Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
176-070
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, November 24, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 09-08 PRUDHOE BAY UNIT 09-08 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 11/24/2023 09-08 50-029-20230-00-00 176-070-0 G SPT 8413 1760700 2103 2275 2282 2278 2276 5 5 7 7 4YRTST P Brian Bixby 10/10/2023 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 09-08 Inspection Date: Tubing OA Packer Depth 31 3099 3008 2966IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB231011071108 BBL Pumped:8.1 BBL Returned:7 Friday, November 24, 2023 Page 1 of 1 MEMORANDUM State of Alaska Permit Number: 176-070-0 Alaska Oil and Gas Conservation Commission TO: Jim Regg�j� i ©�. I Z' l DATE: Thursday, October 17, 2019 P.I. Supervisor�`"' i t� SUBJECT: Mechanical Integrity Tests Packer Depth Pretest Initial BP Exploration (Alaska) Inc. Well 09-08 FROM: Jeff Jones PRUDHOE BAY UNIT 09-08 Petroleum Inspector 8413 '" Ste: Inspector Reviewed By: P.I. Supry NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-08 API Well Number 50-029-20230-00-00 Inspector Name: Jeff Jones Permit Number: 176-070-0 Inspection Date: 10/7/2019 Insp Num: mitJJ19100908564I Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-08 pType Inj w TVD 8413 '" Tubing 11 '3 no3 naz - uoz PTD 1760700 " e Test SPT Test psi 2103 IA 33 2498 2471 "� 2456 " BBL Pumped: 5.4 - BBL Returned: 5.t. OA 9 7 a ]o Interval I 4YRTST P/F P Notes: I well inspected, no exceptions noted. Thursday, October 17, 2019 Page 1 of 1 (s,--0-16 • Z(o2_Q7 WELL LOG TRANSMITTAL#904459231 To: Alaska Oil and Gas Conservation Comm.RE EI January 31, 2018 DATA LOGGED Attn.: Makana Bender M.K`BENDS 333 West 7th Avenue, Suite 100 FEB 0 2 2018 Anchorage, Alaska 99501 RE: Injection Profile: 09-08 AOGCC Run Date: 11/23/2017 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 09-08 Digital Log file 1 CD Rom 50-029-20230-00 Production Profile (Final Field Print) 1 Color Log 50-029-20230-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. SCANNED , 4 Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com& AKGDMINTERNAL@bp.com Date: Signed:Gyt'„ `e...eat • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday,October 30,2015 TO: Jim Re gg '�" 1//3�� P.I.Supervisor ( SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 09-08 FROM: Johnnie Hill PRUDHOE BAY UNIT 09-08 Petroleum Inspector SCANNED 'i ;I 0 .' i ir`, Src: Inspector Reviewed By: P.I.Supry-- 2— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-08 API Well Number 50-029-20230-00-00 Inspector Name: Johnnie Hill Permit Number: 176-070-0 Inspection Date: 10/28/2015 Insp Num: mitJWH151029113627 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-08 - Type Inj W" TVD 8413 - Tubing 1514 " 1482 "I 1462 - 1478 - -- - - -_— PTD 1760700 . Type Test SPT Test psi 2103 - IA 854 -i 2500 - 2481 - 2472 " Interval r4YRTST P/F P /' OA 384 saa _Lss3 sss. — _ ' Notes: 3.7 bbls of diesel used Friday,October 30,2015 Page 1 of 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelIIntegrityCoordinator@bp.com> Sent: Friday, October 23, 2015 9:28 AM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Superintendent;AK, D&C Well Services Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Specialists; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Drotar, Mark; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers, Jessica; Dickerman, Eric; 'jim.regg@alaska.gov' Subject: UNDER EVALUATION: Injector 09-08 (PTD #1760700) Ready to be Placed on Injection All, Injector 09-08 (PTD#1760700) was due for its AOGCC witnessed MIT-IA in May 13, 2015 and is now ready to be placed on injection. The well has been reclassified as Under Evaluation to facilitate compliance testing. Please use caution when bringing the well online as the annuli are fluid packed. Plan Forward: 1. Operations: Place well on injection 2. Downhole Diagnostics: Once thermally stable, perform AOGCC witnessed MIT-IA Please call with any questions or concerns. Thank you, Kevin Parks A{ter„atC' lti'hitr�F,�nerruc� SCANNED AUG 1 7 2016 BP Alaska-Well Integrity Coordinator GWq Giobai Vv'eiis V Y Organization Office: 907.659.5102 WIC Email:AKDCWeIIIntegrityCoordinator@bp.com From: AK, D ell Integrity Coordinator Sent: Friday, May ,2015 5:54 PM To: AK, OPS FS2 OSM; AIS, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS PCC EOC IL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Sp lists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Drotar, Mark; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C ell Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; 'jim.regg@alaska.gov' Subject: NOT OPERABLE: Injector 09-08 (PTD #1760700) Due For AOGCC MIT-IA All, Injector 09-08 (PTD#1760700) is due for an AOGCC MIT-IA on 05/13/2015. The well will not be on injection for the test due to surface equipment problems. The well is reclassified as Not Operable and will be addetto the quarterly Not Operable Injector Report until the surface equipment issues are resolved. 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Friday, May 01, 2015 5:54 PM To: AK, OPS FS2 OSM;AK, OPS FS2 DS Ops Lead;AK, OPS FS2 Facility OTL;AK, OPS FS2 Field OTL;AK, OPS PCC EOC IL;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead; Cismoski, Doug A;AK, RES GPB East Wells Opt Engr;AK, OPS EOC Specialists; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Drotar, Mark;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Regg,James B (DOA) Subject: NOT OPERABLE:Injector 09-08 (PTD#1760700) Due For AOGCC MIT-IA Attachments: image001.png All, Injector 09-08 (PTD#1760700) is due for an AOGCC MIT-IA on 05/13/2015. The well will not be on injection for the test due to surface equipment problems. The well is reclassified as Not Operable and will be added to the quarterly Not Operable Injector Report until the surface equipment issues are resolved. Thank you, Kevin Parks (Arta nota tt// ,t i ), FtttHs) SCANNED MAY 0 4 2015 BP Alaska-Well Integrity Coordinator GVVGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com 1 bp RECEIVED VIE, 401� AUG 21 2014 AOGCC BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA LOG DATA) Date 21 -Aug -2014 Transmittal Number: 93373 If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing OPEN HOLE Digital Log Data: 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-11, B-24, B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 The information on this CD is to be used for BP Exploration (Alaska) Inc. business only. If you are not the owner or licensed user of this CD, any disclosure, copying or use of the information on this CD is prohibited. If you obtain this Angela K. S; CD by error, please return the CD to the address shown g below. BP will pay the postage. Thank you. Please Sign and Returf gancpdc@bp.com Doug Dortch Petrotechnical Attn: State of Alaska V Attn: Makana Bender 333 W. 7th Ave, Suite 1 Anchorage, Alaska 99501 If found please return CD to: BP Exploration PO Box 196612 Anchorage, AK 99519-6612 CD1of1 hp s i 'isllWa For External Distribution BPXA OH Log Data 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, j 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09,/ 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-11, B-24, B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 18 -AUG -2014 f; Petrotechnical Data Cen- t�R2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 177-077 183-101 171-005 176-030 176-042 185-301 175-073 175-062 200-102 175-076 176-016 176-035 176-040 176-047 176-070 176-076 176-082 176-084 177-007 177-008 177-025 177-036 177-037 177-038 177-039 177-040 177-041 181-110 185-204 171-038 178-069 182-140 182-151 179-035 204-053 186-154 171-023 176-110 193-100 s ' STATE OF ALASKA OCT 1 1 2012 AllikA OIL AND GAS CONSERVATION COMMWON REPORT OF SUNDRY WELL OPERATIONS AOGCC 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time ExtensionO Change Approved Program ❑ Operat. Shutdowr0 Stimulate - Other ❑ Re -enter Suspended WeIC 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development El Exploratory ❑ 176 -070 -0 3. Address: P.O. Box 196612 Stratigraphie❑ Service 0 6. API Number: Anchorage, AK 99519 -6612 e- 50- 029 - 20230 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028324 PBU 09 -08 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 11806 feet Plugs measured 11445 feet true vertical 9096.26 feet Junk measured 11609 feet Effective Depth measured 11445 feet Packer measured 10867 feet true vertical 8838.18 feet true vertical 8412.72 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 71 20" 94# H-40 39 - 110 39 - 110 1530 520 Surface 2675 13 -3/8" 72# MN -80 38 - 2713 38 - 2712.93 5380 2670 Intermediate None None None None None None Production 11190 9 -5/8" 47# MN -80 37 - 11227 37 - 8680.85 6870 4760 Liner 11754 7" 29# MN -80 36 - 11790 36 - 9084.95 8160 7020 Perforation depth Measured depth See Attachment feet SCANNED JAN 2 8 2fl3 True Vertical depth See Attachment feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) 5 -1/2" AVA PPB Packer 10867 8412.72 Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): 11493' Treatment descriptions including volumes used and final pressure: 1 BBL CEMENT 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 3562 41544 14713 0 1608 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development ❑ Service 0 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAd 0 GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays c(bo.com Printed Name Nita Summerhays Title Petrotechnical Data Technician /0121 Signatur- F / 0 i /. , ,,„ _ i■,,,,,..._ Phone 564 -4035 Date 10/11/2012 �,� O• (Sr - .. I E OCT 15 2012si ` (0(467. Form 10-404 Revised 10/2012 Submit Original Only • • Daily Report of Well Operations ADL0028324 ACT IVITYDATE 1 SUMMARY • w c o • o •sec ive: ewe ry og or . ep con ro san • back w / cement cap MIRU / RIH w / PDS GR / CCL logging tools RIH tagged at 11673' logged up to 10800' POOH. Good data ata surface, +8' correction. RIH w/ 2.3" BDN to the flag and correct depth. 9/7/2012 «<Job continued on 9/8/2012 »> CTU #9 1.75" Coil Tubing - Job Scope = Sand back w/ Cement Cap « <Job continued from 9/7/2012 »> At 11656' elm pumped 3300 #'s of 20/40 river sand. Tag sand top at .J1553' after it settled. Pump additional 1800# 20/40 river sand, tagged sand top at 11,523' elmd. Pump additional 1000# 20/40 river sand. 9/8/2012 « <Job in Progress »> CTU #9 1.75" Coil Tubing - Job Scope = Sand back w/ Cement Cap « <Job contined from 9/8/2012 »> RIH w/ Pig Shear Nozzle, Tagged sand top at 11493' ctm. Pump 1 bbl cement cap. POOH. Freeze protect well with 58 bbls of 50/50 methanol. 9/9/2012 « <Job Complete >» FLUIDS PUMPED BBLS 51 DIESEL 66 50/50 METH 1 CEMENT 118 TOTAL FLUIDS PUMPED LBS 6100 20/40 RIVER SAND 6100 TOTAL Perforation Attachment ADL0028324 SW Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base TVD Depth Top TVD Depth Base 09 -08 6/13/2010 SQZ 11304 11307 8737.1 8739.27 09 -08 6/13/2010 APF 11307 11322 8739.27 8750.1 09 -08 6/13/2010 APF 11357 11364 8775.28 8780.3 09 -08 6/13/2010 APF 11378 11379 8790.32 8791.04 09 -08 6/13/2010 APF 11379 11395 8791.04 8802.47 09 -08 6/13/2010 APF 11395 11403 8802.47 8808.18 09 -08 6/13/2010 APF 11415 11418 8816.74 8818.89 • 09 -08 6/13/2010 APF 11418 11431 8818.89 8828.17 09 -08 6/12/2010 APF 11431 11444 8828.17 8837.46 09 -08 9/9/2012 APF 11444 11445 8837.46 8838.18 09 -08 9/9/2012 SPS 11445 11451 8838.18 8842.47 09 -08 9/9/2012 SPS 11460 11480 8848.91 8863.23 09 -08 9/9/2012 SPS 11480 11481 8863.23 8863.95 09 -08 9/9/2012 SPS 11481 11485 8863.95 8866.81 09 -08 9/9/2012 SPS 11485 11488 8866.81 8868.96 09 -08 9/9/2012 SPS 11488 11491 8868.96 8871.11 09 -08 9/9/2012 SPS 11491 11494 8871.11 8873.26 09 -08 9/9/2012 SPS 11494 11498 8873.26 8876.13 09 -08 9/9/2012 SPS 11498 11499 8876.13 8876.85 09 -08 9/9/2012 SPS 11499 11500 8876.85 8877.57 09 -08 9/9/2012 SPS 11500 11503 8877.57 8879.72 09 -08 9/9/2012 SPS 11503 11507 8879.72 8882.59 . 09 -08 9/9/2012 SPS 11507 11513 8882.59 8886.9 09 -08 9/9/2012 SPS 11513 11515 8886.9 8888.33 09 -08 9/9/2012 SPS 11515 11517 8888.33 8889.77 09 -08 9/9/2012 SPS 11517 11519 8889.77 8891.2 09 -08 9/9/2012 SPS 11519 11525 8891.2 8895.51 09 -08 9/9/2012 SPS 11525 11529 8895.51 8898.38 09 -08 9/9/2012 SPS 11529 11537 8898.38 8904.13 09 -08 9/9/2012 SPS 11537 11539 8904.13 8905.57 09 -08 9/9/2012 SPS 11539 11545 8905.57 8909.88 09 -08 9/9/2012 SPS 11545 11555 8909.88 8917.07 09 -08 9/9/2012 SPS 11555 11557 8917.07 8918.5 09 -08 9/9/2012 SPS 11564 11569 8923.54 8927.14 • Casing / Tubing Attachment ADL0028324 Casing Length Size MD TVD Burst Collapse CONDUCTOR 71 20" 94# H-40 39 - 110 39 - 110 1530 520 LINER 11754 7" 29# MN -80 36 - 11790 36 - 9084.95 8160 7020 PRODUCTION 11190 9 -5/8" 47# MN -80 37 - 11227 37 - 8680.85 6870 4760 SURFACE 2675 13 -3/8" 72# MN -80 38 - 2713 38 - 2712.93 5380 2670 TUBING 10831 5 -1/2" 17# L -80 35 - 10866 35 - 8411.98 7740 6280 TUBING 119 4 -1/2" 12.6# L -80 10866 - 10985 8411.98 - 8500.63 8430 7500 • • TREE -7: ' FMC GEN 1 • WB LFEAD= aw SA NOTES: H2S READINGS AVERAGE 125 ppm _...._.._ 09_08 A CTUATOR = AXB:S WI 4ONML WELLREQUIRESASSSVWHENON A KB. E.EV = 54' MI. BF. ELEV = KOP= 3000' Max Angle = 55° ", 5500' Datum MD = 11467' 2177' 115 -1 /2" CAM BAL -O SSSV NP D = 4.562" Datum ND 8800' SS 113 -3/8" CSG, 72#, MN-80, D = 12.347" —1 2713' Minimum ID = 3.725" @ 10973' 4 -112" PARKER SWN NIPPLE ( 10865' - 15- 1/2 " AVA SEAL ASSY,D =4.75" I ► =� I 1086T 9-5/8" X 5-1/2" AVA PPB PKR, D = 6.0" W/ 7 -5/8" MOE, D = 6.875" (5 1/2" TBG, 17 #, L -80, .0232 bpf, D = 4.892' H 10866' 1 / 10866' - I5 1/2" X 4 1/2" XO, D = 3.958" I ITOPOF 7" LNR —I 10917' ' I 10973' I 14 -1/2" PARKER SWN NP, D = 3.725" 1 4-1/2" TBG, 12.6#, L -80, .0152 bpf, D = 3.958" H 10985' 1 9-5/8" CSG, 47 #, MN-80, D = 8.681" H 11227' 10985' H4 -1/2" TUBING TAE, D = 3.833" ( 10971' H ELND TT LOGGED 05/16/92 I PERFORATION SUMMARY REF LOG: BHCS on 10/30/76 ANGLE AT TOP FEZF: 44° @ 11307' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 3-1/8" 4 11304 - 11322 S 04/06/91 3-3/8" 6 11307 - 11322 0 06/13/10 3-3/8" 6 11357 - 11364 0 06/13/10 3-3/8" 6 11378 - 11403 0 06/13/10 3-1/8" 4 11379 - 11395 S 04/06/91 3-3/8" 6 11415 - 11451 O 06/13/10 3-1/8" 4 11418 - 11444 S 04/06!91 , 11445' CTM --i TOP OF CEMENT CAP (09 /09/12) I 3-3/8" 6 11460 - 11500 S/C 10/12/96 ���1�1� %l 3.3/8" 4 11500 - 11503 S 02/06/95 VIA •' 1 11471' CTM SAND PLUG (09/09/12) I 3-3/8" 4 11503 - 11513 C 05/16/92 3.1/8" 4 11513 - 11517 S 04/06/91 3-1/8" 4 11517 - 11525 C 05/01/91 3-3/8" 6 11525 - 11545 C 10/12/96 3-1/8" 4 11545 - 11557 C 05/01/91 33/8" 4 11564 - 11569 S 04/06/91 I PBTD _j 11636' .. = 11609' H FISH - HALF SINGLE BOWSTRING (02/06/95) I 17" LNR, 29#, MN-80, .0371 bpf, D = 6.184" 11790' 4�4�4�4�N TO 11795' ••••••••A DATE REV BY C ANENTS DATE REV BY COM IVENTS PRUDHOE BAY UNIT 11/09/76 ORIGINAL COMPLETION 01/10/12 TMN/JMD ADD®H2S SAFETY NOTE WELL: 09-08 11/22/91 RWO 09/11 /12 SJIV/JAD SET SAND PLUG & CMT CAP (09/09/12 PERMIT No: '1760700 09/22/01 RWKAK CORRECTIONS 09/11/12 PJC CMT/ PERF CORRECTION API No: 50- 029 - 20230 -00 09/02/02 BHCrTP PERF CORRECTIONS SEC 2, T1ON, R15E, 1292.18 Fla., 4080.49 FNL 06/19/10 TTW /PJC PERFS (06/13/10) 02/11 /11 MB/J■D ADDED SSSV SAFETY NOTE BP Exploration (Alaska) 06/23/2011 NED FEB R `1 a°13 1`1 6 -070 Schhnnherger V OGG No. 5755 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Stephanie Pacillo 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 01 -34A BBSK -00069 PPROF WI DEFT 29- May -11 1 1 r , 09 06 BGH4 -00054 INJECTION PROFILE 25- May -11 1 1 01 -20 BINC -00032 SCMT 25- May -11 1 1 1 U -12A BD88 -00110 MEMORY PPROF WIDEFT 30- May -11 1 A -08 BBSK -00070 INJECTION PROFILE 1-Jun-11 1 1 L -122 BLPO -00103 MEMORY LEAK DETECT LOG 8-Jun-11 1 1 MPF -80 BJGT -00040 USIT 10-Jun-11 1 1 H -27A BD88 -00117 PPROF WIDEFT AND GHOST 10-Jun-11 1 1 3- 29/J -32 BP5G -00015 CROSSFLOW 27- Apr -11 1 I III W -207 BG4H -00050 INJECTION PROFILE W/ WFL 16- May -11 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services ID Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 1 900 E. Benson Blvd. Anchorage, AK 99503 -2838 RECEIVED JUN 2 7 2011 Ma C e s'= • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 18, 2011 TO: Jim Regg l � 5( ' it P.I. Supervisor �l SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 09 -08 FROM: John Crisp PRUDHOE BAY UNIT 09 -08 Petroleum Inspector Src: Inspector Reviewed By: ) P.I. Supry ,113,---- NON- CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 09 -08 API Well Number: 50- 029 - 20230 -00 -00 Inspector Name: John Crisp Insp Num: mitJCr110517114944 Permit Number: 176 -070 -0 Inspection Date: 5/13/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 09 -08 . IType Inj. I W I TVD 8413 j IA I 580 1 2500 ' 2480 1 2470 - P.T.D 1760700 'TypeTest 1sPT Test psi I 2103 OA 0 ° I ° ° Interval 4 ' TST p/F P Tubing 1300 1300 I 1300 1300 Notes: 4.4 bbls pumped for test I Wednesday, May 18, 2011 Page 1 of 1 STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISS~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ^ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re-enter Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: . Permit to Drill Number: Name: Development ^ Exploratory ^ 176-0700 3. Address: P.O. Box 196612 Stratigraphic ^ Service ^~ .API Number: Anchorage, AK 99519-6612 50-029-20230-00-00 8. Property Designation (Lease Number) : ,~ 9. Well Name and Number: ADLO-028324 ~ PBU 09-08 10. Field/Pool(s): ~ P PRUDHO E BAY FIELD / RUDHOE BAY POOL 11. Present Well Condition Summary: Total Depth measured 11806 feet Plugs (measured) None feet true vertical 9096.26 feet Junk (measured) 11609' feet Effective Depth measured 11551 feet Packer (measured) 10867 true vertical 8914 feet (true vertical) 8413 Casing Length Size MD TVD Burst Collapse Structural Conductor 71 20" SURFACE - 71 SURFACE - 71 Surface 2683 13-3/8" 72# MN-80 SURFACE - 2713 SURFACE - 2713 5380 2670 Intermediate Production 11197 9-5/8" 47# MN-80 SURFACE - 11227 SURFACE - 8659 6870 4760 Liner 873 7"29# MN-80 10917 - 11790 8464 - 9065 8160 7020 Liner Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# L-80 SURFACE - 10866 SURFACE -8413 4-1/2" 12.6# L-80 10866 - 10985 8412 - 8501 Packers and SSSV (type, measured and true vertical depth) 9-5/8"X5-1/2" AVA PKR 10867 8413 R~~ElVEI~ 12. Stimulation or cement squeeze summary: ~ ~ N ~ ~ 2 Intervals treated (measured): `fir} / .;}~ }.~ ~: «„ ~~ Alaska Obi ~ u~ ~'a1'i'a"". Commission Treatment descriptions including volumes used and final pressure: F~nG~O!'~~ 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 9974 1360 Subsequent to operation: 11660 1240 14. Attachments: '1r5. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^ Service Q Daily Report of Well Operations X .Well Status after work: Oil Gas WDSPL GSTOR ^ WAG ^~ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Pr a Title Data Management Engineer Signature Phone 564-4944 Date 6/25/2010 inn iv-•r~~r rcgvwCU iicvv~ RBDMS JUN 2 8 dpi ~ ~,~~ ~~ °uui~~i~~ai viny • 09-08 • 176-070 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth To Tvd Depth Base 09-08 10/4/76 PER 11,304. 11,322. 8,737.1 8,750.1 09-08 10/4/76 PER 11,564. 11,569. 8,923.54 8,927.14 09-08 10/4/76 PER 11,555. 11,557. 8,917.07 8,918.5 09-08 10/4/76 PER 11,515. 11,545. 8,888.33 8,909.88 09-08 10/4/76 PER 11,545. 11,555. 8,909.88 8,917.07 09-08 10/4/76 PER 11,460. 11,498. 8,848.91 8,876.13 09-08 10/4/76 PER 11,418. 11,444. 8,818.89 8,837.46 09-08 10/4/76 PER 11,379. 11,395. 8,791.04 8,802.47 09-08 10/4/76 PER 11,507. 11,515. 8,882.59 8,888.33 09-08 5/13/77 PER 11,545. 11,557. 8,909.88 8,918.5 09-08 5/13/77 PER 11,564. 11,569. 8,923.54 8,927.14 09-08 5/1487 APF 11,529. 11,539. 8,898.38 8,905.57 09-08 5/14/77 APF 11,507. 11,519. 8,882.59 8,891.2 09-08 5/15/77 APF 11,460. 11,498. 8,848.91 8,876.13 09-08 5/15/77 APF 11,379. 11,395. 8,791.04 8,802.47 09-08 5/15/77 APF 11,418. 11,444. 8,818.89 8,837.46 09-08 5/10/84 APF 11,304. 11,322. 8,737.1 8,750.1 09-08 10/30/87 SQZ 11,304. 11,569. 8,737.1 8,927.14 09-08 12/2/87 RPF 11,529. 11,539. 8,898.38 8,905.57 09-08 12/2/87 RPF 11,545. 11,557. 8,909.88 8,918.5 09-08 12/2/87 RPF 11,564. 11,569. 8,923.54 8,927.14 09-08 1/3/90 RPF 11,460. 11,498. 8,848.91 8,876.13 09-08 1/3/90 RPF 11,507. 11,519. 8,882.59 8,891.2 09-08 4/4/91 APF 11,517. 11,519. 8,889.77 8,891.2 09-08 4/4/91 APF 11,513. 11,517. 8,886.9 8,889.77 09-08 4/4/91 APF 11,564. 11,569. 8,923.54 8,927.14 09-08 4/4/91 APF 11,529. 11,537. 8,898.38 8,904.13 09-08 4/4/91 APF 11,507. 11,513. 8,882.59 8,886.9 09-08 4/4/91 APF 11,460. 11,480. .8,848.91 8,863.23 09-08 4/4/91 APF 11,480. 11,485. 8,863.23 8,866.81 09-08 4/4/91 APF 11,304. 11,322. 8,737.1 8,750.1 09-08 4/4/91 APF 11,379. 11,395. 8,791.04 8,802.47 09-08 4/4/91 APF 11,485. 11,503. 8,866.81 8,879.72 09-08 4/4/91 APF 11,418. 11,444. 8,818.89 8,837.46 09-08 4/6/91 SQZ 11,304. 11,569. 8,737.1 8,927.14 09-08 5/1/91 RPF 11,517. 11,519. 8,889.77 8,891.2 09-08 5/1/91 RPF 11,529. 11,539. 8,898.38 8,905.57 09-08 5/1/91 RPF 11,539. 11,545. 8,905.57 8,909.88 09-08 5/1/91 RPF 11,545. 11,557. 8,909.88 8,918.5 09-08 5/1/91 APF 11,519. 11,529. 8,891.2 8,898.38 09-08 5/16/92 RPF 11,507. 11,513. 8,882.59 8,886.9 09-08 5/16/92 RPF 11,494. 11,499. 8,873.26 8,876.85 09-08 5/16/92 RPF 11,481. 11,485. 8,863.95 8,866.81 09-08 5/16/92 APF 11,503. 11,507. 8,879.72 8,882.59 09-08 5/16/92 RPF 11,488. 11,491. 8,868.96 8,871.11 09-08 2/6/95 APF 11,480. 11,500. 8,863.23 8,877.57 09-08 4/29/95 RPF 11,460. 11,480. 8,848.91 8,863.23 09-08 10/12/96 RPF 11,525. 11,545. 8,895.51 8,909.88 09-08 10/12/96 RPF 11,460. 11,500. 8,848.91 8,877.57 09-08 6/12/10 APF 11,431. 11,451. 8,828.17 8,842.47 09-08 6/13/10 APF 11,378. 11,403. 8,790.32 8,808.18 09-08 6/13/1.0 APF 11,307. 11,322. 8,739.27 8,750.1 09-08 6/13/10 APF 11,357. 11,364. 8,775.28 8,780.3 09-08 6/13/10 APF 11,415. 11,431. 8,816.74 8,828.17 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE u 09-08 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 6/12/2010 '""*WELLSHUT-IN ON ARRIVAL***(E-LINE PERFORATION) ~ ~ INITIAL T/IA/OA = 0/0/0 ~ CORRELATED TO GAMMA RAY SURVEY DATED 30-APR-1991. ~ 1PFRF(~RATF 11d31'-11d51' ~-~/R" P.i Fi SPF Fn I~FC; **"CONTINUED ON 13-JUNE-2010*** 6/13/20101***WELLSHOT-IN ON ARRIVAL***(E-LINE PERFORATION) `INITIAL T/IA/OA = 0/0/0 CORRELATED TO GAMMA RAY SURVEY DATED 30-APR-1991 3 3/8" HSD POWERJET 3406 HMX 6 SPF 60 DEG PHASING API DATA: ENTRANCE HOLE:.37", PENETRATION: 36.5", EXPLOSIVES: 22.7 IG ::PERFORATE INTERVAL 11415'-11431' CONFIRMED ALL SHOTS FIRED PERFORATE INTERVAL 1135T-11364' CONFIRMED ALL SHOTS FIRED PERFORATE INTERVAL 11378'-11403' CONFIRMED ALL SHOTS FIRED PERFORATE INTERVAL 1 1 307-1 1 322' CONFIRMED ALL SHOTS FIRED +LEFT WELL SHUT-IN AND SSV OPEN. RDMO AND HAND OVER TO DSO. INITIAL T/IA/OA = 0/0/0 **"JOB COMPLETED""* FLUIDS PUMPED BBLS 6 MEOH 2 diesel 8 Total TREE = FMG GEN 1 WEL'LHEAb = CNV ACTUATOR = RXELSON KB. ELEV = 54' BF. ELEV = KOP = 3000' Max Angle = 55 @ 5500' Datum MD = 11467' Datum TV D = 8800' SS 13-3/8" CSG, 72#, MN-80, ID = 12.347" 2713 Minimum ID = 3.725" @ 10973' 4-1 /2" PARKER SWN NIPPLE 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" ~--( 10866' TOP OF 7" LNR 10917 4-112" TBG, 12.8#, L-80, .0152 bpf, ID = 3.958" 10985 9-5/8" GSG, 47#, MN-80, ID = 8.681" 11227' PERFORATION SUMMARY REF LOG: BRCS on 10/30/78 ANGLE AT TOP PERF: 44° @ 11307' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 11304 - 11322 S 04/06/91 3-318" 8 11307 - 11322 O 06/13/10 3-3/8" 6 11357 - 11364 O 08/13/10 3-3/8" 6 11378 - 11403 O 08/13/10 3-1/8" 4 11379 - 11395 S 04/08/91 3-3/8" 6 11415 - 11451 O 06/13!10 3-1/8" 4 11418 - 11444 S 04/06/91 3-318" 6 11460 - 11500 O 10/12/96 3-3/8" 4 11500 - 11503 S 02/08/95 3-3/8" 4 11503 - 11513 O 05/18/92 3-1/8" 4 11513 - 11517 S 04/06/91 3-1/8" 4 11517 - 11525 O 05/01/91 3-3/8" 6 11525 - 11545 O 10/12/98 3-1/8" 4 11545 - 11557 O 05/01191 3-3/8" 4 11564 - 11569 S 04106/91 7" LNR, 29#, MN-80, .0371 bpf, ID = 6.184" '~--{ 2177' H 5-1/2" CAM BAL-O SSSV NIP, ID = 4.562" 5-1/2" AVA SEAL ASSY, ID = 4.75" 9-5/8" X 5-1/2" AVA PPB PKR, ID = 6.0" W/ 7-5/8" MOE, ID = 6.875" 10866 - j 5 1/2" X 4 1/2" XO, ID = 3.958" 10973 4-1/2" PARKER SWN NIP, ID = 3.725" 10985' 4-112" TUBING TAIL, ID = 3.833" 10971' - rELMD TT LOGGED 05/16/92 {~- 11609' FISH -HALF SINGLE BOWSTRING DATE REV BY COMMENTS DATE REV BY COMMENTS 11/09/76 ORIGINAL COMPLETION 11/22!91 RWO 09/22/01 RN/KAK CORRECTIONS 09/02!02 BHC/TP PERF CORRECTIONS 06/19/10 TTW/PJC PERFS (06113/10) PRUDHOE BAY UNfT WELL: 09-08 PERMfT No: "1760700 API No: 50-029-20230-00 SEC 2, T10N, R15E, 1292.18 FEL, 4080.49 FNL BP Exploration (Alaska) SAFETY o~-os . . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg.?¿f ' P.I. Supervisor !Vir ¿ J /( ,1 7 ô~ -I! L- , DATE: Thursday, May 24, 2007 SCBJECT: Mechantcallntegrity Tests BP EXPLORATION (\LASKA) INC 09-08 PRUDHOE BAY UNIT 09-08 Src: Inspector \117 õÎCJ FROM: Jeff Jones Petroleum Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv JBt2- Comm Well Name: PRUDHOE BAY UNIT 09-08 Insp Num: mitJJ0705 1 9072450 ReI Insp Num: API Well Number: 50-029-20230-00-00 Permit Number: 176-070-0 Inspector Name: Jeff Jones Inspection Date: 5/18/2007 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. -¡-.- Well! 09-08 ¡Type Inj. i W TVD '-----. P.T.Di 1760700 iTypeTest i SPT Test psi ~_~__ I Interval 4YRTST P/F P 8413 IA OA Tubing! 40 2510 2500 2495 --- 2 ¡ 03.25 80 90 90 90 ,,/' ~----_.__._-~_.- -~-~-------~ 1100 1100 ¡IOO 1100 ~-,-~_._---- I 'u ---_._._-~ Notes: 5.6 BBLS methanol pumped. 1 well house inspected; no exceptions noted 5CANNED JUN 0 6 2007 Thursday, May 24, 2007 Page I of 1 RL~¿¡ v L-Ù - . j\1"'-'\~". ~1\G ~ l r¡r.(¡IQJ , ,< . I, "'Ij.-) 'I 1.. t;, è..L -': .)\vh:.f'.t-,' ¡-,V] ~ -- AUG 0 8 Z006 08/01/06 Schlurnberger ~ Oil & Gas Cons. Co~ NO. 3883 Anchorage Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth U T ~ l1-(è:; -670 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay WII J b# L D D BL CI CD e 0 og escnptlon ate o or NK-43 11211388 PROD PROFILE W/DEFT 04/02/06 1 NK-22A 10568415 PRoD PRUFILE W/OEFT 02/26/03 1 L4-12 N/A WFULDL 05/09/06 1 L2-21A 10670034 MEM PROD PROFILE 09/20/04 1 13-o6A 11217266 INJECTION PROFILE 07/12/06 1 01-17B 11209602 MEM PROD PROFILE 04/27/06 1 09-08 11296705 INJECTION PROFILE 07/21/06 1 09-19 11296704 INJECTION PROFILE 07/20/06 1 09-25 11296703 INJECTION PROFILE 07/19/06 1 04-09 11211398 INJECTION PROFILE 04/28/06 1 04-10 11211380 INJECTION PROFILE 03/23/06 1 17-21 11223104 PROD PROFILE W/DEFT 03/22/06 1 18-03B 11057071 SBHP 12/02/05 1 X-15A 11212877 US IT 07/18/06 1 J-01 B 11511430 USIT 07/24/06 1 15-12A 11221595 USIT 07/25/06 1 Z-14B 11217268 USIT 07/29/06 1 S-400 10987564 CH EDIT PDC-GR OF USIT 01/26/06 1 D-03A 11217269 USIT 07/31/06 1 05-28A 11217267 USIT 07/28/06 1 . . petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay / PBU / Drill Site 09 06/06/03 John Cubbon Chuck Scheve Well109-08 P.T.D. I1760700 Notes: Welll09-10 P.T.D.11760820 Notes: Packer Depths (ft.) I Type test I P I Test psiI 21031 Pretest Initial 15 Min. 30 Min. I TubingI 18501 i8501 18501 18501 IntervaI 4I CasingI 3001 24401 24201 24201 P/Fi P J I ~"~'n~'l ~ I~V~l ~'~'1 ~'~'1 ~u~'""l ~001 ~001 ~001 ~001 Interval Type testl P I mestpsil 20831 I Casingl 1001 24601 24501 24501 P/FI I P'T-D-11770410I Typetesll P I Testpsil 21411 I Casin~ll 3601 23001 3801 I P/FI FI Notes: LLR of 0.8 BPM at 2300 psi. ' I WellI Type Inj, P.T,D.I Notes: WellI Type Inj, P.T.D.I Notes: Test Details: Tests were 4 year MITIA's for UIC compliance. TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover O = Other (describe in notes) MIT Report Form Revised: 06/19/02 2003-0606_MIT_PBU_09-08_10_20.xls ~C~NNE[~,, ~\UG 0 zl 2003 FYI: MITIA Forms Subject: Date: From: To: CC: FYI: MITIA Forms Thu, 12 Jun 2003 22:19:39 -0500 "NSU, ADW Well Integrity Engineer" <NSUADWWelllntegfityEngineer~BP.com> "AOGCC Bob Fleckenstein (E-mail)" <Bob_Fleckenstein~admin.state.ak.us>, "AOGCC Field Inspectors (E-mail)" <AOGCC_Prudhoe_Bay~admin.state.ak.us>, "AOGCC Winton Aubert (E-mail)" <Winton_Aubert@admin.state.ak.us>, "AOGCC Jim Regg (E-mail)" <Jim_Regg@admin.state.ak.us> "Rossberg, R Steven" <RossbeRS~BP.com>, "Engel, Harry R" <EngelHR~BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWellOperationsSupervisor~BP.com> Hello all. Attached are several MIT reports for recent 4-year MIT's conducted on injectors. All passed except 09-20, currently under evaluation. Note we've had email problems recently, some of these may have already been sent. Let me know if you have any questions. <<MIT PBU 01-11 06-12-03.xls>> <<MIT PBU 13-19 06-12-03.xls>> 14-27 06-12-03.xls>> <<MIT PBU 09-08,10,20 06-06-03.xls>> Joe Anders, P.E. / John Cubbon Well Integrity Engineer, BP Exploration, (Alaska) Inc. Work: (907) 659-5102 Mobile: (907) 943-1154 Pager: (907) 659-5100, x1154 Email: NSUADWWellIntegrityEngineer®bp.com <<MIT PBU ~)MIT PBU 01-11 06-12-03.xlsI Type: Microsoft Excel Worksheet (application/vnd.ms-excel)] ! Name: MIT PBU 13-19 06-12-03.xls I ~_)MIT PBU 13-19 06-12-03.xls] Type: Microsoft Excel Worksheet (application/vnd.ms-excel)l ]Encoding" base64 ;: I ] Name: MIT PBU 14-27 06-12-03.xls ~_)MIT PBU 14-27 06-12-03.xlst Type: Microsoft Excel Worksheet (application/vnd.ms-excel) .......... lEncoding: base64 ~]i Name: MIT PBU 09-08,10,20 06-06-03.xls ~_) MIT PBU 09-08,10,20 06-06-03.xls] Type: Microsoft( app li cati oEXCeln/vn d.ms-exW°rksheetc e 1) [Encoding: base64 1 of 1 6/25/2003 3:10 PM i' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner THRU: Jim Regg P.I. Supervisor DATE: June 6, 2003 SUBJECT: Mechanical Integrity Test BPX DS 9 PBU FROM: Chuck Scheve Petroleum Inspector NON- CONFIDENTIAL WellI 9-08I P.T.D. I 176-070 Notes: P.T.D. I 176-082 Notes: P.T.D. I 177-041 Notes: WellI P.T.D.I Notes: WellI P.T.D.I Notes: Packer Depth Pretest Initial 15 Min. 30 Min. I · I I~"~ ITubingI I I I 4 I Type testI P I Testpsil 2103 I CasingI 300 I 24401 24201 24201 P/F I P I ,nj.I S I,.V.D. I~ I Tubing11700 11700 11700 I~00I lntervall 4I Typetestl P I Testpsil 2083 I CasingI 100 124601245012450I P/FI P I Type _ Typetestl P ITestpsil 2141 I Casingl 360 123001 380 I I P/F I F I Type _ I Type test Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS I NJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance VV= Test during Workover O= Other (describe in notes) Test's Details I traveled to BPXs DS9 and witnessed the routine 4 year MIT on wells 9-08, 9-10 and 9-20. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed with the wells 9-08 and 9. 10 demonstrating good mechanical integrity. Well 9-20 failed to pressure test and has an apparent casing leak. An injection rate of.8 bbl per minute was established at 2300 psi. The tubing and outer annulus pressures remained stable at 1150 psi and 10 psi throughout the test. When the pump was shut down the IA pressure fell rapidly back to 380 psi. The condition of this well was discussed with Jim Regg and it was allowed to remain on water injection pending further diagnostics. ~ M.I.T.'s performed: _3 Attachments: Number of Failures: 1 Total Time during tests: 4 hours cc: MIT report form 5/12/00 L.G. 2003-0606_M IT_ PBU_09-20_cs.xls 6/24/2003 JUL 0 9 2003 STATE OF ALASKA ALASKA (..-~-AND GAS CONSERVATION COrv~,SSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaskar Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24' W of SE cr, Sec 2, T10N, R15E, UM. At top of productive interval 980' N & 1102' W of SE cr, Sec 36, T11 N, R15E, UM. At effective depth At total depth 1178' N & 1338' W of SE cr, Sec 36, T11N, R15E, UM. 5. Type of Well Development Exploratory Stratigraphic Service X 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-8i 9. Permit number/approval number 76-7O 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 71' Sudace 2683' Production 11197' Liner 873' 11795 feet 9088 feet Plugs(measured) PBTD Tagged @ 11551' MD (10/12/96). 11551 feet 8914 feet Junk(measured) Size Cemented Measured depth True vertical depth 20" 300 Sx AS 71' 71' 13-3/8" 4300 Sx AS 2713' 2713' 9-5/8" 1000 Sx Class G 11227' 8659' 7" 10917 - 11790' 8464 - 9065' Perforation depth: measured 11460 - 11513'; 11517- 11557' true vertical 8848 - 8887'; 8889 - 8918' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, Tbg @ 10866' MD. Packers and SSSV (type and measured depth) AVA PPB Packer @ 10867' MD; 5-1/2" Camco BaI-O SSSV @ 2177' MD. 13. Stimulation or cement squeeze summary '~ ~ ~ ~ [;] . 14. Intervals treated(measured) See Attached Treatment description including volumes used and final pressure ~.~,,~ Representative Daily Average Produ~ion or Iniection Data Prior to well operation Subsequent to operation OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure .... 18223 -- 1926 .... 18243 -- 1918 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil~ Gas..__ Suspended ~ Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~lned ~-"~~ ~//I. ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 CC: JWP. SUBMIT IN DUPLICA'E~, 9-08i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 10/12/96' MIRU & PT equipment. RIH w/perforating gun & tagged PBTD at 11551' MD, then PU & shot 60' of reperforations as follows: Reperforated' 11460 - 11500' MD (Z2/1B) Ref. Log: BHCS 10/30/76. 11525 - 11545' MD (Z2/1B) Used 3-3/8" carriers & shot reperfs at 6 spf at 60 degree phasing at balanced pressures. POOH w/perfguns. Noted all shots fired. Rigged down. Returned the well to produced water injection & obtained a valid injection rate. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9471 Company: 5/23/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 2-31 ~/-- IO_.~ TBGCUTI'ERRECORD 043095 I 1 D.S. 3-06 '7 ~- ~' O M.I. INJEC LOG 0421 95 I 1 D.S. 3-31 ~ ~-~ Z.. CNL 050295 I 1 D.S. 7-32 ~/~--/~'O PERFRECORD 042895 I 1 D.S. 9-8 '~"'70 iPERFRECORD 042995 I 1 D.S. 9-12 ~") ~' '~ INJECPROFILE 050395 I 1 D.S. 11-16 ST1 ~'~-7~ PERFRECORD 042995 I 1 D.S. 11-23A C~ ~.. ~ I PERF RECORD 0501 95 I 1 D.S. 11-28 ~C~"'70 I LEAK DETECTION 042895 I 1 D.S. 11-35 C.{ c~"~p_.~ CNL 050295 I 1 D.S. 11-36Cl'~-~,~ DUAL BUST TDT-P 050195 I 1 D.S. 11-36 C~ ~- ~ ~ RET 042195 I 1 D.S. 14-5A c~.~_.. / PERFRECORD 042795 I 1 D.S. 14-22A d]~.-/~ PERFRECORD 042795 I 1 O.S. 14-28~,=,~,'- I.~_-. LEAK DETECTION 042995 I I . ,D.S. 14-33 ~'.~-/.~.~ CNL 042795 I 1 D.S. 14-43 ~-" JO~!DUALBURSTTDT-P 042795 I 1 O.S. 16-12 ~ l"" ~q==" TBG CUTTER RECORD 0430951 I 1 D.S. 18-02A C~5-~O PERFRECORD 050295 I 1 D.S. 15-19 ' 95176 DUAL BURST TDT-P 050495 I SIGNED' Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED DATE: £ 1995 Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ALAS,. OIL AND GAS CONSERVATION..__)MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24' W of SE cr, Sec. 2, T10N, R15E, UM At top of productive interval 980' N & 1102' W of SE cr, Sec. 36, T11 N, R15E, UM At effective depth At total depth 1178' N & 1338' WoI SEcr, Sec. 36, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-08i 9. Permit numbedapproval number 76-70 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11795 feet 9088 feet Plugs(measured) PBTD Tagged @ 11615' MD (4/28/95) Effective depth' measured 11615 feet true vertical 8960 feet Junk(measured) Casing Length Size Cemented Conductor 71' 20" 300 sx AS Sudace 2683' 13-3/8" 4300 sx AS Production 11197' 9-5/8" 1000 sx CL 'G' Liner 873' 7" Measured depth True vertical depth 71' 71' 2713' 2713' 11227' 8659' 10917-11790' 8464-9065' Perforation depth: measured 11460-11513'; 11517-11557' true vertical 8848-8887'; 8889-8918' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 10866' MD RECEIVED ~AY 2 ;5 1995 Ataska Oil & Gas Cons. Commission Anchora~:i~ Packers and SSSV (type and measured depth) AVA 'PPB' pkr @ 10867' MD; Camco 'BAL-O' SSSV @ 2177' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 19887 23668 Tubing Pressure 3156 3156 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil__ Gas__ Suspended m Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 cc' KZ, JWP Title Engineering Supervisor SUBMIT IN DUPLICATE 9-08i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 4/28/95: RIH & tagged PBTD at 11615' MD. 4/29/95: MIRU & PT equipment. Reperforated: 11460 - 11480' MD (Z1) Ref. Log: BHCS 10/30/76. Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing at balanced pressure. POOH w/perf gun. Noted all shots fired. Rigged down. RIH w/perforating guns & shot 20' of reperforations as follows: Returned the well to miscible gas injection & obtained a valid injection rate. RECEIVED MAY 2 3 ]995 Ataska 0il & Gas Cons. Commission Anchorc, ,,~ STATE OF ALASKA ALASK~-OIL AND GAS CONSERVATION L,~MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24' W of SE cr, Sec. 2, T10N, R15E, UM At top of productive interval 980' N & 1102' W of SE cr, Sec. 36, T11 N, R15E, UM At effective depth At total depth 1178' N & 1338' Wof SE cr, Sec. 36, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-08i 9. Permit number/approval number 76-70 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11795 feet 9088 feet Plugs(measured) PBTD Tagged @ 11604' MD (2/6/95) Effective depth: measured 11604 feet true vertical 8952 feet Junk(measured) Ca sing Length Size Cemented Conductor 71' 20" 300 sx AS Su dace 2683' 13-3/8" 4300 sx AS Production 11197' 9-5/8" 1000 sx CL 'G' Liner 873' 7" Measured depth True vertical depth 71' 71' 2713' 2713' 11227' 8659' 10917-11790' 8464-9065' Perforation depth: measured 11480-11513'; 11517-11557' true vertical 8863-8887'; 8889-8918' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 @ 10866' MD RECEIVED MAR - 7 1995 ~Jaska U~j & 8as Cons. C0mrnJssion Anchora /e Packers and SSSV (type and measured depth) AVA 'PPB' pkr @ 10867' MD; Camco 'BAL-O' SSSV @ 2177' 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 11432 16475 Tubing Pressure 2918 2916 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas__ Suspended__ Service Iniector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~1/~. ~_../q~;~...-- Title Engineering Supervisor Date Form 10-404 Rev 06/15/88 CC: KZ, JWP SUBMIT IN DUPLICATE 9-08i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 2/6/95' MIRU & PT equipment. Reperforated' RIH w/perforating guns & shot 60' of perforations as follows: 11480 - 11499' MD (Z2) 11517 - 11557' MD (Z2) Added Perforations: Ref. Log: BHCS 10/30/76. 11499 - 11500' MD (Z2) Ref. Log' BHCS 10/30/76. Used 3-3/8" carriers & shot 4 spf at 180 degree phasing at overbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to miscible gas injection & obtained a valid injection rate. RECEIVED MAR 1995 Alaska 0il & Gas Cons. Commission Anchora ~ GeoQuest 500 w. International Airport Road Anchorage, AK99518-11.9,9¢' ATTN' Sherrie ,,, CEIVED NO. 9264 Company: 2/22/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 k~¢h0ra~e Field: Prudhoe Bay Floppy Well Job # LOg Description Date BL RF Sepia Mylar Disk D.S. 1-25 ' PATCH SETTING RECORD 020495 1 I I D.S. 1-22A DUAL BURSTTDT-P 020395 I 1 D,S, 11-11 PERF RECORD 020395 1 I ,, D,S. 9-38 INJEC PROFILE 020495 I 1 ....... D,S. 9-45 DUAL BURSTTDT-P 020595 I 1 D.S. 9-45 RST 020495 1 1 D.S. 9-51 PROD PROFILE 020595 I 1 D.S. 16-4A RST 020295 I 1 , , D,S. 18-14 TUBING CUTTER RECORD 020595 I 1 ...... D.S. 5-26 PROD PROFILE 020695 1 1 ......... D,S. 5-28 PROD PROFILE 020695 I 1 D.S. 6-10 DUAL BURSTTDT-P 020795 I 1 , , D.S. 9-8 PERF RECORD 020695 1 1 D.S, 11-16 PERF RECORD 020395 1 1 D.S. 14-34 PERF RECORD 020795 1 1 SIGNED' DATE' Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9167 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 12/29/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar Floppy Disk .P } 12-34 /~ [ [ ! '2 7 USlT (12-8-94) I 1 ~ , 12-34 -I -/-- I_J CBT (12-8-94) I 1 D.S. 2-7 ~L~.~I~,~.,,,- PROD LOG/PLUG CHECK (12-9-94) I 1 D.S. 5-11 ~ ~~ DUAL BURST TDT-P (12-2-94) I 1 D.S. 9-8 ~ ~ - ~ INJEC PROFILE (12-5-94) I 1 D.S. 11-36 ~ ~- O~ ~ SE~ING RECORD (12-1-94) I 1 D.S. 14-4 ~ ~ ~ ~ STATIC PRESS SURVEY (12-3-94) I 1 D.S. 14-4 / ~ ~~ PROD LOG (12-6-94) I 1 D.S. 17-19 ~ I~ O~ STATIC PRESS SURVEY/JEWELRY LOG (12-10-94) I 1 o.s. ~s-20 ~/~) 9UAL ~URST TOT-P (~-9-~4) I ~ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 6-19-92 REFERENCE: ARCO CASED HOLE FINALS /%-{/~ 1-5ST 5-31-92 Prod Profile ?;-~/ 7-1 5-29-92 Inj Profile ~- ?~ 9-8 6-1-92 Inj Profile ~--~g 9-27 6-1-92 Prod Profile 12-1 ?~3 5-29-92 Prod Profile ??- ~t/ 12-6 5-28-92 Leak Detect ~/-/?~c- 12-7A 5-29-92 Prod Profile J3-/~ 12-25 5-29-92 Inj Profile ?,~-~-~ 13-4 5-30-92 Prod Profile ~3--~>- 14-25 5-30-92 Inj Profile ~--/~// 18-20 5-26-92 Prod Profile Rim Run Run Run Run .Run Run Run Run Run Run It 5t! 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" ~lmco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Please sign and return the RECEIVED BY Have A Nice Day! ~ ~ C ~[V E D attached copy as receipt of data. SonyaW-11s, ce JUN 2 9 1992 ATO-1529 Alaska Oil & Gas Cons. Commission Anchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL APPROVED Trans# 92123 # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ~KA TEXACO STATE OF ALASKA ~ ALASKA . AND GAS CONSERVATION CC !ISSIONI"~ ~ ~ 6 ~ ~ REPORT LTF SUNDRY WELL OPF_..-r ATIOI S 1. Operations performed: Operation shutdown Stimulate Plugging Perforate , X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24' W of SE cr, Sec. 2, T10N, R15E, UM At top of productive interval 980' N & 1102' Wof SEcr, Sec. 36, T11N, R15E, UM At effective depth At total depth 1178' N & 1338' Wof SE cr, Sec. 36, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-08 9. Permit number/approval number 76-70 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11795' feet 9088' feet Plugs(measured) Effective depth: measured 11701' feet true vertical 9021' feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 71' 20" 300 sx AS 71' Sudace 2683' 13-3/8" 4300 sx AS 2713' Intermediate 11197' 9-5/8" 1000 sx CL 'G' 11227' Liner 873' 7" 10917'-11790' True vertical depth 71' 2713' 8659' 8464'-9065' Perforation depth: measured 11481-11485';11488-11491';11494-11499';11503-11513';11515-11555' true vertical 8864-8866';8869-8871 ';8873-8877';8880-8887';8888-8917' Tubing (size, grade, and measured depth) 5-1/2",17#,L-80 @ 10975' MD Packers and SSSV (type and measured depth) AVA 'PPB' pkr @ 10857' MD;Camco 'BAL-O' SSSV @ 2177' 13. Stimulation or cement squeeze summary P~EEEiV~D 14. Intervals treated(measured) J U N 2 5 1992 Treatment description including volumes used and final pressure Alaska Oil & 6as Cons. 60mmissi0~ Representative Daily Average Production or Injection Data Anchorage OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 8493 950 1870 Subsequent to operation - 9399 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations x Oil Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~' ~ Title Form 10-404 Rev 06/15/88 1200 1949 Service Injector FS-2 Regional Operations Engineer Date / SUBMIT I~ DUPLICATE ~' . .ILY REPORT OF WELL OPER, ..... .ONS DS 9-08 Perforating Operations' ARCO Alaska, Inc. perforated DS 9-08 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 5/16/92. The intervals perforated were the following: 11481'-11485'; 11488'-11491'; 11494'- 11499'; 11509'-11511~' MD (Reference Log: SWS-BHCS dated 10/30/76). Injection fluid was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 5/16/92. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. S.I. well, RIH and perforated 11503'-11513' MD at 4 SPF, POOH, and confirmed all shots fired. RIH and perforated 11481'-11485', 11488'-11491' & 11494-11499' MD at 1 SPF, POOH, and confirmed all shots fired. (ref: SWS-BHCS dated 10/30/76). Rigged down and secured well. RECEIVED JUN 2 5 !99~ Alaska 0il & Gas Cons, Anchorage RDC' 6/4/92 ARCO Alas~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-29-92 REFERENCE: ~1' 6-14~// 5-19-92 '1,~/;~I'~/'"'~¢' 9-8 / 5-16-92 14-15 ~ 5-17-92 '~l-)° 15-3 //5-24-92 ~/~lZ~ 15-24 5-23-92 16-27 5-13-92 ~Z~~ 16-27 5-13-92 ARCO CASED HOLE FINALS Tubing Cutter PFC/GR Run 1, 5" Run 1, 5" CCL (BP Correlation) Run 1, 5" Tubing Cutter R~m 1, 5" Prod/Temp/Pres/Spin Trap Run 1, 5" CBT Run 1, 5" CET Run 1, 5" Sch Atlas Aths Sch Sch Sch Sch Please sign and return ~ attache~~s~ipt of data. R£CI IVED RECEIVED BY___~ JUN~ 8 1992 Have A Nice Day! Sonya Wallace A~_PPROVED ATO-1529 -zrans# 9211~-~ # CENTRAL FILES # CHEVRON D&M - # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL F~ R&D # BPX # STATE OF ALASKA TEXACO ALA;:~-,~A OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate~ Pull tubing X Alter casing Repair well Other X WORKOVER 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1816'N SL, 24'WEL, SEC. 02, TION, R15E At top of productive interval 980'NSL, 1102' WEL, SEC. 36, T11N, R15E At effective depth At total depth 1178'NSL, 1338'WEL, SEC. 36, T11N, R15E 5. Type of Well: Development. Exploratory Stratigraphic Service X 6. Datum elevation (DF or KB) KBE -- 54' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 9-8 (33-36-11-15) 9. Permit number/approval number 76-70 / 91-323 10. APl number 50- 029-20230 11. Field/Pool Prudhoe Bay Field~Oil Pool 12. Present well condition summary Total depth: measured true vertical 11795'MD feet Plugs (measured) 9088'TVD feet BKB Effective depth: measured true vertical 11701MD feet Junk (measured) 9021TVD' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth 71' 20" 300 sx AS 71' 71' 2683' 13-3/8" 4300 sx AS 2713' 2713' 11197' 9-5/8" 1000 sx Cl G 11227' 8659' measured 873' 7" 10917'- 11790' 8464'-9065' 11304'-11322'. 11379'-11395', 11418'-11444', 11460'-11498', 11507'- 11519', 11529'-11539', 11545'-11557', 11564'-11569' true vertical 8737'-8927' (all intervals) Tubing (size, grade, and measured depth) 5-1/2" 17#L-80 @ 10975' 13. Stimulation or cement squeeze summary None Intervals treated (measured) Treatment description including volumes used and final pressure 14. Packers and SSSV (type and measured depth) A VA "PPB" Packer @ 10857' (DPM); Camco "Bal-O" SSSV @ 2177' RECEI u FEB 18 t992 Alaska Oil & Gas Cons. Commission I ii~11~;I, g Representative Daily Average Production or In!ection~'~a u OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed /~ ~)3 ~ TitleWorkoverEn~lineer Form 10-40~t Rev 06/15/88 Date ~) / ~/E,,3..- SUBMIT IN DUPLICATE ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY 9-08I AUDI 4 KILL: 5.0 NDNU: 8.0 11/10/91 ( 1) TEST BOPE. MW: 8.5 Seawater TD:11795 MOVE RIG TO DS 9-18I. RIG ACCEPTED @ 17:00 HRS, 11/9/91. PB:11478 R/U LINES. R/U LUB. TEST LUB. CIRC WELL W/ SEAWATER. N/D SUPV:LM TREE. N/U BOPE. TEST BOPE. DAILY:S31,248 CUM:$31,248 ETD:S31,248 EFC:$883,000 NDNU: 5.5 PTBG: 18.5 11/11/91 ( 2) L/D TBG. MW: 8.5 Seawater TD:11795 N/U BOPE. TEST BOPE. PULL TBG HGR. L/D SAME. POOH. L/D PB:11478 5-1/2" TBG. SUPV:LM DAILY:S28,939 CUM:$60,187 ETD:S60,187 EFC:$883,000 PTBG: 24.0 11/12/91 ( 3) TD:11795 PB:11478 SUPV:LM L/D FTA. MW: 8.5 Seawater POOH, L/D TBG. TEST BOPE. RIH W/ BHA #2. MILL OVER TOP OF TBG @ 10639'. LATCH ON W/ OVERSHOT. POOH W/ FISH. L/D SAME. DAILY: $28,053 CUM: $88,240 ETD: $88,240 EFC: $883,000 PPBR: 13.0 PROB: 11.0 PROB CODE: EFS 11/13/91 ( 4) POOH W/ PBR SPEAR. MW: 8.5 Seawater TD:11795 RIH W/ SPEAR. TAG TOF @ 10679'. FISH FOR K-ANCHOR. APPEAR PB:11478 PULL K-ANCHOR FREE. POOH. SPEAR BODY FAILED. RIH W/ NEW SUPV:SW SPEAR. TAG TOF @ 10677' ENGAGE FISH. POOH SLOWLY W/ PBR SPEAR. DAILY:S28,876 CUM:$117,116 ETD:S117,116 EFC:$883,000 PPBR: 22.5 PROB: 1.5 PROB CODE: EFS 11'/14/91 ( 5) RIH W/ SPEAR FOR PBR. MW: 8.5 Seawater TD:11795 POOH W/ BHA #4. NO PBR. RIH W/ WASHPIPE. TAG TOF @ PB:11478 10677' WORK OVER PBR. CLEAN OUT TOP OF K-ANCHOR, MILL SUPV:SW OUTSID~ OF SAME, 6" PKR. TOP OF PKR @ 10721'. CBU. POOH. L/D WASHPIPE. RIH W/ TSA SPEAR. DAILY:S26,876 CUM:$143,992 ETD:S143,992 EFC:$883,000 PPBR: 7.5 PPKR: 14.0 WCON: 2.5 11/15/91 ( 6) POOH W/ PKR ASS'Y. MW: 8.5 Seawater TD:11795 RIH W/ BHA #6. TAG TOF @ 10677'. ENGAGE FISH W/ SPEAR. PB:11478 ATTEMPT BACKOFF. NO GO. JAR. JAR FREE. POOH W/ FISH. L/D SUPV:SW BHA, FISH (K-ANCHOR, PBR). RIH W/ FTA #7. TAG TOF @ 11720'. ENGAGE FISH. MILL ON PKR F/ 10720'-10722'. CIRC XCD PILL. MILL ON PKR F/ 10722'-10725' PKR FELL FREE. CBU. CIRC OUT GAS. POOH W/ PKR. DAILY:S28,776 CUM:$172,768 ETD:S172,768 EFC:$883,000 R[CEIV[D FEB 1 992 Alaska Oil & Gas Cons. [;ornmissio~ Anchorage ACTIVITY SUMMARY BP/AAI SHARED SERVICE PRUDHOE BAY NORTH SLOPE 9-08I AK AUDI 4 PPKR: 3.5 FISH: 20.5 11/16/91 ( 7) CIRC XCD SWEEP. MW: 8.5 Seawater TD:11795 POOH. L/D PKR & TAIL ASS'Y. RIH W/ FTA #8. TAG TOL @ PB:11478 10910'. TAG FILL @ 11475'. CLEAN OUT F/ 11475'-11486'. SUPV:SW POOH. RIH W/ BHA #9. TAG FILL @ 11478'. CLEAN OUT FILL TO 11582'_ CIRC 50 BBLS XCD PILL. DAILY:S36,608 CUM:$209,376 ETD:S209,376 EFC:$883,000 COUT: 13.5 FISH: 10.5 11/17/91 ( 8) CHECK FOR FILL. MW: 8.5 Seawater TD:11795 CIRC HIGH VIS XCD SWEEP. ATTEMPT TO POOH. JUNK CAUSE PB:11478 EXCESSIVE DRAG. RIH. REV CIRC. POOH. RECOVER 25.73' SUPV:SW LOGGING TOOL (FISH). RIH W/ BHA #10. TAG FILL @ 11581'. CLEAN OUT F/ 11581'-11625'. REV CIRC. POOH. DAILY:S88,931 CUM:$298,307 ETD:S298,307 EFC:$883,000 COUT: 11.0 TCSG: 13.0 11/18/91 ( 9) RIH W/ BHA #12. MW: 8.5 Seawater TD:11795 RIH. TAG 1' FILL. DISP WELL W/ SEAWATER. POOH. RIH W/ PB:11478 BAKER RETRIEV-A- MATIC TO 11278'. SET PKR. TEST CSG TO SUPV:SW 3500 PSI. POOH W/ PKR. L/D PKR. RIH W/ BHA #12. DAILY:S27,140 CUM:$325,447 ETD:S325,447 EFC:$883,000 11/19/91 (10) TD:11795 ?B:11478 SUPV:SW COUT: 12.5 RPKR: 11.5 POOH W/ PKR SET TOOL. MW: 8.5 Seawater RIH W/ BHA #12. TAG FILL @ 11623'. DRLG FILL F/ 11623'-11701'. REV CIRC. POOH. L/D DC. P/U 4-1/2" TAIL ASS'Y, AVA 'PPB' PKR. RIH. SET PKR @ 10857'. DROP BALL. PRESS UP TO 3450 PSI. PRESS UP ON ANNULUS. RELEASE F/ PKR. POOH. DAILY:S45,070 CUM:$370,517 ETD:S370,517 EFC:$883,000 RPKR: 19.5 RCMP: 4.0 PROB: 0.5 PROB cODE: EFC 11/20/91 (11) RIH W/ 5-1/2" TBG. MW: 8.5 Seawater TD:11795 ATTEMPT TO RELEASE F/ PKR. PUMP DN DP. PUMP DN ANNULUS. PB:11478 JAR. SETTING TOOL FREE. POOH. M/U DUMMY SEAL ASS'Y. RIH. SUPV:FH TAG TOP PKR @ 10857'. ENGAGE PKR. TEST PKR, CSG & PKR TO 3500 PSI. OK. POOH. TEST BOPE. M/U AVA SEAL ASS'Y. RIH W/ 5-1/2" TBG. DAILY:S25,305 CUM:$395,822 ETD:S395,822 EFC:$883,000 NDNU: 2.0 RCMP: 20.0 PROB: 2.0 PROB CODE: EFS 11/21/91 (12) N/D BOPE. MW: 8.5 Seawater TD:11795 RIH W/ 5-1/2" TBG. R/U CAMCO. M/U CNTRL LINES. RIH W/ PB:11478 TBG. TAG PKR. SPACE OUT TBG. M/U TBG HGR, LAND JT. HOOK SUPV:FH UP CNTRL LINES TO HGR. TEST LINES. DISP W/ 130 BBLS DIESEL DN TBG. ATTEMPT TO LAND TBG. NO GO. POOH W/ HGR. REALIGN TBG HGR. LAND TBG. TEST TBG HGR. TEST TBG, ANNULUS. OK. L/D IJkND JT. SET BPV. N/D BOPE. DAILY:S326,412 CUM:$722,234 ETD:S722,234 EFC:$883,000 RECEIVED FEB 1 8 t]92 Alas. Oil .a Gas Cons. Comm'tsslO Anchorage ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE PRUDHOE BAY 9-08I AUDI 4 NDNU: 3.0 11/22/91 (13) TD:11795 PB:11478 SUPV:FH RIG RELEASED @ 09:00 HRS. MW: 8.5 Seawater N/U TREE. TEST TREE. SECURE WELL. RIG RELEASED @ 09:00 HRS, 11/21/91. DAILY:S58,420 CUM:$780,654 ETD:S883,000 EFC:$780,654 AK RECEIVED Alaska Oil & Gas Cons. CommissioD Anchorage STATE OF ALASKA ALASKA _ AND GAS CONSERVATION CC~_~/IISSIOI~ ~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816'N & 24'Wof SE cr, Sec 2, T10N, R15E, UM At top of productive interval 980' N & 1102' Wof SE cr, Sec 36, T11N, R15E, UM At effective depth At total depth 1178' N & 1338' Wof SEcr, Sec 36, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-8i 9. Permit number/approval number 76-70 / 91-098 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11795 feet Plugs(measured) 9088 feet Effective depth: measured 11636 feet true vertical 8975 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 71' 20" 300 Sx AS 71' 71' Surface 2659' 13-3/8" 4300 Sx AS 2713' 2713' Production 11173' 9-5/8" 1000 Sx 'G' 11227' 8659' Liner 873' 7" 11790' 9065' Perforation depth: measured 11515-11519'; 11519-11529'; 11529-11539'; 11539-11545'; 11545-11555' true vertical 8888-8891 '; 8891-8898'; 8898-8905'; 8905-8909'; 8909-8917' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, Tbg @ 10866' MD Packers and SSSV (type and measured depth) AVA 'PPB' Packer @ 10867' MD; 5-1/2", Camco BaI-O @ 2177' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure 14. I%EL. EIV E~ JAN - 6 3992 /~las~ 0il & Gas Cons, C0mmissio~ Representative Daily Average Production or Injection Data ~rl[;llO[UU~ Prior to well operation OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure - 2250 -- 1885 Subsequent to operation - 5000 -- 2100 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil__ Gas __ Suspended __ Service Wt~c~ Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DCR/RAC cc:SW, JWP. --. 9-8i .... - DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE & FRACTURE TREATMENT 4/6/91: MIRU CTU & Stimulation Equipment. PT equipment & RIH w/CT & washed perforations at: 11460 - 11498' MD (Z2/1B) 11507 - 11519' MD (Z1B) 11529 - 11539' MD (Z1B) 11545 - 11557' MD (Z1A) 11564 - 11569' MD (Z1A) Ref. Log: BHCS 10/30/76. Pumped 95 bbls 15% HCI w/10% Xylene, followed by 50 bbls Seawater displacement. RU cementing equipment & loaded wellbore w/seawater. Immediately proceeded with the CTU Cement Squeeze, pumping 50 bbls of acid resistive cement w/20# per bbl of aggregate, followed by 55 bbls of acid resistive cement w/out aggregate, squeezing the perforations (listed above). Placed 20 bbls of cement behind pipe at 3500 psi max squeeze pressure held for 1 hour. Contaminated cement & jetted contaminated cement from wellbore. POOH. Rigged down. 4/27/91: Performed a wellbore fill cleanout down to 11594' MD. 5/1/91: Reperforated: 11515 - 11519' MD (Z1B) Ref. Log: BHCS 10/30/76. 11529 - 11539' MD (Z1B) 11545 - 11555' MD (Z1B) Added perforations: 11519 - 11529' MD (Z1B) 11539 - 11545' MD (Z1B) Ref. Log: BHCS 10/30/76. 5/31/91: MIRU & PT equipment to 5400 psi. Ran Temperature logs, then performed a Non-Reactive Perforation Breakdown Treatment. Pumped 500 bbls of 80 degree Seawater at stepped rates of 0.5 - 13.5 bpm. Shutdown. ISIP @ 1396. Ran Temperature logs. Rigged down. 6/5/91: MIRU & PT equipment to 7600 psi. Ran Temperature logs, then performed a Non-Reactive Perforation Breakdown Treatment. Pumped 800 bbls of 70 degree Seawater w/surfactant & scale inhibitor, at 15 to 25 bpm. Shutdown. ISIP @ 1565. Ran Spinner/Temperature logs, indicating no squeezed perfs were leaking. Rigged down. 6/6/91: MIRU & PT equipment to 9500 psi. Pumped a Propped Fracture Treatment through perforations (listed above), using 12/18 mesh proppant. Pumped 250 bbls Linear Pre-Pad Gel, @ 30 bpm, followed by Shutdown. ISIP @ 1700. Resumed pumping 200 bbls Crosslinked Pad, @ 30 bpm, followed by 175 bbls Cross Linked Slurry, @ 1 - 5 ppg, followed by 208 bbls Gelled Flush, followed by Shutdown. Placed a total of 7,500 lbs of proppant into the formation. Rigged down. P ECEIVED 6/10/91 - 9/28/91: JAN - 6 3992 Performed proppant fill cleanouts. Alaska 0il & Gas Cons. ~0mrnissio~ 1 1 / 9 / 91 - 1 1 / 2 2 / 91: Anchorage Performed a Rig Workover (details reported under a separate Report Sundry, per Approval # 91-323). Returned well to injection & obtained a valid injection rate. ANCHORAGE, ALA~KA DATE ARCO CASED HOLE FINAL~ COLLAR-PERF RUN t , GR-CCL RUN CNL-GR RUN COLLAR (F'ERF) RUN i , COLLAR (PACKER) RUN t, COLLAR RUN i, VEF:TI L.O(~ RUN COLLAR RUN t , VERTILOG RUN VERTILO6 RUN '' ' ._.OF'~' A..? RECE'IF'T CIF DATA,. N AND RETURN THE AT]"ACHED r .... i 2' 5' 5" 5' 5" 5' 5" 5" ATLAS ATLA£ ATLAS A'rI_AS ATLA£' A'I'I_A;? A T 1... A.~i: ATi_A.~ A'i-LA~~ A'I'I_A~~ RECEIVED BY HAV'E A NICE DA'f'! 3'ON YA WALLACE A T 0 - i~,~ ~' '-' ~P APPROVED 'FRAN3'~ ? DISTRIBUTION CENTRAL FILE~ CHEVRON D & M EXTENSION EXF'LORATION EXXON MARATHON MOBIL PHILLIPS PB WELL FILE£ R& D BF'X STATE OF ALASKA TEXACO STATE OF ALASKA ALA~-r~A OIL AND GAS CONSERVATION COMMISSib"N APPLICATION FOR SUNDRY APPROVAL§ t 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing ~ Repair well~ Plugging __ Time extension __ Stimulate ~ Change approved program __ Pull tubing x Variance ~ Perfo rate Other 2. Name of Operator 5. Type of Well: 6. ARCO Alaska, Inc. Development__ Exploratory __ 3. Address Stratigraphic 7. P. O. Box 196612, Anchorage, Alaska 99519-6612 Service X 4. Location of well at surface 8. Datum elevation (DF or KB) KBE -- 54' feet Unit or Property name Prudhoe Bay Unit Well number 1816'N SL, 24'WEL, SEC. 02, TION, R15E At top of productive interval 980'NSL, 1102' WEL, SEC. 36, T11N, R15E At effective depth At total depth 1178'NSL, 1338'WEL, SEC. 36, T11N, R15E 12. Present well condition summary Total depth: measured true vertical 11795'MD feet Plugs (measured) 9088'TVD feet BKB DS 9-8 (33-36-11-15) 9. Permit number 76-70 10. APl number 50- 029-20230 11. Field/Pool Prudhoe Bay Field~Oil Pool Effective depth: measured true vertical 11636'MD feet Junk (measured) 8975'TVD' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 51' 20" 300 sx 71' 2683' 13-3/8" 4300 sx 2713' 11197' 9-5/8" 1000 sx 11227' true vertical 8737'-8927' (all intervals) True vertical depth 873' 7" 10917'-11790' measured 11304'-11322'. 11379'-11395', 11418'-11444', 11460'-11498', 11507'-11519', 11529'-11539', RECEIVED Tubing (size, grade, and measured depth) 5-1/2" to 10883' Packers and SSSV (type and measured depth) 9-5~8"packer@ 10744', SSSV@ 2212' O CT 2 5 Alaska Oil & Gas Cons. Comm'~ssi, o~ Anchorage 13. Attachments Description summary of proposal _Z__ Detailed operations program BOP sketch 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Service Water Injector Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~ ~'- ~ TitleWorkoverEngineer FOR COMMISSION USE ONLY D ate /g)/2'..C/¢ / Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test_~ Subsequent form required 10- [ . Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED LO,";,';:,? ,r. I Approval No. · ~'~,ppF'oved Copy . Retu reed Commissioner Date /0. 30'~i SUBMIT IN TRIPLICATE PRUDHOE BAY DS §-81 PROPOSED WORKOVER PROCEDURE SUMMARY ,RIG, OP, ERATIONS SUMMARY , . , , , 10. 11. 12. 13. 14. 15. 16. 17. MIRU. Pull BPV. Kill well with seawater. ND tree and adapter flange. NU and test BOPE and test to 5000 psi. Pull completion assembly. Test 9-5/8" Packoff in FMC Gen I mandrel hanger and test to 5000 psi. Mill and recover 9-5/8" packer and tailpipe assembly. Circulate. Fish e-line tool with overshot. Cleanout to PBTD at 11,500' MD. Reverse circulate. Short trip to TOL to verify fill removal. POOH. RIH w/ 7" casing scraper (w/ 9-5/8" scraper spaced to TOL) to top of perfs. CBU, POOH. RIH with 7" RBP to top perfs. Test 9-5/8 x 7 casing to 3500 psi.. Reverse circulate hole clean and change over to filtered inhibited seawater. POOH. RIH with 9-5/8 x 4-1/2 permanent packer & 4-1/2 tail assy. Set on DP. POOH & LDDP. RIH w/ 5-1/2 IPC completion assembly. Space out tubing. Freeze protect wellbore. Land tubing. Test tubing/casing to 3500 psi. ND BOPE and NU new 5-1/2" adapter flange and tree. Set BPV, secure well. Release rig. Estimated Rig Days' 10,0 BHP' 3550 psi @ 8800' or 7.76 ppg. Workover fluid' seawater @ 8.5 PPg. G. T. Goodrich Drilling Engineer 10/23/91 RECEIVED 0 O T 2. ,5 199~, Alaska Oil & 6as Cons. Comm'tss'~o~ Anchorage BOP STACK CONFIGURATION ATTACHMENT II 13 5/8", 5000 PS1 WP TRIPLE RAM STACK WORKO VER RISER ANNULAR PREVENTER 2" KILL LINE MANUAL HYDRAULIC GATE GATE I ! PIPE RAMS I PI PE RAMS I DRILLING SPOOL i i BLIND RAMS ! 4" CHOKE LINE HYDRAULIC MANUAL ~t ~ATE 6ATE Gas Cons, Anchora~// D ARCO ALASKA, INC. P.O. BOX 100360 ANCHORAGE, ALASKA 995. .~DATE' 8-2-9i REFERENCE' ARCO CASED HOLE FINALS 2-3. 5-22-9t 3-2- 4 .~.-9t 3-2 - 5-26-9t S-22 · 7-i 3-9i 3-27- S-I 5-9i 3-27' 7-i 3-9i 7-4' 6-22-9i 7-23- S-30-9i 7-28- 5-25-9i 9-4- 5-i 6-9i 9-8- 5-i -9i 9-2~' 5-t 7-9t 9-46 5-17-9t ** t t-25- 7-t 4-9t *** t 6-9A . 6-3-91 F'ERF RECORD F'ERF RECORD CCL F'ERF RECORD F'DK-t O0/GR/CCL F'ERF RECORD F'DK-t O0/GR/CCL CNL COLLAR LOG F'ERF RECORD COLLAR LOG TUBING PAI'CH PERF RECORD PERF RECORD F'DK -- t O0/GR/CCL-BORAX CCL-PERF RECORD JEWELRY-COMPLETION RECORD PERF-JEWELRY RECORD CNL PERF RECORD RUN i, 5" RUN t, 5' RUN i, 5' RUN t, 5' RUN t, 5' RUN t, 5' RUN i, 5' RUN i, 5' RUN i, 5' RUN t, 5' RUN i, 5' RUN i, 5' RUN t, S' RUN i, RUN i, 5" RUN RUN t, 5' RUN RUN i, 5' RUN F'LE:ASF SIGN ANI) RETURN THE ATTACHED COPY AS RECEIPT OF' DATA. RECEIVED BY ~ HAVE A NICE DAY! SONYA WALLACE AT0-t529 HLS HLS HLS HLS ATLAS HLS ATLAS SCH HLS HLS HLS HLS HLS HLS ATLAS ATLAS HLS I-ILS SCH HLS DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL ~' PHILLIPS F'B WELL FILES R & D ~ BF'X 'Il' $1'ATE OF ALASKA TEXACO * THE CORRECI'ED LOG INTERVAL FOR 9-46 IS i4408'-t5t60', ** THE CORI;:ECTED AF'I~ FOR tt-25 IS 50-029-20488-0i. ***- THE CORRECTED AF'I$ FOR t6-9A IS 50-029-20558-0t ~ ARCO ALASKA, INC. P.O. BOX t00360 ANCHORAGE, ALA£KA 995 DATE: 7-t 2-91 REFERENCE' ARCO CASED HOLE FINALS t-t t 6-5-9t t-I t 6-5-9t t -2t 6-7-9t 2-4 6-30-9I 4-i 6-t t q/..67 (4-36 6-i 9-9i \. ~-36 6-2i -9i /- 4-37 6-2t -9t ~,./_'"J' I 4-37 6-2t-9t -iIJ~'_ .~4 - 37 6-24-9t l--I,J j.. -33 7-2-9.t -33 7-2-9t ~/-~:~ 5-35 6-30-9t ?-~5 6-30-9~ * 9-6 6-~6-9t 9-8 6-5-9~ 9-9 6-23-9~ ** 9-t0 4-~ ?-9~ 9-~8 6-t3-9~ 9-33 6-~ 4-9~ *~ ~-3 4-J7-~ ~ ~ -5 6-~ 2-9~ t 2-t 2 6-t 6-9t t3-t5 6-t 7-9t **** i 3-i 6 6-i 7-9i t6-t6 6-i 3-9i i 7-i 6-t 6-9t i 7-t t 5-8-9i PROD F'ROFIL~" RUN t, 5" CAMCO GR-COLLAR J RUN t, 5" CAMCO PROD PROFILEf RUN t, 5' CAMCO CCL-PERF/ RUN i, 5' ATLAS GAS LIFT/ RUN t, 5' CAMCO CBT/ RUN t, 5' $CH CET~- RUN t, 5' $CH F'FC-GR (PACKER SETTINGY RUN t, 5" ATLAS CBTj RUN t, 2'&5' $CH CET~ RUN t, 2'&5' SCH F'FC-GR (PACKER SETTING)-~ RUN t, 5' ATLAS GR-CCL-'- RUN t, 5' ATLAS COLLAR-PERFj RUN i, 5' Al'LAS PRODUCTION PACKER-- RUN t, 5' ATLAS SBL/GR/CCL- RUN t, 5' ATLAS CCL-PERF--- RUN t, 5' ATLA£ LEAK DETECTION--' RUN t, 2'&5' CAMCO PERFORATION BREAKDOWN/ RUN t, 5" CAMCO COLLAR-PERF~ RUN ~, ~' ATLAS INJ PROFILE~ RUN t, 5' CAMCO JEWELRY-~ RUN t, 5' CAMCO LEAK DETECTION-~ RUN t, 2' CAMCO INJ PROFILE~ RUN ~, 5' CAMCO DATA FRAC TEMF'~- RUN t, 5' CAMCO LEAK DETECTION'-- RUN t, 5' CAMCO PROD PROFILE--'. RUN t, 5" CAMCO F'DK-t88/GR/CCL-BORAX~ RUN t, ~' ATLA£ LEAK DETECTION~ RUN t~ 2'&5' CAMCO INJ F'ROFILE--- RUN t, 5' CAMCO INJ F'ROFILE~ RUN t, 5' CAMCO INJECTION/PRODUCTION-- RUN t, ~' CAMCO PRISM-- RUN t, 5' ATLAS LEAK DETECTION_. RUN t, 2'&5' CAMCO PLEASE SIGN RECEIVED BY HAVE A'NICE £ONYA WALLACE AT0-t529 AND RETURN THE ATTACHED COPY.AS RECEIPT OF DATA DAY! DISTRIBUTION CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL STATE OF ALASKA TEXACO CORRECTED LOG INTERVAL FOR 9-6 IS 6700-7700 REFERENCE MiX UF' ON TRANSMITTAL 9tt59 - POSSIBLE DUPLICATE LOGS CORRECTED LOGGED INTERVAL FOR 9-40 IS t395t-~425~ CORRECTED AF'I~ FOR t3-i6 IS 50-029-20823 STATE OF ALASKA ALASKA ~_AND GAS CONSERVATION C( VllSSlON REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24'W of SE cr, Sec. 2, T10N, R15E, UM At top of productive interval 980' N & 1102' W of SE cr, Sec. 36, T11 N, R15E, UM At effective depth At total depth 1178' N & 1338' W of SE cr, Sec. 36, T11 N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service Other 6. Datum of elevation(DF or KB) 54 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-08 9. Permit number/approval number 76-70/9-988 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11795 feet Plugs(measured) true vertical 9088 feet Effective depth: measured 11636 feet true vertical 8975 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 71' 20" 300 sx AS 71' 71' Sudace 2659' 13-3/8" 4300 sx AS 2713' 2713' Production 11173' 9-5/8" 1000 sx 'G' 11227' 8659' Liner 873' 7" -- 11790' 9065' Perforation depth: measured 11460-11498'; 11507-11519'; 11529-11539'; 11545-11557'; 11564-11569' true vertical 8849-8876'; 8883-8891'; 8898-8906'; 8910-8918'; 8923-8927' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT @ 10755' MD; 4-1/2", 12.6#, MN-80, NPCT tail @ 10881' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10744' MD; 5-1/2" Otis RQY SSSV @ 2212' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation OiI-Bbl Gas-Md Water-Bbl Casing 7000 8700 Jbing Pressure 1300 1300 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil...._ Gas..__ Suspended_.... Service X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. S ig n e d ~/~.~._/1'7~ ~j~ · ~j~,~.~ Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUN/nb Date SUBMIT IN DUPLICATE DS 9-08i PERFORATING SUMMARY OF OPERATIONS ARCO Alaska, Inc. reperforated DS 9-08i in the Ivishak Sand of the Prudhoe Bay Unit on 1/3/90 (11460-11519' MD, ref. log BHCS 10/30/76). Seawater was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/ lubricator tested to 1.2 times the maximum expected surface pressure. A summary of the work is below: Rig up perforating unit on 1/3/90 and pressure tested equipment to 3000 psi. Backflow gas onto wellbore to depress lequid level (WHP 1800 psi) Bleed off WHP to drain system for drawdown. SI well. Shot 11507-11519' MD, 1/16 spf. Shot 11460-11498' MD, 2/19 spf. Secured well. RD. Returned well back to production. RE(SE] ED Alaska Oil & Gas Cons, Anchorage ,, ARCO AI...A,.?KA, INC:, P~O, BOX iii~'OS6<~ .... - .... ANCHORACE, ALASKA 995i~ DATE~ 6-27-9i REFERENCE: ARCO CASED HOLE FINAL.£ t-.25 5--3i--9i LEAK DETECI'ION RUN i, 5' 2-3 5-3t-9i F'ROD PROFILE RUN 3-13 5-3t -91 INJ F:'F~OFIL..EE RUN 4-t3 5-29-9t INJ I::'ROFIL. E RUN i, '5' ~]:~3 6-'8-9i CBT RLJN t, 33 6-8--9t CET RtJN t, 5' 6-.t 6-..5.-9i F'FC RUN i , 5' 9-8 '.5-S t --9 t F'ERF BREAK DOWN R~JN 9--23 6-t-9t F'ROD PIq'.C)F:'Ii_E] RUN i, · - t t-~ ':~--~"~-~t POST ~RE~KDO~N RUN ~ , PLEASE SIGN AND RE'I'URN THE ATTACHED COF'Y AS RIECEIF"F OF DATA. REECEIVED BY .................................... HAVE A NICE DAY! $ONYA WALLACE AT0-t529 / APF'ROVEI) TRAN,S'~ 9 t CAMCO CAMCO CAMCO CAMCO SCI-'! S C H A 1' L.. A ,S' CAMCO C A M C 0 C A H C 0 CAMCO DISTRIBUTION "" CENTRAl_ FILES ~"" PHILLIPS '1~ '.""'CHEVRON F'B WEI_L FILES D & M R & D '"' EXTENSION EXF'LORATION ~.' BPX ~ EXXON ~ ~, ..' STATE OF ALASKA MARAI'HON I'EXACO ~' MOBIL *"'FHE CORRECTED AF'I-f,: FOR 2-S IS 5G-029-20077 ** THE CORRECTED WELL NUMBER FOR THIS LOG IS t6-9A RECEIVED JUL 1 1991 Alaska Oil & Ga~ Cons. Commission Anchorage P ANCHORAGE° ALASKA .995 DATE: 5-.,.4-~t -.. REFEkENCF: ARCO ~.-.t 6 .'.. 2-24 6--t3 9-4 9-8 - 9-.1 6 9-t7 9-22 I)-7 ..---9-.4 t2-t6 IS-7 t3-28 . CASED HOLE FINALS 4-28-9t F:'ROI), PROF', RUN 4-28-9t PROD, F'ROF, · ...... RUN 5-5-9t PROD, F'ROF, RUN 5-5-9J LEAK DETECT. RUN 4-30-9i GR RUN "5-6-91 .............. --IN J; ' PROF~ .............................................................. _- RUN 4-'25-9i IN J. F:'ROF. RUN 4-25-9~ IN J. F'ROF. RUN 4-t 8-9t F:'ROD, PROF, RLJN 4-t 7-91 LFAK DEI"IECT, RUN 5-2-9t F'ROD, F'ROF,-GA,.? LIFT RLIN 5-4-9t .... LEAK DETEC. T. RUN 4-t7-'9~ (;AS ENTRY RUN ............. . ......... PLEASE SIGN ~, 5' CAMCO ~, 5" C~HCO ~, 5" [;ANCO ~, 2'& 5' CAMCO t , 5' CAMCO t -;-5 · ......... CAMCO t; 5 · CAMCO t, 5 · CAMCO t , 5 · CAMCO t , 5" CAMCO ~, 2'&5' CAMCO t , 2"&5" CAMCO t, 2'&5" CAMCO .. . AND RETURN THE ATTACHED COPY AS RECEIF"r OF DATA RECEIVED BY ............................... ' HAVE A NICE DAY! SONYA WALLACE ATO-t 529 DISTRIBUTION CENTRAL FILES CHEVRON .............. D&M EXTENTION EXF'LORATION EXXON MARATHON HOBIL ~ F'HII_L IF'$ · F'B WELL FILES .................. R & D -. · '. BF'X ........ ,,. $'FA'FE [)F ALASKA TEXACO STATE OF ALASKA ALASK/ ',L AND GAS CONSERVATION C..__..,MISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing Repair well Change approved program 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24'W of SE cr, Sec. 2, T10N, R15E, UM At top of productive interval 980' N & 1102' W of SE cr, Sec. 36, T11N, R15E, UM At effective depth At total depth Anchorage 1178' N & 1338' W of SE cr, Sec. 36, T11N, R15E, UM Operation shutdown Plugging Pull tubing Variance 5. Type of Well Development Exploratory Stratigraphic Service X Re-enter suspended well Time extension Stimulate Perforate X Other X 6. Datum of elevation(DF or KB) 54 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-8i 9. Permit number 76-70 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11795 feet Plugs(measured) 9088 feet Effective depth: measured 11636 feet true vertical 8975 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 71' 20" 300 sx AS 71' 71' Su dace 2659' 13-3/8" 4300 sx AS 2713' 2713' Production 11173' 9-5/8" 1000 sx 'G' 11227' 8659' Liner 873' 7" -- 11790' 9065' Perforation depth: measured 11460-11498'; 11507-11519'; 11529-11539'; 11545-11557'; 11564-11569' true vertical 8849-8876'; 8883-8891'; 8898-8906'; 8910-8918'; 8923-8927' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, NPCT@ 10755' MD; 4-1/2", 12.6#, MN-80, NPCTtail @ 10881' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 10744' MD; 5-1/2" Otis RQY SSSV @ 2212' MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation I 15. Status of well classification as: April 1991 16. If proposal was verbally approved Oil Gas Suspended Name of apl)rover Date apl)roved Service Injector 17. I hereby certify that the f~e and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity . BOP Test Location clearance ~ Mechanical Integrity Test Subsequent form required 10- Approved by order of the Commissioner , ssioner Form 10-403 Rev 06/15/88 Date IApproval No~/ SUBMIT IN TRIPLICATE 682 DCR c: J. Gruber, ATO-1478 SW JWP DS 9-08i PROPOSED CTU CEMENT SQUEEZE PROCEDURE ARCO Alaska, Inc. proposes that a CTU Cement Squeeze be performed on Well 9-8i. The squeeze will be performed as follows: I ) Slickline tag. Changeout LGLVs for DGLVs. casing to 3000 psi. Pressure test 9 5/8" 2 } CTU acid wash of perfs (12% HCL ! 10% Xylene only). Overdisplace acid into formation with seawater. 3 ) Cement squeeze of all perforations in the well. Target squeeze pressure is 3500 psi. Perfs to be squeezed are as follows: 11460 - 11498' MD (Z2/1B) Ref Log: BHCS 10/30/76. 11507 -11519' MD (ZlB) 11529 -11539' MD (Z1B) 11545 -11557' MD (Z1A) 11564 -11569' MD (Z1A) 4 ) Hold squeeze pressure for one hour. 5 ) Cleanout excess cement in wellbore. 6) Leave well shut-in for one week to let cement set up. 7) Reperforate at 4 SPF: 11490- 11498' MD (Z1B) 11507- 11519' MD (Z1B) 11529 -11539' MD (Z1B) 11545 -11557' MD (Z1A) 11564 -11569' MD (Z1A) Ref Log: BHCS 10/30/76. Add perforations at 4 SPF: 11519- 11529' MD (Z1B) Ref Log: BHCS 10/30/76. 11539- 11545' MD (Z1B/1A) 11557- 11564' MD (Z1A) 8) Return well to injection. 6 5 4 2 COILED TUBINO UNIT BOP EOU ! PHENT 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 HIRELINE BOP EOUIPHENT 1. 5000 PSI 7" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIRELIN£ RAuS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, IN[:. I::'.0. BOX ~00360 ANCHORAGE, ALASKA R Ii:.: F:' E SIC-MA & F" LJ I:;,' t) Fi:UN i, 5:" F;:U N i , 5" R' U N i , 5" ~.,'tlp! t , ':~'" ,: ..... · RUN i , 5" RUN t, 5" RUN t, 5" i:(LJNt, 5" I:;..'UN t , ... RU~'....! ~, 5" I:;: E C: E :1: V E i') I:.:"f' :'"':i 'l'l...A S ATLAS ,.!.,'CH A I'i.. ' .... f"l ,.<,..' C: H AfL. A;?:' CAMCO S C H ,q'rl...AX A 'fl_ ¢.:~ 2 .i:) :!: :::.,'TFi: ]: BUT ]:(:)N R CF. IVED dAN 14 1991 Alaska 0il & Gas Cons. Commission Anchorage A N C !.-I 0 F:.: A ('.: ;E, A t_ A £' K A "'",,' "';:.,' ..,."::"; ,':,,, F-L U I D !R E :? I $ T ! V i '!' Y PJ U L T i C H A N N ~: L ',,'~ F, "~' 'r i -," HULTir'-:HANNFL VEiRTiLOG A C:: 0 U 5' 'i" l *.3 C: E,' t.../V :()1 ....... ' C,. I:;..' i"i, A (; N !E t_ ('i C.:- - ?q t..j L 'T' ]: !::' ]: J"~ (:; E: F;..' E[ .~) C A J._ ]] J::' E F;..' V E: F" 'T i l... O C- ( i:;.: A W ) ( C F' ;0 ',,. q't F,' U i::: U N i;..' U r'-.I. F;..' U hi F: U F;.: U N F..' U N 4 i, i, i, i, i, i: i, A 5: J:;.: E CIE i F' 7' C) F: .'() A i"A ~ '.5-. i(!:," ~ ..::). 5 '.5 T !q, IE D ! £' i" F.,' i BUT t :~ C::FZ h!'i' R A L I:: i I_E2 ,,-'" C I'-i E ",," F..' C) N .r::, & M :Il: E: X 1" E N 210 N IE X F'L 0 f,: A T I 0 N ~" E X X (3 iq H ;'"; IR A T I--t 0 N ~,~. MOB I L · ,- F' H I 1_ L I F' 5: F'B bELl_ F']:LE~: IR & D · ,,- l': F'X ~ 3"T'A'i'E OF AL.A,~-~KA 'i"EXACO CORREC'T'ED AP'J:~ FOR 9-8 IS 5':_:."-('}2':':;'-2(:)23('}., Alaska Oi! e.:,-:~:.:-,~' Cons. Cornmissmr An:borage AHCHORAGE, ALAS'KA 995 i (~ DATE' 3-2i-90 REF'EiRENC;E:' ARCO PRE22URE DATA ~-":"~:.. ~.~._ i -24-"?0 BHI-' .... STATIC HR.~: 4-6 2-5-90 BHF ....~¢,TATIC GRADIENT CAMCO 4-28 ~ .- '~'- 9(:;, BI4P--~TA'I'I C GRADIENT CAMCO -- ~.-~,.- (~) BHF ...... ~'TAI'tC GRADIENT [)ANCO 4--:.3 ~ S.-~-90 BHF ....,~TATIC GRADIENT CAMCO 4--J2 2"~'90 BHF ..... ~'TATI C GRADIENT CAMCO 9-8 ~ -2(.)-9t~ BHF ....S~TATIC GRADIENT CAMCO 9---S0 2-~(~-9e Bt-IF ..... ~l'Al'IC GRADIENT CAMCO 9-32 2-~ J2 J~ q...o , - ~,.6-8~ BHF'--S'TATIC GRADIENT CAMCO J2-Ji ~-25-89 BHF'--STATIC GRADIENT CAMCO ~2 .... ~4 i2-4-89 BHF'--~'TATIC GRADIENT CAMCO ~'2---~8 2-~4-99 BHF'--~TATIC GRADIENT CAMCO i2-39 ~2-29-89 BI.-IF'--FLOWING GRADIENT CAMCO J 3-27 '2.--J 6-9~ BHF'--FLOWING GRADIENT CAMCO JS-3~ 2-t5-9~ BHF'--FLOWING GRADIENT CAMCO J3-33 2-J5-9~ BHF'--~TA'[IC GRADIENT CAMCO J6-5: t-~7-9~ BHF'--STATIC GRADIENT CAMCO PLEASE ZIGN AND RETURN THE ATTACHED COPY A,~ RECEIF'T OF DATA, RECEIVED RECEIYEI) BY' _~___~~7( MAR ? 1990 HA VE A N I CE DA Y ! Alaska.Oil & Gas Cons. GO~s~:~ ,,~ ,~ALL_Y HOFFECKER ~C~O~g8 AF'F'ROVED(~_ AT0-~529 TRANCe 9~'?- DISTRIBUTION CENTRAL FILES ~ ~ F'I'-t ILL I F'~" CHEVRON F'B WELL. FILE.? ~" D & M .," F: & D EXTENSION EXPLORATION $ BPX ~ EXXON ' ~ 6'TATE OF ALASKA MARATHON '~ TEXACO · " MOBIL .... ., ._.' .? ,':'.", L.. L '¥" ~.-~OF'~:t:.::,:::?..' ~"'i:;.: ~,R -- 6 l~ .,'~:~'t~:~.:OV~::, .~__ A'i"O .... i I:.~:29 Alaska Oil & Gas Cons. CommiSS[O~ 'rF:.AN,~: Anchorage !';'. :i: ,'? T F.: i B U T ]: 0 N · ~J: (:: IE i'"-i 'T R A 1.. F :[ L F',? :Il: f":: l..i I:Z ;v' F;..' 0 N D & M ..-s. E X T E N 5' I 0 i"'.i E X P L 0 R A T l' 0 N '"' E v'-z 0 N M A R A T H 0 N · "'..- M; 0 B i L F' I"1 i t_ L i F'B WELL_ F']:L_E£' R ~ D BF'X 2TATE OF AL_ASKA TEXACO AF;.iCO AL. ASKA: INC, F:'.,O, BOX i00~60 ANCHORF"~GE, ALASKA .()ATE' i -i 6-90 REFEI;,'ENCE · ARCO CASED HOLE FINALZ i-4 i -2:.5 'Z _ ") 'Z ._.l ,~. 7-i7 i 'i-23 i..°-i i i .5.-5'.'_") 'i 6-'i 9 © ";~- 8~' F'IT;".." 2-i 5-89 PRODUCTION PR'OF:iI_E/F'IT$ 2-t 4-89 GAS' LIFT ~.'URYEY 2-20-89 LEAl( DE'rEt:]" I ON -3-90 COLLAF;:/F'ERF -6.-9¢ COI_I_AR/PERF' 2-i 8-89 PI:;tOPUC"I' ION F'ROFIL. F 2.-i 4-89 LEAl( DETECTION 2-22-8? F'RODLICT !ON PRUF'!LE RUN i, 5:" RuN i , 5" RUN "~ i ".*-~' ' RUN i, 2",.S, 5" RUN i , ~." RUN i, 5" RUN i , 2.:" RUN i., 2 "&_~i:" RUN. i , ~.":"" PLEASE SIGN I;:ECE I VED BY HAVE A NICE DAY! AND RETURN THE ATTACHED :S'ALLY I--IOFFECi< FR ATO- i 529 COF'Y AS,' NECEIF'f' DISTRIBUTION OF' DATA, ~ CENTRAL FILE&' ~"~ CHEYRON D & M " E'ZTENS'i ON EXPLORATION ~" EY. XON MARATHON ~ MOBIL F'HILLIF'~ F'B WELL FIL. EZ R & D BF'X ZTATE OF ALASKA TEXACO r3 A d CO C A r.i C 0 C A ri C O C A [i C ~. J A IL. A ,}:.' Ail_AS C P, ¢-i L: 0 C A ['! C ('J ..... t.; i::i ~'i L; LJ ARCO Alaska, Inc. Prudhoe Bay ~,~,jineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager November 9, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Well No. 9-8 (33-36-11-15), Permit No. 76-70 Dear Mr. Chatterton: Attached, in triplicate, is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/GSS/sl Attachment cc: J.S. Dietz, BP Exploration J. Gruber- ATO 1478 PI(DS9-8)Wl-3 RECEIVED NOV 1.. Nas!~. 0il & 6as Cons. c0mmlssi0.1~ ~,nch0rage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR38--6132-C STATE OF ALASKA ALASKA' AND GAS CONSERVATION CC_ IlSSIONiCJ APPLICA'r ON FOR SUNDRY AP ROVA'LS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pulltubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1816' N & 24' W of SE Cr. Sec. 2, T10N, R15E, UM At top of productive interval 980'N & 1102' Wof SE Cr. Sec. 36, T11N, R15E, UM At effective depth At total depth 1178' N & 1338' Wof SE Cr. Sec. 36, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-8 (33-36-11-15) 9. Permit number 76-70 10. APl number 50 - 029-20230 11. Field/Pool Prudhoe Bay Oil P_oo/ RE I::iV D 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 71' Surface 2713' Production 11227' Liner 873' 11795 feet Plugs(measured) 9088 feet 11636 feet 8975 feet Junk(measured) Size Cemented 20" 300 Sx AS 13-3/8" 4300 Sx AS 9-5/8" 1000 Sx 'G' NOV :[, Alaska 0il & Gas Cons. C0mmissl Anchorage Measured depth True vertical depth 71' 71' 2713' 2713' 11227' 8659' 7" ---- 11790' 9065' Perforation depth: measured 11545-11557', 11564-11569°, 11304-11322', 11379-11395', 11418-11444', 11460-11498', 11507-11519', 11529-11539' true vertical 8737-8750', 8791-8802', 8819-8837', 8849-8876', 8883-8891', 8898-8906', 8910-8918', 8924-8927' Tubing (size, grade, and measured depth) 4-1/2", 12.64¢, MN-80, 10881' MD NPC; 5-1/2", 17#, L-80, NPC, 10755' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 10744' MD; Otis RQY SSSV @ 2212' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation November 1987 16. If proposal was verbally approved Name of approver Date approved Service WAG Injector 17. I hereby,.4:ertify that the,,foreg.ging is true and correct to the best of my knowledge. Signed .~¢~.,~,,~~~.~_ .~_ Title Operations Engineering Manager FOR (~OMMI~ION LI~I:: ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance 10----~ Mechanical Integrity Test Subsequent form required Approved by order of the Commissioner ORIGINAL SIGNED BY 15. Status of well classification as: Oil Gas Suspended Date / ¢-.~/(~;~'7 :orm 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 9-08i PROPOSED RE-PERFORATIONS API # 50-029-20230 PERMIT # 76-70 ARCO Alaska, Inc. proposes to reperforate previously perforated intervals in DS 9-8 within the Sadlerochit Sand from the Prudhoe Bay Unit. The proposed perforation intervals are as follows: Ref. BHCS Footage Flow (10/30/76) ('MD) SPF Zone Unit 11460-11498 38 1/12 2 11507-11519 12 1/6 1 Reference Log: BHCS (10/30/76) Perf Depths ('MD) Ref. CNL(3/11/77) R6 11460,11472, 11480, 11494- R7 11507, 11513 Well 9-8 is a WAG injector that is currently injecting SWI. The wellbore fluid present when the perforations will be shot is water. The expected bottom hole pressure is 3700 psi. All wireline work will be done through a 5000 psi WP BOP/lubricator, tested to 1.2 times the maximum expected surface pressure (diagram attached). RECEIVED Alaska 0il & Gas Cons, Anchorage 4 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6'" FLOW TUBE PACK-OFF RECEIVED NOV 1 ~ 1~ A~s~ Oil & G~s Cons, Anchorage H ] REL ! NE BOP EOU ] PMENT I II ARCO ALASKA, INC. F'.O. BOX ~eeS6~ ANCHORAGE, ALA£KA 995~0 DATE' 8-tt-89 REFERENCE' ARCO CASED HOLE FINALS 7'-t 7-29-89 PRODUCTION PROFILE RUN ~, 5" 7-t2 7-28-89 F'RODUCTION PROFILE RUN 7-2~ 7-30-89 F'RODUCTION PROFILE RUN t , 5' 9-8 7-26-89 INJECTION PROFILE RUN t, 5' i2-S 8-4-89 F'ERF RECORD RUN t2-7A 8-4-89 F'ERF RECORD RUN i4-36 7-29-89 INJECI'ION PROFILE RUN iS-ii ?-~3t-89 F'RODUCTION PROFILE RUN i?-8 7-27-89 INJECI'ION F'ROFILE RUN l, 5' PLEASE SIGN AND RETURN ';'HE ATTACHED COPY Ag RECEIPT OF DATA. RECEIVED BY ATO-~ 52m 8~ ~ ~lasl~ Oil & Gas C,o~s. C~mm~W.~ Anchom.qe DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIF'$ PB WELL FILES R & D BF'X STATE OF ALASKA TEXACO CAMCO CAMCO CAMCO CAMCO ~'C!4 CAMCO CAMCO CAMC'O F;:tcF'F!]F;:I::'NF'.'F' AK'CO CA.~F-.T) I.-ti]1 r-: F:'t'i'..j¢.:l. l-t ~':':', 'w' F:' .,'::'~ i'..J T f": l:: f) ~.::, y ~ 8 F:' F' f; f.'.; ¥ ir-,' 1:.: NI F..! Ir. "(' T Cons. ;:'.'. "r' ,,'"~--. ~, '::..: ".::' ':;;' ~ ~.--...~ r, ,,,,omm,smon Anchorage 'Y' 1:¢ ,'% i",.~ :::.: :2: ::::: ,': . -._, / ,.:'.,, i::, ~:, ~:;: ~':'~ v ~=' 'r'~ ....~ .............................................. :.~.z:t_:' ~'" f':, !' :::: 'i" i:;.' T. i'.'-',i [ -[ F',, ARCO Alaska, Inc. Prudhoe Bay~gineeri~ Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 2~3 424~i{ Donald F. $cheve Operations Engi]~eeri.qg ~la~ager March 8, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-8 Approval No. 7-551 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI(DS 9-8)W1-3 0il & Gas Cons, Commlsslo~-~ Anchorage ARCO Alaska, inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASI,~.-~OIL AND GAS CONSERVATION COMk-._~.,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed' Operation shutdown '- Stimulate [] Plugging ~ Perforate ~ Pull tubing [] Alter Casing ~ Other ,~, 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1816' N & 24' W of SE Cr. Sec. 2, TION, R15E, UM 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-8 (33-36-11-15) At top of productive interval 980' N & 1102' W of SE Cr. Sec. At effective depth At total depth 1178' N & 1338' W of SE Cr. Sec. 36, TllN, R15E, UM 8. Approval number 7-551 9. APl number 50-- 029-20230 10. Pool 36, TllN, R15E, UM Feet Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 11795 feet 9088 feet Plugs (measured) Effective depth: measured 11636 feet true vertical 8975 feet Casing Length Size Cemented Conductor 20" 300 Sx AS Junk (measured) Measured depth True Vertical depth 71' 71' Surface 13-3/8" 4300 Sx AS 2713' 2713' Production 9-5/8" 1000 Sx 'G' 11227' 8659' Liner 873' Perforation depth: measured 71, 11529-11539' 11545-11557' 11564-11569' , , , true vertical 8898-8927' (3 intervals) ~bing(size, grade and measured depth) 4~", 12.6#, MN-80, 10881' MD NPC; 5½", 17#, L-80, NPC, 10755' MD Packers and SSSV(type and measured depth) Baker SAB Packer @ 10744' MD; Otis RQY SSSV @ 2212' MD 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 11790' 9065' 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure .... 7,000 -- .... 1,200 -- ~bing Pressure 1,000 1,350 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys 15. I hereby certify that the foregoing is true and correct to the best of my knowledge /' ~ Signed Title Operations Engineering Manager Form 10-404Rev. 12-1-85 WELLS/123 T. A. Billingsley, ATO-1506, 265-6871 Submit in Duplicate DS 9-8i COILED TUBING UNIT CEMENT SQUEEZE INJECTION PROFILE MODIFICATION 10/28/87 Pumped pre-squeeze acid wash through coiled tubing. Acid volumes with additives as follows: 33 bbls 15% HC1 33 bbls 6% HCl/1.5% HF 33 bbls 15% HCl Returned well to injection. 10/30/87 Pumped 56 bbls cement with additives through coiled tubing. Obtained squeeze pressure of 1500 psi and held for 60 minutes. Contaminated cement in wellbore. 10/31/87 Jetted out contaminated cement. Left well shut in. 12/2/87 Perforated: 11529-11539' 6 spf 11545-11557' 6 spf 11564-11569' 6 spf Returned well to injection. WELLS/123 ARCO AL. ASKA, INC,, P.Oo BOX tt~(~36(~ ANCHORAGE, ALASKA 995 t (~ DATE' 2-t 6-88 REFERENCE: ARCO CASED HOLE FINAl. i -4 t -,.,,...- 88 t -i S ~ -...,..-RR t -t 9 t -20-88 t -2~ t-2G-88 t -2~ 1 -24-88 4-7 2-4-88 4-1 E~ 2-~-88 ~-22 i -29-88 7- l 7 2-5-88 9-~4 i -2Z-88 i t -t 8 i -G~-88 ~ Z-i t -24-88 ~ Z-5 ~ -2Z-8~ ~ ~-i 7 i -2~-88 i Z-28 i -~-88 i4-~ i-o7-88~ t 6-2 i -25-8~ ~6-5 i-28-88 ~ 6-i ~ 2-t -88 i 6-i 9 i -28-88 t 6-2Q I -29-88 t 7-2 t -~1 -88 I 7-8 I -25-88 t 7-t 0 i -25-88 PR , PRFI...E/FM/TP/FD/W RUN FI..OWMETER RilN PR.D ,, PRFLE/F-M/TP/FD/W RI.IN PRO., PRFL F../HPFM/TF. MP/DEN RUN PRO , PRFI_.E/HPFM/TEMP/DEN/WH!IT RIJN PTT2/TEMF' RI. IN F'ITS/GR/TEMP RI.IN PIT.q' RllN F'I T,.~/TEMP RI.IN F'I T,~ RI. IN FI_OWMETER RI.IN PIT,~/TEMP RUN PRD ,, PFcFL. E/HF'FM/WHEIT RIJN PRO , PRFL. E/HF'FM/WH[!T/SR RL.IN GAMMA R. AY RUN PRD., F'R'FL.E/HPF'M R'I.iN PRD , F'RFLE/,S'F' T. N/TEMF'/WHIJT REIN I N,..I ,, F'RFL. E./FM/TP REIN I NJ ,, PRFi_E/HPFM/TEMP REIN F'I T,.~/TEMF' RUN F'RODIJCTION PROFILE RUN F'RD., PRFI...E/,SYF' I N/TEMF'/G R/WHUT RI.IN F'RD ,, F'RFLE/HF'FM/GR/WHUT REIN I NJ., F'RFL E/HPFM RUN INJ ,PRFLE/HPFM RUN F'LEA.gF SIGN AND RETIJR~ TH.F.~TTACHED COPY A2 R,~.F'T OF DATA., ATO-t5~9,:. TRANS ~881G5 /~ APPROVED ...... DISTRIBUTION CENTRAl_ FILES ¢ PHIl_LIPS CHFVRON P~ WE[.[.. FT[E~ D & M R & D EXTENSION EXPLORATION ~ SAF'C EXXON ~ ~ YTATE OF ALASKA MARATHON $ TEXACO MOBIl_. CAMCO CAMCO CAMCO CAMCn CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO P, 0, ¥-?, fi~ ¥ '~ '.'"') 01'z, 6 '."~ A i'.J C: 14 r)F;.' A f'~ I:i', A ] A .? I(. A ':? :i:, '=:: 1 ....... :~ E:. D 0 I... F;..' I:il F:' l!il I:~.! E:' N f'~ Eil' A R C f3 C A '' .... H t!!i F' ill N A I... i'5 T .? '1" F;.' T ¥:.,' I I "1" T I"i i'....I f'! F:' I.,.I A iii t~! A T ARCO Alaska, Inc. F'.O, Box i00360 ..... Anchorage, A lasl<a 995t0 I)ATE' Aug uss ~t, t9'8'?. REFERENCE: ARCO Cased HoI~ i~la~ ~-29 8-8-87 -F'rod, Profi le Run i-:~ 8-9-87 Prod, Profi Le Run i-S~ 8-9-87 F'rod, F:'rofi ~e RUn ~-:~2 8-.~8-87 Prod, Profi Le Ru~ · l..-~ 8-9-87 F'rod, I::'rofi Le Run T~.-9 8-t 6-87 l'emp. Log Run t, 5" 3-1~. ''' 8 -- 8- 87 I n j . F:' r o f i L e R u n ~--t8 8--E,-8'7 Inj. Profiie Run 1, 5" ;~ .... 27 8--~6-87 F:'rod. F'rofi [e R. un ~---~ 8--t(')-87 GR/l'e~,{p/Prod. F'ro'fi ie Yurvey Run 4..-~ 8-t6-87 Prod. F'rofi Le Run 4-6 7/L~t.-.8/t/87 Leak De'l'./'Temp/Fiowme~er Run ~, 2" 4 .... 27 8-6-87 Inj. F:'rofi Le/Temp./FLowmeter Run 4-S2 8-~6-87 F'rod. F'rofi I.e Run ~, 5" '~ 8/t .... 2/87 Leal< Det'/l'emp Log Run t, ~,. 7 .--~. '') ;~. 8 -- t ~.9 - 8 '7 F:' ~ o w m e T e r R u n t , 5" 9-t 8 .... t7--.87 X---Y CaLiper Run 9.--;~ 8-t3-.-87- F'rod. F'rc,'fi ie Run ~, 5" 9..- 8 8--. 7.-- 87 I n .j. F:' r o f i L e /T e m p. / F L o w m e ~ e r R u n 9 .... t8 8 .... 7.-87 In j. I::'{"o'fi Le/Te~,{p./FLowmefer Run t, 5" 9- S t '~.-. 29- 87 F' r o d. F:'r o 'f i L e R u n t~ '') .-.. ~:"' ~) ..... 8 ..--% - 8 '7 I n j. F:' r (::, f ~ I. e R u n ~ , 5" Ca fllC o Camco Ca mc o Camco Casco Camco Caf,{co Camco C a tfl c o Camco C a m c o Camco C8 hlC 0 Camco Camco Camco ' Camco Camco · ~: C e n .!: r a I I:: i l e ~' :,",:C h e v r o n l) & i',l · ,,.'"' ii-: x T e n .s' i o n Ii-: x p I. o r a 't' i o n '11' M a r a T h o n · ,.'"' f'l o b i I ARCO Alaska, Inc Prudhoe Ba'~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 18, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-8 Permit No. 76-70 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp At t a chment cc: Standard Alaska Production Company P1 (DS 9-8)W1-3 to be RECEIVED Alaska Oil & Gas Cons, Commfss[on ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCornpany AR3B--6132-C STATE OF ALASKA ALA~.A OIL AND GAS CONSERVATION COt,._,,ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well C Alter casing ~ Time extension F~ Change approved program [] Plugging [] Stimulate [] Pull tubing Iq, Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1816' N & 24' W of SE Cr. Sec. At top of productive interval 980' N & 1102' W of SE Cr. Sec. At effective depth 2, TION, R15E, UM 36, TllN, R15E, UM Attotaldepth 1178' N & 1338' W of SE Cr. Sec. 36, TllN, R15E, UM 5. Datum elevation(DF or KB) 54' RKB 6. Unit orPropertyname Prudhoe Bay Unit 7. Wellnumber ~r~I 9-8 (33~6-11-15) 8. Permitnumber 76-70 9. APInumber 50-- 029-20230 10. Pool Prudhoe Bay 0il Pool feet 11. Present well condition summary Total depth' measured true vertical 11795 feet Plugs (measured) 9088 feet Effective depth: measured 11636 feet Junk (measured) true vertical 8975 feet Casing Length Size Cemented Measured depth Conductor 20" 300 Sx AS 71' True Vertical depth 71' Surface 13-3/8" 4300 Sx AS 2713' 2713' Production 9-5/8" 1000 Sx 'G' 11227' 8659' Liner 873' 7" -- 11790' Perforation depth: measured 11545-11557' 11564-11569' , 11304-11321', l1379-11395',tme veftic~ 11418-i1444'' 11460-11498', 11507-11519', 8737-8750' 8791-8802 , 8819-8837' 8849-8876', 8883-8891', 8898-8906' 8924-8927' ~bing(size, grade and measured depth) 4½", 12.6#, MN-80, 10881' MD NPC; 5~"2 , 17#, L-80, NPC, 10755' MD Packers and SSSV(type and measured depth) Baker SAB Packer @ 10744' MD~ Otis RQY SSSV @ 2212' MD 12.Attachments 9065' 11529-11539', , 8910-8918', Description summary of proposal ~¢ Detailed operations program © ~,_~BOP~sketch ~ 13. Estimated date for commencing operation August 1987 14. If proposal was verbally approved Alaska 0ii &Gas Cons, Name of approver Date approved Ano¢~0:~ne 15. I hereby/,,qertify that the foregoing is true and correct to the best of my knowledge Signed '~'~'¢~ ,~'~ Title Operations Engineering Manager Date Commission Use Only Notify commission so representative may witness I Approval E~ Plug integrity ~ BOP Test [] Location clearanceI Conditions of approval Approved by · C'O rd m i ~"Si o'n e r by order of :" the commission Date / ? ~O¢' submit in trip ate~ Form 10-403 Rev 12-1-85 WELLS/123 T. A. Billingsley, ATO-1506~_~265-6871 DS 9-8 CTU SQUEEZE PROCEDURE I · · · 0 e · · . 9, Tag PBTD with slickline. RIH with coiled tubing· seawater injection. Lay in 35 bbls of cement. Ensure well is fluid packed by continuing Pressure up on squeeze to 5200 psi BHP and hold for 1 hour. Contaminate cement to PBTD. Jet out contaminated cement. Wait at least two weeks before reperforating. Nitrogen lift top 2000' of fluid to provide drawdown during perforating. Reperforate the bottom three Lower Romeo intervals. Reference BHCS 10/30/76. 11529-11539' Lower Romeo 6 SPF 11545-11557' Lower Romeo 6 SPF 11564-11569' Lower Romeo 6 SPF 10. Evaluate injectivity into Lower Romeo· Perform stimulation if necessary (separate AFE). 11. Reperforate remaining Lower Romeo, Upper Romeo, Tango and Lower Victor at limited shot density. Reference BHCS 10/30/76. Very limited SPF Limited SPF Limited SPF Limited SPF Limited SPF 11304-11322' Lower Victor 11379-11395' Tango 11418-11444' Upper Romeo 11460-11498' Upper Romeo 11507-11519' Lower Romeo 12. Return well to injection. 13. Run post-squeeze injection profile. 1 TAB/120 5 1. 5000 PSI 7" WELLHEAD CONNEC?OR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 5. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PS1 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 4 3 2 I ii 3 2 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) 5. 5000 PS1 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF WIRELINE BOP EQUIPMENT iii ARCO A~aska, loc. P.O. Box i~nz6~ 9-8'/' 5;:'- '.: ---~-:::.~:~ 9- i '-2 '/ 5-'2'-'::.:-.:6 'i i -1 7,/ 5'---6--S6 ~ .?_~ .:.; v' 5-.7-86 "'~' -- '-, ;.". ";: _'3', __ 0 z. i S'-? ,/ 5'-":?-86 · ! .5; - 4 8. / ~':'J--- '-'7 - 86 t; 4-~ a v" _, -- '.-:. -::}- 86 14-'-''~:,/ 5-2 '-'' ~ 4-27,/ 5-¥-86 ~ 4-7.6/ 5-6-86 ! 6'~ d.-~ *.: ~-'~:.4-o~' ARCO t-.}'asea !'~.'-_.. La r:'i.n::~ i. C -3 A'i ~ C) '--.7.: a ~'~'~ c o i.-: a ~'fl c 0 t'} a ~','., c c.' Ca mc 0 ,-. a t'f~c o Oti~ Ca f~c o Camco .... =c: eo copy a~. '.,-ecei~,t ._-,f data. Received By___ HAVE A NiCE DAY-" ;:- u-: :':..."-.- ~ 0il & Gas Cons. ~ .......... Anchors~ TRAN£ Di£TR!BUTiOt.{ ARCO Alaska, Inc Post Office E~'Sx 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 DAte: August 21, 1985 REference: ARCO CH Finals 1-8j 8- ~6-9 ~ 7- ~9-8 -- 8- ~'-D9-12/Spi 8- ~ '~-~13-6~ Spi 8- ~15-20~Spinner 7- ~'~ 5- 20 ~ollar 7- ~"~ 16-10 ~Spinner 7- Spinner Temp Spinner nner nner nner 15-85 31-85 8-85 8-85 8-85 7-85 26-85 15-85 25-85 Run 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" Camco GO Otis Otis Otis Otis Otis GO GO Please sign as Received by Pam Lambert ATO ~429C Trans 282 receipt of data. t.:,-,.~.~ u;t & b~s Cons. COITlm]ssioll AHc?~oFaDO Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State' of Alaska Texa co ARCO Alasi<a thc, ,s a SuDslcliary of AtlanticRichfieldComoan¥ ARCO Alaska, Inc. Prudhoe Bay L.~ neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 22, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-6 DS 3-7 DS 3-10 DS 3-18 DS 4-6 DS 4-8 DS 4-11 DS 4-14 DS 4-15 DS 9-8 DS 9-10 DS 9-12 DS 9-14 DS 9-15 DS 9-16 Permit # 76-60 Permit # 76-53 Permit # 79-21 Permit # 79-103 Permit # 76-42 Permit # 76-10 Permit # 78-6 Permit # 78-36 Permit # 78-37 Permit # 76-70 Permit # 76-82 Permit # 77-7 Permit # 77-25 Permit # 77-36 Permit # 77-37 DS 9-18 DS 9-17 DS 9-19 DS 9-20 DS 11-2 DS 16-1 DS 16-2 DS 16-3 DS 16-5 Permit # 77-39 Permit # 77-38 Permit # 77-40 Permit # 77-41 Permit # 81-128 Permit # 80-136 Permit # 80-150 Permit # 76-83 Permit # 81-37 DS 16-10 Permit # 80-04 DS 16-11 .Permit # 80-118 DS 16-16 Permit # 80-127 DS 17-6 Permit # 80-132 DS 17-8 Permit # 81-74 DS 17-10 Permit # 81-97 Dear Hr. Chatterton: Attached are Subsequent Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. S cheve RECEIVED Attachments JAN 2 5 1085 cc: Sohio Alaska Petroleum Company Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. la a Subaldlary of AflantlcRIchfleldCompany STATE OF ALASKA ALASKA 0IL AND GAS CONSERVATION COI~IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-70 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20230 4. Location of Well 1816'N & 24'W of SE cr Sec. 2, T10N, R15E, UM 9. Unit or Lease Name Prudhoe Bay Unit 980'N & 1102'W of SE cr Sec. 36, TllN, R15E, UM 1178'N & 1338'W of SE cr Sec. 36, TllN, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 54' RKB ADL 28324 10. Well Number DS 9-8 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. has converted DS 9-8 to water injection service. The well is part of the Flow Station 2 waterfloodproject. The well began receiving water on June 14, 1984. 14. I hereby cffClify that the fo, r, egoir~ is true and correct to the best of my knowledge. Signed .... Title R~j±onal F~cj±neer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1~80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate A,r';,' C 0 A L ...?~ .'.:~.' k a, .'[ n F:' ... (.')., '8 i::, x t ,3 0 5 6 ¢ A 'n ,::: h ,:::, r a g ,:.:..',, A I. a .s k a 99.5 I::' I1 t;:' fl t::: tt ....' I'" It I::' II 1:' u t::' 1t t::; . ....' · ") II °..%. I'.:el.l.y McF:'ar I. and A"f' 0 ..... i 4 2 9 F:' :. '.' ,:> (L" ,7 Ch evr on D ,.:".": M IE x l:) I. o r a t' i o'n ,~-;' e r v i c e.-'~ lii;x'l:ens'io'n E;xpl. orat ion Ex xon (.; e t' 't y M ,:.:, r ,::,, !' h ,.'::, 'n Hob i I. M,:.::ll:: i I.~::."" ."~!.,. F:' Phi I. L i l::'.s' F:' 'r' .. ,'I h (::, e B a 'x' W 6:: i. I. F;.: & D ,S'oh i o State of ALaska ARCO Alaska, In~,.~-~ Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 August 1, Reference: 1984 ARCO Pressure Data D.S. D.S. 1-25 D.S. 1-26 D.S. 3-19 D.S. 3-22f- D.S. 3-23~- D.S. 6-17 D.S. 7-7A . D.S. 7-13J' D.S. 7-14 .... D.S. 7-16J' D.S. 7-16'-~- D.S. 9-8'~ D.S. 9-18f'- D.S. 12-16~-~ D.S. 12-17 D.S. 13-33-~- D.S. 14-8~. D.S. 14-23 D.S. 14-24 D.S. 14-25 D.S. 14-32 D.S. 14-33 D.S. 14-34 3-15-84 PBU/CDBR 5-25-84 PBU/CDBR 5-30-84 PBU/CDBR 5-25-84 PBU/CDBR 6-29-84 PBU 5-24/25-84 CDBR 6-16-84 Static Survey 6-15-84 Static Survey 6-14-84 Static Survey 6-14-84 Static Survey 6-30-84 PBU 7-2-84 PBU/CDBR 6-20-84 Static Survey 6-20-84 Static Survey 6-21-84 Static~Survey 5-19-84 CDBR 5-20-84 CDBR 6-22-84 PBU/CDBR 6-28-84 Static Survey 5-16-84 CDBR 5-17-84 CDBR 5-18-84 CDBR 5-20-84 CDBR 4-29/30-84 CDBR 5-19-84 CDBR Otis Camco GO Camco Camco GO GO GO GO GO GO GO Camco Camco Camco Camco Camco ., P/lease sign and return ~ data. the attached copy as receipt of Kelly McFarland ATO-1429F Trans. ~290 DISTRIBUTION ~hevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon Mobil " 0ii ~ '-?~' Mob i l E & P "~gChnr~_.~ ~L~e" 6°m/z?issgg ?hillips Prudhoe Bay ~ell F~les R& D Carolyn Smith Sohio State of Alaska ARCO Alaska, Inc. Prudhoe BaY~ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 26, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-1 DS 9-3 DS 9-8 DS 9-11 DS 9-13 Ds 9-19 Permit No. 75-76 Permit No. 76-35 Permit No. 76-70 Permit No. 76-84 Permit No. 77-8 Permit No. 77-40 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/kg Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 1)W4-3 File Pi(DS 3)W4-3 File Pi(DS 8)W4-3 File Pi(DS 11)W4-3 File PI(DS 13)W4-3 File Pi(DS 19)W4-3 ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ,'~_~/" ALASK .... .)ILAND GAS CONSERVATION'i+~.-~:vlMIBSlON COMPLETION OR RECOMPLETION REPORT AND LOG WELL 1. Status of Well Classification of Service Well Water Injector OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICEI~ 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-70 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50-029-20230 4. Location of well at surface 9. Unit or Lease Name 1816'N & 24'W of SE cr, Sec 2, TiON, R15E~ UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 980'N & l102'W of SE er, Sec 36, TllN, R15E~ UM DS9-8 (33-36-11-15) At Total Depth 1 1. Field and Pool 1178'N & 1338'W of SE er, Sec 36, TllN, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0il Pool 54' RKBI ADL 28327 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 10/4/76 11/2/76 Perf'd 5/16/77 N/A feet MSL 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 11795'MD - 9088'TVD 11636'MD - 8975'TVD YES ~ NO []I 2212' feet MD 1900+ 22. Type Electric or Other Logs Run DIL/BHCS/GR/SP, FDC/CNL/OR, OR/CNL/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94f~ H40 Surf, 71' 30" 300 sx Arcticset cmt 13-3/8" 72fAButt MNB0 Surf. 2713' 17~." 4300 sx Arcticset cmt 9-5/8" 47#Butt MNB0 & Surf. 11227' 12~4" 1000 sx Class G cmt S0095 7,, 29~A 10917, 11790, 8~,, ( 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) *New Perfs w/4spf SIZE DEPTH SET (MD) PACKER SET (MD) *11304 - 11322' MD (18') 8737 - 8927' TVD 5½" 10883' 10744' 11379 - 11395' MD (16') 11418 - 11444' MD (26') 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11460 - 11498' MD (38') DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 11507 - 11519' MD (12') N/A 11529- 11539' MD (10') 11545 - 11557' MD (12') 11564 - 11569' MD (5') 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) N/AI In j ect lng Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD I~ ... Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/ARECEIVED JUN2 8 191]4 Alaska Oil & 6as Cons, Commission Anchorage Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. GEOLOGIC MARKERS NAME Top Sadlerochit O/W Contact Base Sadlerochit MEAS. DEPTH TRUE VERT. DEPTH 11304' 11571' 8737' 8929' 8929' FORMATION TESTS 30. 11571' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ........ Title Regional Engineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this '~orm and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none" Form 10-407 ARCO Alaska, Inc Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 22, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-1 DS 9-3 DS 9-8 DS 9-11 DS 9-13 DS 9-19 Permit No. 75-76 Permit No. 76-35 Permit No. 76-70 Permit No. 76-84 Permit No. 77-8 Permit No. 77-40 Attached are "Subsequent Report" Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JCD/lmh Attachments cc: Sohio Petroleum File Pi(DS 9-1)W1-3 File PI(DS 9-3)W1-3 File Pi(DS 9-8)W1-3 File PI(DS 9-11)W1-3 File Pi(DS 9-13)W1-3 File Pi(DS 9-19)W1-3 ARCO Ala.ka, Inc. I. a Subsidiary of AtlanllcRIchfleldCompany STATE OF ALASKA ALASK/... IL AND GAS CONSERVATION C._W1MISSlON SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED W E L L;x~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-70 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20230 4. LocationofWell (Surface) 1816'N & 24'W of SE cr Sec. 2, T10N, R15E, UM (Producing Interval) 980'N & l102'W of SE cr Sec. 36, TllN, R15E, UM (Total Depth) 1178'N & 1338'W of SE cr Sec. 36, TllN, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28324 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-8 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing ~ Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, inclUding estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 5/10/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 11304' - 11322' MD (4spf), flowed well to clean up. Shut-in well, POOH, all shots fired. Ran SSSV, secured well, RD. Ref: BHCS 10/30/76 RECEIVED JUN 2 8 984 i Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the for_egoin~ is true and correct to the best of my knowledge. Signed ~C//~ ~~~ T~tle Regional Engineer The space below for Commission use Conditions of Approval, if any' Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay E~Tgineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 13, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9 Water Injectors Permit Nos: 76-70, 76-82, 77-7, 77-25, 77-36, 77-37, 77-38, 77-39, 77-40, 77-41 Enclosed are the Sundry Notices for Change of Well Status for the proposed Drill Site 9 Water Injectors. Very truly yours, D. F. Scheve DFS:SDC:kg Enclosures cc: SOHIO Alaska Petroleum Co. ARCO Alaska, Inc. ts e Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKA L,.~-AND GAS CONSERVATION CC_?,IlSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-70 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20230 OTHER [] 4. Location of Well 1816'N & 24'W of SE cr Sec. 2, T10N, R15E, UM 980'N & l102'W of SE cr Sec. 36, TllN, R15E, UM 1178'N & 1338'W of SE cr Sec. 36, TllN, R15E, UM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-8 11. Field and Pool Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 54' RKB [ ADL 28324 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well L~ Change Plans [] Repairs Made Pull Tubing [] Other [~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to change Well 9-8 status from oil producer to water injector. It will be operated as part of the Prudhoe Bay Waterflood Project. RECEIVED JUN 1 4 1984, Alaska Oil & Gas Cons, Commission AnChorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of Approval, if any: Approved by (IRIGINAL SIGNED IlI_ LOHHIE C. SMIT~ COMMISSIONER Ap~sroved Copy Re~rnecj By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, In¢ Prudhoe BaT~ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 19, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-1 Permit No. 75-76 DS 9-12 DS 9-2 Permit No. 76-16 DS 9-13 DS 9-3 Permit No. 76-35 DS 9-14 DS 9-4 Permit No. 76-40 DS 9-15 DS 9-5 Permit No. 76-47 DS 9-16 DS 9-6 Permit No. 76-48 DS 9-17 DS 9-7 Permit No. 76-58 DS 9-18 DS 9-8 Permit No~ 76-70 DS 9-19 DS 9-11 Permit No. 76-84 DS 9-20 Permit No. 77-7 Permit No. 77-8 Permit No. 77-25 Permit No. 77-36 Permit No. 77-37 Permit No. 77-38 Permit No. 77-39 Permit No. 77-40 Permit No. 77-41 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JCD/lmh Attachments cc: Sohio Petroleum File Pi(DS as above)W1-3 ARCO Aleska, Inc. ia a Subsidiary of AllantlcRIchfleldCompany STATE OF ALASKA ALASK,._~21L AND GAS CONSERVATION L_..MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 2. Name of Operator DRILLING WELL [] COMPLETED WELL 7. Permit No. OTHER [] ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well 1816'N & 24'W of SE cr Sec. 2, T10N, R15E, UM 980'N & l102'W of SE cr Sec. 36, TllN, R15E, UM 1178'N & 1338'W of SE cr Sec. 36, TllN, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28324 76-70 8. APl Number 50- 029-20230 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-8 11.FieldandPool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well ~] Change Plans [] Repairs Made Pull Tubing [-] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 9-8 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 11304-11322' MD Ref: BHCS 10/30/76 Subseque~t Work tleno~ecl ~aska Oit & Gas Cons, 14. I hereby certify that the foregoing is true and correct t° the best of my knowledge. The space below for Commission use Date Conditions of Approval, if any: Approved by ORIGTflAL SIGIt[D' 9Y IlMtRY I/. i~IGLEI Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Posl Ollice 8r 360 Anchorage, A~_;3 99510 Telephone 907 277 5637 January 21, 1982 Reference: ARCO PRESSURE DATA D.t S.9-3 11/20/81 D.S.3-4 11/20/81 D.S.17-6 11/15/81 D.S.3-2 11/19/81 D.S.17-1 11/15/81 D.S.9-1 11/21/81 D.S.16-16 11/15/81 D.S.16-1 11/14/81 D.S.4-7 12/2/81 D.S.9-8 11/15/81 D.S.16-11 11/14/81 D.S.9-5 11/22/81 D.S.9-15 11/24/81 D.S.4-6 11/25/81 D.S.9-6 11/16/81 D.S.3-18 11/19/81 D.S.9-4 11/21/81 D.S.9-12 11/20/81 D.S.9-10 11/20/81 D.S.3-6 11/18/81 D.S.3-7 11/18/81 Pressure Survey II II I1 ~1 !! 1! I! II Il Il Il Il Il Il Il Il Il Il II Il II Il II II D.S.9-6' 12/9/81 D.s.9-6 1/1/81 D.S.9-17 12/10/81 s. -6 D.S.12-9 1-/4/82 D.S.12-10 1/3/82 D.S.12-12 1/2/82 D.S.12-11 1/2/82 D.S.16-9 1/8/82 II II II II l! II II DISTRIBUTION /.~e'~se sign and return the attachedNORTHGEOLOGY R&D copy as receipt of data. DRILLING PHILLIPS Mary F. Kellis North Engineering SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M Pressure survey II Il l Il Il Il Il Il Il I! Il II Il II l I! Il II Il II GEOLOGY STATE OF ALASKA Transmittal #902 ARCO Alaska. inc, is a 5uL;~d~ary of AHJnhcR~chhe,dCo,-npany ARCO Oil and Gas C'-mpany North Alaska~_..st rict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer August 19, 1981 Reference: ARCO PRESSURE DATA D.S.9-8 5-8/9-81 Pressure Survey ~iign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #529 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOB I L GETTY ~~,,,~ PHILLIPs SOHIO MARATHON CHEVRON ARCO Oil ancl Gas Company is a Division of AtlanticRichfieldCompany ARCO Oil and Gas Company North Ala.~ ')ist rict Post Otfice'~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 4, 1980 Reference' Arco Pressure Buildup Data [ D.S. 9-8 . 5/2/80 Pressure Survey J 4 £NG____J ]'sTAT TE~c~J --J STAT TEaC I FILFi ~ p.s. 9-12 5/3/8o Pressure Survey "~Please sign and return the attached coPy as receipt of data. Mary Kellis North Engineering TRANSMITTAL #775 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON NOV 6 l:~ug Rlaska Oil & Gas Cons. Commission Anchorage ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany A!-~CO Oil and Gas Comp;~ny Januar7 11, 1980 Reference' Enclosed are Pressure Surveys for the following ARCO wel Is' D.S. 3-8 11/4-5/79 Camco D.S. 9-1 10/29-30/79 ' " D"i'~'~ '9'-g~''' 10/51-11/1/79" lease sign and retum the attached copy as receipt of data. K. J. Sahlstrom North Engineering TtGxNS~IITTAL t! 0tl DI, i }d I}IFFION North Geology ]}ri.11 :lng Eng. Hanager (.:co] ooy State o'f Ailaslca ]~XXOI1 Blob:l l Get ty Phi 11 Sohio ~,Iarathon C}~c\;ron AtlanticRichfieldCompany North Americ'~n Producincj Division Alaska Post Officc~.,"~'× 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 15, 1978 Reference: Enclosed are copies of the following Transient Pressure Buildup Surveys: .... D.S. #496: 10/2-3/78 Camco ~D.S. #4-7 10/4-5/78 Camco vD.S. #4-8 10-03-78 Camco v~.S. #4-10 10/6-7/78 Camco wD.S. #9-3 10/12-13/78 Camco v D.S. #9-4 10/14-15/78 Camco ~D.S~ #9-8 10/18-19/78 Camco ~ D.S. #9-10 10/16-17/78 Camco '~'D.S. #9-12 10/20-21/78 Camco ~D.S. #9-15 10/22-23/78 iCamco Please sign and return the attached copy of the transmittal letter as receipt of data. Very truly yours, R.A. Logue North Operations Engineering Transmittal #615 DISTRIBUTION North Geology Drilling Eng. Manager Dallas Geology State of Alaska D & M R & I) Exxon Sohio Mobil Marathon Phillips Chevron Getty AtlanticRichlieldCompany North American Producing Division North Alask '~istrict Post Office .... x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-1 DS 9-2 DS 9-3 DS 9-4 DS 9-5 DS 9-6 Permit No. 75-76 Permit No. 76-16 Permit No. 76-35 Permit No. 76-40 Permit No. 76-47 Permit No. 76-48 -7 Permit No.. 76-58 Permit No. 76,70 Permit No. 76-76 DS 9-10 Permit No. 76-82 Dear Sir: Enclosed please find a Completion Report for the above- mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer FMB:lr Attachments SUBMIT IN ~L['CATE* STATE OF ALASKA '(See other In- structions on OIL AND GAS CONSERVATION COMMITTEE ..... 'se side~ i i il ii i i I I WELL COMPLETION OR RECOMPLETION REPORT AND LOG* .... la. TYPE OF WEEL:' Oll,W~:i,i;~c_~t~-~ (;akWELL ~__J DRt' [] Other b. TYPE OF COMPLETION: NEW ~] ,,'on l( [----! DEEP- ~ PLUG ~] DIFF. [] ..~:L~ .~.~., ~_~ }:x n.~cK n~sva. OthPrerforated 2. NAM E OF OPERATOR Atlantic Richfield Co.mpan7 3. ADDB. ES8 OF OPERATOR ....... P.O. Box 360 Anchora. ge~ Alaska 99510 4. Loc'.,'ru>.x ov wrt, t, (Report locution clearly and in accordance with a~y State requiremet~ts)* At ~urface 1816'N & 24'W of SE cr Sec 2, T10N, R15R, UM At t,p prod. interval reported below 980'N & l102'W of SE cr Sec 36, TllN, R15E, tiM At total depth 1178'N & 1338' W of SE cr Sec 36, TllN, R15E, UM 1:{' D'[TE 5t'U 1 ;DED 114' 1)AT'E T'D' IiF*ACI-IED ! 15' DATE COMP(~ ~[~ (~BANI)'10-4-76 11-2- 76 11-9-76 ( 5-16-77) 1~. F~.VaTIO~S (DP, RKe.54,. ~'OTAL Dl~rt.~, MD & TVD~9. PLUG, B~CK MD & ~D~. ~How~L'C~LE~Y* CO~L., I 21. Single 1 ll,795'~9088'TVD [ ll,636'~,8975'TVp ~o~oo~ PRODUCING ~NXZHVAL(S), OF ~IS CO.MP~TIO~TO,P, BOSOM, NAME (MD AND Top Sadlerochit 11,354'~ 8772~TVD Base SadlerochSt 11,571~ 8916~TVD 5. API ND-iVIERICAL CODE 50-029-gn.?.~a_ 6. LEASE D~IGNA~ON AND SER~L NO. ADL 28324 7. IF INDIA.N, A~LLOTTEE OR TRIBE NAlVI.~ 8, UNIT,FAIllVi OR LF~kSE NAME Prudhoe Bay Unit 9. WELL NO, DS 9-8 (33-36-11-15) ~0. ~i~o ~u~ tOOL, OR wmol~,ldh0e Prudhoe Bay F~eld-0~] Pool 11. SEC., T., R., M., (BOTTOM HOI.~ OBJECTIVE) Sec 36, TllN, R15E, UM 12. P~RR2VIIT INTO. 76-70 ~T, GR, ETC)* ~ 17. ELEV. CASINGtlEAD INTERVALS DRILLED BY All I ' c^~.~ ~oo,.,s ,23. ~VAS DIRECTIONAL ! SURVEY MADE Yes 24. 'FYPI~; EL,E(.'Ti}IC AND OT[IER, LOGS RUN . 20" [94# IH-40 71' be.1. .. 12-~1g"... [72~-Butt ~ ~- 2713' - ~-578" [47#-Butt 11,227,' , ,[, &i S00-95, ,, , 26 LINE;{ 1 t00, 28. PERFORATIONS OPeN TO PRODUCTION (intcrval, size and number) pZL/BHC/,,,pR/SP,, FD_C/CNL/GR, GR/CNL/CCL CASING RECORD (Report all strings set in w~'~l) HOLE SIZE ,[, C'.F.~\~.~NTING RECOP~D £~,{C>UNT PULLED 30" [ 300 sx Arctic Set cmt 11,545'-11,557' 11,564'-11,569' w/4 shots per ft. PFIODUCTION 11,379'-11,395' 11418'-11,444' 11,460'-11,498' 11,507'-11,519' 11.529'-11.539' DATE F'II!.~jT ['£!:O£>UC.']FION [ PRODUCTION MEI[IOD (Flowing, F. a3 lift, pamping~size and type of pump) July 1977 "'-~ [ Flowing -a-77 13s° 0/ 4 ~L,~SW, TUilING' ]C~I. NG PRESSURE ]CALC~T~ OI~B~L. p,~ss. 1 [m-aou~ ~TE 1~1q I O_ I ~ _ 8044 [ 5866 31. tusPosnuox oF (;as (Sold, u~ed 7or fuel, vented, etc.) Roin~.~cte4 I 17-1./~" 4300 sx Arctic Set cmt 12-1/I" 10~0 SX C!ass G ,cmt' -7. TUBING REC OViD SCi-[EEN (AfD) J SIZE I DEPTH SE/' (MD) ~ PACKER SET (NID) .{ 5-1/2" ] i0,'g83'. ,, "~i i0,244:,,. , . .... ~ J } ~ . -;,~, . '"<wi?': O/ ' ,, ~VATER~BBL. I GAS-OIL IL~TIO [ . sss.4 I [ 729 W~--BBL. [OIL G~AVITY-~I (COR~.) [ 0 t 27.0 TEST WITNESSED BY 32. I,IST ()~ ATTACHMENTS 32. I heroby certify tj.ha~.,t, hefllqregolng and attached information is complete and correct as determined from all-available records / ~ .~ ( -- . '/ .. -- iii iii INSTRUCTIONS General: This form is designed for subr'nitt~ng a complete and correct welt completion report end log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- Tents given in ether spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separ,atc prc. duction from more than one interval zone (multiple completion), so state ~n item 20, and ir~ item 22 show the prcJucir~.g interval, or ir~terv,~ls, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produced, show- ing the ack. Jitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulcJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~l. (See instruction for items 20 and 22 above). ' 34. SUMMAItY OF' IvOI~MATION TES'I':q IN('I,UI)IN(; INTEFLVAL TE,qTED. I'}:~E~;--SU'~E DAT~ AND FLF_,COV£RIE$ OF OIL GAS. 35. G ]DOI_,OG 1C M A1R KER~ WATEJI AND MUD ,i, NAME Top Sadlerochit 11,354' 8772' Base Sadlerochit 11,571 ' 8916 ' ~B. cone DATA, Aqq'ACIi l~al~ A~O D~'r~CT~. s.ows or Ol~, G~S on ~v~. . J. A', ]k~chon/R, ran~m~} ~.~'cd ]~e. rc~-;ith are the £ollowing for the subject well' .un No. · . Scale' Xerox Sep.:ta ''BL Line I z eatm~n ~ Log Acid or Fracture "' ~ ~ · I'"" Bu'i]dup & Flow Profile Su~ey Bore]~ole Geometo~ Log Carbon Oxygen Log Casing Collar Log Cement Bond Log ' Compensated Neutron Log - Cased Hole Core Analysis - Interval Core No. Core Description (S~iC) - Interval Core Description (Cony.) - Core Directional Survgy- Gyro - Single Shot - ~k~ltishot -' ' l~t~gineerj.ng Production' Log Fluid Analysis .Fluid Density . Ga~utm I~a)' .. LocatJ. on Plat Monthly Well Test Data ' Mud } ~er~orat~n~ ~eco~d State Reservoir Pressure Report Surveillance Reports 'femperature Log ~. T',-a~sient Pressure ' Sm-veys 'fVD Logs - ~teI Induction I,~terolog - ComDensated Formation ~ensit~ LOg - ComDonsatcd Neutron-Formation Density Log - Boz'e]~o]c Compensated Sonic Log - Poz'osit~ Log :~cc_~l ~. Ackr~ow].cdged By [ease tLet:t~r~ JIccejpt '~'o' Ms. R. A. Logue Atlantic RichEield Company P. O. Box 360 Anchorage, Alaska 9951.0 North Alaska District Engineering T RAN S M I T TA L ' To' .. FrOm. .. ' "-] f°lloiving subject Transmitted hc. re~v..th are the for' the well' . Run No. ',.. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log -----Bt-lC Sonic/Caliper -- Gan'~aa Ray Log BHC Sonic/gamma' bl~y Log --~ Caliper/CCL Cement Bond I,og/VDL Compensa'ted Fo~ation Density Log Compensated Neutron-Fo~ation Density Compensated Neutron Log Core Analysis - Inte~al Core' No, Core Description (S~VC) - Inte~al Core Description (Cony.) - Core No. Direetional Su~ey - ~ro Single Shot ~'Mltishot Drill Stem ]'est. - Test No. ..... 'Dual Induction Laterolog Fo~na. tio~. ])ensity Log Formation Density Log/g~a Ray Gamma t~y/CCL Laterolog Location Plat .............. Microlaterolog ~icrolog ~udlog- Inte~al ....... Sa~uple Log (A.R. co~ - intemFdT Synergetic Log '1~1)--Dt L '~q)-Porosity Log .' Recc..t. pt Ackno_tfledged For' Please 'retu~ receSpt to' ~j~antic RichfS. eld Co~npany . North Alaska Engineering P. O. Box 360 7lnchorage, Alaska 99510 ,,.. ,antiCHluhfieldCompany I'lorth American Producing Division Alaska Reg Post Office ~ox 360 Anchorag. e, Alaska 99510 'relephone 907 277 5637 January 13,1978 Reference: Dear Gentleman: The ~llowing material is being submitted he~wit]l. Please acknowledge receipt by signing a copy of this letter and returning it to this office. Initial Transient Pressure Surve~ D.S. 9-1 Nov. 14/77 D.S. 9-2 Nov. 27/77 D.S. 9-3 Nov. 24/77 D.S. 9 5 Nov.21/77 D.S. 9-6 Nov. 18/77 D.S. 9-7 Dec.18/77 ~ .... D.S' ~ Dec.6/77 D.S. 9-9 D.ac. 10/77 D.S. 9-11 Dec.17/77 D.S. 9-12 Dec. 21/77 Initial Static Gradient Pressure. SuK,vey' D.S. 9-13 Nov.20/77 · D.S. 9-14 Nov.18/77 D.S. 9-16 Nov. 21/77 Very Truly Yours: X % Donovan Jackson (/ \ ' Nor. th Alaska Dist,,~ Engineering North A].aska D:i.$tricl; EnginccrS. n~.; T RA N S ~:'I I T T A L J. A. Rochon/I). R. Jackson ])at.e: June 24, 1.977 We].l Name: D.S. #9-8 Transm.i. tt'ted li. ercwJ, t]~ arc: the follow:i.ng for thc subject 'we].l: }bm No. Scale Xerox Sepia BL Line ................ luxd_Denslty_ B!'IC Sonic/Ca.l.iper Log Bt IC Sonic/Ca].iper - Gamma Ray. I,og BI-lC Sonic/Gamma Ray Log Ca].:lper/CCI, Cemen1: Bond I,og]VDL Compensa. ted Formal:ion I)ensJ. ty Log Compensated Neutron- Formation DenSity Compensated Neutron Log Core Analysis -lnterval Core No. Core ])escription (SWC) - Interval Core ])escriptS.on (Cony.) - Core No. l).l. rect:i.ona]. Survey Single Shot Drill. Stem Test - Test No. ])ual Induction LateroZog l':orma't, ion DensJ ty Log l::ornmtion Dens:i.ty I,og/dan~na Ray Camma Ray/CCL I,oc:a t:i. on Plat NS.crolaterolog Mud]og -- Interval Samf~].e I,og (A.R.C~-~--Interval Syn e'rget 5.c TVI).- ]I[ I, TVD-.l~orosity I,og tl _~ea. ._. ~] ea, Receipt Ac]mow].edgcd For' ]>].o~tse '~'OLUFD rece:ii)t' to'/-"'At~ant:i.d//-/'"/_ l~ichfi.eld Company ' '~~t.]t h-l.a.dm l'Mg~neer~r~g ~anaoe~ P. O. Box 560 Anchorage, Alaska 99510 #501 AtlanlicRichfieldCompany North American Producing Division NorthAlask 'istrict Post Office L ~,.x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1977 Mr. Hoyl e Hami 1 ton State of Alaska Department of Natural .Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 i ';; (_'iF (-.;L ' ' 3 GL:OL .... I ...... ~,:'v Subject' Dr~11 $:te 9-3 (31-11-10-15) Pe~m:t No, 76-3~ DRAFT ~:11 5:te 9-4 (13- 2-10-1~) Pexm:t ~o 76-40'---j--:':'~ ........ Drill Site 9-.5 (31 3-10-15) Permit No 76-47 Drill Site 9-6 (13- 1-10-15) Permit No. 76-48 (31- 2-10-15) Permit No. 76-58 (33-36-11-15) Permit No. 76-70 Dri~ (31- 2-10-15) Permit No. 76-76 Drill Site 9-10 (11- 6-10-16) Permit No. 76-82 Dear Sir' Enclosed please find our Sundry Notices of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb Enclosures Form 10-403 REV. 1-10-73 Submit ,il ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. O,L ~ GAS l--'! WELL I)~l~J WELL OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 1816' N & 24' W of SE Cr Sec. 2, T1ON, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-02g-20230 6. LEASE DESIGNATION AND SERIAL NO. ADL 28324 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudh0e Bay 9. WELL NO. Drill Site 9-8 (33-36-11-15) 10, FIELD AND POOL, OR WILDCAT D~.,,~II~ I~=,,,, 1: 4 ,~ '1,.,I - Prudhoe Oil Pool 1'1: ~'.~i';., !¥.~I~1., ~B~)"I-¥OM HOLE OBJECTIVE) Sec. 36, TllN, R15E, UM 12. PERMIT NO. 76-70 ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) Perforate (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Be,o. an perf operations @ ll30. hrs on 5/12/77. Tstd.tree, csg, tbg & wireline BOP's. Pulled dummy valve. Perf'd interva'ls 11,565'-11,570', 11,547'-11,559', 1.1,531'- 11,541',111,509'-11,521',, 11,481'-11,501', 11,463'-11,481', 11,420'-11,446', 11,381'- 1 397' w/4 shots per fi. Ran'Amerada'~ress bombs. Flowed well for 2 hrs. SI well. Ran & set ball valve @ 2211'. Tstd balance & control lines to 5000 psi OK. Bled press above ball valve to 0 psi, held OK. Installed & tstd tree cap to 5000 psi OK. Released well to Production Department @ 0600 hrs on 5/16/77. 16. I hereby certify that the foregoing is true and correct TITLE District Drilling Engineer DATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side /' ! 02-001B STATE of ALASKA Division of Oil ar~ Gas Conserv'-~on to: ~ FROM: DATE : ~l 26, 1977 ,SUBJECT: Witness ~ c~ ~gubsurface F~nf~ Valve and Surfaoe Control Safety Val~e for Aroo DS 9-8 _~ _Sunday,.. _~.~y 15,_ 1977 - Kirk %~%ite, supervisor for Arco, picked mm up at DS 9 whmre I ~ sta~ng and took me to Drill Site 9-8 ~_re I was to witness a subsurface safety valve and~ control safety valve. 12:10 t~4. ~en I arrived on location at DS 9-8, the S~.qV ~a~s set and ~he control lines w~re being tested to 5000 psi and held ~. Yhe SSSV was Tubing pressure was 1550 psi. The surface oontrol valve w~s closed and pressure of 1550 above SCSV was bled to 400 psi. There was no builda~ of prestone. I obse~a~d this for 10 minutes. 1:05 PM. The SCSI was _openmd and the SS~; was closed. The pressure of 1550 psi ~ F~qSV ~s bled to 500 psi. I observed this test fo~ 15 minutes. There was no buil~ of pressure, indicating that both tbs ~%~bsurfaoe safety valve and surface control safety valve did not leak. SSSV was set at 2211 feet. Tests finished at 2:40 PM. In_ ~: i witnessed tests on the surface o0~trol safety valve and subsurface c~trol m~fety valve for Arco on Drill Site 9-8. Tests were Attachnent ,, Perm i t NO. 0il 'and Gas Conservation Commit~~ Field~ Inspection Report , Well/Platfm ~ . Sec T '"i R , H RePresented by.j~iR/~'./~/W/;/,Ac, Name &' Number, ~;;~.~.-~' ~,~- -'.- ati sfactory ¥~es ~No ( () () () () (:) () :lOrn .' '6. SubsurfaCe~No. Wel'ls (). Wel:l Tes. t .Data 7. Well Nos. , · 8. Hrs. obser , 9. BS&W , , Satisfactory Type InSpection Yes 'N'O': I.'tem~( )BOPE'TeSt~'~, ( ) (~) -( )filled ( )' ( ) 1'7.. M~ster Hyd, (, I') (,,) () (') , () () , () ( ---- (),( 20. Dril 21. Kill ol - "outl ets Ch~'Ck Valve HCR valve N'o. valvs ' f'lgs 'hd'( )csg( )none !'" (), '( ) (~, ( 'eventer, psia ~:':'' (~')": '"(I " ~:??". ('+)' .( ) l',,.1. P&:A Marker. (':). '.' '( .Pi __ipsi.~ ~!:" ( ) ( ) 1'2. Water:well-( )capped.( )plugged ( ) (') 29..Kelly & Kelly-cock ': ( ) ( ) 1.3. C'lea.n,u.p.. ( ) ( ) 310'.. Lower K..elly val. ve !'.]:~i~ .... ( ) () 14.-...'..'."Pad~ 1.e~ie'l-ed t~..~ - (').. '(~...) 3.1.~ Safety ,Floor valves- ~V' :'~ ").Dart ~'::..;i.':' Toi:a-i inspection 0:bs.erV. ati'on 'i~i. me2:~[ ~r~//da~y..s.. TOtal n'.umber leaks and/or' eQUip., failures ~.~= :,~,:~.'~ .RemarkS "~.~. ~ ~ ~ ~ ~ ~'t.1 ~~ 7'' .' '. { 0'.~/% ~.BO) .. T~:~/~'~" ./;~$,/,. Z~~.' .' · · :?."... s~,..~..'~' ~.~.~. ~x.~;.~":-'"~.,'~:~..:.~ ~, ~' ~L- ~y- ' ' ~ . ' . .'. :;.'. _..::'."' ?:~:.~:~.'... . . .... . '.'.....~ ;.,...:..>.... :,:. ' . · ..~. -.. -. ~ .... :.. :. ........:. ..>....., : . .. .. .. .. . ,.: ..... ........ ...... , . ;..j~.' .. ..... ' C ; '~' :': ' "'--' " "' ' " ' '" ' ' ""' '"' '" ' ..... ':' ' .... ' " .... ' '"'"' .... " ,......'c. ~t~. ,~/~Z:~Not~fy ~n . . :~a~s......or..~hen. rea:dy:_.: ]= .Inspected. by. ~ ~/H.~'~ Da.te~/Z~/7.7." - DRILL SITE #9-8 PERFORATION AND CLEANUP RECORD May 13-15, 1977 D.S. #9-8 has a bottom hole location in the southeast' corner of Section 36, TllN, R15E, Prudhoe Bay Field. Depths of interest: Measured Depth Subsea Depth Zone Top of Sadlerochit Gas/Oil Contact Perforations (4 shots per ft.) Water/Oil Contact Base of Sadlerochit Junk Left in Hole 11302' 8681' Not Present 11379-11395' ' 8738-8751' LBS 11418-11444' 8770-8791' LBS 11460-11498' 8792-8823' LBS 11507-11519' 8829-8838' SMB 11529-11539' 8846-8854' SMB 11545-11557' 8859-8868' SMB 11564-11569' 8874-8878' SMB Not Present 11571' 8874' None RIH with first gun (select fire), tagged bottom at 11609', and ran CCL strip from 1].580'-1.0609'. Perforated 11564'-11569' and 11545'-11557' with choke open on 36/64" choke. Observed less than 100 BOPD from the 5' zone, but this leveled out at 500 BOPD 14 minutes after perforating the 12' zone. RIH with second gun (select fire) and perforated 11529'-11539' and 11507'-11519' M~ile flowing on 36/64" choke. The rate stabilized at 900 BOPD 5 minutes follow- ing the first 10' and then stabilized at 2000 BOPD 6 minutes after the 12' gun. Tubing pressure increased from 0 to 75 psi. Rill with third gun and perforated 11478'-11498' while flowing on 32/64" choke. Tubing pressure increased to 200 psi and flow'rate stabilized at 4800 BOPD in 6 minutes. Flowed well for 160 minutes to clean it up. Average flow rate was 3933 BOPD and final flowing tubing pressure and temperature were 1080 psi and 41°F. Bled do~m 9-5/8" casing periodically during the flow. RIH with Fluid Density log and discovered CaC12 water/oil contact at 11600' with emulsion present up to 11188'. ~e CCL run with the Fluid Density' log failed so we tagged bottom to establish depth after rurming the survey. Rltt with fourth gun and perforated 11460'-11478' while flowing on 44/64" choke. Observed no visible pressure response but there were no misfires. Rltt with fifth gun and perforated 11418'-11444' while flowing on 40/64" choke. Tubing pressure increased from 1000 to 1110 psi in 5 minutes. RIH with sixth gun and perforated 11379'-11395' while flowing on 40/64" choke. Tubing pressure increased from 1050 to 1150 psi in 5 minutes. D.S. #9-8 -~ Perforation and Cleanup Record Page 2 RIH with dual Amerada bombs making static stops near bottom. Flowed well for 90 minutes on 48/64" choke. Final flowing tubing pressure, temperature, and the average rate were 1280 psi, 41°F, and 7792 BOPD. SI well for 2 hour pressure buildup. Recovered Amerada bombs and determined that the pressure at 8800' ss was 4374 psi and the maximum drawdown while flowing was 373 psi, giving us a~ approximate Productivity Index of 20.9 STBD/psi. The maximum recorded tempera- ture was 195°F. The total volumes of oil and gas produced during the perforating operationsare estimated at 750 bbls. of oil and 563 MCF of gas. PDL 6/6/77 AtlanticRichfieldCompany North American Producing Division North AlasF istrict Post Office r:~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 24, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-1 (13-12-10-15) Permit No. 75-76 Drill Site 9-2 (31-12-10-15) Permit-No. 76-16 Drill Site 9-3 (31-II-10-15) Permit No. 76-35 Drill Site 9-4 (13- 2-1'0-15) Permit No. 76-40 Drill Site 9-5 (31- 3-10-15) Permit No. 76-47 Drill Site 9-6 (13- 1-10-15) Permit No. 76-48 Drill SiteS-Y (31- 2-10-15) Permit No. 76-58 ~-'F~!"~.~,~I ~]_8~ (33-36-11-15) Permit No. 76-70 Drill Site 9-9 (31- 2-10z15) Permit No. 76-76 Drill Site 9-10 (11- 6-10-16) Permit No. 76-82 / I c, ,~ ~q j'- ..... 5" ~,~,cf' I '~ ~:~ " .... J 3 ""-'xl SEC CONFER: FILE: Dear Si r: Enclosed please find a Sundry Notice outlining our plans for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure F ECE V ED N~AR ~ 9 1~77 Form 10-403 REV, 1-10-73 Submit "1 ntentlons" in Triplicate & "Subsequent Reports" in-Duplicate STATE OF ALASKA 0IL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OIL W[V~ GAS r'-'] WELL IZl~l WELL OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360 Anchorage, Alaska 99510 4. LOCATION OF WELL Atsurface 1816' N & 24' W of SE Cr Sec. 2, T 10 N, R 15 E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL (~ODE 50 029- 20230 6. LEASE DESIGNATION AND SERIAL NO. ADL 28324 ?. IF INDIAN, ALLOTTEE O}R TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudh,oe Bay 9. WELL NO. Drill Site 9-8 (33-36,11-15) 10. FIELD AND POOL, OR WILDCAT prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 36, T 11.N, R 15 E, UM 12. PERMIT NO. 76- 70 3ort, or-Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING g_.....J MULTIPLE COMPLETE ABANDON* CHANGE PLANS Perforate SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) ' (NOTE.' Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and glve pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate'selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, w_ill be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. kECEIVED Estimated start date: 17 JUNE 1977 N AR 2 9 ' S77 ,, Division of 0il and 6as Consen~tion 16. I hereby certify that the foregoing is true and correct SIGNED_. TITLE (This space for State office use) CONDITIONS OF APPROVAL, IF ANY,/'~ , .~...,,',.' DATE See Instructions On Reverse Side Approved Copy Returned · ATLANTIC RICHFIELD North Alaska DistriCt Engineering Date: March 24~ 1977 Well N~ne' Rochon/p. Hel~Istrom D.S. #9-8 Transmitted herewith are the follm~ing for the subject well' Run No. Scale' Xerox Sepia BL Line 1 1 1 1 BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log 5" BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log (GG) 5" Compensated Neutron-Formation Density(GR) 5" , , Compensated Neutron Log/Cased.Hole 5" Core Analysis - Interval _ Core No. Core Description (SWC) - Interval Core Description [Cony.) - Core No. Directional Survey- Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog _2" ~ 5'-~ Fomation Density Log Formation Density Log/Gamma Ray Gamma Ray/CCL 5" Laterolog ' Location Plat Microlaterolog .. Microlog Mudlog- InterVal S~nple Log (A.R.Co2) -Interval) Synerge tic Log TVD-DIL /VD-Porosity Log Receipt Acknowledged For' Date' · Please return receipt to' By' Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 em AtlanticRichfieldCompany North American Producing Division North Alas~ qstrict Post Office's'ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 27, 1976 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-8 Directional Surveys Dear Mr. Hamilton: Enclosed are new well surveys for Drill Site 9-8. Please disregard the previous survey. The north coordinate of the central point was in error by 16 feet. Si ncerely, Karl a Lenz Operations Aid AtlanticRichfieldCompany North American Producing Division North A=as' ;istrict Post Office ~× 360 Anchorage, Alaska 99510 Telephone 907 277 5637 November 10, 1976 Mr. Hoyl e Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 9-8 (33-36-11-15) Permit No. 76-70 Dear Sir' Enclosed please find the Completion Report along with the Drilling History and Multishot and Gyroscopic Directional Surveys for the above mentioned wells. Very truly yours, C. R. Knowles District Drilling Engineer /jw Enclosures SUBMIT IIX "'"~ ' ~' ~ E* STATE OF ALASKA , structions on reverse side~ OIL AND GAS CONSERVATION COMMITTEE i i i WELk COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE 0F W~LL; OlI,,VEl. I. ~ 'GAS,,.ELL ~ DRY ~ Other b. TYPE OF COMPLETION: NEW WE[.[ 2 NAM E OF uPERATOI[ Atlantic Richfield Company ,~. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4.LOc~'rn)x ut,' WrLL (Report location clearly and in accordance with any State requirements)* At surface 1816'~ & 24'~ of S[ cr Sec 2, 110~, R15[, OM ~t top prod. Interval reported below 980'~ & 1102'~ of S[ cr Sec 36, 111~, R15[, OM At total depth 1178'N & 1338'W of SE cr Sec 36, TllN, R15E, U~ ! /-IOW 1Vi2M~ Y* TOOL8 ll,795'MD,9088'TVDr-636'MD' 8975'1VD [Single I All PI~ODUCING !NTEHVAL(S), OF THIS CO,MPLETIO~N'~TO,P, BOTTOM, NAME (MD AND TV'D)* Top Sadlerochit 11,354'MD, 8772'TVD Base Sadlerochit 11,571'MD, 8916'TVD ORIGINAL -5. AP1 N~CAL CODE 50-029-20230 6. LEASE DF-.SIGNATIO1NI A~ND SERIAL NO. ADL 28324 7, IF INDIA.N, ALLOTTEE OR TRIBE NA1VIE 8. UNIT,FA.IL1V~ OR LE~ksE NA!'~IE Prudhoe Bay 9. W~LYNO DS 9-8 (33-36-11-15) I0.-. F-tELD A2qD POOL, OR WILDCA. T Prudhoe Bay - Sadlerochit sec., ~., ~., ~., (~O~TO~ ~o~ Pool OBJECTIVE) Sec 36, TllN, R15E, UM 12. PE1RAYIIT NO, 76-70 ( 54' RKB ., , INTER%'ALS DRILLED BY CABLE TOOLS 23.WAS DIRECTIONAL ~ SURVEY MADE Yes 2t. TYPE EL,FX'Ti:IC AND OTtI~ LOGS RUN DIL/BHC/GR/SP, FD¢/¢NL/GR, 6R/CNL/CCL CASING ~ECO~D (Report all strings set in well) 20" 94~ [ H-40 [ 71' 30" ~nn ~ A~ct~c Set cmt . 13-3/8 72f-Butt MN-80[2713' 17k" 14~nn sx Arctic Set cmt . 9-5/8" 47~-Butt MN-a0Ill:227) I lpg." ~1~ sv Class G cmt , ,m r m 8S00--gSl I ......... i iii ii i SIZb] TOP (2ID~ I5OTTOP,'I (~{D)SACKS CEMEXT* SCiiE~ (~5D) SIZE DEP~ SET (MD) ~ PACIfiER SET (}~D) [,790 n ~x 55" 10,833' ,917' 10,744' 28 PI'H~.F[)~ATtO'NS OP~N~ TO PRODUC~O~ (interval, size and nurnbe~} 29. ACID, Si~OT, D~IX~ INT~V.~ (MD) [ 2~MOUNC 2'~D I<IND OF ~,'ZATEYdAL US~ NA NA PIIODUCT1ON MEI[{OD (Flowi~g, g:as lift, pumping--size dnd t~petof P~mp~ .: [Vf~L S~'ATUS (Producing or AD,{OUNT PULLED D£:'I'E F'IIL~:I' [>I:ODUCTION DATE OF TEST, }i~UI{S qgST~ 'lend'rE SIZE ~P~OD'N FO~ ~)TV, 'I't'[;INr(;CA}~I. NG PRESSURE [CALC~T~ OI~EBL. OIL---IO~L. ,1 G-~MS--dVLC-F. < ::' - V~r~,%.TER--BBL.. GAS-OIL IL%.TI 0 fl" " ' ' ITEST WI'i'NES~ED BY .... 1 32. LIST ulc ATTACHMENTS Drillin9 History, ~ultishot & 6yrosco~ic Directional Surveys :';,q. I h.reby certify lhat the~ached information is complete and correct as determined from all-availablerecords SIGNEI, ~-~.~~ TITLE i Ill II II I I -- *(See Instructions and Spaces for Additional Data on Reverse Side) DATE INSTRUCTIONS General: This form is designed for submitting a complete and correct w, el[ completion report amd log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shovvnl for. depth measure- ments given in ether spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc prcduction fror'n more than one ~nterval zone (multiple completion), so state ~n item 20. and in ite,~ 22 show the prcJvc,r'.,g interval, or ~ntervals, top(s), bottom(s) and name (s) (if any) for only the intervJ! reported in iten~ 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produce, J, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ,,,, 34. SUMMAH.¥ ()F ["ORMATION TESTS INt'I. AJI)IN(; INq'!q.I{VAL T~qTED. PI~E~URE DATA ~ ~COVERI~ OF OIL GAS. 35. G~GIC MARK~ WATER AND MUD .. lop 5ad]evoch~t 1] ,354' 8772' Base Sadl erochit 11,571' 8916' iiiii i i ......... ii , i, irm', i ........................ 3fl. COIIE DATA, A'I'I'ACII I1RIEF D~CRI'P~ONS O~ LITIIOLOGY, POROSITY, FRAO~R'F~, APP~N~ DIPS AND I)E'I'E(~Ei) SIIOWS OF OIL, G~S OR %VAq~I. [ i il i i i i mi il i , h , ,1' 1 i r]l": rfl i i'm ' DRILLING HISTORY ~'~ '' DS 9-8 (33-36-11-15) API 50-029-20230, ADL 28324, Permit No. 76-70 Spudded well @ 0600 hrs 10-4-76. Drld 17½" hole to 2750' Circ & cond hole for csg. POH. RU & ran 13-3/8" 72# MN-80 Butt csg ~/shoe @ 2713', FC @ 2632'. Stabbed into FC & cmtd w/4300 sx Arcticset cmt, slurry 15.2 ppg, preceded cmt w/60 bbls wtr wash. Displ w/345 bbls mud. Final press 1000 psi. Bled off, floats held. POH w/cmtg string. ND 20" BOP. Installed & press tstd 13-3/8" pkoff asbly. NU BOPE & tstd same. Press tstd choke manifold. Press tstd csg to 1500 psi. Drld FC @ 2632', 13-3/8" csg shoe @ 2713' & 10' of new form to 2760'. Press tstd form to 0.65 gradient OK & drld to 2800'. Trip, PU Turbo. RIH & orient tools, drld 12¼" hole 5728' Directionally drld 12¼" hole to 11,251'. POH. Ran DIL/SP log. RIH. Co~d mud. Trip out, chgd & press tstd rams. Ran 284 jts 9-5/8" 47# MN-80 & S00-95 w/shoe @ 11,227', FC @ 11,136', FO's @ 2465', 2342'. Cmtd csg w/lO00 sx Class G cmt, mixed w/0.75% D65 & 0.2% D13R, slurry wt 15.8 ppg. Displ w/813 bbls mud. Bumped plug w/3000 psi. Installed & press tstd OCT 9-5/8" csg pkoff to 5000 psi OK. RIH w/RTTS & shifting tool, opened upper FO @ 2342' & circ 9-5/8" x 13-3/8" anul. Closed & press tstd FO to 3000 psi OK. Opened lower FO @ 2465', circ annulus. Shut in anul and pumped thru FO @ 4 BPM. Pumped 200 bbls H~O wash ahead of cmt. Cmtd thru lower FO @ 2465' w/300 sx Arcticset cmt, ~ixed w/0.2% D13R & 0.2% D59, slurry 16.0 ppg. Displ w/24 bbls mud. Closed FO @ 2342 & press tstd to 3000 psi. Opened upper FO @ 2342' Circ 300 bbls mud. Closed & press tstd FO. Reopened FO. Pumped 50~ bbls wtr wash followed by 45 bbls prepack & 181 bbls gelled pack. Break thru @ 162 bbls after pumping 260 bbls. Discovered 4" return line frozen. Switched to mud pits & pumped additional 50 bbls ~-'~' Arctic Pack. Last 50 bbls returns 1% contamination. Closed & press tstd FO. PU 8½" bit. RIH & check FC @ 11,136'. Press tstd csg to 3000 psi. Drld FC, firm cmt & float shoe @ 11,227'. Drld 10' new form to 11,261'. Press tstd form w/ll.3 ppg equiv mud wt. Trip, PU BHA & drld 8½" hole to 11,795'. Ran DIL/BHC/GR/SP, FDC/CNL/GR logs. Trip in & cond hole for lnr. Ran 7" MN-80 butt lnr w/shoe @ 11,790', top of lnr @ 10,917'. Cmtd lnr w/300 sx Class G cmt mixed w/0.35% D13R & 0.75% D65, slurry wt 15.8. Preceded cmt w/50 bbls wtr wash. Displ w/209 bbls. Bumped plug w/3000 psi. RIH w/8½" bit & csg scraper. Tag cmt @ 10,827'. Drld final cmt to top of lnr @ 10,917'. RIH w/6" bit. Drld cmt 11,574' - 11,636' Press tstd 9- 5/8" csg & lnr lap 3000 psi. Meas out of hole. Make up D~T tools. RIH w/6663' wtr cushion. Set pkr 10,860' & opened hydra spring tstr @ 0517 on 11-3-76 w/weak blow for 5 min then dead balance of one hr tst. Shut in @ 0617 hrs for 1 hr shutin tst. Fin WSO tst. POH. Net rise 15'. Charts indicated tst OK. Ran GR/CCL & Gyro. Chgd over from mud to CaC12 wtr. POH. LD DP. Ran wireline junk basket & gauge ring to 10,700'. vress tstd csg to 3000 psi OK. Ran 5½" 17# MN-80 tbg w/ 4 jts 4½" 12.6# Butt tbg w/ shear sub @ 10,883', SAB pkr @ 10,744, PBR @ 10,648', XA sleeve @ 10,654', RQ i~]~]~_@ 2212'. Landed & press tstd tbg hgr to 5000 psi OK. Pumped 4 6bls diesel--down tbg. ND BOPE. Installed & press tstd tbg hgr to 5000 psi OK. Pumped 4 bbls diesel down tbg. ND BOPE. Installed & press tstd xmas tree to 5000 psi. Press up & set Baker pkr. Sheared pump out sub. RIH & open sliding sleeve. Displ tbg w/diesel. Closed & press tstd sliding sleeve Ran GR/CNL/CCL log. Set & press tstd dummy valve. Hooked up for long term press tst. Released rig @ 0400 hrs 11-9-76. A PETROLANE COMPAIVY REPORT of DI[~C T#OAI~ L ~U~VEY Atlantic Richfield COMPANY D. S. 9-8 WELL NAME Prudhoe LOCATION JOB NUMBER Al176 G0216 TYPE OF SURVEY Gyro DATE 12-8-76 SURVEY BY Shyam Talwar OFFICE Alaska NOVEMBER 8~ 1976 ATLANTIC RICHFIELD CO, DRILL SITE 9-8 JOB Al176G0216 -GYROSCOP'-I-C' SU4VEY .... _O<t/_'_ .......................... K,B. ELEV, 5~__F_T, RADIUS OF._CURVA~.UR~_NE?_HOD.?F._COM~UTAT_IONS.~i ..QONPUTED FOR .... EAST_NAN WHIPSTOCK.. INC, BY F, N, LINDSEY .AND ASSOCIATES RECORD OF SURVEY ALL CALCULA1;-I-6-iq-S-P-Ef~'FoRrqED BY 'I- B N. E-C.-~YR-O-N-i-~--'~-~'Pc~-TER '-~-~'; D~I-~'~' "~'ERT'IC~ - SuB "~R'I-F'~ ............. ~O'~-~"--~'~'I~E~ ................. ~'"~---'0-'~-"U~'R .... ~ ..... ~ ........... SEVERITY .............. ~-~'C~ DEP T'H'-'"AN~LE ...... DEPTH ............ SEA ......... D'I REC .................................. EI-S~A~CE '-' AN~L[ .............. DEGI ZOOF'~ ........... D'I'~"~NC E D H DEG, D N S 0 ........... 0._ 0 .................... 0,00 .......-Sb,O0 ._N58,00E 1763,00 N ............... 649,00 E__ 1878,66 N 20 ~2 35 E .... 0,000 ....... 1808,51 ....... "~00 ....... 0 ........... 0 ............. !00,00 ..........46,00 .N58,00E ........ !76~,00 .... N ........ 649,00_ E .........2878.,66 N 20 22 35 E 0.000 ............. 1808,5~ ......... 300 ....... 0 ......... 0 ............. 300.,00 ............ 246,00 N58,00.E ....... !763,00___N ..... 6~9,00 .....E .... Z878,66 N 20 12 35 E ......0,000 ..... ~808,5~ ............ ...... ~00 .......... 0 ..... 10 ............... 399,9.9 ........... 3~5,99 ....... N58,00E ...... 2763.,0? N ................ 649,12__E .........~8.7.8,7_7...N...20 ..... ~2 ..... 45 E ........... 0,270 .................. 280..8.,6..5 ............. ...... 900 ....... 0 ...... 15 .......... 8.9.~,.99 ....... 8~5,99 ......$29,00E ........... !?.62_,3¢ N ......... 650,65. E ..... 1878_,62__N__.20..~5 51E .... 0,07~ ............... 1808,96 ..... ~000 0 .... 0 ........ 999,99 945,99 S29,00E 1762,15 N 650.76 E 1878,~7 N 20 ~6 9 E 0,250 ~808,86 ..... .zoo 0 0 z0¢¢.9¢ s 9.00s z? z.z ............... ....... '"0.000 l~O0 0 ~5 ......... ~.29_9_,99 ...... 1245,99 S12,00W .......17.61,94 N ........ 650,79 .... E ........... 187.8..29 .... N. 20 .... 16 ..... 20..E ......... 0,250 ...........~.808,7~ !~00 0 40 1399,99 !3~5,99 S31,OOW 1761,20 N 650.50 E !877.49 N 20 16 18 E 0.420 1807.9~ 1500 0 ..... 25 .......... !4.99.,_9.8 ........ 1445,98 .......SIO. OOE ......... 1760e27 N .....650..~3.3 E ............ 1.876.56~N.2.0_16___36 E 0e240 ......................... 1.8.07.09 ~600 0. 30 ....... !599_,98 __!545,98 ....... SI.8,00E ........... 17.59,48_._N ..... 650,52 ....... E .......... ~.8~5,89 N..20.17 .... 26_.E ........... 0..,070 .................... ~8.06,57 .... 1!00 0__3.0.~.69~_,_93~645...,97 .... S26,00E .... 17.5.8-6.8 ....... N ........... 650..,.8.5 ...... 5 ............ 187.5,25 ..... N......20 ...... ~8 ..... 30 ...... E ............... 0.,0.7~0 ....... ...... !800 .... 0._30 ....1_.799_,97 ..... 1745,97 ..... S21,OOE ........... 1757.,88 N ...... 851,20 ....... E .............. 187.A.,62. N. 20 19 ~7.. E ......... 0,0~ .......................... 1805,66 1900 O_ 30 ....... 1_8.97,.97 ........ !8&5,97 ..... S .5,00.E .....175.7_,03 N ............. 65~.,_3..9_E .....1813.,8.9 ..... N..20 ..... 20..29 ..... E ................ 0..!.3.9 ............ 1805,09 .._2000 ...... 1 ....... 0 ........ ~99.9.,_96 ..... 1.9~5.96 ....... S21..,O_OE ........... 1~75.5,76 .... N ................ 651_,69 ...... E ...... 1872,80 N 20 ..... 21 48.._5 .................. 0,50~ ................ 1804,23 2100 . 0 ....~.5 ............ 2.099_,95 .....2045,95 .... $25,00E .......... 1754,35..~N ..... 652,.2.8 ..... E ........... 1871,69 N 20 23 ~4 E ...... 0,250 ...................... ~803,44 .... 2200 0.. 35 .......... 2199.,9~ ......... 2145,94 S37,00E .......... 1753,35_N ......... 652,88 .... E ........... 1870.96 N 20 25 24 E ......... 0,160 __2300 ...... 0 .... 45__2.%9.9_,.?.3 ...... 22.45.,93 .....S58,00E ............ ~.7.52~,.57 ...... N .............. 65.3..,..~4_E ............. !870..53 ....N 20 27 23. E ...................... 0..,I.60 ....................... !802,85 .... 2~00 0. 30 .......23.9..9.,..99 ........ 23~5,93 S89,00E ....... 1.752,26 ....N .......... 654,78 E ........ 1870,60 N 20 29 22 E ......... 0,250 ............. ~803,21 RECOR6 O'i SU V _Y PERFORMED BY .... I B ELECTR-ON"i-- -- -O- 'PUT R .NIEA$. _DRIFT VERTICAL ............ SUB DR1~FT ...... TOTAL COORDINATES ........... _OEP.TH ANGLE _ .DEPTH ............... SEA DIREC ................... DISTANCE ANGLE ..DEG/IOOFT ................. D ..~l .............. DEG. ..... 2700 1 ..0 ..... 2699_,.9]. ..... 2645,91 N32,00E .... 1753,7~. .... 2800 ! .!5 ....... 2799,89_ 274.5.89 N30,OOE ..... 1755,4.3 _.2900 .........5 ..0__2.897~,~.2 ...... 2845,72 ...... N27,OOE ......... 1750,22 ..... DO00 9 ...... 0___299.8_,.96 ...... 294.4,96 .... N30,OOE ........ 1770,92 ..... _3100 _..1_2 /+5 ...... D097._,1~. ........3043.14 .... N37.50E ...1786.60 3200 14 0 _3.1_9.~a_,.~.3_ _3_140.fl3 ...... NBg,00E ..... !804,76 3300 15 0 3291.24 3237.24 N39,00E 1824.22 3400 16 30 3387,48 3333,48 N37,00E !845,61 657.61 ~ .......... 1872,99 N 20 33 17 E 0,330 ............. 1806,u8 658,62_.E ........ 1874,92 N 20 33. 57 E '0,250 ....... 1808,03 661.22 E 1880,31 N 20 35 19 E 3,750 1813,44 667.04 E 1892.38 N 20 38 22 E 4.90! !825.52 677.51E 1910.75 N 20 46 3 E 3.768 1844,35 691,83 E 1932.82 N 20 58 25 E !.253 1867.46 707.59 E !95&,65 N 21 12 2 E 1.000 1892.47 724.30 E !982,64 N 21 25 38 E 1.509 1919,59 3500 17 20 3483,15 3429,15 N35,00E 1869.15 N 741,40 E 2010.82 N 21 38 9 E 0,859 1948,69 3600 19 30 3578.03 3524.03 N32.00E 1895.50 N 758.84 E 204!.75 N 21 49 5 E 2.!86 1980.26 3700 23 50 3670.94 3616.94 N29.50E 1927,22 N 777,71 E 2078.23 N 21 58 34 E 4.359 2017.02 -3800 26 .... 0 ........ 3761~"62 ........ 3707.62 ....... N30,OOE .... 1963e80 N ....... 798.62 .... 5 ............ 2!19.98 N 22' 7 48'E .......... 2',!62 .................. 2058,91 --3900 .... 28-15---'-3-85b-.%"1---3796.41 ~N29.00E....... 2003.81 ..... N ......... 821.26-E---2'165,58 N-22 .......... 17 ..... 10 .... E ................ 2""760 2104,60 ~000 31 30 3936.90 3882,90 ........... N29,00E ............ 20~7,71"N ......... 845.59 .... E ........ ~"'2'215,~3 N22'26 16 E ................. 2,750 ................. ~100 34 0 4021.00 3967,00 NBO.OOE 2094.79 N 872.23 E 2269,!2 N 22 36 21''E ................... 2.519 2208.17 ._. 4200 36..5.0 ......... ~.~0_2..?.48 .......... 4048.48 ........ N30,50E 2144.85 N 901-.-42 E -23'26'.'57 .... N'"22 ....... 47 44 E 2,846 4300 39 45 &180,95 4126.95 N31,OOE ....... 2198,!0"N ............. 933"",~1'~'~E .......... 2"387,95 N 23 0 ..... 5 .... E ............ 2,91-7 .......... 2327~.~ .................................. , ................... ~400 ~2 0 4256.56 ~202.56 N32,00E 2253,89 N 967.29 E 2452,69 N 23 13 38 E 2,294 ............................ 2'392,79 --4 500-44-~0 ....... 432'9'-,-49 ..... 4275.49 ......... N32,00E 2"31"i',91 N .... ~'003','-55-'"E'---2520,32- N 23 '27 5"2 ........ E ................ 2'340-- 4600 ~6 35 4399.62 a345,62 N3~,50E 2372,52 N 1041.0'5 ..... E ......... 2590,88 N 23 41 30"'E ................ 2,265 .................... 2532,13 .... 4700 48 30 4467.12 ~413,!2 N3!,OOE 2435,59 N 1079,33 E 2664,03 N 23 54 1E 1,930 2605,67 4800--52 .........5 &"530~-99 4-476'-99 ....... N31'.'OOE .... 2'50i-,'53 .....N~-1!i¢,-9'~-'~ 2'74'0,38 N'~24"'5 ..... 57 .... E 3","59'0 268'2,30 .... 4900 5~ '30 ........ 4590.76 ....... ~536.76 N31.50E ......... 2570,06 .... N ..... 1160,53 .... ~ ......... 2819,94 N 24 18 7-'5 .................... 2,433 .......................... 2"762,21 __.5000_..54 .........5 ....4649_..12 ...... &595,!2 ......... N32,00E 2639.!1 ...... N .......... I'203'-,~26 -E ......... 2900'48 N 24 30 35 E 0,525 ..................... 2843,19 5100 54_30 4707.48 .......... 4653.48 .... N32.50E---2707','"79'--N .... !2'46'~-59-'E----2980,96 N 24 43 .... !2 ...... E ............... 0,527 2924,23 5200 54 40 4765,43 4711.43 N33.00E ..... 2776*33 ..... N .... 1-29'0'-'""68 ..... E-- .....3061'68 N 24 55 59' E ............. 0'374 ...................... 3005,60 ........ . ........................................... -A- .- -'C - U -ATIoNS"-DERFORMED BY I B M E CTRONI-C ...... COMPUTER MEAS. DRIFT VERTICAL SUB DRIFT TOT-X"[--~'O'--O--~-~'-i~-~I'~-E-s ......... C [-'-0''S U R E S SEVERITY SECTION _OEP~T.H ~ ANGLE .... DEP_T_H .............. SEA ......... DIREC DISTANCE ANGLE DEG/IOOFT DISTANCE D H DEG. D M S __5500__55 ..... 0 .... 4..937_._94 4883,94 N42,00E 2978,78 ..... 5600 52 1.0 4997....2.9 ...... 4943,29 N39,00E 3039,96 ..... 57.005.2 ...... 0 ..... 505.8.,.74 ...... 5004,74 ...... N~O,50E ........ 3100,62 5800 51 0 5120,99 5066,99 N41,50E 3159,68 ....... 5900 51 ..... !5 ...... 5!83..._76 ...... 5 29,76 .... N4!,OOE ..... 3218,2t .... 6000 .... 5! 10 ....... 524.6,.~0 ........... 5192,40 ........ N41,00E .......3277,04 __6.10.0_5}_20___5.~.0..8_,.~9 ...... 5254..,.99 ....... N.4!.,.50E ..... 3335,68 ...... ...... 6200 5~ 30 ...... 53.7!,35 ........ 5317,35 .... :.N~2,00E ......339~,00 223,80 N 25 !9 42 E 0,409 3168o91 303,80 N'25 .... 37 ...... 39 E .............. 6,039 325~ .8 381,62 N 25 58 39 E 3,393 3330,88 ~58,30 N 26 17 19 E ~' 0,947 3409,59 53 ..o4 ...... N 609,42 N 26 55 ...... 2_3 .... E ............... 0,.39.4 3565,06 ......... 685,07 N 760.,79 836,6~ N 27 47 35 E 0,346 3798,12 6300 51 35 5433.54 5379,54 N42,OOE 3452,19 N 1841,3~+ E 3912,57 N 28 z+ 29 E 0.090 3875,99 6z+ 0 O .... 51_~ 0__.%4_9.5)_6.~ ..... 5~.1.., &.~..__N.4 ~., 50 E 35.!0.., 69 ..... N.___!8 9D,.55 ..... E ............. D988~'_79.~.,'j~ N'"'~28.~20 .... 27 ..... E ............. 0',"318 .......... 39 '~6500 .... 51 .... 30 ....... 5,_~5._7_,_75 5503,7,5 .......... N~I,OOE 3569.59 .....N ....... 1945.21 E ..........~065.,.20 ..... N 28 ..... 35 ..... 15 E ............. 0.3.50 ............ ~032,00~:~ 6600 51 ...... 55 ...... 5.6.!_9_,.?_! ....... 5565_,?.1 ....... N4!,OOE 3628,83 N 1996,71 E 1+141,89 N 28 49 ...... 15 ..... E............... 0e43.0 ...................... ~.110,18 .... 6700_.52 ........ 0 56.8..!_~2 ......... 6800 51 50 57~3,00 568g,00 ....... 6g00..51 .... 55 ......... 580.4..,_72 ..... 575.0.,.72 ........ N41, __7.000._5.~_.20.___59.6.6.,~..10___58.12_,..1.0 .... 7.100 52 .......... 0 ........ 57.27_,,43 ........ 58.73,,43 ....... N41, 7200 .... 52 ........... 0 ........ 5989.00 ........ 5935,00 50E ....... 3688i?05__..N .... 2048.,64_E._] ........ ~2!8.,85 .... N_.29 .......... 3 ....... 4 E .... .__0..,.3.18 ............ OOE .......... 374.7,23 ...... N ........... 2100,54._.E ........~29.5,82 ...... N.._29_16 23 E ............0)3.48 .................... 4266,98 .... 505 .......... 38.06..,39 ....... N ......... 2152.,42 E .......... 4372..81 ...... N ..... 2.9 ...... 2.9 13 .... E ........ 0.,.323 ............ 4345,3~ OOE 3.$6.5..t28 ..... N ....... 2204,_98 E .........~.49,.99 ....N._...29 42 10 E 0,5~6__~23.,85__; OOE ......... 392~,~4 N 225?.32 .... E .............. 452~,.35 ..... N.29 .... 5.4 .... 26 E ....................... 0,?.08 ............. 450~. 6 OOE .......... 3983,9!.N ....... 2309,02 .... E .............. 4604,68 .... N_.30 ......... 5 ....... 45 E .................... 0,0.0.0 ................... 4580,95 _7~00 ...... 5.1_20 ....... 6.~..13....36 ..... 6059,.36 ........... N4.!,OOE ....... 4102,12.. N ..... 2411.78 ....... E ............ 4.758,58 N.._.30 2.7 ......... 9 .... E ............ 0..,..090 ........ 4736_,96 ~500 5.! ........... 0 ......... 6.!~.6,06 .....6122,05 N42,00E ..... 4160.,~6 ....N ......... 2463_,3.9 E ............... 4835,.06 ..... N..._30 .... 3?._.46 .... ~ ........ 0...~693 ............ .__~600_5.0_~_5 ..... 6.2~..9..,~,i8___6.!.85...,_3.8 ........... N4.3..,..OOE 42!.7,.53 .... N ...... 251.5_.,68 .... E .... __~9).0...8,3 .... N..._3.0._~8_.55 ....... E ......0.,_8.23 ........... 4891,38..__ 7700 ....... 50 ..... ~0_~.Q3._,_26__6249.,26 ....... N43,50E .......427.3.,.57 ...... N ........ 2568.,_~0 E ........4985,99 N...31 ........ 0 ..... 20 .... E ................. 0..,.3..93 .................. ~96.7,69 7800..79...~_40 ..... ,6367.,.64 ..... 6.3.!3,64 ....... N41,5.0E ........... ~32.9,98 ..... N 2620.,.09 .... E ............ 5060,99 .....N_3~ ....... ZO .... ~2 .... E .................... !,265 ..................... _2~.00_4.9._3.0 ~_3.2..,..4.~ 6.37.~._,.~8 ....... N~l.,OOE.~43..8.~,.22 N ....... 26.70.,.29__E ....... 5.~35,97 ...... N.._....3~ .... ~9 .... 36 .... E ........ 0,3.35 ............. ___8.0..00__~.8 ~.5_~6~9_8_,._.0.2 ...... 6..~.~4..,.02 ......... N41,00E ....... ,~>~A'22._.~ .... 27!9..~8~ ..... E ....... 5210,_4.3 N...._3!,._2~ .... 5.9 E ............ 0.,9~0 ..................... ..... 8!00._4.8 ......... 5 .... 65.6.A.,.49 ......... 6510,4.9 ......... N41,OOE .......4.500,6.0 ..... N ..... 2768.,..8.5 E ....... 528~.,12 N..3!_36 2 E 0,500 ............................ 5269.,14 ALL C A L C U L A. TRuE ............................................................................................................................................................. DO'G-L-E-G _,.~EA_$.._.D'R-fFT.-~.V-E-RTI'cA"E~ ...... .............. TO_~AL___COORD I NAT.ES_._.:. ....... C L 0 $_._...U. R E S ........... SEV~.RI._Ty~_SECT ION ~_E_~_~..~.._._A N G L E ........ DEPTH SEA ........DIREC DI.STANCE ......... ANGLE .......... D E_~ ~__~.~.~_F_T ................ DISTANCE D,_ N DEG. ...... ~85.00__z+9.._z+O ...... 6827.47 .......6773,47 ...... Nz+2.00E ........ 4725,.86~.N ...... 2969.05._E ........... 5581.13._.N...32 ...... 8__21 .... E ........ 0,381 ................. 5569,uz.. ~8.600 ....5.0 .... 15 ....... 6891,80 ...... 6837.80 ...... N4.2.00E ....... 4782_..75 N ........ 3020..28_E ........ 5656.,.57 ..... N._32 .... 16__.19 E .......... 0..580 ................... 5645.1~ ~_79.~.51 0 6955.24 69.01i%..2.~- ...... N42..50E 4839,97 N 3072.25 E 5732,72 N 32 2~ 21 E~0,809 5721,97 __8800_52_10 ........ 7017..38 ....... 6963,38 .......N~2,50E ...... 489.7..74_._.N ........ 3125.18 .... E ......... 5809,.88 ....N.__32_32 .... 29 E 1,170 5799.80 .~890.0_5~ .... 30 ....... 7079,.~? 7025,.~? ........ Nb2,00E .......... 4.95~,94 N_: .... 3~78,05 E ............. 5887.39 .... N_32_.~0_..~3 E ..... 0._,.73.~ ........... 5877.9~ .... 9000 50 50.~.7~.~1.,...~7 ..... 7O8_7_,_87__N~a.~50E ....... 5.0..1.3.,..60_..N_~3230...43 ..... E .... 5964_,..22_N_32~7 .... 42 E__0.725~5955.37 '" ~..1..0~ 50 ....30 ......... 7205,25 .......715.1,25 ....... Nb2.00E ...... 507.0,86 ....N ......... 3282,43 .... E .......... 60~0.53 ...... N._3~ .... 5~ ..... 55_.E____0....452 5032,25.. ~920.0 ..... 50 ..... 5 ...... 7269.13 ...... 7215.,13 ......Nb~.OOE ...... 5~28j.48._N ........ 3333.b~ E ............. 61.~6.,6~ .... N.._...33 ......... Z .... 23 E ...... 0__~?.~7 ............. 6~08,82 ~_Op~.O 0 ........ 7.~.3.3...._3.5~..2.79.~,_3_5 ..... N 4!70 OE __. 5~1.8~.73_3_N 3 38 3..,..70 E .... 7 .... 17_5 __0. Q9 0 ~ ~ S 5 · 17 ........ ~._b.O.O__4 9_10 ....... 739 8. ~ 8 ......... 73 ~4., 18 ........ N42.50E ...... 52~3.. ~ 3 ..... N ......... 343 ~ .40 E ........... 6267.8.2 N._.33 ..... ~ 3 3 3 ...... E ....... 1.~..~9~ ............. 6250 · 9 % 9500 ~8 ~0 7463.89 7409.89 N42.00E 5298.93 N 3485.08 E 6342.27 N 33 19 57 E 0,57~ 6335.83 ~6"0'0'-'~"8 0 .......... 7530.37 7~76.37 ...... N43.50E ........ 5353,78 N 3535,79 E 6415,98 N 33 25 30 E 1.065 6410.00 9700 47 30 7597""60 7543.60 NbB.OOE 5407.70 N 3586.51 E 6688.93 N 33 33 11 E 0"'5-69 6483.41 ~980'0-4'7 .......5 ........... 7665.43 ..... 7611"-~'3 ....... N~ 3 ' 50'E ........ 546i ' 22 .... N ....... 3636 .-86 E ............. 65'61"' 38 N-33 ..... 39 ....... ~0 E ............... 0","~90 .................... 6556.30 .... 9.9_0.0_4~ .... 25_~.73~.29.__7679....29 ...... N4~,..0.0~5_5!~..._27 N 3687.64 E 6633.70 N 33 ~6 20 E 0.435 6629,06 10000 ~7 20 7801.00 7747e00 N45.00E 5566.76 N 3739.22 E 6706.02 N 33 53 22 E 0.5~8 6701~ ' -f0100-4'7 ........ 0 ...... 7868','98 ...... 781~,98 .......N45.005 ........ 5618"62 .... N ........ 3791,08 E ........ 8777'99 N-'34 ...... 0 ..... 32 ....... E ........... 0'~-340 ~j.)_20.O_.A.~?5 7.9.3.~..,..3~ .... 788.3_._3~ ........ N4.5,.OOE 56.77...23_N__3842,69 E ......... 68'49'66 N 3~ 7 3i E ................. 0'250 ................. 68~6.31 ...... 10300 46 20 8006.12 7952.12 N45.005 5721,56 N 389~'.02-'E ........... 692'0.9'6 .... N-3'4-"1~-19 E 0,410-- 6917.99 -I0'4'00-45 ......... i5 .... 8075,-84' ........... 802'1".'84 ...... N44',OOE ....... 57-72"'-'6'9"~N ....... 39~' 26-5 ......... 6991'''51 .... N"-3~"-20 ..... 36 E .............. 1"'~'20'i .......... 6988.87 -10 500 ..... ~5 ...... 0 ........ 8"1-~'6""40 ........ 8092'~0 ...... N44,50E ............. 5823,~5 .....N ....... 399'3.71 E 7061'32 ...... N'-'34 ..... 26 32 E ............ 0'"35'4 ........... 7058,99 A%%~"0--~'3--55- 82'"1-7-;'~'7 8'1'6"3~'77 ........ N4'5','OO'E---5~8"7'13'~'-l'"9--N .... 40'43"03 E 7130.25 N 34 32 34 5--1.097 '7128'20 %"~O'O0'"'-'~'Z ....... 3'0 .......... 85'11-"'3'0 ......... 8~57';30 ........ N~6"50E .... 6062,99 ....... N ~23'7'"~1 ......... E ..... 7'3'96*-99 ..... N-'3~5'6 ....5'8 E 0,61'5 7395.9~'-' -I1-I-00~-2 .... 0 ...... 8'58'5-'-'9'0 ....... 85'3"f"90 ........... N~8, OOE ........... 6i 0'8';-~9'-N ..... ~286-,-3i-E ....... ......... 3 ...... 30'-'E 0,837', ....... 746 3 NEAS, DR_!~T__.VERT._I_CAL .......... SUB ....... DRIFT TOTAL COORDINATES .............. C_ L.__O.$.U R_ E 5 ..............SEVERI_TY. ............. SECT.ION . ._DEP TH._.ANG~E_ ........ DEPTH ...........SEA ...... DIREC .D__I..S.T_AN C E ...... ANGLE ....... DEG/!OOFT ............. D M DEG, D M S _13,2.00 z~ ! 55 .... 8.6.60_, 2_6_ .... 8_606.26 ........ N4.8. O..OE ........ 6152.93. N .......433.6...00 E ........ 7_52_7..~_5_.. N__3 510 21 E ......... 0...,079 ............. 752 6. 61 11300 z+3 z~O 8733,63 8679.63 N~+R,DOE 6!98,17 N ~+386.69 E 7593.44 N 35 l? 18 E 1,756 7592,~ ~_~ . ,, - .... ) 1.l/+O0 /~/+ 3.0 ........ 8805_,l+6 8751,/+6 N/+9,00E 62/+4,01+ N /+435_.99 E .......... 7.66_1_,!.2 N 35__2/+ 31+ ~E ........ 0,8.66 7660.oZ .... !1..5 o0..4~_. ~_o ~.87_6,.9.8 .... 882 2.9 8 ..... N~.9,,.O_OE ......... 6 ..~.1.6oo ...... ~ 5~ ....... a..gAs..._e.6 ...... 8.s.~.. ~ ...... N ~O....OOE ....... ~ 11615 44 0 8959,65 8905.65 NSI.OOE 6 11636 44 15 8974.73 8920.73 NSZ.OOE 6 _~_1..7..9.5_4.5 .... 0~9_0_~!.,.8_9 90 3_3.. ,.89 -- N 5_1,..0.0.~ ..... 6 28 9.89 N ...... 449.1.._7~ ..... ~ ....... '/.7.29...07_...._N_.35_ 3 1.52 E ............. O. 3.30 .................... 7728.. 8.9 ........... . 335,05 N 45l+/+.60 E 7796.56 N 35 39 16 E 0.538 7796.47 341,67 N 4552.,.64...~. E ........... 780.6,_62 N_ 35__z+0 2.7. E ........... 3,25.1 ............ 7.8~0..6,.55 350.87 N 4.564..00_..5 ....... 78207..72 N..35 4.2 9. E 1.19.0 .............. 7820,67 ....... /+.ii... 1~, ...... ~ ......... ,..6~50,_80_.E___7..9.z.%...5..L..N_%%_5..~,..._5..6 E ............. 0../+,7~.' ....... INTERPOLATED-tRUE--VERT-! cAL. .... ~EP THS, ..... COORD INATES-AND.,-CL.OSURES ..FOR-.:.G ! VEN--, DEPTHS TRUE ._C_ODE ................ .,',,!EASUR.ED___VERT I_CAL ....................... TO_TAL ........ COORD I NATES C L__O__ S_ U .R E .NAI~!E ..................... D.E P_T_H DEP.TH D. ISTANCE ............... ANGLE ........................ D ....... ~ ..... T3P SAD, 1135~, _BASE_ SAD .........._l._l 5..7...]. 8_'77_.2.,.5.~____.6.2.2_3.,_09__N ......... ~z,.3. ~,.62 .... E_____?.629_,_93.__N 35 2 ~. 6._E 8 9Z.7 o 99 ........... 6SZ.Z.~ 06_..N ~.52 9, Z ]. .... E ...... __7.7..77 · O.S ....... N .SS_ S7 5 .... E ....... 8_e%3_o9.9 . MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. TRUE ........... MEASURED .............. 9-Ei~-TICAi] SUB MD-TVD VERTI DEPTH -DEPTH --SEA--DIFFERENCE ......... CORRECTION- .... TOT'AC ....-COORDINATE-S [5~ 1,~,. ....... loo o o 25~ 254. 200 0 0 1763.00 N 649.00 35~ 354. 300 0 0 1763.02 N 649.03 454 454, ............ 400 ...... 0 0 .............................. 1763.15 N 649.28-E 55~ 554, ........... 500 ............ 0 ........................... 0 i~63,23-'N .......... 649,65 .... 65~ 654, 600 0 0 1763.22 N 649,89 754 754'. ........................................................................................................................................ 700 0 0 1762.85 N 85~ --8'5'4, 800 0 0 !762.51N 650,54 954 ................................ 954, 900 ....... 0 0 ................................... 1762,!9 N 650,74 105~ 1054, ~000 0 0 1762,~5 N 650,76 ~.15..~ 1t54, ...... IlO0 0 .................................... 0 ................................. 1762.!5 N 650,.76 ~25~ ................................... 125~, .............. 1200 ....... 0 0 ~762,09 N 650.,.78 ~.35~ !_354, ......~3..0..0 ............ 0 0 176~,61 N .............. ~5~ .......................... ~45.4., .............. ~400 0 0 1760,67 N ........... 650,3~ 155~ 1554, 1500 0 0 1759,87 N ~854 .................. ~8.5.~., ........... ~800 ............... 0 0 1.757,_42 ..... N ............... 651,33 2054 2o.5,.4,.. ............. 2000 o o ~754_..9.4._,N .................... ~52.o2 ...... 2254 2254, 2200 0 0 1752,92 N 653,29 2454 2454, 2400 0 0 ;752,28 N 655,25 26~ ......... 26.00 ................... 0 0 1753..17....N 275~ ................... 2Z5~.- ...... 27O0 ......................... 0 0 ~ZS~..6.0__N ................ 285~ 285~, 2800 0 0 1757,29 N 659,67 2955 295~..' ........ 2.90.0 ................. 0 0 17..657~4__.N 663,93 3056 305~_' ..... 3000 ............ 1 ............................................ 1 17_79_,2..1 .... N 672.21 3261 3254. 3200 7 3 1816.48 N 701.32 3365 ............................. ~354, ........... 3300 ............... 11 4 1837.83' N 718.36 3469 3454. 3400 ~5 4 1'8'6~-'67'" N ...... 736. ~0 MEASURED DEPTH~.AND--OTHER~-DATA FOR EVERY EVEN 100 FEET OF SUB .... SEA_DEPTH, DEPTH TRUE VER~!CA~ ..... SUB ......MD-TVD ................... VERTICAL ,' DEPTH SEA DIFFERENCE CORRECTION TOTAL. COORDINATES 3682 365/~, 3600 27 7 1920,91 N 773,97 3791 375/+, 3700 37 10 390/~ 385/+. 3800 50 ~020 395~. 3900 66 16 2056,90 N 850,71 -~- 4140 405~. ~000 ........86 20 2114.~4 .................... 426.5 ............................ ~ 1.5~., .......... ~100 . 111 .......................................... 25 217g,22..._N .......... 921,53 ......... 4~ 96_ ~.25.~, ........ ~ 200 ......... ......... ~534 .......................... 4354, ~300 180 38 2332,24_..N ......... 1016,.16 ............... ~6BO ................... ~5~, ........~400 226 ~6 2~22,96_N ....... 1.071,36. ~.8.3_8 ~.5,5.~ · ............ ~ 5 O0 ............ 283 57 25.2 Z ~,3.8_N ....................... 5008 ....................... ~.6.5~, ~600 5 ~80 ........................ 4.~_5 ~, ~ 700 ~26 ............. 552.7 ............................. 49.5~, ~900 573 7~ 2995,.2 5.....N 1~3,57 .... 5692 .......................... 5054- .......... 5000 638 65 3096,.O0..~,..N ........ 1527.,..3~ 5.8~ 5..!.57, ............. 5 ~ 00 ............. 698 6 0 3.1.90.,.. 2.1_N ........ 160 9,. 53 .... ............................ 6.01.2 ................... 5.2.54 , .......... 52 O0 . 758 60 .~;~ 3284 ,..09__.N ............ 1691,..60 6172 535~, 5300 818 6333 5~5~, 5~00 878 60 3~71,~2 N 1858,56 66'5'5 ................. 5'6' ............ 5'6 o o o ...................... 68-17 67-5~. ............ 5700' ............................ 7!~3 .......................... 595~. .......... 5900 1189 63 3950"'OI-N .........2279.55 7779 6-35~' ................... 6'300 1~25 56 .318.30 N 2608"98 793'3 6%5'~-, ....... 6'~'00 ....... %4'79 5'~ ~'~'d6-," f'3'-'N ...... 2686'"73 8235 665~, '6600 1581 51 4'5"76.67-'N ............. 283~'''98 8386 675~, 6700 1632 51 4661,93 N 2910,18 85........................ 6' 8 mm54,................ 6800 ........ 1687 ............. 8859 705~. 7000 1805 61 ~9"3"2-'-2B-''N .......... 3i56'"28 ...... ..~..EAS.UR E.D ._D EP _T H...AN_P__OT_HE_R .__DA TA .=FOR E V E R y__EV E N 10.0 ...F_E RT._OF_.~5 UB__$E A ..... DEP_T_H., .................................................................. . ........................... ,. TRUE MEASURED VERT!CAL SUB MD-TVD VERTICAL 9176 725~+. 7200 1922 57 511a,.60 N 3321.29 E 9332 735/+, 7300 1978 56 520~+,76 N 3399,82 E 9485 745z+. 7z+O0 2031 53 5290,77 N 3~77.29 -E 9783 ........................... 76 5~., .....7600 2129 ..................... ~8 .................. 5~5_2__,3 3_.N ........ 3528,12 _.E ................ 9930 77 5~, .........? 70.0 ...... 2176 ................................. ~ 7 ............................ 55_30.,._12_.N ........... 3703 · 03 E j - . ~007.8 785b, 7800 222~ .............. ~8 5607,23 N 3779.69 E ~022~ ............................ 795fi., ......... 7900 ........ 2270 ............................... ~6 5682.58 .... N ! 0369. 8.0.5 ~_, ...... 8000 .... 2315 ~ 5 ................................. 57_5.6..2.7_N ........ ~ 928., 81 E ~05~ 1 ................... 815~_., ....... 8100 ........ 2357 b2 5.828.,89__.N ............... 3998,98 E ~0650 ........................ 825~., ............ 8200 .....2396 39 5897.,67_.N ....... fi057,50 E .~.0788 ~835.~_, ......... 8300 .... 2~34 ........................... 38 595fi.10 N ~135,01 E ~0923 .......................... 845~, ......... 8~00 ......... 2~69 35 6027,60_N ........ fi200,~2..E ~ 11.9. Z.._ 8 ~ 5~., .............. 8600 .... 2537 ............................... 3.~ 6.!~.8.,.90._N ...... ~.3 Z.1328 ............................... 875~, 8700 2574 37 ~01,., ~ 2 ,E ,": Z1~58 8854, 8800 ....... 26.1~ ~0 6275,21 N ~7~,85 E 11607 895A., 8900 2653 39 6338 ,.I 5....N 11747 905~. 9000 2693 40 6399,84 N ~62~,~8 E --INTERPOLATED..VAL, UES-FOR .... EVEN ~000 FEET--OF-.-HEASURED.-DEPTH, .................... : : TRUE__ ' ...... -HEASURED .............. VERT ! (:AL SUB . t, ...... DEP TH ................ DEPT.H ................ ,.REA COORD !NATES lO00 999. 9~5. 1762.15 N 650.76 ................ 2000 1999.. ........... 1945. 1755.76.N ........... 651..69_E 3000 2998. 2944, 1770.92 N 667.0~ 4000 .......................... 3936, 3882, .......... 2047,71 N ......... 845,59 · 5000 .................... 46~9, ~595, .............. 2639,30~N ...... 1202,96 ..................... 6000 .......... 5246.~i .... i.._5192. .............. 32.77.04,._N ........ 1685..46_.E 7000 ............................ 5866, 5812, .................. 3865,50 N 220~,72 .... 8000 .............................. 6~98,_ .6444, ............... 4~4~,21N ........ 2719,8~__E ..................... 9.000. 7.141, ....... 7087., .............. 5.013,83 ....N ........ 3230,!7__E .......... 10000 ............................... 7801e ...... 7747. ........................ 5566.75 N .... 3739.22_E 11000 ...................... 8511. ...... 8457, ............6063.~0.N ............. 4237.00 .4oo S'CALE :. !" ' ; ............ ! .................... J .......... ................... = I000 ................................................................ :_ ......................... ATLANTIC RICHFIELDCO ..... aoo ~ . DRILL SITE 9-8 ................. ~ .......... ~ ............j .............. ............................ ~ ....... i-"'-~"-'GYRO SCOPiC"' SURVEY ........................ ~ ....... 1200 - RADIUS OF CURVATURE METHOD _ .; ..... ~ ....... t . 1600 ......... r 2000 ........................... · ALL DEPTHS SHOWN - 240o ....................................... ARE _ T.V. D 2800 ............... ' ' ........... !'-i-i'-"'-'~°°°i ................. '. .... : .... ~ ................ :_~,_.. _._.i_- .............. _ .-.-~ · _._~ ........ ~-.._' ..... ;~_._. .... :i~_.~_:._.~_'.:.i.._~-~___~ ' · . ..... ...... ' .......... :: ...... , - 76~:oo · _. ooo-' . ~ _ .' _ ..... . .' .... _. 0 ..... i ....... : ....... ' ~ ' ' _'. .... ._i . _:._i T)V.D--_ 9,088. .......... . ............................................ TMD: 11',795 '-i ................ ~ ............... , .......... : . : ! i .'...I..~.'__" ' . ' - - HORIZONTAL VIEW SCALE I"'=1000 ATLANTIC RICHFIELD CO. DRILL SITE 9-8 GYROSCOPIC SURVEY RADIUS OF CURVATURE METHOD ~ ~ 7200 6800 _ -- .......... 6400 ALL DEPTHS SHOWN ARE TVD 6000 4000 3600 3200 52O0 · 4800 56O0 4400 8000 7600 8400 8800 ..... TVD= 9~088' - - - . _ TMD; I t ~795'- .................. Eastman ~ Whipstock l A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY Atlantic Rich£ield Do So COMPANY 9-8 Prudhoe WELL NAME- LOCATION JOB NUMBER A1076 S0213 TYPE OF SURVEY Multi-shot DATE 12-8-76 SURVEY BY Jay Martin OFFICE Alaska .CONIPLETION-REPOR-T ] ................ NOVEMBER _8, 3.976 ..ATLAN T! ¢_ Ri. CH F. I~E..~D_~Q.,_~ DR I.L.L_.5 IT E__9-_8 ......... .JOB..A], 0765023. 3 NAGNETIC_MULT.I-EHO_T__EURVEY K,B, ELEV,~.5~, ....... FT_, .... AU .~,55-0-90 ._RAD I tJS_. OF CURVATURE_HETHOD_ OF. COMPUTAT Z ON5 _C_O M P ~j T ~ O F 0 R EA_$ ~M. A N_ W H. Z. P..S _T 0 C K ...... ! N C · ..... B Y_ F. · ...... M_e_L. I. N D_5 E Y_ A N. D _A.55 0 C .! .A TTS .................. RECORD_OF__SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER _N. EAS. e__DR.IF_T__V~R~_I.CAL SUB DRIFT TOTAL. COORDINATES ¢ L 0 S U R E S. SEVERITY SEC.'ri?' N DEPTH ANGLE ..... DEPTH 5EA'.-..-i-DIRE¢ .................... · './.- ' i. "_' I_57",,.~'~'-~[ ....................... D ~4 DEG, D ....... M 5 .... 2712 ........ 0 ..... 0 .... Z?!.2.~,_O0 ....... 2658_, O0 ...... N27. OOE ..... ! 763. O0 .... N ...... 6~9 · O0 ....... E ............ ~83_8_._66 _N .... 20 ..... !2 ...... 35 E ............. 0..000 ..........~8.! 0 _2779 _1_3_0 2.7!8,_99 27.27.,99__N27,OOE 176.3.,_78_N ..... 6~9,39 ....E !_8.7~,.5.3 ..... N .... 20_!2 ....~6._.E ............. 2,.2~3..9 .... 2872 5 0 287~,82 2817,82 N27,00E 1768,~7 N 65Z,79 .... E ........... 18.8.~,.7.6.N.~.2.0 1_3 .... 5.~ .... E ................. 3,.7_53 ........... !815,07 _2966 ...... 8._~5 ....2965,_!8 291.1,18 ......... N30,50E 3.777,98_.N ..... 657,00 ....E ........... 1..8.95.,.~9 N_20 16 ..... ~9~_.E ........... 3,~.58 .................. !8_2.6,$3 3152 1~ 0 31~7,34 ~093,34 N40,OOE--'-l$07,68 N 679,33.5 .........~93.!,~1~..N..20 35_~7.E ....... 2,206 ................... 1.86.3,98 32~5 ~5 0 3237,38 3183,38 N40,50E 1825,45 N 69~,38 E 1953,06 N 20 ~9 34 E 1,078 3338 16 0 3327°00 3273,00 N38,OOE 1~4,89 N 710,10 E !976,65 N 2~ 3 ~ E 1,094 1912,00 ..... 34~2"~'7 ..... ~0 .............. 3'~'i?'o0'8 ........ 3363',08 .... N38,'OOE '-18~5,8~'N ................ 726,62 ....E ....2002,33 .... N-21 ...... f~ .... 39-E ........... [','2'~5 ............... 1"9~8';'8'1 - ~524 ~8 0 350~,78 3450°78 N35,00E 1888,~8 N 7~3,~5'E .........202'9*~'6 ..... N-'2'l .... 29 ........ 1 .... 5 ............... 0,95~ ................. ~966o~0 3616 21 0 359~e50 3537,50 N32,00E 3.9!3,78 N 750,~0 E 2059,20 N 2.~ 39 ~l E 3,288 !997,28 __3709 25 0_._3.677,09 3623,09 N30,OOE ~944,92 N 778,8~ E 2095,06 N 2~ ~9 22 E 4,318 203~ '~9 3895 29 0 38~2,B3 37fl8.83 N29,00E 2017.77 N 821.28 E 2178.50 N 22 8 51E 2.282 2117,~2 --3986-31--~0~--'~9'2"1"'30 ...... 3867,"30 ....... N30,50E .... 2057';'7'6-N ............... 8~4,i4-E ....... 2'2~2'~,'lS--N-22--f'8 ..... !'5-E ........... 3,!5~ '2~1~3".'23 ....... '-a079-33-55 ........ 3999,39 ......... 3945,39 N31,OOE .... 2!01,16 'N ............ 869.95-5 ........ 2274.13'-N'-22 ..... 2'9 .... 28 E ......... 2'25~ ............. 22!3,53 ..... ~173-36-'~5 .... ~076.06 4022,06 N30,50E 21~7,88 N 897,75-E .......... 2'3'27,95 ..... N-22-41 ..... O-E .............. 3,006 2267.69 .... ~359 ~1-'3'0 .... ~220".'~2 .....~1~6.~2 N31.50E 2248.3~ N .... 958'13 .... E ........... 2~"~"'98-N ..... 23 ....... ~ .... 53-'5 ............... 2.~70 .............. 2384'.'50 ,5~7'-~6 0 ~56"78---~-302".78 ....... N32.00E .......2358.77 .... N ..... i0'25",~8--E .......2572'-.0~"'N-'23-29 .... ~9- E ............. ...... ~6~1 ~8 ..... 0 ........ ~'20'.§~ ......~366.~8 N3~OOE ..... 2~!7.38 ...... N ..... 106'~.'~d--E ..... 26~"0',13 ..... N--'23'"4-'2 ..... ~7' E .............. 2;207 2582"03 --~735'-'5!""~0 .... ~81;'$1 ....... ~27153. ......... N31.OOE ......... 2a7'8"87 N ........1098-'3~ ....E ....... 2711.30'-N-2'3-53- 50'-'E ....... ' ............ 3'.723 ................... 2653 ---~ 8 "2 6--5 3--- 0 ..... ~-53T'-32 .... ~ ~8 3 "32 ........ N 3 ~ · 00 E---25 ~ 0,5 g'-N .....11"'35'-.'~0--E ......... 2'78 ~"'71 ....... N-24 .....~-"'~ ~ ...... E ............ !'.~ ~ 8 ....... 2725'.'2 RECORD Of SURVEY AL~-'--~A-~-CLIL-ATIONS PERFORNED BY -I B N "E~'ECTRON-[~ .... C'ONPuTER TRUE ..DOG_LEG ~~'-'"DR'~j-F~-'~E-RTICAL SUB ........... DR'IFf ..........TOT~'~-'-'~RDI-~-~'TE"~ ................ C"-~-'-O--~'-'~-'R E $ SEVERITY SECTION '"DEPTH ANGLE DEPTH ....... SEA DIREC ' ' DISTANCE ' ANGLE ................ DEG/ZOOFT ........... DISTANCE" D M DEG. D ~ S 501! .... 54 .... 30 .......... 4~45',07 ..... 459!,07 ..... N32,00E .... 2669,09.-N ....... 121'3,41E ~5105 .... 5~-~5 ~699,59 ~645,59 N33,00E 2733,67 N 125~,55 E ~198 5~ 50 ~753,31 A699,31 N32.00E 2797e70 N 1295.3~ E ~291 5~ 50 4806,87 ~752,87 N32,00E 2862,17 N 1335,63 E 293!.97' N'-2~-"26 ..... 50 E ............ 0-,893 ........ 287¢ ,3 3007,80 N 2~ 39 6 E 0.713 2951.57 3083.02 N 2~ 50 39 E 0.767 3027.36 3158,48 N 25--0-58 E ......... 0.000 ......... ~103.23 ~53'85 ..... 5~"-55 ~860'-,9~ ~806.9~ N33,00E 2927,02 N 1376,95 E 5~78 55 0 ~91~,33 ~860,33 N~I,OOE 2987,79 N ~22,7~ E _557.1.53 ..... 0 ..... 4.968e99_ A914,99 N36,00E 30~6.65 N 566~ 52 10 5025,~9 497]..~9 N4!.OOE 310~,4~ N !515.52 E 5757 51 0 5083,28 5029,28 N41,OOE ~..5850 ~'.~ 5 ! .' "' ..0~5.~ ~,..8.!~2~5087,81 "..i N 41,00 E ......... 32'13,9'8.~N~-'~i~i~'61'0' '75 e ..... 5943 5~ 45 5199.86 5~45,86 N41,OOE ...... 3268,81N 1658,~1E 6036 51 30 5257,59 5203.59 N~I,OOE 3323,8~ N ~706,2~ E 6129 5~ 15 5315,64 526~.64 N~I,OOE 3378,67 N 1753,91 3665,44 N 26 5a 2 E 0.806 3?36.20 N 27 ~0 23 E 0.269 3806,79 N 27 26 3 E 0.269 3236.73 N 25 11 36 E 0.719 3180.00 7309.2~ N 25 27 ~7 E"i .... 5.773 ............ 3256.07 3382.56 N 25 45 1E ..... 4.048 .................. 3331.19 3454.62 N 26 1 14 E 3.471 3~04.95 3525.06 N 26 19 36 E 1.258 3477,5! 35'95e02 'N"26 3'7 ..... 7-E ............... 0.000 ................ 35~9'-.~8 ....... 3621.83 369~.~3 3766.79 6223 51 15 5374,48 5320,48 N41,OOE 343~,00 N 1802,01 E 3878.09 N 27 41 18 E 0,000 .... 631'5'-'51 ........ 15 .......... 5432,07 ...... 5378,07 N41.OOE ...... 3488,15 .... N ......... 1849.08 E 39~7,95 N 27 5'5-~! E ......... 0.000 6~09 51 55 5~90,~7 5436,~7 N41,50E 3543,53 N 1897,6~ E ~019,66 N 2'8 10 !2 E 0,795 I--'6503'--'5"I ....1'5---%5~'8"8"7 "5494.87 ........ N41"OOE ....... 3'598"'"90--N .... 1'946.21 .... E ........ 4091.'44'-N .... 2'8-~4 .... 1'2 ..... E ............... 0.792 6595 52 10 5605,8? 5551,87 N41,OOE 3653,40 N 1993.58 E A!61.94 N 28 37 13 E 1.000 _6687 .... 5.2 ..... 0 ..... 5.662_'._~.2__5.608 · ~ ! ...... N 4 !...'_,00 E .... 3.~08_'..Z.8 .... N__.2.0 ~!_.'.. 20_.E ..... ~ 2.32~ 8 6 .... N ...... 2.8._~?_5 ! ..... E ....... 0_,..!8~ ...... 6780_..5.! .... 50 ...... 57~e,77 ...... 5665,77 ..... N~Z.OOE ........ 3_76.3.,~.~ ........ N ........ 2089,23_E ....... ~30~.~5 .....N....29 ...... 2 ........... ~!..E ...... 0.~72 3839.79 3911,23 ~129,77 4274.95 _6873.52 ......... 0 ....... 5777,.12 ....... 5723.12 .... N41,50E ......... ~.8!8.,_4.6__N .......... 213.7.._~9 E .......... 4376,,.0_2 ..... N..29 ...... !~ ...... 2.1 ..... E ................. 0....3.7.6 ............. 43~7..82 _..6967_52__0 .... 5.8.~5...00 5781.00 ....... N42..OOE .~.8.7_3.,_7..3__.N .....2.!8.6_._82._E .......... ~.8..~.6 ..... N.....29_._~.6 ..... ~..5 ...... E ......0....~..[.9 ............... ~4..2..[~....~.8 ...... ........ 7060 52 ..... ~ ......... 55e2.,20 ....... 5838,20 _..N~i.,OOE ..... _3928,65 ..... N .... 223.5,~1 ....E ........... ~520~_1.0 ..... N...29...._~8 2.3...E ................... 0.,.676 ....................... ~9~,~ ...... 7152 .... 51 ..... ~.5 ......... 5948_,9~ .......... 589~.,_9~ ........ N~l.,..50E__~983_,09 ..... N ..... 2283,!..5 ..... E ......... 4591_._06 ...... N.__29 ....... 49 ..... 18 ..... E ............. 0,~.99 .................... ~.565,53 __72~6 ..... 51_55 ...... 6007.,02 ......5.953,02 ..... N~l,OOE._.4.038.,66_N ......... 23~!..,.89 .... ~ ....... 4.663.,53 .... N_30 .............. 0 ...... 6 ..... E .................. 0....38! ......... ........ 7340.5! ..... 10 .......... 6065,47 .......... 6011,~7 ......... N41,OOE ......... 4094.22 .....N ......... 2380,_18 E .......... 473_5,8! ..... N.,..30 .... i0 ...... 18 E .............. 0,809 .................... ~713.40 7~33 5~ ~0 ........ 6123.,_78 6069.78 ...... N~I,OOE ........ 4148.90.N ....... 2~27...7.! .... E ......... ~806,99 N...30 20 2 E ._ .... 0.000 .................. A785,55 ...... 7526 50 20 6182,62 6128,62 N~3,00E ~202,42 N 2475.90 E ~877.55 N 30 30 !7 E !.556 4857,14 ~-~'~';--~R-~F-T'-'~TIC~ ..... ~gB .... ~RIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/IOOFT DISTANCE D M DEG, D M $ ..... 7713 50 ...... 0 ...... 6~02.,60...]_6248,60 _..N42,50E 4307,53 N .... 2573,49 ...... E 5017,74 N 30_51 2!..E .......... 0.412 499[ .... 7899 49....~0 ...... 6422,36 6368,36 ..... N41,OOE .... 4414,32 N 2667,56._E ............ 5157,72 N 31._. 8 40 E "0,634 ............. 51~1,08 __7992 ....49 0 64.83,07 ...... 6429,07 ..... N4Z,OOE 4467,~9 .... N .... 271.3..,78_E__ 52.27_,!5 N..._31 16 .... 35 ..... E .................. 0.538 52!.1,.2~ ...... 8085 ~8 ...... 0 ......... 6544,69__6490,69 N41,OOE 4520,06 N 2739.~8.E ...... 5295,81N 3!_2~ !~ E ......... 1,075 ................. ~280,60 8178 48 25 ........ 6606,66 6552,66 N40,50E 4572,59 N 2804,7~ E 536~,25 N 31 31 27 E 0,552 53~9,68 ~8270__51_.2.5 66.6~_,.87 ..661!,87 ...... N4!.,OOE. ~625,92 .... N_ ..2350._,.70 .... E ...... 5~33,7.5 ....N._3.1_38 .... 35_ E ............... 3,278 5419,81__ ..... 8~62 50 .... 50 ..... 672.3,60 6669,60 ..... N42,00E .......4679,57 N 2898,16 .... E ...... 550~,34_~.N .... 31 .... ~6__15 E_. 0,916 .................. 549!,08 8456 50 20 6783,28 6729,28 N~2,00E 4733,5~ N 2946,76 E 5575,82 N 31 54 12 E 0,532 5563,28 ~ 550.__50 ._0 ...... 68 4.3_,~ 9 .... 6789 · 49 ........ N 43_, 00 E ........ 47 86 · 76 ..... N ...... 2995.,. 53_E~5.646.,y.9 ...... N_.32 ...... 2 .... 1...7 ..... E ............. 0., 721 .......... D 634 , 96 8644 50 55 6903,32 6849,~2 N41,OOE 48~0,&3 N 3044,03 E 5718,2! N 32 9 49 E 1,620 5707,02 8738 51 55 6961,93 6907,93 N42,00E 4895,68 N 3092,73 E 5790,7~ N 32 16 5~ E !,2~2 8831 51 50 7019,3~ 6965,33 N42,DOE 49~9,8~ N 31~1,93 E 5362,82 N 32 24 19 E 0,~.6 5852,8~ --~92~-51--25 ~077'*-05---7023,05 N42,00E~"5003,81 .... N ..... 3190-,'95-'E -5~3'4,67 .... N-"32 .... 31 ..... 33 E ............... 0,550 5925,29'--' 9016 51 5 7134,63 7080,63 N~2,00E 50~7,!~ N 3238,97 E 6005,47 N 32 38 18 E 0,370 5996,62 9110 50 35 7193,99 7139,99 N41,OOE 5111,73 N 3237,27 E 6077,49 N 32 44 39 E 0,828 6069,1~ 9203 50 45 7252,9~ 7198,93 N41,OOE 5166,02 N 3334,46_..E ........6148,69 N 32_.50 26 E 0,I72 .... 6!~ 78 9296 50 5 7312,18 7258,18 N40,50E 5220,32 N 3381,25 E 6219,69 N ~2 55 53 E 0,777 621L A8 9390 49 30 7372,86 7318,86 N~3,00E 5273,88 N 3A29,05 E 6290,6~ N 33 1 54 E 1,66! 6283,57 9~83 ~9 0 7~33,57 7379,57 N~O,50E 5326J43 N 3475,96 E 6360,28 N 33 7 ~0 E 1,623 6353,63 9577 43 5 7495,80 7~41,80 N44,00E 5378,57 N 3523,32 E 6429,84 N 33 13 38 E 2,278 6423,62 9671 48 0 7558,64 7504,64 N~4,00E 5428,86 N 3571,88 E 6~98,53 N 33 20 33 E O.Og6 6~92,80 9764 47 5 7621,42 7567,~2 N43,00E 5478,63 N 36!g,ll E 656'6~,-08 ..... N'"-33 26 53 E 1,136 6560.79 9857 47 ........ 5 ....... 7684,74 .......7630,74 .... N43,005 5528,45 N 3665.57-E ........ 6633,26 N 33 32 ~5 E ~ '-0,000 ...................... 6628,36" ..... 9951_.47 .... ~5 ......... 7_748.,53 7694,53 .... N4~,OOE 5578,9~ N 3712.65 E 6701.37 N 32 38 34 E 0,362 6696.8~ ...10044 47 30 ........ 781.1,40---7757,40 N44,00E'--i~5628.65 .... N ......... 3759'82-'5 .........67'68.89 ....N'33 ~4 31~ E ............... 0,589 ....... i ............. 676~,75 10137 46 55 7874,57 7820,57 N45,00E 5677,33 N 3807,66 E 6835,96 N 33 50 56 5 0,840 6832,20 10230 46 55 7938,08 788~,08 N45,00E 5725,37 N 3855,70 E 6902,63 N 33 57 28 E 0,000 6899,26 RECORD Of SURVEY A[.,~--CAL----C-O'["A-T'~ONS--P'E'RFoRh4ED BY I B M ELECTRONIC COMPUTER TRUE DOG LEG DEPTh ANGLE DEPTh - SEA DIREC ........ D'-N DEG, D 10510 ~+~+ 50 8133,59 8079,59 N~+z+,OOE 5568,71 N 3995,76 E 7099,85 N 34 l/+ 57 E 0,516 7097{ 10603 ~4 0 8200,01 8146,01 N~5,00E 5915,13 N 40~1,39 E 7163,91 N 3~ 20 31 E !,0~2 .............. 7161,75 ~.0696...?3__25__8267.e..23~8213.e23 .... N~5.eOOE .... 5960.,.58 N ~086,83 E__7227,08 N 34 26 10 E 0,613 _1.0790..._~.2 .... 5_5 ..... 83_.3..5.,77 8281_.,77 ........N~5.,_O.OE ......... 6006.06 N ......... 4!32_,~.!__E .... !29.0_,~32__N._..3._9_.3~l_?_4_E ............ 0,532 3288,.6.7 _!,0976 41 E 7..~1.3.,~_N ~.~_4_2_2.6_E~03_58,9 3.!068_..~ 2 .....5 .... 8.5~.1..,.~.2 ..... 8 ~87 ,~ 2 ...... N47 · 50E ...... 613 6 · 98 ..... N ......... ~ 265?? 0 ...... E .......... 7.~.7.3.,99 N_.3.4_~78 ....13 ..... E ......... 0,9 92 .... ~.4.72_79 ~__ _~..1162 ..42~.0_.~61...1.,.1_3 .......8557.13 ..... N47.eSOE 6179,58 N .......... 4312,..39_E .... 7535_,52 .... N._...3.~ 54__32__E .......... 0,085 ......... J 1379 ? 3 ....... ~.0.__877.0.,.39 ........ 8716 ,..39 .......... N48, OOE ......... 6278,2 a ....N ....... 4~ 21_.89 ...... E ........ 76.79 ~! 6 ...... N.....3.5 ....... 9_.2.~_E ................... 0., 827 ............... 767. 8..,.75 _!.!~72 .... 44 ..... ~ ...... 8837_.,77 8783,47 ......... N~9,.50E ......... 6320,70 .... N ...... 4~70_..32_E_____~.~.4~!777 .... N.._35 ..... 1~6 ..... !.,! .... E ................ 0,855 ............ .~..~565._~.~ ...... 0.__8.90~3.37__88 50.,.37 N~9. e_50E.__ 636 2.,66_N__,4.5!~%,~4 E 780~,?~.~_N_3.~_23._1_! ~q%000 __ 11658 4~ 15 8971,13 8917,13 N~9,00E 6~04,93 N ~568,49 E 7867,29 N 35 29 57 E 0,375 7867,22 Ns, ....OOE ...... OA_N_35_ . _3_3_E 0.!.2 ~X795 ~5 0 9068.56 901~,56 NSX.OOE 6~66,01 N ~6~2,95 E 7960.29 N 35 ~0 ~9 E 0.385 7960.~9 ~---I N TER DOI. AT-ED--TRULVER T ! CAI. .... DEPTH S , ..... CO.OR D INA T ES--AND-C I,OSU RES-£OR_GI V.EN.. DED Th$ TRUE _~ODE ................... ME A SUR E__D .... VER T I CAL T_OT AL ........ C.OORD.I.NA.TE$ c I,_O_S_U._.R__E SUB__ NAME DEPTH DEPTH DISTANCE ANGI,E SEA ~ D .,',4 S J_o_.P_SA o., t t ~ 5_~ _BASE_~.SAD .... 8908,69 6365,/~0 N 4522,59 E 7808,46 MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. MEASURED DE?TH TRUE VER T ICAE-SOB ........ MD';TgD .................... VERT I 'C',~ L: ..... DE'p-TH .... SEA-'-D"i-F F E R EN CE ........... CORRECTION TOTAL COORDINATES 25/+ 354 454. ~ . 554. 654 754 85/+ 954 105/+ 115/+ 125/+ 135~ 1~+54 1_5~, 100__0 0 1763,00 N 6/+9,00 254. · 200 0 0 ]~"7"6'~:~-.'-0'0--N ...... 6 z+'9".' O0 354, ............ 300 .............. 0 0 ............................... 17'63-'"00"-N ..... 649.00 4. 5'4.'. ....... 400 0 0 1?'63-'-00'- N ........... 6 z+ 9' 00 5-54 .--500---- O-- 0 1763.00 N 649.00 654.'. .......... :600 ............... 0 0 -f7~3-,-0 o- N ............... 64g'. O0'-E 754." ......... 7 O0 .......... 0 0 f~ g3'"O O--N .............. 6 ~+'9' 00 85/+ .-- 800 ......... 0 .............................. 0 1"?'6'3-,'"00-N ........ 6'4-g. O0 9' 5'/+. ......... 90 00 0 1-7-6'3"'0 o--N ........... -~ z;9. O0-'E 1-054.. 3.000 0 0 1763.00 N 649.00 f5"4'* - 1 ~.0 o-- o-- 0 ~- £7-~3-*-0-0 N-- 6v+°9-'-o'o-E i'2 5 4. * ...... ~. 2 O00 0 ; .......... ~7-63-"00-'N ......... 6-~;~ ,00 1-'3-5"/+-' ..... 1300 ................. 0 ............................................ o .................................... i76'3-*-00-N ............. 6-49;0'0-E ~5'4-.----1-~0 0 0 0 --Z"T63VO'O-N ........ 649-*'O0-E .................. i 55 z~ ............................. i 5' 5~" ......... 15 O0 ..................... 0 ............................................................................ 0 i763' '0'0--N ...................... 64-g ,'00 205~ 205~. 2000 .0 0 ~763.00 N 6~9.00 235'~ 235'~'. .....2'300 0 0 17~"~'~-0 O- N ................ 649¥00 2~5~ 2~5~. 2~00 0 0 1763.00 N 6~9.00 2554 255 ~. ................. 250'0 .................... 0 0 I7'63-;0'0"- N ............ 6 ~-9' '00 .................. 2754 .................... 27..5.4, .......... :..27o0 o o ........................... Z7.6.3-.3o_ N .................... 6 ~9., 2955 3056 3!5 9 3262 3366 3471 ....................... 3576. 285~.. .............. 280.0 0 O__ 295.~. ....2900 .................... 0 ...................................... 0 3.05_4, .......... 3000 ............... 2 2 31.54,,., .... 3,!.00 4 2 3254, 3200 8 4 33.5/+,, ....... 3.300 .............. 12 ............... ~ ................. ~ 355~. ...... 3500 ....... 22 ........................ 6 1767,17 N 651,12 E 1776_,_6~ N ........... 656,.18 ..... E 1791,00 N 665.76 E Z.B_O_~.9~_N ........ 1828.85 N 697.21 E 1850,84 N 714.91 E 1875,00 N 733,62 E ~.90.2~08._.N ............ ~52..,,~8 ...... E .............................................................. J~-,EASUR ED. DEPTH-AN D_OTHEP,-,-DATA-FOR EVERY..._ EVEN-- 3.00 F EET__O F_SU B-S TEUE MF,ASURF,D VERTICAL SUB MD-TVD VERTICAL DEPTH D-E-P"r-H SEA--D-iFFERENCF, CORRECTION TOTAL. cooRD-i N~-T E S 368~, 3796. 3908 /4.025 ~1~5 6.272 ~0~ 3654. 3600 29 ..... ~ ..... 1935.87 ~ ............773.51 3754, 3700 6.0 11 1976.90 N 797.62 38.54,, 3800 ........53 ....................... 1_3 ........................ 2023.72_~_N ..........82~.31 E 3954, 3900 70 17 2075,61N 85~,53 4054, 4000 91 21 ................................. 2133...6_6_N .......... 889.21 ,.LL i o o o ........... 9 a., ~2.56.., ..... 6.200 .......... 150 33 2274,11_N ........ 97.3..62 6.354. ~300 189 39 2356.33 N 1023.96 ...................... 6.69 2 ........................... /+456. · /+854 5026 5.! 9.9 5,.3.7_3 5546 5710 5869 · . 6030 6190 6350 6511 6673 6835 6998 ..... 6.400 ...... 237 ..................................... 6.8 ..................................... 2450,.35_N ........ 108!,21_..E .............~ _ ................................................. 4554, 4500 299 62 2559,79 N 1146,96 E 4654e .......6.600 ....... 372 .............................. 7.3 ............................ 2679_.~_N ........ 1219,90_E 475~, 4700 4~5 73 2798.39 N 1295,78 E ~854, 4800 518 73 2918.70 N 1371e56 E 4954 · ............ 4900 5.92 7.~ 30.30..52 N ............. 145 5054, 5000 656 64 3131.85 N 1539.35 E 5154, 5100 715 59 3225,13 N t620,~6. E 5.2.54e .......... 5200 ......... 7.76 ............................................ 6,1 ..................................... 33.20..,.29__N ................. 1703,16 ...... E ~':' 5354. 5300 ~35 60 ,. 34_l.~__5S_.N. .......... 1.785 · 5454. 5400 896 60 3508.79 N 1867.02 E 5554, 5500 957 61 3603.62 N 1950,30 E 5654e 5600 1019 62 3699,85 N 2033.96 E 5754 ,__5700__1081 62__ 33 96_...08_N 5854, ......... 58.00 ........ 1143 62 .......................... 389!785_N ........ 2203,0_~ ..... E 7!.60 7321 ................. 7637 7793 5954.., ........ 5.900 !206 63 6054. 6000 1267 61 6~54, 6100 1327 60 6254, 6200 1383 56 6354. 6300 1439 56 6 ~ 54, 64 o o .... i~"93 ~4 3987,84 N 2287,28 E 4083.03 N 2370.~6 E 4176,79 N 2452,40 E 4264,75 N 2534,00 E 43-5'~"~'0--~- 2614'18 .... E 44-4'f',-8'i-N .... 26'91"-~"$ ....... E .......................... 8099 8251 8410 ................... 8566 872'5 8887 6554. ...................................................................................................................... 6500 1544 53. /+'527-.--8'7--N ................ 27 66"2 6 .... E ............................................................... 6654. 6600 .....1-597 53 461'?+-*-93 N 2840"7'8 E 675'4?--6700 1 656 -- 59 47-O"7-e-i'7-N 6-8'5x+". 6800 ......... 1'7 i'2 56 4'7'9'5',"T6--N .......... 3003'* 8 7 .... E --69-5/+'~' .... 6900 ..... 1771 5'9 /+ 8'88'-,"06-N .......... 3085' .'8 9 .... E 7'0"5/+'.---7'0'00 .... 1"~33 -- 62 4 982-'7+'5-'N ...... 3171-,3 0 .... E , ~_E.A.$..URE~._DEP.T_H_AN?_O._T~.ER_DATA~FOR ..... EVERY_E_v.E.N lOO_FEE_T_Of_SUB_s..E.A_DE_.P_.TH, TRUE MEASURED DEPTH VERTI:¢AL SUB MD-TVD VERTICAL DEPTH S E_A_D_!,.F_F_E_R E N ¢ E CORRE~ T/ON TOTAoL ¢.Pg. RD_I_N_A7 E S 904.6 920/+ 9361 9514 9664 9812 9959 ............ _~.o_10 7 10253 10397 10539 10678 10815 7154. 7100 18.~2 __59 7254, 7200 1950 58 7354. 7300 2007 57 7454. 7400 2060 53 ?'~5'4. 75 o o--2-1'1 o 5-0 76. 5.~.,____7600 2_!58 ............................ 4.8 7754. 7700 2205 47 7854e 7800 2253 48 7954e 7900 2299 46 8054e 800,0 ..... 23.43 47 8154_, ......... 8100 ....... 2..38.5 42 8_254., ........ 82.00 2.42~ ........................... 39 8.~.54.. 8300 ........ 2.~.,~ 3,7 50.7_4..,.5_1__N___3 5166,60 N 3334.97 E 5257,75 N 3413.82 E 5344','].-6-N ....... 3491', 19 E 542' 5';Tl--N'---3 550 ~., 26_N ........... 36~_3_,_0.1 ....... E __5,5.83.,_Z4_N .......... 3,7._1.6,.,~ 7_E 5661,,66 N 3792,08 E 5737,22 N 3867~55 E 5.8.1.~ ].._.0 o_N. ........... 3.9.,4 o. ;_3. O_E 5883_o 20__N .......... 4009,8.3 ....... E 5.95.1., 69...._N .......... ~.07.7_.,9 5 ...... 601,8...0 !_N ..... 4..1.4,~_._2.7_E 10950 11085 1122O .................... 11356 8554. 8500 2530 34 6144.73 N 4274,21 E 8 6.5_4_. ...... 86o. o ...... 8.7.54.., ............. 8700 ........... 2 602 3 7 ........................................ 6267,63.__N ............. 44.10..,..11 ...... E .... 88_5~... ....... 8.8.00 8954, 8900 2680 39 639A,,16 N 4555,68 15 ................ 1 ~ 77./+_ ................ 905..4_' ............... 9.00.0 ..... 2720 ........................... z+ 0 ........................................... 645.6.,67...N ......... 4 $ 31_,..~2 ....... 15. ................................................................................................................. '-INT ERPOLA TED-iVALUE-,S--FOR~.-EVEN -3. 000 .-FEET ~ Of MEA5URED-DEPTH, ...................... ~ , MEASURE[:) ...... VE_R_T_!_¢ A L_ ............... SUB D EP.TH D [P.T.H S E A ........... TO TA~ ...... C_. OOR DI. NAT E 5 lO.OO 3. o0o_. 9 ,.6 · !.763. oo N 6~9_._00 E 2000 2000. ~946. 1763.00 N 6/+9.00 E 3_090 2_9~_8...._~74~-__ ~382.._~8 N 659.76 E ~000 3933. ...... 38.79. ............... 2064. ~8. N ............. 8~_7.8.6_E ~.0.00 ................. ¢638. .... A58~. ................... 266Z .~9 ...N ~6.0.QO 5~,3.5. 5~8,!. 3302.56 N ....................... 700_0 ............... , ........... 5855. 580~. ................. 3893..Z~. N %00.0_. 712~. 7070. 50~7.88_N__ .......................... 10.000 ....................... 7781. ..... 7727. 5605 '_ .............................. !1000 ..................... 8z~90. .......... 8~36.. .................. 6105 - · · ~ ............................. 8800 TVD HORIZONTAL VIEW ~ ......................... , ' '- '~ ................. 8400 * TMD~ II ,795 ATLANTIC RIC.FI~ .... ' ....................... DRILL SITE 9-8_.~ ............. ~ ........... MAGNETIC MULTI-SHOT SURVEY. RADIUS OF CURVATURE METHOD 7~oo ALL DEPTHS SHOWN ~ ARE TVD ................... ...................................... 6000 5600 4800 0 -- ; ..... 4000 ~ 3600 t ' ~ ~ .......... ~ ........... ~ ..................... ...... i ..... ; ........... ~. - ' i ........... : ! I - .400 : - ~ .......... ..................... . ..... VERTICAL .... SECTION ........ ' - : * DRILL SITE 9-8 ....... : - MAGNETIC MULTI-SHOT SURVEY_ 6~ RADIUS ~'OF -C-UR~ATURE 'METHOD 2800 ~ .............. { - -~ ........... ~200 .... ~ ~ . . _ .... . O~IB STATE of ALASKA DEPARTMENT OF NATURAL ,RESOURCES Divisien of Oil and Gas TO, [-- Jtoyle H. Hamilton Director x]f~l/v' Lonnie C. Smi th Chief Petroleum Engineer DATE : October 14, 1976 FROM: Harold R. Hawkins Petrol eu~.~ Inspector SUBJECT: Witness BOP test, DS 9-8, f',rco Section 36, TllN, Rl5E, UH Pe~i t No. 76-70 October 7, 1976 - I went to Prudhoe Bay to witness BOP test for Arco at DS 9-8. t'lhen I arrived at DS 9-8, the drilling crew were nippling up. They would have been ready for testing today, but found the annular pre- ; m ~d venter packer torn u~ where the piston closes it on backs~...e on ~eve!ed portion, and had to replace it. October 8, i976,3:30 AM - They started BOP test. The annular preventer was tested to 3000 psi OK. The upper pipe rams, the inside choke and inside kill and spool with 3" outlets and cameron valve were tested to 5000 psi OK. The inside choke was a ,~icEvoy valve, the rest of the valves are low torque haliburton valves. The check valve has a test valve on the top that can be opened to disable it which they have done. The next test was the lower pipe rams and outside choke and outside kill valve which were tested to 5000 psi OK. The check valve and six low torque ~inq valves were tested next to 50~,0 psi OK. One wing valve left was tested to 5000 psi. The test stem was pulled and the blind rams were tested to 5000 psi. The above tests were all good and located in the cellar. Arco now has a Koomey pump mounted on a trailer that cuts down quite a bit of testing time., as it pressures up what you are testing in about one eighth the time that the sprague pump would. There are 7 l~ torque wing valves on the manifold and one swaco superchoke that were tested to 5000 psi. There was a ball valve and dart valve on floor OK. The upper and lower kelly were also tested to 5000 psi and held OK. Ken Jones was operator for Arco. The master gauge on the accu.~ulator has 2950 psi. The nitrogen backup bottles have 2lDO, 2100, 2200, 2200 psi. All the controls on the ).~ster manifold are in good working condition. The accumulator bottles were all recharged and new bladders installed ~¢here needed since last BOP tests. The control panel on floor was operating in good order. The drill site is clean of debris, the pit well bermed. They have a steel fu,el tank that is not bermedo The well sign was not on loca- tion. Bill Co~don, assistant supervisor for Arco, said they would have the well sign up the first of next vmek. I filled out a field report and gave one to Ken Jones. Time 8:30 AM. In summary: I witnessed BOP test at Arco's DS9-8 and found all BOP eouipment in very good shape, plus the drill site and rig clean (with one exception - no ~'~ell sign on location). Attachment A11k. ~ 11 and Gas Conser'vati'b'i~""~'~'~ Field Inspection Report ..... Drqg, ~ Perm~.t No, ~7~-7~ Well/Platfm .Se~l //~Z4~-' ~'~' ~?':'~"Ope:rat°r~~ ,. . .~. Z-~~ ' RePresented bY~ff~ .... ~~y Name & Number ~ ~-~--~.- -', . .Sat'i sfactory rks filled Tests ). Wells SUSs~rface~No. 'Wel 1 s Well 'Test Data " Satisfactory Type Inspection Yes ' 'ON Item (;[() BOPE Tests ~) () 15. () 16. ( ) 17. Mas (')' 18, N'. 19. 20. Drill ing spool.- 21. Kill Line,(,t') ) ( 22. Choke Flowline ( ( ) 23. Choke Mani~fold No. valvs (-) 24. Chokes-i ) ( ) 25'. Test Plug,(.A')We!lhd( )cs! ( ) 26. Annular Preventer. ig , g (x) ,(, ,) ()oaPpe~(;)~pl ugaed (;1') n val've HCRvalve none 'i Dart e.aks'and/or.:equip, failures i~i.,i,cc~ ~'r}/.~' ~/;/4-.J No.t~fy ~n . .days o.r when ready.'... "Ins. pecte.d.by/Z//..~~~ ~a~'.' .,<~:."' ....... . .' ".;:. ' ...... · .. .... ', .. ::'...' ,'" ... :.:', .]...' ,".' ',.,'; ' -.' ' : · '.,.:.' .' ' .. . ".... ',.,: :':,.~ ~.,.. ; .'.' · ..'. · '.' · · . ' .. ., ' · . '. . . '.' .': :i'.:. : "' ,.'.' ' '. ~' ..' BP ALASKA INC. State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 P.O. BOX 4-1379 3111 -C-STREET ANCHORAGE, ALASKA 99503 TELEPHONE {907) 279-0644 September 14, 1976 SEC CONFER: FILE; Attention: Mr. Hoyle Hamilton Acting Director Gentlemen: Drill Site 9-8 (33-36-11-15) Prudhoe Bay Field We have reviewed a copy of Atlantic Richfield Company's Application for Permit to Drill the subject well from a surface location of 1816'N and 24'W of the SE corner Sec. 2, T10N, R15E, UPM to an 8800' subsea target 1320'N and 1450'W of the SE corner, Sec. 36, TllN, R15E, UPM. We understand the well is projected to be 1299' west of BP Alaska Inc., lease ADL 28343 at TD. BP Alaska Inc.,being the affected operator as per Paragraph 22.050, Title II, Part 3 of the Alaska Administrative Code, has no objection to the drilling of this well. Very truly yours, BP ALASKA INC. Manager Operations GDT:jle cc: Atlantic Richfield Company File: DEV-PB-072/2 September 22, 1~76 Re: Prudhoe Bay DS ~-8 (33-3'5-1t-15) Atlantic Richfield Company State Permit No. 75-70 C. R. Kno~les District Ortlltng Engineer Atlantlc Richfield Company P. O. Box 350 Anchorage, Alaska ~9510 Dear Sir: Enclosed is the approved appllcatlon for permit to drltl the a~ve referenced well at a location In Section 36, Township liN, Range 15E, Well samples, core chips and a mud log are not required. A dlrectlonal survey Is required. Many rivers In Alaska and their drainage systems have been classlfled as. Important for the spa~nlng or migration of anadromous fish. Operations Tn these areas are subject to AS 15.50.870 and the regulat:lons promulgated thereunder (Tltle 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat CoordtnatorWs office, Depart- merit of Fish and Game. Pollution of any waters of the State Is prohibited by AS q6, Chapter 03, Article 7 and the regulations promulgated thereunder (Tttle 18, Alaska Administrative Code, Chapter 70} and by t~ Federal Water Pollution Control Act, as amended. Prior to con~aenclr~j operations you may be contacted by a representative of the Department of Envlrormental C~servation. Pursuant to AS 38.qO, Local Hire Under State LeaSes, t~ Alaska Department of Labor Is belng notified of the issuance of this permit to drill. To aid us In scheduling field work, we would appreciate your notifying this office wlthln q8 hours after the well is spudded. We ~Id.also like robe ~tified so that a representative of the Olvisionma¥ be preset to wttness testing of blo~out preventer equipment before surface casing shoe is dritled. C. R. Knowles -2- ~pt~mber 212, 1976 tn the event of suspension or. aban~t please give this office ~~te advance notification so that we may have a witness present. Very truly yours. Hoy I e H. Haml I ton I~ember Alaska O11 and Gas C:onservatlon Committee Enclosure cc: Oepartment of Fish and Game, Habitat Section w/o encl. Oepartment of Enviro~ntal Conservation w/o encl. Oepartment of Labor, Supervisor, Labor Law C~11ance Olvlslon w/ encl. AtlanticRichfieldCompany North America;' °roducing Division North Alaska L Post Office 13o× 360 Anchorage, Alaska 995'10 Telephone. 907 277 5637 September 1, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99504 Subject: Drill Site 9-8 (33-36-11-15) Dear Mr. Hamilton: The following items are enclosed for the Drill Site 9-8 well: , Application for Permit to Drill along with a $100.00 filing fee. 2. Surface Location Plat. For your information, as well as for the State Department of Labor, the surface location is on Lease ADL 28327 and the target location is on Lease ADL 28324. The effective date of these leases is October 1, 1965, with a termination date of March 27, 1984. Very truly yours, .R. Kn District Drilling Engineer /cs Enclosures Form 10-401 SUBMIT IN TRIPI 'E REV. 1-I-71 (Other instructio. re~¢,se~de~ ~ AP! No. 50-029-20230 la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DRILL [~ DEEPEN [--] b.TYPE OF WELL OIL GAS SINGLE MULTIPLE 2. NAME OF OPERATOR Atlantic Richfield Company 3. ~r~RESS OF OPERATOR P. O. BOX 360, Anchorage, Alaska, 99510 4. LOCATION OF WELL At surface 1816'N & 24'W of SE er Sec 2, T10N, R15E, UM At proposed prod. zone 1320'N & 1450'W of SE er Sec 36, TllN, R15E, UM . 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 6-1/2 miles northeast of Deadhorse,. Alaska. 6. LEASE DESIGNATION AND SERIAL NO. ADL 28324 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT EARM OR LEASE NAME Prudhoe Bay 9. WELL NO. DS 9-8 (33-36-11-15) t0. FIELD AND POOL, OR WILDCAT Prudhoe Bay-Sadlerochit Pool 11.SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 36, TllN, R15E 12.. 14. BOND INFORMATION: Wn, E Statewide Surety and/or No. Federal Insurance Co. 15. DISTANCE FRONI PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (.-Mso to nearest drig, unit. ii' any) 1299' 18. DISTANCE FROM PROPOSED LOCATION IO NEAREST WELL DRILLING, COMPLETED, OR APPLIED }"OR, FT. 2900' 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 21' Pad Elevation (Gravel) 8011-38-40 16. No. OF ACR~ IN LEASE 2560 19. P~OPOSEDDE~.' 12,105'MD 9,184'TVD ~ount $100,000.00 17. NO.ACRES ASSIGNED TO THIS WELL . ... -.~-,,t,. 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START 23. PROPOSED CASING AND CEMENTING PROGRAM . October .14, .1976 SX SIZE OF HOLE SIZE OF CASING WEIGtIT PER FOOT GRADE SETTING DE~H ~antity of cement · . .. 32" 20" 94# g-40 100'+ Circ to surf approx..500 sx . i7-1/2" .. 13-3/8" 72# FIN-80 2770'~ Circ to surf approx 5500 sx ~ . . 12-1/4". ..9-5/8" 47# .1~I-80 11265'+ +2500' cmt colm on 1st st~ .+150.0 & S00,95 -- ~00' cmt co]m on 2nd stg. +125 mw 8-1/2" 7;' _'i.'29#_ N-80 11970'+ 1100'+ thru lad 300 sx + -- Atlantic Richfield Company proposes to directionaily drill this well to 12,19i'MD~, 9184'TVD+ to produce the Sadlerochit zone. Logs will be run across selected intervals. A 20-3/4" 2000 psi Hydril will be used on the 20" conductor. A 13-5/8"~000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/~" casing. The BOP equipment will be pressure tested each week and operationally tested each trip. .A string of 5-1/2" 17# N-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. The packer will be set above'the Sadlerochit. The well will not be perforated at this time. A non-freezing fluid will be left in all uncemented annuli Kihtin the permafrost interval. Request the 13-3/8" casing be_set at 2770' to place the shoe in a more o ' . N roduc iv a exists a o~e th 27~0' . ~&~A~D~&~~~DeRU~R~i:ltpropo~,sto~e~edataonpresentpro~ctivezonean~mposeB MD setting point new productive zone. If propel is to d~ or deepen d~ecfion~y, ~ve pertinent da~ on subject lo~tions ~d measured and ~ue vertiml depths. Give bJowout preventer pro. am. 24~ ~I.p.,~ ' ~ertifyJ~llt t~ Foregoi~ is True and Co'ct _ I SlC~'~'~f~/J~~-~-~--*~ ~'~/---~ DA~ September 1, 1976. nTLE Dist. Drim. Engineer (This space ~ State offi u~)) [ ' ': ~NDITIONS OF APPROVAL, IF ANY: SAMPLES AND CORE CIIIPS REQUIRED I MUD Loo ! [] yes 7~ NO 1, [] YES 7~ No DIRECl]ONAL SURVEY REQUIRED ~¥ES [] NO OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE 50-029-20230 PERMIT NO. 76-70 APPROVAL DATE APPOVED BY '~ ~ , TITLE Member ., *See Instruction On ReYerse Side September 22, 1976 DATE September 22, 1976 SEOTION SECTION I SECTION ! I SECTION 12 CERTIFICATE OF SURVEYOR ~ HEREBY CERTIFY THAT I AM PROPERLY REGISTERED ,.0,,'WD LICE,",'SED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. DATE OF SURVEY AS BUILT CtjEJ.~L ~,~'C"C~ u W:- ' No. 7 L,~.,.,,~." 70°14'52.613'' Y 5 943 399.:::>4 LONG. 148°14'!0 146" X 718:515.12 WELL No. 8 LAT. 70°14'51.450" Y 5 943 2~82.76 LONG. 148014'09.455" X 718:54:5.04 WELL No.9 LAT. 70°14'50.504'' Y 5945 i65.96 LONG. 148°t4'08.723'' X 718 370.86 EXISTING WELL OR CONDUCTOR PiPE REVISION CKD ARCO No. HVL No. 35-DS9-76 ATLANTIC RICHFIELD C°. AS BUILT DRILL SITE No.9 WELLS No. 7'8 & 9 LOCATED IN PROTRACTED SECTION 2, T. ION...~ R.15E.,U.M. PREPARED BY HEWITT V. LOUNSBURY & ASSOC' 723 Vl. 6th AVE., ANCHORAGE, ALASKA DATE' __LB._ JUNE 76 CHKD BY GD SCALE =i = 2_00 , ~ FIELD BK=Lo.0,SE LEAF AtlanticRichfieldCornpany North Americm~ Producing Division North A~as~- ,rict Post Office ~-~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 25, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources D~vision of Oil and Gas 3001 Porcupine Dr~ve Anchorage, AK 99504 Subject: Dr~ll Site 9-8 (33-36-11-15) Dear Mr. Hamilton: The follow~ng items are enclosed for the Drill Site 9-8 well: , Application for Permit to Drill along with a $100.00 filing fee. 2. Surface Location Plat. For your information, as well as for the State Department of Labor, the surface and target location are on Lease ADL 28324. The effective date for this lease is Octcber 1, 1965, with a termination date of March 27, 1984. Very truly yours, C. R. Know].es' District Drilling Engineer /CS Enc].osures Form 10-401 REV. 1-1-71 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN OTHER la. TYPE OF WORK DRILL [~] b. TYPE OF WELL OIL [~ GAS[---] WELL WELL SUBMIT IN TRIP.. (Other instruction~n reverse side) 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR DEEPEN SINGLE ZONE [] MULTIPLE ZONE F. O. Box 360: Anchorage, Alaska, 99510 -. 4. LOCATION OF WELL '\ At surface ~ 1933'N & 49'W of SE cr Sec 2; T10N, 15E, At proposed prod. zone ~, 3320'N & 1450'W of SE c.r Sec 3 Tll E, UPI 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OiF~C_E* . ,. Approximately 6-1/2 mile.~; northeast of ~Deadhorse, Alaska. 14. BOND INFORMATION: : ~. . TYPE Statewidesuretyand/orNo. Federfil ~nsurance Co. 8011-38-40 15. DISTANCE FROM PROPOSED* ! ~,. /' 16. No. OF ACRES IN LEASE LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. ] 320' t ~"-" " (Also to nearest drig, unit, if any) I I 2560 18, DISTANCE FROM PROPOSED LOCATION "~. t [19. PROPOSED DEPTH TO NEAREST WELL DRILLING, COMPLETED, ~ ~ [ 12,105 OR APPLIED FOR, FT. - 2900' ~\~., I 9,18~.,~v~ 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 21' Pad Elevation (Gravel) 6. LEASE DESIGNATION AND SERIAL NO. ADI, 282,24 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Frudhoe Bay 9. WELL NO. DS 9-8 (33-36-11-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay-SadlercchJt Pcol 11.SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 36, TllN, R15E 12. Amoun~ $!00,000.00 17. NO.ACRES ASSIGNED TO THIS WELL 320. 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK ~LL START October 14, 1976 23. PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DE?TH Quantity of cement 32" 20" 94# H-,40 100'+ Circ to surf ao~rox 500 ]7-1/2" 13-3/8" 72# M}~-8O 2700'+ Circ to surf ~nnrox ~,500 sx ~.2-1/4 9-5/8" 47# MN-,80 11000'+ +25.G0' emt cn],,mn mn ]~V ~V, +15( & SO0-95 -- -~00' cmt colm on 2nd stg 8_1/2', 7,, 29# N-80 11890'+ 1100'+ thru ].ap 300 ~4x+ -- Atlantic Richfield Company proposes to directiona].ly drill this well to 12,105'MDq_-, 918~'TVD+_ to produce the,. Sadlerochit zone. Lcgs will be run acrcss selected interva].s. A 20-.3/4" 2000 psi Hydril will be used on the 20" conductor. A 13-3/8" 5000 psi Hydril and. 13-3/8" 5000 psi pipe and blind rams will be used on the,. 13-3/8" casing. The BOP equipment will be Fressure tested each week and. operationally tested each trip. A strSng cf 5-1/2" 17# N-80 tubSng, packer and v_ecessary provisions for subsurface safety equipment will be run. The. packer will be set. above the Sadlerochit. The well will not be perforsted at this time. A non-freezing fluid will be left in all uncemented anr. uli within the Fermafrost interval. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen direcfionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer program. SIGNED24' I hereby certify ~he.~. ,/~.~a~'~F°reg°ingtis True and Cq~ect (This space for State office use) CONDITIONS OF APPROVAL, IF ANY: Dist. Drlg. En.gineer ?~TLE SAMPLES AND CORE CHIPS REQUIRED [] YES ~$O DIRECTIONAL SURVEY REQUIRED ~,YES [] NO MUD LOG [] YES NO OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE - o g- £ PERMIT NO. 7~ -- ~70 APPOVED BY APPROVAL DATE TITLE DATE *See Instruction On Reverse Side NEW WELL PERHITS . . I-s the permit fee attached ....... Is well to be located in a defined pool . . .' ..... '.. Lease & Well No. Yes No Remarks . Is a registered survey plat attached . . Is well located proper distance from property line ..... . .... _ Is'well located proper distance from other wells ..... Is sufficient undedicated acreage avai.lable in this ~ool . _ Is well to be deviated ................. ~/~o~ Is operator the only affected party ..... . ........... . Can permit be approved before ten=day wait ............ /d~o/< _ Does operator have a bond in force . . ' .A~K-_ . Is a conservation order needed ................... l( ,~ _ Is administrative approval needed _ Is conductor string provided .................... - Is enough cement used to circulate on conductor and surface . Will cement tie in surface and intermediate or production strings ,. i.lill cement cover all known productive horizons ........ '_ Will surface casing protect fresh water zones ........... i. Will all casing give adequate safety in collapse, tension & burst t. Does BOPE have suffic'ient pressure rating !d~t~onal Requirements: ,/ Ao6~ ,'~','~ ~-~t;v ~ ~-o~a l ne~'~ ,/ ~z;~ ~e ~ ~r~¢e ca~,'~. ~ Approval Recommended · Geol og~,, Enaineerinm' TRM HWK ~~ OKG HHH JAL .' ~LCS JCM Revised 1~15/75 .-