravel, which was then capped with approximately 2,380 LCYs of organic - rich overburden • Gravel pad removed to tundra grade. Approximately 10,400 LCYs of impacted gravel and tundra were excavated from the gravel drill -pad area, as well as tundra areas adjacent to the northern margin of the pad. This material was hauled to the East Dock Landfarm (EDLF) for treatment and eventual re -use. Approximately 16,000 LCYs of clean gravel were excavated from the gravel drill - pad, as well as the west pit and reserve pit containment berms. An estimated 1,800 LCYs of this clean gravel was used on -site as backfill. The remaining gravel was staged at the Dead Arm Pit for eventual reuse. • Sample results document cleanup levels achieved. Confirmation sample results for the reserve pit, flare pit, and impacted areas of the gravel pad document that target cleanup levels were achieved. Backfilled excavations within the reserve pit, flare pit, and gravel drill pad areas, as well as areas adjacent to the gravel drill -pad, are currently ready for re- vegetation. A site - specific rehabilitation plan is being developed separately to address re- vegetation at this site. Regards, Mike Mike Mc Anulty Environmental Project Manager BP /Remediation Management 2/1/2012 Page 2 of 2 • (W): (907) 771 -8081 E -mail: mcanumc @bp.com Mailing Address: 900 E. Benson Blvd, 223B Anchorage, Alaska 99519 Physical Address: 3000 C Street, 223B Anchorage, Alaska 99503 -3975 Confidentiality: The information contained in this e-mail message is intended only for the use of the individual or entity to whom it is addressed and may contain legally privileged, confidential information or work product. If the reader of this message is not the intended recipient, you are hereby notified that any use, dissemination, distribution, or forwarding of this message is strictly prohibited. 2/1/2012 • • sumE o[F ARLsIA II SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 David Reem Engineering Team Leader BP Exploration (Alaska), Inc. _ P.O. Box 196612 1 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PR331213 Sundry Number: 312 -036 BOO) JAN cr 62 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. S • erel !1r' K. N . rman Com • • - ioner - DATED this (..3( day of January, 2012. Encl. .. 1 � �l't • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL JA!‘,: '' 4 2012 20 AAC 25.280 „_ ,•r, 1. Type of Request: r. 7.., ., ., , �::.ti�r.r�,c . - Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate • ® Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. _I Development ❑ Exploratory 169 - 104 • 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50 029 - 20047 - 00 - 00 ' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PR331213 Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): ADL 028278 Prudhoe Bay Field / Prudhoe Bay Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9332' • 9332' • 9237' 9237' 2523' None Casing Length Size MD TVD Burst Collapse Structural 91' 30" 91' 91' Conductor 2195' 20" 2195' 2195' 2320 1500 Surface 3982' 13 -3/8" 3982' 3982' 3450 1950 Intermediate 2416' 10 -3/4" 2416' 2416' 5210 2480 Production 5291' 9 -5/8" 4002' - 9293' 4002' - 9293' 6870 4760 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None None None None Packers and SSSV Type: None Packers and SSSV N/A MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: IS Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ∎= Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 15,2012 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR . ® Abandoned ❑ WAG ❑ SPLUG ❑ Suspended Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact David Bjork, 564 -5683 Printed Name avid Reem Title Engineering Team Leader Prepared By Name /Number: Signature Phone 564 - 5743 Date z3 2f31 Joe Lastufka, 564 - 409 1 Commission Use Only Coryfitions of approval: lyotify Commission so that a representative may witn,s s 2 . Li_7 / h1t11 Sundry Number 2 0 � Plug Integrity BOP Te st ❑ Mechanicall Integrity T est Location Clearance * 3 5a� r 3- doe / 5 saM,�.�. zoii- Other: N o ,F 5 L,, s e- .mss /ii s Subsequent Form Required: /0 •. 4/67 // MM APPROVED BY / /�/� v Approved By: ‘`�G' COISSIONER THE COMMISSION Date ` f �G/J � V Form 10-403 �9 16pd) 1 JA 31 ' 1 U R 1 G 1 N A L ,Submit In Duplica Y 1 ,V lL7L,ri1/1 / 3 / —/ l/ 7l�- \ k • • � bp GPi6p cI" to Put River 33 -12 -13 (Plug and Abandon) I 5e,4-- 3 Scope of Work: Recover collapsed 10-3/4" and 9- Tie the 9- back to surface. Mill out bridge plug at 2,523ft and drift to PBTD. P&A Well Post Rig. Engineer: David Bjork MASP: 2,270 -psi Well Type: Triassic Sadlerochit Appraisal Well suspended 12/20/1969 Estimated Start Date: March 15th, 2012 Pre -Riq Work Request: W 1 Check all lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). PPPOT -T. F 2 MIT -T to 1,000 -psi. MIT -OA, OOA, 000A to 500 -psi. Circulate 100 bbls of diesel around from OOA to 000A to ensure free circulation for post -rig cement job. W 3 Set a BPV in the tubing hanger. Riq Procedure 1. MIRU. ND dry hole tree. NU and test BOPE with four preventer stack (consisting of annular, 10- fixed, blind /shear, mudcross and 3 - x 6" VBR's) to 250 psi low /3,500 psi high. 2. PU DP and run tapered pilot mill assembly and open up collapsed section to - 5- -' / ". 3. RIH with mechanical cutter to below the collapsed section and cut the pipe. 4. Recover the pipe and repeat as necessary to access bridge plug. 5. Change the 103/4" fixed rams to 9 fixed rams and test to 3,500 -psi. 6. Cut the 9- -50ft above the bridge plug and recover same, dress off the 9 casing stub. 7. Run 9 47# BTC with Bowen sealing overshot and TAM port collar and hang off at surface. Test the 9 to 2,500 -psi. 8. Install tubing spool and pack -off. 9. Test the 13 x 9 annulus to 1,000 -psi. If the annulus leaks check for communication in the 16" curtain string. 10. Drill out 9 CIBP at 2,523ft and drift to TD at - 9,200ft. Swap to clean seawater. 11. Open port collar and freeze protect 9 x 13 and 9 to 2,000ft. 12. ND BOPE. Install dry hole tree. RDMO. Post -Riq P &A Procedure .234- i (3'-- 1. RU CTU and lay in 15.8ppg cement from PBTD to -6000' MD (-235 bbls). "7g 2_ 32 t ✓ 2. Notify AOGCC Inspectors for witness of test and Tag and PT cement plug to 2500 -psi. 3. Perforate the 9 casing at -3000' MD. 4. Circulate 15.8 ppg rent down the 9 casing and up th- 3- / x •- :" casing surface to surface ��=►`� �'�- (-- 4965). 73 a x . 3h , + � ,cs- /Sae-- �5. Circulate 15.8 ppg cement down the 16" x 13 annulus and • - - :' 16" annulus surface to surface ( -350 bbls). szi r ziv. -4 X z/cc) = 3 o rsrt 6. Excavate around wellhead. 7. Cut off and remove the casing and wellhead a minimum of 3' below original tundra level. 8. Fill all unfilled annuli to surface with cement. • • a. Notify Inspector of opportunity to witness cut off prior to welding plate. b. Take pictures once wellhead is cut -off. 9. Place an abandonment plate on top of the cut off - _ . • • w: • • - • Ilowin • information: BP Exploration Alaska, Inc. Put River 33 -12 -13 PTD# 169 -104 API No. 50- 029 -20047 C ., „ Co PK s 5; �- 61" ` :1LE C -in- s1 � 1 Z- • • 0 bp GPaj3 L- Put River 33 -12 -13 (Plug and Abandon) Scope of Work: Recover collapsed 10 -3/4" and 9 -5/8 ". Tie the 9 -5/8" back to surface. Mill out bridge plug at 2,523ft and drift to PBTD. P &A Well Post Rig. J Engineer: David Bork MASP: 2,270 psi Well Type: Triassic Sadlerochit Appraisal Well suspended 12/20/1969 Estimated Start Date: March 15th, 2012 Pre-Riq Work Request: P W 1 Check all lock down screws for free movement. Completely back out and check each ' °" t"" lock down screw for breakage (check one at a time). PPPOT -T. F 2 MIT -T to 1,000 -psi. MIT -OA, OOA, 000A to 500 -psi. Circulate 100 bbls of diesel around from OOA to 000A to ensure free circulation for post -rig cement job. W 3 Set a BPV in the tubing hanger. Riq Procedure 1. MIRU. ND dry hole tree. NU and test BOPE with three preventer stack (consisting of annular, blind /shear, mudcross and 3 - x 6" VBR's) to 250 psi low /3,500 psi high. 2. PU DP and run tapered pilot mill assembly and open up collapsed section to - 5'/ ". 3. RIH with mechanical cu -r to below the collapsed section and cut the pipe. 4. Recover the pipe and re. -at as necessary to access bridge plug. 5. Cut the 9- -50ft above t - bridge plug and recover same, dress off the 9 - casing stub. 6. Run 9 47# BTC with Bowen - -ling overshot and TAM port c• - - - • - • •ff at surface. Test the 9 to 2,500 -psi. Note: Pipe rams • ed to 9- as the well has multiple barriers (bridge plug at 2,523ft, kill weight - Mud an • . • erforated cemented welibore) to the reservoir. 7. Install tubin s pack -off. 8. Test th - 8 " x 9 - / annulus to 1,000 -psi. If the annulus Teaks check for communication in the 16" curtain string. 9. Drill out 9 CIBP at 2,523ft and drift to TD at - 9,200ft. Swap to clean seawater. 10. Open port collar and freeze protect 9 x 13 - and 9 to 2,000ft. 11. ND BOPE. Install dry hole tree. RDMO. Post -Riq P &A Procedure w / CT _ 1. RU CTU and lay in 15.8ppg cement from PBTD to -6000' MD ( -235 bbls). -' ISO 0 fes .3S'b°r4.. 2. Notify AOGCC Inspectors for witness of test and Tag and PT cement plug to 2500 -psi. 3. Perforate the 9 -5/8" casing at -3000' MD. 4. Circulate 15.8 ppg cement down the 9 -5/8" casing and up the 13 -3/8" x 9 -5/8" casing surface to surface ( -190 bbls). 5. Circulate 15.8 ppg cement down the 16" x 13 -3/8" annulus and up the 20" x 16" annulus surface to surface ( -350 bbls). 6. Excavate around wellhead. 7. Cut off and remove the casing and wellhead a minimum of 3' below original tundra level. • 8. Fill all unfilled annuli to surface with cement. a. Notify Inspector of opportunity to witness cut off prior to welding plate. b. Take pictures once wellhead is cut -off. 9. Place an abandonment plate on top of the cu • • . - - • • • me following information: BP Exploration Alaska, Inc. Put River 33 -12 -13 PTD# 169 -104 API No. 50- 029 -20047 ,) • • a Current Put River 33 -12 -13 API 50- 029 -20047 PTD 169 -104 \I ? ootc L 30" shoe @ 91' MD Collapsed Casing @ 841' - 853' MD Min ID = 2.09" Collapsed Casing @ 1,066' — 1,078' MD Min ID= 2.12" 16" casing @ 2,095' MD 13 -3/8" DV @ 2,145' MD 4 20" shoe @ 2,195' MD 9-5/8" x 10'/4" x- over @ 2,416' MD 10 Collapsed Casing @ '/<" DV @ 2293' MD 2,489' — 2,495' MD Min ID = 5.08" Bridge Plug @ 2,523' MD — . >C A 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Cement TOC calculated @ 6,088' MD Diesel Kenpak Mud 9 -5/8" Float @ 9,237' MD • r sed Post-Rig-Workover opo - Workover g Put River 33 -12 -13 API 50- 029 -20047 PTD 169 -104 30" shoe @ 91' MD 16" casing @ 2,095' MD _ 13 -3/8" x 9 -5/8" & 9 -5/8" Freeze protected —2200' MD to surface 13 -3/8" DV @ 2,145' MD 20" shoe @ 2,195' MD Port Collar @ —2200' MD Casing Patch @ —2,500' MD ► 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Cement TOC calculated @ 6,088' MD Diesel Sea Water Mud 9 -5/8" Float @ 9,237' MD • • G Proposed P &A Status Put River 33 -12 -13 (OA API 50-029-20047 PTD 169 -104 30" shoe @ 91' MD 16" casing @ 2,095' MD - 13 -3/8" x 9 -5/8" & 9 -5/8" Freeze protected -2200' MD to surface 13 -3/8" DV @ 2,145' MD 4 20" shoe @ 2,195' MD Port Collar @ -2200' MD Casing Patch @ - 2,500' MD ► 4 ,41 .701)4 4 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD TOC calculated @ 6,088' MD Cement Sea Water I Mud I L 9 -5/8" Float @ 9,237' MD Page 1 of 1 • Schwartz, Guy L (DOA) From: Bjork, David [David.Bjork @bp.com] Sent: Monday, January 30, 2012 4:10 PM To: Schwartz, Guy L (DOA) Cc: Reem, David C; Hubble, Terrie L Subject: RE: PR331213 P &A (PTD 169 -104) Attachments: P -A scope of work RWO +CT rev2.ZIP Guy, I concur with your recommendations. The revised scope of work is attached. Regards, Dave From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Monday, January 30, 2012 10:48 AM To: Bjork, David Subject: PR331213 P &A (PTD 169 -104) Dave, In reviewing the sundry to P &A the well Put River 331213 the initial BOP ram distribution should be changed. I see you have two VBR's (3 % - 6 ") . Regulations require casing rams for the 10 3 /" ( pulling the casing ) and 9 5/8" rams for running the new casing since your stated barriers are negated when you cut casing and are open to the OA at this point. Granted the TOC ( cement) should cover the reservoir but this is a remote site so I think it is better to err on the side of caution Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 1/30/2012 Request for extension of suspended us of Put River 33 -12 -13 (PTD 169 -104) Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, April 19, 2011 4:27 PM To: 'Gathman, Brad' Cc: Cismoski, Doug A; Kara, Danny T; McMains, Stephen E (DOA) Subject: RE: Request for extension of suspended status of Put River 33 -12 -13 (PTD 169 -104) Brad, The Commission agrees that it would be better to regroup and come back next year to continue the P & A operations on Put River 33- 12 -13. The ice road season is quickly coming to an end for this winter. With collapsed casing the options to access the lower part of the wellbore become complex and will likely require a rotary rig. The well may remain suspended with the existing barriers already approved in the earlier sundry (# 310 -346 ) "Suspended Status Renewal ". You are granted a 2 yr extension to the suspended status of the PR33 -12 -13 (until 12/31/13) with the understanding that operations to P & A will resume next winter ice season. Sundry 311 -091 will be withdrawn per your request below. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC At340#60 AP 20 793 -1226 (office) 444 -3433 (cell) From: Gathman, Brad [mailto:Brad.Gathman @bp.com] Sent: Monday, April 18, 2011 4:50 PM To: Schwartz, Guy L (DOA) Cc: Cismoski, Doug A; Kara, Danny T Subject: Request for extension of suspended status of Put River 33 -12 -13 (PTD 169 -104) Mr. Guy Schwartz, Put River 33 -12 -13 (PTD 169 -104) was drilled and suspended in 1969. This well was drilled from a gravel pad approximately 1 mile west of T pad. There is currently no gravel road to access this pad and requires an ice road to gain access. A suspended well inspection was completed on 9/22/10 and the results were submitted with a report of Sundry Well Operations (form 10 -404) on 9/25/10. There was no discoloration and no sheens on the pad, pits, or in nearby water. This well was drilled to a depth of 9,237' MD, but was never perforated. The well is mechanically sound based on cemented casing. A bridge plug was set at 2,523' MD to secure the well before the final suspension on 12/20/69. BPXA received a Sundry (311 -091) to P&A this well during the ice road season of 2010/2011. However, collapsed casing was encountered and the proposed plan to complete the P &A will not be possible. There were 3 sections of collapsed casing found above the bridge plug. The top 2 collapsed sections were at 841' - 853' and 1,066' - 1,078' in the 10 -3/4" casing. The last section of collapsed casing was at 2,489' - 2,495' in the 9 -5/8" casing. The status of the 13 -3/8" casing is unclear at this time. 4/19/2011 Request for extension of suspended.us of Put River 33 -12 -13 (PTD 169 -104 Page 2 of 2 BPXA received a renewal of suspension status until 12/31/2011 via Sundry 310 -436. Due to the collapsed casing a new scope of work must be generated to complete this P &A. We request an extension of suspended status for Put River 33 -12 -13 of up to 3 years, until 12/31/14 to complete the Put River 33 -12 -13 P &A. A variance to the provisions of 20 AAC 25.110(c)(2) is requested under 20 AAC 25.112 (i) to allow the well to remain suspended in its current condition. If this is acceptable, BP will withdraw Sundry 311 -091. Attached is a schematic of the current completion for Put River 33- 12 -13. Please contact me with any questions. Thanks, Brad Gathman Well Intervention Engineer BP Exploration Alaska office +1 907 564 5778 Cell (907) 242 -2034 «Put River 33 -12 -13 Current Completion_collapsed casing.vsd» 4/19/2011 • Current • Put River 33 -12 -13 API5 - - 047 PTD 169 -104 30" shoe @ 91' MD Collapsed Casing @ 841' - 853' MD ID = 2.09 " Collapsed Casing @ 1,066' — 1,078' MD Min ID = 2.12" 6 > 16" casing @ 2,095' MD _ 13 -3/8" DV @ 2,145' MD k 20" shoe @ 2,195' MD 9 -5/8" x 10-%" x -over @ 2,416' MD Collapsed Casing @ 10-3/t" DV @ 2293' MD 2,489' — 2,495' MD Min ID = 5.08" Bridge Plug @ 2,523' MD 1 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Cement TOC calculated @ 6,088' MD Diesel Kenpak I Mud ,. 9 -5/8" Float @ 9,237' MD • Current Put River 33 -12 -13 API 50-029-20047 PTD 169 -104 1�SIa 11 1 a ` t/ �6 /7 ' 30" shoe @ 91' MD poi 16" casing @ 2,095' MD 13-3/8" DV @ 2,145' MD IL 20" shoe @ 2,195' MD 11=r 103/4' DV @2293'MD 2 in Yt" 9 -5/8" x 10- x -over @ 2,416' MD ° (� �o 5/9 "cay f Bridge Plug @ 2,523' MD < lest. 5 00 cl r, p e 370,0 ( 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Cement Diesel Kenpak Mud I L 9 -5/8" Float @ 9,237' MD (1;ro_p_saeLl Put River 33 -12 -13 API 50- 029 -20047 PTD 169 -104 4 30" shoe @ 91' N I 16" casing @ 2,095' MD N� �\ �i � \ /, 133/8 "DV @2,145'MD ° %': 4 20" shoe @ 2,195' MD \ \ _ ' ' �! < 10 -%" DV @ 2293' M D �\ - - : - : " 9 -5/8" x 10 -3/4" x -over @ 2,416' MD \ .;; 0 .... / it - / \ 0 c/ 1 -sz e.., z \ / /// • � art j ''� // , 11 Cement Plug 3,700' MD Surfr - , i fi1 13 -3/8" shoe @ 3982 9 -5/8" DV @ 4,002' MD ird Current Cement \.\ / Proposed Cement Seawater \ Cement Top @ 7,300' MD Mud 4 / tI 9 -5/8" Float @ 9,237' MD . . /SEANPARNELLGOVERNOR Sli AlfE ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMAIISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Doug Cismoski Petroleum Engineer BP Exploration (Alaska), Inc. + t P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PR 331213 Sundry Number: 311 -091 Dear Mr. Cismoski: R 9 2.[111 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holid. o weekend. ij rna ,, C • mi loner DATED this day of March, 2011. Encl. . STATE OF ALASKA -' ° �/ ALASK�IL AND GAS CONSERVATION COMMISN 2, I\ APPLICATION FOR SUNDRY APPROVAL `' 20 AAC 25.280 1. Type of Request: ® Abandon - ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - ® Development ❑ Exploratory 169 - 104 - 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50 029 - 20047 - 00 - 00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PR 331213 - Spacing Exception Required? ❑ Yes ® No 9. Property Designation: 10. Field / Pool(s): _ ADL 028278 - Prudhoe Bay Field / Prudhoe Bay Oil Pool 11 • PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9332' 9332' 9237' 9237' 2523' None Casing Length Size MD TVD Burst Collapse Structural 91' 30" 91' 91' Conductor 2195' 20" 2195' 2195' 2320 1500 Surface 3982' 13 -3/8" 3982' 3982' 3450 1950 Intermediate 2416' 10 -3/4" 2416' 2416' 5210 2480 Production 5291' 9-5/8" 4002' - 9293' 4002' - 9293' 6870 4760 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): None None None None None Packers and SSSV Type: None Packers and SSSV N/A MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory - IN Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: I Commencing Operations: March 31, 2011 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR - ® Abandoned Commission Representative: ❑ WAG ❑ SPLUG ❑ Suspended 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Brad Gathman, 564 -5778 Printed Name Doug Cismoski, P.E. Title Wells Intervention Manager Prepared By Name/Number. Signature j f //_ /' i( Phone 564 - 4303 Date 00// Elizabeth Barker, 564 -5674 � � ' `—^_\ Commission Use Only Con ons of approval: Notify Commission so that a representative may witness Sundry Number 3 " Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ,Location Clearance RECEIVED f-- Phbto D/-OGt.c.me. � Oz. d b C.k i' �- o T � 'Focc- £ Other. q -'far t...i t �i / /4...& . I MAR '2 4 7011 .— Akt k 2 s G` r Q- S ; n i s of P Masks ill & 4as Cogs. Commission Subsequent Form Required: /61 — / 7/ Anchorage APPROVED BY 2� c�"/ Approved By: age( COMMISSIONER THE COMMISSION Date �,/ f�t� ! Form 10-403 i 1 2 # r . R n L 4._ 3.2 Y• f( Submit In Duplicate #0'°e% • • Summary of Proposed Work BP Exploration (Alaska) Inc. (BPXA) P & A Program Put River 33 -12 -13 PTD 169 -104 API No. 50- 029 -20047 Present Well Condition The well is a vertical well which was drilled to a depth of 9,332' MD, and is cased as follows: Casing Size Weight Grade Depth (MD) Cementing Record Structural 30" Stove Pipe 91' 250 sacks Permafrost cmt Conductor 20" 133/94 J55/H40 2195' 4000 sacks Permafrost cmt Surface 13 -3/8" 68/61 K55 3982' 2120 sacks class G Intermediate 10 -3/4" 55.5 N80 Surface - 2416' Production 9 -5/8" 47 N80 2416' - 9293' 1500 sacks class G The procedure below outlines the steps to perform a plug and abandonment of Put River 33- 12 -13. To ./ gain access to the bottom of the well, a hole must be drilled through a 9 -5/8" CIBP. A service coiled tubing unit will be used to mill a pilot hole through the CIBP. This well was not perforated and two cement plugs will be placed downhole to abandon this well. The first cement plug will be placed from 9,237' MD (PBTD) to 7,300' MD in the 9 -5/8" casing. The / second cement plug will be placed across the surface shoe from 3,700' MD to surface in both the annulus and casing. In addition to the cement plugs, the diesel will be circulated out of the 20" x 13 -3/8" annulus. A 16" curtain string was run in this annulus to a depth of 2,095' MD. After circulating out the diesel, cement will be circulated to surface in the 20" x 13 -3/8" annulus. Once the cement plugs are placed, the site will be excavated and the wellhead will be cut off a minimum - of 4' below tundra level. A marker plate will be placed on top of the cut -off casing stating the Operators name, well name, PTD, and API number. We expect to start the abandonment on March 31, 2011. Below is the procedure to abandon Put River 33- 12 -13: p � q4 fi „ ? ,f y / mit e t welt w as dr,y(�� ;� ('64 �s f T 4e tl k, of -•froo- d, " //y o l`t ar;ei 0A 6 . , itj Us•a - dr�(e o ar 1 T P `''p t �.►n rje fraie prodver, P no' "of (...as /Wee' c� � d„ a £•f(c wtt( / o. ir4 G i T f4 C1, The w�c(( J (ots+!`ed i t O dr DI'J /script T `� /�D 1 1'1 (/f"1' � it entatip�` y 419/ /es'wr` r 1464 NOT bee" de fr °W."' 1 n - 4/f 491 r o t . 1 `p r cr '4q;w f e 7 e fore, oc• tese - veS rev /e4. i f 0' at 1..'v/I' A00 00 Army; • • Procedure to Plug and Abandon Put River 33- 12 -13: 1. Weld on flange to existing flange to allow service equipment to rig up and enter the wellbore. Zoo dos- 2. Pressure test flange and casing to 3. Open up annulus valves on curtain string and establish circulation with diesel around the 16" casing. 4. Circulate Arctic Set cement around the 16" casing to surface in the 13 -3/8" x 20" annulus. 5. Mill hole in bridge plug @ 2523' MD using coiled tubing. sf.., � Z� 6. Circulate out mud with Seawater. ( h4.f PT) 7. Lay in 15.8# class G cement plug from 9,237' (PBTD) to 7,300' MD. Z ,7s4 8. Tag cement and PT tosi. 9. Perforate through 9 -5/8" casing at 3,700' MD. 10. Establish circulation to surface in the 13 -3/8" x 9 -5/8" annulus. 11. Circulate Arctic Set cement into 13 -3/8" x 9 -5/8" annulus from 3,700' to surface. 12. Lay in Arctic Set cement from 3,700' MD to surface in the 9 -5/8" and 10 -3/4" casing. 13. Excavate around wellhead. 14. Cut off and remove the casing and wellhead a minimum of 4' below original tundra level. 15. Fill all unfilled annuli to surface with cement. a. Notify Inspector of opportunity to witness cut off prior to welding plate. ✓ b. Take pictures once wellhead is cut -off. 16. Place an abandonment plate on top of the cut off casing with the following information: BP Exploration Alaska, Inc. Put River 33 -12 -13 PTD# 169 -104 API No. 50- 029 -20047 • • Current Put River 33 -12 -13 API 50 -029 -20047 PTD 169 -104 1 ° NA 3� 3 O /7 ;(/ / 7 J _ 30" shoe @ 91' MD 16" casing @ 2,095' MD 4 13-3/8" DV @ 2,145' MD I L 20" shoe @ 2,195' MD 10- DV @2293' MD 9 -5/8" x 10 - x -over @ 2,416' MD Bridge Plug @ 2,523' MD '"-- peer !, e 3700 N"° 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Cement Diesel Kenpak Mud I L 9 -5/8" Float @ 9,237' MD • • Proposed Put River 33 -12 -13 API 50- 029 -20047 PTD 169 -104 4 30" shoe @ 91' MD 4 16" casing @ 2,095' MD 13 -3/8" DV @ 2,145' MD j/ 20" shoe ,@ @ 2,195' MD 2293 MD N „ j DV 9 -5/8" x 10 -% x -over @ 2,416' MD \ Cement Plug 3,700' MD - Surface .,..‘„\\,\\.\\\ _ / 13 -3/8" shoe @ 3982' MD 9 -5/8" DV @ 4,002' MD Current Cement \ Proposed Cement fl Seawater Mud Cement Top @ 7,300' MD 9 -5/8" Float @ 9,237' MD Page 1 of 1 • Schwartz, Guy L (DOA) From: Gathman, Brad [Brad.Gathman @bp.com] Sent: Thursday, March 24, 2011 3:40 PM To: Schwartz, Guy L (DOA) Subject: RE: PR 331213 P &A (PTD 169 -104) Guy, I will change our procedure to test the 9 -5/8" x 10 -3/4" casing to 2000 psi after drilling thru the CIBP. After we complete the P &A and cut off the wellhead, another group (remediation group) is in control of remediation of the gravel pad. I can check with their schedule, but I believe once we are finished with the P &A, they will move in their equipment and complete the work. Thanks, Brad Gathman Well Intervention Engineer BP Exploration Alaska office +1 907 564 5778 Cell (907) 242 -2034 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz @alaska.gov] Sent: Thursday, March 24, 2011 3:20 PM To: Gathman, Brad Subject: PR 331213 P &A (PTD 169 -104) Brad, As per our conversation please test the 9 5/8" x 10 3 /" casing after drilling thru the CIBP to 2000 psi (instead of /Q 1000 psi listed in your procedure). L� Pc, z. d , 4,Qc zs .' /12- 0) t Z Also, there is no mention of what is happening with surface remediation...do you have any updates on the schedule for that part of the pad reclamation. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793 -1226 (office) 444 -3433 (cell) 3/24/2011 • SUITE AELASEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 Gary Preble Date Management Engineer SNED .SAN 1 2 'U)` BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519 -6612 1 �` Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PR331213 Sundry Number: 310 -436 Dear Mr. Preble: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, (10 Daniel T. Seamount, Jr. Chair DATED this day of January, 2011. Encl. ���� • STATE OF ALASKA • IVE cdi ,( ALASKA OIL AND GAS CONSERVATION COMMISSION 1A APPLICATION FOR SUNDRY APPROVAL 2010 20 AAC 25.280 4 Contagion 1. Type of Request: Abandon Plug for Redrill ploy r) 13i � g r yp q ❑ g ❑ Perforate New Pool ❑ Repair Well ❑ �hapg �e',�pp El Sus end Plug Perforations Perforate Pull Tubing F4IICl u Time Program P ❑ 9 ❑ ❑ 9 ❑ Time Extension ❑ Operation Shutdown ❑ Re -enter Susp. Well ❑ Stimulate ❑ Alter Casing ❑ Other: RENEW SUSPENSION - El 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development Ei _ Exploratory ❑ 169 -1040 3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20047- 00 -00- 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: • Spacing Exception Required? Yes ❑ No ❑ PR331213 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 028278. PRUDHOE BAY Field / PRUDHOE BAY Pool ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9332 9332 9237 9237 2523' NONE Casing Length Size MD TVD Burst Collapse Structural 91 30' INS PIPE SURFACE 91 SURFACE 91 Conductor 2195 20" SURFACE 2195 SURFACE 2195 Surface 3982 13 -3/8" SURFACE 3982 SURFACE 3982 Intermediate 2416 10 -3/4" SURFACE 2416 SURFACE 2416 Production 5291 9-5/8" 4002 9293 4002 9293 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): NONE- - NONE Packers and SSSV Tvae: NONE Packers and SSSV MD and TVD (ft): 12. Attachments: Description Summary of Proposal El 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development El - Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 1/4/2011 Oil ❑ Gas ❑ WDSPL ❑ Suspended - 0 16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Printed Name Ga •le / Title Data Management Engineer Signat re iiili,p Phone Date 564 -4944 12/21/2010 Prepared by Gary Preble 564 -4944 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3104130 Plug Integrity ❑ BOP Test '0 e ( \ Mechanic ca al Integrity Test ❑ Location Clearance ❑ Other: �X .64% r. S 1,4 h y u-�✓ � T f( 12 /3l /Zon o f •/4 n e-Q Subsequent Form Required: rr y _t-L, 4--- Approved by 7 C OMMISSIONER THE COMMISSION Date: Form 10 403 Revised 1/2010 71 / -s °/ 0 R I G I OtiWS AN 08 ' ' 0 e Submit in Du plicate { • s • • Prudhoe Bay Unit well TR PR 33 -12 -13 Technical Justification for Application for Renewal of Suspension Status December 17, 2010 Well Status PBU TR PR 33 -12 -13 (PTD 1691040) was suspended on 12/20/69 after drilling to TD and cementing casing. The well is located on single well inactive gravel pad not accessible from the PBU road system, about 1 mile west of PBU T pad. BP Exploration (Alaska), Inc. (BPXA) completed a suspended well inspection of PBU TR PR 33 -12 -13 on 09/22/10. The results of that inspection were submitted with a Report of Sundry Well Operations (form 10 -404) on 9/25/10. PBU TR PR 33 -12 -13 is secured with cemented casing and a bridge plug. The well was not perforated. The well is mechanically sound based on cemented casing. The well will not allow the migration of fluids, will not damage freshwater or producing or potentially producing formations, will not impair the recovery of oil or gas, and is secure, safe, and not a threat to public health. The strata through which the well was drilled is neither abnormally geo- pressured or depleted. The well is planned to be plugged and abandoned in 2011: There are no facilities near this well and the Ivishak in this area has been developed from F, R and T pads. Condition of the Wellhead and Surface Location PBU TR PR 33 -12 -13 is located on an inactive pad with clean gravel. The pit and surrounding area are in good condition with some remaining debris. There is no discoloration and no sheens on the pad, pits, or in nearby water. During the inspection, it was noted that the well sign is damaged. The current well pressure readings are unavailable due to the current configuration of the tree. Request BPXA requests approval for renewal of the existing suspension status for PBU TR PR 33 -12- 13 through 12/31/2011 to allow time for the planned P &A to be completed. A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC 25.112 (i) to allow the well to be remain suspended in its current condition. All hydrocarbon intervals are isolated and there are no underground sources of fresh water in this area. MLB 12/17/10 • • • ' COMPLETION DIAGRAM WELL No. BP 41- 33 -12 -13 RTKB 48. 38, FT. AMSL BASE FLANGE 27.88" FT. ANSI 22 + VS,k M1V , 30" CONDUCTOR PIPE iv � y " . t .5 Y � � i j 3 �� J � f y � Cemented to surface with 150 ;:1�s +; { sacks Fondu Fly Ash. f ','?- y ••• i,•,-„•;, •,3 f } a }b y • ll z ;: I tS 40 1 w! ?4';- K 30' SHOE 91 FT. 20 CASING • / r i �' f {x., Ce to surface with 4000 sacks i'Vi F ry Permafrost cement plus 0.5% CFR -2. � w' ' 16" SHOE 2095 FT. r Z s�3 ,i w � i L7 .. L � f , }s :, 13 3/8 DV 2145 FT. Z§r.; Y � � � 0` SHOE 2195 FT. • .F 3 1lxl r4 " s.,' 0 3/4 DY 2293 FT. • 13 3/8 CASING '•* � „,,••' fi' 9 5/8� 10 3/4 X—OYER 2416 FT. Cemented in two stages .• . `` S 1st Stage: • ,. '� ��`.. -� BRIDGE ?LUG 2523 FT. 2120 sacks Class 'G' (4% gel, 0.5% CFR -2) ,N =' ►��-�1 to 2145' (DY) \ 4 ::::::::,....;•: 2nd Stage: i .` Diesel Oil from DV to surface. ;: '' ' 13 3/8" SHOE 3982 FT. 9 5/8/10 3/4' CASING "'. • ^ Cemented in two stages • . : 9 5/8" DY 4002 FT 1st Stage: j • , ;;;..• 500 sacks. Class 'G' with 10% gel, 1% CFR -2 0/ ' '• •: followed by 1000 sacks '0' (18% salt, 1% CFR -2) •"..;i:::•:•::: to 9 5/8 DY at 4002 2nd Stage: '. Not cemented due to lost circulation. (100 bbl. Kenpak mud in 10 3/4713 3/8" annulus. Of 51? .;.;: LEGEND ,° • ® Cement / .:•" S: 4 9 5/8" FLOAT 9231 F gia Diesel �`�" 12 HOE S HOLE 9332 F Efill Kenpak ALL DEPTHS INDICATED ARE DRILLERS DEPTHS BELOW KELLY BUSHING EV Mud ` STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate[] Other INSPECT Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver❑ Time Extension ❑ WELL Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development Q Exploratory ❑ \ 169 -1040 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 � 50- 029 - 20047 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: IN ADLO- 028278 PR331213 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE BAY POOL 11. Present Well Condition Summary: Total Depth measured 9332 feet Plugs (measured) 2523' feet true vertical 9332 feet Junk (measured) None feet Effective Depth measured 9237 feet Packer (measured) true vertical 9237 feet (true vertical) Casing Length Size MD TVD Burst Collapse Structural 91 30" INS PIPE SURFACE - 91 SURFACE-91 Conductor 2195 20" SURFACE - 2195 SURFACE - 2195 Surface 3982 13 -3/8" SURFACE - 3982 SURFACE - 3982 Intermediate 2416 10 -3/4" SURFACE - 2416 SURFACE - 2416 Production 5291 9 -5/8" 4002 - 9293 4002 - 9293 Liner Liner { Perforation depth: Measured depth: NONE - = ���i) l� _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) NONE 0 Packers and SSSV (type, measured and true vertical depth) NONE O 0 7 2010 12. Stimulation or cement squeeze summary: n:�Q Intervals treated (measured):�i��l��ae� AwM83e Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: NONE Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ elopment Service ❑ Daily Report of Well Operations X 16. Well Status after we SUSPENDED Oil F1 Gas LJ WDSPL GSTOR ❑ WAG ❑ GINJ ❑ WINJ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Preb a Title Data Management Engineer I_ Signature one 564 -4944 Date ' 1 4 r � 0 r a Prudhoe Bay Unit TR Put River 33- 12 -13, PTD 1691040 Suspended Well Inspection Report BP Exploration (Alaska) Inc. (BPXA) completed a suspended well inspection of PBU TR Put River 33 -12 -13 on 9/25/10. The following attachments document the inspection and the current condition of the well (reference 20 AAC 25.110 (e) and • Suspended Well Site Inspection form documenting the well pressures and site condition. AOGCC inspector Jeff Jones witnessed the inspection. • Wellbore diagram illustrating the current configuration of the well • There are no wells with surface locations within one - quarter mile radius of the surface location. • Photographs showing the condition of the wellhead and the surrounding location Additional pertinent information: • PBU TR Put River 33 -12 -13 was suspended on 12/20/69 after drilling to TD and cementing casing. • PBU TR Put River 33 -12 -13 was drilled from a remote pad about 1 mile west of T pad. • The strata through which the well was drilled is neither abnormally geo- pressured or depleted. • The well is secured with cemented casing and a bridge plug. The we was not perforated. 't • The well is mechanically sound based on cemented casing. . MLB 09/25/10 Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: Put River 33 -12 -13 Field /Pool: PRUDHOE BAY Permit # (PTD): 69 -104 API Number: 50- 029 -20047 Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 12/20/1969 Surface Location: Section: 33 Twsp: 12N Range: 13E Nearest active pad or road: T pad Take to Location Digital camera Map showing well location /Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for Fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Good Pad or location surface: Trash; wood and metal debris on pad Location cleanup needed: clean up pad Pits condition: Good; appears to be material & debris in north east corner Surrounding area condition: Good Water /fluids on pad: None Discoloration, Sheens on pad, pits or water: None Samples taken: None Access road condition: N/A Photographs taken (# and description): 11; wellhead and general site Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Well description, condition: Needle valves on annulus seized up; Gate valves function but are blinded No master valve Cellar description, condition, fluids: Clean; no fluids Rat Hole: 2 Wellhouse or protective barriers: Wooden guard Well identification sign: Original sign is faded and missing half Tubing Pressure (or casing if no tubing): N/A Annulus pressures: N/A tjo C�k. Wellhead Photos taken (# and description): 11; wellhead and general site Work Required: None Operator Rep (name and signature): Jerry Murphy AOGCC Inspector: Jeff Jones Other Obse s: Rya olt Inspection Date: 9/25/2010 AOGCC Notice Date: M2012010 Time of arrival 10:00 AM Time of Departure: 10:15 AM Site access method: Fly E COMPLETION DIAGRAM WELL No. BP 41- 33 -12 -13 RTKB' 48. 38, FT. AMSL BASE FLANGE 27.88 FT. AMSL 30" CONDUCTOR PIPE Cemented to surface with 150 sacks Fondu Fly Ash. " . <•: . > w 30' SHOE 91 FT. 20" CASING tt '' Cemented to surface with 4000 sacks Permafrost cement plus 0.5% CFR -2. A': v ` ; ; 16" SHOE 2095 FT. 13 3/8" DV 2145 FT. 20" SHOE 2195 FT. > £' _ • s4 10 3/4" DV 2293 FT. 13 3/8 CASING .k'` 9 5/8/ 10 3/4 X 4VER 2416 FT. Cemented in two stages }' BRIDGE PLUG 2523 FT. 1st Stage: :.< >:<: °...„ "q . 2120 sacks Class E G E (4% gel, 0.5% CFR -2) to 2145 (DV) 2nd Stage: Diesel Oil from DV to surface. oe 13 3 1. 'sp 13 3/8" SHOE 3982 FT. 9 5410 3/4" CASING > Cemented in two stages 1st Stage: °A^ 9 5/8" DV 4002 FT. 500 sacks. Class G with 10% gel, 1 CFR -2 °tooago °, followed by 1000 sacks T (18% salt, 1% CFR -2) to 9 5/8 OV at 4002 oao4 °e 2nd Stage: Not cemented due to lost circulation. (100 bbl. Kenpak mud in 10 3/413 3/8" annulus. oe oe LEGEND Cement 9 5/8" FLOAT 9231 FT. y/ 9 5/8" SHOE 9293 FT Diesel 12 1/d HOLE 9332 FT E Y v Kenpak ALL DEPTHS INDICATED ARE DRILLERS DEPTHS BELOW KELLY BUSHING Mud 2 14q DIVISION Of Ott AND 043 ANCHM011 28 27 1 I 1 � PAD 33 12-13 N,E. CDR, I +1 VACATED THIS SURVEY) f PAD Ala' LAT, 70 21' 22.81 .. o � LON6i. 148 °5d 06.96" R x. 643,412 Me, Y= 5,981,3 7 9 33 I 34 VERTICAL HOLE I 33 - 12 - 13 SSCALE= 1" 500' CERTIFICATE OF SURVEYOR 1 hereby certify that I am properly registered and .C`£ OF A(. ? ........, 4 licensed to practice land surveying in the State of Alaska and r.t4,f` ti%+ ry:' 9 that this plat represents n location survey made by me o: rye r t under my supervision, and that all dimensions and other # X 49 :H . » details are corre :.. Y."..,..�.,. O Q`� Oate SURVEYOR NOTE: Plat r>'vlSed IO -ZO-69 PAD 33 -12 -13 area !n YN[yf .• recr.4 5 33 TI2H R43E VYI4T ME410IW ALASY.I Surveyed }ar B-P OIL CORP Surveyed b F M LINDSEY a ASSOC. LAND R HYOROGRAPWC Ss19VEYORS 2!iw ww ne,th— I -imr flo.fe.wd Be* 4 - n8I AM1 ChOt OL]e +� 105 �� o �' c o �*' _ s ` t l M � R t M O ' N O p NN M { r -L 4 t � � r y, w i z � w ,1 w µ v mom t ,� � � �*�" n .x .4 ... or . t � � �'° ik • t � " � � ' may^• JIM oo 41 Vii. f . 7 } \o � ti �� � '„�,� .ter• , 4 y� t a E � r " • a : c- OI w s - n ��: � � '� .,� ��� tea. ;,��• �, K F i +rs " } r z " M a :� ,,. .� . -, a� , .F... �: �,.. � �. .v .. ;�.., %. �� �;. �,��� _� ,� s ,* ..�.. ; �. ;`; +:� �.. ., ¢� h y �� } /b i,� �� `� , ♦:. r � ��'�# �: , 11 t��. R" ;I Ail C Ok a A, o ij 1 *4 �;• iF �' i y �' Y � t3 1 t, a1 1 49 AK r , 4: ,� � � t .� fi R � , g tgt ik ��144j N y i e 4,fM f I t � e ti, _ I NOW _. - :- .. _ _., „_ .. _.. � �� e: ,. -y;. 'mod �x u •rS L ,,a" �. _ ,.. w _ � ,� � _ _.�,� .. � _. .. .:. .._ y R. r .� .. �° a ,.at ,�. ., ., ,,, .. �... ... ,W..- .... . ,. .,. _, ,. - .. _ e . . _ .. -_... a,.H�... ...:....... -� .... = �..wra�""_. ... - -- •�w r+ �"�, .. t .. .. � "rs L. � .. .> #; _ ,. ,. ..., `�... +.. _.x #. _,. >:, �� :;� �' ,er% � ., i v i^ a}. 4'S a a {I M � f � p° x . a ti aw k ;F ,1 - SARAH PALIW, GOVERNOR i ALxA��►pSt�KA �O1IL AND �+E/�1S 333 W. 7th AVENUE, SUITE 100 CO SERVA iICINT COMMSSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 January 29, 2009 FAX (907) 276.7542 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7004 1160 0001 3621 1878 Harry Engel BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Request for Verification of Suspended, Shut -In and Observation Well Information Dear Mr. Engel: This letter supersedes our correspondence of January 28, 2009. Enclosed are lists of suspended, long term shut-in and observation wells operated by BP Exploration Alaska Inc. and BP Alaska Inc. For each list, please verify the information for each well, and provide any corrections by April 1, 2009. Location inspections required under 20 AAC 25.110 should be coordinated with Jim Regg at 907-793-1236 or jim.regg@alaska.gov. If you have any questions regarding this notice, please contact Tom Maunder at 907-793- 1250 or tom.maunder@alaska.gov. Enclosures Sincerely, WAz�� Cathy7.Foerster Commissioner W f CERTIFIED MAIL,,., RECEIPT • (Domestic Mail Only, No Insurance Coverage Provided) c PS Form 3800, June 2002 See Reverse for Instructions ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. • Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: /-/,,v 'P -'VX e / 9PXA7 /dog /9( 2 A. Signatu X /W Agent Addressee B. Re eiv by (Printed_Name)C. Date of De!lvery D. Is delivery ardress cl& ent from item 1? ❑ Ye! If YES, enter delivery address below: ❑ No 3. `Se ice Type IMGertified Mail ❑ Express Mail ❑ Registered -,FMeturn Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (r'ransfer from service label) 7004 116 0 0001 3621 1878 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 J AH(IRAB^t 19519-6612 m Postage $ $0.59 OW Qg ppsT rl C3 Certified Fee $2.70 J �� C3 N C3 C3 Return Reciept Fee (Endorsement Required) $2.20 n g = o X Restricted Delivery Fee ra (Endorsement Required) $0.00 \.pq c PS Form 3800, June 2002 See Reverse for Instructions ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. • Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: /-/,,v 'P -'VX e / 9PXA7 /dog /9( 2 A. Signatu X /W Agent Addressee B. Re eiv by (Printed_Name)C. Date of De!lvery D. Is delivery ardress cl& ent from item 1? ❑ Ye! If YES, enter delivery address below: ❑ No 3. `Se ice Type IMGertified Mail ❑ Express Mail ❑ Registered -,FMeturn Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (r'ransfer from service label) 7004 116 0 0001 3621 1878 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 J Operator Suspended, Shut In and Observation Wells BP ALASKA INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... PRUDHOE BAY 169-068-0 50-029-20036-00-00 PUT RIV 01-10-14 OBSW 9/19/1975 555 FNL 710 FEL Sec 11 T 10 N R 14 E UM 169-069-0 50-029-20037-00-00 PUT RIV 02-10-14 OBSW 9/19/1975 555 FNL 820 FEL Sec 11 T 10 N R 14 E UM 169-070-0 50-029-20038-00-00 PUT RIV 11-10-14 OBSW 9/19/1975 555 FNL 930 FEL Sec 11 T 10 N R 14 E UM 169-059-0 50-029-20033-00-00 PUT RIV 13-10-14 OBSW 9/19/1975 650 FSL 555 FWL Sec 13 T 10 N R 14 E UM 169-062-0 50-029-20034-00-00 PUT RIV 14-10-14 OBSW 9/19/1975 430 FSL 555 FWL Sec 13 T 10 N R 14 E UM 169-081-0 50-029-20043-00-00 PUT RIV 17-10-15 OBSW 9/19/1975 755 FNL 600 FEL Sec 19 T 10 N R 15E UM Thursday, January 29, 2009 Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 'EXPLORATORY 198-252-0 50-089-20027-00-00 RED DOG 1 SUSP 4/2/1999 1682 FSL 4508 FEL Sec 34 T 10 N R 21 E UM ENDICOTT 196-022-0 50-029-22644-00-00 DUCK IS UNIT MPI 1-59/024 SUSP 2/21/1996 3083 FSL 2202 FEL Sec 36 T 12N R 16E UM MILNE POINT 196-009-0 50-029-22642-00-00 MILNE PT UNIT KR B-24 SUSP 3/3/1996 827 FSL 4289 FEL Sec 18 T 13 N R 11 E UM 199-091-0 50-029-21373-01-00 MILNE PT UNIT KR C -12A SUSP 7/13/2003 496 FSL 2027 FEL Sec 10 T 13N R 10E UM 185-110-0 50-029-21364-00-00 MILNE PT UNIT KR C-16 SUSP 10/27/1993 610 FSL 2063 FEL Sec 10 T 13N R 10E UM 196-032-0 50-029-22650-00-00 MILNE PT UNIT KR K-25 SUSP 3/23/1996 3592 FSL 2078 FEL Sec 3 T 12 N R 11 E UM 197-080-0 50-029-22766-00-00 MILNE PT UNIT KR L-34 SUSP 12/1/2008 3285 FSL 5106 FEL Sec 8 T 13 N R 10E UM 201-109-0 50-029-22768-01-00 MILNE PT UNIT KR L -35A SUSP 10/12/2002 3177 FSL 4937 FEL Sec 8 T 13 N R 10E UM 201-075-0 50-029-23012-00-00 MILNE PT UNIT SB 1-13 SUSP 8/19/2001 2346 FSL 1253 FWL Sec 33 T 13N R 10E UM NORTHSTAR 200-211-0 50-029-22996-00-00 NORTHSTAR UNIT NS -26 SUSP 2/1/2001 1298 FSL 648 FEL Sec 11 T 13N R 13E UM 206-138-0 50-029-23325-00-00 NORTHSTAR UNIT NS -33 SUSP 4/26/2007 1369 FSL 650 FEL Sec 11 T 13N R 13E UM PRUDHOE BAY 174-006-0 50-029-20133-00-00 E BAY ST 1 OBSW 10/6/1986 1536 FNL 635 FWL Sec 15 T 11 N R 15E UM 175-059-0 50-029-20177-00-00 GETTY STATE 1 OBSW 5/11/1980 1388 FSL 887 FWL Sec 2 T 10 N R 13E UM 180-092-0 50-029-20504-00-00 PBU MP 11-33-11-12 1 SUSP 4/29/1981 1966 FNL 1380 FEL Sec 33 T 11 N R 12E UM 198-035-0 50-029-22866-00-00 PRUDHOE BAY UN BORE 02-01 SUSP 4/22/1998 453 FSL 4553 FWL Sec 19 T 12 N R 11 E UM 205-010-0 50-029-23245-00-00 PRUDHOE BAY UN BORE 1-100 SUSP 4/17/2006 3219 FSL 3945 FEL Sec 20 T 12 N R 11 E UM 189-075-0 50-029-21959-00-00 PRUDHOE BAY UN LIS 1-3-01 SUSP 9/13/1994 287 FNL 550 FWL Sec 22 T 11 N R 15E UM 189-104-0 50-029-21978-00-00 PRUDHOE BAY UN LIS 1-4-02 SI 12/8/1994 2426 FSL 2176 FEL Sec 24 T 11 N R 15E UM 202-002-0 50-029-22789-01-00 PRUDHOE BAY UN NIA NK -11A SUSP 2/22/2002 1312 FSL 1021 FEL Sec 36 T 12 N R 15E UM 206-031-0 50-029-22668-01-00 PRUDHOE BAY UN NIA NK -14A SUSP 5/4/2007 1358 FSL 944 FEL Sec 36 T 12 N R 15E UM 197-158-0 50-029-22778-01-00 PRUDHOE BAY UN NIA NK -41A SUSP 11/2/1997 1474 FSL 717 FEL Sec 36 T 12 N R 15E UM 202-052-0 50-029-23072-00-00 PRUDHOE BAY UN NWE 04-01 SUSP 4/7/2002 3203 FSL 4003 FEL Sec 20 T 12N R 11 E UM Thursday, January 29, 2009 Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 201-222-0 50-029-23054-00-00 PRUDHOE BAY UN ORIN V-201 SUSP 1/25/2008 4838 FSL 1775 FEL Sec 11 T 11 N R 11 E UM 191-037-0 50-029-22146-00-00 PRUDHOE BAY UN PTM 12 SUSP 4/30/1991 1359 FSL 980 FEL Sec 16 T 12N R 14 E UM 192-082-0 50-029-22283-00-00 PRUDHOE BAY UN PTM P2-55 SUSP 10/12/1992 565 FNL 4052 FEL Sec 14 T 12 N R 14 E UM 176-034-0 50-029-20208-00-00 PRUDHOE BAY UN WBH WBST-03 SUSP 7/26/1976 70 FSL 2000 FWL Sec 25 T 12N R 14E UM 170-040-0 50-029-20076-00-00 PRUDHOE BAY UNIT 01-05 SUSP 5/25/2007 547 FNL 1420 FWL Sec 8 T ION R 15 E UM 200-126-0 50-029-22202-02-00 PRUDHOE BAY UNIT 02-30B SUSP 7/6/2007 154 FNL 774 FWL Sec 36 T 11 N R 14 E UM 195-024-0 50-029-20096-01-00 PRUDHOE BAY UNIT 04-04A SUSP 4/17/1995 916 FNL 382 FEL Sec 34 T 11 N R 15E UM 187-082-0 50-029-21744-00-00 PRUDHOE BAY UNIT 07-27 SUSP 9/4/1994 952 FNL 497 FWL Sec 34 T 11 N R 14 E UM 182-207-0 50-029-20878-00-00 PRUDHOE BAY UNIT 13-98 OBSW 1/17/1983 1405 FSL 361 FWL Sec 13 T ION R 14E UM 201-148-0 50-029-20764-01-00 PRUDHOE BAY UNIT A -25A SUSP 11/22/2001 2651 FNL 1703 FEL Sec 35 T 11 N R 13E UM 178-054-0 50-029-20321-00-00 PRUDHOE BAY UNIT B-10 SUSP 4/10/2008 2070 FNL 1611 FEL Sec 31 T 11 N R 14 E UM 204-139-0 50-029-20654-02-00 PRUDHOE BAY UNIT E -18B SUSP 5/2/2008 1853 FNL 501 FEL Sec 6 T 11 N R 14 E UM 200-163-0 50-029-20600-01-00 PRUDHOE BAY UNIT G -13A SUSP 10/6/2008 2224 FNL 2368 FEL Sec 12 T 11 N R 13E UM 197-190-0 50-029-20487-01-00 PRUDHOE BAY UNIT H -10A SUSP 11/24/1997 1982 FNL 1264 FEL Sec 21 T 11 N R 13 E UM 180-067-0 50-029-20484-00-00 PRUDHOE BAY UNIT H-12 SUSP 7/22/1994 1762 FNL 1264 FEL Sec 21 T 11 N R 13E UM 181-061-0 50-029-20591-00-00 PRUDHOE BAY UNIT H-15 SUSP 10/22/2004 1432 FNL 1265 FEL Sec 21 T 11 N R 13 E UM 169-046-0 50-029-20026-00-00 PRUDHOE BAY UNIT J-04 OBSW 9/19/1975 970 FNL 1245 FEL Sec 9 T 11 N R 13E UM 100-242-0 50-029-21821-00-00 PRUDHOE BAY UNIT OWDW-C SUSP 6/23/1973 651 FNL 1048 FEL Sec 11 T ION R 14E UM 194-144-0 50-029-22522-00-00 PRUDHOE BAY UNIT R-36 SUSP 11/1/2000 782 FSL 3629 FEL Sec 32 T 12 N R 13 E UM 191-123-0 50-029-20765-01-00 PRUDHOE BAY UNIT S -10A SUSP 11/6/1991 1644 FNL 1745 FWL Sec 35 T 12 N R 12E UM 204-071-0 50-029-20804-01-00 PRUDHOE BAY UNIT S -14A SUSP 12/18/2007 1651 FNL 2185 FWL Sec 35 T 12N R 12 E UM 180-108-0 50-029-20511-00-00 PRUDHOE BAY UNIT TR 18-11-12 SUSP 12/24/1980 809 FSL 3893 FEL Sec 7 T 11 N R 12 E UM 180-066-0 50-029-20483-00-00 PRUDHOE BAY UNIT TR 3-10-12 SUSP 10/11/1980 1993 FNL 1479 FEL Sec 33 T 11 N R 12E UM 169-104-0 50-029-20047-00-00 PRUDHOE BAY UNIT TR PR 33-12-13 SUSP 12/20/1969 683 FNL 755 FEL Sec 33 T 12 N R 13 E UM 178-102-0 50-029-20356-00-00 PRUDHOE BAY UNIT TW -C SUSP 4/25/1979 1320 FSL 1321 FEL Sec 3 T 11 N R 12 E UM 192-011-0 50-029-22244-00-00 PRUDHOE BAY UNIT U-01 SUSP 3/16/1992 5134 FNL 2498 FEL Sec 18 T 11 N R 13E UM 204-102-0 50-029-21947-01-00 PRUDHOE BAY UNIT W -09A SUSP 8/7/2006 1437 FNL 1194 FEL Sec 21 T 11 N R 12 E UM 179-031-0 50-029-20369-00-00 PRUDHOE BAY UNIT WGI-01 SUSP 8/28/2006 258 FNL 1209 FEL Sec 11 T 11 N R 14 E UM 188-115-0 50-029-21558-01-00 PRUDHOE BAY UNIT Y -22A SUSP 10/29/1988 1394 FNL 132 FEL Sec 33 T 11 N R 13 E UM 208-140-0 50-029-21883-01-00 PRUDHOE BAY UNIT Y -25A SUSP 11/14/2008 1403 FNL 169 FEL Sec 33 T 11 N R 13 E UM 202-046-0 50-029-22403-01-00 PRUDHOE BAY UNIT Y -37A SUSP 3/31/2002 1425 FNL 276 FEL Sec 33 T 11 N R 13 E UM Thursday, January 29, 2009 Operator Suspended, Shut In and Observation Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 169-014-0 50-029-20011-00-00 SAG DELTA 31-11-16 SUSP 4/28/1969 1102 FNL 1743 FEL Sec 31 T 11 N R 16 E UM 186-056-0 50-029-20138-01-00 W BEACH ST 1-A SUSP 5/6/1986 70 FSL 1880 FWL Sec 25 T 12 N R 14 E UM PT THOMSON 196-008-0 50-089-20026-00-00 SOURDOUGH 3 SUSP 4/24/1996 2245 FSL 5068 FEL Sec 29 T 9 N R 24 E UM Thursday, January 29, 2009 -- All ASEA I SARAH PALIN, GOVERNOR L1i�17 A OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 January 28, 2009 FAX (907) 276-7542 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7005 1820 0001 2499 5951 Harry Engel BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 SCANNED o C T c', 7 2014 Re: Notice of Revised Suspended Wells Regulations and Request for Verification of Suspended and Shut -In Well Information Dear Mr. Engel: Enclosed are the Alaska Oil and Gas Conservation Commission's revised regulations regarding suspended wells (i.e., 20 AAC 25.110). Also enclosed are a list of suspended wells and a list of long term shut-in wells operated by BP Exploration Alaska Inc. For each list, please verify the information for each well, and provide any corrections by April 1, 2009. Location inspections required under 20 AAC 25.110 should be coordinated with Jim Regg at 907-793-1236 or jim.regg@alaska.gov. If you have any questions regarding this notice, please contact Tom Maunder at 907-793- 1250 or tom.maunder@alaska.gov. Sincerely, Cathy P. oerster Commissioner Enclosures It K Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ik Print your name and address on the reverse so that we can return the card to you. s Attach this card to the back of the maiipiece, or on the front if space permits. 1. Article Addressed to: Harry Engel BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519-6612 A. SignWe X (] Agent L� Addressee Addressee B. R eived b ame) Cute of D:Jery x'71 O. Is delivery address different from item 1? 0 Yes If YES, enter delivery address below: ❑ No $. Vrvice Type Certified Mail ❑ Express Mail ❑ Registered –&Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (r-ransfer from service label) 7005 1820 0001 2499 5951 PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 U71 m Harry Engel a r;EAv�Na; BP Exploration Alaska Inc. °'P°Box No, PO Box 196612 ptY stats�ZJPiI _ -- Anchorage AK 99519-6612 U.S. Postal Servicei.r, CERTIFIED MAIL, RECEIPT (Domestic Mail Only: No Insurance Coverage Provided) ou, at www.usps.com For delivery information visit .-bsite mom • U71 m Harry Engel a r;EAv�Na; BP Exploration Alaska Inc. °'P°Box No, PO Box 196612 ptY stats�ZJPiI _ -- Anchorage AK 99519-6612 Operator Suspended and Slut In Wells BP EXPLORATION (ALASKA) INC IYeld Current Date of Permit API Nututwr Well Name Status Status Surface Location.. .. ............. Lease(s).................................. 198-252-0 50-089-20027-00-00 RED DOG 1 SUSP 4/2/1999 1682 FSL 4508 FEL Sec 34 T 10 N R 21 E UM ADL0377013 ENDICOTT 196-022-0 50-029-22644-00-00 DUCK IS UNIT MPI 1-59/024 SUSP 2/21/1996 3083 FSL 2202 FEL Sec 36 T 12N R 16E UM ADL0312828 MILNE POINT 196-009-0 50-029-22642-00-00 MILNE PT UNIT KR B-24 SUSP 3/3/1996 827 FSL 4289 FEL Sec 18 T 13N R 11 E UM ADL0047432 199-091-0 50-029-21373-01-00 MILNE PT UNIT KR C -12A SUSP 7/13/2003 496 FSL 2027 FEL Sec 10 T 13N R 10E UM ADL0047434 185-110-0 50-029-21364-00-00 MILNE PT UNIT KR C-16 SUSP 10/27/1993 610 FSL 2063 FEL Sec 10 T 13N R 10E UM ADL0047437 196-032-0 50-029-22650-00-00 MILNE PT UNIT KR K-25 SUSP 3/23/1996 3592 FSL 2078 FEL Sec 3 T 12 N R 11 E UM ADL0375133 197-080-0 50-029-22766-00-00 MILNE PT UNIT KR L-34 SUSP 12/1/2008 3285 FSL 5106 FEL Sec 8 T 13N R 10E UM ADL0025514 201-109-0 50-029-22768-01-00 MILNE PT UNIT KR L -35A SUSP 10/12/2002 3177 FSL 4937 FEL Sec 8 T 13 N R 10E UM ADL0025514 201-075-0 50-029-23012-00-00 MILNE PT UNIT SB 1-13 SUSP 8/19/2001 2346 FSL 1253 FWL Sec 33 T 13N R 10E UM ADL0025517 NORTHSTAR 200-211-0 50-029-22996-00-00 NORTHSTAR UNIT NS -26 SUSP 2/1/2001 1298 FSL 648 FEL Sec 11 T 13N R 13E UM ADL0312799 206-138-0 50-029-23325-00-00 NORTHSTAR UNIT NS -33 SUSP 4/26/2007 1369 FSL 650 FEL Sec 11 T 13N R 13E UM ADL0321798 PRUDHOE BAY 180-092-0 50-029-20504-00-00 PBU MP 11-33-11-12 1 SUSP 4/29/1981 1966 FNL 1380 FEL Sec 33 T 11 N R 12E UM ADL0047452 198-035-0 50-029-22866-00-00 PRUDHOE BAY UN BORE 02-01 SUSP 4/22/1998 453 FSL 4553 FWL Sec 19 T 12 N R 11 E UM ADL0047446 205-010-0 50-029-23245-00-00 PRUDHOE BAY UN BORE 1-100 SUSP 4/17/2006 3219 FSL 3945 FEL Sec 20 T 12 N R 11 E UM ADL0047446 189-075-0 50-029-21959-00-00 PRUDHOE BAY UN LIS 1-3-01 SUSP 9/13/1994 287 FNL 550 FWL Sec 22 T 11 N R 15E UM ADL0034631 189-104-0 50-029-21978-00-00 PRUDHOE BAY UN LIS 1-4-02 SI 12/8/1994 2426 FSL 2176 FEL Sec 24 T 11 N R 15E UM ADL0028323 202-002-0 50-029-22789-01-00 PRUDHOE BAY UN NIA NK -11A SUSP 2/22/2002 1312 FSL 1021 FEL Sec 36 T 12 N R 15E UM ADL0034629 ADL0034630 206-031-0 50-029-2.2668-01-00 PRUDHOE BAY UN NIA NK -14A SUSP 5/4/2007 1358 FSL 944 FEL Sec 36 T 12 N R 15E UM ADL0034625 197-158-0 50-029-22778-01-00 PRUDHOE BAY UN NIA NK -41A SUSP 11/2/1997 1474 FSL 717 FEL Sec 36 T 12 N R 15E UM ADL0312827 202-052-0 50-029-23072-00-00 PRUDHOE BAY UN NWE 04-01 SUSP 4/7/2002 3203 FSL 4003 FEL Sec 20 T 12N R 11 E UM ADL0047446 ADL0047447 201-222-0 50-029-23054-00-00 PRUDHOE BAY UN ORIN V-201 SUSP 1/25/2008 4838 FSL 1775 FEL Sec 11 T 11 N R 11 E UM ADL0028240 191-037-0 50-029-22146-00-00 PRUDHOE BAY UN PTM 12 SUSP 4/30/1991 1359 FSL 980 FEL Sec 16 T 12N R 14 E UM ADL0375136 Wednesday, Januar, 14. 2009 Operator Suspended and Slut In Fells BP EXPLORATION (ALASKA) INC Field Permit. API Number Well Name Current mate of Status Status Surface Location .................................................... Lease(s)................................,.. 192-082-0 50-029-22283-00-00 PRUDHOE BAY UN PTM P2-55 SUSP 10/12/1992 565 FNL 4052 FEL Sec 14 T 12N R 14 E UM ADL0034622 176-034-0 50-029-20208-00-00 PRUDHOE BAY UN WBH WBST-03 SUSP 7/26/1976 70 FSL 2000 FWL Sec 25 T 12 N R 14 E UM ADL0034627 170-040-0 50-029-20076-00-00 PRUDHOE BAY UNIT 01-05 SUSP 5/25/2007 547 FNL 1420 FWL Sec 8 T ION R 15E UM ADL0028328 200-126-0 50-029-22202-02-00 PRUDHOE BAY UNIT 02-30B SUSP 7/6/2007 154 FNL 774 FWL Sec 36 T 11 N R 14 E UM ADL0028308 195-024-0 50-029-20096-01-00 PRUDHOE BAY UNIT 04-04A SUSP 4/17/1995 916 FNL 382 FEL Sec 34 T 11 N R 15E UM ADL0028324 187-082-0 50-029-21744-00-00 PRUDHOE BAY UNIT 07-27 SUSP 9/4/1994 952 FNL 497 FWL Sec 34 T 11 N R 14 E UM ADL0028309 201-148-0 50-029-20764-01-00 PRUDHOE BAY UNIT A -25A SUSP 11/22/2001 2651 FNL 1703 FEL Sec 35 T 11 N R 13E UM ADL0028286 178-054-0 50-029-20321-00-00 PRUDHOE BAY UNIT B-10 SUSP 4/10/2008 2070 FNL 1611 FEL Sec 31 T 11 N R 14 E UM ADL0028313 204-139-0 50-029-20654-02-00 PRUDHOE BAY UNIT E -18B SUSP 5/2/2008 1853 FNL 501 FEL Sec 6 T 11 N R 14 E UM ADL0028304 200-163-0 50-029-20600-01-00 PRUDHOE BAY UNIT G -13A SUSP 10/6/2008 2224 FNL 2368 FEL Sec 12 T 11 N R 13E UM ADL0028304 197-190-0 50-029-20487-01-00 PRUDHOE BAY UNIT H -10A SUSP 11/24/1997 1982 FNL 1264 FEL Sec 21 T 11 N R 13E UM ADL0028283 180-067-0 50-029-20484-00-00 PRUDHOE BAY UNIT H-12 SUSP 7/22/1994 1762 FNL 1264 FEL Sec 21 T 11 N R 13E UM ADL0028283 181-061-0 50-029-20591-00-00 PRUDHOE BAY UNIT H-15 SUSP 10/22/2004 1432 FNL 1265 FEL Sec 21 T 11 N R 13E UM ADL0028283 100-242-0 50-029-21821-00-00 PRUDHOE BAY UNIT OWDW-C SUSP 6/23/1973 651 FNL 1048 FEL Sec 11 T ION R 14 E UM ADL0028311 194-144-0 50-029-22522-00-00 PRUDHOE BAY UNIT R-36 SUSP 11/1/2000 782 FSL 3629 FEL Sec 32 T 12 N R 13E UM ADL0028279 191-123-0 50-029-20765-01-00 PRUDHOE BAY UNIT S -10A SUSP 11/6/1991 1644 FNL 1745 FWL Sec 35 T 12N R 12 E UM ADL0028257 204-071-0 50-029-20804-01-00 PRUDHOE BAY UNIT S -14A SUSP 12/18/2007 1651 FNL 2185 FWL Sec 35 T 12 N R 12 E UM ADL0385193 180-108-0 50-029-20511-00-00 PRUDHOE BAYd1NIT TR 18-11-12 SUSP 12/24/1980 809 FSL 3893 FEL Sec 7 T 11 N R 12 E UM ADL0028262 180-066-0 50-029-20483-00-00 PRUDHOE BAY UNIT TR 3-10-12 SUSP 10/11/1980 1993 FNL 1479 FEL Sec 33 T 11 N R 12 E UM ADL0047454 169-104-0 50-029-20047-00-00 PRUDHOE BAY UNIT TR PR 33-12-13 SUSP 12/20/1969 683 FNL 755 FEL Sec 33 T 12 N R 13 E UM ADL0028278 178-102-0 50-029-20356-00-00 PRUDHOE BAY UNIT TW -C SUSP 4/25/1979 1320 FSL 1321 FEL Sec 3 T 11 N R 12E UM ADL0028261 192-011-0 50-029-22244-00-00 PRUDHOE BAY UNIT U-01 SUSP 3/16/1992 5134 FNL 2498 FEL Sec 18 T 11 N R 13E UM ADL0028283 204-102-0 50-029-21947-01-00 PRUDHOE BAY UNIT VV -09A SUSP 8/7/2006 1437 FNL 1194 FEL Sec 21 T 11 N R 12E UM ADL0047453 179-031-0 50-029-20369-00-00 PRUDHOE BAY UNIT WGI-01 SUSP 8/28/2006 258 FNL 1209 FEL Sec 11 T 11 N R 14 E UM ADL0028302 188-115-0 50-029-21558-01-00 PRUDHOE BAY UNIT Y -22A SUSP 10/29/1988 1394 FNL 132 FEL Sec 33 T 11 N R 13E UM ADL0028288 208-140-0 50-029-21883-01-00 PRUDHOE BAY UNIT Y -25A SUSP 11/14/2008 1403 FNL 169 FEL Sec 33 T 11 N R 13E UM ADL0028287 ADL002828' 202-046-0 50-029-22403-01-00 PRUDHOE BAY UNIT Y -37A SUSP 3/31/2002 1425 FNL 276 FEL Sec 33 T 11 N R 13E UM ADL0028287 ADL004747 169-014-0 50-029-20011-00-00 SAG DELTA 31-11-16 SUSP 4/28/1969 1102 FNL 1743 FEL Sec 31 T 11 N R 16E UM ADL0028343 186-056-0 50-029-20138-01-00 W BEACH ST 1-A SUSP 5/6/1986 70 FSL 1880 FWL Sec 25 T 12 N R 14E UM ADL0034628 PT THOMSON lVedne.sdnp, _Junta y 1:4, 2009 Operator Suspended and Shut In Wells BP EXPLORATION (ALASKA) INC Field Current Date of Permit API Number Well Name Status Status Surface Location .................................................... Lease(s)................................... 196-008-0 50-089-20026-00-00 SOURDOUGH 3 SUSP 4/24/1996 2245 FSL 5068 FEL Sec 29 T 9 N R 24 E UM ADL0343112 Wednesday, January 14, 2009 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johnston, DATE: Chairman October 26, 1994 THRU: Blair Wondzell,-~' .J~ FILE NO: 'BPXloc. doc P. I. Supervisor FROM: John Spaulding, ~ SUBJECT: Petroleum Inspebtor Ammendment to file 2991jbbd The following wells are in addition to wells mentioned in an earlier report file # 2991jbbd. Term Well C Wellhead on pit still open. PTD 78-102: configuration, site clean, no pressure on tubing or annulus, reserve PBU 3-10-12 Wellhead on pit still open. PTD 80-66: configuration, site clean, no pressure on tubing or annulus, reserve PBU 11-33-1 Wellhead on pit still open. 1-12 PTD 80-92: configuration, site clean, no pressure on tubing or annulus, reserve PBU 33-12-13 PTD PTD 69-104: Wellhead on configuration, site clean, no pressure on tubing or annulus, reserve pit still open. BP EXPLORATION To: David W. Johnston Chairman Alaska Oil & Gas Commission Fro m: Steve Herren, Drlg Mgr Shared Services Drilling ARCO Alaska, Inc. Date' 09/3~L~'§'~-¢ ~ Subject: ,. Suspended wells Compliance with regulations in response to your letter dated August 15, 1994 regarding suspended wells attached are lists detailing well status and criteria for maintaining these wells in a suspended status. Plans for well inspections are in place for October 1 through October 3, 1994 as discussed with Blair Wondzell and John Spaulding. Updated reporting has been filed with the commission as listed. Yours Sincerely, Steve Herren Drilling Manager Bill Bredar Patrick Collins Jim Farnsworth Mike Miller Bruce Policky Scott Sigurdson Marian Sloan RECEIVED ' OCT 1 4 1994 Alaska 0il & Gas Cons. Commission Anchor~ Suspended Well~, Request to retain suspension status The following wells are listed as suspended by the AOGCC under 20 AAC 25.110. These wells are requested to remain suspended for the reason(s) as indicated. Site inspections should be conducted as soon as possible. MPA-01; 029-20376-00 79-/¢04 Potential recompletion in the Kuparuk C and/or B sand as a water injector. Decision hinges on 1994/95 development drilling results (E-13)in this area. MPB-02; 029-20662-00 81-/¢/142 This well is scheduled for initial completion in the Schrader Bluff late this year or early next year. MPA-03; 029-20891-00 83-~001 Future utility as a Schrader Bluff producer with producing utility when surface infrastructure is installed on A pad. MPN-01 B; 029-21053-02 84-0013 N-01 B is a usable well in the Schrader Bluff, with producing utility when surface infrastructure is installed on N pad. The well should be retained in a suspended status until that time. MPC-16; 029-21364-00 85-0110 C-16 has recompletion potential in the Kuparuk "C" sand and/or the Schrader Bluff horizons. Although additional evaluation must be performed to quantify reserves and production potential, C-16 is believed to be a viable workover and/or sidetrack candidate. NWM# 1; 029-22231-00 91-0145 Northwest Milne #1 should remain suspended until the Northwest Milne Point development is better defined. The wellbore is strategically located on a gravel island and may possess utility in either production or injection operations. DNR recently certified this well as capable of production. No Point #1; 029-22450-00 94-0027 No Point #1 will be utilized in the upcoming F- Pad development. Expectations are to complete the Kuparuk "A" zone and commence production 4Q95. Niakuk #4, 029-21217-00 84-0200 Niakuk #4 is requested to remain suspended until the viability of the well for monitoring is defined. Niakuk #5, 029-21290-00 85-0O27 Niakuk #5 should remain suspended for observation purposes at this time. Sag Delta #33-12-16, 029-20176-00 75-0058 Area being drained by 1994 Alapah well NK-26 (HAW). Potential use as a monitor well for this new reservoir Would have to truck oil across winter ice road if resume production Produced 186 MBO in 1985 2 month production test. Sag Delta #5, 029-20527-00 80-0129 Area being drained by L5-26 (high gas well), L5-28, and L5-36 from south to west. Well tests indicated fairly tight, but productive rock; perhaps inadequate stimulation? Costs prohibitive for eventual tie-in to L5 (? via Heald Point). Potential for gas cap monitor well Sag Delta 31-11-16, 029-2001 69-0014 1-00 Area being drained by L4-36, 80 Acre offset to NW. Potential for service well (water injection?) Well is capable of production, but most Lisburne in water leg and costs likely prohibitive for tie-in to L4. Sag Delta #2A, 029-20234-01 77-0069 South of Sag Delta #1, in water leg of Alapah oil accumulation in NK-26 well. Remote potential for pressure monitoring of Alapah offtake and the effect on the Alapah aquifer; though, costs would likely be prohibitive. Sag Delta #8, 029-20519-00 80-0121 Z-32A, 029-21924-01 93-011 3 S-10A, 029-20765-01 91-0123 Sag Delta #8 should remain suspended until the development plan for the area is better defined. This well may possess utility for production or as an observation well. Z-32 was shut in due to high water production in 1992. In 1993 it was sidetracked to a new location. The oil column at the new location was less than prognosed and was not considered economic and the well was suspended. There is oil in the area that can be reached as a new sidetrack from this well. A specific location has not yet been identified, but we wish to retain this wellbore for a future sidetrack. S-10 was sidetracked in 1992. Drilling difficulties were encountered while drilling through a fault in the Kingiak and the well was suspended. There is oil in the area that can be reached as a new sidetrack from this well. A specific location has not yet been identified, but we wish to retain this wellbore for a future sidetrack. The West Sak formation, a non unitized formation in the PBU license area, is reachable from this wellbore. Work in ongoing on a facility sharing agreement. In the case that a satisfactory agreement is reached, this wellbore could be used to access oil in this formation. Y-22A, 029-21558-01 88-0115 Y-22 was sidetracked in 1988. The sidetrack was suspended due to drilling difficulties. There is oil in the region that can be reached as a new sidetrack from this well. A location has not been worked on but we wish to retain this wellbore for a future sidetrack. U-01, 029-22244-00 92-0011 There is oil in the area that can be reached as a new sidetrack from this well. A specific location has not yet been identified, but we wish to retain this wellbore for a future sidetrack. PR 33-12-13, 029-20047-00 69-0104 The well penetrates The West Sak and Ugnu formations in the aquifer. Work in ongoing on a facility sharing agreement with subsequent appraisal of the formations. This well could be used to test the aquifer properties. These wells are listed as suspended, action items are detailed. Ak Island Cf1,289-20018-00 81-0119 Alaska Island #1 was abandoned in 1988. The completion notice has been refiled with AOGCC on 9/15/94. The site is ready for inspection (priority 1 ). Niakuk CflA, 029-20156-01 76-0028 Niakuk #lA was abandoned in 1991. A sundry application requesting status change was filed with AOGCC 9/20/94. A completion notice will follow when the sundry application is approved. The site is ready for inspection (priority 1 ). Niakuk Cf2A, 029-20180-01 76-0079 Niakuk #2A was abandoned in 1991. A sundry application requesting status change was filed with AOGCC 9/20/94. A completion notice will follow when the sundry application is approved. The site is ready for inspection (priority 1). PBU H-01, 029-20099-00 71-0015 The well was drilled in 1971 and hit a down thrown fault block with only 20ft of oil bearing Ivishak. This was not economic at the time. It was left suspended without tubing. Recent success in fraccing the Sag formation indicated that it might be an economic well. A rig workover was completed in April 1994 and the well was put on production 9/94. It is not necessary to inspect this site. Kemik Unit #1,223-20006-00 70-0060 Kemik Unit Cf1 is scheduled to be abandoned in the near future. Abandonment planning is now in progress. Site inspection will not be necessary at this time most likely should be scheduled for Spring of 1995. P2-59, 029-22096-00 90-0140 Arco Alaska Inc. is the operator of this well, they will be addressing the question of suspension. Sag Delta #3, 029-20233-00 79-0080 Well plugged and abandoned March, 1991. Well completion notice will be refiled with the Commission. Sag Delta #4, 029-20245-00 77-0015 Well plugged and abandoned March, 1991. Well completion notice will be refiled with the Commission. The following wells are not under BP Exploration ownership. A letter requesting the owners to respond regarding their wishes for these wells was sent on 9/30/94. MP 03-10-12, 029-20483-00 80-0066 MP 33-11-12, 029-20504-00 8O-OO92 CHEV 18-11-12, 029-20511-00 80-0108 Term C 03-11 - 12, 029-20356-00 78-0102 MP 22-31-11-13, 029-20545-00 81-0010 MP 43-31-11-13, 029-20536-00 80-0139 MP 30-11-13, 029-20546-00 80-0152 ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKE£, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 August 15, 1994 Steve Horton, Drlg Mgr BP Exploration (Alaska) Inc P O Box 196612 (MB12-1) Anchorage, AK 99519-6612 Re: Suspended Wells Compliance with regulations Dear Mr. Horton: BP Exploration and the predecessor Sohio companies have several suspended wells as shown on the attached lists: BP SUSPENDED WELLS PRIOR TO 1980 and BP SUSPENDED WELLS SINCE 1980. The applicable regulation is as follows: 20 AAC 25.110 SUSPENDED WELLS (a) Upon application by the operator under 20 AAC 25.105(e), the commission will, in its discretion, approve the suspension of a well if the well (1) encounters hydrocarbons of sufficient quality and quantity to indicate the well is capable of producing in paying quantities as reasonably demonstrated by well tests or interpretive formation evaluation data; or (2) is reasonably demonstrated to have future value as a service well. For each well on the attached lists of suspended wells, please provide data showing that the well meets the criteria of (1) or (2) above, or advise as to your plans to abandon the well. Wells that meet the criteria of (a) above that you wish to maintain as suspended, as _?~.qui~~_20 AAC 25.110(e), must have well site inspections ~45is ye~r~f~or~f~o snow covering the locations. David W. (..Johnston Chairman Attachments c: Blair Wondzell bew/llbpsusp 8/15/94 BP SUSPENDED WELLS SINCE 1980 PAGE 1 AUGUST 1994 PERMIT 79-0040-0 80-0066-0 80-0092-0 80-0108-0 80-0121-0 80-0129-0 80-0139-0 80-0152-0 81-0010-0 81-0119-0 81-0142-0 83-0001-0 84-0013-0 84-0200-0 85-0027-0 85-0110-0 88-0115-0 90-0140-0 91-0123-0 91-0145-0 92-0011-0 93-0113-0 94-0027~0 API NUMBER 029-20376-00 029-20483-00 029-20504-00 029-20511-00 029-20519-00 029-20527-00 029-20536-00 029-20546-00 029-20545-00 089-20018-00 029-20662-00 029-20891-00 029-21053~02 029-21217-00 029-21290-00 029-21364-00 029-21558-01 029-22096-00 029-20765-01 029-22231-00 029-22244-00 029-21924-01 029-22450-00 WELL WELL WELL NAME CLASS STATUS MILNE POINT UNIT A-01 EXP SUSP PRUDHOE BAY UNIT 3-10-12 DEV SUSP PBU MP 11-33-11-12 I DEV SUSP PRUDHOE BAY U~IT TR 18-11-12 DEV SUSP SAG DELTA 8 EXP SUSP SAG DELTA 5 EXP SUSP PRUDHOE BAY LTNIT 31-11-13 DEV SUSP PBU MP 32-30-11-13 I DEV SUSP PBU MP 22-31-11-13 2 DEV SUSP ALASKA ISLAND I EXP SUSP MILNE POINT LTNIT B-02 DEV SUSP MILNE POINT UI~IT A-03 DEV SUSP MILNE POINT U~IT N-01E DEV SUSP NIAKUK 4 EXP SUSP NIAKUK 5 EXP SUSP MILNE POINT UNIT C-16 DEV SUSP PRUDHOE BAY UI~IT Y-22A DEV SUSP PT MCINTYR~' P2-59 EXP SUSP PRUDHOE BAY UNIT S-10A DEV SUSP NORT~IWEST MILNE i EXP SUEP PRUDHOE BAY UNIT U-01 DEV SUSP PRUDHOE BAY UNIT Z-32A DEV SUSP NO POINT I DEV SUSP STATUS DATE 4/15/so mo/11/8o 4/29181 12/24/80 4/15/81 4/13/81 2/20/81 1/ie/8i 2/14/81 6/08/82 5/27/82 12/10/83 4/27/84 2/17/85 4/10/85 10/27/93 10/29/88 12/22/90 11/06/91 3/30/92 3/16/92 8/31/93 4/08/94 SECT 23 33 33 07 27 36 05 30 30 11 19 23 3O 25 25 10 33 14 35 25 18 19 06 13N 11N llN 11N 12N 12N 10N 11N llN 10N 13N 13N 13N 12N 12N 11N 14N 11N llN 13N RNG 010E 012E 012E 012E 016E 015E 013E 013E 013E 022E 011E 010E 010E 015E O15E 010E 013E 014E 012E 009E 013E 012E 010E u u u u u u u u u u u u u u u u u u u u u u u 8/15/94 BP SUSPENDED WELLS PRIOR TO 1980 PAGE 1 AUGUST 1994 PERMIT 69-0014-0 69-0104-0 70-0060-0 71-0015-0 75-0058-0 76-0028-0 76-0079-0 76-0080-0 77-0015-0 77-0069-0 78-0102-0 API NUMBER 029-20011-00 029-20047-00 223-20006-00 029-20099-00 029-20176-00 029-20156-01 029-20180-01 029-20233-00 029-20245-00 029-20234-01 029-20356-00 WELL WELL WELL NAME CLASS STATUS SAG DELTA 31-11-16 EXP SUSP PRUDHOE BAY Lr~IT 33-12-I3 DEV SUSP KEMIK UI~IT I DEV SUSP PRUDHOE BAY LTNIT H-01 DEV SUSP SAG DELTA 33-12-16 EXP SUSP NIAKUK 1-A EXP SUSP NIAKUK 2-A EXP SUSP SAG DELTA 3 EXP SUSP SAG DELTA 34633 4 EXP SUSP SAG DELTA 28337 2-A EXP SUSP PRUDHOE BAY UNIT TERM C DEV SUEP STATUS DATE 4/28/69 12/20/69 6/17/72 6/22/71 4/28/76 4/30/76 3/30/77 3/23/77 3/22/78 12/27/77 4/25/79 SECT 31 33 17 21 04 26 26 35 35 10 03 TWP 11N 12N 01N 11N 11N 12N 12N 12N 12N 11N 11N R/~G 016E 013E 020E 013E 016E 015E 015E 016E 016E 016E 012E MER U U U U U U U U U U ,> STATE OF ALASKA ' '~ kDn 28278 AL,~"~ ~IL AND GAS CONSERVATION CO~ ....... ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend i Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension E~ Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 2. N~eaOn~aO~r~raska Production Company 5. Datum elevation (DF or KB) RTKB = 48.34' ANSL . 3. Address P. 0. Box 196612~ Anchoraqe, Alaska 99519-~612 4. Location of well at surface 7. 755' WEL, 583' SNL, Sec. 33, T12N, R13E, UM At top of productive interval 8. At effective depth At total depth UnitorProperty name Pru~hoe Bav Unit -- Wellnumber BP 41-33-12-13 Permit number 69-104 9. APInumber 50-- 029-20047 10. Pool Prudhoe Bay Oil Pool feet 11. Present well condition summary Total depth: measured true vertical 9332 feet Plugs(measured) feet Bridge Plug 2523' Effective depth: measured true vertical 9237 feet Junk (measured) feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured None true vertical Length Size 30" Insulated Pipe 20" 13-3/8" 10-3/4" 9-5/8" Tubing (size, grade and measured depth) Cemented Measured depth 150 sacks FOUDU FlY ASH 91'MD 4000 sacks Permafrost 2195'MD 2120 sacks Class G 3982'MD 2416'MD 500 sacks Class G w/10% gel followed by 1000 sacks G (9293-4002'MD) None Packers and SSSV (type and measured depth) Non~ 12.Attachments Description summary of pro~osal [] Detailed operations program Request extension under 20 AAC 3~ le~,~ I '; "3 ~ .R~ ~C"t /'.$. ;i~.,~b', 13. Estimated date for commencing operation True Vertical depth 14. If proposal was verbally approved Reason for extension: This suspended Well is considered for future use as a Prudhoe Bay Unit observation well in the northwest fault block RECEIVED BOP sketch [] Alaska Oil & Gas Cons. Commission Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~,. C,~. ,~~ Title Division Drilling Engineer Commission Use Only Date Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved by ~,eturrt~ ~ Commissioner IApproval No. 7" '~/~ by order of the commission Date ~'C:~ ~ Form 10-403 Rev 12-1-85 Submit in triplicate STATE OF ALASKA · ADL 28278 ALAS .)IL AND GAS CONSERVATION COMI~ ...SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension~Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 2. Na,.r~e of, Operator ~anaara amaska Production Company 3. Address P. O. Box 196612. Anchoraae. Alaska qqfilg-6612 4. Location of well at surface 755' NEL, 683' SNL, Sec. 33, TI2N, R13E, UH At top of productive interval At effective depth At total depth 5. i:~,~m__e I ~,~a.t ~z~' (D~M~rLKB) 6. Unit or Property name PrudhnP. Bay Ilni~ 7. Well number BP 41-33-12-13 8. Permit number 69-104 9. APl number 50--029-20047 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 9332 feet P, I u g s..(i;n ea s ~r_e..d). feet Briage y lug zbzj' RE[EIVED Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured None true vertical Length Size 30" Tnsulated Pipe 20" 13-3/8" 10-3/4" 9-5/8" Tubing (size, grade and measured depth) feet Junk (measured) (~<.i.:"i' ;Y-2 1986 feet Cemented ~J.l,~ " '~lo~b~.fiil&G~s ~ea~~epmA~ch0ra~e~rue vemca~ depth 150 sacks FONDU FLY ASH 91'M~ 4000 sacks Permafrost 2195'MD 2120 sacks Class G 3982'MD 2416'MD 500 sacks Class G w/lO% gel followed by 1000 sacks G (9293-4002'MD) None Packers and SSSV (type and measured depth) None 12.Attachments Description summary of proposal [] Detailed operations program [] Request extension under 20 AAC 25.170('h) 1.2.3.4 13. Estimated date for commencing operation Reason for extension' This suspended well is bein considered for future use as a Prudhoe Bay Unit observation well in the northwest fault block boundary. BOP sketch [] 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~-~'q (~, ~. ~ Title Division Drilling Engineer Commission Use Only Date /O/~. i/E~ Conditions of approval Notify commission so representative may witness I Approval No. ~. ~'/ [] Plug integrity [] BOP Test [] Location clearance Form 10-403 Rev 12-1-85 Commissioner by order of ~~, ,~¢ the commission Date Su~mit j4~"iriplicate July 31, 1986 Telecopy No. (907) 276-7542 Mr. R. S. Allan Standard Alaska Production Company P. O. Box 6612 Anchorage, AK 99502-0612 Re: Extension of Susp'ended Status PBU MP 11-33-11-12 No. 1 PBU MP 22-31-11-13 No. 2 PBU MP 32-30-11-13 No. 1 PBU ~C Tract 3-10-12 PBU~ MP 43-31,11-13 PBU Chevron Tract 23-18-11-12 Sag Delta No. 3 Sag Delta No. 5 Sag Delta No. 7 Sag Delta No. 8 Sag Delta 34633 No. 4 West Sak 25519 No. 17 West Sak 25523 No. 16 West Sak 25655 No. 14 PBU U-13 West Sak 25548 No. 11 West Sak 25645 No. 9 Sag Delta 33-12-16 No. 1 Dear Mr. Allan: A review of our records shows that the above referenced wells are suspended. Section ll0(a) of the regulations states theCommission will, in its discretion, approve the suspension of a well if the well is capable of producing hydrocarbons in paying quantities or is reasonably demonstrated to have future value as a service well. SeCtion 105(e) states that "[e]ach well to be abandoned or suspended must be plugged...to prevent the movement of fluid either into or between freshwater and hydrocarbon sources and to ..prevent all other fluid migration within the well bore." In compliance with Section 170(a) of the regulations, "It]he location of an abandoned well onshore or upon a historically stable island must be clearedwithin one year following well abandonment .... " Section 170(b) provides the means for an extension of time if a valid reason exists, and the well bore is properly plugged. ~-- Mr. R. S. Allan -~-~' July 31 1986 · :"..? Page 2 We are,. therefore, requesting you to submit Form 10-403, Application for Sundry Approval, with a program which will bring the status of these wells into compliance with the new regulations and provide a schedule for this summer when our field inspectors can accompany your representatives to the well sites for location clearance inspection. Please call Harold J. Hedlund at (907) 279-1433 if you have any questions. Sincerely~ ~'~~ Lonnie C. Smith Commissioner jo/A.HJH. 06/07 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 July 22, 1985 Mr. C.V. Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 RE- 1985 LOCATION INSPECTION Dear Mr. Chatterton- In compliance with State Regulation 20 AAC 25.170, attached are Forms 10-403' Sundry Notices and Reports on Wells' for the following wells. These notices request that the wells remain in suspended status. BP 41-33-12-13 BP 22-33-11-13 Term Well B (22-20-11-13) Term Well C (34-03-11-12) Chevron Tract Well (23-18-11-12) MPC Tract Well (21-03-10-12) PBU MP 43- 31-11-13 MPC 11-33-11-12 Getty State #1 (02-10-1 MP Tract Well (32-30-11-13) PBU MP (22- 31-11-13) No. West Sak 25645 #9 West Sak 25548 #11 West Sak 25655 #14 West Sak #16 West Sak #17 Kuparuk State 22-11-12 Sag Delta #1 (33-12-16) Sag Del ta #2A (10-11-16 Sag Delta #3 (35-12-16) Sag Del ta 34633 #4 Sag Delta #5 (36-12-15) Sag Delta #7 Sag Delta #8 Sag Delta #9 Sag Delta #10 Niakuk #lA (26-12-15) Niakuk #2A (23-12-15) Alaska Island #1 Niakuk #4 Niakuk #5 RECEIVED J U L 2 ~ 1985 Alaska 0il & Gas Cons. Commission Anchorag9 Mr. C.V. Chatterton July 22, 1985 Page 2 Sag Delta #11 is now ready for final inspection of the abandoned wel 1. Please advise the undersigned which day during the week of August 19-23 is acceptable for your field inspector to accompany our representative for this annual location inspection trip. Very truly yours, RSA/J~R~/sh 72285:0530N Attachments cc: Well File #17 R.S. Allan Acting SAPC Drilling Engineer RECEIVED J U L ~ ~ 19B5 AtasKa Oil & Gas Cons. Corrlm~'ssi°~ Anchorage . '~ STATE OF ALASKA ALASK .)ILAND GAS CONSERVATION ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator Sohio Alaska Petrole~ ~y 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of Well At surface: 755' ~aSL, 683' SNL, Sec. 33, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Est. KBE = 48' AMSL ADL 28278 7. Permit No. 69-104 8. APl Number 5o-029-20047 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number BP 41-33-12-13 11. Field and Pool ?~ Bay 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: Request extension under SUBSEQUENT REPORT OF: (Submit in Triplicate) 20 ~ 25.170 (]3) 1,2,3 (Submit in Duplicate) Perforate [] Alter Casing [] ~ Perforations I~ Altering Casing Stimulate [] Abandon [:::] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made D Other [] Other [~ Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Reason for exte_nsion: This suspended well is t~ing considered for future Bay Unit develo~_nt. It is not presently on or conneoted to production facilities. RECEIVED J U L 2 4 1985 Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~-,-% - ~ Title District Drillinq Enqineer The space below for Commission use R. H. Reiley Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Approved Copy Rlt/urned/ Submit "lntehtions" in Triplicate Form 10~t03 Rev. 7-1-80 and "Subsequent Reports" in Duplica,e SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 July 10, 1984 Mr. C. V. Chatterton Alaska Oil & Gas Conservation Ccmmnission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: 19 84 LOCATION INSPECTI~ Dear Mr. Chatterton: In compliance with State Regulation 20 AAC 25.170, attached are Forms 10-403,' Sundry Notices and RePOrts on Wells, for the follcwing wells. These notices request that the Wells remain in suspended status o BP 41-33'12-13 BP 22-33-11-13 Te~m Well B (22-20-11-13) Term Well C · (34-03-11-12) Chevron Tract Well (123'18-11-12) ~ Tract Well ('21-03-10-12) PBU MP 43-31-11-13 MPC 11-33-11-12 Getty State #1 (02-10-13) MP Tract Well (32-30-11-13) PBU MP 22-31-11-13) No. 2 West Sak 25645 %9 West Sak 255'48 %11 West Sak 25655 %14 West Sak %16 West Sak #17 Kuparuk State 22-11-12 Sag Delta %1. (133-12-16) Sag Delta %2A (10-11-16) Sag Delta .%3. (35-12-16) Sag Delta 34633' %4 Sag Delta #5 · (36-12-15) Sag Delta %7 Sag Delta '%8 Sag Delta %9 Sag Delta %10 Niakuk %lA (26-12-15) Niakuk %2A (23-12-15) Alaska Island %1 Mr. C. V. Chatterton July 10, 1984 Page Two Long Island Well 91 is now ready for final inspection of the abandoned Well. Please advise the undersigned which day during the week of August 6th is acceptable for your field insPector to achy our representative for this annual location inspection trip to the above-named sites. Very truly yours, District Drilling Engineer cc: Well Files 917 STATE OF ALASKA ~/, ALASKJ~~ )IL AND GAS CONSERVATION-{ JMMISsloN SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL r-I COMPLETED WELL [3 2. Name of O~erator 1. Permit No. Sohio Alaska Petroleua Ccapany 69-104 3. Addre~ 8. APl Number POlX~ 6-612, Anchorage, ~l. aska 99502 so-029-20047 OTHER 4. Location of Well 755' ~EL, 683' SNL, Sec. 33, T12N, R13E, U~4 S. Elevation in feet (indicate KB, DF, etc.) ~'t. KBE= 48' ~ 12. I6. Lease Designation and Serial No. ~ 28278 9. Unit or Lease Name 10. W~ll Number Bt:) 41-33-12-13 11. Field and Pool ~ 0i~ P~ol Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: :Re(:]l,~St ~i(:~ un(]e~ SUBSEQUENT REPORT OF: (Submit in Triplicate) 20 AN2 25.170 (b) 1,2,3 (Submit in Duplicat.) Perforate [:::] Alter Casing I-! , Parforatiofll [:] Altering Casing r'l Stimulate I~ Abandon I"l Stimulation I:~ Abandonment Rl~air Well I-] Change Plans r-i Repair' Made [::] Other Pull Tubing I-} Other I~ Pulling Tubing (Note: Re~ort multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operatiom (Clearly state all pertinent details and give I~rtinant dates, including estimated date of starting any proposed work, for Abandonment lee 20 AAC 25.105-170). This suspended mi1 is being =xmidered for future Prudhoe Bay Unit devel~t. It is not presently on or ~ed RECEIVED JUL 1 0 ].98 Alaska 0il & Gas Cons. Commission Anchorage 14. I hereby certify that the foregc[ing is true and correct to the belt of my knowledge. The l~oace below for Commission use R. H. "~:~e~-- Conditions of Approval, if any: '~J~/~rovecl Cop), RetUrned Suspended status ±s extended unt±l September, 1985. ORIG:NAL SIGNED Approvedby BY LONNIE C. SMITII COMMISSIONER thlCommissiofl Olt. " ' . , ,,, i. -----, , i,'~"'"""'1 Form 10-403 Submit "lntentiortl" in Tripl~atl Rev. ?-1-~0 and "Sub~e¢luent MEMORANUUM Stat of Alaska A . TO: ~~~on ,, DATE: AUgUSt 25, 1983 TRRU: I~nnie C. Smith ~~ ~LENO: 108A=F1 TELEPHONE NO: Commissioner FROM: '~ Edgar W. Sipple, J~~ SUBJECT: Petroleum. Inspector Inspection of Sohio ' s Suspended Locations Listed Below. Monday,_. August 8, 1983: I traveled this date to Prudhoe Bay, Wh6~e I'met with-Mike. Dinger, Sohio representative,' to look at the suspended locations listed below: Sohio' s BP 41-33-12-13 .Sohio's BP 22-33-11-13 Sohio' s Alaska Island Attached to this report are pictures of the well head, drilling pads, reserve pits and a copy of the AOCCC surface suspension location report. It is my recommendation to the Commission that the above loca- tions be accepted in regards to. location cleanup, well sign placement, and pit condition. In summary, I inspected the above listed suspended locations for cleanup, well signs and pit conditions. Attachments 02-00IA(Rev. 10/79) 0~ra' or ~ '~ .~ ~]~~ ~ Address ~~. ~i-~ ;~ ~~o~~ .~ Surface Loc%tion of Well. Fi el d & PoOl '_~,~A~ _:~ Condition of Pad ~XC~.(!~f~ Condition'of Pits Well head -. All outlets plugged Wel 1 sign - ~a~;~L~el 1 head Attached to well guard · Attached to Information correct Ye s No Cellar - -'~ ~ No Ye s ~ C Dye r ed Ye s ~ WaterWell - Plugged off capped Ope n Exp la na ti on Photographs taken to verify above conditions Yes No Explanaton Work to be done to be acceptable ~.. This well and ld~'ation is (acceptable)· (~.=~_~_~~'.le)__~ to be classified as suspended for~.the period of 19__ thru 1~ . InspectedDa bYto :~: ' "~ Revised 8/24/82 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 July 21, 1983 Mr. C. V. Chatterton Alaska Oil & Gas Conservation Cc~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 '1983 'I/DCATION INSPECTION Dear Mr. Chatterton: In compliance with State Regulation 20 AAC 25.170, attached are Forms 10-403, Sundry NotiCes and Reports on Wells, for the following wells. These notices request that the wells remain in suspended status o BP 22-33-11-13 Term Well B (22-20-11-13) Te~m Well C (34-03-11-12) Chevron Tract Well ('23-18-11-12) MPC Tract Well (21-03-10-12) PBU MP 43-31-11-13 MPC 11-33-11-12 Getty State #1 (02-10-13) MP Tract Well (32-30-11-13) PBU MP 22-31-11-13, No. 2 West Sak 25645 #9 West Sak 25548 #11 West Sak 25655 #14 West Sak #16 West Sak #17 Kuparuk State 22-11-12 Sag Delta #1 (33-12-16) Sag Delta #2A (10-11-16) Sag Delta #3 (35-12-16) Sag Delta 34633 #4 Sag Delta #5 (36--12-15) Sag Delta #7 Sag Delta #8 Sag Delta #9 Sag Delta #10 Niakuk #lA (26-12-15) Niakuk #2A (23-12-15) Alaska Island #1 Mr. C. V. Chatterton July 21, 1983 Page TW~ Water Injection Well GC - lB -(13-11-13) is also now ready for final inspection of the abandoned well site. Please advise the undersigned which day during the w~ek of August 8th is acceptable for your field inspector to accompany our representative for thiS annual location inspection trip to the above-named well sites. Very truly yours, R. H. Reiley District Drilling Engineer encs cc: Well Files #17 STATE OF ALASKA i .... ALASt~' DIL AND GAS CONSERVATION( )MMISSlON SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator 7. Permit No. Sohio A~aska Pet~olet~ ~y 69-104 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20047 4. Location of Well At surface: 755' WEL, 683' SNL, Sec. 33, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Est. KBE = 48' AMSL I ADL 28278 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number BP 41-33-12-13 11. Field and Pool Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: ~est extension un~ SUBSEQUENT REPORT OF: (Submit in Triplicate) 20 AAC 25,170 (b) 1,2,3 (Submit in Duplicate) Perforate [] Alter Casing [] ~ Perforations [-I Altering Casing r-I Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Reason for extension: This suspended well is being considered for future Prudhoe Bay Unit 'development. It is ~' presently on or conneoted ~ to production facilities. on .Form No. ~ 'JUL 2 i -.[§B3 N:~$k~)il & Gas ConS. A~c~ragt~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use R. H.~=~iley Date Conditions of Approval, if any.This location was inspected by our representative on August 8, 1983 and clean up was found satisfactory for a suspended location. A subsequent inspection will be necessary by August 1984-. Approved Copy IRIGIIIAL $1ilil[g ~.etumed ,/2''~'~_ Order of Approved by II [I}~Jt ~'-' ,~lJ{~ '" COMMISSIUNEH the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate MEMORANDUM St ate of ALASKA OIL AND GAS CONSERVATION COMMISSION :'' TO: C. ~~atterton Ch~a~ · hru: Lonnie {2. Smith ~¢ C~ss~oner F~OM: ~trolo~ Ins~ctor Alaska. DATE: November 9, 1982 FILE NO: 108/C TELEPHONE NO: SUBJECT: Conduct Clean-up InSpection on Sohio's BP 22-33-11-13 and BP wells Friday,. Au~u~t 27,._ _198_2 - I traveled this date from Anchorage to Prudhoe Bay where I m~t with Jerry Segar, Sohio representative, to conduct clean-up inspections. As the attached pictures show, BP 22-33-11-13 and 41-33-12-13 well locations have miscellaneous debris that will have to be removed before clean-up approval can be granted. In summary, I conducted the clean-up inspection on Sohio's BP 22-33-11-13 and 41-33-12-13 wells. I recommend that cl. ean-up approval not be granted until the debris on. both locations has been removed and another inspection conducted. 02-001 A ( Rev. 10/79.) sUsp~ ed Well and Location Repo'~ 20 LAC 25, ARTICLE 2 FILE INFORMATION: Ope rator ,, , ~_~/d Addre s s Date Suspended Surface Location of Well Permit No. ~/_~_ 7--~ Ft. ~ ~J~: L, _~3_ . Ft. ~ ~ n aPI No. 50 Sec.~_~, T /__~ X/ , a /3 ~, Z~M. Unit or Lease Name ~,~, Well No. · Field & Pool , ~t~/~_~,_/_ ~ ~'. Condition of Pad Well head - Ail outlets plugged No Well sign - Attached to well head Attached to well guard Attached to Yes ~ ~ No Information correct ~ No Cellar - Opened ~ No Fi 1 led Ye s No Cove red Ye s No WaterWell - Plugged off ~ Open Rat Hole Open Yes ~ Fil led Yes ~' Covered ~ No Expla nation Photographs taken to verify above conditions~ No Exp la na ton Work to be done to be acceptable /_~ ...... ~, 6~ ~.~.~mz _ ~._~._ This well and location is (acceptable) (unac_ C_~ptabl~) to be classified as suspended for the period of ~-Z7 19_~__~thru ~g: ~_7_ 19 ~_~. Ins pe ct ed b y: ~ ~ _ /4',,'~_0~_5 / Da te: z~-Z. ?-~_ _ · Revised 8/24/82 MEMORANDUM Sta e of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION c. Commi s sione r FROM: Petroleum Insl~ctor DATE: October 4, 1982 FILE NO: 10 8/E TELEPHONE NO: SUBJECT: Inspect Location Clean-up Suspension Sohio Alaska Petroleum Company Well No. 33-12-13 Sec. 33, T12N, R13E Permit No. 69-104 ~Wedne.sday,_ September !_5,_ !982 - I left Alaska Island, SUbject of another report; to well No. B.P 33-12-13, and took pictures of the location for a suspension. Picture #1 shows the well sign and well head and valves not plugged protruding out of open cellar with fence surrounding it. The well sign also shows Sohio's %., % section designation of the producing interval which ~as not included in the original well permit and completion report. This ~as a 41 added to the. well number. (See A.O.G.C.C. report. } Pictures %2, 3, 4, 5, 6, 7, and 8 show the clean and level condition of the pad with the exception of the open pit and mound of dirt. The mud pit was full of clean water. In summary, I inspected well No. 33-12-13 for Sohio, in the presence of Jerry Sager, Sohio's representative. The location was clean and free of debris. The valves on tree should be plugged or blind flanged. I recommend approval of suspension. Suspended Well and Location Report 20 LAC 25, ARTICLE 2 FI LEI NFORMATION: '-- ~ 6perator ]~/'3/~//) /~-~'/~//4 /m~cr/70~c~'~ .<"dg, Date Suspended Address. ~_~9' B~ ~A~ ~£~ ~/~. Surface L~C~0n ~o~ Weli / ..... Pe~it No. ~ ~_/~' Sec.~3, T~ M , a~ ~ , u~M. unit or Lease Name 33-/2 ;~ ..... Well No. ~p- Field & Pool .~F~D~j~'"~/ ,~ '~ ' Well head - Ail outlets plugged Yes Wel 1 sign - Attached to well head ;%ttaChed to well guard · Attached to Information correct Yes Cellar - ~ e~s No Rat Hole No Cove r ed Ye s No No O~n Yes No Fi 1 led Ye s No Co,red Yes No WaterWel 1 - Plugged off Capped Open Explanation Photographs~taken to verify above conditions O No Explanaton Wor to be done to be acceptable his well and location is (acceptable) (unacceptable) to be classified as us~nded.f0r the ~riod of . 19 thru 19 . ~ Ins~'cted by: ~ed 8/24/82 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265~000 ~ MAIL: POUCH 6-612 ~/I~*~.~/~, ANCHORAGE, ALASKA 99502 C~ · .~ July 30, 1982 Mr. C. V. Chatterton Alaska Oil & Gas ConservationCommission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: In compliance with State Regulation 20 AAC 25.170, attached are Forms* 10-403, Sundry Notices and Reports on Wells, for the following wells. These notices request that the wells remain in suspended status o Sag Delta Sag Delta Sag Delta Sag Delta Sag Delta Sag ~Delta Sag Delta Term Well B (22-20-11-13) Term.Well C (34'-03-11-12) Chevron Tract Well (23'18-11-12) MPC Tract Well (21-03-10-12) PBU MP 43-31-11-13 MPC 11-33-11-12 Getty State #1 (02-10-13) MP Tract Well (32-30-11-13) PBU MP 22-31-11-13, No. 2 West Sak 25645 #9 West Sak 25548 #11 West Sak 25655 #14 West Sak %16 West Sak %17 Kuparuk State 22-11-12 Sag Delta %1 (33-12-16) %2A (10-11-16) %3 (35-12-16) 34633 #4 %5 (36-12-15) %7 #8 %9 Sag Delta %10 Niakuk %lA (26-12-15) Niakuk %2A (23-12-15) AlaSka Island %1 Mr. C. V. Chatterton July 30, 1982 Page TWo We would like to have your field inspector present sometime during the w~ek of August 24 -August 27 to accompany our representative for final location inspection of the following abandoned ~lls: Challenge Island #1 Nechelik 91 Attachments cc: Well Files 917 Very truly yours, R. H. ~iley District Drilling Engineer ECEJYEg Gas Cons, Commission /'~nc:horage STATE OF ALASKA " ALASt<~( ' AND GAS CONSERVATIOI"! ~ ~MISSION SUNDRY' AND ON WELLS DRILLING WELL r-'] COMPLETED WELL E3 OTHER E~ 2. Name of Operator Sohio Alaska Petrole~ Ccapany 3. Address POuch 6-612, Anchorage, Alaska 99502 4. Location of Well At surface: 755' WEL, 683' SNL, Sec. 33, T12N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) Est. ~RF. = 48' AMSL 12. I6. Lease Designation and Serial No. ADL 28278 7. Permit No. 69-104 8. APl Number so-029-20047 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number BP 41-33-12-13 11. Field and Pool Check Appropriate Box T° Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: ~=~]~st e3~ension unde~ SUBSEQUENT REPORT OF: {Submit in Triplicate) 20 AAC 25.170 (b) 1,2,3 Perforate [] Alter Casing [] ~ Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing r-I [] Abandonment [] [] Other r-] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Reason for extension: This suspended well is being considered for future Prudhoe Bay Unit develo~m~ent. It is r~sp~es:e~tly:*on::or conneoted to production facilities. Subsequent Work. Bqpor~ed mi F°ian No. ------- Datecl ---/---~-'- 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ' Title District Drilling Enqinee~' The space below Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date ......... Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ALASKA OIL AND' GAS CONSERVATION COMMISSION April 4, 1979 JAY S. HAMMONO, GOVERNOR ., 3001 PORCUPINE DRIVE-ANCHORAGE, ALASKA 99501 Mr. J. G. Bolm U. S .G. S .-Conservation Division P.O. Box 259 Anchorage, Alaska 99510 Dear John: .Re: Petrographic thin sections prepared from State Well Library Receipt is acknowledged for thin sections from the below listed intervals of the fol~-6-~i'ng~~l-~repared by the U.S.G.S. from core ships provided from the State's Well sample library: (204) ARCO Toolik Fed. #1 10,355 10,339 10,500 10,519 (205) Chevron SOCAL 31-25 9046 9079 9480 (212) ARCO Kup River #1 9232 9287 9377 9414 9445 (230) Sohio PBU J-1 8540 8600 8650 8700 8745 8801 8850 8910 8950 9000 9050 9100 (243) Sohio Put Riv. 337_. 8959 9004 90.50 9256 (278) Sohio PBU N-1 8949 8900 8950 9000 9050 9099 9155 (287) Sohio PBU H-2 8700 8701 8755 8800 8890 8951 9010 9045 9O5O 9125 9201 9246 (297) Ashland W. Channel 1-3 9268 (357) Getty PBS #1 8945 8966 8991 9014 9030 9062 . 9095 9125 J. G. Bolm 2 April 4, 1979 (363) Mobil Kuparuk 30-11-13 9050 9076 We presume that the absence of slides from three of the core chips provided was due to insufficient consolidated material. (278-8800, 287-9150, 363-9094) It is understood that you will be borrowing the slides fo'r examination in your office sometime during mid-summer, 1979. Sincerely, ~,~"~'.~-~-~ \ ..,. .... William Van Alen Petroleum Geologist V BP ALASKA INC. P. O. BOX 4-CCC 121 WEST FIREWEED LANE. SUITE 2'05 ANCHORAGE, ALASKA 99503 TELEPHONE 277-1422 January 19 ,. i970 FILE A-02073 US 7-2~33-12-13 State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Gentlemen': Mr. Thomas R. Marshall,'Jr. Chief'Petroleum Geologist BP PUt 'River '.33"12-13 Enclosed in duplicate Us.Form P-7, '!Well Completion-or ReCOmpletion Report and.Log", for the above ~ell, together with.attaChments as listed on the forTM. ~ery truly yours, hw Enclosures .cc: Operations Coordinator,.NY Operations Manager BP ALASKA INC. BP 33-12-13 API 50.~O29~20047 PERMIT 69-104 WELL HISTORY Dry drilled 36" hole. Ran and cemented 30" conductor at 91' with 150 sacks Fondu/fly Ash. Spudded 17 1/2" hole at 1530 hours, October 31, 1969 and drilled to 2300'. Opened 17.1/2" hole to 26". Ran and cemented 2195' of 20" casing with 4000 sacks Permafrost cement. Cement circulated to surface. Nippled up B.O.P. Drilled 17 1/2" hole to 4000'. Ran 2095' of 16" casing, hung in wellhead and ran 13 3/8" casing to 3982'. Cemented with Class "G" with gel and displaced the two annuli above 2145' with diesel. Cored and drilled to 6000'. Ran logs, opened hole to 12 1/4" and drilled to 8500'. Set 13 3/8" retrievable bridge plug at 3700' and changed B.O.P. Tested new equipment. Drilled and cored to~861~:. Logged and tested. Drilled and cored to 9300'. Opened hole to 12 1/4" and logged. Ran combination~string of 9 5/8" and 10 3/4" cmsing ~to 9293', 10 3/4" D.V. tool at 2293'. 9 5/8" D.V. tool at 4002'. Cement with 500 sacks of Class "G" cement with 10% gel and 1000 sacks of Class "G" with 18% salt. Circulate Kempak from 2293' to surface. Cleaned out to 9192'. Log and set bridge plug at 2500'. Displaced to diesel from 2500' ~o surface. Released rig at 2400 hours, December 20, 1969. CORING CORE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 DEPTH IN 4263 4504 4523 4543 4563 4583 4603 4623 8821 8901 8961 9018 9062 9071 9200 9254 9263 FEET DEPTH OUT 4283 4523 4543 4563 4583 4603 4623 4643 8861 8961 9018 9062 9070 9080 9263 9300 FEET FEET 20 19 20 20 20 20 20 20 40 60 57 44 8 9 54 9 37 RECOVERY 80.0 42.0 95.0 97.5 84.5 94.5 94.5 100.0 95.0 97.0 77.2 77.2 50.0 16.7 0 39.0 0 TESTING DST#1 8819' to 8861' Oxytoma Sand 7000' diesel cushion. Testing time minutes: 1.F. 8, I.S.I.P. 46, FlufF. 45, F.S.I.P. 75 Recovery diesel cushion, 3 barrels sump mud, 11 barrels crude oil Pressure at 8852' BRT psig; initial hydrostatic, Pressure 4812, isip 4412, ifp 2778, ffp 2924, fsip 4391, final hydrostatic pressure 4796. · · VELOCITY SURVEY BP '33-12-13 Casing Wt/Ft Grade Depth (DD) Stages Stage Tools 1st Stage 2nd Stage 3rd Stage 20" 16" 13 3/8" 9 5/8"/10 3/4" Stove Pipe 133/94 K-55/H-40 91' 1 2195' 1 65 H-40 2095' 68/61 K-55 3982' 47/55.5 N-80 2 2145' 9293' 3 4002' 2293' 150 Sacks Fondu/Fly Ash 4000 Sacks -- Permafrost,..5% CFR-2 2120 Class "G" Diesel 4% Gel,.~5% CFR-2 500 Sacks Class "G" w/ 10% Gel, 1% CFR-2 1000 Sacks Class "G" w/ 18% Salt, 1% CFR-2 Mud ~enpak Form P--7 ~ ,-2 SUBMIT IN DUPLICA'I'I~* : SS'AT[~ OF ~t~$K~ ' (See other ln- - ;[~ structions on reverse side) ~ OIL AND GAS CONSERVATION COMMITTEE III I .- iii I IIIII I I ' ' ~'~ ] i i iii WEbL. COgP¢ET OS. RECO PLET O i i ~ la. TYPE OF WELL: 01L ~ ~is wz~ w~ ~ oa~ ~ ot~e~ Appraisal ~b. TYPE OF COMPLE~O~: -' w~L E~ ~cK~ - nESV~. Other~ 2. NAME OF OPERATOR ~, ............ BP., ~S~..~ INC. - ~ ~. ADDRESS OF OPERATO~ 4- P. 0. BOX 4-ccc~ ~CH0~ ,ALAS~ 99~0~ 4. LOCATION 0F WELL (R~O~ ]OC~{o~ C~eG~ ~& {~ ~COO~=~06 ~{g~ a~y S~ Fe, q~{~e~l~flts~ At su~ce 755' WEL, 683' S~, Sec~ion~33, T12N,?R13E, :_~ . At top prod. interval reported below ' ; B. APl NUME~ CODE API-50-029-200/.7 ADL-28278 7. IF LNDIA.H, AJ_J~O~ OR THIBE NA1VI~ 8. UNIT,FAi~VI OR LEASE NAME Put River. 9. WELL NO. BP' 33-112-13 rROD~'~fone , DATE Fii~$T Pi~ODUCTiON I I~ODOCTiON ME'i-HOD (Flowh~g, gas lift, pumping--size and type o£ PumP) ] WELL STATUS (Pwoducing orsnu%-in) DATE Or TEST. ]HOU'~S TF_,Sa'ED /' ]C~OIiE SIZE ]PROD'N FOR OIL--BET. GA,,~--I~CF. WA~B~. ]G~,-O~ ~O , I I ..... ) t TEST WITNESSED ~. ci~ o{~c~s '" ~e!l history, dual induction - Laterolog, 'Baro~d ppm log, Core : . chqn~ J sol well cuttings. ' ', 33. I~.re~ cert~y that~~~"at~d information is eom.ete and cor~et as determined from"alfravailable records ',· SIGNED J~'J [-~~)-~ TITLE Operations Manager DATE 1/14/70 ' H _l I [ ~ ~ Il I ~' *(See Instructions and S~ces [or Additional Data on Revere Side) PERFORA. TIONS OPEN TO PRODUCTION (Interval, size and ngDlber) None : : ; At total depth As .above.~ -, : Sec.. :..33., :T12N,,['..R13E~ UPM ,, 1% PI!~.NIIT'I~O. · 10-31-69 [ 12-15-69;. [ 12-20-69 1~ /,8 Feet:~ .:' . : i-I . ---. .- 18. T~ D~H, ~ & 'TVD~9. ~LUG ~CK MD & ~. ~ ~LTm~ ~L., 7 :;; Im. ::~ ' '"" ",~iivi,~s::~'am.~ ~ :~' .:" ~ J DE~! J ~W ~Y ~ ", ] a0T~h-X TOOLS ...... I CAat~ TOOt, S : 9300 , /F¢ 9t~2 ~ 2500 ,! ~ "'~i .to~ ,. · ~. PRODUCING ~VAL(S), OF ~i~ ~M~TIO~, BOSOM. N~E (~ ~D<~) ~( ,' : J~.'W~ ~O~ one test only~- ~esults enclosed ' ( ' :' :' J no '" ~4.~ ~E ~CT~ ~D OTH~ hOOS..'~UN ' ' ~ .... ~: ') DIL/SP, BHCS/GR. ~L3,,~, ~/~L~ S~/GR/C. FDC/C~ H~ ~ '~ ': . , ~ 16" 65 ~ '. ":~ I H~0 ! 2095' [ , I~bne :,: '~ ,,~ ~, :' " '" :' ' ' " ...... ;"" """" '" '"" ~3-3/8 68161 ,.~ J K55 J 3982 ~7-1/2. J21.0 ~Cl~ss ~ /gel ~5/8"[10-314' 47/5~.5~ ~:1 NO0 [ 9293: ~Z-1/4~';i~ ~}!';~lt~i"/~?~'~g~z,. ~. LINER ~CO~ - 2~. TUB~G ~O~'t INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases in Alaska° Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in cther spaces on this form and in any attachments. Items :20, anJ 22:: If this well is completed for separatc production from more than one interval 'zone (multiple completion), so state in item 20, and i'n item 22 show the prc. Jucing interval, or intervals, 'top(s), bottom(s) and name (s) (if any) for'only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, .for each adc~itional intel vel to be seperately produced, show. ing the adiditional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate" completion report on this form for each' inter,al to be separately produ~. (See instruction for items 20 and 22 above). ~UMMA~Y 0I~' I~'O~,MA'I'ION TESTS INCLUDIN(; INTERVAL TESTED. F'R.~URE DATA AN'D RF, COVI~tlF_~ OF OIL. GAS. 35. G EOL~G lC MARK~ WATER AND MUD . (~ Top Coal 4192' 'f Lower Cretaceous Unconformity 7372 ' Top Oxytoma Sand 8865' · -' Top Shublik 8911 ' Top Sadlerochit 8940' . · COR]~ DATA, ATTACI[ BRIEF DESCRIPITIOI~S OF LITHOLOG'Y. POROSITY. FRACTURES, APP~NT DIPS , , AND DE'FECTEI) SllOWS OF OIL. GAS. OR WATER. See attached sheet : . · · , , , BP 33-12-13 CORE DATA CORE NO. DEPTH 4263-4283' 4504-4523' 4523-4543' 4543-4563' 4563-4583' 4583-4603' 4603-4623' 4623-4643' LITHOLOGY Sandstone grading to siltstone, some clay lenses. Sandstone with interbedded mudstone. Sandstone with interbedded mudstone, locally carbonaceous. Sandstone with interbedded mudstone, occasionally silty. Sandstone with interbedded mudstone, occasionally calcareous cement. Sandstone with interbedded mudstone. Sandstone with interbedded mudstone. Sandstone with coal and mudstone beds. (AVG.) 32% 35% 33% 33% 31% 35% 32% 32% HYDROCARBONS No indications Odor, stain, cut, fluorescence Odor, Stain, cut, fluorescence Odor, stain, cut, fluorescence Odor, stain, fluor- · escence, occasionally cut. Odor, stain, cut, fluorescence Odor, stain, fluor- escence, occasiomally cut. Odor, stain, cut, fluorescence to 4625' 7" DIP Undeterminable Undeterminable Undeterminable Undeterminable Undeterminable Undeterminable Undeterminable Undeterminable BP 33-12-13 CORE DATA CONTINUED CORE NO. DEPTH LITHOLOGY POROSITY (AVG.) HYDROCARBONS DIP 9 8821-8861' Sandstone, silty sandstone and thin limestone beds. 20% Odor, stain, cut, fluorescence Undeterminable 10 8901-8961' Limestone, interbedded shale, siltstone and sandstone. 20% Odor, stain, fluor- escence, occasionally cut. Undeterminable 11 8961-9018' Sandstone and mudstone interbedded. 24% Odor, cut, fluorescence Undeterminable 12 9018-9062' Sandstone, conglomeratic sandstone, mudstone and conglomerate interbedded. 23% Odor, dark stain, pale fluorescence, cut, cut fluorescence Undeterminable 13 9062-9070' Conglomerate 14 9070-9079' Conglomerate 15 No recovery 12% 10% Some heavy viscons stain-Undeterminable lng, poor fluorescence, fair cut and cut fluor- escence. Some heavy viscons stain-Undeterminable lng, poor fluorescence, fair cut and cut fluor- escence, 16 9254-9263' Conglomeratic sandstone. 24% ~V_L~ON OF O~t At~ GA~ Dead oil, tar staining Undeterminable Form No. REV. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN DUPLICATE MONTHLY REPORT OF 'DRILLING AND WORKOVER OPE:RATIONS CO I:IDE TIAL 5. API NUAfERICAL CODE , API 50-020-2004J 6. LEASE DESIGNAi~ION AND SERRIAL NO. ADL-28278 ?. IF INDIA]~T, ALOTTEE OR TRIBE NAME Appraisal 2, N~E OF OP~IIATOR BP AI.~SI~ INC. ADDRESS OF OPERATOR P. 0. BOX 4-CCC, ANCHORAGE~ ALASKA 99503 4. DCA/ION OF WELL 755' WEL, 683' SNL, Section 33, T12N, R13E, UPM 8. I/NIT,F.~RA{ OR LEASE NAME Put River 9. WELL NO. BP 33-12~13 10. FIELD A_ND POOL, OR WILDCAT Prudhoe Bay 11. SEC., T., R., Afl., (BOT'FOM HOLE oB.r~CTIVE) Section 33, T12N, R13E, UPM 12. PERMIT NO. 69-104 13. REPORT TOTAL DEPTH AT END OF MONTH, CI-IA~NGES IN HOLE SIZE, CASING AND CEMEATTING JOBS INCLUDING DEPTH SET A/ND VOLLrNIES USED, PEIIFO.RATIONS. TESTS A1N-D RESULTS. FISHING JOBS, JUNK L~q HOLE A_ND SIDE-TRACKED HOLE AND ANY OTH[ER SIGNIFICANT CH~kNGF~ IN HOL~ CONDITIONS. CONFIDENTIAL December 1-2 . Drilled and cored to 8861 feet, 2-4 Logged and tested. 4-11 Drilled and cored to 9300 feet. 11-18 Opened hole to 12 1/4 inches. Logged. Ran combination string of 9 5/8 in. and 10 3/4 in. casing. 10 3/4 in. to 2416 feet, 9 5/8 in. to 9293 feet,. 10 3/4 in. D.V. @ 2293 feet, 9 5/8 in. D.V. @ 4002 feet. Cement with 500 sacks class "~" cement 10% GEL and 1,000 sacks of class "G" with 18% salt. Placed Kenpack from 2293 feet to surface, 18-20 Cleaned out to 9192 feet'. Ran CBL. Set bridge plug @ 2500 feet. Displaced to diesel. Released rig @ 2400 hours, 12/20/69. s~ ¢~4/ ~ '~ z ~ 0oerations Manamer DA~ January 7. 1970 NOTE--Repo~ on th~s for~ required for each calendar month, regardless of the status o[ operat~o.% with the D~v~s~o. of Mi.es & M~.era[$ by the 15th ~ the succeedl.9 month, un[e~ othe~$e BP OIL CORPORATION P. O. BOX 4-1395 ANCHORAGE, ALASKA 99503 DATA DISPATCH to: New York/London/Sunbury TO: DATE: We enclose the following data: Signed: Petroleum Engineering Department PoE.2/Dec 68 Form No. P---4 REV. ., STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY RE!PORT OF 'DRILLING AND WORKOVER OPERATIONS Appraisal 1. OXL [] GAS [] OTHER WELL WELL SUBMIT IAI ]DI/PLICATE 2. NAME OF OPERATOR BP ~LASKA INC. 3~ AD~)RESS OF OPER2~TOR P. 0. BOX 4-CCC; Ar%ehorage: Alaska 99.503 4. t,OCA~O~ O,F 755' WEL, 683'SNL, Section 33, T12N, R13E, UPM %. APl NU~EmCAL ~ODE "~ API 50.029-20047 6. LEASE DESIGNATION AN'D SERIAL NO. AI~L-28278 7, IF INDIAA~, ALOTTEE 0]~ TRIBE NAME S, LrNIT,F.~RA([ OR LEASE NAME Put River 9. w~:i~L NO. · .BP :q2-1 ?..1 2 10. FIELD A-~D POOL. OR WILDCAT Prudh ma Bay 11. SEC.. T., R., M.. (t~O'I'FOM HOI-,E o~mcrwE) Sec 33, T12N~ R13E, UPM 12. PERMIT NO. 69-104 13. REPORT T'OTAL D~IP~ AT F2qD OF MONTH. CI~La--NGES IN HOLE SIZE. CASING AD C~2VIE/~TING JOBS INCLUDING DEPTH SET A/Xr~ VOLLrMES USED PERFOI:L~TIONS. TESTS ANT) i:LESULTS. FISHING JOBS. JLrNK IN HOLE A/~D SIDE-TI:LACKED HOLE AND A_~Y OTHER SIGNIFICAlNIT ~GF_~ rN HOLE CONDITIONS. November 1969 1- 5 6- 8 9 - 10 11 - 16 16 - 21 21 - 23 23 - 28 28 - 30 CONFIDENTIAL Drilled 17-1/2" hole from 378' to 2300' opened to 26". Ran and cemented 2195' of 20" casing with 4000 sacks permafrost cement nippled up B.0.P. Drilled 17-112" to 4000'. Ran 2095' of 16" casing set slips and ran 3982' 13-3/8" casing cemented with. Class ~ gel displaced the 2 annuli above 2145' with'., diesel. Cored and drilled to 6000'. Ran logs and opened hole to 12-1/4". Drilled 12-1/4" hole to 8500'. Changed B.0.P. ~iVI$1ON OF OIL AND ~J~ICI'iORAGE 14_ I hereby certify SIGNED ~TU~ Onerat4 one M~a~ar DA~ DecemBer ] 2. 1969 NOTE--Repo~ on this form is required for each calendar month, regardless of the status of operations, anO mu~ ~ filed in dupJi~t¢ with the Division of Mines & Minerals by the 15th of the succeeding month, unless othe~ise dire~ed. A-01567 US 7-2-33-12-13 BP ALASKA INC., Operator for P. o. sox 4-ccc BP Oil Corporation 121 WEST FiREWEED LANE, SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE 277-1422 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 A'ttn: Mr. Homer Burrell, Director Gent lemen: BP 33-12-13 Enclosed in triplicate is Form P-3 advising of our intention to suspend the above named well pending design of production facilities and downhole com- pletion arrangements. HJC/gk Enc. cc: Mr. P. Hardwick Very truly yours, BP ~SKA INC. Operator for BP OiL ~or~6~a~io~ OperatTbns Manager DEC 1 01 '9 . , STATE OF ALASKA S~bm/t "Intentions" in Triplicate & "Subsequent Reports" in Duplicate OIL AND GAS CONSER'VATIO,N CO,MMITTEE SUNDRY NOTICES AND REPORTS 'ON W'ELLS (Do not use this torrn for proposals %0 drill or to deepen or plug back to a di£fierent reservOiel Use "APPLICATION FOR P~ITm" for such proposals.) OIL [] GAS WEL~ WEL~ .,__ OT~ER Appraisal 2. NAME OF OPERATOR BP ALASKA INC. .. 3. ADDRESS OF OPERATOR P. O. Box 4-CCC, Anchorage, Alaska 99503 4. LO:CATION O,F WELL At surface 755' WEL, 683' SNL, Section 33, T12N, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc. HLB ~. API'N~dAJ~ CODE -,~ ! A?I 50 029 20047 i. ~E D~GNA~0N ~D SE~ NO. ~L-28278 ~', iF ~I~, ~OT~ OR ~. UmT, F~ OR ~SE Put ~. ~L~O. BP 33-12-13 10. F~ ~D ~OOL, O~ ~'P~udhoe :Bay ~I. SEC.;,T., R., ~., ~BO~M O~E~IVE) Sec 33, ~T~;2N~ ~13E 12;. P~T NO. 69'104 Ch~ck Appropriate Box To I~nd;i'cate Nlat'ure of N~fice:, Re,pOrt, or~'Other Date NOTICE OF INTENTION TO: ,~ EUBSEQUENT REPORT OF: · FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TR~,~TMENT ]~J . .ALTERING CASING __ SHOOT OR ACIDIZE [ J ABANDON* 8HOOTINGtOR ACIDIZINO ~ ' ABANDONMEI~T* (Other) ';:( ~';, "['i . .. REPAIR WELL CHANGE PLANS i . '' ,. ' I J (No~: <Re~rt:r'es~ts'"of multtpl~ eomp~tion on Well ~ Other) S~pe~d Completion br Recompletion Report and ~g form.) , ...... . . . , 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and giv,:~ pertinent;da:tes.' ,including estimated date of starting an)' proposed work. We propose to suspend our s~ject well pending~d~sign of production facilities and downhole comple~ion arrangements. ~" ~-" ~. ~e well will not now be drilled to the ~is~issipp~an bu~ will ta~ina~e in the Triassic. ~- : Well status will be as foll~s: Total Depth Last Casing Cemented with: A bridge plug will be set at about 2500' above which the tain diesel. The casing will not be perforated. Approximately 9,300' in 12-I/4" hole. 10-3/4"/9-5'/8" N80 Seal'L°ck, at T,.D. 500 sacks Class G/gel,~and.ii,,,lOOO sacks Class G/salt through the shoe. 400 SackS. Ciass~~ G/gel through a stage tool at 4000', ?'~}~:': casin~ SIG~D ,~~~/ ,~'.' d~ (Thi. ,pace for State o~ce,~ CONDITIONS OF'APP~OVAL, See Instructions On Reverse Side · ,i~-Froved Copy Returned F~rm No. P--4 STATE OF ALASKA SUB~rr IN OIL AND GAS CONSERVATION COMMITTEE MONTHLY RE!PORT OF ~DRILLING AND WORKOVER OPE:RATIONS Appraisal 1. WELL 2. NAME OF OPEP,.ATOR B~ AT.ASKA INC. 3. ADDRESS OF OPERATOR 'P. 0. BOX 4-CCC, Anchorage~ Alaska 99503 4. LOCATION O'F W~LL 755' WEL, 683' SNL, Section '33, T12N, R13E, UPM ~. AP1 N~¢EmCAL CODE API 50-029-20047 6. LEASE DESIGNA~ON AND S~IAL NO. ADL-28278 7. IF INDIA]~, ALOTTEE OR TRIBE NAME 8. I3~'IT,F.A~:bM OR LEASE NA3~E Put River 9. %VELL NO. BP 33-12-13 10. Fi~:Lr~ A. ND POOL. OR WILDCAT _~ Prudhoe n. SEC., T., a., M., (aOm'OM HO~ OBJEcTr~_.~ Sec 33, T12N, R13E, UPM 12. PgF,.MIT NO. 69-104 13. REPOI~T TOTAL DKPTH AT END OF MONTH, CIrIA~NGES IN HOLE SIZE, CASING AND CE1ViF, NTING JOBS INCLUDING DEPTH SET ~ VOLLrNIES USED, PERFO~TIONS, TESTS ANT) RESULTS. FISHING JOBS, JLrNK' IN HOLE A_ND SIDE-TRACKED HOLE A. ND ANY OTHER SIGNIFICANT CI-tAN,~ES IN HOL~ CONDITIONS. October 1969 21 - 30 31 CONFIDENTIAL Moved from BP 18-10'15. Dry drilled 36" hole. Ran and cemented 30" conductor at 91' with 150 sacks Fondu/Fly Ash. Spudded 17½" hole at 1530 hrs. October 31, 1969. Drilled to 378' mGN~ ,,, di. _- T~Z Operations Manager z,AT~ November 13, 1969 NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed. BP ALASKA INC. P. O. BOX 4-CCC 12! WEST F1REWEED LANE, SUITE 205 ANCHORAGE, ALASKA 995'03 TELEPHONE 277-1422 November 3, 1969 OPERATOR FOR BP OIL CORPORATION A-01346 US 7-2-33-12-13 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer Burrell, Director Gentlemen: BP 33-12-13 Enclosed in triplicate is Form P-3 advising of our intention to change the casing program on the above well from that outlined in our original application, together with a schematic diagram of the revised casing program. Very truly yours, BP ALASKA INC. OPERA~D~pF~OpyfBP OIL CORPORATION Operations Manager hw Enclosures cc: Mr. P. Hardwick NOV 1969 ~IYLSl0N OF 0IL AN~ , t I~'V. 9-3~-67 STATE OF ALASKA ~m~l~nit "I~atentkms" in T~iplicm~e & "Su~)~ecluent Reports" in Duplicate OIL AND 'GAS CONSERVATION: COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir Use "APPLICATION FOR PERNIIT--" for such proposals.) OIL [] GAS W;LL WEL~ [] o',,~E.R Appraisal 2. NAME OF OPERATOR BP ALASKA INC. 3. ADD/LE$.q OF OrE17~TOR P.0. Box 4-CCC, Anchorage, Alaska 99503 4. LOCATION O,F WELL At surface 755' lt, rEL, 683' SNL, Section 33, T12N, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GE, etc. Estimated KBE 50' 14. OKG - - ~. API NUtHERICAL CODE 50-029-20047 HWX ...... ~. ~ D~S~6N~=O~ A~D ~L 28278 · ~. [F ~I~, ~T~ OR ~IB 8. UNITr FM OR LEASE NAME Put River 9. WELL NO. BP 33-12-13 10. F~'i.,D AND FOOL, OR WILDCAT ': Prudhoe Bav 11. SEC., T., R., M.. (BOTTOM HO,lB OBJECTIVE) - Se~' 33, T12N, R13E, UPM . 12. PER1VIIT i~O. 69-104 Check Apprepriate Box To [ndiG~te NJat'ure of I~ti~e~ Re ~ert, or ,Other Date NOTICE OF INTENTION TO: TEST WATER SHUT-0FF ~ PULL OR ALTER CASING ~ FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE J: ABANDON' REPAIR WELL CHANOE PLANS 8UBBEQU:ENT REPORT OF: WATER SHUT-OFF : REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT' (Other) (NOTE: Report results.'0f multiple eompl~ti0n on Well (Other) Com.~tetion or Recompletion Report and L,og form ) 15. DESCRIBE pROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including .estimaf~l date of starting any proposed work. · The following alterations have been made to the casing, program, in order ~5 provide a method for refrigeration against permafrost conditions' should a haZard proved to exist in the future. 'The method allows circulation of a ref~±~erarit in the annulus between 20" and 13-3/8" casings by virtue of the 16" divider string. The 9-5/8" casing will be cemented to surface, but in add±rion the 9-5/8" will be swedged out to 10-3/4'I from just below the permafrost zone fn order that another annulus may be supplied by the insertion of a 7" string to the base of ~the permafrost for in- sulation purposes. (See attached schematic drawing). The following alterations are therefore necessary to our approVed apPlication. (Permit #69-104 dated October 27, 1969). PLEASE SEE ATTACHED PAGE ~_fl_SION OF O1[ AND GAS --TITLE OPERATIONS MANAGER OCT. 31~ 1969 5~ DATE See Instructions On Reverse Side ~pproved Copy ,Returned DELETE Size of Hole Size of Casing Wt. per Ft. Grade Setting Depth 36 30 Stove Pipe 50 26 20 133/94 J55/H40 2200 17-1/2 13-3/8 68/61 K55 4000 12-1/4 9-5/8 47 N80 9500 BP 33-12-13 Quantity of Cement 250 sacks Permafrost 4000 sacks Permafrost 3000 sacks G in two stages 1100 sacks G/salt; 1100 sacks G/gel; mud Dry bucket 36" hole to about 50 feet below ground level. Cement 30" conductor to sur- face with Permafrost cement. Drill 26" hole to about 2200 feet and cement 20" casing to surface with Permafrost cement. Drill 17-1/2" hole to '4000 feet and cement 13-3/8" casing in two stages with Class G cement. Drill 12-1/4" hole to about 9500 feet amd Cemmnt 9-5/8" casing in three stages with Class G/salt, Class G/gel and thixotropic mud on third stage. Drill 8-1/2" hole to total depth at about 9900 feet. Blowout preventer program will be 2000 psi equipment from 20" casing point and 3000 psi equipment from 13-3/8" casing point. INSERT Size of Hole Size of Casing Wt. per Ft. Grade Setting Dep th ~6 30 Stove Pipe 90 26 20 133/94 J55/H40 2200 16 65 H40 2100 17-1/2 13-3/8 68761 K55 4000 12-1/4 10-3/4/9-5/8 55.5/47 N80 9500 Quantity of Cement 250 sacks Permafrost c. 4000 sx Permafrost Uncemented inside 20" casing c. 3000 sx Class G in stages c. 1100 sacks G/salt, 1200 sacks G/gel in stages BP 33-12-13 Dry bucket 36" hole to about 70 feet below ground level. Cement 30" conductor to sur- face with Permafrost cement. Drill 26" hole to about 2200 feet and cement 20" casing to surface with Permafrost cement. Drill 17-1/2" hole to 4000 feet, hang 16" casing and cement 13-3 in stages with Class G cement o¥ 1969 ~lW~-~ OF O~t AN~ ~/~ Drill 12-1/4" hole to about 9500 feet and cement 10-3/4"/9-5/8" casing in stages with Class G/salt and Class G/gel. Drill 8-1/2" hole to total depth at about 9900 feet. Blowout preventer program will be 2000 psi equipment from 20" casing point and 5000 psi equipment from 13-3/8" casing point. I! c. 2100 ' TOC c. 2150' 20" or 18-5/8" c. 2200' 7" c. 2250' 10-3/4" c. 2300' , ' t 13-3/8" i. · . Mr. H. J. 'Clarke Operations Manager' BP Alaska Incorporat.ed P. O. Box 4-CCC ',i i" Anchorage, Alaska9~B503 ANCHORAGE 99502, October 30, 1969 Re: Put River BP 33-12-13 BP Alaska Inc., Operator Dear Mr. Clarke' ' In reference to the subject drill-site, the following stipulations are required to preserve and protect fish and game resources' 1. Prior to the start of drilling, a gravel pad of thickness sufficient to prevent degradation of permafrost will be constructed. 2. Access to this site will be only by an all-season gravel road or by aircraft. 3. Prior to the beginning of drilling, a sump of sufficient size to contain all waste fluids will be constructed. This sump must be lined with material impervious to oil and oil products at all seasons during the year. Prior to abandonment of the site, the sump must be cleaned of oil and covered. 4. The operator must dispose of all waste, including garbage, by burning, with non-combustible material and unburned residue disposed of in a manner and in a location acceptable to the Alaska Department of Fish and Game, i.e., in some locations burial may be necessary, in others removal from' the site may be required. 5. Sewage and waste water will be disposed of by lagooning or the cesspool-septic .tank method. No stream or body of water will have any sewage or waste water added to it. 6. At no time will streams be blocked to fish movement. 7. The Habitat Biologist's Office, lOl8 !.!est International Airport Road, Anchorage, Alaska 99502, will be notified prior to closing of this 1 ~ ~' . o~a ~10~l Statement- The foregoing provisions do not relieve the lessee and/or his contractors or assignees of any responsibilities or pro~'isions req~,~ red by law or regulation of the State of Alaska or the federal government. ~.~c~v ~ours/, cc' Burrel I rel~ . Denton [%~. ~ . Lentfer Habitatl/Bio!oqist ' · ~r 2~, !969 ~r $1r~ Encl~ Is ~ 'a{~p~ appl tetlofl for permit ~ drl t I the a~ve ~1i., on or ~ .~r 27, i~9, at a locnflon In 'Section ~i~ws elfin. ~~ of FI~ ~ ~, 1018 Each electrt¢ 109, septa, and print, filed ~t to AS 31.0~.0~ ond the ~llcable regu~ taflons, shell Inet,de the celll~tton fil. e ami the ,eelaelcal zero pos!t-lens of att log traces, both before amd after the I09 ran. Each Io9 strut I sho~ al ! format date Including (I) type of f I,ld In the hole, (2) chmages In mud type and additional sables, (~) scale clmn~s, (4) eq, lpemat data. amd (~) mtul~t used. In the event of suspension or ~, pi.ease notify this office Idequal~ly Iff advm so that ~ ~r/ ~ a witness present. Very truly yours, Homer L. Buffet I, ~ I Alaska 011 and Gas Con--tie ~losure cc= Del~t of FI~% omi C~ w/o enct. hp~t of Labor v/o encl. BP 33-12-13 Dzy bucket 36" hole to about 50 feet below ground level. conductor to surface with P~rost cement. '2 19 .q,, ~J_VI~iON OF 01£ AND GAS Cement 30" Drill 26" hole to about 2200 feet and cement 20" casing to surface with Permafrost cement. Drill 17-1/2" hole to 4000 feet and cement 13-3/8" casing in two stages with Class G cement. Drill 12-1/4" hole to about 9500 feet and cement 9-5/8" casing in three stages with Class G/salt, Class G/gel and thixotropic mud on third stage. Drill 8-1/2" hole to total depth at about 9900 feet. Blowout preventer program will be 2000 psi equipment from 20" casing point and 3000 psi equipment from 13-3/8". casing point. A-01332 ,) BP ALASKA iNC. P. O. BOX 4-CCC 12I WEST FIRE:WEED LANE, SUITE 205 ANCHORAGE. ALASKA 99503 TELEPHONE 277-1422 October 23, 1969 State of Alaska Department of Natural Resources Division of 0il and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Thomas R. Marshall, Jr. Chief Petroleum Geologist Gentlemen: BP 33-12-13 Please find the following enclosed herewith: 1. Application for permit to drill the above well on the Arctic Slope, Alaska 2. Three copies of surveyor's plats showing the location. of the proposed well. 3. Check in the amount of $50 to cover the permit filing fee. We shall be grateful if you will process this application as quickly as possible, as we propose to begin drilling operations shortly. HJC:cc Enclosures Very truly yours, BP 4LAS~. /7 Operations Manager ~IVI~I~I OI~ OIt ANI~ OAS, SUBMIT IN T~ TE Fornl 'P--1 (Other instruetto .~ reverse side ) REV. 9-30.-~ ~!¥1510N oI~t~T~A~LASKA 'APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK DRILL ~ DEEPEN ~ PLUG BACK ~ OIL ~ oas Q SINGL~ ~ MULTIPI,E ~ ~. ~*~ o~ oP~o~ BP ALASKA INC. 3. ADDRESS O~ OP~rOR P. 0. BOX 4-CCC, ANCHORAGE, ALASKA 99503 4. LOCATIO1N OF WELL At surface 755' WEL, 683' SNL, Section 33, T12N, R13E, UPM At proposed prod. zone As above 13, DISTANCE IN MILES AND DIRECTION FiiOM NEAREST TOWN OR.POST OFFICE* Approximately 100 miles N.E. of Umiat ]4. BOND II, FORMATION: State of Alaska DL-11 TYPE Blanket surety and/or No. Federal Insurance Co. 8016-77-14 15. DISTANCE FROM PROPOSED* i16~ ,NO. OF ACi~ES IN LEASE LOCATION TO NE*REST '4525' frcm west- 1 PROPERTY OR LE^SE LIN--..' of (Also to nearest dr(g, unit, if any) ern ouunu~ 2560 18. DISTANCE FROM PROPOSED LOCATION* lease h~. PROPOSED DEPTH TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. ' 9900' 8800 SSE of AROD-H~la Kup ^P I 50-029-20047 6. LF_~SE D~ISIGNATION A/%rD S~:IlAL NO, ADL 28278 I. IF INDIAN, AI.,LOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NA/VIE Put River 9. WELL NO. BP 33-12-13 10. FIELD AND POOL. OR WILDCAT Prudhoe Bay 11. SEC., T.. R.. M. (BOTTOlV[ HOLE OBJECTIVE) Sec 33, T12N, R13E, UPM ~o,,-, $100,000 17. N~O. ACRES ASSIGNED TO THiS WELL 20. ROTARY OR CABLE TOOLS 21. ELEVATIONS (Show whether DF, RT, CR. etc.) Estimated KBE 50 ' 0C~nh~.r 25: 1969 23. PROPOSED CASING AND CEMENTING PROGRAM Rotazy 22. APPROX. DATE WOHK WILL START* ., SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRAI)E SETTING DEPTH ~ QUANTITY O~ CgMEN~ ., .. 36 30 Stove 'Pipe 50 250. sacks P~st ' 26 20 I 133/94 J55/H4t 2.200 4000 sacks Perma6rost 17-1/2 13-3/8 6~./61 K55. 4000 3000 sacks G in two st.aq~s 12-1/4 q-K/R 47 NRa -qqa0 ] l tiff .~a~.ka C~/.~a]t: ] 100 sacks Geological Prognosis: Tertiary and Quaternary Jurassic and Cretaceous Triassic Mississippian Gravels, sands and clays Surface - 3800 ' Mudston~s and sandstones 3800 - 8620' Sandstones, shales & ~tones 8620-9510' Cazix)nates and shales 9510 - 9900 ' TD IN ABO~E SPACE DI~I~ E~ RAM: If p~posal is to deepen or plu~ back, give data on present productive zone and proposed new productive zg~eFe~F pj;~pos~/s to drill or deepen direetLonally,, give pertinent data on s~bsurface locations and measured and true vertical depths. ~l~/.~.,~/It ~l~enter program. SIGNED'" 'H . J/:"~;~F~~. ~ DAT~ ~ 24, 1969 -m-,.-. Op~ations Mqr.. (This space /or State office I SAMPLE~ AND CORE CHIPS kYE~ [] NO DIRECTIONAL SURVEY [] YES XNO CONDITIONS OF APFROVAL, IF AN-Y: SEE TRANSMI~AL LETTER ,.P.,. ~=~c~ coo=~ ~ O q ~ *~ Indmcttons On Reverse Side October 27, 1969 O*~ October 28, 1969 28 PAD 33 300' 300' - VERTICAL HOLE 33-12-13 I .I ANCHORAGE 27 PAD 33-12-13 N.E. COR. (LOCATED THIS SURVEY) LAT. 70° 21' 22.81" LONG. 148°50' 06.96 X: 643,412 Y: 5,981,379 ~4 SCALE: I": 500' CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, and that all dimensions and other details are correct. Date SURVEYOR NOTE: Plot revised 10-20-69 PAD $$-12-15 L,~oted in 4.w. V4_of prOfmcted Sec $3,TIZN, RISEiUMIAT ME Surveyed for B-P OIL CORP. Surveyed by F M. LINDSEY 8~ ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevord Box 4-081 Anchoroge Alosko CHECK LIST FOR NEW WELL PERMITS Yes bio Remarks 1. Is well to be locateU in a defined pool ................ '. 2. Do statewide rules ~ply ........................ .. 3. Is a registered sur~ey plat attached .................. 4.~'~s well located pro, er distance from property line ........... -- 5. Is well located pro~er distance from other wells ............ ~/ 6. Is sufficient undedicated acreage available in this pool ........ , 7. Is well to be deviated ......................... 8 I perat the 'ly ffected party . s o or on a ................... v 9. Can permit be approved before ten-day wait ........... . . . . ~/ ,, ,, , 10. Does operator have a bond in force ................... ~/ 11. Is conductor string provided ...................... 12r~'~I~s enough cement useU to circulate on conductor and surface ...... ~ _ 13. Will cement tie in ~rface and intermediate or production strings . . . ~ ...... 14. Will cement cover all possible productive horizons ........... 15. Will surface casing cover all fresh water zones ............ 16. Will surface csg. internal burst equal .5 psi/ft, to next string .... 17. Will all casing give adequate safety in collapse and tension ...... ___ ~ _ 18. Does BOPE have sufficient pressure ~ating ............... Ad ~t~onal Requ,rements. ~~~~~~~ ~ ~ ~~ _ Approval ~eco~ended: KLV