Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout173-041 •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 18, 2012
sWAND AUG 1 7 2.01'
Mr. Jim Regg �1
,72.1 0 Alaska Oil and Gas Conservation Commission
333 West 7 Avenue , 0
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB A -Pad
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad
A that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
L- 4 F )
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
A -Pad
Date: 04/15/2012
Corrosion
Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD 4 API 4 Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft na gal
A -01A 2012420 50029201080100 1.3 NA 1.3 NA 11.10 7/21/2009
A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009
A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009
A -04 1720060 50029201150000 0.0 NA NA NA NA NA
A -05A 2061280 50029201160100 0.0 NA NA NA NA NA
A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009
sj' A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009
A -08 1740040 50029201320000 No conductor NA NA NA NA NA
A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009
A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009
A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009
A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009
A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012
A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009
A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009
A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009
A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009
A -18 1921070 50029206300100 SC leak NA NA NA NA NA
A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009
A -20 1820130 50029207090000 0.8 NA 0.8 NA _ 5.10 7/20/2009
A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009
A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA
A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009
A -24 1820700 50029207430000 29.0 5.8 0.1 11/27/2009 1.70 3/18/2010
A -25A 2011480 50029207640100 0.3 NA 0.3 NA 1.70 8/13/2009
A -26L1 1971060 50029207946000 0.3 NA 0.3 _ NA 1.70 7/21/2009
A -27A 1982350 50029208090100 7.5 NA 7.5 NA 71.40 7/20/2009
A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009
A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009
A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009
A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009
A -32A 1990580 50029213950100 2.0 NA _ 2.0 NA 17.00 4/11/2012
A -33 1851830 50029214100000 0.8 NA 0.8 NA 3.40 8/12/2009
A -34A 1851050 50029213390100 4.4 NA 4.4 _ NA 28.90 7/22/2009
A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009
A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat
A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012
A -39 1930280 50029223440000 0.5 NA 0.5 NA 3.40 7/21/2009
A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009
A -41 1941580 50029225300000 SC leak NA NA NA NA NA
A -42A 2061300 50029225420100 0.6 NA 0.6 NA 5.10 7/20/2009
A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009
A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009
OPERABLE: A-07 (PTD #1730~) Tubing Integrity Restored Page 1 of 2
~
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~-~~~G ~r' ~~~~~, ~
Sent: Monday, September 28, 2009 6:52 PM ~ l
To: GPB, Area Mgr Central (GC1/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R
Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Welis Opt Eng; GPB,
Optimization Engr; GPB, Prod Controllers; Hibbert, Nancy; GPB, Well Pad AB; Regg, James B
(DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA)
Cc: NSU, ADW Well Integrity Engineer; Quy, Tiffany; Holt, Ryan P(ASRC)
Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored
All,
~
Weii A-07 (PTD #1730410) passed a TIFL after changing out the orifice gas lift valve proving tubing integrity has
been restored. The well has been reclassified as Operable.
Please let us know if there are any questions.
Thank you,
Anna ~Du6e, ~.~. ~alt Torin Roschinger)
Well Integrity Caordinatar
GPB Wells Group
Phone: (907j 659-5102
pager: (9Q7) 659-5100 x1154
~w~~~~% 1~`.";' ~ ~; ~C~~~:
~~
From: NSU, ADW Well Integrity Engineer
Sent: Monday, September 21, 2009 9:50 AM /
To: GPB, Area Mgr Central (GCl/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations
Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Hibbert, Nancy; GPB, Well Pad AB; 'James Regg'; 'Maunder, Thomas
E (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>'
Cc: NSU, ADW Well Integrity Engineer
Subject: UNDER EVALUATION: A-07 (PTD #1730410) Failed TIFL
All,
Well A-07 (PTD #1730410) has sustained casin ressure due to TxIA communication with a failin TIFL. On
09/16/09, the wellhead pressures were tu ing IA/OA equal to SSV/2170/120 and gas lift pressure 2170 psi. The
IA pressure appeared to be equalized with the gas lift pressure verifying the pressure was induced an not from
downhole. However on 09/21/09, a TIFL failed verifyinq TxIA communication. The well has been reclassified as
Under Evaluation. ~
The plan forward is as follows:
1. D: TIFL - FAILEQ
2. S: C/O OGLV
3. D: Re-TIFL
Please call with any questions or concerns.
Thank you,
11/5/2009
OPERABLE: A-07 (PTD #1730~) Tubing Integrity Restored • Page 2 of 2
Torin Roschinger (alt. Anna Dube)
Well Integrity Coordinator
Office (907) 659-5102
Cell (406) 570-9630
Pager (907) 659-5100 Ext. 1154
11/5/2009
12/08/08
~chlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
arrN: sett!
WPII .Inh k
NO.4995
rY,,r,,~~'p r, t~~` 4, ~ , ~~~ Company: State of Alaska
Rz~''ra`£Gt~~~ ; ,9 Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Inn ilucrrinfie.n nee GI n-.~... nn
R-03A 4994 INJECTION PROFILE (REVISED) 10/08/08 1 1
13-23A 4994 INJECTION PROFILE 10/21/08 1 1
Ot-26A 4994 SCMT 11/13/08 1 1
D-29 4994 USIT 10/19/08 1 1
15-026 4994 MEM PROD PROFILE - 11/25/08 1 1
H-05A 4994 MEM PROD & INJ PROFILE 11/20/08 1 1
E-32A 4994 SCMT ( 11/04/08 1 1
12-17 4994 PRODUCTION LOG - O (~/ 11/04!08 1 1
P2-41 4994 PRODUCTION LOG - 11/07/08 1 1
1••29/M-25 4994 PRODUCTION LOG 11/04/08 1 1
MPC-05A 4994 MEM LDL
~ 11/15/08 1 1
L-114A 4994 USIT ~ r. ((
S 11/03/08 1 1
A-07 4994 PRODUCTION PROFILE ~ - ~} 11/27!08 1 1
07-18 4994 INJECTION PROFILE ~- - 12/02/08 1 1
15-12B 4994 MEM PROD PROFILE (,p -- ~ ~, 11/27/08 1 1
4-40/P-43 4994 MEM LDL i9 - ' '~' . C:y 11/26/08 1 1
N-14B 4994 MCNL-(~'j~(~ ( ' 09/20/08 1 1
01-21A 4994 MCNL 09/29/08 ~ 1
E-29A 4994 MCNL 09/01/08 1 1
PI FARP ACI(AIf1W1 Cn!_C oe rrrnT ov c~~n_~ uw~n w
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
~ ~~ i+
Date Delivered:
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503 8 8
ATTN: Beth
Received by:
•
•
~`
OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored • Page 1 of 2
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com]
Sent: Wednesday, August 13, 2008 6:41 PM
To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, Area Mgr Central (GC1/3/FS3);
GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU,
ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; Kimmet,
Megan; GPB, Gas Lift Engr
Cc: Winslow, Jack L.; NSU, ADW Well lntegrity Engineer
Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored
Follow Up Flag: Follow up
Flag Status: Blue
All,
:/
Well A-07 (PTD #1730410) passed a TIFL on 08/13/08 confirming tubing integrity. The well has been reclassified
as Operable.
Please call with any questions or concerns.
Thank you,
Andrea Hughes
~~~~NE~ SEP ~ 2008
From: NSU, ADW Well Integrity Engineer
Sent: Sunday, August 10, 2008 2:02 PM
To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, Area Mgr Central (GCi/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R
Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; Kimmet, Megan; GPB, Gas Lift Engr
Cc: NSU, ADW Well Integrity Engineer; Townsend, S. Eliot
Subject: UNDER EVALUATION: A-07 (PTD #1730410) Sustained IA Pressure due to TxIA Comm
AI I,
Well A-07 (PTD #1730410) has been found to have sustained casing pressure on the IA. The TIOs were
2100/2050/130 psi on 08/06/08 when the well initially passed a TIFL. During the following 3 day monitor, the IAP
slowly climbed 130 psi and the fluid level in flowed 370 feet. The we-I has been reclassified as Under Evaluation
and may be produced under a 28-day clock. Alternatively, Operations may allow the IA pressure to continue to
build.
The plan forward for the well is as follows:
1. DHD: TIFL -FAILED
2. S: DGLVs
3. F: MITIA to 3000 psi
A TIO Plot and wellbore schematic have been included for reference.
Please call with any questions.
9/5/2008
OPERABLE:. A-07 (PTD #1730410) Tubing Integrity Restored • Page 2 of 2
Thank you,
Andrea Hughes
Well Integrity Coordinator
Office: (907) 659-5102
Pager: (907} 659-5100 x1154
9/5/2008
PBU A-07
PTD 173-041 J _~~_~
TREE = 4-1116" CM/
WELLHEAD = McEVOY
ACTUATOR- BAKER
KB. ELEV..- ~~ 64.69"
BF ELEV - 45.49'
KOP = 3266'
Max Angle = 58 C~?? 9 i i 6'
Datum MD = 11669'
Datum TVD = 8800' SS
•
E 10-3I4'° TBG, 55.5#, N-80, .0925 bpf, ID = 9.760" E--j 154'
13-318" CSG, 72#, N-80, ID = 12.347" (--~ 269$`
Minimum ID = 3.725" @ 9985`
BP SET iN C?TIS XN NIPPLE
4-112'° TBG; 12.6#, 13-CR, .0152 bpf: ID = 3.958" (-~ 9997'
TOP OF 7" LNR ~ 1002$'
7" LNR, 17#, L-80, .0387 bpf, ID = 6.538" 10028'
9-5i8" CSG, 40#, L-80, .0758 bpf, ED = 8.835" 10562'
PERFORATION SUMMARY
REF LOG: SWS BHCS ON 02;12/74
ANGLE AT TOP PERF: 35 @ 11510'
Note: Refer to Production DB for historical perf data
SIZE SPF tNTERVAL OpnJSgz DATE
3-3/8" 4 11510 - 11544 O 08!16!92
3-318" 12 11641 - 11681 O 08109192
2-7/8" 4 11684 - 11699 S 01110!92
2-7i8" 4 11709 - 11756 S 01!10!92
2-7/8" 4 11766 - 11796 S 01/10192
2-7/8" 4 11810 - 11835 C 05;'19;79
S Y NOTES: "~'*4-1f2" CHROMETBG`*`
- TRANSMITTER IN WEATHER MONITORING SHACK
MUST BE TURNED OFF BEFORE ANY WELL WORK
INVOLVING IXPLOSIVES CAN BEGIN! CONTACT PAD
OPERATOR:
140' i--~BTM 11-314" X 9-5d8" THERMOCASE
154' 10-3(4" X 9 5r'8" XO
1566' 13-318" XO, 62#;72#
2029' --I 4-112" HES X NIP, ID = 3.813"
2107' 9-5J8" 12' BOT PBR
2122' 9-5(8" HANG
2133` 9-5J8" FOC
2658' 9-5J8" FOC
- 4214' 9-5t8" FOC
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3068 3066 7 KBG-2 DMY BK 0
4 4010 3957 30 KBG-2 DOME BK 16 10/28/06
3 7348 6061 55 KBG-2 DOME BK 16 10/28!06
2 8578 6811 54 KBG-2 DMY BK 0 05J28tfl4
1 9825 7506 54 KBG-2 SO BK 20 10/28106
9$91' 4-112" HES X NIP, ID = 3.813"
9902' -) BAKER S-3 PKR, ID = 3.969"
9925' 4-1J2" HE5 X NIP, ID = 3.813"
99$5' 4-1J2" HES XN NIP, ID = 3.725"
9997' WLEG
y ELMD TT NOT LOGGED
11578'
11700'
???
11700'
11700'
11796`
11802'
11806'
11808'
PBT® 11864` -
7" LNR, 29#, L-80, A371 bpf, ID = 6.184" 11$94'
D REV BY COMMENTS
09/19177 ORIGINAL COMPLETION 06/05104 BJMcLJK FCO
01124/01 LAST WORKOVER 08124106 KSB/PAG GLV CIO
04(05(03 KAK CLEAN UP 10!28106 CJhUPRG GLV C!O
03!24104 LWBJTLP ST t TVD CORRECTIONS 10(29/07 JLJJTLH qDD Tftr1N5F~4ITTER VYAF2NING INFO
05.'05,04 KSlKAK FISH _
05128104 DAVJKAK GLV CIO
MARKERJOINT
TOP OF FELL {06!05144}
FISH- OK-6 KICKOVER SPRING {0510504}
FISH -BAKER PKR ELEMENT - 05(27(90
FISH - KINLEY CUTTER - 01/20101
7" X 4-1(2" OTIS WD PKR~
4-112" OTES X NIP, ID= 3.813"
4-112" OTIS BP SET 1N OTIS XN NIP, ID = 3.725"
4-112" W/LEG, !D = 3.88"
PRUDHOE BAY UNIT
WELL: A-07
PERM(1" No: 1730410
API No: 50-029-20131-00
SEC 35, T11 N, R13E, 1696' FNL & 922' FEL
BP Exploratlan {Alaska}
OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Page 1 of 2
•
Regg, James B (DOA)
From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com]
Sent: Thursday, July 17, 2008 7:21 PM
To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, GC3 Wellpad Lead; GPB, GC3
OTL; GPB, Area Mgr Central (GC1/3/FS3); NSU, ADW Well Operations Supervisor;
Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB,
Optimization Engr
Cc: Kimmet, Megan; GPB, Gas Lift Engr; Winslow, Jack L.; NSU, ADW Well Integrity Engineer
Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored
Follow Up Flag: Follow up
Flag Status: Blue
Ail,
Well A-07 {PTD #1730410) passed a TIFL past-gas lift valve Chan e out on 07/17/08. The passing test verifies
that tubing integrity has been restored. The well as been reclassified as Operable and may be on production
when convenient.
Please cal! with any questions or concerns.
Thank you,
Andrea Hughes
Well Integrity Coordinator
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
From: NSU, ADW Well Integrity Engineer
Sent: Friday, July 11, 2008 8:30 AM
To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, GC3 Wellpad Lead; GPB, GC3 OTL; GPB, Area Mgr Central (GCl/3/FS3); NSU, ADW
Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr
Cc: Holt, Ryan P (ASRC); Kimmet, Megan; GPB, Gas Lift Engr; Winslow, Jack L.; NSU, ADW Well Integrity Engineer
Subject: UNDER EVALUATION: A-07 (PTD #1730410) for Sustained casing pressure due to TxIA Comm
Hi all,
Well A-07 (PTD #1730410) has been found to have sustained casing pressure on the IA. The wellhead pressures
were tubing/IA/OA equal to SSV/2100/100 psi on 07/06/08. Due to the constraint of not being able to bleed
pressure down to the production system due to the shut-down, the diagnostic work took longer to complete. On
07/10/08, a TIFL was conducted and failed due to build up of pressure overnight confirming TxIA communication.
The well has been reclassified as Under Evaluation and placed on a 28-day clock. Opera Ions may allow e IA
pressure to continue to build pressure.
The plan forward for the well is as follows:
1. DHD: TIFL -FAILED
2. Slickline: Change out orifice gas lift valves
3. DHD: re-TIFL
9/5/2008
OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Page 2 of 2
• •
A TIO plot and wellbore schematic have been included for reference.
Please call with any questions.
Thank you,
Anna ~u6e, ~'. E.
Welt lntegr; ty Caordinator
GPB We11s Group
Phone: {907) 659-5102
Pager: {90T) 659-5100 x1154
9/5/2008
a~
v
• ~
~ y~ O O O
T
__
0
a
0
T
0
{~
d
0
Q
a
0
1 r
ors
0
a
co
v
a
0
a
a
a
a
M
a
st
d
4
0
0
0
N
0
0
0
T
a
0
o~
v
TREE = 4-1116" CNV
WELLHEAD= McEVOY'.
.u~
ACTUATOR - --._~„~..
BAKER
KB. ELEV..- 64.69"~
BF E1EV = ~45.49~
,..~
KOP - ~~ ., ~.
3266'
.Max Anale = 58` ~ 9116')
Datum MD = 11668'
Datum N D = .
8$00' SS)
•
10-3l4" TBG, 55.5#, N-80, .0925 bpf, ID = 9.760" I"I 154'
13-318" CSG, 72#, N-80, ID = 12.347"
Minimum ID = 3.725" @ 9985'
BP SET IN OTIS KN NIPPLE
0 4-112" TBG; 12.6#; 13-C R, .0152 bpf; ID = 3.958" (-[ 8897'
TOP OF 7" LNR I 10028'
7" LNR, 17#, L-80, .0387 bpf, ID = 6.538" 10028'
9-5f8" CSG, 40#, L-80, .0758 bpf, ID = 8.835" 10562'
PERFORATION SUMMARY
REF LOG: SWS BHCS ON 02/12/74
ANGLE AT TOP PERF: 32° @ 11510'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-318" 4 11510 - 11544 O 0$(16192
3-318" 12 11641 - 11681 O 08109192
2-718" 4 11684 - 11699 S 01110192
2-7l8" 4 11709 - 11756 S 01110/92
2-7(8" 4 11766 - 11796 S 01/10(92
2-718" 4 11810 - 11835 C 05119(79
PBTD 11864°
7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11894'
11578° --~ MARKER JOINT
11700' --~ TOP OF FILL {06/05/04}
??? FISH - OK-6 KICKOV ER SPRING {0510504}
11700' FISH -BAKER PKR ELEMENT - 05(27/90
11700' FISH - KINLEY CUTTER - 01/20/01
11796° 7" X 4-112" OTIS WD PKR
11802` 4-112" OTIS X NIP, ID = 3.$13"
11806' 4-112" OTIS BP SET IN OTIS XN NIP; lD = 3.725"
11808' 4-112" WILEG, ID = 3.88"
49/19/77 ORIGINAL COMPLETION 06/05/04 BJMcLlK FCO
01124101 LAST WORKOVER 08/24106 KSBfPAG GLV C!O
04/05/03 KAK CLEAN UP 10r`28i06 CJNr'PAG GLV Ci0
03124/04 LWBITLP ST { TV D CORRECTIONS 10129!07 JLJITLH ADD TRANSMITTER wARN6NC €NFo
05(05104 KSIKAK FISH 07118/O8~ DAVlJMD GLV Ci0 {07/12108}
05f28f04 DAVlKA GLV Cf0
PRUDHOE BAY UNIT
WELL: A-07
PERMfI" No: 1730410
API No: 50-029-20131-Ofl
SEG 35; T11 N, R13E, 1696` FNL & 922' FEL
BP Exploration (Alaska)
R
U SHACK
I
~
NY
a
SI7`-B
I{
i!
INVOLV E TURNED OF
F
BEFORE A
WEL! WORK
ING IXPLOSIVES CAN BEGINI CONTACT PAD
OPERA
140' TOR:
BTM 11-314" X 9-518" THERMOCASE
154' 10-314" X 9 518" XO
1566' 13-318" XO, 62#l72#
2029' 4-1l2" HES X NIP, ID = 3.813"
2107' 9-518" 12' BOT PBR
2122' 9-5(8" HANGER
2133' 9-5/8" FOC
265$' 9-5t8" FOC
4214' 9-518" FOC
GAS LIFT MANDREIS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
5 3068 3066 7 KBG-2 DMY BK 0
4 4010 3957 29 KBG-2 DOME BK 16 10/28/06
3 7348 6061 55 KBG-2 DOME BK 16 10128/06
2
1 8578
9825 6811
7506 54
54 KBG-2
KBG-2 DMY
SO BK
BK 0
20 05!2$/04
07(12(08
9$91' 4-1l2" HES X NIP, ID = 3.813"
8902' BAKER S-3 PKR, ID = 3.969"
9925' 4-112" HES X NIP, ID = 3.813"
9985' 4-1l2" HES XN NIP, ID = 3.725"
9997° WLEG
ELMD TT NOT LOGGED
Schlumberger
RECEiVED
06/05-06/06
JUN 0 8 2005
NO. 3835
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
·:~j~S¡{;;
& ;3as CGOS. Gcmffil$SlCn
411ct1craqe
cf"'NN~[:
~~..-?'J {Ii "" ...4:;""'0
<' @ cmn¡:\
,/:.} '- -,,' ~
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501 ., () Lf I
Field: Prudhoe Bay t1 '3
WI!
J b#
L D . I
D t
BL
CI
CD
e 0 og escnpt on ae o or
17-13A Rt___C) - (),~t 11001218 US IT 04/04/05 1
NK-65A AtJ:.::; -{)r:~~ 11084270 SCMT 07/05/05 1
02~10B ::Jtx.5- (j ("., '-I 10964140 LDL 04/06/05 1
01-11 i'~'1 -{~<+ 11051039 INJ ECTION PROFILE (i " => ,/ - r ar' ., [) ,~,) C, h1-5. h<.. 04/29/05 1
01-09A Ie¡.:. - t):~~ 10559825 INJECTION PROFILE . I 07/31/03 1
01-11 ~ .~+ -("'-..,~ 1- 10662950 INJECTI~~ PROFILE Clop 'I - (" "c..e\V~ :;) /éì3i0:"'1 09/16/03 1
11·34 I C>¡4(- ¡-~X 10687720 LDL 12/31/04 1
A-07 1'?~-O~1 9153241 PRODUCTION'PROFILE (! ~ Cd - r,¿C'.. 'I';'Ti¡{~(/,... 02104/03 1
B-36 I C, I,,, - è0;C) 10563182 LDL (I ,,::'I,i - rot', ~..: ó, ì ÎI;::J"'::lIt\-::t.' 07/09/03 1
01:20 i~::).- 14'-- 10687694 PRODUCTION PROFILE 07/16/04 1
K-01 /"'lr.3 - /.:::J./ 11211415 SCMT 06/01/06 1
H-3'O l ~7r - (' ;~~:.., 11217253 US IT 06/01/06 1
D.S:09-06 ¡,,+(~ - f-t.J4' 11258699 US IT 04/13/06 1
e
e
Petrotechnical Data Center LR2-1
900 E, Benson Blvd. .-
Anchorage, Alaska 99508 "".jjf\ "
1\ j'
C i ;"--
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503·2838
ATTN: Beth '
04/02/03
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
NO. 2728
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay, Endicott, Milne Pt.
Color
Well Job # Log Description Date Blueline Prints CD
A-07 J '7,~.~:)(-// PRODUCTION PROFILE 02/04/03
NK-22A ~,~<~ I-,-.~-'-~ ~ PROD PROFILE/DEFT 02/26/03
PWDW2-1 7'~7 (~- ~..~ (~ ~,~. LDL 03/01/03
"WDW2-1 /~;'%l/' -7'"'~/C'} TEMPERATURE LOG 02/15/03
R-06A LDL 02/28/03
, ,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508 kF£CEI ?ED
Date Delivered:
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
AI-I'N: Beth
STATE OF ALASKA '
ALAsKA'O1L AND GAS CONSERVATION coMM'iJ~SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] PlUgging [] Perforate
~a Pull Tubing r-I Alter Casing ~ Repair Well [] Other
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Inc. [] Development KBE = 64.69'
[] Exploratory 7. Unit or Property Name
3. Address [] Stratigraphic Prudhoe Bay Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
r.3 [~ ~\/.~ ["~~. A-07
1696' SNL, 922' WEL, SEC. 35, T11N, R13E, UM
~'~[~'¢~.~ V ~.~' 9. Permit Number / Approval NO.
At top of productive interval 173-041
26o5' NSL, 5O78' WEL, SEC. 26, T11N, R13E, UM
At effective depthFEB1 ~ ~_{}01 10. APINumber
~"~ 50- 029-20131-00
2714' NSL, 5072' WEL, SEC. 26, T11N, R13E, UM 11. Field and Pool
At total depth Alaska Oil & Gas Cons. Commission Prudhoe Bay Field / Prudhoe Bay
2730' NSL, 5070' WEL, SEC. 26, T11N, R13E, UM Anchorage Pool
12. Present well condition summary
Total depth: measured 11899 feet Plugs (measured)
true vertical 9068 feet
Effective depth: measured 11864 feet Junk (measured)
true vertical 9037 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 100' 20" 100' 100'
Surface 2698' 13-3/8" 3250 sx 2698' 2698'
Intermediate 10562' 113,4'' x 10¥4" x 95/8" 2275 sx 10562' 7985'
Production
Liner 1866' 7" 850 sx 10028' - 11894' 7629' - 9064'
Liner Tieback 10004' 7" 375 sx Class 'G' 24' - 10028' 24' - 7629'
Perforation depth: measured Open: 11522' - 11544', 11641'- 11681' Open Below'WD' packer: 11810' - 11835'
Sqzd: 11684' - 11796' (three intervals)
true vertical Open: 8740' - 8758', 8842' - 8876' Open Below 'WD' packer: 8989' - 9012'
Sqzd: 8879' - 8977'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr80 to 9997'
Packers and SSSV (type and measured depth) Otis 7" 'WD' packer at 11796'; Baker 'S-3' packer at 9902'; Otis SSSV LN at 2029'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Averaqe Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service
[] Daily Report of Well Operations ·
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble "~~.., ~ Title Technical Assistant ,, Date {~)'~-I '~'OJ
Prepared By Name/Number: Terrie Hubble, 564-4628
Form 10-404 Rev. 06/15/88
Submit In Duplicat!A
RECEIVED
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER 8tart: 8/29/2000 End:
Contractor Name: NABOR8 Rig Release: Group: RIG
Rig Name: NABOR8 4E8 Rig Number: 4E8
::. Si;ib:.~' .............. . .................. ,.. ..... , .......................... :.......... .,..,,,
Date From To Hours Task' a[':':~: :':Ph'ase· :i ~i~([~~{i~ :i ii ii
I - -:"::' ' '¢' ¢~e! ::::._::E;::.;.:;:~i:!!:!.!::'
8/31/2000 00:00 - 01:30 1.50 MOB DECOMP MOVE ON, RIG UP.
01:30 - 04:30 3.00 MOB DECOMP ACCEPT RIG @ 0130 HRS 8-31-00. BERM UP & SET TIGER TANK.
PJU HARD LINES & FILL RIG OITS W/SEAWATER.
04:30 - 06:00 1.50 WHSUR DECOMP P-JU LUBRICATOR. PULL BPV. TEST LINES TO 2500 PSI.
06:00 - 09:00 3.00 KILL DECOMP SlTP 0 PSI, SlCP 0 PSI. OPEN WELL & CIRCULATE OUT FREEZE
PROTECTION.
09:00 - 13:30 4.50 KILL DECOMP FILLED HOLE, HOLE HOLE WOULD NOT STAY FULL.MONITOR
LOSSES. MIX & PUMP 42 BBL LCM PILL. LOSSES DECREASED TO
1 BPH. LOST 144 BBLS IN 3 1/2 HRS.
13:30 - 14:00 0.50 WHSUR DECOMP ISTALL & TEST TWC TO 3500 PSI.
14:00 - 16:00 2.00 WHSUR DECOMP NIPPLE DOWN X-MAS TREE.
16:00 - 20:30 4.50i BOPSUF DECOMP INSTALL SPACER SPOOL ( WELL SUBSIDED, TO LOW F/BELL
NIPPLE) NIPPLE UP BOPE.
20:30 - 00:00 3.50 BOPSUF DECOMP PRESSURE TEST BOPE, LP 250 PSI, HP 3500 PSI. TESTED, OK.
9/1/2000 00:00 - 01:00 1.00 WHSUR DECOMP P/U LUBRICATOR, PULL TWC. & L/D SAME.
01:00 - 01:30 0.50 PULL DECOMP PJU CAMCO SPOOLING UNIT.
01:30 - 03:30 2.00 PULL DECOMP M/U LANDING JT. BACK OUT LOCK DOWN BOLTS. PULL HANGER.
(150K) L/D SAME. UP WT 105/130K, DOWN WT 70K.
03:30 - 10:00 6.50 PULL DECOMP POOH & L/D 4 1/2" TBG. TBG STRING DRAGGING.
10:00 - 12:00 2.00 PULL DECOMP POOH & L/D TBG.PULL TO 175K TBG/CONTROL LINE STUCK.
SPOT EP MUD LUBE & WORK PIPE.
12:00 - 19:30 7.50 FISH DECOMP P/U 2 - 6 1/4" DC, BUMPER SUB & X-OVER. SCREW IN TBG
COLLAR & WORK TBG FREE DOWNWARD. WORK TBG. PULLING
TIGHT GOING UPWARD. WORK TBG. RECOVERED & L/D JT# 51.
WORKED OUT 35 FT OF JT# 52 & TBG PULLING TIGHT W/NO
PROGRESS. (
19:30 - 21:00 1.50 FISH DECOMP L/D 6 1/4" DCS & BUMPER SUB. STRAP RECOVERED TBG. LOAD
31/2" DP & 4 3/4" DCS.
21:00 - 00:00 3.00 FISH DECOMP P/U SAFETY JT, SCREW INTO TBG. P/U JARS & 4 3/4" DCS.
BEGIN WORKING PIPE BACK TO BOTTOM
9/2/2000 00:00 - 02:00 2.00 FISH DECOMP TRIP IN HOLE W/TBG. BACK OFF (UNSCREW) LEAVE TBG ON
BOTTOM.
02:00- 03:30 1.50 FISH DECOMP POOH.
03:30 - 04:00 0.50 FISH DECOMP L/D CONTOL LINE. ( BALLED UP AROUND JARS)
04:00 - 06:00 2.00 FISH DECOMP MAKE UP SPEAR FISHING ASSY with 8.375" stop ring ATTEMPT TO
WORK DOWN THRU STACK.
06:00 - 11:30 5.50 FISH DECOMP Make up spear with 8.250" stop ring. TIH to 37' .Worked pipe and
unable to go any deeper. POOH with spear. Laid down spear and stop
ring. Made up 3 1/2" Mule shoe and RIH to 250'. POH with mule shoe.
Picked up spear maximum OD 5.90" and RIH to top of wellhead
unable to get down. Picked up 3 1/2" mule shoe and RIH with same to
2,055'. POH with BHA and mule shoe.
11:30 - 13:30 2.00 FISH DECOMP Cleared rig floor, cleaned floor and serviced rig.
13:30 - 16:00 2.50 FISH DECOMP Rigged up Schlumberger wireline, RIH with PFCS to 70'. Unable to get
down. POH with PFCS. Rigged down Schlumberger.
16:00 - 00:00 8.00 FISH DECOMP Made back to back runs with rope spear on fishing BHA
Run Number Spear# Depth Recovery
#1 I 71' Wad of line & 1 band
#2 1 119' Wad of line & 4 bands
Printed: 11/1/2000 10:17:53 AM
'---- RECEIVED
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8/29/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
. Code:., ......... ::. :, .::.; ::::. :;.....;.:. ~.'::.: .:.!:.'i?/:?:'?.:}.:i/.;.:/::.,
9/2/2000 16:00 - 00:00 8.00 FISH DECOMP #3 1 380' Pulled tight at 181' pulled
150K lost 4 barbs
recovered small pieces
of line
#4 2 183' Wad of line
#5 2 152' Wad of line
9/3/2000 00:00 - 08:00 8.00 FISH DECOMP Made back to back runs with rope spear on fishing BHA
Run Number Spear# Depth Recovery
#6 2 152' Wad of line & I band
#7 2 167' Wad on line & 2 bands
#8 2 168' small load
#9 2 168' no recovery
#10 2 152' full spear
#11 2 153' 1 OK pull full spear
#12 2 163' 60 K pull small amount
#13 2 123' 10 K pull full spear
#14 2 123' 5 K pull small amount
#15 2 123' 5 K pull lost bottom barb
no recovery change
spear.
# 16 1 121' 1 band & small amount
# 17 1 121' 10 k pull no recovery
# 18 1 121' no over pull no
recovery
#19 I 12' recovered a small
amount
08:00 - 10:00 2.00 FISH DECOMP Picked up mule shoe and TIH with same to 110' worked pipe and
attempted to work pipe down. Circulated hole and recovered rubber.
Worked down to 112'.
10:00 - 12:30 2.50 FISH DECOMP POH and lay down muleshoe. Picked up notched collar and RIH to
112'. Washed down to 114'.
12:30 - 14:30 2.00 FISH DECOMP Pulled out of the hole with notched collar and recovered small amount
of cable. Picked up rope spear and RIH with same to 121'. Pulled wad
of cable to surface.450' of cable. Made additional run and RIH to 400'
and recovered a small amount of cable.
14:30 - 19:00 4.50 FISH DECOMP TIH with spear to 2,080' working pipe every stand while going inm the
hole. No noticable weight Ioos due to cable. Filled hole and monitored
hole while pulling out of the hole. Had 10 K overpull at 30'. No control
line recovered.
19:00 - 22:00 3.00 FISH DECOMP TIH ti 2080' worked drill pipe every 60'. Tag tight spot at 395' to 420'.
POH with tight spot at 1212'.
22:00 - 22:30 0.50 FISH DECOMP Clean and clear rig floor
22:30 - 00:00 1.50 FISH DECOMP Held PJSM and rigged up Schlumberger 4 arm Call log
9/4/2000 00:00 - 02:00 2,00 FISH DECOMP RUN CALIPEPJCCL LOG. R/D LOGGERS. CALLAPSED CSG @
34-48', 52-66' & 110-120'.
Printed: 11/1/2000 10:17:53AM
Legal Well Name: A-07 Anchorage
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8/29/2000 End:
Contractor Name: N^BORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
9/4/2000 02:00 - 03:30 1.50 FISH DECOMP P/U 5 5/16" SWAGE ON 4 3/4" DCS. TAG @ 39 FT. WORK SWAGE,
NO PROGRESS,
03:30 - 11:30 8.00 FISH DECOMP P/U 3 - 6 1/4" DCS. WORK SWAGE THRU COLLAPSED CSG TO 66'.
11:30 - 16:00 4.50 FISH DECOMP PULL OUT OF THE HOLE AND WITH 5 5/16" CASING SWAGE.
cHANGE OUT TO 5 5/8" SWAGE. rih AND WORK THROUGH SPOT
AT 39' TO 43'.
16:00 - 18:00 2.00 FISH DECOMP PULL OUT OF THE HOLE WITH 5 5/8" SWAGE AND LAY DOWN
BOTTOM HOLE. MAKE UP MULE SHOE AND TIH TO 200'. PULL
OUT OF THE HOLE AND LAY DOWN BHA. HOLE IN GOOD SHAPE.
18:00 - 00:00 6.00 FISH DECOMP HELD PJSM AND RIGGED UP SCHLUMBERGER. RAN IN HOLE
WITH BAKER INFLATABLE BRIDGEPLUG AND SET AT 2,066' TOP
AND ELEMENT AT 2,074'. PULLED OFF DISCONNECT 1.375"
FISHING NECK ON IBP. POOH AND RIGGED DOWN
SCHLUMBERGER
9/5/2000 00:00 - 03:00 3.00 FISH DECOMP TRIP IN HOLE TO 1780'. DUMP 47 SXS SAND DOWN DP. WAIT 15
MIN.
03:00- 04:00 1.00 FISH DECOMP POOH.
04:00 - 04:30 0.50! FISH DECOMP PRESSURE TEST RBP W/ANN. SI. PRESSURED UP TO 500 PSI,
BLED DOWN TO 210 PSI IN 15 MIN.
04:30 - 06:00 1.50 FISH DECOMP TRIP IN HOLE & TAG SD @ 2028 FT.
06:00 - 07:00 1.00 FISH DECOMP TRIP OUT OF HOLE.
07:00 - 08:00 1.00 FISH DECOMP MAKE UP MILL ASSY & TIH.
08:00 - 16:30 8.50 FISH DECOMP MILL OUT COLLAPSED AREAS IN CSG. 35-43', 51-63'. 113-120'.
REAM & CLEAN SAME. WOB 4K, 80 RPM.
16:30 - 18:00 1.50 FISH DECOMP POH, INSPECT BHA. MILL 1/2" OUT OF GAUGE. L/D MILL. CLEAR
FLOOR.
18:00 - 19:00 '1.00 FISH DECOMP P/U NEW 5 7/8" MILL ASSY.
19:00 - 00:00 5.00 FISH DECOMP MILL OUT COLLAPSED AREAS IN CSG. 35-43, 51-63, 113-120'.
9/6/2000 00:00 - 01:30 1.50 FISH DECOMP FINISH MILLING COLLAPSED CSG TO 120' POOH. INSPECT MILL
(GAUGED 5 3/4").
01:30-04:00 2.50 FISH DECOMP P/U95/8"CUTTER. TIH SPACE OUT & CUT CSG @151'. OBSERVE
WELL.
04:00 - 04:30 0.50 FISH DECOMP POOH & L/D CUTTER ASSY.
04:30 - 05:00 0.50 FISH DECOMP CIRCULATE 35 BBL DIESEL BLANKET INTO WELL.
05:00 - 06:00 1.00 FISH DECOMP OBSERVE WELL.
06:00 - 08:30 2.50 BOPSUF DECOMP N/D BOPE. REMOVE LOWER 13 5/8" SPOOL.
08:30 - 09:30 1.00 WHSUR DECOMP REMOVE TBG SPOOL.PULL PACK OFF.
09:30 - 10:30 1.00 WHSUR DECOMP BACK OUT BOLTS ON BRADENHEAD & INSTALL SLIP HANDLES.
10:30- 13:00 2.50 BOPSUF; DECOMP N/U BOPE.
13:00 - 19:30 6.50 FISH DECOMP M/U 9 5/8" CSG SPEAR. RIH & ATTEMPT TO TO PULL CSG.
PULLED TO 175K, WOULD NOT COME LOOSE. P/U JARS &
ACCELERATOR. JAR ON CSG. WOULD NOT COME
FREE.SHUCKED CSG, INSTALLED 8.9" GRAPPLE. JARRED ON
CSG & WOULD NOT COME FREE. L/D SPEAR ASSY.
19:30 - 20:00 0.50 FISH DECOMP RIH W/2 STANDS OF DP.
20:00 - 00:00 4.00 FISH DECOMP CIRCULATE HOLE W/HOT WATER & ATTEMPT TO THAW CSG
ANNULUS.
9/7/2000 00:00 - 07:30 7.50 FISH DECOMP CIRCULLATE HOT WATER AROUND CSG & ATTEMPT TO THAW
ANNULUS.
07:30 - 12:00 4.50 FISH DECOMP P/U SPEAR ASSY. RIH & JAR ON 9 5/8" CSG. WORKED PIPE UP
APPROX. 18". WOULD NOT COME FREE.
12:00- 15:00 3.00 FISH DECOMP N/D BOPE.
Printed: 11/1/2000 10:17:53AM
RECEWED
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8/29/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From - To Hours ·Task: ~.:.::~. :.':.Ph:as ',s~nptlon:¢:::o~;::O:pem~'ons:::,:.~:,~;::,:;;:,;;:;:;:~;.;::;::': : .... :,~.,-~:~;::.
9~7~2000 15:00 - 17:00 2.00 FISH DECOMP CUT OFF & DRESS CSG STUB.
17:00 - 21:30 4.50 FISH DECOMP INSTALL NEW SPOOLS. N/U BOPE & INSTALL TEST PLUG.
21:30 - 00:00 2.50 FISH DEOOMP TEST BOPE AS PERREQUIREMENTS. LP 250 PSI, HP 3500 PSI.
TEST, OK. WITNESSING WAIVED BY JOHN CRISP WI AOGCC.
91812000 00:00 - 01:30 1.50 BOPSUF DECOMP FINISH TESTING BOPE, TESTED OK. PULL TEST PLUG.
01:30 - 09:30 8.00 FISH DECOMP P/U MILLING ASSY. RIH & MILL OUT 9 5/8" CSG, (34-44', 51-74',
111-124') TO 6 11/16".
09:30 - 11:00 1.50 FISH DECOMP L/D MILL M/U 7.5" MILL ASSY W/6 1/4" DC. RIH.
11:00- 12:00 1.00 FISH DECOMP CLEAN OUT FLOW LINE, PLUGGED W/ THERMOOASE
INSULATION.MILL OUT CSG W/7.5" MILL.
12:00 - 14:00 2.00 FISH DECOMP CLEAN OUT FLOW LINE, PLUGGED W/THERMOCAS INSULATION.
14:00 - 18:00 4.00 FISH DECOMP MILL OUT 9 5/8" CSG, (36-45', 51-74', 111-124')
18:00 - 19:00 1.00 FISH DECOMP LJD MILL M/U 8" MILLASSY ON 6 1/4" DC. RIH.
19:00 - 00:00 5.00 FISH DECOMP MILL OUT 9 5/8" CSG, (34-45', 51-74', 110-124')
9/9/2000 00:00 - 01:00 1.00 FISH DECOMP FINISH MILLING OUT CSG TO 8".
01:00 - 02:00 1.00 FISH DECOMP POOH & L/D B' MILL.
02:00 - 03:00 1.00 FISH DECOMP TIH W/OPEN ENDED DP & TAG UP @ 2079'. NO SAND.
03:00 - 04:00 1.00 FISH DECOMP POOH& L/D SINGLES.
04:00 - 05:00 1.00 FISH DECOMP P/U 8 1/2" MILL ASSY. RIH.
05:00 - 11:30 6.50 FISH DECOMP MILL OUT CSG TO 8 1/2". (34-45', 51-74', 110-124') REAM & CLEAN
CSG.
11:30-12:30 1.00 FISH DECOMP L/D81/2"MILLINGASY&61/4"DCS.
12:30 - 14:00 1.50 FISH DECOMP P/U RTTS &CIRC VALVE. RIH TO 2054'. SET PKR.
14:00 - 16:00 2.00 FISH DECOMP PUMP 125 BBLS SEAWATER AROUND PKR @ 1.5 BPM & 600 PSI.
PKR HAD FAILED. FILLED ANNULUS, ANNULUS STAYED FULL
DURING ENTIRE OPERATION.
16:00 - 17:30 1.50 FISH DECOMP RELEASE PKR. ANNULUS DROPPED. POOH W/RTTS.
17:30 - 19:00 1.50 FISH DECOMP P/U 3" OVERSHOT, JARS & BUMPER SUB. RIH.
19:00 - 20:00 1.00 FISH DECOMP FILL HOLE. ENGAUGE FISH @ 2072'.
20:00 - 21:30 1.50 FISH DECOMP POOH & RECOVER IBP.
21:30- 22:30 1.00 FISH DECOMP L/D IBP & BHA.
22:30 - 00:00 1.50 FISH DECOMP P/U 8 1/8" WASH PIPE & RIH.
9/10/2000 00:00-01:00 1.00 FISH DECOMP RIH W/ 31/2" DP & WASH PIPE.
01:00 - 02:30 1.50 FISH DECOMP KELLY UP & BREAK CIRCULATION @ 2056'. CIRCULATE DOWN
OVER FISH @ 2080'. WASH DOWN TO 2112'. SET BACK KELLY.
02:30 - 04:30 2.00 FISH DECOMP POOH & L/D WASH PIPE.
04:30 - 07:00 2.50 FISH DECOMP P/U OVERSHOT ASSY & RIH.
07:00 - 07:30 0.50 FISH DECOMP ENGAUGE FISH. PULL 135-150K DRAGGING, WHILE COMING
FREE.
07:30 - 09:30 2.00 FISH DECOMP POOH W/3 1/2" DP TO FISH. RELEASE OVERSHOT.
09:30 - 18:00 8.50 FISH DECOMP POOH & L/D 4 1/2" TBG STRING.
18:00 - 19:30 1.50 FISH DECOMP L/D OVERSHOTASSY. CLEAR FOOR. R/U TO P/U 3 1/2" DP.
19:30 - 00:00 4.50 FISH DECOMP P/U 3 1/2" DP & RIH. HAD TO CIRC OUT DIESEL & INSULATION
EHILE RIH. @ 1460'. RIH TO 3450'.
9/11/2000 00:00 - 02:00 2.00 FISH DECOMP TIH WITH 3 1/2" DP
02:00 - 02:30 0.50 FISH DECOMP CIRCULATE OUT 60 BBLS DIESEL AND CRUDE AT 6580'
02:30 - 07:00 4.50 FISH DECOMP CONTINUE TO RIH WITH 3 1/2" DP to 9855'
07:00 - 08:00 1.00 FISH DECOMP BREAK CIRCULATION. 4 BPM AT 850#.
08:00 - 14:00 6.00 FISH DECOMP ROTATE 50 RMP. WASH F/9855' TO 9955'. INCREASE RATE TO 6
BPM AT 1400". CIRC HOLE CLEAN.
14:00- 18:00 4.00 FISH DECOMP TOH W/WASHPIPE
18:00-23:00 5.00 FISH DECOMP PU 8 3/8" OVERSHOT W/ 41/2" GRAPPLE. TIH W/ 31/2" DP TO
9950'.
Printed: 11/1/2000 10:17:53 AM
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8~29~2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From ;To HOurs T~S~ :~: '~:: r:: ............................. ............... :::::::iii ........ '"'"'ii
9/11/2000 23:00 - 00:00 1.00 FISH DEGOMP WORK DOWN OVER FISH. JUNK ON TOP OF FISH @ 9953' WORK
DOWN TO 9955' & HAD PRESSURE INCREASE FROM PAGKOFF.
DID NOT ENGAUGE FISH. TOO MUCH JUNK.
9/12/2000 00:00- 05:00 5.00 FISH DECOMP TOH W/3 1/2" DP & O/S
05:00 - 06:00 1.00 FISH DECOMP PU 8 3/8" WASHOVER SHOE W/8 118" WASHPIPE
06:00 - 10:00 4.00 FISH DECOMP TIH with washpipe, Picked up Kelly and tag top of 4 1/2" fish at 9,995'
10:00 - 17:00 7.00 FISH DECOMP Washed from 9955' to 9991' with 8 1/8" wash pipe ( hit hard spot from
9985' to 9987' Drilled conventionally ). Reverse circulated hole clean at
9991'. Set back kelly
17:00 - 22:00 5.00 FISH DECOMP Pulled out of the hole with 3 1/2" Drill Pipe and wash pipe. Laid down 8
1/8" wash pipe and 8 3/8" shoe.
22:00 - 23:00 1.00 FISH DECOMP Held prejob safety meeting covering "MAKE UP BHA and TIH with O/S
". Cleand rig floor
23:00 - 00:00 1.00 FISH DECOMP Trip in the hole with O/S, BHA and 3 1/2" Drill Pipe to 1,324'
9/13/2000 00:00 - 03:00 3.00 FISH DECOMP RTIH W/3 1/2" DP AND O/S
03:00 - 04:00 1.00 FISH DECOMP WASHOVER & ROTATE FISH. PU WT 141K, SO WT 110K,
ROTATING WT 123K
04:00 - 09:30 5.50 FISH DECOMP POOH WITH 3 1/2" DP
09:30 - 11:00 1.50 FISH DECOMP B/O AND LD SBR
11:00 - 14:30 3.50 FISH DECOMP MU O/S W/DUAL GRAPPLE, TIH TO +/- 7500'
14:30 - 16:00 1.50 FISH DECOMP SLIP AND CUT 84' DRILL LINE
16:00 - 17:00 1.00 FISH DECOMP CONT RIH. LATCH FISH AT 9968'
17:00 - 18:00 1.00 FISH DECOMP ATTEMPT TO RELEASE K-ANCHOR
18:00 - 23:30 5.50 FISH DECOMP TOH WET, DROP BALL DID NOT SEE SHEAR PSI, DROP STEEL
RABBIT. RECOVERED 22' OF K-ANCHOR
23:30 - 00:00 0.50 FISH DECOMP LAYED DOWN O/S AND LD FISH. Anchor left in packer.
9/14/2000 00:00 - 00:30 0.50 FISH DECOMP CLEAR RIG FLOOR PREPARE TO PICK UP MILL ASSEMBLY
00:30 - 05:00 4.50 FISH DECOMP PU PKR MILL 8.5" WITH 3 7/8" BULL NOSE ON JB. TIH TO 9958'.
PICK UP W'I' 141K#, SLACK W'I' 110K#, ROT VVT 122K#
05:00 - 06:00 1.00 FISH DECOMP KELLEY UP & TAG PKR @ 9988'
06:00 - 14:00 8.00 FISH DECOMP MILL PACKER FROM 9988' TO 9994'. UNABLE TO MAKE PACKER
FALL DOWN HOLE
14:00 - 16:00 2.00 FISH DECOMP REVERSE CIRCULATE HOLE CLEAN, 4 1/2 PBM, 700 PSI. SET
BACK KELLY
16:00 - 17:30 1.50 FISH DECOMP POOH FROM 9,994' TO 9119, HAD DRAG FROM 9K TO 39 K OVER
PICKUP W'I' OF 141K#, SLKWT 110K#. HOLE SWABBING WHILE
PULLING OUT OF HOLE
17:30- 22:30 5.00 FISH DECOMP OBSERVE WELL FOR FLOW. WELL STATIC. CIRCULATE
/ BOTTOMS UP 4.8 BPM @ 900 PSI PUMPED A TOTAL OF 11,500
/ STROKES. HAD SLIGHT SHOW OF GASFROM BOTTOMS UP AT
/
SURFACE AFTER 10,700 STROKES. PUMPED ADDITIONAL 800
STROKES FOR A TOTAL OF 11,500 STROKES=672 BBLS OF SEA
WATER
22:30 - 00:00 1.50 FISH DECOMP MONITOR WELL 10 MIN, OK. PULL SLOW 25K OVER PICKUP WT.
WELL SWABBING, FILL DRILL PIPE ON EACH STAND WHILE
PULLING OUT OF THE HOLE. CONT. TO PULL SLOW TO 8580'.
DRILL PIPE PULLING WET. LOST ALL OVERPULL AT 8,580'. PICK
UP WT @ 125K. CONTINUED TO PULL OUT OF THE HOLE WATCH
FOR JUNK. WELL QUIT SWABBING AND TAKING PROPER FILL
WHILE PULLING OUT OF THE HOLE. PULLED OUT OF THE HOLE
WITH MILLING ASSEMBLY TO SURFACE.
9/15/2000 00:00 - 01:00 1.00 FISH DECOMP CONTINUE TO PULL OUT OF HOLE WITH MILL TO SURFACE.
Printed: 11/1/2000 10:17:53 AM
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Sta~: 8/29D000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From - To Task :~:
9/15/2000 01:00 - 01:30 0.50 FISH DECOMP ~Y DOWN BHA. CL~R AND CLaN RIG FLOOR. ALL 3 JUNK
BASKETS FULL OF S~LL FINE METAL CU~INGS & PIECES OF
CONTROL LINE.
01:30 - 04:00 2.50 FISH DECOMP PULL WEAR RING AND SET TEST PLUG. FILL BOP EQUIPMENT.
TEST BOP EQUIPMENT TO 250 / 3000 PSI, TEST ANNU~R TO 250
/ 3000 PSI. RD TEST EQUIPMENT, BLOW DOWN LINE, AND PULL
TEST PLUG
04:00 - 07:30 3.50 FISH DECOMP MU 4.8' SPEAR ASSEMBLY. TIH WITH 3 1/2' DRILLPIPE.
07:30 - 10:30 3.00 FISH DECOMP PICK UP KELLY AND ENGAGE FISH AT 9994'. JAR ON FISH.
pULLED 90K OVER PICK UP WEIGHT TO TRY WORKING FREE.
NO LUCK. REL~SE SP~R. SET BACK KELLY.
10:30 - 14:30 4.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE. ~Y DOWN SPEAR
14:30 - 15:30 1.00: FISH DECOMP MU PACKER MILL ASSEMBLY. CLEAR FLOOR.
15:30 - 18:00 2.50 FISH DECOMP TIH WITH 3 1D" DRILLPIPE AND MILL ASSEMBLY
18:00-23:00 5.00 FISH DECOMP PICK UP KELLY AND TAG TOP OF PACKER AT 9994'. MILL2'
FROM 9994 TO 9996'. PACKER FELL FREE
23:00 - 00:00 1.00 FISH DECOMP PUSH PACKER TO 10027' AND CIRCU~TE BOSOMS UP.
9/16/2000 00:00 - 01:00 1.00 FISH DECOMP CONTINUE TO PUSH PACKER TO 10,027' AND CIRCU~TE
BOSOMS UP.
01:00 - 06:00 5.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE AND MILL
06:00 - 08:00 2.00 FISH DECOMP BREAK OUT MILL AND BOOT BASKETS. CLEAN OUT SAME AND
CLEAR RIG FLOOR. ~KE UP SPEAR AND BHA TO PICK UP
MILLED PACKER.
08:00 - 10:30 2.50 FISH DECOMP TIH WITH 3 1/2" DRILLPIPE AND SP~R.
10:30 - 11:00 0.50 FISH DECOMP PICK UP KELLY. ENGAGE FISH AT 10,027'. SET BACK KELLY.
11:00 - 15:30 4.50 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE. FISH D~GGING UP TO 40K OVER
PICKUP WEIGHT.
15:30 - 18:00 2.50 FISH DECOMP PULL BHA. BREAK OUT AND ~Y DOWN FISH. CLEAR FLOOR.
MAKE UP POLISHING MILL.
18:00 - 22:00 4.00 FISH DECOMP RIH WITH 3 1/2" DRILLPIPE.
22:00 - 23:00 1.00 FISH DECOMP TAG AND POLISH 7" AT 10,028'. PUMP 4 BPM AT 750 PSI AND 80
RPM.
23:00 - 00:00 1.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE
9/17/2000 00:00 - 02:30 2.50 CLaN DECOMP CONTINUE TO POOH WITH 3 1/2" DRILLPIPE
02:30 - 03:30 1.00 CASE DECOMP ~Y DOWN BHA AND CL~R RIG FLOOR
03:30 - 12:00 8.50 CASE DECOMP RIGGED UP SCHLUMBERGER AND RIH WITH 8.5" GAUGE RING
AND JB TO 45'. UNABLE TO GET DOWN. POH AND PICKED UP
8.1" GAUGE RINGAND JB AND RIH TO 177'. NO PROBLEM. POH
AND PICKED UP 6.1" GAUGE RING WITH JB. RIH TO 10,074'.
UNABLE TO GET DOWN. POH AND CHANGE OUT GAUGE RING
WITH 5.95" GAUGE RING. RIH TO 10,082'. UNABLE TO GET
DOWN. POH AND PICKED UP 8.37" GAUGE RING AND JB. RIH TO
45' AND SAT DOWN. POH AND PICKED UP 8.25" GAUGE RING
WITH JB TO 45'. UNABLE TO GET DOWN. POH WITH GAUGE
RING. RIG DOWN SCHLUMBERGER
12:00 - 17:00 5.00 CASE DECOMP MU 8 1/2" STRING MILL BHA. RIH AND R~MED SPOT FROM
33'-56' WITH NO PROBLEMS. REAMED FROM 56'-63' WITH 2K
D~G. R~MED FROM 76' TO 89' AND D~G CLONED UP.
CONTINUED TO R~M DOWN TO 152' WITH NO PROBLEM.
17:00 - 18:00 1.00 CASE DECOMP RIH WITH 8 1/2" MILL ASSEMBLY TO 2,180'. NO PROBLEMS
ENCOUNTERED.
18:00 - 19:30 1.50 CASE DECOMP POH WITH 3 1D" DP
19:30 - 20:30 1.00 CASE DECOMP ~Y DOWN 8 1D" BHA ASSEMBLY AND CLEAR RIG FLOOR
Printed: 11/1/2000 10:17:53 AM
Legal Well Name: A-07 Anchorage
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8~29~2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From- Tol' Hours Task i~:~'::':!i :::~:?:~h'~i;!ii' i ~iiiiiib~.~i~ti~ii!~ b~ti~
9/17/2000 20:30 - 21:30 1.00 CASE DECOMP PICKED UP 6" MILL AND 6" STRING MILL. MADE UP 6" MILL BHA
21:30 - 23:00 1.50 CASE DECOMP RIH WITH 6" MILL BHA AND 3 1/2" DRILL PIPE TO 4,250'
23:00 - 00:00 1.00 CASE DECOMP CUT AND SLIP 84' OF DRILLING LINE
9/18/2000 00:00 - 02:30 2.50 CASE DECOMP Cont. to rih with 6" Water melon mill to 10428' Seen no Obstruction.
02:30 - 07:30 5.00 CASE DECOMP POOH & Lay Dn Mill & Watermelon Mill.
12:00 - 17:00 5.00 CASE SCAL DECOMP MU 6" Bit & 7" 26~ Scraper & rih to 1042' & reverse circ. 2-drill pipe
volumes.
17:00 - 22:00 5.00 CASE SCAL DECOMP POOH with Scraper & lay dn same & clean floor.
22:00 - 23:59 1.98 CASE DECOMP Make up HOWCO ESZV Bridge plug & rih with same.
9/19/2000 00:00 - 03:00 3.00 CASE DECOMP TIH to 10299' With Howco ESZV Drilll.
03:00 - 03:30 0.50 CASE DECOMP Set ESZV Drill Plug at 10,299' in 7" liner
03:30 - 06:00 2.50 CASE DECOMP POOH with ESZV Setting Tool to 2300'
06:00- 06:30 0.50 CASE DECOMP Service Rig
06:30 - 09:00 2.50 CASE DECOMP Continue to pull out of the hole with EZSV Setting Tool and Lay down
same
09:00 - 11:00 2.00 CASE DECOMP Make up 9 5/8" RTTS and RIH to to 2,162' and set RTTS in 9 5/8"
casing.
11:00 - 11:30 0.50 CASE DECOMP Pressured up down drill pipe to 1000 psi to tes EZSV at 10,299', 7" x 9
5/8" liner lap and RTTS packer. Held for 15 minutes. Good test.
Relaeased pressure
11:30 - 13:00 1.50 CASE DECOMP TOH with 9 5/8" RTTS and laid down Same
13:00 - 15:00 2.00 CASE DECOMP Picked Up 9 5/8" RBP and RIH to 2152'. Set at 2,152'. Picked up off
RBP 1 stand and spotted 400 # of 20/40 Carbolite.
15:00 - 16:30 1.50 CASE DECOMP POH with 3 1/2" drill pipe and running tool
16:30 - 18:00 1.50 CASE DECOMP Make up casing cutter and RIH with same. Cut off 9 5/8" casing 3'
below casing slips.
18:00 - 20:00 2.00 WHSUR DECOMP Nipple Down BOPE. 3'- 9 5/8" stub pulled out with Tubing Spool.
20:00 - 22:30 2.50 WHSUR DECOMP Pulled 9 5/8" casing slips. Changed out drilling spool
22:30 - 00:00 1.50 WHSUR DECOMP Nipple Up 13 3/8" 5,000 # BOPE
9/20/2000 00:00 - 01:30 1.50 BOPSUR DECOMP -NU 13 3/8" 5,000 # BOPE
01:30 - 04:00 2.50 BOPSUI; DECOMP Test BOPE to 250/3500 psi. Annular to 3500 psi. RD test Equip
04:00 - 05:00 1.00 CLEAN DECOMP RIH w/Retieving tool to retrieve 9 5/8" RBP
05:00 - 06:00 1.00 CLEAN DECOMP Reverse circulate at 4 bpm. Washed 7' of sand off top of RBP at 2152'.
Circulated hole clean. Latched and released RBP
06:00 - 07:30 1.50 CLEAN DECOMP Toh & lay down HES Plug & Clear floor
07:30 - 09:00 1.50 BOPSUR COMP set test plug & change rams to 7" & test to 3500 psi.
09:00 - 10:30 1.50 CASE TIEB1 Rig casing tools to run 7" tie-back.
10:30 - 23:59 13.48 CASE TIEB1 Run 7" csg. to 8900'
9/21/2000 00:00 - 01:30 1.50 CASE TIEB1 cont to rih with 7' csg. to 10028'
01:30 - 03:00 1.50 CASE TIEB1 rig up 200 ton elevators & dowell cmt. head.
03:00 - 06:00 3.00 CASE TIEB1 circ. at 3-BPM & Sting in to Tiebck to verify space out. & pick up and
continue to circ. 2-annular volumes @ 5-6 BPM
06:00 - 09:00 3.00 CASE TIEB1 Pump 50-bbl. h20 +290 sxs lead cmt. 10.9 ppg. +85-sxs tail 15.8 ppg. &
put in place with 381 bbl. sea H20 plug bumped.
09:00 - 09:30 0.50 CASE TIEB1 Set baker tieback packer & pull 50 k over.
09:30 - 15:00 5.50 WHSUR TIEB1 nipple down bop & set 7" slips & cut off & dress same & nu cameron
well head equipment & test same to 5000 psi.
15:00 - 18:00 3.00 BOPSUF COMP Nipple up BOP & test same to 3500/250 psi.
18:00 - 21:00 3.00 CASE COMP Make up TAM tool & rih to 2189' & locate & open tool
21:00 - 22:30 1.50 DHEQP COMP Freeze protect well with dead crude pumped 114-bbl. down annulus &
took returns through drill pipe until crude at surface & close valve &
reverse out excess crude in drill pipe to tiger tank.
22:30 - 23:59 1.48 DHEQP COMP pooh with tam setting tool & lay dn same & prepare to set wear ring.
Printed: 11/1/2000 10:17:53 AM
Legal Well Name: A-07
iCommon Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 8~29~2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From- To:i Hours :Task:
;9/22/2000 00:00 - 00:30 0.50 WHSUR COMP Run & set wear ring in head
00:30 - 01:00 0.50 CASE COMP Pressure test csg. to 3500 psi. OK.
01:00 - 05:00 4.00 CLEAN COMP Mu 6" bit & junk basket & rih with same to drill float equipment.
05:00 - 14:30 9.50 CLEAN COMP Tag. cmt. stringer @ 9892' & drill & wash out to 9929' & continue to
clean out 7" to 10254'
14:30 - 15:30 1.00~ CLEAN COMP circ. bottoms up @ 5-BPM
15:30 - 17:00 1.50 CASE COMP Pressure test csg. to 3500 psi. after drill all float equipment. OK.
17:00 - 20:30 3.50 CASE COMP Repair electrical panel for mud pump.
20:30 - 23:59 3.48 CASE COMP clean out to ez-drill plug @ 10299' & drilling out.
9/23/2000 00:00 - 00:30 0.50 CASE COMP Drill Howco ESZY Bridge plug. 10299'
00:30 - 01:30 1.00 CLEAN COMP Pick up singles to 11599'
01:30 - 04:30 3.00 CLEAN COMP rotate & wash down in 7" csg. had hard spots at time. 11599'--11700'
04:30 - 06:00 1.50 CLEAN COMP circ. & condition hole & upmp 40-bbl. high vis sweep. 4.5 bpm @ 1150
psi.
06:00 - 07:00 1.00 CLEAN COMP cont. to clean well bore F/11700--11785'
07:00 - 13:30 6.50 CLEAN COMP Circ. Hi -Vis Sweep & displace well bore with cln-Filtered sea water.
13:30 - 23:30 10.00 CLEAN COMP POOH Laying down 3.5" drill pipe & BHA.
9/24/2000 12:00- 12:30 0,50 CLEAN FILL COMP set wear ring.
12:30 - 13:30 1.00 CLEAN FILL COMP Make up 5.95" reverse circ. basket & scraper.
13:30 - 23:30 10,00 CLEAN FILL COMP pick up 3.5" drill pipe to 10131'
23:30 - 23:59 0.48 CLEAN FILL COMP rig up hot oil to pump hot diesel.
9/25/2000 00:00 - 00:30 0.50 CLEAN FILL COMP Pumped 60 bbls. of Hot diesel down drill pipe
00:30 - 02:00 1.50 CLEAN FILL COMP Closed Rams and Bull Headed 70 bbls. of Seawater down drill pipe at
8997' at 1.5 bpm at 1500 psi. Released pressure opend rams.
02:00 - 02:30 0,50 CLEAN FILL COMP RIH with 3 1/2" drill pipe in stands to 10,130'.
02:30 - 04:00 1,50 CLEAN FILL COMP Pumped 40 bbl Hi Vis sweep down annulus and reversed out
recovered small pieces of rubber,traces of sand, and debris
04:00 - 05:00 1.00 CLEAN FILL COMP Monitor well. Cut and slip 84' of drilling line
05:00 - 11:30 6.50 CLEAN FILL COMP TOH whilst laying down 3 1/2" drill pipe
11:30 - 12:00 0.50 CLEAN FILL COMP Lay down reverse circulating basket and 7" casing scraper
12:00 - 13:00 1,00 CLEAN FILL COMP Rig Up Hallibuton Slickline Unit
13:00 - 17:30 4,50 CLEAN FILL COMP RIH with 5.985" GR & JB. Run # 1 RIH to 10,097' recovered rubber and
small metal pieces. Run# 2 RIH to 10,080' and recovered rubber( less
than Run # 1). Run # 3 RIH to 10,070'. Almost no recoveryw/trace of
metal cuttings.
17:30- 18:00 0.50 CLEAN FILL COMP Rig Down Halliburton SlickLine unit.
18:00 - 18:30 0.50 WHSUR COMP Pull Wear ring
18:30 - 20:00 1.50 RUNCOI~! COMP !Held PJSM, Picked up Casing toolsand rig up to run 4 1/2" Cr
i completion string
20:00 - 20:30 0.50 RUNCOI~! COMP !Picked up and Ran tail assembly and 7" production packer
20:30 - 00:00 3.50 RUNCOI~I COMP RIH with 4 1/2" production tubing to 980'
9/26/2000 00:00 - 04:00 4.00 RUNCOI~! COMP Run in the Hole with 4 1/2" Completion assembly
04:00 - 05:00 1.00 RUNCOI~! COMP Change out power tongs.
05:00 - 00:00 19.00 RUNCOI~ COMP Run in the hole w/4 1/2" Completion Assy. Ran 235 jts tbg.
9/27/2000 00:00 - 01:00 1.00 RUNCOI~! COMP RUN IN HOLE VV/COMPLETION ASSY TO 10042'.
01:00 - 02:00 1.00 RUNCOI~I COMP MAKE UP LANDING JT. & LAND HGR.
02:00 - 03:30 1.50 RUNCOI~! COMP REVERSE CIRCULATE W/INHIBITED BRINE. 3 BPM @ 250 PSI.
03:30 - 04:00 0.50 RUNCOr~ COMP DROP BALL & PRESSURE TEST LINES TO 4500 PSI, OK.
04:00 - 04:30 0.50 RUNCOI~ COMP PRESSURE UP TO 4000 PSI, SET PKR. TEST TBG TO 4000 PSI
FOR 30 MIN, OK.
04:30 - 06:00 1.50 RUNCOI~ COMP BLEED OFF PRESSURE TO 1500 PSIi PRESSURE UP ON
ANNULIUS TO 1500 PSI, ANNULUS WOULD NOT HOLD
PRESSURE. ATTEMPT RE-TEST, TEST FAILED.
Printed: 11/1/2000 10:17:53AM
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Sta~: 8/29/2000 End:
Contractor Name: NABORS Rig Release: Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From To HOurs Task.
. . : Code
9/27/2000 06:00 - 08:00 2.00 RUNCO~ COMP ~D ~NDING JT. FILL BACKSIDE & MONITOR WELL.
08:00 - 14:00 6.00 RUNCO~ COMP ~U SLICKLINE EQUIP. SET STOP CATCHER
KICKOVER TOOL & PULL RP SH~R VALVE. (GLM 50' DEEP TO
TALLY) RIH & SET DUMMY IN GLM. ~D SLICKLINE EQUIP.
14:00 - 15:00 1.00 RUNCO~ COMP TEST TBG TO 3800 PSI, OK. OPEN 9 5/8" X 7" ANNULUS & PUMP
DOWN 7" X 4 1/2" ANNULUS W/2200 PSI ON TBG. NO RETURNS.
SHUT IN 9 5/8" ANNULUS. REVERSR CIRCU~TE AROUND 7"
ANNULUS & UP 4 1/2" TBG. CONFIRM PKR NOT HOLDING.
15:00 - 20:30 5.50 RUNCO~ COMP ~U SLICKLINE EQUIP RIH & RECOVER CATCHER SUB. RIH &
RECOVER BALL & ROD. RIH & RECOVER RHC PLUG. ~D
SLICKLINE EQUIP.
20:30 - 00:00 3.50 BOPSUF COMP SET ~C TEST BOPE. HP 3500 PSI, LP 250 PSI. TESTED OK.
TEST WAIVED BY JOHN CRISP W/AOGCC.
9/28/2000 00:00 - 00:30 0.50 BOPSUF COMP ~D TEST JT & RETRIEVE ~C VALVE.
00:30 - 04:00 3.50 PULL COMP ~U SCHLUMBERGER & RUN CCL TO 10250' & LOCATE TBG TP,
PKR & GLMs. PKR 2 10071-10075'. WLEG ~ 10115' (SEE CCL LOG
F/DETAILS)
04:00 - 08:30 4.50 PULL COMP POOH & RIH W/CHEMICAL CU~ER, CUT TBG ~ 10030'. ~D
SCHLUMBERGER.
08:30 - 10:00 1.50 PULL COMP M/U ~NDING JT. PULL HANGER & ~D SAME. (P/U ~ 89K) ~U
TO ~D TBG STRING.
10:00 - 00:00 14.00 PULL COMP POOH & ~D COMPLETION STRING.
9/29/2000 00:00 - 03:30 3.50 PULL COMP FINISH PULLING OUT OF HOLE W/COMPLETION STRING. GOOD
CLEAN CUT. RECOVERED 245 JTS + 19.22' CUT-OFF JT ~D CSG
TOOLS & CLEAR FLOOR.
03:30 - 04:30 1.00 REST COMP LOAD PIPE SHED W/3 1/2" KILL STRING. TALLY SAME. ~U TO
RUN TBG.
0~:30 - 08:00 3.50 REST COMP P/U 3 1/2" 8 RD EUE 9.~ TBG & RIH. ~N 72 JTS TL 2250.09'
08:00 - 10:00 2.00 REST COMP CLEAR FLOOR, POOH & STAND BACK KILL STRING.
10:00 - 13:00 3.00 REST COMP CLEAR OFF FLOOR AR~. ESTABLISH FLUID LOSS ~TE ( 8 BPH)
WAIT ON RBP.
13:00 - 18:00 5.00 REST COMP ~U SCHLUMBERGER. RIH & SET RBP & 9990'. POOH.
18;00 - 19:00 1.00 REST COMP PRESSURE TEST RBP TO 3500 PSI FOR 10 MIN, OK.
19:00 - 19:30 0.50 REST COMP ~D SCHLUMBERGER.
19:30 - 20:30 1.00i REST COMP RIH W/3 1/2" KILL STRING. SET ~ 2278'
20:30 - 21:30 1.00 WHSUR COMP M/U & ~ND HANGER. TIGHTEN LOCK DOWN SCREWS.
21:30 - 22:00 0.50 WHSUR ~ COMP INSTALL & TEST ~C
22:00 - 00:00 2.00 BOPSU~ COMP N/D BOPE.
9/30/2000 00:00 - 02:30 2.50 BOPSUR COMP NU X-MAS TREE & ADAPTER F~NGE. TEST 5000 PSI, OK. PULL
~C.
02:30 - 03:30 1.00 BOPSU~ COMP ~U & REVERSE CIRCU~TE 80 BBLS OF DIESEL & FREEZE
PROTECT WELL.
03:30 - 04:30 1.00 BOPSU~ COMP ~D HARD LINES & SECURE WELLH~D.
04:30 - 05:00 0.50 BOPSU~ COMP SET BPV.
05:00 - 06:00 1.00 BOPSU~ COMP ~D SECURE CEL~R. RELEASE RIG ~ 0600 HRS.
Printed: 11/1/2000 10:17:53 AM
........ .. ::: :.~ :.:.~ ....... ..:~.....~ ::: :~.~: ::.~.:: ~:::~ ~.:...:: ...~.........::~.~.:~:::~.:::.~.~.~.~.~:: ~ ~::::~ .:_.:...::.::....:.:..:.: ..¥:~;~f~f~.~:;~?~: ~ :..':::~.-:.~ :~:~:.~:::~:~:.~..:::~:.. :..::::~ ~: ............. :::.:.: ::::::::::::::::::::::::::
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 1/13/1974
Event Name: WORKOVER Start: 1/'16/2001 End:
Contractor Name: NABORS Rig Release: 1/24/2001 Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date : From- t° HOurs. Task:i:: :~:~:::i;; i::;:~i~:~i";; ::::::::::::::::::::::::::::i:.:!~:::.!:.!.i:.:?i~!i~!:;~!i:.?ii:.i::::.::!i:~:~::!6~i~i~!~!~:..~p~j:~:: :: :.;:'"!
1/16/2001 21:00 - 22:30 1.50 MOB PRE Scope and Lower Derrick
22:30 - 23:30 1.00 MOB PRE Move Rig from D-13a to A-07
23:30 - 00:00 0.50 MOB PRE Spot and Berm Sub, Pits & Pipe Shed
1/17/2001 00:00 - 01:30 1.50 MOB PRE Spot & Berm Sub, Pits, And pipe shed.
01:30 - 03:00 1.50 RIGU PRE Raise and scope derrick
03:00 - 04:30 1.50 RIGU PRE Spot and Berm Tiger Tank, Rig Up Lines to tree,& Tiger tank, Fill Pits
with 8.5 ppg Sea water.
04:30 - 08:30 4.00 VVHSUR DECOMP Pick up Lubricator and attempt to pull BPV, Ice in tree, Pulling tool
separated, bleed annulus down
08:30 - 10:00 1.50 WHSUR DECOMP Nipple down tree, retrieve pulling tool, ensure BP valve will move
10:00 - 14:00 4.00 VVHSUR DECOMP Nipple up BOP and lines
14:00 - 15:00 1.00 VVHSUR DECOMP Rig up Lubricator and pull BPV
15:00 - 16:00 1.00 VVHSUR DECOMP Install TWC valve and tested to 3,500 psi. Rig down lubricator
16:00 - 19:00 3.00 VVHSUR DECOMP Tested BOP equipment to 250 psi/3500 psi/annular 2500 psi
BOP test witness waived by John Spaulding of AOGCC
19:00 - 20:00 1.00 VVHSUR DECOMP Pull TWCV. Pick up spear and make up same
20:00 - 20:30 0.50 VVHSUR DECOMP Pressure test lines to 3,000 psi.
20:30 - 22:00 1.50 VVHSUR DECOMP Displaced diesel from well bore to tiger tank. Pumped at 4 bpm rate at
200 psi.
22:00 - 00:00 2.00 VVHSUR DECOMP RIH with spear dressed with 3.947" grapple, attempted to spear 4 1/2"
NSCT pup joint. Unable to fully engage grapple. Released and POH
with spear. Picked up spear with 8" extension dressed with 3.001"
grapple.
1/18/2001 00:00 - 02:00 2.00 WHSURi DECOMP Make up Spear No 2 dressed with 3.001" grapple and attempt to spear
3 1/2" tubing below hanger, no success. Laid down Idg jt. Picked up
Spear No.1 dressed with 3.947" grapple ,4 3/4" drill collarand RIH and
speared hanger and 4 1/2" NSCT pup it. Backed out Lock Down
Screws
02:00 - 03:00 1.00 WHSUR DECOMP Pull hanger to floor. Pick up wt 27 K. Laid down hanger and spear.
03:00 - 05:00 2.001 PULL DECOMP Pull Out of the Hole with 24 stands of 3 1/2" Tubing
05:00 - 08:00 3.00! PULL DECOMP Made up retieving toll for 7" RBP and RIH with same on 3 1/2" tubing to
2247'.
08:00 - 15:00 7.00 PULL DECOMP Pick up XO from 3 1/2" 8 rd tubing to3 1/2" IF drill pipe. RIH while
picking up 3 1/2" drill pipe to 9,990'.
15:00 - 15:30 0.50 PULL DECOMP Latched RBP, equalized, and pulled free. Dropped down 20' past set
3oint to confirm RBP was released.
15:30- 16:30 1.00 PULL DECOMP Circulated Bottoms Up.
16:30 - 23:30 7.00 PULL DECOMP Monitor well for flow. Pulled out of the hole while laying down 3 1/2" drill
pipe. Losses to the hole 12 bbl/hr
23:30 - 00:00 0.50 PULL DECOMP Rig down floor and rig up to lay down 3 1/2" tubing
1/19/2001 00:00 - 02:00 2.00 PULL DECOMP TOH and Lay down 3 1/2" tubing
02:00 - 11:00 9.00 RUNCOI~ COMP Load pipe shed w/4 1/2" tubing -RU to Run 4 1/2" completion
11:00 - 00:00 13.00 RUNCOI~] COMP Held PJSM and TIH with 4 1/2" completion assembly to 7,800'
1/20/2001 00:00 - 03:30 3.50 RUNCOI~I COMP Run in hole w/4 1/2" completion assy.
03:30 - 05:30 2.00 RUNCOI~I COMP Rig up & circulate w/seawater. 5BPM @ 200 @ 200 psi.
05:30 - 07:30 2.00 RUNCOI~] COMP Space out tbg string. Tag up on old tbg stub. Slack off to engauge
overshot on stub. Old pkr assy moving down hole. Pushed down 43 ft.
07:30 - 08:30 1.00 RUNCOI~I COMP Lay down 1 jt of tbg. M/U hanger & land same. (bottom of new
completion @ 10073 ft.)
08:30 - 14:00 5.50 RUNCOI~] COMP R/U slickline equip. RIH w/3.75" drift, located 'X" nipples & bottom of
completion, vvhen out bottom of completion string & pulled up. Old
completion started slipping down hole while attempting to pull up into
tail pipe assy. Old pkr assy slid down to 10463'. Could not get VV/L tools
Printed: 1/26/2001 4:23:20PM
Legal Well Name: A-07
Common Well Name: A-07 Spud Date: 111311974
Event Name: WORKOVER StaK: 1/1612001 End:
Contractor Name: NABORS Rig Release: 112412001 Group: RIG
Rig Name: NABORS 4ES Rig Number: 4ES
Date From- To: ~ Hou: :r::s::~..:.:. :~Task::. ::'
1/20/2001 08:30- 14:00 5.50 RUNCO~ COMP free.
14:00 - 17:00 3.00 RUNCO~ UUNK COMP M/U Kinley cutter, drop & cut W/L. POOH. Left cuEer in hole, dropped
off W/L while pulling out of hole. ~D slickline equip.
17:00 - 18:00 1.00 PULL OTHR COMP M/U landing jt & puli hanger. UD same.
18:00 - 00:00 6.00 PULL OTHR COMP POH while laying down 4 1/2" OR tubing to 6003' 98 its laid down
1/21/2001 00:00 - 09:00 9.00 PULL OTHR COMP POH while laying down 4 1/2" CR tubing.
09:00 - 10:30 1.50 FISH COMP Rig down 4 1/2" NSCT running equipment, rig down floor Icad pipe
shed with drill pipe
10:30 - 11:00 0.50 FISH COMP Rig up floor to run 3 1/2" drill pipe
11:00 - 12:30 1.50 FISH COMP Pick up fishing tools and Make up fishing BHA dressed with 4 1/2"
basket grapple and 5 7~8" OD overshot bowl
12:30 - 22:30 10.00 FISH COMP Trip in the hole while pi~ing up 3 1/2" drill pipe from pipe shed. Tagged
fish at 10,377' and pushed down hole to 10,397' and engaged overshot.
22:30 - 00:00 1.50 FISH COMP Circulated boEoms up and monitored well. well static. Set back kelly
1/22/2001 00:00 - 06:00 6.00 FISH COMP Pull Out of the hole with 3 1/2" drill pipe, BHA and fish
06:00 - 07:30 1.50 FISH COMP Laydown fish and fishing BHA
07:30 - 08:30 1.00 CLEAN COMP Make up Cleanout BHA
08:30 - 09:00 0.50 CLEAN COMP RIH to 2100'
09:00 - 10:30 1.50 CLaN COMP Slip and cut drilling line
10:30 - 15:00 4.50 CLEAN COMP TIH to 111,654'
15:00 - 16:30 1.50 CL~N COMP Pick up Kelly and tag boEom wash and mamfmm 11,654' to 11,700'
16:30 - 00:00 7.50 CLEAN COMP POH and lay down 3 1/2" DP
1/23/2001 00:00 - 00:30 0.50 RUNCO~I COMP UD BHA.
00:30 - 03:30 3.00 RUNCO~! COMP LOAD 4 1/2" 0R-13 TBG IN PIPE SHED, TALLY SAME.
03:30 - 04:30 1.00 RUNCO~ COMP ~U TO RUN TBG. CHANGE TP ASSY.
04:30 - 06:00 1.50 RUNCOA COMP M/U TP ASSY W/WLEG & 'XN' NIPPLE.
06:00 - 00:00 18.00 RUNCOAI COMP RUN IN HOLE W/4 1/2" COMPLETION STRING. ~N 244 JTS. TL
9997'. (SEE COMPLETION REPORT)
1/24/2001 00:00 - 01:00 1.00 RUNCOA COMP M/U HANGER & ~ND SAME. RILDS. P/U ~ 103K, SIC 80K.
01:00 - 02:30 1.50 RUNCOA COMP ~U & REVERSE ClRCU~TE INHIBITOR IN PKR ANNULUS. 3 BPM
~ 250 PsL
02:30 - 04:00 1.50 RUNCO! COMP DROP BALL & ROD. WAIT TO S~T IN NIPPLE. A~EMPT TO
PRESSURE UP & SET PKR. BALL NOT SEATED.
04:00 - 06:00 2.00 RUNCOI COMP WAIT ON SLICKLINE EQUIP.
06:00 - 10:00 4.00 RUNCOI COMP ~U SLICKLINE EQUIP. RIH W/3.6" BELL GUIDE & PUSH BALL TO
SEAT IN 'XN' NIPPLE.
10:00 - 11:30 1.50 DHEQP COMP PRESSURE UP & SET PKR. TEST TBG TO 3500 PSI, 30 MIN, OK.
BLEED OFF TBG TO 1500 PSI. PRESSURE UP ANNULUS TO 3000
PSI & HOLS FOR 30 MIN, OK. BLEED OFFF TBG & SHEAR RP
VALVE.
11:30 - 12:30 1.00 REST COMP ~D SLICKLINE EQUIP & INSTALL ~C IN HANGER.
12:30- 14:30 2.00! RIGD COMP N/D BOPE.
14:30 - 15:30 1.00 RIGD COMP N/U X-MAS TREE.
15:30 - 16:30 1.00 RIGD COMP PRESSURE TEST X-MAS TREE & HANGER VOID TO 5000 PSI.
16:30 - 18:00 1.50 RIGD COMP ~U LUBRICATOR & PULL ~C.
18:00 - 20:30 2.50 RIGD COMP REVERSE ClRC 105 BBLS DIESEL TO FREEZE PROTECT WELL. 2
BPM ~ 1400 PSI.
20:30 - 21:30 1.00 RIGD COMP INSTALL BPV.
21:30 - 22:00 0.50 RIGD COMP CLEAN CEL~R & SECURE WELL. RELEASE RIG ~ 2200 HRS,
1-24-01.
Printed: 1/26/2001 4:23:20 PM
'3 0 ? E; 5, '} '72 7 ! 7
12/12/96
To: Blair Wondzell
P! Supervisor
R~: Water & Gas to Su~ace ~ BPX PBU A-Pad -- . ·
We got the gas sample analogous back from the lab and it ~s confirmed -
that the sample ~s Li~ Gas and not MI.
.___ Lift gas was shut off in the five wells one at a time, when the LG in well A-
7 was shut-in and the IA bled off, the gas bubbling and water in all cellars
subsided. It took about 3 hours for the water to evacuate the cellar in A-5. !
wen~ back to the Pad at about 6:00 PM, there was no water in any of the-"'~ellars
however there was gas still bubbling up in A-5 & 40 cellars. The injection rate on
well A-Si had been brought back up to 3350 psi, and all annuli were bled to 100
+/- psi. The gravel inside and outside of the cellars of A-___5~4_.0 & 4_3 had subsided
about 24" this subsidence extended about two foot around the outside of the
weilhouses.
Tomorrow 12/13/96 we will simulate the same condJtions that existed
w~en the flow to surface commenced, if A-7 will continue to flow ali night without
LG. This should confirm or deny that A-~ the fault of this flow.
I will write a real report to you and David after we have the final results of
tomorrow's simulation. This is just a FYI to keep you up to speed on the issue.
If you have any other questions you need answered please call me at 448-1227
or page me and I will do my best to answer them for you.
Doug Amos
RECEIVED
L')EC I $ 1996
Alaska 0il & G3s Cons. Commission
Memorandum
Production Supt. ~a~,,: 12111196
Ken Smith, N.S.P.E
subj.=: A,-Pa~d Fresh W, iater/Gas Production in Cellars
The following is a chronological break down of events on A-Pad
involving wells A-5, A~7, A-Si, A-40 and A-43.
Date: Daily events
1¢6-96
1¢:8-96
1~-9-96
GC-3 produced water system was shut down for 18 hours
for repairs in skid 301.
Subsidence was reported in well house of Well A-43.
Well A-08i was converted from produced water(PW) to :" .'.
miscible injection (MI). This is the first time A-08i has been ·
on miscible injection. The following readings were on produced
water.
FWHP:1050psig, FWRT: 140deg F, IA: 100psig, CA: 560psig
1¢,.10-96 A-pad & X-pad went down due to logic problems, ali wells were
down for 5 hours.
A-08i well readings on MI; WHP:3350 psig, WHT: 130 deg F,
IA: zero, CA: zero
The night Pad Operator found standing water in the cellar
in well A-7.
The day Pad Operater found flooding with gas bubbling in well
houses A-43, A-40, and A-5 cellars. LEL readings are found to
be as high as 30% in cellar but only a traCe inches above cellar.
Twenty four hour man watch initiated by Production Engineers.
Samples of w~ter taken by BPX lab and found to be fresh at
1000 ppm chlorides. Area has been roped off and access
restricted. Peak vac truck brought on location and sucking down
cellars as needed.
Alaska 0il & C:~s Cons.
knchcr~.g0
Miscible Injection was shut in on well A-Si. No effect was found on
offset wells. Well was brought back on at half rate to monitor watt
integrity. A-Si casing pressures remain at zero.
10-11-96
Night pad operator reported major subsidence plus water/gas in
Well A-43 well house. Well A-5 has major gas/water
production. Gas samples taken from Well A-5 cellar by BPX lab.
Vac Truck recovered 1000 bbls of water from cellars.
Watedgas production has ceased in Well A-7. Wells A-43 and
A-40 have subsided by 30%. Well A-5 watedgas production
continues unchanged. Waiting on gas analysis.
Vac truck ceases liquid recovery but remains on location with man
watch.
Subsidence of wails in question since September 1996:
A-07: None
A-05: 4 yards of gravel
A-40: 10 yards of gravel
A-43: 62 yards of gravel
Note: Previous records could not be found by subsidence crew.
Night Pad Operator reports conditions are improving. Area remains
restricted and man watch continues.
Please find attached the pad map, Pad Operator's daily readings and
comments.
Course of action and Interpretation.
Continue to monitor wells and sample liquid and gas production for possible
well integrity failure, At this time a suspected failure of well Integrity is not
warranted. The source of the fresh water is assumed to be from known
underground streams which were documented prior to pad construction in the
early 1970's. The suspected cause of the problem is continued melting of the
permafrost by each wells proximity and the migration of gases known to exist in
and under the permafrost.
·
Alask.3. 0it & ¢ ~mS Cons.
FLARE
PIT
WELL PAD A Illlll
as of July, 1996 ]]111
Illlilllllli)lill~ltllllltlllll}ll~llilllllillllllllllllilllllSV
_J
'-'I2GCC '-~kOF'E :i'lri,iT
SUMP
39
TO D PAD
·
~8
SEWAGE
~92 SWi
IEOH
[] WELL AND 6' PRODUCTION LINE
· ~. WELL, 6' PRODUCTION UNE,
AND 3' GLT LINE
· WELL, 6' WSW LINE,
AND 4' MI LINE
O WELL, 4' PRODUCTION LINE,
AND 3' GLT LINE
· SUBSIDENCE WELL
'~' GLT'rWINS:WELLS A-41 & A-34A
A-23 & A-24
^-9 & A-39
A-2 & A.-4
M! TRUNK & LATERAL:
WELLS A-3 & A-51 A-11 & A-35 /
A-16 & A-31 / A-21 & A-27
O CELLAR ONLY
I~ PRODUCTION & GLT TWIN: A-P_;?. & A-.42
-~' WSW TWIN
ITl WELLHEAD AND CELLAR
0il & G~.s Cons.
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 23 March 1995
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
7~-09 (44-03-11-13)
.... 07.. ( 12-26-11-13 )
DESCRIPTION
1 PDK FINAL BL+RF
1 PLS FINAL BL+RF
1 CN/GR/CCL FNL BL+RF
1 GR/CCL FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
926 06
4824.02
5617.10
5953.08
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by:
Date:
Please sign and ~,~turn
Petrotechnical Data Ce~te~
BP F~:plcr~:.'t !on
900 ~'~,~3 ~ :,-.: s on
Received
APR..
Alaska 0ii & Gas Cons. Commission
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 26 July 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
# DESCRIPTION
1 PL STATIC FINAL BL
1 PL STATIC RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1 PL STATIC FINAL BL
1 PL STATIC RF SEPIA
1 PL STATIC FINAL BL
1 PL STATIC RF SEPIA
ECC No.
Run # 1 3924.02
Run # 1
Run # 1 6170.05
Run # 1
Run # 1
Run # 1
5665.07
Run # 1 6163.01
Run # 1
Run # 1 4824.01
Run # 1
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
~~ /~. Rodney D. Paulson
Please sign and return to:
Petrotechnical Data Center
BP Exploration (Alaska) Ine
900 East Benson Boulevard
Anchorage, Alaak~
Date
STATE OF ALASKA , ~ ~
o,.,,,,,,:, IGINAI.
REPORT OF SUNDRY WELL OPERATIONS"
1. Operations performed: Operation shutdown
Stimulate_J_ Plugging Perforate X
Pull tubing Alter casing Repair well . Other.
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 64.69 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface
1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM
At top of productive interval
2600' NSL, 198' EWL, SEC,. 26, T11N, R13E, UPM
At effective depth
2681' NSL, 204' EWL, SEC,. 26, T11N, R13E, UPM
At total depth
2725' NSL, 206' EWL, SEC,. 26, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11899 feet
BKB 9068 feet
11804 feet
BKB 8984 feet
Casing
Structural
Conductor
Surface
Intermediate
Length
..
100
2679
8455
8. Well number
A-07 (12-26-11-13) PBU
9. Permit number/approval number
73-41 /
10. APl number
50- 029-20131
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Junk (measured)
X-plug in XN nipple at 11806'
fi//at 11804' (07/90)
Size Cemented Measured depth True vertical depth
BKB
20 145 sx 119 119
13 3/8 3250 sx 2698 2698
9 5/8 2275 sx 2107- I ~)5i,,~ 2107"7~i~
Production
Liner
Perforation depth:
2099
1866
measured Sag R:
true vertical subsea:
Tubing (size, grade, and measured depth)
10 tieback string 2118 2118
7 850 sx 10028-11894 7631-9066
11510'- 11544' Ivishak: 11642'- 11681', 11664'- 11699', 11709'- 11756',
11766'-11796", 11810'-11835'
8665'-8693' (Sag R.)
8777'-8947' (five Ivishak intervals)
4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119'
Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9983'; 7" Otis WD packer at 11796'; 4 1/2" SSSVat2157'
i3. Stimulation or cement squeeze summary see attachment ~ E ~ E I V E L)
14.
Intervals treated (measured) J U L 2 1 199;
Treatment description including volumes used and final pressure Alaska 0ii & Gas Cons. Commission
Representative Daily Average Production or In!ecti0n D~,ta ~-,;';,C~6;'~.~
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
420 1666 340 1668 251
2220~ 3532 1131 1189 249
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations Oil Y~ Gas .. Suspended .
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
. Signed (~~,~ (~.~) '-~~ Title SeniorTechnica/Assistant,
Form 10-404 Rev 06/15/88
Service
SUBMIT IN DU~LICV'ATE "~
1/10/92
1/18/92
1/26/92
WELL A-07(12-26-11-13)
NRWO/Reperf/Frac
A NRWO was performed using the following fluids:
410 bbls PW to Load Well 5 bbls EW
95 bbls ACID 111 bbls PW
5 bbls EW(Preflush) 22 bbls Cement
10 bbls EW(Spacer) 30 bbls PW
33 bbls DUO Polymer(Contaminant)
35 bbls PW(Displacement)
315 bbls PW(Reverse Out)
51 bbls PW(Inj Test and Pooh)
36 bbls MEOH(Freeze Protection CT)
Well Cleaned Out to 11782'
650 bbls load fluid behind pipe
12 bbls cement recovered(does not include cement not
pumped)
ACID: 15% HCL W/10% XYLENE, 1% WS-36, .4% HAI-85,
45 PPT FERCHEK-A
CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2%
CFR-3,016% HR-12, .12 GAL/SK HALAD-344 L
SQUEEZE #1
A NRWO was performed using the following fluids:
175 bbls PW 49 bbls PW Jet Pass
5 bbls EW(Preflush) 22 bbls Cement
24 bbls EW(Spacer) 32 bbls Duo Polymer(Contaminant)
1 bbls PW(Displacement)
30 bbls PW(CMT Contamination)
231 bbls PW(Reverse Out)
49 bbls PW(Jet Pass) 36 bbls PW(Final Reverse Out)
49 bbls Recovered(N2 Displacement)
37 bbls MEOH(Freeze Protection CT)
Well Cleaned Out to 11730'
15 bbls Cement Recovered
CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2%
CFR-3, .12% HR-12, .15 GAL/SK HALAD-344L
SQUEEZE #2
The following intervals were reperforated using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
11641'- 11681' MD RECEIVED
d U L '~ 1 199~
Alaska Oil & Gas Cons. Commission
Anchorage
PAGE 2
2/13/92
8/09/92
8/12/92
8/16/92
8/18/92
Oh
7/16/93
WELL A-07(12-26-11-13)
A Hydraulic Fracture treatment was performed uisng the
following fluids:
150 bbls PAD W/567 Gal ESL(9%)
42 bbls 1 PPG 16 bbls 2 PPG
22 bbls 3 PPG 25 bbls 4 PPG
29 bbls 5 PPG 30 bbls 6 PPG
31 bbls 7 PPG 32 bbls 8 PPG
33 bbls 9 PPG 112 bbls 10 PPG
196 bbls 50# Gel Flush
The following intervals were reperforated using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
11641' - 11674' MD
A REFRAC was performed using the following fluids:
10 bbls 40# Gel Prepad to Establish Rate
150 bbls 40# X-Link Gel Pad
506 bbls Frac Clean Volume
102 bbls 20# Linear Gel Flush
The following intervals were reperforated using 3 3/8"
guns, 6 SPF, random orientation and 60° phasing.
11524' - 11544' MD
11510' - 11524' MD
A Sag Frac was performed using the following fluids:
10 bbls 40# Gel Prepad to Establish Rate
228 bbls 40# X-Link Gel Pad W/0% ESL ~
17 Dirty i PPG 22 Dirty 2 PPG
29 Dirty 3 PPG 34 Dirty 4 PPG
37 Dirty 5 PPG 40 Dirty 6 PPG
42 Dirty 7 PPG 480 Dirty 8 PPG
196 Dirty 20 #Linear Gel Flush
R ¢ iVED
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 03-03-93
T# 84406
BP CH LOGS
Enclosed is your copy of the materials listed below.
If you have any questions, please contact BP Well
Records at (907) 564-4004.
A-07~w~~~CH
F-39~CH
K-06~CH
M-31__~~CH
N-14~~_CH
N-16~CH
S-33~~_~CH
x- ~ 4~
02/23/93 REF#124752
02/22/93 REF#124751
02/23/93 REF#124673
02/24/93 REF#124674
02/26/93 REF#124801
02/25/93 REF#124675
02/25/93 REF#124754
02/24/93 REF#124753
PRODUCTION LOGGING SERV ATLAS
PRODUCTION LOGGING SERV ATLAS
COLLAR LOG (CHEMICAL CU ATLAS
PFC GAMMA RAY (PERFORAT ATLAS
PFC GAMMA RAY (PERFORAT ATLAS
PRODUCTION LOGGING SERV ATLAS
PRODUCTION LOGGING SERV ATLAS
PFC/CCL (PERFORATION RE ATLAS
Information Services
Well Records
AJaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 12/30/92
T# 84191
BP/ PBU CH (PRODUCTION) LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
A-07 PERF
A-24 ~Z' ?O PERF
N-2 1 ~ ~..~ PERF
09/08/92 #1
06/25/92 #1
09/25/92 #1
09/28/92 #1
9854.00-11648.00 HALIBUR 5 "
10800.00-11306.00 HALIBUR 5 "
8724.00- 9355.00 HALIBUR 5 "
10900.00-11208.00 HALIBUR 5 "
Information Control
Well Records
EIVE. D
JAN 0 4 199
Naska 0ii & Gas Cons.
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 10/27/92
T# 84002
BP CH LOGS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
A-07 ~o$t PER~O~..~ ~o~O08/16/92 #1 ~'/
N-09 ~'7~ PERF ~, 07/23/92 #1%,/
9800.00-11524.00 HALIBUR 10 "
9100.00- 9400.00 HALIBUR 10 "
Information Control
Well Records
R CEIVED
OCT 2 9 1992
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exl~loration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
3
DATE: 02/03/92
T~ 83229
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
B-01 ~g~ COMPLETION
A-07 ~3- ~/ COMPLETION
D-19 ~2-~t ~D~-P
01/23/92 91
01/25/92 #1
01/26/92 91
01/24/92 91
10400.00-10610.00 SCH
9450.00- 9699.00 SCH
11400.00-11689.00 SCH
8800.00- 9480.00 SCH
5 "
5 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
FEB ~ 2 1992
Alaska 0il & C=as Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 01/28/92
T9 83212
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
01/05/92
01/11/92
01/15/92
01/02/92
12/31/92
01/14/92
01/18/92
9792.00-10683.00 HLS
9840.00-11790.00 HLS
9750.00-10082.00 HLS
9156.00- 9770.00 HLS
9100.00- 9750.00 HLS
9001.00- 9205.00 HLS
1740.00-10602.00 HLS
~
5 "
5 "
5 "
5 "
2 "
Information Control
Well Records
Adrian J. Martin
RECEIVED
· FEB 1 2. 199Z
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, A4,~.ka 99519-6612
(907) 561-5111
DATE: 01/16/92
T# 83187
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
12/28/91 #1
~ ~ PROD-F
~%-I GAS LIFT SURVEY 12/26/91 #1
25 ~'!, TEMP 12/26/91 #1
.~-ID"~ ~L~ PITS 12/30/91 #1
~-17A~I'II~GAS LIFT SURVEY 12/25/91 ~1
5 "
-24 J[~L~Y 12/28/91
~~ 5 "
9800.00-11774.00 CAMCO 5 "
7580.00-10455.00 CAMCO 2 "
8500.00- 9462.00 CAMCO 5 "
2000.00-10229.00 CAMCO 2 "
350.00- 9467.00 CAMCO 2 "
8500.00-10200.00 CAMCO 2/5"
8500.00- 9462.00 CAMCO 5 "
2000.00- 9984.00 CAMCO 2 "
8700.00- 9740.00 CAMCO 5 "
8500.00-10200.00 CAMCO
8500.00- 9462.00 CAMCO
Information Control
Well Records
Adrian J. Martin
RECEIVED
JAN 1992
Alaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
TO: DISTRIBUTION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Dar3:03/07/91
!.82217
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
A-07 PLS 03/03/91
F-46 PDK-100 02/27/91
F-46 SBL 02/27/91
M-26 PLS 03/02/91
W-31 CNL 02/28/91
#1
#1
#1
#1
#1
10320-11750 Atlas 5"
-8700-9520 Atlas 5"
8420-9510 Atlas 5"
10820-11554 Atlas 5"
11200-11901 Atlas 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
t ECEIVEb
MAR 1 ~ 1991
Alaska Oil & Oas Cons,
Anchorage Commission
STATE OF ALASKA
A~,~ OIL AND GAS CONSERVATION COMM~,~N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_._ Stimulate x Plugging
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska~ Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM
At top of productive Interval
2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM
At effective depth
2681' NSL, 204' EWL, SEC. 26, T11N, R13E, UPM
At total depth
2725' NSI, 206' EWL, SEC. 26, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11899feet
true vertical BKB 9068feet
Repair well
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Plugs (measured)
Perforate x
Other
6. Datum elevation (DF or KB)
KBE = 64.69 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
A~07 (12-26-11-13) PBU
9. Permit number/approval number
73-41/90-176, 90-547
10. APl number
50- 029.20131
11. Field/Pool
Prudhoe 0il Pool
X-plug in XN nipple at 11806'
Effective depth: measured 11804feet
true vertical BKB 8984feet
Junk (measured) fill at 11804' (07/90)
Casing Length Size Cemented
Structural --.
Conductor 100 20 145 sx
Surface 2679 13 3/8 3250 sx
Intermediate 8455 9 5/8 2275 sx
Production 2099 10 3/4 tieback string
Liner 1866 7 850 sx
Perforation depth: measured Sag R: 11510'- 11544'
Measured depth True vertical depth
BKB
119 119
2698 2698
2107.1 2107-7
2118 2118
10028-11894 7631-9066
Ivishak: 11642'-11681', 11684'-11699', 11709'-11756',
11766'-11796', 11810'-11835'
true vertical subsea: 8665'-8693' (Sag R.) _
8777'-8947' (five Ivishak intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119'
13. Stimulation or cement squeeze summary see attachment
1'4,
Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9983'; 7" Otis WD packer at 11796'; 4 1/2" $SSV at 2157'
RECi:Iv u
Intervals treated (measured)
Treatment description including volumes used and final pressure
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
JAN 1 8 1
Alaaks Oil & Gas Cons.
Tubing Pressure
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run L .
Daily Report of Well Operations X
770~' 846 1212 1664
767~'~ 868 1258 1696
16. Status of wellclassificaion as:
Oil X Gas Suspended..
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 10404 Rev 06/15/88
262
295
SUBMIT IN DUPLICATE
WELL A-07 (12-26-11-13} PBU
PLUG-BACK/STIMULATION/ADD. PERF OPERATIONS
5/18/90
5/24/90
5/27/90
7/18/90
Set X-plug in XN nipple of the WD packer.
Plugged back to a depth of 11769' with 900# sand.
Set CTU inflatable bridge plug at 11611' and acidized Zone 4 perfs with 176
bbls. 15% HCl w/diverter in four stages. Unseated packer and displaced with
diesel. Left plug in XN nipple and returned well to production.
Rigged up Schlumberger and perforated the following additional intervals using 3
3/8" carrier guns at 4 spf:
11510'- 11522' MD BKB (Sag R.)
11716'- 11726' MD BKB (Ivishak)
Returned well to production and tested.
jam
1/1 1/91
i E EIVED
Alaska.Oil & Gas Cons. Commission
"Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. 'Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :07/26/90
T#:81439
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
A-07 PERF 07/18/90 #1 11400-11762 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
R ES ER.V. OE~...----;~..-
ARCHIVES
RECEIVED
JUL ~
Alaska0il & Gas 00ns. uor~mission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 06/13/90
T8:81295
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
A-07 GR 05/25/90 81 9800-11769 CAMCO 5"
A-08 INJ 05/23/90 81 9500-9869 CAMCO 5"
B-11 PROD-F 05/24/90 81 10800-11149 CAMCO 5"
F-21 PROD-F 05/26/90 81 11300-11604 CAMCO 5"
N-16 PITS 05/28/90 81 9400-10325 CAMCO 5"
Q-06 PROD-F 05/25/90 81 10900-11390 CAMCO 5"
T-07 INJ 05/26/90 81 9100-9550 CAMCO 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSClENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
*b%go'/
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION
Date :06/08/90
T#:81255
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below.
Well Records at (907) 564-4445.
A-07 GR 05/18/90 #1
R-13 PERF 05/18/90 #1
W-07 GR 05/16/90 #1
W-07 PERF 05/16/90 #1
If you have any questions, please contact BP
11500-11803 HLS 5"
9600-9900 HLS 5"
13600-14500 HLS 5"
13600-14500 HLS 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR_ ----...
~'T'A-TE OF ALA-C~E;a[~J
ARCHIVES
,~/a~/e .,..,JlJtV 18 1990
u// & eas Con°
1. Type of Request:
STATE OFALASKA ~...~ 0 ~ !~
"~'--'-'ALASKA OIL AND GAS CONSERVATION COMMISSION ,~
APPLICATION FOR SUNDRY APPROVALS
Abandon Suspend Operation Shutdown Re-enter suspended well
Alter casing ~ Repair well __ Plugging Time extension Stimulate ~
Change approved program Pull tubing Variance ,, Perforate x Other
2. Name of Operator
BP Exploration (Alaska) inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM
At top of productive interval
2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM
At effective depth
2573' NSL, 5034' EWL, SEC. 26, T11N, R13E, UMI
At total depth
2725' NSL, 206' EWL, SEC. 26, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 11899 feet
true vertical BKB 9068 feet
5. Type of Well:
Development x
Exploratory .
Stra~graphic__
Service
6. Datum elevation (DF or KB)
KBE = 64.69 ' AMSL
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
~A-07 (12-26-11-13) PBU
Plugs (measured)
9. Permit number
73-41
10. APl number
50- 029-20131
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11759 feet Junk (measured) fill at 11818'
true vertical BKB 8944 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural -- BKB
Conductor 100 20 145 sx 119 119
Surface 2679 13 3/8 3250 sx 2698 2698
Intermediate 8455 9 5/8 2275 sx 2107-10562 2107-79
Production 2099 10 3/4 x 9 5/8 tieback st/~ng 2118 2118
Liner 1866 7 850 sx 10028-11894 7631-9066
Perforationdepth: measured Sag R: 11522'-11544' lvishak: 11642'-11681', 11684'-11699', 11709'-11716',
11726'-11756; 11766'-11796', 11810'-11835'
true vertical subsea: 8674'-8693' (Sag R.)
8777'-8947' (six ivishak intervals)
Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119'
Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 99833 7"Otis WDpackerat 11796; 4 1/2" SSSV at 2157"
13. Attachments Description summary of proposal X Detailed operations program BOP sketch
14. Estimated date for commencing operation
July 1990
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X Gas
Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title Supervisor Waterflood/Miscible Flood
FOR COMMISSION USE ONLY
Conditions of approval: Notify ~mmission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10-
Date ?
Approval No.
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Commissioner Date
Approved Copy
Rflturned
SUBMIT
TRIPLICATE
WELL A-07
ADD'L.
(12-26-11-13) PBU
PERFORATION
We propose to perforate the following additional intervals during July 1990:
11510' - 11522' MD BKB
11716'- 11726' MD BKB
Depths are referenced to BHCS, 2/12/74.
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to production immediately following perforating operations, then tested.
1~:7/11/90
· . o
FLOW TUBES
& PACKOFF
_ GREASE SEAL
FLOWTUBE
FL GREASE LINE
FLOWLINE
VALVE
"--~~_~ BOWEN"'rACKOFF
HAND PUMP
GREASE
//' "MANIFOLD
~~,~ GREASE
RISER
BOP
..,..-GREASE
RESERVOIR
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
March 27, 1990
Alaska Oil & Gas Conservation Commi~sion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
~ ~Well 'A~7' (12'26-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal
to perform remedial/capacity sustainment work on the well.
Yours,very t ruly~/,~ ,~
B. J. Policky ~
Supervisor Waterflood/Miscible Flood
BJP: JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
1, Type of Request:
STATE OF ALASKA
~_,,,,~KA OIL AND OAS CONSERVATION COMIV~. i.,..~ON 0 ~
APPLICATION FOR SUNDRY APPROVALS;
Abandon.. Suepend Operation Shutdown ~: Re-enter suspended well
Alter ~a~lng RapaJr well Plugging ~ Time extension... Stimulate X
Change approved program Pull tubing Variance ~ Perforate ~ Othe~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99819-8612
4. Location of well at surface
1700' SNL, 922' WEL, SEC,. 35, T11N, RI3E, UPM
At top of productive Interval
2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM
At effective depth
2688' NSL, 203' EWI., SEC. 26, T11N, R13E, UPM
At total depth
2725' NSL, 206' EWL, SEC,. 26, TI IN, RI3E, UPM
12. Present well condition summary
Total depth: measured 11899 feet
true vertical BKB 9068 feet
5. Type of Well:
Development X
Exploratory,,
Stratigraphio
Service
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 64.69 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
A-07 (12-26-11.13) PBU
9. Permit number
73-41
10. APl number
50- O29-2O131
11. Field/Pool
Prudhoe Oil Pool
Effective depth: measured 11818 feet
true vertical BKB 8996 feet
Junk (measured) fill at 11818'
Casing Length Size
Structural --
Conductor 100 20
Surface 2679 13 3/8
Intermediate 8455 9 ~8
Production 2099 10 3/4 x 9 ~/8
Liner 1866 7
Perforation depth: measured Sag R: 11522'- 11544'
true vertical subsea:
Cemented Measured depth True vertical depth
BKB
145 sx 119 119
3250 sx 2698 2698
2275 sx 2107-10562 2107-7
tieback string 2118 2118
850 sx 10028-11894 7631-9066
Ivishak: 11642'-11681', 11684'-11699', 11709'.11716',
11726'-11756', 11766'-11796', 11810'-11835'
8674'-8693' (Sag R.)
8777'-8947' (si~ Ivishak intewals)
ECEJVED
Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9983' with 4 1/2" tailpipe to 10119'
Packers and SSSV (type and measured depth) 9 ~'8" BOTpacker at 9983'; 7" Otis WD packer at 117c~S!~a 0ii & GaS
4 1/2" SSSVat 2157'
13. Attachments Description summary of proposal 3( Detailed operations program ... BOP sketch
14. Estimated date for commencing operation J
March/April 1990
16. If proposal was verbally approved Oil X Gas ~
Name of approver Date approved Sewice
17. I hereby certify that the foregoing i~ue.,and ~)rrect to the best of my knowledge.
Si~lned ~ Y_.~~ Title Supervisor Waterflood/Miscible Flood
./ ~' FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integr~ Test Subsequent form required 10-"~--.~-c~)//
ORIGINAL SIGNED
Approved by order of the Commission BY LONNIE C. SMITH
Form 10-403 Rev 06/15/88
15. Status of well classification as:
Suspended
,.,.
JApprova~ No. ct,O .- I ?~
Commissioner
Date ~-.z- ?~
SUBMIT IN TRIPLICATE
Coiled Tubing Blow-Out-Preventers
Coiled Tubing
Pack-Off
Blind Rams
Cutter Rams
Chicksan (Kill Line)
Slips
~-~ Pipe Rams
Pump-In Sub
(Circulate/Returns)
W ell Hoad
Swab V alv~i~;ka Oil & Gas Cons.
Anchorag0
A-07 PLUG BACK AND CTU HCL JOB
,
.
.
.
.
.
.
RU slickline and pull the SSSV. RIH with a maximum size drift and a TEL. Ensure
no obstruction exists in weilbore and tag PBTD. Last tag was 11812' on 6/1/87.
Set X-plug in the XN nipple of the WD packer. Dump 2 bailers full of CaCO3
sluggets on the plug.
Obtain a well test for informational purposes only.
Obtain wellhead sample. Using the API.;RP 42 emulsion testing procedures, test
emulsion tendencies when mixing a wellhead fluid sample with live and spent
15% HCL (with additives) at 180 deg F. Test with 5000 ppm ferric ion added.
Adjust the type and volumes of additives as dictated by the emulsion test results.
Plug back to a depth of 11756' with 40-70 sand. If TD has not changed from the
6/1/87 tag, 892 lbs will be required to fill the 40' ( @22.31 lbs/lin ft.).
After six hours rig up slickline and RIH with TEL and tag PBTD. Acceptable range
for sand top is 11754' to 11764 '. If sand top is not in this range, proceed with
action required to establish sand top in this interval.
After sand top is at the desired depth, rig up for a CTU acid job. Ensure a check
valve is installed between the well and pump van. Isolate SSSV. RIH with CTU
and inflatable bridge plug and set the BP in the 98' blank interval between 11544'
and 11642' MD.
Acidize 90 ' (360 holes) of Zone 4 perfs with 7200 gals 15% HCL acid and
additives shown on attached page. Maximum pressure is 4000 psi. Filter fluids to
3 microns. Pump as follows:
1)
2)
3)
4)
5)
6)
7)
9)
10)
1800g 15% HCI
1/3 diverter stage (120 lbs. = 1.0 ppp)
1800g 15% HCI
1/3 diverter stage (120 lbs. = 1.0 ppp)
1800g 15% HCI
1/3 diverter stage (120 lbs. = 1.0 ppp)
1800g 15% HCI
Unseat packer and reciprocate across perfs.
1800g arctic diesel with 10% mutual solvent
Displace to perfs with diesel
10. Rig down CT. Leave plug in WD packer. Return well to production and obtain maximum
rate test.
CLL 3/16/90
S~ondaKI Alaska
PToduction C~mpany%._,.?-"/
900 Eost Ben$on Boulevard
P.O. Box 196612
Anchorage. AIoska 99519-6612
t907) 564-511 I
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
INDEXED
·
STANDARD
ALASKA PRODUCTION
Date: 06/18/87
TI: 77970
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this offlce:
A-3
A-7
B-13
B- 23
E-11
U-5i
R- 23
Injection Profile 06/02/87 #1 11000-11963 Camco 5"
F1 owme her WHUT 06/01/87 #1 11450-11808 Camco
Injection Profile 06/0 2/87 #1 ' 10500-10853 Camco 5"
CCL-GR 06/05/87 #1 9880-9882 Camco 5"
WOPITS 06/5-6/87 #1 ,10300-10740 Camco 5"
Injection Profile 06/05/87 #1 - 8750-9437 Camco 5"
WOPITS 06/04/87 #1 11 200-1 2118 Camco 5"
Received
Date
Plack
a
I NFORMAT I ON CONTROL
Wel I Records LR2-1
A unit of the o~iginol Stondo,d CM Compony
Founded in Clevelond. Ohio. ,n 1870
Production Company
900 Eosf Benson Bo:,"
PO Bo. 196612
Anchorage, AIo sk o ~,~m'jq~
(907) 564-511 I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 06/04/86
TO: MOBIL r~: 77083
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
ALASFZ PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and retur'nlng It to thls office:
A-7 Temp. 05/17/86 #1 3100-9950 Camco 5"
A-34A Spinner 05/19/86 #i 8850-9i50 Camco 5"
B-16 Temp./GLM 04/16/86 #1 9500-9700 Camco 5"
B-23 WOPITS 05/21-22/86 #1 9300-9900 Camco 5"
F-24 Spinner 05/03/86 #2 11900-12300 camco 5"
N-20 Cont. Flow Survey 05/06/86 #1 9800-10100 GO 5"
N-22 Spinner 05/14/86 #1 10450-10700 Camco 5"
R-5 Temp/Spin 04/29-30/86 #2 8900-9200 Camco 5"
R-7 Injection Profile 04/30/86 #1&2 9600-10200 GO 5"
R-9 Pump-in Temp. 04/27-28/86 #1 8200-9712 Camco 5"
S-5 Pump-in Temp. 04/30/86 #1 10100-10550 Camco 5"
X-24 Injection Profile 05/02/86 #1 9200-9620 Camco 5"
Rece i ved
Date
~J~ ~ I Victoria Aldridge LR2-1
~ INFORMATION CONTROL
; ': Well Records LR2-1
f(,,,,,d,.cl ,,, Cl~,.eh..I (.)h,~ ,,: lEI/()
Standard Alaska
Production Company
·
900 East Benson Boulevo~,,~,~
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) .564-5111
April 28, 1986
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well A-7 (12-26-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our sub-
sequent report of perforating this well.
Yours very truly,
PFB: JAM ~
P. F. Barth
Supervisor, Reservoir/Production
Surveillance Unit I .
Enclosures (4)
cc: Drilling Well Files (MB12-1)
Well Records (LR2-1)
A-7 Well FiLe
RECEIVED
APR2 9 1986
Alaska 0il & Gas Cons. Commission
Anch0r~ge
A unit of the original Standard Oil Co,'npany
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALASKA 'L AND GAS CONSERVATION COMMI,(i"ON
REPORT SUNDRY WELL OPB'(ATIONS
1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate .~ Pull tubing
Alter Casing - Other ~
.
.
4.
Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
Location of well at surface
922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM
At top of productive interval
201' EWL, 2624' NSL, Sec. 26, TllN, R13E, UPM
At effective depth
(not available)
At total depth
206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM
5. Datum elevation (DF or KB)
[<;BE = 64.69
6, Unit or Property name
Prudhoe Bay Unit
7, Well number
A-7 (12-26-11-13) PBU
8. Approval number
N/A
9. APl number
50-- 029-20131
10. Pool
Prudhoe Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
11899 feet Plugs (measured)
9068 feetBKB
Feet
Effective depth: measured 11864 feet Junk (measured)
true vertical 9040 feet BKB
Casing Length Size Cemented
Structural --
Measured depth
True Vertical depth
BKB
Conductor 55 ' 20"
Surface 2653' 13 3/8" 3250 sx
Intermediate 8455' 9 5/8" 2275 sx
9 5/8"x10 3/4" tieback
~IX:~:;IX~N~[~ 2073 ' string
Liner 1866' 7" 850 sx
Perforation depth: measured
11522'-11544' (one Sag R. interval)
11642 '-11835' (six Ivishak intervals)
true vertical f ~ubsea)
8674 '-8693r
8777 ' -8947 '
Tubing (size. grade and measured depth)
4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119'
Packers and SSSV (type and measured depth)
9 5/8" BOT packer at 9983'
100'
2698'
2107-10562'
2118'
10028-11894'
100'
2698'
2107-7988'
2118'
7631-9066'
; 7" WD packer at 11796'; 4 1/2" Otissssv at 2157'
12. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
APR 2 9 1986
Aiask~ 011 & Gas Cons,
13.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf wateroBbI Casing Pressure
Tubing Pressure
Prior to well operation
2260 1792 691 0
222
Subsequent to operation
3310 2044 649 0
234
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run i~'
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Form 10.404 Rev. 12-1-85 Submit in Duplicate
PERFORATING DATA - Well A-7 (12-26-11-13) PBU
4/10/86
Pulled SSSV from ball valve nipple at 2157'.
4/11/86
Installed and tested lubricator to 3500 psi for all
well work. Rigged up Dresser Atlas and perforated
the following additional intervals using 3 1/8"
carrier guns at 4 spf:
11522' - 11544' MD BKB (8674' 8693' TVDss)~~-4~'
11642' - 11681' MD BKB (8777' - 8811' TVDss)
All depths are referenced to BHCS/GR, 2/12/74.
(Note: Due to an operational depth control problem,
the intervals are 5' deeper than those proposed in
the original Sundry Notice.)
Put well on production.
4/22/86
Reset and tested the SSSV in ball valve nipple at 2157'.
Well on production.
jm
4/23/86
SOHIO ALASKA PETROLEUM COMPANY .....
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
March 11, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
kttn: Mr. C. V. Chatterton
Well A-7 (12-26-11-13) PBU
Gentlemen:
Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named well. This contains our proposal to perforate
the well.
Very truly yours,
PFB: JAM~
Enclosures (3)
cc: Drilling Well Files (MB 12-1)
Well Records (LR 2-1)
A-7 Well File
4052m
P. F. Barth
Supervisor, Reservoir/
Production Surveillance Unit I
RECEIVED
1 1986
Alask~ Oil & Gas Cons. Commission
, STATE OF ALASKA
ALASK/~"OIL AND GAS CONSERVATION C~O~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
STANDARD ALASKA PRODUCTION COMPANY 73-41
3. Address 8. APl Number
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20131
4. Location of Well
At surface-
2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 64.69' AMSL
6. Lease Designation and Serial No.
ADL 28286
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
A-7 (12-26-11-13) PBU
11. FieldandPool
prudhoe Bay
Prudhoe Oil Pool~
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
(Submit in Triplicate)
Perforate [~ Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional intervals will be perforated in March/April, 1986 at 4 spf:
11522' - 11539' BKB (Ref. BHCS/GR, 2/12/74)
11642' - 11676' BKB ( " )
A lubricator will be installed and tested to 3500 psi for all.well work. An SSSV will
be reset and tested in the ball valve nipple at 2157'.
RECEIVED
MAR ! 1986
Alaska 0il & Gas Cons. Commission
Anchorage
14. I hereby certify that the foregoing is~true and correct to the best of my knowledge.
Signed - --v ~ Title Supvr. Reservoir/Production
The space below for Commission use P. F. Barth Surveillance Unit I
Date
Conditions of Approval, if any:
Approved by.
COMMISSIONER
By Order of
the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
January 20 ,
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well A-7 (12-26-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our subseqUent report of stimulating this well.
Yours very truly,
JAB: JAM ~
Enclosures (2)
cc:
Drilling Well Files
Well Records (LR2-1)
A-7 Well File
pA. Bragg u U
ervisor Production Operations
(MB12-1)
STATE OF ALASKA
ALASKA O~AND GAS CONSERVATION cO'~ISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~] OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 73-41
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20131
4. LocationofWell
At surface:
2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
..... KBE = 64.69,~, AMSL 12.
6. Lease Designation and Serial No.
ADL 28286
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
A-7 (12-26-11-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation E~ Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
A 2000 gal. HCl acid wash Via coiled tubing was performed on Well A-7 on December 8,
1985; followed by a 83-bbl. bullheaded scale inhibitor squeeze on December 13, 1985.
The well was shut in for 24' hours after the treatment. The SSSV was removed prior
to the stimulation and reset after t~e job at 2157'.
The treated intervals were as follows:
11684' - 11699' BKB
11709' - 11716' BKB
11726' - 11756' BKB
11766' - 11796' BKB
11810' - 11835' BKB
RE£E VED
2 1986
Alaska 0ii & Gas Cons. Couu~ission
Anchorage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~i~gned/!-~~ /~,~~. Title Sup, r. Production Operations
The space/b~1ow for Commission use . A. Bragg
/!
Conditions/of Approval, if any:
V
Date /--/7
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
November 13, 1985
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well A-7 (12-26-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and
Reports on Wells, for the above-named well. This contains
our proposal to stimulate the well.
Yours very truly,
JAB: JAM~~0
Enclosures (3)
cc: R. H. Reiley (MB12-1)
Well Records (LR2-1)
A-7 Well File
/J/. A. Bragg" 6/6)
//roduction operations Supervisor
RECEIVED
~sl<a 0i~ & Gas Cons. oom~SS~O~
knchor~e
STATE Of ALASKA ·
ALASKA (~ AND GAS CONSERVATION cO~'~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~
2. Name of Operator 7. Permit No.
SOHIO ALASKA PETROLEUM COMPANY 73-41
3. Address 8. APl Number
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20131
OTHER []
4. LocationofWell
At surface:
2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM
5. Elevationinfeet(indicateKB, DF, etc.)
KBE = 64.69' AMSL
6. Lease Designation and Serial No.
ADL 28286
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
A-7 (12-26-11-13) PBU
11. FieldandPool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
[] Other [] Pulling Tubing []
Pull Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
A 2000 gal. HCl acid wash, via coiled tubing, followed by a bullhead scale inhibitor
squeeze is proposed for Well A-7. The well will be shut in 24 hours after the treat-
ment. The SSSV will be removed prior to the stimulation and reset after the job at
2157'.
The perforated intervals to be treated are as follows:
11684' - 11699' BKB
11709' - 11716' BKB
11726' - 11756' BKB
11766' - 11796' BKB
11810' - 11835' BKB
This work is scheduled to commence in November/December, 1985.
RECE[VED
NOV !
Alaska 0il & Gas Cons. Commission
Anchorage
14. i hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~/~/~ ~~ TitleProdUction Operations Superviso~Date
space/~w fo~ C%mmi;sio'n"'use ~/U A. Bragg
The
/ ;
Conditi~,Fof Approval, if any:
Approved by
Approved Coho7
By Order of
COMMISSION~:R the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
To:SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL
PHILLIPS
STATE ~
BPAE (Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 08/02/85
T#: 76355
REFERENCE:
SOHI~NAL DATA - PRESSURE SURVEY DATA-
llowing material is being submitted herewith. Please acknowledge receipt by signing a
f this letter and returning it to this office:--
A-7 ~ Flowing Gradient 07/28/85 Camco
A-10 -~ " " 07/19/85 Camco
X-I-~ " " 07/26/85 Camco
X-2 -' " " '07/24/85 Camco
X-14 --' " " 07/14/85 Camco
Y-6" Static Gradient 07/29/85 Camco
" " " 07/27/85 Camco
Y-18 f
RECE,VED ................ ~:__~~ -.-~w-a Aldridge LR2-1
~~~/~ /~ .--~ '~0 5 ~ Technical Documentation
DATE ............ 19 .-s[~ecords Management
,--- cons'--"commm
Alaska Oil & Gas ·
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
April
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
· 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage· Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
WELL A-7 (12-26-11-13) PBU
Enclosed in duplicate is Form 10-403, Sundry Notices and Reports on Wells,
for the above-named well. This subsequent report completes the workover of
this well.
Very truly yours,
District Drilling Engineer
RHR:IBG:ckg
32085/0044G
Enclosure
cc: Well File 17
RECEIVED
, PR 0 8
0il & (~s Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA O" AND GAS CONSERVATION CO"MISSION
SUNDRY )i rlOE8 AND REIN)RTA-4N WELI,,
DRILLING WELL
COMPLETED WELL r-I
OTHER
2. Name of Operator
3. Addrm
4. Location of Well
At surface:
i700' SNL, 922' WEL, Sec. 35, TllN, R13E, UPM
7. Permit No.
73-/~ 1
8. APl Number
50- 029-20131
9. Unit or Lea~e Name
I~):-V~ ~u-ml~- ~ .....
A-7 (12-26-11-1,3).,. PBU
'I
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 64.69' AMSL ADL 28286
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
Prudhoe Bay
Prudhoe Oil Pool
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Ca~ing [] . Perforations [] Altering Casing
Stimulate [] Abandon ' [] Stimulation [] Abandonment
Repair Well [] Change Plans I"1 Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing [~
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
O
0
13. Describe PropofadorComplet~ O~mtiOm (Clearly s~teallpertinentdatailsend give ~rtinentdates, i~luding estimat~ ~ of lta~ing any
propoledwork, forAbandonmentlee20AAC25.105-170).
The following work was performed during the workover on Well A-7.
1. Moved rig in. Pulled BPV. Changed 7" tubing and 7', x 9 5/8" annulus over to 8.7 ppg
NaC1. Set 2-way check. ND tree. Installed and tested BOPE to 5000 psig.
2. Cut 7" tubing at 10,018'. Unable to pull t~ing. Cut 7" tubing at 9940' Pulled 7"-
_ ·
tubing. Recovered remaining 7" tubing and seal mandrel. Tested 9 5/8" and 7" casing
to 2500 psig. Cleaned out to 11,558' PBTD.
3. Set cement retainer at 11,804'. Established injection rate into perforations
(11,810'-11,835'). Displaced 40 cu. ft. Class 'G' cement to stinger. Stabbed into
retainer and squeezed 7 bbls. cement away. Cleaned out cement retainer.
4. Ran 7" packer/tailpipe assembly and set at 11,804'. Ran 4 1/2" tubing completion; set
9 5/8" packer at 9959". Install BPV. ND BOPE.
5. NU and tested tree to 5000 psig. Set packer. Tested tubing and annulus to 1000 psig.
Changed annulus over to 9.6 ppg NaC1 and tubing over to diesel. Ran and set SSSV. Set
BPV. Moved rig off.
This work was completed on March 16, 1985.
RECEIVED
APR 0 8 1985
Alaska 0ii & Gas Cons. Commission
Anchorage
14. I h~.l:fy~oing, it ,r~and correct ,o the best. of my knowledge.
Signed~_] ~,,~---~%~ ~ ~ ~ ~J~/' '- Title District Drilling Engineer
The r43acebelowforCommi.ionuse R.. 21~i~ey
Conditions of Approval, if any:
Approved by,
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1 ~0
Submit "Intentions" in Triplicate
and "Subsequent Reports" in DuPlicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCH ORAG E, ALASKA 99502-0612
January 16, 1985
Alaska Oil & Gas Conservation Cc~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well A-7 (12-26-11-13) PBU
Enclosed, in triplicate, is Form 10-403, sUndry Notices and Reports on
Wells, for the above-named well. This gives notice of intention to
change tubing.
Very truly yours,
RHR: IBG:pw
Enclosures
cc: Well File #17
RECEIVED
1 7
Alaska Oil & Gas Co~s, Commission
Anchorage
STATE OF ALASKA
ALASKA C~_,, AND GAS CONSERVATION CC...,M ISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL [] OTHER
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
P.O Box 6-612, Anchorage, Alaska
99502
4. LocationofWell
At Surface:
1700' SILL, 922' WEL,
SEc. 35, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 64.69' ~MSL
I 6. Lease Designation and Serial No.
ADL 23286
12.
7. Permit N°o
73-41
8. APl Number
50-029-20131
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
A-7 (12,26-11-13) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] . Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other t-'1
Pull Tubing I~ Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
During this workover a 4½" tubing completion with gas lift mandrels and an isolation packer
will be run in place of the 7-inch tubing. The work is schedUled for January 1985.
,
2.
3.
4.
5.
6.
.
.
10.
Punch 7" tubing 3 jts. above PBR.
Change 7" tbs. and 7" x 9 5/8" annulus over to 3.9 ppg NaC1. Install BPV.
Move in rig. N.D. tree. N.U. and test BOPE to 5000 psis.
Pull 7" tubing.
RIH with 6" bit, 7" csg. scraper, and 9 5/8" csg. scraper. Clean out to PBTD. POH.
RIH with 7" RTTS. Pressure test 9 5/8" csg. to 2500 psig. Set RTTS between 11~796'
and 11,810'. Test for cement isolation behind 7" liner between these intervals. Cemenl
squeeze for isolation if neccesary. POH.
Rig up wireline. RIH'and set 7" packer/tailpipe assembly at 11,800'. Rig down wirelin~
RIH w/4½" tubing completion consisting of 9 5/8" production packer, 4~" sliding sleeve,
and 4½" tubing to surface with 5 gas lift mandrels.
Change 4~" x 9 5/8" annulus over to clean 9.6 ppg NaC1 and the 4½" tbs. to diesel
through the sliding sleeve. Install BPV.
Install and test tree to 5000 psis. Secure well Move ;rig ~f~:.~ E] V E
D
~h~em-Work Re,port~'4t
14, I hereby certify that the f~ing is tr~ and corr~t to the best of my knowledge.
Sign~ Title Bi'~rri~r Dri] ! ing Engineer
Thes~ace bmBw ~r Commissio, use R. H. Retley
JAN 1 7 1985
Alaska Oil & R:~.~ Cons. O0~mi.~.~inn
Anchorage
Conditions of Approval, if any:
G¥ tOt~ll[ C.
Approved by COMMISSIONER
Approved Cop)'
Returned
/ --
By Order of
the Commission
Form 10-403
Rev. 7-1
Submit "Intentions'' in Triplicate
and "Subsequent RePorts" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
GETTY
TO~ SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIPS
STATE
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 4-25-84
CC#: 75245
BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
REFERENCE:
S~ FINAL DATA- P, RESSURE SURVEY DATA
~/~he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
A-7
S-5
Static Gradient
Static Gradient
4-11-84 Camco
3-22-84 Otis
(4/82)
.C. D
RECEIVED ......................... ,~%,,~~E~- '"' ~arolyn Bishop
Development Geology
DATE -Jkl,~e'b~--~-~e,(= 00~-C0mmJssJ0~ell Records
.............................. J'~il;[~t~,& v~ ~ ~
Anchorage
.SOHIO ALASKA PETROLEUM CO;V;PANY
SFO
ARCO
CHEVRON
EXXON
3111 "C" SIREE-I-
ANCHORAGE', ALASKA
TELEPHONE {907) 265-0000
MAIL: POUCH 6-61 2
ANCHORAGE, ALASKA 99502
GETTY
TO: SFO/UNIT/STATE:
(-Marathon) MOBIL
PHILLIP, S
TE OF AK .
BPAE (Transmittal Only)
CENTRAL FILES (CC#' s-Transmittal Only)
Date: 4/23/~2.
Trans.#: 1523
CC#: 49523
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
T~e'f'011owing material is being'submitted herewith. Please acknowledge receipt by signing a
ycopy of this letter and returning it to this office:--
C-7 EPL (ach) 3/9/82 #1 11400-11720 5"
C-7 EPL (Sch) 2/25/82 #1 11400-11705 5"
F-4 CNL (Sch) , 3/8/82 #9 9700-10561 5"
~;~ EPL (ach) 3/6/82 #1 11350.11802 5"
4/82)
Karen Mestas
Development Geology
Well Records
SO~{'O ALASKA FST.;::F)LfU',I COr, IPA.r',',Y
SFO
ARCO
CHEVRON
E >70N
'~o. SF0/UNIT/STATE:
(-Marathon)
GETTY
MOBIL
PHILLIPS
~iTransmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
3111 "C" STREE7
ANCHORAGE, ALASKA
IELEPHONE (907) 26570000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 3/18/82
Trans. #: 1435
CC#: 49435
R~E: ' .
A_ - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and r.eturning it to this office:--
SFO/UNIT/STATE:
C-7
C-ll
(-Marathon) PRESSURE SURVEY, DATA
Pressure Survey & BHPD (Sch) 3/9/82
" " " (Otis) 2/23/82
" " " (Sch) 2/24/82
" " " (Sch) 2/25/82
" " " (Go) 3/3/82
" " " (Sch) 3/3/82
" " " (Cam) 2/5/82
" " " (Sch) 3/8/82
C-7
C-3
D-7
C-15
B-3A
/82)
R~CE,VE~
~;~t'~t< 1 ~.'~..,,: Development Geology
DATE 19 Well Records
" A?~l<a Oi~ & G~:~ Cons.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
UHIO-BP ALASKA PRODUCTION DIVISION
3111 "C"STREET
,~HORAGE, /', LASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
A, NCHORAGE, ALASKA 99.502
UNIT/STATE/SFO Mobil
(- Marathon) Phil[{ps _ .- _ .... -
gPAE ....... ._-= ....
SFO.. _- ......_-=- ...............
REFERENCE:
/SOHIO PRESSURE DATA
'/"/ he following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
3/20/80
I_~['COMM~
I I ENG '
I 3 ENO ~
t-~ CEO~
Survey 3/6/80 " 3/4/80
" 2/z~/80
" 3/~/~0
" 3/zo/~o
" 3/s/~o
" 2/2~/80
" 2/25/80
" 3/?/80
" 2/2~/~0
" 2/2~/g0
" 2/22/80
3/2/80
A-2z--" Bottom Hole Pressure Data Form & Pressure
]3_6/ II ,, ,, ;, ,, ,,
C--1 ..... Il l' Il I' 1, ,,
C-3 L I1 ,, 11 ,1 ,, Il
C-7' II I1 [1, II II I1
D-4' ' " " " " " ,,
E-2 ~.-' " ' " ,, ,, ,, ,,
J-6 p/ " " " ,' ,, ,,
N_7~'' ,, ,, ,, ,, ,, ,,
R-5/ Bottom Hole Pressure Data Form & Pressure Survey
Well Records
DATE 19
SOHIO PET. ROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA99502
TO:
STATE OF ALASKA
3001 Porcuplna Drive
Anchorcd'e, ./'.~t~ok~ 09501
Attn: Mr. H. Han]ilton
STATE/UNIT/SFO
1/2]_/so
REFERENCE: SOHIO WELL DATA
·
Ilowing material is being submitted herewith. Please acknowledge 'receipt by signing a
'O/ copy of this letter and returning it to this office'-
~TE/UNIT (minus
Marathon) :
C-4 EPL 1/i/80 #2
~"
12 24/79 Bottom-Hole Pressure Data Form & Pressure
2/10/79 " " " "
C-1 12/28/79 " " " " "
C-9 12/13/79 " " " " "
C-10 12,/22/79 " " " " "
E-2 12/31/79 " " " " "'
E-4 12/23/79 " " " " "
F-1 1/1/80 " " " " "
F-2 1/7/80 " " " " "
F-3 1/1/80 " " " " "
F-5 12/21/79 " " " " "
F-6 12/23/79 " " " " "
F-7 12/29/79 " " " " "
F-8 1/2/80 " " " " "
G-2 1/5/80 " " " " "
N-1 12/7/80' " " " " "
N-2 12/20/79 " " " " "
Nm8 ........
/? --~ ~',~) ~-'~'~' /3q/~/ .Records
,.'.,,:.., / ·
RECEIVED ~_-/ ' ."../ .' , ¢¢4 .'% ' ' ". .....
DATE / 19 --
Survey
Il Il
Il Il
Il Il
II II
Il Il
Il Il
Il Il
Il II
Il Il
Il Il
Il Il
Il II
Il II
II Il
Il Il
Il Il
12/4/_7_9 .......... BottOmrHole .Pressure. Data Form &
uarol Krieter
·
Pressure Sur~
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
ALASI~]
ANCHORAGE,
1/4/80
State of Alaska
.f. ,'~'iJ OF ALASKA
"-'-,"~ O~1 & G~ Co~~~ ~,~~
,.
· -'o cupine Drive
A.,cho:age, Ala~ ~1
Attn: Mr. H.
REFERENCE: Sohio Data
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
C-10
}~agnetic Tape, PrintOut& Basic Info Sheet
DDNLL 10740-11960 11/12/79
C-1 Spinner Survey 11/30/79 #1 5"
Spinner Survey 11/26/79 #2 5"
4-Arm Caliper 12/4/79 #1 5"
D-3 4-Arm Caliper 12/3/79 #1 5~
N-8 Spinner Survey 12/7/79 #1 5'~
A-2 Spinner Survey 11/27/79,11./29/79 #1&2
Well Records
5I!
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
April 11, 1979
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
3111 "C" STRE~J
TELEPHONE (907) 265.
MAIL: POUCH 6-61~
Attn: Mr. H. Hamilton
Subject: A-7 (12-26-11-13)
C~_ntlemen:
Please find attached in triplicate, Form 10-403, Sundry Notices and
Reports on Wells, for the above mentioned well.
very truly yours,
-~. g. F~sga
District Field Engineer
cc: M.J. Smith
Drilling File
CC #7920
,.
Form' ! 0-4~8
REV. 1-10-~3
·
Subml t "1 ntentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELL L.-I OTHER
2. NAME OF OPERATOR Sohio Petroleum Company
Division of Sohio Natural Resources Inc.
3. ADDRESS OF OPERATOR
Pouch 6-612, .A~chorage, 2~aska 99502
4. LOCATION OF WELL
At surface
2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM
-. : -
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 64.69' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20131
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28286
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit West
9. WELL NO.
A-7 (12~26-11,-,13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
ll. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
\
Sec. 26, TllN, R13E, UPM
12. PERMIT NO.
73-41
3ort, or Other Data
NOTICE OF INTENTION TO;
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF..
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
:15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
The following intervals in the well will be reperforated using Schlumberger
4" Hyperjet~I1 carrier guns' during April.
11684 - 11699 ft. BKB (ref. BHCS/GR 2-12-74)
11709 - 11716 ft. BKB (ref. BHCS/GR 2-12-74)
11726 - 11756 ft. BKB (ref. BHCS/GR 2-12-74)
11766 - 11796 ft. BKB (ref. BHCS/GR 2-12-74)
11810 - 11835 ft. BKB (ref. BHCS/GR 2-12-74)
A~ch~ra§~
16. I hereby certlf~at ~g~e and correct
(This' space-f-or State °f~ce/~, ~ "~ff'-~: J~ ~1 [ ....... ~ J ~t~n ~': ~
TITLE _District Field En.q:i.~ee~
DATE_A~ril 12, 1979
APPROVED BY I]~ [~?.! ~ ~-""- TITLE
CONDITIONS OF APPROVAL, IF ANY;
.BY ORDER OF THE CO~dtt~lOSlON
See Instructions On Reverse Side
DATE .....
Approve~ Copy
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources COmpany ·
SOHIO,-BPALASKA PRODUCTION DIVISION
TO:
I'"
it-co ¢.M
3111 "C"STR£E'¢~i RE5 :..
ANCHORAGE, ALAS (A
MAIL: POUCH 6-61~---)-4
ANCHORAGE, ALASKA ~Sp~
, . ',~' 20,.O~
Unit/P&P/Sna= =~/)
April 5, 1979[~,i
REFERENCE: Well Data Transmission
A-1
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:' ~'"/~
1 copy of the followin,.g Sohio opera'well pressure data:
Logs of the
/
Government Section Transient Survey/Packet
Il II II' II Il
II I! II I!
II II Il II
Transient Pressure & Spinner/Packet
" " /Packet
Diff. Temp?
Gamma Ray
Flowmeter
Fluid Density
Hydro Log
Spinner Log
Spinner Log
following Sohio operated wells:
Run 1 3/'1/79 & 3/8/79
Run 1
Run 1
Run 1
Run 1
Run 1
Run 1
2-9-79
2-7-79
3-4-79
3-2-79
2-3-79
3-19-79
./
· .
Colette Tracy
Well Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO: State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Dr.
Anchorage, AK 99504
Well Data Transmission
REFERENCE:
MAIL: POUCH 6-61
ANCHORAGE, ALASKA
-STATE
March 12, 197
The following material is being submitted herewith. Please acknowledge receipt by signing a ~,,~-'2_.," --.~
copy of this letter and returning it to this office'- ~
1 sepia and 1 print for the following Sohio operated wells:
/ B-2 Spinner Survey Run 1
/GC-3B Temp Log Dec. 6, 1978
,~ r...~t~.~ ( _/A-5 Transient Pressure Survey/Press-Temp Guage 2-15-79
iI~?''''' ' L '~ ~~--~--~~- Key Well Transient Survey/Data Packet 2-14-79
,~~,~ ~//~ rans~ent Pressure and Spinner Survey/Data Packet
2-26-79
~o±ette '±'racy
Well Records
DATE ' ~ 19
!
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
]Department of Natural Resourc.a,,,
r-...i."_'on o£ Oil & Cas
,.::.sb'~..~ orou..?'.!e
3111 "C" STREET
ANCHORAGE, ALASKA
TEL. EP~!DN~ '>~7' 2 ~-2.000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA'99502
DEV-PB-250/7
DEV-PB-250/6
DEV-PB-250/8
D~c~nl~r 13, 1978
REFERENCE: Well Data Transmission
copy of this letter and returning it to this office:--
'I-ogs for the 'following Sol/io Operated'wells:
B-9 CNL~DC-TVD Run 1 '5" & 2"
BHCS -TVD
DIL-TVD
FDC-TVD
J-5 ~NL
D-6 CNL
F,-1 ~ ~NL
GC-3A Eng. Prod. Log
A-4 " " "
D-5 Flowmeter
C-3 "
F-7 spinner
Run 1,2
Run 1,2
Runl
Run3
Run3
Run2-
Runl
Runl
Runl
I!
I!
!!
I!
1!
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
& 2"
& 2"
& 2"
C-7 J Transient Pressure Survey 9-23-78 ~
A-4 / Transient Pressure Survey . 11-3-78, Enclos'!ng pressure build-up
survey, field data, graph, data sheet
~ ~~--.:-.-. -,~ : . ,,;fi! ~-'--:';-~.=_.~,-,~,-,~:' ~.~.'! ", ~-.-'. -
Well Records/' ~ t '\;' [2 D
{,\ L \.. i~ i V L
? DEC 1 5 1978
........................................................................................... i ........................... A',:t~! }_~.~!age~ .....................
R~i-Kwik, Quality Litho
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Division of Oil & Gas Conservation
Department of Natural Resources
3001 Porcupine Dr.
Anchorage, AK 99504
Attn: Mr. H. Hamilton
3111 "C" STRI: ET
ANCHORAGE, AL ASI~A'5 ~N~', ~.
MAIL: POUCH ~-612 3
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Transient Pressure Surveys for the following wells - enclosing
Pressure Gradient Survey Data, Pressure Gradient Survey Graph, Pressure
Build-up Surv~) Field Data, Pressure and Temperature
A-3, A-5, (A-~ B-2, B-3A, B'8, C-2,(2) C-3, H-8, J-6, N-1
Governmental Section Well Transient Survey with the above enclosures
for well M-3
Colette Tracy
Well Records
DATE /5//?/7~ 19'
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, AK 99502
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
September 22, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Government Sectional Survey - J-3
.~ial Transi, ent Pressure
, C-6', ~'C 7"~! B-3A
Surveys
Key Well Transient
Surveys for
B-2q C-2',
for the following wells:
the following wells:
E.I., J-6~ H-8'
Colette Tracy
Well Records
RECEIVED
DATE 19 __
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP A L AS~"I~_U C,T I ~1~11~1 ~V I S I 0 N
TO: e of Alaska
~e~a~ment of Natural Resources
A i~D~~°n of Oil & Gas
3001 Porcupine Dr
Anchorage, AK 99502
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
DEV-PB-250/8
September 14, 1978
REFERENCE:
The ~llowing material is ~ing submi~ herewith. Please acknowled~ receipt by signing a
_ y of this le~er and returning it to this office:-
A-7 Transient Pressure Survey
~ sepia and 1 print for the following Sohio Operated wells:
~t-6 TDT-M Runl 5"
TDT-M Run 1 5"
CNL Run 3 5"
BHCS Run 1,2,3 2" & 5"
Colette Tracy
Well Records
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO: State of Alaska
Department of Natural Resources
Division of Oil & Gas' Conservation
3001 Porcupine Drive
Anchorage, AK 99509
Attn: Mr. O. K. Gilbreth
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
9EV-PB-250/8
June 23, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
copies of the following..reports:
B-1 State Sundry Notice - Subsequent Report of Shoo'ting or Acidizing
N-8 State Sundry Notice - Subsequent Report of Shooting or Acidizing
B-4 State Sundry Notice - Intention to Shoot or Acidize
B-2
D-3
-3
Initial TransientPressure Survey ~
Key Well Initial Transient Pressure Survey
Static Pressure Survey
Static Pressure Survey
Key Well Static Pressure Survey
Key. Well Transient Surveys for the follOwing well:
-_ ,~_, ~,. ,~
Governmental Section Transient Pr.essure Surveys for the following wells:
F-l, F-2, F~3, FiS, F~6, F-7, F-8, G-l, N-5, N-6
sepia and 1 print for the following wells:
B-2 Spinner Surveys Run 1 5"
-~ Flowmeter Run 1 5"
.~CNL Run 1 5"
N-6 Temperature Log Run 1 5"
RECEIVED
DATE
SOhiO PETROLEUM COMPANY-
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
State of Alaska
~Division of Oil and Gas
3001 Porcupine Dr.
Anchorage,. Alaska 99504
Attn: O.K. Gilbreth
3111 "C" STREET .
ANCHORAGE, ALASKA
TELEPHONE (907)265-0000
MAIL: P.O. BOX4-1379
ANCHORAGE, ALASKA 99509
DEV-PB'250/8
June 1.2, 1978
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
Triplicate copies o'f Form 10-403, for 'the following wells:
B-I, B-2, N-8
1 sepia and 1 print for the following' wells:
A-2 CNL Run 1 5"
CNL Run 1 5"
CNL Run 1 5"
C-2 CNL Run 2 5"
C-5 CNL Run 2 5"
F-4 CNL Run 2 5"
H-8 Spinner/Diff/Temp 5"
RECEIVED
DATE
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention:
Mr. O. K. Gilbreth
Director
Cuj FiD NTIAL
3111 "C" STREET
ANCHORAGE, ALASKA
TEL EPHON E (907)265-0000
MAIL: P.O. BOX4-1379
ANCHORAGE, ALASKA 99509
March 15, 1978
Gentlemen:
Well A-7 (12-26-11-13)
Enclosed, in duplicate, is Form P-7, Completion Report for
the above-named well, together with the Well History.
Very truly yours,
S0~P. ETROLEUM COMPANY
?. R. Judd
District Drilling Engineer
PRJ: j a
Enclosures
cc: Well File #17
Colette Tracy
Form P--.7
' SUBMIT IN DUPLICATE*
$'rAT1: OF ALASKA (See other in-
structions on
OI/ AND GAS CONSERVATION coMMITTEE reverse side,
Il I
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
la, TYPE OF WELL: o'zl, ~-~ bAS
WELL WELL ~ bag [~ Other
b. TYPE OF COMPLETION: ..
NEW ~-~ WORK ["~ DEEr- ~'~ PLUG ~-'~ DIFF. ~-~
W E L L OV ER E N BACK RESVR. Other
2. NAME OF OPERATOR ·
Sohio Petroleum Co., Div. of Sohio Natural ResoUrces Company
'3. A~DRESS OF OPERATOR
P. O. Box 4-1379, Anchorage, Alaska 99509
~. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
At surface 922' WEL,1700' SNL, Sec. 35, TllN, R13E, UPM
At top prod. interval reported below
201' EWL,2624: NSL, Sec. 26, TllN, R13E, UPM
At total depth
206' EWL, 2725' NSL, Sec. 26 TllN, R13E, UPM
CONFIDENTIAL
API N~CAL CODE
50~029~20131
LEASE D~SIGNA~ON A/~D SERIAL NO.
ADL 28286
~. IF INDIA.H, ALLOTTEE OR TRIBE NAMII
8. UNIT,FA~RA{ OR LF~SE NA~IE
Prudhoe Bay. Unit
9. WhiLL NO.
A,,7 (112-26-11-13)
10. lrl~/.~D AND POOL; OR WILDCAT
Prudhoe Bay, prudhoe 0il
11. SEC., T., R., M., (BOTTOM HOL~
OBJECTIVE)
Sec. 26, TllN, R13E, UPM
12. PEH1VIIT ~O.
73-.41
1/13/74 ] 2/11/74 [ 3/2/78 I KBE 64.69" AMSL t 45.49' AMSL
18. TOTAL D~:l-'l'li, MD & TVD~9. P:LUG, BJkCK MD & ~D~0. ~r ~L'rm~ CO~L.. ' I 21. ' "'NTg.VALS~"rr,L~n .~
~ ~ ~ [ ~OW ~Y* ROTARY TOOLS ................. CABLE TOOI S
11899 ~ 9068 T~ ~1868 ~ 9043'~D ] None I ~ 'Total ~ '
'~ PRODUCING fNI~VAL(S) OF ~'S'C ' '
· ''' , . OM~'I'IO~, ~OM, N~E (~ AND ~)* ' ~. W~ DI~ON~
Tap: 11684' ~ 8878' TVD ~ SU~VE~
Prudhoe 0il Pool B;ottom: 11835' MD 9011' T~ .[ Yes
m. ~ m.~c~mc ~ OTa~ ~s av~ j
DIL/SP, BHCS/GR,. FDC/CNL/GR, ETT, CBL/GR
__
I" - ' ~ CASING RECORD (Report all strings set in well)
_ wrmaT, LB/rE, 1~ ~romE ] D~.. ~ (m~, I SOLE s~zz ! cm~-~ rxcor~
. 9 5/8"., 47#; ' .~ N-80 ~2107-16562'/ 12 1/47 2275 sks
'9 5/8;~10 3/~'[47#/55'5~ N-80 [ 2118~'29# }[_N-80 [10028-~189~[~ieback +ith 3 jim. 9 5/8"xll )/~"~hermocase Li~8,1/2~. ' 850 sks
26. LINER ~CO~ [ 27. TUB~G
:{?11709,'.11716t ,, u ' 2/12/74
.:~' :11766"-11796' " ' " "
:~11810'-11835" " . ,, ,.,
PRODU6-PION
~ (MD) SIZE ' [ DEPTH SET (MD) I PACKER SET (MD)
7"': [ 10053 ~ .... i
~CID, SHOT, F~'U~, C~:NT SQU~ZE, ~C.
11897 t, [ 100 sks: Class- U'GU: cement
I
FIRST P~ODUCTION i FRODUCTION METHO.D (Flowh~g, gas lift, pumping--size and type of pump) WELL STATUS (Producing or
or T'-ST. [ttoLras TESTED .: lcaloxE SIZE IPROD'N FOR
. 1 ' 'F I ' u c
D~SPOSlTION or ols (8o~, ~$eg 1or ~el, venteg, e~e.)
o~'
LIST ATTACHMENTS ..
Well History D:¥18,~Otl 01 0~i
33. I hereb~ certff~~~ed information is complete and correct as determined from all:
,m~,.~~~~i ,:l:lFd ' TIT'' Diatrtct Drilling Engineer
*(See Instructions and S~ce, For Additional Data on Reverse Side)
INSTRUCTIONS
General: This form is designed for submitting a complete and correct ,.,veil completion report end to9 on
all types of lanJs and leases in Alaska.
Item: 16:. Indicate which elevation is used as reference (where not otherwise shown) for depth measure-
ments given in cther spaces on this form and in any
Items 20, and 22:: If this well is completed for separate production from more than one :nterval zone
(multiple completion), so state ~n item 20, and ir~ item 22 show the p,c:J~c:r'~9 interval, or
top(s), bottom(s) and name (s) (if any) for only the interv.~! ref.~orted in item 30 Submit a separate report
(page) on this form, adequately identified, for each additior~a! ir~te~ val to be seperately produce.d, show-
ing the ackiitional data pertinent to such interval.
Ite~m2&: "Sacks Cement": Attached supplemental records for this well shouIJ show the details of ~ny mul-
tiple stage cementing and the location of the cementing tool.
Itom 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
34. SUMMARY O~' IOORMATION TE. STS INt'LUI)IN(; INTERVAL TF~qTED. PI~E~qURE DATA ~ ~COVERI~ OF OIL GAS,
35. G~GIC MARK~
WAT~ AND MUD
NAM~
BKB. Subsea
Sag R~uer 11512 ~ 8667
Shubl~k 115~6 8695
Sadleroch~t 11637 ~: 8773
.
WELL HISTORY
CO? FJDENTJAL
BP WELL NO. A~7 (12~26~--11~13)
DRILLING
January, 1974
Spud well at 1600 hours, January. 13, 1974, Drilled 18 1/2" hole to 2740~, Ran
30 jts. of 72# amd 39 its. of 68# 13 3/8" N~80 Buttress casing with shoe at 2698':
with 1 1/4" tubing strapped to the 13 3/8" casing from s.urface to 1837~. Cemented
with 3250 sks Arcticset and displaced with 41 bbls water.. Circulated out 50 bbls
cement at surface. Tested BOP"S, R1H, drilled float and shoe and tested shoe bond
to 500 psi. Directionally drilled and surveyed to 10566~, dropped multishot survey
and POH. Ran 216 jts. of 9 5/8" 47# N-80 Buttress casing liner with shoe set at 10562'·
and the top of PBR 2107'. Mixed and pumped 45 bbls of HOwco mUd flush, 1500 sks of
Halliburton Light, and 200 sks of Class '"G". Lost complete returns with 340 bbls of ~.:.
displacement away out of 647 bbls total displacement. Preparing for second stage
cementing.
February, 1974
Opened lower F.O. cementer. Mixed and pumped 30 bbls mud flush followed by 175 Sks "
Howcolite and 200 sks Class. "G". Displaced with 73 bbls mud, Closed lower F. O.
cementer. Opened middle F. O. cementer and circulated, Batch mixed 200 sks permafrost
II, displaced with 46 bbls mud, and closed F. O, cementer, Drilled cement plug
from 10200~ to 10477', drilled catcher sub and landing collar, tested casing to
3500 psi. ~~rr~~osu~.a__n~.~TT log, Drilled and surveyed to 11899",
Ran 48 jts. of 7" 29# N-80 Buttress casing and s-et shoe at 11894? Cemented with
850 sks Class "G" and displaced with 243 bbls mud, reversing out excess cement.
Tested 7" x 9 5/8" lap to 1000 psi. Tested 9 5/8" casing to 2650 Psi above 3000".
Displaced top 2500" of well to diesel. Released rig fromA~7 at 0200 hours, February
16, 1974.
COMPLETION
Accepted rig 1830 hours, 9/8/77. Installed and tested BOPE, Ran 2 jts. 9 5/8" 47#
controlled-yield N~80 Butt~ress casing ~ith ·9 5¢'-. FOE:. hatwe.en~ 48 jts,. 10 3/4!!..55 5#
controlled-yield N-80 Buttress casing and 3 its,. 9 5/8" x 11 3/4"~ Thermocase ll
and landed at 2108'~. Arctic Packed 9 5/8" x 13 3/8" annulus, Displaced well to
CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay, Ran CBL log under pressure~
Drilled out 7" shoe. Set retainer at 11868~' and squeezed shoe with 100 sks Class "G"
cement. Ran 255 jts. 7" 26# controlled-yield N-80 AB~IJq4S tubing stabbed into PBR
at 10019'. Ball valve nipple at 2006'·. Displaced tubing to diesel, Tested tubing to
3500 psi. Installed and tested Xmas tree. Released rig at 2400 hours, 9/19/77~
PERFORATING
March~ 1.9.7.8
Pressure tested tubing to 3000 ps'ig and the inner annulus to 1500 psig,
Perforated the following intervals using Schlumberger 4~ carrier guns Hyper Jet II~ 4 S,P.F.
11,684 - 11,699 ft,. BKB (ref.~ BHCS/GR (2~12~74l
11,709 - 11,716 ft. BKB~. (?el, BHCS/GR (j2v12m74)~
11,726 - 11,756 ft.. BKB (~ef, BHCS/GR (2~12~74)
11,766 - 11~·796 ft. BKB. (ref.. BHCS/GR~ (2~12~74)
11,810- 11,835 ft. BKB (ref. BHCS/GR (2-%2-74)
CONi:iD[N i IAL
Immediately following perforation operations a static bottom~hole pressure survey
was recorded.
Ran and set I.S. and SSSV. Tested SSSV, swab valve, master valve, END OF OPERATIONS.
The Well was left with the SSSV closed and with the well headvalves:~°se--d~ [except
the surface safety valve),
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907)265-0000
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99509
ATTENTION: Mr. O.K. Gilbreth, Jr.
Gentlemen:
A-1 (42-35-11-13)
A-2 (41-36-1'1-13)
A-3 (43-27-11-13)
A-5 (43-34-11-13)
March. 7, 1978
MAIL: P. O. BOX 4-1379
ANCHORAGE, ALASK/~ i~§i3, O~ -~T.~'~-~.
3 Z Ff'~L
~_'"
.. .:
2-26-11-13)
2-36-11-13)
H-6 (21-11-13) --
GC-2B (16-11-13)
·
D-5 (23-24-11,13R)
Enclosed please find in triplicate form 10-403, 'SUndry Notices and
Reports on Wells, and in duplicate form P-4, Monthly Report of
Drilling and Workover Operations, for the above Wells.
VerY' trulY yours, '
/
iroleum COmpany
G. D. T ,.,.
Manager-~d Op ~ a~
GP :bs
Enclosures
cc: P.E. Well 'files
Drilling well files
A-7 (12-26-11-13)
Form ! 0-403
REV. 1-10-73
Submit "Intentions" in Triplicate
& '.'Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
2. NAME OF OPERATOR SOHIO PETROLEUM COMPANY
A DIVISION OF SOHIO NATURAL RESOURCES COMPANY
3. ADDRESS OF OPERATOR
P.O. Box 4-1379, Anchorage, Alaska 99509
4. LOCATION OF WELL
At Su trace
2525' SNL, 198' WEL, SEC. 26, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 64.69' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TO:
5. APl NUMERICAL CODE
50-029-20181
6. LEASE DESIGNATION AND SERIAl NO.
ADL 28286
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
PRUDHOE BAY UNIT WEST
9. WELL NO.
A-7 (12-26-11-13)
10. FIELD AND POOL, OR WILDCAT
PRUDHOE BAY, PRUDHOE OIL pOoL
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
SEC 26, TllN, R13E, UPM
12. PERMIT NO.
73-41
)orr, or Other Data
SUBSE(~UENT REPORT OF:
FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING
SHOOT OR ACIDIZE ABANDON* SHOOTING OR ACIDIZING ABANDONMENT*
REPAIR WELL CHANGE PLANS (Other)
, (Other) (NOTE-' Report results of multiple completion on Well
COmlHetlon Or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letalls, and give pertinent dates, including estimated date of
starting any proposed work.
The following intervals in this well were perforated (at 4 S.P.F.) for production:
11,684 - 11,699 ft. BKB (ref. BHCS/GR 2-12-74)
11,709 - 11,716 ft. BKB (ref. BHCS/GR 2-12-74)
11,726 - 11,756 ft. BKB (ref. BHCS/GR 2-12-74)
11,766 - 11,796 ft. BKB (ref. BHCS/GR 2-12-74)
11,810 - 11,835 ft. BKB (ref. BHCS/GR 2-12-74)
A static bottom-hole temperature survey was conducted prior to perforating.
Immediately following the perforation operations, a static bottom-hole pressure
survey was recorded. The well was left. with a SSSV in the nipple at CA. 2000 ft. BKB.
(This space for Sta't~ office use)
TITLE
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY;
TITLE
DATE
See Instructions On Reverse Side
A-7 12-26-11-13
Form No. P-4
REV. 3- 1-70
~,~¢~ SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE ·
50-029-20181
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28286
1. OIL ~ GA~ 1~ 7. IF INDIAN'ALOTTEE OR TRIBE NAME
WELL~3~ WELLI I OTHER
2. NAME OF OPERATOR SOHIO PETROLEUM COMPANY
A DIVISION OF SOHIO NATURAL RESOURCES
3. ADDRESS OF OPERATOR
P.O. Box 4-1379, Anchorage~ Alaska
4. LOCATION OF WELL
99509
2525' SNL, 198' WEL, SEC. 26, TllN, R13E, UPM
8. UNIT FARM OR LEASE NAME
PRUDHOE BAY UNIT WEST
9. WELL NO.
A-7 (12-26-11-13)
10. FIELD AND POOL, OR WILDCAT
PRUDHOE BAY.. PRUDHOE OIL POOL
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
SEC. 26, TllN, R13E, UPM
12. PERMIT NO.
79-41
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
1/2 March 1978 Pressure tested tubing to 3000 psig and the inner annulus to
1500 ps±g.
Perforated the following intervals using Schlumberger 4" carrier'
guns Hyper Jet II, 4 S.P.F.
11,684
11,709
11,726
11,766
11,810
- 11,699 ft. BKB (ref. BHCS/GR 2-12-74)
- 11,716 ft. BKB (ref. BHCS/GR 2-12-74)
- 11,756 ft. BKB (ref. BHCS/GR 2-12'74)
- 11,796 ft. BKB (ref. BHCS/GR 2-12-74)
- 11,835 ft. BKB (ref. BHCS/GR 2-12-74)
Immediately following perforation operations a static
bottom-hole pressure survey was recorded.
6 March 1978
Ran and set
valve. END
SSSV closed
the surface
I.S. and SSSV. Tested SSSV, swab valve, master
OF OPERATIONS. The well was left with the
and with the well head valves closed (except
safety valve).
14. I he~*by ce~y that', fore~i~is ~u, and con~t '
S IGNED~~¢~ TITLE ~ W~ ~.~ DATE
oil and ~a ~on$~r~ation ~ommitt~ by th~ lBth o~ the au~din~ month,unl~ otherwise dir~t~.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
3111 "C" STREET
ANCHORAGE, ALASKA
SOHIO-BP ALASKA PRODUCTION DIVISION
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O.K. Gilbreth
Subject: ~12-26-11-13)
~ (22-36-11-13)
Gentlemen:
February 1, 1978
TE LEPHON E (907)265-0000
MAIL: P. O. BOX 4-1379
ANCHORAGE, ALASKA 99509
.
,
'
___
Enclosed please find in triplicate form 10-403, Sundry Notices and Reports on
Wells, for the above wells.
Very Truly yours,
Sohio Petroleum Company
Manager Operations
Enclosures
cc: P.~. well file A7
A8
Drilling well file A7
A8
i978
Form 10-403
REV. 1-10-73
Submit *'Intentions" in Triplicate
& "Subsequent Reports" In Duplicate
STAT E ~'~ ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Oo not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposa!s.)
gGAS g
1. OWL%L WELL OTHER
2. NAME OF OPERATOR
.q~hin p~fr~l~n: A Divi.~ion of Sohio Natural Resources
3. ADDRESS OF OPERATOR CiD.
· P.O. Box 4-1379, Anchorage. Alaska 99509
4. LOCATION OF WELL
At surface
2525' SNL, 198" WEL, Sec. 26, TllN, R13E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 64.69' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-029-20131
6. 'LEASE DESIGNATION AND SERIAL NO.
ADL 28286 .
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit W~st
9. WELL NO.
A-7 (12-26-11-13)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Pru.dhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 26, TllN, R13E, UPM
12. PERMIT NO.
73-41
3ort, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR AC~OIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF E~ REPAIRING WELL
FRACTURE TREATMENT~ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all Pertinent detall~, and give pertinent dates, Including estimated date of
starting any proposed work.
The following intervals in this well will be perforated (at 4 s.po ;f.) for
production:
Zone 4 11684 - 11699 ft. BKB (15') (ref. BHCS/GR 2-12-74)
Zone 4 11709 - 11716 ft. BKB (7 ') (ref. BHCS/GR 2-12-74)
Zone 4 11726 - 11756 ft. BKB (30') (ref. BHCS/GR 2-12-74)
Zone 4 11766 - 11796 ft. BKB (30') (ref. BHCS/GR 2-12-74)
Zone 4 11810 - 11835 ft. BKB (25') (ref. BHCS/GR 2-12-74)
170
A static bottom-hole t~nperature survey will be conducted prior to perforating.
~iately following the perforation operations, a static bottom-hole pressure
survey will be recorded and the well will be back flowed to clean up. The well
will be left with a SSSV in the nipple at ca. 2000' BKB.
RECEIVED
16. I hereby certify that the foregoing is true and correct
(This space for State office use)
CONDITIONS OF APPROVAL, IF A~':
D!vision oi Oil and Gas Cans~rv~tion
TITLE Petroleum En§ineer
See Instructions On-Reverse Sid~
DATE February 15, 1978
BPALASKA INC.
3111 - C - STREET · TELEPHONE {907) 279-0644
CONFIDENTIAL
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
October 6, 1977
State of Alaska
Department of Natural Resources
Division of Oil & Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
BP Well No. A-7 (12-26-11-13)
Enclosed, in duplicate, is Form P7, Well Completion Report for
the above-named well together with the Well History. Th~S well
has been suspended pending perforation. ~
Very truly yours,
District Drilling Engineer
PRJ:ja
Enclosures
cc: Well File #17
Regina McGaffigan
OCT 1 11977'
D!visio. ~f Oil
Form P---7
SUBMIT
STAT$: OF ALASKA ' : (see other in-
st ructions on
OIL AND GAS CONSERVATION COMMITTEE reve,'se
i i i
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
ii
WELL WELL
b. TYPE OF COMPLETION:
.~EW [~ WORK ~]
WELL OVER
NAME OF OP~RATOa
BP
Alaska, Inc.
3. A~Da~ss oF OPER^TO~ "
EN BACK RESVR.
·
_ ,,,, i ,1 uJ i 11 ,,,
P. 0. Box 4-1379, Anchorage, Alaska 99509
4. LOCA~ION OF WELL (Report location clearl~l and in accordance with any ~tate requirements)*
xt~u~ac~ 922' WEL, 1700' SNL, Sec. 35, T11N, R13E, UPM
At top prod. interval reported below Sa~ ~SST
198' EkrL, 2535' NSL, Sec. 26, TllN, R13E, UPM
At total depth
206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM
APl NU'MFA~ CODE
50-029-20131
LEASE DESIGNATION A.ND SEI~I~I., NO.
ADL 28286
?. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT,FArM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
A-7 (12-26-11-13)
10. FIELD A2q'D POOL; OR WII-A3CAT
Prudhoe Bay,Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec. 26, TllN, R13E, UPM
12. PERIVIIT NO.
73-41
ls. DATE SPUDDED [14': DATE
1/13/74[ 2/11/74 [ 9/19/77
lS. T~AL D~, ~ & TVD~9. PLUG, ~CK MD ~ WD~. ~ ~L~LE CO~., { 21.
11899' ~ 9068' TVD[11868' ~ 90~3'T~] ~ow~, None i ~o~, ~oo~ Total
~. PRODUCING I~VAL(S), OF ~IS COM~I~, BO~OM. N~E (~ ~ ~)*
None
~. ~E ELECTRIC ~D
DIL/SP, BHCS/GR, FDC/CNL/GR, ETT, CBL/GR
~ ' . .CAM~G ~ (Re~ all strips set in w~ll)
· CAS~G SIZE ] WEIGh, LB)~.~ G~E i D~'~. (~)
/N-SO [
{.-so {
9-5/8"/~0-3/4"
26. LINER ~CO~
~. ~E~ORATIONS ~P~ TO PRO~O~ ~ ([n~rv~, ~ze ~d number)
~one. Shoe
DATE FIRST P~ODUC~ON [ ~DUCTION METHOD (Flowh~.g, gas Iii. t, pump~--size and type of p~p)
O~TZ 0F TZST, ~O~S T~ ~]~OI{E SIZE [~OD'N FO~ OI~BBL. G~CF.
I 'F
31. DISPOSITION Or OaS (Sold, ~,ed for fuel, vented', etc.) ~ I ,
i 1~: ~I~VATIONS (DF, RKB, RT, GR, ~UC)* [ 17. EL2gV. CASINGHEAD
KBE 64.69' AMSL 45.49' AMSL
, ~_
~;NTERVALS DRILLED BY
'! CABLE TOOLS
23. WAS DIRECTIO.NAL
! SURVE~ ~ADE
~ Yes
.I
~'.1 hereb' cert,y~r;~~ information ,. com.lete and corre., as determined 'r~'~,~,',~able records, ,
SIGNED TITLE District Drilling Engineer DATE
: *(See Instructions and S~ces [or Additional Data on Reverse Side)
DElYCI-I INT]~RVAL (MD) ~u~OUNT ~'~ND K/ND O!F 1VIA. T~EP~IAL USED
squeeze 11897' 100 sks Class G cement
W-ELL STATUS (Producing or
shut-in).
WA~BB~. [ GAS-OLL r~A.TIO
zo~18½.s~z~. [[ 3250 sksCm~w~NG RECOI~D { ~O~-T PUL~
{ 227s sks
tieb~ck8~,, [~ith8503sks~tS' 9-5/8" x 1173 ,4," ThermocaseII
27. TUB~G
S~ (MD) SIZE D~ SC (MD) [PACK~ SET (~)
7" 10053' ' {,
~. ~CID, SHOT, FT~CTU~,
INSTRUCTIONS
General: This form is designed for submitting a complete arid correct well cornplet~or~ report e~d log
all types of lanJs and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise showr~) for depth measure-
merits given in cther spaces on this form and in any a~tacF~?-~er~ts
Items 20,'and 22:: tf this well is completed for separatc prcduction from more than one interval zone
(multiple completion), so state ~n item 20, and i~ item 22 show the prcJuci~3 interval, or i~tervals,
top(s), bottom(s) and name (s) (if any) for only the interva! ret~orted in item 30 Submit a separate report
(page) on this form, adequately identified, for each additior~al interval to be seperatety produce.J, show-
ing the additional data pertinent to such interval.
Item26: "Sacks Cement": Attached supplemental records for this well shoutJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
,
34. SUMM'AI{¥ OF FORMATION T~Z.~'I'S IN('LUDIN(; INTERVAL TESTED. t-'HI~.~SURE DATA ~ ~COVERIF~S OF OIL. GAS,
35. G~GIC MARK~
WAT~ AND MUD
M~s fi~ ~u~ v~.'"6~
i i, ,i i , ', i ~ ..., ¥,-n, .r
BKB Subse~
Sag R~ve: Z~SZ2' 8667 '
ShubZ~k 1~546 ' 8695 '
Sad~eroch~t 1Z6~7 ' 877~ '
~. C~OIIE DATA. Aq'I'ACII BRIKF :D~C~I~ONS OF LITi[OLOGY. POR~ITY. F[~AC~R~. A~NT ~$
ii i i i i i i
BP Well No. A-7 (12-26-11-13)-
WELL HISTORY
DRILLING
January, .1974
Spud well at 1600 hours, January 13, 1974. Drilled 18-1/2" hole to 2740'. Ran
30 jts. of 72# and 39 jts. of 68# 13-3/8" N-80 Buttress casing with shoe at
2698' with 1-1/4" tubing'strapped to the 13-3/8" casing from surface to 1837'.
Cemented with 3250 sks Arcticset and displaced with 41 bbls. water. Circulated
out 50 bbls. cement at surface. Tested BOP's. RIH, drilled float and shoe and
tested shoe bond to 500 psi. *Directionally drilled and surveyed to 10566',
dropped multishot survey and POH. Ran 216 jts. of 9-5/8" 47# N-80 Buttress
casing liner with shoe' set at '10562' and the top of PBR 2107'. Mixed and pumped
45 bbls. of Howco mUd flush, 1500 sks of Halliburton Light, and 200 sks of Class
"G". Lost .complete returns with 340 bbls.~of displacement away out of 647 bbls.
total displacement. Preparing for second stage cementing.
February~ 1974
Opened lower F.O. cementer. Mixed and pumped 30.bbls. mud flush followed by 175
· sks Howcolite and 200 sks Class "G". .Displaced with 73 barrels mud. Closed ·
lower F.O. cementer. Opened middle F.'O. cementer and circulated. Batch mixed 200
sks Parmafrost II, displaced with 46 barrels mud,. and closed F.O. cementer. Drilled
cement'plug from 10200' to 10477', drilled catcher sub and landing collar, tested
casing to 3500 psi. Ran Sperry Sun gyro survey and ETT log. Drilled and surveyed
to 11899'. Ran 48 jts. of 7" 29# N-80 Buttress casing and set shoe at 11894'.
Cemented with 850 sks C~ass "G" and displaced with 243 barrels mud, reversing out
excess Cement. Tested 7" x 9-5/8" lap to 1000 psi. Tested 9-5/8" casing to 2650
psi above 3000'. Displaced top 2500''of well to diesel. Released rig from A-7 at
0200 hours, February 16, 1974.
COMPLETION
Accepted rig.1830 hours, 9/8/77. Installed and tested BOPE. Ran 2 jts. 9~5/8''
47# controlled-yield Buttress casing with 9-5/8" FOC between, 48 jts. 10-3/4"
55.5# controlled-yield N-80 Buttress casing and 3 jts..9-5/8" x 11-3/4" Thermocase
II and landed at 2108'. Arctic Packed 9-5/8" x 13-3/8" annulus. Displaced~well
to CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay. Ran CBL log under
pressure. Drilled out 7" shoe. Set retainer at 11868' and squeezed shoe with 100
sks Class G cement. Ran 255 jts. 7" 26# controlled-yield N-80 AB-IJ-4S tubing
stabbed into PBR at 10019'. Ball valve nipple at 2006'. Displaced tubing to
diesel. Tested tubing to 3500 psi. Installed and tested Xmas tree. Released rig
at 2400 hours, 9/19/77.
OCT I ! 1977
Anchor??
bpal.aska inc. ,
311 I - C - STREET TELEPHONE (907) 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
Gentlemen:
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
BP Well No. A-7 (12-26-11-13)
Enclosed, in duplicate, is Form P-4, Monthly Report of Drilling
and Workover Operations for the above-named well for the month
of September, 1977.
PRJ:ja
Enclosures
cc: Well File #17
Very truly yours,
BP ALASKA, INC.
District Drilling Engineer
RECEIVED
OCT - 4
~,l'!,ch,-
l~orm 'No, P--4
R.~'V. ~- I-?0"
OIL AND GAS CONSERVATION COMMI~EE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
SUBMIT l~ E~PLICAT~
1.
WgLL
2. NA.M~ OF OP~KATO~
BP Alaskn, Ina.
~ ~SD~sbr'o~?o~ . ' '
P. O. 5ox ~-1379, Anchorage, Alaska 99509
4. LOCA~ON ~r w~
At surface:
922'WEL,
1700' SNL, Sec. 35, TllN, R13E, UPM
CONFiDENTiAL
50-029-20131
LEASZ DESIGNATION AND S~IAL NO.
ADL 28286
Prudhoe Bay Unit
%vR~ NO '
Prudhoe Bay, Prudhoe 0il Pool
o~
Sec. 26, TllN, R13E, UPM
12 P~IT ~O~
73-41
13. REPORT TOTAL DEPTH AT F2qD OF MONTH, CHA~NGES IN HOLE SIZE, CASING AND C~MF~NTING JOBS INCLUDING DEPTH
SET AD VOL~ US~, P~O~TIONS, ~TS ~ ~SUL~ FISHING JO~ J~K ~ MO~ AND SIDE-~ACK~ HO~
~D ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~ITIONS
September, 1977
Accepted rig 1830 hours, 9/8/77. Installed and tested BOPE. Ran 2 jts. 9-5/8"
47# controlled-yield N-80 Buttress casing with 9-5/8" F.O.C. between, 48 its.
10-3/4" 55.5# controlled-yield N-80 Mod. AB Buttress casing, and 3 jts. 9-5/8" x
11-3/4" Thermocase II and landed at 2108'. Arctic Packed 9-5/8" x 13-3/8" annulus.
Displaced well to CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay. Ran
CBL log under pressure. Drilled out 7" shoe. Set retainer at 11868' and squeezed
100 sks. Class G. cement. Ran 255 its. 7" 26# controlled-yield N-80 AB-IJ-4S tubing,
stabbed into PBR at 10019'. Ball valve nipple at 2006'. Displaced tubing to diesel.
Tested tubing to 3500 psi. Installed and tested Xmas tree. Released rig at 2400
hours, 9/19/77.
RECEIVED
OCT - 4 1 77
, i ;; .,,,Li ,_ , ~ ~ :, ~;;',,'", .....
NOT[ --Report on t~is f~ i~ required for .~ oolendar ~th~ regordless of the status of operatio~, and musf ~ filed In duplieafe wlt~ the ell end gas gonservet~n eommlHee hyt~e 18~ of the euoe~ding ~n~. ~le~ otherwise directed.
BP ALASKA INC.
31 1 1 - C - STREET · TELEPHONE (907) 279-0644
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas Conservation
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. O. K. Gilbreth
Director
MAILING ADDRESS:
P.O. BOX 4-1379
ANCHORAGE, ALASKA 99509
August 11, 1977
Gentlemen:
BP Well Number A-7 (12-26-11-13)
Enclosed, in triplicate, is Form 10-403, Sundry Notice and Report on
Wells for the above named well. This report contains our proposal
to complete the well in preparation for production.
RBV/ja
Enclosures
Ve~truly yours,
~SKA, ~NC.
Drilling Sup~rintendlnt
RECEIVED
AU6 1 5 1977
Division of Oil ~'
8!.0 G~8 Conservation
Anchorage
Form 10-403
REV. 1-10-73
Submit "1 ntentions' In Triplicate
& "Subsequent Reports" in DbPlicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
NAME OF OPERATOR
BP Alaska, Inc.
ADORE-SS OF OPERATOR
5. APl NUMERICAL CODE
50-029-20121
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28286
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. WELL NO.
P.O. Box 4-1379, Anchorage, Alaska 99509 A-7 (12-26-11-13)
4. LOCATION OF WELL 10. FIELD AND POOL, OR WILDCAT
At surface Prudhoe Bay, Prudhoe Oil Pool
922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE = 64.69'AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
Sec. 26, TllN, R13E, UPM
12. PERMIT NO.
73-41
)orr, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF [~ PULL OR ALTER CASING
FRACTURE TREAT ~ MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Complete
SUBSEQUENT REPORT OF:
WATER SHUT-OFF REPAI RING WELL
FRACTURE TREATMENT ALTER I NG CAS lNG
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE:= RePort resUlts of multiple completion on Well
COml:Hetlon or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letalls, and give pertinent dates, including estimated date of
starting any proposed work,
We propose to enter this well approximately Sept. 15, 1977, to complete the well
in preparation for production from the Prudhoe Oil Pool as per the following program:
1. Tie back 9 5/8" PBR to surface using new 10 3/4" 55.5# CY N-80 casing with three
joints of 11 3/4" X 9 5/8" thermocase on top. Arctic Pack Annulus.
2. Test 7" liner lap and change well over to CaC12 Brine.
3. Complete well with seal mandrel in 7" PBR on 7" 26# L-80 Tubing.
safety valve, with dual control lines, will be placed at 2000'5.
A subsurface
4. Change tubing over to diesel, install and test Xmas tree..
5. Suspend well for perforating subsequent to rig release, detailing of proposed
perforations to be submitted by Sundry Notice to follow.
Completion is in accordance with approval granted in letter of July 20, 1976,
utilizing 13'3/8" 68# controlled-yield N-80 Buttress casing.
CONDITIONS OF APPROVAL, IF AN~: /
TITLE _ D.rilling Superintendent DATE
TITLE Petroleum Enqineer
See Instructions On Reverse.Side
DATE 8/16/77
/
Division of Oil and Gas /
3001 Porcupine Drive, AnchOrage, Alaska 99501 !
JAY S. HAMMOND,
July 20, 1976
G. D. Taylor
Manager Operations
BP Alaska, Inc.
P. O. Box 4-1379
Anchorage, Alaska 99509
Re' Casing Design in the
Permafrost Interval
Dear Mr. Taylor'
Your letter of June 28, 1976, stated that five of your Prudhoe Bay wells
had 13 3/8" surface casing strings through the p~rost which included
68 lb/ft,N-80 buttress casing. These wells ar A~_~C~ C-5, C-6' C-7 and
C-8. Based on your studies you submit that 13 3-/~T", 68 lb/ft, N-
8O
buttress casing satisfies Rule 3(c) of Conservation Orders No. 98A,
No. 98B, and No. 83C.
The above Rule 3(c) states that surface casing through the permafrost shall
have minimum post-yield strain properties of 0.9% in ten'sion and 1.26% in
compression. Arco's May 1975 report, "Prudhoe Bay Field Permafrost Casing·
and Well Design for Thaw Subsidence Protection", describes results of full..
scale strain limit tests on 13 3/8", 72 lb/ft, modified N-80 (~.lN-80)
buttress casing and' of a finite element model calibrated from the tests.
Results of Arco's tests and studies indicated 13 3/8", 72 lb/ft, MN-80
buttress casing exceeded requirements of Rule 3(c).~ ·
One of the prime reasons that controlled yield or modified MN-80 casing
was specified in the Arco tests, was to preclude the practice of manufac-
turer's substitution For N-80, with higher steel grades which, due to
I~tlysical p'rol)er~ies, ·Fail in Arctic ai~plications. ThereFore, apl~roval
oF N-~O grade casing 'For sur[ace casiI~g Lhrougt~ the perlna[ros~ requires
assurance that other grades 'have not been substituted for N-80.
"1776-A llilltUll:. FIIOM OUl:i $1A IE 70 OlJll NA lION. 1976"
G. I). layl~r
~. }~. Hamilton
-?- -~'~ July 20, 1076
Your studies LISin.(} Arco's finite element mocl61 denlonstrated that failure
strain in compression for 13 3/8" 68 lb/ft, MN-~O buttress casing was
4.2%. Results of finite model calculations shown in Table III-1 of the
above mentioned Arco report alludes that failure strain in tension for
the same casin~] exceeds that of 13 3/F~', 72 lb/ft, ~qH-~O buttress casing.
O~r analysis supports this point. Based on these studies, 13 3/8", 68 lb/ft,
~lN-80 buttress casing adequately meets the requirements of P, ule 3(c) of
Conservation Orders No. 98A, No. 98B, and Ho. 83C.
Sincerely,
Hoyle H. Hamilton
Acting Director
BP ALASKA INC.
CONFIDENTIAL
P.O. BOX 4-1379
3111 -C-STREET
ANCHORAGE, ALASKA 99503
TELEPHONE (907) 279-0644
March 18, 1974
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell,
Director
Gent lemen:
Number BP A-7 (26-11-13)
Enclosed, in duplicate, is Form P-7, the Completion Report on
the above well, together with Well Logs, Well History, and
Magnetic Directional Survey. The Gyroscopic Directional iSurvey
will be submitted when available.
lpb
enclosures
cc: Operations Coordinator, New York
Well A-7 #17
Miss D. K. Gudgel
ery truly yours,
NC.
A. K. Howard
Manager Operations
I974
l:orm P--7
STATE OF ALASKA <See other in-
structions on
reverse side~
OIL AND GAS CONSERVATION COMMITTEE
i i i
WELL cOMPLETION OR RECOMPLETION REPO'RT AND LOG*
la. TYPE OF WI~LL: on, [~ ~;AS [-~
WELL WELL DRY [---] Other
b. TYPE OF COMPLETION':
.WEW [] wonK [ DEEP- [] PLUO [ DIFf. []
WELL OVER EN BACK EESVR. Other
2. NAME OF OPERATOR
BP ALASKA INC.
, m
3. ADDREI{S OF OPERATOR
P. 0. Box 4-1379, Anchorage, Alaska 99509
LOCATION OF WELL (Report location clearly and in accordance with any State requirements)
atBu~ace 922' WEL, 1700' SNL Sec. 35, T11N, R13E, U?M
At top prod. interval reported below
8730 T.V.D. Sag R SST 198' EWL, 2535' NSL, Sec. 26, TllN, R13E
At total depth UPM
9068 T.V.D. 206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM
CONFIDENTIAL
5. API NUMERICAL CODE
AP1 50-029-20131
6. LEASE DESIGNATION A-ND SERIAL NO.
/U)L 28286
7. IF INDIAN, AJ. JuO~ OR TRIBE NM
8. UNIT,FA-RiVI OR LEASE NAfvIE
[PUT RIVER
19. WELL NO.
~12-26-11-13)
'I'I~.~F~EI~D AND POOL, OR WILDCAT
PRUDHOE BAY, PRUDHOE 0IL
,
n. SEC.. T.. R.. ~.. ~mOTTO~ ZOLm POOL
OBJEC'rIVE)
Sec. 26, TllN, R13E, UPM
12. PEHA~IT ~O.
73-41
Jan, 13, 197~ Feb. 11, 1974| Feb. 16~ 1974 I KBE 64.69' AMSL ~i BFE 45.49 AMSL
18. TOTAL DEPTH, 1VLD & TVD~9. PLUG, B~CK MD & TVLJ~), IF ~LT~LE CO~L., 21. INTERVALS DRILLED BY
~) ~OW ~Y* HOTARY TOOLS % CABLE TOOLS
11,899 ~ (9068"~D~ 11,885 ~ (9055' Total
~. PRODUCING I~VAL(S), OF ~IS COM~IO~, BOSOM, N~E (~ AND ~)* ~. W~ DIRE~O.N~
~ SURV~ MADE
none
{ yes
24. TYPE ELECTRIC AND OTHER LOGS RUN
Schlumber~er~ DIL/S,P~ BHOS/GR~ FDC/CNL/GR~ ETT; CB,L/GR
CASING RECORD (Report all strings set in 'well)
CASiNG SIZE WEIGHT, LB/FT. DEPTH SET (1VLD) HOI_~ SIZE
13 3/8"
Clq.,%T~N'TING RECOi~D ! A~IOUNT PULLED
26. LINER I~EC Ol%D
q 5/8" 21 07 1~_562 I 27~75 .~.
7" i ~0028 t "1'1:S94 I 850 .~.
28. PERORATIONS OP~ ~ PRODU~ON (In~, size ~d number)
27.
SCREEN (MD) SIZE
TUBING
DEPTH SET (MD) [ PACKER SET (IVID)
29. ACID, Si~OT. FJLA~CI'i/HE, C'F.,'~IENT SQU~.~.ZV,, ETC.
DI~'-~T'I-I II~T]~iRVAL (MD)' A~WlOUNT ;d'qD KIND O,F MA;I~ER.IAL USED
30. PRODUCTION
DATE FIRST PIIODUCTION [ PRODUCTION MEII{O'D (Flowing, gas lift, pumping--size and tYP~%~]~f~N~I~0~4 ~,l'~ ~[ '~in~~{~[~S~T~S (~oduc~g or
~OW,~.WBING CA~G P~S~. ]~-HOUR ~[CAL~~ L'OI~BBL' [GA~' [ WA~B~. ~ OIL GRAVITY-~I (CO~.)
31. DISPOSITION OF OAS (~old, used for fuel, vented, etD.) ITgST WITNESSED BY
32. LIST OF ATTAC~I~NTS
Well History,~.We11 logs, Magnetic Directional Survey, Eastman Single Shot Survey,
INSTRUCTIONS
General: This form is designed for submitting a complete and correct v, el[ completion reF,_ort and !o9 on
alt types of lanJs and leases in Alaska.
item: 16: Indicate which elevation is used as reference (where not o:hervvise s¼o~..r'~! for depth measure-
merits given in ether spaces on this for,-,; and in any
Items :20, and 22:: If ti~is well is completed for separate prcc].~ction fro'z~ r~o,e th:in one i,terval zone
(multiple completion), so state ~n item 20, and in ite,~ 22 sho;., tht~ p,c:]~c :~!~ interval, or ~nte;v~ls,
top(s), bottom(s) and name (s) (if any) for only the interv.~! re[>orted ir~ item 30 S'ahr'-~,t a separate report
(paoe) on this form, adequately identified, for each add,t~or~al i~te~val to be seperately producerJ, show-
ing the ackJitional data pertinent to such interval.
Ite, m:26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item :28: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
~4. SUMMAI[Y ()[,~ FORMATION TgS'l'.'q IN('I_.UI)IN(; iN'I~'E[IVAI..'-- TF..c3'I'I;~I), t)HEL'q.c;UItE DATA AND~P.~COVERIF~S' ()F ()IL GA-q-
35 GEOLOGIC M A R K ~1~
~fAT~R AND MUD
~^~r~: B~B sub-sea
Sag River FM 11510 8664
(SHAL)
Shublik FM 11545 8694
Sadlerochit FM 11636 8772
.qtl. COIqE DATA, A'I'FAcIi BRIEF' i)ES~"I~I'~IT'I'o:Ns 'OF LIT[tOLOGY, PO.FI¢)Sl~TY, F[tACTUKF.,S, APPA. RIENT 'DI~PI~
.a/'Nl~ DE'DECTEI) $11OWS OF Olg. GAS Otl ~,VATE'tl.
~,~:,:
WELL HI STORY
WELL NUMBER A-7 (12-26-11-13)
Ja_._nuarx, _19~74:
13 - 19 Spudded well at 1600 hours, January 13, 1974. Drilled 18 1/2" hole to
2740'. Ran 30 joints of 72¢/ and 39 joints of 68f~ 13 3/8" N-80 Buttress
casing with shoe at 2698' with i 1/4" tubing strapped to the 13 3/8"
casing from surface to 1837'.. Cemented with 3250 sacks Arcticset and
~displaced with 41 bbls. water. Circulated out 50 bbls. cement at surface.
19 - 31 Tested BOP's. R.I.H., drilled float and ~shoe, ~and tested shoe bond
to 500 psi. Directionally drilled and surveyed to 10,566', dropped
multi-shot survey and P.O.H. Ran 216 joints of 9 5/8" 47~/ N-80 Buttress
casing liner with shoe set at 10,562' and the top of P.'B.R. 2107'.
Mixed and pumped 45 bbls. of Howco mud flush, 1500 sacks of Halliburton
Light and 200 sacks of Class "G". Lost complete returns with 340 bbls.
of displacement away out of 647 bbls. total displacement. Preparing
for 2nd stage cementing.
Febr~uary, 1974:
_
Opened lower F.O. cementer. Mixed and pu. mped 30 barrels mud flush followed by
175 sacks Howco light and 200 sacks Class :"G". Displaced with .73 barrels
mud. Closed lower F.O. cementer. Opened middle F.O.' cementer and circulate.
Batch mixed 200 sacks Permafrost II, displaced, with 46 barrels mud, and
Closed F.O. cementer. Drilled cement plug from 10200' to 10477', drilled
catcher sub and landing collar, tested casing to 3500 psi. Ran Sperry Sun
gyro survey and ETT log.
5 - 16
Drilled and surveyed to 11899'. Ran 48 joints of 7" 29~ N-80 Buttress casing
' Cemented with 850 sacks Class "G" and displaced wi'ti
and set shoe at 11894s 'ing excess
243 barrels mud, rever out cement.
Tested 7" x 9 5/8" lap to 1000 psi. Tested 9~5/8" casing to 2650 psi above
3000 ft. Displaced top 2500' of well to diesel. Released rig from A-7 at
0200 hours February 16, 1974.
MAR 1 9 I974
/
SYMOOL-.OF SErViCE'
REPORT
of
SUB-SURFACE
DIR~IONAL
SURVEY
LOCATION
.K)B NUIvlBER
TYPE OF SURVEY DATE
_n
AN 0174 D-6 Single Shot 0:~,0~74
A L D,~',..! F T
DIREC
'64'., 69 ':...,
..... 48.6.,. 30...N 56, 2~ F,...
13 53 6.. 2 ~w
q9 .,.NS~"ZSW
z, 2 ~77.75W
~8 N77.75w
NT~.43W
95 N 59.59 w
66 N58 · 9 ~W
..
,.,.
,~6',
"71
... i.O~
2,'!
I0
'715,83 ~'~, 60,,
97.5 .~+ 1
L,:.Ii~.05. N 55
52~,87 N 52,
'ALL
Tt~UE
.'- .~IF.P_?J~..AnN~ L _ D E P T H ..
~ ........... D_ M ....
~.,,.';.__8.~90 ~3 .... 1~ ..... 6.757,93
DEC¢;RD OF
CALCUL,~TIONS PERFORV, ED 8Y
$U9 DRIFT
.SEA. DXDEC
DEG,
._
5~39.56
5811.15
6056,25.
5410,50
7Q~$,58
72~1,~2
, .... 7..71.,'Z.~ 0 2 .... 7 6 D 2,33
1818~96 775~,27
7~61 ,_89
8 ~ %.~.,
8102
817.3,
98.
49
~'7
70
N~5.25W
N~B.59W
N~4,75w
N~4,TSW
N~2.75W
..N~O,93W
N40,25W
N. 38,75W
~28,59~
1~15~34W
N~Z,.COW
N 7.75w
N.~,75E
SURVEY
I E ¥ ELECT'~DL If CCYDUTE'~
TOTAL cOoRDIWAT;$
1713.69 N 1950,51
1950,8.?.~ ...... 2232,59
2251,61N._ 2562.76
2493,8~ ~I 2~29,~i
2@~7e~7 N ~205,55
3062,~9 N, 3~18,71
33~2,~0 N~_ 3686.~8
STANCE
2500.
'2~03,
296a.
9411,
3771.
4297.
~976e
5261.
DB73e
5598,
5~88.
575~.
50~i,
DOG LEG
sr--v,. RI TY
5 U R E. S
A ~'4 G L E
D :,4 S
2,612 2591.29-
0,709 .. 3395,69
0,69~ 375~.~.~g.
0,9.41 ...
0,417 4.572
~¢' .
:? ' ... 165 $ 65, 100 0
.'~:,.
:' ;' ' ;..,...B.6~ ................... ~ 6B ,- ....5 00 0
,~;::;;~L~,..L.L~.~.,.....:.,. :'...: .... :.: .: ..... 7~.:s, _.~o o o
e65. ~oo o
,.~:..,';.~ '.1.0.6::5, ..lOOO .. 0
._1..16'5 ~ .....1.10O .0 .
,1..200 .................... G ..........
.13.65..,..'...'....1300:...'. 0.
EVERY EVEN
,. ............. 1.565.
E~ .... :..:.....16.6 ,~., . .... 1665,
:.:,':: ...... 1.,7.65. . . ]. 76 5,
.':,,..,,,,.. ..... :~....~.86..~ .................... 1..86 ~ ,...
......:" .". .... '..~.9..6.~. ..... ... 196 5,
;i,.:i.,. :'..,.,::-':.Z°6.~: ...... 2 o ~.,5.
~,,,:..:: ....... 216,5 .......... .-..~ ............ 2..16..5..
;/~..." '.. :22 &.5 '.. · . .2 Z 55 ·
· ~ '. ':..;,-'...2~6.5 ........... 236.5.
· " "'" '" ...,2.465..,...
~..A...~,.,:../.. ~, &.~,.. ........... · ......
· ' .25.6.5.: ........... 2565,
: ..... ! ............ 2.66,9. ' ...2..66.~,
Z.;,....,,.,.-.,....:..,~,7..6 ~ ........ ' ' . ...... ,Z.7. 6.5..,..
"' .2.8.6..5: ..... 2 $ 6 5.
"' ...:,'.:....29..6 ? ' . .... 2.-o.65 '.
~.,~..:.,,:,:,,,,..:,~ .... ~.~.6........; .......... ~,.0.6.~ ,.
i:,:,'.,. :: ........ ~ 1 ~ 8 ................. 3. !.6 ~,
':':" '. '327Q.,...
.,;~;.,.,:,...'.: ...... ~ ,'7.. 2,, ...... 3. ~ 65 ,,.
,:.', :.' '-., .,.. ~ ,o~' ........ ;,. ...... .~...,.
;'. .......... ,4.' 3..~.?.5 ...................... 3~65,
"" ' :~.~..8...0 ......... · ' . .... 3.5~.5....,..
.:7! 500
1500
1700
... 1.~.00
1900
2.000
..... :2,1.C O
2209
2300
.2400
2500
.2~.,00
.... 2.7.0..0..
2~.00
2900
3100
320O
330
·350
,..
100 F£E:T OF 5U~ SEA
.v. EP.T I..CAb ....
COR~,.CT IOIN TCTAL
0
DEPTH.
_ .
CS~RD INA-ES
(...iZ N 0,1":'
],55 :'~
2.95 ;~ 1,4t
1.39 I" 2,10,
,1,6.~,.;~ 2,95
1.57 ~ 3.9~
1,05 N
C,8.7..~
1,.,.~ ~
~" ' Ji~ .........
2,39
6,7.6
!1.1.6
13,5.~! S 34,
....... ~.~ 7.6 S ............ ~.0,,,,19
2,78 $' 82,90
Z, 9'7.....N .... 99 ,O0
.:-::'
· ,, ,,,,,,',,, i" 'h' ........................... ~" ': ....... : ..... ' ' ,.F'
,.,, ............. ,,:;.
.. ,. , . ,.. ,¢%
i..~.,~'.,5.URE.,D_ D.t~PT.]':,t ANb O"rHE~ DATA ·FOR EVER"' £\,'EN
- . T~UE
..,~?,~tE.,ASURED~.,. ........... V.f:,'RT.ICAL. SUB MD-T
;;:,,,L, · .... ~6'B :7. ... 3665, 3600
_
. VERT I CAL
CORRECT ION
OF
.... 3?00 30 8
4000 71
..,6.1~0,
15200 677
..5300.. 757
f' - ,;,,(;, 1 ............... , ................ ~
.o&:,,,,; ~. ........ . ..................... ~. I ....
· ' 8~:)..6, 666,5. .5¢.o0
:"" 7,'"' .... [ ":' .: ..... , ~% ' ' ' .
~ . , 8671 6865,
.),,,~:...¢,,.k,~ ........ i .......... )..... ................. · ....·, ............
..
m '80 ......
81
',7~.
.:.
17:5 i,_
...... ,6.. e.I
· ,
..... 6.,5 . ·
"7, O
,., ........ , .......... ,
..... ~, i.
1.82.1: :.:. ,i
..
.... , ..... - .............. . ............
.C.,,,,: ,,.,.o... ,,.;, .... ...... ...., .......................... ,,¢
m~:` m .. m 9029 7065, 7000 1964
r~ '~ ~,;, ',~:': ............................... ,' , ...............
.. 3'¢:i.,*'"," '.,.." '. ' · . . ". '
.,',,'~,,~,,.:U-,.- (...,.:- ..................... ~.: ....................................'
SEA
203,9C ~',
~O'e,., 69 N .689 ,.89
5~9,5,3 N, ,839,57
6~3,,59 N 929,.03
7~a. 5'8 ~:' i030.18
.,.:.8.5 b:,,3,7, ,¢~.:,1131.6&
960,8.6.,N' 123'6,6.5
1395,01 ,f:4 '. 1;6'~6,3 5
~ "~ ........
19.82,08 ..N, 2267',
- '- '- TRUE
:,~;, -.~' , . .:....., ,, ,,. .
, . ME.A,JtJRED · VERT I cA.!,...S.U~ ......... M'.'~',.TV'.D '.
~'~"~",.~.~,."~ -'~".~"~.,, ,, ,'""-?".~lI".-, "'~'t,,, -,~ ,, ','~---,, ': ...... - ............ ,, ·
&,.. ,~.
~ -. '.: ~21~ 71e5. 7100 2051
',:., .:,, .;,?:.. 20 ~.~. ' .75..~.5. 7500 23.~9
,.~, ....... : ..... kO.[~.I. ................. 76.6 ~, ........ 7 & ~0 2 ~ 2 Z
' .:d. ,..:[0 ¢h'2'_:, , '. ............... r37..65 ': . .7700 .... 2 677 .....................
84.65, 8 ~0.0 ...~ 27,23
'. ..,8.6.00,. :, 2',?68,
._,',,,,,. 8 B ~C ....... Z,,e.O ~ ,., ......
,.... ~ .....
:"~: :'" 8965, '890.0 2918
.
.............. :.i i .............. :..' ....... o, e.o o o ..' :2 i
......... ¢4.¢._.~,;~ .............................................. : ............... :
~ .
..... :.. -,... , ~,~ , · ,,¢
%c:'...': ,r':[:;,.; .', ,,~.:. ". . ' . ..',?,. ':'..
~T;%i'.'...~.,>:L.,~.. ;' . ..,:' .i.:. 3:: ,.:.' ~: ..... :: .................................
.......... .-...¢ .,.. .... , ....... : ..............
..
....... , · : .....¢ ........ . ................ , ....
....
~:.,. .................................................................. .
.:.. ..
~ ........ , ........ · ,.:,....,,: ...... .' . '. .......
. ,
r.
.... ,
.. t ,. .~:...~ ....... .s .,&... ~ :....' ..............
· . ......
.. ............ .',..'. .............
~.,., ....... ~ .............. ~.. 4, ......... ~ ................ ................................ ',;
TO"~. COORDIN'A'rE$,.
...87 · 290i.: .67
:_,¢, .% 72.25
34, ": ~, i i
~ 7 5 '?. O 7
383.3.9.0
3907,~5
3970 ..8....¢
¢.027. ZU
/-+S77.78
~1 l 1,.
41ZgaS. 8
4..14.3.85
4,1.5.3 .,,':~,..0
,,:,.'- 15 !~, 51
4163.
'<,, I r..: 9.5, ?,
~.i 50.79
,i~~s~,'- ~ Z. .., ,. ---
, . . :
, ,~ .... : ....... :. .,
.. ......... :..,.?,:-. /-: ..... L.:..%OO0 -. 999, 9.35 ,. O,~
::~::~,;~;~.,, ............. :..~.Q&¢ ................... ~99g.... 1935., . ..1 ~,~ 5..
',': ;,.;,. ,,:,: ;,','., :':.,.:~.-;,..., .3.0 ~ 0 ..... ~ 997, .2933, 8 e'.~2
· ,,~',-~. .............. ,~.~.0,0~.'..; ............ ~7.g. 2.'.~.. ¢85.7. ...~..~.~,~.~
,..:~,[jL, LL,:,:,, ' ~,~.00~ .... ". ............ ~.~ 9,6. ...... 5~31 · ,11o. 5 .'6~
~',;?,-. . ... ¢ '. . · . . . ~ ~- ,;. :, . ~ . .. , ..~
:,,f~,.,., ~ ~ .... ~ , ,., , .. ,. , , ,
%';~"'"':'"";?:~ '''~ ~'~'"' :' '" '"" "' 8,3~ ~"7. 'g~.,¢~~'s " '"~2 n' 8 '
.~,~:~,~:~ '?,; ,' ,~.,....:.:,,. ¢~. ~ . ,, '( ,. , . , ,
'" "iii ,.~ '~',,'~ ",,. ~ "~" ':,'~ ' ~',' · '; , - ,~ "' ' . ' "' :' ' ' ................ .
~,,~,;, ,, ,~., , ,;,-, , , ; , ,. , , , ,'
¢,:,fi? :;",.,., ...... , ~,. ,,,.....;' ,.., , . . ..,..
BP ALASKA INC.
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
P.O. BOX 4-13'79
3111 - C - STREET
ANCHORA(~E, ALASKA 99503
TELEPHONE (907) 279-0644
March 11, 1974
Attention: Mr. Homer L. Burrell,
Director
Gentlemen:
Well Number BP A-7
Enclosed herewith please find in duplicate Form P-4, Monthly
Report of Drilling and Workover Operations for the above
described well.
lpb
cc: Operations Coordinator, New York
A-7 Well File #17
ery truly yours,
Alaska Inc.
A. K. Howard
MAR 1 3 1974
DI¥1SION OF OIL ANt) gAS
STATE ~T~" ALASKA
OIL AND OAS CONSERVATION COMMI]-[EE
MONTHLY REPORT O'F DRILLING
AND WORKOVER OPERATIONS
WELL
SUBMIT IN DUPLICAT~
2. NAME OF OP~%ATOR
BP ALASKA INC.
3. ADDRESS OF OPERa, TaR
P. O. BOX 4-1379, Anchora~e~ Alaska 99509
4. LOCAT~0N OF WELL
922' WEL, 1700' SNL Sec. 35, TllN, R13E, UPM
'VC O N F I D E N T I A L
AP! NUAIERICAL ~ODE
50-029-20131
LEASE DESIGI~ATION A.~-D SE]RIAL NO.
ADL 28286
IF INDIA]~, ALOTTEE OR TRIBE NAME
8. L~IT F.~rtM OR LEASE NAME
PUT RIVER
g %VELL NO
A-7 (26-11-13)
10. FLELD A-ND POOL, OH WILDCAT
PRUDHOE BAY, PRUDHOE OIL POOL
1~ SEC, T., R., 1%~. (BO~I~OM[ HOI~
o~
Sec. 26, TllN, R13E UPM
Ii, PERMIT NO.
73-41
'"13. REPORT TOTAL DEPTH AT F_~D OF MONTH. CHA. NGES IN HOLE SIZE, CASING A1N"D CL'MENI'ING JOBS INCLUDING DEPTH
SET AND VOL~ USED. PE, H~OHATIONS. TESTS AND HESULTS FISHING JOB~ JUI~K I2q HOLE AND SIDE-T1R. ACKED HOLE
AND ANY OTHER SIGNIFICAJ~IT C'[-LA/~G~ IN HOLE CONDITIONS
F.e.b. ru. ar~y,~ ..1.97_4:
1-5
Opened lower F.O. cementer. Mixed and pumped 30 barrels mud flush followed by
175 sacks Howco light and 200 sacks Class "G". Displaced with 73 barrels mud.
Closed lower F.O. cementer. Opened middle F.O. cementer and circulated. Batch
mixed 200 sacks Permaforst II, displaced with 46 barrels mud, and closed F.O.
cementer. Drilled cement plug from 10200' to 10477', drilled catcher sub and
landing collar, tested casing to 3500 psi. Ran Sperry Sun gyro survey and ETT
log.
5 - 16
Drilled and surveyed to 11899'. Ran 48 joints of 7" 29~/ N-80 Buttress casing
and set shoe at 11894'. Cemented with 850 sacks Class "G" and displaced with
243 barrels mud, reversing out excess cement.
Tested 7" x 9 5/8" lap to 1000 psi. Tested 9 5/8" casing to 2650 psi above
3000 ft. Displaced top 2500' of well to diesel. Released rig from A-7 at
0200 hours February 16, 1974.
MAR ! 3 1974
8IG~ ~ ~ DA~
~, ~, Howara _.
NOTE--Regort on this fo~ is required for ~ch calendar ~th% regardless of the status of operotiofls, o~d must ~ flied in duplicate with the
oil and gas ~onservatlon eommi~ee b~the 15~ of the suec~ding mon~, ~le~ Otherwise directed.
DIVISION OF OIL/tND/]AS
ANCHOtJAI t
~r~m M~nager Operations
BP ALASKA INC.
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Aal ska 99504
P.O. BOX 4-1379
3111-C-STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907) 279-0644
February 12, 1974
J sec J
CONFER:
FILE:
Attention: Mr. Homer L. Burrell,
Director
Gentlemen:
Well Number BP A-7..
Enclosed herewith please find in duplicate Form P-4, Monthly
Report of Drilling and Workover Operations for the above
described well.
lpb
cc: Operations Coordinator, New York
A-7 Well File #17
,,
tVery truly yours,
KA INC.
A. K. Howard
Manager Operat
l"mrm N'o.
RL"V.
STATE O~"~AI.A~ KA
OIL AND GAS CONSERVATION COAAAAIr[EE
MONTHLY RE:PORT O'F DRILLING
AND WORKOVER OPERATIONS
WKLL WI;L~
2. NAME OF OPERATOR
BP ALASKA INC.
P. O. BOX 4-~79, AnchoraSe~ A~aska 99509
'4. ~CA~ON OF W~L!~
922' WEL, 1700' SNL Sec. 35, TllN, R13E, UPM
SUBMIT IN DUPLICA~ !'%~,~C 0 N F I D E N T I A L § APl NUMERICAL ~ODE '
50-02 9-2 0131
L~SE DESIG~A~ON A~D S~IAL NO.
~L 28286
IF INDIA~ A~/~EE OR TRIBE NAME
L~IT.F~{ OR LEASE
PUT RIVER
,
9 WE~ KO
~ A-7 (26-11-13)
PRUDHOE BAY, PRUDHOE OIL POOL
11 SEC , T., R.. M. (~OM
o~
Sec. 26, TllN, R13E UPM
12. P~IT NO
73-41
~EPORT TOTA'L ~]gpTH AT F~'D OF MONTH, CH.A.NGES IN HOLE SIZE, CASING AND C~2VIEN.'rlNG JOBS INCLUDING DEPTH
SET AN~ VOLU1VIES USED PERFORATIONS. TESTS AND RESULTS FISHING JOB~ JU/%TK IN HOLE AND SIDE-TP~ACKED HOLE
A2qD A.NY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS
Jan_ua r.3_,_ .1~77:
13 - 19 Spudded well at 1600 hours, January 13, 1974. Drilled 18 1/2" hole to
2740'. Ran 30 joints of 72# and 39 joints of 68# 13 3/8" N-80 Buttress
casing with shoe at 2698' with 1 1/4" tubing strapped to the 13 3/8"
casing from surface to 1837'. Cemented with 3250 sacks Arcticset and
displaced with 41 bbls. water. Circulated out 50 bbls. cement at surface.
19 - 31 Tested BOP's. R.I.H., drilled float and shoe, and tested shoe bond
to 500' psi. Directionally drilled and surveyed to 10,566', dropped
multi-shot survey and P.O.H. Ran 216 joints of 9 5/8" 47# N-80 Buttress
casing liner with shoe set at 10,562' and the top of P.B.R. 2107'.
Mixed and pumped 45 bbls. of Howco mud flush, 1500 sacks of Halliburton
Light and 200 sacks of Class "G". Lost complete returns with 340 bbls.
of displacement away out of 647 bbls. total displacement. Preparing
for 2nd stage cementing.
[4. I hereby certi ~otn~ i~ true ~ correct
SIGNED ~ ---' '
i, i
UTU~ . ..Manager Op.~rations
NOTE--Report on this form is required for ear. It calendar month~ regardless of tho status of operations, and must bo flied in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, uflleas Otherwise directed.
BP ALASKA INC.
CONFIDENTIAL
P.O. BOX 4-1379
3111 -C-STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907) 279-0644
February 7, 1974
I DRAFT
I sec I
CONFER:
FtL~:
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell,
Director
Gentlemen:
Enclosed please find, in triplicate, Form P-3, Sundry Notices
and Reports on Wells, for the above named well. This report
contains our proposal to suspend the well pending design of
production facilities and downhole completion arrangements.
The well status is outlined in the report.
ery truly yours,
A. K. Howard
Manager Operations
lpb
Enclo sure s
cc: Operations Coordinator, New York
Well File A-7 f/17
FEB 8~74
Form
HEV,
STATE OF ALASKA
922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM
Submit "Intentions" in Triplicate
& "Subsequent Reports" ha Duplicate ~'
13. ELEVATIONS (Show whether DF, RT, OR, etc.
KBE 64.69 AMSL BFE 45.49
API NUM_F, RICAL CODE
50-029-20131
OIL AND GAS CONSERVATION COMMITTEE
6. LEASE DI/IC:LIGNATION AND SERIAL NO.
SUNDRY NOTICES AND REPORTS ON WELLS
lDo not use this form for proposals to drill or to deepen ADL 28286
use "APPLICATION 'FOR [°'EI~i'~'~-' 'for such 'pi;o~osal~,)
1. ?. IF INDIA.N, ALLOTTEE OR TRIBE NA.ME
()IL H GAS []
W ELL W r-LL OTHER
2.NAME OF OPERATOR S. UNIT, FAR1VI OR LEASE NAME
BP ALASKA INC. Put River
3.ADDRESS OF OPERATOR 9. VvELL NO.
P. 0. Box 4-1379, Anchorage, Alaska 99509 A-7 (26-11-13)
4.LOCATION OF W~. I0. Fm~ ~rr~ roo~.. OR W~CAT
At ~,~.r~c~, Prudhoe BaT, Prudhoe Oil Pool
n. s~.c., T., R., ~.. (~o~roM ~o~
OBJ~-CTIVE )
Sec. 26, TllN, ~3E, UPM
- 73-61
Check Appropriate Box To Indicate N, at-ure of N~tice, Re
~ort, or Other Data '
NOTICE OF INTENTION TO:
TEST WATER I~HUT-0FF PULL OR ALTER CASING i
FRACTURE TREAT MULTIPLE COMPI.ETE
SHOOT OR ACIDIZE J J ABANDON*
REPAIR WELL CHANGE PLANR ~
tOther) Suspend IX. J
I,qUBSEQUENT REPORT OF:
WATER SItUT-OFF _J REPAIRING WELL
SHOOTING OR ACIDIZING , , ARANDONMEI~T*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR C0.MPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
Current Status:
Surface Casing ; 13 3/8" 68#/72# N-80 Buttress Casing at 2698' MD
cemented to surface
Intermediate Liner : 9 5/8" 47# N-80 Buttress Casing at 10,562' MD,
cemented to top of liner at 2107'.
We propose to suspend the subject well pending construction of surface facilities.
The well status will be as follows:
Total Depth
~ Casing
: Approximately 11,800' MD (9068' TVD)
: 7" 29# N-80 Buttress casing from T.D. to approximately 10,062' MD
which will provide an Overlap of approximately 500' inside 9 5/8"
casing.
Approximately 450 cu. ft. of Class "G" ceme~ ~ ~ ~ ~ ~ ~ ~
F-'E6 - 8 i974
Cemented With
Manager Operations
I hereby cert~fL~tlthe fore~oin~ i, true and correct
S~GNED ~-- _, ,,
- ^_ ~_ ~:_:~_-"_.4 ~
APPROV~D B~ ~ ~ ~
co~D~o~s o~ppaoVi~, I~ ~ :~ -
TITLE
See Instructions On Reverse Side
BP ALASKA INC.
P.O. BOX ~1.- 1379
3111 -C-STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907! 279-0644
December 18, 1973
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
At tention: Mr. Homer L. Burrell,
D ir ec to r
Gentlemen:
~el.! ~mb~er. BP- ..A.~7 .. (26-11-13)
Well A-7 will be spudded on or about January 9, 1974, as outlined
on Form P-l, Application for Permit to Drill, Deepen, or Plug Back,
approved November 24, 1973, after completing operations on Well C-3.
lpb
cc: Operations Coordinator, N.Y.
Well File A-7 #17
Very tr~yours,
BP INC.
t ~ h'
~L. O..~ay
ict Manager
OEO o ~, I973
Hr. A. K. Howard
~P AIaska I nc.
P. O. ~ox 4-1379
Anchorage, Alaska
99,5O9
Oear Sir:;
Enclosed Is the approved application for pemlt to drl I I the above, referenced
welt on or' abou~ ',November 24, 1973, at a
Range !,3E, [~,M.
and core chips are not requ'tred. A dtre~le~at survey Is
rivers tn Alaska and 'their d'ral,,a,qe systems ha~ ,b~n classified as
t~o,~ for the sp~nlng or mlgra+l~ of anad~~ fish. Ope~+lons )n
Poll'~tlo~.of a~y v~f,e,f~ of fha Sta~ Is pmhtbtf~ by AS 46, Chop~er 03~,
A,~lcie 7 :~,d t~ ~g'u la~l~s p~ ig,ated ~ereunder (Tlft~ t 8:,, A :taska
Adatntsfm,flve Oo~,. Chap~r ~) and by ~he FeSe~,l ~eter Poll~l:o~
C~trot Act, ~ ~en~d Pr,lot fo ~enclng. opemttms, y~ ~y ~
tn the event of suspe~slon or abandoneen~ please give ~,Is off'Ice ,adequate
ad~ance ~ottf~catlon so tha~ we may have ,a ~.ltm~ss prese:n~.
Very truly: yours,
BP ALASKA INC.
P.O. BOX 4-1379
3111 - C - STREET
ANCHORAGE. AJ-A,~ 99503
TELEPHONE (907) 279-0644
November 9, 1973
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell,
Director
Gentlemen:
Well Number A-7 (26-11-13)
Enclosed please find the following documents:
1. Application for Permit to Drill Well A-7 (26-11-13)
2. Proposed Drilling Program Outline
3. Our check in the amount of $100.00 to cover the permit
filing fee.
4. Three copies of surveyor's plat showing well location.
,A Very
truly yours,
ASKA INC. ·
~Howar--~
Manager Operations
lpb
Enclosures
cc: Operations Coordinator, New York
Well A-7 (26-11-13)
Form 10-- 401 ,
BEV, I--I--71
1~. TTPi~ 0~' WORK
SUBMIT IN TR[PLIC,
(Other instructions
reverse side)
STATE O,F ALASKA
OIL AND GAS CONSERVATIO'N ,CO'MMITTEE
PERMIT TO DRILL OR DEEPEN
DEEPEN [-J
b, TYPE0~' WILL
o,,. X °'" 1-1
WELL We-LL OTHRR ZON~. ZONE
2. NAME OF OPEI:LATOR
BP ALASKA TNC.
3. ADDRESS OIF OPERATOR
P. 0. BOX 4-1379, ANCHORAGE, ALASKA 99509
4. LOCATION OF WELL At surface
922' WEL, 1700' SNL Sec. 35, Tll.N, R13E UPM
112' EWL, 2467' SNL Sec. 26, TllN, R13E UPS
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
100 Miles N.E. of Umiat
AP I 50-029-20
5.
6. LEA. SE DESIGNATION A_N'D SEIT. IAL NO.
ADL 28286
IF INDIAN, A. LLO~ OR TRI~E NAM, E
8.UNIT, FARM OR LEASE NAME
PUT RIVER
9. WELL NO.
A-7 (26-11-13)
10. FIELD AND POOL, OR WILDCAT
PRUDHOE BAY PRUDHOE 0IL POOL
!1. SEC., T., R.. M., (BOTTOM
HOLE OBJECTIVE)
Sec. 26, TllN, R13E UPS
12.
14. BOND INFORMATION: STATE OF ALASKA DL-11
TYPE BLANKET Surety and/or No. VIlDF, RAT TN.qITI~AMC. F. C./3_ g01 ~--77--1/, ,,
15. DISTANCE PROM PROPOSED' ' 116. NO. OF ACRES iN LEAS~ -
LOCATION TO NE~,REST ' f *
· ~. rom West lzne o
(Also to nearest dr(g, unit, if any) BP LEASE ADL 28286J 2560
1~'. DISTANCE FROM PROPOSED LOCAT'ION* ~ J 19. PROPOSD DE'PTTI
To NEAREST WELL mmmLING. COMPnETED.252g, t:rmr, !
OR APPLIED FOR, FT. ~' ....... ! _ , ~ _
BP WELL A-3 (27-11-13) {A!iS00 MD (9068' TVD)
~mo,,-t $100,000'00
17. NO. ACRES ASSIGNED TO THiS WELL.
320
20. ROTARY OR CABLE TOoLs
Rotary
21. ELEVATIONS (Show whether DF, RT, CH, etc.} ~-~-. APPROX. DATE WORK WILL START*
ESTIMATED KBE 66' AMSL November 24, 1973
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE ,SIZE OF CASING WEIGHT PER FOOT ,. GRAI)E SETTING DEPTH quantity of cement
'18 1/g" 13 3/8" ,~8# & 72# w-Rn 9~on' 9Aom'3600 cu/ft Arcticset Cement
.12 1/4" g 5/8" 47# W--Rm 10783' 8410 2800 au/fi Nalllhurton 1 i~bt +. 20(
8 l J2" 7" 29# N-80 11795 t g063 450 m~/ft C1 aaa. "~ z~o ~ e~C~
cu/ft
/=.'/I-.T ,
IN AlE )VE SPACE DI~CP,.IBE ]PROPOSI~D PROGRAM: If proposal is to deepen 'give data on present productive zone and proposed
new pi )'duce. lye zone. _If .p._ro_po. sgl is_ iq. cirlll_ or ~eepen cllreet]onally, give pertinent data' on stibsurface 10c~tiorts a~ld .measUred and true
'yeti(cs Ldettbs. Give-blowOt~t preve.nter program. '"-
24. I hereby ~/~that the Foregoing is True and Correct ~l~ --~[m'-'~m '
_.. . ~ c{ 7~ Manager Operations
DAT~. TITLE
SIGNED ' t~ ......-1
,.
...................
(This space for State office use) CONDITIONS OF A.PPIROVAL, IF AH:
[ SAMPLE~ AND CORR CHIPS RF_~UI.R~ M,U,D LOC; OTHER I~.E~UIREMENTS:
[] ~ )~o [] Y~ j~ ~o SEE TRANSMITTAL LETTER
DI~CTION.~.L SURVEY RE~Lr[I~ A.P.L 1N'UI~CAL CO~
l~,~ m .o ,5-0 - ~ z ¢ - ~
p,m~r~ ~~ ,u,r~ov,a, oA~ November 23, 1973
%raovrn~ J; ~. Chai ~an o.~ November 23, *~ In--on, ~ Rev,~ Side
1973
WELL BP A-7 (26-11-13)
PROPOSED DRILLING PROGRAM OUTLINE
Dry bucket 24" hole to 80' _+ below ground level and cement 20" conductor
to surface using Arcticset cement.
Drill 18 1/2" hole vertically to 2700' + BKB and cement 13 3/8" casing
to surface using Arcticset cement. Install 13 5/8" 5000 BOPE.
Drill 12 1/4" hole directionally to 10,783' MD (8410' TVD) + and cement
9 5/8" casing in stages to top of liner at 2100' + with Class "G"
Halliburton light and Permafrost II cement.
Drill 8 1/2" hole directionally to T.D. at 11,800' MD (9068' TVD) and
cement 7" casing to top of liner approximately 500 ft. inside 9 5/8" shoe
with Class "G" cement.
Suspend well for later completion. Displace top 2500' + of well to
diesel.
Blowout preventer program consists of 5000 W.P. pipe rams~ blind rams,
and bag preventer from the 13 3/8" casing point to T.D.
3O 4O
~o 3o
---- 40 I0
I
5'0 '$o 40
i / / ii i~ I ~ ·
SECTIONS 25,26,27,34'35 8~36
SCALE 1"=1/2 MILE
($6-11-15)
(26-11-/3)
6 32-25- Il- I$
"1
~ 4g-34- I1 - 13
MAIN
·
23 -25- II - 1,,3
SUMP
44 -~'-I/-I$
~ 4/-$~-I1-15
I VERTICAL
-- _
ACCESS
P/L ROAD
CERTIFICATE OF SURVEYOR
I hereby certify that I am properly registered and
licensed to practice land surveying in the State of Alaska and
that this plat representsa location survey made by me or
under my supervision, and that all dimensions and other
detoils ore correct.
Date
sURvE~/6R ' ARcHORAG~;
PAD DETAIL
,
SCALE I"= 34X)'
~ACTUAL TO A-I thru A-6 10-30-73 H.S.K.
PROPOSED TD A-?, A-8 10-30-75 H.$.K.
TOP SAG RIVER FORMATION A-6 2-24-72 A.L.L.
TOP SAG RIVER FORMATION A-5 , REVISED 2-17-72 M.L.S.
TOP SAG RIVER FORMATION A-5 2- 3-72 M.L.S.
TOP SAG RIVER FORMATION A-4 REVISED A-I, A-2 1-13-72 M.L.S.
TOp SAG RIVER FORMATION A-$ 12-4-71 M.L.S.
*TOP SAG RIVER FORMATION A-;~ I1-11'-?1 M.L.S.
~TOP SAG RIVER FORMATION A-I, REVISED NAME 9-3O-71 M.L.S.
~BY GYROSCOPIC SURVEY
PAD "A"
LOcated in
SurVeyed for
B. P. ALASKA INC ,
Surveyed by
EM. LINDSEY t~ AssOc..
LAND & HYDROGRAPHIC SURvEYo'RS
2502: West Northern Lights Boulevard Box 4.-081
i~nchorage . Ale,,
CHECK LIST FOR NEW WELL PERMITS
Lease & Well No.
Yes No Remarks
Is well to be located in a defined pool ................. ~~
,
) Do statewide rules apply
.e · · · · · · · · · · · · · · · · · · · · · · · ·
Is a registered survey plat attached ..................
Is well located proper distance from property line ...........
,
Is well located proper distance from other wells ............
Is sufficient undedicated acreage available in this pool ........
l. Is well to be deviated ......................... /~
3. Is operator the only affected party ...................
.~. Can pen~it be approved before ten-day wait ...... ; ........
I0. Does operator have a bond in force ...................
Il. Is conductor string provided ........................
12. Is enough cement used to circulate on conductor and surface .....
13. Will cement tie in surface and intermediate or production strings
14. Will cement cover a.ll possible productive hori'zons ..........
15. Will surface casing cover all fresh water zones ...........
16. Will surface csg. internal burst equal .5 psi/ft, to next string ....
17. Will all casing give adequate safety in collapse and tension ......
_
· · · · · · ·
18. Does BOPE have sufficient pressure rating ...... -..
Additional Requirements: y~..~.~..c/ ~l~o~? C~U~m.~ o~ /~-~zo/ ~ .~.~./~-~,,~//~/ ~roval Recommended:
....... ' " ' ..... ' JAL
LCS