Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
176-082
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Injector 09-10 (PTD #176082) Lapse on 2 year required MIT-IA Date:Monday, May 19, 2025 7:37:45 AM From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Sunday, May 18, 2025 11:31 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com> Subject: NOT OPERABLE: Injector 09-10 (PTD #176082) Lapse on 2 year required MIT-IA Mr. Wallace, Injector 09-10 (PTD #176082) operates under AA AIO 4E.025 for slow IAxOA pressure communication. The well is due for 24 month AOGCC witnessed MIT-IA this month and will not be on injection. At this time, the well is classified as NOT OPERABLE and will remain shut in. An AOGCC MIT-IA will be required when injection is restarted. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, July 25, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 09-10 PRUDHOE BAY UNIT 09-10 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/25/2023 09-10 50-029-20235-00-00 176-082-0 W SPT 8331 1760820 2460 1658 1660 1659 1658 298 444 477 501 REQVAR P Bob Noble 5/10/2023 2 year MIT-IA 10 1.2 x max injection pressure as per AA AI0 4E.025 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 09-10 Inspection Date: Tubing OA Packer Depth 303 2751 2716 2704IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN230511162151 BBL Pumped:4.3 BBL Returned:4.5 Tuesday, July 25, 2023 Page 1 of 1 9 9 9 9 9 9 9 9 9 9 9 9 9 92 year MIT-IA James B. Regg Digitally signed by James B. Regg Date: 2023.07.25 11:01:00 -08'00' Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/18/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU 09-10 (PTD 176-082) Injection Profile 09/04/2021 Please include current contact information if different from above. 37' (6HW Received By: d 10/20/2021 By Abby Bell at 2:35 pm, Oct 20, 2021 Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/06/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU 09-10 (PTD 176-082) Injection Profile 09/04/2021 Please include current contact information if different from above. Received By: 10/06/2021 37' (6HW By Abby Bell at 3:45 pm, Oct 06, 2021 MEMORANDUM State of Alaska Permit Number: 176-082-0 Alaska Oil and Gas Conservation Commission TO: Jim Regg rDATE: 51t zzi Tuesday, May 11, 2021 P.I. Supervisor SUBJECT: Mechanical Integrity Tests 111 Hilcorp North Slope, LLC Well 09-10 FROM: Lou Laubenstein PRUDHOE BAY UNIT 09-10 Petroleum Inspector 8331 - Tubing Src: Inspector 1598 Reviewed By: P.I. SupryJ� NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-10 API Well Number 50-029-20235-00-00 Inspector Name: Lou Laubenstein Permit Number: 176-082-0 Inspection Date: 5/32021 i In3p Num. mitLOL210503171846 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-10 Type Inj w • TVD 8331 - Tubing 1600 - 1598 1598 1598 PTD 1760820 • Type Test sPT Test psi 2114 ' IA 649 2294 2261 2249 BBL Pumped: 3 BBL Returned: 3 OA 488 622. 631 - 652 Interval REQVAR P/F P Notes: MIT -IA to 1.2 x the maximum anticipated injection pressure of 1820 psi, per AA AIO 413.025. ✓ Tuesday, May 11, 2021 Page I of I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO:Jim Regg o' Supervisor �J �ll�I IP.I. DATE: Friday, May 31, 2019 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC. 09-10 FROM: Jeff Jones PRUDHOE BAY UNIT 09-10 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Supry _)D� NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-10 API Well Number 50-029-20235-00-00 Inspector Name: Jeff Jones Permit Number: 176-082-0 Inspection Date: 5/12/2019 Insp Num: mitU190531100259 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 0910 Type Inj W -,TVD 8331 Tubing toss - Oso 4491 1,12 PTD, 1760820 !Type Test SPT Test psi 2083 IA 517 2500 2488 - 3184 BBL Pumped: 35 BBL Returned: 34 OA 1 202 863 sal 90 Interval REQVAR P/F P Notes: AA 4E 025 2 year MIT -IA to 1.2 X max. injection pressure. 1 well inspected, no exceptions noted. Friday, May 31, 2019 Page I of I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMP REPORT OF SUNDRY WELL OPERA' " 1V AUG 0 8 2018 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operation ut C ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Pluq for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ❑ Stratigraphic ❑ Exploratory ❑ Service 0 5. Permit to Drill Number: 176-082 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 6. API Number: 50-029-20235-00-00 7. Property Designation (Lease Number): ADL 028345 8. Well Name and Number: PBU 09-10 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12715 feet Plugs measured 12565 feet true vertical 9077 feet Junk measured 12565 feet Effective Depth: measured 12565 feet Packer measured 11476 feet true vertical 8978 feet Packer true vertical 8330 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 36-116 36-116 1530 520 Surface 2694 13-3/8" 34-2728 34-2728 4930 2670 Intermediate 12048 9-5/8" 32-12080 32-8671 6870/8150 4760/5080 Production Liner 951 7" 11759 - 12710 8486-9074 8160 7020 Perforation Depth: Measured depth: 12377 - 12562 feet True vertical depth: 8855-8976 feet SCANNED SEP Z b M3 Tubing (size, grade, measured and true vertical depth) 5-1/2" 17# x 4-1/2" 12.6# L-80 / N-80 30-11604 30-8400 Packers and SSSV (type, measured and 5-1/2" Baker SAB Packer 11476 8330 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 12569 760 1344 Subsequent to operation: Not yet online 10 1344 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations 121 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG 0 GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Bernhard Stechauner Contact Name: Bernhard Stechauner Authorized Title: Production E eer Contact Email: Bernhard. Stechauner((Dbp.com Authorized Signature: Date: Contact Phone: +1 907 564 4594 - Form 10-404 Revised 04/2017 ►r , �^ a D BDM UG 0 9 2018 V Submit Original Only ��' C r J Daily Report of Well Operations PBU 09-10 ACTIVITYDATE SUMMARY 7/17/2018 ****WELL INJECTING UPON ARRIVAL**** (Perforating) DRIFTED W/ 20'x 3.70" DUMMY WHIPSTOCK, TEL TO TD @ 12,518' SLM / 12,528' ELMD (Sticky btm, No issues) ****WELL LEFT S/I & DSO NOTIFIED OF STATUS UPON DEPARTURE**** 7/25/2018 *** WELL ON INJECTION ON ARRIVAL *** (SLB E -LINE AD PERFS) INITIAL T/1/0: 1400/750/450 RIG UP, PT TO 3600 PSI *** JOB CONTINUED ON 26 -JULY -2018 *** 7/26/2018 *** JOB CONTINUED FROM 25 -JULY -2018 *** RUN 1: PERFORATE 12408'- 12426'W/ 3406 POWERJET, 6 SPF, 60 DEF PHASED. CCL TO TS = 9.8', CCL STOP DEPTH = 12398.2' RUN 2: PERFORATE 12377'- 12400'W/ 3406 POWERJET, 6 SPF, 60 DEG PHASED. CCL TO TS = 15.75', CCL STOP DEPTH = 12361.25'. RDMO. NOTIFY PAD OP ON DEPARTURE AND HAND OVER RAP. TROUBLE WITH SSV CLOSING. GREASE CREW TO COME OUT AND TROUBLESHOOT. WELL SHUT IN ON DEPARTURE. FINAL T/I/O = 35/20/0. ***JOB COMPLETE ON 26 -JULY -2018*** TRIS = FMC VVH_L.IfAD= FMC ACTLV�TOR- AX8_SON 04CB. ELEV ❑TATE 3-3/8' 6 KOP 3035' �; i16x Angle = 58` 0 5944', Datum MD = 12376" OatumTVp` 8800' SS. • 13-3/8" CSG, 72#, N-80, D =12.347' 2726' Minimum ID = 3.726" @ 11640' 4-112" OTIS XN NIPPLE 5-1/2" TBG -NPC, 17#, N-80, —( 11486- .0232 bpf, D = 4.892" TOP OF 4-1/2- M NPC 11486' 4-112- TBGNPC, 12.6#, N-80, — 11601- -0 152 1601'0152 bpf, D = 3.958' TOP OF 7" LNR- 9-5!$' CSG47#, MN -80/S00-95, 10 = 8.681" 12076' PERFORATIDV SUMMARY RIB= LOG: CNL on 3/1111977 ANGLE AT TOP PERF: 49^ @ 12444' Note: Refer to Production DB for historical perf data SIZE SPF WERVAL Opn/Sgz ❑TATE 3-3/8' 6 12377-12400 O 07/26/18 3-318' 6 12408-12426 O 07/26/18 BP Exploration (Alaska) 05422117 1 BTNJ ADPERFS (05/19117) 12377-12397 S 11/17/87 12408-12423 S 11/17/87 3-3/8' 6 12444-12464 O 05/19/17 3-318' 4 12447-12450 O 11/05/89 3-3/8' 4 12455-12460 O 11/05/89 3-3/8" 12477-12486 S 11/17/87 3-318" 6 12490-12492 O 04/09/96 3-318" 6 12492-12500 O 04/09/96 3-3/8" 6 12500-12502 O 04/09/96 3-38" 6 12502-12505 O 04/09/96 3-31W 6 12505-12520 O 04/09/96 3-3/8' 6 12520-12522 O 04/09/96 3-3/8" 6 12522-12526 O 05/23/96 3-38" 6 12526-12535 O 05/23/96 3-3/8' 6 12535-12542 O 05/23/96 2-111" 3 12542-12549 O 06/05/88 2-1/2" 3 12549-12562 O 06/05/88 7- LW 29#, N-80, .0371 bpf, D = 6.184" 12708' �� 12715' NOTES: H2S 4FON M1. WELL REQUIRESS A sSSV WHEN GE 125 ON 09-10 Mt. 11380'- TIGHT SPOT 2� 15-1/2' OTs Rom sssv W, D = 4.562" 11$38' �15-1/2' OTIS XA SLDNG SLV 11415' 5-112" OTIS XPi NIP, D = 4.455' 11431` 5-1/2' BOT PBR ASSY 11478' 9-5/8- X 5-1/2^ BAKER SAB PKR 11486' S-1/2" X 4-112" Xo 11640' 4-1 /2' QTiS XN NP, D = 3.725" 11598' 4-112' BOT HQE 11601' 4-1/2" TUBING TAIL 11565' ELM TUBING TAIL - LOGO 3/11/77 11759' 7" LNB2 PATCH TOP 12565` CTM f FISH - T X 2-1/2' GO -DEVIL WIRE CUTTER (11/20/87) 12666' CMT (TAGS CTM 11117/87) PRJDHOE BAY UNIT VVELL- '09-10 PEFW No: '1760820 API Flo: '50-029-2D235-00 SEC1, T10N, R15F- 1580' FSL & 26 FVVL DATE REV BY OOMMENTS DATE REV BY CORNA30S 03111/77 ORr"L COMPLETION 07/30/18 J ADPERFS (07/26/18) 03/21/01 RN/TP CORRECTIONS 08/06/18 BS/JMD CORRF-CTID FTSH LOCATIC)N & DATES 02/11/11 MB/JMD ADDED SSSV SAFETY NOTE 01/10/12 TMNM ADDED 1-12S SAFETY NOTE 04/13/161 JMD W3S CLEANUP PER TALLES BP Exploration (Alaska) 05422117 1 BTNJ ADPERFS (05/19117) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISIN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well ❑ Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 176-082 3. Address: P.O.Box 196612 Anchorage, Development ❑ Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20235-00-00 7. Property Designation(Lease Number): ADL 0028345 8. Well Name and Number: PBU 09-10 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12715 feet Plugs measured 12565 feet E I E true vertical 9077 feet Junk measured 12550 feet JUN 2017 Effective Depth: measured 12565 feet Packer measured 11476 feet ! N 2 1 true vertical 8978 feet Packer true vertical 8330 feet AOG CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#1-1-40 36-116 36-116 1530 520 Surface 2697 13-3/8"72#N-80 29-2726 29-2726 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner 951 7"29#MN-80 11759-12710 8486-9074 8160 7020 Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 5-1/2"Baker SAB Packer 11476 8330 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED JUL 2 5 2017, Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: -4984 429 1347 Subsequent to operation: -5089 429 1349 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR o WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stechauner,Bernhard Contact Name: Stechauner,Bernhard Authorized Title: F Lea Contact Email: Bernhard.Stechauner@bp.com Authorized Signature: - Date: G/Z vi--/- Contact Phone: +1 907 564 4594 Form 10-404 Revised 04/2017 1/1-1-. 1L 71t1 1 -- i 7/,RBDMS \ Ju,i L 13 2017 Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED JUN 21 2017 RE: BP Exploration (Alaska), Inc. AOGCC Report of Sundry Well Operations Summary June 21, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Adding of Perforations for Well 09-10, PTD # 176-082. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 S • 0) • 0• 0 00 0 0 0 0 N N- O co 00 NCO O O ti O O N L) O Ln N LO co 0 yo 0 0 0 0 0 0 0 L M M I- N- It) CO d' CO • 0) CO 00 M t r N W (.fl (O CO CO CO (O r M 0 O N O t I- ti CO O N- V CO O M �t N N CO CO O) CO CO • I- CO 0) CO CO CO 01 N O CO O M CO N CO CO CO N 00 00 CO • G) OCO (O0) 00OCNOO N O r- d' CO N N N N ✓ p IIIIIIII ocErco O O N CO O N O 'Cr in O CO N CO co c N r r r • CL O co aO O OO � 00 o rtZZZOOc0 JZ (# Z *k ,N N N • O • CI) O pp _ V V U O CO N NMmi � Ln1 o) 'Cr 135 0 0) N LC) M C 00 CO CO M Ln N N N N 00 CA O) " J W W W • HHH < <t < 010 • O uJ w w 'N U 222 ZZUo Z c W WWWE O D1 - I— HZDD U w Z Z Z J H 1_ II • a) U, Ca m Ln M V m ao co O) N M _ N O) M V N- r Cfl L.n 0) CO CO M Ln in V O) in r V M (NLn O CO N N- p_ r.: V O NO Ln C7o Ln d1 Ln co m m O N oo N N. Ln w co CO O O O O N- N N M C) M V V In In CO CO N- o o0 0o O) O O) 6) O) O) O) O) O) O) O) O) O7 O) O) O) O) O Cao Co aD Co Co 00 0o in co ao Leo 0o Cao Co Co 0o Cao Co > 1- a a O F' co CO N- V M CO CD N IC) CO — N O) CO V N- N- CO Ln .0 CO CO CO CO . in CO O In CO V co CN in — 0 CO N a V V Oo O N 6 in O cd O Ln O co (xi O N c0 N N- 0 a) Ln N- O) O O O O N N N M m m V V Ln Ln Cfl co w O co co 0o O) m O O) O) O) O) 0) O) O) O7 O) O) O) 0) O) > O co Co 00 co co in co ao ao Cao Co co i 0o in in Oo Co 0 > 2 L- w cc 0 00 w z W w0 w o W Q J O Y O >O m O O W Y Y H ,C N- M N- O Ln O V M N O N Ln O N O Ln N CAN _ _ J U U W w W O N V Ln to CO Co Co O) O O O N CV N CO V Cr O J J J Q Q zNNNN J D DC 8NN NNNNNNNNNNNNN UU < W W CN ZZ Z ' wa Z ZZ .0 2 0• 0 I O 11.1 LU V p 22 2 O 0) 0) (1) u) cno M x— Q °' 0. 012 C .0r M V N- O Ln O N- O N O N Ln O N CO Ln N O) a N- O V et Ln Lf) CO N- O) O) O O O N N N M V V O MM , M V V V V V V V V V Ln Ln Ln Ln Ln Ln Ln LU Ln O N N N N N N N N N N N N N N N N N N N ( a@ L a) O 2 cCwcr Y = 00 u) L 2 O 0) 0) cow Ln O 0- y O 0 c 2 N N LL LL LL LL LL_ N LL_ LL_ Lt_ Lt_ LL_ LL. LL LL I. LL LL a 0 a, o a a H r, D MM ' ' ' M M M M M M 0) MMM rn rn COM O > > O O r 00000 M M M W J _1 Z O N N N N N O O Z '"- 1 1 Q JJ W - 1"-- r-- 6) 6) N- - - (\� C 7 M -. O W N N w O W JJ O JJ J JJ O w , d = .- - - . - - � , , V V N NNma) Z Lln Jn 0 JJ W W w W a �, Ln Ln LO Ln Ln in in Ln < 121 J F- J J D J 3 cr a o m DYnY W -L JOQ a w w < < T) a11Ln U u. 7) LL Ln a cc m E Z• o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 >, - N- .- = = = = = = = = = = ,- 6) 6) 0) 0) 0) CP O) O) 0) O) O) O) O) 111111 O) O) O) O) O) O) m d d 0_ 0 _1 0 0 W a O 0 0 0 O O O O O O O O O O o O O O O < Q m m LL LL U) V) a 0 • • iii » 0LU tti \ /) O I I / \ 2 2 'a I F- LU 2 § E R �E i = 2 < '� rll k � < Se E co q * / 0 0 iN \ -6 / / _0 - e R e = u > ƒ ) c > S \ w = � z ƒ : - > I 0 z � f\ / / 7 � G / f § e= \ > & \ » � fg / � \ / �� o R gm / ƒ /N _ / 5 = 0 o co _ _ ± I co 0 > CL� / u = 0) 1- ƒ co / / � / s- k / 4 \f \ / \ \ 0 2 / / / / 0 E q ° E ° < E,a e o -1-. . z R R II R O a / ƒ S § / CO _\- E CL / :: i 0 - \ O A % Cr) -/ t / / / \ / \ R \ / \ \ 3 o o t x G 0 \ ) .7$ 0 2 co / < 'f' D : \ § / \ / 0 % \ L „. �� - / _ . » 3 CO 2 t ® + < ® e U_ o < \ o = °- t o � > / � ƒ G / 22- - $ 0) / \ o Lij CL ƒ / \ / b P. / / / \ \ h / \ / Ce < ± » ' ± ° l » u) E 0 < < 2 < >I 2 a o 7 � - Z E \ t E/ 11 Z 6 \ -J � ƒ . O / E CO 2 := 0 (Dili= L- > 01-40j & W - as o E O o ,_ N a 2 0 6 2 ± E Lj t CI C\I Z 7- t / / $ / \2 \ / > z \ I / / R / / U7c cpU & § / % \ / " H O2 \ ± o m ± L 2 2 w w g ± 792 ± R - E / / / \ / k / / � / / \ / " \ 0D0 __I- ® o / k ® \ co \ § 2 \ \ / 0 \ @ ƒ co L u_ E 0 g L 2 f e ] ƒ \ [ \ L _< ± % R \ ? \ E e / PE * o P $ - > > f - I E \ 0 ° : O w : : c : 6 i a± 6 o g : \ E I _ : E L < » » N- » » \ d \ d \ / o & ,_ n e 1-- ...7 « c \ \ \ \ \ < TREE='' FMC • SA NOTES: H2S READINGS AVERAGE 125 ppm W LLi-EAD= FMC WHEN ON MI,WELL REQUIRES A SSSV WHEN ON ACTUATOR= AXELSON 09-1 0 MI. 11380'-TIGHT SPOT OKB.ELEV= 54' — BF.ELEV= ? KOP= 3035' Max Angle= 58°@ 5944' ® 2190' _15-112"OTIS ROM SSSV NP,D=4.562" Datum MD= 12376' Datum ND= 8800'SS 13-3/8"CSG,72#,N-80,D=12.34r 1-1 2726' Minimum ID =3.726" c 11540' 4-112" OTIS XN NIPPLE I I 1 I 11338' H5-1/2"OTIS XA SLDNG SLV 11419' 1—5-1/2"OTIS XN NP D=4.455" j LJ 11431' H5-1/2"BOT PBR ASSY 5-1/2"TBG-NPC,17#,N-80, - 11486' g X 11478' —9-5/8"X 5-1/2"BAKER SAB PKR .0232 bpf,ID=4.892" / I 11486' H5-1/2"x 4-1/2"XO-1 TOP OF 4-112"TBG-NPC -- 11486' I I 11540' H4-1/2"OTIS XN NP,D=3.725" , 1159 ' —14-1/2"BOT MULES 4-1/2"TBG-NFC, 12.6#,N-80, --I11601' — .0152 bpf,D=3.958" / 11601' H4-1/2"TUBING TALE TOP OF 7"LNR — 11759' I 11565' — TUBING TUBG TA LOGGED 3/11/77 I 11759' -7 LINER PATCH TOP 1 9-5/8*CSG 47#,MN-80/S0O-95,ID=8.681" H 12076' I , PERFORATION SLM4A RY REF LOG:CNL on 3/11/1977 ANGLE AT TOP PERF:49"@ 12444' Note:Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sqz DATE 12377-12397 S ' 11/17/87 ' 12408-12423 S ' 11/17/87 3-3/8' 6 12444-12464 0 05/19/17 I 3-3/8' 4 12447-12450 O r 11/05/89 3-3/8' 4 12455-12460 O r 11/05/89 3-3/8" 12477-12486 S r 11/17/87 3-3/8" 6 12490-12492 0 04/09/96 ' 3-3/8" 6 12492-12500 0 04/09/96 3-3/8" 6 12500-12502 0 04/09/96 3-3/8" 6 12502-12505 0 04/09/96 I 3-3/8" 6 12505-12520 0 04/09/96 3-3/8" 6 12520-12522 0 04/09/96 ' 3-3/8" 6 12522-12526 0 05/23/96 3-3/8" 6 12526-12535 0 05/23/96 12565' —1CMT(TAGGED CTM 11/23/87) 3-3/8" 6 12535-12542 0 05/23/96 1111111111111111 2-1/2" 3 12542-12549 0 06/05/88 1111111111111111 2-1/2" 3 12549-12562 0 06/05/88 1111111/11�111./ 111111!111111111 11111111 7"LNR,29#,N-80,.0371 bpf,D 11.•-• X111 =6.184" H 12708' X111 /11-x-1111/ 1111`1.1• �; t 12550' H-FISH-3'X 2-1/2"GO-DEV L WIRE CUTTER I TD —) 12715' 1.0.0.4.07. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/11/77 ORIGINAL COMR.ETK?N WELL: '09-10 03/21/01 RN'TP CORRECTIONS PERMIT No: '1760820 02/11/11 MB/JMD ADDED SSSV SAFETY NOTE AR No: '50-029-20235-00 01/10/12 TMNJMD ADDED H2S SAFE!Y NOTE SEC1,'PION,R15E, 1580'FSL 8 25 PM_ 04/13/16 JMD WBS CLEANUP PEER TALLES 05/22/17 BT1VJM5 ADPERFS(05/19/17) BP Exploration(Alaska) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,May 17,2017 TO: Jim Regg 5 P.I.Supervisor -QLl (-(1 SUBJECT: Mechanical IntegritY Tests BP EXPLORATION(ALASKA)INC. 09-10 FROM: Matt Herrera PRUDHOE BAY UNIT 09-10 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry J.P '- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-10 API Well Number 50-029-20235-00-00 Inspector Name: Matt Herrera Permit Number: 176-082-0 Inspection Date: 5/16/2017 Insp Num: mitMFH170516171104 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-1) Type Inj W' TVD 8331 ' Tubingj 1336 1333 1339 ' 1335 - p PTD 1760820 Type Test SPT Test psi 2083 IA 477 2340 _ 2329 - 2325 - BBL Pumped: 3.8 BBL Returned: 3.8 ` OA 478 537 . 575 . 609 - Interval f REQVAR P/F P vi( Notes: AIO 4E.025 2340 PSI IA Pressure test per Operator SCANNED ) Wednesday,May 17,2017 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg I 1 Z1I�� DATE: Tuesday,May 12,2015 P.I.Supervisor ` SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 09-10 FROM: Lou Grimaldi PRUDHOE BAY UNIT 09-10 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry 339— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-10 API Well Number 50-029-20235-00-00 Inspector Name: Lou Grimaldi Permit Number: 176-082-0 Inspection Date: 5/7/2015 Insp Num: mitLG150507194804 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-10 " TT Inj T W TVD 8331 Tubing 1335 1335 • 1329- 1324 PTD; 1760820 '1Type Test SPT'Test psi 2083 IA 322 2501 ' 2493 ' 2491 - Interval REQVAR iP/F P '' OA 63 , 70 - 73. 77 Notes: 4 bbl's diesel pumped and returned.Good solid test of IA.All pertinent documentation supplied prior to test. Mt : - T.7-6 fe sc p tt)- - CA:vf- d—tOek Sc.1e t 4C-- KAN$IW MAY 2 2 2015 Tuesday,May 12,2015 Page 1 of 1 • • ,••.1,00 B ..,_.,. 1 2 ++ 4 + 1 I to, i (..) ....s, , . 1 • .., • • _...... • air 1 a no I ,•P • no ..• i ..3.._ .. .. :•i . . . . -... _ • . . •: ,... . . . . .. . ... • -..-, . :.. . . .• • • .. :,...; a • . r • • :-:: a a • • • -.1, • :r;l. .. I • a • • . • 4 . t•-• - ..-. . - . . .• • [ • • ... -. • • ... • • ... .... ; J • • II • . II , • t, , • 4 I .. ! . ii • f I .• / • 1 , • 1 I • t.-' i 1 • .' . t . 1 . . . . . . . 1 ; • • I • 1 WELLHEAD= FMC S Y NOTES: H2S READINGS AVERAGE 125 ppm ACTUATOR= AXELSON W,,,.,4 ON MI. WELL REQUIRES A SSSV WHEN ON KB ELEV= 54' 09-10 ML 11380'-TIGHT SPOT BF. ELEV= ? KOP= 3035' Max Angle= 58°@ 5944' Datum MD= 12376' Datum TVD= 8800'SS 1—"E' 2190' _15-1/2"OTIS ROM SSSV NIP,ID=4 562" [ rr 13-318"CSG,72#,N-80, ID-12.347' 2726' Minimum ID = 3.725" @ 11540' 4-1/2" OTIS 'XN' NO-GO NIPPLE r 11338' 1/2"OTIS XA SLIDING SLV 1 1 I 11419' H5-1/2"OTIS XN LANDING NIP NOGG, ID=4.455" LJ 11431' --15-1/2"BOT PBRASSY Z — 11478' —9-5/8'X5-1/2"BAKER SAB PKR 5-1/2"TBG-NPC, 17#,N-80,.0232 bpf,ID=4.892" —1 11486' TOP OF 4-1/2" TBG-NPC H 11486' \ / 11486' --I XO 5-1/2"X 4-1/2" I I 11540' -14-1/2"OTIS XN NIP NOGG,ID=3.725" 11598' —14-1/2"BOTMULESHOE 4-1/2"TBG-NPC, 12.6#,N-80,.0152 bpf,ID=3.958" H 11601' / 11601' —14-112"TUBING TAIL I 11565' HELM TUBING TAIL-LOGGED 3/11177 TOP OF 7"LNR —H 11759' 9-5/8"CSG,47#,MN-80,ID=8 681" -1 12076' 11759' -{T'LINER PATCH TOP 1116. PERFORATION SUMMARY REF LOG:CNL on 3/11/1977 ANGLE AT TOP PERF:49°@ 12377 Note. Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE 12377-12397 S 11/17/1987 12408-12423 S 11/17/1987 I 3-3/8' 4 12447-12450 0 11!05/1989 3-3/8' 4 12455-12460 0 11/05/1989 3-3/8" 12477-12486 S 11/17/1987 3-3/8" 6 12490-12492 0 4/9/1996 I 3-3/8" 6 12492-12500 O 4/9/1996 3-3/8" 6 12500-12502 0 4/9/1996 I 3-3/8" 6 12502-12505 0 4/9/1996 3-3/8" 6 12505-12520 0 4/9/1996 I 3-3/8" 6 12520-12522 0 4/9/1996 3-3/8" 6 12522-12526 0 5/23/1996 3-3/8" 6 12526-12535 0 5/23/1996 11111 11 12565' --I CMT(TAGGED CTM 11/23/87) 11111111 3-3/8" 6 12535-12542 0 5/23/1996 111111111111111 2-1/2" 3 12542-12549 0 6/5/1988 111111111111111 111111111111111 2-1/2" 3 12549-12562 0 6/5/1988 11111111 11111..4111/11/ It- 111 7"LNR,29#, N-80, .0371 bpf,ID=6.184" 12708' 11/*#y.�''', 12550' FISH-3'X 2-1/2"GO-DEVIL WIRE CUTTER TD --1 12715' .4.444446.4 DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/11/77 ORIGINAL COMPLETION WELL: 09-10 03/21/01 RN/TP CORRECTIONS PERMIT No: '176082 02/11/11 MB/JMD ADDED SSSV SAFETY NOTE AR No• 50-029-20235-00 01/10/12 TNIN/JMD ADDED H2S SAFETY NOTE SEC6,TION,R15E 3313.21 FEL 1578.53 FNL BP Exploration(Alas ka) bp RECEIVED 0 AOGCC AUG 21 2014 BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA LOG DATA) Date 21 -Aug -2014 Transmittal Number: 93373 If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents "aED 1 CD-ROM Containing OPEN HOLE Digital Log Data: 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-111 09-12, 09-13, 09-14, 09-15, 09-16, 09-171, 09-18, 09-19, 09-20, 14-26, 16-07, A-031 B-111 B-241 B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 The information on this CD is to be used for BP Exploration (Alaska) Inc. business only. If you are not the owner or licensed user of this CD, any disclosure, copying or use of the information on this CD is prohibited. If you obtain this Angela K. Sf CD by error, please return the CD to the address shown g ! below. BP will pay the postage. Thank you. Please Sign and gancpdc@bp.com i If found please return CD to: Doug Dortch BP Exploration Petrotechnical Da; ", PO Box 196612 ta Anchorage, AK 99519-6612 Attn: State of Alaska Attn: Makana Bender 333 W. 7th Ave, Suite 1 Anchorage, Alaska 99501 CD1of1 by 0 or External Distribution BPXA OH Log Data 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-11, B-24, B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 18 -AUG -2014 Petrotechnical Data_nler R2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 177-077 183-101 171-005 176-030 176-042 185-301 175-073 175-062 200-102 175-076 176-016 176-035 176-040 176-047 176-070 176-076 176-082 176-084 177-007 177-008 177-025 177-036 177-037 177-038 177-039 177-040 177-041 181-110 185-204 171-038 178-069 182-140 182-151 179-035 204-053 186-154 171-023 176-110 193-100 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Tuesday,May 07,2013 Jim --� - �,JIt3 P.I.Supervisor-`( ' SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 09-10 FROM: Jeff Turkington PRUDHOE BAY UNIT 09-10 Petroleum Inspector Src: Inspector Reviewed By: P.1.Supry --)-6(2--- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-10 API Well Number 50-029-20235-00-00 Inspector Name: Jeff Turkington Permit Number: 176-082-0 Inspection Date: 5/5/2013 Insp Num: mitJAT130505090827 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well� 09-10 - Type e Inj W'!TVD 8331 IA 'I 538 3026 - i 3013 3004 - 1760820 !Type Test SPT! 6oszo ! Yp ,Test psi� 2947 OA 479 551 • 668 728 Interval REQVAR P/F P Tubing 1 1393 1395 1395 1395 ` ' - J Notes: AA A1O 4E.025 for known OA re-pressurization which was indicated in this test.4.13 bbl to fill. SCANNED FEB 2 0 2014 Tuesday,May 07,2013 Page 1 of 1 STATE OF ALASKA • ALASKAOAND GAS CONSERVATION COMMISSIO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other 0 BRIGHTWATER Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver El Time Extension ❑ TREATMENT Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ _, 176 -0820 3. Address: P.O. Box 196612 Stratigraphic❑ Service El 6. API Number: Anchorage, AK 99519 -6612 . 50- 029 - 20235 -00 -00 8. Property Designation (Lease Number) : • 9. Well Name and Number: ADLO- 028345 - PBU 09 -10 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12715 feet Plugs (measured) 12565 (TOC) feet true vertical 9076.9 feet Junk (measured) 12550 feet Effective Depth measured 12715 feet Packer (measured) 11478 feet true vertical 9076.9 feet (true vertical) 8331 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 30 - 110 30 - 110 Surface 2697' 13 -3/8" 72# N -80 29 - 2726 29 - 2726 4930 2670 Production 12048' 9 -5/8" 47# MN -80 28 - 12076 28 - 8668 6870 4760 Liner 949' 7" 29# N -80 11759 - 12708 8486 - 9072 8160 7020 Liner Liner y "� � Perforation depth: Measured depth: SEE ATTACHED - i ,e. ,:1414 A1J _ _ True Vertical depth: _ _ _ Tubing: (size, grade, measured and true vertical depth) 5 -1/2" 17# NN =80 27 - 11486 27 - 8336 4-1/2" 12.6# N -80 11486 - 11601 8336 - 8398 Packers and SSSV (type, measured and true vertical depth) 5 -1/2" Baker SAB Packer 11478 — 8331 RECEIVE) 12. Stimulation or cement squeeze summary: AUG,. 9 an Intervals treated (measured): . measured): $l 1 OA eSk8 OU & 68$ 66111 Treatment descriptions including volumes used and final pressure: Artett 1II 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 5647 1378 Subsequent to operation: 5978 1368 14. Attachments: 15. Well Class after work: • Copies of Logs and Surveys Run Exploratory El Development ❑ Service 151 Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed N. - •e Las i _ Title Petrotechnical Data Technologist Signat ilimig Phone 564 -4091 Date 8/29/2011 ir 30•l Form 10-404 Revised 10/2010 RBDMS AUG 2 9 20 �� Submit Original Only 09 -10 176 -082 PERF ATTACHMENT Sw Name Operation Date Pert Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 09 -10 5/17/77 PER 12,377. 12,397. 8,854.63 8,867.65 09 -10 5/17/77 PER 12,408. 12,423. 8,874.83 8,884.63 09 -10 5/17/77 PER 12,447. 12,450. 8,900.34 8,902.3 09 -10 5/17/77 PER 12,455. 12,460. 8,905.58 8,908.86 09 -10 5/17/77 PER 12,477. 12,486. 8,920.02 8,925.92 09 -10 5/17/77 PER 12,492. 12,526. 8,929.86 8,952.17 09 -10 5/17/77 PER 12,535. 12,562. 8,958.07 8,975.79 09 -10 11/17/87 SQZ 12,377. 12,562. 8,854.63 8,975.79 09 -10 1/1/88 RPF 12,535. 12,549. 8,958.07 8,967.25 1 09 -10 6/5/88 RPF 12,549. 12,562. 8,967.25 8,975.79 09 -10 6/5/88 RPF 12,542. 12,549. 8,962.66 8,967.25 09 -10 11/5/89 RPF 12,447. 12,450. 8,900.34 8,902.3 • 09 -10 11/5/89 RPF 12,455. 12,460. 8,905.58 8,908.86 09 -10 11/5/89 RPF 12,492. 12,502. 8,929.86 8,936.42 09 -10 11/5/89 RPF 12,502. 12,526. 8,936.42 8,952.17 09 -10 4/5/95 RPF 12,500. 12,520. 8,935.11 8,948.23 09 -10 4/9/96 RPF 12,490. 12,502. 8,928.55 8,936.42 09 -10 4/9/96 RPF 12,502. 12,505. 8,936.42 8,938.39 09 -10 4/9/96 RPF 12,505. 12,522. 8,938.39 8,949.54 09 -10 5/23/96 APF 12,522. 12,542. 8,949.54 8,962.66 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE • M IS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • 09 -10 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/2/2011'. T /I /O= 180/820/260 Temp =Hot (Brightwater Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. Pumped 312 gal. EC9360A (Surfactant) Average of 28.3 gph for 11 hrs. Pumped a 'total of 312 gal. since start of project. Pumped 1658 gal. EC9378A ( Polymer ) Average of 150.7 gph for 11 hrs. Pumped a ;total of 1658 gal. since start of project 8/3/2011 * ** *WSR Continued from 8- 02 -11 * ** 'T /I /O= 1380/880/360 Temp =Hot (Brightwater Reservoir Sweep Mod) Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. Pumped 692 gal. EC9360A (Surfactant) Average of 28.8 gph for 24 hrs. Pumped a total of 1004 gal. since start of project. Pumped 3486 gal. EC9378A ( Polymer ) Average of 145.25 gph for 24 hrs. Pumped ;a total of 5144 gal. since start of project 8/4/2011' * ** *WSR Continued from 8- 03 -11 * ** T /I /O= 1370/820/460 Temp =Hot (Brightwater Reservoir Sweep Mod) I Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. Pumped 742 gal. EC9360A (Surfactant) Average of 30.9 gph for 24 hrs. Pumped a 'total of 1746 gal. since start of project. 'Pumped 3532 gal. EC9378A ( Polymer ) Average of 147 gph for 24 hrs. Pumped a total of 8676 gal. since start of project s � 8/5/2011' * ** *WSR Continued from 8- 04 -11 * ** T /I /0= 1370/820/460 Temp =Hot (Brightwater Reservoir Sweep Mod) ;Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. i Pumped 709 gal. EC9360A (Surfactant) Average of 29.5 gph for 24 hrs. Pumped a total of 2455 gal. since start of project. Pumped 3451 gal. EC9378A ( Polymer ) Average of 143.8 gph for 24 hrs. Pumped a ;total of 12127 gal. since start of project i � • • . . ���� ���� 8/6/2011 ****WSR Continued from B-O5-11~~ T/NO= 1370/820/460 Temp=Hot (Brightwater Reservoir Sweep Mod) !Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. 'Pumoad 108 EC9360A Average Pumped . gal. (Surfactant) hrs. :total of2583oa. since ota�ofpm�sct. gal. ( !Pumped 574 - i E�G378A/ �^�� ) )/4varage of 143.5gph for hrs. Pumped a | ' !total of 12701 gal. since start of project ! | ' . 8/7/2011 ****WSR Continued from nuedfn� B8-06-11*** - T/|/0= 1353/880/600 Temp=Hot (Brightwater Reservoir Sweep Mod) :Pump brightwater chemicals down TBG while on water injection @ - 5700 bwpd. !Pumped 019 gal. EC9360A (Surfactant) Average of 28.7 gph for 24 hrs. Pumped a ! !total of go| since ota�ofproject. ' ' /Pumood 3418 EC9378A Polymer 142.5 gph for hrs. Pumped a ' !total � of 16119 gal. since start ofproject � ! | | \ — ' ' 8/8/2011! ****WSR Continued from 8-07-11*** T7|/0=1427/880/020 Temp=Hot (Brightwater Reservoir Sweep Mod) Pumnp brightwater chemicals down TBG while on water injection @ - 5700 bwpd. | Pumped 774 gal. EC9360A (Surfactant) Average of 32.25 gph for 24 hrs. Pumped a !total of3S5O gal. since start ofproject. Pumped 3516 gal. EC9378A ( Polymer ) Average of 146.5 gph for 24 hrs. Pumped a !total of 19635 gal. since start of p 'ect j ! ! i | ' � . / ;/ �-- 8/9/2011 |-- Continued from 8-08-11**~ TWO= 1401/880/000 Temp=Hot (Brightwater Reservoir Sweep Mod) !Pump b����ohem��a���Gv��on��i�e�on@ iPumpad - 1gaiECS30OAUSurhaobanU Average of31.2 gph for 17 hrs. Pumped a ! total of 4487 gai since start of project. !Pumped 2379 gal. EC9378A ( Poyn�er)/�weroQaof 148.6 gph for 16 hrs. Pumped for nm jatobs of 22014 gal. since start of projec Brightwater Reservoir Sweep Mod complete FWHP'm = 1400/980/580 ' -'--' _ L'-- '- _ . -_ __- - _--------' --- ----- --'- '--- ------- � FLUIDS PUMPED GALS 4487 ]BC9360A (SURFACTANT) 22014 EC9378A (POLYMER) 20501 TOTAL WELLHEAD= FMC ACTUATOR= AXELSON SAFETY : WELL REQUIRES A SSSV WHEN KB. Et EV = 54' 09-10 ON M I. 80" - TIGHT SPOT BF.ELEV= ? KOP = 3035' Max Angle = 58 t 5944' Datum MD = 12376' Datum TVD= 8800' SS I 2190' 1_15-1/2" OTIS ROM SSSV NIP, ID = 4.562" 13 -3/8" CSG, 72 #, N -80, ID = 12.347" I--1 2726' HA Minimum ID = 3.725" @ 11540' 4-1/2" OTIS 'XN' NO -GO NIPPLE 1 1 I 11338' I— I5 -1/2" OTIS XA SLIDING SLV I i I 11419' H 5-1/2" OTIS XN LANDING NIP NOGG, ID = 4.455" I L J 11431' - I5 -1/2" BOT PBR ASSY I X Z.--I 11478' I- 19 -5/8" X 5 -1/2" BAKER SAB PKR I 5 -1/2" TBG -NPC, 17 #, N -80, .0232 bpf, ID = 4.892" H 11486' I \ / I 11486' I — I x0 5- 1/2" X 4-1/2" I I TOP OF 4 -1/2" TBG -NPC I - 1 11486' I 1 1 I 11540' I — { 4 -1/2" OTIS XN NIP NOGG, ID = 3.725" I 11598' H 4-1/2" BOT MULESHOE I 4 -1/2" TBG -NPC, 12.6 #, N-80, .0152 bpf, ID = 3.958" H 11601' I / I 11601' I- I 4 -1/2" TUBING TAIL 11565' I — ' ELM TUBING TAIL - LOGGED 3/11/77 I (TOP OF 7" LNR I—I 11759' 1 1 I 1 11759' H 7" LINER PATCH TOP I 1 9 -5/8" CSG, 47 #, MN-80, ID = 8.681" H 12076' I A PERFORATION SUMMARY REF LOG: CNL on 3/11/1977 ANGLE AT TOP PERF: 49 @ 12377 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 12377 -12397 S 11/17/1987 12408 -12423 S 11/17/1987 1 3 -3/8' 4 12447 -12450 0 11/05/1989 3 -3/8' 4 12455 -12460 0 11/05/1989 3 -3/8" 12477 -12486 S 11/17/1987 3 -3/8" 6 12490 -12492 0 4/9/1996 1 3 -3/8" 6 12492 -12500 0 4/9/1996 3 -3/8" 6 12500 -12502 0 4/9/1996 1 3 -3/8" 6 12502 -12505 0 4/9/1996 3 -3/8" 6 12505 -12520 0 4/9/1996 3 -3/8" 6 12520 -12522 0 4/9/1996 1 3 -3/8" 6 12522 -12526 0 5/23/1996 12565' CMT (TAGGED CTM 11 /23/87) 3 -3/8" 6 12526 -12535 0 5/23/1996 V���V�1�■�4�4♦4 I I� 3 -3/8" 6 12535 -12542 0 5/23/1996 0000 2 -1/2" 3 12542 -12549 0 6/5/1988 �4 + 0 2 -1/2" 3 12549 -12562 0 6/5/1988 04004 +�� ;� t St 04 1 7" LNR, 29 #, N - 80, .0371 bpf, ID = 6.184" 1 - 1 12708' � , 12550' --I FISH - 3' X 2 GO - DEVIL WIRE CUTTER I TD 1 12715' I � � i � i � i � i 0 + DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/11/77 ORIGINAL COMPLETION WELL: 09 -10 12/20/2000 SIS -SLT CONVERTED TO CANVAS PERMIT No: 76 -082 01/10/01 SIS -LG REVISION API No: 50- 029 - 20235 -00 03/21/01 RN/TP CORRECTIONS SEC6,TION,R15E 3313.21 FEL 1578.53 FNL 02/11/11 MB /JMD ADDED SSSV SAFETY NOTE BP Exploration (Alaska) MEMORANDUM • M EM O State of Alaska Alaska Oil and Gas Conservation Commission TO: ATE: Wednesday, May 18, 2011 Jim Regg egg ,, ) P.I. Supervisor i X 1 1 5'v�l Gl SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 09 -10 FROM: John Crisp PRUDHOE BAY UNIT 09 -10 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry -3 NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 09 - 10 API Well Number: 50 029 - 20235 - 00 - 00 Inspector Name: John Crisp Insp Num: mitJCr110517115220 Permit Number: 176 - 082 - Inspection Date: 5/13/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1 09 -10 TType Inj. I W � i TVD 8331 ' IA 1 500 2800 - 1 2480 I 2480 P.T.D 1760820 'ITypeTest SPT Test psi 1 2082 'l OA 80 80 80 80 Interval REQ "AR P/F P • Tubing I moo 1400 1400 1 1400 Notes: 24 month test for AA. 3.7 bbls pumped for test. 4, 1 MAY 2, 52011 Wednesday, May 18, 2011 Page 1 of 1 MEMORANDUM TO: Jim Regg P.I. Supervisor ~ C ( ~~(L`~ FROM: Chuck Scheve Petroleum Inspector State of Alaska • Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 20, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 09-10 PRUDHOE BAY UNIT 09-10 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv --)~~ Comm Well Name: PRUDHOE BAY UNIT 09-10 Insp Num: mitCS090520062053 Rel Insp Num: API Well Number: 50-029-20235-00-00 Inspector Name: Chuck Scheve Permit Number: 176-082-0 Inspection Date: 5/19/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well P.T.D 09-1o TYPe Inj. w 'I'~7D I~6oszo LypeTest SPT Test psi 8331 zosz.~s IA OA ao loo zsoo zoo ~~o zoo za7o zoo Interval REQvAR P/F P ~ Tubing 16s0 1650 16s0 16s0 NOtes: Pretest pressures observed and found stable ~ Wednesday, May 20, 2009 Page 1 of 1 From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com) Sent: Monday, May 11, 2009 11:36 AM ~~~ ~~~~ To: Regg, James B(DOA); Maunder, Thomas E(DOA); DOA AOGCC Prudhoe Bay Cc: NSU, ADW Well Integrity Engineer Subject: 09-10 (PTD #1760820) Wellhead Leak Gentlemen, / Weil 09-10 (PTD #1760820) is a produced water injection well currently under AA for IAxOA communication. During an MIT-IA to 2500 psi on 05/10/09 a small ted from the control line fittin s on the wellhead. The test was stopped immediately and the pressure was bled from the . e ea s stopped once the IA pressure was bled below 2000 psi. As per our conversation earlier, we plan to conduct wellhead diagnostic work on the pack-offs develop a remediation plan to prove competent casing and tubing integrity. Once the diagnostic work is completed we will contact you with our plan. Piease contact me with any questions. Thank you, Taylor Wellman filling in for Anna Dube/Andrea Hughes Office: 659-5102 Pager: 659-5100 x 1154 ~~;~,:~~~~~ ~.U L L ~"~ Zi~~1~; ~ 8/7/2009 • • " - - SARAH PALIM, GOVERAIOR ~~ ® ~~ ~ 333 W. 7th AVENUE, SUITE 100 w®~~9~1~~~--~®~ ,T® ~~~®~ i.+ ~! L ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907} 276-7542 ADMINISTIaATIVE APPROVAL AIO 4E.025 Mr. Steve Rossberg Wells Lvlanager BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 ~~,~~~~~ ~~N a ~ 2oa~ RE: PBU 09-10 (PTD 1760820) Request for Administrative Approval Dear Mr. Rossberg: In accordance with Rule 9 of Area Injection Order ("AIO") 04E.000, the Alaska Oil and Gas Conservation Commission ("AOGCC" or "Commission'') hereby grants BP Exploration (Alaska) Inc. ("BPXA")'s request for administrative approval to continue water injection in the subject well. PBU 09-10 exhibits outer annulus repressurization that is being managed by periodic pressure bleeds. AOGCC finds that BPXA has elected to perform no corrective action at this time on PBU 09-10. The Commission further finds that, based upon reported results of BPXA's diagnostic procedures and wellhead pressure trend plots, PBU 09-10 exhibits two competent barriers to the release of wren pressure. Accordingly, the Commission believes that the well's condition does not compromise overall well integrity so as to threaten human safety or the environment. AOGCC's administrative approval to continue water injection in PBU 09-10 is conditioned upon the following: 1. BPXA shall record wellhead pressures and injection rate dail~~; 2. BPXA shall submit to the AOGCC a monthly report of well pressures, injection rates, and OA pressure bleeds; 3. BPXA shall perform an MIT-IA every 2 years to 1.2 times the maximum anticipated well pressure; 4. BPXA shall limit the well's OA pressure to 1,000 psi; AIO 4E.025 September 17, 2007 Page 2 of 2 • • 5. BPXA shall immediately shut in the well and notify the AOGCC if there is any change in the well's mechanical condition; 6. After well shut in due to a change in the well's mechanical condition, AOGCC approval shall be required to restart injection, and 7. The MIT anniversary date is May 18, 2007. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 Pi~1 on the 23rd day following the date of this letter, or the Wert working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. aka and dated September 17, 2007. i Daniel T. Seamount, Jr. Commissioner ~~~ . . MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: .---, Jim Regg 1/;9 '._ P I S . '., ~¡;// .. upervlsor ' ,- 'l"{ DATE: Thursday, May 24, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATIOè\' (ALASKA) fNC 09-10 FROM: Jeff Jones Petroleum Inspector PRUDHOE BAY UNIT 09·10 \1((O~d- Src: Inspector Reviewed Bv: P.I. Suprv ~ Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT 09·10 Insp Num: mítJJ070519074545 Rei Insp N urn: API Well Number: 50-029·20235·00·00 Permit Number: 176-082·0 Inspector Name: Jeff Jones Inspection Date: 5/18/2007 1---- Well ! c-.. ' P.T.Di Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. 09·10 ¡Type Inj. ! W : TVD '~"~~iLJ\--;- 360 ¡ 2500 , 2485~~5 _ :"-=-____~_-- 1760820 !Ty!>eTest'¡ SPT ! T~st p~i~-=082:75: "Ò.~-=-~ 35~r=-520_ ._~ _530___~-¡-'5~ I ,--- r-~'--- 1750 i P/F P /' Tubing i 1680 1750 1750 ! Interval 4YRTST Notes: 1 we]] house inspected; no exceptions noted. 5CANNED JUN 0 6 2007 Thursday, May 24, 2007 Page 1 of 1 Schlumbepger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TIN: Beth Well NK-20 P2-34 N-14A 4-38/K-34 B-19A 15-318 MPF-89 D5 16-01 DS 16-15 DS 09-10 M-30 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 10889223 11072853 10991753 10933591 11058502 10942223 11132060 10980601 10980599 11058237 11072877 Log Description PPROF WIDEFT TEMPERATURE PRESSURE LOG LDL PPROF WIDEFT/GHOST RST MCNL 5CMT (PDC-GR) INJECTION PROFILE PPROF W/DEFT INJECTION PROFILE INJECTION PROFILE /9 Oir ~r Date 03/21/05 06/05/05 01/22/05 10/29/04 05/06/05 07/16/05 1 0/08/05 08/15/05 08/13/05 08/16/05 08/04/05 öCANNED NOV Ü 2 2005 10/18/05 NO. 3503 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe 8ay 8L 1 1 1 1 1 1 Color CD - 1 1 1 1 -' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 9u503 838 W ATTN: Beth I 6 / Received by: 17"c-~ut;~: F:!~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Tom_Maunder@admin.state,ak.us; Bob_Fleckenstein@admin.state.ak,us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay / PBU / Drill Site 09 06/06/03 John Cubbon Chuck Scheve ] Packer Depths (ft.) ] Pretest Initial 15 Min. 30 Min. I w~,p~-0~ i ~,n~.l s i M~,~v~I ~0.~q ~.~1 ~"~'N ~°1 ~°1 ~°1 ~°1 ,n,~.~ ~1 P'T'D'I1760700 I mypetestl P I mestpsil 2103l I Casin~J 300l 24401 24201 2420l P/FI PI Notes: I w~,,Io~,~o I ~,~,~.I si~,~v~I ~'"~'1 ~'~'1 'u~'n"l ~001 ~001 ~001 ~°01 'n'"~al "1 P.T.D.I1760820 I Type test ,., I P I Test psil 20831 I Casin~ll 1001 24601 24501 24501 P/Fi PI Notes: I Well109-20 Type Inj. P.T.D.I1770410 Notes: LLR of 0.8 BPM at 2300 psi. WellI P.T.D.I Notes: WellI Type Inj. P.T.D.I Notes: Test Details: Tests were 4 year MITIA's for UIC compliance. TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test dudng Workover O = Other (describe in notes) MIT Report Form Revised: 06/19/02 2003-0606_MIT_PBU_09-08 10 20.xls FYI: MITIA Forms Subject: Date: From: To: CC: FYI: MITIA Forms Thu, 12 Jun 2003 22:19:39 -0500 "NSU, ADW Well Integrity Engineer" <NSUADWWelllntegrityEngineer@BP.com> "AOGCC Bob Fleckenstein (E-mail)" <Bob_Fleckenstein@admin.state.ak.us>, "AOGCC Field Inspectors (E-mail)" <AOGCC_Prudhoe_Bay~admin.state.ak.us>, "AOGCC Winton Aubert (E-mail)" <Winton_Aubert~admin.state.ak.us>, "AOGCC Jim Regg (E-mail)" <Jim_Regg~admin.state.ak.us> "Rossberg, R Steven" <RossbeRS~BP.com>, "Engel, Harry R" <EngelHR~BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWellOperationsSupervisor~BP.com> Hello all. Attached are several MIT reports for recent 4-year MIT's conducted on injectors. All passed except 09-20, currently under evaluation. Note we've had email problems recently, some of these may have already been sent. Let me know if you have any questions. <<MIT PBU 01-11 06-12-03.xls>> <<MIT PBU 13-19 06-12-03.xls>> <<MIT PBU 14-27 06-12-03.xls>> <<MIT PBU 09-08,10,20 06-06-03.xls>> Joe Anders, P.E. / John Cubbon Well Integrity Engineer, BP Exploration, (Alaska) Inc. Work: (907) 659-5102 Mobile: (907) 943-1154 Pager: (907) 659-5100, x1154 Email: NSUADWWellIntegrityEngineer@bp.com ~_)MIT PBU 01-11 06-12-03.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel) I ~-~MIT PBU 13-19 06-12-03.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel) I ~ ~_)MITI PBU 14-27 06-12-03.xls Name: MIT PBU 14-27 06-12-03.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel) ] Encoding: ba~?~ I Name: MIT PBU 06-06-03.xls 09-08,1 0,20 ~__) MIT PBU 09-08,10,20 06-06-03.xlst Type: Microsoft( app li cati on/vnd.ms-exEXCel Worksheet ce 1) ilEncoding: base64 1 of 1 6/25/2003 3:10 PM MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner THRU: Jim Regg P.I. Supervisor DATE: June 6, 2003 SUBJECT: Mechanical Integrity Test DS 9 PBU FROM: Chuck ScheMe Petroleum Inspector NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. We,,I9-08IType,nj.I S IT.M.D. I ~413 I Tubingl 1850 11850 11850 I~0 Ilntervall 4 P.T.D.I 176-070 ITypetestI P ITestpsil 2103 I Casingl 300 I 2440 I 2420 I 2420 I P/FI _P Notes: WellI 9-10 ITypelnj. I S IT.M.D. 18331 I Tubingl 1700 I~00 I~00 I~00 Ilntervall 4 P.T.D.I 176-082 ITypetestl P ITestpsil 2083 I CasingI 100 I 24601 24501 24501 P/F I -P Notes: VVell P.T.D. Notes: Well P.T.D. Notes: P.T.D. Notes: 9-20IType,nj.I S IT.M.D. I~ I TubingI 1150 11150 I~o I~o I,nte~va, I 4 177-041 ITypetestl P ITestpsil 2141 I Casingl 360 123001 380 I I P/F I _F Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS I NJ. S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O= Other (describe in notes) Test's Details I traveled to BPXs DS9 and witnessed the routine 4 year MIT on wells 9-08, 9-10 and 9-20. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed with the wells 9-08 and 9. 10 demonstrating good mechanical integrity. Well 9-20 failed to pressure test and has an apparent casing leak. An injection rate of.8 bbl per minute was established at 2300 psi. The tubing and outer annulus pressures remained stable at 1150 psi and 10 psi throughout the test. When the pump was shut down the IA pressure fell rapidly back to 380 psi. The condition of this well was discussed with Jim Regg and it was allowed to remain on water injection pending further diagnostics. M.I.T.'s performed: _3 Number of Failures: 1 Attachments: Total Time during tests: 4 hours CC: MIT report form 5/12/00 L.G. 2003-0606 MIT PBU 09-20 cs.xls 6/24/2003 STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 25' E & 1581' N of NW cr Sec. 1, T10N, R15E, UM. At top of productive interval 1599' S & 1438' E of NW cr Sec. 6, T10N, R16E, UM. At effective depth At total depth 1579' S & 1707' E of NW cr Sec. 6, T1 ON, R16E, UM. 5. Type of Well Development Exploratory Stratigraphic Service X ORIGINAL 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-10i 9. Permit number/approval number 76-82 10. APl number 50 - 029-20235 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 12715 feet 9076 feet Plugs(measured) PBTD Tagged @ 12543' MD (5/23/96). Effective depth: measured 12543 feet true vertical 8964 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 300 Sx Arcticset 80' 80' Surface 2672' 13-3/8" 6400 Sx Arcticset 2726' 2726' Production 12022' 9-5/8" 1000 sx Class G 12076' 8667' Liner 949' 7" 330 sx Class G 12708' 9071' Perforation depth: measured 12447 - 12450'; 12455 - 12460'; 12490 - 12562' true vertical 8901 - 8903'; 8906 - 8910'; 8930 - 8977' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 11486' MD; 4-1/2", 12.6#, N-80, NPCT @ 11601' MD. Packers and SSSV (type and measured depth) Baker SAB Packer @11478' MD; Otis RQN SSSV ~i~2~:L. vJ~l~'~' ~' r~ 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure Alaska 0il & Gas Cons. 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 6O35 6232 Tubing Pressure 1857 1885 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~1~-- /'~lq. ~ Title Engineering Supervisor %rm 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE.~ 9-10i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 5/23/96 · MIRU & PT equipment. Reperforated: RIH w/perforating gun & shot 20' of perforations as follows: 12522- 12526' MD (Z1B) Ref. Log: CNL 3/11/77. 12535 - 12542' MD (Z1B) Added Perforations: 12526 - 12535' MD (Z1B) Ref. Log: CNL 3/11/77. Used a 3-3/8" carrier & shot 6 spf at 60 degree phasing with the well overbalanced. POOH w/perf gun. Noted all shots fired. Rigged down. Returned the well to produced water injection & obtained a valid injection rate. RECEIVED JUN 2 r~ 1~ Alaska Oil & Gas Cons, C0mmisslon Anch0r~,g9 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 AT-FN: Sherrie NO. 10246 Company: Alaska Oil & Gas Cons Comm Attn: Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501 6/18/96 Field: Prudhoe Bay Anadrill Anadrill Floppy Well Job # Log Description Date BL RF Sepia Survey Program Disk Calculation D.S. 4-30 ST 96~5~0 . ...CNT-D .i.'";~ 7/,~'G 960510 1 . D.S. 5-25 96137 TDT-P . ._j:~. ? ! '~',) 960425 1 D.S. 1-9A / PERFORATION RECORD 960529 1 1 D.S. 1-22A J PRODUCTION & GAS ENTRY LOG 960529 I 1 D.S. 2-18A ,/ TDT-P BORAX 960603 1 1 D.S. 7-13A '/ PERFORATION RECORD 960602 1 1 D.S. 9-10 PERFORATION RECORD 960523 1 1 D.S. 9j35 (~"J ~ pERFoRA-~ONRECORD 960526 I 1 D.S. 11-30 ~/' PERFC)RATION RECORD 960509 I 1 D.S. 12-31 -/ INJECTION PROFILE 960525 I 1 D.S. 13-16 '/ INJEC'rIGN PROFILE 960527 1 1 Dis. i4--'i'~ ,/' - " 'i~JEC'i:-~i-~'~ROFILE 960527 I I ........ D.S. 14-16 '/' LEAK I)EI'ECTION LOG 960523 I 1 D.S. 14-27 "/' '-- INJECTIOH PROFILE 960527 1 1 -- ., --- -- --. __ , , SIGNED' Please sign and return one copy of tl~is transmittal to Sherrie at the above address. Thank you. ..... STATE OF ALASKA ALASKA ._.'-AND GAS CONSERVATION COw, MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing ~ Alter casing ~ Repair well, Other 2. Name of Operator ARCO Alaska, inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 25' E & 1581' N of NW cr Sec. 1, T10N, R15E, UM. At top of productive interval 1599' S & 1438' E of NW cr Sec. 6, T10N, R16E, UM. At effective depth At total depth 1579' S & 1707' E of NW cr Sec. 6, T10N, R16E, UM. 5. Type of Well Development Exploratory Stratigraphic Service X ORIGINAL 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-10i 9. Permit number/approval number 76-82 10. APl number 50 - 029-20235 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2672' Production 12022' Liner 949' 12715 feet 9076 feet Plugs(measured) PBTD Tagged @ 12527' MD (4/5/96). 12527 feet 8955 feet Junk(measured) Size Cemented Measured depth True vertical depth 20" 300 Sx Arcticset 80' 80' 13-3/8" 6400 Sx Arcticset 2726' 2726' 9-5/8" 1000 sx Class G 12076' 8667' 7" 330 sx Class G 12708' 9071' Perforation depth: measured 12447-12450'; 12455-12460'; 12490-12526'; 12535-125~R'E C E IV E D true vertical 8901 - 8903'; 8906 - 8910'; 8930 - 8954'; 8959 - 8977' MAY 2 8 1996 Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 11486' MD; 4-1/2", 12.6#, N-80, NPCT @ 11601' MD. Naska 0tl & Gas Coils. Cci. mission Packers and SSSV (type and measured depth) Baker SAB Packer @ 11478' MD; Otis RQN SSSV @ 2190' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 769O 8683 Tubing Pressure 2025 2024 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil__ Gas__ Suspended I Service W~ (~ injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~~ '~t, ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE 9-10i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 4/5/96- RIH & tagged PBTD at 12527' MD. 4/9/95' MIRU & PT equipment. Added Perforations: Reperforated: RIH w/perforating gun & shot 32' of perforations as follows: 12490 - 12492' MD (Z1B) Ref. Log: CNL 3/11/77. 12492 - 12522' MD (Z1B) Ref. Log: CNL 3/11/77. Used 3-3/8" carriers & shot 6spf at 60 degree phasing with the well overbalanced. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to produced water injection & obtained a valid injection rate. RECEIVED MAY 2 8 1996 Alaska ~1 & Gas Cons. Commission Anchorage GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9448 Company: 5/5/95 Alaska Oil & Gas Cons Comm Attn' Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field' Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk ~o-~/~ 95-&0 D.S. 15-21'~ 95158 IDUALBURSTTDT-P 041995 1 D.S. 15-22'~ 95157 iDUALBURSTTDT-P 041995 1 D.S. 4-9 ~'~ .... !INJEC PROFILE 041 595 I 1 D.S. 4-23A IPERFRECORD 041 595 1 1 D.S. 6-14A PERFRECORD 041 795 1 1 D.S. 9-10 !INJEC PROFILE 041 895 I 1 D,S. 9-33 PERFRECORD 041 895 I 1 D.S. 15-21 DUAL BURST TDT-P 041 995 1 1 D.S. 15-22 DUAL BURST TDT-P 041 995 I 1 D.S. 18-02A PDC & PERF RECORD 041 895 I 1 VED Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Oil ~G~s con. Commission MAY DATE: AJaska O~fa~o~~~nmissi°n Anchorag~ncnorage GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie R£C IVF. D Alaska 0ii & 6as Cons. Commission A~chorage NO. 9431 Company: 4/26/95 Alaska Oil & Gas Cons Comm Attn' Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field' Well Job # Log Description Date BL Prudhoe Bay Floppy RF Sepia DIR MWD Disk D.S 2:24 ~'~'-"'7 ! CNT-D 040695 I 1 D.S. 3'13 '~ (~- '71 PERFREOORD 040795 I 1 D.S, 3' 13 PERF RECORD 040895 I 1 D.S, 4-13 i'~ ~'- ~ I INJECTION PROFILE 040795 1 1 D.S. 9-10 '7~" 32.- PERFRECORD 040595 1 1 D.S. 9-12 '7') -'7 PERFRECORD 040795 1 1 D.S. 9-23 ~, z./...~ GAS LIFT SURVEY 040695 I 1 D.S. 15-17 ~z./.c~ c~ CNT-G 040595 1 1 D.S. 18-24 ~ c~. ~_~ TBG. CUTTER RECORD 040695 1 1 _ -- __ SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALAS~ OILAND GAS CONSERVATION ~, MMISSION REPORTOF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARC(::) Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 25' E and 1581' N of NW Cr. Sect. 1, T10N, R15E, UM At top of productive interval 1599' S and 1438' E of NW Cr. Sect. 6, T10N, R16E, UM At effective depth At total depth 1579'S and 1707' E of NW Cr. Sect. 6, T10N, R16E, UM 5. Type of Well Development Exploratory Stratigraphic Service RECEIVED APR 24 1995 Oil & Gas Cons. Comrnissio Anchor~ ~, 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-10i 9. Permit number/approval number 76-82 10. APl number 50 - 029-20235 111. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 12715 feet 9076 feet Effective depth: measured 12521 feet true vertical 8951 feet Plugs(measured) PBTD Tagged @ 12521' MD (3/29/95) r'"'" i~''~ ~ '*~ ~ Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 300 Sx Arcticset 80' 80' Surface 2672' 13-3/8" 6400 Sx Arcticset 2726' 2726' Production 12022' 9-5/8" 1000 Sx Class 'G' 12076' 8667' Liner 949' 7" 330 Sx Class 'G' 12708' 9071' Perforation depth: measured 12447-12450'; 12455-12460'; 12492-12526'; 12535-12562' true vertical 8901-8903'; 8906-8910'; 8931-8954'; 8959-8977' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 11486 MD; 4-1/2", 12.69, N-80, NPCT @ 11601' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 11478' MD; Otis RQM SSSV @ 2190' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 7644 8496 Tubing Pressure 1908 1917 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil__ Gas__ Suspended__ Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ¢~.,~ ~. ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 CC: KZ. JWP Date ~'- .20-¢ ~ SUBMIT IN DUPLICATE 9-10i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 3/29/95: RIH & tagged PBTD at 12521' MD. 4/5/95: MIRU & PT equipment. RIH w/perforating gun & shot 20' of reperforations as follows: Reperforated: 12500 - 12520' MD (Z1B) Ref. Log: CNL 3/11/77. Used a 3-3/8" carrier & shot 6 spf at 180 degree phasing. Shot perforations with well overbalanced. POOH w/perf gun. Rigged down. Returned the well to produced water injection & obtained a valid injection rate. AP~ 2 4 1995 Gas Cons. c0mmisslon Anchor; '~ ARCO ALASKA, INC. P.O. BOX t0036e ANCHORAGE, ALASKA DATE: ?-i 2-9t REFERENCE: ARCO CASED HOLE FINALS i-ii i-ii i -2i 2-4 4-i ql, t(4-s6 N4-36 f4-37 )4-37 5-33 * 9-6 9-8 ?-iS 9-33 ** t t-3 t i-5 t2-t2 t3-i5 **** t 3-t 6 i6-i6 t?-t iT-ii &-5-9i PROD PROFILE--" 6-5-9i GR-COLLAR J 6-T-?i PROD PROFILE/ 6-30-9t CCL-PERF/ 6-ii-<Bi GAS LIFT/ 6- t 9-9 t CBT./ 6- ~ 9-9 t CET-~ 6-2i-9t PFC-GR (PACKER SETTING) 6-2i -9i CBTf 6-2t -9t CET~' 6-24-9i F'FC-GR (PACKER SETTING) 6-28-9i GR-CCL--- 7-2-9t COLLAR-F'ERF~ 7-2-9i PRODUCTION PACKER-- 6-30-9t SBL/GR/CCL- 6-30-9i CCL-PERF-- 6-i6-?i _ LEAK DETECTION~ 6-5-9i PERFORATION BREAKDOWN~ 6-23-9i COLLAR-PERF'- 4-i7-9i INJ PROFILEJ 6- t 3-9 t JEWELRYJ 6-t4-9i LEAK DETECTIOi~ 6-t 2-9t INJ PROFILE-' 6-8-9i DATA FRAC 'rEMF'~ 4-i7-9i LEAK DETECTION-- 6- t 2-9 i PROD PROF I LE--- · 7-i -9i PDK--t O0/GR/CCL-BORAX~ &-i6-~i LEAK DETECTION-- 6-t 7-9t INJ F'ROFILE--'- 6-t7-9t INJ PROFILE-- 6-t 3-9i INJECTION/PRODUCTION-- 6-i 6-9t PRI£M-- 5-8-9t LEAK DETECTION_. RUN t, 5" CAMCO RUN i, 5" CAMCO RUN t, 5" CAMCO RUN t, 5" ATLAS RUN t, 5' CAMCO RUN i, 5' $CH RUN t, 5" $CH RUN i, 5" ATLAS RUN t, 2'&5' $CH RUN t, 2"&5" $CH RUN t, 5" A'rLA~ RUN ~, 5' ATLAS RUN t, 5" AI'LA~ RUN ~, 5' ATLAS RUN i, 5' ATLAS RUN t, 5" Al'LAS RUN i, 2"&5' CAMCO RUN t, 5' CAMCO RUN t, 5" Al'LAS RUN J, 5' CAMCO RUN ~, 5' CAMCO RUN t, 2' CAMCO RUN i, 5' CAMCO RUN i, 5" CAMCO RUN J, 5" CAMCO RUN t, 5" CAMCO RUN i, ~' ATLAS RUN i, 2'&5' CAMCO RUN t, 5" CAMCO RUN i, 5" CAMCO RUN i, 5" CAMCO RUN J, 5' ATLA£ RUN i, 2'&5' CAMCO PLEASE SIGN AND RETURN THE ATTACHED HAVE A NICE DAY! $ONYA WALLACE AT0-t529 DISTRIBUTION CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL COPY AS RECEIPT OF DATA. ' APPROVED P H I L L I P S PB WELL FILE~ B P X ~TATE OF ALASKA TEXACO * CORRECTED LOG INTERVAL FOR 9-6 I£ 6780-7788 ** REFERENCE MiX UP ON TRANSMITTAL 9tt59 - POSSIBLE *** CORRECTED LOGGED INTERVAL FOR 9-48 I$ t375i-i425i **** CORRECTED AF'I$ FOR t3-i& I$ 58-029-2~823 DUPLICATE LOGS {::' I.. E A 3 E E: i (:-; N A N D R E: T LJ R N 'f' H E r-~ T 'T' A C H E D C 0 F' Y A Z R E C ti:: I F' T O F:' l.:' A "f' A ,. R lie C: E Z V E D B ",," HAVFZ A NICE DAY ~;'AI...LY HOF'FEC:K ER A T,.".:) .... 'i Y-- 2 9 RECEIVED ".:" F..' A N E.' :.":- ~5 ,, , 7 MAR - 8 t990 Alaska 0il & Gas Cons. Com~iSsiO~ r':ENTRAL ~:' 'r LF.E- $ C Ft [:' 'v',,~-;' Cl. N. ._,~:' ¥. 'i" E N..~ ~'' I r'i_ i'--i E X F:'L 0 R A T i' 0 N EXXON M A t:~.: A "[' H 0 N MOB:iL STATE OF ALASKA ALASF -'ILAND GAS CONSERVATION { IMISSION REPOR'I OF SUNDRY WELL OPI=RATIONS-- 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 25' E and 1581' N of NW Cr. Sect. l, T10N, R15E, UM At top of productive interval 1599' S and 1438' E of NW Cr. Sect. 6, T10N, R16E, UM At effective depth At total depth 1579' S and 1707' E of NW Cr. Sect. 6, T10N, R16E, Um Repair well Other 5. Type of Well Development ~ Exploratory Stratigraphic Service X 6. Datum of elevation(DF or KB) 54 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-10 9. Permit number/approval number 76-82 / 9-958 10. APl number 50 - 029-20235 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Sudace 2726' Production 12,076' Liner 949' 12,715 feet Plugs(measured) 9076 feet 12,628 feet 9019 feet Junk(measured) Size Ceme~ed Measumddepth True ve~lcalde~h 20" 300 Sx 80' 80' 13 3/8" 6400 Sx 2726' 2725.9' 9 5~" 1000Sx 12,076' 8667' 7" 330 Sx 12,708' 9071' Perforation depth: measured 12,377-12,397'; 12,408-12,423'; 12,447-12,450'; 12,455-12,460'; 12,477-12,486'; 12,492-12,526'; 12,535-12,562' true vertical 8856-8869'; 8876-8886'; 8901-8903'; 8906-8910'; 8920-8926'; 8931-8954'; 8959-8977' Tubing (size, grade, and measured depth) 5 1/2", 17#, N-80, 11,486; 4 1/2", 12.64¢, N-80, 11,486-11,601' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 11,478' MD; Otis RQM SSSV @ 2190'MD ., ( LJ i i i il i iEI i ' 13. Stimulation or cement squeeze summary , , -,.~ ,, Intervals treated(measured) None Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Reoresentative Daily Averaoe~et~e~ or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 3600 4700 Tubing Pressure 1600psi 1600psi 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil__ Gas_._ Suspended__ Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~--~j ~~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 Date ,~/~'~ SUBMIT IN DUPLICATE DS 9-10 .PERFORATING SUMMARY OF OPERATIONS Began perforating operation on 11/5/89. SI well, RU perforating unit, pressure tested equipment. RIH with 3 3/8" gun #1, opened up well and shot holes at 12518, 12526. Flowed well to cleanup. SI well, POOH, all shots fired. Flowed AL gas on well to depress liquid level. RIH with 3 3/8" gun #2, open up well and shot holes at 12502, 12510, 12494, 12458, 12448. Flowed well to cleanup. SI well, POOH, all shots fired. Secured well, RD, returned well to injection. Intervals perforated: Ref. CNL Footage (3/11/77) ('MD) Flow SPF Unit Perf Depths ('MD) Ref. CNL(3/11/77) 12447-12450 3 12455-12460 5 12492-12502 10 12502-12526 24 1/3 R6 1/5 R6 1/10 R7 1/8 R7 12448 12458 12494 12502,12510,12518 12526 ARCO ALASKA: F'.O. BOX i00S60 ANCHORAGE, ALA~'K A 995 i ;3 DATE' tt-8-89 REFERENCE' ARCO CASED HOLE FINAL2 3-2 i 0-t 3-89 EPILOG 5-t i 0-28.-89 COLLAR/F'ERIz 5-t8 ~0-28-89 PRODUCTION F'ACKER 6-7 t i-2-89 COLLAR. PERF 9-t 0 - ~ i -5-89 COLLAR/F'ERF t 4-33 i 0-29-89 COLLAR/PERF i 5-1 3 t t --3-89 COLLAR/F'ERF t 5-t 7 t 0-27-89 CNL-GAMMA t 5'-20 i 0-28-89 CF'E i 5-26, i ,'..';,-2'?-89 PAL RE..E ]~ VEL BY' HAVE A NICE DAY! SALLY HOFFECI<E~. ATO-t529 DISTRIBUI'iON RUNS' t&2, 5' RUN t , 5" RLJN t , .,.~='" RUN t, 5' RUN i, 5" RUN i , 5' RI. JNt , 5" RUN t , 5" RUN i , i/2'&i ' RUN i, ~.,' ~ CENTRAL FILES' ... F'H [LLIP2 · "¢ CHEVRON F'B WELL F'ILE2 D & M R & D · ,,-"' EXTEN..?ION EXPLORATION .,,-"' BPX - E,,XON ~ ~ ~,'TATE OF ALASKA MARATHON '-~ TEXACO ~ MOBIL A'FI...A$ ATL. A5~ A TI..A;};' A 'i" I... A ;S' ATI..A£' A i"/.. A £,' A'f'I..A~: *'..' I::; I.-i 2 C H * THE CORRECTED API~ FOR t5-i7 I$ 50-029-2tt'26,. ARCO Alaska, Inc. Prudhoe Bay. .4ineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 26, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS 9-10 Permit No. 76-82 Dear Mr. Chatterton: Attadhed, in triplicate, is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/GSS/ry Attachments CC' J. S. Dietz, BP Exploration J. Gruber, ATO-1478 PI(DS9-10) ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany 1. ~'ype of Request: STATE OF ALASKA ALASKA ~", AND GAS CONSERVATION CC /IISSION APPLICA, ,ON FOR SUNDRY API-'ROVAEOS[{ G i L Abandon Suspend Operation shutdown __ Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 25' E & 1581' N of NW Cr. Sec. 1, T10N, R15E, UM At top of productive interval 1599' S & 1438' E of NW Ct. Sec. 6, T10N, R16E, UM At effective depth At total depth 1579' S & 1707' E of NW Cr. Sec. 6, T10N, R16E, UM 5. Type of Well Development ,,L Exploratory Stratigraphic Service ,~ 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-10 9. Permit number 76-82 10. APl number 50 - 029-20235 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth' measured true vertical Effective depth: measured true vertical Casing Length Conductor 110' Surface 2726' Production 12076' Liner 949' 12715 feet Plugs(measured) 9076 feet 12628 feet 9019 feet Junk(measured) Size Cemented 20" 300 Sx 13-3/8" 6400 Sx 9-5/8" 1000 Sx 7" 330 Sx Measured depth.u~r~rt~cal depth 80' 80' 2726' 2725.9' 12076' 8667' 12708' 9071' Perforation depth: measured 12377-12397', 12408-12423', 12447-12450', 12455-12460', 12477-12486', 12492-12526', 12535-12562' true vertical 8856-8869', 8876-8886', 8901-8903', 8906-8910', 8920-8926', 8931-8954', 8959-8977' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, 11486; 4-1/2", 12.6#, N-80, 11486-11601' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 11478' MD; Otis RQM SSSV @ 2190' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation October 1989 Date approved 16. If proposal was verbally approved 15. Status of well classification as: Oil Gas Suspended WAG Injector Name of approver Service 7. I hereby, certify that the foregoing is true and correct to the best of my knowledge. Signed ~//~~~ Title Operations Engineering Manager Date Plug integrity BOP Test Location clearance 0o~)¥ I / Mechanical Integrity Test Subsequent form required 10- Original Signed By David W. Johnston Approved by order of the Commissioner Commissioner Date ///-//- ~' Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 9-10i PROPOSED REPERFORATIONS AP1 # 50-029-20235-00 PERMIT # 76-82 ARCO Alaska, Inc. proposes to reperforate previously perforated intervals in DS 9-10 within the Ivishak Sand from the Prudhoe Bay Unit. The proposed perforation intervals are as follows: Ref. CNL Footage Flow (3/11/77) ('MD) SPF Unit Perf Depths ('MD) RCf, CNL(3/11/77) 12447-12450 3 1/3 R6 12448 12455-12460 5 1/5 R6 12458 12492-12502 10 1/10 R7 12494 12502-12526 24 1/8 R7 12502,12510,12518 12526 Reference Log: CNL (3/11/77) Well 9-10 is a WAG injector. The wellbore fluid present when the perforations will be shot is water. The expected bottom hole pressure is 3650 psi. All wireline work will be done through a 5000 psi WP BOP/lubricator, tested to 1.2 times the maximum expected surface pressure (diagram attached). 4 3 2 1. 5000 PS1 7" WELLHEAD CONNECTOR FLANGE 2. ,5000 PS1 WIRELINE RAMS (VARIABLE SIZE) 5. ,5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF HIRELINE BOP EOUIPMENT ARCO ALASKA, INC P ·0 · BOX i ANCHORAGE, ALASKA 995i DATE · i -~ 9-89 REFERENCE' ARCO CASED HOLE FINALS 2_~.w i -i i -89 2-2;3 i-i i -89 3-6 i 2-2S-88 S-i 2 t-t 2-89 3-i.- '~ i-i 0-89 4-5 i 2-2t-88 5-5 i i-28-88 7-3S i 2-22-88 9.-i (3 i ~._? z,_~:~ i i -26 i -i .5-89 i ~---i ~ i ~-"~ ~Rc:, RICS/RATO, F'I)K/CNL OVERLAYS PDK-i ¢'G/CCL/GAMMA MULTIRATE INJECTION PROFILE VERTILOG TUBING CUTTER F'RODUCTION F'ROFILE EPILOG I_EAK DETEC'FZON INJECTION PR. OF]:L_E TEMF' StJRVEY COLLAR/F'ERF PRODUCTION F'ROFILE PLEASE SIGN AND RETURN THE ATTACHED 'COPY AS RECEIF'T OF RUN i, 5" F,'UN i, 5" RUN i , ..,.="" RtJN i, 5' RUN i, 5" RUN i, _, '=' RUN '~) ~'" RUN i, 5' RLJi',.J. i, '5" RUN t , 5 · RLJN t, 5" DATA .,. A '¥' i_ A ~ C A ~-i C 0 AFLA£ A'¥'LAS CAHC:O ATLAS CAMCO CAMCO A'i"I_AS C A ~'i C 0 RECEIVED BY HAVE A NICE DAY! SALLY FtOFFECKER ATO-~ 5-'29 TRAN$ AF'F'ROVIED .... ~~._ DISTRIBUTION .~ CENTRAL FILES ~ CI-IEVRON D & M ~ EXTENSION EXFLUR~IION · ..'"' E,,,~,ON MARATHON ~ MOBIL :"' Pt"t I t..1_ l F',~ F'B WEI..L FILES R & D '.- .., AF'L: ~-'"'STATF' OF ALASKA 'l" E X A C 0 "11' I:[' F' I;:' !ii R' [:[ KI F: F' ' ~.~ !7 f': fill f": ~ ,19 lC lID 14 F:I 1. I!:' F' T N ~ I F' !. F' t~,? F' N T f'; N r..~ K! D I-7 t::' TI IR' N T kt [!' ~'T 'T' ~ F: ~.! F' ¥) fi: F'I [:' Y t.~ N R' I? f':. F' T F:' 'T' fl F' T) ~.,'f' F..~ .. ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office i~o× 100360 Anchorage, Alaska 99510-0380 Telephone 907 263 4246 Donald F. Scheve Operaiior~s Engineering Manager July 5, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-10 Approval No. 7-549 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp At ta chment cc: Standard Alaska Production Company J. Gruber, AT0-1478 71 (DS 9-10)Wl-3 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~,i; Stimulate [] Plugging L~'~ Perforate ~ Pull tubing Alter Casing ~-] Other ~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 '¢ZC4::)c~ti~n~P-~Y~-e~l ~ So~f~ Cr. Sec. 1, T10N, R15E, UM At top of productive interval 1599''S & 1438' E of NW Cr. Sec. 6, T10N, R16E, UM At effective depth depth & 1707' E of NW Cr. Sec. 6, T10N, R16E, UM 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-10 t 8. Approval number 7-549 9. APl number 50-- 029-20235 10. Pool Prudhoe Bay Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 12715 feet 9076 feet Plugs (measured) Effective depth: measured 12628 feet true vertical 9019 feet Junk (measured) Casing Length Size Cemented Structural 110' 20" 300 Sx Conductor 2726' 13-3/8" 6400 Sx Surface Intermediate 12076' 9-5/8" 1000 SX Production 949' 7" 330 Sx Liner Perforation depth: measured 12535-12562' true vertical 8959-8976' z .Tub[rlg,,(si;~, gr..ade, a.n.d_ _mea .s~J~d depth) ~ , l/?~, ~-su, tt4Ub; 4~ , 12.6¢~, N-80, 11486-11601' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 11478' MD; Otis RQM SSSV @ 2190' MD Measured depth 80' 2726' 12076' 12708' ~ue Verticaldepth 80' 2725,9' 8667' 9071' 12. Stimulation or cement squeeze summary Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Prior to well operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Injector -- 15000 -- Tubing Pressure 1500 Subsequent to operation 14. Attachments Daily Report of Well Operations [] lflflfl -, Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correct to the best of my knowledge , Signed .... TitleOperations Engineering Manager Form 10-404 Rev. 12-1-85WELLS/Il2 T. A. Billingsley, 265-6871 Submit in Duplicate DS 9-10i COILED TUBING UNIT CEMENT SQUEEZE INJECTION PROFILE MODIFICATION 11/16/87 Pumped pre-squeeze acid wash through coiled tubing. Acid volumes plus additives as follows: 30 bbls 15% HC1 30 bbls 6% HC1/1.5% HF 30 bbls 15% HC1 Return well to injection. 11/17/87 Pumped 48 bbls cement through coiled tubing. Obtained 1300 psi squeeze pressure and held for 60 minutes. Contaminated cement in wellbore. Shut in well overnight. Squeezed Perforations: 12377-12397' 12408-12423' 12447-12450' 12455-12460' 12477-12486' 12492-12526' 12535-12562' Ref: CNL 3/11/77 11/18/87 Jetted out contaminated cement. Left well shut in. 1/1/88 Reerforate: Ref. CNL 3/11/77 12535-12549' 6 spf Could not shoot any lower due to cement left in wellbore. 5/1-2/88 Underreamed 12550-12576' Ref: CNL 3/11/77 6/5/88 Reperforate: 12542-12562' 6 spf Return to injection. WELL S / 112 I.~'t.TFI!!:RI::'HF.':F' ARr.:fi C~.?;F..T) I.-li]t F Ft'ix-iF~l.. I-I ~'.", 'u' 1::i ,.':':', i'.l T ,"'".!:-- !'i ,'::, Y ~ !::' F' I'.-.. ,"].:. Y Iq t~7 W i'-.~ 1--- 'T T ~-:;, 'i",."i- i ':.':: '::-~':i;'.. /q I,,_,,,,,,"' Alaska 0ii & Gas Cons. Commission Anchorage ~: ,-.fY? ' , ?.-,::,,:.:.,,.,:,.:.. :,,:.;.!::~ ? 'i~.~ .~ , ,.:-., ,::..~:. ,~.. ,.-:-, ,, ,:-.,-i ~~~&..~..~. ~.'4..~x~:' ~--x~- ....... · 1~ ................... ~ ........... ,~.., ..................... i) i' %; T i;;: T P, i i i ! Fi 'ARCO Alaska, In( Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 18, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-10 Permit No. 76-82 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company P1 (DS 9-10)Wl-3 to be RECEIVED AuG I ? ,.fl87 Alaska 0il & Gas Cons. Commission Anchorage WELLS/~Rlc~ Alaska, Inc. ism Subsidiary o, AtlanticRichfieldCompany STATE OF ALASKA ALAbc, A OIL AND GAS CONSERVATION CON,,,~ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well E] Alter casing [1 Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 54' RKB feet 3. Address P.O. Box 100360~ Anchorage~ AK 99510 4. Location of well at surface 25' E & 1581' N of NW Cr. Sec. 1, T10N, R15E, UM At top of productive interval 1599' S & 1438' E of NW Cr. Sec. 6, T10N, R16E, UM At effective depth At total depth 1579' S & 1707' E of NW Cr. Sec. 6~ Ti0N~ R16E, UM 11. Present well condition summary Total depth: measured 12715 feet Plugs (measured) true vertical 9076 feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-10 ///j~¢,t~ r 8. Permit number 76-82 9. APl number 50-- 029-20235 10. Pool Prudhoe Bay 0il Pool Effective depth: measured 12628 feet true vertical 9019 feet Casing Length Size Structural Conductor 110' 20" 300 Sx Surface 2726 ' 13-3/8" 6400 Sx Intermediate Production 12076 ' 9-5/8" 1000 Sx Liner 949 ' 7" 330 Sx Junk(measured) Cemented Perforation depth: measured 12377-12397', 12408-12423', 12447-12450', 12455-12460' true vertical 12535-12562' 8856-8869', 8876-8886', 8901-8903', 8906-8910', 8920-8926' Tubing (size, grade and measured depth) 5½", 17#, N-80, 11486; 4½", 12.6#, N-80, 11486-11601' MD Packers and SSSV (type and measured depth) Raker SAB Packer fa 11478' MD' Ot~.~ RQM SSSV fa 2190' MD Measured depth Rue Verticaldepth 80' 80' 2726' 2725.9' 12076' 8667' 12708' 9071' , 12477-12486' 12492-12526' , 8931-8954' 12.Attachments , 8959-8977' Description summary of proposal I~ Detailed operations program Ep~ ~-P~kr~hL~D 13. Estimated date for commencing operation October 1987 14. If proposal was verbally approve~ubsequent VVork Repor[ed on ?// Name of approver _Fo,,~z:n No./10--///t¢{/IOated__7__/o"-/~ Alaska 0il & Gas Cons. Commission Date approved Anchorage 15. I hereby ¢,~rtify that the foregoing is true and correct to the best of my knowledge Signed ~-//~~~~ Title Operations En~ineerin~ Manager Commission Use Only Date ~ ~/~' 7 Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI ? --~,- Lf'~' Approved by Form 10-403 Rev 12-1-85 Commissioner WELLS/Il2 T. A. Billingsley, 2b.b-b~5/l by order of the commission Date ~::2,._! ¢~>,'7 Submit in tripli~cate ~ DS 9-10 CTU SQUEEZE PROCEDURE · Clean out well to 12628' with coiled tubing. Last PBTD was 12588' on 11127186. · RU coiled tubing. Ensure well is fluid packed by continuing seawater injection until cement nears perforations. 3. Lay in 50 bbls of cement. 4. Pressure up on squeeze to 5000 psi BHP and hold for 1 hours. 5. Contaminate cement to PBTD. 6. Jet out contaminated cement. 7. Wait at least two weeks before reperforating. 8. Nitrogen lift top 2000' of fluid to provide drawdown during perforating. 9. Reperforate the bottom Lower Romeo interval. Reference CNL 3/11/77. 12535-12562' Lower Romeo 6 SPF 10. Evaluate injectivity into Lower Romeo. Perform stimulation if necessary (separate AFE). 11. Reperforate remaining Lower Romeo, Upper Romeo and Tango at limited shot density. Reference CNL 3/11/77. 12377-12397' 12408-12423' 12447-12450' 12455-12460' 12477-12486' 12492-12526' Tango Tango Upper Romeo Upper Romeo Upper Romeo Lower Romeo Limited SPF Limited SPF Limited SPF Limited SPF Limited SPF Limited SPF 12. Return well to injection. 13. Run post-squeeze injection profile. Alaska Oit & Gas Cons, Comm[ssior~ Anchorage WELLS/il2 3 2 1. SD00 PSi ?" WELLHEAD CONNECIOR rLANG[ 2. 5000 PS! WIRE. LINE RAMS (VAP, IABL[ SIZE) 3. 5000 PSI 4 1/6" LUBRICAIOR 4. 5000 PSi 4 1/6" F'LOW lUbE PAcK-orr WIRELINE BOP EOUIPMENT Jl i imll i ii i 6 5 4 .'5 2 1. 5000 PSI ?" WELLHEAD CONNEC10R FLANGE 2. 5000 PSi 4 1/16" PIPE 3. 5000 PSi 4 1/6" ~RAUL~ SLIPS 4. 5000 PSI 4 1/6" SHE~ 5. 5000 PSi 4 1/6" BLIND R~S 6. 5000 PS1 4 1/16" STUFFING BOX An~;horage · . . COILED 'I'UBINO UNI'T BOP EOUIPMENT · · I I II II I ARCO ALas'ka, Inc F:'.O. Box t0.0360 Anchorage, Ataska 99510 D A T E ' D e c e m b e R F F E R El N C El · A '~-"~ ~ ~-27-86 4-i S I t -24-86 9-4 t ~ .-"z0-86 ~9-i 0 t t -SG-86 I 6-2 i i -22-S6 f 7-i i i -27-86 i o_, i ~ -20-~6 r I t ~ t 986 RCO Ca.~ed HoLe F'i'na/ Fi.'. ti ii R u n R u 'n R :.ln Fi.'. u'n P. u 'n R ti rJ I-R R u 'n i, i; i, i, t, I, t, i, i, C: a m c o C a m c: ,::, C a m c o I.~ .'3 III C: C) E: a m c c, (': a hi C 0 C a m C o C a m c o F'Lease s ig'n a'nd ~.:ece J veal By HAVE A -- -- ~ :..~ ~ "~" F.'. C.' Z a i'~ A T O- i 5 2 9 ,~- TRAN:? $S,__.,8i 5 ~ Cen't',raL Fi Le~ ~ F:n i '._L ~ Chev':-c.,r.., F"=. ~e L: F'i La_--. Z.,, ~., ~.. ,, " Ex * . 2::?: -.. ,.e'ns~ c,~"~ L=.:,~F: Lora -'t. i c:'n ,.,.- -~ L':* += f ALaska Hob i ~ ARCO A~aska, Inc~ F'~O~ Box ~00S60 A n c h o r ,."-: g e, A l a ~.;~ k m DATE° I) ecember 5 ~oo~. REFERENCE' ARCO Ca.?ed Hol. e Final :'?c h ,? ,'.: h "':: c: h Ec. h .?,: h r / TRAN£ ~86798 Di£TRiBUTin~-~,_,,: Cer.,±raL Fi [e~ :.i:h err on L.' C-,: :, .~: = z ' _ ,. it:ii ~x :~iqz Iol] Fxp Lora"- ~ E x x o'n ;.: r~ a 'r ,2,_, 't,. h o'n ~ Mob i [ ARCO A£aska, Inc. I":'~(;). Box 100360 Anchorage, ALaska 99510 DATE'. S'ep.'tember 2"'...., J 986 · REFERENCE: ARCO Cm~ed Hol. e Final -"~i -6 9-3-86 c' , ,.,p inner I_og Run i ~-8 9-8-86 Inj. F'rofi Le Run t, ~t-'-t 5 8-3t -86 F Lowme~er Run i , ~t-t'7 8-3t-86 ,~9pinner Log F(un t, ~-5 9-3-86 ~'pinner Log Run t, ~S-23 9-4-86 GR/~PIN/WHUT Run t, ~S- 2 3 9-'7 - 8 6 F' u m p i n T e mp, S' u r v e y R t~ ~t , ~-24 9-7-86 F'ump in Temp. ,~urvey Run ~ , ~--24 9-6-86 GR/YF'IN/WHUT Run ~ , ~3-28 9-5-86 Pump in Temp. ~urvey Run ~, ~5-.-4 9-4-86 ,.~epinner Log Run t, ~5-tt 9-4-86 17pinner Log Run t, ~-t0 9-7-86 In.j. F'rofi te Run t, 9 ~8 8-3t-86 TEMF' Log Run t, ~-SS 8--28-86 S'pinner Log Run t, ~~--t3 9/5-6/86 3'pinner Log Run t, 5 ' 5 ' 5' 5 ' 5' 5 ' 5' 5' 5' 5' 5' 5' 2' 5" 5' 5' C a title 0 C a m c: o Ca f~lC 0 C a m c o C a m~ o C a m c o C a m c o C a t~l C: o C a m c o C a m c o Camco C a m c o Ca ~lc o Ca ~lc o C a m c o C a m c o F:' I. e a r.,' e s i g n a~ u r n t h~ 't a c: ti e d c o r.~%~a-~ r e c: e i p ~ o f , C ED I.-IA ~ '~-- *"'~ ~ ~a~ Oil & ~as Oons. Commission ~ , / / N Anchorage R o s ~n n e P e e k/ ATO-~ . cia ~a, D I S' T R I B U T I 0 N ARCO Alaska, inc Post Office ~ox 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: September 5, 1985 Reference: ARCO CH Finals · ~6-3--~--' Spinner 8-22/23'85 'Run 1 5" Spinner 8-21-85 1 5" 9-20 Spinner 8-22-85 1 5" 14-35 Epilog 5-11-85 1 5" 15-10 Temp log 8-28-85 1 5" Camco Camco Camco DA Camco Please s ~~.. c~~..~~~~ ign as c p o t . Received Pam Lambert ATO 1429C Trans 305 RECEIVED $ F..sP o 919 5 b,~ ,'- ' o ,6.~s. Commission Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R&D Sohio State.~f_..Alaska .. Texaco ARCO Alaska. Inc. ~s a Subsidiary of .~th, nti,-t:li,-hfioh-,," ...... ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: May 9, 1985 Reference: ARCO CH Finals 9-10 Spinner 4-19-85 12-27 ~ 4-17-85 run 1 5" Camco 1 5" Camco ~/Please Received by Pam Lambert ATO 1429C Trans 100 sign as receipt of data. · ; ~ ~ '" u -- ; Chevron Mobil E & P D & M Phillips Expl. Services PB Well Files Ext. Exploration R & D Exxon Sohio Marathon State of Alaska Mobil Texaco ARCO Alaska, Inc ..... Prudhoe Bay E leering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 22, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-6 DS 3-7 DS 3-10 DS 3-18 DS 4-6 DS 4-8 DS 4-11 DS 4-14 DS 4-15 DS 9-8 DS 9-10 DS 9-12 DS 9-14 DS 9-15 DS 9-16 Permit # 76-60 Permit # 76-53 Permit # 79-21 Permit # 79-103 Permit # 76-42 Permit # 76-10 Permit # 78-6 Permit # 78-36 Permit # 78-37 Permit # 76-70 Permit # 76-82 Permit # 77-7 Permit # 77-25 Permit # 77-36 Permit # 77-37 DS 9-18 DS 9-17 DS 9-19 DS 9-20 DS 11-2 DS 16-1 DS 16-2 DS 16-3 DS 16-5 Permit # 77-39 Permit # 77-38 Permit # 77-40 Permit # 77-41 Permit # 81-128 Permit # 80-136 Permit # 80-150 Permit # 76-83 Permit # 81-37 DS 16-10 Permit # 80-04 DS 16-11 Permit # 80-118 DS 16-16 Permit # 80-127 DS 17-6 Permit # 80-132 DS 17-8 Permit # 81-74 DS 17-10 Permit # 81-97 Dear Hr. Chatterton: Attached are Subsequent Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve At t achment s JAN 2 5 cc: Sohio Alaska ?etroIeum Company Alaska Oil & Gas Cons. CommissMD Anchorage ARCO Alaska, Inc. Is a Subsidiary of AflantlcRIchfleldCompany STATE OF ALASKA ALASKA UIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL,'E~] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-82 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20235 OTHER [] 4. Location of Well 25'E & 1581'N of SW or Sec. 1, T10N, R15E, UM 1599'S & 1438'E of NW cr Sec. 6, T10N, R16E, UM 1579'S & 1707'E of NWcr Sec. 6, T10N, R16E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28324 9. Unit or Lease Name Prudhoe. Bay Unit 10. Well Number DS 9-10 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO klaska, Inc. has converted DS 9-10 to water injection service. The well is part of the Flow Station 2 waterflood project. The well began receiving water on June 14, 1984. 14. I hereby f, el~ify that the f95egoing is true and correct to the best of my knowledge. The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 13, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9 Water Injectors Permit Nos: 76-70, 76-82, 77-7, 77-25, 77-36, 77-37, 77-38, 77-39, 77-40, 77-41 Enclosed are the Sundry Notices for Change of Well Status for the proposed Drill Site 9 Water Injectors. Very truly yours, D. F. Scheve DFS:SDC:kg Enclosures cc: SOHIO Alaska Petroleum Co. RECEIVED JUN 1 · lg84 Alaska Oil & Gas Cons. Comrnissior~ Anchorage STATE OF ALASKA _ ALASKA ~, _AND GAS CONSERVATION CC ¢IlSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL[] OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-82 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20235 4. Location of Well 25'E & 1581'N of SW cr Sec. 1, T10N, R15E, UM 1599'S & 1438'E of NW cr Sec, 6, T10N, R16E, UM 1579'S & 1707'E of NW cr Sec. 6, T10N, R16E,UM 5. Elevation in feet (indicate KB DF etc.) I 6. Lease Designation and Serial No. 54' RKB [ ADL 28345 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-10 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [~ Pulling Tubing [] (Note: Report multiple completions on Form 10~407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to change Well 9-10 status from oil producer to water injector. It will be operated as part of the Prudhoe Bay Waterflood Project. RECEIVED JUN ! 4 ]984 Alaska 011 & Gas Cons. Commission Anchorage 14. ~ hereby certify that the foregoing is true and correct to the best of my knowledge. Signed_ ~ ~'~/~ ~,/~, ~"~ Title Regional Engineer The space below for Commission use Date _. Conditions of Approval, if any: O~IGINAL ~IGNED BY LOHHIE C. SMITll Approved by COMM ISa ION ER Approved Copy R~turn~d __ .... By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate AH(JO Alaska, Inc. Post Office~3,.ox 360 Anchorag~ aska 99510 Telephone ~,~7' 277 5637 Apri! 2, 1984 Reference: ARCO Pressure Data DoS. 3-10'/~/3-18-84 D.S. 3-15~/~z3-18-84 D.S. 3-18,// 3-18-84 D.S. 4-5/" 3-17-84 · D.S. 4-16z/~ 3-9-84 D.S. 9-1:-?~ 3-18-84 DoS. 9-6 ~/ 3-18-84 D.S. 9-10 '''~ 3-19-84 D.S. 11-2-' 3-17-84 D.S. !3-27 j~ 3-4-84 D.S. 13-28~'~ 3-5-84 ~3-5-84 D.S. 13-29~ 3-12-84 D.So 14-23~' 3-10-84 D.So 14-24 '~ 3-10-84 D.S. 14-25 .......3-11-84 Static Survey Static Survey Static Survey Static Survey PBU ~ Static Survey Static Survey Static Survey Static Survey Static Survey Static Survey PBU Data Sheet Static Survey Static Survey Static Survey Static Survey Camco Camco Otis Camco Camco Otis Camco Camco Otis DA DA DA Otis Otis Otis ~ Pl~ease sign and return the attached HAVE A-HAPPY copy as EASTER! receipt of data. Kelly McFarland ATO-1429F Trans. # 112 DISTRIBUTION Chevron D&M Dallas Drilling Ext. Exploration Exxon Getty Marathon Mobil E & P Phillips Prudhoe Bay Well Files R & D Carolyn Smith Sohio State of Alaska Bill Sheffield, Governor ALASKA OIL A~ID GAS ~,O#S£RVATIOtV March 29, 1984 3001 PORCUPINE DRIVE ANCHORAGE,ALASKA 99501.;'3192 TELEPHONE(907) 279-1433 A D M I N I S T R A ~ T V E A P P R O V A L NO. 192.1 Re: The application of ARCO Alaska, Inc. to substitute static bottomhole pressure surveys for transient pressure s~rveys in Prudhoe Bay Unit wells DS 3-10, DS 3-15, DS 3-18, DS 4-1, DS 4-5, DS 4-11, DS 9-1, DS 9-6, DS 9-10, DS 16-1 and DS 16-9. Mr. D. F. Scheve Regional Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Dear Mr. Scheve: Application for exceptions to Rule 6 of CO 165 was received March 23, 1984. Exception to CO 165 Rule 6(c) for PBU wells DS 4-5 and DS 9-6 and exception to CO 165 Rule 6(d) was requested for PBU wells DS 3-10, DS 3-15, DS 3-18, DS 4-!, DS 4-1!, DS 9-1, DS 9-10, DS 16-1 and DS 16-9. ARCO Alaska, Inc.'s application requests substitution of static bottomhole pressure surveys for the transient surveys required in Rule 6(c) and (d) of CO 165. These static pressure measurements were taken during the scheduled FS2 shut:do,ca (March 12-19) after a shut-in of approximately seven days. Pursuant to CO 188 and 192 it has been determined that static bottomhole pressure surveys serve the intent and purpose of Rule 6 of CO 165 and may be substituted for the transient survey. The Alaska Oil and Gas Conservation Co~zission hereby authorizes substitution of static bottomhole pressure surveys for transient surveys in PBU wells DS 3-10, DS 3-15, DS 3-18, DS 4-1, DS 4-5, DS 4-11, DS 9-1, DS 9-6, DS 9-10, DS 16-1 and DS 16-9 pursuant to Rule 2 of CO 192. very trill, Lonnie C. Smith Commissioner BY ORDER OF THE COM~_ISSION lc ARCO Alaska. In Prudhoe B~,¢ Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 15, 1984 C. V. Chatterton STATE OF ALASKA Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: RE: Prudhoe Bay Unit DS 3-10 Permit No. 79-21 DS 3-15 Permit No. 79-92 DS 3-18 Permit No. 79-103 DS 4-1 Permit No. 70-42 DS 4-5 Permit No. 71-25 DS 4-11 Permit No. 78-6 DS 9-1 Permit No. 75-76 DS 9-6 Permit No. 76-48 DS 9-10 Permit No. 76-82 DS 16-1 Permit No. 80-136 DS 16-9 Permit No. 81-19 Enclosed are Sundry Notices recuesting permission to substitute static bottomhole pressure surveys in place of transient pressure test prescribed in Conservation Order 165, Rule 6, on key wells 4-5 and 9-6, and section wells 3-10, 3-15, 3-18, 4-1, 4-11, 9-], 9-10, 16-1 and 16-9. The static pressure measurements on these eleven wells are part of a package being planned to obtain a baseline reservoir pressure in the FS2 waterflood area prior to the start of water injection. Each well will be shut-in for approximately seven days prior to its survey. We believe that these static pressure surveys will provide a better interpretation of reservoir pressure in the FS2 area than transient pressure surveys and will satisfy the intent of Conservation Order 165, Rules 6(c) and 6(d). If you have any questions concerning this request, please contact Dan Cavin at 263-4268. Very truly yours, D. F. Scheve DFS/DLL/STATE/lmh cc: SOHIO Petroleum Company File Pi(DS)W1-3 A~CO Air,ks, inc. iS 8 Sub~idt~qr¥ O! Atl8nlJcNIcntieldCom,~,af',,! STATE OF ALASKA _.~ ALASK. )IL AND GAS CONSERVATION( VIMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~ 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-82 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20235 OTHER [] 4. Location of Well 25'E & 1581'N of SW cr Sec. 1, T10N, R15E, UM 1599'S & 1438'E of NW cr Sec. 6, T10N, R16E, UM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-10 11. Field and Pool 1579'S & 1707'E of NW cr Sec. 6, T10N, R16E,UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 28345 12. Check AppropriateBoxTolndicate NatureofNotice, Report, orOtherData Prudhoe Bay Field Prudhoe Bay Oil Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other E~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska Inc. requests permission to run a static bottomhole pressure survey on section well 9-10 in lieu of a pressure transient test for 1984. Conservation Order 165, Rule 6(d) requires an annual transient survey on one well in each governmental section producing. A static pressure survey will be run while the well is shut-in during the flow station shutdown (March 12-19) to fulfill the State's requirements. The static pressure survey should provide accurate reservoir pressure data. 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of APproval, if any: Approved by_ 61' I. OH~iE C. SMITH Approved Cop), Returned .. By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Anchorage, A, =~a 99510 · Telephone 907 277 5637. January 21, 1982 Reference' ARCO PRESSURE DATA D.S.9-3 11/20/81 D.S.3-4 11/20/81 D.S.17-6 11/15/81 D.S.3-2 11/19/81 D.S.17-1 11/15/81 D.S.9-1 11/21/81 D.S.16-16 1'1/15/81 D.S.16-1 11/14/81 D.S.4-7 12/2/81 D.S.9-8 11/15/81 D.S. 16-11 11/14/81 D.S.9-5 11/22/81 D.S.9-15 11/24/81 D.S.4-6 11/25/81 D.S.9-6 11/16/81 D.s.3-18 11/19/81 D.s.9-4 11/21/81 D.S.9-12 11/20/81 D.S.9-10 11/20/81. D.S.3-6 · 11/18/81 D.S.3-7 11/18/81 Pressure Surve'y !I 11 !1 II II 11 II I! I1 II II II !I II I1 !I DISTRIBUTION ~~'sen retUr~ sign and the attachedNORTH GEOLOGY R&D copy'as receipt of data. DRILLING PHILLIPS SOHIO MARATHON CHEVRON Mary F. Kellis North Engineering D.S.9-6' 12/9/81 D.S.9-6 1/1/81 D.S.9-17 12/10/81 D.S.9-6 12/23/81 D.S.12-9 1/4/82 D.S.12-10 1/3/82 D.S.12-12 1/2/82 D.S.12-11 1/2/82 D.S.16-9 1/8/82 Pressure Survey 11 !! I1 II Il Il 11 I! I1 EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA Transmittal #902 ARCO Alas~,a. inc. is a suo'~d,ary Of AH.~ntlcRichhe,dCom~pany ARCO Oil and Gas~mpany North Alask istric[ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer October 28, 1981 Reference: ARCO Pressure Data D.S.9-10 10/2/181 Pressure Survey ~Piease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #703 NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO Oil and Gas Company ~s a OivisiCn of Atl,JnticRichheldCompany EXXON MOBIL GETTY PHILLIPS CHEVRON A!~sb 0il & Gas Cons. 60mmissmn ARCO Oil and Gas~.ompany North Alasl, istrict Post Oflice aox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer April 29, 1981 Reference: ARCO Pressure Data ; D.S.3-5'/ 11-28/29-80 Pressure Survey D.S.9-10 11-22/23-80 Pressure Survey D.S.9-4'/ 2/16/81 '" se sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #228 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO Oil and Ga~, Company t$ a Division of AllanticR~chfieldCompany EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO O.iJ and Gas~ Company Post oftic; x 330 ,A. nct:or2.qe. ,ql.nska '5U5!0 --Pi"r)IICI:o 907 '~7-~ August 8, 1980 Reference' ARCO Pressure Surveys '/'"';.S. 3-7 ~¢"7/9/80 ID.S. 3-8'~ 7/9/80 D.S. 3-17'.6/30/80 D.S. 3-18 7/2/80 D.S. 9-1 ~'~ 4/28/80 D.S. 9-3 u"5/3/80 D.S. 9-h ~-' 5/4/80 D. Pressure Build-up " Build-up " Static " . Static " Build-up S. 9-6x 4/20/80 ! .S. 9-10/5/7/80 " " s 9-~5,,,, 5/5/8o " " S 14-7'] 5/h-5/80 Pressure Build-up k/~lease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TP&NSMITTAL #514 DISTRIBUI'I()N North Geology fLxxon R & D ~ot)J iL Drillin,2 C:ettv Eng. 5[anager Piti]lips D fi ~I Sob io Ceo 1 og}' ?!a t-a t hon State off Alaska C]~cvron ARCO Oil and Gas Corr',p3ny ,$ ~ D,v,.~,Or~ Ol .',lhl"hc &,Ch': 'J'JCO¢' p3'~y ARCO Oil and Gas Company _. Februa~T 6, 1980 ~L,.~TAT T~ Reze_ .~ncu -FILF: ............... Fm~closed is a Pressure Su~ey for ~CO D.S. 9-10 dated. '9 ~ by Gearhart-Qven. _ ~lease sign ~d retu~ the attached copy as receipt of data. K. J. Sah!strom i~o~ th Engineering TRANSMITTAL # 073 x, Anchorage, Alask~ 995"10 Teleph'~'~ 907 277 5.-53'7 August 17, 1979 Reference' Enclosed.are Pressure Surveys of the following ARCO wells: D.S. 1-6 7-9/10-79 24 El2 HP.Analysis Camco D.S. 1-7 7-4/5-79 " " " D.S. 5-13 5-15/16-79 " " " D.S.-~- -.~-_~,~. ,.,9c 4 5-12/13-79 " " " " " " Please sign/~ return the attached copy as recei?t of data. Very truly yours, R. A. Bellinger North Engineering TRiNSMITTAL # 276 ...... , ~,ll,;I/, :~ijtI DISTI~IB[fi'ION North Geology Dri 11 jng Eng. Manager R&D Geology State of Alaska ~,XXOII Hobil Getty Sohio Ha rathon Phil lips' Chevron AtlanticRichfieldCompany North Arneric~.n Producing Division Alaska i~ e;__ Post Offic~-,¢fbx 360 Anct~orage, Alaska 99510 Telephone 907 277 5637 December 15, 1978 Reference: HKVp Enclosed are copies of the following Transient Pressure Buildup Surveys: ,/D.S. #4~6: 10/2-3/78 Camco ~'D.S. #4-7 10/4-5/78 Camco ~,D.S. #4-8 10-03-78 Camco v-~.S. #4-10 10/6-7/78 Camco ~D.S. #9-3 10/12-13/78 Camco ~ D.S. #9-4 10/14-15/78 Camco ~D.S. #9-8 10/18-19/78 Camco ~ D.S, #9-10 10/16-17/78 Camco '~D.S.~#9-12 10/20-21/78 Camco wD.S. #9-15 10/22-23/78 iCamco Please sign and return the attached copy of the transmittal letter as receipt of data. Very truly yours, R.A. Logue North Operations Engineering Transmittal #615 DISTRIBUTION North Geology Drilling Eng. Manager Dallas Geology State of Alaska D & M R & D Exxon Sohio Mobil Marathon Phillips Chevron Getty ., AtlanticRichfieldCompany No;'th Ame.,' ', Producing Division Alaska Post Office ~ox 360 Anchor~ge, Alaska 99510 Telephone 907 277 5637 August 29, 1978 HKVP Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 In compliance to your request for data regarding reservoir surveillance, enclosed are copies of all initial surveys and pressure time data plus rate data per your letter of August 22, 1978. Rate Data is as follows' ~IELL TEST DATE CUMMULATIVE/BBLS RATE PER DAY 4-8 1 1/2/77 513,812 9666 5-3 01/13/78 1,244,283 8325 9-1 11/14/77 884,392 12500 9-3 11/24/77 1,066,628 10200 9-10 12/13/77 536,509 5072 . 9:12 12/21/77 436,223 6630 1-13 04/27/78 Water Well 9-3 05/4/78 478,967 8660 If any other information is needed, please do not hesitate to make the request. Very truly yours, /. --~"~ . .~ / ,/;' . .," / ..'9~ A'/. "RochOn JAR/RAL/er AtlanticRichfieldCompany ,, North American Producing Division North Alask;~--'3istrict Post Office ,( 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska Subject: DS 9-1 DS 9-2 DS 9-3 DS 9-4 DS 9-5 DS 9-6 DS 9-7 DS 9-8 99501 Permit No. 75-76 Permit No. 76-16 Permit No. 76-35 Permit No. 76-40 Permit No. 76-47 Permit No. 76-48 Permit No. 76-58 Permit No. 76-70 Permit No. 76-76 Permit No. 76-82 Dear Sir: Enclosed please find a Completion Report for the above- mentioned wells. Very truly yours, Frank M. Brown ~{~ District Drilling Engineer FMB: Ir Attachments SUBMIT I', "- ATE * STATE OF ALASKA ~1~ yLI('[ iO~rl5 OIL AND GAS CONSERVATION COMMITTEE ,.~,,~,~,, ~i,t~ s. Am NU~mCA~ COD~ 50-029-20235 i i i i i i i II IIII ii iii I WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* I I I II ~1~ la. TYPE OF WELL: OlI, ~ 6AS ~ ~ Other WELL~ WELL ~ DRY b. TYPE OF COMPLE~ON: WELl, ~ OVEg ~ rs hACK RESVR. Other Perfo 2. NaME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.0. Box 360 Anchorage, Alaska, 99510 4. LOCATION OF wELL (Re~ort location clearly and in accordance with any State requgreme~ts)* xt~ua~ 25'E a 1581'N of S~ cr Sec 1, T10N, R15E, Ar top prod. interval reported below 1599'S S 1~38'E of ~ cr Sec. 6, T10N, Ri6E, At total dep~ 1579'S a 1707'E of ~ er. Sec. 6, TiON,R16E, 76-82. 12-17.76 11-24-77 13-11-77 5-17-77) ~OW ~Y* CABI,E 12,715'~, 9076'TVD 112,628'~ 9019' TVq Single --- ~. PRODUCING !N~RVAL(S), OF ~IS CO,~P~TIO~--TO,P,BOSOM, N'A~E (MD AND ~)' ,23. WAS D!ftECTIONAL ~ SUHVEY MADE Top Sadlerochit 12,350'~, 8836'TVD Base Sadlerochit 12,578'~ 8986' TVD Yes ~ I 6. LF-ASE DF~SiGNATiON A-ND SEF~LKL NO. ADL 28345 7. iF INDIA_N, ALLOTTEE OR TIqIBE NA~IE 8. UNIT,F.A. Ila%40[~ LI~kSI~] NAME Prudhoe Bay Unit 9. WtilLL NO. 9-10 (11-6-10-16) ~0. ~-i~ ,~o POOL. Ot~ WiLp~:lhoe }ru~h_o_g__Bay Field=Oil Pool 11. SEC., T., R., IvI,~ (LIOTTOM HOLE O13.1EC~I'IV E) Sec. 6. TiON, R16E~ UM 12. PETla'VIIT NO. 24. TYPE F, LECTEIC AND OTHEI% LOGS RUN DIL,BHCS, CNL,GR/C. NL./C_CL, FDL, Induction Electric...L°g 25. CASING RECORD (Report all strings set in weld cxs~c, size20,, [ W~.I~T, L~;~'T.I[ ~R~DE !Welded IH-40 J 13-3/8" [72#-Butt- tN-80 j 9-5/8" ~47#-~utt g-80 j 6.9s, DEPTH SET (3/LD) PIOLI3 SIZE CI:;M(LNTING IIECOILD 80' ~below .id 30" t 300 sx Arcticset Cmt 2726' 17-1/~" 6400 sx Arcticset Cmt i2076; 12-1/" 1000 sx Class G Cmt A3.'[OUNT PULLED 26. LINER SIZ~ TOP (AID) [ EOTTONi (ACD) l s.~cKS CEMENT* .. 7fi= 11,759' [' ~2:708'~330sxClass' .28. PEaFOHATfONS OP~ T0 P~ODUC~O~ ([ngcrval, s?~% and numbed I 27. i-U BING REC Dill) SCiiEEqxl ~TD) SIZE [ DEPTIt Sill' (MD) ~ PAcIiER SET G 5-1/2"' il,600' "' } 11,478; 29. 'ACID, Si:OT, Fi{At~'I~R~i C~,ILNT SQU~I,]Z~, ETC. ~/A /~ ~(~ 2 i' ~ 12,379'-12,399' ".12,410'-12,425' ~12,448'-12,451' 12,456'-12,461' ' 12,477'-12,486' (~12 ,ig&' -12,503 ' '~ ~12,503' -12,528' ..... w/4 shots Per ft- , 30. PR. ODUCTION ] ?roduc].ng -kUgust 1977) I , Flowing ......... ~'-~' ' ~ ~ o _ l~,,~,~o~ 1842.6 I 624;6 I 0 i- 741 __~9-Z7 : ~ .... 4,.1 , 127 62/64 ! - PLO%V, T'USlNG FAShNG PRESSUR~ ICALC~T~ OILBBL. OAS---[~C~. ~ A%~R--~BL. lO1L GRAVITY-~I CCO~a.) jn2a I O I" > I4932 I 3656 I 0 J 27.0 ,,i. mseoSn, m~ o~ o,s (sola, u~ea/or Iu,i, vente)}"etc.) t TES'r WITNESSED BY Rein5 ected 32. LIST OF ~TTACHMENTS · 33. I hereby certify that the~oregoing and attached information is complete and correct as determined from all~av:{llable rec.rds ] / · (See Instructions and Spaces For Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases ir~ Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for' depth measure- ments given in other spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc, production from more than one interval zone (multiple completion), so state in item 20, and ir~ item 22 show the prc.ducir~9 interval, or intervals, top(';), bottom(s) and name (s) (if any) for only the interv,~l reported ir~ item 30. Submit a separate report (page) on this form, adequately identified, for each additior~al interval to be seperately produced, show- ing the acMitional data pertinent to such interval. Item26: ",Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produc~cl. (See instruction for items 20 and 22 above). ' :34. SUMMAI~.Y OF FOH. MATI'~)N T~TS IN('LUI)IN(~ INT~I~VA~ T~ST~D. PI}E~SURE DATA ~ '~COVERI~ OF OIL'. OAs. 35. GD~GIC MARK~ WAT~I AND MUD ,, , , NAr~ MEAS. D~ . . 36. CGIIE DATA. Aq'I'ACII AND DE'I~(?TEI) SIiOWS OF OI/., GAS O11 WAT~. ~ ~ , ,,,, , ,, ,.:.m;:icRichiieidCo~npany North American Producing Division ~qorth Al askP~')isi-rict Post office. ..... ..,su Anchorage, Alaska 99510 Telephone 907 277 5637 Juae 6, 1978 . Reference' Attached are copies of the following reports of Pressure Buildup Test Analysis Results' D. S. #1-4 D. S. #2-1 D. S. #3-7 D. S. #4-5 D. S. #5-11 q_ sY 6YFi2 Transmittal #353 T }', A N S ?.! ][ 'J' 'J' A Fro:it' J. A'. ]~oc]Km/P,. A. · .qtn'.-;!~ } t~ ~.:~,' herc~.:Lth are the :following for the s"':' '~,,U eot well' o . No. Scale Xerox Sep-:ia 'BL Linc Acid or Fracture .Treatment Log - B!-IP Buildup & Flow Profile Suz~,ey Boreho].a Geomet~}~ Log Carbon Oxygen Log Casing fiollar Log Cc,,,~.n u BoncI Log Compensated Neutron Log - Cased Hole Core Analysis - Interval Core No. Core Description (~x!C)- Interval Core Description (Com~.) - Core No. Directional Survgy - Gyro - S~ngle Sho~ - ~ltishot 'EngineDring Production- Log Fluid Analysis .Fluid Density . Gamma Ray Location Plat Monthly Well Test Data Nud Log Perforat~g Record . State Resm~oir Pressure Report Surveillance Reports Temperature Log ~ ~ .'fVD l,ogs -~el Induction I,aterolog - Compensated Fozmation Density Log - Compensated Neutron-Formation ~ansity Log - Bore]]ole Compensated Sonic Log - Pm'osity Log ]~ett~-~-~ ,eco~pE To Atlantic Richfield Coinpany P. O. Box 360 Anchorage, Alaska 995] North Alaska District En?;inee T RAN SM I T TA L From ' J. A. Rochon/R. A. Logue i)ate' __.~-' "~ Well Nsme' Transmitted herewith are the following for the subject well' ~/~D~/-~ Run No. Scale Xerox Acid or Fracture Treatment Log · BHP Buildup & Flow Profile Survey Borehole Geometry Log Carbon Oxygen Log Casing Collar Log Cement Bon.¢t Log Compensated Neutron Log - Cased Hole Core Analysis - Interval Core No. Core Description (SMC) - Interval -Core Description (Cony.) ~ Core No. Directional Survey- GYr5 - Single Shot -- Multishot _]__m Engineering Production Log · Fluid ?malysis Fluid Density Gan~ma Ray Location Plat Monthly Well Test Data Mud Log Perforating Record State Reservoir Pressure Report .... Surveillance Reports -Temperature Log Transient Pressure Surveys 'l\rD Logs - Duel Induction Laterolog - Compensated Formation Density Log - Compensated Neutron-Formation Density Log - Borehole Compensated Sonic Log - Porosity Log ![eceipt'Ackmowledged By:. ~-'~~.~.z/-._~. ,,~rT'~-'~r/'-~'~i'''' .... ' t'!ease Return 'Receipt To: Ms. R. /~. Logue Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 Sepia BL Line -. . North Alaska District ]~gineering TRANSMITTAL From: J. A. Rochon/D. R.. Jackson Date: March 3,1978 l';ell Name: D.S. 9-10 Transmitted herewith are the following for the subject well: No. Scale Xerox BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log . Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log' Conpensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Conv.)- Core No. DireCtional SurVey - Gyro Single Shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gamma Ray/CCL Laterolog Location Plat Microlaterolog Microlog b'Mdlog - Interval Sample Log (A.R. Co]~) - Interx/al Synergetic Log TVD-DIL TgD-Porosity Log _ 1 Induction ~lec~,r.ic~l._ Log. 2- '. Sepia [ ea.: ! ea. Receipt Acknowledged For: Date: "~ /-~/~ ff~' Attn: ?.'Ir. novan Jackson Please return receipt to: Atlantic Richfield Co. any North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 #792 DRILL SITE #9-10 PERFORATION AND CLEANUP RECORD May 14-16, 1977 D.S. #9-10 has a bottom hole location in the nort~vest cox~er, Section 6, T10N, R16E, Prudhoe Bay Field. Depths of interest: Measured Depth Subsea I)epth Zone Top of Sadlerochit Gas/Oil Contact Perforations Water/Oil Contact Base of Sadlerochit Junk Left in Hole 12350' 8782' Not Present 12537-12564' 8905-8923' SMB 12494-12528' 8877-8899' SMB/I$S 12477-12486' 8865-8871' LBS 12456-12461' 8852-8855' lBS 12448-1.2451' 8846-8849' LBS 12410-12425' 8821-8831' LBS 12379-1.2399' 8801-8814' LBS Not Present 12578' 8932' None RIH with first gun. Encountered an obstruction in the 7" liner, but was able to spud doxcn to 12565'. Ran CCL strip from 12545' to 11200'. Perforated 12547'- 12564' with choke open on 32/64". Flowed well 5 minutes with final rate, tempera- ture, and tubing pressure of 400 BOPD, 19°F, and 0 psi. RIH with second gun. and perforated 12503'-12528' with choke open on 36/64". Rate increased to 4000 BOPD with 100 psi on the tubing. Flo~md for 2-1/2 hours to clean up well. Minimum observed flow rate was 3300 BOPD. Final rate, temperature, and tubing pressure were 4000+ BOPD, 27°F, and 1000 psi. Shakeouts indicated that the CaC12 water was produced largely in a single slug with CaC12 water content of samples taken running as high as 99%. ]~e highest observed BS content was 1.0%. The final sample indicated 0.2% CaC12 water, trace BS, and 99.8% oil with 25° AP1 gravity. RIH with Fluid Density tool and located CaC12 water/oil contact at 12490' with CaC12 water/oil emulsion present up to 12092'. The CCL run with ~e Fluid Density log failed so we tagged bottom to establish depth after running the survey. RIH with third gun and encountered an obstruction at 12528'. Spudded on down. Perforated 12537'-12547' and 12494'-12503' with a select fire gun, flowing on 48/64" choke. Flowing tubing pressure was 750 psi and there was no visible increase within 15 minutes after perforating. Both guns fired correctly. RIH with fourth gun (select fire) and perforated 12456'-12461' and 12477'-12486' while flowing on 36/64" choke at 980 psi tubing pressure. There was no visible tubing pressure increase within 5 minutes after perforating. Both guns fired correctly. D.S. #9-10 Perforation and Cleanup Record Page 2 RIH with fifth gun (select fire) and perforated 12448'-12451' and 12410'-12425' while flowing on 36/64" choke at 900 psi. Again, there was no visible tubing pressure increase within 5 minutes after perforating. Both guns fired correctly. RIH with sixth gun and perforated 12379'-12399' while flowing on 36/64" choke at 900 psi. Saw 100 psi tubing pressure increase in the next 5 minutes. RIH with dual Amerada pressure Bombs making static stops near bottom. Flowed well for 145 minutes on 48/64" choke. Final flowing tubing pressure, temperature, and the average rate were 1060 psi, 40°F, and 5928 BOPD. SI well for 2-1/2 hour buildup, recovered Amerada bombs, and determined that the pressure at 8800'ss was 4378 psi, and the maximum drawdownwhile flowing was 577 psi, giving us an .approximate Productivity Index of 10.3 STB/psi.' ~e maximum bottom hole tempera- ture thermometer broke. The total volumes of oil and gas produced during the perforating operations are estimated at 840 bbls. oil and 672 MCF gas. PDL 6/3/77 North Alaska District Fmgineering TRANSMITTAL To' From' I)ate: 9- 8 ~ 7 7 Well Name' D.S. 9-10 Transmitted herewith are the following for the subject well' Run No. - .. · . BHC Sonic/caliper Log ---. BHC Sonic/Caliper - Garmna Ray Log ~ BHC S°nic/Gamn~a Ray Log Caliper/CCL_~ -- - ' Cement Bond. Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot ~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gmr~na Ray/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Intexnzal Sample Log (A.R. Co~) - Interval _ Synergetic Log TFD-DIL TVD-Porosity Log Casing Collar Log Scale _ .. ~OrOX Sepia BL Line ]ea Receipt Acknowledged For: Date' 7- ~Z ~ '77 Please return receipt to: Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 By' #579 Nor th A_l_a~;t:.a Dis t T R A N S M ~[ T T.A L J. A. P, ocl~on/l), ti. Jac'k~;on re' June 24, 1977 lfell Name' D.S. #9-10 ansmitted 'herewith are the :following for the subject well.' '~. No. Scale Xerox Sepia BL I, ine BHC Sonic/Caliper Log BI-'IC Son.~.c/Cal~t e~ - Gamma Ray Log BHC Sonic/Ga..~a R~-~.y Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron~Fomm_tion Densit7 Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) ~ Interval Core Description (Cony.) ~ Core D:i. rectional Survey -- [-~ro Sing].e Shot I)ri]l Stem Test - Test No. D~ml Induction Lsterolog Formaition Density 1,og FOrmation ~ s''-~' D,n.. _it): Log/Gamma Ray Gamma Rsy/CCL I, aterolog Loca t..[on .P1 ar M:icrolaterolog Mudlog- Interval Saml)lC Log (A. R. C~ -- Synerget:i.c I,og TVD-DIL TVD-Porosity Log Fluid Densitg .. , -:. [. :e:ipt Acknowie~lg'ed For: ase return receipt to' .. l¢iclifield Company ~Noz.'th A].as;ka I';ng:ineer:lng Manager P. O. Box 360 #500 Post Offic,. jx Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural .Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-3 (31-11-10-15) Permit No. 76-35 Drill Site 9-4 (13- 2-10-15) Permit No. 76-40 Drill Site 9-.5 (31- 3-10-15) Permit No. 76-47 Drill Site 9-6 (13- 1-10-15) Permit No. 76-48 Drill Site 9-7 (31- 2-10-15) Permit No. 76-58 Drill Site 9-8 (33-36-11-15) Permit No~ 76-70 Drill ~qif_p 9-9--.J31- 2-10-15) Permit No. 76-76 ~--D-~~I 6-10-16) Permit No. 76-82 Dear Si r: ~ - I..?- 77 Enclosed please find our Sundry Notices of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb Enclosures Fo~m 1 0-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) O,L I'-Jl GAS I---I WELLm Am WELLm m OTHER 2. NAME OF OPERATOR Atlantic Richfield COmpany 3. ADDRESS OF OPERATOR P. 0. Box 360 Anchorage, Alaska 4. LOCATION OF WELL 99510 5. APl NUMERICAL CODE 50-029-20235 i6. LEASE DESIGNATION AND SERIAL NO. ADL 28345 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. Drill Site 9-10 (11-6-10-15) 10. FIELD AND POOL, OR WILDCAT At surface 25' E & 1581' N of SW cr Sec. l, T10N, R15E~ UM 13, ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB Prudhoe Bay Fi eld-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 6 T10N, R16E, UM 12. PERMIT NO. 76-82 14. CheCk Appropriate Box To Indicate Nature of Notice, Re ~ort, or Other Data NOTICE OF INTENTION TO: PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) Perforate (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Began perf operations @ 0600 hrs on 5/10/77. Tstd tree, csg, tbg & wireline BOP's. Pulled dummy valve. Perf'd intervals 12,545'-12,562', 12,501 '-12,526' w/4 shots per ft. Ran FDL, found oil/wtr contact @ 12,082'.,Perf'd intervals 12,535'-12,546', 12,492'-12,501' 12,477'-12,486' 12,455'-12,460' 12 447' 12,450', 12,408'-12,423' 12,377'-12,397' w/4 shots per'ft. Ran Amerada press bombS. Flowed well for ~ 2 hr. SI well. Ran & set ball valve @ 2189'. Tstd balance & control lines to 5000 psi OK. Bled press above ball valve to 0 psi, held OK. Released well to Production Department @ 0300' hrs on 5/17/77. )-,, 16. I hereby certify that the foregoing is true and correct TITLE District Drilling Engineer DATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side STATE of ALASKA DEP~ OF ~-~%t~AL RESOORL~ Division of Oil and Gas Conservation TO: FROM: Hoyle Il. l~mil~' I. ramie C. ~lith ._..-~1~. b Chief Petrole%~ EngL~eer Petrole~ /_c~ · DATE : SUBJECT: 25, 1977 TO Y~,zitness Tests cn Surface C~xtrol &%fety Valve and ~ace Safety Valve for Arco, Dri]~ Site 9-10 ~, ?~y 17~, ~77 - 12:45 N,! 3Kirk V]--~ite pimked ne ~ at [~ill Si~ 5 ~ t~c ~ to t~ill~ Si~ 9-10 ~ ~ess a m~f~ ~~ol ~fe~f valve ~ ~~a~ ~~ ~~ ~. r~ ~~ is a ~s~ for ~. ~e ~ ~ ~ 9-10 w~ ~ ~ I ~i~. ~e ~~ clo~ ~ t~ pres~ of 1500 psi ~s bl~ ~ to 500 ~ ~. I ~~ ~s f~ 10 ~-~~s. ~e~ ~~1~ of pms~. ~ ~%~ ~ ~ S~ ~ cto~ ~ w~ bl~ r~ ~ SS~ f~ 1500 ~i to 500 psi. ~~ ~ for 15 ro~u~. ~~ ~ 1~ ~i~ of ~es~e, ~t ~ ~ $~~ ~~d ~ 1~. ~s~ ~1~ at 2-15 ~. ~t at 2187'. ' sazety %~alve on drmll state 9-10 for Arco. Tests %~re satisfactory. Attach~lt .Drlg. Permit Operator :a (", and Gas Conservation Comm _~e ( eld Inspection Report Wel 1/Platfm Sec T R ,_o _~ presented by/~'/.~f/~~ ......,' '~ ~_ ~/#/,.~ Name & Number .~St .~7-~]~ ..... Satisfactory Yes No ~: (]) ( )' ~ Well Sign '() () ( ) ( ) 3. Reserve Pit-( () ( ) ~4, Rig Locati on ~ Genera I () () () () () () () () )filled ;ts 6 :S ubs'ur'faCe:No', 'Well s ./ ( )Well Test Data 7. Well Nos. , , 8. Hrs..obser , __,~ 9. BS&W , , , 10. Gr. Bbls. ( )ca:Ppe:d(.':' ) ( ) ( ): !3. C (.) . ~( ) led Total insPection' 'observation ti Sati s l:actory Type Inspection Yes No Item ( ) BOPE Tests () () () () () () () () I ) () ) () () () ( () () () () () () () () 15. "Casing set @ 16. Test f'iuid-( )wtr.---~--~ )mud. (-) oil 17. Master Hyd. C6ntrol Sys.-~_psig 18. N2 btls. , , , psi_q 19. R~mote Contr°~ 20. Driiling spool' "outlets 21.'Kill Line-( ) Check Valve 22. Choke Flowline ( ) HCR valVe 23. Choke Manifold No. val.vs flas 24. Chokes-( )Remote( )Pos.(,)-A-dj] 25. Test Plug-( )Wellhd( )csg( )none 26. Annular Preventer, psig 27. Blind Rams,.psig ..F Rams ~ psig Ily& Kelly,'cock ps:i g' Ive TRAN SN I TTAL DIST~ STATE Ci.F ALASKA 'DIVISION. OF OIL blay 16, 1977. ~TO~: · . T~ransmizted herev~_~ are ihe £01lo:~ing for the stfoject well- o o . ~HC S6nic/C~ ~t~r ~og - BHC Sonic/C~!i?ar ' G~a Ray. '>- - ~HC ~c/G~ Ray. Log . . -..'- C~er/C~ - . . C~ent Bon~ Lp~L ' ...... Cp~~a cea Neutron-Yo--Yos- Core _~_~ys~ - lnte~ ' . . Core Des~iption CConv.) - C~ze. lfo. Sao~ .. '- .. S~gle ' t,~tishot . ~~ St~'Test - Test No. ~ ~~ Induc~o~ ~o~ation Da~i~ . ~~o~ De~i~ Lo~Ga~i Ray LateroZog ' ~" Lo~tion Plat. . ],~ol~te~!og' .. ~,~~1o~. '" S~le Loz .Syvezgetic Log - -RR~D-DIL ~,qO-Porosi ~/Log .. J. A. Ro~hon/p. D.S. #9-10' Xez. mc o. '::Receipt Actmowiedged For: Date: }']case return receipt to' · At!~tic Rid~field Co.,.-m~ny North Alaska Engineering P. O. Box 350 ;: " .... '"~ A ["-: .- . #365 · AtlanticRichfieidCompany North Amer~r~ Producing Division North Alask. ~istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 April 14, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-10 (11-6-10-16) Permit No. 76-82 Dear Sir' Enclosed please find a Completion Report along with the Drilling History, Single Shot and Multi-Shot Directional Surveys for the above mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure DS 9-10 DRILLING HISTORY API# 50-029-20235 ADL 28345 PERMIT NO. 76-82 Spudded well @ 0600 hrs 12-17-76. Drld to 921'. Circ broke around outside of 20" conductor. Cmtd w/170 sx cmt. CO 10' cmt inside 20". Drld 17½" hole to 1200'. No returns outside 20". Drld 17½" hold to 2750'. Ran 13- 3/8" 72# N-80 butt csg w/shoe @ 2726', collar @ 2648'. Cmtd 13-3/8" csg w/6400 sx Arcticset cmt mixed w/0.3% D13R, slurry wt 15.2 ppg. Floats held OK. ND 20" Hydril. Installed & press tstd csg spool & pkoff to 2000 psi. NU & press tstd BOPE. Drld FC, cmt, & float shoe @ 2726' Drld 10' new form, press tstd form to 500 psi OK. Drld 12¼" hole to ~800'. PU Turbo Drill & drld to 3115'. PU BHA & drld 12¼" hole to 12,135' Ran DIL/SP log. RIH & drld 12¼" hole to 12,155'. Unable to pull wear bushing. PU 13-3/8" spear. Engaged bushing but could not pull. Set Baker Model C retrievable BP @ 1000'. Removed & replaced 20" x 13-3/8" head. NU & press tstd. Retrieved Baker BP. RIH breaking circ @ 6000', 9000', & 12,000'. Stuck pipe @ 12,130'. Pulled free. Reamed & CO to 12,095'. Cond hole for csg. Ran 9-5/8" 47# butt csg w/shoe @ 12,076', FC @ 11,994', lower FO @ 2459', upper FO @ 2333'. Cmtd w/lO00 sx Class G cmt mixed with 0.75% D65 & 0.2% D13. Slurry 15.8 ppg. Bumped plug w/3000 psi. Float held OK. Installed & press tstd csg pkoff. Press tstd BOPE. Opened lower FO. Cmtd w/300 sx Arcticset cmt mixed w/0.4% D13 & 0.4% D46. Slurry 15.4 ppg. Closed & press tstd FO to 3000 psi. Opened upper FO. Circ 9-5/8" x 13-3/8" anul. Pumped 50 bbls prepack followed by 231 bbls gelled Arctic Pack. Break thru @ 165 bbls. Zero % wtr contamination after 70 bbls returns. Closed & press tstd FO to 3000 psi. Drld FC, cmt & float shoe & new hole to 12,168'. Press tstd form 11.3 ppg equiv mud weight. Drld 8½" hole i~o 12,715'. Ran DIL. CO to 12,715'. .Ran 7" 29# MN-80 butt lnr w/shoe @ 12,708', top of lnr 11 759'. Cmtd w~/_~330 sx Class G cmt mixed w/0.35% D13 & 0.75% D65. Displ w/247 ~bls. Bumped plug w/3000 psi. No flow back. RIH & drld cmt 12,511' - 12,628'. Press tstd 7" lnr lap. Pumped 1½" bbls/min @ 2550 psi. RIH & set pkr @ 11,560'. Squeezed w/lO0 sx Class G cmt mixed w/0.2% D13R & 0.75% D65, slurry 15.8 ppg. Max. press 3200 psi, final press 2600 psi. RIH & CO cmt from 11,556'-11,759'. Press tst csg 30_~P])__p~i. No bleed off. CO cmt 11,759'- 11,789'. Tstd csg to 3200 psi OK. Chgd to 5" rams. Tstd BOP, manifold & Hydril OK. Press tstd csg & lnr lap 3000 psi OK. RIH w/DST tools. RIH w/7000' wtr cushion Set pkr @ 11,707'. Opened tools for 3 hr flow tst, lite blow, dead in ~ hr. Closed tools for 1 hr shut-in. Charts indicated small leak. Set EZ drill at 11,660'. Sg__~.~u~e~_z.~.~..w_~.7~.sx cmt. Drld out EZ drill. Tstd lnr & csg to 3000 psi OK. Tstd anul & 7" lnr to 3000 psi. PU DST w/6975' wtr cushion. Set pkr @ 11,640'. Very weak blow decreasing to no blow in I hr. RECEIVED APR 1 !S 1977 DS 9-10 DRILLING HIST~-' (continued) API #5C--'!9-20235 ADL 283~o Permit No. 76-82 Displ & cond calcium chloride wtr. Made up DST tools, RIH & set pkr @ 11,619' w/ 8400' wtr cushion. Opened tools for 2 hr flow tst. Very lite blow, dead after 15 min. Shut in for 2 hr tst. POH. Charts indicated tst no good. Made up RTTS tool, RIH & set pkr @ 11,618'. Broke down & pumped into formation @ 1½ bbl/min rate. At 5000 psi shut in pressure bled to 3050 psi in 5 min. Pulled up, set RTTS tool @ 11,500'. Squeezed w/50 sx preceded by 10 bbls wtr & followed by 10 bbls. Disp cmt 'to form @ 5000 psi @ ½ bbl/min rate. Held 4400# against form for 5 hrs. Released pkr. POH. RIH w/9-5/8" csg scraper & washed cmt stringers from 11,546' to 11,669'. POH. RIH w/7" csg scraper to 12,628'. Press tstd csg to 3000 psi OK. RIH w/DST tools. Set pkr @ 11,619'. Open tools for 2 hr flowing tst.. Very lite blow increasing to strong blow in 15 min, dead after I hr and 45 min. Close tools for 2 hr shut-in. Unseated pkr & POH. Fluid rise 150'. Charts indicated form leak thru lnr lap. RU & press tstd lubricator. RIH & perf'd 4 holes/ft 12,056' - 12,058' Ran EZ Drill retainer on 5" DP. Set retainer @ 11,520'. Press anul w/~200 psi. Broke down form @ 3200 & pumped @ various rates, 1-2 bbls/min. Mixed 350 sx preceded by 10 bbls wtr, followed by 10 bbls wtr & displ w/est 18 bbls of cmt (90 sx) to form. Final displ press 4500 psi. Bled to 3250 & held for 10 min. PO EZ Drill & rev out excess cmt. POH, LD cmtg tools, PU 8½" bit. RIH. Circ & cond mud @ 11,400'. E-Z Drill retainer set @ 11,505'. As of February 28, 1977, drld retainer & cmt to 11,670'. Drld firm cmt 11,670' - 11,795'. Tstd lap w/3000 psi OK. Drld soft cmt 11,795' - 11,953'. CO from 11,953' to 12,058'. RIH & set pkr @ 11,480'. Form broke down @ 4250 psi. RIH & set EZ drill 11,480'. Broke down form @ 3200 psi. Pulled out of EZ Drill' mixed 350 sx cmt, pumped 10 bbls wtr ahead & 10 more bbls wtr behind. Stabbed into EZ Drill, press anul to 2000 psi. Displ cmt w/final squeeze pressure 4300 psi, bled back to 3000 psi. Pulled out of EZ Drill, rev out & rec 6 bbls contaminated cmt & fresh wtr. Est 230 sx to form. RIH & drld EZ Drill retainer & hard cmt to 11,800'. Tstd lnr lap to 3000 psi OK. Continued drlg cmt to 12,068'. Cleaned out to PBD 12,615. Tested csg 3000 psi. OK. WIH with DST tools to 11,477. Ran 6,050' water cushion. Open tool for 2 hr flow test. Closed tool for 2 hr. shut in test. POH. Net rise 60'. Charts indicated leak. Trip in hole w/8½" bit and 9- 5/8" casing scraper to 10,670' POH. Picked up 6" bit and 7" csg scraper. RIH to 12,615'. POH. Reran DST tool setting pkr at 11,779'. Ran 6,050' water cushion. Open tool for 2 hrs. Light blow for 9 minutes then dead. Close tool for 2 hrs shut in test. POH. Net gain 55' rise. Charts indicated minor leak. RIH w/6" bit and 7" casing scraper. Circ. at 12,615' POH laying down drill pipe. Installed 5½" BOPE rams. Ran wireline junk ba~ket and gage ring. Ran 5½" 17#/ft MN-80 LT&C A-B Modified tubing with Baker SAB pkr at 11,478' and ball valve nipple at 2189'. Landed tubing and pressure tested tubing hanger to 5000 psi~K. ~s~-ed tubing with diesel thru sliding sleeve. Closed sleeve. Dropped ball and set pkr. Pressure tstd tubing and tubing annulus OK. Nippled down BOPE. RU & pressure tstd Christmas tree. RIH and retrieved dummy ball valve. Ran GR/CNL/CCL logs and dummy gun. Reran & set dummy valve. Pressure test tubing and tubing annulus for long term test. Released rig @ 0600 hrs 3-11-77. Sheet 2 of 2 RECEIVED APl?. I bMSion o~ O~ a¥'~o' ~h~s STATE OF ALASKA sUBMIT IN OIL AND GAS CONSERVATION COMMITTEE ,~J~;e ()thor st ructions on revel'se side,, WELL COMPLETION OR RECOMPLETION REPORT AND LOG* W ELL 1¥ ELL DR ¥ Other b. TYPE OF' COMPLETION: WELl. OVER EN BACK RESVR. Other 2. NAME OF OPERATOR Atlantic Richfield Company 3, ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4. LOC^TION 0¥ WELL (Report location clearly and in accordance with any State requirements)* .it surface 2~5~',o E ~d ]~gg,,l~', N of ~wcr Sec 1,T10N,R15E,UM rep0r~ed 159~P'~ ~ 1438'E of NN ct. Sec. 6, T10N,R16[,UM it total dep~ 1579' S & 1707' E of N~ ct. Sec. 6, T10N,R16E,UM 5. API NUMEIUCAL CODE 50-029-20235 6, LEASE DF-.SIGNATION A_ND SERIJkL NO. ADL 28345 7. IF IND1A_N, A~L, LOTTEE Oi~ TI{IBE NA_NIE Prudhoe Bay-Sadl erochit 11. SEC., T., R., I~I., (BOTTOM HOLE Okld IgC'I'IVE) Sec. 6, TION,R16E,UM 12. PEPoh, IIT NO, 76-82 ~TC)* ~17. RKB, GR, ELEV. CASINGttEAD 12/17/76 ] 1/24/77 [ 3/11/77 [21' Paa Elevation (Grave?) I~. TOTAL DEPTH, ~LD & TVD[19. PLUG; BACK MD & TVD~0, I.F MULTIPLE COIVi_PL., [ 21. ;NTERVA! S I)R'[L[ ED Itt' I I I I~OW 1Vi~k2~Y* ROTARY TOOl 12,715 MD,9076 TVD· [ 12,628 MD. [ qqnalp [ " I ' ' 22. PRODUCING !NT~HVAL(S), OF THIS CO,MPI2ETION--TO~P, BOTTOI~,' ~1~I~ (MD AND ! S U 11 Vi'fY M ADI~; Top Sad]erochit 12,350'MD, 8836'1¥D ! Yes Base Sadlerochit 12,578'MD, 8986'TVD 24. TYPE ELECTRIC AND OTHEYt, LOGS RUN P14SP ! CASING RECORD (Report all strings set in well) 20" welded[ H-40 I 80' 30" I 300 sx Arcticset Cmt .. 13-3/8" 72#-Butt ! N-80 ~ 2726' 17~" ~ 6400sx Arcticset Cmt q-5/a" 47#,Butt tIMN-80 I~ 12.076' 12~" lO00sx Class G Cmt · ' soo. 95I' - I I 26. .LINER l~COt~kl) [ L [ 27. IruIBING S!Z]~] [ TOP (2JD)[ ISOTTOi~/f (R~ID)I S~_CKSCERiE.N-Tq SCi~EE2NT (i~:D, SIZE DEPTI-I SET (.MD , . ll.aoo 28. PEi~FORATiONS OPFXN TO PRODUCq~IOlhI (interval, size and number) 29. ~ PACIiEI[ SET ,[ 11 ~478' NA PRODUCTION ACID, Si!OT, D~TIi 17¢2'~V.~ (MD) [ AM(~UN~ AND I'L!ND Ol,' MA.'iE/IIAL USED OCCE VED 30, DATE FIRST PftODUCTIONJ I PP. ODUCTION MEI[{OD (Flowii}g, gas lif~, pumping--size and NA F~ow, TUBING ~ P~ESS~ ~OALO~T~ OI~BBL. GAS--MCF. WA~BBL. ~O1L GI~.AVITY-~I (CO.g.) I~SS. . [2d-HOUr. RA~ L -.. ; ,. l 1 31. ~mPosmuoh' or s,s (Sold, u~ed 7or 7uel, vented, etc.) Drilling History, Single Shot and multi-shotsurveys ]TEST ! BY ~2. LIST O~ ll'TACHMENT8 hereby certify that the foregoing and attached information is complete and correct as determiued from all-available r,c.rd *(See Instructions and Spaces Jar Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise sho'wl~) for depth 'measure- ments given in cther spaces on this form and in any att,~chments. Items 20, and 22:: If this well is completed for separate production from more tha~ one i~terval zone (multiple completion), so st¢~te ~n iter~ 20. and il~ ite-~ ?? show thc~ F,c:t~cir~..q intcrv~'~l, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval ref~orted ir~ ite~ 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be seperately produceJ, show- ing the additional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). "34. SUMM'AI{y OF '~bi'~MATION TESTS IN('L. UI)IN(; IN'I'E[iVkL TESTEr). mtEsSUrtE DA'I'& AN']) .F~COVEP, IES OF' OII~"i' GAS. 35, G I~X)L,OG IC M A. B K I~P~ WATE/~ AND MUD ,, , A'N~" I)~'P~Cq*EI) NIIOWS O~ OIL. GAS OR WAT~{ ..... ..... , , ,,., .,. ,, , · ,,,a,, ,. , ,., ...... ,, ~ ,.,- , . ...... , , r Eastman/ ~ Whipstock l)~ A PETROI.ANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY Atlantic Rich£ield COMPANY Do S. 9-1~ WELL NAME Prudhoe LOCATION JOB NUMBER TYPE OF SURVEY A377 D0307 Single shot DATE 3-23-77 SURVEY BY A1 Cheek OFFICE Alaska COMPLETION REPORT ~MARCH 22,i977 ATLANTIC RICHFIELD CO. [)RILL 5ITE 9-10 MAGNETIC SINGLE SHOT SURVEY DECLINATION 31 DEGREES EAST RADIUS OF CURVATURE METHOD OF COMPUTATIONS K B ELEV. 5~+ FT. COr~PLJTED FOR EASTMAN WHIPSTOCK INC, BY F, ;.1, LIN[PSEY ANO ASSOCIATES RECORD OF SURVEY ALL CALCULATIONS PERFOIW. HED BY I J i~ ELECTRONIC COfv}PuTER TRUE MEAS. DRIFT VERTICAL DEPTH ANGLE DEPTH D SUB DRIFT SEA DIRgC DEG, TOTAL COORD :INATES CLOSURES ~TA~rc ..-, ~,~.. ~- ANGL~ D M S DOG LEG SEVERITY DEG/tOOFT S~CT!ON DISTANCE THE FOLLOWING ARE MAGNE'1"IC HULTISHOT SURVEYS 0 0 0 0.00 140 0 30 139.99 231 0 15 230,99 322 0 0 32i.99 413 0 0 412.99 504 0 7 503.99 595 0 7 594.~9 686 O 15 685.99 '77 0 15 776.99 868 0 0 867.99 959 0 25 958.99 io5o i o 1049.98 -54.00 N59.00W 1528.00 N 85.99 N59.00W 1~28.31 N 176.99 N~9.00W 1528.62 N 267.99 N59.OOW 1928,72 N 358.99 N59.00W 1~28.72 N 449.99 $ 7-OOE 1528.67 N 540.99 S24.00E 1528.48 N 631.99 S24,00E 1528,20 N 722.99 S24.00E 1527.84 N 813,99 S24-00E 15~7.66 N 904.99 S29.00E 1527.36 N 995,98 $40,OOE 1526,~2 N 1141 1 5 11a0.97 1086.97 S69.OOE 1525.46 1232 t 15 12~1,95 i177.95 $80.50E 152a.98 1323 1 13 1322.93 1268.93 $72.50E 1524.52 141~ 0 25 1413.92 1359.92 $72.50E 1524.13 i505 0 5 1504.91 1450e91 $61.75E 1523.97 1596 0 20 1595.9i 15~-1.gl 581.50E 1523.86 1687 0 30 1686.91 1632.91 S16.00E 152B.~5 1781 0 37 1780.91 1726.91 $13.00W 1522.53 1875 ! 1'5 t874.89 1820.89 $15.50W i521.04 1969 ! 45 1968.86 1914.86 $30.50W 1518.78 698.00 E 697,47 E 696.96 E 696.79 E 696.79 E 696.72 E 696.78 E 696.90 E 697.06 E 697.14 g 697.29 E 697.93 E 699.28 E 701.06 E 702.97 E 704.2i E '70a, 58 E 704.9t E 705.38 E 705.al E 705,03 E 704.07 E 167W.87 N 24 33 4 5 1679.94 N 24 31 49 E 1680.01 N 24 30 37 E i680.03 N 24 30 12 E 1680.03 N 24 ~O i2 E 1679.96 N 24 ~0 7 E 1679.80 N 24 ~0 2~ E 1679.34 N 24 ~1 28 E £679.21 N 24 31 ~6 E i679.00 N 24 ~2 18 E 1678.42 N 24 34 17 E 1678.10 N 24 37 ~6 i 1678.79 N 24 45 ~7 E %678,97 N 24 48 ~6 E t679,01 N 24 49 27 E t678,83 N 24 50 42 E 1678,01 N 2~ 51 32 E i6'76.49 N 2~ b2 7 E 1674.04 N 24 52 16 ~ 0,000 0.35'7 0.275 0.2'7~ 0,000 0.143 0,042 0.132 0,000 0 °275 0.462 0,648 0.089 0,17~ 0,033 0,879 0.363 0,275 0.176 0.138 0.660 0.532 1325.76 i325.13 1325.03 1325.03 i32~.95 1324.90 1324.88 1324.86 1~2~,85 ~324.84 1~24.98 1325,73 i327.09 1328.56 1~£9.48 i329e74 i329.98 1330,21 1329,80 1328,77 1326.88 RECORO UF ,SURVEY ALL CALCULATIONS PEmt'~,., .',~D F,y i B r..,; ELECTRONIC CO,'"IPUT~:~ TRUE DRIFT VERTICAL A~',~GL E DEPTH SUB DR I FT SEA DIREC DE~- TOTAL COORC'[rNATES ,..063 1 27 2062,R2 2OO8,R2 $29,50W 1516,50 N 2157 0 52 2156,80 2102,80 S36,00W 1514,fl8 2251 0 50 2250,79 2~96.79 S3B,50W 151B,76 23a5 0 37 23~4.79 2290.79 S28.00E 1512.63 2a39 0 aP_ =?a~8~ .78 2384.78 539.50E 151i.'/1 N 25B3 0 ~7 25~.77 Z47~.77 Sla. OOW 1510.68 2627 0 33 2626.77 2572.77 $29.25E 1509.74 2670 1 0 2669.76 2615.76 $44.00E 1509.28 702.75 E 701.71 E '700.88 E '701.36 E 70i.60 E 701.72 E 7(32 · 07 E A,.~P~ETIC SI GLE SHOT SURVEYS THE ~OLLOWING ARE M '" ~ F! 2379 ~ 0 2878.54 2824.54 N57.00g 1508.33 2941 6 30 29a0.28 2886.28 N33.00E 1512.B1 3004 9 0 3002.70 2948.70 N41.OOE 1519.09 3035 10 15 3033.26 2979.26 NSI.OOE 1522.68 ~065 11 15 3062.73 3008.73 N54.00E 1526.09 .89 15 15 3280.72 3226.'72 NDg.00E 1554.41 3600 20 0 3577.0~ 3523.0~ ii66.00E 1597.85 3915 25 15 3867.70 3813.70 N&8.00E 1645.18 710.43 E 714.41 E 719.52 E 723.2~ E 727.68 E 7'70.4-7 E 853.92 E 4224 31 45 4139.11 4085.11 N68.00E t700.b9 N 1102.05 4629 38 30 ~470.16 4416.16 NTI.OOE 1781.93 N 1320.17 5063 50 0 ~780.52 4726.52 N'72.0OE ]877.87 N 1606.87 5280 57 0 4909.51 4855,51 ~70,OOE 1934.62 N !771.70 5944 58 30 5263.82 5209.82 N67.0OE 2140.40 N 2294.11 6128 58 30 5359.96 530~.96 N66.00E 2202.96 N 2437.98 7036 57 45 5839.45 5785.45 N66.00E 2516.58 N 3142.39 7775 56 30 6240.57 6186.57 N70.50E 2746.~1N 37t8.70 8381 54 30 6583.80 6529.80 N70.OOE 2915.26 N 4188.72 9037 56 15 6956.52 6902.52 N70.OOE 3099.88 N 4695.96 CLOSURES STANCE ANGLE D ~4 t671.4i N 24 51 ~7 E 1669.51 N 24 51 15 E 1668.14 N 24 50 37 E ~667.06 N 2~ 51 25 E 1666.49 iq 24 53 21 E 1665.65 N 24 5~ 41 E 1664.86 N 24 55 44 ~ 1664.98 N 24 56 4'~ E 1667.26 N 25 13 14 E 1672.56 N 25 17 9 E 1680.87 N 25 20 gO E i685.72 N 25 24 24 E 1690.70 N 25 29 $5 ~ 173~.88 N 26 2i 58 ~ 1~11.72 N 28 7 15 E 1907.53 N 30 24 18 E 2026.29 N 32 55 ~3 E 2217.69 N 36 ~2 0 E 2~7i.52 N 40 33 12 E 2623.29 N 42 28 58 E ~137.56 N ~6 59 6 E 32~u.85 N 47 53 ~6 E 4025.89 N 51 18 ~7 E ~622.99 N 53 33 5 E 5103.3g N 55 9 46 E 5626.8% N 56 3~ 13 E DOG LEG SEVERITY DEG/IOOFT 0.309 0.617 u 0.224 0,085 0,08~ 0.085 1.047 1.44'7 4.063 3.980 4.160 3.355 1.792 i.550 1.671 2.104 1.691 2,65~ 3~290 0.399 0,463 0.083 0.456 0.267 SECTION DISTANCE i322.99 1321.72 1321.10 132i,22 1320.95 1320'62 132©,71 1327,68 1333.05 13~0 · 72 134'5,68 1351,20 1402,2.3 14'96.31 1.617 · 05 1763.73 1994.83 2293,38 3024.11 3180.60 3950.18 4567,47 5062.24 ALL RECORD OF SURVEY CALCULATIONS PERFORiV, ED BY i B ,',i ELECTRONIC CO~v;PUTER TRUE MEAS, DRIFT VERTICAL SUB DRIFT TOTAL COORUINATES ~EPT~ ANGLE DEPTH SEA DIREC D M DEC, ~581 56 0 7259,74 7205,74 N69,00E 3258,05 N 5119.01 E 10322 55 0 7679,~4 7625,44 NTO.50E 3469.41 N 5691.92 E 10828 55 30 7967,86 79!3,86 N72,00E 3603,04 fi 6085,59 E 1113~ 56 0 8142,33 8088.33 N72,()OE 3682.23 N 5329.29 E 11313 56 i5 82'39,87 8i85.87 N73,00E 3725,92 N 6467,86 E 11845 55 45 ~537.36 8483,36 N73.00E 385~.87 N 6889.6~ E 12083 54 0 8674.29 8620.29 NSO,OOE 3900,28 N 7078.79 E 12155 53 15 8716,99 8662.99 N82.00E 3909.35 N 7136,05 E THE FOLLOWING ARE MAGNETIC MULTISHOT SURVEYS 12177 52 15 8730.31 8676,31 N80,5OE 3912,01 N 7153.35 E 12270 51 0 3788.04 8734,04 N84.50E 3921.53 N 7225,62 E 12363 49 30 8847.~1 8'793,51 N86,00E 39~7,45 N 7296,88 E 12456 49 0 9908.21 8854.21 N86,0OE 3932,36 N 7367.16 E 12549 +9 0 8969.23 8915.23 N85,00E 39~7.8'7 N 7437,13 E ~ 90 48 45 8996.19 8942.19 N86.00E 3940.29 N 7467,92 E 126~5 48 30 9058.99 9004.99 N86.00E 3945.26 N 7539.03 E 12715 g8 25 9078.88 9024.88 N86.00E 3946.83 N 7561.43 E CLOSURES DISTANCE ANGLE D N 6067.38 N 57 ~1 29 E ~665,9A N 53 38 10 E 7072,23 N 59 22 18 E 7322,49 N 59 48 36 E '?~6~,30 N 60 3 18 E 7894,75 N 60 46 20 E 8082.17 N 51 8 45 E 8136.'F2 N 61 17 4 ~ 8153,18 N bl 19 36 E 8221.19 N &l ~0 36 E 8286.69 N ~1 42 33 E 8350.96 N 61 5~ 29 E 8415,33 N 62 5 57 E 8443.~8 N 62 10 5'7 E ~508.94 N 62 22 35 E 8529.52 N 62 26 12 E DOG LEG SEVERITY DEG/i©OFT 0,134 0,191 0,224 0,161 0.420 2,065 ~,231 2,925 1.863 0,538 0,812 1.508 0.26B 0,267 SECTION DISTANCI 5045,57 6651.25 7052.09 7314.77 7~57.83 7891.41 8080.11 8135,07 8151.64 8220,I1 828~*02 8350,60 8'15.18 8443,59 8508.94 8529.52 BOTTOM HOLE CLOSURE 8529.52 FEET AT N 62 26 12 E ~EASURED DEPTH ANE) OTHER DATA FOR EVERY EVEN 100 FEET OF SUB ,SEA DEPTH. TRUE ~.SURED VERTICAL SUB MD-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORD [NATES 15& 154. 100 0 0 254 254. 200 0 0 354 354. 300 0 0 454 ~54. 400 0 0 554 55~. 500 0 0 654 654. 600 0 0 754 754. 700 0 0 854 854. 800 0 0 954 954e 900 0 0 1054 1054. 1000 0 0 1154 1154. 1100 0 0 1254 1254, 1200 0 1354 1354. 1300 0 O 1454 1454. 1400 0 0 1554 1554. 1500 0 0 1654 1654. 1600 0 0 1754 1754. 1700 0 0 1854 1854. 1800 0 0 1954 1954. 1900 0 0 2054 2054. 2000 0 O 2154 2154. 2100 0 0 2254 2254. 2200 0 0 2354 2354. 2300 0 0 2454 2454. 2400 0 0 2554 2554. 2500 0 2654 2654. 2600 0 O 2754 2754. 2700 0 0 2854 2854. 2800 0 0 2955 2954. 2900 0 0 3056 3054. 3000 2 2 3158 3154, 3100 4 2 3261 3254. 3200 7 3 3365 3354. 3300 11 3470 3a5~. 3400 15 35'75 3554. 3500 21 6 1528.37 N 1528.66 N i52b.72 N 1528.72 N 1528.57 N 1528.32 N 1527,93 N 1527,66 N 1527.39 N 1526.37 N 1525,38 N 1524,89 N 1524.34 N 1524,04 N 1523,92 N 1523.67 N t522.82 N 1521.46 N 1519.16 N 1516.69 N 1514.93 N 1513.73 N 1512.54 N 1511e56 N 1510.46 N 1509.47 N 1508.11 N 150'7.92 N 1513e66 N i525,06 N 1537.2~ N 1550.62 N 1564.82 N 1579.49 N 1594.32 N 697.37 E 696.89 E ~96.79 E 696.77 E 696.74 E 696.84 E 697.02 E 697.14 E 697.27 E ~97.98 E 699e51 E 70i,5~ E 703.53 E 704.44 E 704e70 E 705~24 E 705.44 E 705,14 E 704.30 E 702,89 E 701.76 E 700.83 E 700.80 E 701.47 E 701.56 E 701.91 E 704.08 E 708.95 E 715.32 E 726.29 E 743,64 E 764e31 E '788.41 E 815.80 E 846,25 E MEASURED DEPTH AN[) (.)Ti4kR DAI"A FOR EVERY F¥'EN i00 FEb. l' OF 5Ut~ 5LA DEPTH, TRUE NIEASURED VERTICAL SUB ND-TVO VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECT ION TOTAL COORDINATES 3682 3654, 3600 28 7 3790 3754, 3700 36 8 3900 3854. 3800 45 9 4011 3954, 3900 57 ~125 a054, aO00 71 la 4242 4154, 4t00 87 16 4361 4254, 4200 107 20 4483 43540 4300 129 22 4609 4454, 4400 154 25 4738 4554, 4500 184 4876 4654, 4600 222 38 5022 4754, 4700 268 46 5182 485a, 4800 328 60 5362 4954e 4900 408 80 5547 5054, 50'00 493 85 5735 5i5~, 5100 581 88 5925 5254, 5200 671 90 6116 5354, 5300 ?62 91 6308 5454, 5400 854 92 6498 5554, 5500 944 90 6687 5654, 5600 1033 89 6876 5754, 5700 1122 89 7063 5854, 5800 1209 87 r250 595a, 5900 1296 87 7434 6054, 6000 1380 84 7618 6154, 6100 1464, 84 7799 6254, 6200 1545 81 7979 6354, 6300 1625 80 8155 6454, 6400 1701 76 8330 6554, 6500 1776 75 8502 6654, 6600 1848 72 8677 6754, 6'?00 1923 75 8854 6854, 6800 2000 77 9032 6954, 6900 2078 78 9212 7054, 7000 2158 80 1609,55 i625,66 1642,78 1661.15 t68i,47 i703,9~ 1727,61 1777,86 i804,69 1834,72 1868,~1 1907,76 1958,34 2013,85 2072.~ 2134.10 2198.81 2265,19 2330.98 2396.37 2461.36 2525,93 2588,27 2647,35 2703,22 2753,43 280~.38 2854,21 2902.98 2949.12 9998,08 3047,89 309~I46 3150.0~ 680,53 918,21 959.53 1004,93 i055,25 1110,88 1171.25 1237,00 1~08,46 1386,75 1476,07 15'77.69 1695,88 1836,21 1982,37 2130.07 2279.19 2428.63 2577.76 2725.52 2872.38 3018.35 3163.45 3307.8Z 3451.~i 3594.50 3737.73 3877,70 4014,62 4148.60 4281,76 4416,25 4553.11 4692~06 4832,69 ?~EASURED 9EPTH AhiD OTHER DATA FOR EVERY EVEN ZOO FEET OF: SUB SEA DEPTt'-i, TRUE :'.'~E ASUR Ef) VERTICAL SUB t,'!, D- T VD 'vERTICAL .. ,_. ~ ,_~.tx ~ C T ION TOTAL r~FP TH DEPTH SEA D~FFERENC;: ~ ....~' ~..,.GRD t NATES 9391 7!54. 7100 22.37 79 9570 7254, 7200 2316 79 974.0 7354. 7300 2395 7q 9926 745~, 7~00 2~72 77 10102 755~. 7500 25~8 76 10277 765~, 7600 2623 75 10~52 '775~. 7700 2698 7~ 10628 785~. 7800 2773 75 10803 7954. 7900 2849 76 10981 F05~. 8000 2926 77 ] 1158 8154. 8100 3004 78 2~338 8256. 8200 308~ 80 11518 8354. 8300 3t6~ 80 11697 8~5~. 8400 3243 79 1187~ 855~. 8500 3320 77 120~8 865~. 8600 339~ 7~ 12215 875~. 8700 3~81 67 12373 885~. 8800 3519 58 12526 895~ 8900 3572 5~ 12877 905~. 9000 3823 5t 3202.02 3254.79 3307. ,6o 3359.28 34.09.88 3~b9.28 3505.41 3552.80 3598,37 ~6~2 · 07 3687.34 3775 . 67 3818.98 3861.81 3895.20 3910,79 3927.98 3944.85 Z+971,71 ~z 5i10.~+9 E 5249.01 i 5385.94 i 5521.87 E 5658.35 E 5792,23 g 5928,78 E 6065.42 E 6205.69 E 6345.07 E 5487 · 74 i 6630.61 E 6772e24 E 6912,96 E 7051.18 E '7182.91 E 7304.,,/4.5 E 74,19,,67 E 7533.05 E ~'NTERPOLATED VALUES FOR u_vdN lOOO FLLT OF ?iLASdRt!D DEPTH, TRUE ;"';E &SUR ED VERT ]' CAL ,.5US. DEPTH DEPTH SEA TOTAL COORD INATE£ !OOO 999, 9&5, 1527.02 N 697.49 2000 1999, 1945, 1517.9~ N 703,6i 3000 2998, 2944, 1~18,~1 ;'4 719,12 4090 3964, 3890, 1659,21 N lOOC,l~ 5000 4739. ~685, 1863.05 N 1561,57 8000 5293~ 5239, 2159~18 ~ 2338~0i 7000 5820, 5766, 2504,20 N 3114,57 ~000 6365, 6~11, 2810,40 N 389~25 9000 69~5~ 68~1e 3089,B~ N &~67~06 !O00O 7495~ 7441, 3380.52 N 5~42.8S !1000 8064. 8010, 3646,92 N 6220,63 !20~0 8625. 8571. 3887o19 N 7012,67 HORIZONTAL VIEW SCALE I"= I000' ATLANTIC RICHFIELD COMPANY DRILL SITE 9-10 RADIUS OF CURVATURE MAGNETIC SINGLE-SHOT 400 - 800- 2000 VERTICAL SECTION SCALE I": I000' ATLANTIC RICHFIELD COMPANY DRILL SITE 9-10 RADIUS OF CURVATURE MAGNETIC SINGLE-SHOT ALL DEPTHS SHOWNI ARE TVD, Eastman/ I Whipstock l~~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY Atlantic Rich£ield COMPANY D. S. 9-10 WELL NAME Prudhoe LOCATION JOB NUMBER A177 S0268 TYPE OF SURVEY Multi-shot DATE 2-10-77 SURVEY BY Shyam Talwar OFFICE Alaska ~LG_2_{E__T..!__C___M__ULTISHOT SURVEY DECLINATION 31 DEGREES EAST ADIUS OF CURVATURE rqETHOD OF COMPUTATIONS K B ELEV, 54, FT, DMPUTED FOR EASTMAN WHIPSTOCK INC, BY F, M, LI',~DSEY AND ASSOCIATES RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B ,', EL~CTR_O,__N_NI__C__CO__LM_P__U__T_E_,~ ' TRUE DOG EAS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES C L O S U R E S SEVERITY SEC EPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE DEG/iOOFT DISI INCE .................. ................................................................... ............................................................ ...... ............ 0 0 0 0,00 -54.00 N59,00W 1528.00 N 698,00 E 1679,87 N 2'~ 33 4 E 0.000 1287,26 1~0 0 30 t39.99 85,99 N59,00W 1528,~1 N 697.47 E 1679.9~ N 24 31 49 E 0.357 1286.92 231 0 15 230.99 176.99 N59.00W 1528.62 ?.! 696.96 E 1680,01 N 24 BO 37 ~ 0.275 1286.59 322 0 0 321,99 267,99 N59e00W 1528,72 N 696,79 E i680,03 N 24 30 12 E 0e275 1Z86,48 413 0 0 412.99 358.99 N59.00W 1528.72 N 696.79 E 1680.03 IN 24 ~0 12 E 0.000 1286.48 504 0 7 503.99 449e99 S 7.00E 1528.67 N 696.72 E 1679.96 N 24 30 7 E 0.143 1286.g0 595 0 7 594.99 540.99 $24.00E 1528.48 N 696e78 E 1679.80 N 24 ~0 23 E 0.042 1286.36 686 0 15 685.99 631.99 S24.00E 1528.20 N 696.90 E 1679.60 N 24 ~0 51 E 0.132 1286.35 777 0 15 776.99 722.99 $24.00E 1527.84 N 697.06 E 1679.~4 N 24 B1 28 E 0.000 1286.34 _._~ ......... 0 ......... 9 .......... ~.~Z..9...?.9 ..... a!..~,..9~ ........ ~2a,OOE 1527,66 N 697.14 E 1679.21 N 24 31 46 E 0.275 1286.34 959 0 25 958.99 90&.99 S29;~6'E ............ i"~"~"~'T~'~--"~ ......... ~'~T';-~-~'-"'~ ......... i"g~-';-6'~ ....... ~"'2~ 32 i'~'E .... ~%'j ............... ~-~'~'~'l .... 1050 1 0 1049.98 995.98 S40.OOE 1526.42 N 697.93 E 1678.42 N 2~ ~4 17 E 0.648 1286.52 1141 1 5 1140.97 1086.97 S69.00E 1525.46 N 699.28 E 1678.10 N 24 37 36 E 0.089 1287~'~2 1232 1 15 12~1.95 1177.95 $80.50E 1524.98 N 701.06 E 1678.41 N 24, ~1 21 E 0.176 1288~k~.~ 1323 1 13 1322,93 1268,93 $72,50E 1524,52 N 702,97 E 1678,79 N 24 45 17 E 0,03~ 1290,25 1414 0 25 1413.92 1359.92 S72.50E 1524.13 N 704.21 ~ 1678.95 N 24 47 56 ~ 0.879 i291,21 1505 0 5 1504.91 1450.91 $6!.75E 1523.97 N 704.58 E 1678.97 N 24 4,8 4~ ~ 0.36~ 1291.47 1596 0 20 1595.91 i541.91 S81.50E 1523.86 N 704.91E 1679.01N 2~ 49 27 E 0.275 1291.72 1687 0 30 1686.91 1632.91 $16.00E 152~.45 N 705.38 E 1678.83 N 24 50 42 E 0.17~ 1291.97 1781 0 37 1780,91 1726,91 $1B.,00W 1522.53 N 705,4.1 E 1678,01 N 24 51 32 E 0,138 129'1,60 1.875 ! 15 1874.89 1.820.89 S15.50W 1521.04 N 705.03 E 1676.49 N 24 52 7 ~ 0.660 1290.61 1969 1 45 1968.86 1914.86 $30.50W 1518.78 N 704.07 E 1674.04 N 24 52 16 E 0.532 1288.77 2063 1 27 2062.82 2008.82 $29.50W 1516.50 N 702.75 E 1671.41 iN 24 51 ~7 E 0.309 1286.60 2157 O 52 2156.80 2102.80 S36.00W 1514.88 N 701.7i E 1669.51 N 24 51 15 E 0.617 1284.97 2251 0 50 2250.79 21~.79 S~8.50W 1913.76 N 700.86 E 1668.14 N 24 50 37 E 0.043 1283.72 RECORD OF SURVEY ALL CALCULATIONS PERF'OR~N'ED BY I B ~,~ ELECTRONIC COP'~PUTER TRUE DOG LEG MEAS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION DEPTH ANGLE DEPTH SEA DIRge DISTANCE ANGLE DEGtlOOFT DISTANCE D Fi DEG, D M S 2345 0 37 2344,79 2290,79 528,00E 1512,63 N 700,76 E 1667,06 N 2~+ 51 25 g 0,224, ~~_0__4__2 _~8,78 2384,78 ~39,50E 1511,71 N 701,35 E 1656,4__9 ?._j~.._2_4 53 21 E D_,O..P_8~ ...... ~533 0 37 ~532.77 2~78,77 $1~,OOW 1510,68 N 701,60 E 1665,65 N 2~ 54 ~1 E 0.089 1283.06 2527 0 33 2626.77 2572,77 $29,25E 1509,74 N 701,72 E 1664,86 N 24 55 44 E 0,085 1282.77 2570 1 0 2659,76 2615,75 544.00E 1509,28 N 702.07 E 1664.58 N 24 96 47 E 1.0~7 i282,~9__ 2~69 3 0 2868,63 2814.63 N68.00E 1507,92 N 708.47 E 1666,05 N 25 9 57 E 1.009 1288.08 2962 6 45 2961,28 2907.28 N42.00E 1512,41 N 714.,89 E 1672.86 N 25 17 57 E 4.05i 1295.81 3055 iQ 10 3053.25 2999,25 N50.O,Og 1521.91 N 724,72 E 1685.65 N 29 27 48 E 3.687 1308_ 314.9 1~ 0 3145.33 3091.3~ N55.00E 15~Be39 N 739.69 E 1702.48 N 2~ 45 7 E 3,023 1327,22 3242 14 50 3235.59 3181.59 N56.00E 1546,06 N 758.13 E 1721.94 N 26 7 1'7 E 1,980 1329.32 3335 15 40 3325,32 3271,32 NEO.OOE 1559,03 N 778.88 E 1742,7~ N 26 32 46 E 0.94~ 1373,62 3428 17 0 3414.56 ~360,56 N63.00E 1571.51 N 801,86 E 1764,26 N 27 1 58 ~ 1.456 1399.74 ~522 18 45 3502,02 3450.02 N65,00E 1584,15 N 827,79 E 1787.40 N 27 35 gO E 1,875 1~28,59 3616 20 5 3592.67 35~8.57 N66.OOE 1597.12 N 856.23 E 1812.16 N 28 11 46 E 1.431 1459.83 3709 21 30 3579.51, 3625,61 N67,005 i610,28 N 886,51 E 1838.18 N 28 50 2 3803 23 O, 37~.61,,, ~71~ 2.51 N69.00~ 162~.61 ........ FI 919.50 =' 1~65.oI N 29 31 27 ~' 1,028 152~,36 ~'89'7 24 55 ~852.50 3798,50 N68.50E 1~7.45 N 955,09 E 1895.64 N 30 15 14 E 2.055 1566.43 .~988 26 50 3934,37 3880,37 N69,00E 165'1,85 N 992,11 E 1926.8.9 N 30 59 21 E 2,102 4082 29 0 4017.42 3963,42 N68.50E 1657.80 N 1033,1~ E 196i,87 N 31 46 3~ E 2.301 1649~ 4175 30 50 4098.02 a044.02 N68~50E .1684,80 N 1076.29 E 1999,24 N 32 34 17 E 1,978 1696,22 42,68 32 15 4177.28 4123.28 N70.OOE 1702,04 N 1121.79 E 2038,47 N 3B 23 17 E 1,584 1744.70 43_60 3_ 9, 0 4254,32 4200,32 N70,OOE 1719.23 N 1169,03 E 2079.04 N 34 12 52 E 1.902 1796.75 1736.61 1,072 1754.57 N 2.128 1773.35 3,032 1792.28 0.577 1811.33 3,05~ 1901,~.__ 1958,65 2017.~9 2078.99 ..... ~4,D2 34 55 4330,17 4276.17 N7t,OOE N 1218.10 E 2121,22 N 35' 2 48 g 4546 36 55. 4406.28 4352.28 N71,OOE 1.270,25 E 2166.12 I~ 35 54 12 E 4639 39 45 4~79.22 4425.22 NF~.OOE N 1324.80 E 2213.56 N 36 45 42 ~ 4737~~ 4550,5~_.4496,55 N7~,OOE _N. ~381.39 E 2262.86 N 37 37 22 ~ 4825.4~ 55 46~0.18 4566.i8 N72.00E N 1~40.00 E 2~13.99 N 38 29 4 g 4918 45 5 4687.06 4633.06_N71.50E N 1501.36 E 2368.27 N 39 20 31E 5011 48 0 4751.02 4697,02 N71.OOE 1853.26 N 1565.28 E 2425.8~ ~ 40 11 5 E 3.143 2210.13 1831,56 2.33@ 2143.09 ALL CALCULATIONS PEI~FORI¥1ED BY I B i~ ELECTROF:IC CC/PdTER T F?,U E DOG LEG EA S, D'? ! F'T VEF~T !_CAL ~.~..~ ..D_P,___I___F__T_. ..................... Z..._O_Z.&_L..._._~_..O___OR_D I~:[_A__T._E._S__ ......... ~_...L_._.Q _..~._'_d... _~...!~.._ ..S_ .... SEVER ]: TY SECT ~-EI::' T[:I--"-~'~--~'~'---' DEP TH SEA D I REC D 1,5 T ANCE '~i~'~ [!;[::~-CJ'7~-~-~ .............. ~-"~-'~"~'~i':~ ~"~ ..."'"¢1. D E G, " D ?,I $ 510/4 5! 0 4811.4.1 ~757.~1 ,NTZ.OOE 1876,28 ~\ 1632,i4. E 24.86.83 N 41 i 9 E ,~.2,:2e. 51,98 Sa. 0 4868.63 4.814.63 NTI,OOE 1900.56 N 1702.55 E 25.51.69 i~,,i 41 51 22 E 3.191 5292 57 0 /-+921.87 4867,,87 NTO.OOE 1926.41 i',~ 1-/75.66 E 2619.93 1"4 42 40 5 E .3.278 24.31.52 5385 5~ 0 4.971.8:3 4917.83 !',159.00E 1953.88 ~'.,,! 184.9.1:3 E 2(:,90.16 t"4 43 25 19 E 1.:3j~ .......... ..5.Lt2.Z_5_~30 5020.25 ..... ~. ~__NTO,,,OOE ]gS1.2R [xi !922.4.o E 5570 58 5 5069,12 5015.12 NTO,50E 2008.01 N 1996.87 E 2831,89 N 44. 50 26 E 0,587 2566~ 5663 58 .'30 5118,,00 5064,00 NTO,50E 2034,43 N 2071,45 E 2903,z+2 N 45 31 0 E O,O4~k .... 2745,01 5758 58. ~ .5157.81 ,5113'81. NTO.50E 206'1,43 ~_ g1./-+7.71 L__Zg?,b_9...:}. ixl~6 ,,.lO _. 2_..Z._~[ ............. .{,..d_d3_ ...... ..Z¢_i2.t.CT,_~ " 5851 58 15 5216.75 5152.75 i~71.OOE 2087.50 N 2222.37 E 3049.03 i''446 4.7 32 E P_~7 5944 58 0 5255,86 5211,86 NTI,OOE 2113,21 tN 2297,04 E 3121.23 N 47 23 12 g 0.269 2982,56 6038 58 40 5315.20 5261,20 NTO,OOE 2139,92 N 2372,&6 E 3194.97 i'~ 47 57 0 E 1,054 3052.13 6131 58 35 5363,62 5309,62 NTO,OOE 2i67,08 N 2447,07' E 3268.70 N 48 28 21 E 0,086 3i41,17 6224 58 20 5412,26 5358,26 NTI,OOE 2193.54 ¢'.4 2521,79 E 3342,31 N 48 58 55 E 0.824 3220,01 6319 58 45 5451,83 5/407,83 NTO,50E 2220,25 74 2598.30 E 3417.70 N 49 29 9 g 0,578 3300,57 6412 58 0 5510,60 5456.60 NTO.OOE 2247,01 N 2672.83 E 349i,86 N 49 55 4.7 g 0,894 3379,36 6504 57 10 5559,91 5505:,91 NTO.50. E '227'3-26 N 2745.93 E 35'64.80 N 50 22 47 E 0.980 34.56"64 6598 57 45 5610.47 5556.47 NYO.50E 2299.71 N 2820.62 E '3639.31 N 50 48 ~2 E 0.617 3535.45 6691 57 5 5660,55 5606,55 N70,50E 2325,87 N 2.894,4.9 E 3713.19 N 51 6876 58 0 5759,30 5705,30 N70,OOE 2378.41 N 3041,84 E 3861,30 6970 57 35 5809,40 5755,40 NTO,50E 2405,g9 N 3116,70 E 3936,91 N 52 20 28 E 0.578 3848,1~ 7063 57 30 5859.30 5805,30 NTO,50E 243!,48 N 3190,68 g 4011,55 N 52 4i 25 E 0,097 3926,21 7154. 58 30 5907,53 5853,5~ NVleOOE 2456,93N 3263,53 E 4084,99 t''4 53 1 33 E 1,169 4002'93 724.8 59 0 5956,29 5902,29 NTI.OOE 2483.09 N 3339.52 E 4161,50 f"~ 53 22 2 E 0.532 4082,78 7341 58 55 6004.24 5950,24 NYl,OOE 2509,03 ~ 3414,86 E 42~7,52 N 53 41 37 g 0.07~ 4161.96 7434 58 0 6052.88 5998,88 NYl.OOE 25~4.84 ~ 3489,81 E 4313.26 N 54 0 25 E !,000 4200.72 7528 57 50 6102.80 6048,80 N71,OOE 2560.77 ~q 3565,12 E 4389,49 N 54- 18 ~9 ~ 0.i70 4319.86 7621 57 0 6152.88 6098,88. /%7!.00E' 2586,28 N ~639,21 g 4464,6i i'q 54 35 58 E 0.903 4397,72 7715 57 0 6204.08 6150.08 F!71,OOE 2611,95 ~ B713,75 E 4540,29 i~ 54. 52 4-9 [ 0.000 4476,05 RECORD OF SURVEY ALL CALCULATIO[\S PERFOI-~,~,ED BY ! 63 ,'¢, ELECTRO;,,IC Cu,'~PUTER __,rMEAS. 'DRIFT VERTICAL SUB DRIFT TOTAL C&ORDINATES C L 0 .$ U R E $ SEVERITY SECTION DEP T~-~ A, ,,~LE PTH SEA DIRE( DISTANCE ANGLE DEG/iOOFT ~iSTAi~EE 7808 5~z__25 6255.11 6201.I1 N71.OOE 2637.26 N 3787.26 E 4615.03 N 55 8 54'E 79~__D__~5___~_~.0.7~.3~__~53.~ ........ ~3__,3,..50~ 2561.09 ~,) 3861,70 E 4689.79 t'~ 55 25 45 E 7995 ~ 5 6359.21 6305.21 NT2.00E 2663.98 N 3935.~1 E 4763.53 N 55 ~2 20 E 4707.14 8090_5~ 30 6412.61 6358.61 N7i.50E 2708.58 ~ 4010.02 E 4839~08 N 55 57 46 E 0.717 4'785.09 ~lSa 5~ 5 __~466.13 _ 8277 54 45 65i9,58 8371 54 0 6574.33 6a12.13 N7~.O0~ 6455.58 6520.33 N71.50E 27~2,78 N 4083,41 E 4913.49 N 56 12 28 E 0.5~4 48~t,75_. 2756,93 N 4155,58 E a986.94 N 56 25 18 E 0,805 4937,29 2781,49 ~ 4227,94 E 5()60,8~ ~ 56 39 34 E 0,~71 501~.17 8559 53, 45 _ 8652 53 50 6630.2.9 6576.29 NTI..OOE 5685.42 6~32.42 N7:! .50E 67~1,35 6687,35 N72,00E 2805,77 N 4299,45 E 5i33,97 N ~ 19 E 1.i88 50~8,18 ~. 2830.01R 4370,86 5 _ 520_7,05 N 57 4 41 ~ 0.938 5163.07 2853.51 N ~442,13 E 5279,68 iN 57 17 3 E 0,36~ 5237,52 8746 5.4. 5~. 6796,09 6742.09 N73,00E 2876.48 N ~515,00 E 8838 54 55 58~8.95 6794,95 NT3.00E 2898.50 N 4587.01 E 53~,45 N 57 29 56 E 1.361 5313.19 5426.05 N 57 42 41 E O.O00 5387.67 9' . · 549 8 3L 5~ 55 5902.38 684~.38 N72,00E 292i ~9 t'4 4659.60 E 9 902~ 55 45 _6955,27 ~_Q_l_Lg_/__NT3,00E 4__~_ 4732,56 E 557~ 911~ 56 15 7007,84 ~4 _N_~_O_iOE 296.7.,t7~ 4807,08 E 5649 ..... 9212 56 50. ~882,08 E 5724 9304 5.6 30 7110,21 , 7056,21 _ NTB,50E 3012,26 N 4955,69 E ~799 9~96 ~ 10 7161.21 7107,21 N73,50E 3034,00 N 5029,10 E 5873 · 68 N 57 54 50 E 0-880 .74 N____~ E 1.148 ,o9 N ~8 I8 ~, E 0.~32 .99 N 58 30 50 E 0.698 5693,~6 ,36 N 58 ~2 25 ~ 0,529 5769,43 · 42 N 58 53 52 E 0,359 5845 E .5948.90 N 59 5 25 E 0.375 5922 E 6024,25 ;*q 59 t6 ~+O ~ 0.51~ 5998.96 9490._.~5 ~ 7213,59 7159.59 N74.00E 3055.84 .9584 55.45 726&,27 7212.27 N73,50E 3077.63 9677 55 5 7319,05 7~65,05 N73,00E 3099,70 ~769 55 35 _7~ 73~7,37 N73,OOE 312i.82 98&1 55 qO 742~.42~__j3L23.505 3143.68 9952 55 4~. 7474.80 7420.80 N73,50E 3165.02 1004~ 55 ~5 .... 7526.58 7472,98 N74,00E. 3186.~0 l.Ql~A_~~2578.5~~74'OOE 3207,2_i_N 10227 55 DO 7630,06 7576~06. N74.0OE 3227.9C 10317 5k_ 5, 7681.,~0 7627,30. N74.~OE 32~7.98 10408 55 35 7733.06 7679.06 N74.50E 32~7.98 5104.0~ 5178,78 5252.10 5324.47 5397.11 5469.12 5542,13 5615.12 5687.21 5758,42 5830.55 5098.58 N 59 27 5 E 0,796 6245,9~_,~__[~%~~~ 0.382 8318.91 N 59 56 30 i 0.275 __. 63~.2.79 N 60 6466,52 N 6539.40 66%1.27 ~'~ 60 34 30 E 0.589.. 5683.94 N O0 43 46 E 0.549 5074,04 6149.49 6.298.56. 6373,7~_ 6522.60 5~95~52 6669,2~ ALL CALCULATIONS DERFOR',~ED 5Y I [13 X ELECTRO~',,~IC CO?iPUTER T q U E b_G~G~ ,EPTH A~"~GL E DEPTH ,SEA DIREC DISTANCE ANGLE DEG/iOOFT DISTANCE 0772 5~ 4.5 7938.11 ~ ~ ~ ,884.11 N75.50E 3847.73 tx! 6120,51 E 697~.25 1'~ 61 19 21 E 0.i78 69~5.~2 0863 56 0 7989.16 7935,16 N75.00E 3366,91 N 6193,36 E 7049~39 r'~ 6i 28 12 E 0.~67 7039.34 0954. 56 0 8040,05 7986,05 N75,50E ~86,12 ~.'. 6266.32 E 7122,68 N 61 36 52 E 0.456 lOa6 56 5 8091,44 8037,44 N75,50E ~405,22 N 6~40,20 E 7196,78 N 6i 45 ~7 E 0,09~ 7188,38 1137 55 55 8142,31 8088,3~ N76,OOE ~42~,80 N 64i3,~3 E 7270,02 N 61 ~4 15 ~ 0,4i6 726~... 1229 56 15 8193,64 81~9,6~ ~x~76,00E ~442,27 N 6487,41 E 7[~44,10 iN 62 2 57 E 0,348 7~37,21 1320 56 10 8244.25 ~190,25 N78,50E B458,96 N 6561,17 E 7417,i0 N 6.2 i2 8 E 1,S98 7410,98 .1410 56 55 8293,85 82~9,85 N77,50E 3474,57 N 6634,~2 E 7489,38 N ~2 21 31 E 1,150 7~8~+~0i..~ 1502 57 5 8343,95 8289,95 N78~OOE 3490,94 N 6710,03 E 75~,81 ti 62 30 50 E 0,421 1595 56 55 8394,59 8340,59 N77,5OE 3507,~9 ~,~ 6786,26 E 7639,10 N 62 40 3 E 0,~t5 7635,07 .1689 56 5 8446,45 8392,45 N77,005 3524,79 N 6862,72 E 7714,99 ~'~ 6g 48 51 E 0,966 7711,54 .t783 56 0 8498.96 8444,96 N77,OOE 3542,~ N 6938.~9 E 7790,61 ~ 62 57 17 E 0,096 '7787,67 .1876 55 0 8551,63 8497,63 N77,'00~ 3959,57 N 701BeB7 E 7864,98 N 6~ 5 25 E 1,075 78~2,50 1970 54 50 8605,65 8551,65 N76.00~ 3577,5~ N 7088,17 5 7939.83 N 6~ 13 8 5 0,731 7937,75 2001 54 5 8623,67 8569,57 ~75,00E 3583,64 N 7112.65 E 7964,~3 ~'~ ~3 15 33 E 2,~19 2033 54 0 8642,46 8588,46 N77,0OE 3589.68 ~.3 71B7,83 E 7989,65 N 63 18 6 E 2,065 7987 .. 2053 54 0 8654,22 ~600,22 P~T7,5OE 359:~,25 N 7153,62 E ~005,35 N 6~ 19 ~6 a 2,023 8003,60 2115 D4 10 8690,58 8636-.58 N77,50E 3604,12 N 7202,64 E 8054.05 N 6~ g5 1 g 0,274 2177 52 15 8727,7i 8673,71 N80,50~ ~613.59 i',~ 7251,37 E 8101,88 N 63 30 ~i f 4,329 2270 5]. 0 8785,45 87~1,45 ~'184.50E ~623,11 ~'.~ 7~23,64 E 8170,84 N 63 40 ~9 i 2,92D 8169,94 2456 49 0 8905,62 8851,62 7486,00E 3633.94 ~'xl 7465.17 E 8302.6'7 N 64 2 ~7 g 0,538 2549 49 0 8966,6~ 8912,63 N85,00E 3639.45 ~.~ 7535,1~ i 8368.04 i~ 64 t3 i0 E 0,~12 5~67,9i 2q90 a8 45 8993.60 o.m. ~60 N86,00E 3641,87 N 7565,93 E 8396.82 ik 64 17 45 E i,508 8396,75 268¢ 48 30 9056,39 9002,.39 N86eOQ~ 3646,85 b,, 7637,05 E 8463,10 N 64 28 28 E 0,26'.~ 8463,09 2715 4S 25 .9076,29 9022.29 N86,00E 3648.41 ~x~ ~659.45 ~ ~' 64~,99 N 64 31 48 i 0,267 8483,99 ~OTTOM HOLE CLOSURE 8483.99 ~JS[I AT N 64 31 48 E ~EASUR:_LT&~?~-''Tn~;:~-~~JJ--~-DEPTH AND OTHER DATA .................... FORT: .................................... EVERY; ............. -JT'";~r~ ¢,_.1,, .............. ].Ou;'~-----'-FEET ........ uF:T" :~:- ~aUK ,,..,EA TRUE ,-IEASURED VERTICAL SUB ;',iD-TVb V~RTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION T~TAL COORD~,~ATE5 154 154, 100 0 0 1528,~7 N 697,37 25~ 254, 200 0 0 1528,~6 iN 696.89 354 354, 300 0 0 1528,72 iN ~5~ ~5~. 400 0 0 1528,72 554 55~, 500 0 O 1528,57 I'~ 696,74 65~ 65~. 600 0 0 1528,32 N 696.8~ 754 754, 700 0 0 t527e9~ Iq 697,02 854 854. 800 0 0 1527,66 iN 697,1~ g54 95~, 900 0 0 1527,39 N 697,27 1054 1054. 1000 0 0 1526,37 115~ 1154. 1100 0 0 1525~8 tN 699.51 i254 1254, 1200 0 0 1524.89 N 701.53 1354 l~5&. 1300 0 0 152~.3~ l'4 703,53 1454 1454. 1400 0 0 152~.0~ iN 1554 155~. 1500 0 0 i52~,92 N 704,70 1654 165~. l&O0 0 0 i523,67 N 705.2~ 1754 17~. 1700 0 0 1522.82 N 1854 1854. 1800 0 0 1521.~6 ~'~ 705.14 1954 1954, 1900 0 0 1519.16 205~ 205~. 2000 0 O 1516,69 N 702,89 215~ 21~: 21:00 0 0 151~,93 N 701.78 225~ 225~, 2200 0 0 1515.7~ iq 700,8B 235~ 2S5~, 2S00 0 0 i5i2.5q 2~5& 245~, 2400 0 0 1~il,56 255~ 255~, 2500 0 0 1510,~b 2654 265~, 2600 0 0 1509,47 N 701.91 275~ 275~o 2700 0 0 1506,~0 N 70~o85 E 2854 2854. 2800 0 0 1507.81 N 707,76 E 2955 2954. 2900 0 O iO.ii.8~ % 714.28 E 3056 3054, 3000 1 1 152i,99 N 724.U2 ~ B158 3154. 3100 3 2 1534.55 3261 325g, 3200 7 4 1548.77 N 762.20 E 3~65 3354. 3300 10 5 i563.05 "x, '785,98 ~ 3469 3454. S400 15 D 1576.99 F~ 812,U2 E 3~75 355~. 3500 20 5 1591.~0 ~',: 843.53 Fi -- "'!EAikJFiED . VERT ! CA__L_ SLJ5 :',.~tP-TVU vLRT I CAL_ ~,c~ T~ ';,'.-- P T H ..,5. F A D IF'FERENC~- CO R !~~ T Q_]i6A,, C~Q%~I qAI~ 3~,'.q.o ~754. 3700 35 ~, 1821.65 N 914.43 E %,~ .,'. ........................... ~ '~ aOlO 3954. 3900 56 12 1655,46 :'4 1001.46 _ ~+ 1 Z 4 ~ 0 5 4. 4 o u o o. 1 ~_ ............... 16._7p_._ 42/40 4154, 4100 86 a36C) 4254. 4200 105 i9 1719.i6 i'~ 1168.82 i ( 4736 4554. 4500 182 30 179~.08 r~ 4872 4654, z+600 217 35 1821,45 N 1470,71 ................ ~..~22.~ ......... _~_7_~&._ ....... .~!9!). .......... ._2._s.! ..................................... ~ ........................ ~ s~!..!~___?_,.L ............ 5173 4854, 4800 319 58 189~,01 N 1683,63 5351 4954, 4900 397 78 194~,66 N 1822,23 ~541 5054. 5000 487 90 t9eo .... · 91,'~" 1973.60 5731 5].5a, 5100 577 90 2054,24 5921 5254, 5200 667 90 2106,86 N 2278~59 6112 5354, 5300 758 91 2161,53 N 2431,83 6303 5454, 5400 849 91 2215,9~ N 2585,32 6493 5554, 5500 939 ..(., 227(),43 6678 565&' 5600 I024 85 2322.78 N 2884,00 6866 5754. 5700 1tll 87 2375,83 ~"~ 7053 5854. 5800 1199 88 2429,24 N 31~2,52 7243 5954, 5900 1289 90 2,481,70 N 3335,46 7436 6054. 6000 1382 93 2535,39 N ' 34.91,41 7623 6154, 6100 1469 87 2586,83 N 364(), 80 7806 6254' 6200 1552 83 2636.70 i"~ 3785.64 7985 6354. 6300 1631 79 Z681,'74 ;i ~927,4i 8162 6454~ 6400 1708 77 272'7,48 N 4066,t5 8336 6554~ 6500 1782 74 27'72,57 ~,.~ 4201,01 . 9° N 4328 94 8504 6654, 6600 1850 68 2815, 8673 6754~ 6700 1919 69 2858,72 N 4458,29 8846 6854. 6800 1992 75 2900,42 9021 6954. 6900 2067 75 ~ 2943.66 N 4730.19 9201 7054. 7000 2147 80 2987.41 N ~+873.28 T R ~., E DEPTH DEPTH SEA D IFFEREi'~CE CORRECTION TCTAL COORDINATES 9323 7154. 7100 2229 8Z ~031.~9 N 9562 7254, 7200 2308 79 3072,67 9738 7354. 7300 2389 76 3114,35 9915 7454, 7400 246'1 77 3156e71 10092 7554, 7500 2538 77 3197,22 10269 7654, 7600 2615 77 3237,43 N 5720,45 10445 7754, 7700 2691 76 8276,40 10800 7954-. 7900 2846 78 3353,72 ;",; 6142,88 10979 8054, 8000 2924 78 ~91,47 11157 8154, 8100 3003 79 3427,81 ]1337 825a, 8200 3083 80 3461,92 ~'~ 6574,99 11520 835g, 8300 3166 ...... 8~ 3494.11 11702 8454, 8400 3248 82 3527,22 N 6873,23 E 11880 8554, 8500 3326 78 3560,31 N 7016,56 E ~2052 8654. 8600 3398 72 ~59~,14 ~,4 7152,81 ].22]9 8754. 8700 3z+65 67 25618,82 N 7284,03 g 12377 8854. 8800 3523 58 1~829,7'7 N 7405,48 k2529 8954. 8900 3~75 52 8638,17 N 7520.10 12681 909~. 900(3 3627 52 3646,64 N 7634,,06 TRUE mF'ASURED ~ __ 9_E_P TH vEpT I CAL 5.UB ~.') E P Tld. ......... $ E._A_ ........_T3_Q~_A__L_ ..... CO0 R D [ i'~ A T E 5 1000 999. 945, 1527.02 N 697,49 2000 1999, 1945, 1517,98 N 70~,61 3000 2998, 2944. 1515,98 N 718,29 4000 3945, B891e 1653,80 N % 997,19 5000 4743, 4689, 1850.88 N r,/ 1557.48 E \j' 6000 5295, 5241. 2128,94 N ~' 2341,96 7000 5825. 5771. 8000 6352, 6308, 2413.95 NV' 3i~0,50 E ~' 2685.26 N ~ 3939.35 E J 9000 6941e 6887. 2938.5~ N 4713,62 E / lO00O 7501, 7447. 11000 8065. 5011, 3176.44 N k.,,., 5507,12 E ,/ 3B95.99 N V 6~0~,16 E ¢ 12000 8623. 8569, 3583,44 N 7111,86 4OO - 800 .. 1200 1600 VERTICAL SECTION SCALE: I"=1000' ATLANTIC RICHFIELD CO. DRILL SITE 9-10 MAGNETIC MULTISHOT SURVEY RADIUS OF CURVATURE METHOD -2400 -2800 ALL DEPTHS SHOWN ARE TVD ( (. HORIZONTAL VIEW SCALE" I"= I000' ATLANTIC RICHFIELD CO. DRILL SITE 9-10 MAGNETIC MULTI SHOT SURVEY RADIUS OF CURVATURE METHOD ALL DEPTHS SHOWN ARE TVD eOoo @@oo ~o0 TVD: 9,076' TMD: 12~715' ATIj~. NTIC RICHFIELD North Alaska District EngineerLn,~. . . TRANSbl I.TTAL Date. April 12, 1977 From: J.A. Rochon/p. Hell.strom Well Na~.e' .. D,. S. #..9-10.. Transmitted herewith are the following for the subject ;veil: Run' No. Scale Xerox Sepia BL Lin~ BHC Sonic/Caliper Log-.' BHC Sonic/Caliper ' G~mma Ray Lpg BHC Sonic/Gm, ma Ray Log C~tiper/CC5 cement Bona Lo~;DL -Compensated Formation Den~_i..ty_ Log "_ Compensate~ Neutro~-~ormatio~ De~ity Compensat~t Neutron Log Core Analysis - Interval · Core No. Core Description [~;rC) - Interva]' COre Description CConv.) - Core No. = __ Directional .Survey- Gyro .- Single Sh~t ' Multishot - . - . -._. - · Drill Stem Test - Test No. ~ Induction Laterolog Formation Density Log Formation D~nsity Log/Gamma Ray Gm, ma Ray/CCL Laterolog. Location Plat ~icrolaterolog · ~icrolog -- Mudlog- Interval Smmple Log [A.R.C6.)-Interval) isyn. ergetic Log. TVO-DIL TVO-Porosity Log Induction Electrical Log ReceiPt Acknowledged For' Date: :~lemse return receipt to' Atlantic Richfield Company North Alaska ~' ,~ ; ~ Enozn~r_no H~m~~=r P. O. Box 360 # 211 ATLANTIC RI~IELD COMPAN~f CO DDENTIAL.,.' STATE OF ALAS~ DIVISION OF OIL ~ North Alaska District Engineering TRANSM I-TTAL To' . ..... . .... .. .. From: · Date' Apr.i~..1 6,..1977 Well Nmme' J. A. Rochon/p. Hellstrom , , , D.S. #9-10 Transmitted herewith are the following for the subject well' Run No. Scale' Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gaaana Ray Log Caliper/CCL Cement Bond Log/VDL Compensated.Fo~ation Den%i_ty Log ........ Compensated Neutron-Formation Density Compensated Neutron Log Core Analysi~ - Interval' Core No. Core Description (~VC) -'Interval' ' Core Description (cony.) - Core No. Directional Survey - Gyro Single ShOt Multishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Format_ion Density Log/Gamma Ray Gm. ma Ray/CCL , .. Laterolog. Location Plat Microlaterolog Microlog Mudlog- Interval Sample Log [A.R. Co'.)-Interval) Synergetic Log TVD-Dtl. TVD-Porosity Log 2"~ '5, Receipt Acknm~ledged For' Date' Please return receipt to: ,.. Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 ~185 AtlanticRichfieldCompany North Arneric.?n Producing Division North Alask ..... ~strict Post Office b,.,x 360 , Anchorage, Alaska 99510 Telephone 907 277 5637 March 24, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources 'Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-1 (13-12-10-15) Permit No. 75-76 Drill Site 9-2 (31-12-10-15) Permit No. 76-16 Drill Site 9-3 (31-11-10-15) Permit No. 76-35 Drill Site 9-4 (13- 2-10-15) Permit No. 76-40 Drill Site 9-5 (31- 3-10-15) Permit No. 76-47 Drill Site 9-6 (13- 1-10-15) Permit No. 76-48 Drill Site 9-7 (31- 2-10-15) Permit No. 76-58 Drill Site 9-8 (33-36-11-15) Permit No. 76-70 Dr~~e 9-9__ (31- 2-10-15) Permit No. 76-76 ~-~'8'c~11- 6-10-16) Permit No. 76-82 Dear Si r' j ,.:O I c. k.ti 1 .i ,~'," .:~r':"; ! !. CONFER: FILE: Enclosed please find a Sundry Notice outlining our plans for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /vp Encl osur~e i [!CEtVED Anchnr,'"'lQ L,'utl Form 10-403 Subml t "1 ntentlons" In Tripllca te RE~'. 1-10-73 .-~-~. &."Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OIL r~ GAS N WE EL !~:~3 WELL L.J OTHER 2. NAME'OF OPERATOR Atlantic Richfield Company 3~ ADDRESS OF OPERATOR P. 0. Box 360 Anchorage, Alaska 99510' 5. APl NUMERICAL CODE 50 - 029 - 20235 6. LEASE DESIGNATION AND SERIAL NO. ADL 28345 7. IF INDIAN, ALLOTTEE OR. TRIBE NAME 8~ UNIT, FARM OR LEASE NAME Prudh0e Bay !9. WELL NO. Drill Site 9-10 (11-6-10-16) 10.' FIELD AND POOL., OR W~LDCAT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE} Sec. 6, T 10 N, R 16 E, UM 4. LOCATION OF WELL At SUrface 25' E & 1581' N of SW Cr Sec. 1, T 10 N, R 15 E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropri ate" Box :to 'Indicate-Nature ~3f Notice, Re 12. PERMIT NO. 76 - 82 3ort, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS , yer. torate.. . SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all Dertln®nt details, and give pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate'selected intervals within the Sadlerochit interval All perforated intervals will be reported on subsequent report. A 5000 psi WP Wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will 'be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. Estimated.start date- 15 JUNE 1977 :vision 16. I hereby'certify that the foregolng is true and correct SIGNED~~ T,TLE District' Drilling Engineer.. DATE .. (This space for'State office use) CONDITIONS OF APPROVAL, IF ANYy/ Pe. t r~ lento fn0 i n~:~_r I DATE. See Instructions On Reverse Side Approved Copy Atlan'ticRichfieldCompany North AmerLcan Producing Division North Aia~ )istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 14, 1977 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-10 (11-6-10-16) Permit No. 76-82 I DI lc. I c. I 1 FlqG . _ ......... I ? o':rtLI CONFER: FILE: Dear Sir' Enclosed please fi nd the Monthly Report of Drilling Operations for the above mentioned well. Sincerely, Frank M. Brown District Drilling Engineer /jw Enclosures Form No. P-4 REV. 3- 1-70 OIL WELL SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE 2. NAME OF OPERATOR Atlantic Richfield Company P. 0. Box 360, Anchorage Alaska 99510 5. APl NUMERICAL CODE 50-029-20235 MONTHLY REPORT OF DRILLING AND WORKOVER OPERAT ! ! GAS Fq I 7. IF IND1AN-ALOTTEE OR TRIBE NAME WELL OTHER 'A-i "i', !777 I '~V~?~ ~ k 8. UNIT FARM OR LEASE NAME Pcudhoe Bay DS 9-10 (l -6-10-16) 4. LOCATION OF WELL 25'E & 1581'N of SW cr Sec 1, T1ON, R15E, UM 6. LEASE DESIGNATION AND SERIAL NO. ADL 28345 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec 6, T1ON, R16E, UM 12. PERMIT N~6_82 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Report of Operations for the month of February, 1977 Press tstd 7" lnr lap. Pumped l~" bbls/min @ 2550 psi. RIH & set pkr @ 11,560' _~S._q_~ueez~d~]~/~].~O.~..x~.~..c ass G cmt mixed ~ w/0.2% D13R & 0 75% D65, slurry 15.8ppg. Max ~res§ 5'20-0 psi, finallpress 2600 psi. RIH & CO cmt from 11.,556' - 11,759' Press tstd csg 3000 psi. No bleed off. CO cmt 11,759' - 11,789'. Tstd csg to 3200 psi ~K. ChAd to 5" rams. Tstd BOP, manifold & Hydril OK. Press tstd csg & lnr lap 3000 psi OK. RIH w/DST tools. RIH w/7000' wtr cushion. Set pkr @ 11,707. Opened tools for 3 hr flow tst, lite blow, dead in 1 hr. Closed tools for 1 hr shut-in. Charts indicated small leak. Set EZ drill & 11,660'. S u_~qg_e_ez.e~Lw/75sx cmt. Drld out EZ drill. Tstd lnr & csg to 3000 psi OK. Tstd anul & 7'" lnr to 3000 psi. PU DST w/6975' wtr cushion. Set pkr & 11,640'. Very weak blow decreasing to no blow in 1 hr. Displ & cond calcium chloride wtr. Made up DST tools, RIH & set pkr @ 11,619' w/8400' wtr cushion. Opened tools for 2 hr flow tst. Very lite blow, dead after 15 min. Shut in for 2 hr tst. Charts indicated tst no good. Made up RTTS tool, RIH & set pkr @ 11,618' Broke down & pumped into formation @ 1½ bbl/min rate. At 5000 psi shut in pressure bl&d to 3050 psi in 5 min. Pulled up, set RTTS tool & 11,500'. ~S~q~d.~t/.SQ_~s.x.~p~.eceded~ by 10 bbls wtr & followed by 10 bbls. Displ cmt to form @ 5000 psi @ ½ bbl/min rate. Held 4400# against form for 5 hrs. Released pkr. RIH w/9-5/8" csg scraper & washed cmt stringers from 11,546' to 11,669'. RIH w/7" csg scraper to 12,628'. Press tstd csg to 3000 psi OK. RIH w/DST tools. Set pkr @ 11,619'. Opened tools for 2 hr flowing tst. Very lite blow increasing to strong blow in 15 min, dead after 1 hr in 45 min. Closed tools for 2 hr shut-in. Unseated pkr & POH. Fluid rise 150' Charts indicated from leak thru lnr lap. RU & press tstd tubricator. RIH & perf'd 4 ~oles/ft 12,056' - 12,058'. Ran EZ Drill retainer on 5" DP. Set retainer @ 11,520'. Press anul w/2200 psi. Broke down form @ 3200 & pumped @ various rates, 1 - 2 bbls/min. Mixed 350 sx cmt preceded by 10 bbls wtr, followed by 10 bbls wtr & displ w/est 18 bbls of cmt (90 sx) to form. Final displ press 4500 psi. Bled to 3250 & held for 10 min. PO EZ Drill & rev out excess cmt. PU 8~" bitd. RIH. Circ & cond mud @ 11,400' EZ Drill retainer set @ 11,505'. As of February 28, 1977, drld retainer & cmt to il ,670'. 14. I hereby certify that the foregoing is true a~ correct ~,//~ SIGNED, ,~--~?-'/~,~-~-~¢4 ~ /~'~-&'"'~' T,TLEDistrict Drilling Engineer~ATE '_~//?? NOTg-Report on this ~orm is required ~or each calendar month, regardless o~ the status o~ operations, and must be filed in duplicate with the oil and oas conservation committee by the 15th of the succeeding month,unless otherwise directed. AflanticRichfieldCompany North American Producing Division North Aias~ istrict Post Office BOx 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 3, 1977 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject- DS 9-10 (11-6-10-16) Permit No. 76-82 L~ Dear Si r' Enclosed please find the Monthly Report of Drilling Operations for the above mentioned well. Sincerely, Frank M. Brown District Drilling Engineer /jw Enclosures F~r'm No. P.--4 R:L'%~'. $-I-?0 STATE OF ALASKA SUBMIT ~ DLTPLICAT'~ OIL AND GAS CONSERVATION COMMI'i-I'EE MONTHLY REPORT O'F DRILLING AND WORKOVER OPERATIONS ~ API NLrMERICAL CODE 50-029-20235 LEASE DESiGnATION AXD SERIAL NO. ADL 28345 !T IF INDIAN[ ALOT lEE OR TRIBE 1. ~ O,~S 1. N~E OF OP~TOR 8 L~IT FA~ OR LEASE Atl. ant~c R~chf~ el d Company Prudhoe Bay 3.ADDRESS OF OPhiR g WE~ NO P. 0. Box 360, anchorage, Alaska 99510 DS 9-10 (11-6-10-16) 10 FIE~D ~SD P~L. O~ WILDCAT 25'E & 1581'N of SW cr Sec l, T1ON, R15E, UM Prudhoe Bay - Sadlerochit Pool SEC , T., R., M. (BOT'TOM HOI-~ OB, mC'T~ Sec 6, T1ON, R16E, UM 1~-. PERMIT NO 76 -82 13,REPORT TOTAL DEPTH AT END OF MONTH. CHANGES lINT HOLE SIZE, CASING AN-D CEMENTING JOBS INCLUDING DEPTH SET AND VOLU1VIE~USED. PERFORATIONSi TESTS AND RESULTS FISHING JOB~ JUNK L~¢ HOLE AND SIDE-TRACKED HOLE AND ANY OT~ER SIGNIFICANT CH~NGF~ IN HOL~ CONDITIONS. Report of Operations for the month of January, 1977. Drld 12¼" hole to 12,135' Ran DIL/SP log. RIH & drld 12¼" hole to 12,155'. Unable to pull wear bushing. PU 13-3/8" spear. Engaged bushing but could not pull. Set Baker Model C retrievable BP @ 1000' Removed & replaced 20" x 13-3/8" head. NU & press tstd. Retrieved B~ker BP. RIH breaking circ @ 6000', 9000', & 12,000'. Stuck pipe @ 12,130'. Pulled free. Reamed & CO to 12,095' Cond hole for csg. Ran 9-5/8" 47# butt csg w/shoe @ 12,076', FC @ 11,99~', lower FO @ 2459', upper FO @ 2333'. Cmtd w/lO00 sx Class G cmt mixed with 0.75% D65 & 0.2% D13. Slurry 15.8 ppg. Bumped plug w/3000 psi. Float held OK. Installed & press tstd csg pkoff. Press tstd BOPE. Opened lower FO. Cmtd w/300 sx Arcticset cmt mixed w/0.4% D13 & 0.4% D46. Slurry 15.4 ppg. Closed & press tstd FO to 3000 psi. Opened upper FO. Circ 9- 5/8" x 13-3/8" anul. Pumped 50 bbls prepack followed by 231 bbls gelled Arctic Pack. Break thru @ 165 bbls. Zero % wtr contamination after 70 bbls returns. Closed & press tstd FO to 3000 psi. Drld FC, cmt & float shoe & new hole to 12,168' Press tstd form 11.3 ppg equiv mud weight. Drld 8½" hole to 12,715'. 'Circ & cond mud. Ran DIL. CO to 12,715'. Circ & cond mud. Ran 7" 29# MN-80 butt lnr w/shoe @ 12,708', top of lnr 11,759'. Cmtd w/330 sx Class G cmt mixed w/0.35% D13 & 0.75% D65. Displ w/247 bbls. Bumped plug w/3000 psi. No flow back. As of January 31, 1977, RIH & drld cmt 12,511' - 12,628'. Circ & cond mud. SIGNED TITLE _. NOTE--Report on this form is required for each calendar months regardless of the statue of operations, and must bo filed In duplicate with tho oil and gas conservation committee bythe 15th of the succeeding month, unless otherwise directed. ~01B STATE of ALASKA ~' ' ~m of Oil ~ .7 ~a ...... TVlS .... n TO: ~'[OV le }{ami i ton THP. U: Lonnie ,~ ~mi th Chief Petroletnm Engineer FROM: Harold R. ~ ' Pe tro ie u~m !nsoe,-~or DATE , January 12, ] 977 SUBJECT: Witness BOP ')est, ARCO' s DS q ~a F~c. 1. "{'iON, ,.~-~ ~ e~}..~ 76-8.. ~,.~,.:_. in ~ Fl~glat 9 at 9~OOAP~ ~:or Prndhoe }3ay. i ~ei: 3rian ~.~,,_.<, on He told me as soon as they got out of, the hole with drill pipe they. wnuld, ... ]ra.~ ready for me 'to witness the BOP test. .At 5:00_.>~P}' they were ready to test nnP~s.. ...... The annular oreventer~ was tested 'tr,... ~on00,, . msi;., an(1 held okav..~ .. Whey ,~ere using a wellhead type test pluq The uDDer ~..nc~ lower nipe rams held 5000 psi okay,. The check valve held b:,Ju-nn~ psi okay. Th~...,, check valve did not test the .==irst time .~heV broke it down and f ' ~ ~ rounct rocks under the oluq. Seven valves in the cellar, away from the stack, also w~'t~s~" ' ~ec~ anc~ held 5000 ,-si n!~a,~- The choke-~ ' ~ six~ ~x~anlfolc~ has naliburton low toreue wind v~!v~s 23 fl~n~-s a sunerchoke ~ ' ~ ~ ~,~ a manua~ lv or>erated cho~c~ which also tested to 5000 psi each satisfactorily. The test ste~ was }~u!led and ._h.~ blind ~am~ tested, to 5000 psi okay The master gauge on the accumulator was 2~00o psi . The four ~'~.,~ .~.~ackup ?~ot'tles had 2000~ 2200, 2150 and 2200 psis. The master controls operated in good condition. The remote controls on floor also acouateS, tb.e BOP ' s okay. ~e upper and lower kelly also tested to 5000 psi okay were all ..... on.,~ .... ' = a d ~ in ~J_v~ hour,~ with trir, tex koo,,~ev ~um~, mounted on a 'trailer They also had %we drill stem ~~- ..... ~.~f valves on the xlo..r %hae actuated freely. One was a ball type, the o~.her a dart tyne valve The location was clean and free o~ debri~ They al. so a ~tee! fuel. tank in good shape but not ~ ..... ,~ ~.~.~.,.~,.~.. The well sign was ..~ ~,I data correct. Tests were concluded at. 10 TZ~ sumr:~ary, I w~tn~..:.sed testing of all B{)P~s ano_ ~_,:;~,:~.~:~.~ with one failure eNa~ was. a check valve ., · v. · , ..... X,v.L!lC~z was repairec~ and re _ ..... loc.,t, lon all }~OP ec~uir>ment and other tested okay. When I ~eft -~:,' ' ,. . ,.. insoection~. ! mac~_, w~r~, ........ m~'~ satisfactoryconez' "' ~.mon'-' ' at ~..'"',"o q..~ -.,_~ ,., ~ for ;~cO A1 Oil and Gas Conservation Commi Field Inspection Report Wel 1/Platfm Represented by~k,~!7/~ ~?-Name & Number SatisFactory Type Inspection Yes No Item ~) BOPE Te~ts (,.,) 16. Tes~t fl uid- (~ () (~) () (~i) () (x) () (,x) () (~) () (~) () (x) () (~) () (~) () ( ) Final Abandonment (~[) ( ) ll'~'P&A:Marker- ()) ( ) 12. water' wel l_'( )caPped( )plUgged ()~) ( ) 1,3. Clean-up Satisfactory Ty.pe Inspection Yes NO Item ('/~ LoCatiOn,General (,x] ( ) 1. Well Sign, (~') ( ) 2. General Housekeeping (.,~) ( ) 3. Reserve Pit-(2<)open( )filled (,) ( ) 4,'Rig . ~ ( ).~ S~a. fety Valve Tests ( ) ( ) 5. Surface-No. Wells ( ) ( ) 6. SUbSurface'No. Wells ( ) Well Test Data ( ) ( ) 7. Well Nos. , , , ( ) ( ) 8. Hrs. obser , , , () () 9. BS&W ,--, , ( ) ( ) 10. Gr. Bbls. ) oil ig days or when rea:dy Inspected b 'cc: ~}2~ ///v~/~~ Noti¥~ in ~'.L S.:~. () () ( () () 27. Blind Rams~-~psig 28. Pipe Rams 9-m~psig 29, Kelly.:&. Kelly-cock ~ psi,q I~) (.) 30. Lower Kelly valve~-~sig ~ ~) '( ) 31. Safety :Floor valve~BV (~Dfr't TOtal nUmber leaks :and/or equip, failures 17. Ma ster H,~ 18. N? btls. 19. R~mote Controls 20. Dril 1 in§ sp.o,ol-_~"outlets 21 Kill Line-(X') CheCk Valve 22. Choke FlOwline ( ) HCR valve 23. ChOke Manifold No. valvs 24 ChokeS,(.<)Remote(~()Pos. (~.--)-A~j~ 25. Test Plug-(×)Hellhd( )cs9( )none~ 26. Annular Pr, eventer,~m~psie AflanticR~chfieldCompany North American Producing Division North Alasl~" ,strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 3, 1977 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-10 (11-6-10-16) Permit No. 76-82 Dear Sir' Enclosed please find the Monthly Report of Drilling Operations for the above mentioned well. Sincerely, C. R. Knowles District Drilling Engineer CRK/jw Enclosures RECEIVED JAN -6 lg77.., Dlvlat~m 9f 01t ~il~ ~ ~o. P-~ STATE OF ALASKA ~,..~ · ~- I-?0 SUBMIT IN DUPLICATE OIL AND GAS CONSERVATION CO/W~I'FrEE MONTHLY RE'PORT OF DRILLING AND WORKOVER OPERATIONS ~-. API NUA{ERiCAL CODE 50-029-20235 6 LEASE DESIGlgATION A>,'D SEEIAL NO. ADL 28345 2. NA/~E OF OPE~A. TOR Atlantic Richfield Company 99510 3. ADDRESS OF OPER-S-TOR P. O. Box 360, Anchorage, Alaska 4. LOCATION OF WFJ-~ 25'E & 1581'N of SW cr Sec l, Il ON, R15E, UM 8. L.~IT,F.~RA{ OR LEASE NJkME Prudh0e Bay g. WELL NO DS 9-10 (11-6-10-16) 10. FIF_J.2D A-ND POOL, OR WILDCAT _Prudhoe Bay - Sadlerochit Pool 11. SEC., T., R., M., (BO~'FOM HOLE OB~ZCTrV~ Sec 6, T1ON, R16E, UM 12. PEP. MIT NO. ' 76-82 ,' 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE. CASING AND CE!VIENTING JOBS INCLUDING DEPTH SET AND VOLLrMES USED, PER/~ORATIONS, TESTS A1N-D E.ESULTS. FISHING JOBS. JU'NK IN HOLE A_ND SIDE-TR.~CKED HOLE AND A_NY O'I~{ER SIGNIFICANT CI'-IA.NG~ IN HOL]~ CONDITIONS. Spudded well @ 0600 hrs 12-17-76. Drld to 921'. Circ broke around outside of 20" conductor. Cmtd w/170 sx cmt. CO 10' cmt inside 20". Drld 17½" hole to 1200'. No returns outside 20". Drld 17½" hole to 2750'. Ran 13- 3/8" 72# N-80 butt cst w/shoe @ 2726', collar @ 2648'. Cmtd 13-3/8" cst w/6400 sx Arcticset cmt mixed w/0.3% D13R, slurry wt 15.2 ppg. Floats held OK. ND 20" Hydril. Installed & press tstd cst spool & pkoff to 2000 psi. NU & press tstd BOPE. Drld FC, cmt, & float shoe @ 2726'. Drld 10' new form, press tstd form to 500 psi OK. Drld 12¼" hole to, 2800'. PU Turbo Drill & drld to 3115'. PU BHA & had drld to 7390' as of December 31, 1976. RECEIVED JAN ,, , o:. , NOTE--Report on this form i$ required for e=ch colendor monf ~ reg rdl ss o t slofus of O'perofion$, end must be filed in dupli¢ote wifl~ the oil and gas conlervatlon committee by the 15th of the succeeding month, unlem~ otherwise directed. BP ALASKA INC. 31 1 1 - C - STREET · TELEPHONE (907) 279-0644 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99504 Attention: Mr. Hoyle Hamilton Acting Director MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 October 28, 1976 C. E,NG . . _._ ~ ~' "7.',4_ i -j' 'Di.:/;,r:t C:O NF E iR: ............... , __ FILE: Gentlemen: Drill Site 9-10 (11-6-10-6) Prudhoe'Bay Field We have reviewed a copy of Atlantic Richfield Company's Application of Permit to Drill the subject well from a surface location of 25'E and 1581'N of the SW cr Sec. 1, T10N, R15E, UM to an 8800' subsea target 1320'S and 1320'E of the NW cr Sec. 6, T10N, R16E, UM. We understand the well is projected to be 1300'S, 1374'W of SW cr of BP Alaska Incorporated's lease ADL 28343 at TD. BP Alaska Incorporated being the affected operator as per Paragraph 22.050, Title II, Part 3 of the Alaska Administrative Code, has no objection to the drilling of this well. Very truly yours, BP ALASKA INC. Go Do~~ Manager Operations GDT: PRJ: j le cc: Atlantic Richfield Company DEV-PB-07 2/2 · ~ VVell 7 71 Well 8 0.0' Well 9 25'_ ~Well I0 ~'We I I [I SECTIONII SECTION 12 CERTIFICATE OF SURVEYOR t HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPEP~VISlON, AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. SEPT. 29~ 1976 ~.~ DATE OF SURVEY FOR WELLS 10 -- . DATE OF SURVEY SURVEYOR BUILT WELL No. 7 LAT. 70° 14' 52.613'' LONG. 148© 14' I0 146" W ELL No. 8 LAT. 70°14'51.460'' LONG. 148°14' 09,433'' WELL No.9 LAT. 70° 14'50.304" LONG. 148°14'08.723'' WELL ' I0 I.AT. 70© 14' 49.145" LONG. 148© :4' L)7.987" ~NELL [AT. LONG 7~F:,4' 4Z992" 48~ 14' 07.270" Y 5 943 399.24 X 718 315.12 Y 5 943 282.76 X 718 343.04 Y 5 943 165.96 X 718 370.86 'I 5 94:~ ,048 88 .~, ,', ¢ ,')gL) 55 942 932 43 '?18 427.64 · EXISTING WELL OR CONDUCTOR PIPE 10-4-76 ADD WELLS lO& Fl OD DATE REVISION CK ARCO No. HVL No. :35-DS9-76 ATLANTIC RICHFIELD CO. AS BUILT DRILL SITE No.9 WELLS No. 7,8 8[ 9 LOCATED IN PROTRACTED SECTION 2, T. IO N.~ R.15E.~ U. M. PREPARED BY HEWITT V. LOUNSBURY 8 ASSOC. 723 W. 6th AVE., ANCHORAGE~ ALASKA DATE 18 JUNE 76 SCALE I": 2~00' _~ CHKD BY GD FIELD BK [.00SE LEAF Conservation ~4ovember 1, 1976 Re: Prudh~ Bay DS 9-10 (11'6-10-16) Atlantic Richfield Company State Per~'it ~. 76-82 M, l~ag~er Senior ~illing Engineer Atlantic Richfield Co, any P. O. Box~ Anchorage, Alaska 9~10 Dear Sir: 'Enclosed is the approved application for permit to drill the above referenced well at a location in Section 6, Township lOH, Range 16E, U. M. gell samples, core chips and a mud log are not required. A directional survey is required. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Depart- ~nt of Fish and Game. Pollution of any waters of the State is prohibited by_AS 46, Chapter 03, Article 7 and the regulations promulgated thereunder {Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commenci~ operations you r,~ay be contacted by a representative of the Department of Environnental Conservation. Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded, t~e would also like to be notified so that a representative of the Division .may be p. resent to witness testing of bl'o~out preventer equipment before surface casing shoe is drilled. H. ~ggoner' -2- November 1, 1976 In the event of sus~s!on or abandonment please glve this offtce adequate adv~e ~ttftcatiou so t~t ~ may have a witness present. Very t~ly. yours, · ~? ~' - ~ ~yl ~/=H. H~mi'ltcm Chat~ A]as~ Oil and Gas ~nservatton C~lttee Enclosure CC: Department of Fish and Game, Habitat Section w/o encl. Department of Envi~nmental Conservation w/o encl. Deparbnent of Labor, Supervisor, Labor Law Compliance Division w/o encl. Atlanti,.cRichfieldCompany North Arnericsn Producimg Division North A~as,V'~ ~strict Post Office ~ 360 Anchorage, Alask~ 995~0 Telephone 907 277 5637 October 20, 1976 Mr. Hoyl e Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-10 Dear Mr. Hamilton: Enclosed herewith is our Application for Permit to Drill DS 9-10, a $100.00 filing fee, and the required survey plat. Very truly yours, C' R' Know~D f°r~ District Drilling Engineer /jw Enclosures Form 10-401 REV. 1-1~7! SJJBMIT IN- TI ;,~TE : .... f - ~ ~ (Other in.~iructlu.s o~ STATE OF ALASKA ~-,;~ ' ~ OIL AND GAS CONSERVATION COMMI~T~E'.;~ : la. TYPE OF WORK b. TYPE OF WELL OIL WELL ~] PERMIT TO DRILL OR DEEPEN DRILL r')q DEEPEN [-'-] '~'~"'"'"" GAS SINGLE MULTIPLE WELL [~ OTHER ZONE [~] ZONE L_] 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, ^nchorage, Alaska 4. LOCATION OF WELL At surface 13. 99510 25'E & 1581'N of SW cr Sec l, TION, R15E, UM At proposed prod. zone 1320'S & 1320'E of NW cr Sec 6, TION., RI6E~ UM DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 6½ miles northeast of Deadhorse, Alaska API No. 50-029-20235 6. LEASE DESIGNATION AND SERIAL NO. ADL 28345 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAbIE Prudhoe Bay 9. WELL NO. DS 9-10 (11-6-10-16) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit Poe 11.SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 6, T1ON, R16E 1~. 14. BOND INFORMATION: TWE Statewidesu~et~a~d/orNo. Federal Insurance Co. 8011-38-40 ~mo,n, 100,000.00 15. DISTANCE FROM PROPOSED * [ 16..No. OF ACRES !N LEASE 17. NO,ACRES ASSIGNED LOCATION TO NEAREST 0 ' ] 2' TO THIS WELL PROPERTY OR LEASE LINE, FT. 13 O' 560 320 (.Mso to nearest drig, unit, if any) 18.DISTANCE FROM PROPOSED LOCATION 119. PROPOSED DEPTtl . 20. ROTARY OR CABLE TOOLS TO NEAREST WELL DRILLING, COMPLETED, I OR APPLIED FOR, FT. 3734 [9254'TVD, 1 3024'MD Rotary 21. ELEVATIONS (Show whether DF, RT, CR, etc.) . , . 22. APPROX. DATE WORK WILL START 21' Pad Elevation (Gravel) December 31, 1976 23. PROPOSED CASING AND CEbIENTING PROGRAM , , SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE sETTING DEPTH Quantity of ce,ment 20" 94# H-40 lO0'+ ~.irc to surf aDDrOX 500 SX · , . ..17½ 13-3/8 72# N-80 2700'+ Circ. to surf approx 5500 sx 12~ 9-5/R 47~ N-RO 120Z5'+ ?SO0'+.cmf__ CO!limn On !st stan~ l( , g .q00-9.5. 300'+ cmt on 2nd stage ~?~+ sx · 8½ 7" 29# N-80 12773' 1200~- thru lap 300sx + - e ! O00+s,' Atlantic Richfield Company proposes to directionally this well to 13025'+MD, 9254'+TVD to produce the Sadlerochit zone. Logs will be run across selected intervals. A 20-3/4" 2000 psi Hydril will be used on the 20" conductor. A 13-5/8" 5000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/8" casing. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5½" 17# N-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. The well will not be perforated at this time. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen dixectionally, give pertinent data on subduxface locations and measured and true ,~ vTtical depths. Give blowout preventer program. 24. ~'~/~or~ing is T ..... dC ..... t SJGNED///~Ld~~ DATE /~'''~ '"' ~ '"' ~ TITLE ~- Thlss~a~cef~r ~teo£ficeuse90 i ' v s a ) (,~ CONDITIONS OF APPROVAL, IF ^NY: ! SAMPLES AND CORE CItIPS REQUIRED IMUD LOG [] YES E~ No I [] YES E~ NO DIRECTFIONAL SURVEY REQUIRED YES [] NO OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE 50-029-20235 PERMIT NO. APPOVED BY 76-82 APPROVAL DATE '~~~-,~ ,,.~~X-.~TITLE Chairman '~ ' / ' *See Instruction On Reverse Side November l, 1976 DATE November 1, 1976 October 19, 1976 Mr. Hoyl e Hamil ton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' Drill Site 9-10 (11-6-10-16) Prudhoe Bay Field Dear Mr. Hamilton' We have reviewed a copy of Atlantic Richfield Company's Application of Permit to Drill the subject well from a surface location of 25'E & 1581'N of the SW cr Sec 1, TION, R15E, UM to an 8800' subsea target 1320'S and 1320'E of the NW cr Sec 6, TION, R16E, UM. We understand the well is projected to be 1300'S, 1374'W of SW cr of BP Alaska, Incorporated's lease ADL 29343 at TD. BP Alaska, Incorporated being the affected operator as per Paragraph 22.050, Title II, Part 3 of the Alaska Administrative Code, has no objection to the drilling of this well. Very truly yours, P. R. Judd BP Alaska, Inc. North Alaska¢~!strict Post Office ~' 380 Anchorage, A,,a$~<a 99510 Telephone 907 277 5537 October 19, 1976 Mr. P. R. Judd BP Alaska, Inc. P. O. Box 4-1379 Anchorage, Alaska 99509 Subject' Drill Site 9-10 (11-6-10-16) Prudhoe Bay Fi eld Dear Mr. Judd' We propose to drill the subject well from a surface location of 25'E & 1581'N of SW cr, Sec 1, TI ON, R15E, UM to a 8800' subsea target of 1320'S and 1320'E of NW cr Sec 6, TION, R16E, UM. At TD the well is projected to be 1300'S, 1374'W of SW cr of BP lease ADL 29343. Atlantic Richfield will drill and operate the well. Attached is a copy of State Form 10-401, Application for Permit to Drill. Under Paragraph 22,050, Title II, Part 3, of the Alaska Administrative Code, you are classified as an affected operator as far as the proposed well is concerned. Before the State of Alaska Oil and Gas Conservation committee can approve our application for a permit to drill this well, a letter of non-objection from BP Alaska is required. We would be grateful if you would give this matter your earliest attention and if you are in agreement, sign the enclosed letter and transmit it to the Alaska Division of Oil and Gas at your earliest convenience. Very truly yours, C: R: Knoggw~ District Drilling Engineer CRK/jw Enclosures cc' State of Alaska Division of Oil and Gas CHECK LIST FOR NEW 'WELL PER,.tiTS · Is 'the permit fee a~L.hed . · Is 'well to be locau~d tn a defined pool Company Yes~ rio Remarks Lease & Well Is a registered survey plat attached Is Well located o~'o~,~r dista = ,,, .x~ rice from properuy line Is well located p=o~,e'r dista~c~ from other wells ts sufficient undedi~=~ted acreage available in this pool Ts ',..'ell to be de,.,iated -ffecte~ p~rty Is operator the only ~ _ Can permit be approved before ten-day wait . Does operator have a bo.qd in force ts a conservation o,~r needed . · · Is aL,:;]n,strative ap royal needed Is conductor string?,~-~vided ..... IS enouqh ceF, ent used to circulate on conductor and surface = ' ~ ~ ~rmediate or production strines Will cement tio in sur?a~e and. in~= ' ~ ' ~ Cfi V Z v;~il cement cova.,~ a~: xn..v,,n produ e ,q~, ns !.,~i~l surface casinq ,..,, ~. ec shv,, Will all -asino ei,,,e adecua~o safe~-,~ ' ns , u'~ , . _ . .~ ~_~' in col ,apse. te ion & h , st Does BO?E have suf=icient pressure ratin9 :i ,tiona] Requirements-