Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
176-083
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, November 24, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Brian Bixby P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 04-06 PRUDHOE BAY UNIT 04-06 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 11/24/2023 04-06 50-029-20111-00-00 176-083-0 W SPT 7954 1760830 1988 1646 1645 1645 1644 431 502 538 583 4YRTST P Brian Bixby 10/10/2023 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 04-06 Inspection Date: Tubing OA Packer Depth 825 2387 2369 2366IA 45 Min 60 Min Rel Insp Num: Insp Num:mitBDB231011071446 BBL Pumped:2.8 BBL Returned:2.8 Friday, November 24, 2023 Page 1 of 1 MEMORANDUM State of Alaska Permit Number: 176-083-0 Alaska Oil and Gas Conservation Commission TO: Jim Regg 10P 41q DATE: Thursday, October 17, 2019 P.L. Supervisor' r� SUBJECT: Mechanical Integrity Tests Packer Depth Pretest Initial HP Exploration (Alaska) Inc. Well 04-06 FROM: Jeff Jones PRUDHOE HAY UNIT 04-06 Petroleum Inspector I 7954 ' Tubing Ste: Inspector 1355 - Reviewed By: 1351 - P.I. Supry �� NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 04-06 API Well Number 50-029,20111-00-00 Inspector Name: Jeff Jones Permit Number: 176-083-0 Inspection Date: 10/7/2019 ' Insp Num: miU1191009090112 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 04-06 IType Inj I w JTVD I 7954 ' Tubing 1357 - 1355 - 1352 - 1351 - PTD 1760830 Type Test SPT 'fest psl 1988 IA 593 2298 2281 2277 ' BBLPumped: 3.5 `BBL Returned: 32 - OA 53 105 - 1D2 - 128 " Interval 41RTST p/F P Notes: OOA 0 PSI throughout test. 1 well inspected, no exceptions noted. ' Thursday, October 17, 2019 Page I of 1 • l'"(Co-Ods P5V o f—bCo Loepp, Victoria T (DOA) From: Quick, Michael.) (DOA) Sent: Sunday,April 23, 2017 9:35 AM To: Foerster,Catherine P(DOA); Loepp,Victoria T(DOA); Schwartz,Guy L(DOA);Wallace, Chris D (DOA); DOA AOGCC Prudhoe Bay Subject: Fwd: NOT OPERABLE: Producer 01-03 (PTD#1952040) McEvoy Generation 1 Wellhead Follow Up Flag: Follow up Flag Status: Flagged ScANNE jy'i it a ' FYI. BP identified and shut in 5 wells with the same wellhead that is on 02-03 from the well control event last week. Begin forwarded message: From: "AK,GWO SUPT Well Integrity"<AKDCWeIIIntegrityCoordinator@bp.com> Date:April 23,2017 at 7:08:55 AM AKDT To: "AK,OPS FS1 OSM"<AKOPSFSIOSM@bp.com>,"AK, OPS FS1 Facility OTL" <AKOPSFS1FacilityOTL@bp.com>, "AK,OPS FS1 Field OTL"<AK OPSFS1FieldOTL@bp.com>, "AK, OPS FS1 DS Ops Lead"<AKOPSFS1DSOpsLead@bp.com>, "AK,OPS FS1 DS1 Operator" <AKOPSFS1DS1Operator@bp.com>,AKOpsProdEOCTL<AKOPSPCCEOCTL@bp.com>, "Cismoski, Doug A" <CismosDA@BP.com>,"Daniel, Ryan"<Ryan.Daniel@bp.com>, "AK, RES GPB West Wells Opt Engr" <AKRESGPBWestWellsOpt@BP.com>, "AK, RES GPB East Wells Opt Engr" <AKRESGPBEastWellsOptEngr@bp.com>, "AK,OPS EOC Specialists"<AKOPSEOCSpecialists@bp.com>, "AK,OPS PCC Ops Lead"<AKOPSPCCOpsLead@bp.com>, "AK,OPS Prod Controllers" <sewellcr21@bp.com>, "G GPB FS1 Drillsites"<ggpbfs1drillsites@BP.com>, "Oestgaard, Finn" <Finn.Oestgaard@bp.com>, "'Regg,James B(DOA) (jim.regg@alaska.gov)' (jim.regg@alaska.gov)" <jim.regg@alaska.gov>, "michael.quick@alaska.gov"<michael.quick@alaska.gov> Cc: "AK,GWO DHD Well Integrity"<AKD&CDHDWelllntegri@bp.com>, "AK,GWO Projects Well Integrity"<AKDCProjectsWelllntegrityEngineer@bp.com>, "AK,GWO Completions Well Integrity" <AKDCWLCompletionsSupt@bp.com>, "AK,GWO Well Integrity Engineer" <AKGWOWeIISiteEnginee@bp.com>, "AK, GWO SUPT Well Integrity" <AKDCWellIntegrityCoordinator@bp.com>, "AK,OPS FF Well Ops Comp Rep" <AKOPSFFWeIlOpsCompRep@bp.com>, "chris.wallace@alaska.gov' (chris.wallace@alaska.gov)" <chris.wallace@alaska.gov>, "AK,GWO SUPT Special Projects" <akdcWellservicesoperationssuperintendent@bp.com>, "Kilfoyle,Jeffery A"<Jeffery.Kilfoyle@bp.com>, AKIMS App User<akimsuser.service@bp.com>, "Dempsey, David G"<David.Dempseyl@bp.com>, "Hibbert, Michael"<Michael.Hibbert@BP.com>, "Janowski, Carrie"<Carrie.Janowski@bp.com>, "Montgomery,Travis 1"<Travis.Montgomery@bp.com>, "Munk,Corey"<Corey.Munk@bp.com>, "Obrigewitch, Beau"<BEAU.OBRIGEWITCH@bp.com>, "Pettus,Whitney"<Whitney.Pettus@bp.com>, "Sternicki,Oliver R"<Oliver.Sternicki@bp.com>,"Worthington,Aras J"<Aras.Worthington@bp.com> Subject:NOT OPERABLE:Producer 01-03(PTD#1952040)McEvoy Generation 1 Wellhead All, Producer 01-03(PTD#1952040)has a McEvoy Generation 1 wellhead.While the cause of the unplanned release on well 02-03 is investigated,all other wells in GPB with this wellhead must be shut in.01-03 is reclassified as Not Operable. The complete list of affected wells is as follows: 1 • • • 01-03 • 01-06 • 04-01 • 04-05 • - 6 Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) 0:(907)659-5102 C:(907)943-0296 H:2376 2 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission ,l3 DATE: Wednesday,October 28,2015 TO: Jim Regg P.I.Supervisor'Ve ( l (IC SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 04-06 FROM: Jeff Jones :r •; i PRUDHOE BAY UNIT 04-06 same ��© Petroleum Inspector JUL. 0 c i l l r, Src: Inspector Reviewed By P.I.Supry J r)(2— NON—CONFIDENTIAL (2—NON—CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 04-06 API Well Number 50-029-20111-00-00 Inspector Name: Jeff Jones Permit Number: 176-083-0 Inspection Date: 10/18/2015 Insp Num: mitJJ151020163226 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well T 04-06 - Type Inj j W' TVD 7954 Tubing 996 - 997 - 998 , 998 - PTD I 1760830 Type Test SPT Test psi 1988 - IA 144 2500 - 2489 - 2487 Interval14YRTST 1P/F P v OA 36 • 44 - 48 • 54 • — 1 — L Notes: 3.9 BBLS diesel pumped. 1 well inspected,no exceptions noted. Wednesday,October 28,2015 Page 1 of 1 vL04 -0 / 1-7O3O Regg, James B (DOA) From: AK, OPS FF Well Ops Comp Rep [AKOPSFFWellOpsCompRep @bp.comj Sent: Tuesday, June 04, 2013 12:01 PM To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay X6(6 6(A I3 Subject: FW: PBU/East Area/FS2/04 defeated pilots Mr. Regg, Here is the info you requested on the DS-4 water injectors that were temporarily SI yesterday for pigging operations. Well PTD 04- 1760830 04-08 1760100 04-10 1760420 04-13 1780310 04-15 1780370 04-19 2012180 SCANNED 04-20 1831190 9 4. 04-25 1860490 04-27 1852950 04-45 1940340 I apologize for the time delay since the initial email was sent. I will have this data available for future notification emails since I now know it is required. Thank you, Lee Hulme From: AK, OPS FS2 DS Ops Lead Sent: Tuesday, June 04, 2013 8:35 AM To: AK, OPS FF Well Ops Comp Rep Cc: AK, OPS FS2 Facility OTL; AK, OPS FS2 OSM Subject: RE: PBU/East Area/FS2/04 defeated pilots Lee, All of the PWI wells are gagged during pigging a eratio_ns in order to prevent inadvertent blocked flow and a stuck pig.— This is how we always pig and how we will always pig every week in the future. It is a manned operation. The wells gagged yesterday were DS4-6,8,10,13,15,20,25,27,19,45. cRo,z White Ak, Ops FS2 DS Lead 907-659-5493 Alt: James Barndt From: AK, OPS FF Well Ops Comp Rep Sent: Tuesday, June 04, 2013 7:43 AM To: AK, OPS FS2 DS Ops Lead Cc: Regg, James B (DOA); Redmond, Randy; AK, OPS FF Well Ops Comp Rep 1 Subject: FW: PBU/East Area/FS2/04 defeated pilots Importance: High Ron, Please supply me with a list of the water injectors on DS-04 that were defeated during the pigging operations yesterday so I can look up the PTD numbers and pass on to Mr. Regg. Thanks, Lee From: Regg, James B (DOA) [mailto:jim.regg(aalaska.gov] Sent: Monday, June 03, 2013 9:08 PM To: AK, OPS FF Well Ops Comp Rep Subject: RE: PBU/East Area/FS2/04 defeated pilots Our approvsl only covers injectors. And yes, I want a record of the injectors involved. Particularly since it is DS 4. Sent from Samsung Mobile Original message From: "AK, OPS FF Well Ops Comp Rep" <AKOPSFFWellOpsCompRepnbp.com> Date: 06/03/2013 6:32 PM (GMT-09:00) To: "Regg, James B (DOA)" <jim.regg(cr�alaska.gov> Subject: RE: PBU/East Area/FS2/04 defeated pilots Mr. Regg, I just called the FS2 Field Lead Tech and he told me the pigging operation is completed and the temporary defeat for PWI wells has been lifted. It will take some research to determine which wells were involved since the DSD log blanketed the whole pad. I can get this data tomorrow if you still want it. Please advise. Lee Hulme FF Well Ops Compliance Rep BP Exploration (Alaska) Inc. Office: (907) 659-5332 Cell: (907) 229-5795 Harmony-7187 (Alternate: Ryan J Hayes) From: Regg, James B (DOA) [mailto:jim.re•g@thalaska.gov] Sent: Monday, June 03, 2013 5:01 PM To: AK, OPS FF Well Ops Comp Rep Subject: RE: PBU/East Area/FS2/04 defeated pilots Please identify wells and PTD for each. Jim Regg AOGCC 2 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 From: AK, OPS FF Well Ops Comp Rep [mailto:AKOPSFFWellOpsCompRep(abp.com] Sent: Monday, June 03, 2013 4:25 PM To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay Cc: Redmond, Randy; AK, D&C Well Integrity Coordinator; Bill, Michael L(ASRC); Starck, Jennifer L; AK, OPS FS2 OSM; AK, OPS FS2 Facility OTL; AK, OPS FS2 DS Ops Lead; AK, RES GPB East Wells Opt Engr Subject: PBU/East Area/FS2/04 defeated pilots Dear Mr. Regg, Per AOGCC waiver dated 3/11/13, PBU Oil Pool Low Pressure Water Injectors, BPXA is providing notification that wells on DS-04 are now operating with its SVS defeated as of 6/3/13 for pigging operations. Per the wavier, BPXA has tagged and logged the defeated components, and will notify AOGCC once the SVS is returned to service. Please contact me with any questions. Thank you, Lee Hulme FF Well Ops Compliance Rep BP Exploration (Alaska) Inc. Office: (907) 659-5332 Cell: (907) 229-5795 Harmony-7187 (Alternate: Ryan J Hayes) 3 • MEMORANDUM • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, December 16, 2011 TO: Jim Re P.I. Supeer � � (1 / t 71 ZZ i l+ S UBJECT: M echanical Integrity Tests BP EXPLORATION (ALASKA) INC 04 -06 FROM: Lou Grimaldi PRUDHOE BAY UNIT 04 -06 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry L. NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 04 - 06 API Well Number: 50 029 - 20111 - 00 - 00 Inspector Name: Lou Grimaldi Insp Num: mitLG1 1 1 130142708 Permit Number: 176 -083 -0 Inspection Date: 11/30/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 04 -06 - Type Inj. W TVD 7954 - IA 490 2500 - 2490 2490 P.T.D 1760830 ' TypeTest SPT Test psi 2500 - OA 186 142 152 290 Interval 4YRTST p/Fi P _ Tubing 784 784 783 783 Notes: 3.7 Bbl's pumped, 3.0 returned. Good solid test. OA gauge port was found to be frozen at end of test. Last reading is what casing pressure was during test. SLAMEOFEB 1 € Zl: 6i Friday, December 16, 2011 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, December 14, 2011 TO: Jim Regg �� � (Z +(z (l SUBJECT: Mechanical Integrity Tests P.I. Supervisor I BP EXPLORATION (ALASKA) INC 04 -06 FROM: Lou Grimaldi PRUDHOE BAY UNIT 04 -06 Petroleum Inspector Src: Inspector Reviewed B : P.I. Supry NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 04 - 06 API Well Number: 50 029 - 20111 - 00 - 00 Inspector Name: Lou Grimaldi Insp Num: mitLG111130142708 Permit Number: 176 - 083 - Inspection Date: 11/29/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 04 -06 - Type Inj. W TVD 7954 ' IA 490 , 2500 , 2490 2490 - P.T.D 1760830 'TypeTest SPT Test psi 2500 ' OA 186 142 152 290 Interval 4YRTST p/F P - Tubing 784 ' 784 783 783 , Notes: 3.7 Bbl's pumped, 3.0 returned. Good solid test. OA gauge port was found to be frozen at end of test. Last reading is what casing pressure was during test. yvlt ree C � 4e5* (gM Wednesday, December 14, 2011 Page 1 of 1 MEMORANDUM To~ Jim Regg P.I. Supervisor ~~~~ ~ ~ ~~ ~v' FROM: John Crisp Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, December 18, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 04-06 PRL'DHOE BAY UNIT 04-06 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv_/~. ~-- Comm Well Name: PRUDHOE BAY UNIT 04-06 Insp Num: mitJCr071217101034 Rel Insp Num: API Well Number: 50-029-20111-00-00 Permit Number: 176-083-0 ;~ Inspector Name: John Crisp Inspection Date: 12/16/2007 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~ 04-06 ',Type Inj. ~ V/ ' TVD ~ 7954 ~ IA 60 4000 3960 3950 i P.T. 1760830 iTypeTest ' SPT i TCSt pSl i 1988.5 QA ; 30 ~ t00 ~ 100 130 + ~{(~_ Interval 4YRTST P~F P Tubing 980 980 ~ ~ 980 ~ 980 -! Notes' 7 bbl's pumped for test. r(~,~ ~~,,yy i,,`\ ~~}} ~1J~~6'D~~ .1t-il~ .~ ~ nrrQQ ~UUt' Tuesday, December l8, 2007 Page 1 of 1 Scblulllblrger REC; D NO. 3748 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Alaska O¡lt& Field: Prudhoe Bay WI! J b# L D D t CI CD 'f BL '7fD-O~ e 0 oa eSCrlDtlOn ae oor 06-02 10715379 MEMORY PRODUCTION PROFILE 01/26/04 1 04-06 10672293 INJECTION PROFILE 08/07/03 1 03-31 9153242 PRODUCTION PROFILE 02/05/03 1 03-29 10866560 PRODUCTION PROFILE 07/30/04 1 02-29A 10563072 LDL 06/22/03 1 01-34 10563167 SBHP SURVEY 06/05/03 1 01-25 10889226 LDL 04107/05 1 01-24A 10772257 SCMT 05/11/04 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth \ ~~; .... - 03/27/06 e e Page 8 Revised 4J14188 I I f' r f ~ r l " " ~ .: ,- f '-' t t ... '-' J ....ested on Rig .*1" to 4153". TUBING PACKER TEST LAST TEST WEU ANNULUS FLUIÐ SIZE MD"/TVO' CASING PRESS. DATE ,/ 2D bbI diøse6 + 10,4 CaCI2 5-112"' 10487/7834 9-SlB"' 41_ UN-80 1500 1/8/88 4-6 .12-2 ...... DÍØBi81 7- 11673J8464 9-518·, 47.. l-80 3064 2/28188· 12-27 '" 105 bb] d"1eSB1 + 3.5 NaC1 5-1/2- 8900/839'" 9-518-, 47. l-80 2505 1/1188· ./ 51 bb& diøse/. + 8.5 NaCl .. .. 87Q5-8482 9-518., 47.. l..eo NSCC to 2200", N-ao to 7084' 2493 3J30188 9·18 9-19./ 9B bbf diesel + 8.5 NaO 5-1/2- 11051/8688 9-518-, 47'. 800--95 to 2320". N-80 10 9446' - 2565 2/11/88- 1 6-1 6 ./ 16 bbI diese' + 8.6 NaCf 5- 112- 9828J8438 9-518·, 47', L-BfJ 2423 3/8188· l2-10 v DÍ86Ø( 2-718 - 9569/8575 9-518·, 47' L-BO 3104 3/6/88 t2-1 G V" 68 bbI diø8et + 8.5 NaC& 3-1/2- 10293(8535 7-518-. 29. n L-80 2508 3/6/88 L2-24 .,- Crude 2-718"' 9540/8506 9-518"', 47. L-80 2815 3/29/88 V' NGI-6 51 bb6 d~ + 9.4 NaCI 7- 8066/7426 9-5/8-. 47' MN-80 1950 2/8/88 - 5-11T below W \tJ LV (J) rn z - ttI -< D :;:r \. C 1: , t: a.. :r CJ I'\) t:r: ÇlI u: IT C (" .. (J I 1\ I a a .... p. '"' :] . ~) IJ !AI fY) Dc o \ ....st r- -- STATE ANNULUS TES71NG DATABASE FOR PRUDHOE/LISBURNE INJECTION WELLS 1988 ANNULAR TESTS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_ Converted to WAG Well Pull tubing _ Alter casing _ Repair well _ Other_X Converted to WAG 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__ RKB 64 feet 3. Address Exploratow__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__X Prudhoe Bay Unit 4. Location of well at surface 8. Well number 626' FNL, 444' FEL, Sec. 34, T11 N, R15E, UM (asp's 712405, 5951234) 04-06 At top of productive interval 9. Permit number / approval number 1130' FNL, 1542' FEL, Sec. 03, T10N, R15E, UM (asp's 709284, 5945361) 176-083 At effective depth 10. APl number 1390' FNL, 4087' FEL, Sec. 03, T10N, R15E, UM (asp's 708943, 5945091) 50-029-20111-00 At total depth 11. Field / Pool 1389' FNL, 4128' FEL, Sec. 03, T10N, R15E, UM (asp's 708902, 5945038) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 12315 feet Plugs (measured) Tagged PBTD @ 12210 CTMD (Ju1-16-2002) true vertical 9129 feet Effective depth: measured 12210 feet Junk (measured) true vertical 9048 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 94' 20" 476 sx Fondu 118' 118' Surface 2167' 13-3/8" 700 sx PF II, 500 sx PF 2191' 2191' Intermediate 8185' 9-5/8" 800 sx Class 'G', 250 sx 11067' 8209' PF 'C' Liner 1577' 7" 364 sx Class 'G' 10728' - 12305' 7986' - 9119' Perforation depth: measured Open Perfs 11877'-11895', 11897'-11915', 11917'-11935', 11937'-11953', 12117'-12127', Open Perfs (continued) 12134'-12143', 12149'-12184', 12190'-12215'. Sqzd Perfs 11652'-11672', 11678'-11698', 11716'-11770', 11788'-11857', 11965'-11973', Sqzd Perfs (continued) 11987'-11994', 12001'-12008', 12039'-12082', 12095'-12111' true vertical Open Perfs 8792'-8806', 8807'-8821', 8822'-8836', 8838'-8850', 8976'-8984' Open Perfs (continued) 8989'-8996', 9001'-9028', 9033'-9052' Sqzd Perfs 8624'-8639', 8643'-8658', 8671'-8711', 8725'-8777', 8859'-8865' Sqzd Perfs (continued) 8876'-8881', 8887'-8892', 8916'-8949', 8959'-8971' Tubing (size, grade, and measured depth) 7", 26#, L-80, TBG @ 10666' MD; 7" x 5-1/2" XO @ 10666'; 5-1/2", 17#, L-80, TBG @ 10694'; xo Packers & SSSV (type & measured depth) 9-5/8" x 5-1/2" Baker 'FB-I' Perm Packer @ 10674'. I~C ~.. L IV I.- ,.- 7" Camco BAL-O SSSV Nipple @ 2207' MD. ,,,.,,,., 13. Stimulation or cement squeeze summary NOV 0 Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure j~,,~ 0[~'& Ga~ ~'~011s. C0~1~01'~ 14. · Representative Daily Averaqe Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 06/08/2002 14820 1499 Subsequent to operation 08/08/2002 31124 3171 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __ Gas __ Suspended _ Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~~..~~~i.~ Title: Technical Assistant Date September 24. 2002 · Prepared by DeWayne R. Schnorr 564-51.,7..~ Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE ~'~'~ 06/10/2OO2 O6/3O/2OO2 O7/O7/2OO2 07/14/2OO2 07/15/2OO2 07/16/2002 07/16/2002 08/06/2002 10/23/2002 06/10/02 06/30/02 07/07/02 07/14/O2 07/15/O2 07/16/02 O4-O6 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS SCMOO-B-GONE--SBG: SCMOO-B-GONE SCMOO-B-GONE--SBG: TUB]:NG WASH / PTCKLE SCMOO-B-GONE--SBG: DR]:FT/TAG FTLL CLEAN OUT: F]:LL CLEAN OUT; SCMOO-B-GONE F]:LL CLEAN OUT: SSSV C/O OR STROKE; F]:LL CLEAN OUT; SCIvlOO-B- GONE F]:LL CLEAN OUT: FTLL CLEAN OUT; SCMOO-B-GONE F]:LL CLEAN OUT: SCMOO-B-GONE F]:RST DAY OF MT ]:N.1ECT]:ON TESTEVENT --- ]:nj Press, psi: 3,305 Type: M]: Vol: 23,769 EVENT SUMMARY SBG TREATMENT 282 BBLS OF SBG PUMPED DOWN TUBING VIA MANIFOLD BUILDING. FREEZE PROTECT HOT OIL UNIT AND MANIFOLD BUILDING STAND PIPE WITH 10 BBLS OF METHANOL. DISPLACE TUBING WITH 14.7 BBLS 50/50 METHANOL WATER. TUBING PRESSURE UP TO 4600#. DRIFT TO 2210' SLM, TOP OF SSSV W/4.5" CENT SB .... ATTEMPT TO RUN 4.5" CENT W/121" FLAPPER CHECK TOOL AND SET DOWN @ 1795' SLM--- RAN 4.5" CENT 5' STEM, 1 3/4"SB TO 1783' SAMPLE OF IRON SULFIDE--- WELL PLUGGING OFF--- RDMO .... LEAVE WELL SHUT IN FOR CTU CLEAN OUT-- MIRU DS CTU# 8. HOLD PJSM. PRESSURE TEST ALL LINES AND VALVES TO 4000 PSI. BLEED 2900 PSI OFF WELL. PUMPED 65 BBLS DOWN WELL AND PRESSURED UP. RIH JETTING WITH 800 PSI ON BS. TAGGED FILL @ 1700'. CLEANED OUT TO 2210'. PUMPED 5 BBLS BIO SWEEP. POOH @ 80%. RD COIL UNIT AND BACK IN S/L UNIT TO PULL SSSV. WAIT ON SLICKLINE TO PULL SSIV. RAN 5.93 GAUGE RING AND PULLED 7" WRDP-2 SSSV FOR FILL C/0. RD S/L. RU COIL UNIT AND PERFORMED WEEKLY BOP TEST. OPENED WELL WITH 3400 PSI. BLEED OFF GAS CAP TO TIGER TANK TO 1300 PSI. PUMPED 32 BBLS DOWN WELL AND PRESSURED UP TO 2200 PSI. OPENED WELL DOWN WELL 04-05 FL AND BLEED OFF WELL PRESSURE TO 800 PSI. RIH WITH COIL. START JETTING @ 2200'. RIH JETTING @ 10600'. CONTINUED ON WSR 07/16/2002. CONTINUED FROM WSR 07/15/2002. RIH JETTING TO PBTD @ 12210' CTMD TAKING RETURNS TO SYSTEM. POOH JETTING AT 80%. RD DS CTU #8. TURNED WELL OVER TO HOT OIL TO PUMP SCHMOO-B-GONE TREATMENT. <<< JOB COMPLETED >>> Page I 04-06 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 07/16/02 PUMPED 430 BBLS SCHMOO-B-GONE DOWN TUBING. LET IT SOAK FOR 3 HOURS AND THEN FLUSHED WITH 356 BBLS OF WATER. FREEZE PROTECT WITH 75 BBLS 50/50 METHANOL WATER. 08/08/02 START OF MI INJECTION. 10/23/02 TESTEVENT--- IN] PRESS, PSI' 3,305 TYPE' MI VOL' 23,769 Fluids Pumped BBLS 4 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 2 TESTS) 13 METHANOL 179.7 50/50 METHANOL WATER 234 140 DEGREE FRESH WATER 2582 1% EXTRA SLICK KCL WATER 928 SCHMOO-B-GONE 5 1.5# BIOZAN 3945.7 TOTAL Page 2 GeoQuest $00 W. international Airport Road Anchorage, AK 99tS18-1199 ATTN: Sherrie NO. 9121 Company: Alaska Oil & Gas Cons Comm , Attn: Lam/Grant I 3001 Porcupine Drive Anchorage, AK 99501 11/22/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 4-16 ~.~,, .~0 ~/"'~' PROD PROFILE (11-6-94) 1 1 D.__S. 7-16 ~ WELL STATIC SURVEY (11-2-94) 1 1 D.S. 9-07 "7(~ ~ (~'-,,9(' TUBG CUT RECORD (11-8-94) 1 1 D.S. 9-30 ST 1 ~; ~-- J~-~ INJEO PROFILE (11-5-94) 1 1 D.S. 15-39 ~ ~- II ~ BOTTOMHOLE PRESS SURVEY/PDO (11-9-94) 1 1 D.S. 2-31 ~/---/~'~ ~,' LEAK DETECTION (11-11-94) 1 1 D.S. 4-26 ~.~-- ~ J ~ PERF RECORD (11-12-94) 1 1 D.S. 7-25 ~' '~--© ,~"~o PERF RECORD (11-11-94) 1 "i' D.S. 11-36 ~'L/-- ~)/~ G LEAK DETEOTION (11-9-94) 1 1 D.S. 15-41 '~j~~E~,~. , PERF REOORD (11-12-94) 1 1 ,D.S.z~5'1~41~ STATIO PRESSURE SURVEY (11-13-94) 1 1 D.S. 17-1 ~6'-' 6 5~"-~''- TUBG PATCH RECORD (11-9-94) 1 1 Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you. DATE: ¢~.~A /~.9,,,, STATE OF ALASKA ~ ALASK/~-IL A'ND~GAS CONSERVATION C ;MISSION REPORT OF SUNDRY WELL OPI:RATIONS 1. Operations performed: operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11 N, R15E, UM At top of productive interval 11130' FNL, 1542' FWL, Sec. 3, T01N, R15E, UM At effective depth 1437' FNL, 1284' SWL, Sec. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 64' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-6 9. Permit number/approval number 76-83/90-020 10. APl number 50 - 029-20111 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 12,315 feet 9127 feet Plugs(measured) None Effective depth: measured 12,200 feet true vertical 9037 feet Junk(measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 94" 20" 476 sx Fondu 2167' 13-3/8" 700 sx PF II & 500 sx PF True vertical depth 118' 118' 2191' 2191' 8185' 9-5/8" 800 sx Class G & 250 sx PF 'C' 11,067' 1577' 7" 364 sx Class G 10,728'-12,305' measured 12117'-12127', 12134'-12143', 12149'-12184', 12190'-12215' 8209' 7986'-9119' true vertical 8974'-8981',8987'-8994',8998'-9025',9030'-9050' Tubing (size, grade, and measured depth) 7"/4-1/2", L-80 tbg w/tail @ 10,791' 13. Stimulation or cement squeeze summary Intervals treated(measured) N/A 14. Packers and SSSV (type and measured depth) Baker "FB-1" pkr @ 10,674' & Camco 'BAL-O' SSSV @ 2207' Treatment description including volumes used and final pressure Representative Daily Average Pr~d~qtion or Iniection Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure No perforations Prior to well operation open to injection .... Subsequent to operation 23477 400 1388 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas __ Suspended Service Water Injection 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~/'~f¥~t~./~ ('-J~, .~/'~L./t'~ Title Sr. Area Operations Engineer Form 10-404 Rev 06/1~/88 .~[JN/nh SUBMIT IN DUPLICATE AII,Y REPORT OF WEI,L OPE]:_ .£IONS DS 4-6 Perforaging Operations: ARCO Alaska, Inc. perforated DS 4-6 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 2/10/90. The intervals perforated were the following: 12117-12127', 12134'-12143', 12149'-12184', and 12190'-12215' MD (Reference Log: BHCS dated 12/25/76). Injection water was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 2/10/90. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. Perforated 12117'-12127' and 12149'-12157' MD at 1/2 SPF, and 12134'-12143', 12157'-12184', and 12190'-12215' MD at 6 SPF (ref: BHCS of 12/25/76). SI well, POOH, and confirmed all shots fired. Rigged down and secured well. WDM: 6/14/91 STATE OF ALASKA ALASKA L AND GAS CONSERVATION C( ~ISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: operation shutdown Stimulate Pull tubing Alter casing Plugging Perforate X Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11N, R15E, UM At top of productive interval 11130' FNL, 1542' FWL, Sec. 3, T01N, R15E, UM At effective depth 1437' FNL, 1284' SWL, Sec. 3, T1 ON, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic X 6. Datum of elevation(DF or KB) 64' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-6 9. Permit number/approval number 76-83/90-662 10. APl number 50 - 029-20111 11, Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Sudace Intermediate Production Liner Perforation depth: 12,315 feet 9127 feet Plugs(measured) None 12,200 feet 9037 feet Junk(measured) Length Size Cemented Measured depth True vertical depth 94" 20" 476 sx Fondu 118' 118' 2167' 13-3/8" 700 sx PFII & 500 sx PF 2191' 2191' 8185' 9-5/8" 800 sx Class G & 250 sx PF 'C' 11,067' 8209' 1577' 7" 364 sx Class G 10,728'-12,305' 7986'-9119' measured 11877'-11954', 12117'-12127', 12134'-12143', 12149'-12184', 12190'-12215' true vertical 8789'-8848', 8974'-8981', 8987'-8994', 8998'-9025', 9030'-9050' Tubing (size, grade, and measured depth) 7"/4-1/2", L-80 tbg w/tail @ 10,791' Packers and SSSV (type and measured depth) Baker "FB-I" pkr @ 10,674' & Camco 'BAL:O',~$V @~7' ~;~ ,, 13. Stimulation or cement squeeze summary '~-~-. Intervals treated(measured) N/A ~: Treatment description including volumes used and final pressure ~S~ 0~[ 14. Re0resentative Daily Averaae ~ or Ini~ion Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 29,300 420 1050 Subsequent to operation 27,300 360 975 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil.~. Gas~ Suspended..._ Service Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,..~,.~ ~ Title Sr. Area Operations Engineer Form 10-~t0~t Rev 06/15/88 - ~ SUN/nb Date /~//?/?/ SUBMIT IN DUPLIOATE REPORT OF WEI,L OPEtL _.'IONS DS 4-6 Perforating Operations; ARCO Alaska, Inc. perforated DS 4-6 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 9/2/90. The interval perforated was the following: 11877'-11954' MD (Reference Log: BHCS dated 12/25/76). Injection water was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 9/2/90. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. Perforated 11877'-11954' at 1/2 SPF (ref: BHCS of 12/25/76). SI well, POOH, and confirmed all shots fired. Rigged down and secured well. WDM: 6/14/91 ARCO ALASKA, INC~ F',.O, BOX t00360 ANCHORAGE, ALASKA 995~(~ DATEi: 4-2:5-9 Rli:FEI;~ENCE- ARCO CASED HOI. E I=INAI_,.9 .. 2--2 4-i 2-9t 2-tS 3-25--9t ,.."~' - 5 4- 2- 9 i 4-.i S-22-"9i 4'"-6 3-24-'9i 4-24 S-24'-'9i .... 1ql~ 47 ~-20-9i. "¢-48 4-5-9t i 2-22 4--i-9i I~ 2-S3 3-2i"9i i 2-98 S-2~-9 i t 4-i 6 S-i 8-9i t 5-3 2-27-9 i i...5-3 2- ° 8- 9 i. i 5-6 4-i i COLL. AF~:/F'E::RF F'RODUCTION TBG CUI'I'FR F'ROD PI;,'OFIL. E/PITS TEHF'ERATUI:~E; STATIC TEMF:'ER'A'¥UF;:E: P I 1'$ I""R. f3DUCT I ON PACKIER GAMMA/CCL C 0 L L A Iq / P E F;.'. F" COLLAR/F'E::RF" INJECTION INJECT I ON FLUID F'ROD U Cl" ]: ON F'ITS F'ERF BREAK DOWN COI_LAR/F'ERF RLJN t, 5" I:,'.UN t, 5" RUN t, 2"&'5" R UN t , 5" RtJN i, 5 ' I:;.'.UH I , 5" RUN i, 5" RUN i , 5" F;:[JNt, 5" RUN t , 5" F< U Nt , 5" R LJN t , D" RLJN t, 5' R U1'4i , 5" I:;:!J N i , RUN i, 5" RUN t , 5 · I L..L~.-~,.>E. ,S'I[;N AND F;;ETURN i"HE AT]"ACHED COF:'Y AS F;~I:ZCEIF:'T OF: REECEIVED BY ._~ .... I'.IAVE':: A NICE DAY! SI..tARON WIL. SON ATO.-t 529 A I" L. A ;~' C A i'i C 0 A '[' L. A.? CAMCO C A M C 0 C A i,i C 0 C A H C 0 A'II_ A S I.-IRS ATL. AS A I'L. AS C A M C 0 CAMCO C A N C 0 I..I R S HRS ~:, IL. AS D I ~' T R I I..~ U 1' :1:0 N , T I..I E C 0 R R E C T E D A I::' I ~I' I::' 0 R i 4 '- t 6 I S ':~' 0'"' 0 ') o - 2 0 6 0 El STATE OF ALASKA ALASKA ..... . AND GAS CONSERVATION CC'-- AISSION APPLICA, iON FOR SUNDRY APPROVALS 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate X Other 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11 N, R15E, UM At top of productive interval 11130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 12. Present well condition summary Total depth: measured true vertical 12315 feet Plugs(measured) 9127 feet Effective depth: measured 12200 feet true vertical 9037 feet Junk(measured) Casing Length Size Cemented Conductor 94' 20" 466 sx Fondu Surface 2167' 13-3/8" 700 sx PF II & 500 sx PF Production 8185' 9-5/8" 800 sx CI 'G' & 250 sx PF 'C' Liner 1577' 7" 364 sx CI 'G' 6. Datum of elevation(DF or KB) 64 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-6i 9. Permit number 76-83 10. APl number 50 - 029-20111 11. Field/Pool Prudhoe Bay Oil Pool RECeIVeD 2 0 1990 Mea,ur.d '~-%r~ vertical depth 118' 118' 2191' 2191' 11067' 8209' 10728-12305' 7986-9119' Perforation depth: measured 11877-11954'; 12117-12127'; 12134-12143'; 12149-12184'; 12190-12215' true vertical 8789-8848'; 8974-8981'; 8987-8994'; 8998-9025'; 9030-9050' Tubing (size, grade, and measured depth) 7", 26#, L-80, IPCT@ 10666' MD; 5-1/2", 17#, L-80, IPCT@ 10694' MD; 4-1/2", 12.6#, L-80, IPCT w/tail @ 10792' MD Packers and SSSV (type and measured depth) Baker FB-2 packer @ 10674' MD; 7", Camco Bal-0 SSSV @ 2207' MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation January 199f 16. If proposal was verbally approved Oil Name of apl)rover Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed -._- Title Sr. Area Operations Engineer FOR COMMISSION LI~E ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test __ Subsequent form required 10-/'/" ORIGINAL SIGNED BY Approved Copy c. Approved by order of the Commissioner -.--/ _ Form 10-403 Rev 06/15/88 15. Status of well classification as: Gas Suspended Injector Date I Approval No.¢ ¢ ._, ~ ¢ .~ Date ', SUBMIT IN TRIPLICATE Rq7 RFK n' .I ~n~hnr ATO-147R RI-I Well 4-06i CTU Cement Squeeze/Frac Preliminary Procedure Objective: Perform a CTU cement squeeze and subsequent Frac to modify current injection profile. 1. Perform a full strength mud acid perforation wash using CTU. 2. Pack the well with filtered seawater. 3. Pump 80 bbls of cement followed by 5 bbls of fresh water and 200 bbls of biozan gel. Squeeze off the following perforations: Zone Present Interval Shot Density 4 11652-11 672 RIGSQZ 4 11678-11 698 RIGSQZ 4 11 71 6-11 770 RIG SQZ 3,2 11788-11 857 RIGSQZ 2 11 877-11 954 1/2 SPF 2 11 965-11 973 RIGSQZ 2 11 987-11 994 RIG SOZ 2 1 2001 -1 2008 RIGSQZ 2 1 2039-1 2082 RIG SQZ 2 1 2095-1 211 I RIGSQZ 2 12117-12127 1/2 SPF 1 1 21 34-1 2143 6 SPF 1 12149-12157 1/2 SPF 1 1 21 57-1 21 84 6 SPF 1 1 21 90-1 2215 6 SPF 4. Immediately jet out the diluted cement. 5. Reperforate the following intervals two days later: Zone Present Interval 1 12149-12184 1 12190-12215 6. Perform Frac on 4-6i. Other well information: Current status: Injecting Shot Density FSD LSD Expected static bottomhole pressure: 3800 psi at 8800' SS Expected fluid in wellbore at reperforation: seawater. 6 3 2 COILED TUBI.,Ni3 UNIT BOP EOU ! PHENT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RAMS 3. 5000 PSI 4 1/6" HYD~LIC SLIPS 4. 5OO0 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAkeS 6. 5000 PSI4 1/16- STUFFING BOX 3 HIREL BOP EOU! PMENT 1. 5000 PSI ?" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIRELIN[ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, INC F'.O. BOX IOOS6O ANCHORAGE, ALASKA 995i~ DATE' REFERENCE' ARCO CASED HOLE FINALS 2-4 9-29-90 PRODUCTION PROFILE · '>-i = 9-26-9n PITS '~-i 4 9--'~8-9~ F'RODUCTION PROFILE 3-27 9-27-96, ~F'INNER/'T'EMP 4-6 9-28-9~ INJECTION F'ROFILE 4-t~ 9-56,-9~ INJECTION PROFILE 6-20 9-29-90 LEAK DETECTION 7-25 t ¢'-i -90 PIT~/HPFM c,_~ 0-o8 o~ I_EAK DET[ECTION 9-28-9¢, ZNJECTZON PROFZLE R 1:-7 C E I V E D B f ~' ~ ' HAVE: A NI( ~ALI...Y HOFFECI< El:;.: ATO- i "'": · ..,-29 RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN RUN FL'. E C E I F:' T 0 F APF'ROVED ~--- TRANS,':~ 9(¢4! 3 i, i, t.. i, i, t, i, i, t; i) A T A, 5' 5" 5' 5' 5' 5' 5' 5' 5' CAMCO CAMCO c' Mco CAMCO CAMCO CAMCO CAMCO (]AMC(] C A M C 0 CAMCO CAMCO CAMCO D 12.' T R I B U T I 0 N :~ C E N T F;; A L 1"'- i L E S ~: CHEVRON D & M "'--,- EXTENq'iON,.. EXPLORATION EXXON · MARATHON ~' MOB I I. F' i"t I L L_ ;t. F:' F'B WELL FILES R & D BPX STAI'E OF ALASKA TEXACO r., 0 ~ ii',' 0 ¥ 'i '""; ":' 3 6 ;?' ANCHORAGE.. ALASKA 995i D A ]" E · 9 - 6 - 90 !:;,'EFtEt-?IF..NC.E' ARCO CASED HOLE FINAL. 3' i-6 8- i ,':J-9,:D F'RODUCTION F:'ROF ]:I_E i .- i i ::-~ .-A - 96, F' R 0 D U C '¥ :[ 0 NF' !-:.'. 0 F' I L I.-.-. .,...'-.,.-.-"~-,.,.., p,- 4 '"'.. , ..:.~- o ;.-',, .., ..... I:'F;.'ODLICT ]: 0N F'R;iF' l LE 2-:28 :3--'i 3-9;5 F'ROD~JC'I"IE~N F'F':.OFrILE 4 -. 6 9 - 2 '- 9,3 t-: 0 L L A R / P E: R F-' ..~. --.., FJ - i i '-- '.---' ,:'::, P F.'. 0 D U C:',~ T tq N F:' I.i: 0 F: 'r i ~:.- 'i 'i - 9 8 -9 - 9 ,:'} P I T £' · i. 3"- 4, ,.'.4-"7-"---.-';';:;,__, , ._. PF'RF' RECORD · i 3 - i '::',., "" '''~.-_, '='' - '::~,- r:;... C; F;..' / C C L i 3"-.4 F::-9-9;.'} LiEAI< DETECT:[ON/'GA~ 4 ~-..~ o, _ ,.~, _ ,::;, A .., i i PIT,':..' i "'-' .- t 5 8--- 6 ---9 ,'":; F' 'r 'r -,-:' , ,~ ._ ,-:, ,-:, o _ .-, .'.'.., _ .:.-;....,:; C N t... 'i '-- -'-" '-' 8- 2 ~--',;' (:) PiTS i '7 -'- 3 8 - i3 - 9 ,:'":, F' F;.: 0 D U C T ~ 0 N F:' R 0 F 1' L E: i :3- 2";:' 8- 23- 9'::_:, CNL i 8-2('} 8-29-9£) CCL F't_EA,'~TE ;']'IC-N AND RETURN 'THE ATTACHED COF'Y F,.:IECE]:VED BY _~ ~ HAVE A NIC:E DAY! :i-:: A L L. Y HOFFECK EF;:. A T 0--- i...., 2~': , RECEIVED SEP 1 2 1990 Oil .& Gas Cons. ~mcfiorage I STR I BUT ]: ON CENTRAL FILES ~HEVRON EXTENSION EXF'LORATION EXXON MARATHON MOBIL LIFT AY, RECEIPT OF DATA PHILLIPS F'B WELL F'I R & D BF'X STATE OF ALASKA TEXACO .... i-, i .... -.-. C' A i"i C E! C': iq f"i ('.:.' A "f' L A 3' C A ~'"i (': i:;: A i"l CCI ;?;' C i.-J .,. ~"i C A i'"i (:.': 0 C A r.i C f'd C A f'i C 0 ;~' C H 3.'CH C A M C 0 3' C H RTL. A5' STATE OF ALASKA ~ '"i :! ALASK,~ .... 'LAND GAS CONSERVATION CC MISSION ' APPLICA, ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 625' FNL, 445' FEL, Sect. 34, T11N, R15E, UM At top of productive interval 11130' FNL, 1542' FWL, Sect. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' SWL, Sect. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sect. 3, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) RKB 64 feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-6 9. Permit number 76-83 10. APl number 50 - 029-20111 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 12,315 feet 9127 feet Plugs(measured) None 12,200 feet 9037 feet Junk(measured) Length Size Cemented RECEIVED AUG 2 1990 &Jas~ O,~l & Gas Cons. Gq~,l~iSsi~[l -L:i..'. cra ........ Measured '~1 [t~ra~ertical depth 94' 20" 476 sx Fondu 118' 2167' 13 3/8" 700 sx PF II & 500 sx PF 2191' 8185' 9 5/8" 800 sx Class G & 250 sx PF 'C' 11,067' 1577' 7" 364 sx Class G 10,728'-12,305' measured 12117'-12127", 12134' -12143,' 12149'-12184', 12190' -12215' 118' 2191' 8209' 7986'-9119' true vertical 8974'-8981 ', 8987'-8994', 8998'-9025', 9030'-9050' Tubing (size, grade, and measured depth) 7"/4 1/2", L-80 tbg w/tail @ 10,791' Packers and SSSV (type and measured depth) Baker "FB-I" pkr @ 10,674' & CAMCO 'BAL-0' SSSV @ 2207' 13. Attachments Description summary of proposal 14. Estimated date for commencing operation June 1990 16. If proposal was verbally approved Name of approver Date approved X Detailed operations program BOP sketch X 15. Status of well classification as: Oil Gas Suspended Service Source Water Injector 17. I hereby certify that the foregoi,ng is true and correct to the best of my knowledge. Signed J'~^_ , . Title SeniorArea Engineer FOR COMMISSION U~l:: ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance ~ Mechanical Integrity Test Subsequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SM!TH Date CorllTff~sioner D~~ate Form 10-403 Rev 06/15/88 wi") M/.q;I IN/nh SUBMIT IN TRIPLICATE DESL iPTION SUMMARY OF PROtOSAL ARCO Alaska, Inc. proposes to perforate source water injector DS 4-6i at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently injecting source water. Seawater will be in the wellbore during perforating operations. These perforations are in the Victor waterflood zone. The reservoir pressure at the perforation depths is approximately 3710 psi. Proposed Perforation Interval' 11877' - 11954' Ref: BHCS 12/25/76. WDM: 5/22/90 RECEIVED AUG 2 Alaska Oil & Gas ConS. Anch0ra~ 2. 5000 PS1 WIR[LIN£ RAMS (VARIABL[ 3. 5000 PSI 4 1/~" LUBRICATOR 4. 5OOO PS~ 4 ~/~" flow TUB[ PACK-orr H]RELZNE ,B, OP EGUZPHENT. ARCO Alaska, In(. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 10, 1990 Mr. John Boyle Alaska Oil and Gas Conse~/ation Commission 3001 Porcupine Ddve Anchorage, Alaska 99501 Dear John: · Please cancel the following 14 Forms 403 for which no Forms 404 were wrilien. Per the drill-site engineers, this work has not been done and is no longer planned. 1987 _Date Signed 3-4 7-51 1/26/87 4-6 7-263 4/20/87 4-10 7-188 3/20/87 4-10 7-238 4/8/87 4-14 7-264 4/20/87 5-8 7-624 9/23/87 9-16 7-291 4/27/87 14-13 7-399 6/18/87 14-30 7-103 2/13/87 16-24 7-117 2/26/87 1988 3-9 8-826 11/2/88 3-13 8-854 11/17/88 6-13 8-316 4/28/88 9-34 8-864 11/21/88 . ¢,.,n....r, ,,nD ,~ ......... Please call me at oxq ~q 10 ~f you have any questions ~' "~ ~ these e..~.~. S i n/G~ly' , / ,-~ , ... ,,.71~--~ 's. T. ~e_c~e~? Records Pro6essor STH/ab/034 cc: J. L Glaeser - ATO 1528 ~ RECEIVED APR 1 8 1990 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO AL. ASKA: INC. ANCHORAGE~ ALAS'KA 99510 DATE' S-2i-90 REFERENCE' ARCO PRE2~JURE I)ATA '~-2'~ i --? 4-9~"', 4 -6 ~')- ~. ~ - 90 4 -"2 3 'i - '~ - 9 $ 4-3 0 2-~,, - 9O 9-8 i -2(-)-9() 9--S0 2-i (~-9~ 9-~2 2- t ~--9(D ~2-~ ~-26-89 t~ tt it-25-89 1 2-i 4 i 2-4-89 t '~.-t~ 8 ~'~-t 4-9~ i 2-~ t 2-29-89 t~-~ 2-t 5-9~ t6-5 t-t 7-9~ BHF ....£'TAT IC BHP--~TATIC GRADIENT BHP--£TATIC GRADIENT BHl:: .... 5;]"AT I C GRADIENT BHF ....,~TATIC GRADIENT BHl:: ..... STATIC GRADIENT BHF ....STATIC GRADIENT BHP--STATIC GRAI) IENT BHP--$TATIC BHF .... STATIC GRADIENT BHP--$TATIC GRADIENT BHP--5'TATIC GRADIENT BHP--$TATIC GRADIENT BI"IF'--FLOW I NG GRADIENT BHP--FLOWING GRADIENT BHP--FLOWING GRADIENT BHP--$TATIC GRADIENT BHP--$TATIC GRADIENT PLEASE ~IGN AND RETURN THE ATTACHED COPY RECEIVED RECEIVED BY _~~/~' MAR 7 1990 HAVE A NICE DAY! Alaska.Oil & Gas CoDs. ~AL. LY HOFFECKER ~ic['iQmg.a ATO-t 529 A~ RECEIPT OF AF'PROVED~:~_ TRAN$~ 9 HRS C A M C (] CAMCO C A ~,i C 0 CAMCO CAMCO CAMCO CAMCO HR2 CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO DATA DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL ,,-'"PHILLIF'$ F'B WELL. FILES ~ R & D RF'X 31' ~ 8'TATE OF ALASKA '~ TEXACO ARCO ALASKA, ]]NC~ F'.O. BOX t00360 ANCHORAGE, ALASKA 995i0 DATE' 3-t9-90 REFERENCE· ARCO CASED H(]LE FINAL~ t-26 S-iD-90 F'ERF RECORD RUN 2-29A 3-~3-90 CBT RUN t, 2-~9A S-~S-90 CET RUN 3-~ 3-i5-9~ SET BRIDGE PLUG RUN t 5' 3-22 S-t5-9~ VERTILOG 7' RUN t, ~ ~'"~ 5-9~ ' o-~.,. 3-i VIERTILO{~ 9 5/8" RUN t, 4-6 2-28-90 INJECTION PROFILE RUN i, 5" 5-26 2-28-90 PRODtJCTION F'ROFII_E RUN t, 5' 6-i8 S-i6-9~ COLLAR/F'ERF RUN i, ii-2S ~-ti-90 PFC RUN i, 5' PLEASE SIGN AND REI'URN THE ATTACHED COPY AS RECEIPT OF DATA. RECEIVED BY __~~") HAVE A NICE DAY! RECEIVED SALLY FIOFrF'ECKER A'FO- i 5~9.. MAR 2 7 ]990 AF'PROVED AI~sk~ Oi! & G~s Cons. comm~sst-o.,"'" Anchorage DISTRIBUTION CENTRAL FILES CFtEVRON D & M EXI'EN£ION EXPLORATION EXXON MARATHON MOBIL ¢ PHILLIPS PB WELL FILES R & D -.o B X ii -. 3~TATE OF ALA:~KA TEXACO 3; C H :2CH $CI-t ATI_A:,7 A T LA,!'~' ATLAS CAMCO CAMCO A"I'LA;~' ATLA£' !} ..,-::'~ T E ' 2 ---23 - 9 (3 F:: F; !::' E F.: !!: N C; E: ' A F.: C 0 C A ;:'.: E D H 0 L E F £ i'-.J. A L..,? .... :, ......... ,:,.., 4 i'I--i E A i [ ~-~ C i--t E D C: !;..' E C'iE ! VIE D B Y __.~ .... R-EE'EFVED j..~ ;.". ', ,' ::' ?..j 'r ,'" i::' -'. ' , ,,-.t ,~ ['.. A .,. L:'AYTM · ~.... ~ .... .."-'"- ' ' ~: ' t-""j "' "" "" i'" i-" '""~.', ,..,L..L, ,--,......t--~--,:: .... -...~,-,.. MAR -,5 I990 L:,'.'"""i A 'f'O- ~ '::"":' ;'" ,,, ,,,,~ ~in ' ""-' '? Alaska Oil & Gas Cons. A N 5,' :~. Anchorage D. .,.',' ,'..:.' T, F.: i B U T ! ri.. N CF-N TI;,'AL I-- i L_E;~' C l"i t'Z V l:;.'. 0 N ~ [.". X T E: N £' T_ C'i N EXPLORATION ~- EXXON M A R A T H ri N :~ M 0 B i L :J~ P 1411_ L. I F' :-? PB WELL_ F'ILE£' R & D ~'~ BPX .,-'"''JTATE OF ALASKA · ,-~"TEXACO THE CORREC'I"ED AF'I~ F'OR 5-6 IZ,.' ?,-(".:, .... ?;,'29-2(':)i?,T,. THFZ CORRECTED AF'I~ FOR ~:."':' .... .,..."':' .... ," 2 .... ~':!; .... o.. ,'"';.... C: :i':", "f' "'~ .... "':' ":" 2 .... ..!!: ..... ::;'::" C E:'i" :;.. :... i .. '... . 4 .... ,:!i 2 .... i (.) .... ?' (:.:, C R[ i... I... (:.'~ R' /t::' Iii: I:;: I::' ':' ....... : 2 .... .5 "-":? ;:'; I::' Iii: I:i: 1::' i:;.: Iii: C: i"i R 'i :.i:!: .... 6 2 .... 2 ..... :i;' ;:';,.. '¥' !.J i'}: ]: i".! {:.:. I:" i i"-.i C: J"J iii: J::~ F..' Iii: ,....,..,I ."'" r': ::-,.,'q l::' :J :0 l:,j 'i ..... i 2 ....:['~:: ..... ~;' ((:' I::' I!i: 1:''" i::' l:'': iii: C: I::j I:;: :0 t::' I''' IE ("'~ 2 Iii: ::'i'' : 1: :( :';' i'''~ ~I:':~ i''''! ):::' F;': Iii: 'i'' l..J !:;'" i''''t 'i'' !''i Ii': (:'~ T '!'' (:': C t''1 liil D C {:)F:' I '~II' :~:>: ;ii: 1:;'" Iii: C Iii: :i: I::' ~1'' i...I i::' )") ~':':'~ 'l' 2 ~':':'~ t''' I''' Y' i"10 l::' I::' Ii!: C: i'( iii: ,:.: (:.~ "r', I'"1... .... :i, :.:.}: ..:.."':, ,::~... i) :1: S '1" I:;.: :I: 'E.: U "f' :I: (:) N C: iii: N']" I:;,' r:>~ !... I::' :t: L. Iii: $ C: H Iii: 'v' I:;,' {:} N · ii: Iii: X 'l" iii: i".! ,?? :[ 0 i".] Iii: X F' I... (:} t:;.', r:>., ']" :l: (:) i".! :il: t:i: X X (:) N H ~':>~ I:;: ~t.~ 'i" H 0 N :Il: H (:J S :[ L -,,.""t::' I"1:1: I... I.. :[ I::',.~ ~'' I::' i3 b.J iii: I... I... I::' :1: I... Ii::,? 1:;: ,:.!., · ,,. .... }3 I::'X :I'~ 2. i" ~'='.'~ 'i" iii: f:) F' :'.'~.: I... i':':'t S I'( I':'."1 .:,. "1" !ii. )::: ~'::i 1. Operations Performed: .... STATE OF ALASKA A,- .,SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation Shutdown Stimulate Plugging __ Perforate Alter casing Repair well Pull tubing X Other ~_ Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development ..., Exploratory _ Stratigraphic _ Service X 4. Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11N, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1450' FNL, 1276' FWL, Sec. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 6. Datum elevation (DF or KB) 64' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number 4-6 feet 9. Permit number/approval number 76-83/9-1 053 10. APl number 50-029-20111 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical 12315' 9127' feet feet Plugs (measured) NONE Effective depth: measured 1 2220' true vertical 9053' feet feet Junk (measured) NONE Casing Length Structural Conductor 9 4' Surface 21 67' Intermediate 81 85' Liner 1 577' Perforation depth: measured Size Cemented 2 0" 466 sx Fondu 1 3-3/8" 700 sx PF II & 500 sx PF 9-5/8" 800 sx Class G & 250 sx PF 'C' 7" 364 sx Class G None open to production Measured depth True vertical depth 118' 118' 2191' 2191' 1 1067' 82O9' 1 0728'- 1 2305' 7986'-9119' true vertical None open to production Tubing (size, grade, and measured depth) 7"/4-1/2", L-80, Tbg w/ tail @ 1O792' Packers and SSSV (type and measured depth) CAMCO 'BAL-O' @ 2208', Baker 'FB-I' pkr @ 10675' RECEIVED 13. Stimulation or cement squeeze summary N/A Intervals treated (measured) , Treatment description including volumes used and final pressure FEB 1990 .0il .& Gas Cons, 14. N/A Prior to well operatio'n Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Subsequent to operation 15. Attachments *WORKOVER WELL HISTORY Copies of Logs and Surveys run __ Daily Report of Well Operations X* 16. Status of well classification as: Water Injector ~X Oil Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 17/89 Date SUBMIT IN DUPLICATE ARCO Oil and Gas Company ~ Wednesday after a well is spudded or workover [3 Wella,eHiStOrYstarted. ' Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first orerations District Daily work prior to spudding shoutd be summarized on the form giving inclusive dates only. ARCO ALASKA INC. NORTH SLOPE PRUDHOE BAY I ADL: 28328 I Lease or Unit AS 3421 I WORKOVER ITitle . API: 50-029-20111 ~~Well no. Field Auth. or W.O. no. ARCO Operator ACCEPT 12/20/89 0400 Date 1H°ur NABORS 1~S Spudded or W,O. begun Date and depth asof8:~ a.m. 12/20/89 PB=12220 SUPV:GLP Complete record for each day repoded 1) PREP TO PULL BPV ACCEPT RIG @ 0400 HRS 12/20/89. RU LINES TO TANKS. RU LUBRICATOR TO PULL BPV. DAILY:S73,556 CUM:$73,556 ETD:S73,556 EFC:$352,000 12/21/89 ( TD: 0 PB:12220 SUPV:GLC 2) TESTING BOP'S MW: 0.0 FSW PULL BPV. CIRC 8.5 PPG SEAWATER TO KILL WELL. SET BPV. TREE, NU BOPS. TEST BOPS TO 5000 PSI. ND DAILY:S21,606 CUM:$95,162 ETD:S95,162 EFC:$352,000 12/22/89 ( TD: 0 PB:12220 SUPV:GLC TEST BOPS MW: 0.0 FSW FIN TST BOPS TO 5000 PSI. MU LANDING JT AND ENGAGE TBG HNGR. PULL HNGR TO RIG FLOOR AND LD SAME. PULL AND LD 5-1/2" TBG AND ACCESSORIES. INSTALL BOP TEST PLUG AND PREP TO TEST PIPE RAMS. DAILY:S25,047 CUM:$120,209 ETD:S120,209 EFC:$352,000 12/23/89 (4) TD: 0 PB:12220 SUPV:GLC MILLING PACKER MW: 0.0 FSW TEST BOPS TO 5000 PSI. MU PKR MILL AND RIH ON 3-1/2" DP. TAG PKR @ 10681' MD MILL ON PKR. DAILY:S29,903 CUM:$150,112 ETD:S150,112 EFC:$352,000 12/24/89 ( TD: 0 PB:12220 SUPV:GLC LD PACKER AND TAILPIPE MW: 0.0 FSW MILLED PKR FROM 10681' TO 10683' MD. POOH, CHANGE PRT GRAPPLE. RIH. MILLED PKR FROM 10683' TO 10684' MD. PKR MOVED DOWNHOLE. ENGAGE PRT IN MILLOUT EXTENSION AND POOH. LD PKR AND TAILPIPE. DAILY:S24,695 CUM:$174,807 ETD:S174,807 EFC:$352,000 12/25/89 ( TD: 0 PB:12220 SUPV:GLC RIH W/6" MILL MW: 0.0 FSW LD PKR AND TAILPIPE. MU 6" SHOE AND JUNK BASKET AND RIH. TAG TOP OF FISH AND MILL ON SAME FROM 12053' TO 12056' MD. CIRC BTMS UP. SAW SMALL AMT OF GAS. POOH. RECOVERED SHEAR OUT SUB (FISH}. CLEANED PKR JUNK FROM JUNK BASKETS. MU 6" BLADED MILL AND RIH. DAILY:S25,130 CUM:$199,937 ETD:S199,937 EFC:$352,000 12/26/89 ( TD: 0 PB:12220 SUPV:GLC CIRCULATING HOLE MW: 0.0 FSW RIH W/6" MILL. TAG TOP OF FILL @ 12056'. WASHED FILL TO 12220' t~. CIRC BTMS UP. SHORT TRIP TC LiLER TOP. TAG FILL @ 12140' MD. WASHED FILL TO 12220'. CIRCULATE BTMS UP. SHORT TRIP TO LINER TOP. NO FILL. REVERSE CIRC HOLE CLEAN. DAILY:S25,752 CUM:$225,689 ETD:S225,689 EFC:$352,000 The above is correct see Procedures Manual, Section 10, ' Drilling, Pages 86 and 87. unmng Supt. AR3B-459-1 -D FEB 2 o 1990 OJ~ & Gas Oons~ C0mmissbn ,~ ~nch0r~ INumber all daily well history forms consecutively as they are prepared for each well. iPage no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number aH drill stem tests sequentially. Attach description of all cores. Work performed by Producing Sec[ion will be reported on "Interim" sheels until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin9 until completion. jCounty or Parish IState District I NORTH SLOPE AK ARCO ALASKA INC. Field ILease or Unit PRUDHOE BAY J DS 4-6 Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. NABORS 1ES 8) no. 12/27/89 ( TD: 0 PB:12220 SUPV:GLC 12/28/89 ( TD: 0 PB:12220 SUPV:GLP 12/29/89 ( TD: 0 PB:12220 SUPV:GLP 12/30/89 ( TD: 0 PB:12220 SUPV:GLP 12/31/89 ( TD: 0 PB:12220 SUPV:GLP .o) 11) [2) RIH W/BIT AND SCRAPER MW: 0.0 FSW CIRC HOLE AND DISPLACE HOLE WITH CLEAN, INHIBITED SEAWATER. POOH. RU E-LINE. RIHW/8-1/2" GAUGE RING AND JUNK BASKET. TAG JUNK @ 9880' MD. WORK JNK BSKT AND POOH. RECV'D BITS OF METAL AND RUBBER. MU 8-1/2" BIT AND 9-5/8" CSG SCRPR AND RIH. DAILY:S56,556 CUM:$282,245 ETD:S282,245 EFC:$352,000 REVERSE CIRC BTMS UP MW: 0.0 FSW RIH TO TOP OF 7" LINER W/8-1/2" BIT AND 9-5/8" CSG SCRPR. CIRC BTMS UP. RTNS CLEAN. POOH. RU E-LINE. RIH W/8-1/2" GAUGE RING AND JNK BSKT TO 10690' POOH. RECVD SMALL AMT METAL AND RUBBER. RIH W/SAME ASSEMBLY TO 10690'. POOH JUNK BSKT CLEAN. RIH W/6.0" GAUGE RING AND JUNK BSKT TO 12,209' ELM. POOH, JNK BSKT CLEAN. RIH W/9-5/8" RTTS W/1500' DP TAIL. TAG BTM @ 12,220' DPM. NO FILL. SET 9-5/8" RTTS @ 10,690' AND TEST 9-5/8" TO 3500 PSI F/30 MIN. RELEASE PACKER AND REVERSE CIRCULATE HOLE CLEAN. DAILY:S46,796 CUM:$329,041 ETD:S329,041 EFC:$352,000 TESTING 7" RAMS MW: 0.0 FSW POOH, LD TEST PACKER. MU BAKER PERMANENT PKR AND 4-1/2" TAILPIPE AND RIH ON DP. SET PKR @ 10,674' MD. TEST PKR TO 2700 PSI F/15 MIN. POOH, LD DP. CHANGE RAMS TO 7" AND TEST. DAILY:S28,242 CUM:$357,283 ETD:S357,283 EFC:$352,000 RIH W/7" TUBING MW: 0.0 FSW MU BAKER SEAL ASSEMBLY ON 7" 26# L-80 LTC MOD AND IJ4S TUBING AND RIH. (CAMCO 'BAL-O' SSSV @ 2208', BAKER 'FB-i' PKR @ 10675', & TT @ 10792'.) DAILY:S23,530 CUM:$380,813 ETD:S380,813 EFC:$352,000 NU TREE MW: 0.0 FSW RIH W/7" COMPLETION ASSEMBLY. STING INTO PKR AND VERIFY BY PRESS TO 500 PSI. BLEED PRESS, STING OUT, SPACE OUT. FREEZE 'PROTECT TOP 2200' W/175 BBLS DIESEL. LAND TUBING HANGER. TEST TUBING AND ANNULUS TO 3500 PSI F/30 MIN. SHEAR PLUG IN PKR TAILPIPE. SET BPV, ND BOP. NU 7" TREE. DAILY:S51,044 CUM:$431,857 ETD:S431,857 EFC:$352,000 The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ITitleDat~ / ¢~-~ / ~'0 Drilling Supt. AR3B-459-2-B Number all dally well history forms consecutively as hey are prepared for each well. Page no ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District ARCO ALASKA INC. Field PRUDHOE BAY County or ~a~h~. SLOP~ Lease or Unit ADL: 28328 IT t e WORKOV~R I Accounting coat center code State AK DS 4-6 We~l no. Auth, or W.O. no. AS3421 API: 50-029-20111 Operator A.R.Co. ARco w¢"l. 0 0 0 0 Spudded or W.O. begun Date ACCEPT 12/20/89 Date and depth Complete record for each day reported. as of 8:00 a.m. NABORS ZES 01/01/90 TD: 0 PB:12220 SUPV:GLP Iotal number of wells (active or inactive) on this cst center prior to plugging and bandonment of this well our 0400 Prior status if a W.O, RIG RELEASED MW: 0.0 FSW NU 7" TREE. TEST TREE TO 5000 PSI. RELEASED RIG @ 1000 HRS, 12/31/89. DAILY:S37,260 CUM:$469,117 ETD:S469,117 EFC:$352,000 Old TD PB Depth Released rig Kind of rig New TD Date Classifications (oil, gas, etc.) Producing method Potential test data Type completion (single, dual, etc.) IOff c a reservo r name(s) Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Datel / '~'''~) /~¢~ (~ Title Drilling Supt. AR3B-459-3-C Number ell daily well history forms consecutively as they are prepared for each we . iPage no. Olvl~Jon of AtlantlcRIchfieldCompany ARCO Alaska, Inc. Prudhoe Bay ,..ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 17, 1990 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-6 Permit No. 76-83 Dear Mr. Chatterton: Attached, in triplicate, is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/WDM/sbm Attachment cc: J.S. Dietz, BP Exploration J. Graber- ATO 1478 PI(DS 4-6)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C, STATE OF ALASKA ALASK/~ 'LAND GAS CONSERVATION C MISSION APPLICA 'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown __ Alter casing Repair well Plugging Change approved program Pull tubing Variance 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service Re-enter suspended well Time extension Stimulate Perforate X Other 6. Datum of elevation(DF or KB) RKB 64 feet 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 625' FNL, 445' FEL, Sect. 34, T11N, R15E, UM At top of productive interval 11130' FNL, 1542' FWL, Sect. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' SWL, Sect. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sect. 3, T10N, R15E, UM 8. Well number 4-6 9. Permit number 76-83 10. APl number 50 - 029-20111 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 12,315 feet 9127 feet Effective depth' measured 12,200 feet true vertical 9037 feet Plugs(measured) None Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Junk(measured) Length Size Cemented 94' 20" 476 sx Fondu 2167' 13 3/8" 700 sx PF II & 500 sx PF 8185' 9 5/8" 800 sx Class G & 250 sx PF 'C' 1577' 7" 364 sx Class G measured None open to injection true vertical Noneopen to injection Tubing (size, grade, and measured depth) 7"/4 1/2", L-80 tbg w/tail @ 10,798' Measured deptl~ True Vertical depth 118' 118' 2191' 2191' 11,067' 8209' 10,728'-12,305' 7986'-9119' Packers and SSSV (type and measured depth) Baker "FB-I" pkr @ 10,675' & CAMCO 'BAL-0' SSSV @ 2232' 13. Attachments Description summary of proposal X Detailed operations program 14. Estimated date for commencing operation January 20, 1990 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 2,~'~,~ ,'~~ Title BOP sketch X 15. Status of well classification as: Gas Suspended Source Water Injector Operations Engineering Manager Date FOR COMMISSION H~E ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance __ Mechanical Integrity Test Subsequent form required 10- ?_,~?~ovedr,_,-,~c~p¥ Approved by order of the Commissioner Commissioner Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY Approval No. Date / '"//(~/"' ~;'4¢) SUBMIT IN TRIPLICATE DES ~;IPTION SUMMARY OF PRL_ OSAL ARCO Alaska, Inc. proposes to perforate source water injector DS 4-6i at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently shut-in following a rig workover during which a profile modification squeeze was performed and all perforations were squeezed. Seawater will be in the wellbore during perforating operations. These additional perforations are in the Lower Romeo waterflood zone. Reperforations of the Lower Romeo, previously described in our Application for Sundry Approval dated October 11, 1989 (approval #9-916) will also be shot at the same time as these additional perforations. The reservoir pressure at the perforation depths is approximately 3700 psi. Proposed Perforation Interval' 12190' - 12215' Ref: BHCS 12/15/76. WDM: 1/16/90 1. ~)000 PSI ?" WELLH'~ CONNECTOR F'LANG[: 2. ~)000 PSI WIRE:LINE: RAIDS (VARIABLE SIZE:) 3. 5000 PSI 4 1/6" LUBRICATOR 4. ~000 PSi 4 1/6" F'LOW TUBE PACK-Orr 2 BOP EOUIPHENT MEMORANDUM State Jf Alaska ALASKA OIL AND GAS CONSERVATION COMPIISSION TO: Lonnie C Smith~J:x' DATE: January 3, 1990 Commissioner -~ FILE NO: D. JFB. 7 TELEPHONE NO: Michael T Minder Sr Petroleum Engineer BOP Test AAI PBU DS 4-6 Permit No. 76-83 Prudhoe Oil Pool .FROM: John F Boyl ·~ -~ ~>' Acting Petroleum Inspector Thursday, December 21, 1989: The test began at 5:30am and was ~o~%n~d~-~:~3~0am~ ~A~ the attached BOP test report shows, Nabors Rig 1ES had one failure, which was repaired and tested. In summary, I witnessed the BOP test on AAI DS 4-6. Attachment T~IPa-- I '=i--~ MCIN I 9 'OR Tr~p ~in~ Pl~ pug. ~er Lq l ............ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Inspection Report Location: Sec _~Y T //4l~/ R J%~ M UA Drlg contrctr /~/~(;;)(~,-~ Location (general) i~)Jc , Wel sign General housekeeping 4~)~ Rig Reserve pit (~) ~ Audio J ~ J f MUD SYSTEMS: Visual Trip tank Pit gauge Flow monitor Gas detectors DATE BOPE STACK: .~. Annular preventer Pipe rams Blind rams Choke line valves HCR valve Kill line valves Check valve Rig # Representative ~e~m~ ~ # --)(~ Rep ACCUMULATOR SYSTEM: Casing set ~ ft Full charge pressure 3000 psig Press after closure /~.~0 psig Pump incr clos press 200 psig min ~3 sec Full charge press attained ~ min t~ sec Controls: Master Remote~ Blind switch cover~ , KELLY AND FLOOR SAFETY VALVES: Test pressure Test pressure Test pressure Test pressure Test pressure Upper Kelly ~Lower Kelly Test Pressure ~-~ Ball type ~c~ / ~'~ ~ Inside BOP ~ ~'~/~ ~'~ Choke manifold ~' ~/ O~ ~3 Number valves qSt] / 0~00~ Number flanges ~ ~<)/ ~ g Adjustable chokes ~/~ Hydraulically operated choke ) TEST RESULTS: Failures ~ Test time ~ hfs Repair or replacement of failed equipment to be made within and Inspector/Commission office notified. days Distribution: orig - AOGCC c - Operator c - Supervisor C.004 (rev 03/17/89) I n spector~~l~, J' ~~~ ARCO AL. ASKA: INC: P,.(). BOX i (D(')S6(') ANCHORA[}E, AL..A~-'K A D A T iii] ' ~ 2 - 2 7- 8 9 F;.: E F:' li!] F;,' E N C E · A R C O C A ~ E ]J H O L E F:' I N A L S 4 .... 6 t 2 .-- t 4 .-- 89C 0 L.. I... A R / F:' L:i: R F:' F;.:( J N i '" ..,':"-' .--. i 8 i 2 -'" 6 ---P.., ~;~, C 0 I.. L.. A R R I..J N, t , ':~'..," .,.':t'. ........... i 9 i 2 i 8 89 t::'lii]f:.'.F' RECOF;.'i) ........ RI.tN i , "," t 2'-'-S 2 i 2-- S'... 89 P R [3 D LJ C T I [] N P R [3 F' I !... E R U N i , 5" i ;;.'"!: .-.- 27 i~-.. '') .... t ,' - .t Y C 0 L I... A R R U N i , ...,'::"" i S"- 29 i ''~ .... i t .-- (:' 9 ..... ;" · ~... d. 1... E A K ]} Ii-"'1" I..'i] C: T I l'.'] N F;: !.J N i , ':~' t 4 .... t 7 i '2- i 0 -..-89 L. E A K I)E T E C'1'' I 0 N R U N t , '...:" t 4 .... ,':, o t ') .... i 7 .-.-89 T U B I N [.; [": U T T E R F;.: E C 0 R D '- R ~J N t ':;," ,,.'., t...~ ..... ,., .~ i 7 .-.. 3 t 2- 9--.,°, 9 t... E A K D E't" E C T I 0 iH R LJ Ni '::'" ...... .~ ...:' i lit .... i 4 t 2 "" Iii "" 89 P I!:' R t"- R FZ C 0 R D R LJ N S' i & 2, P L. E A S E ,?:; I G N. A N D R E T U R N T H E r..t 1 [ ~'..'~ .., I.'It::. I) C: 0 P Y A.~: R E C E I P T 0 F:' I) A'I' A R E C E I V Ii.;. D B Y I..IAVE A NICE DAY! $ AI...I... Y I..t0 F:'Fli.~ C:I( E R '" '"-""- 5 RECEIVED _ ]] F;..'A N S':,~ 89 AiltslG Oil & Gas Cons, o.m e iF' chorage I) I ,S' T R I B LJ T I 0 N · ..'"' CENI"RAL. F'IL.E.~ PHII..L. II:-"S · '" '"~ .~ · ,,.'"' L. Fl E v R L] N F' B W E I... L. F' I I._ I::. D & M F,.: & D :l~ EXTENSION EXPL. OF;:AT I Oi"~ :,":. BPX '"' EXXON ..- $'t"~I'E OF AL. ASK A MARATHON ~ 'T'EXACO · ..'"- MOBIL 5" A 'f'L.. A ,S' C R M C 0 S(:::I..t C r::'~ i".'i C 0 R"f' L..A,? C A i't C 0 C A i~.i C 0 $ C H C A M C 0 1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing ~ Repair well __ Plugging ~ Time extension __ Stimulate __ Change approved program ~ Pull tubing ~ Variance ~ Perforate ~ Other 2. Name of Operator ARCO Alaska, Inco STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) RKB 64 ' 7. Unit or Properly name Prudhoe Bay Unit 8. Well number 4-6 9. Permit number 76-83 10. APl number 50-- 029-20'1 '1 '1 11. Field/Pool Prudhoe Bay Oil Pool feet 625' FNL, 445' FEL, 5ec.34, TllN, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 12. Present well condition summary Total depth: measured true vertical 12315 'MD feet 9127 ' TVD feet '12200'MD 9037 ' TVD feet feet Plugs (measured) Junk (measured) None '12018' or below small pieces metal Effective depth: measured true vertical measured Length Size Cemented Measured depth ~uevedicaldepth 94' 20" 466 sx Fondu 'I'I8'MD 'I'I8'TVD 2167' '13-3/8" 700 sx PF II & 2191'MD 2'Ig'I'TVD 400 sx PF 8185 ' 9-5/8" 800 sx C1 ass G 11067 'MD 8209' TVD 1577' 7" 364 sx Class G 10728'-12305'MD 7986'-9'I19'TVD See attached sheet (all squeezed) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: true vertical See attached sheet (all squeezed) 7", 26#, L80~ IJ4S and LTC-MOD tbg from surface to '1067~q~' Tubing (size, grade, and measured depth) 4-1/2", 12.6# MN-80, BTC tailpipe from '10700'-'10798 ~ Packers and SSSV (type and measured depth) Baker FB-1 pkr ~ 10675~ Camco BAL-O SSSV nipple ¢ 2232~ Description summary of proposal __ Detailed operations program BOP sketch 13. Attachments 14. Estimated date for commencing operation Becember '1989 16. If proposal was verbally approved Date approved 15. Status of well classification as: Oil ~ Service Gas __ Suspended Seawater In~ection Name of approver 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed //.~, ,~~~ Title Regional Drilling Engineer of approval: so representative may witness Plug integrity ~ B~P/Test Location clearance Mechanical Integrity '-~ubsequent form required 1"67- "/¢¢' Test/7~ ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the°~c~r~l~Cs~ion Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DS 4-6 APPLICATION FOR SUNDRY APPROVALS Block 11. Perforation Depths: TV__2 11652'-11672' 11678'-11698' 11716'-11770' 11788'-11857' 11877'-11954' 11964'-11972' 11986'-11993' 12000'-12007' 12039'-12082' 12095'-12111' 12117'-12127' 12133'-12142' 12148'-12183' 8633'-8648' 8653'-8668' 8681'-8721' 8734'-8786' 8802'-8860' 8868'-8874' 8884'-88g0' 8895'-8900' 8925'-Sg58' 8968'-8981' 8985'-8993' 8998'-9005' 9009'-9037' SA3/12a WORKOVER PROCEDURE PRUDHOE BAY DS 4-6 Objective' Pull the 7" completion tubing, mill the 9-5/8" permanent packer, and clean fill/junk out of the 7" liner. Re-run the 7" tubing and land the tubing in a new 9-5/8" permanent packer. 1. RUslickline. RIH and dump bai110-15' cement on top of junk @ 12,018'SLM. POOH, RD slickline. 2. RU electric line. RIH and perforate 7" tubing less than 5' from connection on top of second full joint above the packer at _+10,576' MD. RD electdc line. 3. MIRU workover rig. Circulate seawater into well. 4. Set BPV. ND 7" McEvoy Gen IV tree. NU 13-5/8" 5M BOP stack and test. Pull BPV. o . Engage tubing hanger. PU on 7" tubing to pull seal assembly from packer. Circulate bottoms up. POOH, LD 7" IJ4S and Mod LTC tubing and seal assembly. MU 8 1/2" packer milI/PRT and RIH to Baker 9-5/8" FB-1 permanent packer at 10675' MD. Mill over and retrieve packer and tailpipe. 7. MU 6" shoe and RIH to top of cement at_+12000' MD. Mill up junk and clean out 7" liner to PBTD @ 12,222' MD. Circulate hole dean, POOH. 8. RU electric line. RIH w/8.5" gauge ring/junk basket to 10700' MD. POOH. RD electric line. 9. MU 9-5/8" RTTS and RIH to top of 7" liner at 10700' MD. Set RTTS and pressure test 9-5/8" casing to 3500 psi for 30 min. POOH, LD RTTS. 10. MU 9-5/8" permanent packer with 4-1/2" tailpipe and RIH on 3-1/2" DP. Set packer at +10670' MD. Test packerto 3500 psi. Displace well with inhibited seawater. POOH, LD DP. 11. MU seal assembly on re-run 7' IJ4S and ABMod LTC IPC tubing and RIH. MU 7" wireline retrievable SSSV as directed. Sting seal assembly into packer and space out. Pressure test tubing and annulus to 3500 psi briefly. Freeze protect top 2200' MD of well with diesel. 12. MU McEvoy 7" Gen IV tubing hanger and land same in tubinghead. Pressure test tubing and casing to 3500 psi. Set BPV. 13. ND BOP's. NU McEvoy Gen IV tubinghead adapter and 7" 5M tree. Pull BPV, install tree test plug. Test tree to 5000 psi. Retrieve test plug. Set BPV. 14. Release rig. o BHP = 3825 psi @ 8800' TVD (8.36 ppg) Workover Fluid = 8.5 ppg Seawater 13-5/8" 5000 PSI BOP STACK ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 3 1.13-3/8" CASING HEAD 2.9-5/8" CASING HEAD 3.5000 PSI TUBING HEAD 4.13-5/8" - 5000 PSI BLIND RAMS 5.13-5/8" - 5000 PSI PIPE RAMS 6.13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2, ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF, 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD, RUN IN LOCK-DOWN SCREWS IN HEAD, 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS, 7, INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES, BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS, BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI, 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI, 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOVVOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14, PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. DAM 8/4/89 REVISION OF11/21/86 BOP SCH (FOR:AUDI 4,NORDIC 1, NAB 2ES) ARCO Alaska, Ir~ Prudhoe b~., Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 11, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-6 Permit No. 76-83 Dear Mr. Chatterton' Attached, in triplicate, is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/WDM/ry Attachment cc' J.S. Dietz, BP Exploration J. Gruber- ATO 1478 PI(DS 4-6) Wl-3 RECEIVED &iaska Oii & 6as Cons. CommissiO~ A~chorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B---6132-C STATE OF ALASKA __ U # I G I/V/I/. ALASF ")IL AND GAS CONSERVATION ( AMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing Repair well Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11N, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, T1 ON, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM Operation shutdown Plugging Pull tubing Variance 5. Type of Well Development Exploratory Stratigraphic Service X Re-enter suspended well Time extension Stimulate Perforate X Other ........ 6. Datum of elevation(DF or KB) RKB 64' feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-6 9. Permit number 76-83 10. APl number 50 - 029-20111 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 12315'MD feet 9127'TVD feet Plugs(measured) None Effective depth: measured 12200'MD feet true vertical 9037'TVD feet Junk(measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 94' 20" 466 sx Fondu 2167' 13-3/8" 700 sx PF II & 500 sx PF 8185' 9-5/8" 800 sx Class G & 250 sx PF 'C' 1577' 7" 364 sx Class G measured None open to injection Measured depth True vertical depth 118'MD 118'TVD 2191'MD 2191'TVD 11067'M D 8209'TVD RECE10728'-123~0~ME ~86'-9119'TV true vertical None open to injection OCT :[ i9 9 Tubing (size, grade, and measured depth) 7"/4'1/2", L-80 tbg w/tail @ 10798' ,~" ~,~"'~,;'~ gii & Gas I~Op.$. GO~t~,~[(~[[ AnchoKage Packers and SSSV (type and measured depth) Baker 'FB-I' pkr ~ 10675' & CAMCO 'BAL-O' SSSV ~ 2232' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation October 15, 1989 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby,.~ertify that the for_egoin.g is true and correct to the best of my knowledge. Signed ~ Title 15. Status of well classification as: Gas Suspended __ Source Water Injector Operations Engineering Manager Date FOR COMMISSION HSE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- /--¢~ ~/ ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Commissioner JApproval No. 2,-7/,' Approved Copy Returned Date i c4.~ - ~ ~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE DE, ~RIPTION SUMMARY OF PR..,'OSAL ARCO Alaska, Inc. proposes to reperforate source water injector DS 4-6i at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be dOne through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently shut-in following a rig workover during which a profile modification squeeze was performed and all perforations were squeezed. Seawater will be in the wellbore during perforating operations. These perforations are in the Lower Romeo waterflood zone. The reservoir pressure at the perforation depths is approximately 3700 psi. Proposed Perforation Interval: 12117' - 12127' 12134'- 12143' 12149' - 12184' Ref: BHCS 12/15/76. WDM' 10/9/89 L 1. 5000 P$~ ?" W~LLHr. AD CONN£C~O~ rLAN¢£ 2. 5000 PS1 WII~ELINE I~AM$ (VAI~IABL[ $tZC) 3. 5000 PS1 4 1/6" LUBI~iCATOI~ 4. 5000 PSI 4 1/6" IrLClM~ TUBE P)CK-orr 2 STATE Of ALASKA ALASK/-, .~,L AND GAS CONSERVATION COM MISSION RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~ GAS [] SUSPENDED ~ ABANDONED ~ SERVICE [] Water Tnj ector 2. Name of Operator 7. Permit Number ARCO A1 aska, I nc. 76-83 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20111 4. Location of well at surface 9. Unit or Lease Name 625' FNL, 445' FEL, 5ec.34, T11N, R15E, UM Prudhoe Bay Unit .... At Top Producing Interval 10. Well Number 1130' FNL, 1542' FWL, Sec. 3, TION, R15E, UM DS 4-6 ... At Total Depth t 1. Field and Pool 1494' FNL, 1236' FWL, Sec. 3, TION, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 64'I ADL 28328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ! 15. Water Depth, if offshore 16. No. of Completions 11/29/76 12/26/76 01/05/77*I N/A feet MS L 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set I 21. Thickness of Permafrost 12315'MD/9127'TVD 12200'MD/9037'TVD YES [] NO []I 2232' feet MDI 1900' (approx) 22. Type Electric or Other Logs Run D I L/BHCS/FDC ~ CNL/GR/CAL, CNL/CCL/GR, FDL ~ Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94# H-40 Surf 118' 39,, /~R sx Fnnd,t C.m'r. .. 13-3/8" 72# N-RO R.rf ?191' 17-1/?" 700 9-5/8" 47# HN-flO S,trf 110fi7' 17-1/M'. 800 s× C-'lass 0 c..m~ & 9_50 S× PF "(~" 7" 29# L-80 10728' 12305' 8-1/2" 364 sx Class C 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD ... interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7"/4-1/2" 10798' 10675 ' None open to production 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED All Perfs 146 sx premium cmt~ 185 sx Class G, & 365 sx Glass G 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I June 1977 Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO N/A TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/A * Note: Perforated well 5/12/77· Perforations added 10/21/84. . Workover performed and perforations squeezed 8/26/89 Ar~cho~aya (Dani ) WC6/059 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sag River Top Sadl erochit Base Sadl erochit GEOLOGI'C MARKERS MEAS. DEPTH TRUE VERT. DEPTH 8489' 8568' 9047' 30. 11471 ' 11581 ' 12212' Fur~MATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LI,~,T OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 1. Operations performed: Operation shutdown __ 2. Nam~ ~e~o..f O..pera. tor AKL, U AlaSKa, Inc. .... STATE OF ALASKA AL, ,A OIL AND GAS CONSERVATION REPORT oF SUNDRY WELL Stimulate Plugging __ Pull tubing ~ Alter casing 3. Address P.O. Box 100360 Anchorage~ AK 99510-0360 Perforate ..__ 4. Location of well at surface 625' FNL, 445' FEL, Sec.34, TllN, R15E, UN At top of productive interval AterTectlveJ'130' ~e~ ' h1542 FWL, Sec. 3, TION, R15E, UM 1437' FNL, 1284' FWL, Sec. 3~ TION, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, TION, R15E, UM Repair well __ . ..... Pulltubing__ i) Other_C_ Workover 12. Present well condition summary Total depth: measured true vertical 5. Type of Well: Development Exploratory Stratigraphic Service Effective depth: measured true vertical Length 6. Datum elevation (DF or KB) RKB 64 ' 7, Unit or Property name Prudhoe Bay Unit 8. Well number 4-6 12315 'MD feet feet 9127 'TVD 12200 'MD feet feet 9037 'TVD Size 94' 2167 ' 20" 13-3/8" 9-5/8" 7" 8185 ' 1577' measured true vertical None open to production None open to production Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Plugs(measured) . Junk (measured) Cemented 466 sx Fondu 700 sx PF II & 500 sx PF 800 sx Class G & 250 sx PF 'C' 364 sx Class G Tubing (size. grade, and measured depth) 7"/4-1/2", L-80 tbg w/tail ~ 10798' Packers and SSSV (type and measured depth) Baker 'FB-I' pkr @ 10675' & CAMCO 'BAL-O' SSSV @ 2232' 13. Stimulation or cement squeeze summary I nt.e.r.val,.s treated .(.meas u red) hi I rerTora~ons Treatment description including volumes used and final pressure 146 sx Premium cmt, 185 sx Class G cmt& 365 s× class 6; cmt 14. N/A None Prior to well operation feet 9. Permit number/approval number 9-013, 8-$43, 7-891/76-83 10. APl number 50-- 029-20111 11. Field/Pool Prudhoe Bay Oil Pool 12200' or below (3-1/8" perf gun w/CCL and sinker bar) Measured depth True vertical depth 118'MD 118'TVD 2191 'MD 2191 'TVD 11067 'MD 8209 'TVD 10728'-12305'MD 7986'-9119'TVD Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Subsequent to operation 15. Attachments 116. Status of well classification as: Copies of Logs and Surveys run ~ ! Daily Report of Well Operations ..r_. Oil ~ Gas ~ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Tubing Pressure Signed (~0J)0~ (~,[.~)4j(_~.~ Title Driltinq ~flaly,51; Form 10-404 Rev06/15/88 ~/ (DAH) SW04/050 Service Water I njectnr Date SUBMIT IN DUPLICATE ARCO Oil and Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only, District ARCO ALASKA INC. PRUDHOE BAY ICounty. parish or borough NORTH SLOPE L .... z~)L,~ ? 28328 Title WORKOVER Field State AK DS 4-6 IiWelI no. 1 API: 50-029-20111 ARCO W I. Operator ARCO 0 o 0000 Spudded or W.O. begun IDate IHour Prior status if aW,O. ACCEPT I 08/01/89 I 1900 HRS Date and depth Complete record for each day reported as of 8:00 a.m. AUDI 4 1) 08/01/89 TD: 0 PB:12222 SUPV:RJB 08/02/89 ( TD: 0 PB:12222 SUPV:RJB 08/03/89 ( TD: 0 PB:12222 SUPV:ZR 08/04/89 ( TD: 0 PB:12222 SUPV:ZR 08/05/89 ( TD: 0 PB:12222 SUPV:ZR 08/06/89 ( TD: 0 PB:i2222 SUPV:ZR RU RIG MW: 0.0 seawater MOVE RIG FROM DS 1-25 TO DS 4-6. WELD ON SUPPORT BEAMS FOR PONY SUB. SPOT RIG AND JACK UP. SPOT AND JACK UP PIT MODULE. SPOT PIPE SHED. DAILY:S31,000 CUM:$31,000 ETD:S31,000 EFC:$1,189,000 NU BOPS MW: 0.0 seawater SPOTTED PIPE SHED AND JACKED UP. WELD SPREADER BEAMS ON PONY SUB AND BUILD AND MODIFY STAIRS.. RAISED DERRICK AND ACCEPTED RIG @ 1900 HRS 08/01/89. CHECK WELL FOR PRESSURE. ND TREE, NU BOP. DAILY:S74,700 CUM:$105,700 ETD:S105,700 EFC:$1,189,000 POOH W/5-1/2" TBG MW: 0.0 seawater NU BOPE. PULL BPV, INSTALL TST PLUG. ATT TO TST BOP, PLUG LEAKING. REPLACE TST PLUG AND TST BOP TO 2000 PSI. PULL TST PLUG. MU SPEAR ON JT DP AND PULL HNGR FREE W/175K#. PULL AND LD HNGR AND SPEAR. ATT TO FILL HOLE. NO RTNS. MIX AND PUMP 50 BBL HEC PILL AND DISPLACE W/SEAWATER. GOT HEC RTNS AFTER 99 BBLS SEAWTR PUMPED. WELL STABLE. POOH, LD 5-1~2" TBG. MIX AND PUMP 100 BBL HEC PILL AND BULLHEAD SAME DOWN TBG. WELL STABLE. POOH, LD TBG. DAILY:S127,100 CUM:$232,800 ETD:S232,800 EFC:$1,189,000 PULL TEST PLUG MW: 0.0 fsw SERV RIG. CONT POOH W/ 5-1/2" TBG. CIRC DIESEL OUT. CONT POOH. SBR RECOVER ED W/ TBG. RD FLOOR. CO RAMS TO 3-1/2". SET TEST PLUG & TEST BOPS. DAILY:S27,100 CUM:$259,900 ETD:S259,900 EFC:$1,189,000 RIH W/ PKR MILL MW: 0.0 FSW SERV RIG. MU FTA #1. RIH ON 3-1/2" DP. TAG SLICK STICK @ 10442'. WASH OVER & RELEASE K-ANCHOR. CBU DUE TO GAS. POOH W/ S-STICK & K-ANCH. LD SAME. MU FTA ~2. RIH W/ SAME. DAILY:S30,088 CUM: $289,988 ETD:S289, 988 EFC:$1,189,000 RIH W/ FTA #4 MW: 0.0 FSW SERV RIG. CONT TIH. SHEAR OTIS SOS W/ 1400 PSI. MILL BAKER SAB PKR F/ 10487' TO 10491'. PUSH PKR TO 10501'. PRT WOULD NOT ENGAGE. CBU AFTER 5 BBL GAIN. LOST RETURNS. PUMP 50 BBLS HEC. WELL STABLE. RIH W/ 7 JTS DP. ENGAGED PKR W/ PRT @ 10710' (TOL). POOH W/ PKR. LOST PKR IN FO. RIH W/ SFEAR. ENGAGE PKR @ 1965'. POOH W/ FISH. 20K DRAG THROUGH TOP FO. LD PKR & TAIL ASSY. MU FTA#4. RIH W/ SAME. DAILY:S27,100 CUM:$317,088 ETD:S317,088 EFC:$1,189,000 The above is correct Signature -- % ~ ~ For form pYeparation and distribution. see Procedures Manual. Section 10. Drilling, Pages 86 and 87. ~- - . ~ ,:~ - AR3B-459-1-O _. -~ ':' · INumber all daily well history forms consecutively .... -,-~, ;,-~5,~,~'-:"'; ~las"they are prepared for each well. I iPage no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations, if testing, coring, or perforating, show formation name in describing work perlormed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequenUy than every 30 days, or (2} on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting o! oil string until completion. j County or Parish IState ARCO ALASKA INC. I NORTH SLOPE I AK Field ~Lease or Unit ' PRUDHOE BAY I DS 4-6 1 Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a,m. AUDI 4 District Well no. 08/12/89 ( TD: 0 PB:12222 SUPV:RJB 08/13/89 ( TD: 0 PB:12222 SUPV:RJB 08/14/89 ( TD: 0 ?B:12222 SUPV:RJB 08/15/89 ( TD: 0 PB:12222 SUPV:RJB L2) :3) 14) ].5) SUPPORT BUSHING. PULL 9-5/8" PO. NO VISIBLE DAMAGE. RU W-ATLAS. DAILY:S75,700 CUM:$529,920 ETD:S529,920 EFC:$1,189,000 CUT 9-5/8" CSG MW: 0.0 FSW RIH AND SET 9-5/8" EZSV @ 10400' MD. UNABLE TO REL F/EZSV. PULL OUT OF ROPE SOCKET. RAN CCL F/500' TO SURF. MU 1-3/4" GRAPPLE AND RIH. LATCH AND RETR ROPE SOCKET AND RNG TOOL. MU 9-5/8" RTTS AND SET @ 80' MD. TST BELOW RTTS TO 2000 PSI. REL RTTS, DISPL TOP 80' OF HOLE W/DIESEL. POOH, LD RTTS. MU 9-5/8" MECH CSG CTR AND RIH TO 40' MD. ATT TO CUT 9-5/8" CSG @ 40' MD W/O SUCCESS. POOH, REPL CUTTER AND RIH. CUT 9-5/8" CSG @ 40' MD. DAILY:S57,100 CUM:$587,020 ETD:S587,020 EFC:$1,189,000 NU TUBINGHEAD MW: 0.0 FSW CUT 9-5/8" CSG @ 44' MD. POOH W/CUTTER. MU SPEAR AND RIH. ENGAGE 9-5/8" BELOW HNGR AND POOH W/9-5/8". MU HYD BACK OFF TOOL AND SET SAME ACROSS 9-5/8" CONN @ 61' MD. BACK OFF 9-5/8". POOH, LD BACK OFF TOOL. MU SPEAR AND RIH. ENGAGE 9-5/8" STUB AND FIN BACK OFF. POOH W/9-5/8" STUB. ND BOPS AND MCEVOY GEN I UNIHEAD. NU MCEVOY 9-5/8" CSGHD AND TST TO 2000 PSI. NU BOPS. RAN TWO JTS 9-5/8" CSG AND SCREW INTO 9-5/8" @ 61' MD. PRESS TST 9-5/8" TO 3500 PSI. LAND 9-5/8" CSG W/120K~ ON EMER HNGR. ND BOPS AND CUT 9-5/8" CSG. INSTALL 9-5/8" PACK OFF AND MCEVOY TUBINGHEAD. DAILY:S39,400 CUM:$626,420 ETD:S626,420 EFC:$1,189,000 RIH W/6" BIT MW: 0.0 FSW NU MCEVOY TUBINGHEAD AND PRESS TST TO 3500 PSI. NU BOPS AND TST TO 5000 PSI. PRESS TST 9-5/8" CSG TO 3500 PSI. MU 8-1/2" BIT AND RIH. DRLD EZSV @ 10400'. RIH TO 10723'MD. DRLD TO TOL @ 10726'MD. POOH. MU 6-1/2" BIT AND RIM TO CLEAN OUT 7" LINER. DAILY:S49,600 CUM:$676,020 ETD:S676,020 EFC:$1,189,000 RIH W/NEW 6-1/2" BIT MW: 0.0 FSW RIH W/6-1/2" BIT. TAG TOP OF JUNK IN 7" LINER @ 10726' MD. DRLD JUNK F/10726 TO 10734' MD. RIH, TAG TOP OF CMT @ 11234' MD. DRLD CMT F/11234' - 11676' MD POOH, MU NEW BHA AND RIH. DAILY:S27,100 CUM:$703,120 ETD:S703,120 EFC:$1,189,000 The above is correct ,~ For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 '* AR3B-459-2-B Drilling Supt. .. ' '"'" Number al~ daily well history as they are prepared for each ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilting or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerlm" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "lnlerim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ unlil completion. District Field I County or Parish [State ARCO ALASKA INC. J NORTH SLOPE I AK Lease or Unit PRUDHOE BAY I DS 4-6 Iwell no. Date and depth as of 8:00 a.m, Complete record for each day while drilling or workover in progress AUDI 4 08/07/89 ( 7) TD: 0 PB:12222 SUPV:ZR 08/08/89 ( ) TD: 0 PB:12222 SUPV:ZR 08/09/89 ( 9) TD: 0 PB:12222 SUPV:ZR 08/10/89 ( 0) TD: 0 PB:12222 SUPV:RB 08/11/89 ( 1) TD: 0 PB:12222 SUPV:RB The above is correct Si at ~ For forYn prel~aration and distribution see Procedures Manual Section 10. Drilling, Pages 86 and 87 d AR3B-459-2-B POOH W/ FTA #5 MW: 0.0 FSW SERV RIG. CONT TO RIH W/ FTA#4. TAGGED JUNK OR TOL @ 10762'. BRK CIRC. TAG FISH $1 @ 12160'. WASH & ROT OVER SAME. ATEMPT TO PU. WELL BEGAN FLOWING. CIRC THRU CHOKE. PUMP 50 BBL HEC. CHASE W/ 90 BBL FSW. WELL STABLE. POOH W/ FTA $4. NO DRAG. OUT OF HOLE- NO RECOVERY. CRIPPLE SHOE WORN OUT & WASH PIPE SCARRED ON OUTSIDE. MU FTA $5. RIH W/ SAME. C & S DRILL LINE. CONT RIH. TAG TOL @ 10744'. LATCH FISH @ 12158'. JAR UP SEVERAL FEET. FREE FROM FISH. SET BACK DOWN. ENGAGE 5' SHALLOWER. POOH W/ FTA $5 DAILY:S28,482 CUM:$345,570 ETD:S345,570 EFC:$1,189,000 LD FTA $6 W/ FISH MW: 0.0 FSW SERV RIG. CONT POOH W/ FTA $5. REC PERF GUN W/ CCL. MU FTA $6 AND RIH TO 12156'. WASH & ROT F/ 12160' TO 12218' PBTD. PUMP HEC SWEEP AROUND. POOH W/ FTA $6. LD FTA $6 W/ FISH. (WIRELINE SSSV PRONG) MU BRIDGE PLUG & PREP TO RIH W/ SAME. DAILY: $27,100 CUM: $372,670 ETD: $372,670 EFC: $1, 189,000 NU BOPS MW: 0.0 FSW MU HOWCO RBP. SERV RIG. RIH W/ RBP. SLIP D-LINE. RIH W/ RBP. SET RBP @ 10720'. TEST 9-5/8" CSG TO 1000 PSI. PULL 1 STAND. PULL WEAR BUSHING. MU RT TS. RIH TO 25' AND HANG OFF STRING. REMOVE MCEVOY SUPPORT BUSHING & 9-5/8" PO. INSTALL NEW PO. WOULD NOT TEST. ATTEMPT TO REMOVE SAME - UNABLE. ND BOPS. REMOVE PO & CLEAN OUT CASING HEAD. INSTALL 2ND NEW PO. WOULD NOT TEST . CONTINUE TO WORK WITH PO. DAILY:S54,450 CUM:$427,120 ETD:S427,120 EFC:$1,189,000 RU BELL NIPPLE MW: 0.0 FSW TEST 9-5/8" PO TO 3000 PSI. BLED OFF TO 2600 PSI IN 15 MIN. NU BOPS. RUN TEST PLUG. TEST BOPS. INSTALL WEAR RING. MU SSCV RETR TOOL. SCREW INTO RTTS. TEST 9-5/8" F/ 25' TO 10720'. TEST TO 3500 PSI. TEST GOOD. RELEASE RTTS. PULL RTTS TO FLOOR & LD SAME. RIH 1 STAND. RELEASE RBP. CBU. NO GAS. TOH 18 STDS. DID NOT HAVE RBP. TIH 18 STDS & TAG RBP. ENGAGE & POOH. ND BELL NIPPLE. NU SHOOT NIP. RU W-ATLAS. RIH W/ EZSV. SET @ 11862' WLM. POOH & RD E-LINE. DAILY:S27,100 CUM:$454,220 ETD:S454,220 EFC:$1,189,000 RU W-ATLAS E-LINE MW: 0.0 FSW SERV RIG. PU & RUN 2-7/8 W-STRING. STING INTO EZSV @ 11862'. RU BJ HUGHES. EST INJ RATE: 3 BPM @ 1400 PSI BELOW EZSV, 3 BPM @400 PSI BELOW. BATCH MIX 75 BBLS(365 SX) CLASS G. PU[-~ & o~o~ ............. ~.~,~o ~,~,. FINAL ..... , ,,~ ~vv~ 2SI ~ ~ ~,~"...~"'"~,., & SQZ 26 BDL~o~ZCV~ nZ~V. rI~e2.R~SS 850 2SI ~ 1.75 ,.: , INumber all daily we) history forms Consecutively as they are prepare(;l' fOr. each Weli.' ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "hlterlm" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. ICounty or Parish I District I NORTH SLOPE J State ARCO ALASKA INC. AK I Field ILease or Unit PRUDHOE BAY I DS 4-6 i Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. AUDI 4 [6) IWell no. 08/16/89 ( TD: 0 PB:12222 SUPV:RJB 08/17/89 ( TD: 0 PB:12222 SUPV:RJB o8/18/89 ( TD: 0 PB:12222 SUPV:ZR 08/19/89 ( TD: 0 PB:12222 SUPV:ZR 08/20/89 ( TD: 0 PB:12222 SUPV:ZR 08/21/89 ( TD: 0 PB:12222 SUPV:ZR [7) 19) 20) RIH W/2-7/8" STINGER MW: 0.0 FSW RIH, TAG FILL @ 11659' MD. DRLD CMT F/11659' TO 11853' MD (TOP OF EZSV). PRESS TST CSG TO 1500 PSI. PRESS BLED OFF. EST INJ RATE OF 1.3 BPM @ 1500 PSI. CIRC BTMS UP. POOH. MU 2-7/8" TBG STINGER ON 3-1/2" DP AND RIH. DAILY:S52,127 CUM:$755,247 ETD:S755,247 EFC:$1,189,000 RIH W/6" BIT MW: 0.0 FSW RIH W/2-7/8" STINGER ON DP TO 11853' MD. EST INJ RATE OF 1 BPM @ 1500 PSI. MIX AND PUMP 30 BBLS(146 SX) CL G. DISPL CMT W/SEAWATER. POOH TO 10630' MD. SQZ 4 BBLS OF CMT INTO PERFS. FINAL SQZ PRESS = 1300 PSI. HELD PRESS F/1 HR, THEN BLED BACK 4 BBLS SEAWATER. REV CIRC BTMS UP, POOH. MU 6" BIT AND RIH. DAILY:S50,648 CUM:$805,895 ETD:S805,895 EFC:$1,189,000 DRILLING EZSV MW: 0.0 FSW RIH, TAG TOC @ 11067' MD. DRLD CMT TO 11854' (TOP OF EZSV). CIRC HOLE CLEAN. PRESSURE TEST 9-5/8" X 7" CASING AND SQZ PERFS TO 1500 PSI. PRESSURE BLED TO 1300 PSI IN 10 MIN. REPEATED TEST TWICE WITH SAME RESULTS. DRILL ON EZSV. DAILY:S28,750 CUM:$834,645 ETD:S834,645 EFC:$1,189,000 CIRC TO CLEAN HOLE MW: 0.0 FSW DRLD CMT RTNR F/11854' - 11855' MD. TRIP F/BIT #5. DRLD CMT RTNR AND CMT TO 12200' MD. CIRC HOLE CLEAN. DAILY:S34,775 CUM:$869,420 ETD:S869,420 EFC:$1,189,000 PREP TO SQUEEZE CMT MW: 0.0 FSW CIRC HOLE CLEAN. TST SQZD PERFS TO 1500 PSI. SQZ BROKE DOWN. EST INJ RATE OF 2 BBL/MIN @ 1500 PSI. POOH, MU 1000', 2-7/8" TBG ON 3-1/2" DP AND RIH. TAG TOC @ 12213' MD. REV CIRC BTMS UP. EST INJ RATE OF 2 BBL/MIN @ 1450 PSI. PREP TO CMT SQZ LEAKING PERFS. DAILY:S28,312 CUM:$897,732 ETD:S897,732 EFC:$1,189,000 DRILLING CMT MW: 0.0 FSW MIX AND PUMP 185 SX (38 BBLS) CMT AND SPOT ON BTM. POOH 15 STANDS. SQZ 3-1/2 BBLS CMT INTO PERFS. FINAL SQZ PRESS = 1300 PSI. HELD PRESS F/1 HR AND BLED BACK 3 BBLS. CIRC BTMS UP. POOH, LD 2-7/8" TBG. MU 6" CMT MILL ON DP AND RIH. TAG SOFT CMT @ 11096' MD. DRLD SOFT CMT TO 11227' MD. DRLD FIRM CMT TO 11389' MD. DAILY:S56,227 CUM:$953,959 ETD:S953,959 EFC:$1,189,000 The aboveisigna~.A ....... t : d~istr~ut~o~~ ~, For form p~'eparation an see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B I N umber all daily well history forms consecutively as they are prepared for each well, ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number ail drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting et oil string until completion. District tCounty or Parish IState ARCO ALASKA INC. I NORTH SLOPE Field IiLe ..... Uni~)s 4--6 PRUDHOE BAY Complete record for each day while drilling or workover in progress AUDI 4 Date and depth as of 8:00 a.m. 08/22/89 ( TD: 0 PB:12222 SUPV:ZR 08/23/89 ( TD: 0 PB:12222 SUPV:ZR/TWM 08/24/89 ( TD: 0 PB:12222 SUPV:ZR/TWH 08/25/89 ( TD: 0 PB:12222 SUPV:RJB 08/26/89 ( TD: 0 PB:12222 SUPV:RJB .~2) :4) ~5) 26) DRLG CMT MW: 0.0 FSW DRLD CMT F/ 11389' TO 11573' MD. CIRC HIGH VIS SWEEP, TRIP F/NEW BIT #7. DRLD CMT F/ 11573' TO 11630' MD. AK DAILY:S28,590 CUM:$982,549 ETD:S982,549 EFC:$1,189,000 RIH W/CSG SCRAPER MW: 0.0 FSW DRLD CMT F/11588' - 11854' MD. PRESS TSTD SQZD PERFS TO 1500 PSI. PRESSURE BLED OFF TO 175 PSI IN 15 MIN. DRLD CMT TO 12213' MD. PRESSURED SQZD PERFS TO 1500 PSI. PRESSURE BLED OFF. EST INJ RATE OF 1 BPM @ 1500 PSI. CIRC HOLE CLEAN. POOH. MU 9-5/8" CSG SCRAPER AND RIH. DAILY:S28,350 CUM:$1,010,899 ETD:S1,010,899 EFC:$1,189,000 POOH W/SETTING TOOL MW: 0.0 FSW RIH W/9-5/8" SCRPR TO 10726' MD. DISPLACE WELL W/INHIBITED SEAWATER. POOH, LD BHA. MU BAKER PKR AND TAILPIPE AND RIH ON DP. SET PKR @ 10675' MD. PRESSURE TEST PKR TO 1000 PSI. POOH WITH PKR SETTING TOOL. DAILY:S27,200 CUM:$1,038,099 ETD:S1,038,099 EFC:$1,189,000 RIH W/7" TUBING MW: 0.0 FSW POOH, LD DP. CHNG RAMS TO 7" AND TST TO 5000 PSI. TST 9-5/8" CSG AND PKR TO 3000 PSI F/30 MIN. MU BAKER SEAL ASSEMBLY AND RIH ON 7" TUBING. ND BOP TIH W/7" TBG, SSSV. SPACED AND LAND TBG HANGER, TSTD 7" TBG AND 9-5/8" ANN. SET BPV, ND BOP. CAMCO 'BAL-O' SSSV @ 2232', BAKER 'FB-i' PKR @ 10675', & TT @ 10748'. DAILY:S27,200 CUM:$1,065,299 ETD:S1,065,299 EFC:$1,189,000 IWell no. The above is correct ~ \ For form preparation and di~'~ri~ution see Procedures Manual Section 10. Drilling, Pages 86 and 87 AR3B-459-2-B INumber all daily well hist~ as they are prepared for each well. ARCO L~I and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Reporl" on the first Wednesday after allowable has been assigned er well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Firlal Report" Iorm may be used for reporting the entire operation if space is available. I Accountin§ cost center code District IState ARCO ALASKA INC. IAK I County or Parish I NORT}{ SLOPE Field ~Lease or Unit ?RUDHOE BAY I ADL: 28328 DS 4-6 Auth. or W.O. no. ~Title AS 1941 I WORKOVER Operator ARCO IWelt no. Spudded or W.O. begun ACCEPT Date and depth as of 8:00 a.m. 08/27/89 (27) TD: 0 PB:12222 API: 50-029-20111 A.R.Co. W.I. ITota[ number of wells (active or inactive) on this Icost center prior to plugging and ~ 0.0000 labandonment of this well Date ~Prlor status if a W.O. 08/01/89 IH°ur 1900 HRS Complete record for each day reported AUDI 4 RIG RELEASED MW: 0.0 FSW INSTALL TBG HEAD ADAPTER, PULL BPV. TEST TREE AND FLANGE. SECURE WELL. RIG DOWN. RELEASED RIG AT 1700 HRS 8/26/89. SUPV:RJB DAILY:S443,500 CUM:$1,508,799 ETD:S1,508,799 EFC:$1,189,000 Old TD I New TD PB Depth Released rig I Date Kind of rig Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on te'st Gas per day Pump size. SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct ,%,, For form prepa;a~, .... d distribgtion, see Procedures Manual, Section Drilling, Pages 86 and 87. AR3B-459-3-C INumber ill daily well histow forms consecutively j Page no. for each well. ~ . . . Dlvl~on of AtlantlcRIchfleldCompany ARCO ALAZKA, INC. F'~ O. BOX ANCHORAGE, ALASKA 995t DATE' 8-~.~-89 REFERENCE' ARCO CASED HOLE FINALS I -t A 8-t 2-89 CET-THICKNE~' RUN ~-~A 8-~2..-89 CORR. PROTECTION EVAL. RUN ~ ~ 2' t -t 9 8-t S-89 COLLAR/F'ERF RUN 4-6 8-t ~-89 COI_LAR RUN 4-6 8-~ 0-89 BRIDGE PLUG RUN 5-tt 8-t 4-89 D;[F'F. I'EMP RUN t, 5" ~-t i 8-i 4-89 CNL-GAMMA RUN -D-t 8 8-t G-89 CET RUN 9-t.. ~ 8-2-89 INJECTION F'ROFILE RUN t, 5" 9-t8 8-S-89 INJECTION F'ROFILE RUN 9-i9 8-4-89 INJECTION PROFILE RUN t, 9-25 8-4-89 ~'INJECTION PROFILE RUN t , ~' --tt-27 7-2-89 DUAL SPACED NEUTRON RUN i, t6-t 8-7-89 INJECTION PROFILE RUN t7-$ 8-9-89 COLLAR/PERF RUN t t 8-~ e 8-$-89 I'EMP/WHUT ~URVEY RUN PLEASE SIGN AND RETURN I'HE ATTACHED COPY A~' RECEIPT OF DATA. .gCH $CH ATLA*J' A'I'LA~ A TI...A.9 A'f'LA:~' ATLAS' ;~'CH CAMCO CAMCO CAMCO CAMCO FILS' CAMCO CAMCO RECEIVED BY CENTRAL FILES CHEVRON D & M EXTENSION EXF'LORATION EXXON MARATHON MOBIL F'HII_LIF'S F'B WELL FILES R & D BF'X ~'I'ATE OF ALA~'KA TEXACO TFIE CORRECTED API~ FOR 5-tj I$ 5¢-e'> 2 ~9- e252, THE CORRECTED AF'I~ FOR 9-~9 IS 5e-e29-2e26e. ARCO ALAZKA: INC~ F'~O, BOX ~ E.~(-)560 ANCHORAGE, ALAZKA 995 i 0 DATE' 8-3-89 REFEF.'.ENCE' ARCO CASED HOLE F'INAL'<j -i 7 7-3,3,-89 COI_LAR RU~W 4-6 7-Z~;-3,-89 YVB lNG CU'i°i 7-7A 7-27'-89 DUAl._ BURST i'D'T'-F' RUN '7 -- 7 A 7 - '2 7 -- 8 9 C N L R U l'.~ 7.-i4 7/':26-27/89 D]:F'F'EREi',~T]:AI_ TEMP F(UN 7-i 4 7/26-:~'7,.,.. ,'":-39 CNL-GR I:.,..'IJN i 4-2; 7-29-89 COLi...AR/F:'E:RF RLJN .,, i "=-- 7-26-89 C N i_ '- (.; I";: RUN I 5-i 6 7-,'~ i -89 COLLAR/PERF RUN PLEASE SIGN AND RI:'TUIr(N THE ATTACHED CO%'Y ~ RECEiF"f' OF DA'FA. HAVE A NICE DAY' SALLY HOFFECKER ATO-t ~?o ~ltO~;Oi~98 AF'F'ROVEI ___ ~ -, I'RANS~ 8 A Y'L A,S' ,S' C i-.I s L: A A 1' L A ,ii: A'¥'LA.? A i" i_ ~:::, ::.; A F L,q,:;' DISTRIBUTION CEN'/RAL FIL~'$ ~ F'H ILL'r F'5' CHEYRON PB WELL F It..ES D & M R & D EXTENSION EXF'LORATION ~ BPX EXXON ~ S'f'A'I'E OF ALASI<A MARA'FHON ~ l' EXACO MOBIL_ STATE OF ALASKA A L,-,..,KA OIL AND GAS CONSERVATION COM M I~,.,ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well Change approved program __ Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate __ Pull tubing ~ Variance __ Perforate __ Other 5. Type of Well: Development Exploratory Stratigraphic 9951 CJ - 0360 Service 2. Name of Operator ARCO Alaska, Inc 3. Address P. O. Box 100360 Anchorage, AK 4. Location of well at surface 625' FNL, 445' FEL, 5ec.34, T11N, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, T10N, R15E, UH At total depth 1494' FNL, 1236' FWL, Sec. 3, TION, R15E, UN 12. Present well condition summary Total depth: measured I 231 5 ' ND feet true vertical 91 27 ' T V D feet Effective depth: measured 1 2200 'MD feet true vertical 9037 ' T V D feet 6. Datum elevation (DF or KB) RKB 64 ' 7. Unit or Property name Prudhoe Bay Unit 8. Well number 4-6 9. Permit number 76-83 10. APl number 50-- 029-20111 11. Field/Pool Prudhoe Bay Oil Pool Plugs (measured) N o n e Junk(measured) I 2200' or bel ow (3-1/8" perf gun w/CCL and sinker bar) Casing Length Size Cemented Structural 94' 20" 466 sx Fondu Conductor 21 67' 13,3/8" 700 sx PF I I & Surface 400 sx PF Intermediate 81 85' 9-5/8" 800 sx Class G Production 1577' 7" 364 sx Class G Liner Perforation depth: measured See attached sheet Measured depth True vertical depth I 1 8 'MD 11 8 ' TVD 2191 'ND 2191 'TVD I 1 067 'MD 8209 'TVD true vertical See attached sheet Tubing (size. grade, and measured depth) 5-1/2", 17#, 4-1/2", 12.6# HN-80, BTC tailpipe from 10500'-10625' Packers and SSSV (type and measured depth) R~b~- C, AR rtL, r- f~ 113/,R7' · Cl't''i~ I~PIV C;c,q~l n'~r',nl~ (~ 31RQ' 13. Attachments ' I~escription s~Jmmary of proposal ~ r .De~ail~d 0Per~tions program __ AJaska 0ii & Gas Cons, C0mmissio~. , Anch0ra~ L-80, LTC-Nod tbg f~rom sur"race to 10437' Date approved 14. Estimated date for commencing operation Apri 1 I 989 15. Status of well classification as: Gas __ 16. If proposal was verbally approved Name of approver Oil ~ Service BOP sketch Suspended __ 17. I hereby certify th~41~e f~egoing is true and correct to the best of my knowledge. Signed "~.,~. ~('//'""~'~ Title ~6..~;ono~l E n g i neet ' ' /// FOR COMMISSION USE ONLY ( J C, ) Conditions of approval: Notify ~'ommission so representative may Witness Plug integrity I B(~P/Test ~ Location clearance ~ Mechanical Integrity Test,.,~ Subsequent form required 10- '¢ ~''=' ~ Approved Copy OR'O~.'.'~! SIGNED BY Returned Approved by order of the Commissioner Commissioner Form 10-403 Rev 06/15/88 ,Date ;/~//,~ IApproval NO. y_ ~)/ '.,~ Date SUBMIT IN TRIPLICATE feet DS 4-6 WORKOVER PROCEDURE SUMMARY 1) MIRU WW1. ND tree. NU BOPE and test. 2) Pull BPV. Check well for flow. 3) POOH w/5-1/2" tubing and PBR seals. 4) RIH w/3-1/2" DP and recover PBR barrel. 5) Mill and retrieve permanent packer and tailpipe. 6) Clean well out to PBTD, perform an acid clean up of perforations. 7) Perform an isolation squeeze across perforations. 8) Drill out cement and pressure test squeeze. g) RIH w/new 7" completion assembly and 9-5/8" packer. 10) Land tubing. Set BPV. ND BOPE. tubing and annulus. 11) Release rig. Workover fluid: 8.5 ppg seawater Anticipated BHP: 3825 psi NU tree and test. Displace, test LWK/12 DS 4-6 APPLICATION FOR SUNDRY APPROVALS Block 11. Perforation Depths,,: MD TVD 11652' 11678' 11716' 11788' 11877' 11964' 11986' 12000' 12039' 12095' 12117' 12133' 12148' -11672' -11698' -11770' -11857' -11954' -11972' -11993' -12007' - 12082' -12111' -12127' -12142' -12183' 8633'-8648' 8653'-8668' 8681'-8721' 8734'-8786' 8802'-8860' 8868'-8874' 8884'-8890' 8895'-8900' 8925'-8958' 8968'-8981' 8985'-8993' 8998'-9005' 9009'-9037' SA3/12a ANNULAR PREV6ENTER PIPE RAi'IS 5 BLIND RAI'IS 4 , I TUBIN6 ! 3. HEAD :3 4. 5, 1. 13-3/8" C.~,$1NG .HEAD 2. 9-5/8" CASING HEAD 3. 5000 PS1 TIJB[NG HEAD 4. 13-$/8" - $000 PSI BLIND ~Ai'IS 5 ' 13-5/$" - 5000 oS: 6. 13-5/$" - 5000 DS1 ANNULAR . 10 1i ?4 ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATC~ RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOD PRESSURE IS 3000 PSI WITH 1500 PSi DOWNSTREAM OF THE REGULATOR, 3, OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF, 4, RECC)RD ON THE IAPC PEPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. · BOP STACK TEST FILL BOP STACK Al'ID MANIFOLD WITH ARCTIC DIESEL, CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT ~N WELLHEAD. PUN IN LOCK-DOWN SCREWS IN HEAD, CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. TEST ALL COMPONENTS TO 250 P$~ AND HOLD FC)~ 10 MINUTES. INCREASE P~ESSURE TO 2500 PSi AND HOLD FOR t0 MINUTES. BLEED TO ZERO PSI OPEN ANNULAR PPEvENTE~. AND CLOSE TOP SET OF PIPE RAMS. II'ICI;EASE PRESS. U~E T(') c.-;-,.-..--S! A,~D HOLD FOR t0 MIl.lUTES CLOSE VALVES DiREC T'L? ,JP'ST~EAM OF CHOKES BLEED DOWNSTI~EA; PRESSURE TO ZERO PSi TO TES. T '/AL',,'ES. TEST ~EMAINING UNTESTED MANIFOLD VALVES, IF ANY. 'w'lTM 5gOO PS1 UPSTREAM OF VALVE WiTH ZEPO PSI DOWNS'r~,,E..,,...,', ~,,. ,. ,. ,. ..,c : 'h SYSTEM TO ZERO PSI. OPEN pi~,=_ DAi-!.E.. -_- A,~.: OF: D!?,li',,iij',,I,'..;, JT AND PULL OUT OF HOLE. CLOSE F'LltiD .z, Ar','~. ~,~,D ~E~? 'T';~, 5000 PSt FOR !O I'IINLITES. BLEED TO ZEP. O ~5i, OPEN E, LiND ;'AMS AND DE,:.~O'."EP TEST PLUG MA~E SUITE MANIFOLD ~.? LINES .APE ~UL'. OF ARCTIC DiE'EEL AND ALL VALV. ES APE SET IN D~'ILLING POSITION. TE'~T STAND.~!DE 'v'ALVE'~ TC; 5000 PSI, '-C'~T KELLY COCt ~, '"m ,~ n .. ~,H KOOMEY DUMP ,. ~:~. It.~:,~uE tRC)D TO ,5000 PSi~ "- oEC. ORD T-'_'~T !NF',T;,PMAT~ON '?; '~ '_C"WGUT PREVENTER TEST ~ORM. AND SEND TO D~iL~i,NG uO~ PLE,: B"DPE '~E'~T ONCE A WEEK AND FUNCTIONALLY PERFOP. M' ~'' ~'- .or~.~ I ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMioSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend ~ Operation Shutdown [] Re-enter suspended well ~ Alter casing CJ Time extension ~ Change approved program '~Plugging [] Stimulate [] Pull tubing ~ Amend order [] Perforate ~ Other 2. Name of Operator AP~¢O Alaska,, Inc 3. Address P. O. Box 100360 4. Location 625' At top of 1130' Anchorage~ AK of wellatsurface FNL, 445' FEL, Sec.34, productiveinterval FNL, 1542' FWL, Sec. 3, 9951 0-0360 T11N, R15E, UM TION, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, TION, R15E, UM At total depth 1494' .FNL~ 1236' FWL, Sec. 3, TION, R15E, UM 11. Present well condition summary Total depth: measured 1 2315 'MD feet true vertical 91 27 ' TVD feet 5. Datum elevation (DF or KB) RKB 64 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 4-6 8. Permit number 7R-RR 9. APl number 50-- 029-2011] 10. Pool Prudhoe Ba~/ Oil Pool Plugs (measured) None Effective depth: measured I 2200 ' HD feet true vertical feet 9037 ' TVD Casing Length Size Junk (measured) 1 2200 ' or bel ow (3-1/8" perf gun w/CCL and sinker bar) Cemented Measured depth True Vertical depth Conductor 94 ' 20" Surface 21 67 ' I 3-3/8" P roducti on 8185 ' 9-5/8" Liner 1577 ' 7" Perforation depth: measured true vertical 466 sx Fondu 700 sx PF II & 400 sx P F 800 sx Class G 364 sx Class G See attached sheet See attached sheet 118'MD 118'TVD 2191 'MD 2191 'TVD 11067 'MD 8209 'TVD 10728'-1 2305'MD 7986'-9119'TVD R ECE!V¢D.?. ,__ !. ,':. Gas Cons.. Commission Tubing (size, grade and measured depth)5-1/2,,, 17#, L-80, LTC-Mod tbg t'rom surface to 10437' 4-1/2", 12.6# MN-80, BTC tai]pipe from 10500'-10625' Packers and SSSV (type and measured depth) ~ - ...... ' ............... of "'- ~et~il~-operations ~ BOP sketch ~ 12.Attachments Description summary proposal ~ program 13. Estimated date for commencing operation September 20~ 1988 14. If proposal was verbally approved Name of approver H. Hi ndec, A0666 Date approved 7-11 -88 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢'~0,/ ' LL~.~ ~/ . · ~j~,L..... ~LY~'c .. TitleAssoci ate Enoi n~er Commission Use Only t.Jc~ fiA~/12 Conditions of approval Notify commission so representative may witness '[ Approval No. ~ Plug integrity ~ BOP Test ~ Location clearance I Date Approved by 6fllGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 12-1-85 Approved Copy Returned ,~ . Com,~nisSic~ner by order of the comm, is,s, ion Date 7- / ~"--dr>J-' Submit in triplicate feet APPLICATION DS FOR 4-6 SUNDRY APPROVALS Block 11. Perforation Depths' MD 11652 11678 11716 11788 11877 11964 11986 12000 12039 12095 12117 12133 12148 '-11672' -11698' -11770' -11857' -11954' -11972' -11993' -12007' -12082' -12111' -12127' '-12142' '-12183' TVD 8633 -8648 8653 -8668 8681 -8721 8734 -8786 8802 -8860 8868 -8874 8884 -8890 8895 -8900 8925 -8958 8968 -8981 8985 -8993 8998 -9005 9009 -9037 SA3/12a DS 4-6 APPLICATION FOR SUNDRY APPROVALS ARCO Alaska, Inc. proposes to change the approved prog~ram, dated 11-18-87, as fol lows' (1) MIRU Westward. ND tree. NU BOPE & test to a maximum of 2100 ps.i in order to minimize the shear stress on the tubing hanger support pins. (The BOPE will be re-tested after the 5-1/2" tubing has been pulled.) SA3/12a.2 ARCO A;aska, Inc. Date: June 2, 1988 Internal Correspm. ,ce File code: Subject: MGEVQY G~NERATION I WELLHEADS, MAXIMUM BOB TEST PRESSURE~ TUBING HANGER DESIGN CHANGES From/Location: D. C. Sims/AT0 1482 Telephone: X 4119 To/Location: F i ] e The unique design of the McEvoy' Gen I Unihead tubing hanger landing mecha- nism results in a reduced maximum BOP test pressure when a blanking plug is installed in the tubing hanger and pressure is applied above. The tubing hanger lands on four (4), 1.75" OD support pins in the tubinghead. The pins have a maximum shear strength of 100 KSI when new. Assuming a safety factor in shear of 2.0, the maximum allowable shear stress for each support pin is 50 KSI. An example calculation of maximum allowable BOP test pressure with a blanking plug installed is given below. Note that the maximum test pressure will vary with tubing string weight. Buoyed Tubing String Weight : 90,000 lbs. (4000' of 7" 26# in seawater) Tubinghead Profile ID-- 13.6 in. Max BOP Test Pressure = [4((50,000 lb./in2)(~r (1.75 in.)2/4)) - 90~000 lb.~ ( ¢r (13.6 in. )2/4) Max BOP Test Pressure = 2700 psi Due to this limitation, it is recommended that future workovers** of McEvoy Gert I wells include a modification of the tubing hanger landing mechanism that will eliminate the use of the tubing hanger support pins. Instead, a tubing hanger support bushing will be designed to land in the profile below the tubinghead and provide a landing shoulder for the tubing hanger. In cases where a casing string is already landed in the profile below the tubinghead, a smaller support bushing will be designed to land on the casing pack-off and provide a landing shoulder for the tubing hanger. In each case, the tubing hanger will have to be modified slightly to land on the support bushing rather than the support pins. Specifications for the tubing hanger support bushing and the modifications to the tubing hanger are available from Cameron/McEvoy. All machine work can be done in Anchorage, however, the 4130 steel necessary to machine the support bushing will likely have to be ordered. Questions 'or comments should be directed to Pete Thompson, McEvoy (562-2332} or Tom Taylor, McEvoy-Houston (713-939-2053). ** DS 1-~thru 1-6, DS2-2 thru 2-~, DS 4-1 thru 4-6, PWDW 1-1, PWDW2-1. , _.....~. _1'1 ngineer ' ~ ~ iZL.~ DCS:hf(DCS/35) xc: Workover Engineers £~n~ E. K. White/ATO 1476 W. R. Worthington/ATO 1468 ~I !:l,~ruru D ~D~-~.~hru 2-6 The unique design of the M~,,_VOY GEN I Speedhead Tubing Hanger ,. Jing mechanism results in a REDUCED MAXIMUM BOP TEST PRESSURE when a blanking plug is instaled in the tubing hanger and pressure is applied from above. ( refer to attached letter dated June 2, 1988 · McEVOY Generation I Wellheads, Maximum BOP Test Pressure, Tubing Hanger design changes) L 4.500" J F -I Cross Sectional Area: Mud Gradient: Depth: Buoyancy: (~4) x [(4.5 in)2 - (3.958 in)2 ] - 3.600 in2 (8.5 ~b/ga~) x (0.052) = 0.442 psi/It 10,625 FT M D (-0.442) x (10,625) x (3.600) =- 16,907 lb String Weight: 5-1/2"' (10,500 FT) x (171b/FT) = 178,5001b 4-1/2": (125 FT') x (12.6 Ib/FT) = 1,5751b Gross Weight: (178,500 lb) + ( 1,575 b) = 180,075 lb Net Weight: ( 180,075 lb) - (16,907 lb) = 163,168 lb MAX BOPE TEST PRESSURE: [ 4 [ ( 50,000 lb/in2) (r,./4) (1.75 in)2 ] - 163,168 lb ] / (re4) (13.6 in)2 - 2188 psi 1U-D/D" ..5000 PDI BOP 5TACK, ANNULAR PREVENTER 2 I TUBIN6 3 HEAD 5, 1. 13-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3, 5000 PSI TI_IB!N.'._-~ HEAD 4. 13-5/8" 5000Pol EL' a - " ,N.~ ~Ai"IS 5. t3-5/$" - EiC00 PS: PiPE RAMS 6. 13-5/8" - 5000 PSI ANNULAR !0. 1i. ACCUMULATOR CAPACITY TEST I. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPERLEVEL 'WITH HYDRAULIC FLUID, 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSt WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. s. O~SE~VE ~'~, mE~ CHOSE AbL U~*S S~UbT~[OUSLV ~ECO~D T~E ,~[ A~D P~ESSU~E ~E~,~ ~r~ ~b U~rS ARE CLOSED WITH CHARGING PUMP OFF, 4. RECORD ON THE IADC PEPORT. THE ACCEPTABLE LOWEP LIMIT ~s 45 s[co~os cbos~ Z~ME ~ ~20o PRESSURE. ~<~ ~ ~... ~ ~ ~ ,~ , ~.,~ ~, G~s Cons. BOP ST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. CLOSE ANNULAR PP. EVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. TEST ALL COMRONEN~e TO 250 PSI AND HOLD FOR 10 MINUTES INCREASE PRESSURE 70 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE PAMS. ~ro~e~ PRESSURE TC)=a,'~0 ;'S' ' , , ............ ._,.. ; AND HOLD FOR ~0 MINUTES CLOSE VALVESDiRECTL'~ uPST~.EAM OFCHOKES. BLEED DOWNSTPEAP: PRESSURE TO. ZERO PSi T"~_ TEST. ',~..~'.,'~. TEST ~EMAINING UNTESTED MANIFOLD VALVES. iF ANY, 'W!TM 5000 PSI UPSTREAM OF VALVE AND WiTHZEPOPSIDOWNS.~S]EAM ~LEEDSYSTEM TOZEROPSI. (':'PEN PiPE sAMS. E. AC~OFF PLm~NiNG JTAND PULL OUTOF HOLE. ....... ~..~ ,c ~.~ ST T(; .,v')0 ~ r, MINUTES BLEED 70 ZERO PSi. OPEN E..~ ND PAMS, AND RECC:'VEP TEST PLUG. MAKE SUPE MANIFOLD LINES APE :iJLL OF AR(.T:C DIESEL AND ALL VALVES APE SET IN THE TE'~,T STANDPIPE VALVES TO 5000 PSI. 7EST KELLY CGC~':S .A~;D iNSiDE BOP TO 5000 ~Si WITH KOOMEY PUMP ~EC. ORD 7~ST !NFOPMAT*C'h '7i E~OWOUT PPEVENTEP TEST FORM. PERFORP'I COMPLETE BOF'E 7EST ONCE A WEEK AND FUNCTIONALLY JG NOVEMBER 21, 1956 STATE ANNULUS TESTtNG DATABASE FOR PRUDHOEtUSBURNE INJECTION WELLS tg88 ANNULAR TESTS TUglHG PACKER TEST LAST TEST WEI~, ANHULUS .FL.,pm __ SIZE_ M,D'/TVD' CASING PRESS. DATG = 4:....6 ...... _'~O_ _t~_. fl.i~ + 10_.4..CaCl2. 5-$t2" 10487'/7834 G-5/8', 47#, MH-80 1500 lt8/88 / . - - 8705-e4e2 9-.5/9-, 47#, L..80 NSCC ks 2200', N..80 io 7084' 2493 3./30/6.8 ~ 2-718' 9569/8575 9-5/8', 47#, L-80 3104 3t6186. .HG~,_~,~ L [51 ht~d~+9.4NaCt .... 7' 8086/7426 9-5/6', 47~1, MN-80 1950 2/8t88' 5-1,'2" beirut' Page 8 Revised 41i4/88 ARCO Alaska, Inc. Prudhoe Bay ~-.gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 11, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 Subject- DS# 4-6 Permit No. 76-83 Dear Mr. Chatterton: Attached is the Application for Sundry Approval to resume produced water injection into Well 4-6 as required per Rule 7 of Area Injection Order No. 4. Very truly yours, Attachment Standard Alaska Production Co. L. L. Gantt, ATO 1520 J. W. Groth, ATO 1570 G. D. Herring/H. G. Limb, PRB 24 T. G. Zibell/J. D. Ottoson, PRB 24 PRB Files (4-6) Oper. Eng. Files (4-6) Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B 6132-C STATE OF ALASKA ALASK.. OIL AND GAS CONSERVATION COMN,._,SION APPLICATION FOR SUNDRY APPROVALS 1..Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well L-] Alter casing El Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order Fl Perforate ti~i] Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 Location of well at surface 625' FNL, 445' FEL, Sec. 34, T11N, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective-depth 1437' FNL, 1284' FWL, Sec. 3, T10N, R15E UM At total depth 1494' FNL, 1236' FWL, Sec. 3, T10N, R15E, UM 5. Datum elevation (DF or KB) 64' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-6 8. Permit number 76-83 9. APl number 50-- 029-201 11 10. Pool Sadlerochit 11. Present well condition summary Total depth: measured true vertical 12315 feet Plugs (measured) None 9127 feet Effective depth: measured true vertical 12200 feet Junk (measured) 9037 feet 12200' or below (3-1/8" perf gun w/CCL & sinker Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length 94' 2167' 8185' 1577' measured true vertical Size Cemented ~ ~ ~ ~ ~ ~¢ depth True Vertical depth 2 0" 466 sx Fondu ~" '" !,: i~i ' .'i 1 1 8' 11 8' 1 3-3/8" 700 sx PFII/400 sx PF~ ~-:'~ i''i ~' 21 91 ' 21 91 ' 9-5/8" 800 sx G A~icho~'a~e 1 1 067' 8209' 7" 364 sx G 1 0728'- 12305' 7986'-9119' A total of 375' of perforations in 13 separate intervals exist between 11652' & 12184' MD. (8620'-9025' TVD) Tubing (size, grade and measured depth) 5-1/2", 17#, L-80, LTC-MOD tubing from surface to 10437' 4-1/2", 12.6#, MN-80, BTC tailpipe from 10500'-10625' Baker SAB Packer @ 10487' Packers and SSSV (type and measured depth) Otis RQY SSSV Nipple @ 2189' 12.Attachments Description summary of proposal J~ Detailed operations program iJ BOP sketch 13. Estimated date for commencing operation Resume produced water injection on 1/9/88. 14. If proposal was verbally approved Mike Minder Name of approver Date approved 1/8/88 15. I hereby pcrtify that the foregoing is true and correct to the best of my knowledge Signed ,¢~,j~ J~2~~ Title Operations Engineering Manager Conditions of approval Approved by Date ~;~/~'¢ Commission Use Only Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI ~ Approvecl Copy ORIGINAL LONNIE O, SMITH Commissioner by order of the commission Date Form 10-403 Rev 12-1-85 ,-~ ~ 2,1 ~) Submit in triplicate INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: TIME: NOTIFIED BY: REASON: 1/8/88 1030 hrs Pam Pierce Injection Well 4-6 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 AOGCC CONTACT: Mike Minder DISCUSSION: Informed AOGCC that well h~.d passed MIT conducted 1/8/88 and requested approval to resume injection until workover operations to repair the tubing leak commenced. It is apparent that previous attempts to get a successful MIT, failed due to leakage by the tubing plug. The tubing pressure remained at 1700 psi, the 9-5/8" at 1520 psi~ and the 13-3/8" at 370-375 psi during the 30 minute test. AOGCC RESPONSE: Approval given verbally to resume injection for one week with a formal request to extend injection required for additional injection past one week. Sundry Notice Req'd at this time? YES X NO~ SIGNED: (~--,~~ I- /1- ~ (~ PRODUCTION SUPPORT SUPERINTENDENT Original: G. D. Herring/H. G. Limb - PRB #24 cc: Production Support Superintendent (P. S. Pierce/E. W. Skaalure) - PRB #20 Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB #20 Field Area Operations Engineer (J. D. Ottoson/T. G. Zibell) - PRB #24 ( 1 2- 1 0 - 8 7) DS Supervisor - FS #?._ FS Superintendent - FS #~2 DS Engineer - ATO /58(, ARCO ALA2KA, P., 0., BOX ANCHORAL, E, AI...A2KA 995t0 DAI"E · t 2-3t -87' REFrERE-.NCE' ARCO CA2ED HOL. E FINAl... "~~::: t 2-24-87 NOT2E.. LOG RUN t , .,...'~' tt-9 t''~ ~-_-~,..5-87 F'I..IMF'-IN TEMF'ERATLIRE ,~IJRVEY RUN 2, F'I...EA2E 2IGN AND RETURN THE ATTACHED COF'Y A,.? RECE.TF'T OF DATA., RECEIVED BY HAVE A NICE DAY! PEGGY BENNETT AT0-i529 TRAN$ ~877t8 APPROVED Alaska Oil & Gas Cons. Conlmissian Anchorage DI2TRTBL.ITTON 2CH CENTRAl... F!!...E:2 CHEVRON D & H EXTEN2ION ...FYPI...ORATION EXXON MARATHON PI-'! I L.t... I P,.S' F'F~ WEI...I.. F.T.I..EX 2AF'C ,.gl'ATE .OF AI...A,S"KA T .F;XACO STATE OF ALASKA AL,. XA OIL AND GAS CONSERVATION CO,.,,,41SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend ~ Operation Shutdown F~ Re-enter suspended well ~ Alter casing Time extension © Change approved program [] Plugging [] StimulateX Pull tubing ,~ Amend order ~ Perforate ~ Other.~ 2. Name of Operator :i 5. Datum elevation (DF or KB) ARCO A 1 a s k a, I n c. ~ 1~ ~ Integrity Test RKB 64 ' feet 3. Address 6. Unit or Property name P. O. Box 100360 Anchorage, AK 99510-0360 Prudhoe Bay Unit. 4. Location of well at surface 625' FNL, 445' FEL, Sec.34, T11N, R15E, UN At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, TION, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, TION, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, TION, R15E, UM 7. Well number 8. Permit number 76-83 9. APl number 50-- 02~-20111 10. Pool Prudhoe Ba.y 0il Pool 11. Present well condition summary Total depth: measured true vertical 1 231 5 ' MD feet 91 27 ' TVD feet Plugs (measured) None Effective depth: measured 1 2200 'MD true vertical 902,7 ' TVD Casing Length Size Conductor 94 ' 20" Surface 21 67 ' 13-3/8" Product i on 81 85 ' 9-5/8" Liner 1577' feet feet Junk(measured) 12200' or below (3-1/8" perf gun w/CCL and sinker bar) Cemented Measured depth True Vertical depth 466 sx Fondu 118'MD 118'TVD 700 sx PF II & 2191 'MD 2191 'TVD 400 sx PF 800 sx Class G l1067'MD 8209'TVD REC I¥ V Perforation depth: measured See attached sheett~.~~'~,_~ iCjIl( NOV ], I true vertical See attached ~heet C~daska Oil & Gas Cons. Anchorage Tubing (size, gradeand measured depth) 5-1/2", 17~, L-80, LTC-Mod tbg from surface to 10437' 4-1/2", 12.6~ MN-80, BTC tailpipe from 10500'-10625' Packers and SSSV (type and measured depth) Baker SAB pkr ~ 10487': Otis ROY SSSV ninnle ~ 21B9' 12.Attachments Descripti6n summary of proposal~ Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation December 20, 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed [~z,,/~J')'L.. ~4.1!./,.Lt~ / Title Associate Enqin~r (~ ~ Commission Use Only ( J G i ,~A 3 / 1 2 Conditions of approval Notify commission so representative may witness J Approval No. /V~d[$ ~ t"7'- [] Plug integrity [] BOP Test [] Location clearanceJ ..... Approvedby ~/~ J//~' D.ate ///-J8-~7' ~ S i//o//n e ~ ':r-7~r d e r of the commission Date iiI I ~ I~':F- Submit in triplicate~. Form 10-403 Rev 12-1-85 DS 4-6 APPLICATION FOR SUNDRY APPROVALS Block 11. Perforation Depths: MD TVD 11652 -11672 11678 -11698 11716 -11770 11788 -11857 11877 -11954 11964 -11972 11986 -11993 12000 -12007 12039 -12082 12095 -12111 12117 -12127 12133 -12142 12148 -12183 8633 -8648 8653 -8668 8681 -8721 8734 -8786 8802 -8860 8868 -8874 8884 -889O 8895 -8900 8925 -8958 8968'-8981 8985'-8993 8998'-9005 9009'-9037 SA3/12a DS 4-6 WORKOVER PROCEDURE SUMMARY 1) MIRU WW1. ND tree. NU BOPE and test. 2) Pull BPV. Check well for flow. 3) POOH w/5-1/2" tubing and PBR seals. 4) RIH w/3-1/2" DP and recover PBR barrel. 5) Mill and retrieve permanent packer and tailpipe. 6) Clean well out to PBTD, perform an acid clean up of perforations. 7) Perform an isolation squeeze across perforations. 8) Drill out cement and pressure test squeeze. 9) RIH w/new 7" completion assembly and 9-5/8" packer. 10) Land tubing. Set BPV. ND BOPE. NU tree and test. Displace, test tubing and annulus. 11) Release rig. Workover fluid: 8.5 ppg seawater Anticipated BHP: 3825 psi LWK/12 ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 1. !3-3/5" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSt TLIBIN~ HEAD 4, 15-5/6" - 5000 PSt BLIND RAi~fl3 5. !~-5,/8" - 5000 PS! P,DE 6. 15-5/8" - 5000 PSI ANNULAR . , !0 ACCUIVlULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUhtULATOP PRESSURE IS 5000 PSt WITH 1500 PSt DOWNSTREAM OF THE REGULATOR. 5, OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC i~EPORT. THE ACCEPTABLE LOWER LIMIT 1S 45 SECONDS CLn~'' ._,~,~NG TIME AND 1200 PSI REMAINING RIiCEI /EI) BOP c T ACK $~il & Gas 6o~s. Anc,,or g FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. CHECK ~HAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAt TEST PLUG WiLL SEAT ANDSEA~ iN WELLHEAD. RUN tN LOCK-DOWN SCREWS tN HEAD, CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE r!ANIFOLD. TEST ALL COMPONENT3 TO 250 PSi AND HOLD FOR lO MINUTES. INCREASE PRESSURE TO 3500 PSI AND HOLD FOR ]0 rtlNUTES. BLEED TO ZERO PSt. OPEN ANNULAR PREVENTER AND CLCGE TOP SET OF PIPE RAklS. ~NCPEASE, ~_ ~¢~._.,,~~m:c~t ~o~ TC~.. ~,r~qO_... :-':~'~' ~ND HOLD FO~ ~0, MINUTES ('LOSE VAL/lc, ulRECTL', uPST~EAi'I OF CHOKES BLEED DOWNSTPEA;'; PRESSURE TO ZERO PSi TO TEST VALVES. ~ESTPErdAINING UNTESTED MANIFOLD VALVES. !F ANY. 'WITH 500~ PSt UPSTREAIfl OF VALVE ~ND WiTH ZEP. O PSI DOWNSTP. EA~'!. ~'..LEE3 SYSTE~ TO ZERO PSI. (';'PEN PiPE PAl%. 5A,;C~ OFF PL.~NNCN(~ JT AND PULL OUT OF HOLE, CLOSE E;.L~ND ~..Ai":3 AhO TES:T T(;. 50?0 PS! FOR ~0 ["iINIJTES. BLEED %0 ZERO PSi. OPEN E;LiND P.A~I?; AND PECOVEP~ TEST PLLIG. r'iAKE SURE ~IANIFOLD A. ND LINES APE FiJLL OF ARtCTiC DiE:SCL AND ALL VALVES ~.RE SET ~N THE DP~LLtNG ...... TEST STANDPIPE VALVES TO 5000 PSI. ~ ~ ~ T K E L L Y' C OC i(. ~; ~ ~ .... F~ q i D F T 0 .... ,,~, ! .... BOP 5000 PSi WITH KOOHEY P!jhlP RECORD TEST !NFOPr"IATiON ';)N ELOWOU% P~EVENTE~ TEST FORtl. ~,.,~* ~ SEND TO D~iLL ~NG, q_ _!PFR'_ ,"' SOR, PERFORPI COMPLETE 6OPE TE3, T ONCE A WEEK AND FUNCTIONALLY OPEPATE BOPE DAILY. d(3 NOVEI~IBER 21, ~'}$6 ARCO Ala.ska, Inc, ,--- P.O, Box ~(~O~&O Anchorage, Aia.ska '>'V5t(.) DATE: ~-'28'"87 REFERENCE: ARCO Pressure Data t5-tt 9-2t-87 £tatic Gradient C,!:mc o 6-tEl 8-29-87 Static Gradient Camco 4-t2 9-7-87 ~tatic Gradient 0$i.~' 4--38 9-7-87 $'$a~ic Gradieot 05i~ 4-6 9-7-87 Static Gradient I'!'l i.s' PLease .~ign and return the attached copy a.s receipt of data, Received By. HAVE A NICE DAY! Recordz Proce~zor A1'0-.t529 T~ANS ;~-87500...~.~. Approved ........ DItTR:~ ~."~i I, ON Central Fi [es ~- F'hi [I. Chevron PB Well Fi les · ~ I) & M ,. R & D Ex ten.s' i on Exp [oration , ,S'~ P C · ,.~ Exxon ~'. ~ate of ~La~ka Marathon ~ Texaco · ~ Mob i [ ARCO Alaska, In Prudhoe [~ Engineering Post Office Box '~00360 Anchorage, Alaska 99510-0360 Telephone 907 ;263 4248 Donald F. Scheve Operations Engineering Manager September 9, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject- DS #4-6i Permit No. 76-83 Dear Mr. Chatterton' Attached is the Application for Sundry Approval as required per Rule 7 of Area Injection Order No. 4 for the above referenced well. Very truly yours, D. F. Scheve DFS4/12'cb Attachment cc: Standard Alaska Production Company L. L. Gantt, ATO 1520 J. W. Groth, ATO 1576 H. G. Limb/G. D. Herring, PRB 24 PI(DS#4-6i )W1-3 ARCO Alaska, inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA AL,. ,<A OIL AND GAS CONSERVATION CO,,.,vllSSlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well E] Alter casing Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order E3 Perforate [-3 Other X] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO ALASKA, INC. 64' RKB feet 3. Address 6. Unit or Property name P. O. Box 100360, Anchorage, Alaska 99510 Prudhoe Bay Unit 4. 7. Well number Location of well at surface 625' FNL, 445' FEL, Sec. 34, TllN, R15E, UM At top of productive interval 1130' FNL, 1542' FWL, Sec. 3, T10N, R15E, UM At effective depth 1437' FNL, 1284' FWL, Sec. 3, T10N, R15E, UM At total depth 1494' FNL, 1236' FWL, Sec. 3, Ti0N, R15E, UM 4-6L 8. Permit number 76-83 9. APl number 50-- 029-20111 10. Pool Sadlerochit 11. Present well condition summary Total depth: measured true vertical Effective depth: measured (coiled tubingTM vertical measurement ) Casing Length Structural Conductor 94 ' Surface 2167 ' Intermediate 8185' Production Liner 1577 ' Perforation depth: measured true vertical 12,315 feet 9,127 feet 12,200 feet 9,037 feet Size 20" 13-3/8" 9-5/8- 7~' A total of 375' between 11,652' Plugs(measured) None Junk(measured) 12,200' or bel ~) k ]' lDO/ (3-1/8" perf gun w/CCL and s Alaska ~)~]~e~~. Commil Cemented Measured depth Tr u eA~;;~ed e pt h 466 sx Fondu 118' 118' 700 sx PFII/ 2,191' 2,191' &O0 sx PF 800 sx G 11,067' 8,209' 364 sx G 10,728-12,305' 7,986-9,119' of perforations in 13 separate intervals exist and 12,184' MD. (8,620-9,025' TVD) Tubing (size, grade and measured depth) 5-1/2", 17#, L-80, LTC-MOD tubing from surface to 10,437 4-1/2", 12.6#, MN-80, BTC tailpipe from 10,500-10,625' Packers and $$$V (type and measured depth) Baker SAB Packer @ 10,487' Otis RQY SSSV Nipple @ 2,189' 12.Attachments Description summary of proposal [] Detailed operations program E-~ BOP sketch ~] 13. Estimated date for commencing operation NA 14. If proposal was verbally approved Name of approver Mike Mendor Date approved 8/3/87 15. I hereby ce_rtify that the foregoing is true and correct to the best of my knowledge Signed ~/~j~~ Title Operations Engineering Manager . Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance I Date y,~/F',> Approved by ¢.~,, ~,~:.;~ Form 10-403 Rev 124-85 Commissioner by order of the commission Date ~--'~'¢ "/ Submit in triplicate DOCUMENTATION OF VERBAL NOTIFICATION OF AOGCC DATE: 8/3/8 7 TIME: 2:00 P.M. NOTIFIED BY: E. Skaalure AOGCC CONTACT: Mike Mendor REASON: Injection Well 4-6 Annular Communication Per Rule 7 Requirement of Area Injection Order No. 4 DISCUSSION: Informed AOGCC that PWI injector 4-6 has a tubing leak and probable packer leak as diagnosed by temperature logging & pressure testing conducted on 7/31/87. AOGCC not notified earlier because of weekend. AOGCC had previously been notified of a potential annular communication problem on this well and that diagnostic work would be undertaken. Verbal approval was received at that time to continue injection operations until diagnostics could be completed. Informed AOGCC that well 4-6 was currently loaded with water and freeze protected, and would remain shut-in until a workover could be conducted. Mentioned that we currently had no plans to kill the well, but would continue to monitor the tubing & casing pressures to verify static wellbore conditions. AOGCC RESPONSE: Approved of steps taken to shut-in & secure well. Requested that Sundry Notice be filed to formally document the well's current condition and our plans for repairing the well. SundrY No~ce[l~~eq'd at this ti e? YES ~ cc: DS Supervisor NO FS Superintendent Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) Field Area Operations Engineer (J.D. Ottoson/T. G. Zibell) Annular Communication Specialist (G. D. Herring/H. G. Limb) Verbal Not.-AOGCC ARCO ALaska, Inc. F'.O. Box t~JO36e Anchorage, ALaska REFERENCE' ARCO Cased HoI(~ ~j'YIoI. t--2<? 8-8-8? -Prod, Pro'fi Le Run i-SO 8-9-8? F'rod, F'rofi le Run t'-3~ 8-..~--87 Prod, F:'ro'fi te Run ~-S2 8-.~-87 F'rod, F'rof~ Le Run t'-~ 8-.9-87 F'rod. F:'rofi Le Run S.-9 8-t 6-87 l'emp, Log Run T~----27 8--~-87 Prod. F'rof~ Le Run 4'--S 8--t6-"87 F'rod. F:'rof i Le Run 4.--6 7/S~.-8/t/87 Leak Det~/Temp/FLowme~er R~n 4-.27 8-6...-87 Inj. Profi Le/Temp~/FLowmeter Run ~ S~. 8-~6'-87 Pr'od ProfJ i.e Run 5.-..2 8/t .... 2/87 Leal< Det/'l'emp. Log Run 7 -- 2 S 8 -' ~~.-~ '~ q "'. F L o w m e 'f e r R u n 9-1 8-. t 7- 87 X- Y C a L i p e'," R u n 9--S 8-tS-87- Prod. Pre, fi Le Run 9- 8 8-7- 87 I n .j. F:' r o f i L e / T e m p. / I= L o w m e t e r R u n 9 .... ~8 8-7-87 Inj. Profi Le/Temp~/FLowmeter Run 9..- S ~ 7-. 29 -.- 87 Pr o d ~ P I" o 'f i L e R u n , & 5" &5" .?ign and return the a!!ached copy as rec:eip~ of data. '.; N .Ii: C e r, +. r a L F i L e 5' :',':F:' h i !. L i r-:, s' :,~ C h e v r ,c:) n F' B W e !. I. F:' i I. e I.~ A, M R ~, I) · ,.'"' E x 'l' e n .'..~ i c:, 'n Iii x I:) I. o r a t' i o 'n :',; ,!';' (::, h i o ,11, · '".,,. E x x ,:.:'., n .,~ S.. t a t r;'-,_ o f A L a .s I< a .11, M a r a .1: h o n ... 'f' e x a c o · "'.,,. M o b i L ARCO Alaska, Inc. Prudhoe Bay ~-ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 15, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-6 Permit No. 76-83 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp At t a chment cc: Standard Alaska Production Company Pi (DS 4-6)W1-3 WELLS/58 ARCO Alaska, ]nc. is a Subsidiary of AtlanticRichfieldCornpany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMiv,~SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well EJ Alter casing [1 Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order Iq Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 625' S & 445' W of NE Ct, Sec. 34, TllN, R15E, UM At top of productive interval 1130' S & 1542' E of NW Cr, Sec. 3, T10N, R15E, UM At effective depth At total depth 1494' S & 1236' E of NW Cr, Sec. 3~ T10N~ R15E~ UM 11. Present well condition summary Total depth: measured 12315 feet Plugs (measured) true vertical 9127 feet 5. Datum elevation (DF or KB) 64 'REB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 4-6 8. Permit number 76-83 9. APl number 50-- 029-20]]1 10. Pool Prudhoe Bay Oil Pool Effective depth: measured 12222 feet true vertical feet 9054 Casing Length Size Structural Conductor 118' Surface 2191' Intermediate Production 11067 Liner 1577' Perforation depth: measured 11652-12184' true vertical Junk (measured) Cemented 20" 466 Sx 13-3/8" 700 Sx & 400 Sx 9-5/8" 800 Sx 7" 364 Sx Measured depth True Vertical depth 118' 118' 2191' 2191' 11067' 10728-12305' 8209' 7986-9119' 86~21.-9025 ' ~uo~ng ts~ze, grade and measured depth) 5~" a 17# MN-80 ,10625' ~ Packers and SSSV (type and measured depth) Baker SAB Packer ¢ 10487' ~ Oti~ RQY gggV ¢ ?lgq'~ 12.Attachments Description summary of proposal 13. Estimated date for commencing operation 5/1/87 14. If proposal was verbally approved Name of approver Date approved 15. I hereb~/~rtify th%,~ f~_ o~ is tr~ue and correct to the best of my knowledge Signed ,~-/~,,¢ ~ ,~ ~ __, Title Operations Engineering Manager Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance I Date Approved by ~,~.,CZ ( Form 10-403 Rev 12-1-85 -- f // / Commissioner the commission Date Subrn, Ft in t, fiplicate DS 4-6 CTU sOUEEZE PROCEDURE AFE 794392 ~ 3, 4~ 5, Tag PBTD. Last PBTD was 12172 on 3/16/87. Stop injecting produced water umtil after squeeze. Rig up coiled tubing unit. Clean out fill to top of fish 12195'. Lowest perf ~s ]2]84'. Perform bioctde treatment at end of fill cleanout. Acid wash perforations 11652-12184'. Ensure well is fluid packed before pumping cement. Pump 48 bbls cement down CT. 6, 7, Pressure up on squeeze to 5200 ps~ BHP and hold for 45 minutes. GIH contaminating cement to PBTD. Slowly bleed wellhead pressure while contaminating to leave a minimum of 200 psi differentia] into the formation. , WOC a minimum of 12 hours. Reverse out contaminated cement. protect and leave positive pressure on the well. 9, Wait at least one week prior to reperforating. 10. Nitrogen lift top 2000' of fluid for drawdown during perforating. 11. Reperforate only the three lowest intervals: (Ref: BHCS 12/15/76) 12117-12127' 4 spf Lower Romeo 12134-12143' 4 spf Lower Romeo 12149-12184' 4 spf Lower Romeo 54' Freeze 12. Evaluate injectivity into Lower Romeo. Perform stimulation if necessary. (Separate AFE.) 13. Reperforate Zulu, Victor, Tango and Upper Romeo intervals: (Ref: BHCS 12/15/76) 11652-11672'' Limited shot density 11678-11698' ,, 11716-11770' ,, 11788-11857' ,, 11877-11954' ,, 11965-11973' ,, 11987-11994' ,, 12001-12008' ,, 12039-12082' ,, 12095-12111' ,, Zulu Zulu Upper Victor Upper Victor Lower Victor Tango Tango Upper Romeo 14. Place well on injection. 15. Run post squeeze injection profile survey. AFE2/98 6 5 4 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 1 i! COILED TUB I NG UN ! 'I' BOP EOU I PMENT 3 1. 5000 P.~ '7" W£LLHE..A~ ~)NN£CIOR FLANGE 2. 5,000 PSI WIRE. LINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 *1/6" LUBRICAIOR 4. 5000 PS~ 4 1/6" FLOW lUBE PACK-Orr H ! REL ! NE BOP EQU ! PI,tENT ARCO Al.~.s'l<a, In I::',,0, Box t(-)036,0 Anc:horage, 99.5t (~ [)ATE' March 2'7, i987 R E F' E R E N C E ' A R C 0 C a s' eci H c', i. e F' i n,~ L S -. t 4 ~."~, - t 6 -' 8 '? !'-'-' r o cl ~ c t i o n F:' r o f i !. e R u n t , _,~'".'" .... '/" ~ 5" 4 .... 4 S-t S.--87 (.~F,., CCI._ Run i , 4---6 :3-t6-8'? ]:nj. F:'rofi I.e Run t, 5" 4-t:3 3.-tS-8'? Inj, F'rofi te Run t, 5" ~-'1~ :3 .... t5-87 I::'u. mp In Temp, I..og Run t, .~':~'" '7-t S-'F-8'F ~:pinner/F'Luid Den.s'ify Run t, 5" 7.-.-2 S-6..-.87 ~:/p inner/FLuid Density Run 7- 5 ;5.'- 8-- 87 ,S'p i n n e r R u n t, 5" 7 ..-. 6 ~"~ '-- 9 -8 '? ~'" p i n n e r / T e m p. R u n t , ~" '7-9 S--.6-87 .~pinner/Fl. uid Dens;ify Run t, 5" 7 .... t0 :3....8--.87 i:pinner/Temp. Run t, D" 7'- t 7 [~ "" t ~ "" 8'F e I" 0 d u c '1' i o il f y' o f i J. e R u n t , 5" '7 .... i8 :3'-"9-87 ~'pin'ner/FI.u. id l)en~ity R~ln t, 5" t :~... - 2 t :~-' t .~ '')- ,~o",, I n j ,- P r o f i L eR u n t , ~" t4-4 S-22-...87 'l'emp/FI. owme'~er/FLL~id Density Run ~ ..z . , , '.5" t fJ -- ,, ~- i 4 - 8 '7 I.. e a k g e t' e c '[ / D i f 'f, T e m p / f L o w R u n I , I::'l. ea.~e ~ign and ret.'urr~ 'the ,.'.~t~'l:.ac:hecl~)y as'~"ec:eip't of data, HAVE: A NICE D~'Y~ / ~ Alaska 0ii & Gas R o s' a n n e F:'e e k Anch0mge A l" ri_ .... i ':~:.,~.. ''~ o, :Il: C e n t: r a L F:' i L e .'.; :',': i::' h i I. L i 1::' .~ '"'.,. C'. h e v r (-', n F:'B W e !. I. F' i !. e..s' I)....~., M t:;.: & D · "' E x t' e n :!.;' i o n E x p !. o r a 't' i o n .,~ ........ ~, o I'1 i o '11' .. ...... '"' E x :" :,.,: · ,,. x. o',", :..,., 't a '!.' e'-"C~:f :'iA' L'a~ I<'a ,. M ,':~ r .:.'~ t' h o n :~J: '¥ e x .:':'~ c o "' i"i c,l:) i L '11' Ar, chorage, A~m,ska DATE' Apri[ 7, 1986 F;,' E F: ...... ' '"" "" ' ' "'" .. EI",I=.~,~CE AI",CO .Ca s'r.,d Il; a m,:.:: o (; o C a m c: o C a m ,:.': ,:.:) C a m c o C 8 ~11 c o C a m c o D I £ T F;.'. I B U T 3:0 N .1t. · .. C.': e'n '!' r a I. I::' i !. e :....': :,'.J:C: h e v r o 'n D & H · ,,. E: x t.. e'n.'..:: i (::, 'n Iii: x 1::' i. o r a 't' i o'n .1t. · ,- Iii] x x c, n ~," -I: I'l 0 n I I.::l i" 8 .Ih · ,. H c.', !", i I. .11. · ,,. F' I"~ i I. L il::' .'..; f:'D WeLl. I::i I. es' R & D · '".,,- 3: o h i o :J~ ,'.";: t' a t: e c, 'r A !..m .'..r I< a .,. T e X ;~ C 0 ARCO Alaska, Inc; Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date.: January 29, 1985 Reference: ARCO CH Finals ~4-6 Prod. Loggoing Svs. 12-27-84 #1 DA 5" 1-9~' Production Profile 1-3-85 #1 Camco 5" 12-19Injection Profile 1-2-85 #1 Camco 5" ..... 4-14 Spinner 12-16-84 #1 GO 5" 18-3 Prod. Logging Svs. 1-10-85 #1 DA 5" 4-4 Spinner 12-15-84' #1 GO 5" 1-9 CNL 12-20-84 ~1 GO 5" 15-9-Depth Determination 11-9-84 ~1 Sch 5" ,~2-22Perf. Record 11-29-84 ~1 Sch 5" 12-28Perf Record 12-3-84 ~1 $ch 5" -~-17 EPL 10-4-84 31 Sch 5" 12-27Perf. Record 12-1-84 ~1 Sch 5" .4-8 Spinner 12-27-84 ~1 GO 5" 4-15 Spinner 12-16-84 ~1 GO 5" 6-3 Spinner 12-21-84 ~1 GO 5" -~t3-18Spinner 12-26-84 ~1 GO 5" '6-3 Diff. Temp. 12-21-84 ~1 GO 5" __~--15-9 Collar Log 12-2~-84 ~1 GO 5" _~2-15 Temp. Survey 12-24-84 #1 GO 5" and return tha attached copy as receipt of data. Received by Pam lambert ATO i429C Chevron D & M Exploration Services Extension Exploration Texaco Marathon Mobile Mmbile E & P Phillips Prudhoe Bay Well Files R & D Sohio State of Alaska ARCO Alaska, Inc. Prudhoe Bay E. ~eering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 22, 1985 Mr. C. V. "Chat" Chatterton Alaska Oiland Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-6 DS 3-7 DS 3-10 DS 3-18 DS 4-6 DS 4-8 DS 4-11 DS 4-i4 DS 4-15 DS 9-8 DS 9-10 DS 9-12 DS 9-14 DS 9-15 DS 9-16 Permit # 76-60 DS 9-18 Permit # 76-53 DS 9-17 Permit # 79-21 DS 9-19 Permit # 79-103 DS 9-20 Permit # 76- ~-~3DS 11-2 Permit #~ DS 16-1 Permit # 78-6 DS 16-2 Permit # 78-36 DS 16-3 Permit # 77-39 Permit # 77-38 Permit # 77-40 Permit # 77-41 Permit # 81-128 Permit # 80-136 Permit # 80-150 Permit # 76-83 Permit # 78-37 Permit # 76-70 Permit # 76-82 Permit # 77-7 Permit # 77-25 Permit # 77-36 Permit # 77-37 DS 16-5 Permit # 81-37 DS 16-10 Permit # 80-04 DS 16-11 Permit # 80-118 DS 16-16 Permit # 80-127 DS 17-6 Permit # 80-132 DS 17-8 Permit # 81-74 DS 17-10 Permit # 81-97 Dear }ir. Chatterton: Attached are Subsequent Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve Attachments JAN 5 1 85 cc: Sohio Alaska Petroleum Company Alaska Oil & (~as Cons. Commlsslort Anchorage ARCO Alaska, Inc, Is a Subsidiary o! AtlanflcRIchfleldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WE LLX:X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (surface) 625' & 44'5W of NW cr Sec 34, TllN, R15E, [~4 (Producing Interval) 1130'S & 1542'E of NW cr Sec 3, T10N, R15E, UM (Total Depth) 1494'S & 1236'E of NW cr Sec 3, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 52' P3fB 6. Lease Designation and Serial No. ADL 28325 OTHER [] 7. Permit No. 8. APl Number 50- 0~39~r3~-D'~7~-~?~ I/) 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 4-6 (22-3-10-15) 11. Field and Pool Prudho~. Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska Inc. has converted. DS 4-6 to water injection service. The well is part of the Flow Station 2 waterflood project. The well began receiving water on November 20, 1984. Alaska 0it & Gas Cons, 14.1 here. b~ertify tha~,~/~re~g~ is true and correct to the best of my knowledge. Signed ~_./~4~F~'"_. _ ,,,- ~ ~ Title Regional Engineer The space below for Commission use Date Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate .... ~ :":' ,;.'. '.Y F' "[ R .A ?'-.!.::J: ., :',I:'-:.':::i ('::, Alaska Oil L; Gas Cons. Commission ):) ]: S "[' j:i: :i: 'c.: ~ :': .... ,."', F:'i ARCO Alaska, Ir Prudhoe b,., Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 253 4248 Donald F. Scheve Regional Operations Engineer November 20, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 4-6 (22-3-10-15) Permit No. 76-83 DS 4-8 Permit No. 76-10 DS 4-10 Permit No. 76-42 DS 4-11 Permit No. 78-6 DS 4-14 Permit No. 78-36 DS 4-15 Permit No. 78-37 Dear Mr. Chatterton: Enclosed are the Sundry Notices and Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/mjb Enclosures cc: SOHIO Alaska Petroleum Co. File P1 (DS 4-6) W4-3 File P1 (DS 4-8) W4-3 File P1 (DS 4-10) W4-3 File P1 (DS 4-11) W4-3 File P1 (DS 4-14) W4-3 File P1 (DS 4-15) W4-3 ARCO Alaska, Inc. Is a Subaldtary of AtlantlcRIchfleldCompany ' ~-~ STATE Of ALASKA -~~ " ALASi'. ,,L AND GAS CONSERVATION ,, ,MISSION U~.~. W =LL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well 1. Status of Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] Water Injector 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-83 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20111 4. Location of well at surface 9. Unit or Lease Name 625'S & 445'W of NW cr Sec 34, TllN, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1130'S & 1542'E of NW cr Sec 3, TiON, R15E, UM DS 4-6 (22-3-10-15) At Total Depth 11. Field and Pool 1494'S & 1236'E of NW cr Sec 3, TiON, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 64' RKB ADL 28328 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 11/29/76 12/26/76 1/5/77 (per'd 5/12/77)1 feet MSL} Single 17. TotaIDepth(MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set [ 21. Thickness of Permafrost 12315'MD 9127'TVD 12222' MD 9054'TVD YES [] NO [] 2125 feetMD 1900' (approx.) 22. Type Electric or Other Logs Run DIL/BHC S/FDC CNL./GR/CAL CNL/CCL/GR ~ FDL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94~ H-40 Surf. 118' 39" 46~ 13-3/8" 72~ N-80 Surf. 2191' 17~" 1st sta~e 700 9-5/8" 47~# MN-80 Surf, 11067' 12~" 800 .~x Cl~.q.q G ~.m~ ~hr,_, DV @ 486 7" 29~ L80 10728' 12305' 8~" 364 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 11652-11672 12117-12127 *11788-11857 ' MD 5~ ~ fl. ~?~ ~ ~ /,e~ ... 11678-11698 12133-12142 *11877-11954' MD 11716-11770 12148-12183 *Perfs added on 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11964-11972 10-21-84 w/2 SPF DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11986-11993 w/4 shots per ft. N/A 12000-12007 8621-9025' TVD 12039-12082 12095-12111 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) June 1977 Future In~ector Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO N/A TEST PERIOD [~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (co~r) Press. 24-HOUR RATE I~ 28. CUR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. " 301 GEOLOGIC MARKERS' FORMATION TEsTs NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sag River 11,471 8489 Top Sadlerochit 11,581 8568 Base Sadlerochit 12,212 9047 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~~'/~ ~~~ Title Regional Engineer Date /E/~' ~:~/O~:~-/~ __ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION UOMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) 625'S & 445'W of N]~ cr Sec 34, TllN, R15E,[1H (Producing Interval) 1130'S & 1542'E of ~W cr Sec 3, T10N, R15E,[B~. (Total DePth) 1494'S & 1236'E of ~ cr Sec 3, T10N, R15E,[~ 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 64' RKB ADL 28328 7. Permit No. 76-83 8. APl Number 50- 029-20111 9. Unit or Lease Name Prudhoe Bay Unit. 10. Well Number p.s. 4-6 (22-3-10-15) 1 1. Field and Pool Prudhoe Bay Fie]_d Pnldhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 10-20-84; ~3, pressure tested equipment. RIB with gun ~1 shot interval 11934' - 11954' MD (2 SPF), shut-in well, POOH, all shots fired. RIH with~zn #2, shot interval 11917' - 11934' MD (2 SPF). Shut-in well, POOH, all shots fired. RIH wit_h gun ~3, attempted to shoot interval 11897' - 1].917' MD, gun did not fire (gased up - cut O-ring). Shut-in well, POOR. RIR with.qun ~3A, shot integral 11897' - 11917' MD (2 SPF), shut-in well, POOR, all all shots fired. RIH withgun #4, shot interval 11877' - 11897' MD (2 SPF), shut-in well, POOR all shots fired. RIH with gun #5, shot inte~al 11838' - 11857' MD (2 SPF). Shut-in well, POOH, all shots fired. Secured well. 10-21-84: Pressure tested equ_ipment. RIH with gun #6, shot interval 11~18' - 11838' MD (2 SPF). Shut-inwell, POOH, all shots fired. RI~ with .qBm 97. Shot interval 11798' - 11818' MD (2 SPF). Shut-in well, POOH, all shots fired. RIH with ~n~ #8, shot interval 11788' - 11798' MD (2 SPF). Shut-inwell, atte~pted to POOR, crowned out in the lubricator, tool string was knocked_ off, fish was left in the hole. REF: BHCS 12/25/76 14. I hereby_~ify tlat ~eFeg~g ~e a~d~correct to the best of my knowledge. Signed¢~/~~, .. ~. ~/'~~ Title Reg. ional Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev, 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, IN Prudhoe Ba~ engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 18, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 4-6 DS 4-8 DS 4-10 DS 4-11 DS 4-14 DS 4-15 Permit No. 76-83 Permit No. 76-10 Permit No. 76-42 Permit No. 78-6 Permit No. 78-36 Permit No. 78-37 Enclosed are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/la Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 4-6)W1-3 File PI(DS 4-8)W1-3 File Pi(DS 4-10)Wl-3 File Pi(DS 4-11)W1-3 File PI(DS 4-14)Wl-3 File PI(DS 4-15)W1-3 ARC© Ala!~ka. Ir~( ,r~ e Subsidiary o! Alhr'mtlcRIchfieldCompan¥ ~ STATE OF ALASKA ALASi -)IL AND GAS CONSERVATION MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-83 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20111 4. Location of Well (Surface) 625'S & 445'W of NW cr Sec 34, TllN, R15E,UM (Producing Interval) 1130'S & 1542'E of NW cr Sec 3, T10N, R15E,UM (Total Depth) 1494'S & 1236'E of NW cr Sec ~, T10N: R15E..UM 5. Elevation in feet (indicate KB, DF, etc.)I 6. Lease Designation and Serial No. __ 64' RKB ADL 2R32R 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 4-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate XI-] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe'Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 4-6 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and cleanup operation. Proposed Perforation Intervals: 11788-11857' MD w/2 spf 11877-11954' MD Reference Log: BHCS 6/15/76 14. I hereby c,t~tify that the foregoing is true and correct to the best of my knowledge. Signed .~.~'~.~~~ Title lqegional F,D_gineer The space below for Commission use Date Conditions of Approval, if any: Approved by Form 10-403 Approved fop;' Returned ~.. 8,/Order of COMMISSION[R the Commission _/,o ,,? Date Submit "Intentions" in Triplicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCO Alaska, In~ Prudhoe B~,~ Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 90.7 263 4248 Donald F. Scheve Regional Operations Engineer September 17, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Poz'cupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 4-6 (22-3-10-15) Permit No. 76-83 DS 4-11 Permit No. 78-6 DS 4-14 Permit No. 78-36 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/DWR/mjb Enclosures cc: SOHIO Alaska Petroleum Co. File P1 (DS 4-6) W4-3 File P1 (DS 4-11) W4-3 File P1 (DS 4-14) W4-3 Alaska Oil & 6:-,,,, Cun:~. f;~,i,~mlsslolt ~ f*- .... , STATE OF ALASKA - ALASl )IL AND GAS CONSERVATION _,¢IMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well OIL[i] GAS [] SUSPENDED [] ABANDONED [] SERVICE Classification of Service Well Water Injector 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 625'S & 445'W of NW cr Sec 34, TllN, R15E, UM At Top Producing Interval 1130'S & 1542'E of NW cr Sec 3, TION, R15E, UM At Total Depth 1494'S & 1236'E of NW cr Sec 3~ T10N~ R15E~ UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 64' RKB I ADL 28328 7. Permit Number 76-83 8. APl Number 50- 029-20111 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 4-6 (22-3-10-15) 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Date Spudded 11/29/76 17. Total Depth (MD+TVD) 12315 ' MD 9127 ' TVD 13. Date T.D. Reached 12/26/76 18.Plug Back Depth (MD+TVD) 12222' MI) 9054'TVD 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 1/5/77 (per'd 5/12/77)I feet MSL Single 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost YES~ NO [] 2125 feet MD I 1900' (approx,) 22. Type Electric or Other Logs Run 23. DIL/BHCS/FDC CNL/OR/CAL CASING SIZE WT. PER FT. 94# 72~ ~7~ GRADE H-AD N-go MN-gO L80 CNL/CCL/6R, FDL CASING, LINER AND CEMENTING RECORD 20" 13-3/8" 9-5/8" 7" SETTING DEPTH MD TOP I BOTTOM RllrF_ 1 ] R ' Surf. I ~1 91 ' Surf. I 11067 ' 10728' I 12305' I HOLE SIZE CEMENTING RECORD AMOUNT PULLED 466 sx ~ondu Cmt I~P ~g~ 700 ~ PFIT 24. Perforations open to Production (MD+TVD of Top and Bottom and 27. 36& sx Class G thru DV @ 486 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) interval, sizeand number *11652-11672 *11678-11698 *11716-11770 11964-11972 11986-11993 12000-12007 12039-12082 12095-12111 12117-12127 12133-12142 12148-12183 w/4 shots per ft. 8621-9025' TVD *per£s added 8/12/84 w/4 SPF 5~ 10,625 10,493 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A PRODUCTION TEST Date First ProductiOn June 1977 Date of Test Flow Tubing Press. Hours Tested Casing Pressure I Method of Operation (Flowing, gas lift, etc.) I Future Injector PRODUCTION FOR OIL-EEL t GAS-MCF TEST PERIOD I CALCULATED I~ O'IL-BBL GAS-MCF 24-HOUR RATE 28. CORE DATA I WATER-EEL CHOKE SIZE IGAS-OIL RATIO I WATER-EEL OIL GRAVITY-APl (corr) Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/A RECEIVED SEP 1 8 Alaska Oil & Gas Cons. c0mmiss Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME Top Sag River Top Sadlerochit Base Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 11,471 11~581 TRUE VERT. DEPTH 8489 8568 9047 30. 12,212 FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed__~tf~~~L~/~_.-. -~ ---- Title Regional EpgJneer . Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none" Form 10-407 ARCO~Aiaska, I[' ~ Prudhoe 'bay Engineering Post Office Box 360 Anchorage, Alaska 995.10 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer September 17, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: ~D~ DS 4-11 DS 4-14 Permit No. 76-83 Permit No. 78-6 Permit No. 78-36 Attached are "Completion" Sundry Notices for "Subsequent Reports" on the above-mentioned well. Very truly yours, D. F. Scheve DFS/DWR/mjb Attachments CC: Sohio Petroleum File Pi(DS 4-6)W1-3 File Pi(DS 4-11)W1-3 File PI(DS 4-14)W1-3 RECEIVED SEP 1. $ Alaska Oil & Gas Cons. commission Anchorage ARCO Alaska, Inc. I~ a Subsidiary of AtlantlcRIchfleldComDsn¥ ~--. STATE OF ALASKA ~-. ALAS, OIL AND GAS CONSERVATION ~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL[] OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-83 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell (Surface) 625'S & 445'W of NW cr Sec 34, TllN, R15E, DM (Producing Interval) 1130'S & 1542'E of NW cr Sec 3, T10N, R15E, UM (Total Depth) 1494'S & 1236'E of NW cr Sec 3, T10N,.R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 64' RKB I ADL 28328 12. 8. APl Number 50-- 029-20111 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 4-6 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, fOr Abandonment see 20 AAC 25.105-170). Began perforating operation 8/12/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 11750' - 11770' MD (4spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval 11730' - 11750' MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun ~3, shot interval 11716' - 11730' MD (4 spf), flowed well to clean up. Shut-in well, POOH, all shots fired. RIH with gun #4, shot interval 11678' - 11698' MD (4 spf), flowed well to clean up. RIH with gun #5, shot interval 11652' - 11672' MD (4 spf), flowed well to clean up. Shut in well, POOH, all shots fired. Ran SSSV, secured well, RD. Ref: BHCS 12/25/76 RECEIVED SEP 1 Alaska 0ii & Gas Cons. Commission ~-nch0raga 14. i hereby,p]ertify that the foregoing is true and correct to the best of my knowledge. Signed .~2~~~~,, Title R~g~©r~a] ~Dr3irteer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc, Prudhoe Ba~ ~;ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer August 9, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 4-6 (22-3-10-15) - Permit No. 76-83 DS 4-11 - Permit No. 78-6 DS 4-14 - Permit No. 78-36 DS 4-15 - Permit No. 78-37 Enclosed are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. D. F. Scheve DFS/WT/mjb Attachments cc: SOHIO Alaska Petroleum Co. File PI(DS 4-6)W1-3 File Pi(DS 4-11)W1-3 File Pi(DS 4-14)W1-3 File Pi(DS 4-15)W1-3 ARCO Alaska, inc. is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKJ IL AND GAS CONSERVATIONC .4MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 76-83 3. Address 8. APl Number P.O. BO× 100360, Anchorage, Alaska 99510 5o- 029-20111 4. Location of Well (Surface) 625'S & 445'W of NW cr Sec 34, TllN, R15E,UM (Producing Interval) 1130'S & 1542'E of NW cr Sec 3, T10N, R15E,UM (Total Depth) 1494'S & 1236'E of NW cr Sec 3, T10N, R15E,UM 5. Elevation in feet (indicate KB, DF, etc.) 64' RKB 6. Lease Designation and Serial No. ADL 28328 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number P.S. 4-6 (22-3-10-15) 1 1. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate I~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Welt . [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly sta{e all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). · ARCO Alaska, Inc. proposes to add perforations to DS 4-6 with intent to convert to a water injection well. Perforations will be added to selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 11652 - 11672' MD (20') 11678 - 11698' MD (20') 11716 - 11770' MD (54') REF: BHCS 12/25/76 RECEIVED ^UG 0 9 ][t84 Alaska Oil & Gas Cons. Commission Anchorage 14. i hereby. F'er/[ify that th~e,-;foreJ~l~mg is and correct to the best of my knowledge. Signed ~///~~./~, ~ ~..~-~e.~Tit,e Regional Engineer The space below for Commission use Date Conditions of APproval, if any: BT [§H~IE C. SMITH Approved by COMMISSIONER · ~pproved Copy "~Returned(~C~~/ By Order of the Commission Form 10-403 Rev. 7-1 ~80 Submit "lnte0tions" in Triplicate and "Subsequent Reports" in Duplicate Anchorage. A~Ska 99510 · Telephone 90 77 5637 January 3, 1983 RE' ARCO Pressure Surveys D.S, 16-14 12-16-82 Static Survey Camco D.S. 9-6 11-28-82 Pressure Build-up Survey Camco D.S. 9-1 11-17-82 pressure Build-up Survey Gearhart D.S. 11-7 12-05-82 Pressure Build-up Survey Camco D.S. 17-9 .,11-19-82~ Static Survey Camco ,D.S. 4-6 11-19-82 Pressure Build-up Survey Gearhart / Please sign~and return the attached copy as receipt of data. Becky Benedict AFA-403 Trans. //008 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON. EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS ARCO Alaa. kJ I~C ARCO Alaska, Inc. Post Office Anchorage, A ,3 99510 Telephone 907 277 5637 January 21, 1982 Reference: ARCO PRESSURE DATA D:S. 9-3 11/~0/81 Pressure Surve'y D.S.3-4 11/20/81 " " D.S.17-6 11/15/81 " " D.S.3-2 11/19/81 " " D.S.17-1 11/15/81 " " D.S.9-1 11/21/81 " " D.S. 16-16 11/15/81 · D.S.16-1 11/14/81 " " D.S.4-7 12/2/81 " " 'D.S.9-8 11/15/81 " " D.S.16-11 11/14/81 " " D.S.9-5 11/22/81 " " D.S.9-15 11/24/81 " " D.S.4-6 11/25/81 " " D.S.9-6 11/16/81 " " D.S.3-18 11/19/81 " " D.S.9-4 11/21/81 " " D.S.9-12 11/20/81 " " D.S.9-10 11/20/81 " " D.$.3-6 11/18/81 " " D.S.3-7 11/18/81 " " DISTRIBUTION /,~~Se sign and return the attachedNORTH GEOLOGY copy as receipt of data. Mary F. Kellis North Engineering R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON Transmittal #902 D.S.9-6' 12/9/81 D,S.9-6 1/1/81 D.S.9-17 12/10/81 D.S.9-6 12/23/81 . . DOS.12-9 1/4/82 D.S.12-10 1/3/82 D.S.12-12 1/2/82 D.S.12-11 1/2/82 D.S.16-9 1/8/82 Pressure Survey II II I! 11 II II I1 II !1 I! I! II II II MOBIL GETTY D&M GEOLOGY STATE ARCO Ala~,ka. inc, is a Su~-'~d,ar¥ of AH,~mt~CRlchlie~dCo,~pany ARCO Oil and Gas Co~mpany .~. North Alaska ',trict Post Office E~.. 360 AnChorage, Alaska 39510 Telephone 907 277 5837 Jerry A. Rochon District Operations Engineer December 8, 1981 Refer.ence: ARCO P~ssure Data D.S.14-3 10/24/81 D.S.4-6 10-21/22-81 D.S.4-5 9-12/13-81 Pressure Survey Pressure Survey Pressure Survey se sign and return the attached copy as receipt of data. Mary F. Keilis North Engineering Transmittal #800 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ,ALASKA MOBIL Als. sk:a 0il & Gas Cons. Commi~iort GETTY Anchorage PHILLIPS SOHIO MARATHON CHEVRON ARCO Od and r- .~, Company ~s a Di.qslon of Atla~ltlcR,chlieldComp.~ny AHL;O Oil and Gas Company North A la s,~--,~.r) ist ric t Post Offio )x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer January 28, 1981 Reference: ARCO Pressure Data D.S.4-1 12-08/09-80 ' ....D.S.4-6 :7' 12-06/07-80 Pressure Survey Pressure Survey ,3 "' -:' :?': ",T c 'T ..,l,,,, TFC . [ p~ lF~p.' 'FIt. F: ease sign and return the attached copy as receipt of data. Mary Kellis North Engineering Transmittal #19 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Oil and Gas Company is a Division ol AtlanticRichlieldCompany ARCO Oil and Ga>.~ompany Norlh Alas District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 25, 1980 Reference: ARCO Magnetic Tapes D.So 9-7 10/2/80 Tape #61054 Run 2 ]~' ,,-' 2 !' 3' F. HG i ,tGEOL ", i S~'AT TEC' I ,STATT,:CC .... CONFER; '------ F1LF: ,? D.S. 9-4 .10/2/80 Tape #61051 Run 4 ...... 1~.S. 4-6 1)3/1/80 Tape #61046 Run 5 ~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #846 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO OH and Gas Company is a Division ol AllantlcR~chfieldCompany ARCO Oil and Gas Company North A ,a District Post Offi~,e Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer November 21, 1980 Reference: ARCO Pressure Data D.S. 4-1 5/8/80 Pressure Survey D.S. 4-7 5/12/80 " " ...... · D.S. 4-5 5/15/80 " " D.S. 4-5 9-7/8,80 " " STAT ]'cr-.. STAT '[-C ~Please sign and return the attached copy as receipt of data. Mary Kellis North Engineering Transmittal #837 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA . CHEVRON NOV 2 5 1980 ^laska 0il & Gas Cons. Commission Anchorage ARCO Oil and Gas Company is a Division of AtlanlicRichfieldCompany ARCO Oil and Gas~,,.ompany Norlh Alas,~ .~istrict Post Office .~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer October 21, 1980 Reference: ARCO Cased Hole Finals D.S. 1-10 12/9/79 D.S. 4-7 10/1/80 CNL D.S. 6-3 10/5/80 CNL lO/2/8o 10/3/80 DSTNDT D.S. 9-7 CNL D.S. 9-16 CNL P~lease sign and return the attached copy as receipt of data. Run 3 2" & 5" (same log) Run 5 5" Run 4 5" Run 3 5" Run 2 5" Run 2 5" Mary Kellis North Engineering TRANSMITTAL #737 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Oil ,',nd Gas Company is a Division of All,.lnhcRichl~eldComl:),~ny Re£erence' MtCO ~'~, ~,~gn~ cic Tapos 1/27/77 Tape !!60221 .,, 11/12/78 x'~,,>~, ~ 1/25/80 l'ape D.S. 9-19 1/27/80 I'ape /~60247 /~icase sign. and return the attached copy as o{ data. X. J. Sahlstrom North Pingineering DISTRiSLFFION North Geology Ran En~. Hanaser Ceolog)' State o{ >~aska P'.XXO II Ntobii Getty Phillips Sohio }.Iarathon De~ember 15, 1979 Lnctosed are Pressure 'Surveys for 'the following ARCO wells · D.S. 1-10 8/7-8/79 Camco D.~?~~ 11/2-5/79 · ~S. 4- 11/19/79 Gearhart-O, ven ~ 8/27-28/79 Camco D.S, 7-2 * 11/4/79 Gearhart-C~ven D.S. 7-14 11/10/79 " " D,S. 9-5 10/27-28/79 Ca. nco D.S, 9-12 10/24-25/79 Camco lease sign and retun~ the attached copy as recb:ipt of data. K. J. Sahlstrom North ~ ' ': TK&N~IIT[RL ~t 519 Nort.]x Ceo] ogy P, & N-illing D & Ceo ] State of A'las]<a }]X. XOII ~lob ~ 1 getty t)i~i.l l_J ps Sc)]',, io :-I,1I ~lc,lO:l Anchora{: ~laska 995~0 Septem?oer 27, 1979 Reference' Enclosed are Cased Hole Logs for the £ollowing N¢CO wells' D.S. 1-6 7/11/79 ONL Run 1 5" D.S 4-15 7/51/79 " Run I 5" D,S~,.~ 9/6/79 " Run 2 5" ~~ ................... ~ 5/21/79 Spinner Run 1 5" lasesign and retm~ 'the a~tached as receipt copy of data. K. J. Sahlstrom North Engineering. T~N~,'IITTAL # 377 ]) [STRIi;[~T North Arnerica..'~ Pro~!ucinrj Division Post Office ._ x 380 /'[~ Anchora,se, Alaska 93510 ie!~phone 907 277 5337 ~closed are copies of the following Pressure Buzldup~ ~ ~D.S. '4-7 3-19-79 Please sign and return the attached j~o.p,.ies of the transmittal as reCeipt of data.~/cr~.~-' Very truly yours, R. A. Hamlin North Operations Engineering Transmittal #154 DISTRIBUTION North Geology Ih'tiling Eng. Manager R & D GeolOgy State of Alaska D & M tlxxo~t Mobil Getty Sohio Marathon Phillips Chevron January 22, 1979 Reference' Enclsoed are the foil. owing cased hole logs: DS 5-14 Cont. Flow 6/14/78 DS 9-17 Cont. Flow 6/28/78 DS 6-8 Borehole Audio 10/31/78 DS 6-7 CNL 8/25/78 DS 3-7 Spinner 10/19/78 DS 9-9 Fluid Density 10/29/78 DS 6-2 CCL w/dummy gun 10/29/78 DS 1-4 OR/N 11/11/78 DS 6-4 CCL 11/13/78 DS 4-5 CNL 11/14/78 NGI #2 CCL w/Dummy gun 10/27/78 DS 2-1 CNL 11/11/78 NGI #2 CCL w/ Dummy gun 11/22/78 DS 5-12 Cont. Flow 6/10/78 DS 5-2 CNL 11/09/78 Please sign and return the copy as receipt o'f daLac/ Sincerely, V.G. Reimers North Engineering TRANSMITTAL #033 DISTRIBUTION North Geology Drilling Eng. Nanager R&D Geology State of Alaska D & M EX]iOn Sohio Mobil Mara th on Pl~illips Ci~.evron Getty AtlanticRichfieldCompany North American Producing Division Alaska Re~'', Post Office .)x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 15, 1978 Reference: HKVP Enclosed are copies of the following Transient Pressure Buildup Surveys: ~D.S. #4~6~ 10/2-3/78 Camco ~-D.S. #427 10/4-5/78 Camco w'D.S. #4-8 10-03-78 Camco vfD.S. #4-10 10/6-7/78 Camco w~D.S. #9-3 10/12-13/78 Camco wD.s. #9-4 10/14-15/78 Camco ~'D.S. #9-8 10/18-19/78 Camco ~-'D.S. #9-10 10/16-17/78 Camco '~D.S. #9-12 10/20-21/78 Camco wD.S. #9-15 10/22-23/78 iCamco Please sign and return the attached copy of the transmittal letter as receipt of data. . . . Very truly yours, R.A. Logue North Operations Engineering Transmittal #615 DISTRIBUTION North Geology Drilling Eng. Manager Dallas Geology State of Alaska D & M R & D '-% Exxon · Sohio Mobil Marathon Phillips Chevron Getty ichlieldCon'~pany North Alas~.,.~, lrict Post Office Gox 360 Anchorage, Alaska 99510 Telephone 90'7 277 5637 December t, 1978 State of Alaska Attn: Mr. Hoyle Hamilton 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: In regards to your request for delinquent reservoir surveilance data, our records indicate the following: - Wells #3-3~3,4, 3-6, 4-1,~4-6,/4-9, 5-15, 5-16, and 9-44 per your dates, indic'~'f~'that they are Initial Static Surveys where they were shut-in for less than 12 hours and no stabiliZed flow rates are available. - Copies of surveys for D.S. #9-6 and #1-6 have been sent on ll-28-78~_.and should reach your attention shortly. D.S~"'#5-8.,~as sent out earlier this year and a copy will be~§~t with this letter for your information. If further information is needed, please do not hesitate to request it from us. Very truly yours, / ./ ,~ ~. J.. A. Rochon District Engineer ral:JR ' HKVP / : /! AtlanticR~chfieldCompany North Amer!~n Producing Division North Alasi :istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. H°yle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 4-1 Permit No. 70-42 DS 4-2 Permit No. 70-63 DS 4-3 Permit No. 71- 5 DS 4-4 Permit No. 71-11 /~j~?~....~%_~Permit No. 71-25 ~~Permit No 76-83 DS 4-7 Permit'No 75-77 DS 4-8 Permit No. 76-10 DS 4-9 Permit No. 76-30 DS 4-10 Permit No. 76-42 Dear Sir: Enclosed please find a Completion Reportf:for the above- mentioned wells. Very truly yours, Frank M. Brown DiStrict Drilling Engineer FMB:ir Attachments STATE OF ALASKA SUBMIT IN OIL AND GAS CONSERVATION COMMITTEE i _ i WELl COMPLETION OR RECOMPLETION REPORT AND LOG* II II IIII ii ~. T¥~ OF WELL: I WELL'~_.~' WELL ~_~ DRYL__J Other b. TYPE OF COMPLETION: ,,'m.L (,VF.U ns n.~CK nEsvn. OtherP f r e H ___ er ._.o.~a_e~ · .~ lATE* ( Se, ntlmr In. st ructions on r eve v.~'e si,h,? 2. NAME OF OPERATOR Atlant ic Richfield. Cqmpany ADDRESS 01' OPERATOR P. 0. Box 360, Anchorage, ,Alaska ~510 4. LOCATION OF WELL (Re~ort tocation c~early and in accordance with any State requirements)* 5. API NU1VLI~lllCAL CODE 50-029-20111 6. LEASE DE~IGNA'FiON AND SEtl. iLAL biO. APL 28328 7. 1F 1ND1Ad'4, A,I~LO'F'FEE (-)1~ TRIBE NANiE 8. UNIT,F~KlliM O1( LEASE NAME Prudhoe Bay Unit 9. WE, LL NO. DS 4-6 (22-3-10-15) 10.Ffftt~h~ r~g~ cl~t~lC Prudhoe Oil Pool 11. SEC., T., I~., M., (BOTTOM HO~ O~ ECq'iVE) At surface 625'S & 445'W of NW cr Sec 34, TllN, R15E, UM At top prod. interval reported below A~I~Q~ 1542'E of NW cr Sec 3, T10N, R15E, UM 1494'S & 1236'E of NW cr Sec 3, T10N, R15E, UM Sec 3, T10N, R15E, UM 12. PErt~IIT NO. 76-83 11/29/76 12/26/76 !1/5/77 (perf'd 5/12/7 ) 64'RKB 31'Pad Elev.(G~avel) 12315'MD, 9127'TV 12222'MD, 9054'TV ~ng±e 22. PRODUCING !>YTqERVAL(S), OF THIS CO~iViPI.~TIO~Nr--TO~P, BOTWO1V[, NAME (MD AND TVI))* 2:l. ~VAS D[RECTIONAL ! SUI~¥'~:¥ MADE Top Sadlerochit ll,581'MD 8568'TVD Base Sadlerochit 12,212'MD 9047'TVD I Yes 24, TYPE ELECTRIC AND OTHER LOGS RUN DIL/BHCS/FDC CNL/GR/Cal 25. CA, SIZ'~ C; SIZE 20" 13-3/8" CNL/CCL/OR, FDL CASING RECORD (Report all strings set in we'll) ' 94# IH-40 [ 118' 39" 466 CF Fondu.Cmt 72# !N-80 [ 2191' 17-1/2"11st stage 700 sx PFII,2nd stg 400sx PF 9-5/8" 47# Butt /MN-80~ 11067' 12-1,/4",[800 sx Class G cmt, thru DV Q 486 llll I III II Ill $!Z~ TOP (A'ID) } EOTTOA'I (A,~D) l SACKS C~MEN~T* SC~iE~ (AfD) SIZE 7" 10,728' ,, 1 ,J05' 3648x 'Cla~s g 5%" 10,493' -- Illin . I l 28. PERFORATIONS OP~ TO PRODUC~ON (interval, size and nurnber) 29. ACID, Si:CT, Fi;AZ7[ GEE, C~,[ENq' SQU!_'A;;Z>L ETC. 11,964 ' - 11,972 ' 12,095 ' - 12,111' ~m'n ~r~'~v.~ ,, Ih ~ '~ ,; ,, · ~ ~ .,' ~; 11,986~ - 11,993~ 12,117~ - 12,127~ NA 12,000* - 12,007~ 12,133~ - 12,142~ 12,039' 12,082' 12,148' - 12,183' :~¢ ...... ~'~ w/4 s, ho¢s per ft. ... DAT~ FIRST t3fiODU~TION PIIODUCT1ON 55El[iOD (Flowiiog, F:a3 lif[, pumping--size and type of pump, or '~ June 1977 ) } Flowing ~ I Producing ~TE~~T~/ ~' [~OURS TESTD [C}tOXE SiZE [PROD'N FOR OI~BBL. G.IS--*2iCF. ~VA'fEII--BB~. [GAS-OI[~ It.'J['IO I 1 O /TEST , 9/7/77 [ 4.1 121 4S/64[ ~' [ 7~5.6 [ 361.3 ] 0 [ 505 1 .... ~6~, TUBiN6l* ]C~hNG PEESSUEB ICALC~T~ OI~BBL. GAS--MCP, WA~--BBL. lOlL GRXVI~Y-~I (CORa.) m~ss. I p¢-~ou~. ~ I 1 ~ 1281 I 0 I - ~ [ 4189 I 2115 I 0 27.0 ,A. vzsPosmuoN o~ s~s (Said, ueed 7or ]ueZ, vented, etc.) ' I TEST W ITNESSgD BY ......Reiniec~ed 32. LIST O~ ATTACHMENT8 .33. I lm ' _reby certify that the f__ore~nd attached information is complete and correct as determined from all-available rec,rds __ ~ *(See Instructions and Spaces Jar Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- Tents given in cther spaces on this form and in any att,~chmer~ts Items 20, and 22:: If this well is completed for separate, production from more than one interval zone (multiple completion), so state in item 20, and in iteq~ 22 show the p~c. Jucin9 interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additior~al interval to ~e seperately produced, show- ing the ack:litional data pertinent to such interval. Itern26: "Sacks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 35. G ]~OI-,C)G I C M A R K Ir'~R~ WATT~I~ AND MUD NAMI~ ~,~:^s. D~'m ~U~ V~.v. ~'~ Top Sag River 11,471' 8489' Top Sadlerochit 11,581' 8568' Base Sadlerochit 12,212 ' 9047 ' CORE DATA. Aqn'AClI fi~IEP "D~:~O~S OF LITIIOLOGY. POnOSlTY. FRA'c~R~. A~'~ ~ A~D ~EqfECq'Bi) SHOWS OF OIL, G~ OR WA~. -I .... · .. ,, ::tim'IticRichf:eldCornpany Nord~ American Producing D~vJs~on Alaska Post OIfice~ 360 Anchorage, ,~Waska 99510 Telephone 907 277 5837 .......... June 22, 1978 Reference' Enclosed are'Transient. Pressure Surveys for the following wells- *D.S. #3-7 - *D.S. #2-1 D.S. #5-8' D.S. #2-9 (Corrected revised data) Please sign attached copy as receipt of data. Very truly yours, R. A. Logue North Operations Engineering Indicates key well data Transmittal #366 76' . J. A. ]',ocbon/P,. A, ~,ogu.e are the following, for t]~e s":'~,ject we].].' Scale · . Acid or Fracture Tregtment I,og - },.IP Buildup & I;low Profile Su~.~re), ];orc.:l~ole Geometry Log, Carbon Oxygen Log .... Casing Collar Log. Cement Bond, Log Compensated Neutron L6g - Cased I lole Core ~alysis - InterVal Core No. Core 9escription ($~IC)- Interval Core Description '(Cony.) - Core Directional SunTy ~. Gyro - Single Shot. '}ingineering Production' Log Fluid Analysis Fluid Density Gamma' Ray Location Plat. MonthLy l~'ell TeSt Data Nud Log Perforating Record. State Reservoir Pressure Report Surveillance Reports T(mtperature Log Il--, "~ .... ~ 'l'ransient Pressure Surveys 1'VI) Logs - Duel Induction I, aterolog - Compensated Format:ion - Compensated Neutron- Density ],og - Bore]~o].e Compensated Somic 1,og - t'orosity. Log ~<:ase Re[t~,-i~ ],cool.pt To' Ms. R. A. At]ant'lc R.ic];fic:]_d Co:iii)any P O. Lox 360 Anchorage, Alaska 995] Xerox Sepia 'BL Linc Divisic~ of Oil and Gas Cc~u~ervaticn O. K. Gilbreth, Jr March 9, 1978 Direcen~ . ~yle H. ~lton . ~~ John C. Miller ~troleum En~r Witness Surface and Subsurface Safety Valve Tests at Arco DS 4-6, While ~n duty at Prudh~ Bay ~ ~rface (SSV) a~ ~mrf~ (SSSV) safety vales ~n Arco DS 3, I ~s requested to retest valves c~ ~11 DS 4-6 wh/~h had failed a previous test. ~Fr' .1day, Fek~%~xy .3, 1978 - After valve testing on DS 3 was completed M/ke ~'-~Y-~%o DS 4-6 at 3:30 I%~. Flowing t~essure ~s 1250 psig when the Otis surface controlled SSSV was closed. We reduced flcwline pressure to 850 psig and closed the flowline valve. Flc~line uressure built up to 1020 psig in 5 minutes indicating unacce~le SSSV leakage. reduced to 800 Dsig and shut-in. Flowlin~ pre~are inc~a~ to 830 in 5 minutes aha then r~dned unchanged. or rep~ and retested. I gave a copy of the report to Mike F~, sent a oopy to Charles Simmnds with Aroo in Anchorage, and a ccgy is attached to this report. Also a~ is the field ~ork sheet shag details of ~ test. I re~ to Arco Base Operatifm~s Cen~_r at 5:15 PM. In su~: I witnessed satisfactory ~SV test and unsati.sfactory test. o-~ at Arco DS 4-6. The opera~ %~s advised to repaar or replace the SSSV and sche~ale a witnessed t~t. A~t / Z-.:2),,). i i _ i 't t · ~' ~ ':~, ::?-:~"' ~."'. ":~ · Field Inspection Report -" [~rig?ilPe'rmit No. _ "' ~''= Well/Platfm Sec3~l/.IN R I~~, ]~_M · Operator~~~ Represented' by~ ~en~xName & Number.. D~ ~ - ~ ' Satisfactory Type Inspection Yes No .Item ( ) Location,General () () () () () () ( ) ( ) '4. R!'g~'safety Valve Tests 5. Surface-No. Wells ! ._ 6. Subsurface-No. Wells (.) Well Test Data 7 Well ~J.os._ · ,__,__, 8. Hrs. ¢~bser , , () (W 1.. Well Sign 2. General Housekeeping 3. Reserve Pit-( )open( )filled () () () () ( ) ( ) '9.. BS&W ,--, ,-- ( ) ( ) 10'. Gr. B61s. " ( ) Final Abandon~nent ( ) ( )- l l. P&A Marker '() () () () Satisfactory Type Inspection Yes No Item ( ) BOPE Tests ( ) ( ) 15. "Casing set @ ( ) ( ) 16. Test fluid-( )wtr.--~ )mud ()oil ( ) ( ) 17. Master Hyd. Control Sys.- psig ( ) ( ) 18. N2 btls. ,__,__, psig ( ) ( ) 19. Remote Controls ( ) ( ) 20. Drilling spool- "outlets ( ) ( ) 21. Kill Line-( )Check valve ( ) ( ) 22. Choke Flowline ( ) HCR valve ( ) ( ) 23. Choke Manifold No. valvs fl.Qs '( ) ( ) 24. Chokes-( )Remote( )Pos:(-~dj. ( ) ( ) 25..Test Plug-( )Wellhd( )csg( )none' ( ) ( ) 26. Annular Preventer,psi.~ ( ) ( ) 27. Blind Rams, psio ( ) ( ) 28· Pipe Rams . .psiq 29. Kelly & Kelly-cock ___psig 30. Lower Kelly valve psi? 12. Water well ( )capped( )plugged ( ) ( ) 13 Clean-up ( ) ( ) ( ) ( ) 14~ Pad leveled ( ) ( ) 31. Safety Floor valve~'(-)BV ( )Dart Total inspection observation time_~_hrs/Jag~ Total number leaks and/or equip· failures / Remarks --~ ~ ~/ cc Ch~,~/e~ ~~Notify in days or when ready Inspected by" ' C DEPAR~4~ OF NA~31RqAL ~CES Division of Oil and f~s Cc~~~on O.' K. ~re~, Jr F~~ 9, 1978 D~ Hoy~ H. ~1~ ~~' ~ef ~~le~ ~g~r~"' Test Surface Safety Valves .(SS~7), Subsurface Safe~f Valves (SSSV), LG~ Pressure Pilots and Ann~lar Pressures ~n ARCO's Drill Sites ~1, ~ Subject test involved two separate trips to Prudhoe Bay, ~e first on Jan~mry 16, 1978, and the seccr~ on January 22, 1978, with eight cumula- tive days spent testing. Part of the secQnd trip v~s utilized retest- ing certain wells on drill site 91 after guide lines %~_re agreed upon at a meeting be~.~=en agency and ARCO production personnel on January 20~:~. Listed bel~ are ~J~e results of the tests: L.P.Pilot Initial SSV SSV SSSV SSSV Actuated. Flowing Tested Test' Tested Test l.~___~_~ @ PSI Pressure @ PSI Results @ PS_~I t~sults 1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 4-1 4-2 4-3 4-4 4-7 4-8 4-9 ~-1.0 720 1550 700 1270 700 790 660 1020 700 900 700 ~1550 700 1140 700 1140 700 1600 780 1400 2075 680 1300 775 1450 670 1560 700 1300 700 1500 700 1350 650 960 650 1450 9 5/8" ~nulas PSI 640 OK 825 C~ 25 675 OK 720 (~ 0 620 C~i 660 Failed 0 680 OK 700 OK 0 740 OK 700 QK 90 800 OK 810 OK 0 695 OK 650 Failed 60 740 OK 750 Failed 0 970 Failed 1000 F~%iled 0 * ** Inq0e_rable 700 OK 700 OK 0 * *** Failed 0 750 OK 750 OK 0 750 OK 750 OK 0 700 OK 890 OK 0 * *** Failed 100 775 QK 700 OK 0 700 C~ 760 Failed 0 660 OK 650 OK 100 700 fR~ *** Failed 50 * Not tested ** SSSV inoperable. Being~iPulled. *** SSSSV ~ould not close. 13 3/8" k~mulas PSI 0 0 0 ~0 100 0 5O 0 0 100 0 250 0 0 0 0 0 0 0 . .Al Oil and Gas Conservation Drlg. Permit N~ Field InsPec_tjon Report ~~ Wel 1/fZl~m Sec T R , Operator__ ./2'm~,_~ Represented by~,~,__~~._ Name & Number~~ Satisfactory Type Inspection Satisfactory Type Inspection Yes No Item ( ) LoCation,General Yes No Item ( ) BOPE Tests ( ) ( ) 1. Well Sign ( ) ( ) .15. "Casing set ~ ( ) ( ) 2. General Housekeeping ( ) ( ) 16. TesL fluid-( )wtr.---I )mud ( ) oil ( ) ( ) ~. Reserve Pit-( )open( )filled~ ( ) ( ) 17. blaster Hyd. Control Sys.- pSiQ ( ) ( ) 4. Rig ( ) () 18. ~'!2 btls.~,_~,~, psig (~)~'Safety Valve Tests ( ) ( ) 19. Remote Controls ( ) ( ) 5. Surface-No. Wells~ ( ) ( ) 20. Drilling spool- "outlets ( ) (~,~/'"6. Subsurface-No. Wells_ ~ ( ) ( ) 21. Kill Line-( ) Check valve ( ) Well Test Data ( ) ( ) 22. Choke Flowline ( ) HCR valve ( ) ( ) 7. Well Nos. I, ,__,__ ( ) ( ) 23. Choke Manifold No. valvs flos ( ) ( ) 8. Hrs.. obser , , , ( ) ( ) 24. Chokes-~.( )Remote( )Po_s.(-~djl ( ) ( ) 9. BS&'W ,I, , I ( ) ( ) 25 Test Pl~Uo-( )Wellhd( ~csg( )none ( ) ( ) 10. Gr. Bbls[- ' , ----~'----7, ( ) ( ) 26. Annula~"~reventer, psig ( ) Final Abandonment -- ( ) ( ) 27.. Blind Rams, psio ' ( ) ( ) l l. P&A Marker ( ) ( ) 28. Pipe Rams ~.psiq ( ) ( ) 1Z. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock ~psio ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly val.ve psis" ( ) ( ) 14'. Pad leveled ( ) ( ) 31 Safety Floor valves-Z-(- '-)-BV ( )Dart Total inspection observation time ..~_~ hrs/elmmj~ Total number leaks and/or equip, failures Remarks ~_~'_~. V _~_~ ~:~ ~_~ ~.~g~ ~__~.~-~. _ cc'..~J~_-~'~~Notify in days or when ready ARCO D.S. 2 Februalq; 9, 1978 Of the t~ty SSSV's tested, nine, or 45%, ~ere inoperable or failed. F~ SSV's tested szlccessfully and one f~iled. Three SSV's %~re not tested after it was found t/~ SSSV's in the %~lls %~Duld. not test. T~ese three SSV's ~.~ill be tested when SSSV's in these ~;~lls have -beech repaired. Field in _spection reports ~_re prepared and copies ~%iled to A1 Brown, prod~c~ s~i~~-it, and Den Franks, assistmlt production ~ut.~rintandent. Originals of the field ir~tm~cicn reports are attacha~ to this report. Atta~t North Alaska District Engineerin~ TRANSMITTAL To' From' J. A. Rochon/D. R. Jackson Date: December 10 Well Name' D.S. 4-6 Transmitted herewith are the follOWing for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. " Directional Survey - Gyro Single Shot Multishot Drill Stem TeSt - Test No. Dual .Induction Laterolog Formation Density Log Fo~nation Density Log/Garmna Ray Gamma Ray/CCL Laterolog Location Plat Microlaterolog Microl.og b~dlog- Interval Sample Log (A. R. C~".') - Interval Synergetic Log TVD-DIL TVD-Porosity Log Nuclear Flolog 5" ... Spinner Log 5" Receipt Acknowledged For' ._ /?,. / 9 ?? Attn' ~.~r. Donovan Jackson Please return receipt to: Atlantic ~chfield Company North ~aska Engineering P. O. Box 360 Xerox Sepia BL Line ea. ! ea. ea. .~ ea. #691 Anchorage, Alaska. 99510 DRILL SITE #4-6 PERFORATION AN~ CLEANUP RECORD ~y 8-10, 1977 D.S. #4-6 was drilled to a bottom hole location in the northwest corner, Sec- tion 3, T10N, R15E, Pru~oe Bay. Field. Depths of interest are: Measured Depth Subsea Depth Zone Top of Sadlerochit Gas/Oil Contact Perforations: (Ref: BHCS/GR of 12/25/76) water/oil Contact Base of Sadlerochit Junk Left in Hole 11584' 8507' UBS 11676' 8574' UBS 11964-11972' 8791-8797' LBS 11986-11993' 8808-8813' LBS 12000-12007' 8819-8824' LBS 12039-12082' 8849-8882' LBS 12095-12111' 8892-8904' LBS 12117-12127' 8909-8917' SMB 12133-12142' 8921-8928' SMB 12148-12183' 8933-8960' SMB Not Present - - 12220' 8989' SMB None The first gun was positioned to perforate the interval 12158-12183' M.D. with the choke set at 3/4" initially. Upon firing the FFP remained zero; however, the turbine meter rate surged to 3600 BOPD. The rate declined rapidly and was 2850 BOPD eleven minutes later when the well was SI. The second gun (a dual select-fire) was positioned to perforate the interval 12148-12158' M.D. SITP was 810 psig. The well was opened m~ 3/4" choke and was flowing at 0 FTP nine minutes later when the gun was fired. FFP rose to 25 psig, but the turbine meter failed and no rate response was available. The gun was repositioned to perforate the inte~wal 12133-12142' M.D. with the well flowing. Seven minutes after the initial perforation, the second perforations were made. The FTP rose in~ediately to ].50 psig. ~e well was SI two minutes later to allow repair of the turbine meter prior to cleanup flow. A piece of rubber was removed from the turbine meter and the well was opened on 3/4" choke. Initial FTP was 125 psig and initial rate was 5200 BOPD. In 25 minutes the FTP was 90 psig and the rate had declined to 4100 BOPD. Shortly thereafter, the FTP and rate began increasing. Fifty minutes into the flow, calcium chloride water and gas surfaced. FTP was 200 psig and the rate was ± 6000 BOPD. The turbine meter was bypassed and the clemmp flow continued. The well was flmved for m~ additional 1.5 hours until consistent production samples indicated the presence of no water. Total flow time was 2 hours and twenty minutes. Final FTP was 660 psig with a wellhead temperature of 42°F. ~ring this flow 535 barrels of fluid was recovered of which 242 bbls. was diesel, 73 barrels was calcium chloride water, and the remaining 220 barrels was reservoir fluid. D.S. #4-6 Perforation and Cleanup Record Page 2 A Fluid Density Log was run indicating the water at 12200' M.D. with a transi- tion zone to 100% oil at 12034' M.D. The third g~ (a dual select-fire) was positioned to perforate the interval 12117-12127' M.D. SITP was 1350 psig. The well was opened 3/4" d~oke and the FTP was 825 psig when the gunwas fired five minutes later. The g~ was reposi- tioned (with the well flowing)-to perforate the interval 12000-12007' M.D. The FTP was 660 psig when the second perforations were made and remained at 660 psig until the well was SI five minutes later. The fourth gun was positioned to perforate the interval 12095-12111' M.D. SITP was 1290 psig. The well was opened on 3/4" choke and FTP was 810 psig ~en the gun was fired. Pressure increased gradually and FTP was 975 psig five minutes later when the well was SI. The fifth gm~ was positioned to perforate the interval 12059-12082' M.D. SITP was 1320 psig. The Well was opened on 3/4" choke and FTP was 1020 psig five minutes when the gun was fired. The FTP was 1070 psig five minutes later when the well was SI. The sixth gun was positioned to perforate the interval 12039- 12059' M.D. SITPwas 1300 psig. The well was opened on 3/4" choke and FTP was 1075 psig when the gun was fired five minutes later. The pressure increased slightly in five minutes to 1090 psig and the well was SI. The final gun (a dual select-fire) was positioned to perforate the interval 11986-11993' M.D. SITP was 1290 psig. The well was opened on 3/4" choke and FTPwas 1110 psig five minutes laterwhen the gunwas fired. With the well flowing, the gun was repositioned to perforate the inte~al 11964-11972' M.D. FTPwas 1110 when the gun was fired. Five minutes later the well was SI. Final FTP was 1090 psig. An Amerada pressure bomb was used to determine the 8800'ss static pressure, 4378 psig. The well was flowed for 1 hour thirty minutes on 1/2" choke at ~n average 3947 BOPD resulting in 247 barrels of oil production. ]~e initial I~P was 1230 psig but had increased to 1340 psig just prior to SI With a wellhead temperature of 35°F. The Amerada showed a maximum drawdo~m (just prior to SI) of 82 psi, resulting in an approximate PI of 48.1 STB/psi. BHT was 190°F m~d fina~ SITP was 1480 psig. The total estimated volumes of oil and gas produced during perforating operations were 720 bbls. of oil and 540 MCF gas. 7/13/77 STAT~ OF A.LASIO~ North Alaska District Fmgineering TRANSMITTAL To' -- From' 9-8-77 Date' Well Name' J. A. lbchg.~/I).~J{. Jackson D.S. 4-6 ~x Transmitted herewith are the following for the subject well' Run No. BHC Sonic/Caliper Log BHC Sonic/Caliper - Gmnma Ray Log BHC Sonic/Ganma Ray Log Caliper/CCL Cement Bond Log/VDL 'Conpensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Conv.)- Core No. Directional Survey - Gyro Single Shot b~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gan~na Pmy/CCL Laterolog Location Plat Microlaterolog blicrolog Scale Mudlog - Interval Sample Log (A.R. Co.-J - )nterval Synergetic Log T\~D-DIL TkO-Porosity Log Casing Collar Log Xerox Sepia BL Line Receipt Ach~mvledged For: Date' 7-~ ~~J Please return receipt to' Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 #575 AtlanticRiChfieldCompany North Ameri~n Producing Division North Alas istrict Post Office ~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 26, 1977 Mr. Hoyle Hamilton. State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 SUbject: DS 4-1 (23-35-11-15) Permit No. DS 4-2 (13-26-11-15) Permit No. DS 4-3 (23-34-11-15) Permit No. DS 4-4 (14-36-11-15) Permit No. DS 4-5 (23-27-11-15). Permit No. ~(22-03-10-15) Permit No. 70-42 70-63 71-5 71-11 71-25 76-83 Dear Si r' Enclosed please find our Sundry Notices of Subsequent report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb Enclosures Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) O,L ~ GAS I'--1 WELL'S' WELL' ' OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360 Anchorage, Alaska 4. LOCATION OF WELL At surface 625'S & 445'W of NE cr Sec. 34, TllN, R15E, UM 99510 13. ELEVATIONS (Show whether DF, PT, GR, etc.) 64' RKB 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20111 6. LEASE DESIGNATION AND SERIAL NO. ADL 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. Dri 11 Si te 4-6 (22-03-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Fi eld-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 1494' S & 1236' E of NW cr Sec. 3, T10N, R15E, UM 12. PERMIT NO. 76 -83 3ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) SUBSEQUENT REPORT Of: MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING ABANDON* SHOOTING OR ACIDIZING ABANDONMENT* CHANGE PLANS (Other) Perforate (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Began per.f operat_igns on .5/7/77. Tstd tree, csg, tbg & wireline BOP's Pulled dummy valve. Perf'd inter~a]s--q2,158'-12,184', 12,149'-12,159', 12,134'-12,i43' w/4 shots per ft. Ran FDL,'f6~Jnd oil/wtr contact 12,196'. Perf'd intervals 12,117'-12,127', 12,095'-12,111', 12,05.9'- 12,082', 12,039'-12,059', 12,001 '-12,008', 11,987'-11,994', 11,965'-11,973' w/4 shots per ft. Ram Amerada press bombs. Flowed 'well on 32/64" Choke for 1½ hrs SI well Ran & set ball valve @ 2189' Tstd balance & control lines to 5000 p~i OK. Bled press above ball valve to 0 ~si, held OK. Installed & tstd tree cap to 5000 psi OK. Released well to Production Department on 5/12/77. 16. I hereby certify that the foregoing is true and correct T~TLE District Drilling Engineer. DATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side CONFIDENTIAL DISTBIBUTED TO: STATE OF .~LASKA DIVISION OF OIL & GAS North Alaska District Engineering TRANSMITTAl, To' From' Date- May 3!, 1977 Well Name' J. A. Rochon/D. R. jackson D.S. #4-6 Transmitted herewith are the following for the subject well' Run No. Scale BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot Multishot Drill Stem Test - Test No, 'Dual Induction LaterologFormation Density Log Formation Density Log/Gamma Ray Ga~ta Ray/CCL Laterolog Location Plat ~crolaterolog ~crolog 3~dlog - Inte~wal Sample Log (A.R. C6'.') - Interval Synergetic Log %,~-DIL TVD-Porosity Log Fluid Dens ity Xerox Sepia BL Line ea. ea. _ ~1. ea. Receipt Ackmoxvledged For: Date- Please rctmm recoipt to' /ntic Rich:field Company ~ ?¢¢Yrth. Alaska Engineering Manager P, O. Box 360 Anchorage, Alaska 99510 #425 02..001B STATE of ALASKA DEPAFJ~'~r2 CF ~%~,~%%L Division of Oil and C~s C~%servation FROM: Harold R. F~wkins Petroleum Inspector ~j:t.~f,~,/ DATE : May 26, 1977 SUBJECT: Nitr~ss Tests ~n Sk~bsurface~. Safe~.f Valve and ~aoe Control S~3fety Valve for Arco ~ 4-6 ___ur_...ghy,- ~y 12., .1977. - I left Ik~-9 wi~t Ben Davis, m~pervi~r for Arco, gill Site 4 ~0 ~tness subm=face safety valve and surface, control ?~afe~y valve on DS 4-6. Tests started c~ DS 4-6 at 3:10 The eSSSV was closed when I arrived on location with ?~ro psi on tubing. The SSo~; %~s o~ and tubin~ pressure rose to 1500 psi above ~q~%'V'. The surface control safety valve was closed. Pressure ahyve SCSV was bled t~) zero. ! observed this for 10 nkinutes. T~_re ~.~ no .build up of pressure. ~V vras ~ apened and SS~ ,:~s cl -osed, tubing~ e]Izave SSSV was bl~l 500 psi. I observed this for 15 minutes, ~cating both the subm~face safety valve and surface control safety valve did not leak. S..~qV was set at 2189 feet. Tests conclude~t at 3:55 .Lq s~Ta~_ ~ery..: I witnessed the ~3bsurfaoe safety valve and surfa~ control safety valve ~ ~ 4-6 for Arco. ~sts were satisfactory. Attadm~nt Yes No 'Item( ) Location ,General () () () () () () () () (~)' () () () () () () () () () () '1, Well Sign 2. General Housekeeping -3. Reserve Pit-('-)open( )filled 4. Rig_,, (/')' Safety Valve Tests 5. Surface-No. Wells j 6. Subsurface-No'. Wells ( ) Well Test Data 7.'Well NoS. , , , 8~ Hrs. obser , , ,. 9. :;~.BS&W , , , 10. Gr. Bbls. , , '__ ( ) Final Abandonment 11. P&A Marker Sa ti's'J:actory 'Type Inspection Yes No Item ( ) BOPE Tests (') C.,) ()' (.) () () () () () () () () () () () () () () () () () () () () () () () () 15:. "Casing set @ 16. Test fluid-( )wtr.---:--~ )mud ( ) oil 17. Master Hyd. Control Sys.- psig 1~8. N? btls. . , , , psig 1~. RT~mote Controls 20. Drilling spool- "outlets 21. Kill Line-( ) Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs flas 24..Chokes-( )Remote( )Po_s.(,~A-dj~ 25 Test~.Plug-( )Hellhd( ~csg( )none 26. Annular Preventer, __psig 27. Blind Rams ,__psig 28. Pipe Rams psig ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock psig ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve ps~g ( ) ( ) 14. Pad' leveled , ( )' ( ) 31. Safety Floor valves-( )BV ( )Dart insPection equip. Total ob:servation~time~A-'/i~,~-/~t~ys Total number leaks and/or failures Remarks .S ,S:.~',/~' ..S~ ~__. /-'? %' ~ '/'~]~../~S¥',~~' ~'~.~- ~6t _./.,~.~ (. ,,~gb",f _ cc' l?/ii~ /--j/,~/,~ ~-Notify in days or when ready Inspected by/-/~16,!~..',,jj,:y Date North Alaska Dis~r~c~ Eng,_ STATE OF ALAS~ DIVISION OF OIL ~k GAS TRAN SM I TTAL Date' May 10,1977 lVell N~_-n,~' Rochon/p. Hellstmm.' I').S.4-6 ' Trar~mitte& here!,~i~h are the folIowing for the subject well:. Run No. . Scale. BHC S6nicfCalip r Zoz- " ....... BHC SonicfCa!iper ' G~a Ray[~og .... . -:x- ~HC ~c/G~ R~ Log . -..'- C~p~r/C~. . "- . C~ent Bon& LM~L ' "C~~at~ ' ~ ' '' L6g.. ' " 1 ~e~atea Neu~bn Log Core ~~ - %nte~r~ Directional Su.r%my -. ~o -. ' - . Single Sh~t t,~altishot "" . t~rSl_l. Stem'Test - Test No. Dual Inductio~ Lauerolog · ~orma~on Dengit~ Log ~ .. _,.= ~orma~o~ Densi~r Lo~G~ Ray .. . ., . . . . · - Laterolog ',, ' . - Lo~tion Plat . . -~ . . . m -- .; .: Core No. ' Core. Ik~scri~ti'o~ C~:C) - Interuai"-- -":=': Core Description CConv-) -Cqre S~nple Log (A.R.Coi)-Interval) .~. ergetic Log -DIL '" .. TirD-Porosi~ Log XeroX: .. Sepia. i~L Line ~ .. -' '" ~ : .... -'-i '° . :- . ,''- ~. · . -- . - . : _ _~. -, , ~ ~' '. ---. '1.-, ,~ . - - · - - .... "-.-- . ReCeipt Actmowledged For: Date: 'Please return receipt to: Atlantic Richfield Co...-p. ~ny North Alaska Engineering P. O. Box 360 ": "'~"""'"" Al::::'.' ' #327 f)[STF~[BUTED TO: STATE OF ALASKA DIVISION OF OIL ~ ATLANTIC RICH~IE North Alaska DistrictEno!n~rz TRAN SM I TTAL To' From' J. A. Rochon/p. Hellstrom Date' .,. Anr~ 1 6.. 1.q77 Well Nmne' D.S. #4-6 Transmitted herewith are the following for the subject well' Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log- BHC Sonic/Caliper 'Gamma Ray Log "1BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL 1' Compensated.Pomation Density__ Lpg ........ 1 ---r~ Compensated Neutron-Formation Density _ .~ ~ Compensated Neutron Log Core Analysis - Interval .. Core No. Core Description (SWC) - Interval · Core Description (Cony.) - Core No. : Directional Suza~e¥ - Gyro Single ShOt Multishot Drill Stem Test.- Test No. 1' - Dual Induction Laterolog Fomation Density Log ~ Formation Density Log/Gamma Ray Gmmma RaM/CCL Laterolog .. Location Plat Microlaterolog Microlog Mudlog- Interval Sample Log (A.R.Co.) "inierv'al) Synergetic Log TVD-DIL · _ _ _ TVD-Porosity Log 2"& 5" 2"& 5,, · Receipt Acknmiledged For: Date: Please return receipt to: Atlamtic Richfield Company North Alaska Engineering bIanager . P. O. Box 360 Anchorage, Alaska 99510 AtlanticRichfieldCompany North Am..,~ican Producing Division North Ai a District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 25, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 4-1 (23-35-11-15) Drill Site 4-2 (13-26-11-15) Drill Site 4-3 (23-34-11-15) Drill Site 4-4 (14-36-11-15) · ' -5 (23-27-11-15) ~ (22-03-10-15) Drill Site 4-7 (31-34-11-15) Drill Site 4-8 (33-26-11-15) Drill Site 4-9 (33-35-11-15) Drill Site 4-10 (33-27-11-15) Permit No. 70-42 Permit No. 70-63 Permit No. 71- 5 Permit No. 71-11 Permit No. 71-25 Permit No. 76-83 Permit No. 75-77 Permit No. 76-10 Permit No. 76-30 Permit No. 76-42 Dear Sir: Enclosed please find a Sundry Notice outlining our plans for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer ~closur. e Form 10-403 REV; 1-10-73 Submit "1 ntentlons" In Tripllcate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT-~' for such proposalS.) o,L I--J-I GAS r--! WELLI Al WELLL---J OTHER 2. NAME OF OPERATOR ' Atlantic Richfield Company ~ ADDRESS OF OPERATOR P. O. Box 360 Anchorage, Alaska 99510 4. LOCATION Of WELL At surface 625' S & 445' W of NE cr Sec. 34, T 11 N, R 15 E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 64' RKB 5. APl NUMERICAL CODE 50- 029 - 20111 6. LEASE DESIGNATION AND SERIAL NO. ADL' 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe BAy 9. WELL NO. Drill Site 4-6 (22-03-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) 14-94' S & 1236' E of NW cr Sec. 3, T 10 N, R 15 E, UM 12. PERMIT NO. 76 - 83 14. Check Appropriate Box To Indicate Nature of Notice, Re ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS Perforate SHOOT OR ACIDIZE :REPAIR WELL (Other) SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE= Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. ,DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported, on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. Estimated start date- May 16, 1977 16. I hereby certify that the foregoing Is true and correct SIGNED .~~ TITLE District Drilling Engineer DATE (T:hls.space for State office use) CONDITIONS OF APPROVAL, IF ANy,~ Petroleum Engl neet See Instructions On Reverse Side DATE 3-30-77 Approved Copy Returned ~ .Atlant~RichfieldCompany North Ameri..c~n Producing Division North Alasl istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 11, 1977 Hr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 4-6 (22-3-10-15) Permit No. 76-83 Dear Sir; Enclosed please find the Well Completion Report along with the Drilling History and Directional Survey for the above-mentioned-well. Very truly yours, F. M. Bro~rrt D-istr±ct Drilling Engineer m~/jw Enclosures. RECEIVED JAN 1 ? Dlvtelotl of 0tl eltd Oas Corraervation t lt~o~ SUBMIT IN DU TE* STATE OF ALASKA st ruct runs on OIL AND GAS CONSERVATION COMMITTEE i i i WELk COMPLETION OR RECOMPLETION REPORT AND LOG* t~, TYPE OF WELL: OII, ~ u~S ~ WELL WELL I~ DRY Other b. TYPE OF COMPLE~ON: WELI, ~ OVER EN BACK gESVR. Other 2. NAME OF OPERATO~ Atl ant~ c R~chf~ el d Company 3. ADDRESS OF OPERATOR P. 0.8ox 360, Anchoca~e, Alaska 99510 4, LOC~,rm~ OF W~Lc (Re~ort [ocaHon c[ear~ and in accordance w~th an~ State Xt surface ~ ~ 625'S $ 445'~ of R~ cr Sec 34, 111~, R15[, ~ At top prod, tnterval reported below x~p~ 1542'[ of~ cr Sec 3 110~ ~15[ U~ ~ ' ' ' Sec 3, 727'~ & 1268'[ of S~ cr Sec 3, 110~ ~15[ ~ 1 q q~'J ~ ~z~6 ~ ~ ' ' 76-83 11/29/76 1' 12/26/76'~ 1/5/77 '~64'RKB 31'Pad 1 5 MD, ~068 T~12222 MD,905~ TVD [ Single 1 ~. ~*~-~' / , , I,,,., ~. P~OD~CINO ~RX~AL(S), OF ~IS OO~TIO~TO,~, ~O~OM, N'AM~ (MD AND ~)~ 23. WAS D~R~C~ION~L ', SU H.V~M MAD~ Top Sadlerochit 11,581'MD 8568'TVD Base Sadleroch~t 12,212'~D 9047'~D 5.API NU~IJgi{ICAL CODE 50-029-20] ] ] ^DL 28328 7. IF INDIAN, ALLOTTEE Oi{ TI{lEE NARI~ 8. UN1T,FAIlJ~{ OR L~ISE NAME Prudhoe Bay 9. ~VELL NO. DS 4-6 (22-3-10-15) 10. FIELD A.ND POOL, O1~ ~VILDC/kT prudhoe Bay - Sadlerochit .. s~.c.. T., ~., ~., <~OT~'O~ HO~ Pool OLM lgC~rlv E ) 24. TI~PE ELECTRIC AND OTHER LOGS RUN DIL/BHCS/FDC CNL/GR/Cal/CNL _ I I II ,i · 25. CASING RECORD (Report all strings set in weld CA~SLNG SIZE t \VEIGHT, LB~FT.}[-GI~ADEI I DF. PTH SET (MD) E SIZE[ CE0,~LNTING IIECOtkD 20" 94# IH-40 [ ]i~' 1;;': ' 466 CF Fond,, £mt 13-3/8" [ 72# IN-80 I 2191' !17-1/2" J lst staoe 700 _qx PFTi'~2,, 9-5/8" 47# Butt IMN-80~I 11067' 112-.1./4" I800 .q× ~.la~q G cmt ',, . I 1. . ,- I .. SCi[EE2'~ (~.D~ SIZE I)EPTI-I SET (.MD~ 'I PACI[E[{ SET (?.'ID) i i lift iiii I II I 29. 'ACID, Si:CST, l;'ilA~7i~l'i~, CEk,iKNT sQu:'~:'ZL'' I;;TC. 26. SIZE t TOP (R'ID) I iS-OTTO},'I (.MD) ] SACKS CEMENT* 7II [10,¢281 ' |12,'3015, II64sx Class ii I I 30, III DATE FIRST PI~ODUCTION NA 31.t~iS?OSlTiO~ Or (;~S (Sold; used ]or .fuel, vented", 'etc.) I I III PRODUCTION p~oDucT1ON ME i[{OD (Flo\vi~¢g, tdas lif[, pumping--size and type of pump, A?.iOUN'I' PULLED · ~2.LIISTOF ATTACHMENTS stg aOOq~ PFII thru DY @ 2186' ELL [;'1 A I'US ( Prodttcing or VCA'I'EI{~BBL. I (_;AS-OII~ I[.'CI'IO i l OlL. GRAViTY-A-PI (CORR.) \V IT'~'ES NED Division of 0it a~d Gas Coneervatton Drillina History & MUltishot diroctinnal ~,[mmv &nmh~in. 33. I hereby ~ertify that t~e' foregoing ~d attached information 1~ com~ ere h~d ~6~'Of'~-~eterm'ned from .,, ' Di stri ct Dri l 1 i no Enoi noor *(See I.$ffucfion~ and Spruces [o~ Additional D~t~ on Reverse Side) DP~PI'~i I~N'!F-~VAL (MD) 1 AZI..~UXi' AND I',.!/',~D (.)!;' 2IA'/E;:iAL USED · INSTRUCTIONS General: This form is designed for submining a complete and correct well completion report and log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown)for depth measure- ments given in c,~her spaces on this forn~ and in any attachr:~enls. Items 20, i~nd 22:: If this well is completed for separate [3rczduc'~i©n from more than one ~nterval zone (multiple completion), so state ~n item 20, and ir'~ ite,~ ?2 show the ~.~c:~t~c'~;~,(.l interval, or ~tel'vals, top(s), bottom(s) and name (s) (if any) for only the intervoI restarted in item 30. Submit a separate report (page)' on this form, adequately identified, for each additional interval to be separately produce,'J, show- ing the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each 'interval to be separately produced. (See instruction for items 20 and 22 above). ........ 34. SUMMAItY OF' F~)I{r~A'I'ION T~S'I'S IN('L,UI)INt; INq'EI{VAL TE.STEI-), I'I1E.q.qURE DATA AZqT) ftlgCOVERIV_~q OF ()IL GAS. 35. G IDOL~DG IC WAT~. AND MUD _ NAIW~ · .. · · Top Sag River 11,471 ' 8489' Top Sadlerochit 11,581' 8568' Base Sadlerochi t 12:212' 9047' _ .qB. CC)TIE DATA. A'I'I'ACII I]lllEIV DIgSCRFPITIONS OF LITIIOLOGY. POROSITY· FRACTUII~_2S. :A,'PPA.R.ENT DIPS .. AND DIgTIZCTEI) SII¢)WS OF' ()IL, GA.S OI! WATglI. _ · · · DS 4-6 Accepted rig @ 0630 hrs 11-29-76. NU & tstd BOP's. Tstd choke manifold, kelly cocks, & kill lines. PU 12-1/4" BHA. RIH to 2110'. Rev diesel w/hot mud. Tstd 13-3/8" csg to 1500 psi OK. Drld out & CO hole to 2500'. POH & went in open ended to 2500' & set plug w/600 sx of PF II cmt. RIH w/12-1/4" bit on HWDP. Top of cmt @ 2170'. CO to 2200' Plug held 30,000# weight. Pumped away to form @ 100 psi. CO green cmt to 2~82' CO' cmt stringer to 2500'. PU perforated washing tool. Washed hole fro~ 2191-2500'. POH & LD wash sub. RIH & set plug w/600 sx PF "C" w/205 sx sand in the last 100 sx of cmt. Tagged top of plug @ 2232'. Drld cmt to 2300'. Drld 12-1/4" hole to 7768'. Tstg BOPE. Cmtd 13-3/8" x 20" anul thru 2-3/8" risers w/155 sx PF II cmt. Returns 15.5 ppg slurry. Followed by 500 sx PF II cmt~_d~o~squeez'ed. 2.5 BPM rate w/max press 850 psi. Fin tstg BOPE. Washed & reamed 7~6~'8T--:'--/~68'. Drld to 11,089'. Cond mud. Ran 9-5/8" 47# Butt csg w/shoe @ 11,067', FC @ 10,988', lower FO @ 2003', upper FO @ 1919'. Cmtd 9-5/8" csg w/800 sx class "G" cmt mixed w/1.0% CFR-2 & HR-7, slurry 15.5 ppg. Bumped plug, floats held OK. Installed & tstd 9-5/8" McEvoy pkoff to 5000 psi OK. Chgd & tstd DP rams. RIH~w/RTTS & FO shifting tools. Opened lower FO @ 2003' & circ 9-5/8" x 13- 3/8" anul. Cmtd thru lower FO w/250 sx Class "O" PF cmt. Closed and press tstd lower FO to 3000 psi. Reset tools. Opened upper FO @ 1919' & pumped total of 300 bbls Arctic Pack w/50 lbs/bbl Geltone added. Break thru @ 131 bbls. Final returns 0% contamination. Closed & press tstd FO to 3000 psi. PU BHA & RIH. Break circ @ 9892'. Locate top of plug @ 10 981'. Press tstd 9-5/8" csg to 300(} psi OK. Drld FC, cmt, shoe & form to 1~,099'. Press tstd form to 11.4 ppg equiv gradient OK. Drld 8-1/2" hole to 12,285'. Ran DIL/BHC/FDC/CNL/GR/Caliper logs. Drld 8-1/2" hole to 12,285'. Cond hole for 7" liner. POH Chgd & press tstd 7" rams. Ran 7" 29# MN-80 Butt lnr w/shoe @ 12,305', top of lnr @ 10,728' Dropped ball & set 7" lnr. Cmtd w/364 sx Class "G" cmt mixed w/l% CFR-~ & 0.15% HR-7, slurry wt 15.8 ppg. Bumped plug w/3000 psi, floats held OK. PU 3-1/2" DP & RIH. Drld cmt 10,728' to 10,792'. CO to landing collar @ 12,222'. Circ & cond mud. RIH w/WSO tools, set pkr @ 10,671'. Opened tools for 1 hr tst w/initial weak blow, then dead after 25 min for balance of tst. Closed tools for 3 hr shut in, POH. Charts indicated WSO tsts OK. TIH w/6" bit to PBD. 12,222'. Circ hole clean. Chgd over from fresh wtr mud to 10.4 ppg CaC12 wtr. LD DP. Ran gauge ring & junk bskt to lnr top @ 10,728'. Ran multi-shot survey. Chgd & press tstd 5-1/2" pipe rams. Ran 5-1/2" 17# L-80 A-B Mod 8rd tbg completion string w/shear sub @ 10,625', Baker SAB pkr @ 10,493', Otis XA sleeve @ 10,383',~ajl val~_D]~_p_le 2195'. Landed & press tstd tbg hgr 5000 psi. Dropped ball & set Baker pkr. Press tstd tbg & tbg anul. RU & tstd swab valve & lubricator. Pulled dummy valve. Opened sliding sleeve & displ tbg w/260 bbls diesel. Pumped 20 bbls of diesel in 9-5/8" x 5-1/2" annul. Closed & press tstd sleeve to 3000 psi. RU & press tstd lubricator. Ran CNL/CCL/GR logs & dummy gun. Set & press tstd dummy valve to 5000 psi. OK. Press tstd tbg to 3000 psi w/200 psi on anul. Released rig @ O001 hrs 1-5-77. RECEIVED J A N 1 ? 1977 0~)01B STATE of ALASKA DEPART~!EHT OF ~-.}ATURAL RES©URCES Division of Oil and Gas Conservation Thru: H oyle H, ,Hamilton Director Lonnie C. Smith Chief Petroleum Engineer FROAA~ Harold [~. tiawkins ~.~q~/~' Petroleum Inspector, DATE : December 15, 1976 SUBJECT: To witness BOP' test mcr ~qrco DS 4-6, Sec. 3, RIO~, T15E, t~.r.-~. Peri, it Ho. 76-t~3 ~, November 28, 1976 ~ Left BP base camp at °'QO ~';. John Patterson, o~era~;o-r"-~for i\~C~ 6n lis ~-r-~, picked me up an(! took me to Arco's drill site. I toured the location and it was in gmod shape, the reserve pit was open but well-herod, the fuel tanks were steel, but not bermed and in ~ood shape. They have a ball valve and dart valve on the floor OK. The accu~,,_~lator master gauge read 2700 psi. They had six nitroten backup bottles Ydth 230~, 2300, 2350, 2350, t200, and 2000~ psi. The one bottle with 12Q0 psi ¥~ill be replaced. The contracting rig is Rowan ~35. ~qon~a=~, Nov_ember 29~ 1976 - Testing) started at G:Of) A~'.~. Annular r)reventer was tested first to 3000 psi OK. Top pipe rams, inside choke and inside kill valve ~este~ to o000 psi with check valve disabl-4 Next the outs'~' .... 1 ~4e kill and outside choke valve was tested to 5~0© psi ~K. Then ? valves away from the stack in the cellar were tested to 5000 psi and held OK. All these valves v~ere Ualliburton low torque wi)~ valves. Next the check valve was tested, but leaked and was repaired and held 50f)O !')si. The lower pipe rams v~ere tested to 5000 psi. The manifold was tested next. f~ll 7 valves tested to 5000 psi which were Halliburton torque wine, valves. The superchoke which was a Swaco 'tested to 5000 psi. The test stem was pulled and the blind rams tested to 5000 psi. The upper and lower ~:elly tested to ,-',-~n . ouuJ psi The well sign was not on location. I put on their field ticket for them to call us when the sign is on location. In su~Fm~ary: ! witnessed a BOP test for 2~rco on [)S J~-6. All [~07 components ~ere ~n ~ood workin~ r~ w' ' ' . .... or[~er .~nen I finisnec~ inspection Attachment Drlg. Permit No.~ .~' Opera'tor ,,.~, ,~,~ ~ Satisfactory Tsp~e Inspection' Yes No Item (~ Location,General () ~I 1. Well Sign (~! 2. General Housekeeping ((~) ( ) 3. Reserve Pit-(.m~open( /filled ) ( ) 4. Rig ( ) Safety Valve Tests ( ) ( ) 5. Surface-No. Wells__ ( ) ( ) 6, Subsurface-No. Well ',,( ) Well Test Data 7. Well Nos. , , () () () () ~(.) (~) ~.:.( ) ' ( ) A1 ta Oil and Gas Conservation Commq ,e Field Inspection Report Wel 1/Platfm Represented by~H~',DA~-~_Name & Number SatisFactory T,¥pe Inspection Yes No Item (,,~) BOPE Tests 8. Hrs. obser , , ,__ 9. BS&W , /', 10 Gr. Bbls. ( ) Final Abandonment (,k) ( ) (,'<) (.) (,~-,S () (~:) ( ) (,~) () (,¥) () (..~) () (,~') () (x) () (x) ( ) 15. ~l~"~Casing set 16'~'¥~rt f'luid-( )wtr.-¥-~- )mud ,(-k~) oil 17. Master Hyd. Control Sys.-,,]~_d~si,Q 18. N2 btls~,~~,~~s~._~ 19 Remote C6-~-{¥ols 20. Drilling spool- ~,~ "outlets 21 Kill Line-(~) C~ 'valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold Ho. valvs~___flgs~__ 24. Chokes-(/~')Remote( )Pos. (--!)Adj. 25. Test Plug-(-~)~iellhd( )cs,o( )none 26. Annular Preventer~~si~ · ) 27. Blind Rams~_~psi9 " ( ) ( ) 11. P&A Marker (~) ( ) X28 Pipe Ramsc~~_psig ( ) ( ) 12. Water well-( )capped( )plugged (.-~) ( ) 29. Kelly & Kelly-cock~'~"_~m~ psi9 ( ) ( ) 13. Clean-up (<) ( ) 30. Lower Kelly valve~'?~_m,~ psig. ( ) ( ) 14. Pad leveled ~h (~) ( ) 31 Safety Floor valve~BV ~D~rt Total inspection observation time rs/days Total number leaks and/or equip, failures Remarks ~~[~ ~ ~ ~ Z~ ~~_ ,~M~ ~,~t~E~ A~ ~~ ~~ ,,:,cc:'~~ ~/~[~Notify in days or whe~ e~dy Inspected by~~/~ Date/~ i AtlanticRichfieldCompany North American Producing Division North A~as! ~istrict Post Office =,~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 8, 1976 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 4-6 Permit No. 76-83 Dear Sir: Enclosed please find the Monthly Report of Drilling Operations for the above mentioned well. Si ncerely, C. R. Knowles District Drilling Engineer CRK/jw Enclosures R]~T. STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WOR'KOVER OPERATIONS SUBMIT IN DUPLICAT~'- ~API NL~'IER1CAL CODE 50-029-20111 LEASE DESIGNATION ~%XD SERIAL NO. ADL 28328 WELL WELL OTHER 8. L~IT FA/'K~ OR LEASE NAME Prudhoe Bay 99510 2, NAME OF OP]~TOR Atlantic Richfield Company ~. AbD~SS OF OPs~OR P. 0 Box 360, Anchorage, Alaska 4. LOCkTION O,F WELL 625'S & 445'W of NW cr Sec 34, TllN, R15E, UM 9, WELL NO DS 4-6 (22-3-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadleroch~t Pool -n. SEC, T., a., ~.~ ¢~O"~rOM OB.J'~3TD. r~ Sec 3, T1ON, R15E, UM l:1. PEP,.MIT NO. 76-83 13. REP~DRT TOTAL DI~T'H AT END OF MONTH, CHA~'qGES IN HOLE SIZE, CASING ANT) CE/VIF2qTING JOBS INCLUDING DEPTH SET AND VOLU1VII~S USED. PERFORATIONS, TESTS AND RESULTS. FISHING JOBS. JUNK IN HOLE AND SIDE-TI:~ACKED HOLE AND ANY OTHER SIGNIFICANT ~GF~ IN HOL~ CONDITIONS. Accepted rig @ 0630 hrs 11-29-76. NU & tstd BOPs. Tstd choke manifold, kelly cocks, & kill lines. PU 12¼" BHA. RIH to 2110'. Rev diesel w/hot mud. 1~. 1 "hereby ce~'~F tl~'~ ~e f~re~otr~ i~ true ~d eorrect ......................... ...................... - ,,, - ._. - - .,- . - ,, ,, NOTE ~eport off thio form lo required for eOCh GQlendor ~nth~ regQrdleos of the itotus of operations, and must ~ flied in duplicate with th · oil and gas eonlervatbn Qommi,ie by tho 16~ of the lue~flding mon~. unlen otherwise directed. Conservation November lg, 1976 Prud~ Bay DS ~6 (22-3-10-15) Atlantic Richfield Company Sta~ Permit NO. 7~ M. Waggoner Senior Drilling Engineer Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska g9510 Sir: Enclosed is the approved application for permit to drill the above referenced well at a location in Section 3, Township loll, Range l§E, U.M. 14ell samples, core chips, and a mud log are not required. A directional survey is r~uired-. t4any rivers in Atas~ and their drainage systems have been classified as impotent for the sp~ing or migration of anadromous fish. Operations in these areas are subject to AS t6.50.870 and the r~ulations promulgated thereunder {Title 5, Alaska Administrative Code). Prior to commencin~ operations you may be c~qtacted by the Habitat Coordinator's office, Depart- merit of Fish and Game. Pollution of any wa~rs of the State is prohibited by AS 46, Chapter 03, Article 7 and the. regulations .promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70} and by the~ Federal b~later Pollution Control Act, as a~nded. Prior to con~encing operations you may be contacted by a representative of the ~partment of Environmental Conservation. Pursuant to ~ 38.40, Local )(ire Under State Leases, the Alaska Deparb~ent of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. ~e would also like to be notified so that a repres~tative of the Division may be present to witness testing of bi,ut preventer equipment before surface casin~ shoe is drilled. M. Waggoner -2- November 19, 1976 In the event of suspension or abandonment please give this office adequate advance notification so that we may have a witness present. The operator may not produce this well until an exception to Conservation Order lto. 137 is obtained permitting completion of the well with the surface casing set less than 50t) feet below the base of the permafrost. Encl osu~e CC: Oepartment of Fish and: Gaae, Habitat Section w/o encl. ~~~ of Envi~ntal Conservation w/o encl. Oepartment of Labor, Supervt sot, Labor Law Compl iance Oivision w/ enct. ticRichfieldCompany North American Producing Division North Alask~ strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 October 27, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99504 Subject: DS 4-6 (22-3-10-15) Dear Mr. Hamilton: Enclosed please find our Application for Permit to Deepen DS 4-6 along with the $100.00 filing fee. For your information, as well as for the State Department of Labor, this well will be drilled from the surface and target location on Lease ADL 28328. Very truly yours, ~ ~Kn°wles ~/~/' ilt ict Drilling Engineer Enclosures e · Form 10-401 REV. 1-1-71 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DEEPEN [] la. TYPE OF WORK DRILL ~-~ b. TYPE OF WELL OIL GAS WELL ~'1 WELL ['--] SUBMIT IN TRIt rE (Other instructio~ ,n reverse side) SINGLEr'G'! MULTIPLE OTHER ZONE L~ ZONE I I ~. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. O. Box 360, Anchorage, A1 aska 99510 4.LOCATION OF WELL Atsu~£~c~lS & 445'W of NW cc Sec 34, TllN, R15E, .UM At proposed prod. zone 1415'S f 1430'E of NW cc Sec 3, TION., R15E, UM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 6 'miles NE of Deadhorse API No. 50-029-20111 6. LEASE DESIGNATION AND SERIAL NO. ~DL 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. DS 4-6 (22-3-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11.SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 3, T1ON, R15E, 12. Poo': 14. BOND INFORMATION: ~EStatewide Suretyand/orNo. Federal Insurance Co. #8011-38,40 · ~mou.t $100,000 15. DISTANCE FROM PROPOSED * 16. No. OF ACRES IN LEASE 17. NO,ACRES ASSIGNED LOCATION TO NEAREST TO THIS WELL PROPERTY OR LEASE LINE, FT. 1415 2560 (Also ,o nearest drig, unit, it' any) 320 18. DISTANCE FROM PROPOSED LOCATION 19. PROPOSED DEPTH 20. ROTARY OR CABLE TOOLS TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 25451 12,850'TD Rotary 21. ELEVATIONS (Show whether DF, RT, CR, etc.) 22. APPROX. DATE WORK WILL START 64'RKB, 31' Pad Elevation (Gravel) Nov. 12, 1976 23. PROPOSED CASING AND CEMENTING PROGRAM , , SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quantity of cement .. 32 20" 94 lbs. H-40 112' Circ to surface approx 500 sx . 17~ 13-3/8 72. lbs MN-80 2191' 1st stage 700 sx PF II, 2nd stage 400 SX PF II throuqh DV tool_ at 48 12~" 9-5/R" 47 lbs MN-80 11160' P.rimary 1200'+ (700 sx Class Gl · ' S00-95 . 2nd stage 3005-+ @ 2000 downsqueez_e (300 sx of PF "-C") 8'~"' [ 7" lnr ' 29 lbs '" MN-80 ")2650' . 1800'+_ (50'0 sx of Class G) See Attachment DIVISi©N OF (31[ /:.?,!D CA..; IN ABOVE SPACE DESCRIBE PROPOSED PROGRAbI: If proposal is to deepen eve data on. present productive zone and proposed new productive zone. If proposal is to drill or deepen dixecfionally, give pertinent data on subsurface locations and measured and true vertical depths. Give blowout preventer program. 24. I ~hat tab~FoI~oing is True and Correct ~rhiS spa~e for State office use') //0 JSAMPLES AND CORE CHIP~REQUIRED [['-]YES ['~NO I DIRECTIONAL SURVEY REQUIRED I ~YES ~NO MUD LOG [] YES CONDITIONS OF APPROVAL, IF ANY: OTIIER REQUIREMENTS: A.P.1. NUMERICAL CODE 5O-029-2O111 PERMIT NO._ 7fi~3 ...... APPROVAL DATE ,, ,, · Exec. Sec APPOVED BY_: ~'~'~'~ ,TITLE . ' · See Instruction On Reverse Side No?mhor 19, lq7fi DATE November 1.97_6_ Atlantic Richfield Company proposes to use an existing conductor and 13- 3/8" casing installation at the above surface location. This 13-3/8" casing was landed at 2191' with 3 strings of external mounted sensors to monitor the freezeback process in the permafrost in February 1972. To study the freezeback influence of drilling mud in an open hole annulus, the shoe was cemented back to a depth of 1580'. A second stage job was per- formed through DV tool at 486'. The cement top was determined to be 400' based on a CBL. The permafrost base is at 1812'. Atlantic Richfield Company asked that this well be permitted as an exception to Title ll, Alaska Administrative Code, Section 22.540, Convervation Order No. 98-B, Rule 3(c). This exception was discussed on October 22 by John Miller of the Department of'Oil and Gas, and M. L. Waggoner, for C. R. Knowles, District Drilling Engineer, Atlantic Richfield Company. Atlantic Richfield Company proposes to directionally drill this well to 12,850'MD, 9085'TVD to produce the Sadlerochit zone. Dual Induction Laterolog~, Self Potential, Sonic, Gamma Ray, Density, Caliper and Com- pensated Neutron Logs will be run from TD to the shoe of the 9-5/8" casing (8220'TVD). A 13-5/8" 5000 psi Hydril, two 13-5/8" 5000 psi pipe rams and one blind ram will be used on the 13-3/8" and 9-5/8" casing. The BOP equipment will .be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A single 5½" tubing string, packer, and appropriate subsurface safety equipment will be run in a weighted calcium chloride solution. The tubing will be displaced to the top of the packer with diesel. ATLANTIC RICHFIELD COMPANY No'rth Alaska District Engineering TRANSMITTAL Date: Transmitted Herewith are'the following for the subject well' Run No. Scale Xerox Sepia B1 Line , : , L BHC Sonic/Caliper Loo BHC/Sonic/Caliper- Gamma Ray Log BHC Sonic-Gamma Ray Cement Bond Log Core Analysis Interval Core No. Core description (SWC) Interval Core description (Conv) Core No.------ Directional Survey Drill Stem Test Test No. Dual Induction Laterolog Formation Density Log FormaJbion Density Log-Gamma Ray Gamma Ray-Neutron Laterolog Microlaterolog Microlog Mudloo Interval Proximity-Microlog/Cal iper Log Sample Lo.~ (ARCO)) Interval Sidewal 1 Neutron Porosity Synergeti c Log · / ,, , 1.11.1..1.11_. -- . i i Date: Please return receipt . Richfield Company North Alaska District Enoineer P. O. Box 360 Anchorage, Alaska 99501 By: i 7 1972 AtlanticRichfieldCompany North A~e~,3n Producing Division North A~.i. District Post Office Box 360 Anchorage, Alaska 99501 Telephone 907 277 5637 March lO, 1972 State of Alaska Department of Natural Resources Oil and Gas Division 3001 Porcupine Drive Anchorage, Alaska 99504 Attention' Mr. Homer Burrell RE: Drill Site #4-6 (23-25-11-15) Gentlemen' We are enclosing the Well Completion Report along with the Well 'History and Directional Survey for the above mentioned well. Very truly yours, ?/L./N. Bell Sr. Dist. Drilling Supervisor LNB/WTJ/sw Enclosures SUBMIT IN DIT OIL AND GAS CONSERVATION COMMITTEE M r'd,'I l(,ns On WELL cOMPLETION OR RECOMPLETION REPORT AND LOG* II 5. AP1 NUM_EtLICAL CODE 50-029-20111 6. LEASE DF-~SiGNATION A_ND SEiqIAL NO, ADL 28324 ia. TYPE OF WELL: b. TYPE OF COMPLETION: .~EW ~--~ wogK F-- w z r.L OV ER OII, ~ GASI~l ~ WELL WELL ~ DRY Other DEEP-[~ PLUG[] DIFF. BACK R. EN UESV ~ Other Suspended NAME OF OFERATOK Atiantic Richfield_ Compan.y , ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 7. iF IND1A_N, A2~LOTTEE C)it T]L1BE NAhLE 8. UNIT,FA_IIiV~ ali Lb~ISE NAhlE LOC^TION OF WELL (Report location clearly and in accordance with any State requirements)* ~t~e 625' S & 445' W fr NE cr Sec 34, T10N, R15E, Um At top prod. interval reported below ~ /' 625' S & 445' W fr ~ er Sec 35,/T10N, RISE, ~ Prudhoe Bay-Sadlerochit 11. SEC., T., I{., M., (L{OTTOM I~OL.E OLld EC~rlVE) Sec 25, TllN, R15E, UM 12. PETt~IIT NO. ... ,,...~ 71-35 I ! I-~OW l~ Y * { ROTARY T00LN [ ..... CABLE 2750' ~ 2110' ~ / I 0'-2750' ~. PRODUCING IN~RVAL(S), OF ~IS CONP~TION--TOP, BOSOM, N'AME (MD AND ~)~ - - . 23. WAS D!HECTIONAL :"'~ ' ",~ SUHVEY MADE ' .h ,.- : . ~/A ~ '"~ '' 24. TYPE ELECTRIC AND OTH~ LOGS RUN ~ ~ i ~. h-Arm Caliper, Sonic-GR, Formation Density & DIL h:~ i i i i ,, CASING R~CORD (Report all strings set in w~ll) 205 '94~ I H-40 t 118' / ~q" 1a66 ~e Won&,'"h~m.nt i -O-,,, , z3-3/8" 72~ / N-80 I 2191~ ~7-]/2" iisi gf,~.g~ 7~ ~w p~rm, fr~L TT ... ! I , 1' 26. LINE~ E .O I27. TUBING TOP (A,ID) ~OTTO~ (MD) SACKS CEMENT* SC5iE~ t~D~ SIZE DEPTI-I SIdF (..2D ~ PAt:I~.R SET , MD) ii / I Ill I] I I [ i 28. PERFORATIONS OP~ TO PRODUC~O~ (~ntcrval, size and number) ' 29. ACID, SHOT, l;';iA_7'1 O-I.iE, C~L,LKN'[' SQULY:Z2~, ETC D~T~i IZ~7 ~V.~ (MD) iii I II I I I I I i i III 30. P t~O D UCTI ON DATE F~RST Pi~ODUCTION [ P~ODUCT1ON MEiHOD (Flowh~g, ~:.~3 life, panuping~sizc and type of pump~ CI{OS{E SiZ~ PP~OD'N FOR OI~BBL. GAS--AICF. T~s'r ~tlOD FLO~V, TUBING CA~I'.~q"G PRESSUR~ ICAt. C~T~ OI~BBL. GAS--r~ZCF. 31. DISPOSITION OF~aS (8otd, u~ed~or~ue[,vented, etc.) AML~UNi' ~,klqD I',Ab.'D O!" MA'IEiIiAL ]WATER--I3BL. I OIL GIIAVITY-API (CORR.) I TEST WITNESSED BY 32. I. iST OF ATTACHMENTS Well History~ Sperry S~un SRrvey 7~3. I hereby certify '~h~t th~Tre~oin~nd_~,Lt~hed information is complete and correct as determined from all-avalla e , , . i ~ I I I II II *(See Instructions and Spaces I:or Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for :~ubmitting a complete arid correct wail completion report end log on all types ' tan:]~ and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise sho',,v~) {or depth measure- ments given in ether spaces on this forr"n and in any attac:!~ments Items 20, and 22:: If this well is completec'l for separate prcduction from more than one interval zone (multiple completion), so state ~n item 20, and in ite,'~ 22 show the prcJuc,ng interval, or intervals, top(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, show- ing the acfditional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMAt{Y OF ~'O}:LMATI0'N 'PLkS'I'S IN('L.LII)~N(; INTEI[VAL TF,.q'FEF). l'}{E~skqUl]E DATA AR, CD P,.~COVERIE, S OF ()IL. GAS. 35. G IDO[,OG I C WA'I'TgI{ AND MUD NAME MEAS. N/A , ~/^ ,2fl. COT1E DATA. Aq'I'ACII BRIEF D~C~IPITIONS OF LITIIOLOG¥, POIROS}TY. F[/At-'TURI~S, APPA. RIgNT ]DIPS AND. DK'I'~'-(fTEI) .'~IIO.WS OF ()IL, GAS Oil N/A · r:\lff]o' s w. ! . |)riot St;,,tus ltouriO A.'~. if a NV. O. 2-- 9- '? 2 1551' 2150' Complete Becord for each Day Beporte,t t. " 6. i.lovei in crews. TM ........ to ski! rzS ..... '~"', i)S ~,-,~-~: o ,,. DS {/h._6 (~-:0-~:5 5) NOR?H .... - AYi 50-02o-;:0-~I~ DS f},~-6 (23-25-11.-15) -NORTH SLOPE- ..'\T~! 50-029-2011.1 RU Jacked r{,~' to P'~-6 Set in draYnzoz'l.cs RU DS //4-6 (z~_~_..5_]~_-i5), ,-,-' ,-, ~ __ ~_:,v,;:,rH.,~_:,_~. SLOPE _ :t. rr,~T_ ¢.q0-02g-2011t. Prep to ~m}d {} 6 Al,{ - N!'/ 0.7~, Vis 90. RU Nade a 20" x 22-1/4" n~'~ *'::'~ X,-d~'~] & lines Pulled to ce;!%er of hole. Skid rails of center. PU DCs spud_ ztOR=d SLOPE - ApT 50-029 20111 t~L~.-o {23-25-1t-15) -'~ ~" ---- OlO' (o ~',' _ ~ ...... '"" . . ~ ~t_,,, ) r~:-.-~!qing ->i¥'; 8 8~, V~s 300 :i,:i~hed .... S'cuE '~ !0:nn APl 2-!~,-~ ....... ~ ....... nu. c .... ~ 1~ ~79 Dt'Jlled ].7-!/2" hole Lo 910' .Surve}*: 9~2' t/~° i;" ' '23-25-! ~- ~..~r.p~,u ^~,- ~n no9_20111 DS /a-6 ( 1-11) - ~,,~.~:~ SLOPE - q~Aq , (%7' ' . 0 ~ ) POX 9 5// V~s 2~5, ~'~ Dz,~-~ . ~'.~,=~, hopp~= freezing ]..imitin~ mix_i.n~r _.:~ea 17-!/2" hole 9i0-158!' ~'~"~ ...... -~',~ ice ~'~'?:~ in 20" '~ ,p~c-~ ~' be~o,.~ 20" bm~m' Hav:[~:~ t". thaw out ice to ~:Ox w, Survey': 1i0~' 3./1~®. "~ / 'P'R-O~ ~' ~q)- NORTH SL0!'!C - APl .,~O-u,n2°-20]il 27[¢0' ('~Xo,) Trit-,eim; i.iW o 7/, Vis 240 UL S ~ - ~ rI *~ ,..~n'~ii!.ed !7-!/~ ¢'' }~o-~ ........ e !951-z ~SO' i'[ol.e ma. dc ~:' 4' O0 AM ~:-1. ~ - ('~:. · ....... _ · '- "":' 2[:,-il_-i [: } - "~Ri'R 'oLu:-rt. A.: t 25 :~:~-0 t,:: ...... ' ..... - '-- 2 7' F: :h ' / ' - .-.,~.,~ kO ) - ZU SchL - ?il'~ g.57, Vis !30~ ,,,= 5. iZai t. cd .... Sc}:i :?~ hours could not =~v i" du~ to :'ad we:{:.ti or , Survey: :";'l~O' , c , , DATE INSTB!~q;TIONS: This form is used during drilli_~g or workover operations. If testing, coring, or perforating, sbt,- fo~mata<n name ~n describing work performed. ~{umber ail drill stem tests sequentially. Attach description of all cores. ';'ork per- formed by Productn~x :,c. cti. o~a wilt be rei~orted on "IN'Di~I~;" sheets unlit final ,:ompl~.t~on. l/el, orr official or ret, re:~entatxve test on "FI~4AL" foray. (1)Submit "INTE~tiM" sheets ~'han f}.Iled out but not [tss frequently than ever)' 3(} days, or (2)on Wednqadav of the week in .hich oil string is set. Submit ~eekly for .ork~vers and following setting of oil atr~ng until co~-,pl,.txon. District Field DAILY WELL HISTORY - INTERIM NORTH ALASKA County or Parish NORTH SLOPE State L,S //4-6 ~Sell No. DRUDiiOE BAY Lease or Unit Date & Depth at 8:00 A.M. 2-22-72 2750'TD 2-23-72 2750'TD 2-24-72 2750' TD 2-25-72 2750' TD 2-28-72 2750'TD 2-29-72 2750 ' TD 3-1-72 27 50 ' TD 3-2-72 2750 ' TD Complete Becord for each Day While Drilling or Workover in Progress DS //4-6 ( 23-=5-11-15~ ) - ~=~NORTH SLOPE - AP1 50-029-201]-1 ( -n 3-"o/u/°" ¢ 2750'TD 2110'PBD - Circ in 13-3/8" csg - I.'5.7 9.5~?, Vis 130, WL ~. Ran 60" h-arm caliper log, Sonic-GR, Formation Density & -il. Log bottom ~ 2747'. 1/2 trip in hole, conditioned mud for 13-,/ · 13-3/8" 72// N-80 buttress csg. Stuck csg ~ 2191'. Worked 13-3/8" cs~. 70 bbis pipe lax, could not work pipe free. Shoe ¢ 2191'; float collar h ~ oh .....~oto~ s 2110'; DV ¢ .80'. Thermistor cable ~ 1286' & 15 * ~' ~''" in hole. . "~-~ stare Transducer cable ~ 1036' & 786'. 14 transducers in hole Cemented ~ 2!91' w/700 sx Permafrost II. Mixed 15.4 ppg w/full mud returns. w/1500 psi, CIP 3:04 PM 2-20-72. Opened DV ~ 486' w/600 psi. Circ bcvtem3 uT. Cemented 2nd stage w/400 sx Permafrost II. First 200 sx mixed to 15.4 the 2nd 200 sx mixed to 1500 ppg, had full mud returns. Plug b~ped w/'!.~30 7si. CIP 4:37 PM 2-20-72. Opened 2" riser pipe w/3500 psi. Dis~!aced annulus w/7[ bbls water. Pmnped 100 bb!s 8.0 Ken-Pak thru 2" riser in ~lace 6:30 PH 2-26-72. Last s~ple of Ken-Pak 0.6% water. DS #4-6 (23-25-11-15) - NORTH SLOPE -API 50-029-20111 (13-3/8" ~ 2191') 2750'TD 2110'PBD - Circ w/water. OMITTED FROM 2-22-72 REPORT: NU. Tested speed head w/2000 psi OK. Tested cs5 w/1500 psi OK. Drilled DV 484-486'. Tested'csg & DV w/1500 psi OK. R! & tagsed float collar ~ 2110'. Circ. 2-23-72 - Circ & cond mud ~ 2110', top of float collar. Displaced mud w/fresh water. Installed ste~n coils in mud tanks. Ran SS gyro w/50! stops. RIH w/ OEPD to 2108'. Started circ w/hot water ~ 5:30 PM 2-22-72. ~ 6 ~ 2-23-72 water in ~ 98°, out ~ 94°. DS #4-6 (23-25-11-15) - NORTH SLOPE -API 50-029-20111 (13-3/8" ~ 2191') 2750'TD 2110'PBD - Circ water. 6 PM 2-23-72 - water in ~ 101°, out ~ 97°. 6 AM 2-24-72 - water in ~ 116©, out ~ 112°. DS #4-6 (23-25-.11-15) -NORTH SLOPE- AP1 5O-O29-2O111 (13-3/8" ~ 2191' ) 2750'TD 2110'PBD -Circ w/water. Water in ~ 113©, out ~ 110°. DS #4-6 (23-25-11-15) - NORTH SLOPE -API 50-029-20111 (13-3/8" ~ 2191') 2750'TD 2110'PBD - Circ w/water. Circ water ~ 12 BPH in ~ 113°, out ~ t10°. DS //4-6 (23-25-11-15) - NORTH SLOPE - AP1 50-029-20111 (13-3/8" ~ 2191') 2750'TD 2110'~BD - Cite water ¢¢ 12 BPM; 133© in, i10© out. DS #4-6 (23-25-11-15) - NORTH SLOPE - AP1 50-029-20111 (13 3/8" ~ 2191') 2750'TD 2110'PBD - Cite ~ 12 BPM; 113° in, 110° out. DS #4-6 (23-25-11-15) - NORTH SLOPE - AP1 50-029-20111 (13-3/8" ~ 21al') 2750'TD 2110'PBD - Circ til 6 AM. 3-2-72 P0tt RU to run The Abos'e is Correct: · SIGN~TUBE TITI.E [)ATE North District Dril['[n.~: Sut,erv:isor 2 PAGE NO, (NUMBEIt Al,1. DAII.Y ~ELL tlISTORY FOilMS CONSECUTIVEI,Y AS TitEY ARE PIlEPAIIED FOIl EA£11 ~'EI.I,, ) _!.~T.[!j~]j]I..~?~.: Prepare and r, ubmit the F!NAL Il[POnT oa the first Wednesday after allowable has been assigned or ~ell ia Pl,.~gged, Abandoned° or Soid. ["~4&l, i?;t~oi[r should be submitted also ~hen operations are ~,uspended for an indefinite or approachable lenxt}: of timeo ('In work.vets when an official teat is no~ required upon completion, report completxon snd repreae.tative test dat. a in biocka provided, The FINAL t![ipo[lr form may bc used for reporting the entire operation if apace is DAILY WELL ttiSTORY - FI~IAL REPORT District State County or Parish Field r~i~r~;:OX' BAY Lease or Unit DS j/4-6 ~'ell No. Auth. or W.O. No .... ].p207L Title Operator, Spudded or W.O Begun RICHFIELD CO~= ~Y TARCO'S W.I. Prior Status Date 2-14-72 Hour lO'O0 g2.kf a W.O. 5,q~ Date & Depth as of 8:00 A.M. 3-3-72 2750'TD 3-6-72 2750 'TD 3-7-72 2750'TD Complete Record for Each Day Reported DS #4-6 (23-25-11-15) - NORTH SLOPE -API 50-029-20111 (13-3/8" ~ 2191') 2750'TD 2!I0'PBD - RD - Ran SS gyro & Sch! 4-arm caliper. Displaced mud from 2!10' w/400 bbls diesel. Had clean returns. Pulled up to 270'. Dis- placed w/50 bb!s diesel w/good clean returns to surface. Filled tree & all valves w/diesel. Tearing out. DS #4-6 (23-25-11-15) - NORTH SLOPE -API 50-029-20111 (13-3/8" ~=_~y_.~n-,,) 2750'TD 2110'PBD - RR 4:00 ~2,1 3-3-72. Set out pump & draw-works. Skid rig to DS //4-5. Removed windwalts, iD. Prep to lay down mast. DS #4-6 (23-25-11-15) -NORTH SLOPE- AP1 50-029-20111 (13-3/8" 3 2191') 27S0'TD 2110'PBD - RD. LD derrick @ 6 PM S-6-72. Suspended well. FINAL REPORT. Old TD New TD 2750' PB Depth 2110' Released Big Classifications (Oil, Gas, etc.) 4:00 AX Date 3-3-72 Oil - Suspended Kind of Rig Type Completion (Single, Dual, etc.) Producing Method Official Reservoir Name(s)~r~hoe Rn.y ~a.dle ~_o~hi, t - Potential Test Data: OIL OR PRODUCTION WELL NO. DATE RESERVOIR PRODUCING INTERVAL TEST TIME .... GAS OIL ON TEST GAS PEI1 DAf PUMP SIZE, SPM X 1, ENGTtl CHOKE SIZE T. P. C. P. ~'ATEB % GOII GRAVITY AI, I,O~AI~I,E EFFECTIVE DATE - COBflECTF~D .......... · Distribut ion: Orig.' Drilling Section - Dallas cc:- District Office Engineering Division - (720) Co-Owner(s) - As Appropriate Regional Office, ~'ell |tecord File The Aboye is Correct: S I GNATU}IE DATE North TII'I,Z PAGE NO. (NUgtI'~Etl ALL DAII,Y WELl. }IISTORY FOR,~tS (?.oNSEcuTIVELY AS TtlEY AI1E PtlEPARED FOR EACII ~'Ei.I.. ) ,~B-459-3 Eastman/ ; ~¥hipstockl A PETR©LANE COMPANY of SU~-SURFACE DI~EC T~O~J~ L Atlantic Rich£ield COMPANY D. S. 4-6 WELL NAME Prudhoe LOCATION TYPE OF SURV~? Gyroscopic v SURVEY BY Shyam Talwar OFFICE Alaska ZO~4PLETION REPORT jANUARY 13, I976 ~TLANT[C RICHFIELD COHPANY DRILL SITE 4-5 3YROSCOPIC SURVEY DECLINATION 31 DEGREES EASI ?ADIUS OF CURVATURE ~.-.~ETHOD OF COMPUTATIONS K,~. ELEV. 6~00 .qO~.~PUTED FOR EAST~qAN WHIPSTOCK INC. DY F, k!. LINDSEY AND ASSOCIATES ~ECORD OF SURVEY ALL CALCULAT]ONS PERFORMED ~%Y I B ~4 ELECTRONIC CO[qPUTER TRUE ~'E'AS. DRIFT VERTICAL DEPTH ANGLE DEPTH D M SUB DRIFT SEA OIREC DEG. 0 0 0 0.00 lO0 0 0 100.00 2O0 O 0 200.00 300 0 20 299.99 ~00 0 30 399,99 500 0 30 499.99 600 0 25 599.98 700 0 ~0 699,98 8~O O 10 79~.98 900 0 15 899,~8 1000 0 20 999,97 -64.00 S14,00E 36.00 SI~.OOE 136.00 514.00E 235.99 514.00E 335,99 S30,OOE 435,99 532.00E 535,98 $ 5,00£ 635.98 S40,OOW 735.98 NIO,OOE 8~5.98 N ~.OOW 935,97 N26.OOE 1100 0 45 1099,97 1035,97 NGI.OOE 1200 0 55 1199,96 1135.96 N80.OOE 1300 0 ~0 1299,95 1235,95 $78,00E 1,400 0 30 1399,94 1335,94 S16,00E 1500 0 30 1~99.94 1600 0 30 1599.94 1535.94 S21,OOW 1700 1 0 1699.93 1695.g3 S~O.OOW 1800 0 30 1799.92 17~5.92 S52,00W 1900 0 ~5 1899,91 1,835,91 S46.00W 2000 0 90 1999,91 1g~5,91 N41,OOW 2100 0 0 2099.91 2035.91 N41,OOW 2200 2 0 2199,89 2135.89 N52.00E 2300 1 O 2299,85 2235.85 Ngo,OOW 2~00 5 20 2399,67 2335.67 548.00w TOTAL COORDINATES 468.15 N 100.21W 468.15 N 100.21W 468.15 N 100,21W 467,86 N 100,13 W 467.18 N 99.86 W 466.43 N 99.41 W 4.65.67 N 99,15 W 464.78 N 99.~ W 465.01 N 99.93 W 465.37 N 99,91 W ~65,87 N 99.81 W 466J55 N 99.17 W 467.0~ N 97,79 W 467.01 N 96,~0 W 466.35 N 95-69 W 465,50 N 95,50 W ~64,64 N 95.58 W ~63-52 N 96.24 W 462.61N 97.18 W 461.90 N 98,00 W 461.94 N 98,98 W 462,27 N 99.26 W 463.82 N 99.11W' 465.71N 99,76 W 463.77 N 104.81W CLOSURES DISTANCE ANGLE D M S 478,75 N 12 4 55 W 478,75 N 12 4 55 W 478.75 N 12 ~ 55 W 478.45 N I2 g 51 W 477.73 N 12 3 57 V~ 476,91 N 12 I 54 W 476~I1 N 12 1 15 W ~75,30 N 12 4 35 W ~75.62 N 12 7 g~ W 475.98 N 1Z 7 1 W ~76.~4 N 12 5 34 W 476,97 N 12 0 0 W 477.17 N 11 49 ~5 W 476,86 N 11 39 ~9 W 476.07 N 11 35 46 W 475,20 N 11 35 37 W ~74.37 N 11 37 27 W 473,4i N 11 43 g8 W 472.71 N 11 51 50 W g72,18 N 11 58 46 W 472.42 ~ l g 5 38 W 472.81 N 12 7 10 W 474.29 N 12 B 44 W 476.28 N 12 5 29 W 475.47 N 12 44 6 W DOG LEG SEVERITY DEG/IOOFT 0.000 0.000 0.000 0,3/*0 0.160 0.017 0,070 0.240 0,500 0,080 0,090 0,410 0.180 0.260 o.170 0,052 0.267 0,500 0.500 0.250 0.250 0 · 500 2.003 1,001 4,355 5ECTI~ DISTA ~c -338,12 '338.12 -338,12 -337,91 -337,50 -337,tl -336.61 --335,71 -335,6~ -337,35 -338,5[ '339-2 -339.07 -338,46 -337.70 -336,~0 '335,12 '-33~.08 -~33.58 -333~70 -335,08 -336,31 -331,94 RECORD OF SURVEY ALI.. CALCULATIONS PERFOR~4ED [~Y ! B ? ELECTRONIC COh!PUTER TRUE MEAS. DRIFT VERTICAL DEPTH ANGLE DEPTH D ~J SUB DRIFT SEA DIREC DEG, TOTAL COORDINATES 25n0 11 0 2498.62 2434.62 2630 15 30 2595.93 2531.93 S42.00w 2700 19 40 2691.24 2627.24 $25.50W 2800 24 30 2783.87 2719.87 S18,00w 2900 27 !5 2873.84 2809.8~ S18.00W 3000 2g 50 2961.67 2897,67 S18,50W 3100 33 30 30~6,77 2982-77 S21,OOW 3200 37 10 3128.33 306~.33 $22.00W 3300 ~1 0 3205,94 3141.g~ $22.50W 3~00 43 20 3280.05 3216.05 S23.00W 3500 45 45 3351.32 3287.32 ~600 48 30 3~19.35 3355,35 $25,50w 3700 50 0 348~.62 3420.62 S26,50W ~800 50 40 ~548.45 3484.45 $~7.00W 3900 51 0 3611.61 3547,61 $27.00W 4000 51 15 3674,37 3610,37 $27,00W 4100 5]. 30 3736.79 3672,79 $27.00W ~200 51 5 3799.32 3735,32 SZT,50W ~300 50 25 ~862,58 3798.58 S27,50W ~00 50 15 3926,40 3862.~0 S27.50W ~500 49 5~ 3990,56 3926,56 $27,00W ~600 49 55 4054,93 39g0,9~ $27,00W 4700 49 55 4119.31 4055,~1 SZ7.00W 4800 ~9 35 4183,90 ~119~90 4900 49 ~0 ~248.79 4184,79 $27,00W 453.91N 115,03 ~37,15 N 130,65 412.12 N 147,38 ~77.23 ~! 16t,29 335,73 N 174,78 290,36 N 189,74 240,95 N 207,48 187,15 N 228.67 128.81 N 252,54 66.91 N 278,50 2-58 N 306,47 63~95 S 337,15 132,04 S 370,35 200,78 S 405,00 269.86 S ~40,20 339,23 S 475,54 408.84 S 51].01 478,21 S 546,74 546.91 $ 582,51 615,20 $ 618,05 683.39 S 653,17 751,58 $ 687,92 819,76 $ 722,66 887.78 S 757,~1 955,57 $ 791.86 826.40 86t,08 895,96 930,83 5000 49 35 4313,67 4249,67 527,00W 1023.37 5100 50 0 4378-23 4314-23 $27,00W 10~t.42 5200 49 15 ~,443,01 4379,01 527~50W tl59,I5 5300 48 50 ~508-55 44~,55 S27,50W 1226,14 CLOSURES DI STANCE ANGLE D M $ 468,26 N 14 13 14 W 456,26 N 16 38 25 W 437.68 N 19 40 .39 W 410,27 N 23 9 I W 378,50 N 27 30 4 W 346.86 N 33 9' 50 W 317,97 N 40 43 51 W 295,50 N 50 42 6 W 283,50 N 62 58 ~0 W 286,42 N 76 Z9 27 W 306,4.8 N 89 30 59 W 343,16 S 79 15 31 W 393,19 $ 70 22 38 W 452,04 S 65 37 ~7 W 516,34 5 58 29 23 W 584,14 S 54 29 52 W 654,43 $ 5i 20 17 W 726,37 S 48 49 30 W 799,02 S 46 48 18 W 872,05 $ 45 7 57 w 1018,87 S 42 28 4 W 1092,82 $ 41 23 5i W 1166,91 $ 40 27 56 W 1241,03 $ 39 38 51 W 1315,38 S 38 55 19 w 1390,20 S 38 16 18 w 1465,05 $ ~7 4..2 7 W 1539,44 $ 37 12 15 w DOG LEG SEVERITY DEG/iOOFT 5,662 4.902 4-570 4,999 2.750 2.593 3.735 3.688 3,836 2.352 2.464 2,876 1,611 0,734 0-330 0.250 0.250 0,510 0,660 0.000 0.000 0.340 0.090 0,090 0 · 4 i 0 0.803 0,~10 SECTION DISTANCE -295.~ '265.44 -228,60 -186.45 -I40.2g -89,15 -32,48 29.44 95,50 164,68 237.20 312,39 388,92 466,03 543'45 775, 852.5~ 928,.8~ 100~,95 1081.06 t156,98 1232,66 t308.33 1384,29 1460,09 1535,27 RECORD OF SURVEY ALL CALCULATIONS PERFORMED ~Y I B b~ ELECTRONIC CO~,~PUTER TRUE ~4EAS, DRIFT VERTICAL DEPTH ANGLE DEPTH D SUB DR IFT SEA DIREC DEG, TOTAL COORDINATES CLOSURES DI STANCE ANGLE D M 5 5400 afl 30 4574.59 4510,59 527.00W 1292,89 S 965,21 5500 48 25 4640,90 4576.90 S27,00W 1359,59 S 999e20 5600 48 1,5 4707,37 4643.37 $27.00W 1426.16 S 1033.il 5700 47 45 4774,28 4710,28 $28.00w 1492.07 S 1067,43 5800 48 35 4840,97 4776,97 $28,00W 1557.86 $ 1102.41 5900 47 35 4907,77 4843,77 528,00W 1623,57 $ 1137,B5 6000 46 55 4975,64 4911,64 S28,50'~ 1688.27 S 1172,11 61oo 47 0 5043,88 4979,85 $28eSOW 1752.50 $ 1206,99 6200 46 4,5 5112,24 5048,24 S29,00W 1g16,49 S 1242,09 6300 47 0 5180,60 5116,60 529,00W 1880,33 5 1277,~8 6400 47 15 5248,6~ 518~,64 $~8,50W 1944,58 5 1312,72 6500 ~6 ~5 5316.84 5252,84 629,00W 2008~70 S 1347.90 6600 46 35 5385.46 532t,46 $29,50W 2072,16 5 1383,44 6700 46 30 5~54,24 5390~24 $29,50W 2135,34~ $ 1419,19 680(t ~6 ~5 5522,91 5458.'91 $30,00W 2198.45 $ 1455,26 6900 47 15 559'1e!1 5527ell $~O,OOW 2261,79 $ 1491,8~ 700(i) ~7 15 5658e99 5594,99 S30,OOW 2~25,38 $ 1528~5,4 7100 46 45 57Z7,t9 566~,19 S~O.50W 2B88,56 $ 1565~39 7~00 48 0 5794,,91 5730~91 $30,50W 2451,96 S 1602.73 7~00 ~8 15 ~861.66 5797,66 $31,00W 2515,95 5 1640.80 7400 48 15 59~8,~5 5864.25 SBI,OOW 2579,90 $ 1679.Z3 1613,45 $ 36 44 35 W 1687.27 5 36 18 47 W 1751.04 $ 35 55 11 W 1834,58 S 35 34 47 W 1908,47 S 35 17 5 W 1982.B1 $ 35 0 4~ W 2055,26 $ 34 46 15 W 2127.93 S 34 33 21 W 2200,56 S 34 21 49 W 2273,23 $ 34 11 30 W 2346,20 $ 34 1 19 W 24t9,0~ $ 33 51 46 W 2563,94 $ 33 36 31 W 2636,47 S B3 BO 8 W 2709,47 $ 3B 2~ 28 W 2782,78 $ BB 19 5 W 2929,31 $ 33 10 14 W 3003,70 $ 3~ 6 ~8 W 3078,26 $ ~3 3 ~ W 7500 48 15 5994.84 5930.84 $]l,O:OW 2643.85 5 171'7.65 w 3152,82 $ 33 0 39 W 7600 49 0 6060.94 5996.94 $31,OOW 2708.17 $ 1'756.30 W 7700 48 0 6127,~0 6063.~0 $31,00W 2772,37 $ 1794.87 w 7800 47 45 61,94~27 6130,27 SBI,OOW 2835,94 $ 18~3,07 w 7900 47 45 6261~51 6197,5I S31,OOW 2899,39 S 1871,20 W 8000 ~7 15 6329,07 6265,07 $30,50W 2962,75 $ 1908.89 W 81~0 ~ 0 6397,11 6B~3,11 $~0.50W 3025,89 $ 1946.09 W 82~0 47 5 6465,25 6401,25 530,50W 3088,96 $ 1983,23 w 3227,81 $ 32 57 51W 3302.6,6 $ 32 55 10 W 3376,79 $ 32 52 39 W 3450.77 $ 32 50 14 W 3524.45 S 32 ~+7 36 W 3597,65 S 32 44 48 W 3670.81 $ 3g 42 7 W DOG LEG SEVERITY DEG/1OOFT 0.441 0.070 0.180 0.742 0,840 1,000 0.712 0,070 0.365 0.250 0.368 0.566 0.309 0,090 0'365 0.500 0,000 0.566 1.250 0,374 0.000 0,000 0,750 !.000 0,250 0,0'00 0.568 0.250 0.090 SECTION DISTANCE 1609.98 1684,q 1758.73 1906.94 1981,07 2054.26 2127,13 2199,92 2272,7~ 23~5.81 2~18.75 2491.34 2563.79 2636.36 2709.40 2782,73 2855.7~ 2929-2 3003,70 3078~26 3152,82 3227.81 3302,66 3376.79 ~450~76 3524,43 3597,65 3670,77 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B ~ ELECTRONIC COMPUTER TRUE ~EAS. DRIFT VERTICAL DEPTH ANGLE DEPTH D ~ SUB DRIFT SEA DIREC DEG, TOTAL COORDINATES 8300 67 0 6533.39 6469.39 S30.50w 3152.02 S 2020.38 w 8400 47 55 6601.00 6537.00 $30.50'~': 3215,51S 2057.78 w 8500 48 0 6667.96 6603.96 $30.50~ 3279.50 $ 2095.47 W 8600 ~9 45 6733.72 6669,72 S30.50w 3344.41S 2133,70 W 8700 51 15 6797.33 6733.33 $30.50W 3410.89 S 2172.87 W 8800 52 55 6858.77 6794,77 S31.OOW 3478.69 $ 2213.20 W 8900 54 30 6917,95 6853.95 $30.50w 3547.96 $ 2254.42 W 9000 55 0 6975.66 6911,66 SBO.50W 3618.39 $ 2295.86 w 9100 55 15 7032.8~ 6968,8~ $30.50W 3689.02 $ 2337.50 w 9200 55 45 7059~a8 7025.A8 S~0.50w 3760.03 $ 2379.33 w 9300 55 55 71~5.63 7081,63 $.~0,50W 3831,52 S 2421.33 W g600 55 45 7201.78 7137,78 S30.50W 3902,62 S 2463.~3 w '9500 56 5 7257,82 7193.8Z S~O.50W 3973~99 S 2505,36 w .... 9600 55 55 731~.7'2 72~.9.72 S~O,50W ~045,~3 S 2547.~4 W O5 ~700 55 30 7~70, 7306,05 $30,50w ~116,62 S 2589.~8 w 9800 55 0 7.~Z7.05 7363,05 $~1.50w 4187.05 S 2631,70 W 9900 54 35 7484,70 7420,70 S32.00W 4256.53 $ 2~7fl.69 W ~'0000 55 15 7542.89 7~78,89 $3~.50W $325,69 S 2717.49 W i0100 53 45 7601.66 7537.66 $~2.50W ~394.29 S 2760.36 W 10200 53 35 7660,91 7596.9! 539.0'0w 4~62.05 S 2803.94 w 1'0300 5~ 15 7720.50 7656,50 $32.50W ~529.59 S 2847.38 W "~'0~00 52 ~5 77B0.~8 7716,68 $32,50W ~596,94 $ 2890e29 W ~0500 91 a5 7.841.90 7777.90 S~.50W G663.25 S 2933.~6 w ~0600 50 55 790~.37 78~0,37 &3~,OOW ~728.18 $ 2975.74 w 'i0700 50 15 79~7,86 7903.86 $~,OOW $792,23 $ 3019,94 W ~"~'800 ~9 45 8032.1~ 7968.1~ $34.00W ~855.7~ $ $062.78 w 10900 48 35 8097,52 8033.52 $35.00w ~918.1.0 $ 3105.6~ W 11000 a8 5 8163.99 8099,99 $35,00W ~979,~9 $ ~1~8.49 W 11100 47 45 8231,01 8167.0! $~5.00W 5040.09 S 3191.06 W C L 0 S U R E S DISTANCE ANGLE D M S 3743.95 S 32 BO 32 W 3817.58 S 32 37 2 W 3891.81S 32 34 37 W 3967.08 $ 32 32 15 W 4044.20 S 32 29 55 W 4123.06 S 32 27 54 W 420~,63 $ B2 25 56 W 4285.2~ S 32 23 ~3 W 4}67.24 S }2 21 35 W 4449.61 5 ~2 19 31W 4.615,02 $ 32 15 36 W ~697.81 $ 32 1~ 44 W 4780.69 S 32 11 5~ W ~S63,28 $ B2 10 12 W ~965,42 $ 32 9 2 W 5027.13 S 32 8 39 W 5108.46 $ ~2 8 16 W 5189.36 S 32 8 8 W 5269.9i $ 32 8 ~2 W 5350,21 $ 32 9 15 W 5~30,07 S 32 9 35 w 5509.13 $ ~2 10 17 W 558?.19 S 32 11 36 W 566~.41 $ 32 lB 5 w 57~0.98 S 32 1~ 30 W 5816,59 S 32 16 Iff W 5891~2t S 32 18 21 w 5965.35 ~ 32 20 2~ w DOG LEG SEVERITY DEG/IOOFT 0.090 0.930 0-070 1-750 1.500 1-710 1.605 0.500 0,250 0.500 0.180 0,180 0.340 0.160 0.430 0.837 0.528 0,~73 0.820 0.~61 0.~68 0.500 1-175 0,87~ 0.680 0,500 1.289 0.500 0,340 SECTION DISTANCE 3743-~~ 3B17, 3891.71 3966.96 40~.05 4122,88 ~2B5o02 ~366.98 4531.98 4780.23 4862,78 5026.58 5~88,78 5269.35 53~9.65 5508-57 5663-90 5740.~9 5816-13 5890-80 596~.97 RECORD OF SURVEY ALL CALC~JLATIONS PERFOR.~.!ED BY ! R ~¢ ELECTRONIC CO~PUTER TRUE YEAS. D~IF'F VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DIREC O ~ DEG, TOTAL COORDINATES 11200 46 45 8298.89 8234.89 $35.50W 5100.06 S 3233.44 11300 45 55 8~67.92 8~03,92 5~5~50W 5158,96 S ~275,45 11~00 4~ ~5 8438.21 8374,21 S~6.50W 5216,50 S 3~17,26 llSnO 4~ 0 8509,69 8~45,69 S~7.00W 5272,5B S 3359,10 11630 ~2 55 8582.27 8518.27 &37,50W 5~27~29 S 3400,74 11700 ~2 5 8655.98 8591.98 5}8,00W 5380,72 S 3~42.11 11800 41 15 87~0.68 8666,68 538.50w 5432.9~ S 3~83.27 llgO0 ~0 30 8806.29 8742,29 SMg,50w 5483~79 S ~52~,45 12000 3g 45 8882,76 8818,76 S~O,50W 55~,15 5 ~565,87 12100 39 25 8959,82 8895.82 $42.0ow 5981,07 5 ~607,89 12200 ~9 0 90~7,30 8973,~0 5~2.50w 5627.86 S ~650,40 12220 ~8 45 ~052,~7 8988,87 5~3,00W 56~7.08 S ~658,92 30TTO~¥~ HOLE CLOSURE 6720,45 FEET AT $ 32 59 12 W CLOSURES DISTANCE ANGLE D M S 6038.69 S 32 22 29 W 6110,93 S 32 24 ~2 W 618i.92 $ 32 27 10 W 6251,66 S 32 30 3 W 6320.21 $ 32 33 9 W 6387.51 S 32 36 27 W 6~53.67 S ~2 39 56 W 6518.72 S 32 43 44 W 6582,65 S 32 ~8 0 W 66~5,69 $ 32 52 50 W 6708.08 $ 32 58 7 W 6720.~5 S 32 59 12 W DOG LEG SEVERITY DEG/IOOFT 1.035 0.820 1.280 0.788 1,095 0,870 0,868 0.860 0.85~ 0.684 0,473 1.5~8 SECTION DISTANCE 6038.34 6110.~ 618i.6~ 6251,43 6~20,03 6387.37 6453o57 6518.65 6582,61 6708.O8 6720.45 ' F. INT_RPOLATED TRuE VERTICAL DEPTHS,, COORDINATES AND CLOSURES FOR GIVI:~N DEPTHS CODE TRUE MEASURED VERTICAL DEPTH DEPTH TOTAL COORDINATES CLOSURE DISTANCE ANGLE D ~ S SUB SEA TOP SAG RV 11471 TOP SHUB 11486 TOP ZONE B 11509 TOP ZONE C 11531 TOP SAD 11581 TOP ZONE 3 11780 'FOP ZONE 2 11841 TOP lB 12113 TOP lA 12173 · BASE SAD 12212 8~88.87 5256.57 S 3346,75 W 8499,63 5264,93 $ 3353.01 W 8516.17 5277.52 $ 3362,86 W 8532,05 5289.68 $ 3372.02 W 8568.38 5317.11 $ 3392.69 W 8715,67 5422,70 S 3474.90 W 8761,58 545fl,ll S 3499.93 W 8969,87 5587,20 $ 36!3,41 W 9016e3~ 5615.40 S 3638.81W 9046.63 5633,44 S 3655.47 W 6231.55 S 32 29 2 W 8~2~.87 6241.97 S 32 29 28 W 8~35.63 6257,B~ S 32 30 19 W 8452.17 627~.06 $ 32 30 58 W 8468.05 6307.30 S 32 32 26 W 850.4.38 6440,54 S 32 39 7 W 8651.67 6480.50 $ 32 41 18 W 8697,58 6653.84 S 32 53 3i W 8905,87 6691,31 S 32 56 36 W 8952~3~ 6715.52 $ 32 58 ~4 W 8982.63 MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. TRUE HEASURED VERTICAL SUB HD-TVD VERTICAL DEPTH DEPTH SEA DIFFERE;';CE CORRECTION TOTAL COORDINATES 164 164., 100 0 0 468, 264 264- 200 0 0 364 364, 300 0 0 467, 464 464, 400 0 0 466, 564 564, 500 0 C 465. 664 664. 600 0 0 465. 764 764. 700 0 0 464. 864 864. 800 0 0 465. 964 964. 900 0 0 465, 1064 1064. 1000 0 0 466. 1164 1164. 1100 0 0 466, 1264 1264. 1200 0 0 467. 1364 1364. 1300 0 0 466. 1464 1464, 1400 0 0 465. 1564 1564, 1500 0 0 464, 1664 1664, 1600 0 C 463, 1764 1764. 1700 0 0 462, 1864 1864. 1800 0 0 462. 1964 1964. 1900 0 0 461. 2064 2064 · 2000 0 0 462 2164 2164, 210'0 0 0 462. 2264 2264, 2200 0 0 4.63. 2364 2364. 2300 0 0 465. 2465 2464. 2400 0 0 458. 2567 2564. 2500 2 2 443, 2671 266~+, 2600 7 5 420, 2778 2764, 2700 14 7 385. 2.~89 2864. 2800 24 10 340. 3003 296~+, 2900 38 14 289. 3121 3064., 30OO 56 18 230. 3245 3164, 3100 81 25 161, 3378 3264, 3200 114 33 80. 3518 336.4. 3300 154 40 3668 3464. 3400 204 50 110. 3824 3564. 3500 260 56 217. 15 t.~ 100.21 03 N 100,18 4.5 t'.l 99 · 99 70 N 99,57 95 N 99.20 13 N 99.24 76 N 99,94 21 N 99,87 68 N 99-88 28 N 99,50 90 iii 98.34 08 N 96,86 66 hi 95,83 81 N 95,56 94 N 95 · 49 99 N 95,91 84 N 96,89 20 N 97.68 72 N 98-70 23 N 99,23 94 N 99.40 60 N 97,44 09 N 102.34 21 N !10,72 35 N 124,98 38 N 142.80 60 N 158,23 50 N 173.23 09 N 190.15 03 N 211.70 44 N 239,06 64 N 272.~9 23 ,5 311.75 34 $ 359,12 33 $ 413.43 DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, TRUE HEASURED VERTICAL SUB MD-TVD DEPTH DEPTH ,.5FA DIFFERENCE 3983 366~+, 3600 319 414.3 3764, 3700 379 4302 3864, 3800 438 4458 3964. 3900 494 46t4 4064. 4000 550 476c~ 4164. 4100 605 4923 4264, 4200 659 5078 4364. ~+300 713 5232 4464. 4400 768 5384 4564 · 4500 820 5535 4662~. 4600 871 5684 4762~. 4700 920 5834 4864, 4800 970 5983 4964- 4900 1019 6129 5064. 5000 1065 6275 5164. 5100 1111 6422 5264. 5200 1158 6569 5364e 5300 1205 671~ 5464. 5400 1250 6860 5564. 5500 1296 7007 566~+. 5600 1343 7154 576&. 5700 1390 7303 5864. 5800 1439 7453 5964. 5900 1489 7604 6064. 6000 1540 7755 6164. 6100 159t 7903 6264, 6200 1639 8051 6364. 6300 1687 8198 6464. 6400 17314 8345 6564~ 6500 1781 8494 6664. 6600 1830 8647 6764. 6'700 1883 8808 6864, 6800 1944 8979 6964, 6900 2015 9155 706~+. 7000 2090 VERTICAL CORRFCTION 59 6O 59 56 56 55 54 55 52 51 4~ 50 49 46 46 ~7 47 45 46 47 ~7 5O 51 51 48 47 47 71 75 TOTAL COORDINATES 327.42 S 469.53 438.78 S 526.27 548.29 S 583.21 654,87 $ 638,27 761.12 S 692,78 866.72 $ 746.59 971.16 S 799.80 1076.33 5 853.39 1180.73 S 906.95 1282.35 S 959.47 1382,76 $ 1011,00 1481,60 $ 1061.88 1580,32 $ 1114.~5 1677.38 $ 1165,96 177t,19 $ 1216.99 1864,35 $ 1268.62 1958.81 $ 1320,33 2052.45 $ 1372,16 214~,22 $ I424.1~ 2236.~9 $ 1477,16 2329.8~ S 1.531.11 2~22,81 $ 1585.16 2517.87 $ 16~1,95 2613,79 $ 1699,59 2710.75 $ 1757-85 2807,~t $ 1815.87 2901~29 $ 1872.34 2995,15 $ 1927.60 3088,01S 1981,95 3180.62 $ 2036~89 ~275,96 $ 2092,68 3375,63 S 2151.73 3484.17 $ 2216,~9 3603,80 S 2286,65 3728.22 $ w W W W W W W W W W W W W W W W W W W W W W W W MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEiFT OF SUB St.<A DEPTH. TRUE N-iEASURED VERTICAL SUB "~ ,-~D-T VD VERT I CAL DEPTH DEPTH SEA DIFFERE, CE CORR:,FCTION TOTAL COORDINATES 9~32 7164. 7100 2168 78 9511 7264, 7200 2247 79 9689 7365, 7300 2325 78 9864 7~6~, 7400 2~00 75 10036 7564e 7500 2~72 72 10205 7664e 7600 2541 69 10372 7764. 7700 2608 67 10535 7864, 7800 2671 10694 7964, 7900 2730 59 10849 806~. 8000 2785 55 11000 816~. 8100 2836 51 11149 826~. 8200 2885 ~9 1129~ 8364. 8300 2930 45 11436 846~ 8~00 2972 11575 8564, 8500 3011 39 11711 866~, 8600 3047 36 118~ 8764, 8700 3080 33 11975 8864e 8800 ~111 31 12105 8964, 8900 3141 30 3854.27 S 2434,98 W B981,89 S 2509,93 W 4109.12 4231,76 4350,69 4465.42 4578.39 ~686,21 ~788,36 ~979.29 51~5~78 52B6~91 5B1~.82 5521,22 5583,~2 258~.22 W 2658.90 W 2732e62 W 2806.13 W 287'7.88 W 29~8.37 W 3017~3~ W 3083,74 W 3148,~9 W 3211,71 W 3332.18 W 3390,22 W 3501,16 W 3555.17 W B610~02 W .INTERPOLATED ~'~EASURFD DEPTH 1000 2000 3000 4000 5000 6000 7000 8000 9000 10 000 11000 12000 VALUES ¥'OR EVEN TRUE VERTICAL DEPTH 999, 1999. 2961, 3674. 4B13, 4975, 5658. 6329. 6975, 7542. 8164. 8882, 1000 FEET OF MEASURED DEPTH. SUB SEA TOTAL COORDINATES 935, 465,86 ~.i 99,81 W 1935, 461.9~+ N 98,98 W 2897, 290.30 N 189.54 W 3610. 339,23 S 4?5°54 W 4249, 1023,37 S · 826,40 W ~911, 1688,41 S v 1171,82 W 5594, 2325,38 S '". 152~,54 W 6265. 2962.91 S '-.. 1908.61 W 6911. 3618.69 S~ 2295.25 W 7478. ~325,87 S,~ 2717,19 W 8100, ~979-29 S ~-~ 3148.~8 W 8818. 55~3.51 5 3565.&4 W HOR.IZONTAL .... VIEW SCALE i "= I000' ATLANTIC RICHFIELD CO. DRILL SITE 4'-6 ...... ......... RADI uS""OF GYROSCOPIC SURVEY-~ ...... : ..... - , -- ; ........ 2400 ~ i 2800 ..... . 3200. ............. -: 4O( 4800 6800 5200 5600 . .. .. 6400 . . ........................... : ...... ALL DEPTHS SHOWN ARE TVD. 7600 8OO0 8400 TVD: 9,055' TMD:12,220 2000- 2400- 2800 - 32OO VERTICAL SECTION I"= I000~ .... i ....... SCAL E ATLANTIC RICHFIELD CO.- DRILL SITE 4:-6 RADIUS oF' 1 440~ 48( ALL DEPTHS SHOWN ARE TVD - - 520( 68( . A PETROLANE ~PANY REPORT of SU~-SURF,~CE ~Ui~VEY Atlantic Rich£ield COMPANY D. S. 4-~ WELL NAME Prudhoe LOCATION TYPE OF SURVEY Multi-shot DATE SURVEY BY Shyam Talwar OFFICE Alaska ,, '__COMP L E T_! O N_R EP O.R_T .........~_ J _A.T L_A N T. I.C__ ~_I_ C H F_I.E_L._D__C.O.Mp A N Y MAGNET]:C MULT! SHOT SURVEY DECLI~NATION 31 DEGREES EAST RADIUS OF CURVATURE METHOD OF COMPUTAT!ONS --c o~ P u T E D'--F'OR E A-ST M' WH I PSTO R Ed'C~R'D--O-F--SO'R-9 E'V' A.L_L__C_ALC.ULAT/~'_ONS...PERFOR'PiED._.BY ..... ! B.. ~ ELECTRONIC COMPUTER . TR-U'E' DOG LEG --MEAS;"-'DR-!'FT-'9'ERTIC'~C ....... SUB .......... DR""I-FT ........... TOTAL'--'COORDiN'ATE~ .......... C-'-C-'-6-$-'0-'~'-~""~ ........... SEVERITY --DEPT'H--ANG'CE-- D~'T'H ..... SEA DIR'EC ~'i"'ST'ANCE ........~N~'L'E DE'G/'!~OFT-- ...... D M DEG. b -M ''$ ............... SECT'~N . '6'~S~ ,~'c1 ........ 2"~'2'~ 0 .... 0 ..... ~-~"7"e"O'O ....... 2063,00 ......... N60.'OOE ...... ~68".Z5 N ............... ~00'-~-21 .... W .......... ~7fl-"75 ..... N ..... I2 ..... ~ .... 5 .... 2'~2'0 ....... 2 ....... 0 .... 2~"19'-"98 2155.98 N60".OOE ~68"96 ....... N ......... 9'8.'80--W .......... 479.25 .... N-I'I ...... 53 .... 5 l'-'W 2''~-0'7 ...... 5 ...... 50 ...... 24'0~-"-77 ..... 23a2,77 S46.00W 468,56 N !03.89 W ~79,9~ N 12 30 6'W 5"'702 -335.10 ~25'0'0--Yi 0 ..... 2'~-98-'-7'~ ....... 243~J'7~ .........S~3"'OOW ............ 458',85 .... N ........... 113"4~ W ~72"66 .... N ...... 1'5-53 .......... 8 w ....... 26~"-19 ..... o ........ 26'77'~99 ...... 36'~s'.99 ...... s'Z6';oow .............. ~ 9,63 N ............ ~'~'Z.'6Z-W- ..... ~'~S. Z'~ N ...... Z'8 .... ~6 ~ .............. S'.'9b"6 -Z"~Z-'-9'S ~77 9" '23 ..... 0 .... 2 76~""79 ........ 27 O0,79 ..... S ~ 7'"'00 W ........... 388'. 66"-" N .......... 15 ~' ~'8 Z-W ..... ~!8 "3 6 ...... N '-2'1--~ ~ ..... ..... ~ 965 ....... 29 O-~2931-,-3S--Z'867'"-~'~-"S'i'e"'5'O~ ........... S0'9'.9Z N ............ ~ 79', 87-W ...... 358'"S ~'"N'--30 .....7 "5"Z "w ................. Z'*"~'-O'~ ...... ~os~ ..... s z .... ~'s ....... so'~'z-,'~-'~ .... z'9~'.'~'z .......... sz'o'Oow .......... z 6'5'"os ...... N ............. ~'~ 5-'5-4-W- ....... SZg';S'B N'-"36 .... Z~ ...... ~ .... ~ .............. Z'"'9-59 -f~'~"'%'~ 3152 35 ~5 3089.73 3025.73 SZZ.00W--2Z'~'-8'Z--N .... 2'1'~-~-0'~ W 3'd~'~"~'9-N-~'~--37 55 W ~.363 ......... ~-~'6"'-3~ ~o---~'!'6'~'."5'9 ~ ~'0'o-'.-5'9 ....... sz'z"o'ow .............. ~'6~" ~'z .... ~ ........ zss-.-ss-w .......... za6"9'z N'-55 ..... 6 .... S .................. 3'/~'0~ -'{ ~-C .... 3~4"0"'-4'2 ..... 0 ........ '3'2'36'.-2'3 ...... 3'~72";23 .......... 522".-50W' ..... 10'7.8Z ..... N ......... 25B"'~-38 ..... W- ........... 2"79""98 ....... N'-67 ..... 20 .... 57"W ................ 3"'5'5'~ 5 ............ 35-25-4~ %5--'%-3'70%"~'0~3-306','00 325-~'O0W ................8""98 .... S ....... 3~0""-'~0 W 310-'"'Z'3 ...... 5 88 ...... 20 ..... ........ 3-6'~'7-'"48 50-~3%'3'2-r6'8--336'8""68 ........ 5~-6" 50W ......... ~'9-."62 ..... $ ........ 33'9-*-3'5 w 3-~6"'~ 1 ..... 5-'78 24 ..... ................ '4'""0"~0 2 --3T~'~--5'0 0 3~93.~B. 3-4-2r9'~'~'8~'S2'~;0-0w ........... 'i'3-2-'~9~~3'70.59 W 393.'7'2-'S'-70 Z'5 ........ 3~0'3 ..... 50'--~0 .... 3"5'5kV5'~ '3'~'88';'5'~-",SZ-'6'~-5'0'W ............. ~-~ 7 ;~7 ..... s ....... ~'0-Z-'-2"'~w4~7"9~ .... s" 63 ..... 53 ....... .......... ~'8'9'~ ..... 5! ..... 0 .... 3"6'~-i-,~-7 .... 3'5'~ 7';ZT---SZ'6;-'5'0'W ......... 2'6'Z"'"70-5" ~--~-4V~"~--W ......... ~0-7'~ ). ~" s"-'5 s ..... 56 ..... 4-"W ............. 0""~'5'5 ~5'S'."~' 3987 51--0 3668.5~ 3'6'0'~""5'4~'2'6"~5'0W ......... ~'2%-"~"~5~'~-6'~98 W g6"~';l"Z-'s-"'55 ..... 6'-~'3-'~J--0'~'0b'0 ..... 'a'079 5'~-~3'7-Z'-~-,-2'2-~'6'62';'22 ...... S2-6-;50W .... 3'8'9'*'!'3 s---~97",'9'6 w 6'3-~".9 7 .... 5 5 ~ .... 59 .... 37'-'W ........... 0'23-70 ................. 5'9'8.'~': ....... a'i'73 .... 5"~ 5 ~7-85-"-i"~--372 l"e'l'l s27'~0'0w ...... 4'54 ~ 5'5-5--'5-3'0-;'9'4-W~-6 9'8''" 9 ~-"-s" ~ 9 25 5 4267 50 55 38a4.25 3780.25 5ZT.50w--519.51 s 564~39 w--76'7'"'0'9i'5"-47 22 ..... RECORD OF SURVEY -~-L-L~C-ALC-U~-A-T]-O~i'$-'p~RFORMED By I B ~' 'ECE'cT~'O-~'ic ...... COMPUT'ER ~EAS. DRIFT VERTICAL SUB DRIFT .... DEPTH-'"ANGLE DEPTH ..............SEA ......... DIREC ........ D'-M ............. DEG, DOG LEG TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION .................. --DISTANCE -- ~ ANGLE ........... DEG/IOOFT DIS'TANC D ~, ' S .................... ~359 ~+546 ~'639 ..... 50'-'45 4079"70 ......... ~0!5.70 .... S27-'00W ..... 775-.'40-"$ ......... 696."5¢''w .......... ~'042'.32 S 41 55 59 W 0.44! ----4'7~'!--50--!5-4'1'~'8-.-22 ......... 4074,'2'2 ....... s2T.-O'OW---~'8-.'6'5--S ...... 7'28.77 W ..... 11'11""0'6 ....... S--4-0 ..... 59 23'--"w ........ 0,5,.. &~23 50 0--4197,20--4133.20--S26.00W 901,84 5--760.27 W--117~'"'-5'5'-'S--~'0 .... 7--53--W ~9~'----~9--%~ ........ gZ''57--''~'~ .... ~9~'1~ ........ SZT'''0'0w ...... 9'65','4B--$ ........... 792',00'-W ......... 1-2~8,77--$""39--Z'~ ~5"-'W ............... 0.682 s o ~ o--~ ~ o' ~-s'~"~-.~ ...... ~ z.~4?js'~TZ'-2s z'!'?W ..... ~-?zjs'??s--_--Zis z_!.ii~.~"Zw-_~i'sTl~s.-j.ls'i~Zsls 50 30 3902.50 3838;50 ..... S27.00W 582.82 $-- .......5~)-G-~'9--9--~ ....... §3~-;-3'2 .... S-"-~-5'"g-~ ..... i'7 W 0.568 81~.62 51 15--39-6!-"82 ...... 3897,82 ..... S2'~,"0"0W ..... 6'4-~;'50-5--630'-,'66-W 90'3"88 5"--4'4'-"1~--'43'--w1-.b'27 8'87"'-'~-8 50 20 ~020.60 3956.60 527.00W 711.42 5 663-"9~ W 973.11 5 43 1 21 W 1.168 9~i 8~ 1030,27 1100.84 !170.96 1241.58 ...... 51'02 ..... 5'0--~.-'0 ..... z~3'TT"98 4313.98 528,00W--1090,89 S 857.28 W 1387.4z+ $ 38 9 43 W !.3!2 1382.27 5~ 95'""~-'~-5 ...... ~'3 s,"~ z ~7~, t z.' sz 6"5ow ........ i~ 5-3','9'~ ..... s .............. ssg' 7~-'w .......... ~'4'57, ~ 5 .... s"-37 ..... 38 ..... z'-w ........... ~. s 55 ...................... ..... 5289--'~9 0---~-9'9'~-6-~ ....... 4~ 35,'6~ ......... S 27' 0'0W 12 lj'.'~'3--5 ......... 9 Z 1'~'75 ..... ~/--' -1527"' 01 S'-'-37 ..... 7'-~-9'-W ................... 0",'~ 03 ~ 5 Z'3"~'~'4 5383 ~8 ~0--~561.51 A497,5~ 527,00W--1280,~8 5--953.88 W 1596.72 S 36 41 1 W 0"'35! ....... 5~'77'"'~9 ..... 0 ~'623"'3'8 ..... 4559.38 527'00W ....... 13~'3"53 ..... S .................... 986.01 .......W ........ 1'66'6.52 '5' '36 ...... 16""'2'8'"'W ............... 0.351 ..................... 1'66'~. 5570'""~8-35--~'6'8~-~6'5 .... ~'620.65 5~7,00W 1~05,87 5 !017"77 W .... ~735"61 5"35 ..... 5.4 ..... 8"-'W ................ 0'.'~1 ~566'3-'~"8 .... 0~'~"6",-5-2~ ~'682'.-5'~528'~-00W~'-~-7'~'4"~--5 .... ~'0'~'9%"83~~-80'4,'33 5--35-'3'~'-~'8 W 0".~'6'9 ...................... 5756 ~8 0 ~808e75 ~7~75 528~50W ~528~3~ 5 I082~5~ W 187~89 5 35 18 37 W 0~00 197!~6~ ...... 5850""~e ....... 0 ..... ~'8'7'~'~"6'5' ~807-65 ....... szT,sow ......... ~590,0z ..... $ .......... ;~5','3~-'-w ........ ~'9~'z,20 s"35 ........ z ..... 53"-'w ........... 0,79~ ................... 6037 ~7 ...... 0 ~997,87 ~9'33e87 ...... 6130-'46 .... 55 ....... 506i"'34- ...... 4997.34 528,50W ....... !772,1'4'-'-'S ........ 5 34 21 27 W 0.579 2!46.2~ ..... 63~7.,__~7 ........ 0 ....... 5!88.,.9~ ..... 5_~.2.~,9~ ........... 529.,.00W ...... 189!.8~ S ~277,5~ W 2282.8~..5...3~ ......... ~ ...... ~7....W ................. O..000 .................... 2282,5~ ~o~ ~ so ~z~.9~ ~4A!.A~__s2.%.p_ow ~?~.o,.?7-".S'/"-'~?~.~?],"~-'~W----~Z'.s??...~_~ .... s_ss ~%_~..L.N_ o.~s 6503 A6 30 53~6,65 5252,65 529.00W 20~0,~ 5 ~343.06 W 2~7.~ S 33 ~ 56 W 0'"0'~'0 ~s~-"--~'~ .... ~'s ..... s-S-~'0-'-'f$ .... s's~'6'"'~'s ......... ss'~"~ow ..... 2oSs,2zs ~s7~,~o~' -2~s"~ s ss37'-'~'2 ..... w ................. o"'39's ............ 6779 ~6 ~0 5~07.02 5~3.02 $30~50W 2~83.89 S ~A~.?2 W 26~6.86 $ 33 25 ~2 W 0.85~ 26~6.Bz .......... ~',~= ~? ?-'_~..= oZ~'~' ~.=~.~.~..= zlT> ~'o''?~;~.~''~''''~'~$ so',~owT-.?'~ ~'~'"= ~---'s .... r~-v'g---~-= ..... ~ ............ = ~"~ ~. ~ ~ ~ .... z = .... 2 z-w ............... ~,'~ ~ ='-= ............. ~?~_~._~_~.0__~.~.~.~?_0_~ ...... ~..~7.0_,_0~ ..... s_Z~.~.ow~Ao_~'~z.~-'_S~"~---'~.~_l?'~l'-W ............. 2~ s2,'~'z 's'ss .... ~ ...... 2 ~"-w ..... F .......... 0-.'92~--: ............ ~ ECO R D_._O F_. S U R.V E Y A..L__L___~_AL~_UL_A_"r_I_ONS__p_.ERFORMED_.BY' ..... I .... B_:M.__E_L.EC_TRON! C CO,MPUTER TRUE .......................................................................................................... FJ-~' G --'-~:E~~ ,EAS, DRIFT VERYI"CAL SUB DRIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION ..... DEPTH'"'ANGLE ..... DEPTH .............. SEA ............ D IREC ~ i S'T'A~'CE ......... ....... ~NG'LE ........... ............ D E O / IO-OF'~~_O_ I.S~A N.C ............. D M .......... DE'G. D~_M ........... 7!a9 ~7 10 5759.74 5695.7a S3!,OOW 2~!7,18 S 1578,12 W 2886,7~ S 33 8 22 W 0.346 2885(' 73 --7242 48 0--5822.A'7 5-758,+~7 .... S31'"OOW ~-247'~',-03--S---f"6~3-$~S--W 2955.'35-"S-53 ...... 5 .... 23 W 0,892--29 ....... 7335 -48 0 588~"-70 ..... 5820'70 .......S31'"50W ..... 2535"12 S ...... 1699."3~ ....W ....... 30'2F+.63 .... 5-'3'3 ...... 2 ..... 52'-'W ......... 7; ..... 0.~00 ....... W 0.;49 3091.9! ...... 7426---47-5~5945,68 588!"68 ....... S3I-"'O-OW ..... 2592,86 .... S ......... ~6'84'-38 ..... W ............... 309!.93 .... S'-33 ...... 0 ...... ~1 ................. ~ ....... ,6'i3'-"a 7~0 6071'"! 1 ............ 6 O07 "! Z ....... S 3'I"';00~---27 l'l. ,g'"'S---'lj 5'6-"3'3'-W ......... 323 0 '57-5-3'2 .... 55 .... 5'9'--W .......... 0-.-,'56 ............... 7799 ~7 20 -6-~9~-~7-6~-1'3'2-'.-76 ..... S"3-fr5Ow 2828,83 S--1827.22 W 3357,6~ S 32 5! 3~ W 0.338 3367.5[ ...... 7'8'9~-'47 ..... ~5 ..... 625 9'.-~6 ........ 619 5.16 .... 53 I'"'o'oW ........ 28'86,-6'3--5 ....f8-6-2",-29 .... W- ......... 3'¢35'-22 .... 5-3'2-4-9 4'O'-W .................. 0.-309 .......... 798'6'-4'7--" 0 632 ~ ,7 9 ......... 6259'79 .......S 3 l-.-O0 W ...... 29 46',30'-% .....f89-8'-.' 1'5 ..... W ........ 350'4.8'I ...... S-32 47 29-w ................ O'.'2"fi~ ........ --8078 47 0--63"~'3-a----'6 32'2' ''5'4 .... 2 ~ 5 2 8 W 0 · 000 --8 1 72---4"~ ' 45~64'5'0"~B'0 ...... 6 ~ 86',80 S 3 I'"O'OW ......... 306'2 .-79""-S ......... f968";'16'--W ............. 36~ 0,64'-"S .... 32 4'3 ..... 2'-8'""W 0'"2-56 ................ ...... 8'2"66--66--55---6515%"I~ 645'I-i-I 0 ........ S3 l-,-O-'OW---31'2'1'-i"'56-5---2'00'3";'~'5 .... W ............ 37Q'9"-1'7-S-32 .....~'l ...... 3~-'W ............. ~"!91 8359 47 3"~65~B";~'7--55'i~'.'~'7--$'3-l'~O'OW 31"8'0"-0'7-~--2'0'3-8-~6'0 W 3'7'77";'4'0--5'-'3'2--3'¢-4-3"~ ...... 0-j6-1'3 ....... 8452-%7 .... 55 .... 6"6A"0-;8'~ .... 6576 .~84 ....... $31'"'0'0W 3'~9-~'0~+--S ....2'074~;'0~-W ........... 38'"~"6'.-1'7"~"S~-32 .... 37 ...... 56--W .................... ¢"v¢"62 917.12 S .32 36 10 W 0 863 3915 ...... 85 '7-4'g-A'5 ...... 6-6'39'-98 .......... s31'."00w .......... 329-9,-88 .... s ......... 21-z'o-'-59'-w .............. 3 ' ................ , ..... .8 ....... 8735 ..... 5'1-'4'0---$8 2~"5 7 ......... 6760.57 ............ 530'.-50W .......... 3~23'-65 ..... S ......... 2"['SZ;"."5¢'-W ......... %'0'6'~' 25"-5 '-'32 ..... 32 ...... 29 .... w ................. I'-.'82'6 ...... ........ 8828 ..... 5 ~-" 0-'68'8 Z-,-4"O .... 681'7 .'40 .......... S'3' 0 ."50 w ....... 34 '8-7 .-0'8 ..... $ ........ 2'22' 1-~'96'---%,~ ..... ~' ~3 'a'" 8' 3 s "'32 3'0 ...... 1'8-w ............. !"';~fio- ...... 8922 g4 30 6936,98--5872,98 S3'I-/O'O'W--3'5'5~'";2~'~"2'EO-Ff~W- ......... ~-¢";E0'-S-3-2'-28 25 w 1,63~ 4210.2~ ..... 901-6 ..... 54-45 .... 69'9!""-4-0 .... 6927,'40 .... =S3~I-"O'OW ........... 3'6'17'92 .... $ .......... 2'3'00-'-1-9 %¢ ....4287.'22 ..... S-32 ..... 28 ..... 50'"-W .................. d'"'2'66 ..... 9'109-5 ¢--15---i'0'~';74 .... 6'98'0";7'~ ....... S3'I-',"O'OW .... 3'6'8-3"22 ..... S ...... 233-9';~'3--W--'--4'~6'3","3'8 ...... 5'-32 ..... 25 ...... l'9"'-W ........... 0-;538 ................ ~"2-0'3--55--3'0--7'09'8-;-i'5'--'7~3'~-'-~5-~'3-1'"0'0W .... 3'74"9-J5'2-S ....2'3'7¢i-2"~' ~%-40-*'7'0--S"-3'2 ..... 23 ..... 5'O""'-W .... ~"$2~ 6 4~ 0 , 2' 9297 55--3'5---715'"1-';33 7087*33 .......... S31"'.'OOW ...... 3'815.96 ....... S ....... 2'~"19-,-19'-W ....... 4-5-18"'19 ...... 5"32 22 2~ W 0,090 ---93'90 ...... 55--3'0-~'2"03"'*'~5 .... 713'9"9'5 .....S3-'1'";0'0"W---3'8"8'1'"'69 .... S .......... 2'-4-~8-e-6"8-'V~' ~'5'9-~',"8'5-S'-32 ..... 21 ...... 1 ...... W ............. 0',-0~'? 948& 55 55--7256,90 '7'~92,90 S'3-~'-5~'W' ~'9-~'~-*'09~'2'~'9'8.97 W 6~-7'2""'5-~ .... S-"'3'2 ...... 19 55 W ~¢85 95 77 5'~'"'0 ~ '7-'3'0'8"'-95 ...... 72 ;'95 ...... S 3"2-*-50W---%-0'~'3 .'~'5-S ........... 2'5~'9~-;''8'[-~ ~7-~-9'.-57 s '"3 2 ...... ~9"-'~"6-W .......o-,-7'a~ ' .....%7-a-9'."0- ~-9672 .... 55--20 73'5~"";'5'3 .... 7298-*53 ..... S~2-*'5'0W' .... ~07'9"~'!-5 ........ 25'8-1-,-9~'--w-~4'8"28'.'02 's .... 32 ........ 19 .... ~,'6'-w''-~ ........ 0""6-9-5 ............... RECORD OF SURVEY -A-~[.---C~-(.-~(jt~-AT-I-O-N-5-'P-~R'FORMED 'BY- -I' B /v ELECTRO'N-i'C-'C-OMPUTER ....................................... YR-O-E- ................................................................... D.o.a __L_E a NEA$, DRIFT VER-T'I'CAL SUB DRIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION DEPTH` 'AN'~,-L~E ........ DE-PTH ............. SEA ............. D I~,E-C .................... D'i'STANCE .... ANGL'E-- .... DEG/1-o-O-FY .... D I~'S-T-AN'C''~ D M -DEG, ................................................................... D ~ $ ........ .... 9953 5~. 0 7524.80 7&60,80 .... S33',-0'0W ....4'2'72"-!'9--S ..... 2706~,"~52-..'W 5-0'57',"4'I ..... S'~'~.32--2! 21 W ........ 0._5._38 .......... .... ~'0 0"~'5-5-3~-5-~-5-7~-'-0'& .....7 5 ! 5,0~ S 3 3',-00W ..... ~ 3 3 ~ · 51 -'S ..... 2 74 7,0¢ W ....... 5 ! 31,7 2 S 3 2" 21 ~ 5 w .............. 0 ,.27.2 ...... ~.1.3. I_,_1_6. '--1-01'38--5-3-2~-~'6'3-~-,'30 -757'0,30 ......... S3-3,-00W ......... 4-3-97"2~'--5 ........ 2787,83-'--:d .......... 52'0'6',~2 S 32-'22 2B W 0,~! 5205,96 ~'b-23'2--5'B-i-5 76-9b-*%'8 7 928', 4-8- 53'3'YO'oW~"4"(O-,-¢'5-S---282'¢."8"s--w .... 52-8':-,'.B'7-s- ~ 2--2 ~ ...... o'-w .......... 0".'0-9% -~: 03-25-53 O--~-7'~'6 ,-29 ...... 768'2,29 ........ s 3 B "5-OW .......... ~ 522 "66--S .......... 2 869,67 w ........... 5356,26-.~-: s~.~.~3 2'? 3 ...... ......................................... ~ 3 w ......... 0 .'¢ 3-6 ............. 5'35 -- ~'0~ ~'7-- 52-~' 0 ...... 7-8°~-,V'7 ......... 7737.,~97_-' '-S B.3,?:OW~%'~5.[ ~,:~I.Zs::Z_2909_,_8.2_w~_5_~29.,_~.8 .._s_32 .... 24 _25__w ........... 0.~._6.~2 .......... :0510 5~ ~0 7859~:2 7795,12 SBB,50w 4645,26 S 2950,05 w ............. 5502,8~_.5.__32 ..... 25 ......... 5 w 0.952 .................... ~0.2,_32. .... I06'0~ .... 5! ...... 0 .......... 79~'7~'2 ..... 785B~22 ...... S34,'00w ........ ~705,6¢'-"S ......2990,39 w 5575.~ s B2 26 8 w 0,790 557~,93 : 079 l-~ ~0~'~7-,~'5 7973,75 s3 ,,50w ~82~,72 s ..... i-0"8'8~-~8'-B5 ...... 8'098',-80 ....8'034,80 ..... S35,00W .......... 4882,~6 s 3l!~,8~ w 5789,7~ S B2 ~0 ~3 w 0.86l 5789,B0 --':"oe~'%e ...... 0 .... 8':'~-8',b'2 ....... 8 oe~. 02 ......... ss 5.'~oW ........ 4'e':S' ~'2 .... s .......... 3: :0. :e'--W ......... ~'~e. :0 s --32 .... 32 ---~--"w ................ o. 712 ................ ~f:O-i'3~ 7--~-o -8"~'8'4'Z8'2 ...... 8 ~ 20'"'82---SB 5';50w--%9'6'0'"'79--~ ..... 3I~'7','~3%i .... 5'8'85','7 5 ..... s-"32'~3-2'8-W~°",'k''00 5885 ,~'7' --I1089--47-B0 ...... 823'6",~'0 ........ 8:72~00 ..... sBeloow .......5006,39--s .......3200,25"--w ............... 59~!,85 s 32 35 1~ w 0.573 __.1.1~00._..'+~_75 ........ _8.~.5.0_,_8.5_ 8_38.~..,.85 ....... S3.8_,.50W ....... 5.: 88,8~.....S ........ 333.:,..60 .... W ............ 6166,.~ 3 S...._32 ...... ~2_..:.:._.W .................. :._,_2~ 0 ............. 11500 ~4 0 8522,33 8&58.33 S37,00W 524~.88 S 3373.4~ W 6236.10 S 32 ~4 ~5 W 0.788 623.~.89 !1600 ~2 55 8594,91 8530.91 S37.50W 5299.6~ S 3~15.08 W 630~.68 5 3~ 47 51 W 1.095 --11700-42 '5-~8'-6"6'8%"6'~-'8'60~',62 S38-,00W ......... 5393,06""-"~ ...... 3A56,~5 W 6372,00 S 32 51 0 W 0.870 6371,87 .___ ::'~ 8'.0 0'-"_~.! '~'15:' -~8'3713":':-_32'%18167.9'313. 2'%::$'.3.8:?''.5': 0.W:--- 51~.0 53.' 2~-ZS'"'_-'"'_314-9~'_:'16'i W -- 5..~"138A 1_9 ,'_S '_':. 32 ::'_ 5~.:.:-2 01'-'_W-'_72 .... :: 0'318'~': 8:::'1%-' ': 6.6137 it! 0 ~ 19_00_.~030 _8 .8.$. 8 .,.9. ~ ....... 83.5 ~.,..93 ..... s3.%,.5.0~ ...... 5 ~, 5 ~ ,.: 3 ..... s ....... 3.53.8..~_..~.¢ ..... ~.50.3,2.6_. s..... 32 ...... 5..s ......... :.._W ................. 0_,_8.60 .................. 6.5 o.%,.20 ..... 12000__.39_A5 ....... 8.8.~%,.~0 ........ 883:, 40 ........ s~o, 5 o~ .... 5.5.05,5o .... s .......... 3 580_. 2_.:__w ........ 6..557.2: _.s....33 ........ z ........ ~... ~ .............. 0-.8.~ ............ 6.~ ALL RECORD OF SURVEY C_A. LC_UL A.T_I. ONS.__pER FORN1 ED __.BY_._~ .... B._ ~ ..... E L E CTRO.N.I C_._C~.O~,PU.T E R ..... TRUE MEA$, DRIFT VERTICAL SUB DEDTH ANGLE DEPTH SEA D ~ DRIFT TOTAL COORDINATES C L 0 S U R E S SEVERITY SECTION DIREC DISTANCE ANGLE DEG/iOOFT DISTANCE DEG. D R! S 12220 78 ~5 9065,51 9001.5! S43.00W 5609,43 S 3673,26 W 5705.11 S 33 13 5 '~ ,~..,.5.o.,,.__ 6705.1~ ~OTTOM HOLE CLOSURE 6705.11 FEET AT S 33 13 5 W ............. I NTERPOkA~ED__T_RUE_.VERT. ICAL .... DEPTHS, ....... COORDI NATES...AND_CL_OS. URES.._.FOR...G I VEN ..DE.pTH5 ......................... TRUE CODE MEASURED VERTICAL TOTAL COORDINATES C L 0 S U R E SUB --NAME ............ DEPTH DEPTH ............................... D I S TA-~c'~ ........ A~G L~-E ................ -SEA D M S ...._T.OP__~AG__~_V___],~?~ . 8 5 0 ! TOP 5HUB 11486 8512 TOP ZONE B 11509 8528 TOP ZONE C 11531 8544 TOP SAD 11581 8581 __TOP_ZONe_3 ...... 11.780 ............. 8728 TOg ZONE 2 118~1 8774 __.TOP_IR ..................12113 ................. 8982 ...... TOP ..... lA ............... 123.73 ....... 9028 ..... BASE.SAD ............122~2 ..... ,27 5237,28 5 3367,35 W 6226,41 5 32 .81 5249,87 S 3377e20 W 6242.32 $ 32 45 !0 W 8464,81 ,69 5262,03 ..... S ............ 3386,36 W 62'57,51 S 32'45 47 W 8480,69 ,02 5289.46 S 3407,03 W 6291,76 S 32 47 !0 W 8517,02 ,31 ......... 5.395.,04__..S ............ 3489,24___W .......... 6.~25.,_05 .......$ ,22 ..........5426.,45 S 35.14,27 W__ 6465,02 ........ S 32 .... 55 .... 40 W ......... 87.!0,22 ,51 .............. 55.59,5~.~5 ......... 3627,75 .... W ................ 6638.,.46 .... S._33 7 ..... 31 .... W ....8918,51 ~98 5587,75 S 3653,15 W ........ 6.675.._~96 ......$ 33 !0 32 W 8964,98 ,27 5.6C5,79 .... S ........... 3669,8!._W .......... 6~.00,_18 ...... 5_33 !2 ..... 3.8 ..... W .......... 8995.,2.7 .-MEASURED.,.DECTM-AND-OTH~.R.-DATA--FOR EVERY .... EVEN .... i00 FEET-.-.OF..SUB ~SEA DEPTH, MEASURED DEPTH TRUE VERTICAL ,SUB MD=TVD VERTICAL DEP TH --SEA--D'-I FFER ENCE ...... CORRECT ! ON T O_T__AL ...... CC) OR.D,IN A_T_E_S 16A 264 354 ~ .......................... ....................... 86.4 1064 1164 1264 1_3_64 1664 164~ 100 0 0 468.!5 N 100.2! W 264. 200 0 0 468.15 N I00.21 W 364. 300 0 0 468.15 N 100.21 W 464. 400 0 0 468.15 N !00.21 W 564. 500 0 0 ~68.15 N I00.21 W 664. 600 0 0 468.15 N 100.21 W 7.64.e .... 700 ........... 0 0 46.8_,!5 N 100,21 ..... W 86~, .......... 800 ........... 0 0 ~68.~,~!5_.N .............. !00.21. W ~ . 964. 900 0 0 468.15 N 100.21 W 1064e lO00 0 0 46B.15 N lOOe2! W 1164. 1100 0 0 468.15 N 100.21W 1264. 1200 0 0 468.15 N 100.21 W 1364m 1300 0 0 468.15 N 100.21 W ' 1464m ......... !aO0 0 0 46.~,~.!.5..N ................ iO0.,21~..W 1564. 1500 0 0 468,15 N 100.21 W 1664, ............ 1600 .................. 0 0 46'8.-!5'N ........... 1'00'21 .... W 1764, 1700 0 0 .468.15 N 100.21 W 186.4 !86&, ..........1800 0 0 468-!5....N ............. 100,21 W 1964 1964. 1900 0 0 46~.15 N lO0"21 W 206z+ 2064. 2000 0 0 468.15 N 100.2! W 2164 ............................... 2164, ............. 2100 ............ 0 0 468e27 N 99'98 'W 226~ 226~, 2200 0 0 ~68,85 N 97,62 2'3'6% ~3"6g, 2 ~ Oo . o o ~ ~ o. o s N ~ o o. ~ 7 w 2665 2~6¢, 2400 0 0 ¢6~.28 N 109.18 W ~ - 256_7 __2564, 2500 2 2 44.7.&.91_N .............123., 2.4.....~W 2671 ............................. 2664,, .........2600 .......................... 7_; 5 423789_N ...............!40,38 W 2778 276~, 2700 ~, 7 389.03 N 154,70 W 2889 2"86fi" .......... 2800 ...................... 24 I0 3~','0'5'-N 168. 65 W 3002 2964, 2900 38 14 -- 2"9-2"'~'6'~N .............. 3121 ........................ 3'0'64" ............ 3000 56 18 ................................ 2'33"38 ..... N 207.~9 33%7 ~¢264'e--320'0 113 ' 3"2 8'~'-77 ....N ......... 25'7','8"6--W 3516 336~, 3300 !52 39 5",-20 S ......... 307,~'~ .....W .......................... 366 5 3~'64" 3400 ........ 200 ................................. ~8 102"'2 4'-'-5 ............. 355 "2'6--W __i.M NE A S U R ~E D____D E'P__7.H__A ND__O TI' H E R../.DA T.A .__f 0 R EvE R Y ..... E.V E N ..... ! 00 .... F E E T__O F--''S U B.__S E A ....... D.E P__T H ' MEASURED D.EP_T_H TRUE VERT ! CAt. SUB MD-TVD VERT I CAL · D. EP T H --S E A D ! F F E'R-E'N C E -- C O'R RE-'~¢T~I 0 N__ T.OT_A.L .... CO OR.D_I_ 397.9 ... 3664_, ........... 3600 4139 3764, 3700 4298 386/+, 3800 41+5-6 39'64", ....... 3900 ..... 46!% 4o6'~-. 4'000 4771 4164, 4100 /+926 426/+ e 4200 5080 4364, /+300 3!5 375 6O 59 540,93 $ 575,30 492 58 649.57 S 631.76 550 5'8 758,16 $ 687,76 607 57 866,09 $ 742,61 662 55 972,28 $ 795,45 716 54 1076,13 S .849e!3 434 3._1~9_,.6.8._5 ..... 462 431.07 $ 518,70 W 5234 4464, 4400 770 54 ' 1180,44 S 902,80 5387 4564, 4500 8'2'2 52 1283,00 $ 955,16 5538 ................................ 46646 4600 .......... 874 .................................. 52 1384.,47__.$ ......... 1006,86 ............................. 5689 ............................ 4764. ........... 4700 .......... 925 ................................. 51 !484,52_.S 583_8 4864, 4800 ......... 9.~4 49 1.5..82.,_36_S 59~7 ........................... 4964e .......... 4900 ........... 1023 49 1679.,67_S .......... !!62,52 613.4 50.64, ........... 5.000 ...... 1069 46 13~4_,_65_._5 .............. 1212783 6280 5!64, 5100 1116 47 !868,20 $ 1264,39 6426 ....................... 5264J 5200 .......... i162 46 ii....i 1961.,.26....$ ............... 1315,98 657! 5364, .5300 ..... 1.2.07 45 20.53.,1_9_...$ .............. 1366.,.93 67!6 5A6/+.,_ 5A00__1.25.2 45 z.~k,_3..8_s ....... 6862 ..................... 55.64. ........... 5500 ......... ~.2~8 ............................... 46 ................ 2.236,._4.5._s ............... !472,06 .... ..................... 7008 ................. 5.664, ......... 5600 ......... 1344 46 ................................... 23_28.,_52......5 ............ 152.5,.43 7155 5764, 5700 139I 47 2420,95 5 1580,39 7304 5864, 5800 1/+40 49 2515,53 5 ............................. 9 ................ 5 9 o oli' ; ....................................... Z6.0.2 ~0.6_~, .......... 6,000__.1_5.3.8 49 27 O~ ,_62__$ ..... ~.7..5..~_,. 8.8 .................. 775.0 6164, .......6!00 ....... 1.5.86 /+8 2.7.98.,..08....$ 1808.,39_W ..................... 7.89.8 6264, ........ 6200 ....... 1634 48 .......................... 28.91,03._~5 804.5. 636.4.,, ........... 6300 ....... 158! 4.7 29..83_,_26._5 ............. !920.,3_5_W 8191 6464~ ..... 6400 1727 ~6 ........................................... 3074,65 .5. 1975,26 8388 ............................. 6564~ ............. 6500 ....... 1773 46 ............................. 31666.74.5 2090~59 8/+8_6 6664, 6600 ....... 182.2 4.9 32.60,..72__S ............ 2087.°07 ..... 863.9 ........................ 6764, ................... 6700 ......... 1875__2 ........................... 53 .......................... 3359,7!.~_5 2!~5.,55 ............................ 8799 ....................... 6864, ......... 6800 1935 60 3467e40..._.5 ......... 2209,85 8968 6964, 6900 2004 69 358~o35 5 2280,02 9!4.2 7064, ............... 7000 2078 7.,~ ................................. 37.06,~7_.5 ........23.53.,.40 ]MEASURED-DEPTH-AND-OTHER--DATA--FOR--EVERY..,EVEN 100 FEET._OF__.SUB-SEA-.DEPTH. MEASURED DEPTH TRUE VER T ! C AL__SUB ....... MD-TVD V ERT~_CAL DEPTH SEA DIFFERENCE CORRECTION TO_TAt .... COORD_,i if:JS 9319 9/+96 967/+ 98/+8 10019 10187 1035/+ 716/+, 7100 2155 7_7 383!_..52 .... 5 726_~, ........ 7200 .... 2232 .........................7? ........................... 3955,5!..5 736A, 7300 2310 78 ~+081,01 S 2582,8~+ 7464, 7~00 238A 7~ ~200,69 5 2660,!9 756~, 7500 2~55 7! ~316,92 S 2735,67 7664, 7600 2523 ~8 ~30, ?0 5 .2809,24 7764 , 7700 2590 67 49.~ 2 ..07_S .................... 10518 ................... 786/+.., ........... 7800 265Z+ .................................... 6/+ .............................. /+&50,/+3_5 ......... 29.53..,.~1 10676 ............................ 7.9 6~., ........ 7900 ..... 2.7.!~ ......................... 5_8 ............................... ~_75Z.,~ 3 ..5 ............. 30.2!_e_9.5 .... ~.0.8.3.1 8.06.~_~ ...... 8000 .... 27.6.7 55 ~.8 ~9.,_8 ~__S ....... 30 ~8_,~_3_W 10982 ................... 8! 6~, .........8100 ...... 2 81.8 .............................................. 5 ! .................................. ~9~ Z.,_.O 6_...5 ............ 111.30 82_6~., ......... 8 200 ......... 2866 .......................... 4 8..& ............................ 5030.., 85._.~5 ............. 3 !.!.2_7~ _ _. 8.3.6A., .... 83.00 2.9.~.2 __ ~6 .!! ~!8 8~6~, ............. 8~.00 2 9.5~ ~2 .........................5199.,..07_ $ ............ 3339,05 .... 115 57 8 56 A. .......... 8 500 ......... 2 993 39 ........................................... 5276.32_5 ..............3397, 1~.6.9~ 8..66 ~.., .... 8.600 ....... 3030 37 5.3_4~.,~93_5 34.53.,..62 ................. 11827 .................. 8.76~ , ............. 8700 3063 33 5419,25 5 3508,58 , ................ 1.1 g59 8.86.~, .......... 8800 ............ 3095 ............................................... 32 5 ~ 85.,,68_......5 ............ 3562.,9 12089 896~, 8900 3125 30 55~8,38 5 3517,35 1221 8 9'0'6~-, ...... 9"Ood 3'15~ 29 5~'0'8",'55--'5 ....... ~6~ ..... I'NTERPOLATED._VALUES .....FOR ..... EVEN .... 1000 FEET..OF~..MEASURED DEP~TH, · .................................................................... T'nO MEASURED DEPTH VERTICAL SUB DEPTH SEA TOTAL COORD ];NATES .................... 100,0 ..... 2.000 ~_000_ 4000 5000 6 o'0o 7000 8OO0 gO00 10000 !1000 12000 1000. .........936, &68,_lS__N ............. !O0.,.2.!_W ............................... 2000, .... 1936, 46_8_,_.15 N ...... 100._,.2.1 .... W ...... 2961, 2897, 293,55 N 185,3! W . . 3676, 3612e 334e07 S 470,41 W 4311, 4247~ 1022,32 S 820,96 W 4'9'72, 4908, 1'688,!4-S ......... 5658, 5594, 2323,~4 S 1522,57 W 6333, .......... 6269, 2955,08"'5 .........!gO3-,42'--W 6982, 6918, 3606,72 S 2293,46 7552, 7488e 4304,05 S 2727,31 W 8176, 8112e 4953,0~+ S 3161,69 W 8895, 8831, 5505,86 S 3579,78 W 400- 2400- 32OO . .......... : ......... ................... VERTICAL __ SECTION SCALE I" I000' - ........... i'' - - ! -- ...... : ......... ATLANTIC RICHFIELD CO.' .... ~ ......... RADIUS OF CURVATURE -- ' ! ...... i -'-: ........ ~ ..... ~ .............. MAGNETIC MULTI-SHOT ....... . ......... i : ' .... _ . ....................................... ~.-. ......... 'L' .................... ~ ..................... L_.7.2.._ .......... ~ ............ ~ : ALL DEPTHS SHOWN ARE TVD. 6400 SCALE I": I000' ATLANTIC RICHFIELD CO.- DRILL SITE 4-6 .... MAGNETIC MULTI-SHO~ :5200 4OOO 5200. 76O0 8000 8400 ~ 8800 ...... . ~ TVD= 9,066' I 60oo " i ....... . .................. ~ ....... , 6800 .......... .................................... . ...... : . : ......... , . . '7;'00 ; .... .... ALL DEPTHS.. SHOWN__ '- '. ARE TVD : · ' ~ ..... FOR TYPE OF SURVEY' SURVEY DEPTH: FROM 0 FT. TO 2110 FIELD: COUNTY/PARISH ..~.;.:i;] 0 ..... DATE OF SURVEY 2 ...... :~ ~ ~V2 JO~ No. SU-3-16733 SPERRY-SUN v;ELL SUP, VEYING CONPANY ..................................................................................... PAG'~-' ANCHORAGE, ALASKA ATLANTIC RICHFIELD COFPANY DATE OF SURVEY 2 DRILL SITE '+-6 (23-25-II-I3) COMPUTATION DATE SURWEL GYROSCOPIC PRUDHCE ALASKA 14EASURED _ DEPTtt (BK~) 0 5O 1C0 1.50 20O 250 300 3.5O 400 450 50O 550 65O ~00 750 8C0 IOCO 1C50 llCO 115C 12C0 125C 1300 13~C 14C0 1450 15C0 1550 BAY 9 MARCH 1972 JOB NUMBER SU-3-1 KELLY BUSHING EL ~0~ POINT. AT KBE & li':C TRUE SUB-SEA COURSE' COURSE DOG-LEG TOTAL VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDIN DEPTH ........ DEPTEt ........ DEG "-MIN ............... DEG ........... ~E~/I'~O ....... No~Ttq/SO'uTH ......... EAST/ 0.00 -64.00 0 0 S 0 E 0.00 468.00 N 100. 49.99 -14.00 0 40 S 58 E 1.DB 467.84- N 99. 99.99 35.99 0 35 $ 12 E 0.99 467.44 N 99. 149.99 85.99 0 35 S 26 U 0.76 466.96 N 99. 199o99 135o99 0 20 N 84 W 1.13 4.66.75 N 99. 249°98 185.98 0 35 N 83 E ;'== h 1.82 466°79 N 99,, 299.98 23'5.98 0 25 N 52 E '~""- :: .... 0.63 466,94 N 99. 349.98 ...... 285.98 " 0 ......... 35 N ....62 ;i ..... '::-""~"':" 1.68 ......... 467.17'N ............... 99. 399.98 335.98 0 25 N 82 U ' 0.48 46-/.31 N 99. 449.98 385.98 0 25 N 58 E ' 1.56 667./-~3 N 99. 499°98 435~98 0 30 N 46 W ; 1.4.5 467.68 N 99. 5/t9.97 485.97 0 30 N 34- W = 0.22 468.0]. N 100. 599.97 535,,97 0 35 N 10 W 0.48 468.45 N 100. 649.97 585.97 0 30 N 20 W ~ 0.26 468.90 ti 100. 699.97 635°97 0 25 N 35 1'~ O.BO 469.25 ............ 28 E . 1.21 .............469.66 58 ~ 1.35 469.96 81 W 0°39 470.02 -/2 W ' O. 13 470.08 · -' w ................... o.5 .......... 6,, w ' 1.co 47o.oo 749.96 799.96 849,~96 899.96 9,59.96 999°96 ]. Gq 9,, 96 1699.9.5 1149.9.5 1109o95 124 9~95 1299.9_5 1369o95 1399,,94 1469.94 1499.94 15,5.9o94 685.96 0 40 N 735° 96 0 10 N 785~96 0 20 N 835.96 0 20 N 885.96 0 5 S 935.96 0 35 S 9S5.96 0 45 N 66 1035.95 0 ].5 S 32 10(t5o95 0 35 S 68 113{;o95 0 10 S 67 1]_85o95 0 BO S lB 1235°95 0 30 S 72 1285o95 0 20 N 58 1.335.94 0 15 S 47 1385.9~ 0 40 S 68' 1435.94 0 15 N 85 .. 1485.94 0 30 S 69 1.17 1.51 0.82 0083 0.85 0.98 W .... ,. _ ....... 0.77 W 0.72 W 0.89 t,I 0.92 W 0.59 470.02 470.06 469.87 469.75 469.51 469.23 469.24 469.24 469.06 668.96 468.89 N 100. N 100. N 100. N 100. N 100. N 101. N 101. N 101. N 102o N 102. Iq 102. ._ N 102. N 103. N 103o N 103. N 104. N 104o N 104o MARCH 1972 F, ULTISHOT SURVE 6733 EV. = 64.00 FI ATES VERTICAl. 'WEST SECTION O0 75 W 45 W 51 W 76 W 66 W 26 W 34 W 75 ¥1 77 W 478.50 478,30 477.8", 477.3! 477.27; 477.2!~ 477.3, 477.5 477.'! 477.9 77 W 47U. 05 W 478. 22 W 478. 34 W 52 W 49 41 62 9O w 07 W 33 W 86 W 22 51 82 W 93 W 19 W 52 72 Ir; 07 W 45 H 7b 479.z: 479.8 480.2' 480.5 480.6. 48C.7 480.8 1~80.7 ACC,,¢' %., 481.C 68006 480.8 480.6 48C.4 480.5 480.5 480.4~ 480.4:' W 480.4 ' SPERRY-SUN It[-LL SURVEYING CC]~PANY ........... PAGE 2 ANCHORAGE~ ALASKA ',~TIC P, ICHFIELD COMPANY . DATE ._OF . SURVEY 2 iqARCH 1972 I_ SITE ~t-6 (23-25-11-13) ' CONPUTATION DATE SUR~!EL GYROSCOPIC NULTISHCT-'~'~-'~V~'~--.' I~ BAY 9 MARCH 1972 JOB NUN~aa SU-3-16733 KA KELLY BUSHING ELEV = 64 O0 FT _l r~ T'r~' TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL URL:D VERTICAL VEP, T [CAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATE ;t (~3~.13) DEPTH OEP'FI-! DEG MIN OEG DEG/IO0 NOP, TH/SOUTH EAST/~IES i6CO ....... 1599.94 .......... 1535,94 ................... 0 ......... 30 ....... N ....... .86...!(J ...................... 0,44 ........... 468,82 ...N .............. 105,18 !650 1649.9,1 1585.94 0 40 S 47 W 0.98 468.64 N 105.61 ~/CO 1699o93 1635.93 0 45 S 76 W 0.73 q68.36 N 106.14 I750 1749o93 1685.93 0 20 S 61 W 0.87 468.21 N 106.59 l~qCO 1799.93 1735.93 0 35 S 30 W 0.69 467.92 N 106.84 !850 1849.93 1785.93 0 t0 N 79 N 1.10 467.72 N 107.04 !9C0 1899,92 ........ 1835.92 0 35 S 37 E lo4B 4.67,53 N 106,96 ~0 194 .92 18a5 92 0 25 S 75 W 1.67 467.28 N 106.98 20C0 1999,92 1935,92 0 15 N 38 W 0,79 467,32 N 107,23 2050 . . 2049.92 1945.92 0 35 S 8 E 1.62 467.15 N 107.26 2110 2109.92 2045.92 0 25 N 66 W 1o46 466.94 N 107.41 S VERTICAL T SECTION _W ............. 4ao.47 ......... ..:. N 480.39 W 480.24 W 480.19 479.97 479.81 479.61 479.37 479.46 479.31 479.13 I!CP, IZONTAL D[SPLACEY, ENT = 479.13 FEET AT NORTH~ 12 DEG. 57 MIN. HEST · . .2 CALCULATIGN PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ~ ................................................... ~ ................................ .... SPERRY-SUN ~]E[L sUkVEYING'CoN'pANy ........................................................... PA'GE ..... ANCHORAGE~ ALASKA ATLANTIC RICIIFIELD CFJF, PANY DATE OF SURVEY 2 [,~ARCH 19'/2 DRILL SITE 4-6 {23-25-11-13) ................................................. C'OM~U'T'XTIb'N--~A~'~ ............................... suRwEL'"'GYROSCOPIC MULT'I'sHOT--~E PRUDHCE BAY 9 ~iARCH 1972 JOB NU~',BER SU-3-16733 ALASKA .................. ~ KELLY BUSHING ELEV. = 64.C0 FT,,, ~0~ BOZi',~ A? K[)g ~ Z?CSii'.]O;;gT~iL INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASUREO DEPTH TRUE )ASURED VERTICAL DE PTH (.~.,~) DEPTH SUI-SEA TOTAL VERTICAL RECTANGULAR COORDINATES ]~D-TVD VERTICAL DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 0 0.00 1COO 999.96 2000 1999.92 2110 2109.92 -64°00 468.00 N 100o00 W 0o00 ......... 935.96 ................ ~70.00.. N ......... 101.,' 33_...W .................... 0,.03 ............................. 0.03 ........................................ 1935.92 467.32 N 107.2.3 ~-~ 0.07 0.03 2045.92 466.94 N 107.41 W 0.07 0.00 THE CALCULATION PRC-cEDUR'ES''ARE 'BASED ON A'[LANTIC RICHFIELD COMPANY [;RILL SITE 4-5 (23-25-11-13) PRUDHCE BAY Ai_ASKA ' SPERRY-SUN ¥iELL SURVEYING COMPANY ....................... PAGE z, ANCitORAGE, ALASKA DATE OF SURVEY 2 1972 .................................. COMPuTAT'ION-UAT-E .............................. SURWEL GYROSCOPIC ~,ULTISHOT~ ~URv[ 9 MARCH 1972 JOB NUMBER SU-3-16733 KELLY BUSHING ELEV. : 6q. O0 FT, ~0' POINT AT K~E & II',~CL].I~Oi.~TER INYERPULATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUF ' SUO-S }ASURED VERTICAL VERI'IC bEPTl! (M(B) .... DEPTH ......... DEPT EA TOTAL AL RECTANGULAR COORDINATES ~,D-TVD VERTICAL I-I NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 0 O.CC 64 64. CO 0.0 lbq 164.00 100.0 264 264. O0 200o 0 364 364~00 300.0 46q 466.00 400.0 564 564.00 500°0 66q 66q.00 600°0 764 7~,~. eo 7OOoO 864 864°00 800,, 0 964 9(-,4 o O0 900.0 1064 1064.00 1000o0 1164 1164.00 1100o0 1264 1264.00 1200,0 / - 1.36q ' ' 1364.00 1300.0 1464 1464.00 lqOC.O 1564 1564.00 1500o0 1664 1664.00 1600.0 1764 1764.00 1700.0 1864 1864.00 1800.0 _. . 0 468.00 N 100.00 W 0o00 0 ............... 467.75 N ............... 99.62 l,I ........................ C.O0 ................... O.CO .................................. .. 0 466.84 N 99.57 Fl 0.00 0o00 0 466.81 N 99.52 %'.1 0.01 0°00 0 467°23 N 99.47 W 0o01 0.00 0 467.49 N 99.70 W 0.01 0.00 0 468.1.2 N 100o12 W 0°02 0.00 0 469o01 N 100o38 W 0°02 0 469.80 N 100.42 ld 0,,03 0.00 0 470.03 N 100.70 W C.03 0.00 0 Z,,70011 N lOl.lO W O. OB 0.00 0 470.08 N 102.02 W 0.04 0.00 0 469.82 N 102.64 W 0.04 0.00 0 469.39 N 102.97 ~-,~ 0o04- 0.00 0 469.27 N 103.59 W 0.05 0.00 O 469°C0 N 104.22 W 0.05 0.00 0 468°85 N 104.88 W 0.05 0.00 0 468.53 N 105.74 W 0.06 0.00 0 /~68.17 N 106o66 l'~ 0.06 0o00 0 467.72 N 107o07 1~ 0.07 0.00 SPERRY-SUN WELL SURVEYING COMPANY PAGE 5 ANCttORAGE, ALASKA .NTIC RICHFIELO CCY, PANY DATE OF SURVEY 2 ~4ARClt 1972 LL SITE 4-6 (23-25-11-13) COMPUTATION DATE SURWEL GYROSCOPIC i~ULTISHOT SURVEY !)HOE BAY 9 MARCH 1972 JOB NUMBER SU-B-lbT]] '~KA KELLY BUSHING ELEV. : 64.00 FT. IN'TERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL , );RED VERTICAL VERTICAL RECTANGULAR COORDINATES ~,~D-TVD VERTICAL H (BKB) ......... DEP...I'.H ....................... O.~ P...!.H .............. ~...0. R I~.H/S O.U,T.H ............... EA S T.! WE.. S..,T ........ Q~.F.F.E.R_E N C E. ............ ..C,.. ,.~R_R...E.' C T ..[..ON 1964 1964.00 1900.00 467°26 N 2064 2064. O0 2C00o00 467o01 N 2110 2109.92 2045.92 466.94 N 107.08 W 0.07 0.00 107.2~._W .................. 0._07 ................... 0...00 107.41 ~ 0.07 .._ 0o00 CALCULATION PROCEDURES THE ~EAREST 20 FOOT NO USE A LINEAR INTERPOLA'TION BETWEEN (FROM RADIUS OF CURVATURE) POINTS DecaYer 16, 1971 Re: Prudhoe Bay Drill Site No. 4-6 (23-25-1t-t5) Atlantic Richfield Company Permlt No. 71-35 Atlantlc Richfield Cc~pany l~rth American Produclng Division North Alaska Dlstrict P. O. Box 360 Anchorage, Alaska 99510 Attn: Mr. B. T. Loudermitk C~nt I amen: Enclosed Is the approved application for pemlt to drill the above referenced well, on or about January 18, 1972, at a location in Section ~, Township lO N., Range 15 E., U.M. Well samples and core chips are not required, h~ever, a directional survey Is required. ~4any rivers In Alaska and their drainage system,s have b~n ctasstfle(l as important for the spawning or migration of these areas are subject to AS I6.05.870 ar~l the regulations pr~utga~ed there- under (Title 5, Alaska Admlnistratl~ Code). P¢lc~ to c~ndlng operations you may be contacted by the Habl~t C(x~rdlnator's offi~, Depar~nt of Fish and In the event of suspenslon or abandonment please give this office adequate advance notification so that we may have a witness present. Very truly yours, Homer L. Burrel I, Chai man ALASKA OIL AND GAS CONSERVATION C~tTTEE HL~J: km Enc I osure cc: Department of Fish and Game, P~bltat Section ~/o Department of Environmental Conservation w/o AtlanticR, ichfieldCompany North American Producin9 Division North AI~- '}istrict Post Offic~*--~.~x 360 Ar, chorage, Alaska 99501 Tdephone 907 277 5637 December 1, 1971 State of Alaska Department of Natural Resources Oil & Gas Division 3001 Porcupine Drive Anchorage, Alaska 99504 .... i--~Nd 3 ENG J 4 ENG I 5 ENG 2 GEOL I ..... -~-.- c_~o~--l--- P~V ..... sEC .... [-" CONFER: FILE: ATTENTION: Mr. Homer Burrell RE: Drill Site #4-6 (23-2.5-11-15) Gentlemen: We are enclosing the Application for Permit to Drill, location plat and $100 filing fee in connection with the above subject well. B. T. Loudermilk Dist. Drilling Supervisor BTL/WTJ/mm Enclosures: l~k) rm P--1 I:~EV. 9-30.-~' STATE O,F ALASKA SUBMIT IN THI, AT~ (Other instruetio~.~n reverse side) OIL AND GAS CONSERVATIO'N ,COMMITTEE APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK ·?TPE O~ WORK DRILL [] DEEPEN [] PLUG BACK b. TYP~ OF WELL OIL ~] OA~ ~ ~INOL~ ~ MULTIPI,~ ~ W~LL W~LL OTH~ ZONE ZONE 2. NAME OF OPEt~ATOR Atlantic Richfield Company 3. ADDRESS OIF OP~TOR P. 0. Box 360: Anchorage: Alaska 99~10 4. LOCATION or~I~ ! ~-C Z.~'/At surface . ~ ~'S & ~'W from NE er Sec 34, Ti~N, R15E, ~ 1320'N & 1320'E fr SW cr Sec 25~ TllN, RiSE~ ~ ~. D~TANCE ~N ~LE$ AN~ D~R~T~ON FRO~ N~ARE~T TOWN OR ~O~T OFF~· 300 miles north of Fairbanks 14. BOND INFOtLMATION: TYPE Statewidesuretyand/orNo. Federal Insurance Company #8011-34-40 15. DISTANCE FROM PROPOSED* -'115. NO. OF ACRES IN LEASE ~.OCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also tO nearest drig, unit, if any) 1320 ' 2560 18. DISTANCE FROM PROPOSED LOCAq~ION'* 19. PROPOSED DEPTH TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 5280' 8937 (TVD) 21. ELEVATIONS (Show whether DF, RT, C-R, etc.) 23. PROPOSED CASING AND CEMENTING PROGRA1VI APl # 50-029-20111 6. LEASE DESIGNATION A.N'D SIEP, IAL NO. ADL 28324 7. IF IN'DIAN, ALLO;i-r~E OR TRIBE NA.ME 8. UNIT~FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. Drill Site 4-6 (23-25-11-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay-Sadlerochit I1. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 25~ T]]N~ R15E, UM 1~.. ~o~t $100,000 t7. NO. ACRES ASSIGNED TO THiS WELL 61, o 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START* 1-18-72 SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SE'I'rlNG DEPTH QUANTITY OF CEMEN'i 26" 20" 94# H-40 114' (MD) 500 sx Fondu Neat Circ to Surfac~ 17-1/2" 13-3/8" 72# N-80 2700'. (MD) 875 sx Permafrost II 12-1/4" g-5/8" 4~-1/2. 47. N-80. 8037'(TVD) Stage Cemtd w/800 sx "G" Neat. ~2-1/2 %~ ~ FP ~ ~fl ~ ~]~ Cement & 250 5x Permafrost II 20" 2000 psi Hydril on 20" casing 13-3/8" 5000 psi Hydril, 5000 psi Ca~©Ng~eO!~g~0O~SDp rams on 13-3/8" csg.' ': ' '''~/~'' Logs ~ TD DIL, FDC-GR to surface casing. ~,~'U~0R~~. LL-3 & SNP from 8100' to TD. ~T~Dist. Drilling Supv. (This space for State office use) SAMPLES AND CORE CHIPS R.EQU~ i DIRECTIONAL SURVEY RE~LrIRED YES [] NO CONDITIONS OF APPROVAL, IF ANY: SEE TRANSFIITTAL LETTER A.P.I. N't.riVEEI~CA.L COD]~ ~-~ -- ~' 2_ q - E o/// P~IRMIT APPROVAL DA'I~ APPROVrD ._Cha i rman *See Inmuctions On Reverse Side December 16, 1971 December 16, 1971 '6' 27 445' 420' 382' WELL 2 (Control Pt) LAT. 70° [6' 05.56" LON~ 148° ~6' 51.88" ¥ = 5t950,654 X = 712t 546 ELEV. 2.5.0' Original Ground SCALE= i"=400' CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alosk(~ and that this plat represents a location survey mode by me under my supervision, end that all dimensions and other details are correct. Date SURVEYOR ADDED HOLE No. Po REVISED SURFACE LOC. HOLES DEC. 15~ 1971 A.L,L. AUG. 20~ 1971 ALL. I I II DRILL SITE N°- zt Located in ~iE I/4 OF PROTRACTED ~iEC $4~TIIN,RISE,UMIAT ~ Surveyed for Atlantic RichfieldCompan¥ ! Surveyed by F. M. LINDSEY I~ ASSOC. LAND E~ HYDROGRAPHIC SURVEYO'RS 2502 West Northern Lights Boulevard Box 4-081 Anchorage Alaska! RI5E 7'/IIV 7'ION ID.S.4-5 2:5-27-11-15 D.S. 4-3 /7'3-34-11-15 I D,S. 4-6 25-11-15 I I I I I I I I I I I I I ~, p.s. 25-~o-11-15 '!' ' I I SCALE= I"= I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered and licensed to practice land surveying in the State of Alaska and that this plat represents a location survey made by me or under my supervision, and that all dimensions and other details are correct. ~Dat e SURVEYOR DIVISION OF OIL AND DRILL SITE N° 4 Located in OF PROTRACTED SEC UIVItAT MERIDIA Surveyed for Atlantic R ic hfi e Id Company Surveyed by F.M. LINDSEY 8[ ASSOC. LAND I& HYDROGRAPHIC SURVEYORS 2:502 West Northern Lights Boulevord Box '~-O81 Anchoroge Alaska Lease & Well No. ~)~ ~Z_~]~ ..CHECK LIST FOR NEW WELL PERMITS ,\ ~ '~ Yes No Remarks i. Is well to be locate~ in a defined pOol ................. ~/_~ 2. Do statewide rules ~ply ........................ A~J:~ 3. Is a registered survey plat attached .................. well located proper distance from property line ........... '.7~,~ ,,, 5. Is well located proper distance from other wells ............ §. Is sufficient undedi~ated acreage available in this pool . . 7. Is wel to be dev a ......................... ~ ,, , B. Is operator the.only affected party ................... ~ -.-- 9. Can permit be appro~d before ten-~y wait ............... ~a~ l0 Does operator have a bond in force ll Is conductor string ~,rovided ~,~ · · · · · · · · · · · · I · · . I · · · . · . .,'i : l~. Is enough cement us~ to circulate on conductor and surface ...... '~ 13. Will cement tie in s~'rface and intermediate or production strings . . ' 14. i~ill cement cover al~ possible productive horizons ........... 15. Will surface casing cover all fresh water zones ............ 16. Will surface csg. in:eFnal b,~rst equal .5 psi/ft, to next string ...... 17. Will all casing give adequate safety in collapse and tension ...... 18. Does BOPE have suffi~:ient pressure rating .... Additional Requirements- Aoprova! i~.~. 3mmended: TRM ....... O~ C, _ .~ " KLV , ' JA1., ' HWK ,,,<~,~:,J,~ , LCS -:-'"' ~,, .- Yes - Ho Remarks Is 'well to be located in a defined pool .... Is a registered survey plat attached Is well located pr_o?er distance from pro?erty line . . Is well located proper distance from other wells Is sufficient undedicated acreage availaSle in this pool well to be de'.'i:ted Is operator the only affected party Can permit be a.Dpl-e~=~ before ten-day wait . Does operator have a bond in force ts a conservation order needed . Is au.:,~n;s~rat~ve approval needed . Is conductor string provided ts enouah cement used to circulate on conductor and surface Will ce~e,qt tie in surface and intermediate or production strings . Will ceF.:ent covor al~ '- ' ' :, n c~',.,,n proaucti,'o ~ill su'rfaco casn~g ', ~-c, tec.~ fresh wa~er Will all casina aiv~ ~x=~,'=te safety in collapse, tension & burst - Does BO?E have sufficient pressure ratir, fi ,' ~ Revised 1/15/75 CHECK LIST FOR NEW WELL PERMITS 1. Is the permit fee attached . . . Yes ['1o Remarks ' Lease & Well No. 2. Is well to be located in a defined pool ........ , . .. 3. Is a registered survey plat attached . 4. Is well located proper distance from property line ......... 5. Is well located proper distance from other wells .......... 6. Is 'sufficient undedicated acreage available in this pool ..... 7, ,Is well to be deviated . 8. Is operator the only affected party . . . 9. Can permit be approved before ten-day wait .......... O. Does operator have a bond in force ................. 1. Is a conservation order needed .................. 2. Is administrative approval needed .............. 3. Is conductor string provided ................... 4. Is enouah cement used to circulate on conductor and surface 5. Will cement tie in surface and intermediate or production strings 6. Will cement cover all known productive horizons .......... 7. Will surface casing protect fresh water zones ........ 8. Will all casing give adequate safety in collapse, tension & burst ~9. Does BOPE have sufficient pressure rating '. ........... ~ddlt~onal Requ~rements:~ ~. ~~~,~ _ .~ C_,~/~.. ~~.~(c)~~~ Approval Geology TR,~q JAL Recommended: Enmineerina: HWK OKG HHH Revised 1/15/75 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX.', .. No special 'effort has been made to chronologically organize this category of information. 11 000000 11 000000 1111 00 O0 1111 O0 O0 11 00 0000 11 O0 O000 11 O0 O0 O0 11 O0 O0 O0 11 0000 00 II O00O O0 il O0 O0 1i O0 O0 111111 000000 1. 111 I 1 000000 7777777777 '1777777777 77 77 77 77 77 77 77 7'7 77 77 77 77 uO0000 000000 O0 O0 O0 O0 O0 0000 00 0000 00 O0 00 O0 OOUO 0000 O0 O0 000000 000000 777777'17'17 777777'7777 77 7'1 !'7 77 00 71 O0 77 O0 77 O0 77 O0 77 OO 77 '? 7 '77 660666 000000 obobeb 000000 be O0 O0 66 O0 O0 ~ O0 0000 ~6 O0 0000 66666666 00 OO O0 66b66666 O0 O0 O0 66 bO 0000 O0 68 66 0000 O0 66 66 O0 O0 66 66 O0 O0 6660~6 000000 066666 O0000O 222222 222222 22 22 22 22 22 22 22 22 22 22 22 22 2222222222 2222222222 333 ;133 333333 3.5t3333 333333 ,33 33 33 33 33 33 33 .33 33 33 33 33 33 33 33 33 33 33 .33 33 33 3 3 3 3 313 33 33 33 .33 333333 333333 33 .;1.333 1333333 U U ODDD U U D D U O D D U U O D U U O D U U O D [JUULIU DDIDD SIART* lOSER PCAL [10707,b0233] NONiTOR Sws KLIOE34 JUL'79. *START* *START* USER PCAb [10707,60233] NONI?OR $~S F, LIOE34 dUL-19. *STAR'.['* dOB SHiP SEQ. 1.484 d OB SHiP 8E(~. 1484 DATE 07-NAR-80 DATE 07-MAR-80 10:48:]0 10:48:30 .{ VV VV kk H~ RH VV VV kE ~ RR VV VV EE HR H~ VV VV EE ~ ~R VV Vv EE ~ ~ VV VV EE ~ ~P VV VV EE ~ RP VV VV E,E R~ ~R VV EEEEEEEEEE RH RH VV kEEEEEEEEE RP HR 111111 Illili ii II Ii ii ii 1I 1I Ii II ii illlli IIIiii YY YY YY YY YY YY YY 000000 000000 5555555555 000000 000000 5555555555 O0 O0 O0 O0 55 O0 O0 O0 O0 55 O0 0000 O0 0000 555555 O0 OOO0 O0 0000 555555 O0 O0 O0 O0 O0 O0 55 O0 O0 O0 O0 O0 O0 55 0000 O0 0000 O0 55 0000 O0 0000 O0 55 O0 O0 O0 O0 55 55 O0 O0 O0 O0 55 55 000000 000000 555555 000000 000000 555555 *START* USE~q PCAL [1,070'1,b0233] dob SHiP MONITOR SwS KL10E34 JUL-Tg. *START* FILE: DS~[i:VERIBi.O05<05!>[10707 60233] CREATED: P~IN~I:ED: 07-~tA~-80 10:4~:50 QUEUE SWITCHES: /FiLE:FORT /COPIE6:I /SPACING:I /LIMIT:57 t484 DATE 07-MAR-80 07-MAR-80 10:46:42 LIS Vg~Sl[3N 15.HO1 79/0312,5 SCHLUMBERGER COHPUTING 10707,5023] LENGTH: 132 DXTE$ REEL NAME: F.C.A.L. SERVICE NAME: EDIT REEL CtJNTiNUATIUN NU~qBER: 01 PREVi(iI.}S kE~,L MADE: C[}MMkNTS: LiS ~URSAT CUSTOMER TAPE [)ATE: 801 ]! 7 SERVICE NAME: BOlT TAPE CONTINUATION NUtqBE, R: O1 PELVIOI,IS TAPE NA~IL: COM~ENTS: UNI~Ug ~LL iDENTIfICATION NUMBER IS 50-029-201,11 ~'APE COMMENI~S CSG 9-5/8" (~ ~JOO7 / SiT 8-1/2" TO TD / ~LUID LIGNU~ULJ'~ / D~;NS 10. 10.4 / ~iSC 40 / Pr~ ~().4 / RN 2.20 ~a 52 DF / R~4F 1.3e ~ b2 D~' RMC 2.72 8 62 DF / RH .69 ~ SHT ~9 D~ / ~'ILE HEADER LENGTH: 62 BYTES f'ILg NAME: EDiT .001 ~A,XINUM PHYSICAL RECORD LENGTH: PREVIOUS FiI~E NAME: COMPANY : ,ATLANTIC RiCHfiELD C WELl,, : D.S. 4-6 ~'i, ELD : PRUDH{]E BAY RANGE : 15E llN TOWNSHIP : llN SECTION : 34 COUNTY : N. SLI,JPL STATE : ALASKA DENSIT~ : 800. 1024 BYTES 410 biTES ~IYPE 0 siZE REP C OD~.i Pib~'I~ ~ 1 66 0 DATIJWi 8PE, CiFICA'IIU~'~ bbUCKS: ur,iI'r AP1 APi APl AP1 [-'ibE SIZE SAi'q RI~P PROCESS INi)iCArORS F'T 0 0 0 (.;AP1 42 31 32 P U ~, 2 O 8 3 C/C 42 0,2 1 CPS 4~ 3~4 92 CPS 4 0, 93 GAP1 o~2 31 .::t2 IN 42 28 1 PO 42 68 3 Pti 42 68 11 I 08 OUTPUT GI~ AT 2 OUTPUT NP.i A'I 3 OUTPUT NRAT A'I 4 OUTPUT NCN/, A~[ 5 OUTPU? F'CNb Al' 0 OUTPUT G~ A~: 7 OUTPUT CAb1 AT 8 OUTPUT NPfil A'I 9 OUTPUT DPBI ~ 10 12200.000 12t00.000 12000.000 900.000 11~00.000 11700,000 11600.000 11500.000 11400.000 11300.000 11200,000 11200.000 aNENUNiC [;C N G DPH i DPH1 Gl'< [~ CNL DPH 1 GE ~'CNL D P H I GR [~'CNL OPHl ~CNL DPHI G~ FCNL DPHi GR FCNL DPHI GR FCNL DPHI GR FCNL DPHi GR FCNL DPHI GR FCNL DPH1 VA 2 10 L U -9 -9 -9 -9 -9 -9 . 21. 98. 28. 23. 97. 19. 19. 114. 23. 24. 121. 19. 47. 115. 9. 26. 197. .ii 1. 76. 77. 7. 129. 45. 1,J. 84. ?o: 500 108 7 000 241 609 500 812 234 800 114 56] 800 836 2 34 000 830 492 400 340 734 600 220 574 000 474 58b 4O0 782 695 9. 250 9.250 9.250 9.250 9.250 9.250 M NI:,MON I.C VALUE NPH I 21 . 740 NRAi GR 64.438 CALl VALUE 8.8Ol NPHI 23.400 ~kAl' 2.880 GR 20.469 CALl 8.469 NNEMUN lC NCNb NPHI NCNb NPHI NPHI 17.820 N~A'£ 2. ~08 NCNU GR 24.688 CALl 8. 409 NPH [ NPH1 21.980 NHAI 2.812 NCNb GR 21.672 CALl 8.469 NPH1 NPHI 19.060 NRAT 2.604 NCNb GR 23.484 CALl 8.586 NPHI NPHI 18.720 NRAT 2.b12 NCNb GR 54.813 CALl 8.867 NPHi VALUE 304.590 25.313 295.581 27.000 314.457 21.953 3i9.176 24.594 ~41.913 21.719 322.608 20.156 NPHI 9.940 I~RAT 1.898 NCNb 403.~89 GA 27.094 CALl 8.344 NPHI 18.000 NPHI 28.460 GR 99.375 3.216 9.500 4.146 9.064 3.956 9.102 -999.250 -999.250 -999.250 -999.250 NPHI {4.480 GR 188.500 NPHI 38.400 GR 251.125 NCNb NPHI NC N b N P H I NCNb N P H 1 NCNb NPHI NCNb NPH1 NPHI -99925.000 GR -999.250 NPHI -9~925 000 GR 999~250 CALl NRAT CALl NRAT CALl ,NRAI~ CALl NRAT C ALI 247.533 25.313 191.334 39.094 235.092 39.9:38 -999.250 -999.250 -999.250 -999.250. DATA RECORDS LP~NGIn Q? RECORDS: lOOO BITES I,F;NGi~H Of' LAST RECORD: 46 i3¥'IES ~ ILE I'RAiLEA LENGI'B: 62 BYTES FILE NAME: EDIT .001 51AX[~4UM PHYSICAb RECORD LENGTH: NEXF ~iLE 1024 B~TE5 EOF TAPE IAAILER hENGTH: 132 TAPE NA~E: b0233 DATE: 80/ .~/ 7 SERVICE NAME: EDIT TAPE CONTINUATION NUMBER: Ol NEXI TAPE NAME: C{IMMENT8: UNIOUE WELL IDENTIFICATION NUMBER IS 50-029-201,11 1! · 7 ? 17777777 '/ / 7 177 1777 17 7 ? 17 77 7 t 77 17 ?1 77 17 77 ? 7 0-707, o t (,) 46 } ,JO6 ~::'~,,k:j IF $[!,0. 2541 P-~{"~. *SI'APT* ~[JNI, T(JP, 5¢;S KLiOi~,4(? Ski.'~-~U, *SI",AF:T* I 1I I ittt i I i1 JI. ii i1 Jl ,1 i 1I[ I I 1 [ I P P I-- PIP P P P P p p p.i-' l::' p l:-~ PP P P PP P P I-~ p T ~I' T 'T T T T I T I '1" I' t 'I i.,;* !j U ij I T'T LJ6 'T' T (~ L) Li ! j T q/ [! [.) I. j T T {.i ('.! ( T ]J ti [,) ~ Lt T T (ii) ti tLj l ii;,) 1.5:3a:31 1~:19:14 S H i P T~ PCCC i i. i 111 1I, ill l i I, ii I1. 11 I 1 11 I1 11 1111 i I 1 11 11 I ".).541 I') Al ~ it): 19: !. Il) 7 0 ? ~ ~'~ 10 :~1:6 01 [,)A'I~lL: 80/111 ~ i: I L [- H [:,~ g t) E P. C f') f,! [:: A i,~ '~' ; A I b A ~'.] T I. C ?, 't C H [' i [u b L) C SgC r [ f'l!,~ : s4 5'th'FF. : ALA~r:,A 1,) E, h ~ 1 't' ~' : ~ 0 0. 1024 I t28 i 6u i. 68 1, 22 i0. ()00 2200 .o00 121 00.0()0 1.2000. 000 11 q 00.000 11 80U. 000 I ~ 700. ()f)O 1 I 600. I, J 500. Ot) O 1.1 4()0.000 11 ~t:O.()O0 Gg N C N L 1" C b:l [, bi C i'~ b C;F~ e C N (; P N C tq L, Gk ~ C N L- t',~ C r'4 L i[ ~ C t'-i L ~,i C N L, t ~ ChL. ~t (' .,"i b 1 -9 ! -9 4~. 20<i 23.55 ?. 99.000 48.200 2 ] .552 9 9.000 20. 06.392 8q. 856 15.200 1. 16.74R 't 91.6 ? 7 I. 6.900 !26.984 :] '29. ,~ 72 I 8.100 i 9 2.19:2 40. I O0 144.!4'I 21. 241.52 ? 4 l 8. '70 72.500 9U.090 278.421. 122. ,% 0 () l 8n.. 1 86 -999. 250 ~2.634 999.25(} '99~. 25(i i~ C N L N P }i JL ~ C .i',~ L N P H l i~ P H 1 H C N L !',~ P H 1 P C r,~ L N P h I t~ C N b N [:' h 1 t- CNL .eC NL ? C ,',! L (, t~ C V A 6 [I E 19.760 99.000 -999. ()00 19.760 99 . 000 -,999 000 2 ~. 700 19.700 1 ,n 8. 966 .I 1 ? . 1 17 20. 520 20.700 122. 694 1 I. 980 2 I.. 'l 00 18.5.'.757 1 o. 800 ~, ~. 100 1 "~ 4. ! ~ 4 8.780 25.400 232.518 27 .qSO 76. i~ 0 f) 91 .806 :41.620 122. 200 ~,5.47~ -99925.000 -999.250 f). 000 -99925.000 -999.250 999.25 n tx~ R tx, i t:: P H 1 r~ P, A 1: N ,P H i N R A 'I NPHi N ~ A '1 h P H 1 N P ti i ~i~ HI N ? A '1 N P H i .IL NPHI f~ t~ A 1 m H A 'i V A L U g 2.55(> -9 9 9.0 0 0 2.556 -999.000 2.790 22. 2.14q 14. ? o 0 2.586 21.~bO I .986 12. 800 2.358 1 7.0 ,i 0 1.7 :~ 0 9..'.t O0 2'7.900 ].872 40. J()O 3.blO -99925.0UO -999.250 ~4 iq E iv! 0 N 1 C N C i'q 6 N C N L r,~ k .A T N R A T N C :~ b N R A i, NC nb i'~ C N L N C N 6 NCN6 hal .N C r~ b N lq A :1 N R A I' NP, A i V'A i, U E .] 14.028 -999. 000 -999.000 29 1. '720 3 '? 9.23 b 2.21~ ,]2~.901 3/'7.949 2.080 343.029 2.3'16 420. U49 I. 1 '7 u '!8.850 Z i 93. USU 4.08b 220.941 u. 000 ~99.250 -999.250 80/!1/