HomeMy WebLinkAbout176-062• Page 1 of 1
Regg, James B (DOA)
From: Regg, James B (DOA)
Sent: Tuesday, November 13, 2007 8:48 AM ~~ 1(~ t a'~o1
To: 'NSU, ADW Well Integrity Engineer' ~~
Subject: RE: PBU PWDW1-1
No action necessary
~~
Jim Regg
AOGCC ~ ~, ~$ '~O~Z
333 W.7th Avenue, Suite 100 {C~' ~~~ N~' `~
Anchorage, AK 99501
phone: 907-793-1236
fax: 907-276-7542
From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEn~gineer@BP.com]
Sent: Saturday, November 10, 2007 3:24 PM
To: Regg, James B (DOA)
Cc: NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech
Subject: RE: PBU PWDW1-1
Jim,
Historically the 4-year MITs were completed within the calendar year that the test was due. It wasn`t too Tong ago that we
changed the system to track the 4-year tests by due date to complete by that time. My only explanation for this wel9 is that
the MIT was planned to be completed before December of 2003, but the well was shut-in in Juiy. This type of tracking
issue and oversight will not happen now given the way we currently track 4-year M1Ts.
Please let me know if there is any action that you would like me to take.
Please call with any questions or concerns.
Thank you,
Andrea Hughes
From: Regg, James B (DOA) [mailto:jim.regg@alaska.gov]
Sent: Friday, November 09, 2007 5:10 PM
To: NSU, ADW Well Integrity Engineer
Subject: PBU PWDW1-1
Just completed a review of MITs due and found just one questionable well: PBU PWDW1-1 (PTD 176-062). Our info
shows the last MIT was 3/29/2003; test was due 3/29/2007. Injection records indicate the well continued injecting until SI
July 2007. Do you have a record of an MIT done between the previous (3/29/2003) and the due date? Thank you.
Jim Regg
AOGCC
333 W.7th Avenue, Suite 100
Anchorage, AK 99501
phone: 907-793-1236
fax: 907-276-7542
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Reg~"@~d~.state.ak. us
OPERATOR:
FIELD I UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska) Inc.
Prudhoe Bay I PBU I PWDW1
03/29/03
.Bryan McLellan
Not witnessed
P.T.D. 11760620 Type test
Notes: Test to investigate high lAP
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
P.T.D.
Notes:
Type Inj.
Type test
Type Inj.
Type test
Type Inj.
Type test
Typel~.
Type
Packer Depths (ff.)
MD/TVDI 3,235'I 3,235'
Test psiI 15001
Pretest Initial 15 Min.;. 30 Min.
.-.
TubingI 1740J 17801 ~01' ~01 IntervalI O
CasingI 16501 24001 24001'..'--'.24001 P/FI P
Test Details:
IA FL at surface. Pumped I bbl of diesel down the IA.
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
O = Other (describe in notes)
MIT Report Form
Revised: 06/19/02 MIT PBU PWDWl-1 03-29-031.xls
.
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Cammy O Taylorgg~ DATE: September 19. 2001
Chairman
SUBJECT: Mechanical Integrity Tests
THRU:
Tom Maunder ~/-~i3 .,~'~O,~,,_,_~ BPX
P.I. SupervisorJ~- "~ ~,~) (, PWDW 1-1
' -'~;.?k.,,,-- PWDW 3-1
FROM: Chuck Seheve PBU
Petroleum Inspector Prudhoe Bay
Ne.N- CONFIDENTIAL
. ' ' . .Pa. cker ~ . . .Prelest initial 15 Min. 30M!n. '
WealPWDW 1-11Typelnj. I S I T.V.D. I 32.~ ITubingi 1640 !164~! 1640 I ~,~ l l.~v='l~-.
p.T.D..I 176-062 IType. te"l P- IT~.~I SOO .l_C~ngl 7OO I 2~X).I 2470 I 246O ! P/F I~"~1
IIoles: 4-year '-::~ I
:WdlIPWDW3'IlTypelnj. I N_ I T.v:b:'] .... I Tubingl' ~.,O I'~ I ~'1 ~..
P.T,D.I 178-039ITypetesti P .ITestpsil I ca~ngi I 2O4O1 ~01 ~.aOI P/F t~':-_-..~_P-~:-~I
__
/
,.IT~' ~.~..I: ' I T.V.D. I ..I T.~.~ I. "I ' ' ' I I I'"~"~1
ITypetestl ITest~l i Ca~l. I i I ., I P": .! .
I T, m,~.J.I ' I T.v.D. !I Tubing I : I '"i ' ' I"' l~.t-~.. I
Type_~1 , IT,,'~ ~1 I ,c~,'~ I I I ,I I P/F I
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Intemal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
I= Initial Test
4= Four Year Cycle
V= Required byVariance
W= Test during Work0~r
O= Other (describe in notes)
Tast"s Details
I traveled to BPXs Flow Stations 1 & 3 and witnessed the 4 year MIT on wells PWDW 1-1 & PWDW 3-1. The pretest
tubing and casing pressures were observed and found to be stable. The casing was then pressured up and observed for
30 minutes with both wells demonstrating good mechanical integrity.
M.I.T.'s performed: 2
Attachments:
Number of Failures: _0
Total Time during tests: ,2 ho, ur
CC:
MIT report form
5112/00 L.G. MIT PBU PWDW 1-1 PWDW 3-1 9-19-01 CS.xls 1011101
,
ARCO Alaska, Inc.
Post Office Box 1 u0360
Anchorage, Alaska 99510-0360
January 11, 1999
Ms. Wendy Mahan
Alaska Oil & Gas Conservation Commission
3301 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: PWDW Well Work Activity
Dear Ms. Mahan'
Attached is a well work history for each of the ARCO operated Prod~u~r
Disposal Wells as you requested. If you require additional information or
clarification, please contact Bill Mathews at (907) 263-4607.
Sincerely,
Injection Engineer
Attachments
RECEIVED
JAN 12- 1999
Alaska 011 & Gas Cons. Comm~sslo,,
Anchorage
ARCO Alaska. Inc. Is a Subsidiary of AtlanticRIchfieldCom;)anv
PWDWI-1
Surveillance opportunities are limited. Access to the perforations is restricted due to
SSSV fish at 3211 'SLM. Current plans are to tag and mill out the SSSV fish.
Date
06/19/77
10/O8/86
01/11/88
02/08/88
02/15/88
07/23/88
11/05/88
11/09/88
03/03/89
02/02/90
07/20/90
08/26/90
04/24/91
06/10/93
06/09/93
06/13/93
01/26/97
O8/O4/97
08/10/97
08/11/97
Well Event
Shot 107' of initial perforations (5926'-5936', 5940'-5960', 5969'-6004',
6157'-6167', 6296'-6316', 6376'-6388')
Well passed a state witnessed annular communication test on the tubing
x 9-5/8" annulus.
Static bottom hole pressure survey (SBHPS) - 2721 psig @5990'
Ran a spinner survey. A channel was identified 168' up from the
perforations
Well passed 13-3/8" annular communication test
4-1/2" tubing was changed out with 7". Well was reperforated 100' (5926'-
5936', 5943'-5960', 5969'-6004', 6157'-6167', 6296'-6136', 6376'-6388')
SBHPS and temperature survey (TEMP) - 2846 psi @5900'SS, TEMP
indicated injection from 5700'-6050'MD which was interpreted as either a
channel or fracture.
SBHPS - 2795 psi @5925'SS.
SBHPS & TEMP - 2772 psi @ 5825'SS. Indicated a channel to
5600'MD.
Added 30' of perforations (5250'-5280').
9-5/8" passed mechanical integrity test (MIT) at 2000 psi, 13-3/8" failed
MIT.
Passed state-witnessed MIT
Ran a spinner survey. Showed lower 4 sets of perforations covered in
schmoo.
Passed 9-5/8" MIT.
Tagged obstruction in tubing @3227'. Washed it down to SSSV. Pulled
SSSV, but lower part fell downhole.
Fished flapper housing and SSSV coil spring.
Attempted to fish spear that was being used to fish SSSV.
Milled spear and SSSV. Remainder fell downhole.
Well passed inner annulus MIT (MITIA) at 1500 psi.
Tagged lower part of SSSV @ 321 I'SLM.
RECEIVED
,JAN 12 1999
Alaska Oil & 6as Cons. 6omml~Jon
Anchorage
ALJ%SKA INDIVIDUAL WELL PRODUCTION AS OF
WELL-NAME: PRUDHOE BAY UNIT
FIELD/POOL: PRUDHOE BAY, PRUDHOE UNDEFINED
SALES CD - 60 ACCT GRP - 040 ** DISPOSAL PROJECT **
1977 JAN
METH
DAYS
OIL
WTR
GAS
1977 TOTALS
FEB MAR APR MAY JUN JUL
OIL WATER 21,384 GAS CUM OIL
1978 JAN
METH OTHER
DAYS 10
OIL
WTR 7,827
GAS
1978 TOTALS OIL
1979 JAN
METH OTHER
DAYS 31
OIL
WTR 13,960
GAS
1979 TOTALS OIL
FEB M3LR APR MAY JUN JUL
OTHER OTHER OTHER OTHER OTHER OTHER
6 20 19 19 19 14
4,290 8,810 10,569 10,931 12,011 8,296
WATER 136,398 GAS CUM OIL
FEB MAR APR MAY JUN JUL
OTHER OTHER OTHER OTHER OTHER OTHER
24 21 18 31 27 29
13,103 11,085 43,917 324,357 175,840 130,686
WATER 1,295,648 GAS CUM OIL
FEB MAR APR MAY JUN JUL
OTHER OTHER OTHER OTHER OTHER OTHER
26 30 25 29 28 22
34,149 37,606 34,098 57,410 56,816 91,050
WATER 620,066 GAS CUM OIL
FEB MAR APR MAY JUN JUL
OTHER OTHER OTHER OTHER OTHER OTHER
24 29 30 29 29 16
22,909 509,884 56,241 20,317 29,782 26,490
WATER 783,727 GAS CUM OIL
FEB MAR APR MAY JUN JUL
OTHER OTHER OTHER OTHER OTHER OTHER
13 12 14 17 15 10
25,681 23,044 14,654 16,481 31,923 13,530
WATER 281,879 GAS CUM OIL
1980 JAN
METH OTHER
DAYS 31
OIL
WTR 53,320
GAS
1980 TOTALS OIL
1981 JAN
METH OTHER
DAYS 28
OIL
WTR 25,462
GAS
1981 TOTALS OIL
1982 JAN
METH OTHER
DAYS 12
OIL
WTR 47,238
GAS
1982 TOTALS OIL
FINAL STATUS: SER 1WINJ CURRENT STATUS: SER WDSPL
/ '~
AUG SEP OCT NOV DEC
OTHER OTHER OTHER OTHER OTHER /~e~40 f~ ~.,
i 6 6 11 14
1 5,996 2,629 7,594 5,164
CUM WATER 21,384 CUM GAS
AUG SEP OCT NOV DEC
OTHER OTHER OTHER OTHER OTHER
24 26 26 25 26
14,932 14,454 15,006 15,028 14,244
CUM WATER 157,782 CUM GAS
AUG SEP OCT NOV DEC
OTHER OTHER OTHER OTHER OTHER
20 21 12 30 26
164,904 133,654 17,550 181,162 85,430
CUM WATER 1,453,430 CUM GAS
AUG SEP OCT NOV DEC
OTHER OTHER OTHER OTHER OTHER
26 29 28 30 30
66,344 66,337 43,671 40,611 38,654
CUM WATER 2,073,496 CUM GAS
AUG SEP OCT NOV DEC
OTHER OTHER SHUT-IN SHUT-IN OTHER
28 I 10
81,022 1,605 10,015
CUM WATER 2,857,223 CUM GAS
AUG SEP OCT NOV DEC
OTHER OTHER OTHER OTHER OTHER
8 8 12 6 14
14,287 28,043 20,870 22,020 24,108
CUM WATER 3,139,102 CUM GAS
STATE OF ALASKA %-:--..
... ' ALASKA '"""" AND GAS CONSERVATION CO --'-'IISSION
REPORT SUNDRY WELL OP nATIONS
1. Operations performed: Operation shutdown Stimulate ~ Plugging ..-. Pedorate X_~olher ~ ~ ~ ~ ~ ~5,~, ~ ~, ~,
Pull tubing
i
Alter casing
Repair well
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stra~graphic
4. Location of well at surface
937'N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
At top of productive interval
937'N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
At effective depth
At total depth
937' N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
6. Datum of elevation(DF or KB)
55' RKB feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
PWDW 1-1
9. Permit number/approval number
76-62/90-014
10. APl number
50 - 029-20226
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
6640 feet
6640 feet
Plugs(measured) Fill @ 3209' MD (11/8/92)
Effective depth: measured 3209 feet
true vertical 3209 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 75' 20" 150 sx Arctic Set 75' 75'
Sudace 2596' 13-3/8" 4200 sx Arctic Set 2596' 2596'
Production 6593' 9-5/8" 500 sx Cl G 6593' 6593'
Perforation depth: measured 5250-5280'; 5926-5936'; 5940-5960'; 5969-6004'; 6157-6167'; 6296-6316'; 6376-6388'
true vertical 5250-5280'; 5926-5936'; 5940-5960'; 5969-6004'; 6157-6167'; 6296-6316';
6376-6388'
Tubing (size, grade, and measured depth) 7", 26~, L-80 PCT @ 3233' MD; 4-1/2", 12.75#, C-75, NPCT @ 3350' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See attached.
Treatment description including volumes used and final pressure
Packers and SSSV (type and measured depth) Baker FB-1 Packer @ 3235' MD; 7" Otis RPB SSSV @ 2190' MD
RECEIVED
JAN 1 1 t995
Alaska Oil & Gas (.;oas. Comm[ss[o[t
14.
Prior to well operation
Subsequent to operation
Reoresentative Daily Avera_oe Production or Iniection Data ~flcJl0rag~
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
.... 60,700 ~ --
82,900
Tubing Pressure
1800
1750
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil m Gas~ Suspended ~ Service
Disposal Injector
17. I hereb,~ certify that the fo~and correct to the best of my knowledge.
Sicjned Title Engineering Supervisor
Date //~%
Form 10-404 Rev 06/15/88
935/13 cc: SW. JWP
SUBMIT IN DUPLICATE
PWDW 1-1
DESCRIPTION OF WORK COMPLETED
ADDED PERFORATIONS
A brief description of work performed on this well follows:
2~2~90:
MIRU & RIH w/perforating guns to shoot add perforations.
Shot Add Perforations at:
5250 - 5280' MD (TK-2) Ref. Log: BHCS 9/21/76.
All perforations were shot @ 4 spf, 90 deg phasing.
POOH & verified all shots were fired. Rigged down.
Returned well to disposal injection service.
1. Type of Request:
STATE OF ALASKA
ALASKA '~,ND GAS CONSERVATION C¢ SSION
APPLICA, FOR SUNDRY AP,-,riOVALS
Alter casing Repair well
Change approved program
Operalion shutdown -..- Re-enter susper~ well
Plugging __ Time extension ,~m~late ~
Pull tubing Variance Perlorate ,~" ~ Other X
5. Type of Well 6. Datum of elevatio"i~(~.~r KB)
Deve~pment m 55' RKB ?/,¢*
Exploratory ,~
Stratigraphic 7. Unit or Property ". ~/
set, ce x Prudhoe Bay Unit
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
ECEIVED
DEC 1 (; ~992
4. Location of well at surface
937'N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
At top of productive interval
937' N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
At effective depth
Alaska 0il & Gas Cons. C0mmissi0~
At total depth Anchorage
937' N & 1531' E of SW Cr., Sec. 31, T11N, R15E, UM
feet
8. Well number
PWDW 1-1
9. Permit number
76-62
10. APl number
50 - 029-20226
11. Field/Pool
Cretaceous-Undefined
12. Present well condition summary
Total depth: measured
true vertical
6640 feet
6640 feet
Plugs(measured) Fill @ 3209' MD (11/8/92)
Effective depth: measured 3209 feet
true vertical 3209 feet Junk(measured)
Casing Length Size Cemented
Conductor 75' 20" 150 sx Arctic Set
Surface 2596' 13-3/8" 4200 sx Arctic Set
Production 6593' 9-5/8" 500 sx CIG
Measured depth TrueveAicalde~h
75' 75'
2596' 2596'
6593' 6593'
Perforation depth: measured 5926-5936'; 5940-5960'; 5969-6004'; 6157-6167'; 6296-6316'; 6376-6388'
true vertical 5926-5936'; 5940-5960'; 5969-6004'; 6157-6167'; 6296-6316'; 6376-6388'
Tubing (size, grade, and measured depth) 7", 26~, L-80 PCT @ 3233' MD; 4-1/2", 12.754t, C-75, NPCT @ 3350' MD
Packers and SSSV (type and measured depth) Baker FB-1 Packer @ 3235' MD; 7" Otis RPB SSSV @ 2190' MD
13. Attachments
Description summary of proposal X
14. Estimated date for commencing operation
December, 1992
16. If proposal was verbally approved
Name of approver
Date approved
Detailed operations program __ BOP sketch X
15. Status of well classification as:
Oil __ Gas ~ Suspended _._
Service Disposal Injection Well
17. I hereby certify that the foreggi,ng is true and correct to the best of my knowledge.
Signed \~/9~~- '~' "~"~""-' ~'~"'"'~'~ ' Title Sr. Area Operations Engineer
FOR COMMISSION LI~I= ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test
Approved by order of the Commissioner
Subsequent form required 10- ~<~
Origins!
David W ~.~:hnston
~ ~mmisSioner Date
Form 10-403 Rev 06/15/88
930/13 KRF cc.' 5;W. JWP
SUBMIT IN TRIPLICATE
PWDW 1-1
PROPOSED WORK PROCEDURE
CTU FILL CLEANOUT & MUD ACID STIMULATION
A brief description of the proposed work on this well follows'
(1) RU CTU & perform a Fill Cleanout down to PBTD at 6505' MD, then wash
up one pass across the perforations with 75%/25% Diesel/Xylene,
followed by one upward pass washing with 15% HCl. POOH w/CT,
while displacing with one well volume of 1% NH4CI Water. RD CTU.
(2) RU equipment & PT to 3000 psi. Perform a Mud Acid Stimulation.
Pump fullbore as follows:
* 25 bbls 1% NH4CI Water @ 25 bpm, followed by
* 250 bbls 12% HCI- 3% HF w/0.6 ppg bezoic acid flakes
for diversion @ 25 bpm, followed by
* 560 bbls 1% NH4CI Water @ 25 bpm.
(3) Rig down & release pumps & equipment.
Return well to disposal injection service & report stimulation results.
EEEIVED
DEC 1 6 1992
~,laska 0il & Gas Cons. [;0mrnissior~
Anchorage
6
5
4
3
2
A~ask
CO!L ED TUB INt3 UN ! T
BOP EOU ! PllENi'
1. 5000 PSI ?" W£LLHEAD CONNECTOR t"LAhG[
2. 5000 PSI 4 1/15" PIPE RAMS-
3. 5000 PSI 4 1/6" HYI~RAULIC SLIPS
4. 5000 PSI 4 1/6" SHEAR RAMS
5. 5000 PSI 4 1/6" BLIND RAMS
6. 5000 PSI 4 1/16" STUFIrlNG BOX
3,
RE( EIVED
DEC 1 6 1992.
Oil & Gas Cons. (;ommissio~'
Anchorage
NIRELINE BOP EOUIPMENT
_ i i · iii
1. 5000 PSI ?" WELLHEAD CONNEC10R IrLANG[
2. 5000 PSI WlRELIN[ RAIDS (VARIABLE SIZE)
3. 5000 PSI 4 1/6" LUBRICAIOR
4. 5000 PSI 4 1/6" IrLOW TUBE P^CK-Olrlr
ANCHORAGE,
REFERENCE: ~ARCO CA~ED HOLE FINAL~ ..... -~'. ;~ '
~-~ .::.r?.::%.~,...J?-...c~i TEMFERATURE .:... '-~...+. ' ../... . -..:'..-..,:.... RU .,':~.. ...-~ ..... HR$ -
· * ..... 6- t- -~:-~'~.~=~:~: .-=?-t-= ......... T U B I N G-,-C U3:TER..,- ...... -~..-~. :-~.--~. ..... ?:.:~.-.:~??R U N .; t ~?~ .,.?~?~-=..-=. A,T LA £ --
~. ~.~, ~4 ',=~ - .-:, --~.-'. ' ',- - - '~--~-- ~'.' .... :~:r~-'-~s"~:~,~~ %.~'~'.~ -~-~ .'~.'~.~..~'~- -: '-,r'~,-= · t .~,--~'~
· * - f 2-8B ?~'~1'~9 i ~- "CALl PER:LOG.-. ~':'.;~" - .'= ¥,~- _'.:~._::~!~S~:-~ ~':' .'=...:"~ .~?:.,. ~:!.~ RUN
......... ,.
"OWDW-£E-..-':ili-'~i~9,t !.':_ ..---. P i TS '~:~~ii~;'~.i.--~'--.,-='' ...-":.::.::~-..: ' ?'i~..!.~.~-~i,,"~RUN ,,t ~,:.'i.~ .".-"~'~.~:~.i CAMCO
- PWDWt ~t'~:~~-~.t. · -, ',ENJECTION.~;PROFILE.?'-~?~?:.~<~,,'~'''', .... .~.~.'~?,.-~: =--.RUN ~.~.~,.~~7~.CAMCO
n ~..PWDWt.'2A ~'4,Z4--~-i -- ...... INJECTION~.ROFIL~ ~'.L%':::./ ........... :..:..:_: RUN-t.A:.~- . .~-~ ..... -~..CAMCO
~ .
................ :. '....'- ..... :? ::ii:' F:' E F;.'. F' F;..' !E C f'~ i:~'. f':'
2 .... 2 '7 2 .... S ..... :? (') E:.'i'?,'T
2 .... 2 '7 2 .... ..:!i ..... !;:' (') . C:iE'f'
4 .... ,:!'., 2 ..... i ,?) .... ':?':") C f'.~ i... I... ~':'."m i:'.i/' t::' E l:;.: F:'
....":"' ..... ...~" ":::... ...... .....::: ..... :;'.. ::'".... F:' tE I:i: F:' F.: E C 0 l:;~ })
':;; ...... :? i ....... ..-,.~ ..... ::;'~ ":':.... I::' iE I:~ ,l::' !:;~ Ii:. C f'} Fi: ;iii:,
'? ..... i...:.'::' 'i ..... i i ..... :? () I::' E i:;~ i::' F;.I IE ,...r'i'i... F.:.i,.:r"
· i .~i'.'~ .... 6 2 .... 2 .... ':.'.:',3 'i" U E: ]Ii',! i;. t:" U i',! Ii;;I..I E i::.: ik iii; C il)I:~.' I[)
i 4 .... "2,?, 2 .... '7 ..-. :.?,3 F:' E I:~'. I'-" l:~.i Iii; Ii'.;: 0 l:~.i.tli:,
F:' b.i )5 !,,.i 'i ..... i 2 .... 2 ..... :/' (') i::' E I:(F:' t:,.:lii; i'.') i'j t:~..' ~)
ISEB 2 7 1990
Gas Cons,
.... E Iii; i",! 'i" F;.: ,,':?: I... F:' T t_. E ,?.;:
.,,."",...."'" I"t Iii; ",," I:;..' r').. i'J.
):) &
41.' Iii: X 'f' iii: i".! ;!;: :[ 0 i".! IE X t::' I... 0 f:;~ ¢'., '¥' ;i; (3 i".!
-,,-'"' l:i; X X ~'"~... i"-l.
i"i ¢'~ t:;l ¢:'~ 'i" I'-i 0 i"'t
· "' l:.',
.,,. H CI "' :[ I_
.ii.
· ,,. F:' I"1 :!: I... 1._ :[ F:' *''
J::'Jli", hii:;'l.,...,.., i... F:']:l...li:;,?
':" i::', F:'X
'11' ,,,
5: i" Pl'f' iii: C,' F' r:':~ 1... r:'~ ;}:,' I'(/.'i
'"' 'f' l!i. '.," r::i C.'
'11' ., ,, , ,,
ARCO Alaska, Inc.
Prudhoe Bay Eh~,neering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
January 5, 1990
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: PWDWI-1 Permit No. 76-62
Dear Mr. Chatterton:
Attached, in triplicate, is the Application for Sundry Approval detailing work
to be performed on the above-referenced well.
V~v?' truly yours,
D. F. Scheve
DFS/DTK/klp
Attachment
cc: J.S. Dietz, BP Exploration
J. Gruber, ATO 1478
PI(PWDW1-1)W1-3
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C
STATE OF ALASKA
ALASKA C ~,ND GAS CONSERVATION COI~ SSION ,
APPLICA'I,ON FOR SUNDRY APF'HOVALq !G
1. Type of Request:
Abandon Suspend
Alter casing Repair well
Change approved program
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
937'N & 1531'E of SW Cr., Sec. 31, T11N, R15E. UM
At top of productive interval
937'N & 1531'E of SW Cr., Sec. 31, T11N, R15E, UM
At effective depth
At total depth
937'N & 1531'E of SW Cr., Sec. 31, T11N, R15E, UM
Operation shutdown Re-enter suspended well ,
Plugging Time extension Stimulate
Pull tubing Variance Perforate X (~ther
5. Type of Well 6. Datum of elevation(DF or KB)
Development 55' RKB feet
Exploratory
Stratigraphic
Service X
7. Unit or Property
Prudhoe Bay Unit
8. Well number
PWDWI-1
9. Permit number
76-62
10. APl number
50 - 029-20226
11. Field/Pool
Cretaceous-Undefined
12. Present well condition summary
Total depth: measured
true vertical
6640 feet Plugs(measured)
6640 feet
Effective depth: measured 5600 feet
true vertical 5600 feet Junk(measured)
Casing Length Size Cemented
Conductor 75' 20" 150 sx Arctic Set
Sudace 2596' 13-3/8" 4200 sx Arctic Set
Production 6593' 9-5/8" 500 sx CIG
Measured 'dePth,' True vedical depth
0-75' 0-75'
0-2596' 0-2596'
0-6593' 0-6593'
Perforation depth: measured 5926-5936', 5940-5960',5969-6004', 6157-6167', 6296-6316', 6376-6388'
true vertical Same as above
Tubing (size, grade, and measured depth) 7", 26~ L-80, 0-3233'MD
Packers and SSSV (type and measured depth) SSSV - Otis RPB Nipple, 2190'MD; Baker FB Packer, 3235'MD
13. Attachments
Description summary of proposal X Detailed operations program BOP sketch X
14. Estimated date for commencing operation 15. Status of well classification as:
January 1990
16. If proposal was verbally approved Oil Gas Suspended
Name of approver Date approved Service Produced Water Disposal
17. I hereb~ certify thp, t the foregoing is true and correct to the best of my knowledge.
S i g n e d ~/~~'~.,~~ Title Operations Engineering Manager Date
FOR COMMISSION LI~E E)NLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10-
Approved by order of the Commissioner
ORIGINAL SIGNED BY
LONNIE C. SMITH
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
APPLICATION
FOR SUNDRY APPROVAL
PROPOSED ADDITIONAL PERFORATIONS FOR
PWDW 1-1
Proposed Interval Proposed Interval Footage Footage
('MD) ('SS) ('MD) ('SS) SPF Zone
5250-5280 5195-5225 30 30 4 TK2
5582-5612 5527-5557 30 30 4 TK3
5734-5750 5679-5695 1 6 1 6 4 TK3
5766-5784 5711-5729 1 8 1 8 4 TK3
5816-5836 5761-5781 20 20 4 TK3
Comment
Adperfs
Adperfs
Adperfs
Adpeds
Adperfs
Existing Interval Existing Interval Footage Footage
('MD) ('SS) ('MD) ('SS) SPF Zone
5926-5936 5871-5881 1 0 1 0 4 TK3
5940-5960 5885-5905 20 20 4 TK3
5969-6004 5914-5949 35 35 4 TK3
6157-6167 6102-6112 1 0 1 0 4 TK3
6296-6316 6241-6261 20 20 4 TK3
6376-6388 6321-6333 1 2 1 2 4 TK3
Depths Referenced to BHCS (9-21-76)
Comment
No injection
Fill Covered
Fill Covered
Fill Covered
Comments
PWDW 1-1 is the FS-1 produced water disposal well. These pedorations will improve injectivity and
facilitate additional injection volumes at acceptable wellhead injection pressures.
5000
N i iREL i NE ~OP EgU ] PHEN7
ARCO ALASKA, INC.
F'.O. BOX i00368
ANCHORAGE, ALASKA
DATE' 3-2?-89
REFERENCE' ARCO CASED HOLE FINALS
2-7 3-2-89
3- t ~ :3-3-89
5-t0 :3-t7-89
5-~ 7 3-4-89
9- i I 3-5-89
I ~-~ i 3-~ 7-89
~ ~-~ 3 3-6-89
~ ~ -~ 6 3-~ 4-89
~2-29 3-~ 6-89
F'WDWt-t 3-J-89
PWDW3-~ 3-4-89
PITS
INJECTION PROFILE
PITS
F'RODUCTION PROFILE
TEMF' SURVEY
TEMF' SURVEY
PRODUCTION PROFILE
TEMP
PITS
TEMP SURVEY
STATIC TEMF' SURVEY
RUN ~, 5"
RUN i, 5"
RUN J, 5"
RUN
RUN ~, 2'&5"
RUN ~, 2'&5"
RUN ~, 5'
RUN ~, 2"&5"
RUNS t-6,
RUN ~, 2"
RUN i, 2"
PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIPT OF DATA.
CAMCO
CAMCO
OTIS
CAMCO
CAMCO
OTIS
CAMCO
OTI2
OTIS
CAMCO
CAMCO
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-1529
TRAN$
AF'F'ROVED ___
DISTRIBUTION
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORATION
EXXON
.
MARATHON
MOBIL
~' PHILLIPS
F'B WELL FILES
R & D
"' SAF'C
STATE OF ALASKA
TEXACO
** THE CORRECTED AF'I$ FOR THIS LOG IS 50z029-29263,
ARCO ALASKA, INC.
F'.O. BOX ~00360
ANCHORAGE, ALASKA 99~0
DATE: 3-29-89
REFERENCE: ARCO PRESSURE DATA
4-2 2-i0-89 BHF'--FLOWING GRADIENT CAMCO
4-t9 i-31-89 BHP--STATIC GRADIENT CAMCO
5-i7 2-t6-89 BHF'--SI'ATIC GRADIENT CAMCO
6-8 2-5-89 BHP--$'FATIC GRADIENT CAMCO
9-3 t-i5-89 BHP--STATIC GRADIENT O'FI~'
9-ti t-3t-89 BHF'--$TATIC GRADIENT CAMCO
9-ti 3-5-8? BHF'--FLOWING GRADIENT CAMCO
tt-t t2-2i-88 BHP--STATIC GRADIENT OTIS
ti-ti 3-t7-89 BHP--$TATIC GRADIENT OTIS
ti-t6 3-t4-89 BHP--STATIC GRADIENT OTIS
t2-i5: 2-tt-89 BHP--STATIC GRADIENT CAMCO
t2-23 2-i5-89 BHP--STATIC GRADIENT CAMCO
l 4-28 2-5-89 BHF'--STAI'IC GRADIENT CAMCO
t6-6 3-it-89 BHP--PRESSURE BUILD-UP OTIS
t8-t7 2-t3-89 BHF'--FLOWING GRADIENT. CAMCO
PWDWt-t 3-3-89 BHP--STATIC GRADIENT CAMCO
PLEASE SIGN AND RETURN THE ATTACHED COF'Y A~' RECEIPT OF DATA.
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
ATO- ~ 529
TRAN,,S ~89i~
AF'F'ROVED __~___
Anchorage
DISTRIBUTION
CENTRAL FILES
CHEVRON
D & M
EXTEN~'ION EXPLORATION
EXXON
MARATHON
MOBIL
F'HILLIF'S
F'B WELL FILES
R & D
SAF'C
STATE OF ALASKA
TEXACO
ARCO ALASKA, INC.
F'.O. BOX
ANCHORAGE, ALASKA
995~8
REFERENCE' ARCO CAGED HOLE FINALS
3-9 1t-t3-88 COLLAR/F'ERF RUN
3-~9 ~t-~3-88 COLLAR/PERF RUN
3-25 tt-~9-88 COLLAR/F'ERF RUN
3-26 t2-~?-88 COLLAR RUN
3-26 J2-16-88 VERTILOG RUN
5-tJ ~-28-88 COLLAR/PERF RUN
?-~t t2-~T-88 COLLAR/F'ERF RUN
?-49 t2-~?-88 CNL-GAMMA RUN
?-34 tt-~J-88 COLLAR/PERF' RUN
~2-~ t2-t8-88 COLLAR RUN
t2-~5 ~2-J4-88 MECH. PLUG gETTING RECORD RUN
t4-37 t2-~?-88 COLLAR/PERF RUN t, 5'
PWDWt-~ ~t-9-88 CCL RUN
F'LEA~E SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA.
GEAR
GEAR
GEAR
Al'LAg
ATLAS
GEAR
ATLAS
ATLA~
GEAR
ATLAS
$CH
ATi_A~
GEAR
RECEIVED BY .... ' ....
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-~529
TRAN$ ~88724 ~
APPROVED
DISTRIBUTION
CENTRAL FILES
CHEVRON
D&M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
PHILLIF'$
F'B WELL F'ILE~
R & D
SAF'C
gTATE OF ALASKA
TEXACO
ARCO ALASKA, INC.
P.O. BOX JO~)S6"'J -'
ANCHORAGE, ALASKA 995,~,
DATE' iJ-28-88
REFERENCE' ARCO CASED HOLE FINALS
i -23 t 0-3t '88 COLLAR
5-8 .t i -t 7-88 COLLAR
5-8 t t -i 7-88 COLLAR/F'ERF
PWDWt-i ti-~ 6-88 TEMF'
· ..,' $
RUN i, 5"
F:,'[JN i, 5'
RUN i, 5"
RUN'i, 5'
PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECFIF'T OF DATA.
TRAN$ ~8867t ~
AF'I::'R.O VE D
DISTRIBU'FION
CENTF;.:AL FILES
C Iq E V 1-;.' O N
D & H
EXTENSION EXPLORATION
EXXON
MARA'i'HON
.11,
· ,,. HOBIL
· ,,-F' t"11 L L I F' S
PB WELL_ 'F'II_E,S'
F;.: & D
· ,,-,"~AF'C
'"'..- STATE C)F' ALASKA
:~ TEXACO
C A M C O
A ]'1_ A S
ATLAS
C A M C 0
A: '3 ALASKA, INC ....
F',O~ BOX 100~60
ANCHORAGE, ALASKA 99510
REFERENCE° ARCO PRESSURE DATA
-2S t 0-.~t -88
2-I 6 i (.'), -2~-88
~ -i 6 ~ 0-28-88
· S- i t ~ -- i 7-88
8'-i ~ 0-'>°'-°8-, ~,
8-2 t 0-2S-88
PWDW!-i ti'-~-88.,-
BHP--$TATIC C-F;:A D I r.:.N T
BHF'--~.'TATI C GRADIENT
B H F ..... $ 'i' A 'i" I C (; I;:. A D i E N T
BHr' .... FLOWING GRAD'lENT
BHf' .... ;"'::TAT ! C GRAD I ~.-.r.T
BHF ..... STAT I C'.'GRAD T. E.N T
B iq F .... S T A T i C(; F.: A D ! lb_" N '¥
PI..EiAZE SIGN AND RETURN THE ATTACHED C;OPY r:'-"~S FqECEII::'T OF' DATA,,
RECFiVED BY ............. -z--'
HA. VE A NICE DAY!
s A L C Y !.4 0 r--- F' r--- c K E F: '~~ Oil, & ~as Co~S. ~om~sStO~--'
A '1" O- i 5 2 9 ~ ~a.$~ ,..,,;-. ~chorage'
'¥ I:.: A N :~.' ~886F~7
APPROVED
DISTRIBUTION
CENTRAl_ F I t.. fi:' ,5;'
CHEVI-?ON
~ D & M
EX'f'EN~]:ON -"'" ,"'""'"' ...
E.~.F t_ u r'..,-,T I f'l N..
~ EXXON
MARATHON
~'"' MOBIl_
· f,:F' i"11 L I.. ! F' ,.";'
F'B WELL FILE,S'
· .- R & D
· "' SAF'C
-~ ,?;'TAT'E OF ALA3'KA
· ,.'"' '¥EXACO.
DATE' f i--'"':.3.-.S8~
REF:E:RENCE' ARCO F'RE,:S",.?UF;..'iE DA f'A
· '--1..- .:'5 ¢I (3 - 21 .- 8 8 B H F' - - ;'-.? 'f' A 'F ! C (;- R A )'-:, I [-:' N 'i' C A i'i C C)
F'WDWi i ii-9 c8 3'TATIr' 5'UF;:Vi-'."Y
F:'L. EA;S..E ZIG. N AND RETURN THE ATTACHEf) COPY A;S. ,:-, r.- .,--, :: .,- ,
...... ~ :., L..: F:' 'i" ('i I:: D A 'l' A.,
F;:I!-] C: E ]: V' E D B Y .........................................................
f'iAVE A NICE DAY!
,?AI...L. ¥ HOFF'FCK EF;:
A "i' 0 .... 'i, .¢ ,.::.=' '* ,::,,.
:'..! 1-r' '.:", U, ::. J.J
CENTRAL. FILE:'--:
CHEVF;.:ON
:~: T') :~ id
E X 'f' !E ix! 3: I 0 N E X F:',..~ C)F:':. A 'f' t 0 ,i'--..~.
i'd A F.'. A T H 0 N
-II: M 0 B .'I: L.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [ GAS [] SUSPENDED [] ABANDONED [] SERVICE I~ :B~:oduced ~4ate~: ])±sposal W.e..1
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 76-62
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-20226
4. Location of well at surface 9. Unit or Lease Name
937' FSL, 15:31' FWL, Sec.31, T11N, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
937' FSL, 1531' FWL, Sec.~l, TllN, R15E, UM PWDW 1-1
At Total Depth 11. Field and Pool
937' FSL, 1531' FWL~ Sec.31~ T11N, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool
RKB 22'I ADL 28326
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116'No'ofC°mpIeti°ns
09/10/76 09/21/76 09/28/76*I N/A feet MSLI 1
17. Total Depth (MD+TVD) 18. PIu~ Back Depth(MEHITVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
6640'MD/6640'TVD 6505'MD/6505'TVD YES ~ NO []I 21c)0 feet MD 1900' (Appr~x)
22. Type Electric or Other Logs Run
D IL, BHCS/GR, FDC/GR~ 4 arm Ca1, CNL/GR/CCL. CBL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 9b,_O# H-b,O ~,,r~: 7~,' 26" 150 sx AS cmt
1~-3,/8" 72_0# MN-R~ ~llr. f ?c~q~! 17-!/2" 4200 sx .~.5 cmt
9-_5/~" 47.0~ NN-~/Snn95 ~,,r~¢ 6593' !2-!/~" 500 sx C~._~ss C & 725 sx AS cmt
24. Perforations open to Production (MD+TVD of ToP and Bottom and 25. TUBING RECORD
interval, size and number) Perforated w/4 spf SIZE DEPTH SET (MD) PACKER SET (MD)
7"/4½" 3:350 ' 3235 '
5926 ' -5936 ' MD/TVD
5943 ' -5960 'MD/TVD 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
5969'-6004'MD/TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
6157 ' -6167 'MD/TVD N/A
6296 ' -6:316 ' MD/TVD
6376 ' -6388 ' MD/TVD
,
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
N/AI ....
Date of Test Hours Tested iPRODUCTION FOR oIL-BBL GAS-MCF WATER-BBL cHoKE SIZE IGAs'oILRATIO
TEST PERIOD
I
.
,
Flow Tubing Casing Pressure CALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE .,
,
28. COP E DATA ....
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
* NOTE: Workover performed 7/23/88.
Form 10-407 (Dani) WC5/030
Submit in duplica(~~//
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
GEOLOGIC MARKERS FORMATION TESTS
. .
,,,
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
N/^ N/^
I '
31. LIST OF ATTACHMENTS
None
,
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
ARCO ALAS'KA, INC.
F'.O. BOX iGOS60
ANCFil]RAGF, ALAS'KA
DATE · 8-26-88
REF'ERFNCE' ARCO CA2ED HOLE FINAL
t -t S 7-t t -88 COLLAR/PERF'
2-iA 8-i7-88 F'ERF RECORD
,.:. ..~ 7-'-")-88,...,_ COLLAR/F'EF;~F
:5-2~ 8-t 8-88 COLLAI;:/F'EI~:F'
~-2 8-~ 6-88 COLLAR/TEHF'
5-6 8-2;-88 PRODUCTION F'I~OF' 'r_ LE
7-~~ 5 7--9-88 COLI_..AR/F'ERF
7'-28 8-2~-88 PFC -
7-29 8-20-88 PI':'C
9 -i '7 -7 '-88 C 0 L L. A R / P E i:;.: F'
t4-'S 8-i :5-88 L. EAK DFTECTION
I 5-~ 4 7--':25--88 COLLAi,~/F'ERF'
t 6-i'4 8/i 2-i 4/88 PRODUC]' iON PROF GA3; Lit':T
t 7-5 8-t 0'-88 C-A;~' LIf"l' TEi"iF'
t 7-8 8-t 0-88 IN..J PRO 'rEi',lP F'LOWMF'f'ER
t '7- t 4 8 '- t i "- 88 1::' R 0 O U C 1" ~ 0 l'",~ I::' 1:;~ tJ t::' .[ 1_ F'
~ 8-t'6 8-5:-'88 F' l T.2'
F'WDW'i"-i '7'-t 8-88 COLLAR/F'EF.:F'
PLEAS'E£,~*"I
GN AND RE'T'URN 'f'H'E ATTACHED COI-:'Y AS'
I-,,.' LJ N
RUN
14:LIN
RUN
RUN
R U N
RLJN
R tJ N
RUN
i';: U N
RUN
R tJ N
I:( L.I N
F: [J iq
I:,'. LJ i'4
RUN
F'..' LJN
t:(tJ M
1.;,'ECEIF"I" 01:' DAf'A.
i,
t,
t,
i,
t,
i,
i,
t,
i,
5"
5"
.5"
5"
i
..2
,,
RECEIVED BY '
HAVE A NICE DAY! - ' ~
"r,;:nN$ ~-8855!.¢ .
A P F'R 0 V E D ...... ~ Alaska 011 & Gas Cons. Commission
Anchorage
O 13"f' R I B U 1' I O N
4L .h.
-.- CENTRAL 1.:' 1 LES' -.- Pl.'Ii LL I F'$
~-.- CHEVRON F'Z{ WELl..
D & iq R & D
¢ EX'fEN3'ION EXF'LOF;:A f' L Oi"~ :~ £'AF'C
¢: [.'XXON ~: 3"f A'I'E 01::'
i'd A R A T I-! 0 N "~ T E X A C 0
:k*.' HOB ~ L.
G EL A R
3'CH
GEAR
A T L A 5.'
CAMCO
CAMCO
G E:- A
Al LA3'
A f' L. A
C g t'i C 0
E; A ~'i C 0
U t.~ ri C U
L;RtlL;EI
CAMCO
CAHL;u
GEAR
STATE OF ALASKA
ALAS,.,, OIL AND GAS CONSERVATION COM, $SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ~ Stimulate_~ ~ Plugging ~- Perforate - Pul+.~l)ing X;
Alter Casing ~ Other ~X WORKOVER
2. Name of Operator
ARCO Alaska, Inc.
.
Address
P.O. Box 100360, Anchorage, AK 99510-0360
Location of well at surface
937' FSL, 1531' FWL, Sec.31, TllN, R15E, UM
At top of productive interval
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At effective depth
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At total depth
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
5. Datum elevation (DF or KB)
RKB 22 '
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
PWDW 1-1
8. Approval number
8-365 & 8-562
9. APl number
50-- 029-20226
10. Pool
Cretaceous- Undefined
Feet
11. Present well condition summary
Total depth: measured
true vertical
6640'MD feet Plugs (measured) None
6640 ' TVD feet
Effective depth: measured 6505 'MD feet Junk (measured) None
true vertical 6505'TVD feet
Casing Length Size Cemented Measured depth
Conductor 75 ' 20" 150 sx Arcti cset 75 'MD
Surface 2596' 13-3/8" 4200 sx Arcti cset 2596 'MD
Production 6567' 9-5/8" 500 sx Class G & 6593'MD
725 sx Arcticset
True Vertical depth
75 ' TVD
2596 'TVD
6593 ' TVD
Perforation depth: measured 5926'-5936'MD, 5943'-5960'MD, 5969'-6004'MD
6157'-6167'MD, 6296'-6316'MD, 6376'-6388'MD
true vertical
5926'-5936'TVD, 5943'-5960'TVD, 5969'-6004'TVD
6157'-6167'TVD, 6296'-6316'TVD, 6376'-6388'TVD
Tubing (size, grade and measured depth)
7"/4½", L-80/C-75, tbg w/tail ~ 3350'
Packers and SSSV (type and measured depth)
Baker FB-1 pkr @ 3235', Otis RPB SSSV ~ 2190'
12.
Stimulation or cement squeeze summary
N/A
Intervals treated (measured)
Treatment description including volumes used and final pressure
13.
N/A
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
14. Attachments (Workover Well History)
Daily Report of Well Operations ~
Copies of Logs and Surveys Run ?;
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Form 10-404 Rev. 12-1-85~
Title Associate Engineer
(Dani) SW03/025
Date ~//~-/~.~
Submit in Duplicate
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Instructions: Prepare and submit the "Initial Rel;ort" on the first Wednesday after a well ,s spudded or workover operations are started.
Daily work prior to spudding should be summarized on the form giving inclusive dates only,
District
Field
ARCO Alaska, Inc.
County. parish or borough
NORTH SLOPE
Lease or Unit
ADT,: 28326
Title
WORKOVER
PRUDHOE BAY FIELD
Auth. or W,O. no.
AS2271
State
AK
PWDW 1-tWell no.
Operator
ARCO
Spudded or W.O. begun
ACCEPT
Date and depth
as of 8:00 a.m,
07/19/88 (
TD: 6593
PB: 6505
SUPV:RB/MD
07/20/88 (
TD: 6593
PB: 6505
SUPV:RB/MD
07/21/88 (
TD: 6593
PB: 6505
SUPV:RO
07/22/88 (
TD: 6593
PB: 6505
SUPV:RO
API: 50-029-20226
07/19/88
]H°u~0500 HRS
IARCO WI
0 ,0000
Prior status if a W.O.
Complete record for each day reported
WESTWARD RIG 1
RIGGING UP
MOVED RIG FROM DS 11-12 TO PWDW 1-1.
07/19/88. RIGGING UP.
MW: 8.5 SEAWATER
ACCEPTED RIG @ 0500 HRS
DAILY:SO CUM:SO ETD:SO EFC:$270,000
TESTING BOPE MW: 8.4 SEAWATER
FINISH RIGGING UP. ND TREE, NU BOPE. PULL BPV, INSTALL
BLANKING PLUG. TEST BOPE TO 2100 PSI. SPEARED HANGER AND LD
SAME. DISPLACED TUBING AND ANNULUS WITH SEAWATER. POOH, LD
4-1/2" TUBING. INSTALL 7" RAMS. INSTALL BOPE TEST PLUG AND
ATTEMPT TEST W/O SUCCESS. LD TEST PLUG. INSTALL TUBING HANGER
WITH BLANKING PLUG AND ATTEMPT BOPE TEST.
DAILY:S47,906 CUM:$47,906 ETD:S47,906 EFC:$270,000
DRILL LOCKDOWN SCREW MW: 8.4 SEAWATER
FIN TESTING BOPE TO 3000 PSI. LD 4-1/2" HANGER. DISPL 7" X
9-5/8" W/SEAWATER. MU RETRIEVING TOOL AND RETRIEVE 7" PACKOFF.
PU LANDING JT AND ENGAGE 7" CSG HANGER. PULL HANGER AND LD SAME.
PULL AND LD 51 JTS 7" CSG. RETRIEVE 9-5/8" PACKOFF AND INSTALL
NEW PACKOFF. PACKOFF WOULD NOT TEST. BROKE ONE LOCKDOWN
SCREW WHEN TIGHTENING SAME. BACKED OUT ALL SCREWS AND
BROKE A SECOND SCREW. SET 9-5/8" RTTS AND STORM VALVE @
90'. DRILL OUT BROKEN LOCKDOWN SCREWS.
DAILY:S38,362 CUM:$86,268 ETD:S86,268 EFC:$270,000
RIH W/7" TUBING MW: 8.4 SEAWATER
DRILL OUT LOCKDOWN SCREWS AND INSTALL NEW PACKOFF. TEST
9-5/8" AND 13-3/8" PACKOFFS TO 3500 AND 2000 PSI. RIH,
STING INTO RTTS AND ATTEMPT TO TEST 9-5/8" CASING W/O SUCCESS.
POOH W/RTTS AND PU FO CLOSING FINGERS. RIH, CLOSE FO. TEST
9-5/8" CASING TO 2500 PSI. POOH, LD RTTS. MU 7" MCEVOY
HANGER AND LAND IN TUBINGHEAD. TEST HANGER TO 3000 PSI.
LD HNGR. MU BAKER SEAL ASSEMBLY ON 7" TUBING AND RIH.
DAILY:S36,247 CUM:$122,515 ETD:S122,515 EFC:$270,000
The above is correct
For form prg/l~ration and distribution,
see Procedl~s Manual, Section 10,
Drilling, Pages 86 and 87.
ASSOCIATE ENGINEER
ARCO Oil and Gas Company'.~,
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or welt is Plugged. Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided The "Final Report" form may be used for reporting the entire
operation if space is available.
District County or Parish
ARCO Alaska, Inc. NORTH SLOPE
Field Lease or Unit
PRUDHOE BAY FIELD I ADL: 28326
Auth. or W.O, no. I Title
AS 2271 [ WORKOVER
API: 50-029-20226
fAccounting cost center code
State
AK
PWDW 1-1[well no.
Operator AR.Co. W.I.
ARCO 0. 0000
Spudded or W.O. begun
ACCEPT
Date and depth
as of 8:(30 a.m.
07/23/88 (
TD: 6593
PB: 6505
SUPV:RO
Date
07/19/88
Complete record for each day reported
WESTWARD RIG 1
I otal number of wells (active or inactive) on this
DSt center prior to plugging and I
bandonment of this well
I
our IPrlor status if a W.O.
I
0500 HRS
i) RIG RELEASED MW: 8.4SEAWATER
FINISHED RUNNING 7" TBG AND STUNG INTO PKR. OTIS 'RPB' SSSV
@ 2190', BAKER 'FB-i' PKR @ 3235', & TT @ 3350'. PRESS ANN TO
2500-PSI TO VERIFY. SPACED OUT TBG AND LANDED TBG HANGER. DISPL
TBG W/125 BBLS DIESEL AND ALLOW TO U-TUBE INTO ANN TO FREEZE
PROTECT. TESTED TBG TO 3000 PSI AND ANN TO 2500 PSI. ND
BOPE AND NU TREE. TESTED HANGER SEALS AND TREE TO 5000 PSI.
INSTALL BPV AND RELEASED RIG @ 0200 HRS 7/23/88.
DAILY:S193,634 CUM:$316,149 ETD:S316,149 EFC:$270,000
Old TD
Released rig
New TI3
Date
IP8 Depth
Kind of rig
Classifications (oil, gas, etc.)
Producing method
IType completion (single, dual, etc.)
Official reservoir name(s)
Potential test data
Well no. Date Reservoir Producing Interval Oil or gas Test time Production
Oil on test Gas per day
,.
Pump size, SPM X length Choke size T.P. C.P, Water % GOR Gravity Allowable Effective da',e
corrected
The above is correct
~ ]Date
Signature ,'
For form prepara~4n and distribution,
see Procedures I~.~nual, Section 10,
Drilling, Pages 86 and 87.
ASSOCIATE ENGINEER
STATE OF ALASKA
ALASK~ OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Q Suspend [] Operation Shutdown [] Re-enter suspended well ~ Alter casing
Time extension [] Change approved program~,~Plugging ~ Stimulate ~. Pull tubing [] Amend order ~ Perforate ~ Other
2. Name of Operator 5. Datum elevation (DF or KB)
ARCO Alaska, Inc. RKB 22'
3. Address 6. Unit or Property name
P. 0. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit
4. Location of well at surface
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At top of productive interval
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At effective depth
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At total depth
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
7. Well number
PWDW 1-1
8. Permit number
76-62
9. APl number
50--02 ~- 20226
10. Pool
Cretaceous - Undefined
11. Present well condition summary
Total depth: measured 6640 ' MD feet
true vertical 6640 'TVD feet
Plugs (measured) None
Effective depth: measured 6505 'HD feet Junk (measured) None
true vertical feet
6.505 ' TVD
Casing Length Size Cemented
Conductor 75' 20" 150 sx Arcticset
Surface 2596' 13-3/8" 4200 sx Arcticset
Production 6567' 9-5/8" 500 sx Class G &
725 sx Arcticset
Circ. String 2296' 7" N/A
Measured depth ~ueVerticaldepth
75'MD 75'TVD
2596'MD 2596'TVD
6593'MD 6593'TVD
2319'MD 2319'TVD
Perforation depth: measured 5926 ' -5936 ' , 5943 ' -5960 '
6157'-6167', 6296'-6316'
truevertica15926,_5936,, 5943'-5960'
6157'-6167', 6296'-6316'
Tubing (size, grade and .measured depth)
4-1/2", 12.7#/ft, C-75 tubing w/tail ~ 3350'
Packers and SSSV (type and measured depth)
Baker "FB" pkr~ '3235', Otis "RQB" SSSV ~ 21 86'
12.Attachments
, RECEIVED
,6376'-6388'
,5969'-600',',JUL
, 6376' 6388' ~a$~ 0il & Gas Cons. Comr~issio~
'"' A;~ch0ra~e
Description summary of proposal ~ Detailed operations program [] BOP sketch
13. Estimated date for commencing operation July 20, 1988
14. If proposal was verbally approved
Name of approver Mike Minder, AOGCC
Date approved 7-13-88
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
~ Commission Use Only ( J G )
Date
SA3/93
ConditionS of approval
Approved by
Notify commission so representative may witness
[] Plug integrity [] BOP Test [] Location clearance
~Pproved Copy
Returned
.... --q
Commissioner
0RtGLNAL SIGNED ElY
&~IE C. SMITH
by order of -/ 5'/ ~/7
the commission Date /%x'/ 'd;' ,.~-
feet
Form 10-403 Rev 12-1-85
Submit in triplicate
PWDW 1-1
Application for Sundry Approvals
ARCO Alaska, Inc., proposes to change the approved program, dated 5-4-88, as
fol 1 ows'
(1) MIRU Westward. ND tree. NU BOPE & test to a maximum of 2700 psi in
order to minimize the shear stress on the tubing hanger support pins.
(The BOPE will be retested after the 4-1/2" tubing has been pulled.)
Maximum expected surface pressure = 2700 psi
Initial BOPE test pressure = 2700 psi ±
Final maximum BOPE test pressure = 3000 psi ±
SA3/93.2
ANNULAR
PREVENTER
6
PIPE RAILS
5
TUBIN6
HEAD
;5
1. 13-3/8" CASING HEAD
2. 9-5/8" CASING HEAD
3. 5000 PSI TUBING HEAD
4. 13-5/8" - 5000 PSI BLIND RAMS
5. 13-5/8" - 5000 PSI PIPE RAMS
6, I;5-5/8" - 5000 PSI ANNULAR
ACCUMULATOR CAPACITY TEST
I. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2, ASSURE THAT ACCUMULATOR PRESSURE IS ;5000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
P, ECEi VED
JUL
BOP STACK4 .'fi1 , as Cons.
1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL.
2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS,
7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES.
8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM
PRESSURE TO ZERO PSi TO TEST VALVES. TEST REMAINING UNTESTED
MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOW~ISTREAM. BLEED SYSTEM TO ZERO PSI.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED
TO ZERO PSI.
10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND
LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 5000 PSI.
12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP,
13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SI(~N
AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY,
: , It~. kll"lVC'Ml:t,l:'O ~ ! 1 Q,g,~,
STATE OF ALASKA ~'~'
ALASK,-, OIL AND GAS CONSERVATION COMM._31ON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate ~ Pull tubing ,~ Amend order [] Perforate ~ Other
2. Name of Operator 5. Datum elevation(DF or KB)
ARCO Alaska, Inc. RKB 22'
3. Address 6. UnitorProperty name
P. 0. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit
4. Location of well at surface
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UH
At top of productive interval
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UN
At effective depth
937' FSL, 1531' FWL, Sec.31, T11N, R15E, UM
At total depth
937' FSL, 1531' FWL, Sec.31, TllN, R15E, UM
7. Well number
PWDW 1 - 1
8. Permit number
76-62
9. APInumber
50m 029-2022~
10.~oolc~¢~- ~~_~
":L""~hee B~¥-~3ql ?~ol .
11. Present well condition summary
Total depth: measured
true vertical
6640 ' MD feet
6640 ' TVD feet
Effective depth: measured 6505 ' MD
true vertical 6505 ~ TVD
Casing Length Size
Conductor 75 ' 20"
Surface 2596 ' 13-3/8"
Producti on 6567 ' 9-5/8"
Circ. String 2296' 7"
Plugs (measured) None
feet Junk (measured) None
feet
Cemented
150 sx Arcticset
4200 sx Arcticset
500 sx Class G &
725 sx Arcticset
N/A
Measured depth
75'MD
2596'MD
6593'MD
2319'MD
~ue Verticaldepth
75'TVD
2596'TVD
6593'TVD
2319'TVD
Perforation depth: measured 5926 ' -5936 ' , 5943 ' -5960 ' , 5969 ' -6004 ' ,
6157'-6167', 6296'-6316', 6376'-6388'
true vertical 5926 ' -5936 ' , 5943 ' -5960 ' , 5969 ' -6004 ' ,
6157'-6167', 6296'-6316', 6376'-6388'
Tubing (size, grade and measured depth)
4-1/2", 12.7#/ft, C-75 tubing w/tail ~ 3350'
akersand SSSV (type and measured depth)
aKer "FB" pkr ~ 3235', Otis "RQB" SSSV ~ 2186'
12.Attachments
Description summary of proposal ~ Detailed operations program
BOP sketch
feet
13. Estimated date for commencing operation
June 25, 1988
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~~')~~'bLL~ TitleAssociate Engineer
Commission Use Only ( J G )
SA3/93
Date
Conditions of approval
Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] Location clearanceI
Approved by ~~, ~'~, ~~-~'
Form 10-403 Rev 12-1-85
· ~pDroved Copy
Returned
Commissioner
the commission Date
Su)bmit/in triplicate
APPLICATION FOR SUNDRY APPROVALS
PWDW 1-1
WORKOVER PROCEDURE
OBJECTIVE: The purpose of this workover is to remove the existing 4-1/2"
production tubing and 7" glycol/water circulating string and replace them
with a 7" production tubing string and 7" 5M tree. The existing perfora-
tions will be isolated via wireline set blanking plug in the existing packer
tailpipe. The packer will not be replaced, however, the 9-5/8" wellhead
packoff will be replaced. Perforations will be added within the existing
perforated interval following the workover. Fill in the 9-5/8" casing below
the packer will be circulated out via coiled tubing prior to the workover.
1) RU slickline. Pull the 4-1/2" SSSV.
2) RIH w/Otis "PXN" blanking plug on "XN" lock and lock plug in "XN"
nipple at 3317'MD. Pressure test plug to 3000 psi.
3) POOH, RD slickline.
4) RU electric line. RIH, perforate 4-1/2" tubing above Baker packer at
3210'MD. POOH, RD electric line.
5) MIRU. Displace the 4-1/2" x 7" x 9-5/8" annul i with seawater. Set
BPV. ND tree. NU BOPE and test. Retrieve BPV.
6) Release 4-1/2" tubing from packer and POOH. LD 4-1/2" tubing and
tubing hanger.
7) Pull 7" mandrel hanger packoff and engage 7" mandrel hanger. POOH, LD
7" hanger and 7" circulating string.
8) Close blind rams, pressure 9-5/8" casing to 2500 psi for 30 min. If
9-5/8" casing will not hold pressure, PU 3-1/2" DP and 9-5/8" RTTS and
isolate 9-5/8" casing leak. Check FOs at 2336 'MD and 2466 'MD first.
9) MU new seal assembly on 7", 26#, L-80 LTC 8rd tubing and RIH. Sting
into Baker packer. Space out and land hanger. Test annulus and tubing
to 2500 psi and 3000 psi, respectively.
10) Set BPV. ND BOP. NU new 7" 5M tree and test.
11) RD, RR. Pull BPV.
12) RU slickline. Retrieve "PXN" blanking plug. Run SSSV.
13) Production will add perforations after rig release.
Bottomhole pressure' 2647 psi @ 5990'TVD (8.53 ppg)
·
Workover fluid' Seawater · ~'
DCS/27a
4/28/88
ANNULAR
PREVENTER
6
BLIND RAMS
4
TUBIN6
HEAD
1. 13-3/8" CASING HEAD
2. 9-5/8" CASING HEAD
3. 5000 PSI TUBING HEAD
4. 1:3-5/8" - 5000 PSI BLIND RAMS
5. 13-5/8" - 5000 PS! PIPE RAMS
6. 1:3-5/8" - 5000 PSI ANNULAR
ACCUMULATOR CAPACITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS :3000 PSI WITH
1500 PSi DOWNSTREAM OF THE REGULATOR.
:3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL.
2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS.
7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES.
8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM
PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED
MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED
TO ZERO PSI.
10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND
LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 5000 PSI.
12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP.
1:3. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN
AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY.
dG NOVEMBER 21, 1986
P.O, BOX t00S60
ANCHORAGE, ALASKA
99.5 t 0
DATE- 2-t 8-88
REFERENCE: AR
t-29 2-t0-88
5-7 t-30-88
5-t2 t-SG-88
5-16 t-S0-B8
t 6-t 6 2-2-88
I 6-t 9 ~ -28-88
t6-20 t-~.9-88
' i 7-2 t -St -8~
F'WDWt -t~ t -i t -88
PLEASE SIGN AND
CO PRES~IJRE DATA
BHP-PRESSIJRE BI.IIi...DUP
BHP-~TAT~C GRADIENT
BHP-~TATIC ~RAD~ENT
BHP-~TATTC GRADIFNT
BHP-STATIC GRADIENT
BHF'-FLOWTN~ GRADIENT
BHF'-FI..OWTNG GRADIENT
BHF'-FL_OW~N~ ~RADIENT
BHP-£TAT~C G~ADIFNT
RETURN THE'ATTACHED
RFDETPT OF DATA~
CAMCO
CAM£O
CAMCO
CAMCO
CAMCO
RECEIVED BY
HAVE A NICE DAY!
PEGGY BENNETT
AT0-i529
TRANS ~88tiS
APPROVED
DISTRIB!.ITTON
CENTRAL FILES
CHEVRON
D & M
EXTENSION FXF'LORATION
EXXON
MARATHON
MOBIL_
F'HII._I._IF'S
F'R WEI. I... FILES
R & D
SAPC
_
~TATE OF ALASKA
TEXACO
P.D. ~OX ~Ge36G
ANCHORAGE, AI_A~KA 995~G
DATE: 2-~7-8R
REFERENCE: ARCO CA£ED HOLE FINAl._
t-t5 t-2t-88 PRD,PRFLE/FM/TP/FD/W RIJN t , 5'
'1 ::;-'~ '1 -22-88 PR'D, PRFL. E/HPFM/WHI. IT RI. IN 'i, ..5'
7-28 2-t 0-88 CBL RIJN t , 5'
:~~,~;~ 2-8-88 TEMF'ERAT[.IRE/.gF'INNER' .~'I.JF,'VEY RLJN 'i , 5'
PLEA.~E SIGN AND RETURN THE ATTACHED~j~gCOPY RECEIPT OF DATA.
HAVE A NICE DAY
PEGGY BENNETT
ATO-~ 52~
TRAN~ ~SR
APPROVED
DI~TRIBI!TION
CAMCO
CAMCO
~CH
~CH
~ CENTRAl_ F ! I._E_9
~ CHEVRON
D & M
$ EXTEN,.X"I ON EXPLORATION
-,,-'"' EXXON
MARATHON
-,,-" MOBIl_
REFEREWC
A~CO CA~ED 14ill F FTNAI..
F'ITF101.l F:T T fi i'.J F'F,:[] F T I. F/.~ P T i',~ ,: T F-H F'
F'!!HP-'rN 'TFNF't.rI~:ATI
P T T.%,,'TF. NP
F'ITF1DI IET'FrlN PpnF'rl. -I:/I-tF'F-~-i...."t-,F~:
F'F;:FiD! !I~.T Tfliq F'R'FI~T t .E' ,"I)FiFJ~ T TY/'I'F'i'~P
F'R'f~D! I~Z'T'r[~i',~ PF,,'F1F'[I I:/t.-tF'F-H,,'TFNF'
1' FI..J F F: T 11 fl ig P r4: f'/[: l' I I: / ,~ F' T FJ bJ F' F,'
I:'RF1DI IF'.TTF1N F'R'I'qF'[I Ir.,''IqPFM-lal41 IT
F:' E' ri O I ! F'.' 'T T F1 ig F' R Fi F' T I. I:' /.% F' '[ ig i'.J ~::'-F,.'
F'Rt-IDItF:.TTi'-/i,J PF.'F1F:'TI F/.'<:F'TFJFJF-I~:
6.AHN~ 17~Y/'T"[F:'-.l'FJ I Fi
~Ai'-di'4A RA"¢/TI'F'-TN I. F1G
'F:, '[ ;,.".TR' T Tq! IT T f',' i"-J
DATA
¢. A N F: fl
f? A i'4 fl f'i
F: A i'fi f'. Fl
F: A Pi f-: ~'-I
f". A i'4 F: ;q
F: A H fi.. I"i
F: A i'-t f": Fi
,i
,Jtme 1.9, ].979 -
]~el. Ct CDC -
EnclOsed are the following cased hole ].ogs'
~ 9-16 ~I!)T · 11/22/7'8
l_)~c~ 3 6 C'/O '2/20/79
~I)S 3 6 FI. Dens. 2/19/79
3-8 C/O 2/14/79
51.4-6 CNI, 3/25/79
3-7 'I'])T 10/i. 3//8
s- 2 'H)T. ]_~/~0/78
13-3 CNL 3/17/79
1~-4 CR ~/30/79
3-6 . TDT 10/17/78
7-~i ..... CNL 3/27/79
Si))cel'Cl)', ~
V,G. ReJme.rs
Nort. h ]Mgi.neering
TRANS?,IITI'AL It 18 7
D].S'J'R11-P.£i']
Nor i-Il (1(;o] ogy ]i.--,:xoi~
] )J::J. '11 :i 1'11.;
J.".'i"'
,:,. ,. ........ ,,... ('.,..:.,-.;.~ 1'):
l'. & D Soh-i o
{ ,.: :o]o-.,. ,.,,'"' ~:ia ra-1 '~.,,o p.
,q't-:~ t:.,.: of.' :\] as],::~ l'h i. ] 1 i i.,.-'-;
1~ & t,I Chev
AtlanticRichfieldCompany
·
North Ar--~L~an prOducing Division
North A, ;)istrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
July 1.1, 1977
Mr. Hoyle Hamilton
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject:
Dear Sir:
NGI 10 ~(22-01-11-14) Permit No. 76-69
~(24-31-11-15) Permit No. 76-62
PWDW 2-1 (42-33-11-15) Permit No. 7'6-63
Enclosed please find our Sundry Notice of Subsequent Report
detailing the v~rk done on the above-mentioned wells.
Very truly yours,
Frank M. Brown
District Drilling Engineer
/am
Enclosure
/ , ·
Submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
Form 10-403
REV. 1-10~73
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
OTHER Produced Water Disposal Well
2. NAME OF OPERATOR
Atlantic Richfield Company
3. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, Alaska 99510
4. LOCATION OF WELL
At surface
937'N & 1531'E of SW cr
Sec. 31, TllN, R!5E, UM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
22' RKB
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20226
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28236
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELL NO. Pruduced Water Disposal
Well 1-1 (24-31-11-15)
10.._.FI EL~D A N D_.POO I~ O R.W~I L DCAT
~L~CLrZO~ ~.~ ~'lelCl
Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 31, TllN, R15E, UM
12. PERMIT NO.
76-62
)ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) p~f~-~ ~-~
(NOTE= Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all Dertlnent details, and give pertinent dates, Including estimated date of
starting any proposed work.
Began perf o.~perations @ 0600 '~s 6/19/77. Tstd tree, csg & wireline BOP's. ,, Pulled dunmrf
valve. Perf'd intervals 6376' ~- 6388' , 6296' -'~ 6316'· , 6157' '2 6167' , 5984'
.SR6R' - 5984', 5950' -~-; 9~', 5947' - 5950', ~9_4/L' - 5947', 5926' -~'5936' w/4 shots per
ft. Ran step rate injection, tst w/8.5 CaC12 w~r. Ran dummy val~e. Tstd balance
& control lines to 5000 psi OK. Installed
& tstd tree cap to 5000 psi OK. Released 'well to Production Dept @ 0100 hrs 6/25/77.
16. I hereby certif~y that the foregoing is true and correct
District Drilling Engineer
DATE..
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE.
DATE
See Instructions On Reverse Side
Aflant[cRichfieldCompany
North Amer~"'~n Producing Division
North Alas~. Jistrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
May 25, 1977
Mr. Hoyle Hami 1 ton
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Subject' Produced Water Disposal Well #1-1 (24-31-11-15)
Permit No. 76-62
Dear Sir-
Enclosed please find Sundry Notice outlining our
change of plans for the above-mentioned well.
Very truly yours,
Frank M. Brown
District Drilling Engineer
/kb
Encl os ure
Form 10-403
HEY, 1-10-73
.,
Submit"lntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
~' OW~L~Lr--1WELLGAS n-I OTHER Produced Water Disposal Well
2. NAME OF OPERATOR
Atlantic Richfield Company
3- ADDR~S OF OPERATOR
P. O. Box 360, Ancho?age, Alaska
LOCATION OF WELL
At su dace
937'N & 1531'E of SW cr
Sec. 31, TllN, R15E, UM
99510
13. 'ELEVATIONS (Show whether DF, RT, GR, etc.)
22' RKB
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28236
7, IF INDIAN. ALLOTTEE OR TRIBE NAME
8. UNIT. FA~RM OR LEASE NAME
,. Prudhoe. Bay
9. WELLNO. Produced Water Disp0sal
We!! !~1 (24-31-11,15)
10. FIELD AND PO'OL, OR WILDCAT '
Prudhoe Bay Fi el d
11. ~l~.~.,ul~.~,~[;~.,' I~t~.,~ (bC~'(f~l~/1 HOLE OBJECTIVE)
Sec. 31, TllN, R15E, UM
PERMIT NO.
76-62
3crt, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDiZING ABANDONMENT*
(Other)
(NOTE= Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent datesf Including estimated date of
starting any proposed work.
Atlantic Richfield Company proposes to perforate the following intervals:
5926'-5936'; 5943'-5960'; 5969'-6004'; 6157'-6167'; 6296'-6316'; and 6376'-6388'
instead of interval 3505' to 3596' All intervals are still in the Cretaceous
Sand intervals. By starting with ~eeper intervals than originally specified we
should be able to stay further away from any possible shallow fresh water zones
as well as have the chance of perforating higher intervals at a later date in
case these lower intervals should plug off during injection of produced waters.
This perforating could be done without a workover rig whereas if the original
interval were used and then plugged off, a workover rig would be required. A
5000 'psi WP wireline lubricator, tested to working pressure, will be utilized
with all wireline work. All perforations will be made with hollow carrier
type guns at 4 shots per foot. A short term injection test will be done 1i9 i'~
determine that the perforated intervals are open and taking fluid. ~: ~:-'~ "~ ;' ~''
Estimated Start Date June 1, 1977.
16. I hereby certify that the foregoing is true and correct
DATE
(T his space for St at~iflc~2se)
CONDITIONS O.~PPROVAL, IF ANY=
CATE
See Instructions On Reverse Side
- /
"""" rill n ,,,.,, nx,
/
,
/ Pouch 0- Juneau
November 17, 1976
99811
~!r W.P. ~Ietz
Atlantic Richfield Company
North American Production Company
North. A~aska District
P.O. Box 360
~chorage, Alaska 99510
De ar Mr. Metz:
· R]aank you for your letter of October 6, 1976, concerning.the wastewater
disposal permits for the wastes from Flow Statio~l~nd 2 at Prudhoe
Bay,
Alaska. You are correct in stating that under current~---~' regulations a ~a~;te
disposal permit is not required for these activities. We do anticipate
revising our regulations so that they will require a permit for the reinjection
· of produced waters. Until that time we will keep your.application on file.
Sincerely,
Ronald G. Hansen, Chief'
Water Pollution Control Section
cc: Hoyle Harailton
RECEIVi .D
Anchora¢~
AtlaflticRichfieldCompany
North Ame.m.~n Producing Division
North Alas~ Jistrict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
February 18, 1977
Mr. Hoyle Hamilton
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Subject' Produced Water Disposal(24-31-11-15)
Permit No. 76-62
Produced Water Disposal Well 2-1 (42-33-11-15)
Permit No. 76-63
Dear Si r'
Enclosed please find Sundry Notices outlining our perforating
plans for each of the above mentioned wells.
Permission for disposal of produced Sadlerochit Formation water
and utility wash down water (no more than 5% of total injected
fluids) is hereby requested as per stated in llAAC 22.250.
Injection would start at the time when the field comes on
production at start up of flow to the pipeline.
Injection would be into tertiary aged Z sand and geologic
data indicates that there are no fresh water sands in the
area which might be contaminated.
A copy of the Department of Environmental Conservation
letter from Mr. Ronald G. Hansen concerning their ruling
on these wells is attached for your convenience.
Very truly yours,
Frank M. Brown
District Drilling Engineer
FMB/CER/jw
Forrh 10-403
REV. 1-10-73
Submit °*Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
5. APl NUMERICAL CODE
50-029-20226
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28326
1. OIL r=~ GASF-1 Produced Water Disposal Wel 1 7. IF INDIAN. ALLOTTEE OR TRIBE NAME
WELLI I WELL L__J OTHER
2. NAME OF OPERATOR
Atlantic Richfield Company
3. ADDRESS OF OPERATOR
P. O. Box 360, Anchorage, AK 99510
LOCATION OF WELL
At surface
937'N & 1531'E of SW cr Sec 31, TllN, R15E, UM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
22'RKB
Check Appropriate Box To Indicate Nature of Notice, Re
14.
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay
9. WELLNO. ProduCed Water Disposal
Well 1-1 (24-31-11-15)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec 31, TllN, R15E, UM
12. PERMIT NO.
76-62
)orr, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR AClDIZE
REPAIR WELL
(Other) Perforate
PULL OR ALTER CASING g-..J
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work. ..
Atlantic Richfield Company proposes to perforate the interval 3505' - 3596'.
A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized
with all wireline work. All perforations will be made with hollow carrier type
guns at 4 shots per foot.
Short term injection test will be done to determine that the perforated
interval is open and taking fluids.
Estimated Start Date- May l, 1977.
16. I hereby certify that the foregoing is true and correct
(Thi~ space for St~ o~f ce use) _ ~
TITLE District Drillin9 Engineer DATE.February 18~ 1977
CONDITIONS ~PPROVAL, IF ANY:
See Instructions On Reverse Side
DATE
~,Pproved Copy
Returned
To:
ATLANTIC RICHFIE~
North Ala~ka Distriet.Engineem..n_~
[.kJi~li'l~i2./It~l- T R i X S M I T T A L
DISTRIB~ED TO~
STATE OF
DIVISION OF OIL
Date' Dec. 15, 1976
From:
J. A. Rochon/p. Hellstrom
Well Name' h%ter Disposal 1-1
Transmitted herewith are the follmving for the subject well:
Run No. .. Scale Xerox
I
·
1 2"&5"
1 5"
1 2"&5'! _
...
BHC Sonic/Caliper Log
BHC Sonic/Caliper - Gamma Ray Log
BHC Sonic/Gamma Ray Log
Caliper/CCL
Cement Bond Log/VDL
Compensated Formation Density Log(GG)
Compensated Neutron-Formation Density
Compensated Neutron Log
Core Analysis - Interval
Core No.
Core Description [SWC) -'Interval
Core Description [Cony.) - Core No.
Directional Survey- Gyro
Singl'~ ~;h'°t'''
~ltishot
Drill Stem Test - Test No.
Dual Induction Laterolog
Formation Density Log
Formation Density Log/Gamma Ray
G mn~na Ray/CCL
Laterolog
Location Plat
Microlaterolog
5iicrolog
Mudlog- Interval
Sample Log (A.R.Co') -Interval)
Synergetic Log
TVD-DIL
TVD-P, orosity Log
CCL/. Dunany,. Gun
Cement B°nd log
Borehole Geomet_~. Log
Sepia BL Line
Receipt Acknowledged For:
Date'
Please return receipt to'
AtlanticRichfieldCompany
North American P~od,cing Division
North Aiask~'~ ~stdct
Post Office ~..~ 380
A~chorage, A~aska 995~0
Telephone 907 277 5637
October ll, 1976
Mr. Hoyle Hami 1 ton
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject' Produced Water Disposal Well #1-1
Dear Sir:
Enclosed please find the Completion Reports, Drilling
Histories and Survey Plat for the above mentioned
well.
Very truly yours,
District Drilling Engineer
CRK/jw
Enclosures
SUBMIT IN D~. .E*
STATE OF ALASKA ~s~ .... ~h,,r~,,-
s~ l'Lh't lobs oI~
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
1~. TYPE OF WELL: OiL ~] ~AS ~ water Ois os~l
WELl. WELL =_~ DRY Other
b. TYPE OF COMPLETION:
WELI. OVER EN BACK RESVR. Other
2. NAME OF OPERATOR
Atlantic Richfield Company
ADDRESS OF OPERATOR
P. O. Box 360, Anchora_qe, Alaska 99510
LOC~T~OX OF WgLL (Report location clearly and in accordance with a~y State requirements)*
At surface
937'N & 1531'E of S~o.Cr Sec 31 TllN R15E UM
At top prod. interval reported ~ ~ ~
Same as Surface
At total depth
Same as Surface
5. API NUM_Ei~ICAL CODE
50-029-20226
6. LEASE DESIGNATION AND SERIAL biO.
ADL 28326
7.iF INDIAN, ALLOTTEE OI{
8. UNIT,FAIL1VI OH LEASE NAME
9. ~,V,F,&,L I'~O. _
~roaucea Water Disposal
W~ll 1-1 (~4-31-11-1~/
~o. ~[~ ~ ~boC[0i~ ~O~d~ '
Prudhoe Bay
11. SEC., T., R., M., (BOTTOM HOLE
Ot.~ E C~I'I V E )
Sec 31, TllN. R15E
12. PEri, IT NO,
76-62
9/10/76 9 21/76 9/28/76 22' RKB ~.~';. , ,,
~-~OWIVIA.NY* ROTARY T00LF. CAHI,E Tt)(3~,q
6640' MD 6505' MD Si ngl e A11
PRODUCINO ~.NT~RVAL(S), OF THIS CO~/iPLETION--TO,P, BOTTOM, NAME (MD AND WVD)* ,23. ~VAS DHIECTIONAL
! SUI~VEY MADE
No
24. TYPE ELECTF, IC AND OTHER LOGS RUN
DIL, BHCS/GR, FD, C/GR~ 4 arm Caliper~ CNL/GR/CCL
25.
CASING RECORD (Report all strings set i:x well)
20" ' 94# ! H-40'I 75' 2~" 1.~n q~
13-3/8" 72~ ButtiMN-80 2506'_ 17~" 4200 sx Arc¢~c Set
,,, 0a_9 ..... I '
26. LINEN EECO~ ~ 27. 5(UBING
5" pro 3350' 3235'
~'i"'PERFORATkONS OP~ TO PRODUC~ON (interval sl~ze and number)' 20. ACID. Si:CT, ~';t,kC'[ URE, C~,IENT SQULi:i:Z:.:, 'E'['C
;'~ DSnI'li 1NT~V.~ (MD) A?,I(oUNi' AND I.,_!NI) OF MA'iEXiAL USED
NA
i ii iii i i1~
30. ~O~UC~IO~
HOURS TEST~ '[CttOXE SiZE lPgOO'N FOR
DtTE OF T~ST, OI~BBL. G'~kS~RiCF. %r//I'EI~--BBL. (ihS-Oil* IL'<TIO
FLOW, TUBING CA~hNG PRESSURE [CALC~T~ OI~BBL. ' GAS--~TCF. WATt--BBL. [ OIL GRAVITY-~I (CORR.)
31. DISPOSITIONOF GAS (801d, u~ed ~or ]uei, vented, etc.)
W ITNESSgD BY
32. LIST OF tTT~CHMENTS
Dr~ll~n9 H~story, Survey Plat
33. I hereby, 'certify t~thffforegotng ~nd attached information is complete andcorrect as determined from all-available ree.rds
m i
~(See Instructions and Spaces [or Additional Data on Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report end log on
all types of lands and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
ments given in cther spaces on this form and in any attachments.
Items :20, and :22:: If this well is completed for separatc production from more than one interval zone
(multiple completion), so state in item 20, and in item 2.2 show the prc. Jucin9 interval, or intervals,
top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report
(pa0e) on this form, adequately identified, for each additional interval to be seperately produced, show-
ing the adkiitional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing and the location of the cementing tool. ,-¢~:
Item 28: Submit a separate completion report on this form for each interval to be separately producs¢l.
(See instruction for items 20 and 22 above).
'"34. SUMMAitY OF F~)RMA~ION TESTS IN('LUI)IN(; INTERV;L TF_.STED. I'HF. LSSURE DATA AND'RE, COVEI:tlF..S OF OILi GAS.
35. G li)OL, OG I (' M ARKIEI~ .
WATER AND MUD
NAI~ig
.36. CORE DATA. Aq'I'ACII FJ'RIEle l~C~.~!~l'I'IO'b,~ OF LIT'I:IOLOGY. POF~OSlTY, FIIAC~'URE~..APpA,~E~I~'~
ANI.I I-)E~I'£t.'TEI~ S~IOWS O~ tilL, G~S O~ WA~I.
. .-?..
, , , ..... , ,
rr. rr
25 30
36
TIIN
T ION
36
I
31
6
PROTRACTED
S'EC. CORNER
1531 FT
POSITION
Y= 5,946,033.78
X= 692,1 39.76
LAT. 70° 15' 25.530" N
LONG. 145° 26'49. 145" W
OF WATER WELL
WATER
DISPOSAL
WELL"-'.,
WW
30
Protracted Section Line
VICINITY MAP
I" = 2000'
5015.60
Y: 5,947,009.67
X: 693,646.48
LAT. ?0° 15' 34.745'"
LONG. 148° 26' 04.594"
N 88° 31
' 09"E
LOCAL FLOW STATION :¢¢ I
PLANT COORDINATES
N 5805.83
W 5392.26
NOTE
ALL BEARINGS AND DISTANCES ARE
ALASKA STATE PLANE ZONE 4.
CERTIFICATE OF SURVEYOR
I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED
AND LICEN.SED TO PRACTICE LAND SURVEYING IN THE
STATE OF ALASKA AND THAT THIS PLAT REPRESENTS
A LOCATION SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISIC~N, ANDALL DIMENSIONS AND OTHER DETAILS
ARE CORRECT.
DATE
SURVE ~'OR
31
32
ARCONo. AFE 293709 J HVL No 36-ES.I-76
ATLANTIC RICHFIELD CO.
AS--BUILT
WATER DISPOSAL
WE LL I- I
LOCATED IN S.W. I/4 OF
PROTRACTED SECTION 31~T. IIN.~R.15E., U.M.
PREPARED BY
HEWITT V LOUNSBURY 8~ ASSOC.
725 W. 6th AVE., ANCHORAGE, ALASKA
DATE 9/3 O/76
CHKD. BY GD
SCALE I" : 600'
FIELD BK.
32
ATLANTIC RICHFIELD COMPANY
Produced Water Disposal Well 1-1 (24-31-11-15)
API 50-029-20226, ADL 28326, Permit No. 76-62
Spudded well @ 1900 hrs 9/10/76. Drld 17½" hole to 2650'. Ran 68 jts 13-
3/8"72# MN-80 butt csg w/shoe @ 2596'. Ran DP & stabbed into Baker float @
2511' Cmtd 13-3/8" w/4200 sx Arcticset cmt. NU McEvoy speed head. Tstd
pkoff'to 2000 psi OK. NU BOP's & chgd rams to 5" DP. Tstd BOP's OK. Tstd
csg to 1500 & drld FC @ 2501', cmtd shoe @ 2596'. Washed to 2650'. Tstd
form to 0.65 gradient OK. Drld 12¼" hole to 6640'. Ran DIL, BHCS/GR,
FDC/G,R and 4 arm calipe,r. Ran 9-5_~_8" &,set @ 6593'. FC @ 6506', btm FO @
4400 , middle FO @ 2466 , t~-~ ~(~ @-'~36 . Cmtd w/500 sx Class G cmt.
Bumped plug w/2000 psi. Set 9-5/8" pkoff & tstd to 5000 psi. PU shifting
tools & strapped into upper FO. Opened & closed FO & tstd to 750 psi OK.
Ran into middle FO. Opened & closed FO OK. Open lower FO, circ OK.
Closed lower FO & tstd to 3000 psi OK. Opened lower FO & set RTTS. Tstd
above RTTS to 3000 psi OK. Circ & cond thru lower FO. Pumped 100 bbls of
wtr & prep to cmt 2nd stage. Cmtd 2nd stage thru FO @ 4400' w/425 sx
Arcticset w/0.7% D13R & .75% D65. Displ cmt w/67 bbls of mud w/RTTS.
Closed FO. Rev out. Tstd FO to 3000 psi OK. Pulled up to middle FO @
2466' & open same. Rev out. Circ down 5" DP & out 9-5/8" x 13-3/8" anul.
Closed FO & POH. RIH w/RTTS & FO shifting tools. Opened middle FO @
2466'. Set RTTS. Closed 9-5/8" x 13-3/8" anul. Broke down form w/lO00
psi. Pumped 200 bbls of wtr, 20 bbls of CW7 mix, followed by 300 sx 16
ppg Arcticset w/.2% D13R & 2% D59. Closed FO. Rev out. Tstd FO to 2500
psi OK. Pulled up & opened top FO @ 2336'. Rev out. Circ down 5" DP, out
9-5/8" x 13-3/8" anul. POH. TIH w/RTTS & FO shifting tools. Displ 9-5/8"
x 13-3/8" wi th 400 bbls water. Displaced water wi th 247 bbls Arctic Pack.
Last 90 bbls had less than 1% H 0 contamination Closed FO & press tstd to
3000 psi OK. Ran bit & csg scrgper. CO to FC ~ 6506'. Cond mud. CO pits
& displ hole to CaC12. POH & tstd to 2000 psi after passing each FO tool.
Ran CNL/GR/CCL log. Ran CBL w/800 psi csg press. PU pkr & tail pipe & set
@ 3350' on DP. Top o~-p'k~f-'@"32~'5-'~':~'' LDDP~ .... Chgd out rams to 7". Bonnet 0
ring leaked on blind ram tst. Chgd out 0 ring & tstd blinds to 5000. Tstd
7" rams to 3000. Ran 7" circ string w/52 jts 23# S00-95 butt & landed @
2319' Set pkoff & tstd to 5000. Tstd 9-5/8" csg to 3500. Installed 4½"
rams ~ tstd to 5000 psi OK. Started in hole w/Baker seal asbly. Dragging
in 7" csg. Pulled & redressed seal asbly. Cleaned rubber particles out of
stack. Reran Baker seal asbly. Reran & seated Baker seal asbly in pkr.
Press 100 psi OK. Press tstd control lines, 5000 psi OK. Landed tbg &
tstd tbg hgr pkoff 3000 psi. Install back press valve. ND BOP stack. NU
& press tstd McEvoy tree to 5000 psi. Press tstd tbg to 2500 psi w/200 psi
on csg. Holding press for 1 hr tst. RU & tstd lubricator. Ran dummy gun
& CCL log. Displ CaCI~ wtr w/fresh wtr & glyCol mixture. Commence 48 hr
press tst w/2500 psi o~ tbg & 2000 on csg. Released rig @ 2200 hrs 9-28-
76.
1~2-I~IB
STATE
of ALASKA
DEPARTMENT OF NATURAL RESOURCES
Division of Oil and Gas
to: [-- Hoyle H. flami
Acting Director
DATE : October 4, 1976
FROM:
Harold R. Hawkins
Petroleum Inspector..~,~
SUBJECT: BOP Test for Arco ~t. P No. 1-1
Sec. 31, TllN, R15E, J~.r~.
Permit No. 76-62
r._t_?b,r,]5, 1~6_- I went from DS-9-7 where I had witnessed a BOP test
Arco to Drill Site W. D No. I-1.~o witness another BOP test for Arco.
J had called Hoyle Hamilton for confirmation of this, Monday morning,
September 13, 1976~ from Dritl Si.re No. 9-7.
They started BOP tests on W.~D No. I-1. The manifold was tested First,
they have 7 Rucker Shaffer wheel type valves on manifold and 10 flanges
which were tested to 5000 psi, They also tested the manual choke to 5000 psi.
Then the Swaco superchoke was tested to 5000 psi. All the valves on the
manifold were tested to 5000 psi and held OK. Then they tested the annular
preventer to 5000 psi. They then tested the pipe rams and one inside choke
valve and check vatve was tested'to 5000 psi.. Then the inside kill valve
was tested to 5000 psi. The test stem was pulled and blind rams were tested
to 5000 psi. They also tested upper and lower kelly to 5000 psi, and also
tested the drill stem safety valves on floor to 5000 psi. These were dart
and bait valves, AIl the valves on the manifold and stack are Rucker Shaffer
valves except the superchoke. The two gates and annular preventer are also
Rucker Shaffer type. The ~ell sign was up with all data OK. The master
gauge on the accumulator was 2750 psi. The N2.backup bottles were all
1900 psi. They had actuated the master controls and panel controls on floor
which work fine. They have a stee] fuel tank. not bermed. Their mud pit
is a steeJ enclosed box so they use the pump truck when it needsccleaning.
The drilt site was in very good shape.
In sup.-~ar~y: I witnessed BOP test on Drill Site ¥~ P, ,~-~o. 1-1 and foLmd
equipment working properly and al1 tests good and rig in very good shape.
One copy of field report given to Hinos Hebert, one to be sent to Bob Hines°
Attachment
"sa~'isfa~°~:--;-' "T~e I.nspeC~ion:-' ::'::~.:-~:.-:'.'~.~"::-?:~'~-- satis:iac~°rY: '::'-'.? Type Inspection :
· 'Yes-:~,.-..~O ~i.-te'm (~)~ LOca'tion,General' .'~'.: '" Yes':': NO .item. ~) BO'PE. Tests ,'~
(~)- (.)'-~7~'We.lq-Sign ~.L'- . ~) (.~~ ~'Casing set ~49 ~ . '~ ~.:-,~
(X) '( ) :"~-~ 2. General Housekeeping · (~) '('"~'~1.6~ Test f'iuid-~)wt~ )mu~~oil ' .~. ~'
(X)' ( ) ]7: 3. Reserve Pit-(~open( )filled' (X)-(-) 17. Master'Hvd. Control Sys.~/JO~si~
(x) ()
~) '( )' 4"~- R.}.g) Safety Valve Tests (x) ( )
.. (.) ( ) 5. Surface-No. Wells
'-(--)~.:7'( )-.6../Subsurface-No. Wells
- .- -. ~- ('7) Well Test Data
. . ,
( ) '( )'- 7. Well Nos. , ,__,
( ) ( ) ..~.8. Hrs. obser ., -i, .
-() ( ) ~"9. BS&W ,__, ~-_~',__
( ) ( ) 10-. Gr. Bb~'~.
( ) Final Abandonment
(".)
(x) (.)'
()
()
()
()
( ) ( ) 11. P&A Marker (X) ( )
( ) ( ) 12. Water well-( )capped( )plugged (~) ( )
( ) ( ) 13. Clean-up (~) ( )
( ) ( ) 14. Pad' leveled (~<) ( )
Total inspection observation time ~ hrs/days Total number leaks and/or equip, failures~/~/~--
Remarks
18. N2 btlsiZz~ ,~d6~._~_c~aops'i§
19 Remote bonsrom§
20 Drilling spool-'~_~outlets
21 Kill Line-(A~) Check valve .
22. Choke Flowline.( )NCR valve
23. Choke Manifold No valvs.~Z_flgs/~-
24. Chokes- (9() Remote ~) Po~.~)Adj
25. Test Plug-(~)~.~ellhd( )c~g( )none
26. Annular Preventer~opsiQ
27. B1 ind Rams ~_psig
28. Pipe Rams ~o psig
29. Kelly & Kelly-cock~r~ao psig
30. Lower Kelly valve~~sig
31 Safety Floor valves-(~')BV (~)Dart
cc-?0~ /'f'/.~",~S'~5. Notify in
days or when ready
b·/~ ! ~ ~
Inspected ~A~/~/~'m ...
Date
'I' ""' ~'
Division of 0tl and Gas
3001 Porcupine Drive, Anchorage, Alaska 99501
July 22, 1976
Re: Prudhoe Bay No. 1-1 (24-31-11-15)
Atlantic Richfield Company'
State Permit No. 76-62
C. R. Knowles
'District Drilling Engineer
Atlantic Richfield Company
P. O. Box 360
Anchorage, Alaska 99510
Dear Sir:
Enclosed is the approved application for permit to drill the above referenced
well at a location in Section 31, Township llN, Range 1SE, UM.
Well samples and core chips are required. A mud log is not required. A
directional survey is not required.
Many rivers in Alaska and their drainage systems have been classified as
important for the spawning or migration of anadromous fish. Operations in
these areas are subject to AS 16.50.870 and the regulations promulgated
thereunder (Title 5, Alaska Administrative Code). Prior to commencing
operations you may be contacted by the Habitat Coordinator's office, Depart-
ment of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46, Chapter 03,
Article 7 and the regulations prolmulgated thereunder (Title 18, Alaska
Administrative Code, Chapter 70) and by the Federal Water Pollution Control
Act, as amended. Prior to commencing operations you may be contacted by
a representative of the Department of Environmental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department
of Labor is being notified of the issuance of this permit to drill.
To aid us in scheduling field work, we would appreciate your notifying this
office within 48 hours after the well is spudded. We would also like to be
notified so that a representative of the Division may be present to witness
testing of blowout preventer equipment before surface casing shoe is drilled.
C. R. ~I~ -2- July 22, 1976
In the event of s~penslon or abandonment please give this office adequate
advance notification so that we may. have a witness present.
Very truly yours,
Hoyle H. Hamilbn
Member
Alaska 0tl and Gas Conservation Comaittee
Encl~ure
cc:
Department of Fish and Game, Habitat Section w/o encl.
~partment of Environmental Conservation w/o encl.
DeParbnent of Labor, Supervisor, Labor Law Compliance
Division w/ encl.
AtlanticRichfieldCompany
North American~Producing Division
North Alaska ' rict
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
July 20, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Subject: Produced Water Disposal Well
#1-1 and #2-1
Dear Sir:
As per the Field Rules reqUirements, attached
are two schematic drawings showing the BOPE
with two 4" diverter lines to sump for the above
mentioned wells.
Very truly yours,
B. D. Richardson
Operations Aide
BDR: cs
Attachments
2.
3.
4:
6.
7.
8.
9.
10.
20-3/4" 2000 psi Shaffer Spherical.
20" x 20" 2000 psi Drilling Spool.
20" x 13-3/8" 2000 psi Weld on Head.
3" 2000 psi minimum Valve, full bore
(Ball valve preferred).
3" XH L.P. Nipple.
3" Bull Plug.
4" Diverter Line.s..
2-3/8" Riser fitted w/2" Ball Valve.
3" Hammer Union Half.
4" 2000 psi Flanged Gate Valve.
BOPE for
Drilling 17-1/2" Hole
Z/70
Prevailing Winds
100' minimum
2-4" diverter lines
,. ,
100 ' minimum
Diverter Line Schematic
for BOPE on 17-1/2" hole
CRK/BDR February 1976
AtlanticRlchfieldCompany
North Americen~oducing
North A~aske
Post Off]ce Box 360
Anchorage, A~ask~ 995!
Telephone 907 2~fT 5837
July 13, 1976
Mr. O. K. Gilbreth
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
RE- Produced Water Disposal Well #1-1
(24-31-11-15)
Dear Sir'
Enclosed is our Application for Permit to Drill together
with the $100 application fee for the above mentioned
well.
The required survey plat will be submitted as soon as
it is available from the survey company.
For your information, as well as the State Department
of Labor, this well is a straight hole with the surface
and bottom hole location both on ADL 28326. This lease
has an effective date of 10-1-65 and a termination date
of 3-27-84.
Very truly yours,
¢. R. Knowles
District Drilling Engineer
CRK/BDR/jr
Enclosures
rarrn I0-- 40t
P~ZV. i-1--71
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
PERMIT TO DRILL OR 'D££'PI:N
SUBMIT IN TRIPLIC/
(Other instructions on
reYerse side)
~&. TYpII OF WOrK
DRILL
b. TYP~ OY WI~LL
OIL
Atlantic Richfield Company
M I' I.TI Pl.11:
ZONE
3. ADDRI~,S O~ OPERATOR
· P. O. Box 360, Anchorage, AK 99510
4. LOCATION OF '~VELL
At surface
Approx IO00'N & 1500'E of~f~cr Sec 31 , T] IN-R15E, UM
A: p?o~d ~ro~. ~.o.e ~0 ~_
Same as Surface
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
ApproXimately 4½ miles north of Deadhorse
14. BOND INFOF~MATION:
API# 50-029-20226
LEASE DEISIGNA'rlON AND S~RIAL NO.
ADL 28326
IF INDIAN, AJ,-~'-~O-l-l~l~:I!; OR T~BE NA.I~/~
8. UNIT FARM O1/ LEASE NA-ME
Prudhoe Bay
,. WELL NOprOduced Water 'Di s-
)osal Well # 1-1 (24-31-11-15)
lO. I~IELD AND POOL. OR WILDCAT
Prudhoe Bay
il. SEC.. T., R.. M., CBOTTOM
HOLE OBJECTIVE~
Sec 31, TllN, R15E
12.
TYPE Statewidesu~e,~d,or~o. Federal Insurance Co #8011-38-40
1.5 DISTANCE FROM PROPOSED" /i6. iN'O. OF ACRE~ IN LEASE
LOCATION TO NEAREST
1
PROPERTY OR LEASE LINE, ~, ] 0001 See remarks
(AI~ to nearest drig. unit. if any)
, . ,,
18. DISTANCE PROM PROPOSED LOCA~O~* ] lV. PHO~S~ D~
TO ~sr wE~u D~n~a, CO.PLUm
I
OR APPLIEDFOR.~. In excess or 10,000' to '
nearest salt ~ater disposal ~el] 6600~ .straight hole~
21. ELEVATIONS lShow whether D~, RT, G~, ete.~
52' RKB, Pad. Elevatiop 30'
23. PROPOSED CASINO AND CEMENTING PROGRAaM
~o~ $1.00 ~ 000.00.
17.NO. ACRES ASSIGNED
TO THiS WELL
See remarks
20. ROTARY OR CABLE TOOLS
. Rotary.
22. APPROX. DATE WORK WII,L START*
8-1-76
SIZE OF HOLE SIZE OF CASING.I WEIGHT PER FO°T GRAI)E SETTING DEPTH quantity of cement
_'~2" '20" 94# . H-'40 [80' b'el Dad Circ tn surface, aoornx 500 _~×
17½" 13-'3/8''' 72# . ..MN-80 270F)" C. irr to.. ~rfacp; approx 5.500
12~'" 9-5/8" 47~ _qnn-q~ 6600' 3000+ c.m_t co!u_m.n on-!st stage
& MN-80 [aoDr~x 1500. sx on 2nd stage.
_ 7.1' .... 2~# . M'N-80 sur,f to 2400 (il.~Eol circ. s. tri. nq ...
4½' 12.75# N-80 4000' Injection string
SEE ATTACHMENT
IN ABOVE SPACE DESCRIBE FROPOSED PROGRAJ~I: If proposal is to deepen give data on present productive zone and proposed
new pro-ducttve zone..lf_l~.r_o~9_s~.l ~s to cir~ll or (leepen dlrect.[onalty, give pertinent data' on s%ibsurface l~t~0ns and rnea.suxed and true
vertical depthS. Give bloveout pre~n, ter' prog!-ara.
certtf.~ha he F r'egoDIg' IS e an~ Correct
. _ ~ [ Trr~
(This space for State office use)
CONDITIONS OF APPROVAL, IF AN-Y:
SA.MPL~S AND CORE CHIPS
~[] Y~S l~ NO
DIR~C'TION AL SURVEY
D ~ OI-w°
MUD LOG
YES ~-t NO
A.P.I. NUMIiRICAL CODZ
50-029-20226
.~,~o .... 76-62 ~: ~--- , ........... ~a~OVALDAZ~ .July 27... 1.976 .
AP~ov~,~ ,~.'~~~Z/~.~ ~rnm. Member .... ~,~___July 22, 1976
ATTACHMENT
APPLICATION FOR PERMIT TO DRILL OR DEEPEN
Produced Water Disposal Well # 1-1
The Atlantic Richfield Company proposed to drill this disposal well to
6600'MD (straight hole)to provide shallow zones from 4100' to 6000'
for produced water disposal. A 20-3/4" spherical BOP will be used on
the 20" conductor. A 13-5/8" 5000 psi spherical and 5000 psi blind
and pipe rams (RSRRA) will be used on the 13-3/8" casing. The BOPE
will be pressure tested weekly and operationally tested each. trip.
Logs will be run over selected intervals and a maximum of 120' of
cores will be drilled from zones of interest. A 7" circulating string
with ethylene glycol will be run from 2400' to the surface. A com-
pletion string comprised of a Baker Oil Tool Packer and Locator tubing
seal assembly and Otis 4½" RQB landing nipple with RQ lock and PX prong
will be run on 4½" Hydril CSCB tubing. A non-freezing fluid will be
left in all annuli within the permafrost interval. A 4" 5000 psi tree
will be installed and the completed well left unperforated. This well
will serve for disposal of all produced water at Flow Station #1.
CHECK LIST FOR NEW WELL PERP, ITS
I-s the permit fee attached .....
Company ,,~/~ ...~. ,~
Yes Ho Remarks
_~. Is well to be located in'a defined pool ....
3. Is a registered survey plat attached ...........
~. Is well located proper distance from property line . .
B. Is well located proper distance from other wells .....
Is'sufficient undedicated acreage available in this pool ...... ~z~a.~ .__
7. Is well to be deviated .......
Is operator the only affected party . .
Can permit be approved before ten-day wait
Does operator have a bond in force ...........
l_ Is a conservation order needed ........... . ......
2. Is administrative approval needed
3. Is conductor string provided ..........
Is enough cement used to circulate on conductor and surface .
·
5. Will cement tie in surface and intermediate or production strings
6. Will cement cover all known productive horizons . .
7. Will surface casing protect fresh water zones . .
B. Will all casina mire ad~ % , '.
_ ~xuate safe~v in collapse tension & burst
9. Does BO?E have sufficient pressure rating /i-es/-. . .~/'~'. . , d~. -<-~o~]~. . . . .
- ..'~ P. Dpr6val Recommenced:
Ge61oqv Enaineerina'
TP,,~ mmq H!iK A/~)~ OKG HHH ~"
JAL 'LCS JCM
Revised 1/15/75