Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-124
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-20C Wellhead Sealant Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-124 50-029-21716-03-00 14295 Conductor Surface Intermediate Liner Liner 9020 80 2907 3126 7496 3924 11165 20" 13-3/8" 9-5/8" 7" 4-1/2" 8994 28 - 108 28 - 2978 26 - 3152 3040 - 10536 10367 - 14291 28 - 108 28 - 2746 26 - 2869 2790 - 8530 8376 - 9021 None 520 2670 4760 5410 7500 11165, 12720, 13245 1530 5380 6870 7240 8430 10550 - 13760 4-1/2" 12.6# 13Cr80 24 - 10373 8543 - 9027 Structural 4-1/2" HES TNT Packer 10251 8269 Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281, 0028284 24 - 8382 IC void in wellhead at Surface Pump 1-cup Greenstick. Final pressure = 0 psi. 294 Well Not Online 32470 43 450 200 260 1400 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 10251, 8269 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:45 am, Aug 20, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.08.20 06:09:12 - 08'00' Torin Roschinger (4662) DSR-9/11/25J.Lau 11/4/25 RBDMS JSB 082125 ACTIVITY DATE SUMMARY 7/28/2025 T/I/O = SSV/770/690. Temp = si. Bleed IAP & OAP (pre greenstick). ALP = Disconnected @ C spool. IA FL @ 7564' (sta #2, SO). Bled IAP to OT to 0 psi in 7 hrs. IA FL unchanged. OA FL @ 100'. Bled OAP to BT to 0 psi in 20 min (gas). No monitor. Installed ball valve jewelry on IC test void for greenstick application. Final WHPs = SSV/0/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:45 7/30/2025 T/I/O = SSV/0+/50. Temp = SI. Greenstick IC test void. ALP = Disconnected @ C spool. Rigged up to IC void and pumped 1/2 gun of liquid greenstick into IC void. Held pressure for 1 hr to ensure good pack. Ball valve jewelry left on IC void. SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:30 Daily Report of Well Operations PBU J-20C 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-20C Pull Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-124 50-029-21716-03-00 14295 Conductor Surface Intermediate Liner Liner 9020 80 2907 3126 7496 3924 11165 20" 13-3/8" 9-5/8" 7" 4-1/2" 8994 28 - 108 28 - 2978 26 - 3152 3040 - 10536 10367 - 14291 28 - 108 28 - 2746 26 - 2869 2790 - 8530 8376 - 9021 None 520 2670 4760 5410 7500 11165, 12720, 13245 1530 5380 6870 7240 8430 10550 - 13760 4-1/2" 12.6# 13Cr80 24 - 10373 8543 - 9027 Structural 4-1/2" HES TNT Packer 10251 8269 Bo York for Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281, 0028284 24 - 8382 N/A N/A 294 Well Test Not Available 32470 43 200 150 1400 150 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 10251, 8269 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:31 am, Jul 02, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.07.01 09:46:52 - 08'00' Bo York (1248) RBDMS JSB 071025 JJL 7/21/25 ACTIVITY DATE SUMMARY 6/21/2025 *** WELL S/I ON ARRIVAL *** TAGGED TOP OF PATCH @ 10545' MD w/ 3.76 GRING *** WSR CONT ON 6/22 *** 6/22/2025 *** CONT FROM 6/21 *** JAR ON PATCH @ 10545'MD w/.125 FOR 4HR 40MIN SWAP TO .160 PULLED BAKER FLO-GUARD PATCH FROM 10545' MD *** WSR CONT ON 6/23 *** 6/23/2025 *** WSR CONT FROM 6/22 *** PULLED 4-1/2" TBG STOP FROM 11130' MD, LARGE CHUNKS OF METAL IN TBG STOP MADE MULTIPLE UNSUCCESSFUL ATTEMPTS TO MAKE IT INTO DEPLOYMENT SLEEVE w/ 2-7/8" BLB, GRING SETUP LOADED TBG WITH 185 BBLS CRUDE, AND 180 BBLS SEAWATER *** WSR CONT ON 6/24 *** 6/23/2025 T/I/O= 2415/217/216 Assist Slickline (PROFILE MODIFICATION) Pumped 185 BBLS Crude down the TBG to kill the well. Pumped 180 BBLS Seawater down the TBG to kill the well. **JOB CONTINUED ON 6-24-25** 6/24/2025 *** WSR CONT FROM 6/23 *** LRS KILLED WELL (ON VAC) ***WRS CONTINUED ON 6-25-25*** 6/24/2025 **JOB CONTINUED FROM 6-23-25** Assist Slickline (PROFILE MODIFICATION) Pumped 110 BBLS Seawater down the TBG as directed. Pumped 40 BBLS Crude down TBG for Freeze Protect. FWHP's 363/228/274 DSO notified of well status upon LRS departure. Tag hung on Master. **Well Control Drill** 6/25/2025 *** WELL S/I ON ARRIVAL *** RAN 2.58'' MAG TO DEP SLV @ 11165'MD (NO REVOVERY) RAN 1.75'' CENT TO DEVIATION @ 11212'SLM/11221'MD RAN 1.84'' CENT TO DEP SLV @ 11165'MD, UNABLE TO WORK PAST. RAN 4-1/2'' BLB w/3.79'' G-RING TO DEP SLV @ 11165'MD SET 4-1/2" MONO-PAK LTP WITH 2-7/8 XX PLUG INSTALLED ON TOP OF DEPLOYMENT SLEEVE @ 11165' MD *** WSR CONT ON 6/26 *** 6/26/2025 *** WSR CONT FROM 6/25 *** POLLARD 63 RIG DOWN *** WELL LEFT S/I ON DEPARTURE *** Daily Report of Well Operations PBU J-20C 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-20C Patch Liner Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-124 50-029-21716-03-00 14295 Conductor Surface Intermediate Liner Liner 9020 80 2907 3126 7496 3924 12720 20" 13-3/8" 9-5/8" 7" 4-1/2" 9027 28 - 108 28 - 2978 26 - 3152 3040 - 10536 10367 - 14291 28 - 108 28 - 2746 26 - 2869 2790 - 8530 8376 - 9021 None 520 2670 4760 5410 7500 12720, 13245 1530 5380 6870 7240 8430 10550 - 13760 4-1/2" 12.6# 13Cr80 24 - 10373 8543 - 9027 Structural 4-1/2" HES TNT Packer 10251, 8269 10251 8269 Stan Golis Sr. Area Operations Manager Josh Stephens Josh.Stephens@hilcorp.com 970.779.1200 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281, 0028284 24 - 8382 N/A N/A 716 614 23602 22526 105 58 275 675 1548 1541 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations t to the best of my know February 1, 2023 By Meredith Guhl at 3:11 pm, Feb 01, 2023 RBDMS JSB 020723 PBU J-20C 210-124 Plug Perforations Patch Liner PRUDHOE BAY, PRUDHOE OIL N/A DSR-2/1/23 Sundry Number WCB 11-7-2023 ACTIVITY DATE SUMMARY 1/17/2023 ***WELL FLOWING ON ARRIVAL*** (Patch tubing liner) RU POLLARD UNIT # 60 ***CONTINUED ON 1/18/23 WSR*** 1/18/2023 T/I/O= 2480/383/189 TFS unit 4 Assist SL (Brush & Flush) Pumped 181 bbls crude down TBG to assist SL with a B&F. FP FL with a total of 8 bbls 60/40 and 40 bbls crude per West side recipe. SL In control of well upon TFS Departure. 1/18/2023 ***CONTINUED FROM 1/18/23 WSR*** (Patch tubing liner) BRUSH & FLUSHED TBG DWN TO STOP @ 11130' MD w/ FULL BORE BRUSH & 3.79" G-RING T-BIRD PUMPED 181 BBLS CRUDE FOR BRUSH & FLUSH DRIFT TBG TO STOP @ 11130' MD w/ 36' x 45KB DMY PATCH DRIFT (no issues) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** 1/19/2023 T/I/O=650/357/323 (PATCH TUBINGF / LINER) Assist E-Line Pumped 65 bbls 180* crude down TBG. Final T/I/O=283/356/349 Left well in E-Line control. 1/19/2023 *** Well SI on arrival. *** Initial T/I/O = 500/350/300 RU Eline and Baker patch. OAL = 41' LIH', MAX OD 3.7" Encounter dogleg at 3200 ft. RU Pumpers and pump 65 bbl hot crude, get through dogleg, correlate and verify w/ town engineer, set patch w/ good indication 2225 / 1460 lb tension before and after setting patch. POOH, confirm patch has set, RDMO. Patch set at 10545 - 10580 ft, ME-ME. Well is freeze protected and SI on departure. Final T/I/O = 200/350/300 *** Job Complete *** Daily Report of Well Operations PBU J-20C gg RU Pumpers and pump 65 bbl hot crude, get through dogleg, correlate and verify w/g ggg y town engineer, set patch w/ good indication 2225 / 1460 lb tension before and after gg setting patch. POOH, confirm patch has set, RDMO. (g) BRUSH & FLUSHED TBG DWN TO STOP @ 11130' MD w/ FULL BORE BRUSH & 3.79" G-RING T-BIRD PUMPED 181 BBLS CRUDE FOR BRUSH & FLUSH DRIFT TBG TO STOP @ 11130' MD w/ 36' x 45KB DMY PATCH DRIFT (no issues) RU Eline and Baker patch. The new liner patch is shown at the correct depth on the new WBS, below. -WCB Patch set at 10545 - 10580 ft, ff g Pumped 181 bbls crude down TBG to assist SL with a B&F. 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-20C Wellhead Sealant Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-124 50-029-21716-03-00 14295 Conductor Surface Intermediate Liner Liner 9020 80 2907 3126 7496 3924 12720 20" 13-3/8" 9-5/8" 7" 4-1/2" 9027 28 - 108 28 - 2978 26 - 3152 3040 - 10536 10367 - 14291 28 - 108 28 - 2746 26 - 2869 2790 - 8530 8376 - 9021 None 520 2670 4760 5410 7500 12720, 13245 1530 5380 6870 7240 8430 10550 - 13760 4-1/2" 12.6# 13Cr80 24 - 10373 8543 - 9027 Structural 4-1/2" HES TNT Packer 10251, 8269 10251 8269 Stan Golis Sr. Area Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281, 0028284 24 - 8382 At Surface, in IC Wellhead Void 2-cups of Greenstick packing 620 903 6865 20501 350 100 1025 125 1444 1565 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Anne Prysunka at 9:56 am, Jan 05, 2023 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2023.01.04 18:06:29 -09'00' Stan Golis (880) DSR-1/6/23 N/A Wellhead SealantRepair Well WCB 10-23-2023 PRUDHOE BAY, PRUDHOE OIL Sundry Number PBU J-20C 210-124 ACTIVITY DATE SUMMARY 12/11/2022 T/I/O = 1480/10/10. Temp = 112*. Re-treat IC void w/ Greenstick (Eval IAxOA). No AL. Bled IAP & OAP to BT to 0 psi in 30 min, hold open bleed. Remove LDS from the 12:00 position and install modified LDS. Pumped 1 gun load of GreenStick/Self mold plastic into the IC test void for re-treat. Re-installed factory LDS. SV = C. WV, SSV, MV = O. IA & OA = OTG. 17:00. 12/24/2022 T/I/O = 1400/100/100. Temp = 109°. Bleed OAP to 0 psi (Eval IAxOA). No AL. Bled OAP to BT to 0+ psi in 2 min (gas). 30 min monitor. OAP increased 20 psi. Final WHPs = 1400/100/20. SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:45 Daily Report of Well Operations PBU J-20C STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________PRUDHOE BAY UNIT J-20C JBR 12/21/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:3 Test with 2-7/8 TJ, C1, K1 and K2 F/P on low PT all 3 greased and cycled and retest passed. Accumulator bottles 12 @ 1000 psi precharge. Test Results TEST DATA Rig Rep:Colt Pace/C. GreubOperator:Hilcorp North Slope, LLC Operator Rep:A. Haberther/R. Gallen Rig Owner/Rig No.:Hilcorp ASR 1 PTD#:2101240 DATE:11/5/2022 Type Operation:WRKOV Annular: 250/3000Type Test:WKLY Valves: 250/3000 Rams: 250/3000 Test Pressures:Inspection No:bopKPS221108184917 Inspector Kam StJohn Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 11.0 MASP: 2430 Sundry No: 322-471 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 0 NA Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 16 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 11"P #1 Rams 1 2 7/8 x 5"P #2 Rams 1 Blinds P #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2 1/16"FP HCR Valves 1 2 1/16"P Kill Line Valves 2 2 1/16"FP Check Valve 0 NA BOP Misc 0 NA System Pressure P3020 Pressure After Closure P1760 200 PSI Attained P17 Full Pressure Attained P58 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P4 @ 2218 ACC Misc NA0 NA NATrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P22 #1 Rams P5 #2 Rams P5 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill NA0 FP FP Test with 2-7/8 TJ, C1, K1 and K2 F/P on low PT all 3 greased and cycled and retest passed. Accumulator bottles 12 @ 1000 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-20C Extended Perf w CTU, Install AICD Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-124 50-029-21716-03-00 14295 Conductor Surface Intermediate Liner Liner 9020 80 2907 3126 7496 3924 12720 20" 13-3/8" 9-5/8" 7" 4-1/2" 9027 28 - 108 28 - 2978 26 - 3152 3040 - 10536 10367 - 14291 28 - 108 28 - 2746 26 - 2869 2790 - 8530 8376 - 9021 None 520 2670 4760 5410 7500 12720, 13245 1530 5380 6870 7240 8430 11550 - 13760 4-1/2" 12.6# 13Cr80 24 - 10373 9032 - 9027 Structural 4-1/2" HES TNT Packer 10251, 8269 10251 8269 Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281, 0028284 24 - 8382 N/A N/A 102 909 7874 8000 42 402 0 1044 163 1399 322-471 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations the best of my knowled December 9, 2022 By Anne Prysunka at 12:29 pm, Dec 09, 2022 DSR-12/9/22 RBDMS JSB 121222 WCB 11-29-2024 ACTIVITY DATE SUMMARY 9/24/2022 ***WELL S/I ON ARRIVAL*** PULL 4-1/2 EVO-TRIEVE PLUG @ 10711' SLM ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE*** 10/6/2022 CTU #9 2" Coil Tubing / Job Scope = Mill XN, Set CIBP, Extended ADDPerf MIRU CTU #9 ***Job In Progress*** 10/7/2022 CTU #9 2" Coil Milling XN w/Left handed BHA assembly, Set CIBP, Extended ADDPerf. Make up 3.80" left handed milling BHA w/string reamer. Load well w/safelube and RIH. Mill out XN @ 10,361' to 3.80". POOH. BD LH BOT milling assembly (Gauge 3.81" Go / 3.80" NO GO string mill / Centailzer). MU BOT MHA & HES Mem Tools w/ 3.70" DJN. RIH to 12,800'. Log up to 12,700' paint white flag. Log up 50 fpm to 11,000'. POOH and tie in logs. M/U BOT 3.593" CIBP, RIH ***Continued on 10/8/22*** 10/8/2022 CTU #9 2" Coil Milling XN w/Left handed BHA assembly, Set CIBP, Extended ADDPerf. M/U BOT 3.593" CIBP, RIH and set at 12,720, Bullhead well kill 1.5x, POOH maintain fluid pack. BD BOT tools. Cut 52' 2" chrome management. Change stripper. MU BOT MHA. No Flow good - pump across top well - Deploy 18 guns 2.75" HES / 200' of perfs - MU FH - RIH - tag CIBP and correct depth to 12,718.22'. PUH to btm shot @ 12,630'. pump 5/8" stell ball. perfed @ 48.2 bbls @ 2950 psi (perf 12,430' - 12,630') POOH pumping displacement. Lay down run #1 perf guns and deploy Run #2. RIH ***Continued on WSR 10/9/22*** 10/9/2022 CTU #9 2" Coil Milling XN w/Left handed BHA assembly, Set CIBP, Extended ADDPerf. RIH w/ gun #2. RIH to plug for depth correction. Perf interval 11910'-12110'. POOH. NO FLOW - un-deploy guns #2 - deploy guns #3 (120', 60' blanks, 130' in 15 picks), RIH Tag CIBP @ 12,720'. Correct Depth. PUH to Btm shot @ 11,860'. Pump 5/8" ball around. Perf @ 11,550'-11,680' & 11,740'-11,860'. POOH, Un-deploy run #3 guns, Freeze protect well with 41bbls Diesel. Start BOP Test ***Continued on WSR 10/10/22*** 10/10/2022 CTU #9 2" Coil Milling XN w/Left handed BHA assembly, Set CIBP, Extended ADDPerf. BOP Test and RDMO ***Job Complete*** 10/27/2022 T/IA/OA= 50/0/0. Temp=100. (Pre Rig Load and KIll). Pumped 2 BBLS of 60/40 and 300 BBLS of 1% KCL down TBG. Followed load with 2 BBLS of 60/40 and 38 BBLS of DSL down TBG for Freeze protect. 10/27/2022 Check for pressure, RIH, set 4" HCTSBPV (#4-3). N/D tree (DX seal stayed in THA). Clean void, inspect lift threads. (void was completly dry no indication of any test fluid). Install CTS plug. R/U test equipment and test plug to 4m for 5 min. R/D test equipment. Install BX160. Install 13 5/8" x 11" DSA. Install new R54. N/U BOP as per ASR tool pusher. 10/28/2022 T/I/O=BPV/0/0. RD Tree & THA. RU BOP'S. Torque to API specs. Final WHP'S=BPV/0/0. JOB COMPLETE. Daily Report of Well Operations PBU J-20C Perf interval 11910'-12110'. POOH @ (perf 12,430' - 12,630 @@ Perf @ 11,550'-11,680' & 11,740'-11,860'. POOH Daily Report of Well Operations PBU J-20C 10/28/2022 Continue rigging down Asr. Blow down all fluid lines and disconnect. Bleed down accumulator lines and disconnect. Rig down tongs and rig floor equipment. Disconnect HCR lines. Clean and suck out pits.,Secure sheave arm to derrick. Pull rack pins. Drop guy lines. Knife over mast. Lower mast onto headache rack.,Move Rig to A-Pad Warehouse for Routine Maintenance. With Crane support Lift Rig Floor onto Transport Trailer. N/D BOP Stack. N/ Tree. Test Void to 500 low / 5000 high for 5/10 min. Baker done Final Checks on Tech- Wire Continuity.,Load well house onto Transport Trailer. Pick up Rig Mats around well # B-35. Continue to load out Rig Equipment to J-20,Transport the Pit Module and the Trailer with the Well House & Rig Floor to PBU J-20 . Transport Rig to J-20 The Gravel Pad Behind well # J-20 was not adequate to support the Rig Well House. Spent 2 hours adjusting the rig mats and cribbing up the mats to support the Rig Well house. Spot the Mud Boat. Spot Pit Module into position. Spot Tool Pusher and Company Man Office into position. The Crane Operator Stopped the job due 27 MPH Winds Gusting to 30 mph. Well monitor wend reading before Proceeding. 10/29/2022 Waiting on wind to slow down so we could make crane picks. Wrap koomey lines and install heat. Preformed maintenance on choke and kill manifold. spot back up generator. snow removal around pad. Install cellar containment,Crane flew in well hut, rig floor. place tongs on rig floor. rig up stairs to rig floor. nipple up spacer spools and flow spool. pick up HCR line and spot into place. Fly heater behind well hut.,Spot rig onto mud boat place heaters to warm up hydraulics. Run electrical to rig from floor and pusher shack. Install Koomey lines onto stack.,Level and secure the Rig to the Mud Boat. Continue to Rig Up all Services. Install Winterization around the rig. Take on 40 bbl. Fresh water in pits for testing. Take on 150 bbl. Seawater in the pits for work over. Take on 320 bbl. Seawater in the outside upright tank.,Observed the Door Hinge on the BOP Stack Leaking Hydraulic Oil. Unable to do a Field Repair. Called out the Crane to Change out the BOP Stack. Nipple Down BOP Stack. With Crane Support Fly the Rig Floor off and onto the ground. Fly the failed BOP Stack off onto the BOP Cradle. Fly the Spare BOP Stack on and Nipple everything back up. Fly the Rig Floor back into position.,Raise the Mast and secure. Install racking pins. Install Staircase to the Rig Floor. R/U the equipment on the floor. Hook up all lines and interconnects. N/U Riser and Flow Spools. Install Bird Bath. Continue to work on Rig Acceptance Checklist. Daily Report of Well Operations PBU J-20C 10/30/2022 Continue to R/U ASR. N/U spacer spools and flow spool. install flow line. winterize all fluid lines. troubleshoot Glycol unit with boiler tech. Function test BOPs. make up 2- 7/8 test joint. rig accepted at 10:00 AM. Pick up test joint . Fill stack and get ready for testing BOPs,Test BOPs with 2-7/8 test joint to 250 low/ 3000 high as per approved sundry. Holding each test for 5/5 Charted Minutes.,R/D Testing Equipment and Blow Down All Lines,P/U Tee Barr and pull CTS Plug and BPV. Fill the hole with 17 BBL. Seawater. Use Continuous hole fill after filling. Losing 10 BPH to the formation.,Rack And Tally 2-3/8" Liner. Make up the 2-7/8" Safety Joint.,Pit Module Gas Alarm System Reading 3% LEL. Observe Gas Breaking out at surface. Called OE and decided to Bull Head 1- 1/2 x well Bore Volume of Seawater. Pump in 250 BBL 8.5 ppg Seawater to the Formation 3.5 BPM at 1400 psi. Pumps off, Flow Check Well, Losing 30 BPH of Seawater to the formation.,Start Picking up 2-3/8" AICD Liner Continuous hole fill, losing 30 BPH to the formation 24 Hour Fluid loss to the Formation = 430 BBL. 10/30/2022 Pull CTS plug, (well on vac) Pull 4" HCTSBPV. 10/31/2022 Continue picking up 2-3/8 AICD Liner as per Program Detail. Found bad threads on 2 blast joints and one XO blast joint. laid down and swapped out with spares.,Finish picking up 2-3/8" AICD Liner as per Well Tech Rep. to 1572',RIH with 2-3/8" AICD Liner on 2-7/8" PH6 Work String F/ 1572 T/ 6800' at report time. Use Continuous Hole Fill Losing 25 BPH 24 Hour Fluid Loss to the Formation = 600 BBL. Total Fluid Loss For The Work Over = 1030 BBL. Daily Report of Well Operations PBU J-20C 11/1/2022 RIH with 2-3/8" AICD Liner on 2-7/8" PH6 Work String F/ 6,800' T/ 11,180' Use Continuous Hole Fill Losing 25 BPH,Tag obstruction, set down 10k, P/U to neutral weight set down 16k. Inform OE, Decision made to line up to bullhead down tubing & IA Continue filling hole at 25 BPH,Service Rig & change out crews, While lining up to pump. Install TIW & kelly hose to tubing.,PJSM on change of work & parameters limits with crew & service reps.,Shut bag & Obtain parameters bullheading down tubing F/ 1 BPM 780 psi T/ 1.5 BPM = 1200 psi No pressure observed on IA. Shut down pumps & attempt to work string down. S/O to 22k traveling down 10' Restart pumps with bag open no returns to surface while pumping down tubing. Continue at 1.5 BPM 1200 PSI & attempt to work down, ( No Progress) P/U to 93k (NO Progress),Line up to Bullhead down IA Obtain parameters bullheading down IA F/ 1 BPM 980 psi T/ 1.6 BPM = 1800 psi Pressure observed on tubing P/U to 93k & attempt to work string up, ( No Progress),Contact OE Decision made to pull String to max of welltech packer Stay below on yield of 511 wedge. P/U to 130K, Liner free W/ 96k p/u wt Begin POOH,POOH with 2-3/8" AICD Liner on 2-7/8" PH6 Work String F/ 11,180' T/ 9,184' P/U WT 74k Use Continuous Hole Fill Losing 25 BPH 11/2/2022 Continue POOH with 2-7/8 PH6 and AICD liner seeing 4-5K drag for the first 2000' pulled with constant weight and then started slowly going down.,Rig service. Mechanic force regen the rig.,Continue POOH to 1572' and prep to lay down 2-3/8 AICD liner,L/D Liner BHA. Insect all components for damage or unusual wear. All blast joints need inspection & re-threading. Damaged while breaking out. Incurring delays & extra time process bad joints ensuring thread damage minimal for laying down with lift subs Damaging lift subs with bad Blast joint, Blast joints are "slick" no upset and need lift subs/ lift nubbins. Slight damage on welltech packers elements.,Service rig,Con't L/D Liner BHA. Insect all components for damage or unusual wear. All blast joints need inspection & re-threading. Damaged while breaking out. No issues breaking out 511 wedge,Remove Handling equipment & BHA components from rig floor. Tally PH6 for clean out run. Pick Clean out Assy. Daily Report of Well Operations PBU J-20C 11/3/2022 Service rig, check fluid levels on rig,Finsh picking up BHA, & organizing floor.,RIH w/ clean out assy. on 2-7/8" PH6 work string. T/ 7,097' Using constant hole fill losing 20 BPH. P/U WT 56k , S/O WT 35 k,RIH w/ clean out assy. on 2-7/8" PH6 work string. F/ 7,097' T/ 10,386' Using constant hole fill losing 20 BPH. P/U WT 95k , S/O WT 38 k No issues passing thru X nipples & XN nipple. No S/O & P/U wt changes. Con;t to tag CIBP,RIH w/ clean out assy. on 2-7/8" PH6 work string. F/ 10,386' T/ 12,712' Using constant hole fill losing 20 BPH. P/U WT 116k , S/O WT 35 k Tag CIBP set 5k wt down 2x. (JT # 413 18.89' in),POOH w/ clean out assy. on 2-7/8" PH6 work string. F/ 12,712' T/ 11,740' Using constant hole fill losing 15 BPH. P/U WT 116k , S/O WT 34 k Slight pipe chatter while POOH T/ 12,294' At 11,879 Over pulled 30k. S/O = 36k, Pick back up clean 112k. Cont POOH 11/4/2022 POOH w/ clean out assy. on 2-7/8" PH6 work string. F/ 11,740' T/ 6789' pulling slow to avoid swabbing. Slight chattering until 10,941' pulling smooth from there Using constant hole fill losing 15 BPH. P/U WT 61k ,,POOH w/ clean out assy. on 2-7/8" PH6 work string. F/ 6789' To surface. pulling slow to avoid swabbing. Using constant hole fill losing 15 BPH.,Pull Mill, motor, & jars. Inspect & lay down. Clean & clear floor.,Set TWC via dry rod.,Prep for BOPE test. Fills pit w/ 40 bbls fresh water Fill stack with fresh water \Preform shell test. P/U 2-7/8" test joint. 11/5/2022 Service Rig,Test BOPE as per approve sundry T/ 250 PSI low & 3000 PSI High F/ 5/5 charted mins. AOGCC state witness present, Kam St john. Preform accumulator drawdown. Multiply fail pass on Mud cross.,P/U & M/U AICD liner as per tally. Utilize dog collar on all joints.,Over torqued pup on X nipple following Baker rep torque recommendation. Mobilize new pup to location. 11/5/2022 Set TWC # 712 with dry rod BOP test. well on vac Pull TWC # 712 with dry rod after BOP test, well on vac. Daily Report of Well Operations PBU J-20C 11/6/2022 New Pup to location. B/O damaged pup from X nipple. Install new pup. Install Baker deployment sleeve.,Preform fluid check on rig while Breaking down safety joint. Position TIW on floor.,Begin RIH w/ 2-3/8 AICD liner on the 2-7/8 PH6 work string from 1,552' to 7,912',Service Rig,RIH w/ 2-3/8 AICD liner on the 2-7/8 PH6 work string F/ 7,912' T/ 10,004' P/U wt = 107k S/O wt = 32k,Rig up to reverse circulate Close bag pump down kill line, takings returns f/ tubing Circulate 100 bbls f/ 1.3% safe lube pill AT 1.5 BPM w/ 985 psi Lost,Rig dowe cir. lines & blow down. P/U wt = 93k S/O wt = 36k after spotting pill.,Con't RIH w/ 2-3/8 AICD liner on the 2- 7/8 PH6 work string F/ 10,004' T/ 12,714 ' P/U wt = 128k S/O wt = 37k,Tag CIBP w/ 15K dw. Rig up to pump dw tbg. M/U TIW & head pin. Pump 25 bbls diesel Chase W/ 65 bbls seawater at 2 BPM 2400 psi. P/U off liner, B/O wt = 100k, loss of 28K, Begin POOH with 2-7/8 PH6 work string F/ 11,165' T/ 10,574' P/U WT 99K 11/7/2022 Continue POOH with 2-7/8 work string pumping continuous hole fill losing 10 BPH. work string started pulling wet,Mix 10 BBL dry job and pump down work string. blow lines dry.,Continue POOH with 2-7/8 work string pumping continuous hole fill losing 10 BPH,L/D BH deployment sleeve, inspect. All components intact and whole. Clean & clear floor. Remove misc. well equip. from rig floor,Set BPV via dry rod.,Rig up little Red to freeze protect tubing Bull head 200 bbls dw tubing thru BPV Pump at 1.5 BPM initial psi = 1,200psi Final circ. psi = 2,060 Rig down & blow down lines.,Flush stack w/ seawater & lines. Blow down all equipment. Remove excess seawater from pits & stack . Prep for Rig move. Lay down derrick 11/8/2022 Spot in crane. Hold PJSM Released from J-20C @ 06:00 11-8-22 11/8/2022 T/I/O=BPV/0/0. Post ASR RWO. ND 11" BOP and 11" x 13" DSA, NU CIW 13 5/8" THA and 4" CIW FLS tree with Baker actuator. Torqued flanges to API spec. 550 ft.lbs. Wellhead tech perform PPPOT-T on THA VOid to 5000 psi for 30 min. Passed. RU CIW lubricator and "H" pulling tool. RIH to offset poppet and PT tree flanges. (15 psi present) Pull 4" CTS BPV 4-3 and swap tooloing to setting too. Set 4" TWC #432 at 125". Pressure test tree against TWC to 300/5000 psi for 5 min. Pass. Pulled 4" TWC #432 and RD lubricator. Installed tree cap and PT to 500 psi. ***Job Complete*** Final WHP's 15/0/0. 11/8/2022 Clean void & ring groove, install new BX-160, fill void w/ hydr. fluid, N/U THA/tree, test void 500 psi/5 min., 5,000 psi/30 min, good tests, no loss, bleed off, RDMO Daily Report of Well Operations PBU J-20C 11/9/2022 ***WELL S/I ON ARRIVAL*** (RWO capital) DRIFT W/ 3.80" SWEDGE TO TOP OF DEPLOYMENT SLEEVE AT 11,130' MD (ring on bottom of swedge) ATTEMPT TO SET 4-1/2" TBG STOP ON DEPLOYEMENT SLEEVE AT 11,130' MD ***CONT ON 11/10/22 WSR*** 11/10/2022 ***CONT FROM 11/9/22 WSR*** (RWO capital) SET 4-1/2" TBG STOP ON DEPLOYMENT SLEEVE AT 11,130' MD ***WELL S/I ON DEPARTURE*** 11/30/2022 LRS Well Test Unit 6, Flowback/ Well Test, Begin WSR on 11/30/22. IL Well J-20, OL Well J-09, Unit Move, RU, PT, Cont WSR on 12/01/22 12/1/2022 LRS Well Test Unit 6, Flowback/ Well Test, Cont WSR from 11/30/22. IL Well J-20, OL Well J-09, PT, STBY for WS, RU Tanks/ PBGL, POP, Flow Stbilize. Cont WSR on 12/02/22 12/2/2022 LRS Well Test Unit 6, Flowback/ Well Test, Cont WSR from 12/01/22. IL Well J-20, OL Well J-09, Allow well to stack out, RePOP, Flow, Stbilize. Cont WSR on 12/03/22 12/3/2022 LRS Well Test Unit 6, Flowback/ Well Test, Cont WSR from 12/02/22. IL Well J-20, OL Well J-09, Flow, Stabilize. Cont WSR on 12/04/22 12/4/2022 LRS Well Test Unit 6, Flowback/ Well Test, Cont WSR from 12/03/22. IL Well J-20, OL Well J-09, Flow, Divert into HP header, Divert into WPS, Purge, Begin 12hr PBWT. Cont WSR on 12/05/22 12/5/2022 LRS Well Test Unit 6, Flowback/ Well Test, Cont WSR from 12/04/22. IL Well J-20, OL Well J-09, End 12hr PBWT, Divert out of WPS, Divert out OF HP header, Divert into LP header, Blow down, De-inventory vessel, RDMO. End WSR on 12/05/22 4 AICD Discs per sub 1 Regg, James B (OGC) From:Charles Huntington - (C) <Charles.Huntington@hilcorp.com> Sent:Sunday, October 30, 2022 7:42 PM To:DOA AOGCC Prudhoe Bay; Regg, James B (OGC); Brooks, Phoebe L (OGC) Cc:Charles Huntington - (C); Alaska NS - ASR - Well Site Managers Subject:BOPE Test, PBU J-20, 10-30-2022 Attachments:J-20 BOPE test report 10-30-22.xlsx To All, Please see attached Initial BOPE Test for Well # PBU J‐20 Thank you, Charles Huntington Night DSM ASR # 1 907‐388‐3075 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Some people who received this message don't often get email from charles.huntington@hilcorp.com. Learn why this is important CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU J-20C PTD 2101240 === J-20C jbr STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner:Rig No.:ASR 1 DATE:10/30/22 Rig Rep.:Rig Email: Operator: Operator Rep.:Op. Rep Email: Well Name:PTD #2101240 Sundry #322-471 Operation:Drilling:Workover:x Explor.: Test:Initial:X Weekly:Bi-Weekly:Other: Rams:250/3000 Annular:250/2500 Valves:250/3000 MASP:2430 MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 1 P Permit On Location P Hazard Sec.P Lower Kelly 0 NA Standing Order Posted P Misc.NA Ball Type 1 P Test Fluid Water Inside BOP 1 P FSV Misc 0 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0 NA Trip Tank NA NA Annular Preventer 1 11"P Pit Level Indicators P P #1 Rams 1 2 7/8" x 5"P Flow Indicator P P #2 Rams 1 Blinds P Meth Gas Detector P P #3 Rams 0 NA H2S Gas Detector P P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 2 1/16"P Time/Pressure Test Result HCR Valves 1 2 1/16"P System Pressure (psi)3025 P Kill Line Valves 2 2 1/16"P Pressure After Closure (psi)1850 P Check Valve 0 NA 200 psi Attained (sec)16 P BOP Misc 0 NA Full Pressure Attained (sec)54 P Blind Switch Covers:All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.):4 / 2237 PSI P No. Valves 16 P ACC Misc 0 NA Manual Chokes 1 P Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result CH Misc 0 NA Annular Preventer 25 P #1 Rams 5 P Coiled Tubing Only:#2 Rams 5 P Inside Reel valves 0 NA #3 Rams 0 NA #4 Rams 0 NA Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:0 Test Time:6.0 HCR Choke 1 P Repair or replacement of equipment will be made within days. HCR Kill 0 NA Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 10/28/2022 6:52 Waived By Test Start Date/Time:10/30/2022 11:00 (date)(time)Witness Test Finish Date/Time:10/30/2022 17:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Austin McLeod Hilcorp Test preformed w/ 2-7/8" test joint. Bottle precharge pressure 1000 psi. C.Pace / C. Greub Hilcorp Alaska LLC A.Haberthur/ C. Huntington PBU J-20C Test Pressure (psi): askans-asr-toolpushers@hilcorp.co ans-asrwellsitemanagers@hilcorp Form 10-424 (Revised 08/2022)2022-1030_BOP_Hilcorp_ASR1_PBU_J-20C =========Hilcorp North Slope LLC J. Regg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y Anne Prysunka at 9:43 am, Aug 08, 2022 'LJLWDOO\VLJQHGE\6WDQ*ROLV '1FQ 6WDQ*ROLV RX 8VHUV 'DWH 6WDQ*ROLV '656)' %23(WHVWWRSVL$QQXODUWRSVL 0*5$8* 6)' GWV -/& Jeremy Price Digitally signed by Jeremy Price Date: 2022.08.11 14:31:06 -08'00' RBDMS JSB 081522 0DNHXS3&(PJU dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ&XUUHQW6FKHPDWLF dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ WƌŽƉŽƐĞĚ ^ĐŚĞŵĂƚŝĐ dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ KW^ĐŚĞŵĂƚŝĐ dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ dŝĞͲ/Ŷ>ŽŐ dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ dh džƚĞŶĚĞĚĚĚWĞƌĨ ĂŶĚZtK >ŝŶĞƌ/ŶƐƚĂůů :ͲϮϬ Wd͗ ϮϭϬͲϭϮϰ Changes to Approved Sundry Procedure 'DWH 6XEMHFW 6XQGU\ $Q\PRGLILFDWLRQVWRDQDSSURYHGVXQGU\ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ&KDQJHVWRDQDSSURYHG VXQGU\ZLOOEHFRPPXQLFDWHGWRWKH$2*&&E\WKH³ILUVWFDOO´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y Samantha Carlisle at 9:51 am, Mar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perator Name:2. Development Exploratory Service 5 Permit to Drill Number:210-124 6.50-029-21716-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14295 10712 8688 10251 None 10712, 13245 8269 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 26 - 106 26 - 106 1530 520 Surface 2907 13-3/8" 28 - 2935 28 - 2715 5380 2670 Intermediate 3126 9-5/8" 26 - 3152 26 - 2869 6870 4760 Production 7496 7" 3040 - 10536 2790 - 8530 7240 5410 Perforation Depth: Measured depth: 10550 - 13760 feet True vertical depth:8543 - 9027 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 24 - 10373 24 - 8382 10251 8269Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Packer Liner 3924 4-1/2" 10367 - 14291 8376 - 9021 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1031350178585 510776 150 50539 384 925 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brian Glasheen Brian.Glasheen@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5277 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9020 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028281, 0028284 PBU J-20C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 8:31 am, Jun 21, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.06.21 07:52:29 -08'00' Stan Golis (880) DSR-6/21/21 SFD 6/21/2021MGR27JUL2021RBDMS HEW 6/21/2021 ACTIVITY DATE SUMMARY 6/5/2021 ***WELL FLOWING ON ARRIVAL***(profile mod). DRIFTED W/ 3.70" WRP DRIFT TO 10,750' SLM. TAGGED XN W/ 3.77" GAUGE RING @ 10,344' SLM (+17' correction). SET 4-1/2" EVO BRIDGE PLUG @ 10,695' SLM/ 10,712' MD. ***WELL LEFT S/I ON DEPARTURE, JOB COMPLETE*** Daily Report of Well Operations PBU J-20C Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:210-124 6.50-029-21716-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14295 13245 9029 10251 None 13245 8269 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 30 - 110 30 - 110 1530 520 Surface 2907 13-3/8" 28 - 2935 28 - 2715 5380 2670 Intermediate 3126 9-5/8" 26 - 3152 26 - 2869 6870 4760 Liner 7496 7" 3040 - 10536 2790 - 8530 7240 5410 Perforation Depth: Measured depth: 10550 - 13760 feet True vertical depth:8543 - 9027 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 24 - 10373 24 - 8382 10251 8269Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Packer Liner 3924 4-1/2" 10367 - 14291 8376 - 9021 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 1014450158540 17850539 350 45003 585 1031 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Brian Glasheen Brian.Glasheen@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.564.5277 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9020 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028281, 0028284 PBU J-20C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:05 am, Jun 04, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.06.04 07:19:06 -08'00' Stan Golis (880) SFD SFD 6/17/2021DSR-6/7/21 2978 RBDMS HEW 6/4/2021 MGR27JUL2021 ACTIVITY DATE SUMMARY 4/16/2021 ***WELL FLOWING ON ARRIVAL*** (perf) RAN 30' x 2-7/8" DMY-GUNS TO DEVIATE OUT @ 11,241' SLM. ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE*** 5/17/2021 ***WELL S/I ON ARRIVAL*** PERFORATE 10550'-10575' WITH 25' x 2.75" MILLENNIUM CHARGES, 6 SPF, 60 DEG PHASING. ***JOB COMPLETE, WELL S/I ON DEPARTURE, DSO NOTIFIED*** 5/17/2021 T/I/O = 2470/150/100. Temp = SI. TBG FL (E-Line). No AL. TBG FL @ 11250' (171 bbls). Haliburton E-Line in control of well upon departure. 08:20 5/17/2021 T/I/O = 2480/150/100. Temp = SI. IA FL (eline request). IA FL @ near surface (~50', 2.7 bbls). SV, WV = C. SSV, MV = O. IA, OA = OTG. 04:15 5/17/2021 T/I/0 2460/125/91 Assist E line load TBG Pumped 57 bbls crude down TBG. IA and OA = OTG. E line in control of well upon LRS departure. FWHP's = 1572/121/85 Daily Report of Well Operations PBU J-20C Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Lc) - Ica 14— Well History File Identifier Organizing (done) ❑ Two-sided 111 1I111111II11I III ❑ Rescan Needed I 1111111 I III III RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: v(Greyscale Items: ❑ Other, No/Type: ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: AIND Date: 4101111,... /sl ildP Project Proofing 11111111111111 II III BY: Maria Date: a pD J lsl Me Scanning Preparation 4 x 30 = /c 0 + I O = TOTAL PAGES 30 (Count does not include cover sheet) 04 BY: - Date: I D /� lsl Production Scanning 111 1111111111111111 Stage 1 Page Count from Scanned File: j 3 1 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: LZYES NO BY: AC.. Date: 401/i f /s/ 114 F Stage 1 If NO in stage 1, page(s)discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I 1 111 1111111111 ReScanned 111111111111 II 111 BY: Maria Date: /s/ Comments about this file: Quality Checked I 111111 12/22/2011 Well History File Cover Paae.doc I - I o az cc - 1 i f° au_ au_0 w w 1 illb N z 1 °_ �W 0..- a s. Ile I rn U 4 XO_ XO_ y 0 0 N i 5 clan = awl rn a 9 D dla v a a v a—° D v) y El.=az ._CZC a_i 0� lI 0 E a)0m o0ap� 0< Et Z Z ' U u 0 II c>a02 O1- oF- !, �0 0 Jaa JaaF- 2U 1-0 Q C a1 O O > J N 0 y N N N N Z O 1 O J a CO CO CO M M M CO _ E c I S2 - C C C N 7 E Cl) �a C 0 = a) a. a E Q (n a) 0 0 0 0 o • �/ J U Q I''1 o Cl 0 O ! L O Z j N y N N N NO a1 O U C 1 y• r • 0 aya z z 1 IX 0 l N M M M• N 0 W K W J N U aap O a Z c o L 3 0 I-0 Q p co Z,' .O Jd 2 N 0. -(71 H R = 115 H 0 co I > E Om N c Z U U .�o u_c r O y a N a E d i O. R O U N N J fA J Q N Z W II-- Z O W N 2 N• M i z U y M Q m I d C Cl) w a) a v� p p 2 a7 D c vi I w Q c a l z° , w 4' 4 0 Z o I a- ° > > > d U O C N N m I E J N N N I (0 z 7II a s l i 1,II I N! O O O O C E > U U U C f NO I'I I IQ 0 7 7 d7 Z C C C w y J z rn L E 0 > ZO y a m 2 H Z O 2 r C W O Z a0 _N Q p E E E m z v C] a r 01� J N Z Q C'• Q) y O N U C ▪ •0 y 'O �. - w 1 ! !'.L d O o Qp U N) � ' u 1- a 0)« a a a a CL H i ] F- J o H __W_-__ J J a > 0 <a 10 I 0 0 O CJ m n Z N N �( O N O Z F.Q ---)I U 0 ( N z 1 S N 7 Y co 1-6 rN J 0 I.I Q N 0 Z EL s Ce 0 J a W x W J V m 0 Z Q ~ l`0 y y z J 0. O. O co N c C o G O a) O N Tx M E UN 0 0 n- Q a 0 (14 Lr ~ O C Z G Q c-2 m m p O a) C • a Q a o a) Q c a Z E o 0 E e A m z 0 • o N O O N f- m -0 r 0 3 N N N a' •= a E m• a 0 a 2 v STATE OF ALASKA ' AL _r(A OIL AND GAS CONSERVATION COMMI__,ON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon L] Repair Well 11 Plug Perforations H Perforate U Other 11 )f f ' f Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat.Shutdown"! Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc • Development o . Exploratory ❑ 210-124-0 • 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-21716-03-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028284 PBU J-20C • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL• 11.Present Well Condition Summary: Total Depth measured 14295 feet• Plugs measured None feet true vertical 9020.48 feet Junk measured None feet Effective Depth measured 13474 feet Packer measured See Attachment feet true vertical 9026.07 feet true vertical See Attachment feet • Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.1#H-40 27-107 27-107 1530 520 Surface 2942 13-3/8"72#L-80 26-2968 26-2738.57 4930 2670 Intermediate None None None None None None Production 3127 9-5/8"47#L-80 25-3152 25-2868.52 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 12750-12950 feet 13000-13220 feet 13270-13450 feet 13500-13760 feet True Vertical depth 9027.04-9026.94 feet 9026.66-9028.41 feet 9028.38-9026.48 feet 9025.83-9027.26 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 24-10373 24-8381.57 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: it 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 1236 55244 456 0 1114 Subsequent to operation: 1120 44956 289 0 1101 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development El ' Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil U• Gas LJ WDSPLLJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCI 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhayst BP.com Printed Name Nita Summerhay-/ Title Petrotechnical Data Technician / � Signs_=s a nt 1 Phone 564-4035 Date 7/2/2013 11 V'-r- 9/m/�41BD(VIS JUL - 3 201 Form 10-404 Revised 10/2012 "1-P/2 Submit Original Only Daily Report of Well Operations ADL0028284 M Continued from WSR of 06/06/13 CTU 3, 1.75" coil. Job Scope: PPROF. set CIBP for GSO. Down load memory PPROF data. Majority of flow from bottom set of perforations. Talk to town PE and determine to set CIBP at 13475'. M/U HES EZSV for 4.5" tubing. PT lube with low and high press. Shut in well. Bullhead 100 bbl KCL with Safelube. RIH with HES 4.5" EZSV BHA. Tie in at flag and set plug with center element 13475', top of plug 13474'. Set 5k down to confirm plug set, POOH. RDMO CTU to Y-33. 6/7/2013 ***Job Complete*** FLUIDS PUMPED _ BBLS _ 41 50/50 METH _ 100 1% KCL W/SAFELUBE 141 TOTAL m ,00000co o N � oco co o - c\Ir- C.) c) c) O- M M m r N- co CD 'V CO CO N I� N CO 0 o O O CO 00 V- C) N CO CO CO IC) O CO r Cr) CO a) N N 00 II a CO CO N 0 cri Lo N N N N N N- Cr) N Ca CD 0 N o Cr) O_ O V' M N Cr) r � • 00 2 Q N O O) ( I Na8NNN C 7 � J o co oo °° o J co _J C) 00 J r •jU) E N *k N CO V O N T- N " � N 0) M O a0) N N N `V co C C() V a) — O) J ti M M N • z • O W H0 DUCE 1OQCLOLLZ UZZQ » O C/) Packers and SSV's Attachment ADL0028284 SW Name Type MD _ TVD Depscription J-20C PACKER 3040 2721.61 7" Baker ZXP Top Packer J-20C PACKER 10251 8200.69 4-1/2" HES TNT Perm Packer J-20C PACKER 10367 8307.39 5" HRD-E ZXPN Packer WELLI-EAD= MCEVO J -2 0 Cj 4-1/2"CHROME M E TBG"AINI�TIAL,SIDETRACK A-& ACTUATOR= BAKER C "B" NOT SHOWN BELOW WHIPSTOCK @ 3152' NTlAL KB.ELE 78.4' ( I . BF.ELEV= 39.5 KOP= 3152 Max Angle= 97°@ 11544' ' ' I 2189' —$4-1/2"HES X NP,D=3.813" Datum A43= 10941' Datum TVD= 8800'SS 13-3/8"CSG,72#,L-80,13=12.347" H 2978' 3040' -19-5/8"X 7"BKR ZXPPKRw/it FBR TOP OF T LNR —{ 3040' &FLEX LOCK LNR HGR,D=6.18" 7' M-PSTOCK(11/06/10) H 3152' 9-5/8"CSG,47#,L-80 NSCC,D=8.681" —I — 3152' _\ 9-5/8"FALLOUT WN)0W(J-20C)3157-3169' GAS LIT MANDRELS ID = 3.725" 10360' -a ST PD TVD GAS TYPE VLV LATCH PORT DATE I4-1/2" HES XN NIPPLE 3 4580 3911 42 KF( ME 2 DO BEK 16 01/05/11 I r 2 7594 6121 42 KBG2 SO SBK 20 01/05/11 1 10104 8134 23 KBG2 DM' SBK 0 12/02/10 ' ,---� 10221' H4-1/2"HES X143,D=3.813" 10251' --IT X 4-1/7'HES TNT FKR,ID=3.856" I ' ' 10286' _I-14-1/2-HES X NP,D=3.813" ill I 10361' 4-1/2"I-ES XN NP,D=3.725' TOP 0E4-1/2"LW H 10367' I 10367' 17"X 5"BKR HRD-E ZXPN A(R 4-1/2"TBG,12.6#,13CR-85 VAM TOP, H 10372' w/11' D=4.20" 0152 bpf,D=3.958" 1 10373' H41/2'w0=4.100' I 7"LW,26#,L-80 VAM TOP HC XO TO L-80 BTC-M, H 10417 1—X --{�M)TT NOT Loci 1--Al 10383' H T X 5"BKR FLEX LOCK 0=4.290' J 7'LNF{26#, L-80 BTC-M,.0383 bpf,D=6.276" l 10536' 10393' I-15"X 4-1/7'XO,13=3.958' PERFORATION SUMMARY REF LOG:SFERRY MWD ON 11/27/10 _ ANGLE AT TOP F :90°@ 12750' Note:Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sgz SHOT SQZ 2-7/8' 6 12750-12950 0 11/30/10 2-7/8' 6 13000-13220 0 11/30/10 2-7/8' 6 13270-13450 0 11/30/10 2-7/8' 6 13500-13760 C 11/30/10 I 13474' 1-44-1/2"HES EZSV CEP(06/07/13) I — PBTD —I 14202' ii41/2 L NR 12.6#,L-80 BT- M .0152 bpf,D=3.958" —1 14291' •�• • • DATE REV BY COMMENTS DATE REV BY COM ENTS F-RUDHOE BAY UNIT 05/09/87 AUDI 2 ORIGINAL COMPLETION 01/13/11 AK/PJC ANAL DRLG CORRECTIONS WELL J-20C 06/58/90 D16 RWO 11/09/12 MB/PJC PERF REF LOG CORRECTION PERMr Pb: 2021240 08/11/96 NZES SIDETRACK(J-20A) 06/13/13 CF/JMD SET CBP(06/07/13) AR No: 50-029-21716-03 10/19/02 N2ES CTD SIDETRACK(J-20B) SEC 9,T11 N,R13E,1215 FNL&802'Fa 12/03/10 0-141 SIDETRACK(J-20C) 01/12/11 WR2/PJC GLV C/O(01/05/11) BP BEploration(Alaska) WELL LOG TRANSMITTAL To: State of Alaska February 23, 2011 Alaska Oil and Gas Conservation Commission Attn.: Christine Shartzer 333 West 7th Avenue,Suite 100 Anchorage,Alaska 99501-3539 RE: LWD Formation Evaluation Logs: J-20C AK-MW-0007738989 J-20C 50-029-21716-03 2"x 5" MD Triple Combo Logs: 1 Color Log 2"x 5"TVD Triple Combo Logs: 1 Color Log Digital Log Images&LWDG-formatted LIS Data w/verification listing; 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Attn: Bryan Burinda 6900 Arctic Blvd. Anchorage,Alaska 99518 c- -04 Office: 907-273-3536 Fax: 907-273-3535 B ' '' p! ( ; n.com Date: Signed: �� Saltmarsh, Arthur C (DOA) From: Barker, Elizabeth R(SAIC) [Elizabeth.Barker @bp.com] Sent: Tuesday, February 01, 2011 4:17 PM To: Saltmarsh, Arthur C (DOA) Cc: Stewman, Sondra D; Hubble, Terrie L; Barker, Elizabeth R(SAIC) Subject: Well is on Production: PBU J-20C/PTD#210-124 Hello Art, Well Name: PBU J-20C Permit#: 210-124 API #: 50-029-21716-03-00 This well began Production on January 29, 2011 Method of Operations is: Flowing Date of Test: January 31, 2011 Hours Tested: 8 24-Hour Rate/Oil - Bbl: 4878 24-Hour Rate/Gas - Mcf: 3967 24-Hour Rate/Water- Bbl: 22 Test Rate/Oil - Bbl: 1626 Test Rate/Gas - Mcf: 1322 Test Rate/Water- Bbl: 7 Choke Size: 128 Gas-Oil Ratio: 813 Flow Tubing Pressure: 700 Casing Pressure: 1800 Oil Gravity-API: Unavailable Thank you, Liz Barker SAIC,Projects Analyst BP,ADW Support 564-5674 1 ' '7/ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 12/3/2010 210-124 3. Address: 6.Date Spudded: 13. API Number. P.O. Box 196612,Anchorage,Alaska 99519-6612 11/08/2010 50-029-21716-03-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 11/27/2010 PBU J-20C 1215'FNL,802'FEL,SEC 09,T11N, R13E, UM 8. KB(ft above MSL): 68.67' 15.Field/Pool(s): Top of Productive Horizon: 1030'FNL,4223'FEL,SEC 15,T11N, R13E, UM GL(ft above MSL): 39.5 Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 1762'FNL,2003'FEL, SEC 16,T11N, R13E, UM 14202' 9024' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 643560 y- 5970139 Zone- ASP4 14295' 9020' ADL 028281,028284 TPI: x- 645527 y- 5965081 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 642483 y- 5964291 Zone- ASP4 N/A 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: Dir,GR, RES, MWD, PDC, NEU, DEN 3152' 2869' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE To BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu vds Concrete 13-3/8" 72# L-80/S-95 Surface 2978' Surface 2746' 17-1/2" 4127 cu ft Permafrost 9-5/8" 47# L-80 Surface 3152' Surface 2869' 12-1/4" 2141 cu ft Class'G'.230 cu ft Class'G' 7" 26# L-80 3039' 10534' 2790' 8528' 8-1/2" 281 cu ft Class'G' - 4-1/2" 12.6# L-80 10367' 14291' 8376' 9021' 6-1/8" 550 cu ft Class'G' 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open (MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD) 2-7/8"Gun Diameter,6 SPF 4-1/2", 12.6#, 13Cr-85 10373' 10251'/8269' MD ND MD TVD 12750'-12950' 9027'-9027' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 13000'-13220' 9027'-9028' 13270'-13450' 9028'-9026' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 13500'-13760' 9026'-9027' Freeze Protected with 138 Bbis of Diesel e. 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes EI No Sidewall Core(s)Acquired? ❑Yes IN No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboyektipipinalOpai keputbsO AAC 250.071. None JAN 2 0 2011 RBDMS JAN 2 01011 Alaska t;i~g Gan Cogs_Coriiv ibsipp Form 10-407 Revised 12/2009 ONTINUED ON REVERSE Submit nginai Only l���t 'ir j G i zE//, 29. GEOLOGIC MARKERS(List all formations markers encountered): 30. FORMATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. THRZ 8719' 6982' BHRZ 9043' 7247' None TJB 10361' 8371' TJA 10440' 8443' Top Sag River 10546' 8539' Top Shublik 10583' 8573' Top Sadlerochit 10674' 8654' TCGL 10880' 8824' BCGL 10980' 8896' 23SB/Zone 2B(Upper Unit) 11103' 8968' 22TS/Zone 2B(Lower Unit) 11130' 8980' HOT 11348' 9036' Formation at Total Depth(Name): 22TS/Zone 2B Lower Unit) 11130' 8980' 31.List of Attachments: Summary of Daily Drilling Reports,Well work summary,Well Schematic Diagram,Surveys and a Leak-Off Test Summary. 32.I hereby certify that the for='ng is true and correct to the best of my knowledge. t Signed: Sondr- ,' ` , Title: Drilling Technologist Date: L) 1 — 1 ' t PBU J-20C 210-124 Prepared By Name/Number. Sondra Stewman,564-4750 Well Number Permit No./Approval No. Drilling Engineer: John Rose,564-5271 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only ,WELLHEAD= MCEVOY ,J .2 0 c 4-1/2" HRO E BG WELL ORIG WELL ORE,11189'*** ACTUATOR= BAKER C SIDETRACK"A"&"B"NOT SHOWN BELOW KB. ELEV = 78.4' I I WHIPSTOCK @ 3152'*** BF.ELEV= 39.5 KOP= 3152 Max Angle= 97°@ 11544' ' I 2189' I-14-1/2"HES X NIP, ID=3.813" Datum MD= 10941' Datum TV D= 8800'SS 13-3/8"CSG, 72#, L-80, ID=12.347" --I 2978' I 3040' 11 9-5/8"X 7"BKR ZXP PKR w/11'PBR TOP OF 7"LNR -1 3040' I &FLEXLOCKLNRHGR, ID=6.18" 7"WHIPSTOCK(11/06/10) — 3152' 4 9-5/8"CSG,47#, L-80 NSCC, ID=8.681" — — 3152' I_ 9-5/8"MILLOUT WINDOW(J-20C)3152'-3169' '7' GAS LIFT MANDRELS Minimum ID = 3.725" @ 10360' ST MD TV DEV TYPE VLV LATCH PORT DATE IA 3 4580 3911 43 KBG2 DOME BEK 16 01/05/11 4-1/2" HES XN NIPPLE 2 7594 6121 42 KBG2 SO SBK 20 01/05/11 1 10104 9134 23 KBG2 DMY SBK 0 12/02/10 ■ I I 10221' I-14-1/2"HES X NIP, ID=3.813" I $ Z ( 10251' H7"X 4-1/2"HES TNT PKR, ID=3.856" I ' ' 10286' 1-14-1/2"HES X NIP, ID=3.813" I I I 10361' H4-1/2"HES XN NIP, ID=3.725" I TOP OF 4-1/2"LNR -I 10367' I- I 10367' I-7"X 5"BKR HRD-EZXPN PKR 4-1/2"TBG, 12.6#,13C R-85 VAMTOP, H 10372' w/11'PBR, ID=4.20" .0152 bpf, ID=3.958" 10373' J-J4-1/2"WEG, ID=4.100" I 7"LNR,26#, L-80 VAM TOP HC XO TO L-80 BTC-M, --I 10412' I-X H ELMD TT NOT LOGGED I 10383' 1-17"X 5"BKR FLEX LOCK HGR, ID=4.290" 1 7"LNR,26#, L-80 BTC-M, .0383 bpf, ID=6.276" -1 10536' 10393' I-15"X 4-1/2"XO, ID=3.958" I PERFORATION SUMMARY REF LOG: MEMORY CCL/GR/CNL ON 10/17/02 ANGLE AT TOP PERF:90°@ 12750' I Note: Refer to Production DB for historical perf data I SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8' 6 12750- 12950 0 11/30/10 2-7/8' 6 13000- 13220 0 11/30/10 2-7/8' 6 13270- 13450 0 11/30/10 2-7/8' 6 13500- 13760 0 11/30/10 PBTD H 14202' ... 4-1/2"LNR, 12.6#,L-80 IBT-M, .0152 bpf, ID=3.958" -1 14291' �•�•• DATE REV BY COMMENTS DATE REV BY COMMENTS I PRUDHOE BAY UNIT Tit.) 05/09/87 AUDI 2 ORIGINAL COMPLETION 01/12/11 WRR/PJC GLV C/O(01/05/11) WELL: J-20C - 10 '- l Z4 06/58/90 D16 RWO 01/13/11 AK/PJC .FINAL DRLG CORRECTIONS PERMIT No:F2021240 08/11/96 N2ES SIDETRACK(J-20A) AR No: 50-029-21716-03 10/19/02 N2ES CTD SIDETRACK(J-20B) SEC 9,T11 N,R13E, 1215'FNL&802'FEL 12/03/10 D-141 SIDETRACK(J-20C) 12/10/10 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) North America -ALASKA- BP Page 1 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/1/2010 00:00 - 03:00 3.00 MOB P PRE PREPARE RIG FOR MOVE. -BLOW DOWN HOSES -DISCONNECT SERVICE AND ELECTRICAL LINES 03:00 - 04:30 1.50 MOB P PRE MOVE PIPE SHED AND ROCK WASHER, STAGE BOTH COMPLEXES ON PAD. 04:30 - 05:00 0.50 MOB P PRE HOOK UP SOWS TO COMPLEXES FOR MOVE TO J-PAD. 05:00 - 07:30 2.50 MOB P PRE MOVE COMPLEXES TO J-PAD. RETURN SOWS TO B-PAD. 07:30 - 09:00 1.50 MOB P PRE HOLD PJSM,WITH DRIVERS AND RIG CREW. HOOK UP WEIGHTED SOWS TO SUB BASE. PULL SUB BASE OFF OF B-08A. HOOK UP SOWS TO PIPE SHEDS,STAGE SHEDS AT ENTRANCE OF PAD. 09:00 - 12:00 3.00 MOB P PRE MOVE SUB BASE AND PIPE SHEDS TO J-PAD. ALL MODULES ON J-PAD LOCATION AT 12:00. 12:00 - 18:00 6.00 MOB P PRE SPOT AND SHIM SUB BASE. LAY MATTS FOR COMPLEXES,SET AND SHIM SAME. SET ROCK WASHER AND PIPE SHEDS. 18:00 - 20:00 2.00 MOB P PRE HOOK UP SERVICE LINES -ELECTRICAL -WATER -STEAM -GYLCOL RIG READY TO TAKE ON SEAWATER IN PITS. 20:00 - 00:00 4.00 MOB N WAIT PRE TAKE ON SEAWATER IN PITS.PERFORM HOUSE KEEPING AND GENERAL MAINTENANCE ON RIG. SLIP AND CUT DRILLING LINE. 11/2/2010 00:00 - 12:00 12.00 MOB N WAIT PRE CALIBRATE PVT SYSTEM IN PITS. BEGINNING WITH PIT EMPTY, FILL PIT IN 15 BBL INCREMENTS AND COMPARE PIT STRAP TO PVT SYSTEM.CONTINUE UNTIL PIT FULL. REPEAT FOR ALL PITS. -CALIBRATION WITNESSED BY QUADCO TECHNICIAN WHILE WORKING ON CALIBRATION OF PVT ALSO CHANGED OUT THE SAVER SUB, SERVICED THE TOP DRIVE,CHANGED OUT 1502 FITTINGS AND HALLIBURTON VALVES ON THE RIG FLOOR. LOADED THE PIPESHED WTIH 4"DRILLPIPE, INSPECT THE DERRICK, REPLACED THE 3"DISCHARGE LINE IN THE PITS,AND SERVICE THE MUD PUMPS. SPILL DRILL WITH TED KRUGER'S CREW, CRT 2 MIN 0 SEC. Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 2 of 22? Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-0OXCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 MOB N WAIT PRE CHANGE OUT THE BLADDERS IN 4 ACCUMULATOR BOTTLES. REPLACE LOW PRESSURE MUD LINES IN THE PITS AND CENTRIFICAL ROOM,MOBILIZE ALL BOP TESTING EQUIPMENT TO THE RIG FLOOR, LAYDOWN ALL LIFT SUBS THAT ARE NOT NEEDED FOR UPCOMING OPERATIONS. PERFORM MAINTENANCE ON THE GAS DETECTORS. SPILL DRILL WITH ART MORGAN'S CREW, CRT 1 MIN 45 SEC. 11/3/2010 00:00 - 11:00 11.00 MOB N WAIT PRE WORK`ON GENERAL RIG MAINTENANCE. FLOOD AND CHECK NEW LOW PRESSURE MUD LINES. GOOD TEST. CLEAN OUT SUCTION DAMPENER ON MUD PUMPS 1 AND 2. ORGANIZE ALL OF THE TOOLS IN THE CELLAR AND CLEAN THE MEZZANINE. WELD A KEY STOP ONTO THE PIPE SKATE ELEVATOR AND TIGHTEN UP THE DRAG CHAIN. FIRE DRILL WITH TED KRUGER'S CREW,CRT 2 MIN 0 SEC. 11:00 - 14:00 3.00 WHSUR P WHDTRE RECEIVE AUTHORIZATION TO PROCEED WITH THE DECOMPLETE OF J-20C. INSTALL THE SECOND ANNULUS VALVES ONTO THE IA AND OA. RIG UP LINES AND HOSES. FIRE DRILL WITH ART MORGAN'S CREW,CRT 2 MIN 45 SEC. 14:00 - 17:00 3.00 WHSUR '' P WHDTRE RIG UP LITTLE RED SERVICES AND TEST THE OA TO 250 PSI LOW FOR 5 MINUTES, 2000 PSI HIGH FOR 10 MINUTES.CHARTED. TEST THE TUBING X IA TO 250 PSI LOW FOR 5 MINUTES AND 2500 HIGH FOR 10 MINUTES CHARTED. GOOD TEST. BLEED OFF PRESSURE AND RIG DOWN LRS. 17:00 - 18:45 1.75 WHSUR P WHDTRE RIG UP DSM LUBRICATOR AND TEST TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. GOOD TEST. PULL THE BPV AND RIG DOWN THE LUBRICATOR. 18:45 - 21:30 2.75 WHSUR P WHDTRE RIG UP TO REVERSE CIRCULATE OUT FREEZE PROTECT. TEST THE LINES TO 250 PSI LOW/2500 PSI HIGH FOR 5 MINUTES. 21:30 - 22:45 1.25 WHSUR P WHDTRE REVERSE CIRCULATE 250 BBLS OF 8.5 PPG SEAWATER INTO THE WELLBORE. RECOVERED APPROX.225 BBLS OF DIESEL MIXED WITH SEAWATER BACK BEFORE GETTING 25 BBLS OF CLEAN SEAWATER. PUMPED AT 8 BPM WITH 200-300 PSI AND 10 BPM WITH 350-650 PSI. MONITOR WELL. STATIC. 22:45 - 00:00 1.25 WHSUR P WHDTRE RIG DOWN CIRCULATING LINES, REMOVE THE TREE CAP,INSTALL THE TWC AND TEST FROM BELOW TO 500 PSI LOW AND 2000 PSI FOR 5 MINUTES. BOTH GOOD TEST. PRESSURE TEST FROM ABOVE TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES. BOTH GOOD TEST. 11/4/2010 00:00 - 04:00 4.00 WHSUR P WHDTRE NIPPLE DOWN THE TREE AND REMOVE FROM THE CELLAR. TEST FIT THE TC-II CROSSOVER IN THE TUBING HANGER 8.25 TURNS AND LAY IT DOWN FOR FUTURE USE. Printed 1/17/2011 11:01:40AM North America -ALASKA BP Page 3 of 22 Operation Summary Report Common Well Name:J-20 AFE No j Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 BOPSUR P WHDTRE NIPPLE UP THE BOP STACK.. 05:00 - 05:30 0.50 BOPSUR P WHDTRE CLEAN UP TOOLS IN THE CELLAR. 05:30 - 06:00 0.50 BOPSUR P WHDTRE RIG UP TO TEST THE BOP EQUIPMENT. 06:00 - 10:30 4.50 BOPSUR P WHDTRE TEST BOPE WITH 4"AND 4.5"TEST JOINTS TO A LOW 250 PSI/HIGH 3500 PSI,EXCEPT FOR ANNULAR BAG.TEST ANNULAR BAG TO 2500 PSI. 130P -EACH TEST CHARTED AND HELD FOR 5 r MINUTES. G ' TEST WITNESSED BY WSL DAVID JOHNSTON,WSL RICHARD BORDES,AND 1TOOLPUSHER PAT KRUPA. AOGCC REP JOHN CRISP WAIVED WITNESS OF BOPE TESTING 10:30 - 11:30 1.00 BOPSUR P WHDTRE RIG DOWN TEST EQUIPMENT AND BLOW DOWN THE CHOKE MANIFOLD. 11:30 - 12:00 0.50 PULL P DECOMP MOBILIZE CASING EQUIPMENT TO THE RIG FLOOR. 12:00 - 15:00 3.00 PULL N WAIT DECOMP "WAIT ON DRILL SITE MAINTENANCE. LAYDOWN EXCESS TOOLS,BLOW DOWN HARDLINE TO THE OPEN TOP TANK. RIG UP THE DUTCH RISER. -ART MORGAN'S CREW HELD TABLE TOP WELL CONTROL DRILL. 15:00 - 17:00 2.00 PULL P DECOMP RIG UP DRILL SITE MAINTENANCE LUBRICATOR AND TEST TO 350 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES. GOOD TEST. PULL TWC AND RIG DOWN LUBRICATOR. 17:00 - 18:00 1.00 PULL P DECOMP PICK UP 1 JOINT OF DRILLPIPE,MAKE UP CROSSOVER FOR TUBING HANGER AND MAKE UP TIW VALVE. 18:00 - 18:15 0.25 PULL P ®_ DECOMP PULL HANGER FREE AT 68K AND PULL TO THE RIG FLOOR. 18:15 - 19:00 0.75 PULL P DECOMP CIRCULATE 40 BBL SAFE-SURF-0 PILL SURFACE TO SURFACE AT 495 GPM WITH 300 PSI. STROKE COUNTER FAILED TOWARDS THE END OF THE CIRCULATION. WENT OFF OF STROKE COUNTER ON SUPER CHOKE PANEL AND MANUAL STRAP TO VERIFY PROPER DISPLACEMENT DURING CIRCULATION. 19:00 - 20:15 1.25 PULL P ■- DECOMP MONITOR THE WELL. N THE HANGER AND PUP JTS.. BLOW BLOW DOWN THE TOP DRIVE. 20:15 - 00:00 3.75 PULL P -_ DECOMP PULL AND LAYDOWN 91 JTS.OF 4.5"TUBING. AND 2.89'CUT JT. 11/5/2010 00:00 - 01:00 1.00 PULL P DECOMP RIG DOWN CASING EQUIPMENT. 01:00 - 02:00 1.00 CLEAN P -_ DECOMP MONITOR THE WELL AND INSTALL THE WEAR BUSHING. Printed 1/17/2011 11:01.40AM North America -ALASKA- BP Page 4 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 05:00 3.00 CLEAN P DECOMP MAKE UP AND SINGLE IN 9-5/8"SCRAPER BHA. BHA AS FOLLOWS: -8.5"TRI-CONE BIT -BIT SUB -NON-MAG FLOAT SUB -8.5"UPPER STRING MILL -(9)SPIRAL DRILL COLLARS -(15)5"X 3"HWDP -CROSS OVER SUB 05:00 - 08:00 3.00 CLEAN P DECOMP SINGLE IN THE HOLE WITH 4"DRILL PIPE AND TAG THE 7"LINER TOP AT 3203'. UP WT. 95K/DOWN WT.90K. -HELD KICK WHILE TRIPPING DRILL WITH GRANT NEUHARTH'S CREW,CRT 1 MIN 37 SEC. 08:00 - 09:00 1.00 CLEAN P DECOMP LAY DOWN A SINGLE AND RACK BACK 1 STAND OF 4 DRILL PIPE. CIRCULATE A HI-VIS SWEEP SURFACE TO SURFACE AT 610 GPM WITH 1700 PSI. 09:00 - 10:00 1.00 CLEAN P DECOMP PULL OUT OF THE HOLE RACKING BACK 4" DRILL PIPE TO 750'. CHANGE OUT HANDLING EQUIPMENT. 10:00 - 11:00 1.00 CLEAN P DECOMP PULL OUT OF THE HOLE RACKING BACK THE HWDP AND DRILL COLLARS AND LAY DOWN THE BHA. 11:00 - 12:00 1.00 EVAL P DECOMP PICK UP E-LINE TOOLS AND RIG UP E-LIN,E UNIT. 12:00 - 16:30 4.50 EVAL-- P DECOMP PICK UP 9-5/8"EZSV AND RUN IN THE HOLE ON E-LINE. TAGGED THE SCAB LINER TOP AT 3183'E-LINE DEPTH. CORRECTED DEPTH TO 3191'AND PICKED UP TO 3161'AND SET EZSV 5'ABOVE THE COI I AR I CICATFn AT 3166'. GAMMA RAY LOG TO SURFACE. RIG DOWN E-LINE UNIT. 16:30 - 17:30 1.00 EVAL P DECOMP CLOSE THE BLINDS AND TEST THE EZSV AND 9-5/8"CASING TO 350 PSI LOW AND 3500 PSI HIGH FOR 30 MINUTES. GOOD TEST. 17:30 - 00:00 6.50 CLEAN P DECOMP SINGLE IN THE HOLE WITH 4"DRILL PIPE OUT OF THE SHED TO 3100'AND PULL OUT OF THE HOLE RACKING BACK THE DRILL PIPE IN ORDER TO HAVE ENOUGH DRILLPIPE IN THE DERRICK TO DRILL OUT ENTIRE 8.5" INTERMEDIATE SECTION. 11/6/2010 00:00 - 00:30 0.50 CLEAN P DECOMP INSPECT EQUIPMENT AND PIPE SKATE. KEEPER PIN ON 4"DRILL PIPE ELEVATORS FOUND TO BE LOOSE. 00:30 - 02:30 2.00 CLEAN N SFAL DECOMP SERVICE RIG WHILE WAITING ON NEW 4" DRILL PIPE ELEVATORS TO BE DELIVERED FROM API. 02:30 - 03:30 1.00 CLEAN P DECOMP SINGLE IN WITH 4"DRILL PIPE IN ORDER TO HAVE ENOUGH DRILLPIPE IN THE DERRICK TO DRILL OUT ENTIRE 8.5"INTERMEDIATE SECTION. 03:30 - 04:30 1.00 CLEAN P DECOMP PULL OUT OF THE HOLE RACKING BACK 4" DRILL PIPE. 04:30 - 05:00 0.50 CLEAN P DECOMP CLEAN AND CLEAR THE RIG FLOOR OF ALL UN-NEEDED HANDLING EQUIPMENT AND PREPARE TO PICK UP WHIPSTOCK BHA. 05:00 - 07:30 2.50 STWHIP P DECOMP PICK UP WHIPSTOCK BHA. Printed 1/17/2011 11:01:40AM North America ALASKA- BP Page 5 of 22 Operation Summary Report . Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:00 0.50 STWHIP P DECOMP SHALLOW PULSE TEST MWD AT 400 GPM WTIH 350 PSI. 08:00 - 09:00 1.00 STWHIP P DECOMP PICK UP AND MAKE UP COLLARS AND HWDP FROM THE DERRICK. 09:00 - 10:30 1.50 STWHIP P DECOMP RUN IN THE HOLE TO 3088'ON 4"DRILL PIPE. 10:30 - 11:30 1.00 STWHIP P DECOMP ORIENT THE WHIPSTOCK TO 60 DEG RIGHT OF HIGH SIDE,TAG THE EZSV AT 3173',SET DOWN AND SET THE BOTTOM TRIP ANCHOR 28K. PULL 12K OVER TO VERIFY THE SET. SHEAR OFF THE BOLT AT 40K DOWN. UP WT. 100K/DOWN WT.95K 11:30 - 12:30 1.00 STWHIP P DECOMP DISPLACE WELL TO 9.8 PPG LSND AT 500 iPf/� GPM WITH 1300 PSI. MUD WT. IN AND OUT /� 9.8 PPG. 12:30 - 13:00 0.50 STWHIP P DECOMP ESTABLISH SPR'S AT 3125'MD,2860 TVD, WITH 9.8 PPG MUD. MUD PUMP#2 35 SPM AT 160 PSI ,45 SPM AT 220 PSI. 13:00 - 20:15 7.25 STWHIP P DECOMP MILL WINDOW FROM 3152'-3169'AND NEW FORMATION FROM 3169'TO 3194'AT 500 GPM WITH 1400 PSI,100 RPM WITH 2K-10K TQ,TOW-3152',MOW-3161',BOW-3169' WORKED MILL THROUGH THE WINDOW WITH AND WITHOUT ROTATION, NO DRAG. UP WT. lit 6 98K,DOWN WT.90K, ROT WT.95K FM - 21:00 0.75 STWHIP P DECOMP PUMP SUPER SWEEP SURFACE TO SURFACE TO CLEAN OUT ANY METAL SHAVINGS AT 500 GPM WITH 1500 PSI. CIRCULATE 1.5 BOTTOMS UP TO CLEAN UP THE HOLE. 21:00 - 22:00 1.00 STWHIP P DECOMP RIG UP AND PERFORM FIT TEST TO 225 PSI TO ESTABLISH 11.3 PPG EMW AT 2865'TVD WITH 9.8 PPG MUD IN AND OUT OF THE HOLE. ATTEMPTED 3 TIMES WITH TEST THAT WOULD BLEED OFF TO 0 PSI WITHIN 3 MINUTES. VERIFIED ALL SURFACE EQUIPMENT WHICH WAS GOOD. ATTEMPTED TEST FOR THE 4TH TIME WITH THE SAME RESULTS. 22:00 - 23:00 1.00 STWHIP N WAIT DECOMP CALLED ODE TO CONSULT ABOUT FIT. WAIT ON DECISION FROM TOWN. 23:00 - 23:30 0.50 STWHIP P DECOMP RIG UP AND PERFORM LOT. 23:30 - 00:00 0.50 STWHIP N WAIT DECOMP SENT LOT RESULTS TO TOWN ODE,OTL, AND ETL. WAITING ON DECISION OF LOT RESULTS. 11/7/2010 00:00 - 02:00 3.00 STWHIP N WAIT DECOMP WAIT ON ORDERS FROM TOWN ODE FOR DECISION ON LOT RESULTS. LOT OF 200 PSI WITH 9.8 PPG MUD WT.AT 2865'TVD;WHICH EQUALS 11.14 PPG EMW AS PER TOWN ODE. 02:00 - 03:00 1.00 DRILL P INT1 SPOT 40 BBL LCM PILL AT 5BPM WITH 400 PSI. -G-SEAL PLUS 10 PPB -M-I-X II M 15 PPB -SAFECARB 40 10 PPB -NUT PLUG FINE 5 PPB -UNANNOUNCED LOST CIRCULATION DRILL WITH NEUHARTH'S CREW. CRT 1 MIN,25 SEC Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 6 of 22 Operation Summary Report Common Well Name:J-20 I AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 06:30 3.50 DRILL P INT1 PULL OUT OF THE HOLE RACKING BACK THE 4"DRILL PIPE AND LAY DOWN THE WINDOW MILL BHA. MILLS IN GAUGE. TOTAL METAL BACK TO SURFACE 236 LBS. 06:30 - 07:00 0.50 DRILL P INT1 CLEAN AND CLEAR THE RIG FLOOR. PREPARE TO PICK UP THE DRILLING BHA. 07:00 - 08:00 1.00 DRILL P INT1 PULL THE BUSHING AND FLUSH OUT THE STACK. SET THE WEAR BUSHING AND BLOW DOWN THE TOP DRIVE. 08:00 - 11:00 3.00 DRILL P INT1 PJSM, MAKE UP 8.5"INTERMEDIATE DRILLING BHA AS FOLLOWS: -8.5"HYCALOG PDC DTX619M-D6 BIT SERIAL #130544 -7"1.3 DEGREE BEND MUD MOTOR -NON-MAG FLOAT SUB -NON-MAG INTEGRAL BLADE STAB. -NON-MAG 6.75"DM COLLAR -NON-MAG 6.75"DGR/EWR/PWD/DDS -NON-MAG 6.75"POS PULSER -NON-MAG FLEX COLLAR -NON-MAG FLEX COLLAR -NON-MAG FLEX COLLAR -UNANNOUNCED KICK DRILL WHILE MAKING UP BHA WITH NEUHARTH'S CREW. CRT 2 MIN. 11:00 - 11:30 0.50 DRILL P INT1 UPLOAD MWD 11:30 - 12:30 1.00 DRILL P INT1 CONTINUE TO MAKE UP THE BHA AS FOLLOWS: 3"X5"HWDP(3) -JAR -3"X 5"HWDP(14) -X-OVER SUB - 8.5 GHOST REAMER(2)LOCATED AT 2425.71'AND 4972.57'BEHIND THE BIT 12:30 - 12:45 0.25 DRILL P INT1 SHALLOW PULSE TEST THE MWD AT 500 GPM WITH 900 PSI. 12:45 - 14:00 1.25 DRILL P INT1 TRIP IN THE HOLE ON 4"DRILL PIPE TO 3089'. 14:00 - 14:30 0.50 DRILL P INT1 ORIENT TO 60 DEG RIGHT OF HIGH SIDE AND SLIDE THROUGH THE WINDOW WITH NO PROBLEMS. �1 14:30 00:00 9.50 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 3194 V TO 3933'. TVD 3430'. -UP WT.105K/DOWN WT.90K/ROT WT.98K -600 GPM AT 120 RPM WITH 3-4K TQ -CALC.ECD 10.14 PPG EMW/ACT.ECD 10.51 PPG EMW -ADT-3.93/AST-1.97/ART-1.96 -MUD WT IN 9.8 PPG/OUT 9.8+PPG 11/8/2010 00:00 - 06:30 6.50 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 3433' - TO 4685'. TVD 3988'. -UP WT. 107K/DOWN WT.95K/ROT WT. 103K -600 GPM AT 120 RPM WITH 3-4K TQ -CALC.ECD 10.18 PPG EMW/ACT.ECD 10.65 PPG EMW -MUD WT IN 9.9 PPG/OUT 9.9 PPG -ADT 3.49/AST.45/ART 3.04 06:30 - 07:30 1.00 DRILL P INT1 CIRCULATE AND CONDITION MUD AT 400 GPM WITH 1450 PSI. Printed 1/17/2011 11.01:40AM North America -ALASKA- BP Page 7 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 12:00 4.50 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 4685' TO 5048'. TVD 4254'. -UP WT. 120K/DOWN WT. 100K/ROT WT. 109K -600 GPM AT 80 RPM WITH 3-4K TQ -CALC. ECD 10.18 PPG EMW/ACT. ECD 10.56 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT 1.84/AST.61 /ART 1.23 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 5048' TO 6192'. TVD 5085'. -UP WT. 138K/DOWN WT. 104K/ROT WT. 119K -600 GPM AT 80 RPM WITH 3-4K TQ -CALC. ECD 10.18 PPG EMW/ACT. ECD 10.51 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT 6.37/AST 1.5/ART 5.33 11/9/2010 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 6192'- 7135'. -UP WT. 140K/DOWN WT. 106K/ROT WT. 119K -600 GPM AT 80 RPM WITH 3-4K TQ -CALC. ECD 10.36 PPG EMW/ACT. ECD 10.51 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT 5.36/AST.86/ART 4.50 10:00 - 10:45 0.75 DRILL P INT1 CIRCULATE BOTTOMS UP FOR ECD MANAGEMENT AT 600 GPM WITH 3100 PSI. ROTATING AT 120 RPM WITH 6.5K TQ 10:45 - 12:00 1.25 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 7135'- 7229'. -UP WT. 155K/DOWN WT. 110K/ROT WT. 130K -600 GPM AT 120 RPM WITH 5-7K TQ -CALC. ECD 10.34 PPG EMW/ACT.ECD 10.67 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT1.38/AST.19/ART1.19 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 7229'- 7987'. -UP WT. 175K/DOWN WT. 115K/ROT WT. 135K -615 GPM AT 120 RPM WITH 7-10K TQ -CALC. ECD 10.37 PPG EMW/ACT.ECD 10.61 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT 7.29/AST 1.45/ART 5.84 -HELD FIRE DRILL WITH WILLIAMS'CREW, CRT 1 MIN 26 SEC Printed 1/17/2011 11.01:40AM North America ALASKA-:BP Page 8 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/10/2010 00:00 - 12:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 7987'- 8476' -UP WT. 185K/DOWN WT. 118K/ROT WT. 145K -600 GPM AT 120 RPM WITH 8-10K TQ -CALC. ECD 10.41 PPG EMW/ACT. ECD 10.50 PPG EMW -MUD WT IN 9.8 PPG/OUT 9.8 PPG -ADT 7.25/AST 4.22/ART 3.03 -OBSERVED CONNECTION GAS AT 8476'. NO PIT GAIN OBSERVED. MUD WT.9.6 PPG ON NON-PRESSURIZED SCALE. 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 8476'- 9200' -UP WT. 195K/DOWN WT. 120K/ROT WT. 150K -600 GPM AT 120 RPM WITH 8-10K TQ -CALC.ECD 10.71 PPG EMW/ACT. ECD 11.07 PPG EMW -MUD WT IN 10.2 PPG/OUT 10.2 PPG ADT 7.66/AST 2.11 /ART 5.55 -BEGAN ADDING SPIKE FLUID TO TAKE MUD WT. FROM 9.8 PPG TO 10.2 PPG AT 8500'. 11/11/2010 00:00 - 12:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 9200'- 9951' -UP WT.204K/DOWN WT. 130K/ROT WT. 162K -600 GPM AT 120 RPM WITH 10-12K TQ -CALC. ECD 10.76 PPG EMW/ACT. ECD 11.01 PPG EMW -MUD WT IN 10.2 PPG/OUT 10.2 PPG -ADT 8.01 /AST.91 /ART 7.10 -AT 00:30 DUMPED 275 BBLS OF 10.2 PPG MUD OUT OF THE ACTIVE SYSTEM AND TOOK ON 290 BBLS OF NEW 10.2 PPG MUD. 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 9951'- 10504' -UP WT.227K/DOWN WT. 130K/ROT WT. 168K -575 GPM AT 120 RPM WITH 14-18K TQ -CALC.ECD 10.71 PPG EMW/ACT. ECD 10.85 PPG EMW -MUD WT IN 10.2 PPG/OUT 10.2 PPG -ADT 8.53/AST 2.94/ART 5.59 -KICK WHILE DRILLING DRILL WITH WILLIAM'S CREW. CRT 2 MIN 19 SEC. 11/12/2010 00:00 - 01:00 1.00 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 10504'- 10532' -UP WT.227K/DOWN WT. 130K/ROT WT. 16K -575 GPM AT 120 RPM WITH 14-18K TQ 1 -CALC. ECD 10.71 PPG EMW/ACT.ECD 10.85 PPG EMW -MUD WT IN 10.2 PPG/OUT 10.2 PPG -ADT.64/AST O/ART.64 01:00 - 02:30 1.50 DRILL P INT1 CIRCULATE FOR SAMPLES PER GEOLOGY. Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 9 of 22 Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 02:45 0.25 DRILL P INT1 DIRECTIONALLY DRILL AHEAD FROM 10532'- 10538' -UP WT.225K/DOWN WT.135K/ROT WT. 174K -575 GPM AT 120 RPM WITH 14-18K TQ -CALC.ECD 10.71 PPG EMW/ACT.ECD 10.83 PPG EMW MUD WT IN 10.2 PPG/OUT 10.2 PPG ADT'.14/AST 0/ART.14 02:45 - 04:15 1.50 DRILL P INT1 CIRCULATE FOR SAMPLES PER GEOLOGY. ■ TD CAI L ED AT 10538'MD 8532'TVD AS PER SLOPE AND TOWN GEOLOGIST. 04:15 - 08:45 4.50 DRILL P INT1 PUMP OUT OF THE HOLE AT 2 BPM WITH 300 PSI PULLING 90FT/MIN FROM 10538'TO 8078'. SHUT DOWN THE PUMPS AND PULL 3 MORE STANDS ON ELEVATORS. SAW 25K OVERPULL FOR THE FIRST 3 STANDS OFF BOTTOM. f 08:45 - 10:30 1.75 DRILL P ._ INT1 RUN IN THE HOLE TO 10538'WITH NO ISSUES. 10:30 - 12:15 1.75 DRILL P INT1 CIRCULATE BOTTOMS UP AT 13 BPM WITH 3800 PSI ROTATING AT 120 RPM WITH 14-15K TQ. 12:15 - 14:30 2.25 DRILL P . INT1 PUMP OUT OF THE HOLE AT 2 BPM WITH 300 PSI PULLING 90FT/MIN FROM 10538'TO 8641'. 14:30 - 18:45 4.25 DRILL P INT1 PULL OUT OF THE HOLE FROM 8641'TO 2620'. MUD WEIGHT IN AND OUT 10.2 PPG -KICK WHILE TRIPPING DRILL WITH WILLIAM'S CREW CRT 2 MIN 13 SEC 18:45 - 20:15 1.50 DRILL P INT1 SLIP AND CUT 72'OF DRILL LINE. 20:15 - 20:45 0.50 DRILL P -_ INT1 SERVICE THE TOP DRIVE AND DRAW WORKS. 20:45 - 22:00 1.25 DRILL P INT1 PULL OUT OF THE HOLE FROM 2620'TO 822'. 22:00 - 23:00 1.00 DRILL P -- INT1 PUMP DRY JOB AND CHANGE OUT TO 5" HANDLING EQUIPMENT. 23:00 - 00:00 1.00 DRILL P -_ INT1 LAY DOWN HWDP,JARS,AND 6 STANDS OF NON-MAG FLEX DRILL COLLARS. 11/13/2010 00:00 - 01:00 1.00 DRILL P INT1 DOWNLOAD THE MWD. 01:00 - 02:00 1.00 DRILL P ■- INT1 FINISH LAYING DOWN THE INTERMEDIATE DRILLING BHA. -BIT 1/8"UNDER GAUGE. 02:00 - 02:30 0.50 DRILL P ■ INT1 CLEAN AND CLEAR THE FLOOR OF ALL UN-NEEDED TOOLS FOR UPCOMING OPERATIONS. 02:30 - 04:30 2.00 CASING P ■ INT1 CHANGE OUT THE UPPER RAMS TO 7" C CASING RAMS AND MOBILIZE CASING EQUIPMENT AND TOOLS TO THE RIG FLOOR. 04:30 - 05:30 1.00 CASING P ■ INT1 TEST THE 7"CASING RAMS TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES. EACH TEST CHARTED AND PASSING. 05:30 08:00 2.50 CASING P INT1 RIG UP CASING EQUIPMENT TO RUN 7" CASING. INSTLL 12"ID WEAR BUSHING. 08:00 - 08:15 0.25 CASING P INT1 PJSM WITH RIG CREW,CASING CREW AND BAKER HAND. • Printed 1/17/2011 11:01:40AM • North America -ALASKA- BP Page 10 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To l Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:15 - 13:15 5.00 CASING P INT1 PICK UP SHOE TRACK,THREAD LOCK ALL JOINTS.CHECK FLOATS. RUN 7"L-80 26#VAM TOP LINER TO THE 9 5/8"WINDOWAT 3152'. FILL LINER WITH FRANKS FILL UP TOOL EVERY JOINT. HOLE TAKING CORRECT AMOUNT OF DISPLACEMENT. MAKE UP LINER TO 11,950 FT/LBS TORQUE /,( INSTALL STRAIGHT BLADE CENTRALIZERS ii)G" ON JOINTS 1 TO 8 13:15 - 14:00 0.75 CASING P INT1 CIRCULATE 1 1/2 BOTTOM UP VOLUMES AT 3 BPM WITH 350 PSI PJSM WITH CREW ON RIG DOWN FRANKS FILL UP TOOL. BRING TOOLS TO RIG FLOOR 14:00 - 22:15 8.25 CASING P INT1 RUN 7"L-80 26#VAM TOP LINER FROM THE 9 5/8"WINDOW AT 3152'TO 7506'. FILL LINER WITH FRANKS FILL UP TOOL EVERY JOINT. HOLE TAKING CORRECT AMOUNT OF DISPLACEMENT. MAKE UP LINER TO 11,950 FT/LBS TORQUE 22:15 - 23:00 0.75 CASING P -_ INT1 BAKER REP. MIX AND FILL PACKER WITH GEL AND ALLOW TO SET UP. 23:00 - 00:00 1.00 CASING P ■ INT1 MAKE UP CROSSOVER TO DRILL PIPE AND FIRST STAND OF 4"DRILLPIPE AND WASH DOWN THE LAST 40'AT 2 BPM WITH 350 PSI. 11/14/2010 00:00 - 01:00 1.00 CASING P INT1 RUN IN THE HOLE ON 4"DRILLPIPE AT 1'/SEC PUMPING AT 3 BPM WITH 350 PSI ON EVERY SIXTH JOINT FROM 7600'-8700'. 01:00 - 02:15 1.25 CASING P INT1 CIRCULATE BOTTOMS UP WHILE RECIPROCATING AT 8700'STAGING UP FROM 3 BPM WITH 350 PSI TO 5 BPM WITH 580 PSI. 02:15 - 05:00 2.75 CASING P INT1 RUN IN THE HOLE ON 4"DRILLPIPE AT 1'/SEC PUMPING AT 3 BPM WITH 350 PSI ON EVERY SIXTH JOINT FROM 8700'-10538'. RIG UP THE CEMENT HEAD AND TAG UP ON BOTTOM AT 10538'AND PICK UP 2'TO SET TH ► .• _ • . e.' . . •• AT 3040'. WASHING DOWN THE LAST 30'AT 3 BPM WITH 350 PSI. 05:00 - 08:00 3.00 CEMT P INT1 CIRCULATE BOTTOMS UP STAGING UP FROM 3 BPM WITH 650 PSI TO 5 BPM. CONDITION MUD TO 10.2 PPG IN AND OUT. PJSM WITH RIG CREW AND CEMENTING CREW. BATCH MIX 30 BBL 11.5 PPG MUD PUSH II.BATCH MIX 50 BBL 15.8 PPG CEMENT. Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 11 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations << (hr) (ft) 08:00 - 10:30 2.50 CEMT P INT1 SCHLUMBERGER CEMENTER UNIT PUMP 5 I• r BBL MUD PUSH.TEST LINES TO 4700 PSI. PUMP REMAINING 25 BBL MUD PUSH AT 4.5 c w•� BPM WITH 550 PSI PUMP 50_BBL(242 SX),.,1.16 CUFT/SX AT 15.8 PPG CLASS'G'CEMENT AT 4.5-13P1trtNi-T-H.600 PSI DROPPING TO 250 PSI. DROP PIPE WIPER DART. CEMENTERS PUMP OUT DART WITH 5 BBL FRESH WATER. GOOD INDICATION THAT DART LEFT HEAD. CHANGED OVER TO RIG PUMPS AND DISPLACED WITH 310 BBL 10.2 PPG Mc)AT 5 BPM. SLOW DISPLACEMENT TO 3 BPM. LATCH LINER WIPER PLUG ON CORRECT DISPLACEMENT AT 27 BBL.SHEAR WITH 950 PSI. CONTINUE DISPLACING AT 5 BPM WITH GRADUAL INCREASE OF PRESSURE TO 1550 PSI. FULL RETURNS THROUGH JOB. SLOW PUMP TO 3 BPM.BUMP PLUG WITH 2100 PSI ON TOTAL DISPLACEMENT OF 315 BBLS. "CEMENT IN PLACE AT 09:47 HRS** LINER HANGER SET AT 2100 PSI. SET DOWN TO CONFIRM. HRD-E ZXPN LINER TOP PACKER SET AT 2700 PSI.NO SURFACE INDICATION OF LINER TOP PACKER SET. REPEAT PRESSURE UP, NO INDICATION. PRESSURE UP TO 3500 PSI TO RELEASE RUNNING TOOL. PRESSURE UP TO 4500 PSI TO ACTIVATE NEUTRALIZER HYDRAULIC SETTING TOOL. CHECK FLOATS. HOLDING PICK UP 5'TO EXPOSE DOGS.SET DOWN TO SET LINER TOP PACKER.NO SURFACE INDICATION.REPEAT WITH ROTATION. CLOSE ANNULAR PREVENTOR AND PRESSURE UP 4"DRILL PIPE X 9 5/8" ANNULUS TO 500 PSI. NO PRESSURE LOSS. LINER TOP PACKER SET. 10:30 - 12:00 1.50 CEMT P INT1 PULL OUT OF PACKING IN LINER TOP. RIG DOWN LINES ON CEMENTING HEAD. CIRCULATE ONE BOTOMS UP AT 10 BPM WITH 650 PSI. NO CEMENT ON BOTTOMS UP. 12:00 - 14:00 2.00 CEMT P INT1 PULL OUT OF THE HOLE RACKING BACK THE 4"DRILL PIPE AND LAYDOWN THE PACKER RUNNING TOOL. DOGS SHEARED. 14:00 - 14:30 0.50 CEMT P INT1 CLEAR AND CLEAN THE RIG FLOOR. 14:30 - 15:00 0.50 BOPSUR P INT1 PULL WEAR RING AND SET THE TEST PLUG. ✓ 15:00 - 16:00 1.00 BOPSUR P INT1 CHANGE OUT THE 7"CASING RAMS WITH 3.5"X 6"VBRS. Printed 1/17/2011 11:01:40AM • North America -ALASKA- BP Page 12 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-OOXCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 21:00 5.00 BOPSUR P INT1 TEST BOPE WITH 2-7/8', 4"AND 4-1/2"TEST JOINTS TO A LOW 250 PSI/HIGH 3500 PSI, �� EXCEPT FOR ANNULAR WHICH WAS TESTED TO 2500 PSI. -EACH TEST CHARTED AND HELD FOR 5 1;5 MINUTES. TEST WITNESSED BY AOGCC REP CHUCK SCHEVE,BP WSLs DUNCAN FERGUSON AND CHRIS KOBUCK, DOYON TOOLPUSHERS CHARLIE HUNTINGTON AND VICTOR TORRES. 21:00 - 21:30 0.50 BOPSUR P INT1 INSTALL 9.125"WEAR BUSHING. 21:30 - 22:15 0.75 CASING P INT1 RIG UP AND TEST CASING TO 3500 PSI FOR 30 MINUTES CHARTED. GOOD TEST. NO PRESSURE LOST DURING TEST. 22:15 - 00:00 1.75 CASING P INT1 MAKE UP 6.125"PRODUCTION BHA AS FOLLOWS: -6.125"TRI-CONE SMITH XR20D BIT SERIAL# PN4866 -4.75"SPERRYDRILL LOBE 7/8-2.9 STAGE WITH 1.83 BEND -NON-MAG FLOAT SUB -NON-MAG 4.75"DM COLLAR -NON-MAG 4.75"SLIM PHASE 4 COLLAR -NON-MAG 4.75"ALD/CTN COLLAR 11/15/2010 00:00 - 00:30 0.50 CASING P INT1 PICK UP 6.125"BHA COMPONENTS AS FOLLOWS: -NON-MAG 4.75"PWD -NON-MAG POS PULSER -1 JOINT OF 4"DRILL PIPE. 00:30 - 01:00 0.50 CASING P INT1 SHALLOW PULSE TEST MWD AT 5 BPM WITH 1000 PSI. 01:00 - 03:30 2.50 CASING P INT1 LAYDOWN THE 1 JOINT OF DRILL PIPE AND CONTINUE TO MAKE UP THE BHA AS FOLLOWS: -(3)NON-MAG FLEX COLLARS -WELL COMMANDER CIRC SUB -X-OVER SUB -(3)4"X 2.5625"HWDP -BUMPER SUB -4"X 2.5625"HWDP -JAR -4"X 2.5625"HWDP 03:30 - 06:30 3.00 CASING P INT1 SINGLE IN THE HOLE WITH 4"DRILL PIPE FROM THE SHED 405'-3982'. 06:30 - 10:00 3.50 CASING P INT1 RIH FROM 3982'TO 10,375'WITH STANDS FROM THE DERRICK 10:00 - 12:00 2.00 DRILL P INT1 WASH DOWN AND TAG LANDING COLLAR AT 10,452' DRILL LANDING COLLAR 195 GPM, 1850 PSI, 30 RPM, 14K TORQUE, 10-12K WOB. -HELD SPILL DRILL WITH NEUHARTH'S CREW CRT 2 MIN 34 SEC. 12:00 - 13:00 1.00 DRILL P INT1 DRILL UP THE SHOE TRACK FROM 10452- 10526'. -195 GPM, 1700 PSI, 30 RPM, 14K TORQUE, 10-12K WOB. -UPWT215K/DOWN WT. 110K/ROT WT. 145K Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 13 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 15:45 2.75 DRILL P INT1 OPEN CIRC.SUB AND DISPLACE THE WELL TO 8.5 PPG FLO PRO AT 320 GPM WTIH 1300 PSI. DROP THE BALL AND CLOSE THE CIRC. SUB. 15:45 - 17:00 1.25 DRILL P INT1 ESTABLISH SPRS AND DRILL THE REMAINING FLOAT EQUIPMENT AND 20'OF NEW HOLE. CIRCULATE THE HOLE CLEAN AT 193 GPM WITH 1300 PSI,40 RPM,WITH 3-4K TQ. -HELD KICK WHILE DRILLING DRILL WITH WILLIAMS CREW CRT 1 MIN 37 SEC 17:00 - 18:00 1.00 DRILL P INT1 RIG UP AND PERFORM FIT TEST TO 9.6 PPG EMW. 8.5 PPG FLO PRO,10563'MD,8550' TVD,495 PSI ON SURFACE. 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10563'- 10654' -UP WT. 175K/DOWN WT. 140K/ROT WT. 156K -200 GPM AT 50 RPM WITH 3-4K TQ -CALC. ECD 9.35 PPG EMW/ACT. ECD 9.43 PPG EMW -MUD WT IN 8.5 PPG/OUT 8.5 PPG -ADT 5.34/AST 2.26/ART 3.08 11/16/2010 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10,654' MD-10,945'MD. -UP WT. 182K/DOWN WT. 140K/ROT WT. 157K -250 GPM,1900 PSI -50 RPM,TQ 5K ON,TQ 3K OFF -WOB 15-20K -CALC. ECD 9.35 PPG EMW/ACT.ECD 9.36 PPG EMW -MUD WT IN 8.5 PPG/OUT 8.5 PPG HELD KICK WHILE DRILLING DRILL WITH NEUHARTH CREW(D2),CRT 107 SEC. 12:00 - 18:30 6.50 DRILL P PROD1 r1IRFOTIONAI LY DRII L AHFAD FROM 10 945' MD-10,995'MD. -UP WT. 180K/DOWN WT. 140K/ROT WT. 155K -250 GPM,1800 PSI -WOB 10-15K -CALC. ECD 9.35 PPG EMW/ACT. ECD 9.36 PPG EMW -ART 1.46 HRS,AST 8.97 HRS,ADT 10.43 HRS -MUD WT IN 8.5 PPG/OUT 8.5 PPG UNANNOUNCED KICK WHILE DRILLING DRILL WITH WILLIAMS CREW(D2),CRT 90 SEC. 18:30 - 19:15 0.75 DRILL P PROD1 OBSERVE DECREASE IN PENETRATION RATE AND PRESSURE SPIKES.CIRCULATE WHILE TROUBLESHOOTING. DECISION MADE TO PULL OUT OF HOLE AND SWAP BHA. 19:15 - 20:45 1.50 DRILL P PROD1 PULL 1 STAND OF DP AND HOLE SWABBING. PUMP OUT 4 STANDS OF DP AND LOSE 10 BBLS OF FLUID.PULL 1 MORE STAND TO 10,375'MD AND HOLE SWABBING. INCORRECT HOLE FILL,TRIP BACK TO BOTTOM.MONITOR WELL-STATIC. Printed 1/17/2011 11:01:40AM North America -ALASKA- BP g Page 14 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr (ft) 20:45 22:00 1.25 DRILL P ■- PROD1 CIRCULATE ETURN TE BOTTOMS B BOTTOMS UP.U . CHANGE IN RETURNS ON BOTTOMS UP. -250 GPM,1800 PSI 22:00 - 00:00 2.00 DRILL P PROD1. PUMP OUT OF HOLE FROM 10,995'MD TO 9,998'MD. -100 GPM,700 PSI PULL OUT OF HOLE FROM 9,998'MD TO 9809' MD. 11/17/2010 00:00 - 03:30 3.50 DRILL P ■ PROD1 PULL OUT OF HOLE FROM 9,998'MD TO TOP OF BHA OF AT 400'MD. MUD WEIGHT IN AND OUT 8.6 PPG 03:30 - 04:30 1.00 DRILL P PROD1 LAY DOWN DRILL COLLARS AND MWD TOOLS. UP LOAD MWD PJSM ON HANDLING NUKES. REMOVE NUCLEAR SOURCE. 04:30 - 07:00 2.50 DRILL P PROD1 LAY DOWN THE REST OF THE BHA. DECISION MADE TO CHANGE OUT ALL MWD COMPONENTS. HOLE TAKING CORRECT AMOUNT OF FILL. BIT CONDITION 7-8-BT-A-E-4-LT-PR 07:00 - 07:30 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR 07:30 - 09:00 1.50 DRILL P PROD1 MAKE UP NEW TRICONE BIT ON SAME 1.83 DEG BEND MOTOR 09:00 - 10:30 1.50 DRILL P PROD? DOWN LOAD MWD 10:30 - 12:30 2.00 DRILL P PROD1 SHALLOW TEST MWD.ORDERS FROM SPERRY TO CHANGE PROBE LAY DOWN NM FLEX DC. CHANGE OUT PROBE UP LOAD MWD. 12:30 - 13:00 0.50 DRILL P -_ PROD1 PULSE TEST MWD AT 230 GPM WITH 850 PSI 13:00 - 13:30 0.50 DRILL P -_ PROD1 PJSM ON HANDLING NUKES.LOAD SOURCES. 13:30 - 14:00 0.50 DRILL N PROD1 PICK UP THE REST OF THE BHA. 14:00 - 15:30 1.50 DRILL P PROD1 RIH WITH DRILL PIPE TO 5111'. WIND AND SNOW INCREASING IN INTENSITY.UNSAFE FOR THE DERRICK MAN TO CONTINUE WORK IN THE DERRICK. BLOW DOWN TOP DRIVE. RELEASE ALL NON ESSENTIAL PERSONAL TO RETURN TO CAMP DUE TO PENDING PHASE 3 WEATHER FAST APPROACHING. KEEP HOLE FILL PUMP ON.SET HIGH AND LOW ALARMS AT 1 BBL.DRILLER TEST AUDIO AND VISUAL ALARMS. 15:30 - 22:00 6.50 DRILL N WAIT _ PROD1 WAIT ON WEATHER. PHASE II LEVEL II CONDITIONS. 22:00 - 00:00 2.00 DRILL P -_ PROD1 CONTINUE RIH WITH BHA ON 4"DP TO 9621'. FILLED DP AT 7460'. 11/18/2010 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUE RIH WITH BHA ON 4"DP TO 10465'. 01:00 02:30 1.50 DRILL P ■- PROD1 SLIP AND CUT DRILLING LINE. SERVICE TOP DRIVE AND DRAWWORKS. WAIT ON WEATHER. PHASE II LEVEL II. V Printed 1/17/2011 11:01:40AM North America -ALASKA-BP Page 15 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 05:30 3.00 DRILL N WAIT PROD1 WAIT ON WEATHER. PHASE II LEVEL II. ROADS AND PADS HOLDING TRAFFIC TO A STOP DUE TO ROAD CONDITIONS. UNABLE TO INITIATE DRILLING OPERATIONS DUE TO UNAVAILABILITY OF TRUCKING FOR FLUID SUPPORT. 05:30 - 07:30 2.00 DRILL P PROD1 RIH WITH BHA ON 4"DRILL PIPE TO 10751' WASH AND REAM TO 10942' 220 GPM 1550 PSI 2-4K WOB SLIDING WITH VERY LITTLE ROTATION OBSERVE UNDERGAUGE HOLE AT 10942' WASHED AWAY QUICKLY. WASH TO BOTTOM AT 10995' SLIDING,DIFFICULT TO ROTATE. 07:30 - 12:00 4.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 10,995' MD-11,093'MD. -UP WT. 185K/DOWN WT. 133K/ROT WT. 156K -270 GPM,2100 PSI -WOB 15-20K -CALC. ECD 9.35 PPG EMW/ACT.ECD 9.43 PPG EMW -MUD WT IN 8.6 PPG/OUT 8.6 PPG 12:00 - 00:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,093 MD-11,382'MD. -UPWT. 195K/DOWN WT. 135K/ROT WT. 158K -270 GPM,2150 PSI -45 RPM,TQ ON 6-8K,TQ OFF 5-7K -WOB 20K -CALC. ECD 9.53 PPG EMW/ACT. ECD 9.54 PPG EMW -ART 1.85 HRS,AST 8.56 HRS,ADT 10.41 HRS -MUD WT IN 8.6 PPG/OUT 8.6 PPG 11/19/2010 00:00 - 01:30 1.50 DRILL P PROD1 DRILL AHEAD IN 6.125"HOLE SECTION FROM 11,382'MD-11450'MD. -270 GPM,2150 PSI -45 RPM,TQ ON 6-8K -WOB 20K -MUD WT IN 8.6 PPG/OUT 8.6 PPG 01:30 - 02:30 1.00 DRILL P PROD1 ENCOUNTER TIGHT HOLE WHILE BACK REAMING STAND FROM 11,450'MD-11,430' MD. REAM INTERVAL UNTIL TORQUE VALUES CONSTANT. -30K OVERPULLS -6K-8K TORQUE SPIKES MIX AND PUMP 35 BBL HI-VIS SWEEP. OBSERVE INCREASE IN VOLUME AND SIZE OF CUTTINGS WHEN SWEEP RETURNED TO SURFACE. 02:30 - 12:00 9.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,450' MD-11,778'MD. -UP WT.200K/DOWN WT. 160K/ROT WT. 128K -270 GPM,2100 PSI -45 RPM,TQ ON 7-8K,TQ OFF 6-8K -WOB 10-20K -CALC. ECD 9.56 PPG EMW/ACT. ECD 9.62 PPG EMW -MUD WT IN 8.6+PPG/OUT 8.6+PPG Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 16 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 11/1/2010 I End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.:DOYON 141 Spud Date/Time:8/1/1996 12:00.00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 23:30 11.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 11,778' MD- 12154'MD. -UP WT. 190K/DOWN WT. 132K/ROT WT. 159K 270 GPM,2200 PSI -45 RPM. TO ON 7-8K TQ OFF 6-7K -WOB 10-20K CALC. ECD 9.60 PPG EMW/ACT. ECD 9.60 PPG EMW -ART 10.69 HRS.AST 3.53 HRS,ADT 14.22 HRS -MUD WT IN 8.6+PPG/OUT 8.6+PPG 23:30 - 00:00 0.50 DRILL P PROD1 CIRCULATE BOTTOMS UP. 270 GPM,2100 PSI -60 RPM,TQ 6-7K 11/20/2010 00:00 - 01:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP. -270 GPM,2100 PSI -60 RPM,TQ 6-7K MONITOR WELL-STATIC.MUD WT IN 8.6+ PPG/OUT 8.6+PPG 01:00 - 02:30 1.50 DRILL P PROD1 PULL OUT OF HOLE ON ELEVATORS FROM 12,154'MD TO SHOE AT 10,536'MD. -UP WT. 195K MONITOR WELL-STATIC.MUD WT IN 8.6+ PPG/OUT 8.6+PPG 02:30 - 06:30 4.00 DRILL P PROD1 PUMP DRY JOB. PULL OUT OF HOLE ON ELEVATORS TO BHA AT 405' -UP WT.180K 06:30 - 07:30 1.00 DRILL P PROD1 STAND BACK HWDP,LAY DOWN NMDC. PJSM ON HANDLING NUKES.UNLOAD NUKES. KICK WHILE TRIPPING DRILL(D1). 07:30 - 08:30 1.00 DRILL P PROD1 DOWN LOAD MWD. 08:30 - 09:30 1.00 DRILL P PROD1 STAND BACK REST OF BHA. LAY DOWN MOTOR AND FLOAT. LAY DOWN BIT.CLEAN AND CLEAR RIG FLOOR. BIT GRADED AS:3-4-WT-A-E-I-BT-BHA 09:30 - 11:00 1.50 DRILL P PROD1 MAKE UP NEW BHA WITH 5"MOTOR,SET AT 1.75 DEG BENT HOUSING AND NEW PDC BIT. CHANGE PULSER,LAY DOWN PWD.EMPTY BALLS FROM CCV. -6.125"HTC HCD505Z PDC BIT 11:00 - 12:00 1.00 DRILL P PROD1 UPLOAD MWD. MONITOR WELL FROM TRIP TANK. 12:00 - 13:30 1.50 DRILL P PROD1 SHALLOW HOLE TEST MWD TOOLS.TEST- GOOD. HOLD PJSM. LOAD NUCLEAR SOURCE. CONTINUE TO MAKE UP BHA. Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 17 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor:DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual©68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:30 - 20:00 6.50 DRILL P PROD1 RUN IN HOLE WITH 4"DP.FILL PIPE EVERY 20 STANDS. UNANNOUNCED KICK WHILE TRIPPING DRILL (D1). 20:00 - 00:00 4.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 12,154' MD-12,279'MD. -UP WT. 195K/DOWN WT. 128K/ROT WT. 158K -300 GPM,2200 PSI -70 RPM,TQ ON 7-8K,TQ OFF 6-7K -WOB 3-7K -ART.48 HRS,AST 1.17 HRS,ADT 1.65 HRS -MUD WT IN 8.6+PPG/OUT 8.6+PPG 11/21/2010 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 12,279' MD-12,556'MD/9,026'TVD -UP WT. 198K/DOWN WT. 130K/ROT WT. 160K -320 GPM,2400 PSI -70 RPM,TQ ON 8K,TQ OFF 7K -WOB 2-10K -ART 3.81 HRS,AST 3.77 HRS,ADT 6.28 HRS -MUD WT IN 8.7 PPG/OUT 8.7 PPG 12:00 - 15:15 3.25 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 12,556' MD-12,564'MD/9,026'TVD -UP WT. 198K/DOWN WT. 130K/ROT WT. 160K -300 GPM,2400 PSI -70 RPM,TQ ON 8K,TQ OFF 7K -WOB 7-25K -ART.44 HRS,AST.26 HRS,ADT.7 HRS -MUD WT IN 8.7 PPG/OUT 8.7 PPG 15:15 - 15:30 0.25 DRILL N DFAL 12,563.97 PROD1 MONITOR WELL-STATIC. RECORD SLOW PUMP RATES.BLOW DOWN TOP DRIVE. 15:30 - 21:15 5.75 DRILL N DFAL 12,563.97 PROD1 PULL OUT OF HOLE ON ELEVATORS, PULL BHA INTO 7"SHOE AT 10,536'MD.MONITOR WELL-STATIC. PUMP DRY JOB. BLOW DOWN TOP DRIVE. PULL OUT OF HOLE TO TOP OF BHA AT 388' MD.MONITOR WELL-STATIC. 21:15 - 21:45 0.50 DRILL N DFAL 12,563.97 PROD1 RACK BACK JARS AND 4"HWDP. LAY DOWN MULTI CYCLE CIRC SUB AND DRILL COLLARS. 21:45 - 22:15 0.50 DRILL N DFAL 12,563.97 PROD1 HOLD PJSM ON HANDLING NUCLEAR SOURCE.REMOVE NUCLEAR SOURCE. 22:15 - 23:00 0.75 DRILL N DFAL 12,563.97 PROD1 LAY DOWN DRILL COLLAR.DOWNLOAD MWD TOOLS. MONITOR WELL FROM TRIP TANK. 23:00 - 00:00 1.00 DRILL N DFAL 12,563.97 PROD1 RACK BACK MWD TOOLS. PULL BIT AND MOTOR ABOVE ROTARY. BREAK BIT AND LAY DOWN MOTOR. -BIT GRADE:8-8-RO-A-X-2-CR-PR -NOTE:3"OF MATRIX ON BIT WORN OFF. son � PERFORM WEEKLY BOP FUNCTION TEST. r C Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 18 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) (ft) 11/22/2010 00:00 - 01:30 1.50 DRILL N DFAL 12,563.97 PROD1 MAKE UP NEW BHA WITH 5"MOTOR,SET AT 1.5 DEG BENT HOUSING AND NEW TRI-CONE BIT. -6.125"HTC EP7258 BIT 01:30 - 02:15 0.75 DRILL N DFAL 12,563.97 PROD1 UPLOAD MWD. MONITOR WELL FROM TRIP TANK. 02:15 - 04:00 1.75 DRILL N DFAL 12,563.97 PROD1 SHALLOW HOLE TEST MWD TOOLS.TEST- GOOD. HOLD PJSM. LOAD NUCLEAR SOURCE. CONTINUE TO MAKE UP BHA. 04:00 - 09:30 5.50 DRILL N DFAL 12,563.97 PROD1 RUN IN HOLE WITH 4"DP TO 10180' -MUD WEIGHT IN AND OUT 8.6 PPG 09:30 - 10:30 1.00 DRILL P PROD1 SLIP AND CUT DRILLING LINE.PJSM WITH CREW,PREPARE TOOLS FOR JOB. 10:30 - 11:00 0.50 DRILL P PROD1 UNANNOUNCED KICK DRILL WHILE CUTTING AND SLIPPING DRILLING LINE. AAR HELD WITH ALL HANDS INCLUDING WSL, TOOL PUSHER AND DRILLING SUPERINTENDENT. 11:00 - 11:30 0.50 DRILL P PROD1 SERVICE RIG AND TOP DRIVE 11:30 - 12:30 1.00 DRILL N DFAL 12,563.97 PROD1 RIH TO 12430'WITH 4"DRILL PIPE 12:30 - 13:30 1.00 DRILL N DFAL 12,563.97 PROD1 WASH LAST 140'TO BOTTOM AS PRECAUTION.TAG BOTTOM. If PICK UP 20'AND WASH TWICE AS PRECAUTION TO CLEAR BOTTOM. 13:30 - 00:00 10.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 12,564' MD-12,982'MD/9,027'TVD -UP WT.200K/DOWN WT. 125K/ROT WT. 157K -270 GPM,2300 PSI -70 RPM,TQ ON 8.5K,TQ OFF 7.5K -WOB 15K -ART 6.52 HRS,AST.94 HRS,ADT 7.46 HRS -MUD WT IN 8.7 PPG/OUT 8.7 PPG 11/23/2010 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 12,982' MD-13,275'MD. -UP WT.200K/DOWN WT. 125K/ROT WT. 155K -270 GPM,2400 PSI -80 RPM,TQ ON 8K,TQ OFF 7K -WOB 10-20K -ART 6.98 HRS,AST 1.09 HRS,ADT 8.07 HRS -MUD WT IN 8.7 PPG/OUT 8.7 PPG V Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 19 of 22 Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release. 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 16:45 4.75 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 13,275' MD-13,396'MD/9,028 TVD -UP WT.200K/DOWN WT. 125K/ROT WT. 157K -270 GPM,2400 PSI -75 RPM,TQ ON 8.5K,TQ OFF 7K -WOB 10-17K --ART 3.39 HRS,AST.83 HRS,ADT 4.22 HRS OBSERVE PENETRATION RATE DECREASE TO 25'PER HOUR,DIFFICULTY TRANSFERRING WEIGHT TO BIT,AND 20K- 30K OVER PULLS WHEN PICKING UP AFTER SLIDING.DECISION MADE TO PULL OUT OF HOLE AND SWAP BIT. -MUD WT IN 8.7 PPG/OUT 8.7 PPG 16:45 - 18:15 1.50 DRILL P PROD1 CIRCULATE BOTTOMS UP. -270 GPM,2375 PSI 80 RPM,TQ 6.5K MONITOR WELL-STATIC.MUD WT IN 8.7 PPG /OUT 8.7 PPG 18:15 - 19:30 1.25 DRILL N DFAL 13,395.97 PROD1 PULL OUT OF HOLE FROM 13,393'MD TO 11,771'MD ON ELEVATORS. -UP WT.200K 19:30 - 00:00 4.50 DRILL P PROD1 MAD PASS ACROSS BUILD SECTION FROM 11,771'MD-10,975'MD AT 300'PER HOUR. -250 GPM,2000 PSI -30-75 RPM,TO 6-7K -UP WT.200K 11/24/2010 00:00 - 02:00 2.00 DRILL P PROD1 MAD PASS ACROSS BUILD SECTION FROM 10,975'-10,700'MD AT 300'PER HOUR. -250 GPM,2000 PSI -30-75 RPM,TQ 6-7K -UP WT.200K 02:00 - 02:30 0.50 DRILL N DFAL 13,395.97 PROD1 PULL OUT OF HOLE ON ELEVATORS TO 7" SHOE AT 10,536'MD.MONITOR WELL- STATIC. PUMP DRY JOB.BLOW DOWN TOP DRIVE. 02:30 - 06:30 4.00 DRILL N DFAL 13,395.97 PROD1 PULL OUT OF HOLE ON ELEVATORS TO BHA AT 395'MD. MONITOR HOLE FILL THROUGH TRIP TANK. UD 2 NMFDC TO 130'. 06:30 - 07:00 0.50 DRILL N DFAL 13,395.97 PROD1 PJSM-HANDLING NUKE SOURCES. CLEAR FLOOR AND CELLAR AND POST WATCHES TO RESTRICT ACCESS TO RIG FLOOR. MWD TECHS UNLOAD NUKES. 07:00 - 08:30 1.50 DRILL N DFAL 13,395.97 PROD1 UPLOAD MWD DATA. 08:30 - 09:00 0.50 DRILL N DFAL 13,395.97 PROD1 L/D TM COLLAR AND MUD MOTOR WITH 6-1/8" BIT. PIPE DISPLACEMENT CALC. ON TRIP= 64.75-BBLS. LOST 11-BBLS.MUD TO HOLE ON TRIP OUT. 09:00 - 10:00 1.00 DRILL N DFAL 13,395.97 PROD1 CLEAR AND CLEAN RIG FLOOR. SERVICE RIG. Printed 1/17/2011 11:01:40AM Page 20 of 22' North America -ALASKA- BP Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 00:00 14.00 DRILL N RREP PROD1 TROUBLESHOOT TOP DRIVE HYDRAULIC OIL LEAK. REMOVE ELEVATORS AND BAILS, QUILL STEM, PH-50 PIPE HANDLER,LINK TILT ACTUATOR, HYDRAULIC HOSES,DRAIN GEAR OIL. REPLACE TOP ROTATING ASSEMBLY. REINSTALL ALL TOP DRIVE ACCESSORIES. TORQUE AND WIRE TIE ALL FASTENERS. MONITOR WELL VIA TRIP TANK. FLUID LOSSES= 1-2 BPI-I.TOTAL LOSSES FOR 24-HRS.=24-BBLS. 11/25/2010 00:00 - 06:30 6.50 DRILL N RREP PROD1 CONTINUE REINSTALLING TOP DRIVE ACCESSORIES. FILL WITH LUBE OIL AND HYDRAULIC FLUID. FUNCTION TEST TD AND VERIFY NO LEAKS. INSTALL LINK TILT ACCESSORIES AND SET LINK TILT DISTANCE.MAKE UP UPPER AND LOWER IBOP TO QUILL SHAFT.MAKE UP NEW SAVER SUB TO LOWER IBOP. PERFORM OPERATIONS TEST ON ALL FUNCTIONS. RECHECK ALL FLUID LEVELS. CHECK ALL OPERATIONS A SECOND TIME. 06:30 - 08:30 2.00 DRILL N RREP PROD1 INSTALL ELECTRICAL AND GEAR CASE GUARDS.HANG BAILS,ELEVATORS,AND CHECK LINK TILT ADJUSTMENT. PRESSURE TEST QUILL CONNECTIONS TO 3000 PSI FOR 5 CHARTED MINUTES. 08:30 - 09:15 0.75 DRILL N DFAL PROD1 PICK UP MOTOR. BREAKOUT UNDERGUAGE BIT. -BIT GRADE:4-6-WT-A-E-4-LT-PR 09:15 - 10:00 0.75 DRILL .. N DFAL PROD1 MAKE UP BHA WITH 5"MOTOR,SET AT 1.5 DEG BENT HOUSING AND NEW TRI-CONE BIT. MAKE UP MWD BHA. -6.125"HTC EP7064 BIT 10:00 - 11:00 1.00 DRILL N RREP _ PROD1 DECISION MADE TO LAY DOWN MOTOR AND MWD TOOLS AND TEST BOPE. 11:00 - 11:30 0.50 BOPSUR P -_ PROD1 DRAIN BOP STACK.PULL WEAR BUSHING. SET TEST PLUG. 11:30 - 12:00 0.50 BOPSUR P PROD1 RIG UP BOP TEST EQUIPMENT. 12:00 - 16:45 4.75 BOPSUR P PROD1 TEST BOPE WITH 2-7/8"AND 4.5"TEST JOINTS TO A LOW 250 PSI/HIGH 3500 PSI, EXCEPT FOR ANNULAR BAG.TEST ANNULAR BAG TO 2500 PSI. -EACH TEST CHARTED AND HELD FOR 5 MINUTES. / TEST WITNESSED BY WSL RICHARD BORDES AND TOOLPUSHER PAT KRUPA. -AOGCC REP.JOHN CRISP WAIVED WITNESS OF BOPE TEST 16:45 - 18:15 1.50 BOPSUR P PROD1 RIG DOWN BOP TESTING EQUIPMENT. BLOW DOWN CHOKE MANIFOLD,CHOKE LINES, AND KILL LINES. PULL TEST PLUG. INSTALL WEAR RING. V Printed 1/17/2011 11:01:40AM e 21 of 22: merlca-ALASIKa- BP N', �� .,mart' Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3-00XCG-C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor. DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:15 - 20:15 2.00 DRILL N DFAL 13,395.97 PROD1 PICK UP BHA. PICK UP 5"MOTOR,SET AT 1.5 DEG BENT HOUSING AND WITH 6.125" TRI-CONE BIT. -6.125"HTC EP7064 BIT SHALLOW HOLE TEST MWD TOOLS.TEST- GOOD. INSPECT MUD MOTOR DURING SHALLOW HOLE TEST. -220 GPM,775 PSI 20:15 - 21:00 0.75 DRILL N DFAL 13,395.97 PROD1 UPLOAD MWD TOOLS WITH DRILLING PARAMETERS. 21:00 - 22:15 1.25 DRILL N DFAL 13,395.97 PROD1 HOLD PJSM.LOAD NUCLEAR SOURCE. PICK UP 3-FLEX DRILL COLLARS.PICK UP MULTI-CYCLE CIRCULATION SUB,4"HWDP, AND JARS. 22:15 - 00:00 1.75 DRILL N DFAL 13,395.97 PROD1 RUN IN HOLE WITH 6.125"DRILLING BHA ON 4"DP TO 6,042'MD. -FILL PIPE EVERY 20 STANDS -HOLD KICK WHILE TRIPPING DRILL(D1) CRT=90 SEC. 11/26/2010 00:00 - 03:30 3.50 DRILL N DFAL 13,395.97 PROD1 RUN IN HOLE WITH 6.125"DRILLING BHA ON 4"DP FROM 6,042'MD TO 13,090'MD. -FILL PIPE EVERY 20 STANDS 03:30 - 05:30 2.00 DRILL N DFAL 13,395.97 PROD1 BREAK CIRCULATION. -175 GPM,1800 PSI WASH AND REAM FROM 13,090'MD TO 13,396'MD. -250 GPM,2210 PSI -40 RPM,TQ 7.5K 05:30 - 00:00 18.50 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 13,396' MD-13,930'MD. -UP WT. 185K/DOWN WT. 115K/ROT WT. 145K -270 GPM,2300 PSI -80 RPM,TQ ON 9.7K,TQ OFF 8.8K -WOB 10-20K -ART 8.6 HRS,AST 4.49 HRS,ADT 13.09 HRS -MUD WT IN 8.5 PPG/OUT 8.5 PPG 11/27/2010 00:00 - 13:00 13.00 DRILL P PROD1 DIRECTIONALLY DRILL AHEAD FROM 13,930' MD TOWARDS PLANNED TD OF 14,295'. -UP WT.203K/DOWN WT. 125K/ROT WT. 160K -270 GPM, PSI -90 RPM,TQ O ON 9.7K,TQ OFF 8.0K -WOB 15-17K -ART 8.97 HRS,AST 1.28 HRS,ADT 10.25 HRS -MUD WT IN 8.7 PPG/OUT 8.7 PPG HELD KICK WHILE DRILLING DRILL(D2),CRT 70 SEC. 13:00 - 13:30 0.50 DRILL P PROD1 BACK REAM LAST STAND.TAKE SURVEY. RECORD SLOW PUMP RATES. 13:30 - 15:00 1.50 DRILL P PROD1 CIRCULATE HOLE CLEAN. -270 GPM,2000 PSI -90 RPM,TQ 8.0K 15:00 - 15:15 0.25 DRILL P PROD1 MONITOR WELL-SLIGHT LOSS OBSERVED. BLOW DOWN TOP DRIVE. Printed 1/17/2011 11:01:40AM / Page 22 of 22 North America -ALASKA- BP Operation Summary Report Common Well Name:J-20 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 11/1/2010 End Date: 11/28/2010 X3 0OXCG C(4,284,567.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:15 - 17:15 2.00 DRILL P PROD1 PULL OUT OF HOLE ON ELEVATORS TO 7" SHOE AT 10,536'MD. 17:15 - 18:30 1.25 DRILL P PROD1 MONITOR WELL-SLIGHT LOSS OBSERVED. DROP BALL TO OPEN CIRC SUB AT 80 GPM, 650 PSI.OPEN CIRC SUB WITH 2350 PSI. CIRCULATE CASING CLEAN.STAGE PUMPS UP FROM 300 GPM,1000 PSI TO 600 GPM, 2100 PSI. 18:30 - 18:45 0.25 DRILL P PROD1 MONITOR WELL-SLIGHT LOSS OBSERVED. PUMP DRY JOB.BLOW DOWN TOP DRIVE. DROP 2"RABBIT WITH 100'WIRELINE TAIL. 18:45 - 22:15 3.50 DRILL P PROD1 PULL OUT OF HOLE RACKING BACK 4"DRILL PIPE FROM 10,536'MD TO BHA AT 395'MD. 25 BBLS OF FLUID LOST ON TRIP. 22:15 - 23:15 1.00 DRILL P PROD1 MONITOR WELL-SLIGHT LOSS OBSERVED. LAY DOWN BHA. HOLD PJSM AND UNLOAD NUCLEAR SOURCES.LAY DOWN FLEX DRILL COLLAR. 23:15 - 00:00 0.75 DRILL P PROD1 DOWNLOAD MWD TOOLS. DAILY FLUID LOSS-30 BBLS FLO PRO 11/28/2010 00:00 - 00:45 0.75 DRILL P PROD1 LAY DOWN MOTOR AND BIT. -BIT GRADE:2-6-WT-A-E-4-LT-TD Printed 1/17/2011 11:01:40AM North America -ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI: 500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/28/2010 00:45 - 02:30 1.75 CASING P RUNPRD EXPEDITE 4.5"LINER RUNNING •UIPMENT TO RIG FLOOR.RIG UP CASING TONGS. CHANGE ELEVATORS. 02:30 - 03:30 1.00 CASING P RUNPRD HOLD PJSM.MAKE UP 4.5"12.6#L-80 IBT-M LINER SHOE TRACK. BAKER-LOK THREADS AND CHECK FLOATS. -MAKE UP THREADS TO MARK -PLACE ONE CENTRALIZER PER JOINT ON THE SHOE TRACK 03:30 - 06:30 3.00 CASING P RUNPRD RUN IN HOLE WITH 4.5"12.6#L-80 IBT-M LINER -USE BOL 2000 NM ON ALL CONNECTIONS -MAKE UP THREADS TO MARK -FILL EACH JOINT PLACE 2 FREE FLOATING CENTRALIZERS WITH STOP RINGS IN MIDDLE OF EACH JOINT. NO CENTRALIZERS PLACED ON JOINTS THAT WILL BE BETWEEN 50'ABOVE AND BELOW THE WINDOW. 06:30 - 08:00 1.50 CASING P RUNPRD CHANGEOUT ELEVATORS FROM 4-1/2"YT'S TO 4"DP ELEVATORS. PUMU 7"X 4-1/2" LINER HANGER AND LINER TOP PACKER ASSEMBLY. 08:00 - 08:30 r 0.50 CASING P RUNPRD CIRCULATE 2X 4-1/2"LINER VOLUMES AT 4.0-BPM AT 450-PSI. -PUW=75K,SOW=70K 08:30 - 13:15 4.75 CASING P RUNPRD CONTINUE RUNNING IN HOLE WITH 4.5"12.6# L-80 IBT-M LINER ON 4"DP FROM DERRICK TO 10,516'. -USE BOL 2000 NM ON ALL CONNECTIONS -MAKE UP THREADS TO MARK -FILL PIPE EVERY 10 STANDS RIH FROM DERRICK. -LOSSES TO WELL=2.0-BPH 13:15 - 14:30 1.25 CASING P RUNPRD CIRCULATE 1.5X DP AND LINER VOLUME AT 7"CASING SHOE. -STAGED PUMPS FROM 30-SPM/575-PSI TO 59-SPM/850-PSI. -BLEW DOWN TOP DRIVE. 14:30 - 17:45 3.25 CASING P RUNPRD CONTINUE RIH WITH 4.5"12.6#L-80 IBT-M LINER ON 4"DP FROM DERRICK FROM 10,516'TO 14,272'. PUW=166K,SOW= 122K. 17:45 - 18:15 0.50 CASING P RUNPRD PUMU BAKER CEMENTING HEAD WITH SINGLE JOINT OF DP. TAG BOTTOM AT 14,287'DPMD. RIG UP CEMENTING LINES ON RIG FLOOR. 18:15 - 22:15 4.00 CEMT P RUNPRD CIRCULATE AT 5.0-BPM AT 1350-PSI. -PUW= 174K,SOW=124K. -RECIPROCATE PIPE WHILE CIRCULATING. -MIX 70-BBL. PERF PILL. -L/D TOP JT. DP. PU 12'PUP JT.TO GET BAKER CEMENTING HEAD CLOSER TO RIG FLOOR. -PJSM ALL CREWS. REVIEWED PLAN FORWARD AND PUMPING SCHEDULE. Printed 1/17/2011 11:00:39AM North America -ALASKA- BP Page 2 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr (ft) 22:30 - 00:00 1.50 CEMT P RUNPRD PERFORM 4.5"LINER CEMENT JOB: !1 " -PUMP 25 BBLS 11.5-PPG MUDPUSH II AT 3.0-BPM AT 668-PSI TO 1100-PSI. G1°" -P/T LINES TO 800-PSI L0/4800-PSI HI. SoQ -PUMP 98 BBLS 15.8 PPG CLASS G CEMENT AT 5.0-BPM AT 1100-PSI. -DROP DRILL PIPE WIPER DART. -KICK OUT PLUG WITH 70 BBL PERF PILL FOLLOWED BY 8.5-PPG FLO-PRO SF MUD. -DISPLACE WITH RIG PUMPS AT 8.0-BPM. -CAUGHT CEMENT AT 46-BBLS.AWAY. -OBSERVE 2200-PSI PRESSURE SPIKE ON WIPER DART LATCH UP AT 105-BBLS.AWAY. -BUMP PLUG AT 162-BBLS. DISPLACEMENT PUMPED. -PRESSURE UP TO 3000-PSI TO SET LINER HANGER. CONFIRM LINER HANGER SET WITH 40K DOWNWEIGHT. -PRESSURED UP TO 4800-PSI TO SET LINER TOP PACKER. -RELEASE LINER RUNNING TOOL. -BLEED PRESSURE OFF,CHECK FLOATS- FLOATS HOLDING. CEMENT IN PLACE-23:45 11/28/2010. -98 BBLS. 15.8PPG CLASS G CEMENT PUMPED. -YIELD=1.17 FT3/SK. FLOAT SHOE AT 14,289"MD FLOAT COLLAR AT 14,245'MD LANDING COLLAR AT 14,202"MD TOP OF LINER AT 10,366'MD 11/29/2010 00:00 - 00:30 0.50 CEMT P RUNPRD PJSM-RIG DOWN CEMENTING EQUIPMENT. -BLEW DOWN CEMENTING LINES AND DISCONNECTED SAME. 00:30 - 01:00 0.50 CEMT P RUNPRD PRESSURED UP TO 1000-PSI AND PULLED LINER RUNNING TOOL OUT OF LINER TOP. -CIRCULATED OUT EXCESS CEMENT AT 518-GPM AT 2050-PSI. -RECOVERED 180-BBLS.CEMENT CONTAMINATED MUD. 01:00 - 03:30 2.50 CEMT P RUNPRD BREAK OUT AND LAY DOWN BAKER CEMENTING HEAD+2 JTS. DP AND 12'DP PUP JT. -CLEAR AND CLEAN RIG FLOOR. -CLEAN PITS AND TAKE ON SEAWATER. 03:30 - 05:00 1.50 CEMT P -_ RUNPRD DISPLACE WELL TO 8.5-PPG SEAWATER AT 300-GPM AT 900-PSI. 05:00 - 06:00 1.00 CEMT P RUNPRD MONITOR WELL-STATIC. BLOW DOWN TOP DRIVE. INSTALL AIR SLIPS. 06:00 - 09:00 3.00 CEMT P RUNPRD LAY DOWN 120 JTS OF 4"DRILL PIPE. 09:00 - 10:00 1.00 CEMT P RUNPRD PULL OUT OF HOLE RACKING BACK STANDS IN DERRICK FROM 6586'MD TO 4,235'MD. SIMOPS:LOAD PIPE SHED WITH PERFORATION GUNS Printed 1/17/2011 11:00:39AM North America -ALASKA- BP i Page 3 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 10:30 0.50 CEMT P RUNPRD HOLD SAFETY STAND DOWN MEETING WITH RIG LEADERSHIP TEAM,MORNING RIG CREW,AND SERVICE COMPANY REPS. -DISCUSS RECENT DROPPED OBJECTS 10:30 - 12:30 2.00 CEMT P RUNPRD PULL OUT OF HOLE RACKING BACK STANDS IN DERRICK FROM 4,235'MD TO LINER RUNNING TOOL. HELD KICK WHILE TRIPPING DRILL(D1) 12:30 - 13:30 1.00 CEMT P RUNPRD PERFORM SERVICE BREAKS ON LINER RUNNING TOOL. OBSERVE RESIDUAL CEMENT SHEATH ON LINER RUNNING TOOL. LAY DOWN SAME. 13:30 - 14:00 0.50 PERFOB P OTHCMP HOLD SAFETY STAND DOWN MEETING WITH RIG LEADERSHIP TEAM,AFTERNOON RIG CREW,AND SERVICE COMPANY REPS. -DISCUSS RECENT DROPPED OBJECTS 14:00 - 14:45 0.75 PERFOB P OTHCMP RIG UP AND PRESSURE TEST 4.5"LINER. PRESSURE TEST CASING TO 3500 PSI FOR 30 CHARTED MINUTES. -20 PSI LOST IN FIRST 15 MINUTES -0 PSI LOST IN SECOND 15 MINUTES -TOTAL OF 20 PSI LOST IN 30 MINUTES 14:45 - 16:00 1.25 PERFOB P OTHCMP -MOBILIZE TOOLS AND EQUIPMENT TO RIG FLOOR FOR PERFORATION RUN. RIG UP TO RUN PERFORATION GUNS AND 2-7/8"FOX TUBING. 16:00 - 17:00 1.00 PERFOB P OTHCMP CUT AND SLIP 70'OF DRILLING LINE. SERVICE RIG AND TOP DRIVE. 17:00 - 18:00 1.00 PERFOB P OTHCMP CONTINUE TO RIG UP TO RUN PERFORATION GUNS AND 2-7/8"FOX TUBING. 18:00 - 20:00 2.00 PERFOB P OTHCMP HOLD PJSM ON HANDLING PERFORATION GUNS.PICKUP AND RUN IN HOLE WITH 33 PERFORATION GUNS. CHANGE OUT HANDLING TOOLS TO 20:00 - 21:30 1.50 PERFOB N SFAL 1,052.00 OTHCMP TORQUE TURN EQUIPMENT DUMP VALVE FAILED.REPLACE DUMP VALVE WITH SPARE DUMP VALVE.BACKUP DUMP VALVE UNABLE TO TEST. WAIT ON NEW DUMP VALVES TO ARRIVE. 21:30 - 00:00 2.50 PERFOB P OTHCMP RUN IN HOLE WITH PERFORATION ASSEMBLY ON 2-7/8"FOX TUBING. -TORQUE TURN EACH JOINT TO 1800 FT/LBS 11/30/2010 00:00 - 02:30 2.50 PERFOB P OTHCMP RUN IN HOLE WITH PERFORATION ASSEMBLY ON 2-7/8"FOX TUBING. -TORQUE TURN EACH JOINT TO 1800 FT/LBS 02:30 - 03:00 0.50 PERFOB P OTHCMP SERVICE TOP DRIVE AND DRAW WORKS. WORK ON LEAKING HYDRAULIC HOSE ON THE PIPE SKATE. 03:00 - 03:30 0.50 PERFOB P OTHCMP RIG DOWN 2-7/8"RUNNING EQUIPMENT.RIG UP 4"HANDLING EQUIPMENT. 03:30 - 09:30 6.00 PERFOB P OTHCMP RUN IN HOLE WITH PERFORATION GUNS ON 4"DP STANDS TO LANDING COLLAR.TAG UP AT 14,200'MD. -185K PUW,126K SOW 09:30 - 10:00 0.50 PERFOB P OTHCMP PULL OUT OF THE HOLE TO 13760'TO PLACE TING ON DEPTH. -TOP SHOT AT 12,750'MD -BOTTOM SHOT AT 13,760'M Printed 1/17/2011 11:00:39AM North America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 11:00 1.00 PERFOB P OTHCMP ESTABLISH CIRCULATION.CLOSE ANNULUAR BAG. COMMENCE PERFORATION FIRING PROCEDURE BY PRESSURING UP AND BLEEDING OFF.REPEAT CYCLES TO FIRE GUNS. POSITIVE VERIFICATION OF THE GUNS FIRING ON THE SURFACE. LOSSES OF 6 BPH. 11:00 - 12:00 1.00 PERFOB P OTHCMP PULL OUT OF THE HOLE FROM 13760'UNTIL 2 STANDS ABOVE TOP PERF AT 12576' -LOSSES OF 8 BBLS 12:00 - 12:15 0.25 PERFOB P OTHCMP FLOW CHECK THE WELL ON THE TRIP TANK. LOSSES AT 2 BPH. RIG UP TO LAY DOWN 4" DRILLPIPE. 12:15 - 16:00 3.75 PERFOB P OTHCMP PULL OUT OF THE HOLE LAYING DOWN 4" DRILL PIPE. 16:00 - 16:45 0.75 PERFOB P OTHCMP RUN IN THE HOLE WITH 18 STANDS OF 4" DRILL PIPE FROM THE DERRICK. 16:45 - 20:30 3.75 PERFOB P OTHCMP PULL OUT OF THE HOLE LAYING DOWN 4" DRILL PIPE TO 3924'. MORGAN CREW:KICK WHILE TRIPPING DRILL,CRT 1 MIN 25 SEC 20:30 - 00:00 3.50 PERFOB P OTHCMP RIG UP 2-7/8"HANDLING TOOLS AND LAY DOWN 93 JOINTS OF FOX TUBING. 12/1/2010 00:00 - 03:15 3.25 PERFOB P OTHCMP PULL OUT OF THE HOLE LAYING DOWN THE PERFORATING GUNS. ALL PERFORATING GUNS WERE FIRED. 03:15 - 04:00 0.75 RUNCOM P RUNCMP CLEAN AND CLEAR THE RIG FLOOR 04:00 - 04:30 0.50 WHSUR P RUNCMP PULL THE WEAR BUSHING. 04:30 - 05:00 0.50 RUNCOM P RUNCMP PERFORM A DUMMY RUN WITH THE TUBING HANGER. 05:00 - 06:00 1.00 RUNCOM P RUNCMP RIG UP TO RUN 4.5"COMPLETION AND MAKE UP SAFETY VALVE Printed 1/17/2011 11:00.39AM North America -ALASKA- BP Page 5 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project: Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum: J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 21:30 15.50 RUNCOM P RUNCMP MAKE UP 4.5"COMPLETION AND RUN AS FOLLOWS: 4.5"WLEG TC-II BOX 4.90"OD 13CR 4.5", 12.6#,13 CR-80 TC-II PUP JOINT 4.5"HES'XN'NIPPLE 9 CR W/RHC-M 3.725" NO-GO 4.5", 12.6#,13 CR-80 TC-II PUP JOINT 4.5", 12.6#,13 CR-80 VAM TOP BOX X TC-II PIN XO PUP A JT 4.5"12.6#13 CR-80 VAM TOP TBG W/BAKERLOCKED COUPLING 4.5", 12.6#,13 CR-80 TC-II BOX TO VAM TOP PIN XO PUP 4.5"'X'NIPPLE 9 CR 3.813"ID PKG BORE TC-II 4.5", 12.6#,13 CR VAM TOP BOX TOTC II PIN XO PUP 4.5", 12.6#,13 CR-80 VAM TOP BOX X PIN PUP 7"X 4.5"12.6#13CR HES TNT PACKER TC-II BOX X PIN 4.5", 12.6#,13 CR-80 VAM TOP BOX X PIN PUP 4.5", 12.6#,13 CR-80 TC-II BOX TO VAM TOP PIN XO PUP 4.5" 'X'NIPPLE:9 CR 3.813"ID PKG BORE TC-II 4.5", 12.6#,13 CR-80 VAM TOP BOX X TC-II PIN XO PUP 2 JTS 4.5", 12.6#,13 CR-85 VAM TOP TUBING (#1-2) 4.5", 12.6#,13 CR-80 TC-II BOX X VAM TOP PIN XO PUP #1 GLM 4.5"X 1"12.6#9CR KBG-2 DV W/ SBK-2C LATCH 4.5", 12.6#,13 CR-80 VAM TOP BOX X TC-II PIN XO PUP 60 JTS 4.5", 12.6#,13 CR-85 VAM TOP TUBING (#3-62) 4.5", 12.6#,13 CR-80 TC-II BOX X VAM TOP PIN XO PUP #2 GLM 4.5"X 1"12.6#9CR KBG-2 DV W/ SBK-2C LATCH 4.5", 12.6#,13 CR-80 VAM TOP BOX X TC-II PIN XO PUP 72 JTS 4.5", 12.6#,13 CR-85 VAM TOP TUBING (#63-134) 4.5", 12.6#,13 CR-80 TC-II BOX TO VAM TOP PIN XO PUP #3 GLM 4.5"X 1"KBG-2 W/DCK-2 SHEAR VALVE W/BEK-LATCH 4.5", 12.6#,13 CR-80 VAM TOP BOX TO TC-II PIN XO PUP 57 JTS 4.5", 12.6#,13 CR-85 VAM TOP TUBING (#135-191) 4.5", 12.6#,13 CR-80 TC-II BOX TO VAM TOP PIN XO PUP JOINT 4.5" 'X'NIPPLE 9CR 3.813"ID PKG BORE 4.5", 12.6#,13 CR-80 VAM TOP BOX TO TC-Il PIN XO PUP 50 JTS 4.5", 12.6#,13 CR-85 VAM TOP TUBING (#192-241) KRUGER CREW: UNANNOUNCED KICK WHILE TRIPPING DRILL,CRT 2 MIN Printed 1/17/2011 11:00:39AM • North America -ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name:J-20 AFE No Event Type:COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project:Prudhoe Bay Site: PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual©68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 RUNCOM P RUNCMP TAG UP WITH JT.244 ON THE 4.5"LINER TOP 7.5'HIGH,SAW POSITIVE INDICATION BY TAKING 5K WT DOWN. ROTATED 1/4 TURN. WENT IN AN ADDITIONAL 11'AND TAGGED UP ON THE BOTTOM OF THE TIE BACK RECEPTACLE. PICKED UP AND LAID DOWN JT.244,243,AND 242. PICKED UP AND MAKE UP PUP JTS.(2.08',5.84',9.82',9.84)ALONG WITH JT 242 AND TUBING HANGER PUP AND TUBING HANGER. 12/2/2010 00:00 - 00:30 0.50 RUNCOM P RUNCMP LAND THE 4.5"COMPLETION AND RUN IN THE LOCK DOWN SCREWS. -UP WT. 145K/DOWN WT. 105K 00:30 - 01:00 0.50 RUNCOM P RUNCMP RIG UP TO REVERSE CIRCULATE IN THE CORROSION INHIBITOR. 01:00 - 03:30 2.50 RUNCOM P RUNCMP REVERSE CIRCULATE 158 BBLS OF 8.5 PPG CLEAN SEAWATER AT 4 BPM WITH 350 PSI, FOLLOWED BY 107 BBLS OF CORROSION INHIBITED 8.5 PPG SEAWATER AT 4 BPM WITH 340 PSI. REVERSE CIRCULATE AN ADDITIONAL 200 BBLS OF 8.5 PPG SEAWATER AT 4 BPM WITH 350 PSI. 03:30 - 04:00 0.50 RUNCOM P RUNCMP MONITOR THE WELL AND RIG UP TO PUMP 10 BBLS DOWN THE TUBING. 04:00 - 06:30 2.50 RUNCOM P RUNCMP DROP THE BALL AND ROD. PRESSURE UP TO 250 PSI(25 BBL)AND HOLD FOR 5 MINUTES. PRESSURE UP TO 3500 PSI (2BBLS)AND HOLD FOR 30 MINUTES. SAW 100 PSI DROP IN FIRST 15 MINUTES AND 10 PSI DROP IN SECOND 15 MINUTES. GOOD TEST. BLEED PRESSURE DOWN TO 1500 PSI IN TUBING. ESSURE UP THE ANNULUS TO _ 250 PSI(1 BBL)AND HOLD 5 MINUTFS PRESSURE UP TO 3500 PSI(4BBLS)AND HOLD FOR 30 MINUTES. LOST 25 PSI IN FIRST 15 MINUTES AND 0 PSI IN SECOND 15 MINUTES. ALL TESTS CHARTED. RECOVERED ALL FLUID USED TO PRESSURE UP BACK WHEN PRESSURE WAS BLED OFF. PRESSURE UP ON THE ANNULUS TO SHEAR THE DCK-2 VALVE AT 3300 PSI. PUMP 3 BBLS _BOTH DIRECTIONS TO VERIFY SHEAR. 06:30 - 08:00 1.50 RUNCOM P RUNCMP SET THE TWC AND TEST FROM BELOW TO 2000 PSI FOR 10 MINUTES AND 3500 PSI FROM ABOVE FOR 10 MINUTES. BOTH TESTS CHARTED. 08:00 - 09:30 1.50 RUNCOM P RUNCMP BLOW DOWN AND RIG DOWN ALL TESTING EQUIPMENT. 09:30 - 12:00 2.50 BOPSUR P WHDTRE NIPPLE DOWN THE BOP STACK AND ADAPTOR SPOOL. 12:00 - 13:00 1.00 BOPSUR P WHDTRE SAFETY STAND DOWN WITH ALAN MADSEN, LOWELL CRANE, RICHARD BORDES AND RIG • CREW ABOUT RECENT EVENTS ON DOYON 141. 13:00 - 20:00 7.00 BOPSUR P WHDTRE NIPPLE UP ADAPTOR FLANGE TO WELL HEAD AND PRODUCTION TREE,FILL WITH DIESEL AND TEST TO 250 PSI LOW AND 5000 PSI HIGH FOR 5 MINUTES EACH,CHARTED TESTS. Printed 1/17/2011 11:00:39AM North America -ALASKA- BP Page 7 of 7 Operation Summary Report Common Wet Name:J-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/24/2010 End Date: 12/3/2010 X3-00XCG-C(1,912,330.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.: DOYON 141 Spud Date/Time:8/1/1996 12:00:00AM Rig Release: 12/3/2010 Rig Contractor: DOYON DRILLING INC. UWI:500292171600 Active Datum:J-20C Actual @68.67ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 21:30 1.50 WHSUR P WHDTRE RIG UP AND TEST DSM LUBRICATOR TO 350 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES. PULL TWC AND RIG DOWN LUBRICATOR. 21:30 - 00:00 2.50 WHSUR P WHDTRE RIG UP LRS AND TEST LINES. PUMP 138 BBLS OF 80 DEGREE DIESEL AT 1.5 BPM WITH 600 PSI. 12/3/2010 00:00 - 01:00 1.00 WHSUR P WHDTRE FINISH PUMPING 138 BBLS OF 80 DEGREE DIESEL AT 1.5 BPM WITH 600 PSI. 01:00 - 02:00 1.00 WHSUR P WHDTRE ALLOW TO FREEZE PROTECT TO U-TUBE. 02:00 - 02:30 0.50 WHSUR P WHDTRE RIG UP AND SET THE BPV 02:30 - 04:00 1.50 WHSUR P WHDTRE RIG UP AND TEST THE BPV FROM BELOW TO 2000 PSI FOR 10 MINUTES CHARTED. RIG DOWN LRS. 04:00 - 06:00 2.00 WHSUR P WHDTRE SECURE THE WELL AND RELEASE THE RIG AT 06:00. Printed 1/17/2011 11:00:39AM J-20C, Well History Date Summary 12/03/10 T/I/O=0/0/0 Pulled 4" CIW H TWC w/1-2'ext. @ 102" post tree test. Pressure tested lubricator to 300 psi low and 3500 psi high. (passed) Doyon 141. 12/12/10 T/1/O=0/0/0 Verified barriers, attached lubricator pressure tested : Low 300 psi/Pass- High 3500 psi /Pass . Pulled 4-1/16" CIW "H" BPV thru tree, 1-1'ext. used ...tag @ 115"..removed lubricator, pressure tested tree cap to 500 psi/Pass Post Doyon 141...no problems. 01/05/11 ***WELL S/I ON ARRIVAL***(post ctd) PULL BALL& ROD FROM 4-1/2" RHC @ 10,336' SLM. PULL BK-DGLV FROM ST#2 @ 7,573'SLM/7,594' MD. PULL BEK-DCK FROM ST#3 @ 4,556' SLM/4,580' MD. SET ST#3 BK-LGLV(16/64", #1500) @ 4,580' MD. SET ST#2 BK-OGLV(5/16" ports) @ 7,594' MD. PULL 4-1/2" RHC PLUG BODY AT 10,336' SLM/10,361' MD. ***WELL LEFT S/I, DSO NOTIFIED*** 01/07/11 ASRC Test Unit#2,Transport equipment to location, Begin rig up, ***Job in Progress*** ***Inlet J-20, Outlet J-09*** 01/08/11 ASRC Test Unit#2,Complete Rig up, Stand-by for Field Shut down, ***Job in Progress*** ***Inlet J-20,Outlet J-09*** Page 1 of 1 North America - ALASKA - BP Prudhoe Bay PB J Pad J-20 500292171600 J-20C Design: J-20C Survey Report - Geographic 29 November, 2010 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay ND Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM .16-Anc Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB J Pad,TR-11-13 Site Position: Northing: 5,968,224.22ft Latitude: 70°19'14.845 N From: Map Easting: 641,155.79ft Longitude: 148°51'20.092 W LPosition Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.08 ° Well J-20 API No 500292171600 Well Position +N/-S 0.00 ft Northing: 5,970,139.00 ft Latitude: 70°19'33.226 N +E/-W 0.00 ft Easting: 643,560.00 ft Longitude: 148°50'8.869 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 39.50 ft Wellbore J-20C API No 500292171603 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 11/2/2010 21.90 80.94 57,702 Design J 20C Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 3,145.77 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 29.17 0.00 0.00 147.18 Survey Program Date: 11/29/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 31.17 3,145.77 1 :Schlumberger GCT multishot(J-20) GCT-MS Schlumberger GCT multishot 3,152.00 3,458.74 MWD Run 300 Interpolated Azimuth(J-20C) INC+TREND Inclinometer+known azi trend 3,489.93 14,243.89 MWD Run 300 400 500 600 700 800(J-20C) MWD+IFR+MS MWD+IFR+Multi Station 11/29/2010 4:29:39PM Page 2 COMPASS 2003.16 Build 73 • Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey I Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 29.17 0.00 0.00 29.17 0.00 0.00 5,970,139.00 643,560.00 70°19'33.226 N 148°50'8.869 W 31.17 0.10 181.16 31.17 0.00 0.00 5,970,139.00 643,560.00 70°19'33.226 N 148°50'8.869 W 43.07 0.10 151.33 43.07 -0.02 0.00 5,970,138.98 643,560.01 70°19'33.226 N 148°50'8.869 W 55.07 0.10 129.13 55.07 -0.04 0.02 5,970,138.96 643,560.02 70°19'33.226 N 148°50'8.869 W 67.07 0.10 126.97 67.07 -0.05 0.03 5,970,138.95 643,560.04 70°19'33.226 N 148°50'8.868 W 78.97 0.12 132.19 78.97 -0.06 0.05 5,970,138.94 643,560.05 70°19'33.226 N 148°50'8.868 W 90.97 0.12 139.60 90.97 -0.08 0.07 5,970,138.92 643,560.07 70°19'33.225 N 148°50'8.867 W 102.97 0.13 144.85 102.97 -0.10 0.09 5,970,138.90 643,560.09 70°19'33.225 N 148°50'8.867 W 114.87 0.15 147.01 114.87 -0.13 0.10 5,970,138.87 643,560.10 70°19'33.225 N 148°50'8.866 W 126.87 0.15 149.33 126.87 -0.15 0.12 5,970,138.85 643,560.12 70°19'33.225 N 148°50'8.866 W 138.77 0.17 154.20 138.77 -0.18 0.13 5,970,138.82 643,560.14 70°19'33.224 N 148°50'8.865 W 150.77 0.17 159.68 150.77 -0.22 0.15 5,970,138.79 643,560.15 70°19'33.224 N 148°50'8.865 W 162.67 0.17 162.63 162.67 -0.25 0.16 5,970,138.75 643,560.16 70°19'33.224 N 148°50'8.864 W 174.67 0.17 162.49 174.67 -0.28 0.17 5,970,138.72 643,560.18 70°19'33.223 N 148°50'8.864 W 186.57 0.17 163.89 186.57 -0.32 0.18 5,970,138.69 643,560.19 70°19'33.223 N 148°50'8.864 W 198.57 0.17 167.39 198.57 -0.35 0.19 5,970,138.65 643,560.20 70°19'33.223 N 148°50'8.864 W 210.57 0.15 173.09 210.57 -0.38 0.19 5,970,138.62 643,560.20 70°19'33.222 N 148°50'8.863 W 222.47 0.15 181.43 222.47 -0.42 0.20 5,970,138.59 643,560.20 70°19'33.222 N 148°50'8.863 W 234.47 0.15 191.04 234.47 -0.45 0.19 5,970,138.56 643,560.20 70°19'33.222 N 148°50'8.864 W 246.37 0.13 198.41 246.37 -0.47 0.19 5,970,138.53 643,560.19 70°19'33.222 N 148°50'8.864 W 258.37 0.13 206.62 258.37 -0.50 0.18 5,970,138.50 643,560.18 70°19'33.221 N 148°50'8.864 W 270.37 0.12 216.24 270.37 -0.52 0.16 5,970,138.48 643,560.17 70°19'33.221 N 148°50'8.864 W 282.37 0.10 220.67 282.37 -0.54 0.15 5,970,138.46 643,560.16 70°19'33.221 N 148°50'8.865 W 294.27 0.08 221.68 294.27 -0.55 0.13 5,970,138.45 643,560.15 70°19'33.221 N 148°50'8.865 W 306.27 0.05 215.69 306.27 -0.56 0.13 5,970,138.44 643,560.14 70°19'33.221 N 148°50'8.865 W 318.27 0.03 189.88 318.27 -0.57 0.12 5,970,138.43 643,560.13 70°19'33.221 N 148°50'8.866 W 330.27 0.03 148.16 330.27 -0.58 0.12 5,970,138.42 643,560.13 70°19'33.221 N 148°50'8.866 W 342.17 0.08 121.84 342.17 -0.59 0.13 5,970,138.42 643,560.14 70°19'33.220 N 148°50'8.865 W 354.17 0.13 117.43 354.17 -0.60 0.15 5,970,138.41 643,560.16 70°19'33.220 N 148°50'8.865 W 366.17 0.15 123.16 366.17 -0.61 0.18 5,970,138.39 643,560.19 70°19'33.220 N 148°50'8.864 W 378.07 0.15 134.92 378.07 -0.63 0.20 5,970,138.37 643,560.21 70°19'33.220 N 148°50'8.863 W 390.07 0.13 152.55 390.07 -0.65 0.22 5,970,138.35 643,560.23 70°19'33.220 N 148°50'8.863 W 402.07 0.12 176.35 402.07 -0.68 0.23 5,970,138.33 643,560.24 70°19'33.220 N 148°50'8.863 W 414.07 0.12 193.29 414.07 -0.70 0.22 5,970,138.30 643,560.24 70°19'33.219 N 148°50'8.863 W 425.97 0.10 200.05 425.97 -0.72 0.22 5,970,138.28 643,560.23 70°19'33.219 N 148°50'8.863 W 437.87 0.05 192.78 437.87 -0.74 0.21 5,970,138.26 643,560.23 70°19'33.219 N 148°50'8.863 W 449.57 0.03 155.19 449.57 -0.75 0.21 5,970,138.26 643,560.23 70°19'33.219 N 148°50'8.863 W 461.57 0.08 117.79 461.57 -0.75 0.22 5,970,138.25 643,560.24 70°19'33.219 N 148°50'8.863 W 473.57 0.13 108.75 473.57 -0.76 0.24 5,970,138.24 643,560.26 70°19'33.219 N 148°50'8.862 W 485.47 0.17 112.17 485.47 -0.77 0.27 5,970,138.23 643,560.29 70°19'33.219 N 148°50'8.861 W 497.47 0.17 122.96 497.47 -0.79 0.30 5,970,138.22 643,560.32 70°19'33.218 N 148°50'8.860 W 509.47 0.15 143.51 509.47 -0.81 0.33 5,970,138.19 643,560.34 70°19'33.218 N 148°50'8.860 W 521.47 0.13 173.63 521.47 -0.84 0.34 5,970,138.17 643,560.35 70°19'33.218 N 148°50'8.859 W 533.47 0.12 197.41 533.47 -0.86 0.33 5,970,138.14 643,560.35 70°19'33.218 N 148°50'8.859 W 545.47 0.08 207.50 545.47 -0.88 0.33 5,970,138.12 643,560.34 70°19'33.218 N 148°50'8.860 W 557.47 0.03 192.80 557.47 -0.89 0.32 5,970,138.11 643,560.34 70°19'33.217 N 148°50'8.860 W 569.47 0.03 . 139.68 569.47 -0.90 0.32 5,970,138.11 643,560.34 70°19'33.217 N 148°50'8.860 W 581.57 0.12 105.03 581.57 -0.90 0.34 5,970,138.10 643,560.36 70°19'33.217 N 148°50'8.859 W 593.57 0.20 107.74 593.57 -0.91 0.37 5,970,138.09 643,560.39 70°19'33.217 N 148°50'8.858 W 605.57 0.23 111.36 605.57 -0.93 0.41 5,970,138.08 643,560.43 70°19'33.217 N 148°50'8.857 W 617.57 0.22 118.75 617.57 -0.95 0.46 5,970,138.06 643,560.47 70°19'33.217 N 148°50'8.856 W 629.57 0.20 128.72 629.57 -0.97 0.49 5,970,138.04 643,560.51 70°19'33.217 N 148°50'8.855 W 641.57 0.18 147.33 641.57 -1.00 0.52 5,970,138.01 643,560.54 70°19'33.216 N 148°50'8.854 W 653.67 0.22 160.78 653.67 -1.04 0.54 5,970,137.97 643,560.56 70°19'33.216 N 148°50'8.853 W 665.67 0.27 162.96 665.67 -1.09 0.55 5,970,137.92 643,560.57 70°19'33.216 N 148°50'8.853 W 11/29/2010 4.29:39PM Page 3 COMPASS 2003.16 Build 73 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 677.67 0.25 166.87 677.67 -1.14 0.57 5,970,137.87 643,560.59 70° 19'33.215 N 148°50'8.853 W 689.67 0.22 163.52 689.67 -1.19 0.58 5,970,137.82 643,560.60 70°19'33.215 N 148°50'8.852 W 701.67 0.23 148.66 701.67 -1.23 0.60 5,970,137.78 643,560.62 70°19'33.214 N 148°50'8.852 W 713.67 0.35 132.37 713.67 -1.28 0.64 5,970,137.74 643,560.66 70°19'33.214 N 148°50'8.851 W 725.67 0.58 128.97 725.67 -1.34 0.71 5,970,137.67 643,560.74 70°19'33.213 N 148°50'8.848 W 737.77 0.87 132.37 737.77 -1.44 0.83 5,970,137.58 643,560.85 70°19'33.212 N 148°50'8.845 W 749.77 1.22 131.35 749.76 -1.59 0.99 5,970,137.43 643,561.02 70°19'33.211 N 148°50'8.840 W 761.77 1.65 129.22 761.76 -1.78 1.22 5,970,137.24 643,561.25 70°19'33.209 N 148°50'8.834 W 773.77 2.15 127.42 773.75 -2.03 1.53 5,970,137.00 643,561.57 70°19'33.206 N 148°50'8.824 W 785.67 2.72 126.46 785.64 -2.33 1.94 5,970,136.71 643,561.98 70°19'33.203 N 148°50'8.813 W 797.57 3.25 125.26 797.53 -2.69 2.44 5,970,136.36 643,562.49 70°19'33.200 N 148°50'8.798 W 809.37 3.77 124.04 809.30 -3.10 3.03 5,970,135.96 643,563.09 70°19'33.196 N 148°50'8.781 W 821.17 4.28 123.65 821.08 -3.56 3.72 5,970,135.51 643,563.79 70°19'33.191 N 148°50'8.760 W 832.97 4.77 123.35 832.84 -4.08 4.50 5,970,135.01 643,564.58 70°19'33.186 N 148°50'8.738 W 844.87 5.15 123.05 844.69 -4.64 5.36 5,970,134.46 643,565.45 70°19'33.181 N 148°50'8.713 W 856.77 5.50 122.95 856.54 -5.24 6.29 5,970,133.88 643,566.38 70°19'33.175 N 148°50'8.686 W 868.57 5.85 122.89 868.28 -5.88 7.27 5,970,133.26 643,567.38 70°19'33.168 N 148°50'8.657 W 880.47 6.23 122.58 880.12 -6.55 8.32 5,970,132.61 643,568.44 70°19'33.162 N 148°50'8.626 W 892.37 6.67 122.10 891.94 -7.27 9.45 5,970,131.91 643,569.59 70°19'33.155 N 148°50'8.593 W 904.17 7.02 121.59 903.66 -8.01 10.64 5,970,131.20 643,570.79 70°19'33.147 N 148°50'8.558 W 916.07 7.17 121.17 915.47 -8.78 11.90 5,970,130.45 643,572.06 70°19'33.140 N 148°50'8.522 W 927.97 7.27 120.77 927.27 -9.54 13.18 5,970,129.71 643,573.36 70°19'33.132 N 148°50'8.484 W 939.77 7.42 120.43 938.98 -10.31 14.48 5,970,128.97 643,574.67 70°19'33.125 N 148°50'8.446 W 951.67 7.55 120.07 950.78 -11.09 15.82 5,970,128.21 643,576.03 70°19'33.117 N 148°50'8.407 W 963.57 7.70 119.48 962.57 -11.88 17.19 5,970,127.45 643,577.41 70°19'33.109 N 148°50'8.367 W 975.47 7.93 118.92 974.36 -12.67 18.60 5,970,126.69 643,578.84 70°19'33.102 N 148°50'8.326 W 987.37 8.13 118.40 986.14 -13.46 20.06 5,970,125.92 643,580.31 70°19'33.094 N 148°50'8.284 W 999.17 8.28 117.90 997.82 -14.26 21.54 5,970,125.16 643,581.81 70°19'33.086 N 148°50'8.240 W 1,011.07 8.45 117.59 1,009.60 -15.06 23.08 5,970,124.38 643,583.36 70°19'33.078 N 148°50'8.196 W 1,022.97 8.57 117.39 1,021.36 -15.88 24.64 5,970,123.60 643,584.94 70°19'33.070 N 148°50'8.150 W 1,034.87 8.70 117.28 1,033.13 -16.70 26.23 5,970,122.81 643,586.54 70°19'33.062 N 148°50'8.104 W 1,046.77 8.87 117.31 1,044.89 -17.53 27.84 5,970,122.01 643,588.17 70°19'33.054 N 148°50'8.056 W 1,058.67 9.05 117.51 1,056.65 -18.38 29.49 5,970,121.18 643,589.83 70°19'33.045 N 148°50'8.008 W 1,070.57 9.27 117.69 1,068.39 -19.26 31.17 5,970,120.34 643,591.53 70°19'33.037 N 148°50'7.959 W 1,082.37 9.48 117.70 1,080.04 -20.16 32.87 5,970,119.48 643,593.24 70°19'33.028 N 148°50'7.910 W 1,094.37 9.68 117.64 1,091.87 -21.08 34.64 5,970,118.59 643,595.03 70°19'33.019 N 148°50'7.858 W 1,106.27 9.83 117.50 1,103.60 -22.02 36.42 5,970,117.69 643,596.84 70°19'33.010 N 148°50'7.806 W 1,118.17 10.07 117.41 1,115.32 -22.96 38.25 5,970,116.77 643,598.68 70°19'33.000 N 148°50'7.753 W 1,130.07 10.38 117.40 1,127.03 -23.94 40.12 5,970,115.84 643,600.57 70°19'32.991 N 148°50'7.698 W 1,141.97 10.65 117.32 1,138.73 -24.93 42.05 5,970,114.88 643,602.52 70°19'32.981 N 148°50'7.642 W 1,153.87 10.78 117.12 1,150.42 -25.95 44.02 5,970,113.90 643,604.50 70°19'32.971 N 148°50'7.584 W 1,165.77 10.93 116.91 1,162.11 -26.96 46.02 5,970,112.92 643,606.52 70°19'32.961 N 148°50'7.526 W 1,177.67 11.10 116.79 1,173.79 -27.99 48.04 5,970,111.94 643,608.57 70°19'32.951 N 148°50'7.467 W 1,189.57 11.18 116.81 1,185.46 -29.03 50.10 5,970,110.94 643,610.64 70°19'32.941 N 148°50'7.407 W 1,201.47 11.27 116.82 1,197.14 -30.07 52.16 5,970,109.93 643,612.73 70°19'32.930 N 148°50'7.346 W 1,213.47 11.37 116.84 1,208.90 -31.14 54.27 5,970,108.91 643,614.85 70°19'32.920 N 148°50'7.285 W 1,225.37 11.45 117.09 1,220.57 -32.20 56.36 5,970,107.88 643,616.97 70°19'32.910 N 148°50'7.224 W 1,237.27 11.48 117.31 1,232.23 -33.28 58.47 5,970,106.84 643,619.09 70°19'32.899 N 148°50'7.162 W 1,249.17 11.52 117.49 1,243.89 -34.38 60.57 5,970,105.79 643,621.22 70°19'32.888 N 148°50'7.101 W 1,261.07 11.62 117.80 1,255.55 -35.48 62.69 5,970,104.72 643,623.35 70°19'32.877 N 148°50'7.039 W 1,273.07 11.78 118.22 1,267.30 -36.63 64.84 5,970,103.62 643,625.52 70°19'32.866 N 148°50'6.977 W 1,284.97 12.02 118.97 1,278.95 -37.80 66.99 5,970,102.49 643,627.70 70°19'32.854 N 148°50'6.914 W 1,296.87 12.25 119.94 1,290.58 -39.03 69.17 5,970,101.30 643,629.90 70°19'32.842 N 148°50'6.850 W 1,308.77 12.45 120.68 1,302.20 -40.32 71.37 5,970,100.06 643,632.12 70°19'32.830 N 148°50'6.786 W 1,320.67 12.72 121.16 1,313.82 -41.65 73.59 5,970,098.77 643,634.37 70°19'32.817 N 148°50'6.721 W ■ 11/29/2010 4:29:39PM Page 4 COMPASS 2003.16 Build 73 • Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 1,332.57 13.10 121.55 1,325.42 -43.03 75.86 5,970,097.43 643,636.66 70° 19'32.803 N 148°50'6.655 W 1,344.57 13.60 121.87 1,337.09 -44.49 78.22 5,970,096.02 643,639.05 70°19'32.789 N 148°50'6.586 W 1,356.37 14.20 121.97 1,348.55 -45.99 80.62 5,970,094.57 643,641.48 70°19'32.774 N 148°50'6.516 W 1,368.27 14.88 121.69 1,360.07 -47.56 83.16 5,970,093.04 643,644.05 70°19'32.758 N 148°50'6.442 W 1,380.17 15.48 121.06 1,371.55 -49.18 85.82 5,970,091.47 643,646.74 70°19'32.743 N 148°50'6.364 W 1,392.07 15.92 120.32 1,383.01 -50.83 88.59 5,970,089.88 643,649.54 70°19'32.726 N 148°50'6.283 W 1,403.97 16.32 119.61 1,394.44 -52.48 91.45 5,970,088.29 643,652.44 70°19'32.710 N 148°50'6.200 W 1,415.87 16.72 118.94 1,405.85 -54.13 94.41 5,970,086.69 643,655.42 70°19'32.694 N 148°50'6.113 W 1,427.67 17.05 118.33 1,417.14 -55.77 97.41 5,970,085.10 643,658.46 70°19'32.678 N 148°50'6.026 W 1,439.57 17.32 117.76 1,428.51 -57.43 100.52 5,970,083.51 643,661.59 70°19'32.661 N 148°50'5.935 W 1,451.47 17.55 117.32 1,439.86 -59.08 103.68 5,970,081.92 643,664.78 70°19'32.645 N 148°50'5.843 W 1,463.37 17.67 117.08 1,451.20 -60.72 106.88 5,970,080.34 643,668.02 70°19'32.629 N 148°50'5.749 W 1,475.37 17.73 117.03 1,462.64 -62.38 110.13 5,970,078.74 643,671.30 70°19'32.613 N 148°50'5.654 W 1,487.27 17.80 117.00 1,473.97 -64.03 113.37 5,970,077.15 643,674.56 70°19'32.596 N 148°50'5.560 W 1,499.17 17.88 117.13 1,485.30 -65.69 116.61 5,970,075.56 643,677.84 70°19'32.580 N 148°50'5.465 W 1,511.07 18.07 117.34 1,496.61 -67.37 119.88 5,970,073.94 643,681.13 70°19'32.564 N 148°50'5.370 W 1,522.97 1,534.87 18.30 117.43 1,507.92 -69.08 123.17 5,970,072.30 643,684.46 70°19'32.547 N 148°50'5.274 W 18.52 117.49 1,519.21 -70.81 126.51 5,970,070.63 643,687.83 70°19'32.530 N 148°50'5.176 W 1,546.77 18.67 117.39 1,530.49 -72.56 129.88 5,970,068.94 643,691.23 70°19'32.513 N 148°50'5.078 W 1,558.77 18.78 117.27 1,541.85 -74.33 133.30 5,970,067.24 643,694.69 70°19'32.495 N 148°50'4.978 W 1,570.67 18.92 117.26 1,553.12 -76.09 136.72 5,970,065.55 643,698.14 70°19'32.478 N 148°50'4.878 W 1,582.57 19.02 117.29 1,564.37 -77.86 140.16 5,970,063.84 643,701.61 70°19'32.460 N 148°50'4.778 W 1,594.47 19.15 117.33 1,575.62 -79.65 143.61 5,970,062.12 643,705.10 70°19'32.443 N 148°50'4.677 W 1,606.47 19.32 117.37 1,586.95 -81.46 147.12 5,970,060.37 643,708.64 70°19'32.425 N 148°50'4.575 W 1,618.37 19.43 117.40 1,598.17 -83.28 150.63 5,970,058.62 643,712.18 70°19'32.407 N 148°50'4.472 W 1,630.17 19.53 117.44 1,609.30 -85.09 154.12 5,970,056.88 643,715.71 70°19'32.389 N 148°50'4.370 W 1,641.97 19.62 117.60 1,620.42 -86.92 157.63 5,970,055.12 643,719.25 70°19'32.371 N 148°50'4.268 W 1,653.67 19.68 117.73 1,631.43 -88.75 161.11 5,970,053.36 643,722.77 70°19'32.353 N 148°50'4.166 W 1,665.47 19.82 117.93 1,642.54 -90.61 164.64 5,970,051.57 643,726.33 70°19'32.335 N 148°50'4.063 W 1,677.27 20.00 118.44 1,653.63 -92.51 168.18 5,970,049.74 643,729.91 70°19'32.316 N 148°50'3.960 W 1,689.07 20.08 118.86 1,664.72 -94.44 171.73 5,970,047.87 643,733.49 70°19'32.297 N 148°50'3.856 W 1,700.87 20.15 119.00 1,675.80 -96.41 175.28 5,970,045.97 643,737.08 70°19'32.278 N 148°50'3.753 W 1,712.57 20.27 119.25 1,686.78 -98.37 178.81 5,970,044.07 643,740.65 70°19'32.259 N 148°50'3.650 W 1,724.37 20.42 119.78 1,697.84 -100.40 182.38 5,970,042.12 643,744.26 70°19'32.239 N 148°50'3.545 W 1,736.17 20.58 120.41 1,708.90 -102.47 185.96 5,970,040.12 643,747.87 70°19'32.218 N 148°50'3.441 W 1,747.97 20.78 121.00 1,719.94 -104.60 189.54 5,970,038.06 643,751.49 70°19'32.198 N 148°50'3.337 W • 1,759.77 21.00 121.65 1,730.96 -106.78 193.13 5,970,035.94 643,755.13 70°19'32.176 N 148°50'3.232 W 1,771.57 21.18 122.30 1,741.97 -109.03 196.74 5,970,033.76 643,758.77 70°19'32.154 N 148°50'3.127 W 1,783.37 21.27 122.65 1,752.97 -111.33 200.34 5,970,031.54 643,762.42 70°19'32.131 N 148°50'3.021 W 1,795.17 21.35 122.83 1,763.96 -113.64 203.95 5,970,029.29 643,766.07 70°19'32.109 N 148°50'2.916 W 1,806.97 21.47 123.04 1,774.95 -115.99 207.56 5,970,027.01 643,769.73 70°19'32.085 N 148°50'2.811 W 1,818.77 21.60 123.20 1,785.92 -118.35 211.19 5,970,024.72 643,773.40 70°19'32.062 N 148°50'2.705 W 1,830.57 21.80 123.36 1,796.89 -120.75 214.84 5,970,022.39 643,777.09 70°19'32.039 N 148°50'2.598 W 1,842.37 21.98 123.57 1,807.84 -123.17 218.51 5,970,020.04 643,780.81 70°19'32.015 N 148°50'2.491 W pI 1,854.17 22.13 123.70 1,818.77 -125.63 222.20 5,970,017.66 643,784.54 70°19'31.991 N 148°50'2.383 W 1,866.07 22.28 123.78 1,829.79 -128.13 225.94 5,970,015.23 643,788.33 70°19'31.966 N 148°50'2.274 W 1,877.87 22.50 123.88 1,840.70 -130.63 229.67 5,970,012.80 643,792.11 70°19'31.941 N 148°50'2.165 W 1,889.67 22.72 123.94 1,851.60 -133.16 233.43 5,970,010.34 643,795.92 70°19'31.917 N 148°50'2.055 W 1,901.47 22.92 123.93 1,862.47 -135.71 237.23 5,970,007.86 643,799.77 70°19'31.891 N 148°50'1.945 W 1,913.27 23.28 123.99 1,873.33 -138.30 241.07 5,970,005.35 643,803.65 70°19'31.866 N 148°50'1.832 W 1,925.17 23.68 124.11 1,884.24 -140.95 245.00 5,970,002.77 643,807.63 70°19'31.840 N 148°50'1.718 W 1,936.97 23.92 124.14 1,895.04 -143.63 248.94 5,970,000.17 643,811.63 70°19'31.814 N 148°50'1.603 W 1,948.77 24.17 124.08 1,905.81 -146.32 252.92 5,969,997.55 643,815.66 70°19'31.787 N 148°50'1.487 W 1,960.57 24.48 124.05 1,916.57 -149.04 256.95 5,969,994.91 643,819.73 70°19'31.760 N 148°50'1.369 W 1,972.47 24.72 124.08 1,927.39 -151.82 261.05 5,969,992.21 643,823.89 70°19'31.733 N 148°50'1.249 W 11/29/2010 4:29:39PM Page 5 COMPASS 2003.16 Build 73 • Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 1,984.27 24.95 124.03 1,938.09 -154.59 265.16 5,969,989.52 643,828.05 70° 19'31.706 N 148°50'1.129 W 1,996.07 25.28 123.93 1,948.78 -157.39 269.31 5,969,986.80 643,832.25 70°19'31.678 N 148°50'1.008 W 2,007.97 25.55 123.90 1,959.53 -160.24 273.55 5,969,984.03 643,836.55 70°19'31.650 N 148°50'0.884 W 2,019.77 25.67 123.86 1,970.17 -163.09 277.78 5,969,981.27 643,840.83 70°19'31.622 N 148°50'0.761 W 2,031.57 25.82 123.76 1,980.80 -165.94 282.04 5,969,978.50 643,845.15 70°19'31.594 N 148°50'0.637 W 2,043.37 26.02 123.67 1,991.41 -168.80 286.33 5,969,975.72 643,849.49 70°19'31.566 N 148°50'0.511 W 2,055.17 26.22 123.80 2,002.00 -171.69 290.65 5,969,972.92 643,853.86 70°19'31.538 N 148°50'0.385 W 2,066.97 26.47 124.01 2,012.58 -174.61 295.00 5,969,970.08 643,858.26 70°19'31.509 N 148°50'0.258 W 2,078.77 26.68 124.01 2,023.13 -177.56 299.38 5,969,967.21 643,862.70 70°19'31.480 N 148°50'0.131 W 2,090.57 26.83 123.87 2,033.67 -180.53 303.78 5,969,964.33 643,867.16 70°19'31.451 N 148°50'0.002 W 2,102.37 26.97 123.77 2,044.19 -183.50 308.22 5,969,961.45 643,871.65 70°19'31.421 N 148°49'59.873 W 2,114.17 27.17 123.91 2,054.70 -186.49 312.68 5,969,958.54 643,876.17 70°19'31.392 N 148°49'59.742 W 2,125.97 27.33 124.20 2,065.19 -189.51 317.16 5,969,955.60 643,880.70 70°19'31.362 N 148°49'59.612 W 2,137.87 27.45 124.48 2,075.76 -192.60 321.68 5,969,952.60 643,885.28 70°19'31.332 N 148°49'59.480 W 2,149.67 27.62 124.89 2,086.22 -195.71 326.16 5,969,949.58 643,889.82 70°19'31.301 N 148°49'59.349 W 2,161.57 27.85 125.42 2,096.75 -198.90 330.69 5,969,946.48 643,894.41 70°19'31.270 N 148°49'59.217 W 2,173.07 27.90 125.81 2,106.92 -202.03 335.06 5,969,943.44 643,898.84 70°19'31.239 N 148°49'59.089 W 2,184.67 28.00 125.96 2,117.16 -205.21 339.46 5,969,940.33 643,903.30 70°19'31.208 N 148°49'58.960 W 2,188.97 28.10 125.97 2,120.96 -206.40 341.10 5,969,939.18 643,904.96 70°19'31.196 N 148°49'58.913 W 2,211.77 28.52 126.06 2,141.03 -212.76 349.85 5,969,932.99 643,913.83 70°19'31.134 N 148°49'58.657 W 2,239.37 28.87 126.04 2,165.24 -220.56 360.56 5,969,925.40 643,924.69 70°19'31.057 N 148°49'58.345 W 2,266.97 29.50 125.97 2,189.34 -228.47 371.45 5,969,917.70 643,935.72 70°19'30.979 N 148°49'58.027 W 2,294.57 30.18 125.80 2,213.28 -236.52 382.58 5,969,909.86 643,947.00 70°19'30.900 N 148°49'57.702 W 2,322.77 30.93 125.49 2,237.56 -244.87 394.23 5,969,901.73 643,958.81 70°19'30.818 N 148°49'57.362 W 2,351.17 31.75 125.04 2,261.82 -253.40 406.29 5,969,893.44 643,971.03 70°19'30.734 N 148°49'57.010 W 2,379.87 32.50 124.31 2,286.12 -262.08 418.84 5,969,885.00 643,983.74 70°19'30.649 N 148°49'56.644 W 2,408.77 33.22 123.49 2,310.40 -270.83 431.85 5,969,876.51 643,996.92 70°19'30.563 N 148°49'56.264 W 2,437.67 33.93 123.04 2,334.48 -279.59 445.22 5,969,868.00 644,010.45 70°19'30.476 N 148°49'55.874 W 2,466.37 34.72 122.96 2,358.18 -288.41 458.79 5,969,859.45 644,024.19 70°19'30.390 N 148°49'55.478 W 2,494.87 35.53 123.07 2,381.49 -297.34 472.54 5,969,850.78 644,038.11 70°19'30.302 N 148°49'55.076 W 2,523.17 36.38 123.26 2,404.40 -306.43 486.45 5,969,841.95 644,052.19 70°19'30.212 N 148°49'54.670 W 2,551.37 37.18 123.31 2,426.98 -315.70 500.56 5,969,832.96 644,066.47 70°19'30.121 N 148°49'54.258 W 2,579.57 38.07 122.85 2,449.32 -325.09 514.99 5,969,823.84 644,081.07 70°19'30.029 N 148°49'53.837 W 2,607.77 38.93 122.22 2,471.39 -334.53 529.79 5,969,814.69 644,096.05 70°19'29.936 N 148°49'53.405 W 2,635.97 39.58 121.69 2,493.23 -343.98 544.93 5,969,805.54 644,111.37 70°19'29.843 N 148°49'52.963 W 2,664.27 40.17 121.30 2,514.94 -353.46 560.40 5,969,796.36 644,127.02 70°19'29.750 N 148°49'52.512 W 2,692.77 40.65 120.84 2,536.64 -362.99 576.23 5,969,787.13 644,143.02 70°19'29.656 N 148°49'52.050 W 2,720.97 41.02 120.44 2,557.98 -372.39 592.09 5,969,778.04 644,159.06 70°19'29.564 N 148°49'51.587 W 2,749.27 41.35 120.17 2,579.28 -381.79 608.18 5,969,768.94 644,175.33 70°19'29.471 N 148°49'51.117 W 2,777.57 41.87 119.93 2,600.44 -391.20 624.45 5,969,759.85 644,191.77 70°19'29.379 N 148°49'50.643 W 2,805.87 42.50 119.70 2,621.41 -400.65 640.93 5,969,750.72 644,208.43 70°19'29.286 N 148°49'50.161 W 2,834.07 43.10 119.39 2,642.10 -410.10 657.60 5,969,741.59 644,225.28 70°19'29.193 N 148°49'49.675 W 2,862.27 43.72 119.29 2,662.59 -419.59 674.50 5,969,732.42 644,242.35 70°19'29.099 N 148°49'49.182 W 2,890.67 44.20 119.44 2,683.03 -429.26 691.68 5,969,723.08 644,259.71 70°19'29.004 N 148°49'48.680 W 2,918.87 44.28 119.76 2,703.23 -438.98 708.78 5,969,713.70 644,277.00 70°19'28.909 N 148°49'48.181 W 2,947.17 43.93 120.31 2,723.55 -448.84 725.84 5,969,704.17 644,294.23 70°19'28.812 N 148°49'47.683 W 2,975.47 43.78 120.84 2,743.96 -458.81 742.72 5,969,694.52 644,311.30 70°19'28.714 N 148°49'47.191 W 3,003.87 44.03 120.91 2,764.42 -468.92 759.62 5,969,684.74 644,328.39 70°19'28.614 N 148°49'46.697 W 3,032.27 44.42 120.78 2,784.77 -479.07 776.63 5,969,674.91 644,345.59 70°19'28.514 N 148°49'46.201 W 3,060.67 45.12 120.81 2,804.94 -489.31 793.81 5,969,665.00 644,362.96 70°19'28.413 N 148°49'45.700 W 3,089.17 45.75 120.95 2,824.93 -499.73 811.23 5,969,654.92 644,380.58 70°19'28.311 N 148°49'45.191 W 3,117.47 46.08 121.09 2,844.62 -510.21 828.66 5,969,644.78 644,398.20 70°19'28.208 N 148°49'44.682 W 3,145.77 46.30 121.32 2,864.21 -520.79 846.12 5,969,634.53 644,415.87 70°19'28.104 N 148°49'44.173 W 3,152.00 46.35 121.36 2,868.52 -523.13 849.97 5,969,632.26 644,419.76 70°19'28.081 N 148°49'44.060 W 3,237.90 44.30 128.44 2,928.95 -557.98 900.04 5,969,598.38 644,470.48 70°19'27.738 N 148°49'42.599 W 11/29/2010 4:29:39PM Page 6 COMPASS 2003.16 Build 73 • Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 3,331.32 41.10 136.35 2,997.64 -600.52 946.84 5,969,556.75 644,518.08 70° 19'27.320 N 148°49'41.233 W 3,364.96 40.93 139.23 3,023.03 -616.87 961.66 5,969,540.69 644,533.22 70°19'27.159 N 148°49'40.801 W 3,395.87 42.33 141.87 3,046.13 -632.73 974.70 5,969,525.08 644,546.56 70°19'27.003 N 148°49'40.420 W 3,426.75 44.36 144.52 3,068.59 -649.70 987.39 5,969,508.36 644,559.57 70°19'26.836 N 148°49'40.050 W 3,458.74 45.36 147.24 3,091.27 -668.38 1,000.04 5,969,489.93 644,572.57 70°19'26.652 N 148°49'39.681 W 3,489.93 45.08 149.89 3,113.24 -687.27 1,011.59 5,969,471.27 644,584.47 70°19'26.466 N 148°49'39.344 W 3,521.43 44.50 149.33 3,135.60 -706.41 1,022.81 5,969,452.34 644,596.06 70°19'26.278 N 148°49'39.016 W 3,552.55 44.35 149.19 3,157.82 -725.13 1,033.95 5,969,433.84 644,607.55 70°19'26.094 N 148°49'38.691 W 3,584.50 43.94 149.17 3,180.75 -744.24 1,045.35 5,969,414.95 644,619.32 70°19'25.906 N 148°49'38.359 W 3,615.46 43.64 148.96 3,203.10 -762.62 1,056.36 5,969,396.79 644,630.68 70°19'25.725 N 148°49'38.037 W 3,659.47 43.54 147.83 3,234.97 -788.46 1,072.26 5,969,371.26 644,647.07 70°19'25.471 N 148°49'37.573 W 3,708.68 43.37 149.68 3,270.70 -817.40 1,089.82 5,969,342.67 644,665.17 70°19'25.186 N 148°49'37.061 W 3,739.75 43.20 151.12 3,293.32 -835.92 1,100.34 5,969,324.35 644,676.05 70°19'25.004 N 148°49'36.754 W 3,769.90 43.30 153.24 3,315.28 -854.18 1,109.98 5,969,306.27 644,686.03 70°19'24.825 N 148°49'36.473 W 3,798.02 43.15 153.43 3,335.77 -871.39 1,118.62 5,969,289.23 644,695.00 70°19'24.655 N 148°49'36.220 W 3,831.55 43.08 153.00 3,360.24 -891.85 1,128.95 5,969,268.98 644,705.72 70°19'24.454 N 148°49'35.919 W 3,863.37 42.84 155.01 3,383.53 -911.34 1,138.46 5,969,249.68 644,715.59 70°19'24.262 N 148°49'35.642 W 3,893.94 42.87 157.12 3,405.94 -930.34 1,146.89 5,969,230.84 644,724.39 70°19'24.076 N 148°49'35.396 W 3,989.89 42.69 157.72 3,476.37 -990.51 1,171.91 5,969,171.16 644,750.56 70°19'23.484 N 148°49'34.666 W 4,083.66 42.40 156.72 3,545.45 -1,048.97 1,196.46 5,969,113.19 644,776.22 70°19'22.909 N 148°49'33.950 W 4,177.93 42.90 156.97 3,614.79 -1,107.70 1,221.57 5,969,054.96 644,802.45 70°19'22.331 N 148°49'33.217 W 4,270.68 42.07 157.25 3,683.19 -1,165.41 1,245.94 5,968,997.73 644,827.91 70°19'21.764 N 148°49'32.506 W 4,364.19 43.12 156.90 3,752.02 -1,223.69 1,270.59 5,968,939.93 644,853.68 70°19'21.190 N 148°49'31.787 W 4,457.30 42.44 156.15 3,820.36 -1,281.70 1,295.78 5,968,882.42 644,879.97 70°19'20.620 N 148°49'31.052 W 4,551.74 42.57 156.70 3,889.99 -1,340.18 1,321.30 5,968,824.44 644,906.60 70°19'20.045 N 148°49'30.307 W 4,646.43 42.14 156.09 3,959.96 -1,398.64 1,346.85 5,968,766.49 644,933.25 70°19'19.470 N 148°49'29.562 W 4,736.55 42.33 155.28 4,026.69 -1,453.84 1,371.79 5,968,711.78 644,959.25 70°19'18.927 N 148°49'28.835 W 4,834.69 43.63 156.17 4,098.48 -1,514.83 1,399.29 5,968,651.33 644,987.91 70°19'18.327 N 148°49'28.032 W 4,926.96 42.61 155.85 4,165.83 -1,572.45 1,424.93 5,968,594.22 645,014.64 70°19'17.760 N 148°49'27.284 W 5,027.56 43.53 155.51 4,239.32 -1,635.05 1,453.22 5,968,532.17 645,044.13 70°19'17.144 N 148°49'26.459 W 5,121.96 42.87 154.98 4,308.14 -1,693.74 1,480.28 5,968,474.02 645,072.30 70°19'16.567 N 148°49'25.670 W 5,217.84 42.41 158.96 4,378.68 -1,753.48 1,505.69 5,968,414.78 645,098.84 70°19'15.979 N 148°49'24.929 W ( 5,311.86 42.75 158.82 4,447.91 -1,812.82 1,528.60 5,968,355.89 645,122.88 70°19'15.396 N 148°49'24.260 W 5,406.07 44.01 157.69 4,516.38 -1,872.92 1,552.58 5,968,296.27 645,148.00 70°19'14.805 N 148°49'23.561 W 5,500.02 43.07 157.87 4,584.49 -1,932.83 1,577.05 5,968,236.84 645,173.62 70°19'14.215 N 148°49'22.847 W 5,591.62 44.28 156.18 4,650.74 -1,991.06 1,601.75 5,968,179.10 645,199.42 70°19'13.643 N 148°49'22.127 W 5,684.96 44.09 156.59 4,717.67 -2,050.67 1,627.81 5,968,120.01 645,226.62 70°19'13.056 N 148°49'21.367 W 5,783.27 43.55 155.56 4,788.61 -2,112.89 1,655.41 5,968,058.33 645,255.40 70°19'12.444 N 148°49'20.562 W 5,876.28 42.94 155.42 4,856.36 -2,170.87 1,681.85 5,968,000.87 645,282.94 70°19'11.874 N 148°49'19.791 W 5,970.00 44.06 158.27 4,924.35 -2,230.18 1,707.19 5,967,942.06 645,309.42 70°19'11.291 N 148°49'19.051 W 6,059.87 43.73 157.73 4,989.11 -2,287.95 1,730.53 5,967,884.75 645,333.86 70°19'10.722 N 148°49'18.371 W 6,153.73 43.43 157.34 5,057.10 -2,347.74 1,755.26 5,967,825.45 645,359.72 70°19'10.134 N 148°49'17.649 W 6,248.13 43.31 156.65 5,125.72 -2,407.41 1,780.59 5,967,766.28 645,386.19 70°19'9.547 N 148°49'16.911 W 6,341.20 43.17 156.14 5,193.52 -2,465.84 1,806.12 5,967,708.36 645,412.83 70°19'8.973 N 148°49'16.166 W 6,437.69 43.40 156.55 5,263.76 -2,526.43 1,832.66 5,967,648.28 645,440.52 70°19'8.377 N 148°49'15.392 W 6,531.70 43.70 156.28 5,331.90 -2,585.79 1,858.58 5,967,589.43 645,467.57 70°19'7.793 N 148°49'14.636 W 6,623.87 43.83 156.15 5,398.46 -2,644.13 1,884.29 5,967,531.60 645,494.39 70°19'7.219 N 148°49'13.886 W 6,717.80 42.70 156.04 5,466.86 -2,702.99 1,910.38 5,967,473.26 645,521.59 70°19'6.640 N 148°49'13.126 W 6,813.70 41.84 156.07 5,537.83 -2,761.94 1,936.56 5,967,414.82 645,548.90 70°19'6.060 N 148°49'12.362 W 6,908.30 41.97 154.89 5,608.23 -2,819.42 1,962.78 5,967,357.86 645,576.21 70°19'5.495 N 148°49'11.597 W 6,999.87 41.95 154.53 5,676.33 -2,874.78 1,988.94 5,967,303.02 645,603.42 70°19'4.950 N 148°49'10.835 W 7,096.15 41.84 155.23 5,747.99 -2,932.99 2,016.23 5,967,245.34 645,631.82 70°19'4.378 N 148°49'10.039 W 7,190.74 41.14 157.08 5,818.85 -2,990.30 2,041.57 5,967,188.54 645,658.24 70°19'3.814 N 148°49'9.300 W 7,285.49 40.93 156.95 5,890.32 -3,047.56 2,065.86 5,967,131.75 645,683.62 70°19'3.251 N 148°49'8.592 W 7,378.95 41.62 156.89 5,960.56 -3,104.28 2,090.03 5,967,075.51 645,708.87 70°19'2.693 N 148°49'7.887 W 11/29/2010 4:29:39PM Page 7 COMPASS 2003.16 Build 73 it • Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) ( ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 7,474.49 42.21 156.45 6,031.66 -3,162.89 2,115.30 5,967,017.40 645,735.26 70° 19'2.117 N 148°49'7.150 W 7,567.31 41.61 155.74 6,100.73 -3,219.57 2,140.42 5,966,961.22 645,761.46 70°19'1.559 N 148°49'6.417 W 7,661.06 42.53 157.36 6,170.33 -3,277.19 2,165.41 5,966,904.08 645,787.55 70°19'0.992 N 148°49'5.689 W 7,755.24 41.96 156.57 6,240.05 -3,335.46 2,190.18 5,966,846.30 645,813.43 70°19'0.419 N 148°49'4.966 W 7,849.38 42.12 157.74 6,309.96 -3,393.56 2,214.66 5,966,788.69 645,839.01 70°18'59.848 N 148°49'4.253 W 7,943.57 41.54 157.32 6,380.15 -3,451.61 2,238.67 5,966,731.12 645,864.12 70°18'59.277 N 148°49'3.553 W 8,035.11 40.99 156.92 6,448.95 -3,507.23 2,262.14 5,966,675.96 645,888.65 70°18'58.730 N 148°49'2.869 W 8,103.03 40.51 158.23 6,500.41 -3,548.21 2,279.05 5,966,635.31 645,906.34 70°18'58.327 N 148°49'2.375 W 8,129.70 40.30 159.84 6,520.72 -3,564.35 2,285.24 5,966,619.29 645,912.83 70°18'58.168 N 148°49'2.195 W 8,225.28 40.57 162.94 6,593.47 -3,623.09 2,305.01 5,966,560.95 645,933.73 70°18'57.590 N 148°49'1.619 W 8,319.75 39.76 168.72 6,665.69 -3,682.10 2,319.94 5,966,502.23 645,949.78 70°18'57.010 N 148°49'1.184 W 8,412.08 38.25 173.46 6,737.46 -3,739.47 2,328.97 5,966,445.06 645,959.91 70°18'56.445 N 148°49'0.921 W 8,506.45 37.39 182.72 6,812.06 -3,797.16 2,330.94 5,966,387.42 645,962.98 70°18'55.878 N 148°49'0.864 W 8,539.19 37.50 183.66 6,838.06 -3,817.04 2,329.83 5,966,367.53 645,962.25 70°18'55.682 N 148°49'0.896 W 8,600.12 37.33 188.95 6,886.46 -3,853.80 2,325.77 5,966,330.69 645,958.90 70°18'55.321 N 148°49'1.015 W 8,629.45 36.98 188.88 6,909.84 -3,871.30 2,323.03 5,966,313.14 645,956.49 70°18'55.149 N 148°49'1.095 W 8,692.14 35.87 193.09 6,960.29 -3,907.83 2,315.96 5,966,276.49 645,950.12 70°18'54.790 N 148°49'1.302 W 8,785.90 35.58 193.19 7,036.41 -3,961.14 2,303.51 5,966,222.96 645,938.69 70°18'54.265 N 148°49'1.665 W 8,880.19 34.74 191.75 7,113.49 -4,014.15 2,291.78 5,966,169.73 645,927.98 70°18'53.744 N 148°49'2.008 W 8,973.55 34.87 194.03 7,190.15 -4,066.09 2,279.89 5,966,117.58 645,917.09 70°18'53.233 N 148°49'2.355 W 9,067.71 35.96 193.90 7,266.89 -4,119.04 2,266.73 5,966,064.39 645,904.94 70°18'52.712 N 148°49'2.740 W 9,162.18 35.74 195.00 7,343.46 -4,172.62 2,252.92 5,966,010.57 645,892.16 70°18'52.186 N 148°49'3.143 W 9,255.83 35.69 194.72 7,419.50 -4,225.46 2,238.90 5,965,957.47 645,879.16 70°18'51.666 N 148°49'3.553 W 9,348.15 35.63 194.04 7,494.51 -4,277.59 2,225.54 5,965,905.10 645,866.79 70°18'51.153 N 148°49'3.943 W 9,443.49 35.68 194.49 7,571.98 -4,331.45 2,211.84 5,965,850.99 645,854.13 70°18'50.624 N 148°49'4.343 W 9,535.69 35.41 194.14 7,647.00 -4,383.39 2,198.59 5,965,798.81 645,841.88 70°18'50.113 N 148°49'4.730 W 9,631.93 35.48 192.08 7,725.41 -4,437.74 2,185.93 5,965,744.23 645,830.26 70°18'49.578 N 148°49'5.100 W 9,725.24 34.93 191.16 7,801.65 -4,490.43 2,175.09 5,965,691.35 645,820.44 70°18'49.060 N 148°49'5.416 W 9,817.89 32.57 191.75 7,878.68 -4,540.87 2,164.88 5,965,640.72 645,811.19 70°18'48.564 N 148°49'5.715 W 9,913.12 28.67 190.43 7,960.62 -4,588.45 2,155.52 5,965,592.98 645,802.74 70°18'48.096 N 148°49'5.988 W 10,006.62 23.99 190.26 8,044.39 -4,629.24 2,148.07 5,965,552.06 645,796.08 70°18'47.695 N 148°49'6.206 W 10,100.63 23.15 189.95 8,130.56 -4,666.24 2,141.47 5,965,514.94 645,790.19 70°18'47.331 N 148°49'6.399 W 10,193.92 22.32 190.44 8,216.60 -4,701.73 2,135.09 5,965,479.34 645,784.49 70°18'46.982 N 148°49'6.585 W 10,288.36 23.10 191.42 8,303.72 -4,737.53 2,128.18 5,965,443.42 645,778.26 70°18'46.630 N 148°49'6.787 W 10,381.69 23.26 190.90 8,389.51 -4,773.57 2,121.07 5,965,407.25 645,771.84 70°18'46.276 N 148°49'6.995 W 10,474.88 24.55 191.56 8,474.71 -4,810.60 2,113.71 5,965,370.08 645,765.19 70°18'45.911 N 148°49'7.210 W 10,500.29 24.65 191.28 8,497.81 -4,820.97 2,111.61 5,965,359.68 645,763.30 70°18'45.809 N 148°49'7.271 W 10,548.06 25.01 191.50 8,541.17 -4,840.64 2,107.65 5,965,339.94 645,759.71 70°18'45.616 N 148°49'7.387 W 10,579.54 24.76 189.78 8,569.72 -4,853.65 2,105.21 5,965,326.88 645,757.51 70°18'45.488 N 148°49'7.458 W 10,609.99 25.39 193.71 8,597.31 -4,866.28 2,102.57 5,965,314.21 645,755.13 70°18'45.364 N 148°49'7.535 W 10,642.24 27.08 198.95 8,626.24 -4,879.94 2,098.55 5,965,300.47 645,751.36 70°18'45.230 N 148°49'7.652 W 10,674.36 27.91 201.89 8,654.73 -4,893.84 2,093.37 5,965,286.48 645,746.45 70°18'45.093 N 148°49'7.804 W 10,704.69 30.11 204.84 8,681.25 -4,907.33 2,087.53 5,965,272.88 645,740.87 70°18'44.960 N 148°49'7.974 W 10,733.95 32.55 207.57 8,706.25 -4,920.97 2,080.80 5,965,259.12 645,734.41 70°18'44.826 N 148°49'8.171 W 10,766.09 34.20 212.13 8,733.09 -4,936.29 2,072.00 5,965,243.63 645,725.89 70°18'44.675 N 148°49'8.428 W 10,798.93 35.80 215.60 8,759.99 -4,951.91 2,061.49 5,965,227.81 645,715.69 70° 18'44.522 N 148°49'8.734 W 10,829.85 37.00 221.05 8,784.89 -4,966.29 2,050.12 5,965,213.22 645,704.59 70°18'44.380 N 148°49'9.066 W 10,861.54 39.63 224.62 8,809.75 -4,980.68 2,036.75 5,965,198.58 645,691.51 70°18'44.239 N 148°49'9.456 W 10,887.63 41.14 226.30 8,829.62 -4,992.53 2,024.70 5,965,186.50 645,679.69 70°18'44.122 N 148°49'9.808 W 10,925.11 43.49 228.41 8,857.34 -5,009.61 2,006.14 5,965,169.07 645,661.46 70°18'43.954 N 148°49'10.349 W 10,948.66 46.03 232.08 8,874.06 -5,020.20 1,993.39 5,965,158.23 645,648.91 70°18'43.850 N 148°49'10.721 W 10,981.39 46.98 237.35 8,896.60 -5,033.90 1,974.01 5,965,144.17 645,629.81 70°18'43.716 N 148°49'11.287 W 11,016.44 50.67 238.42 8,919.67 -5,047.92 1,951.67 5,965,129.73 645,607.73 70°18'43.578 N 148°49'11.938 W 11,047.98 54.24 239.48 8,938.89 -5,060.81 1,930.25 5,965,116.43 645,586.56 70°18'43.451 N 148°49'12.563 W 11,079.67 58.51 240.47 8,956.43 -5,074.01 1,907.40 5,965,102.80 645,563.98 70°18'43.321 N 148°49'13.230 W 11/29/2010 4:29:39PM Page 8 COMPASS 2003.16 Build 73 4 Survey Report- Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P rSurvey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,109.31 62.73 242.08 8,970.97 -5,086.41 1,884.76 5,965,089.97 645,541.57 70° 18'43.200 N 148°49'13.891 W 11,141.94 65.95 242.58 8,985.10 -5,100.06 1,858.71 5,965,075.82 645,515.80 70°18'43.065 N 148°49'14.650 W 11,173.87 69.21 243.00 8,997.27 -5,113.56 1,832.46 5,965,061.83 645,489.81 70°18'42.933 N 148°49'15.416 W 11,205.13 72.17 243.77 9,007.61 -5,126.77 1,806.09 5,965,048.11 645,463.70 70°18'42.803 N 148°49'16.186 W 11,234.36 73.58 243.80 9,016.22 -5,139.11 1,781.03 5,965,035.30 645,438.88 70°18'42.681 N 148°49'16.917 W 11,267.89 76.96 244.78 9,024.74 -5,153.17 1,751.82 5,965,020.68 645,409.95 70°18'42.543 N 148°49'17.769 W 11,296.67 80.81 244.80 9,030.29 -5,165.20 1,726.27 5,965,008.17 645,384.64 70°18'42.425 N 148°49'18.514 W 11,332.37 85.54 245.59 9,034.53 -5,180.07 1,694.10 5,964,992.69 645,352.76 70°18'42.279 N 148°49'19.453 W 11,362.01 87.68 245.86 9,036.28 -5,192.23 1,667.13 5,964,980.01 645,326.03 70°18'42.159 N 148°49'20.239 W 11,393.94 84.89 246.92 9,038.35 -5,204.99 1,637.94 5,964,966.70 645,297.09 70°18'42.034 N 148°49'21.091 W 11,422.69 88.56 249.44 9,039.99 -5,215.65 1,611.30 5,964,955.53 645,270.66 70°18'41.929 N 148°49'21.868 W 11,454.90 92.01 251.28 9,039.83 -5,226.48 1,580.97 5,964,944.12 645,240.55 70°18'41.823 N 148°49'22.753 W 11,486.62 94.86 254.42 9,037.93 -5,235.81 1,550.72 5,964,934.21 645,210.49 70°18'41.731 N 148°49'23.635 W 11,515.79 94.83 254.78 9,035.47 -5,243.53 1,522.70 5,964,925.96 645,182.62 70°18'41.655 N 148°49'24.453 W 11,543.50 97.31 254.65 9,032.54 -5,250.80 1,496.12 5,964,918.19 645,156.19 70°18'41.584 N 148°49'25.228 W 11,580.73 92.93 257.31 9,029.22 -5,259.77 1,460.16 5,964,908.53 645,120.40 70°18'41.495 N 148°49'26.277 W 11,612.61 90.58 259.00 9,028.24 -5,266.31 1,428.97 5,964,901.39 645,089.35 70°18'41.431 N 148°49'27.187 W 11,642.52 90.27 259.28 9,028.02 -5,271.95 1,399.60 5,964,895.20 645,060.09 70°18'41.376 N 148°49'28.044 W 11,671.92 90.36 259.38 9,027.86 -5,277.39 1,370.71 5,964,889.20 645,031.31 70°18'41.322 N 148°49'28.886 W 11,705.65 90.22 257.53 9,027.69 -5,284.14 1,337.66 5,964,881.82 644,998.41 70°18'41.256 N 148°49'29.850 W 11,731.29 90.25 255.49 9,027.58 -5,290.12 1,312.73 5,964,875.36 644,973.60 70°18'41.197 N 148°49'30.578 W 11,767.61 90.87 255.48 9,027.23 -5,299.23 1,277.57 5,964,865.59 644,938.62 70°18'41.108 N 148°49'31.603 W 11,797.94 91.02 256.48 9,026.73 -5,306.57 1,248.15 5,964,857.68 644,909.35 70°18'41.036 N 148°49'32.461 W 11,825.11 91.00 256.45 9,026.25 -5,312.93 1,221.74 5,964,850.82 644,883.06 70°18'40.973 N 148°49'33.232 W 11,857.60 88.25 257.05 9,026.46 -5,320.38 1,190.12 5,964,842.77 644,851.59 70°18'40.900 N 148°49'34.154 W 11,887.25 89.61 257.47 9,027.01 -5,326.91 1,161.20 5,964,835.68 644,822.81 70°18'40.836 N 148°49'34.998 W 11,919.06 89.94 257.13 9,027.14 -5,333.91 1,130.17 5,964,828.10 644,791.92 70°18'40.767 N 148°49'35.903 W 11,948.85 90.15 257.32 9,027.11 -5,340.49 1,101.12 5,964,820.96 644,763.00 70°18'40.702 N 148°49'36.750 W 11,982.96 89.66 257.50 9,027.17 -5,347.93 1,067.83 5,964,812.89 644,729.86 70°18'40.629 N 148°49'37.721 W 12,015.01 89.43 257.37 9,027.43 -5,354.90 1,036.55 5,964,805.32 644,698.72 70°18'40.561 N 148°49'38.634 W 12,041.13 88.80 257.28 9,027.83 -5,360.63 1,011.07 5,964,799.10 644,673.36 70°18'40.504 N 148°49'39.377 W 12,071.64 87.93 257.84 9,028.70 -5,367.20 981.29 5,964,791.97 644,643.71 70°18'40.440 N 148°49'40.246 W 12,103.86 87.48 258.24 9,029.99 -5,373.87 949.79 5,964,784.69 644,612.35 70°18'40.374 N 148°49'41.165 W 12,134.14 84.97 260.07 9,031.98 -5,379.56 920.12 5,964,778.44 644,582.80 70°18'40.318 N 148°49'42.030 W 12,163.99 83.18 260.33 9,035.06 -5,384.61 890.87 5,964,772.83 644,553.65 70°18'40.269 N 148°49'42.883 W 12,194.30 82.50 259.62 9,038.84 -5,389.85 861.25 5,964,767.03 644,524.14 70°18'40.217 N 148°49'43.747 W 12,225.13 85.02 259.38 9,042.19 -5,395.43 831.12 5,964,760.87 644,494.12 70°18'40.162 N 148°49'44.626 W 12,258.63 88.76 258.80 9,044.01 -5,401.76 798.28 5,964,753.91 644,461.41 70°18'40.100 N 148°49'45.584 W 12,283.82 91.35 258.97 9,043.99 -5,406.62 773.56 5,964,748.59 644,436.80 70°18'40.052 N 148°49'46.305 W 12,319.99 93.84 257.31 9,042.35 -5,414.04 738.21 5,964,740.49 644,401.59 70°18'39.979 N 148°49'47.336 W 12,351.33 95.96 257.55 9,039.67 -5,420.84 707.73 5,964,733.11 644,371.25 70°18'39.912 N 148°49'48.225 W 12,380.89 97.40 257.78 9,036.23 -5,427.11 679.05 5,964,726.29 644,342.70 70°18'39.851 N 148°49'49.062 W 12,414.02 95.65 257.77 9,032.47 -5,434.08 646.88 5,964,718.71 644,310.67 70°18'39.782 N 148°49'50.000 W 12,444.89 93.29 257.55 9,030.06 -5,440.66 616.82 5,964,711.56 644,280.74 70°18'39.718 N 148°49'50.877 W 12,475.46 90.94 257.54 9,028.94 -5,447.24 586.99 5,964,704.40 644,251.05 70°18'39.653 N 148°49'51.747 W 12,504.58 91.44 258.39 9,028.33 -5,453.31 558.52 5,964,697.79 644,222.70 70°18'39.593 N 148°49'52.578 W 12,563.20 91.14 257.60 9,027.01 -5,465.50 501.20 5,964,684.50 644,165.63 70°18'39.473 N 148°49'54.250 W 12,601.63 89.85 257.53 9,026.68 -5,473.78 463.67 5,964,675.51 644,128.27 70°18'39.392 N 148°49'55.344 W 12,660.69 89.97 258.09 9,026.77 -5,486.25 405.94 5,964,661.94 644,070.79 70°18'39.269 N 148°49'57.028 W 12,753.89 89.92 258.10 9,026.86 -5,505.47 314.75 5,964,640.98 643,979.99 70°18'39.080 N 148°49'59.688 W 12,849.10 89.85 259.33 9,027.05 -5,524.11 221.38 5,964,620.56 643,887.00 70°18'38.897 N 148°50'2.412 W 12,900.46 89.82 259.90 9,027.20 -5,533.36 170.86 5,964,610.34 643,836.67 70°18'38.806 N 148°50'3.885 W 12,946.36 91.12 259.88 9,026.82 -5,541.42 125.68 5,964,601.42 643,791.66 70°18'38.727 N 148°50'5.203 W 13,039.80 88.51 259.67 9,027.13 -5,558.01 33.73 5,964,583.08 643,700.05 70°18'38.564 N 148°50'7.885 W 13,133.79 89.93 260.26 9,028.40 -5,574.38 -58.81 5,964,564.94 643,607.85 70°18'38.403 N 148°50'10.584 W 11/29/2010 4:29:39PM Page 9 COMPASS 2003.16 Build 73 Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: J-20C Actual @ 68.67ft(Doyon 141) Site: PB J Pad MD Reference: J-20C Actual @ 68.67ft(Doyon 141) Well: J-20 North Reference: True Wellbore: J-20C Survey Calculation Method: Minimum Curvature Design: J-20C Database: EDM.16-Anc Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 13,214.42 90.29 260.98 9,028.25 -5,587.52 -138.36 5,964,550.28 643,528.57 70°18'38.273 N 148°50'12.905 W 13,316.10 89.45 261.78 9,028.48 -5,602.76 -238.89 5,964,533.12 643,428.36 70°18'38.123 N 148°50'15.837 W 13,409.33 91.89 261.06 9,027.39 -5,616.67 -331.07 5,964,517.46 643,336.47 70°18'37.987 N 148°50'18.525 W 13,502.76 90.27 263.24 9,025.63 -5,629.43 -423.60 5,964,502.93 643,244.21 70° 18'37.861 N 148°50'21.224 W 13,599.36 90.13 262.62 9,025.29 -5,641.32 -519.46 5,964,489.21 643,148.60 70° 18'37.744 N 148°50'24.020 W 13,691.05 88.79 257.24 9,026.16 -5,657.34 -609.70 5,964,471.46 643,058.69 70°18'37.586 N 148°50'26.652 W 13,723.55 89.05 258.15 9,026.77 -5,664.27 -641.45 5,964,463.93 643,027.08 70°18'37.518 N 148°50'27.578 W 13,783.90 90.60 253.46 9,026.95 -5,679.06 -699.93 5,964,448.02 642,968.89 70°18'37.373 N 148°50'29.284 W 13,826.91 90.09 253.27 9,026.69 -5,691.37 -741.14 5,964,434.93 642,927.93 70°18'37.252 N 148°50'30.486 W 13,881.92 88.57 252.50 9,027.34 -5,707.56 -793.71 5,964,417.74 642,875.69 70°18'37.092 N 148°50'32.020 W 13,979.54 89.47 252.56 9,029.01 -5,736.86 -886.81 5,964,386.66 642,783.17 70° 18'36.804 N 148°50'34.735 W 14,064.39 92.17 253.55 9,027.79 -5,761.59 -967.96 5,964,360.39 642,702.51 70° 18'36.561 N 148°50'37.102 W 14,162.75 91.33 252.91 9,024.79 -5,789.95 -1,062.10 5,964,330.23 642,608.95 70° 18'36.282 N 148°50'39.847 W 14,243.89 92.22 254.38 9,022.28 -5,812.79 -1,139.91 5,964,305.91 642,531.59 70° 18'36.057 N 148°50'42.117 W 14,295.00 92.22 254.38 9,020.30 -5,826.54 -1,189.10 5,964,291.22 642,482.68 70°18'35.922 N 148°50'43.552 W Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 10,534.34 8,528.73 DRILLING LINER 1 7.000 8.500 2,976.34 2,744.59 13 3/8" 13.375 17.500 Checked By: Approved By: Date: 11/29/2010 4:29:39PM Page 10 COMPASS 2003.16 Build 73 K Data Analyzer Query Results Query Name: LOT/FIT Fixed Field Data by Wellbore Comm.WB Surface Date LOT/FIT MW(ppg) TVD(ft) TMD(ft) BHP(psi) EMW(ppg) Name Press(psi) J-20C :11/6/2010 1 1:30:00 PM LOT i 9.80: 2,865.98: 3,148.34: 200.0: 1,659.9: 11.14 J-20C :11/15/2010 6:00:00 PM FIT i 8.50 8,554.659 10,561.349 495.0? 4,273.14 9.61 12/20/2010 16:58 Page 1 of 1 ......._....... J-20C - 7" Drilling Liner Lap(Pm 210-124) Page 1 of 1 r Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Wednesday, November 10, 2010 10:37 AM To: 'Rose, John G (ASRC)' Cc: Egbejimba, Uchenna J Subject: RE: J-20C -7" Drilling Liner Lap(PTD 210-124) John, The proposal is acceptable and will not require any variances as long as the liner lap is at least 100' as detailed in 20 AAC 25.030 (d)(6) . It appears that the deepest you can go without a variance is about 3050' and with the TOL ( 7" liner) . The schematic shows a TOW for 9 5/8"at 3166' and which is different that what you mentioned below ( 3152' md ) .... Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose,John G (ASRC) [mailto:John.G.Rose @bp.com] Sent: Wednesday, November 10, 2010 10:16 AM To: Schwartz, Guy L(DOA) Cc: Egbejimba, Uchenna J Subject: 3-20C - 7" Drilling Liner Lap (PTD 210-124) Guy, With the top of our J-20C 9-5/8"window at 3152' MD and as we are trying to leave enough room above the 7" liner top on this well for a future 9-5/8" sidetrack opportunity, the liner 7" lap for this well will be reduced from the normal -150'to some a lesser value not the be less than 100'which will maximize the distance from the top of this liner to the existing 13-3/8" casing shoe at 2978' MD. I have attached a copy of the proposed J-20C well for your reference and please don't hesitate to give me a call if you have any questions or concerns. Thanks -jr <<J-20C Proposed.ZIP» John G.Rose BP Staff Engineer Anchorage,AK rose11@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home 11/10/2010 TREE CIW 4-1/8"5K WELLHEAD= MCEVOY 2 0 C ,.. ACTUATOR= KB.ELEV= 67.5 "PROPOSED" BF.ELEV= 39.5 KOP= 3145 Max Angle= 90 Datum MD= I I 4-1/2"X-Nipple(ID=3.813")2000' MD Datum TVD= 8800'SS 4-1/2", 12.6#, 13Cr,VamTop Tubing to 10,390' MD 13-3/8"CSG,72#, L-80,ID=12.347" 2978' , Top 7" Liner To at'3016' MD(150' Liner Lap) Minimum ID = 3.725" @ xxxx' - ---9-5/8"x 7"Baker ZXP Pkr-3026' MD 4-1/2" XN Nipple TOW,;34961VfD �tsz ' ttl'o _ 424- e r,.,.;ci y/w 9-5/8"CIBP 3191' MD— -_—-. ''/•10.10 Fully Cemented 7", 26#, L-80 Scab Line 3191'- 10,792' MD —4-1/2", 12.6#, 13Cr,VamTop Tubing to ►t 10,395'MD (5' Into 4-1/4"Prod Line TBS) 4-1/2"Kill String Cut-3300' MD "^ Top P&A Cement Plug-9879'MD I I 4-1/2"WLEG 10,740' MD I I 4-1/2"X-Nipple(ID 3.813")-10,275' MD 9-5/8"X 7"BAKER ZXP PKR --I 10798' z . -7"x 4-1/2"HES TNT Pkr- 10,295' MD W/TIEBACK, ID=7.5" I I 4-1/2"X-Nipple (ID 3.813")-10,325' MD "JUNK" 10,872' MD �t I I 4-1/2"XN-Nipple(ID 3.725")-10,395'MD /2"WLEG-10,405' MD 4-1/2"WRP w/sluggits 10,879' MD -7"x4-1/2"Baker Liner Top-10,400' MD TOP OF 7"LNR -I 1088T , . 4 9-5/8"CSG,47#,L-80, ID=8.681" -I 11152' I :4-7141,, 26#, L-80,VamTop HC Liner to 10,550'MD 7"LNR,26#, L-80, .0383 bpf, ID=6.276" -I 12250' �•••�•� OA— -1/2' 12.6#, L-80, IBT-M Liner to J-20 Original Well 12,250' MD 4,290`MD Baker Liner Top Packer 11,353' MD J-20B 3-1/2"x2-7/8""coil"Liner 13,185' MD , ' .,.. J-20A RST 4-1/2"Liner at 14,140' MD PERFORATION SUMMARY \ 4:::::::: REF LOG: MEMORY CCL/GR/CNL ON 10/17/02 ANGLE AT TOP PERF:88 @ 12100' Note:Refer to Production DB for historical pert data GAS LIFT MANDRELS SIZE SPF INTERVAL Opn/Sqz DATE ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 2 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/28/90 LGM ORIGINAL COMPLETION 07/27/10 jgr proposed J-20C RST WELL: J-20C 08/11/96 SIDETRACK(J-20A) PERMIT No: 2021700 10/19/02 JDM/KK CTD SIDETRACK(J-20B) API No: 50-029-21716-03 05/30/09 N4ES RWO OPS SHUTDOWN(J-20B) SEC 9,T11 N,R13E, 1215'SNL&802'WEL 06/01/09 PJC _DRLG DRAFT UPDATES 03/19/10 SV DRAFT CORRECTION BP Exploration(Alaska) sTfor armi;:t\ SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION C OM/Ma SSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-20C BP Exploration (Alaska), Inc. Permit No: 210-124 Surface Location: 1215' FNL, 802' FEL, SEC. 09, T11N, R 13E, UM Bottomhole Location: 1755' FNL, 2008' FEL, SEC. 16, T11N, R13E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Chair DATED this 9 day of September, 2010. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA FCE VEDA ALA ■OIL AND GAS CONSERVATION COM, HON 1011,1 �a� PERMIT TO DRILL 20 AAC 25.005 PkiF t5.GZ L'1 Fla:DM.Cinaission 1 a.Type of work: lb.Proposed Well Class: 0 Development Oil ❑Service-Winj ❑Single Zone 1c. Specify,ilf d�reld,i oposed for: ❑ Drill ®Redrill ❑ Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone ❑Coalbedl 6ai NU Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ❑Shale Gas 2. Operator Name: 5.Bond: ❑ Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU J-20C 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 14291' TVD 8963'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028281;028284 1215'FNL,802'FEL, SEC 09,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1068'FNL,4326'FEL, SEC 15,T11N, R13E, UM October 8,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 1755'FNL,2008'FEL,SEC 16,T11N, R13E, UM 2560 21,000' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 67.5' feet 15.Distance to Nearest Well Open Surface: x- 643560 y-5970139 Zone- ASP4 GL Elevation above MSL: 39.5' feet to Same Pool: 400' 16.Deviated Wells: Kickoff Depth: 3165' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 97 degrees Downhole: 3820 Surface: 2966 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-1/2" 7" 26# L-80 VamTop He 7534' 3016 2772' 10550' 8538' 279 Cu ft Class'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M solid 3891' 10400' 8407' 14291'_ 9031' 551 cu ft Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 13230' 9010' 10879' 13185' 901.2' —10872' Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 8 cu vds Concrete 110' 110' Surface 2978' 13-3/8" 4127 cu ft Permafrost 2978' 2746' Intermediate 11152' 9-5/8" 2141 cu ft Class'G'.230 Cu ft Class'G' 11152' 8382' Production Liner 471' 7" 438 Cu ft Class'G' 10887'- 11304' 8197'-8487' Liner 880' 4-1/2" 473 cu ft Class'G' 10798'- 11678' 8136'-8756' Liner 1869' 3-1/2"x 3-3/16"x 2-7/8" 90 cu ft Class'G' 11361'-13230' 8526'-9010' Liner 7601' 7" 1095 cu ft CI ss'G' 3191'-10792' 2896'-8132' Perforation Depth MD(ft): Below Plug: 12100'-13170' Perforation Depth ND(ft): 8997'-9013' 20.Attachments: ❑ Property Plat ❑ BOP Sketch 0 Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis 0 Diverter Sketch ❑Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact John Rose,564-5271 Printed Name John Egbejimba Title Engineering Team Leader 37U Prepared By Name/Number Signature 3. Phone 564-5859 Date R , ,0 Elizabeth Barker,564-4628 Commission Use Only Permit To Drill / Number: Permit p ov Date: See cover letter for Number: a/7/ 74 50-029-21716-03-00 ti IQ. lib other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed met ane,gas hydrates,or gas contained shales: le Other: 3500 pS %�u� P —7-e-- eS Samples Req'd: 0,Yes ®No Mud Log Req'd: 0/Yes F(No 2 CQ ,,,.1 1A... i, 7 3-�-�n...,) HZS Measures: Yes ❑No Directional Survey Req'd: "Yes ❑No J p dos` — / Date BY THE COMMISSION v Date �/ ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate ORIGINAL ,Li. , • y bP 0 To: Alaska Oil & Gas Conservation Commission From: John Rose, ODE Date: August 27, 2010 Re: J-20C Sidetrack Permit to Drill Well J-20C is currently scheduled to be drilled by Doyon 141 beginning on October 08, 2010. Maximum anticipated surface pressure from the Sag with a full column of gas from TD to surface is 2966 psi. We will be utilizing Doyon 141's 5000 psi four preventer stack (3 rams and an annular). The BOPs will be tested to 3500 psi. The sidetrack plan for the J-20C includes the following: 1. Perform full-bore cement job setting a cement plug from the top of the WRP at 10,879' MD back . up the well to 9792' MD and perform CMIT-TxIA tQ2500 psi. 2. Make 4-1/2"tubing cut at 9600' MD. _ 3. MIRU Doyon 141. 4. Pull the 4-1/2" kill-string from the pre-rig cut at 9600' MD. 5. Set and test an EZSV in the 9-5/8" casing at 3191' MD for a whipstock departure of the well from -3174' MD (mid-window in 9-5/8"casing). 6. Drill 8-1/2" hole to TSAG at-10,550' MD.- 7. Run and cement(1000'tail job)a 7"drilling liner with 150' liner lap. 8. Drill 6-18" production hole to the final well TD at 14,316' MD (Ivishak Zone 2 horizontal). - 9. Run and fully cement a 4-1/2"production liner. 10. Drillpipe perforate the well (-1000'2-7/8"guns).- 11. Run 4-1/2"chrome completion. 12. ND BOP/NU tree&freeze protect well. 13. RDMO well. , Please find attached the J-20C Well Plan Summary, directional plan and proposed completion diagram. If you have any questions or require any additional information, please contact me at 564-5271. J-20C PTD Page 1 8/27/2010 Planned Well Summary Well J-20C Type Producer Objective Ivishak API Number: 50-029-21716-03 Current Status Shut-In Estimated Start Date: 1 10/08/10 Time to Complete: 1 28.9 Days Surface Northing Easting Offsets TRS Location 5,970,139 643,560 1215' SNL/802' WEL 11N, 13E, 9 TSAG Northing Easting TVDss Offsets TRS 5,965,350 645,762 -8,460 766' FNL /3982' FEL 11N, 13E, 15 Production Northing Easting TVDss Offsets TRS Hole 5,965,041 645,424 -8,955 1068' FNL/ 3478953' 11N, 13E, 15 Target FWL Locations 5,964,840 644,840 -8,958 1258' FNL/365' FWL 11N, 13E, 15 BHL 5,964,298 642,478 -8,963 1755' FNL /3272' FWL 11N, 13E, 16 Planned KOP: ( 3165'MD / 2796'TVDss Planned TD: 1 14,291'MD / 8963' TVDss Rig: I Doyon 141 GL/RT: 1 39.5'/28' RTE: 1 67.5 Directional — Sperry WP06 KOP: 1 3165' MD Maximum Hole Angle: -47° in the 8-1/2"intermediate section -97° in the 6-1/8" production section Close Approach Wells: All off-set wells pass Major Risk Analysis Survey Program: 3145'to 3350' MD = INC +Trend 3350'to 14,291' MD = MWD+IIFR+MS Nearest Property Line: 21,000(north/east) Nearest Well within Pool: 400'(Q-03A) J-20C Wellplan 8/31/2010 4 Current Well Information Well Name: J-20B API Number: 50-029-21716-02 PTD: 2021700 Well Type: Producer Current Status: Shut in BHP: 3180 psi @ 8816'TVDss (7.0 ppg) BHT: 213° F @ 8800'TVDss Mechanical Condition: Kill String: 4-1/2", 12.6#, L-80, TC-II to 10,740' MD (Planned Tubing cut at -9600' MD.) TD/PBTD: 13,185' MD (NOTE: Top"junk"at-10,872' MD) Max DL(to 10,782' MD): 4.8°/100' CP 787' MD Max Angle (to 10,782' MD): -45° by-2800' MD (45-47 deg to top junk at 10,782' MD) Wellhead Equipment: McEvoy SSH Starting Head: 13-5/8"x 13-5/8"5000 psi w/2-2-1/16"outlets Tbg. Spool: 13-5/8" 5000 psi x 13-5/8" 5000 psi w/2 - 2-1/16" outlets (may be re- used) Tbg. Hanger: 13"x 4.5"TC-II top and bottom threads(may be re-used) Csg. Hanger: McEvoy 9-5/8" mandrel hanger Tbg. Head Adapter: 13-5/8"5K x 4-1/8"5K(may be re-used) Tree: Cameron 4-1/8"5K(may be re-used) BPV Profile: 4"Type H Completion Equipment: SSSV Landing Nipple: none Control line: none Gas Lift Mandrels: none Control line bands/clamps: none Casing Equipment: Surface Casing: 13-3/8", 72#, L-80 to 2987' MD 13-3/8"Cement: Fully cemented to surface. Intermediate Casing: 9-5/8", 47#, L-80 to 11,152' MD 9-5/8"Cement: Estimated TOC at minimum 5512'MD up to 3454' MD. Tubing Fluids: seawater w/-2500'diesel cap IA Fluids seawater w/-2500'diesel cap OA Freeze Protection 13-3/8"x 9-5/8"=dry crude to -2256' MD w/cement to shoe at 2978' MD Perforations: The current perforations at 12,100' - 13,170' MD to be isolated below P&A a --1000'+ cement plug set f/top of the junk/WRP at 10,879' MD to 9792' MD. o l� Pre-Rig MIT/PPPOT Data: MIT-OA - Test to 2000 psi. CMIT-TxIA - Test to 2500 psi. Q-G PPPOT-T - Test to 5000 psi. PPPOT-IC - Test to 3500 psi. J-20C PTD Page 3 8/26/2010 Formation Tops & Pore Pressure Estimate (SOR) (7)Formation Tops(TVDss)and Estimated Pore P_ressures Commercial Hydrocarbon Est.Formation Tops Uncertainty _ Bearing Est.Pore Press. Est.Pore Press. Formation (TVDSS) (feet) (Yes/No) (Psi) (ppg EMW) NOTE:All formation tops are required from 1000'above proposed KOP to TD for sidetracks NOTE:All formation tops are required from surface to TD for all new wells SV4 -2657 50+/- No 1196-1326 8.7-9.6 KOP -2795 50+/- No 1258-1395 8.7-9.6 SV3 -3104 50+/- No 1397-1549 8.7-9.6 SV2 -3242 50+/- No 1459-1618 8.7-9.6 SV1 -3625 50+/- No 1631-1809 8.7-9.6 UG4 -3990 50+/- No 1796-1991 8.7-9.6 UG3 -4280 50+/- No 1926-2136 8.7-9.6 UG1 No 8.7-9.6 WS2 -5309 50+/- No 2389-2649 8.7-9.6 WS1 -5524 50+/- No 2486-2756 8.7-9.6 CM3 -5707 50+/- No 2568-2848 8.7-9.6 THRZ -6910 30+/- No 3110 9.5-9.7 BHRZ -7160 30+/- No 3222 9.5-9.7 LCU/Top Kingak -7180 30+/- No 3231 9.5-9.7 TJB -8292 30+/- No 3731 9.5-9.7 TJA -8355 30+/- No 3760 9.5-9.7 TSGR -8460 30+/- Yes 3046 6.9 TSHU -8496 30+/- Yes 3059 6.9 TSAD -8575 30+/- Yes 3087 6.9 TCGL -8741 30+/- Yes 3147 6.9 BCGL -8816 30+/- Yes 3180 6.9 23SB -8888 30+/- Yes 3200 6.9 PGOC -8900 30+/- Yes 3204 6.9 HOT -8955 30+/- Yes 3224 6.9 22TS -8935 30+/- Yes 3217 6.9 21TS -8975(not reached) 30+/- Yes Well TD Criteria Drill to planned TD unless drilling conditions deteriorate. (ie ??ft TVD,??ft Rathole,etc.) Comments BCGL Pore Pressure is estimated from surounding wells. Data based on normal gradient.45psi/fr to TSGR and 0.36 psi/ft through reservoir section. Awaiting a static pressure test on Q-02(08/102010).Pore range from SV4 to CM3 is based on normal water gradient and highest expected overpressure from injection in GCl and GC2.HRZ-Kingak pore pressure based on Kingak well bore stability study. Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD/TVDrkb 8-'/2" 7" - 26# " L-80 VaHC°p 7,240 5,410 7534' 3016'/2772' 10,550'/8538' • IBT-M - 6-1/8" 4th" " 12.6# L-80 Solid 8,430 7,500 3891' 10,400/8407' 14,291'/9031' • Liner Tubing 4 t/" _ 12.6# 13Cr-80 _ Vam-Top_ 8,430 7,500 10,400' Surface 10,400'/8407' J-20C PTD Page 4 8/26/2010 Mud Program Intermediate Mud Properties: LSND I 8-1/2"hole section Depth Interval Density(ppg) PV YP API FL HTHP FL MBT PH 3165'-8800' 9.8 10-22 18-28 4—8 NC <20 9—10 (KOP to HRZ) 8800'-10,550' 10.4 12-22 18-28 4—6 <10 cc's at <20 9— 10 THRZ to TSAG 200 deg F Production Mud Properties: FLOPRO SF Reservoir Drill-in Fluid I 6-1/8" hole section Depth Interval Density(ppg) PV YP LSVR API Fl pH MBT 10,550'-14,291' 8.4—8.8 8-12 22-28 >20,000 6.0-8.0 9.0-9.5 <3 Logging Program 8-1/2" Intermediate: Sample Catchers—as required by Geology Drilling: Dir/GR/Res(real time) Open Hole: None • Cased Hole: Tie MWD logs into PDC log and ensure at least 200' overlap. 6-1/8" Production: Sample Catchers—as required by Geology Drilling: Dir/GR/Res/Neu/Den (both for the build and lateral BHA's-all real time Open Hole: None Cased Hole: None Cement Program Casing Size 7"26#, L-80 Intermediate Liner Basis: Lead: None Tail: Volume of open hole+40%excess+ 80'shoe track+ 150' of liner lap+200' of 9-5/8"x 4" DP excess. Tail TOC: 9550' MD ( = ---- -- • - -- - Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12.5 ppg (Mud Push II) Volume: Lead Tail 50 bbls 9 cuft,241 sks 15.8 lb/gal Class G +adds—1.17 cuft/sk • Temp '`BFIST 200° F, BHCT TBD by Schlumberger Casing Size 4.5" 12.6#,L-80 IBT-M Production Liner Basis: Lead: None Tail: Volume of open hole+40%excess+ 80'shoe track+ 150' of liner lap+200'of 7"x 4" DP excess. Tail TOC: 10,400' MD (TOL w/excess will be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Volume: Lead N/ Tail 98.4 bbls 551.1 cuft,475.3 sks 15.8 lb/gal Class G +GasBlok+adds—1.17 cuft/sk Temp "-BHSF- 213° F, BHCT TBD by Schlumberger J-20C PTD Page 5 8/26/2010 Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. At surface J-23 is 34'to the north and J-09 is to the south 33'. Close Approach Shut-in Wells: There are no wells requiring shut-in due to close approach issues. - Hydrogen Sulfide J-Pad is not considered an H2S site. Recent H2S data from the pad is as follows: - Well Name H2S Date of Reading #1 Closest SHL Well H2S Level J-09A 12 ppm 7/31/2009 #2 Closest SHL Well H2S Level J-23A 10 ppm 2/12/2010 #1 Closest BHL Well H2S Level Q-03A `10 ppm 4/22/2010 #2 Closest BHL Well H2S Level H-20 ,16 ppm 1/8/2010 Max.Recorded H2S on Pad/Facility _J-26 110 ppm 12/15/1997 Other Relevant H2S Data J-pad is not considered an high H2S pad. NOTE: J-26 has not (H2S alarms from rigs,etc.) had readings>100 ppm since 1998. Faults The planned J-20C RST will not cross any mapped faults. There are two significant faults in the area. Fault#1 is a NW-SE trending, down to the SW fault with -130 ft of offset at TSHU. Fault#1 was cut by the J-09 and J-08A, both with lost circulation (see below).The JX-02, and the Q-04 (-100 ft of offset estimated from logs) also penetrated Fault#1, but neither apparently had losses. Fault#1 cuts upsection at least has high as the THRZ. Fault#2 is an E-W trending fault with 30-50 ft of down to the N offset at TSHU. Fault#3 was cut by the H-20 and probably by the Q-02A, neither of which noted losses. After a high kickoff, the well is planned to stay above and north of the fault plane of Fault#1. The well then curves around to the West, staying parallel to and north of Fault#2. Dips should be nearly flat in the production section except near the BHL. From -13,450 MD to TD, dips may be up to 11/20 to the East. Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893)f/guidance. J-20C PTD Page 6 8/26/2010 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP regular test frequency for J-20C will be 14 days during drilling phase and 7 days during decompletion and surface casing work. Intermediate Interval Maximum anticipated BHP 3820 psi © TSAG at 8543'TVDss (8.6 ppg EMW) Maximum surface pressure 2966 psi (.10 psi/ft gas gradient to surface) 58.6 bbls with 11.1 ppg frac gradient, assuming a maximum 8.6 ppg max Kick tolerance pore pressure in the Sag and 10.4 ppg MW. NOTE: A 11.8 ppg FIT/LOT will be required to satisfy ECD management concerns for this interval of the well. Planned BOP test pressure Rams test to 3,500 psi/250 psi. ./ Annular test to 2,500 psi/250 psi 9-5/8" Casing Test/7" 3500 psi surface pressure Casing Integrity Test—8-1/2" hole FIT/LOT after drilling 20'-50'from middle of window 7"Casing The VBRs will be changed to 7" rams to accommodate the 7"drilling liner Production Interval Maximum anticipated BHP 3820 psi © TSAG at 8543'TVDss (8.6 ppg EMW) Maximum surface pressure 2966 psi (.10 psi/ft gas gradient to surface) � Infinite with 8.9 ppg frac gradient,assuming a maximum 8.6 ppg max Kick tolerance pore pressure in the Sag and 8.5 ppg MW. NOTE: A 10.7 ppg FIT/LOT will be required to satisfy ECD management concerns. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi Integrity Test—6-1/8" hole LOT/FIT after drilling 20'of new hole Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Other Request: Given rig floor height limitations, a MASP<3000 psi, and the fact that the three ram drilling BOP configuration is preferred to a two ram configuration with a spool, BPXA will execute the provisions of 20 MC 25.285 (f) (1) regarding the initial testing of the BOPE as follows when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams: That lowest set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the three-ram drilling BOP stack. J-20C PTD Page 7 8/26/2010 Doyon 141 BOPE Scnematic 1 A ., . ..--,- . 7I2 . X • ? ":-. e 21 - • A •-]1. 1 rx t ,t '• ."'* ''' : • X L--V• " V ... . .., „. ,-,- ... . ,.. _., ,_. . Al i 2.• ''. 12 ii- i •-• - --: ii I i 1 .• 1 - , _ 10--- , ,,..- , .; §,S e= - 1 i . A K.., -'$ 4 b . 4 i gi -wow 10._ AS , , . II 1 .--------- •i7 4 ,•4 .., • ..,ri •-• 0, 0, Al. LA A, ... 44 • 9. 1 \ - ! 161 A C !,'1 7 c-...., .. . . ..„ A 3 .14 ,No t-1 ..,,-, 5 0 - if -• . 7 .Z': ;'' (7) .4 0 J-20C PTD Page 8 8/26/2010 Wellplan Addendum Contingency for well control when non-shearable equipment is across the BOPE shear rams This document will provide guidance for rig operations when a well control event arises and there is non-shearable equipment hanging from the derrick across the BOPE shear rams. Prior to picking up or running any equipment or tools in the hole, a PJSM and discussion is required to identify and note any equipment which will be run through the BOPE and is non- shearable. A risk assessment shall be performed for any equipment which is deemed non-shearable. The risk assessment must address the following: 1. Can variable bore rams seal against the equipment? 2. Can an annular preventer seal against the equipment? 3. Is a cross-over readily available to make-up into equipment? 4. Is a single joint or full stand of DP readily available to lower equipment below the BOPE stack? 5. How the equipment can be intentionally dropped down hole. 6. Are weights of equipment known so that hydraulic jacking force of wellbore pressure can be calculated. 7. Accurate and up to date shearing capabilities for the current shear rams installed is available. 8. Has each crew member been versed on individual roles and responsibilities? If there is a well control event happens with non-shearable equipment across the BOPE shear rams, the following procedure should be followed: 1. Based on the risk assessment above, gain control of the well by either: a. Closing the appropriate preventer(pipe ram, VBR, or annular) or b. Placing a sealable piece of equipment across the BOPE and closing the appropriate preventer or c. Dropping equipment and closing the Blind or Blind/Shear rams. 2. If well conditions permit, contact appropriate personnel. If not, proceed with well kill operations. This may include placing shearable equipment (i.e. drillpipe) across the shear rams by stripping in/out of the hole. J-20C PTD Page 9 8/26/2010 J-2k,; RST Operations Summary Well Status Prior to Pre-Riq Work: ✓ Well work was suspended 5/31/09 after a failed RWO leaving"junk" in the well at -10,872' MD. ✓ A 4-1/2"kill-string is in the well to 10,740' MD. ✓ The well was successfully tested to 3500 psi (both sides of the kill string) on 5/19/09. ✓ The well is loaded with seawater and 185 bbls of diesel (-2500' on both sides of the kill string. ✓ The 9-5/8" pack-off was successfully replaced on 5/20/09. ✓ The PPPOT-T test to 5000 psi was good on 4/18/09. ✓ Well has cemented OA as part of the down-squeeze freeze protect on the original well as drilled and the well has history of passing OA tests. Proposed Pre-ria prep work: F 1. Full-bore cement down the 4-1/2" kill string to the top of the junk/WRP at 10,879' MD and up the annulus leaving TOC in the kill string and annulus at 9792' MD. F 2. CMIT-TxIA to 2500 psi, MIT-OA to 2000 psi. S 3. Drift the 4-1/2"tubing to TOC to confirm the ability to cut the tubing. E 4. Make tubing cut at 200' above TOC at-9600' MD (new TC-II kill string worth salvage efforts). F 5. Circ out well to seawater and freeze protect upper 2200'on both sides of the tubing with diesel. OMIT-TxIA to 2500 psi. W 6. PPPOT-T, PPOT-IC and service LDS. ✓ 7. Set BPV. Planned Rio Work: 1. MIRU. 2. MIT - OA 2000 psi for 10 minutes (expect to pass). CMIT TxIA to 2,500 psi for 10 minutes (expect to pass). 3. Pull BPV. Circulate out freeze protection and displace well to seawater. Set a TWC and test to 3500 psi from above and 2000 psi from below(10 minute tests). Nipple down tree. Nipple up and v test BOPE to 3,500psi. Pull TWC. 4. RU and pull the 4-1/2"tubing/kill-string from the pre-rig jet cut at -9600' MD. Test the lower set of pipe rams if necessary. 5. MU a 9-5/8"clean-out assembly on 4"drillpipe to include a casing scraper to-3191' MD in preparation to set a CIBP for the whipstock. (NOTE: With the tubing stub at 9600' MD, PU 4"drillpipe as required to drill to the 7"casing point.) Ptil� 6. RU E-line, run a 9-5/8" EZSV w/GR/CCL for 47#casing. Set the EZSV at-3191' MD. Rig Down E-line. 7. Pressure test the EZSV to 3,500 psi for 30 minutes and chart. 8. PU 9-5/8" whipstock, bottom trip anchor and 8.5"window milling assembly. RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to 9.8 ppg fresh water LSND milling fluid and mill a window in the 9-5/8"casing at-3174' MD (-mid-window) plus 20'-50'of new formation. 9. Perform a LOT/FIT as required. POOH for drilling BHA. - 10. MU an 8-1/2" drilling BHA with DIR/GR/RES/PWD and RIH. Kick off and drill 8-1/2" intermediate rD interval to 7" casing point at the top of the Sag River CBU, wiper trip to shoe, run back to bottom and circulate well clean and POOH. 11. Run and cement a 7",26#, L-80 drilling liner(1000'tail cement job/-150'of liner lap). / isoe Kgvt 5-4449 12. M/U a 6-'/8" DIR/GR/RED drilling assembly. P/U 4"drill pipe as required to TD the well and RIH to top of the float collar and test the casing to 3,500 psi for 30 minutes. J-20C PTD Page 10 8/26/2010 13. Displace the well to 8.5 pf,y Flo-Pro SF fluid. 14. Drill out shoe and 20'of new formation and perform an FIT. 15. Drill build section and land well, per directional proposal. POOH to swap BHA. - 16. MU a 6-1/8" BHA with PDC bit and DIR/GR/RES/NEU/DEN. RIH and drill ahead, per directional proposal and rig site geologist,to TD. 17. CBU at TD. Back ream to shoe, MAD passing as required by geologist. Circulate the well clean at the shoe and POOH. X/4144-5 Ifs t (Vries ?) 18. Run and cement a solid 4-1/2", 12.6#, L-80, IBT-M liner from TD to 150' inside the 7"shoe and set the liner top packer and displace the well to seawater. 19. Test casing/liner to 3500 psi and perforate well on drillpipe(-1000' perfs). ' 20. Run the 4-1/2", 12.6#, 13Cr completion tying into the 4-1/2" liner top. - 21. Displace the well to clean fluids and drop ball & rod and set the production packer and individually test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes each. 22. Shear valve in the upper GLM and confirm circulation. 23. Set and test a TWC to 5000 psi from above and 2000 psi from below. 24. ND BOPE. NU and test the tree to 5,000 psi. 25. Pull TWC. Freeze protect the well to 2000'TVD. 26. Set a BPV. 27. RDMO. Planned Post-Rio Work: 1. Pull BPV. 2. Pull ball and rod/RHC plug. Set generic GLV design. 3. Install wellhouse, instrumentation, and flowlines. (flow-line fabrication WILL be required.) 4. ASRC well test J-20C PTD Page 11 8/26/2010 J-20C Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Intermediate Hole - Given a max cretaceous injection pressure of 9.6 ppg, this wellplan dictates the use of a 9.8 ppg LSND mud from the KOP in the SV sands to the top of the HRZ. From that point to the 8-1/2"TD in the top of the Sag, a 10.4 ppg mud will be used as dictated by the Kingak polar plot. B. Production Hole - The Ivishak in this area is expected to be under-pressured at 6.9 ppg EMW. This interval will be drilled with a reservoir drill-in fluid (FloPro SF) with a fluid density of 8.5-8.8 ppg. II. Lost Circulation/Breathing A. Intermediate Hole - While no major lost circulation is expected in this interval of the well, breathing and/or lost circulation is a possibility due to the shallow KOP on this well which exposes all formations from the SV4 to the TSAG to drilling ECD's associated with the planned 10.4 ppg mud density. B. Production Hole - The planned location is in an area of "Moderate" (i.e. average) risk of lost circulation according to the WURD study. However, the area just to the South is considered "High" risk of lost circulation. The nearest lost significant lost circulation incident to the planned well was -1000 ft North and West in the Q-03A which lost 250 bbls into Zone 2, not associated with a mapped fault. About 3500 ft NW the J-09 and J-09A lost 1200 bbls and 240 bbls respectively into Fault #1. Thus Fault #1 is known to have a significant history of lost circulation. However, it should be noted that the JX-02 and Q-4 also crossed Fault #1, but had no lost circulation problems. Although the J-20C will be near (but not cross) a fault with a known history of lost circulation, it is considered to have low risk of lost circulation. III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 58.6 bbls, and for the production section is infinite. The FIT/LOT will prove up adequate formation strength for expected ECD's. B. Integrity Testing Test Point Test Death 110 EMW(lb/gal) 9-%" window 20-ft minimum from the 9-%" window FIT/LOT 11.1 minimum 7" shoe 20-ft minimum from the 7" shoe FIT/LOT 8.9 minimum IV. Hydrogen Sulfide J-Pad is not considered an H2S site.The highest recorded H2S on the pad was 110 ppm on J-26. V. Faults The J-20C wellpath is not expected to intersect any mapped faults. VI. Anti-Collision Issues There are no anti-collision issues as all off-set wells pass Major Risk analysis. CONSULT THE J-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION J-20C PTD Page 12 8/26/2010 TTY= MCEVOY PERF WELLHEAD= MCEOTI J -2 0 B INTER._ -13410-13510 T W /4-1/2"X 2 BAKER ACTUATOR= OTIS 'KB.E_EV= 70.3' PROD PKRS @ 13309'& 13575'W/2-718"6.4# BF.ELEV= 42.23' TBG IN BETWEEN. 2-7/8"HES CIBP @ 13440' KOP= 800' OPS SHUTDOWN DON2/14/01. Max Angle= 94 @ 13017' Datum MD= 11831' RWO Datum ND= 8800'SS = GAS LIFT MANDRELS 13 3/8"CSG,72#,L 80,m 12.347" -1 2978' ST_ MD ND DEV TYPE VLV LATCH PORT DATE 3 , Minimum ID =2.39" @ 11356' 2 4" BKRLNRTOPPKR 1 - 4-1/2" HES X NIP, ID = 3.813" I 10,626' 7" 26# L-80 scab liner cmt'd 3191`-10792' 9-5/8"X 7"BAKER ZXP PKR 10798' i —) 4-1/2" WLEG 10,7401 W/TEBACK,ID=7.5" IN I: A FISH 10,872' TOP OF 7"LNR -I 10887' II 4-1/2" WRP 10,879' I 9-5/8"CSG,47#,L-80,ID=8.681" 11152' l MILLOUT WINDOW 11678'-11685' I 7"LNR 2 #,L-80,.0383 bpf, ID=6.276" —I 12250' 0..4.1if.4�.1I 11353' J-14"BKR LNR TOP PKR I 11361' —14"BKR DEPLOYMENT SLV,ID=3.0" I 3-1/2"LNR,9.3#,L-80,.0087 bpf,ID=2.992" —I 11628' I I 11628' I—I 3-1/2"X 3-3/16"XO,ID=2.800" I PERFORATION SUMMARY REF LOG: MEMORY CCL/GR/CNL ON 10/17/02 11666' —I TOP OF WHIPSTOCK W/RA TAG I ANGLE AT TOP PERF:88 @ 12100' 1401161 Note:Refer to Production DB for historical pert data 11754' H 3-3/16"X 2-7/8"MILLABLE XO,ID=2.441" I SIZE SPF INTERVAL Opn/Sqz DATE 2" 4 12100-12400 0 10/18/02 2" 4 12600-12900 0 10/18/02 2" 4 13090-13170 0 10/18/02 ••••• ■••••■ \ ••••• '••i•i•i•+ 13185' H PBTD I 4-1/2"LNR, 12.6#,L-80 NSCT,.0152 bpf,ID=3.958" 14140' .****4 •a:. 2-7/8"LNR,6.16#,L-80, .0058 bpf,ID=2.441" 13230' I I 3-3/16"LNR,6.2#,L-80, .0076 bpf,ID=2.800" H 11754' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/28/90 LGM ORIGINAL COMPLETION WELL: J-20B 08/11/96 SIDETRACK(J-20A) PERMIT No: 2021700 10/19/02 JDM/KK CTD SIDETRACK(J-20B) API No: 50-029-21716-02 05/30/09 N4ES RWO OPS SHUTDOWN(J-20B)1 SEC 9,T11 N,R13E, 1215'SNL&802'WEL 06/01/09 PJC DRLG DRAFT UPDATES 03/19/10 SV 7 DRAFT CORRECTION BP Exploration(Alaska) TREE= MCEVOY _ WELLHEAD= MCEVOY J -20B ACTUATOR= OTIS J-20B_ _t Pre-Rig Wells Work: Well left with ' KB.ELEV= 70.3' Seawater and a 2200'of diesel on both sides of BF.ELEV= 42.23' the kill string above the P&A cement plug. KOP= 800' Max Angle= 94 @ 13017' Datum MD= 11831' —13-3/8"Surface Casing cemented to Surface Datum ND= 8800'SS —Estimated TOC in OA-2256'MD 13-3/8"CSG,72#,L-80,ID=12.347" 2978' GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 3 Minimum ID =2.39" @ 11356' 2 4" BKRLNRTOPPKR 1 1 , —Estimated TOC on 9-5/8"casing-5512`MD 4-1/2"Kill String Cut-9600'MD k k"...' — Top P&A Cement Plug-9792'MD 7" 26# L-80 scab liner cmt'd 3191'-10792' a 1 —4-1/2" HES X NIP, ID = 3.813"L10,6261 9-5/8"X 7"BAKER ZXP PKR 10798' l - � e-41/2" WLEG 10,740' W/TI�ACK,ID=7.5" =' jii --FISH I 10,872' III TOP OF 7"LNR 10887 . —4-1/2" WRP 10,8794 1 9-5/8"CSG,47#,L-80,ID=8.681" -1 11152' I 1 MILLOUT WINDOW 11678'- 11685' 7"LNR 26#,L-80, .0383 bpf, ID=6.276" 12250' �.�•�•.• 1�1 1�1 11353' —14"BKR LNR TOP PKR I ■ 11361' —14"BKR DEPLOYMENT SLV,ID=3.0" I 3-1/2"LNR,9.3#,L-80,.0087 bpf,ID=2.992" 11628' 11628' —13-1/2"X 3-3/16"XO,ID=2.800" I PERFORATION SUMMARY REF LOG: MEMORY CCL/GR/CNL ON 10/17/02 11666' H TOP OF WHIPSTOCK W/RA TAG I ANGLE AT TOP PERF:88 @ 12100' 6 Note:Refer to Production DB for historical pert data 11754' I3-3/16"X 2-7/8"MILLABLE XO,ID=2.441" I SIZE SPF INTERVAL Opn/Sqz DATE 2" 4 12100- 12400 0 10/18/02 2" 4 12600- 12900 0 10/18/02 2" 4 13090- 13170 0 10/18/02 ••••• ••••• ►i�i•i•i�• 13185' —113B-FD I 4-1/2"LNR, 12.6#,L-80 NSCT, .0152 bpf,ID=3.958" 14140' 1. 2-7/8"LNR,6.16#,L-80, .0058 bpf,ID=2.441" 13230' 3-3/16"LNR,6.2#,L-80,.0076 bpf, ID=2.800" —I 11754' 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/28/90 LGM ORIGINAL COMPLETION WELL: J-20B 08/11/96 SIDETRACK(J-20A) PERMIT No: 2021700 10/19/02 JDM/KK CTD SIDETRACK(J-20B) API No: 50-029-21716-02 05/30/09 N4ES RWO OPS SHUTDOWN(J-20B) SEC 9,T11 N,R13E, 1215'SNL&802'WEL 06/01/09 PJC DRLG DRAFT UPDATES 03/19/10 SV DRAFT CORRECTION BP Exploration(Alaska) TREE= CIW 4-1/8"5K WELLHEAD= MCEVOY ' -2 0 C , ACTUATOR= KB.ELEV= 67.5 "PROPOSED" BF.ELEV= 39.5 - KOP= 3145 Max Angle= 90 Datum MD= I I 4-1/2"X-Nipple(ID=3.813")2000'MD Datum ND= 8800'SS 4-1/2", 12.6#, 13Cr,VamTop Tubing to 10,390'MD 13-3/8"CSG,72#,L-80, ID=12.347" --{ 2978' Top 7"Liner To at'3016'MD(150'Liner Lap) Minimum ID =3.725" @ xxxx' 9-5/8"x 7"Baker ZXP Pkr-3026'MD 4-1/2" XN Nipple ----------- TOW-3166'MD 9-5/8"CIBP 3191'MD— -.—_ Fully Cemented 7",26#, L-80 Scab Line 3191'- 10,792'MD —4-1/2", 12.6#, 13Cr,VamTop Tubing to 111 10,395' MD(5' Into 4-1/4"Prod Line TBS) 4-1/2"Kill String Cut-9600'MD Top P&A Cement Plug-9879'MD 4-1/2"WLEG 10,740'MD ' I 4-1/2"X-Nipple(ID 3.813")-10,275'MD 9-5/8"X 7"BAKERZXPPKR -I 10798' -7"x 4-1/2"HES TNT Pkr- 10,295'MD 4-1/2"X-Nipple(ID 3.813")-10,325'MD w/rI�ACK,ID=7.5° ; 4-1/2"XN-Nipple(ID 3.725")-10,395'MD "JUNK" 10,872'MD 4-1/2"WRP w/sluggits 10,879'MD 4-1/2"WLEG-10,405' MD Aim\ -7"x4-1/2"Baker Liner Top-10,400'MD TOP OF 7"LNR -I 10887'9-5/8"CSG,47#,L-80,ID=8.681" --I 11152' �7",26#„L-80,VamTop HC Liner to 10,550'MD 7"LNR,26#,L-80,.0383 bpf, ID=6.276" -I 12250' **:. —4-1/2", 12.6#,L-80, IBT-M Liner to J-20 Original Well 12,250'MD 14,290'MD Baker Liner Top Packer 11,353'MD J-20B 3-1/2"x2-7/8""coil"Liner 13,185'MD J-20A RST 4-1/2"Liner at 14,140'MD IIIII rr.-r. PERFORATION SUMMARY \ 40'.•�•-• ■.,.4.4.46_4 REF LOG: MEMORY CCL/GR/CNL ON 10/17/02 ANGLE AT TOP PERF:88 @ 12100' Note:Refer to Production DB for historical perf data GAS LIFT MANDRELS 1 , SIZE SPF ' INTERVAL Opn/Sqz DATE ST MD ND DEV TYPE VLV LATCH PORT DATE 3 2 1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/28/90 LGM ORIGINAL COMPLETION 07/27/10 jgr proposed J-20C RST WELL: J-20C 08/11/96 SIDETRACK(J-20A) PERMIT No: 2021700 • 10/19/02 JDM/KK CTD SIDETRACK(J-20B) API No: 50-029-21716-03 05/30/09 N4ES RWO OPS SHUTDOWN(J-20B) SEC 9,T11 N,R13E, 1215'SNL&802'WEL 06/01/09 PJC DRLG DRAFT UPDATES 03/19/10 SV DRAFT CORRECTION BP Exploration(Alaska) BP - Alaska Prudhoe Bay PB J Pad J-20 -slot 20 Plan J-20C Plan: J-20C Wp 6.0 Standard Proposal Report 11 August, 2010 nil HALLIBURTON Sperry Drilling Services M 1 N I (0 (0 iv 0 0 0 0 N N N - H 7 - 7 - _ WO d M W M M O .-01000m NOMOAN.-MO m,-C 0 In 0 V O p Hf 0 0f mA mA ni.-N W:m,-Q0�- N+ + 1-Zam �M fm O C Q M A pp N Mm N A OA W m .W O Q - A (414.0.. MMM M C CC Cf f Q CQ C00NNN NN + + 00 m 0 0]m 0 0 0 0 0 0 0 0 0 0 0 0 0 M O O M 0 R —1L+00 0 O S O O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g fiiz m H o O'o'1Q'0AO^or0000m0oo.o COONC 2 o m0000000000mom000OOOOOOOO 0 A _ (0 co }IL r y 0666666666666666666666666 00000OOOOOOOOOOOOOOOOOOO O ONQOYf OQOMO`MOMM00000000 0 O 0) N y 0 2_ _ Q ct r 000 0 ccom W 0Q mMMQ QCmN N a U N E O N N < '0m00H.-6+.:600H 6H 6 M0m0' OnM O. •-•-•- ,0_ - -_- 0 -co A 0 Q w . 4NNMM Omommm.s.-m W ,400 2 . O N UC�C Z > .-NMNNNNN 0 _ " 0 O 0 __ _ 0 CO Lo ,-N N 0 `d d d nm W OM W V W W.,0 Mm00.- 0Mf MNN,-NO 0000 C A m.-NMH O N 0 m N M A M 040 CO G N - - M `- O O 0 C mO—OO " Z N NMNO W 0000 N00.-m NN 000,-M M N = O 5.0000 U +InNC�)f n0C W W m OU)N NNN MMMMC1 C 0 C Ta O w M M M C@'II- I)N N O'1 0.?M N N M u?'0 0 6 7 C N \ - 0 O <" O O T,U) O y CMOm.-0000MCNNAMM000000N00 O) •- O n 0 A t000 NN0 66 no fNN 0 2 N O \I I0ACOfl000MNNm .immfN N m M c W 1 . NNN 0004mmn00000000000000000 - In 0 - c Q L W \ ) - NNM(000A 00000 mmmmm mmmmm m m O 0000, N C 0'1)Wmm N N 000000 MM MM M M M n n 0 N ° M U J C d) . , !- 4(M.-o W W,-'-.-�7C.o000 00 - N 0 W ( - 10 N 66-°m 466ni i(�ioi6666l[i66c6Oioioioivioinn (0 CO (n C • • _N MmN NN '110 MMW W MMQQCf10 10 10 10 10 10 10 0M CO O C 0 6 m(7MmC NNNNNNNNNNNNNNN •J @ \� - 5 97 '" uo MOIL In oo Q00000001)0 A OYQ 0 (NO 0 2 0 -0 5�� 1H- 0 C M01-n It)I0 M)0011)100100)00 00 N0nO0 C 2 O) 0 6 '4 2000? 0A N N 04444 O otpf 0000 M 0000 0 co m 1 W • (� LMf N 0) CV'C C M M M N N C C m OO)-m m m CO m 050,n30 CO > - 0 (n • N - p, .-M0) 000f AQ 1)0000(0 W M4N,.-1NOnf OA(CA Si 2 C (1) ID ' I� -) L MMO 200N0Q m m N N N R-0-0 0 666464646 O (-4._ - C 'WC0ON W 0040 mfmM Om W 0 W 66mm(N rn H (1) 0 W - v no W 0 W m00mMMCQ10 W.-(-NMNQN MM M W W W 00000 NNNNN Nf a 0 _1) C ` III _ O O m 0) 0-NMC0 W n Om0•-N(7C - O N 0 (I) • 1 1 11 - (/1�NMQ0)W A... NNNNN CO 7 )C A, 1 1 1 I ) _ I() O) �\ W �) ' I 11 1 11 _A 0 In J �( // / 1 1 1 N Z 40 M 0 J // 1 1 ) 1 1 l - Q• co ,/,,,,,/ 1 /I 1 / 1 1 r 0 Iri c m U \\ III I/I I 1 1 1 = - C O / / I / 1 , 1 1 it O II/I/// 11 I 1 H 0 O 0 1 / i H M 1,() O 0 N /I ./ / 1 J1 J 0 N _to Cl) W ' m Q U' 2 Q U U M 3 Z71 O N 1- H H H co cr)H F' 03 N �- N _N In• Y L N Q m J 0 ,O smi J a L Q L I N 2 cn F N H 0 O N o O ET) Ci 0 2 c c c c Q 0 N C T C>.C>.C C M o M m ,m 000000000 O M ,_ IO0pp 0 0 ....rm.....,... J Q. V . W M0M0�0QnN -I 0 SIgOSMSS o 0 j J Q n m0000000O D m O / w coo0o8O Y 1.-i- 266666666 ° 0; or°mulm v40 O j ca i ? (L V mm 0 ( V / YY Cl ZmoAWvf o=N W W W W W W(o w -1 v- 92 M I C 0 0 J M NN 0 000000 y M 1 .11) > + + 6 _1 to I (0y 0 0N OMNOINN F J O '40 �Z cm D W n 0 r) * .-(,p.50� N N.-H.-H JJ =-4,12 I-M 1[) (I) W Q W N • 51'1 -00 E J T� � C NA .- N�M..�'� (a- o0 W Non)MQO y 0 N.-AN - -_ _.-_..-_ Z QL00 O ZM W NOMN W ON 0 0 r 1`. +m W N 0 0 M O 0 qH ',Dot-)0U W '(±INv(!)10I0N LL(07 �cO▪nN `) j` 'L/V j (� E(m7 J Z M +I' m ♦� m Z O m c C o In In In In N Z o V 4 0 2 LL w >0An An1000 Oni w $W N v a cod z 3.0.0E a 1'IICCO°Wn)mmrnrn0 N 0 .o. w c c (mi8 m 0 _ ,� a U 7(1(5)-6g 2 m ° ct J wo z oNn Z ' C(0 CO E -o.T, K m m mm w Eh• �,« aaia ¢ 2 2c0HWM w °0°S M > 3 ° �o� 5 o O V d V H FQ i m L.F Z O d,' A-(.0N(.0Q d10 • y - L Z N T0) o 0_0 5 LLI-LLI-WI-0i- Q o ;N C N r 0 262 m f 5•0 0 000000000 Z c 200000000 Ti o o °N 0 a` 0 o t�t g o z»»»>- • A In N O I-N W O W 100 N O N co cm co) U U co O N IeoPan a(uj 0 o N. U co 0 2 r m z C R N N a Z y t C t0 N 01/ CI R 2'7//"I a ( v c � 7Na Q `o Eh W C U G .i O� 00 N (.4 ` a: i 0 0 6 2N 2,01-WW _ 0 0 • 0 ao m tf mow ON o3 g 383 In ON 0 0 c0 Lli r m� U G yr,.� O . m V \ / mw`o`�iW F- g (5 ` ` ` r g o0 ot u VJ T7 A A {� N W U m 3 g R 9 _] C ` m A N—a n ' VON S N R W 1 '. i Q _ c� .. . O 3 U' M U r1 6 O G V] V] ,U, I C .M.■ A A ° 0 ^ o\ y - cm - (Jn \y '4 00 Z m C A * o� ' N ` wl vo) y I m . ^ r 3 0 _ C A wo 00 )I , \ O _ + P1 j1 U O N = Ic F A g Zo ,Pr , , \ �Q C N W ' 00 GI. a ,_ ,e, o 0•• N 1 cd O 0 U• n —O A A _°M n ma a o y T - o a N . > ti M M > > 2 2 N v m p H F F F 0 Q o o N N H -, O 0 0) 0) gMm0 Me-OMm mmNtOMOnN Mm O7Qm O 0)«0)...0«o w0 m m.-.-v.-)O V NOi0CV.,CON 0,-eCN.-- N >Q em0 MeOO7,em m�00 mCO/o, > c TaC 00 mmnnvvvvvvVVVVmmmcmm,,,pgg maaaaaa zc*c 0 00000000 f ++ 0 0 0 W 0 0 M 0 M 0 0 0 0 0 0 0 0 0 0 0 M O O en O I pp m 0 m 0 0 0 m V- U O O m O N m 0 O O O O O O O O O O O O O O O O V,m eMO)O a rnr H+pp ) 0OMO.-Q0'-O.-000000moo o oor O m omm,00, goo33 LL m.- 'r n r mw m ' mm O Ili 0,000000000000000000000000 ti 0)00000000 mm j YY -,ONQOQeOQOriciMM M•i 00mm0MOO '�O^� O c OONOoo mm NED W Z mONCOMe m0) y R p00,‘00,1-,, N N m mO�p�mmfp�p m + + 7' p J 3vn Omr 060)666.-6.-60 66,6 c, N V Z m,ONM,mOrn N� 06th m R Wmm Nn(�MR)�.Q-OC.mm,Over Tmwo.-0o + NNNNfJNN 2 3,Or O W NO)NN ' 000 q W L mnM m 06 vi 2 , = __ Z Com m OMme m,N uf7,m OO O -w,m M N Q 9 N N -N«O C U Om m0RNOi N0O)NM m me O J W rvN�N N- � — 7(� ) )O+ N . N E000 F ZN N CN00,00000.- 3 m m M e • t M\O NM M M m n m m m nc Z n 0 Z C M a 0 N N N U +,O41mmmmQmmm0,-N NNN ee 0Q "'-'-'77 N.---, a U mi» W '.“? ?I'rl oTK" 9 m e- NM H O,CC W > 6 C c c a O O ' v u �r a P00 -OO m On O O,O,n tO o` O �a N N 60N W Nlii!.1 �....-. nm NMN 000)0MNNNN NNJ OOm N O N•mrN vv2 O 0 ppm`-‘600 00Ne0 0000000000000 Q,-.-.-0,-0 FW Ac` .- ? m >L m6m N N M666N-0000M Om OO000 MO MOZ 0mNOMNmN Z QQ F +0)m N6m Mmm ZM 6 m fn E aaa m2 3 6 00 O m m m 0 0 0 0 M M M M M M M r W m ci E o n000 M m 0 0 f N vOCNC, ioionci,c6O,60000000p Q -NNN N N oommmoo MM a verv000 o mmmm E N N N N N N N N N N N N N N N'''m O mm7mmmmm N T F Z y CJ J >O r r r r n 0 0 W 0 W ~MO0ooM0 o C 0 W : 6 C 0 ° c O e M M O m m O 0 e e 0 0 0 0 0 0 0 M O n O e Q m 6 r m m 0 0 0 M Z Q N V c 0 N L O O m r M m r r m m m o o m m o m m o 0 0 o N O n o m m m r N N m en m Q Q Q Q O m O O O O M O m 0) E MMM.- o L aO -.Q.-0 °.. Q Q Q Q M MMNNeQ000OW Om0TO0 0 r O 0) 0 rnrno m s>S )e )Z sd a 0 0 ,p O O O Q r e M 0 m m m M m m.-.-m N O n e O r 0 n o 0 0 O LL LL N IN N N 0~0~040 -- J > — I I I I 1 1 'U' p 0 ' LL o 00 e C em0,N()tm0,n o oo.-,OO)v 00,M mO,tm06 mo ue,M N m oU Uo U L I ' I m �= tomo,- n ,D0,Dm eomm, N O N O N O C_=N U M e m m M M M m m m 0,6 0 0 0 e e m m N N N N N N O N 4 N L C O q ] N co m O U ® O`p evmj N N O te,,1-2 O.-NMQmmrm0)O•-'NMa I N�� >rm 000' m.-N M e mmr m0, N NNN N I-N= (110.4oc6)i 0>2V . Sperry Drilling HALLIBUR I DNI Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wel!bore: Plan J-20C Design: J-20C Wp 6.0 Project Prudhoe Bay,North Slope,UNITED STATES Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB J Pad,TR-11-13 Site Position: Northing: 5,968,224.22 ft Latitude: 70°19'14.845 N From: Map Easting: 641,155.79ft Longitude: 148°51'20.092 W Position Uncertainty: 0.011 Slot Radius: 0" Grid Convergence: 1.08 ° Well J-20-Slot 20,J-20 Well Position +NI-S 0.0 ft Northing: 5,970,139.36 ft Latitude: 70°19'33.230 N +E/-W 0.0 ft Easting: 643,559.60 ft Longitude: 148°50'8.881 W Position Uncertainty 0.0 ft Wellhead Elevation: ft Ground Level: 40.9 ft Wellbore Plan J-20C Magnetics Model Name Sample Date Declination Dip Angle Field Strength C) C) (nT) BGGM2009 7/19/2010 22.04 80.94 57,693 Design J-20C Wp 13.0 Audit Notes: Version: Phase: PLAN Tie On Depth: 3,145.0 Vertical Section: Depth From(TVD) +WS +EJ-W Direction (ft) (ft) (ft) r) 26.6 0.0 0.0 191.59 8/11/2010 2:31:27PM Page 2 COMPASS 2003.16 Build 73 Sperry Drilling I-IALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan.1-20C Design: J-20C Wp 6.0 I Plan Sections 1 Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +NI-S +E!-W Rate Rate Rate Tool Face (ft) (°) O (ft) ft (ft) (ft) (°/100ft) (°I100ft) (1100ft) (°) 3,145.0 46.30 121.32 2,863.3 2,795.8 -520.9 846.4 0.00 0.00 0.00 0.00 3,165.0 47.54 124.14 2,877.0 2,809.5 -528.8 858.7 12.00 6.18 14.09 60.00 3,752.4 42.73 156.85 3,296.9 3,229.4 -838.0 1,120.0 4.00 -0.82 5.57 113.09 8,065.7 42.73 156.85 6,465.1 6,397.6 -3,529.3 2,270.6 0.00 0.00 0.00 0.00 8,654.4 35.50 192.86 6,927.5 6,860.0 -3,884.6 2,311.7 4.00 -1.23 6.12 121.28 8,659.3 35.55 193.19 6,931.5 6,864.0 -3,887.4 2,311.0 4.00 1.05 6.64 74.89 9,669.8 35.55 193.19 7,753.6 7,686.1 -4,459.4 2,176.9 0.00 0.00 0.00 0.00 9,962.8 24.00 189.15 8,007.5 7,940.0 -4,601.6 2,147.9 4.00 -3.94 -1.38 -171.88 10,612.8 24.00 189.15 8,601.3 8,533.8 -4,862.7 2,105.9 0.00 0.00 0.00 0.00 10,852.8 44.54 233.45 8,801.4 8,733.9 -4,963.5 2,028.6 13.00 8.56 18.46 71.00 10,991.3 44.54 233.45 8,900.2 8.832.7 -5,021.3 1,950.6 0.00 0.00 0.00 0.00 11,349.8 90.00 245.00 9,035.5 8,968.0 -5,180.9 1,671.5 13.00 12.68 3.22 16.00 11,399.8 96.50 245.00 9,032.7 8,965.2 -5,202.0 1,626.3 13.00 13.00 0.00 0.00 11,438.1 96.50 245.00 9,028.3 8.960.8 -5,218.0 1,591.8 0.00 0.00 0.00 0.00 11,488.1 90.00 245.00 9,025.5 8,958.0 -5,239.1 1,546.6 13.00 -13.00 0.00 180.00 11,596.8 90.00 259.13 9,025.5 8,958.0 -5,272.5 1,443.4 13.00 0.00 13.00 90.00 11,866.2 90.00 259.13 9,025.5 8,958.0 -5,323.3 1,178.9 0.00 0.00 0.00 0.00 12,100.0 90.00 259.13 9,025.5 8.958.0 -5,367.4 949.3 0.00 0.00 0.00 0.00 12,184.7 83.23 259.13 9,030.5 8,963.0 -5,383.3 866.3 8.00 -8.00 0.00 180.00 12,269.4 90.00 259.13 9,035.5 8,968.0 -5,399.2 783.4 8.00 8.00 0.00 -0.03 12,354.0 96.77 259.13 9,030.5 8,963.0 -5,415.2 700.4 8.00 8.00 0.00 0.00 12,438.7 90.00 259.13 9,025.5 8.958.0 -5,431.1 617.4 8.00 -8.00 0.00 180.00 12,454.6 89.84 257.87 9,025.5 8,958.0 -5,434.2 601.9 8.00 -0.98 -7.94 -97.03 14,290.7 89.84 257.87 9,030.5 8,963.0 -5,820.0 -1,193.2 0.00 0.00 0.00 0.00 8/11/2010 2:31:27PM Page 3 COMPASS 2003.16 Build 73 Sperry Drilling H A L L I B U R T O R) Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Wet J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GLIMSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GLIMSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 2,795.82 3,145.0 46.30 121.32 2,863.3 2,795.8 -520.9 846.4 5,969,634.75 644,415.71 0.00 340.34 KOP Start DLS 12.00 TFO 60.00 RT TF 3,165.0 47.54 124.14 2,877.0 2,809.5 -528.8 858.7 5,969,627.08 644,428.14 12.00 345.61 Start DLS 4.00 3165.0'MD 3,200.0 47.00 125.90 2,900.7 2,833.2 -543.6 879.7 5,969,612.74 644,449.47 4.00 355.83 3,300.0 45.62 131.09 2,969.8 2,902.3 -588.5 936.3 5,969,568.88 644,506.90 4.00 388.50 3,400.0 44.49 136.52 3,040.5 2,973.0 -637.5 987.4 5,969,520.94 644,558.89 4.00 426.18 3,500.0 43.63 142.13 3,112.4 3,044.9 -690.2 1,032.7 5,969,469.14 644,605.19 4.00 468.69 3,581.3 43.13 146.82 3,171.5 3,104.0 -735.6 1,065.1 5,969,424.34 644,638.50 4.00 506.67 SV3 3,600.0 43.05 147.90 3,185.1 3,117.6 -746.3 1,072.0 5,969,413.73 644,645.58 4.00 515.82 3,700.0 42.76 153.76 3,258.4 3,190.9 -805.7 1,105.1 5,969,354.99 644,679.87 4.00 567.34 3,752.4 42.73 156.85 3,296.9 3,229.4 -838.0 1,120.0 5,969,322.99 644,695.33 4.00 596.00 End Directional 3752.4'MD 3,769.5 42.73 156.85 3,309.5 3,242.0 -848.7 1,124.6 5,969,312.37 644,700.12 0.00 605.56 SV2 3,800.0 42.73 156.85 3,331.9 3,264.4 -867.7 1,132.7 5,969,293.53 644,708.60 0.00 622.55 3,900.0 42.73 156.85 3,405.3 3,337.8 -930.1 1,159.4 5,969,231.66 644,736.46 0.00 678.31 4,000.0 42.73 156.85 3,478.8 3,411.3 -992.5 1,186.1 5,969,169.79 644,764.33 0.00 734.08 4,100.0 42.73 156.85 3,552.2 3,484.7 -1,054.9 1,212.7 5,969,107.93 644,792.19 0.00 789.84 4,200.0 42.73 156.85 3,625.7 3,558.2 -1,117.3 1,239.4 5,969,046.06 644,820.05 0.00 845.61 4,291.0 42.73 156.85 3,692.5 3,625.0 -1,174.1 1,263.7 5,968,989.78 644,845.40 0.00 896.34 SV1 4,300.0 42.73 156.85 3,699.1 3,631.6 -1,179.7 1,266.1 5,968,984.19 644,847.92 0.00 901.37 4,400.0 42.73 156.85 3,772.6 3,705.1 -1,242.1 1,292.8 5,968,922.32 644,875.78 0.00 957.14 4,500.0 42.73 156.85 3,846.0 3,778.5 -1,304.5 1,319.4 5,968,860.46 644,903.64 0.00 1,012.90 4,600.0 42.73 156.85 3,919.5 3,852.0 -1,366.9 1,346.1 5,968,798.59 644,931.51 0.00 1,068.67 4,700.0 42.73 156.85 3,992.9 3,925.4 -1,429.3 1,372.8 5,968,736.72 644,959.37 0.00 1,124.43 4,787.9 42.73 156.85 4,057.5 3,990.0 -1,484.1 1,396.2 5,968,682.34 644,983.86 0.00 1,173.45 UG4 4,800.0 42.73 156.85 4,066.4 3,998.9 -1,491.7 1,399.5 5,968,674.85 644,987.23 0.00 1,180.20 4,900.0 42.73 156.85 4,139.8 4,072.3 -1,554.1 1,426.1 5,968,612.98 645,015.10 0.00 1,235.96 5,000.0 42.73 156.85 4,213.3 4,145.8 -1,616.5 1,452.8 5,968,551.12 645,042.96 0.00 1,291.73 5,100.0 42.73 156.85 4,286.8 4,219.3 -1,678.9 1,479.5 5,968,489.25 645,070.82 0.00 1,347.49 5,182.7 42.73 156.85 4,347.5 4,280.0 -1,730.5 1,501.6 5,968,438.08 645,093.87 0.00 1,393.61 UG3 5,200.0 42.73 156.85 4,360.2 4,292.7 -1,741.2 1,506.2 5,968,427.38 645,098.69 0.00 1,403.26 5,300.0 42.73 156.85 4,433.7 4,366.2 -1,803.6 1,532.8 5,968,365.51 645,126.55 0.00 1,459.02 5,400.0 42.73 156.85 4,507.1 4,439.6 -1,866.0 1,559.5 5,968,303.64 645,154.41 0.00 1,514.79 5,500.0 42.73 156.85 4,580.6 4,513.1 -1,928.4 1,586.2 5,968,241.78 645,182.28 0.00 1,570.55 5,600.0 42.73 156.85 4,654.0 4,586.5 -1,990.8 1,612.9 5,968,179.91 645,210.14 0.00 1,626.32 5,700.0 42.73 156.85 4,727.5 4,660.0 -2,053.2 1,639.6 5,968,118.04 645,238.00 0.00 1,682.08 5,800.0 42.73 156.85 4,800.9 4,733.4 -2,115.6 1,666.2 5,968,056.17 645,265.87 0.00 1,737.85 5,900.0 42.73 156.85 4,874.4 4,806.9 -2,178.0 1,692.9 5,967,994.30 645,293.73 0.00 1,793.61 6,000.0 42.73 156.85 4,947.8 4,880.3 -2,240.4 1,719.6 5,967,932.44 645,321.59 0.00 1,849.38 8/11/2010 2:31:27PM Page 4 COMPASS 2003.16 Build 73 Sperry Drilling ' I-IALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) C) C) (ft) ft (ft) (ft) (ft) (ft) 4,953.78 6,100.0 42.73 156.85 5,021.3 4,953.8 -2,302.8 1,746.3 5,967,870.57 645,349.46 0.00 1,905.14 6,200.0 42.73 156.85 5,094.7 5,027.2 -2,365.2 1,772.9 5,967,808.70 645,377.32 0.00 1,960.91 6,300.0 42.73 156.85 5,168.2 5,100.7 -2,427.6 1,799.6 5,967,746.83 645,405.18 0.00 2,016.67 6,400.0 42.73 156.85 5,241.6 5,174.1 -2,490.0 1,826.3 5,967,684.97 645,433.05 0.00 2,072.44 6,500.0 42.73 156.85 5,315.1 5,247.6 -2,552.4 1,853.0 5,967,623.10 645,460.91 0.00 2,128.20 6,583.6 42.73 156.85 5,376.5 5,309.0 -2,604.5 1,875.3 5,967,571.37 645,484.21 0.00 2,174.83 WS2 6,600.0 42.73 156.85 5,388.5 5,321.0 -2,614.8 1,879.6 5,967,561.23 645,488.77 0.00 2,183.97 [ 6,700.0 42.73 156.85 5,462.0 5,394.5 -2,677.2 1,906.3 5,967,499.36 645,516.64 0.00 2,239.73 6,800.0 42.73 156.85 5,535.4 5,467.9 -2,739.6 1,933.0 5,967,437.49 645,544.50 0.00 2,295.50 6,876.3 42.73 156.85 5,591.5 5,524.0 -2,787.2 1,953.4 5,967,390.28 645,565.76 0.00 2,338.06 WS1 6,900.0 42.73 156.85 5,608.9 5,541.4 -2,802.0 1,959.7 5,967,375.63 645,572.36 0.00 2,351.26 7,000.0 42.73 156.85 5,682.4 5,614.9 -2,864.3 1,986.4 5,967,313.76 645,600.23 0.00 2,407.03 7,100.0 42.73 156.85 5,755.8 5,688.3 -2,926.7 2,013.0 5,967,251.89 645,628.09 0.00 2,462.79 7,125.5 42.73 156.85 5,774.5 5,707.0 -2,942.6 2,019.8 5,967,236.14 645,635.18 0.00 2,476.99 CM3 7,200.0 42.73 156.85 5,829.3 5,761.8 -2,989.1 2,039.7 5,967,190.02 645,655.95 0.00 2,518.56 7,300.0 42.73 156.85 5,902.7 5,835.2 -3,051.5 2,066.4 5,967,128.15 645,683.82 0.00 2,574.32 7,400.0 42.73 156.85 5,976.2 5,908.7 -3,113.9 2,093.1 5,967,066.29 645,711.68 0.00 2,630.09 7,500.0 42.73 156.85 6,049.6 5,982.1 -3,176.3 2,119.7 5,967,004.42 645,739.54 0.00 2,685.86 7,600.0 42.73 156.85 6,123.1 6,055.6 -3,238.7 2,146.4 5,966,942.55 645,767.41 0.00 2,741.62 7,700.0 42.73 156.85 6,196.5 6,129.0 -3,301.1 2,173.1 5,966,880.68 645,795.27 0.00 2,797.39 7,800.0 42.73 156.85 6,270.0 6,202.5 -3,363.5 2,199.8 5,966,818.81 645,823.13 0.00 2,853.15 7,900.0 42.73 156.85 6,343.4 6,275.9 -3,425.9 2,226.4 5,966,756.95 645,851.00 0.00 2,908.92 8,000.0 42.73 156.85 6,416.9 6,349.4 -3,488.3 2,253.1 5,966,695.08 645,878.86 0.00 2,964.68 8,065.7 42.73 156.85 6,465.1 6,397.6 -3,529.3 2,270.6 5,966,654.42 645,897.17 0.00 3,001.32 Start DLS 4.00 3065.7'MD 8,100.0 42.03 158.60 6,490.5 6,423.0 -3,550.7 2,279.4 5,966,633.21 645,906.34 4.00 3,020.52 8,200.0 40.16 163.98 6,565.9 6,498.4 -3,612.9 2,300.5 5,966,571.44 645,928.65 4.00 3,077.19 8,300.0 38.55 169.76 6,643.2 6,575.7 -3,674.5 2,315.0 5,966,510.06 645,944.27 4.00 3,134.71 8,400.0 37.24 175.91 6,722.1 6,654.6 -3,735.4 2,322.7 5,966,449.35 645,953.13 4.00 3,192.79 8,500.0 36.27 182.40 6,802.3 6,734.8 -3,795.2 2,323.6 5,966,389.63 645,955.19 4.00 3,251.15 8,600.0 35.67 189.14 6,883.3 6,815.8 -3,853.5 2,317.7 5,966,331.17 645,950.44 4.00 3,309.51 8,654.4 35.50 192.86 6,927.5 6,860.0 -3,884.6 2,311.7 5,966,300.00 645,945.00 4.00 3,341.14 J-20C TI rev 3 8,659.3 35.55 193.19 6,931.5 6,864.0 -3,887.4 2,311.0 5,966,297.21 645,944.41 4.00 3,343.99 End Directional 8659.3'MD 8,700.0 35.55 193.19 6,964.6 6,897.1 -3,910.4 2,305.6 5,966,274.07 645,939.45 0.00 3,367.65 8,715.8 35.55 193.19 6,977.5 6,910.0 -3,919.4 2,303.5 5,966,265.06 645,937.52 0.00 3,376.86 THRZ 8,800.0 35.55 193.19 7,046.0 6,978.5 -3,967.0 2,292.4 5,966,217.22 645,927.27 0.00 3,425.77 8,900.0 35.55 193.19 7,127.3 7,059.8 -4,023.6 2,279.1 5,966,160.38 645,915.08 0.00 3,483.89 9,000.0 35.55 193.19 7,208.7 7,141.2 -4,080.2 2,265.8 5,966,103.53 645,902.90 0.00 3,542.01 8/11/2010 2:31:27PM Page 5 COMPASS 2003.16 Build 73 Sperry Drilling I-IALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (*) C) (ft) ft (ft) (ft) (ft) (ft) 7,160.00 9,023.1 35.55 193.19 7,227.5 7,160.0 -4,093.3 2,262.8 5,966,090.38 645,900.08 0.00 3,555.46 BHRZ 9,047.7 35.55 193.19 7,247.5 7,180.0 -4,107.2 2,259.5 5,966,076.40 645,897.08 0.00 3,569.74 LCU/Top Kingak 9,100.0 35.55 193.19 7,290.0 7,222.5 -4,136.8 2,252.6 5,966,046.68 645,890.71 0.00 3,600.13 9,200.0 35.55 193.19 7,371.4 7,303.9 -4,193.5 2,239.3 5,965,989.83 645,878.53 0.00 3,658.26 9,300.0 35.55 193.19 7,452.8 7,385.3 -4,250.1 2,226.0 5,965,932.98 645,866.34 0.00 3,716.38 9,400.0 35.55 193.19 7,534.1 7,466.6 -4,306.7 2,212.7 5,965,876.13 645,854.16 0.00 3,774.50 9,500.0 35.55 193.19 7,615.5 7,548.0 -4,363.3 2,199.5 5,965,819.28 645,841.97 0.00 3,832.62 9,600.0 35.55 193.19 7,696.8 7,629.3 -4,419.9 2,186.2 5,965,762.44 645,829.79 0.00 3,890.74 9,669.8 35.55 193.19 7,753.6 7,686.1 -4,459.4 2,176.9 5,965,722.75 645,821.29 0.00 3,931.31 Start DLS 4.00 9669.8'MD 9,700.0 34.36 192.89 7,778.4 7,710.9 -4,476.3 2,173.0 5,965,705.83 645,817.70 4.00 3,948.61 9,800.0 30.40 191.74 7,862.8 7,795.3 -4,528.6 2,161.6 5,965,653.32 645,807.26 4.00 4,002.14 9,900.0 26.46 190.29 7,950.7 7,883.2 -4,575.3 2,152.5 5,965,606.44 645,799.02 4.00 4,049.74 9,962.8 24.00 189.15 8,007.5 7,940.0 -4,601.6 2,147.9 5,965,580.00 645,795.00 4.00 4,076.48 End Directional 9962.8'MD-J-20C T2 rev 3 10,000.0 24.00 189.15 8,041.5 7,974.0 -4,616.6 2,145.5 5,965,565.00 645,792.88 0.00 4,091.61 10,100.0 24.00 189.15 8,132.9 8,065.4 4,656.8 2,139.1 5,965,524.73 645,787.18 0.00 4,132.25 10,200.0 24.00 189.15 8,224.2 8,156.7 -4,696.9 2,132.6 5,965,484.46 645,781.48 0.00 4,172.88 10,300.0 24.00 189.15 8,315.6 8,248.1 -4,737.1 2,126.1 5,965,444.20 645,775.78 0.00 4,213.52 10,348.1 24.00 189.15 8,359.5 8,292.0 -4,756.4 2,123.0 5,965,424.84 645,773.04 0.00 4,233.05 TJB 10,400.0 24.00 189.15 8,406.9 8,339.4 -4,777.2 2,119.6 5,965,403.93 645,770.09 0.00 4,254.16 10,417.0 24.00 189.15 8,422.5 8,355.0 4,784.1 2,118.5 5,965,397.07 645,769.12 0.00 4,261.08 TJA 10,500.0 24.00 189.15 8,498.3 8,430.8 4,817.4 2,113.2 5,965,363.66 645,764.39 0.00 4,294.79 10,532.0 24.00 189.15 8,527.5 8,460.0 4,830.2 2,111.1 5,965,350.78 645,762.57 0.00 4,307.79 TSGR 10,549.7 24.00 189.15 8,543.7 8,476.2 -4,837.3 2,110.0 5,965,343.64 645,761.56 0.00 4,314.99 7" 10,571.4 24.00 189.15 8,563.5 8,496.0 4,846.0 2,108.6 5,965,334.91 645,760.32 0.00 4,323.80 TSHU 10,600.0 24.00 189.15 8,589.6 8,522.1 4,857.5 2,106.7 5,965,323.39 645,758.69 0.00 4,335.43 10,612.8 24.00 189.15 8,601.3 8,533.8 4,862.7 2,105.9 5,965,318.23 645,757.96 0.00 4,340.63 Start DLS 13.00 10612.8'MD 10,658.3 26.49 201.77 8,642.5 8,575.0 4,881.2 2,100.6 5,965,299.57 645,753.08 13.01 4,359.87 TSAD 10,700.0 29.58 211.28 8,679.3 8,611.8 4,898.7 2,091.8 5,965,281.95 645,744.61 13.00 4,378.74 10,800.0 38.94 227.47 8,762.1 8,694.6 4,941.2 2,055.7 5,965,238.75 645,709.30 13.00 4,427.65 10,852.8 44.54 233.45 8,801.5 8,734.0 4,963.5 2,028.6 5,965,215.96 645,682.60 12.99 4,454.92 End Directional 10852.8'MD 10,862.7 44.54 233.45 8,808.5 8,741.0 4,967.6 2,023.0 5,965,211.74 645,677.12 0.00 4,460.07 TCGL 10,900.0 44.54 233.45 8,835.1 8,767.6 -4,983.2 2,002.0 5,965,195.74 645,656.39 0.00 4,479.58 8/11/2010 2:31:27PM Page 6 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Project Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (1 (ft) ft (ft) (ft) (ft) (ft) 8,816.00 10,967.9 44.54 233.45 8,883.5 8,816.0 -5,011.6 1,963.7 5,965,166.66 645,618.70 0.00 4,515.03 BCGL 10,991.3 44.54 233.45 8,900.2 8,832.7 -5,021.3 1,950.5 5,965,156.63 645,605.70 0.00 4,527.27 Start DLS 13.00 10991.3'MD 11,000.0 45.63 233.88 8,906.3 8,838.8 -5,025.0 1,945.6 5,965,152.89 645,600.81 13.06 4,531.84 11,077.4 55.36 237.17 8,955.5 8,888.0 -5,058.6 1,896.4 5,965,118.32 645,552.26 13.00 4,574.67 23SB 11,099.2 58.13 237.96 8,967.5 8,900.0 -5,068.4 1,880.9 5,965,108.22 645,537.00 13.00 4,587.38 PGOC 11,100.0 58.22 237.99 8,967.9 8,900.4 -5,068.8 1,880.4 5,965,107.87 645,536.47 13.00 4,587.83 11,176.5 67.92 240.42 9,002.5 8,935.0 -5,103.6 1,821.9 5,965,071.94 645,478.61 13.00 4,633.69 22TS 11,200.0 70.91 241.09 9,010.8 8,943.3 -5,114.4 1,802.7 5,965,060.82 645,459.62 13.00 4,648.08 11,241.5 76.19 242.22 9,022.5 8,955.0 -5,133.2 1,767.7 5,965,041.29 645,425.01 13.00 4,673.59 HOT 11,300.0 83.65 243.74 9,032.7 8,965.2 -5,159.4 1,716.4 5,965,014.16 645,374.21 13.00 4,709.52 11,349.8 90.00 245.00 9,035.5 8,968.0 -5,180.9 1,671.5 5,964,991.81 645,329.80 13.00 4,739.58 11,399.8 96.50 245.00 9,032.7 8,965.2 -5,202.0 1,626.3 5,964,969.87 645,285.02 13.00 4,769.31 End Directional 11399.8'MD 11,400.0 96.50 245.00 9,032.6 8,965.1 -5,202.0 1,626.1 5,964,969.79 645,284.84 1.38 4,769.43 11,438.1 96.50 245.00 9,028.3 8,960.8 -5,218.0 1,591.8 5,964,953.14 645,250.85 0.00 4,791.99 Start OLS 13.00 11438.1'MD 11,488.1 90.00 245.00 9,025.5 8,958.0 -5,239.1 1,546.6 5,964,931.19 645,206.05 13.00 4,821.73 11,500.0 90.00 246.55 9,025.5 8,958.0 -5,244.0 1,535.8 5,964,926.10 645,195.29 13.00 4,828.69 11,596.8 90.00 259.13 9,025.5 8,958.0 -5,272.5 1,443.5 5,964,895.84 645,103.55 13.00 4,875.15 End Directional 11596.8'MO 11,600.0 90.00 259.13 9,025.5 8,958.0 -5,273.1 1,440.3 5,964,895.18 645,100.42 0.08 4,876.38 11,700.0 90.00 259.13 9,025.5 8,958.0 -5,292.0 1,342.1 5,964,874.45 645,002.60 0.00 4,914.57 11,800.0 90.00 259.13 9,025.5 8,958.0 -5,310.8 1,243.9 5,964,853.73 644,904.78 0.00 4,952.76 11,866.2 90.00 259.13 9,025.5 8,958.0 -5,323.3 1,178.9 5,964,840.00 644,840.00 0.00 4,978.05 J-20C T4 11,900.0 90.00 259.13 9,025.5 8,958.0 -5,329.7 1,145.7 5,964,833.00 644,806.96 0.00 4,990.95 12,000.0 90.00 259.13 9,025.5 8,958.0 -5,348.5 1,047.5 5,964,812.27 644,709.14 0.00 5,029.14 12,100.0 90.00 259.13 9,025.5 8,958.0 -5,367.4 949.3 5,964,791.55 644,611.32 0.00 5,067.33 Start DLS 8.00 12100.0'MD 12,184.7 83.23 259.13 9,030.5 8,963.0 -5,383.3 866.3 5,964,774.04 644,528.68 8.00 5,099.60 12,200.0 84.45 259.13 9,032.1 8,964.6 -5,386.2 851.4 5,964,770.88 644,513.78 8.00 5,105.42 12,269.4 90.00 259.13 9,035.5 8,968.0 -5,399.2 783.4 5,964,756.53 644,446.04 8.00 5,131.86 12,300.0 92.45 259.13 9,034.8 8,967.3 -5,405.0 753.3 5,964,750.18 644,416.07 8.00 5,143.57 12,354.0 96.77 259.13 9,030.5 8,963.0 -5,415.2 700.4 5,964,739.02 644,363.40 8.00 5,164.13 12,400.0 93.10 259.13 9,026.5 8,959.0 -5,423.8 655.4 5,964,729.52 644,318.61 8.00 5,181.62 12,438.7 90.00 259.13 9,025.5 8,958.0 -5,431.1 617.4 5,964,721.50 644,280.77 8.00 5,196.40 12,454.6 89.84 257.87 9,025.5 8,958.0 -5,434.3 601.9 5,964,718.04 644,265.26 7.98 5,202.64 End Directional 12454.6'MD ' 12,500.0 89.84 257.87 9,025.6 8,958.1 -5,443.8 557.5 5,964,707.65 644,221.07 0.00 5,220.89 L 8/11/2010 2:31:27PM Page 7 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GLIMSL+28'KB) Project Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wel!bore: Plan J-20C Design: J-20C Wp 6.0 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E/-W Northing Easting DLS Vert Section (ft) (°) (`) (ft) ft (ft) (ft) (ft) (ft) 8,958.42 12,600.0 89.84 257.87 9,025.9 8,958.4 -5,464.8 459.7 5,964,684.77 644,123.73 0.00 5,261.11 12,700.0 89.84 257.87 9,026.2 8,958.7 -5,485.8 361.9 5,964,661.90 644,026.39 0.00 5,301.33 12,800.0 89.84 257.87 9,026.5 8,959.0 -5,506.8 264.2 5,964,639.02 643,929.05 0.00 5,341.55 12,900.0 89.84 257.87 9,026.7 8,959.2 -5,527.8 166.4 5,964,616.14 643,831.71 0.00 5,381.77 13,000.0 89.84 257.87 9,027.0 8,959.5 -5,548.8 68.6 5,964,593.27 643,734.37 0.00 5,421.99 13,100.0 89.84 257.87 9,027.3 8,959.8 -5,569.9 -29.1 5,964,570.39 643,637.03 0.00 5,462.21 13,200.0 89.84 257.87 9,027.5 8,960.0 -5,590.9 -126.9 5,964,547.51 643,539.69 0.00 5,502.43 13,300.0 89.84 257.87 9,027.8 8,960.3 -5,611.9 -224.7 5,964,524.64 643,442.35 0.00 5,542.65 13,400.0 89.84 257.87 9,028.1 8,960.6 -5,632.9 -322.4 5,964,501.76 643,345.01 0.00 5,582.87 13,500.0 89.84 257.87 9,028.4 8,960.9 -5,653.9 -420.2 5,964,478.88 643,247.67 0.00 5,623.09 13,600.0 89.84 257.87 9,028.6 8,961.1 -5,674.9 -518.0 5,964,456.01 643,150.33 0.00 5,663.31 13,700.0 89.84 257.87 9,028.9 8,961.4 -5,695.9 -615.7 5,964,433.13 643,052.99 0.00 5,7'03.53 13,800.0 89.84 257.87 9,029.2 8,961.7 -5,716.9 -713.5 5,964,410.25 642,955.65 0.00 5,743.75 13,900.0 89.84 257.87 9,029.4 8,961.9 -5,738.0 -811.3 5,964,387.38 642,858.31 0.00 5,783.97 14,000.0 89.84 257.87 9,029.7 8,962.2 -5,759.0 -909.0 5,964,364.50 642,760.97 0.00 5,824.19 14,100.0 89.84 257.87 9,030.0 8,962.5 -5,780.0 -1,006.8 5,964,341.63 642,663.63 0.00 5,864.41 14,200.0 89.84 257.87 9,030.3 8,962.8 -5,801.0 -1,104.6 5,964,318.75 642,566.29 0.00 5,904.63 14,290.7 89.84 257.87 9,030.5 8,963.0 -5,820.0 -1,193.2 5,964,298.00 642,478.00 0.00 5,941.11 J-20C 75 8/11/2010 2:31:27PM Page 8 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Project: Prudhoe Bay MD Reference: 13-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: 3-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape C) C) (ft) (ft) (ft) (ft) (ft) J-20C F? 0.00 0.00 8,567.5 -3,531.5 1,373.2 5,966,635.00 645,000.00 -plan misses target center by 1428.8ft at 10094.711 MD(8128.1 TVD,-4654.6 N,2139.4 E) -Polygon ` Point 1 8,567.5 -3,531.5 1,373.2 5,966,635.00 645,000.00 I Point 2 8,567.5 -5,016.1 2,900.2 5,965,180.00 646,555.01 J-20C3 i rev- 0.00 0.00 6,927.5 -3,884.6 2,311.7 5,966,300.00 645,945.00 -plan hits target center -Pant J-20C 0.00 0.00 9,030.5 -5,820.0 -1,193.2 5,964,298.00 642,478.00 -plan hits target center -Point J-20C 0.00 0.00 7,987.5 -2,221.2 328.0 5,967,925.00 643,930.00 -plan misses target center by 2784.9ft at 7849.5ft MD(6306.3 TVD,-3394.4 N,2213.0 E) -Polygon Point 1 7,987.5 -2,221.2 328.0 5,967,925.00 643,930.00 Point 2 7,987.5 -2,963.3 1,214.0 5,967,200.04 644,829.97 Point 3 7,987.5 -3,878.0 1,966.7 5,966,299.98 645,599.97 Point 4 7,987.5 -4,418.6 2,776.6 5,965,775.01 646,420.00 Point 5 7,987.5 -4,899.5 3,077.5 5,965,300.00 646,730.02 Point 6 7,987.5 -4,418.6 2,776.6 5,965,775.01 646,420.00 Point 7 7,987.5 -3,878.0 1,966.7 5,966,299.98 645,599.97 Point 8 7,987.5 -2,963.3 1,214.0 5,967,200.04 644,829.97 J-20C Gee 0.00 0.00 9,030.5 -5,661.4 -1,278.2 5,964,455.00 642,390.00 -plan misses target center by 180.0ft at 14290.711 MD(9030.5 TVD,-5820.0 N,-1193.2 E) -Polygon Point 1 9,030.5 -5,661.4 -1,278.2 5,964,455.00 642,390.00 Point2 9,030.5 -6,082.6 -1,221.2 5,964,035.00 642,455.04 Point 3 9,030.5 -5,888.7 407.9 5,964,260.02 644,080.01 Point 4 9,030.5 -5,229.7 2,035.9 5,964,949.99 645,694.98 Point 5 9,030.5 -4,976.8 2,410.9 5,965,210.00 646,065.05 Point6 9,030.5 -4,672.8 1,946.5 5,965,505.03 645,594.95 Point 7 9,030.5 -5,112.6 1,142.9 5,965,049.98 644,799.97 J-20C 1- 0.00 0.00 9,025.5 -5,323.3 1,178.9 5,964,840.00 644,840.00 -plan hits target center -Point J-20C T2 re, 0.00 0.00 8,007.5 -4,601.6 2,147.9 5,965,580.00 645,795.00 -plan hits target center -Point J-20C Fault 3 0.00 0.00 6,920.5 -991.0 71.5 5,969,150.00 643,650.00 -plan misses target center by 2848.9ft at 6229.8ft MD(5116.6 TVD,-2383.8 N,1780.9 E) -Polygon Point 1 6,920.5 -991.0 71.5 5,969,150.00 643,650.00 Point 2 6,920.5 -2,417.7 2,494.8 5,967,770.03 646,099.96 Point 3 6,920.5 -3,934.2 4,121.2 5,966,285.04 647,754.95 Point 4 6,920.5 -2,417.7 2,494.8 5,967,770.03 646,099.96 8/11/2010 2:31:27PM Page 9 COMPASS 2003.16 Build 73 Sperry Drilling HALLIBURTON Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GUMSL+28'KB) Project Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Welibore: Plan J-20C Design: J-20C Wp 6.0 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (") (") 2,975.2 2,743.4 13 3/8" 13-3/8 17-1/2 10,549.7 8,538.0 7" 7 7-1/2 14,315.5 4 1/2" 5-1/2 6 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (") (°) 4,787.9 4,057.5 UG4 2,948.9 2,724.5 SV4 10,577.7 8,563.5 TSHU 10,658.3 8,642.5 TSAD 10,967.9 8,883.5 BCGL 3,581.3 3,171.5 SV3 4,291.0 3,692.5 SV1 10,422.9 8,422.5 TJA 3,769.5 3,309.5 SV2 5,182.7 4,347.5 UG3 11,077.4 8,955.5 23SB 3,143.8 2,862.5 KOP 11,176.5 9,002.5 22TS 6,876.3 5,591.5 WS1 11,241.5 9,022.5 HOT 9,023.1 7,227.5 BHRZ 9,047.7 7,247.5 LCU/Top Kingak 10,862.7 8,808.5 TCGL 11,099.2 8,967.5 PGOC 10,538.2 8,527.5 TSGR 10,353.5 8,359.5 TJB 7,125.5 5,774.5 CM3 8,715.8 6,977.5 THRZ 6,583.6 5,376.5 WS2 8/11/2010 2:31:27PM Page 10 COMPASS 2003.16 Build 73 Sperry Drilling H A LL I B U R TO N Standard Proposal Report Database: .Sperry EDM.16 PRD Local Co-ordinate Reference: Well J-20-Slot 20 Company: BP-Alaska TVD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Project: Prudhoe Bay MD Reference: D-141 @ 67.5ft(39.5'GL/MSL+28'KB) Site: PB J Pad North Reference: True Well: J-20 Survey Calculation Method: Minimum Curvature Wellbore: Plan J-20C Design: J-20C Wp 6.0 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/S +E/-W (ft) (ft) (ft) (ft) Comment 3,145.0 2,863.3 -520.9 846.4 KOP Start DLS 12.00 TFO 60.00 RT TF 3,165.0 2,877.0 -528.8 858.7 Start DLS 4.00 3165.0'MD 3,752.4 3,296.9 -838.0 1,120.0 End Directional 3752.4'MD I 8,065.7 6,465.1 -3,529.3 2,270.6 Start DLS 4.00 8065.7'MD 8,659.3 6,931.5 -3,887.4 2,311.0 End Directional 8659.3'MD 9,669.8 7,753.6 -4,459.4 2,176.9 Start DLS 4.00 9669.8'MD 9,962.8 8,007.5 -4,601.7 2,147.9 End Directional 9962.8'MD 10,612.8 8,601.3 -4,862.7 2,105.9 Start DLS 13.00 10612.8'MD 10,852.8 8,801.5 -4,963.5 2,028.6 End Directional 10852.8'MD 10,991.3 8,900.2 -5,021.3 1,950.5 Start DLS 13.00 10991.3'MD 11,399.8 9,032.7 -5,202.0 1,626.3 End Directional 11399.8'MD 11,438.1 9,028.3 -5,218.0 1,591.8 Start DLS 13.00 11438.1'MD 11,596.8 9,025.5 -5,272.5 1,443.5 End Directional 11596.8'MD 12,100.0 9,025.5 -5,367.4 949.3 Start DLS 8.00 12100.0'MD 12,454.6 9,025.5 -5,434.3 601.9 End Directional 12454.6'MD 14,290.7 9,030.5 -5,820.0 -1,193.2 TD at 14290.7'MD i 8/11/2010 2:31:27PM Page 11 COMPASS 2003.16 Build 73 C C N_ G m N O t71 O m m m L m A F Q.0 VD U Q,-om0ln Nmc7NmoQ.-<0000N Wmmm p_p p_� U nmo.-mm.-NQnoQ7m mm7Qf�ON- O Y Y moiri<o.-cof Opo'roi0.-�vN. .6.- OCU0 Q 0 C >NpQj U>O N tN')0Of7Q LLb A Nn 000OOmmmO, '�` Y9 cf 0 L N m Nf'QQQQQQQQQ Un N U1 U)to(ibb Un {V N ('7 U N O m 0 n N 0 0 0 O 0 0 0 0 0p 0 0 0 0 0 0.7 0 .2 + + I' 00m.-ONU)Om000000O0 0000 O•N0 -541 C d LLOmi.jO.-:06, C)nO CO I- N� cn n '- mm m mO) �$ I. .G+ 000000OOOOOOm000000m000-o i 0000O0O0O00O00000000om000 N in ) 0O NetOQQ OOO V)O NlnO)ntnOOn mf-mppO U C- �\ ^ n U)0Q m Q 00Q QO U)Q m N n.-NN ON n Nr �y �s!pp �tnmO(OmO mO�mmmU)l•')mmQ m)"))")QQQmN • �pZ 1jp 41Ik aC. C, N 0 O > U1 Wmonci ci NmO.-m.-mt7)pmmll Oi CIVN mO°ADZ 0� ^ a +CCO CO.-NNNNNNNmininh NR,-mmm N0000,- m -qr m� �m� _ l J� I- Y,,,�Y C N O N0OQDO,.Q N NQQ N.Q-COON 0 ONNJm N�000 m d 1 0 cCj N Z : !!!! !!! ! g!! !!Nm) Qm N U)C O) W t•)Oi rN0OtOD fAO tQOoN C� U) �MmmU)N NN- �OUiN0U)U)m U)ONOU)NO 1-111 _m mnmmNm)n OOOmMNNNiffliIii 3 m m N Q m m n O 0 m m O O O O O O O O O O O O O n IL O O N N M m m m n m m m N �' (•M) N NNQtONmm OU)NU)U�OOOOt7 In NNto to tnn� p CO Qn.-mmm.- rQQ0000 mm Z2 C« NN�Nmmmm0N f7QQQQNNNNI�UNNNU) R - pp N p N N N N p N p N p N p N N N N p N N.yy N C ;_ u V - - 6) Ctovmm Noulo8I Oo NOOOONOr8 it F-9V --- )DNNNU)U))<a•c<Omm000OC)OmOmm C�" O O C OQQQ NNC)N NQ Q 0000000 0 000 m0 Z� yN y� 0 J.- A •>. 0000.-0Nmmmm0NN,-ONNOm)ONO0O ' {p f") N •9n MNnnnn Nmm.-.-0NOmt')0N)ON o() y2t Cs. 00 C_U)_N m NN COO(-�-p)NO mC W e 00000(000 N IQOm g Z MC,M m m m m O O O Omm Q Q N m N N N N N N V Y' > > 0 U 0�N"QNmnmm N N Q p U)�N7Q Umnmm NN NNN � g S A S S m $ $ $ Q + p 2 S 2 g o ! ' � i � � iii 11 1 U LL 1 m G N N.40 0U0 a 8 A N iA.-n Q m O Lil _� E nd R o C m 'Z tom _ - Q _cv C . _ z- () C g O p 4C Q p y cl 55 1 C T� O E0 V]Z pnm k `‘ )n ct C 3 T FCd F LL a.°= 3 8�-2 rnrci cd @2 Nmm �m r `� r�i > - o I ° Ifli � •O n 11101,• filk fiwF r, N ffi :Eaaa m C < E_w £ 333 e t z° u ,, o 7 •>>:;::: �¢. G01 �� _ b0 g W QQ UU g Y N Q 8411.eil --- IGO Q Egg°.O L EmEmE 4. k ii M PPE ^ ! N p N Z 'n en T Z 2 W lg 1 • BPPASSPORT • Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: D-141 KB @ 67.50ft(39.5'GL/MSL+28'KB) Reference Site: PB J Pad MD Reference: D-141 KB @ 67.50ft(39.5'GL/MSL+28'KB) Site Error: 0.00ft North Reference: True Reference Well: J-20 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Weilbore Plan J-20C Database: EDM.16-Anc Prod-WH24P Reference Design: J-20C WP6.0 Offset TVD Reference: Offset Datum Reference J-20C WP6.0 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of referE Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 3,145.00 to 14,290.70ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,626.27ft Error Surface: Elliptical Conic Survey Tool Program Date 8/11/2010 From To (ft) (ft) Survey(Weilbore) Tool Name Description 30.00 3,145.00 1 :Schlumberger GCT multishot(J-20) GCT-MS Schlumberger GCT multishot 3,145.00 3,350.00 J-20C WP6.0(Plan J-20C) INC+TREND Inclinometer+known azi trend 3,350.00 9,961.93 J-20C WP6.0(Plan J-20C) MWD+IFR+MS MWD+IFR+Multi Station 9,961.63 14,290.70 J-20C WP6.0(Plan J-20C) MWD+IFR+MS MWD+IFR+Multi Station 8/11/2010 2:55:02PM Page 2 of 4 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: D-141 KB @ 67.50ft(39.5'GUMSL+28'KB) Reference Site: PB J Pad MD Reference: D-141 KB @ 67.50ft(39.5'GUMSL+28'KB) Site Error: O.00ft North Reference: True Reference Well: J-20 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Welibore Plan J-20C Database: EDM.16-Anc Prod-WH24P Reference Design: J-20C WP6.0 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB H Pad H-05-H-05B-H-05B Out of range H-16-H-16B-H-16B 13,943.64 12,652.00 1,073.43 421.30 652.69 Pass-Major Risk H-20-H-20-H-20 12,957.04 10,330.00 736.94 440.63 308.63 Pass-Major Risk H-27-H-27-H-27 13,682.78 10,125.00 1,295.32 235.14 1,087.15 Pass-Major Risk H-27-H-27A-H-27A 13,682.78 10,125.00 1,295.32 235.14 1,087.15 Pass-Major Risk PB J Pad J-08-J-08A-J-08A Out of range J-08_DIMS-J-08-J-08 Out of range J-08_DIMS-J-08A-J-08A Out of range J-09-J-09-J-09 3,148.41 3,975.00 1,496.11 90.13 1,408.25 Pass-Major Risk J-09-J-09A-J-09A 3,150.00 3,975.00 1,499.68 90.24 1,411.71 Pass-Major Risk J-12-J-12-J-12 Out of range J-13-J-13-J-13 Out of range J-13-J-13A-J-13A Out of range J-15-J-15-J-15 8,849.29 9,825.00 1,072.45 912.90 258.62 Pass-Major Risk J-15-J-15A-J-15A 8,849.29 9,825.00 1,072.45 912.90 258.62 Pass-Major Risk J-15-J-15B-J-15B 8,849.29 9,825.00 1,072.45 912.90 258.62 Pass-Major Risk J-15-J-15B-Plan#4 8,849.29 9,825.00 1,072.45 913.01 258.52 Pass-Major Risk J-20-J-20-J-20 3,394.05 3,400.00 25.46 147.15 -120.71 FAIL-Major Risk J-20-J-20A-J-20A 3,394.05 3,400.00 25.46 147.15 -120.71 FAIL-Major Risk J-20-J-20B-J-20B 3,394.05 3,400.00 25.46 147.15 -120.71 FAIL-Major Risk J-20_DIMS-J-20-J-20 Out of range J-20_DIMS-J-20A-J-20A Out of range J-20_DIMS-J-20B-J-20B Out of range J-23-J-23-J-23 Out of range J-23-J-23A-J-23A Out of range J-23-J-23A-J-23A wp03 Out of range J-23_DIMS-J-23-J-23 Out of range J-23_DIMS-J-23A-J-23A Out of range PB Q Pad 0-01A-Q-01A-Q-01A 13,847.06 11,315.00 903.98 408.39 499.16 Pass-Major Risk 0-02-Q-02-Q-02 14,285.87 8,150.00 1,158.62 314.56 1,018.08 Pass-Major Risk Q-02-Q-02A-Q-02A 14,275.36 10,725.00 944.17 411.94 537.50 Pass-Major Risk Q-02-Q-02APB1-Q-02APB1 14,285.87 8,150.00 1,158.62 314.56 1,018.08 Pass-Major Risk Q-02A DO NOT USE-Q-02A-Q-02A 14,275.36 10,725.00 944.17 411.95 537.50 Pass-Major Risk Q-02APB1 DO NOT USE-Q-02APB1 -Q-02APB 14,285.87 8,150.00 1,158.62 314.56 1,018.08 Pass-Major Risk 0-03-0-03-0-03 11,869.84 9,250.00 303.77 290.79 20.49 Pass-Major Risk Q-03-Q-03A-Q-03A 11,985.43 9,175.00 383.85 289.84 110.22 Pass-Major Risk 0-04-Q-04B-Q-04B 11,906.67 11,166.00 1,365.26 218.50 1,148.23 Pass-Major Risk 0-05-Q-05-Q-05 9,239.52 7,800.00 791.04 232.49 640.62 Pass-Major Risk Q-05-Q-05A-Q-05A 9,669.78 8,400.00 727.57 236.52 597.03 Pass-Major Risk 0-05-Q-05B-Q-05B 9,674.83 8,400.00 727.94 236.94 597.06 Pass-Major Risk 0-06-0-06-0-06 7,753.41 6,800.00 833.38 444.23 514.31 Pass-Major Risk Q-06A-Q-06A-Q-06A 7,753.41 6,800.00 833.38 444.23 514.31 Pass-Major Risk 8/11/2010 2:55:02PM Page 3 of 4 COMPASS 2003.16 Build 71 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-20 Project: Prudhoe Bay TVD Reference: D-141 KB @ 67.50ft(39.5'GUMSL+28'KB) Reference Site: PB J Pad MD Reference: D-141 KB @ 67.50ft(39.5'GUMSL+28'KB) Site Error. 0.00ft North Reference: True Reference Well: J-20 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan J-20C Database: EDM.16-Anc Prod-WH24P Reference Design: J-20C WP6.0 Offset TVD Reference: Offset Datum Reference Depths are relative to D-141 KB @ 67.50ft(39.5'GUMSL+Coordinates are relative to:J-20 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is: 1.10° Ladder I I Plat 1600 I I �� I 1 r 14 I 1 j iti': 1 FP.' 1 I 1 ! I 11l..., _ I -il.- _ t,, !, I I I I rt, ^� I I *. I I 1 yr I IYj ! 1 1. 0 O I I 0 1 ',, cr I 1 �¢., s I QI I .R I 1 I*� pr I I .r£ I I MI r 1 I 800 I 1 I 1 akiyr! i 1 �` I I 1.=d I C 1 Yf O I 1 "I 1 I U _ _ __J_ _ J 4 J_ _ __ _ _ __ J_ ___ ____ J__ _ _ __J_ . O I I I I I I I I ♦j 1 1 1 I 2 1 I I 1 C I I 7R I 1 I I w 400 I 1 1 I -- ix 1 1 I 1 I I I I I I I y,E 1 I I I 1 J � I I I 1 1 *y 1 1 1 1 I I I I Iii.I I I I 1 0 0 2500 5000 L E G7P:KID 10000 12500 15000 M easuted Depth(2500 Tin) H-05,H-05B,H-05B VD p- J-15,J•15,J-1513 $ Q-0 1A,Q-0 IA.Q-01AV1 H-16.H-168,H-1e8 V2 -$- J-15,J-15A,J-15AV1 Q-02,Q-02.Q-02V1 H-20,H-20.H-20 V1 J.15,J-158,J-158V2 -9- Q-02,0-02A,Q-02AVI H-27.H-27,H-2T V4 - J-15.J-158.Plan#4V4 -$- Q-02,Q-02APB1,Q-02APB1VI H-27,H-27A,H-2TAV2 -e J-20,J-20,J-20 V1 -15- Q-02A00 NOT USE,Q-02A,0-02AVI J-C 8.J-08.J-08 V4 $- .120,J-20A,J-20AV3 -- 13-02AP81 DO NOT USE.O-02AP81,Q-02AP J-C8,J-08A,J-08AV8 -0- J-20.J-208.J-208 V2 Q-03,Q-03,O-03 V1 J-C8.J-08PB1,J-08PEll 43 -0- J-20_DMS,J-20,J-20V0 13-03,Q-03A.0-03AV1 J-C 8 0MS,J.08.J-08W -e- .12D_DMS.J•20A,J•20AW 0-04.0-048,0-048 VO J-C8_DMS,J-08A,J-08AVU $ .1-20_OIMS.J-208.J-20BV0 -1;:- Q-05,Q-05,0-05V11 J-CO3J-09,J-09 V1 --3 J-23.J-23,J-23V1 -- Q-05.Q-05A,Q-05AV16 J4l8 er+,JZTSRV2 -s- 3•13..1-N ,r2.ssiv4 -}--2-03.0-0'31!,0-CJ7lV6 8/11/2010 2:55:02PM Page 4 of 4 COMPASS 2003.16 Build 71 Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Friday, August 06, 2010 3:20 PM To: 'Rose, John G (ASRC)' , • e Cc: Egbejimba, Uchenna J; Maunder, Thomas E (DOA) (�" Subject: RE: J-20B P&A ( PTD 202-170) pr 210 - 12-`� John, After reviewing the well file and the information provided in your email the procedure you propose would meet the requirements stipulated by 20AAC25.110 section C. Since the open lateral (J-20B) is in the same pool as the target reservoir for the rig sidetrack there is no issue with crossflow of fluids between zones or pools. Additionally, even though the cement plug is almost 1700' and away from the open pert zone in J-20B the well will be properly contained from migrating to other strata or surface by the cement plug and confining 4.5" casing liner that was fully cemented. The commission has discretion regarding alternate methods of P &A wells and your cement plug above the fish would meet this requirement provided it passes a pressure test. Call me if there needs to be any further clarification or discussion. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose, John G (ASRC) [mailto:John.G.Rose @bp.com] Sent: Friday, August 06, 2010 12:17 PM To: Schwartz, Guy L (DOA) Cc: Egbejimba, Uchenna J Subject: FW: J-20B P&A Guy, As we consider the issues associated with the sidetracking of the J-20B well to a new Ivishak Zone 2 target as the J-20C well, AOGCC approval of our P&A plan for the current J-20B well is a very critical issue which will have a significant impact on our moving forward with a sidetracking plans for this well. Therefore, given the following brief description of the well in its current condition and the proposed P&A, please provide some feedback as whether this plan meets AOGCC requirements: 1. J-20B is currently shut-in/suspended post the 4/09 RWO where"junk"was left in the well above a wireline retrievable plug (10,879' MD). 2. During the 4/09 RWO (which was designed to install a scab liner to resolve a PC/production packer leak), after cementing the scab liner and while trying to clean-out above 4.5"WRP, 3 fishing assemblies were broke off inside the 4-1/2"tubing and a significant effort was made to recover the junk and salvage the J-20B well. However, after the recovery of 2 of the fish, the current well was suspended with a partial boot basket and a 5' mill remaining in the well as un-recovered junk above the WRP. 3. J-20B is now being considered for a rotary sidetrack which will involve sidetracking the well from above the existing 7" scab liner out of the 9-5/8" casing at-3170' MD targeting new Ivishak Zone 2 reserves. 4. The proposed P&A for this well will be to pump cement down the existing 4-1/2" kill string placing a cement plug from the top of the WRP at 10,879' MD back up the well to -9792' MD on both sides of the kill string. Given our un-successful attempts to recover the existing junk in this well, the approval of this P&A plan will allow us to move forward with the our planning efforts for J-20C RST with a clear understanding of our P&A 9/7/2010 Page 2 of 2 requirements. I have attached a document to this e-mail which provides additional details of this well's history and RST plans as well as 2 well schematics detailing the well in its current condition as well as its planned post P&A condition, therefore, please advise as to your agreement/approval of this planned P&A. Thanks -jr Note: This planned P&A is based upon the AOGCC regulations as referenced below: http://www.legis.state.ak.us/basis/folioproxy.asp?url=http:/iwwwjnu01.legis.state.ak.us/cgi- bin/folioisa.dll/aac/query= JUMP:%2720+aac+252E112%27]/doc/{©1}?firsthit (c) Plugging of cased portions of a wellbore must be performed in a manner that ensures that all hydrocarbons and freshwater are confined to their respective indigenous strata and are prevented from migrating into other strata or to the surface. The minimum requirements for plugging cased portions of a wellbore are as follows: (1) perforated intervals must be plugged by one of the following methods: (A) by the displacement method, a cement plug placed from 100 feet below the base to 50 feet above the base of the perforated interval and from 50 feet below the top to 100 feet above the top of the perforated interval; (B) by the displacement method, a cement plug placed from the well's total depth to 100 feet above the top of the perforated interval; (C) by the displacement method, a cement plug placed from the well's plugged-back total depth to 100 feet above the top of the perforated interval, if all hydrocarbon-bearing, abnormally geo-pressured, and freshwater strata below are isolated; however, the commission will approve plugging from the top of fill or the top of junk instead of from the plugged-back total depth, if the commission determines that the objectives of this subsection will be met; John G.Rose BPX-Staff Engineer Office 907/564-5271 Cell 907/748-5223 FAX 907/564-4040 Home 907/243-8813 9/7/2010 Alaska Department of Natural Resources Land Administration System Page 1 of, NAlaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources r---- Alaska DNR Case Summary File Type: ADL File Number: 28281 Printable Case File Summary See Township,Range, Section and Acreage? ( New Search 0 Yes O No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28281 1__raP Search for Status Plat Updates As of 09/02/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: O11N Range: 013E Section: 03 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 04 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 09 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 10 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-92 TUN, R13E, UM 3, 4, 9, 10 2,560.00 End of Case Summary Last updated on 09/02/2010. http://dnr.alaska.gov/projects/las/Case Summary.cft?FileType=ADL&FileNumber=28281... 9/2/2010 Alaska Department of Natural Resources Land Administration System Page 1 of7 ( Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28284 0+Printable Case File Summary See Township, Range, Section and Acreage? O Yes 0 No r New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28284 Search for Status Plat Updates As of 09/02/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 15 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 16 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 21 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 22 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-95 T11N-R13E-UM 15,16,21,22 2560.00 End of Case Summary Last updated on 09/02/2010. http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=28284... 9/2/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME / 4%1".4/ PTD# o /0 fo?4*1 ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: .e.PC/D•4& .04/ POOL: /.0,e2 ..DiS/0-.Z.oy 0'4 Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the till "' : Commission to obtain advance approval of such water well testing " program. lOt Rev: 1/11/2008 C- I Cl)To co O a) a N N_ 0 5 o m a) c Q c O. ,O a) 7 `o E > s w a a O a v E O ° m co L O N a a 3 o o I D °. O N w -,n N N a) N a > a °- E 3 ca) c c �° c) a) o F- 1 c > 0 u) CO (0 Z a) o f : co -o E a °- a) -0 : O C a m a U o 0 N ai ° a O _cn co a) Z co n C a 0 >- N o a : 7 0 O ` w CO C ON = m a) - M N m C al o o •o _ -o @ d E ° II u7i m N •M c‘..1 C O O) m C N 3 W `t 0 N N = CO co .-C 'a N Q N d m N n 3 _c a _m a CO CO c N a) m a Y• O N 0 p. ° T. E O N 4k O) D1 'U) a M. T CO. m a m° N m m c° N CO _ E a) o c -o N CO O U U O N N 7 _O E N M U o 0 U C co N -?-', aS 0 II Z N c > 7 U U 7 0 @ E N �O c a O N Y "O a) (p L Q t Z co O O U5 O 0 O) < co X C) m 0 U) U) a O EZ a a 2 In 2 I CO a > w a C) N. N N N CO CO co U) U) U) N N CO N N N CO N co N CO N N' N Q a) a), a) a) a) Cl) a) a) Cl) a) a) a) Q Q Q Q. Q Q Q Q. a) a) a) a). co Q a) a5 a) a) a) a) Q O. Q Q Q Q, 0. Z >- >- >- >- >- >- >- >- >- >- >- >- Z Z Z Z Z Z Z Z >• >- >- >- >- Z >- >- >- >- >- >- Z Z Z Z Z Z. T N o _ °= , N T 0^_ U N o co c .c E 3 — E 0 O U 0 '_ a) C 0 N o U .14 U- t A•7 ` n N a C O ° o a ) U ,0 it v° 12 3 E _ 3 0 co O 0 co co U T 0 C N 0 0 N N Q 0) 0 E N O w co 0 CO N y a C J O _ _ 0 0 4 N Q cn O` c 0 co W 0 co N o, 0 1 40 N E m -o x- 05 o a) o) "co- ~= c f a c o a) _ 7 't c E , N _ a T E o'Li a�ai I a o 3 = c 3 'cp O 0 p O N „ y 0 N c 0 N d CO 3 '06 N 0 m U c = a) w@ u) ui O O xs E aai m .3 O M li O 7 N N 9 O) 3 O U) c co .0 c N 7 0- 7 < N N 0 a) O) W - -o o C •O 0 a) E -o a) a) a D 0 ` a) CO 0 0 0) 0 a L C c `) C 0 _ 0 N .> M C U H O N o a' N L 0 E N o a °)C 7 Q E E o c c E m o c n c 0 rn c = Y o 0 •`o C o -O c (n 3 O U a7 a v c o o N O 0. D < 0 a) 0 •c > 0 7 7 ° o CO fa' o - ° O o 0 a) m ° E m m m Q m - N o m 0 0 c u) �S•a J U c 0 o 0 0 C - a) o = E 7 3 0 o a) s m o v 3 E�cc)a Q 0 c -o m m m m 0 a) w w -o 0 N -0 E ai a) L c a c co co m .N L aa)) o N o a 3 ° c T w E o z a -co N N 'm U) -° m 3, 3 0 a) .. o 0 = o = " ° a0ai o N a 'a m 3 o L Z o 0,= o O O C ' -0 `0 > a) .a -°. -o N. O O) C a N a ° as a) (p o ° 0 0 a) E o c o 0 0 o c a o o U) E 0 a) E r 0 0 a 7 c 0(5 ~ Cl) a 0 a n n 0 a o) u)) a c v a) ° °- o a) 0 0 a) a CO E w o CO N CO c (F DD U co E O O ,,-.. N @ a N N (p L r C N a 7 7 @ N a) O T -0 3 = -C N -O .=N •O n T.) O CU a`) C c a a N >.. as 0 0 0 3 E o o) �) o o a) c c@ - ' a w @ o v o ° 0 �) > m Cr LL a 0 E a) m 0 o r s ' c N 0a 00 0 'u°�i) �° L Cl)3 O o U) 'c o 0 m C)) c c E x ))) 7 (p a) a) 'C a3 a7 E a) 3 7 0 o 0 CO CO U a) a) _ .[5 "O N ° = C U co N co oU C F" w C 0 0 0 0 ) o o .U-• ° N 0 N O > U a) O O - cp 7 2 N a E 3 N C . 0 N 0 'O m .E N a o 0 0 a05 m o E E c- a3 ° c c t H H I- a, a) a 3 a a o ,_ a 0 E ca .N m e m Y a) ai c a) a) a) 7 -0 n n 0 N CO 0 - m o 0 7 2 2 2 co -O 0 a a c O O .0 ° 0 a) m 0 a) o 0 > a J D O O a, a U Q a z U (n U U U U Q Q � 0 m m U g a 0 (n (n U a) a O — N M V In co co O O N M d- LO CO 1N W O) O N M V to CO CO O EO — N co V CO N- co O) N N N N N N N N N N CO CO CO M M M M M M M NO 0 . _o O_ o_ 2 c a) O a) O d O U C O C co N CO N CO N 0_ rg CI N 0 Cl N O0)N Ili N O N N o T ) E c .J C ° ` O W a�a a s c a 0 a> Z Q CD Well History File AP EN 11 Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history the. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Feb 23 09:51:22 2011 Reel Header Service name LISTPE Date 11/02/23 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 11/02/23 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS WELL NAME: J-20C API NUMBER: 50029217160300 OPERATOR: BP Exploration (Alaska) , Inc LOGGING COMPANY: Sperry Sun TAPE CREATION DATE: 22-FEB-11 JOB DATA MWD RUN 3 MWD RUN 4 MWD RUN 5 JOB NUMBER: K-MW-000773898 K-MW-000773898 K-MW-000773898 LOGGING ENGINEER: BEN SCHULZE BEN SCHULZE BEN SCHULZE OPERATOR WITNESS: RICHARD BORD DUNCAN FERGU DUNCAN FERGU MWD RUN 6 MWD RUN 7 MAD RUN 7 JOB NUMBER: K-MW-000773898 K-MW-000773898 K-MW-000773898 LOGGING ENGINEER: BRIAN STEPHE BRIAN STEPHE BRIAN STEPHE OPERATOR WITNESS: DUNCAN FERGU DUNCAN FERGU DUNCAN FERGU MWD RUN 8 JOB NUMBER: K-MW-000773898 LOGGING ENGINEER: BRIAN STEPHE OPERATOR WITNESS: RICHARD BORD SURFACE LOCATION SECTION: 9 TOWNSHIP: 11N RANGE: 13E FNL: 1215 FSL: FEL: 802 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 68.67 GROUND LEVEL: 42.23 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 8.500 9. 625 3152.0 2ND STRING 6.125 7.000 10536.0 3RD STRING PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. MWD RUN 1 WAS A CLEAN OUT RUN AND IS NOT PRESENTED. 4 . MWD RUN 2 WAS A DIRECTIONAL ONLY RUN. DURING THE RUN THE WHIPSTOCK WAS POSITIONED, WINDOW MILLED, AND A RATHOLE DRILLED. THE TOP OF THE WHIPSTOCK WINDOW WAS 3152' MD, 2868' TVD. THE BOTTOM OF THE WHIPSTOCK WINDOW WAS 3169' MD, 2880' TVD. RATE OF PENETRATION DATA FOR MWD RUN 1 WAS MERGED ONTO THE TOP OF MWD RUN 2. 5. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY- PHASE 4 (EWR-P4) , PRESSURE WHILE DRILLING AND DRILLSTRING DYNAMICS SENSOR (DDSr) . 6. MWD RUN 4 - 5 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY- PHASE 4 (EWR-P4) , DRILLSTRING DYNAMICS SENSOR (DDSr) . COMPENSATED THERMAL NEUTRON POROSITY (CTN) , AZIMUTHAL LITHO-DENSITY (ALD) , PRESSURE WHILE DRILLING (PWD) , AND AT-BIT INCLINATION. 7. MWD RUN 6 - 8 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY- PHASE 4 (EWR-P4) , DRILLSTRING DYNAMICS SENSOR (DDSr) . COMPENSATED THERMAL NEUTRON POROSITY (CTN) , AZIMUTHAL LITHO-DENSITY (ALD) , AND AT-BIT INCLINATION. 8. MEASUREMENT AFTER DRILLING DATA ACQUIRED AFTER DRILLING DURING MWD RUN 7 FROM 11700 FT MD, 9028' TVD TO 10710' MD, 8686' TVD (BIT DEPTH. ) DATA HAS BEEN DEPTH CORRECTED TO DRILLING DATA AND PRESENTED IN A SEPARATE PRESENTATION. 9. MWD IS THE PDCL FOR J-20C. PRIMARY DEPTH CONTROL INSTRUCTIONS WERE PROVIDED VIA E-MAIL FROM D. DORTCH (SAIC/BP) DATED 18 FEB 2011, QUOTING AUTHORIZATION FROM WALTER TIFENTAL (BP) . 10. MWD RUNS 2 - 8 REPRESENT WELL J-20C WITH API# 50-029-21716-03. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14295'MD, 9020'TVD. ROPA = Avg Rate of Penetration RSPD = Running Speed DGRC = DGR Combined Gamma Ray R09P = 9in Phase Resistivity R15P = 15in Phase Resistivity R27P = 27in Phase Resistivity R39P = 39in Phase Resistivity EWXT = EWR Formation Exp Time TNPS = CTN Porosity Sandstone TNFA = CTN Far Avg Count Rate TNNA = CTN Near Avg Count Rate ACDL = ALD LCRB Comp Density ADCL = ALD LCRB Den Correction APEL = ALD LCRB Pe Factor CDBQ = ALD Comp Density B-Quad CDTQ = ALD Comp Density T-Quad CDLQ = ALD Comp Density L-Quad CDRQ = ALD Comp Density R-Quad DCBQ = ALD Den Correction B-Quad DCTQ = ALD Den Correction T-Quad DCLQ = ALD Den Correction L-Quad DCRQ = ALD Den Correction R-Quad PEBQ = ALD Pe Factor B-Quad PETQ = ALD Pe Factor T-Quad PELQ = ALD Pe Factor L-Quad PERQ = ALD Pe Factor R-Quad AHSI = ALD Hole Size Indicator ALRP = ALD RPM PARAMETERS USED IN NUCLEAR LOG PROCESSING: HOLE SIZE: 6.125" FIXED MUD WEIGHT: 8. 6 - 8.75 WHOLE MUD CHLORIDES: 8, 924 - 13,366 PPM FORMATION WATER SALINITY: 11, 500 PPM CHLORIDES FLUID DENSITY: 1.00 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0. 6 FT, EXCEPT FOR ROP AND GAMMA RAY. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPX 3142.0 14237.0 RPD 3142.0 14237.0 RPS 3142.0 14237.0 RPM 3142.0 14237.0 FET 3142.0 14237.0 GR 3148.5 14230.0 ROP 3152.5 14295.0 PEF 10526.0 14217.0 DHO1 10526.0 14217.0 PEF1 10526.0 14217.0 TNNA 10526.0 14202.0 RHO]. 10526.0 14217.0 PEF4 10526.0 14217.0 FCNT 10526.0 14202.0 DHO4 10526.0 14217.0 DRHO 10526.0 14217.0 DHO3 10526.0 14217.0 PEF3 10526.0 14217.0 RHOB 10526.0 14217.0 RHO4 10526.0 14217.0 PEF2 10526.0 14217.0 NPHI 10526.0 14202.0 RHO3 10526.0 14217.0 DHO2 10527.0 14217.0 RHO2 10527.0 14217.0 CALN 10947.0 14217.0 BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 3 3142.0 10538.5 MWD 4 10493.0 10995.5 MWD 5 10902.0 12155.0 MWD 6 12062.0 12564.0 MWD 7 10622.0 13395.0 MWD 8 13303.5 14295.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .lIN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MWD G/CC 4 1 68 4 2 RHOB MWD G/CC 4 1 68 8 3 RHO3 MWD G/CC 4 1 68 12 4 RHO4 MWD G/CC 4 1 68 16 5 RHO2 MWD G/CC 4 1 68 20 6 DHO1 MWD G/CC 4 1 68 24 7 DRHO MWD G/CC 4 1 68 28 8 DHO3 MWD G/CC 4 1 68 32 9 DHO4 MWD G/CC 4 1 68 36 10 DHO2 MWD G/CC 4 1 68 40 11 CALN MWD IN 4 1 68 44 12 PEF1 MWD B/E 4 1 68 48 13 PEF MWD B/E 4 1 68 52 14 PEF3 MWD B/E 4 1 68 56 15 PEF4 MWD B/E 4 1 68 60 16 PEF2 MWD B/E 4 1 68 64 17 GR MWD API 4 1 68 68 18 FET MWD HR 4 1 68 72 19 RPX MWD OHMM 4 1 68 76 20 RPS MWD OHMM 4 1 68 80 21 RPM MWD OHMM 4 1 68 84 22 RPD MWD OHMM 4 1 68 88 23 ROP MWD FPH 4 1 68 92 24 FCNT MWD CP30 4 1 68 96 25 NCNT MWD CP30 4 1 68 100 26 NPHI MWD PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3142 14295 8718.5 22307 3142 14295 RHO1 MWD G/CC 0.877 3.121 2.34125 6084 10526 14217 RHOB MWD G/CC 0. 645 3.079 2.36495 7383 10526 14217 RHO3 MWD G/CC 0.588 3.114 2.34887 6290 10526 14217 RHO4 MWD G/CC 1.006 3.097 2.35264 5968 10526 14217 RHO2 MWD G/CC 1.444 3.092 2.37938 5466 10527 14217 DHO1 MWD G/CC -1.873 0.609 0.0386607 6084 10526 14217 DRHO MWD G/CC -2.222 0.568 0.0745706 7383 10526 14217 DHO3 MWD G/CC -2.177 0.583 0.101558 6288 10526 14217 DHO4 MWD G/CC -1.73 0.503 0.0747664 5968 10526 14217 DHO2 MWD G/CC -1.032 0.637 0.195461 5467 10527 14217 CALN MWD IN 5.77 7.52 6.14032 4612 10947 14217 PEF1 MWD B/E 0.08 14.91 1.99458 6117 10526 14217 PEF MWD B/E 1.08 14.21 2.07007 7382 10526 14217 PEF3 MWD B/E 0. 98 16.49 2.0499 6312 10526 14217 PEF4 MWD B/E 0.8 15.16 2.0556 6045 10526 14217 PEF2 MWD B/E 0.51 8.97 2.06911 5541 10526 14217 GR MWD API 12.04 505.88 75.4645 22164 3148.5 14230 FET MWD HR 0.19 90.83 2.2209 22110 3142 14237 RPX MWD OHMM 0.16 2000 6.64582 22110 3142 14237 RPS MWD OHMM 0.06 2000 7.03901 22110 3142 14237 RPM MWD OHMM 0.06 2000 8.57102 22110 3142 14237 RPD MWD OHMM 0.02 2000 10.3694 22110 3142 14237 ROP MWD FPH 0 424. 18 124.421 22286 3152.5 14295 FCNT MWD CP30 102.11 3921.12 810.634 7353 10526 14202 NCNT MWD CP30 13572.7 53508.7 30205.1 7353 10526 14202 NPHI MWD PU 4.44 60.51 20.4949 7353 10526 14202 First Reading For Entire File 3142 Last Reading For Entire File 14295 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH NCNT 10622.0 11615.0 FCNT 10622.0 11615.0 NPHI 10622.0 11615.0 CALN 10635.0 11629.0 RHOB 10636.0 11629.0 DHO2 10636.0 11629.0 PEF4 10636.0 11629.0 RHOS 10636.0 11629.0 PEF3 10636.0 11629.0 PEF1 10636.0 11629.0 DHO1 10636.0 11629.0 DHO3 10636.0 11629.0 PEF2 10636.0 11629.0 DHO4 10636.0 11629.0 RHO4 10636.0 11629.0 RHO2 10636.0 11629.0 RHO1 10636.0 11629.0 DRHO 10636.0 11629.0 PEF 10636.0 11629.0 GR 10648.5 11642.0 FET 10655.5 11649.0 RPS 10655.5 11649.0 RPM 10655.5 11649.0 RPD 10655.5 11649.0 RPX 10655.5 11649.0 RAT 10716.0 11705.5 $ MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 7 1 10622.0 13395.0 $ REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .lIN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MAD G/CC 4 1 68 4 2 RHOB MAD G/CC 4 1 68 8 3 RHOS MAD G/CC 4 1 68 12 4 RHO4 MAD G/CC 4 1 68 16 5 RHO2 MAD G/CC 4 1 68 20 6 DHO1 MAD G/CC 4 1 68 24 7 DRHO MAD G/CC 4 1 68 28 8 DHO3 MAD G/CC 4 1 68 32 9 DHO4 MAD G/CC 4 1 68 36 10 DHO2 MAD G/CC 4 1 68 40 11 CALN MAD IN 4 1 68 44 12 PEF1 MAD B/E 4 1 68 48 13 PEF MAD B/E 4 1 68 52 14 PEF3 MAD B/E 4 1 68 56 15 PEF4 MAD B/E 4 1 68 60 16 PEF2 MAD B/E 4 1 68 64 17 GR MAD API 4 1 68 68 18 FET MAD HR 4 1 68 72 19 RPX MAD OHMM 4 1 68 76 20 RPS MAD OHMM 4 1 68 80 21 RPM MAD OHMM 4 1 68 84 22 RPD MAD OHMM 4 1 68 88 23 RAT MAD FPH 4 1 68 92 24 FCNT MAD CP30 4 1 68 96 25 NCNT MAD CP30 4 1 68 100 26 NPHI MAD PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10622 11705.5 11163.8 2168 10622 11705.5 RHO1 MAD G/CC 2. 106 3.11 2.34651 1987 10636 11629 RHOB MAD G/CC 2.146 3.05 2.37305 1987 10636 11629 RHO3 MAD G/CC 2. 118 2.946 2.3493 1987 10636 11629 RHO4 MAD G/CC 2.145 3.032 2.35917 1987 10636 11629 RHO2 MAD G/CC 1.879 3.074 2.37176 1987 10636 11629 DH01 MAD G/CC -0.059 0.442 0.0532989 1987 10636 11629 DRHO MAD G/CC -0.088 0.475 0.0741726 1987 10636 11629 DH03 MAD G/CC -0.142 0.498 0.106085 1987 10636 11629 DH04 MAD G/CC -0.09 0.328 0.0990991 1987 10636 11629 DH02 MAD G/CC -0.072 0.588 0.184082 1987 10636 11629 CALN MAD IN 5.76 9.03 6.17155 1989 10635 11629 PEF1 MAD B/E 1.01 6.72 1. 99353 1987 10636 11629 PEF MAD B/E 1.14 7.38 2.07598 1987 10636 11629 PEF3 MAD B/E 1.08 6.71 2.02283 1987 10636 11629 PEF4 MAD B/E 1.17 5.71 2.04551 1987 10636 11629 PEF2 MAD B/E 1.32 6. 18 2.09794 1987 10636 11629 GR MAD API 10.15 355.94 36.8644 1988 10648.5 11642 FET MAD HR 106.83 193. 94 143. 648 1988 10655.5 11649 RPX MAD OHMM 1.15 110. 67 10.8125 1988 10655.5 11649 RPS MAD OHMM 1.43 105.75 12. 6197 1988 10655.5 11649 RPM MAD OHMM 1.48 108.3 15.2959 1988 10655.5 11649 RPD MAD OHMM 0.95 124.01 18. 9022 1988 10655.5 11649 RAT MAD FPH 13.16 389.36 261.565 1980 10716 11705.5 FCNT MAD CP30 285.9 3398.28 787. 925 1987 10622 11615 NCNT MAD CP30 20530.3 49273 29655.7 1987 10622 11615 NPHI MAD PU 5.13 38.43 20.7989 1987 10622 11615 First Reading For Entire File 10622 Last Reading For Entire File 11705.5 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH R39P 3142.0 10485.0 R09P 3142.0 10485.0 R27P 3142.0 10485.0 EWXT 3142.0 10485.0 R15P 3142.0 10485.0 DGRC 3148.5 10492.5 ROPA 3152.5 10538.5 LOG HEADER DATA DATE LOGGED: 12-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 10538.0 TOP LOG INTERVAL (FT) : 3152.0 BOTTOM LOG INTERVAL (FT) : 10538.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 22.3 MAXIMUM ANGLE: 46.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 124724 EWR4 ELECTROMAG. RESIS. 4 66259 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 8.500 DRILLER'S CASING DEPTH (FT) : 3152.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.80 MUD VISCOSITY (S) : 45.0 MUD PH: 9.3 MUD CHLORIDES (PPM) : 900 FLUID LOSS (C3) : .0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 3.250 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.350 173.2 MUD FILTRATE AT MT: 3.500 68.0 MUD CAKE AT MT: 3.500 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD030 API 4 1 68 4 2 FET MWD030 HR 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 ROP MWD030 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3142 10538.5 6840.25 14794 3142 10538.5 GR MWD030 API 13.09 377.21 100.046 14689 3148.5 10492.5 FET MWD030 HR 0.19 28.99 0. 94778 14687 3142 10485 RPX MWD030 OHMM 0.16 2000 3. 60061 14687 3142 10485 RPS MWD030 OHMM 0.16 2000 3. 62606 14687 3142 10485 RPM MWD030 OHMM 0.18 2000 4 .40546 14687 3142 10485 RPD MWD030 OHMM 0.04 2000 4.72568 14687 3142 10485 ROP MWD030 FPH 0.21 424.18 161.013 14773 3152.5 10538.5 First Reading For Entire File 3142 Last Reading For Entire File 10538.5 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH DGRC 10493.0 10929.5 R09P 10526.0 10936.5 PERQ 10526.0 10916.5 TNFA 10526.0 10901.5 DCRQ 10526.0 10916.5 R15P 10526.0 10936.5 APEL 10526.0 10916.5 ACDL 10526.0 10916.5 PELQ 10526.0 10916.5 TNNA 10526.0 10901.5 TNPS 10526.0 10901.5 ADCL 10526.0 10916.5 R27P 10526.0 10936.5 EWXT 10526.0 10936.5 DCLQ 10526.0 10916.5 CDLQ 10526.0 10916.5 PEBQ 10526.0 10916.5 R39P 10526.0 10936.5 DCBQ 10526.0 10916.5 CDRQ 10526.0 10916.5 PETQ 10526.0 10916.5 CDBQ 10526.0 10916.5 DCTQ 10527.0 10916.5 CDTQ 10527.0 10916.5 ROPA 10539.0 10995.5 LOG HEADER DATA DATE LOGGED: 16-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 10995.0 TOP LOG INTERVAL (FT) : 10538.0 BOTTOM LOG INTERVAL (FT) : 10995.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 24.7 MAXIMUM ANGLE: 46.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 091360 CTN COMP THERMAL NEUTRON 275363 EWR4 Electromag Resis. 4 11261763 ALD Azimuthal Litho-Dens 11077936 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.50 MUD VISCOSITY (S) : 48.0 MUD PH: 9.4 MUD CHLORIDES (PPM) : 12500 FLUID LOSS (C3) : 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .410 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .157 180.2 MUD FILTRATE AT MT: .420 65.0 MUD CAKE AT MT: .400 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MWD040 G/CC 4 1 68 4 2 RHOB MWD040 G/CC 4 1 68 8 3 RHO3 MWD040 G/CC 4 1 68 12 4 RHO4 MWD040 G/CC 4 1 68 16 5 RHO2 MWD040 G/CC 4 1 68 20 6 DHO1 MWD040 G/CC 4 1 68 24 7 DRHO MWD040 G/CC 4 1 68 28 8 DHO3 MWD040 G/CC 4 1 68 32 9 DHO4 MWD040 G/CC 4 1 68 36 10 DHO2 MWD040 G/CC 4 1 68 40 11 PEF1 MWD040 B/E 4 1 68 44 12 PEF MWD040 B/E 4 1 68 48 13 PEF3 MWD040 B/E 4 1 68 52 14 PEF4 MWD040 B/E 4 1 68 56 15 PEF2 MWD040 B/E 4 1 68 60 16 GR MWD040 API 4 1 68 64 17 FET MWD040 HR 4 1 68 68 18 RPX MWD040 OHMM 4 1 68 72 19 RPS MWD040 OHMM 4 1 68 76 20 RPM MWD040 OHMM 4 1 68 80 21 RPD MWD040 OHMM 4 1 68 84 22 ROP MWD040 FPH 4 1 68 88 23 FCNT MWD040 CP30 4 1 68 92 24 NCNT MWD040 CP30 4 1 68 96 25 NPHI MWD040 PU 4 1 68 100 26 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10493 10995.5 10744 .3 1006 10493 10995.5 RHO1 MWD040 G/CC 0.877 3.121 2.39777 760 10526 10916.5 RHOB MWD040 G/CC 0.645 3.079 2.40255 782 10526 10916.5 RHO3 MWD040 G/CC 0.588 3.114 2.39851 782 10526 10916.5 RHO4 MWD040 G/CC 1.006 3.097 2.396 782 10526 10916.5 RHO2 MWD040 G/CC 1.444 3.092 2.44106 653 10527 10916.5 DHO1 MWD040 G/CC -1.873 0.418 0.0450132 760 10526 10916.5 DRHO MWD040 G/CC -2.222 0.448 0.0300422 782 10526 10916.5 DHO3 MWD040 G/CC -2.177 0.46 0.0296982 782 10526 10916.5 DH04 MWD040 G/CC -1.73 0.472 0.0369821 782 10526 10916.5 DH02 MWD040 G/CC -1.032 0.372 0.0583185 653 10527 10916.5 PEF1 MWD040 B/E 0.08 14. 91 3.01323 764 10526 10916.5 PEF MWD040 B/E 1.12 14.21 3.00832 782 10526 10916.5 PEF3 MWD040 B/E 0. 98 16.49 3.02723 782 10526 10916.5 PEF4 MWD040 B/E 0. 93 15.16 3.00824 782 10526 10916.5 PEF2 MWD040 B/E 0.68 8.97 2.62554 670 10526 10916.5 GR MWD040 API 16. 64 505.88 66.2738 874 10493 10929.5 FET MWD040 HR 1.22 90.83 5.88943 822 10526 10936.5 RPX MWD040 OHMM 0.66 2000 32.8173 822 10526 10936.5 RPS MWD040 OHMM 0.06 401.26 34 .0398 822 10526 10936.5 RPM MWD040 OHMM 0.06 1776. 14 49. 6293 822 10526 10936.5 RPD MWD040 OHMM 0.02 1835. 14 80. 9699 822 10526 10936.5 ROP MWD040 FPH 0 241.54 46.3781 914 10539 10995.5 FCNT MWD040 CP30 102.11 3921.12 878.262 752 10526 10901.5 NCNT MWD040 CP30 13572.7 53508.7 30272 752 10526 10901.5 NPHI MWD040 PU 4.44 60.51 20.9845 752 10526 10901.5 First Reading For Entire File 10493 Last Reading For Entire File 10995.5 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNPS 10902.0 12061.5 TNNA 10902.0 12061.5 TNFA 10902.0 12061.5 ADCL 10917.0 12076.5 CDLQ 10917.0 12076.5 ACDL 10917.0 12076.5 APEL 10917.5 12076.5 DCLQ 10918.0 12076.5 PELQ 10918.0 12076.5 DGRC 10930.0 12089.5 R39P 10937.0 12096.5 R27P 10937.0 12096.5 R15P 10937.0 12096.5 R09P 10937.0 12096.5 EWXT 10937.0 12096.5 PETQ 10947.0 12076.5 PERQ 10947.0 12076.5 AHSI 10947.0 12076.5 CDRQ 10947.5 12076.5 CDTQ 10947.5 12076.5 DCTQ 10947.5 12076.5 DCBQ 10947.5 12076.5 CDBQ 10947.5 12076.5 PEBQ 10947.5 12076.5 DCRQ 10947.5 12076.5 ROPA 10996.0 12155.0 LOG HEADER DATA DATE LOGGED: 20-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 12154.0 TOP LOG INTERVAL (FT) : 10995.0 BOTTOM LOG INTERVAL (FT) : 12154.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 47.0 MAXIMUM ANGLE: 97.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 268169 CTN COMP THERMAL NEUTRON 274120 EWR4 Electromag Resis. 4 108711 ALD Azimuthal Litho-Dens 193135 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8. 60 MUD VISCOSITY (S) : 49.0 MUD PH: 9.4 MUD CHLORIDES (PPM) : 10400 FLUID LOSS (C3) : 8.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .380 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .141 187.3 MUD FILTRATE AT MT: .400 65.0 MUD CAKE AT MT: .390 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MWD050 G/CC 4 1 68 4 2 RHOB MWD050 G/CC 4 1 68 8 3 RHOS MWD050 G/CC 4 1 68 12 4 RHO4 MWD050 G/CC 4 1 68 16 5 RHO2 MWD050 G/CC 4 1 68 20 6 DHO1 MWD050 G/CC 4 1 68 24 7 DRHO MWD050 G/CC 4 1 68 28 8 DHO3 MWD050 G/CC 4 1 68 32 9 DHO4 MWD050 G/CC 4 1 68 36 10 DHO2 MWD050 G/CC 4 1 68 40 11 CALN MWD050 IN 4 1 68 44 12 PEF1 MWD050 B/E 4 1 68 48 13 PEF MWD050 B/E 4 1 68 52 14 PEF3 MWD050 B/E 4 1 68 56 15 PEF4 MWD050 B/E 4 1 68 60 16 PEF2 MWD050 B/E 4 1 68 64 17 GR MWD050 API 4 1 68 68 18 FET MWD050 HR 4 1 68 72 19 RPX MWD050 OHMM 4 1 68 76 20 RPS MWD050 OHMM 4 1 68 80 21 RPM MWD050 OHMM 4 1 68 84 22 RPD MWD050 OHMM 4 1 68 88 23 ROP MWD050 FPH 4 1 68 92 24 FCNT MWD050 CP30 4 1 68 96 25 NCNT MWD050 CP30 4 1 68 100 26 NPHI MWD050 PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10902 12155 11528.5 2507 10902 12155 RHO1 MWD050 G/CC 2.083 2.765 2.30523 1459 10947.5 12076.5 RHOB MWD050 G/CC 2.138 3.058 2.33988 2320 10917 12076.5 RHOS MWD050 G/CC 2.118 2.971 2.32649 2126 10917 12076.5 RHO4 MWD050 G/CC 2.13 2.698 2.31831 1504 10947.5 12076.5 RHO2 MWD050 G/CC 2.15 2.696 2.32999 1419 10947.5 12076.5 DHO1 MWD050 G/CC -0.054 0.437 0.0551789 1459 10947.5 12076.5 DRHO MWD050 G/CC -0.05 0.452 0.0914371 2320 10917 12076.5 DHO3 MWD050 G/CC -0.048 0.477 0.1096 2124 10918 12076.5 DHO4 MWD050 G/CC -0.016 0.437 0.0904129 1504 10947.5 12076.5 DHO2 MWD050 G/CC -0.004 0. 637 0.187982 1419 10947.5 12076.5 CALN MWD050 IN 5.82 7.34 6.16133 1375 10947 12076.5 PEF1 MWD050 B/E 0. 96 8.28 1.81651 1470 10947.5 12076.5 PEF MWD050 B/E 1.21 6.38 1. 92757 2319 10917.5 12076.5 PEF3 MWD050 B/E 1.09 7.03 1. 92811 2124 10918 12076.5 PEF4 MWD050 B/E 1.07 4. 93 1.89184 1529 10947 12076.5 PEF2 MWD050 B/E 0.51 5. 63 1. 94258 1452 10947 12076.5 GR MWD050 API 12.71 124.47 24.4676 2320 10930 12089.5 FET MWD050 HR 1.08 45.17 4.10842 2320 10937 12096.5 RPX MWD050 OHMM 1.28 39. 64 11.2646 2320 10937 12096.5 RPS MWD050 OHMM 1.44 39.11 13.2501 2320 10937 12096.5 RPM MWD050 OHMM 1.73 47.36 15.567 2320 10937 12096.5 RPD MWD050 OHMM 1. 96 45.87 17.2861 2320 10937 12096.5 ROP MWD050 FPH 1.05 306. 69 56. 6292 2319 10996 12155 FONT MWD050 CP30 357.21 2508.23 717.122 2320 10902 12061.5 NCNT MWD050 CP30 21379.1 42364.5 28991.9 2320 10902 12061.5 NPHI MWD050 PU 6.59 30.9 21.7613 2320 10902 12061.5 First Reading For Entire File 10902 Last Reading For Entire File 12155 File Trailer Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.006 Physical EOF File Header Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNPS 12062.0 12477.5 TNNA 12062.0 12477.5 TNFA 12062.0 12477.5 DCLQ 12067.5 12490.5 DCBQ 12077.0 12490.5 CDRQ 12077.0 12490.5 PEBQ 12077.0 12491.0 PERQ 12077.0 12491.0 CDBQ 12077.0 12490.5 ADCL 12077.0 12492.5 DCTQ 12077.0 12492.5 DCRQ 12077.0 12490.5 CDTQ 12077.0 12492.5 PELQ 12077.0 12491.0 PETQ 12077.0 12492.5 CDLQ 12077.0 12490.5 ACDL 12077.0 12492.5 AHSI 12077.0 12490.5 APEL 12077.0 12492.5 DGRC 12090.0 12505.5 EWXT 12097.0 12512.5 R27P 12097.0 12512.5 R39P 12097.0 12512.5 R09P 12097.0 12512.5 R15P 12097.0 12512.5 ROPA 12155.5 12564.0 LOG HEADER DATA DATE LOGGED: 21-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 12564.0 TOP LOG INTERVAL (FT) : 12154 .0 BOTTOM LOG INTERVAL (FT) : 12564.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 82.5 MAXIMUM ANGLE: 97.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 268169 CTN COMP THERMAL NEUTRON 274120 EWR4 Electromag Resis. 4 108711 ALD Azimuthal Litho-Dens 193135 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.70 MUD VISCOSITY (S) : 47.0 MUD PH: 9.3 MUD CHLORIDES (PPM) : 11200 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .390 65.0 MUD AT MAX CIRCULATING TERMPERATURE: .135 201.4 MUD FILTRATE AT MT: .410 65.0 MUD CAKE AT MT: .400 65.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO' MWD060 G/CC 4 1 68 4 2 RHOB MWD060 G/CC 4 1 68 8 3 RHO3 MWD060 G/CC 4 1 68 12 4 RHO4 MWD060 G/CC 4 1 68 16 5 RHO2 MWD060 G/CC 4 1 68 20 6 DHO1 MWD060 G/CC 4 1 68 24 7 DRHO MWD060 G/CC 4 1 68 28 8 DHO3 MWD060 G/CC 4 1 68 32 9 DHO4 MWD060 G/CC 4 1 68 36 10 DHO2 MWD060 G/CC 4 1 68 40 11 CALN MWD060 IN 4 1 68 44 12 PEF1 MWD060 B/E 4 1 68 48 13 PEF MWD060 B/E 4 1 68 52 14 PEF3 MWD060 B/E 4 1 68 56 15 PEF4 MWD060 B/E 4 1 68 60 16 PEF2 MWD060 B/E 4 1 68 64 17 GR MWD060 API 4 1 68 68 18 FET MWD060 HR 4 1 68 72 19 RPX MWD060 OHMM 4 1 68 76 20 RPS MWD060 OHMM 4 1 68 80 21 RPM MWD060 OHMM 4 1 68 84 22 RPD MWD060 OHMM 4 1 68 88 23 ROP MWD060 FPH 4 1 68 92 24 FCNT MWD060 CP30 4 1 68 96 25 NCNT MWD060 CP30 4 1 68 100 26 NPHI MWD060 PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12062 12564 12313 1005 12062 12564 RHO]. MWD060 G/CC 1.601 2.825 2.39709 667 12077 12490.5 RHOB MWD060 G/CC 2.087 2.802 2.42234 832 12077 12492.5 RHO3 MWD060 G/CC 2.189 2.72 2.39257 543 12077 12490.5 RHO4 MWD060 G/CC 2.058 2.755 2.40093 591 12077 12490.5 RHO2 MWD060 G/CC 2.161 2.734 2.42944 644 12077 12492.5 DHO1 MWD060 G/CC -0.059 0.565 0.0861124 667 12077 12490.5 DRHO MWD060 G/CC -0.047 0.568 0.130719 832 12077 12492.5 DHO3 MWD060 G/CC -0.007 0.425 0.193609 562 12067.5 12490.5 DHO4 MWD060 G/CC -0.014 0.503 0.128646 591 12077 12490.5 DHO2 MWD060 G/CC -0.01 0.631 0.297436 644 12077 12492.5 CALN MWD060 IN 6.02 7.52 6.3948 483 12077 12490.5 PEF1 MWD060 B/E 1.33 5.19 1.90713 672 12077 12491 PEF MWD060 B/E 1.43 5.66 1. 99064 832 12077 12492.5 PEF3 MWD060 B/E 1.4 3.24 1. 95194 556 12077 12491 PEF4 MWD060 B/E 1.3 3.24 1. 95153 621 12077 12491 PEF2 MWD060 B/E 1.42 3.12 2.03587 658 12077 12492.5 GR MWD060 API 12.72 90.75 26.8728 832 12090 12505.5 FET MWD060 HR 0. 93 23.19 4.8385 832 12097 12512.5 RPX MWD060 OHMM 5. 68 57.92 15.5221 832 12097 12512.5 RPS MWD060 OHMM 6.44 50.02 16.5002 832 12097 12512.5 RPM MWD060 OHMM 7.44 51.13 17.5272 832 12097 12512.5 RPD MWD060 OHMM 8.74 57.43 19. 6967 832 12097 12512.5 ROP MWD060 FPH 0 274.36 66.075 818 12155.5 12564 FCNT MWD060 CP30 293.6 2343.89 867.364 832 12062 12477.5 NCNT MWD060 CP30 17586 45464.2 30322.2 832 12062 12477.5 NPHI MWD060 PU 7. 97 30.06 18.5746 832 12062 12477.5 First Reading For Entire File 12062 Last Reading For Entire File 12564 File Trailer Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.007 Physical EOF File Header Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNPS 12478.0 13303.0 TNFA 12478.0 13303.0 TNNA 12478.0 13303.0 PERQ 12486.5 13308.0 DCBQ 12491.0 13317.0 CDRQ 12491.0 13307.5 DCRQ 12491.0 13307.5 CDBQ 12491.0 13317.0 DCLQ 12491.0 13307.5 AHSI 12491.0 13317.0 CDLQ 12491.0 13307.5 PELQ 12491.5 13308.0 PEBQ 12491.5 13317.0 ADCL 12493.0 13317.0 DCTQ 12493.0 13307.5 PETQ 12493.0 13308.0 ACDL 12493.0 13317.0 CDTQ 12493.0 13307.5 APEL 12493.0 13317.0 DGRC 12506.0 13330.0 R39P 12513.0 13337.0 R27P 12513.0 13337.0 R09P 12513.0 13337.0 EWXT 12513.0 13337.0 R15P 12513.0 13337.0 ROPA 12564.5 13395.0 $ LOG HEADER DATA DATE LOGGED: 24-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 13395.0 TOP LOG INTERVAL (FT) : 12564.0 BOTTOM LOG INTERVAL (FT) : 13395.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 88.5 MAXIMUM ANGLE: 91.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 268169 CTN COMP THERMAL NEUTRON 274120 EWR4 Electromag Resis. 4 108711 ALD Azimuthal Litho-Dens 193135 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.70 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 MUD CHLORIDES (PPM) : 11500 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .300 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .111 201.4 MUD FILTRATE AT MT: .280 70.0 MUD CAKE AT MT: .320 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MWD070 G/CC 4 1 68 4 2 RHOB MWD070 G/CC 4 1 68 8 3 RHOS MWD070 G/CC 4 1 68 12 4 RHO4 MWD070 G/CC 4 1 68 16 5 RHO2 MWD070 G/CC 4 1 68 20 6 DHO1 MWD070 G/CC 4 1 68 24 7 DRHO MWD070 G/CC 4 1 68 28 8 DHO3 MWD070 G/CC 4 1 68 32 9 DHO4 MWD070 G/CC 4 1 68 36 10 DHO2 MWD070 G/CC 4 1 68 40 11 CALN MWD070 IN 4 1 68 44 12 PEF1 MWD070 B/E 4 1 68 48 13 PEF MWD070 B/E 4 1 68 52 14 PEF3 MWD070 B/E 4 1 68 56 15 PEF4 MWD070 B/E 4 1 68 60 16 PEF2 MWD070 B/E 4 1 68 64 17 GR MWD070 API 4 1 68 68 18 FET MWD070 HR 4 1 68 72 19 RPX MWD070 OHMM 4 1 68 76 20 RPS MWD070 OHMM 4 1 68 80 21 RPM MWD070 OHMM 4 1 68 84 22 RPD MWD070 OHMM 4 1 68 88 23 ROP MWD070 FPH 4 1 68 92 24 FCNT MWD070 CP30 4 1 68 96 25 NCNT MWD070 CP30 4 1 68 100 26 NPHI MWD070 PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 12478 13395 12936.5 1835 12478 13395 RHO1 MWD070 G/CC 2.124 2.884 2.34359 1567 12491 13317 RHOB MWD070 G/CC 2.18 2.844 2.36511 1649 12493 13317 RHOS MWD070 G/CC 2.134 2.721 2.35856 1454 12491 13307.5 RHO4 MWD070 G/CC 2.139 2.747 2.35874 1597 12491 13307.5 RHO2 MWD070 G/CC 2.091 2.709 2.39696 1429 12493 13307.5 DHO1 MWD070 G/CC -0.083 0. 609 0.0171602 1567 12491 13317 DRHO MWD070 G/CC -0.044 0.204 0.0594906 1649 12493 13317 DHO3 MWD070 G/CC -0.016 0.583 0.0982352 1454 12491 13307.5 DHO4 MWD070 G/CC -0.081 0.299 0.0692711 1597 12491 13307.5 DHO2 MWD070 G/CC 0.004 0.544 0.217798 1429 12493 13307.5 CALN MWD070 IN 5.77 7.29 6.0874 1444 12491 13317 PEF1 MWD070 B/E 1 5. 96 1.77655 1578 12491.5 13317 PEF MWD070 B/E 1.12 5.86 1.86132 1649 12493 13317 PEF3 MWD070 B/E 1.16 4 .75 1.86354 1456 12491.5 13308 PEF4 MWD070 B/E 0.8 4.45 1.8355 1610 12486.5 13308 PEF2 MWD070 B/E 1.24 5.4 1.97576 1432 12493 13308 GR MWD070 API 13.7 57.88 19.6722 1649 12506 13330 FET MWD070 HR 0.79 30.54 3.586 1649 12513 13337 RPX MWD070 OHMM 4.45 38.74 10.6944 1649 12513 13337 RPS MWD070 OHMM 4. 93 35.44 11.3368 1649 12513 13337 RPM MWD070 OHMM 5.55 34.86 12.2782 1649 12513 13337 RPD MWD070 OHMM 5. 69 33.76 13.3236 1649 12513 13337 ROP MWD070 FPH 2. 91 191.86 50.0354 1662 12564.5 13395 FCNT MWD070 CP30 520.75 1961.36 948.218 1651 12478 13303 NCNT MWD070 CP30 24095.9 42425.6 32060.3 1651 12478 13303 NPHI MWD070 PU 9.19 25.76 18.4547 1651 12478 13303 First Reading For Entire File 12478 Last Reading For Entire File 13395 File Trailer Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.008 Physical EOF File Header Service name STSLIB.008 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNFA 13303.5 14202.0 TNNA 13303.5 14202.0 TNPS 13303.5 14202.0 ACDL 13317.5 14217.0 ADCL 13317.5 14217.0 APEL 13317.5 14217.0 PEBQ 13317.5 14217.0 CDBQ 13317.5 14217.0 DCBQ 13317.5 14217.0 DGRC 13330.5 14230.0 PERQ 13332.0 14217.0 CDRQ 13332.5 14217.0 DCRQ 13332.5 14217.0 AHSI 13337.0 14217.0 DCLQ 13337.0 14217.0 PETQ 13337.0 14217.0 PELQ 13337.0 14217.0 CDLQ 13337.0 14217.0 R15P 13337.5 14237.0 R09P 13337.5 14237.0 DCTQ 13337.5 14217.0 R39P 13337.5 14237.0 R27P 13337.5 14237.0 EWXT 13337.5 14237.0 CDTQ 13337.5 14217.0 ROPA 13395.5 14295.0 LOG HEADER DATA DATE LOGGED: 27-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 14295.0 TOP LOG INTERVAL (FT) : 13395.0 BOTTOM LOG INTERVAL (FT) : 14295.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 88.6 MAXIMUM ANGLE: 92.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 268169 CTN COMP THERMAL NEUTRON 274120 EWR4 Electromag Resis. 4 108711 ALD Azimuthal Litho-Dens 193135 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.60 MUD VISCOSITY (S) : 45.0 MUD PH: 9.1 MUD CHLORIDES (PPM) : 11500 FLUID LOSS (C3) : 7.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .280 68.0 MUD AT MAX CIRCULATING TERMPERATURE: .096 212.0 MUD FILTRATE AT MT: .400 68.0 MUD CAKE AT MT: .210 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MWD080 G/CC 4 1 68 4 2 RHOB MWD080 G/CC 4 1 68 8 3 RHOS MWD080 G/CC 4 1 68 12 4 RHO4 MWD080 G/CC 4 1 68 16 5 RHO2 MWD080 G/CC 4 1 68 20 6 DHO1 MWD080 G/CC 4 1 68 24 7 DRHO MWD080 G/CC 4 1 68 28 8 DHO3 MWD080 G/CC 4 1 68 32 9 DHO4 MWD080 G/CC 4 1 68 36 10 DHO2 MWD080 G/CC 4 1 68 40 11 CALN MWD080 IN 4 1 68 44 12 PEF1 MWD080 B/E 4 1 68 48 13 PEF MWD080 B/E 4 1 68 52 14 PEF3 MWD080 B/E 4 1 68 56 15 PEF4 MWD080 B/E 4 1 68 60 16 PEF2 MWD080 B/E 4 1 68 64 17 GR MWD080 API 4 1 68 68 18 FET MWD080 HR 4 1 68 72 19 RPX MWD080 OHMM 4 1 68 76 20 RPS MWD080 OHMM 4 1 68 80 21 RPM MWD080 OHMM 4 1 68 84 22 RPD MWD080 OHMM 4 1 68 88 23 ROP MWD080 FPH 4 1 68 92 24 FCNT MWD080 CP30 4 1 68 96 25 NCNT MWD080 CP30 4 1 68 100 26 NPHI MWD080 PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13303.5 14295 13799.3 1984 13303.5 14295 RHO1 MWD080 G/CC 2.108 2. 941 2.32207 1631 13317.5 14217 RHOB MWD080 G/CC 2.145 2.986 2.35425 1800 13317.5 14217 RHO3 MWD080 G/CC 2.123 2.719 2.3279 1385 13337 14217 RHO4 MWD080 G/CC 2.135 2.841 2.33888 1494 13332.5 14217 RHO2 MWD080 G/CC 2.138 2.89 2.35835 1322 13337.5 14217 DHO1 MWD080 G/CC -0.127 0.279 0.022176 1631 13317.5 14217 DRHO MWD080 G/CC -0.162 0.34 0.0607106 1800 13317.5 14217 DHO3 MWD080 G/CC -0.019 0.279 0.0969567 1385 13337 14217 DHO4 MWD080 G/CC -0. 14 0.231 0.0633527 1494 13332.5 14217 DHO2 MWD080 G/CC -0.055 0.369 0.197408 1322 13337.5 14217 CALN MWD080 IN 5.79 7.35 6.08276 1310 13337 14217 PEF1 MWD080 B/E 0. 93 6.71 1. 92498 1633 13317.5 14217 PEF MWD080 B/E 1.08 6.73 2.07399 1800 13317.5 14217 PEF3 MWD080 B/E 1.07 5.25 1.92095 1394 13337 14217 PEF4 MWD080 B/E 1.02 6.12 2.00522 1513 13332 14217 PEF2 MWD080 B/E 1.14 7.3 2.04389 1329 13337 14217 GR MWD080 API 12.04 27.51 18. 6285 1800 13330.5 14230 FET MWD080 HR 0.77 63.95 6.04028 1800 13337.5 14237 RPX MWD080 OHMM 2.04 21.85 5.77659 1800 13337.5 14237 RPS MWD080 OHMM 1. 96 22.33 6.24057 1800 13337.5 14237 RPM MWD080 OHMM 2.2 28.92 7.25674 1800 13337.5 14237 RPD MWD080 OHMM 2.46 28.15 8.24523 1800 13337.5 14237 ROP MWD080 FPH 2.2 244.24 46.26 1800 13395.5 14295 FCNT MWD080 CP30 528.76 2150.43 750.421 1798 13303.5 14202 NCNT MWD080 CP30 26072.7 43514.6 29985 1798 13303.5 14202 NPHI MWD080 PU 8. 9 26.02 21.4182 1798 13303.5 14202 First Reading For Entire File 13303.5 Last Reading For Entire File 14295 File Trailer Service name STSLIB.008 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.009 Physical EOF File Header Service name STSLIB.009 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 7 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TNFA 10622.0 11615.0 TNPS 10622.0 11615.0 TNNA 10622.0 11615.0 AHSI 10635.0 11629.0 DCRQ 10636.0 11629.0 CDBQ 10636.0 11629.0 CDLQ 10636.0 11629.0 CDRQ 10636.0 11629.0 PERQ 10636.0 11629.0 PETQ 10636.0 11629.0 DCLQ 10636.0 11629.0 ADCL 10636.0 11629.0 CDTQ 10636.0 11629.0 PEBQ 10636.0 11629.0 DCTQ 10636.0 11629.0 PELQ 10636.0 11629.0 DCBQ 10636.0 11629.0 APEL 10636.0 11629.0 ACDL 10636.0 11629.0 DGRC 10648.5 11642.0 EWXT 10655.5 11649.0 R15P 10655.5 11649.0 R39P 10655.5 11649.0 R27P 10655.5 11649.0 R09P 10655.5 11649.0 RSPD 10716.0 11705.5 LOG HEADER DATA DATE LOGGED: 24-NOV-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 88.2 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 13395.0 TOP LOG INTERVAL (FT) : 10716.0 BOTTOM LOG INTERVAL (FT) : 11706.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 88.5 MAXIMUM ANGLE: 91.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY 268169 CTN COMP THERMAL NEUTRON 274120 EWR4 Electromag Resis. 4 108711 ALD Azimuthal Litho-Dens 193135 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 6.125 DRILLER'S CASING DEPTH (FT) : 10536.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 8.70 MUD VISCOSITY (S) : 47.0 MUD PH: 8.9 MUD CHLORIDES (PPM) : 11500 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : .300 70.0 MUD AT MAX CIRCULATING TERMPERATURE: .111 201.4 MUD FILTRATE AT MT: .280 70.0 MUD CAKE AT MT: .320 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RHO1 MAD071 G/CC 4 1 68 4 2 RHOB MAD071 G/CC 4 1 68 8 3 RHO3 MAD071 G/CC 4 1 68 12 4 RHO4 MAD071 G/CC 4 1 68 16 5 RHO2 MAD071 G/CC 4 1 68 20 6 DH01 MAD071 G/CC 4 1 68 24 7 DRHO MAD071 G/CC 4 1 68 28 8 DH03 MAD071 G/CC 4 1 68 32 9 DH04 MAD071 G/CC 4 1 68 36 10 DH02 MAD071 G/CC 4 1 68 40 11 CALN MAD071 IN 4 1 68 44 12 PEF1 MAD071 B/E 4 1 68 48 13 PEF MAD071 B/E 4 1 68 52 14 PEF3 MAD071 B/E 4 1 68 56 15 PEF4 MAD071 B/E 4 1 68 60 16 PEF2 MAD071 B/E 4 1 68 64 17 GR MAD071 API 4 1 68 68 18 FET MAD071 HR 4 1 68 72 19 RPX MAD071 OHMM 4 1 68 76 20 RPS MAD071 OHMM 4 1 68 80 21 RPM MAD071 OHMM 4 1 68 84 22 RPD MAD071 OHMM 4 1 68 88 23 RAT MAD071 FPH 4 1 68 92 24 FCNT MAD071 CP30 4 1 68 96 25 NCNT MAD071 CP30 4 1 68 100 26 NPHI MAD071 PU 4 1 68 104 27 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10622 11705.5 11163.8 2168 10622 11705.5 RHO1 MAD071 G/CC 2.106 3.11 2.34651 1987 10636 11629 RHOB MAD071 G/CC 2.146 3.05 2.37305 1987 10636 11629 RHO3 MAD071 G/CC 2.118 2.946 2.3493 1987 10636 11629 RHO4 MAD071 G/CC 2.145 3.032 2.35917 1987 10636 11629 RHO2 MAD071 G/CC 1.879 3.074 2.37176 1987 10636 11629 DH01 MAD071 G/CC -0.059 0.442 0.0532989 1987 10636 11629 DRHO MAD071 G/CC -0.088 0.475 0.0741726 1987 10636 11629 DH03 MAD071 G/CC -0.142 0.498 0.106085 1987 10636 11629 DH04 MAD071 G/CC -0.09 0.328 0.0990991 1987 10636 11629 DH02 MAD071 G/CC -0.072 0.588 0.184082 1987 10636 11629 CALN MAD071 IN 5.76 9.03 6.17155 1989 10635 11629 PEF1 MAD071 B/E 1.01 6.72 1.99353 1987 10636 11629 PEF MAD071 B/E 1.14 7.38 2.07598 1987 10636 11629 PEF3 MAD071 B/E 1.08 6.71 2.02283 1987 10636 11629 PEF4 MAD071 B/E 1.17 5.71 2.04551 1987 10636 11629 PEF2 MAD071 B/E 1.32 6.18 2.09794 1987 10636 11629 GR MAD071 API 10.15 355. 94 36.8644 1988 10648.5 11642 FET MAD071 HR 106.83 193. 94 143.648 1988 10655.5 11649 RPX MAD071 OHMM 1.15 110. 67 10.8125 1988 10655.5 11649 RPS MAD071 OHMM 1.43 105.75 12. 6197 1988 10655.5 11649 RPM MAD071 OHMM 1.48 108.3 15.2959 1988 10655.5 11649 RPD MAD071 OHMM 0. 95 124.01 18. 9022 1988 10655.5 11649 RAT MAD071 FPH 13. 16 389.36 261.565 1980 10716 11705.5 FCNT MAD071 CP30 285. 9 3398.28 787. 925 1987 10622 11615 NCNT MAD071 CP30 20530.3 49273 29655.7 1987 10622 11615 NPHI MAD071 PU 5.13 38.43 20.7989 1987 10622 11615 First Reading For Entire File 10622 Last Reading For Entire File 11705.5 File Trailer Service name STSLIB.009 Service Sub Level Name Version Number 1 0 0 Date of Generation 11/02/23 Maximum Physical Record65535 File Type LO Next File Name STSLIB.010 Physical EOF Tape Trailer Service name LISTPE Date 11/02/23 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 11/02/23 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File