Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout176-048 4 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM',/,' , REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 176-048 3. Address: P.O.Box 196612 Anchorage, Development DJ Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number 50-029-20216-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number PBU 09-06 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVED 11.Present Well Condition Summary: Total Depth: measured 9655 feet Plugs measured feet 1 �lE 6 true vertical 9162 feet Junk measured feet l i !r T ;7 Effective Depth: measured 9527 feet Packer measured 7988 feet true vertical 9036 feet Packer true vertical 7555.34 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 83 20"94#H-40 34-117 34-117 1530 520 Surface 2683 13-3/8"72#MN-80 33-2715 33-2715 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth. See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 5-1/2"17#13Cr80 28-8086 28-7647 Packers and SSSV(type,measured and See Attachment - See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 1 Treatment descriptions including volumes used and final pressure: scale DEC 1 4 ZU 17, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 332 1180 14367 1792 239 Subsequent to operation: On Line-Not Teste 1787 229 14.Attachments:(required per 20 AAC 25.070.25.071,&25.293) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development IZ Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Il Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stechauner,Bernhard Contact Name: Stechauner,Bernhard Authorized Title: FS2 Lead PE Contact Email: Bernhard.Stechauner@bp.com Date: (0/(6/ PContact Phone: +1 907 564 4594 Authorized Signature: Form 10-404 Revised 04/2017 Submit Original OnlyIL1°/' ?11 � /O/i,7RBDrSLfL1 / 2u17 • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary October 11, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Addition of Perforations for Well 09-06, PTD # 176-048. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 ID 41 Q o 0 0 0 0 0 o 0 RN I� O CO CO M V. N (b _ L() CO O N O f� O O N O N M ct Lf) <zt v- N- CO 0 y o 0 0 0 0 0 0 0 MCOLnr— InN CD 't 3 Lf) M N- CD Cp N m .- LC) Lf) CO CO CO v- CO Lf) Lf) CO CO O N- Lf) N-- 1-- CO CO L) v In In v MMOvCO `- N N N N C0 O) O) N Lf) 6) CO CO CO V CO O CO Cr) LO O CO CO Cr) CO CO v- CO co N- O N N N N Imo- CO C Q) LC) LU co CO O) 0) CO CO M LO v V V CO CO CO CO Lf) CD O N N N N Cb O) 0) CO o o 4a to Q C Lf) 0) CO 0) CO CO O CO M LO •c: O) CO • O) C,) CO CO CO M Ma N N N CO CO CI— a. O °o° O Ln O O O CO 00 � Z10 ' UCU C3 2 J Z O Z (nC9M .cr• fA p) v Z U ° � � - N • LI eo In 0) ? o) , Cn Li) CO CO CO 0) Lf) O Lf) Lf) C CO COv v V V (1) r O N N `- CO v- v- CO W W W W H H H H a)0 QQQQ = HW 0 0 0 0 U O D cC CC CC CY C 0 Z Z W W W W W W m O 0 H H H H Z Z 0 U w Z Z Z Z J J H , • o N N _ m Lo O O CA 0.) Lo co V' co t- co N �. CA N 6) L CO CO CO N CO h LO N CA 00 CO N- Lo LO LO in co a N- N Lo 0 A- r- N tip N- Lo O r 00 N- O o 0 () V' N y N N- O) O N co ' Lo N- Co CO co C)) O O 0) LU LU N ❑ N- N- N- CO CO CO CO ;--,,-,- CO CO CO CO CO CO O) CO 0) O) C) ❑ CO CO CO CO CO CO LU CO CO CO CO CO CO CO CO CO O > H a O H L .cr - LO o) O CO LO M �' M Co CO N N o) CO t N Lo CO M N CO LO Lo Co O O) CO CO CO LO Lo O) Lo N a. O M (Ni N- O ,- M (NI a) Lc) O N- O CA d' 0 y N M N 6) O N M V LU (or- CD 00 CA D O O CO LO CO W ❑ N- N N- N- Co CO Co Co Cb 00 00 00 CO CO CO O O 6) o) O) > p cocococomcococo mmcoaoLLULU oLoL 0 > 2 I- w 0 cc W Z o 0 CO w 0 H H J a W y Q QY O 0 0 Y- 03 O O W Y Y H f t t O CO CO O O A- CO CO Lf) O CO N- O c- N - O Lo t J J J Q < (/) W Cr -' 72 ,- (00000 = iN CO 'Sr V CO I` N- N- CO 63 O) CD LLo r O Q < < w a a Z C y N N N N CO CO) O O O O CO C)CO CO CO CO CO CO CO CO CO CO V V LO 0_ U_ 0_ J W W 0 J 0 O ❑ CO) a) 6) O) O) 6) o) ) O O ) O O J J Z Z Z C 6) CO ❑ E c. y 2 2 = Z ❑ ❑ p H p O O O W cit Z p Z W W W a H H < J < v CO2 2 O co (n (n (n (n CO 4-0 4-4 Cn O a < 0 H C '= a N- O O o O LO CO O N - A- CO CO L - .- N- 0 c- CO O Lo O N LU 00 N M V In CO N- .- a0 00 CA O N Lo O My NN N N N CO CO CO CO CO CO CO COCO CO CO CO ++ •'• m C) co CA CA O CT o) O7 O CA 0 0 0 0 0 0 0 0 0 O) (13aC L 0) - - tY Y 1 H OH Q J a 1.- 2 O (n co co (n co U CL y O U c LiLL_ LL. N LL N NL NL a u_ L.L. a s LL_ LL LL Cl Cl a s .2R a a a a a N5 a a a a a a a a a a a a a a `y a' CCCCv) C cn < < m < < m m < < < m CO m m a 0 t 0) a 0 W J _ J H D W H 0 i0 C) C c- ti (` t` N I---- T--- 0 a co Lu J O rn O7 O) O) 6) CA C- <- r r .-- N- V- CO CO CO ❑ ❑ ❑ p ;--,Z p \ a C) CA 0 0 0 0 0 0 0000 W LL p c- c- r N N N N N N O N N N N 0 0 0 Z w a a < W W 6) 0) o N N N N O W N N w t0 N N N r r r r N O O O O N N N ❑ a O CW'J -I W W CC a O r r r .- O O) 0) O) 0) 0 M 03 0) 0) O) M M M < ❑ ❑ ❑ J J ❑ ❑ CC a O m ❑ fY NY J J O O w W Q Q 0 ¢) w a co co a W' o E Co Z co co co co co co co co co co co cU LU co co co LU LU co co 3 0 0 0 0 0 0 0 0 0 0 0 co 0 0 0 0 0 0 0 0 W N OC W � rnrnornrnrnrnrnrnrnrnrnrnrno) rnrnrnrnrnrn m a a a 0 -' 0 0 W a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C) 0 0 0 0 < < CO CO W Li (n co a s • • Packers and SSV's Attachment PBU 09-06 SW Name Type MD TVD Depscription 09-06 PACKER 2281.58 2281.51 9-5/8" BOT External CSG PKR 09-06 TBG PACKER 7987.87 7555.34 5-1/2" Baker S-3 Packer . 0 !I / 0 0 E a n I L o b 0 Z Cl) < < \ & @ 2 \ E E ƒ E w 0) ,.., - 0 7 ± 0 . C C z / I I 2 0 LR Lw ± ± IZR U_ 0 a O w 02 0 R D O L 2m or- I i / , a_ ® m © @ 2 N E L U) lla + �� & _ < O Z ƒ IS / IWO 0 0WO ± @ c 2 R ƒ WZ LL< \ \ L 0 m / ƒ co IOD ± I0IH H _ 2 Oo 0 CB 00 \ \ 0001 W 00X - D ± o >- \ I / 2 t Z I \ \ / ;z17 .-' 1C E 2 / @ /_ 0 LIJ \ w \ O I O 0 ii O L E o c 7 / 5 - o / \ § � � � CL- 0CDa � H D O ± @ 0 E ± m ± m ± Z G I ® z f O w « Z I r o '1-T-;, 2 ‹ I I O — m 0 '5 = 0 E ® .. e I I' mr.. m /- & I x Z E w � 20 \ / / / 0 QOH (0 0OH - H. 0 / \ 2 R e HH. p0 ƒ \ \ / / \ 70 / \ / h ƒ \ H I to. / / \ / R \ / @E U) 000 Q 092. 1- 0 / / / / EC % \ / 0D / < \ Ce < \ _ \ f \ ƒ � z O _ � \ / \ >I comes CCb « b = c L aS E 2 x « / / \ \ \ / / < \ / 0 0 6 » Q c ± O 2 / ± a © : 2a ® LI-1- W 2 ‹ & / \ DZ0y Zw / \ o I / \ \ 0 - LU I H O \ � F- UJ O E ƒ � W � - < CRUX \ 0 <--1 < ct 00 a2 ± cc ® U � 3a QE ± E - E < 0 ° w w ® ? = w N w & i * A d / m cA 5 Z 0 / - - D ±Z / Z Q Z Z Z Z < ± 0 / n = u 2 * < D D L D I ± O - 9 : / ± I R : : ± : : ± I 0 m ± E E _. : a 2 H N. ¥ ¥ co H d\ d / \ 0 N- ® / / \ \ < TREE.= CAMERON CAN 6-3/8" 1PE3_LHE4D= FMC Ell SA TES: ""CHROME TBG&LNR"" ACTUATOR= OTIS 09-06 0KB ELEV = 54' l ) 30' -IT x 5-112*XO,D=4-892 BF,ELB/= 0 .1 \ ! `4 t KOP- 3401' Max Angie= 30• 420(Y 4 ¢ 4I 78' -90' -I5-1/2"W0 H2 PATCH,D=2-90"(10/30/08) Datum MD= 9347' 4 L i, Ovum 1V D= 8800 3SI 4 1 I 0 2088' H 5-1/2"HES X NP,D=4.562- 9-5/8•CSG,40#,L-80 BTC,O=8.835" MEM ,! Mt 9-5/8"FOC 2330' ■ 4 MOW2162' H9-518"HES ES CEMENTER,O=8.835 9-5/8"FOC - 2461' ...• GAS LFT MANDRELS 13-3/8"CSG,72#,MN-80,BUTT.O=12.347" -} 2716' i ST MD TVD DEV TY FE VLV LATCH PORT DATE 4 3278 3275 9 MMG 006E RK 16 01/03/08 3 5617 5413 27 AAG DONE FE 16 01/03/08 1 2 6848 6515 26 MAG SO RK 24 01/03/08 Minimum ID =2.81" @ 8073' 1 7821 7400 23 NMG DMY RK 0 04/22/06 5-1/2" x 3-1/2" X NIPPLE REDUCER 7967• -I5-1/2-FES xMP,0=4.562' 1 1 7988' 9-5/8"X 5-1/2"BKR S-3 PKR,D=4.750• 1 8013' --i 5-1/2"FES X NP,D=4.562' 5-1/2'mG,17#,13-CR YAM TOP,- 8086' .0232 b pf,ID=4.892"• 8073' -15-1/T XN NP,D=4.455" TOP OF 5"LNR-TE$ACK H 8149' 111: ►\-r.1) $073' �--{3-112'X NP RED,D=2.81"(01!04108) TOP OF 7"LNFI -{ 8458' 9-5/8"CSG,47#, AN-80/SOO-95, H 8814' / 8086' H5-112" V4T EG.D=4.892" .0732 bpf,D=8.681" J-I B_MO TT NOT LOG/ PERFORATION& AARY REF LOG: 8HCS CR 08/03/76 - 8498' }--BOT TEBACK,D=? ANGLE AT TOP FB F: 11 @ 9207 Tote:Refer b Abduction DB for historical pert data a 8604' -{95/8"x 7•BOT LW,D=? SIZE SW INTERVAL Opn/Sgz DATE 3-3/8" 1/2 9207-9214 0 10/27/91 3-3(8" r 4 9216-9236 O 11/30/91 , 3-318" 112 9220-9283 0 10/27/91 3-318" 1/2 9223-9263 0 10/28/91 3-3/8' r 4 9236-9283 0 10/27/91 3-318" 1/2 9243-9263 0 10/28/91 3-3/8" 1/2 9288-9310 O 11/09/91 ✓ 4 9310-9320 S 10/16191 2-1/2' r 6 9327-9343 0 09/11/17 ✓ 4 9331-9346 S 10/16/91 3-3/8" ' 4 9354-9357 0 11/30/91 3-3/8" r 4 9357-9367 0 11/29191 2-1/2" r 6 9358-9370 0 09111/17 Ir 4 9365-9371 S 10/16/91 3-3/8" r 4 9377-9386 0 11/29/91 2-1/2' r 6 9381-9391 0 0911017 ✓ 4 9389-9397 S 10116191 3-3/8" r 4 9428-9450 O 10/27/91 J r 4 9450-9455 S 10/16191 '4�4�4�4�4v4re PBTI3 1 962T 3-3/8" r 8 9475-9494 0 1027/91 44144444444144 3-3/8" r 8 9494 9514 0 10/27/91 �4�4�4�4�4�4�4 44444444444444444 5'TIEBACK L11 ,18#,13CR-80,.0177 bpf,613=4.276' H 9649' 444444444444444 W 4.41401/44 j Ta H 9666' 7"LNR,290,N-80,.0371 bpf,D=6.182" J--} 9648' DATE REV BY CONSENTS DATE REV BY COMFITS Fi4J1)HOE BAY UNTF 08!12!78 ROWAN 34 ORIGNIAL COMPLETION 10/13/08 JC4APJC PULL UFFR R( /(10/08/08) WILL 09-06 101821/91 AUDI 4 MO 11/21/08 JC&ITLH SET LI4EFt PKR(1 ) FEFS4IT No:'1760480 04124108 DOYON 14 RWO 01/22116 MRDTTLH SET R_UG(01/11/16) API No: 50-029-20216-00 04/30106 TAM./PJC DRLG DRAFT CORRECTIONS 03/09116 TBDIJMD PULL/)PLUG(03102/16) SEC 1,T10N,R15E,3926.34'FB..&3542.45'FW 01/09/18' DAV/SV GLV(70(01/03/08) 09/12/17. BT14,M13 ADPEFFS(09110-11/17) 01/08/08 J&FIPJC SET LOVER PKR(01/22/08) BP E2tptoratlon(Atka) • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Thursday, September 28, 2017 2:09 PM To: AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OIL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL;Chamansingh,Ann Marie;G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Danielle H; Stechauner, Bernhard; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA);AK, GWO Well Integrity Well Information Subject: OPERABLE: Producer 09-06 (PTD# 1760480)Anomalous inner annulus repressurization All, Producer 09-06 (PTD#1760480)was made under evaluation on 9/20/17 for having anomalous inner annulus re- pressurization after being shut in on 09/19/17.On 09/26/17 Fullbore performed a passing CMIT-TxIA to 2694 psi and passing MIT-T to 2730 psi post gas lift change out.The passing pressure test confirms two competent well barriers.At this time the well is reclassified as Operable. Please respond with any questions, Andrew Ogg Well Integrity EngineerKAMM 1,1 BP Global Wells Organization-Alaska Office:907-659-8110 Cell:307-399-3816 From: AK, • •' • -a rity Engineer Sent: Wednesday, September -:, 017 3:56 PM To: AK, OPS EOC Specialists; AK, OPS - 'S Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS FS2 OSM; AK, RES GPB East Wells Opt Engr; AK, • GPB West Wells Opt Engr; AKOpsProdEOCTL; Chamansingh, Ann Marie; G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Da ': le H; Stechauner, Bernhard; 'Regg,James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integre • AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, R :a• Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'conno , atherine; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras J; 'chris.wallace@alaska.gov' Subject: UNDER EVALUATION: Producer 09-06 (PTD# 1760480)Anomalous inn- annulus repressurization All, Producer 09-06(PTD#1760480)was reported to have anomalous inner annulus repressurizatio• after being shut in on 9/19/17. The IA repressurization above gas lift supply pressure indicates a potential failure of one more well barrier. The well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and rep.' . Plan Forward: 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, September 20, 2017 3:56 PM To: AK, OPS EOC Specialists;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OIL;AK, OPS FS2 Field OTL;AK, OPS FS2 OSM;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Chamansingh,Ann Marie; G GPB FS2 Drillsites; Nottingham, Derek; Ohms, Danielle H; Stechauner, Bernhard; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel, Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer 09-06 (PTD# 1760480)Anomalous inner annulus repressurization Attachments: 09-06.pdf All, Producer 09-06 (PTD#1760480)was reported to have anomalous inner annulus repressurization after being shut in on 9/19/17. The IA repressurization above gas lift supply pressure indicates a potential failure of one or more well barrier. The well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repair. Plan Forward: 1. Slickline—Change out SO GLV, Set TTP 2. Fullbore—MIT-T 3. Well Integrity Engineer—Additional diagnostics as needed. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068saws SEP 2 5 2017, WO 1 STATE OF ALASKA • . ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 • Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull HEX Plug Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 176-048 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20216-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-06 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 9655 feet Plugs measured feet A n true vertical 9162 feet Junk measured feet Mt�A 2 9 2016 Effective Depth: measured 9527 feet Packer measured 7988 feet true vertical 9036 feet Packer true vertical 7555.75 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 83 20"94#H-40 35-118 35-118 1530 520 Surface 2683 13-3/8"72#MN-80 35-2717 35-2717 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet ,i".' 's r ;et-, Tubing(size,grade,measured and true vertical depth) 5-1/2"17#13Cr80 29-8086 29-7647 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 45 1328 14821 1854 201 Subsequent to operation: 221 1114 16033 1867 231 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature jj/ /y Phone +1 907 564 4424 Date 3/29/16 Form 10-404 Revised 5/2015` " V� 4 1 Z/I t- /f_ Y/ ( RBDMS Lk/ MAR 31 2016 Submit Original Only • • NQ 0 0 0 0 0 c) 0 CD m ON N- C)) (0 00 O VN O Cfl O I` O I` O O N p NMct to N- (D U y 0 0 0 0 0 0 0 0 0 L (Y) 00 to I- to N CD NT 3 to 01 I- CX) r CO T-- 00 r tf) to (D CX) CD O" OD ti 00 I- to N- C)) O O I- v- CO - to NT (D u) Nt N N N N CO 0) O) I- CI I I I H to N- 0000 to to — (O CO to O M 0) co co co .- M () I,- O (V N N N I- OD a) O N- to N- 0) N- N O (D N CO v- to to to OD M M 00 tf) CO O S • N N N N cO D) C7) CO C) p i i I 1 1 1 1 1 Q o CD to L0 N- CO (V) 1.0 to O CA D) 00 co c7 v- (h co N.- to N _ N N N CO 00 CO I- a O Ot O O O tb (p CI? 00 O c O o O Q1 vr � JZOZ (/ 0? 01 2 N U a ° � a, Lc, 0N N to MCD1 O O O Lo In 00 O O I- ID CO (p Co') N N to O 10 tf) C 00 (flN N V O d N N ' O r- (b -J W W W W IY HHHH C H w 0 0 0 0 ULU LU LU W U c Ct cc cc Z Z W W W W W W m O D H H H H Z Z D O Z Z Z Z J J H • • a, m Cf) = m m O _ Lo M M _ CD N O N m t CD CO M N 00 N- N m M N- to to . C0 10CD _ N 10 O N- to N- 00 N- O ~ m N e> N N- 6) O N CO to N- CO CO 0) O en to CO N ❑ N- N- N- CO CO CO CO CO CO CO CO 0) 00 6) O) O CO OO CO CO CO CO m C0 00 00 00 00 O C0 O) I- a O I- 00 t — to m m to M M CD CD N (NO) M L N- CC) CO M N M to O O) M CD 10 to O to N a O M N f- O = N m to = f- O f- C3) V 0 O N CO N- O O (NI sZrCD N- CO 0) 0) O CO 1.0 OC) W ti N- f- CO CO CO CO CO CO CO CO 6) 0) O O) > O M O CD M M CO M CO M M M M O CO 00 CO O w 0 ❑• ❑ w z W w 0 w 0 e7 Q Q J 0 JJ JJ Y U O 0 0 W Y Y F- 2 y O CO 00 O O CD LO — CO N- o N- O 10 '1Y J J J ¢ ¢ W ++ a = CD M M N V CD ti N- OO 6) 6) 10 to < ¢ < w d d _Z C 0 N N N N cM CM M M M COM cM M 't V' to 00 UJ w w 0 _10 O 0) 0) 0) 0) 0) O) 0) 0) 0) m O O O Cr) m O _ _ _z z z 0 J J J ❑ 0 = ❑ ❑ d w fl 2 0 00 w z ~Q Z 00 t w w w a V (p 2 20c~i) wc¢ Cl)om M Oi Q01 a 6 ,2 C s f- 0 0 10 00 0 ,- CO to - - N- O CO O 10 a O N CD CO M .- M to CD N CO O m N to N- O O N N N N N M M CM CM M COM M ❑ O 6) 0) O) m O) O) C)) m m C)) CA O O 0 O a � L e) 2 0 N cn Cl) cn cn 0 a a, O 0 c • LL IL lL N IL N a. a_ a_ M a. a. M a. M a. Q Ctf:C (XW nmmmmmmmmmm 0 t a, a H • m O m m m m M M Cfl Cfl CO O Cfl CO Cfl co ❑ 0 m m O . . . . . MMM C 0000000000 z u_ L W O N N N N N N N N N N m O O O W W V N l� 0 N N N N N N (N N N N N NN ❑ a j U 11 00 W tL W Q O = = = = M M M M M M M M M M Z ❑ J J J J ¢ ~ J J w w O ¢ < a cwi) U- tL )) LL W a a e) E C0 Co CO CO CD CO CO CO CD CO CO CO CO CO C0 C0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LL N LL Cn i i i i i i i i i CL a. Cn O 0 0 W CL CI) m m m m O m O m m m m m O m m an d [l Cl_ J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 < ¢ m m w 1 Cl) cn a w • • Packers and SSV's Attachment PBU 09-06 SW Name Type MD TVD Depscription 09-06 PACKER 2287.79 2287.72 9-5/8" Open Hole Packer 09-06 TBG PACKER 7988.31 7555.75 5-1/2" Baker S-3 Packer • • 0 3 0 N c O II 0) -I 13 > 0 C a O Z 0 Q C M iu 0 � � � x, 00C v) E 2 /= ^ ° O 0 Q 1:315 < H �� � ma > __J E = a 15 tin co Lm F- 0 CD LL a) o (/) 0 Z or)< a F- o_ SCO CJ 4- 4- Z W W 0 0 0 0 O - p J 2E .Q ID O -- N Cl) a O Q N m 7 2E >) rn2E Z z > L 3 � -0w - (13 6, oo MCn O L ° ( 20 ao Qm aim Q m a' U N a = O N �-\ I— J o CL u) fA O O O > > V (n U) O oH ,- O o co C p C => U) N J M w > J -0 Q N c E05 N _ 15 ALL 2U) Ea o � 0 .0 a� �1 a N N _1E0 O V J J M (0 , v U) o - = N H m C C rn 00 C Q N co o f co ao O 26 w a� L < -0 E a C\1 ,,, a m N CV �l * 0 4_ : 2 H G) c0 N _m C) V *Q o) 0) a7 V * Et o * 0 H a m 73 U) JO0 toD � 000 (DI-Lc � H 0 O ~ O O N a' * O Et a' a' a' * No Z m * O 0 0 �i U E c ' W W * N W 0 W W W * _ cm* O m W a O * a Q Q N _J J_ c0 N J O J_ J_ J (0 N Q' O c'0 N J w * O o � E >— QQo NQF- QQQ oNa xv- NY Es * ...- m m a w * 7 �> m m N Z m m m m N Z W O O Z O _ W m m > L � co amaa .;:. Oa Wa. aa Li-) 0 =10_(0L10 2 cr> W ~ Q u_ p > Q N Q4, a a a cn a m a a a . > a N Z 3 c a' Q N � op 3 * °poop/) � oZ000 2E 00m3 W W a CL N (a U O --I X X 2 X X X X 0 = N a' O J J W A ENN o a1D j �1- - Z 04, 0ibi, i, Zr - 5C/) r ( Q z O N vN N O w N N N N O w N = w m m z O O NO u_ OC 0` CCW ---. .- -N N m LI- N > N N N CO m N a Z O 03 2 o E' Q F- Q > 30 03> EEi> 3> 3> -, -, ._W O -' :D D cA ,n o E a00 zQ owW ° a 1.0 o a cn II a cA cn w cA 0 (n cn (n W W o F- o � Q OC� zz � Wz = zzz » '-'" n b w L — Z ZZ _W Z_ Z Z N W p0 ? CO N a Q (n Z a' a' Z a' N a' a' a' F- - Z Es ~ ~ N 4, J * 0 0) - JQLoMZ . N XNM = ZZZZZZo N J II ~ sD A- 00 W (DWWO ZWL0WWW OOWWOO � N W O ? * a > * Q Q Q CD CD U O Qc CD Q Qc Q Qc Q U U < * U Q Z Q F- * U. F- 2E * F- 2E 2E * * G CC G 2E G a * * G W * * a' J CC w * W F- c0 CO c0 (0 c0 c0 0 rr r r r- } O o C) p O o H N N N N N N N COCV CO N to c\I co F- N N N N N N 0 Q • • ca _ n oar CSI 0 0 Z o cc a o O W ' ("9 W J a) •i 0 0 X J W w a) D 0 D - -1 U) U) Q F- W c c zW W < 00 J CO U) 3 Y U a m O 0 o U Cn U) W '- W Cr) ( -0 _ a0) O O O DO 0 O O o O N a U 0 0 2 ao ao a0 Y 0) o w W W N < 0 i N. i o (0 U cc cc � U) in N N N co 0 751: 0 cD 0 0 co - N z w z Z_ Z_ 4# N a H ~ Z ~ 0 Q Z ¢ gym 2 � 2 F. �� J w W w W IIS J 0 m Z J w 0 O E O m0 a U = cn F- Z ZQZQZw NN X cn z_ z_ z z Nu_ 0 • d W C 0 02Ow2w2J ;. J '� � Q' �' E -0 E Y '++ m V � Z � � Z � m Q� ( can (an 5,-; � mU ct E o o m F- a) m m0a00D0 J * z cc)o o LoQ Lt m CO W 00 0 * a 0 ��c, J W Q. 0 W J � UJUJ � * COU W mm CO m * a) N * NO = O co -0QY0c¢oY03YQ � NU M U 22 2 2 `- Y m a) < w w O E0 U) 0zw020NONCO a U N- F- 1- 1- N O Nam O Z 2Z < Z - 2Nn. cn co U) �n - cn U) z Z a) - U) U) - - o rn rn Z O CO o � bo m w U >- >� � N O � Et W � N N z 0 0 N � D 0 0 I� > U) � � F= ZN x— < II W � 0 O a cvrYoo0cCO � wOc�nm H x X x X 0 UPJ Q W U) W J U W U W O W - L'Q U) M O U UI c --/ U) U) p a) * J U J _ u) J U) J a ch M M C) (/)-- IQ 30 > m N 0 w Ce Q m J m J m J m o F- F- F- Z > -0 °° o >z> 0 "` - a U` aN (� aOaNZ W' 0 NW '— W W w W ~ 0E- D CC :Z- .(0 � 2 O2 � O2o � 0u ` 0 x 00 U 0 a0 2 w5U= W CI Q0 0D > 0D D � mm2 SCS in 00 .- 0 .-.0 Dco or- c� ca002 n za = a = = aia � 00 � �z F= zz §Z §z a -, o o OZ � = Z Oo F- oF_ ~ o > omww we z CTE a� QE .-,W W 2 mwSviOQ � X � W X W W XwX � ZZNQU) U U) U) .N � •NU) j � ZP0 ffzF- Uli — JEnH0ic> 00En < in � F- F- � mc� � � � � o � F- oco LI) I-- w N � < N Q Q N 2 N z z = � 0 L'cfl X0 0 '0 '0 0 c13 , o o z 0 r- w NO2N22N NNOOMam a) N a) co 0m 0m c0 O w Z U Z Z Z Z Z z Z Z U U > .- Z (-) 0 z U II Q 0 J N 0 * 0 * * Z 2 z o Z o Z Z z vZ cn< * O E 0 U z > * CCW CC ICC W' w' w' 't CCw' : * a U) a N cC 2 a a a a a a a * F- a �* � R' ¢ * CO co (0 (0 E. 0 0 0 N N N N CO CD N N N N M M • • 2 E a) g \ / o \ § \ bpi E ctt O / \ \ / / I-- 0. R W .c w 2 0 WCo ƒ 5 9 ¢ .- - 0) -( a O % z O m rx/ & O p EL ? ƒ \ 0- -)co zOz G ƒ R O 0 0 a U = ± - CLI- ¥ R / I \ c 0 2 / -1 f e $ L ± 2 o % U CD -I o \ 2a ) ct k i \k / / ƒ 0 7 g = a � » 7n7 d • " R""' SAFETY NOTES: ""CHROME TBG&LN KB.ELEV.= 54 09-06 BF`.ELEV= 0 KOP= 3401' Max Angle= 0 @ 4200' , r 30' —7"X 5-1/2"X0,13=4.892 1 Datum MD= 9347' Datum ND= 8800'SS � 78'-90' —5-1/2"WFD ER PATCH,ID=2.90"(10/30/08) H I. kt I I 2088' H5-1/2"HES X NP,D=4.562" 9-5/8"CSG,40#,L-80 BTC,13=8.835" 2165' • 9-5/8"FOC — 2330' 2152' —9-5/8"HES ES CEMENTER,D=8.835 9-5/8"FOC — 2461' — GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,MN-80,BUTT,1D=12.347" H 2715' . 3278 3275 9 MMG DOME RK 16 01/03/08 3 5617 5413 27 MMG DOME RK 16 01/03/08 Vinmeommom 2 6848 6515 26 MM3 SO RK 24 01/03/08 Minimum ID =2.81" C( 8073' 1 7821 7400 23 MMG DMY RK 0 04/22/06 5-1/2" x 3-1/2" X NIPPLE REDUCER I IF 7967' —5-1/2"HES X Ni',D=4.562" �{ 7988' 9-5/8"X 5-1/2"BKR S-3 FKR,ID=4.750" II 8013' H 5-1/2"HES X NP,ID=4.562" 5-1/2"TBG,17#,13-CR VAM TOP,—1 8086' .0232 bpf,ID=4.892"" 8073' —15-1/2"XN NP,D=4.455" TOP OF 5"LNR TEBA CK -I 8149' ! TOP OF 7"LNR —I 8498' 8073' —3-1/2"X NP REDID=2.81"(01/04/08) 9-5/8"CSG,47#, MN-80/SOO-95, —I 8814' \7 \ 8086' 1-15-1/2" WLEG,D=4.892"1 .0732 bpf,ID=8.681" H HMD TT NOT LOGGED PERFORATION SUMMARY REF LOG: BRCS ON 08/03/76 ANGLE AT TOP PERE: 11 @ 9207' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 8498' —I BOT TEBACK,D=? 3-3/8" 1/2 9207-9214 O 10/27/91 1 I 8504' —I9-5/8"X 7"BOT LTP,D=? 3-318" 4 9216-9236 O 11/30/91 7 r 3-3/8" 1/2 9220-9283 0 10/27/91 3-3/8" 1/2 9223-9263 O 10/28/91 3-3/8" 4 9236-9283 0 10/27/91 3-3/8" 1/2 9243-9263 0 10/28/91 3-3/8' 1/2 9288-9310 0 11/09/91 4 9310-9320 S 10/16/91 1111111 4 9331-9346 S 10/16/91 3-3/8" 4 9354-9357 O 11/30/91 3-3/8" 4 9357-9367 0 11/29/91lio 4 9365-9371 S 10/16/91 3-3/8" 4 9377-9386 0 11/29/91 4 9389-9397 S 10/16/91 3-3/8" 4 9428-9450 0 10/27/91 4 9450-9455 S 10/16/91 3-3/8" 8 9475-9494 O 10/27/91 3-3/8" 8 9494-9514 0 10/27/91 v1l1'1ceive PBTD — 9527' •1•••••••...4,0 111111111111111 1111111114.. 5"TIEBACK LNR,18#,13CR-80, .0177 bpf,D=4.276" — 9549' 111111111111111 111111111111111 7"LW,29#,N-80,.0371 bpf,ID=6.182" — 9648' 1 1 1 Ti) H 9665' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNT 08/12/76 ROWAN 34 ORIGINAL COMPLETION 10/13/08 JCIWPJC RLL UPPR PKRIFISH(10/08108) WELL: 09-06 10/821/91 A11D14 RWO 11/21/08 JCM/TLH SET UPPER PKR(10/30/08) PERMIT No: 1760480 04/24106 DOYON 14 RWO 01/22/16 MRD/TLH SET PLUG(01/11/16) API No: 50-029-20216-00 04/30/06 RVVU PJC DRLG DRAFT CORRECTIONS 03/09/16 TBDIJMD PILLED PLUG(03/02/16) SEC 1,T1ON,R15E,3926.34'FEL&3542.45'FN. 01/09/08 DAV/SV GLV C/O(01/03/08) 01/08/08 JMF/PJC SET LOWER PKR(01/22/08) BP Exploration(Alaska) STATE OF ALASKA IlASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Ef Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:5r fJ) 1 p1(? f 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 176-048 ` 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20216-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-06 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVE D Total Depth: measured 9655 feet Plugs measured 9322 feet true vertical 9162 feet Junk measured feet FEB 0 5 2016 Effective Depth: measured 9322 feet Packer measured 7988 feet true vertical 8834 feet Packer true vertical 7555.75 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 83 20"94#H-40 35-118 35-118 1530 520 Surface 2683 13-3/8"72#MN-80 35-2717 35-2717 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 5-1/2"17#13Cr80 29-8086 29-7647 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED a;=? I I 20lF Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 424 1267 13853 1863 223 Subsequent to operation: 157 1092 14326 1873 223 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations f3 Exploratory 0 Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil a Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,� rGarryrA(Wipro) Title PDC Principal Engineer Signaturesaa Phone +1 907 564 4424 Date 2/4/16 Form 10-404 Revised 5/2015 V7- -' z11 /16-,,"74 ll /1 / ,,"76 RBDMS l,k- FR 0 5 2016 Submit Original Only • • 0 0• 0 0 0 O O 0) 0 0 N- CA (. CO (O N CO — CO O N- O r O O N O N CO cr L() N- U N o 0 0 0 0 0 0 0 0 L co CO 10 N- LC) N- (C) 3 L() CO N- CO CO N m r Ln L() CO CO CO CO N. N- L0 N- O) O O N- N- (.0 Lf) O LO V co co co o N N N N CO 0) 6) N- CI I I I I I I I I 1 H 0 CA CO L1) Ln r- CO M LO O CO 0) M M M C) CO N- O N N N N N- co CD co N- LO N- 0) N- N O CO CO r' L() L() LL) CO N. s- CO CO CO Ln O O N N N N C70 (A (A d0 C.) 0 °L() 0) N O LC) LO CO CO LC) LO O • Q) M M M = M CO .- LC) N � N N N (0 CO • CO.172 F— O 0 Lf) O O ro, O CT O C+0 (70 °OO °DUOU 2 J Z O Z co CO co • d = '$ J _ l# N U o � � Ea CO - c N Lrn N61.0 rn in Ln t co OO M N N L() O L() LI) C CO CO — N V V r C) (V N N (O r CO J W W W W H H H H p)O QQQQ = H W 0 0 0 0 U 22 U 0 u cc c[ cca Z Z c[ W W W W W W pp O D H H H Hz Z 0 Z Z Z Z J J H • • C) N W N-m LO CD CO CO CO N CO N- N 0) Co N- LO LNC) LO LO Co t Q r- N Lo O ,- .- N- LON- o ti O , O N O N N- O) O N C'') LC) N- 00 C O 0) O O LC) Co N O N- r` N- CO Co Cb CO CO CO CO CO 6) O O) 0) O O Co Cb OO Cb 0o Cb CO OO a0 00 Co M Cp CO 0) I- a O F' co v. r LC) 0) 0) r LC) M M CO CO N N O) M t N- LC) CO M N Cb LC) O 6) OO CO LO Ln 6) LU N a 0 M N r- O r N C) L[) r N- O N- CA d- 0 O N (Y) r- 0) O N V m N- o 0) CA O M Lo Cb W O I` r- r- r - o 0 0 0 0 0 o m 0) O) 0) O) O ooaoaococ00000aoC000000aoaoaoo 0 > w w a w z uJ w O w 0 I- H J a w o00 Y U 0 o m 00 w Y Y W W t - O M m O O CCS Ln _ Oo r- ON- O Lo V- _1 _1 _1 Q Q C/) w r — G. r C9 Cb oo N V' CO r- N- o CA 0) Ln Lf) r Q Q Q w a a U z U C 0 N N N N M M M M M M M M M 'ct LC) 2220 _1 _1 _, 0 _,0 0 UJ W W a 0) 0) 0) O) 0) 0) O) 0) O) 0) 0) 0) 0) 6) O) O)CD m Q Q Q = p Op a s W , Z O Z t 0 0 0W W W a 1- 1- Q J Q V W 2 2 2 O Cn Cn Ln Cn Cn 07 < 012 t C N- O C LO C0 O r CJO LS) r r- 0 Co OLo O = m O N Co COO O r CO 10 CO r` CO Co 0) N LO N N N N N N M CO M M M M M CO V V 'j O 0) 0) 0) CA 0) 0) 0) 0 6) 0) 0) O) 0) 0) 0 0) ( Q— L C) O E w w J = H O a J a O 0 0 U c ▪ LL LL. LL N LL N U) U) (I) Cn U) U) (J) C/) U) U) 76MMMOoOaaaaaaaaaa 8 WCtWmacommmmmmmmmm 0 t o a w H w w 0 0 0 0 0 0 0 0 0 0 0 O m m rn rn rn rn r r ,-- r 0 O cr r C3) CA 0) 0 0 0 0 0 0 0 0 0 O W Z LL O Z r r r r N N N N N N N N N N Z LL- Q W W . r- O) O) -- -- -- -- -- O [Y W NN LL (N (N (N 0 0 .--. r r r r r . - - - - - Z a W 0 111W Lt W w L. W a ' r r r = = = = = = r = = = = = Q 0 J H J J 0 D a' a O m o D w -J -1 0 0 w W Q Q a o ELT w Cn a W Cu E La 2 Co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w (n ' ' 0 ) 1 i ' i I a s Cn O a N CL (A (T 6 (3) CA C3; to (T (� (A 0; (A 01) CA (A m a a a 0 J 0 0w Cl 000 O O O O O O O O O O o 0 O < Q m m a U C/) ma w • • Packers and SSV's Attachment PBU 09-06 SW Name _ Type MD TVD Depscription 09-06 PACKER 2287.79 2287.72 9-5/8" Open Hole Packer 09-06 TBG PACKER 7988.31 7555.75 5-1/2" Baker S-3 Packer • 9 Cl) O c (NI O -0 T trn 7 N O CO al c6 -0 M X CO CD a) _C Q -o a) _c W N- - V > m H J O a) ca .� wW LO cO CO O ,O N O7 4) fj > OM J m a) o •to U) E H W O CD E N Q a) 2 co o� cad w z u_H 0� a U cp .2 [n O N- . O CD U J y > N v —9cn0 Le) -8 p H 00_ -, Z O a) O f� ~ L a W W' H 1.C) 0 E > O E co 2 Q U J 0 (D N H (1) a„) � rn � E Q NW w OO I pW Cl_ 0_ .0 O N H O ©r- cf - Q> J 0 w co H 1_ co --:-•-c) O ct Z O Q a W CA O a-. o O co m c < N v) LL a O HH O � � E w J � p0 mQ Oz W EX � —O co < J WHai (n ° W "0Q � N � — W p10LLLu Z a i ALL -0 O J � 2 O' O Z W x � J � cn a 2Ou ooH E E < > 0W -) -0 -R Z NwaUr OH DCC � p0 N OQa LL O � L1J >J * .- J 0- Er) W O co w d 2 II — O (n O H J .6 L O (n > CO coN r (n N cn Q Ov- d O� 0- O Q- �M o U U m E a) II = 0J O >- Z I- = p w 5 o - aco � * to � O = H }(NI Q wZOOW 46 p Q H U * a rn 0 U H - W CO c � a Q in r) °6 NSW * wQw rn* Z Q Z - oZ � H 1- d Y ,- _ a) Nw rn = EtO� .c `n ° c _1 Li] p oo0Nm O U QE N H p p j "O - < m J z N W J Q a) - co - < N 2N- >- p 0 N E.- -0- F 0w cj � o _S N � O � to W O Z W' W II D (73 O W = Q W Z (n U W ^N O 0 H Z U N .- a M0 0_ Q Q Q X ; cp . 0 O 0 Z W W 0 Z (Al I a p * OMO 1n O W W ZO W OHw a) o C) 0H � � 0 U' W a W `O # CI ofH 0Z � . D pU °OV9bpoLaL o oOoZOiW w > -§ ©UUCH N 3 U > v Z Z _ N W o a — o Q p p » a W Z W CO a 3 11 > a °6 H HZ � Z H x Q z � c p O coY w _ Z H — 0 (n 0 � d o O U> m O O N O m N N O O J U N < Z Z — Ur O co O cnLL > H � Hp � I— LO D — ou- _ DWDO OH H OO � 73 > Jda � � W <I-L 0 O a>>) II _ H ccW 0U UW '- NZJ W HU O > W Q H W W X J H � THO- a Hm CO 4# (N H0 H co co I' EJ * * 001- 0 : H _ 3 LL * ? cnJcn * * acCcC W =SLT. * W Qto .- O O O O O O O O H M M V N N N 5 O O N— N N N H N r r r 0 Q Cl) • C (13O cE cu i E a) CD- d T Q cn ~ -a 0 w 5 O O CO o a a m a 0 0 c Cl) C D a) a) L U N N m � KB.EiB/= 54' • SA4111)TES: —CHROME TBG 8 LNR— BF.ELEV=''' 0 09-06 KT= 340130' —7'X 5-1/2"X0,ID=4.892 Max Angle= 0 @ 4200' 1 Dattrn TVD= 8800SS Datum WO= 9347' p. 4 78'-90' I—5-1/2"1/1/FD ER PATCH,ID=2.90"(10/30/08) ' 11 I I $ 2088' —5-112"HES X NF,ID=4.562" 9-5/8"CSG,40#,L-80 BTC,ID=8.835" — 2165' • 9-5/8"FOC — 2330' 2152' —19-5/8"HES ES CEM6NTER,e=8.835 .... 9-5/8"FOC — 2461' mlIM GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8'CSG,72#, MN-80,BUTT,ID=12.347" H 2715' _ . 3278 3275 9 MMG DOME RIC 16 01/03/08 3 5617 5413 27 MMG DOME RK 16 01/03/08 24 01/03/08 Minimum ID =2.81" @ 8073' 2 6848 6515 26 MMG SO RK 1 7821 7400 23 MMG DUI' RK 0 04/22/06 5-1/2" x 3-112" X NIPPLE REDUCER I II I 7967' —5-1/2"HES x Nr,ID=4.562" 2ZI '5‹ 7988' —9-5/8"X 5-1/2"BKR S-3 FKR,ID=4.750" I I 8013' .I—5-1/2"FES X MP,0=4562' 5-1/2"TBG,17#, 13-CR VAM TOP,— 8086' .0232 bpi,ID=4.892— TOP OF 5" - CK — 8149' I ........,_ 8073' —I 5-1/2'XN NOP,ID=4A55" TOP OF 7"LINER H 8498' 8073' —3-1/2"X NIP REDID=2.81"(01/04/08F1 9-5/8"CSG,47#, MN-80/500-95, H 8814' / \ 8086' —15-112" WLEG,ID=4.892' _0732 bpf,ID=8.681" —E_.40 TT NOT LOGGED PERFORATION SURMA RY REF LOG: BHCS ON 08/03/76 ANGLE AT TOP PERF: 11 @ 9207' ' ,if! Note:Refer to Production DB for historical perf data SIZE SFF INTHRVAL Opn/Sqz DA IL 8498' —BOT TEBACK,ID=? 3-3/8" 1/2 9207-9214 0 10/27/91 8504' —9-5/8'X 7"BOT LW,ID=7 3-3/8" ' 4 9216-9236 0 11/30/91 g /. , 1 1 3-3/8" 1/2 9220-9283 0 10/27/91 3-3/8" 112 9223-9263 0 10/28/91 6. 3-3/8" r 4 9236-9283 0 10/27/91 3-3/8' 1/2 9243-9263 0 10/28/91 3-3/8" 1/2 9288-9310 0 11/09/91 ✓ 4 9310-9320 S 10/16/91 ir 4 9331 -9346 S 10/16/91 3-3/8' r 4 9354-9357 C 11/30/91 9322' ELM D —27D-500 INITERVVELL 1-EX RUG(01/11/16) 3-3/8" r 4 9357-9367 C 11/29/91 ✓ 4 9365-9371 S 10/16/91 im 3-3/8" Iv 4 9317-9386 C 11/29/91 ✓ 4 9389-9397 S 10/16/91 imi 3-3/8" ' 4 9428-9450 C 10/27/91 11 r 4 9450-9455 S 10/16/91 3-3/8" IF 8 9475-9494 C 10/27/91 3-3/8' r 8 9494-9514 C 10/27/91vPB-ro H 9527' #I#V . .#404..v;119 # Ol 0160..0* ....04.4 .4•••••• 0.0..00.4 •••••••• 5'TEBACK LNR,18#,13CR-80,.0177 bpf,ID=4.276" — 9549' 1•1***404 •••••••• 1A0Att.A1 ID — 9665' 7"L.N2,29#,N-80,.0371 bpf,ID=6.182' — 864.8' v.•v.v v vv. DATE RB/BY COMENTS DATE RB/BY COP RaJDHDE BAY LINT 08/12/76 ROWAN 34 ORIGINAL COMPLETION 10/13/08 JCW/PJC RJLL UPFR FKR(FISH(10/0f3/08) VVELL: 09-06 10/821/91 AUDI 4 MO 11/21/08 JCW/I11-1 SET UPPER FKR(10/30/08) PERMIT No:V6o4ao 04/24/06 DOYON 14 RWO 01/22/16 fARD/TLH SET RUG(01/11/16) AR No: 50-029-20216-00 04/30/06 RWL/PJC DRLG DRAFT CORRECTIONS SEC 1,T10N,R15E,3926.34'Fa_&3542,45'FN... . , 01/09/08 DAV/SV GLV GO(01/03/08) . 01/08/08 JI/F/PJC SET LOWER PKR(01/22/08) BP Exploration(Alaska) • • 2�«0 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 10, 2015 Attn.: Makana Bender . DATA LOGGED 333 West 7th Avenue, Suite 100 s'k'`53 V1 m{iao15 K.BENDER Anchorage, Alaska 99501 AUG 13 ZU L RE: Production Profile: 09-06 )13': Run Date: 6/25/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 09-06 Digital Log file, Interpretation Report 1 CD Rom 50-029-20216-00 Production Profile (Final Field Print) SCANNED 1 Color Log 50-029-20216-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: /a,,agcte#zoL, / ' ,/ • Z WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. August 10, 2015 Attn.: Makana Bender K' a , DATA LOGGED 333 West 7th Avenue, Suite 100 ... , /2015 K.BENDER Anchorage,Alaska 99501 AUG 3 2 RE: RMT-I Borax Log: 09-06 Run Date:6/26/2015 The technical data listed below is being submitted herewith.Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 09-06 Digital Data(LAS), Digital Log file (Field Data) 1 CD Rom 50-029-20216-00 Reservoir Monitoring Log(Field Print) 1 Color Log 50-029-20216-00 SCANNED PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: / ✓aL 'u&., -,i6 / , 4/ i STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMMI ION REPORT OF SUNDRY WELL OPE~A.~~4NS 1. Operations Abandon ~ Repair Well Q , Plug Perforations ~ Stimulated Cltk~3 ~ TUBING PATCH - Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Extension Change Approved Program ~ Operat. Shutdown Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory ' 176-0480 " 3. Address: P.O. Box 196612 Stratigraphic ~ Service 6. API Number: Anchorage, AK 99519-6612 50-029-20216-00-00 7. KB Elevation (ft): 9. Well Name and Number: 54 KB ~ 09-06 • 8. Property Designation: 10. Field/Pool(s): , ADLO-028327 , PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 9655 ~ feet Plugs (measured) None true vertical 9161.75 feet Junk (measured) None Effective Depth measured 9565 feet true vertical 9069 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" 94# h-40 Surface - 78' Surface - 78' 1530 520 Surface 2714' 13-3/8" 72# MN-80 Surface - 2714' Surface - 2714' 5380 2670 Production 8814' 9-5/8" 47# MN-80 Surface - 8814' Surface - 8337' 6870 4760 Liner 1150' 7" 29# N-80 8498' - 9648' 8160 7020 8036 ' - 9155' qq ~~yy ~~ ( ' ry Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, and measured depth) 5-1/2" 17# 13CR VAM SURFACE - 8086' 3` ~~ ~ ~ ~~~ 7~k TUBING PATCH 13 CR-VAM 7T - 90' Packers and SSSV (type and measured depth) q~ 9-5/8"X5-1/2" BKR S-3 PKR 7988' ""~~ ~~ 5-1/2" WFD PKR 77' 5-1/2" WFD PKR 90' 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: SI 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development ~ - Service Daily Report of Well Operations X i6. Well Status after proposed work: Oil - Gas ~ WAG ~' GINJ WINJ ~' WDSPL ~" 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble s. ~ P~c~ \SC1C~C)O.~"~ ~\~~ C~ i~ VV C~ ~ ~~ Printed Name Gary Pre4 Title Data Management Engineer Signature Phone 564-4944 Date 11/12/2008 ~--- '~~ Form 10-404 Rev~ed 04/2006 "'~ ~ ~ ~''~ ~ d~"~= ~•` t~~a~ Submit Original Only ~--Vl~ 09-06 176-048 PFRF ATTAC`HMFNT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth lop Tvd Depth Base 09-06 5/13/77 PER 9,331. 9,346. 8,842.51 8,857.25 09-06 5/13/77 PER 9,365. 9,378. 8,875.93 8,888.71 09-06 5/13/77 PER 9,387. 9,397. 8,897.56 8,907.4 09-06 5/13/77 PER 9,428. 9,455. 8,937.92 8,964.52 09-06 5/13/77 PER 9,475. 9,514. 8,984.23 9,022.69 09-06 9/2/85 APF 9,207. 9,214. 8,720.78 8,727.65 09-06 9/2/85 APF 9,220. 9,283. 8,733.54 8,795.39 09-06 9/2/85 RPF 9,475. 9,514. 8,984.23 9,022.69 09-06 4/3/87 APF 9,285. 9,320. 8,797.35 8,831.71 09-06 10/16/91 SQZ 9,207. 9,514. 8,720.78 9,022.69 09-06 10/27/91 RPF 9,207. 9,214. 8,720.78 8,727.65 09-06 10/27/91 RPF 9,220. 9,283. 8,733.54 8,795.39 09-06 10/27/91 RPF 9,428. 9,450. 8,937.92 8,959.59 09-06 10/27/91 RPF 9,475. 9,514. 8,984.23 9,022.69 09-06 11/9/91 RPF 9,288. 9,310. 8,800.29 8,821.89 09-06 11/29/91 APF 9,358. 9,365. 8,869.05 8,875.93 09-06 11/29/91 APF 9,381. 9,387. 8,891.66 8,897.56 09-06 11/29/91 RPF 9,220. 9,260. 8,733.54 8,772.81 09-06 11/29/91 RPF 9,365. _ _ 9,371. 8,875.93 8,881.83 09-06 11/29/91 RPF 9,387. 9,390. 8,897.56 8,900.52 • 09-06 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1/3/2008'"""WELL S/I ON ARRIVAL"*"(patch) PULL RK-DGLV's FROM STA. 4 AND 3 @ 3,278' AND 5,617' MD. ISET RK-LGLV IN STA. 4 @ 3,278' MD 'SET RK-LGLV fN STA. 3 @ 5,617 MD. SET RK-OGLV IN STA. 2 @ 6848' MD 'sPULLED 5.5 PXN PLUG BODY @ 8073' MD "*CONTINUED ON WSR 1/4/07**" "**CONTINUED FROM WSR 1/3/07*"* SET 5.5 XN LOCK W/ 3.5 NIPPLE REDUCER OAL 34" @ 8040'SLM SET 3.5 XX W/ 8 1/8 PORTS @ 8042'SLM. PERFORM PASSING CMIT- *'*WELL LEFT S/I'"`* DSO NOTIF 1/4/2008T/I/0=220/220/0 Temp=S1 Assist S-line (Patch repair TxIA Comm) -CMIT 'TxIA PASSED to 3000 psi -Loaded & pressured up TxIA via IA w/32.5 bbls 70"`F Ecrude. T/IA lost 40/40 psi in 1st 15 min. T/IA lost 20/20 psi in 2nd 15 min. Bled 'T & IAP all fluid ~12 bbls total. Verify casing valves open to gauges, tag well & ;notify operator. S-line still on well upon LRS departure. Final WHP's=50/100/0 1/11/2008 WELL SHUT IN ON ARRIVAL (E-LINE SET LOWER PATCH ELEMENT). INITIAL T/I/O: 0/125/0 JOB CANCELED DUE TO LEAKING SSV VALVE. FINAL T/I/O: 0/125/0. WELL LEFT SHUT IN. 1/19/2008 ***WELL S/I ON ARRIVAL***(pre tbg patch set) _ "******400 PPM H2S"""*'*''*" RAN 3.5" GS CORE, 3.5" EQU PRONG, SD @ 8061' SLM EQU TUBEING PULLED 3.5" XX PLUG FROM 8060' SLM `""'WELL LEFT S/I ON DEPARTURE""" ~~1/21/2008WELL SHUT-IN ON ARRIVAL. RIG UP PRESSURE GEAR AND SETTING TOOL. WAITING ON LRS TO PUMP WARM FLUID DOWN TUBING. *""CONTINED ON 22-JAN-2008*'"` JOB INCOMPLETE. 1/22/2008,"'*CONTINUED FROM 21-JAN-2008*"* -WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O: 400/300/0. SET LOWER PORTION OF WEATHERFORD 10' PATCH OVER LEAK IN TUBING AT 86'. MID-ELEMENT OF LOWER PACKER SET AT 90'. MIN ID OF PATCH 2.992'r WELL LEFT SHUT-IN. FINAL T/I/O: 400/300/0. `**JOB COMPLETE"'"` • • ~ 1/22/2008~T/I/O= 300/260/0. Assist E-Line (Patch repair TxIA). Pump 3 bbls of neat meth and 65 bbis of 120"F crude into the Tbg. Final WHP= 400/300/0. Annulus casing valves are open to gauges. i 2/7/2008 """WELL S/I ON ARRIVAL"** ATTEMPTING TO SET 5-1/2"WFD UPPER PACKER AND PATCH ON E-FIRE SAT 90'MD ~ """`CONT. WSR ON 2/8/08"* 2/7/2008 T/I/0= 400/300/0 Assist Slickline (Patch Tbg) Pumped 2 bbls meth, 50 bbls ;150*F crude down Tbg. Stand by for S/L to set Patch/Plug. Pumped 10 bbls 110"F crude to assist S/L in releasing Patch- """`Continued on 2-8-08""" 2/8/2008 ~ ""*CONT. WSR FROM 2/7/08""" UNABLE TO SET 5-1/2"WFD UPPER PACKER AND PATCH AT 90'MD DROPPED CUTTER BAR(3.5" CENT.,1-7/8" BODY,1-3/4"FN,5' OAL) START WEATHER HOLD.6 HRS. FISH C-BAR FROM 24' SLM. *"" NOTE*"" SLICKLINE TL. STRING, E-FIRE TL. AND WFD. PATCH STILL IN HOLE OAL 44' **" **"WELL LEFT S/I""" DSO NOTIFIED ___~ _W_._ _ __~ _._ ~~~ _- ----______~ , _._.___.__~__.~.__~ _._~. __._~_____.__ _ ___. _~--___..-_- 2/8/2008 ""`Continued from 2-7-08"** Assist Slickline- Pumped 3 bbls crude, 5 bbls 110~F diesel down Tbg. Released from job. FWHP's= 140/200/0 2/11/2008.`**WELL S/I ON ARRIVAL*" 'ATTEMPTING TO FISH E-FIRE AND SLICKLINE TOOL STRING. PLANT OVERSHOT W/ 1-7/8" GRAPPLE C~324'SLM f WORK TOOLS FOR 1 HR. **CONT WSR ON 2/12/08""" 2/12/2008': *""CONT W SR FROM 2/11 /08""* ATTEMPTED TO FISH TOOLSTRING & 5-1/2"WFD UPPER PACKER W/ PATCH FROM 20'SLM ~Z ""``WELL LEFT S/I*** DSO NOTIFIED"*"" 2/24/2008 _._._..,.rywV.___~_._.a~ ___,~ ex___ "*WELL S/I ON ARRIVAL*** [pre ctu fish tools off tbg patch] RAN 3.5" BLIND BOX SD @ 46' SLM. PLANTED OVERSHOT (11' 4" OAL.) (4.68" O.D. OVERSHOT) (W/ 3 5/8" GRAPPLE) @ 52' SLM. RAN 4 1/2 GS LATCHED TOP OF OVERSHOT @ 42' SLM. JARRED UP 10 MIN... CONFIRMED OVERSHOT FIRMLY PLANTED (NOTE: OVERSHOT, GRAPPLE & EXTENSION SOLD TO BP ON 4/17/08 - RETURN TO BP WL BLDG !!) **NOTE: TBG FL @ SURFACE" "*"LEFT WELL S/I, TURNED WELL OVER TO DSO*** • • 3/30/2008~(SSV Repair) Repaired SSV ***Job Complete**" Repaired fitting on Hydraulic line on Big Bore Otis Actuator. 5/30/2008 .~_v_...__...._~,______.~~_._._.__._...,~._ _ _ _______~_~ __.____~. CTU #6; Fish setting tool, MIRU. MU Baker fishing BHA with 4" GS spear. Tag fish at 60' ctmd. Jar 60 times at 30k to 33k over. POOH for pipe management. Cut 60' of pipe off. Re-head and RBIH with same BHA. Latch fish at 60' ctmd. Jar up 80 times at 32 k# over. POOH for pipe management. Cut 60' of pipe off. Cont' on WSR 5/31/08 ... 5/31/2008~CTU #6, Fish Setting Tool; Cont' from WSR 5/30/08 ... Re-head and RBIH with same BHA (4" GS hyd. spear}. Latch fish at 60' ctmd. Jar up 100 times at 32 k# over. POOH for pipe management. A total of 240 up-iars @ 32 k# have been made at this point. No evidence or indications of shearing the setting tool. The hydraulic 'G' spear is in good condition. Elect to abort further attempts with =CTU #6. RD CTU #6. """ Job Incomplete ""* 6/25/2008 T/IA/OA= 200/400/50 Temp= warm Leaking gland nut RU HP bleed tool onto THA test void, 200 psi to 0 psi. Tightened (1) G/N that was loose, checked all others, all were good to go, cleaned up oil from flange. 10/5/2008CTU #6, Fish; MIRU. Cont' on WSR 10/06/08 ... ~~""'"InterAct is °;publishing """~~ 10/6/2008 CTU #6, Fish; Conn WSR from 10/5/08 ... ~"InterAct is publishing ~~~Fishing packer setting tools stuck at 80'. RIH w /jars & intensifier 4" GS. Jars failed. POOH and change out jars. RBIH, latch fish, 4 iar hits fish came free. Hang fis off in master valve. Shorten fishing tool string. RIH and latch fish. PUH but could not pull fishing neck through BOP's, unsure if caught on square edge of fis h h nor rf dimensions are inaccurate. RBIH and hang fish back m master valve. Elect ~ to have SL recover fish. RD CTU. **` Job Complete *** NOTE: Length of actual fish is unknown, possibly just overshot, overshot and 'setting tool, or overshot and ..? F____ _,~. _______m_.~ 10/8/2008 """WELL S/I ON ARRVAL*** (post patch) B E-FIRE &WFD SETTING TOOL FROM MASTER VALVE (E-FIRE SETTING TOOL INDICATES 5 1/2" ER PACKER WAS SET PROPERLY) i SET 4 1/2" CAT STANDING VALVE W/WFD SEAL ASSEMBLY IN WFD ER PACKER @ 52' SLM j jATTEPTED MULTIPLE MIT-T'S TO 2500 PSI W/ NO SUCCCESS ' IPULLED 4 1/2" CAT STANDING VALVE W/WFD SEAL ASSEMBLY FROM ER PACKER @ 52' SLM t :PULLED WFD 5 1/2" 13CS.P~-T~I~I `".rrEr^rr^~~C.h~R FPM 55' SLM (ALL %ELEMENTS, PACKING & SLIPS INTACT) _ _.'`"JOB I_N_PRO_GRESS, CONTINUED_ON_10/9/08 WSR*'" ~~ ___~.. _~~,~.~.~ ~__.,. _ _.__._.~.__ ~_ _m.~.v. _..i 10/9/2008s"'"`CONTINUED FROM 10/8/08 WSR"'(patch) ;UNABLE TO TEST WFD 5 1/2" LOWER ER PACKER BECAUSE OF OGLV @ `;6,848' MD 3 ;WILL RETURN AT LATER DATE TO SET PATCH '"""WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS'** I i f__ ~.,_.~.__ _._~~___.~__ .~.~_._ti.._~_~ _ _~__d,. __.~ ~ .~ ~..._ .., .e_____.___ _._..._._ __~~ ~~...,r._ _. ~.~._.~_.~. 10/29/2008:**"* WELL SHUT IN "** (set patch) sDISPLACE TUBING W/ 250 BBLS DEAD CRUDE (HIGH H2S) j B&F TUBING & ANCHOR ASSY. @ 6T SLM W/ 3" BRUSH, 6' STM, 3.625" ;CENT, 5-1/2" BRUSH WHILE PUMPING 20 BBLS OF HOT CRUDE ?DRIFT TUBING TO ANCHOR ASSEMBLY @ 6T SLM W/ 4.50" DUMMY WFD -Dfl.LT ?.CURRENTLY SETTING WFD PATCH W/ E-FIRE ':"""CONTINUE WSR ON 10-30-08""" } : 10/29/2008iT/I/0=870/700/0 Assist Slickline, Load Tbg, Brush & Flush (Pre Patch) t Loaded Tbg with 170 bbls crude. Pumped 20 bbls 190*F crude down Tbg while ;Slickline brushed. Slickline to set Patch. ***Continued on 10-30-08 WSR*** 1 I tI I i % • ~- 10/30/2008~"""Continued from 10-29-08 WSR""` Assist Slickine, MIT-T PASSED to 2500 psi. (Post Patch) Slickline set liner top test plug. Pumped 3.4 bbls crude down Tbg to reach test pressure. Tbg lost 100 psi in 1st 15 min and 50 psi in 2nd 15 min. Slickline pulled Liner top test plug, set TTP. Pumped 5.9 bbls to reach test pressure. Tbg lost 100 psi in 1st 15 min and 50 psi in 2nd 15 min for a total loss fof 150 psi in 30 min. Bleed Tbg. FWHP's = 0/320/0. Slickline in control of well 'upon LRS departure. 5-1/2" 13CR-VAM WFD PATCH SET @ 77' - 90' ELM 5-1/2"WFD PAKERS SET C~ 77'- 90' FLUIDS PUMPED BBLS 189.8 CRUDE 5 METH 5 DIESEL 199.8 TOTAL _________.___._ ..._, ._ __._v_~___._._.___. _______..~.__.___..______ _ _,._~_..~_._._ 10/30/2008 ""'CONTINUED WSR FROM 10-29-08""* (patch / mit-t) SET 5-1/2"WFD "ER" PACKER (12.56' OAL) IN LOWER PACKER ANCHOR C 6T SLM, TOP OF PATCH 54.44' SLM (+23' CORK = 77.44' ELMD) :;SET 5-1/2" LINER TOP TEST PLUG IN TOP OF PATCH @ C«3 55' SLM EMIT-T TO 2500#, PASS (SEE LRS REPORT) EPULL 5-1/2" LINER TOP TEST PLUG W/ 4-1/2" GS @ 55' SLM (ALL PACKING INTACT) SET 2 7/8" XX TTP IN NIPPLE REDUCER C~ 8055' SLM MIT-T TO 2500#, PASS (SEE LRS REPORT) ;PULLED 2 7/8" XX TTP @ 8055' SLM z**"RETURNED WELL TO DSO""" (WELL LEFT SHUT IN AS PER DSO) Page 1 of 1 Maunder, Thomas E (DOA) From: Preble, Gary B (SAIC) [Gary.Preble@bp.com] Sent: Friday, November 21, 2008 9:39 AM To: Maunder, Thomas E (DOA) Subjec#: RE: DS O4-28 (185-280) and DS 09-06 (176-048) Tom, The patch size for 04-28 (185-280) is actually 2-7/8" tubing And the patch size for 09-06 (176-048) is 3-1/2" tubing. • From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Thursday, November 20, 2008 8:53 AM To: Preble, Gary 8 (SAIC) Subject: DS 04-28 (185-280) and DS 09-06 (].76-048) Gary, t am reviewing the 404s submitted for the recent patch work on these wells. Yau have noted the patch on the 404, thanks. The question I have concerns the description of the patches. DS 09-06 (176-048) -- In this well, 5-1/2" tubing was patched however the patch is also listed as 5-1/2". I don't ---~ think this is correct since the patch dimensions are smatter than the actual tubing patched. In the operations summary, the ID of the patch is given as 2.992" which would lead me to believe that the actual patch is 3-1/2" tubing. DS O4-28 (185-280) - In this well, 4-1/2" tubing was patched however the patch is also listed as 4-112". Again, 1 don't think this is correct since the patch dimensions are smaller than the actual tubing patched. I did not find an ID given in the operations summary, but I would hazard a guess that the actual patch is 2-7/8" tubing. Also, was this the well that you had contacted me regarding not getting a sundry since this is an injection well? Would you look into this and get back to me. 11/21/2008 . . WELL LOG TRANSMITTAL j1' ProActive Diagnostic Services, Inc. To: AOGCC Records Department 333 W. 7th Ave Suite 1 00 Anchorage, Alaska 99501 RE : Cased Hole/Open Hole/ Mechanical Logs and / or Tubing Inspection(Caliper / MTTJ The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8951 ........." )..OO;',.-~ 1J 2J 3J 4J 5) 6J 7J Leak Detection - WLD EDE Disk OS 09-06 25-Feb-07 5~ED APR C 3.2007 11G-tfi~rf /LI ~dd ....... ....._r-£..'~"" ._..-..~.-....,....., ~ Signed: II /~ ¡; l L '. j /\.;t'\.-- L1 ÍA " I, . ( (-')t , fA l2- Date: IVL2.\R :2 2; 2001 Print Name: lilt. '"" I II vll.. ~ (/\ PRoAcTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: ?DSANCHO;VJ.G:(WMi:MCRYLCG.COM WEBSITE : ~,rWW.ME¡)~ORYLOG.COM C:\Docurnenl5 and Settings\PDS Anchorage· MPL\DesktopITransmit_Original.doc . STATE OF ALASKA SEP 2 9 2006 ALAS OIL AND GAS CONSERVATION COMML. Oil & Gas Cons. Cammission REPORT OF SUNDRY WELL OPERAWÔÑS Anchorage D StimulateD Other 0 Secure well D WaiverD Time ExtensionD D Re-enter Suspended Well D 5. Permit to Drill Number: Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 2536 11508 0 000 15. Well Class after Droposed work: Exploratory Development 16. Well Status after proposed work: Oil P" Gas WAG 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development P' Stratigraphic P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 54 KB 8. Property Designation: ADLO-028327 11. Present Well Condition Summary: Total Depth measured 9655 feet true vertical 9161.75 feet Effective Depth measured 9565 feet true vertical 9069 feet Casing Length Size MD Conductor 80' 20" 94# H-40 surface - 78' Surface 2714' 13-3/8" 72# MN-80 surface - 2714' Production 8814' 9-5/8" 47# MN-80 surface 8814' Liner 1150' 7" 29# N-80 8498' - 9648' Perforation depth: Measured depth: 9207' - 9514' True Vertical depth: 8721' - 9023' - - Tubing: (size, grade, and measured depth) 5-1/2" Packers and SSSV (type and measured depth) 9-5/8"X5-1/2" BKR S-3 o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 106 o x 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact GARY PREBLE Exploratory Service 176-0480 6. API Number: 50-029-20216-00-00 9. Well Name and Number: PBU 09-06 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Plugs (measured) None Junk (measured) None TVD Burst Collapse surface - 78' 1530 520 surface - 2714' 5380 2670 surface - 8337' 6870 4760 8036' - 9155' 8160 7020 -=- '- './/';' A "'H\\~;;C : }~~¿1-r1~..~ \.' ....'...... ',,,., ? - 17# 13-crvam - 8086' 7988' o o o RBDMS BFL 0 C1 OJ 2005 Tubing pressure 241 o Service WINJ WDSPL Title DATA ENGINEER Signature c Phone 564-4944 Form 1 0-404 Revise~/~~ h I f\ I A I U". 1,,11\ I Date 9/27/2006 Submit Original Only . . 09-06 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/18/20061***WELL S/ ON ARRIVAL*** (secure - problem well) TAG STA. # 3 WI LIB IMPRESSON ON LIB OF GLV RIH WI RK-1 WI BRASS PIN TAG STA. # 3 & # 4 SHEARED BRASS PIN. *** JOB IN PROGRESS*** "W" '_~m' _mm_c ,,1 8/19/200611 *** CONTINUED FROM 08-18-2006 *** (secure problem well) SET 5.5 XXN PLUG @ 8,054' SLM, DID NOT HOLD-PULL FROM 8054' SLM, IREDRESS PLUG RAN PXN - SET PLUG BODY @ 8,056' SLM. *** JOB IN PROGRESS *** 8/¿O/¿006f*** CONfíNÜED FROM 08=19=2006*** (secure problem-well) ¡SET 5.5 PXN-PLUG @ 8,056' SLM SET PRONG (96" OAL - 1.75" FN) @ 8,052' SLM BLEED DOWN TUBING FROM 1,675# TO 1120#, GOOD SET )*** WELL LEFT S/ *** Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken I L rr 333 West 7th Ave, Suite 100 I'" 0 '"1 ì) Anchorage, AK 99501 11 (0 Field: Prudhoe Bay \ Schlumberger RECEIVED 06/05-06/06 JUN 0 8 Z006 NO. 3835 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400., ;~<::,.z ,-'ill ~o:" """'n5 rcmmissicm Anchorage, AK 99503.2838 ' .I';".'...., ".. ... \,;;....1...... . '4 ATTN: Beth Ançhoroge ~i;f'NNE!) t:' ¡.~ WI! J b# L D CI CD D BL e 0 og escrlptlon ate o or 17·13A Rt:'::::- - I··\~(' 11001218 USIT 04/04/05 1 NK-65A A{J:'1-r")(:...~ 11084270 SCMT 07/05/05 1 02010B ::)(..X.... - r"', c.- é.. f 10964140 LDL 04/06/05 1 01·11 (l..~ ..()~+ 11051039 INJECTION PROFILE é..~ ~'I - r ~(' ,;, ,; "".) C, I ~1-5.1,~ <.. 04/29/05 1 01-09A 1 C¡(f - ().~~ 10559825 INJECTION PROFILE . I 07/31103 1 01..11 !::. -:+ - (~,# -:+- 10662950 INJECTIO~ PROFILE QDP~I - t"c..e\v~ ::>¡()3/CJ~ 09/16/03 1 11·34 I C>¡/...{ - I.~<;< 10687720 LDL 12/31/04 1 A-07 Î ~~-()4f 9153241 PRODUCTION' PROFILE (!. C, I .. r 02<' ... ,;) -i/{:'l" 02104/03 1 B·36 I q (,., - nCoC 10563182 LDL {'" 0", i - rc>(', ; ...;,~~ Î J ;::1-::111 t'\~' 07/09/03 1 01 ~20 J/;-;;:). - I ~h- 10687694 PRODUCTION 'PROFILE 07/16/04 1 K-01 I ir.~ - / ,,:;¡ I 11211415 SCMT 06/01/06 1 H..31) l "31''k - (... :~.:., 11217253 USIT 06/01/06 1 D.S:09-06 1",+(", - ;.i..J~ 11258699 USIT 04/13/06 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. , A'''ho",", Ala,.., 99508 oJ)^- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth e e STATE OF ALASKA ~f¿ 5/J'/Db ALASK4ÞIL AND GAS CONSERVATION .MISSION REPORT OF SUNDRY WELL OPERATIONS t·:~£¿3~d U:~· Ii 4 "(1"'C' \) ':t ¿uUo 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program o Suspend ~ Repair Well ~ Pull Tubing o Operation Shutdown o Plug Perforations o Perforate New Pool o Perforate o Stimulate o Waiver o Other o Re-Enter Suspended Well o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. ress: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: ~ Development 0 Exploratory o Stratigraphic 0 Service 99519-6612 176-048 6. API Number: 50-029-20216-00-00 54' 9. Well Name and Number: PBU 09-06 8. Property Designation: ADL 028327 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 9655 feet true vertical 9162 feet Plugs (measured) None Effective depth: measured 9527 feet Junk (measured) None true vertical 9036 feet Casing Length Size MD TVD Burst Structural Conductor 78' 20" 78' 78' 1530 Surface 2715' 13-3/8" 2715' 2715' 5380 Intermediate 8814' 9-5/8" 8814' 8337' 6870 Production Liner 1150' 7" 8498' - 9648' 8036' - 9155' 8160 Liner 1400' 5" 8149' - 9549' 7706' - 9057' 10140 Collapse 520 2670 4760 7020 10490 Perforation Depth MD (ft): Perforation Depth TVD (ft): 9207' - 9514' 8721' - 9023' () t~ Tubing Size (size, grade, and measured depth): 5-1/2", 17# 13Cr 8086' Packers and SSSV (type and measured depth): 9-5/8" x 5-1/2" Baker 'S-3' packer 7988' 12. Stimulation or cement squeeze summary: Intervals treated (measured): HES ES Cementer at 2152' RBDMS 8Ft MAY (I 8 2006 Treatment description including volumes used and final pressure: Cut and pulled existing tubing. Cut and pulled 9-5/8" casing at 2165'. Ran 9-5/8" Tieback to surface. Cemented w/148 Bbls (710 sx) Class 'G'. Ran new Chrome tubing. Oil-Bbl Representative Dail Avera e Production or In'ection Data Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure 13. Prior to well operation: Subsequent to operation: 14. Attachments: o Copies of Logs and Surveys run ~ Daily Report of Well Operations ~ Well Schematic Diagram 15. Well Class after proposed work: o Exploratory ~ Development 0 Service 16. Well Status after proposed work: ~ Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL est 0 my nowle ge. Sundry Number or N/A if C.O. Exempt 306-111 7. I hereby certl Contact Printed Name Terrie Hubble Title Technical Assistant Phone 564-4628 Date 0Sj0'l 0 Prepared By Name/Number: Terrie Hubble, 564-4628 Submit Original Only I i- TREE - , MCEVOY e I W8...LHEAO = FMC 09-06 SAFEr ES: ***CHROMETBG & LNR*** ACTUA TOR = BAKER C KB. 8...EV = 54' BF. 8...EV = 0 PJC DRLG DRAFT \ I- r- KOP= 3401' H 30' H7' X 5-1/2" XO, 10:: 4.8921 Max Angle = 30 @ 4200' Datum MO = 9347' . I ~ --i 2088' H5-1/2" HES X NIP, ID = 4.562" I Datum NO = 8800' SS r¡, ~ 2152' H 9-5/8" HES ES CEMENTER, 10 - 8.835 I 19-5/8", CSG, 40#, L-80 TC11 TIEBACK, 10 = 8.835" 2165' ~~ -U ~ GAS LIFT MANOR8...S 113-3/8" CSG, 72#, MN-80, BUTT, 10 = 12.347" I 2715' ST MD NO OEV TYPE VLV LA TCH PORT DATE 4 3278 3275 9 MMG DCR-1 RK - 04/22/06 - 3 5617 5413 27 MMG OMY RK 0 04/22/06 Minimum ID = 4.562" @ 20SS' --.1= 2 6848 6515 26 MMG OMY RK 0 04/22/06 5-1/2" X NIP 1 7821 7400 23 MMG OMY RK 0 04/22/06 . I 7967' H5-1/2" HES X NIP, 10 = 4.562" I Z ~ 7988' H 9-5/8" X 5-1/2" BKR S-3 PKR I I I I 8013' 1-15-1/2" HES X NIP, ID = 4.562"1 I . 8073' H 5-1/2" HES XN NIP, 10 = 4¡455" I 15-1/2" TBG,17#, 13-CR VAM TOP, 8086' I 8086' 1- 5-1/2" WLEG .0232 bpf, ID = 4.892'''' I H 8...MD TT LOGGED , I TOP OF 5" LNR- TIEBA CK I 8149' I ~ 1 TOP OF 7" LNR I 8498' I 19-5/8" CSG, 47#, MN-80/S00-95, 8814' ¡4 ~ .0732 bpf, 10 = 8.681" '- 'r--1 PERFORA TION SUMMARY REF LOG: BHes ON 08/03/76 ANGLE AT TOP PERF: 11 @ 9207' "--' Note: Refer to Production DB for historical perf data SIZE I SPF I INTERVAL I Opn/Sqz I DATE ...--r SEE PAGE 2 FOR PERF BREAKDOWN "--' r- I PBm I 9527' I 5" LNR- TIEBACK, 18#, 13-CR-80, .0177 bpf, ID - 4.276" 9549' I 7" LNR. 29#, N-80, .0371 bpf, ID - 6.182" I 9648' I I m I 9665' I DATE REV BY COMMENTS DATE REV BY COMMENTS ffiUOHOE BAY UNfT 08/11/76 ORIGINAL COMPLETION W8...L: 09-06 10/22/91 LAST WORKOVER PERMfT No: '1760480 04/24/06 DOYON 14 RWO Apt No: 50-029-20216-00 09/27/05 EZLfTLH WAVIER SFTY NOTE D8...ETED see 1, T10N, R15E. 3926.34' F8... & 3542.45' FNL 04/30/06 ?I PJC DRLG DRAFT CORRECTIONS BP Exploration (Alaska) TREE = W8...LHEAD = ACTUA TOR = KB. 8...EV = BF. 8...EV = KOP= Max Angle = Datum MO = DatumTVO= MCEVOY FMC BAKER C 54' o 3401' 30 @ 4200' 9347' 8800' SS PERFORA TION SUMMARY REF LOG: BHCS ON 08/03/76 ANGLE AT TOP PERF: 11 @ 9207' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DATE 3-3/8" 1/2 9207 - 9214 0 10/27/91 3-3/8" 4 9216 - 9236 0 11/30/91 3-3/8" 1/2 9220 - 9283 0 10/27/91 3-3/8" 1/2 9223 - 9263 0 10/28/91 3-3/8" 4 9236 - 9283 0 10/27/91 3-3/8" 1/2 9243 - 9263 0 10/28/91 3-3/8" 1/2 9288 - 9310 0 11/09/91 4 9310 - 9320 S 10/16/91 4 9331 - 9346 S 10/16/91 3-3/8" 4 9354 - 9357 0 11/30/91 3-3/8" 4 9357 - 9367 0 11/29/91 4 9365 - 9371 S 10/16/91 3-3/8" 4 9377 - 9386 0 11/29/91 4 9389 - 9397 S 10/16/91 3-3/8" 4 9428 - 9450 0 10/27/91 4 9450 - 9455 S 10/16/91 3-3/8" 8 9475 - 9494 0 10/27/91 3-3/8" 8 9494 - 9514 0 10/27/91 DATE 08/11/76 1 0/22/91 04/24/06 09/27/05 04/30/06 REV BY COMMENTS ORIGINAL COMPLETION LAST WORKOVER DOYON 14 RWO EZLlTLH WAVIERSFTY NOTE08...ETED ?/ PJC DRLG DRAFT CORRECTIONS DATE REV BY 09-06 PERFS COMMENTS e PRUDHOE BAY UNrT W8...L: 09-06 PERMrT No: "1760480 API No: 50-029-20216-00 SEC 1, T10N, R15E, 3926.34' F8... & 3542.45' FNL BP Exploration (Alaska) Well: Field: API: Perm it: e e 04/10/06 N/A 04/23/06 Doyon 14 03/06/06 TAG 5 1/2" BY 41/2" TUBING XO AT 7978' SLM, W/4.5" CENT AND SB. NO RECOVERY IN SB. 09-06 Rig W orkover Prudhoe Bay Unit 50-029-20216-00-00 176-048 Accept: Spud: Release: Rig: 03/23/06 RUN 3.70" CENT AND 4.5" BLB THROUGH 4.5" XN NIPPLE AT 8,110' SLM. SET 4.5" PXN AT 8,110' SLM (96" PRONG 1 3/4" FN). WELL LEFT SI. 03/31/06 JET CUT 5.5" TBG AT 7958' WITH 4.15" SCP POWERJET CUTTER. CCL TO ME = 18.3 FT, STOP DEPTH = 7939.7'. GOOD SURFACE INDICATION. PULLED ADDITIONAL 230 LBS TENSION FOR FIRST 200' AFTER SHOT, THEN NORMAL TENSION. PRE-RIG WORK e e . BP EXPLORATION Page ·1of8 Operatio.nsSuromaryReport Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Daté From - To Höurs Task Code NPT Phase Description of Opèràtions 4/9/2006 12:00 - 14:00 2.00 RIGD P PRE PJSM - Skid rig floor - Move off well DS 16-21 14:00 - 17:00 3.00 MOB P PRE Move rig from DS 16-21 to DP 9-06 17:00 - 17:30 0.50 MOB P PRE Spot rig over well DS 9-06 17:30 - 19:00 1.50 RIGU P PRE PJSM - Skid rig floor to drill position - Berm & spot rock washer, hook up mud and servce lines 19:00 - 21 :30 2.50 RIGU P DECOMP RlU circulating lines to tree, prep rig - Accepted rig @ 1900 hrs 21 :30 - 23:00 1.50 RIGU P DECOMP Cut & slip drlg line - Service & lube TD and blocks 23:00 - 00:00 1.00 RIGU P DECOMP RlU bales and elevaters, perform derrick inspection 4/10/2006 00:00 - 02:00 2.00 RIGU P DECOMP Prep pits while waiting on seawater & tiger tank 02:00 - 03:30 1.50 RIGU P DECOMP Offload 585 bbls 120 deg. seawater into pits 03:30 - 04:00 0.50 RIGU P DECOMP Spot tiger tank & RU hard line to same 04:00 - 05:00 1.00 RIGU P DECOMP PJSM- RU Lubicator- Pull BPV 05:00 - 06:00 1.00 RIGU P DECOMP RU to displace diesel- Test lines 06:00 - 08:00 2.00 KILL P DECOMP Pump down annulus wI 90 bbls 120 deg. seawater taking returns out tubing- 3 bpm 400 psi- Pump down tubing w/160 bbls taking returns out annulus- 3 bpm 210 psi.- Recovered diesel freeze protect & seawater into tiger tank 08:00 - 09:30 1.50 KILL P DECOMP Circulate bottoms up taking returns into pits. 09:30 - 10:00 0.50 KILL P DECOMP Blow down pumps & lines- Rig down hard line 10:00 - 11 :00 1.00 DHB P DECOMP Install TWC- Test to 1000 psi- OK 11 :00 - 14:00 3.00 WHSUR P DECOMP ND Tree & adaptor flange- Replacel Rework LDS 14:00 - 17:30 3.50 BOPSUF P DECOMP PJSM- Nipple up 36" spacer spool- NU BOPE- Modify pitcher nipple 17:30 - 19:00 1.50 BOPSUF P DECOMP PJSM -C/O upper rams to 4 1/2" X 7" variables 19:00 - 20:00 1.00 BOPSUF P DECOMP RlU and test blind rams (250 psi low, 3500 psi high) 20:00 - 21 :30 1.50 WHSUR P DECOMP RlU lubricator - Pull TWC 21 :30 - 22:30 1.00 BOPSUF P DECOMP RlU crossover, test joint,and test equipment 22:30 - 00:00 1.50 BOPSUF P DECOMP Test BOPE (250 psi low, 3500 psi high) - Witness of test waived by AOGCC representative -John Crisp 4/11/2006 00:00 - 03:00 3.00 BOPSUF P DECOMP Cont Test BOPE, 250 psi low, 3500 psi high for 5 min each, (Witness of test waived by AOGCC representative - John Crisp) WSL witnessed all tests of BOP's 03:00 - 03:30 0.50 BOPSU¡:; P DECOMP RID test equipment - Blow down choke manifold, kill line, top drive 03:30 - 04:00 0.50 PULL P DECOMP M/U BHA #1, spear assembly - Spear hanger 04:00 - 05:00 1.00 PULL P DECOMP Mobilize control line spool & casing equip. to rig floor. Pull on hanger to 275k wI no movement. 05:00 - 06:00 1.00 PULL P DECOMP Inspect all LDS- Warm hanger w/ steam. 06:00 - 07:00 1.00 PULL P DECOMP Pull hanger free wI 225k- Pull to rig floor wI 200k up wt.- Circ. BU 07:00 - 07:30 0.50 PULL P DECOMP Mix & pump dry job 07:30 - 08:00 0.50 PULL P DECOMP LD spear assembly & 1 joint DP 08:00 - 09:00 1.00 PULL P DECOMP RU 7" compensator- Change bales- Hold PJSM and review RP on laying down chrome pipe. 09:00 - 15:00 6.00 PULL P DECOMP LD 7" 26# 13cr FOX tubing- Recovered 63 joints - 2 flow couplings - SSSV - 3 pup joints - 57 control line clamps 15:00 - 16:00 1.00 PULL P DECOMP Change over to 5 1/2" equipment 16:00 - 21 :30 5.50 PULL P DECOMP LD 5 1/2" 17# 13cr tubing - 119 joints - 2.78' cut off - 10 GLM's 21 :30 - 22:30 1.00 PULL P DECOMP Clear rig floor - LD slips - elevators - tongs - compensator - long bails 22:30 - 00:00 1.50 BOPSUF P DECOMP Install test plug - Change out top rams from 4.5" X 7" to 2 7/8" X 5" VBR" 4/12/2006 00:00 - 00:30 0.50 BOPSUF P DECOMP Fill stack - RU testing equipment Printed: 4/24/2006 9:40:39 AM e e BP EXPLORATION Page 2Qf 8 Operations Summary Report . Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Opørations 4/12/2006 00:30 - 03:30 3.00 BOPSUF P DECOMP Test plug not seating - Change out test plug - Plug not seating - Energize LDS - Retest rams to 250 low 3500 high - 5 mins each test - Record on chart - Test good - RD testing equipment - Pull test plug - Install wear ring - LD test joint 03:30 - 04:30 1.00 FISH P DECOMP Moblize Baker fishing tools - PU short bales - elevators 04:30 - 06:30 2.00 FISH P DECOMP MU Baker fishing tools- PU DC's from shed 06:30 - 12:00 5.50 FISH P DECOMP PU 4" DP to 7940' 12:00 - 12:30 0.50 FISH P DECOMP Break circ.- Obtain parameters- PU 200k- SO 162k- Engage fish at 7958'- Pull to 250k and bleed jars- seals came free- Pull 20' to clear seals (observed slight overpull). 12:30 - 14:00 1.50 FISH P DECOMP Circ. bottoms up - 6 bpm 630 psi. 14:00 - 16:30 2.50 FISH P DECOMP POH wI fish from 7958' to 413' @ BHA 16:30 - 18:00 1.50 FISH P DECOMP Stand back DC's - LD fish - Spear 18:00 - 19:30 1.50 FISH P DECOMP MU 8 1/2" bit - 9 5/8" scraper - DC's - Jars - Intensifier 19:30 - 22:30 3.00 FISH P DECOMP RIH from 410' to 7976' - Wash down last single to 8007' tag top of packer - PUW 200 - SOW 162 22:30 - 23:00 0.50 FISH P DECOMP Rig service - Top drive - Crown - Blocks- 23:00 - 00:00 1.00 FISH P DECOMP PJSM - RU to displace well with 120 degree seawater - Mix sweep 4/13/2006 00:00 - 00:30 0.50 FISH P DECOMP PJSM - Displace seawater - Installing 2nd annulus valve on well head - Testing casing 00:30 - 01 :30 1.00 FISH P DECOMP Displace well with 120 deg seawater - Pump 30 bbl hi-vis sweep - @ 4.5 bpm 330 psi - Followed by 625 bbls 120 degree seawater - 10 bpm @ 1440 psi 01 :30 - 02:00 0.50 FISH P DECOMP Pull one stand - Blow down top drive - RU to test casing to 3500 psi 02:00 - 03:00 1.00 EVAL P DECOMP Test 95/8" casing to 3500 psi - Record on chart - Hold for 30 mìns - Test good 03:00 - 03:30 0.50 FISH P DECOMP Rig down testing equipment - Blow down choke manifold - Kill line- Pump dry job- Blow down Top Drive 03:30 - 06:30 3.00 FISH P DECOMP POH to to BHA (410') 06:30 - 08:00 1.50 FISH P DECOMP Change elevators- Stand back DC's- LD sraper, bit & jars. 08:00 - 08:30 0.50 FISH P TIEB1 Clear rig floor- PJSM on installing shooting flange. 08:30 - 09:30 1.00 FISH P TIEB1 ND pitcher nipple & flowline- NU shooting flange. 09:30 - 11 :00 1.50 EVAL P TIEB1 PJSM w/ Crew & SWS personnel- Mobilize E-line tools to rig floor 11 :00 - 13:30 2.50 EVAL P TIEB1 RU E-line & lubricator- RU logging tools- Run through small flange- Install 6.75" USIT tool- Lower through rotary table- USIT tool would not fit through large flange. ND large flange run e-line through & install US IT tool. RIH w/logging tools to 200'. 13:30 - 16:00 2.50 EVAL P TIEB1 Attempt to press. test- Troubleshoot leaks (Lubricator- packoff)- Test to 1000 psi- OK 16:00 - 21:30 5.50 EVAL P TIEB1 RIH w/ USIT logging tools to 8000'- Log up in cement evaluation/corrosion mode to 2800'- Log up fl 2800' to surface- TOC- WLM 2264' - Top packer WLM 2265 - Btm packer WLM 2280 - Top cement stringers WLM 2180' 21 :30 - 00:00 2.50 EVAL P TIEB1 PJSM - RD shooting flange - Schlumberger pressure control equipment / sheave - LD same 4/14/2006 00:00 - 00:30 0.50 EVAL P TIEB1 NU Riser - Flow line - Fill flow line check for leaks 00:30 - 01 :00 0.50 EVAL P TIEB1 Move DC's from off drillers side to drillers side 01 :00 - 01 :30 0.50 DHB P TIEB1 PU I MU 9 5/8" HES RBP - RIH w/ RBP 01 :30 - 03:00 1.50 DHB P TIEB1 RIH w/4" DP to 2544' Printed: 4/24/2006 9:40:39 AM e e BPEXPLORATION Page 3 of8 Operations SurnmaryReport Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From-To Hours Task Code NPT Phase Description of Operations -'- '. 4/14/2006 03:00 - 03:30 0.50 DHB P TIEB1 Set 9 5/8" RBP at 2544' 03:30 - 04:00 0.50 DHB P TIEB1 Displace well wI warm 9.8 ppg brine- 200 bbls total 04:00 - 04:30 0.50 DHB P TIEB1 POH 1 stand - RU to test RBP 04:30 - 05:30 1.00 DHB P TIEB1 Pump through lines- Test against RBP wI 2500 psi f/15 min.- Test good 05:30 - 07:30 2.00 DHB P TIEB1 POH wI running tool- LD same 07:30 - 09:30 2.00 DHB P TIEB1 Change elevators- PU 1 joint 7" casing & set in rotary- Dump 2200# 20/401 sand on top of RBP 09:30 - 14:00 4.50 BOPSUF P TIEB1 ND BOPE & choke hose- Remove spacer spool- NU BOPE & choke hose 14:00 - 14:30 0.50 BOPSUF P TIEB1 Pull wear ring- Install test plug- RU to test breaks- 14:30 - 15:00 0.50 BOPSUF P TIEB1 Test all breaks on BOPE- 250 psi low- 3500 high for 5 min. each- Record on chart- Test good 15:00 - 15:30 0.50 FISH P TIEB1 Mobilze M.S. Cutter to rig floor- PJSM wI all personnel involved wI task 15:30 - 16:00 0.50 FISH P TIEB1 PU BHA - MU Baker casing cutter - stablizer 16:00 - 18:00 2.00 FISH P TIEB1 RIH to 2189' - Break circ - Test RBP I casing to 2500 for 10 mins - test good 18:00 - 19:30 1.50 FISH P TIEB1 Locate collar @ 2145' - PU to 2125' - Cut 9 5/8" casing - RPM 70 - TQ 5 to 10 - GPM 212 - PP 1840- 19:30 - 21:00 1.50 FISH P TIEB1 Pump 30 bbls Hi-vis sweep - 150 bbls seawater - 30 bbls 9.8 brine - Taking returns to tiger tank - GPM 190 - PP 980 - 187 freeze protection bbls to tank 21 :00 - 22:30 1.50 FISH P TIEB1 PJSM - RU hot oil truck - Pressure test lines to 3000 psi - Pump 130 bbls 130 degree diesel @ 2.5 bpm at 1200 psi- Followed by 30 bbls 120 degree seawater @ 4 bpm at 22:30 - 00:00 1.50 FISH P TIEB1 Shut in annulus - Diesel soak 13 3/8" X 9 5/8" annulus 4/15/2006 00:00 - 03:30 3.50 FISH P TIEB1 PJSM circulating out diesel - Displace diesel out of OA with seawater - BPM 4.7 - PP 1300 - Followed by 70 bbls diesel- 2.2 bpm @ 1000 PSI - Followed with 30 bbl hi-vis sweep - 200 bbls seawater 5 bpm @ 1340 psi - followed by 180 bbls 9.8 brine 8 bpm 2900 psi - Check for pressure - Open rams - Pump 20 bbls 9.8 ppg brine to clear 5 to 7 bbls of diesel - Blow down kill line - Cement line - RD circulating lines - 03:30 - 06:00 2.50 FISH P TIEB1 POH from 2100' to BHA - LD stablizer - casing cutter 06:00 - 07:30 1.50 FISH P TIEB1 LD BHA - Cutter assy - Clear floor 07:30 - 09:00 1.50 BOPSUF P TIEB1 Change top rams from 2 7/8" X 5" VBR's to 9 5/8" Casing rams 09:00 - 09:30 0.50 BOPSUF P TIEB1 RU testing equipment - Test door seals to 1500 psi - Test good 09:30 - 11 :30 2.00 WHSUR P TIEB1 Retrieve 9 5/8" pack off - pull 20K 11:30 -12:30 1.00 FISH P TIEB1 MU spear assy on DP - Pull up on casing- Pipe free wI 135k up wt. 12:30 - 14:30 2.00 WHSUR P TIEB1 PJSM-Split BOP at wellhead- Pull up & remove emerg. slips- Set down BOP- NU same 14:30 - 15:00 0.50 FISH P TIEB1 PJSM- Mobilize casing equip. to rig floor 15:00 - 16:30 1.50 FISH P TIEB1 Pull casing to rig floor- LD spear- LD 9 5/8" 47# NSCC casing - RU casing tools to LD 9 5/8" casing 16:30 - 20:30 4.00 FISH P TIEB1 PJSM - LD 53 joints 9 5/8" 47# L-80 NSCC casing 20:30 - 21 :30 1.00 FISH P TIEB1 Clear floor - LD casing equipment 21 :30 - 22:30 1.00 FISH P TIEB1 Break 9 5/8" spear from cut joint - LD - Break 7" spear down - LD same 22:30 - 00:00 1.50 BOPSUF P TIEB1 PJSM - Install test plug - Change out casing rams to VBR's 2 7/8" x 5" - RU testing equipment - Test to 250 low - 3500 high - Chart on recorder - 5 mins each test - Test good Printed: 4/24/2006 9:40:39 AM e e BP EXPLORATION Page 4 of 8 Op,rations Summary Reþort Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/16/2006 00:00 - 01 :00 1.00 BOPSUF P TIEB1 Test top rams - lower flange break - 250 low - 3500 high - 5 mins each test - Test good - RD testing equip - Shut annulus valves - Pull test plug 01 :00 - 02:30 1.50 FISH P TIEB1 MU BHA - 13 375" csing scraper assy 02:30 - 04:00 1.50 FISH P TIEB1 TIH - Reverse circ @ 1000' 8.5 bpm @ 460 psi 90 bbls - Con't RIH to 2125' 04:00 - 05:00 1.00 FISH P TIEB1 Break circulation 5 bpm @ 500 psi - Reverse circ 300 bbls - 9 bpm @ 720 psi - 05:00 - 06:00 1.00 FISH P TIEB1 Flow check - Pump dry job - POH 06:00 - 07:30 1.50 FISH P TIEB1 Stand back - LD BHA 07:30 - 08:00 0.50 FISH P TIEB1 Moblize BHA to rig floor 08:00 - 09:30 1.50 FISH P TIEB1 MU BHA Baker 9 5/8" Back off tool 09:30 - 12:00 2.50 FISH P TIEB1 RIH to 9 5/8" casg collar 2160' 12:00 - 13:00 1.00 FISH P TIEB1 Set slips on back off tool - Initial break out 3480 psi = 34,800 ftlbs - Backed off casing 5 turns - Release tool 13:00 - 15:00 2.00 FISH P TIEB1 POH from 2160' - Service break BHA - Stand back collars 15:00 - 16:00 1.00 FISH P TIEB1 Clear floor - LD Baker tools - MU Spear assy 16:00 - 18:30 2.50 FISH P TIEB1 RIH to 2125 - Engage fish - Back out casing stump - POH 18:30 - 19:00 0.50 FISH P TIEB1 RU 350 ton slips - LD casing stump - 40' 9 5/8" casing with collar on bottom of joint 19:00 - 20:30 1.50 BOPSUF P TIEB1 PJSM - Install test plug - Change top rams from 2 7/8" X 5" VBR's to 9 5/8" casing rams - Body test doors to 1500 psi - Record on chart 20:30 - 23:00 2.50 CASE P TIEB1 RU 95/8" casing equipment - Tongs - change bales - compensator - set 350 ton slips - Moblize to rig floor cement head - ES Cementer - Pup jt with triple conn tool and baffle - screw in sub - centralizers 23:00 - 00:00 1.00 CASE P TIEB1 PJSM - Make up XO joint - ES Cementer - Screw in triple conn tool with baffle 4/17/2006 00:00 - 07:30 7.50 CASE P TIEB1 Make up cut lip guide on triple conn tool - PJSM - Run 9 5/8" casing wI compensator & torque turn - Fill each joint with hose - total run 54 joints 9 5/8" L-80 TC11 40# 07:30 - 08:30 1.00 CASE P TIEB1 RU crossover fl casing to TOP Drive- 08:30 - 09:00 0.50 CASE P TIEB1 Obtain parameters- Tag top of casing stub at 2165'· Rotate wI 10 rpm & screw into casing w/1 Ok torque- Work torque down hole pulling 25k over & 25k down wt. several times- Torque pipe again (1/2 turn) to 10k ftflb. Work torque down w/75k over & 50k down- Torque to 10k ftflb. Casing tight- Pull test casing to 250k-OK 09:00 - 09:30 0.50 CASE P TIEB1 Pressure test casing to 2000 psi f/30 min. wI 250k pulled- Test good 09:30 - 10:00 0.50 CASE P TIEB1 Pressure to 3300 psi to open HES Cementer- Circ. casing volume (165 bbls) wI 9.8 ppg brine. 10:00 -11:00 1.00 CASE P TIEB1 RD crossover fl Top Drive- RU Cement head 11:00-12:00 1.00 CASE P TIEB1 Circulate wI brine- Batch mix 15.8 ppg class "G" cement. 12:00 - 14:00 2.00 CEMT P TIEB1 PJSM- Turn over to Schlumberger- Pump 5 bbls water- Test lines to 3500 psi- Pump 148 bbls class "G" cement - 5 bpm 100 psi- Drop closing plug- Kick out wI 15 bbls water- Displace wI rig pumps & 9.8 ppg brine wI 6 bpm- Slow pumps to 2.5 bpm 800 psi- Bump plug & close ES Cementer wI 1790 psi- Bleed press. & check floats- OK- CIP @ 1330 hrs. 14:00 - 15:00 1.00 CEMT P TIEB1 Flush stack with fresh water through lower I upper annulus valves - RD cement head - Cement lines - Remove choke line - Printed: 4/24/2006 9:40:39 AM e e BPEXPLORATION Page 5.of8 Operations. Summary Report Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations , 4/17/2006 14:00 - 15:00 1.00 CEMT P TIEB1 ND I Split stack @ intermediate casing head 15:00 - 21 :00 6.00 WHSUR P TIEB1 Install emergency slips - 100K set on slips - Cut casing - LD cut off joint 34.12' - Attempt to install FMC 9 5/8" pack-off - Could not get pack-off down - Pull pack-off check seals - OD of casing 9.72 - Seal spacer rings on pack-off 9.625 - FMC brought out over sized seals I rings - Replace seals I rings in pack-off - RILDS - Attempt to test pack-off - No test - No pressure build up - FMC to bring new seals for pack-off 21 :00 - 22:00 1.00 BOPSUF P TIEB1 NU stack - Choke - Clear rig floor - LD casing equipment - Long bails 22:00 - 23:30 1.50 BOPSUF P TIEB1 Install test plug - Change out 9 5/8" casing rams to 2 7/8" X 5" VBR's - RU testing equipment 23:30 - 00:00 0.50 BOPSUF P TIEB1 Fill stack with water - Body test stack to 250 low - 3500 high 4/18/2006 00:00 - 02:30 2.50 BOPSUF P TIEB1 Test BOP's - Annular - Upper rams - Choke valves 4,5,6,7,8, 9, 10, 12, valve # 11 failed test - Floor valve - Dart valve - IBOP - ManuallBOP - 250 low 3500 high - 5 mins each test - Right to witness test waived by AOGCC rep. Jeff Jones- Suspend bop test to pull 9 5/8" pack-off 02:30 - 03:00 0.50 BOPSUF P TIEB1 RD testing equipment - Pull test plug - 03:00 - 05:30 2.50 BOPSUF P TIEB1 Pick up pack-off puller - RIH - BOLDS - Pull pack-off - Inspect same - Found Top S-seals cut - Bottom non exstrution rings were shredded and rolled over - Replace all seals upper I lower - RIH - Pack-off taking weight on intermediate spool - Did not push with top drive to prevent damaging seals - Pull back out - Split I Nipple down stack @ intermediate spool - Install pack-off. 05:30 - 07:30 2.00 BOPSUF P TIEB1 NU BOPE- Attempt to test pack off wI no success (Appears to be leaking through top seals into tubing spool)- NOTE: UCA from Schlumberger lab showed a compressive strength of 1100 psi @ 14 hrs. 07:30 - 10:30 3.00 BOPSUF P TIEB1 ND BOPE- Change out tubing spool- Test 9 5/8" packoff to 2400 psi f/10 minutes. 10:30 - 11 :30 1.00 BOPSUF P TIEB1 NU BOPE - Rebuild choke valve # 11 11:30 -15:30 4.00 BOPSUF P TIEB1 Con't BOP test - RU testing equipment - Test Choke valves # 11, 2, 3 - HCR Kill I Choke - Manual Kil!l Choke - Btm rams - Blind rams - Perform accumulator test - All test good - RD testing equipment - Pull test plug - Install wear ring - Jeff Jones waived witness of BOP test 15:30 - 17:00 1.50 DRILL P TIEB1 Moblize BHA to rig floor - MU 8 1/2" bit - 3 Junk baskets - 9 5/8" casing scraper - Jars - DC's - Intensifier 17:00 - 18:00 1.00 DRILL P TIEB1 RIH from 424' to 2142 - Taking weight - POW150 - SOW 150- ROTW -150 18:00 - 21:00 3.00 DRILL P TIEB1 Drill cement - Tag Closing plug @ 2151' - Drill closing plug - ES cementer - Cement - Opening plug - Baffle collar @ 2163'- WOB 3 TO 5 - RPM 80 - TQ 1 TO 2 - GPM 385 - PP 600 21 :00 - 23:00 2.00 DRILL P TIEB1 Pump HI-vis sweep - GPM 385 - PP 600 - RIH tag top of sand @ 2487' - Pump Hi-vis sweep - Displace with seawater 23:00 - 00:00 1.00 DRILL P TIEB1 RU test equipment - Test 95/8" casing to 3500 psi for 30 mins - Record on chart 4/19/2006 00:00 - 00:30 0.50 FISH P TIEB1 Pump dry job - Blow down Kill line I Top Drive 00:30 - 01 :30 1.00 FISH P TIEB1 POH 01 :30 - 02:00 0.50 FISH P TIEB1 LD BHA - MU reverse basket 02:00 - 03:00 1.00 FISH P TIEB1 Close Blinds retest 9 5/8" casing to 3500 psi for 30 mins record Printed: 4/24/2006 9:40:39 AM , BP EXPLORATION Page60f 8 OperationsSurn.rnary Report Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/19/2006 02:00 - 03:00 1.00 FISH P TIEB1 on chart - Blow down choke - kill line 03:00 - 04:30 1.50 FISH P TIEB1 RIH to 2487' - Confirm top sand - PU to 2465' 04:30 - 05:00 0.50 FISH P TIEB1 Break circ - Circ pipe vol 2 X @ 8.5 bpm 660 psi - Drop ball let seat 05:00 - 07:00 2.00 FISH P TIEB1 RIH to 2486' - Reverse circulate - Wash I circulate sand out from 2487 to 2530 - Pump sweeps - GPM 400 - PP 2900- RPM 30 - TO 1K - PUW 110 SOW 110 - ROTW 110 07:00 - 08:00 1.00 FISH P TIEB1 POH 08:00 - 09:00 1.00 FISH P TIEB1 LD reverse jet basket - Recovered shut off baffle - Nose to the closing plug - Misc pieces of metal I cement - MU HOWCO RBP Retrieving tool 09:00 - 10:00 1.00 FISH P TIEB1 RIH to 2530 top of sand 10:00 - 11 :30 1.50 FISH P TIEB1 Reverse circulate @ 2350 - 8 bpm - PP 780 psi - Circulate Hi-vis sweep surface to surface while washing down to top RBP @ 2540' - 5 to 8 bpm - PP 650 to 1500 11 :30 - 12:00 0.50 FISH P TIEB1 Latch onto RBP - Pull free - 12:00 - 12:30 0.50 FISH P TIEB1 Con't CBU - GPM 345 - PP 320 - Monitor well - Well static - Pump dry job 12:30 - 14:00 1.50 FISH P TIEB1 POH from 2540' with RBP - LD RBP I running tool 14:00 - 15:00 1.00 FISH P TIEB1 PJSM - MU BHA - Milling assy - Boot baskets - Jars - Collars - Intensifier 15:00 - 18:00 3.00 FISH P TIEB1 RIH from 445' to 8007' - Wash last to bottom - PUW 195- SOW 165 - ROT 180 18:00 - 21:30 3.50 FISH P TIEB1 Mill packer from 8007 to 8008.5 - WOM 8 to 30 - RPM 85 - TO 8 to 11 - GPM 500 to 425 - PP 2250 to 1700 - @ 8008.5' torque steady @ 5K - No drill off - PU over pull 30K - Work packer up hole with 30 to 50K over pull - Work free to 7888' - Lost 210 bbls seawater while milling packer - Started @ 80 bbls hour tapering off to 20 bbls hour then to no losses - Gas bubble to surface - Monitor well - Well static - Pump dry job - Blow down top drive 21 :30 - 22:30 1.00 FISH P TIEB1 Monitor well for 30 mins - Well static - Pump dry job - Blow down top drive 22:30 - 00:00 1.50 FISH P TIEB1 POH from 7888' to 5742' - Various over pulls 20 to 50K on trip out 4/20/2006 00:00 - 04:00 4.00 FISH P TIEB1 POH from 5742' to 445' @ BHA - (Various tight spots with over pulls 20 to 50K - 2335' Had to jar thru tight spot - 2360 work thru without jarring - but could not go back thru that depth) 04:00 - 06:00 2.00 FISH P TIEB1 Stand back BHA - Stand back DC's - Recovered packer - Left tail pipe assy in hole - LD fish 06:00 - 07:30 1.50 FISH P TIEB1 Clear rig floor - Moblize BHA - MU spear w/5.008 grapple 07:30 - 08:00 0.50 FISH P TIEB1 Wait on tools 08:00 - 09:00 1.00 FISH P TIEB1 Con't MU BHA 09:00 - 11 :30 2.50 FISH P TIEB1 RIH to 7990' 11 :30 - 12:00 0.50 FISH P TIEB1 Wash down to top of fish @ 8024' - PU 190 - SO 170 - 6 bpm - PP 860 - PU did not catch fish - Wash back down to 8031'- PSI increased to 1000 psi - PU 235 Fish on - Lost circulation - Pump 10 bbls every 15 mins 12:00 - 15:00 3.00 FISH P TIEB1 Monitor well - Shoot fluid levels - depths 1374 - 1274 - 1332 - Fill 6 bbls level 1554' - Pull 10 stands - Fill 6 bbls level 1548' - Pull 1 0 stands fill 6 bbls - Level 1554' 15:00 - 18:00 3.00 FISH P TIEB1 POH from 6103' to 431' - Filling 10 bbls every 5 stands 18:00 - 19:30 1.50 FISH P TIEB1 LD BHA - Fish recovered - Seal bore extension - mill out e e Printed: 4/24/2006 9:40:39 AM e e BP EXPLORATION Page Tot8 Operations Summêlry Report Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description otOperations 4/20/2006 18:00 - 19:30 1.50 FISH P TIEB1 extension - Otis coupling 6 5/8" X 4 1/2" - 4 1/2" Pup jt - 2 joints 41/2" tubing - 4 1/2" Pup jt - 4 1/2" Otis XN nipple - 41/2" Pup jt - 41/2" WLEG - (138') 19:30 - 20:00 0.50 FISH P TIEB1 Clear rig floor - PJSM 20:00 - 21 :00 1.00 FISH P TIEB1 MU BHA - Bit - 3 boot baskets - 9 5/8" Scraper - Jars - DC's 21 :00 - 00:00 3.00 FISH P TIEB1 RIH from 424' to 8143' tag TOL - PUW 205 - SOW 172 - Con't fill 10 bbls every 15 mins 4/21/2006 00:00 - 02:00 2.00 FISH P TIEB1 Stand back 27 stands 4" DP 02:00 - 06:00 4.00 FISH P TIEB1 LD 4 " Drill pipe 06:00 - 08:00 2.00 FISH P TIEB1 LD BHA 08:00 - 08:30 0.50 FISH P TIEB1 Clear rig floor of Baker tools 08:30 - 09:00 0.50 FISH P TIEB1 MU Howco Circulating sub - RTTS 09:00 - 10:00 1.00 FISH P TIEB1 RIH with RTTS to 2544' 10:00 - 11 :00 1.00 FISH P TIEB1 Set RTTS - Close circulating sub - Fill annulus with seawater - 87 bbls = 1440' void footage - let air migrate to surface 11 :00 - 12:00 1.00 FISH P TIEB1 Before test casing - Decision made to run Howco closing tool - to make sure FOC's are closed - POH 12:00 - 12:30 0.50 FISH P TIEB1 PU Howco closing tool on btm of RTTS 12:30 - 14:00 1.50 FISH P TIEB1 RIH to 2339' - Attempt to close FOC with all Drill pipe weight + 10K block weight - FOC did not appear to close 14:00 - 15:00 1.00 FISH P TIEB1 Pull out of hole - Stand back DP 15:00 - 15:30 0.50 FISH P TIEB1 LD BHA - RTTS - Circulating sub 15:30 - 16:00 0.50 FISH P TIEB1 CO Handling equipment from 4" to 5" - Moblize BHA to rig floor 16:00 - 17:30 1.50 FISH P TIEB1 MU BHA - Single in hole with 12/61/2" DC's to 383' - Change handling equip fro 5" to 4" 17:30 - 19:00 1.50 FISH P TIEB1 RIH to 2338' - Close upper FOC - taking weight 15 to 40K each time going through - Turn 1/4 each time slack off still taking weight but falling off - RIH to 2470' - Close lower FOC again same thing each time slack off through FOC take 15 to 30K then fall off - work 4 times with same results - Pull back to upper FOC - work 4 times 1/4 turn each time with same results - HES operator feels FOC's are closed 19:00 - 20:00 1.00 FISH P TIEB1 POH with Howco closing tool from 2339' to 383' - Stand back Dp 20:00 - 21 :00 1.00 FISH P TIEB1 LD DC's - Closing tool 21 :00 - 21 :30 0.50 FISH P TIEB1 Clear rig floor of all tools 21 :30 - 22:00 0.50 FISH TIEB1 Make up Circulating valve - RTTS 22:00 - 00:00 2.00 FISH P TIEB1 RIH to 2544' - @ Controlled speed - Set RTTS - Close circ sub - Fill annulus - 90 bbls - Let air migrate to surface 4/22/2006 00:00 - 01 :30 1.50 FISH P TIEB1 Test 9 5/8" casing to 3500 psi for 30 mins - record on chart- Blow down choke - kill line 01 :30 - 02:00 0.50 FISH P TIEB1 Open circulation sub - Release RTTS - 02:00 - 03:30 1.50 FISH P TIEB1 Blow down Choke - Kill line - Rig service - Cut Drlg line - Service Top drive - Rig 03:30 - 04:30 1.00 FISH P TIEB1 POH 04:30 - 05:00 0.50 FISH P TIEB1 LD Circulating sub - RTTS 05:00 - 06:30 1.50 FISH P TIEB1 Clear floor - Change top rams to 41/2" X 7" - Test door seals to 1500 - Test good 06:30 - 08:00 1.50 RUNCOI fP RUNCMP RU tubing equipment 08:00 - 21 :30 13.50 RUNCO ~ RUNCMP PJSM - Run 13 CR 51/2" L-80 17 # Tubing @ 8051 21 :30 - 22:00 0.50 RUNCO RUNCMP Change out handling equipment from 5 1/2" to 5" - Clear rig floor 22:00 - 22:30 0.50 RUNCOI fP RUNCMP PU 5" DP - MU XO's Printed: 4/24/2006 9:40:39 AM I .. e e BP EXPLORATION Page Bof 8 Operations Summary Report , Legal Well Name: 09-06 Common Well Name: 09-06 Spud Date: 7/2/1976 Event Name: WORKOVER Start: 4/8/2006 End: Contractor Name: DOYON DRILLING INC. Rig Release: 4/23/2006 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/22/2006 22:30 - 23:00 0.50 RUNCO! P RUNCMP MU Hanger - Land @ 8086' - RILDS 23:00 - 00:00 1.00 RUNCO! P RUNCMP RU circulating lines - Pump 350 bbls of Inhibited seawater in annulus 3 bpm 170 psi 4/23/2006 00:00 - 02:00 2.00 RUNCO! P RUNCMP Pump 350 bbls inhibited seawater - 3 bpm @ 160 psi inhibited seawater- 3bpm @ 180 psi 02:00 - 02:30 0.50 RUNCO! P RUNCMP Drop ball - WOB for 20 mins 02:30 - 04:00 1.50 RUNCO! P RUNCMP Fill tubing with 30 + bbls - Lubricate bleed untill air out - Tubing full 04:00 - 08:00 4.00 RUNCm p RUNCMP Test tubing to 3500 psi - lost 200 psi 10 mins - Bump up 3525 lost 225 psi 10 mins - Bump up to 3550 lost 220 psi 10 mins- Bleed down to 1500 psi - Fill annulus with 66 bbls - Lubricate bleed air out of annulus - Bleed off pressure on tubing - Break off cement hose - Break off swivel on head pin - Check to see if tubing full - Tubing full - Make up cement line - Retest tubing to 3500 psi - lost 800 psi in 30 mins - Bleed tubing down to 2000 psi - Test annulus to 3500 for 30 mins - Tubing came up to 2500 psi after 30 mins Tubing to 2800 psi - Annulus 3300 psi - After 55 mins tubing 3000 psi - Annulus 3200 psi - Bleed off tubing shear DCK valve 08:00 - 09:00 1.00 RUNCm p RUNCMP RD line - Blow down lines to stack and landing joint - Drain stack 09:00 - 09:30 0.50 RUNCm p RUNCMP Install TWC and test from the btm to 1000 psi 09:30 - 11 :00 1.50 RUNCm p RUNCMP ND BOP's 11 :00 - 14:30 3.50 RUNCm ~ RUNCMP NU Tree 14:30 - 15:00 0.50 RUNCm RUNCMP Test tubing Adapter and Hanger to 5K for 10 mins - Good test 15:00 - 15:30 0.50 RUNCm p RUNCMP RU to test tree - Test 5K for 10 mins - Record on chart - Test good 15:30 - 16:30 1.00 RUNCm ~ RUNCMP RU lubricator - Pull TWC 16:30 - 17:00 0.50 RUNCm RUNCMP RU - Hot oil - Hold PJSM with hot oil 17:00 - 18:00 1.00 RUNCm p RUNCMP Pressure test lines to 2500 psi - Pump 135 bbls diesel - 2.5 bpm 18:00 - 19:00 1.00 RUNCm p RUNCMP U-tube 1 hr 19:00 - 20:00 1.00 RUNCm p RUNCMP Suck back lines - Install Lubricator - Install BPV - Test to 1000 psi 10 min test - test good - Suck back lines 20:00 - 22:00 2.00 RUNCm p RUNCMP RD Hot oil - Secure well - Release rig @ 22:00 hrs Printed: 4/24/2006 9:40:39 AM <I. J 1. e e ~1f~1TŒ LID~ [f\ III \ IÜ. 111.... FRANK H. MURKOWSKI, GOVERNOR A I,ASIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE. SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 PaulChan Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU 09-06 Sundry Number: 306-111 î b' () l.\; \1 Dear Mr. Chan: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED thiJ!fday of March, 2006 Encl. , ~3fzA(D0 ~f¿ W(¡v\- ~JZ4llßO~ ... U~;J e STATE OF ALASKA ,,/2--. RECEIVED .~'r.Ÿ' ALASKA OIL AND GAS CONSERVATION COMMISSION '. . ,.\ APPLICATION FOR SUNDRY APPROVAL MAR 2 ~1 ZOOo ø {1:r ""3/ ¿ ?-(c 20 AAC 25.280 Alaska Oil & Gas Cons. Commission " 1. Type of Request: 0 Abandon o Alter Casing o Change Approved Program o Suspend / 0 Operation Shutdown 11II Repair Well 0 Plug Perforations 11II Pull Tubing 0 Perforate New Pool o Perforate 0 Other o Stimulate 0 Re-Enter Suspended Well o Waiver 0 Time Extension '1;1" .. 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: / 1m Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 176-048 ,/ 6. API Number: / 50- 029-20216-00-00 99519-6612 54' 9. Well Name and Number: PBU 09-06 ./ 8. Property Designation: 11. Total Depth MD (ft): 9655 Casino ~trllr.tllr::ll 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): 9162 9527 / 9036 Length Size MD I TVD Plugs (measured): None Burst Junk (measured): None Collacse ADL 028327 78' 20" 78' 78' 1530 520 2715' 13-318" 2715' 2715' 5380 2670 8814' 9-5/8" 8814' 8337' 6870 4760 I inør 1150' 7" 8498' - 9648' 8036' - 9155' 8160 7020 Liner 1400' 5" 8149' - 9549' 7706' - 9057' 10140 10490 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: ./ 9207' - 9514' / 8721' - 9023' 7",26#/5-1/2',17#/4·1/2',12.6# Packers and SSSV Type: 9-5/8" x 4-1/2" Otis 'HB' packer; 7" Otis 'RQ' SSSV Tubing Grade: 13Cr80 / L-80 Packers and SSSV MD (ft): 8007'; 2159' I Tubing MD (ft): 8145' ./ / 12. Attachments: 1m Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: ./ o Exploratory 1m Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name ~L..Ch~ (" . Title Drilling Engineer Sionature ~-~ ( ~ Phone 564-5254 ~ Commission Use On Iv APÄi 2006 I:>ªfe: 15. Well Status after proposed work: 1m Oil 0 Gas o WAG 0 GlNJ o Plugged DWINJ o Abandoned o WDSPL Contact Paul Chan, 564-5254 Date 3 23/ oJ.. Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity ~OP Test 0 Mechanical Integrity Test 0 Location Clearance I Sundry Number: 3£X.p _ I ( I Other: Te..-s. t Eo PE- to ~50o pvt. """'''''on' "",m A",,;,.., \ 0 - 4 0 .I. ? /. Approved By: ( /.-JJ §, '/¿ Form 10-403 Revised 07/2005 \~. Kr;' 0 V/ Of<I·~(/L APPROVED BY COMMISSIONER THE COMMISSION \0. RBDMS BFL MAR 2 8 Z006*~ '" Date 3 'l~Oh Submit In Duplicate .. e e G 9-06 proposed Ria Workover Procedure 1. During the pre-rig work, a plug will be set in the XN nipple in the current 4-1/2" completion at 8132' MD, the tubing will be cut at 7958' MD and a SPV will be placed in the tubing profile. 2. MIRU. NO tree. NU and test BOPE to 3500 psi. Circulate out freeze protection fluid and circulate well to clean seawater through the cut. 3. Pull and lD tubing string to the cut at 7958' MD. 4. Run USIT to determine top of cement in 9-5/8" x 13-3/8" annulus. 5. Cut and pull 9-5/8" casing. Backoff 9-5/8" casing stub. 6. Run 9-5/8" casing and cement to surface. Pressure test casing to 3500 psi for 30 minutes. /" 7. Cleanout 9-5/8" casing. 8. Mill and retrieve the Otis HB packer. 9. Run bit x scraper to Tal at 8149' MD. 10. Run 5-1/2" 13Cr80 completion with Baker S-3 packer. Set packer at -7950' MD. /' 11. Displace the IA to packer fluid and set the packer. 12. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD./ 13. Set BPV. NO BOPE. NU and test tree. RDMO. / TREE = ' vELLHEÞ,.D = ACTUATOR = KB.ELBI = BF. ELBI = KOP= Max Angle = Datum MD = Datum TVD = 9"'" Proposed Compttion MCBlOY FMC BAKER C 54' o 3401' 30 @ 4200' 9347' 8800'SS I EsrD TOC H Surface I 9-S/8" CSG, 47#, TC-II L-80 .0732 bpf, ID = 8.681" 113-3/8" CSG, 72#, MN-80, BUlT, ID = 12.347" 5-1/2" TBG,17#, 13-CR80, .0232 bpf, ID = 4.892" I TOP OF S" LNR- TIEBACK I TOP OF 7" LNR I 8149' 8498' 9-S/8" CSG, 47#, MN-80/S00-9S, .0732 bpf, ID = 8.681" ÆRFORA TION SUMMARY REF LOG: BHCS ON 08/03/76 ANGLEAT TOP ÆRF: 11 @ 9207' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE SEE PAGE 2 FOR ÆRF BREAKDOWN I PBTD I Is" LNR-TIEBACK,18#,13-CR-80, .0177 bpf, ID = 4.276" I 17" LNR, 29#, N-80, .0371 bpf, ID = 6.182" I TD I 9665' 9527' 9549' 9648' DA TE REV BY COMMENTS DA TE RBI BY 08/11/76 ORIGINAL COMPLETION 10/22/91 LAST WORKOVER 04/07/01 RN/CHlK CORRECTIONS 09/28/02 BIINTP WAIVER SAFElY NOTE 02/07/03 JMP/KK WAIVER DA TE CORRECTION 09/27/0S EZLlTLH WAVIER SFTY NOTE DELETED GAS LIFT MANDRELS ST MD TVD DBI TYÆ VLV LATCH PORT DATE -1S-1/2" HES X NIP I -7950 "'9-S/8"XS-1/2"BAKERS-3A<R I ~ "'S-1/2" HES X NIP I HS-1/2" HESXN NIP I -1S-1/2" TUBING TAIL WLEG COMMENTS PRUDHOE BA Y UNIT WELL: 09-06 PERMIT No: "1760480 API No: SO-029-20216-00 SEC 1, T10N, R1SE, 3926.34' FE!.. & 3542.4S' FNL BP Exploration (Alaska) . TREE = ~ELLHEJ,I.D = ACTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = MCEVOY FMC BAKER C 54' o 3401' 30 @ 4200' 9347' 8800' SS fa 09-06 . 17" TBG, 26#, L-80/13-CR-80, .0383 bpf, 10 = 6.276" I TOP OF 5-1/2" TBG I 113-3/8" CSG, 72#, MN-80, BUlT, 10 = 12.347" I Minimum ID = 3.725" @ 8132' 4-1/2" OTIS XN NIPPLE 5-1/2" TBG, 17#, L-80/13-CR-80, .0232 bpf, ID = 4.892" TOPOF 4-1/2" TBG I 4-1/2" TBG,12.6#, L-80/13-CR-80, .0152 bpf, ID = 3.958" 9-5/8" CSG, 47#, MN-80/S00-95, .0732 bpf, ID = 8.681" I TOP OF 5" LNR- TIEBA CK I TOP OF 7" LNR I 8149' ÆRFORA TION SUMMARY REF LOG: BHCS ON 08/03/76 ANGLEATTOPÆRF: 11 @ 9207' Note: Refer to Production DB for historical perf data SIZE SPF II'ITERV AL Opn/Sqz DA TE SEE PAGE 2 FOR ÆRF BREAKDOWN I PBTO I 15" LNR- TIEBACK,18#,13-CR-80, .0177 bpf, ID = 4.276" I 17" LNR, 29#, N-80, .0371 bpf,ID=6.182" I TD I 9665' 9527' 9549' 9648' DA TE REV BY COMMENTS DA TE REV BY 08/11/76 ORIGINAL COM PLETJON 10/22/91 LAST WORKOVER 04/07/01 RN/CI-VK CORRECTIONS 09/28/02 BI'WTP WArvER SAFETY NOTE 02/07/03 JMP/KK WArvER DATE CORRECTION 09/27/05 EZL/TLH WAVIER sm NOTE DELETED COMMENTS I SAFaOTES: ***CHROMETBG & LNR*** 2159' - 7" OTIS RQ SSSV NIP, ID = 5.937" I 2528' - 7" X 5-1/2" XO I GAS LIFT MANDRELS ST MD TVD DEV TYÆ VLV 1 3012 3011 5 FMHO 2 4422 4344 25 FMHO 3 5226 5067 28 FMHO 4 5731 5515 27 FMHO 5 6147 5886 27 FMHO 6 6609 6300 26 FMHO 7 7068 6714 25 FMHO 8 7487 7094 24 FMHO 9 7820 7400 23 FMHO 10 7893 7467 22 FMHO 7998' 8006' 8007' 8132' 8145' 8132' LATCH PORT DA TE RK RK RK RK RK RK RK RK RK RK -15-1/2" X 4-1/2" XO I - 4-1/2" SEAL ASSY I - 9-5/8" X 4-112" OTIS HB SET PKR I -14-1/2" OTIS XN NIP, ID=3.725 - 4-1/2" TUBING TAIL WLEG I I- ELMDTILOGGED10/18/91 I PRUDHOE BA Y UNrT WELL: 09-06 ÆRMrT No: r.¡ 760480 API No: 50-029-20216-00 SEC 1, T10N, R15E, 3926.34' FEL & 3542.45' FNL BP Exploration (Alaska) TREÈ= · MCEVOY IiB..LHEAD = FMC ACruATOR~BAKER C KB. B..EV = 54' ~,~.~".,,~=. SF. B..EV = 0 KOP= 3401' Max Angle = 30 @ 4200' Datum MD = 9347' Datum TVD = 8800' SS e ÆRFORA TION SUMMARY REF LOG: SHCS ON 08/03/76 ANGLEATTOPÆRF: 11 @ 9207' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 3-3/8" 1/2 9207 - 9214 0 10/27/91 3-3/8" 4 9216 - 9236 0 11/30/91 3-3/8" 1/2 9220 - 9283 0 10/27/91 3-3/8" 1/2 9223 - 9263 0 10/28/91 3-3/8" 4 9236 - 9283 0 10/27/91 3-3/8" 1/2 9243 - 9263 0 10/28/91 3-3/8" 1/2 9288 - 9310 0 11/09/91 4 9310-9320 S 10/16/91 4 9331 - 9346 S 10/16/91 3-3/8" 4 9354 - 9357 0 11/30/91 3-3/8" 4 9357 - 9367 0 11/29/91 4 9365 - 9371 S 10/16/91 3-3/8" 4 9377 - 9386 0 11/29/91 4 9389 - 9397 S 10/16/91 3-3/8" 4 9428 - 9450 0 10/27/91 4 9450 - 9455 S 10/16/91 3-3/8" 8 9475 - 9494 0 10/27/91 3-3/8" 8 9494 - 9514 0 10/27/91 DATE 08/11/76 10/22/91 04/07/01 09/28/02 02/07/03 09/27/05 REV BY COMMENTS ORIGINAL COMPLETION LAST WORKOV ER RN/CHlKK CORRECTIONS BIINTP WAIVER SAFETY NOTE JMP/KK WA IV ER DA TE CORRECTION EZL/TLH WAVIER SFTY NOTE DB..ET DATE REV BY 09-06 PERFS . COMMENTS e PRUDHOE BA Y UNrr WB..L: 09-06 ÆRMrr No: 1'1760480 API No: 50-029-20216-00 SEC 1, T10N, R15E, 3926.34' FEL & 3542.45' FNL BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth 09/30/03 NO. 2981 Company: State of Alaska Alaska Oil & Gas Cons Comm At'tn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Prints CD P2-60. iq["(~ '~ PROD PROFILE WIDEFT 09113/03 NE-29~[[ ~- [ ~ ~ PROD PROFILE W/DEFT 09/09/0~ D.S. 3-29 '~ ~O~q PROD PROFILE W/DEFT 09/19/03 D.S. 15-18 ~ ~O('~ SBHP SURVEY 09/19103 U-08A I ~- ~~ SBHP SURVEY 09120/03 W-24., ! ~ ~~ / LDL 09/23103 D.S. 9-06 t ~ I~ ~ PROD PROFILE W/DEFT 09/20/03 DS 2-08B ' - '- ... . )q~ ~~ 23375 CH EDITMCNL 05/31/03 ~-23A ~ ..... -- 23373 OH EDIT LWD IMPULSE DATA 04130/03 'W-23A~~~~ 23373 MD VISION RESISTIVI~ 04/30103 W-2~A ~ -- 2~ ~ V~S~O..~S~ST~W~ 0.~0~0~ ~-23A ~ '23373 MD BOREHOLE PROFILE 04130103 MPS-0~ ~,_1~ 10624537 CH EDIT SCMT GR (PDC) 08/09/03 MPS-02~~ ~- ~ 23435 SCMT 08/09103 MPS-~8~~~~ 10559235 CH EDIT SCMT GR (PDC) 03/03103 10559235 SCMT 03~03~03 MPS-18~ ~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ,~,'~, Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A-I-I'N: Beth STATE OF ALASKA ~,,.,-,,,.SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate__ Plugging _ Perforate _ Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_X 54' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic_ Anchorage~ AK 99510-0360 Service_ Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 639' FNL, 797' FWL, Sec 2, T10N, R15E, UM. 9-06 At top of productive interval: 9. Permit number/approval number: 1704' FSL, 1287' FWL, Sec 1, T10N, R15E, UM, '-'78'.48.. ~ At effective depth: 10. APl number: 1718' FSL, 1347' FWL, Sec 1, T10N, R15E, UM. 50-029-20216 At total depth: 11. Field/Pool: 1723' FSL, 1359' FWL, Sec 1, T1ON, R15E, UM. Prudhoe Bay Oil Pool 12. Present well condition summaryd Total Depth: measured 9655 feet Plugs (measured) Fill Cleanout to 9545' MD (3/14/98). true vertical 9158 feet Effective Depth: measured 9545 feet Junk (measured) true vertical 9053 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 78' 20" 295 Sx 78' 78' Surface 2715' 13-3/8" 500 Sx AS 2715' 2715' Production 8814' 9-5/8" 1000 Sx Class G & 8814' 8333' 300 Sx AS Liner 1150' 7" 230 Sx Class G 9648' 9154' Liner 1415' 5" 200 Sx Class G 9560' 9066' Perforation Depth measured (9207 - 9214'; 9220- 9283'; 9288 - 9310'; 9358- 9371'; 9381 - 9390'; 9428- 9450'; 9475- 9514') * All perf intervals listed have been previously Gel squeezed. true vertical (8721 - 8728'; 8734- 8795'; 8800 - 8822'; 8869 - 8882'; 8892- 8901'; 8938- 8960'; 8984- 9023') * All perf intervals listed have been previously Gel squeezed. Tubing (size, grade, and measured depth) 7", 26#, L-80/CR-80, Tbg @ 2528' MD; 5-1/2", 17#, L-80/CR-80, Tbg @ 7998' MD 4-1/2", 12.6#, L-80/CR-80, Tbg @ 8145' MD. Packers and SSSV (type and measured depth) Otis HB Set Packer @ 8007' MD; Otis RQ SSSV @ 2159' MD. RECEIVED 13. Stimulation or cement squeeze summary Intervals treated (measured) see attached d U L Intervals treated (measured) AJ~.~I2~I ~i! ~', ~ ~clrlR. ~OITilTlJ$SJ 14. Representitive Daily Average Production or Infection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 788 3993 11997 293 Subsequent to operation 780 2575 10752 269 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _X Gas _ Suspended _ Service _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '"'~.,,~. ~ . ~ Title: Engineering Supervisor Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 9-06 DESCRIPTION OF WORK COMPLETED MARCIT ! MARASEAL GEL RESQUEEZE FOR WATER SHUTOFF & CALNOX GEL BREAKER TREATMENT 1/27/98: RIH & tagged PBTD at 9490' MD. 2/7/98: MIRU & PT equipment. Loaded the wellbore w/Crude, then RIH w/CT to bottom & pumped gelled sand slurry containing a total of 5500 lbs of sand to place an isolation sand plug across the perforation intervals located at: 9288- 9310' MD (Z2) 9358- 9371' MD (Z2) 9381 - 9390' MD (Z2) 9428- 9450' MD (Z2) 9475- 9514' MD (Z1) Ref. Log: BHCS 8/3/76. * All these perf intervals were squeezed w/Marcit Gel on 9/29/97 (see previously submitted Report Sundry). Tagged final TOS at 9305' MD. POOH w/CT. RD. 2/11/98: Performed a Fullbore Marcit & Maraseal Gel Resqueeze for Water Shutoff as follows: MIRU & PT equipment. Pumped the Gel treatment through the leaking perforation intervals located above the sand plug at: 9207 - 9214' MD (Z3) Ref. Log: BHCS 9220- 9283' MD (Z3/2) 9288 - 9310' MD (Z2: partly isolated by sand) 8/3/76. Pumped: a) 200 bbls 1% KCI Water cool down stage @ 5.9 bpm, followed by b) 500 bbls 1% KCI Water w/5000 ppm polymer @ 5.9 bpm, followed by c) 2000 bbls 1% KCI Water w/8000 ppm polymer & chrome acetate @ 3 - 5.9 bpm, followed by d) 1495 bbls 1% KCI Water w/10000 ppm polymer & chrome acetate @ 1.5 - 2.5 bpm, followed by e) 200 bbls Maraseal Gel @ 3 - 5 bpm, followed by f) 10 bbls 1% KCI Water spacer @ 5 bpm, followed by g) 260 bbls Crude Flush @ 5 - 6 bpm, followed by h) 20 bbls Diesel, followed by i) Shutdown. Attained 1400 psi final squeeze pressure. RD. 3/14/98: RIH w/CT & jetted a sand & gel fill cleanout to 9545' MD to uncover the lower perf intervals (listed above). 6/28/98: A Calnox Gel Breaker Treatment was performed as follows: MIRU CTU & PT equipment to 4000 psi. RIH w/CT mounted Inflatable Packer & set in the 5" tieback liner at 9263' MD (center element). Opened circulating sub & pumped Calnox treatment to treat the perforations located above the packer (listed above). Pumped 6 bbls of Calnox Gel Breaker & let soak for 30 minutes across the perfs, then pumped 2 more bbls Calnox & let soak another 30 minutes, followed by 102 bbls Calnox at 2.5 bpm, followed by 95 bbls Crude. POOH w/packer. RD. Returned the well to production w/gas lift & obtained a valid well test. Post-Calnox well tests indicate Oil rate still gradually increasing and Water Cut & GOR gradually decreasing. ~--STATE OF ALASKA - ,, .$KAOILAND GAS CONSERVATION COMMISL REPORT O'F SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown_ Stimulate__ Plugging _ Perforate _ Pull tubing Alter casing _ Repair well _ Other _X 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development_X 54' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic_ AnchorageI AK 99510-0360 Service_ Prudhoe Bay' Unit 4. Location of well at surface: 8. Well number: 639' FNL, 797' FWL, Sec 2, TION, R15E, UM. 9-06 Permit number/approval u er: ~ At top of productive interval: 9. 1704' FSL, 1287' FWL, Sec 1, T10N, R15E, UM. ~ At effective depth: 10. APl number: 1718' FSL, 1347' FWL, Sec 1, T10N, R15E, UM. 50-029-20216 At total depth: 11. Field/Pool: 1723' FSL, 1359' FWL, Sec 1, T10N, R15E, UM. Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 9655 feet Plugs (measured) PBTD Tagged @ 9512' MD (9/10/97). true vertical 9158 feet Effective Depth: measured 9512 feet Junk (measured) true vedical 9021 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 78' 20" 295 Sx 78' 78' Surface 2715' 13-3/8" 500 Sx AS 2715' 2715' Production 8814' 9-5/8" 1000 Sx Class G & 8814' 8333' 300 Sx AS Liner 1150' 7" 230 Sx Class G 9648' 9154' Liner 1415' 5" 200 Sx Class G 9560' 9066' Perforation Depth measured 9207 - 9214'; 9220 - 9283'; 9288 - 9310'; 9358 - 9371 ;; 9381 - 9390'; 9428 - 9450'; 9475 - 9514' true vertical 8721 - 8728'; 8734- 8795'; 8800- 8822'; 8869- 8882'; 8892- 8901'; 8938- 8960'; 8984 - 9023' ii "-, Tubing (size, grade, and measured depth) 7,26#, L-80/CR-80, Tbg @ 2528' MD; 5-1/2", 17#, L-80/CR-80, Tbg @ 7998' MD; ':" 4-1/2", 12.6#, L-80/CR-80, Tbg @ 8145' MD. ,. Packers and SSSV (type and measured depth) Otis HB Set Packer @ 8007' MD; Otis RQ SSSV @ 2159' MD. '"i.i.:.U. ~:::./.::,::', . ?~.~. 13. Stimulation or cement squeeze summary .... :,7,~,-: Intervals treated (measured)see attached ORIGINAL Intervals treated (measured) 14. Representitive Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 626 4433 15966 269 Subsequent to operation 575 3862 10971 260 !15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _X Gas _ Suspended _ Service _ 17. I hereby cedify that the foregoing is true and correct to the best of my knowledge. 'Signed '~~ ~ - ~ Title: Engineering Supervisor Date ¢/~- 2. g'-'~ 7 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 9-06 DESCRIPTION OF WORK COMPLETED MARCIT GEL SQUEEZE FOR WATER SHUTOFF 9110197: RIH & tagged PBTD at 9512' MD. 9129/97: Performed a fullbore MARCIT Gel Squeeze for Water Shutoff as follows: MIRU & PT equipment. Pumped the treatment through the open perforation intervals located at: 9207- 9214' MD (Z3) 9220- 9283' MD (Z3/2) 9288 - 9310' MD (Z2) 9358 - 9371' MD (Z2) 9381 - 9390' MD (Z2) 9428- 9450' MD (Z2) 9475- 9514' MD (Z1) Ref. Log: BHCS 8/3/76. Pumped: a) 400 bbls warm 1% KCI Water @ 4 bpm, followed by b) 100 bbts warm 1% KC! Water wi1000 ppm polymer @ 4 bpm, followed by c) 1000 bbls warm 1% KCI Water wi3000 ppm polymer & chrome acetate @ 4 bpm, followed by d) 2532 bbts warm 1% KCl Water w/4500 ppm polymer & chrome acetate @ 4 bpm, followed by e) 508 bbls warm 1% KCl Water wi6000 ppm polymer & chrome acetate @ 4 bpm, followed by f) 207 bbls warm 1% KCI Water wt8000 ppm polymer & chrome acetate @ 4 bpm, followed by g) 50 bbls warm 1% KCl Water wi2000 ppm polymer @ 4 bpm, followed by h) 185 bbls Crude Flush @ 4 bpm, followed by i) 10 bbls Diesel, followed by j) Shutdown. Attained 1380 psi final squeeze pressure. Rigged down. Shut In well for 10 days, then placed well on production w/gas lift & obtained a valid well test. ARCO Alaska, Inc. Date: Subject: From/Location: Telephone: To/Location: August 3, 1994 ARCO Cased Hole Finals Karla Zuspan/ATO- 1529 (907) 265-6547 Distribution P.O. Box 100360, A ,,;horage, AK Transmittal #: 94069 Weii' 'Log ~"i ......... T°°l T~'pe RUn "' Contractor Number (M-D-Y)t 16-,24 7-1,,1,:9,,4, ! ....... Pr0d, .Pr.0f. .......... I , SCH 14-07 7-12-9..,4 ............... Leak ,.,D..e.t .... 1 SCH ~ 12-32 7-10-94 Perf Record 1 SCH · · 09-43 7-12-94 Pef Record 1 SCH 09-06 7-11-94 Leak Det 1 SCH 07-03 7-10-94 Dual Burst TDT-P 1 SCH '0~-18 ~'-9-94 per[ Record I · SCH Number of Records: 7 Karla Zuspan Distribution: Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska Mobil Please ackn/~ledge r ec/e/~,~ y sig~g a cof~.<~f/~transmittal. ARCO Alaska, Inc. Is a Subsidiary of Atlanth:RlchfleldCompany ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 12-2-93 REFERENCE: ARCO CASED HOLE FINALS _1-3 1-4 1-16 ~1-22 -26 ~~-23A ~9-7 1-12  1-16ST 12-16A 10-31-93 11-5-93 11-5-93 11-7-93 10-14-93 10-31-93 11-6-93 10-31-93 10-31-93 10-17-93 11-9-93 11-2-93 11-4-93 11-8-93 10-18-93 11-2-93 11-4-93 11-1-93 10-20-93 10-25-93 11 - 1-93 11 - 1-93 11-9-93 11-9-93 11-8-93 10-26-93 11-8-93 11-8-93 11-2-93 ~~14-2 11-7-93 ~~14-4 11-6-93 ~il-';gA 11-10-93 10-19-93 and return the attached copy as RECEIVED B y__~~~____~~ Have A Nice Day! Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON # BPX # STATE OF ALASKA Perf Record [O~{ % -ilO0~, Run 1, ~' Sch Perf Record ~-q%'~Y-~ Run 1, 5" Sch Prod Profile ~Sf~0~-m~f~zt~[ae~Run 1, I~' .o-io~5o Sch Prod Profile/<~o~}~-me}e~%]~Run 1, ~' }~O-[/)gto Sch D~ B~t T~P ]~0--1/60~ R~ 1, ~' Sch ~od ~offie~t~}Tu~/[e~~R~ 1, E' 107oo -1 ~ ~o Sch Peri Record fi9 ~ O -I O~Z~ R~ 1, ~' Sch Pe~ Record 5~0-5SI~ R~ 1, ~' Sch Completion Record ~0~z~ R~ 1. E' Sch USIT (C~r0~ime64~m~ Color R~ 1, E' 5100.¢t0fa0 Sch Pe~ Record ~5~ --~Z~ R~ 1, E' Sch TBG Patch Record R~ 1, ~' 'TED0-7;%~ Sch Collar (Packer Set) . R~ 1. ~' ~dET~t0q%'~ Atlas D~ B~st TDTP t;~0~[~0oO R~ 1. E' Sch Peff Record ~O0~q~0 R~ 1, E' Sch Pe~ Record l~~{~-~ R~ 1, E' Sch IBP Set ~00~o R~ 1. E' Sch I,e~ Detect t%OiO}~¢~ R,~ 1. 1" 0- ~ Sch Pe~ Record '~ e~ ~~0 R~ 1. ~' Sch Pe~ Record ~ [~ ~0 ~ ~ R~ 2, ~' Sch ~ Detect I~0~[~0 R~ 1. l"&5" Sch Pe~ Record ~~ R~ 1. ~' Sch ~ Detect [~f/¢&~¢~ ~ 1. ~'~" ~-- 5¢o Sch ~od ~o~e j~ ~¢)¢~~~ 1. 1"~" o-t~o~ Sch TBG ~cher 2~¢-~95o R~ 1, ~' Sch Pe~ Record ~80~o~?~ R~ 1. ~' Sch D ~ B ~, t~~~T~5 ~ ~ R~ 1. ~' S c h receipt of data. APPROVED ~.,~_./' 4/~/... '-fi"¢ , _ FD Trans# 0314g-; -- "r~Oi/¢ ,, O # ANO8 GEOLOGY r~7~ '.,'0t~i..,.. # EXXON "°'S/O/s, # MOBIL The correct APl# for 3-20A is 50-029-20980-01. This log was ran on 4-11 not the sidetrack and the correct APl# is 50-029-20286-00, The correct API# for 9-7 is 50-029-20223-00. This log was ran on 12-16A and the correct API# is 50-029-20899-01. he correct API# for 18-29A is 50-029-22316-01. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-1-92 REFERENCE: ARCO CASED HOLE FINALS 1-4 ?~ ~'l 3-10 ~?-~°~ 3-17 ~--t z3 3-22 ~/~ 3-24 9-4 ~i-¢° 9-6 11-4 ~0~_~ 11-12 ~ t--r~-~ 11-24 3z-/ ?/ 12-20 3-24-92 Prod Profile R,~_n 1, 5" Camco 3-19-92 Prod Profile R~n 1, 5" Camco 3-20-92 Inj Profile - Run 1, 5" Camco 3-21-92 Inj Profile R,~n 1, 5" Camco 3-20-92 Prod Profile Run 1, 5" Camco 3-22-92 Prod Profile R~n 1, 5" Camco 3-23-92 Prod Profile R,!n 1, 5" Camco 3-23-92 GR/Jewelry R,~n 1, 5" Camco 3-23-92 Prod Profile Run 1, 5" Camco 3-20-92 Prod Profile R~n 1, 5" Camco 3-20-92 Prod Profile Run 1, 5" Camco 3-30-92 Prod Profile Run 1, 5" Camco 3-22-92 Prod Profile Run 1, 5" Camco 3-23-92 Prod Profile R~_~n 1, 5" Camco 3-23-92 Inj Profile Run 1, 5" Camco PITS Run 1, 5" Camco 18-16~-?/ 3-24-92 Please sign ~nd return ~_e _a_tta~ch~Ty as receipt of data. RECEIVED BY_ __~a~______~ Have A Nice Day, R E C E IV Sonya Wallace APPROVED ATO-1529 MI¥ ~ 1~2 Trans# O200~7xr ....... AJaska Oil & Gas Cons. Commissioll Anchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # PI-HI.LIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO # MOBIL STATE OF ALASKA .~,/, ALAS. hA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATI 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing X Alter casing X Repair well Perforate Other X WORKOVER 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 639' FNL, 797' FWL, Section 2, TION, R15E, UM At top of productive interval At effective depth 1717' FNL, 1337' FEL, Section 1, TION, R15E, UM At total depth 1723'FNL, 1359'FEL, Section 1, TION, R15E, UM 12. Present well condition summary Total depth: measured true vertical 5. Type of Well: Development X Exploratory Stratigraphic Service 9655 feet Plugs (measured) 9158 feet 6. Datum elevation (DF or KB) RKB = 54 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 9-06 9. Permit number/approval number 76-48 / N/A (Cons Order #258) 10. APl number 50 - 029-20216 11. Field/Pool Prudhoe Bay Field/Oil Pool Effective depth: measured true vertical 9535 feet Junk (measured) 9042 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 78' 20" 295 sx 78' 2715' 13-3/8" 500 sx AS 2715' 8814' 9-5/8" 1000 sx CIG & 300 sx AS 8814' 1150' 7" 230 sx Cl G 8498'-9648' 1415' 5" 200 sx CIG 8145'-9560' measured Squeezed off True vertical depth 2715' 8333' 8042~9154' 7703~9066' true vertical Squeezed off Tubing (size, grade, and measured depth) 7"26# 13 Cr-80 @ 2528'& 5-1/2" 17# 13 er-80 @ 8145' Packers and SSSV (type and measured depth) Otis "HB"Packer @ 8007'; 7" Otis SSSV @ 2159' RECEIVED 13. Stimulation or cement squeeze summary See Attached Activity Summary Intervals treated (measured) Treatment description including volumes used and final pressure FEB 18 1992 ~asJ~ .0il & Gas Cons, C0mmissi0r Anchorage 14. Prior to well operation Subsequent to operation Re.oresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sicjned ~ ~ ~ Title WorkoverSuperintendent Form 10-404 Rev 06/15/88 Date /%/~/~_ SUBMIT IN DUPLICATE ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY DS 9-6 AUDI 4 KILL: 5.5 NDNU: 4.0 10/11/91 ( 1) CIRC. MW: 8.5 Seawater TD: 9655 RIG ACCEPTED @ 20:30 HRS, 10/10/91. R/U LINES. TEST SAME. PB: 9556 R/U LUB. BLED OFF GAS. PUMP SEAWATER. CIRC. SUPV:GDM DAILY:S43,768 CUM:$43,768 ETD:S43,768 EFC:$1,173,000 NDNU: 10.5 PTBG: 10.5 PPBR: 3.0 10/12/91 ( 2) M/U BHA #1. MW: 8.5 Seawater TD: 9655 N/D TREE. TEST PACKOFF. NO TEST. N/U BOPE. ATTEMPT TO PB: 9556 TEST BOPE. NO GO. L/D 7" TBG & SSSV. TEST BOPE. POOH & SUPV:GDM L/D 5-1/2" TBG. TEST BOPE. M/U BHA #1. DAILY:S32,972 CUM:$76,740 ETD:S76,740 EFC:$1,173,000 NDNU: 6.0 PPBR: 12.5 PPKR: 5.5 10/13/91 ( 3) MILL ON PKR. MW: 8.5 Seawater TD: 9655 RIH W/ SPEAR TO 8000'. RIH W/ STORM PKR. N/D BOPE. CHANGE PB: 9556 PACKOFF. N/U BOPE. TEST BOPE. POOH W/ STORM PKR. RIH. SUPV:GDM ENGAGE PBR @ 8438'. POOH. L/D SPEAR, PBR. RIH W/ PRT. MILL ON PKR @ 8439' DAILY:S53,445 CUM:$130,185 ETD:S130,185 EFC:$1,173,000 PPKR: 10.5 COUT: 8.5 PROB: 5.0 PROB CODE: LC 10/14/91 ( 4) POOH. MW: 8.5 Seawater TD: 9655 MILL ON PKR F/ 8448'-8452'. LOST RETURNS. PUMP 200 BBLS PB: 9556 XCD TO BTM. POOH W/ PKR. L/D PKR. RIH W/ CSG SCRAPER TO SUPV:GDM TOL. ROTATE DN TO TOL @ 8498'. POOH. DAILY:S30,543 CUM:$160,728 ETD:S160,728 EFC:$1,173,000 SQZ : 5.0 COUT: 11.0 LPRF: 8.0 10/15/91 ( 5) RIH W/ PKR. MW: 8.5 Seawater TD: 9655 POOH. R/U ATLAS. RIH W/ GR/JB TO 8498' POOH. RIH W/ PB: 9556 VERTILOG TO 8476'. MAKE TWO LOG RUNS. R~D ATLAS. RIH W/ SUPV:GDM BIT. POOH. RIH W/ PKR. DAILY:S228,686 CUM:$389,414 ETD:S389,414 EFC:$1,173,000 SQZ : 24.0 10/16/91 ( 6) TD: 9655 PB: 9556 SUPV:SW REV CIRC SEAWATER. MW: 8.5 Seawater SET PKR @ 8400'. TEST ANNULUS. RELEASE PKR. RESET PKR @ 7600' R/U DOWELL. PUMP 10 BBLS WATER, 100 BBLS (488 SX) 'G' C~T W/ .05 GPS D47, .2% D65, .12% D800, .5% XE67749, 20 PPB PERFECT SEAL, 10 BBLS WATER, 115 BBLS SEAWATER. R/D DOWELL. SQZ CMT W/ 720 PSI. RELEASE PKR. POOH. RIH TO 8490' TAG CMT @ 9073'. DRLG CMT F/ 9073'-9238' CIRC. DRLG CMT F/ 9238'-9550'. TAG FILL. REV CIRC W/ SEAWATER. DAILY:S70,548 CUM:$459,962 ETD:S459,962 EFC:$1,173,000 RECEJ¥£D Alaska Oil & Gas Cons. Co Anchorage ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY DS 9-6 AUDI 4 SQZ : 7.5 RCSG: 16.5 10/17/91 ( 7) WOC. MW: 8.5 Seawater TD: 9655 REV CIRC SEAWATER. TEST SQZ. POOH. R/U WEATHERFORD. RIH PB: 9556 W/ 5" 13 CR LNR ON DP TO 9550'. CIRC. PUMP 5 BBLS WATER, SUPV:SW 200 SX 'G' CMT W/ .05 GPS D47, .2% D65, .27% D800, .5% XE67749, 20 PPB PERFECT SEAL @ 16.1 PPG (40 BBLS). PRESSURED UP TO 3000 PSI ON PLUG, BLED OFF. PRESSURED BACK UP TO 1500 PSI. SET LNR HGR. RELEASE F/ HGR. REV CIRC. POOH. M/U CSG SCRAPER. DAILY:S55,238 CUM:$515,200 ETD:S515,200 EFC:$1,173,000 RCSG: 24.0 10/18/91 (8) TD: 9655 PB: 9556 SUPV:SW POOH. MW: 8.5 Seawater RIH W/ BHA #7. TAG TOL @ 8137'. CIRC. POOH. RIH. TAG CMT @ 9281' DRLG CMT TO 9383'. POOH. DAILY:S78,468 CUM:$593,668 ETD:S593,668 EFC:$1,173,000 COUT: 10.5 RCSG: 13.5 10/19/91 ( 9) R/U W/L . MW: 8.5 Seawater TD: 9655 POOH W/ MILL. RIH TO 9383'. DRLG CMT TO 9535'. CIRC. PB: 9556 POOH 2 STDS. TEST CSG. REV CIRC. POOH. R/U ATLAS. SUPV:SW DAILY:S24,678 CUM:$618,346 ETD:S618,346 EFC:$1,173,000 COUT: 3.0 RCMP: 21.0 10/20/91 (10) RIH W/ TBG. MW: 8.5 Seawater TD: 9655 RIH W/ GR/JB. R/D ATLAS. R/U WEATHERFORD. RIH W/ 7" X PB: 9556 5-1/2" 13 CR TBG W/ OTIS 'HB' PKR. SUPV:SW DAILY:S42,523 CUM:$660,869 ETD:S660,869 EFC:$1,173,000 NDNU: 10.5 RCMP: 7.0 10/21/91 (11) RIG RELEASED @ 23:30 HRS. MW: 8.5 Seawater TD: 9655 RIH W/ 7" X 5-1/2" TBG. LAND TBG HGR. SET PKR. TEST TBG, PB: 9556 ANNULUS. PUMP 150 BBLS DIESEL DN TBG. RELAND TBG. TEST SUPV:SW PACKOFF. N/D BOPE. N/U TREE. TEST TREE. SECURE WELL. RIG RELEASED @ 23:30 HRS, 10/20/91. DAILY:S367,756 CUM:$1,028,625 ETD:S1,028,625 EFC:$1,173,000 RECEIVED FEB 1 199 Alaska Oil & Gas Cons. Commiss%o~ Anchorage ARCO ALASKA, INC. P.O. BOX iOOS60 ANCHORAGE, ALASKA 995t ¢, DATE' i 2-'-5 ~ -91 ARCO CASED HOLE FINALS t t~8-9t¢'/.., .CCL FOR AVA PACKER & CIRC.,. 9-:.Z4-? i '"'/I:'ERF RECORD t,3-25-9t '"'"iCCiRRELATION (TUBING F:'AI"CH) t '~-"4-9i '"'~/PERF RECORD 9-7-9t E-RF RECORD ~¢,-29-9~ COLLAR LOCATOR 9--27--9 i ¢//F'E R.F RECOF,:D ¢'/,F'ERF RECORD . i 6,,-28-9t "/CORRELATION NEUTRON t t-;3-6,-9t V',FtERF RECORD , i i-".~':."-ot//~ORRELATION tTUf4ZNG PATCH) t t -273-9t -/ //PERF RECORD t2-5-9t ~CCL FOR STRESS FRAC t i-25-9i '" PERF RECORD . SIGN AND RETURN THE ATTACHED COPY RECEIVED BY HAVE A NIC'E DAY'! ZONYA W~':4 t_LF~C E ATO-i 529 HOLES F;,'UNt , ..,~'" RUN t, 5" RUN i , .--'~"&'~..,· F,'UN i, '5· RLJN i, 5 * [;:UN t, 5 · RUN i, 5" RUN i, 5' RUN i, .,.'":' RUN i, 5' RUN t , 5' F<UN i, 5' RUN ~, 5 · RUN i, 5' RUN t , 5· RUN t, 5' A~ RECEiF% OF DATR. FILS HLS FILS i--i t._ ;£ HI_S I--II_Z I--IL. £' HLZ H L.S-' I-ILS HLS 14LZ HLS HLS HLS HLS JAN 10 1992. DISTRIBUTION CENTRAL F£LE$ CHEVRON EXTENZION EXPLORATION EXXON MARAI'HON MOBIL Alaska Oil & Gas Cons. Gommission Anchorage · ~ -PHILLIPS PB WELL FILES R & D · f,: B P X S'I'ATE OF ALA,"JKA '1" E:. X R [; U ARCO ALA£KA, INC. 'F'.O, BOX iOOS60 ANCHORAGE, ALASKA 995t0 DATE: ii-22-9i RECEIVED NOV 2 b 1991 Alaska 011 & Gas Cons. Commission Anchorage REFERENCE' ARCO CASED HOLE FINALS F'ERF RECORD RUN i , 5' ~'CH CBT (COLOR) RUN t, 5' SCH ULTRASONIC IMAGER-USIT (COLOR) RUN ~, 5' $CH PFC RUN i, 5' ATLAS UNL-GR, L;CL RUN t 5' ATLA~ CNL-GR - RUN t, 5' SCH COLLAR-F'ERF RUN ~, 5' ATLAS COLLAR-F'ERF RUN i, 5' ATLAS COLLAR-F'ERF RUN i, 5' ATLAS ~.//I 9-33 ~ ~ ~-~ 8-9t COLLAR-F'ERF RUN t, 5' ATLAS _~.~ ~-4A~-~-t4-9~ F'ERF RECORD RUN ~, 5' SCH /~ S-~8 A ~3-24-~t DIT-E RUN ~2.~-~-98 ~0-24-~ CNL - EPITHERMAL RUN ~ ~ ~-~8 ~ ~ 8-24-~ CNL - THERMAL RUN ,:,.. - ....... ~' .: . ....... ~ .............................. F'i_E~SE S~GN ~ND RETURN THE ATTACHED'"' COPY A~' RECE~F'T OF D~I'A - --. ~ ~-.,~-~ ,~:--,.~-~ .'- .-..-:.,-~ ~: ~.-.--:.-. :~-~. :--~-~:..~,?..--: ~ ,-.~-?~-~?~ ~_..._ .. _ ~:~:~-~ ?~t?~:,.,,~_.._. ~-..' '-~. ~..' ~.--_,~,,~. ~."?.-'¥~' ~-~,?~::~'......... $ONY_A._~ALLACE- '- '~-'" ' ':" :';' :' : :' ~'::L:'"¢::''~:'':':-~-''''':-~;' '~PF'ROVED ~__~ .... RECEIVED I) I ~TR I BUT ]:. ON · .- _CEN'TRAL FILES ~" C H E V R 0 N D &iff :',l:EXTE'-N,.~ I ON E:XF'I_OF.'.A T I ON '"' EXXON HARA'THON '"'-,- H OB .'r_ L · ,.'"' PHII_LIF'$ · F'B WEL. L. FIL. ES R & i') -" BPX '~ 3TATE OF ALA~';KA TE,,~CO * TI-IE COF;.'.RECI" AF'If~ FOR i2--4A 13' 5(~-;..'",~29-'2(-)384-,'5i. NOV 2 b 1991 Alaska Oil & Gas Cons. Commission Anchorage ARCO ALASKA, P~,O. BOX i0 ANCHORAGE; ALAS'KA 99b, 0 DATE · ~ i -8-9 REFERENCE° ARCO CASED HOLE FINALS 0-28-9t COLLAR-PERF 0-22-9i 5R-CCL ('}-22-9 i CNL-GR ~3-23-9t COLLAR (PERF) ,S,-2]5-9t COLLAR (F'ACKER) 0-t 9-91 COLLAR <5 - i 4-' 9 i V E R T ]1 [.. {i) Il; 0-27-9i COLLAR 0-29-9t VERTILOG 0-29-91 VER'FZLOG N AND RE-'TURN THE ATTACHEI) COF'Y AS RECE-~IPT OF RUN i , 5" I;.'UN i., 2' R LJ i'J, i , :"_.. ' Ir<UN i , 5" RUN t, 5" RUN i, 5" R 1.. i'J ,t ~'<. RUN i, 5" RLIN t, 5" RtJN I , 5" DATA ATLAS A T I_ A Z' A T L.A :':,' A "1' L ~::~ .~, ATLAS' A '1' I.,A :~ A T 1... A al'l_Ag' ATLAS A'I'LA~ RECEIVED BY HAVE A NiCE DAY! $ONYA WALLACE AT0-t529 APF'ROVED ~ 'I-RANS¢ 91 DISTRIBUTION CENTRAL i"- ILE$ '1I' '"".- CHEVRON -- '-- D & M ~ EXTENSION EXF'LORATION ~ EXXON MARATHON ,~ MOBIL ~ PHILLIPS PB WELL FILES R & D ~ BPX · .-'"' STATE OF ALASKA TEXACO ...... ; Cy, :;. ~.-},S ARCO ALA2C-KA, Ii"~C~ P.O. BC) X i3,:'33S;3 A N C !--t O F,' A G E, A L_ A £1--'; A 9 ':.? .., i O D A T E: · i (.'; .... 2 ~- '7--;' i REFERENCE' ARCO CASED HOLE FINAL.~? F'ROD F'ROFILE GR/CCL 6R/C:CL_ PERK BRIEAKDOWN 6R/CCL LEAK DETECT F:' t:;.; O L: F'h'.L~I" i LEAK t.;,E TEC T PROD F'I:~¢OF' I LE ' -" .... i",! AND THE A TA COP ~ ...... FLE~,zE $IE.- RETUF;,'N T CHED i" A~.: F;,'ECE'rF"i'' i'lz 'nA'f'A, · RECEIVED BY ....... HA",/E A NIC,E )iA',". .. ^. . £' O N Y A W A L_f... A C E / CAMCO CAHf£L] t.., ~:-i f'] L.. I_.; F: A i'i C t"J C; A i"-i C 0 C A i'd C ........ I.; A f'"l L..' LJ C A i.i C C A M C 0 D I ~-;TR I B U T i i-)N CENTRAl._ i"- ! !_IS,? CHEVRON D &M EXTENSION EXPL. ORA'f'ION E X X 0 N HARATHON MOBIL ARCO ALASKA, INC. F', O, BOX ANCHORAGE, ALASKA ,''DATE' 9-6-9t REFERENCE' ARCO CASED HOLE FINALS i-9- 8-t 7-9i F'ROD F'ROFILE 2-5- 8-8.-9t TEMF'ERATURE 2-"26- 8-8-9t PROD PROF'ILE ~\ ~q] --'5-35- 8-S-9t GR-COLLAR 4-29~ 8-t ~-9i PITS ~--- 7-7A-- 8-9-9t PROD PROFZLE 7-i ~ 8-4-9i TEMPERATURE 7-2~ 8-i8-9i PROD F'ROFILE 7-28- 8-i -9i TEHF'ER~'FURE 7-29- 8-3-9t F'ERF BREAKDOWN/FIPFM/TEMP 9-6- 8-2-9i LEAK DETECT 9-? 8-t9-9i PITS 9-i7~ 8-4-9i INJ PROFILE it-2- 8-9-9i INJ F'ROFILE ii-~ 8-4-9i LEAK DETECT i t-24- 8-4-9i F'ITS/HF'FM t2-3~ 8-i4-9t LEAK DETECT t2-8B- 8 9 9i FROD F'ROFILE * iS-S- 8-it-9i PROD PROFILE iS-ii- 8-ii-9i PROD PROF'ILE !S-J2- 8-i5-9i PROD PROFIL. E t3-t4- 8-t6-9i F'ROD F'ROFILE i4-23- 8-i1-9t PROD PROFILE i5:-2~ 8-t4-9i F'ER.F BREAKDOWN ]'REATNENT i6-i- 8-i6-9t INJ PROFILE t8-3-- 8-i6-9i LEAK DETECT RUN t RUN t RUN t RUN t RUN t RUN i RUN i RUN i RUN t RUN t RUN i RUN t RUN i RUN t RUN i RUN t RUN i RUN t RUN i RUN i RUN i RUN i RUN i RUN i RUN i RUN t RUN i PLEASE SIGN AND RETURN THE ATTACHED RECEIVED BY W~_.~4~ ~~----._ HAVE A NICE DAY! SONYA WALLACE: ATO-i529 COPY AS RECEIF'F OF DATA AF'F'ROVEI) 'I'RANS~ 9 C A MC 0 ~' CAMCO , , 5 · CAMCO , 5' CAMCO , 5 · (;AMC[) , 5 ' CAMCO ~' C A ~iC 0 , 5' CAMCO 5 ' CAMCO , 5' CAMCO , 5" CAMCO , t'&5' CAMCO ~' CAMCO , 5' CAMCO , 5 ' CAMCO , 5 ' CAMCO , 5 ' CAMCO ~;' CAMCO , 5" CAMCO , 5' CAMCO , 5' CAMCO '.~' &5' CAMCO =:" CAMCO , 5 ' CAMCO , 5" CAMCO , 5 ' CAMCO ~' CAMCO DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLOR. AT ION EXXON MARATHON MOBIL PHILLIPS F'B WELl.. FILES R & D BPX STATE OF ALASKA TEXACO * THE C)':[R6-¢--<r_L;TED AF'I~ FOR t3-..-5 IS 5(~-(9°9-">¢'325~ ARCO ALASKA, INC. P.O. BOX t00368 ANCHORAGE, ALASKA DATE: 7-t2-9t .~REFERENCE: ARCO CASED HOLE FINALS t-t t 6-5-9t t-t t 6-5-9t t -2t 6-7-9t 2-4 6-30-9t 4-t 6-t t-9t 4-36 6-t 9-9t 4,-36 6-2i -9t /-4.-S7 6-2~ -9~ 6-2 ~1.~~ J4-37 t-9t -~ _ ~4-37 6-24-9~ 7-2-9t 7-t 5 6-~0-91 * 9-6 6-t 6-9t 9-8 6-5-9t 9-9 6-23-9t ** 9-t0 4-t 7-9t 9-~3 6-t 4-9t 0 -1~9-47 6-8-9 ** t t-3 4-t ~ ~-5 6-t 2-9t ~2-t2 6-t 6-9t t3-tD 6-t7-9t **** ~3-f6 6-t 7-9t t 6-t 6 6-t t7-~ 6-t 6-9~ t7-t ~ 5-8-9t PROD F'ROFILE-" GR-COLLAR J PROD PROFILE/ CCL-PERF/ GAS LIFT/ CBT/ CET~ PFC-GR (PACKER SETTING CBTj CET~ PFC-GR (PACKER SETTING) GR-CCL~ COLLAR-PERFJ PRODUCTION PACKER-- SBL/GR/CCL- CCL-PERF-- LEAK DETECTION~ PERFORATION BREAKDOWN/ COLLAR-PERF~ INJ PROFILE/ JEWELRY~ LEAK DETECTION-- INJ PROFILE~ DATA FRAC '¥EMP~- LEAK DETECTION--' PROD PROFILE---. PDK--~GG/GR/CCL-BORAX~ LEAK DETECTION~ INU PROFILE--' INU PROFILE~ INUECTION/F'RODUCTION-' PRISM-- LEAK DETECTION.~ RUN t, 5" CAMCO RUN t, 5" CAMCO RUN ~, 5" CAMCO RUN ~, 5" ATLAS RUN t, 5' CAMCO RUN t, 5' $CH RUN t, 5' $CH RUN t, 5" ATLA~ RUN t, 2'&5' $CH RUN t, 2"&5" $CH RUN t, 5" ATLA~ RUN t, 5" ATLAS RUN t, 5" Al'LAS RUN t, 5" ATLAS RUN ~, 5' ATLAY RUN t, 5' AI'LA£ RUN t, 2'&5" CAMCO RUN t, 5" CAMCO RUN t, 5' Al'LAS RUN ~, 5" CAMCO RUN t~ 5' CAMCO RUN t~ 2' CAMCO RUN ~, 5' CAMCO RUN t, 5" CAMCO RUN t, 5" CAMCO RUN t, 5" CAMCO RUN t, 5' ATLAS RUN t, 2"&5" CAMCO RUN t, 5" CAMCO RUN t, 5' CAMCO RUN t, 5' CAMCO RUN t, 5" ATLAS RUN t, 2'&5' CAMCO PLEASE SIGN AND RETURN THE ATTACHED COPY.AS RECEIPT OF HAVE A 'NICE DAY! $ONYA WALLACE ATO-t 529 DATA, DISTRIBUTION CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL BPX STATE OF ALASKA TEXACO * CORRECTED LOG INTERVAL FOR 9-6 I£ 6780-770~ ** REFERENCE MIX UF' ON TRANSMITTAL 9ti59 - POSSIBLE DUPLICATE LOGS *** CORRECTED LOGGED INTERVAL FOR 9-40 I$ t395t-t425i **** CORRECTED API$ FOR i3-t6 I$ 50-~29-20823 ARC'O AI_A~;'KA, tNC~ P,.O. BOX ~OO:560 ANCHORAC;E:, ALA,S'K A 995i .- DATE ' 6/2;3'/9'~ REF:EF;.:t:.~NCE' ARCO CA,Z-',ED I.-I[.)I_E." F'INAL£.' 'i- 2._5.. .. _.r-:--";8... . -,'..4,;:~,. F' C;' ri .O I, , ............. ICTI FiN PROIZ ILF ~IJRVEY' 171 Ii'-.! 'i , _...~':'" 9-2 6-3-90 TEHF'ERATUF.:E LOG RUN i , 5" '.:;'-4 6-3-96) TEi"iPEF.:ATURE:: LOG RUN i, 9-'.5 :_':,-":-o;:;,_, , ,, 'f'EMF'ERAT~..tRE 3:IJt;:VEY t;..'UNi .. ~'~" 9 .... 6 6 -.~".:;-- 9 0 T E H F'E F: A T U F;..' E 5' LJ,r';: V E Y R U N i , 5." 9 .... :? 6-4-'..-70 TEMPERATIJRti." I_0(;. I;.:tJN t , 9--~ i 6---.a-90 "I'EMPF'F;.:ATURE 1. r)r.;. Rt..li,.I t ~" 9.-i :q... 6-.a-o;:;, , .., TEMPEF;tATtJF;.:E ,":71 ....tl;:VEY RUN i , ':~'," ,-.4 .... .::,¢':~ 6 --- .'x - ,.-? ¢:, TEH!::'ERATUF;.:E Lrii.'.;. F;.:lji,.! i ':;" · ,~..... ........ ! ..,' 9-:::2.'-"-',. 6-4-90 TEMF'EF.:ATURE ;~Ui:;,'".."EY I;,'UN i, '.5" (:,.. .... .,-..":' .,."~' ,..,": _.. .,:::,. _ c;,, ,'-'~... T E M P E F;.'. A "f' U 1:;,: E:' L_ 0 [.;. F;..' I.I. j'..~ 'j., '.:.i~" 'i 2-4A 5-:5,:)-':;:',:-). LEAK DE]"IECTION. F,:UN i , ':~' iS---7 ':.'.".-:::'~(:)-9,:-) TE'HP/£'PINi'~ER G/L. ~.'tJRVEY RUN C ,q M f':: 0 C. A i'd E: 0 C A i"'i C C A M C 0 C A f'"i C: C A H C 0 C A H C O C A H C 0 C A i:.i C 0 C. A id C 0 C A HCO CAMCt) C Iq H C 0 I:'L. EA:'~E "D):GN AND RETURN THE AT'T'ACHED COF'Y AS I;.:F'CEIF"I- OF DATA. l::.'.,,': C:: ~-~. ,: '..-'-: r,: ,) ,,, -.,, ..... REC~ ~'E~ NIC:E DAY! JUN 2_ 2. 1990 ::.; A L.. L Y H 0 F' F'E c K E F:..' Alaska, Oil A Gas Cons. 6ommissio~ AT o- 'i ::;,-,o,= , . Anchorage AF'F'ROVED~ 'i'RAN3":~ o,'.'"~26, i.),:. DI;FTRIBUTION .I: CENTRAL FILE,~ ~'~ CHEVRON D & M "'- EXTENS'ION EXPLORATION · 11' · "" EYXON MAF;.'.A THOM .,~" MOBIL F'HILLIF'$ F'B WEL_L FILES' R & D ~- BPX &'TA'i'E OF ALA~';KA TEXAC:O ARCO ALA3"KA, i[NC,~ F'.. 0 .. BOX i (.) (.) 3; 6 r.::, ANCHC)RAGE, ALA3'K A 995i _PATE · '7- ~'8-8°..- , REFERENCE mR..,O F'REa~URE DATA S -- i 5: '7, - '".,, _ o,., o, B i--t F' - -,, ~' TA 7' I C C; R A D ,.]' E N 'TI--I L · .-J- 22 7--9-89 BHP--3'TATZ C GF;;AD l' ENT !-t1.. ~j 4-i 6-2::3-89 BHF'--~;']"A T ]: C GF;:AD ];ENT 4--26 7.-1 '2-U9 BI-IF--,.,. I mi .lC {;-RAf:,_~E?.-.!T CAr'~CO 7-.i 6 6-.3O-89 BHF'--$'TAf'IC GRADIENT kiL£' 9 -3 7 ..- 5- ::39 B 14 F'-- :~;' i" A 'r .[ c u. R A D i E N F t-~ I.. :~' ?-'7 '7-5:- 89 B H P-- S' TA 'i" I C 6 R A D i E N T H t._ ?.--? 7-.-6-89 BH P--,",2T R T ;[ C [~t;:A D '_l_' EN T HI_ 9-24 '7-7-!:::9 BHP--~'TRT IC (:,RAD 'f EN'i' I-IL,S' 9-:)8 7-6--89 BHF'--3' T,,'.:i T i C GRADIENT i i--2.5 7-t '-2-89 BHF'--:~"f'A'FIC GRAD ]. EN'I' CAtnCO i 6-f 7-5-89 Bt4P--,~:;"i"A'FIC GRAt)iEN'f' ML3.: i 6-6 7-8-89 BHP--2'TA'FIC GRADIENT I--tL~' t 6-8 7-8-89 BHk'--S"f'A'f'iC GF;~ADiEN [' i 6--i ''~ 7--9-89 BHP--3,"f'ATIC C;RRDIENT' HL~' ~_ i 6--':2".;, '7.-8-89 BHP--£'TATIC GRADIENT .~ -* -... ;,.. ..... . i8-24 7-8-89 ~I-tF--~fF~Ii'C GRADIENT HL£' PWDW2-i 7-9-89 BHP--£TA'f'IC GRADIENT CAMCO HAVE A NICE DAY! SALLY I-iOFFECKER ATO-~ 529 F'LEA3*E SIGN AND RETURN THE ATTACHED COPY AZ' RECEIPT OF DATA, DISTRIBUTION CENTRAL' FIEEg CHEVRON'... ' ....... D & M .. EXXON '~ HARATHON HOBIL F'I4.[ I_L I P 3' I::'B WELL F'ILE3' R & D BPX ;g'TA'I'E OF ~LA;~KA TEXACO ARCO AI_AS'I<A, INC, F:',O~ BOX t (')(')S6() ANCHOIRAGli'E~ AI_A,S°KA. 995t 0 DA1'E' 7-t'7-89 ~ I~,EI"E.I'~E.N..,E: ARCO CA,S'ED HOI_E F'INAL$' S-' t t 6'"'29-89 S- t 2 6- 29 "" 89 S- t 5: '? -' 7 - 89 3-'22 '?-9-89 5-' S 7 '" t '- 89 9-'2 7-5-89 9 --6 7 -5 - 89 9 -7 7 - ~ -89 9 - ? 7 -5 - 89 ?-28 '7-5-89 t t-2 '7-7-8~ I t-7 "~-9-8~ ~ t -t 6 7-t ~-8~ t 2-25 6-:3~-89 t 2-25 6--S~-89 J 6-20 7-8-89 RUN I , 5" I:::I. JN t, '5" RUN t , 5" I.<UN t, 5" RUN t , '.!~.:" RI. JNI ..5" RUi',II , '.~" R U N RUN t , 5" RUN t, '5" I:::UN RUN RLJN t , R U N RLJN 1'4:U N t, F'I..EA,.~'F ,?;IGN AND RE.:.I'URN THE A'¥TACHED COPY AS' RECEIF'T OF DA'I"A. RECEIVED BY HAVE A NICE i)AY~ .... . ~'ALLY I-.IOF:'FECK ER 1~.~,~ AI::'PROVED ATO-t D29 auu~.[.RAN~,~ 89 I) I S TR I BU'¥ I ON ""..- F' FI i L I.. I F' $ F'B WELL. F']:L. E6' R & D · ."BF'X ,11. · . ~%'T A T E OF ~~ TEXACO 01' I 0 "r ]: ,.~ CI '1' .t..¥ 0 0 '1" :1: ,':; L) '¥' .1: (3 'l' :1: ,S' 0 l" :1: t:} "f' ]: O'T' ]: O'i" l .~,' OTIS OTIS OT I,.~ O'F I S OTI,~ ARCO ALAZKA, ][NC~ P~O~ BOX ~0(-)S60 ANCFtOF.'.A(}E: ALA3'K A o,~,.'~.~,~_,i (:." DATE:' 6-i 4-89 REFERENCE' ARCO F'RE£2URE DATA 2 - i t 5 - 4 - 89 B H P-- 2 'T'A T ! C 6, R A D ]1E N 'f' C A ~1C 0 5-9 5-22-89 BHP--FLOWING (~RADiENT CAMCO · - .,. ., i , , BHF ....2'TAT]:C f;RADIEN'f' 4-5(;. 5- i 8-89 BHP--FLOW I N6 GRAD i EN'f' CAr4CO 4-32 2;-i 7-89 BI-.iF'--S'FATIC (;RADIEN'f' CAMCO 6-i 8 r5--'2':2-89 BI4P--~'TRTIC GRADIENT CAHCO , -- -..~..o d, BHF ....FLF~W l Nf; GRAD I EN'f' CAMCO 9-6 4-'29-89 B!4F'--FI..OW I N(; (;RADIENT CAMCO 9--7 4-SG-89 Bt-.tP--F'LOW I NG GRADIENT CAMCO 9-9 4-27-89 BlflP--FL. OW IN(; GRADIENT CAMCO t2-ti 5-2i-89 BI4F'--FLOWING GRADIENT CAHCO t4-2 4-t 9-89 BI4P--2TATIC GRADIENT CAMCO PI_EASE: SIGN AND R. ETURN THE ATTACHED (;OF'"( AS' RECEI'PT OF' DATA, ___,4 ....... f'/// ' ' / tUN 16 1989 (-'/ /'~' :_-;'ALLY HOF'FECI<~ " APF'r'~o'~ED '¢&_'~ A [' O- i 5 2 9~ / AlaS~ Oil & Gas Cons. Commission r R A N £' ~ 8 9 !Z ~ 3 Xk ~ ' -- Ntchorage DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTEN2ION EXPLORATION EXXON MARATHON MOBIL -,- PHIl_LIPS F'B WELL FILES ~- R & D ~: BF'X ¢,- ,S'.'I'AYE OF AI_A2KA -,.-'TEXACO ARCO ALASKA: INC~ F'.O~ BOX ~'3()36r3 ANCHORAGE ~ ALASKA 9 9 "3 'i (') D~] E · 5- i~°- 8""~,. R I:: F E R E N C E ' i-i9 ') '-') %' _. '~ ,..., '?--i 7-i4 9-S 9-6 9-'7 9 '-- '']) t' i i - i3-26 i 3--33 i 7-8 W G I PI_EASE SI[;. ARCO CASED HOLE FINAi_£ 5--i-89 F'RODUCTION F'ROI-'-'ILE RUN i , 5-4-89 COLLAR/F'ERP- RUN i, =,-.=,'- 8c~ CC)LLAR/F'ERF RIJN .... ..~. ~ . 4-1'3-8'~ F'RODUCTZON F'ROF'II_E RUN t , 5" 4-'56,-89 COLLAR/F'ERF RUN i , b. 4-28-89 F'RODUCTION PROFILE RUN i , 5" 4--':~e-.8~ F'RODt IC'F l ON PRriFILE RUN 4-3G-89 F'RODIJCTION F'ROFILE RUN i '~'" , 4--27-89 F'RODUCT!ON PROF]:LE RUN i , 5" 4--29-89 COLLAR/F'ERF RUN i , 5" 4--26-89 F'LOWMETER TEMP SURVEY RUN i, 5" 4-26-89 FLOWMETER 'rEeF' SURVEY RUN i , 5" 5-27-89 COLLAR/PERF RUN i , 5' ':;-':-8°.. ~ ,PFC RUN i , 5' N AND RETURN THE ATTACHED COPY AS RECEIF'T Ok DATA I-; A i"i ;; ATLAS A'¥ L..A£ C A M C ;."J A 'f' I.. A .~:: C A M C 0 C A r.i ,:.; ,..J C A i"., {3 ti C A f'~ I~ U C Art c: o CAHCO I.-tL.S ATI_A£' RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-i 529 APPROVED ~,..~ ;__ TRAN$.$ 89 ~-J9 DISTRIBUTION · ,-'"' CEN'rF,,'AL FILES · "-.,,. CI..tE:VRON D & M ~ EXTENSION EXPLORATION lr ~ EXXON MARATHON ~ MOBIL · ,-F' H ! L L I P $ F'B WELL F'ILES R & D ~~ BPX '"' 'STATE OF ALA$1<A ~ I'E:XACO · .,'~;,a 0il A Gas Cons. ,Anc~0r,~ge STATE OF ALASKA "~ 0 ~ i G iN A I. ALASKA OIL AND GAS CONSERVATION COMMISSION . MPLETION OR RECOMPLETION REPORT AND LOG ff'"l--I.. ~.~,.~llil--br-- · lYE1 VII II---vvmw-- .~m · ·,,~,.-- .-- Classification of Service Well 1. Status of Well OIL ~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-48 8. APl Number 3. Address P. 0. Box 100360~ Anchorage, AK 99510 50- 029-20216 4. Location of well at surface 9. Unit or Lease Name 639' FSL, 797' FEL, Sec.2, T10N, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1704' FSL, 1287' FWL, Sec.1, T10N, R15E, UM 9-6 At Total Depth 11. Field and Pool 1723' FSL, 1359' FWL, Sec.1, T10N, R15E~ UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 54' ADL 28327 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No. of Completions 07/02/76 08/05/76 08/11/76*I N/A feet MSL] 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth whereSSSV set 21. Thickness of Permafrost 9655' MD/9158' TVD 9565' MD/9069' TVD YES [~ NO[-]I 2185' feet MD lqnn' 22. Type Electric or Other Logs Run DIL/SP/BHC$/CR¢ CBL/VDL; CR/CCI_. FDC/£NI /C,,R/£AI C, vr'n \/~r~rilnn 23. ' CASING, LIN'ER~ANI~ CEMENTI~N'G RECORD ... SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ?(l" 9~.0# H-4n Surf 78' Be] P~ ~' 295 ~.x cmt I~-~/R" 79 n~ NN-RO Surf 2715' 17-1/2" 5500 sx Arct'~c Set emt q-R/R" /*7;~ MN-80/S00-95 Surf 88!~., !2_!/1~.,, ~nnn ~ ~=.- n ,. ~nn .. AS cmt 7" 79.O# N-R~ R/~qR' 96a~' 8-!/2" 230 sx Class C 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) Perforated w/0.5 spf SIZE DEPTH SET (MD) PACKER SET (MD) 9208 ' -9214 'MD/8717 ' -8726 'TVD 7"/5½"/4½" 8557 ' 8455 ' 9220 ' -9282 ' MD/8732 ' -8793 'TVD 9285 '-9320 'MD/8797 '-8832 'TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Perforated w/4 spf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9331 ' -9346 'MD/8842 ' -8857 'TVD N/A 9365 ' -9397 ' MD/8875 ' -8907 'TVD 9428 ' -9455 ' MD/8938 ' -8964 ' TVD 9489 '-9514 ' MD/8998 ' -9023 'TVD 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) July 1977I F1 owi no Date of Test Hours Tested PRODUCTION F(~R OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO 9-06-77 4.1 TEST PERIOD I~ 1~9Z-9 1%qc, .1 0 35° 82~: Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press-1124 --- 24-HOUR RATE I~ 991R R1F, 7 0 27° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None * NOTE: Perforated well 5/8/77. Perforations added and re-perforated 9/3/85. Workover performed 3/13/88. (Dani) TEMP3/105 . . Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS FORMATION TESTS · , NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top 5adlerochit 9201 ' 8711 ' N/A Base Sadl erochi t 9533 ' 9038' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,() ~/~ t,~ '~/J~ ~ Title Associate Engi neet Date /.o" ~-c~ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for; each additional interval to be separately produced, showina the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALA,. ,.A OIL AND GAS CONSERVATION CON.. ,ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging ~ Perforate ~ Pull tubing Alter Casing j~ Other Xt WORKOVER 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 639' FSL, 797' FEL, Sec. 2, T10N, R15E, UN At top of productive interval 1704' FSL, 1287' FWL, Sec. 1, T10N, R15E, UN At effective depth 1718' FSL, 1347' FWL, Sec. 1, T10N, R15E, UN At total depth 1723' FSL, 1359' FWL¢ Sec. 1~ T10N~ R15E¢ UH 11. Present well condition summary Total depth: measured 9655'MD true vertical 9158'TVD feet feet 5. Datum elevation (DF or KB) RKB 54 ' 6. Unit or Property name Prudhoe Ba~/ Unit 7. Well number 9-6 8. Approval number 8-06 9. APl number 50w 029-20216 10. Pool Prudhoe Bay Oil Pool Plugs (measured) None Effective depth: measured 9565 'ND true vertical 9069 'TVD feet feet Junk(measured) None Casing Length Size Conductor 78' 20" Surface 2715' 13-3/8" Production 8814' 9-5/8" Liner 1150' 7" Cemented Measured depth 295 sx 78 'MD 550 sx'AS cmt 2715'MD 1000 sx Cl ass G & 8814'MD 300 sx AS cmt 230 sx Class G 8498'-9648'MD True Vertical depth 78 'TVD 2715 'TVD 8333 ' TVD 8042'-9154'TVD Perforation depth: measured true vertical 9208'-9214', 9220'-9282', 9285'-9320' 9365'-9397', 9428'-9455', 9489'-9514' 8717'-8726', 8732'-8793', 8797'-8832' 8875'-8907', 8938'-8964', 8998'-9023' Tubing (size, grade and measured depth) 7"/5-1/2"/4-1/2", L-80 ~ 8557 ' Packers and SSSV (type and measured depth) 3H pkr (,~ 8455' & Bal-O SSSV @ 2185' , 9331'-9346' , 8842'-8857' RECEIVED 12. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure Gas Cons. C0mmisSiQ~ Anchorage - ' 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments (Workover Well Hi story) Daily Report of Well Operations ~ Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correct to the best of my knowledge · Signed Form 10-404 Rev. 12-1-85 Title Associ ate Engineer Date (Dani) SW03/60 Feet Submit in Duplicate ARCO Oil and Gas Company Well History - Initial Report- Dally Inetlllctlenl: Prepare and submit the "lnilill RII)eI'I" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District I County, parisl~ or borough ARCO Alaska, Inc. J NORTH,SLOPE Field Itease or Unit PRUDHOE BAY UNIT I ADL: 28327 Auth. or W.O, no, ITme AS 1924 J WORKOVER IState DS 9-6 Iwell no. API: 50-029-20216 Operator ARCO Spudded or W.O. begun IDate ACCEPT J 02/11/88 Date and depth as of 8:00 a.m. 02/12/88 ( TD: 9655 PB: 9565 SUPV:CD 02/13/88 ( TD': 9655 PB: 9565 SUPV:CD 02/14/88 ( TD: 9655 PB: 9565 SUPV:CD 02/15/88 ( TD: 9655 PB: 9565 SUPV:CD 02/16/88 ( TD: 9655 PB: 9565 SUPV:CD 02/17/88 ( TD: 9655 PB: 9565 SUPV:CD Complete record for each day reported POOL 102 IHour 1800 HRS IARCO W.I. 22.0000 Prior status if a W,O. WAIT ON SEAWATER MW: 8.5 SEAWATER MOVE RIG .TO DS 9-6. RU AND ACCEPT RIG AT 1800 HRS, 2/11/88. RU }{AND LINE TO KILL TANK. FILL PITS W/ SEAWATER. PULL BPV. KILL WELL. WAIT ON SEAWATER. DAILY:S46,826 CUM:$46,826 ETD:S46,826 EFC:$873,000 NU BOPE MW: 8.5 SEAWATER DISPLACED HEC PILL. PUMPED 360 BBS DOWN THE ANNULUS. ANNULUS ON VACUUM. PUMPED 120 BBLS HEC DOWN THE TUBING. ATTEMPTED TO FILL HOLE. PUMPED 50 BBLS HALLIBURTON TEMBLOK 120. WAITED 1 HOUR. ATTEMPTED TO CIRCULATE. TUBING ON VACUUM. PUMPED 2ND 50 BBLS TEMBLOK PILL. WAITED 1.75 HOURS. ATTEMPTED TO CIRCULATE. FLUID TO SURFACE WITH 14 BBLS AWAY. MONITORED WELL. FLUID LOSS 50 BBLS/HR. SET BPV. ND TREE. NU BOPE. DAILY:S61,521 CUM:$108,347 ETD:S108,347 EFC:$873,000 TESTING BOPE MW: 8.5 SEAWATER CONTINUED NU BOPE. TESTED TO 5000 PSI. SPEARED 5-1/2" TUBING. LD 5-1/2"TUBING HANGER. CIRCULATE BOTTOMS UP. MONITORED WELL. POOH. LD 264 JTS 5-1/2", 17#, L-80, AB-MOD TUBING. CHANGED RAMS TO 3-1/2" AND TESTED TO 5000 PSI. DAILY:S27,125 CUM:$135,472 ETD:S135,472 EFC:$873,000 TIH MW: 8.5 SEAWATER INSTALLED WEAR BUSHING. REPAIRED HYDROMATIC. STRAPPED 3-1/2" DP & BHA. TIH. SLIPPED DRILLING LINE. CONTINUED TIH. TAGGED FISH @ 8231'. MILLED OVER & LATCHED FIF,. , SHEARED. POOH. LD FISH. MU BHA. TIH WITH OVERSHOT~' RETRIEVE PBR BARREL AND K-ANCHOR. DAILY:S34,358 CUM: $169,830 ETD:S169, 830 EFC: $ 87 ~ D.~O~ LD FISHING TOOLS MW: 8.5 SEAWATER CONTINUED TIH. LATCHED FISH ~ RELEASED K-ANCHO~,,..~il FISH & FISHING TOOLS. MU PACKER MILLING SHOE. '~.~. MILLE PACKER. CIRCULATE BOTTOMS UP. DAILY:S25,204 CUM: $195,034 ETD:S195,034 EFC:$873,000 POOH WITH CASINGCUTTER MW: 8.5 SEAWATER RIH WITH 8.45" GR/JB. COULD NOT GET BELOW 8020'. ROUND TRIP 9 5/8" CASING SCRAPPER TO 8498'. TEST 9-5/8" CASING TO 2500 PSI FOR 30 MIN. OK. TIH WITH - 5/8" MECHANICAL CUTTER. CUT 9- 5/8" CASING @ 2127'. POOH. DAILY:S47,215 CUM:$242,249 ETD:S242,249 EFC:$873,000 The above is correct For form preparatiol~//and distribution, see Procedures Ma{:~tal, Section 10, Drilling, Pages 86 aT3d 87. IDate Title I 3-~4-~ I ASSOCIATE ENGINEER AR3B-459-1-D Number all dally well hlatow forms consecutively as they are prepared for each well. lPage no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforaiing, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form: 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string unfil completion. District County or Parish State NORTH SLOPE AK Lease or Unit I no. DS 9-6 Field ARCO Alaska, Inc. PRUDHOE BAY UNIT Date and depth as of 8:00 a.m. 02/18/88 ( TD: 9655 PB: 9565 SUPV:RO 02/19/88 ( TD: 9655 PB: 9565 SUPV:RO 02/20/88 ( TD: 9655 PB: 9565 SUPV:RO 02/21/88 ( 1 TD: 9655 PB: 9565 SUPV:RO 02/22/88 ( 1 TD: 9655 PB: 9565 SUPV:RO 02/23/88 TD: 9655 PB: 9565 SUPV:RO Signature For form preparation ar~l' distribution see Procedures Manual)Section 10, Drilling, Pages 86 and',~7 Complete record for each day while drilling or workover in progress POOL 102 LAYING DOWN 9-5/8" CSG MW: 8.5 SEAWATER CUT 9-5/8" CASING @ 2097'. POOH LD CUTTER. MU 9-5/8" SPEAR. TIH AND SPEAR CASING. PULL CASING LOOSE. TOOK 152000~ TO PULL. LAY DOWN MANDREL HANGER AND 9-5/8" CASING. DAILY:S25,213 CUM:$267,462 ETD:S267,462 EFC:$873,000 RD BACK-OFF TOOLS MW: 8.5 SEAWATER LD 9-5/8" CASING & CASING TOOLS. MU 12-1/4" BIT & BHA. TIH TO 1277'. CIRC. OUT ARCTIC PACK. TIH TO 2097'. CIRC. OUT ARCTIC PACK. TESTED ARCTIC PACK LAP TO 3000 PSI - OK. POOH. MU TRI-STATE BACK-OFF TOOL AND TIH. CUT DRILL LINE. TIH & ATTEMPT TO BACK-OFF @ 2187' - NO SUCCESS. ATTEMPT TO BACK-OFF @ 2148' - NO SUCCESS. POOH. LD TOOLS AND SEND TO SHOP. DAILY:S25,438 CUM:$292,900 ETD:S292,900 EFC:$873,000 WORK ON HYDROMATIC MW: 8.5 SEAWATER WAIT ON TRI-STATE TOOL. MU TOOL & TIH TO 2187'. ATTEMPTED TO BACK-OFF. POH. SEND TOOL TO SHOP. MU 8-1/2" MILL. TIH. POH & LD MILL. MU JET BASKET & TIH TO 2237'. CIRCULATE OUT DIESEL WITH SEAWATER. TIH TO 3495'. WORKED ON HYDROMATIC - BEARING GOING OUT. DAILY:S25,249 CUM:$318,149 ETD:S318,149 EFC:$873,000 PICK UP 9-5/8" SPEAR MW: 8.5 SEAWATER WORKED ON HYDROMATIC. TIH TO 8470'. ATTEMPTED TO RECOVER FISH OFF EZSV W/ REV. JET BASKET. POOH. NO RECOVERY. LD BHA. MU BACK-OFF TOOL & TIH TO 2187'. ATTEMPT TO BACK-OFF CASING @ 2187'. POSSIBLE BREAK. BOTTOM SLIPS RELEASE. POOH. LD BACK-OFF TOOL & STAND BACK DRILL COLLARS. PREPARE TO PICK UP 9-5/8" SPEAR AND TIH. DAILY:S34,831 CUM:$352,980 ETD:S352,980 EFC:$873,000 POH W/TAPERED MILL MW: 8.5 SEAWATER REWORKED BACK-OFF TOOL. MU 8-1/2" BIT & BHA. TIH TO 2248'. CIRC. CLEAN WARM SEAWATER. POH. MU BACK-OFF TOOL. LD TOOL. MU MULTI-STRING CUTTER & TIH TO 2097. ATTEMPT TO WORK INTO STUB. NO SUCCESS. POOH. MU 8-1/2" TAPER MILL & BHA. TIH TO 2097'. MILLED ON SLIP SEGMENT. WORKED STUB. POOH. ~,~ DAILY:S31,664 CUM:$384,644 ETD:S384,644 RFC:S8 POH W/9-5/8" SPEAR MW: 8.5 SEAWAT~.~>~'~ POOH WITH MILL. MU MULTI-STRING CUTTER. TIH. CUT CASI~ 2105'. POOH W/ CUTTER. MU SPEAR & TIH. PULLED ON STUB. RELEASED SPEAR & POH. MU 9-5/8" SECTION MILL &~T;~"~F~ & WITH MILL. TIH WITH MILL. MILLED ON CSG @ 2105'~ POOH WITH MILL. TiH WiTH 9-5/S" $EEAK. JAKAED ON $iUB. ASSOCIATE ENGINEER AR3B-459-2-B Number all daily well hisfory forms consecutively as lhey are prepared for each well. ARCO Oil and Gas Company ~, Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently then every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ unlil completion. District ICounty or Parish Stale NORTH SLOPE AK Lease or Unit DS 9-6 Field ARCO Alaska, Inc. PRUDHOE BAY UNIT no. Date and depth as of 8:00 a.m. 02/24/88 ( 1 TD: 9655 PB: 9565 SUPV:RO 02/25/88 ( 1 TD: 9655 PB: 9565 SUPV:RO 02/26/88 ( 1 TD: 9655 PB: 9565 SUPV:CD 02/27/88 ( 1 TD: 9655 PB: 9565 SUPV:CD 02/28/88 ( 1' TD: 9655 PB: 9565 SUPV:CD Complete record for each day while drilling or workover in progress POOL 102 SPEAR & POH. DAILY:S29,118 CUM:$413,762 ETD:S413,762 EFC:$873,000 JARRING ON 9-5/8" CSG MW: 8.5 SEAWATER JARRED ON 9-5/8" CASING. POOH. MU 8-1/2" TAPERED MILL & TIH. RAN MILL FROM 2097'-2110'. CIRCULATED HOLE CLEAN. POOH. MU RTTS & TIH. SET RTTS @ 2103'. TESTED 9-5/8" CASING TO 2000 PSI. POOH. RU DRESSER. RAN VERTILOG FROM 2300' TO 2097'. RAN CBL F/2500'-2097' RD DRESSER. MU TRI-STATE MULTI-STRING CUTTER. TIH TO 2105'. CUT 9-5/8" CASING. POOH. MU 9-5/8" SPEAR. JARRED ON 9-5/8" CASING. DAILY:S32,885 CUM:$446,647 ETD:S446,647 EFC:$873,000 POOH MW: 8.5 SEAWATER CONTINUED JARRING ON FISH. POOH. LD FISH. MU MILL. TIH. DRESSED TOP 9-5/8". POOH. MU CUTTER. TIH. CUT 9-5/8" CASING @ 2190'. POOH. TIH WITH SPEAR. POOH WITH 9-5/8" FISH. LD FISH & CLEARED FLOOR. MU 9-5/8" DRESS-OFF TOOL. TIH. DRESSED 9-5/8" CASING STUB. POOH. DAILY:S25,098 CUM:$471,745 ETD:S471,745 EFC:$873,000 REVERSE CIRC. W/DIESEL MW: 8.5 SEAWATER CONTINUED POOH. RU & RAN 56 JTS 9-5/8", 47#, NT-80 NSCC CASING. REVERSE CIRC. 170 BBLS CASING PACK. ATTEMPTED TO STAB PATCH OVER CASING STUB. POOH. LD 9-5/8" CASING. RD CASING TOOLS. CLEANED FLOOR. MU MILL & TIH. MILLED TOP OF STUB. REVERSE CIRC. DIESEL TO BALANCE FLUIDS. DAILY:S122,428 CUM:$594,173 ETD:S594,173 EFC:$873,000 ATTEMPT 9-5/8" BACKOFF @ 2227' MW: 8.5 SEAWATER CONTINUED REVERSE CIRC. POOH. PU BACKOFF ASSY. TIH. ATTEMPTED BACKOFF @ 2227' POOH. REPIN & FUNCTION TEST TOOL - OK. TIH. ATTEMPTED BACKOFF. POOH. PU 12 4-3/4" DC & 1 6-1/2" DC; TIH. SLIP 24' DRILL LINE. ATTEMPTED BACKOFF OF 9-5/8" CASING @ 2227'. DAILY:S24,838 CUM:$619,011 ETD:S619,011 EFC:$873,000 RU GEARHART WIRELINE MW: 8.5 SEAWATER ATTEMPTED TO BACKOFF 9-5/8" CASING. THE CASING APPEARS TO BE BROKE & BACKING OUT. POH. LD BACKOFF TOOL & BHA. PU SPEAR & TIH. ATTEMPTED TO BACK OUT 9-5/8" CASING. 3-1/2" DP BROKE. POOH. CLEARED FLOOR. WAITED ON NEW GRAPPLE & TIH. ATTEMPTED TO BACKOFF AGAIN. THE 3-1/2" DP BROKE. POOH. WAITED ON 5" DP. LOADED PIPE SHED SLM. TIH. RU GEARHART WIRELINE. DAILY:S25,090 CUM:$644,101 ETD:S644,101 EFC:$873,000 Signature For form preparation ,a~d distribution see Procedures Mand~q Section 10, Drilling, Pages 86 and 87 IDate ITitle 3-~4-8~ ASSOCIATE ENGINEER AR3B-459-2-B I N umber all daily well history forms consecutively as Ihey are prepared for each well. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number ail drill stem tests sequentially. Attach description of ali cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative te~t on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string unlll completion. District Field ARCO Alaska, Inc. County or Parish State NORTH SLOPE AK ILease or Unit DS 9-6 PRUDHOE BAY UNIT IWell no. Date and deptl~ as of 8:00 a.m. 02/29/88 ( 1 TD: 9655 PB: 9565 SUPV:CD 03/01/88 ( t TD: 9655 PB: 9565 SUPV:CD 03/02/88 ( 2, TD: 9655 PB: 9565 SUPV:CD 03/03/88 ( 2i TD: 9655 PB: 9565 SUPV:CD 03/04/88 ( 2 TD: 9655 PB: 9565 SUPV:CD 03/05/88 ( 2 TD: 9655 PB: 9565 SUPV:CD Complete record for each day while drilling or workover in progress POOL 102 SAW 9-5/8" CASING F/ROUGH MW: 8.5 SEAWATER RIH WITH STRING SHOT. BACKED OFF 9-5/8" CASING. POOH WITH FISH. BROKE @ 2330'. TIH WITH 5" DP. POOH. LD DP. RU & RAN 60 JTS 9-5/8", 47#, NT-80, NCSS CSG TO 2335' REVERSE CIRC. CASING PACK 250 BBLS. SCREWED INTO THE 9-5/8". TESTED ANNULUS TO 700 PSI. ND BOPE. SET 9-5/8" SLIPS WITH 200,000#. SAW 9-5/8" CASING FOR ROUGH CUT. DAILY:S29,611 CUM:$673,712 ETD:S673,712 EFC:$873,000 POOH MW: 8.5 SEAWATER CUT AND DRESS 9-5/8" CSG. INSTALL PACKOFF. NU BOPE STACK. TEST 9-5/8" PACKOFF TO 3800 PSI. TEST 9-5/8" CASING TO 2500 PSI. TEST 9-5/8" X 13-3/8" ANNULU TO 2000 PSI. OK. CHANGE HYDRILL RUBBER. TEST BOPS. INSTALL W.B. MU BHA. TIH. CIRC OUT ARCTIC PACK. CONT TIH. WORK SET BASKET. POOH. DAILY:S148,192 CUM:$821,904 ETD:S821,904 EFC:$873,000 MILL ON JUNK MW: 8.5 SEAWATER CONT POOH. CLEAN AND LD JET BASKET. PU 8-1/2" MILL AND BOOT BASKET . TIH. CUT DRLG LINE. CONT RIH. MILL ON JUNK AT 8472' TO 8473'. POOH. CLEAN BOOT BASKET. PU NEW 8-1/2" MILL. TIH. MILL ON JUNK AT 8473'. DAILY:S38,655 CUM:$860,559 ETD:S860,559 EFC:$873,000 MILL ON JUNK MW: 8.5 SEAWATER MILL ON JUNK AT 8473'. POOH. RU SOS. RUN GAUGE RING AND JB. RD SOS. MU MILL AND BHA. TIH. CUT DRILL LINE. TIH. MILL ON JUNK. DAILY:S95,304 CUM:$955,863 ETD:S955,863 EFC:$873,000 TIH W/ 8-1/2" MILL MW: 8.5 SEAWATER MILL ON JUNK AT 8473'. POOH. MU 8-1/2" GLOBE BASKET BHA AND RIH. RU DOWELL N2 UNIT. DISPLACE 3-1/2" DP W/ 18950 CU/FT N2. RD DOWELL. SURGE WELL. POOH W/ GLOBE BASKET. LD GB BHA. MU 8-1/2" MILL BHA AND RIH. DAILY:S29,448 CUM:$985,311 ETD:S985,311 EFC:$873,000 POOH LOOKING FOR WASHOUT MW: 8.5 SEAWATER MU 8-1/2" MILL & TIH. MILLED ON JUNK @ 8473'. POOH & CHANGED OUT MILL. TIH. MILLED ON JUNK @ 8473'. CHECK PUMP & SURFACE EQUIPMENT FOR LEAKS. POOH & LOOKING FOR WASHOUT. DAILY:S24,880 CUM:S1,010,191 ETD:S1,010,191 EFC:$873,000 For form preparatioF//and distribution see Procedures Ma(~al Section Drilling, Pages 86 and 87 IDate ITi''~ ASSOCIATE ENGINEER 3-24-a5 AR3B-459-2-B i Number all daily well hislory forms consecutively as they are prepared for each well. ARCO Oil a,,d Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of alt cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District ICounty Or Parish IStafe NORTH SLOPE J AK Lease or Unit DS 9-6 Field ARCO Alaska, Inc. PRUDHOE BAY UNIT JWell no, Date and depth as of 8:00 a.m. 03/06/88 ( 2 TD: 9655 PB: 9565 SUPV:CD 03/07/88 ( 2 TD: 9655 PB: 9565 SUPV:CD 03/08/88 ( 2 TD: 9655 PB: 9565 SUPV:CD 03/09/88 (2') TD: 9655 PB: 9565 SUPV:CD 03/10/88 (23) TD: 9655 PB: 9565 SUPV:CD 03/11/88 (2)) TD: 9655 PB: 9565 SUPV:CD I 03/12/88 ( 3 ) TD: 9655 PB: 9565 SUPV:CD Complete record for each day while drilling or workover in progress POOL 102 TIH WITH 8-1/2" MILL MW: 8.5 SEAWATER POOH LOOKING FOR WASHOUT - NONE FOUND. CHANGED OUT JARS & BUMPER SUB. SLIP & CUT DRILL LINE. MU MILL & BHA. TIH. MILLED ON JUNK @ 8473'. POOH. TIH WITH NEW MILL. DAILY:S25,153 CUM:$1,035,344 ETD:S1,035,344 EFC:$873,000 TIH WITH 8-1/2" MILL MW: 8.5 SEAWATER TIH WITH 8-1/2" MILL. MILLED ON JUNK @ 8473'. POOH WITH 8-1/2" MILL. EMPTY BASKETS. CHANGED MILL. TIH. CUT DRILL LINE. TIH. DAILY:S26,895 CUM:$1,062,239 ETD:S1,062,239 EFC:$873,000 TIH WITH JET BASKET MW: 8.5 SEAWATER MILL ON JUNK @ 8473'. POOH. MU NEW 8 -/2" MILL. TIH. SLIP DRILLING LINE. TIH. MILL ON JUNK. POOH WITH MILL. MU REV CIRC JET BASKET AND TIH. DAILY:S32,490 CUM:$1,094,729 ETD:S1,094,729 EFC:$873,000 POOH WITH 8-1/2" HILL MW: 8.5 SEAWATER TIH WITH REV JET BASKET. CIRC @ 8473'. POOH. MONITOR WELL. MIX AND PUMP 50 BBL HEC PILL. POOH. MU 8-1/2" MILL AND TIH. MILL ON JUNK. EZSV @ 8473'. WASH TO TOP OF LINER @ 8498'. CBU. SPOT HEC PILL. POOH. DAILY:S26,515 CUM:$1,121,244 ETD:S1,121,244 EFC:$873,000 POOH FOR NEW MILL MW: 8.5 SEAWATER POOH. LD 8 -/2" MILL AND 6-1/4" JARS. PU 6" MILL AND 4-3/4" BHA. TIH. TAG LINER TOP @ 8497'. MILL ON JUNK FROM 8497'-8509'. TIH 8509'-9514'. MILL ON JUNK FROM 9514'-9516'. POOH FOR NEW MILL. DAILY:S26,524 CUM:$1,147,768 ETD:S1,147,768 EFC:$873,000 PREPARE TO LD DP MW: 8.5 SEAWATER POOH. LD 6-1/2" DC. PU 6" MILL. TIH. MILL ON JUNK AND CLEAN OUT TO PBTD @ 9565'. CIRC. REVERSE CIRC SWEEP. POOH LD BHA. MU 9-5/8" RTTS. TIH. SET RTTS @ 8490'. TEST 9-5/8" CASING TO 2500 PSI FOR 30 MIN. PREPARE TO LD 3-1/2" DP. DAILY:S27,727 CUM:$1,175,495 ETD:S1,175,495 EFC:$873,000 RUNNING TUBING MW: 8.5 SEAWATER POOH LDDP. PULL WEAR BUSHING. CHANGE RAMS. TEST BONNETT SEAL. RU AND RUN 66 JTS 26~ L-80 LTC IPC CLASS A 7" TUBING, 70 JTS 17# L-80 LTC AB MOD IPC.CLASS B 5-1/2" TUBING, 55 JTS 17# L-80 LTC AB MOD IPC CLASS A 5-1/2" TUBING, 2 JTS 12.6# L-80 BTC AB MOD IPC CLASS A 4-1/2" TAILPIPE. TAIL @ 855~%. DAILY:S29,790 CUM:$1,205,285 ETD:S1,205,285 EFC:$873,000 The above is correct Drilling, Pages 86 and 87 Oate [Title 3- f4-,~,~ ASSOCIA~ ENGINEER AR3B-459o2-B l' '" ' Number all daily well history forms consecutively ; ,,] ' as they are prepared for each well. ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after al!owable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available, Accounting cost center code District ARCO Alaska, Inc. PRUDHOE BAY UNIT County or Parish NORTH SLOPE Lease or Unit ADL: 28327 ITitle WORKOVER State AK DS 9-6 Jwan no. Auth. or W.O. no. AS1924 50-029-20216 Operator A. RCo. W.I. ARCO 22. 0000 - Spudded or W.O. begun Date ACCEPT 02/11/88 Date and depth Complete record for each day reported as of 8:00 a.m. POOL 102 03/13/88 ( 31 TD: 9655 PB: 9565 SUPV:CD Iotal number of wells (active or inactive) on this Dst center prior to plugging and I bandonment of fhis well . our IPrlor status if a W,O, 1800 HRS RIG RELEASED MW: 8.5 SEAWATER LAND TUBING. SET BPV. ND BOP. NU 7" 5000# TREE. TEST PACKOFF, CONTROL LINE, AND TREE TO 5000 PSI. CIRCULATE SEAWATER TREATED WITH C-193. PUMP 95 BBLS DIESEL DOWN TUBING. BULL HEAD 64 BBLS DIESEL DOWN ANNULUS. DROP BALL. SET PKR. TEST TUBING TO 3000 PSI. TEST ANNULUS TO 1500 PSI. BALL WOULD NOT SHEAR. SET BPV. RELEASE RIG @ 0400 HRS 3/13/88. (3H PACKER @ 8455', BAL-O SSSV @ 2185') DAILY:S310,374 CUM:$1,515,659 ETD:S1,515,659 EFC:$873,000 Old TD New TD Released rig Date PB Depth Kind of rig Classifications (oil, gas, etc.) Type completion (single, dual. etC.) Producing method Official reservoir name(s) Potential test data '~/ell no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T,P. C.P. Water % GOR Gravity Allowable Effective dale corrected ,. I The above is correct ~OL/ $-f~/-8~5 ASSOCIATE ENGINEER For form preparatiop//and distribution, see Procedures Ms.al, Section 10, Drilling. Pages 86 and 87. AR3B-459~3-C INumber all dally well history forms consecutively I Page no. as they ara prepared for each well. DIvlNon of AtlanlicRIchfleldCompan¥ ANCHORAF;[!i, AI...A..~KA 995t 0 DATE · ~-2Z-8 .IR f4'E:F'E;R'F..Nr.:F:: ~RCO C,A..~.F..I) HOI..~ F'TN~I... 7--?9 3-.~-R[I AC[II.I,~T I r: C[~I. -..VEl./.~ T GNA TI IRF'/R E' 9-8 ~-2Z-~ ACOII,~'r~c C~I..-VDI /,~'IRNATI.IRF'/GR HAVF' A NICE~Y~ Alasl(a Oil & Gas Cons. Anchor~Oe F'FG[;Y BENNETT ATD- J 529 I) .T ,~ T lq' ]' F~I.I'T' T RIIN t, 5" RIIN t. ~ · Fi'I.IN ~, ~; · $ CE'NTRAI... FII...F.".,S' ,.~ CH.F..VRON -'~ EY, T.F.-N,~.T. ClN EYF'I. [1RAT.ION ~~ EY.¥ON HARATH[IN "' HO~:~ I t.. F'~ T I...I... T F',S' F'R bJFI I.. FTI ~ RAF'f't ~ ,~I'ATF' tgF AI..A,.~KA " TFXACO · ~-- . STATE OF ALASKA "- ALASK,. OIL AND GAS CONSERVATION COMM. _,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown [] Re-enter suspended well ~ Alter casing Time extension [] Change approved program ~ Plugging [] stimulate [] Pull tubing ,~z~.Amend order ~ Perforate ~-~ Other~,~. 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, inc. RKB 54' 3. Address 6. Unit or Property name P. 0. Box 100:360, Anchorage, AK 99510-0360 Prudhoe Bay Unit 4. Location of well at surface 7. Well number 639' FNL, 797' FWL, Sec. 2, T10N, R15E, UM 9-6 At top of productive interval 1704' FNL, 1287' FEL, Sec. 1, T10N, R15E, UM At effective depth 1717' FNL, 1337' FEL, Sec. 1, T10N, R15E, UM At total depth 1723' FNL, 1359' FEL, Sec. 1, T10N, R15E, UM 8. Permit number 7§ -48 9. APl number 50-- 02~-20~1~ 10. Pool Prudhoe Ba~, Oil Pool 11. Present well condition summary Total depth: measured true vertical 9655 ' MD feet 91 58 ' TVD feet Effective depth: measured 9517 ' HD feet true vertical 9025 ' TVD feet Casing Length Size Conductor 78 ' 20" Surface 2715' 1 3-3/8" P roducti on 881 4 ' 9-5/8" Liner I 150 ' 7" Plugs (measured) Junk (measured) Cemented 295 sx 550 sx AS cmt 1000 sx Class G 230 sx Class G None RECEIVED None ~,~,~ska 0il & Gas Cons. ~mmissioa Measured depth irue Vertical depth 78~HD 78~TVD 2715~HD 2715~TVD 881~ ~HD 8333 ~TVD 8h98~-96~8~HD 80h2~-915~TVD Perforation depth: measured 9207 ' -921 4 ' 9365 ' -9397 ' true vertical 871 8 ' -8726 ' 8875'-8907' Tubing (size, grade and measured depth) 5-1/2", 17#, N-80 ~ 8429'MD Packers and SSSV (type and measured depth) Baker SAD pkr ~ 82~0'. Otis RD S.~SV ~ ?71c~, 12.Attachments Description summary of proposal , 9220'-9283', 9285'-9320', 9331'-9346', , 9428'-9455', 9489'-9514, , 8732'-8794', 8797'-8832', 8842'-8857', , 8938'-8964', 8998'-9023. Detailed operations program [] BOP sketch 13. Estimated date for commencing operation January 25, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,,~/)q/V~,~,Z,~ Title Associate Eqg~n~r Date Commission Use Only (JPS) SA3/45 Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI ..... Approved by 0R~O!~,.~.".~. ?"'?,,0 BY Form 10-403 Rev 1L;[,0~tlE C. SMITH Approved Copy Returned ~ _ Commissioner feet the commission Date Submit in triplicate ARCO PRUDHOE BAY WELL 9-6 WORKOVER ATTACHMENT TO APPLICATION FOR SUNDRY APPROVAL. ARCO ALASKA, INC., PROPOSES THE FOLLOWING WORK ON PRUDHOE BAY WELL 9-6. THE PRIMARY OBJECTIVE OF THIS WORKOVER IS TO REPLACE AN UPPER PORTION OF THE 9 5/8" INTERMEDIATE CASING THAT LEAKS PRESSURE TO THE 9 5/8" BY 13 3/8" ANNULUS. A SECONDARY OBJECTIVE IS TO REPLACE THE 5 1/2" TUBING WITH A NEW 5 1/2" BY 7" STRING. THIS PROPOSED WORK WILL PROVIDE A SAFER, CLEANER, PRODUCING ENVIRONMENT. 1. RU WIRELINE, SHOOT OFF TUBING ABOVE PACKER PBR. 2. CIRCULATE 8.6 PPG KILL WEIGHT SEAWATER. 3. SET BPV. 4. MIRU WORKOVER RIG. ND TREE. NU BOP'S. 5. PULL/LAY DOWN 5 1/2" TBG. 6. PU DP, RIH RETRIEVE SEAL ASSEMBLY. 7. RIH RETRIEVE PBR. 8. RIH MILL AND RETRIEVE PACKER. 9. RU WIRELINE. SET ClBP AT 8400. 10. TEST CASING TO 2500 PSI. 11. NO LEAK. SKIP TO STEP # 17 12. RIH W/RTTS AND FO CLOSING TOOL IN AN ATTEMPT TO LOCATE LEAK. 13. SET PACKER AT 2700'. 14. TEST CSG TO 2500 PSI ABOVE AND BELOW RTTS. 15. UNSEAT RTTS, ClRC 2700' DIESEL CAP. 16. POOH MAKE CSG TESTS AT 2150' AND 800' TO PINPOINT LEAKS. 17. RIH MECHANICAL CUT 9 5/8" CSG AT 2125'. POOH. 18. PULL 9 5/8" CSG. 19. ROUND TRIP 13 3/8 SCRAPER AND 12 1/4 BIT TO 2100' 20. ClRC AND TEST ARCTIC PACK LAP TO 2000 PSI. POOH. 21. RIH. BACK OFF 9 5/8" AT 2148' COLLAR. POOH. 22. RIH. RECOVER 9 5/8" CASING. POOH. 23. RUN NEW 9 5/8 NSCC CASING W/EXTERNAL CASING PACKER. 24. ClRC OB MUD DOWN ANNULUS IF TEST WAS GOOD IN STEP # 20. 25. SCREW INTO BUTTRESS 9 5/8" CASING WITH NSCC CASING. 26. TEST 13 3/8 BY 9 5/8 ANNULUS TO 2000 PSI. 27. SET ECP. TEST 9 5/8 CASING TO 2500 PSI. 28. INSTALL SLIPS, ND BOP'S, CUT CASING, INSTALL PACKOFF, NU AND TEST BOP'S. 29. RIH DRILL CIBP AT 8400'. POOH. 30. ROUND TRIP 7" SCRAPER AND 6" BIT. CLEAN OUT TO 9565'. 31. RUN FB PACKER ON DP SET AT 8250'. POOH. 32. DISPLACE WELL TO INHIBITED SEAWATER. 33. POOH, LDDP. 34. RUN 5 1/2" BY 7" TAPERED TUBING W/LIVE GLM'S. 35. FREEZE PROTECT WELL. 36. ND BOP'S, NU TREE. TEST WH, TBG, CSG. RELEASE RIG. 37. ARCTIC PACK WELL IF OB MUD WAS NOT CIRC IN STEP # 24. ANTICIPATED BHP = 3800 PSI WORKOVER FLUID = 8.6 PPG SEAWATER J.P. SCHUMACHER SR. DRILLING ENGINEER 12/30/87 ANNULAR PREVENTER PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 5 2 1. 13-3/8" CASING HEAD 2. 9-5/5" CASING HEAD 3. 5000 PSi TUBING HEAD 4, 15-5/6" - 5000 PSt BLIND RAMS 5. 13-5/8" - 5000 PSI PIPE PAroS 6, 13-5/ru" - 5000 PSI ANNULAR , . 10, tl, 12, !5, 14. ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSt WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED ',WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING ~OP S T ACK¥:~[~, & G~s Co~s. commissioD .... ~chorage FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL, CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WELLHEAD. RUN IN LOCK-DOWN SCREWS tN HEAD. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES, INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSt. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS, INCREASE PRESSURE TO 5000 PSI AHD HOLD FOR 10 MINUTES, CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES, BLEED DOWNSTREAr": PRESSURE TO ZERO PSi TO TEST VALVES, TEST REMAINING UNTESTED MANIFOLD VALVES. iF ANY. WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TOZEROPSI, OPEN PIPE RAMS. E~ACKOFF RUNNING JTAND PULL OUTOF HOLE, C~ '~ ~.~HD TEST ' ~O~E p'~ RAMS AND T'U SO00 PSI FOR !0 MINUTES, BLEED TO ZERO PSi. OPEN BLIND RAMS ANDRECOVEP, TESTPLUG. MAKESLIPE MANIFOLD ~ NES ARE FULL OF ARCTIC DIESEL AND ALL VALVE5 ARE SET IN THE DEtlLLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI, TEST KELLY COCKS AHD INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP RECORD TEST !NFOPMATION ON BLOWOUT PREVENTER TEST FORM, AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. NOVEMBER 21, 1986 ARC(] ALASK P, O, BOX ANCHORAGE, ALASKA 995t0 DATE: t2-22-87 REFERENCE".: ARCO CASED HOi...E FINAl... ~.. ~ 6-17 t 2-t t-87 '""' 9.-6 t 2- t 2-. 87 ~ 9--~ 8 t 2-t t -87 F'RODI..IC'FION I...O.F,/Spinner-Temp~'llN t, 5" NOISE/TEHF'EiRAI't.IRE". I...0[~ RI.IN t , 2" N O.T. SE / I'E HF'E]RA TI..IRE LOG R'[.IN F'I..EASE SIGN AND R[~~~J~EJ~,~C:~Y AS HAVE A NICE DAY !:\laskaOil& Gas Cons. 6OmlTI[SS[Oi! AnchOrage F'E 6, F., Y BENNETT ATO-t 529 RECEIPT OF DATA. TRANY $B7697 ~L AF'F'ROVED DISTRIBLITION SCH SCH SCH ¢ CENTRAl... FILES ,,,-'"CHEVRON I) & M ¢ EXTENSION EXF't..ORAT.I. ON $ EXXON MARATHON ~ MOBIL PHII...L..IPS F'B WELL FILES R & D SAF'£ STATE OF ALASKA TEXACO A N C I--I 0 I:~'. A 6 Iii:, A I.. A ~;' K A I:;: I:i; I::' I:!: I:;.'. Ii!' N C Ii!: · A R C 0 C A,.~' !!!: D 1..I r)I... E F:' .1' N Al.. I::' I.. Ii!: A,¢,' E 5.' I f;; N ¢..', N.f') R t!? TI. IF;.' N T I..I E A 'ir' T A C I-.I E.f) C f:'~ P Y A ;':.' I:;.'li!' C !::' T F"lf' O I::' I) A'f' A ,, 1:;..'17 C E I V I!i: f.) B Y .......................................................... 1..1A %," Ii!: A N :l: C E ,!) A Y' ! F:'I!:; ('; 6; hr' B E N N E T T A 'f' O '-' "i !!~ 2 9 'f' F;.'. A N Y :I',: ii'.','7 6 6 ,.'5 A P F:' F;.'. O ".; E .f.':, ................... ._f~ ................................. v f.) I ,?:."f' t:;,' I B !1 'r I f;'~ t'..~ ARCO Al.a_'¥k~, Inc,, F:'..O. Bc, x t0~36~ A'ncho'~"age, AL.a,~ka 99~ .0 DATE' H~¥ t4: t98'7 REF'E:RENC. E' AR(_-.'() Ca::_-':ed Ho [e F:i'na I. ARCO Alaska, Inc. F'.O. Box t cJO3&O Anchorage, A I. aska 995t,0 DATE: Hay t5, t987 REFERENCE: ARCO Cased HoLe FinaL t-28 4-:22--87 I--Lowmeter/CCL Run t, 5" Camco 2-8 4-t3-87 Leak Det,/Temp/F[owme~er Run t, 5" Camco :_~--9 4-t0-8'7 Leak Der. Run t, 5" Camco .3-22 4-'i5-87 FLuid I.D./GR/Temp ~ I~ ~". Ca~o ~-'22 4-29-87 FLop. F'.L,(CCL/GR/Telnp) Run ~, 5' Ech .3-25 4-~ 5-87 F Lowmefer/GR Run 5-25 4-.~&.-.87 Pump in Te~np. S~rvey Run 4-~7 4-~-~7 Inj. Profi[e Run 6-22 4-~9-87 FLop.F',L.(CCL/GR/Temp) Run ~, 5' Sch 6-23 4-2~-87 FLop.P.L. (CCL/GR/Ten~p) Run ~, 5" Ech 9-4 4-22-87 CoLLar Log (s'et bridge plug) Run ~, 5' Gear 9'6 4-3-87 CoL[ar & F'erf. Log Run ~, 5' Gear 9-...28 4--~6-87 CoLLar Log(~et AVA &DW pack) Run ~, ~" & 5" Gear · lf-t 4.-2~-87 F'rod. F'rofi[e/FLow/FLuid I.g Run f, 5" Camco ~-.~ 4-~'7.-..8'7 F'Lop.P.L.(CCL/GR/Temp) Run ~, 5" Sch ii-15 4-i8..-87 F-Lop.F'.L.(CCL./GR/Ten~p) Run t, 5" Sch iS-2t 4--29-.87 Inj. Profi le/Flowmeter Run i, 5' Camco t5-25 4-25-87 Inj. F'rofi Le/Flown~eter Run i, 5' Camco i5'~2 4-i?-87 In j. F'rofi Le/Flowme'[er Run i, 5' Camco t4-.2~ 4-5-87 CH CNL Run ~, 5' Sch i4-~5 4-4-87 CH CNL Run ~, 5' Ech ~6-24 4-5-87 Flop.F'.L.(CCL/GR/Temp) Run 2, 5' .~ch i8-2- 4.-i2....87 Flowmeter/Tenm/F'luid Density Run i, 5' Camco t8-8 4-22-87 Flowmefer/Fluid Denm"ity Run t, 5" '~:,=~,,,::o F:'l. ea~e sign and//~tu,~.~.~kl~e,/Attached copy as rece HAVE A ~E .. , Cons. COrn ' Al:) P roved ........ DISTRIBUTION ipt of data, Central F:'i Les Chevron :,?. Ex 'l'en:s i on Exp I. ora t i on · ,r Ex xon Mara '1' h on :~ Mob i L F'hi LLips F'B WeLL Fi Les R & D ARCO Alaska, Inc. Prudhoe Bay ~ngineering Post Office Bo× 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 24, 1987 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re' DS 9-6 Approval No. 87-75 Enclosed is the "Subsequent" Sundry Notice detailing work completed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/FEB/sd ' Enclosures cc: Standard Alaska Production Company File: P1(DS9-6)W1-3 ARCO Alaska, inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASr~,-, OIL AND GAS CONSERVATION COMI,,..,SSION REPORT .OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 54' RKB Feet 3. Address 6. Unit or Property name Post Office Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 639' N & 797' W of SE cf, Sec. 2, T10N, R15E, UM 7. Well number pS 9-6 At top of productive interval 1704' N & 1287' E of SW cr, Sec. At effective depth 1717' N & 1337' E of SW cr, Sec. At total depth 1723' N & 1359' E of SW cf, Sec. 1, TION, R15E, UM 1, TION, R15E, UM 1, TION, R15E, UM 8. Approval number 87-75 9. APl number 50-- 029-20216 10. Pool Prudhoe Bay 0ii Pool 11. Present well condition summary Total depth: measured true vertical 9655 feet Plugs (measured) 9158 feet Effective depth: measured true vertical 9517 feet Junk (measured) 9025 feet Casing Length Size Conductor 78' 20" Surface 2714' 13-3/8" Cemented Measured depth 295 SX 78' 550 SX Arctic Set cmt 2714' ~ue Vertical depth 78' 2714' Production 8814' 9-5/8" 1000 sx Class G cmt 8814' 8333' Liner 1150' 7" Perforation depth: measured 9204-9212' 9425-9452' true vertical 8718-8726' 8935-8961' Tubing (size, grade and measured depth) 5½", N-80 @ 8429 'MD Packers and SSSV (type and measured depth) Otis RQ SSSV @ 2219' 230 sx Class G , 9218-9318', 9327-9342' , 9472-9515 , 8732-8775', 8839-8853' , 8981-9023' , Baker SAB Packer @ 8290' 8498-9648' 9154' , 9360-9373', 9384-9394', , 8871-8884', 8895-8904', 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or'Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 5631 6270 7647 50 10223 10971 6808 10 Tubing Pressure 313 351 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run i-L; 15.1 hereby certify that the foregoing is true and correct to the best of my knowledge ~ /',¢?__~:~'-~- Signed '~.r~Jf~ Title Operations Engineering Manager Date Form 10-404 Rev. 12-1-85 FFR (76~-476l') Submit in Dupli.cate SUMMARY OF OPERATIONS Began perforating operations on 4/3/87. S/I well, pressure tested equipment. RIH w/gun #1, perforated shots fired. RIH w/gun #2, 9283-9298', POOH, all shots RD, returned well to production. RU perforating unit, 9298-9318' POOH all fired. Secured well, ARCO Alaska, Inc. Prudhoe Bay"~ngineering Post Office Bo× 100360 Anchora§e~ Alaska 99510-0360 Telephone 907 263 4248 Operations Engineering Manager January 28, 1987 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re: DS 9-6 Permit No. 76-48 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/FEB-sd Enclosure ~ cc' Standard Alaska Production Co. File Pl(DS9-6)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichtieldCompany STATE OF ALASKA ALASt,., OIL AND GAS CONSERVATION COMN..,,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [J Alter casing l';] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order,~ Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address Post Office Box 100360~ Anchorage~ AK 99510 4. Location of well at surface 639' N & 797' W of SE ct, Sec. 2, T10N, R15E, UM At top of productive interval 1704' N & 1287' E of SW cr, Sec. 1, TION, R15E, UN At effective depth 1717' N & 1337' E of SW cr, Sec. 1, TION, R15E, UM At total depth 1723' N & 1359' E of SW cr~ Sec. 1~ TION~ R15E, UN 11. Present well condition summary 9655 Total depth: measured feet Plugs (measured) true vertical 9158 feet 5. Datum elevation(DF or KB) 54 ' RKB 6. Unit or Property name Prudhoe BaS Unit 7. Well number DS 9-6 8. Permit number 76-48 9. APl num~J_20216 50-- 10. 'P~Judhoe Bay 0il Pool feet Effective depth: measured 9517 feet Junk (measured) true vertical 9025 feet Casing Length Size Cemented Measured depth ~ue Vertical depth Conductor 78' 20" 295 sx 78' 78' Surfac~ 2714' 13-3/8" 550 SX Arctic Set cmt 2714' 2714' Production 8814' 9-5/8" 1000 sx Class G cmt 8814' 8333' Liner 1150' Perforation depth: measured 7" 230 sx Class G 8498-9648' 9154' 9204-9212' 9218-9283' 9327-9342' 9360-9373' 9384-9394' , ' ' ' ' 9425-9452' 9472-9515 true vertical 8718-8726', 8732-8796', 8839-88.~' ¢~i~'¢8,884' 8895-8904' 8935-8961', 8981-9023' ~ .... ...... ' Tubing (size, grade and measured depth) 5½", N-80 @ 8429'MD Packers and SSSV (type and measured depth) ' Otis RQ SSSV ¢ 2219', Baker SAB Packer ¢ 8290' ~,s~O~&A;;cber,Oe"*"" "' .... 12.Attachments Description summary of proposal 13. Estimated date for commencing operation February 6, 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby,certify that the foregoing is true and correct to the best of my knowledge Signed ,~'/d~¢~,/~~/~~ _-- Title Operations Engineering Manager _ Commission Use Only Date Conditions of approval Approved by Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Commissioner I Approval No. ? ,- 7.~' Subsequent Wo~ l~leporre{:i by order of ~ ~ ~, the commission Date i-~'~'/ Form 10-403 Rev 12-1-85 FEB (263-4261) Submit in triplicate Attachment to Application For Sundry Approvals ARCO Alaska, Inc. proposed to add perforations to DS 9-6 at selected intervals within the Sadlerochit Sand of Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating operation. Proposed Perforation Intervals' 9283'-9318 (35') Ref' BHCS 8/8/76 · ":""CFi A :.'a -"a I,.4c ~.... ~. 2:..i-.'. _- i--.~ F"-. p n Box Ar.,ch c, 7 a g e, DATE' j c- r~e Received By HAVE ...-'~ NiCE DAY! i r ..';ia F:.~ r -::_ i ,.-,. ATO-i 5.-29 ]"RANY ):;:, !' £ T R I B U T I 0 ~"4 A:2sks Oi! & Ga: C:,n;. ARCO A:.Laska, Ir, c. F' iq Rr, x i C')0.~.60- · ~ -- ~ _ -- ~- ~. ~-~ ~. Anchorage-, ALaska DATE' May 30, i986 '~-'-' i-86 -' '-== '~ ~ 6-86 ,,.7; ~ -" .-:' ~'~;-- , E.-7: ~ ,~ -,'A- P;/; -- . -t. 3:-3~ 4-2~-86 3-34 4-' ~ 6-86 ~4-5 4-24-E',6 -,-'~-'~, 6 4-' ? 7-' C 6 ~ ?-~ 2;, 4-27-:-'6~ cc_--, "i-26-86 o-6 '~ - '-': '--' 86 · '"T -'-"'l i-iO = --, o --'i ~ -i 3 =.._,:::._o, ~'i 4-i i 4-'.:"-8~' . . ,.' --_* -t. -~ 7_=. 4_.-.,-z_o ~: ':7fat c ,=-~ -.-~ .~.... £~'at c £'!'a t c :"7' ,..-3 : I-- .... . '-"* .i- -. .:. ,..:, : i C L:'~-.~ .<-: ± a Sta+. Jo: Ora ._ ~-7i'.a f i c bra {~4- -* ' C':- --. -.-,._:it IC ~_:: --, "--:*,. a 'l:,. ic g':-a F i ow i 2±a± L.? ~,' .a 'i' i ,- "- '- .~. "-'* '"* ;'- G'.,-~ d Jar.,± d ie'nt ,:J i c::t d i -._='n t d d i e;-,. ~ d i sc-:± d w. d i e':-., t. ad d d i e','-., ± d C.: <': ~Y..' '.': 0 -. L.: a ill C C; r.~.. a ~ 'l C ~"~._ i' ,_- a h'! C ,'_') L-.] ..-'.~ .,':l C C, C: .£ iii C..'::) :7..a ~!: ,: I_-.: .a ffJ C 0 Ca mc o C8 iiic o C8 flic o Ca mc o f-. ,_-.a ¢!iC © r_'.', aiu C 0 C ~ ~j'., c 0 C a m c o i~a i'l'~ C 0 sign a'nd r::,tu';'n fha: a+ta, ch~-~ c o _,. ~u _c:py as ':."ec~_ F-"~ .+," da~'a, · -'-_.aT :_ ATO- ~- 52'_? TRAN~ $S6307 ~ss~, Inc. Post Office Box 360 Anchorage, At ~ 99510 Telephone 907 ~./7 5637 December ll, 1985 Reference: ARCO Cased Hole Finals DS 9-2 12-20-85 Prod Prof/Fluid ID~Spinner Run 1 5" Camco DS 9-5 12-20-85 Spinner/Fluid ID Run 1 5" Camco 9-6 11-20-85 Spinner/Fluid Id Run i 5" Camco 9-21 12-22-85 Spinner/Fluid Id/GR Run 2 5" Camco DS 9-13 1!-21-85 Prod Prof/Fluid Id~Spinner Run 2 5" Camco Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans # 509 DISTRIBUTION Chevron Bxp2oration Services Ex~ension Bxploration Exxon F~ar a 'Ja o n S=ate of Alaska Texaco ARCO ALas'ka F'.O. Box Anchorage, ALaska 995i0 DATE: November i4, t985 REFERENCE: ARCO Cased HoLe FinaLs DS 9.-6 9-2-85 F'erfora~ing Record R un t 5 ' Sc h Please .s'ign and HAVE A NICE KeLt. y Mc:Far Land' ATO- ~ 429F re'.~urn the a¢¢ached copy as receip¢ of data~ 'I'RAN$. ~436 DISTRIBUI'ION Chevron D & M Expl. oration Services E."xt'en~'ion ExpLor~at'ion Ex xon M a r a t' h o n Mob i [ Mob i L E & P F"hi I. Lip F'r udhoe Bay We [ L R & D ~o~;~o Texaco F'i Les ARCO Alaska, Inc..- Post Office B 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: November 4, 1985 R~ference: ARCO Pressure Reperts 9-6 Static 10-3-85 Otis 9-27 Static 10-4-85 Otis Please sign as receipt of data. Receivad by Pam Lambert ATO 1429C Trans 398 Anchorage Chevron D&M Expl' Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State of Alaska Tsxa co ARCO Alesk&. Inc. is a Sul3siOiary of AtlentiCRi¢l'ttielCICOml)ifly ARCO Alaska, Inc. Prudhoe Bay E~,=,neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 11, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 1-15 Permit No. 78-7 DS 9-4 Permit No. 76-40 DS 9-5 Permit No. 76-47 DS 9-6 Permit No. 76-48 Enclosed are the Well Completion Reports detailing work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS:JEB:vah Attachment CC: SOHIO Alaska Petroleum Co. File Pi(DS 1-15)W1-3 PI(DS 9-4)W1-3 Pi(DS 9-5)W1-3 P1 (DS 9-6)W1-3 RECEIVED A/as~a Oil & Gas Cons. CoF, IiTliSSlOl't Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany ~ ' ,~ STATE OF ALASKA -, ALASKAo AND GAS CONSERVATION C£- ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL []XX GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-48 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20216 4. Location of well at surface 9. Unit or Lease Name 639' N & 797' W of SE cr Sec. 2, TiON, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1704' N & 1287' E of SW cr Sec. 1, TiON, R15E, UM DS 9-6 At Total Depth 11. Field and Pool 1723' N & 1359' E of SW cr Sec. 1~ T10N~ R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool 54' R~I ADL 28327 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No. of Completions 12. Date Spudded 07~02~76 08~05~76 08/11/76 (Perf'd 5-08q77)~ N/A feet MaE I $in~le I 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth whereSSSV set I 21. Thickness of P~rmafrost 9655' MD 9158' TVD 9565' MI) 9069' TVD YES E~ NO [] I 2219 feet MD I 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR; CBL/VDL; GR/CCL; FDC/CNL/GR/CAL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# Vetco H-LO Rur~= 7R'B~I T'~ Rg" 295 SX 13-3/8" 72# Butt MN-gO S.r~n= ~7]g' 17%" ~0~ sx Arctic Set cmt 9-5/$" 47# Butt MN-80 & S11T"~mC'_= ggqA' ~_?~" !00~ SX Class Gcmt; S00-95 7" liner 8998' 96&8' 9_%0 ~X Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) '9204'-9212' MD (1 shot/2ft) *added on 9-03-85 5~" 8~:29' 8290' '9218'-9283' MD (1 shot/2ft) 9327'-9342' MD 4SPF 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9360'-9373' MD 4SPF **re-perf'd on 9-03-85 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9384'-9394' MD 4SPF w/6SPF N/A 9425'-9452' MD 4SPF 9472'-9511' MD 4SPF TVD of perfs: *'9475'-q~1~' MD n~ 87!8'-9024' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) July 1977 Flo~i~ 8 Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 9-06-7 4.1 TEST PERIOD ~ ],Rq~.c 1 ~q5 ] 0 35° o,~,. Flow Tubing Casing Pressure CALCULATED j~ OIL-BBL GAS-IV]CF WATER-BBL OIL GRAVITY-APl (corr) Press. 1124 -- 24-HOUR RATE 9916 8167 0 27° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. /ilaska 0il & Gas c;,~,, -, Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. "' 30. GEOLOGIC MARKERS FORMATION TESTS · NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE -VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 9201' 8711' Base Sadlerochit 9533' 9038 ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Title Reg. Oper. Engr. Oate INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: if no cores taken, indicate "none". Fc)rm I ARCO Alaska, Inc ~ Post Office Box J60 Anchorage, Alaska 99510 Telephone 907 276 1215 October 2, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-4 DS 9-5 DS 9-6 DS 9-18 Permit No. 76-40 Permit No. 76-47 Permit No. 76-48 Permit No. 77-39 Enclosed are the "Subsequent" Sundry Notices detailing work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/dp Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-4)Wl-3 P1 (DS 9-5)W1-3 P1 (DS 9-6)W1-3 PI(DS 9-18)Wl-3 RECEIVED oc'ro ? Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRIchfleldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CON, MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell Surface: 639' N & 797' W of SE cr Sec. 2, T10N, R15E, UM Producing Interval: 1704' N & 1287' E of SW cr Sec. 1, T10N, R15E, UM Total Depth: 1723' N & 1359' E of SW cr Sec. 1, T10N, R15E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 7. Permit No. 76-48 8. APl Number 5O- 029-20216 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS; 9-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating Operation on 9-2-85. RU perforating unit and pressure tested equipment. RIH w/gun 91 to shoot 9495-9515' MD (6SPF). Shut in well, POOH, all shots fired. RIH w/gun #2 to shoot 9475-9495' MD (6SPF). Shut in well, POOH, all shots fired. RIH w/gun 93 to shoot 9256-9283' MD (1 shot/4 ft). Shut in well, POOH, all shots fired. RIH w/gun #4 to shoot 9232-9255' MD (1 shot/4 ft). Shut in well, POOH, all shots fired. RIH w/gun ~5 to shoot 9218-9232' MD (1 shot/4 ft); pulled up and shot 9204-9212' MD (1 shot/4 ft). Shut in well, POOH, all shots fired. Secured well, RD. Ref: BHCS 8-2-76 RECEIVED oc i'0 ? 1985 Alaska 0il & Gas Cons. C0mmissi0~ Anchorage 14. I hereby,certify that the fore_going is true and correct to the best of my knowledge. Signed ~_,~7~~2~ Title Regional Operations Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay Engi~ ~ng Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer September 3, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-4 DS 9-5 DS 9-6 DS 9-7 DS 9-26 DS 14-5 Permit NO. 76-40 Permit No. 76-47 Permit NO. 76-48 Permit No. 76-58 Permit No. 84-37 Permit NO. 78-64 Attached are the "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB:cb Attachments cc: Sohio Petroleum File P1 (DS 9-4) W1-3 File P1 (DS 9-5) W1-3 File P1 (DS 9-6) W1-3 File P1 (DS 9-7) Wl-3 File P1 (DS 9-26) Wl-3 File P1 (DS 14-5) Wl-3 STATE8:07 ARCO Alaska, Inc. Is a Subsidiary of AtlanllcRIchfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO~v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL []× OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well 639'N & 797'W of SE cr Sec. 2, T10N, R15E, UM (Producing Interval) 1704'N & 1287'E of SW cr Sec. 1, T10N, R15E, UM (Total Depth) 1723'N & 1359'E of SW cr Sec. 1, T10N, R15E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 12. 7. Permit No. 76-48 8. APl Number 50- 029-20216 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Su~mit in Triplicate) (Submit in Duplicate) Perforate ~ Alter Casing [] Perforations [] Altering Casing [] Stim u late [] Abandon [] Stim u lation [] Aba ndonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate Well 9-6 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator tested to 1.5 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: Ref.: 9207'-9214'MD 9220'-9283'MD ~ 9478'-9517'MD CNL 1-28-80 (BHCS 8-2-76 reads 3 ft shallower than CNL) 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~.~.,~Z~~-~-'~' Title Regional Operations Engineel~ate The space below for Commission use Conditions of Approval, if any: Approved by BY I~HHI[ C. Slllll App_rOVed .Co~:¥ ~,e~ur,ned By Order of COMMISSIONER the Commission Submit "Intentions" in Triplicate Form 10-403 and "Subsequent Reports" in Duplicate Rev. 7-1-80 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: August 14, 1985 Reference' ARCO CH Finals 1-22 CNL 2-lA CNL 2-12 CNL 2-26 CNL 6-8 CNL ~6 -12 CNL '"'~ 6 -20 CNL 6 -23 CNL 7-25 CNL 9-6 Spinner 8-5-85 ~13-33 CNL ! 1-23-84 11-10-84 Run 1 5" Sch 11-7-84 1 5" Sch 11-8-84 1 5" Sch 11-7-84 1 5" Sch 11-12-84 2 5" Sch 11-22-84 3 5" Sch 11-11-84 1 5" Sch 11-11-84 1 5" Sch 11-12-84 1 5" Sch 1 5" Camco ! 5" Sch 'x~14-7 CNL 11-24-84 5 5" Sch '~ 14-33 CNL 11-12-84 1 5" $ch ~ 18-1 CNL 11-8-84 1 5" Sch Please sign as receiPt of data. Received by Pam Lambert ATO 1429C Trans 264 ****THE CORRECT DATE ON THIS LOG IS 11-23-84 NOT 11-23-85'**** Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State of Alaska Tmxaco ARCO Alaska. Inc. Post Office Box 100360 Anchorage. Alaska 99510 Tetel:)none 907 276 1215 Date- June 21, 1985 ' Reference- ARCO Pressure Data 6-7/'$tatic Gradient 4-28-85 Camco 9-6fPBU 5-24/25-85 DA 12-25 PFO 5-22-85 Camco 14- 35 ~BU 5- 31-85 Camco 14-35~Flowing Gradient 5-30/31-85 Camco 15-~ PBU 9-11-84 SS 15-7 JPBU .9-11-84 SS 15-8/tPBU 2-29-84 . SS 15-8 "PBU 10-20-84 SS 15-8 fPBU 10-20-84 SS 17-5 ~PBU 5-29-85 Camco Received by Alaska Pam Lambert ATO 1429C Trans 176 Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R & D Sohio State of Alaska lexaco ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 DATE: JUUE REFERENCE: 13, 1985 ARCO PRESSURE DATA 9-6 PBU 5-25-85 9-25 STAT I C GRADIENT .DA 5-11-85 CAMCO PLEASE SIGN AS RECEIPT OF RECEIVED BY PAM LAMBERT AT0 1429C TRANS 161 DATA. Alaska Oil & G~s Co~s. Commission Anchora9~ Chevron .. D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R & D- Sohio S~a~e of Alaska Texaco ARCO Alaska, Inc. Prudhoe Bay ~.,gineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 15, 1985 Mrl C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-6 Permit No. 76-48 Dear Mr. Chatterton: Attached is an "Intention" Sundry Notice for work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/JEB/mjb Attachments cc: Sohio Alaska Petroleum Company File PI(DS 9-6)W1-3 RECEIVED MAR 1 8 Lqs Alaska Oil A Gas Cons. Commtsslen Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKA O~L AND GAS CONSERVATION COIwMISSlON SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator ARCO Alaska, Inc. COMPLETED WELL OTHER [] 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 639' N & 797' W of SE cr Sec. 2, T10N, R15E, UM (Producing Interval) 1704' N & 1287' E of SW cr Sec. 1, T10N, R15E, UM (Total Depth) 1723' N & 1359' E of SW cr Sec. 1, T10N, R15E; UM 7. Permit No. 76-48 8. APl Number s0- 029-20216 9. Unit or Lease Name Pr~]~ Ray T1~ i t 10. Well Number DS 9-6 1 1. Fie[d and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 2R327 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate DS 9-6 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 9270' - 9310' MD (40') Ref: BHCS 8-03-76 RECEIVED ! 8 1985 0. & Gas Cons. Commission ~,nch0rage 14. I hereby,~ertify that the foregoing is true and correct to the best of my knowledge. Signed ~,~"/~ ¢~, -~~/~/t'~'~ TitleRegional Operations Engineer The space below for Commission use Date Conditions of Approval, if any: Approved by ITIll~fll~t $1tfl[9 Approved Copy P, etu rned By Order of COMMISSIONER the Commission Submit "Intentions" in Triplicate Form 10-403 and "Subsequent Reports" in Duplicate ~,~, 7-1 -R(] ARCO AI. aska, Inc F'.O. Box ~0-0:360 Anchorage, Al. as'ka 99~ ~ (-) DATE' March RI.'-]FEF~ENC E ' t 4, ~ 985 ARCO F'res:~ure Da'l'a 9---2b// { { -¥0-.84 CDBR 9-6 {~/ ~ 0--{ 2--84 CDBR i 4'--Si c~-'">0-84. .,. Pressure _'Rui [d--Ltp t4--St i2'"-3~-84 Homer F'l. ot:~ w/[ is't i6-"4~ "~ .... '~ 8 .... o- 5 I::[owing F'ressure 6: [:radie'n i6-16~ ~ .... t'2-8~ F're.s:ure Fall Off Day .?fate ~:~ 2 .... t3.-.8D :gtat ic: 5'urvey 60 ,:c h ,S' u r v e y s' (: I.'] [;0 I)A F':ease ::::ign and return the attached copy a.: receipt o'[" data. I) ]: .<.,' 'T' R ]: B LJ T ]: 0 N Ch err on D & M Expl. oration Services [:'xt.'ensic',n E'xplora!'ion Exxon Ma r a t h on Mob i I. Hob i 1. E & I::' Phi LLips Prudhoe Bay WeLL R & D $oh i o State of Alaska Texaco ARCO ALa:ka, Inc P ~ 0 ~ B o x I e Anchorage, A oo~-:i A DATE;' Dpcember 2i , i°°'" REFERENCE' ARCO P'r'e_'-~:u. re Dal'a !).,Y, 9-6 iC::-1I-.84 D,.,?., 12--4 1i-26-84 i::,.~ ,:? , i .~..")-8i~ i i--26-84 D 2.'7. i":'-20 4 i-'26 o;, D,. J'?, i 2-'2 i t t -3':"}-'84' D S' 'i2 ""~ - , -.~,.... 'J ,.:.-"i '-'84 ,....~'" ...... J: i2-':'=' i2 i 8/: D. :' ,. i .-.. ''~ - 26 i 2 - S '-o"" 4 D .~ ,:"';', 'i .2:: .... 27 i 2 -' 3 - 84 ;.... :? '~ 2-'29 i 2-" i --84 ~" ,. , ' ........ ' ..... 84 ~...' ':':'I ,.":,-' .2, '~ I i ? Z:',;'., i3-4 'ii-i?--84 D,.,?, 'i 3-6 i i-'i°-... 84 D,.S', 'i3-? i I-'!'7-84 ;'" .2 'i?!; .... !S 'ii-..i9 84 L:',,:. 13 .... 14 i 1-19-84 .D. S~ i 4 "-i 2 i 'i --. ! 6-:-i: 4 D. S' i 6--'i ':::',. --- i - 8 _..T", ,,...'".:', i 6 --. 6 9 ..... 22 o'"' -,.-/' D,:.'., !6--? 3 .... i5: ..... 84 ;~l:~ :/ i 6-' i i "z _....,.; 9 "':: i) ,'.? 'ii: ...... o ---':' -~ - 8,'.~. ¢. .. ...;. .. :.'.. ~.~~ . D.::. i?---'5 3 .... i9-:..,°4 PBil ':-" .',7t:a ~- i c C;.y'ad · '-. 't- a 't' 1'c 6-r.a d 2't'a !' 2 !'a 't' ,? 't' a I' S' i' ,.:.': i' j.?-l: a i: ,? 't' a !' St 1' a 't' ,? '!'a 'i' c C,.r' a d c ,"J;'r a d c [:,. y' a d c 6'r a ci c {l;-':'a d c: 6'.," a cl c 6'.,"a d c (:.:, '.," a d c r-& r a d c O~" a ci c ('.;- '.," a d c Grad c 6 r' a .,'.:I (~ r' a~_:'4 F'DD ,? u'r ;,.,'e'.:., F'BU .?u'r' vey ,? !' a 't' i c: C;. ':' a d J{.' 't' a !- i :::: (; ~" a d F' }'-'-~ U :? u.'r vey S' '~' 4. ' (; y. ,. Si : I C ..'-'i (ii [:: J. ¢..2' a ::: e :.:::' i g '~] a ,,"J cJ r' e 'J' u. y' 'n ± h e a !' '!' a ,':.-. h e d c: .,.'::, ;:, ,..' a :.:.: '...'-' e c: E, A T 0 .... 1 '42 !;:' i'" f) A C a lf~ C: C) C ,.'.-'i I'li C I2 a m c: (::, · ti: 8 :i) ,.':: o C: a m c: ,:.::, C a m ,::: ::::, f'i: a fl': c: c', C a ~':'~ ,::: :::, C a a'~ c: c) C a i'J': C: ::::~ C a m c (::, C a m c: c:, C a i:'~ ,::: ,:::, ¢-... L.. e! fi) C C) C a m ,.':: ,:::, (:.,. 0 'ii...." C: a re., c: (::, C ...'i~ .,'r~ c:: ,:::, C: ..-':'~ m ..':.: ARCO ALaska: I'nc. F'.O, Ii:ox iC) C:,36(-) 995: i (-) r),,: 're..' · I) ,. ~-t , .":. r: C. E' Vi h £-) 'r' 2 ~ : ~ c:, c:~ .a RtEF'ITRENCE · AtTC:O Ca_'-ted t--Ic':l_e F ina l.s (:i ._:i .i. C h E: ;,." 1- C, F.[xp i.c, r81.' io'n ,"-~eFvice~ E ;,' ± ~.'.. 'n s i c: ':", [-[ x F' I. c:: y a !' i o r, E X :~ C, l"i G e ! i: -::. }'i 8 ':-' ,::': I' t': c:, yli ARCO Alaska, Inc. Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 June 6, 1984 Reference: ARCO Cased Hole Finals D.S. 1-26~f 5-17-84 D.S. 2-17~.-~ 5-12-84 D.S. 4-1 5-6-84 D.S. 5-8-- 5-5-84 D.S. 6-18~. 5-22-84 D.S. 9-4`/ 5-7-84 D.S. 9-6/ 5-7-84 D.S. 12-17~' 5~14-84 D.S. 12-23~ 5-16-84 D.S. 13-34 .... 5-17-84 D.S. 13-98 =~'~'~/5-16-84 D.S. 16-13/ 5-20 84 D.S. 17-7/~' 5-25-84 D.S. 17-10 ~' 5-18-84 D.S. 17-10 ~' 5-18-84 D.S. 18-3-~ 5-14-84 Collar/Perf Log Run 1 5" 'GO Collar Log to set Casing Patch Run 1 5" GO CN/MSN/GR CN/MSN/GR CPL/TDT-M w/listing CN/MSN/GR CH CNL CPL/TDT-m w/listing Run 2 5" DA Run 1 5" DA 5" Sch Run 1 5" DA Run 1 5" GO 5" Sch X-Y Caliper Log w/Borehole Volume Run 1 5" GO CPL/TDT-M w/listing CH DIL Collar/Perf Log Collar/Perf Log CET Log CCL/Perf Record Temperature Log 5" Sch . Run 12 5" Sch Run 1 5" GO Run 1 5" GO Run 1 5" Sch Run 1 5" Sch Run 1 5" GO aseand return the attached receipt of data. sign copy as Be PATRIOTIC[ - Hang out your flag on the 14th. Kelly McFarland ATO-1429F Trans. #231 DISTRIBUTION 'Chevron D&M Drillin~ Exp. Services Ext. Exploration Exxon C~tty Harathon · il E & Mob Phillips Prudhoe Bay Well Files R & D Carolyn Smith Sohio State of Alaska ARCO Alaska, Inc. Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 June 6, 1984 Reference: ARCO Magnetic Tapes ~ D.S. 6-4~, 4-23~.84~ .TDT,L~ts ~69195 w/list Run 3 Sch /._:.? D.S~ b-q 4-2-384 TDT~-.Answer..#69196 w/list Run 3 Sch D.S. 9-6f 5-31-84 CH/CNS ~281790 w/list GO e sign and return the attached copy as receipt of data. Be PATRIOTIC! - Hang out your flag on the 14th. Kelly McFarland ATO-1429F Trans. 9235 DISTRIBUTION Chevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon MObil E & P ~: " · ' ~ , .. ~ ..Phillips ' ~'.::: ,',', Prudhoe Bay Well Files R& D Carolyn Smith ARCO Alaska, Inc. Post Offic ~L=~ox 360 Anchorag, laska 99510 Telephone ~d7 277 5637 ApriI 2, 1984 Reference' ARCO Pressure Data D.S. 3-10,~~ 3-18-84 D S 3-15 3-18-84 D.S. 3-18J 3-18-84 D.S. 4-5J 3-17-84 .D.S. 4-16~ 3-9-84 D.S. 9-1 ~-~i'~ 3-18-84 DoS. 9-6 ~'~ 3-18-84 D.S. 9-10 '~' 3-19-84 D.S. 11-2~' 3-17-84 D.S. !3-27f~ 3-4-84 D.S. 13-28~ 3-5-84 ~3-5-84 D.S. 13-29~ 3-12-84 D.S. 14-23~' 3-10-84 D.S. 14-24 ~ 3-10-84 D.S. 14-25 3-11-84 Static Survey Static Survey Static Survey Static Survey PBU : Static Survey Static Survey Static Survey Static Survey Static Survey Static Survey PBU Data Sheet Static Survey Static Survey Static Survey Static Survey Camco Camco Otis Camco Camco Otis Camco Camco Otis DA DA DA Otis Otis Otis ~~Please sign and return the attached copy as receipt of data. HAVE A-HAPPY EASTER! Ke 1 ly McFar land ATO-1429F Trans. # 112 DISTRIBUTION Chevron D & M Dallas Drilling Ext. Exploration Exxon Getty Marathon Mobil Mobil E & P Phillips Prudhoe Bay Well Files R & D Carolyn Smith Sohio State of Alaska Bill Sheffield, Governor ALASKA OIL ~ID GAS ~,O#$£RYATIOR ~,OAf~ISSiO# March 29, 1984 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501-3192 TELEPHONE(907) 279-1433 ADMINISTRATIVE APPROVAL NO. 192.1 Re: The application of ARCO Alaska, Inc. to substitute static bottomhole pressure surveys for transient pressure su.~veys in Prudhoe Bay.:.Unit wells DS 3-10, DS 3-15, DS 3-18, DS 4-1, DS 4-5, DS 4-1'1, DS 9-1, DS 9-6, DS 9-10, DS 16-1 and DS 16-9. Mr. D. F. Scheve Regional Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Dear Mr. Scheve: Application for exceptions to Rule 6 of CO 165 was received March 23, 1984. Exception to CO 165 Rule 6(c) for PBU wells DS 4-5 and DS 9-6 and exception to CO 165 Rule 6(d) was requested for PBU wells DS 3-10, DS 3-15, DS 3-18, DS 4-1, DS 4-11, DS 9-1, DS 9-10, DS 16-1 and DS 16-9. ARCO Alaska, Inc.'s application requests substitution of static bottomhole pressure surveys for the transient surveys required in Rule 6(c) and (d) of CO 165. These static pressure measurements were taken during the scheduled FS2 shutdo~ (March 12-19) after a shut-in of approximately seven days. Pursuant to CO 188 and 192 it has been determined that static bottomhole pressure surveys serve the intent and purpose of Rule 6 of CO 165 and may be substituted for the transient survey. The Alaska Oil and Gas Conservation Commission hereby authorizes substitution of static bottomhole pressure surveys for transient surveys in PBU wells DS 3-10, DS 3-15, DS 3-18, DS 4-1, DS 4-5, DS 4-11, DS 9-1, DS 9-6, DS 9-10, DS 16-1 and DS 16-9 pursuant to Rule 2 of CO 192. ve ry t Lonnie C. Smith Commissioner BY ORDER OF THE COmmISSION lc ARCO Alaska, In Prudhoe B,~y Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 15, 1984 C. V. Chatterton STATE OF ALASKA Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: RE: Prudhoe Bay Unit DS 3-10 Permit No. 79-21 DS 3-15 Permit No. 79-92 DS 3-18 Permit No. 79-103 DS 4-1 Permit No. 70-42 DS 4-5 Permit No. 71-25 DS 4-11 Permit No. 78-6 DS 9-1 Permit No. 75-76 DS 9-6 Permit No. 76-48 DS 9-10 Permit No. 76-82 DS 16-1 Permit No. 80-136 DS 16-9 Permit No. 81-19 Enclosed are Sundry Notices requesting permission to substitute static bottomhole pressure surveys in place of transient pressure test prescribed in Conservation Order 165, Rule 6, on key wells 4-5 and 9-6, and section wells 3-10, 3-15, 3-18, 4-1, 4-11, 9-1, 9-10, 16-1 and 16-9. The static pressure measurements on these eleven wells are part of a package being planned to obtain a baseline reservoir pressure in the FS2 waterflood area prior to the start of water injection. Each well will be shut-in for approximately seven days prior to its survey. We believe that these static pressure surveys will provide a better interpretation of reservoir pressure in the FS2 area than transient pressure surveys and will satisfy the intent of Conservation Order 165, Rules 6(c) and 6(d). If you have any questions concerning this request, please contact Dan Cavin at 263-4268. Very truly yours, D. F. Scheve DFS/DLL/STATE/lmh cc: SOHIO Petroleum Company File Pi(DS)W1-3 ARCO Alaska, tnc Is a Subsldll~r¥ ol AtlantlcRtcnfleJdComo,'~ny STATE OF ALASKA -- ALASK, .)IL AND GAS CONSERVATION £ MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-48 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20216 4. Location of Well 639'N & 797'W of SE cr Sec. 2, T10N, R15E, UM 1704'N & 1287'E of SW cr Sec. 1, T10N, R15E, UM 1723'N & 1359'E of SW cr Sec. 1, T10N, R15E, UM OTHER 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 5. Elevation in feet (indicate KB, DF, etc.) 1 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing E~ Other [~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska Inc. requests permission to run a static bottomhole pressure survey on key well 9-6 in lieu of a pressure transient test for the first half of 1984. Conservation Order 165, Rule 6(c) requires a semi-annual transient survey on key wells A static pressure survey will be run while the well is shut-in during the flow station shutdown (March 12-19) to fulfill the State's requirements. The static pressure survey should provide accurate reservoir pressure data. 14. I hereby certify that th_e foregoing is true and correct to the best of my knowledge. Signed ~~ j~~ Title Rogional E nginoor The space below for Commission use Date Conditions of APproval, if any: Approved by By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, In( Prudhoe Bay ~=ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 19, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-1 Permit No. 75-76 DS 9-12 DS 9-2 Permit No. 76-16 DS 9-13 DS 9-3 Permit No. 76-35 DS 9-14 DS 9-4 Permit No. 76-40 DS 9-15 DS 9-5 Permit No. 76-47 DS 9-16 DS 9-6 Permit No. 76-48 DS 9-17 DS 9-7 Permit No. 76-58 DS 9-18 DS 9-8 Permit No~ 76-70 DS 9-19 DS 9-11 Permit No. 76-84 DS 9-20 Permit No. 77-7 Permit No. 77-8 Permit No. 77-25 Permit No. 77-36 Permit No. 77-37 Permit No. 77-38 Permit No. 77-39 Permit No. 77-40 Permit No. 77-41 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JCD/lmh Attachments cc: Sohio Petroleum File PI(DS as above)W1-3 ARCO Alaska, Inc. is a Subsidiary of AflantlcRIchfteldCompany STATE OF ALASKA '- ALASK .)IL AND GAS CONSERVATION L..~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL [] OTHER [] 7. Permit No. 76-48 ~2 Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 , 4. Location of Well 639'N & 797'W of SE cr Sec. 2, T10N, R15E, DM 1704'N & 1287'E of SW cr Sec. 1, T10N, R15E, UM 8. APl Number 50- 029-20216 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 1723'N & 1359'E of SW cr Sec. 1, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) t 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 9-6 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will' be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: Ref: BHCS 8/3/76 ~aska 0ii & Gas Cons. Commiss~n 9202-9210' MD 9292-9312' MD 9516-9528' MD 14. I hereby c~ertify that the foregoing is true and correct to the best of my knowledge. Signed 4,,~'~ ~-'~~t~' Title Regional F. ngineer The space below for Commission use Date Conditions of Approval, if any: Approved by Approved Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, inc. Post Office B.o~x~ 360 /::nchorage. ka 99510 Telephone 90,' 277 5637 November 30; 1983 Reference: Arco Pressure Data D,S, 1-25 10-12-83 D.S. 3-11 .... · 11-2-83 D,S, 4-15 '/ 10-19-83 10-19-83 D,.S, 9-6 J' 10-13-83 Static Survey Static Survey Pressure Build-up Pressure Build-up Data Sheet Pressure Build-up Static Survey Camco Camco Camco Camco Camco se sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans. # 617 chevron Dallas Drilling [ExxOn [Getty Marathon ['Mobil D I ST RI BUTI ON t~ ...-'~ ol~ .~ C'~hi!!ips' f. 7P'~%dhoe Bay ~R & D Caroline Smith ~' Sohio ['~State of Alaska ARCO Alaska, Inc. Post Office Bo,, 360 Anchorage. Alaska 99510 Telephone 907 277 5637 May 26, 1983 Reference: Arco Pressure Data D.S. 7-6/ 4-9-83 Static D.S. 9-6 ~..: 4-17-83 Pressur 4-17-83 Pressur D.$. 14-6 ': 4-3-83 Pressur 4-3-83 Pressur D.S. 14-11/ 3-24-83 Pressur D.S. 14-17 j 3-27-83 Pressur D.S. 14-21~J 3-25-83 Pressure Build-up D.S. 15-3 / 5-6-83 Static Survey Survey DA e Build-up Camco e Build-up Survey Report e Build-up DA e Build-up Survey Report e Gradient Survey Otis e Build-up Sch Sch DA Please sign and return the attached copy as receipt of data. Kelly McFarland AFA-403 Trans. # 351 DISTRIBUTION' NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOB I L GETTY D&M STATE OF ALASKA DAL LAS CAROLINE SMITR'¢' ,, POSl Olllce ~o), Anchorage. Alaska 99510 Telephone 90' 77 5637 January 3, 1983 RE' ARCO Pressure Surveys D.S. 16-14 12-16-82 Static Survey Camco D.S. 9-6 11-28-82 Pressure Build-up Survey Camco D.S. 9-1 11-17-82 pressure Build-up Survey Gearhart D.S. 11-7 12-05-82 Pressure Build-up Survey Camco D.S. 17-9 11-19-82~ Static Survey Camco .D.S. 4-6 11-19-82 Pressure Build-up Survey Gearhart .. ~lease sign and return the attached copy as receipt of data. Becky Benedi ct AFA-403 Trans. #008 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS AI~CO AII$1~I Inc ~$ a Sub$1O,ar¥ r~f Allanl~cRichfleldComl~.~ ARcc) Alaska, Inc. Post Office P 360 Anchorage, A .... ka 99510 Telephone 907 277 5637 April 15, 1982 Reference: ARCO PRESSURE DATA D.S.4-11 3/27/82 D.S.4-14 3/28/82 D.S.14-3 3/14/82 D.S.9-6 3/5/82 D.S.12-3 3/5/82 D.S.13-1 3/13/82 Pressure Survey Pressure Survey II II II II II II II II. /~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 102 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO ~RATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA ARCO A1351,.~ :n4 ,s ..i s.JC';,:J, :ry of ~.'lanl.cH,chf~c'COO:'npany ARCO Alaska, Inc. Post Office Be-- 360 Anchorage. A .a 99510 Telephone 907 277 5637 February 3, 1982 Reference: ARCO CASED HOLE FINALS D.S.3-3'~/ 12/17/81 CNL Run - D.S~9-1c~ .... 12/16/81 CNL Run 2 D.S.9-4b/ 12/14/81 CNL Run 4 D.S.9-5~/ 12/13/81 CNL Run 4 D.S~9-6 ~//12/9/81 T'emp Log Run 1 D.So9-6p/ 12/11/81 EPL Run 1 DoS.13-8~ 11/4/81 CNL Run 1 D.S.11-3 ~ 12/14/81 Collar Locator for Gyro DOS.11-3 / 12/5/81 CCL & Perf Record Run 1 D.S.12-7A~/12/14/81 CBL/VD Run 1 D.S.13-10~12/12/81 CBL/VD Run 1 1! 5~' 5" 2~ Run 2 5,~ 5~ /Pleasesign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #929 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO CEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Alas~.a. Inc. is a ~uL~d*ar¥ O! ,~Ilar~hcR~Cht~e~dComp.~fl¥ ARCO Alaska, Inc. Post Olfice Anchorage, A .~ 99510 Telephone 907 277 5637 January 21, 1982 Reference: ARCO PRESSURE DATA D.'S.9-3 11./20/81 D.S.3-'4 11/2OI81 D.S.17-6 11/15/81 D.S.3-2 11/19/81 D.S.17-1 11/15/81 D.S.9-1 11/21/81 D.S.16-16 11/15/81 D.S.16-1 ' 11/14/81 D.S.4-7 12/2/81 p.s.9-8 11/15181 p.s.16-11 11/14/81 DOS.9-5 11/22/81 D.S.9-15 11/24/81 D.S.4-6 11/25/81 ~.S.9-6 11/16/81 D.S.3-18 11/19/81 P.S.9-4 11/21/81 9.S.9-12 11/20/81 P.S.9-10 11/20/81 D.S.3-6 11/18/81 D.S.3-7 11/18/81 Pressure Surve'y 1I I! II !! 11 11 !1 11 I1 11 II II D.S.9-6' 12/9/81 D.S.9-6 1/1/81 D.S.9-17 12/10/81 D.S.9-6 12/23/81 DISTRIBUTION ~e'~Se sign and ~return the attachedNORTH GEOLOGY copy as receipt of data. Mary F. Kellis North Engineering R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON Transmittal #902 ~--' D ,-S~,-cJ..,,,A._ 11/23/81 D.S.4-1 ~2/2/81 D.S. 12-9 1/4/82 z).s. 12-10 1/3/82 D.S. 12-12 1/2/82 D.S.12-11 1/2/82 D.S.16-9 1/8/82 Pressure Survey II II II II I! !1 II II I1 II I1 II II I! II 11 II I1 II 11 I! II D&M GEOLOGY STATE OF ALASKA ARCO Alas~.a. in,'. is a ~i~,~l~,ary O! AIl,~nHcRichHe~dCompany ARCO Oil and Gas Company North Alaska ~'~-'~tric[ Post Off;ce 6 . 350 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 19, 3981 Reference: ARCO PRESSURE DATA D.So2-14 10-14-81 D.S.9-1 10-22-81 D.S.9-6 10-9/10-81 Pressure Survey Pressure Survey PreSsure Survey Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal ~761 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON~ GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Oil and Gas Company ~S a Diws~.n O! Alla,~hcRichf,eldCompany ARCO Oil and Gas.-C,,~ompany North Alas, .)is~Fict Post Office ~ox ,360 Ar~chorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Opera~ions Engineer March 19, 1981 Reference: ARCO PRESSURE DATA D..S.3-4 2-7/8-81 Pressure Survey D.S.4-7 3/11/81 " " D.S.9-'6 ....... ~\ 2-25/26-81 " " D.S.9-12 2-15/16-81 " " Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #130 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY $IATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Oil and Gas Company is a Division of AtlanlicRichf~eldCompany ARCO Oil and Gas Company North Aiar~-~ District Post Office . ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 4, 1981 Reference: ARCO Magnetic Tapes & Li~tings D.S.9-6 2/10/81 Tape # SP 8900-9550 Dresser Atlas ;lease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #109 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG, MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL 6ETTY .' ." ~'/~ ~VEJ~ PHILLIPS ,~ ~-~'~///2_ SOHIO MARATHON ~aska 0i~ & ~Co,us. Commission ,uorage CHEVRON ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany ARCO Oil and Gas mpany North Alaska .~istrict Post Otlice Box 360 Anchorage, Alaska 99510 Telephone 907 277 3637 Jerry A. Rochon District Operations Engineer September 12, 19~0 ~f~e~~ Pressue Surveys Pressure Build-Up Pressure Build-Up Pressure Build-Up Pressure Build-Up (Corrected Copy) ~Please sign and return the attached copy as receipt of data M.F. Kellis North Engineering TRANSMITTAL# 589 DISTRIBUTION North Geology Exxon R & D Mobi 1 Drilling Getty Eng. Manager Phillips D & M Sohio Geology Marathon State of Alaska Chevron AflCO Oil and Gas Comp.any ~s a ~,~v~s,on ol All.~nhc~chl~e~dCompan¥ ARCO Oil ~"id Gas Company Post Ollicc .x SGO Anchoraee. ~lask~ '39510 Teieohcne 907 277 5537 August 8, 1980 Reference- ARCO Pressure Surveys ! ~~Df E~.S. 3-7'J'7/9/80 Pressure Build-up S 3-8~'' 7/9/80 " Build-up S 3-17-' 6/30/80 " Static ~: S 3-18 ' 7/2/80 " Static S 9-1 ~''' 4/28/80 " Build-up ~_/,/.~:,_ D.S. 9-3t .... 5/3/80 " " D's .9-6~' 2/2o/8o " " $ 9-15,. 5/5/8o " " S 14-7', 5/4-5/80 Pressure Build-up .~~ease sign and return the attached c of data. opy as receipt c-d !ix!r:. t)i 1 i I · I r:L,',f r.':.c -~ .? .. K. J. Sahlstrom North Engineering TRANSMITTAL #514 DISTRIBLq'ION North Geology fL~x o n R f, P }.lobi 1 Drill. in,, Getty En~. Manager Pt~:i_l 1 J_ps D C, ~I Sohio Geology ~.Ial-a t hon State of ~aska G~c~Ton Ai:.CO C, il and C, 35 Comp~lny ,s ~ D~ws~on Of ?,l!,~rtl,c~ch!:"l.JComp.~,~t ARCO Oil and Ga 'ompany Anchor~:r~e. ,-i!as ka Te~eohoc, e 907 277 3637 May 13, 1980 Reference' ARCO Pressure Surveys /~D.S. 1-~.2 3/29-30/80 Pressure Buildup D.S. 1-6 3/25-26/80 " " D.S. 1-10 3/22-23/80 " " D.S. 3-2 4/7/80 " " D.S. 3-6 3/18/80 " " D.S. 3-9 4/6/80 " D.S. 6-4 3/22-23/80 " " D.S. 6-8 3/25-26/80 " " ~.S. 9-6 3/7-8/80 Pressure Buildup / P*/ Ptease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineerin6 TRANSMITTAL #308 DIS'i'RIBh~'ION North Geology ['kxon R [, P Mobil Drillin~t Getty En~l. Hanager Ph i 11 il)s D ,.5 H Sohio 6eol ogy ~.larn t hon State of ~'~aska O~e~on Al',,,s k4 t,,,~ ~t rict Post Ollice ~. 360 Anct~orage. , .ka 99510 Telephone 907 277 5637 April 24, 1980 Reference' D.S. 1-1 · D.S. 2-8 D.S. 3-16 ~~~-X2- 6 t/ Please sign of data. K. J. Sahlstrom. North Engineering ARCO Cased,Hole Logs 3/2s/8o CN " ' Run 3/21/80 CCL/Perf Run 3 .3/25/80 CNL ~ Run 1 3/22/80 CNL '. Run 1 3/1/80' Spectralog 1/29/80 ,Col. lar Run 2 and ret'urn:'the attached ; .: Run 1 copy as 5" (same lo§) receip~ TRANSMITTAL #265 DISTRIBUTION North Geology E~on R & D ,~ ~ Mobil Drilling ~, Getty Eng. ~knager Phillips D & M '/i Sohio CeoloE), , , State of Alaska · . Marathon Chewon r · ,\!arch 18, Reference' 2d(CO Na'gnetic Tapes D.S. 2-5 1/!7/77 l'ape !t60221 I.).S. ,1-6 ii/10/78 ~r~,,},~ ~/60235 ~/, ~. .~,~ ~ IP60240 D. Si-~19 1/27/80 Tape //6024-2 /Please and return the attached as receipt si~N. of data. K. J. Sahlstrom North N!n~ineerin8 DISTRISt.{'iON North ~'illinS Eng. Hanaser Ceolo~)' State o~ ~Uaska RXXO~ ~Iobil Getty Phillips Sohio ~!arathon,. Cho\iop, ARCO Oil and Ga' q, ompany A.; ,~ . '- q ,' '' ., ,,. ,. '; i" ) 7~ ' . February 26, 1980 ! Reference' -Enclosed are Cased Hole Logs for the fo ]_ l ow:in~ wells' '~~:7 1/25/80 " ~m I 5" D.S. 9-9 1/26/80 " ~n 5 5" D.S. 9-19 1/27/80 CNL ~n 2 5" ~-'"~lease si~n and return the attached cop), as receJ.pt data. K. g. Sahlstrom North Engineering TZ&NSMI TTAL # 122 DISTRIB[~ION North Geolooay Drilling Eng. M~nager Geolo~a7 State o_F /klaska Mobil Getty Phillips Sohio ~.larathon Cttcvron November ].3, 197.{) Reference' FItF: Enclosed are Pressure Surveys for the following ARCO wells: ~~---~_~'~m.. 10/28/79 Gearhart-C~ven D.S. 4,~10 10/30/79 "' ' " ease sign and return the attached copy as receipt of data. K, J. Sahlstrom North Engineering T~L&NSMITTAL # 472 r~)- ) -.- T DIS1 klL[JI l ON North Geology Dri 11 ing ]ling. Manager State of Alaska ]Xxon 3!obil Cetty Sohio t~hi].] Ch ev .ron ARCO Oil and Gas Company Alaska Di~'ct Post Offic~ 3ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 SAMPLE TRANSMITTAL SHIPPED TO- State of Alaska Division of Oil &.Gas Conservation 300'1 PorCupine Dr. Anchorage, AK 99501 _ Attn: Wm. Van Aten DATE: ~ugust 2~,~_ 1979 OPERATOR: Arco SAMPLES SENT: 9231 - 9369 9370- 9419 9420 .- 9549 9550- 9652 NAME' Drill'site 9-6 NUMBER OF BOXES' 4 in 1 big box SHIPPED BY: · (Paleo Lab Tech) -! t ~"/ /j ' ~PO~ RECEIPT OF THESE SAHP~ PLEASE NOTE ANY DISCREPANCIES AND MAIL A SIGNED COPY OF THIS FORM TO'~/ .. ARCO 0IL ~ GAS CO. P. O. BOX 360 ANCHORAGE, ALASKA 99510 ATTN' DICK BROOKS DATE ARCO Oil and Gas Company is a Division of A!lanticRichfieldCompany Amgust 10, 1979 Reference' Enclosed are BHP Buildup and Flow Profile Surveys/ Pressure Buildup Test Analysis Results for the following ARCO wells- D.S. 9-20 s S 9-12 S 9-15 -, 12/4/78 11/29/78 ]0/22/78 s/13/79 10/20/78 5/16/79 Please sign ~r~ return the attached cop), as receipt of data. Very truly yours, .r~''---) ,,/-~.)- R. A. Bellinger North Engineering CONFER: ~I.F: TtOkN~IITTAL # 261 I3i S'fl~ I I;U'I'] ON No:th geo].ogy State of Alaska D & ~1 ARCO Oil and Gas~-%mpany Nord'~ A~ask~, Jistrict Post Office IBo× 360 Anchora§e, Alaska 99510 Te!ephone 907 277 5637 August 2, 1979 Mr. Hoyle Hamil ton State of Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject' Core Summary, D.S. 9-6 Dear Mr. Hamilton' Enclosed please find the Core Summary for Drill Site 9-6, submitted as Item No. 36 on Form P-7 for the above well. Very truly yours, Sr. Geological Associate RWC- kdm Enclosure A,qO0. Oil ~r~d ~'~-~as Company is a Division of AllanticRichfieldCompany DRILL SITE 9-6 ARCo Oil & Gas Co. Sec. 2, TION, R15E, UM CORE SUMMARY Core No. 1 2 3 4 5 6 7 8 9 Depths 9231 - 9262 9262 - 9293 9293 - 9337 9337 - 9397 9397 - 9415 9415 - 9475 9475 - 9535 9535 - 9595 9595 - 9655 Recovery 3O , 97% 27 , 87% 44 , 100% 60 , 100% 18 , 100% 6O , 100% 6O , 100% 6O , 100% 60 , 100% Lithology Sandstone, Conglomerate Sandstone, Conglomerate Sandstone Sandstone, Siltstone Sandstone, Siltstone Sandstone, Siltstone Sandstone, Siltstone Mudstone, Sandstone Mudstone, Siltstone I',}or;h American t'rodt:cinfl Division . :.~. ~ , ,> ~..: . Anchorage, Alaska 9[~510 Telephone 907 277 ~"'~'~,,~ / July 12, 1979 Reference' Enclosed are Pressure Data Reports for the following ARCO wel is' D S.:C9'6 ,: ~D.S. 3-8 ~.S. 3-7 Hewlett Packard Pressure Data Hewlett Packard Pressure Data Reservoir Pressure & Temp. Data Hewlett Packard Pressure Data 5-22-79 5-22-79 6-19-79 6-19-79 Please sign and return the attached copy as receipt of data. Very truly yours, R. A. BellSnger TIL~uNSMITTAL # 206 I)~ STR[ BUT [ ON North Geology Dri 11 Eng. Nanager Geology State of Alaska Exxon blob i. 1 Gott).' So]~io b'laratl~on Chevron North Alaska Po st O ~ c~,...., A n c h o :',, fi e,'"~, s k a 99510 Te. lephone 907 277 Reference': Enclosed are the following Pressure Buildups' DS 1-4 4/23/79 DS Z-9 4/20/79 DS Z-6 4/18/79 L.("DS 4-10 4/18/79 ~.4)S 4=10 ....... 3/25/79 DS 9261~i' > Z/26/79 D~"~'Z~' 2/28/79 Please sign and return the copy as' receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL #162 DISTRIBUTION North Geology Drilling Eng. Manager ~.~ Geology State of Alaska D & M F~xxon Mobil. Getty Sohio Marathon Phillips Chevron North American Producing Division North A!aska_qistrict Post O[fice 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 3, 1979 Reference: Enclosed is the following Pressure' Survey: DS 9-6 11/29-30/78 CAMCO Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL f/007 DISTRIBUTION · North GCo]_ogy Exxon Drilling Sohio En-g. Hanager Mobil R & D Marathon Geology Phi].li ps State of Alaska Chevron D & M Getty North Alaskx .trier Post Office Box 360 Anct]orage, Alaska 99510 Telephone 907 277 5637 December 1, 1978 State of Alaska Attn: Mr. Hoyle Hamilton 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir' In regards to your request for delinquent reservoir surveilance data, our records indicate the following: - Wells #3-3, 3'4, 3-6, 4-1, 4-6 4-9, 5-15, 5-16, and 9-44 per your dates, indicate that they are Initial Static Surveys where they were shut-in for less than 12 hours and no stabilized flow rates are available. - Copies of surveys for D.S. #9'6 and #1-6 have been sent on ll-28-78~and, should r~-~0ur attention shortly. D.S[ #5-8..~as. sent out earlier this year and a copy will b~"~t with this letter for your information. If further information is needed, please do not hesitate to request it from us. Very truly yours, 2~. A. Aochoa District Engineer ral:JR HKVP November28, 1978 Reference: Enclosed are copies of the following data: Transient Pressure Surveys: ,/D.S. #1-2 9-22-78 Go Wireline ,,,. D,S, #1-5 9-24-78 Go Wireline v"D.S. #1-6 9/26-27/78 Camco ,/D.S, #1-10 9/28-29/78 Camco ~-'D.S. #2-2 9/8-8/78 Camco v"D.s. #2-4 9/6-7/78 Camco '/D.S. #2-5 9/].-2/78 Camco w"D.S. #2-6 9/3-5/78 Camco ~..-'D.S. #2-9 9/11-12/78 Camco ~,,'"'D.S. #9-1 . 10-10-78 Go Wireline ~.D.S. #9,6 ; 9-9-78 Go Wireline HKVP Please sign and return attached copy of enclosed transmittal as receipt of data. Very truly yours, ? ,9 / ,/~." 1 '~"; ~ R. A. Logue North OperarSons Transmittal # 574 ..... .~ [ !.J Atlantic~ic*afieldCompany North American Producing Division North Alask~-~'~'istrict Post Office ~. .360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton. State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-1 Permit No. 75-76 DS 9-2 Permit No. 76-16 DS 9-3 Permit No. 76-35 DS 9-4 'Permit No. 76-40  Permit No. 76-47 Permit No. 76-48 Permit No. 76-58 DS 9-8 Permit No. 76-70 DS 9-9 Permit No. 76-76 DS 9-10 Permit No. 76-82 Dear Sir: Enclosed please find a Completion Report for the above- mentioned wells. Very truly yours, Frank M. Brown District I)rill±ng Eng±neer FMB:lr Attachments Form P 7 SUBMIT IN L ,E* STATE OF ALASKA ~ ....... ~h,,r m- st ruct i~Bs OIL AND GAS CONSERVATION COMMITTEE II I I WELl_ cOMpLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: Oil, ~ ~r} OAS W E LL~._J 1~,' ELL DRY b. TYPE OF COMPLETION: WELL L__l ovg~ ~N BACK NAME OF OPERATOR Atlant±c Richfield Company , 3. ADDRESS OF OPERATOR Other 5. APl NIJI~tE.1LICAL CODE 50-029-202.16 6. LEASE DESIGNATION A.ND SERIAL NO. APL 28327 7, IF INDIA_N, A.LLOTTEE ()It TRIBE NA~,IE GAS--NICF. 8167 Reini ected 32. LIST OF ATTACHMENTS Other _ Peri-orate& ........ s. UNiT,FAilJVI Olt LEDkSE NAME Prudhoe Bay Unit 9. WELL NO. DS 9-6 (13-1-10-15) 10. FIELD AND POOL, O1;t wmat~.ddhoe Pool ' ---- CABI.E TOOl,bl NOne, 23. WAS I).t{ECTIONAL AMOUNT PULLED P.O. Box 360 Anchpra. ge~ Alaska 99510 4. LOC^rK, X OF WELL (Report location clearly and in accordance with any State requirements)' Prudhoe Day Fi el d:0i 1 ~t~,~ 639'N a 797'W of SE cr Sec 2, T10N-R15E, ~ / At top prod. interval reported below 1704'N a 1287'E of SW cr Sec 1, T10N-R15E, ~ At totaldep~ LSec 1723'N ~ 1359'E of S'.N er See 1, T10N-R~SE~ ~ 7-~-7~ 8-5-76 ! 8r11-76 $-8-77) 5~'KB ~ SSngle 1 9655'~ 9158[ TVD ] 9565'~, 9069'TVD [ ,O~A,~' ~00~.~ All ~, PRODUCING !N~RVAL(S), OF ~.IS CO~P~TION--TO,P, BOSOM, NAME (D AND D)* , SU I:,V~iY MADE 9201'D, 8711'TVD Top Sadlerochit 9533'MD, 9038'TVD Bottom Sadlerochit I Yes 24, TYPE ELECTRIC AND OTH~ LOG~ RUN DIL/SP/BHC/GR, qBL/VDL, GR/CCL, FDC/CNL/GR/Caliper "'~." ~ CASING RECORD (Report all strings set in w~ll) C~S~G SIZE WEiGhT, ~B/FT. ~ . . , ~ 20" 194#-Vetco 40 [78,_. b91. pd. 32" . 295 sx . ]3.3/g" [72#-Butt ~-80 I g71fl'~ 17-1/2"~ 5500 sx Arcticset Cmt 9-578" ~47#-Butt ~ ~-80~S 881{' , 12-1/4"~ 1000 sx Class "G" .,. Is°°-O 1 ........ 26 LINEX P~CO~ ~ 27. TUBING ttECOr:~J SIZ~ TOP (2vlD) } EOTTOA'I (fiD> ]SACKS CEMENT* SCiiE~ f~SD) t SIZE 28. PErFORATiONS OP~ TO P~ODUC~O~ (h~gcrval, Size ~hd number) ' 9327 '-9342'. ~).,.~"'"'~, ~= x'~r ~x'~'~v_~ (=m A~,~.o~'a~,~ ~. 5 9360'--9373' ~ N/A " , 9384'-9394' ~' - f "AUG 2 9425 ' -9452 ' ' 9472 ' -9511,' w/4 shots per ~t. , .. D~[yisk. i] ~ ('i;i ami n'-,,.., . 30, PRODUCTION ~ ,, DA2%:'~'~i[GD~,~TION J P~ODUCTION MEIf{OD (Fl .... iiog, gas lifL p .... ping--size and type of pump, [~',;~T~i.: ffI'ATUS IProducing or ~July ' ' ~'~"~';~") ' ) ~ Flowing [ ~roauclng 1977 ~t-tZ..DF-X[~%~ ...... ~6URS TESTD [CI-tOIiE SiZE {PP. OD'N FOR OI~EEL. C~Y~iV1CF. [ : 1 ~ /TEST PEiUOD ...... -a-77 a.m 135%0/64I ]1693.9 FLOW, ~YBING. [CASI~¢G PRESSURE ICALC~T~ OI~BBL. , 1124 I 0 I - > I 9916 " ~'1. DISPOSITION OF GAS (~0la, BS6~ ~0~ ~6~, vent~A etc.) ' I)EPTIt SIqT (MD) ~ t>ACi-21q[~ SET (MD) " 8429' /I 82'90' I £1A S-O I L 1395.1 I 0 I 824 W/iTEl--BBL. ~ OIL GRAVITY-AP1 (COR~.) [ 0 I 27.0 I TEST WITNESSED BY 33. I hereby certify that the foregoing and attached information is complete and correct as determined frum all-avMlable rec,rd.~ *(See Instructions and Spaces lot Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lan:Js and leases in Alaska. item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in c, ther spaces on this form anct in any a~tach:~]ents. Items ]0, ~nd 2]:: If this well is completed for separate produclion from more than one interval zone (multiple completior~), so state ~n iten~ 20, and ~n ~te'~ 2? show thc p, cJ~ci~g interval, or ,~tervals, top(~), bottom(s) and name (s) (if any) for only the interval ret~orted in item 30. Submit a separate report (page) on this form, adequately identified, for each addilional ir~le~val to be separately produceJ, show- ing the ad~ditional data pertinent to such interval. Item2~: "Sacks Cement": Attached supplemental records for this well shoulS show the details of any mul- tiple stage cementing and the location of the cementing tool. Item ]~: Submit a separate completion report on this forrn for each interval to be separately produced. (See instruction for items 20 and 22 above). '"~4. SUMMAH. Y OF F'ORMAT ON TF_,STS INt'I.UI)IN(; INq'I,]I{VAL TF,,qTED ~ttE~qUnE DATA ~ ~COV~}{I~S OF OIL. GAS. WATEI1 AND MUD NAM~ , ~ ~, , ~, , ,,~ Top SadlerochSt 9201~ 8711~ ~ase SadlerochSt 9533~ 9038~ 36. COHE DATA. A'I'I'ACII BRIEP D~CRIPI~ONS OF L1TIIOLOGY. POHOglTY. FRACWR~. APP~NT DiP8 AND I)~'I'ECTEI) SIlOWS OP OIL. G&S OR WAT~. _ _ ., ....... :, ~ n,icRich,!~ldCompany North American Producing Division Alaska Regi~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5S37 June 22, 1978 Reference' F. nclosed are Transient Pressure Surveys for the following wells: · *D.S. #5-11 ~D.S. #3-7 ~ *D.S. #2-1" D.S. #5-8' D.S. #2-9 (Corrected revised data) - Please sign attached copy as receipt of data. Very truly yours, R. A. Logue North Operations Engineering * Indicates key well data Transmittal #366 ii ..m tic Rich iieid Co m pa ny Norlh Ame~ica'n Producing Division No.dhAlask' .... s~.rict Post Office b Ar, ch,o~'age, Al:::ska 92310 Telephone $07 277 55,3'7 Attached are copies of the following reports o.[ Pressure Buildup Test Analysis Results' Transmittal #353 · North Alaska District En~i__neerh~g T RAN S M I T TA L ' To- .. From' · . 'Transmitted herewith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gmr~ma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Com?ensated Formation Density Log Compensated Neutron-Fo~ation Density Compensated Neutron Log Core ~atysis - Inte~al Core' No. Core Descriptioq (SWC) - Inte~al Core Description (~nv.) - Core No. Directional Su'~ey .- ~ro' Single Shot b'~ltishot ~i'tt Stem Test - Test No. 'Pool Induction LaterologFo~ation Density Log Formation D~nsity Log/G~a Ray. Ga~a ~M/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Inte~al Sample Log (A. R. C0.) - i~ Synergetic Log ~D-DIL -- T~-Porosity ' Log Xerox Sepia BL Line Rece5pt Acknq!fledged For: Date' Please return recelpt to' 2SOI1 )~[~chfieicl Company No~ ~aska EngineerJ. ng P. O. Box 360 AnF_bnr~ ~e. A1 nqlm qq ql'rl By' AdanticH~chheldCompany North American Producing Division Alaska Reg' Post Office ~,,x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 13,1978 : Reference: Dear Gentleman: The ~llowing material is being submitted he.with. Please acknowledge receipt by signing a copy of this letter and returning it to this office. D.S. 9-1 D.S. 9-2 D.S. 9-3 D.S. 9 5 D.S. 9-7 D.S. 9-8 D.S. 9-9 D.S. 9-11 D.S. 9-12 Initial Transient P~essure Survey Nov. 14/77 Nov. 27/77 Nov. 24/77 Nov.21/77 Nov.18/77 Dec.18/77 Dec.6/77 Dsc. 10/77 Dec.17/77 Dec.21/77 Initial Static Gradient Pressure Survey D.S. 9-13 Nov.20/77 D.S. 9-14 Nov.18/77 D.S. 9-16 Nov.21/77 Donovan Jackson ~] \ . North_~ Alaska Dist~.s_~..._..t~%t) Engineering. . DRILL SITE #9-6 PERFORATION AND CLEANIIP RECORD May 6- 7, 1977 D.S. #9-6 was drilled to a bottom hole location in the southwest corner, Section 1, T10N, R15E, Prudhoe Bay Field. Depths of interest are: Measured Depth. Subsea Depth Zone Top of Sadlerochit Gas/Oil Contact Perforations (Ref: BHCS/CR of S/3/76) Water/Oil Contact Base of Sadlerochit Junk Left in Hole 9202' 8658' Not Present - 9327-9342' 8781-8795' 9360-9373' 8813-8826' 9384-9394' 8837-8846' 9425-9452' 8877-8904' 9472-9511' 8923-8962' Not Present - 9530' 8981' None Cong -- ~S ~S ~S -- The first gunwas positioned to perforate the interval 9486-9511' M.D. with the choke set at 36/64" initially. Upon firing, the FTP surged to 300 psig and fell back to zero, and the turbine meter rate surged to 2000 BOPD, then began declining. The rate was insufficient for cleanup and the well was SI five minutes later. The second gun (a dual select-fire) was positioned to perforate the interval 9472-9486' M.D. SITPwas 800 psig. The well was opened on 40/64" d~oke and FTPwas zero when the gun was fired. The turbine meter rate surged to 2500 BOPD and then began declining. FTP remained at zero. With the well flowing, the gun was repositioned 'to perforate the interval 9442-9452' M.D. The well was flowing at 0 FTP and 1600 BOPD when the second perforations were nkTde. The turbine meter rate increased to 5600 BOPD and the FTP began increasing gradually. Forty minutes later, CaC12 water and gas surfaced. FTP was 800 psig. The turbine meter pegged at 6000+ BOPD and was bypassed. 2~e well was flowed for an additional one hour 38 minutes and SI after consistent samples indicated the presence of no water. Final FTP was 1060 psig. During this flow 486 barrels of fluid was recovered of which 190 barrels was diesel, 53 barrels was CaC12 water, and 243 barrels was reservoir fluid. A Fluid Density log was run indicating the CaC12 water at 9504' grading to 100% oil at 9490'. The third gun was positioned to perforate the interval 9425-9442' M.D. SITP was 1_390 psig. The well was opened on 44/64" choke and FTP was 1010 psig when the gunwas fired. The FTP increased to 1150 psig in five minutes and the well was SI. The fourth gun (a dual select-fire) was positioned to perforate the interval 9384-9394' M.D. SITP was 1360 psig. The well was opened on 44/64" choke and FTPwas 1170 psig five minutes later when the gun was fired. ]1~e FTP began increasing and the choke was opened to 48/64". With the well flowing, the Drill Site #9-6 Perforation and Cleanup Record Page 2 gunwas repositioned to perforate t]~e interval 9360-9373' M.D. FTP was 1220 psig when the gun was fired and was also 1220 psig five minutes later when the well was SI. The final gun was positioned to perforate the interval 9327-9342' M.eD. SITPwas 1410 psig. The well was opened on 3/4" choke m~d the FTP was 1250 psig when the gun was fired. Five minutes later the pressure had increased to 1280 p.sig and the well was SI. An Amerada pressure bomb was used to determine the 8800'ss static pressure, 4390 psig. The well was flowed on 40/64" at an average rate of 4387 BOPD for 1 hour 48 minutes, resulting in 329 barrels of oil production. ~e initial FTPwas 1290 psig but had increased to 1420 psig just prior to SI with a well- head temperature of 60°F. The Amerada showed a maximum drawdo~ (just prior to SI) of 148 psi, resulting in an approximate PI of 29.6 S~/psi. ~T was 190°F and final SITPwas 1570 psig. The total estimated volumes of oil and gas produced during perforating opera~ tions were 665 barrels of oil and 499 MCF gas. 7/20/77 pi STRIBUTE'I~ ~(~ ST^TE OF ~L~$.~J~k T R A N S M I T T A L DIVISION OF 7Frollt ' ]')ate' June 7, 1977 ' Well Name' J. A..Rochon/9. P,. -, D.S. #9-6 Transmitted herewith are the following for the subjec't well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation DensityLog Compensated Neutron-Formation Density Comper~ated Neutron Log Core Analysis - Interval Core No. Core Description (~C) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Garmna Ray Gamma Ray/CCL Laterolog' Location Plat ~Hcrolaterolog Microlog bMdlog - Interval SmT~ple Log (A.R. C4.) - Interval Synergetic Log TVD-DIL TVD-Porosity Log * Casing Collar Lo~ 5" Xerox Sepia BL Line Receipt Acknowledged For' Date' Please return.receipt to' ic Richfield Company NSr%h Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 # 4 71 AtlanticHicl~l~el(]t;ompany Norlrl /-~1111~[ICdll I"IUUUI~III~I IL./IVlOIUII North Alask~istrict Post Office ,~ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1977 Mr. Hoyl e Hamilton State Of Alaska Department of Natural .Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-3 (31-11-10-15) Permit No. 76-35 Drill Site 9-4 (13- 2-10-15) Permit No. 76-40 Drill Site 9-5 (31- 3-10-15) Permit No. 76-47 ~____~!]! ~13-1_10_15) Permit No. 76-48 ~r9-7 (31- 2-10-15) Permit No. 76-58 Drill Site 9-8 (33-36-11-15) Permit No. 76-70 Drill Site 9-9 (31-2-10-15) Permit No. 76-76 Drill Site 9-10 (11- 6-10-16) Permit No. 76-82 Dear Si'r: Enclosed please find our Sundry Notices of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb Enclosures Fo~m 10-403 Submit "Intentions" in Triplicate REV. 1-10~73 & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL ii OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 5. APl NUMERICAL CODE 50-029-20216 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 3. ADDRESS OF OPERATOR 9. WELL NO. P. O. Box 360, Anchorage, Alaska 99510 Drill Site 9-6 (13-1-10-15) 4. LOCATION OF WELl: At surface 639'N & 797'W of SE cr Sec 2, TION, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB Check Appropriate Box To Indicate Nature of Notice, Re 14. 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field - Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec l, T1ON, R15E, UM 12. PERMIT NO. 76-48 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF [------! FRACTURE TREAT SHOOT OR'ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF FRACTURE TREATMENT SHOOTING OR ACIDIZING (Other) Perfora to REPAI RING WELL ALTERING CASING ABANDONMENT* (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all i~ertlnent details, and give pertinent dates, including estimated date of starting any proposed work. Began..perf operations on 5/4/77. Tstd tree, csg, tbg, & wireline BOPs. Pulled dummy valve. Perf'd intervals 9489' - 9514', 9475' - 9489', 9445' - 9455', 9428' - 9445', 9387' - 9397', 9365' - 9387', 9331' - 9346' w/4 shots per ft. Ran Amerada press bombs. Flowed well 1-3/4 hrs. SI well. Ran & set ball valve @ 2218'. Tstd bal & control lines to 5000 psi OK. Bled press above ball valve to 0 psi, held OK. Released well ot Production Department on 5/8/77. 16. I hereby certify that the foregoing is true and correct T~TLE District Drilling En§ineerDATE, May 16, 1977 (This space for State office use) APPROVED BY. CONDITIONS OF APPROVAL, IF ANY: T IT LE DATE See Instructions On Reverse Side To' ,,'~-;~' !~,,.~1)~'O~ North Alaska District Engineering. 5~%~!~i~G~$ T RAN SM I TTAL o From: J. A. Rochon/D. R. Jack~n Date' May 26, 1977 Well Name' D.S. #9-6 Transmitted herewith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Con~ensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No, Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Ik~al Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gamma Ray/CCL Laterolog Location Plat Microlaterotog Microlog Mudlog - Interval .Sample Log (A.R. Co.) - Interval Synergetic Log TVD-DIL TVD-Porosity Log Fluid Density Xerox Sepia BL Line ea. Receipt Ackmowledged For: Date: Please return receipt to: ./ /.gZ7 At~t/c Richfield Company NotitJa/Alaska Engineering b~nager P. O. Box 360 #399 02~01B STATE of ALASKA DEP~ ~=.~2~ C~ NA%~AL ~SCURCF£ Division of Oil ~,r~.. C~ns ~ation TO, ~ FROM: Petrole~n Inspector DATE : ~-~y 26, 1977 SUBJECT: 19itness R~sts on Subsurface Safety Valve and Surface Control ,9~_~ety Valve Arco DS 9-6, ~. 2, T10N, Pd.5E, 1~4. ~it ~. 76-48 Th_ursday, l:.~y ~, 1977 - I lef~c r~ house at 8:00 ~,I for d~ck in at Wien ~ir-f0~--~-filgll~ ~ ~ Bay at 9:00 ~4. ..Purpc~e of this trip to ~st subsurface s~fety v~lves and surface control s~fety valves. Wien flight 9 was del'_ayed until 10:20 AM. I strived in Prud~ at 11:55 D~. Bern ~3vis picked n~ up and set ~ up in a room at DS-9 camp. At 1:00 ~-~ tests on DS 9-6 ~. T~re was 1350 psi on tubing. The .~LqV was close] and pressure bled above SC~V to 400 psi. I observed ~his for 10 Th~_re was no buildup of pressure. ~he SC~ was of~ and the. SFxqV was closed with 1350 psi ah~e SS~J. Pr~sure above SSSV was bled ~ 750 psi. I observed t/%J~ for 15 m/nut~.s. There was no b~ildup of pres.~are, indicating tb~t both ~ S~qV ~nd S~%~; d~d not leak. ,.>S~! '~s set at 2218 feet. Testing ccncl~ at 1:45 I~4. _/n _~~y.: I witnessed the tests on the s~mu~face safety valve and st~face control safety valve with no leakage. Tests were satisf~t~)ry~. Attach~nt Oil and Gas Conservati Field Inspection Report 1 presented Ke Sec ~" Sati .. (Ye)s () () ( Valve Tests 5. . Wells / - 6 SUbsurface-No. Well'rs ( ) Well Test Data Sati S~J~actory Type InspectiOn Yes~ No Item ( ) BOPE Tests ~ Well Sign ( ) ( ) 15~ ',Casing set @ 2. General Housekeeping (,) ( ) 16. ~t fl~Uid-(..)wt~)mud.(~.) Oil :n( )filled ( ster Hyd. Control Sys.-~sig ( btls., i .~ .... -,:~ ~ . ps~ig~ I Control s ng spool- "oUtl e~:s ( )'~ () 21, Kill Line-( ) CheCk valve · I )', 2.2. ~Choke Flowline ( ) HCR va , , , ) 23. Choke Manif°ld No. ValVs' Is ( ) ( ) 7. Well NoS. ( ) ( ) 8. Hrs. obser ( ) () 9. BS&W , () (.') 10. Gr..'Bbls. · () , , , () ~· ( 24. Chokes-I )Remote( )Pos. gL( )]~./ellhd( )c ' ' ( i (~) 26. Annu'l.ar Preventer, .:~.psig ( ) Final Abandonment.'--(ii'~ '·(]~) Blind Rams, psiO ~.,) 1.1. P&A Ma.r.ker ) ~ 12. Water well-( )capped( )Plugged (.'~)i'~ i]Ii.'"Ii ~.,?~ ( )' ( ) 13. Clean-up ( ) ( ) 30.. Lower Kelly valye psig ?~" ( ) ( ) 14. Pad.'.l.eveled .. ~.a):..( ).. 317 Safety Floor.valves.,.~. )BV .( .~:)D,.a.~']t ...... ~:"'ii"']i:]'''Totai'' ins'pecti'On 'O'bs6~rVati'on~"t'i'ine/~/~~'s''' i~'a'l'"n~m~e'r" lea~S..and/o'r eOUip, failure'~~~' ~']~'~.~:<.Remarks ,~.,S,S',.~ ~...~' _'.~ ~. .... ~'. ...~ _~ 2 ,~ / ~...~~ ' ~'m~~ ~]~,1 ~_~' · /~'~.:~. ~ · '....?~]~..~ .-- ..... . . ,' ....... . . .... · '..." . .~ ~.~.. .. '... ]....: . . . . . "....~.'.. '~.. .' ...']. '.'. . .. ~?.'~. cc: z~m~ ,.~/y~.i_~otify in ] ~ay.s. or when r.eady'.. ~nspected by~~VK~y'~.. Date~'~t'~'7. ,~" ~ ~ ~. ? , ~,~ ~ , ~ ': , . ~ ' : ..... . ~ ~ .' '. · .. ~ ' . ..'..'". , ..'......,.... · .. .... . ...... ' . .. ~ .. ~. ~ ., ~' . ~.. . . . . . . .' ... . .. ~. . .,... . ." -. ~. '" . . , .." . ..,..... ..~, ~' .. :. ....' .. . ~ ...... .' .,.. · .... ~? ........ '~ ~' ~.~. L~.~ '~,~.'.~ ' ..... ]..~ ........ .~.....]-.-...L~ ....... ']~.:] .................... --.~.]~. ' ................ ....~...~ ...'~ ...... ~.. ~...'.'. ..~'...~....~..'.~ ~ . ...,~..~:.. ~. ~.~. ~..?.. ~,,.....~...,~ ~L...'~,..,...... ,, ...'..~ ~'.~ ~'~.~,.....~. ,..'~ . ~. ~<.~,.,.~ ~.......~. .~..~Z..,;~.~. .~..~...~. ...... L.~'.~.~'~.~.]~ _~.~.. ~.]~.~. ~:~.,.~.,~,. ~ .'~...~'....~ ...~ .~...~.~ ~ .~ ~.,~,... ~.~,..,.,~'¥~'~ '~..'. ~ ,: ... ~ ~'.,.~..~.~. '~. State of Alaska Division of Oil & Gas Attn: Mr. John Levorsen 3001 Porcupine Dr. To: Anchorage, AK Atlantic Richfield Company North Alaska District TRANSMITTAL From: R.A. McIntosh - North GeolOgical Date: May 19, 1977 Well Name: Drill Site #9-6 · Transmitted herewith are the following for the subject well: · .Run No. Scale Xerox' Sepia Bi Line BHC Sonic/Caliper Log BHC Sonic/Caliper-Garmna Ray Log BHC Sonic-Gamma Ray Neutron Cement Bond Log Continuous Dipmeter (HPD) Continuous Dipmeter Polliwog Plot Continuous Dipmeter Printout Core Analysis Interval Core No. Core Description (SWC) Inter~al Core Description (Conv) Core No. Directional Log Drill Stem Test- Test No. Dual Induction Laterolog Compensated Formation Density Compensated Neutron Formation Density Gamma Ray-Neutron Microlog Mudlog interval Pr oximity-Microlo g/Calip er Log Sample Log '(ARCO) Interval Sidewall Neutron Porosity Samples (SWC) Interval No Boxes Samples (Cony) Core No. No. Boxes Samples (Dry) Interval 9040' - 9650' No. Boxes 1 box Samples (Wet) Interval No. Boxes Synergetic Log . Return receipt to: Atlantic Richfield Company North Alaska District Date: Attn: District Geologist P.O. Box.360 ~Arlehorage, ~Alaska. 99510 · Processed by: Catherine Worle_y AtlanticRichfieldCompany North Arnerican Producing Division ' Norlh Alast is~ricI Post Office b~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 24, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-1 (13-12-10-15) Permit No. 75-76 Drill Site 9-2 (31-12-10-15) Permit No. 76-16 Drill Site 9-3 (31-11-10-15) Permit No. 76-35 Drill Site 9-4 (13- 2-10-15) Permit No. 76-40  (31- 3-10-15) Permit No. 76-47 (13- 1-10-15) Permit No. 76-48 Drill Site 9-7 (31- 2-10-15) Permit No. 76-58 Drill Site 9-8 (33-36-11-15) Permit No. 76-70 Drill Site 9-9 (31- 2-10-15) Permit No. 76-76 Drill Site 9-10 (11- 6-10-16) Permit No. 76-82 Dear Si r: Enclosed please find a Sundry Notice outlining our plans for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure Form 10-403 .~ Subml t "i ntentions" in Triplicate .~ REV. 1-10-73 & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use ,,APPLICATION FOR PERMIT--" for such proposals.) 15. APl NUMERICAL CODE 50 - 029 - 20216 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME WELL ti OTHER ~ NAME OF OPERATOR 8. UNIT. FARM OR LEASE NAME Atlantic Richfield Company Prudhoe Bay ~ ADDRESS OF OPERATOR 9. WEI~LNO. P. 0. Box 360 Anchorage, Alaska 99510 Drill Site 9-6 (13-1-10-15) 4. LOCATION OF WELL At su trace 639' Sec. N & 797' W of SE Cr. 2, T 10 N, R 15 E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.)' 54' RKB Check Appropriate Box To' Indicate N~:ture of I~otice, Re 14. 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 1, T 10 N, R 15 E, UM 12.- PERMIT NO. 76 - 48 }orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUTq:)FF FRACTURE TREAT SHOOT OR ACIDIZE REPA! R WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS Perforate SUBSEQUENT REPORT OF: WATER SHUT-OFF FRACTURE TREATMENT SHOOTING OR AClDIZING (Other) REPAIRING WELL ALTERING CASING ABANDONMENT* (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE pRoPoSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed wOrk. . Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type. guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. Estimated start date: 26 JUNE 1977 MAR b;vislen of Oil a;'~d 6;J.s Oonserv~i:;o;-~ 16. I hereby certify that the foregoing is true and correct SIGNED ~.~. ~ TITLE District Drill inq. Engineer DATE (This space for State office use) APPROVEDBY ~, C/~~7, ~-~,,~-~ .~-~-~ TITLE Petroleum £n(~ineer CONDITIONS OF APPROVAL, If AN~' - See Instructions On Reverse Side DATE 3"30-77 .... Approved Copy Returned State of Alaska Division of Oil & Gas Attn: Mr. John Levorsen 3001 Porcupine Drive To: Anchorage, Ak Atlantic Richfield Company North Alaska District TP~kNSMITTAL From: R.A. McIntosh - North Geological Date: Oct. 21, 1976 Well Name: Drill Site #9-6 Transmitted herewith are the following for the subject well: Run No. Scale Xerox Sepia Bi Line BHC Sonic/Caliper Log BHC Sonic/Caliper-Gamma Ray Log BHC Sonic-Gamma Ray Neutron Cement Bond Log Continuous Dipmeter (HPD) Continuous Dipmeter Polliwog Plot Continuous Dipmeter Printout Core Analysis Interval Core No. Core Description (SWC) Interval Core Description (Conv) Core No. Directional Log Drill Stem Test - Test No. Dual Induction Laterolog Compensated Formation Density Compensated Neutron Formation Density Gamma Ray-Neutron Microlog Mudlog Interval Proximity-Microlog/Caliper Log Sample Log (ARCO) Interval Sidewall Neutron Porosity Samples (SWC) Interval No. Boxes Samples (Cony) Core No. No. Boxes Samples (Dry) Interval 2740' - 9040' No. Boxes 3 ctns. Samples (Wet) Interval No. BoXes Synergetic Log ~ Receipt acknowledged: ~'~R' f 1 Return receipt to; Atlantic ich ie d Company · North Alaska District Attn: District Geologist · P.O. Box 360 Anchorage, Alaska 99510 Processed by: September 8, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 RE: ~~8 (21-11 l!-14) Dear Si r' Enclosed are the Well Completion Reports along with the Well History and Directional Sur~'ey for each above mentioned well. Very truly yours, C. R. Knowle District Drilling Engineer CRK/jw Enclosures Form P--7 SUBMIT IN ~.~ STATE OF ALASKA s~r~Ict ia n.$ on reverse si,let OIL AND GAS CONSI:RVATION COMMITTEE · ~ i . i i IIIL - - -- i i i ii i iii : .... '~"wELI""'r'COMP'[ETION 'C[R REcoMPLETION REPORT AND LOG* ' ~i~ TYP']~ Of' WELL: "0;[i ' ~ ~ Dr:~' ~--] Other · WELL WELL b. TYPE OF COMPLETION: WELL OVER EN hACK RESVR. Other 2. NA~'IEOF OPERAT0[% Atlantic Richfield Co,mpany 3. ADDRESS OF OPERAT0~[ P. O. Box 360, .Anchoraqe,. AK 99510 ,~. LOC,~T[ON OF ~'ELL (Report location clearly a,~d in accordance wi~h any Sta~e requirements)* ORIGINA[ 5. API NUSIER~CAL CODE 50-029-20216 6. LEASE DESIGNATION .Z~-ND SERLAJ-. NO. ADL 28327 IF INDIA. N, ALLO'I-i~ OR TRIBE NA~M.E 8. UNIT,FA~M[ OR LEASE NAI~IE Prudhoe Bay At surface 639'N & 797'W of SE cr, Sec 2, TION-R15E, UM At top prod, interval reported below 1704'N & 1287'E of SW cr Sec 1., TION-R15E, UM At total depth 1723'N & 1359'E of SW cr Sec. 1., TION-R15E, UM 1-'O~L,~'-~qb POOL, OR '~VILDCAT Prudhoe Bay - Sadlerochit 7-2-76I 8-5- 6 I 8-11-76 I " S 'KB ? ~: =o~ ~T~, ,,m'~ T~D~O.'PL=~. MC= ~ ~ ~' ~'~ ~=~" ""~'~-o ~oo=~ 9655'MD, 9158'TVD 19565'MD, 9069'TVDI ~lng~ I ~:~ ' ~. PRODUCING IN~VAL(S), OF ~S COM~X~--~P, B~ONX, N~E (N~ A~ ~)' 9201'MD, 3711'TVD, Top Sadlerochit 9533' MD, 9038' TVD, Bottom Sadl erochi t Il. SEC., T., R., fyi., (BOTTOM HOLE OBJECTIVE) Sec 1, TION-R15E 12. PEI~MIT N'O. 76-48 i GR, 5q"C)*117. ELEV. CASINGHEAD I INTERVALS DRILLED 'BY' t ....... CABLE TOOLS None . 23. WAS DIRE~YrIONAJ- ~ SURVEY ~IADE I Yes 24. TYPE F~L~C"!rIR~C AND oTI~ LOGS .R~ DIL/SP/BHC/GR,~, C~L/VDL,GR/CCL,- FDC/CNL/GR/Cal iper ........~ ~ ~l ~ ~, - i ii i ' i i i ii i i ii ii i CAS~G R~ (Re~ all strips set in w~ll) 20" I~4~-Vetc~ 40 t78' Pa elev~ 32" 295 sx 13-S/8" 172~ - Butt~N-80 / 27~4' ] ! 17~" . ~550~ sx Arctic~ Cmt 9-5/T,. ~47~ .- Butt~N-80 ~ a814' ..' I~"~lOmm ~ c~a~ ~ oo- 5[ ' I I [PACI{ER (MD) NA NA ..... ,, , , ,, i i i i i iii i Ii ,IlIll. III,II Il PRODUCTION DA'TE FIRST PFCODTJCTIO!q [PI~ODUCTION ME'I HOD (Fl°whxg' gas lif ~' pumpLqg-size and type °£ pump) NA [WELL S'FATUS (Producing or&,~.ut-in) . fiioLms T-~r~:) lc~io-_cm SIZE IP~OD'N FLOW. TUBIN'G ~[?ASI~& PI~.F. SSU't~ ICALCUI-~T~ OIL--BBL. ' GAS--~,ICF. WATEkt--BBL. ' " ' ~ tc ' l OlL GRAVITY-API(COI:~.) I TEST WITN.E.qS~D B~X 32. LIST OF ATTACHMENTS Drilling History and Directional Survey " 33. I here6y certify that/{~e foregof~~' and ~ttached information is comp'l~te"and cbrrect a's 'det'ermined from all-~va{lable rec0~ds __ -_-~ /:..~r- .... ¥ ............. ,' , i .... ' o ~', -:--7 ...... .;-- ;: .. .... _ ..... -=- * ces For Add,t,onal Data on Reverse S~de) '" ' ('//U (See Instructions and Spa " .~ INSTRUCTIONS General: This form is designed for .submitting a complete and correct well completion report end log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used 'as reference (where not otherwise shown)for depth measure- ments given in ether spaces on Ibis form and in any ailachments. Items 20, and 22:: If this well is completed for separate production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the ploJucing intsrval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reporled in item 30. Submit a separate report (page) on this form, adequately identified, for each additional intel val to be seperate!y produced, show- ing the ac~itional data pertinent to such interval. ite, m26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this forrn for each. interval to be separately produc~l. (See instruction for items 20 and 22 above). 34. SUMMAIt¥ O1,' FOI'LMA'~'I()N 'I'E.S'I'.'~ IN('L,UI}IN(]' INT~:IJV~L T~'FEO. I~IJE~qUIIE DATA ~'~COV~:III~ OF OIL GAS. ~5. G~GIC MARK~ WAT~ AND MUD , , NAM~ , , ,, ,,, . . . . Top Sad1 eroch~ ~ 9201i 8711' Base Sadlerochit 9533' 9038' . . ~. ~1~ D~TA. ~I'~CII ~1~ ~~~S ~ ~ITIIO~OG~. PO~O~T~. FII~C~'~'~ ~~T ~I~ .,, - , , ..~' ~ ' .. ., ..... ~ .... ,. . , ,, ATLANTIC RICHFIELD COMPANY DS 9-6(13-1-10-15) API 50-029-20216, ADL 28327, Permit No. 76-48 Spud @ 0930 hrs 7-2-76. Drilled 17½" hole to 2738'. Ran 13-3/8" 72# MN-80 Buttress csg w/shoe @ 2714'. Cemented 13-3/8" csg w/5500 sx Arcticset cmt. Landed 13-3/8" csg, NU and tested BOPE. Drilled cmt, FC, shoe and 10' formation. Tested formation to 0.65 gradient. Directionally drilled 12-¼" hole to 8849'. POH w/multishot. Ran DIL/SP/FDC/GR. Ran and cmt 9-5/8" 47# MN-80 and S00-95 Buttress csg w/shoe @ 8814', FC @ 8730' and FO's @ 2461' & 2330' w/lO00 sx Class "G". RIH w/ RTTS. 6pened lower FO. Cement with 300 sx Arcticset. Close FO and test to 3000 psi. Opened upper FO @ 2330' and pumped 350 bbls Arctic Pack into 9- 5/8" x 13-3/8" annulus. Close FO. Tst to 3000 psi. RIH w/8½" bit to cmt @ 8496', drld cmt to 8730'. Circulate mud to water to Oil Faze mud. Drilled FC @'8730', cmt, shoe and formation to 8855'. Tested formation to equivalent mud wt 11.4 ppg. Drilled 8½" hole to 9231'. Cut Core #1 9231'-9262', rec 30'; Core #2 9262' -9293', Rec 27'; Core #3 9293' -9337', rec 44':, Core #4 9337' -9397', rec 60': Core #5 9397' -9415', rec 18'; Core #6 9415' -9475' rec 60'; Core #7 9475' -9535', rec 60': Core #8 9535'-9595', rec 60': Core #9 9595'-9655', rec 60'. Ran DIL/SP/BHCS/GR & FDC/CNL/GR/Cal. Ran multishot survey. Ran 7" lnr w/shoe @ 9648', top of l nr 8498'. Cmtd ~t230 sx Class G cmt mixed w/0.75% DG 5 & 0.03% D13, slurry 15.7 ppg. CI? @ 1930 hrs 8-5-76. Press tstd lnr lap 3000 psi for 30 min. OK. Set RTTS @ 8450'. Opened tools for 1 hr tst w/weak blow dead after 5 min for remainder of test charts indicate WSO tst OK. Ran CBL/VDL/GR/CCL logs from 9550'. Ran 5½", 17#, L-80, A-B Mod 8rd completion asbly w/shear sub @ 8429' and Baker "SAB" pkr @ 8290'. Press tst xmas tree. Dropped ball & set pkr. Ball sheared at 3250 psi. Press tst tbg & tbg anul OK Opened sliding sleeve. Displs CaCI? wtr w/diesel. Closed and press tstd sliding sleeve Ran GR/CCL & dummy gun. Press tstd tbg & tbg anul Released rig @ 1400 hrs 8-10-76. A PETROLANE COMPANY ~EPO~ T of . ~U~-SUNF/ICE D ~EC T~ ON~ L SURVEY COMPANY D. S. 9--6 WELL NAME P P,~dho e LOCATION JOB NUMBER A~'76 S01 60 TYPE OF SORVEY Multi -shot DATE 8-27-76 SURVEY BY Mike Black OFFICE 1 A_ as~a ................................ ~'U ~ ~Io G ....... L'EGI __ -~'.~.'S. D~'I FT' 'VE.RT I"CA"E ............. $O'B ........... DR'I'FT-'-----TOW-A-~--C-DORD~'NKTY~ ................ C--C--O--~--0--r~-'~'-S .......... S~V-~-I-~Y ~"~Ylo~ ~'[. ~--A'~:16'L ff .... ~EPTH .................. SEA- ............ D"I-~'EC ................................... 5"Y~TA-N-C~ -A-NG'L ~ DEG/iQ0'FT DisYANca ~ ....... ~'"~ ........... O'~. D M 5 __ 0 ~., o. o c- 5~".'00 ....... 5'6-g;"0'~7 5~-6"'~0'" ~ ~ ~ ~. 0-C'" ~' ......... 5'g-~,"9~N-'Y[-5-67- 5'%-"w o · o o o ~ 75 · ~ u . .... ~-0~ .... ~' 2-5 ..... 2 9'0". 0'9' ?~'5-;:'Og ........... S'~'~7¢0W ........... 5'¢5'i~'2-'-'N" '" *- · ~ 2-'-'?~ '~-9'9-;~'~--N--~"2-1--~-4-'~~ ~ S 0 Z 7 5 _S ................ = ........ .'~:~;' 0.070 Z'/~. ~Z 5'0'0 ........ 0-:I'5 ......... a g ?. ~ ~ ~4-5',"g-? ....... 5'3-~;00~ ........... 5-ff6',"IT' X,-' I'ZW' 2-5' '~ ~~R~~9-~"W.~ 0~-5'0: .......... 2T4. s 3" .... 60'0 ...... 0-'-2'n ...... 59g'.'9~' 5~"5';g'9 ....... 5'~";"~ ......... 5~"5-'.75 ...... ~:~' ;'ZS-. 5~'-'t,; ............. 5-~;-Z6~ ~z ~;-~~~0;~'~-~ ............. 2?-'s.s~ .... ...... SOo ..... o-~'~ ............ T~'q'. ~'~' T~'5""~'F ............ N'eT;'~OVF ........ F'S"5". 0'1" '~; ............ I'~.T&"'"~' .... ~¢;-~-~~9~-;- ' W '0;'~0 zT'Z'. ~ ~'-' ....... 900 ....... ;~'-Y~ ....... 8'0'0.9'R' 8~5"""g'8 ........... S"'"I'-'"'00¥~' ........... ~84"'.5~' 't.~ - '-~ ..... ~-ziW 0 3 30 .. Y2-O 0' ......... 0--'-0--TYg~";"9~W''' I'~:~5-.'g7 .......... DZW, U'0~ ........ 5-~'~ "7- 26~.7~ z 7 i",'6~ 273.5~ 27.5.79 g7'7 TRUE '-~'E/~-;--DRiFT VENT I"CAL '" SUB ..... ~~NGLE DEP'T'R S'E'A -2500 'O 50 'Z'499.B7' Dr'<TFT-------TD~~DF~X' T E $ DOG LEG DISTANCE A~'~GLE D£G/100FT D'EG. O M S N76.00E '586.15"-N' Iig.78 W 598.26 N 11 32 58 w 3.160 z~53 '1 Ih' Z'T.~z.8:~" z'6"gS.83 NS~,.0OE 5-8.'6.7~ N ~'5.75 W 598.04 N' 11 9 35' W 0.391 --- 2' g'3'~--~'~-~~-~~gg~;6' 6'~- N'4 g~-~'0'~~'~-~-0'~~:~- ;"!' f-w ....... B-~ 0]-0-2-' N'-i'-6-"'~"~'%-~ -':~- ........ f",'-8' 52 " 3'0Z~ ~'"~5--30~Z'8:.3~' 'z~r~--~'Z~~~-~'-FI N 1'~3-$~--~~ · 604.0'0 N 9 50 ~2 W 2.12<; ~'3"I 2'$ ..... 7-'45'~1~2~,-~'3'O~T."68 .......... N'~'~.'0'U~-EO'I",%-5--~ ......... ~"4-. 2'o .... w .................. -~-o 8-;-78-'-~ ..... '~-'"5'-4 ...... 5"-'-~ ....... 'Z 'Z1-2'9 ..... 3'Z1'"6 .......... 9--I ~--~'~;-6'~3-I"~g."66 ....... N62' .-0-'0':~-6'~'4'2--~~'-8'2" ,: ~ 6--'~q ......... 6' ~ 3'-;-9-?--N'- -7'-'4-'2--~-2-"W ..... ~-.-'5" i'9 SECTION DISTANC: '~7g.32 28'2.80 285.3. I 290.01 297,79' 308.80 33.6.87 366.75 993 385.56. ~35.11 · 501 470.54 · Tf'~- ............. ~0"5'"J8-8- ........... ~ ' _ ..... ~ ......... ~, - ........ ~ ....... ~ .... ~225~g ~~4.~~~CI0~,80~T3,.O.0~T0~.~ ~ 2~0*~E '7~'SVi-A--N--I"~--fO--i"o-'-~ 0.980 --~5'"U0--2'4 : 9 ¢~~~'~,-0'9'~8:%'U0~T52-'-66~-~' .... 3:"~'~--~2-~-;:-~--R--2'4 ...... ~:2'-E- 0 · 000 ...... '477~~~¢~E~¢;:~k:t%-~-8'0' ¢;-6;'-~:-~2-~,-Z¢~---9"2-i".' f~'-~'"': 8 - 2 ~ .... EE-'E' ........ -67287 541.32 s --~ 6 T'~%-*-,~- ................ R' ECOR'D--OF-'-$-O n V F.'Y .................................................................................................................................. -- ................ A L L C A L C 0 L-AT I'0 TRUE DOG LEG -D'~P T N--A~-G --~D'~rT H S-~'A-~-D' ~]~ E C D ~ S'T-A-~¢-E- .......... ~]xi'~L'~ .............. -D ~'G / ~ OOFT !) I 5 T ANCE ................... D .... ~. DEG~ ......................................... D ..... ~'~ ' 'S .......................................... --'5 [.~ ~ 5'-2'7~0 "z.- 9'0-6-.-8-A----4-8' 5~-" 8'z~--".~l 6 O. 5'O'E .......... 8'~%"-4-~~'5'~-'7-;-2 Z .... E .......... 102 7-. ~"5"-~--~-~--'~'~ ....... 5"'~~ ............. (~ .'2]*'g ~"~'~'.'6~" ~l ,~ 27~ ~98~;~ ~9~5.6i ~59.50.~ 890 68 N '5-~3-;-9~ E l'05'5'.'~'~-"'~j-'~'5-"~"~'7--E ............. 0'"'3]~! --5'2~1 .... 27-'~0 ....50~'2-~'2~5'0-~-8-"2-0 ........ N60.O'OE .......... 9"f2-';"2-2--~F~ ...... 6~-0-'"~8' ..... E ....... I 103-.4-7 .... ~'-"S-~-'14T"'2~' E .......... ~. 292 ......... ~"~'"~'8',-7~- .......... ~ ......................................... ~ ~ r~ ...... ~ .... 5332 ..... 27'"~-0 '-5'S'5-~'-9-2~5'0'9-8-,-92 .... N60.5'OE ....... 9-S-~-TO?' N 651-~'~--'E'-' ZZ~' 38 ~ S5 ¢'--5'~'-E 0 Z5~ .... 5'~"2'-Z~-S'~S~%~~5~'7'8-~'5 N'5'¢"'5-0~9%'~8~--6~'~-;-~-5--¢~-z'S'7''9-,-2-'~[~-~-6- .....b-'~'"~'E- ........ ~"'"5 ~ 3 Z ~ 6 ~ .... 552"~- 2'? IS~5~-%b"E4-~5~-6-O-;-~'4- ..... [;4"60 .-'00 ~--9'75';-2-~-~i .....7'2~-";'R'9 ..... E .......... ZZ-'~'S "0i ...... F~'-'S"~'-'A ~ ...... 5-~ ..... E ................ 0-. 2"¢'5 ~ ~ 82'--8'9 ....... '5'6'06-'-27~3-O~5-'S'Y-6~-~5'~-&-2"*-'~-~---N6 0 ~-5-0 E ..... '9'9-E;~-~ N -~"(¢6-*-~'2 ....E ........... ~'2-56.9'9-'-~--~"7 ...... ~-~ ..... ~-Z-'~ .................... 0 .'29'5 Z 2-2'~"*' 6-0 ~ ~0'0'~--'~5 --~ 5 ~79~2--' '- 5-~ ~'~r6-0"'"5'0~-0'I-7'~-~---N - 8-0~-2-4~-~ .... ~"2"L)"6- ~ 9'~-"'-~--~'~--~"~2"'~j--'~- -'"0- ~'2'66 1 ~'~'7-'- .... 57 ~'~ .... Z 6--~ '5'S6-Z';"~-8~'5":O-8-';-~ 8 ......... ~'. 6O-,-50 E ......... :-O"S-a';'2-S--N ........ 8 ~-0-;-9-8 ..... ~ .......... ~ S: 6'~":: ..... N""S-g ............. 0 ..... 29 ...... E .................. 0'. ~'S ~ : ~ 0 S'"'7'7 ........ ...... 5'88 5 27--'-0 .... ~6-~-~-,~-5"5'9'0-~5-~ .......N 6 0 · 0 O'S ...... 1-0~'8-;-~7-~-'---~-77-; 0 g'-'-' E ......... 197 z+. 9-5 ...... ~"-"9"~J ..... S-'~ ......... 9 ...... E ............... '0":"2"9 ~ 19 ~ 9".'7 7-- ......... ~ ~ $'9-2'~-"0 '5~-9~-5-6~'5"~"s-':"~'5-6 ..... NS"S';-O'O'E---I'i--I-'~-;"Z-~ N O"~-S'-~'~"2 .... E ........... :'~'O';i'~-N'-'~: ...... ~'~ ........ 5~"E .................... 0'"."~0': .................. :"~7o. ~7:"2--2~0~9~~-5 "'59:-g-;:-5~N'6':'."OO'~-:~9-;-O'S--~O-l:~7~: :-5'2"~-,-6-fi--I':' ~ ~ z, 9 '~-7"-S 0· o00 15'""l:~.69~'-- ~-'¢~'~-~2'~-'30-~-~:-S~:-I-7~SO-B"~G-I":~ 61","O'O'E~'ll-7-8'-;-'e'O~':"Og'O-"b 9-"-E ............ :'-6'0-5';'~"~-'~"-"~'Z i;"~ ...... l'7'""f- ....0-',~ ~'"~-- ....i-59 o" .... 6'62"~'B~-5~6-~6:~2"5'1-,"6'1' .......... N'6 ~-'; '0'0:~':'2-1-9'~-':'~"-- 1"~"~ 9-;'B"i- S ............ i~'~'5-~"-:-2'-~-'~'9 ...... '~- ~-~5 .... E 0 · 2 66 1'67 2-,'7'0 ..... '67'l'~'-~'~--:-5~-~e:~2-S~'SSS"-2 S ...... N'6'Z-;'O'O'~--:-2-~'-8-'~-:'~--~ ...... :':['~'~-"'-S: .... ~ ............. :'7'Z-S-;-~"~"']<~'"'4'~' ........ ~ .......... '~ ..... : ....... --6'T~"~-~ ......... ~"7: Z".'Z-Z'-' ~G-~5~~O~~~~6-:~-'-9'~'~FGT;'O-:~2~~~~2'S~-~'9~~i-7:-'l";~5- N ~ g 27 2 6 E 0 · 3 ~ 7 1 --' s e ~"8--2'5'-~~-5-~27T8~'54~'8".'7-8 ....... N 60','5'0'$ ..... ,1~ 77':'-:-~"""R ......... l'z ~<~'". '~"8 ...... ~ ............ l-~'Ob'-,-':-~'"]~--:~-~--'~-~ ..... 5'9-"-S ...... 6";-~-'i': .... i-~'9'~' ,": ......... ~ 9 ~'s"-2'5 ..... 0-'-6'~-~-~-27~S"5-8-0'.' 2'7 ......... N"6'l','O'O'K~:-2'~-5':-~-l--:9----'l-'S-d2-i-s'2 E ........ ~ ?9'7. :'~--:q"-~'5' ....... ~ S"'7 ......... ~' ........ ~ ,-~-9'5 ....... :'-: s z s' .'7 ~"- ....... 717'0 .... 2'5~'~~-W;~-~'"'57'bSG'05 ....... N6"::-O'O:--~"S'9-9",-'5'T-?:~-~ ........ 1.76.. 7 5 E 1'~'~-i". 70 .... ~---~-5-"-~"6- ..... ~"-"S ................ 0";'~'9'5 .......... ~'9C,~. 85 .......... 726 Z'""'Z'~--~'~~~Sl~-6'8'2'8'"5 l~N~-l~;"'OO:'--'I-:5'2-';-~'S--'hl--': z~O'S",' 5'9 ...... E ...... :-9'~"9";'0'7 ..... N""~ ~ ......... S .... ~"~;' .... ~- ................ 0-;'Z'7"2 .......... l'S < X · ~ ?-'- ....... 7 z~ z, 6 2 ~ ......... 0~ 0-~-9"~'~ .... '699 5.-57 ...... ~'60".'0'0'~!'~"8'9-';-9'~--~ ..... ~'47'0'; ~ 5 ...... E ........... 2~'-2-j-',"~-~ ..... l'q'-'"~ ~ ..... ~'~-"--~"9' ....... E ............... 0.8 ~'~ .................. 20 ~ f~ · Z-6' ---:R:ECORD Of SURVEY AL:L.~CA.LCULA.TTO-~$ P,~-'~OR :ED -6Y--~ B N, ElECTrONIC COiV, oUTER .... ~ EAS'; D'~-]: F'T--VE R-T-]:-CA-L: .......... :SOB .... I::) IYI F T ....... '¥OT-KL--C 0 0 ~-~-I'~-A-¥-i~-S .................. :"e-'£--'CY"-:~'-O--I~ .... E-'-$' ....... ~"~ ~.-~-~[ Y ¥ ........ --~E--~";f]-'~'i~-- 'DEG. . ?.1--22' ~+-5 73-02-;-1-~'72'4'8 . 13 ....... N60,O'OE i"/+'4"~-"-6'~ N '78'1'2--2'2--1-5----?-38 -6--"-2-0---W-3-3-2"-20--N 6'1 -,-0':0 E--]:7~-6-0-;"7-?' N .... 79"0-'3--2' 1--'4 5';----74-70'"-58"- 7-6'1'6 . 58 ..... N 6 0 . O-0 E---l'/47'7-',-5'5 N ... ..... DISTANCE ANGLE DE.G_/iOOFT ......... DISTANCE ........................... 0 ..... N ...... ~ ............. 8177'-20" 0 ........7727%"0'I'"'":'-7673'.01 N60.0'0'E ...... :1. 52'5- .-3'~--I~ ..... I709-"-4-1---E ....... 2-'2'~-i:"C~7f .... i~--:~-'-1'5'~2'-5-;-"E ............ 0'.~2~ ................. -2':'8'Ej.-06 ---' R2 7 1--I 9~0~78'1-5T6-2---7 7 61".'62 ....... N 6 0""0UE---I' 5'4'1'-J0-1~1~1-'736-,'- 5'9 .... E ........... ~'~-~T-,-2-4--'~-" ~'~ ....... 2-z~ ..... ~-:---P_' ....... l ."0 6'4 ............ 2-3'2 '0".'-0-2- ---PJ3-~7+-'].-8~~gU'3-.-6-2'-'W-$'~:'9-.-6'2 N6-O';-5'O-E---l-5-5'~;-9'~--N---l-'7-6-2:, 71 a · 2 3,5 1,1 9 N ~, 8 3 3 5 4 E 0 · 2 7 4 2 3 4 9 · 6 8 .... 8~-5'7--1- 8--l-~ 9-9T', -8' I---W'93 7 "." ~ 1 ........ N 60 "' '5 '0'-E ...... 15 "7 0 -.747--N ........ i -7' 88".- 3-9'-'5----2-3' -8 -0-;'"~-7 ...... N-'-'~ '~' '--4"2 ---4"~ ..... ~ ............ 0' '" ' 5' '58 ....... -2- ~ -ff ~"" '~ "5- --B: 3'B--1-T'--0----BT6% "-;1.'3~v :- 8TI'0"~'r 3--N' 6'l-','0'0'E---l'5'gT;-8-4 ~:-:- N7 ...... -1'8~6-J5-2 ..--K--2';k-3-zi:'~-3-l--7~--Z4'~j--'5-8~SI--'~ ..... l'-'""l=J-~--~~'%~'~ ...... 8728-T6--3'0--B'2'5'0-;'3-'I.-~B196'. 3 :~ ........ N'62 · O0E ..... I'61-0','2'2-~ ...... 1"8 5'9 '"31 £ .............. 2 "4-5 9", "6 '~c-- N--4"9 ...... 6"-72'3 .... F.: ............... 0"'5"6'3 2 ~+'5~3' o-79'-' ---' e 75-7--1~0---8':T8-.-I3---822'4-. t 5 ..... N6'l-,'5'0E----I"61-4':0'6"/~ ....... :'8'66-'-'z~'6 ...... E .............. 2-46'T:"5'~---N'-49- ......... '~ 5'"i ...... E ..................... 1 .'?'~)9 ........... '~'4~'~ ...... R 8 4' 1--1 5 ....... ~--.--'8'3'5'9";'Y2 ..... 8 30'5"o! 2 ....... N6'4",'-0'0-E .......... i'6' 2'Z~-;"~'5--Ni ...... 1-8"'8 6'"."2 7 .... '~ .......... 2"4-8"9-;'B'5--N'-'4-9-i5 .......... 5'4 -E ................ !' b 7 t3 .......... -~-4'8"~: .-6'~ .... 2.~01 ........ ~u~'3--2--1-2:--4-5 .... '8'~:4~fi,-:~'~- .... -83'93 ,"4:6 ....... N71';-0'0E'---i:'6-3'2-°'-79"/~ ....... 1:'9'0'6';-'41 ....... E---72'5'I'0 "'0'7' N'"'"4:9,'-'25--14 -E ..................... ~ ................... '"-"" ...... ~1 "I-6---l!--IS---8-6-FTJ4-:~---85 7'3-'°-43 ....... N 7'3';"~'0'E---%"~'~7~';-6-2--~F--l' 9"~: 2";-?9'- E ........ :2"5-4-~-';'-4:-~-'"N-"~,'~--4"5 .......... 4 .... E ................ 0 ,'"~"~- 6" ..... -~'~5"Z~ 5"."1 .... 92'0'9-T'i~'0--:7'i.-8-J~-9--8'664". 69-'--N'7'~;";-5'0"S---I-6'4-9";':'5--N .......1' 96'~";"0-2 ........ E ........ '2"57o'1";"~~'4:'' '"~i-"4:'9 ...... 5'4 ........ 5"! ....... E ............... G "2 7'5 .............. 2 5'6'1. . g.~'02--'J.-1---'O 8-8-0'9,-Jg-8---8'TS..~8~B.00~---T65~.31--~ ~977.I4 ~----23~95 N 50 4 48 E 0.103 2577..~+ ...... 939 5--I'0--YS---'8'9-0-IT3'8 ....... 88'z;'T'o 3"8 ......... N76-,-OO-E---1-6'5-8-,-&-i--'~ .......... ! 99B";"7-z~--~ ....... ~"'~-9-~-~-2;'5--'~-'"'~(j ..... ~.-'i~-"'3'-~"-E .................. o .'9"0":/ ..... :-'2"5'9'3-' 3 ........... 94"R S ...... 9 .... -0'--~'9'9-3%-0'7----$'9'39";0 7 ....... N'7'5";'5-0E-~I"~)~6'2';'~+ 3-'"N ...... 2. 00 8~-'8'1 .... E ..... 2--6-0'7";'2~"9 ..... iq"-5"0 .... ~ 3--2-~ ...... ~ ............... ]]o"~4/+ .................. -'~'607.47 ...... _ ,- ~, { '7~,T- -= 9'5'F"I----8'--T5' g-0'8-5% o Z .... 9'0'3'i-,"0'2--NT'T,-0'O:~---1-6-6-5-.-T~--N-.---2-0',:. 2:3-6--F..----2-6-2XYi-0'5--N-~'0 .... ~"~"-2 2--~' 0.8 ~J 7 262 O. ~; 5 ......... ~ .... i~ i'~ ...... "' ....... 959 ......................................................... ' ................ 5- ft 0 9098.88 9044.,,8 N76.00K'- 'I66~.21 :~ 2024.28 .... E ....... '2:'6-21' ~';"'6 7' ........ ~i--5"0 ...... 32 .... B"0-"~ ................ i-"'7-C)"'i--: .............. ~"621o83- 96 5'5 ....... 7--3-0'~9T5-8-.-3'3 .......... 9'1."04-;"3-5--NT6T0OE-~I'6'6-8-.":I"7-t~: ..... '2"(:f3-2-dl-3--kT--2-6'2-9'-,-l'~;--Ff-'5'0 ....... 3 7 ........... :3 ...... ~- .......... 0-' 'ii':': ..................... ~-4'2'"9' ..... BOTT 0:~,-' Fl'O'L-I:-~-S13RE~- 2-S'2'9'*-174--FEKT--KT-?C-5-0--3'7 ....... -~ .... E 'T~'U'~' --~rA'V-E D~T~' DEPTH .......... , ~~-~ ~GLE. SEA , ~OP '5'ADLR - 920i 8710.8~ 16~9.30 N 1958.53 E 2560.~7 N 49 53 55 E 8656.8~ ~'A'SE .... 5AD g533 ............ ~-03T ."5'~ ........... ~6'5~-~'6-'R ....... ~'-1 5'~'g--E ........2"513~-~~~--27-'I"4 E '898'3 25z~ ':3'5'z+' 55-4- I3'5~-. ............ i300 0 O' ............................ Y4-5"~'. ......... 1~00 ................. 0 '~- ............. 583.2~ N 1~6.50 W ~5-5~-,-----i'50'0- 0 0-- 582.75 N !26.79 w 2~7'5 '/~. '2-r5'6-~'----2 7 0 0 ....0 ..... r~ ........... "J ;~ o · 7 .~ ~N 1 1 5. '7 2 W ................. -29 5"~ 2"gift",- .... 290 0 ........... '0'~ .......................... -0 .............................. 5-9-O";-g~--F[: .......... i"O 8.1'7 --W .............................................................. ~ .................. '~'05 '~ ........................ 315-6'. ..................... 3 5'62 I'.:_ASUR ..D ................. DE° TH 3'g-~ .377 .... 3'8-~-2 -- -'3 g 9-2 -4'5'5-1 ....................... 4.6'62 ..................... /g'77:3 499-6 -V E°,,TI'CAL 'J-SUB "~4 D--'~T'WJ VER TTC"~'C ' D--E~-TTC"TS'E'A-'-D'I~F'F'E,~-E~-CE- ..... ~-~OWR-E'CT I 0l~ ............ ?'O'T A'[- 'CO-OR-D iNA T E S ..................................................... 3654, 3600 11 ',37"5-4"o '3'700 .......].-7' 3'1~'Z7.--3-~0-0' ' - -2'S 3-9'5'7+", ..... 3'90'0 ........... 3"7 7-+-0"5'4".- 4-00'0 ............. 5-0 ~' i5/+-~~-'-~0 ......... 6-5 4-2-5-Zj, ....... -4-2-00 ............. 4-3-5-/+- .--".-4 ffO-O ............ 8-8' .. _ f 1 ............. . 6"6-0.88 N 7'7 .'9"2--'E '9 672.58 N 122.'21 -'E ............................................. T3 ....................................... 6' ~-5' '--b~4' -"Fi .............. 1'71- · 9'2 -E ....... K5 ?'0'0';-~-8--1q 2 .... 2,.~_'" '-.' 'v .... ~ ................................. $ ," ................ '-c ................................. ;';'.;';-'"_--..-_ ib ................................... '7'~. i .'-O-~'--'N- ............ ~-l'~ ."~b E ............... 4 4-5-4-'--4'z/0'0 .......~ '9'-- ~' fi~)-'"8'?--l~ ........... 3"'~2;' ~ 'z;'5':5'4'. ......... 4'50 0 ....... I'07 ......................... ~d--- ......................... 7 ~ ~ .~'6' "~ ............ ~'9'5"-2 9 .... E ............................. ' ...................... ~6~zF;' ......... -4'6'0 0 ......... 1'!"8 ............... . ........ ~ .... l'"$ ................................... 80i~ .-df6-'-~] ................. %~"7'~-fS":E ................................................. -- 510'8 '~Wz~ .... :4'9'0O ........... 1'~2-- T% ...................................... ~"~-l'JS'J--~ .......... -~-8"';'O'~'-E ..................................................... ................ ~ 3'3~ ~ ~:l~'~-~5'-rO0 .......... 1Wg- !~ .................................... -g"3-%"Yl .... N' ........... %-¢?'7% 5'-~6 ' 5'2 5 ~ ..... ff2'O0 ............. I~2 ........................ %3---7 ................................... 9'5 g"'.W2--N ............. ~ b'2~ jS"3-'=E ........................................................... ~' ~----- 5'5'5 8 :'5-~-5 4' ~=-- ' -5 ~'00~~ :~: z '~-5-~~~~V"~'WE · ~ ............................. .¢, ..................................... -~ ............. ....................... 6':00-8 : ............. ' '"'57'574-,---~----~2'5'4 I~2 ............................ I-0-8'E;-5-6-~ ............ .................... '~ TI'9 ............... 58 ~-;'--~'00 ....... -72-6'5 1] ................................................. I ~'I0 g'83-"N- ........... 9'~-8 :;%'0 .... E ......... ...................... ...................... 67'8~' 6'~'5-~g ........ 6400 ............ 3'~z~ ........................... I'1 .............. i'2 5'3 ,-~8 ]<~" 12'2 7, 6~ 9 9~ ~ ~' ~'~ ...... "' 6'5'¢0~"4~ 'i%'~ 1"2-%7~-~'~ N 12 6 g. S 5 E -~TZ'O'- ~4-;----'6'V:0"~=73 6'6- I-I i-2-2~T'3-5'-~- ........... ;"i'!~'~'i" Tl~ ..... d~ ...................................................... -- ': "-0- ........................ -~ .... ~ '~ ........... A"~ ......'" ....................... 73"4U' E~5"4-;----'6'g'O0 .......... 3~V i 1 _, 6 ,.,. ~ 2 ,, ! 4 :s,. TRU[:: .............................................. - ...... ,',:':'~ ,'t'. "'7 ..... 7"-" '"' .......... ' '" ' ........... DEP'T~ .......................... DEFT'Fi ....... SEA ~.~[ -~ .... ~ ...........:'-'"' ........... , '"' F ~' r...,.~ t:.~/[ Cu~'~Rr..C T [ ON ............... -ToTAl-" ...... 75'60--'- ............ 7154., .......... 7LO0 4,0'6 ............................... '-":' 0 ........ , :I.~ ~2.58 N 15i0.2~---~ "' ................ 7'6'6-'~ ..................... 7'x ,:~ 4. · ........ "' ....... .. .... TTT7 T3'Sr,. ........ 73'0'0 ...... &:'2-~ 8 1454..28 7'8'8-5 ................... 'r4 54'. .......... 7'40'5 ....... 43"1- ..................................... ~: ................... :).-~--7-4- ~ -2-2-"N- ;'v~z ............................... 7 "5'5 z~. ............. 7 F0-0 ......... 4"3"8 ..................... 7 ............................... :[~9"ff'ZS-i-x~ ..... ~O'g'g' T5'54:'"----7 800 .......... z~' z~'5 -- l 8'2'0-5- ........................ 77'5 ~ ;' ...... 7 700 ....... z+ 5.2 .............................. 7 -~ ............ 8-3'I2 .................. 7 ~ 5~, .......... 78 O0 ......... 458 ..................................... 6 ": .... K&:-7 7'9' 5'~'. ....... 790'0 ............. 4'63 '5 8'5'22-- .................... 805'~ · .....8'000 ....... 4.6~ ................................. -5 .................. 8-527 ...................... ~ 1 5 4. ......... s I' O0 ........ z~-"r-: ........................ 5 - 8', 7T2-- ................ 82',~'~". ....... 8' 2'0"CJ ........... t~:T8 '5 .................. 8'939 ........................ ~ ~5 ~ , .......... ~ ~-'00' ............. ---- "- .... ~'O't,'l ............. 8'55'~,', .... 850'0' ...... '97~ .~. .......................... 86 5'~. ............ 8'6'00 .......... 48~ ............................................. 2 .cr2'~-5 ........................... 87 ~ z+, ............. 8700 ............. z~"9': ....................... . ....................... '2 ~':z~'7 .................. :'8'5 ~, ........ ~"8 O'O ........... ~9'~ ........................... '2 g~"z~ ............................. ~9'5z+', ...... --8o00 ...... : ...... z~gz~, ......................................... 1 ,, - ' L V~-.Asr. JR~D ~' VER.T-I-CAL SU~ TO"F At.: C~A'T~ s ~000 -999. 94'~. '~-8-'~"~-,~2 N 127.85 W 2000 - - 3000. · 4000 5-000 ~'00'0 ?0-00 2999. 29~5. 5~'3-"~ 39 N 105.39 48'5-~. 4803. 8'5-T J2-? N 525.44 5-7 4"7'~ .......... 5"d93-; 56/+-5'. ............ 55'9 ~i · HOR IZO N TA L SCALE i"-i000' ATLANTIC ,RICHFIELD COMPANY DRILL SITE' 9-6 R A D'I US '.0 F '-C U RVATU R E MAGNETIC MULTI-SHOT. .... i .......-: .......! ............ ? ................ " .... . . a4oo e.~® TVD: 9 158' 7~o~~.x x' TMD= 9655' - ............... ~- : .... · . .... . ALL DEPTHS SHOWN ARE TVD. .... ._ . _ : ..... 44~ .. ., .......... VERTICAUi SECTION..~ · , ATLANTIC RICHFIELD COMPANY ; ' i ....... DRILL SITE 9- : RADIUS - OF- CURVATURE ............ ; ........ -! ......... MAGNETIC MULTI-SHOT~ .................. t ALLARE-TvD.DEPTHS SHOWN _ . . 8400~ ' ' ! ' ' ' TVD = 9158' "~ TMD = 9655' ...... - ........... . LOCATED IN THE APPENDIX UI WFL gl IPR LOG Ui CALIPER SURVEY UI VOLAN CURVE DATA [~ STRATIGRAPHIC HIGH RESOLUTION DIPMETER UI OTHER: North Alaska District Post Office '~"'~'< 360 Anchorage,, ,aska 99510 Telephone 90.7 277 5637 August II, 1976· Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir' Enclosed please find the Monthly Report of Drilling Operations for the above mentioned wells. Si ncerely, C. R. Knowles District Drilling Engineer CRK/jr Enclosures Form ~o, 1,.--4 R~V. $- I-?0 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT IN DUPLICATE NU~fERICAL ~ODE ' 50-029-20216 6 LEASE DESiGN'AT'ION AND SErRIAL NO. ADL 28327 , IF INDIA]~'. AL, OTT'EE OR TRIBE NAME 1. 0iL ~ G~,S C~ W~;LL WELL OTHER Prudhoe Bay 2. NAME OF OPERATOR Atlantic Richfield Company P. O. Box 360, Anchorage, Alaska 4. LOCATION OF WELL 639'N & 797'W of SE cr Sec 2, TION-R15E, UM 9 WELL NO )S 9-6 (13-1-10-15) lO FiF. LD A_ND POOL. OR VflLDCAT '.rudhoe Bay - Sadlerochit Pool ll SEC. T.. R., M. (BOT'TOM HOLE OBJECn'~ Sec 1, TION-R15E, 1~.. PER,MIT NO 76-48 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CLWIF~NTTING JOBS INCLUDING DEPTH SET AND VOLU1VIESUSED, I:~F-~I:~FORATIONS, TF~STS AXeD I:LESULTS FISHING JOB~ JUNK IN HOLE AND SIDE-TT~ACKED ItOLE ,~IYDANY OTI4ER SIGNIFICANT CI-.IA~GES IN HOL~ CONDITIONS Report on operations for the month of July. Spud @ 0930 hrs 7-2-76. Drilled 17½" hole to 2738'. Ran 13-3/8" 72# MN-80 Buttress csg w/shoe @ 2714'. Cemented 13-3/8" csg w/5500 sx Arcticset cmt. Landed 13-3/8" csg, NU and tested BOPE. Drilled cmt, FC, shoe and 10' formation. Tested formation to 0.65 gradient. Directionally drilled 12-1/4" hole to 8849'. POH w/mul ti shot. Ran DIL/SP, FDC/GR logs. RU and ran 9-5/8" 47# MN-80 and S00-95 Buttress csg w/shoe @ 8814', FC @ 8730' and FO's @ 2461' w/300 sx Arcticset. Closed FO and rev out 5 bbls cmt. Reset RTTS below FO and pressure test csg. Opened upper FO @ 2330' and pumped 350 bbls Arctic Pack into 9-5/8" x 13-3/8" annulus. RIH w/8½" bit to top of cmt @ 8496', drld cmt to 8730'. Circul 8855'. Cut Co rec 44 rec 60 ate mud to water to Oil Faze mud. Drilled FC @ 8730', cmt, shoe and formation to Tested formation to equivalent mud wt 11.4 ppg. Drilled 8½" hole to 9231'. re #1 9231 '-9262', rec 30'; Core #2 9262'-9293', Rec 27'; Core #3 9293'-9337', " Core #4 9337-9397' ' ' ' ' , , rec 60 · Core #5 9397'-9415', rec 18 · Core #6 9415 -9475 "Cutting core #9 on August 1. 14. 1 hereby certify that the f~regoing i~true m~d c°rrect ~/~{/? NOTE --Report on this form il required for each calendar month~, regardless of tho status of operation~; and must bo tiled in duplicate with tho oil and gas conservation committee by the ISth of the succeeding month, ufllee~ otherwise directed. STATE of ALASKA DEP/~llqENT OF NATURAL RESOURCES Division of Oil and Gas TO: [-- O. K, Gilbreth, Jr.p// Director Thru: Hoyle H, Hamil to.n//z~ Acting Director Be, LeNorman ~~ Petroleum Inspector FROM: DATE : July 13, 1976 SUBJECT: BOPE Tests Arco DS 9-6 .J_u]~,._5~_ 1~7~ - Departed my home at 6:00 AM for 6:25 AM showup and 7:25 AM departure via Wien Flight #9 to Deadhorse.. Arrived Deadhorse at ~:55 Alq and at Drill Site #9 at 9:30 AM. Drilling foreman for Arco was Kelly Goff. Toolpusher for Rowan Rig #34 was Jim Weatherlyo Cementing was about to begin and it was a certainty testing would be delayed until the following day. Temperature +26~ F, high scattered clouds, wind l0 HPH from the north. ,. ~e toured the location which ~was well organized, reserve pit well built, rig in good repair, steel welded fuel tanks not bermed and well sign not received from Anchorage. ~ . July 6~ 1976 - Tests began a~.~ 1:00 P~,~ with the hydril testing to 3000 psig ~tiii-z~i~'aTrcraft hydraulic-fluid and sprague pump. An attempt to test the · top pipe rams resulted in a bonnet gasket leak and the gasket ultimately had to be replaced. !,~hile the bonnet gasket was being replaced we checked the accm~ulator pressure which was 2900 psig. N2 backup bottles tested to 2100, 2200, 2100 and 2150 psig. Tests resumed at 2'00 P~,i with.the top pipe rams, bottom pipe rams, both wing valves on the choke line and wing valve on the kill line testing to 5000 psig. However, none of the three Halliburton Lo-torc plug valves on the choke and kill lines could be opened under pressure even after bleeding down to 1500 psig. Kelly Goff became quite upset about this and asked the toolpusher to replace seals in the valves and also add a second valve ~i.~.~'~[~the kill line. He further displayed his displeasure by talking~ with P~ob H~"i~es' in' Anchorage.~ , Gil ~.~eyer at Prudhoe and Hallibu:rton's North Slope representative. According to Hr. Goff, Halliburton advised him tJlese valves could not be expected to open under pressure unless they were maintained (gone through) monthly. There then followed a fifteen minute dissertation on the probability of such maintenance occurring with rig crews available today. ~,!hile these repairs were underway ~,e found the dart type floor valve on the floor. The ball type, hm,~ever~ was shopped in Anchorage. We asked that we be notified of the disposition of this valve by Friday, July 9th. This is so noted on the field inspection report. Ben LeNorman Field Trip Re~rt -2- July 13, 1976 Tests ~sumed at 8:00 PM with the blind rams and the added wing valve on ~ kill line testing to ~ psig. The check valve also tested to 5000 psig. The ~11tburton representattve~ suggested the four valves be lubricated and they were again ~sted to 5~ psig. However, none could be opened under $~ pstg. ~ valve, h~ver, was bled back to 3000 psig and successfully o~~ with t~ aid of four roughn~ks and two cheaters. By 11:~ PM we s~~fully ~sted 13 plug valves and 56 flanges to 5000 pstg. The Swace superchoke was ~~d to both opened and closed and the manual adjustable c~ke wu free moving. J~u~ly 7, 1976 - Tes~ res~ at 12:05 AJ~ with the kelly cock testing to 5000 ~gi~]J ...... [~ kelly valve tested to 5000 pstg and tests were concluded at 12:35 AM. A fte!d Ins~ton report was prepared with the original given to Kelly Golf, a copy mailed to Bob Hines, a copy attached to this report. ~parted Oeadhorse at tl :55 AM via Wien Flight #24 arriving in Anchorage at 2:30 P~ via Fairbanks and at my home at 3:05 PM. In sary, I witnessed successful BOPE tests at Arco's DS 9-6. Attac~t Sati sfactor Reserve, Pit-{ ,, :4'..' ~Ri'g Ala Oil and Gas COnservation Commit Field Inspection' Report Wel 1/~ Represented by~='~/~F.,_,~/~~ Name & Number 0.~ ~ ~J~-~ pect]on ~atis', actory Type InspectiOn Yes No 'I'tem~ (~OPE TeSts () --~-.j~Cas i ng ) 16. ~ T6~t ~fl uid- )mud ' 17, Master HYd. ,'2'2. Choke Flowl'ine .'Choke ( ) Safety Valve Tests ( )~ ( ) 5. Surfac6'~No. Well's ~" ( ) (), 7,. (:) () () () 9. , , ,., ' lO, -- ( () F "6''.' - (~) :ina~a~m~',~ ) 11.. P&A Marker ( ) 12. Wate~?Well-( )capPed( )plugged ( ) 1.3. Cl.ean-up Sec,/ T~ R~,,_~.M lets alve n io .. nd Rams 29. Kelly & (~. ( } 30. Lower Kelq~ sig rs ~ none . '. ,~ (') (), 1..4 .... Pad leve.ledtime. _.,h~:s~,~.,.:¢ofal.number..leaks'~ ~ l?~'""Totai i'nspecti']'6n'" "°l~'e'f~'{'i O'n ' )~''' ) ..,3]..,~ .~'a:fetYand/orF:l oOr.eQuip.Vam ~l'ves'-~ ............ fa~ 1 ures t ...'~.'~,~ '.~.~.:'~...'~Rema r kS ...... __..'. ~ ~~/-"' ... . . ....,... ,~.~..~,.: · . ..~,..:.,:..~..~ .~""' ~:... -~~. ,....,. ...~....: .<:..:,., "':' ....... .... .~ ...... . :'.-.. '. . .'. :....~ .... .. ·. · . . ..' .'- ... .' ... .. . :' .. ..?.-~.~',." .... ... .... ' .. ' '.'. ".: ' '.".' :, ..'."F ' · . '.· ..~'.., .... , . :,:..:;:.. - . . .. . .'_ . ..'.'.' . ... · __ .._ . . . , . . · . ~ - .. .:.:..~'.. ~...?.~.:.cc: ~..~.%,~...N.ot~f~ ~n.. :.,. da~s '~r'~hen.ready ..' .InsPected by.~ '~'"')a,~,~,.,:,,~ate ~{~>.~-..'~,........~ ~,'.[?:~,:,'~.~,,.,::~.. ....2"'". ':.2'.'~?':~'.. ..... ..::.'.:~3'-~":~'~':"::'.~:;~".~'~.. .. . ..... . ~:~:.`~.~`.~.~..~L~>~`;~..~.~.~:~<~.~.~.r~?~.~r;~:~?~..~:~...` .. . . ... . ..'.'... . . -. :- . ..' .. i~:~.:,:;:~;~::.$~:~.,,.r~.,,... '..... .... ;,..,-......~........~ ~,'-L...:".': fL:.-....,~".?~.'~,. .. :~::-.".:'.,~;,'.:.L;'k,.:k..3,,,,:~i:~.'. . . . .~.~,;~:~ '". ...,. , .... . . . ....... . . . , . . . .... t.~,~%,, :,.~:.. :.. ... .. '... ..... .... · ..... ......... .....:........' ..... .. '..: ..... · ....· . .'. . . ..... .....,.~.,.~: ...... ~. .......... · ................................................... ,, ..................................................... z ................. : ................... ~ ........ : ....................................................... . .... . ............... · ........................... . ................. : .......................... ~ ....................... 2 ....... ; .................. · .............. :..., ~** Division of Oil and Gas 3001 Porcupine Drive, Anchorage, Alaska 99501 May 17, 1976 Re: Prudhoe Bay DS 9-6 (13-1-10-15} Atlantic Richfield Company State Permtt No. 76-48 C. R. Knowles District Drilling Engineer Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 Dear Sir: Enclosed is the approved application for permit to drill the above referenced well at a location in Section l, Township lOft, Range 1SE, U.t4. ~' t~ell samples, core chips and a mud log are not required. A directional survey · is required. Many rivers in Alaska and their drainage systems have been classified as · important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder {Title 5, Alaska Administrative Code}. Prior to conmencing operations you may be contacted by the Habitat Coordinator's office, Depart- merit of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 03, Article 7 and the regulations prolmulgated thereunder {Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded, t. le would also like to be notified so that a representative of the Division may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. C. I~. Knowles 2~ May 17, 1976 In the event of suspension or abandonment please give this office adequate advance notification so that we may have a witness present. Very truly yours, Thos. R. Marshall, Jr. Executive I~y ~. ~--,~¢~ Alaska Oil and Gas Conservation Committee Enclosure cc: Department of Fish and Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Department of Labor, Supervisor, Labor Law Compliance Division w/ encl. A-tlanticRichfieldCompany North Amel ~, : Acing Division North A~ask~, '-' Post Office Bo~ 360 Ar~chorage, Alaska 99510 Telephone 907 277 5637 May 6, 1976 Mr. O. K. Gilbreth State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 RE: DS 9-6 Dear Mr. Gilbreth: Enclosed herewith is our Application for Permit to Drill DS 9-6, a $100.00 filing fee, and the required survey plat. For your information, as well as for the State Department of Labor, the surface and target location are on Lease ADL 28327. The effective date for this lease is October 1, 1965, with a termination date of March 27, 1984. Very truly yours, C. R. Knowles District Drilling Engineer CRK/BI)R/j r Enclosures STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN la. TYPE OF WORK DRILL ['~ b. TYPE CF WELL OIL GAS [~] 9,-~. L L ~ WELL SUBMIf IN YRIPLICA'I'E {Other instructions ;cvcr~e side) OTHER DEEPEN r-'] 2. NAME OF OPERATOR Atlantic Richfield Company 3. ,'a, DRESS oF OP~TO~ P. O.-Box 360~ Anchorage~ Alaska 4. LOCATION OF WELL At surface 639'N & 797'W of SE cr, Sec 2, T10N-R15E, UM At proposed prod. zone -8800'SS, 1320'N & 1320'E of SW er, Sec. 1, T10N-R15E, LIN 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOV,.~ OR POST OFFICE* Approximately 6-1/2 miles northeast of Deadhorse API # 50-029-20216 6. LEASE DESIGNATION AND SERIAl. NO. ADL 28327 7. IF INDIAN, ALLOTI'EE OR TRIBE NAME 8. UNH' FARM OR LEASE NAME Prudhoe Bay 9. WELL NO, IDS 9-6 (13-1-10-15) 10. HELD AND POOL, OR WILDCAT rudhoe Bay-Sadlerochit Pool I 1 I. SI"('., T., R., M.. (BOTTOM IIOLE OBJECI'iVE) Sec 1, T10N-R15E, UM ... 12. .. 14. BOND INFOP~,L%.TION: Ty~tatewide Suretyand/orNoFederal Insurance Co. #8011-38-40 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest drig, unit, if any) 3960 ' 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 3800 16. No. OF ACRES IN LEASE 2560 19. PROPOSED DEPTH 9 800 ' 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 21' Pad Elev. 23. PROPOSED CASING AND CEMENTING PROGRAM , ou4lOO ,ooo.oo 17. Ne. ACRES ASSIGNED , TO TillS WELL 320 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START July 14, 1976 SIZEOFHOLE { SIZE OF CASING [ WEIOHT PER FOOT [ GRADE SETTING DEPTH Quantity of cement 32" 20" 94# H-40 100' + Circ to surface approx 500 sx 17-1/2" 13-3/8" ¢-2'# ~N-80 2700'~c Circ to surface approx 5500 sx ±2-±./4" 9-~/8" 47# ~q-80 8870_+-- +_2500;cmt column 1st stg. +_ iSOU-q & S00-95 300' cmt column 2nd stg. _+ 300 s: 8-1/2" 7" 29,// N-80 9800'+ 2ut to top of liner 1.a_p (300'+) SX The Atlantic Pgchfield Company proposes to directionally drill this well to 9800'b~ + 9207' TVD + to produce the Sadlerochit zone. Logs will be run across selected inter- vals. A 20-3/4", 2000 psi,'Hvdril will be used on the 20" conductor. A 13-3/8", 5000 psi, Hydril and 13-3/8", 5000 psi, pipe and blind rams will be used on the -lf-3/8" casing. The BOP equiPment will be pressure tested each week and operationally tested each trip. A string of 5-1/2" 17# N-80 tubing, packer, and necessary Provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. The well will not be perforated at this time. A non-freezing fluid will be left in all uncemented annul± within the permafrost interval. IN ABOVE SPACE DESCR.IBE PROPOSED PROGILttM: If proposal is to deepen give data on. present productive zone and proposed new productive zone. If proposal is to drill or deepen ditectionally, give pertinent data on subsurface locations and measured and Rue vertical depths. Give b!owout preventer pro.am. 24. I hereby cert;~at r)e F_or~going is True and#orrect DATE T, TLE -" .... j - : : yA' Cihis space for State ofli~ use) .SAMPLES AND CORE CttlPS REQUIRED ~-:s ~ ~o YES [] NO CONDITIONS OF APPROVAL, IF ANY: MUD LOG [] YES ~ NO OTHER REQL IREMENTS: A.P.1. NUMERICAL CODE 50-029-20216 PER?.!!TI,,~O. ~ 76-48: APPROVAL DATE May 17, 1976 ApPOvED BYe:& /~/~/~~~]~? Li TITLE Exec. Seoretary DATE . May 17, 1976 *See Instruction On Reverse Side WELL Nc;. l 70°! 4'34.121" LONG. 148 14 28.254 'WELL No. 2 . LAT. 70~ 14'35.27'3'' LONG. 148'~14'28.969" WELL No.~ LAT, ,'tOO 14' 3G.429" LOt,iS..' 148° 14,29.691" WELL N'o..4 LAT. 70° 14' 37.583 LONG. 148°14'30.425 WELL No. 5 LAT. 70° 14' 38.735 LONG. 148° 14'31.151 WELL No. 6 LAT. 70014' 39.885 LONG. 148° 14' 31. 870 Y 5 941 501.83 X 717 747.01 Y 5 941 618.22 X 717 719.06 Y 5 941 734.95 X 717 690.84 Y 5 941 851.48 x 717 662.20 Y 5 941.967.87 x 717 633.88 Y 5 942 084.09 X 717 605.77 WELL6{ WELL i ~'ELi i 1 WELL 3 WELl. Z SECTION 2. ~ ;,.~ ,.; . . CERTIFIGATE OF SURVEYOR I HEREBY CERTIFY TIIAT ! AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY ~DE BY ME OR UNDER MY SUPER- VISION, AND ALL DIMENSIONS AND OTHER DETAILS ~E CORRECT. DATE OF SURVEY SURVEYOR 797' 772' 747' 7:>2' 697' 673 ' SEC. SEC. I EXISTING WELL OR CONDUCTOR PIPE 3/23/76JADDITiON OF WELLS Nc 4 ,S &6 LOCATION GD GD -~/4/TGjADDITION OF WELL No..3 LOCATION DATE t R£VISION CKD ARCO No. HVL I'!o. 32-D59 -76 ATLANTIC RICHFIELD CO. AS BUILT DRILL SITE No.9 WELLS No. L",, 5 6 LOCATED IN PROTRACTED SECTION 2, T lO N , R'15 E , U.M. PREPARED BY HEWITT V. LOUNSBURY & ASSOC. 723 W. 6th AVE., AI"ICItORAGE, ALASKA DATE }/27/76 SCALE 1":300' CHKD. BY GD FIELD BK LOOSE LEAF CHECK LIST FOR NEW ~'~ELL PERMITS Company Yes No Remarks ,, . Is the permit fee attached ' ' ~ Lease & W el 1 NO. ~~,~ j~ ~ Z:::>,.S'~;;~-~ _~. Is well to be located in'a defined pool 3. Is a registered survey plat attached .................. J. Is well located proper distance from property line ........ -. /~ ~. Is well located proper distance from other wells .......... ~ k. TS sufficient undedicated acreage available in this pool ...... 1. Is well to be deviated ...................... B. Is operator the only affected party ................ J~ 9 Can permit be approved before ten-day wait ............ ~z~a~ Does operator have a bond in force '. .... · ............. /(z~, . Is a conservation order needed ................... . Is administrative approval needed ' . ...... Is conductor string provided .................... enouqh cement used to circulate on conductor and surface .... 1 cement tie in surface and intermediate or production strings .~: Will cement cover all known productive horizons .......... ~. Will surface casing protect fresh wa.ter zones ........... 8. Will all casing give adequate safety in collapse, tension & burst O. ¢oes BOP[ have sufficient pressure ratin~ ...... - ....... ~dd~ t~onal Requirements' Approval Recommended' Geology. Engi neeri ng' TRM q~ljbl/k, HHK )~Z-~/cl OKG ~ HHH ,]AL ' ' 'LCS '~'~:~JCM Revised 1/15/75 Well History File APPENDIX Information of detailed nature that is not padiculady germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. .. if,}~}'3RARY TAPE {2'0 P, VE S P E C i[ F )i CAT i O N S Atlantic Richfield l~reil DS 9-6 Field Prudhoe Bay State North Slope, Alaska Curve (Abbreviated) St~.nds. rd Curve Name Logs U~'~;ed Sco!e TC2 Total Counts K2 Potassium '~ SP ] .5~I0 UR2 Urai, ium I SP I -23_25 TH2 Thorium SP -- 75-- 25 ~ ................................... TCi Total Counts SP .I.. )T!P0. / K1 Potassium SP j . '.-- 0 / UR1 Uranium SP ] - 25-- 25 / T H 1 T h o r ~ 'u m S P [ - 7.5 - 2 5 ECC NUMBER 58q~8.00 :AN? I..C......~ I CHE I E.L..D - --.,~.DS 9..'r 6 CURVES : K 1 ...... UR ~. T H 'il T C .,.~,2 ~R 9~00 0 TO 9500,0.0 ...... ....... ~,.,25_.. SAMPLES ~E.,,.~ !~CO~O PAGE 1 ATLANTIC PRUDHOE BAY .... NORTH OA.TA,._.E,VERY RICHFIELD .... DS 9-6 SLOPE!, ALAS<A 1 . 0. 0 19. 93 5O )2 TC2 _!9,74 ,74 19.B~ 08 19.69 6 19,83 ~_.13 ..... 20,!8 9303.50 20,86 O,$5 2,50 3.92 20.61 2 2 B~ 3 1 3.~9 21.46 9305.50 22.89 1.01 3.84 3.05 21 98 ?307.50 20.63 1.02 .4.03 2.59 22.01 930~'~"'00 ....... I9'~'"~)~'' i':"6'-~ ................ =":"~"~"~-~ ...... ~-'~"6 ...... 22.'02 9308.50 19.22 1.01 ~.52 2.~1 22.03 <2 IJR2 TH~ 0.84 3.50 0.53 3.55 2.~7 0.78 3.02 0.74 2.57 2.35 0.69 2.67 9.37 0.65 2.93 2.5~ 0.62 3.0B 0.02 3.21 ~.00 0.02 5.~1 3.05 0.63 3.37 2.6~ 0.07 3.39 2.~0 0.79 ~.45 ~.~ 0.97 5.71. 2.71 1.04 4.1~ 0.79 ~.74 0.93 4.21 ~.~ 0.92 5.68 4.55 0.84 3.40 4.0~ 3.20 4,n2 2.8~ q.~3 2.62 ~.7~ 2.94 5.03 9309.50 18.81 0 30 e.~3 R1.65 n.7~ ~"3id~'26-0 ..... i§"2'65 ..... ss o.s9 9310.50 18.q9 0.85 S.IO 2.69 21.50 0.~7 .............................. ~'S"id":O~ iA'"':"b~ ........... ~-'2~i/~2i~ i .... ~ig~; 0.79 ~'3'i~-'Ob ............... i~'~S o.~ 2.60. 3.2s ~. o.7~ ~ ~~ I-S: 0.73 95ig-,'0"6 ................. i'"~'-";~ :~F~!di~ ~ ~~16 0.70 9~i'~"2"00 ........... i~":'~l 0.79 3.90 2.88 18.9~ 0.66 9~1~.~o eo.~ o.~7 ~.2~ 2.~ 1~.9~ o.~ ~7.~o 2~.~m o.9~ s.96 ~.o~ 22.19 931R.50 29.64 1,09 2.64 3.25 28.19 0.93 9320,50 2~.30 1.2~ ~,28 3,39 33,79 1.12 9322.50 29.45 1,42 ~,23 3.75 29.96 l..P2 9323?.50 ....... 52.28 .... 1.B3 ~.98 4.16 46.55 1.~5 732~'00 ~'~'85 ..... 3.'iB ..........~'.~'i 8.17 75.77 3.20 5.0~ 3.3~ 4.75 3.25 5.05 ~.79 2.53 5.00 2.67 5.13 2.8~ 5.23 2.99 a.72 ~.70 3.99 2.5~ 3.24 2.45 ~.76 2.68 2.51 2.83 2.31 2.88 2.~ 2.64 2.61 2.77 2.59 2.9~ 5.40 ~.71 4.6~ 5.7~ 5.13 4.05 5.6~ ~.67 6.0~ 5.0~ 5.8~ ~.81 2.~1 4.31 4.40 3.42 ~.75 4.9a 4.92 PAGE 2 ATLANTIC RICH~'ZELO .... DS PRUOHO.F. BAY .... NORTH SLOPE', ALAS:<A O A T A E V.ER Y I S A~,,PL,£.S 9-6 9325, 9.3,2,,7 · 00 6 ~ 0 3 7 i IH] TC2 .95 72.12 ~! !2.,83 '38 I2.91 .62..97 t 933: 0 55 1.49 3 34 2.93 3.07 2.6.3 0 87 57.18 2.n3 1.7n 1.60 1 759 1.47 1.39 1.28 ,!.16 1.25 l,q-B 1,72 1.B1 l .65 1.07 0.9,'5 0 83 0 5 15 8.92 2:5,05 0.85 9337.00 2B.O .00 4, rjr 2 THP = 54 5.93 ,, . 6.3R 7.52 7.5R 8,39 7.36 9.2S 6.08 lO.6,B 6.,21 10,R5 %,B4 lO,g9 . 5.~4 10,9~ q. S1 10.12 ~.28 ~.95 7.9~ ~.?0 6.35 ............. 4.57 5.,~2 ........... ~.72 5.R5 4.78 6,7~ .............. 5.10 7.65 5.38 5.17 10.01 5.00 11..~.o ........................ 5.3~+ 11.60 93 5.13 2 4 .~? 1.00 5.27 11.02 ~'--:~' ? ...... O0 934 0 ........ ~..~.~ 1,79 o. ~:.s.~. ~::,.zz~,~.~...~? ~2~:~. :<~; .00..... ~.!... ~ ~ 25.65 O' 0 ~ ~ 73 5,24. 3,99 22,26 7~ ............ : ~",'6"~ .................. ~','~ .................. 93~ O0 2; 0 3,O& ~.lB 22,28 ~'~ ~:"i-6-' ..................... ~"~'~'~ .............. . 17 ~ , ,..0~ 9.3.~7 ..00 25 . ~ 0 , 4 ~ 2 3 . 75 ~,9,5o ~,~ ~ ............. 9350,_0.0 ......... 52.26 _ 1.60 ~.3~ 5.76 ~5o.5o 5~.7~ ~'":~'~ ............... ~ :"g'6~"'~'-'{ ~ :.14 02 47 0.42 0.98 O.BO 0.67 0.65 0.66 0.67 0.~4 0.96 .0,9~ 0.80 0.82 0.~4 0.91 1.11 1.27 1.46 1.72 1.96 4,B~ 4.33 3,90 4.15 3.59 3.8a 4.15 4.17 4.71 6.50 5.13 7.9~ 5.5~ 9.55 5.~ 0.4~ 6.08 1.03 5.75 0.31 ........ 5.2O 7.67 4.60 4.67 3.7~ 4.750 3.40 4.05 3.~6 4.15 4 0 ~ a ~ 5 e 4.20 ~,15 3.79 5.R1 ..... 2.92 4.1B 2..77 5.6B ..... 3,72 3.69 ..... 3.87 3.76 3.96 4.06 PAGE 3 ATLANTIC RICH~'IELD .... D~ 9-6 PRUOHOF BAY .... NORTH SLOP~:, ALAS<A DAI,~ EVERY I...SA.Mm.LES 69 2 1 955~.50 69.63 955g.00 69,68 TC2 9 71,35 72.78 8,95 72,93 1.1,08 71.87 11.69 71.22 955~,50 69.85 2.19 5,57 11.5~ .... 71.12 9355,50 70.~0 2.26 7.80 11,1~ 71,57 9356,50 69,0~ 2,22 7,28 12.02 72.92 9357.50 6~.11 2.54 7.28 13.03 68.70 9358.50 ~'$'5"6',"06 5g;i"$ ................. ~:;i<$ ........ ............. "g;'4~:~~ I$;"~2 ~.'?~ ~.~ 9359,50 55.49 1,~5 6,35 13,60 57,gl 9360,50 ~7,78 1,53 7,83 10.69 51.~2 9361.50 3~.82 1.72 7.92 8.05 36,95 9367.50 23.98 0.90 3.38 ~.6~ 28.~6 9368.50 23,11 0,9S 3.55 ~.02 25.73 1.01 2,93 ~.00 25.51 0 97 ~,09 q.39 2~.68 . o.s7 a.55 5.oo 22.5~ 22.50 0,98 2, ~=o ~. 32 2~.19 2~,18 1 2 ~.18 22.96 _.2~,60 1, ~ ~...,.98 23.34 9369.50 23,92 9370.50 e2.qo 9371,00 21,4+5 9373,50 937~.00 937~,50 9375.00 9~75,~,.0 9376.00 ~2 2.15 2,27 2.B9 2.5~ 9.69 2.84 2.48 2.43 2.57 ~.67 2.77 2,q3 2.11 1.B5 1.80 1.28 1.06 1.07 1.16 1.35 1,~5 1,51 1.50 1,~0 1.77 t.].6 0.95 0.81 0.61 0.~? 0.69 0,79 0.~ O.g7 0.93 0.80 0.77 0.55 0.9R 1.09 1,1.0 1,03 1.02 1,10 1.!? I,IR2 q-.81 6.24 7.51 8.27 8.96 7.53 6.5~ 5.25 6.21 7.65 6.79 5.~9 6.01 6 .~7 6.98 7. L~]. 8.16 8.6~ 8.85 9.55 8.71 5.9! 5.~ ~.8~ 3,56 2.8.0 2.97 3.g.q 3.09 2.26 ~ .99 2.on 2.49 ~.00 ~.25 3.6! 3.61 3.65 3.B2 3.0~, 2.70 2.55 2.~5 2.33 2.35 2.42 2.50 TH2 5.~5 5,9B 6.7~ · ~.19 9.42 30.06 10.9~ 12.~ 1~.31 !4.91. · 13.95 3.3.30 ~3.97 3~.~5 14,9~ 14.89 10.2~ 9,22 5,87 5,?0 5.70 6,77 7.53 8.15 8.55 ~.10 7.5~ 6.a~ ~.1~ _. ~.?O ~.65 ~.71 ~.A5 4.01 3.97 M.77 3.65 3.75 3.82 PAGE ~ ATLANTIC RICHFIELD .... DS ?RUDHOE BAY .... NORTH SLOPE, ALASKA OAT, A...,E.V. ERY I S..AM~.L:ES 9-& 9,,3.7.8,.°,.0..0 .......... ~8. 9378.,.50 63.. ) { 9,,~.,80,00 67 9~80.5.0 ....... 65: 938 9382,00 5G 63,00 69 ~0 11. ~7 56.,99 3 7 $ 91 9.~_8 "9.7~ :l.17 938 ~1 ~ 9~. ~,, 25 . 8.77 ._~ G. ~._8._~ ..... 8 31.98 1,58 ~,19 ~.0~ ~1.51 1.ff9 oo 2~.~ 0.~ 5.~0 ~.05 ~5.~ 0.9~ S6 ........... '2~ ;'"~ ~ ........... 0'";'9:6 ................. '5:~'~'~'': ........ :'~:i'~S'~' ............... -~d'";~g'~ ............ 0.99 0.73 9B95,00 23,17 0 82 2,97 ~,09 2Beg9 0.77 939~,00 25.5~ 0.85 5.25 ~.g6 2G.G~ O.R9 '~"~'~"~ '""5 0 .......... ~-~ ~'~ ........... 0""2 ~"9 .... ~--2'~'f'':-'-': ....... "-~"'~ ~"~ ........ ~-6'-''~''~ 9395.00 31.6~ 0 95 ~,70 ~,02 5~.2~ 0.99 9~96.00 ~1,75 1.03 ~,~B 2.B6 ~O.GG 1 25 9 s9~. ~o~ ~ :"f~i~:iO '~2'~ ~ :'~"~ ............. ~S'''°'° 9~97.00 ~9,~2 1 18 5,~ ~,70 a6.73 9598.00 59.~7 1.59 S.l~ 3.09 55.20 1 939~'00' 2~'~3 0.79 2.75 ~,21 ed!?~ .......... ~;~92'2"~0 ......... 22'-77 O.BO 2.86 ~.15 23.02 K2 UP2 1.09 2.5q 1.16 2.72 1,24 2.98 1.q9 3.27 1.92 ~.56 2.27 s.9? 2.~9 2.48 4.62 2.52 5.09 2,23 s,~O 2.30 5.90 2.57 6,28 2,29 6.72 ~.10 7.22 6.90 5.82 5.15 q.97 5.57 6,96 7.06 6.50 5.06 2.91 3.0~ 3.13 3,11 2.91 2.68 2.63 2.99 3.36 3.6~ ~.S9 3.15 3.64 3.75 ~.97 q.18 ~.67 5.09 5.79 6.09 6.05 ~.10 TH? 3.65 3.65 ~.05 4.65 7.17 9.57 0.87 .... q.77 . 3.35 2.q5 P.~3 ....... ~.~? 2.3~ 0.8~ q.85 8.92 7.91 g,77 5.69 4.OB 3,~2 3.13 2.95 2.79 .2..79 2,8~ B,G? . ~.0~ q.19 3.5W . 3..P-~ 3.25 ~,69 4,87 5.60 Company, ARCO ALASKA INC, i,,J~;l 1 DS 9-6 CH.~CNS Fimld PRUDHOE BAY C,-~ u n t'..' NORTH oLCPE St..st e ALASKA Country,., CL,.IENTFORMAl' DATA TAPE LOG I NFORMAT I ON STANDARD F O F,: M A T ( T~2, PE REF'~,' ,~ ... HEADER RECORDS D .~ t m ' 8 4 / 0 5 / 3 ~ 0 r. i g i n: R e ~: i r': ..:~ m e: 2 8 i 7 9 0 Cc, m men t ?..,: S ,,z r. ':,' i c ,:_ n.~ m ~: & G 5 F 0 ! 8 4 / 0 5 / $ 'i 0 r' i q_ i n; T a p. e.: n a me.'.: 2 8 1 7 '..~ ,.,n Co!-','binu.at. ion ~' 0i C o m m ~ r"~ t s: i"i.~>::imum ienqt, h: ~024, HEAl)ER RECORDS Fii~_ t,..,pe.,. .: LO Prmvi ous. f'i H N E M C: 0 U N S TAT C'! R V 5 E L; I ! ,.., b., F: E K 8 t:. L) I- L H F D i"i F LCC L. U Fi LU L E N G ~ TL,_'r E:Li 'T C o 'TL A E; H R T i"! V I S P H {:;;: i"i F H F S T i','~ ~,' :T' C: i ! ~. ._. i:;.; i',i C i'qi iH i M C :--; :.:.; ~ H F 0 R H A T i 0 iq REPORD,=, U N i T FT L) b: G ? E:, E *..1 F' ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 0~000 O:O00 ................................................... O. 000 ................................................... LI i-i F'! f'! 0 H t"i ~'i L)ttj? TYPE C A T G Sl ZE ,4 0 ~ U ',..-.:: U 2'. '''~ ;:2 3 :Y ,..i. q:. 2: '..2 i 0 i() 2 0 4. .-... 4. i :2 4 .4. C 0 )} E F' a g e C: 0 H M E N T R E C: 0 R D c. This L. iS tape ~.~a..s ~,.,rit.'~..en by Gmarh. ar't indu:~tri~s t. dir.~iine S~r'vic:,~s, :~+, Gmar. h.~rt, cur-v~ and tool mn~zmor~ics, :~:+: :~: :~: H~ :~ ~ $ ~ :.~ ~ :~ :~ :~: ~ :~ :~ :~ ~: :~ ~: ~ ~ ~ ~ :.~: :~ :~ ~ :~ :~ :~ ~ :~: :~ ~ :~ :~ :~ :~ :~ ::~ :.I~ ~ ~ :.~: ~ ~: ~ ~: :~ :.~ :~ ~ :%: :%: :.~ :~ ~ :~: :~ :~ :.t-: :~ :~ :.t: :4,; :.~: :~.: ::i~ :~ :~ :,t.: :~ :~: :~: :to :~c :+: GEARH¢:P.T TO SCHLUMBERGER MHEM SERV iCE UNIT HNEM C, ~'; P T H F E ~ T [:, E, P T r:; i'.¢: f"l C P ,-' ¢::~ i:, i' C iD L. H C P M V C C L r..:. c- i'-.~ SI'd :': P ,", p c: ,,.c,"- ~..~. :i . . C i'..." S S i"I C P ?-' '.:: A f--': {:.': i'~ P H i o ,-., T C O h! r.:, ~; T F K'.. R ;a T c. r..- ~ V I C E: U i',I I T FT CF: c:. CF'S PU E N T R Y FORMAT TYPE._,° l ZE S CA P E C I F I C 0 D E T l tiN,:, :.=;EP. Vi CE SE.K.:Vi C:E Hi-~Ei'~ i L":, ORDER ~ R P :.i:. A P ! A P :f. A P i F' I L E i" L.. 0 (.:: 'T"," P E C: L.¢~:.:.'; S H.' iD [:, :N: [:,EP T ,..'"C:L F '-' N~ ki r. H L 0 0 0 0 '" ,.,'" 31 n. ,",,., :,,", '"' 0 0 F~ 0 0 0 ,", F,, 0 f". 6 S '::' 0 0 0 0 ii: 0 0 !'~ :", Fi iq P R C: ~ Si'ZE : ',.-.'~ SHF'L RLq P R 0 C E ::.:; S i N i::::: :'-: A T 0 R S 94-37 '"'00 o7,600 ,0(,0 48i.,008 54.8..500 oq -- , ,,., .-. = ....,."~ O i i40 25, OiS m: R i L E R f'~,ix t '¢ i i ,.z: HEABER Pr.,i:v i c,u s ¢i C T R Y S E C T T' 0., F.: K.:~ i'-i C: t. L:"-P E G L ~.:' i.ii S C: L U H Fi LUL E N G i i4 'i' "i" ~'-~ * I'1 i::: {> ©L L~ i:D ~ T 'T' F'- '!" L ¢~ F_:i E:,;: . H R "[' i'-i T i',i 8 S i'/, i. ,i T R i',i I',.i I! i"i F S T M F S L:; R i"i C H C' S T >i C S :ii; i N F'O R H A T Z 0 H R E C 0 R ARCO ¢~L. ASKP. ....... ~--6 P R U [:, H 0 E B A Y NO R'l" H q L 0 P E ~ t. ¢:! U K i :S__.F 52, 000 .................................................. ! ~,.. no0. .................................................. K. tl : i..,fl.. 72 08 i'.~npT~ SLOPE HUPP H 0 R :3 T 9 i 0 0 ~ O 0 0 ................................................ 9525,0 0: 0 0 0 ................................................... i'~ OhO i 9 n_, ..,n ,.,n 0 ................................................. 'i 90, 000 ................................................. ~..[ L.~ ~_ U, U U U 0. 0 0 ;]: . U H fq fq [:: ~.:. :_: 0 4 0 6 5 0 4. n ,~ ~' 0 4. 0 65 .., " ;.2 ~] , 65 0 2 0 ,:, =:._, 0 2 0 :S 5 0 S 6 F; 0 ~ 65 · 'ii 4- 68 · '}; 4 6 ::3 · 3 4 68 .'.< 2 65 -." 2 t:, o 0 '2 7 9 fi 2 fJ ,:: g 0 20 65 0 '20 65 S 4 6 8 S 4 6 8 .3 4 6 O 7.; ".i. 6 8 2 4 6 8 4 4 6 R i 4 6 8 i 4 ,c. 8 '":' 5 n ~-, ":' ;E 0 6 tl 2 .w"i f::,_ IZl_ ;'2 4 6 R ';'. 4- 6 ',:: '--.-2 i 2 6.5 2. 4 6 8 2 4- ,_'::, R _ 2 i 2 6 5 C:OMMENT' REL.©RDo This L.I':'..: t. apa ,,, .~ :--....w~..-it, tan a~:ar-har, t cur. va .and tool ~neaonic~, i :2 0 T ~-_.- r' m i n a t. o ~ ..... -':: n o m o r' ~: ,~: r',..i:, r' :i. ,== :-_-, ) F 0 R M A T 5-' , P .~,PEC i F l .,A ........ :~, E C 0 b E 0 I 66 DATA FORHAT oPE [:' E P T 28 1 7 9 C: L': L. 28 i 7 9 N C H L. ="; ,., '=' 1 ..... ," '~ Fi: ~::~ T 2.9 ~ ..... 0 F T 0 O 0 0 0 ..,n :'U: ..,,", ~-;A .7; ..,n i. 0 GAP i 0 3i 0 0 i 0 MY 0 0 0 0 ! 0 L-; F' S 0 0 0 0 r, C F'° 0 N r, N 0 0 O. O. ..,'" i PR!_'.' 4i LYL SHPL RC 4 0 i 68 4 0 I 6 ,.'3., 4, r, i e', S 4. 0 ' t & o 4. 0 J 68 4 0 i 6 c:, 4 0 i 68 00 '",., O, n....4 00000 O ~]. f'~. 0 :'::. 0 :"~... NFi,"OOr' NOr, O00 r,n:]N,",O 000000 000000 000000 ' '. ¢. r; n n n t"l i"i .... n ,-, ' U U ..f ,,. ,.: ,.,f} .... ,.:n :: Fi.. ,...~ ~ U U :., ,.., I_I 000000 000000 000000 r'nNONO ":NO000 0000'"'0 000000 OOf::O00 000000 [) A T A R ES C C1 R D '=' RAT 4 0 .. 4 8 0 0,00 0 i: S 51 24,6 0 0 040 · i ,. 094 o ';, ":,' F"i 0 I] P. 24,3 0.. 612,600 I ri 'P 92 ;':i':5, 000 i 3,26 0 28,800 , i90 889,200 8.'02,500 3P, Fi?n , 04.0 ,,._.0 ? 0 TRA I LER Ne:.,.::t f'i la ~ EOF I ? l N F Ci R H A T Z 0 H i l i',i T T T '¢ F' c' U H P! L) I= 1 .= i- S ;i Z E C 0 C, E 0 0 4 0 6 5 u 0 2 0 6 :-']; 0 0 2 0 :S !":; 0 0 '~i'. /.:, 5 0 0 3 6 5 0 :Z 4 6 8 0 :7, 4 6 0 ¥ 4 6 S O ;"1 L:.: 6 5: "" 3 2 ~:': 0 :::: '2 FL F; '" 0 2..': '? 9 () u 2 "~ ": r, n i f) ,'~'] b 0 0 i 0 6 5 0 () 2:,'" 6 5 0 0 2 0 :::, 5 0 fi ':3 n z .=. 0 0 :-2 0 ::.:, F; 0 ,3 4 r:, 8 0 .-_:': 4 6', 8 0 .'.:: 4. :::., F3 0 S 4 6 S 0 2 4 .:: c, 0 4 ,:i 6 :-", 0 i. 4 6 ,.. c: 0 i ".i- 6 F: 0 ;2 ::2 0 6 5 0 2 2: :": 6 5 0 :2 4 6; 8 () 2 4 :S 8 0 2 4 6 ',--: ii ;~ i :--': ': ~ 0 2 '4 E, ~--; ili 2 i 2 6 5 C: O., H M E H T R El C O, R D c...; DATA TYF'E DESCR i PT' i 0 i".l FORMAT .... "' E Z E I 'r ~ S i U U k:, t':.:. 0 ! 66 D Ta SER',/:'iCE SERV I CE i',i i',! rE; i~'! .i D 0 F,'. [) E R ~ AP UH..~ 'f.' LO Al::' i ~qP i AP i F i LE T"'r' P E C L. F~ S $ H O l) ~ P RE; ~. S;iZE LVL ','-3HPL 4- iD t 4 .0 ,4. 0 i · .~ ~'i 4. 0 i 4 0 i 68 68 68 68 68 68 ,':'i a x i m u m i ~ n g t. h: ~ 0:2 4 TRAZLER N cz x t ,F' i I e;: il 000000 ' 7777777777 ' 000000 ' 1777777'177 I 1 000000 7777777777 000000 '?'177777777 ] 111 OO 00 7'7 O0 O0 77 1 i 11 00 O0 77 00 O0 11 O0 0000 77 O0 0000 77 11 00 0000 7'7 O0 0000 77 11 00 00 00 '? 7 00 0 () 00 77 1 I O0 O0 O0 77 O0 O0 O0 77 !1 0000 O0 77 0000 O0 77 11 0000 O0 77 0000 O0 77 I 1 O0 00 77 O0 O0 7 l 11 O0 O0 7'7 O0 O0 7'1 111. 1 I i 000000 77 000000 77 111111 000000 77 000000 77 660606 000000 222222 44 4q 000000 66666~ 000000 222222 44 44 000000 66 O0 O0 22 22 44 44 O0 O0 66 O0 O0 22 22 44 44 O0 O0 66 O0 0000 22 44 44 O0 0000 66 O0 0000 22 44 44 O0 0000 66666066 O0 O0 O0 22 4444444444 O0 O0 O0 66666606 O0 O0 O0 22 44,44444444 O0 O0 O0 66 66 O00O O0 22 44 0000 O0 66 66 0000 O0 22 44 0000 O0 ~6 bO O0 O0 22 44 O0 O0 66 66 O0 O0 22 44 O0 O0 666~66 000000 2222222222 44 000000 666666 0000¢)0 2222222222 44 000000 *STARt* USkR PCAL [10707,60240J dO~ SHiP 55t4. 736 DAI~k, 06-NAI~,,BO 14:48:53 M[,)NI'['['.IF 5w5 KLIOLi3"~ JiJi_,-~9. *START* *START* t~SgR PCAL [I0707,~0240J jlib 5HIP 8L~. 730 DA'fL O6-MAR--80 14:48:53 Mf]i',IIT(3E 5v~5 k[_,10k, 34 JUL-19. *8IART* 111111 I i i I t 1, ii I I II II i1 II II II II IL I iiii.[i I I i I I I PPPPPPPP PPPPPPPP PP PP PP PP PP PP PP PP PPPPPPPP PPPPPPPP PP PP PP PP PP PP ,,.SI'AR'l, USER PCAL [10707,60240] ,10!:5 StilP M(JNITi)R S~S KLlOE34 dUL'']9. *START* f"II, E: DS~H:SH1P.~FO<255>[~0707 602401 C~EA'rgD: P~INI'ED: 0~-P!AR-80 1~14911.0 ~UEUE S~t~i'ChE8: /P"ILE:FORT /Cf~PiES:I /SPACLNG:I /L1MiP:llO /FURMSII~ORiqAL SE(}. 7]6 DA'rE 06-MAR-80 06-MAR-80 14:3.~:40 .1 4: 48: 5 3 VEN'rURA ~ PCCC SHIPPING 1NSTRUCTI[INS ISSUED ~)-IqAR-,80 ~ 4: .5.,~ CALZIFO~mlA PCCC IIIII1 iiiiii I1 II Ii II ii ii 1i ii Ii II IIIIii liIIII YY YY Y~ 000000 000000 44 44 000000 000000 44 44 O0 O0 O0 O0 .44 44 O0 O0 O0 O0 44 44 O0 0000 O0 0000 44 44 00 0000 O0 0000 44 44 O0 O0 O0 O0 O0 O0 444444,44 O0 O0 O0 O0 O0 O0 44q44444 0000 O0 0000 00 44 0000 O0 0000 OO 44 00 00 O0 O0 44 O0 O0 O0 O0 44 000000 000000 44 000000 000000 44 o~4 44 *$TAt.~'I'* USER PCAL [10707,602401 ,,JOB MONIT(IR SWS KLIOE34 dUL-79. *STAHT* ~IbE: i)S~H:VERiF~.004<057>[10'/07.60240] CREATED: PR1NTED: 06'MAR-80 14:49:27 QU~Ok ~].'ICHES: /fiLE:PORT /COPIBS:i /~PACING:1 /blMIf:110 /f~URM~:NURNAB DArts 06-MAR-80 O8-~AR-80 14:47:qb 14:48:5~ SCiibU~4BERGER CONPUTING CkiNTER 10707,60240 EhEL iiEAD~Iq LENGTH: I.]2 D~TES ~EEL .NAME: P.C.A.L. SERVICE NAME: EDIT EE;E, Ia CONTi. N[JATI(~N NOMinEe.: O1 PF:EVIOIjS ~EEL NAME: COaMEmTS: bls FORMAT CUSTO~4ER TAPE DATE: 80/ 3/ ~ TAPE HEAOER LENGTH: 132 ~XTE8 TAPE NAME: b02.40 ~ERV1CE NAME: EDiT T~PE CfjNTI~NUA'I:ION N PitEVlOi.lfi 'rAPE; NAaE: DATE: 80/ ~t b FI6E I.,hNGTH: 62 ~ ~f'I;EM FILE, NANE: hDIT .001 NAXlMdF-', P.H~[SICAL RE;CURD LENGTH: 1024 BYI'L5 PRP, VlO0~ FILE [,iAtqk: TM[5 bILE CONTAINS THE TH~.EE PASS CASED HOLE ca6 RUN [JN 20-JAN-80 wE, LL 511:E 1N~[JIqMA:[I[]I'~ ~ECUF. O I.,kNG I:H C[J~iPAN~. WELL: FI~2LD RANGE SEC%it~N STATE 180 Mi'I?ES ATLA/~TIC RICHFIELD CtJ. D .$. PRUDHf)E bay 1 1ON 1 N. ~L£]P E AbASKA 0 SIZE ~E[' CUD~ ~NTHY 1 6~ 0 DATI]iq SPEC,IflCAI'It]N Bh[)CK$: ENTRY lC T(]OL SV(JRD~ UNIT8 APl APl A?! AP! FILE# SIZE E×P PROC SAM REP DEPI' SHIFT ~'T 0 0 0 0 0 ~i 0 0 I b8 0 0 GAP1[ 42 31 32 O 0 4 0 0 1 68 0 0 PO 42 68 3 0 0 4 0 0 1 b8 0 0 C/C 42 42 1 0 0 4 0 0 I 68 0 0 CPS 42 ~4 92 0 0 4 0 0 1 68 0 0 CPS 4:2 34 9.3 O 0 4 0 0 1 b8 0 0 GAPI 42 ~1 .~2 0 0 4 0 0 1 68 0 0 PU 42. 68 3 0 0 4 0 0 1 08 0 0 C/C 42 42 1 0 0 4 0 0 1 68 0 0 CPS 42 ]4 92 0 0 4 0 0 I t~8 0 0 CPS 42 ,]4 9] 0 0 q 0 0 I 68 0 0 G A P l 42 3 l 32 0 0 q 0 0 I b ii 0 0 P ti 42 68 3 0 0 I 0 0 1 68 0 0 CtC '42 42 1, 0 0 ~[ 0 0 i (',8 0 0 CPS 42 34 92 0 0 4 0 0 1 08 0 0 CPS 42 Iq 9] 0 0 ~t 0 0 1 bi{ 0 0 DLPTM 9600.000 9500.000 9qO0.O00 9'~100. 000 9200.000 9100.000 ~000.000 8900.000 cqiqE;MON lC GR F C N L N C N L NEAT VALUE MNEMONIC VALUE -999.000 NPHi -999 -999.000 GR 0 0.000 E'CNL 0 -999.000 NCNb -999 (;R 34.500 NPHI 22 ?CNB 131.70:] GR 36 NCNL 1:t39.768 ~CNb 139 NRAT 2.298 NCNL 332 GE 76.200 NPHi 30 FCNL 145.002 GE 88 NCNB 349.20b ~CNb 144 NEAT 3.090 NCNL .335 NCNb NEAT 20.900 121 .407 O28 97.800 176.748 232.947 3.5O4 GE I~'C N b NCNb NEAT NPHi 21 (;R 25 [;'('. N b 12 4 NC ND 320 NPit I 19 GR 91 FCNL 62 N C N b 228 GR 137.300 NPHI 15 P'CNi, 211.497 GR 124 NCNB 264.264 FCNL 78 NEAT 3.302 NCNb 265 MNEMONIC VAb0E .o00 NEAT -999.000 .000 NPHI 0.000 .000 GR -999.000 .000 PCNL -999.000 .260 NRA'~ 2.378 .800 NPHI 19.040 .854 GR 43.000 .904 FCNb 133.848 .740 NEAt 3.178 .000 NPHI 130.300 .144 GR 79.200 .049 F'CNL 138,996 .40o :glO G" 23.400 34 [;'CNb 123.552 MNEMONLC VALUE NCNb -999.000 ~RAT 0.000 NPHI -999.000 NCNb 328.185 NEAT 2.408 NPHI 19.220 NCNb 348.77'1 NRA"t 3.128 NPHI 32.200 NCNb 306.~05 NEAT 2.512 NPHI 21.780 .080 ~AT 2.~54 NCNb 413.985 .700 :NPHI 43.100 NEAT 5.654 ,634 GR 98.500 NPHI 40.960 .228 FCNL 63.492 .520 NRAI 2.112 NCNb 488.202 .300 NP~I 32.400 NEAT 3.354 .50'7 GR 132.000 NPHI 33.480 .980 ~CNB 70.362 GE -999.250 NPHI -99925.000 ~CNL -999.250 GR -999.250 NCNb -999.250 ~CNL -999.250 NEAT 0.000 NCNB -999.250 -999.250 NPHI -99925 -999.250 GR -999 -999.250 ECi~B -999 -999.250 NCI~L -999 i:~AT 2.32~ NPNI -99925.000 GR -999.250 ECNL -999.250 EC NL NCNL NEAT .000 NEAT -999.250 .250 NPHi -99925.000 .250 G~ -999.250 .250 ~CNL -999.250 NCNb -999.250 NRA't 3.618 NPHi -99925.000 NCNB -999.250 NRA£ -999.2b0 NPHI -99925.000 t,~ENGT,~ O1~' bAST tRECORD: 390 BY'I;E8 F]LLE T IRAILER bENGI;H: 62 B'Y TES PILE NAIVE: EDIT .001 NAXINUM PHYSICAL RECORD LENGTH: NEXT [~'I.BE NAN,: 1024 BYTE8 IF[LE HEADEP. LENGTH: 62 BYTES ~' I L~.; i~iAME: EDiT .002 NA.,X.I~tJIX4 PH~YSICAL F:ECORD LENGTN: 1024 BYTES PRE~IOU8 Fi.BE NAMEI Flbg C[)MMENI'S THIS ~.ILE CO~:AINS THE DIGITIZED DATA P'Rt)M A.~ ~IPEN HUbL LUG RUN (i,q B-AUG-Th SiTE INPO~:MATIU1'~ E?,CORD ~ELL: ~ IghD: RANGE: SECT/O~ C()[J N'] ~ STATE: A:rLANIlC RICPII;LELD CU. D.S. 9-b PRUDH{J~, BAi 15E 1ON 1 N. SLfJPk, AbASKA DATA [,':rjRIV~AT' ,5I?gCiFiCAI'iOi',I P,';N'I'RY BLOCKS: 0 SIZ[; REP CODE ENTitY 1 66 0 DATll,M PILC i [:;~ IC AT i, Llr't I C T Q [] L. 2 G~ C~,b DPBI CNi~ SVt,JRD~ UN1T,S Af~I APl AP1 AP'I Flhg# ,SIZI: EXP PlqOC SA~ REP I)EPT 5MIlleT F~T 0 0 0 0 0 4 0 0 1 OB 0 0 GAP1 ~2 ]1 32 0 0 4 0 0 1 68 0 0 IN 42 28 I 0 0 4 0 0 1 ~8 0 0 P(] 42 68 3 0 0 4 0 0 I ~8 0 0 PO 42 68 11 0 0 4 0 0 1 68 0 0 9600. 000 GI~;~ 126,438 C.AbI 8,555 M N E M [] N 1 C V A b U E N P H 1 33 . 344 NNENOt-' 'NIC VALUE DPH! 0.240 9 5 0 0.0 0 0 CALl 8 . 477 NPHI ,~0.109 DPH, I 24.109 940',). 000 1,22.875 CALl 8.516 NPHI 35.125 DPHI O. 120 9300. 000 19.750 CAbI 8.594 t'~PHl 30,109 DPHI, 24.469 9200,000 9100.0 00 9000.000 8900.000 G~ 120.500 190.000 198,000 GR -999.250 CA~i 8.758 NPH 1 50.438 DPl, ii 8. 059 CALl 8. 758 NPHI ]8.'719 DPHI 0. 240 CALl 8.797 NPH1 49.094 DPHi 15.359 CALl '999.250 NPHI -999.250 DPHi -999.250 LENGTH OF RE, CUIkDS; 1006 BYTES LENGI'H (._!1~' LA;ST F!ECt. JRDI 26 B~la8 FiLE i~ A.~i E;; EDiT .002 NAXI~U~ PHYSICAL RECORD LENGTH: NEXT ~I, LE 1024 TAP~] TRAILE~ LENGTH: 132 iJYTES TAPE NAME: 60240 SERVICE NA~E: EDIT TAPE C[}NTI~UATILiN NUtqi~RR: 01 NEXT ?~'APE ~'~AMi~: 80/ _{/ b