Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-161
PBU F-27B Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 210-161 50-029-21659-02-00 12227 9046 2660 9703 929 1080 1833 12227 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9046 34 - 2694 31 - 9734 9490 - 10419 9491 - 10571 10394 - 12227 34 - 2694 31 - 8454 8258 - 8985 8258 - 9053 8966 - 9046 10394 None 5020 6870 7240 10160 11200 9764 - 12227 4-1/2" 12.6# L80 28 - 9540 8478 - 9046 78 20" 35 - 113 35 - 113 4-1/2" TIW Packer 9434, 8212 9434 8212 Torin Roschinger Area Operations Manager Kirsty Glasheen Kirsty.Glasheen@hilcorp.com 907.564.5258 PRUDHOE BAY, PRUDHOE OIL ADL 0028280 28 - 8298 N/A N/A 333 386 31165 27191 30 30 350 1750 1000 1040 N/A PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.15 11:10:46 -08'00' Torin Roschinger (4662) By Grace Christianson at 12:42 pm, Jun 15, 2023 MGR30JUN2023 DSR-6/15/23 ACTIVITY DATE SUMMARY 4/1/2023 ****WELL FLOWING ON ARRIVAL****(Patch tubing liner) TB LOADED TBG w/ 186BBLS CRUDE DRIFTED TO 9,900' SLM w/ 3 1/2" BLB & 2.75" GAUGE RING. SET LTTP @ 9,491' MD (Test failed) SET 2.81" X SELECTIVE TEST TOOL @ 9,510' MD(Test failed) ***CONTINUED ON 4/2/23 WSR*** 4/1/2023 T/I/O = 2400/357/0 Temp= 90. (TFS Unit 4 Assist SL with Load and Test) Pumped 2 bbls of 60/40 followed by 39 bbls of Crude down FL for Freeze Protect. Pumped 186 bbls of Crude down TBG for Load. SL Set Plug x2 and pumped 35 bbls of Crude down TBG in attempt to reach test pressure. SL to set plug in 4.5 TBG and re test. ***WSR Continued on 04/02/2023**** 4/2/2023 ****WSR Continued from 04/01/2023*** (TFS Unit 4 Assist SL with Load and Test) Pressure tested TBG to 1000 psi. TBG showed significant pressure loss. Pumped 16 bbls of Crude down TBG while SL ran D and D Hole Finder, Pulled and Set Valves. ****WSR Continued on 04/03/2023***** 4/2/2023 ***CONTINUED FROM 4/1/23 WSR***(Patch tubing liner) SET 3.81" PX & PRONG AT 9,475' MD TB ATTEMPTED 1000PSI MIT-T (Failed) IDENTIFIED LEAK IN ST #6 (5,058' MD) w/ D&D HOLEFINDER SET WHIDDON CATCHER ON P-PRONG AT 9,475'MD PULLED RM-OGLV AT ST #6 (5,058'MD) ATTEMPTED TO SET NEW RM-OGLV & DROP VALVE RATTLE GLM'S w/ LOOSE 4 1/2" BLB & 2 1/2" GAUGE RING PULLED WHIDDON @ 9,475'MD(Recovered dropped valve) SET 4 1/2" BAITSUB,3.60" BELLGUIDE & GUTTED JD ON P-PRONG @ 9,475' MD. ***CONTINUED ON 4/3/23 WSR*** 4/3/2023 *****WSR Continued from 04/02/2023***** (TFS Unit 4 Assist SL with Load and Test) Pumped 190 bbls of Crude down TBG to Assist SL with Load and Test. ****WSR Continued on 04/04/2023**** 4/3/2023 ***CONTINUED FROM 3/2/23 WSR*** (Patch tubing liner) SET NEW RM-OGLV AT ST #6 (5058'MD) PULLED BAITED P-PRONG & PX PLUG BODY AT 9,475' MD TB RE-LOADED TUBING w/ 186BBLS CRUDE SET 3.81" PX PLUG AT 9,475' MD ***CONTINUED ON 3/4/23 WSR*** 4/3/2023 T/I/O = 1700/1560/10. Temp = SI. T & IA FL (slickline req). No AL. IA FL @ 3580'. T FL @ 5058' (sta #6 SO). Slickline in control of well upon departure. SV, SSV, MV = O. WV = C. 17:30 Daily Report of Well Operations PBU F-27B Daily Report of Well Operations PBU F-27B 4/4/2023 ***CONTINUED FROM 4/3/23 WSR*** (Patch tubgin liner) SET P-PRONG IN PX AT 9,475' MD TB ATTEMPTED MIT-T (Failed, 1050psi loss in 15min) SET 4 1/2" X SELECTIVE TEST TOOL IN SLIDING SLEEVE AT 9,361' MD TB PERFORMED MIT-T(Passed) PULLED X SELECTIVE TEST TOOL AT 9,361' MD PULLED PRONG & PX PLUG BODY AT 9,475'MD BRUSH NIPPLE AT 9,475' MD w/ 4 1/2" BLB & 3.80" GAUGE RING. RE-SET PX PLUG & PRONG @ 9,475' MD TB ATTEMPTED MIT-T(Failed, 1683psi loss in 15min) RAN 4 1/2" D&D HOLEFINDER TO PX PLUG @ 9,475' MD ***CONTINUED ON 4/5/23 WSR*** 4/4/2023 ***WSR Continued from 04/03/2023**** (TFS Unit 4 Assist SL with Load and Test) ***MIT-T PASSED **** (above SS) Max Applied Pressure=2100, Target Pressure=1800. Pumped 1 bbl of Crude down TBG to reach max applied pressure of 2100 psi. 1st 15 Min TBG lost 115 psi. 2nd 15 min TBG lost 22 psi. TBG lost 137 psi in a 30 min test. SL pulled plug, did not return Fluid. Pumped a total of 50 bbls Crude down TBG to Assist SL with Multiple TBG pressure tests to troubleshoot leak. *****WSR Continued on 04/05/2023***** 4/5/2023 ***CONTINUED FROM 4/4/23 WSR***(Patch tubing liner) RAN 4 1/2 D&D HOLEFINDER, WORK UP FROM PLUG TO ABOVE SLIDING SLEEVE (Inconclusive, element missing) DRIFTED w/ 4 1/2" BLB,3.78" GAUGE RING TO P-PLUG @ 9,475' MD ***WELL S/I ON DEPARTURE, NOTIFY DSO OF WELL STATUS*** 4/5/2023 *****WSR Continued from 04/05/2023**** (TFS Unit 4 Assist SL with Load and Test) Pumped 6 bbls of Crude down TBG while SL ran D and D Hole finder. SL in control of well upon departure. Final WHPS=500/945/20 4/7/2023 T/I/O = 270/950/10. Temp = SI. T & IA FL (Eline). No AL. T FL near surface. IA FL @ 3670' (1388' above sta # 6 SO, 197 bbls). SV, WV, SSV = C. MV = O. IA, OA = OTG. 22:00 4/9/2023 T/I/O/ 225/944/0 Temp=S/I. Unit 4 assist E-Line (LDL) Pumped a total of 5.4 bbls to maintain between 1700psi to 1900psi for on the TBG for LDL. Established a liquid leak rate of 4.2 gal a min. Final WHPS 245/942/0 4/9/2023 *** WELL SI ON ARRIVAL *** INITIAL T/I/O = 225/950/0 MIRU YELLOWJACKET ELINE, READ LEAKPOINT TOOLS, AND THUNDERBIRD PUMPING FOR LEAK DETECT LOG. FIND LEAK AT 9436 FT IN PACKER, CONFIRM W/ STOP COUNTS LEAK RATE - 4.2 GPM. 4.4 BBL AWAY TOTAL. FINAL T/I/O = 295/944/0 WELL SI ON DEPARTURE, DSO NOTIFEID. *** ELINE COMPLETE *** Daily Report of Well Operations PBU F-27B 4/20/2023 ***WELL S/I ON ARRIVAL*** (patch tbg / liner) PULLED P-PRONG f/ PX PLUG BODY @ 9475' MD RAN 10' x 2-1/2" P-BAILER TO PLUG BODY @ 9475' MD (recovered bailer full of plastic coated tbg & several chunks of dd element) LATCHED PLUG BODY @ 9475' MD & SHEARED GR ***JOB SUSPENDED, WELL LEFT S/I, DSO NOTIFIED*** 4/21/2023 ***WELL S/I ON ARRIVAL*** (patch tubing/ liner) RAN 10' x 2.5" P-BAILER TO PX PLUG BODY @ 9475' MD (recovered approx 1 gal plastic tbg & several chunks of element rubber) PULLED 3.81" PX PLUG BODY @ 9475' MD DRIFT TBG w/ 20' x 2.70" DMY WHIPSTOCK, DMY 35KB DRIFT, 2.74" TAPERED SWAGE (26' OAL) UNABLE TO PASS 9626' SLM DUE TO FILL / DEBRIS NO PUMP AVAILABLE FOR BRUSH & FLUSH ***JOB SUSPENDED, WELL LEFT S/I, DSO NOTIFIED*** 5/16/2023 ***WELL S/I ON ARRIVAL*** ATTEMPTED TO SET 4 1/2" PX PLUG BODY, S/D @ 9,434' SLM (asphaltenes in x- line & plug) RAN KJ, 4 1/2" BLB, 3.80" GAUGE RING S/D @ 9,434' SLM RAN KJ, 4 1/2" BLB, 3.50" GAUGE RING S/D @ 9,440' SLM (pulling heavy) RAN KJ, 3.50" CENT. 1 3/4" SAMPLE BAILER S/D @ 9,467' SLM (recovered 1 cup of asphaltenes) RAN KJ, 3 1/2" BLB, 2.35" GAUGE RING S/D @ 9,471' SLM (sticky) ***CONTINUE 5/17/23*** 5/17/2023 T/I/O= 2500/900/0 (Assist Slickline) TFS U-3, Pumped 6 bbls DSL and 138 bbls Crude for TBG load per SL. Pumped another 80 BBLS crude to Assist SL. FWHP=0/900/0 SL still on well upon departure. 5/17/2023 ***CONTINUE FROM5/16/23*** RAN 3-1/2" BRUSH & 2.35" GAUGE RING, WORKED DOWN TO DEPLOYMENT SLEEVE @ 10,394' MD WHILE THUNDERBIRD PUMPED CRUDE BRUSHED X NIPPLE @ 9,475' MD, 2 RUNS 3.5" GAUGE RING THEN 3.80" GAUGE RING, ALL CLEAR B&F 3-1/2" BRUSH & 2.80" GAUGE RING TO XO @ 9,543' MD B&F 3-1/2" BRUSH & 2.74" GAUGE RING TO DEP SLEEVE @ 10,394' MD DRIFTED w/ 30' PATCH DRIFT (max od = 2.73", oal = 29.9') TO 9,900' SLM DRIFT W/ 10' X 1.75" BAILER TO DEVIATION @ 10,540' SLM RAN HES JEWELRY LOG FROM DEVIATION @ 10,550' SLM TO SURFACE ***CONTINUE ON 5/18/23*** 5/18/2023 ***CONTINUE FROM 5/17/23*** RAN HES JEWELRY LOG FROM DEVIATION TO SURFACE ***RIG DOWN, PAD OP BACK FLOWING WELL*** 5/20/2023 ***WELL S/I ON ARRIVAL*** ATTEMPTED TO SET 4-1/2" PX-PLUG BODY @ 9,475' MD (asphaltines in x-line) ***CONTINUE 5/21/23*** Daily Report of Well Operations PBU F-27B 5/21/2023 ***CONTINUE FROM 5/20/23*** SET 4-1/2" PX PLUG @ 9,475' MD (confirmed w/ checkset) FLOW TEST WELL FOR 3 HOURS (2mmscf, no fluid) PULLED 4-1/2" PX PLUG FROM 9,475' MD ***WELL S/I ON DEPARTURE*** 5/27/2023 T/I/O = 2306/336/0 Temp S/I. TFS unit 4 assist E-Line. Pumped 145 bbls of crude down the TBG to assist E-Line getting down hole. E-Line was not able to get to desired depth. Final WHPS 312/337/0 5/27/2023 *** WELL SI ON ARRIVAL *** INTITIAL T/I/O = 2400/0/300 RIH W/ PATCH, #10 SETTING TOOL SLOW CHARGE, CCL/GR, WEIGHT BAR. SET DOWN 12' INTO XO AT 9555' (XO 9543') OVERPULL 800 TO GET FREE. DISPATCH PUMP TRUCK AND FLUIDS. PUMPED 145 BBL CRUDE TO PERFS, MADE SECOND ATTEMPT TO RUN IN THROUGH XO, SAME RESULT. POOH AND REGROUP. SDFN. FINAL T/I/O = 400/0/300 WELL SI. *** JOB IN PROGRESS *** 5/29/2023 *** CONTINUED FROM 28 MAY 2023 *** INITIAL T/I/O = 700/0/280 MAKE UP PATCH W/ TURNED DOWN BAKER #10 SETTING TOOL AND 1-11/16" SHOOTING GR. SET PACKER AT 9811' MID ELEMENT, CCL-ELEMENT = 33.2', CCL STOP = 9777.8'. PUTS SNAP LATCH RECEPTACLE AT 9789.7', WLEG AT 9814.8'. LINE TENSION, 1580/1450 LB, SLACKED OFF ONTO PKR AFTER SETTING, RELEASED CLEAN, 40 SEC. ELINE COMPLETE. SSV CLOSED. FINAL T/I/O = 0/0/280 *** WELL SI ON DEPARTURE, DSO NOTIFIED *** 5/29/2023 T/I/O=744/325/0 Assist E-Line TFS(U-3) Pumped 150 BBLS crude to Load TBG turned well over to E-Line. FWHP=0/325/0 6/4/2023 ***WELL S/I ON ARRIVAL*** RAN 2.35" CENT, 3' x 1-1/4" STEM, 2.50" CENT, 2.50" LIB TO SNAP LATCH RECEPTICLE @9,774' SLM SET Northern Solution 350-272 PACKER w/ SEAL BORE LATCH (oal = 30.46', max od = 2.72", min id = 1.81") IN LOWER PACKER @9,774' SLM RAN 4.5" GR, 45KB PACKER DRIFT (20' OF SPACE PIPE & PTSA) W/ TATTLE TALE TO DEPLOYENT SLEEVE @9,491' MD PINS SHEARED, GOOD NOGO MARKS ***WSR CONTD ON 6/5/23*** 6/4/2023 T/I/O=100/300/0 (Assist slickline) TFS U-3. Standby for slickline *Job continues to 6-5- 23* ELINE COMPLETE SET PACKER AT 9811' MID ELEMENT, CCL-ELEMENT = 33.2', CCL STOP = 9777.8'. PUTS SNAP LATCH RECEPTACLE AT 9789.7', WLEG AT 9814.8'. MAKE UP PATCH W / TURNED DOWN BAKER #10 SETTING TOOL AND 1-11/16" SHOOTING GR Daily Report of Well Operations PBU F-27B 6/5/2023 ***CONTD FROM 6/4/23*** SET LOWER NS LTP ASSEMBLY (QCLL, SPACER PIPE, AND PTSA W/ 2.31" X NIPPLE & RSG PLUG) IN DEPLOYMENT SLEEVE @ 9,491' MD. SET NORTHERN SOLUTIONS MONO-PAK NSAK 450-368 LTP @ 9,553' SLM T-BIRD ATTEMPT TO TEST LTP (fail) SET TEST PLUG IN TOP OFF LTP ASSEMBLY T-BIRD ATTEMPT TO TEST (fail) ***APPEARS THAT TOP OF PACKER IS IN LARGER OD IN TIW SEAL ASSEMBLY*** PULLED TEST TOOL PULLED 2-7/8" RSG PLUG FROM PTSA SET 4-1/2" SLIP STOP CATCHER @ 5,100' SLM PULLED RM-LGLV FROM ST#7 @ 2,985' MD PULLED RM-OGLV FROM ST#6 @ 5,058' MD SET RM-DGLV IN ST#7 @ 2,985' MD. T-BIRD TO LOAD IA W/ 280 BBLS CRUDE. ATTEMPT TO SET RM-DGLV IN STA# 6 @ 5058' MD. ***WSR CONTINUED ON 6-6-23*** 6/5/2023 *Job continues from 6-4-23* (Assist Slickline) TFS U-3. Pumped 7.5 bbls of crude down the TBG to pressure up against LTP. Pumped 7.5 bbls bbls down TBG to test LTP. Pumped 5 bbls crude to establish LLR of 1500 psi at 0.4 BPM and 0.4 BPM at 1700 psi. Pumped 280 bbls of crude down the IA to load for an MIT-IA. *Job continues to 6-6-23* 6/6/2023 ***WSR CONTINUED FROM 6-5-23*** SET RM-DGLV IN ST#6 @ 5,058' MD PULLED UPPER SECTION OF LTP FROM 9,420' SLM (missing one element) RAN 3.50" 3 PRONG WIRE GRAB TO TOP OF LOWER LTP ASSEMBLY @ 9,446' SLM (no recovery) RAN 2.25" 3 PRONG WIRE GRAB TO TOP OF STRADDLE PATCH @ 9,748' SLM (no recovery) T-BIRD LOADED TBG w/ 180 bbls CRUDE T-BIRD PERFORMED PASSING MIT-IA TO 1500 psi SET 31.25' MIDDLE SECTION OF NS LTP ASSY @ 9,449' SLM SET 17.26' UPPER NS LTP ASSY @ 9,417' SLM ***WSR CONTINUED ON 6/7/2023*** 6/6/2023 *Job continues from 6-5-23* (Assist slickline, MIT-IA) TFS U-3. Pumped 180 bbls Crude down TBG to load. Pumped 25 bbls crude down the IA to MIT-IA MAP@1500 psi. First 15 minutes IA lost 100 psi. Second 15 minutes IA lost 25 psi ***PASS***. Bled down IA to starting pressure. *Job continues to 6-7-23* 6/7/2023 ***CONTINUED FROM 6/6/2023*** SET 2.31" XX PLUG IN PTSA @ 9481' SLM (ISSUES GETTING DOWN). PT TBG 1000 PSI AGAINST XX PLUG (FAILED). PULLED XX PLUG FROM 9481'' SLM (RUBBER CHUNKS AND PLASTIC COATING IN PLUG). SET QCLL TEST TOOL IN MONO-PAK PACKER @ 9396' SLM (GOOD PT 1000 PSI AGAINST PACKER ELEMENT). SET 2-7/8" XX PLUG, IN LTP 2.31" X-NIP @ 9,481' SLM ATTEMPT TO MITT 1500 PSI (Failed 3 tests) PULL 2-7/8" XX PLUG IN LTP 2.31 X-NIP @9,481' SLM RUN HES 24 ARM CALIPER FROM 9,650' SLM TO SURFACE. ***CONTINUED ON 6/8/2023*** Daily Report of Well Operations PBU F-27B 6/7/2023 *Job continues from 6-6-23* (Assist Slickline) TFS U-3. Pumped 13 bbls of crude down the TBG to test against LTP, TBG not holding pressure *See Log*. Bled back 1.6 bbls to starting pressure Slickline left in control of well upon departure 6/8/2023 *** CONTINUED FROM 6/7/2023*** R/D POLLARD UNIT #59 ***WELL S/I ON DEPATURE*** STATE OF ALASKA • 0LASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program �❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: O 1 13 P LV 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 210-161 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21659-02-00 7. Property Designation(Lease Number): ADL 0028280 8. Well Name and Number: PBU F-27B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: t PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12227 feet Plugs measured 10338 feet true vertical 9046 feet Junk measured feet J U L 2 5 2016 Effective Depth: measured 10338 feet Packer measured 9434 feet true vertical 8923 feet Packer true vertical 8212 feet OGC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"Conductor 35-113 35-113 Surface 2660 13-3/8"68#L-80 34-2694 34-2694 5020 2260 Intermediate 9705 9-5/8"47#L-80 31 -9736 31 -8456 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9764-9804 feet feet 10401-12227 feet True vertical depth: 8478-8510 feet feet 8971-9046 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"TIW Packer 9434 8212 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED yy JAN S f-17,�,,_4 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 348 26689 23 440 1077 Subsequent to operation: Shut-In 340 800 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature � 6.......................---..........-_ Phone +1 907 564 4424 Date 7/25/16 Form 10-404 Revised 5/2015 ,4fii ` i` RBDMS vv JUL 2 6 2016 Submit Original Only • • • m cn a, 000 ,, 00 (Oa ; 0 C N m in K.v (m) 0 O 0a0 N N N Tr T- 00 O O T CO M Tr CO O O M O co O) O O O Ln T CA CO Tr O) M O O M N N CO CO CO CA O) co G H O O) O (O O T- O O O CO (A T- 01 M M N N M C)) N M O O CO CO _ _ a) M a M V N 0 T- (O I� O O O N M O . N CD O CA C.) o • CO Q M1 T- a- M coCD CA CD co r • W CL " COO COo O O cOD Qa U J CO 5 J J0 J J y13 � kJ *k 4t OD N CCON- 4# Oc0 . *k • N •0 N U 0O QO N 00 A' N U _ a° - p co in N co A C� M N 4 M 4 J= ▪ ON- L0O C COON QI J cN w c co GO o ' U ww ✓ C) LL 0C Et c GC oC Z Z Z o W W w W w m m 0D1" ZZZZ DJ 0 (n Z J J J J I- H 0 0 > 0 o L / - < k f E = o / ƒ _o Tii\ o CO q CL 2)/ 0 -o £_ / _ 0 - 6 2 < b < @ = I5 q / \ o � w 0 -5 I- to 2w ƒ = t b_ & 2 w b Lo 2 5 2 0 L < & N % w o 2 0 Q ~ ® m % 6 ■ 2 x0E W � h k wq � I- .- -- , \ tem [ ' w � c) 2 E IX < 0 E ■ < _ ' m _ E m ©D. ,_--- O z 8 _N. � owl-- •- / - I- O � / _1 < W"Zi co / / -J 2 \ � ~ / z \ TD U. k $ c) S i k < 10 -| E 8-z0 < 0 U. ° 01 - , < = 00- 1:t = an d \ o 6 E _0 7- , 0 = m o c 2 0 « 02 _ƒ e O \ / x -1Qo.� -Jb �� 11 t.1 03 k « < 2 $ 9 I (Du_ s- w U 0 H b a . -> _1 $ - c � \ 2aa| _J0 _ W * ® (/) IX 02 - w + � © % / k -1 tr / � z ® 22 _1DCD (927 \ » o Om < 2 w & < o ? % w < O § « 2 EL / b CU ƒ 2 2b � a2 \ OreE « k / 0 = pec < 0 qcz % / & / Xa5 £ � S / k0 2a a2R « � 2 � � K \ 2S2 \ \ 6a_ z0 b / 22 / / ƒ / 2 % 2 � / � L , e Cl) - - 2 m - « - ct 5 o a 0 a) Z o ƒ 2 - / $ 0 O Cr c - w LL O & m o w & & ww < u_w .01� \ ± RROaw � a) E / $ >$ / * - b / E � / � § -1KWEZ / $ 2t I won- 4, : _ QJ2 , A = I : m .J L : 0 0 2 ± < c co co co >-0 3 3 3 3 m n Q e e eli 0 ID / (N / / co � � (N \ CD o CD $ < TREE= 6318'CNV FLS • F—2 7 B silk NOTES:WELL ANGLE>700•10524' Y ELL.FEAD= McEVOY ACTUATOR= BAKER C OKB.aEV= 67.9' BF.ELEV= 38.41' ( 2087• -f4-1/2'OTIS SSSV NP,0=3.813' KOP=_ 10414' M3 Angle= 95"@ 11256' GAS LFT MANDRELS Datum MD= 10265' ST MD TVD DEV TY FE VLV LATCH PORT DATE Datum N= 8800'SS 7 2985 2984 6 OTIS DOME R#4 r 16 02/16/11 6 5058 4796 39 OTIS SO RM r 20 02/16/11 13-3/8"CSG,68#,L-80,D=12.415" —{ 2694' 5 6575 5956 41 OTIS DMY RA r 0 0923110 4 7511 6680 38 OTIS DMY RA r 0 09/23/10 3 8094 7136 39 OTIS DMY RA r 0 09/23/10 2 8714 7625 37 OTIS DMY RA 0 09/23/10 Minimum ID =2.25" @ 10394' 1 9215 8035 34 OTIS DMY RA 0 0923110 2.70" DEPLOYMENT SLEEVE I 9361' 4-1/1— --) XA SLDNG SLEEVE 9419' HTIWSBRIBG SEAL ASSY 9434' H9-5/8"X 4-1/2"TW IABP PKR,D=4.75" I 9475' —14-1/2'ORS X NP,D=3.813' TOP OF 7"1.142 H 9490' . 9491• _H 3-12"BOT D&L.OY SLEEVE,D=3.00" I r 9508' H4-1/2'OTIS XN NP,MLLED(08/21/05) D=3-80"(BDND PIPE) 9510' H3-1/2"HOWCOX NP,D=2.813" 4-12'TBG,12.6#,L-80,.0152 bpf,0=3.958' H 9539. 3.1/2"LNR,8.81#,L-80 STL,.0087 bpf,D=2.990' H 9643' _ • 963W —{4-12"BAKER SOS TBG TAL BEHIND 9644' 16-MD TT LOGGED 11/06/86 CT LNR 9-518"CSG,47#,L-80,D=8.681' --19734• 8543" J--)3-12-X 3-3/16'XO,D=2.867 ESTIMATED TOP OF CEMENT I---1 10300' • 1019r H MARKER JONT 7'x 4-1/7 RECHANCAL WS(08/19/05) H 10414' t •-•- 10338' 112.275"WFD EXT RANGE CBP(06/25/16) 7'LNR,26#,L-80,U4S,.0383 bpf,D=6.276" —10426 ►i� i♦i ►♦♦: •♦♦ ��:i �Q MILLOUT WINDOW (F-27A)10419'-10426' ►♦♦1 TOP OF 2-3/8"LNR —I 10394' I 10394' H2.70"DEPLOY SLEEVE,D=2.25' I I 3-3/16"WFFSTOCK(1223/10) --I 10571' I : MILLOUT WINDOW (F-27B)10571'-10576' 3-3/16"LNR,6.21,L-80 TCII,.0076 bpf,I)=2.80' 10600' Is,- ` .` - - FERFORATION SUMNARY ' REF LOG:IUM)GR LOG 08/30/05 ANGLE AT TOP FERE:NA "•-• Note:Refer to Production DB for historical pert data - •N. SIZE SPF NIERVAL Opn/Sqz DATE ' `. 2-12" 6 9764-9804 0 06/24/16 N.. ` 2-3l8" SLID 10401-12227 C 12!30110 2-3/8"SLID LNR,4.41,L-80 STL..0039 bpf,D=1.992" H 1222T DATE FEV BY COMMENTS DATE REV BY COMMENTS NITS PRUDHOE BAY UNIT 10/31/86 N22E ORIGINAL COMPLETION 04/20/15 DU/AU TREE C/O(04/12/15) WELL: F-27B 09/02/05 NORDIC 1 CTD 06/27/16 BT1*JMD ADFERFS&SET CFP PEW Pb: 210610 12/31/10 NORDIC 1 CTD SIDETRACK(F-27B) AR Pb: 50-029-21659-02 01/12/11 PJC DRLG DRAFT coRREcnones SEC 2,T11 N,R13E,2249'FSL&2195'FEL 01/13/11 AK/PJC FINAL DRLG CORRECTIONS 03/02/11 MCMYPJC GLV C/O(02/16/11) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p2 LO - 1 Well History File Identifier Organizing(done) ❑ Two-sided III 11111 I III II III ❑ Rescan Needed II IIIIIIIIII 111111 R CAN DIGITAL DATA OVERSIZED (Scannable) C for Items: Li D' kettes, No. ❑ Ma s: IIAA �,,, r 1 reyscale Items: Other, No/Type: C, Mvv' 1 Other Items Scannable by a Large Scanner Logs ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: . BY: Maria Date: 1 9 / /s/ 14 Project Proofing I IIIIIIIIII I IIIII BY: Maria Date: 4.17114 /s/ Scanning Preparation I x 30 = 3 0 + a I = TOTAL PAGES El (Count does not include cover sheet) BY: Maria Date: Li—hpL /s/ Production Scanning II 1111111111 IIIII Stage 1 Page Count from Scanned File: 5 a (Count does include cover set) Page Count Matches Number in Scanning Preparation: YES NO BY: An, Date: �. 1 I /4 lsl vyi, p Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 111111111111111111 ReScanned 11111111111111111 BY: Maria Date: /s/ Comments about this file: Quality Checked INIIIIIIIIIIIIIII I o N f0 a C 2 to y O U O) N d L Ort Z 0 a a. N = O = a) y o Q 0 c }I m E U a L (A CC li T coE cn*a CC O a) o a) g o J 0 O Y. co c >V O U 2 I- 2 , { Q N O a/ a) 0 0d. a) O O O O O O O J N y U N N N N N N N I O O Q O m ix (0 CO N N O O U) �,, '. N N N N N N N Z J e- M M M Cl M C Q E -- c c c c c c c a) 2 E °' �/ y f0 O U O O O O O O O E 0 LL co J CO U c Q N ca CV O Z it) O N N N N N N N d a) 0 N .- CV 1- N CV °'t' a 0. PZ R a }\ >5 W g a) to to u, V, CV N ca Z IX _1 c CO (moo cO O tOo a u,O O O O 0.. v UJ x U a. m o o y Z '- e o 0 o a. Z o' H Q o y y o o. ea 1 _ O v 0 >. E Z) U U U ic4 J 2 N Q aZ N oy y a11 O N U E co J U) N 10 10 CO CO `Q m Z N IC y M a) CO CO CV .- c o m 0 I-' a• .- a oI ce i Q o E Z 0 T >, Q Z a) oa) a) 4 U o Z Z c E J Z 0 I g m m m m m m o o 'c 0 m m m E E E E • I I • NI- '1 = z .- .- ca m m m m �_ I o) a' 0 O J 0 0 0 0 ' y m z O7 O ZO -; w y d m ,o Z m U E CO 5 Q I>-� -a c Q Z w a w G Z `" y > 3 l N O O r d p m O H . R l a y U. c.. .` Z U O a� LL y y a3 J N • N O V C O 82 d Q J co W z Z D 8 0.. i CO) C IX LL 0 z W c 1 ° O U y > as E a Q. o , _io , w rt w - - - li Q CD U ¢� U v BAKER Nu611.11ds Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME F-27B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 3/21/2011 THIS DISTRIBUTION LIST AUTHORIZED BY: LAUREN VERONIE SO#:3556257 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By:BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: :700,f7N IC Page 1 of 1 INTEQ Log & Data Transmittal Form To: State of Alaska -AOGCC 333 W. 7th Ave. Suite 100 Anchorage,Alaska 99501 Attention: Christine Mahnken Reference: 02-36A Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary 1 color print—GR Directional Measured Depth Log (to follow) 1 color print—MPR/Directional TVD Log (to follow) 1 color print—MPR/Directional Measured Depth Log(to follow) LAC Job#: 3281463 Sent by: Lauren Veronie Date: 3/ ' Received by: Date: , � 3'' -21 Sas,=1s. Cv-nrnis4b1 PLEASE ACKNOWLEDGE RECEIPT : ' GNI] 40RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ Nal 7260 Homer Drive BAKER Anchorage,Alaska 99518 HUGHES Direct: (907)267-6612 INTEQ FAX: (907)267-6623 Saltmarsh, Arthur C (DOA) From: Hubble, Terrie L [Terrie.Hubble@bp.com] Sent: Monday, February 28, 2011 10:43 AM To: Saltmarsh, Arthur C (DOA) Subject: PBU F-27B/PTD#210-161 Hi Art, Please reference the following well: Well Name: PBU F-27B Permit#: 210-161 API #: 50-029-21659-02-00 Top Perf MD: 10401' Bottom Perf MD: 12227' This well began Production on February 27, 2011 Method of Operations is: Flowing Date of Test: 02/27/11 Hours Tested: 4 24-Hour Rate/Oil-Bbl: 2,230 24-Hour Rate/Gas-Mcf: 5,950 24-Hour Rate/Water-Bbl: 186 Test Rate/Oil-Bbl: 372 Test Rate/Gas-Mcf: 992 Test Rate/Water-Bbl: 31 Choke Size: 176 Gas-Oil Ration: 2,668 Flow Tubing Pressure: 348 Casing Pressure: 920 Oil Gravity-API: Not Available 1 ^ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 12/31/2010 210-161 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 12/25/2010 50-029-21659-02-00 4a. Location of Well(Govemmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 12/29/2010 PBU F-27B 2249'FSL,2195'FEL,SEC.02,T11 N, R13E, UM 8. KB(ft above MSL): 67.90 15.Field/Pool(s): Top of Productive Horizon: 4812'FSL, 1367'FWL, SEC.01,T11 N, R13E, UM GL(ft above MSL): 36.46' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+1VD): Oil Pool 4633'FSL,324'FWL, SEC.01,T11N, R13E, UM 12227' 9046' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 652650 y- 5973783 Zone- ASP4 12227' 9046' ADL 028280 TPI: x- 656157 y- 5976419 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 655118 y- 5976218 Zone- ASP4 N/A 18.Directional Survey: ®Yes ❑No ' 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD,GR, ROP, Gyro 10571' 9053' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu vd Concrete 13-3/8" 72# L-80 Surface 2696' Surface 2696' 17-1/2" 3351 cu ft Arcticset III 465 cu ft AS ll 9-5/8" 47# L-80 Surface 9736' Surface 8456' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 9491' 10419' 8258' 8985' 8-1/2" 327 cu ft Class'G' 3-1/2'x3-3/18'x2-7/8 e.e1ae.210/e.18r L-80 9491' 10571' 8258' 9053' 4-1/8" 185 cu ft Class'G' 2-3/8" 4.7# L-80 10394' 12227' 8966' 9946' 3" Uncemented.slotted liner 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 2-3/8" Slotted Liner 41/2', 12.6#,L-80 9539' 9434' MD ND MD TVD 10401'-12227' 8971'-9046' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. _ , :::;; DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED `. `47' 2500' Freeze Protect with 50 Bbls 60/40 Methonal / ...it !1 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory aanna c6 per 20 MC 250.071. iA) None JA 3 1 OP RBDMS JAN 3 1 2011��c r~ ill fission Form 10-407 Revised 12/2009 CONTINUED ON REVERSE �. i 9 r iI0 -�rlZf . Submit Original Only 29. GEOLOGIC MARKERS(List all formations and n, :rs encountered): 30. .ORMATION TESTS NAME MD TVD Well Tested? 0 Yes 0 No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Zone 1A 11075' 9045' None Formation at Total Depth(Name): Ivishak Zone 1A 12227' 9046' 31.List of Attachments: Summary of Daily Drilling Reports,Well Work Summary,Well Schematic Diagram and Surveys. 32.I hereby certify that the fore oing is true and correct to the best of my knowledge. Signed: Sond Stewma MCC /_, Title: Drilling Technologist Date:(t ' ocC)- I PBU F-27B 210-161 Prepared By Name/Number Sondra Stewman,564-4750 Well Number Permit No./Approval No. Drilling Engineer: Amanda Rebol,564-5543 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only It F- TREE= 6"Mc EVOY 2 7 B SAFE! /TES:WELL ANGLE>70°@ 10524' WELLHEAD= McEVOY ACTUATOR= OTIS KB. ELEV= 67.9' PJC DRAFT BF. ELEV = 38.41' 2087' —I4-1/2"OTIS SSSV NIP,ID=3.813" KOP= 10414' I a Max Angle=94.5 @ 11256' GAS LIFT MANDRELS Datum MD= 10265' ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum TV = 8800'SS 7 2985 2984 6 OTIS DMY RM ► 0 09/23/10 ,',,; (C1(/' ` I I 6 5058 4796 39 OTIS DMY RM r 0 09/23/10 13-3/8"CSG,68#, L-80, ID=12.415" -{ 2694' y 5 6575 5956 41 OTIS DMY RA r 0 09/23/10 4 7511 6680 38 OTIS DMY RA r 0 09/23/10 3 8094 7136 39 OTIS DMY RA r 0 09/23/10 2 8714 7625 37 OTIS DMY RA 0 09/23/10 Minimum ID = 2.25" @ 10394' 1 9215 8035 34 OTIS DMY RA 0 09/23/10 2.70" DEPLOYMENT SLEEVE 1 1 9361' H4-1/2"OTIS XA SLIDING SLEEVE 1 9419' -TM/SBR TBG SEAL ASSY g 9434' —19-5/8"X 4-1/2"TIW HBBP PKR, ID=4.75" i 9475' —14-1/2"OTIS X NIP, ID=3.813" TOP OF 7"LNR — 9490' -- 9491' —13-1/2"BOT DEPLOY SLEEVE, ID=3.00" i 1.- 9508' 4-1/2"OTIS XN NIP,MILLED(08/21/05) ID=3.80"(BEHIND PIPE) I 9510' —13-1/2"HOWCO X NIP, ID=2.813" 4-1/2"TBG, 12.6#, L-80, .0152 bpf, ID=3.958" 9539' 3-1/2"LNR,8.81#, L-80 STL, .0087 bpf, ID=2.990" —I 9543' / \----1 9539' —4-1/2"BAKER SOS TBG TAIL BEHIND t. itf, 9544' —I ELMD TT LOGGED 11/06/86 CT LNR 9-5/8"CSG,47#,L-80,ID=8.681" — 9744' • ' 9543' —13-1/2"X 3-3/16"XO, ID=2.867" ESTIMATED TOP OF CEMENT H 10300' 0 10192' 1 MA RKER JOINT 7"x 4-1/2"MECHANICAL WS(08/19/05) --I 10414' r•'4 7"LNR,26#,L-80, IJ4S, .0383 bpf, ID=6.276" -1 -10426 i••••: •••• � '�.' •• MILLOUT WINDOW (F-27A) 10419'-10426' TOP OF 2-3/8"LNR —I 10394' I R 10394' H2.70"DEPLOY SLEEVE, ID=2.25" AcLr w..5: 1 1 3-3/16"WHIPSTOCK(12/23/10) --I 10571' I t \ MILLOUT WINDOW (F-27B) 10571'-10576' 3-3/16"LNR,6.2#, L-80 TOIL .0076 bpf, ID=2.80" — 10600' '•. \ .\ PERFORATION SUMMARY REF LOG:MWD GR LOG 08/30/05 — w ANGLE AT TOP PERF:41°@ 10401' Note: Refer to Production DB for historical perf data ` SIZE SPF INTERVAL Opn/Sqz DATE -, 2-3/8" SLTD 10401 - 12227 SLOT 12/30/10 2-3/8"SLTD LNR,4.4#,L-80 STL. .0039 bpf, ID=1.992" 12227' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/31/86 N22E ORIGINAL COMPLETION WELL: F-27B 09/02/05 NORDIC 1 CTD PERMIT No: 210610 12/31/10 NORDIC 1 CTD SIDETRACK(F-27B) API No: 50-029-21659-02 01/12/11 PJC DRLG DRAFT CORRECTIONS SEC 2,T11 N,R13E,2249'FSL&2195'FEL 01/13/11 AK/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) North America -ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name: F-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00 00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI:500292165900 Active Datum:28: 27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/21/2010 06:00 - 09:30 3.50 MOB P PRE RIG RELEASED FROM E-05B AT 06:00. PREP TO MOVE RIG OFF WELL. 09:30 - 10:00 0.50 MOB P PRE PJSM TO MOVE RIG OFF WELL. 10:00 - 15:00 5.00 MOB P PRE MOVE RIG FROM E-PAD TO F-PAD. 15:00 - 16:30 1.50 MOB P PRE PREP F-27 TO MOVE RIG OVER WELL. 16:30 - 18:00 1.50 MOB P PRE MOVE RIG OVER WELL. 18:00 - 23:30 5.50 BOPSUR P PRE RIG ACCEPT 18:00. AOGCC WITNESS WAIVED BY JEFF JONES. PJSM,NU BOP'S AND FUNCTION TEST. 23:30 - 00:00 0.50 BOPSUR P PRE BOP TEST. 12/22/2010 00:00 - 09:30 9.50 BOPSUR P PRE TEST BOPE. PASS. AOGCC WITNESS 30/ WAIVED BY JEFF JONES. 09:30 - 11:45 2.25 BOPSUR P PRE TEST TREE VALVES(INCLUDING SSV). TEST AGAINST TWC TO CONFRIM PRESSURE INTEGRITY OF LOWER FLANGE FACE OF MV. CHART TESTS. ALL PASS. 11:45 - 13:30 1.75 BOPSUR P PRE PRE-SPUD MEETING W/CREW. REVIEW HIGH GOR SOP. 13:30 - 15:00 1.50 BOPSUR P PRE PRESSURE TEST PUMP#1 OUTLET MANIFOLD 15:00 - 16:30 1.50 BOPSUR P PRE DISPLACE DIESEL FROM CT. TEST INNER REEL VLAVE AND PACKOFF AND CHART TESTS AS PART OF BOPE TEST. 16:30 - 18:50 2.33'. RIGU P WEXIT PUMP SLACK BACK INTO CT. CUT COIL(CUT 300'CT). 18:50 - 21:30 2.67 RIGU P WEXIT INSTALL CTC LEAKS,INSTALL ANOTHER ONE. PULL TEST TO 30K AND PT 3500 PSI. INSTALL UQC. 21:30 - 22:00 0.50 RIGU P WEXIT MEG E-LINE IN COIL. CHANGE TOP AND BOTTOM HIGH PRESSURE FILTERS IN REEL HOUSE. 22:00 - 22:45 0.75 RIGU P WEXIT UQC DUAL FLAPPER CHECK VALVES PRESSURE TESTED AND CHARTED. PT BOTTOM HIGH PRESSURE FILTER IN REEL HOUSE. 22:45 - 23:30 0.75 RIGU P WEXIT STAB ON WELL AND PUMP SLACK FORWARD @ 1.5 BPM FOR 36 BBLS. 23:30 - 00:00 0.50 RIGU P WEXIT BRING BAKER WS TOOLS TO FLOOR TO WARM UP. MARKED OFF RADIO ACTIVE AREA AROUND WS. 12/23/2010 00:00 - 00:30 0.50 STWHIP P WEXIT PJSM TO TEST LUBRICATOR. 00:30 - 04:30 4.00 STWHIP N SFAL WEXIT TEST LUBRICATOR 250 LOW/3500 HIGH AND CHARTED. SSV WILL NOT OPEN. HOOKED UP HEATER TO VALVE. FILLED TREE WITH METHONAL. Printed 1/28/2011 1:52:01PM • North America ALASKA- BP Page 2 of 7 Operation Summary Report Common Well Name:F-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 STWHIP N SFAL WEXIT VALVE CREW ON LOCATION TO TROUBLESHOOT SSV. SHIFT CHANGE. VALVE CREW DETERMINES THAT THE SSV BONNET IS LIKELY MISALIGNED, NOT ALLOWING IT TO MAKE PROPER CONTACT W/THE STEM(ATTACHED TO THE GATE)TO OPEN THE VALVE. VALVE CREW PROPERLY ALIGNS THE BONNET. SSV FUNCTIONS FREELY. 06:00 - 07:30 1.50 STWHIP P WEXIT EQUALIZE AND PULL TWC. SIWHP=0 PSI. RECOVER TWC. LD VALVE CREW LUBRICATOR. 07:30 - 09:15 1.75 STWHIP P WEXIT FREEZE PROTECT EXPOSED CT IN PREPARATION FOR DOUBLE PUMP KILL. PT UPPER HIGH PRESSURE FILTER. 09:15 - 09:45 0.50 STWHIP P WEXIT PJSM PRIOR TO KILL OPERATIONS. CONFIRM THAT HAND MANUALLY CONFIRMED THAT IA AND OA GAUGES AND TRANSDUCERS ARE OPEN TO THEIR RESPECTIVE ANNULI. FORMULATE PLAN AND STAGE EQUIPMENT FOR CONTINGENCY ANNULAR BLEED OPERATIONS. ASSIGN HAND TO CONFIRM ANNULAR PRESSURES W/READINGS FROM HARD GAUGES IN CELLAR DURING KILL. 09:45 - 12:00 2.25 STWHIP P WEXIT WHP=0 PSI. IAP=0 PSI(CONFIRMED W/ MANUAL GAUGE IN CELLAR). OAP=0 PSI (CONFIRMED W/MANUAL GAUGE IN CELLAR). • PUMP 5 BBLS NEAT METH SPEAR DOWN WELLBORE,BULLHEADING W/NO RETURNS. SWAP TO KCL. ONLINE W/2%KCL BULLHEADING DOWN TUBING W/NO RETURNS. INITIAL RATE IS —4.75 BPM AT 0 PSI WHP. AFTER—35 BBLS AWAY,BEGIN TO GET POSITIVE WHP(4.75 BPM AT 150 PSI). 50 BBLS AWAY:4.9 BPM AT 205 PSI. IAP= OAP=0 PSI. 70 BBLS AWAY:4.9 BPM AT 245 PSI. 90 BBLS AWAY:4.9 BPM AT 295 PSI. IAP= OAP=0 PSI. 110 BBLS AWAY:4.9 BPM AT 295 PSI. 140 BBLS AWAY: 4.8 BPM AT 240 PSI. IAP= OAP=0 PSI. 160 BBLS AWAY: 4.9 BPM AT 340 PSI. IAP= OAP=0 PSI. 175 BBLS AWAY: 5 BPM AT 420 PSI. 190 BBLS AWAY: 5 BPM AT 490 PSI. IAP= OAP=0 PSI. 215 BBLS AWAY: 5 BPM AT 500 PSI. 240 BBLS AWAY:5 BPM AT 510 PSI. 250 BBLS AWAY: FINAL RATE 5 BPM AT 510 PSI. DOWN ON PUMP. PRESSURE IMMEDIATELY FALLS,WELL GOES ON VAC. STATIC LOSS RATE IS STABLE AT—2.3 BPM. 12:00 - 14:00 2.00 STWHIP P WEXIT CALL TOWN REGARDING HIGH STATIC LOSS RATE. AGREE TO SWAP WELL TO MUD. MUD HAS ALREADY BEEN LOADED-CALL FOR MUD TO BE DELIVERED FROM DEADHORSE YARD. KEEP HOLE FULL UNTIL MUD ARRIVES. Printed 1/28/2011 1:52:01PM • North America -ALASKA- BP Page 3 of 7 Operation Summary Report Common Well Name: F-27 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 12/8/2010 End Date: IX3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:00 - 15:10 1.17 STWHIP P WEXIT MUD ON LOCATION(520 BBLS TOTAL,405 BBLS OF WHICH IS USED). ONLINE W/MUD DOWN TUBING W/NO RETURNS TO BULLHEAD DISPLACE WELL TO MUD. SPEAR IN W/20 BBLS HIGH VIS MUD(-100K LSRV)FOLLOWED BY REGULAR MUD. 35 BELS AWAY: 4 BPM AT 450 PSI. -50 BBLS AWAY:4 BPM AT 575 PSI. 115 BBLS AWAY:4 BPM AT 830 PSI. IAP:0 PSI. OAP:50 PSI. 135 BBLS AWAY:4 BPM AT 1350 PSI. 160 BBLS AWAY:4 BPM AT-1500 PSI FINAL PRESSURE. DOWN ON PUMP. SURFACE PRESSURE SLOWLY DISSIPATES(DOES NOT IMMEDIATELY FALL TO ZERO). 15:10 - 16:30 1.33 STWHIP P WEXIT FLOWCHECK FOR 30 MINUTES-PASS. FILL-UP WELL W/-3.5 BBLS AFTER FLOW CHECK. 16:30 - 17:00 0.50 STWHIP P WEXIT PJSM TO MU WS BHA. 17:00 - 17:30 0.50 STWHIP P WEXIT MU WS BHA. 17:30 - 17:50 0.33 STWHIP P WEXIT STAB INJECTOR ONTO WELL. 17:50 - 20:45 2.92 STWHIP P WEXIT RIH.PVT 271 BBLS,IA 0 PSI,OA 75 PSI,EDC OPEN PUMPING.3BPM 20:45 - 21:30 0.75 STWHIP P WEXIT GR TIE IN 9730'TO 9806'CORRECTION-8'. 21:30 - 23:00 1.50 STWHIP P WEXIT RIH TO 10,580'UP WT 32K,DOWN WT 19K. LOG CCL 10,580'TO 10,430'. PU TO NEUTRAL WT 26K,CLOSE EDC. 23:00 - 00:00 1.00 STWHIP P WEXIT SET WS TOP AT 10,571'. PRESSURE UP TO 3600 PSI TO SHEAR. SET DOWN 5K. 12/24/2010 00:00 - 00:40 0.67 STWHIP P WEXIT LOG CCL ACCROSS JEWERLY UP TO 9400'. 00:40 - 02:30 1.83 STWHIP P WEXIT POH WITH WS SETTING BHA. 02:30 - 02:45 0.25 STWHIP P WEXIT PJSM TO LD WS SETTING BHA. 02:45 - 03:00 0.25 STWHIP P WEXIT LD WS SETTING BHA. 03:00 - 04:15 1.25 STWHIP P WEXIT TEST PACKER 250 LOW/2400 PSI HIGH FOR 30 MIN.CHARTED. 04:15 - 04:30 0.25 STWHIP P WEXIT PJSM TO MU MILLING BHA. 04:30 - 06:15 1.75 STWHIP P WEXIT MU WINDOW MILLING BHA.MILL AND STRING MILL 2.74 GO 2.73 NOGO. BEGIN RIH W/ SAME CIRCULATING W/FULL RETURNS. 06:15 - 09:00 2.75 STWHIP P WEXIT SHIFT CHANGE. RIH W/MILLING ASSEMBLY CIRCULATING W/FULL RETURNS. LOG TIE-IN,CORRECTION OF(-6'). DRY TAG TOWS AT 10571.5'MD, RIH WEIGHT 20K LB. STACK 2K LB ON WS. 09:00 - 11:30 2.50 STWHIP P WEXIT BEGIN MILL WINDOW.FS 3350 PSI AT 1.5 BPM. ENGAGE AND SEE MOTOR WORK AT TOWS AT 10571.1'MD,MILLING WINDOW AT 3400 PSI W/600 LB DHWOB. 10:00-MILLING WINDOW AT 10572.0'MD AT 1.5 BPM AT 3385 PSI. BHP/ECD/PVT:4461 PSI /9.59 PPG/297 BBL. DELTA P ON MOTOR IS 710 PSI, 1500 LB DHWOB. MILLING W/FULL rrp RETURNS. Printed 1/28/2011 1:52:01 PM North America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name:F-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 13:30 2.00 STWHIP P WEXIT MILLING WINDOW AT 10573.3'MD AT 1.46 BPM AT 3250 PSI W/900 LB DHWOB AND FULL RETURNS. BHP/ECD/PVT 4464 PSI/9.59 PPG/296 BBLS. DELTA P ON MOTOR IS 550 PSI. IAP:500 PSI,OAP 400 PSI. 13:30-MILLING WINDOW AT 10574.9'MD AT 1.44 BPM AT 3140 PSI W/800 LB DHWOB AND -FULL RETURNS. BHP/ECD/PVT 4464 PSI/9.59 PPG/294 BBL. DELTA P ON MOTOR IS 610 PSI. IAP:610 PSI,OAP:540 PSI. 13:30 15:45 2.25 STWHIP P WEXIT MILLING AHEAD. 14:00-BELIEVE WE EXIT WINDOW AT 10575.5'MD. MILLING AHEAD AT 1.45 BPM AT 3100 PSI W/300 LB DHWOB AND FULL RETURNS. CONTINUE TIME MILLING TO ENSURE CLEAN LIP. NOTE:NO STALLS ON THIS WINDOW. BLEED OAP FROM 550 PSI TO-50 PSI IN 5 MINUTES. BLEED IAP FROM-650 PSI TO-60 PSI IN-10 MINUTES. MILL OPEN HOLE. 15:45-MILLING OH AT 10586'MD AT 3100 PSI AT-1.45 BPM W/300 LB DHWOB. PUH TO PERFORM RECIPROCATIONS. 15:45 - 17:00 1.25 STWHIP P WEXIT PERFROM THREE RECIPROCATIONS ACROSS WINDOW AT BETWEEN 1 AND 2 FPM. WINDOW CLEAN FROM FIRST PASS. DRY DRIFT WINDOW,CLEAN. BTT PICKS: TOW 10571.1'. BOW 10575.5. RA TAG ESTIMATED TO BE AT 10576.3'MD. SAMPLES COME BACK TO SURFACE,"GOOD" INDICATION OF FORMATION FROM GEO. BEGIN POOH CIRCULATING AT-1.5 BPM W/ FULL RETURNS. 17:00 - 19:20 2.33 STWHIP P WEXIT POOH 19:20 - 19:30 0.17 STWHIP P WEXIT PJSM TO LD MILLING BHA AND MU DRILLING BHA. 19:30 - 19:40 0.17 STWHIP P WEXIT TAG UP AND BREAK OFF INJECTOR. 19:40 - 20:15 0.58 STWHIP P WEXIT LD WINDOW MILLING BHA.WINDOW MILL AND STRING REAMER NOGO ON 2.73". CHECKED TREE BOLT.ALL GOOD. FLOW CHECKED WELL FOR 30 MIN.NO FLOW OR LOSSES. 20:15 - 20:30 0.25 STWHIP P WEXIT KICK DRILL. DEPLOY SAFETY JOINT. 20:30 - 21:00 0.50 STWHIP P PROD1 MU DRILLING BUILD BHA. PU INJECTOR AND STAB ON WELL. 21:00 - 00:00 3.00 STWHIP P PROD1 RIH. PVT=256 BBLS 12/25/2010 00:00 - 00:30 0.50 DRILL P PROD1 FINISH RIH TO TIE IN DEPTH. 00:30 - 01:00 0.50 DRILL P PROD1 LOG GR TIE IN FROM 10435'TO 10456'. -5.5 CORRECTION. 01:00 - 03:30 2.50 DRILL P PROD1 HARD DRILLING ON BOTTOM.NO STALLS. STRINGERS GIVING US 50 DEGREE DOG LEGS. FS 3000 AT 1.4 BPM.PVT 295BBLS. WOB 1.5K 03:30 - 06:15 2.75 DRILL N RREP 10,710.00 PROD1 PUMP 1 OILER PUMP QUIT. WITHIN 10'OF WIPER DEPTH-WIPER FROM HERE INTO TUBING. ELECTRICIAN HERE TO FIX IT. Printed 1/28/2011 1:52:01PM North America -ALASKA- BP Page 5 of 7 Operation Summary Report Common Well Name: F-27 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:15 - 07:30 1.25 DRILL N RREP 10,710.00 PROD1 WSL C/O. STANDBY TO FIX OILER PUMP, RECIPROCATE W/OPEN EDC ABOVE LINER. S �L USE SB TIME TO ALLOW CREW TO CALL V�r-i HOME FOR HOLIDAYS. PUMP REPAIRED AND ! _ _ TESTED. RBIH TO DRILL AHEAD. _ 07 30 - 09:20 1.83 DRILL P PROD1 DRILL AHEAD FROM 10710'MD. FREESPIN 3080 PSI AT 1.5 BPM. 08:30-DRILLING AHEAD AT 10750'MD AT 1.5 BPM AT 3200 PSI W/FULL RETURNS AND 640 LB DHWOB(16700 LB SURFACE WEIGHT)AT 50 FPH. BHP/ECD/PVT:4522 PSI/9.68 PPG/ 297 BBLS. IAP=335 PSI. OAP=400 PSI. TRYING TO BE CONSERVATIVE W/WOB TO MINIMIZE OUR DLS(GETTING MORE BUILD THAN WE ANTICIPATED). 09:20-DRILLING AHEAD AT 10790'MD AT 1.5 BPM AT 3230 PSI W/FULL RETURNS AND 1500 LB DHWOB(15800'SURFACE WEIGHT) AT 46 FPH. BHP/ECD/PVT:4523 PSI/9.69 PPG/297 BBLS. IAP:365 PSI. OAP:430 PSI. 09:20 - 11:30 2.17 DRILL P PROD1 DD CALLS END OF BUILD AT 10790'MD. POOH FOR LATERAL BHA CIRCULATING W/ FULL RETURNS. 11:30 - 11:50 0.33 DRILL P PROD1 .FLOW CHECK. PJSM. 11:50 - 12:45 0.9,2 DRILL P PROD1 POP OFF. LD BUILD BHA. GRADE BIT 1-3-CT-G-X-1-BT-BHA. CHANGE MOTOR BEND. 12:45 - 13:15 0.50 DRILL P PROD1 MU LATERAL BHA W/REBUILT HYCALOG RAZOR BIT. STAB ON. 13:15 - 15:45 2.50 DRILL P PROD1 RIH W/LATERAL BHA. 14:00-RIH AT 3600'CIRCULATING AT 0.4 BPM AT 1280 PSI W/FULL RETURNS. IAP: 110 PSI. OAP:320 PSI. TIE-IN,CORRECTION OF(-6). 15:45 - 17:25 1.67 DRILL P PROD1 DRILL AHEAD FROM 10790'MD AT 1.5 BPM AT 3290 PSI(3200 PSI FREESPIN)W/800 LB DHWOB AND 18000 LB SURFACE WEIGHT W/ FULL RETURNS AT 120 FPH. BHP/ECD/PVT: 4510 PSI/9.66 PPG/295 BBL. IAP: 160 PSI. OAP:310 PSI. 16:30-DRILLING AHEAD AT 10866'MD AT 1.5 BPM AT 3335 PSI W/650 LB DHWOB AND 16700 LB SURFACE WEIGHT W/FULL RETURNS AT 105 FPH. BHP/ECD/PVT:4537 PSI/9.72 PPG/294 BBLS. IAP:270 PSI. OAP: 340 PSI. DRILL TO 10,950'MD. 17:25 - 17:45 0.33 DRILL P PROD1 WIPER TRIP FROM 10,950'TO WINDOW. CLEAN WIPER TRIP 17:45 - 19:30 1.75 DRILL P PROD1 DRILLING FROM 11,050'1.5 BPM,3480 PSI TO 11,101',85-93 FPH.FS 3100PSI PVT 287 BBLS,IA 376 PSI,OA 421 PSI 19:30 - 20:30 1.00 DRILL P PROD1 WIPER TRIP FROM 11,101'TO WINDOW, TIGHT AT 11,040'WHILE RIH.WITH 1 STALL ON MOTOR. PVT 282 BBLS 20:30 - 22:00 1.50 DRILL P PROD1 DRILLING FROM 11,101',1.53 BPM,3600 PSI, 100 FPM. PVT 282 BBLS.FS 3100 PSI DRILLING TO 11,250" Printed 1/28/2011 1:52:01PM North America -ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name: F-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 22:46 0.77 DRILL P PROD1 WIPER TRIP FROM 11,250'TO WINDOW, CLEAN WIPER TRIP TO WINDOW 22:46 - 23:20 0.57 DRILL P PROD1 TIE IN AT 10,590',+3.5'CORRECTION. TIGHT AT 10,989'AND 11,100'RIH. 23:20 - 00:00 0.67 DRILL P PROD1 DRILLING FROM 11,250',1.5 BPM,3600PSI, FS 3100 PSI, PVT 273 BBLS.IA 540 PSI,OA 585 PSI. DRILLING TO 11,282',85 TO 90 FPH. 12/26/2010 00:00 - 01:20 1.33 DRILL P PROD1 DRILLING LATERAL SECTION FROM 11,282' TO 11400'1.55 BPM,8.6PPG.3300 PSI,ECD 10.01, 125 FPM PVT 269 BBLS.IA 594 PSI,OA 635 PSI 01:20 - 02:30 1.17 DRILL P PROD1 WIPER TRIP FROM 11,400'TO WINDOW, CLEAN WIPER. PVT 269 BBLS. 02:30 - 04:00 1.50 DRILL P PROD1 DRILLING FROM 11,400'1.55 BPM,3300 PSI, 129 FPH,16,329 CTB WT.OA 641 PSI,IA 614 PSI. 04:00 - 06:15 2.25 DRILL P PROD1 BLED IA FROM 614 TO 35 PSI IN 3 MINUTES, ,ALL DIESEL. BLED OA FROM 641 TO 31 PSI IN 3 MINUTES, ALL DIESEL. DRILLING AT-11650'MD. ROP DROPS FROM -90 FPH TO NEARLY ZERO. CIRC PRESSURE ERRATIC,MOTOR BEGINS TO STALL FREQUENTLY. RECOVER-DOZEN PIECES OF RUBBER(APPEAR TO BE FROM STATOR) W/BOTTOMS UP. BEGIN POOH FROM 11657'MD FOR MOTOR. 06:15 - 09:45 3.50 DRILL P PROD1 POOH FOR MOTOR,CIRCULATING W/FULL RETURNS. 09:45 - 11:00 1.25 DRILL P PROD1 PJSM FOR BHA SWAP. FLOW CHECK. UNSTAB, LD TOOLS. FEEL MOTOR LOBES, OK. TURN W/AIR,A LITTLE LOOSE,BUT NOTHING OBVIOUSLY BAD. BIT LOOKS GOOD,1-1. RUN SAME BHA W/NEW MOTOR(ZERO HOURS)W/1.1 AKO AND SAME REBUILT HYC RAZOR BIT. STAB ON. BEGIN RIH. 11:00 - 13:30 2.50 DRILL P PROD1 RIH CIRCULATING AT 0.3 BPM W/FULL RETURNS. IAP:0 PSI. OAP 60 PSI. REVIEW PROCEDURE FOR MUD SWAP. FORMULATE PLAN FOR MUD SWAP TO ADHERE TO NEW FLUID MANAGEMENT POLICIES. 13:30 - 13:40 0.17 DRILL P PROD1 TIE-IN,CORRECTION OF(-6.5'). 13:40 - 14:45 1.08 DRILL P PROD1 RIH TO BOTTOM. SET DOWN ON SHALE AT 11255'MD-11260'MD AND WORK SEVERAL TIMES TO GET THROUGH. CONTINUE TO BOBBLE THROUGH ERRATICALLY TO 11325' MD. AGAIN WORK THROUGH SHALE AT 11480'MD. MORE RATTY SPOTS AT-11530' MD-11580'MD. 14:45 - 17:20 2.58 DRILL P PROD1 RECIPROCATE NEAR BOTTOM. MUD SWAP TO NEW BAROID QUIKDRILL MUD(OLD SYSTEM 21 DAYS OLD,-1450 FT,MBT DOUBLED SINCE YESTERDAY EVENING, SOLIDS CLIMBING,YP AND LSRV AT PROGRAM MINIMUMS). ECD DROPS FROM 10.2 TO 9.65 AS NEW MUD DISPLACES OLD MUD FROM BACKSIDE. Printed 1/28/2011 1:52:01PM • North America -ALASKA- BP Page 7 of 7 Operation Summary Report Common Well Name: F-27 'AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 12/8/2010 End Date: X3-00Y25-C(1,205,177.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:20 - 19:15 1.92 DRILL P PROD1 DRILL AHEAD FROM 11657'MD. FS 1.45 BPM AT 2580 PSI W/9.65 PPG ECD. 19:15 - 20:35 1.33 DRILL P PROD1 WIPER TO WINDOW FROM 11800' PVT 328 BBLS,IA 0,OA 10 20:35 - 22:00 1.42 DRILL P PROD1 DRILL AHEAD.FS 2700 AT 1.5 BPM,ECD 9.73 UP WT 35K,DWN WT 16K. 22:00 - 22:50 0.83 DRILL P PROD1 WIPER TO WINDOW FORM 11950'. OPEN PIPE SHED DOORS TO LOAD LINER. INSIDE TEMP DROPPED TO-30F PRETY FAST. SLB CTDS COUNTER GOT OFF BY+16'. RESET AND WAS OK WHEN WARMED BACK UP. LOADED ALL BUT 9 JTS OF LINER WHEN LOADER GOT A FLAT TIRE. SHOULD BE OK SINCE WE ORDERED 14 SPARES. 22:50 - 23:40 0.83 DRILL P PROD1 LOG GR TIE AT 10590'WITH A+6' CORECTION. 23:40 - 00:00 0.33 DRILL P PROD1' DRILL AHEAD AT 12030'.FS 2800 AT 1.5 BPM. PVT 305,IA 92,OA 114. 12/27/2010 00:00 - 00:50 0.83 DRILL P PROD1 DRILL AHEAD TO 12,100'.FS 2800 AT 1.5 BPM. PVT 305,IA 92,OA 114. 00:50 - 02:40 1.83 DRILL P PROD1 WIPER TO WINDOW. 02:40 - 03:40 1.00 DRILL P PROD1 nRu I AHFAIl TC)Tr)AT 12 225' FS 2800 AT 1.5 BPM. PVT 297, IA 166,OA 187. ROP 148 FPH.ECD 9.84 PPG. 03:40 - 05:30 1.83 DRILL P PROD1 WIPER TO WINDOW. 05:30 - 09:45 4.25 DRILL P PROD1 PUMPING LINER RUNNING PILL. 1.48 BPM. IA 215,OA 243 POOH CIRCULATING W/FULL RETURNS. PAINT FLAGS AT 10041.81'EOP(WHITE)AND 8383.81'(YELLOW). 09:45 - 11:00 1.25 DRILL P PROD1 LD DRILLING ASSEMBLY. GRADE BIT 1-1-WT-A-X-1-ER-TD. V Printed 1/28/2011 1:52.01PM North America -ALASKA- BP Page 1 of 8 Operation Summary Report Common Well Name:F-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project: Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/27/2010 11:00 - 12:00 1.00 CASING P RUNPRD CONTINUED FROM RON EVENT 12/27/10. PREP FLOOR FOR RUNNING LINER. 12:00 - 12:30 0.50 CASING P RUNPRD PJSM FOR RUNNING LINE, DISCUSS DROPPED OBJECTS, HAND PLACEMENT, WELL CONTROL. REVIEW PROCEDURE FOR RUNNING LINER. PERFORM KWT DRILL WHILE RUNNING LINER. NORDIC CREW CHANGE. PERFORM KWT DRILL W/NEW CREW. 12:30 - 17:30 5.00 CASING P RUNPRD MU BIAS EDGE GUIDE SHOE.60 JTS 2-3/8° SLOTTED LINER, DEPLOYMENT SLEEVE AND LINER RUNNING BHA. 17:30 - 17:45 0.25 CASING P RUNPRD PU INJECTOR AND STAB ONTO WELL. 17:45 - 20:30 2.75 CASING P RUNPRD RIH,EDC OPEN 0.4 BPM,PVT 240 IA 0,OA-9 20:30 - 20:40 0.17 CASING P RUNPRD STOP AT EOP FLAG 8384'.RIH EXTRA 10'TO BE AT FLAG.CORRECTION USUALLY 6.5'. 20:40 - 21:00 0.33 CASING N DPRB 10,496.00 RUNPRD 4'HARD TAGS THEN SLIDE BY 10,489.6'.4 MORE HARD TAGS AT 10,496.5. 21:00 - 21:50 0.83 CASING N WAIT 10,496.00 RUNPRD CALL TOWN AND WAIT ON ORDERS.OPEN EDC AND CIRC.6BPM AND PULL UP HOLE SLOWLY. 21:50 - 22:00 0.17 CASING N DPRB 10,496.00 RUNPRD CLOSE EDC,SHUT DOWN PUMPS AND TAG UP AGAIN TO BE DOUBLE SURE WE HAVE LINER. NICE AND CLEAN PICKUP AND SAME UP WT. 22:00 - 23:00 1.00 CASING N DPRB 10,496.00 RUNPRD POOH TO LD LINER. PULLED UP TO THE 3-3/16 DEPLOYMENT SLEEVE AT LESS THAN 30FPM. 23:00 - 23:15 0.25 CASING N DPRB 10,496.00 RUNPRD FLOW CHECK FOR 15 MINUTES.NO FLOW. 23:15 - 00:00 0.75 CASING- N DPRB 10,496.00 RUNPRD POOH AT LESS THAN 70 FPM PUMPING.97 BPM.PVT 257 12/28/2010 00:00 - 01:07 1.12 CASING N DPRB 10,496.00 RUNPRD POH WITH 2 3/8"SLOTTED LINER BHA. 01:07 - 01:40 0.55 CASING N DPRB 10,496.00 RUNPRD BREAK OFF INJECTOR,FLOW CHECK WELL, NO FLOW. STAND BACK INJECTOR. 01:40 - 02:10 0.50 CASING N DPRB 10,496.00 RUNPRD PJSM, L/D COIL TRAC AND GS. 02:10 - 06:00 3.83 CASING N DPRB 10,496.00 RUNPRD PJSM,R/U AND UD 2 3/8"SLOTTED LINER. FUNCTION TEST BOPE. 06:00 - 09:30 3.50 CASING N DPRB 10,496.00 RUNPRD NO TELLING MARKS ON INDEXING GUIDE SHOE. CALL TOWN. WOO. 09:30 - 11:15 1.75 CASING N DPRB 10,496.00 RUNPRD MU CLEANOUT ASSEMBLY(SAME ASSEMBLY AS FINAL LATERAL DRILLING ASSEMBLY)W/ 1.1 AKO MOTOR AND USED HYC RAZOR BI-CENTERED BIT. 11:15 - 13:30 2.25 CASING N DPRB 10,496.00 RUNPRD RIH W/CLEANOUT ASSEMBLY. 13:00-RIH AT 8150'MD AT 0.45 BPM AT 1285 PSI W/FULL RETURNS. NOTE DEPTH AS RIH PAST WHITE FLAG(EIM FINDS IT 10055' CTMD EOP). Printed 1/28/2011 1:52:45PM North America -ALASKA- BP Page 2 of 8 Operation Summary Report Common Well Name:F-27 AFE No Event Type: COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI: 500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:30 - 15:45 2.25 CASING N DPRB 10,496.00 RUNPRD HARD TAG AT 10512'CTMD WHILE CIRCULATING THROUGH BIT AT 0.45 BPM. STACK 8K DOWN, NO MOVEMENT. PU CLEAN AT 32K UP WEIGHT. ONLINE AT 1.5 BPM AT 3100 PSI,TAG AND STALL AT SAME DEPTH. DOWN ON PUMP, PU CLEAN. REPEAT W/SAME RESULTS. TIME DRILL INTO FILL AT 1.5 BPM AT 2850 PSI. DRILL INTO FILL W/100 LB WOB W/FULL RETURNS. MILL AHEAD TO 10514'MD. SUDDENLY LOSE—600 PSI CIRC PRESSURE AND LOSE ALL RETURNS. RE-ESTABLISH FULL RETURNS IN—1 MINUTE. CONTINUE MILL AHEAD AT 1.49 BPM AT—3025 PSI W/NO WOB AND FULL RETURNS. PUMP 15 BBL HIGH VIS SWEEP(-80K). CONTINUE RIH SLOWLY W/NO MOTOR WORK NO WOB(HOLE SEEMS CLEAN)TO 10530'CTMD. PUH SLOWLY CHASING SWEEP. BOTTOMS UP-SEVERAL MINUTES WORTH OF VERY DARK,SOLIDS LADEN RETURNS. LOOKS LIKE SLOUGHED SHALED(VERY BLACK,GREASY,WITH LARGE,LAMINAR IRREGULAR CHUNKS). 15:45 - 18:00 2.25 CASING N DPRB 10,495.98 RUNPRD HIGH VIS PILL RETURNING TO SURFACE. SUBSTANTIAL CUTTINGS RETURNED W/THIS SWEEP. LOOKS LIKE SHALE FINES. PUH INTO 4.5"TUBING,CLEAN ENTIRE PASS. RBIH TO CONTINUE CLEANOUT. 18:00 - 22:10 4.17 CASING N DPRB 11,047.98 RUNPRD RIH TO 11,048'. ENCOUNTER SLACK OFF AND MOTOR WORK FROM 11,020'TO 11048'. -POH FOR WIPER TRIP. TIGHT HOLE WITH OVERPULL FROM 10,990'TO 10,900' -RUN BACK IN HOLE TO 11,048'. PUMP 15 BBL SWEEP WHILE POH FOR WIPER TRIP. SWEEP BROUGHT BACK 20%INCREASE IN CUTTINGS, PRIMARILY SAND WITH SOME SHALE RETURNS. 3K OVERPULL WHILE PULLING THROUGH WINDOW. -PUMP ANOTHER 15 BBL SWEEP AT 10,300' WHILE WIPING AT 35 FPM,1.8 BPM. CONTINUE WITH WIPE TO TOP OF 4 1/2" LINER TOP. -RUN BACK IN HOLE,STOP SHORT OF WINDOW. WIPE BACK TO TOL AT 28 FPM,1.9 BPM WITH GOOD RETURNS. -RUN BACK IN HOLE,ATTEMPT TO EXIT WINDOW. ENCOUNTER MOTOR WORK, SLACK OFF,LOSE RETURNS MOMENTARILY. PUH AT 30 FPM,1.4 BPM,2790 PSI. SECOND SWEEP BROUGHT BACK SAND WITH INSIGNIFICANT AMOUNTS OF SHALES. Printed 1/28/2011 1:52:45PM North America -ALASKA- BP Page 3 of 8 Operation Summary Report Common Well Name: F-27 1AFE No Event Type:COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:10 - 22:50 0.67 CASING N DPRB 11,058.98 RUNPRD RIH,EXIT WINDOW WITH NO PROBLEMS. CONTINUE TO RIH TO 11,049'. WORK TO CLEAN HOLE FROM 11,049'TO 11,058'WITH MOTOR WORK,SLACK OFF. -PU TO 11,030',RUN BACK IN SLOWLY TO 11,091'VARYING PUMPS AT.30 TO.80 BPM, 2190 TO 3000 PSI WITH VERY LITTLE MOTOR WORK. ENCOUNTERING SLACK OFF AND PUW WHILE ATTEMPTING TO WIPE UP AND DOWN THROUGH TIGHT HOLE AT 11,040-11,050'. -INABILITY TO PROGRESS PAST 11,095' WITH PUMP RATES ABOVE.8 BPM;WANTING TO PACK OFF AROUND BHA. -PU TO 10,850'AND WORK THROUGH SEVERAL TIMES WITH VARYING PUMP RATES;PROGRESS TO 11,107' 22:50 - 00:00 1.17 CASING N DPRB 11,106.98 RUNPRD WIPER'TRIP TO WINDOW. PUMP 15 BBL HI-VIS SWEEP. RIH,CLEAN HOLE TO 11,186' AT.35-45 BPM,1900-2150 PSI. SWEEP COMING AROUND BIT. OVERPULL, INCREASE IN PRESSURES WHILE WIPING UP HOLE. 12/29/2010 00:00 - 00:15 0.25 CASING N DPRB 11,169.98 RUNPRD WIPER TRIP TO WINDOW. SLIGHT INCREASE IN RETURNS WITH RETURN OF SWEEP. NO SIGNIFICANT AMOUNT OF SHALE CUTTINGS. 00:15 - 01:45 1.50 CASING N DPRB 11,169.98 RUNPRD RIH TO WINDOW. PUMP 18 BBL HI-VIS PILL. NO PROBLEMS EXITING WINDOW. CONTINUE TO RIH AT 1.44 BPM,3190 PSI,25 FPM,9.77 ECD TO 10,920'. -LOWER RATE TO.41 BPM,1780 PSI,25 FPM, 9.63 PPG ECD AND WORK THROUGH TO 11,054'. STACK OUT,CIRCULATING RATE DROPPED. POH TO 10,990'AT 1.74 BPM,3890 PSI. -RIH TO 11,050'AT.43 BPM,1880 PSI,25 FPM, 9.67 PPG ECD;STACK OUT,PU TO 11,000' -RIH AT.94 BPM,2660 PSI,25 FPM,9.82 PPG ECD TO 11,170'. WIPE TO 11,000'AT 1.6 BPM. RIH AT.95 BPM,2780 PSI,25 FPM,9.81 PPG ECD TO 11,234'. STACK OUT. 01:45 - 03:00 1.25 CASING N DPRB 11,233.98 RUNPRD WIPER TRIP TO 9000'AT 1.77 BPM,3660 PSI. WIPE DOWN TO WINDOW AT 1.76 BPM,3670 PSI. 03:00 - 04:15 1.25 CASING N DPRB 11,233.98 RUNPRD EXIT WINDOW WITH NO PROBLEMS. RIH AT .87 BPM,2380 PSI,20 FPM,9.88 PPG ECD TO 11,238'. -STACK OUT. PU TO 11,190'. PUMP 15 BBL HI-VIS SWEEP. RIH TO 11,406'AT 1.51 BPM, 3790 PSI,25 FPM,9.91 TO 10.71 PPG ECD. WIPE TO 11,200'AT 1.53 BPM,3760 PSI. -WIPE TO 11,460'AT 1.48 BPM,3680 PSI,15 FPM,10.29 PPG ECD. 04:15 - 06:00 1.75 CASING N DPRB 11,233.98 RUNPRD WIPER TRIP TO 9000'AT 1.78 BPM,3770 PSI, 25 FPM,10 PPG ECD. [ Printed 1/28/2011 1:52:45PM North America -ALASKA- BP Page 4 of 8 Operation Summary Report Common Well Name:F-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project: Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor: NORDIC CALISTA UWI: 500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 12:00 6.00 CASING N DPRB 12,227.00 RUNPRD RBIH AFTER WIPER,CLEAN AT 30 FPM AT 1.5 BPM. RIH CLEAN TO TD AT 12227'MD (CONFIRM TD AT THIS DEPTH). PUMP 15 BBL HIGH VIS SWEEP(-150K LSRV) OFF BOTTOM. SUBSTANTIAL SHALE FINES AND LARGE, LAMINAR, IRREGULAR PIECES OF SHALE COMING BACK OVER SHAKER(IN NORMAL MUD SYSTEM,NOT IN A SWEEP). PUH FOR WIPER. SEE BOBBLE AND MOTOR WORK AT 11290' MD SEE BRIEF BOBBLE OF 500 PSI MOTOR WORK AND—4K LB UP WEIGHT AT 11020'MD. POOH AT 1.48 BPM AT 3220 PSI. IAP=180 PSI. OAP=210 PSI. SUBSTANTIAL SLUG OF SHALE FINES RETURNED TO SURFACE W/ HIGH VIS PILL. SEE BOBBLE AT 10915'MD W/MOTOR WORK (-700PSI). PULL INTO CASED HOLE CLEAN ACROSS WINDOW. CIRCULATE 15 BBL HIGH VIS PILL OUT OF BIT. PULL WIPER TO ABOVE TOL,CIRCULATING THROUGH BIT AT 1.5 BPM AND PULLING AT 30 FPM. ABOVE TOL,OPEN EDC AND CIRCULATE BOTTOMS UP AT 2.1 BPM AT—4000 PSI CIRC PRESSURE. SUBSTANTIAL SLUG OF SHALE FINES RETURNED W/HIGH VIS PILL. AFTER BOTTOMS UP,CLOSE EDC. RBIH AT 30 FPM TO CONTINUE TO CONDITION HOLE WHILE WAITING ON NEW HEAVY MUD SYSTEM. Printed 1/28/2011 1:52:45PM North America -ALASKA- BP Page 5 of 8 Operation Summary Report Common Well Name:F-27 AFE No Event Type: COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 14:45 2.75 CASING N DPRB 12,227.00 RUNPRD RBIH AT 10450'MD AT 30 FPM CIRCULATING AT 1.5 BPM THROUGH BIT AT 3290 PSI W/ FULL RETURNS. PASS THROUGH WINDOW CLEANLY. SOLIDS RETURNED ARE FINE SHALES W/A GREASY TEXTURE. SET DOWN AT 10915'MD. PU, REDUCE PUMP RATE, BOBBLE THROUGH. BACKREAM AT 1.47 BPM AT 3310 PSI. SEE SMALL BLIP OF -400 PSI MOTOR WORK AND 2000 LB WEIGHT INCREASE. RBIH TO REAM AGAIN. STACK 5K(2K DHWOB)AT 11920'MD AND SEE-250 PSI MOTOR WORK. REAM AHEAD. STALL AT 10927'MD. PU TO 40K, BREAKOVER TO CLEAN UP WEIGHT OF 32K LB. RBIH CLEANLY AT 30 FPM AT 1.5 BPM. MAKE BACKREAM PASS,SEE-150 PSI MOTOR WORK AND NO WEIGHT. REAM AHEAD THROUGH SPOT AT 28 FPM,1.5 BPM, NO MOTOR WORK,SMALL 2K LB WEIGHT BOBBLES. MAKE THIRD RECIP PASS TO CLEAN. ENCOUNTER AND DRESS SIMILAR PROBLEMS AT 10980'MD,11040'MD-11080' MD, 11200'MD-11370' (WITH HARDER SPOTS AT 11230'MD AND 11300'MD). CONTINUES TO BE RATTY W/WEIGHT BOBBLES TO 11460'MD. RIH CLEANLY FROM 11460'MD TO TD AT 12227'MD. 14:45 - 18:00 3.25 CASING N DPRB 12,227.00 RUNPRD TAG TD 12227'MD. CIRCULATE OUT 15 BBL HIGH VIS SWEEP. BEGIN WIPER TO TOL. PUH AT 25 FPM AT 1.5 BPM AT 3490 PSI. BHP/ECD/PVT: 4831 PSI/10.4 PPG/243 BBL. NOTE:SUBSTANTIAL SHALE FINES RETURNED W/MUD FROM BOTTOMS-UP OF TROUBLE SPOTS. UP PASS CLEAN UNTIL 10910'MD. -800 PSI BLIP OF MOTOR WORK AT THIS DEPTH. STOP POOH AND ALLOW TO MILL OFF. CONTINUE PUH CLEANLY. HIGH VIS SWEEP REACHES SURFACE, SUBSTANTIAL CUTTINGS RETURNED, NO IRREGULAR CHUNKS, LOTS OF FINE SHALE. 18:00 - 19:30 1.50 CASING N DPRB 12,226.98 RUNPRD RIH WITH BHA TO WINDOW. CONDUCT TIE-IN. CONTINUE TO RIH AT 1.8 BPM,3460 PSI,30 FPM. NO ISSUES RUNNING TO TD OF 12,227'MD. 19:30 - 21:30 2.00 CASING N DPRB 12,226.98 RUNPRD RECIPROCATE WHILE OFFLOADING OLD MUD SYSTEM,CLEANING PITS. CONTINUE TO RECIPROCATE WHILE TAKING ON NEW 9.2 PPG MUD SYSTEM INTO PITS. DISPLACE WELL TO 9.2 PPG SYSTEM. 21:30 - 23:30 2.00 CASING N DPRB 12,226.98 RUNPRD POH DISPLACING TO NEW SYSTEM. INITIAL RETURNS FROM DISPLACEMENT BROUGHT BACK LARGE SWEEP OF SHALES. CLEANED UP QUICKLY WITH SAND RETURNS AND LIGHT AMOUNT OF SHALES. SHALE CUTTINGS ARE MUCH FINER THAN PREVIOUSLY SEEN. MOST OF THE SHALE IS CAPTURED IN POLYMER BALLS. PULL INTO WINDOW WITH MINIMAL PROBLEMS. Printed 1/28/2011 1:52:45PM North America -ALASKA- BP Page 6 of 8 Operation Summary Report Common Well Name: F-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) I _ _ Project: Prudhoe Bay Site: PB F Pad Rig Name/No. NORDIC 1 Spud Date/Time: 10/13/1986 12:00:OOAM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:30 - 00:00 0.50 CASING N DPRB 12,226.98 RUNPRD EXIT WINDOW. RIH TO TD OF 12,227'WITH NO ISSUES. 12/30/2010 00:00 - 00:30 0.50 CASING N DPRB 12,226.98 RUNPRD RIH TO TD AT 12,227'. NO PROBLEMS GETTING TO BOTTOM. SMALL AMOUNTS OF SHALE NOTICED ACROSS SHAKERS. 00:30 - 01:30 1.00 CASING N DPRB 12,226.98 RUNPRD POH LAYING IN LINER PILL. NO PROBLEMS GETTING TO WINDOW. PULL INTO WINDOW. 01:30 - 02:45 1.25 CASING N DPRB 12,226.98 RUNPRD POH UP TO TOL AT 9400'. SEND 15 BBL HI-VIS SWEEP DOWN COIL ON WAY BACK DOWN TO WINDOW. SWEEP OUT OF BIT AT 10,565'. POH CHASING HI-VIS SWEEP UP TUBING. PAINT EOP FLAG AT 10,041'CT DEPTH. 02:45 - 05:00 2.25 CASING N DPRB 12,226.98 RUNPRD OPEN EDC AT 9250', RIH TO 9550'TO CLEAN POSSIBLE DEBRIS OFF OF TOL. POH WITH EDC AT 2.25 BPM,3890-4.010 PSI. 05:00 - 06:00 1.00 CASING N DPRB 12,226.98 RUNPRD BHA AT SURFACE. JOG BACK DOWN TO 500'. CLOSE EDC. POH TO SURFACE. POP OFF INJECTOR. LD BHA. GRADE BIT 1-1,WORN CUTTERS. 06:00 - 07:15 1.25 CASING N DPRB 12,227.00 RUNPRD PREP FLOOR TO RUN LINER. 07:15 - 07:45 0.50 CASING N DPRB 12,227.00 RUNPRD PJSM FOR RUNNING LINER. DISCUSS XO FOR SAFETY JOINT,CREW RESPONSIBILITIES IN CASE OF A KICK, DROPPED OBJECTS,DRIFTING CONNECTIONS. 07:45 - 12:00 4.25 CASING N DPRB 12,227.00 RUNPRD MU AND DEPLOY 2-3/8"SLOTTED LINER. DRIFT EACH CONNECT AFTER MU. HOLD KICK DRILL AND STAB SAFETY JOINT. 12:00 - 13:00 1.00 CASING N DPRB 12,227.00 RUNPRD REMOVE AND INSPECT BHI CHECKS(133 CIRCULATING HOURS ON CHECKS). CHECKS SHOW OBVIOUS SIGNS OF DAMAGE-ONE OF THE TWO CHECKS WAS OBVIOUSLY NO LONGER OPERABLE. INSTALL NEW CHECKS AND TEST TO 300 PSI LOW/1500 PSI HIGH-PASS. Printed 1/28/2011 1.52.45PM North America -ALASKA- BP Page 7 of 8 Operation Summary Report Common Well Name: F-27 AFE No Event Type:COM-ONSHORE (CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 18:00 5.00 CASING N DPRB 12,227.00 RUNPRD BEGIN RIH W/LINER(2-3/8"BULLNOSE GUIDE SHOE,60 JTS 2-3/8"SLOTTED LINER,2.7" DEPLOYMENT SLEEVE)ON HYDRAULIC G SPEAR AND KJ ON COILTRAK. 15:30-RIH AT 8670'CTMD CIRCULATING AT 0.5 BPM THROUGH OPEN EDC AT 1300 PSI W/ FULL RETURNS. WEIGHT CHECK PRIOR TO PASSING THROUGH WINDOW-32K UP WEIGHT CLEAN. PASS THROUGH WINDOW CLEANLY. RIH WEIGHT 18K LB. TAG AT 11064'CTMD,STACK 4K LB. PU CLEAN AT 33K. RBIH CLEANLY. RIH W/LINER TO TD(FIND IT AT 12237' UNCORRECTED CTMD W/5K STACKED). WE ARE STILL CALLING OFFICIAL TD 12227'MD. CLOSE EDC. ONLINE DOWN CT THROUGH CLOSED EDC AT 1.6 BPM. PUH WHILE PUMPING,UP WEIGHT 30K. SEE INCREMENTAL 8K CHANGE IN DHWOB SENSORFAVF LINFR ON BOTTOM. PUH TO 12140'CTMD(NOTE,WILL STILL RECORD THE DEPTHS AS LISTED IN CTDS. THIS IS—100'ABOVE TOL). 18:00 - 19:00 1.00 CASING P RUNPRD OFFLOAD 9.2 PPG MUD SYSTEM FOR TRANSPORT BACK TO BAROID. CLEAN PITS. 19:00 - 21:40 2.67 CASING P RUNPRD DISPLACE MUD WITH 8.5 PPG KCL DOWN COIL. KCL BACK TO SURFACE. TAKE RETURNS TO PITS. 21:40 - 23:45 2.08 CASING P RUNPRD SWITCH TO ACTIVE TRIP TANK. BEGIN POH WITH BHA. FLOW CHECK AT 8000'AND 7000'. NO FLOW. CONTINUE TO POH TO SURFACE. 23:45 - 00:00 0.25 CASING P RUNPRD BHA AT SURFACE. POP OFF INJECTOR. LD BHA. 12/31/2010 00:00 - 00:15 0.25 WHSUR P POST LD BHA. MU FREEZE PROTECT BHA. 00:15 - 02:00 1.75 WHSUR P POST FREEZE PROTECT WELL TO 2500'MD(2431' TVD)WITH 50 BBLS 60/40 METHANOL MIX. FLOW CHECK-STATIC. 02:00 - 04:30 2.50 WHSUR P POST CLOSE MASTER VALVE,CIRCULATE WARM FLUIDS TO PREVENT COIL FROM FREEZING WHILE NITROGEN BLOW DOWN CREW GETS TO LOCATION AND RIGS UP. PJSM ON USE OF NITROGEN,WEATHER. BLOW DOWN REEL WITH NITROGEN. RD NITROGEN CREW. 04:30 - 05:00 0.50 WHSUR P POST POP OFF INJECTOR,LD FREEZE PROTECT BHA. 05:00 - 08:30 3.50 WHSUR P POST PULL CT ACROSS AND SECURE TO REEL. 08:30 - 10:30 2.00 WHSUR P POST PREP FOR REEL SWAP. 10:30 - 12:30 2.00 WHSUR P POST PJSM FOR LIFTING OPERATIONS. PU DSM LUBRICATOR. PJSM FOR RU LUBRICATOR AND SETTING BPV. 12:30 - 13:30 1.00 WHSUR P POST TEST LUBRICATOR. SET BPV. 13:30 - 17:30 4.00 WHSUR P POST PJSM ON REEL SWAP. CONDUCT REEL SWAP. 17:30 - 22:00 4.50 BOPSUR P POST OPEN DOORS ON BOP AND INSPECT RAMS. ND BOP AND STAND BACK IN CELLAR. SECURE HOSES FOR MOVE. Printed 1/28/2011 1:52:45PM • North America -ALASKA- BP Page 8 of 8 Operation Summary Report Common Well Name: F-27 AFE No Event Type: COM-ONSHORE(CON) Start Date: 12/15/2010 End Date: X3-00Y25-C(376,334.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 10/13/1986 12:00:00AM Rig Release: 1/1/2011 Rig Contractor:NORDIC CALISTA UWI:500292165900 Active Datum:28:27 10/13/1986 00:00 @67.90ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 DEMOB P POST PREPARE RIG FOR MOVING OFF OF WELL. CLEAN PITS, DISCONNECT LINES, SECURE HOSES AND ELECTRICAL LINES. RELEASE RIG AT MIDNIGHT. Printed 1/28/2011 1:52:44PM • F-27B, Well History Date Summary 12/23/10 T/I/O=Vac/0/0. Pulled 6" CIW "J"TWC#417 thru stack for Nordic# 1. Used 3- 5' extensions and 1 -2', tagged at 118". No problems. 12/31/10 T/I/O=0/0/0 Set 6" CIW J BPV @ 114"w/3-5', 1-1.5', 1-1' ext. RKB=25.90' + 14"Tested lubricator to 300 psi low and 3500 psi high.(passed) Page 1 of 1 • RIM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-27 - Slot 27 500292165900 F-27B Survey: MWD Survey Report - Geographic 27 December, 2010 4L ti 4 =r. >r.r BAKER 3, HUGHES Survey Report- Geographic i bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-27-Slot 27 Project: Prudhoe Bay TVD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Site: PB F Pad MD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Well: F-27 North Reference: True Wellbore: F-27B Survey Calculation Method: Minimum Curvature Design: F-27B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29ft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70ft Longitude: 148°46'31.468 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-27 API No 500292165900 Well Position +NI-S 0.00 ft Northing: 5,973,783.00 ft Latitude: 70°20'7.295 N +E/-W 0.00 ft Easting: 652,650.00 ft Longitude: 148°45'41.404 W I Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 35.50 ft Wellbore F-27B API No 500292165902 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 12/15/2010 21.88 80.96 57,709 Design F-27B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,541.10 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 32.40 0.00 0.00 46.55 Survey Program Date: 12/27/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,400.00 Survey#2 GYD CT CMS(F-27) GYD-CT-CMS Gyrodata cont.casing m/s 10,414.00 10,541.10 MWD(F-27A) MWD MWD-Standard II 10,571.00 12,227.00 MWD(F-27B) MWD MWD-Standard 12/27/2010 3:27:13PM Page 2 COMPASS 2003.16 Build 73 • BAKER HUGHES Survey Report- Geographic J by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-27-Slot 27 Project: Prudhoe Bay TVD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Site: PB F Pad MD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Well: F-27 North Reference: True Wellbore: F-27B Survey Calculation Method: Minimum Curvature Design: F-27B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,541.10 75.32 71.37 9,047.87 2,219.78 3,722.38 5,976,077.92 656,326.15 70°20'29.117 N 148°43'52.666 W TIP 10,571.00 83.08 73.07 9,053.46 2,228.74 3,750.33 5,976,087.44 656,353.91 70°20'29.205 N 148°43'51.849 W KOP 10,605.56 84.59 56.82 9,057.20 2,243.25 3,781.34 5,976,102.58 656,384.62 70°20'29.348 N 148°43'50.943 W 10,635.38 86.87 41.51 9,059.43 2,262.63 3,803.77 5,976,122.42 656,406.65 70°20'29.538 N 148°43'50.288 W 10,665.56 88.71 24.89 9,060.61 2,287.78 3,820.22 5,976,147.89 656,422.58 70°20'29.786 N 148°43'49.807 W 10,695.40 89.08 5.37 9,061.19 2,316.44 3,827.97 5,976,176.70 656,429.75 70°20'30.068 N 148°43'49.580 W 10,725.10 90.37 348.02 9,061.33 2,345.98 3,826.26 5,976,206.20 656,427.44 70°20'30.358 N 148°43'49.629 W 10,755.08 91.75 330.53 9,060.77 2,373.90 3,815.70 5,976,233.90 656,416.31 70°20'30.633 N 148°43'49.938 W 10,785.77 91.63 314.20 9,059.86 2,398.12 3,797.03 5,976,257.72 656,397.15 70°20'30.871 N 148°43'50.483 W 10,817.49 94.08 310.56 9,058.28 2,419.47 3,773.63 5,976,278.59 656,373.33 70°20'31.081 N 148°43'51.166 W 10,845.69 95.62 308.37 9,055.90 2,437.32 3,751.94 5,976,296.00 656,351.28 70°20'31.257 N 148°43'51.799 W 10,875.75 97.38 306.55 9,052.49 2,455.49 3,728.24 5,976,313.68 656,327.21 70°20'31.436 N 148°43'52.491 W 10,905.91 95.87 305.51 9,049.01 2,473.11 3,704.01 5,976,330.80 656,302.64 70°20'31.609 N 148°43'53.199 W 10,935.71 92.51 305.47 9,046.84 2,490.36 3,679.82 5,976,347.56 656,278.10 70°20'31.779 N 148°43'53.905 W 10,965.65 89.72 305.21 9,046.25 2,507.67 3,655.40 5,976,364.37 656,253.33 70°20'31.949 N 148°43'54.618 W 10,995.91 90.34 302.61 9,046.24 2,524.55 3,630.29 5,976,380.73 656,227.89 70°20'32.115 N 148°43'55.352 W 11,025.59 90.86 300.48 9,045.93 2,540.08 3,605.00 5,976,395.74 656,202.29 70°20'32.268 N 148°43'56.090 W 11,055.51 90.37 297.50 9,045.61 2,554.58 3,578.83 5,976,409.70 656,175.83 70°20'32.411 N 148°43'56.854 W 11,085.53 90.52 295.22 9,045.37 2,567.91 3,551.93 5,976,422.48 656,148.67 70°20'32.542 N 148°43'57.640 W 11,116.09 91.10 292.89 9,044.94 2,580.36 3,524.03 5,976,434.36 656,120.53 70°20'32.665 N 148°43'58.455 W 11,145.95 90.43 290.42 9,044.54 2,591.38 3,496.29 5,976,444.81 656,092.56 70°20'32.773 N 148°43'59.265 W 11,176.07 90.28 287.62 9,044.35 2,601.19 3,467.81 5,976,454.04 656,063.90 70°20'32.870 N 148°44'0.097 W 11,207.21 91.26 286.88 9,043.94 2,610.43 3,438.08 5,976,462.67 656,033.98 70°20'32.961 N 148°44'0.966 W 11,235.35 91.20 289.62 9,043.33 2,619.24 3,411.36 5,976,470.93 656,007.09 70°20'33.047 N 148°44'1.746 W 11,266.33 90.15 289.08 9,042.97 2,629.50 3,382.13 5,976,480.60 655,977.67 70°20'33.149 N 148°44'2.600 W 11,296.13 90.58 287.78 9,042.78 2,638.92 3,353.86 5,976,489.44 655,949.21 70°20'33.241 N 148°44'3.425 W 11,324.75 90.71 285.35 9,042.46 2,647.08 3,326.44 5,976,497.04 655,921.63 70°20'33.322 N 148°44'4.227 W 11,357.27 89.54 283.38 9,042.38 2,655.15 3,294.93 5,976,504.46 655,889.97 70°20'33.401 N 148°44'5.147 W 11,386.13 89.69 281.52 9,042.58 2,661.37 3,266.76 5,976,510.11 655,861.67 70°20'33.462 N 148°44'5.970 W 11,418.53 89.66 279.58 9,042.76 2,667.30 3,234.90 5,976,515.39 655,829.71 70°20'33.521 N 148°44'6.900 W 11,445.93 88.74 275.00 9,043.14 2,670.78 3,207.74 5,976,518.31 655,802.48 70°20'33.555 N 148°44'7.694 W 11,485.85 89.48 272.54 9,043.76 2,673.40 3,167.91 5,976,520.13 655,762.61 70°20'33.581 N 148°44'8.857 W 11,518.71 90.06 269.98 9,043.90 2,674.12 3,135.06 5,976,520.18 655,729.76 70°20'33.588 N 148°44'9.817 W 11,548.69 90.31 267.19 9,043.80 2,673.38 3,105.09 5,976,518.83 655,699.81 70°20'33.581 N 148°44'10.692 W 11,575.83 90.28 265.30 9,043.66 2,671.60 3,078.01 5,976,516.50 655,672.77 70°20'33.564 N 148°44'11.484 W 11,608.15 91.01 262.54 9,043.30 2,668.18 3,045.88 5,976,512.43 655,640.72 70°20'33.530 N 148°44'12.422 W 11,636.09 90.58 260.89 9,042.91 2,664.16 3,018.24 5,976,507.84 655,613.17 70°20'33.491 N 148°44'13.230 W 11,666.35 90.12 257.55 9,042.72 2,658.50 2,988.52 5,976,501.58 655,583.57 70°20'33.435 N 148°44'14.098 W 11,695.25 90.00 253.14 9,042.69 2,651.19 2,960.56 5,976,493.70 655,555.77 70°20'33.364 N 148°44'14.915 W 11,725.55 89.88 248.66 9,042.73 2,641.28 2,931.94 5,976,483.21 655,527.36 70°20'33.266 N 148°44'15.751 W 11,754.81 90.92 245.11 9,042.52 2,629.79 2,905.03 5,976,471.18 655,500.69 70°20'33.153 N 148°44'16.537 W 11,784.75 90.77 239.56 9,042.08 2,615.90 2,878.53 5,976,456.75 655,474.48 70°20'33.017 N 148°44'17.312 W 11,814.69 90.40 233.32 9,041.77 2,599.35 2,853.59 5,976,439.71 655,449.89 70°20'32.854 N 148°44'18.041 W 11,844.51 89.94 227.67 9,041.68 2,580.39 2,830.59 5,976,420.28 655,427.28 70°20'32.668 N 148°44'18.713 W 11,874.57 88.68 221.83 9,042.05 2,559.06 2,809.44 5,976,398.52 655,406.57 70°20'32.458 N 148°44'19.331 W 11,917.77 89.91 219.99 9,042.58 2,526.41 2,781.16 5,976,365.31 655,378.95 70°20'32.137 N 148°44'20.157 W 11,944.79 89.20 221.51 9,042.79 2,505.94 2,763.52 5,976,344.49 655,361.74 70°20'31.936 N 148°44'20.673 W 11,975.07 87.57 224.81 9,043.64 2,483.87 2,742.82 5,976,322.00 655,341.49 70°20'31.719 N 148°44'21.278 W 12,005.09 90.86 230.21 9,044.05 2,463.60 2,720.70 5,976,301.29 655,319.79 70°20'31.520 N 148°44'21.924 W 12,034.97 92.18 236.07 9,043.26 2,445.69 2,696.81 5,976,282.90 655,296.27 70°20'31.344 N 148°44'22.622 W 12,065.19 91.60 240.75 9,042.26 2,429.88 2,671.09 5,976,266.56 655,270.88 70°20'31.188 N 148°44'23.374 W 12,095.03 90.61 246.45 9,041.69 2,416.62 2,644.38 5,976,252.76 655,244.45 70°20'31.058 N 148°44'24.154 W 12,126.93 87.67 251.52 9,042.17 2,405.18 2,614.61 5,976,240.72 655,214.93 70°20'30.945 N 148°44'25.024 W 12/27/2010 3:27:13PM Page 3 COMPASS 2003.16 Build 73 BAKER Survey Report-GeographicswoD) 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-27-Slot 27 Project: Prudhoe Bay TVD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Site: PB F Pad MD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drillir Well: F-27 North Reference: True Wellbore: F-27B Survey Calculation Method: Minimum Curvature Design: F-27B Database: EDM.16-ANC Prod-WH24P 'Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) ( ) (ft) (ft) (ft) (ft) (ft) Latitude Longitude I 12,156.93 87.88 255.58 9,043.33 2,396.70 2,585.87 5,976,231.65 655,186.36 70°20'30.862 N 148°44'25.864 W 12,184.85 88.01 259.49 9,044.33 2,390.68 2,558.63 5,976,225.08 655,159.25 70°20'30.803 N 148°44'26.659 W 12,198.53 88.19 261.90 9,044.79 2,388.47 2,545.14 5,976,222.60 655,145.81 70°20'30.781 N 148°44'27.054 W 12,227.00 88.19 261.90 9,045.69 2,384.46 2,516.97 5,976,218.01 655,117.73 70°20'30.742 N 148°44'27.877 W TD 12/27/2010 3:27:13PM Page 4 COMPASS 2003.16 Build 73 sumf [E ALAsEA D SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-27B BP Exploration (Alaska), Inc. Permit No: 210-161 Surface Location: 2249' FSL, 2195' FEL, SEC. 02, T11N, R13E, UM Bottomhole Location: 4823' FSL, 340' FWL, SEC. 01, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. incerely, Daniel T. Seamount, Jr. Chair DATED this° day of November, 2010. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKARECEIVE*� ALAS -AND GAS CONSERVATION COMM! J PERMIT TO DRILLtek NOV 0 3 2010 � �� 20 AAC 25.005 g la.Type of work: lb.Proposed Well Class: f1� r;j1 � �Ii { � ' 0 Development Oil 0Service-Winj 0Single Zone � ' ' ' ' • ❑ Drill 0 Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply ❑Multiple Zone 0 CoallkOherag Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp Shale Gas 2. Operator Name: 5.Bond: 0 Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU F-27B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12230 TVD 8990'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028280 2249'FSL,2195'FEL, SEC.02,T11N, R13E, UM -- Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4420'FSL, 1546'FWL,SEC.01,T11N, R13E, UM November 27,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4823'FSL,340'FWL, SEC.01,T11N, R13E, UM 2560 8350' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 67.90' feet 15.Distance to Nearest Well Open Surface: x- 652650 y-5973783 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 256' 16.Deviated Wells: Kickoff Depth: 10600 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 93 degrees Downhole: 3180 Surface: 2300 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 3" 2-3/8" 4.7# L-80 STL 1830' 10400' 8970' 12230' 8990'ss Uncemented.slotted liner ' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 12415 9037 None 12379 9038 None Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 8 cu vds Concrete 110' 110' Surface 2696' 13-3/8" 3351 cu ft AS III.465 cu ft AS ll 2696' 2696' Intermediate 9736' 9-5/8" 575 cu ft Class'G' 9736' 8456' Production Liner 928' 7" 327 cu ft Class'G' 9491'- 10419' 8258'-8985' Liner 2924' 3-1/2"x 3-3/16"x 2-7/8" 185 Cu ft Class'G' 9491'- 12415' 8258-9037' Perforation Depth MD(ft): 10720'-12365' Perforation Depth ND(ft): 9050'-9038' 20.Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Amanda Rebol,564-5543 Printed Name John Mu Title Engineering Team Leader / 6/0 Prepared By Name/Number Signature 1. Phone 564-4711 Date f Elizabeth Barker,564-4628 Commission Use Only Permit To Drill API Number: Permit Approval Date: See cover letter for Number: �/J/6f 50-029-21659-02-00 \‘ � yC) other requirements Conditions of Approval: If box is checked,well many not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales:,.,/ Other: 3.�°O /S`- 130 I_ 5 f Samples Req'd: 0 Yes "No Mud Log Req'd: ❑ Yes Olio - 2 S 6 6 /o S< /4n n ..L..r, S'("' 63 H,S Measures: El/Yes 0 No Directional Survey Req'd: 0 Yes 0 No / //cP,/>dDate APPROVED BY ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 montrirR tr ati Qf�p TI. (20 AAC 25.005(g)) Submit In Duplicate GG NAL //c5-',C) ,osie i0-7/0 F-27B - Coiled Tubing Drilling To: Alaska Oil&Gas Conservation Commission From: Amanda Rebol bp CTD Engineer Date: October 26, 2010 Re: F-27B Permit to Drill Application Approval is requested for a permit to drill a through-tubing CTD sidetrack from F-27A. This well will exit 3- 3/16"liner off a packer whipstock,kicking out in zone and drilling—1640' of horizontal wellbore,targeting reserves in Zone 1A. This sidetrack will effectively replace the high GOR parent wellbore and drain existing reserves in a—25 acre target in central F-Pad. Coil Tubing Sidetrack: Drill and Complete Summary Pre-Rig Work: (scheduled to begin November 10,2010) 1. 0 MIT-IA 3000psi 2. 0 MIT-OA 2000psi 3. F PPOT-T/IA 4. C Drift for whipstock to 10,600' • 54-4-Ci1os"tt)`µ 5. W Check lock-down screws;torque to spec 6. V Set TWC,pressure test tree,pull TWC 7. 0 Remove wellhouse, level pad, remove flow line 8. V Set TWC(within 24 hours of MIRU Nordic 1) Rig Work: (scheduled to begin on November 27,2010) Ptd 1. MIRU and test BOPE to 250 psi low and 3500 psi high.-is .5e} ?K2 4Jh)u/ t.. e 2. Mill 2.74"window at 10,600' through 3-3/16" liner 3. Drill Build: 3"OH, 315' (42 deg/100 planned) 4. Drill Lateral: 3"OH, 1315' (12 deg/100 planned) Vas 5. Run 2-3/8" slotted liner, leaving TOL at 10,400' / j A 6. Freeze protect well, RDMO Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Pu11 TWC 41. F-27B - Coiled Tubing Drilling Mud Program: • Well kill: 8.6 ppg seawater/brine • • Milling/drilling: 8.6 ppg Power-vis • Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind&Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3" 10,590'— 12,230' MD Casing Program: • 2-3/8" 4.7#,L-80,STL slotted liner 10,400' — 12,230' MD • Well Control: • BOP diagram is attached. • Pipe rams,blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 93 deg • • Magnetic and inclination surveys will be taken every 30 ft.No gyro will be run • Distance to nearest property line—8350' • Distance to nearest well within pool—256' (F-IIA;this well is beyond the TD of F-27B) Anticollision Summary • No anti-collision issues ' Logging • MWD directional and GR will be run over all of the open hole section. Hazards • F-Pad is considered a high-level H2S pad.The maximum recorded H2S level on F-Pad is 160ppm on F-24 (4/15/2007). More recent readings on nearby surface and bottomhole locations are lower,in the 10-13ppm range, with the most recent parent wellbore reading at 6ppm on 7/2/2008. Take all necessary precautions while working on an H2S site. • Lost circulation risk is considered low;there are no fault crossings planned while drilling this well,and there are no significant lost circulation events in surrounding wellbores targeting the same zone. Even though there are no losses anticipated,always monitor for potential losses while drilling. Reservoir Pressure • Reservoir pressure is estimated to be 3,180 psi at 8,800'TVDss(6.95 ppg EMW). Maximum surface pressure with gas(0.10 psi/ft)to surface is 2,300 psi. Amanda Rebol CTD Engineer 564-5543 TREE= 6"McEVOY STES: WELLHEAD= McEVOY F 27A ACTUATOR= OTIS KB. ELEV= 67.9' BF. ELEV= 38.41' KOP= 10414' Max Angle=94.5 @ 11256' 0 1 208T —14-1/2"OTIS SSSV NIP, ID=3.813" Datum MD= 10269' Datum TV= 8800'SS GAS LIFT MANDRELS 13-3/8"CSG,68#,L-80,ID=12.415" —r 2694' ST MD ND DEV TYPE VLV LATCH PORT DATE 7 2985 2984 6 OTIS DMY RM ' 0 09/23/10 1 I 6 5058 4793 39 OTIS DMY RM r 0 09/23/10 5 6575 5952 41 OTIS DMY RA ' 0 09/23/10 4 7511 6676 38 OTIS DMY RA r 0 09/23/10 Minimum ID = 2.37" @ 10600' 3 8094 7132 39 OTIS DMY RA F 0 09/23/10 2-7/8" STL LINER 2 8714 7621 37 OTIS DMY RA 0 09/23/10 1 9215 8031 34 OTIS DMY RA 0 09/23/10 I I 1 9361' H4-1/2"OTIS XA SLIDING SLEEVE 9419' —TIW SBR TBG SEAL ASSY [ 9434' —9-5/8"X 4-1/2"TIW HBBP PKR, ID=4.75" g I I 9475' —14-1/2"OTIS X NIP, ID=3.813" TOP OF 7"LNR — 9490' 9491' —I BOT DEPLOY SLEEVE, ID=3.00" ,-_ 9508' —4-1/2"OTIS XN NIP, MILLED(08/21/05) ID=3.80"(BEHIND PIPE) 4-1/2"TBG, 12.6#,L-80, .0152 bpf, ID=3.958" —1_91p:_1.-.. ......... 9510' —13-1/2"HOWCO X NIP, ID=2.813" 3-1/2"LNR,8.81#, L-80 STL, .0087 bpf, ID=2.990" — 9543' / \ 9539' —4-1/2"BAKER SOS TBG TAIL 9-5/8"CSG,47#,L-80, ID=8.681" —I 9734' _4 \ 9544' —I ELMD H LOGGED 11/06/86 9543' —3-1/2"X 3-3/16"XO, ID=2.867" ESTIMATED TOP OF CEMENT — 10300' • 10192' --I MARKER JOINT 1 �� 7"x 4-1/2"MECHANICAL WS(08/19/05) H 10414' •;i 4. 4,4 MILLOUT WINDOW (F-27A) 10419'-10426' RA PIP TAG(8/19/05) 1 10424' 1--^- �•-• PBTD 10626' �� ��. 10600' —3-3/16"X 2-7/8"XO, ID=2.372" I 14 7"LNR,26#,L-80,IJ4S, .0383 bpf,ID=6.276" — 10670' • AvAvar • PERFORATION SUMMARY 3-3/16"LNR,6.2#, L-80 TCII, -1 10600' '41REF LOG:MWD GR LOG 08/30/05 .0076 bpf, ID=2.80" AA_ 4,_ ANGLE AT TOP PERF:94© 10720' .40. Note: Refer to Production DB for historical perf data PBTD — 12379' X40 SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10720- 10990 0 09/01/05 2" 6 11060- 11190 0 09/01/05 2-7/8"LNR,6.16#,L-80 STL, .0058 bpf, ID=2.441 12415' 2" 6 11290-11370 0 09/01/05 2" 6 11480- 11720 0 09/01/05 2" 6 11890- 12180 0 09/01/05 2" 6 12270- 12365 0 09/01/05 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/31/86 ORIGINAL COMPLETION WELL: F-27A _09/02/05 NORDIC 1 CTD PERMIT No: 2051240 08/25/05 JLM/TLH MILLED NIPPLE(08/21/05) API No: 50-029-21659-01 09/09/05 KSB/TLH GLV C/O SEC 2,T11 N,R13E,2249'FSL&2195'FEL 11/16/06 CAZ/PJC DRLG DRAFT CORRECTION 09/26/10 MSS/PJC GLV C/O(09/23/10) BP Exploration (Alaska) TREE= 6"McEVOY ELLHEAD= cEVOY F. STES: WM ACTUATOR= OTIS Proposed CTD Sidetrack ' KB.ELEV= 67-9' BF.ELEV= 38.41' KOP= 10414' Max Angle=94.5 @ 11256' 208T —14-1/2"OTIS SSSV NIP,ID=3.813" O Datum MD= 10269' Datum TV= 8800'SS GA S LIFT MA NDRELS 13-3/8"CSG,68#,L-80,ID=12.415" —I 2694' ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 2985 2984 6 OTIS DMY RM IF 0 09/23/10 LI 6 5058 4793 39 OTIS DMY RM ' 0 09/23/10 5 6575 5952 41 OTIS DMY RA ' 0 09/23/10 4 7511 6676 38 OTIS DMY RA ' 0 09/23/10 Minimum ID =2.76" @ 9543' 3 8094 7132 39 OTIS DMY RA ' 0 09/23/10 3-3/16" TCII LNR 2 8714 7621 37 OTIS DMY RA 0 09/23/10 1 9215 8031 34 OTIS DMY RA 0 09/23/10 I I9361' —I4-1/2"OTIS XA SLIDING SLEEVE I 9419' —ITWSBRTBGSEALASSY I C9434' H9-5/8"X4-1/2"TIW HBBP PKR,ID=4.75" X 1 I 9475' H4_1/2-OTIS X NIP, ID=3.813" I TOP OF T'LNR H 9490' _ 9491' I-1 BOT DEPLOY SLEEVE,ID=3.00" I ill 9508' 14-1/2"OTIS XN NIP,MILLED(08/21/05) ID=3.80"(BB-IIND PIPE) 4-1/2"TBG,12.6#,L-80,.0152 bpf, ID=3.958" 9539' 1 - 9510' I—3-1/2"HOWCO X NIP,ID=2.813" 3-1/2"LNR,8.81#,L-80 STL, .0087 bpf,ID=2.990" 9543' / \ 9539' I-14-1/2"BAKER SOS TBG TAIL 9-5/8"CSG,47#,L-80, ID=8.681" H 9734' \ 9544' I�ELMO TT LOGGED 11/06/86 3-3/16"LNR,6.2#,L-80 TCII, .0076bpf, ID=2.80" H 10600' • � 9543' IH3-1/2"X 3-3/16"XO, ID=2.86T' I ESTIMATED TOP OF CEMENT H 10300' ' i �..I I I L...."-'..--1 10192' MARKER JOINT 7"x 4-1/2"MECHANICAL WS(08/19/05) —1 10414' I �I • MILLOUT WINDOW (F-27A) 10419'-10426' RA PIP TAG(8/19/05) H 10424' rte. j•_• •• Imommuri • T LNR,26#,L-80,IJ4S,.0383 bpf,ID=6.276" 1 10670' I •4101•••�• 10400' I ITop of 2-3/8"slotted Nner I- �� 10590' I-13-3/16"packer whipstock PERFORATION SUMMARY REF LOG: MWD GR LOG 08/30/05 ANGLE AT TOP PERF:94 @ 10720' o Note: Refer to Production DB for historical perf data 86 _ / / ��' SEE SPF INTERVAL Opn/Sqz DATE l' 2" 6 10720-10990 o o9/o1/os 2-3/8" slotted liner to 12230' 2" 6 11060-11190 0 09/01/05 2" 6 11290-11370 0 09/01/05 10600' I-13-3/16"X 2-7/8"XO, B=2.372" 2" 6 11480-11720 0 09/01/05 2" 6 11890-12180 0 09/01/05 I 2" 6 12270-12365 0 09/01/05 2-7/8"LNR,6.16#, L-80 STL,.0058 bpf,ID=2.441 H 12415' 1 '470: DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/31/86 ORIGINAL COMPLETION 10/04/10 MSE PROPOSED CTD SIDETRACK WELL: F-27 09/02/05 NORDIC 1 CTD PERMIT No: 08/25/05 JLM/TLH MILLED NIPPLE(08/21/05) API No: 50-029-21659- 09/09/05 KSB/TLH GLV C/O SEC 2,T11 N,R13E,2249'FSL&2195'FEL 11/16/06 CAZ/PJC DRLG DRA FT CORRECTION 09/26/10 MSS/PJC GLV C/O(09/23/10) BP Exploration (Alaska) W 41W `Mb 4= d m W H z t 0 Q. a) et I. c' in •_ c c 1 ca cn Q a _I W Q H Z cau) ,� G) � s o Q N M o N Ca C iim s 0 m. �. �oaco a Q- . a in 0 -C4 LL , m CU 0 Zaa � a CO °° N • V/ 1___ — a) o o LO O Cr) OPo O O o Co CD r: W = = a) N O CO o o O L- O v N- a O 6 O O a) h h N NO In 6 In „VINO "O "O N 6) CD 00 00 0o C. aD m m m CA m CO Z O) O) 1 0 .r = = N O O co O 6) O co co (n 6) N- V CO CO V CO h 0) h h 00 4 h 6) N- h CO CO CO 6) co 6) h M Q (0 CO L 6) W h M 6) CU h (n M M M (0 a a`J 0 '� V U) CO N- V LU 10 U) co O 6) co Z 11 V L I In (t) CO (O CO CO CO CO LA LO V M 0 0 o y to$ c. r) ; ; ; ; c' rr ; ; ; ; ; M h o OO N (n O o0 6) 6) N NN N .- V V V CI- N N E N 0f 0 O (n CO ,--NI- ❑W 6 VCo co V co N- N CO 0) N- CO 10 C) .i 7 1 6) 4 O co CO h CO co M 6) 6) C L „- in r co 6) CO CCO W CO CNO M N V O N w d C Co co co CO 7 7 V V R V CO N L- O CO CO CO (O (O CO (O (O Cfl (fl (D (D (D o 2 '�= In in In U) U) In U) U) In 1!) In In U) IU rt C CO" CD CO CO (O CO CO CO CO CO CO CO CO 0 (O a) o w c a)0• I 'v c o ac) 3 _ Q ` c N V N 6) co to Cn co o CO O (n 06 00 Cr N N y. R N U') CO CO In CO h CO Lt In N O 6) co CO o .2 a) U I) CO (Ni In W N co M CO O M N 6 -C U d N Q' T W C 0) 00 CO 6) CO In 6) Cr V 6) co V oO 0 IX t a) .0 .N C o 0 O O ,- N N N CO CO CO V V 4) p > 0 O = W o 'O 'O ,2 v (h0 Cho N- Cho Cho N- Cho ch0 6.N- 05 N- ch0 (hD ChD (hD J I- Z N G m m O rn 6) rn rn 6) 6) rn 6) 6) rn 6) 6) 6) CO Wa O Uo c c Z lA (ri In In In Iri (ri id In U) 1.6n ICJ LI) Z C .Q' -0p CO N 6) N 0 CO 0 (N CO N N 0 O ❑ ❑ CO Cb CO 6) CO CO N- coM U) co I!) h 6) V N N N N In In h 0O (O N h O ti) CL W O CO CD 6) 0 h 6) CO 6) h V CO CO CO CO /y V V 7 In U) (n U) In In IP) In 4 CO N LW In U) 1.6 In In 6 In In 6 In In In Ln U7 F- 2 Z L W ID L CO 6) co co 6) h In (fl co Co O ! IIco N CO In V M O V (n O M V a0 V O V ) IP) V to 0 I!) O O CD 6) O V V In In (D O CO CD h YM M O. 03 I- o2 2 Z— (0 CO CO N CO 0 CO CO CO h LO N 00 V N 6) co co to CO 0 V• CO Inh h N CO •a) a) N 6) O Cn N co co coD 6) 6) 6) 6) 6) co CD co) co Co fn a) a) m a) a) ca a) a) a) a) ca a) a) carn n G 06 coCO O W CD a0 00 c coao O O N > CL I- U) 2 o N- N N N 0 N CO CD CO N In h M In O 6) O ,- co co V co V In N Cr h • U M M M N V M 4 N 6) o V V' N N O 0 h h N- N- M M M M CO 0 C0 CO N N N d -2 >- Q m y_ m O IV O h N Q._. O N LI- C•1 v (n N a) N ❑❑ M 5 O 3 R co o o O LO LU 0 o 0 h CO 0 COQ CO 2 n- o N- h h O O co V. (V O 01 O M (O ( O CD O 6) O O6 M M N6 O I (p ', a) 0 0 co 0o 0o c0 coN 0 coO m O 6) O J 6) 6) m CO 03 GI OE V In N Com. 0 O d 0) !, f'�' O O 0 0 LL 0- m C') O r o 7 m N N N Q Z d d LL. CL d CI o O o °' _ _ _ O O 000 O 0 0 0 DO 0 O 0 N0 0 In O O O o O o O m co W O m O co In d' d ,- o o 0 0 . o o v o v o v ... o 0 00 !n /ilk N- rn o 0 o In 6) o In o 0 0 o N- p [�f) Cr LO Cl. CO CO .0 h 1� h co CO 6) O) L o ,- c o c o o to p o a 0 o co 0 0 0 0 0 o c � o G0Iv J O C LL C H� Y � W � � N � t0� W O' N y .. a Cah. E• .d. 61 N d 3 o CO t) am33o co 0. 0 il.IIIN O� O O) N. O O) co O O) O) o O co N. W 7, 7 0 6) co o O) co o O) co 0 0) co O 0 - N N O (A 0 O 6) 0 O 0 O O O) 6) O O) Whs. -a -a Q) 6) 0 co co 6) CO co 0 M 0 (A o0 CO 0 a0 m \�o U •U t0).� Co M W C C U-�"'CD CD CO CD Z 0) 0) O = = N O O CO CO 0 N. CO N- CO 6) 00 6) U) 6) U) co N. N. N CO N N 0 U) CO CO V CO N U) 00 N CO CO N N CO Q CD (.10 .0 (O cO CO O O C) O N N M 7 7 in 0 N- 1` 0. V ©�`` 0 N M N N M N N N N N N O 0 U M N N 0 O CO 0 CO CO U) 7 7 CO N 0 0 Q) co - M c M M M M N N N N N N N N N N 0 00 C) > v (O (O 2 m Co CO D C 00 (0 (n CO 0 0 0 0 0 0 0 0 0 0 0 0 0 coOCO M O O O D A- 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 CL 47 0 M N N N N N N N N NN N N N N N N LL O` O� O r �- •- •-- r r r r r r r r r co N. N 7 (.‘i N C a N N J o (n N N F- 2 W a) O O 0 O 6) 6) N. N (0 N 0 co 7 co co 7 U .•• U) N CO CO CO CO 7 CO CD 0 CO V' CO CO CO C 0 N N N M M 7 U) U) U) (O r CO co 0 0 ,C U) to in U) co U) U) co U) tD U) U) U) 7 U) N A- a) C C A- O 0 0 0 00 N- (0 (0 LO 7 CO N N A- 0 0 0 U) U) tri tD tD tD tD tD U) tD U) U) U) a) 2 .y= U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) C CO CO CO (0 CO CD CO CO (0 CO CO CO CO (O CO CD CO a) o LU c ai ci m = =U m QC i U co CO N CO r CO U) 0 LO N Cr 0 CO 0 CO i w R r N- CO CO U) U) CO CO 7 tr) •7 CO CO 7 U) 0 t C) C) a• te41. d' >, co o) O O 60) 0 N N .- 0 Co7 N 0 -0 0 0 Q' L N d c 7 7 7 co 7 7 7 7 7 7 7 7 7 7 7 -1- 0- O- V 0 L+ .�. L (O (O (O (O (O CO co" (O (O (D (O CO (D (D (O (0 o D O CO C N. 0) N. N. N- CO N- rn N. N. N. N. rn rn N. M CD u, J F_ 2 Z (n a 0 Ui Ui Ui U) tri tri U; Ui Ui tri Ui Ui Ui Ui Ui tri W O) z F C Z C co 0 7 O co co 7 CO U) CO CO N CD CO O 7 0 U) U) N- U) 0 U) CO U) CO N co co 6) 0 O O N N N M tr) U) U) (O CO U) a (0 N. (0 CO CD N. N CO N. N N. N- N. CO N 7 Q1 ry N A- A- 0 0 6) CO N. r CO U) 7 CO CO N N V W U) U) U) U) 7 7 7 7 7 7 7 7 7 7 7 I — L O Q) L (o 0 Lc) o N- T CO 7 0 (D 0 7 -V l� 7 N U) CO CO O 0 N O M N N V. M O r 0 N. 7 (D N CO N- (O ,- U) co tD (O 0 M = CO N- N. N. CO CO 0 W 00 CO Cr) 0 0 0 0 6) W r N. N. n N- N. N. CO CO CO N- CO f- U) - M M M M M M M M M M M Ci M co M M a Z --- co m co U) U) co N 0 U) CO CO 0 N N CO N N- CO CD CO 7 7 N CO N CO 0 CO CO CO 0 0 CO 0 • N N CO 7 7 U) U) Co CO co CD 0 0 6) 6) co co co co) 0 0 0 CO CO co) 0 0 0 CD CO co co) 0 co) 0 co co) 0 co) CO (n 0 0 0 0 CO 0 CO CO CO CO 0 CD CD CO CD CO CO CD CO co- CD Co 0 6) 0 0 0 0 0 0 0 0 0 0 O) O) 0 • M U) U) CO CO U) U) U) U) U) CO O 0 O N M N 0 0 O N 7 N 0 0 O M N.- U) CO N. CO CO N U) (0 N. CO N. CO U) 1,- 1- N N N N N N N N N N N N N N N N CO C (n Q J 0 U) U) CO 0 CO 7 7 U) CO CO N N CO CO Q CO 7 7 7 7 7 U) U) U) U) U) U) CO CO CO CO O m m m 0 6 0 0 0 0 0 0 0 0 0 0 N CD Co Co co CO CO Co co CO Co co CO co Co CO co C.) >. C) Ln C o E C Q OC) O M t L m o 2 m N N coCQ O z a a ti Lt- o O o o 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O co N N M_ 7 7 CO CO CO r aD 0 0 N N C .. lU U) C�' r N- .- rCsi r l- N ,- O 0 W UL. mil - O) O m O) C pN O r d m R c) a (noa NN o • I/I. 110 h W a N 1�, a r ■ `_ 1 ■■■1 ■■ b 00 ■■ N - .1111111R g illii - LL I ■■■1; H NM _ ■I■ ■■■■1 n■ _ ■I■■■\■■■1 g m P0$ u�■ o■in■il ■ 1 ER A�HO Ii -- -■■■ _ I .,y,/ �. E ■■■ I � -■■�■ litg ��■■ ■■■■■ $ Ill lb ma r m 8$$� 1■■■"■'l■■■■■■■■ v 0 Q N 4J NO - - m` 4 ''� H ..� N LL r O O 0 LL E� 3w I R h C) J F Q V O N2: CSI M (111/U 0+7 U c ) '1ci1W`igIno en w� _ C4 W a I 9 3 N 0 ii :!. a i0, CZ H N N U 'IL" N o N 0 8 a 8 V < wm :: : :::::: Nm3m -a 4g vmi ofm m Ntt O hJ F all 0 el O.L LL LL` Z $.n 88888882', I ,Q `" CA Ho N Noioi of NN e.4/f rd.N . N .....7, .6.1 LL 'J� 3m ����" 88� 8 .o w o �S ` ?HlSQ m o o g Q w oWo 3a S�Smo 8 m m LL m m mmmmmm 2mm2mmmmm mmmm c P8i2 7.38-32,2 g :: : —.'1. .0!: e Il �� mVS� � X g . 8 38 " . Wv 2888$7.-,a 2888888 0 _ H o "o" o r o 0 00 1 H 0 o ��o� s � � m m A :ki, a N �a1 eas��W? �t_N�<�m�m� s�� � (u./U0g)uidaIie°:°A li 0 H X \1 W o m= w I I I 1 1 s if '..1- I 1 - � F P N 8 o 8bO6, a. I gsg. 5§�g AFF E . -_ . i iryr� .Q\tiJ W 8 81 \ \I =� s `%a ry ! a II N 1 1 to k+ pO N oa O 'n N o I I■ clscz' r__. H ' pm 1 '. _-_ ._ A'I ~�. Lei • 82 / W m p w- a v n , , 41 - . Y J N a N N 8006 co F4 \ a i+. h N m m 8 ea �� r t .* 20‘'1' .,n, CL a LL Q N LL ll I M ,"\\ o;113aO1 -. I I a 9. a-. m 31 d r 8i / 1 ✓1I 1• I 8 -p. 1 s3. .- .ii fj P. 1� 1 M R M 8 n R M $ N N 8 R e R P. 8 a o0 080 I — N N N N N 0 (uT/g SL)(+)14110 I/OtilnoSN 0 m a SAUCER ■ BPPASSPORT 0 HUGHES Travelling Cylinder Report bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-27-Slot 27 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: 28:27 10/13/1986 00:00 @ 67.90ft(generic drilling rig: Site Error: 0.00ft North Reference: True Reference Well: F-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore F-27B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 3 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB E Pad E-10-E-10B-E-10B 10,910.00 13,062.00 402.55 361.54 41.23 Pass-Major Risk E-29-E-29A-E-29A 11,115.41 13,728.00 1,025.22 278.68 746.52 Pass-Major Risk E-29-E-29A-Plan#2 11,100.00 13,600.51 1,075.44 277.55 797.90 Pass-Major Risk PB F Pad F-04-F-04-F-04 Out of range F-04-F-04A-F-04A Out of range F-04-F-04APB1 -F-04APB1 Out of range F-04-F-04B-F-04B Out of range F-04_DO NOT USE-F-04-F-04 Out of range F-04_DO NOT USE-F-04A-F-04A Out of range F-04_DO NOT USE-F-04APB1 -F-04APB1 Out of range F-04_DO NOT USE-Plan 3,F-04B-Plan 3 Out of range F-11 -Plan F-11C-Plan#6 F-11C 12,230.00 10,750.00 1,082.67 359.53 723.14 Pass-Major Risk F-18-deleted me Plan F-18A-Plan#7 F-18A Out of range F-18-F-18-F-18 Out of range F-18-F-18A-F-18A Out of range F-18_DIMS-F-18-F-18 Out of range F-18_DIMS-F-18A-F-18A Out of range F-19_DIMS-F-19-F-19 Out of range F-19_DIMS-F-19A-F-19A Out of range F-23-F-23-F-23 10,595.70 10,375.00 1,343.41 214.83 1,132.86 Pass-Major Risk F-23A-F-23A-F-23A 10,704.55 11,950.00 1,286.68 215.76 1,094.79 Pass-Major Risk F-27-F-27-F-27 10,573.70 10,575.00 9.40 14.18 -3.94 FAIL-Major Risk F-27-F-27A-F-27A 10,600.00 10,600.00 0.20 0.79 -0.56 FAIL-Major Risk F-27_DIMS-F-27-F-27 Out of range F-27_DIMS-F-27-F-27 Out of range F-28_DIMS-F-28-F-28 Out of range F-28_DIMS-F-28A-F-28A Out of range F-45_DIMS-F-45-F-45 Out of range F-45_DIMS-F-45A-F-45A Out of range F-45_DIMS-F-45B-F-45B Out of range F-45_DIMS-F-45BPB1 -F-45BPB1 Out of range F-46_DIMS-F-46-F-46 Out of range F-46_DIMS-F-46A-F-46A Out of range F-47-F-47A-F-47A Out of range F-47-F-47B-F-47B Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/28/2010 11:22:27AM Page 3 of 15 COMPASS 2003.16 Build 73 0 L 1 2 SII~ x d S� n MI IF w B 2 o Ig 5u.2 : 1 1111 N p ¢ o _ !- 1=1 U 401111 a ,IPi. III 11 II 1I �� P, R ^ 5 g III NIL \ U g. I C a II II 1 1 —111 lJ Qx a 0 c U v c C c i UH f Q __ U cci $ _ 8 I Q o & 3 cc _ I CI m 1 II11 : 1 SIIa. 0I,Eu,1 O I 1111111 11111 x 1 � I Z I u 5 Fmin 1111111 '�I I J J I my 5 Z U a Q 4i,, I '-' I. lir I qq1 i i .1 b". illA rl ��� •61•4s.r��4, i11 0! �3 . 0 ✓ I �a X11 • p 0 4 44 c :11 t F� ■ • —11 _6�' IQ o H 2 cc lo i O 41. w 1 Oil t ♦ I ul U M. 1 Cf r i 41014 Qy ' N , v U Q ✓ 1ir - I In m I T I I Li ►1 cc i M_I w y T. unr. 0 ii 1im �� I1 14Ii' ' II I 11111 I. r_ii II I ndn v., III1m11 I iii,, nm o 0 41 t . '7_ a- .. li 111111 cr, I'Ill ~ O .— — i 11 =11'111' a Alaska Department of Natural D esources Land Administration System Page 1 off Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources (Alaska DNR Case Summary File Type: ADL File Number: 28280 Printable Case File Summary See Township,Range, Section and Acreage? O Yes Q No New Search LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28280 �'�aP._- Search for Status Plat Updates As of 11/04/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E. BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated: 05/28/1965 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 11 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 12 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-91 T11N, R13E, UM 1, 2, 11, 12 2,560.00 07-07-1987 ***LISBURNE PARTICIPATING AREA DESCRIPTION*** T. 11 N., R.13 E., U.M. SECTION 1:ALL 640 ACRES SECTION 12:ALL 640 ACRES http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2828... 11/4/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME , i4""v277,3 PTD# ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: eV/. •Z.1/ POOL: ?,F'!/,G�/, i ee-2 9/ /G Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 Ts w 0) O CD 0- w U N_ a) 6 o (6 l) — 7 15 E Q C 0 a) 0 > _C N Li] CO CI O a D C -C E E 0 o 0) @ C a CD E a O o a` 00 U) a) -C o E) 3 1.0 cu C = O (p O fn -0 .0 a) — -a2-. 7 V M @ o ' @ a V O >@ a > LL k a o 2 = • a w a v LL� ' 0 C Q 0 3 F- > (p o M @ O z Q N N m O E DQ a O U 6 @ a r @ z 0 O a m INi n 0 a .a m O (0 a) W C N a C cei CV CV 13 LL N E O co 0 a) N OO C O W co =>>> 0 @00 Q LL @ ICN r D 0 m 77L- a CO co N@ IX (O LL a) O) a co N - O) LL @ C N 0 C - 't/7 U d .CC 0 m C C CC C a CC a c 0 -a U O N o O @ N N C V) N 'y U _ N N C co 2 O @ @ C -0 @ Ur coO 0 0 O a) N T "OE N LL co CO I I Z a) 7 U U U o @ r E 0 �O LL O a) "0 @ @ 13 N L co 'X L j Z' CO O 7 7 E. 2 01 O O >>N a Q co N m w CO O CO V)' W, 0 12 M 0_ 5. 2 2 2 2 d W a < a) co a) a) a) a) co a) a) a) a) a) < < < < < < < < o a) a) aa)) a) < a) a) a) a) a) a) < o < < < < Q a z >- > >- >- >- >- >- >->- >- >- >- z z z Z z Z z Z Z >- >- >- >- z >- >- >- >- >- z z z z z Z T F0• O N 0 N U E E C CL�. T O 4 C t O (n it o c = >-. 0 o `a) m E CD0 (gyp O N co -c.o.' U T U C C 0 O O 0 -0 > E uUi o w coO @ O O N N a @ O O U) a 2 7 E c c J 7 cva) a _0 -o 0Q Hd cav) u-2 -oa.) 0 m u00 °�' am 7 n >C > .-. •Nc. c O V) a CN @ c > N a)ma t ao o a ng o m_ 0, U 0 @ 7 ?i a) oO usC0) -C c 0 7 - .O Lo CO "5 O N N N a) 01 W -o O C' -O O a) -C- -9 @. a) d • D O i. 0 m O O co a) LL L C N C a) (n in CCS > > -o a E o c o, CO-` cm o O QT E E a c c E @ o M c c n F- c E ot3 w �_ c a) w m a N t a c c Y o o `0 7 0 o c cn 3 0 @ a U c o 0 o T - o CI cn a� 4- 4- 0 -o U@ E u, o o Q ° a) �' 7 U a o 0 0 n a 3 E > @ Y o N 2 O a) a) C C O O C O �O @ @ C Q (6 @ 0 a o O a) m �j Q E n o o@ m Y o o m m a > o m c . 1., cc U U 0 S) o o 0 c a.) — Z o E 7 3 a) E .) -C m 3 _ o LL Q 2 7 c 0 .o m@ o 'C. w a@ `@ 7 a -o m •6 a a) a) m ._ a) o) a u) a a 3 O o `" 3 c E TD z 0 c c N v, m a a@ •3 •3 ao) N @ 0 s_ -0o a, .� _ 3 m m o a 0 U L_ 0. a) o w o 3 ac) O cu o w o d O 0 -C C :D � N N .p, -0 -0 > '> U O 7 V a) o N N O. a O a C -0 o C U -O CO N 13 @ o -s-. o 0 a) E @ E O CO o a) O O , 0 o 0 N D E m @ E L o a) a 7 C otf Q -c a a)o. D a s a) - a) O. N N a C V a) U a E a) .@-1 — -O a) N -O T. E O 0 p }. 7 C :8, o -0 t. U @ E a) O O 0) - — a N 0 @ .- 'C y o) a @ @ co @ W @ `o 2 p) T C U .3 = N p CO L T.) O a m c a a 0 N @ .0 0 a) S -0 a) I c 70• o. `a) c Y m = D E % 0 3 0 a) a) >, " a) iL m a — 0 0 o U c m a a a m N '� a) m > o) @ a a) m ° U) o U a c@ ❑- a) a) a) co - o r c c - a) 0 C @ -o -o o 'N = 3 a 0 co .c o °) m C a) C c E. x 0 E a) @ m io ami @ @ E m 3 7 a) o U a) @ U a) a) = a) 7 -o 0 @ c o @ w c U U U o o U a) U m o c v a) o o _ ° @ o@ ai a Er.-. o c 0 a`�i c O 7 U > > 3 0) 7 7 07 0 3 N @ :C a a) U J CO .E N cr o 0 0 a) 0 0 E E 0 3 a c a F- F- F- - ami `) aa)) m = a d o m 0 E �° w a c is T a _I D 5 5 5 (7n a O O Ci)- a 0 Q a`. z° O (n Lt 0 0 0 ra 0 a a a 0 m m 0 N M a o in in 0 rD U c a I0 N CO (CCO r CO 0) O — N M V (O (O r CO OO N N N) V (N N rN eNO N) O) •;-) M A UM) (D Mr MW CO)V I U O O O 0O N O a) O a) O C N N RS N U C 0 0 V 0 0 V 0)V) W O A — =O N Ct. o a) E N i) a) T 0 E JW o £ a U C Q cn a cn U PO CL < Q Q w O 0 Q Q %Nell History File APPEND' X Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 11/03/09 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 10/12/27 3556257 01 2.375" CTK *** LIS COMMENT RECORD *** 1111111111111111111 Remark File Version 1.000 1111111111111111111 Extract File: ldwg.las -Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 9695. 5000: Starting Depth STOP.FT 12227.0000: Ending Depth STEP.FT 0. 5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: F-27B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 20' 7.395"N 148 deg 45' 41.404"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 2.375" CTK DATE. LOG DATE: 27 Dec 2010 API . API NUMBER: 500292165902 -Parameter Information Block #MNEM.UNIT Value Description SECT. 02 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . DF Log Measured from FAPD.F 67.90 Feet Above Perm. Datum DMF . DF Drilling Measured From EKB .F 67.90 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 910 —1( 1 Obt19 tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by well Schlumberger GR CNL above the kick off point of 10571 feet MD dated 01 Sep 2005 per Walter Tifental with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from F-27A through a milled window in a 3 3/16 inch liner. Top of window 10572 ft.MD (8985.7 ft.TVDSS) Bottom of window 10577 ft.MD (8986.3 ft.TVDSS) (9) Tied to F-27A at 10571 feet MD (8985.6 feet TVDSS) . (10) The interval from 12204 ft to 12227 ft MD (8977.1 ft. to 8977.8 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 9703.89, 9701.22, ! -2.66797 9707.79, 9703.89, ! -3.90039 9712.31, 9708.82, ! -3.49023 9714.77, 9713.33, ! -1.4375 9716.82, 9716.21, ! -0.615234 9718.88, 9719.29, ! 0.411133 9722.37, 9721.96, ! -0.410156 9728.93, 9728.32, ! -0.615234 9733.45, 9732.83, ! -0.615234 9737.14, 9736. 53, ! -0.615234 9746.38, 9746.59, ! 0.206055 9754.18, 9753.56, ! -0.615234 9755.82, 9756.44, ! 0.615234 9761.16, 9761. 57, ! 0.411133 9766.82, 9767.44, ! 0.616211 9777.91, 9776.06, ! -1.84668 9782.63, 9783.24, ! 0.616211 9787.76, 9787.76, ! 0 9791.66, 9792.69, ! 1.02637 9802. 54, 9800.9, ! -1.64258 9803.97, 9802.33, ! -1.6416 9808.7, 9806.44, ! -2.25781 9811. 57, 9810.34, ! -1.23145 9813.21, 9812.18, ! -1.02637 9815.47, 9813.83, ! -1.6416 9819. 57, 9818.14, ! -1.4375 9822.37, 9822.98, ! 0.616211 9827.09, 9827.09, . 0 9831.6, 9830.78, ! -0.820312 Page 2 tapescan.txt 9834.07, 9833.04, ! -1.02637 9838.99, 9836.94, ! -2.05273 9840.43, 9838.79, ! -1.6416 9842.28, 9840.43, ! -1.84766 9850.49, 9848.43, ! -2.05273 9855.41, 9854.18, ! -1.23145 9860.34, 9859. 52, ! -0.821289 9862.18, 9861.16, ! -1.02637 9864.24, 9862.8, ! -1.43652 9867.11, 9866.08, ! -1.02637 9872.04, 9871.22, ! -0.821289 9873.06, 9873.68, ! 0.615234 10566.7, 10566.1, ! -0.616211 10570.8, 10569.8, . -1.02637 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 113 records. . . Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** 111111111111111 1111 Remark File Version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL above the Kick 0 of 10571 feet MD dated 01 Sep 2005 per Walter Tifental with BP Exploration (Alas * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Page 3 tapescan.txt Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 61 Tape File Start Depth = 9695. 500000 Tape File End Depth = 12226.000000 Tape File Level Spacing = 0. 500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 70 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** IIIIII11 ! 1IIIIliiiI Remark File Version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 Page 4 tapescan.txt 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 121 Tape File Start Depth = 9697.750000 Tape File End Depth = 12227.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet **** FILE TRAILER **** Tape Subfile: 3 130 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes **** TAPE TRAILER **** MWD 10/12/27 3556257 01 **** REEL TRAILER **** MWD 11/03/09 BHI 01 Tape Subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 9695.5000 37.2000 -999.2500 9696.0000 37.9851 -999.2500 12226.0000 -999.2500 159.5000 Tape File Start Depth = 9695.500000 Page 5 0 tapescan.txt Tape File End Depth = 12226.000000 Tape File Level Spacing = 0. 500000 Tape File Depth Units = feet 0 Tape subfile 3 is type: LIS DEPTH GR ROP 9697.7500 -999.2500 -999.2500 9698.0000 37.2000 -999.2500 12227.0000 -999.2500 159.5000 Tape File Start Depth = 9697.750000 Tape File End Depth = 12227.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet 0 Tape subfile 4 is type: LIS Page 6 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format.