Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout210-144 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate IZI Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other: h1 g,'4 a c;c4 n'r 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 210-144 3. Address: P.O.Box 196612 Anchorage, Development a Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20717-03-00 7. Property Designation(Lease Number): ADL 0028258 8. Well Name and Number: PBU S-01C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12413 feet Plugs measured feet r1 true vertical 8905 feet Junk measured feet NOV V 2 4 2015 Effective Depth: measured 12089 feet Packer measured 9517 feet true vertical 8894 feet Packer true vertical 8666.59 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 28-108 28-108 Surface 2667 13-3/8"72#L-80 27-2694 27-2693 4930 2670 Intermediate Production 6019 9-5/8"47#L-80 26-6045 26-5364 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10290-10710 feet 11450-12030 feet 12060-12083 feet 11206-11218 True vertical depth: 8901-8887 feet 8923-8897 feet 8895-8894 feet 8840-8845 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 10290-12083 Treatment descriptions including volumes used and final pressure: p�to®gk�Ci�1�9��� 9 571 Bbls 3%NH4CL,108 Bbls 12%HCL,95 Bbls 9:1 Mud Acid. ;� JAN 2 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 153 153 528 1381 191 Subsequent to operation: 130 60 469 1282 240 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations EZI Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A q„.../ CdiPhone +1 907 564 4424 Date 11/23/15 ' Form 10-404 Revised 5/2015 ` `� ( e BDM& UEC 0 12018 l I/ Submit Original Only • • a) . o 0 o 0 O co N. CO N O CO I- O Cn G N N O U j o 0 0 p O o N- CO O C) O 6) CO CO co co co (`') O co CO co O 0) CO N- O V CO M co co CO N- N in co p o co co I— N "— co co I— CO N N- C0 N N N ( N CO O cY Cn O N N V E OC1) NCA " O O ON V Cf) ▪ N CO 0) (7) O) C.) 0 *-' U Q • O CO N CO N- CO V CO CC) C3) Cr) ' N N NCO N N t7 '^ C0 0) 0) .▪Q nM W a p p O 0 CO 00 CO C) = J coJCO oJ J = d C,'") N *k J .U) N x CA O COO QO N - _ U N C? CO C7 I I 7 O N Cr) CO N- D)CCO - 0000CON = CO CO O CA CO - CO J N CO CO N C)) Z • O '7)• ° 00 O O LL OC[ Z Z z EtO w w COm OZZDD 0 (n d J J I— I— • • m U co d a) • L a) O E 48. N d V d• dO. • Q J • o co • F— m Q (n a. X a`5 a) N �c - L a3 +, a) m - Y - C m N N I- M V 4.0I- Q NI- N 0 > Nvcr co U) Cr) co 00 cn 13 CI- (1) (1) ao C N- V 2 co 1.0 Lo a) a) a � � Y a) WW0 UUa Eo U U Z o 0 0 ch ch • • i o cn I - 2 2 c c 3 a o ) ° E c cn 0 w Q I� `n ° H ' N c � ° E 0 D m J O a) H N M U — N a) a) ca — N 2 3 c 2 z -- u) o - c 3 U 0 N * 2 cn c n U V Q Q 0 _ 0 * J J + 2 o N• 3 as E E .� _o a) D o- 7 n O o) H fn cn Lo 2 N c Q -o a.d OM co U in EC) LL al -0 H U) c >'. N 0) "0 D a L*L m O O 0• O "a c u) �C)`�C)` W a) — v* s C to O Q c 2 Q (n rn d + O) J c -3 Q .c O H OOH Ct E 0 co m = 3 (1- H o ° U (n HHQ 1 m o 1 _� ° +� U CO a) m d' Q H a) N Z C N g o a) 3 Q g ( in W 5 cn o E c a� * 1 E o E U Z W LL J00 > .5 1 c QI- m o- a) d - 2 N > C 000 E2 to a) mU � ami a°i _1 o 0 0it) 1;.1o W>- H W' UJ ~ N c LL 2 — 0) M •c p 2 co c0 in a) E La 2 J J wail= 0 p o 2 co Z 0 co 2 N C E co N L 7 O ci pl C. 2 QQZ c H 2 � >0 ° � ��l CO °-'nom E .0) 0- ( c 0 D m m 0 H O d H ° > -a 1 v� � N- ch Z U ) c o - x- -.I -J < -0 0 .- - 20 QQ 0_ Lu c ami G1 O 22 < 0 c CO CC �� m _0a � Q = = �Q QV C * QQa c D -0 a) 2 I-) CI- CI- Q > o * * (n (n W 2 C N O 1 _ * c 0 * - - R' mU OL o ' � N oaH � W' C) H * a) a) CO0 L m Ji\INQ .- .- 2 -O * ca -E f�0 0 Z D ca mi d >, U * a 0 d > N , cc ° H = * L 1- 0-0 , 0 D = 2 E (a LL c C* C C ° * fl. Qa E ou) EH cu o * � E nam a_ � ( Q a>) _ U _ 1 N -o E -. ci)0 > Ce G1 ck < 3 H cp 1 .N Odd 3 ° co QwWp = ,n o � N � � C � iN � � d a) _a cin 0_N � Q pD o OD U Z U N QU Q O N QU N m �� N Q Ti la c) N C `n U W * > > 2 0 --, -a2Li O N O N co (' b00 co � U -0 oi0 -o O ° CnIcecA U -a4Za •UZ , ink ' Nina Z .Nv- fn 0) .- 1 U) II 2 0 0 o N 1 cn Or m 6O .� _ 22u) Qa0 - - 0 -(T) °t- T c E U2C`DaZNc� a o-� Et Lo OHHLL En C . .c(ft) `mom o ° * - 4-7 cmZ c2a ; o p o 0) o * * __I IA v �^ . p co • 0Q0 rn 1 H * 'r• 0 o - - s .0 ' d w as v � .6 u_ J 4_, Et - 7 - tO Z .c c 7 0 CC `- Qin o\O — L- O H U JppJ c * ai I c Qj4— ccn 6 cov) 3 ai = c' coo 3 a) c = .c ai I1 c ca cm W w w W 2 c co .. 2 c OD '+>-., „C° 2 5 O > OD .. c N (n N J c c •c 7 r 2 c IHiIHi 0 0 4 UH o % O - > o O II % U •- m a) QU a) 0 c to O 'a 5 � _ ° UU = a) ca0 � UO = a) Q) a) > -ci Ev EU o o ca = m * Qom * cn UHC * H �}a c2o * - c5HT m .n U = 2 a) * O Q E * aa * < 0002 * U0cn 3Uco * HN00H -o ca < dzU * * o -DLLQ a w H cn cn in cn cn 1.0 0 a- 0 0 0 0 0 0 0 0 � N N N N N N N N N N M CO 'Cr > O O O O O 0 0 cv CV N CV N O T- Q • S 0 E \ 0 � / A / § f -/ k I � < 2 z E E m o 5 t \ E \ « U o CT2 _ / a ± ® t / 27 TU , 2 > . > ± m ± m / i * 22e0E % $ / ° / o / % «kc » * 9 •cssa C I n 0 O O o cyfO £ 4 £ cE o_A ° a_ -4 4' - of ( & $ ac � _ U) '» 0 / § / / j / c f k ƒ o e ® © I » Q u # o e ' I a F.-- CL 4 3 O 6 E IP ca aE / / \ / E o 7 ( eL / 2 � H r e I— r o o E E E ® 0U ) _c 04 00 / / % / _5 , £ oma R CD o E / � 4E / ) \ - W ? C c e c o - o e 2 = » o o / / \ % > 0 o ƒ 0 A o o = o $ e \ > / .// 3 0 2 Z g 7 > 04 E \ R = 7C/ » % _. 2 » Ce « Q C"J : \ / / ("Ni / \ 6 720 \ t R A E. 2 / 2 3 2 / CU > < n G 0 ± c ± m ± / CD U 2g O E / E o - O o 2 t O Z m � 277Ec-0/ 48 \ O \ Qu $ / / ' % % k \ / / f $ / : ® 2 \ / a/ § /s ? ,\ t / R \ \ \ \ 9 = o as I o E o 2 * \ a 2 n / f 0 D / D \ D \ / a) / / CO > = r ® # a ' = ER/ \ OwOoo2 — a) Z D E o o — e W c 2 c ± — n # = g a 2 o nom ® G = _ 3 e o $ - m co m m e s @ a J o R & 2 Q O I ± I m * t < R < R < * O o O Z G — a r r r in dd \ \ W CO CO o CO 5 & & no & or \ \ \ \ E � � nnm = « 0 6 0 0 TREE= 4'CNV • VVELLHF_AD= WEVOY SA NOTES:WELL ANGLE>70'@ 9897' 'ACTUATOR= OTIS S®p 1 .# I U11AL KB,A F 66.38' BF.BEV= 37.81' KOP= 3004' 2181' H4-1/2"FES HXO SSSV NP,D=3.813" Max Angie= 102 @10054' Datum MD= 9790' Datum TVD= 8800'SS 2596' —9-5/8"DV FKR GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80 BUTT,ID=12.347" —j 2694' 6 3002 2999 10 WAG DOME RIC 16 10/18/11 I 5575 5042 47 M D DOME RK 16 10/18/11 95/8"X 7"TIEBACK LM,D=7.50" }— 5840' 1`II `4 7139 6381 2 KBG2-LS DMY BK 0 01/15/96 9-5/8"X 7"BKR LTP H 5848' '3 7820 7062 0 KBG2-LS DOME BK 16 10/18/11 w/HMC LAR HGR,D=6.187" '2 8542 7784 1 KBG2-LS SO BK 24 06/15/13 '1 9268 8475 36 KBG2-LS '"DMY BK 0 10/15/10 TOP OF CEMENT —{ 5986' *STA'S#1-#4=SPECIAL REDUCED CE)D=3.65" "STA#1=DMY BERM CT LINER MLLO(JT WINDOW(S-01B) 5995'-6045' 9-5/8"CSG,47#,L-80,D=8.681" — —6045 Minimum ID = 1.78" @ 9279' 9232' --14-1/2"BKR KBLN2TOP FKR D=2.37'(03/20/11) MILLED OUT ALUMINUM BUSHING IN 9247' 12-7/8"OTIS X NP,D=2.313" DEPLOYMENT SLEEVE 9263' H 3.70"DEPLOY SLV,D=3.00" 9268' H 3-112'X 3"LNR XO,ID=2.70" 9269' —3"DE R.OY SLV,D=1.78' (ALUMINUM BUSHING @ 9279 MILLED OUT) 4-1/2"113G, 12.6#,L-80 BTC-MOD, H 9492' I— I 9492' H4-1/2"X 3-1/2"XO,D=2.992' .0152 bpf,D=3.958" 9503' -13-1/2"HES X NP,ID=2.750' 9517' —17"X 4-1/2"BKR S-3 PKR w /ANO-OR,D=3.00' 9521' H4-1/2"X 3-1/2"XO,D=2.992" 9542' H3-1/2"HES X NP,D=2.750" 9562' H3-1/2"I-ES XN NP M LLED TO 2.74"(02/06111) CEMENT(TAGGED 02/07/11) H 9560' , 3-1/2"TBG,9.3#,L-80 EUE8RD, —{ 9575' � 1 0087 bpf,D=2.992" • i 9574' —13-1/2"W/LEG,IS=2.992" • WhPSTOCK(03/04/11) 9784' iii t•1 9572' --I SMD TT LOGGE)06123!96 7'CSG,29#,L-80 BTC-M.0383 bpf,D=6.184" --I —9790 •'i ' C •• 3.80"MELOUT WIDOW(S-01C) 9786'-9790' ••••••••••• ••••• FERFCX?ATION SUMMARY ••••••••••• REF LOG:SLB PSP GAF?/CCUCBLNDL ON 03/17/11 • • ANGLE AT TOP PEW:99°@ 10290' Note:Refer to Production DB for historical perf data TOP OF CHINWENT LOGGED — 9870' PBTD 12089' SLE SWTERVAL Opn/Sqz SHOT SOZ 1.56" 6 10290-10710 0 03/18/11 1.56' 6 11450-12030 0 03/18/11 1.56' 6 12060-12083 0 03/18/11 '•41,1".., 2-3/8"LNC,4.6#,L-80 STI_,.0039 bpf,ID=1.992" 12129' DATE REV BY C OtvtvL.NTS DATE REV BY COMMENTS FRU[.7HOE BAY UNT r 1982 ORIGINAL COMPLETION 01/17/13 TJH/JMD GLV CIO(01/07/13) WELL S-01C 01/17/96 N28E SIDETRACK(S-01 B) 04/09/13 JMIJMD GLV 00(03/30/13) PERMIT No:"2101440 03/21/11 NORDIC CTD SIDETRACK(S-01C) 06/18/13 MEMY PJC GLV C/O(06/15/13) API No: 50-029-20717-03 04/04/11 PJC DRLG DRAFT CORRECTIONS SEC 35,T12F'1 R12E,1692'FM..&767'FWL 05/02/11 NK/PJC FINAL DRLG CORRECTIONS 11/12/11 SWC/PJC GLV 00(10/18/11) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. al 0 - _I 14. 14 Well History File Identifier Organizing (done) ❑ Two-sided I I I1111111111 ❑ Rescan Needed III IIIII II II I I III RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ Maps: 2Greyscale Items: Other, No/Type: .. NO, 1 ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Mal Date: e /s/ alP Project Proofing I I liii BY: CTAaria) Date: '$ /s/ Me Scanning Preparation ca,. x 30 = it -+ Lt. = TOTAL PAGES ‘9 Li- (Count does not include cover sheet) pi BY: Date: ji � /s/ !I Production Scanning 111111E1M Stage 1 Page Count from Scanned File: W JS (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES NO r� - BY: - Date: I L I$ 14 1s1 V Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I ReScanned 1111111110 I I BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111 III III 19/99/9011 Wall I-licfnni Filch r,,,, r Pnnch fin, o "e" o o d cn 9 2 J J cZo N.. O 0 L �) O c 7 a E d m 0 0 a-o o a m a) o Z 0 a a 0 m 2 W 0 o o) U o 0 0 �g t C7�` �v ec c - c co M a Q mU en 0 u) Ca m ocL d v) u) aU 0 ec L dv o a N co O Z U °o O m J m J o a Q J N E 0) Z 7 o co Co Up Up 2 d p o 0 20 to a)0 a U c 0) 0) 2> 2> 0ce 0 2 1- 2 2 00 00.. Q ii o v m 0 0 >>Ir � r r d a) 0 0 0 0 0 0 0 0 0 J Cl) d N N N N N N N N N N N 0 0) N 1.0 •� N O O O O O 1� O Q O N N N Z J M M N N co Cr tD (D Co N S E c — d --....e 2 = = a) a) N N a) Cl) N Cl) a) N N E N pU 0 0 U 0 0 0 0 0 0 0 0 o I' Q U Y U [L c O co co (O (D CO CO CO CO 0 O ,_Q V _V 8 O v _ v _ _ O v 0 d aO Z j U f co N 1- C I N C N N N O E v) d 1 W g a) v) Z 0 C O O M M N CO N CO N Oo O O O ce J . O 00 O O V• N- n I"- IC IC N a (/) 0) 0) 0) 0) 0) 0) 0) Cr) 0) 0) W w d J o m O I Z _ " .O+ O O CL tO Q to �' Z u, 'II 7 J 0' m I to p CO 0)y o 0 0 0 5 c a c ZI J 2 0 U U U U u)C O o a) U) m tr) to O N E 11 J N N N (l) N N to 1 J U o 11 1 a N I 0 � Z O I I I U 5 N 0 m Q NII m M 0 CC - O a) (n w Q a 0i I 0 a I of . Q o a) a Q d U j o Z Z N N N .N E 7 U Cl)( Cl) N N N -CC Ca I 2 0 0 CC Q6 N Q 0 m m m c c C 0 o O as al ,O y N O O c c C • to I E a) a) Cl) O - Z N Cl) O a) .D 'O V CO CO 'O E O CO a b p U 0 c c c Ur 0 c 0 R O) O Q ; Z 0 N d N- O CO CO e j 0 ` a N E o) N (O O r- c ~ N N to 7 0 N C p .0 O W O Z d I' N R 1 1- L. 0. a)0 LL' Q O E ' M ' Z V L i re . l 0 Cl) N to co En— Q J N Z C , Y p O W J d \..) U �U \ \ .1 U . ct I ? E 1 5 Q W pJ J J a 5 0 J T CL WW J W W W W L - F 0 o co 0 T n Z `. 0 N � J V [ o I H! o N1 N Z if E.Q JI Hli J O O z L. = j y co lis- co N� J 0 Q C N O z O LL J a W X 0 w J U m o 0 d 7 a o o _ .1 a T € N c m o 1 r g O Li_ o a, 1 O et E V 0 I J 0 11 1 Q o it I— N H ~ 5 o G N CO Q CO N M V+ 0 p Q a o Tx r Q a z 0 13 v I co Z I d 0 rn op 1 Z O ° Q; 1 1 I o r >- I 3 d N Z v 1 ix c " J �,, > I w c Z a) o - c c • D co P 0 a T• E I a a Q 0 Q w 0 Ci Pecs C-01 e_ Regg, James B (DOA) P �°I�'� From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator @l1p.com] Sent: Monday, June 17, 2013 7:39 AM el( 6 I'?!(3 To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Regg, James B (DOA); Schwartz, Guy L (DOA); Weiss, Troy D; Glasheen, Brian P; AK, OPS WELL PAD S Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: OPERABLE: Producer S-01C (PTD#2101440) Passing TIFL All, ✓ Producer S-01C (PTD#2101440) has had a passing TIFL performed post OGLV change-out, demonstrating two competent bapigrs. At this time the well has been reclassified as Operable, and may remain online. - Thank you, Laurie Climer L-1/tc nurc JLrcA Dish, 'n BP Alaska - Well Integrity Coordinator L C rc�s r. n WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator @BP.com From: AK, D&C Well Integrity Coordinator Sent: Thursday, June 13, 2013 10:14 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; 'jim.regg @alaska.gov'; 'Schwartz, Guy L (DOA)'; Weiss, Troy D; Glasheen, Brian P; AK, OPS WELL PAD S Cc: 'AK, D&C DHD Well Integrity Engineer'; AK, D&C Projects Well Inte• ity Engineer; Climer, Laurie A Subject: UNDER EVALUATION: Producer S-01C (PTD# 2101440) fai -d TIFL All, Producer S-01C (PTD#2101440) was shut in during a plant sh 4 down and exhibited TxIA communication. A subsequent TIFL performed once well was brought back online failed o, 06/13/13.The well has been reclassified as Under Evaluation for further diagnostics Plan Forward: 1. Slickline: change out orifice gas lift valve 2. DHD: Re-TIFL well Copies of the wellbore schematic and TIO plc/have been included for reference. Please call with any questions. 1 P64_ c 210 )44-o Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator @bp.com] 2Za1 61141 13 Sent: Thursday, June 13, 2013 10:14 PM l` To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Regg, James B (DOA); Schwartz, Guy L (DOA); Weiss, Troy D; Glasheen, Brian P; AK, OPS WELL PAD S Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: UNDER EVALUATION: Producer S-01C (PTD#2101440) failed TIFL Attachments: S-01C Wellbore Schematic.pdf; S-01C TIO 6-13-2013.docx All, Producer S-01C (PTD#2101440) was shut in during a plant shut down and exhibited TxIA communication.A subsequent TIFL performed once well was brought back online failed on 06/13/13.The well has been reclassified as Under Evaluation for further diagnostics Plan Forward: 1. Slickline: change out orifice gas lift valve 2. DHD: Re-TIFL well Copies of the wellbore schematic and TIO plot have been included for reference. Please call with any questions. Regards, Laurie Climer (Alternate.Jael, 1.)ishrai) BP Alaska - Well Integrity Coordinator rzuw WIC Office: 907.659.5102 WIC Email: AKDCWelIIntegrityCoordinator @BP.com 1 TREE= 4"CIVV VELLHEAD= NbEVOY SAFETY NOTES:WELL ANGLE>70°@ 9897' ACTUATOR= OTIS S"10 I C INITIAL KB ELE 66.38' BY.ELEV= 37.81' KOP= 3004' Ntax ' 1 2181' --I4-1/2"FES HXO SSSV NIP,ID=3.813' Angle= 102°a 10054 0 1 Datum MD= 9790 — MHO. . Datum TVD= 8800'SS — —,— 2596' -9-5/8-DV FKR GAS LET MA.ICRELS a ST NU 1VD DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,L-80 BUTT,ID=12.347" H 2694' -41 a, 6 3002 2999 10 T NAVIG DOME RK 16 10/18/11 5 5575 5042 47 MtvIG DOtvE RK 16 10/18/11 9-5/8"X 7"TIEBACK LMT,D=7.50" -I 5840' ( '4 7139 6381 2 KBG2-LS [MY BK 0 01/15/96 *3 7820 7062 0 KBG2-LS COME BK 16 10/18/11 9-5/8"X 7"BKR LW --1 5848' w i tiVC UR HGR ID=6.187" i r *2 8542 7784 1 KBG2-LS SO BK 24 03/30/13 '1 9268 8475 36 KBG2-LS *DMY BK 0 10/15/10 TOP OF CENENT - 5986' *GL NB#1-#4-.SEECIAL REDUCED ID=3.65" 9-5/8"CSG,47#,L-80,ID=8.681" H -6045 i **GEM#1 =DMY BEHIND CT LINER MLLOUT WINEDW(S-01B) 5995-6045' Minimum ID = 1.78" @ 9279' 9232' -14-1/2"BKR KB LNR TOP 2.3r(03/20/11) MILLED OUT ALUMINUM BUSHING IN 9247' H2-7/8"ails X NIP,ID=2.313" -:....... ....:_-.1 DEPLOYMENT SLEEVE i 9263' H3.70-DEPLOY SLV,ID=3.00" no■rm 9268' —3-1/T X 3*LNR X0,0=2.70" 1 9269' —3"DEPLOY SLV,0=1.78" 1/ G,12.6#,L-80 BTC- 0D, H 9492' I (ALUMINUM BUSHING @ 9279 M IL LED 0151) 9492' —4-12 X 3-1/2"XO,ID=2.992" .0152 bpf,D=3.958" 9503' -13-112"FES X NP,ID=2,750" I c 9517' H7"X 4-1/2"BKR S-3 F'KR w /ANCHOR,0=3.00" --------- 9521' -4-1/2"X 3-1/2"XO,D=2092" 9542' -3-1/2"FES X NP,D,-2.750" 9562' -13-1/T 1ES XN NIP MLLED TO 2.74"(02/06/11) CEIVENT(TAGGED 02/07/11) -I 9560' ■ j 3-112'113G,9.3#,L-80 BJE 8RD, - 9575' t § 0 9574' H3-112'WILES,IS=2.992" .0087 bpf,0=2.992" ■ P , ■ 9572' T-IELMD IT LOGGED 06/23/96 WFWSTOCK(03/04/11) ---I 9784 " ' •-• "■•...4 17"CSG,29#,L-80 Fyrc-m,.0383 bpf,ID=6.184" - -9790 ■■•, PERFORATION 3.80"WILLOUT WtDOW(S-01C) 9785-9790' ••■11,■11' • • 4 . •• • • SUMMARY • • • AO A.A. ■7 11741r • 4111111111%p REF LOG:SLB PSPGR/OCL/CBUVDL ON 03/17/11 ANGLE AT TOP FERE:99°@ 10290' 411141414, PBTD 12089' Note:Refer to Production DB for historical per'!data TOP OF CENAENT LOGGED -1 9870' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1111%klw 1.56" 6 10290-10710 0 03/18/11 1.56" 6 11450-12030 0 03/18/11 1,56" 6 12060- 12083 0 03/18/11 •47.4011,,, 2-3/8"U4R,4.6#,L-80 STL,.0039 bpf,U=1.992' - 12129' ] .0 DATE REV BY COMMENTS DAM , REV BY COMRENTS PRUCHOE BAY UNT 1982 ORIGINAL COMPLETION 01/17/13 TJFI/JAU GLV C/O(01/07/13) , WELL S-01C 01/17/96 N28E SIDETRACK(S-01B) 04/09/13 JMQN/D GLV C/O(03/30/13) PERMIT No:it101440 03/21/11 NORDIC 2 CTD SIDETRACK(S-01C) API No: 50-029-20717-03 04/04/11 PJC DREG DRAFT CORRECTIONS SEC 35,T12N,R12E, 1692'FNE&767'EVA. 05/02/11 M</PJC FINAL DRLG CORRECTIONS 11/12/11 SVvr./PJC GLV C/O(10/18/11) F3P Exploration(Alaska) ■ s8g i& +I 1 _A , ,‘,, 11.1 aM __,. ,-,- ..,.. . ,., Nor s i umillir _= 5 N .n r • • a .a I E E i LI O 0 a U , 3y N r O M $ r s cn p o a y co H 0 ' a 0_ o I= RECEIVED . STATE OF ALASKA MAR 0 2013 k JKA OIL AND GAS CONSERVATION COMM._ .,ION REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well Lf Plug Perforations U Perforate U Other 11 Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other 0 Re-enter Suspended WeII❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ ' 210-144-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20717-03-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028258 .,' PBU S-01C 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 12413 feet Plugs measured None feet true vertical 8904.67 feet Junk measured None feet Effective Depth measured 12089 feet Packer measured See Attachment feet true vertical 8893.74 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 28-108 28-108 0 0 Surface 2667 13-3/8"72#L-80 27-2694 27-2693.41 4930 2670 Intermediate None None None None None None Production 6019 9-5/8"47#L-80 26-6045 26-5363.6 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10290-10710 feet 11450-12030 feet 12060-12083 feet True Vertical depth 8901.39-8886.85 feet 8922.92-8897.4 feet 8895.39-8894 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 10290'-10710', 11450'-12030', 12060'-12083' Treatment descriptions including volumes used and final pressure: 435BBL 3%NH4CL, 182BBL 12%HCL,24BBL 2%KCUOIL SEEKER&BEADS, 189BBL MUD ACID 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 459 260 363 1375 247 Subsequent to operation: 684 330 738 1877 379 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratori❑ Development EI - Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil— 0 Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s• b..com Printed Name Nita Summerhays / Title Pterotechnical Data Technician Si.1 �� �? ��A��/ Phone 564-4035 Date 3/5/2013 RBDMS MAR 08 - 041, 1/1-F 41 I -115 Form 10-404 Revised 10/2012 4"//c/ Submit Original Only Daily Report of Well Operations ADL0028258 ACTIVITYDATE • ' es Ini ,'. on inue rom -:- 3 WSR*** In -0 , •u e - •. on inue Assisting CTU, Coil pumping down hole. Well barriers: Inlet primary barrier-Inlet block valve, Secondary inlet barrier-Inlet Safety valve on unit, Outlet Primary Barrier SSV, Secondary Outlet Barrier-Swab &AL Barriers:Primaty barrier-Lateral, Secondary Barrier-Casing valve 2/9/2013 ***Continue on 2-10-13 WSR *** 2/9/2013 ***WSR continued from 2-8-13*** Contiue to heat upright tanks. CTU 8 w/ 1.5" CT. Scope;Acid Stim. **Continued from WSR 02-08-13** Off weather standby @ Midnight. SWS adding inhib to acid, LRS heating NH4CI water on location. Prep for acid job. RIH to 12072 tag, PUH gait flag 10ft off bottom. PUH to LTP. Pre job safety with SLB pumpers on acid hazards &acid pump schedule. pump Acid Stim job. Had 400 psi WH press increase w/1st diverter stg. Continue pumping over flush stage#2. 2/9/2013 «<JOB IN PROGRESS>>> ASRC Test Unit#4. ***Continue from 2-9-13 WSR*** Inlet S-01, Outlet S-19. Continue Assisting CTU, Coil pumping down hole, CTU RDMO, S/B DOS, POP S-01. Well barriers: Inlet primary barrier-Inlet block valve, Secondary inlet barrier-Inlet Safety valve on unit, Outlet Primary Barrier SSV, Secondary Outlet Barrier-Swab&AL Barriers:Primaty barrier- 2/10/2013 Lateral, Secondary Barrier- Casing valve ***Continue on 2-11-13 WSR *** CTU 8 w/ 1.5" CT. Scope;Acid Stim. **Continued from WSR 02-09-13** Cont w/Mud acid job &wax bead diverters. Waxed off perfs on 2nd diverter stg. FP'd CT and reestablished injection as wax melted. Cont. w/remaining acid job stgs. Freeze protect ct. Do injectivety test with diesel 4 BPM, W.H. 261 psi good injectivety. POP off well. Well secured, perform chain inspection and change packoffs. Well turned over to ASRC for flow back. Rig down move off location to shop for scheduled maint. 2/10/2013 <<JOB COMPLETE>>> FLUIDS PUMPED BBLS 127 60/40 METH 435 3%NH4CL 172 DIESEL 182 12% HCL 24 2% KCL/OIL SEEKER&BEADS 189 MUD ACID 1129 TOTAL 1 • co O03 000r°,) co N � CC) N- O � � CDCnO C N ti co cio V c N- co O ) 'O CO co co f� O v- CD to OO) NO � MNr• OCnMMM000O CD CD M C CO CO CD CO N- CO CO N 00 CO co f. M Co cof— O06 N N N N N N st CO O CO 00 O O N Cn c) N ct O O) Oa N- N O CD d' UC) .= O) CD N O) O) In 2 N CO aoTrcc'oocor- u, co ) N N to N CV N N O ▪ J Ooo ° O co co - 0 J J lB CO N CAD .N N X •:t' _ N O N V - - 00 �N O N ao M N N Cv ) M .0 lU) C D O v- CO CO N C CO 0) 00 0 CO 'V CO 0) M N CD N O) z O 0 Coack au, zz vzwwOamm OzzCLDDD U7 acn ►- f- Packers and SSV's Attachment ADL0028258 SW Name Type MD TVD Depscription S-01 C PACKER 5848 _ 515715 7" Baker ZXP Top Packer S-01C PACKER 9232 _ 8374.88 4-1/2" Baker KB LT Packer S-01C PACKER 9517 8596.33 3-1/2" Baker SABL-3 Permanent PC III ThEt_• 4'CAN SAFETY NOTES:WELL ANGLE>70°@ 9897' WEWLEAD= McEVOY S mO 1 C ACTUATOR= OTIS KB.REV= 66.38'' BF.ELEV= 37.81' KOP= 3004' 2181' 1-14-1/2"FES I DCO SSSV Imo,D=3.813" Max Angle= 102"@ 10054' Datum M3= 9790' _ 2696' 9-58'OV R<R Datum TVD= 8800'SS GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/T CSG,72#,L-80 BUTT,D=12.347' 11-1-694' 1--44 6 3002 2999 10 MG DOME RK 16 10/18/11 9-5/T X 7"TACK LN2,D=7.50" —1 5840' I ����IIII LI 5 5575 5042 47 MMG DOME RK 16 10/18/11 '4 7139 6381 2 KBG2-LS DMY BK 0 01/15/96 9-5/8"X 7"BKR LIP —1 5848' 1 '3 7820 7062 0 KBG2-LS DOME BK 16 10/18/11 w/HNC LNR HGR,D=6.187" "2 8542 7784 1 KBG2-LS SO BK 20 01/07/13 TOP OFCEMBIT --I 5986' , '1 9268 8475 36 KBG2-LS **LIMY BK 0 10/15/10 "GLMS#1-#4=SPECIAL I)UCDD=3.65" "GLM#1=MY BU DD CT LINER MLLOUT WINDOW(S-01 B) 5995'-6045' I 9-5/8"CSG,47#,L-80,13=8.681' --I —6045 Minimum ID =1.78" @ 9279' n 9232' IH4-1/2"BKR KB LNR TOP FKR,D=2.37'(03/20/11) MILLED OUT ALUMINUM BUSHING IN 9247' H2-7/8"OTISX MP,D=2.313" D_ EPLOYMENT SLEEVE 9263' —13.70"DEPLOY SLV,D=3.00" rw 9268' H3-1/2"3-1/2"X 3"LNR XO,13=2.70" I ----■ 9269' I 3"DEPLOY SLV,D=1.78" (ALUMINUM BUSIUNG 6 9279 MILLED OUT) 4-1/T TBG,12.6#,L-80 BTC-MOD, —1 9492' J— i L 9492' H4-1/2"X 3-1/2"X0,13=2.992" I .0152 bpf,D=3.958" ' 9503' H3-1/2"HES X NP,D=2.750" I I 951r 1-17"X 4-1/2"BKR S-3 PKR w /ANCHOR,D=3.00" �---------I 9521' 1-14-1/2"x 3-1/2"xo,D=2.992" ' 9542' H 3-1/2"HES X NP,D=2.750" I 9562' —I3-1/T I-ES XN NP MIL®TO 2.74"(02/06/11) I CBENT(TAGGED 02/07/11) —1 9560' I 4 • 3.1/2"TBG,9.3#,L-80 BJE8RD, —1 9575' J 0087 bpf,D=2.992" • 9574' H3-1/2"W/LEG,IS=2.992" W-FSTOCK(03/04/1 1) 9784' ••'• i'i 9672' TT LOGGED 06/23/96 .�.J AA 7"CSG,29#,L-80 BTC-M,.0383 bpf,D=6.184" —1 —9790 4� ,•4` 3.80"MLLOUT WINDOW(S 01C) 9786'-9790' PERFORATION SUMMARY ♦•w'•w•••• REF LOG:SIB PSP GR/CCUCBW DL ON 03/17/11 •�•�•�•�•�•4 ANGLE AT TOP PERF:99°@ 10290' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz DATE TOP OF CBNBNIT LOGGED --I 9870' I �� 1��• 1.56" 6 10290-10710 0 03/18/11 1.56" 6 11450-12030 0 03/18/11 1.56' 6 12060-12083 O 03/18/11 • ' , 2-3/8"LNR,4.6#,L-80 STL,.0039 bpf,13=1.99T —1 12129' 4. DATE REV BY COMMENTS DATE REV BY COMIBNITS PRUDHOE BAY tNT r 1982 ORIGINAL COMPLETION 01/17/13 TJWJMD GLV C/O(01/07/13) WELL S-01C 01/17/96 N28E SIDETRACKS-01B) FE4'2MIT No:'101440 03/21/11 NORDIC 2 CTD SIDETRACK(S•01C) AR No: 50-029-20717-03 04/04/11 PJC DRLG DRAFT CORRECTIONS SEC 35,T12N,R12E,1692'FM..&767'F VVL 05/02/11 MK/PJC FINAL DRLG CORRECTIONS 11/12/11 SWC' PJC GLV C/O(10/18/11) BP Exploration(Alaska) ev A e E E 0 o ° . §V5g , §3 ƒg q ;G !< % ;__■f 0° I .m't X70; 2 0 = 7 En % 2 u i�� 3 . and§2k j\\ r -' ° \ } _< a \ ID » co 2P ( , \ 2k ` C c % © es - \ p £ a Jq< A itti\ — ~ � :i::::: � { _== Q __ter gg 0 \\U\- \\/\� l- c 7 u o j. - § § 0 U. 0 W I- X 0 $-1§Z -I 2 E b 2 < b z �z 0-§§ §B§ § ■g »o» *mg - e mi=ce mm2Mwaewkw k 0./0 7;=0.0/ 1 2 , §a_©0 U)0 0 k i §§§%§§&)n) & ® @§z§§_1-,s23 E 7 _.f__mm_m. q a © ' § f142 §k ® Sa! gas �k� \ r $$§§OR��\2 04- MIa2\{ ;sOsk3E2§ . b)) & RI II < ar _ mwmZ V) w2'51' < m<4 �§!) RECEIVED STATE OF ALASKA AL ._,KA OIL AND GAS CONSERVATION COMM__ION SEP 18 2012 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair WeilU Plug Perforations U Perforate U Other[] Performed: Alter Casing ❑ Pull Tubing❑ timulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ timulate-Other El Re-enter Suspended Wee 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 210-144-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20717-03-00 7.Property Designation(Lease Number): — 5`'!'1 8.Well Name and Number: _ ADL0028258 A8,3f 7 C PBU S-01C 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured 12413 feet Plugs measured None feet true vertical 8904.67 feet Junk measured None feet Effective Depth measured 12089 feet Packer measured See Attachment feet true vertical 8893.74 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor None None None None None None Surface 2665 13-3/8"72#L-80 32-2697 32-2696.4 4930 2670 Intermediate None None None None None None Production 10070 9-5/8"47#L-80 28-10098 28-8930.63 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10290-10710 feet 11450-12030 feet 12060-12083 feet True Vertical depth 8901.39-8886.85 feet 8922.92-8897.4 feet 8895.39-8894 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): 10290'-10710',11450'-12030', 12060'-12083' - Treatment descriptions including volumes used and final pressure: 102 Bbls 12%HCL,92 Bbls 9:1 Mud Acid 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 415 23 203 910 211 Subsequent to operation: 967 870 511 1973 304 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratort❑ Development ][ - Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil.. Q Gas ❑ WDSPtU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564-4424 Printed Name Garry Catron Title PDC PE 1 Signature $44L4 e,47 ._..„. Phone 564-4424 Date 9/18/2012 .. 7‘. 7,z_s---.1 -L_- ReDMS SEP 2 0 2li - i- iq4 - Form 10-404 Revised 11/2011 Submit Original Only a) Y U co a c a) c C O i c aY a`) a adch 1 . a_1 0I- a acn -;Les m f0 .w Y W m (V E f-. M V CU U Q CO ov-� in Pi g `r) °° cn G -a a C CIS N v g ago ) � rn as a re re c.YY 'Q ¢ as a) zoo cn cn co w 0.oc0002 0 N (0I) 0 C , N 0 ECOOOON. (in (oo) (0 7V- , C00) NI- c, co co , CONI- cO � — IC) M (O v) 0) N CO v M NI- NMO (0 (0 cci NOCe) ONto 0000) O (ON (soco coNcoc0 C N- N- CO O) f- (Y) e-- O CO N O Cp N N M M mt N Nt CO IA CO CO vla C CD TrNNIsNg O O CC". LC) Nx- % N 0) 0) CI) co ID N CO •1 co CO NO ON) CO N CO CV N CY) (v Nr C Q J Q O 0 0 8 o o0° COCD Jao C O J J �J} d J t l N 2 A C.) RS N N. , 0) I- M 9 M N ,- i r N O 4 C7 4 O) CDC/ LON 0)0 (0 O (OCON C (Y) CO CO Cr CO J v- N cO N 0) Z _0 ai C P W C U Wr0! o � zz Vww0O: mm zzct » > J J Q. fn F- H ID N N C M Q 0 a) CV c > > a) 0 EID C °)m •-p — a 3 3 C eL Ur O -L Q N O 06 Ti) ,O n sQ jL LL N LL * 0 o X > a E O a) E C a) O O O O a0 O • U (0 . a Q 2 3 O j i) • r r r r (V a) > (/) 0 U) E > U C O c Q_� Y N (A cA (n > (n 1- > a) a)) -U .p rn j >a) • o - 0 C 92 z 0) N ) N C )- o > > cola t CD C° cL > jl CO - E a) 'C_ > > 0 CO> C N Q r * 3 \ O N Y ' a) j E E a) )' N = 4-. U) E m n 7 's - C L N 10 o as C ,- O p 0 CO O U a) o - 0 0 r Qch o_�_ o aa) Oo Oo m O O O ,O O N 0 0 O (X O 3 N ' C -I Y r N r . 0 r CD Q- U i U O .O J O O O * O O • 0 U) U) 'U o _L a) Or (n J < N z N -_ .- U) Cl) -" C c N ° v N II N c Q OC a) N E u) 'E N- - - . - c C cn > > -0 2 ,— Em -0 (n C LO U c N >a) a) "0 a) o • E E cn O O j +. a) Q (n O MS a) «. + Q �, * O O LL a) U E 06 0 0 N ra (/) a) a) * N O N (A • C C N C 7 o C U O O co 7,-., a) 2 Q' C > E (Ni C C cn C 0 . U _O * * C U * M ` N M a) 7 u) -0 C * - * * p ++ Q U N N Q C m _0 N E N O r N E 0 0 a) 0 �I N N N L 2 • > r0 Y r0 N p E c O= 0 a. M r r Q) r CD Q Q. m' d r N O M O C 0) 0 r OU `' " ' O\ n N f.1.? N LO N. ° * r ° II N Q) C C c (O I� Q 00 O t/1 y co w oo * oa 0 S co E * - °. r O .p O (0 N O N > N O N O • O to O * I I U ^ CO () CO C co o0 II a) op co csi cm ci) (>n ° U �) (>nao 11 1 u. E mo EO U) * u) a) (1) a u)) _0 Q C i 7 > a Y a) 3 a) > N II m = * = O u) a) cV 6 > C > LL O E >' o f E .o z co (a w ~ E `O c°V O o c m E c E E. E t E ate) a) m Qo o � _ ao * o c � 0 moo ° m a o 203 o -t • V7 Q M U 3 * . v E .� — U c w- > Q Q • O O co O 'a Q . LL (� ,_ _ F- t 0 -'CD 0 O 0 * = 0 M 0 C C II a) p C , O L O a) C U C C C C Q a3 C . c ° ° a) U)) L C 0 - .1- a) uc°i '`� a�i i I c c c Y A E u) aa) 0 0 aa) N ,- �0 c > 0 — 0 c0 o H ca c a 0 o a-. o c o c o c U 0 ` >,. .CD Q p :.) cn � 0 .1.=. 0 ` U o U 0a3 U co ,� ° o -0 cn 0 — * U- m ° = Q c a) r- * * • * H * • CI (.0 o - m = -oa a) * C E - O ID £ °— * a * o * 0 * o 3 N +. L M 3 Q O co U a) ~ m e LU cn a E N N Q N cn N u) N v)67 * .. Cr) a) C C r fn c C m U a) Q CO L G p E C E U 7 'E C 7 a = (j * c E > LLI a) Q m a) a) - a) OD � ink ink � _ _I cCO01 ) * .c0- ca Md Ew in i) cn � cn � .. mQ m — a) -- SOU CV CO ma ai p ^ i0 o c E 3 0 >o a) a 0 a II ui F- tY H m r 11J O `- fA - O U O (-) - C a) O U H U H O I l a a) U c U c i i 2 2 11 I I a) Q -0 0 0 0 m (n °O> •p `a m ►�. Q Q_Ta• 2> mc � cr _a, OwzO (nm � � Lw> Eccn m � � � � w — -. � � LLLL o < m < QD—o H aa) Q2v) * c8od ° * -> o -0 ,- O Q5 CO < Qm LU H 0 N N_ N N N N N N N N N N r r r r r r r r r r N- ). O O O O O O O CD O O O O N N N N N N N N N N N N r N M LC) U) U� t1') O N- co 0) N N N N N N N N N N N N 0 co co co co co co oo co a0 a) a0 a0 Q E a) a oi ti) O a) a� CO c N O * a.) L o Q co . O c CD CD O Cl) O J oO U) 't o O Q z o c re oa= >+ U N 0 a) E 0 D a)• v- F- N UN I- '/IC L (CC < o N O M CO TREE= 4"CNV o 1 WELLHEAD= McEVOY SAFE. , NOTES:WELL ANGLE>70°@ 9897' ACTUATOR= OTIS KB.ELEV= 66.38' BF.ELEV= 37.81' KOP= 3004' 2181 1-1±1-1/2"HES HXO SSSV NIP, ID=3.813" Max Angle=102°@ 10054' Datum MD= 9790' 2596' H9-5/8"DV PKR I Datum TVD= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,72#,L-80 BUTT, ID=12.347" H 2694' 6 3002 2999 10 MMG DOME RK 16 10/18/11 9-5/8"X 7"TIEBACK LNR,ID=7.50" -1 5840' I I i4 5 5575 5042 47 MMG DOME RK 16 10/18/11 *4 7139 6381 2 KBG2-LS DMY BK 0 01/15/96 9-5/8"X 7"BKR LTP H 5848' I *3 7820 7062 0 KBG2-LS DOME BK 16 10/18/11 w/HMC LNR HGR,ID=6.187" *2 8542 7784 1 KBG2-LS SO BK 20 10/18/11 TOP OF CEMENT H 5986' I *1 9268 8475 36 KBG2-LS **DMY BK 0 10/15/10 9-5/8"CSG,47#, L-80,ID=8.681" -6045 GEMS#1 -#4=SPECIAL REDUCED ID=3.65" **GLM #1 =DMY BEHIND CT LINER MILLOUT WINDOW(S-01 B) 5995'-6045' , 9232' I-14-1/2"BKR KB LNR TOP PKR,ID=2.37"(03/20/11) Minimum ID = 1.78" @ 9279' 924T H2-7/8"OTIS X NIP, ID=2.313" I MILLED OUT ALUMINUM BUSHING IN " '_ DEPLOYMENT SLEEVE 9263' H3.70"DEPLOY SLV, ID=3.00" I -r-� 9268' 1-13-1/2"X 3"LNR XO, ID=2.70" I 9269' I-3"DEPLOY SLV,ID=1.78" (ALUMINUM BUSHING @ 9279 MILLED OUT) 4-1/2"TBG, 12.6#,L-80 BTC-MOD, - 9492' I- 9492' I-14-1/2"X 3-1/2"XO, ID=2.992" I .0152 bpf, ID=3.958" 9503' H3-1/2"HES X NIP, ID=2.750" I 951 T H7"X 4-1/2"BKR S-3 PKR w /ANCHOR, ID=3.00" 9521' 1-14-1/2"X 3-1/2"XO, ID=2.992" I 9542' H3-1/2"HES X NIP, ID=2.750" I 9562' 1-13-1/2"HES XN NIP MILLED TO 2.74"(02/06/11) I CEMENT(TAGGED 02/07/11) H 9560' 4 3-1/2"TBG,9.3#,L-80 EUE 8RD, H 9575' ■ 4 .0087 bpf, ID=2.992" 4 9574' I-13-1/2"W/LEG,IS=2.992" I ♦♦• •♦♦i 9572' J-{ELMD TT LOGGED 06/23/96 J WHIPSTOCK(03/04/11) 9784' ♦♦j •♦♦j 7"CSG,29#,L-80 BTC-M, .0383 bpf, ID=6.184" -1 -9790 •4.1` 3.80"MILLOUT WINDOW(S-01 C) 9786'-9790' ■PERFORATION SUMMARY ♦♦♦♦♦4 REF LOG:SLB PSP GR/CCL/CBE/V DL ON 03/17/11 •••.•••..•.•••4♦♦♦♦♦, ANGLE AT TOP PERF:99°@ 10290' Note:Refer to Production DB for historical perf data PBTD 12089' SIZE SPF INTERVAL Opn/Sqz DATE TOP OF CEMENT LOGGED -{ 9870' I 1111111111%44444.4 1.56" 6 10290-10710 0 03/18/11 1.56" 6 11450-12030 0 03/18/11 1.56" 6 12060- 12083 0 03/18/11 2-3/8"LNR,4.6#,L-80 STL, .0039 bpf, ID=1.992" -1 12129' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 1982 ORIGINAL COMPLETION WELL: S-01C 01/17/96 N28E SIDETRACK(S-01 B) PERMIT No: 2101440 03/21/11 NORDIC 2 CTD SIDETRACK(S-01 C) API No 50-029-20717-03 04/04/11 PJC DRLG DRAFT CORRECTIONS SEC 35,T12N, R12E, 1692'FNL&767'FWL 05/02/11 MK/PJC FINAL DRLG CORRECTIONS 11/12/11 SWC/PJC GLV C/O(10/18/11) BP Exploration(Alaska) S STATE OF ALASKA ALASKA OIL. __.D GAS CONSERVATION COMMISSI WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ® Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑Exploratory ❑GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions One ❑ Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 3/21/2011 210-144 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 3/6/2011 50-029-20717-03-00 4a. Location of Well(GovernmentatSection): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 3/14/2011 PBU S-01C 1629' FNL,4523'FEL, SEC. 35,T12N, R12E, UM 8. KB(ft above MSL): 70.26 15.Field/Pool(s): Top of Productive Horizon: 985'FNL, 1677'FEL, SEC. 34,T12N, R12E, UM GL(ft above MSL): 37.10 Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 222'FNL,4027'FEL, SEC. 34,T12N, R12E, UM 12089' 8894' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 618919 y- 5979854 Zone- ASP4 12413' 8905' ADL 028257&028258 TPI: x- 616475 y- 5980460 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 614112 y- 5981187 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) _ N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL 9785' 8866' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MO SETTING DEPTH TVO HOLE 1 AMOUNT CASING WT.PER FT. GRADE To BOTTOM TOP BOTTOM SIZE CEMENTING RECC$RD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu vds Concrete 13-3/8" 72# L-80 Surface 2694' Surface 2693' 17-1/2" 3720 cu ft Arctic Set II 9-5/8" 47# L-80 Surface 5995' Surface 5328' 12-1/4" 1558 cu ft Class'G'. 130 cu ft Arctic Set I 7" 29# L-80 5840' 9785' 5222' 8866' 8-1/2" 906 cu ft Class'G' 2-3/8" 4.6# L-80 9232' 12129' 8445' 8893' 3" 62 cu ft Class'G' l . 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number): 1.56"Gun Diameter,6 spf 4-1/2', 12.6#, L80 x 9492' MD TVD MD TVD 3-1/2",9.3#, L-80 9492'-9574' 9517'/8667' 10290'-10710' 8901'-8887' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11450'-12030' 8923'-8897' 12060'-12083' 8895'-8894' �:u!412y44. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protected w/42 Bbls of Diesel 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): April 5,2011 Gas Lift Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 4/5/2011 4 Test Period ♦ 409 434 34 96 1,059 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 250 1,440 24-Hour Rate ♦ 2,456 2,601 203 25.4° 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No 1 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RECEIVED RBDMS APR 21 2(111 2). t\PR 2 Q 411 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE it Original Only S. 3 '1( Mhska0+1&6"Cent"6a . nom 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? ❑Ye 1 No Permafrost Top If yes,list intervals and form_ ns tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit 9801' 8878' None 45SB 9820' 8891' 45SB(Invert) 10425' 8889' 45SB(Revert) 10719' 8887' 45SB(Invert) 12060' 8895' 45SB(Revert) 12202' 8896' Formation at Total Depth(Name): 45SB 12202' 8896' -'31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. �y t r�T Signed: Terrie Hubble ,LQ 1► I 1 . Title: Drilling Technologist Date: l PBU S-01 C 210-144 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Wilmer Hoffman, 564-4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only WELL: S-01 C Operations Summary Rai Page 1 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 02/28/11 18:00 0:00 MOVE RIG OFF WELL, WO DHD TO BLEED DOWN ANNULI AND FULLBORE TO FREEZE PROTECT FLOWLINE R&P'S TO MOVE A PILE OF A LOT OF SNOW TO THE MIDDLE OF THE PAD THAT WASN'T THERE AT CHANGE OUT AND THEN THEIR LOADER N A AND HAD LEAVE BEFORE THE PILE WAS MOVED ,._ 03/01/11 0:00 2:00 CONTINUE OPS FROM 2/28/2011 SEND RIG LOADER OVER TO MOVE PILE OF SNOW SO WE CAN MOVE THE RIG 03/01/11 2:00 2:30 PJSM TO MOVE RIG 03/01/11 2:30 3:40 MOVE RIG TO S-01C 03/01/11 3:40 4:00 PJSM TO SPOT RIG OVER WELL 03/01/11 4:00 4:30 SPOT RIG 03/01/11 4:30 12:00 LEVEL RIG AND START RIG UP CONTINUE RU, SPOT SUPPORT EQUIPMENT 03/01/11 12:00 16:30 TEST BOPE oaP 03/01/11 16:30 17:30 BOP TEST COMPLETED, PRESSURE TEST SWAB, MASTER&SSV TO REMOVE THREADED COMPANION FLANGE AND REPLACE WITH A BLIND F LANGE 03/01/11 17:30 21:00 SWAP OUT THREADED FLANGE FOR BLIND FLANGE ON TREE 03/01/11 21:00 21:30 FLANGES SWAPPED OUT, OPEN MASTER AND SWAB TO PT TREE 03/01/11 21:30 22:00 PERFORM RIG EVACUATION DRILL AUDIABLE ALARM IS STILL NOT LOUD ENOUGH FOR ALL TO HEAR AT DIFFERENT LOCATIONS ON THE RIG. LOOK AT ADDING EVAC ALRM IN DOG HOUSE TO THE GAI TRONICS 03/01/11 22:00 0:00 PU INJECTOR AND MU STUFFING BOX PREP TO PULL CT ACROSS 03/02/11 0:00 1:00 CONTINUE OPS FROM 3/1/2011 PULL TEST CT GRAPPLE AND REMOVE SHIPPING BAR AND CHAIN 03/02/11 1:00 1:55 PULL CT ACROSS TO INJECTOR 03/02/11 1:55 3:00 START DISPLACING COIL WITH 10 BBLS METH FOLLOWED BY 100 DEG FRESH WATER FOLLOWED BY KCL BIOZAN BRINE. 03/02/11 3:00 3:45 PJSM TO PU INJECTOR AND PT THE INNNER REEL VALVE AND PACK-OFF 03/02/11 3:45 4:15 PT INNER REEL VALVE AND PACK-OFF 03/02/11 4:15 4:45 PUMP SLACK MANAGEMENT 03/02/11 4:45 5:15 RIG UP PIPE CUTTER AND CUT PIPE TO FIND WIRE 03/02/11 5:15 8:30 FOUND WIRE AT ALMOST 1% SLACK, CUT AND SEAL WIRE AND TRY TO GET ANOTHER 100' OF SLACK PUMPED INTO REEL. PUMP AGAIN AND GET A TOTAL OF 259 FT OF SLACK INTO REEL. CUT BACK CT TO FIND CABLE, THEN TEST CABLE. 03/02/11 8:30 9:30 CHANGE OUT BLIND FLANGE ON WING VALVE SIDE. 03/02/11 9:30 10:30 PJSM THEN INSTALL CT CONNECTOR. PULL TEST TO 35K, GOOD. 03/02/11 10:30 12:30 BRING TWC LUBRICATOR TO RIG FLOOR. M/U TWC PULLING TOOL. M/U LUBRICATOR TO CT RISER AND PT 250/3500 PSI AND CHART, GOOD. PULL TWC. 03/02/11 12:30 12:50 OFFLOAD CUT CT AND TWC LUBRICATOR. 03/02/11 12:50 13:10 CONDUCT RIG EVACUATION EXERCISE. INFORM DSO AND SIMOPS PERSONNEL WORKING NEAR THE RIG. EVERYONE MUSTERS IN OFFICE TRAILER AND IS ACCOUNTED FOR IN 3 MIN. CONDUCT AAR. 03/02/11 13:10 15:20 OPEN WELL AND CONDUCT FLOW TEST WHILE BHI INSTALLS CABLE HEAD. INSTALL CABLE HEAD AND TEST, GOOD. PT CHECK VALVES IN UQC, GOOD. 03/02/11 15:20 15:40 PJSM FOR M/U BHA. 03/02/11 15:40 18:00 ATTEMPT TO M/U MILL TO MOTOR. CAN'T TORQUE MILL USING EITHER THE LITTLE JERKS OR THE CRUMMIES. BOTH THE LITTLE JERKS AND THE CRUMMIES JAWS ARE TOO WIDE TO GRIP THE SHANK OF THE MILL. SEND MILL AND MOTOR TO BTT SHOP IN DEADHORSE TO GET IT TORQUED TO SPEC. 03/02/11 18:00 18:30 CREW CHANGE AND WAITING ON MOTOR & MILL 03/02/11 18:30 18:45 MOTOR AND MILL ON LOCATION, PJSM WITH NIGHT CREW TO MU MILLING BHA 03/02/11 18:45 19:45 MU BHA , NEW HCC 2.74" D-331 GAUGED 2.74 GO 2.73 NO-GO 03/02/11 19:45 22:00 RIH 03/02/11 22:00 22:40 TIE IN AT 9450' WELL: S-01 C Operations Summary Rel Page 2 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/02/11 22:40 23:30 CORRECT DEPTH -15' RIH AT MIN RATE AD TAG TOC TAG TOC @ 9560.6', NICE PU AND OPEN EDC TO SWAP HOLE OVER AT HIGHER RATE HIGH PRESSURE WITH THIS FLUID 2.4 @ 4000 PSI 03/02/11 23:30 GOOD BIO BACK AT SURFACE, CLOSE EDC AND BLOW DOWN TT LINE 1.5 BPM @ 3150 PSI 1.5 TO 1.8K WOB 25 TO 28 FPH @ 20° ROHS STALLS; 9562', 9564' MIDNIGHT DEPTH AT 9569' 03/03/11 0:00 3:00 CONTINUE MILLING PILOT HOLE 1.5 BPM @__150 26-30 FPH MILLING W/2.5K WOB MILLING AT 20° ROHS 03/03/11 3:00 5:00 CONTINUE MILLING @ 30 FPH 1.6 BPM @ 3523 PSI WOB= 1.6 TO 2.2K 03/03/11 5:00 7:40 MILLING CMT @ 30-40 FPH 1.6 BPM @ 3300 PSI FS WOB= 0.8 TO 1.5K MILL TO 9738 FT. 03/03/11 7:40 8:30 WIPER TRIP BACK TO 9400 FT WITH OPEN EDC. PUMP 2.23 BPM @ 4000 PSI. HOLE IS CLEAN BOTH WAYS, NOTHING SEEN ON WIPER. 03/03/11 8:30 9:20 MILL FOR A SHORT TIME AT 9738 FT THEN PICK UP, WAIT FOR CLARIFICATION OF MILLING PARAMETERS FROM ODE. 03/03/11 9:20 10:00 MILL FROM 9738 FT. MAINTAIN 20R TF FOR THE LENGTH OF THE PILOT HOLE. 03/03/11 10:00 10:40 MILL CEMENT @ 15 FT/HR. DWOB= 1.31K, MOTOR WORK= 187 PSI. MILL TO 9745 FT. 03/03/11 10:40 11:00 MILL CEMENT @ 9 FT/HR. DWOB= 1.47K, MOTOR WORK=235 PSI. MILL TO 9752 FT. 03/03/11 11:00 11:50 MILL CEMENT @ 17 FT/HR. DWOB= 1.11K, MOTOR WORK= 169 PSI. MILL TO 9763 FT. 03/03/11 11:50 12:20 MILL CEMENT @ 14 FT/HR. DWOB=0.81K, MOTOR WORK= 148 PSI. MILL TO 9772 FT. 03/03/11 12:20 12:50 MILL CEMENT @ 20 FT/HR. DWOB= 1.35K, MOTOR WORK=210 PSI. MILL TO 9784 FT. 03/03/11 12:50 13:30 MILL CEMENT @ 23 FT/HR. DWOB = 1.20K, MOTOR WORK=287 PSI. MILL TO 9798 FT. 03/03/11 13:30 14:20 MILL CEMENT @ 25 FT/HR. DWOB = 1.30K, MOTOR WORK=276 PSI. MILL TO 9814 FT. 03/03/11 14:20 16:00 MILL CEMENT @ 25 FT/HR. DWOB = 1.00 K, MOTOR WORK=239 PSI. MILL TO 9835 FT. 03/03/11 16:00 17:00 WIPER TRIP AND TIE-IN LOG. BACKREAM TUBING TAIL AREA. FIRST PASS THROUGH HAS MOTOR WORK NEAR TUBING TAIL, IN BOTH DIRECTIONS AT 20R TF. 03/03/11 17:00 18:00 PULL BACK THROUGH TUBING TAIL AT 60 FT/HR AT 160L TF. 03/03/11 18:00 18:30 CREW CHANGE 03/03/11 18:30 19:00 CONTINUE REAMING TT AREA 03/03/11 19:00 19:30 GETTING -100PSI MOTOR WORK FROM 9580 TO 9584' DAY CREW WAS SEEING MOTOR WORK AT 9573'WHILE REAMING HOLE PU AND REPEAT PASS DOWN, THIS COULD BE THE CASING CONTACT POINT AND THE MOTOR IS GETTING IN A LITTLE BIND FOLLOWING THE CASING DOWN 03/03/11 19:30 19:45 STILL SEEING MOTOR WORK, DON'T KNOW IF ITS METAL OR CEMENT. 19:40 PU TO 9450'AND SET UP MWD TO LOG CCL DOWN FROM X-O TO -y100' PAST TUBING TAIL 03/03/11 19:45 21:00 LOG CCL FROM 9450' TO 9580' STILL SEEING MOTOR WORK TO 9584' 19:50 CCL COMPLETED, WE ARE OUTSIDE THE TT AND THIS IS THE DIRECTIONAL CHANGE FROM CASING CONTACT WITH THE MILL. ROLL TF TO 160°AS PER WELL PLAN AND TRY TO KNOCK THE HUMP DOWN. CALL ODE AND DISCUSS OPTIONS TO ROLL TF 20° R&L OF 160°TO CLEAN HOLE FOR DRIFT AND WS ANCHOR. 03/03/11 21:00 22:00 REAMED HOLE AT 0.5 FPM FROM 9585'TO 9570'AT 160°, 180°AND 140°. RIH AT MILLED TF @ 160°AND PILOT HOLE IS CLEAN. RIH TO BOTTOM AND CHASE OUT CUTTINGS WITH HI-VIS BIO/KCL AND CHASE UP TO 9450' 1 03/03/11 22:00 23:00 OPEN EDC AND POOH AT MAX RATE CHASING CEMENT TO SURFACE WELL: S-01C Operations Summary Rai_ Page 3 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/03/11 23:00 23:30 PJSM TO LD MILLING BHA 03/03/11 23:30 0:00 OOH CHECK FOR FLOW, NO FLOW. PU INJECTOR AND LD MILLING BHA 03/04/11 0:00 1:00 LD BHA AND MILL CAME OUT 2.72 GO 2.71 NO GO. CALL ODE ABOUT UNDER GAUGED MILL AND SUGGEST WE CONTINUE WITH DRIFT AND CALIPER LOG. CALIPER LOG WILL LET US KNOW IF WE HAVE AND UNDER GAUGED HOLE AND WE AN RUN ANOTHER 2.74" MILL. 03/04/11 1:00 1:45 PLAN FORWARD IS TO CONTINUE MOVING FORWARD WITH WELL PLAN RU CREW ON LOCATION TO SWAP OUT TIGER TANKS 03/04/11 1:45 2:00 PJSM TO MU DRIFT BHA 03/04/11 2:00 2:30 MU DRIFT BHA 03/04/11 2:30 4:25 RIH WITH 2.625" DRIFT BHA 03/04/11 4:25 4:40 TIE IN 03/04/11 4:40 4:50 CORRECT DEPTH -16', RIH SLOW TO TOC THEN SLOW DOWN TO 10 FPM UNTIL WE GET PAST CASING CONTACT POINT AT 9580'. PUMP AT 0.4 BPM 03/04/11 4:50 5:05 SAW A LITTLE DRAG -3-400#AT 9585'TO 9587'AND AGAIN AT 9590' TO 9592' GETTNG SOME WEIGHT BOBBLES, SHUT DOWN PUMP 03/04/11 5:05 8:00 TAG BOTTOM AT 9835' PU 20'THEN KICK PUMP ON 9600'TO 9570'WAS CLEAN PULLING BACK THROUGH, CONTINUE POOH. 03/04/11 8:00 9:00 TAG STRIPPER, L/D DRIFT ASSEMBLY. 03/04/11 9:00 9:30 LOAD MEMORY CALIFER TOOLS TQ RICA FLOOR VERIFY TOOL MEASUREMENTS AND M/U BHA SHEET. PJSM FOR P/U LOGGING TOOLS. 03/04/11 9:30 11:00 M/U BHA#3- MEMORY CALIPER TOOLS. TEST TOOL AT SURFACE, ARMS EXTEND THEN RETRACT. M/U CT RISER. 03/04/11 11:00 13:00 RIH CAREFULLY WITH BHA#3. 03/04/11 13:00 13:40 3 BBLS PIT GAIN OVER PIPE DISPLACEMENT ON SLB DRILLER TRIP SHEET. STOP CT AND PUMP, FLOW CHECKWELL. NO FLOW. FIND THAT SLB DEPTH COUNTER AT INJECTOR IS READING WRONG, ABOUT 800 FT LESS THAN BHI DEPTH. HOWEVER THE BHI ENCODER AND THE SLB ENCODER AT THE REEL ARE READING CORRECTLY. 3 BBL PIT GAIN CAME FROM THE 800 FT DEPTH DISCREPANCY. CONTINUE RIH. 03/04/11 13:40 14:35 TIE-IN DEPTH FROM 9450 FT, CORRECT-15.5 FT. STOP AT 9825 FT AND FIX DPS, SLB ENCODER. COUPLER FOR DPS ENCODER HAS COME OFF. 03/04/11 14:35 15:05 START LOGGING UPWARDS AT 40 FT/MIN. SLB ENCODER NOW WORKING CORRECTLY, MATCHING BHI EXACTLY. PARK AT 9399 FT AND WAIT FOR ARMS TO RETRACT. 03/04/11 15:05 16:40 POOH. 03/04/11 16:40 18:00 TAG STRIPPER AND L/D LOGGING TOOLS. ALL CALIPER ARMS ARE IN PLACE. DOWNLOAD DATA AND SEND TO HOUSTON FOR PROCESSING. 03/04/11 18:00 23:15 CONTINUE WAITING FOR LOGS TO BE PROCESSED 03/04/11 23:15 0:00 PDS DATA SHOWS WE HAVE A CLOSE TO HIGHSIDE HOLE AND 2.75"OR LARGER HOLE BIG ENOUGH TO SET THE WS ANCHOR. CALL OUT BTT WS 03/05/11 0:00 1:00 CONTINUE WO CALIPER LOG TO BE PROCESSED 03/05/11 1:00 1:20 BTT HAND ON LOCATION WITH WS, LOAD TOOLS ON RIG 03/05/11 1:20 1:30 MU SETTING TOOL TO WS 03/05/11 1:30 1:40 PJSM TO MU WS BHA 03/05/11 1:40 2:00 MU WS BHA, USE DIAL INCLINOMETER TO ZERO HS OF WS AND SCRIBE MU MWD AND MEASURE OFFSET 03/05/11 2:00 2:20 PU INJECTOR AND MU BHI UQC TO LQC 03/05/11 2:20 4:35 RIH WITH EDC OPEN PUMPING AT MIN RATE 03/05/11 4:35 4:50 TIE IN TO UPPER MAKER ABOVE TOC 03/05/11 4:50 5:15 RIH TO 9650'AND TIE INTO SAG RIVER MARKER AND CORRECT-2'AND RIH WELL: S-01C Operations Summary Rel_ Page 4 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/05/11 5:15 5:30 WT CK AT 9775'44K UP RIHWT 14K RIH TO 9792/5'AND SET WS,TOWS IS 8.78 5' UP AT 9784' SETTING TOOL SHEARED AT 4000 PSI, STACK 9.6K DOWN AND NO MOVEMENT AN 03/05/11 5:30 7:00 POOH PVT=411 BBLS C • 03/05/11 7:00 7:20 AT SURFACE, PJSM. 03/05/11 7:20 8:30 STAND BACK COILTAK TOOL AND UD WHIPSTOCK RUNNING TOOLS. TOOLS HAVE FUNCTIONED NORMALLY. M/U BHA#5 -WINDOW MILLING BHA WITH 2.74 MILL AND STRING REAMER, 0.6 DEG MOTOR+2.38 COILTRAK. BHA OAL= 59.01 FT. 03/05/11 8:30 10:30 RIH BHA#5. LOG GR TIE-IN FROM 9650 FT, CORRECT-15.5 FT. 03/05/11 10:30 22:10 TAG BOTTOM A-1_9785_ FT AND BEGIN TIME MILLING. MAINTAIN OL TF. FS IS 2800 PSI @ 1.6 BPM. 10:00-9785.70 FT 2827 PSI 1.24K DWOB. 11:00-9786.50 FT 2944 PSI 1.88K 13:00-9787.06 FT 2937 PSI 2.08K 14:00-9787.30 FT 2926 PSI 1.91K 15:00 - 9787.71 FT 2893 PSI 1.83K 16:00-9787.80 FT 2897 PSI 1.85K 17:00-9788.20 FT 2867 V PSI 2.04K 19:00 -9788.80 FT 2842 PSI 1.97K 19:40-9789.00 FT 2938 PSI 2.11K 21:40 - 9790.10 FT 2834 PSI 1.60K EXIT 7"CASING 100 PSI PRESSURE AND 500#WOB LOSS CONTINUE TIME MILLING FOR 1.4' TO GET STRING MILL PAST BOTTOM OF WINDOW THEN STARTPUSH TO GET AWAY FROM CASING (V( 03/05/11 22:10 23:00 PUMP 35 BBLS 2# BIO PILL THEN CHASE WITH DRILLING MUD 03/05/11 23:00 0:00 START MILLING RAT HOLE 9791.4' 00:00 9796' 3470 PSI 1.96K WOB CONTINUE MILLING RAT HOLE WHILE SWAPPING WELL TO MUD 03/06/11 0:00 1:10 CONTINUE MILLING RAT HOLE NEW MUD BOTTOMS UP SAMPLE FROM 9795' HAS GOOD FORMATION IN IT AND QUITE A BIT OF METAL 03/06/11 1:10 2:05 PU AND BACK REAM 03/06/11 2:05 2:15 MADE 5 CLEAN PASSES WITH PUMP ON, SHUT DOWN PUMP FOR DRY DRIFT 03/06/11 2:15 3:30 DRY DRIFT IN BOTH DIRECTIONS CLEAN, POOH FOR BUILD BHA. SAMPLE FROM 9795' IS 60% FORMATION 03/06/11 3:30 3:45 1300' PJSM TO LD BHA 03/06/11 3:45 4:15 OOH CLOSE EDC PU INJECTOR AND REMOVE INJECTOR PU BHA AND LD MOTOR GAUGE MILLS WINDOW MILL 2.74 GO 2.73 NO GO WITH VERY GOOD WEAR IN THE CENTER STRING MILL 2.74 GO 2.73 NO GO, STRING MILL IN GOOD CONDITION 03/06/11 4:15 5:00 MU HCC BI-CENTER BIT ON 2.1° MOTOR BHA. 03/06/11 5:00 6:30 RIH. PUMP 0.57 BPM/ 1370 PSI THROUGH OPEN EDC. 03/06/11 6:30 8:30 LOG GR TIE-IN AT 9450 FT, CORRECT-16.5 FT. TAG BOTTOM AT 9800 FT AND DRILL TO 9805 FT. TF IS ERRATIC, PULL INTO CASING AND VERIFY. TOLL IS OK, CONTINUE DRILLING. DRILL TO 9861 FT. 03/06/11 8:30 9:00 GETTING INCONSISTENT DLS. AVERAGE IS ABOUT 34 DEG/100 FT. CONTINUED DRILLING WITH THESE DL WILL LIMIT THE AMOUNT OF LATERAL THAT CAN BE DRILLED. POOH. 03/06/11 9:00 10:45 TRY TO OPEN EDC ABOVE WINDOW AND CAN'T, DP IS TOO HIGH. PULL BACK THROUGH PILOT PUMPING 0.3 BPM THROUGH BIT. ABOVE PILOT HOLE STOP AND OPEN EDC. CONTINUE POOH. 03/06/11 10:45 11:00 PJSM FOR LID BHA. 03/06/11 11:00 12:00 AT SURFACE, STAND BACK COILTRAK AND DIAL DOWN MOTOR TO 1.5 DEG. M/U BHA #7. CLEAR BIT, HAS 2 PLUGGED JETS. 03/06/11 12:00 13:50 RIH BHA#7. PUMP 0.2 BPM THROUGH THE BIT WHILE RIH. 03/06/11 13:50 15:10 LOG GR FRO 9650 DOWN TO TIE-IN, CORRECT-17.5 FT 03/06/11 15:10 16:00 CONTINUE RIH TO BOTTOM. DRILL FROM 9860 FT TO 9900 FT. SHORT WIPER FROM 9900 FT TO WINDOW. 03/06/11 16:00 17:00 DRILL FROM 9900 FT. HOLD OL TF FOR NOW TO BUILD ANGLE. PUMP A 10 BBL LO- VIS SWEEP. ROP IS 100-150 FT/HR WITH 0.5-1K DWOB. PULL SHORT WIPERS ABOUT EVERY 50 FT. DRILL TO 9951 FT. 03/06/11 17:00 18:30 DGS HAS FAILED, POOH. ..__.... ......... WELL: S-01 C Operations Summary Rel. Page 5 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To_..:.,.._Operalton 03/06/11 18:30 18:45 PJSM TO LD BHA AND REPLACE BHI DGS 03/06/11 18:45 19:30 OOH CHECK FOR FLOW AND REMOVE INJECTOR, LOST 11 BBLS ON TRIP OOH 03/06/11 19:30 20:00 BHA OOH, INSTALL NIGHT CAP AND HOLD PJSM TO PT MASTER &SWAB AND OPEN BOP'S TO INSPECT RAMS FOR METAL FROM CUTTING WINDOW 03/06/11 20:00 22:30 PRESSURE TEST MASTER &SWAB AS PER BREAKING CONTAINMENT IN ADWOP HAVING TROUBLE WITH MASTER WITH SLIGHT BLEED OFF GOOD TEST ON MASTER, PT SWAB BLEED OFF AND RETEST SWAB 03/06/11 22:30 23:30 GOOD TEST ON BOTH BARRIERS, PJSM TO OPEN DOORS TO INSPECT RAMS 03/06/11 23:30 0:00 UPPER SET OF COMBI'S LOOK GOOD, OPEN LOWER SET CONTINUE INSPECTING BOP RAMS 03/07/11 0:00 0:15 CONTINUE INSPECTING BOPE 03/07/11 0:15 1:30 BOP RAM INSPECTION COMPLETED, SHELL TEST BOPE TO 300 & 3500PSI 03/07/11 1:30 1:45 PJSM TO MU BUILD BHA 03/07/11 1:45 2:10 MU BHA 03/07/11 2:10 3:50 RIH 03/07/11 3:50 4:45 TIE IN AT 9470'AND CORRECT DEPTH -17'. RIH TO SAG RIVER MARKER AND TIE IN AND CORRECT DEPTH -1.5' RIH TO TD AND CONTINUE DRILLING BUILD 03/07/11 4:45 5:40 ON BOTTOM DRILLING AT 9955' PVT=403 BBLS 1.6 BPM @ 3200 PSI WH/IA/OA= 26/59/10 PSI WOB= 0.6K- 1.2K ECD=9.61 03/07/11 5:40 8:00 FAST DRILLING, WIPER AFTER 100'TO MAKE SURE HOLE IS CLEAN WIPER TO WINDOW WAS CLEAN PUMP A 15 BBL LO-VIS SWEEP. DRILL TO 10167 FT. 03/07/11 8:00 8:40 DSO CALLS THE RIG, INFORMS US HE WILL BE VENTING GAS AT SKID 93, ABOUT 250 FT FROM RIG. PICK UP OFF BOTTOM AND PULL TO WINDOW. CANCEL HOT WORK AT RIG. INFORM CTD/RWO SUPT. SHUT OFF HEATERS ON DS OF RIG, CLOSEST TO SKID 93. OPEN EDC, PULL ABOVE PILOT HOLE AND PUMP 1.5 X BU VOLUME. 03/07/11 8:40 10:30 CT IS ABOVE PILOT HOLE. P/U SLOWLY AND CONTINUE CIRC B/U AT 2.2 BPM, THEN GO TO MIN RATE. CONTINUE MAKING NOTIFICATIONS AS PER LEVEL 0 INCIDENT ✓ FLOWCHART. CALL AND INFORM JOHN SMART AT 09:10 CALL AND INFORM ADW SAFETY REP AT 09:15 PJSM WITH NORDIC DRILLER AND SLB SUPERVISOR TO DISCUSS FURTHER CONTINGENCIES. 03/07/11 10:30 12:50 G :•11 • • • •■ 11_• • •••. :L • ► • :•• 03/07/11 12:50 13:30 OOH, TRIP SHEET SHOWS-2 BBLS. L/D BHA. M/U BHA#9, CHECK VALVE AND NOZZLES. 03/07/11 13:30 17:00 RIH BHA#9. PARK AT 2500 FT AND CIRC, WAIT FOR LRS. 03/07/11 17:00 18:30 LRS ARRIVES. MOVE CT UP TO 2200 FT AND START DIESEL DOWN CT. FREEZE PROTECT FROM 2200 FT TO SURFACE. LEAVE SOME DIESEL IN THE END OF THE CT FOR THE SHUTDOWN PERIOD. 03/07/11 18:30 19:00 LAY IN DIESEL FREEZE PROTECT 03/07/11 19:00 19:30 DIESEL AT SURFACE, TAG STRIPPER AND CHECK FOR FLOW NO FLOW, REMOVE INJECTOR AND LD BHA BHA LD, REMOVE BHI CHECKS 03/07/11 19:30 20:00 GREASE CREW SERVICING TREE 03/07/11 20:00 21:00 PJSM TO RU VALVE CREW BRING LUBRICATOR TO RIG FLOOR 03/07/11 21:00 21:20 STAB LUVBRICATOR AND FLUID PACK STACK WITH METH 03/07/11 21:20 21:45 PRESSURE TEST VALVE CREW LUBRICATOR TO 250 &3500 PSI WITH DIESEL PUMP 03/07/11 21:45 22:00 CCAT CRASHED AND CANNOT RECOVER PRESSURE TESTS ON MASTER. RU TEST PUMP HOSE TO VALVE CREW LUBRICATOR AND BACK PUMP DIESEL THROUGH HOSE AND SHUT IN 03/07/11 22:00 22:30 REPRESSURE TEST MASTER 03/07/11 22:30 23:20 GOOD TEST ON MASTER AND LEAK TIGHT TEST ON SSV, SET TWC 03/07/11 23:20 0:00 TWC SET AND VALVE CREW RD AND GONE, FLUID PACK STACK TO PT MASTER AND SWAB TO ND BOPE WELL: S-01C Operations Summary Rel. Page 6 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/08/11 0:00 1:00 CONTINUE TESTING TREE VALVES TO RDMO TO INSPECT BOPE 03/08/11 1:00 1:20 TREE VALVES TESTED, BLOW DOWN KILL&CHOKE LINES 03/08/11 1:20 1:50 PJSM TO ND BOPE 03/08/11 1:50 4:30 ND BOPE AND SUCK OUT PITS 03/08/11 4:30 5:20 PRESSURE TEST TREE CAP, FLANGE LEAKING. RETIGHTEN AND RETEST 03/08/11 5:20 8:00 GOOD TEST ON TREE CAP, CONTINUE RD MOVE OFF WELL. 03/08/11 8:00 12:00 RUN POWER OUT TO OFFICE TRAILER AND BULL RAIL. SET RIG DOWN ON MATS. SECURE CELLAR AND START BREAK DOWN BOPS FROM THE BOTTOM UP. 03/08/11 12:00 16:00 MOVE LOWER SET OF BOPS INTO WELDING SHOP. START BREAK APART FLOW CROSS. BREAK UPPER SET OF BOPS FROM ANNULAR AND MOVE THEM INTO WELD SHOP. 03/08/11 16:00 19:00 WEATHERFORD MACHINIST COMES OUT TO TAKE MEASUREMENTS OF THE UPPER AND LOWER API RING GROOVES ON BOTH SETS OF BOPS. SEND MEASUREMENTS P. TO ENGINEERS IN TOWN TO DETERMINE PASS/FAIL. y' 03/08/11 19:00 0:00 CONTINUE TO WARM BOPS IN WELD SHOP FOR FURTHER INSPECTION DUE TO VARIANCES IN MEASUREMENTS W/TEMPERATURE. WEATHERFORD MACHINIST BACK ON LOCATION AT 22:00 HRS TO TAKE ADDITIONAL MEASUREMENTS. 03/09/11 0:00 1:00 CONTINUE MEASURING API RING GROOVES ON BOP'S. ALL MEASUREMENTS ARE W/ IN API SPECS. DISCUSS RESULTS W/FIELD SUPT. AND PREPARE TO RETURN TO WORK. 03/09/11 1:00 1:25 PJSM FOR RE-ASSEMBLING STACK. 03/09/11 1:25 5:30 RE-ASSEMBLE BOP STACK TOP DOWN FROM ANNULAR. INSTALL UPPER SET OF TOT'S FOLLOWED BY FLOW CROSS AND LOWER SET OF TOT'S. BEGIN PREPPING DRIVE SYSTEM FOR MOVING OVER WELL. 03/09/11 5:30 9:00 TIGHTEN ALL FLANGES ON STACK. ATTACH BOP WALKWAY AND VALVES 17, 18 ON BOP KILL PORT. LIFT UP STACK AND SECURE IT IN CELLAR. 03/09/11 9:00 9:20 PJSM FOR MOVING RIG BACK OVER WELL. DISCUSS HAZARDS AND POSITION OF SPOTTERS. 1/ 03/09/11 9:20 10:40 MOVE RIG BACK OVER WELL. STOP MOVE AND CREW WARMS UP EVERY 20 MIN DUE TO LOW WIND CHILLS. ACCEPT RIG BACK ON WELL AT 10:00. 03/09/11 10:40 12:00 CLOSE CELLAR DOORS AND SET RIG DOWN. SPOT CUTTINGS BOX AND R/U SAT. OFFICE. 03/09/11 12:00 18:00 PJSM FOR N/U BOPE. REMOVE TREE CAP. N/U BOP'S. 03/09/11 18:00 18:30 CREW CHAGE-OUT. DISCUSS CURRENT OPS AND MAKE RIG ROUNDS AND CHECKS. 03/09/11 18:30 22:00 FINISH N/U BOP'S. GREASE CHOKE MANIFOLD. M/U LUBRICATOR AND FINISH HOOKING UP KOOMEY HOSES AND CHOKE AND KILL LINE HOSES. OPEN UP BOP DOORS AND INSPECT BLIND/SHEAR CAVITY AND RAMS-GOOD. CLOSE BOP DOORS AND FILL STACK. 03/09/11 22:00 0:00 PT BOPE AS PER AOGCC REGS, ADWOP, AND PERMIT TO DRILL. 250 PSI LOW/3500 8st) PSI HIGH. JOHN CRISP W/AOGCC WAIVED WITNESS TO TEST.03/10/11 0:00 3:00 CONTINUE PT BOPE AS PER AOGCC REGS, ADWOP, AND PERMIT TO DRILL. JOHN CRISP W/AOGCC WAIVED WITNESS TO TEST. 250 PSI LOW/3500 PSI HIGH. GS 03/10/11 3:00 4:00 P/U INJECTOR IN PREP FOR PT INNER REEL VALVE AND CT PACK-OFF. CIRCULATE OUT DIESEL IN COIL. 03/10/11 4:00 4:30 LINE UP TO REVERSE CIRC. AND PT INNER REEL VALVE AND CT PACK-OFF. 03/10/11 4:30 6:00 INSTALL BHI UQC CHECKS AND PT. CAN'T GET HIGH PT. STOP AND CIRC. TO WARM COIL. RE-PT LOW AND HIGH -GOOD. 03/10/11 6:00 7:00 PREP RIG FLOOR TO PULL TWC. 03/10/11 7:00 7:20 PJSM WITH TWC CREW FOR LIFTING LUBRICATOR TO FLOOR. 03/10/11 7:20 8:30 LIFT TWC LUBRICATOR TO RIG FLOOR AND M/U PULLING TOOLS. M/U LUBRICATOR TO CT RISER AND PT 250/3500 PSI, GOOD. 03/10/11 8:30 9:15 OFFLOAD PULLING TOOLS AND TING LUBRICATOR. WELL: S-01C Operations Summary Ret. Page 7 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/10/11 9:15 9:50 OPEN WELL, ON SLIGHT VAC. FILL WELL WITH 4 BBLS AND MONITOR FOR 30 MIN. 03/10/11 9:50 10:10 PJSM FOR M/U BHA#10. 03/10/11 10:10 11:00 M/U BHA#10- 1.0 DEG AKO WITH 2-3/8 COILTRAK WITH RES, 2.7"X 3" HCC BI CENTER. 03/10/11 11:00 11:30 RIH. TAKE RETURNS TO FLOWBACK TANK OUTSIDE. 03/10/11 11:30 11:50 STOP AT 3000 FT AND STRAP FLOWBACK TANK TO VERIFY FLUID DISPLACEMENT. OUT MM SHOWS TOTAL DISPLACEMENT 11.2 BBLS MORE THAN WAS PUMPED, MATCHING CT DISPLACEMENT. STOP HERE AND PUMP UNTIL CLEAN RETURNS ARE SEEN. 03/10/11 11:50 13:10 CLOSE EDC. RE-BOOT TOTCO PVT SYSTEM. CONTINUE RIH. PUMP 0.15 BPM/800 PSI THROUGH THE BIT 03/10/11 13:10 14:00 PASS THROUGH WINDOW AT OL TF. LOG TIE-IN FROM 9830 FT. CORRECT-15.5 FT. RE-BOOT TOTCO PVT SYSTEM. CONTINUE RIH TO BOTTOM. TAG AT 10085 FT, CLEAN PICKUP. 03/10/11 14:00 15:00 TOTCO PVT ALARM ISN'T WORKING. PULL THROUGH WINDOW AND ABOVE PILOT HOLE. RESET TOTCO DAC ON 2ND LEVEL AND RE-TEST ALL THE PVT SYSTEM FUNCTIONALITY, LOOKS GOOD. RUN BACK IN HOLE TO CONTINUE DRILLING. 03/10/11 15:00 16:40 TAG BOTTOM AT 10166 FT. WORK BACK THROUGH SHALES TO CLEAN UP AREA FROM 10100-10150 FT. MOTOR WORK AND 5K OP AT 10115 FT. RIH AND PULL THROUGH IT AGAIN. DRILL FROM 10169 FT. HOLD 90L TF FOR NOW TO CONTINUE LH TURN AND GET LINED UP DOWN THE POLYGON. 1.73/ 1.71 BPM @ 3500-3900 PSI. ROP IS 70 FT/HR WITH 0.8K DWOB. AT 10210 FT PUMP 10 BBLS LO-VIS SWEEP AROUND. DRILL TO 10300 FT. 03/10/11 16:40 18:30 WIPER TRIP FROM 10300 FT TO ABOVE PILOT HOLE. PULL UP TO WINDOW AND OPEN EDC. PILOT HOLE CLEAN. RBIH AND CLOSE EDC ABOVE WINDOW. PASS THRU WINDOW CLEAN. STACK 5K#AT 10160 FT. PICK BACK UP AND WORK THRU DOWN TO 10175 FT. 03/10/11 18:30 20:30 MAD PASS FROM 10175 FT BACK TO WINDOW AT 180 FPH. CCL WAS LOGGED INSTEAD OF RESISTIVITY. RBIH TO 10175 FT. TO MAD PASS FOR RES. 03/10/11 20:30 22:00 MAD PASS FOR RES FROM 10175 FT AT 300 FPH. 1� 03/10/11 22:00 22:25 RIH TO BOTTOM CLEAN. 03/10/11 22:25 0:00 DRILL AHEAD FROM 10300 FT. 3460 PSI FS @ 1.81 / 1.84 BPM IN/OUT. ROP IS 90-100 FPH W/2K DHWOB. 250-350 PSI MW. BHP/ECD/PVT: 4424 PSI /9.62 PPG/383 BBLS. DRILL TO 10440 FT. 03/11/11 0:00 0:15 DRILL AHEAD FROM 10440 FT. DRILL TO 10450 FT AND BEGIN WIPER TO WINDOW. 03/11/11 0:15 1:00 WIPER TO WINDOW FROM 10440 FT. 1.81 BPM @ 3500 PSI. 03/11/11 1:00 2:45 DRILL AHEAD FROM 10450 FT. 1.81 / 1.84 BPM IN/OUT. 3700-3750 PSI CIRC. ROP 100 FPH W/ 1.0K# DHWOB. BHP/ECD/PVT: 4425 PSI /9.67 PPG/376 BBLS. PUMP 10 BBL LO VIS FOLLOWED BY 10 BBL HI-VIS SWEEP. DRILL TO 10600 FT. 03/11/11 2:45 3:30 WIPER TO WINDOW. 1.81 BPM @ 3420 PSI. HOLE SMOOTH. 03/11/11 3:30 4:00 LOG GR TIE-IN @ RA TAG. MAKE+5.0 FT CORRECTION. 03/11/11 4:00 4:30 RIH TO BOTTOM. HOLE SMOOTH. *NO ADDITIONAL CUTTINGS SEEN COMING OVER SHAKER W/SWEEP* 03/11/11 4:30 7:00 DRILL AHEAD FROM 10600 FT. 1.84/ 1.86 BPM IN/OUT @ 3520 PSI FS. ROP 100-110 FPH W/ 1.5K# DHWOB. 200-250 PSI MW. BHP/ECD/PVT: 4425 PSI /9.67 PPG/358 BBLS. PUMP SWEEP AROUND. DRILL TO 10750 FT. 03/11/11 7:00 8:20 WIPER TRIP FROM 10750 FT TO ABOVE PILOT HOLE. PULL THROUGH WINDOW AND OPEN EDC, PUMP B/U AT 2.3 BPM. OBSERVE SWEEP COMING AROUND AT SHAKER, NO UNUSUAL CUTTINGS SEEN. RIH BACK TO BOTTOM AND DRILL. CLEAN PASS UP AND DOWN. 03/11/11 8:20 9:00 DRILL FROM 10750 FT. 90L TF FOR NOW TO STAY IN POLYGON AND START DROPPING ANGLE. ROP IS 110 FT/HR WITH 1.3K DWOB. 1.74/ 1.78 BPM @ 3400-3700 PSI. 8.78/8.0 PPG IN/OUT. NEW MUD IS ON LOCATION. DRILL TO 10789 FT. WELL: S-01C Operations Summary Rep. Page 8 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/11/11 9:00 10:00 P/U DUE DUE TO AZIMUTH INACCURACIES ON SURVEYS. LIKELY MAGNETIC DISTURBANCES DUE TO SOLAR ACTIVITY IS CAUSING AZIMUTH READINGS OUT OF TOLERANCE. DISCUSS WITH TOWN AND SEND ALL SURVEYS DRILLED SO FAR TO IFR STATION TO GET CORRECTED. 03/11/11 10:00 10:15 PJSM WITH CREW TO DISCUSS MUD SWAP AND PLAN FORWARD. 03/11/11 10:15 12:30 START MUD SWAP. AT 11:00 CORRECTED SURVEYS RETURNED FROM IFR, MOVED TD ABOUT 3 FT SOUTH, AWAY FROM THE EDGE OF THE POLYGON. CONTINUE DRILLING AHEAD. NEXT SURVEY AFTER 10789 FT IS WITHIN QC TOLERANCE. DRILL TO 10900 FT. 03/11/11 12:30 14:00 WIPER TRIP FROM 10900 FT TO WINDOW. CLEAN PASS UP AND DOWN 03/11/11 14:00 15:50 DRILL FROM 10900 FT. START REDUCING INC TO PREP FOR FAULT CROSSING. SURVEYS HAVE CLEANED UP. MUD SWAP IS COMPLETE. 1.61 / 1.63 BPM @ 3900-4100 PSI. ROP IS 90-100 FT/HR WITH 2-3K DWOB. DRILL TO 11050 FT. 03/11/11 15:50 17:30 WIPER FROM 11050 FT TO WINDOW. CLEAN PASS UP AND DOWN. 03/11/11 17:30 19:30 DRILL AHEAD FROM 11050 FT. 1.61 / 1.63 BPM IN/OUT. 3900-4100 PSI CIRC. ROP 80- 110 FPH W/ 1.5-2K#DHWOB. BHP/ECD/PVT: 4523 PSI /9.89 PPG/381 BBLS. SEE SLIGHT LOSSES PAST 11143 FT. SHORT WIPER AND GET BACK 1:1 RETURNS. SLIGHT LOSSES AGAIN PAST 11173 FT. 1.64/ 1.52 BPM IN/OUT. PUMP 15 BBL LO-VIS PILL DRILL TO 11200 FT. 03/11/11 19:30 21:15 WIPER TO WINDOW. HOLE SMOOTH BOTH WAYS. LOST-4 BBLS ON WIPER TRIP. 03/11/11 21:15 0:00 DRILL AHEAD FROM 11200 FT. 1.62/ 1.46 BPM IN/OUT AT 4150 PSI CIRC. ROP 80 FPH W/ 1.5-2.5K#DHWOB. ROP SLOWS PAST 11250 FT. DRILL TO 11310 FT. 03/12/11 0:00 0:30 DRILL AHEAD FROM 11310 FT HOLDING LEVEL AFTER DROPPING DOWN FOR PLANNED FAULT CROSSING. 1.64/ 1.55 BPM IN/OUT. 3950-4100 PSI CIRC. ROP 80- 100 FPH W/ 1.0-1.5K# DHWOB. PUMP 10 BBLS LO-VIS SWEEP. BHP/ECD/PVT: 4656 PSI / 10.13 PPG/424 BBLS. DRILL TO 11350 FT. 03/12/11 0:30 2:15 WIPER TRIP TO WINDOW. 1.63 BPM @ 3730 PSI. HOLE CLEAN BOTH WAYS. LOST TOTAL OF 10 BBLS DURING WIPER. 03/12/11 2:15 5:00 DRILL AHEAD FROM 11350 FT. CONTINUE HOLDING LEVEL. 1.64/ 1.56 BPM IN/OUT. 4050-4200 PSI CIRC. 90-100 FPH W/ 1.5-2.5K#DHWOB. SLOWS TO 50 FPH PAST 11410 FT. LOSSES-5 BPH. BHP/ECD/PVT: 4655 PSI / 10.13 PPG/414 BBLS. PUMP 10 BBL LO-VIS SWEEP. DRILL TO 11500 FT. r/ 03/12/11 5:00 6:30 WIPER BACK TO WINDOW AND UP ABOVE PILOT HOLE. OPEN EDC AND PUMP B/U AT A HIGH RATE. 03/12/11 6:30 7:50 CONTINUE LONG WIPER ABOVE PILOT HOLE. PUMP 1 B/U THROUGH OPEN EDC. 03/12/11 7:50 8:00 LOSE POWER ON RIG. GO TO BACKUP GENERATOR. SEND FLOORHAND TO PITS TO WATCH WELL WHILE RIG IS POWERING BACK UP. 03/12/11 8:00 8:20 START RIH AGAIN. GO TO 10900 FT AND PICK UP SLOWLY FOR A SURVEY VALIDATION TEST. 03/12/11 8:20 8:50 RIH TO BOTTOM. 03/12/11 8:50 10:50 DRILL FROM 11500 FT. HOLD 70L TF FOR NOW TO START BUILDING ANGLE AND STAY IN THE POLYGON. CONDUCT MR ON LOSS OF RIG POWER EVENT AND RESPONSE. DRILL AT 100 FT/HR WITH 2-3K DWOB. 1.63/ 1.62 BPM @ 3900-4200 PSI. PVT= 391 BBLS. STARTING TO SEE DIFFERENTIAL STICKING ON BOTTOM. DRILL TO 11650 FT. 03/12/11 10:50 12:30 WIPER TRIP FROM 11650 FT TO WINDOW. CLEAN PASS UP AND DOWN. 03/12/11 12:30 14:30 DRILL FROM 11650 FT. CONTINUE PUSHING UPHILL TOWARDS THE SECOND CREST IN THE PLANNED TRAJECTORY. 1.62/ 1.63 BPM @ 3800 PSI FS. ROP IS 100-150 FT/HR WHEN SLIDING, WITH FREQUENT WT STACKING. LO-VIS SWEEPS ARE HELPING WT TRANSFER BY DECREASING ECD WHEN THEY COME AROUND. DRILL TO 11795 FT. 03/12/11 14:30 16:30 WIPER TRIP FROM 11795 FT TO WINDOW. CLEAN PASS UP AND DOWN. WELL: S-01 C Operations Summary Rel. Page 9 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/12/11 16:30 18:00 DRILL FROM 11795 FT. HOLD 90L FOR NOW TO MAINTAIN ND AND STAY IN POLYGON. 1.64/ 1.66 BPM @ 3900-4300 PSI. MUD SWAP SCHEDULED FOR AFTER CREW CHANGE. ROP IS ABOUT 100-150 FT/HR WITH FREQUENT WT STACKING. PUMP 10 BBLS LO-VIS SWEEP AROUND. 03/12/11 18:00 19:45 CONTINUE DRILLING AHEAD WHILE WAITING ON TRUCKS FOR MUD SWAP. 1.71 / 1.74 BPM IN/OUT @ 4150 PSI CIRC. ROP IS 30-60 FPH W/2.0-2.5K# DHWOB AND FREQUENT WT STACKING. BHP/ECD/PVT: 4724 PSI/ 10.30 PPG/393 BBLS. SEEING GOOD SLIDE BUT POOR WT TRANSFER. DRILL TO 11910 FT AND BEGIN LONG WIPER. 03/12/11 19:45 22:00 LONG WIPER BACK UP TO ABOVE PILOT HOLE. ISOLATE PIT 2 AND OFFLOAD FLUID IN PREP FOR MUD SWAP FOLLOWING WIPER. ACTIVE PITS 3,4, &5. PVT: 223 BBLS. PULL ABOVE WINDOW, OPEN EDC AND PUMP B/U FROM 9500 FT. 03/12/11 22:00 23:30 RIH TO WINDOW AND CLOSE EDC. LOG GR TIE-IN AND MAKE +4.5 FT. CORRECTION. 03/12/11 23:30 0:00 BACK ON BOTTOM AND BEGIN MUD SWAP TO NEW POWERVIS SYSTEM W/NEW MUD OUT AND AROUND CIRC. PRESSURES HAVE DECREASED. OBTAIN NEW SLOW PUMP RATES AND DRILL AHEAD FROM 11910 FT. 03/13/11 0:00 0:45 DRILL AHEAD FROM 11910 FT WHILE DISPLACING ENTIRE WELL OVER TO NEW MUD. 1.80 BPM IN/OUT @ 3400-3500 PSI CIRC. ROP 100 FPH W/ 1.5-2K# DHWOB. WT TRANSFER IMPROVED W/NEW MUD IN THE HOLE. 00:45 - NEW MUD ALL THE WAY AROUND. 03/13/11 0:45 4:00 3020 PSI FS @ 1.80 BPM IN/OUT. ROP SLOWS TO 20-40 FPH W/2-3K#DHWOB. STARTING TO SEE WT TRANSFER PROBLEMS. GEO CONFIRMS WE ARE DRILLING THRU CLAY SECTION. PUMP 10 BBL LO-VIS SWEEP AROUND W/O SEEING ANY ADDITIONAL BENEFITS. DECIDE TO POOH TO CHECK BIT AND P/U AGITATOR TO TD WELL. 03/13/11 4:00 7:20 START TRIP SHEET AND POOH FOR BIT AND AGITATOR. 1.80 BPM @ 3020 PS1. OPEN EDC ABOVE WINDOW AND POOH PUMPING AT 2.55 BPM @ 3875 PSI. 03/13/11 7:20 8:00 AT SURFACE. L/D BHA. BIT IS 1-2. 03/13/11 8:00 9:00 PT BHI FLOAT SUB TO 250/ 1500 PSI, GOOD. 03/13/11 9:00 9:15 PJSM FOR P/U BHA#11. WELL CONTROL AND OVERHEAD LOADS WERE DISCUSSED. 03/13/11 9:15 10:20 P/U BHA#11. REBUILT HCC BI-CENTER, NEW 1.0 DEG XTREME, NEW AGITATOR, FLOAT SUB AND 2.38 COILTRAK WITH RES. BHA OAL= 75.73 FT. WHILE P/U BHA PERFORM KICK WHILE BHA HANDLING DRILL AND AAR. 03/13/11 10:20 14:20 RIH BHA#11. STOP AT 200 FT AND CHECK AGITATOR, GOOD. TIE-IN DEPTH, CORRECT-17 FT. PERFORM SURVEY VALIDATION FROM 10900 FT TO COMPARE AGAINST PREVIOUS RUN. 03/13/11 14:20 14:50 TAG BOTTOM. STACKING WT ON THE WAY DOWN, LAST 50 FT OF HOLE. BACKREAM LAST 250 FT OF HOLE. 03/13/11 14:50 18:00 DRILL FROM 12037 FT. CONTINUE PUSHING UPHILL TO AN EXPECTED CREST ABOUT 100 FT AWAY. DIFFICULT WEIGHT TRANSFER, DRILLING STICKY FORMATION INITIALLY. 1.65/ 1.64 BPM @ 3400-3800 PSI. ROP IS 40-80 FT/HR WITH 2-3K DWOB, -6K CT WEIGHT. DRILL TO 12153 FT. 03/13/11 18:00 21:15 WIPER TO WINDOW FROM 12153 FT. WORK UP THRU SHALE INTERVALS BETWEEN 11265 - 11500 FT. WORK DOWN THRU SHALES AT 10160 FT- 10170 FT. SLIGHT MOTOR WORK AND SIGNS OF PACKING OFF. 03/13/11 21:15 0:00 DRILL AHEAD FROM 12153 FT CRESTING AND POINTING DOWN. 1.57/ 1.56 BPM IN/OUT @ 3500-3650 PSI CIRC. ROP 10-50 FPH W/2-3K#DHWOB AND +9K#CT WEIGHT. BHP/ECD/PVT: 4433 PSI/9.68 PPG/375 BBLS. DRILL TO 12223 FT. WELL: S-01 C Operations Summary Rei. Page 10 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/14/11 0:00 2:00 DRILL AHEAD FROM 12223 FT. CONTINUE POINTING DOWN HEADED TOWARD 8840' TVD. 1.56 BPM IN/OUT @ 3500-3600 PSI CIRC. ROP 40-60 FPH W/ 1.5-2.5K#DHWOB. BHP/ECD/PVT: 4445 PSI /9.70 PPG/374 BBLS. AT 12297 FT OUT RATE DROPS OFF AND INITIALY 1.58/0.6 BPM IN/OUT. DRILL TO 12300 FT AND START WIPER TO WINDOW. PUMP 20 BBL LO-VIS PILL. 03/14/11 2:00 4:15 WIPER TO WINDOW. 1.58/ 1.33 BPM IN/OUT AT 3480 PSI. LOSING-0.15 BPM OVER CLOSED END DISPLACEMENT. WORK THRU AND BACKREAM SHALES FROM 11500 FT- 11250 FT. 03/14/11 4:15 7:30 BOBD. DRILL AHEAD FROM 12300 FT. 1.58/ 1.52 BPM IN/OUT @ 3700-3800 PSI CIRC. ROP 50-80 FPH W/ 1-2K DHWOB. BHP/ECD/PVT: 4468 PSI /9.09 PPG/359 BBLS. 03/14/11 7:30 7:40 DRILL PAST 12389 FT, LOSE RETURNS. CALL FOR 2 TRUCKS OF USED MUD. CLOSE CHOKE AND DRILL A FURTHER 15 FT, HOLE IS STAYING FULL ACCORDING TO ECD, BUT NO WHP. LOSS ZONE SHOW NO SIGN OF HEALING, NOT ENOUGH MUD TO CONTINUE DRILLING. 03/14/11 7:40 9:00 PICK UP TO ABOVE PILOT HOLE AND WAIT FOR MUD TO ARRIVE. DISCUSS PLAN FORWARD WITH ANC. HOLE IS CLEAN, SOME 2-5K WEIGHT FLUCTUATIONS THROUGH 11500 TO 11250 FT. 03/14/11 9:00 11:00 PUMP 1.58/0 BPM THROUGH THE BIT UP TO THE WINDOW. AT 10500 WHP= 22 PSI, OPEN WELL AND GET A THIN STREAM OF RETURNS, NOT ENOUGH TO REGISTER ON THE MM. PULL THROUGH WINDOW WITH 0.3 BPM PUMP RATE THEN STOP AND OPEN EDC. PUMP 1 BPM THROUGH OPEN EDC, PULL ABOVE PILOT HOLE. PVT= 170 BBLS. RETURNS HAVE GONE AWAY. ECD = 8.45 PPG. PARK AT 9450 FT AND FILL WELL ACROSS TOP WITH C-PUMP. FILL HOLE WITH STATIC LOSS RATE OF 40-50 BBLS/HR. WAIT FOR VAC TRUCKS TO ARRIVE WITH MORE FLUID. MOVE PIPE UPHOLE SLOWLY TO KEEP FROM FREEZING THE CT ACROSS THE PIPE SHED ROOF. 03/14/11 11:00 12:20 VAC TRUCK ARRIVES, HOOK UP AND START FILLING PITS. 03/14/11 12:20 13:20 PUMP THROUGH CT AT MIN RATE, VERIFY IT ISN'T FROZEN. 03/14/11 13:20 13:50 PITS ARE FULL WITH ONE FULL TRUCK STANDING BY, ANOTHER LOADING AT MI. RIH FOR CLEANOUT RUN. CIRC THROUGH BIT AT 0.3 BPM WHILE RIH. TIE-IN DEPTH, SWITCH TO CIRC DOWN THE KILL LINE WHILE TIEING IN. CORRECT+7 FT. 03/14/11 13:50 15:35 RIH, PUMP THROUGH BIT 1.56/0 BPM. LEAVE WELL OPEN TO WATCH FOR RETURNS. ECD AROUND 8.5-8.9 WHILE RIH. NO RETURNS SEEN. AT 11840 TRICKLE OF RETURNS IS SEEN. HOLE IS CLEAN ON THE WAY IN, ONLY SLIGHT WEIGHT BOBBLES SEEN. TAG AT 12413 FT. OFFICIAL TD FOR THE WELL. 03/14/11 15:35 19:15 POOH. GETTING ABOUT 0.25 BPM RETURNS ON THE WAY OUT. 11970 FT 1.58/0.36 BPM. RETURNS ON THE WAY OUT BETWEEN 0.2-0.4 BPM. 03/14/11 19:15 19:30 PJSM FOR UD BHA. 03/14/11 19:30 20:15 TAG UP AT SURFACE AND LID BHA#11. BIT GRADED 2-3. 4 BROKEN CUTTERS, EXCESSIVE WEAR ON THE NOSE AND RUNG OUT. ALL FURTHER REPORTS UNDER CON EVENT. 03/14/11 20:15 22:30 CIRC. ACROSS THE TOP TO MAINTAIN HOLE FILL. STATIC LOSSES OF 60 BPH. DISCUSS PLAN FORWARD W/ODE AND FIELD SUPT. 22:30- PLAN FORWARD APPROVED FOR RUNNING AND SETTING IBP. 03/14/11 22:30 0:00 PJSM FOR P/U INJ. AND INSTALLING CHECKS. INSTALL UQC CHECKS. AND BEGIN TO PT. BOT ARRIVES ON LOCATION AT 22:45. STATIC LOSSES HAVE SLOWED TO 50 BPH. 03/15/11 0:00 1:00 PT CHECKS TO 250 PSI LOW/ 1500 PSI HIGH. CONTINUE CIRC. HOLE ACROSS THE TOP. 03/15/11 1:00 1:15 BRING BOT EQUIPMENT UP BEAVER SLIDE AND PREP FLOOR FOR RUNNING IBP ASSEMBLY. WELL: S-01 C Operations Summary Rep Page 11 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/15/11 1:15 1:45 PJSM FOR M/U AND RUNNING IBP. DISCUSS PROCEDURES, WELL CONTROL, AND DROPPED OBJECTS. 03/15/11 1:45 2:30 M/U IBP RUNNING ASSEMBLY CONSISTING OF 2-3/8" STL BULLNOSE GUIDE SHOE, 4 JTS 2-3/8" STL L-80, OPEN HOLE IBP, HYD. RUNNING TOOL AND SCREEN SUB CROSSED OVER TO 2-3/8" COILTRAK TOOLS. BHA OAL= 181.94 FT. 03/15/11 2:30 4:30 RIH W/OPEN EDC PUMPI-NGAT MIN RATE @ 1060 PSI. CONTINUE CIRC. ACROSS THE TOP TO KEEP HOLE FULL. WT. CHECK AT 9500 FT= 34K#. 03/15/11 4:30 4:50 LOG GR TIE-IN AND MAKE-20 FT CORRECTION. 03/15/11 4:50 5:45 CONTINUE RIH W/ IBP. 0.3 BPM AT 850 PSI CIRC. DYNAMIC LOSSES-45 BPH WHILE RIH. 2-4K#SET DOWNS AT 11312 FT, 11430 FT, 12050 FT, 12115 FT, 12185 FT, 12240 FT AND 12385 FT. P/U'S CLEAN. 03/15/11 5:45 6:30 TAG MULT. TIMES AT 12400 FT. HARD BOTTOM. P/U TO NEUTRAL WT. AND LINE UP TO PUMP FP. PUMP 10 BBLS TO FP COIL. 03/15/11 6:30 9:00 CLOSE EDC AND SHUT-IN WELL. BHT= 164 DEG F. ALLOW DOWNHOLE TEMPS TO STABILIZE. FILL HOLE DOWN BACKSIDE TO MAINTAIN SUFFICIENT BHP. BHT= 202 DEG F. PRESSURE UP AND SET IBP AS PER BAKER REP. 03/15/11 9:00 13:00 POOH W/IBP SETTING BHA. CIRC. OUT DIESEL FP. IBP HOLDING W/NO LOSSES 161° SEEN. 03/15/11 13:00 13:30 PJSM FOR L/D BHA. L/D IBP SETTING BHA AND INSPECT TOOL FOR PROPER FUNCTIONING. 03/15/11 13:30 17:30 PJSM FOR PUMPING SLACK. PUMP 238 FT. OF SLACK OUT EXPECTING 258 FT. BOOT E-LINE. REMOVE CTC AND RE-HEAD BTT. PULL TEST AND PT BTT CTC TO 25K#AND 4000 PSI. DRIFT COIL W/3/4" BALL AND RECOVER SAME. 03/15/11 17:30 18:00 PJSM FOR M/U LINER. 03/15/11 18:00 18:45 M/U SHOE TRACK CONSISTING OF BULL PLUG, 1 JT 2-3/8" L-80, PORTED SUB, 2 FLOAT COLLARS, PUP JT, LANDING COLLAR, PUP JT, AND STAGE COLLAR. P/U 1 JT. OF 2-3/8" LINER. HOLD KWT DRILL. 03/15/11 18:45 19:15 CREW CHANGE-OUT. PJSM FOR CONTINUE M/U AND RUNNING LINER. 03/15/11 19:15 23:00 M/U REMAINING 87 JTS OF 2-3/8" LINER. FILL HOLE EVERY 30 JTS. 20:00- HELD KWT DRILL. 03/15/11 23:00 0:00 M/U DEPLOYMENT SLEEVE AND SELBRT W/4 JTS OF 2-1/16" PH6. P/U INJECTOR AND STAB ON. LINER + BHA OAL=2996.03 FT. 03/16/11 0:00 1:30 RIH W/LINER. OAL=2996.03 FT. PUMP AT MIN RATE DOWN THRU LINER. 03/16/11 1:30 2:30 STOP AT 1ST EOP FLAG AND MAKE-24 FT. CORRECTION. WT CHECK AT 9600 FT 35K. CONTINUE RIH W/LINER. WORK THRU TROUBLE SPOTS AT 11400', 11698', AND 12056'. 03/16/11 2:30 3:30 TAG UP HARD AT 12129 FT MULL TIME$. STACKING UP TO-10K SURFACE WT. VERIFY TALLY IS CORRECT AND ALL PIPE RAN IN THE HOLE AND LEFT OUT ACCOUNTED FOR. CALL TOWN ODE TO DISCUSS AND TALK W/GEO. DECIDE TO PUMP PILL AROUND IN ATTEMPT TO WORK PAST. 03/16/11 3:30 4:15 PUPM 20 BBL LO-VIS PILL AROUND. SET DOWN AT 12129 FT AND P/U TO PLACE LINER IN TENSION. W/ 10 BBLS ON THE BACKSIDE P/U AND ATTEMTP TO RIH PAST 12129 FT W/O SUCCESS. SWEEP ALL THE WAY AROUND AND STILL NO LUCK. 03/16/11 4:15 4:30 P/U AND PULLING SLIGHTLY HEAVY. UP WT=45K P/U TO BALL DROP DEPTH AND LAUNCH 5/8" BALL. 03/16/11 4:30 4:45 CIRC. BALL TO SEAT. SET 10K DOWN ON LINER. SLOW DOWN TO 0.5 BPM AT 70% CT VOLUME. BALL ON SEAT AT 30.4 BBLS. PRESSURE UP TO 3900 PSI AND SHEAR BALL SEAT. P/U AND CONFIRM LINER IS FREE. NEW UP WT= 32K. SET 10K BACK DOWN. 03/16/11 4:45 7:30 SWAP WELL OVER TO 2% KCL. 03/16/11 7:30 8:30 SPOT AND RU CEMENTERS 03/16/11 8:30 12:00 DISCUSSION ABOUT PUMPING CMT OR TRYING TO GET LINER FURTHER DOWNHOLE - WOO FROM TOWN WELL: S-01 C Operations Summary Rep, Page 12 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/16/11 12:00 12:30 ORDERS RECEIVED TO CEMENT LINER IN PLACE -MEETING TO DISCUSS CHANGES TO ORIGINAL PLAN AND CONTINGENCIES 03/16/11 12:30 13:45 PJSM FOR CMT JOB- BATCH CMT AND FILL PITS WITH BIO- PRESSURE TEST LINES TO 6000# 03/16/11 13:45 14:07 SEND KCL TO CEMENTERS 03/16/11 14:07 14:18 ZERO MM AND PUMP 11 BBLS OF 15.8PPG CEMENT DOWN_COIL 03/16/11 14:18 14:50 DISPLACE CEMENT WITH 49.1 BBLS OF 2#BIO , 03/16/11 14:50 15:05 UNSTING AND AND EXHAUST 2BBLS CMT AND 3 BBLS BIO @1.2 BPM/ 1340# L 03/16/11 15:05 15:15 STING BACK INTO SELBRT AND PSI UP TO 3000#TO LAUNCH LINER WIPER PLUG 03/16/11 15:15 15:22 BUMP PLUG @10.4 BBLS AND CHECK FLOATS- HOLDING OK- ESTIMATE 6.5 BBLS OF CMT BEHIND PIPE 03/16/11 15:22 17:15 START POOH W/COIL AND LINER RUNNING TOOLS 03/16/11 17:15 20:15 UNSTAB INJECTOR HEAD. LD LINER RUNNING BHA. 03/16/11 20:15 20:45 HOLD PJSM ON MU CLEAN OUT BHA. DISCUSS POSITIONS OF PEOPLE, WELL CONTROL CONSIDERATIONS, HANDLING 1" CS HYDRIL WORKSTRING 03/16/11 20:45 0:00 MU 1.75" CLEAN OUT BHA. BHA CONSISTS OF 1_75" DSM. 1-7/8" MOTOR, 1/2" CIRC SUB, 5/8" HYDRAULIC DISCONNECT, 96-JTS OF 1"CS HYDRIL, 3/4" HI LOAD DISCONNECT, DUAL BPV, 2-JTS OF 2-1/16" CS HYDRIL. BREAK CIRCULATION EVERY 16-STDS OF 1"WORKSTRING. 03/17/11 0:00 1:00 CONTINUE TO MU CLEAN OUT BHA. OAL= 3035.83' BREAK CIRCULATION EVERY 16- STDS OF 1"CS HYDRIL. 03/17/11 1:00 2:00 MU CLEAN OUT BHA TO COIL. PU INJECTOR HEAD AND STAB ON. RIH WITH CLEAN OUT BHA TO 9200'. WHILE RIH, CIRCULATE AT .4-BPM WITH 870-PSI WITH FULL RETURNS. 03/17/11 2:00 3:00 OBTAIN PARAMETERS PRIOR TO ENTERING 2-3/8" LINER TOP. PU WT=28K-LBS, SO WT= 12K-LBS. SPRS AT .5-BPM = 1255-PSI, AT 1-BPM = 3250-PSI. WHILE CIRCULATING, CEMENT CONTAMINATED RETURNS SEEN AT SURFACE. PARK COIL AND TAKE RETURNS OUTSIDE UNTIL CLEAN. DUMP 54-BBLS OF CEMENT CONTAMINATED FLUID. 03/17/11 3:00 3:30 CONTINUE RIH AFTER RETURNS CLEAN UP TO 8.5-PPG KCL. WORK MILL AT LINER TOP TO ENSURE CLEAN. PASS THROUGH LINER TOP 3 TIMES WITHOUT ISSUE. 03/17/11 3:30 5:30 CONTINUE TO RIH WITH CLEAN OUT BHA, WASHING DOWN AT 1-BPM WITH 3530-PSI AND FULL RETURNS. PERFORM PERIODIC WEIGHT CHECKS. TAG PBTD AT 12,111' UNCORRECTED. 03/17/11 5:30 6:00 POH WITH CLEAN OUT BHA. 03/17/11 6:00 10:30 LAY DOWN BHA 03/17/11 10:30 12:00 PJSM & FLUSH STACK W/SWIZZLE ASSEMBLY 03/17/11 12:00 12:30 FUNCTION TEST BOPE 03/17/11 12:30 13:30 PJSM W/MEMORY LOGGER & PU LOGGING TOOLS CONSISTING OF SCMT/ PBMS- BHA 03/17/11 13:30 16:30 RIH W/ 1"CSH & BHA 03/17/11 16:30 17:00 M/U LOGGING CONNECTOR/STAB INJECTOR AND TIH W/COIL 03/17/11 17:00 18:45 TIH W/MEMORY LOGGING TOOLS AT 60 FPM. 03/17/11 18:45 20:25 RIH TO 12080 FT AND BEGIN LOGGING UP AT 30 FPM. 0.5 BPM AT 960 PSI. 03/17/11 20:25 21:45 RBIH TO PBTD FROM 9050 FT AT 50 FPM. 03/17/11 21:45 22:30 PUMP PERF PILL TO PORTED SUB AT 1-BPM WITH 3750-PSI. 03/17/11 22:30 0:00 POH, LOGGING UP FROM 12,080'TO 9050' AT 30-FPM. FLAG COIL AT 8900' UNCORRECTED EOP LAY IN PERF PILL AT.3-BPM WITH 500-PSI WHILE POH. 03/18/11 0:00 0:20 CONTINUE TO POH, LOGGING UP WITH MEMORY SCMT/GR/CCL TO 9050'AT 30-FPM CONTINUE TO LAY IN PERF PILL AT.3-BPM WITH 500-PSI. 03/18/11 0:20 1:30 POH AT 100-FPM WITH MEMORY LOGGING TOOLS FROM 9050'TO 3057' CIRCULATE AT .6-BPM WITH 970-PSI WHILE POH. WELL: S-01 C Operations Summary Re.. Page 13 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/18/11 1:30 5:00 UNSTAB INJECTOR AND SET BACK POH, STANDING BACK 1" CS HYDRIL WORKSTRING IN DERRICK. LD SCMT/GR/CCL LOGGING TOOLS. 03/18/11 5:00 5:30 SCHLUMBERGER BEGIN TO DOWNLOAD AND PREPARE LOGGING DATA. CLEAR RIG FLOOR & PREPARE FOR LINER LAP TEST 03/18/11 5:30 7:00 TEST LINER LAP TO 300-PSI FOR 5-MINUTES AND 2400-PSI FOR 30-MINUTES-HIGH PRESSURE TEST FAILED- DROPPED FROM 2400 TO 2290 IN 6 MINUTES, PSI BACK UP TO 2555, LOST 323 PSI IN 15 MINUTES - CHART BOTH TESTS - PLAN TO SET LTP AFTER PERFORATING. SCHLUMBERGER CONTINUE TO PREPARE MEMORY LOG DATA. 03/18/11 7:00 7:15 PJSM TO LOAD PERFORATING GUNS INTO PIPE SHED-SEND MEMORY LOG DATA TO TOWN FOR PERF ADJUSTMENTS. 03/18/11 7:15 10:15 LOAD PERF GUNS IN PIPE SHED AND LAY OUT BASED ON REVISED PERFORATING DEPTHS. 03/18/11 10:15 15:15 M/U PERFORATING BHA W/20 STANDS 1" CSH WORKSTRING, 1023.35 FT OF LOADED GUNS, AND 779.07 FT OF BLANKS. BHA OAL = 3121.13 FT. 03/18/11 15:15 15:45 PICK UP INJECTOR AND STAB. 03/18/11 15:45 17:10 RIH W/PERFORATING BHA. WT CHECK AT 9200 FT=28K. 03/18/11 17:10 17:30 TIE-IN TO CORRECTED EOP FLAG AND MAKE-10 FT. CORRECTION. 03/18/11 17:30 17:45 CONTINUE RIH AND TAG CORRECTED PBTD @ 12102 FT. P/U TO GET ON DEPTH. UP WT= 34K. 03/18/11 17:45 18:15 PARK COIL AT 12086.4 FT AND BEGIN FIRING SEQUENCE. NO INDICATION OF GUNS FIRING. PRESSURES WERE SLOW TO BLEED OFF MOST LIKELY CAUSE OF GUNS NOT SEEING FIRING COMMAND. 03/18/11 18:15 18:30 BEGIN SECOND FIRING COMMAND SEQUENCE. AT END OF FIRING SEQUENCE BEGIN PUH SLOWLY AND GUNS FIRE ON DEPTH AT 12084.5 FT. PERFORATE INTERVALS 10290' 1071_r0'3_.1u14,52-12030'. 12060'-12083.35'. GOOD INDICATION SEEN AT SURFACE AS OUT RATE DROPPED OFF AND 10K OVERPULL SEEN. 03/18/11 18:30 20:00 BEGIN POOH AT 30 FPM W/FIRED GUNS HOLDING 100 PSI WHP. TAKES-3BBL TO CATCH RETURNS. 1.0/0.8 BPM IN/OUT AT 3200 PSI W/SLIGHT LOSSES. 03/18/11 20:00 20:15 PUH ABOVE TOL AND PARK AT 9200 FT. SHUT DOWN PUMPS AND BLEED OFF WHP. FLOW CHECK WELL-CONFIRM NO FLOW. 03/18/11 20:15 21:15 CONTINUE POOH W/PERF GUNS. 1.02/0.64 BPM @ 2800 PSI. 03/18/11 21:15 21:45 PJSM FOR UD BHA AND STANDING BACK 1" CSH. TAG STRIPPER AND SHUT DOWN PUMPS. FLOW CHECK WELL AT SURFACE-CONFIRM NO FLOW. 03/18/11 21:45 23:30 BREAK OFF INJ. AND STAND BACK. UD PERFORATING BHA STANDING BACK 20 STANDS OF 1' CSH. 03/18/11 23:30 0:00 W/ 1 STAND CSH REMAINING HOLD KWT DRILL. PJSM W/SLB PERFORATORS FOR UD GUNS. 03/19/11 0:00 0:15 CONTINUE PJSM W/SLB PERFORATORS FOR L/D GUNS. 03/19/11 0:15 6:30 STAND BACK LAST STAND OF 1" CSH. R/U TO UD PERF GUNS. UD TOTAL OF 85 LOADED AND BLANK GUNS. GUNS HAVE HOLES AND ALL SHOTS FIRED. RD PERF GUN HANDLING EQUIPMENT AND OFFLOAD SPENT GUNS. 03/19/11 6:30 6:45 PJSM FOR P/U CLEAN OUT BHA 03/19/11 6:45 7:15 CHANGE OUT DIES IN LITTLE JERK TONGS 03/19/11 7:15 8:00 MU CLEAN OUT BHA CONSISTING OF 3.79 DSM, 2 1/8" BAKER EXTREME MTR, 3.5" STABILIZER, 1/2" BALL CIRC SUB, HI-LOAD DISC. 3/4" BALL, DUAL BPV, 1 1/2" MT X 2 1/16"CSH XO, 2 JT 2 1/16 CSH, CSH X 5P BOX XO, UQC, CTC -STAB INJECTOR 03/19/11 8:00 9:20 WHILE RIH W/CLEAN OUT BHA @ 7100', PUMPING .7BPM/880 PSI- PRESSURE DROPPED FROM 880#-500#FOR NO REASON - IN/OUT 1/1 03/19/11 9:20 9:40 CONTINUE TO SLOWLY TIH TO GLM#4 @ 7139 X TAG SOLID W/NO MOTOR WORK- DECIDE TO TOH TO EXAMINE BHA 03/19/11 9:40 10:30 TOH TO COIL CONNECTOR WELL: S-01 C Operations Summary Rep Page 14 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/19/11 10:30 11:30 PJSM TO LAY DOWN BHA- LAY DOWN DHA& FIND THAT BHA CAME UNSCREWED AT BOTTOM OF 2 1/16" CSH X 1 1/2" MT XO-LEFT DUAL BPV, HI-LOAD DISC, CIRC SUB, STABILIZER, MTR, XO, & DSM IN HOLE 03/19/11 11:30 13:30 MAKE NOTIFICATION TO ODE, OPS SUPT-CALL FOR AND WAIT ON TOOLS TO RECOVER FISH 03/19/11 13:30 14:00 PJSM AND P/U FISHING TOOLS- BOWEN 150 OVERSHOT W/2.13 BASKET GRAPPLE, HI LOAD DISC 1/2" BALL, BOWEN BI-DIRECTIONAL JAR, DUAL BPV, 2 3/8" REG X 1 1/2"MT XO, 1 1/2" MTX 2 1/16"CSH XO, 2 1/16CSH, 2 1/16"CSH X 5PBOX XO, UQC, CTC 03/19/11 14:00 15:30 TAG FISH @ 7146 - PUMP PSI INCREASED LIKE PUMPING THROUGH MOTOR, BACK OFF PUMP, PICK UP W/SLIGHT OVERPULL AND WT GAIN - FISH LATCHED 03/19/11 15:30 17:00 POH W/FISH PUMPING ACROSS THE TOP OF HOLE. 03/19/11 17:00 17:45 AT SURFACE AND FISH RECOVERED. L/D SAME. 03/19/11 17:45 19:15 PJSM FOR CUTTING COIL AND PREPPING FOR NEW CTC. CUT 10 FT OF COIL TO REMOVE FLAT SPOT AND INSPECT ADDITIONAL 20 FT TO ENSURE GOOD. BOOT E- LINE AND PREP END OF COIL. WAIT FOR BOT TOOLS AND 2-7/8" MOTOR TO BE BROUGHT TO LOCATION. 03/19/11 19:15 20:15 BOT TOOLS ARRIVE ON LOCATION. M/U BOT EXTERNAL CTC. 03/19/11 20:15 21:15 PJSM FOR M/U C/O BHA. M/U C/O BHA CONSISTING OF 2 JTS 2-3/8" PH6, DUAL BPV, BI-DIR. JARS, 1/2" HYD. DISCONNECT, 5K CIRC. SUB, 2-7/8" MOTOR, AND 3.79" DSM. BHA OAL= 87.91 FT. BLOW DOWN KILL LINE. 03/19/11 21:15 22:45 RIH W/3.79"C/O BHA AT 100 FPM. 0.33 BPM/350 PSI. SLOW DOWN TO 20 FPM RUNNING THRU JEWELRY. 03/19/11 22:45 23:30 UP WT. @ 7100 FT=24K#. CONTINUE RIH. TAG AT 7157 FT. AND SEE-200 PSI MW. P/U AND INCREASE RATE TO 2.43 BPM @ 3240 PSI FS. RBIH AND TAG AT 7157' AGAIN. PUMP PRESSURE INCREASED IMMEDIATELY TO 4000-PSI. P/U AND DISCUSS SITUATION. TBG TALLY INDICATES RESTRICTED ID THROUGH KBG2-LS GLMS. NOTIFY ODE AND CTD SUPT AND DECIDE TO POH. 03/19/11 23:30 0:00 POH WITH 3.79"CLEAN OUT BHA. 03/20/11 0:00 0:45 CONTINUE TO POH WITH 3.79"CLEAN-OUT BHA. 03/20/11 0:45 1:15 UNSTAB INJECTOR. LD 3.79" CLEAN OUT BHA. MILL IN GOOD CONDITION WITH NO EVIDENCE OF WEAR. 03/20/11 1:15 4:00 DISCUSS PLAN FORWARD WITH CTD ENGINEERING TEAM AND DECIDE TO RUN 3.7" OD DUMMY LINER TOP PACKER DRIFT. BAKER THRU TUBING BUILD DRIFT AND DRIVE TO LOCATION WHILE WAITING, CLEAN AND CLEAR RIG FLOOR AND CHANGE OUT SWABS ON MP#2 03/20/11 4:00 5:00 HOLD PJSM ON MU & RIH WITH 3.7" DRIFT BHA. MU 3.7" DRIFT BHA PER BAKER THRU TUBING BHA CONSISTS OF: 3.7"OD DUMMY LINER TOP PACKER DRIFT, RUPTURE DISK SUB, 7/8" HYDRAULIC DISCONNECT, 3-1/8"JAR, DUAL FCV, XO, 2-JTS OF 2-3/8" PH6 TUBING, XO AND 2"CTC. 03/20/11 5:00 6:00 STAB ON CT INJECTOR. RIH WITH 3.7" DRIFT BHA AT 100-FPM. PUMP ON AT .5-BPM WITH 430-PSI WHILE RIH. 03/20/11 6:00 7:00 RIH W/SLIGHT DRAG AT GLM#4-WORK UP AND DOWN AND DON'T SEE ANY SOLID TAGS-CONTINUE IN HOLE 03/20/11 7:00 8:30 TAG TOL @ 9286 UNCORRECTED - PRESSURE UP WITH GOOD INDICATION OF BTM - POH 03/20/11 8:30 10:20 LD LTP DRIFT ASSEMBLY 03/20/11 10:20 10:50 AGREE ON SPACE OUT AND MAKE UP LTP BHA CONSISTING OF: LOCATOR W/SEAL ASSEMBLY, 4' 2 7/8 PUP, 10' 2 7/8 PUP, OTIS 2.313 X NIPPLE, 10' 2 7/8 PUP 03/20/11 10:50 13:00 RIH WITH LINER TOP PACKER ASSY. 03/20/11 13:00 13:20 TAG DEPLOYMENT SLEEVE AT 9286'. PU AND CALCULATE SPACE OUT DEPTH. POSITION LTP 9232'. WELL: S-01 C Operations Summary Rep Page 15 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/20/11 13:20 14:00 PUMP 5/8" PACKER SETTING BALL. BALL LANDS WITH 25.7-BBLS PUMPED. PRESSURE UP TO 2000-PSI AND STACK 10K-LBS DOWN TO SET PACKER PER BAKER THRU TUBING. BLEED OFF PRESSURE. 03/20/11 14:00 14:45 _TEST LINER TOP PACKER. LOW PRESSURE TEST TO 265-PSI FOR 5-MINUTES. HIGH PRESSURE TEST TO 2545-PSI FOR 30-MINUTES. LOST 5-PSI OVER 30-MINUTE TEST. DISCUSS TEST RESULTS WITH CTD WTL-OK. 03/20/11 14:45 16:00 PRESSURE UP TO 4200-PSI TO DISCONNECT LINER TOP PACKER RUNNING TOOL. POH WITH LINER RUNNING TOOLS. 03/20/11 16:00 16:30 UNSTAB IN JECTOR HEAD. LD LINER TOP PACKER RUNNING TOOLS. 03/20/11 16:30 17:00 MU NOZZLE BHA AND RIH TO 2500'. 03/20/11 17:00 20:00 BEGIN EMPTYING AND CLEANING PITS. STANDBY FOR LRS PUMP TRUCK TO BE AVAILABLE. AOGCC GIVEN 24-HR NOTICE OF INITIAL BOPE TEST ON V-02. CHUCK SCHEVE REQUESTED UPDATE AT 1800-HRS ON 3/21/2011. 03/20/11 20:00 20:30 HOLD PJSM WITH LRS ON PUMPING DIESEL FREEZE PROTECTION TEST LINES TO 4000-PSI -GOOD TEST. 03/20/11 20:30 21:00 LRS PUMP 42-BBLS OF 6.8-PPG 65-DEGREE DIESEL FREEZE PROTECTION AT 1.5- BPM WITH ICP OF 1500-PSI AND FCP OF 2040-PSI. 03/20/11 21:00 21:45 POH WITH NOZZLE BHA AT 60-FPM. LAY IN DIESEL FREEZE PROTECTION AT 1-BPM WITH 1080-PSI. 03/20/11 21:45 22:00 TAG UP IN INJECTOR. CLOSE SWAB VALVE SPOT UP SLB N2 UNIT. 03/20/11 22:00 23:30 HOLD PJSM ON PICKLE AND BLOW DOWN COIL. DISCUSS FLUID SEQUENCE, MATERIAL HANDLING AND IMPORTANCE OF COMMUNICATION. PUMP 40-BBLS FRESH WATER, 12-BBLS OF CORROSION INHIBITED FRESH WATER AND 4-BBLS OF 60/40 METHANOL TO CLEAR& PICKLE COIL. N2 UNIT PREP FOR BLOW DOWN WHILE PUMPING ABOVE FLUID. 03/20/11 23:30 0:00 TEST LINES USED FOR NITROGEN BLOW DOWN TO 4000-PSI. GOOD TEST. BLOW DOWN COILED TUBING TAKING RETURNS TO RIG TIGER TANK. 40-6-BBLS OF FLUID RETURNED. FINAL PRESSURE 2200-PSI. ALLOW PRESSURE TO BLEED OFF. 03/21/11 0:00 0:40 CONTINUE TO ALLOW PRESSURE FROM N2 BLOW DOWN TO BLEED OFF TO TIGER TANK. 03/21/11 0:40 2:30 UNSTAB IN JECTOR. PREPARE COIL TO BE SPOOLED UP FOR SHIPPING. INSTALL GRAPPLE INTO COIL. SPOOL LINE ONTO DS TUGGER TO SNUB COIL AS IT IS SPOOLED ONTO REEL. PULL TEST GRAPPLE-GOOD TEST. 03/21/11 2:30 3:30 HOLD PJSM WITH RIG CREW(NORDIC &SLB), TOOLPUSHER, BP WSLs, BP CTD SUPT, NORDIC FIELD SUPT, SLB COIL CELL LEADER ON SECURING COIL FOR SHIPPING. DISCUSS DROPPED OBJECT POTENTIALS WITH SPECIAL FOCUS ON THE INSTALLATION OF THE NEW COILED TUBING SHIPPING CLAMPS. DISCUSS PERSONAL SAFETY WITH FOCUS ON COMMUNICATION AND MANAGEMENT OF CHANGE ISSUES. ALSO DISCUSS POSITIONS OF ALL PEOPLE ON THE RIG WHILE THE COIL WAS BEING SPOOLED COMPLETELY ONTO THE REEL. DISCUSS WELL CONDITIONS - FREEZE PROTECTED AND ISOLATED BY CLOSED MASTER AND SWAB VALVES. REVIEW PROCEDURE FOR PREPARING COIL FOR SHIPPING. ALL INDIVIDUALS PRESENT ACTIVELY CONTRIBUTE TO DISCUSSION. PROPER PERMITS (TOOLS AT HEIGHTS, HOT WORK)WERE COMPLETED PRIOR TO BEGINNING THE JOB. CTD SUPT APPROVES MOVING FORWARD WITH THE JOB AS DESCRIBED DURING PJSM. 03/21/11 3:30 5:00 SPOOL COIL COMPLETELY ONTO REEL. INSTALL SHIPPING BAR AND DUAL CLAMPS TO SECURE COIL TO SHIPPING BAR. CLAMPS RESTRICT FORWARD/BACK AND SIDE/SIDE MOVEMENT OF COIL. CUT EXCESS COIL TAIL FROM SPOOL. • WELL: S-01C Operations Summary Rep Page 16 of 16 Start Date: 02/28/11 End Date: 03/21/11 Rig: Nordic#2 Date From To Operation 03/21/11 5:00 5:30 HOLD AAR ON SECURING COIL FOR TRANSPORT IDENTIFY NEED FOR BUILT FOR PURPOSE U BOLT ON NEW"SIDE/SIDE" CLAMP RECOGNIZED KEVIN MCDOWELL, NEW DRILLER, ON OPERATING THE WINCH FOR THE FIRST TIME AND COMMUNICATING WITH SLB DRILLER RECOGNIZED RICH NEWMAN, SLB HAND, FOR CAREFUL IDENTIFICATION OF DROPPED OBJECT POTENTIALS AND COMMUNICATING CLEARLY WITH SLB DRILLER RECOGNIZED THAT THE ENTIRE GROUP CAME BACK TOGETHER TO PERFORM FURTHER RISK ASSESSMENT WHEN THE EXCESS LENGTH OF THE COIL"TAIL"CREATED ADDITIONAL WORK THAT WAS NOT COVERED IN THE INITIAL PJSM 03/21/11 5:30 6:00 RD CABLE/GRAPPLE USED FOR SNUBBING AND REINSTALL INJECTOR PULL BACK CABLE ON DS TUGGER. 03/21/11 6:00 7:00 PJSM TO PU AND INSTALL LUBRICATOR AND COMPLETE JOB 03/21/11 7:00 10:30 MU TOOLS- HOLD PJSM WITH NEW CREW COMING ON -GREASE TREE - FINISH RU LUBRICATOR- FILL WITH MEOH AND PT LUBRICATOR TO 250/3500, OK- PJSM AND SET BPV-PSI TEST BPV X MASTER TO 250/3500 03/21/11 10:30 12:00 PJSM - REMOVE AND REPLACE PACK OFF - INSTALL NEW 2 3/8" BRASS 03/21/11 12:00 14:30 1/2 CREW-PJSM -OPEN DOORS AND CLEAN OUT AND INSPECT BOP RAMS- REPLACE 2 SEALS ON BLINDS AND RE-INSTALL 2 3/8" PIPE RAMS-ANNULAR LOOKS GREAT--- REST OF CREW- PJSM FOR CT REEL SWAP POSITION TRAILER AND LOWER REEL OF 2" COIL ONTO BED (77K#)AND SECURE TO TRAILER- MOVE TRUCK AND BRING IN TRAILER WITH SPOOL OF USED 2 3/8" COIL INTO POSITION (85K#), LIFT NEW SPOOL INTO POSITION AND SECURE IN REEL HOUSE 03/21/11 14:30 17:30 PJSM - ND BOPE AND COMPANION FLANGES & INSTALL TREE CAP 03/21/11 17:30 23:00 TEST TREE CAP &COMPANION FLANGE. TEST TO 250-PSI LOW AND 4000-PSI HIGH. HOLD AND CHART EACH TEST FOR 5-MINUTES. CHANGE OUT 0-RING ON TREE CAP AND TROUBLESHOOT SLIGHT LEAK-OFF ISSUES BY FUNCTIONING TREE VALVES. 03/21/11 23:00 0:00 REMOVE WORK PLATFORMS AND CONTROL LINE GUARDS. CLOSE ALL VALVES ON TREE AND SECURE WELL. TBG/IA/OA=TWC/0/0. RELEASE RIG AT 000-HRS r EM BAKER INTEQ North America - ALASKA - BP Prudhoe Bay PB S Pad S-01 S-01C Survey: MWD + IFR Survey Report - Geographic 15 March, 2011 Øbp rER BAKER Survey Report-Geographic bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 5-01 Project: Prudhoe Bay TVD Reference: S-018 @ 70.26ft(Nabors 28E) Site: PB S Pad MD Reference: S-01 B @ 70.26ft(Nabors 28E) Well: S-01 North Reference: True Wellbore: S-01C Survey Calculation Method: Minimum Curvature Design: S-01C Database: EDM .16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB S Pad,TR-12-12 Site Position: Northing: 5,980,854.54ft Latitude: 70°21'23.002 N From: Map Easting: 617,919.92ft Longitude: 149°2'32.343 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 0.90 ° Well S-01 API No 500292071700 Well Position +N/-S 0.00 ft Northing: 5,979,854.00 ft Latitude: 70°21' 13.007 N +E/-W 0.00 ft Easting: 618,919.00 ft Longitude: 149°2'3.603 W Position Uncertainty 0.00 ft Wellhead Elevation: 37.81 ft Ground Level: 37.10ft Wellbore S-01C API No 500292071703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2010 V25/2011 21.56 80.98 57,651 J Design S-01C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,737.15 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 33.16 0.00 0.00 286.39 Survey Program Date: 3/15/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 103.88 5,903.88 Survey#1 CB GYRO MS(S-01) CB-GYRO-MS Camera based gyro multishot 6,000.00 9,737.15 Survey#4 MWD(S-01 B) MWD MWD-Standard 9,785.00 12,413.00 MWD+IFR(S-01C) MWD+IFR MWD+IFR correction 3/15!2011 2:08:23PM Page 2 COMPASS 2003.16 Build 73 11671111 BAKER Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 5-01 Project: Prudhoe Bay TVD Reference: S-01B @ 70.26ft(Nabors 28E) Site: PB S Pad MD Reference: S-01 B @ 70.26ft(Nabors 28E) Well: S-01 North Reference: True Welibore: S-01C Survey Calculation Method: Minimum Curvature Design: S-01C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,737.15 41.40 315.80 8,830.26 605.16 -2,394.72 5,980,421.03 616,515.18 70°21' 18.955 N 149°3' 13.604 W TIP 9,785.00 41.09 315.26 8,866.23 627.68 -2,416.82 5,980,443.19 616,492.73 70°21'19.177 N 149°3'14.251 W KOP 9,800.26 43.89 313.86 8,877.49 634.90 -2,424.16 5,980,450.30 616,485.27 70°21'19.248 N 149°3'14.465 W 9,819.53 48.95 313.39 8,890.77 644.53 -2,434.27 5,980,459.76 616,475.01 70°21'19.342 N 149°3'14.761 W 9,835.73 54.03 312.00 8,900.85 653.12 -2,443.59 5,980,468.20 616,465.56 70°21'19.427 N 149°3'15.033 W 9,860.70 62.64 312.49 8,913.95 667.40 -2,459.30 5,980,482.22 616,449.62 70°21'19.567 N 149°3'15.493 W 9,870.46 64.50 312.34 8,918.29 673.29 -2,465.75 5,980,488.02 616,443.08 70°21'19.625 N 149°3'15.681 W 9,896.95 69.73 311.08 8,928.59 689.52 -2,483.97 5,980,503.95 616,424.61 70°21'19.785 N 149°3'16.214 W 9,925.46 74.91 310.56 8,937.24 707.27 -2,504.52 5,980,521.37 616,403.78 70°21'19.959 N 149°3'16.815 W 9,959.12 81.93 307.69 8,944.00 728.05 -2,530.09 5,980,541.74 616,377.89 70°21'20.163 N 149°3'17.563 W 9,990.13 89.57 306.70 8,946.29 746.73 -2,554.70 5,980,560.03 616,352.98 70°21'20.347 N 149°3'18.282 W 10,019.28 97.54 307.51 8,944.49 764.27 -2,577.89 5,980,577.19 616,329.52 70°21'20.519 N 149°3'18.960 W 10,054.08 101.84 304.05 8,938.63 784.32 -2,605.70 5,980,596.80 616,301.40 70°21'20.717 N 149°3'19.774 W 10,080.01 100.24 299.21 8,933.66 797.66 -2,627.37 5,980,609.80 616,279.53 70°21'20.848 N 149°3'20.407 W 10,107.68 98.53 293.15 8,929.15 809.70 -2,651.85 5,980,621.44 616,254.85 70°21'20.966 N 149°3'21.123 W 10,133.25 98.75 286.94 8,925.30 818.36 -2,675.59 5,980,629.72 616,230.98 70°21'21.051 N 149°3'21.817 W 10,165.38 98.53 279.07 8,920.47 825.50 -2,706.52 5,980,636.37 616,199.95 70°21'21.121 N 149°3'22.721 W 10,194.26 98.49 274.91 8,916.19 828.98 -2,734.86 5,980,639.40 616,171.56 70°21'21.155 N 149°3'23.550 W 10,224.03 98.78 271.36 8,911.72 830.59 -2,764.24 5,980,640.54 616,142.16 70°21'21.171 N 149°3'24.409 W 10,254.06 99.06 267.36 8,907.06 830.25 -2,793.90 5,980,639.74 616,112.51 70°21'21.168 N 149°3'25.276 W 10,284.59 99.09 262.94 8,902.24 827.71 -2,823.93 5,980,636.71 616,082.52 70°21'21.143 N 149°3'26.153 W 10,318.30 99.03 259.18 8,896.93 822.53 -2,856.81 5,980,631.02 616,049.73 70°21'21.092 N 149°3'27.114 W 10,347.14 96.49 257.50 8,893.04 816.76 -2,884.79 5,980,624.80 616,021.85 70°21'21.035 N 149°3'27.932 W 10,379.59 93.44 255.58 8,890.23 809.23 -2,916.23 5,980,616.78 615,990.54 70°21'20.960 N 149°3'28.851 W 10,410.38 91.75 251.99 8,888.84 800.65 -2,945.76 5,980,607.72 615,961.15 70°21'20.876 N 149°3'29.714 W 10,439.19 88.68 253.58 8,888.73 792.12 -2,973.27 5,980,598.76 615,933.78 70°21'20.792 N 149°3'30.519 W 10,469.19 90.58 257.49 8,888.92 784.63 -3,002.31 5,980,590.81 615,904.86 70°21'20.718 N 149°3'31.367 W 10,499.54 91.01 262.06 8,888.50 779.24 -3,032.17 5,980,584.95 615,875.10 70°21'20.665 N 149°3'32.240 W 10,528.65 90.52 266.94 8,888.11 776.45 -3,061.14 5,980,581.71 615,846.18 70°21'20.638 N 149°3'33.087 W 10,564.08 90.98 273.31 8,887.65 776.53 -3,096.54 5,980,581.22 615,810.78 70°21'20.638 N 149°3'34.122 W 10,595.16 90.89 278.53 8,887.14 779.74 -3,127.44 5,980,583.93 615,779.84 70°21'20.670 N 149°3'35.025 W 10,623.91 89.91 283.20 8,886.94 785.15 -3,155.67 5,980,588.90 615,751.53 70°21'20.723 N 149°3'35.850 W 10,653.42 89.97 288.01 8,886.97 793.09 -3,184.08 5,980,596.39 615,723.00 70°21'20.801 N 149°3'36.681 W 10,683.97 90.21 292.98 8,886.92 803.78 -3,212.69 5,980,606.62 615,694.23 70°21'20.906 N 149°3'37.517 W 10,712.48 90.09 298.09 8,886.85 816.07 -3,238.41 5,980,618.50 615,668.32 70°21'21.026 N 149°3'38.269 W 10,749.20 89.05 302.54 8,887.12 834.60 -3,270.10 5,980,636.52 615,636.34 70°21'21.208 N 149°3'39.196 W 10,779.27 88.34 300.71 8,887.81 850.36 -3,295.69 5,980,651.87 615,610.50 70°21'21.363 N 149°3'39.944 W 10,812.00 87.61 296.79 8,888.97 866.09 -3,324.37 5,980,667.14 615,581.59 70°21'21.518 N 149°3'40.783 W 10,840.74 86.31 294.09 8,890.49 878.42 -3,350.28 5,980,679.06 615,555.48 70°21'21.639 N 149°3'41.541 W 10,870.61 85.42 289.99 8,892.64 889.59 -3,377.89 5,980,689.79 615,527.70 70°21'21.749 N 149°3'42.348 W 10,900.76 85.08 286.55 8,895.14 899.01 -3,406.41 5,980,698.76 615,499.03 70°21'21.841 N 149°3'43.182 W 10,931.83 84.31 282.26 8,898.02 906.71 -3,436.37 5,980,705.98 615,468.96 70°21'21.917 N 149°3'44.058 W 10,959.56 84.04 278.65 8,900.83 911.71 -3,463.50 5,980,710.55 615,441.76 70°21'21.966 N 149°3'44.851 W 10,989.46 84.44 275.51 8,903.83 915.38 -3,493.01 5,980,713.75 615,412.19 70°21'22.002 N 149°3'45.714 W 11,014.51 85.05 271.78 8,906.13 916.96 -3,517.90 5,980,714.94 615,387.28 70°21'22.017 N 149°3'46.441 W 11,045.65 85.39 267.99 8,908.72 916.90 -3,548.93 5,980,714.38 615,356.26 70°21'22.017 N 149°3'47.348 W 11,079.57 84.78 271.31 8,911.63 916.69 -3,582.72 5,980,713.64 615,322.48 70°21'22.015 N 149°3'48.336 W 11,113.06 84.19 277.56 8,914.85 919.27 -3,615.94 5,980,715.69 615,289.23 70°21'22.040 N 149°3'49.307 W 11,145.67 85.17 282.01 8,917.88 924.79 -3,647.93 5,980,720.70 615,257.16 70°21'22.094 N 149°3'50.242 W 11,172.04 87.05 286.24 8,919.67 931.21 -3,673.43 5,980,726.71 615,231.56 70°21'22.157 N 149°3'50.988 W 11,205.46 88.31 291.45 8,921.02 941.99 -3,705.02 5,980,736.99 615,199.80 70°21'22.263 N 149°3'51.912 W 11,232.17 89.02 295.78 8,921.64 952.68 -3,729.48 5,980,747.29 615,175.18 70°21'22.368 N 149°3'52.627 W 11,260.74 89.45 300.55 8,922.03 966.16 -3,754.66 5,980,760.37 615,149.79 70°21'22.500 N 149°3'53.363 W 3/15!2011 2:08:23PM Page 3 COMPASS 2003.16 Build 73 • BAKER 11NQMES Survey Report-Geographic 0 bp LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well S-01 Project: Prudhoe Bay TVD Reference: S-01B @ 70.26ft(Nabors 28E) Site: PB S Pad MD Reference: S-01B @ 70.26ft(Nabors 28E) Well: S-01 North Reference: True Wellbore: S-01C Survey Calculation Method: Minimum Curvature Design: S-01C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,292.45 89.11 305.13 8,922.42 983.35 -3,781.29 5,980,777.13 615,122.89 70°21'22.669 N 149°3'54.142 W 11,326.40 89.75 310.69 8,922.76 1,004.21 -3,808.07 5,980,797.55 615,095.79 70°21'22.874 N 149°3'54.925 W 11,356.34 90.89 314.82 8,922.59 1,024.53 -3,830.05 5,980,817.52 615,073.50 70°21'23.074 N 149°3'55.568 W 11,384.21 88.71 310.99 8,922.69 1,043.49 -3,850.46 5,980,836.16 615,052.79 70°21'23.260 N 149°3'56.165 W 11,411.84 89.72 308.63 8,923.07 1,061.18 -3,871.68 5,980,853.51 615,031.29 70°21'23.434 N 149°3'56.785 W 11,440.51 90.61 304.94 8,922.99 1,078.35 -3,894.63 5,980,870.31 615,008.07 70°21'23.603 N 149°3'57.457 W 11,471.06 89.17 301.96 8,923.05 1,095.18 -3,920.12 5,980,886.73 614,982.32 70°21'23.768 N 149°3'58.202 W 11,506.22 91.44 298.64 8,922.86 1,112.92 -3,950.47 5,980,903.98 614,951.70 70°21'23.943 N 149°3'59.089 W 11,537.67 91.29 295.75 8,922.11 1,127.29 -3,978.43 5,980,917.91 614,923.51 70°21'24.084 N 149°3'59.907 W 11,566.76 92.64 293.00 8,921.11 1,139.28 -4,004.91 5,980,929.48 614,896.85 70°21'24.202 N 149°4'0.681 W 11,605.92 94.36 289.69 8,918.72 1,153.51 -4,041.31 5,980,943.12 614,860.23 70°21'24.341 N 149°4'1.746 W 11,632.67 92.27 287.91 8,917.17 1,162.11 -4,066.59 5,980,951.33 614,834.82 70°21'24.426 N 149°4'2.485 W 11,662.38 91.56 284.45 8,916.18 1,170.39 -4,095.10 5,980,959.15 614,806.18 70°21'24.507 N 149°4'3.318 W 11,692.41 92.73 281.01 8,915.06 1,177.00 -4,124.37 5,980,965.29 614,776.82 70°21'24.572 N 149°4'4.174 W 11,728.09 92.70 277.07 8,913.37 1,182.60 -4,159.56 5,980,970.33 614,741.55 70°21'24.627 N 149°4'5.203 W 11,757.82 92.82 273.73 8,911.93 1,185.39 -4,189.12 5,980,972.65 614,711.95 70°21'24.654 N 149°4'6.067 W 11,786.57 92.76 277.63 8,910.53 1,188.23 -4,217.69 5,980,975.04 614,683.34 70°21'24.682 N 149°4'6.902 W- 11,817.62 93.25 282.57 8,908.91 1,193.67 -4,248.20 5,980,979.99 614,652.74 70°21'24.735 N 149°4'7.795 W 11,845.89 92.46 286.54 8,907.50 1,200.76 -4,275.53 5,980,986.65 614,625.31 70°21'24.805 N 149°4'8.593 W 11,877.05 93.62 290.26 8,905.84 1,210.58 -4,305.05 5,980,996.00 614,595.64 70°21'24.901 N 149°4'9.457 W 11,907.78 93.35 294.48 8,903.97 1,222.25 -4,333.41 5,981,007.22 614,567.11 70°21'25.016 N 149°4'10.286 W 11,937.81 92.52 299.80 8,902.44 1,235.93 -4,360.08 5,981,020.47 614,540.22 70°21'25.150 N 149°4'11.066 W 11,967.46 93.04 304.03 8,901.00 1,251.58 -4,385.22 5,981,035.72 614,514.84 70°21'25.304 N 149°4'11.801 W 11,996.11 93.62 308.51 8,899.33 1,268.50 -4,408.27 5,981,052.27 614,491.52 70°21'25.470 N 149°4'12.475 W 12,028.89 92.91 313.14 8,897.46 1,289.89 -4,433.03 5,981,073.26 614,466.43 70°21'25.680 N 149°4'13.199 W 12,054.82 94.51 310.79 8,895.79 1,307.19 -4,452.27 5,981,090.25 614,446.92 70°21'25.850 N 149°4'13.762 W 12,081.44 92.86 306.67 8,894.07 1,323.80 -4,472.98 5,981,106.53 614,425.94 70°21'26.014 N 149°4'14.368 W 12,109.49 90.58 303.24 8,893.23 1,339.86 -4,495.96 5,981,122.23 614,402.72 70°21'26.171 N 149°4'15.040 W 12,140.12 88.59 298.22 8,893.45 1,355.51 -4,522.28 5,981,137.45 614,376.16 70°21'26.325 N 149°4'15.810 W 12,169.31 87.48 294.85 8,894.46 1,368.54 -4,548.37 5,981,150.06 614,349.86 70°21'26.453 N 149°4'16.573 W 12,198.26 86.00 290.84 8,896.10 1,379.76 -4,575.00 5,981,160.86 614,323.06 70°21'26.563 N 149°4'17.352 W 12,232.76 86.83 285.31 8,898.26 1,390.44 -4,607.72 5,981,171.01 614,290.18 70°21'26.668 N 149°4' 18.308 W 12,263.17 87.11 280.74 8,899.87 1,397.28 -4,637.30 5,981,177.39 614,260.50 70°21'26.735 N 149°4' 19.173 W 12,294.56 88.31 276.15 8,901.13 1,401.88 -4,668.32 5,981,181.50 614,229.41 70°21'26.780 N 149°4'20.080 W 12,323.17 88.56 272.56 8,901.91 1,404.06 -4,696.83 5,981,183.22 614,200.87 70°21'26.802 N 149°4'20.914 W 12,357.55 88.16 272.09 8,902.89 1,405.45 -4,731.17 5,981,184.06 614,166.52 70°21'26.815 N 149°4'21.917 W 12,413.00 88.16 272.09 8,904.67 1,407.47 -4,786.55 5,981,185.21 614,111.12 70°21'26.835 N 149°4'23.537 W TD-2 3/8" 3/152011 2:08:23PM Page 4 COMPASS 2003.16 Build 73 WELLHEAD= McEVOY SO I C SAFETY NOTES: ACTUATOR= OTIS KB.ELEV= 66.38' BF.ELEV= 37.81' KOP= 3004' PJC DRAFT I 2181' H4-1/2"HES HXO SSSV NIP, ID=3.813" I Max Angle= 47°@ 5904' Datum MD= 9790' 1 2596' H 9-5/8"DV PKR I Datum TVD= 8800'SS 13-3/8"CSG, 72#,L-80 BUTT, ID= 12.347" H 2694' , GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"X 7"TIEBACK LNR, ID=7.50" H 5840' 1-1 6 3002 2999 10 MMG DOME RK 16 03/28/11 9 5/8"X 7"BKR LTP 5848' 5 5575 5042 47 MMG SO RK 5 03/28/11 w/HMC LNR HGR, ID=6.187" 4 7139 6381 2 KBG2-LS DMY BK 0 01/15/96 3 7820 7062 0 KBG2-LS DMY BK 0 10/15/10 TOP OF CEMENT 5986' I 2 8542 7784 1 KBG2-LS DMY BK 0 01/15/96 1 9268 8475 36 KBG2-LS DMY BK 0 10/15/10 MILLOUT WINDOW(S-01 B) 5995'-6045' 9-5/8"CSG,47#, L-80, ID=8.681" H —6045 9232' I-14-1/2"BKR KB LNR TOP PKR, ID=2.37"(03/20/11) Minimum ID = 2.75" @ 9542' 9247' 1-12-7/8"OTIS X NIP, ID=2.313" 3-1/2" HES X NIPPLE 9263' 1-13-1/2"DEPLOY SLV, ID=3.00" I 9268' H3-1/2"X 3"LNR XO, ID=2.70" I 9269' —{3"DEPLOY SLV, ID=1.780" I 4-1/2"TBG, 12.6#, L-80 BTC-MOD, H 9492' I— / 9492' 1H4-1/2"X 3-1/2"XO, ID=2.992" I .0152 bpf, ID=3.958" • 9503' 1-13-1/2"HES X NIP, ID=2.750" I 9517' H7"X 4-1/2"BKR S-3 PKR w /ANCHOR, ID=3.00" " 1 9521' 1H4-1/2"X 3-1/2"X0, ID=2.992" I Iii 9542' I-13-1/2"HES X NIP, ID=2.750" I 9562' 1-13-1/2" HES XN NIP MILLED TO 2.74"(02/06/11) I CEMENT(TAGGED 02/07/11) H 9560' I • '' 3-1/2"TBG,9.3#,L-80 EUE 8RD. 9575' ., • • 0087 bpf, ID=2.992" 9574' H 3-1/2"W/LEG, IS=2.992" I WHIPSTOCK(03/04/11) H 9784' `�•. II* 9572' ELMD TT LOGGED 06/23/96 • ►• • 7"CSG,29#, L-80 BTC-M, .0383 bpf, ID=6.184" H —9790 ,, •• 3.80" MILLOUT WINDOW(S-01 C) 9786'-9790' PERFORATION SUMMARY ••�•�•�•'•• ••••• REF LOG:???? •••••••••••j ••••• ANGLE AT TOP PERF:99'@ 10290' ••••••••••• ••••• Note: Refer to Production DB for historical pert data •••••• ••••j•j•••j PBTD 12089' SIZE SPF INTERVAL Opn/Sqz DATE -•-•-•-•,....4 1.56" 6 10290- 10710 0 03/18/11 70'r';0;1 1.56" 6 11450- 12030 0 03/18/11 ''lt'0.'1'tit 1.56" 6 12060- 12083 0 03/18/11 2-3/8"LNR,4.6#, L-80 STL, .0039 bpf, ID= 1.992" H 12129' I -• (6P DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT a 1982 ORIGINAL COMPLETION WELL: S-01C 12)`V" 01/17/96 N28E SIDETRACK(S-01 B) PERMIT No:'2101440 03/21/11 NORDIC 2 CTD SIDETRACK(S-01C) API No: 50-029-20717-03 04/04/11 PJC DRLG DRAFT CORRECTIONS SEC 35,T12N,R12E, 1692'FNL&767'FWL RP FYnInratinn (Alaska! bp Date 05-12-2011 Transmittal Number:93192 ,,,,,,, BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA FIELD LOG DATA) If you have any questions, please contact_Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 15-11CP61 ago 16,3 gag((0,94' 18-13C 410-1154' y� ' A-39A (9.10- /to- l-1(75.8 F-28B @to-ic g igCO29 S-01C a.10-r`-/4 J'-i(3° S-18B 'a t o-Oc3 l “"tc S-129 S-129PB1 j S-129P62 X 10_(3 a. /4(0 3a °--Please ' and Return one copy of this transmittal Thank You, Doug Dortch Petrotechnical Data Center t ',' i i. d'1 Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E.Benson Blvd.PO Box 196612 Anchorage,AK 99519-6612 1 II 1°-°fP V D D N D 0;o yr 'n Nd "to ^° mD �:�: a2 miom __ n,o3O C o m 0 < °O�° NNao«r<G«�°'G1n => m or JC N N „. . .,m 6 7 N 01 9 V H 7C y Qp m z N N _> -N N N N+N N a N p w m0-0 y O w m->0 0 3 g,-1 u D N O m o D m y m m m y m» c umt a0x� 1.Nio tO 4 7 m p m m a °e m m m m mmmmmDmmmmmmmmmmmmmmmmmmm a' I -a 0 m r 3 m s 0 0 m r 0 D D 0 0 m r r,r,-r D m m m 1 m m a L y c N M a c C D m m M m O m O V c XX c.. m m 10 OD _y m7.O2LLL m7000-(010DD ° '< o ° °°8° 0°o°S°°$°°°°o O°°o° v N O°OaiIy-1°°A.4V r°m° okimNrT°°O 0 N O V w+A V.V N W V-,W M N +M W V N W a a M 3 O 3 N v 2 3 3 0 3 r 3 3 z 3 2 3 3 0 3 3 2 x mrmc>ze_mmmmamm,mLmmmmr rr--mmLO D 3 N 3 3 0 m 3 3 r 3 r 3 3 m 3 m 3 3 r 3 to 3 3 4 0 z 100_ 0_0__ 00 0 r 9 c1z° v zzlzlzz 0 m91c 0 0 0-r_m m 4-c--r_-mL m O00 1 m r 0 -°mr 0 mmomZmm r.-0001 m 0 - 0 cam,0ozOz00 00z- 1 ■c 0,-+ c 11a1m11 .flccm0 _,4,0 Zpo. 0qsooAoxoomi '.p2,2,pZ ,Dopo,A°9 ,ov„mvmm, Ol oomo z zC70m0 .. oorzroo��'zzr� o i2 r! zloom0 oo � Im,AZmm r q �m mCm �;∎1mmCmrmm^�sOOG" o v ° .++ m�i"'1°.`� my .d CC 1� mmE"�-. n o G q�.CL .� �ntai A a� ' 3 v . ....... - .0.............. 1 W W W W==t W .....u t a W"W W W W W W 0 N N N N N N++ O N++-O+.N+N 0 0 0++ p1 O 10 4 .Li W w O V. O)W+1O W O N V 10 m O a m 0 0• V l/rig r W RI tt�� �C us - O P o 0 W. d$ 1 uNC 0 - .0. 0 ° » -•D co°0 '.7.40: Z t=om co C) N O C H J 2-4 N . . 0 O °0 3 3 1 0 a N co sifor [E a D SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU S-01 C BP Exploration (Alaska), Inc. Permit No: 210-144 Surface Location: 1629' FNL, 4523' FEL, SEC. 35, T12N, R12E, UM Bottomhole Location: 116' FNL, 4245' FEL, SEC. 34, T12N, R12E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. incerely, Daniel T. Seamount, Jr. J S Chair DATED this / day of October, 2010. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA ! ALA; OIL AND GAS CONSERVATION COME' ON ` `�EN - 0�9/0 PERMIT TO DRILL ;FF 2 2 2010 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: �i1" rf�eiflli ion ®Development Oil CI -Winj 0 Zone �•� „ ❑ Drill ®Redrill ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone Coalbq i_Q Gas Hydrates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp FHMntG: hale Gas 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU S-01C 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12650' TVD 8840'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028257&028258 1629'FNL,4523'FEL, SEC. 35,T12N, R12E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 994'FNL, 1668'FEL,SEC.34,T12N, R12E, UM November 1,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 116'FNL,4245'FEL,SEC.34,T12N, R12E, UM 2560 5407' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 70.26 feet 15.Distance to Nearest Well Open Surface: x- 618919 y-5979854 Zone- ASP4 GL Elevation above MSL: 37.10 feet to Same Pool: 108' 16.Deviated Wells: Kickoff Depth: 9821 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 100 degrees Downhole: 3475 Surface: 2595 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 3" 2-3/8" 4.6# L-80 STL 3095' 9550' 8691' 12650' 8840' 75.80 cu ft Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 10149' 914Q' None 10040' 9058' None Casing Length Size Cement Volume 1 MD ND Conductor/Structural 110' 20"x 30" 8 cu vds concrete 110' 110' Surface 2694' 13-3/8" 3720 cu ft Arctic Set II 2694' 2693' Intermediate 5995' 9-5/8" 1558 cu ft Class'G'. 130 cu ft Arctic Set I 5995' 5328' Production Liner 4309' 7" 906 cu ft Class'G' 5840'-10149' 5222'-9140' Perforation Depth MD(ft): 9630'-9914' Perforation Depth ND(ft): 8750'-8963' 20.Attachments: ❑ Property Plat ®BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ® Diverter Sketch ❑Seabed Report ®Drilling Fluid Program 1E120 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: ______ 22. I hereby certify that the foregoing is true and correct. Contact Wilmer Hoffman,564-4592 Printed Name J., uga .,. Title En ineering Team Leader Prepared By Name/Number Signat "' Phone 564-4711 Date jr'A/4 ^ Elizabeth Barker,564-4628 Commission Use Only Permit o Drill API Number: Permi Appr va Date: See cover letter for Number: o2l40/ 50-029-20717-03-00 1 01 1 J J 0 other requirements Conditions of Approval: If box is checked,well may_not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: l rf 35-06 s` 8O P I eS 1 Samples Req'd:Other. i� P q' : Dyes liNo Mud Log Req'd: ❑yes ErNo 2_500 tsz 4 n 1 es46k.;..)H2S Measures: �(Yes ❑No Directional Survey Req'd: Vir Yes ❑No 4//21// 5 APPROVED BY THE COMMISSION [' Date ,COMMISSIONER Form 10-401 d This permit is valid r 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate ORIGINAL 1..3o /J��l ,/x# S-01 C - Coiled Tubing Drilling To: Chairperson Alaska Oil & Gas Conservation Commission b y From: Wilmer Hoffman CTD Engineer Date: September 9, 2010 Re: S-01 C Application for Permit to Drill Request CTD Drill and Complete S-01C program: Spud in November 1, 2010 Pre-Rig Work: (scheduled to begin October 1, 2010) 1. S Caliper tubing. Dummy off GLVs. Drift with dummy whipstock. 2. F MIT-IA to 3,000 psi. MIT-OA to 2,000 psi. 3. W PPPOT-T. Torque LDS. 4. C Mill XN Nipple at 9,562' to 2.75". Set 10 bbl, 17 ppg cement plug in 7". 5. V Set TWC. Test Tree and valves. Pull TWC. 6. 0 Bleed wellhead pressures down to zero. 7. 0 Bleed production flow lines and GL lines down to zero and blind flange 8. 0 Remove wellhouse, level pad Rig Work: (scheduled to begin around November 1, 2010) i°iA 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Drill 2.74"pilot hole from top of cement at 9,700' down to 9,830'. 3. Run dummy whipstock drift. Set 2-5/8" OH anchor whipstock at 9,800'. 4. Mill 2.74"window at 9,800' and 10' of rathole in Zone 4. 5. Drill Build: 3" OH, 385' (31 deg/100 planned) • . 6. Drill Lateral: 3" OH, 2,460' (12 deg/100 planned) with resistivity • '0, 7. Run 2-3/8", L-80 liner leaving TOL at 9,550' • r e) J) 8. Pump primary cement leaving TOC at 9,700', 2 bb . of 15.8 ppg liner cmt planned. 9. Cleanout run inside liner. 7 14 Irgc-$ 10. Run GR/CCL log. 11. Test liner lap to 2,000 psi. 12. Perforate liner per asset instructions (-1,200') 13. Set liner top packer 14. Freeze protect well, set BPV, RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Generic GLV's 3. Test separator 9 September 2010 S-01 C — Coiled Tubing Drilling Mud Program: • Milling/drilling: 8.6 ppg Power-vis or biozan for milling, new Power-vis for drilling • Swap to seawater/brine if losses encountered Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. , • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" Casing Program: • 2-3/8", 4.6#, L-80, STL solid 9,550' MD - 12,650' MD / • A minimum of 13.5 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,700'MD) • Cement top is planned for outside the window to preserve Sag perf production in parent along with future sidetrack option Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 100 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line— 5,407' • Distance to nearest well within pool — 108' (S-44) Anticollision Summary • S-44 center to center distance: 109' status: producer • S-44L1 center to center distance: 227' status: producer • S-44L1 PB1 center to center distance: 167' status: plugback Logging • Resistivity, MWD directional and Gamma Ray will be run over all of the open hole section. • A cased hole GR/CCL log will be run. Hazards • The maximum recorded H2S level on S-Pad is 300 ppm on well S-201 (02-06-2010). • Lost circulation risk is high at fault crossing. o One fault crossing expected at 11,130' Reservoir Pressure • Reservoir pressure is estimated to be 3,475 psi at 8,800'ss (7.6 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,595 psi. Wilmer Hoffman hoffmawj@bp.com CTD Engineer 13 September 2010 S-01 C — Coiled Tubing Drilling TREE- 4"CMY S 01 C WELLHEAD P:kEVOY ACTUATOR- BAKER SAFETY NOTES: KB.ELEV= 66.38 Proposed CTD Sidetrack BF.ELEV= 37.81' - KOP- 3004' , 2181' 1-I4':2"HES HXO SSSV NIP.ID-3.8'3" ( Eha x Angle- 47 a 5904' VIM Dalun NO- 9790' Dater ND- 8800'SS = m 2596' —I4 5'8"DV FKR '3-378"CSG.120.L-80.D-'2.34r -I 2694' I---, GAS LFTMANDRELS Illr (ST ND ND DEV TYFE VLV LATCH FORT DATE 6 3002 2999 '0 16L1G DOME RK '6 57'9706 Minimum ID= 2.635" @ 9562' 5 5575 5037 41 Nt K3 DONE RK '6 57'9706 3-112"HES XN NIPPLE 4 7139 6381 38 KBG2-LS DKW BK 0 ' 3 7820 7062 33 KBG2-LS DONE BK '6 57'9706 2 8542 7784 27 KBG2-LS DMY BK 0 ' _9268 8474_ 2' KBG2-LS SO BK 22 57'9706 TOP OF 7"LNR — 5840' 2 3 5848' HBAKERZXPPKR I • • TOP OF CEMENT - 5986' I I ' ktiLOUT WINDOW 1, 'I' 5995'-6045' 9-578"CSG.478.L-80.ID-8.68'" — 5995' •.4 11 , 141.11 9492' H4-'72"X 3-'172"XO( 111111 O1�1� \ •• 9503' H 3-'12"HES X NIP.D=2.750• I jljljlj111/ 4i 9517' 1-17-X 3-'12"BKRSAB-L FKR'N!ANCHOR I 111111111111* Ili ■•••••••11111 9542' 1-13-'72`HES X NIP.ID-2 1 I 111111111111111 9550' H3-1/2-BKR KB LIP,D=t.ls• I___ 1 1 1 1 1.1 4 1 4 1 0 1 1 1 1 9562' H 3-'72"HES XN NIP.D 111111111 111111111 1111111111 9574' 3-'72"W LEG 1111111111 /1/11111111 111111111111111111111 , 1 9572' I--1 ELMD TT LOGGED`36723+96 I 1111111111111111111111 I I-� 9700' r !1.1.11�11,�r11!,a� --__ 9700' ( roc i■ I ( n plot hale,--( 9801' 41" !I 4.6#,1-80. OU39 opt,ID=1 941" 12645' TOP OF CEK•ENT — 9737' tirvivirttmt 1 11 11 1 11 1 1 11 1 1111111 11 PERFORATION SUMMARY 1111111111111111111111 11111111111 REF LOG:DIR ON 0'1'2;96 11111111111 ANGLE AT TOP PERF:4' 11111111111 11111111111 /11 1 1 1 11•11 1 1111 111 11 11 Note:Refer to Production DB for historical perf data X111111111111111111111 SIZE SPF INTERVAL Opn7Syc DATE p1111111111111111111: PBTD 10040' 2' 8 9630•9670 O 02+2?:56 1111111111) •1�1 11111111111 .1'11/11 3-378" 6 9802-9832 0 0';'5,96 1111111111111111111111 t�/1/1/111/1/1/tt. 2' 6 9832-9857 0 057'0709 1111111111111111111111 '$∎441'1• l 2' 6 9866-9886 0 05711 709 1111111111111111111111 1 11 1 1 1 11 1 1 111 11 11 111 11 2" 6 9894-99 14 0 05.1'709 11111111111 11111111111 X111111111/1/1/1/1/111 I7LNR.298.L-ao.Brc r.1oD.0.037' Spr.ID 6.'84" 10149' 04•4•00•444 1 1 1 1 1 1 1 1 1 1) 9-5..8"CSG.478,LOU.- D-8.68'" — 10098' 4464446444I DATE REV BY COMMENTS DATE REV BY CONVENTS PRLOHOE BAY UNIT 1982 ORIGINAL COMPLETION WELL: S-01 0117;96 SIDETRACK COMPLETION PERMIT No: 33722706 DAV7PJC GLV GO API No: 50-029-20717-0 057'9706 RCT.PJC GLV GO SEC 35.T12N R12E 05/3';U9 RRDTLH PERES(057"709: 04:017'0 MSE PROPOSED CTD SIDETRACK BP Exploration(Alaska)• 9 September 2010 I S-01 C - Coiled Tubing Drilling TREE= 4"CIW WELLHEAD= McEVOY ACTUATOR= BAKER _O 4 D SAFETY NOTES: KB I .ELEY- 66 38' BF.B-EV= 37.81' MaxPAngle= 47 @ 5904' • 1 2101' H4-112"HES HX0 SSSV NIP,ID=3.813" I Datum MD= 9790' Datum TVD= 8800'SS 2599' H9-518"DV FKR 13-318"CSG,728,L-80,ID=12.347" —1 2994' I-4 i GAS L FT MANDRELS VL ST MD TVD DEV TYPE VLV LATCH FORT DATE 6' 3002 2999 10 I./M3 DOME RK 16 5/19/06 Minimum ID = 2.635"e 9562' 5 5575 5037 47 NM DOME RK 16 5/19/06 3-1/2" HES XN NIPPLE 4 7139 6381 38 KBG2-LS DMY BK 0 3 7820 7062 33 KBG2-LS DOME BK 16 5/19/06 2 8542 7784 27 KBG2-LS DMY BK 0 1 9268 8474 21 KBG2-LS SO BK 22 5/19/06 TOP OF7"LNR -1 5040' t _i ; 5040' HBAKERZXPPKR 'TOP OF CEIvENT H 3969' MLL OUT WINDOW 5995'-6045' 9-518"CSG,47#,L-80,ID=8.681" H 5903' I , , 9492' H4-112"X 3-1/T XO I PA .. 9503' H 3-1/2"HES X NIP,ID=2.750" I 95W H7"X 3-1/2"BKR.SAB-L FKR W/ANCHOR I 9542' H3-1/2"HES X NIP,ID=2.750" I 9592' H 3-112"HES XN NIP,ID=2.635" I ({{;, 9574' 3-112"WILEG 9572' —I ELMD TT LOGGED 06/23/96 I ¢SV 6230' ' ` TOP OF CEMENT 9737' ` I H PERFORATION SUMMARY Il REF LOG:DFL ON 01/12/96 ANGLE AT TOP PERF:41©9894' Note:Refer Production DB for historical pert data ` SCE SFF NTERVAL Opn/Sg2 DATE 2" 6 9894-9914 0 05/11/09 'r:fi;:rb: 2" 6 9866-9886 0 05/11/09 „;'�,".�(% -:TD 10040' 2" 6 9832-9857 0 05/10/09 3-3/8" 6 9802-9832 0 01/15/96 2" 8 9630-9670 0 02/21/96 7"LNR,298,L-80,BTC-MOD,0.0371 bpf,ID=6.184" -1 1014r I O SIR"f`CG A741 I Rn in-R ARV. H 10°90' .•'••••'•'••••••'•••'•. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 111112 ORIGINAL COMPLETION WELL: S-01B 01!17841 411OETRACK COMPLETION PERMIT No: 195-2020 03/22/06 DAV/PJC GLV 010 API No: 50-029-20717-02 05/19/06 RCT/PJC GLV C/0 SEC 35.T12N,R12E 05/31/09 RRD/TLH FERFS(05/11/09) BP Exploration(Alaska) 9 September 2010 . N 0 CO v o 0 o O N O a) 0 0 O ( W O 0 0 0 0 C O N 0 CO M 0 a s= O 0) 0) O O O O O 00 O 6 O N N- gooto CO CD c0 00 CO CP m m=W LL C F h o Z N 0) N- CO o 0 O V CO o 0) O 7 N 0) - CO N V to V N- CO N N- a r CD Q co w a a 4 6 N CO N Cn CO M 6 co N O CO CL 0 0) O O O CO v ([) M to M 7 M co Z N N Tr 4 Tr to to CD CO N. r CO 00 O O O 0 N V N N N N N N N N N N N N N N M ) a Ja D Z (13 0 m V 1 C) C i ■ M to 0 0 CO 0 CO 0 0 0 h N 0 1.- 0 0) 0 CO 0 v 0 I- W v, o o a) o o) o a) o h O) 0 0 0 I,- 0 CD 0 6) 0 a MINX h v v M O m O 0 M N 0 0 O m O O) 6) 0 N `use N 0) 0) 0) 0 CO O) ao 0 0 0 ao ao (O to 0) 0 I- r N m m m'=W tco .-- �,.) t^ O z N 10 N N CO CO Tr CO N 0) CO 0) a) CO LO N N CO V co to V co O Tr 0 CO I CO N CO tO a) CO CO N V CO CO ( W W D CO 4 a) M 0 M co CO 0 co M I- M N- N CO tO CO CO 0 0 0 0) CD O if) O) CO 0 O) CO CD CO 0 I- 0 N. 0 0 ,- N N CO CO Tr 1' 00 CO CO N I-- CO CO O 0) 0) 0 0 0 iL3 in- y m M M CO M M M M M M M M M M M M M M M Ti V 0 0 N ZZ m m > = m CD CO CO CO N N CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 co O O O O O co O O O O O O 0 O O co O O O O O N N N N N N N N N N N N N N N N N N N N 0�i ©© E 00 .- v/ m m E• N m 0 To j ,= 0 0 -. co u) it w L. aj co CO CO Cr) 1. CO LO N V 0) N 0 V R N 0 0 CO CO O 'Si 0 0 (0 (3) LC) CO N Tr CO CO Tr (3) LO CO N- V 0 CO 0 O p 0 N 1` CO N O N- 0 (O tO N N o) 7 O) N- tO N V a) 0 0 O 0 N 6) V 6) 0 0 N LO N 0 CO LO V CO tO 0' w 0 CO 0 I- 1,- CO CO LC) tO 1' V CO CO N N N 0 0 Cr) a) m lC') 0 tO tO 0 0 to- tO lO 0 0 0 lO tO C!) CC) tli lO Ti V 0 co co CO CO CO co CO 0 0 CO CO 0 Cl- CO CO CD 0 0 co c co r O W D C C• m) m 3 m e t.' V O CO N M tO CO 0 7 N CO o) 0 O 0) M 0 CO ` w to 41 7 co co co CO M CO 0) CO CO O CO N- 1,- N- LO CO M t V• m w 1Z A ay O) CNO COO 10 CO N- 00) N a COO 0 M CCO n 000 0 V V c0 000 O re t m .0 C t0 it" to U) LO 0 (O (O CD CD h h Is- N N- CO CO 0 0 0 • V 0 0 t 0°0 co 0 a°o co 000 co co O0 000 000 co co co O0 co co W co co co J r2 Z to G C" Q) Cr) Cr) 0 0 O) a) a) 6) 6) o) Q) Q) co 0 0) O) 0 0 O) Z tCi tri tci tri to tri tri td t[i t[) ui tci u tri tri tci A in' tri to w• 0) .E Z N v co v N 0 CO r CO 0 N n CD 6) O) N- CO CO LO v V co CO O) to 4 N CO 0) 0 I- CO CO CO N 0 N- 0 0 M 0 vi 0 CO (D 0) O O) 0) N �7 O) 0 tO 0 V 0 N N Q) N CO 0 - 0 0 LX) O) N- 7 LO M V O 0 ,— ,— N N CO CO V sT LC) LC) CO CD CO h 0 CO a) O) -C d M -.5' M M M M M M M (h -.5 M M M (h M I Z Cn L N . 0) 0 to co CO V CO CO N N CO h M C) CO CO O) O) CO N � in co N 0 CO � � Cr) M Q) � 0 N � 0 0 t1) CO N el- CU 0 Ti r) 0 N co _O co N N a) 0 0 h O N 0 Co CO ItO tO to t0 N. 0 N V CO 0 V I- I- CO O V tO 0) a) p) L ▪ n 0 CO CO 0 Cr) O) O) 6) o) O O O O O Co 43 (0 Cl. Z as m co 0 to o) 6) 1- 0 CO CO CO N- CO 0) CO a) O O CO 0 0 N CO CO 0 O) 01 M• d' CO CO r CO O O O N 7 t 0 tO h UC N V C0 a) N M V V CO N CO V 7 7 0 10 t0 tO CO 0 0 CO CO CO CO CO CO CO CO CO CO CO 0 CO CO CO 0 00 0 co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 > H - tO (NI co O co N CO V 0) 0 N CD N r 7 N 0 N CO CO M CO CO 0 LO 0) CO N- I` CD 0 V CO CO 0) CO LO . . - M tO V U) 0) 0 - CO CO I� 0 CO M N N O O N CO CD r 0 CO 0) 0) 0 0) 0 0 0 0 CO CO Cr) 0 0 0 0 N N N N N N N N N M M N N N N N CO CO N N O- M 1 CO r R 0 CO CO tO _0 0) N CO 1� V V 0 u) O Q O N CO CO CO CO 0 CO a) N 0 0 (O CD t` O O CO O O o) CO co Co U) 06 h V C') V 7 CO n N- r CC) O O al a) co ao co co co co co co oo co a) co a) 0o co 0) 0) T Em 0 C" Q o a O J) tn O 2 co O 0 0 c N CO z n a co a s co 0 0 co 0 co 0 co 0 o co o co 0 co 0 co 0 0 0 v tri o o v o o o o v o tri o v o tri o o v o o 1.6 o v o to o v o 'Li o v o to o v o ri o o ID 0 0 0 r co 0 0 V 0 0 N 0 N. O N 0 0 0 0 0 N 7 tO CO CO N- r CO CO O) 0 0 N N CO M V V 0 T N O O O O O 0 0 C O O r O a— 1 N M r a r a-- �- O^ 0 � :.; p C d * CO O)� r � � r r 0 o d o o) o E 2 ..- m m wm to N c� am33o a , . M O 0) CD V CD N- O O CO CO 0 CD O o) h N O W h O '- CO O CO 0 V' ,- O M (O O O O N u) O O U N= N O O O O O O OI h h N.: (O O of ao C` O m`Wo h 9; 9' 9' a) a) rn rn CD a) 0) 9' CO CO 0o a) h. m Z I- O cO N CO V• 'R CO h N- LO 0) N o) h co N- N- CO (O 0 M h co . co O co (O (f) co o) h N O ,- O h co N CO N Q UJ W O O ci M Q) M CO N (D Cj O to h N a 7 N h O 0- N N 0 h O O O O O O co O h CO N- N- h N- N 0 N N CO V et CA CD O h co co co O O ' ' N N m V V V' R -t V V R V (c) (c) u7 V OO 0 n N�' CO ( N > Z Z (D CO 1? (n N N CO O 0 O 0 O CD 0 0 CD CD CD CD O CD O O O O O O O D ,- 0 O O O O O O O O O O O (D 0 O O O O O • /Ch-���h U Ni N N N N N N N N N N N N N N N N N N N co F Ch m m E N m C 3 9 9 2 C 0 CI ir- aj M 00 co to CD N V co co co N O CO N CO CO CO O :0 N- N o) .• Tr N (O 0) W V to N O O t0 aD M O C h (A M o) O (P (O • N.: M N CO 4 V O (O N o` h CO h (O CO V O) 0) O 0) O N- M R C CO o)t OD C a0 CO h N CO CO (A V V M M N N N ,- O o) o) CO r R- CO (O (O O CO CO CO CO CO (D (D CD CO CO CO (D (D (O (O a.m. C m . @ W :0 C 0 m 3 m V h (N co co CO O O CO N Cp h CO 7 M O) CO CO w l0 co h CO O O (O M 7 l0 CO (D M CO M CD CO CD co O .d 41 m O y h 7 a O) o) (A V N (- CO N CO R h h U) to an t () m 4- IX >w c0 p) N M h h O N to CO CO 0) CO V CO CO M N- OD O CO (5 O Cr) O O O O O O O O ,- r- .- N N N N N CL V c t O O O O o 0 3 is m co 0o co co aO co 0o co co co a0 Co co co co 0o co co /Y J Z M 0 p O o) o) o) m O) (P o) (A o) O) O) o) o) a) O) Q) O) o) VV Z (n CC) (Ci U) (A (1) (n U) CCi vi (ii (n (n CI) Cci (C') CP) (A (1) W a I- E Z a0 co V (0 CA - N U) O R CO CO CO (O in O h CO (A O V O N- 0 0 N CO M O o) O N (A h N N co CA R (D h O Co M O V (D o) M N Ln V on (6 U) N co N v N (A CD CD CO O 0) N h CO CO (O (A u) O W O O N N M v v_ to (A CO CO (O h CO o) o) 0 = C7 g- v v . v ' r v v v v v v i- v v v i (r) 0) W 7 Z = Z N L d L CO M CO (O (.i 0) h . co M o) V V O O -IC a) V O co O N CO CO V' .- N O (A o) M N O CO o) CO (C') CO h (O (O N o) a0 co CO CO 4 O o) O 6 O 7 Cq co -a 00 0) N M CO 0) CD U) CO O O O Cr) an N N N N M CO CO M V V U') 117 O, (0 CO m C o) M to CO a0 (A 4 V CO N- Tr CO Q) h R CD CO CO ✓ a O O N (A CO N h O .- o) h O O) o) a co o) Ti: . • O M h (O CO C7 O co h O O to h h o) O to CO CO CO CO M N N N N N M CO CO CO y O CO CO CO aD ao aD ao ao CO CO CO ao ao CD ro CO CO CO G N CO CO CO CO aO CO 00 O CO CO O 00 CO O O CO CO CO I- 0) V N CO N O M V M M O N (O CO N CO N (O (O CO O O M M O h CO O CO Tr O O O CO h N O CO (O (O co N- V O O h CO h l0 Ni N h O CD CO CO CO CD CA 00 h CO 0) O CD O CO CO h N- h M M N N N M N N N N N M M M N N N N N CO ..C Cn (A (A d (A CD CO O) 0) N (O Co O co CD h CO _ Q h h CO CO LOU) V N N CO 0 CO V V' h O O M 0) CO CO 0) CO M M CO N O O (O O O (D h h h T 0) o) o) o) CO CO 0) 0) o) 0) 0) 0) CO CO M O CO CO CO . O E m 0 C (+f Q O 0. O N L _ O O co C C O O 2 m 9 CO N a Z O 0_ co a s co CD CD CO CD CO CD CD CO O O CO O CO CD O O CO O v O O v 0 v O 0 v O O v, O v O O 0 v O a m (O CO O O (A O CD O (O CD M O O (A O O co O O to O co co O (O CD co O O O in CD CD CD O O N in a. Ch ID C 3 o r CO h h CO CO 0) O O N N M CO in CO CO O CO A O Z' r r CN (N (N a- .- N O C) y 2 .... s- r (%1 N O l0 "' C Q V d co n C2 .m. m d) ,m N N c)a �n33o . rn . W n N. a E NO (N ( () ( m' �=O v co (N CO coo co N co wi rn n o Un r-: co o ,- co co co Z .0 't 7 V ('7 N) M ON J ,- V 7 7,- Q W W .0 0 N N N y a`) Z Z Z Z Z Z Z 0 .0 0a co 03 CO a ZZ a) 0 V co CO n CO n 9 N co N N N N N O C w _ _ N CO CO J N N N N N N N 7 aN /aN C.� Cvy O O O O O O O N. O ©© E O thmm CV d .E g 0 O o 0 0 0 0 0 0 0 0 0 0 0 o 0 O O o 0 T.) ` E o O o 0 • o O o 0 0 0 0 O O O O o O o O co co H f W o UO CO Cfl v UO CV O ui M o Ln ao co o O UO Cn UO CA N Co M N ,- CO Cn O CO N Cn M W O O CO co 0) N Co N N N CO CO V LO M P O LO CO CO CO r` O) Co M co M V M M CO CO CO CO CO c6 CO UO V M M M M 4 UO CO C 0 co Co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO C -o co ` L W w tli co 2 cc co o o co a) 0 0 0 00000000000 0 00 0 0 0 C • pia o O O o O O o 0 0 0 0 o O O o 0 0 0 0 0 C •0 ; , 0 O CO CO N CO O co CO M O CO CO N N O N cci 0 O CO N N CA Co CO CD CO CO CO V 0) 0) O CO LO 0 9 ` d y C1 CO .- N N V CO LO CO O O CO .- V O O CO CO CO M To - al w d N o y C M W C>D O C) C) 6 C) 6 COO 000 CO (O co 0 co co o 0 O V a> _ea a co rn co rn or) co CA co 0 0 (A co rn C) co co rn cm C) rn le o U) Uri Uri Uri Uci Uri U) CC) U) ui ui ui Uri 1. CC) Uri co" 1. 0. vG � .�+ o W a I— 'C Z c co co N N co UO CO CA Tr N CO CO N CO CO CO CO LO CO LO N N N O) CA N Co in co CO N N CO O UO CO CO V UO 7 O La M O O V M co M O N N o O UO N N N IV rg O N ,- CO A V CO N V N CO 0 0 0 M CO Co • W O CO ,- N CO V M CO N M M O CO CO .- O O CO W CC) + • Un j CO M N N N N N M M V to n Lll n n C. C.) N • Z W Cl) a W N N W W 6 W O) N CO co N M CO CO NCO N CO _ CO N 0) _ _ CO CA N CA CO 0) CO N N I N CO CO G) L N o CO a v v v V CO 0) CO f` CO n v CO M y CO. O) .Ni n CA O) C) O O m N CO CO M M M m CO N U) V CA N CA CO co Co O n 4 CO Cl)_ co co co CO CO CO CO N CO m n N 7 Co N CO O ,- Cb CA CO 0 CO CO 0 lO co V Z V CO CO CC) CO CO CO 00 CO CO Cfl co_;Z 0 C.) N M NCO m = z �Z �� �� N N a Y o o O O Z o Z (0 V CO V . N r` CO CO `- n O CC) m o C.) CO CO,- Co❑ CO CO CO CO CO CO CO CO CO CO CO Co❑ CO (o CO Oo CON CO CO N 0 N N> N N N N N N N N N N N N> N N N N D N O> co❑ O~ 0 0 0 0 0 0 0 0 0 0 0 O~ 0 0 CO❑ O> 6 0 rn,_. o> N NO r` N N N N N N N N N I I`NO N P CV CO 1- m> ‘Cm- F I- rn I- O� co 0 N o 07 ON co co O N CO co 0 o M CO Co oo CO CO N j CA CO — N CO . CO CO ❑ ❑ O 00 CA CO❑ 2 M °o CO ❑ g ❑ x v ❑ g ❑ 00''C o02 0000 0000 002 00= 002 ▪ Op o4 Op OO •occo orr� o,- 6 in°'`� o M s- ' co 0 a v d N N O O co N_ 0 c0 ,- 0 Q m @ co o "iii 19 CU co o� o 00 0 o oN 0= 00 OCO OM o . OC`') OCO OM J N 0 ca O N 0 0 0 oo 0 co 0 0 up up Q U >, a CU CU CU CU N CI) N N@ U 6 C C C c C C C Xi Q O Q,• O U C) a) C) a) a) U L CO CO N CU ; N d N .t -0 c c m m 07 07 07 07 o 2 co O CO CO N .0. co co o co :0 Y6 Z /.� z a a a s CA N N N 0 y- N to co co ` ) r N N CO N C N N co V CO CO r co (P .- N N CO N N y N rh N y .N N 0N C C C C C C C C C C C C U.co C C C .co •N N— M E w d o f o E„ >,E m o 0 0 0 0 0 0 0 0 0 0 E O7o '0 o f o7 E o7 E `, o a 0 co c c `m C,C o c >,a a a a a a a a IL IL a m C 0 a ca C C m c.0 Co c H CU 0 � ca 0 a m o Imo I-. o F- m 0 H m a o • a) :69 a t N O as U a� Uad Vas Uad 0 ad 0 • o 0 C m L c o • d d y o 0 0 0 0 0 0 c.) Co3 3 0 CO (.1)01 n 0) co Cl) cn co co mi a o 6 N N- to v-4x W N M v m Z M V V U) co io O co 7 V V V - co W W 0 Z CO c0 N N Z z z z z z 0 N N U CO CO W co M CO Z Z N O) ao M to N 7 C N N N N CEO CO fa • _ __ _ _ _ N N Z CO N N N N N N 0o 7 U � 0 0 b o O O o@)© E ch 03 „' a) _ 2 co o o O oo00 0 C) 0000 O 0 0 0 0 0 00. N O O ` C ❑ o o o O 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 3 co Ch H W r` n O a) N a) O Cn v CO O co 4 a) 4 co CO CO co CO CO N CO N CO R C O CO CO CO CD N N N N- N V CO CO CO ,- CO N N N C°) N N CO CO M M .- M C) CO CO CO CO CO V' M V CO Ln U) 1f) CO lO lf) CO CO CO 4 a') V Cn N CO M CO M CO CO CO CO CD CO O CO CO CD CO G. CO CO CO CO CO CD C) C O t. L rd. a) f rt O C .." O co O O co O O O O O O O O O O 0 0 0 0 0 0 0 0 C0 l�0 co O O O co co O O co O co 0 0 0 O 0 0 co 0 0 0 0 'cocoon C V 4 O) CD Cfl CO a) CO U) a0 co N M N CO O O CO V CO 7 CO co O O a) O CO N V' V' CO N- U) CO 7 V a) Co M CO a) 4 ` d N t7 V V a) a) a) Cn 0 If) CO O O N- CO N. N. N N CO CO V CO M 03 O w W m V y 000 W aa) co W CO OW a0 CO 000 W CO 0 03 131 aa)ci a00 CO 0 W CO co O co O o V r d a C rn C 0) C) rn C) C) C) C) Q) 0 CO Q) C) rn D) a) co a) rn co U) ui 10 C<i a u'i co- Ifi Cri Iri 1.6 cri Iri Cn Iri C<i Cci Cri Cri Iri cri Cn a) t10i o o r Z V. u7 R JFfZu o W I— 'E Z c N N r CO O N- N C) CO O CO CO CO aO CO CO .- M CO N 0_ co O CO — co CO M CO CO CO CO CO 1O co 1` 1- N m D) N C') (') e— N N N CO aO a0 O CO a) V N- O r CD e-y '.cr V 1� 7 V CO N CO CO CO CO 0 CO O V 1) CO a0 0) N- D) a0 S w .- CO M r N M CD CO O CO CO CO N N CO Cn N- CO CO Cn N (i. N M M V Cf) V C') c.-.>2 N) M M M M (. • Z W 7 co W 2 M co v a) co L.• a) • V' N. 0 O CD CO CO CO CO M O M a) O a) CO M M CD N- N N. CO N N N N 61 M O V CO 4 CO N O N N CO O O co co O -V 0) 4 V 7 V M M u') r` CD h a N M N Cr) cD u) O V O C) N C+) co C O a)N a) N O O O M 0 N to Cn to h CO CO N N N CA CO 61 a0 0) 0 M = CO Z tO Z CO N 00 CO N Z 01 O) lO C) CA V Z �t lO CO CO_ CO CO CO Y.1 N la CO Y C C) CO N M N- op M CO CO CO CO CO CO CO❑ CO CO CD CO CO Cfl❑ CO CO CO CO CD CD CO CO CO CO CO CO N; N N N� N N N N N N� N CNN N N N� N N N N N N CO 1- O O O O C7 0 0 CD O 0 0 0 0 CO O 0 0 0 0 0 0 N N N- 1` N-M T r N. r a) N-CV N- n N- T m N-N 1` h N- N- N. N Ui CO O M CO O co CO N- CO CO t- oo co CO CO CO CO ❑ ❑ ❑ g g ❑ O N O c0 O 00 0 O 00 o- 00 0 00 0 0� C) r- a) a) N- o co r- a rn a) m m To a To to rn 09 N f` CO fn O 00 O O C) O OO g c;co o� o o� o oco Q T T T T •c m 0 c C' c c m _ U E O U U U Q O a cn CO N N a) a) a) a) t -LO Cn C C a1 m 0 a) 0 O: o 29 as Ca r N a) co /� zaacnaa rn �, E' �, N ( ' N (Ni N N co V M @ N ,— N co V h '- N M CO CO i^f� ❑ C!) C C C m.N C C C •C ,C .N-. N C C C C .N. Q N C C C C C C C C`) e ui c m C>a s a s as c a a° a D a° a D m c C co c m a° 0- 0- a D m c c m a° a° a D CL CL n° CN 0 O LL CO O a CO ) H C6 3 a CO O 1- m O a as O .- a ° a , a 0 as V as V as V as U as U as CO d o co:; d d o 0 0 0 0 0 (N ua` cnn33o th cn v� d� J, rn a § - & LIMAS . § �� D e ■ $ 2 0 k \/ 0 00 k o \// e CV CV \ \ � m oc \ // E2 E % 99mEo § $ emu . ii o o 0 } 2 m§ d a) .. ; § n f @ | § , s e ` g 9aWI -• o -o 412 Q).0 0 a 't II co co _. i_ g2 , \a zo _�W E § ' Zc � o — 2 0_ s 2 o ¥ 32 13 . 0 ® ■ G \ CO 1 a 0 § z \ d \ \ \ okE / C) < 00 ccdn < » co » \o � \/) _ /{ ! 1 ; £/ \\ r » ) 3 § § ` o ~ - J § E ¥ EE k \ a ID w \ h .. li o f o j /kkkk 0 § § W Muse O' (0 W m I., 0 N 0) Cn W W Q. N co co N ❑ N M U) o O `O U sa S2 Z Z d o) CO CO N N N Z O O O 3 hi aN-`�N-` O N O-i ©© E O 0 th m m (N N O O 7 C a cocoH W❑ cm) c O m z .� a) • 2 CC I d c O c u •0 ` a,• c o 9 d m C t >O C - , (0 t d O cli W C I. E Z m N N co CD Q ❑ ❑ DI L o O = to a) a)N O T W a) ❑ ❑ m ■ C) cy M ,) RS E M _ o O W O d O O c O N Cr) V O O N CO O O N M ❑ p_ 2 .15 V H Y W W O P co O N N N N H d (9 Q m O M (0 0) N (0 M d N 00 h N O O) M CO CO 0) N V M O CO O M N 1s- CO O M f,- 4 O M h M N h CO O h O M 0 0 0 0 M N M O M O 0) co O 0) 0) CO 7 V M cci O M O 0 N N M O') N N O 0 co 0 O CO 03 0) 0 V O M N CO 0 0 4 M V O O I� CO 0 � N M O 0 0 O 0) 0 � N V CO co O O a 4-N N N N N N N M r) M M M M M M M sf sr sr sf sf v v l0 c to O O co 0) ,- Co to sr co O CO M N I- Co N- 0 (0 CO Co 0) I- 0) 0 0 To N ,- 1-- M O co V' C N CO V O O f,- O CO 4 O M ,- O M O CO o• (/) M C'') v uus 0)) N 000 LU COO 00) (Si 0 N- 000 v 00)) M 0) M 0 COO 0 0 .- J . -O CO CO N- N. O N n N. 00 0) 0 0 0 0 N- .- N C+) M V Co Co Z e- t 0 CO N 0 Q Co 0) h O 0) CO M V M N- N. N 4 0 4 0 0 CO 4 0 (/) O M O N- CO N CO N M O V N- O O r- M co O N C+) 0) (�j t O co M co O O O O N V O 00 M O M O M O si 0 0 N O I. 0) V M CO CO CO CO 00 0) N N N O 0) CO 0) O Q r m CO CO CO rn 0) 0) CO CO CO CO CO CO 0) rn CO 0 0 rn rn co co co O rn 0 N 00 00 00 06 00 00 00 00 00 06 00 00 00 00 00 00 O 00 06 0) mi. 0) a0 co o >, .c m_ U m Q O a O •O r o o V V V C v a v v a a R V a a a V V V V C OO L O U) O I .c O O O O O O O O O O Co Co O O O Co O O Co O Co O r ` p c c 3 O. 0) O N CO CO CO co co N- O V N N- N co co co co C.') M co 0 Co O m N co Ca .' ^ CO CO CO 0 M V O r- co O .- N M 4 O r- co O N M CO O n Z a a co 0 0 C d O 0 0 0 0 0 0 0 0 0 0 0 N N N N N Yf. O 5. 0) 7.. m C•i 5, jai O Np 0 a `) a O) Q U 0 a 0 .O w N 41 .N L N LS o• ` s a a 0 rn • • • y _____�_,� § W ■■■■FII■� , 5 '$Eirmritz 1, 70 n • orsonamm 1 , .„ .- IIIMMINUNIM imuninclim /zr� U\ or 1 M.NN IFIWA/A■■ m 0 dbi oQY P Np• ZiI V „ WAOV®i■ 8 m O ormairmi.I FAM/MA■■■■ `lY■ 4 '_ U AI.�AMWA ■ _ W mD .- 1111111111161■„ ■1111 8 Q O Q O Vo W o• m (LIN o0Z)(+) oN/(-)tpnoS 0 \ —en N CO a I , Q 3 0 <v^ A id• e8 2 y N o F •O C5 m $ o o t o � m c o p _ ■=-x5.r5m,-mo $ WrR NN O to U a y ° 5 uNp r° OPNM4.i ry Q b awN- 9mmn.,'SAmnnN—osm,c n U G r T p m� V4 S2""2828822882288282828822 Q °8 4 Ld ,7"1) F°m °"-NN�Si N�N�i 8'r „ �r� ' �j` �yo„S m 1awErp Z PF13i888$288 288888222$$8888 / 'S' 4 8 Pt *q -9CC �o ,.... NNNNtV”, Oin NNN.V IV / r-mm fIl p N 3 C C o• ° _ 3�in rn2if2 4m2mna�i Mi�28 X8222 ` N G z v v`u-{m N ? ,g�.V YY44 Y4 N E , o • 21p m` 523-$nm i--5ga�8$ N.°I*4,7-7, yy ;;�� �Wm m - - i `,8 N smm222222igEvEgmRia y 0 k ^ 2 �° gs8sssssss°s�ss o 1.L Z � � � N N � N N w o • 32 0« ,mmmmW mmmmmg 1 lo 3(4) _ z x_N_ m °_ _ o_N ' (WIT S8 ENKE Ie0912AaiL a T H loz gym= a A i A I § •EWA NN■■■t■E■■■ E ■E_ /.■■■■„■FINN■ ' ■�/%�■■■■//■1■■MEN ■I -,m %/ ■■M■►/;I %;uu■/ I■�I�ME■■ �.�■�01/It/ �■∎' ■■■1/1Ip/2■11/ g lid.. ■IC I,II■I�1 - oo ..I ice::,, ■■■■,. 1 `t 3v4iNy- y SP��'R 0. r"9T" ' I 1 . . , �. r U \ :12 d N rn 8g / s o m a o ^ 3 a P41F1A v __ .Wall 3 /0,0 .. °NW, •r7.- 1 ) .' , .,,, 4 —v v m m V Q ga Y,1 Alidtdi ' Ail i 1 i Y m4s aana4 Hg 3i 4. ■//WL WI■%8.. /M■■■■■■■I .g ■I/.■LI 'E'■■WA■■■■■■■■ Wmw ■i// . • 1 ; " `,..1 �� c6 0 c )(+>quoN/c->glnos 0 m Ei Ir/tll BPPASSPORT BAKER ilUR!! Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well S-01 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB S Pad MD Reference: S-01 B @ 70.26ft(Nabors 28E) Site Error: 0.00ft North Reference: True Reference Well: S-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan S-01 C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 5 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB S Pad Plan S-127-Plan S-127-Plan#3 Out of range Plan S-129 SL3-Plan S-129-Plan#9 S-129 Out of range Plan 5-129 SL3-Plan S-129PB1 -Plan#6 S-129F Out of range S-01 -S-01 -S-01 12,641.88 10,850.00 435.47 299.90 147.09 Pass-Major Risk S-01 -S-01A-S-01A 11,275.00 10,250.00 292.15 193.83 98.32 Pass-Major Risk S-01 -S-01 B-S-01 B 9,800.00 9,800.00 0.00 0.76 -0.75 FAIL-Major Risk S-03-S-03-S-03 Out of range S-15-S-15-S-15 Out of range S-16-S-16-S-16 Out of range S-17-S-17AL1 -S-17AL1 10,500.00 10,196.00 901.60 564.44 337.16 Pass-Major Risk S-17-S-17B-S-17B 10,600.00 10,375.00 942.65 559.43 383.22 Pass-Major Risk S-17-S-17C-S-17C 10,687.39 10,658.00 937.26 543.75 399.75 Pass-Major Risk S-17-S-17CPB1 -S-17CPB1 10,625.00 10,387.00 1,097.45 560.51 544.05 Pass-Major Risk S-17-S-17CPB2-S-17CPB2 10,625.00 10,380.00 1,186.34 556.52 633.34 Pass-Major Risk S-21 -S-21 -S-21 Out of range S-22-S-22-S-22 10,150.00 9,550.00 1,183.25 348.17 844.59 Pass-Major Risk S-22A-S-22A-S-22A 10,150.00 9,825.00 787.43 343.36 449.19 Pass-Major Risk S-22B-S-22B-S-22B Out of range S-23-S-23-S-23 Out of range S-24-S-24A-S-24A Out of range S-24-S-24B-S-24B Out of range S-27-S-27B-S-27B Out of range S-28-S-28A-S-28A Out of range S-28-S-28B-S-28B Out of range S-44-S-44-S-44 10,300.00 9,875.00 109.43 392.77 -282.63 FAIL-Major Risk S-44L1 -S-44L1 -S-44L1 12,088.06 11,550.00 227.92 518.27 -230.51 FAIL-Major Risk S-44L1PB1 -S-44L1 PB1 -S-44L1 PB1 10,275.00 9,825.00 167.83 396.59 -184.68 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 9/8/2010 10:56:43AM Page 3 of 26 COMPASS 2003.16 Build 71 r S-01 C — Coiled Tubing Drilling 3 ' i -11 ? -II— . • = 3 111 I• _ sa i 111 ■ E . A g l- 111 I' ra I 1 .. ' 111 �� C i i = 1 1 - ` 1 _� —nib. I I IR Q �� s tam I ; w •: .• _ Q •• I. I • • J • 1 I 11.111111111111t 1T. 1< 1 1 . 11 111 In ' >l 11 : 11 1 111 •11 111 Y 111 2 - L 1 . II II I z I O Q I.' '—.1 j♦V _ :e 111 1 i• Z I 11" Y ■ 41 • • 1111 i. t r*1 _ �, 1111=1 C 1-n o M II_ n ' v III' I. t 11 j D W _... . : in ` • W — 1 3 u s 1 III W � p III• u 4 1 1 0,64 1 (�. a rft*I I O ! 1 3 1 IIIIIIIIEi ili E"' 1 ! ' N 1 ∎- J ' :; V ✓ 1 , r— 0 1 j' (. . 1 Q : ; 1- ' -O W 111 i O I< s E. ii 0 : 1 N. 8 "1 1 1 z 11 411 '11 v r r •N _ I I C C Pill �■l l�"1'i I i ♦ 1 I1 II 1.I' n l - " C7 1 I > ii nl fll 6 a I,+ u q i1;=lII11j 9 September 2010 Alaska Department of Natural — 'sources Land Administration System Page 1 of,t Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28257 Printable Case File Summary See Township,Range, Section and Acreage? 0 Yes O No New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28257 Search for Status Plat Updates As of 09/27/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/11/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 012N Range: 012E Section: 25 Section Acres: 6'0 Search Plats Meridian: U Township: 012N Range: 012E Section: 26 Section Acres: 6'0 Meridian: U Township: 012N Range: 012E Section: 35 Section Acres: 6'0 Meridian: U Township: 012N Range: 012E Section: 36 Section Acres: 6'0 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-52 12N 12E UM 25,26,35,36 2560.00 04-01-1977*** UNITIZED LEGAL DESCRIPTION*** PRUDHOE BAY UNIT ESTABLISHED T 12 N., R. 12 E., U.M. http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=2825... 9/27/2010 Alaska Department of Natural "-sources Land Administration System Page 1 of1A Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28258 a Printable Case File Summary See Township,Range, Section and Acreage? — ® Yes 0 No ( New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28258 N14 Search for Status Plat Updates As of 09/27/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED I4 Meridian: U Township: 012N Range: 012E Section: 27 Section Acres: 640 Search Plats Meridian: U Township: 012N Range: 012E Section: 28 Section Acres: 640 Meridian: U Township: 012N Range: 012E Section: 33 Section Acres: 640 Meridian: U Township: 012N Range: 012E Section: 34 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-53 12N 12E UM 27,28,33,34 2560.00 04-01-1977***UNITIZED AND PARTICIPATING AREA LEGAL DESCRIPTION*** ENTIRE LEASE COMMITTED TO PR UDHOE BAY UNIT AND OIL RIM PA PR UDHOE BAY UNIT, TRACT 21, IN ENTIRETY OIL RIM PARTICIPATING AREA http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=2825... 9/27/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME �/ � S- 07C PTD# x/01,11 of Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: "--3e4/40.4/ ,,ay POOL: 44 ' ± / t 2 Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 ID III -6 ' 8' co 0 u) u) 0 3 ao f0 _ y c Q ; O > 0 - N `0 3 • r o. to w E O E a { o , 2 ui co' a m , i . . a — m; -o 0) N 2 r c. 2 ' w O . (n Q O. N-Lo: :'•-• '' .'' , , , , . , , , , . . , . . . , , Co CI, 0. o W. �. E 3 m ?�. W, CO, v. O• m n , a co ' a a). •H. a O co co c v .0 a O u m � o . c W ° o. 00 N N ; CO Q v i'a.Z c °) ch � . D. 113' o c+) a?. 0 CO CZ D 0) � � ' � � o c' 0' 0' a` 0' m �, - n °° rn a) E' 0) c .0 CO aj, N' 3 re _0) ( ' I d. co CO c rn e. c, V '0 0' `p_ v) a' p Cl) •- 0) a 'y. o, 3 > Co c ca. a N 0 `) ' m' 0 0 0• 0' 0. ' a >: •O C; N' ' Z N, N, 7, 0 U, V U 6 N, �, 0., O. II c , W N' CO' 0 (/) Co d' N iE M' a. 2, g. _. a , Q N N, a0)), m; 0) o, 2', 2', m; 0)); 2), 2', a; a, Q a, a; a. a; Q; 2, m; 0)); 0)); m a; 0)); m m' a0); ay); a2. Q 0 Q Q Q Q I E. z >; >, >- }. >- z, }, >- >- >- >, >-. z, z z z z, z z, z >- >- >- >- >- z }. >- >- >- }. >-, z z z z z z a LL E, 3 E 0. c a 7 , - Cr i . 0 d E O ?k, 0. c N. >. 0 o . 8 3; E 3. c o C _ II W N 0 0 a m ' a). E vi O -o j. •c. O. N. N c) 0,°-'-' N. 0 u 0 a)•L.L. J co I C rn v. o. as �. • c). y �. �. �, �. ao. +�. o c 0. N. a a), c > .E ,- c. o o o w. 0 8, a c y m c. > N. , 2, } 0) 3 = 0 3 0 0 CO, � v N c, p, - �. 3 p m, m U' t. 4 ::,7"5' O o �. o' 0 W 'c. a r) 9 O °. �. 3 ,, � c, rn L, a6 E �. 0 o U) < N a' a) a) of Z '.c0 w0' -011.1 ' o. 0. C 7 CO, a). a D: O, c p. c0 p. O. p) y 0 a- L c C a) C p N 0. w. ,b �a >, w. O >, v. 0, p2, u�. o. o, O Q E c = a c c E, m o r) c y F c o at) �'. C ' c. 0; o) 0, N, 0 a c = o O -O O' �' 3 p V' CO' p C p a)' r/j 0 > •c.0 Y c, rn n a 4 m. ._ o a. . 3 0 p ca a' a cU u; > m a) rn D a a O. 0 a) C c >, O > > .2 •0 C6, N, o' Y 1-0. 6. o" 5' O 0 0, E; C0 co' a. c` a' ), •o O. rn 0 a) C�o w?; E 4 c. c; 0. .0 a' o' p' 0 c' o CO, - �. ,; 4 w' 2 0 w, E 5 3 a) o y 4' m' 3 )= 0. a a O' .0, o, �' 0' m N .L..•' .L•' a. 0 M, O C ..0. y (p, L. O 2 rn' p a 3' c. p T >i' c o, z �. ° a) N, y, m. o a m 3; 3 -2 y; 0 . E. -; w' 'c�; a-); 3, N 2 o `m 0 a o a). N. a) m' 0 0' W O O O: 'o• c. -. � .j V. O. p 0• a 'a c• co, O. O L. 2, w.. U d O o. 0 cp. •v. v. > a). a v v. v 'Cr'. a) o. o) c w. O' O' @ o c o' �' �' c' o c) 0' •p' E 0 N' c .c o D: .� T C' H ate) a m' v' a`) `0 a' o a a' a c' v' 0 o n o' Q) Q) '_' v ' o' •o 2 E co o to c, o, e) O Qj 06 a L p, 0, c. C1 a) y, O, y' u), O: �, 0: 0 O) fl- l0 l6 <6 0 O N' O' N p) C, O, 3, N. z 0 co. c L. -� a' U, CO. E. O. O. • . C6. co m C. co c of O. O. . 0. co, 0 .O• p. N -� •p. V 2. c. V •0, O, CS a) O a 0 . a a o 0 >, y 0 0 0 3 c 0 • c a) a) 0 c c 1° CD Q a w w o c°)' a)' >. v a • aj 0' a - a) a°). a); Co 0 c C C a a) y 0. c (0 V V >o 'vim) - . 3. . 0, N c 0 0 m; aci; c c c' X' m; E 0 m m. C6 E m 3 0 `p c0 co Co /..) 0 0; 0 v, C) Co = c. 0 (0 0 O C V) w c o 0 0' 0 m o, ° .°. `� 0 0. o; >c o, a) o. o. m -o, m. r. r� 0- E •3. N. c I o' --E., v. ;CD J m E m C TD-, m a) cl,' a`) a). E E c 0, 3 0 c c 1- I- F- Co 7 m > c a, a; o o. n CL) E $ ), 0 c. m T m. 0, c. a, -0 0. 0, 0, 0 0, o o a 2 2; 2 co, v. 0 v "0 c. O. O. L, Cl) a) m m, a) o. p ✓ ca, -J, D, �. �. co, wOO, a, a0,, Qa, z Uv) 00,, 0,, c), a = aw 0 m, m, 0, 22 a o, co v), U, 1 O_ E . N M ' U CO r W 0) 0 N M tt U O N- `0.-0 O-) O N N M N (N C) N NN 0N N O M M N M M n M CM M r M O) 0 O O O_ •• 0 0 O a) O 0 2 c, C is co N N U Q ce -1- w 0 N ZA in M al N O y W o R c rn "50•E G. >• U' E ..+�.. N C c o) p k `p_ U) - p• Co O p• U) 0 W o E p v c 0 a 0 › a a a Q W Q 0 a Q