Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout173-041 • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 sWAND AUG 1 7 2.01' Mr. Jim Regg �1 ,72.1 0 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue , 0 Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB A -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad A that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, L- 4 F ) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) A -Pad Date: 04/15/2012 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD 4 API 4 Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal A -01A 2012420 50029201080100 1.3 NA 1.3 NA 11.10 7/21/2009 A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009 A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009 A -04 1720060 50029201150000 0.0 NA NA NA NA NA A -05A 2061280 50029201160100 0.0 NA NA NA NA NA A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009 sj' A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009 A -08 1740040 50029201320000 No conductor NA NA NA NA NA A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009 A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009 A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009 A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009 A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012 A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009 A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009 A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009 A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009 A -18 1921070 50029206300100 SC leak NA NA NA NA NA A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009 A -20 1820130 50029207090000 0.8 NA 0.8 NA _ 5.10 7/20/2009 A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009 A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009 A -24 1820700 50029207430000 29.0 5.8 0.1 11/27/2009 1.70 3/18/2010 A -25A 2011480 50029207640100 0.3 NA 0.3 NA 1.70 8/13/2009 A -26L1 1971060 50029207946000 0.3 NA 0.3 _ NA 1.70 7/21/2009 A -27A 1982350 50029208090100 7.5 NA 7.5 NA 71.40 7/20/2009 A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009 A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009 A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009 A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009 A -32A 1990580 50029213950100 2.0 NA _ 2.0 NA 17.00 4/11/2012 A -33 1851830 50029214100000 0.8 NA 0.8 NA 3.40 8/12/2009 A -34A 1851050 50029213390100 4.4 NA 4.4 _ NA 28.90 7/22/2009 A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009 A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012 A -39 1930280 50029223440000 0.5 NA 0.5 NA 3.40 7/21/2009 A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009 A -41 1941580 50029225300000 SC leak NA NA NA NA NA A -42A 2061300 50029225420100 0.6 NA 0.6 NA 5.10 7/20/2009 A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009 A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009 OPERABLE: A-07 (PTD #1730~) Tubing Integrity Restored Page 1 of 2 ~ Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] ~-~~~G ~r' ~~~~~, ~ Sent: Monday, September 28, 2009 6:52 PM ~ l To: GPB, Area Mgr Central (GC1/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Welis Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Hibbert, Nancy; GPB, Well Pad AB; Regg, James B (DOA); Maunder, Thomas E(DOA); Schwartz, Guy L(DOA) Cc: NSU, ADW Well Integrity Engineer; Quy, Tiffany; Holt, Ryan P(ASRC) Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored All, ~ Weii A-07 (PTD #1730410) passed a TIFL after changing out the orifice gas lift valve proving tubing integrity has been restored. The well has been reclassified as Operable. Please let us know if there are any questions. Thank you, Anna ~Du6e, ~.~. ~alt Torin Roschinger) Well Integrity Caordinatar GPB Wells Group Phone: (907j 659-5102 pager: (9Q7) 659-5100 x1154 ~w~~~~% 1~`.";' ~ ~; ~C~~~: ~~ From: NSU, ADW Well Integrity Engineer Sent: Monday, September 21, 2009 9:50 AM / To: GPB, Area Mgr Central (GCl/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers; Hibbert, Nancy; GPB, Well Pad AB; 'James Regg'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy (DOA) <guy.schwartz@alaska.gov>' Cc: NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: A-07 (PTD #1730410) Failed TIFL All, Well A-07 (PTD #1730410) has sustained casin ressure due to TxIA communication with a failin TIFL. On 09/16/09, the wellhead pressures were tu ing IA/OA equal to SSV/2170/120 and gas lift pressure 2170 psi. The IA pressure appeared to be equalized with the gas lift pressure verifying the pressure was induced an not from downhole. However on 09/21/09, a TIFL failed verifyinq TxIA communication. The well has been reclassified as Under Evaluation. ~ The plan forward is as follows: 1. D: TIFL - FAILEQ 2. S: C/O OGLV 3. D: Re-TIFL Please call with any questions or concerns. Thank you, 11/5/2009 OPERABLE: A-07 (PTD #1730~) Tubing Integrity Restored • Page 2 of 2 Torin Roschinger (alt. Anna Dube) Well Integrity Coordinator Office (907) 659-5102 Cell (406) 570-9630 Pager (907) 659-5100 Ext. 1154 11/5/2009 12/08/08 ~chlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 arrN: sett! WPII .Inh k NO.4995 rY,,r,,~~'p r, t~~` 4, ~ , ~~~ Company: State of Alaska Rz~''ra`£Gt~~~ ; ,9 Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Inn ilucrrinfie.n nee GI n-.~... nn R-03A 4994 INJECTION PROFILE (REVISED) 10/08/08 1 1 13-23A 4994 INJECTION PROFILE 10/21/08 1 1 Ot-26A 4994 SCMT 11/13/08 1 1 D-29 4994 USIT 10/19/08 1 1 15-026 4994 MEM PROD PROFILE - 11/25/08 1 1 H-05A 4994 MEM PROD & INJ PROFILE 11/20/08 1 1 E-32A 4994 SCMT ( 11/04/08 1 1 12-17 4994 PRODUCTION LOG - O (~/ 11/04!08 1 1 P2-41 4994 PRODUCTION LOG - 11/07/08 1 1 1••29/M-25 4994 PRODUCTION LOG 11/04/08 1 1 MPC-05A 4994 MEM LDL ~ 11/15/08 1 1 L-114A 4994 USIT ~ r. (( S 11/03/08 1 1 A-07 4994 PRODUCTION PROFILE ~ - ~} 11/27!08 1 1 07-18 4994 INJECTION PROFILE ~- - 12/02/08 1 1 15-12B 4994 MEM PROD PROFILE (,p -- ~ ~, 11/27/08 1 1 4-40/P-43 4994 MEM LDL i9 - ' '~' . C:y 11/26/08 1 1 N-14B 4994 MCNL-(~'j~(~ ( ' 09/20/08 1 1 01-21A 4994 MCNL 09/29/08 ~ 1 E-29A 4994 MCNL 09/01/08 1 1 PI FARP ACI(AIf1W1 Cn!_C oe rrrnT ov c~~n_~ uw~n w BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ~ ~~ i+ Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 8 8 ATTN: Beth Received by: • • ~` OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored • Page 1 of 2 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Wednesday, August 13, 2008 6:41 PM To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, Area Mgr Central (GC1/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; Kimmet, Megan; GPB, Gas Lift Engr Cc: Winslow, Jack L.; NSU, ADW Well lntegrity Engineer Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Follow Up Flag: Follow up Flag Status: Blue All, :/ Well A-07 (PTD #1730410) passed a TIFL on 08/13/08 confirming tubing integrity. The well has been reclassified as Operable. Please call with any questions or concerns. Thank you, Andrea Hughes ~~~~NE~ SEP ~ 2008 From: NSU, ADW Well Integrity Engineer Sent: Sunday, August 10, 2008 2:02 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, Area Mgr Central (GCi/3/FS3); GPB, GC3 OTL; GPB, GC3 Wellpad Lead; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; Kimmet, Megan; GPB, Gas Lift Engr Cc: NSU, ADW Well Integrity Engineer; Townsend, S. Eliot Subject: UNDER EVALUATION: A-07 (PTD #1730410) Sustained IA Pressure due to TxIA Comm AI I, Well A-07 (PTD #1730410) has been found to have sustained casing pressure on the IA. The TIOs were 2100/2050/130 psi on 08/06/08 when the well initially passed a TIFL. During the following 3 day monitor, the IAP slowly climbed 130 psi and the fluid level in flowed 370 feet. The we-I has been reclassified as Under Evaluation and may be produced under a 28-day clock. Alternatively, Operations may allow the IA pressure to continue to build. The plan forward for the well is as follows: 1. DHD: TIFL -FAILED 2. S: DGLVs 3. F: MITIA to 3000 psi A TIO Plot and wellbore schematic have been included for reference. Please call with any questions. 9/5/2008 OPERABLE:. A-07 (PTD #1730410) Tubing Integrity Restored • Page 2 of 2 Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907} 659-5100 x1154 9/5/2008 PBU A-07 PTD 173-041 J _~~_~ TREE = 4-1116" CM/ WELLHEAD = McEVOY ACTUATOR- BAKER KB. ELEV..- ~~ 64.69" BF ELEV - 45.49' KOP = 3266' Max Angle = 58 C~?? 9 i i 6' Datum MD = 11669' Datum TVD = 8800' SS • E 10-3I4'° TBG, 55.5#, N-80, .0925 bpf, ID = 9.760" E--j 154' 13-318" CSG, 72#, N-80, ID = 12.347" (--~ 269$` Minimum ID = 3.725" @ 9985` BP SET iN C?TIS XN NIPPLE 4-112'° TBG; 12.6#, 13-CR, .0152 bpf: ID = 3.958" (-~ 9997' TOP OF 7" LNR ~ 1002$' 7" LNR, 17#, L-80, .0387 bpf, ID = 6.538" 10028' 9-5i8" CSG, 40#, L-80, .0758 bpf, ED = 8.835" 10562' PERFORATION SUMMARY REF LOG: SWS BHCS ON 02;12/74 ANGLE AT TOP PERF: 35 @ 11510' Note: Refer to Production DB for historical perf data SIZE SPF tNTERVAL OpnJSgz DATE 3-3/8" 4 11510 - 11544 O 08!16!92 3-318" 12 11641 - 11681 O 08109192 2-7/8" 4 11684 - 11699 S 01110!92 2-7i8" 4 11709 - 11756 S 01!10!92 2-7/8" 4 11766 - 11796 S 01/10192 2-7/8" 4 11810 - 11835 C 05;'19;79 S Y NOTES: "~'*4-1f2" CHROMETBG`*` - TRANSMITTER IN WEATHER MONITORING SHACK MUST BE TURNED OFF BEFORE ANY WELL WORK INVOLVING IXPLOSIVES CAN BEGIN! CONTACT PAD OPERATOR: 140' i--~BTM 11-314" X 9-5d8" THERMOCASE 154' 10-3(4" X 9 5r'8" XO 1566' 13-318" XO, 62#;72# 2029' --I 4-112" HES X NIP, ID = 3.813" 2107' 9-5J8" 12' BOT PBR 2122' 9-5(8" HANG 2133` 9-5J8" FOC 2658' 9-5J8" FOC - 4214' 9-5t8" FOC GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3068 3066 7 KBG-2 DMY BK 0 4 4010 3957 30 KBG-2 DOME BK 16 10/28/06 3 7348 6061 55 KBG-2 DOME BK 16 10/28!06 2 8578 6811 54 KBG-2 DMY BK 0 05J28tfl4 1 9825 7506 54 KBG-2 SO BK 20 10/28106 9$91' 4-112" HES X NIP, ID = 3.813" 9902' -) BAKER S-3 PKR, ID = 3.969" 9925' 4-1J2" HE5 X NIP, ID = 3.813" 99$5' 4-1J2" HES XN NIP, ID = 3.725" 9997' WLEG y ELMD TT NOT LOGGED 11578' 11700' ??? 11700' 11700' 11796` 11802' 11806' 11808' PBT® 11864` - 7" LNR, 29#, L-80, A371 bpf, ID = 6.184" 11$94' D REV BY COMMENTS 09/19177 ORIGINAL COMPLETION 06/05104 BJMcLJK FCO 01124/01 LAST WORKOVER 08124106 KSB/PAG GLV CIO 04(05(03 KAK CLEAN UP 10!28106 CJhUPRG GLV C!O 03!24104 LWBJTLP ST t TVD CORRECTIONS 10(29/07 JLJJTLH qDD Tftr1N5F~4ITTER VYAF2NING INFO 05.'05,04 KSlKAK FISH _ 05128104 DAVJKAK GLV CIO MARKERJOINT TOP OF FELL {06!05144} FISH- OK-6 KICKOVER SPRING {0510504} FISH -BAKER PKR ELEMENT - 05(27(90 FISH - KINLEY CUTTER - 01/20101 7" X 4-1(2" OTIS WD PKR~ 4-112" OTES X NIP, ID= 3.813" 4-112" OTIS BP SET 1N OTIS XN NIP, ID = 3.725" 4-112" W/LEG, !D = 3.88" PRUDHOE BAY UNIT WELL: A-07 PERM(1" No: 1730410 API No: 50-029-20131-00 SEC 35, T11 N, R13E, 1696' FNL & 922' FEL BP Exploratlan {Alaska} OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Page 1 of 2 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Thursday, July 17, 2008 7:21 PM To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, GC3 Wellpad Lead; GPB, GC3 OTL; GPB, Area Mgr Central (GC1/3/FS3); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Kimmet, Megan; GPB, Gas Lift Engr; Winslow, Jack L.; NSU, ADW Well Integrity Engineer Subject: OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Follow Up Flag: Follow up Flag Status: Blue Ail, Well A-07 {PTD #1730410) passed a TIFL past-gas lift valve Chan e out on 07/17/08. The passing test verifies that tubing integrity has been restored. The well as been reclassified as Operable and may be on production when convenient. Please cal! with any questions or concerns. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Friday, July 11, 2008 8:30 AM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, GC3 Wellpad Lead; GPB, GC3 OTL; GPB, Area Mgr Central (GCl/3/FS3); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Holt, Ryan P (ASRC); Kimmet, Megan; GPB, Gas Lift Engr; Winslow, Jack L.; NSU, ADW Well Integrity Engineer Subject: UNDER EVALUATION: A-07 (PTD #1730410) for Sustained casing pressure due to TxIA Comm Hi all, Well A-07 (PTD #1730410) has been found to have sustained casing pressure on the IA. The wellhead pressures were tubing/IA/OA equal to SSV/2100/100 psi on 07/06/08. Due to the constraint of not being able to bleed pressure down to the production system due to the shut-down, the diagnostic work took longer to complete. On 07/10/08, a TIFL was conducted and failed due to build up of pressure overnight confirming TxIA communication. The well has been reclassified as Under Evaluation and placed on a 28-day clock. Opera Ions may allow e IA pressure to continue to build pressure. The plan forward for the well is as follows: 1. DHD: TIFL -FAILED 2. Slickline: Change out orifice gas lift valves 3. DHD: re-TIFL 9/5/2008 OPERABLE: A-07 (PTD #1730410) Tubing Integrity Restored Page 2 of 2 • • A TIO plot and wellbore schematic have been included for reference. Please call with any questions. Thank you, Anna ~u6e, ~'. E. Welt lntegr; ty Caordinator GPB We11s Group Phone: {907) 659-5102 Pager: {90T) 659-5100 x1154 9/5/2008 a~ v • ~ ~ y~ O O O T __ 0 a 0 T 0 {~ d 0 Q a 0 1 r ors 0 a co v a 0 a a a a M a st d 4 0 0 0 N 0 0 0 T a 0 o~ v TREE = 4-1116" CNV WELLHEAD= McEVOY'. .u~ ACTUATOR - --._~„~.. BAKER KB. ELEV..- 64.69"~ BF E1EV = ~45.49~ ,..~ KOP - ~~ ., ~. 3266' .Max Anale = 58` ~ 9116') Datum MD = 11668' Datum N D = . 8$00' SS) • 10-3l4" TBG, 55.5#, N-80, .0925 bpf, ID = 9.760" I"I 154' 13-318" CSG, 72#, N-80, ID = 12.347" Minimum ID = 3.725" @ 9985' BP SET IN OTIS KN NIPPLE 0 4-112" TBG; 12.6#; 13-C R, .0152 bpf; ID = 3.958" (-[ 8897' TOP OF 7" LNR I 10028' 7" LNR, 17#, L-80, .0387 bpf, ID = 6.538" 10028' 9-5f8" CSG, 40#, L-80, .0758 bpf, ID = 8.835" 10562' PERFORATION SUMMARY REF LOG: SWS BHCS ON 02/12/74 ANGLE AT TOP PERF: 32° @ 11510' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 4 11510 - 11544 O 0$(16192 3-318" 12 11641 - 11681 O 08109192 2-718" 4 11684 - 11699 S 01110192 2-7l8" 4 11709 - 11756 S 01110/92 2-7(8" 4 11766 - 11796 S 01/10(92 2-718" 4 11810 - 11835 C 05119(79 PBTD 11864° 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 11894' 11578° --~ MARKER JOINT 11700' --~ TOP OF FILL {06/05/04} ??? FISH - OK-6 KICKOV ER SPRING {0510504} 11700' FISH -BAKER PKR ELEMENT - 05(27/90 11700' FISH - KINLEY CUTTER - 01/20/01 11796° 7" X 4-112" OTIS WD PKR 11802` 4-112" OTIS X NIP, ID = 3.$13" 11806' 4-112" OTIS BP SET IN OTIS XN NIP; lD = 3.725" 11808' 4-112" WILEG, ID = 3.88" 49/19/77 ORIGINAL COMPLETION 06/05/04 BJMcLlK FCO 01124101 LAST WORKOVER 08/24106 KSBfPAG GLV C!O 04/05/03 KAK CLEAN UP 10r`28i06 CJNr'PAG GLV Ci0 03124/04 LWBITLP ST { TV D CORRECTIONS 10129!07 JLJITLH ADD TRANSMITTER wARN6NC €NFo 05(05104 KSIKAK FISH 07118/O8~ DAVlJMD GLV Ci0 {07/12108} 05f28f04 DAVlKA GLV Cf0 PRUDHOE BAY UNIT WELL: A-07 PERMfI" No: 1730410 API No: 50-029-20131-Ofl SEG 35; T11 N, R13E, 1696` FNL & 922' FEL BP Exploration (Alaska) R U SHACK I ~ NY a SI7`-B I{ i! INVOLV E TURNED OF F BEFORE A WEL! WORK ING IXPLOSIVES CAN BEGINI CONTACT PAD OPERA 140' TOR: BTM 11-314" X 9-518" THERMOCASE 154' 10-314" X 9 518" XO 1566' 13-318" XO, 62#l72# 2029' 4-1l2" HES X NIP, ID = 3.813" 2107' 9-518" 12' BOT PBR 2122' 9-5(8" HANGER 2133' 9-5/8" FOC 265$' 9-5t8" FOC 4214' 9-518" FOC GAS LIFT MANDREIS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3068 3066 7 KBG-2 DMY BK 0 4 4010 3957 29 KBG-2 DOME BK 16 10/28/06 3 7348 6061 55 KBG-2 DOME BK 16 10128/06 2 1 8578 9825 6811 7506 54 54 KBG-2 KBG-2 DMY SO BK BK 0 20 05!2$/04 07(12(08 9$91' 4-1l2" HES X NIP, ID = 3.813" 8902' BAKER S-3 PKR, ID = 3.969" 9925' 4-112" HES X NIP, ID = 3.813" 9985' 4-1l2" HES XN NIP, ID = 3.725" 9997° WLEG ELMD TT NOT LOGGED Schlumberger RECEiVED 06/05-06/06 JUN 0 8 2005 NO. 3835 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ·:~j~S¡{;; & ;3as CGOS. Gcmffil$SlCn 411ct1craqe cf"'NN~[: ~~..-?'J {Ii "" ...4:;""'0 <' @ cmn¡:\ ,/:.} '- -,,' ~ Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ., () Lf I Field: Prudhoe Bay t1 '3 WI! J b# L D . I D t BL CI CD e 0 og escnpt on ae o or 17-13A Rt___C) - (),~t 11001218 US IT 04/04/05 1 NK-65A AtJ:.::; -{)r:~~ 11084270 SCMT 07/05/05 1 02~10B ::Jtx.5- (j ("., '-I 10964140 LDL 04/06/05 1 01-11 i'~'1 -{~<+ 11051039 INJ ECTION PROFILE (i " => ,/ - r ar' ., [) ,~,) C, h1-5. h<.. 04/29/05 1 01-09A Ie¡.:. - t):~~ 10559825 INJECTION PROFILE . I 07/31/03 1 01-11 ~ .~+ -("'-..,~ 1- 10662950 INJECTI~~ PROFILE Clop 'I - (" "c..e\V~ :;) /éì3i0:"'1 09/16/03 1 11·34 I C>¡4(- ¡-~X 10687720 LDL 12/31/04 1 A-07 1'?~-O~1 9153241 PRODUCTION'PROFILE (! ~ Cd - r,¿C'.. 'I';'Ti¡{~(/,... 02104/03 1 B-36 I C, I,,, - è0;C) 10563182 LDL (I ,,::'I,i - rot', ~..: ó, ì ÎI;::J"'::lIt\-::t.' 07/09/03 1 01:20 i~::).- 14'-- 10687694 PRODUCTION PROFILE 07/16/04 1 K-01 /"'lr.3 - /.:::J./ 11211415 SCMT 06/01/06 1 H-3'O l ~7r - (' ;~~:.., 11217253 US IT 06/01/06 1 D.S:09-06 ¡,,+(~ - f-t.J4' 11258699 US IT 04/13/06 1 e e Petrotechnical Data Center LR2-1 900 E, Benson Blvd. .- Anchorage, Alaska 99508 "".jjf\ " 1\ j' C i ;"-- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth ' 04/02/03 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2728 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay, Endicott, Milne Pt. Color Well Job # Log Description Date Blueline Prints CD A-07 J '7,~.~:)(-// PRODUCTION PROFILE 02/04/03 NK-22A ~,~<~ I-,-.~-'-~ ~ PROD PROFILE/DEFT 02/26/03 PWDW2-1 7'~7 (~- ~..~ (~ ~,~. LDL 03/01/03 "WDW2-1 /~;'%l/' -7'"'~/C'} TEMPERATURE LOG 02/15/03 R-06A LDL 02/28/03 , , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 kF£CEI ?ED Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 AI-I'N: Beth STATE OF ALASKA ' ALAsKA'O1L AND GAS CONSERVATION coMM'iJ~SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] PlUgging [] Perforate ~a Pull Tubing r-I Alter Casing ~ Repair Well [] Other 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 64.69' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number r.3 [~ ~\/.~ ["~~. A-07 1696' SNL, 922' WEL, SEC. 35, T11N, R13E, UM ~'~[~'¢~.~ V ~.~' 9. Permit Number / Approval NO. At top of productive interval 173-041 26o5' NSL, 5O78' WEL, SEC. 26, T11N, R13E, UM At effective depthFEB1 ~ ~_{}01 10. APINumber ~"~ 50- 029-20131-00 2714' NSL, 5072' WEL, SEC. 26, T11N, R13E, UM 11. Field and Pool At total depth Alaska Oil & Gas Cons. Commission Prudhoe Bay Field / Prudhoe Bay 2730' NSL, 5070' WEL, SEC. 26, T11N, R13E, UM Anchorage Pool 12. Present well condition summary Total depth: measured 11899 feet Plugs (measured) true vertical 9068 feet Effective depth: measured 11864 feet Junk (measured) true vertical 9037 feet Casing Length Size Cemented MD TVD Structural Conductor 100' 20" 100' 100' Surface 2698' 13-3/8" 3250 sx 2698' 2698' Intermediate 10562' 113,4'' x 10¥4" x 95/8" 2275 sx 10562' 7985' Production Liner 1866' 7" 850 sx 10028' - 11894' 7629' - 9064' Liner Tieback 10004' 7" 375 sx Class 'G' 24' - 10028' 24' - 7629' Perforation depth: measured Open: 11522' - 11544', 11641'- 11681' Open Below'WD' packer: 11810' - 11835' Sqzd: 11684' - 11796' (three intervals) true vertical Open: 8740' - 8758', 8842' - 8876' Open Below 'WD' packer: 8989' - 9012' Sqzd: 8879' - 8977' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13Cr80 to 9997' Packers and SSSV (type and measured depth) Otis 7" 'WD' packer at 11796'; Baker 'S-3' packer at 9902'; Otis SSSV LN at 2029' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations · 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble "~~.., ~ Title Technical Assistant ,, Date {~)'~-I '~'OJ Prepared By Name/Number: Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicat!A RECEIVED Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER 8tart: 8/29/2000 End: Contractor Name: NABOR8 Rig Release: Group: RIG Rig Name: NABOR8 4E8 Rig Number: 4E8 ::. Si;ib:.~' .............. . .................. ,.. ..... , .......................... :.......... .,..,,, Date From To Hours Task' a[':':~: :':Ph'ase· :i ~i~([~~{i~ :i ii ii I - -:"::' ' '¢' ¢~e! ::::._::E;::.;.:;:~i:!!:!.!::' 8/31/2000 00:00 - 01:30 1.50 MOB DECOMP MOVE ON, RIG UP. 01:30 - 04:30 3.00 MOB DECOMP ACCEPT RIG @ 0130 HRS 8-31-00. BERM UP & SET TIGER TANK. PJU HARD LINES & FILL RIG OITS W/SEAWATER. 04:30 - 06:00 1.50 WHSUR DECOMP P-JU LUBRICATOR. PULL BPV. TEST LINES TO 2500 PSI. 06:00 - 09:00 3.00 KILL DECOMP SlTP 0 PSI, SlCP 0 PSI. OPEN WELL & CIRCULATE OUT FREEZE PROTECTION. 09:00 - 13:30 4.50 KILL DECOMP FILLED HOLE, HOLE HOLE WOULD NOT STAY FULL.MONITOR LOSSES. MIX & PUMP 42 BBL LCM PILL. LOSSES DECREASED TO 1 BPH. LOST 144 BBLS IN 3 1/2 HRS. 13:30 - 14:00 0.50 WHSUR DECOMP ISTALL & TEST TWC TO 3500 PSI. 14:00 - 16:00 2.00 WHSUR DECOMP NIPPLE DOWN X-MAS TREE. 16:00 - 20:30 4.50i BOPSUF DECOMP INSTALL SPACER SPOOL ( WELL SUBSIDED, TO LOW F/BELL NIPPLE) NIPPLE UP BOPE. 20:30 - 00:00 3.50 BOPSUF DECOMP PRESSURE TEST BOPE, LP 250 PSI, HP 3500 PSI. TESTED, OK. 9/1/2000 00:00 - 01:00 1.00 WHSUR DECOMP P/U LUBRICATOR, PULL TWC. & L/D SAME. 01:00 - 01:30 0.50 PULL DECOMP PJU CAMCO SPOOLING UNIT. 01:30 - 03:30 2.00 PULL DECOMP M/U LANDING JT. BACK OUT LOCK DOWN BOLTS. PULL HANGER. (150K) L/D SAME. UP WT 105/130K, DOWN WT 70K. 03:30 - 10:00 6.50 PULL DECOMP POOH & L/D 4 1/2" TBG. TBG STRING DRAGGING. 10:00 - 12:00 2.00 PULL DECOMP POOH & L/D TBG.PULL TO 175K TBG/CONTROL LINE STUCK. SPOT EP MUD LUBE & WORK PIPE. 12:00 - 19:30 7.50 FISH DECOMP P/U 2 - 6 1/4" DC, BUMPER SUB & X-OVER. SCREW IN TBG COLLAR & WORK TBG FREE DOWNWARD. WORK TBG. PULLING TIGHT GOING UPWARD. WORK TBG. RECOVERED & L/D JT# 51. WORKED OUT 35 FT OF JT# 52 & TBG PULLING TIGHT W/NO PROGRESS. ( 19:30 - 21:00 1.50 FISH DECOMP L/D 6 1/4" DCS & BUMPER SUB. STRAP RECOVERED TBG. LOAD 31/2" DP & 4 3/4" DCS. 21:00 - 00:00 3.00 FISH DECOMP P/U SAFETY JT, SCREW INTO TBG. P/U JARS & 4 3/4" DCS. BEGIN WORKING PIPE BACK TO BOTTOM 9/2/2000 00:00 - 02:00 2.00 FISH DECOMP TRIP IN HOLE W/TBG. BACK OFF (UNSCREW) LEAVE TBG ON BOTTOM. 02:00- 03:30 1.50 FISH DECOMP POOH. 03:30 - 04:00 0.50 FISH DECOMP L/D CONTOL LINE. ( BALLED UP AROUND JARS) 04:00 - 06:00 2.00 FISH DECOMP MAKE UP SPEAR FISHING ASSY with 8.375" stop ring ATTEMPT TO WORK DOWN THRU STACK. 06:00 - 11:30 5.50 FISH DECOMP Make up spear with 8.250" stop ring. TIH to 37' .Worked pipe and unable to go any deeper. POOH with spear. Laid down spear and stop ring. Made up 3 1/2" Mule shoe and RIH to 250'. POH with mule shoe. Picked up spear maximum OD 5.90" and RIH to top of wellhead unable to get down. Picked up 3 1/2" mule shoe and RIH with same to 2,055'. POH with BHA and mule shoe. 11:30 - 13:30 2.00 FISH DECOMP Cleared rig floor, cleaned floor and serviced rig. 13:30 - 16:00 2.50 FISH DECOMP Rigged up Schlumberger wireline, RIH with PFCS to 70'. Unable to get down. POH with PFCS. Rigged down Schlumberger. 16:00 - 00:00 8.00 FISH DECOMP Made back to back runs with rope spear on fishing BHA Run Number Spear# Depth Recovery #1 I 71' Wad of line & 1 band #2 1 119' Wad of line & 4 bands Printed: 11/1/2000 10:17:53 AM '---- RECEIVED Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8/29/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES . Code:., ......... ::. :, .::.; ::::. :;.....;.:. ~.'::.: .:.!:.'i?/:?:'?.:}.:i/.;.:/::., 9/2/2000 16:00 - 00:00 8.00 FISH DECOMP #3 1 380' Pulled tight at 181' pulled 150K lost 4 barbs recovered small pieces of line #4 2 183' Wad of line #5 2 152' Wad of line 9/3/2000 00:00 - 08:00 8.00 FISH DECOMP Made back to back runs with rope spear on fishing BHA Run Number Spear# Depth Recovery #6 2 152' Wad of line & I band #7 2 167' Wad on line & 2 bands #8 2 168' small load #9 2 168' no recovery #10 2 152' full spear #11 2 153' 1 OK pull full spear #12 2 163' 60 K pull small amount #13 2 123' 10 K pull full spear #14 2 123' 5 K pull small amount #15 2 123' 5 K pull lost bottom barb no recovery change spear. # 16 1 121' 1 band & small amount # 17 1 121' 10 k pull no recovery # 18 1 121' no over pull no recovery #19 I 12' recovered a small amount 08:00 - 10:00 2.00 FISH DECOMP Picked up mule shoe and TIH with same to 110' worked pipe and attempted to work pipe down. Circulated hole and recovered rubber. Worked down to 112'. 10:00 - 12:30 2.50 FISH DECOMP POH and lay down muleshoe. Picked up notched collar and RIH to 112'. Washed down to 114'. 12:30 - 14:30 2.00 FISH DECOMP Pulled out of the hole with notched collar and recovered small amount of cable. Picked up rope spear and RIH with same to 121'. Pulled wad of cable to surface.450' of cable. Made additional run and RIH to 400' and recovered a small amount of cable. 14:30 - 19:00 4.50 FISH DECOMP TIH with spear to 2,080' working pipe every stand while going inm the hole. No noticable weight Ioos due to cable. Filled hole and monitored hole while pulling out of the hole. Had 10 K overpull at 30'. No control line recovered. 19:00 - 22:00 3.00 FISH DECOMP TIH ti 2080' worked drill pipe every 60'. Tag tight spot at 395' to 420'. POH with tight spot at 1212'. 22:00 - 22:30 0.50 FISH DECOMP Clean and clear rig floor 22:30 - 00:00 1.50 FISH DECOMP Held PJSM and rigged up Schlumberger 4 arm Call log 9/4/2000 00:00 - 02:00 2,00 FISH DECOMP RUN CALIPEPJCCL LOG. R/D LOGGERS. CALLAPSED CSG @ 34-48', 52-66' & 110-120'. Printed: 11/1/2000 10:17:53AM Legal Well Name: A-07 Anchorage Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8/29/2000 End: Contractor Name: N^BORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES 9/4/2000 02:00 - 03:30 1.50 FISH DECOMP P/U 5 5/16" SWAGE ON 4 3/4" DCS. TAG @ 39 FT. WORK SWAGE, NO PROGRESS, 03:30 - 11:30 8.00 FISH DECOMP P/U 3 - 6 1/4" DCS. WORK SWAGE THRU COLLAPSED CSG TO 66'. 11:30 - 16:00 4.50 FISH DECOMP PULL OUT OF THE HOLE AND WITH 5 5/16" CASING SWAGE. cHANGE OUT TO 5 5/8" SWAGE. rih AND WORK THROUGH SPOT AT 39' TO 43'. 16:00 - 18:00 2.00 FISH DECOMP PULL OUT OF THE HOLE WITH 5 5/8" SWAGE AND LAY DOWN BOTTOM HOLE. MAKE UP MULE SHOE AND TIH TO 200'. PULL OUT OF THE HOLE AND LAY DOWN BHA. HOLE IN GOOD SHAPE. 18:00 - 00:00 6.00 FISH DECOMP HELD PJSM AND RIGGED UP SCHLUMBERGER. RAN IN HOLE WITH BAKER INFLATABLE BRIDGEPLUG AND SET AT 2,066' TOP AND ELEMENT AT 2,074'. PULLED OFF DISCONNECT 1.375" FISHING NECK ON IBP. POOH AND RIGGED DOWN SCHLUMBERGER 9/5/2000 00:00 - 03:00 3.00 FISH DECOMP TRIP IN HOLE TO 1780'. DUMP 47 SXS SAND DOWN DP. WAIT 15 MIN. 03:00- 04:00 1.00 FISH DECOMP POOH. 04:00 - 04:30 0.50! FISH DECOMP PRESSURE TEST RBP W/ANN. SI. PRESSURED UP TO 500 PSI, BLED DOWN TO 210 PSI IN 15 MIN. 04:30 - 06:00 1.50 FISH DECOMP TRIP IN HOLE & TAG SD @ 2028 FT. 06:00 - 07:00 1.00 FISH DECOMP TRIP OUT OF HOLE. 07:00 - 08:00 1.00 FISH DECOMP MAKE UP MILL ASSY & TIH. 08:00 - 16:30 8.50 FISH DECOMP MILL OUT COLLAPSED AREAS IN CSG. 35-43', 51-63'. 113-120'. REAM & CLEAN SAME. WOB 4K, 80 RPM. 16:30 - 18:00 1.50 FISH DECOMP POH, INSPECT BHA. MILL 1/2" OUT OF GAUGE. L/D MILL. CLEAR FLOOR. 18:00 - 19:00 '1.00 FISH DECOMP P/U NEW 5 7/8" MILL ASSY. 19:00 - 00:00 5.00 FISH DECOMP MILL OUT COLLAPSED AREAS IN CSG. 35-43, 51-63, 113-120'. 9/6/2000 00:00 - 01:30 1.50 FISH DECOMP FINISH MILLING COLLAPSED CSG TO 120' POOH. INSPECT MILL (GAUGED 5 3/4"). 01:30-04:00 2.50 FISH DECOMP P/U95/8"CUTTER. TIH SPACE OUT & CUT CSG @151'. OBSERVE WELL. 04:00 - 04:30 0.50 FISH DECOMP POOH & L/D CUTTER ASSY. 04:30 - 05:00 0.50 FISH DECOMP CIRCULATE 35 BBL DIESEL BLANKET INTO WELL. 05:00 - 06:00 1.00 FISH DECOMP OBSERVE WELL. 06:00 - 08:30 2.50 BOPSUF DECOMP N/D BOPE. REMOVE LOWER 13 5/8" SPOOL. 08:30 - 09:30 1.00 WHSUR DECOMP REMOVE TBG SPOOL.PULL PACK OFF. 09:30 - 10:30 1.00 WHSUR DECOMP BACK OUT BOLTS ON BRADENHEAD & INSTALL SLIP HANDLES. 10:30- 13:00 2.50 BOPSUF; DECOMP N/U BOPE. 13:00 - 19:30 6.50 FISH DECOMP M/U 9 5/8" CSG SPEAR. RIH & ATTEMPT TO TO PULL CSG. PULLED TO 175K, WOULD NOT COME LOOSE. P/U JARS & ACCELERATOR. JAR ON CSG. WOULD NOT COME FREE.SHUCKED CSG, INSTALLED 8.9" GRAPPLE. JARRED ON CSG & WOULD NOT COME FREE. L/D SPEAR ASSY. 19:30 - 20:00 0.50 FISH DECOMP RIH W/2 STANDS OF DP. 20:00 - 00:00 4.00 FISH DECOMP CIRCULATE HOLE W/HOT WATER & ATTEMPT TO THAW CSG ANNULUS. 9/7/2000 00:00 - 07:30 7.50 FISH DECOMP CIRCULLATE HOT WATER AROUND CSG & ATTEMPT TO THAW ANNULUS. 07:30 - 12:00 4.50 FISH DECOMP P/U SPEAR ASSY. RIH & JAR ON 9 5/8" CSG. WORKED PIPE UP APPROX. 18". WOULD NOT COME FREE. 12:00- 15:00 3.00 FISH DECOMP N/D BOPE. Printed: 11/1/2000 10:17:53AM RECEWED Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8/29/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From - To Hours ·Task: ~.:.::~. :.':.Ph:as ',s~nptlon:¢:::o~;::O:pem~'ons:::,:.~:,~;::,:;;:,;;:;:;:~;.;::;::': : .... :,~.,-~:~;::. 9~7~2000 15:00 - 17:00 2.00 FISH DECOMP CUT OFF & DRESS CSG STUB. 17:00 - 21:30 4.50 FISH DECOMP INSTALL NEW SPOOLS. N/U BOPE & INSTALL TEST PLUG. 21:30 - 00:00 2.50 FISH DEOOMP TEST BOPE AS PERREQUIREMENTS. LP 250 PSI, HP 3500 PSI. TEST, OK. WITNESSING WAIVED BY JOHN CRISP WI AOGCC. 91812000 00:00 - 01:30 1.50 BOPSUF DECOMP FINISH TESTING BOPE, TESTED OK. PULL TEST PLUG. 01:30 - 09:30 8.00 FISH DECOMP P/U MILLING ASSY. RIH & MILL OUT 9 5/8" CSG, (34-44', 51-74', 111-124') TO 6 11/16". 09:30 - 11:00 1.50 FISH DECOMP L/D MILL M/U 7.5" MILL ASSY W/6 1/4" DC. RIH. 11:00- 12:00 1.00 FISH DECOMP CLEAN OUT FLOW LINE, PLUGGED W/ THERMOOASE INSULATION.MILL OUT CSG W/7.5" MILL. 12:00 - 14:00 2.00 FISH DECOMP CLEAN OUT FLOW LINE, PLUGGED W/THERMOCAS INSULATION. 14:00 - 18:00 4.00 FISH DECOMP MILL OUT 9 5/8" CSG, (36-45', 51-74', 111-124') 18:00 - 19:00 1.00 FISH DECOMP LJD MILL M/U 8" MILLASSY ON 6 1/4" DC. RIH. 19:00 - 00:00 5.00 FISH DECOMP MILL OUT 9 5/8" CSG, (34-45', 51-74', 110-124') 9/9/2000 00:00 - 01:00 1.00 FISH DECOMP FINISH MILLING OUT CSG TO 8". 01:00 - 02:00 1.00 FISH DECOMP POOH & L/D B' MILL. 02:00 - 03:00 1.00 FISH DECOMP TIH W/OPEN ENDED DP & TAG UP @ 2079'. NO SAND. 03:00 - 04:00 1.00 FISH DECOMP POOH& L/D SINGLES. 04:00 - 05:00 1.00 FISH DECOMP P/U 8 1/2" MILL ASSY. RIH. 05:00 - 11:30 6.50 FISH DECOMP MILL OUT CSG TO 8 1/2". (34-45', 51-74', 110-124') REAM & CLEAN CSG. 11:30-12:30 1.00 FISH DECOMP L/D81/2"MILLINGASY&61/4"DCS. 12:30 - 14:00 1.50 FISH DECOMP P/U RTTS &CIRC VALVE. RIH TO 2054'. SET PKR. 14:00 - 16:00 2.00 FISH DECOMP PUMP 125 BBLS SEAWATER AROUND PKR @ 1.5 BPM & 600 PSI. PKR HAD FAILED. FILLED ANNULUS, ANNULUS STAYED FULL DURING ENTIRE OPERATION. 16:00 - 17:30 1.50 FISH DECOMP RELEASE PKR. ANNULUS DROPPED. POOH W/RTTS. 17:30 - 19:00 1.50 FISH DECOMP P/U 3" OVERSHOT, JARS & BUMPER SUB. RIH. 19:00 - 20:00 1.00 FISH DECOMP FILL HOLE. ENGAUGE FISH @ 2072'. 20:00 - 21:30 1.50 FISH DECOMP POOH & RECOVER IBP. 21:30- 22:30 1.00 FISH DECOMP L/D IBP & BHA. 22:30 - 00:00 1.50 FISH DECOMP P/U 8 1/8" WASH PIPE & RIH. 9/10/2000 00:00-01:00 1.00 FISH DECOMP RIH W/ 31/2" DP & WASH PIPE. 01:00 - 02:30 1.50 FISH DECOMP KELLY UP & BREAK CIRCULATION @ 2056'. CIRCULATE DOWN OVER FISH @ 2080'. WASH DOWN TO 2112'. SET BACK KELLY. 02:30 - 04:30 2.00 FISH DECOMP POOH & L/D WASH PIPE. 04:30 - 07:00 2.50 FISH DECOMP P/U OVERSHOT ASSY & RIH. 07:00 - 07:30 0.50 FISH DECOMP ENGAUGE FISH. PULL 135-150K DRAGGING, WHILE COMING FREE. 07:30 - 09:30 2.00 FISH DECOMP POOH W/3 1/2" DP TO FISH. RELEASE OVERSHOT. 09:30 - 18:00 8.50 FISH DECOMP POOH & L/D 4 1/2" TBG STRING. 18:00 - 19:30 1.50 FISH DECOMP L/D OVERSHOTASSY. CLEAR FOOR. R/U TO P/U 3 1/2" DP. 19:30 - 00:00 4.50 FISH DECOMP P/U 3 1/2" DP & RIH. HAD TO CIRC OUT DIESEL & INSULATION EHILE RIH. @ 1460'. RIH TO 3450'. 9/11/2000 00:00 - 02:00 2.00 FISH DECOMP TIH WITH 3 1/2" DP 02:00 - 02:30 0.50 FISH DECOMP CIRCULATE OUT 60 BBLS DIESEL AND CRUDE AT 6580' 02:30 - 07:00 4.50 FISH DECOMP CONTINUE TO RIH WITH 3 1/2" DP to 9855' 07:00 - 08:00 1.00 FISH DECOMP BREAK CIRCULATION. 4 BPM AT 850#. 08:00 - 14:00 6.00 FISH DECOMP ROTATE 50 RMP. WASH F/9855' TO 9955'. INCREASE RATE TO 6 BPM AT 1400". CIRC HOLE CLEAN. 14:00- 18:00 4.00 FISH DECOMP TOH W/WASHPIPE 18:00-23:00 5.00 FISH DECOMP PU 8 3/8" OVERSHOT W/ 41/2" GRAPPLE. TIH W/ 31/2" DP TO 9950'. Printed: 11/1/2000 10:17:53 AM Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8~29~2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From ;To HOurs T~S~ :~: '~:: r:: ............................. ............... :::::::iii ........ '"'"'ii 9/11/2000 23:00 - 00:00 1.00 FISH DEGOMP WORK DOWN OVER FISH. JUNK ON TOP OF FISH @ 9953' WORK DOWN TO 9955' & HAD PRESSURE INCREASE FROM PAGKOFF. DID NOT ENGAUGE FISH. TOO MUCH JUNK. 9/12/2000 00:00- 05:00 5.00 FISH DECOMP TOH W/3 1/2" DP & O/S 05:00 - 06:00 1.00 FISH DECOMP PU 8 3/8" WASHOVER SHOE W/8 118" WASHPIPE 06:00 - 10:00 4.00 FISH DECOMP TIH with washpipe, Picked up Kelly and tag top of 4 1/2" fish at 9,995' 10:00 - 17:00 7.00 FISH DECOMP Washed from 9955' to 9991' with 8 1/8" wash pipe ( hit hard spot from 9985' to 9987' Drilled conventionally ). Reverse circulated hole clean at 9991'. Set back kelly 17:00 - 22:00 5.00 FISH DECOMP Pulled out of the hole with 3 1/2" Drill Pipe and wash pipe. Laid down 8 1/8" wash pipe and 8 3/8" shoe. 22:00 - 23:00 1.00 FISH DECOMP Held prejob safety meeting covering "MAKE UP BHA and TIH with O/S ". Cleand rig floor 23:00 - 00:00 1.00 FISH DECOMP Trip in the hole with O/S, BHA and 3 1/2" Drill Pipe to 1,324' 9/13/2000 00:00 - 03:00 3.00 FISH DECOMP RTIH W/3 1/2" DP AND O/S 03:00 - 04:00 1.00 FISH DECOMP WASHOVER & ROTATE FISH. PU WT 141K, SO WT 110K, ROTATING WT 123K 04:00 - 09:30 5.50 FISH DECOMP POOH WITH 3 1/2" DP 09:30 - 11:00 1.50 FISH DECOMP B/O AND LD SBR 11:00 - 14:30 3.50 FISH DECOMP MU O/S W/DUAL GRAPPLE, TIH TO +/- 7500' 14:30 - 16:00 1.50 FISH DECOMP SLIP AND CUT 84' DRILL LINE 16:00 - 17:00 1.00 FISH DECOMP CONT RIH. LATCH FISH AT 9968' 17:00 - 18:00 1.00 FISH DECOMP ATTEMPT TO RELEASE K-ANCHOR 18:00 - 23:30 5.50 FISH DECOMP TOH WET, DROP BALL DID NOT SEE SHEAR PSI, DROP STEEL RABBIT. RECOVERED 22' OF K-ANCHOR 23:30 - 00:00 0.50 FISH DECOMP LAYED DOWN O/S AND LD FISH. Anchor left in packer. 9/14/2000 00:00 - 00:30 0.50 FISH DECOMP CLEAR RIG FLOOR PREPARE TO PICK UP MILL ASSEMBLY 00:30 - 05:00 4.50 FISH DECOMP PU PKR MILL 8.5" WITH 3 7/8" BULL NOSE ON JB. TIH TO 9958'. PICK UP W'I' 141K#, SLACK W'I' 110K#, ROT VVT 122K# 05:00 - 06:00 1.00 FISH DECOMP KELLEY UP & TAG PKR @ 9988' 06:00 - 14:00 8.00 FISH DECOMP MILL PACKER FROM 9988' TO 9994'. UNABLE TO MAKE PACKER FALL DOWN HOLE 14:00 - 16:00 2.00 FISH DECOMP REVERSE CIRCULATE HOLE CLEAN, 4 1/2 PBM, 700 PSI. SET BACK KELLY 16:00 - 17:30 1.50 FISH DECOMP POOH FROM 9,994' TO 9119, HAD DRAG FROM 9K TO 39 K OVER PICKUP W'I' OF 141K#, SLKWT 110K#. HOLE SWABBING WHILE PULLING OUT OF HOLE 17:30- 22:30 5.00 FISH DECOMP OBSERVE WELL FOR FLOW. WELL STATIC. CIRCULATE / BOTTOMS UP 4.8 BPM @ 900 PSI PUMPED A TOTAL OF 11,500 / STROKES. HAD SLIGHT SHOW OF GASFROM BOTTOMS UP AT / SURFACE AFTER 10,700 STROKES. PUMPED ADDITIONAL 800 STROKES FOR A TOTAL OF 11,500 STROKES=672 BBLS OF SEA WATER 22:30 - 00:00 1.50 FISH DECOMP MONITOR WELL 10 MIN, OK. PULL SLOW 25K OVER PICKUP WT. WELL SWABBING, FILL DRILL PIPE ON EACH STAND WHILE PULLING OUT OF THE HOLE. CONT. TO PULL SLOW TO 8580'. DRILL PIPE PULLING WET. LOST ALL OVERPULL AT 8,580'. PICK UP WT @ 125K. CONTINUED TO PULL OUT OF THE HOLE WATCH FOR JUNK. WELL QUIT SWABBING AND TAKING PROPER FILL WHILE PULLING OUT OF THE HOLE. PULLED OUT OF THE HOLE WITH MILLING ASSEMBLY TO SURFACE. 9/15/2000 00:00 - 01:00 1.00 FISH DECOMP CONTINUE TO PULL OUT OF HOLE WITH MILL TO SURFACE. Printed: 11/1/2000 10:17:53 AM Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Sta~: 8/29D000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From - To Task :~: 9/15/2000 01:00 - 01:30 0.50 FISH DECOMP ~Y DOWN BHA. CL~R AND CLaN RIG FLOOR. ALL 3 JUNK BASKETS FULL OF S~LL FINE METAL CU~INGS & PIECES OF CONTROL LINE. 01:30 - 04:00 2.50 FISH DECOMP PULL WEAR RING AND SET TEST PLUG. FILL BOP EQUIPMENT. TEST BOP EQUIPMENT TO 250 / 3000 PSI, TEST ANNU~R TO 250 / 3000 PSI. RD TEST EQUIPMENT, BLOW DOWN LINE, AND PULL TEST PLUG 04:00 - 07:30 3.50 FISH DECOMP MU 4.8' SPEAR ASSEMBLY. TIH WITH 3 1/2' DRILLPIPE. 07:30 - 10:30 3.00 FISH DECOMP PICK UP KELLY AND ENGAGE FISH AT 9994'. JAR ON FISH. pULLED 90K OVER PICK UP WEIGHT TO TRY WORKING FREE. NO LUCK. REL~SE SP~R. SET BACK KELLY. 10:30 - 14:30 4.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE. ~Y DOWN SPEAR 14:30 - 15:30 1.00: FISH DECOMP MU PACKER MILL ASSEMBLY. CLEAR FLOOR. 15:30 - 18:00 2.50 FISH DECOMP TIH WITH 3 1D" DRILLPIPE AND MILL ASSEMBLY 18:00-23:00 5.00 FISH DECOMP PICK UP KELLY AND TAG TOP OF PACKER AT 9994'. MILL2' FROM 9994 TO 9996'. PACKER FELL FREE 23:00 - 00:00 1.00 FISH DECOMP PUSH PACKER TO 10027' AND CIRCU~TE BOSOMS UP. 9/16/2000 00:00 - 01:00 1.00 FISH DECOMP CONTINUE TO PUSH PACKER TO 10,027' AND CIRCU~TE BOSOMS UP. 01:00 - 06:00 5.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE AND MILL 06:00 - 08:00 2.00 FISH DECOMP BREAK OUT MILL AND BOOT BASKETS. CLEAN OUT SAME AND CLEAR RIG FLOOR. ~KE UP SPEAR AND BHA TO PICK UP MILLED PACKER. 08:00 - 10:30 2.50 FISH DECOMP TIH WITH 3 1/2" DRILLPIPE AND SP~R. 10:30 - 11:00 0.50 FISH DECOMP PICK UP KELLY. ENGAGE FISH AT 10,027'. SET BACK KELLY. 11:00 - 15:30 4.50 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE. FISH D~GGING UP TO 40K OVER PICKUP WEIGHT. 15:30 - 18:00 2.50 FISH DECOMP PULL BHA. BREAK OUT AND ~Y DOWN FISH. CLEAR FLOOR. MAKE UP POLISHING MILL. 18:00 - 22:00 4.00 FISH DECOMP RIH WITH 3 1/2" DRILLPIPE. 22:00 - 23:00 1.00 FISH DECOMP TAG AND POLISH 7" AT 10,028'. PUMP 4 BPM AT 750 PSI AND 80 RPM. 23:00 - 00:00 1.00 FISH DECOMP TOH WITH 3 1/2" DRILLPIPE 9/17/2000 00:00 - 02:30 2.50 CLaN DECOMP CONTINUE TO POOH WITH 3 1/2" DRILLPIPE 02:30 - 03:30 1.00 CASE DECOMP ~Y DOWN BHA AND CL~R RIG FLOOR 03:30 - 12:00 8.50 CASE DECOMP RIGGED UP SCHLUMBERGER AND RIH WITH 8.5" GAUGE RING AND JB TO 45'. UNABLE TO GET DOWN. POH AND PICKED UP 8.1" GAUGE RINGAND JB AND RIH TO 177'. NO PROBLEM. POH AND PICKED UP 6.1" GAUGE RING WITH JB. RIH TO 10,074'. UNABLE TO GET DOWN. POH AND CHANGE OUT GAUGE RING WITH 5.95" GAUGE RING. RIH TO 10,082'. UNABLE TO GET DOWN. POH AND PICKED UP 8.37" GAUGE RING AND JB. RIH TO 45' AND SAT DOWN. POH AND PICKED UP 8.25" GAUGE RING WITH JB TO 45'. UNABLE TO GET DOWN. POH WITH GAUGE RING. RIG DOWN SCHLUMBERGER 12:00 - 17:00 5.00 CASE DECOMP MU 8 1/2" STRING MILL BHA. RIH AND R~MED SPOT FROM 33'-56' WITH NO PROBLEMS. REAMED FROM 56'-63' WITH 2K D~G. R~MED FROM 76' TO 89' AND D~G CLONED UP. CONTINUED TO R~M DOWN TO 152' WITH NO PROBLEM. 17:00 - 18:00 1.00 CASE DECOMP RIH WITH 8 1/2" MILL ASSEMBLY TO 2,180'. NO PROBLEMS ENCOUNTERED. 18:00 - 19:30 1.50 CASE DECOMP POH WITH 3 1D" DP 19:30 - 20:30 1.00 CASE DECOMP ~Y DOWN 8 1D" BHA ASSEMBLY AND CLEAR RIG FLOOR Printed: 11/1/2000 10:17:53 AM Legal Well Name: A-07 Anchorage Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8~29~2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From- Tol' Hours Task i~:~'::':!i :::~:?:~h'~i;!ii' i ~iiiiiib~.~i~ti~ii!~ b~ti~ 9/17/2000 20:30 - 21:30 1.00 CASE DECOMP PICKED UP 6" MILL AND 6" STRING MILL. MADE UP 6" MILL BHA 21:30 - 23:00 1.50 CASE DECOMP RIH WITH 6" MILL BHA AND 3 1/2" DRILL PIPE TO 4,250' 23:00 - 00:00 1.00 CASE DECOMP CUT AND SLIP 84' OF DRILLING LINE 9/18/2000 00:00 - 02:30 2.50 CASE DECOMP Cont. to rih with 6" Water melon mill to 10428' Seen no Obstruction. 02:30 - 07:30 5.00 CASE DECOMP POOH & Lay Dn Mill & Watermelon Mill. 12:00 - 17:00 5.00 CASE SCAL DECOMP MU 6" Bit & 7" 26~ Scraper & rih to 1042' & reverse circ. 2-drill pipe volumes. 17:00 - 22:00 5.00 CASE SCAL DECOMP POOH with Scraper & lay dn same & clean floor. 22:00 - 23:59 1.98 CASE DECOMP Make up HOWCO ESZV Bridge plug & rih with same. 9/19/2000 00:00 - 03:00 3.00 CASE DECOMP TIH to 10299' With Howco ESZV Drilll. 03:00 - 03:30 0.50 CASE DECOMP Set ESZV Drill Plug at 10,299' in 7" liner 03:30 - 06:00 2.50 CASE DECOMP POOH with ESZV Setting Tool to 2300' 06:00- 06:30 0.50 CASE DECOMP Service Rig 06:30 - 09:00 2.50 CASE DECOMP Continue to pull out of the hole with EZSV Setting Tool and Lay down same 09:00 - 11:00 2.00 CASE DECOMP Make up 9 5/8" RTTS and RIH to to 2,162' and set RTTS in 9 5/8" casing. 11:00 - 11:30 0.50 CASE DECOMP Pressured up down drill pipe to 1000 psi to tes EZSV at 10,299', 7" x 9 5/8" liner lap and RTTS packer. Held for 15 minutes. Good test. Relaeased pressure 11:30 - 13:00 1.50 CASE DECOMP TOH with 9 5/8" RTTS and laid down Same 13:00 - 15:00 2.00 CASE DECOMP Picked Up 9 5/8" RBP and RIH to 2152'. Set at 2,152'. Picked up off RBP 1 stand and spotted 400 # of 20/40 Carbolite. 15:00 - 16:30 1.50 CASE DECOMP POH with 3 1/2" drill pipe and running tool 16:30 - 18:00 1.50 CASE DECOMP Make up casing cutter and RIH with same. Cut off 9 5/8" casing 3' below casing slips. 18:00 - 20:00 2.00 WHSUR DECOMP Nipple Down BOPE. 3'- 9 5/8" stub pulled out with Tubing Spool. 20:00 - 22:30 2.50 WHSUR DECOMP Pulled 9 5/8" casing slips. Changed out drilling spool 22:30 - 00:00 1.50 WHSUR DECOMP Nipple Up 13 3/8" 5,000 # BOPE 9/20/2000 00:00 - 01:30 1.50 BOPSUR DECOMP -NU 13 3/8" 5,000 # BOPE 01:30 - 04:00 2.50 BOPSUI; DECOMP Test BOPE to 250/3500 psi. Annular to 3500 psi. RD test Equip 04:00 - 05:00 1.00 CLEAN DECOMP RIH w/Retieving tool to retrieve 9 5/8" RBP 05:00 - 06:00 1.00 CLEAN DECOMP Reverse circulate at 4 bpm. Washed 7' of sand off top of RBP at 2152'. Circulated hole clean. Latched and released RBP 06:00 - 07:30 1.50 CLEAN DECOMP Toh & lay down HES Plug & Clear floor 07:30 - 09:00 1.50 BOPSUR COMP set test plug & change rams to 7" & test to 3500 psi. 09:00 - 10:30 1.50 CASE TIEB1 Rig casing tools to run 7" tie-back. 10:30 - 23:59 13.48 CASE TIEB1 Run 7" csg. to 8900' 9/21/2000 00:00 - 01:30 1.50 CASE TIEB1 cont to rih with 7' csg. to 10028' 01:30 - 03:00 1.50 CASE TIEB1 rig up 200 ton elevators & dowell cmt. head. 03:00 - 06:00 3.00 CASE TIEB1 circ. at 3-BPM & Sting in to Tiebck to verify space out. & pick up and continue to circ. 2-annular volumes @ 5-6 BPM 06:00 - 09:00 3.00 CASE TIEB1 Pump 50-bbl. h20 +290 sxs lead cmt. 10.9 ppg. +85-sxs tail 15.8 ppg. & put in place with 381 bbl. sea H20 plug bumped. 09:00 - 09:30 0.50 CASE TIEB1 Set baker tieback packer & pull 50 k over. 09:30 - 15:00 5.50 WHSUR TIEB1 nipple down bop & set 7" slips & cut off & dress same & nu cameron well head equipment & test same to 5000 psi. 15:00 - 18:00 3.00 BOPSUF COMP Nipple up BOP & test same to 3500/250 psi. 18:00 - 21:00 3.00 CASE COMP Make up TAM tool & rih to 2189' & locate & open tool 21:00 - 22:30 1.50 DHEQP COMP Freeze protect well with dead crude pumped 114-bbl. down annulus & took returns through drill pipe until crude at surface & close valve & reverse out excess crude in drill pipe to tiger tank. 22:30 - 23:59 1.48 DHEQP COMP pooh with tam setting tool & lay dn same & prepare to set wear ring. Printed: 11/1/2000 10:17:53 AM Legal Well Name: A-07 iCommon Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 8~29~2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From- To:i Hours :Task: ;9/22/2000 00:00 - 00:30 0.50 WHSUR COMP Run & set wear ring in head 00:30 - 01:00 0.50 CASE COMP Pressure test csg. to 3500 psi. OK. 01:00 - 05:00 4.00 CLEAN COMP Mu 6" bit & junk basket & rih with same to drill float equipment. 05:00 - 14:30 9.50 CLEAN COMP Tag. cmt. stringer @ 9892' & drill & wash out to 9929' & continue to clean out 7" to 10254' 14:30 - 15:30 1.00~ CLEAN COMP circ. bottoms up @ 5-BPM 15:30 - 17:00 1.50 CASE COMP Pressure test csg. to 3500 psi. after drill all float equipment. OK. 17:00 - 20:30 3.50 CASE COMP Repair electrical panel for mud pump. 20:30 - 23:59 3.48 CASE COMP clean out to ez-drill plug @ 10299' & drilling out. 9/23/2000 00:00 - 00:30 0.50 CASE COMP Drill Howco ESZY Bridge plug. 10299' 00:30 - 01:30 1.00 CLEAN COMP Pick up singles to 11599' 01:30 - 04:30 3.00 CLEAN COMP rotate & wash down in 7" csg. had hard spots at time. 11599'--11700' 04:30 - 06:00 1.50 CLEAN COMP circ. & condition hole & upmp 40-bbl. high vis sweep. 4.5 bpm @ 1150 psi. 06:00 - 07:00 1.00 CLEAN COMP cont. to clean well bore F/11700--11785' 07:00 - 13:30 6.50 CLEAN COMP Circ. Hi -Vis Sweep & displace well bore with cln-Filtered sea water. 13:30 - 23:30 10.00 CLEAN COMP POOH Laying down 3.5" drill pipe & BHA. 9/24/2000 12:00- 12:30 0,50 CLEAN FILL COMP set wear ring. 12:30 - 13:30 1.00 CLEAN FILL COMP Make up 5.95" reverse circ. basket & scraper. 13:30 - 23:30 10,00 CLEAN FILL COMP pick up 3.5" drill pipe to 10131' 23:30 - 23:59 0.48 CLEAN FILL COMP rig up hot oil to pump hot diesel. 9/25/2000 00:00 - 00:30 0.50 CLEAN FILL COMP Pumped 60 bbls. of Hot diesel down drill pipe 00:30 - 02:00 1.50 CLEAN FILL COMP Closed Rams and Bull Headed 70 bbls. of Seawater down drill pipe at 8997' at 1.5 bpm at 1500 psi. Released pressure opend rams. 02:00 - 02:30 0,50 CLEAN FILL COMP RIH with 3 1/2" drill pipe in stands to 10,130'. 02:30 - 04:00 1,50 CLEAN FILL COMP Pumped 40 bbl Hi Vis sweep down annulus and reversed out recovered small pieces of rubber,traces of sand, and debris 04:00 - 05:00 1.00 CLEAN FILL COMP Monitor well. Cut and slip 84' of drilling line 05:00 - 11:30 6.50 CLEAN FILL COMP TOH whilst laying down 3 1/2" drill pipe 11:30 - 12:00 0.50 CLEAN FILL COMP Lay down reverse circulating basket and 7" casing scraper 12:00 - 13:00 1,00 CLEAN FILL COMP Rig Up Hallibuton Slickline Unit 13:00 - 17:30 4,50 CLEAN FILL COMP RIH with 5.985" GR & JB. Run # 1 RIH to 10,097' recovered rubber and small metal pieces. Run# 2 RIH to 10,080' and recovered rubber( less than Run # 1). Run # 3 RIH to 10,070'. Almost no recoveryw/trace of metal cuttings. 17:30- 18:00 0.50 CLEAN FILL COMP Rig Down Halliburton SlickLine unit. 18:00 - 18:30 0.50 WHSUR COMP Pull Wear ring 18:30 - 20:00 1.50 RUNCOI~! COMP !Held PJSM, Picked up Casing toolsand rig up to run 4 1/2" Cr i completion string 20:00 - 20:30 0.50 RUNCOI~! COMP !Picked up and Ran tail assembly and 7" production packer 20:30 - 00:00 3.50 RUNCOI~I COMP RIH with 4 1/2" production tubing to 980' 9/26/2000 00:00 - 04:00 4.00 RUNCOI~! COMP Run in the Hole with 4 1/2" Completion assembly 04:00 - 05:00 1.00 RUNCOI~! COMP Change out power tongs. 05:00 - 00:00 19.00 RUNCOI~ COMP Run in the hole w/4 1/2" Completion Assy. Ran 235 jts tbg. 9/27/2000 00:00 - 01:00 1.00 RUNCOI~! COMP RUN IN HOLE VV/COMPLETION ASSY TO 10042'. 01:00 - 02:00 1.00 RUNCOI~I COMP MAKE UP LANDING JT. & LAND HGR. 02:00 - 03:30 1.50 RUNCOI~! COMP REVERSE CIRCULATE W/INHIBITED BRINE. 3 BPM @ 250 PSI. 03:30 - 04:00 0.50 RUNCOr~ COMP DROP BALL & PRESSURE TEST LINES TO 4500 PSI, OK. 04:00 - 04:30 0.50 RUNCOI~ COMP PRESSURE UP TO 4000 PSI, SET PKR. TEST TBG TO 4000 PSI FOR 30 MIN, OK. 04:30 - 06:00 1.50 RUNCOI~ COMP BLEED OFF PRESSURE TO 1500 PSIi PRESSURE UP ON ANNULIUS TO 1500 PSI, ANNULUS WOULD NOT HOLD PRESSURE. ATTEMPT RE-TEST, TEST FAILED. Printed: 11/1/2000 10:17:53AM Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Sta~: 8/29/2000 End: Contractor Name: NABORS Rig Release: Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From To HOurs Task. . . : Code 9/27/2000 06:00 - 08:00 2.00 RUNCO~ COMP ~D ~NDING JT. FILL BACKSIDE & MONITOR WELL. 08:00 - 14:00 6.00 RUNCO~ COMP ~U SLICKLINE EQUIP. SET STOP CATCHER KICKOVER TOOL & PULL RP SH~R VALVE. (GLM 50' DEEP TO TALLY) RIH & SET DUMMY IN GLM. ~D SLICKLINE EQUIP. 14:00 - 15:00 1.00 RUNCO~ COMP TEST TBG TO 3800 PSI, OK. OPEN 9 5/8" X 7" ANNULUS & PUMP DOWN 7" X 4 1/2" ANNULUS W/2200 PSI ON TBG. NO RETURNS. SHUT IN 9 5/8" ANNULUS. REVERSR CIRCU~TE AROUND 7" ANNULUS & UP 4 1/2" TBG. CONFIRM PKR NOT HOLDING. 15:00 - 20:30 5.50 RUNCO~ COMP ~U SLICKLINE EQUIP RIH & RECOVER CATCHER SUB. RIH & RECOVER BALL & ROD. RIH & RECOVER RHC PLUG. ~D SLICKLINE EQUIP. 20:30 - 00:00 3.50 BOPSUF COMP SET ~C TEST BOPE. HP 3500 PSI, LP 250 PSI. TESTED OK. TEST WAIVED BY JOHN CRISP W/AOGCC. 9/28/2000 00:00 - 00:30 0.50 BOPSUF COMP ~D TEST JT & RETRIEVE ~C VALVE. 00:30 - 04:00 3.50 PULL COMP ~U SCHLUMBERGER & RUN CCL TO 10250' & LOCATE TBG TP, PKR & GLMs. PKR 2 10071-10075'. WLEG ~ 10115' (SEE CCL LOG F/DETAILS) 04:00 - 08:30 4.50 PULL COMP POOH & RIH W/CHEMICAL CU~ER, CUT TBG ~ 10030'. ~D SCHLUMBERGER. 08:30 - 10:00 1.50 PULL COMP M/U ~NDING JT. PULL HANGER & ~D SAME. (P/U ~ 89K) ~U TO ~D TBG STRING. 10:00 - 00:00 14.00 PULL COMP POOH & ~D COMPLETION STRING. 9/29/2000 00:00 - 03:30 3.50 PULL COMP FINISH PULLING OUT OF HOLE W/COMPLETION STRING. GOOD CLEAN CUT. RECOVERED 245 JTS + 19.22' CUT-OFF JT ~D CSG TOOLS & CLEAR FLOOR. 03:30 - 04:30 1.00 REST COMP LOAD PIPE SHED W/3 1/2" KILL STRING. TALLY SAME. ~U TO RUN TBG. 0~:30 - 08:00 3.50 REST COMP P/U 3 1/2" 8 RD EUE 9.~ TBG & RIH. ~N 72 JTS TL 2250.09' 08:00 - 10:00 2.00 REST COMP CLEAR FLOOR, POOH & STAND BACK KILL STRING. 10:00 - 13:00 3.00 REST COMP CLEAR OFF FLOOR AR~. ESTABLISH FLUID LOSS ~TE ( 8 BPH) WAIT ON RBP. 13:00 - 18:00 5.00 REST COMP ~U SCHLUMBERGER. RIH & SET RBP & 9990'. POOH. 18;00 - 19:00 1.00 REST COMP PRESSURE TEST RBP TO 3500 PSI FOR 10 MIN, OK. 19:00 - 19:30 0.50 REST COMP ~D SCHLUMBERGER. 19:30 - 20:30 1.00i REST COMP RIH W/3 1/2" KILL STRING. SET ~ 2278' 20:30 - 21:30 1.00 WHSUR COMP M/U & ~ND HANGER. TIGHTEN LOCK DOWN SCREWS. 21:30 - 22:00 0.50 WHSUR ~ COMP INSTALL & TEST ~C 22:00 - 00:00 2.00 BOPSU~ COMP N/D BOPE. 9/30/2000 00:00 - 02:30 2.50 BOPSUR COMP NU X-MAS TREE & ADAPTER F~NGE. TEST 5000 PSI, OK. PULL ~C. 02:30 - 03:30 1.00 BOPSU~ COMP ~U & REVERSE CIRCU~TE 80 BBLS OF DIESEL & FREEZE PROTECT WELL. 03:30 - 04:30 1.00 BOPSU~ COMP ~D HARD LINES & SECURE WELLH~D. 04:30 - 05:00 0.50 BOPSU~ COMP SET BPV. 05:00 - 06:00 1.00 BOPSU~ COMP ~D SECURE CEL~R. RELEASE RIG ~ 0600 HRS. Printed: 11/1/2000 10:17:53 AM ........ .. ::: :.~ :.:.~ ....... ..:~.....~ ::: :~.~: ::.~.:: ~:::~ ~.:...:: ...~.........::~.~.:~:::~.:::.~.~.~.~.~:: ~ ~::::~ .:_.:...::.::....:.:..:.: ..¥:~;~f~f~.~:;~?~: ~ :..':::~.-:.~ :~:~:.~:::~:~:.~..:::~:.. :..::::~ ~: ............. :::.:.: :::::::::::::::::::::::::: Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 1/13/1974 Event Name: WORKOVER Start: 1/'16/2001 End: Contractor Name: NABORS Rig Release: 1/24/2001 Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date : From- t° HOurs. Task:i:: :~:~:::i;; i::;:~i~:~i";; ::::::::::::::::::::::::::::i:.:!~:::.!:.!.i:.:?i~!i~!:;~!i:.?ii:.i::::.::!i:~:~::!6~i~i~!~!~:..~p~j:~:: :: :.;:'"! 1/16/2001 21:00 - 22:30 1.50 MOB PRE Scope and Lower Derrick 22:30 - 23:30 1.00 MOB PRE Move Rig from D-13a to A-07 23:30 - 00:00 0.50 MOB PRE Spot and Berm Sub, Pits & Pipe Shed 1/17/2001 00:00 - 01:30 1.50 MOB PRE Spot & Berm Sub, Pits, And pipe shed. 01:30 - 03:00 1.50 RIGU PRE Raise and scope derrick 03:00 - 04:30 1.50 RIGU PRE Spot and Berm Tiger Tank, Rig Up Lines to tree,& Tiger tank, Fill Pits with 8.5 ppg Sea water. 04:30 - 08:30 4.00 VVHSUR DECOMP Pick up Lubricator and attempt to pull BPV, Ice in tree, Pulling tool separated, bleed annulus down 08:30 - 10:00 1.50 WHSUR DECOMP Nipple down tree, retrieve pulling tool, ensure BP valve will move 10:00 - 14:00 4.00 VVHSUR DECOMP Nipple up BOP and lines 14:00 - 15:00 1.00 VVHSUR DECOMP Rig up Lubricator and pull BPV 15:00 - 16:00 1.00 VVHSUR DECOMP Install TWC valve and tested to 3,500 psi. Rig down lubricator 16:00 - 19:00 3.00 VVHSUR DECOMP Tested BOP equipment to 250 psi/3500 psi/annular 2500 psi BOP test witness waived by John Spaulding of AOGCC 19:00 - 20:00 1.00 VVHSUR DECOMP Pull TWCV. Pick up spear and make up same 20:00 - 20:30 0.50 VVHSUR DECOMP Pressure test lines to 3,000 psi. 20:30 - 22:00 1.50 VVHSUR DECOMP Displaced diesel from well bore to tiger tank. Pumped at 4 bpm rate at 200 psi. 22:00 - 00:00 2.00 VVHSUR DECOMP RIH with spear dressed with 3.947" grapple, attempted to spear 4 1/2" NSCT pup joint. Unable to fully engage grapple. Released and POH with spear. Picked up spear with 8" extension dressed with 3.001" grapple. 1/18/2001 00:00 - 02:00 2.00 WHSURi DECOMP Make up Spear No 2 dressed with 3.001" grapple and attempt to spear 3 1/2" tubing below hanger, no success. Laid down Idg jt. Picked up Spear No.1 dressed with 3.947" grapple ,4 3/4" drill collarand RIH and speared hanger and 4 1/2" NSCT pup it. Backed out Lock Down Screws 02:00 - 03:00 1.00 WHSUR DECOMP Pull hanger to floor. Pick up wt 27 K. Laid down hanger and spear. 03:00 - 05:00 2.001 PULL DECOMP Pull Out of the Hole with 24 stands of 3 1/2" Tubing 05:00 - 08:00 3.00! PULL DECOMP Made up retieving toll for 7" RBP and RIH with same on 3 1/2" tubing to 2247'. 08:00 - 15:00 7.00 PULL DECOMP Pick up XO from 3 1/2" 8 rd tubing to3 1/2" IF drill pipe. RIH while picking up 3 1/2" drill pipe to 9,990'. 15:00 - 15:30 0.50 PULL DECOMP Latched RBP, equalized, and pulled free. Dropped down 20' past set 3oint to confirm RBP was released. 15:30- 16:30 1.00 PULL DECOMP Circulated Bottoms Up. 16:30 - 23:30 7.00 PULL DECOMP Monitor well for flow. Pulled out of the hole while laying down 3 1/2" drill pipe. Losses to the hole 12 bbl/hr 23:30 - 00:00 0.50 PULL DECOMP Rig down floor and rig up to lay down 3 1/2" tubing 1/19/2001 00:00 - 02:00 2.00 PULL DECOMP TOH and Lay down 3 1/2" tubing 02:00 - 11:00 9.00 RUNCOI~ COMP Load pipe shed w/4 1/2" tubing -RU to Run 4 1/2" completion 11:00 - 00:00 13.00 RUNCOI~] COMP Held PJSM and TIH with 4 1/2" completion assembly to 7,800' 1/20/2001 00:00 - 03:30 3.50 RUNCOI~I COMP Run in hole w/4 1/2" completion assy. 03:30 - 05:30 2.00 RUNCOI~I COMP Rig up & circulate w/seawater. 5BPM @ 200 @ 200 psi. 05:30 - 07:30 2.00 RUNCOI~] COMP Space out tbg string. Tag up on old tbg stub. Slack off to engauge overshot on stub. Old pkr assy moving down hole. Pushed down 43 ft. 07:30 - 08:30 1.00 RUNCOI~I COMP Lay down 1 jt of tbg. M/U hanger & land same. (bottom of new completion @ 10073 ft.) 08:30 - 14:00 5.50 RUNCOI~] COMP R/U slickline equip. RIH w/3.75" drift, located 'X" nipples & bottom of completion, vvhen out bottom of completion string & pulled up. Old completion started slipping down hole while attempting to pull up into tail pipe assy. Old pkr assy slid down to 10463'. Could not get VV/L tools Printed: 1/26/2001 4:23:20PM Legal Well Name: A-07 Common Well Name: A-07 Spud Date: 111311974 Event Name: WORKOVER StaK: 1/1612001 End: Contractor Name: NABORS Rig Release: 112412001 Group: RIG Rig Name: NABORS 4ES Rig Number: 4ES Date From- To: ~ Hou: :r::s::~..:.:. :~Task::. ::' 1/20/2001 08:30- 14:00 5.50 RUNCO~ COMP free. 14:00 - 17:00 3.00 RUNCO~ UUNK COMP M/U Kinley cutter, drop & cut W/L. POOH. Left cuEer in hole, dropped off W/L while pulling out of hole. ~D slickline equip. 17:00 - 18:00 1.00 PULL OTHR COMP M/U landing jt & puli hanger. UD same. 18:00 - 00:00 6.00 PULL OTHR COMP POH while laying down 4 1/2" OR tubing to 6003' 98 its laid down 1/21/2001 00:00 - 09:00 9.00 PULL OTHR COMP POH while laying down 4 1/2" CR tubing. 09:00 - 10:30 1.50 FISH COMP Rig down 4 1/2" NSCT running equipment, rig down floor Icad pipe shed with drill pipe 10:30 - 11:00 0.50 FISH COMP Rig up floor to run 3 1/2" drill pipe 11:00 - 12:30 1.50 FISH COMP Pick up fishing tools and Make up fishing BHA dressed with 4 1/2" basket grapple and 5 7~8" OD overshot bowl 12:30 - 22:30 10.00 FISH COMP Trip in the hole while pi~ing up 3 1/2" drill pipe from pipe shed. Tagged fish at 10,377' and pushed down hole to 10,397' and engaged overshot. 22:30 - 00:00 1.50 FISH COMP Circulated boEoms up and monitored well. well static. Set back kelly 1/22/2001 00:00 - 06:00 6.00 FISH COMP Pull Out of the hole with 3 1/2" drill pipe, BHA and fish 06:00 - 07:30 1.50 FISH COMP Laydown fish and fishing BHA 07:30 - 08:30 1.00 CLEAN COMP Make up Cleanout BHA 08:30 - 09:00 0.50 CLEAN COMP RIH to 2100' 09:00 - 10:30 1.50 CLaN COMP Slip and cut drilling line 10:30 - 15:00 4.50 CLEAN COMP TIH to 111,654' 15:00 - 16:30 1.50 CL~N COMP Pick up Kelly and tag boEom wash and mamfmm 11,654' to 11,700' 16:30 - 00:00 7.50 CLEAN COMP POH and lay down 3 1/2" DP 1/23/2001 00:00 - 00:30 0.50 RUNCO~I COMP UD BHA. 00:30 - 03:30 3.00 RUNCO~! COMP LOAD 4 1/2" 0R-13 TBG IN PIPE SHED, TALLY SAME. 03:30 - 04:30 1.00 RUNCO~ COMP ~U TO RUN TBG. CHANGE TP ASSY. 04:30 - 06:00 1.50 RUNCOA COMP M/U TP ASSY W/WLEG & 'XN' NIPPLE. 06:00 - 00:00 18.00 RUNCOAI COMP RUN IN HOLE W/4 1/2" COMPLETION STRING. ~N 244 JTS. TL 9997'. (SEE COMPLETION REPORT) 1/24/2001 00:00 - 01:00 1.00 RUNCOA COMP M/U HANGER & ~ND SAME. RILDS. P/U ~ 103K, SIC 80K. 01:00 - 02:30 1.50 RUNCOA COMP ~U & REVERSE ClRCU~TE INHIBITOR IN PKR ANNULUS. 3 BPM ~ 250 PsL 02:30 - 04:00 1.50 RUNCO! COMP DROP BALL & ROD. WAIT TO S~T IN NIPPLE. A~EMPT TO PRESSURE UP & SET PKR. BALL NOT SEATED. 04:00 - 06:00 2.00 RUNCOI COMP WAIT ON SLICKLINE EQUIP. 06:00 - 10:00 4.00 RUNCOI COMP ~U SLICKLINE EQUIP. RIH W/3.6" BELL GUIDE & PUSH BALL TO SEAT IN 'XN' NIPPLE. 10:00 - 11:30 1.50 DHEQP COMP PRESSURE UP & SET PKR. TEST TBG TO 3500 PSI, 30 MIN, OK. BLEED OFF TBG TO 1500 PSI. PRESSURE UP ANNULUS TO 3000 PSI & HOLS FOR 30 MIN, OK. BLEED OFFF TBG & SHEAR RP VALVE. 11:30 - 12:30 1.00 REST COMP ~D SLICKLINE EQUIP & INSTALL ~C IN HANGER. 12:30- 14:30 2.00! RIGD COMP N/D BOPE. 14:30 - 15:30 1.00 RIGD COMP N/U X-MAS TREE. 15:30 - 16:30 1.00 RIGD COMP PRESSURE TEST X-MAS TREE & HANGER VOID TO 5000 PSI. 16:30 - 18:00 1.50 RIGD COMP ~U LUBRICATOR & PULL ~C. 18:00 - 20:30 2.50 RIGD COMP REVERSE ClRC 105 BBLS DIESEL TO FREEZE PROTECT WELL. 2 BPM ~ 1400 PSI. 20:30 - 21:30 1.00 RIGD COMP INSTALL BPV. 21:30 - 22:00 0.50 RIGD COMP CLEAN CEL~R & SECURE WELL. RELEASE RIG ~ 2200 HRS, 1-24-01. Printed: 1/26/2001 4:23:20 PM '3 0 ? E; 5, '} '72 7 ! 7 12/12/96 To: Blair Wondzell P! Supervisor R~: Water & Gas to Su~ace ~ BPX PBU A-Pad -- . · We got the gas sample analogous back from the lab and it ~s confirmed - that the sample ~s Li~ Gas and not MI. .___ Lift gas was shut off in the five wells one at a time, when the LG in well A- 7 was shut-in and the IA bled off, the gas bubbling and water in all cellars subsided. It took about 3 hours for the water to evacuate the cellar in A-5. ! wen~ back to the Pad at about 6:00 PM, there was no water in any of the-"'~ellars however there was gas still bubbling up in A-5 & 40 cellars. The injection rate on well A-Si had been brought back up to 3350 psi, and all annuli were bled to 100 +/- psi. The gravel inside and outside of the cellars of A-___5~4_.0 & 4_3 had subsided about 24" this subsidence extended about two foot around the outside of the weilhouses. Tomorrow 12/13/96 we will simulate the same condJtions that existed w~en the flow to surface commenced, if A-7 will continue to flow ali night without LG. This should confirm or deny that A-~ the fault of this flow. I will write a real report to you and David after we have the final results of tomorrow's simulation. This is just a FYI to keep you up to speed on the issue. If you have any other questions you need answered please call me at 448-1227 or page me and I will do my best to answer them for you. Doug Amos RECEIVED L')EC I $ 1996 Alaska 0il & G3s Cons. Commission Memorandum Production Supt. ~a~,,: 12111196 Ken Smith, N.S.P.E subj.=: A,-Pa~d Fresh W, iater/Gas Production in Cellars The following is a chronological break down of events on A-Pad involving wells A-5, A~7, A-Si, A-40 and A-43. Date: Daily events 1¢6-96 1¢:8-96 1~-9-96 GC-3 produced water system was shut down for 18 hours for repairs in skid 301. Subsidence was reported in well house of Well A-43. Well A-08i was converted from produced water(PW) to :" .'. miscible injection (MI). This is the first time A-08i has been · on miscible injection. The following readings were on produced water. FWHP:1050psig, FWRT: 140deg F, IA: 100psig, CA: 560psig 1¢,.10-96 A-pad & X-pad went down due to logic problems, ali wells were down for 5 hours. A-08i well readings on MI; WHP:3350 psig, WHT: 130 deg F, IA: zero, CA: zero The night Pad Operator found standing water in the cellar in well A-7. The day Pad Operater found flooding with gas bubbling in well houses A-43, A-40, and A-5 cellars. LEL readings are found to be as high as 30% in cellar but only a traCe inches above cellar. Twenty four hour man watch initiated by Production Engineers. Samples of w~ter taken by BPX lab and found to be fresh at 1000 ppm chlorides. Area has been roped off and access restricted. Peak vac truck brought on location and sucking down cellars as needed. Alaska 0il & C:~s Cons. knchcr~.g0 Miscible Injection was shut in on well A-Si. No effect was found on offset wells. Well was brought back on at half rate to monitor watt integrity. A-Si casing pressures remain at zero. 10-11-96 Night pad operator reported major subsidence plus water/gas in Well A-43 well house. Well A-5 has major gas/water production. Gas samples taken from Well A-5 cellar by BPX lab. Vac Truck recovered 1000 bbls of water from cellars. Watedgas production has ceased in Well A-7. Wells A-43 and A-40 have subsided by 30%. Well A-5 watedgas production continues unchanged. Waiting on gas analysis. Vac truck ceases liquid recovery but remains on location with man watch. Subsidence of wails in question since September 1996: A-07: None A-05: 4 yards of gravel A-40: 10 yards of gravel A-43: 62 yards of gravel Note: Previous records could not be found by subsidence crew. Night Pad Operator reports conditions are improving. Area remains restricted and man watch continues. Please find attached the pad map, Pad Operator's daily readings and comments. Course of action and Interpretation. Continue to monitor wells and sample liquid and gas production for possible well integrity failure, At this time a suspected failure of well Integrity is not warranted. The source of the fresh water is assumed to be from known underground streams which were documented prior to pad construction in the early 1970's. The suspected cause of the problem is continued melting of the permafrost by each wells proximity and the migration of gases known to exist in and under the permafrost. · Alask.3. 0it & ¢ ~mS Cons. FLARE PIT WELL PAD A Illlll as of July, 1996 ]]111 Illlilllllli)lill~ltllllltlllll}ll~llilllllillllllllllllilllllSV _J '-'I2GCC '-~kOF'E :i'lri,iT SUMP 39 TO D PAD · ~8 SEWAGE ~92 SWi IEOH [] WELL AND 6' PRODUCTION LINE · ~. WELL, 6' PRODUCTION UNE, AND 3' GLT LINE · WELL, 6' WSW LINE, AND 4' MI LINE O WELL, 4' PRODUCTION LINE, AND 3' GLT LINE · SUBSIDENCE WELL '~' GLT'rWINS:WELLS A-41 & A-34A A-23 & A-24 ^-9 & A-39 A-2 & A.-4 M! TRUNK & LATERAL: WELLS A-3 & A-51 A-11 & A-35 / A-16 & A-31 / A-21 & A-27 O CELLAR ONLY I~ PRODUCTION & GLT TWIN: A-P_;?. & A-.42 -~' WSW TWIN ITl WELLHEAD AND CELLAR 0il & G~.s Cons. LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 23 March 1995 Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL 7~-09 (44-03-11-13) .... 07.. ( 12-26-11-13 ) DESCRIPTION 1 PDK FINAL BL+RF 1 PLS FINAL BL+RF 1 CN/GR/CCL FNL BL+RF 1 GR/CCL FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 926 06 4824.02 5617.10 5953.08 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and ~,~turn Petrotechnical Data Ce~te~ BP F~:plcr~:.'t !on 900 ~'~,~3 ~ :,-.: s on Received APR.. Alaska 0ii & Gas Cons. Commission Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 26 July 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PL STATIC FINAL BL 1 PL STATIC RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PL STATIC FINAL BL 1 PL STATIC RF SEPIA 1 PL STATIC FINAL BL 1 PL STATIC RF SEPIA ECC No. Run # 1 3924.02 Run # 1 Run # 1 6170.05 Run # 1 Run # 1 Run # 1 5665.07 Run # 1 6163.01 Run # 1 Run # 1 4824.01 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 ~~ /~. Rodney D. Paulson Please sign and return to: Petrotechnical Data Center BP Exploration (Alaska) Ine 900 East Benson Boulevard Anchorage, Alaak~ Date STATE OF ALASKA , ~ ~ o,.,,,,,,:, IGINAI. REPORT OF SUNDRY WELL OPERATIONS" 1. Operations performed: Operation shutdown Stimulate_J_ Plugging Perforate X Pull tubing Alter casing Repair well . Other. 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 64.69 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM At top of productive interval 2600' NSL, 198' EWL, SEC,. 26, T11N, R13E, UPM At effective depth 2681' NSL, 204' EWL, SEC,. 26, T11N, R13E, UPM At total depth 2725' NSL, 206' EWL, SEC,. 26, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 11899 feet BKB 9068 feet 11804 feet BKB 8984 feet Casing Structural Conductor Surface Intermediate Length .. 100 2679 8455 8. Well number A-07 (12-26-11-13) PBU 9. Permit number/approval number 73-41 / 10. APl number 50- 029-20131 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) X-plug in XN nipple at 11806' fi//at 11804' (07/90) Size Cemented Measured depth True vertical depth BKB 20 145 sx 119 119 13 3/8 3250 sx 2698 2698 9 5/8 2275 sx 2107- I ~)5i,,~ 2107"7~i~ Production Liner Perforation depth: 2099 1866 measured Sag R: true vertical subsea: Tubing (size, grade, and measured depth) 10 tieback string 2118 2118 7 850 sx 10028-11894 7631-9066 11510'- 11544' Ivishak: 11642'- 11681', 11664'- 11699', 11709'- 11756', 11766'-11796", 11810'-11835' 8665'-8693' (Sag R.) 8777'-8947' (five Ivishak intervals) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119' Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9983'; 7" Otis WD packer at 11796'; 4 1/2" SSSVat2157' i3. Stimulation or cement squeeze summary see attachment ~ E ~ E I V E L) 14. Intervals treated (measured) J U L 2 1 199; Treatment description including volumes used and final pressure Alaska 0ii & Gas Cons. Commission Representative Daily Average Production or In!ecti0n D~,ta ~-,;';,C~6;'~.~ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 420 1666 340 1668 251 2220~ 3532 1131 1189 249 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil Y~ Gas .. Suspended . 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. . Signed (~~,~ (~.~) '-~~ Title SeniorTechnica/Assistant, Form 10-404 Rev 06/15/88 Service SUBMIT IN DU~LICV'ATE "~ 1/10/92 1/18/92 1/26/92 WELL A-07(12-26-11-13) NRWO/Reperf/Frac A NRWO was performed using the following fluids: 410 bbls PW to Load Well 5 bbls EW 95 bbls ACID 111 bbls PW 5 bbls EW(Preflush) 22 bbls Cement 10 bbls EW(Spacer) 30 bbls PW 33 bbls DUO Polymer(Contaminant) 35 bbls PW(Displacement) 315 bbls PW(Reverse Out) 51 bbls PW(Inj Test and Pooh) 36 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 11782' 650 bbls load fluid behind pipe 12 bbls cement recovered(does not include cement not pumped) ACID: 15% HCL W/10% XYLENE, 1% WS-36, .4% HAI-85, 45 PPT FERCHEK-A CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2% CFR-3,016% HR-12, .12 GAL/SK HALAD-344 L SQUEEZE #1 A NRWO was performed using the following fluids: 175 bbls PW 49 bbls PW Jet Pass 5 bbls EW(Preflush) 22 bbls Cement 24 bbls EW(Spacer) 32 bbls Duo Polymer(Contaminant) 1 bbls PW(Displacement) 30 bbls PW(CMT Contamination) 231 bbls PW(Reverse Out) 49 bbls PW(Jet Pass) 36 bbls PW(Final Reverse Out) 49 bbls Recovered(N2 Displacement) 37 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 11730' 15 bbls Cement Recovered CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2% CFR-3, .12% HR-12, .15 GAL/SK HALAD-344L SQUEEZE #2 The following intervals were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11641'- 11681' MD RECEIVED d U L '~ 1 199~ Alaska Oil & Gas Cons. Commission Anchorage PAGE 2 2/13/92 8/09/92 8/12/92 8/16/92 8/18/92 Oh 7/16/93 WELL A-07(12-26-11-13) A Hydraulic Fracture treatment was performed uisng the following fluids: 150 bbls PAD W/567 Gal ESL(9%) 42 bbls 1 PPG 16 bbls 2 PPG 22 bbls 3 PPG 25 bbls 4 PPG 29 bbls 5 PPG 30 bbls 6 PPG 31 bbls 7 PPG 32 bbls 8 PPG 33 bbls 9 PPG 112 bbls 10 PPG 196 bbls 50# Gel Flush The following intervals were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11641' - 11674' MD A REFRAC was performed using the following fluids: 10 bbls 40# Gel Prepad to Establish Rate 150 bbls 40# X-Link Gel Pad 506 bbls Frac Clean Volume 102 bbls 20# Linear Gel Flush The following intervals were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11524' - 11544' MD 11510' - 11524' MD A Sag Frac was performed using the following fluids: 10 bbls 40# Gel Prepad to Establish Rate 228 bbls 40# X-Link Gel Pad W/0% ESL ~ 17 Dirty i PPG 22 Dirty 2 PPG 29 Dirty 3 PPG 34 Dirty 4 PPG 37 Dirty 5 PPG 40 Dirty 6 PPG 42 Dirty 7 PPG 480 Dirty 8 PPG 196 Dirty 20 #Linear Gel Flush R ¢ iVED Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03-03-93 T# 84406 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-07~w~~~CH F-39~CH K-06~CH M-31__~~CH N-14~~_CH N-16~CH S-33~~_~CH x- ~ 4~ 02/23/93 REF#124752 02/22/93 REF#124751 02/23/93 REF#124673 02/24/93 REF#124674 02/26/93 REF#124801 02/25/93 REF#124675 02/25/93 REF#124754 02/24/93 REF#124753 PRODUCTION LOGGING SERV ATLAS PRODUCTION LOGGING SERV ATLAS COLLAR LOG (CHEMICAL CU ATLAS PFC GAMMA RAY (PERFORAT ATLAS PFC GAMMA RAY (PERFORAT ATLAS PRODUCTION LOGGING SERV ATLAS PRODUCTION LOGGING SERV ATLAS PFC/CCL (PERFORATION RE ATLAS Information Services Well Records AJaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/30/92 T# 84191 BP/ PBU CH (PRODUCTION) LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-07 PERF A-24 ~Z' ?O PERF N-2 1 ~ ~..~ PERF 09/08/92 #1 06/25/92 #1 09/25/92 #1 09/28/92 #1 9854.00-11648.00 HALIBUR 5 " 10800.00-11306.00 HALIBUR 5 " 8724.00- 9355.00 HALIBUR 5 " 10900.00-11208.00 HALIBUR 5 " Information Control Well Records EIVE. D JAN 0 4 199 Naska 0ii & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/27/92 T# 84002 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-07 ~o$t PER~O~..~ ~o~O08/16/92 #1 ~'/ N-09 ~'7~ PERF ~, 07/23/92 #1%,/ 9800.00-11524.00 HALIBUR 10 " 9100.00- 9400.00 HALIBUR 10 " Information Control Well Records R CEIVED OCT 2 9 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exl~loration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 3 DATE: 02/03/92 T~ 83229 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-01 ~g~ COMPLETION A-07 ~3- ~/ COMPLETION D-19 ~2-~t ~D~-P 01/23/92 91 01/25/92 #1 01/26/92 91 01/24/92 91 10400.00-10610.00 SCH 9450.00- 9699.00 SCH 11400.00-11689.00 SCH 8800.00- 9480.00 SCH 5 " 5 " Information Control Well Records Adrian J. Martin RECEIVED FEB ~ 2 1992 Alaska 0il & C=as Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/28/92 T9 83212 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 01/05/92 01/11/92 01/15/92 01/02/92 12/31/92 01/14/92 01/18/92 9792.00-10683.00 HLS 9840.00-11790.00 HLS 9750.00-10082.00 HLS 9156.00- 9770.00 HLS 9100.00- 9750.00 HLS 9001.00- 9205.00 HLS 1740.00-10602.00 HLS ~ 5 " 5 " 5 " 5 " 2 " Information Control Well Records Adrian J. Martin RECEIVED · FEB 1 2. 199Z Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, A4,~.ka 99519-6612 (907) 561-5111 DATE: 01/16/92 T# 83187 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 12/28/91 #1 ~ ~ PROD-F ~%-I GAS LIFT SURVEY 12/26/91 #1 25 ~'!, TEMP 12/26/91 #1 .~-ID"~ ~L~ PITS 12/30/91 #1 ~-17A~I'II~GAS LIFT SURVEY 12/25/91 ~1 5 " -24 J[~L~Y 12/28/91 ~~ 5 " 9800.00-11774.00 CAMCO 5 " 7580.00-10455.00 CAMCO 2 " 8500.00- 9462.00 CAMCO 5 " 2000.00-10229.00 CAMCO 2 " 350.00- 9467.00 CAMCO 2 " 8500.00-10200.00 CAMCO 2/5" 8500.00- 9462.00 CAMCO 5 " 2000.00- 9984.00 CAMCO 2 " 8700.00- 9740.00 CAMCO 5 " 8500.00-10200.00 CAMCO 8500.00- 9462.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED JAN 1992 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION TO: DISTRIBUTION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 Dar3:03/07/91 !.82217 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-07 PLS 03/03/91 F-46 PDK-100 02/27/91 F-46 SBL 02/27/91 M-26 PLS 03/02/91 W-31 CNL 02/28/91 #1 #1 #1 #1 #1 10320-11750 Atlas 5" -8700-9520 Atlas 5" 8420-9510 Atlas 5" 10820-11554 Atlas 5" 11200-11901 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES t ECEIVEb MAR 1 ~ 1991 Alaska Oil & Oas Cons, Anchorage Commission STATE OF ALASKA A~,~ OIL AND GAS CONSERVATION COMM~,~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_._ Stimulate x Plugging Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska~ Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM At top of productive Interval 2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM At effective depth 2681' NSL, 204' EWL, SEC. 26, T11N, R13E, UPM At total depth 2725' NSI, 206' EWL, SEC. 26, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11899feet true vertical BKB 9068feet Repair well 5. Type of Well: Development Exploratory Stratigraphic Service Plugs (measured) Perforate x Other 6. Datum elevation (DF or KB) KBE = 64.69 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A~07 (12-26-11-13) PBU 9. Permit number/approval number 73-41/90-176, 90-547 10. APl number 50- 029.20131 11. Field/Pool Prudhoe 0il Pool X-plug in XN nipple at 11806' Effective depth: measured 11804feet true vertical BKB 8984feet Junk (measured) fill at 11804' (07/90) Casing Length Size Cemented Structural --. Conductor 100 20 145 sx Surface 2679 13 3/8 3250 sx Intermediate 8455 9 5/8 2275 sx Production 2099 10 3/4 tieback string Liner 1866 7 850 sx Perforation depth: measured Sag R: 11510'- 11544' Measured depth True vertical depth BKB 119 119 2698 2698 2107.1 2107-7 2118 2118 10028-11894 7631-9066 Ivishak: 11642'-11681', 11684'-11699', 11709'-11756', 11766'-11796', 11810'-11835' true vertical subsea: 8665'-8693' (Sag R.) _ 8777'-8947' (five Ivishak intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119' 13. Stimulation or cement squeeze summary see attachment 1'4, Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9983'; 7" Otis WD packer at 11796'; 4 1/2" $SSV at 2157' RECi:Iv u Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure JAN 1 8 1 Alaaks Oil & Gas Cons. Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run L . Daily Report of Well Operations X 770~' 846 1212 1664 767~'~ 868 1258 1696 16. Status of wellclassificaion as: Oil X Gas Suspended.. Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10404 Rev 06/15/88 262 295 SUBMIT IN DUPLICATE WELL A-07 (12-26-11-13} PBU PLUG-BACK/STIMULATION/ADD. PERF OPERATIONS 5/18/90 5/24/90 5/27/90 7/18/90 Set X-plug in XN nipple of the WD packer. Plugged back to a depth of 11769' with 900# sand. Set CTU inflatable bridge plug at 11611' and acidized Zone 4 perfs with 176 bbls. 15% HCl w/diverter in four stages. Unseated packer and displaced with diesel. Left plug in XN nipple and returned well to production. Rigged up Schlumberger and perforated the following additional intervals using 3 3/8" carrier guns at 4 spf: 11510'- 11522' MD BKB (Sag R.) 11716'- 11726' MD BKB (Ivishak) Returned well to production and tested. jam 1/1 1/91 i E EIVED Alaska.Oil & Gas Cons. Commission "Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. 'Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/26/90 T#:81439 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-07 PERF 07/18/90 #1 11400-11762 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS R ES ER.V. OE~...----;~..- ARCHIVES RECEIVED JUL ~ Alaska0il & Gas 00ns. uor~mission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 06/13/90 T8:81295 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-07 GR 05/25/90 81 9800-11769 CAMCO 5" A-08 INJ 05/23/90 81 9500-9869 CAMCO 5" B-11 PROD-F 05/24/90 81 10800-11149 CAMCO 5" F-21 PROD-F 05/26/90 81 11300-11604 CAMCO 5" N-16 PITS 05/28/90 81 9400-10325 CAMCO 5" Q-06 PROD-F 05/25/90 81 10900-11390 CAMCO 5" T-07 INJ 05/26/90 81 9100-9550 CAMCO 5" Distribution: ARCO CHEVRON EXXON GEOSClENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES *b%go'/ BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :06/08/90 T#:81255 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. Well Records at (907) 564-4445. A-07 GR 05/18/90 #1 R-13 PERF 05/18/90 #1 W-07 GR 05/16/90 #1 W-07 PERF 05/16/90 #1 If you have any questions, please contact BP 11500-11803 HLS 5" 9600-9900 HLS 5" 13600-14500 HLS 5" 13600-14500 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR_ ----... ~'T'A-TE OF ALA-C~E;a[~J ARCHIVES ,~/a~/e .,..,JlJtV 18 1990 u// & eas Con° 1. Type of Request: STATE OFALASKA ~...~ 0 ~ !~ "~'--'-'ALASKA OIL AND GAS CONSERVATION COMMISSION ,~ APPLICATION FOR SUNDRY APPROVALS Abandon Suspend Operation Shutdown Re-enter suspended well Alter casing ~ Repair well __ Plugging Time extension Stimulate ~ Change approved program Pull tubing Variance ,, Perforate x Other 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1700' SNL, 922' WEL, SEC. 35, T11N, R13E, UPM At top of productive interval 2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM At effective depth 2573' NSL, 5034' EWL, SEC. 26, T11N, R13E, UMI At total depth 2725' NSL, 206' EWL, SEC. 26, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 11899 feet true vertical BKB 9068 feet 5. Type of Well: Development x Exploratory . Stra~graphic__ Service 6. Datum elevation (DF or KB) KBE = 64.69 ' AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number ~A-07 (12-26-11-13) PBU Plugs (measured) 9. Permit number 73-41 10. APl number 50- 029-20131 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 11759 feet Junk (measured) fill at 11818' true vertical BKB 8944 feet Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 100 20 145 sx 119 119 Surface 2679 13 3/8 3250 sx 2698 2698 Intermediate 8455 9 5/8 2275 sx 2107-10562 2107-79 Production 2099 10 3/4 x 9 5/8 tieback st/~ng 2118 2118 Liner 1866 7 850 sx 10028-11894 7631-9066 Perforationdepth: measured Sag R: 11522'-11544' lvishak: 11642'-11681', 11684'-11699', 11709'-11716', 11726'-11756; 11766'-11796', 11810'-11835' true vertical subsea: 8674'-8693' (Sag R.) 8777'-8947' (six ivishak intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119' Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 99833 7"Otis WDpackerat 11796; 4 1/2" SSSV at 2157" 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation July 1990 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Supervisor Waterflood/Miscible Flood FOR COMMISSION USE ONLY Conditions of approval: Notify ~mmission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- Date ? Approval No. Approved by order of the Commission Form 10-403 Rev 06/15/88 Commissioner Date Approved Copy Rflturned SUBMIT TRIPLICATE WELL A-07 ADD'L. (12-26-11-13) PBU PERFORATION We propose to perforate the following additional intervals during July 1990: 11510' - 11522' MD BKB 11716'- 11726' MD BKB Depths are referenced to BHCS, 2/12/74. A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. 1~:7/11/90 · . o FLOW TUBES & PACKOFF _ GREASE SEAL FLOWTUBE FL GREASE LINE FLOWLINE VALVE "--~~_~ BOWEN"'rACKOFF HAND PUMP GREASE //' "MANIFOLD ~~,~ GREASE RISER BOP ..,..-GREASE RESERVOIR BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 27, 1990 Alaska Oil & Gas Conservation Commi~sion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton ~ ~Well 'A~7' (12'26-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustainment work on the well. Yours,very t ruly~/,~ ,~ B. J. Policky ~ Supervisor Waterflood/Miscible Flood BJP: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File 1, Type of Request: STATE OF ALASKA ~_,,,,~KA OIL AND OAS CONSERVATION COMIV~. i.,..~ON 0 ~ APPLICATION FOR SUNDRY APPROVALS; Abandon.. Suepend Operation Shutdown ~: Re-enter suspended well Alter ~a~lng RapaJr well Plugging ~ Time extension... Stimulate X Change approved program Pull tubing Variance ~ Perforate ~ Othe~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99819-8612 4. Location of well at surface 1700' SNL, 922' WEL, SEC,. 35, T11N, RI3E, UPM At top of productive Interval 2600' NSL, 198' EWL, SEC. 26, T11N, R13E, UPM At effective depth 2688' NSL, 203' EWI., SEC. 26, T11N, R13E, UPM At total depth 2725' NSL, 206' EWL, SEC,. 26, TI IN, RI3E, UPM 12. Present well condition summary Total depth: measured 11899 feet true vertical BKB 9068 feet 5. Type of Well: Development X Exploratory,, Stratigraphio Service Plugs (measured) 6. Datum elevation (DF or KB) KBE = 64.69 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-07 (12-26-11.13) PBU 9. Permit number 73-41 10. APl number 50- O29-2O131 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 11818 feet true vertical BKB 8996 feet Junk (measured) fill at 11818' Casing Length Size Structural -- Conductor 100 20 Surface 2679 13 3/8 Intermediate 8455 9 ~8 Production 2099 10 3/4 x 9 ~/8 Liner 1866 7 Perforation depth: measured Sag R: 11522'- 11544' true vertical subsea: Cemented Measured depth True vertical depth BKB 145 sx 119 119 3250 sx 2698 2698 2275 sx 2107-10562 2107-7 tieback string 2118 2118 850 sx 10028-11894 7631-9066 Ivishak: 11642'-11681', 11684'-11699', 11709'.11716', 11726'-11756', 11766'-11796', 11810'-11835' 8674'-8693' (Sag R.) 8777'-8947' (si~ Ivishak intewals) ECEJVED Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9983' with 4 1/2" tailpipe to 10119' Packers and SSSV (type and measured depth) 9 ~'8" BOTpacker at 9983'; 7" Otis WD packer at 117c~S!~a 0ii & GaS 4 1/2" SSSVat 2157' 13. Attachments Description summary of proposal 3( Detailed operations program ... BOP sketch 14. Estimated date for commencing operation J March/April 1990 16. If proposal was verbally approved Oil X Gas ~ Name of approver Date approved Sewice 17. I hereby certify that the foregoing i~ue.,and ~)rrect to the best of my knowledge. Si~lned ~ Y_.~~ Title Supervisor Waterflood/Miscible Flood ./ ~' FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integr~ Test Subsequent form required 10-"~--.~-c~)// ORIGINAL SIGNED Approved by order of the Commission BY LONNIE C. SMITH Form 10-403 Rev 06/15/88 15. Status of well classification as: Suspended ,.,. JApprova~ No. ct,O .- I ?~ Commissioner Date ~-.z- ?~ SUBMIT IN TRIPLICATE Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams Chicksan (Kill Line) Slips ~-~ Pipe Rams Pump-In Sub (Circulate/Returns) W ell Hoad Swab V alv~i~;ka Oil & Gas Cons. Anchorag0 A-07 PLUG BACK AND CTU HCL JOB , . . . . . . RU slickline and pull the SSSV. RIH with a maximum size drift and a TEL. Ensure no obstruction exists in weilbore and tag PBTD. Last tag was 11812' on 6/1/87. Set X-plug in the XN nipple of the WD packer. Dump 2 bailers full of CaCO3 sluggets on the plug. Obtain a well test for informational purposes only. Obtain wellhead sample. Using the API.;RP 42 emulsion testing procedures, test emulsion tendencies when mixing a wellhead fluid sample with live and spent 15% HCL (with additives) at 180 deg F. Test with 5000 ppm ferric ion added. Adjust the type and volumes of additives as dictated by the emulsion test results. Plug back to a depth of 11756' with 40-70 sand. If TD has not changed from the 6/1/87 tag, 892 lbs will be required to fill the 40' ( @22.31 lbs/lin ft.). After six hours rig up slickline and RIH with TEL and tag PBTD. Acceptable range for sand top is 11754' to 11764 '. If sand top is not in this range, proceed with action required to establish sand top in this interval. After sand top is at the desired depth, rig up for a CTU acid job. Ensure a check valve is installed between the well and pump van. Isolate SSSV. RIH with CTU and inflatable bridge plug and set the BP in the 98' blank interval between 11544' and 11642' MD. Acidize 90 ' (360 holes) of Zone 4 perfs with 7200 gals 15% HCL acid and additives shown on attached page. Maximum pressure is 4000 psi. Filter fluids to 3 microns. Pump as follows: 1) 2) 3) 4) 5) 6) 7) 9) 10) 1800g 15% HCI 1/3 diverter stage (120 lbs. = 1.0 ppp) 1800g 15% HCI 1/3 diverter stage (120 lbs. = 1.0 ppp) 1800g 15% HCI 1/3 diverter stage (120 lbs. = 1.0 ppp) 1800g 15% HCI Unseat packer and reciprocate across perfs. 1800g arctic diesel with 10% mutual solvent Displace to perfs with diesel 10. Rig down CT. Leave plug in WD packer. Return well to production and obtain maximum rate test. CLL 3/16/90 S~ondaKI Alaska PToduction C~mpany%._,.?-"/ 900 Eost Ben$on Boulevard P.O. Box 196612 Anchorage. AIoska 99519-6612 t907) 564-511 I TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED · STANDARD ALASKA PRODUCTION Date: 06/18/87 TI: 77970 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this offlce: A-3 A-7 B-13 B- 23 E-11 U-5i R- 23 Injection Profile 06/02/87 #1 11000-11963 Camco 5" F1 owme her WHUT 06/01/87 #1 11450-11808 Camco Injection Profile 06/0 2/87 #1 ' 10500-10853 Camco 5" CCL-GR 06/05/87 #1 9880-9882 Camco 5" WOPITS 06/5-6/87 #1 ,10300-10740 Camco 5" Injection Profile 06/05/87 #1 - 8750-9437 Camco 5" WOPITS 06/04/87 #1 11 200-1 2118 Camco 5" Received Date Plack a I NFORMAT I ON CONTROL Wel I Records LR2-1 A unit of the o~iginol Stondo,d CM Compony Founded in Clevelond. Ohio. ,n 1870 Production Company 900 Eosf Benson Bo:," PO Bo. 196612 Anchorage, AIo sk o ~,~m'jq~ (907) 564-511 I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 06/04/86 TO: MOBIL r~: 77083 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASFZ PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and retur'nlng It to thls office: A-7 Temp. 05/17/86 #1 3100-9950 Camco 5" A-34A Spinner 05/19/86 #i 8850-9i50 Camco 5" B-16 Temp./GLM 04/16/86 #1 9500-9700 Camco 5" B-23 WOPITS 05/21-22/86 #1 9300-9900 Camco 5" F-24 Spinner 05/03/86 #2 11900-12300 camco 5" N-20 Cont. Flow Survey 05/06/86 #1 9800-10100 GO 5" N-22 Spinner 05/14/86 #1 10450-10700 Camco 5" R-5 Temp/Spin 04/29-30/86 #2 8900-9200 Camco 5" R-7 Injection Profile 04/30/86 #1&2 9600-10200 GO 5" R-9 Pump-in Temp. 04/27-28/86 #1 8200-9712 Camco 5" S-5 Pump-in Temp. 04/30/86 #1 10100-10550 Camco 5" X-24 Injection Profile 05/02/86 #1 9200-9620 Camco 5" Rece i ved Date ~J~ ~ I Victoria Aldridge LR2-1 ~ INFORMATION CONTROL ; ': Well Records LR2-1 f(,,,,,d,.cl ,,, Cl~,.eh..I (.)h,~ ,,: lEI/() Standard Alaska Production Company · 900 East Benson Boulevo~,,~,~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) .564-5111 April 28, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well A-7 (12-26-11-12) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our sub- sequent report of perforating this well. Yours very truly, PFB: JAM ~ P. F. Barth Supervisor, Reservoir/Production Surveillance Unit I . Enclosures (4) cc: Drilling Well Files (MB12-1) Well Records (LR2-1) A-7 Well FiLe RECEIVED APR2 9 1986 Alaska 0il & Gas Cons. Commission Anch0r~ge A unit of the original Standard Oil Co,'npany Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA 'L AND GAS CONSERVATION COMMI,(i"ON REPORT SUNDRY WELL OPB'(ATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate .~ Pull tubing Alter Casing - Other ~ . . 4. Name of Operator STANDARD ALASKA PRODUCTION COMPANY Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Location of well at surface 922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM At top of productive interval 201' EWL, 2624' NSL, Sec. 26, TllN, R13E, UPM At effective depth (not available) At total depth 206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM 5. Datum elevation (DF or KB) [<;BE = 64.69 6, Unit or Property name Prudhoe Bay Unit 7, Well number A-7 (12-26-11-13) PBU 8. Approval number N/A 9. APl number 50-- 029-20131 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 11899 feet Plugs (measured) 9068 feetBKB Feet Effective depth: measured 11864 feet Junk (measured) true vertical 9040 feet BKB Casing Length Size Cemented Structural -- Measured depth True Vertical depth BKB Conductor 55 ' 20" Surface 2653' 13 3/8" 3250 sx Intermediate 8455' 9 5/8" 2275 sx 9 5/8"x10 3/4" tieback ~IX:~:;IX~N~[~ 2073 ' string Liner 1866' 7" 850 sx Perforation depth: measured 11522'-11544' (one Sag R. interval) 11642 '-11835' (six Ivishak intervals) true vertical f ~ubsea) 8674 '-8693r 8777 ' -8947 ' Tubing (size. grade and measured depth) 4 1/2" L-80 to 9983' with 4 1/2" tailpipe to 10119' Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 9983' 100' 2698' 2107-10562' 2118' 10028-11894' 100' 2698' 2107-7988' 2118' 7631-9066' ; 7" WD packer at 11796'; 4 1/2" Otissssv at 2157' 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure APR 2 9 1986 Aiask~ 011 & Gas Cons, 13. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf wateroBbI Casing Pressure Tubing Pressure Prior to well operation 2260 1792 691 0 222 Subsequent to operation 3310 2044 649 0 234 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run i~' 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10.404 Rev. 12-1-85 Submit in Duplicate PERFORATING DATA - Well A-7 (12-26-11-13) PBU 4/10/86 Pulled SSSV from ball valve nipple at 2157'. 4/11/86 Installed and tested lubricator to 3500 psi for all well work. Rigged up Dresser Atlas and perforated the following additional intervals using 3 1/8" carrier guns at 4 spf: 11522' - 11544' MD BKB (8674' 8693' TVDss)~~-4~' 11642' - 11681' MD BKB (8777' - 8811' TVDss) All depths are referenced to BHCS/GR, 2/12/74. (Note: Due to an operational depth control problem, the intervals are 5' deeper than those proposed in the original Sundry Notice.) Put well on production. 4/22/86 Reset and tested the SSSV in ball valve nipple at 2157'. Well on production. jm 4/23/86 SOHIO ALASKA PETROLEUM COMPANY ..... 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 March 11, 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 kttn: Mr. C. V. Chatterton Well A-7 (12-26-11-13) PBU Gentlemen: Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to perforate the well. Very truly yours, PFB: JAM~ Enclosures (3) cc: Drilling Well Files (MB 12-1) Well Records (LR 2-1) A-7 Well File 4052m P. F. Barth Supervisor, Reservoir/ Production Surveillance Unit I RECEIVED 1 1986 Alask~ Oil & Gas Cons. Commission , STATE OF ALASKA ALASK/~"OIL AND GAS CONSERVATION C~O~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. STANDARD ALASKA PRODUCTION COMPANY 73-41 3. Address 8. APl Number P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20131 4. Location of Well At surface- 2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.69' AMSL 6. Lease Designation and Serial No. ADL 28286 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number A-7 (12-26-11-13) PBU 11. FieldandPool prudhoe Bay Prudhoe Oil Pool~ 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional intervals will be perforated in March/April, 1986 at 4 spf: 11522' - 11539' BKB (Ref. BHCS/GR, 2/12/74) 11642' - 11676' BKB ( " ) A lubricator will be installed and tested to 3500 psi for all.well work. An SSSV will be reset and tested in the ball valve nipple at 2157'. RECEIVED MAR ! 1986 Alaska 0il & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is~true and correct to the best of my knowledge. Signed - --v ~ Title Supvr. Reservoir/Production The space below for Commission use P. F. Barth Surveillance Unit I Date Conditions of Approval, if any: Approved by. COMMISSIONER By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY January 20 , 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well A-7 (12-26-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our subseqUent report of stimulating this well. Yours very truly, JAB: JAM ~ Enclosures (2) cc: Drilling Well Files Well Records (LR2-1) A-7 Well File pA. Bragg u U ervisor Production Operations (MB12-1) STATE OF ALASKA ALASKA O~AND GAS CONSERVATION cO'~ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 73-41 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20131 4. LocationofWell At surface: 2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) ..... KBE = 64.69,~, AMSL 12. 6. Lease Designation and Serial No. ADL 28286 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number A-7 (12-26-11-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation E~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A 2000 gal. HCl acid wash Via coiled tubing was performed on Well A-7 on December 8, 1985; followed by a 83-bbl. bullheaded scale inhibitor squeeze on December 13, 1985. The well was shut in for 24' hours after the treatment. The SSSV was removed prior to the stimulation and reset after t~e job at 2157'. The treated intervals were as follows: 11684' - 11699' BKB 11709' - 11716' BKB 11726' - 11756' BKB 11766' - 11796' BKB 11810' - 11835' BKB RE£E VED 2 1986 Alaska 0ii & Gas Cons. Couu~ission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~i~gned/!-~~ /~,~~. Title Sup, r. Production Operations The space/b~1ow for Commission use . A. Bragg /! Conditions/of Approval, if any: V Date /--/7 By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY November 13, 1985 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well A-7 (12-26-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM~~0 Enclosures (3) cc: R. H. Reiley (MB12-1) Well Records (LR2-1) A-7 Well File /J/. A. Bragg" 6/6) //roduction operations Supervisor RECEIVED ~sl<a 0i~ & Gas Cons. oom~SS~O~ knchor~e STATE Of ALASKA · ALASKA (~ AND GAS CONSERVATION cO~'~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~ 2. Name of Operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 73-41 3. Address 8. APl Number P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 50-029-20131 OTHER [] 4. LocationofWell At surface: 2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM 5. Elevationinfeet(indicateKB, DF, etc.) KBE = 64.69' AMSL 6. Lease Designation and Serial No. ADL 28286 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number A-7 (12-26-11-13) PBU 11. FieldandPool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A 2000 gal. HCl acid wash, via coiled tubing, followed by a bullhead scale inhibitor squeeze is proposed for Well A-7. The well will be shut in 24 hours after the treat- ment. The SSSV will be removed prior to the stimulation and reset after the job at 2157'. The perforated intervals to be treated are as follows: 11684' - 11699' BKB 11709' - 11716' BKB 11726' - 11756' BKB 11766' - 11796' BKB 11810' - 11835' BKB This work is scheduled to commence in November/December, 1985. RECE[VED NOV ! Alaska 0il & Gas Cons. Commission Anchorage 14. i hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/~/~ ~~ TitleProdUction Operations Superviso~Date space/~w fo~ C%mmi;sio'n"'use ~/U A. Bragg The / ; Conditi~,Fof Approval, if any: Approved by Approved Coho7 By Order of COMMISSION~:R the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON To:SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE ~ BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 08/02/85 T#: 76355 REFERENCE: SOHI~NAL DATA - PRESSURE SURVEY DATA-  llowing material is being submitted herewith. Please acknowledge receipt by signing a f this letter and returning it to this office:-- A-7 ~ Flowing Gradient 07/28/85 Camco A-10 -~ " " 07/19/85 Camco X-I-~ " " 07/26/85 Camco X-2 -' " " '07/24/85 Camco X-14 --' " " 07/14/85 Camco Y-6" Static Gradient 07/29/85 Camco " " " 07/27/85 Camco Y-18 f RECE,VED ................ ~:__~~ -.-~w-a Aldridge LR2-1 ~~~/~ /~ .--~ '~0 5 ~ Technical Documentation DATE ............ 19 .-s[~ecords Management ,--- cons'--"commm Alaska Oil & Gas · Anchorage SOHIO ALASKA PETROLEUM COMPANY April 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 · 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage· Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL A-7 (12-26-11-13) PBU Enclosed in duplicate is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This subsequent report completes the workover of this well. Very truly yours, District Drilling Engineer RHR:IBG:ckg 32085/0044G Enclosure cc: Well File 17 RECEIVED , PR 0 8 0il & (~s Cons. Commission Anchorage STATE OF ALASKA ALASKA O" AND GAS CONSERVATION CO"MISSION SUNDRY )i rlOE8 AND REIN)RTA-4N WELI,, DRILLING WELL COMPLETED WELL r-I OTHER 2. Name of Operator 3. Addrm 4. Location of Well At surface: i700' SNL, 922' WEL, Sec. 35, TllN, R13E, UPM 7. Permit No. 73-/~ 1 8. APl Number 50- 029-20131 9. Unit or Lea~e Name I~):-V~ ~u-ml~- ~ ..... A-7 (12-26-11-1,3).,. PBU 'I 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 64.69' AMSL ADL 28286 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data Prudhoe Bay Prudhoe Oil Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Ca~ing [] . Perforations [] Altering Casing Stimulate [] Abandon ' [] Stimulation [] Abandonment Repair Well [] Change Plans I"1 Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [~ (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) O 0 13. Describe PropofadorComplet~ O~mtiOm (Clearly s~teallpertinentdatailsend give ~rtinentdates, i~luding estimat~ ~ of lta~ing any propoledwork, forAbandonmentlee20AAC25.105-170). The following work was performed during the workover on Well A-7. 1. Moved rig in. Pulled BPV. Changed 7" tubing and 7', x 9 5/8" annulus over to 8.7 ppg NaC1. Set 2-way check. ND tree. Installed and tested BOPE to 5000 psig. 2. Cut 7" tubing at 10,018'. Unable to pull t~ing. Cut 7" tubing at 9940' Pulled 7"- _ · tubing. Recovered remaining 7" tubing and seal mandrel. Tested 9 5/8" and 7" casing to 2500 psig. Cleaned out to 11,558' PBTD. 3. Set cement retainer at 11,804'. Established injection rate into perforations (11,810'-11,835'). Displaced 40 cu. ft. Class 'G' cement to stinger. Stabbed into retainer and squeezed 7 bbls. cement away. Cleaned out cement retainer. 4. Ran 7" packer/tailpipe assembly and set at 11,804'. Ran 4 1/2" tubing completion; set 9 5/8" packer at 9959". Install BPV. ND BOPE. 5. NU and tested tree to 5000 psig. Set packer. Tested tubing and annulus to 1000 psig. Changed annulus over to 9.6 ppg NaC1 and tubing over to diesel. Ran and set SSSV. Set BPV. Moved rig off. This work was completed on March 16, 1985. RECEIVED APR 0 8 1985 Alaska 0ii & Gas Cons. Commission Anchorage 14. I h~.l:fy~oing, it ,r~and correct ,o the best. of my knowledge. Signed~_] ~,,~---~%~ ~ ~ ~ ~J~/' '- Title District Drilling Engineer The r43acebelowforCommi.ionuse R.. 21~i~ey Conditions of Approval, if any: Approved by, By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1 ~0 Submit "Intentions" in Triplicate and "Subsequent Reports" in DuPlicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCH ORAG E, ALASKA 99502-0612 January 16, 1985 Alaska Oil & Gas Conservation Cc~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well A-7 (12-26-11-13) PBU Enclosed, in triplicate, is Form 10-403, sUndry Notices and Reports on Wells, for the above-named well. This gives notice of intention to change tubing. Very truly yours, RHR: IBG:pw Enclosures cc: Well File #17 RECEIVED 1 7 Alaska Oil & Gas Co~s, Commission Anchorage STATE OF ALASKA ALASKA C~_,, AND GAS CONSERVATION CC...,M ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER 2. Name of Operator Sohio Alaska Petroleum Company 3. Address P.O Box 6-612, Anchorage, Alaska 99502 4. LocationofWell At Surface: 1700' SILL, 922' WEL, SEc. 35, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 64.69' ~MSL I 6. Lease Designation and Serial No. ADL 23286 12. 7. Permit N°o 73-41 8. APl Number 50-029-20131 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number A-7 (12,26-11-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] . Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other t-'1 Pull Tubing I~ Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). During this workover a 4½" tubing completion with gas lift mandrels and an isolation packer will be run in place of the 7-inch tubing. The work is schedUled for January 1985. , 2. 3. 4. 5. 6. . . 10. Punch 7" tubing 3 jts. above PBR. Change 7" tbs. and 7" x 9 5/8" annulus over to 3.9 ppg NaC1. Install BPV. Move in rig. N.D. tree. N.U. and test BOPE to 5000 psis. Pull 7" tubing. RIH with 6" bit, 7" csg. scraper, and 9 5/8" csg. scraper. Clean out to PBTD. POH. RIH with 7" RTTS. Pressure test 9 5/8" csg. to 2500 psig. Set RTTS between 11~796' and 11,810'. Test for cement isolation behind 7" liner between these intervals. Cemenl squeeze for isolation if neccesary. POH. Rig up wireline. RIH'and set 7" packer/tailpipe assembly at 11,800'. Rig down wirelin~ RIH w/4½" tubing completion consisting of 9 5/8" production packer, 4~" sliding sleeve, and 4½" tubing to surface with 5 gas lift mandrels. Change 4~" x 9 5/8" annulus over to clean 9.6 ppg NaC1 and the 4½" tbs. to diesel through the sliding sleeve. Install BPV. Install and test tree to 5000 psis. Secure well Move ;rig ~f~:.~ E] V E D ~h~em-Work Re,port~'4t 14, I hereby certify that the f~ing is tr~ and corr~t to the best of my knowledge. Sign~ Title Bi'~rri~r Dri] ! ing Engineer Thes~ace bmBw ~r Commissio, use R. H. Retley JAN 1 7 1985 Alaska Oil & R:~.~ Cons. O0~mi.~.~inn Anchorage Conditions of Approval, if any: G¥ tOt~ll[ C. Approved by COMMISSIONER Approved Cop)' Returned / -- By Order of the Commission Form 10-403 Rev. 7-1 Submit "Intentions'' in Triplicate and "Subsequent RePorts" in Duplicate INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON GETTY TO~ SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 4-25-84 CC#: 75245 BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) REFERENCE: S~ FINAL DATA- P, RESSURE SURVEY DATA ~/~he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-7 S-5 Static Gradient Static Gradient 4-11-84 Camco 3-22-84 Otis (4/82) .C. D RECEIVED ......................... ,~%,,~~E~- '"' ~arolyn Bishop Development Geology DATE -Jkl,~e'b~--~-~e,(= 00~-C0mmJssJ0~ell Records .............................. J'~il;[~t~,& v~ ~ ~ Anchorage .SOHIO ALASKA PETROLEUM CO;V;PANY SFO ARCO CHEVRON EXXON 3111 "C" SIREE-I- ANCHORAGE', ALASKA TELEPHONE {907) 265-0000 MAIL: POUCH 6-61 2 ANCHORAGE, ALASKA 99502 GETTY TO: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIP, S TE OF AK . BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) Date: 4/23/~2. Trans.#: 1523 CC#: 49523 REFERENCE: SOHIO CASED HOLE FINAL LOGS T~e'f'011owing material is being'submitted herewith. Please acknowledge receipt by signing a ycopy of this letter and returning it to this office:-- C-7 EPL (ach) 3/9/82 #1 11400-11720 5" C-7 EPL (Sch) 2/25/82 #1 11400-11705 5" F-4 CNL (Sch) , 3/8/82 #9 9700-10561 5" ~;~ EPL (ach) 3/6/82 #1 11350.11802 5" 4/82) Karen Mestas Development Geology Well Records SO~{'O ALASKA FST.;::F)LfU',I COr, IPA.r',',Y SFO ARCO CHEVRON E >70N '~o. SF0/UNIT/STATE: (-Marathon) GETTY MOBIL PHILLIPS ~iTransmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) 3111 "C" STREE7 ANCHORAGE, ALASKA IELEPHONE (907) 26570000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 3/18/82 Trans. #: 1435 CC#: 49435 R~E: ' . A_ - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and r.eturning it to this office:-- SFO/UNIT/STATE: C-7 C-ll (-Marathon) PRESSURE SURVEY, DATA Pressure Survey & BHPD (Sch) 3/9/82 " " " (Otis) 2/23/82 " " " (Sch) 2/24/82 " " " (Sch) 2/25/82 " " " (Go) 3/3/82 " " " (Sch) 3/3/82 " " " (Cam) 2/5/82 " " " (Sch) 3/8/82 C-7 C-3 D-7 C-15 B-3A /82) R~CE,VE~ ~;~t'~t< 1 ~.'~..,,: Development Geology DATE 19 Well Records " A?~l<a Oi~ & G~:~ Cons. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company UHIO-BP ALASKA PRODUCTION DIVISION 3111 "C"STREET ,~HORAGE, /', LASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 A, NCHORAGE, ALASKA 99.502 UNIT/STATE/SFO Mobil (- Marathon) Phil[{ps _ .- _ .... - gPAE ....... ._-= .... SFO.. _- ......_-=- ............... REFERENCE: /SOHIO PRESSURE DATA '/"/ he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- 3/20/80 I_~['COMM~ I I ENG ' I 3 ENO ~ t-~ CEO~ Survey 3/6/80 " 3/4/80 " 2/z~/80 " 3/~/~0 " 3/zo/~o " 3/s/~o " 2/2~/80 " 2/25/80 " 3/?/80 " 2/2~/~0 " 2/2~/g0 " 2/22/80 3/2/80 A-2z--" Bottom Hole Pressure Data Form & Pressure ]3_6/ II ,, ,, ;, ,, ,, C--1 ..... Il l' Il I' 1, ,, C-3 L I1 ,, 11 ,1 ,, Il C-7' II I1 [1, II II I1 D-4' ' " " " " " ,, E-2 ~.-' " ' " ,, ,, ,, ,, J-6 p/ " " " ,' ,, ,, N_7~'' ,, ,, ,, ,, ,, ,, R-5/ Bottom Hole Pressure Data Form & Pressure Survey Well Records DATE 19 SOHIO PET. ROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA99502 TO: STATE OF ALASKA 3001 Porcuplna Drive Anchorcd'e, ./'.~t~ok~ 09501 Attn: Mr. H. Han]ilton STATE/UNIT/SFO 1/2]_/so REFERENCE: SOHIO WELL DATA · Ilowing material is being submitted herewith. Please acknowledge 'receipt by signing a 'O/ copy of this letter and returning it to this office'- ~TE/UNIT (minus Marathon) : C-4 EPL 1/i/80 #2 ~" 12 24/79 Bottom-Hole Pressure Data Form & Pressure 2/10/79 " " " " C-1 12/28/79 " " " " " C-9 12/13/79 " " " " " C-10 12,/22/79 " " " " " E-2 12/31/79 " " " " "' E-4 12/23/79 " " " " " F-1 1/1/80 " " " " " F-2 1/7/80 " " " " " F-3 1/1/80 " " " " " F-5 12/21/79 " " " " " F-6 12/23/79 " " " " " F-7 12/29/79 " " " " " F-8 1/2/80 " " " " " G-2 1/5/80 " " " " " N-1 12/7/80' " " " " " N-2 12/20/79 " " " " " Nm8 ........ /? --~ ~',~) ~-'~'~' /3q/~/ .Records ,.'.,,:.., / · RECEIVED ~_-/ ' ."../ .' , ¢¢4 .'% ' ' ". ..... DATE / 19 -- Survey Il Il Il Il Il Il II II Il Il Il Il Il Il Il II Il Il Il Il Il Il Il II Il II II Il Il Il Il Il 12/4/_7_9 .......... BottOmrHole .Pressure. Data Form & uarol Krieter · Pressure Sur~ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: ALASI~] ANCHORAGE, 1/4/80 State of Alaska .f. ,'~'iJ OF ALASKA "-'-,"~ O~1 & G~ Co~~~ ~,~~ ,. · -'o cupine Drive A.,cho:age, Ala~ ~1 Attn: Mr. H. REFERENCE: Sohio Data The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- C-10 }~agnetic Tape, PrintOut& Basic Info Sheet DDNLL 10740-11960 11/12/79 C-1 Spinner Survey 11/30/79 #1 5"  Spinner Survey 11/26/79 #2 5" 4-Arm Caliper 12/4/79 #1 5" D-3 4-Arm Caliper 12/3/79 #1 5~ N-8 Spinner Survey 12/7/79 #1 5'~ A-2 Spinner Survey 11/27/79,11./29/79 #1&2 Well Records 5I! SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION April 11, 1979 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 3111 "C" STRE~J TELEPHONE (907) 265. MAIL: POUCH 6-61~ Attn: Mr. H. Hamilton Subject: A-7 (12-26-11-13) C~_ntlemen: Please find attached in triplicate, Form 10-403, Sundry Notices and Reports on Wells, for the above mentioned well. very truly yours, -~. g. F~sga District Field Engineer cc: M.J. Smith Drilling File CC #7920 ,. Form' ! 0-4~8 REV. 1-10-~3 · Subml t "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELL L.-I OTHER 2. NAME OF OPERATOR Sohio Petroleum Company Division of Sohio Natural Resources Inc. 3. ADDRESS OF OPERATOR Pouch 6-612, .A~chorage, 2~aska 99502 4. LOCATION OF WELL At surface 2575' SNL, 198' WEL, Sec. 26, TllN, R13E, UPM -. : - 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 64.69' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20131 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. A-7 (12~26-11,-,13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool ll. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) \ Sec. 26, TllN, R13E, UPM 12. PERMIT NO. 73-41 3ort, or Other Data NOTICE OF INTENTION TO; TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF.. WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) :15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in the well will be reperforated using Schlumberger 4" Hyperjet~I1 carrier guns' during April. 11684 - 11699 ft. BKB (ref. BHCS/GR 2-12-74) 11709 - 11716 ft. BKB (ref. BHCS/GR 2-12-74) 11726 - 11756 ft. BKB (ref. BHCS/GR 2-12-74) 11766 - 11796 ft. BKB (ref. BHCS/GR 2-12-74) 11810 - 11835 ft. BKB (ref. BHCS/GR 2-12-74) A~ch~ra§~ 16. I hereby certlf~at ~g~e and correct (This' space-f-or State °f~ce/~, ~ "~ff'-~: J~ ~1 [ ....... ~ J ~t~n ~': ~ TITLE _District Field En.q:i.~ee~ DATE_A~ril 12, 1979 APPROVED BY I]~ [~?.! ~ ~-""- TITLE CONDITIONS OF APPROVAL, IF ANY; .BY ORDER OF THE CO~dtt~lOSlON See Instructions On Reverse Side DATE ..... Approve~ Copy SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources COmpany · SOHIO,-BPALASKA PRODUCTION DIVISION TO: I'" it-co ¢.M 3111 "C"STR£E'¢~i RE5 :.. ANCHORAGE, ALAS (A MAIL: POUCH 6-61~---)-4 ANCHORAGE, ALASKA ~Sp~ , . ',~' 20,.O~ Unit/P&P/Sna= =~/) April 5, 1979[~,i REFERENCE: Well Data Transmission A-1 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:' ~'"/~ 1 copy of the followin,.g Sohio opera'well pressure data: Logs of the / Government Section Transient Survey/Packet Il II II' II Il II I! II I! II II Il II Transient Pressure & Spinner/Packet " " /Packet Diff. Temp? Gamma Ray Flowmeter Fluid Density Hydro Log Spinner Log Spinner Log following Sohio operated wells: Run 1 3/'1/79 & 3/8/79 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 2-9-79 2-7-79 3-4-79 3-2-79 2-3-79 3-19-79 ./ · . Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas 3001 Porcupine Dr. Anchorage, AK 99504 Well Data Transmission REFERENCE: MAIL: POUCH 6-61 ANCHORAGE, ALASKA -STATE March 12, 197 The following material is being submitted herewith. Please acknowledge receipt by signing a ~,,~-'2_.," --.~ copy of this letter and returning it to this office'- ~ 1 sepia and 1 print for the following Sohio operated wells: / B-2 Spinner Survey Run 1 /GC-3B Temp Log Dec. 6, 1978 ,~ r...~t~.~ ( _/A-5 Transient Pressure Survey/Press-Temp Guage 2-15-79 iI~?''''' ' L '~ ~~--~--~~- Key Well Transient Survey/Data Packet 2-14-79 ,~~,~ ~//~ rans~ent Pressure and Spinner Survey/Data Packet 2-26-79 ~o±ette '±'racy Well Records DATE ' ~ 19 ! SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska ]Department of Natural Resourc.a,,, r-...i."_'on o£ Oil & Cas ,.::.sb'~..~ orou..?'.!e 3111 "C" STREET ANCHORAGE, ALASKA TEL. EP~!DN~ '>~7' 2 ~-2.000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA'99502 DEV-PB-250/7 DEV-PB-250/6 DEV-PB-250/8 D~c~nl~r 13, 1978 REFERENCE: Well Data Transmission copy of this letter and returning it to this office:-- 'I-ogs for the 'following Sol/io Operated'wells: B-9 CNL~DC-TVD Run 1 '5" & 2" BHCS -TVD DIL-TVD FDC-TVD J-5 ~NL D-6 CNL F,-1 ~ ~NL GC-3A Eng. Prod. Log A-4 " " " D-5 Flowmeter C-3 " F-7 spinner Run 1,2 Run 1,2 Runl Run3 Run3 Run2- Runl Runl Runl I! I! !! I! 1! 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" & 2" & 2" & 2" C-7 J Transient Pressure Survey 9-23-78 ~ A-4 / Transient Pressure Survey . 11-3-78, Enclos'!ng pressure build-up survey, field data, graph, data sheet ~ ~~--.:-.-. -,~ : . ,,;fi! ~-'--:';-~.=_.~,-,~,-,~:' ~.~.'! ", ~-.-'. - Well Records/' ~ t '\;' [2 D {,\ L \.. i~ i V L ? DEC 1 5 1978 ........................................................................................... i ........................... A',:t~! }_~.~!age~ ..................... R~i-Kwik, Quality Litho SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Division of Oil & Gas Conservation Department of Natural Resources 3001 Porcupine Dr. Anchorage, AK 99504 Attn: Mr. H. Hamilton 3111 "C" STRI: ET ANCHORAGE, AL ASI~A'5 ~N~', ~. MAIL: POUCH ~-612 3 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Transient Pressure Surveys for the following wells - enclosing Pressure Gradient Survey Data, Pressure Gradient Survey Graph, Pressure Build-up Surv~) Field Data, Pressure and Temperature A-3, A-5, (A-~ B-2, B-3A, B'8, C-2,(2) C-3, H-8, J-6, N-1 Governmental Section Well Transient Survey with the above enclosures for well M-3 Colette Tracy Well Records DATE /5//?/7~ 19' SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99502 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 September 22, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Government Sectional Survey - J-3 .~ial Transi, ent Pressure , C-6', ~'C 7"~! B-3A Surveys Key Well Transient Surveys for B-2q C-2', for the following wells: the following wells: E.I., J-6~ H-8' Colette Tracy Well Records RECEIVED DATE 19 __ SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP A L AS~"I~_U C,T I ~1~11~1 ~V I S I 0 N TO: e of Alaska ~e~a~ment of Natural Resources A i~D~~°n of Oil & Gas 3001 Porcupine Dr Anchorage, AK 99502 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 DEV-PB-250/8 September 14, 1978 REFERENCE: The ~llowing material is ~ing submi~ herewith. Please acknowled~ receipt by signing a _ y of this le~er and returning it to this office:- A-7 Transient Pressure Survey ~ sepia and 1 print for the following Sohio Operated wells: ~t-6 TDT-M Runl 5" TDT-M Run 1 5" CNL Run 3 5" BHCS Run 1,2,3 2" & 5" Colette Tracy Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska Department of Natural Resources Division of Oil & Gas' Conservation 3001 Porcupine Drive Anchorage, AK 99509 Attn: Mr. O. K. Gilbreth 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 9EV-PB-250/8 June 23, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- copies of the following..reports: B-1 State Sundry Notice - Subsequent Report of Shoo'ting or Acidizing N-8 State Sundry Notice - Subsequent Report of Shooting or Acidizing B-4 State Sundry Notice - Intention to Shoot or Acidize B-2 D-3 -3 Initial TransientPressure Survey ~ Key Well Initial Transient Pressure Survey Static Pressure Survey Static Pressure Survey Key Well Static Pressure Survey Key. Well Transient Surveys for the follOwing well: -_ ,~_, ~,. ,~ Governmental Section Transient Pr.essure Surveys for the following wells: F-l, F-2, F~3, FiS, F~6, F-7, F-8, G-l, N-5, N-6 sepia and 1 print for the following wells: B-2 Spinner Surveys Run 1 5" -~ Flowmeter Run 1 5" .~CNL Run 1 5" N-6 Temperature Log Run 1 5" RECEIVED DATE SOhiO PETROLEUM COMPANY- Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: State of Alaska ~Division of Oil and Gas 3001 Porcupine Dr. Anchorage,. Alaska 99504 Attn: O.K. Gilbreth 3111 "C" STREET . ANCHORAGE, ALASKA TELEPHONE (907)265-0000 MAIL: P.O. BOX4-1379 ANCHORAGE, ALASKA 99509 DEV-PB'250/8 June 1.2, 1978 REFERENCE: The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- Triplicate copies o'f Form 10-403, for 'the following wells: B-I, B-2, N-8 1 sepia and 1 print for the following' wells: A-2 CNL Run 1 5"  CNL Run 1 5" CNL Run 1 5" C-2 CNL Run 2 5" C-5 CNL Run 2 5" F-4 CNL Run 2 5" H-8 Spinner/Diff/Temp 5" RECEIVED DATE SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Cuj FiD NTIAL 3111 "C" STREET ANCHORAGE, ALASKA TEL EPHON E (907)265-0000 MAIL: P.O. BOX4-1379 ANCHORAGE, ALASKA 99509 March 15, 1978 Gentlemen: Well A-7 (12-26-11-13) Enclosed, in duplicate, is Form P-7, Completion Report for the above-named well, together with the Well History. Very truly yours, S0~P. ETROLEUM COMPANY ?. R. Judd District Drilling Engineer PRJ: j a Enclosures cc: Well File #17 Colette Tracy Form P--.7 ' SUBMIT IN DUPLICATE* $'rAT1: OF ALASKA (See other in- structions on OI/ AND GAS CONSERVATION coMMITTEE reverse side, Il I WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* la, TYPE OF WELL: o'zl, ~-~ bAS WELL WELL ~ bag [~ Other b. TYPE OF COMPLETION: .. NEW ~-~ WORK ["~ DEEr- ~'~ PLUG ~-'~ DIFF. ~-~ W E L L OV ER E N BACK RESVR. Other 2. NAME OF OPERATOR · Sohio Petroleum Co., Div. of Sohio Natural ResoUrces Company '3. A~DRESS OF OPERATOR P. O. Box 4-1379, Anchorage, Alaska 99509 ~. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 922' WEL,1700' SNL, Sec. 35, TllN, R13E, UPM At top prod. interval reported below 201' EWL,2624: NSL, Sec. 26, TllN, R13E, UPM At total depth 206' EWL, 2725' NSL, Sec. 26 TllN, R13E, UPM CONFIDENTIAL API N~CAL CODE 50~029~20131 LEASE D~SIGNA~ON A/~D SERIAL NO. ADL 28286 ~. IF INDIA.H, ALLOTTEE OR TRIBE NAMII 8. UNIT,FA~RA{ OR LF~SE NA~IE Prudhoe Bay. Unit 9. WhiLL NO. A,,7 (112-26-11-13) 10. lrl~/.~D AND POOL; OR WILDCAT Prudhoe Bay, prudhoe 0il 11. SEC., T., R., M., (BOTTOM HOL~ OBJECTIVE) Sec. 26, TllN, R13E, UPM 12. PEH1VIIT ~O. 73-.41 1/13/74 ] 2/11/74 [ 3/2/78 I KBE 64.69" AMSL t 45.49' AMSL 18. TOTAL D~:l-'l'li, MD & TVD~9. P:LUG, BJkCK MD & ~D~0. ~r ~L'rm~ CO~L.. ' I 21. ' "'NTg.VALS~"rr,L~n .~ ~ ~ ~ [ ~OW ~Y* ROTARY TOOLS ................. CABLE TOOI S 11899 ~ 9068 T~ ~1868 ~ 9043'~D ] None I ~ 'Total ~ ' '~ PRODUCING fNI~VAL(S) OF ~'S'C ' ' · ''' , . OM~'I'IO~, ~OM, N~E (~ AND ~)* ' ~. W~ DI~ON~ Tap: 11684' ~ 8878' TVD ~ SU~VE~ Prudhoe 0il Pool B;ottom: 11835' MD 9011' T~ .[ Yes m. ~ m.~c~mc ~ OTa~ ~s av~ j DIL/SP, BHCS/GR,. FDC/CNL/GR, ETT, CBL/GR __ I" - ' ~ CASING RECORD (Report all strings set in well) _ wrmaT, LB/rE, 1~ ~romE ] D~.. ~ (m~, I SOLE s~zz ! cm~-~ rxcor~ . 9 5/8"., 47#; ' .~ N-80 ~2107-16562'/ 12 1/47 2275 sks '9 5/8;~10 3/~'[47#/55'5~ N-80 [ 2118~'29# }[_N-80 [10028-~189~[~ieback +ith 3 jim. 9 5/8"xll )/~"~hermocase Li~8,1/2~. ' 850 sks 26. LINER ~CO~ [ 27. TUB~G :{?11709,'.11716t ,, u ' 2/12/74 .:~' :11766"-11796' " ' " " :~11810'-11835" " . ,, ,., PRODU6-PION ~ (MD) SIZE ' [ DEPTH SET (MD) I PACKER SET (MD) 7"': [ 10053 ~ .... i ~CID, SHOT, F~'U~, C~:NT SQU~ZE, ~C. 11897 t, [ 100 sks: Class- U'GU: cement I FIRST P~ODUCTION i FRODUCTION METHO.D (Flowh~g, gas lift, pumping--size and type of pump) WELL STATUS (Producing or or T'-ST. [ttoLras TESTED .: lcaloxE SIZE IPROD'N FOR . 1 ' 'F I ' u c D~SPOSlTION or ols (8o~, ~$eg 1or ~el, venteg, e~e.) o~' LIST ATTACHMENTS .. Well History D:¥18,~Otl 01 0~i 33. I hereb~ certff~~~ed information is complete and correct as determined from all: ,m~,.~~~~i ,:l:lFd ' TIT'' Diatrtct Drilling Engineer *(See Instructions and S~ce, For Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct ,.,veil completion report end to9 on all types of lanJs and leases in Alaska. Item: 16:. Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in cther spaces on this form and in any Items 20, and 22:: If this well is completed for separate production from more than one :nterval zone (multiple completion), so state ~n item 20, and ir~ item 22 show the p,c:J~c:r'~9 interval, or top(s), bottom(s) and name (s) (if any) for only the interv.~! ref.~orted in item 30 Submit a separate report (page) on this form, adequately identified, for each additior~a! ir~te~ val to be seperately produce.d, show- ing the ackiitional data pertinent to such interval. Ite~m2&: "Sacks Cement": Attached supplemental records for this well shouIJ show the details of ~ny mul- tiple stage cementing and the location of the cementing tool. Itom 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY O~' IOORMATION TE. STS INt'LUI)IN(; INTERVAL TF~qTED. PI~E~qURE DATA ~ ~COVERI~ OF OIL GAS, 35. G~GIC MARK~ WAT~ AND MUD NAM~ BKB. Subsea Sag R~uer 11512 ~ 8667 Shubl~k 115~6 8695 Sadleroch~t 11637 ~: 8773 . WELL HISTORY CO? FJDENTJAL BP WELL NO. A~7 (12~26~--11~13) DRILLING January, 1974 Spud well at 1600 hours, January. 13, 1974, Drilled 18 1/2" hole to 2740~, Ran 30 jts. of 72# amd 39 its. of 68# 13 3/8" N~80 Buttress casing with shoe at 2698': with 1 1/4" tubing strapped to the 13 3/8" casing from s.urface to 1837~. Cemented with 3250 sks Arcticset and displaced with 41 bbls water.. Circulated out 50 bbls cement at surface. Tested BOP"S, R1H, drilled float and shoe and tested shoe bond to 500 psi. Directionally drilled and surveyed to 10566~, dropped multishot survey and POH. Ran 216 jts. of 9 5/8" 47# N-80 Buttress casing liner with shoe set at 10562'· and the top of PBR 2107'. Mixed and pumped 45 bbls of HOwco mUd flush, 1500 sks of Halliburton Light, and 200 sks of Class '"G". Lost complete returns with 340 bbls of ~.:. displacement away out of 647 bbls total displacement. Preparing for second stage cementing. February, 1974 Opened lower F.O. cementer. Mixed and pumped 30 bbls mud flush followed by 175 Sks " Howcolite and 200 sks Class. "G". Displaced with 73 bbls mud, Closed lower F. O. cementer. Opened middle F. O. cementer and circulated, Batch mixed 200 sks permafrost II, displaced with 46 bbls mud, and closed F. O, cementer, Drilled cement plug from 10200~ to 10477', drilled catcher sub and landing collar, tested casing to 3500 psi. ~~rr~~osu~.a__n~.~TT log, Drilled and surveyed to 11899", Ran 48 jts. of 7" 29# N-80 Buttress casing and s-et shoe at 11894? Cemented with 850 sks Class "G" and displaced with 243 bbls mud, reversing out excess cement. Tested 7" x 9 5/8" lap to 1000 psi. Tested 9 5/8" casing to 2650 Psi above 3000". Displaced top 2500" of well to diesel. Released rig fromA~7 at 0200 hours, February 16, 1974. COMPLETION Accepted rig 1830 hours, 9/8/77. Installed and tested BOPE, Ran 2 jts. 9 5/8" 47# controlled-yield N~80 Butt~ress casing ~ith ·9 5¢'-. FOE:. hatwe.en~ 48 jts,. 10 3/4!!..55 5# controlled-yield N-80 Buttress casing and 3 its,. 9 5/8" x 11 3/4"~ Thermocase ll and landed at 2108'~. Arctic Packed 9 5/8" x 13 3/8" annulus, Displaced well to CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay, Ran CBL log under pressure~ Drilled out 7" shoe. Set retainer at 11868~' and squeezed shoe with 100 sks Class "G" cement. Ran 255 jts. 7" 26# controlled-yield N-80 AB~IJq4S tubing stabbed into PBR at 10019'. Ball valve nipple at 2006'·. Displaced tubing to diesel, Tested tubing to 3500 psi. Installed and tested Xmas tree. Released rig at 2400 hours, 9/19/77~ PERFORATING March~ 1.9.7.8 Pressure tested tubing to 3000 ps'ig and the inner annulus to 1500 psig, Perforated the following intervals using Schlumberger 4~ carrier guns Hyper Jet II~ 4 S,P.F. 11,684 - 11,699 ft,. BKB (ref.~ BHCS/GR (2~12~74l 11,709 - 11,716 ft. BKB~. (?el, BHCS/GR (j2v12m74)~ 11,726 - 11,756 ft.. BKB (~ef, BHCS/GR (2~12~74) 11,766 - 11~·796 ft. BKB. (ref.. BHCS/GR~ (2~12~74) 11,810- 11,835 ft. BKB (ref. BHCS/GR (2-%2-74) CONi:iD[N i IAL Immediately following perforation operations a static bottom~hole pressure survey was recorded. Ran and set I.S. and SSSV. Tested SSSV, swab valve, master valve, END OF OPERATIONS. The Well was left with the SSSV closed and with the well headvalves:~°se--d~ [except the surface safety valve), SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907)265-0000 SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 ATTENTION: Mr. O.K. Gilbreth, Jr. Gentlemen: A-1 (42-35-11-13) A-2 (41-36-1'1-13) A-3 (43-27-11-13) A-5 (43-34-11-13) March. 7, 1978 MAIL: P. O. BOX 4-1379 ANCHORAGE, ALASK/~ i~§i3, O~ -~T.~'~-~. 3 Z Ff'~L ~_'" .. .: 2-26-11-13) 2-36-11-13) H-6 (21-11-13) -- GC-2B (16-11-13) · D-5 (23-24-11,13R) Enclosed please find in triplicate form 10-403, 'SUndry Notices and Reports on Wells, and in duplicate form P-4, Monthly Report of Drilling and Workover Operations, for the above Wells. VerY' trulY yours, ' / iroleum COmpany G. D. T ,.,. Manager-~d Op ~ a~ GP :bs Enclosures cc: P.E. Well 'files Drilling well files A-7 (12-26-11-13) Form ! 0-403 REV. 1-10-73 Submit "Intentions" in Triplicate & '.'Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 2. NAME OF OPERATOR SOHIO PETROLEUM COMPANY A DIVISION OF SOHIO NATURAL RESOURCES COMPANY 3. ADDRESS OF OPERATOR P.O. Box 4-1379, Anchorage, Alaska 99509 4. LOCATION OF WELL At Su trace 2525' SNL, 198' WEL, SEC. 26, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 64.69' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re NOTICE OF INTENTION TO: 5. APl NUMERICAL CODE 50-029-20181 6. LEASE DESIGNATION AND SERIAl NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME PRUDHOE BAY UNIT WEST 9. WELL NO. A-7 (12-26-11-13) 10. FIELD AND POOL, OR WILDCAT PRUDHOE BAY, PRUDHOE OIL pOoL 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) SEC 26, TllN, R13E, UPM 12. PERMIT NO. 73-41 )orr, or Other Data SUBSE(~UENT REPORT OF: FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ABANDON* SHOOTING OR ACIDIZING ABANDONMENT* REPAIR WELL CHANGE PLANS (Other) , (Other) (NOTE-' Report results of multiple completion on Well COmlHetlon Or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letalls, and give pertinent dates, including estimated date of starting any proposed work. The following intervals in this well were perforated (at 4 S.P.F.) for production: 11,684 - 11,699 ft. BKB (ref. BHCS/GR 2-12-74) 11,709 - 11,716 ft. BKB (ref. BHCS/GR 2-12-74) 11,726 - 11,756 ft. BKB (ref. BHCS/GR 2-12-74) 11,766 - 11,796 ft. BKB (ref. BHCS/GR 2-12-74) 11,810 - 11,835 ft. BKB (ref. BHCS/GR 2-12-74) A static bottom-hole temperature survey was conducted prior to perforating. Immediately following the perforation operations, a static bottom-hole pressure survey was recorded. The well was left. with a SSSV in the nipple at CA. 2000 ft. BKB. (This space for Sta't~ office use) TITLE APPROVED BY CONDITIONS OF APPROVAL, IF ANY; TITLE DATE See Instructions On Reverse Side A-7 12-26-11-13 Form No. P-4 REV. 3- 1-70 ~,~¢~ SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE · 50-029-20181 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 1. OIL ~ GA~ 1~ 7. IF INDIAN'ALOTTEE OR TRIBE NAME WELL~3~ WELLI I OTHER 2. NAME OF OPERATOR SOHIO PETROLEUM COMPANY A DIVISION OF SOHIO NATURAL RESOURCES 3. ADDRESS OF OPERATOR P.O. Box 4-1379, Anchorage~ Alaska 4. LOCATION OF WELL 99509 2525' SNL, 198' WEL, SEC. 26, TllN, R13E, UPM 8. UNIT FARM OR LEASE NAME PRUDHOE BAY UNIT WEST 9. WELL NO. A-7 (12-26-11-13) 10. FIELD AND POOL, OR WILDCAT PRUDHOE BAY.. PRUDHOE OIL POOL 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) SEC. 26, TllN, R13E, UPM 12. PERMIT NO. 79-41 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. 1/2 March 1978 Pressure tested tubing to 3000 psig and the inner annulus to 1500 ps±g. Perforated the following intervals using Schlumberger 4" carrier' guns Hyper Jet II, 4 S.P.F. 11,684 11,709 11,726 11,766 11,810 - 11,699 ft. BKB (ref. BHCS/GR 2-12-74) - 11,716 ft. BKB (ref. BHCS/GR 2-12-74) - 11,756 ft. BKB (ref. BHCS/GR 2-12'74) - 11,796 ft. BKB (ref. BHCS/GR 2-12-74) - 11,835 ft. BKB (ref. BHCS/GR 2-12-74) Immediately following perforation operations a static bottom-hole pressure survey was recorded. 6 March 1978 Ran and set valve. END SSSV closed the surface I.S. and SSSV. Tested SSSV, swab valve, master OF OPERATIONS. The well was left with the and with the well head valves closed (except safety valve). 14. I he~*by ce~y that', fore~i~is ~u, and con~t ' S IGNED~~¢~ TITLE ~ W~ ~.~ DATE oil and ~a ~on$~r~ation ~ommitt~ by th~ lBth o~ the au~din~ month,unl~ otherwise dir~t~. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 "C" STREET ANCHORAGE, ALASKA SOHIO-BP ALASKA PRODUCTION DIVISION State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O.K. Gilbreth Subject: ~12-26-11-13) ~ (22-36-11-13) Gentlemen: February 1, 1978 TE LEPHON E (907)265-0000 MAIL: P. O. BOX 4-1379 ANCHORAGE, ALASKA 99509 . , ' ___ Enclosed please find in triplicate form 10-403, Sundry Notices and Reports on Wells, for the above wells. Very Truly yours, Sohio Petroleum Company Manager Operations Enclosures cc: P.~. well file A7 A8 Drilling well file A7 A8 i978 Form 10-403 REV. 1-10-73 Submit *'Intentions" in Triplicate & "Subsequent Reports" In Duplicate STAT E ~'~ ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Oo not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposa!s.) gGAS g 1. OWL%L WELL OTHER 2. NAME OF OPERATOR .q~hin p~fr~l~n: A Divi.~ion of Sohio Natural Resources 3. ADDRESS OF OPERATOR CiD. · P.O. Box 4-1379, Anchorage. Alaska 99509 4. LOCATION OF WELL At surface 2525' SNL, 198" WEL, Sec. 26, TllN, R13E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE 64.69' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20131 6. 'LEASE DESIGNATION AND SERIAL NO. ADL 28286 . 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit W~st 9. WELL NO. A-7 (12-26-11-13) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Pru.dhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 26, TllN, R13E, UPM 12. PERMIT NO. 73-41 3ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR AC~OIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF E~ REPAIRING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all Pertinent detall~, and give pertinent dates, Including estimated date of starting any proposed work. The following intervals in this well will be perforated (at 4 s.po ;f.) for production: Zone 4 11684 - 11699 ft. BKB (15') (ref. BHCS/GR 2-12-74) Zone 4 11709 - 11716 ft. BKB (7 ') (ref. BHCS/GR 2-12-74) Zone 4 11726 - 11756 ft. BKB (30') (ref. BHCS/GR 2-12-74) Zone 4 11766 - 11796 ft. BKB (30') (ref. BHCS/GR 2-12-74) Zone 4 11810 - 11835 ft. BKB (25') (ref. BHCS/GR 2-12-74) 170 A static bottom-hole t~nperature survey will be conducted prior to perforating. ~iately following the perforation operations, a static bottom-hole pressure survey will be recorded and the well will be back flowed to clean up. The well will be left with a SSSV in the nipple at ca. 2000' BKB. RECEIVED 16. I hereby certify that the foregoing is true and correct (This space for State office use) CONDITIONS OF APPROVAL, IF A~': D!vision oi Oil and Gas Cans~rv~tion TITLE Petroleum En§ineer See Instructions On-Reverse Sid~ DATE February 15, 1978 BPALASKA INC. 3111 - C - STREET · TELEPHONE {907) 279-0644 CONFIDENTIAL MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 October 6, 1977 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Gentlemen: BP Well No. A-7 (12-26-11-13) Enclosed, in duplicate, is Form P7, Well Completion Report for the above-named well together with the Well History. Th~S well has been suspended pending perforation. ~ Very truly yours, District Drilling Engineer PRJ:ja Enclosures cc: Well File #17 Regina McGaffigan OCT 1 11977' D!visio. ~f Oil Form P---7 SUBMIT STAT$: OF ALASKA ' : (see other in- st ructions on OIL AND GAS CONSERVATION COMMITTEE reve,'se i i i WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* ii WELL WELL b. TYPE OF COMPLETION: .~EW [~ WORK ~] WELL OVER NAME OF OP~RATOa BP Alaska, Inc. 3. A~Da~ss oF OPER^TO~ " EN BACK RESVR. · _ ,,,, i ,1 uJ i 11 ,,, P. 0. Box 4-1379, Anchorage, Alaska 99509 4. LOCA~ION OF WELL (Report location clearl~l and in accordance with any ~tate requirements)* xt~u~ac~ 922' WEL, 1700' SNL, Sec. 35, T11N, R13E, UPM At top prod. interval reported below Sa~ ~SST 198' EkrL, 2535' NSL, Sec. 26, TllN, R13E, UPM At total depth 206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM APl NU'MFA~ CODE 50-029-20131 LEASE DESIGNATION A.ND SEI~I~I., NO. ADL 28286 ?. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT,FArM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. A-7 (12-26-11-13) 10. FIELD A2q'D POOL; OR WII-A3CAT Prudhoe Bay,Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 26, TllN, R13E, UPM 12. PERIVIIT NO. 73-41 ls. DATE SPUDDED [14': DATE 1/13/74[ 2/11/74 [ 9/19/77 lS. T~AL D~, ~ & TVD~9. PLUG, ~CK MD ~ WD~. ~ ~L~LE CO~., { 21. 11899' ~ 9068' TVD[11868' ~ 90~3'T~] ~ow~, None i ~o~, ~oo~ Total ~. PRODUCING I~VAL(S), OF ~IS COM~I~, BO~OM. N~E (~ ~ ~)* None ~. ~E ELECTRIC ~D DIL/SP, BHCS/GR, FDC/CNL/GR, ETT, CBL/GR ~ ' . .CAM~G ~ (Re~ all strips set in w~ll) · CAS~G SIZE ] WEIGh, LB)~.~ G~E i D~'~. (~) /N-SO [ {.-so { 9-5/8"/~0-3/4" 26. LINER ~CO~ ~. ~E~ORATIONS ~P~ TO PRO~O~ ~ ([n~rv~, ~ze ~d number) ~one. Shoe DATE FIRST P~ODUC~ON [ ~DUCTION METHOD (Flowh~.g, gas Iii. t, pump~--size and type of p~p) O~TZ 0F TZST, ~O~S T~ ~]~OI{E SIZE [~OD'N FO~ OI~BBL. G~CF. I 'F 31. DISPOSITION Or OaS (Sold, ~,ed for fuel, vented', etc.) ~ I , i 1~: ~I~VATIONS (DF, RKB, RT, GR, ~UC)* [ 17. EL2gV. CASINGHEAD KBE 64.69' AMSL 45.49' AMSL , ~_ ~;NTERVALS DRILLED BY '! CABLE TOOLS 23. WAS DIRECTIO.NAL ! SURVE~ ~ADE ~ Yes .I ~'.1 hereb' cert,y~r;~~ information ,. com.lete and corre., as determined 'r~'~,~,',~able records, , SIGNED TITLE District Drilling Engineer DATE : *(See Instructions and S~ces [or Additional Data on Reverse Side) DElYCI-I INT]~RVAL (MD) ~u~OUNT ~'~ND K/ND O!F 1VIA. T~EP~IAL USED squeeze 11897' 100 sks Class G cement W-ELL STATUS (Producing or shut-in). WA~BB~. [ GAS-OLL r~A.TIO zo~18½.s~z~. [[ 3250 sksCm~w~NG RECOI~D { ~O~-T PUL~ { 227s sks tieb~ck8~,, [~ith8503sks~tS' 9-5/8" x 1173 ,4," ThermocaseII 27. TUB~G S~ (MD) SIZE D~ SC (MD) [PACK~ SET (~) 7" 10053' ' {, ~. ~CID, SHOT, FT~CTU~, INSTRUCTIONS General: This form is designed for submitting a complete arid correct well cornplet~or~ report e~d log all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise showr~) for depth measure- merits given in cther spaces on this form and in any a~tacF~?-~er~ts Items 20,'and 22:: tf this well is completed for separatc prcduction from more than one interval zone (multiple completion), so state ~n item 20, and i~ item 22 show the prcJuci~3 interval, or i~tervals, top(s), bottom(s) and name (s) (if any) for only the interva! ret~orted in item 30 Submit a separate report (page) on this form, adequately identified, for each additior~al interval to be seperatety produce.J, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoutJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). , 34. SUMM'AI{¥ OF FORMATION T~Z.~'I'S IN('LUDIN(; INTERVAL TESTED. t-'HI~.~SURE DATA ~ ~COVERIF~S OF OIL. GAS, 35. G~GIC MARK~ WAT~ AND MUD M~s fi~ ~u~ v~.'"6~ i i, ,i i , ', i ~ ..., ¥,-n, .r BKB Subse~ Sag R~ve: Z~SZ2' 8667 ' ShubZ~k 1~546 ' 8695 ' Sad~eroch~t 1Z6~7 ' 877~ ' ~. C~OIIE DATA. Aq'I'ACII BRIKF :D~C~I~ONS OF LITi[OLOGY. POR~ITY. F[~AC~R~. A~NT ~$ ii i i i i i i BP Well No. A-7 (12-26-11-13)- WELL HISTORY DRILLING January, .1974 Spud well at 1600 hours, January 13, 1974. Drilled 18-1/2" hole to 2740'. Ran 30 jts. of 72# and 39 jts. of 68# 13-3/8" N-80 Buttress casing with shoe at 2698' with 1-1/4" tubing'strapped to the 13-3/8" casing from surface to 1837'. Cemented with 3250 sks Arcticset and displaced with 41 bbls. water. Circulated out 50 bbls. cement at surface. Tested BOP's. RIH, drilled float and shoe and tested shoe bond to 500 psi. *Directionally drilled and surveyed to 10566', dropped multishot survey and POH. Ran 216 jts. of 9-5/8" 47# N-80 Buttress casing liner with shoe' set at '10562' and the top of PBR 2107'. Mixed and pumped 45 bbls. of Howco mUd flush, 1500 sks of Halliburton Light, and 200 sks of Class "G". Lost .complete returns with 340 bbls.~of displacement away out of 647 bbls. total displacement. Preparing for second stage cementing. February~ 1974 Opened lower F.O. cementer. Mixed and pumped 30.bbls. mud flush followed by 175 · sks Howcolite and 200 sks Class "G". .Displaced with 73 barrels mud. Closed · lower F.O. cementer. Opened middle F.'O. cementer and circulated. Batch mixed 200 sks Parmafrost II, displaced with 46 barrels mud,. and closed F.O. cementer. Drilled cement'plug from 10200' to 10477', drilled catcher sub and landing collar, tested casing to 3500 psi. Ran Sperry Sun gyro survey and ETT log. Drilled and surveyed to 11899'. Ran 48 jts. of 7" 29# N-80 Buttress casing and set shoe at 11894'. Cemented with 850 sks C~ass "G" and displaced with 243 barrels mud, reversing out excess Cement. Tested 7" x 9-5/8" lap to 1000 psi. Tested 9-5/8" casing to 2650 psi above 3000'. Displaced top 2500''of well to diesel. Released rig from A-7 at 0200 hours, February 16, 1974. COMPLETION Accepted rig.1830 hours, 9/8/77. Installed and tested BOPE. Ran 2 jts. 9~5/8'' 47# controlled-yield Buttress casing with 9-5/8" FOC between, 48 jts. 10-3/4" 55.5# controlled-yield N-80 Buttress casing and 3 jts..9-5/8" x 11-3/4" Thermocase II and landed at 2108'. Arctic Packed 9-5/8" x 13-3/8" annulus. Displaced~well to CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay. Ran CBL log under pressure. Drilled out 7" shoe. Set retainer at 11868' and squeezed shoe with 100 sks Class G cement. Ran 255 jts. 7" 26# controlled-yield N-80 AB-IJ-4S tubing stabbed into PBR at 10019'. Ball valve nipple at 2006'. Displaced tubing to diesel. Tested tubing to 3500 psi. Installed and tested Xmas tree. Released rig at 2400 hours, 9/19/77. OCT I ! 1977 Anchor?? bpal.aska inc. , 311 I - C - STREET TELEPHONE (907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director Gentlemen: MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 BP Well No. A-7 (12-26-11-13) Enclosed, in duplicate, is Form P-4, Monthly Report of Drilling and Workover Operations for the above-named well for the month of September, 1977. PRJ:ja Enclosures cc: Well File #17 Very truly yours, BP ALASKA, INC. District Drilling Engineer RECEIVED OCT - 4 ~,l'!,ch,- l~orm 'No, P--4 R.~'V. ~- I-?0" OIL AND GAS CONSERVATION COMMI~EE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT l~ E~PLICAT~ 1. WgLL 2. NA.M~ OF OP~KATO~ BP Alaskn, Ina. ~ ~SD~sbr'o~?o~ . ' ' P. O. 5ox ~-1379, Anchorage, Alaska 99509 4. LOCA~ON ~r w~ At surface: 922'WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM CONFiDENTiAL 50-029-20131 LEASZ DESIGNATION AND S~IAL NO. ADL 28286 Prudhoe Bay Unit %vR~ NO ' Prudhoe Bay, Prudhoe 0il Pool o~ Sec. 26, TllN, R13E, UPM 12 P~IT ~O~ 73-41 13. REPORT TOTAL DEPTH AT F2qD OF MONTH, CHA~NGES IN HOLE SIZE, CASING AND C~MF~NTING JOBS INCLUDING DEPTH SET AD VOL~ US~, P~O~TIONS, ~TS ~ ~SUL~ FISHING JO~ J~K ~ MO~ AND SIDE-~ACK~ HO~ ~D ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~ITIONS September, 1977 Accepted rig 1830 hours, 9/8/77. Installed and tested BOPE. Ran 2 jts. 9-5/8" 47# controlled-yield N-80 Buttress casing with 9-5/8" F.O.C. between, 48 its. 10-3/4" 55.5# controlled-yield N-80 Mod. AB Buttress casing, and 3 jts. 9-5/8" x 11-3/4" Thermocase II and landed at 2108'. Arctic Packed 9-5/8" x 13-3/8" annulus. Displaced well to CaC12. Ran CBL/VDL. Ran inflow test on liner lap okay. Ran CBL log under pressure. Drilled out 7" shoe. Set retainer at 11868' and squeezed 100 sks. Class G. cement. Ran 255 its. 7" 26# controlled-yield N-80 AB-IJ-4S tubing, stabbed into PBR at 10019'. Ball valve nipple at 2006'. Displaced tubing to diesel. Tested tubing to 3500 psi. Installed and tested Xmas tree. Released rig at 2400 hours, 9/19/77. RECEIVED OCT - 4 1 77 , i ;; .,,,Li ,_ , ~ ~ :, ~;;',,'", ..... NOT[ --Report on t~is f~ i~ required for .~ oolendar ~th~ regordless of the status of operatio~, and musf ~ filed In duplieafe wlt~ the ell end gas gonservet~n eommlHee hyt~e 18~ of the euoe~ding ~n~. ~le~ otherwise directed. BP ALASKA INC. 31 1 1 - C - STREET · TELEPHONE (907) 279-0644 CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. O. K. Gilbreth Director MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 August 11, 1977 Gentlemen: BP Well Number A-7 (12-26-11-13) Enclosed, in triplicate, is Form 10-403, Sundry Notice and Report on Wells for the above named well. This report contains our proposal to complete the well in preparation for production. RBV/ja Enclosures Ve~truly yours, ~SKA, ~NC. Drilling Sup~rintendlnt RECEIVED AU6 1 5 1977 Division of Oil ~' 8!.0 G~8 Conservation Anchorage Form 10-403 REV. 1-10-73 Submit "1 ntentions' In Triplicate & "Subsequent Reports" in DbPlicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) NAME OF OPERATOR BP Alaska, Inc. ADORE-SS OF OPERATOR 5. APl NUMERICAL CODE 50-029-20121 6. LEASE DESIGNATION AND SERIAL NO. ADL 28286 7. IF INDIAN, ALLOTTEE OR TRIBE NAME UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. P.O. Box 4-1379, Anchorage, Alaska 99509 A-7 (12-26-11-13) 4. LOCATION OF WELL 10. FIELD AND POOL, OR WILDCAT At surface Prudhoe Bay, Prudhoe Oil Pool 922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 64.69'AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re Sec. 26, TllN, R13E, UPM 12. PERMIT NO. 73-41 )orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF [~ PULL OR ALTER CASING FRACTURE TREAT ~ MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Complete SUBSEQUENT REPORT OF: WATER SHUT-OFF REPAI RING WELL FRACTURE TREATMENT ALTER I NG CAS lNG SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE:= RePort resUlts of multiple completion on Well COml:Hetlon or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent ~letalls, and give pertinent dates, including estimated date of starting any proposed work, We propose to enter this well approximately Sept. 15, 1977, to complete the well in preparation for production from the Prudhoe Oil Pool as per the following program: 1. Tie back 9 5/8" PBR to surface using new 10 3/4" 55.5# CY N-80 casing with three joints of 11 3/4" X 9 5/8" thermocase on top. Arctic Pack Annulus. 2. Test 7" liner lap and change well over to CaC12 Brine. 3. Complete well with seal mandrel in 7" PBR on 7" 26# L-80 Tubing. safety valve, with dual control lines, will be placed at 2000'5. A subsurface 4. Change tubing over to diesel, install and test Xmas tree.. 5. Suspend well for perforating subsequent to rig release, detailing of proposed perforations to be submitted by Sundry Notice to follow. Completion is in accordance with approval granted in letter of July 20, 1976, utilizing 13'3/8" 68# controlled-yield N-80 Buttress casing. CONDITIONS OF APPROVAL, IF AN~: / TITLE _ D.rilling Superintendent DATE TITLE Petroleum Enqineer See Instructions On Reverse.Side DATE 8/16/77 / Division of Oil and Gas / 3001 Porcupine Drive, AnchOrage, Alaska 99501 ! JAY S. HAMMOND, July 20, 1976 G. D. Taylor Manager Operations BP Alaska, Inc. P. O. Box 4-1379 Anchorage, Alaska 99509 Re' Casing Design in the Permafrost Interval Dear Mr. Taylor' Your letter of June 28, 1976, stated that five of your Prudhoe Bay wells had 13 3/8" surface casing strings through the p~rost which included 68 lb/ft,N-80 buttress casing. These wells ar A~_~C~ C-5, C-6' C-7 and C-8. Based on your studies you submit that 13 3-/~T", 68 lb/ft, N- 8O buttress casing satisfies Rule 3(c) of Conservation Orders No. 98A, No. 98B, and No. 83C. The above Rule 3(c) states that surface casing through the permafrost shall have minimum post-yield strain properties of 0.9% in ten'sion and 1.26% in compression. Arco's May 1975 report, "Prudhoe Bay Field Permafrost Casing· and Well Design for Thaw Subsidence Protection", describes results of full.. scale strain limit tests on 13 3/8", 72 lb/ft, modified N-80 (~.lN-80) buttress casing and' of a finite element model calibrated from the tests. Results of Arco's tests and studies indicated 13 3/8", 72 lb/ft, MN-80 buttress casing exceeded requirements of Rule 3(c).~ · One of the prime reasons that controlled yield or modified MN-80 casing was specified in the Arco tests, was to preclude the practice of manufac- turer's substitution For N-80, with higher steel grades which, due to I~tlysical p'rol)er~ies, ·Fail in Arctic ai~plications. ThereFore, apl~roval oF N-~O grade casing 'For sur[ace casiI~g Lhrougt~ the perlna[ros~ requires assurance that other grades 'have not been substituted for N-80. "1776-A llilltUll:. FIIOM OUl:i $1A IE 70 OlJll NA lION. 1976" G. I). layl~r ~. }~. Hamilton -?- -~'~ July 20, 1076 Your studies LISin.(} Arco's finite element mocl61 denlonstrated that failure strain in compression for 13 3/8" 68 lb/ft, MN-~O buttress casing was 4.2%. Results of finite model calculations shown in Table III-1 of the above mentioned Arco report alludes that failure strain in tension for the same casin~] exceeds that of 13 3/F~', 72 lb/ft, ~qH-~O buttress casing. O~r analysis supports this point. Based on these studies, 13 3/8", 68 lb/ft, ~lN-80 buttress casing adequately meets the requirements of P, ule 3(c) of Conservation Orders No. 98A, No. 98B, and Ho. 83C. Sincerely, Hoyle H. Hamilton Acting Director BP ALASKA INC. CONFIDENTIAL P.O. BOX 4-1379 3111 -C-STREET ANCHORAGE, ALASKA 99503 TELEPHONE (907) 279-0644 March 18, 1974 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gent lemen: Number BP A-7 (26-11-13) Enclosed, in duplicate, is Form P-7, the Completion Report on the above well, together with Well Logs, Well History, and Magnetic Directional Survey. The Gyroscopic Directional iSurvey will be submitted when available. lpb enclosures cc: Operations Coordinator, New York Well A-7 #17 Miss D. K. Gudgel ery truly yours, NC. A. K. Howard Manager Operations I974 l:orm P--7 STATE OF ALASKA <See other in- structions on reverse side~ OIL AND GAS CONSERVATION COMMITTEE i i i WELL cOMPLETION OR RECOMPLETION REPO'RT AND LOG* la. TYPE OF WI~LL: on, [~ ~;AS [-~ WELL WELL DRY [---] Other b. TYPE OF COMPLETION': .WEW [] wonK [ DEEP- [] PLUO [ DIFf. [] WELL OVER EN BACK EESVR. Other 2. NAME OF OPERATOR BP ALASKA INC. , m 3. ADDREI{S OF OPERATOR P. 0. Box 4-1379, Anchorage, Alaska 99509 LOCATION OF WELL (Report location clearly and in accordance with any State requirements) atBu~ace 922' WEL, 1700' SNL Sec. 35, T11N, R13E, U?M At top prod. interval reported below 8730 T.V.D. Sag R SST 198' EWL, 2535' NSL, Sec. 26, TllN, R13E At total depth UPM 9068 T.V.D. 206' EWL, 2725' NSL, Sec. 26, TllN, R13E, UPM CONFIDENTIAL 5. API NUMERICAL CODE AP1 50-029-20131 6. LEASE DESIGNATION A-ND SERIAL NO. /U)L 28286 7. IF INDIAN, AJ. JuO~ OR TRIBE NM 8. UNIT,FA-RiVI OR LEASE NAfvIE [PUT RIVER 19. WELL NO. ~12-26-11-13) 'I'I~.~F~EI~D AND POOL, OR WILDCAT PRUDHOE BAY, PRUDHOE 0IL , n. SEC.. T.. R.. ~.. ~mOTTO~ ZOLm POOL OBJEC'rIVE) Sec. 26, TllN, R13E, UPM 12. PEHA~IT ~O. 73-41 Jan, 13, 197~ Feb. 11, 1974| Feb. 16~ 1974 I KBE 64.69' AMSL ~i BFE 45.49 AMSL 18. TOTAL DEPTH, 1VLD & TVD~9. PLUG, B~CK MD & TVLJ~), IF ~LT~LE CO~L., 21. INTERVALS DRILLED BY ~) ~OW ~Y* HOTARY TOOLS % CABLE TOOLS 11,899 ~ (9068"~D~ 11,885 ~ (9055' Total ~. PRODUCING I~VAL(S), OF ~IS COM~IO~, BOSOM, N~E (~ AND ~)* ~. W~ DIRE~O.N~ ~ SURV~ MADE none { yes 24. TYPE ELECTRIC AND OTHER LOGS RUN Schlumber~er~ DIL/S,P~ BHOS/GR~ FDC/CNL/GR~ ETT; CB,L/GR CASING RECORD (Report all strings set in 'well) CASiNG SIZE WEIGHT, LB/FT. DEPTH SET (1VLD) HOI_~ SIZE 13 3/8" Clq.,%T~N'TING RECOi~D ! A~IOUNT PULLED 26. LINER I~EC Ol%D q 5/8" 21 07 1~_562 I 27~75 .~. 7" i ~0028 t "1'1:S94 I 850 .~. 28. PERORATIONS OP~ ~ PRODU~ON (In~, size ~d number) 27. SCREEN (MD) SIZE TUBING DEPTH SET (MD) [ PACKER SET (IVID) 29. ACID, Si~OT. FJLA~CI'i/HE, C'F.,'~IENT SQU~.~.ZV,, ETC. DI~'-~T'I-I II~T]~iRVAL (MD)' A~WlOUNT ;d'qD KIND O,F MA;I~ER.IAL USED 30. PRODUCTION DATE FIRST PIIODUCTION [ PRODUCTION MEII{O'D (Flowing, gas lift, pumping--size and tYP~%~]~f~N~I~0~4 ~,l'~ ~[ '~in~~{~[~S~T~S (~oduc~g or ~OW,~.WBING CA~G P~S~. ]~-HOUR ~[CAL~~ L'OI~BBL' [GA~' [ WA~B~. ~ OIL GRAVITY-~I (CO~.) 31. DISPOSITION OF OAS (~old, used for fuel, vented, etD.) ITgST WITNESSED BY 32. LIST OF ATTAC~I~NTS Well History,~.We11 logs, Magnetic Directional Survey, Eastman Single Shot Survey, INSTRUCTIONS General: This form is designed for submitting a complete and correct v, el[ completion reF,_ort and !o9 on alt types of lanJs and leases in Alaska. item: 16: Indicate which elevation is used as reference (where not o:hervvise s¼o~..r'~! for depth measure- merits given in ether spaces on this for,-,; and in any Items :20, and 22:: If ti~is well is completed for separate prcc].~ction fro'z~ r~o,e th:in one i,terval zone (multiple completion), so state ~n item 20, and in ite,~ 22 sho;., tht~ p,c:]~c :~!~ interval, or ~nte;v~ls, top(s), bottom(s) and name (s) (if any) for only the interv.~! re[>orted ir~ item 30 S'ahr'-~,t a separate report (paoe) on this form, adequately identified, for each add,t~or~al i~te~val to be seperately producerJ, show- ing the ackJitional data pertinent to such interval. Ite, m:26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item :28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ~4. SUMMAI[Y ()[,~ FORMATION TgS'l'.'q IN('I_.UI)IN(; iN'I~'E[IVAI..'-- TF..c3'I'I;~I), t)HEL'q.c;UItE DATA AND~P.~COVERIF~S' ()F ()IL GA-q- 35 GEOLOGIC M A R K ~1~ ~fAT~R AND MUD ~^~r~: B~B sub-sea Sag River FM 11510 8664 (SHAL) Shublik FM 11545 8694 Sadlerochit FM 11636 8772 .qtl. COIqE DATA, A'I'FAcIi BRIEF' i)ES~"I~I'~IT'I'o:Ns 'OF LIT[tOLOGY, PO.FI¢)Sl~TY, F[tACTUKF.,S, APPA. RIENT 'DI~PI~ .a/'Nl~ DE'DECTEI) $11OWS OF Olg. GAS Otl ~,VATE'tl. ~,~:,: WELL HI STORY WELL NUMBER A-7 (12-26-11-13) Ja_._nuarx, _19~74: 13 - 19 Spudded well at 1600 hours, January 13, 1974. Drilled 18 1/2" hole to 2740'. Ran 30 joints of 72¢/ and 39 joints of 68f~ 13 3/8" N-80 Buttress casing with shoe at 2698' with i 1/4" tubing strapped to the 13 3/8" casing from surface to 1837'.. Cemented with 3250 sacks Arcticset and ~displaced with 41 bbls. water. Circulated out 50 bbls. cement at surface. 19 - 31 Tested BOP's. R.I.H., drilled float and ~shoe, ~and tested shoe bond to 500 psi. Directionally drilled and surveyed to 10,566', dropped multi-shot survey and P.O.H. Ran 216 joints of 9 5/8" 47~/ N-80 Buttress casing liner with shoe set at 10,562' and the top of P.'B.R. 2107'. Mixed and pumped 45 bbls. of Howco mud flush, 1500 sacks of Halliburton Light and 200 sacks of Class "G". Lost complete returns with 340 bbls. of displacement away out of 647 bbls. total displacement. Preparing for 2nd stage cementing. Febr~uary, 1974: _ Opened lower F.O. cementer. Mixed and pu. mped 30 barrels mud flush followed by 175 sacks Howco light and 200 sacks Class :"G". Displaced with .73 barrels mud. Closed lower F.O. cementer. Opened middle F.O.' cementer and circulate. Batch mixed 200 sacks Permafrost II, displaced, with 46 barrels mud, and Closed F.O. cementer. Drilled cement plug from 10200' to 10477', drilled catcher sub and landing collar, tested casing to 3500 psi. Ran Sperry Sun gyro survey and ETT log. 5 - 16 Drilled and surveyed to 11899'. Ran 48 joints of 7" 29~ N-80 Buttress casing ' Cemented with 850 sacks Class "G" and displaced wi'ti and set shoe at 11894s 'ing excess 243 barrels mud, rever out cement. Tested 7" x 9 5/8" lap to 1000 psi. Tested 9~5/8" casing to 2650 psi above 3000 ft. Displaced top 2500' of well to diesel. Released rig from A-7 at 0200 hours February 16, 1974. MAR 1 9 I974 / SYMOOL-.OF SErViCE' REPORT of SUB-SURFACE DIR~IONAL SURVEY LOCATION .K)B NUIvlBER TYPE OF SURVEY DATE _n AN 0174 D-6 Single Shot 0:~,0~74 A L D,~',..! F T DIREC '64'., 69 ':..., ..... 48.6.,. 30...N 56, 2~ F,... 13 53 6.. 2 ~w q9 .,.NS~"ZSW z, 2 ~77.75W ~8 N77.75w NT~.43W 95 N 59.59 w 66 N58 · 9 ~W .. ,.,. ,~6', "71 ... i.O~ 2,'! I0 '715,83 ~'~, 60,, 97.5 .~+ 1 L,:.Ii~.05. N 55 52~,87 N 52, 'ALL Tt~UE .'- .~IF.P_?J~..AnN~ L _ D E P T H .. ~ ........... D_ M .... ~.,,.';.__8.~90 ~3 .... 1~ ..... 6.757,93 DEC¢;RD OF CALCUL,~TIONS PERFORV, ED 8Y $U9 DRIFT .SEA. DXDEC DEG, ._ 5~39.56 5811.15 6056,25. 5410,50 7Q~$,58 72~1,~2 , .... 7..71.,'Z.~ 0 2 .... 7 6 D 2,33 1818~96 775~,27 7~61 ,_89 8 ~ %.~., 8102 817.3, 98. 49 ~'7 70 N~5.25W N~B.59W N~4,75w N~4,TSW N~2.75W ..N~O,93W N40,25W N. 38,75W ~28,59~ 1~15~34W N~Z,.COW N 7.75w N.~,75E SURVEY I E ¥ ELECT'~DL If CCYDUTE'~ TOTAL cOoRDIWAT;$ 1713.69 N 1950,51 1950,8.?.~ ...... 2232,59 2251,61N._ 2562.76 2493,8~ ~I 2~29,~i 2@~7e~7 N ~205,55 3062,~9 N, 3~18,71 33~2,~0 N~_ 3686.~8 STANCE 2500. '2~03, 296a. 9411, 3771. 4297. ~976e 5261. DB73e 5598, 5~88. 575~. 50~i, DOG LEG sr--v,. RI TY 5 U R E. S A ~'4 G L E D :,4 S 2,612 2591.29- 0,709 .. 3395,69 0,69~ 375~.~.~g. 0,9.41 ... 0,417 4.572 ~¢' . :? ' ... 165 $ 65, 100 0 .'~:,. :' ;' ' ;..,...B.6~ ................... ~ 6B ,- ....5 00 0 ,~;::;;~L~,..L.L~.~.,.....:.,. :'...: .... :.: .: ..... 7~.:s, _.~o o o e65. ~oo o ,.~:..,';.~ '.1.0.6::5, ..lOOO .. 0 ._1..16'5 ~ .....1.10O .0 . ,1..200 .................... G .......... .13.65..,..'...'....1300:...'. 0. EVERY EVEN ,. ............. 1.565. E~ .... :..:.....16.6 ,~., . .... 1665, :.:,':: ...... 1.,7.65. . . ]. 76 5, .':,,..,,,,.. ..... :~....~.86..~ .................... 1..86 ~ ,... ......:" .". .... '..~.9..6.~. ..... ... 196 5, ;i,.:i.,. :'..,.,::-':.Z°6.~: ...... 2 o ~.,5. ~,,,:..:: ....... 216,5 .......... .-..~ ............ 2..16..5.. ;/~..." '.. :22 &.5 '.. · . .2 Z 55 · · ~ '. ':..;,-'...2~6.5 ........... 236.5. · " "'" '" ...,2.465..,... ~..A...~,.,:../.. ~, &.~,.. ........... · ...... · ' .25.6.5.: ........... 2565, : ..... ! ............ 2.66,9. ' ...2..66.~, Z.;,....,,.,.-.,....:..,~,7..6 ~ ........ ' ' . ...... ,Z.7. 6.5..,.. "' .2.8.6..5: ..... 2 $ 6 5. "' ...:,'.:....29..6 ? ' . .... 2.-o.65 '. ~.,~..:.,,:,:,,,,..:,~ .... ~.~.6........; .......... ~,.0.6.~ ,. i:,:,'.,. :: ........ ~ 1 ~ 8 ................. 3. !.6 ~, ':':" '. '327Q.,... .,;~;.,.,:,...'.: ...... ~ ,'7.. 2,, ...... 3. ~ 65 ,,. ,:.', :.' '-., .,.. ~ ,o~' ........ ;,. ...... .~...,. ;'. .......... ,4.' 3..~.?.5 ...................... 3~65, "" ' :~.~..8...0 ......... · ' . .... 3.5~.5....,.. .:7! 500 1500 1700 ... 1.~.00 1900 2.000 ..... :2,1.C O 2209 2300 .2400 2500 .2~.,00 .... 2.7.0..0.. 2~.00 2900 3100 320O 330 ·350 ,.. 100 F£E:T OF 5U~ SEA .v. EP.T I..CAb .... COR~,.CT IOIN TCTAL 0 DEPTH. _ . CS~RD INA-ES (...iZ N 0,1":' ],55 :'~ 2.95 ;~ 1,4t 1.39 I" 2,10, ,1,6.~,.;~ 2,95 1.57 ~ 3.9~ 1,05 N C,8.7..~ 1,.,.~ ~ ~" ' Ji~ ......... 2,39 6,7.6 !1.1.6 13,5.~! S 34, ....... ~.~ 7.6 S ............ ~.0,,,,19 2,78 $' 82,90 Z, 9'7.....N .... 99 ,O0 .:-::' · ,, ,,,,,,',,, i" 'h' ........................... ~" ': ....... : ..... ' ' ,.F' ,.,, ............. ,,:;. .. ,. , . ,.. ,¢% i..~.,~'.,5.URE.,D_ D.t~PT.]':,t ANb O"rHE~ DATA ·FOR EVER"' £\,'EN - . T~UE ..,~?,~tE.,ASURED~.,. ........... V.f:,'RT.ICAL. SUB MD-T ;;:,,,L, · .... ~6'B :7. ... 3665, 3600 _ . VERT I CAL CORRECT ION OF .... 3?00 30 8 4000 71 ..,6.1~0, 15200 677 ..5300.. 757 f' - ,;,,(;, 1 ............... , ................ ~ .o&:,,,,; ~. ........ . ..................... ~. I .... · ' 8~:)..6, 666,5. .5¢.o0 :"" 7,'"' .... [ ":' .: ..... , ~% ' ' ' . ~ . , 8671 6865, .),,,~:...¢,,.k,~ ........ i .......... )..... ................. · ....·, ............ .. m '80 ...... 81 ',7~. .:. 17:5 i,_ ...... ,6.. e.I · , ..... 6.,5 . · "7, O ,., ........ , .......... , ..... ~, i. 1.82.1: :.:. ,i .. .... , ..... - .............. . ............ .C.,,,,: ,,.,.o... ,,.;, .... ...... ...., .......................... ,,¢ m~:` m .. m 9029 7065, 7000 1964 r~ '~ ~,;, ',~:': ............................... ,' , ............... .. 3'¢:i.,*'"," '.,.." '. ' · . . ". ' .,',,'~,,~,,.:U-,.- (...,.:- ..................... ~.: ....................................' SEA 203,9C ~', ~O'e,., 69 N .689 ,.89 5~9,5,3 N, ,839,57 6~3,,59 N 929,.03 7~a. 5'8 ~:' i030.18 .,.:.8.5 b:,,3,7, ,¢~.:,1131.6& 960,8.6.,N' 123'6,6.5 1395,01 ,f:4 '. 1;6'~6,3 5 ~ "~ ........ 19.82,08 ..N, 2267', - '- '- TRUE :,~;, -.~' , . .:....., ,, ,,. . , . ME.A,JtJRED · VERT I cA.!,...S.U~ ......... M'.'~',.TV'.D '. ~'~"~",.~.~,."~ -'~".~"~.,, ,, ,'""-?".~lI".-, "'~'t,,, -,~ ,, ','~---,, ': ...... - ............ ,, · &,.. ,~. ~ -. '.: ~21~ 71e5. 7100 2051 ',:., .:,, .;,?:.. 20 ~.~. ' .75..~.5. 7500 23.~9 ,.~, ....... : ..... kO.[~.I. ................. 76.6 ~, ........ 7 & ~0 2 ~ 2 Z ' .:d. ,..:[0 ¢h'2'_:, , '. ............... r37..65 ': . .7700 .... 2 677 ..................... 84.65, 8 ~0.0 ...~ 27,23 '. ..,8.6.00,. :, 2',?68, ._,',,,,,. 8 B ~C ....... Z,,e.O ~ ,., ...... ,.... ~ ..... :"~: :'" 8965, '890.0 2918 . .............. :.i i .............. :..' ....... o, e.o o o ..' :2 i ......... ¢4.¢._.~,;~ .............................................. : ............... : ~ . ..... :.. -,... , ~,~ , · ,,¢ %c:'...': ,r':[:;,.; .', ,,~.:. ". . ' . ..',?,. ':'.. ~T;%i'.'...~.,>:L.,~.. ;' . ..,:' .i.:. 3:: ,.:.' ~: ..... :: ................................. .......... .-...¢ .,.. .... , ....... : .............. .. ....... , · : .....¢ ........ . ................ , .... .... ~:.,. .................................................................. . .:.. .. ~ ........ , ........ · ,.:,....,,: ...... .' . '. ....... . , r. .... , .. t ,. .~:...~ ....... .s .,&... ~ :....' .............. · . ...... .. ............ .',..'. ............. ~.,., ....... ~ .............. ~.. 4, ......... ~ ................ ................................ ',; TO"~. COORDIN'A'rE$,. ...87 · 290i.: .67 :_,¢, .% 72.25 34, ": ~, i i ~ 7 5 '?. O 7 383.3.9.0 3907,~5 3970 ..8....¢ ¢.027. ZU /-+S77.78 ~1 l 1,. 41ZgaS. 8 4..14.3.85 4,1.5.3 .,,':~,..0 ,,:,.'- 15 !~, 51 4163. '<,, I r..: 9.5, ?, ~.i 50.79 ,i~~s~,'- ~ Z. .., ,. --- , . . : , ,~ .... : ....... :. ., .. ......... :..,.?,:-. /-: ..... L.:..%OO0 -. 999, 9.35 ,. O,~ ::~::~,;~;~.,, ............. :..~.Q&¢ ................... ~99g.... 1935., . ..1 ~,~ 5.. ',': ;,.;,. ,,:,: ;,','., :':.,.:~.-;,..., .3.0 ~ 0 ..... ~ 997, .2933, 8 e'.~2 · ,,~',-~. .............. ,~.~.0,0~.'..; ............ ~7.g. 2.'.~.. ¢85.7. ...~..~.~,~.~ ,..:~,[jL, LL,:,:,, ' ~,~.00~ .... ". ............ ~.~ 9,6. ...... 5~31 · ,11o. 5 .'6~ ~',;?,-. . ... ¢ '. . · . . . ~ ~- ,;. :, . ~ . .. , ..~ :,,f~,.,., ~ ~ .... ~ , ,., , .. ,. , , , %';~"'"':'"";?:~ '''~ ~'~'"' :' '" '"" "' 8,3~ ~"7. 'g~.,¢~~'s " '"~2 n' 8 ' .~,~:~,~:~ '?,; ,' ,~.,....:.:,,. ¢~. ~ . ,, '( ,. , . , , '" "iii ,.~ '~',,'~ ",,. ~ "~" ':,'~ ' ~',' · '; , - ,~ "' ' . ' "' :' ' ' ................ . ~,,~,;, ,, ,~., , ,;,-, , , ; , ,. , , , ,' ¢,:,fi? :;",.,., ...... , ~,. ,,,.....;' ,.., , . . ..,.. BP ALASKA INC. CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-13'79 3111 - C - STREET ANCHORA(~E, ALASKA 99503 TELEPHONE (907) 279-0644 March 11, 1974 Attention: Mr. Homer L. Burrell, Director Gentlemen: Well Number BP A-7 Enclosed herewith please find in duplicate Form P-4, Monthly Report of Drilling and Workover Operations for the above described well. lpb cc: Operations Coordinator, New York A-7 Well File #17  ery truly yours, Alaska Inc. A. K. Howard MAR 1 3 1974 DI¥1SION OF OIL ANt) gAS STATE ~T~" ALASKA OIL AND OAS CONSERVATION COMMI]-[EE MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS WELL SUBMIT IN DUPLICAT~ 2. NAME OF OP~%ATOR BP ALASKA INC. 3. ADDRESS OF OPERa, TaR P. O. BOX 4-1379, Anchora~e~ Alaska 99509 4. LOCAT~0N OF WELL 922' WEL, 1700' SNL Sec. 35, TllN, R13E, UPM 'VC O N F I D E N T I A L AP! NUAIERICAL ~ODE 50-029-20131 LEASE DESIGI~ATION A.~-D SE]RIAL NO. ADL 28286 IF INDIA]~, ALOTTEE OR TRIBE NAME 8. L~IT F.~rtM OR LEASE NAME PUT RIVER g %VELL NO A-7 (26-11-13) 10. FLELD A-ND POOL, OH WILDCAT PRUDHOE BAY, PRUDHOE OIL POOL 1~ SEC, T., R., 1%~. (BO~I~OM[ HOI~ o~ Sec. 26, TllN, R13E UPM Ii, PERMIT NO. 73-41 '"13. REPORT TOTAL DEPTH AT F_~D OF MONTH. CHA. NGES IN HOLE SIZE, CASING A1N"D CL'MENI'ING JOBS INCLUDING DEPTH SET AND VOL~ USED. PE, H~OHATIONS. TESTS AND HESULTS FISHING JOB~ JUI~K I2q HOLE AND SIDE-T1R. ACKED HOLE AND ANY OTHER SIGNIFICAJ~IT C'[-LA/~G~ IN HOLE CONDITIONS F.e.b. ru. ar~y,~ ..1.97_4: 1-5 Opened lower F.O. cementer. Mixed and pumped 30 barrels mud flush followed by 175 sacks Howco light and 200 sacks Class "G". Displaced with 73 barrels mud. Closed lower F.O. cementer. Opened middle F.O. cementer and circulated. Batch mixed 200 sacks Permaforst II, displaced with 46 barrels mud, and closed F.O. cementer. Drilled cement plug from 10200' to 10477', drilled catcher sub and landing collar, tested casing to 3500 psi. Ran Sperry Sun gyro survey and ETT log. 5 - 16 Drilled and surveyed to 11899'. Ran 48 joints of 7" 29~/ N-80 Buttress casing and set shoe at 11894'. Cemented with 850 sacks Class "G" and displaced with 243 barrels mud, reversing out excess cement. Tested 7" x 9 5/8" lap to 1000 psi. Tested 9 5/8" casing to 2650 psi above 3000 ft. Displaced top 2500' of well to diesel. Released rig from A-7 at 0200 hours February 16, 1974. MAR ! 3 1974 8IG~ ~ ~ DA~ ~, ~, Howara _. NOTE--Regort on this fo~ is required for ~ch calendar ~th% regardless of the status of operotiofls, o~d must ~ flied in duplicate with the oil and gas ~onservatlon eommi~ee b~the 15~ of the suec~ding mon~, ~le~ Otherwise directed. DIVISION OF OIL/tND/]AS ANCHOtJAI t ~r~m M~nager Operations BP ALASKA INC. CONFIDENTIAL State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Aal ska 99504 P.O. BOX 4-1379 3111-C-STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 February 12, 1974 J sec J CONFER: FILE: Attention: Mr. Homer L. Burrell, Director Gentlemen: Well Number BP A-7.. Enclosed herewith please find in duplicate Form P-4, Monthly Report of Drilling and Workover Operations for the above described well. lpb cc: Operations Coordinator, New York A-7 Well File #17 ,, tVery truly yours, KA INC. A. K. Howard Manager Operat l"mrm N'o. RL"V. STATE O~"~AI.A~ KA OIL AND GAS CONSERVATION COAAAAIr[EE MONTHLY RE:PORT O'F DRILLING AND WORKOVER OPERATIONS WKLL WI;L~ 2. NAME OF OPERATOR BP ALASKA INC. P. O. BOX 4-~79, AnchoraSe~ A~aska 99509 '4. ~CA~ON OF W~L!~ 922' WEL, 1700' SNL Sec. 35, TllN, R13E, UPM SUBMIT IN DUPLICA~ !'%~,~C 0 N F I D E N T I A L § APl NUMERICAL ~ODE ' 50-02 9-2 0131 L~SE DESIG~A~ON A~D S~IAL NO. ~L 28286 IF INDIA~ A~/~EE OR TRIBE NAME L~IT.F~{ OR LEASE PUT RIVER , 9 WE~ KO ~ A-7 (26-11-13) PRUDHOE BAY, PRUDHOE OIL POOL 11 SEC , T., R.. M. (~OM o~ Sec. 26, TllN, R13E UPM 12. P~IT NO 73-41 ~EPORT TOTA'L ~]gpTH AT F~'D OF MONTH, CH.A.NGES IN HOLE SIZE, CASING AND C~2VIEN.'rlNG JOBS INCLUDING DEPTH SET AN~ VOLU1VIES USED PERFORATIONS. TESTS AND RESULTS FISHING JOB~ JU/%TK IN HOLE AND SIDE-TP~ACKED HOLE A2qD A.NY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS Jan_ua r.3_,_ .1~77: 13 - 19 Spudded well at 1600 hours, January 13, 1974. Drilled 18 1/2" hole to 2740'. Ran 30 joints of 72# and 39 joints of 68# 13 3/8" N-80 Buttress casing with shoe at 2698' with 1 1/4" tubing strapped to the 13 3/8" casing from surface to 1837'. Cemented with 3250 sacks Arcticset and displaced with 41 bbls. water. Circulated out 50 bbls. cement at surface. 19 - 31 Tested BOP's. R.I.H., drilled float and shoe, and tested shoe bond to 500' psi. Directionally drilled and surveyed to 10,566', dropped multi-shot survey and P.O.H. Ran 216 joints of 9 5/8" 47# N-80 Buttress casing liner with shoe set at 10,562' and the top of P.B.R. 2107'. Mixed and pumped 45 bbls. of Howco mud flush, 1500 sacks of Halliburton Light and 200 sacks of Class "G". Lost complete returns with 340 bbls. of displacement away out of 647 bbls. total displacement. Preparing for 2nd stage cementing. [4. I hereby certi ~otn~ i~ true ~ correct SIGNED ~ ---' ' i, i UTU~ . ..Manager Op.~rations NOTE--Report on this form is required for ear. It calendar month~ regardless of tho status of operations, and must bo flied in duplicate with the oil and gas conservation committee by the 15th of the succeeding month, uflleas Otherwise directed. BP ALASKA INC. CONFIDENTIAL P.O. BOX 4-1379 3111 -C-STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907) 279-0644 February 7, 1974 I DRAFT I sec I CONFER: FtL~: State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Enclosed please find, in triplicate, Form P-3, Sundry Notices and Reports on Wells, for the above named well. This report contains our proposal to suspend the well pending design of production facilities and downhole completion arrangements. The well status is outlined in the report. ery truly yours, A. K. Howard Manager Operations lpb Enclo sure s cc: Operations Coordinator, New York Well File A-7 f/17 FEB 8~74 Form HEV, STATE OF ALASKA 922' WEL, 1700' SNL, Sec. 35, TllN, R13E, UPM Submit "Intentions" in Triplicate & "Subsequent Reports" ha Duplicate ~' 13. ELEVATIONS (Show whether DF, RT, OR, etc. KBE 64.69 AMSL BFE 45.49 API NUM_F, RICAL CODE 50-029-20131 OIL AND GAS CONSERVATION COMMITTEE 6. LEASE DI/IC:LIGNATION AND SERIAL NO. SUNDRY NOTICES AND REPORTS ON WELLS lDo not use this form for proposals to drill or to deepen ADL 28286 use "APPLICATION 'FOR [°'EI~i'~'~-' 'for such 'pi;o~osal~,) 1. ?. IF INDIA.N, ALLOTTEE OR TRIBE NA.ME ()IL H GAS [] W ELL W r-LL OTHER 2.NAME OF OPERATOR S. UNIT, FAR1VI OR LEASE NAME BP ALASKA INC. Put River 3.ADDRESS OF OPERATOR 9. VvELL NO. P. 0. Box 4-1379, Anchorage, Alaska 99509 A-7 (26-11-13) 4.LOCATION OF W~. I0. Fm~ ~rr~ roo~.. OR W~CAT At ~,~.r~c~, Prudhoe BaT, Prudhoe Oil Pool n. s~.c., T., R., ~.. (~o~roM ~o~ OBJ~-CTIVE ) Sec. 26, TllN, ~3E, UPM - 73-61 Check Appropriate Box To Indicate N, at-ure of N~tice, Re ~ort, or Other Data ' NOTICE OF INTENTION TO: TEST WATER I~HUT-0FF PULL OR ALTER CASING i FRACTURE TREAT MULTIPLE COMPI.ETE SHOOT OR ACIDIZE J J ABANDON* REPAIR WELL CHANGE PLANR ~ tOther) Suspend IX. J I,qUBSEQUENT REPORT OF: WATER SItUT-OFF _J REPAIRING WELL SHOOTING OR ACIDIZING , , ARANDONMEI~T* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR C0.MPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Current Status: Surface Casing ; 13 3/8" 68#/72# N-80 Buttress Casing at 2698' MD cemented to surface Intermediate Liner : 9 5/8" 47# N-80 Buttress Casing at 10,562' MD, cemented to top of liner at 2107'. We propose to suspend the subject well pending construction of surface facilities. The well status will be as follows: Total Depth ~ Casing : Approximately 11,800' MD (9068' TVD) : 7" 29# N-80 Buttress casing from T.D. to approximately 10,062' MD which will provide an Overlap of approximately 500' inside 9 5/8" casing. Approximately 450 cu. ft. of Class "G" ceme~ ~ ~ ~ ~ ~ ~ ~ F-'E6 - 8 i974 Cemented With Manager Operations I hereby cert~fL~tlthe fore~oin~ i, true and correct S~GNED ~-- _, ,, - ^_ ~_ ~:_:~_-"_.4 ~ APPROV~D B~ ~ ~ ~ co~D~o~s o~ppaoVi~, I~ ~ :~ - TITLE See Instructions On Reverse Side BP ALASKA INC. P.O. BOX ~1.- 1379 3111 -C-STREET ANCHORAGE. ALASKA 99503 TELEPHONE (907! 279-0644 December 18, 1973 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 At tention: Mr. Homer L. Burrell, D ir ec to r Gentlemen: ~el.! ~mb~er. BP- ..A.~7 .. (26-11-13) Well A-7 will be spudded on or about January 9, 1974, as outlined on Form P-l, Application for Permit to Drill, Deepen, or Plug Back, approved November 24, 1973, after completing operations on Well C-3. lpb cc: Operations Coordinator, N.Y. Well File A-7 #17 Very tr~yours, BP INC. t ~ h' ~L. O..~ay ict Manager OEO o ~, I973 Hr. A. K. Howard ~P AIaska I nc. P. O. ~ox 4-1379 Anchorage, Alaska 99,5O9 Oear Sir:; Enclosed Is the approved application for pemlt to drl I I the above, referenced welt on or' abou~ ',November 24, 1973, at a Range !,3E, [~,M. and core chips are not requ'tred. A dtre~le~at survey Is rivers tn Alaska and 'their d'ral,,a,qe systems ha~ ,b~n classified as t~o,~ for the sp~nlng or mlgra+l~ of anad~~ fish. Ope~+lons )n Poll'~tlo~.of a~y v~f,e,f~ of fha Sta~ Is pmhtbtf~ by AS 46, Chop~er 03~, A,~lcie 7 :~,d t~ ~g'u la~l~s p~ ig,ated ~ereunder (Tlft~ t 8:,, A :taska Adatntsfm,flve Oo~,. Chap~r ~) and by ~he FeSe~,l ~eter Poll~l:o~ C~trot Act, ~ ~en~d Pr,lot fo ~enclng. opemttms, y~ ~y ~ tn the event of suspe~slon or abandoneen~ please give ~,Is off'Ice ,adequate ad~ance ~ottf~catlon so tha~ we may have ,a ~.ltm~ss prese:n~. Very truly: yours, BP ALASKA INC. P.O. BOX 4-1379 3111 - C - STREET ANCHORAGE. AJ-A,~ 99503 TELEPHONE (907) 279-0644 November 9, 1973 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Homer L. Burrell, Director Gentlemen: Well Number A-7 (26-11-13) Enclosed please find the following documents: 1. Application for Permit to Drill Well A-7 (26-11-13) 2. Proposed Drilling Program Outline 3. Our check in the amount of $100.00 to cover the permit filing fee. 4. Three copies of surveyor's plat showing well location. ,A Very truly yours, ASKA INC. · ~Howar--~ Manager Operations lpb Enclosures cc: Operations Coordinator, New York Well A-7 (26-11-13) Form 10-- 401 , BEV, I--I--71 1~. TTPi~ 0~' WORK SUBMIT IN TR[PLIC, (Other instructions reverse side) STATE O,F ALASKA OIL AND GAS CONSERVATIO'N ,CO'MMITTEE PERMIT TO DRILL OR DEEPEN DEEPEN [-J b, TYPE0~' WILL o,,. X °'" 1-1 WELL We-LL OTHRR ZON~. ZONE 2. NAME OF OPEI:LATOR BP ALASKA TNC. 3. ADDRESS OIF OPERATOR P. 0. BOX 4-1379, ANCHORAGE, ALASKA 99509 4. LOCATION OF WELL At surface 922' WEL, 1700' SNL Sec. 35, Tll.N, R13E UPM 112' EWL, 2467' SNL Sec. 26, TllN, R13E UPS 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* 100 Miles N.E. of Umiat AP I 50-029-20 5. 6. LEA. SE DESIGNATION A_N'D SEIT. IAL NO. ADL 28286 IF INDIAN, A. LLO~ OR TRI~E NAM, E 8.UNIT, FARM OR LEASE NAME PUT RIVER 9. WELL NO. A-7 (26-11-13) 10. FIELD AND POOL, OR WILDCAT PRUDHOE BAY PRUDHOE 0IL POOL !1. SEC., T., R.. M., (BOTTOM HOLE OBJECTIVE) Sec. 26, TllN, R13E UPS 12. 14. BOND INFORMATION: STATE OF ALASKA DL-11 TYPE BLANKET Surety and/or No. VIlDF, RAT TN.qITI~AMC. F. C./3_ g01 ~--77--1/, ,, 15. DISTANCE PROM PROPOSED' ' 116. NO. OF ACRES iN LEAS~ - LOCATION TO NE~,REST ' f * · ~. rom West lzne o (Also to nearest dr(g, unit, if any) BP LEASE ADL 28286J 2560 1~'. DISTANCE FROM PROPOSED LOCAT'ION* ~ J 19. PROPOSD DE'PTTI To NEAREST WELL mmmLING. COMPnETED.252g, t:rmr, ! OR APPLIED FOR, FT. ~' ....... ! _ , ~ _ BP WELL A-3 (27-11-13) {A!iS00 MD (9068' TVD) ~mo,,-t $100,000'00 17. NO. ACRES ASSIGNED TO THiS WELL. 320 20. ROTARY OR CABLE TOoLs Rotary 21. ELEVATIONS (Show whether DF, RT, CH, etc.} ~-~-. APPROX. DATE WORK WILL START* ESTIMATED KBE 66' AMSL November 24, 1973 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE ,SIZE OF CASING WEIGHT PER FOOT ,. GRAI)E SETTING DEPTH quantity of cement '18 1/g" 13 3/8" ,~8# & 72# w-Rn 9~on' 9Aom'3600 cu/ft Arcticset Cement .12 1/4" g 5/8" 47# W--Rm 10783' 8410 2800 au/fi Nalllhurton 1 i~bt +. 20( 8 l J2" 7" 29# N-80 11795 t g063 450 m~/ft C1 aaa. "~ z~o ~ e~C~ cu/ft /=.'/I-.T , IN AlE )VE SPACE DI~CP,.IBE ]PROPOSI~D PROGRAM: If proposal is to deepen 'give data on present productive zone and proposed new pi )'duce. lye zone. _If .p._ro_po. sgl is_ iq. cirlll_ or ~eepen cllreet]onally, give pertinent data' on stibsurface 10c~tiorts a~ld .measUred and true 'yeti(cs Ldettbs. Give-blowOt~t preve.nter program. '"- 24. I hereby ~/~that the Foregoing is True and Correct ~l~ --~[m'-'~m '  _.. . ~ c{ 7~ Manager Operations DAT~. TITLE SIGNED ' t~ ......-1 ,. ................... (This space for State office use) CONDITIONS OF A.PPIROVAL, IF AH: [ SAMPLE~ AND CORR CHIPS RF_~UI.R~ M,U,D LOC; OTHER I~.E~UIREMENTS: [] ~ )~o [] Y~ j~ ~o SEE TRANSMITTAL LETTER DI~CTION.~.L SURVEY RE~Lr[I~ A.P.L 1N'UI~CAL CO~ l~,~ m .o ,5-0 - ~ z ¢ - ~ p,m~r~ ~~ ,u,r~ov,a, oA~ November 23, 1973 %raovrn~ J; ~. Chai ~an o.~ November 23, *~ In--on, ~ Rev,~ Side 1973 WELL BP A-7 (26-11-13) PROPOSED DRILLING PROGRAM OUTLINE Dry bucket 24" hole to 80' _+ below ground level and cement 20" conductor to surface using Arcticset cement. Drill 18 1/2" hole vertically to 2700' + BKB and cement 13 3/8" casing to surface using Arcticset cement. Install 13 5/8" 5000 BOPE. Drill 12 1/4" hole directionally to 10,783' MD (8410' TVD) + and cement 9 5/8" casing in stages to top of liner at 2100' + with Class "G" Halliburton light and Permafrost II cement. Drill 8 1/2" hole directionally to T.D. at 11,800' MD (9068' TVD) and cement 7" casing to top of liner approximately 500 ft. inside 9 5/8" shoe with Class "G" cement. Suspend well for later completion. Displace top 2500' + of well to diesel. Blowout preventer program consists of 5000 W.P. pipe rams~ blind rams, and bag preventer from the 13 3/8" casing point to T.D. 3O 4O ~o 3o ---- 40 I0 I 5'0 '$o 40 i / / ii i~ I ~ · SECTIONS 25,26,27,34'35 8~36 SCALE 1"=1/2 MILE ($6-11-15) (26-11-/3) 6 32-25- Il- I$ "1 ~ 4g-34- I1 - 13 MAIN · 23 -25- II - 1,,3 SUMP 44 -~'-I/-I$ ~ 4/-$~-I1-15 I VERTICAL -- _ ACCESS P/L ROAD CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat representsa location survey made by me or under my supervision, and that all dimensions and other detoils ore correct. Date sURvE~/6R ' ARcHORAG~; PAD DETAIL , SCALE I"= 34X)' ~ACTUAL TO A-I thru A-6 10-30-73 H.S.K. PROPOSED TD A-?, A-8 10-30-75 H.$.K. TOP SAG RIVER FORMATION A-6 2-24-72 A.L.L. TOP SAG RIVER FORMATION A-5 , REVISED 2-17-72 M.L.S. TOP SAG RIVER FORMATION A-5 2- 3-72 M.L.S. TOP SAG RIVER FORMATION A-4 REVISED A-I, A-2 1-13-72 M.L.S. TOp SAG RIVER FORMATION A-$ 12-4-71 M.L.S. *TOP SAG RIVER FORMATION A-;~ I1-11'-?1 M.L.S. ~TOP SAG RIVER FORMATION A-I, REVISED NAME 9-3O-71 M.L.S. ~BY GYROSCOPIC SURVEY PAD "A" LOcated in SurVeyed for B. P. ALASKA INC , Surveyed by EM. LINDSEY t~ AssOc.. LAND & HYDROGRAPHIC SURvEYo'RS 2502: West Northern Lights Boulevard Box 4.-081 i~nchorage . Ale,, CHECK LIST FOR NEW WELL PERMITS Lease & Well No. Yes No Remarks Is well to be located in a defined pool ................. ~~ , ) Do statewide rules apply .e · · · · · · · · · · · · · · · · · · · · · · · · Is a registered survey plat attached .................. Is well located proper distance from property line ........... , Is well located proper distance from other wells ............ Is sufficient undedicated acreage available in this pool ........ l. Is well to be deviated ......................... /~ 3. Is operator the only affected party ................... .~. Can pen~it be approved before ten-day wait ...... ; ........ I0. Does operator have a bond in force ................... Il. Is conductor string provided ........................ 12. Is enough cement used to circulate on conductor and surface ..... 13. Will cement tie in surface and intermediate or production strings 14. Will cement cover a.ll possible productive hori'zons .......... 15. Will surface casing cover all fresh water zones ........... 16. Will surface csg. internal burst equal .5 psi/ft, to next string .... 17. Will all casing give adequate safety in collapse and tension ...... _ · · · · · · · 18. Does BOPE have sufficient pressure rating ...... -.. Additional Requirements: y~..~.~..c/ ~l~o~? C~U~m.~ o~ /~-~zo/ ~ .~.~./~-~,,~//~/ ~roval Recommended: ....... ' " ' ..... ' JAL LCS