Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout176-057 • • PTD /76-05-3 Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Tuesday, February 23, 2016 9:58 AM To: 'Sternicki, Oliver R' Cc: Lastufka, Joseph N (Joseph.Lastufka@bp.com) Subject: Suspended Clarification PBU 03-05(PTD 176-057) G-03A(PTD 197-070);Y-08A(PTD 188-056) Oliver, The wells need to be brought to a mechanically sound condition with plugs in accordance to 20 AAC 25.112. A surface plug may not be required at this time if the wells are otherwise mechanically sound. However,these wells must be included in the development of a P&A plan for suspended wells with no future utility that must be approved through the Commission by 12/31/16. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer APR �e� 1�D Zo 16 State of Alaska + Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(cilalaska.qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov From: Sternicki, Oliver R [ nailto:Oliver.Sternicki@bp.com] Sent: Tuesday, February 09, 2016 3:20 PM To: Loepp, Victoria T(DOA) Cc: Catron, Garry R(Wipro); Lastufka, Joseph N; AK, D&C Well Integrity Coordinator Subject: Clarification Request: Well status change to Suspended Victoria, In reviewing our Not Operable well stock I came across 3 wells that we would like to convert to suspended status. I need a bit of clarification on what we need to do to change them over. • 03-05, PTD# 176057 o Failed RWO in 1991-Tubing pulled, EZSV with cement cap set in the 9.625" casing. For some reason this well did not have a PT in 1991 when the rig moved off of it. I assume that if we apply for a suspension we will need to get a PT. o No future utility • G-03A, PTD# 197070 o RWO suspended on 10/25/06 when the rig found holes in the production casing between 5262-5291'. A EZSV was set at 5096' and a 4.5" kill string was run to 5015'. o PT passed to 3500 psi on 10/24/06 1 • • o No future utility • Y-08A, PTD# 188056 o This well has a P&A sundry open (314-595), but we are unable to close it out because we have not been able to get a PT on the cement job that was performed in late 2014. TOC was tagged at 8597', but there is a tubing leak at 4390' and a production casing leak at 2700'. o No future utility Please advise on what is required for each of these to get them moving towards SU status. Regards, Oliver Sternicki ItACO Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternicki()bp.com 2 CIW _ it • G-03A SA NOTES: ACRIATOR= -- OTIS SHUI IN OKB.t3EV= ___---61.5 BF.REV= 34.26' I = _ 092(7 Max / Max Angle= )5 @ 10922 _"CONDUCTOR, --E---- 11 �� Datum MD= 9131' _# Datum TVD= 8800 SS t3= `� MEMO 2209' -�9-5/8"FOC - 13-3/8"CSG,72#,N-80,D=12.347" H 2675' 11 8188' Minimum ID =2.377" @ '- '- 2719' -�s 5rs"�v COLLAR BAKER XO TO FL4S/STL i f 4995" H4-1/2"FES"X"NF?D=3.813" 4-1/2"TBG, 12.6#,L-80 TC11, -45016` 5015' —�4 112",HUES SFIOE D=3.958" .0152 bpf, I)=3.958" 5096' --(9-5/8"HES EZSV CBP(XX/XX/XX) 11.1. 14011111 9-5/8"CSG HOLES -{ 5262'-5291' o 0 7"TBG STUB(XX/XX/XX) -{ 7769' \, 7"TBG,26#,N-80 BUTT, .0382 bpf,D=6.276" -( 7835' 7836' -7871' -I 9-5/8"X 7"BOT 40'SEAL ASSY,D= " 7875' -(9-5/8"X r BOT LTP,ID=_" TOP OF2-7/8"LNR H 8184' 1 r J 8184' I--(BKRCTLRT W/GS,ID=2.9r 8188' — BAKER XO TO FL4S AND BPX XO TO STL,ID=2.377" 9-5/8"CSG,47#,N-80,D=8.681" --1 8375' —A L 7"SIDETRACK WINDOW @ 8664' 7"LNR,2940,N-80,.0371 bpf,D=6.184" -( -8664 UNKNOWN H ARE LEFT N HOLE PERFORATION SUMMARY ` REF LOG:P MYGR ON 05/14/97 111116., 44%ANGLE AT TOP FERE:80 @ 9550' rr,,yy ,•••1•4 414144/Note:Refer to Production DB for historical perf data 111111 111111 SIZE SPF INTER,/AL Opn/Sqz SHOT SQZ .•/1/1/1/404( ` 1-11/16" 4 9550- 10180 C 05/21/97 111111 �1�1�1�1�1�1 4141111111-11/16" 4 9970-9880 C 05/21/97 2" 6 10600-10770 C 04/29/99 2." 6 10830- 10940 C 04/29/99 4.1*414 1-11/16" 4 11060- 11120 C 05/21/97 1-11/16" 4 11150- 11210 C 05/21/97 PBTD - 11254' i.j`, %iv, 2-7/8'LNR,6.16#,L-80,.0058 bpf,D=2.377' -1 11288' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/31/77 ORIGINAL COMPLETION WELL G-03A 05/21/97 SIDETRACK(G-03A) PE} 1T No:"1970700 11/25/06 N4ES RWO SUSPENDED AR No: 50-029-20221-01 12/12/11 MB/PJC AOGCC RBCLASIFACATION SEC 12,T11N,R13E,2263'FSL&1974'FWL 01/15/14JNUJMD RECLASSIFIED AS"SHUT IN" 07/30/15 PJC CLEANUP WBS BP Exploration(Alaska) STATE OF ALASKA ALA~dKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown__ Alter casing __ Repair well Stimulate Plugging X Perforate Pull tubing X Other ;X Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1183'FNL, 1151' FEL, Sec. 14, T10N, R15E, UM At effective depth N/A At total depth 1469' FNL, 863' FEL, Sec. 14, T10N, R15E, UM 6. Datum elevation (DF or KB) 61' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number 3-5 feet 12. Present well condition summary Total Depth: measured .... true vertical / / Effective depth: measured true vertical Casing ~ Length Structural Conductor " ' - 7 6' ~__ Surface '- - 2682' Intermediate Production 1 0883' Liner Perforation depth: measured true vertical 10950' feet 9291' feet 9. Permit number/approval number 76-57 / 91-15~ 10. APl number, 50-029-20222 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool N/A feet feet Plugs (measured) TOC @ 7395' w/634 sx Class G Junk (measured) Top of tbg fish @ 8624' True vertical depth Size Cemented Measured depth 20" 390 sx PF II 102' 102' 13-3/8" 6281 sx PF II 2708' 2708' 9-5/8" 900sxClass G & 10908' 9280' 275 sx PF 'C' 10306'-10316', 10325'-10334', 10350'-10360', 10370'-10390', 10405'-10430' 8768'-8776', 8783'-8791', 8805'-8813', 8822'-8838', 8851 '-8872' f/ 8644'-10263' Tubing (size, grade, and measured depth 5-1/2", L-80, tbg Packers and SSSV (type and measured depth) SAB pkr @ 10136' 13. Stimulation or cement squeeze summary N/A Intervals treated (measured) (tbg cut @ 8644') ~)' ~C~'~/V~.~~'~1 Treatment description including volumes used and final pressure 14. N/A Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation Service .W=t.c.r ~cctcr- , Date ~/IO/cjl SUBMIT IN DUPLICATE 15. Attachments *Workover Well History 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations X* Oil ~ Gas Suspended · 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed . .i.~ ,.,_ ,?//? Title Acting Re~lional Dri Il in~l Engineer Form 10-404 Rev 05/17/89 ~' ARCO Oil ~.,,d Ges Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Report"Von 'the first Wednesday after a well is spudded or worl(over operations are started. Daily work prior to spudding shoutd be summarized on the form giving inclusive dates only. ARCO ALASKA INC. District PRUDHOE BAY Field A54249 Auth. or W.O. no, ARCO NORTH SLOPE County, parish or borough I State I ADL: 2833~ Lease or Unit WORKOVER / TEMP. PLUG & nma~nO_.k~k/_E~T ITitle J API: 50-029-20222 Well no. Operator IARCO w.i. 21.7800 ACCEPT Spudded or W.O. begun Date and depth as of 8:00 ( U~/UI/~I PB:10828 SUPV:JER 04/02/91 ( TD: 0 PB:10828 SUPV:JER 04/03/91 ( TD: 0 PB:10828 SUPV:JER 04/04/91 ( TD: 0 PB:10828 SUPV:JER/SS 04/05/91 ( TD: 0 PB:10828 SUPV:SMS 04/06/91 ( TD: 0 PB:10828 SUPV:SM$ 03/31/91 ~gnn .ms Complete record for each day reported 1) N/D TREE~ N/U BOPE. Hw~ ~.5 Seawater RIG ACCEPTED @ 12:00 HRS, 3/31/91. R/U LUBRICATOR. PULL BPV. BLED GAS DN. BULLHD 375 BBLS DN ANNULUS, BULLHD 350 BBLS DN TBG. SET BPV. N/D TREE. N/U BOPE. DAILY:S206,648 CUM:$206,648 ETD:S206,648 EFC:$1,280,100 BULLHD SEAWATER DN TBG. MW: 8.5 Seawater N/U BOPE. TEST BOPE. M/U TSA SPEAR ASS'Y. N/U PERF FLANGE LUBRICATOR. BULLHD DN TBG & ANNULUS. PUMP 100 BBLS HEC DN TBG, BULLHD 50 BBLS INTO PERFS. MONITOR WELL. N/U FLOW NIPPLE. BULLHD DNANNULUS. DAILY:S24,755 CUM:$231,403 ETD:S231,403 EFC:$1,280,100 3) P/O OF ROPE SOCKET & WLOH. MW: 8.5 Seawater MONITOR WELL. BULLHD 500 BBLS DN TBG & ANNULUS. BULLHD 100 BBLS HEC PILL DN TBG. MONITOR WELL. RIH W/ TSA 7" SPEAR ASS'Y. PULL HGR. UNABLE TO UNSTING F/ PBR. R/U ATLAS W/ JET CUT. RIH. ATT TO CUT TBG @ 8598'. R/D ATLAS. RIH W/ GRAPPLE. NO PULL TBG FREE. R/U ATLAS. RIH W/ JET CUT. FIRE @ 8638' NO FIRE. NO CAN PULL TBG FREE. RIH W/ CHEMICAL CUTTER. FIRE @ 8641' POOH W/ W/L. W/L STUCK. DAILY:S32,221 CUM:$263,624 ETD:SO. EFC:$1,543,724 POOH W/ TBG. MW: 8.5 Seawater POOH W/ W/L. RIH W/ GRAPPLE & ENGAUGE 7" TBG. NO CAN PULL FREE. R/U W/L. RIH W/ W/L FISH TOOL. ENGAGE FISH @ 862~?. POOH. RIH. ENGAGE FISH AGAIN. WORK ON FISH. i;POOH, RIH W/ CHEMICAL CUTTER. FIRE @ 7954'. BULLHD 400 iBBLS' 8.5 PPG SEAWATER DN TBG & ANNULUS. WORK TBG. NO PSRT. RIH W/ JET CUTTER. CUT @ 7261' TBG CUT. POOH W/ W/L. POOH W/ TBG. DAILY:S35,837 CUM:$299,461 ETD:S299,461 EFC:$1,280,100 P/U 3-1/2" DP. MW: 8.5 Seawater POOH W/ 7" & 5-1/2" TBG. TEST BOPE. RIH W/ FTA #3. DAILY:S32,066 CUM:$331,527 ETD:S331,527 EFC:$1,280,100 RIH W/ FTA #4. MW: 8.5 Seawater TAG FILL @ 7231'. REV CIRC. TOF @ 7247' WORK OVERSHOT OVER FISH. ENGAGE. JAR. PUMP 100 BBLS HEC SWEEP. CIRC. POOH. RIH W/ FTA #4. DAILY:S24,755 CUM:$356,282 ETD:S356,282 EFC:$1,280,100 · · 7 ~j[. ' l~ 9 ~ F°r f°rm prep~ar~t'°l~ and dlstributi°n' JlJ~l see Procedures Manual Section 10, Drilling, Pages 86 and ~7, Alaska Oi~ & Gas Cons. C0mmJssJ0n AR3B-459-1-D Number a daily well history forms consecutively as they are prepared for each wel. iPage no. ARCO Oi, ,d Gas Company Daily Well History--lnterirr In$11%lctione: This form is used during d~,iIHng or workover operStionS, if testing, cormg, or perforstmg, show tormstion name tn describing work performed Number all drill stem tests sequentially. Affect1 description of ail cores. Work performed by Producing Section will be reposed on "tn~ri~" s~eets un,ri fmal completion. Repo~ official o~ representative test o~ "Flail" fo~. 11 Submit "Interim" s~eets when fitled ou~ but not less frequently than every 30 days. or {2) on Wednesday of ~he week in whiC~ oil string is ~I. SuD~it weekly for workovers aha followmg settee pt oil strmG until comple~lOn. District Field Date and depth as of 8:00 a.m. TD: 0 PB:10828 SUPV:SMS/JE ARCO ALA~qKA TNC' ICounty or Parish ........ ~,=c. ISlets AK I PRUDHOE BAY Ar7~ 41Lease or Unit Complete record for each day w~ile drilling or wor~over in progress ~w: ~.5 seawater RIH W/ FTA ~4. WASH OVER FISH F/ 7247'-7649'. NO GO. CIRC. SWEEP. DAILY:S53,744 CUM:$410,026 ETD:S410,026 EFC:$1,280,100 04/08/91 ( TD: 0 PB:10828 SUPV:SMS/JE~ CIRC 9.3 PPG SEAWATER. MW: 9.3 Seawater CIRC SWEEP. POOH. SWABBING. BULLHD 80 BBLS DN DP WHILE POOH. BULLHD 50 BBL DN DP. SHUT IN WELL. CIRC. WT UP PITS F/ 8.5 PPG TO 9.3 PPG BRINE. CIRC. DAILY:S35,736 CUM:$445,762 ETD:S445,762 EFC:$1,280,100 04/09/91 ( TD: 0 PB:10828 SUPV:SMS POOH W/ DP. MW: 9.3 Seawater WT UP TO 9.3 PPG NACL. RIH TO 7932'. CIRC & FINISH WT UP. NO FLOW. POOH. RIH W/ FTA #5. WORK OVER FISH. NO CAN JAR FREE. RIH W/ ATLAS W/L & STRING SHOT TO 7650'. APPLY LH TORQ, B/O. POOH W/ W/L. POOH W/ DP. DAILY:S53,002 CUM:$498,764 ETD:S498,964 EFC:$1,279,900 04/10/91 ( 1 TD: 0 PB:10828 SUPV:SMS RIH. MW: 9.3 Seawater POOH. L/D FISH: 6JTS, 1 CUT JT. RIH W/ RTTS. TEST CSG. RIH TO 7183'. SET RTTS. TEST CSG. OK. POOH. TEST BOPE. RIH W/ MILL. DAILY:S24,755 CUM:$523,519 ETD:S523,719 EFC:$1,279,900 04/11/91 ( 1 ) TD: 0 PB:10828 SUPV:SMS RIH. MW: 9.3 Seawater RIH W/ WASHPIPE TO 7514' WASH FILL F/ 7634'-7668' POOH SLOW. NO TBG. RIH W/ WASHOVER SHOE. DAILY:S38,355 CUM:$561,874 ETD:S562,074 EFC:$1,279,900 04/12/91 TD: 0 PB:10828 SUPV:SMS RIH W/ OVERSHOT. MW: 9.3 Seawater RIH W/ FTA #8. TAG TBG @ 7514' RIH TO 7638' REV CIRC. WASH & ROT TO 7692'. POOH 5 STDS. WELL APPEAR TO FLOW. RIH. CIRC. POOH 5 STDS SLOW. POOH. NO FLOW. L/D FTA #8. RIH W/ FTA #9. DAILY:S35,932 CUM:$597,806 ETD:S598,006 EFC:$1,279,900 04/13/91 TD: 0 PB:10828 SUPV:SMS RIH W/ OVERSHOT. MW: 9.3 Seawater RIH W/ FTA #9. TAG FISH @ 7514'. ENGAGE FISH. POOH W/ FISH (4 JTS 5-1/2" TBG). RIH W/ FTA #10 (HYD CUTTER). RIH TO 7719' POOH. L/D SAME. RIH W/ FTA #11. DAILY:S36,210 CUM:$634,016 ETD:S634,216 EFC:$1,279,900 The above is correct Signet F 'p Stio~ and ~istribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-8 ,' Drilling Supt, Number alt daily well history forms consecutively as they are prepared for each well. ARCO 0~. ~.,d Gas Company Daily Well History--lnterirr Inltll~Clionl: This form is used during drilling or wort(over operations. If testing, coring, or perforating, show tormation name in describing wort( performed. Number ail drill stem tests sequentially. Attach description of all cores. Wort( performed by Producing Section will be reported on "Interim" sheets until linal completion. Report official or representative test on "Final" form, 1) Submit "lnlaril~t" sheets when filled out but not less frequently than every 30 days. or {2) on Wednesday of the west( in which oil string is set. Submit weet(ty for workovars and following setting of oil string until completion. District ~County or Parish | State ARCO ALASKA INC. I NORTH SLOPE Field ILease or unitDs 3 5 PRUDHOE BAY - Complete record for each day white drilling or workovar in progress AUDI ~ Date and depth as of 8:00 a.m. 04/14/91 ( 14 TD: 0 PB:10828 SUPV:SMS 04/15/91 ( 1 TD: 0 PB:10828 SUPV:SMS 04/16/91 ( 1 TD: 0 PB:10828 SUPV:SMS 04/17/91 ( 1 TD: 0 PB:10828 AK Well no. POOH W/ FISH. MW: 9.3 Seawater RIH W/ FTA #11. TAG FISH @ 7676'. MILL & ENGAGE FISH. POOH. RECOVER 5-1/2" PUP JT. RIH W/ FTA #12. ENGAGE FISH @ 7689'. POOH. RECOVER TOP PART OF GLM. RIH W/ FTA #13. ENGAGE FISH @ 7703' POOH. DAILY:S31;555 CUM:$665,571 ETD:SO EFC:$1,9.45,671 L/D FISH & FTA #15. MW: 9.3 Seawater POOH W/ FTA #13. RIH W/ FTA #14 TO 7690'. POOH. NO FISH. RIH W/ FTA #15. ENGAGE FISH. POOH W/ GLM & 246' TBG. L/D FISH, BHA. DAILY:S31,555 CUM:$697,126 ETD:SO EFC:$1,977,226 JAR ON FISH. MW: 9.3 Seawater L/D FISH. RIH W/ BHA #16. TAG FILL @ 7751' WASH F/ 7751'-7930'. REV CIRC. WASH F/ 7930'-7937'. REV CIRC. POOH. RIH W/ FTA #17. ENGAGE FISH @ 7937'.. DAILY:S32,623 CUM:$729,749 ETD:SO EFC:$2,009,849 L/D BHA. MW: 9.3 Seawater JAR FISH. R/U E-LINE. RIH W/ 500 GR STRING SHOT. FIRE @ 8002' (TOP OF PUP JT). MISFIRE. POOH. RIH. FIRE. NO SUPV:SMS 04/18/91 ( 1 TD: 0 PB:10828 SUPV:MWG 04/19/91 ( 1 GOOD. POOH. RIH. SET @ 8002' JARS. OVERSHOT. DAILY:S70,567 CUM:$800,316 SLIP DRLG LINE. RIH W/ BHA. TAG TOF @ 7937' TOF. POOH. RIH W/ TBG CUTTER. RIH W/ WASHPIPE. DAILY:S31,555 CUM:$831,871 POOH W/ FTA #21. FIRE. NO GOOD. POOH. L/D ETD:SO EFC:$2,080,416 MW: 9.3 Seawater COULD NOT WORK CUTTER INTO CUT TBG @ 8042' POOH. ETD:SO EFC:$2,111,971 MW: 9.3 Seawater TD: 0 PB:10828 SUPV:MWG 04/20/91 ( 2' TD: 0 PB:10828 SUPV:JER/MWG RIH W/ BHA #20. TOF @ 7937', TOP FILL @ 7942' MILL & WASH F/ 7984'-8013'. BEGAN TAKE WT ON GLM #6. PUMP HIGH VIS SWEEP. POOH. RIH W/ OVERSHOT TO 7933' TAG TOF @ 7937'. ENGAGE FISH. POOH. DAILY:S34,130 CUM:$866,001 ETD:SO EFC:$2,146,101 POOH W/ BHA #22. MW: 9.3 Seawater POOH. L/D FISH. RECOVER 109'. TOF @ 8046'. RIH W/ BHA #22. WASH & ROT TO 8233'. CIRC HIGH VIS SWEEP. WASH TO 8335'. PUMP HIGH VIS SWEEP. POOH. DAILY:S36,585 CUM:$902,586 ETD:SO EFC:$2,182,686 The above is COrl~t For form~prep;,ration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 I~%%/%1o., . IT'"' ,' Oriiiing Sup~ AR38-459-2-B Number all daily well history forms consecutively as they are prepared for each well. Page no ARCO 01~. J Gas Company Daily Well History--Interim Instroctiolte: This form is used during drilling or workover operations, if testing, cormg, or perforatmg, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets untd finat completion. Report official or representative test on "Final" form. 1) Submit "lltlerim" sheets when filled out but not less Ireduently ;hen every 30 days. or (2) on Wednesday Ct the weel( in which oil string is set. Submit weekly for workover$ and following setting of oil strmc3 until cornDlehon. District ~County or Parish ~State ARCO ALASKA INC. I NORTH SLOPE: I Fieid Ii. ease or Unit DS 3 5 PRUDHOE BAY - Complete record for each day while drilling or word;over ~n Progress AUDI 4 Date and deDtr~ as of 8:00 a.m. 04/21/91 (2~) TD: 0 PB:10828 SUPV:JER/MWG 04/22/91 ( 2~ ) TD: 0 PB:10828 SUPV:JER/MWG 04/23/91 ( 2 l) TD: 0 PB:10828 SUPV:JER/MWG 04/24/91 ( 2 ) TD: 0 PB:10828 SUPV:JER/MWG 04/25/91 ( 2 ) TD: 0 PB:10828 SUPV:JER/MWG 04/26/91 ( 2 ) TD: 0 PB:10828 SUPV:MWG 04/27/91 ( 2?) TD: 0 PB:10828 SUPV:MWG The above ia col~ct For ;~,i~, prePar,,tion and distribution POOH. POOH W/ BHA #22. FISH. POOH. TEST BOPE. MW: 9.3 Seawater RIH W/ OVERSHOT. WORK OVER DAILY:S46,852 CUM:$949,438 ETD:SO EFC:$2,229,538 RIH. MW: 9.3 Seawater POOH. L/D FISH. RECOVER 287' TOF @ 8333' RIH W/ FTA #24. TAG FILL @ 8333'. WASH TO 8331' REV CIRC. CIRC. ENGAGE FISH. CIRC. POOH. NO RECOVERY. RIH W/ FTA. DAILY:S31,755 CUM:$981,193 ETD:SO EFC:$2,261,293 RIH W/ BIT. RIH W/ FTA #25 TO 8329' ENGAGE FISH. FISH. RECOVER 249' EST TOF @ 8582'. MW: 9.3 Seawater JAR. POOH WET. L/D RIH W/ BIT. DAILY:S32,111 CUM:$1,013,304 ETD:SO EFC:$2,293,404 POOH. MW: 9.3 Seawater RIH. TAG FILL @ 8348'. CLEAN OUT TO 8454' REV CIRC. CLEAN OUT TO TOF @ 8582'. PUMP 50 BBLS HEC & CBU. PLUG DP. UNPLUG SAME. PUMP 100 BBLS HEC, 180 BBLS 9.3 PPG BW, 50 BBLS HEC. CBU. POOH. RIH W/ BHA #27 TO 8566'. TAG TOF @ 8582'. STING INTO FISH. WORK PIPE. CIRC. POOH. DAILY:S31,755 CUM:$1,045,059 ETD:SO EFC:$2,325,159 JAR ON FISH. MW: 9.3 Seawater POOH W/ SPEAR. RIH W/ SPEAR. ENGAGE FISH @ 8582' JAR ON FISH. POOH. NO RECOVERY. RIH W/ MILL & OVERSHOT. TAG FILL @ 8563' WASH TO TOF. ATTEMPT TO REV CIRC. NO GO. MILL OVER TOF & ENGAGE. POOH. HANG UP @ 8495'. JAR ON FISH. DAILY:S45,374 CUM:$1,090,433 ETD:SO EFC:$2,370,533 RIH. MW: 9.3 Seawater JAR ON FISH. WORK FREE. POOH. CBU. POOH. NO RECOVERY. RIH W/ OVERSHOT. ENGAGE FISH. POOH W/ FISH. RECOVER 41'. L/D FISH. RIH W/ OVERSHOT. DAILY:S31,755 CUM:$1,122,188 ETD:SO EFC:$2,402,288 TEST BOPE. MW: 9.3 Seawater RIH W/ OVERSHOT. TAG FILL @ 8589'. WASH TO 8621'. PUMP 100 BBLS HEC PILL. CIRC. POOH. RECOVER W/L TOOLS. RIH W/ SPEAR. ENGAGE FISH. JAR. POOH. RECOVER 2' FISH. TOF @ 8624' DAILY:S31,755 CUM:$1,153,943 ETD:SO EFC:$2,434,043 AK IWell no see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B ECEiVED Alaska.Oil& Gas Cons. Commission Anchorage Number all dady well history forms consecutively as hey are prepared for eacrt well. · . ARCO Oil ~ ~ Gas Company Daily Well History--Interim lllStl~¢tJolta: This form is used during drilling or workover operations, if testing, coring, or perforatmq, show formation name in describing work performed. Number ali drill stem tests sequentially. Attach description of ail cores. Work performed by Producing Section will be ,apo,led on "Interim" sileets until final completion. Report official or representative teat off "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days. or !2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil St,m(:3 until completion. ICounty or Parish District I NORTH SLOPE ARCO ALASKA INC. Field ILease or Unit I DS 3-5 PRUDHOE BAY Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. AUDI 4 04/28/91 (2~) TD: 0 PB:10828 SUPV: MWG 04/29/91 ( 2~-!) TD: 0 PB:10828 SUPV: MWG 04/30/91 ( 3 ~) TD: 0 PB:10828 SUPV: MWG 05/01/91 ( 3 .) TD: 0 PB:10828 SUPV: MWG 05/02/91 ( 3-~) TD: 0 PB: 7891 SUPV: MWG 05/03/91 ( ) TD: 0 PB: 7395 SUPV: SMS The al;ova is correct [%, F - - or forl/'~prePa~ation and distribution POOH W/ OVERSHOT. TEST BOPE. RIH W/ OVERSHOT. RELEASE GRAPPLE. POOH. lState AK MW: 9.3 Seawater ENGAGE FISH @ 8624' JAR. DAILY:S32,355 CUM:$1,186,298 ETD:S17,398 EFC:$2,449,000 PROBLEMS GETTING INTO FISH. MW: 9.3 Seawater POOH W/ OVERSHOT. L/D SAME. RIH W/ MILL. TAG TOF @ 8624' CLEAN OUT INSID OF FISH TO 8643'. POOH TO 8624'. UNABLE TO GET BACK INTO FISH. POOH. RIH W/ MILL. TAG TOF @ 8624'. MILL INTO FISH TO 8644' MAKE CONN. PROBLEMS GETTING BACK INTO FISH. DAILY:S33,230 CUM:$1,219,528 ETD:S50,628 EFC:$2,449,000 RUN VERTILOG. MW: 9.3 Seawater ATTEMPT TO MILL INTO TBG. POOH. MILL WORN. RIH W/ BIT. CIRC. POOH. R/U ATLAS. RIH W/ GR/JB TO 8624' RIH W/ VERTILOG. DAILY:S30,230 CUM:$1,249,758 ETD:S80,858 EFC:$2,449,000 POOH. MW: 9.3 Seawater LOG W/ VERTILOG. R/D ATLAS. N/D FLANGE, N/U FLOWLINE. RIH W/ RTTS. SET @ 7621'. TEST CSG. TEST 2 MORE TIMES, NO TEST EITHER TIME. POOH W/ RTTS. RIH. CBU. R/U BJ. SPOT 312 SX 'G' W/ .31% R-1 F/ 7750'-8624' @ 15.8 PPG, 1.15 YIELD. POOH 11 STDS.CBU. POOH. DAILY:S111,970 CUM:$1,361,728 ETD:S192,828 EFC:$2,449,000 RIH W/ EZSC CMT RETAINER. MW: 9.3 Seawater POOH. RIH TO 7466' WASH DN TO 7784'. CBU. WASH TO 7816' CBU. POOH TO 7800' CIRC. WASH DN TO 7891'. CIRC. POOH. RIH W/ HOWCO EZSV CMT RETAINER. DAILY:S24,755 CUM:$1,386,483 ETD:S217,583 EFC:$2,449,000 N/D BOPE. MW: 9.3 Seawater RIH W/ HOWCO EZSV TO 7595'. BULLHD 272 BBLS 8.6 PPG SEAWATER DN DP. R/U BJ. PUMP 10 BBLS WATER, 66 BBLS 'G' CMT W/ .31% R-1 @ 15.8 PPG, 1.15 YIELD. PUMP 2 BBLS WATER, DISP W/ 39 BBL S9.3 PPG BRINE. UNSTING F/ EZSV, REV OUT. CIRC. POOH. @ 2207', DISP 9.3 PPG BRINE W/ 162 BBLS DIESEL. POOH. N/D BOPE. DAILY:S49,152 CUM:$1,435,635 ETD:S266,735 EFC:$2,449,000 ~\ :~\~,\ "Drilling Supt. IWell no see Procedures Manual Section t0. Drilling. Pages 86 and 87 ECEIVED Anchorage AR3B-459-2-B INumber all dady well history forms consecutively as they are preps,ecl for eac~ well. Page nO ARCO O..,nd Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Flmll~.Rel~O~'%'~ll_~he first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted: also wltell operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not required upon completioll; repo~ Complat|ol~ sod rapreserltatlva test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. ARCO ALASF,.A ?T, NC. District ; - PRUDHOE BAY Field AUDI 4 AS4249 Auth. or W.O. no. ARCO Operator ACCEPT Spudded or W.O. begun I Accounting cost center code NORTH SLOPE IC°unty °r Parish rstate ADL: 28332 DS ~-= WORKOVER / TEMP. PLUG & A~J~DONNF. UT ITitle API: 50-029-20222 91 Date and depth as of S:00 a.m.05/04/91 ( TD: 0 PB: 7395 SUPV:SMS IA.R.Co. W.I. Da!e 03/31/91 Complete record for each day reposed 34) RIG RELEASED @ 1400 HRS, Iotal number of wells (active or inactive) on this, ....... Dst center prior to plugging and 1 bandonment of thi~.~h~l0 our I Prior status if a W.O. I MW: 9.3 N/D BOPE. N/U DUMMY TREE. TEST SAME. INSTALL BPV. SECURE WELL. RIG RELEASE @ 14:00 HRS, 5/3/91. DAILY:S16,080 CUM:$1,451,715 ETD:S282,815 EFC: $2,449,000 Old TD New TD I PB Depth I Released rig Date IKind of rig I Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir :Producing Interval Oil or gasTest time Production Oil on test Gas per day Pum~ size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct{~ For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C Drilling Supt. Number all daily well history forms consecutively as they are prepared for each well. Page no. Division of AtlsntlcRIchfleldCompany A K~, OIL AND GAS CONSERVATION ~[ ;ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing _ Repair well Change approved program _ Operation Shutdown _ Re-enter suspended well _ _ Plugging X Time extension _ Stimulate _ Pull tubing _ Variance _ Perforate _ Other 2. Name of Operator ARCO Alaska, In(;;, 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface ECEIVED 1551'FSL, 762' FWL, Sec. 11, T1ON, R15E, UM At top of productive interval 1183'FNL, 1151' FEE, Sec. 14, T10N, R15E, UM At effective depth 1417'FNL, 899' FEL, Sec. 14, T1ON, R15E, UM Alaska 0it & Gas Cons. C0mmiss At total depth Anchorage 1469' FNL, 863' FEL, Sec. 14, T10N, R15E, UM 6;--Datum elevation (DF or KB) RKB 61' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number 3-5 9. Permit number 76-57 10. APl number :)t~50.029-20222 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical 10950' feet Plugs (measured) None 9291' feet Effective depth' measured true vertical 10828' feet Junk (measured) None 91 87' feet 13. Casing Length Structural Conductor 7 6' Surface 2682' Intermediate Production .1 0883' Liner Perforation depth: measured true vertical Size Cemented Measured depth True vertical depth 20" 390 sx PF II 102' 102' 13-3/8" 6281 sx PF II 2708' 2708' 9-5/8" 900 sx Class G & 275 sx PF 'C' 10306'-10316', 10325'-10334', 10405'-10430' 8768'-8776', 8783'-8791', 8805'-8813', 8851 '-8872' 10908' 9280' 10350'-10360', 10370'-10390', Tubing (size, grade, and measured depth 7" / 5-1/2", L-80, tbg w/ tail @ 10263' Packers and SSSV (type and measured depth) SAB pkr @ 10136' & BAL-O SSSV %~ 2199' Attachments Description summary of proposal ~ Detailed operation program 8822'-8838', BOP sketch 14. Estimated date for commencing operation 115. 05/01/91 I Oil ~( 16. If proposal was verbally approved Mike Minder 04/30/91 Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~ ~11[~.~ ~, Title Drilling] Analyst ~t FOR COMMISSK~N USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity m BOP Test_ Mechanical Integrity Test_ Approved by the order of the Commission Status of well classification as: Gas Suspended Date ,5-~-~ ! Location clearance Subsequent form r'-'~quire 10~ ORIGINAL SIGNED BY LONNIE C. SMITH Commissioner IApproval No. Date ~:~ Form 10-403 Rev 06/15/88 Approved Copy Returned I ! SUBMIT IN TRIPLICATE DS 3-5 PLUGGING PROCEDURE . Isolate shallowest 9-5/8" csg hole with test packer. Test csg above to 3000 psi. 2. PU 1000' 2-7/8" tbg on DP. RIH to TOF @ 8624'. . . . RU BJ Services. Pump 64 bbls Class G cement with retarder. Lead with 10 bbls fresh water. Balance plug into position. POOH +1000' (11 stands). Forward circulate to clear DP. POOH & LD workstring. MU & RIH with 8-1/2" bit & scraper. Tag cement and dress off same. Note TOC and POOH. (Est. TOC @ 7750'). MU 9-5/8" Permanent retainer on DP. RIH to +7600' (50' above shallowest 9-5/8" csg hole). Set retainer and establish injection rate. RU BJ Services. Pump 10 bbl fresh water spacer followed by 66 bbls Class G with retarder. Sting out of retainer and balance additional 15 bbls on top of retainer. POOH above cement top (Est @ 7400'). Forward circulate to clear DP. Adjust cement volume after step #3 tag. Ensure hole is displaced to inhibited 9.3 NaCI brine. POOH & LDDP. 6. Install 5-1/8" bore FMC Gen I hanger. Set BPV ND BOP. NU dry hole tree. Test same. Secure well & move rig off location. RECEIVED DS 3-5 PLUGGING STATUS EST TOC @ 7575' IAAAAAAAA AA A AAAAAAAAA AA EST TOC @ 7395' 9-5/8" EZSV SET @ 7595' 9-5/8" CSG HOLE @ 7650' 9-5/8" CSG HOLE @ 8052' TOP OF 5-1/2" TBG FISH @ 8624', SPLIT TBG FILL TO TOP OF TBG TBG PATCH ACROSS GLM, WITH JUNK LODGED INSIDE/ON TOP SAB PACKER @ 10136' OPEN PERFS F/ 10306'-10383' FILL TO 10383' PBTD @ 10828' TD @ 10950' ~AAAAAAAAAAAAAAA SQUEEZED PERFS F/ 10475'-10595' RECEIVED ~A¥ ~ 9 '~9~ Alaska 0ii & Gas Cons. ~;ommisS'to~ Anchorage AL~,.,Z,A OIL AND GAS CONSERVATION COMMI,.~olON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing _ Repair well Change approved program_ Operation Shutdown _ Re-enter suspended well _ _ Plugging X Time extension _ Stimulate _ Pull tubing _ Variance _ Perforate _ Other 2. Name of Operator ARCO Alaska, Inc... 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1183'FNL, 1151' FEL, Sec. 14, T10N, R15E, UM 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service RECEIVEu At effective depth 1417'FNL, 899' FEL, Sec. 14, T10N, R15E, uMNaska 0il & 6as Cons. ~,0m,,,,s-- At total depth :Anchorage 1469' FNL, 863' FEL, Sec. 14, T10N, R15E, UM 6;--Datum elevation (DF or KB) RKB 61' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number 3-5 9. Permit number 76-57 ~tl0. APl number $0-029-20222 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical 10950' feet Plugs (measured) None 9291 ' feet Effective depth: measured true vertical 10828' feet Junk (measured) None 91 87' feet Casing Length Structural Conductor 7 6' Surface 2882' Intermediate Production 1 0883' Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth Size Cemented Measured depth True vertical depth 20" 390 sx PF II 102' 102' 13-3/8" 6281 sx PF II 2708' 2708' 9-5/8" 900 sx Class G & 275 sx PF 'C' 10306'-1 0316', 10325'-10334', 10405'-10430' 8768'-8776', 8783'-8791', 8805'-8813', 8851 '-8872' 7" / 5-1/2", L-80, tbg w/ tail @ 10263' Packers and SSSV (type and measured depth) SAB pkr @ 10136' & BAL-O SSSV @ 2199' 10908' 9280' 10350'-10360', 10370'-10390', 8822'-8838', 13. Attachments Description summary of proposal X Detailed operation program_ BOP sketch 14. Estimated date for commencing operation 115. Status of well classification as: 05/01/91 I Oil ~ Gas _ 16.If proposal was verbally approved Mike Minder 04/30/91 Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Suspended Signed Title Drilling Analyst FOR COMMISSION USE ONLY Date ,._.~-~-~ I Conditions of approval: ~Nc)tify Commission so representative may witness Plug integrity _~. BOP Test_ Location clearance m Mechanical Integrity Test _ Subsequent form_., require ORIGINAL SIGNED t~¥ LONNIE C. SMITH Approved by the order of the Commission Commissioner IApproval No. ~'/ Form 10-403 Rev 06/15/88 Approved Cop'r SUBMIT IN TRIPLICATE DS 3-5 PLUGGING PROCEDURE . Isolate shallowest 9-5/8" csg hole with test packer. Test csg above to 3000 psi. 2. PU 1000' 2-7/8" tbg on DP. RIH to TOF @ 8624'. . . . RU BJ Services. Pump 64 bbls Class G cement with retarder. Lead with 10 bbls fresh water. Balance plug into position. POOH +1000' (11 stands). Forward circulate to clear DP. POOH & LD workstring. MU & RIH with 8-1/2" bit & scraper. Tag cement and dress off same. Note TOC and POOH. (Est. TOC @ 7750'). MU 9-5/8" Permanent retainer on DP. RIH to _+7600' (50' above shallowest 9-5/8" csg hole). Set retainer and establish injection rate. RU BJ Services. Pump 10 bbl fresh water spacer followed by 66 bbls Class G with retarder. Sting out of retainer and balance additional 15 bbls on top of retainer. POOH above cement top (Est @ 7400'). Forward circulate to clear DP. Adjust cement volume after step #3 tag. Ensure hole is displaced to inhibited 9.3 NaCI brine. POOH & LDDP. 6. Install 5-1/8" bore FMC Gen I hanger. Set BPV ND BOP. NU dry hole tree. Test same. Secure well & move rig off location. RECEIVED UA¥ ~ 9 199t Alaska Oil & Gas Cons. CommissiOn ;Anchorage DS 3-5 PLUGGING STATUS EST TOC @ 7575' A A AAAAA A A AAA AAAA AAAAAAAAAAA 'AAAAAAAAAAAAAAAAAAAAAA 'AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAA < 'AAAAAAAA AA 'AAAAAAA AAAAAAAAAAAAA A AAA 'AAAAAAAAAAAAAAAAAAAAAA IAAAAAAAAAAAAAAAAAAAAAA 'AAAAAAAAAAAAAAAAAAAAAA 'AAAAAAAAAAAAAAAAAAAAAA 'AAAAAAAAAAAAAAAAAAAAAA EST TOC @ 7395' 9-5/8" EZSV SET @ 7595' 9-5/8" CSG HOLE @ 7650' 9-5/8" CSG HOLE @ 8052' TOP OF 5-1/2" TBG FISH @ 8624', SPLIT TBG FILL TO TOP OF TBG TBG PATCH ACROSS GLM, WITH JUNK LODGED INSIDE/ON TOP SAB PACKER @ 10136' <:: <:: OPEN PERFS F/ 10306'-10383' FILL TO 10383' PBTD @ 10828' TD @ 10950' ,AAAAAAAAAAAAAA A 'AAA AAAAAAAAAAAA ,,~A A A ,A A ~ SQUEEZED PERFS F/ 10475'-10595' J ECEIVED MAY 2 9 t99~ 0ii & Gas Cons. Commissio[I Anchorage ARCO ALA£KA, INC. ANCHORAGE, ALASKA .99~~,0 . DnTE- S-~ 6-9~ ' :'~-'~/~.~' ~ ~'~' ' . REFERENCE' ARCO CA~JED HOLE FINALN . "~ -29 4-f 0-9~ F'ERF RECORD. -.:'- RUN f; 5' -"']'~'":.'"" HL~ "3-5 ~=30-9~ VERTILOG'-71 ...... -'." - ....... _ RUN ~,' 5' ' ........ATLAS' 3-18 4-f~-7I INJECTION ' RUN I , 5' CAMCO 3-°°~, 3' ~. . i ,~,,,c,.Ici'py. ................. . ' ' RUN ~'~-' ~_' ' ......... HL~ 3-2°,- 3Loo-°1~. . F'ERF LOG -" RUN ........ 3~.29 - 5"'5~E'~ ...... COLLAR/F'ERF ................ RUN ~, ~ '" .............. ATLA~ . ~-3 4-~-9~ LEAK DETECTION RUN ~; ~. &~ CAMCO 6-6 4-~ ~-E'~ GAMMA RA-Y/CCL TAG ' F:UN ~, ~" CAMCO 9-3? 5-5-9~ CBT F.'.UN ~, ~J' ~CH 9-39 5-5-9~, CET ...... -: ........... RUN f, ~=' SCH 9-4,3 3-~9-9~ ...GAMMA CC]L" OF "JEWELRY F'ERF RECORD RUN ~.,-'5' ' HL~' ....... 9L43 '- ~-:"~-E'f ............ F'ERFE RECORD ...... T ....... . .............. -: ......~ .... RU~'~':'; ...... .. 7-4~ 3-~,-, , FE,..~. RECORD '. . F. JN f, ~ · HL6 :::.~,.f f 7.=6 - 5-~-, f ..-. :..; ~A, ~RFLOD :'L,-~;~:.:.'...:. _.-. -::.. ,%: ...... F, UN ...f .' ."-t:.~.f 2zf ? 'F 4-.f 4-9f .... ':.'-:.t ZNJECTZON~?~:'~?::'~,'~' .,:- .-::."~t:;t'-{.::--.~';.: i,': RUN ?~'};:'{:;5" .:. ~ 4..t : 4..~ 9f ·--:::,~FE,,, .LOE.::¢~:t4:~.~:?:. rr.:,, .' ..... ., :.:.:-.:,:: - , .... . RUN '.' "'L:"~ 6'Z. 6 '-"5"5-9I-, ..... ?:;TB6 CUTT~TE~7';?.':":'-'""~'/ ": :',-~':'."~-?~:" ~. :.::-:.:..~ (7~ ..,.:_ ~-~ f .:...,':;? ERF':. LOE~:?,;'q/V...~y. :,..-.: :..:,_.:._. ,.:..~ .A~' . .'. -::-:: RUN .-.t 7'5 --."'. 4~'t~3-91 '..~.-."~' F, RODUCTZ~N';.?.E:: ~: "~:' ', :'"t.-'):.:-: ~. '~:{E.]'t'.-.:' ":~:' ." RUN'.':i":: · .'- ' -. --. ~t. · · _ .... ~ :..: · ~ · ~. -'~, - -- .' - · , .- , . · ,-. · - ..-.. , - .. · ...~ ..... ~ ,,... ~.... ~, ":.' ... "::~ ..') .... " .;'. "' .:' ', i::' ~:.' .., '~ 6 ..... :i;' ,i C 0 {... L. ~-~ h. ,. l' ... -. ..... . ~ ~ '; I ?.': ..... i ..S 4 .... ",:' .-.. 'i~.:' 'i I N.J iii: (:7: T :[ i:)i'...! ":~' .... "':' 'i 4 .... 'i :3 .... 9 4, C: 0~ I A i:;: ,.'" i::' ii:: i:;, F' ../ ..,'.. · . ~ ....... i: ~'": 'i 4 '~ .... 2. ':; 5:' '; "" .[ ' .... · ... , ..-.. ..... , ,...,. A :~' !... F' 'T' ~"~ A ,:'..,." J.;, F~'. iii. L <": .... '~ .4 'i .... 2 4 9 'f ;::, i::' I:,?. i::' c;: E:"'""'"' i:;, :0 ... ~ . ~ .... ... , ~ ,. L..- I.j ~ ,. ,:'::, .... 4. ,."~. ..... ,~ ,'.-':.... .... ,4), '", C t.~. ,... L. A ~:;: / F:' i:i: ,,',~.. ,c' 5; ..... ~ 2 :i'!: "' 2 ~i:', .... '::~ 'i :I: i:4. j "' ,": '"" ~:: ...... i !"'i Fi 5; ..... '!, ,:".:, 4 ...... i ? ..... i-:' "i .'.:'; ti i... L. A !:;~ .," !:" I:i: i:'.', i::' i 'i .... ~ 2. 3 .... :2 "i;' .... ':i-" '! i:" !:< () !.2 i L.: '!" ]. 0 'i 5 .... 'i 7 ..::!; .... :5 ':i) .... 9 'i F:' I:;.: O.() U C '!" Z (.? N 'i 2 .... !ii: i:-.'. .'~':'. .... '~ 6 .... ':i.:' 'i C""' ~.. , ~ .. ~,... L.. 'i ::2 ..... i, ",." 7 .... ?'."; "~, ..... :,:' 'I F:' F;.: I::) ):) U C 'i" .,. '~' (). i"..! 'i 2 ..... i '? 4 ..... ! :'ii',-" 9 i "'""'" ~ i.... ~..., 'i ?. ..... i ii~ '"-'., .... '~ .... '::)..- 'i F' l:;.'. (:))} Ij F: .... 'T 'r,. O i".! , ' ..... f'" f" :' .'~ ..; ::-' :7 :' :7 · I 2 ..... iii!', ..:':~ ..... i t::~ ..... "r' i ,.,dL..L.~..~t:,,... I I...I,,I 'i 2 ' 2. 'i 'i .... ,5 .... ':;."' 'i !::' !i-:.l'?.l:: t:;:. E i.:: (:)F;.'. -i 4 .... 'i '! ..... i 9 ..... :? 'i i::' Iii: R F' F:. iii: C:r)F.: ....... · .' -'~ '"'~ 'i ,'5'"' ::.'.-,:':. .... ,...-. r ..... ;: 'i :1: N J E C 'T' I (:) N '! '7 '..-..'f:,".'.:; ~.. 'x .':; -.. c.., 4, ..... ]: i".~, ,j iii: C: 'i" I 0 N F' L. E A S Iii: ;S ! (:.', i"..! A i"i.'::' I:~ Iii: "f' U I:;~ N 'i" I.-I E A'i" i ~'::~ t.: H I:':: i} i:~: Iii: C E: 1:':," c.L""' '~ BY ..~~~ ..... · 'i (.:~ 'v' I:-': (:'~ ~', .,~ ! ~",.. Iii: ,....'"" (:i 'T' .' C (] F:' Y A S t:;.: IE C': Iii: .1: I::' 'i" "icl) AI::'I::'i:;:O v .... '~" F;:. A N ,S :~ 9 'i 'i,,..: `'' ':~.., F.'. !..j ::;.: t.J i"'~ i:'.', t.; !:,.: U i"~ ~.;1 !..2 !:,1 U 1"'! !:;.'. U N I:,'.: U F..' t..i N i:,.', i..J N i::: t..j N i:;: !..J i'-.! !:;: LJ t'.! i:'.: U N I.;11..j i",.~ i:~ I..I N RUN 1:;,' t..! ~..! D A '1" f:'?l ^ ARCO ALASKA, INC, F',.O, BOX i ANCHORAGE, ALASKA 995t0 ,. I)ATE: 4-23-91 I~I=,-i=kE. NCE: ARCO CASED HOLE F'INAi_$ " " El:iF 2-2 4- i 2-9 t COLL. AR/'P '2-t 3 3-25-9t F'RODUCTION ,:-:> 4-2-9t TBG CUTI'E:R 4-'i 3-22-'9i F'ROD F'ROFILE/PITS 4-6 3-'24-'9i TEHPERATURIE 4-24 S-24'-'9 i STATIC T EHi::'EI;:A'/LIF~IE 4-"3S ~-2~ ""9~ PITS O~ 9-48 4-'.5-9 ~ COLLAR/F:'EF;:F ~ 2-22 4""~ "'9~ COI_I_AR/F'ERF , ~q 2'-S~ S-2~ -'?~ INJECTION 2'"'SS S-2~ -9~ INJECTION 11~"'98 7-2~'-9~ FLUID I ~' ~ 4'-~ 6 3-~ 8'"9~ F'RODUCI"ION t5-~ ~ ~' , ~.'-~ F'-9t PITS i5-3 2-28-9i F'ERF BREAK DOWN t 6'-6 4-i i -9 i COLLAIq/F'ERF F:' I... E A S E $ I G N A N D R E T lJ R N T I"1 I!: A 1' T A C I"1E D C 0 P Y RI:"]CEI;/ED BY _~ ..~(~~~ HAVE A NICE DAY! .".~'HAF;:ON WILSON A'¥O'- t '529 RLJN t, RIJN t, I:<UN t , RUN t, R LJN t, RtJN t , F< UN t , RUN t, RUN i , RUN t, RUN i , RL!N 'i, F;:LJNi, RLJN i, RUN i , RUN i , RUN i, RUN i , A S' R E C E: I F:"i" - 0 F:" I.:' A T A, A P P R 0 V Iii: D ..'~.. ",u TRAN$":~ 9 i ,(2(') 5" A'I'L.A;~ .5 ' C A i'i C 0 .5" A 'F L. A 5' o,.. &5" CAMCO 5" CAMCO 5 ' CAMCO 5 ' C A H C 0 5' .5" I"t R ,S' 5' ATI_hS 5' ATI..A.S' 5" L'. A f'i C 0 5" CAHCO 5' H RS 5" C A H C 0 ~" H R S 5 ' I--I R S' 5' ,':.', i I..AS D I ,'S' l' R I B U 1' :1:0 N · .-'"' C I.-": N "1" R A !.. '"' [,' I-.I Ii:.:' V R 0 N 11' '"' E: X 1' Iii: N S' I 0 N '11' :~ E X X (:) N t"t A R A T I.'10 N · ..'"' MODIL F :t: L E S F': X F:' I... 0 R A 1' I 0 N · "' F:' I"11 I_ L I F' $ -~. F:'B W E I..I... F:' :1: I... E: S !";,' & D · ..'"' B F',,¥-' $:'l' A'T' E 0 I:: A L A S' K A 'l' Iii: X A C 0 !::.'" .- '") C 0 R R E C'T' E D A 1::' 1: "" I::' 0 F;,' t 4 '- t 6 I S .,- (:~'" 0 ,:. 9 -- 2 0 6 ('3 El 11' ~ 99 ~i: i (.) D A T E · 4 -4- 9 '1 R ii:.. F E R E N C E · A R C 0 A.., E J.;, HOLE i ':~ i(:,', i3 90 FI:'..~,F RECORD RUN i t 5 i'2 .... t6-":2(') '" .... '- "' -. I" I:'-- F,I" R I.:' C 0 R D R U N , 2 .... t,.'~ t '~"'",, "" .,... ''') '7 '"' ':;', "':",, I:' E. I:'.. I" Fi' .... ii: C 0 I:;,' I) RI.. i".l' i , F. "" ~ 'i ' -i ..... i '- ~'"'~'~ ~5""~5 t -9 t .., UL L.r~ k / I-. I::.1',, F ~'~ "'. '"": .3 -:'5 ,':..,', '... 9 i C 0 L. L. A R /I::' ii: R F I:i: !..I I'..~ t , :"~.-9 S-2':?--9i COLLAR/F'I::'RF I.;tl...~N i , .......... ?.....;-?. (.;. · ..... ,,. ,5 .... :..-.'.' ...-:: ..::, ",..:. · ".: i L. U I... I... ~..I I:;..' / P I!i:l:;.'. F' I:;.: LIN i , S-2'.:.,~ S .... 3(:)"' ':':.:' i COL. LAR/I::'E:RF I.,:l ~N i ·., ,, · ...'''~' .... ,....'"'~";', S .... 28-9 i CFiI...L. AR/Plii:I:;.'.F', I:;:Ui".J. i , ..,.':": --" ...':"; i ;""',, "" ,...'.~ '? "" 9 ~-) I::' Iii: R I:: F,: Ii:.: C 0 R D I":: U N i , i i .... 28 i '::': ..... 8-" 9 (') I:;' Iii: R F' R Iii: C': 0 R D I:;.: U N i , i '2 - t i 2 - :29 - 9 (-) F' E I:;: F' R Ii: C 0 I:;: D R J N t , '.i' · :')" i '::'"" ,., I i i .... 8- 9 ":" I::' ii: R F R E C 0 R D I:;.: U N .... ,,, .,,;. .~z i 5 'i 4 i "5"-"':' 5 - ,.... -':2~ F'IERF RECORD RUN 'i, i 4-'~t :::'.'1, - "':' ':~ 9 · _ ...,...,' .... i P Iii: R F' R E C 0 R D R I..I N i , i 5-4 i :'-::-2-9(':) (;AkiMA F;.,'AY RLJN t i..,. '='' - 4 i ":',.... - .,.'::' -? e P E R F' R E. L, U R D R LIN i , '! '5-1 t i ~.:)""2'"~'-'~('~. F'ERt;". RECORD ....... : ................................... RLJN t., i5-21 i(')-29-?(') I::'ERF RECORD RUN i, t 6-9 'z ":,", ':'::'t (.:;Cl.. - ..... RUN t , · -,~'"'",".", ! .... ,""~ ............ '~ - t '?-2 .... '" c.. COI..LAR/F ERF RLIN I , 3--'.,..:,::1- ?i ' " "" ' ' F'LEA,~E :.~IGN AND RETURN l"HE ATTACHED COPY AS RECE:[F'T OF' DATA, R Iii: C E ]: V E D B Y _ I"IAVE A NICE DAY! ......................................... .................................... APPRO-¥E: ;~'I'i~RON W I L. 5,'ON ...... 'FR~N~':~ ATO- 1 529 ........ : ........... ~.~, ,.~ ........................................ ., .. .... :~.,:~ .~ ,, ...... -.?: , , ,~$~"~T.-.~:: ............................. ,.-.. ~F E~RON ~-...,~,~. :.~,~. :~,.~-~ ....................... FB WELL. F:ILES D & M~.~:-'' :''~.' :~a'~j'" ' ' R & D '~ EXTENSION EXELO~AT ION '~ BPX EXXON ,~ STATE OF ALA,~KA RECEIVED ,.'APR 9 19 ! MARAI'HON ......................................... :I:EXACO -'. ............. 2Ilaska.Oil & Gas Cons. COlnmission ........ : ....................... Ai~cl~orage A N C H O 1:;.: A G. FS, A i... A :!,; I.'; A t: :Iii: I::' E F;,' Iii: N C E: ' A R C O C A Z Ii':: D I"10 I_ ["' F:' I N A I...,'.'7 C: 0 L.. L. A I:;i / I' I::. I": I" Fi: (..I i"~. 'i , :5" I...IEAI< DETtii:C'r.I:ON IR.~r..!i, ::i." :1: N,.J E C 'i" :f: 0 N t':' F:'. U F; :12 L. I!i: ~., i:i: U r.~. 'i , 5." I iq,.J Iii: C'¥' .[ O.,".,1 P F;,' O F: 212 I... E I:;,' i..j r,! 'i., :5'" C L I... I...[..'~ 1.,, R t.I i"..~ i C O I... I,.. [:'~ F;,',;' I:;' i:i: R F' i.,,' U Iq i , :5" C O t... I... A F;.:/' P Iii. R i:: i;.: t.J fi! i .. :5 ~' 'f' !ii: H P Iii: R A 'i" U F;.'.li..: I.,.'. I..j N 'i , :5" I::' !:;.: O D U C'. 'f' I C! N I::' F;..' O I::' I I... Iii: I:,: U f.4. 'i , '.5" C O I... i... A F,.: /I::' Ii:.: F;,' F i.,: U r,i 'i , '.5" I::' ]: "l' ;};,' P ~ *r...t 'i "'." , .. ,..,, . .~ .... F.' t:: I-,:. I-' ~.:~ I...: K D W N / T [.: t"'i F' ['i: R A 'i" U R E / 3' F:' I N Ft Iii: I;: I;;.: U N 'i , 15" f": 0 [.. i... (:l t:;.: I:,.' U i'.J .i !5" ..... , .~ CtSI... ~.,: U r,! t: 5" 'i" Iii: i"i I::' E I:;..' A T 1...I R Ii!: / 3' !::' I N N [:. I.,,RI I Fl I .... ' .... .i ...:' I iH,J IE C T I 0 N W /G IR C O F;.'.I:;: Ii:' L A'¥ .1: O N R U N 'i ,.:5" I i".l ...I Ii: C 'f' I 0 N W / C; I:;,' C: 0 R R E L. A T ICi i',l I:;,' U i'.~. t , 5." L Ii".' A K D Iii: T E C T I 0 N I;.'. U N 'i., 2." (2; A 5,' L I I::"i" 5,' U R V E Y R LJ N i , ,..">. ....... ,t, ,:~, F:' L. E A 3' E ;.? :1: G N A N D F,.: E'i"[..! R N T I'-I F A"f' "f' A C H E D C O F' Y A S R E C E I F' r O I::' D A'¥' A, R Ii!: C Iii: ]: V Iii: I) B Y H A",/FS A N I C; I.::: DAY! 3'I-.IAt:;.'.CIN W :1: I...3'ON A T O--. 'i '.5 ':,.:: 9 A I::' F' R 0 V E D ~.'~ 'f' l;:f:'~ N 3' :~ 7t . · "' C IF- N T R A L '11' "'- C H E V R O N D · ,-'"' E X T E N ,S' 1 0 N · ,-'"' E X X 0 N i'i r::~ I-( A i" H 0 N · ,.'"' id 0 B :12 I.. DIS'TRIBUTION .~; · F" I I_E,S' E£XF"LORAT I ON · ,- I::' t"11 L L.. I F:' ,.? F' B W [ii L L. F I L. E 3' R & D .11. · .. B F:' X $ '/" A I iF: t.)l:-' r;:~ L A ~' K A '1' Iii; X A C 0 GaS Cons. 6ommi$¢on Alaska Oil & tXncho~age STATE OF ALASKA ...... ALASKA _ .,_ AND GAS CONSERVATION CO,v,,vIISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing, Repair well Other X, 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1551' N, 762' E of SW cr, Sec. 11, T10N, R15E, UM At top of productive interval 1184' S, 1119' W of SWcr, Sec. 14, T10N, R15E, UM At effective depth At total depth 1440' S, 880' W of NE cr, Sec. 14, T10N, R15E, UM 5. Type of Well Development , X Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 61 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-5 9. Permit number/approval number 76-57 10. APl number 50 - 029-20222 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10950 feet Plugs(measured) 9291 feet Effective depth: measured 10828 feet true vertical 9187 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 76' 20" 390 sx PF II 76' Surface 2647' 13-3/8" 6281 sx PF II 2708' Production 10848' 9-5/8" 900 sx CI 'G' & 275 sx PF 'C' 10909' True vertical depth 76' 2708' 9256' Perforation depth: measured 10306-10316'; 10325-10334'; 10350-10360'; 10370-10390'; 10405-10430' true vertical 8746-8754'; 8762-8769'; 8782-8790'; 8799-8816'; 8828-8849' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 10149' MD; 4-1/2", 12.6,q, MN~80, NPCT tail @ 10263' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10136' MD; 7" Camco Bal-0 @ 2198' MD 13. Stimulation or cement squeeze summary 14. Intervals treated(measured) See attached ~ 2 ? Treatment description including volumes used and final pressure ~t':~J~$~a 0ii & Gas Cons, C0mmiss[0 ' Representative Daily Average ProfuSion or Injection OiI-Bbl Gas-Md ~ Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2987 2985 270 -- 369 Subsequent to operation 2421 3411 271 -- 334 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X~ Gas --. Suspended _._ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 681 SLW c: J. Gruber, ATO-1478 SW JWP SUBMIT IN DUPLICATE DS 3-5 TUBING PATCH INSTALLATIONS DESCRIPTION OF WORK COMPLETED I/1 8/91: MIRU & PT equipment to 4000 psi. RIH w/CT & washed tubing from 9900' to 10150' MD for tubing patch installation. Pumped: .a) 30 bbls Seawater, followed by b) 25 bbls 15% HCI. Displaced HCI w/5 bbls Diesel, 152 bbls Meth/Water, & 270 bbls seawater. POOH. RD. I/25/91: RIH & set a 4.490" OD tubing patch from 9961' to 9982.5' MD. POOH. RD. Flowed well. 2/1 8/91: Ran Spinner/Temperature logs, indicating a leak at 8680' MD (GLV station #8). RD. 3/3/91: RIH & set a 4.490" OD tubing patch from 8664.5' to 8686' MD. POOH. RD. Returned well to production and obtained a valid production test. ARCO ALASKA, INC P · O, BOX ANCHORAGE, ALASKA ' R E F: E R E N C E · A R C 0 C A S E D H 0 !_ E I::' :i: N A 1... ,.? ':""" A 'F L. A .S' RUi"J 1, .,. . F;: U NJ , 5:" A 1' !.. A 5,' ~" A '1" I... A .'.';' RUN t, ~, ~:" A"I'I_ A 5,' RUN i,., RLJN t, .5" AI'I...AZ R LJ NJ, 5' A'l" t... A,<.,;' ~";" All... ~.Y,.~ RLIN i, .., RtJN 1, 2"&5" 5'CH F;,' tJ N i , 2" & 5" .S' C: H RUN 1, "> "&5" ,... ,:~ C !"1 RUN I, 5" A'I'LA,~' RI. IN'J, 2 "&5' ,.~t..H _ "~" & 5" ,.? C I'.1 RIJN f, ,:. . . ..... :> L.. H RUN t, 2"&5" < ..... R! IN '~":" ':";" ,~ L, ... ...,* .~' ~,.- ~ ..-. RI_IN.. ;5 5, '::..,." ..,':' C H R U N ..'5 5:, '::'..,-" $ C. I..! I-:.'.UN i , '::'..,." A'l"l..(-~£' R U N t , ~:..," H !...,.., <'' RUN t , 5" ATI...(:~$ t::' t... t::: A.? E $ t (:.; N A N D F;.: E'T' U R N T I.-i E: A T 'i" A C I--I E D C: 0 F-' Y A 5' R E C E :1: F:' T 0 I-':' I;, A'T' A., H A \," E A t'-.! I (::: 1::: D A Y ! ;:i: H :::; F;.: 0 N W i L. ,S' 0 i"! A 't" 0 .... i 5 2 9 A F:' F:' R 0 ¥ [:. L ~.. ~:. ~ T F;.'. A N S :,~ 9~(.~ 6 .a, D 15' l' R I B LJ l" I 0 N '"'.,,. L. I::. N l F:. ,'..~ L.. F I L. E $ · ,. C: i-.I E V R 0 N D & M ¢,: E X l" E N.S' I ('i N E X F:' L 0 R A l' I 0 N ~ E'.: X X 0 N HARATHON · ,-'"' M O. B :!: 1_ · v.. 'l"i.-! E A F:' I ~ F' 0 R i6-8 IS 5(:~-029-2(~549. · ,,-F' H :!: I... I.. I F'$ F'B WEi..L FILES R & I) '"'-.. B . P X · ,' STATE OF: ALA,S'KA I"EXACO RECEIVED 1991 Alaska 011 & l~s Cons. Commission Anchorage ~-- .~ L-] 0 X ~ L-...',"-", "~: 6 Ai'..J. CHCiRA(~E: AL..Ai.."F..' A AF.:C 0 C Ai.~E D HOLE FiNAL~: 7.-'!~-2 9 ..$--.~ [ ,', .-'....z: 6 .... i '2 9 .... 9-.,-~. :.5 i i .... i2-2.2 i.. 6- i.' 9 F'LEA,S'E ;~ t C:-N · RIECEiVED BY Fi'";;~: A N I F:':'- :i"l .~ ~. !.~HARON WiL£'ON ATO- i 529 ANT",,., ,,..=.=',c';", ~p.xj, ,...,...,, 'I"HtF.. ATTACHED DA'f! COPY AS' RECE:IPT 01:: I) A'i"A,' A P P tk 0 V iL k~ 'f R r~,,,"-~ ;~ :~ wi · ,,- u~_N'TRAL FILES ~'- CHEVRON D & M :J'~ .EXTE-N£-~ I ON EXPLORAI'ION ~ EXXON HARATHON ~ MOBIL '"' i L L_ T · - F' H ., F' :-"':,' F'B WELL FILE3.' R & D '"' r.~ F"x' Z-'i'ATE OF ALASKA TEXACO RECEIVED FEB 8 1991 Alaska 0ii & Gas Cons. Ancb, orage STATE OF ALASKA ALASK/~- L AND GAS CONSERVATION CC MISSION APPLICA ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Alter casing Repair well Plugging Change approved program Pull tubing Variance 2. Name of Operator 5. Type of Well Development X ARCO Alaska, Inc. Exploratory 3. Address Stratigraphic P.O. Box 100360, Anchorage, AK 99510-0360 service 4. Location of well at surface 1551' N, 762' E of SW cr, Sec. 11, T10N, R15E, UM At top of productive interval 1184' S, 1119' W of SWcr, Sec. 14, T10N, R15E, UM At effective depth At total depth 1440' S, 880'W of NE cr, Sec. 14, T10N, R15E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10950 feet 9291 feet Plugs(measured) Casing Length Re-enter suspended well Time extension Stimulate X Perforate Other 6. Datum of elevation(DF or KB) 61 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-5 9. Permit number 76-57 10. APl number 50 - 029-20222 11. Field/Pool ~ru._d.h_oe. Bay Oil Pool iVED S E P - 5 1990 10828 feet ~Ja$~ 0il & Gas Cons. Commission 9187 feet Junk(measurea) - ' Anchorage Size Cemented Measured depth True vertical depth Conductor 76' 20" 390 sx PF II 76' 76' Sudace 2647' Production 10848' 13-3/8" 6281 sx PF II 2708' 2708' 9-5/8" 900 sx CI 'G' & 275 sx PF 'C' 10909' 9256' Perforation depth: measured 10306-10316'; 10325-10334'; 10350-10360'; 10370-10390'; 10405-10430' true vertical 8746-8754'; 8762-8769'; 8782-8790'; 8799-8816'; 8828-8849' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT@ 10149' MD; 4-1/2", 12.6#, MN-80, PCTtail @ 10263' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10136' MD; 7" Camco Bal-0 @ 2198' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation September 1990 16. If proposal was verbally approved Oil x Name of approver Date approvedi Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ /'" - ~,~,.~ Z.,, (.~~ Title Operations Engineering Manager FOR COMMISSION U~l= ~3NLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- '~/-/' Date IApproval No.~:~::~... 7~3 ~ 15. Status of well classification as: Gas Suspended Approved by order of the Commissioner Form 10-403 Rev 06/15/88 Approved Copy ORIGINAL SIGNED BY j Returned i nlUNIF C. SMITH ~'~t~ J,~ommissioner --- ~..-.:: ..... Date SUBMIT IN TRIPLICATE 497 MJB c: J. Gruber, ATO-1478 SH Well 3-5 Hydraulic Fracture Trea_ ment Prellmlnnry Procedure . . . . . , , . . Pressure test tubulars and annulus. Rig up CTU with 3" large hole nozzle. Place sand over the Zone 3 squeezed perforations for a new PBTD of+10440'. Tag new PBTD with slickline. Rig up fracturing service company. Pump propped fracture treatment at 55 bpm using a dual cross linked water system with approximately 226,000 lbs of 16-20 proppant. The maximum injection rate possible will be obtained following pressure ]imitations. The pump schedule is outlined as follows: A. 3350 bbl cross linked water pad. B. 80 bbl with 2 ppg in cross linked water. C. 125 bbl with 4 ppg in cross linked water. D. 140 bbl with 6 ppg in cross linked water. E. 150 bbl with 8 ppg in cross linked water. F. 150 bbl with 10 ppg in cross linked water. G. 100 bbl with 12 ppg in cross linked water. H. 277 bbl gelled water flush. Perform slickline tag. Rig up CTU and cleanout to PBTD. Bring well on gradually using gas lift. REC£1V£D Alaska Oil & Gas Cons. Commission Anchorage 6 5 4 . 2 COILED "rUB[Nt3 UNiT BOP EDU ! PME NT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI4 1/16" PiPE RAMS 3. 5000 PSI4 1/6" HYDRAULIC SLIPS 4. 5000 PSI4 1/6" SHEAR RAMS 5. 5000 PSI4 1/6" BLIND RAMS 6. 5000 PSI4 1/16" STUFFING BOX 4 RECEi VEI ~ska Oil & Gas Cons. Commission Anchorage HIRELINE BOP EOUIPMENT iii 1. 5,000 PSI '7" WELLHEAD CONN£CIOR FLANGE 2. 5,000 PSI WIRELIN£ RAUS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF STATE OF ALASKA .... ALASKA'--'_ AND GAS CONSERVATION C( ~IISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1551' N, 762' E of SWcr, Sec. 11, T10N, R15E, UM At top of productive interval 1184' S, 1119' W of SW cr, Sec. 14, T1 ON, R15E, UM At effective depth At total depth 1440' S, 880' W of NE cr, Sec. 14, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 61 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-5 9. Permit number/approval number 76-57/9-1098 10. APl number 50 - 029-20222 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10950 feet Plugs(measured) 9291 feet Effective depth: measured 10828 feet true vertical 9187 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 76' 20" 390 sx PF II 76' 76' Sudace 2647' 13-3/8" 6281 sx PF II 2708' 2708' Production 10848' 9-5/8" 900 sx CI 'G' & 275 sx PF 'C' 10909' 9256' Perforation depth: measured 10306-10316'; 10325-10334'; 10350-10360'; 10370-10390'; 10405-10430' true vertical 8746-8754'; 8762-8769'; 8782-8790'; 8799-8816'; 8828-8849' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 10149' MD; 4-1/2", 12.6#, MN-80, NPCT tail @ 10263' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10136' MD; 7" Camco Bal-0 @ 2198' MD i~ lm ,/,,q I,,, 1 1 I i,,, r~ i 13. Stimulation or cement squeeze summary ~ 14. Intervals treated(measured) See attached ~ 2 0 1990 Treatment description including volumes used and final pressure Jt, Jas~{:a 0il & Gas C0115. ~lam{ss{011 Representative Daily Averaqe Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1274 1536 5851 -- 291 Subsequent to operation 2803 1921 70 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ Z" ~'"J'~ Service Title Sr. Area Operations Engineer Date 333 Form 10-404 Rev 06/15/88 485 DCR c: J. Gruber, ATO-1478 SH SUBMIT IN DUPLICATE DS 3-05 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE: PRODUCTION PROFILE MODIFICATION 1/9/90 : MIRU CTU & Stimulation Equipment. PT equipment to 4000 psi. RIH w/CT & performed a fill cleanout. Jetted down to 10592' MD. Loaded wellbore w/270 bbls Crude, then washed perforations at: 10306 - 10316' MD Ref. Log: BHCS 8/3/76. 10325 - 10334' MD 10350 - 10360' MD 10370 - 10390' MD 10405 - 10430' MD Pumped: 56 bbls 12% HCI w/10% Xylene, followed by, 67 bbls 12-3% HCI-HF, followed by 60 bbls 6% HCI. Flushed w/6 bbls of Meth-Water. POOH. Rigged down. Flowed well. 1/14/90 : A CTU Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/697 bbls of seawater. Pumped 87 bbls cement, squeezing perforations at: 10306 - 10316' MD Ref. Log: BHCS 8/3/76. 10325 - 10334' MD 10350 - 10360' MD 10370 - 10390' MD 10405 - 10430' MD Placed 40 bbls of cement behind pipe at 3000 psi maximum squeeze pressure. Contaminated cement w/Borax & Bentonite. POOH. Rigged down. 1/15/90 · RIH, & cleaned out contaminated cement from wellbore POOH. RD. 1/18/90 · RIH, & tagged bottom at 10590' MD. POOH. RD. 1/24/90 · RIH & performed a fill cleanout to 10622' MD. POOH. 2/2/90 : Reperforated: 10306 - 10316' MD 10325 - 10334' MD 10350 - 10360' MD 10370 - 10390' MD 10405 - 10430' MD Ref. Log: BHCS 8/3/76. RD. RECEIVED AtIG 2 o ]990 Alasra 0il & Gas Cons. Commission Anchorage Placed well on production and obtained a valid production test. ~::: m E-' C! X i .':.'i:, (i) ?~ 6 ..... · ": n:: A G L'E, :q L A L{: i< A F=c~:'L'ZF;.:ENCE' AF:.c"o CA£ED !4f"ll ¢' F=INAL£ ~ "; ':" ~ '-:5 ~ c),.:'-, F' F' R F' R E"" 0 F:. T; ~ '" d.'. '..]* ~ '" .-' ..; ~.., .~.. .=::- '-i:. "::'--"::' 9 ;:" r. ,"~ ~ ,.-.. r,/!::, E F.'. F' :__ :.., "' ,... s,#. ~.,: t,,. i,, I"I I~'. ~ ..... F' i - 2. '/ ..... :? (') ,'ii; F' i[ iH N E' F::/' T J!!i H i::' ~:." .... ~ ..._, .;- i ~ 2 "' ,:':: ..... :"' ;:" C: R :.'" C (": L ,::' 4 i 2- 4 -9 ;:" V iF.: F::. "r' ]: l i"'~ ~:-=. -- ,j :~ 4 ...... *- "-' .,":~ .. , -,:::;-'-.:, ._. SP Z NNEF:.,"'i"EMF' S .... 2 "; "::-- t_.JL.L~.4h:,.' ," ,...h.r' .~-'..::, 9':'":' "'F ..' ", ..'r,~'-,,- 9-")6::_ i '.'"':'-";., ,4'-:.'=',":.:' .... EF'ZJ...Og/PDK-i ":" ¢'.-. .... OYEF;;LAY ! ;~;-6 2-¥-96' 'Cr3LLAR (TBC; CUT) i 4-i '7 t ..-':::,a-c;',;:", LEAK DE?ECTZON t..,. '=:- 2 i 2-'3;-9(:;, C 0 L_L AR,-'"P ERF F'I_EA£E"' ,S.'tGN AND F.:ETURN THE A'FTACHED COF'Y AS F;.:ECEIPT .................... R C-E"i-V O DAY! ..... 'FEB 0 RECE']:VED BY HAVFZ A NiCF-' ;:TA L. L Y HOFFECKFR i"q T ~'"~,.. '"' i '::'.~- ,~ '~'" ;:' OF' DATA. A ', L. A A i' L.. A ,'":.' H (i: ,':.~: A f'~ ~... i'q ,? A'i" i.. A iq i' L. A.S' H IR S A "1" L. iq DI~TR:[BUTION · ,- C E N T ~" A L I:'' 'r L E S ~ F' I'-t :[ L L i F' S · "'.,. CI-IF;,.,"REJN F'B WELL FZLE,S: · D,.,:*- M I:;:. & D ":'.,,. EXTENeiON.~ EXPLORATION ~: BF'X :~ EXXON :~ S"f'ATIE OF ,qLAS!<A M A F;: A T H 0 N -i,': T ii:.: X A C 0 ¢- MOBIL · :~ ","' H E C 0 R F.: E C i' iE i) A F' I ~: F:' 0 F.: ':~:'-' '"2 13' .:~: 6,.- (!:, 2 ?'-';..'.2 (.~ 25: 4, ANCHORAC~E ~ AL.A;!;K A 99.5 i ¢, DIqTE' i .... S .... 9 ('5 R ii'] F: E R E N C E ' A R C'. 0 P R E S $ U R ii: D A '1" A S-J9 6 .... ii .... iii: 9 BHF ......... FL. OWINC. C-RADIENT 6 .... 6 9- i 4 -' 89 B F! F ......... S T A i' I C C. R A i) I E N T 6 .... i 4 9-'7"" 8 Si-.' B H F ........ $ T'A T I C C-R A D I E N T 6 .... .,..":) t c:;, ... .,-..") o,., .... ,.,° o,. B t"t P · ....... F' L.. 0 W .:.t' N G C; .R A D ]: E N T ?'"' 5. i 0 .... i i .... 8 9 B H i:: ....... :F:' L. 0 W I N C,- [I; F;..' A D I E N 't" 9 .... ,....':' c;,, c~: -' 2 ~:~ .... Iii', 9 B t"1F ......... S 't" A T .,.'r f"., f:;. R. A D I E N 'i" · ... '"~ ... 9-3,':', 9 .... 2 ," .... U -., B H F ......... ;!-? 'i' A T I C [I; R A D '.[ E N't" 9..-. 3 ',i~ 9- 3 0 .... 8 9 B I.-t F: ........ ;'S' '/" A 'i" I Cf: [;. 1:;~ A D ]I E N '1" ".~ ~.': m- , - - 9-,....,. 9 .... ..: .... 8 ':~'' B HI .......... S T A T I C G R A D t E N T i ,:S .... ') 9 .... i .:: '.-' iii 9 B 1'-t F ........ ,% TA T I C (} R A I) I E N'i" i '..'5 .... i i ~:..."' i~-"-89 BFtF: ......... STATIC GF~'.ADIEN'I" i ~'!!: .... 30 9 .... i 3-89 B H F ........ ,S TA"f' I C G R A D I E IN T i4 .... 28 9 .... i'?-89 BHF: ....... STATIC C. RADIENT i4-38 9-2-89 BHF ........ STATIC [~RADIENT i 5 -.,.. ') i 9. - ,."5 - :.,o 9. B H F ........ S T A T I C C- R A D I Ii.". N T i aS- 2 (-") i (-) - 4 -89 B H F ....... S i" A T I C (~ R A D t E N T i8 .... i8 '?-3-89 BHF ........ STATIC GRAD.lENT i 8 .... 2 i '?-" 3 .... ii.", 9. B I..t F ......... S T A T I C G R A D I E. N T C A M C Il) C A M C 0 C A M [. 0 C A M C 0 C A M C 0 C A M C 0 C A M C 0 C A M C 0 C A M C 0 C A M C O C A M C 0 C A M C O C A H C 0 CAMCO C A M C O C A H C O C A M C 0 C A M C 0 C A M C 0 F:' L Iii: A S Ii" .~ I C. N A N D R F'i" U R N '1- H FZ " ....... ~' ..... "' '"" ~..~ I f ~.~ L, t"t I.: ~ C 0 F' Y A S t:;..' E C E: .[ F:' T Ill) t::' D A TA ,. R Ii!: C E I V E D B Y .......................................................... I"iAVE A N. ICIE DAY! REC~ ,.SAL. L.Y H O F:' F E [': I< I!-" I:;.'. .lAN "$ r: F'f'l:::OViii:Z) ........ A'T 0 .... t 5 2 9 Ala$~:'~ Bit & Gas OOl~. GO.B'I~II~ 't"R A N S :~ 9 (-) D ¢,-4 DISTRIBUTION CENTRAL FILES :,~ Pt"t I i..!_ I F:'S C FIE V R ON F:' B W E I... L.' F ]t; t... E S · ~ D & M .,~'~R & D EXTENSION EXPLORAi'ION '"' · ,,'B F:' X · ~ L.,.,,,ON ... STATE OF' ALASKA ~'i A R A T H O N ...'~T E X A C O · .-"~ M O B_ I I.. AR.';O Alaska, Inc. Prudhoe Bay alineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager December 22, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-5, Permit No. 76-57 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Sincerely, D. F. Scheve DFS/DCR/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 3-5)Wl-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ~--~ ALASKA'S-"' AND GAS CONSERVATION CL ,vllSSlON-~, ~ APPLICA, ,ON FOR SUNDRY APPROVAL S 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X' Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 61 RKB feet 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 1551' N, 762' E of SWcr, Sec. 11, T10N, R15E, UM At top of productive interval 1184' S, 1119' Wof SWcr, Sec. 14, T10N, R15E, UM At effective depth At total depth 1440' S, 880'W of NE cr, Sec. 14, T10N, R15E, UM 8. Well number 3-5 9. Permit number 76-57 10. APl number 50 - 029-20222 11. Field/Pool 12. Present well condition summary Total depth: measured true vertical 10950 feet 9291 feet Plugs(measured) Effective depth: measured 10828 feet true vertical 9187 feet Junk(measured) Casing Length Size Cemented Prudhoe Bay Oil Pool Measured depth True vertical depth Conductor 76' 20" 390 sx PF II 76' 76' Surface 2647' 13-3/8" 6281 sx PF II 2708' 2708' Production 10848' 9-5/8" 900 sx CI 'G' & 275 sx PF 'C' 10909' 9256' Perforation depth: measured 10306-10316'; 10325-10334'; 10350-10360'; 10370-10390'; 10405-10430' true vertical 8746-8754'; 8762-8769'; 8782-8790'; 8799-8816'; 8828-8849' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT@ 10149' MD; 4-1/2", 12.6#, MN-80, PCT tail @ 10263' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10136' MD; 7" Camco Bal-0 @ 2198' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation December 1989 16. If proposal was verbally approved Oil x Gas Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~//~~,~~ Title Operations Engineering Manager FOR COMMISRION LISE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test __ Subsequent form required 10- ~c~z~ 15. Status of well classification as: Suspended Date /~~,~/' Approved by order of the Commissioner ORIGINAl. SIGNED SlY CONNIE C. SMITH Commissioner Form 10-403 Rev 06/15/88 244 D. C. Reem SUBMIT IN TRIPLICATE D.S. #3-5 CTU Cement Squeeze - PPM PRELIMINARY PROCEDURE Workover Objective' Clean out fill. Acid wash perforations. Squeeze off all perforations with cement. Reperforate well after one week WOC. 1. RU slickline. RIH and tag fill. Surge well. Re-tag fill. RD slickline. RU CTU and cleanout fill to 10650' MD if necessary. 2. RU CTU and acid equipment. Acid wash perforated intervals. Production test well. 3. RU CTU and cementing equipment. Lay in cement across the perforations. Squeeze off perforations with 3000 psi squeeze pressure. Volume of cement to be pumped will cover all perforations. The following perforations will be squeezed (Ref BHCS dated 8/3/76)' Current Per~, MD 10306-10316' 10325-10334' 10350-10360' 10370-10390' 10405-10430' 10475-10515' 10530'-10555' 10570'-10595' Zone(WF) Comments 4 (Z1) Reperfs 4 (Z1) Reperfs 4 (Z1) Reperfs 4 (Z1) Reperfs 4 (Z1) Reperfs 4,3 (V2) Sqz'd - Leaking 3 (V2) Sqz'd - Holding 2 (V2) Sqz'd - Holding 4. Hold squeeze pressure for one hour. 5. Dilute/contaminate cement remaining in wellbore. 6. Cleanout cement left in wellbore. Spot seawater across future perf intervals. 7. Shut well in for one week. 8. RU perforators and perforate well as outlined below: (Ref BHCS dated 8/3/76) Current Perfs, MD Zone(WF) Post-Sqz Perfs, MD Density Comments 10306'-10316' 4 (Z1) 10306'-10316' FSD Reperfs 10325'-10334' 4 (Z1) 10325'-10334' FSD Reperfs 10350'-10360' 4 (Z1) 10350'-10360' FSD Reperfs 10370'-10390' 4 (Z1) 10370'-10390' FSD Reperfs 10405'-10430' 4 (Z1) 10405'-10430' FSD Reperfs 10475'- 10515' 4,3 (V2) Sqz'd Leaking 10530'-10555' 3 (V2) Sqz'd - Holding 10570'-10595' 2 (V2) Sqz'd - Holding 9. Return well to production. Estimated Reservoir Pressure = 3800 psi Estimated Reservoir Pressure = 194°F 6 5 4 3 2 COILED TUBING UNiT BOP EOM l pHENT 1. 5000 PSI ?" WELLHEAD CONNECTOR IrLAN0£ 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/§" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUIrlrING; BOX 3 2 H]RELINE BOP EOUIPHENT iii I iiiii iii 1. 5000 PSI *7" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIR£LINE RAMS (VARIABLE SIZE) 3. 5,000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PAC~(-orr ARCO ALASKA, INC. F'~O. BOX i00S60 ANCHORAGE, ALASKA DATE' t0-6-89 REFERENCE' ARCO CASED HOLE FINALS i-t7 9-t7-89 PRODUCTION F'ROFILE RUN 2-4 9-t6-89 TEMF'/FLUID DENSITY RUN 3-5 9-t3-89 F'RODUCTION PROFILE RUN 4-3 9-t9-89 DEF'TH DETERNINATION RUN 5-t 0 9-t 6-89 GR/CCL RUN 6-6 9-26-89 COLLAR RUN 6-it 9-24-89 F'ERF RECORD RUN 7-8 9-2-89 EPILOG RUN tt-28 t0-~-89 PRODUCTION PACKER RUN t4-28 9-t7-89 STATIC TEMP SURVEY RUN t4-3i c?-t4-89 F'RODUCTION PROFILE RUN t5-i5 ~ 9-i3-89 TEMP SURVEY RUN t8-3 9-18-89 LEAK DETECTION SURVEY RUN F'WDW3-t 9-t5-89 TEMF'/FM SURVEY RUN i, i, i, i, i, i, i, i, i, t, PLEASE SIGN AND RETURN I'HE ATTACHED COPY AS RECEIF'T OF DATA RECEIVED BY HAVE A NICE DAY! SALLY HOFFECK~a$~, APPROVED ~ AT0-t529 kaOiI&GasCons. CommlSS[O"I'TRANS~ 89 ~'- Anchorage 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' 2'&5' CAMCO CAMCO CAMCO SCH CAMCO ATI_A~,' SCH ATLAS ATLAS' CAMCO CAM(, .) CAMCO CAMCO CAMCO DISTRIBUTION CENTRAL FILES ~ F' -.- HILLIF'S CHEVRON F:B WELL FILES D & M R & D EXTENSION EXPLORATION ~ ~ BPX EXXON ~ STATE OF ALASKA MARATHON ~ TEXACO MOBIL * THE CORRECTED AF'I~ FOR 5-i0 IS 50-029-20263, ARC(] ALA~K~ F'~ 0 ~ BOX ANCHORAGE~ ALASKA 995 DATE' 2-i 5-8? REFERENCE' ARCO CASED HOLE FINALS i -~ 4 ..:)-4-89 3-5 2-S-87 3-24 2-6-89 a-~', 2-8-8? 5-9 2-4-8© 6- t 4 2-8-89 COLLAR/F'ERF RUN t, 5" PRODUCTION (GRAD !OMANOMETEF'.:) RUN COLLAR/PERF RUN FLUID DENSITY (GRADIOMANOMETER) RUN t, 5' COLLAR/F'E'"RF RUN ~ , 5' COLLAR/F'ERF RUN i, 5' PLEASE: SiGN ANI) RETURN THE ATTACHED COPY AS RECEIPT OF DATA~ ATLAS' SCH ATL_A$ $ C H ATLAS ATLAS RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-iS')o~, V aPPROYED _~. .... DISTRIBUTION ~ CENTRAL FILE~ -.-""CHEVRON ~ EXTENSION EXPLORATION ~~ EXXON MARATHON ~ MOBIl_ '":'PHILLIPS F'B WELL FILES' R & D SAF'C .STATE OF ALASKA TEXACO ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, A~aska 99510~0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering LManager January 30, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-5 Approval No. 8-305 Dear Mr. Chatterton: Attached is the Report of Sundry Well formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI(DS 3-5)W1-3 Operations detailing work per- WELLS3/46 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompa.y AR3B---6132-C ~-- STATE OF ALASKA AL. (A OIL AND GAS CONSERVATION COMMi,. ,ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: 2. Na~ne of Operator Operation shutdown __ Pull tubing __ Alter casing ARCO Alaska, Inc. Stimulate __ Plugging __ Pedorate __ Repair well __ Pull tubing __ Other 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 155' N, 762' E of SW cr, Sec. 11, TiON, 5. Type of Well: Development ._~ Exploratory __ Stratigraphic __ Service __ R15E, UM 6. Datumelevation(DForKB) 61' RKB ~ UniLorPr,9Pertyoame .... uruanoe ~ay unzc 8. Well number 3-5 At top of productive interval 1184' S, 1119' W of At effective depth SW cr, Sec. 14, T10N, Attotaldepth 1440' S~ 880' W of NE cr, Sec. 14, TiON, R15E, UM R15E, UM 9. Permitnumber~pprovalnumber 8-305 10. APInumber 50-- 029-20222 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10950 feet Plugs(measured) 9315 feet Effective depth: measured 10828 feet Junk(measured) true vertical feet 9211 Casing Length Size Cemented Measured depth Conductor 76' 20" 390 sx PF II 76' Surface 2647' 13-3/8" 6281 sx PF II 2708' Production 10848' 9-5/8" 900 sx C1 'G' & 10909' & 275 sx PF 'C' · True vertical depth 76' 2708' 9280' Perforation depth: measured 10306-10316'; 10325-10334'; 10350-10360'; 10370-10390'; 10405-10430' true vertical 8768-8776'; 8783-8791'; 8805-8813'; 8822-8838'; 8851-8871' Tubing (size, grade, and measured depth) 5½", 17~/, L-80 PCT @ 10120'MD; 4½", 12.6~f, MN-80, PCT tail @ 10276' MD Packers and SSSV (type and measured depth) , Baker SAB packer @ 10136' MD; Camco BA1-0 @ 2198' MD 13. Stimulation or cement squeeze summary Attached Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1914 1447 4590 -- Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~~~ Title Operations Tubing Pressure 455 4362 4192 528 -- 16. Status of well classification as: Oilv/__ Gas ~ Suspended __ Service 587 Engineering Manager Date Form 10-404 Rev 06/1,5/88 WELLS3/46 D. M. Fife, 263-4278 SUBMIT IN DUPLICATE DS 3-5 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR WATER SHUT-OFF 5/20/88 5/22/88 6/1/88 6/15/88 MIRU. RIH to wash perforations from' 1 0 3 0 0- 1 0 6 81 ' Ref. Log' BHCS 8/3/76 Pumped the following treatment: 1. 280 bbls crude 2. 50 bbls gel 3. 225 bbls HCI MIRU. RIH to wash perforations from: 1 0 3 0 0- 1 0 6 81 ' Ref. Log: BHCS 8/3/76 Pumped the following treatment: o 250 bbls crude 142 bbls HCI w/20% xylene 55 bbls diesel The CTU squeeze was performed as follows: MIRU CT. Fluid packed wellbore w/450 bbls seawater. squeezing open perfs: Pumped 40 bbls cement, 10306-10316' MD 10325-10334' MD 10350-10360' MD 10370-10390' MD 10405-10430' MD Ref. Log: BHCS 8/3/76 Contaminated cement. WOC. Reversed out contaminated cement. Reperforated' 10306-10316' MD 10325-10334' MD 10350-10360' MD 10370-10390' MD 10405-10430' MD Ref. Log' BHCS 8/3/76 Returned well to production and obtained new capacity. DMF/O041 ARCO ALASKA, INC. P.O, BOX ANCHORAGE, ALASKA 995i0 DATE: 9-9-88 REFERENCE: ARCO CASED HOLE FINAL 2-i 4 8-Ji -88 2-t 6 8-3t-88 ~--3-5 8-22-88 ~J-t2 8-29-88 ~J-25 8-27-88 4- t 8-J t -88 4-9 8- i 9--88 4- t ~ 8-22-88 ~5-i2 8-4-88 5- t J 8-4-88 ~&-i2 8-i ?-88 7-8 8-t ?-88 ~7-i5 8-t7-88 ~7-S3 9-7-88 9-i S 8-i 8-88 "'-..i t - t 5 9-2-88 i ~-'i 8 8-2t -88 t 4-3 8-26-88 '"~i 5-i 8-Jt-88 ~"'--i 5-2 t 8-29-88 '"" t 8-3 9-i-88 18-i7 9-1 -8t~ COMPLETION RECORD--GAMMA RAY RUN i, PRODUCTION PROFILE RUN PRODUCTION F'ROFILE RUN i LEAK DEI'ECTION TEMP RIJN t, 2' FLOWMETER--GAMMA RAY RUN i, 5 · PITS RUN t , 5 · INJECTION PROFILE TEMF' SURVEY RUN i, 5" IN,]ECTION PROFILE RUN CONTINUOUS FI. OW SURVEY RUN i, CONTINUOUS FLOW StJRVEY R~JN t, 5" PIT~' RUN i, 5' PRODUCTION F'ROFILE RUN i, 5' PRODUCTION F'ROFILE RUN i, 5 · COLLAR RUN COLLAR RUN i, 5' PFC RIJN t, 5 · INJECTION PROF'ILE I'EMP SURVEY RUN t, LEAK DETECTION RUN t, ~"&5" PRODUCTION F'ROFILE ' RUN CCL--GAMMA RAY RUN t, 5' COLLAR/PERF RUN P~-RFORA'i'iixG RECORD RUN,.'.~, .., = '- 'PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIF'T OF DATA. $CH CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO GEAR GEAR CAMCO CAMCO CAMCO ATLAS CAMCO' ATLAS CAMCO CAMCO CAMCO CAMCO ATLAS $CH RECEIVED BY HAVE A NICE DAY! ~ALLY HOFFECKER AT0-i529 TRAN$ ~88568 APPROVED DISTRIBUTION CENTRAL FILE~' CHEVRON DAM EXTENSION I--XF'LORA'FION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D SAF'C STATE OF AL.A~'I(A I'EXACO STATE OF ALASKA ALASI',,~ OIL AND GAS CONSERVATION COMM.,.,,.~ION REPORT OF SUNDRY WELL OPERATIONS 1. ,Operations performed: 2. Name of Operator ARCO Alaska, I.nc 3. Address Operation shutdown ~ Alter Casing ~ Other =, Stimulate ~ Plugging ~ Perforate ~ Pull tubing 5. Datum elevation (DF or KB) 61 ' RKB Feet 6. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 11. 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1183' FNL, 1151' FEL, Sec. 14, T10N, R15E, UM At effective depth 1417' FNL, 899' YEL, Sec. 14, T10N, R15E, UM At total depth 1469' FNL, 863' FEL, Sec: 14, TION, R15E, UM Present well condition summary Total depth: measured 10950 feet 9291 feet 10828 feet 9187 feet Size 20" 13-3/8" 9-5/8" true vertical Effective depth: measured true vertical Casing Length Conductor 76 ' Surface 2682 ' Production 10883' Plugs (measured) Junk (measured) Prudhoe Bay Unit 7. Well number 3-5 8. Approval ~m~ber 9. APl number 50-- 029-20222 10. Pool Prudhoe Ba~ Oil Pool Cemented Measured depth 390 sx PF II 6281 sx PF II 900 sx Class G & 275 sx PF "C" 102' 2708' 9280' True Vertical depth 102 ' .2708' Perforation depth: measured 10306-10316', 10325-10334', 10350-10360' true vertical 8768.2-8872.4' (5 intervals) Tubing (size, grade and measured depth) 7"/5%", L-80, tbg w/tail @ 10276' Packers and SSSV (type and measured depth) SAB pkr @ 10136' & BAL-0 SSSV @ 2199' 12. Stimulation or cement squeeze summary , 10370-10390' Intervals treated (measured) Attached Treatment description including volumes used and final pressure , 10405-10430' 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1600 1280 3733 -- 700 1050 6300 Tubing Pressure 430 psig 280 psig 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] foregoing my knowledge 15. I hereby certify that the is true and correct to the best of Signed 2~F/~~~ Title Operations Engineering Manager Form 10-404 Rev. 12-1-85WELLS2/li5 J. M. Heusser, 263-4266 Dat~ Submit Drill Site 3-5 Coiled Tubing Unit Cement Squeeze Water Shut Off 8/29/87 9/4/87 9/5/87 9/7/87 9/8/87 9/27/87 Rig up coiled tUbng unit. volumes plus additives: Acid wash perforations with the following 40 bbls Xylene 197 bbls 12% HCl 40 bbls 6% HC1:1.5% HF 43 bbls 12% HCl Pumped 62 bbls of cement through the coiled tubing. Obtained 1600 psi squeeze pressure and held for 1 hour. Contaminated cement. Shut in well overnight. Jetted out contaminated cement. Shut in well. Rig up wireline. Run in hole with dummy gun, tubing tail locater and sample bailer. Obtain cement sample. Rig up coiled tubing unit, Reverse circulate out contaminated cement. Reverse circulate out remaining contaminated cement. Shut in well. Perforate. Reference Log: BHCS 8/3/76 10306 - 10316 4 spf 10325 - 10334 4 spf 10350 - 10360 4 spf 10370 - 10390 4 spf 10405 - 10430 4 spf Flow well. ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering I~anager July 1i, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-5 Approval No. 590 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. D. F. Scheve DFS/JMH/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 3-5)W1-3 WELLS2/ll5 A~CO A~aska, ~n~. is ~ Subsidiar~ of ~Hanfic~ichfie~dComDa.¥ AR3B -6132-C STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMM,oSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate~ Pull tubing Alter Casing ~' Other j~ 2. Name of Operator ARCO Alaska~ Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1183' FNL, 1151' FEL, Sec. At effective depth 1417' FNL, 899' FEL, Sec. 14, T10N, R15E, UM At total depth 1469' FNL, 863' FEL, Sec. 14, T10N, R15E, UM 14, T10N, R15E, UM 5. Datum elevation(DF or KB) 61' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-5 8. Approval number 9. APl number 50-- 029-20222 10. Pool Feet Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured 10950 feet true vertical 9291 feet Effective depth: measured 10828 feet true vertical 9187 feet Casing Length Size Conductor 76' Surface 2682' Production 10883' Plugs (measured) Junk (measured) Cemented Measured depth 20" 390 sx PF II 102' 13-3/8" 6281 sx PF II 2708' 9-5/8" 900 sx Class G & 9280' 275 sx PF "C" ~ue Verticaldepth 102' 2708' Perforation depth: measured 10306-10316" 10325-10334' true vertical 8768o2-8872.4' (5 intervals) 10350-10360' 10370-10390' 10405-10430' Tubing (size, grade and measured depth) 7"/5~", L-80, tbg w/tail @ 10276' Packers and SSSV (type and measured depth) SAB pkr @ 10136' & BAL-0 SSSV @ 2199' 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil~Bbl Gas-Mcf Water-Bbl Casing Pressure 1600 1280 3733 -- 700 1050 6300 Tubing Pressure 430 psig 280 psig 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed 2¢'~/~,~~,w~-- Title O,erations Engineerin~ Manager Form 10-404 Rev. 12'1'8°WELLS2/l15~ J. M. Heusser, 263-4266 Date ,~/.~¢'~' I/' Submit in Buplicat~/, Drill Site 3-5 Coiled Tubing Unit Cement Squeeze Water Shut Off 8/29/87 9/4/87 9/5/87 9/7/87 9/8/87 9/27/87 Rig up coiled tubng unit. Acid wash perforations with the following volumes plus additives: 40 bbls Xylene 197 bbls 12% HCI 40 bbls 6% HC1:1.5% HF 43 bbls 12% HCI Pumped 62 bbls of cement through the coiled tubing. Obtained 1600 psi squeeze pressure and held for 1 hour. Contaminated cement. Shut in well overnight. Jetted out contaminated cement. Shut in well. Rig up wireline. Run in hole with dummy gun, tubing tail locater and sample bailer. Obtain cement sample. Rig up coiled tubing unit. Reverse circulate out contaminated cement. Reverse circulate out remaining contaminated cement. Shut in well. Perforate. Reference Log: BHCS 8/3/76 10306 - 10316 4 spf 10325 - 10334 4 spf 10350 - 10360 4 spf 10370 - 10390 4 spf 10405 - 10430 4 spf Flow well. ~ ' .TIT.~N ? 7 !98 !?' !::] !!!. f;.:. '?',... ':.":;: !.::! i',.)i"...! i::'";"' '";' ---- ~ Alaska 0il & Gas Cons. Commission ""' ~i '~ ..... : :':' ..... :'" . ./'~ Anchorage '"." l:;' ::':'. j". ':.:' ':~- .': :' ':::' .': :. ":' " / ' ' '/ : ;..' ;..',.i" 7 7L'"i ..... ,~, - .,' /',:' ' ,. ? ~ ~,¢: · :...,.,.-:.-,.: ~., ,.., !-~.,.. ~::.~ ~C..~- ANCHf]RAF;Fo AI.AX'KA 995 t DATF' REFERFNCE' A~CO PRE~IIRE DATA 2-7 ~-72 4-~A-RR 3-24 4-t5-RR ~-?R 4-~A-RR 9-9 4-tA-RR 9-tt 4-t?-RR 9-2~ 4-t6-RR t7-t t-27-RR RHP-~TATIR ~RADTFNT RHP-~TATTC RRADTENT RHF'-~TATT~ ~RADTFNT DHF'-~TATTC ~RADTDNT RHP-~TATT RHF'-%TATT BHP-FI.nWT ~HF'-FI CDT RHF'-%TAT~ BHF'-~TATT RHF'-XTATT RHF'-FI. CDT n ~RADTFNT N~ ~RADIFNT N~ ~RADTFNT E ~RADTFNT ~ ~RADTFNT NC ~RADTFNT F'I_EACE ,.~.T. 6N AND RFTIIRN ~/~F.-. ATT~C. HF/~E~F'Y A,~' RF-TCF~F DATA. R'FCFTVFD AY ..... HAVE A ATO- t TRAN,? -,rRS,.RR APPROVED DT~TRTRI. IT]RN RTT~ RTT~ nTT~ RTT% ~TT~ CFNTRAI.. F .T.I..E,.9 ~ PH T LI.,.'[ PS CNtSVRtTIN F'R I,IFI..I... FTI ~~ D & M ~ P A~ D EYTEN,? I [1N EXF'I... [1R'AT I (71N ~ X'AF'C ~ ."Fr':Z"~l-" 0 '1"1 / ,[,, MAR'ATHFIN ~ TFYACN ARCO Alaska, Inc. Prudhoe Bay =;,~lgineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 21, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-5 Permit No. 76-57 Dear Mr. Chatterton: Attached is the Application for Sundry performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI (DS 3-5)W1-3 Approval detailing work to be ARCO Alaska, Inc. is a Subsidiary of AtlaniicRichfie~dCompany AR3B --6132-C STATE OF ALASKA ALASKA ,JIL AND GAS CONSERVATION COMMI~...,ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon F! Suspend ~ Operation Shutdown ~ Re-enter suspended well F~ Alter casing ,~ Time extension ~ Change approved program ~ Plugging [] Stimulate ~ Pull tubing ,~' Amend order ~ Perforate ~ Other 2. Name of Operator ARCO Alaska: Inc. 3. Address Post Office Box 100360, Anchorage~ AK 99510 4. Location of well at surface 1551'N, 762'E of SW cr, Sec. 11, TION, R15E, UM At top of productive interval 1184'S, 1119'W of SW cr, Sec. 14, TION, R15E, UM At effective depth At total depth 1440'5, 880'W of NE cr~ Sec. 14~ TION, R15E, UM 11. Present well condition summary Total depth: measured 10828 feet Plugs (measured) true vertical 9211 feet Effective depth: measured 10800 feet true vertical 9188 feet Junk (measured) 5. Datum elevation (DF or KB) 61' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-5 8. Permit number 76-57 9. APl number 5O-- 029-20222 10. Pool Prudhoe Bay 0ii Pool 28' (Spinner log w/20' wire Casing Length Size Cemented Measured depth True Vertical depth Conductor 76' 20" 390 sx Surface 2708' 13-3/8" 6281 sx Production 10909' 9-5/8" 900 sx 76' 76' 2708' 2708' 10909' 9280' Perforation depth: measured true vertical 10306-10316' 10325-10334' 10350-10360' 10370-10390' 10405-10430' 8851-8871' Tubing (size, grade and measured depth) 5½", 17#, L-80 @ 10069', 4½", 12.6#, MN-80 tailpipe to 10276' Packers and SSSV (type and measured depth) Baker 5AB @ 10136'MD; Camco Ba]-O @ 2210' 12.Attachments Description summary of proposal Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation May 1, 1988 14. If proposal was verbally approved ';'::.:]_~,_,::c-:.:: ~:;,~_: '~:: ;3m.:':'t:'~ <:~ Name of approver /.,.,,~r, ~ .~ Date approved 15. I hereby~rtify that~he joregoing is true and correct to the best of my knowledge ..~/ Signed- ~~~~~~~~~ Title Operations Engineering Manager Date Commission Use Only Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Returnee ~ ORIGINAL SIGNED BY ~~ LONNIE C. SMITH Approved by Commissioner by order of ~_.~ ~ the commission Dat ' Form 10-403 Rev 12-1-85 3-5/STAT17 D. M. Fife (263-4278) Submit in triplicate DS 3-5 CTU Cement Squeeze AFEg 797961 Procedure 1. Make a slickline tag run to verify the PBTD. Last PBTD was 10600' MD (ELM) on 1-5-88. 2. Do a fill cleanout to 10681' MD. 3. Perform a dispersed xylene/HCl, full strength mud acid wash. If the wells caPacity increases dramatically, repeat the acid wash. 4. RIH with coiled tubing and fluid pack the wellbore with filtered seawater. 5. Pump 60 bbls of cement followed by 2 bbls of water and 120 bbls of contaminant. Hold 5100 psi (bottom hole) squeeze pressure for 60 minutes. Squeeze off all perforations as follows: Zone Perforations SPF 4 10306-10316 4 4 10325-10334 4 4 10350-10360 4 4 10370-10390 4 4 10405-10430 4 4/3 10475-10515 0 3 10530-10555 0 2 10570-10595 0 (leaking) (Ref.: BHCS 8-3-76) 6. Jet or reverse out the contaminated cement. 7. Perforate as follows: Zone Perforations SPF 4 10306-10316 Reperf FSD 4 10325-10334 Reperf FSD 4 10350-10360 Reperf FSD 4 10370-10390 Reperf FSD 4 10405-10430 Reperf FSD (Ref.: BHCS 8-3-76) 8. Test the well. Other Well Information: Current status: On production - gas lift. Expected static bottomhole pressure: 3810 psi. Expected fluid in wellbore at reperforation: seawater. ~ :L~ : ~ J ~ ....: : E : .............. : 7 i : ............ ....... :: .......... ii i ii[rJLrll [ i Il 1111111 I II1~11 -- I i ittt it i i II 1. 5000 PS1 7" WELLHE.N:) CONNECTOR FLANOE 2. 5000 PS1 WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF H :l REL ] NE BOP EOU ] PMENT -- 6 5 4 3 2 1. 5000 PSI 7" WELLHEA~ CONNECTOR FLANO[ 2. 5000 PSi 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAIDS 5. 5000 PSI 4 1/6" BLIND RAIDS 6. .5000 PSI 4 1/16" STUFFING BOX | 1 ,I CO]LED TUB]NO UNIT BOP EOU]PHENT ! i i i i i ii ARC!] AI...A..gK A: P., O~ .~OX ~ ~)(-)S6(.) ANf]H[tF~'A~E; AI..A,?I( A 995 DATE- .~-i I:;~FiF-:'EF;~I!:-.NCE' ARCO r.;A,.~EI) t--tOI..E F]'NAI.. I::'t...I::[ASE. .. ,., RE r':E' '[ VED £.'. 01 .I...AR/PIERF'O R'AT ]; ON ['.f'/!.. I.. AF~'/I::'[:R'Ff'IRA'I' T ON [] O l .. I... A R / F' E R F:' 0 R' A T T []N CO!.. !... A F;~/F'EI:-~'FFIF?A"f' T ON [.'. O 1... I... A R / F' [:: R F' fi t:.;' A T '[ Fi N C 01. I... A R' / F' .F.'7 F;,' F' [] R A '¥ I O N C 0 !... I... A R / I::' f.:.: .R F ['~ I:? A T I 0 N COl.. [.. Al;.'/F'ER!::'Ftt~AT T ON C (] I... !... A R / F' IE R F' 01:;' A 'f' T. 0 H ['.t]1. I... AR/F'!:.;F,'F'f'IR A T T ON f..*.. 0 I... I... A R / P E F:,: F' 0 R'. A '¥ .T. 0 N COl.. I... AR/F'ERFF~RAT T RN F' F f)', [;,. Y B.F-. NNFTT A'f' O-- t A'f'l A.? ATI. AR ATt A.? A "f' I. A ."..'.' ATI. AS A 'TI. A .~ ~'' Al'LAX' ATI AS.: A 'r I... A.:. ~ ATI..A.? ATI... A.? ATI .A,S' AT! A · 5 CENTRAl... F' 1:I...E.9 · "'.~- CHEVIq'ON.. . · "~ EX"r E N,.";' I ON EXF'[.OF;.'AT 1; ON -,-'"'EYXON MARiATHON ~... MOBIL :~ F' t--I :!: 1.. t.. 'I: F' ,? r.:, R b.l [;-. 1. I F' 'r t F %' I:? & 'f) ~ f.C A F:' [7. $ ,gTATE OF A!..A,~KA :~ '¥ F"K A P. ~'3 ARCO AI...A.':.,"I<'.A: liNC, I-':'.,0., BOX i u~NL, I-'!ORAGEi AI...A,.":; K A ':::' °'B i (:) I)ATE ! ":'-' qR F;: I!:; F7 E R E i',! .fl.; f'.'.: ' A R f.] f.) P 1:;.'. E ,S" X !..! R 1'7..!) A '1" A E'.'. A i'd C: fi F: n M C. ;" A M f". fi F: A M Et r.'l r'. A M C 0 I:;' E' I::' Iii; R !E i.,.J C I{{ - {-'~ 1'4'. i7, [) C ¢4 ,? E D 14 Fl I. 1!:' !::' T i'q -¢! I... f"! 1::' I:.'~ II I:;~ It 11.7.` II I: ...7' tl I: ::'. II i;;.' II I.;:; II ARCO ALm.ska, Inc t::'. [.I. Box Anchorage, A 9951~ DATE' Hay 29, ~987 REFERENCE: ARCO Pres.sure Da°i'm t-29 ".~- t 6---87 Static BHF' O~i~; ,3-5; ..5- 9--t [~ 5-18-87 S'~mt ic BHF' Otis t2-t2 5.-i 7-87 ,~af ic BHP t6-24 4..-S0-87 F're~su. re B~i Ld--Up O$i F'Lems'e .sign ,'.~nd refurn 'the afl'inched copy a.s receJpf of darn, Received By .................................................. DISTRIBUTION ~' F'hi t Lip s C. en$rat F'i Les -,. Chevron P)" ~.',". ' '"l !~es :I~ I) & M ~.'"'R & I) '* ,S~oh io Ex'ten, ion Exptor'afion ~. .. '"' ~ X X 0 I~ -~ · ,~ ~'~a~e of ALaska H a r a t' h o n -~ T e x a c o '"' Hob i ~ ARCO ALaska, Inc· F'.O, Box iOOS60 Anchorage, ALaska · "~ i 987 DATE Mm y ~, REFERENCE: ARCO Cased HoLe F ina~ ----3-5 4 2-'-~ 7-86 Tubing Cut t'er Run ~S-t2 t2-27-86 Reperf, Record Run t-.2~ t2-3t-86 Perf~ Record Run t 6-t5 5-tt--87 Prod, Spinr~er Survey Run 8-i2 t2-t2-86 CBI' Run t, 5' ~'c: h ,S'ch ,.$' c:. h ,? c h Sch P:£ea-se .sig~ and return t'he mttach,e,,~ copy as receipt of data. Rosanne Peek :/''~ : ATO-t 5~9 fRANS ~8727~J ~ ' Approved ................................................_~. DISTRIBUTION · "' Ce'nrta L Fi Le~: .,,- · ,,-.. Phi LLips · ,,-"" Chevron F'B We I. L F'i Les' D & M I:;.'. & D · ,.'"' E x t e n s i o n E x p L o r mt' i o n :,,":- $ o h i o · "'.,- Exxon -,,. State c.',f ALa~'ka Harm thon ~ Texaco ?,: 'Hob i L STATE OF ALASKA ~ .~ ALASKA t)lL AND GAS CONSERVATION COMMISSION .... , !:,,~' ' WELL COMPLETION OR RECOMPLETION REPORT AND LOG 'W3 1. Status of Well Classification of Service Well OIL ~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-57 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-20222 4. Location of well at surface 9. Unit or Lease Name 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1183' FNL, 1151' FEL, Sec. 14, T10N, R15E, UM 3-5 .. At Total Depth 11. Field and Pool 1469' FNL, 863' FEL, Sec. 14, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 61 ' RKB ADL 28332 12. Date Spudded 13. Date T.D. Reached 14. Date cOmp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 07/19/76 08/02/76 08/12/76'I N/A feet MSL 1 17. Total Depth'(MD+TVD) 18.Plug Back Depth (MD+FVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10950'MD,9291'TVD 10729'MD, 9103'TVD YES E~X NO []I 2199 feet MD 1900' (Approx.) 22, Type Electric or Other Logs Run DIL, BHCS/GR, FDC/CNL, CCL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94.0#Vetco H-40 Surf '6'below pad 30" 390 sx PF II ~.mt 13-3/8" 72.0#Butt MN-80 Surf 2708' 17-1/2" 6281 sz PF il 9-5/8" 47.0#Butt MN-80 & Surf 10908' 12-1/4' 900 sx Class "G" & 275 ~x PF "C" 500-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval size and number) SIZE DEPTH SET (MD) PACKER SET (MD) '10306"-10316'HD 10530'-10555'ND 5-'i i2;;/?:: '10263' 10136' '10325'-10334'HD 10570'-10595'ND '10350 ' -10360 'MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. '10370 ' -10390 'MD *added on 2/09/85 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10405 ' -10430 'MD w/4 spf N/A 10475 ' -10515 'ND TVD of perfs: 8768'-9012' 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) June, 1977 Flowing I Date°fTest !H°ursTested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAs-oILRATIO 07/08/77 2.1 TEST PERIOD I~ 1009.9 806 0 37°I 751 I Flow Tubing Casing Pressure CALCULATED oIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 896 --- 24.HOUR RATE I~ 11542 9210 0 27° 28. CORE DATA Brief descriPtion of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chiPs. None ' RECEIVED ~d':oh0rag~ *Note: We]] was worked over 12/02/86. Tubing was cut, 12/17/86. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE (DAM) WCl/162 Submit in duplicate~. GEOLOGIC MARKERS FORMATION TESTS · · , NAME Include interval tested, pressure data, all fluid's recovered and gravity, MEAS. DEPTH TRUEVERT. DEPTH ! GOR, and time of each phase· Top Sadl erochi t 10292 ' 8761 ' None Base Sadlerochit 10859' 823q' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the fOregoing is true and correct to the best of my knowledge  Associate Engineer INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ' ing and thetocation of the cementing tool. item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 .... STATE OF ALASKA "-~- ALASK.. OIL AND GAS CONSERVATION COMb, .SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing WORKOVER Alter Casing [] Other I~ 2. Narp~e..~f.0Pe, rator, ~KL, U /~laSKa, InCo 3' Ad~l?OY Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 1551' FSL, 762' FWL, Sec. 11, TION, R15E, UM At top of productive interval 1183' FNL, 1151' FEL, Sec. 14, TION, R15E, UM At effective depth 1417' FNL, 899' FEL, Sec. 14, TION, R15E, UM At total depth 1469' FNL, 863' FEL, Sec. 14, TION, R15E, UM 5. Datum elevation (DF or KB) RKB 61 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-5 8. Approval number 590 9. APl number 50-- 029-20222 10. ol Prudhoe Bay 0il Pool Feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10950 ' MD 9291 ' TVD 10828 'MD 9187 ' TVD Casing Length Size Conductor 76' 20" Surface 2682' 13-3/8" Production 10883' 9-5/8" feet feet feet feet Plugs (measured) BP (~ 10275' (WLM) Junk(measured) Spinner logging tool & 20' of line (10808'MD) Cemented Measured depth 390 sx PF II cmt 102'ND 6281 sx PF II cmt 2708'HD 900 sx Class C cmt & 10908'ND 275 sx PF "C" True Vertical depth 102'TVD 2708'TVD 9280'TVD Perforation depth: measured See Attached true vertical See Attached Tubing (size, grade and measured depth) 7"/5-1/2", L-80, tbg w/tail ~ 10276' Packers and SSSV (type and measured depth) SAB pkr ~ 10136' & BAL-O 55SV ~ 2199' 12. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure 13. Representative Daily Average Production or Iniection Data N/A OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 14. Attachments (Workover Well Hi story) Daily Report of Well Operations .~ ' Copies of Logs and Surveys Run DX c. YRO 15. I hereby certify that the foregoing is true and correct to the best of my knowledge c~"-' ' /],'~,,~,0./~-oq~ Signed Form 10-404 Rev. 12-1-85 Title Associ ate Engineer Date i- '7' ~'7 (DAM) 5W0/140 Submit in Duplicate REPORT OF SUNDRY WELL OPERATIONS DRILL SITE 3-5 Iten 11 Perforation Depths: MD 10306 10325 10350 10370 10405 10475 10530 -10316 -10334 -10360 -10390 -10430 -10515 -10555 10570 -10594 TVD 8768 -8776 8783 -8791 8805 -8813 8822 -8838 8851 -8872 8910 -8943 8956'-8977 8990'-9010 SWO/140(p.2) 12-10-86 ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the !irst Wednesday after adowab!e has been assigned or well is Plugged. Abandoned. or Sold "Final Report" should be submitted aisc when operations are suspended for an inde!inire or apprec*abie length of time On ¢v~rkovers when an officia~ test is not required upon completion, report comotetion and representative test data in blocks provided The "Final Report" form may be used for reporting the entire ooeration ~r space is evadable. DistrictAlaska County or Parish Field lLease or Uni! Prudhoe Bay Auth. or W.O. no. ITitle Cap 805009/Exp 903019/Cap AS0~89 WWS #1 IAccounting cost center code S~ate Alaska North Slope Borough ADL #28332 Recompletion ]Wel[ no 3-5 W/O API 50-029-20222 Operator ARCO Alaska, Inc. Spudded or W.O. begun Workover ARCo. W.I 21.66% Date 1.1/26/86 Date and depth as of 8:00 a.m. Complete record for each day reported Intel number of wells (active or inactive) on this CSt center prior to plugging and bandonment of this well our I Prior status if a W.O. 1 0630 Hrs. Old TD Released rig 11/25/86 11/26/86 thru 12/01/86 12/02/86 12/03/86 12/09/86 12/16/86 Set BP @ 10275' (WLM). Press tst tubing to 3500 psi suspect control line/SSSV leak. RD & release GO. RU Otis. Tat lubricator to 3500 psi. Set dummy in Camco BAL-o-valve @ 2210" MD. Bleed off. Tat BP. Rig down Otis. 9-5/8" @ 10,908' 8.5 ppg sea wtr Accept rig @ 0630 hrs., 11/26/86. Kill well w/sea wtr. ND tree, NU &tst BOPE. Pull tbg; tbg parted @ 5052'. RIH w/FTA #2, engage fsh, POOH & LD 159 jts, 5%" tbg. Tat 9-5/8" csg to 2200 psi; OK. RIH w/FTA #3, tag PBR @ 10,089', rotate off K-anchor, POOH, LD PBR. RIH w/BHA, tag pkr @ 10,125', circ, tst 9-5/8" csg & pkr to 2200 psi; OK. 9-5/8" @ 10,908' 8.5 ppg sea wtr RIH, displ well w/diesel. Tst 9-5/8" x 7" ann to 2200 psi. 9-5/8" @ 10,908' 8.5 ppg sea wtr Lnd tbg. ND BOPE, NU & tat tree. RR @ 1430 hrs, 12/2/86. ~ (SSSV. q@: 2199', Top of Pkr @ 10,136') !!~RUl;DA, rm impression block; unable to get past 10,114'. RIH w/impression block; stopped @ 10,082'. RU & make bailer rna to 10,110' WLM; rec'd pipe dope. New TD PB Depth 10828' PBTD Date K nd of rig 1430 Hrs. 12/2/86 Rotary Classifications (oil, gas, etc.) Oil Producing method Flowing Potential test data tType completion (single, dual, etc,) Single Official reservoir name(s) Sadlerochit Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P, Water % GOR Gravity Allowable Effective date corrected - lhe ~;~e is correct ~-~ Date Title Drilling, Pages 86 and 87. , .,,!~.~ ~i!, ilia;., .ii~ ;~: i..ji AR3B-459-3-C [Number all daily well history forms consecutively I Page no. Jas they are prepared for each well. I [ 1 Dlvllto. of AllantlcFI IchfieldCompany STATE OF ALASKA (~...~" ALASKA ulL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. status of Well Classification of Service Well OIL ~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] / 2' ~CL~e ~ Op,erat°r, ' 7. Permit Number /' asKa, , nc. 76-57 3. Address ' 8. APl Number P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-20222 4. Location of well at surface 9. Unit or Lease Name 1551' FSL, 762' FWL, Sec. 11, T10N, R15E, UM Prudhoe Bay Unit , 10. Well Number /~ ~91~ Producinq Interval FNL, 1151' FEL, Sec. 14, T10N, R15E, UM 3-5  Total Depth 11. Field and Pool ~,69' FNE, 863' FEL, Sec. 14, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc,) 6. Lease Designation and Serial No, Prudhoe Bay 0i 1 Pool 61' RKB ADL 28332 12. Date Spudded 13. Date T.D, Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 07/19/76 08/02/76 08/1 2/76*I N/A feet MSL 1 ' [ 17. Total Depth (MD+TVD) 18.Plug Back DePth ('MI~-TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 10950'MD,9291 'TVD 10828'MD,9187'TVD YES~ NO [] 2199 feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run D IL, BHCS/GR, FDC/CNL, CCL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" ~4.'0#Ve~co H-40 Surf 6"below P~d 30" 390 sx PF II cmt '1-~-3/~'' 72.O#Butt MN'80 Surf 2708" '17-1/2" 6281 sx PF II 9-.b/~" 47.0#Butt MN-80 & Surf 10908' 12-1/4" 900 sx Class "G" & 275 .x PF "C" S00-95 . 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) S!ZE DEPTH SET (MD) PACKER SET (MD) '10306'-10316'MD 10530'-10555'MD 5-!/2" 10276' 10136' '10325'-10334'MD 10570'-10595'MD , '10350 ' -10360 'MD 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. '1 0370'-10390'MD *added on 2/09/85 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10405'-10430'MD w/4 spf ..N/A 10475 ' -10515 'MD TVD of perfs: 8768'-9012' 27. PRODUCTION TEST , Date First Production I Method of Operation (Flowing, gas lift, etc.) June, 1977I Flowing Date of Test Hours Tested pRODUCTION FOR OiL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO 07/08/77 2.1 TEST PERIOD I~ 1009.9 806 0 37°I 751 · Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 896 --- 24_HOUR RATE I~ 11542 9210 0 27° 28. ' ' ' COREDATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None *Note: Well was worked over 12/02/86. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE (DAM} WC1/162 Submit in duplicate GEOLOGIC MARKERs FORMATION TESTS NAME : . -.. . . InClude interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sad] erochi t 10292 ' 8761 ' None Base Sadl erochit 10859' 8234' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~~ ~~A(..A~ TitleAssOciate Engineer Date /I INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 sTATE OF ALASKA ..... ALASKA ,.,IL AND GAS CONSERVATION COMMI~ .... ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon .~ Suspend - Operation Shutdown ~ Re-enter suspended well ~_ Alter casing - Time extension ~ Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~ Amend order - Perforate - Other 2. Name of Operator ARCO Alaska, Inc. 3. Addle?SO. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 1551' FSL, 762' FWL, Sec. 11, TION, R15E, UN 5. Datum elevation (DF or KB) 61 'RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-5 At top of productive interval 1184 FNL, 1119' FEL, Sec. At effective depth 1570' FNL, 992' FEL, Sec. At 14, TION, R15E, UM 14, TION, R15E, UM 14, TiON, R15E, UM 8. Permit number 76-57 9. APl number 50- 029-20222 10. Pool P'rudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 10950 'MD feet Plugs (measured) None 9315'TVD feet Effective depth: measured 10620'MD feet Junk(measured) Spinner logging tool and 2[ true vertical 9033'TVD feet of line (10,808'MD) Casing Length Size Cemented Measured dep}~KB3,_, True Vertical(RKB) depth Conductor 76' 20" 390 sx .PF II cmt 102'MD 102'TVD Surface 2682' 13-3/8" 6281 sx PF II cmt 2708'MD 2708'TVD Production 10883' 9-5/8" 900 sx Class G cmt 10909'MD 9280'TVD Perforation depth: measured See Attached 'true vertical· See Attached '*~.*-~.,~ 0ii ~, ?.; ',:~:~:;" ' ..... .... '?':-,,:ss~0s' Tubing (size, grade and measured depth) 5-1/2", 17¢, L-80, tubing to 10136' 4-1/2", 12.6~, HN-80 ta~lp~pe from 10149' to 10276' packers anO SSSV (type ano measureO Oe~th) Baker 9-5/8" S~B packer at 10136' Camco SSSV at 2210' 12.Attachments Description summary of proposal~ Detailed operations program ~_ BOP sketch 13. Estimated date for commencing operation November 24, 1986 14. If proposal was verbally approved Name of approver ~J~C /~//O~C:/'", /~rL)¢~ Date approved 15. I hereby certify that the foregoing is true and Correct to the best of my knowledge Signed ~, ~_,~¢¢~ ~ Title Associate Engineer Commission Use Only (GDH) SA/182 Conditions of approval Notify commission so representative may witness ~ Plug integrity ~ BOP Test ~ Location clearance Approved by ~;~,~ Form 10-403 Rev 12-1-8§ Commissioner IApprOval NO' ,~--~D by order of ~ ¢ Submit in triplicate fee APPLICATION FOR SUNDRY APPROVALS DRILL SITE 3-5 Item 11 Perforation Depths- MD 10306 10325 10350 10370 10405 10475 10530 -10316 -10334 -10360 -10390 -10430 -10515 -10555 10570 -10594 TVD 8768'-8776' 8783'-8791' 8805'-8813' 8822'-8838' 8851'-8872' 8910'-8943' 8956'-8977' 8990'-9010' SA/182(p.2) 11-21-86 DS 3-5 WORKOVER PROCEDURE SUMMARY Prior to Rig Up: 1. RU wireline and set plug in Camco nipple at 10,210' or set E-line bridge plug in the tailpipe directly above the shear out sub. 2. Clear location and prepare for rig. 3. Set BPV. With Rig: 1. MIRU workover rig. 2. ND tree and NU BOPE. Test BOPE to 5000 psi. Pull BPV. 3. RU wireline unit and shift Otis "XA" sliding sleeve at 10,054'. POH. 4. Circulate down tubing and take returns on the annulus. Circulate all CaC1 from wellbore with seawater. Pressure test casing to 2000 psi. 5. Shear out of PBR if not already sheared. POH and laydown tubing. Note for any corrosion. 6. RIH with new seals, IPC 5-1/2", 17.0#, L-80 tubing and GLMs. Crossover to 7", 26.0#, L-80 tubing above the top GLM at +- 3500'. Displace tubing and annulus with diesel. Stab into PBR. 7. Land tubing and test tubing and annulus. Set BPV. ND BOPE. NU tree. Test. 8. Release rig. Pull BPV. Perform long term tubing test. 9. RU wireline. Pull Camco plug or cut off tailpipe directly above the bridge plug. NOTE: Bottom hole pressure = 3950 psi @ 8800'SS Workover fluid will be seawater or NaC1 brine weighted to keep the well overbalanced. Should the packer be milled, NaC1 or Litesal kill pills will be used as necessary. SA/182a :dmr 11-21-86 ANNULAR PREVENTER § BLIND RAt'IS 5 PIPE RAHS 4 TUBII~ HEAD 2 1. 13-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4, 13-5/8" - 5000 PSI PIPE I~AMS 5. 15-5/8' - 5000 PSI BLIND RAMS 6. 1;5-5/8" - 5000 PSi ANNULAR ACCUMULATOR CAPACITY TEST I. CHECK ANO FILL ACCUPIULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. AS~I, JI;IE THAT ACCUI'IULATOR Pg~S~ IS 3000 PSI WI'tH 1500 PSI DOWNSTREAM OF ~ REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TII'IE AND PRESSURE REPIAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUI'lP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LII'IlT IS 45 SECONDS CLOSING TIH[ AND 1200 PSI REP1AINING PRESSURE. ~)~, .~.: ,i i i~'" i I o , , , , 10. 11, 12, 13. 14. BOP STACK TEST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERHINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN ~LLHEAD, ~UN IN L~K-D~ SCR~ IN HEAD. CLUE AN~LAR PREVEN~R AND C~ES A~ BYPASS VALVES ~ THE ~ANIF~D. TEST ALL C~~ENTS TO 250 PSi A~ H~D F~ 10 ~INUTES. INCREASE PRESSURE TO 1800 PSI AND H~D F~ 10 ~INU~S. BLEED TO ~RO PSi. ~EN ANNULAR PREVENTER AND CLUE T~ SET ~ PIPE RAHS. INCREASE PRESSURE TO ~000 PSi AND H~D F~ I0 ~INUTES, CLUE VALVES DIRECTLY UPSTREA~ ~ CHARS. BLEED D~STREA~ PRESSURE TO ~RO PSI TO TEST VALVES. TEST RE~AINING UNTESTED ~ANIF~D VALVES, IF ANY, WITH 3000 PSi UPST~EAffi ~ VALVE AND WITH ~RO PSI D~STREA~. BLEED SYS~ TO ~RO PSI. ~EN PIPE RA~S. BACK~F RUNNING JT AND PULL ~T ~ H~E. CLUE BLIND RA~S AND ~ST TO 3000 PSI F~ 10 ~INUTES. BLEED TO ~RO PSi, ~EN BLIND RA~S A~ RECOVER TEST PLUG, ~AKE SURE ~ANIF~D AN[ LINES ARE FULL ~ ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING P~iTI~, TEST STANDPIPE VALVES TO 3000 PSI. TEST KELLY C~KS AND INSIDE B~ TO 3000 PSI WI~ K~EY PU~P REC~D TEST INF~ATI~ ~ BL~T PREVENTER TEST F~. SIGN AND SEND TO DRILLING SUPERVISe, PERF~ C~PLETE B~E TEST ~CE A WEEK AND FUNCTI~ALLY ~ERATE B~E DALLY. JG JUNE 16, 1986 ARC'.O ALa.ska~ Inc~ 995 ~ 0 DATE~ Oc!'ober 7, ~986 EEFEkL-..NCE' AkCO Pres'~'u'r'e D~'.~ of d 8 '~' a, D 12 T R I B U T I 0 N C e'n !' r a I. F' i L e u :~ I::' h i I. I. i I:) ~: C h ,'.-:, v r o'n I::'B W e t. t. I::' i I. e .s' ,tt. .1t. · ,,. D & M R & ~) 'Il' .. . E x .t: e'n.'.:~' i o'n E x p t. c., r a .I.. i (.-.,'n :'# ,?? o h i o · ,-'"' Ii." x x o n :,",:,!i: ~ ~':~ '[' e o f A I. a .'..~' I< ,::'~ .11, M ~ r a +. h o n .,,. "f' e x a c o ,11. · ,. Hob i L ARCO Alaska, Inc. Prudhoe Bay ,~ngineering Post Office Bo:< Anchorage, A~aska 99510~0360 Telephone 907 263 4248 Donald F. $cheve Operations Encjineerin§ Manager Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 RE: DS 3-5 Permit No. 76-57 Dear Mr. Chatterton: Enclosed is the "Intention" Sundry Notice detailing work proposed on the above mentioned well. Very truly yours, D. F. Scheve DFS/DAR/plt cc: Standard Alaska Production Co. File Pi(DS 3-5)W1-3 DAR/21 ARCO Alaska, lnc, is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA AL,~C"~'A OIL AND GAS CONSERVATION CO' ISSION APPLiC .,i'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _~ Suspend - Operation Shutdown - Re-enter suspended well -- Alter - casing Time extension--_ Change approved program- Plugging _- Stimulate- Pull tubing - Amend order- Perforate x_ Other X_' 2. Name of Operator ARCO Alaska Inc. 3. AddreSSpo Box 100360, Anchorage, AK 99510 4. Location of well at surface 1551'N, 762' E. of SW Cr. Sec. At top of productive interval 1184'S, 1119' W of SW Cr. Sec. At effective depth 11, T10N, R15E, UM 14, T10N, R15E, UM At t0taldepth 1440'S, 880'W of NE Cr. Sec. 14, T10N, R15E, UM 5. Datum elevation(DF or KB) 61'RKB 6. Unitor Propeqy na~e , Prudhoe Day unit 7. Welt number DS 3-5 8. Permit number 76-57 9. APl number 50-- 029-20222 10. Pool Prudhoe Bay Pool feet 11. Present well condition summary Total depth: measured true vertical 10828 feet Plugs (measured) 9211 feet Effective depth: measured true vertical 10800 feet Junk (measured) 9188 feet 28' (Spinner log w/20' wire) Casing Length Structural Conductor 76' Surface 2708' Intermediate Production 10909' Liner Perforation depth: Tubing Size Cemented Measured depth ~ue Verticaldepth 20" 390 sx 76' 76' 13 3/8" 6281 sx 2708' 2708' 9 5/8" 900 sx 10909' 9280' measured 10306'-10316', 10325'-10334', 10350'-10360', 10370'-10390', 10&05'-10430', 10475'-10515', 10530'-10555', 10570'-10594' true vertical 8768'-8776', 8783'-8791', 8805'-8813', 8822'-8838', 8851'-8872', 8910'-8943' 8956'-8977', 8990'-9010' (size. grade and measured depth) 5½" 17# L-80 @ 10069' 4½", 12 6#, MN-80 tailpipe to 10276' Packers and SSSV(type and measured depth) Baker SAB @ 10136' Ca:'aco Bal-O @2210' 12.Attachments Description summary of proposal ~ Detailed operations program _. BOP sketch 13. Estimated date for commencing operation 8/15/86 14. If proposal was verbally approved Name of approver Date approved 15. 1 hereby certi, fy that the foregoing is true and correct to the best of my knowledge Signed ~~,~- ~4. ~Y)c:~vr._ 5 Title Operations Engineering Manager Date Commission Use Only Conditions of approval Notify commission so representative may witness % Plug integrity - BOP Test - Location clearance Approved by order of the commission Date Submit in triplicate Description Summary of Proposal DS 3-5 ARCO Alaska, Inc. intends to squeeze existing perforations on DS 3-5 using a coiled tubing unit (CTU). After the squeeze the well will be cleaned and reperforated. These operations will be performed in the following manner: Wash perforations with half strength mud acid. Cleanout well and load with formation water and diesel. Pump cement and squeeze the following perforated intervals: 10306'-10316'MD 10370'-10390'MD 10530'-10555'MD 10325'-10334'MD 10405'-10430'MD 10570'-10595'MD 10350'-10360'MD 10475'-10515'MD 10475'-10515'MD e e Contaminate the cement to 10700'. Wait 12 hrs. and reverse out the contaminated cement from the wellbore. Reperforate the following intervals. (4 SPF) Ref: BHCS 8/376 10306'-10316'MD 10370'-10390'MD 10325'-10334'MD 10405'-10430'MD 10350'-10360'MD Ye Stabilize production and test. Reperforate the following: (1SPF) Ref: BHCS 8/3/76 10475'-10485'MD DAR/23 4 i 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2, 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ~ I REL I NE BOP EQU I PMENT 510084006 REV.1 II III I I I I ' I iiiiiiiii ii 5 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5, 5000 PSI 4 1/6" BLIND RAMS 6, 5000 PSI 4. 1/16" STUFFING BOX 4 3 2 ii i i 11 iii CO ] LED TUB ]NG; UN ! T BOP EQU ! PMENT 510084005 REV. ARCO A£aska, Inc. P.O. Box 100360 Anchorage, A£aska 995t DATE: June 2 7, t986 REFERENCE: ARCO Cased Hole Final 6-t4-86 ... -9 &-t 9-86 -~9 6-~ 5-86 ~3-2~ 6-t 8-86 '~'"'~-25 5-28-86 ~'---.4- 26 5-2~ -86 ~8-8 5-6-86 Spinner Survey Run t 5" GR Spinner log Run t 5" Spinner tog Run t 5" GR/$pinner Log Run t 5' GR/$pinner Log Run t 5" Cement bond Log Run t 5" Cement bond Log Run t 5' Cemnet bond Log Run i 5' Otis Camco Camco Camco Ca mc 0 Gearhart Gearhart Gearhart PLease sign and return th.e~ at.~tache~d COpy as receipt of data. Received By, HAVE A NICE~ Linda Hu[ce ATD-i 529 TRAN$ ~86403 DISTRIBUTION Central Fi Les Chevron Extension Exploration Ex xon Mara (hon Nob i [ Phi LLips F'B WeLL Fi les R & D $oh i o State of Alaska Texaco ARCO Alaska, Inc, Post Office Bo,, 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 5, 1985 Mr. C. V. "Chat" Chatterton Alaska 0il and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-14 Permit No. 79-82 3-5 76-57 15-7 84-140 Attached are the "Intention" Sundry Notices detailing work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS:JEB:dp Attachment cc: SOHIO Alaska Petroleum Co. File Pi(DS 3-14)Wl-3 PI(DS 3-5)Wl-3 Pi(DS 15-7) Wl-3 ARCO Alaska. Inc, is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-57 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell Surface: 11551' FSL, 762' FWL of Sec.ll, T10N, R15E, UM Producing Interval: 1184' FNL, 1119' FEL of Sec.14, T10N, R15E, UM Total Depth: 1140' FNL, 880' FEL of Sec.14, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 61' RKB 6. Lease Designation and Serial No. ADL 28322 8. APl Number 50- 029-20220 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 3-5 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate []X Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska Inc., intends to install Kinley Button Gas Lift Orifices at DS 3-5 in the following manner: 1) MI and RU Electric Line Unit 2) Set Kinley Button Orifices as follows: - place three %" orifices at approximately 6450'MD (5950'TVD). - place one ¼" orifice at approximately 4865'MD (4650'TVD). 3) RD and unload well. 4) Obtain capacity. 14. I hereby c/ertify that the_foregoing is true and correct to the best of my knowledge. Signed _-.~'~//~//~~-'~' Title Oper. ~,ngr. Mgr. The space below for Commission use Date Conditions of APproval, if any: Approved by COMMISSIONER Approvect C c~.~..' R/eturnled '" By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 16, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT: DS 3-5 Dear Mr. Chatterton: Enclosed is a Sundry Notice for DS 3-5. We propose to add gas lift mandrels to the tubing string. We expect to start this work on November 10, 1985. If you have any questions, please call me at 263-4944 or Eric Witten at 263-4968. Sincerely, . Gruber Associate Engineer JG/EBW/tw SN/L063 Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL ~ COMPLETED WELL [] OTHER [] 2. Name of Operator ARCO Alaska, inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510 4. Location of Well Surface: 1551' FNL, 762' FEL, Sec.ll, TION, R15E, UN 5. Elevation in feet (indicate KB, DF, etc.) RKB 61 ' 6. Lease Designation and Serial No. ADL 28332 7. Permit No. 76-57 8. APl Number 50- 029-20222 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3-5 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Perforate Stimulate Repair Well Pull Tubing Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) [] Alter Casing [] Perforations [] Altering Casing [] Abandon [] Stimulation [] Abandonment [] Change Plans [] Repairs Made [] Other ~L Other [~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to add gas lift mandrels to the tubing string as follows: 1. Set BPV. ND tree. NU BOPE and test. Pull BPV. 2. Pull out of PBR. 3. POH and LD tubing. 4. RIH with new tubing and gas lift equipment (tubing will be 5-1/2" x 7" tapered). 5. Space out and land tubing. 6. Set BPV. ND BOPE. NU tree. Pull BPV. 7. Release rig. A subsequent sundry will be submitted following the completion of this workover detailing the completion details. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. BOP equipment will be tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated Start: November 10, 1985 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed v~o~_~,/~L'/ Title The space belo r Commission use Associate Enqineer Date Conditions of Approval, if any: Approved by_ 6RIGtl~k~ $1Q~ED g;Y LOI~IE C, Approved Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 5N/O~Z Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~- STATE OF ALASKA .... ALASKA--,. AND GAS CONSERVATION CC ¢IlSSION · WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76,57 3. Address 8. APl Number P, O, Box 100360. Anchorage, AK 99510 50- 029-20222 4. Location of well at surface 9. Unit or Lease Name 1551'N & 762'E of SW cr Sec 11, T10N R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1184'S & ll19'W of NE cr Sec. 14, T10N, R15E, UM nc ~.~ At Total Depth 11. Field and Pool I'll. Lease 'Designation and Serial No. ?rudboe Bay Oil ?ool 5. Elevation in feet (indicate KB, DF:~t~::) --' --- Prudhoe Bay Field 6], R~R _~ ~ 28332 . 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 7/19/76 . 8/2/76 i 8/12/76I N/A feet MSL 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where sSsv set 21. Thicknesslof Permafrost 10950'MD;9312'TVD 10828'MD, 9206'TV)YES []{ NO []I ~ feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL, BHCS/GR, FDC/CNL, CCL/GR ,, 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94#VetCo H-40 76'below p~d 30" 390 sx PFII cmt 13-3/8" 72#Butt MN-80 2708' 17-1/2" 6281 sx PFII 9-5/8" 47# Butt MN-80 10908' 12-1/4" 900 sx Class "G" &so0-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING REGORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) *10,306' - lO,316'MD 10,530' - 10,555'MD 5-1/2" 10,276' 10~136' '10,325' - 10,334'MI) 10,570' - 10,595'MD ,, '10,350' - 10,360'MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. '10,370' - 10,390'MI) *added on 2-9-85 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10,405' - lO,430'MD w/4S?F N/A 10,475' - 10,515' MD TVD of perfs: 8768 - 9012' 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) June 1977I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 7-8-77 2.1 TEST PERIOD I~ 1009.9 806 0 37°I ... 751 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 896 0 24-HOUR RATE ~ 11542 9210 0 27° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water, submit core chips. RECEIVED ~daska 0it & ~as Co~s. C0rrlmissi0rl Ancflora~e Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .. GEoLOG'IC MARKERS NAME Top Sadlerochit Base Sadlerochit MEAS. DEPTH 10,292 10,859 TRUE VERT. DEPTH 8761 8234 FORMATION TEsTs .. :' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. None 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge -w ---o ....... r ...... INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Io§ on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no Cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. Prudhoe Bay L,,gineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 8, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-5 Permit No. 76-57 Dear Mr. Chatterton: Attached is a Subsequent Sundry Notice and Well Completion report on the above-mentioned well. Very truly yours, D. F. S cheve DFS/JEB/mjb Attachments cc: Sohio Alaska Petroleum Company File PI(DS 3-5)W1-3 File Pi(DS 3-5)W4-3 RECEIV Anci~mOe ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 1551' FSL, 762' FWL of Sec 11, T10N, R15E, UM (Producing Interval) 1184' FNL, 1119' FEL of Sec 14, T10N, R15E, UM (Total Depth) 7. Permit No. 76-57 8. APl Number 50- 029-20222 9. Unit or Lease Name 10. Wel~ Number D.q 11. Field and Pool Prudhoe Bay Field 1140' FNL, 880' FEL of Sec 1,4: T10N: R15E.. IJM 5. Elevation in feet (indicate KB, DF, etc.) ~ 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool _ 61' RKB ADT. 2R332 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 2-9-85. RU perforating unit and pressure tested surface equipment. RIH w/gun #1, shot interval 10370' - 10390' MD (4SPF). Shut-in well, POOH, all shots fired. RIH w/ gun #2, shot select-fire interval 10350' - 10360' MD (4SPF); pulled up, shot select-fire interval 10325 - 10334' MD (4 SPF). Shut-in well, POOH all shots fired. RIH w/gun #3, shot interval 10306' - 10316' MD (4 SPF). Shut-in well, POOH, all shots fired. Secured well, RD. Ref. BHCS ~-3-76 RECEIVED MAR 1 i 1985 Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. e.,ona O era ons The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 February 28, ]985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT' DS 3-5, 9-11, 9-13, 11-5, 11-6, 12-3, and 12-5 Dear Mr. Chatterton' Enclosed are Sundry Notices for the subject wells. We propose to workover the above wells installing new gas lift equipment and tubing. This work is scheduled beginning May, 1985. If you have an,y questions, please call me at 263-4610. Sincerely, ~-~/T.-L.~¢i t. hian ~ Ar~e~ Drilling Engineer TLF/ELC/tw SN/L0!] Enclosures STATE OF ALASKA .... ALASKA O~L AND GAS CONSERVATION CO~v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska~ Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of Well Surface: 1551' FSL, 762' FWL, Sec.11, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 61 ' 6. Lease Designation and Serial No. ADL 28332 7. Permit No. 76-57 8. APl Number 50-- 029-20222 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3-5 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing J~ Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date ofstarting any proposed work, for Abandonmentsee20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perform a workover on 3-5 in Nay, 1985, to install gas lift mandrels. The workover will be executed in the following manner: 1. Install blanking plug in packer tailpipe assembly. 2. Circulate well to brine workover fluid. 3. MIRU workover rig. 4. ND tree. NU BOP stack and test. 5. Pull 5-1/2" completion assembly. 6. Run 7" x 5-1/2" tapered tubing string with gas lift mandrels. 7. ND BOP stack. NU tree and test. 8. Displace well to crude oil, leaving diesel cap on annulus. 9. Pull blanking plug and install SSSV. 10. Secure well and release rig. RECEIVED Alaska Oil & Gas Cons. Commissio[! ~., Anchorage ...... A subsequent sundry will be submitted following the completion of this workover detailing the new completion details. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. BOP equipment will be tested weekly and operationally tested each trip. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~--~~-'"~/~ ,,,~~~itle Area Drill i ng Engi neer coCnditions/~ Approval, if any: Approved by le~op rovect ~iturned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 (ELC) SN/019 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Chev'¢ on Hob i L '" ;""~ ..... ~'"; L E'xp Lo'~"ation .?e'r'vice.':': Phi LLip.~ 'E x "f e 'n_s' i o'r'l E x i::' L ,:::, 'r a !: i o 'r'~ P '~" u. ,::I h ,:::, ,:-.'-:, E x x o'~ ::;..' .::!:: Ge +. 'f ¥ ' ,S'oh i o f"i...'..'~ ¥' ;~'~ 't' h ::::,'r'~ ~ t a f e o 'r i.::i ~:~.:, i. i. '.:.-.' i"'! c: i::' a ¥' i..:..", 'r'~ d Alaska Oil & Gas Cons. Colnmission ............... .......:, ,:::, ~::. Anchorage f'"i ] LJ .... ~ "~' .,:.., ~ ARCO Alaska, Inc, Post Office =ux 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 June 18, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 3-1 DS 3-3 DS 3-5 DS 3-14 DS 3-15 Permit No. 75-75 Permit No. 76-39 Permit No. 76-57 Permit No. 79-82 Permit No. 79-92 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: Sohio Petroleum File Pi(DS 3-1)W1-3 File Pi(DS 3-5)W1-3 File PI(DS 3-5)W1-3 File PI(DS 3-14)Wl-3 File P1 (DS 3-15)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ..~- STATE OF ALASKA - ALASKA ,_ AND GAS CONSERVATION C(. MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELLi~;~ OTHER [] 2. Name of Operator 7. Permit Nb. ARCO Alaska, Inc. 76-57 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 1551' FSL, 762' FWL of Sec 11, T10N, R15E, UM (Producing Interval) 1184' FNL, 1119' FEL of Sec 14, T10N, R15E, UM (Total Depth) 1140' FNL, 880' FEL of Sec 14, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) t 6. Lease Designation and Serial No. 61' RKB J ADL 28332 12. 8. APl Number 5O- 029-20220 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 3-5 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 3-5 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10306' - 10316' MD (10') 10324' - 10334' MD (20')-.- 10350' - 10360' MD (10') 10370' - 10390' MD (20') 10637' - 10652' MD (15') Ref: BHCS 8/3/76 JUN2 8 LgM Alaska 0il & Gas Cn~s Ccmmissi0n 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of Approval, if any: Approved by. COMMISSIONER Approved ~,,,.~PY By Order of the Commission Date 6-2 Form 10-403 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc~ '--- Post Offi , 360 Anchorage. Alaska 99510 Teiepho~'~ 907 277 553..7' August 8, 1983 Reference' Arco Pressure Data D.S. 3-5 7-15-83 7-15-83 D.S. 9-3 4-21-83 D.S. '13-4 6-30-83 D.S. 5-11 7-3-83 7-3-83 D.S. 7-11 7-17-83 7-16-83 D.S. 13-3 7-13-83 7-13-83 D.S. 6-20 7-1-83 7-1-83 Pressure Build-up Otis Pressure Build-up Survey Report Pressure Build-up Static Otis Pressure Build-up Pressure Build-up Survey Report Pressure Build-up Pressure Build-up Survey Report Pressure Build-up Pressure Build-up Survey Report Pressure Build-up GO Pressure Build-up Survey Report Camco Camco Camco Otis sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. # 461 chevron D & M Dallas Drilling Exxon Getty Marathon · Mobil DISTRIBUTION North Geology Phillips Caroling Smith :'of 4Alaska ARCO Oil and Gas.m"~mpany North Alask. ,strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer April 29, 1981 Reference: ARCO Pressure Data D.S.3-5V 11-28/29-80 Pressure Survey D.S.9-10 11-22/23'80 Pressure Survey D.S.9-4V 2/16/81 g'~ Please sign and return the attached copy as receipt of data. · _ Mary F. Kellis North Engineering Transmittal #228 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY ENG~ MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany MAY -'5 1~81 Alaska 0il & Gas Cons. Commission Anchorage ARCO Oil and Gas Company North Ala s~-~"~=~ist rict Post Offic~ x 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 20, 1981 Reference:ARCO Cased Hole Finals D.S.2-16 2/3/81 Collar Log ,/~D~."~. 3' 5 .? 3/10/81 CCL/Gyro D.S.5-16 ~3/11/81 CCL/Gyro D.S.9-14 3/12/81 Perf & CCL D. S. 12-2 3/8/81 CCL/Gyro D. S. 16-1 3/7/81 CCL/Gyro D. S. 16-2 3/7/81 CCL/Gyro D. S. 16-2 2/6/81 CCL Run 2 Run 1 Run 4 Run 2 2"/5" same log 2"/5" same log 2"/5" same log 2"/5" same log 2"/5" same log 2"/5" same log 2"/5" same(.log se sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #136 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY CHEVRON Alaska Oil ARCO Oil and Gas Company Is a Division of AtlanticRichlieidCompar~y PoM Of~?~Bo× 3B0 Ancimr "ilms'-ka 99510 Telephon=.. g0¥o:'7,_.,, 5537 October 15, 1979 'Reference' Enclosed are Cased ftole Logs for the following ARCO wells' D.S. 2-3 7/2-3/79 Spinner 5" p.s.. :-4 s/z6/79 ', ~~~' 8/9/79 " 5" D.S, 14-5 8/7/79 " 5" D.S. 12-2 8/7/79 TDT~K Run " " " Run 1-B I! U- " Run 1-C 5" O/Piease sign and retu~m the attached copy as rec.eipt. of .data. COMM COMM COMtv~ .... 2 ENO - ..... . i ...... O:OL ..... ST "O' T.'7- C ~r TFC - .',, A T ' K, J, Sahlstrom NOrth Engineering TRANS~,IITFAL # 403 I) I STR'f i;~. fi' [ OX North r'., -~, , Eng. ~.!anager R & 13 (]colony State oE Alaska D & ~I Anchor~~ ,Iaska '395'10 Tc. lep,hor,.¢ 9'37 277 5837 September 20, 1979 Reference' Enclosed are Cased Hole Logs for the following ARCO wells' 4/21/79 Collar Log 6/12/79 CNL Run 4 5" 5/6-7/79 Perforating Depth Control Run 1 6/2/79 Spimner 5" ref 5/28/79 Spinner 6/.19/79 Spinner 5" 6/25/79. " 7/1/79 " 5" Please sign and return ~h~ attached copy as re.ceipt of data. Very truly yours, K. J. Sahlstrom North Engineering TRANSHITTAL # 353 I) ISTRII~t~FION North Geology E~xxon Dri].l ing Mobil. llng.. Manager Getty R & l) Sohio Geology ~xIa :ra t-hca State of Alaska Phillips D & ~[ Chevron ;.-,orih American Procltlcin.9 Division North Alas? .... s~ric[ Post Office. .360 Anchorage, Alaska 99510 Telephone 907 277 5937 July 18, 1978 Reference: Enclosed are Directional Surveyk for the following wells' D.S. #6-5 6-22-78 D.S.~#3-4 ~. 6-22-78 Please sign attached copy as receipt of data. Sincerely, V.G. Reimers North Operations Engineering Transmittal #374 .: ,.__?./:?, / ! ., '£) · F:t'Oill ' fled here~.:ith are the follo:~,ing for the subject well' · Scale Xerox Sepia '-BL Line Acj.d or Fracture Treatment Log - 'Boreho].e Geometry 'Log Carbon Oxygen Log Casing Collar Log Cement Bond Log ....... Compensated Neutron Log - C~sed Hole Core ~malysis - Interval Core No. - Core Description (&qC) - Interval Core Description' (Cony.) - Core No. Directional Survey- Gyro - Single Shot - t~ultishot - : 'Engineering Production' Log Fluid Analysis - .... .Fluid Density Gamma'Ray Location Plat '~'lonthly l~ell TeSt Data Nud Log Perforat ~g Record .... State Reservoir Pressure Report Surveillance Reports __ Temperature Log Transient Pressure Surveys TVD Logs- ~tel Induction I,aterolog - Compensated Formation Density Log - Compensated Neutron-Fo~ation Density Log - Boreho].e Compensated Sonic Log - Porosity Log "l. ease-]Let, tn'n Receipt To: Ms. R. A. Logue Atlantic Richfield Company P. O. Box 360 Anchorage, Alasla ]Date' ~- ZV',T,Z~d-'~ Atlant!~.RichfieldCompany North Ame.ri .~C.~ Producing Division North Alask, trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 16, 1978 Mr. Hoyle H. Hamilton State of Alaska Dep. artment of ~Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 3-1 (31-10-10-15) DS 3-2 (14-10-10-15) DS 3-3 (13-11-10-15) ~~1-13-10-15) I 14-10-15) DS 3-6 (11-14-10-15) DS 3-7 (11-15-10-15) DS 3-8 (31-15-10-15) Permit No. 75-75 Permit No. 76-24 Permit No. 76-39 Permit No. 76-51 Permit No. 76-57 Permit No. 76-60 Permit No. 76-53 Permit No. 76-73 Dear Sir' Enclosed please find a Completion Report for the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /am Attachments STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE i ii i i WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: oti, uas" ~ Other WELL WELL ~ DRY b. TYPE OF COMPLETION: .~w ~ wo= I--I ~=P'~ ~,~,, ~ .,FF. ~ Producing WELI, OVER EN BACK RESVR. Other SUBMIT IN DUY~.I.:ATE* (See ()thor .~t I'LiC tiO rL~ on rever?e side,* 2, NAME OF OPERATOR ^tlantic Richfield Company 3. ADDRESS OF OPERATOR P 0. Box 360; Anchorage, Alaska 99510 4. LOC^'r~oN or WSLb (Report location clearly and in accordance with any State requirements)* ~i~e~l & 762'E of SE cc Sec. 11, TION, R15E, UM At top prod. interval reported below 1440'S & 880'W of NE cc Sec. 14, TION, R15E, UM 5. API NLrlVLEI~ICAL CODE 50-029-20222 6. LEASE DESIGNATION A_ND SERIAL NO. ADL 28332 7. IF IND1AaN, ALLOTTEE OR TRIBE NA~II~ 8. UNIT,FA-R2~[ OR LF_akSE NAME Prudhoe Bay Unit 9. WELL NO. DS 3-5 (31-14-10-15) 12, P~'IR/VIIT NO. 76-57 ]~-'FOTAL DEPTH, NLD & TVDFg. PLU'G, BACK MD & WD[20, IF 1VL~L~IPLE CO~7~' ! 21. ?;NTERVALS DRILLED BY - 10,950' MD, 9312' TVD110,828' MD,~,'uo"'"'"'-, ..-,,,k/vt~ ~ow ~mv?Y.. ~lng~ e Il .OT,.:~ Al?°'°'L'~/ '1[ --- N~ne~'^""~ TOO,.~ 22,PRODUCINO !!',:TERVAL(S), OF TIuIIS CO,1ViPLETIO~--TOlO, BOTTOM, NAME (MD AND TVD)* 123. ~VAS D.RECTIONAL ! SURVEY MADE 10292'~B (8761' TYD)Top Sadlerochit 10859'~ (8234' TYD) Btm Sad]erochit ~ Yes 24. TYPE ELECTRIC AND OTIIEI% LOGS RUN i,! CASLNG SIZE 20" 'i3-3/~" 9-5/~" DIL, BHCS/GR, F.DC/CNL, CCL/GR ,,, CASING R~CORD (Report J{'{ strings set in we]Il) ...... lb/ft-thd ~ G~D"'I ~ sE:, <~ I ~o~:z~ [ ~:,~:~:~ ~o~.~ 94~-Vetco / H-40'[76'be']~w'p~30" ~ 390 sx PF II nmi 47~-Butt IMN-80 110,908'. I 12'1/4"1 900 sx Class "G" [s00- l - i A.?A'OUNT PULLED 26. .L'INE~ R/EC OP~D 28. PERFORATIONS OPw-2N TO PRODUCTIOH (interval size and number) 10,570'-10,595' ,~.~,.~ 10,530'-10,555' 10,475'-10,515' 10,405'-10,430' ~/4 shots per ft. 27. ~TUBINI RECO[LD SCiiEEN (i%'ID) SIZE DEPTH SET (MD) , , i PACKER SET 29. ACID, Si:OT, Fi~A27'iURE C~,iENT SQUr'¢Z~ DP-,~I'%i iNTF~V.~L (MD) AMOUNF il!ND I';:!ND OF M~U.E?~.AI, USF-2D,-. ! i i i i i i i i i iii i ml i · 30. PI~ODUCTION .~.~~I~ST~PI;'ODUCTION=_.L,: [[ P~ODUCTION MEIHO'D (Flov:i:~g, ~as lifc pumpir~g--size and type of pump "']~'~L~., ~'['ATUS (Produqing or I ::,:aL-in) ? } :' dune, 1977 ~'>= ~t ~Flowinq I Producing 7-8-77 ~2.1 I 37~ 11009.9 I 805.~ j.,, t 7s~ '-'-~8~ lCASUqG PRESSURE ICALC:~ OI~SBL. GAS--rvTCF, W~-- . lo:L GRAVITY-~I (CO~.) 89~*~' ] 0 j~<-~°~'l~ [ 11542 [ 9210 I ~ I 270 APl 21. DISPOSITION OF GAS (Sold, u~ed ]Or ]uel, vented, etc.) I TEST WITNESSED BY ~ected 32. LIST OF ATTACHMENTS 33. I hereby certt~ that t~he foregoing and attached information is complete and correct as determined from all-available records s,;~,Z~//~ ~LE District Drilling Engineer ~Tz 2-15-78 i *(See Instructions and Spaces lot Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- merits given in other spaces on this form and in any attachments~ Items 20, and 22:: tf this well is completed for separatc production' from more than one interval zone (multiple completion), so state in item 20, and in iteq~ 22 show the prcJuci~,g interval, or i~tervals, top(s), bottom(s) and name (s) (if any) for only the intervc~l reported in item 30. ,Submit a separate report ,., (page) on this form, adequately identified, for each additior~al interval to be seperately produce, J, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMAR'Y 09" F'O~MATION TESTS INCLUDIN(; INTEt-~VAL TESTED, PHESSURE DAT~ ~ ~OV~I~ OF OIL, GAS, 35. G~GIC MAHK~ WAT~ AND MUD ._ NAM.E ,,, , 36, CORE DATA, Aq~FACI[ ~H1EF D~CR[PI~ONS OF LITIIOLOGY, POROSITY, AND [)~['E~'ED S[tOWS O~ OIL. G~ OR DRILL SITE #3-5 PERFOP&TtON AND CLFJCIW RECOPd) April 23-24, 1977 D.S. #3-5 was drilled to a bottom hole location in the northeast co~er of Section 14, T10N, R15E, Pru~oe Bay Field. Depths of interest are: Top of Sadlerochit Gas/Oil Contact Perforations Water/Oil Contact Base of Sadlerochit Junk Left in Hole Measured Depth Subsea Depth Zone 10292' 8696' UBS Not Present - - 10405-10430' 8790-881].' UBS 10475-10515' 8848-8882' UBS-Cong. 10530-10555' 8894-8915' Cong.-UBS 10570-10595' 8928-8949' LBS 10694' 9032' LBS 10858' 9173' S~ None The first gun was positioned to perforate the intervals 15570'-15595' M.D. with the choke opened to 36/64" initially, i}~en fired, the pressure surged; however, the well flm~ed at 0 FTP. The turbine meter rate indicated 6000+ BOPD, but fell to 1700 BOPD in 38 minutes. Later tank gauges indicated that the turbine meter was progressively plugging and actual fl~ rate was n~ch higher. ~e well was SI to run the second gun prior to cleanup. ~ile the second gun was being run, a tank strap indicated that 110 bbls. diesel had surfaced at 7200 BFPD. Positioned the gun to perforate 10530'-].0555' M.D. SITP was 960 psi. The well was opened on 3/4" choke and 5 minutes later the FTP was 440 psi. An attempt was made to perforate and no response was seen. The gun proved to be wet and did not fire. The well continued to flay, but due to turbine meter/totalizer problems, the rates were unkno~m. Eighteen minutes into the second flow, CaC12 water and some gas surfaced. FTP increased rapidly and the choke was reduced to 36/64". Well stream content was sanpled and analyzed from this point until consistent samples indicated the presence of no water. The well was flmved for 55 total minutes on the second flow producing an addi- tional 211 BF at average rate of 6048 BFPD. Final FTP was 1080 psi. Of the 211 BF, 125 bbls. is estimated as diesel, 31 bbls. CaC12 water, and 55 bbls. of reservoir fluid. A Fluid Density log was run indicating CaC12 at 10595' with a transition zone to oil at 10550' M.D. The third gunwas positioned to perforate the interval 10530'-10555' M.D. SITP was 1300 psi. The well was opened on 44/64" choke. Seventeen minutes later, the gunwas fired at FTP 900 psi. The pressure increased to 1000 psi in 2 minutes. The well was floxmd for an additional 1 hour 37 minutes on 36/64" after perfora- tion to insure that bottoms were surfaced. The average rate was 4564 BOPD with samples indicating no water. Final FTP was 1250 psi. ~ additional 355 bbls. of reservoir fluid was produced during this period. D.S. #3-5 Perforation and Cleanup Record Page 2 The fourth gun. was positioned to perforate 10495'-10515' M.D. SITP was 1380 psi. The well was opened 56/64" choke and FTP was 980 psi 7 minutes later when the gunwas fired. No pressure response was noted, and FTP was 720 psi 5 minutes later when the well was SI. The fifth gunwas pOsitioned to perforate 10475'-10495' M.D. SITP was 1410 psi. The well was opened on 56/64" choke and FTP was 900 psi 4 minutes later when the gunwas fired. The FTP has increased to 980 psi 5 minutes later when the well was SI. The sixth gun was positioned to perforate 10405'--10430' M.D. SITP was 1400 psi. The well was opened on 48/64" choke and FTP was 1160 psi five minutes later when the gun was fired. Pressure increased in 3 minutes to 1180 psi but had fallen back to 1165 psi 2 minutes later when the well was SI. An Amerada pressure bomb was used to obtain the 8800' ss static pressure, 4390 psi. The well was flowed for 1 hour on 36/64" choke at an average rate of 5688 BOPD, resulting in 237 barrels oil production. The initial FTP was 1250 psi but had increased to 1360 psi just prior to SI with a wellhead temperature of 47°F. The Amerada showed a maximum drawdo~ of 153 psi resulting in an approximate PI of 37.2 STB/psi. The maximum reading thermometer recorded a BIFF of 198°F. Final SITP was 1420 psi. The total estimated volumes of oil and gas produced during perforating operations were 827 bbls. oil and 620 MCF gas. S/27/77 OIL, North Alaska District Engineering T RAN S M I T T A L To- From: J. A. Rochon/D. R. Jadkson Date' b~ay 31, 1.9,.77 Well Name' D.S. #3-5 Transmitted here~ith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDI, Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (~C) - Interval Core Description (Conv.)- Core No. Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gamma Ray/CCL Laterolog Location Plat lEcrolaterolog b~crolog bMdlog - Interval Sample Log (A.R. Co.) - Interva~ Synergetic Log TVD-DIL TVD-Porosity Log Fluid Density XX Collar Log Receipt Acka~owledged For: Date: Please return receipt to: ¢grth Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 Xerox Sepia BL Line ea. t ea. ea. / ea. #429 .... ~X~,y .6, 1.977 N~rth Alaska Dis t~ict ....... ~_ TRAN SM I TTAL I)~te ' _ .... .-. C'~ k,7--~ .. ~- ,~ Transmitted here~.~ ~re ~e following for ~e'..,Subj~c well: Ru~ 1~o. . o .---- . ](erox BHC SOnic/Caliper BHC Sonic/Caliper - Gamma Ray-Lpg BHC Sonic/Gaam~ Ray. Log · Calip_~r/CCL .... . Cement Bona LoE/VDL . .Compens~tea=:' Neutmo~-~orm~tion Compensatea ~eutron Log · - . Core Analysis - Interval · - ...... . . .. -.' ' ~ '-,~- - Core' 1Yo. Core D~scrzp~zon Cconv-) - core No ,_.. Dire. ctional Survey- 6~/ro .... · . Single Sh6t ~altishot . Drill Stem'Test - Test No. ' - '-Dural Induction Lmte~olog :-_ . _ . ~ormation Densit~ Log . ~orma~om Density Aoz/Gmm~m Ray ]5~terolog ;..... Location Plat l~licr.' olaterolog . .- Nicrolog ~fuS.log- Inter~al Sample Log (A.R.Cd~)'inte~a&) '. - ' '.syn. erget~c Aog W~D-Porosi~ Log _~r¢~sure. R,)_~]dup. Survey: .April. 2__4, _1_9_77_ ; Receipt Acknowledged For: Date: 'Please return receipt to' . . Atlantic Richfield Co.,,~pany North Alaska Engineering P. O. };ox 360 #300 , Atlqnt~:Rid~fieldCompany North Arneri~ Producing Division North Alask strict Post Office L,~.x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 5, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 300'1 Porcupine Drive Anchorage, Alaska 99501 Subject' Drill Site 3-1 (31-10-10-15) Drill Site 3-2 (14-10-10-15) Drill Site 3-3 (13-11-10-15) ~~11-13-10-15) ~ Drill_ Site 3-_~31:14-10-15) ~-~ii Sl~-6 (11-14-10-15) · 4 i · .. R[V D ~: A F T S¢ C Coi,;~ ~i':: ................ FILE: Pe~mie No. 7'~---*~d~.6 24 Permit No Permit No 76-39 / Permit No 76-51 Permit No. 76-57 Permit No. 76-60 Dear Sir' Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure i:iECEiVED Cf Form 10-403 REV. 1-10~73 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) E GAS N 1. ~/~ggL WELL g.J OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Ala'ska 99510 4. LOCATION OF WELL At surface 1551'N & 762'E of SE cr Sec. 11, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 61' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20222 6. LEASE DESIGNATION ANO SERIAL NO. ADL 28332 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. Drill Site 3-5 (31-14-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 14, T10N, R15E, UM 12. PERMIT NO. 76-57 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF FRACTURE TREATMENT SHOOTING OR ACIDIZING (Other) REPAIRING WELL ALTERING CASING ABANDONMENT* Perforate (NOTE; Report results of multiple completion on Well Completion or Recompietion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all Dertl~lent ¢letalls, and give pertinent dates, including estimated date of starting any proposed work. Began operations on 4/19/77. Tstd tree & perf mani~f~U & tstd BOP to 5000 psi OK. Pulled dummy valve. Ran 'CC"[ from~ 9940'-10,687'. <~erf~n-n-n-n-n-n-n-n-n-fitervals 10,570'-10,595', I I I I ~ 10,530 -10,555 , 10,49_~_~.10,51~ , 1.0,475~I~,.10~,.495' ,'~i[T, 405'~10,430' w/4 shot per ft. Ran Amerada bomb. Flowed well. Ran & set flapper valve. Press tstd balance & control lines to 5000 psi OK. Bled press to 0 psi above flapper valve. Installed & tstd tree cap to 5000 psi OK. Released well to the Production Dept on 4/27/77. 16. I hereby certify that the foregoing is true and correct SIGNED T~TLE District DrillinQ EllqilleerDATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY.' T IT LE DATE .... See Instructions On Reverse Side P. O. BOX .,St ANCHORAGE. ALASKA 99509 TEL[PHONE I9071 278-3525 Individual Well Data Sheet MILE 4. NORTH RD. BOX 3453 KENAI. ALASKA 996tl PH. 19071 283-4403 Company. ATLANTIC RICHFIELD CO. -Location Well # 5 _Field.. PRUDHOE BAY D.S. # 3 ..State_ ALASKA Borough - ~- NORTH~ SLOPE . Formation_ ,_ SADLEROCHIT . TIME.. '~ ..-/21~ HR. MIN. TBG PRESS 24 APRIL 1977 RIG UP ~.UBRICATOR TEST ~.UBRICATOR. SIH W/INSTS STOPPED @ 10,600MD-8954 (4433-'PSIG) STOPPED @ 10,615MD-8967RD (4440-PSIG) 1600 1645 1715 1855 1915 ~.-.: 1924 1930 ~ 1936 ~-- 1942 1948 1954 ~ 2000 _? 2006 2012 2018 ~ - 2024 2030 WELL SHUT IN OPEN WELL TO FLOW 00:00 FLOWING 00: 06 " " 00:12 " " 00:18 " " 00: 24 " " 00: 30 " " 00: 36 " " 00:42 " " 00: 48 " " 00: 54 SHUT WELL IN FOR B/U 01:00 1449 2030 2031 2032 2034 2036 2038 2040 2042 2044 2046 2048 2054 2100 2106 2112 2118 2124 2130 2136 2142 BUILD UP 00:00 " " 00: 01 " " 00:02 " " 00: 04 " " 00: 06 " " 0 0: 08 " '* " 00:10 " " 00:12 " " 00:14 " " 00:16 " " 00:18 " " 00:24 " " 00: 30 " " 00: 36 " " 00: 42 " " 00:48 " " 00: 54 " " 01: 00 " " 01: 06~ . ,, 01: 12 Date ... 24 GAUGE 40021 BHP@ R.D. 10,615MD -8967 4440 4440 4306 4304 4300 4296 4291 4287 4296 4345 4334 4331 4399 4416 4422 4424 4428 4429 4430 4431 4433 4434 4435 4436 4436 4436 4436 4436 4437 4437 4437 APRIL 1977 DATUM 10,4i7MD -8800 4390 4390 ' 4256 4254 4250 4246 4241 4237 4246 4295 4284 4281 4349 4366 4372 4374 4378 4379 4380 4381 4383 4384 4385 4386 4386 4386 4386 4386 4387 4387 4387 P. O. BOX A, AHCHORAG£. ALASKA Individual Well Data Sheet MILl 4, NORTH RD. BOX 3453 KENAi. ALA$.KA 9~6lI PH. 1907! 283-4403 Company. ,. Well .... ATLANTIC RICHFIELD CO. # 5 Field Borough . NORTH. SLOPE . Formation,, DATE TIME ELAPSED TIME HR. MIN. Location PRUDHOF~ BAY SADLEROCHIT TBG PRESS PSIG D.S. # 3 State ..... Date , GAUGE 40021 BHP@ R.D. 10,615MD -8967 ALASKA 24..APRIL 1977 BHP@ DATUM 10,417MD -8800 2148 2154 2200 BUILD UP CON ' T I1 II SOH W/INSTS BHT 198° 01:18 01:24 01:30 4437 4437 4437 4387 4387 4387 ,lB STATE DEPART~,.'IENT OF NATURAL RESOURCES Division of Oil and Gas Conservation TO: [-- Hoyle Di rector Thru: Lonnie C. Smi th Chief Petroleum Engineer FROM: Ben LeNorman Petroleum Ins~ctor DATE : May 3, 1977 SUBJECT: Subsurface Safety Valve and Surface Controlled Safety Valve Tests on Arco' s 3-5 .Tuesday, Apr~ilp 26, 1977 - I departed, mY home at 2:15 PM for a 2-45 PH showup and 3:45 PM departure via Wien flight 109 for Deadhorse. ! arrived in Deadhorse at 6:10 PM and proceeded to drill site #9. W_9_edn~sday, Apr~i]_ 27,_..19~7 - After earlier testing of DS 3-2, 3-3 and 3-4, testing 6f 3-5 began at 4 : 00 ~ PM wi th the SSSV open and shut in tubing pressure of 1450 psig. The SSSV on DS 3-5 is set at 2210'. SSSV was then closed and pressure downstream bled to 1000 psig and monitored for 5 minutes. The SCSV was then closed and pressure, downstream bled to zero and monitored for 5 minutes. The master valve was then closed and tests were concluded at 0:45 PM. A field inspection report was prepared with the original given to Minos Hebert, a copy mailed to Bob Hines, a copy attached to this report. In summar_v: I witnessed successful testing of SSSV and SCSV on Arco's DS 3-5. Thursday and Friday, April 28 and 29, 1977 - Tested SSSV's on BP's H-4, N-2 Saturday, April 30, 1977 - i 'departed Deadhorse at 11:00 A~4 via BP charter 'ar~i~i'ng-i~i Anc~h~o~age-~a~' 12:35 ~i and at my' homm at 1:05 PM. Operat6r ~ Satisfacto Yes No ')' LocatiOn,Genera Wel 1 Sign ~ d ii:Gas: Co S: . , Satisfacto'~y .]'~, Type Inspection YeS'~ '~N°'~Item ( )'BOPE Tests ( ) ()~-~:~~. "C ''. - ~'"~ as~ng set e ( ) ( ): 2. General Housekeeping ( ) ( ) , 16. Tes~ 'fluid-( )wtr.--~ )mud ( ) oil' (') ( )'-. 3. Reserve Pit-( )open( ).filled ( ) ( )~ '17. Master Hyd. Control Sys.- psig ( ) ( )].:."~ 4. Rig . ( ) ( ) 18. N2 btls.__,__, _,_____psiq (~S'afety Valve Tests ( ) ( ) 19. Remote Controls " (~' ( )." 5. Surface'-NO. Wells t ( ) ( ) 20. Drillina spool- "outlets (~J~(). 6. Subsur.face-No. 'Wei'ls I ( ) (') 21. Kill Li.~e-( ) Ch6'ck' valve _( ) Well Test Data ( ) ( ) 22. Choke Flowline ( ) HCR valve ( ) ( ) 7. Well Nos. ( ) ( ) 8. Hrs.. obser () () 9. BS&W ( ) ( ) 10. Gr. B~-~.' , ~ ( ) (-) 23. Choke Manifold No. valvs flas · ( ) ( ) 24. Chokes-( )Remote( )Pcrs.(~dj' ( ) ( ) 25. Test..Pluo-( )Wellhd( )csg( )none ( ) ( ) 26. Annular ~reventer, ~sia (') Fina~-~TB-;~-on~ent ' ( ) ( ) 27. Blind Rams, psia ( ) ( )' 11. P~rker ( ) ( ) 28. Pipe Rams psiq ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kel'ly-cock ~]~sig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve psia ( ) ( ) 14. Pad leveled ( ) ( ) 31 Safety Floor valves-Z-(- -~-BV i )Dart Remarks_Total inspection observation time hrs/~ Total numb~r~ leaks and/or equip., failures S",.?.:CV'- .?,_ , -.__ .__ . : ,,'_'. cc: "~.~ /~J~Nol~ify'in __ days or when ready AtlanticRichfieldCompany North Amer?---- Producing Division North Alask, .strict Post Office Box 360 Anchorage, Alaska 99510 Telephone ·907 277 5637 March 22, 1977 Mr. Hoyle Hamilton STate of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 3-1 (31-10-10-15) Drill Site 3-2 (14-10-10-15) Drill Site 3-3 (13-11-10-15) (31-14-10-15) Drill Site 3-6 (11-14-10-I5) Permit No. 75-75 Permit No. 76-24 Permit No. 76-39 Permit No. 76-51 Permit No. 76-57 Permit No. 76-60 Dear Si re' Enclosed please find a Sundry Notice outlining our plans' for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure RECEIVED Form 10-403 Submit "1 ntentlons" in Trl pllcate REV..,1-10-73 ~ & "Subsequent Reports" in. Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use thls form for proposals to c alii or to deepen Use "APPLICATION FOR PERMIT--" for such Droposals.) OIL I~ GAS r'-] w EL L Ij.,,.J WELL L.-J OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 155l'N & 762'E of SE cr Sec. ll, T10N, R15E, UM 1'3. ELEVATIONS (Show whether DF, RT, GR, etc.) 63' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re NOTICE OF INTENTION TO.' 5. APl NUMERICAL CODE 50-029-20222 6. LEASE DESIGNATION ANd SERIAL NO. ADL 28332 7. IF INDIAN, ALLO1 YEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe. Bay 9. WELL ~O. Drill Site 3-5 (31-14-10-15) 10, FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11. SEC., t., R.,' M., (BOTTOM HOLE OBJECTIVE) Sec. 1 ~ T10N R15E UM --~., , , 12. PERMit NO. 76-57 )ort', or Other Data SUBSEQUENT R-~PORT OF: TEST WATER SHUT-OFF ~ FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) Perforate PULL OR ALTER C~SING Li~ MULTIPLE CONI PL---TE ABANDON* CHANGE PLAN5 ,, WATERSHUT-OFF ~ FRACTURETREATMENT SHOOTING OR AClDIZING (Othe~ REPAIRING WELL ALTERING CASING ABANDONMENT* (NOTE-' Report results of m~'.i~le completion on Well Completion or Recompletion -~eport and Log form.) 15. DESCRIBE ProPOSED OR COMPLETED OPERATIO,~$ (Clearly state all pertinent details, and give pertiner~: clates, including estimated date of starting any proposed work. Atlantic Richfield Company p~poses to perforate-selected intervals within the Sadlerochit interval. Ail perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. ~ ~C'E I V~D Estimated start date' May 2, 1977 MAP, 9 1977 D:vlsion of Oil and Gas Conservation Anchnr~y!e 16. I hereby certify that the foregoing Is true and correc~ SIGNED . ~~ T,TLEDistrict Dril linq En§in.eer.. DATE (this space for State office use) APPROVED BY ~/~', ~ -. -~ - ~CONDITIONS OF APPROVAL, IF AN~ TITLE P=~I'UI~UII! Eti~;'ll~: I' See Instructions On Reverse Side DATE ~pptoved Copy Retumed ~.. To: ATIJ~TIC RIC}~IELD CCt~{PA~7 North Alaska District Engineerin~ TRAN S M I TTAL From: J.A. Rochon/p. flellstrom Date' Oct. 14, 1976 Well Name'Drill Site # 3-5 Transmitted herewith are the following for the subject well' R~m No. Scale Xerox Sepia BL Line 3 BHC Sonic/Caliper Log BHC Sonic/Caliper -' Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Co~0ensated Neutron Log Core .Analysis - Interval Cr,'~"-~ No Cm-e Description ;'~:;~"~ ~,~u,~ - Interval Core 13escription (Com~',) - Core No. Directional Survey- Gyro Single Shot Ymltishot Drill Stem Test - Test No. Paal Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray G~n~na Ray/CCL Laterolog Location Plat ~[icrolaterolog ~iicrolog Mudlog- Interval Sample Log (A.R.Co~.)-Interval) Synergetic Log ]VD-DIL TV])-Porositn/ Log Receipt Acknowledged For: Please return receipt to: Atlantic Richfield Company' North Alaska Engineering Manager P. O. Box 360 ~ Anchorage, Alaska 99510 #' 16 'To' .orth Alaska DisL. r~ct Enilineer5 CONFIDENTIAL DISTRIBUTED TO: STATE OF ALASKA '. DIVISION ~OF_~ TRANSMITTAL ~rom: J. A. Rochon/W. Toliver Date' 23 September 1976 Well X~ne' D.S.tt3-5 .(31-14-10-1,5) . Transmitted herewith are the following for the subject well' .Run No. ' Scale Xerox BHC Sonic/Caliper Log~ BHC Sonic/Caliper ' Ganma' Ray Log BHC Sonic/Gamma 'Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No, Directional Survey - Gyro Single Shot. Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Fomation Density Log/Gamma Ray Gamma Ray/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Interval S~mple Log (A.R.Col)-Interval) Synergetic Log TVD-DIL TVD-Poros'ity Log 2,,$[5,, Sepia BL Line Receipt Ackmowledged For' Date' ,_~_ ..:~/ , _/_~ ~ //~?__~.. __ Please return receipt to' A~Im~tic 1Lichfield Compcmy 'North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 By' Te~eBhene 90! 2F,;/ 5631 September 10, 1976 Mr. Hoyl e Hami 1 ton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, A1 aska 99501 Subject' DS 3-5 (31-14-10-15) Permit No. 76-57 Dear Sir' Enclosed please fi nd a Well Completion Report along with a Drilling History for the above mentioned well. Very truly yours, Enclosures C. 2 '~2G ?GL .... k.i'V DRAFT SEC" SUBMIT IN 1. ~ E* _ STATE OF ALASKA ~,,,-,~,;h~r m- s, ructions on reverse side; OIL AND GAS CONSERVATION COMMITTEE WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* ii i i ii i ii i IR. TYPE OF WELL: OIiL ~ GAS ~ ~ W ELI, W ELL DR ~ Other b. TYPE OF COMPLE~ON: ~w ~ wo=~ ~ ~=~_~ ~'=" ~ "~' ~ Susp~ W E L [. OV ER E N BACK nESV g. Other .... 2. NAME OF OPERATOR ^tl anti c Ri chfi el d 3. ADDRESS OF OPERATOR P.' 0. Box 36.0, ^nchoraqe, AK 995]0 4. LOCATION O¥ WrLL (Report location clearly and in accordance with any State requirements)* At surface ,t~oBpSplrIoaN. m~a~j~t[~fbe~I$ cr Sec ll, TION, RlSE, UM I ~tl~!t8~4,~& ll19'W of NE cr Sec 14, TION, R15E, UM 1440'S & 880'W of NE cr Sec 14, TION, R15E, UM 13, D.&TE SPUDDE.D 7-19-76 18. T©TAL DEPTH, NLD & TVD]Ig. PLUG, BACK IYID & 'l'SZDp, ~ IV[ULTIPLlg CO3/I_.PL., 10,950' & 9312' { 10,828' & 9206' I ~ow~x~.Single 22, PRODUCING !NT~RVAL(S), OF THIS CO.MPLIgTIO~N'~TO,I:', BOTTOM, NAME (MD AND TV-I))' 10292'MD (8]61' TVD) Top Sadlerochit 10859'MD (21234' TVD) Bottom Sadlerochit 24. TYPE ELECTRIC AND OTHEB, LOGS R~UN 5. APl NUM_F~LICAL COD~ 50-029-20222 6.LILASE DESIGNATION AND SERIAL NO. ^DL 28 3332 7,IF INDIA.N, A.LLOT~EE OR TRIBE N~'~ UNIT,F~{ OR L~XSE NAME Prudhoe Bay 9. WEXago--N'O .-'-., f/DS 3-~"'"~ 31 -1 :2 0- s) Prudhoe Bay - Sadlerochi'; 11. SEC., T., R., M., (BOTTOM HOLE P00 l OBOI~CTIVE) Sec 14, TION, R15E, UM 12. PERiViIT NO, 76-57 lgLEVATIONS (DF, }{KB, I~'F, GR, ~TC)* 17. ELEV. CASiNGHEAD 8-2-76 8-12-76 61' RKB, 28' Pad Elev ~ ........ 21. TOOLS ROTARY A11 INTERVALS DRILl,ED BY CABI,E T00I.S None ~ 23. WAS DIR]ZCTIONAL ~ SURVEY MADE . ~ yo_s , 32. LIST OF ATTACHMENTS DATE OF TEST, FLO\V, TUBING t~RESS. ~l. DISPOSITION OF 30. PP~OD UCTION DAT'E FIRST PI~ODLrCTION I PTIODUCT1ON MEi[IO'D (FlowiiCg, g:z:; lif~, pumping--size and type of pump) iX~,ELI. STATUS (Producing or ~ouRs q'EST~ 'lcI~!OXE SIZE IPROD'N FOR OI~BBL. GaS ~$ol'~, used )or 7ue~, vented, etc.) DEPTIi 1NTF~RVAL (MD) AMOUNF AND I'2!ND OF ASATE3LiAL USF~D N^ Drilling Hi story ~3. I hereby certify ~lat t~e foregoing and attached Information is complete an4 correct ~ determined from all-avalla'ble 'record~ - ~dT: Il--,, ' ,,,~-, ,,~ - --- ,, *(S,, ~,tructions OLd Spore, ~or Additional Da,~ on Reve,,, Side) / NA ,, 28. PERFOR.AT~'ONS OPFAXl TO PRODUC~I~Olq'' (interval, size and number) DIL, BHCS/GR, FDC./CNL~ .CCL/GR . . 25. CASING RIgCORD (Report all strings set in well) 20" 94# - Veficfl H-40 17fi'bel~w ndl 30" .. ,3qfl sx Pormafrost TI cmt 13~3/8"172# . Butt[ MN'SOl?708' . [ 17k" 16281 sx Permafrost II . 9-5/8" 47# Butt ! ~N-80[10.908[ I 12~" [900 sx. Class "6" ,,!,, &lsoo'gsl& O&L-95 [ ,,, I ..... I ..... LINER 1RECO~%D I 27. TUBING RECOILD ACID, Si!OT, 15'i/ACVi CF, E, Cr~- ,iENT SQUEICZ~, ETC, INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end tog on all types of lanJs and Peases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in c. ther spaces on this fof~ anti ir~ af~y att,3ct~en~s Items 20, and 22:: If this well is completed for separate prcc]ucti©r~ from ~ore than erie ir'~tervaJ zone (multiple completion), so state ~n iten~ 20, and in ite,~ ?? show the p~c:]c~cir~,9 interval, or iF~tervats, top('~), bottom(s) and nar'ne (s) (if any) for only the interrupt re~)orted ir~ ite.~ 30 Submit a separate report (page) on this form, adequately identified, for each additior~al ir~te~val to be seperately produce.J, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ,, -~4. SUMMAItY ()1~ ~"O{~.MATI~)N TE~'I'S IN('I,UI)IN(; INTEI'{V~L TESTED, I'ttE~URE DATA ~'~COVERI~ OF OIL, GAS:- 35. G~GIC MA~K~ WAT~ AND MUD , , Sad] eroch~ t ] 0~92 8761 , ~ ,, ~ 36. COnE DATA. A'I'I'ACII BRIEF D~CRIPI~ONS OF LITIIOLOGY, POROSITY, FIIAC~RF~. APP~T ~P~ Base .~ ,>,.,.,~=.~,, ~,,ows o~ ,,,~. ~s o,, ,v,~,._ Sadl er0chi t 10859 8234 , , ATLANTIC RICHFIELD COMPANY DS 3-5 (31-14-10-15) API 50-029-20222, ADL 28332, Permit No. 76-57 Drilling History Spud @ 1230 hrs 7-19-76. Drilled 17½" hole to 2734'. Ran 13-3/8" 72#, MN-80 Buttress csg W/sh'°e @ 2708 and FC @ 2625'. Cemented w/6281 sx PF II cmt. Landed 13-3/8' csg, NU and test BOPE. Drilled cmt, FC, shoe and formation to 2744'. Tested formation to equivalent 11.1 ppg. Directionally drilled 12¼" hole to 10,950' RU and ran DIL/SP, BHCS, FDC/CCL logs. Ran 9-5/8" 47#/ft J&L-95 an~ MN-80 and S00-95 casing with shoe at 10,908' and FC at 10,828. Cemented with 900 sacks Class "G" cement. Cemented through lower FO at 2441' with 275 sacks Permafrost "C", closed and pressure tested lower FO. Pulled up and opened upper FO at 2315, placed 9.5 ppg. Arctic Pack in 9-5/8" x 13-3/8" annulus. Less than 1% water contamination at end of job. Closed FO and pressure tested with 3000 psi okay. RIH with 8-1/2" BIT and 9-5/8" casing scraper to 10,950'. Changed mud to 10.2 CaC1 water. Ran 5-1/2" 17~_~t MN-80-8r~ LT&C A-B modified completion assembly with shear s'ub at 10,276'. Baker SAB packer at 10,149'. ~e a~22~'. ND BOPE, NU and test xmas tree. Ran dummy valve and test BV control lines to 5000 psi. Dropped ball and set packer. Pressure test annulus with 2000 psi, okay. Pressure test tubing with 3000 psi. okay. Ran dummy gun to 10,828'. Released rig at 1600 hours 8/12/76. NOTE' Multishot survey was invalid, plan to run gyrosurvey when possible. Information given for T~VD's and hole locations are based on single shot by Don Baker, Inc. )>~PL.E T ION REPORT 'LA!iTIC RICHFI:T:L:,) 'ROSEOPIC ,..SURVEY ~DIUS CF CUF.,VATUq:~ );,'~PUTED FOP. SDC JUNE 22, 1978 WELL NO. DS-3-5 K. [¢. ELEV. 50. R[:."-'~RD,..~ OF SURVEY ALL CALCULATIONS PERFOR~'.'~O [~Y i ;~ !': ELf:CTROF, IC COMPUTER TRUF ~AS. DRIFT VERTICAL SUB DRIFT To'rAL C©ORDINATE5 C L 0 -:PTH A ?'4 G L '.--'DEPTH SEA D[REC DISTANCE D 'v, DEG. S U R D 0 O O ©.C'O -5O.C:O S22.00E 465.©0 S lO0.OO E 475.~3 L036 0 ~5 1035.97 985.97 $22.00~ ~71.28 S i02.5~ E ~82.31 L8S2 0 ~0 1831.92 1781.92 587.00w 677.:55 S 98.54 E 487.61 ~73~ 0 30 2733.88 26.53.88 S58.00E ~83.29 S 97.05 E 492.9~ ~TA A[2OVE THIS POI,:'4T FRC:M ?£f,. F~ECOP,[)S 12 12 11 11 E S ANGLE. ~_800 I 0 2799.88 2749.,¢8 578.0()E 453.52 $ 97.85 E ~93.42 5 11 26 ~900 3 30 2699.79 2849.79 S77.0()E ~8~.~7 S 101.69 E ~95.02 S li 51 3000 7 ~5 2999.29 2949.29 S76.30E ~86.75 S 11i.21 E ~99.30 S 12 52 ~lO0 10 15 3098.05 '3048.05 S63.OOE ~92.22 $ 125.83 E 508.05 S la 20 320r) 1':) 50 3196.36 31~5.36 S57.COE 501.37 S I~1.~8 E 521.00 S 15 3300 12 C 32~4.38 32~.3g S5~.COE 512.58 S 157.99 E 535.38 S 17 7 3~00 14 15 3391.75 3351.76 S55.00E 525.76 S 176.~8 E 55~.59 S 18 33 3500 16 30 3~B8.17 3438.17 S52.00E 5~1.53 S 197.79 E 576.52 S 20 3600 19 30 ~583.27 3533.27 S51.00E 560.77 S 22i.97 E 603.i0 S 21 35 3700 22 0 3676.78 3626.78 S~.OOE 58~.68 S 2~8.07 E 6~5.1~ S 22 59 3800 25 O 3768.¢7 3718.47 $~P..OOE 612.38 S 276.7~ E 672.01 S 3900 28 0 3~57.95 3807.95 S¢6.00E 662.80 S 309.37 E 713.38 S 25 ~OOO 30 n 3965.~1 3895.41 S45.COE 676.78 S 343.95 E 759.17 S 2~ ~100 32 C q031.12 3981.!2 S~5.oOE 713.20 S 380.37 E 808.29 ~200 34 ~5 ~115.62 406~.62 S~5.OOE 751.75 S ~19.60 E 860.93 S 29 4300 37 15 4195.52 4145,52 S47,00E 792,21 S ~62,23 E 917,20 S 30 15 4400 3B () 4274.72 4224,72 S54eOOE 831,01 S 509,31 E 97a,67 S 31 30 4500 40 C 4352e43 4302e43 SS?eO0~ ~.66e65 m 561.16 E 1032.47 S 32 55 8 12 16 29 39 35 21 20 2'/ E 52 t 1~ E 51 F 43 E 25 E 20 i lie DOG LEG SLV ~:'. P. I TY DEG/iOOFT 0.75g 2 ·; O0 4.250 2.534 ~.627 i.1~7 2.~51 3 · c :l 2 2 · .' 2 · 7 6 '~ 2 ."2 '[ , - CO D~ 3-'5 GYROSCOPIC SURVEY JUNE '22, 19'/c RECORD OF SURVEY ALL CAL~.ULA. TIONS PERFORYED ~SY I B ~ ELLCTRONIC COMPUTER iAS. DRIFT .PTH ANGLE ,600 40 15 ,700 40 4.5 ,800 4.0 0 ,900 4.(,) 15 ~000 4.0 15 ~100 4.0 15 ~200 40 45 i300 41 30 ~400 42 15 i500 42 15 ~600 /+2 15 ~700 42 15 ~800 42 30 5900 42 30 5000 42 30 5100 ~+2 30 5200 42 30 ~300 4.2 30 ~400 4.2 4.5 5500 42 45 5600 ~+3 0 5700 43 0 5800 42 0 8900 41 30 7000 4.1 15 7100 41 15 ?200 40 45 7300 40 15 7400 40 15 TRUE VERTICAL SUB DEPTH SEA DRIFT DIREC DE.G, 4428.90 4378.90 $55.00E a504.94 4a54.94 $55.00E 4581.12 4531.12 S54.00E 4657.58 4607,58 S54,COE 4733.91 4683.91 S53,COE 4810.23 4760.23 S54.00E 4886.27 4.836.2? $54..00E 4961.60 ~911.60 S54.00E 5036e06 2986e06 554.00E 5110.08 5060.08 S53.00E 518~.10 5134.10 S52,00E 5258,12 5208,12 S52,84E 5332.00 5282,00 $51.84E 5405.72 5355.72 SSl.OOE 54?9.45 5429.45 SSI.OOE 5553.18 5503.18 S51.OOE 5626.91 5576.01 SSi. OOE 5700.64. 5650.64. SSi.OOE 5774.22 5724.22 S50.84E 5847.65 5797.65 S50.84E 5920.93 5870.93 549.OOE 5994.07 5944.07 S52,GOE 6067,79 6017,79 SSI.OOE 6142.40 6092.40 S5C.OOE 6217.44 6167.44 SSI.OOE 6292.62 624.2.62 SSI.OOE 6368.09 6318.09 SSO.OOE 64.44.13 6394.13 S4.9.00E 6520.46 6470.46 SSO.OCE TOTAL COORDINATES 902.69 S 614.59 939.94 S 667.79 977.56 S 720.52 1015.44 S 772,66 1053.~7 S 824.60 s 76. 1130.48 $ 929.,:)8 1169.i3 S 982.29 1208.37 S .I036.29 1248.36 & I090.34 12~9.~9~ $ ~i143.68 E 1330.30 S .. 1196,97 1371,48 S 1250,32 1&13,61 S lq56,12 5 1355.64. 154.i.i5 S 158~,67 S 1513e15 1626.36 S 1565e72 1669.2B S 1618,35 1713.0~ S 1670.~1 1756.~1 S 1723.03 1798.4.6 S 1775.90 184.0,82 S 1827,28 1882,86 S 1878.28 1924..36 S 1929.52 2008.26 S 2029.53 2050.23 S 2078,66 CLOSURES D I STANCE ANGLE D I'4 1092,05 S 34- 1~ 55 E ii53,01 S 35 23 32 E 1214,40 S :55 23:53 E 1275.98 1335.14 S 38 2 29 E 1400.52 S 38 lZ+63,27 S 39 24- 54 Fi 1527.01 1591.87 S 40 36 58 1657.49 1723e45 S 41 34 29 E 1789.53 S 4.1 58 4U 1855.87 S 42 21 15 E 1922~62 $ 42 40 17 E 1989.49 S 42 57 il E 2056.40 S 4.3 13 C E 2123,36 S 43 27 49 2190e35 S 43 41 43 E 2257.55 S 4.3 5/+ 41 E 2324e95 $ /+4 6 4.8 E 2392.65 S 44 16 4.1E 2460.4.5 S 44. 27 1 E 2527.51 S 4.4. 38 17 E 2993e76 $ 44 47 lB i 2659.53 S 44. 55 4.8 E 2725.11S 4.5 4. 36 E 2790.42 S 45 i2 14 E 2855,19 S 4.5 1~ 0 ~ 2919.63 S ~5 23 40 ~ DOG LEG SEVERITY DEGtlOOFT O ..:72 0,50Cr 0,253 C · 0 · 5C0 0 · 15 O 0 672 O, ~ 2 0 0,~67 0 · 0,28t O.()O0 0.~92 C'.565 OePOl O, Ci';U RCO DS 3-5 GYROSCOPIC SURVEY 22, 197;~ RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B H ELECTRONIC COMPUTER TRUE EAS. DRIFT VERTICAL EPTH ANGLE DEPTH D v 7500 40 15 6596,78 7600 41 0 6672,68 7700 41 0 6748,15 7800 41 45 6823.19 7900 42 0 6897,65 8000 41 50 6972.06 8100 42 30 7046.17 8200 42 15 7120,05 8300 42 15 7194,07 8400 41 30 7263,53 8500 41 5 7343.66 8600 40 30 7419.37 ~700 40 C 7495.69 8800 40 5 7572.24 8900 40 30 7648.51 9000 40 15 7724.70 9100 40 30 7800.88 9200 40 30 7876.92 9300 40 30 7952.96 9400 40 15 8029,14 9500 40 15 8105,47 9600 39 30 8182,21 9700 39 15 8259.51 9800 39 0 8337,09 9900 37 30 8415,62 LO000 36 30 8495,48 LOiOC 35 30 8576.38 LO200 34 45 B658.17 LO300 34 0 8740.70 SUB ~ DRIFT DIREC DEG, TOTAL COORDINATES 6546,78 $49.00E 2092.19 S 2127,79 E 6822.68 S49.84E 2134,54 S 2177.24 E 6698.15 S49.84E 2176.85 S 2227.38 E 6773.19 S50,OOE 2219,41 S 2277.95 E 6847,65 S50,84E 2261.94 S 2329,40 E 6922,06 551.005 2304,06 S 2361.26 E 6996.17 S50.84E 2346,~8 S 2433,37 E 7070.05 S50.84E 23~8.94 S 2485.63 E 7144.07 S50.84E 2431,40 S 2537.77 E 7218.53 550.54~ 2473.55 $ 2589.93 E 7293,66 549.84E 2515,~7 S 2640.33 ~ 7369.37 652,00E 2556,~5 $ 2691.04 E 7445.69 S51.OOE 2597.08 S 2741,~t E 7522.24 SSl.OCE 2637.57 S 2791.61 E 7598.51 SSl.OOE 2678.26 S 2841.87 E 7674.70 SSI.OOE 2719,03 S 2892,21 E 7750.8~ S52,00E 2759.36 $ 2942,91 f 7826.92 S52.00E 2799.34 S 2994.08 E 7902.96 S51.09E 2839,73 S 3044.94 E 7979.14 S51.09E 2880.42 S 3095.35 E 8055.47 S51,09E 2921.00 5 3145,63 E 8132,21 S52.00E 2960,87 $ 3195.83 E 8209,51 S49,09E 3001.18 S 3244.81 E 8287.09 S50.COE 3042.12 S 3292.82 E 8365.62 S47.09E 3083.10 S 3339.22 E 8445.48 S48.00E 3123,73 S 3383.62 E 8526.38 S48.00E 3163.06 S 3427.30 E 8608,17 S48,00E 3201.55 S 3470.05 E 5690,70 547,00E 3299,70 S 3511.68 E CLOSURES DISTANCE ANGLE D M DOG LEG SEVERITY DEG/iOOFT 2984,08 S 45 29 0 E 0.646 3049,04 S 45 34 2 E 0,8~3 3114e47 S 45 39 26 E O.oOC 3180.39 S 45 44 44 E 0,753 324~.92 S ~5 50 30 E 0.452 3313e47 S ~5 56 38 E 0,175 3380,36 $ 46 2 3~ E 0.064 3447.52 S 46 8 11 ~ 0,250 3514e54 S 46 13 34 E 3581.08 S 46 18 43 i 0,750 3646,91 S 46 23 3712.04 S 46 27 53 E 1,085 3776.41S 46 33 2 E 0.549 3840.55 S 46 37 30 E 3,U9~ 3905e04 S 46 41 51 ~ 0.4i0 3969.64 S 46 46 3 E 0'250 4034.20 S 46 50 37 E 0.490 4098e89 S 4~ 55 30 E O.OO0 4163e62 S 46 59 50 ~ 0,591 4228,24 S 47 3 35 E 0,250 4292.69 S 47 7 13 E 0.500 4356.62 S 47 11 7 E 4419.94 S 47 14 1 { i.191 4482.99 S 47 15 58 E 4544.88 S 47 17 4605.~6 S 47 17 13 E l.-bl 4663.83 S 47 17 45 E 1.~'2 4721.36 S ~7 18 16 E 0.756 4777.82 S ~7 18 25 C, iST ",~2- [CO DS 3-5 GYROSCOPIC SU,qVEY JUNF 22, 197~! RECORD OF SURVEY ALL CALCULATIONS PERFORF, ED BY I B M ELECTRONIC COMPUTER TRUE ~AS, DRIFT VERTICAL SUB DRIFT ~PTH ANGLE DEPTH SEA DIREC D ~ DEG. TOTAL COORDINATES )400 33 15 8823.c)'7 8773,97 S47,00E )500 32 30 8907,96 8857.96 S47,09E )580 32 0 8975,62 8925~62 $48.00E 3277.46 S 3552.18 E 3314,45 S 3591.91 E 3343.27 S 3623.40 E ~(TRAPOLAT 3868 31 1 .3950 30 3 3TTOH HOL ION TO TOTAL DEPTH BY kiSS DATA 5 9220,84 9170,8~+ S40,OOE 3451,~1 S 0 9291.22 9241.22 S38.00E 3484.~1 S E CLOSURE 5122.46 FEET AT S 4~ 8 !4 g 3728.22 E 3754.70 E CLOSURES D I STANCE ANGLE D H 4833,19 S 47 18 lg E 4887,47 S 47 18 2 E 49B0,16 S 47 18 9 E 5080,51 S 47 12 16 E 5122,46 S 47 8 14 E DOG LEG SEVER I TY DEG/iOOFT ~.750 0.750 0,702 0.792 1.112 E: i S T ;'~, !'x 2 ... 45L~2.1 493u · 14 RCO DS 3-5 GYROSCOPIC SURVEY EASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. JUNE 22, 1978 TRUE 5~,EASUR ED VERTICAL SUB MD-TVD VERTICAL DEPTH DEPTH SgA DIFFERENCE CORRECTION TOTAL COORDINATES 150 150, 100 0 O 250 250. 200 0 0 350 350. 300 0 0 450 450. 400 0 0 550 550, 500 0 0 650 650, 600 0 0 750 750, 700 0 0 850 850, 800 0 0 950 950. 900 0 O 1050 1050, 1000 0 0 1150 1150. 1100 0 0 1250 1250, 1200 0 0 1350 1350. 1300 0 0 1450 1450, 1AO0 0 0 1550 1550, 1500 0 0 1650 1650~ 1600 0 0 1750 1750, 1700 0 0 lSSO 18500 1800 0 0 1950 19500 1900 0 0 2050 2050. 2000 0 0 2150 2150. 2100 0 0 2250 22500 2200 0 0 2350 2350. 2300 0 0 2450 2450. 2~00 0 0 2550 2550, 2500 0 0 2650 2650. 2600 0 0 2750 2750. 2700 0 0 2850 2850. 2800 0 0 2950 29500 2900 0 0 3051 3050, 3000 1 1 3153 3150, 3100 2 1 3255 3250. 3200 4 2 3357 3350. 3300 7 S 3460 3~50. 3400 10 3 3565 35500 3500 14 ~ ~65,13 S 465,36 S 465.71 S 466.18 S 466.77 S 467,47 $ 468,29 S 489.23 S ~70,28 S 471.45 S 472.69 S 473,91 S 475.03 S 476.00 S 476.77 S 477,29 S 477,54 S 477,56 S 477.77 S 478,21 S 478.83 S 479,&0 S 480.45 S 481032 S 482014 S 482084 S 483037 S 48~092 S 485,38 S 488.97 S 496075 S 507,25 S 519.86 S 534.83 S 553.6~ ~ 100,05 E 100,14 E 100,28 E !00,47 E 100,71 E 100,99 E 101.33 E 101.70 E 102,13 E 102,60 E 102.89 E 102.87 E 102.57 E 102,01 E 101,25 E 100,34 E 99e36 E 98.39 E 97e54 E 96,79 E 96e18 E 95078 E 95e60 E 95067 E 95,97 E 96e49 E 97.19 E 99.24 E 105,57 E 118.32 f 134.21 E 150,46 E 168.12 E 189.00 E 213.10 E ~CO DS 3-5 F. ASURED DP:PTH AND OTHER GYROSCOPIC SURVEY DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, JUNE 22~ 1978 TRUE MEASURED VERTICAL DEPTH DEPTH SUB MD-TVD VERTICAL SEA DIFFERENCE CORRECTION TOTAL COORDINATES 3671 3650, 3780 3750, 3891 3850, 4005 3950, 4122 4050, 4243 4150. 4369 4250. 4497 4350. 4628 4450. 4759 4550, 4890 4650. 5021 4750. 5152 4850. 5284 4950. 5419 5050. 5554 5150, 5689 5250, 5824 5350, 5960 5450. 6096 5550, 6231 5650. 6367 5750' 6503 5850, 664C 5950, 6776 6050, 6910 6150, 7043 6250. 7176 6350. 7309 6450. 7439 6550e 7570 6650, 7702 6750, 7836 6850, 7970 6950, ~105 7050, 3600 21 3700 29 380O 4O 3900 55 4000 72 4100 93 4200 118 4300 146 4400 177 4500 209 4600 240 4700 271 4800 302 4900 334 5000 369 5100 404 5200 439 5300 474 540O 510 5500 546 5600 581 5700 617 5800 653 5900 690 6G00 726 6100 760 6200 793 6300 826 6400 858 6500 889 6600 919 6700 952 6800 985 6900 1020 7000 10~ 7 8 11 15 17 21 25 28 31 32 31 31 31 35 35 35 35 36 36 35 36 36 37 36 34 33 33 32 31 3O 33 33 35 577,15 5 606,64 S 639,89 S 678,55 S 721,50 S 768,94 S 819.41 S 865e54 S 912.96 $ 962e09 S 1011,64 S 1062,02 1112,10 S 1162,91 S 1215,83 S !.270,32 1326,13 S 1381.68 S 1439.12 1496.80 S 1554.33 S 1612.41 1670,54 S 1730,60 S 1788.36 1845.07 S 1900.70 S 1956.03 S 2011,52 S 2066,36 S 2122.02 S 2177.71S 2234,83 S 2291,79 $ 23~8,55 $ 240,49 E 270,49 E 306,34 E 345,72 E 388,70 E 437,54 E 493,97 E 559.46 E 629,26 E 699,08 E 767,44 E 835,45 E 903,79 E 973,72 ~ 1046,52 E 1119,19 E 1190.84 E 1262.92 E 1334.64 E 1405.87 E 1476,92 E 1548,21 E 1~19,91 E 1691,05 E 1763.37 E 1832.36 E 1900,31 E 1968.11 E 2033,27 E 2097,76 i 2162.11 E 2228.37 E 2296,33 E 2365,42 E 2435.96 E RCO DS EASU° 3-5 iDEPTH AND ,,OTHER DATA FOR GYROSCOPIC SU2VEY EVLRY EVEN 100 FEET OF SUB SEA DEPTH. JUF~E 22, 1972 MEASURED DEPTH TRUE VERTICAL SUB MD-TVD OalJTH SEA DIFFERENCE VERTICAL CORRECTIO~ TOTAL COORDINATE3 8240 8375 8508 8640 8771 8902 9033 9164 9296 9427 9558 9688 9816 9943 0067 0190 031 1 0431 c)55 0 066 8 0785 O902 7150, 7100 1090 7250, 7200 1125 7350, 7300 1158 7450. 7400 1190 7550. 7500 1220 7650. 7600 1252 7750. 7700 1283 7850, 7800 1314 7950. 7900 1346 8050. 8000 1377 8150. 8100 1408 8250, 8200 1438 8350. 8300 1466 8450. 8400 1493 8550. 8500 1517 8650. 8600 1540 8750. 8700 156~ 8850, 8800 1581 8950, 8900 1600 9050. 9000 1618 9150, 9100 1635 9250. 9200 1652 35 32 32 31 31 32 31 31 27 23 21 17 17 2406.23 2463.64 2519,11 2572,89 2625.78 2679.06 2732.41 2784.95 2838.14 2891.40 2944,33 2996.13 3048,61 3100,80 ~150.18 3197,7~ 3243.89 3289.05 3332.50 3374.95 3~19.28 3465.36 2506,24 E 2576.19 E 2644.30 E 2711.42 E 2777.06 E 2842,85 E 2908,845 2975.66 E 3042,89 E 3108.91 E 3174.74 E 3238.89 E 3300.49 E 3358.33 E 3413,00 E 3465.82 E 3516.18 E 3564.60 E 3611.47 E 3657.12 E 3699.83 E 3739.42 E ;~CO DS 3-5 GYROSCOPIC ,SURVEY dUNE 22, 197U [ERPOLATED VALUES FOR EVEN TRUE ?,IEASURED VERTICAL DEPTH DEPTH 1000 999. 2000 1999. 3000 2999. 4000 3945. 5000 4733. 6000 5479. 7000 6217. ~000 6972. 90('}0 7724. I i; ,'n(',~' 84o= 1000 FEET SUB SEA 949. 2949. 6167, 6922. 7674. 8445. OF !,~EASURED DEPTH. TOTAL COORDINATES 470.85 S 102.36 E 477.96 S 97.15 E 486.75 S 111.21 E 676.78 S 343095 E 053.87 S 824.60 E 456.12 S 1355.64 E 882.86 S 1B78.28 E 304.43 S 2380.95 E 719.03 S 2892.21 E 123.76 S 3383.59 E HORIZONTAL VIEW ATLANTIC RICHFIELD DRILL SITE 3-5 RADIUS OF CURVATURE GYROSCOPIC SURVEY SCALE I'= I000' COMPANY 6000 68OO 7~00 7600 IALL DEPTHS SHOWNI ARE TVD I000 8400 8800 9P..OO TVD = 9291' TMD = 10,950' VERTICAL SECTION ATLANTIC RICHFIELD COMPANY DRILL SITE :5-5 RADIUS OF CURVATURE GYROSCOPIC SURVEY SCALE i" = I000' 5200 ~0~6000 '~ 6400 ~TEO0 ~ 8000 TVD = 9291' TMD = 10~950' DON BAKER, INC. DIRECTIONAL AND DRILLING CONSULTANTS REPORT AND PLAN OF' SUB-SURFACE SURVEY FOR COMPANY: ATLANTIC RICHFIELD CO. WELL NO. :DRILL SITE NO. ~ 3-5 DATE:8/6/76 LOCATION: PRuu~OE BAY _~MEASURED DEP_IZt_A. NID_O.THER._DATA. FOR EVERY_.._EVEN. 100 -F-EET--OE-$UB-$EA .DEPTH -.. TROIS MEA__~R_E_D VERT ! CA[.-/SuB'_~ .... MD-T'~D .... VERiT_ICAL DEPTH DEPTH SEA _ D I.F_F..ER ENCE__ COR R E~C_T. [Q~;. .. T O_T_. A L__C.. 0 C)_R D_iN A .T_E.S --. 261 261, 200 O' 361 361, 300 0 461 461, 400 0 561 561, 500 0 661 661. 600 0 __ 761 751, 700 0 g61 861, 800 0 961. 961, 900 0 1061 ....... i061, 1000 '0 116-i 1161; -1100 0 1261 1261, 1200 0 1361 1361, 1300 0 1461 1461, 1400 0 1561 1561. 1500 0 1661 1661, 1600 0 1761 1761, 1700 1861 1861, 1.800 1961 1961. 1900 2061 2061. 2000 2161 2161, _ 2100 2251 2261,_ 2200 2361 2361, 2300 2461 ....... 2461, ..... 2400 2561 25.61, .... 2500 2661 2661e ...... 2600 ......... 2761 2761. 2700 2861 2861, 2800 2961 3062 3164 3265 3368 3471 -. 3~76 2961. 2900 3061, 3000 -_ · 3161, .... 3100__. 3261, 3200 3361, 3300 3461, 3400 3561, 3500 0 0 0 0 ~+65,15_$ · .100,06 465,39 .S .... 100,16 465.76_S 100.30 466~. Z_4 S_ 100.50 466,8~ _ .$_" 100,74 467,55__5 ..... 101,03 ~6B, 39_.$ ..... 101 e37 ~69,3~_5_~_101,75 4?0,40 5__102,18 471,59 472,83 5__102,90 474,04 5 .102,85 476.,10 5 __101,94 476,84 ~ 101,16 477,33 5 E E E E E E E E- 0 1 15 1 1 48~*_36._S ....... 98,66 ..486,03_$ 104,82 489,52 S 116,52 496,22__5_... 1.31.94 506,80 S 148,29 519,77 $ 166,77 535,22 $ _187... 76 _.5._5_~, 5. 2 S 212.52 0 477,55 S .... 99,25 E ...... 0 (-I..7.._7,57 S _.98,29 E O__ 477:_81 S ._97,4~5 E 0 478,27 S .... 96,71 E 0 4 78,91__S: ..... 96.13 E 0 479_.,69 $__ 95,75__. E ....... O ....................... ~80.55__% ....... 95,60 0 ................. 481,~1.__$ ....... 95,69 0 ~.82.,.22_~ m .96,02 ...... 0 482,9Q.~ 96,56 ................ 0 483,43__.$ ........97.25 E E E E MEASURED DEPTH AND o_:rHER_.DATA"~OR _EVERY _EVEN_. 100 FEET OF 5W.B__SEA.._DEPTH. TRuE --MEASURED VE.~T Z CAt.~' -SUB .....MD"~D ............. ~ERT ICAL DEPTH _DE~.._H_~'SEA D IF. FE_REN_C~ ...... ~3RRE¢~ION ..... T..O_T_AL _._.~'~-_RD I~_T.-E5 3791 3761, 3700 30 9 605,89 5 273,35 39~'~ 3861, ...... 3800 42 ................. i.2. 637,75 '5 ............ 310,01 4017 3961' ......... 3900 .......... ~5 ............ 13 673,59 5~- .... 351,23 .. 4134 4051, ........ 4000 ...... 73 ........ 18 715,09~.~__i .... 397,35 42.~7 4161, ...... 4100 95 ....... 22 76~,39 5 ~8,37 4383 4261, .......~200..~_..i22 27 45.12 4361, ........ 4300 . .....151 ........................ 29. 6~5,~2._5 ....... 570,47 46.43 4451, ~400 .......!82 31 __911,78.5 .......... 641,34 4775 4.551~ 4500 ....... 2.~ 32 955~!~ 5 714,35 .... E ~9.06 ~66~, ......... ~600 ......245 31 1000~98___5 ........... 787o00_.E .... 503.8 ~761, ......... ~700 ......277 ...................... ~2 ~.0~6,~9..._5 ......... 859,65 E 5169 ~61,__.4800 ........ 308__ 31 .1092,55 5 931,19 E 530~ 4961, .......4900 ..340 ................ 3~ 1140,61..5 .... 1003,58 E 5435 5061, 5000 · 373 33 1190,15 $ 1075,86 E 5568 5161, .5100 ~07 34 1~4!,.19__$ ....... 1148,01 E 5703 5261, 5200 . _.__442 35 ' 1294,2!_$ ..... 1221,16 E 5838 5361, .......5300 ......476 ....... ~ 13479.~._.$ ........1294,50 5973 5461,__5a00 ..... 5!2 36 1400,93 S 1368,05 6109 5561, 5500 548 36 .1455,00 $' 1442,04 -6244 5661, 5600 ........ 5S3 ........................ ~5 1510,29_$ ..... 1514,11 6378 5761, _~5.700 ...... ~17 34 1566,65 $ 1584,12 6514 5861, 5800 652 35 1624,~28 S _1655,29 E 6785 60~1, 5000 6918 6161, 6100 757 7051 6261, ..... 6200 ...... 79.0 7183 6361, 6300 922 7313 6461", -~400 852 7444 6561, 6500 883 7576 6661, 6600 915 7708 67~1, ~700 947 7841 ........... 6861, ---~00 980 7975 69~-1' 6~00 .... 1~0-i3 8~09 7061, 7000' '~0~8 35 1!39,34 ~___1797,37 ..... ..33 .... 1849,55_.S ........ 1933,70 E 32 ~903,00 5 2000,67 E .. 30 1955,21 5 ..... 2066,87 E ..... ........... 31 _2.007,~2_15 ....... 2133,45 E 32 .2060,~.1__5 ..... 2200,2~ ....... 32 211~,55 5 22~7,50 E ..... 33 2~.69.,84 S 2335,34 E - 3.3 22~,56 5 ~04,01 .... E 35 ' ~283~5 $ 2~72,52 .E "7~-EASURED DEPTH AND OTHE_R .... DA.T_A__.~OR..EVERY _E~/_.EN__.iO0 __F_EE_I_OF_ SUB__SEA_DEPTH. ............ T~uE" ...... MEASURED VE.~T I CAL--suB -- ~D--T~jD __VERTICAL --' ~EPTH DEPT,~ ....... SE.A DI.F_~..E_~.E:N_C__E CORRECTIO_N . . 82/,3 8375 _ 8508 8639 8769 ._ 8900 9030 9159 9289 95A7 9675 9802 9928 10052 7161, 7100 1082 .3~ 7261, 7200 1114 32 7361e 7300 1147 33 -7461, 7400 1178 31 7561, 7500 1208 30 7661, 7600 !239 31 7761e 7700 !269 __30 7e61e 7800 1298 .......................... 29 7961, 7900 ~328 .................. 30. 8061, 8000 1357 29 '8161, 8100 1386 29 8261, 8200 I~1.~ ..................... 28 8361, 8300 8461. 8400 1467 .................. 26 .... 8561, 8500 1~91 ...................... 2 2397.30 S .... 2607.72 ~ 2452,77__.S __ 2673,83 E 250_7,43 $ .__2738,97_.F 2561,46..S_ 2803,19 F .._2615,6Z._S: 2866,67 E 2669,98 S ..... 2929,42 E 2724,54 S ...... 2991,42 ~_ 27%9,2.8 S ...... 3052,70.E__ 28.3~,2_0_~ 3113,24_F __2889,~1S .... ~173,05 E ' __29~4,27__.S. 3231,87 E 2998,.0.%~.S 3288,77_E_. _.B050,67._S ...... 3343,71.E 3102,0%_._S ........ 3396,75_E 10175 10297 10417 10537 10656 1077~ 10890 8661, 8600 1514 23 8761, 8700 1536 ...... 22 8861e .8800 '1556 .... 20 8961. 8900 1576 20 9061, 9000._1595 19 9161. 9100 1612 __ 17__ 926~.._ 92oo.._~.~., 17 315.2.,29.._S___~447,9~ E .... 3201,36 S .... B~97,29.E .... 3249,27_~.$ ........ 3544,87 E .... 32.~6.,0~_$_ _3590,71 E 33~1,6~_~ ..... 3634,83..E__ 3386,90_.5 ...... 3677_,1.1 ~ ..... 34333Q.6_S .__I_NTER°OLAT_ED VAL_~_E5 F~O~-'~E~-E~'Io00 FEET OF ~EASU_RED DEPTH· MEASURED DEPTH __.. TRUE VERTICAF. .... SUB DEPTH_.]_.. S E A..'_~'] -_~ .-_T--_O-TiAC ]'] --__~ 06-R-D I-N-A-_T]E-~- 1_000 2000 3_0_0_0 4_0.00 5000 6000 7000 .... %O00. 9_0._0_0 iO_O_QO 999, _ 938 _1999, ...... 1938 __.2999, .......2938 39~6· .... 3885 ~732· 5480, 54 6222· 61 6980, .... 69 7738, .__'76 8519· 71 19 61 19 77, .... 265!·58._5___ 58, ............. 3080·55 5 , ......... 470,85.5 102,36.E_ · ............... 477,96_5 ........ 9_7.,15.F · ............. ~8.7.,15 .... 5 ......108,.7.8._E · ................. 668,.15._5 .344,97.._E · ........... 1033 · 30 .. S ........ 838 , 79_..E_. · 1'411,64 5 1382,79 E . ............ ~ ~ z ~ .~z i'i'~2'i~7'~ ~'° 7., 8 o__~ ............ 7. ................ '.' __. , ........... 2237.21 .... 5 ........ 241~_,.82_E ................................. .Z9.!5..,i?_._E_ ....... ....... 3373~_~3.__E_ INTERPOLATED TRUE VER.~.I.CAL DEPTHS,__ COORD ! NATES .AND___CLO$_U_RES . EQR_G I VEN DEPTHS TRUE · _ . C L 0 S U R E ,SUB DISTANCE __ANGLE SE_A CODE ..........__~_E AS. UR E D VERTICAL ......... TOTAL NAME DEPTH DEPTH __10292 ........... 8757.02.._ 3199.27.__S ...... 3~95.04 E ............4738.22 10493 8924,03 3278.77 S 3573.72 E 4849.93 ~0775 9~62,~9 3387',68 S ~677,82. E 5000o27 .............. ..~D8_59 .... 9234.06 3~20,73 S 3706,58 E 5043,83 S 47 lB1 47 E .... 8696,02 $ 4._7.._27 52 E ___8863,03 s _~_7__Z.6 5 6 E ___8.~_OO. 7 6 ___ S .~7_21 5 E .910]._.39 _5 ~7_]._3 ~ 8 ._E .. _..92.53,. 13 ¢0,~4 PLE T ! O._N_. R E._P_O RT_ .................................. AUGUS_T___iO ,__ 1976 AT.T_.LAN_T_IC RICH_FI_ELD COMPANY .................... WELL NO,___DS_-_3-_5 ~AGNETIc SINGLE-SHOT SURVEY ....... K_,. _B._, ..... E__LE_V...,__6_I~_0 FT.,. ........................ -- RADIUS OF CURVATURE METHOD OF CALCULATION _ _.. COMPUTED FOR .D_O_N._BAKE_R__IN_C, BY F, .. H, .... L IND_5~_Y_AND_A55.Q_.Q !__A_T__ES ................................ ~'R-EC- 0 P._D_O.F_ S u R VE Y ..... ALL CALCU_L~YI'ON'~ PERFORMED BY ! B.~,I_.ELEC_TR_O_N..IC.__C__OMpUTER ,YEAS, D O. EP_T H _A RIFT NGLE D M TRUE DOG_LEG VERTICA'[ ..........5U'B ......~'iFT TOTAl ~608D_!~&_!E$ ..... C_L..O_5_H_R.i~_5 .... "~SEVERITY ...... ..... ~EPTH ....... SEA DIREC ........................................ DISTANCE ........ ANGLE DEG/iOOFT ....... DISTA~ ........ DEG. D M S .. 183 273 280 2 87 0 b __.0 0-;0-0.'~ ........ -6i-,'00 ~'~."00E ~65.00 $ 100.00 E ~75.63 S i2 8 i2 ~._O.O00 .... ~'89.2 6 0 ~5 1035,97 ................ 978,97 S22,00E ~71,28 _S ..... ~9.2,_5~._~__ ~82,31.__~_ 12_. 16 29 E 0,072 395,3 2 0 39. 1~.~..!.9..2 ...... !770,92 .... 58~.~QW ..~.~.!,.55 5 98,54 E 487,6.1_5_11 39 .... 35__E.: 0~.0_31 .... 3.96,6 ~ 0 30 .... 2733,88 2672,88 558,COE ....... 483,29 _$ .......97,06 E ......... 492,94._...S 11 21 20 E .... 0,106 399,4 ....... 0 0 ~0 2799,88 27~8,88 $46,00E ~83,65 S 97,5'1 E 493,38 S 11 23 57 E 0,~58 400.~ ...................................................................... 8 2 3. Q.__.~877,85 2816,85 577,0'~E ...... 488,61 5__99,28 E' 49~,68 ......... 5 11 3~ ~2 E 2,565 6 65-. .299'9,82 293~,42-' 573,00E ~87,15 5 .... 108,78 E ...... ~99,~5._5 ~2 35 16 E .... 3,48~ . __ ~0,7 8__15___ 3060,89_ ._2999.89 573,00E ........ 489,52_5 ...... ~6,52 E 503,20_$ 13 23 2~ E ..... 2,4~9 ........ 417,9 0 0 3122,11 .... 3061,11 565..9.0~ _~93,04__..$__ 125~69 E 508,8!_$_!.~_~8 ..... 7_ E ........Z, 8~49 ~27,1 1 .... ~ ..... 3210,60 3149,60 556,00E ....... 501,11_.5 ....... 139,95__E ...... 520,29_._$__.15 36 ~6 E ........~,169 .......... 4~3,0 ~ ....0 ....3391,19 _3330,19 55~,QOE ....... 92~,07 5 ~72,75 E 551,81 _5.. ~8 14 37_E_ . 1,623 ...... ~82,7 2 30 3687,23._3626,23 5~9,.~0~ ~84,82 S--- 249,12 E__ 635,6~_5 23_? 22 E .... 2,~3~ __.580,0 0 ~.~__3966,54 3905,54 ..... ~75,68 .S .... ~53,6~_E ......... ~62,64_$ 27 37 37 E _. . 2,~8~ ............ 7~8,4 6 ~5 ~1~9.06 .... ~088,06 758,06 5 .... ~41,98__E ....... ~77.50 5._30 ~ 38 E 3,039 839,2 3000 3062 312~ 1 32~ 1 3399 1 3711 2 a023 3 $49,00E 545,OOE -- 477~ 5146 5613 60a~ __ 6306 6626 6952 7~55 0 30 ~397, 0 30 4560~ 0 30 ~8~3, 2 0 5194, 2 30 5516, 2 0 5707. i 0 6186, 8660 ~2 0 702~, . 8693 40 0 7502, ~5 4336,4_5 ..... $57,00E 882,73 5__595,9~ E 10.~,06__5_3.4_._1_2~ E ..... _1,981.. _1036,9 18 ..... ~49~,18 ...... 559,.ODE .... 956,38..S ......... 713_,79 .... E .... 1193,38 .... S. 36._~4 9 E ...... '0,~07 1173,4 05 4782,05_ $57~_00E._- 1084~40.__5 918,67 E 1421,22 S 40 16 12 E ........ 0e349 ...... 1~10,7 15 5i33_,15 ..... SS~..~pOE__!.Z58_~_ZS._S _1~72.~.39.,_E. 1720,18_5_42 57 5~ 'E ..... 0,431 1715,4 1~__.5~55.,.14 ......... 55~,~0E ...... 1~30,69 5 __1409,01.._E .... 2008,03.._$ 44 33 45 E ..... 0,115 ....... 2005,8 12_56~'5,12 .... 551~90E ~536,28__5 1586,62__E ....... 2179,95._5 45. 11 31E __0,556 ...... 2178,5 ~2 _._5882,52._.551,00E__1672,01_5 ...... kT14,a3_.~ 23.!A,62_.5..45 _~2__51 a____O_,Z3~ ...... 2393,7 25 _6125,25 ....... SSI:_O.OE 1808,95 S _1883,33 E--. .... 261!,37_5 ~6 9 __14 E ...... 0.,537 .......... 2610,9 69 .... 6~3. i,6.9 $_5._2_..POE..._i.97_i.81__s ....20_88.i~_E ..... 28.7._2.05 $_._~,6 .38 26 E ...... 0,268 ...... 287i.9 7.3_ .... 696~,73 550,00E 2262,92_5... 24~7,57~3_3.3.3_,3.8_5.._~7___i4_41_E__D,31k_ ..... 3333,3 ~'___~..~_1:_4_'~___55_0..~_0_0_E____2529,8~ S ..... 2_7_6_5_,_68__.E. .37~.8,21_.5_~7 32 .59 E_. 0,31~ .......... 37~8ol ALL R E C6-R6" '6F ._5 U__R V_ E Y CALCULATi ONS-.i~'~ ER_'~b_R.M. ED .BY__I_.__B. H.E._L_ECTRON ! C CO_,~_P_P.U?E,_R__ TR~E ........................................... _!~EAS. DRIFT VERTICAL .... SUB . DRIFT ...... TOTAL~OORD_I~!E$_' DEPTH ANGLE DEPTH SEA DIREC D H DEG, ............. DOG_LEG ............. C L O S U R EmS SEVER ! T--Y .......... 'SEC T ! O DISTANCE ........ ANGLE DEG/iOOET ...... DISTAN · ~ _~ _D____IVL__$ ......... . 10672 10868 31 15 9241.75 10950 30 30 9312.13 ~319.1 50~8.4 5090,1 BOTTOM HOLE CLOSU_RE ..... 5'O'96"l-.O'.-.~E.ET__AT_.._S..._~7_.i3 ..1.8 E HORIZONTAL VIEW SCALE I"=§00' ATLANTIC RICHFIELD COMPANY. DRILL SITE 3-5 RADIUS OF CURVATURE MAGNETIC SINGLE-SHOT I ALL DEPTHS SHOWN 1 " lANE TVD . 56o( 600o 80oo 8400 TVD = 9~3 TMD ~10~950' VERTICAL SECTION SCALE I"=1000' ATLANTIC RICHFIELD COMPANY, DRILL SITE 3-5 RADIUS OF CURVATURE MAGNETIC SINGLE -SHOT ALL DEPTHS SHOWN ARI[ TVD TVD= 9~312' TMD = 10,950' · i CO:v~PLET IO,N ATLA;",~TIC RICHFI;7. LD ,,~O,V, PA;',~Y GYROSCOPIC SURVEYv' -' RAgIUS OF CURVATUR'--- '.iETFOD OF CALCULATION ~ CO";PUT~D,., _ FOR SDC 9Y F,!.i, LINDSEY AND ASSOCIATES RECORD OF A! ,-,~.L CALCULATIO~\S PERFOR~,*,~D BY SURVEY ~. ,,4 ELECTRONIC CO~viPUTER TRU= ,YEAS. DRIFT VERTICAL SU'3 DEPTH ANGLE DEPT,~ SEA D O 0 O 0.00 -90.00 1036 0 45 1039.97 985.97 &832 0 30 1831,92 178t,92 2734 0 30 2733.88 2683,88 DATA ABOVE TH IS PO I;tT FRCM MSS 2800 ! 0 2799,88 2900 3 30 2899,79 ~000 7 ~5 2999,29 ~100 10 15 3098,05 ZOO 10 50 3196,36 3300 12 0 3294,38 3400 !4 15 339!,76 3500 16 30 3488,17 3600 19 30 3583.27 3700 22 0 3676.78 3800 25 0 3768.47 3900 28 0 3557.95 4000 30 0 3945,4! 4100 32 0 4031,12 4200 34 45 411g,62 4300 37 15 4195,52 4400 38 0 4274,72 4500 40 0 4352.43 2749,88 2849~79 2949.29 3048,05 3145,36 3244,38 3341.76 3438.17 .,':533,27 3626.78 3718,47 3807,95 3895.41 3981.12 4064,62 4145,52 4224.72 4302.43 DRIFT DIREC DEG, S22.OOE 522,00E S87.00W S58,00E RECORDS 578,00E S77.00E S76,00E S63.00E S57.OOE SS~,OOE S55,00E S52,00E SS!,OOE S44,00E S48,00E $46,00E S45.00E 545.005 S45,00E 547.OOE S54,00E S57,00E TOTAL COORDINATES CLOSURES DISTANCE ANGLE D H 465.00 5 4~1 ,i28 5 477,~5 $ 483 ,'29 $ 4 8 3 · 6'Z 48~+. ~+7 S 486.75 492.22 501.37 512,58 525,76 541,53 550,77 584,68 612,38 642 , 80 676,78 713,20 751.7~ 792.21 83!,0i 866.65 i00, O0 E 102,54 F 98,54 E 97,05 E DOG LEG SEVERITY DEG/IOOFT 475.63 S 12 S 12 E 0.000 482.31S 12 16 29 E 0.072 487.61S 11 39 35 E 0.031 492.94 S I1 21 20 E 0.106 S 11 26 20 E 0.758 S !1 51 15 E 2.500 S 12 52 14 E 4.250 S la 20 27 E 2.534 S 15 46 46 E 0.627 S 17 7 52 E !,167 S 18 33 18 E 2.251 S 20 3 51 E 2.263 S 21 35 43 E 3,002 S 22 59 26 E 2,686 S 24 19 9 E 3,084 S 25 42 4 E 3.032 S 25 56 25 E 2,016 S 28 4 20 E 2.000 S 29 I0 7 E 2.769 S ~0 15 45 E 2,527 S 3! 30 11 E 2.757 S 32 55 24 E 2.353 111.21 E 499,30 125,83 E 508,05 141.68 E 521.00 157,99 E 535.38 !76,48 E 554,59 197.79 E 576.52 221,97 E 603.10 248,07 E 635,14 276,74 E 672,01 309.37 E 7!3,38 343,95 E 759,i7 380,37 E 808,29 419.60 E 860.93 462,23 E 917,20 509.31 E 974.67 561.16 E 1032,47 SECT IO~ DISTAN, 3S9.6 395.7 397.0 ~99,9 400,7 404,0 412.6 427,0 444,9 487.2 5!3,2 544 , ] 579.~ 619,~ 664,C 712,Z 753,~ alS.~ 877,' iO00.i RCO DS 3-5 GYROSCOPIC SURVEY JUNE 22, 1978 o, RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I 'B M ELECTRONIC COMPUTER EAS, DRIFT ,EPTH ANGLE D ,v., 46u0 40 15 4700 40 45 4800 40 0 4900 40 15 5OD0 4O 15 5100 4O 15 5200 40 45 5500 41 30 5400 42 15 5500 42 i5 5600 42 !5 5700 42 15 5600 42 30 5900 42 30 6000 42 30 ~O' 42 30 6300 42 30 6400 ~2 45 6500 42 45 5600 43 0 6700 43 0 6800 42 0 6900 4! 30 7000 41 !5 7100 41%5 72O0 40 45 7300 40 15 7400 40 15 TRUE VERTICAL SUB DRIFT DEPTH SEA DIREC DEG. &.4~.8.'° 904378.90 S55,00E 4504.94 4a54,94 S55,00E 4581.12 4531.12 S54.00E 4657,58 4607,58 554,00E 4733.91 4683,91 S53,OOE 4810.23 4760,23 S54,00E 4886.27 4836,27 S54,00E 4961.60 4911.60 S54.00E 5036,06 4986,06 S54,00E 51!0.08 5060,08 553,005 5184,10 5134,10 S52,00E 5258,!2 5208,!2 S52,84E 5332,00 5282,00 551,84E 5405,72 5355,72 SSl,OOE 5479,45 5429.45~ SSl.OOE 5553,18 5503.18 SSI.OOE 5626.91 5576.91 SSl,OOE 5700,64 5650,64 SSI,OOE 5774.22 5724,22 S50.84E 5847,65 5797.65 550,845 · 5920,93 5870,93 S49,00E 5994,07 5944.07 S52,00E 6067,79 6017,79 SEI,OOE 6142,40 6092,40 550.005 5217,~4 6167,44 SSI,OOE 6292.62 6242,62 SSl,OOE 6368,09 6318,09 SSO,OOE 6444,13 6394,13 S49,00E 6520,46 6470,46 S50,00~ TOTAL COORDINATES C L 0 S U DISTANCE 902.69 S · 614,59 939.94 S ' 667,79 977,55 S 720,52 1015,44 S 772,66 1053.:,!~87.~ S 824.60 1092 . 0 5 876,54 1 !30,'~8 S 929,08 1169,~13 S 982,29 1092,05 S 1153,01 S 1214,40 S 1275,98 S 1.338,14 S 1400.52 S 1463,27 S 1527.01 S 1413,61 S 1303,13 E 1922,62 1456,12 S 1355,64 E 1989,49 1498,64 S 1408,14 E 2056,40 1541,15 S 1460,64 E 2!23,36 1583,67 $ 1513,15 E 2190,35 1626,~6 S 1565.72 E 2257.55 1669,23 S 1618,35 E 2324,95 1713,03 S 1670,41 E 2392,65 1756,41 S 1723,05 E 2460,45 1798,46 S 1775.90 E 2527.51 1840,82 S 1827,28 E 2593.76 1882,86 S 1878,28 E 2659,53 1924,36 S 1929,52 E 2725,11 !966,09 S 1980,14 E 2790,42 2008~26 S 2029.5~ E 2855,19 2050.2~ S 2078,66 E 2919,63 RES ANGLE O M S 34 35 36 37 38 38 39 40 40 41 41 41 42 42 42 43 43 43 43 44 44 44 44 44 44 45 45 45 45 14 55 E 23 32 E 23 33 E 16 5 E 2295 44 45 E 24 54 E 2 11 E 36 58 E 8 4 E 34 29 E 58 48 E 21 15 E 40 17 E 57 il E 13 0 E 27 49 E 41 43 E 5441 15 6 48 E 1641 ~ ~7 1 ~ 38 17 E 47 18 E 55 48 E 4 36 E 12 14 E 18 6 E 23 40. E DOG LEG SEVERITY DEG/iOOFT 0.872 0.500 0,856 0,250 0.546 0,646 0.500 0.750 0.750 0,672 0,672 0,565 0.520 0,567 '0,000 0,000 0.000 0.000 0,261 0.000 0,892 2,046 1,096 0,665 0.501 0,000 0,657 0,651 ' ' 0.646 SECT IO~q DISTANCE i064.54 1128'87 1193,12 1257,10 i321.31 1385.53 1450.01 1515.30 1581.5~ !648.40 1715,34 1782.29 1849,41 1916.78 1984,18 2051,59 2119,00 2186.40 2253.97 2321,71 2389,67 2457.74 2525,!0 2591,58 2657,56 2723.35 2788,84 28D3,7~ 2918,28 ARCO DS 3-5 . GYROSCOPIC SURVEY JUN E 22, 1978 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER MEAS, DRIFT DEPTH ANGLE D ~ "00 4O 15 ,o00 41 0 7700 41 0 7800 41 45 7900 42 0 80O0 4i 5O 8100 42 30 . 8200 ~2 15 8300 42 15 8400 41 30 85OO 41 5 860O 40 30 8700 40 0 8800 40 5 8900 40 30 ~9000 40 15 o'00 40 30 3o 9300 40 30 9400 40 !5 9500 40 15 9600 39 30 9700 39 !5 9800 39 0 9900 37 30 10000 36 3O 1O1OO 35 3O 10200 34 45 10300 34 0 TRUE VERTICAL SUB DE°TH SEA 6596,78 6546,78 6672,68 6622,68. 6748,15 6598,15 6823.i9 6773.19 6897,65 6847,65 6972.06 6922.06 7046.17 6996,%7 7120.05 7070.05 7194.07 7144.07 7263.53 7218,53 7343.66 7293.66 7419,37 7369,37 7495.69 7445.69 7572,24 7522.24 7648,51 7598,51 7724,70 7674.70 7800.88 7750,88 7876,92 7826,92 7952.96 7902,96 8029,14 7979,14 8105,47 8055.47 8182,21 8132,21 8259.5i 8209.51 8337,09 8287.09 84!5.62 8365.62 8495,48 8445,48 8576,38 8526.38 8658,17 8608.17 8740,70 8690.70 DRIFT DIREC DEG, S49 S49 549 55O 55O S51 55O 550 55O 55O 549 552 551 551 551 551 552 552 551 551 551 552 S49 S50 547 548 548 548 S47 .OOE ,84E .84E .OOE .84E .OOE ,84E ,84E ,84E '84E .84E .OOE .OOE ,00E .OOE ,OOE ,OOE ,OOE .09E ,'09E ,09E .00E ,09E .00E ,09E ,OOE ,OOE ,OOE ,00E TOTAL COORDINATES C L 0 S U R E 5 DISTANCE ANGLE D M 5 2092.19 S 2127,79 E 2984,08 S 45 29 2134,54 S 2177.24 E 30#9,04 S 45 34 2t76.85 S' 2227,38 E 3114,47 S 45 39 2219,41 $ 2277.95 E 3180.39 $ 45 44 2261.94 S 2329.40 E 3246.92 S 45 DO 2304,06 S 2381.26 E 3313e47 $ 45 56 2346,!~8 S 2433.37 E 3380,36 5 46 2 2431J40 S 2537.77 E 3514.54 S 46 13 34 2473 ~ .,.. . 3581,08 $ 46 18 43 2589. ~' '"'4" ;':' '.', ,. L.... i ,-.!~ : ' F' I ~;:';> 2515,~'7a'5..~.2640,3~ E 3646,9! S 46 23 6 2637,57 S 2791,6i E 3840~55 S 46 37 30 2678,28 ~ 2861,87 E ' 3905,04 S 6& 41 5~ 2719,03 S 2892,21 E 3969,66 S 46 66 3 2759,35 S 29~2,9i E 4034,~0'S ~6 50 37 2799,36 S 2996,08 E 4098,89 S 48 55 30 0 E 2 E 26 E 44 E 30 E 38 E 33 E E E E E E E E 5 E 2839,73 S 2880,42 S 2921.00 S 2960,87 S 3001 ,'18 S 3042,12 S 3083,10 S 3123,73 S 3163.06 S 3201,55 S 3239.70 S 3044.94 E 4163.62 $ 46 59 50 E 3095.35 E 4228,24 S 47 3 35 E 3145.63 E 4292.69 $ 47 7 13 E 3195.83 E 4356.62 S 47 11 7 E 3244.81 E 4419,94 S 47 14 1 5 3292,82 E 4482.99 S 47 15 58 E 3339,22 E 4544,88 S 47 17 1E 3383,62 E 4605e06 $ 47 17 13 ~ 3427.30 E 4663.83 $ 47 17 45 E 3470.06 E 4721,36 $ 47 18 16 E 3511.68 E 4777.82 S 47 18 25 E DOG LEG SEVERITY DEGtlOOFT 0.646 0.833 0.000 0.753 0.452 0.175 0.564 0,250 0.000 0,750 0,596 i,085 0,649 0,090 0.410 0,250 0,490 0,000 0,591 0.250 0.000 0,835 1,!91 0.439 1.847 1.051 1.000 0,750 0,813 SECTION DISTANC 2982,84 3047,90 3113.43 3179.45 3246.09 3312,7D 3379,74 3447,00 3514,09 3580,71 ~646.59 3711,78 3775,21 3840,40 3904,93 3969,56 4034.15 4098.S6 4163,61 4228.23 4292.69 4356.61 4419,93 4482.98 4544.86 4605,04 4063.81 4721,34 4777,80 ~CO. DS GYrOSCOPiC SUrVeY JUNE 22, 1978 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC CO~IPUTER TRUE ~AS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES 5PTH ANGLE DEPTH SEA DIREC D ~ DEG, 3~u 33 15 8823,97 8773,97 547,00E 3277,46 S 3552,18 E DSO0 32 30 8907,96 8557,96 S47,09E 33!4,45 S ~591,9! E 0580 32 0 8975.62 8925,62 S48,00E 3343.27 S 3623,40 E XTRAPOLATION TO TOTAL DEPTH BY MSS DATA 0868 31 15 9220,84 9170,8~+ S40,OOE 3~5!,~! S 3728,22 E 0950 30 30 9291.22 9241,22 S38,00E OTTOH HOL~ CLOSURE D Z22.z~& FEET AT S CLOSURES DISTANCE ANGLE D M S 4833,19 S '47 18. lg E 4887,47 $ 47 18 2 E · 49~0,16 S 47 18 9 E 5080,81 S 47 12 !6 E 5122,46 S 47 8 14 E DOG LEG SEVERITY DEG/IOOFT 0,750 0,750 0,702 0,792 1.110 SECTION DISTANCE 4@33,17 4@87,45 4930,14 5080.81 5122,46 CO DS ASURED DEPTH AND OTHER · GYROSCOPIC SURVEY DATA FOR EVERY EVEN 100 FEET OF SUB SEA 'OEPTH, ,JUNE 22, 1978 MEASURED DEPTH TRUE VERTICAL SUB MD-TVD VERTICAL DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 150 25O 35O 45O 55O 65O 750 85O 95O 1050 !150 1250 1350 !450 1550 1650 1750 1850 1950 2050 2150 2250 2350 2450 2550 2650 2750 2850 2950 3051 3153 3255 3357 3460 B565 150, 250. 350. 450. 550. 650, 750, 850. 1050. 1150. 1250, 1350. t450, 1550. 1650. 1750, 1850. 1950. 2050, 2150, 2250, 2350. 2450, 2550, 2650. 2750, 2850, 2950, 3050, 3150, 3'250, 3350, 3450. 3550, 1CO O 200 0 300 O 400 0 500 0 6OO 0 700 0 800 0 900 0 1000 0 1100 0 1200 0 1300 0 1400 0 1500 0 1600 0 1700 0 1800 0 1900 0' 2OOO 0 2100 0 22O0 0 2300 0 2400 ' 0 2500 0 2600 0 2700 0 28O0 0 2900 0 3000 ! 3!00 2 3200 4 3300 7 3400 10 3500 14 465,13 465,36 465,71 466,77 467,47 468.29 ~69.23 '70.28 471.45 472,69 Z_~'l~Z'r~tE:i476.77 477,29 477,54 ~77,56 477,77 478,21 ~78,83 479,60 480,45 ~81,32 483,37 483,92 485,38 ~88,97 507,25 5i9,86 53¢,83 S S S S $ S S S S S S S S S S S S S S S S S S S S S S S S 100,05 100.14 100,28 100.47 100.71 100,99 101.33 101,70 102,13 102,60 102.89 102,87 102.57 102,01 101.25 100,34 99.36 98,39 97,54 96.79 96e18 95,78 95,60 95,67 95.97 96.49 97.19 99.24 105,57 118.32 134,21 150,46 168,12 189.00 2i3,10~ E E E E g E E E E E E E E g F_ E E E E E ,. E · E E · :0' DS 3-5 OTHER DATA FOR GYROSEOP!C SURVEY · EVERY EVEN 100 FEET OF SUB SEA DEPTH, · JUNE 1978 MEASURED DEPTH TRUE VERTICAL SUB ~Tkt SEA MD-T'VD DIFFERENCE VERT I CAL CORRECTION TOTAL COORDINATES 3671 3780 339! 4005 4122 422+3 4369 4497 4628 4759 4890 5021 5152 5284 5419 5554 5689 5824 5960 6096 6231 6367 6503 5540 6776 6910 7043 7176 730~. 7439 7570 7702 7836 7970 8!05 3650, 3600 3750, 3700 3850, 3800 3950, 3900 4050, 4000 4150. 4100 4250, Zi. 200 a350, 4300 4450, 4400 4550. 4500 4650, 4600 4750. 4700 4B50, 4800 4950. 4900 5050, 5000 5150. 5100 5250. 5200 5350. 5300 5450. 5400 5550. 5500 5650, 5600 5750. 5700 5850. 5800 5950, 5900 6050, 6000 6150, 6100 6250, 6200 6350. 6300 6~50, 6400 6550, 6500 6650, 6600 6750. 6700 6850. 6800 6950, 6900 7050. 7000 21 7 29 8 40 11 55 15 72 17 93 21 118 25 146 28 i77 31 209 ~i 32 240 i 31 .., 271 302 ' :,>,31" .~..,. 404 439 3 474 35 510 36 546 36 =81 35 617 36 653 36 690 37 726 36 760 34 7P3 33 826 33 858 32 889 31 919 3O 952 33 985 33 1020 35 1055 35 577,15 606,64 639,89 678.55 721,50 768,94 819.41 865,54 912,96 962.09 1011,64 1062,02 ........ .,.i.,.,,~,..,,1112.%0 >~""i'~:"i~iiii'li'I62,91 1381,68 1439.12 1496,80 1554,33 1612.41 1670,54 1730,60 1788,36 1845.07 i900,70 1956,03 2011.52 2066.36 2!22,02 2177.71 2234,83 2291,79 2348,55 240,49 270,49 306,34 345,72 388,70 437,54 493,97 559,46 629,26 699,08 767,44 835,45 903,79 973,72 1046,52 1119,19 1190e84 1262~92 1334,64 1~05,87 1476.92 1548,21 1619,91 1691,05 1763,37 1832,36 1900,31 1968,11 2033.27 2097.76 2162el1 2228,37 2296,33 2365.42 2435,96 E E E E E E E E .g g E E E E E E E E E E g E E E E E E E 'E CO 05 3-.5 AND OTHER DATA GYROSCOPIC SURVEY FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. JUNE 22, MEASURED DEPTH TRUE VERTICAL SUB DLCTH SEA MD-TVD VERT i CAL DIFFERENCE CORRECTION TOTAL COORDINATES 8240 8375 8508 8640 877! 8902 9033 9164 9296 942.7 9558 9638 9816 9943 10067 10190 10311 10431 ~0658 10785 10902 7150. 7100 7250. 7200 7350. 7300 7450. 7400 7550. 7500 7550. 7500 7750. 7700 7850, 7800 7950. 7900 9050. 8000 3150. 8100 8250. 8200 8350, 8300 8450. 8400' 8550. 8500 8650. 8600 8750. 8700 8850. 8800 8950. 8900 9050. 9000 9150, 9100 9250. 9200 1090 35 1125 35 1158 33 1!90 32 1220 30 1252 32 !283 3t 1314 31 1346 Ii 32 1377 ¢~ 31 1438 '<>. ~ 0 ~ "'~ 1540 23 1561 2! 1581 20 !600 i9 1618 1635 17 1652 17 2406,23 2463.54 2519.ii 2572.89 '2625.78 2679.06 2732,41 2784.95 2838,14 2891,40 2944.33 . ,,,2996,13 b i%LJl! (3100.80 3197.74 3243.89 3289~05 3332~50 3374,95 3419,28 3465.36 2506,24 2576,19 2644,30 2711.42 2777.06 2842.85 2908.84 2975,66 3042.89 ~108.91 3174.74 3238,89 3300,49 335.8,33 3~13~00 3465.82 3516.18 3554.60 3611,47 3657,12 3699,83 3739,42 E E E E E g g E E E E E E E E E E E E , , ' :C:~{;'.%:':,,*.',/' ,. ':,?,,~7;:' ~ ~i:;.':: '~,;-~': ;!4, ,," · ,,,. ::'!:: ? ~:?:>!:::. :.,,:, ,,.f ,.:.: DS GYROSCOPIC sURVEy JUNE 22, 1978 NTERPOLATED VALUES FOR EVEN TRUE MEASURED VERTICAL DEPTH DEPTH 1000 999. 2000 1999, 3000 2999. 4000 3945, 5000 a733. 6000 5479. 7000 6217. 8000 6972. 9000 7724. lO000 8495. !000 FEET OF MEASURED DEPTH, SUB · SEA TOTAL COORDINATES 949, 1949, 2949. 3895, 4583, 5429. 6167. 6922, 7674, 8445. 470.85 S 102,36 477.95 S 97.15 485.75 S 111,21 676.78 S 343,95 1053.87 S 824,60 1456.12 S 1355,64 1882,86 S '1878.28 2304.43 S 2380,95 2719.03 S 2892,21 3123.76 S 3383,59 " _ ............. - ....................................................................... HORIZONTAL_.._VI.EW ........... ~. ATLANTIC RICHFIELD COMPANY · - ' DRILL- SITE 3-5 ...................... ~ ........................................................................................... RADIUS.--OF.- CURVATURE · - ' .... GYROSCOPIC SURVEY .......... ~ ........... SCALE' ' I"= I000' . .... ~ .......... · .... .~ . ....... ...... . ~ ....~ ...... ~ ............ . . ~ ......... ~ ~ ...... ~ ............. ................... ; .............. ~ .............................. ~ ......... = ........................... - ~ ................. ~ ............................................... ~ ......... ,~ ..................... t ................................ - ~ ..... : ................................. ~ ..... ~ ........... ~ .................................. ~ ........ = ....................... ~ ~ ...... ; ................... , ..... : ........... ~ .......... [ ' .............. ~ .... ~ ...... . . ~ . ~ [ r ........................ + .................... ...... } .............. ~ , .......................... : ............ - ~ ..... ~ ..... , ~ [ .................. ;. . _ _ ~ ................ ................. ~ ................ ...... ..... ............. ~ ............. ~ ................ .... ;" -'-~ ..... ~'~-"" ........ ~"---~" -~"-'~'"~, '/'"' '- ~-'-~-'~ .......................... : , :, ................... 1 .......... : ..... ~ - , ' .: ........ ; .......... ~ ..... : ............. ; ......... ~ ............. ~ .......... , .............. ~ ...... ................ ; ...................... ~ ....... { ...... .... : 76~ : ........ , ~000 : , ........................... ' ...................................................... [ 84~ ........ ~ ............... ~ .... " '. -. ..... 6800 ....... ; ................. ........ - 9200 , - . . . ..... TVD = 9291 __ ' ' . ................ VERTICAL_SEC.TJON · ...... ATLANTIC RICHFIELD COM'PANY ' DRILL SITE - ~;5- ;- ' ' " .......... ~ ...... ! .......~ ........... RADIUS ~OF_~CU ~VATUR E..~. .. i - GYROSCOPIC SURVEY ~ .- ".' ~ . ' ......... '. ...... i . .............. - .......... ALL' DEPTHS SHOWN ' ; ............. ~ ......... ~ .......... .......... : ......... . .._', ...... ; ............. ~ ....... : "~ ....' .....'. 7~.'. ~ '"; ~.'.'.;;;_;L';7_~;i'_;'i' ..... ; ..... '~ ..... ' - .. : .... ' - ' ......... ~ .......... ~ ......... - _ . ~. ~ ..... : ~ ........ , .................. ~ ...... ~ .... . .......................... : ~ E .......... ; ............: ..... ~ ....... ~ ......... ........................ :...: ......... ~ .... . ...... ' ' ---x .... : ......... ~ ....... .: ........ :.: ..... --. ;' .... ' ; · ~~- .. · ......................... ' ........ ~ .... '_.. TMD = 10~950' ..... - .......................... Nortll Ala~ka Post Ollice~~-' 1G0 Anchorag ~.~ka 99510 Telephone 907 277 56:]7 August 11, 1976 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subje~31-14-10-1 5) ~6 (13-1-10-15) NGI #8 (21-11-11,14) Dear Sir' Enclosed please find the Monthly Report of Drilling Operations for the above mentioned wells. Si ncerely, ,.. .. __ , t!~-!~ .'-:'"-':.:[ __ Is .:",':e,~ ! ,,.'.. ' ' . -- . '"['ii. El C. R. Knowles District Drilling Engineer CRK/jr Enclosures Form I~'o. I~IL'V, $- 1-70 · STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 2. NAME OF OPEI~ATOR Atlantic Richfield Company 3. A DRESS OF O~EP~TOR P. O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL 1551 'N & 762'E of SW cr Sec 11, TION-R15E, UM SUBMIT IN DUPLICATE APl NUA~[ER1CAL CODE 5O-O29-20222 6 LEASE DESIGNrA'I'ION A.~'D SERIAL NO. ADL 28332 '7 IF INDIA~, ALOTTEE OR TRIBE NAME 8. L.~IT F.~t{A~ OR LEASE NAME )rudhoe Bay g WELL N'O )S 3-5 (31-14-10-15) 10. FIELD A_ND POOL, OR %VILDCAT )rudhoe Bay - Sadlerochit Pool 11. SEC., T., R., M.. (BO'I'TOM HOL,E OBJEC~rVE) Sec 14, TION-R15E PERMIT NO. 76-57 13.REPORT TOTAL DEPTH AT F2qD OF MONTH, CHA. NGES IN HOLE SIZE, CASING AND CEA~F_~TqTINGJOBS INCLUDING DEPTH SET AND VOLI3qVIES USED, PEP,2'ORATIONS, TESTS ANT) 1RESULTS. FISHING JOBS. JI3'NK IAI HOLE AND SIDE.TIR~.CKED HOLE A~qD A/qY OTH]SR SIGNIFICANT CI-IA. NGES IN HOL~ CONI)ITIONS. Report on operations for the month of JUly.. Spud @ 1230 hrs 7-19-76. Drilled 17½" hole to 2734'. Ran 13-3/8" 72#, MN-80 Buttress csg w/shoe @ 2708 and FC @ 2625'. Cemented w/6281 sx PF II cmt. Landed 13-3/8" csg, NU and test BOPE. Drilled cmt, FC, shoe and formation to 2744' Tested formation to equivalent 11.1 ppg. Directionally drilling 12¼" hole @ 10,~00' on August 1. mG~:~ ...... .. :T,.~.District Drilling Engine_eg^~ NOTE --Rel)ort an this farm is re¢luired fo~ each callndar ~nth% regardless of t~e ,totu$ of operations, and must oil and gas conservation commlffee by the 15~ of the ~ucc~ding mon~. unle~ otherwi,e directed. STATE of ALASKA ~.DEPARI~.~ENT ~jF NATUP~L RESOURCES Oivision of Oil and Gas . TO: ~-- Hoyle H. Hamil ton Acting Director Harold R. Hawkins Petroleum Inspector DATE : August 4, 1976 SUBJECT: BOP Test - Prudhoe Bay, Arco Sec ll, TioN, R15E, UM Drill site· 3-5, Pe~it .,No. 76-57 June 21, 1976 ~- ~,~ent to Prudh°eBay by. ~ien airlines for a BOP test on DS 3-5 ~~et Buck Rice ~who is the o~rator.. . I inspected the location which i.s in good shape. The mud pit was well bermed, there was a steel fuel tank· not berm~ed, and the well sign was up with all the data OK. Accumulator master gauge showed 3,000 psi. Jack Murphy, Rowan pusher, and Buck Rice checked out the accumulator and actuated all valves. They shut off all pumps to check reserve psi after all clos.ures were done at one time on the stack. Psi hbld 1250.. Psi after all closures was OK. June 22, 1976 - b~e started testing at 9:00 AH. The~ hydril was tested 3000 ~pe rams, the inside valve on the choke tine, and check valve on the kill line tested 5000 psi.. Also they have two spools above the casing head with two HcEvoy 3", 5000 psi valves on each spool. , plus two HcEvoy 3", 5000 psi valves that also tested to 5000 psi on the casinghead. The extra spool in tOO stack is. for ~mergency in case the choke and kill line are tied up. The lower pipe rams were tested to 5000 psi. The nitrogen back up bottles have 1800, 2300," ~300, 2300, 2300, 2300 psi. There were six back up bottles. The test plug was pulled and the blinds tested to 500,q psi. There are ten valves on the stack that held 5000 psi. Also in the cellar there are 7 lo~,~ torque wing valves that held 5000 psi. The control panel on the floor was actuated for proper function. All valves on the manifold were tested to 5000 psi, plus the superchoke fully closed to 5000 psi. There are two manually operated choke valves in the manifold, 13 win? valves, and 2-3 flanges on the manifold. All held 5000 psi. There is one ball valve and one dart valve on the floor.· They are OK. Upper and lower kelly were tested to 5000 psi They were also OK. Finished test at 4 aO PH. in su~m~ary, I wifJ~essed test of all valves on thb stack plus BOP and F~anifold, plus testing accumulator psi before .and after closure with and without pUFnpS operating for proper workin~"order. All tests were made with mud and water and koomey pump~ There were no failures. All tests held psi for 10 minutes. Attachment sat~is~6~ory]~L~.~ ~'Typ~]Insp~e~.iOn~- ~' - ~ --' :'.'< .~..~?SatisfactOry.-'~. ~Pe. Inspection ):~.?[oca~i-6:fi-,.G6~eral... ~.' :~ Y~s.~ :~].No' item ~) BOPE Tests :::'- .'>~; ' : ~'~' (~)."-' (..):- ' ~/fl~asi'n, .set' mt'~oPen~-')filled:' ~) ( ) 1.7. Master Hyd.-Control .' -' ' .~) ( ) 18. N2 btls.~,~~ Valve Tests ~ ( ) 19'. Remote Controls ('~) }'(~"): ..?'5~i,~Sur]f..a~.c~,No. Wells ~ · '.' ~ ( )'Well TeSt Data (<..).<i"i() 7. Well Nos.~, . , , (<) .(<)/ 8. Hrs~ obser, . ,. ,__ ( ) (-)' 9. BS~.W ........... ~ ..... ~ , ( ) ( ]'"'.~0~]-'~'. Bbl ~'.' ' ( ) Final Abandonment ( ) (). 11. P&A Marker ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 13. Clean-up ( ) ( ) 14. Pad lev61ed Total.' i:nspection observation time hrs/days 0() ( ) 20. Drilling spool-~//,,outlets : c~)~ ( ) 21. Kill Li.ne-C)(')C~eck valve' . ( ) 22. 'Choke Flowline ( ) HCR valve 0() ( ) 23. Choke Manifold No. valvs/_~__flgS~ , ()0~ ( ) 24. Chokes-(~()Remote~()Pos\~!A,dj. ~ ' (X) ( ) 25. Test Plug-.(~)Wet~.~d( )'csg( ~I ( ) 26. Annular Preventer~~sio ( ) 27. Blind Rams,~ps!o 0() ( ) 28. Pipe Rams_5-~s~q. ~) ( ) 29 Kelly & Kelly-cock.~mffff psig (~)(I i) 30.'Lower Kelly valve~4-~psio l'(j l(}<ta". ) ' 31 Safety Floor valves-Z-(-~-)-BV :[~<)Dart number leaks and/or equip, fail.ures cc ~/~d~.~. .~6~/~/Z~--.'S'. . . -Notify: in~--- days or when readY ~ Inspected by.~/(/~;/f'/~ ~ _ Date Di vi si ~ of Oi 1 andnGas 3001 Por~pine Drive, A~chorage, Alaska 99501 June 22, 1976 P~dhoe Bay DS 3-5 {31-14-10-15) Atlantic Richfield Company State Permit No. 76-57 C. R. K~owles District Drilling Engineer Atlantic Richfield Company P. O. E~ox 360 Anchorage, Alaska 99510 ~ar Sir: Enclosed is the approved application for permit to drill the above referenced well at a location in Section 14, Township ION, Range 1SE, U. M. Well samples, core chips and a mud log are not required. A directional survey is required. Many rivers in Alaska and their drainage systenm have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder {Title 5, Alaska Administrative Code}. Prior to commencing operations you may be contac~d by the Habitat Coordinator's office, Depart- ment of Fish and Game. Pollution of any waters of the Sta~ is prohibited by AS 46, Chapter 03, Article 7 and the regulations prolmulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to cmmmencing operations you may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a representative of the Division may be ?resent to witness testing of blowout preventer equipment before surface casing shoe is drilled. C. R. Kno~les -2- June 22, 1976 In the e~t of suspension or abando~t please give this office adequate advance notification so ~at ~ ~ay 'have a witness present. Very 'truly yours, / ~ai~n Alaska Oil and ~s ~nservation C~tttee Enclosure CC: Apartment of Fish and Game, l~abi~t 'Section w/o encl. Department of Environmental Conservation w/o encl. ~rtment of La~r, Su~rvisor, Labor Law Compliance Oivision w/ encl. tti?hfieldCompany North America- roducing Division North A~aska D~¢,~rict Post Office Box 360 Anchorage, A~aska 99510 Telephone 907 277 5637 June 17, 1976 Mr. O. K. Gilbreth State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Subject' D. S. 3-5 (31-14-10-15) Dear Mr. Gilbreth: Enclosed please fi nd our Application for Permit to Drill D.S. 3-5 (31-14-10-15) along with the $100.00 Filing Fee. The required survey plat will be submitted as soon as available from the survey company. We would like to bring to your attention that we have re- quested BP Alaska, Inc. to cancel D.S. 3-5 (11-15-10-15), Permit No. 76-53, API #50-029-20220, originally proposed to target at 1320'S and 1320'E of NW cr Sec 15, T1ON, R15E on BP's lease #28331. The drilling of that well has been deferred to a later date. We have retained the same Drill Site 3-5 identification since the surface location will be the same. For your information, as well as for the State Department of Labor, this well will be drilled from the surface loca- tion on lease ADL 28327 and target location on Lease ADL 28332. The effective date is October 1, 1965, with a termination date on March 27, 1984 on both leases. Yours very truly, C. R. Knowles District Drilling Engineer CRK:cm Enclosures STATE OF ALASKA SUBMIT IN TR '-~-?ATE (Other in.m-u~ on OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN I~. TYPEOF WORK DRILL ~ ~ TYPEOF WELL OIL GAS WELL [~ WELL ['--] OTHER 2. NAMEOF OPERATOR/ Atlantic ~chfield Company DEEPEN 3. ADDP. F~S OF OPERATOR P. O. Box 360 Anchorage, Alaska 99510 vailc--'lON C'F ()If. A.;.t:'.) (':.,..,, 6. LEASE D 'F-E~IGNATION AND SERIAL ADL 28332 Fill': '~'lr FA~I OR ~ASE DS 3-5 (31-14-10-15) Prudhoe Bay-SadlerochSt u. sm.r. m, HO~ OBtain) Sec 14, T10N, P~5E 4. LOCATION OF WELL " 1552'N & 763'E of. SW cr Sec 11', T10N, R15E, UM . . At proposed prod. zone · 1320'S & 1320'W of NE er Sec 14, TZON, R15E, UM ial DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Well site 5 ~iles NE 6f Deafl~orse, Alaska 14. ~OND INFORMATION: ~Statewide S~e~/.~lo~o. Federal.Insurance Company (/8011-38-40 ~o.., $100,000.. , 15. DISTANCE FROM PROPOSED · LOCATION TO NEAREST PROPERTY OR LEASE LINE. FT. :. - (/Uso lo nearest dsig, unit, if ahy) [ I6. No. OF ACRES IN LEASE .. .1.320' -.~ . 25'60 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELLDRILLING, COMPLETED, OR APPLIED FOR, FT. .. 2600' (DS 3-4) 21. ELEVATIONS (Show whether DF, RT, CR. etc.) ___61_' 'P~KB 28 ) Pad Elevation 23. 19. PROPOSED DI~PTH 9500'TVD 11,160'-+MD PROPOSED CASIN( AND CEMENTING PROGRAM 17. KO.ACKES ASSIGNED TO THIS WELL f 320 .... 20, ROTARY OR CABLE TOOLS - Rotary 22.APPROX. DATE WORK WILL START · . July 10, 1976 _ . Zo,; .... ~t--z0-':' " '94'~-'- ....... ~_~o .. -' 8o'~ - ci~ to-~~ ~p~ox'~'~o ~ ~ .1 ..... ~3-3/_8" 72# ~-80 2700'i- .... ~<c-to sur2ace 5500 sx PF ~ . ,~". ,._ :.. ~-s!s" ~ . ~-~o~ ~.-~0'~. . ....... ~% ~'~'~-~o0~_ c~ "c ...... ~ ........ gOO-OS . 2nd ~ta~a- 300 ~x PF "C" . . , II · Atlamtic Richfield Company, proposed.to directionally dril!..this wellto'.9500'TVD(±ll,160'Ml ".to produce the Sadlerochit Zone. Logs will be run.across selected, intervals' Because this 'is ~he ·fifth well on this drill site and there has been no shallow ~as encountered above 2700' ., we .request Conservation Order 137, Rule 4(b) be waivered for the annular - preventer on the conduCtor. A 13-5/8" 5000 psi Hydril,two 13-5/8" 5000 psi pipe rams · and one blindram will be used on..13-3/8", and 9-5/8"'casing. The BOPE will be pressure 'tested weekly and operationallytested each trip. A non-freezing fluid will be left in all.uncemented annuli within the permafrost interval. A single 5-1/2" tubing string, packer and appropriate safetyequipment will be run and the well left.un~erforatedo .. · , ' ' ~ ~0~ SPACE D~C~BE PRO~SED PROG~M: If ~o~I is to d~-'pen ~c ~ on ~nt p~uct~e ~nc and pm~sed · ~w produ~ve zone. If p~o~ is to ~ o! d~n d~ecfionally, ~ve pertinent da~ on sub~urfa~ ]oe~fio~ ~d m~u~ ~d ~ue Wrti~ ~k'p~ Give blowout lri~e~nl~ . DATE 6-17-76 District Drilling Enginee~ TCILE (l'hJs q:~ce for Stile oflia use) SAMPLF..g AND CORE CroPS REQUIRED DIRECrlONAL SURVEY REQUIRED I--IVES [] NO MUD LOG CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: [~ NO £P.I. NUMERICAl. CODE NO. APPOVED BY APPROVAL DATE .TITLE *See Instruction On Reverse Side .. DATE. June 16, 1976 Mr. O.K., Gilbreth State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Ak. 99504 Subject: Well D.S. 3-5 (31-14-10-15) Prudhoe Bay Field Dear Mr. Gilbreth: We have reviewed a copy of Atlantic Richfield's Application for Permit to Drill the subject well from a surface location of 1552'N & 763'E of SW cr Sec 11, T10N, R15E, UM to an 8800' subsea target 1320'S & 1320'W of NE cr Sec 14, T10N, R15E, UM. We understand the well is projected to be 3960' East of BP lease ADL 28331 at TD. BP Alaska, Inc., being an affected operator as per paragraph 27,050, Title II, Part 3, of the Alaska Administrative Code, has no objection to the drilling of the well. FILE: Very truly yours, BP ALASKA, INC. G. D. Taylor Manager Operat±ons Form :10-401 ' REV. 1-],-71 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN TRIP~. .rE (Other instructions on reverse side) PERMIT TO DRILL OR DEEPEN la. TYPE OF WORK DRILL ~ b. TYPE OF WELL OIL GAS WELL [~ WELL ~-] OTHER 2. NAME OF OPERATOR Atlantic Richfield Company DEEPEN SINGLE~ MULTIPLE r-"[ ZONE L_J ZONE L_] 3. ADDRESS OF OPERATOR P. O. Box 360 Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 1552'N & 763'E of. SW cr Sec 11, T10N, R15E, UM At proposed prod. zone 1320'S & 1320'W of NE cr Sec 14, T10N, R15E, UM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Well site 5 Miles NE of Deadhorse,:Alaska 14. BOND INFORMATION: API # 50--102~20222 6. LEASE DESIGNATION AND SERIAL NO. ADL 28332 7.IF. INDIAN, ALLOTTEE OR TRIBE NAME 8, UNiT FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. DS 3-5 (31-14-10-15) FIELD AND POOL. OR WILDCAT Prudhoe Bay-Sadlerochit Pool 11.SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 14, T10N, R15E 12. ~Statewide Sur~,~,na/o, No. Federal Insurance Company #8011-38-40 Amount $100,000.. , 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest drig, unit, if ahy) .. 1320' .~ 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2600' (DS 3-4) 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 61' 'RKB 28' Pad Elevation 16. No. OF ACRES IN LEASE : 25'60 19. PROPOSED DI~PTH 9500'TVD ll,160'-+MD .. 17. NO.ACRES ASSIGNED TO THIS WELL ;* 320 20. ROTARY OR CABLE TOOLS Rotary 22.APPROX. DATE WORK WILL START . . July 10, 1976 23. PROPOSED CASING AND CEMENTING PROGRAM SI~OF,HOLE SIZEOFC~ING ~IG~PERF~T.' 'GRADE , SEI~HNGDE~. Quanti~yofcement ,. . .., 20" 20''' 94# H-40 80'~ Circ to. surface approx 350 sx PF _ 17½" 13,3/8" '' 72# MN-80. 2700'~ Circ to.surface 5500 sx PF II .12¼" q-5/g" 47# MM-80&. 1l:]60'~ .lst stage 1500 sx Class G g00-q5 2nd. stage, qO0 sw PF "C" , . II Atlantic Richfield Company. proposed.to d!rectionally drill this well. to* 9500'TVD(±ll,160'MD) to produce the Sadlerochit Zone. Logs will be run across selected~intervals~ Because this is the fifth well on this drill site and there has been no-shallow ~as encountered above 2700', we request Conservation Order 137, Rule 4(b) be waivered for the annular preventer on the conductor. A 13-5/8" 5000 psi Hydril,two 13-5/8" 5000 psi pipe rams and one blind ram will be used on 13-3/8" and 9-5/8" casing. The BOPE will be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A single 5-1/2" tubing string, packer and appropriate safety equipment will be run and the well leftunperforated. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and t~ue vertical depths. Give blowout preventer program. District Drilling Engineer TITLE (This space for State office usc) CONDITIONS OF APPROVAL, IF ANY: SANIPLES AND CORE CHIPS REQUIRED MUD LOG OTHER REQUIREMENTS: DIRECTIONAL suRvEY REQUIRED ~gfLYEs U NO ! ~mT ~O. 7 6- ~ 7 J' *See Instruction On Reverse Side A.P.I. NUMERICAL CODE 50- 029-202 22 APPROVAL DATE Chairman ... TITLE, June 22~ 1976 June 22, 1976 DATE Form IO-40X ~. SUBMIT IN TRI. ~ATE REV. l-Z-7Z (O~ i~ions on r~e~ ~de) ,STATE OF ALASKA OIL AND GAS coNSERvATION__ __. COMM I~EE, ~'. PERMIT TO DRILL OR DEEPEN L~SE D~IGNA~ON ~ SEPAL NO. ~L 28332 ~LL ~ ~ER ~ ~ , ~h~ .) · ~ ~'~ ~" I Prudhoe Bay la. TYPE OF WORK b. TYPE OF ~ELL OIL WELL ['~ NAME OF OPERATOR/ Atlantic Richfield Company WELL NO. DS 3-5 (31-14-10-15) 3. ADDRESS OFOPERATOR P. O. Box 360 Anchorage, Alaska DIVISION OF 99510 '~40~0~,~,~,,,~ · .. 4. LOCATION OF WELL . ' - . At ~ufface 1552'N & 763'E of. SW cr Sec 1!, T10N..,,'K15E, UM . - At proposed lxod. zon~ 1320'S & 1320'W of NE cr sec 14, T10N, R15E, UM I0. FIELD AND POOL, OR WILDCAT Prudhoe Bay-Sadlerochit Pool 11. SEC., T., R., M., (BOTIOM HOLE OBJECrlV~ Sec 14, T10N, R!5E 13: DISTANCE IN MILES AND DIKECrION FROM NEAREST TOWN OR lOST OFFICE* 12. . Well site 5 ~iles NE Of' Dead~orse, AlaSka ,...- . 14. BOND INFORI~%~1ON: ~m~tatewide Sa. rT,,aiD, No. Federal.Insurance Company #8011-38-40 A=o-,t $100,000, , 15. DISTANCE FROM PROPOSED * : 16. No. OF ACRES IN LEASE 17. ND. ACRES ASSIGNED LOCATION TO NEA~ ' : i 0' '" : 25'~0 ' TO THIS320WELL f PROPERTY OR LEASE LINE, F~.. - 32 ':" (AISO to nearest ddg, unit, if ahy) " 3~' --- '" :' ' .... 18. '' 20. ROTARY OR CABLETOOLS DISTANCE FROM PROPOSED LOCATION TO NEARF, ST WELL DRILLING, COMPLETED, . . OR APPLIED FOR, F~. -.. 2600' (DS 3-4) 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 61' 'RKB 28' Pad Elevation 23. 19. PROPOSED D[.PTH 9500'TVD 11,160'-+MD ~. PROPOSED CASING AND CEMENTING PROGRAM Rotary APPROX. DATE WORK WILL START July'10, 1976 SlZ~ OF HOLE SIZE O~ CASINO WEIGH~ i~R FOO~ ' GRADE 'SETTING DEI~TH " Quantity of cement "' , , 20" .' ' '20"" 94# ... H-40 _. 80'-~ Circ to surface approx'"'350 sx PF '3 "'8" ' ' 17~" I ~-,~/ 72# MN-80 2700'~ Ci.rc to surface 5500 sx YY II ]2~" - q,5/8" 47~' .. MN-80& ~].]60''~ ]st sta~e ]500 s× C]asm G _ ,,, " ,, ,q00-qq ,, , 2nd stmE~ · 300 .qw PF ."C" , , , , II . ' Atlantic Richfield Company. proposed.to directionally drill this well'to:.9500'TVD(~il,160'MD) .-.-~.to produce the Sadlerochit Zone. Logs will be run.across selected, intervglS~. Because this 'is the .fifth well on this drill site and there has been no shallow ~as encountered "- above 2700' .. ., we .request Conservation Order 137, Rule 4(b) be waivered for the annular .. preventer on the conductor.. A 13-5/8" 5000 psi Hydril,two 13-5/8" 5000 psi:pipe rams .'-:- and one blind-ram will be used on.-13-3/8" and 9-5/8"'casing. The BOPE will be pressure tested weekly and operationally tested.each trip. A non-freezing fluid will be left -'-- in all.uncementedannuli within the permafrost interval. A single 5-1/2" tubing string, "-- - packer and appropriate .safety 'equipment will be run and the well left .unperforated. _ · . . ' ~ '"" ' IN ~OVE SPACE D~CRIBE ~OPOSED PROGRAM: lf~opoml is to deepen ~¢ ~m on ~e~-nt productive ~ne and pro~sed ' ~ ~odu~ve zon~ If propo~! ~ to drill or deepen d/rect/onaLl~ ~e pertinent da~ on ~b~rface locafio~ ~d m~ured ~d ~e vertical depths. G~e blowout lnveent~ priam. 24. I het'~y certify .that the~,Fo?gj~g is Tm%t~l Cortezt DATE, 6-17-76 District Drilling Engineer , , . . , (This space for State offic~ use) SABLES AND CORE CmOS ~qUmEO { I O~s [] NO DIREC~ONAL SURVEY REQUIRED E]Y~ r'l ~o , ,,., ,. , PERMIT NO. CONDITIONS OF APPROVAL, IF ANY: MUD LOG C1 ~s D~o OTMER REQUIREMENTS: A.P.I. NUMERICAL CODE . APPROVAL DATE , APPOVED BY. TITLE *See Instruction On Reverse Side DATE. , CHECK LiST FOR NEW WELLrrxr, lTS ~ .... I-s the permit fee attached Company //~ F'-(] Yes 1to Remarks · · , . , · . o , . . . . · o . · · o ~ ~ 2. Is well to be located in a defined pool . .3. Is a registered survey plat attached ~. Is well located proper distance from property line . 5. Is well located proper distance from other wells . . 5. Is sufficient undedicated acreage available in this pool ~? Is well to be deviated ....... ~. Is operator the. only affected party Can permit be approved before ten-day wait . . . 3. Does operator have a bond in force ......... 1. Is a conservation order needed ............... 2. Is administrative apFroval needed 3. Is conductor string provided ........... Is enounh cement used to circulate on condUctor and surface ? Will cement tie. in surface and intermediate or production strings ,, 6. Will cement cover all known productive horizons . =~ ' fresh water zones 7. Will surface casing prou~c,. ...... 3. Will all casing give adequate safety in collapse, tension & hurst 9. Does BOPE have sufficient pressure rating . oval Re'-dommence.J' '~ 'i:: ' dd~t~onat Requirements~ Geology Enaineerinq' TP,,N~ H!iK ~-=-OKG ~ HHH UAL qC'.i?' LCS JCM __~ Revised 1/15/75