Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
177-025
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, July 23, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 09-14 PRUDHOE BAY UNIT 09-14 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/23/2025 09-14 50-029-20249-00-00 177-025-0 W SPT 8468 1770250 2117 1814 1818 1813 1810 218 421 425 424 4YRTST P Bob Noble 5/17/2025 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 09-14 Inspection Date: Tubing OA Packer Depth 478 2500 2464 2453IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN250518165301 BBL Pumped:3.7 BBL Returned:3.7 Wednesday, July 23, 2025 Page 1 of 1 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name: Authorized Title: Authorized Signature with date: Contact Name: Contact Email: Contact Phone: PBU 09-14 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 177-025 50-029-20249-00-00 11080 Conductor Surface Intermediate Production Liner 9152 76 2682 11021 10645 20" 13-3/8" 9-5/8" 8812 33 - 109 33 - 2715 31 - 11052 33 - 109 33 - 2715 31 - 9130 10635, 10992 520 2670 4760 10645 , 10851 1530 4930 6870 10390 - 10915 7"x5-1/2"x4-1/2"x3-1/2" PC , L-80 29 - 10853 8616 - 9022 Structural Otis BWD, Baker-FB-1, Otis WD 9944 , 10198 , 10507 9944 , 10198 , 10507 8274 , 8470 , 8708 Bo York Operations Manager Torin Roschinger Torin.Roschinger@hilcorp.com (907) 564-4887 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028327 Otis BWD, Baker-FB-1, Otis WD 8274 , 8470 , 8708 5592 0 29389 0 0 0 0 0 2048 0 n/a STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Senior Pet. Engineer: Senior Res. Engineer: Form 10-404 Revised 3/2020 Submit Within 30 days or Operations 29 - 8974 Mill Obsidian CBP By Meredith Guhl at 2:22 pm, Oct 01, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.10.01 10:53:42 -08'00' Bo York SFD 10/6/2021MGR15OCT2021 DSR-10/5/21 RBDMS HEW 10/1/2021 ACTIVITYDATE SUMMARY 1/30/2021 ***WELL INJECTING ON ARRIVAL*** BAIL ON TOP OF OBSIDIAN PLUG FROM 10,458 TO 10465' SLM. ***WSR CONT ON 1/31/21*** 1/30/2021 T/I/O=1350/250/50 Temp=110*. Assist Slickline with freeze protect. Pumped 5 bbls of 60/40 followed by 125 bbls of crude followed by 2 bbls of 60/40 down the FL to the tbg to FP. FWHP=1400/50/0 Slickline still on well upon departure. 1/31/2021 ***WSR CONTINUED ROM 1/30/21*** BAIL 1 1/2 GALLONS OF SCHMOO FROM 10466' SLM JAR DOWN ON OBSIDIAN PLUG @ 10466' SLM FOR 1.5 HOURS SSV BEGINS BLEEDING DOWN/LEAKING WHILE IN THE HOLE ***JOB CONTINUED ON 1/31/21*** 2/1/2021 ***WSR CONTINUED FROM 1/31/2021*** RAN 2.60" CHISEL TO OBSIDIAN BP @ 10461' SLM RAN CENTER SPEARS TO OBSIDIAN BP. MOVED PLUG OR PARTIAL PLUG UP TO GLM 2. ***WSR CONTINUED ON 12/2/2021*** 2/2/2021 ***WSR CONTINUED FROM 2/1/21*** SSV LEAKING, RIG DOWN LET VLV TECHS REPAIR, WILL RETURN ASAP ***JOB POSTPONED, WELL LEFT S/I ON DEPARTURE*** 2/2/2021 T/I/O = SI/0/0. Removed DBL Clamp Axelson Powerhead (SSV). Installed Rebuilt DBL Clamp Axelson Powerhead, Pressure Tested Powerhead to 5,000 psi (Passed) & Cylcled SSV 5 times. ***Job Complete*** FWHP = SI/0/0. 2/16/2021 ***WELL INJECTING ON ARRIVAL***(profile modification) RAN 10' x 3" PUMP BAILER TO TOP OBISIDIAN BRIDGE PLUG @ 10,471' SLM (recovered 1-1/2 gal schmoo) RAN MULTIPLE SPEARS/GRABS TO TOP OF OBISIDIAN BRIDGE PLUG @ 10,471' SLM (no movement) ***CONTINUED ON 02-17-21*** 2/17/2021 ***CONTINUED FROM 02-16-21*** RAN 10' x 3" PUMP BAILER TO TOP OF OBSIDIAN PLUG @ 10,471' MD (recovered 3 cups schmoo) DROPPED STAR BIT W/ 5' X 3" STEM FROM SURFACE TO OBSIDIAN PLUG. MADE 4 ATTEMPTS TO PULL STAR BIT / STEM FROM OBISIDIAN PLUG (~5 mins total jar time, see log for details) ***CONTINUE ON 02-18-21*** 2/18/2021 ***CONTINUED FROM 02-17-21***(profile modification) RAN 3.60" BELL GUIDE W/ 2-1/2" JDC, PULLED SPEAR FROM OBSIDIAN PLUG @ 10,471' MD RAN 2.5" CHISEL TO OBSIDIAN PLUG @ 10,471' MD, JAR DOWN 1hr (no movement) ***WELL S/I ON DEPARTURE*** 2/22/2021 T/I/O = 1220/440/410. Temp = 128°. Bleed OAP (UIC). OA FL @ surface. Bled OAP to BT to 0+ psi in 1 min (0.2 bbl). IAP seceased 10 psi. Monitored for 30 min. IAP unchanged, OAP increased 10 psi. Final WHPs = 1220/430/10. SV = C. WV, SSV, MV = O. IA, OA = OTG. 21:30 2/25/2021 T/I/O = 1310/440/20. Temp = 128°. WHPs (post bleed). TP increased 90 psi, IAP & OAP increased 10 psi from 2/22/21. SV = C. WV, SSV, MV = O. IA, OA = OTG. 05:00 Daily Report of Well Operations PBU 09-14 Daily Report of Well Operations PBU 09-14 5/3/2021 T/I/O= 1881/571/138 Temp= 120* AOGCC MIT-IA Passed @ 2462 (Witnessed by Lou Loubenstein) Max applied=2500 Target pressure= 2250 psi. Pressured up IA to 2490 with 2.9 bbls 120* diesel. 1st 15 min IA lost 21 psi. 2nd 15 min IA lost 7 psi for a total loss of 28 psi in 30 min. Bled IA to 570 psi and recovered 2.9 bbls. SV= closed. WV SSV MV IA OA= open. Final Whp's= 1890/570/155 9/7/2021 CTU #9, 1.75" CT - 33.7bbl, Objective: Mill CBP. MIRU. ...In Pogress... 9/8/2021 CTU #9, 1.75" CT - 33.7bbl, Objective: Mill CBP. Continue rigging up. RIH with Baker Venturi and 4.40" burnshoe. Tagged burnshoe at 10461CTM and milled. Pushed CBP to CIBP at 10645MD 10637CTM. POOH. Recover multiple pieces of element, portion of the core, and multiple pieces of slip segments. RDMO. DSO notified of well status on departure. Well not freeze protected as operator will immedeatley put on injection. ***Job Complete*** MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Lou Laubenstein Petroleum Inspeelor NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, June 3, 2021 SUBJECT: Mechanical Integrity Tests Hilco p North Slope, LLC 09-14 PRUDHOE BAY UNIT 09-14 See: Inspector Reviewed By:-J,,,� P.I. Supry 5rz— Comm Well Name PRUDHOE BAY UNIT 09-14 API Well Number 50-029-20249-00-00 Inspector Name: Lou Laubenstein Permit Number: 177-025-0 Inspection Date: 5/3/2021 Insp Num: initLOL210503172238 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well o9 -la Type Inj w TVDT $46$ Tubing ssI . 18ss 895 • 893 - 0 PTDI mozso Type Test sar rest psi j v n IA 521 2490 - 2469 • 2462 ' —_L BBL Pumped_ 2.9 BBL Returned: 2.9 - OA 155 334 - 33$ iso Interval 4YRTST P/F P r Notes: 4 year test Thursday, June 3, 2021 Page I of I MEMORANDUM TO: Jim Regg � a P.I. Supervisor ' lelq 51161WZA FROM: Lou Laubenstein Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Cas Conservation Commission DATE: Tuesday, May 11, 2021 SUBJECT: Mechanical Integrity Tests Hilcoip Noah Slope, LLC 09-14 PRUDHOE BAY UNIT 09-14 Sre: Inspector Reviewed By: P.I. Supry .-TE�fz Comm Well Name PRUDHOE BAY UNIT 09-14 API Well Number 50-029-20249-00-00 Inspector Name: Lou Laubenstem Permit Number: 177-025-0 Inspection Date: 5/312021 IRsp Num: mi[LOL210503172238 Rel Insp Num: Packer Depth Pretest Initial 15Min 30Min 45Min 60Min Well 09-14 Type Iaj w Tpp s2 "Tubing 8a1 1885 ' 1695 ' 1893 PTD 1770250' Type Test SPT' est psi 2068 IA 571 2490 ' 2469 2462 - BBL Pumped: 2.9 - BBL Returned: 2.9 OA us 334 338 350 Interval 4YRTST PIF P Notes: 4 year test Tuesday, May 11, 2021 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To Jim Regg l DATE: Thursday,May 25,2017 P.I.Supervisor2e/tel `�j2�f i' SUBJECT: Mechanical Integrity Tests l BP EXPLORATION(ALASKA)INC. 09-14 FROM: Brian Bixby PRUDHOE BAY UNIT 09-14 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry .` NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-14 API Well Number 50-029-20249-00-00 Inspector Name: Brian Bixby Permit Number: 177-025-0 Inspection Date: 5/25/2017 Insp Num: mitBDB170525144052 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 09-14 Type Inj W TVD 8272 Tubing 1381 ' 1384 ' 1384 - 1384 - PTD 1770250 Type Test SPT Test psi, 2068 - IA 454 2497 - 2485 - 2484 ' BBL Pumped: 3 BBL Returned: 3.3 ` OA 13 95 105 120 Interval 4YRTST P/F P Notes: SCANNED ?r07:, Thursday,May 25,2017 Page 1 of 1 ' STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMIO REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate H Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: ❑ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 177-025 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service RI 6. API Number: 50-029-20249-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-14 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11080 feet Plugs measured 10645/10851 feet ECEIVED true vertical 9146 feet Junk measured 10992 feet JUN 2 Effective Depth: measured 10471 feet Packer measured See Attachment feet ,1 N 3 2016 true vertical 8678 feet Packer true vertical See Attachment feet AO G CO Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 76 20"94#H-40 33-109 33-109 1530 520 Surface 2682 13-3/8"72#N-80 33-2715 33-2715 4930 2670 Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 0 7R Treatment descriptions including volumes used and final pressure: 1C('® ED DEC 8 20% 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 8952 450 2048 Subsequent to operation: Shut-In 80 1218 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory ❑ Development 0 Service ® Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG fI GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Sae5��_ _e. e� Phone +1 907 564 4424 Date 6/23/16 Form 10-404 Revised 5/2015` Vi �—/g/ 1(-Xi�i�i RBDMS VV JUN 1 4 2016 Submit Original Only i • Packers and SSV's Attachment PBU 09-14 SW Name Type MD TVD Depscription 09-14 TBG PACKER 9946.8 8274.06 5" Otis WD Packer 09-14 TBG PACKER 10200.28 8470.37 5" Baker FB-1 Packer 09-14 TBG PACKER 10509.4 8707.66 5" Otis WD Packer 09-14 TBG PACKER 10655.1 8819.46 6" Otis WD Packer 09-14 TBG PACKER 10773.62 8910.42 6" Otis WD Packer 09-14 TBG PACKER 10844.69 8964.95 5" Otis WD Packer m a o o 0 0 0 0 0 0 0 0 RCN- (0 (0 (0 (0 oeoo � - CO O N- O N- O V N N L[) O N tf) v (C) Lo t.[) CO O U y o 0 0 0 0 0 0 0 0 0 0 L M M cn I- Lor Lov v v M � (nrn � w � oo � N � � v m v oo co m co ao r- r- r- ao - cnommmv• (o � vrnv h- l[) O0 O = N a0 O O O N N N- CO M M CO M CO CO I lllll N O 6) CO 00 0 6) O U) M M 0 = M N O M r- c- M M M M 0 M 0 O N N CO O 6) N N- CO CO CO CO CO CO N N O O O r 0 0 0 0 0 0 Qr O IC) CO (0 M M c- LC) O O O O M tC) N v 0)Q) co co co N O O N g 000 • C r r r MCO py�W O ' tf) O O CO M OCO M O 6) O O CO OD 1. _„ (f) (n , w O �i �i Z Z co J J ---I Ct • o •� N V N v v N 6) cn 61 - - - v M c- - C -CO - CV N N - U 0 OM NN - co r-- M , Lo 6) (3) M 6) 6) 6) v t (NO) IO - I- COLc) t1) N -;r• v O N N- C) N N co ' (O O Z Z Z Z Z o,O 00000 cHwHF- f- � ' 0 0 0 0 0 0 0 O Ou_ 0 0 0 0 0 Z Z Z Z Z Z CCO O O O O m COm m m 0DCCCCCC2CDDDDD UCf) d0_ CL3 0 - HHHH O i a) Co m m6) N 6) N O Ln 10 M O '- 60 ) C() N— O OND N CO -- (0 6) p_ co V' coc0 N M f� N r---: (10 V' LL) in ,- N N O L() C)) N co co y CO LC) CO 1� — N- CO N- CO 00 CO O O O ' 00 CO CO LI) CD CO 10 CO c- ❑ (0 CO (0 (0 1` CO N- N C>D P N- N N- CO CO CO 00 00 00 00 O 00 6) C D C D O ❑ CO CO CO CO CO CO CO 00 CO CO CO OD CO 00 CO 00 00 CO OD CO CO 00 CD H O. 0 H (O M CA 10 (n 6) 6) N 1- V 6) COM LC) N N V M Ln z M N N O) (0 O V N c- IC) M 10 = 6) M N- (O O 00 (0 6) O O Q- L17 CD 00 (N M 00 N 1� M N Ln Lf) . M N N V N 6) N 0 d = 10 Lf) (0 O c- N V N- N CO OD C0 O O O = M M CO '4Y CO C)) W ❑ (O 0 (O (0 N- N M N N N- N N CO O CO C0 00 0COCO OO 6) CD 6) > O COCOMMWM C M M O C10 COM O COc0 O aM O M ao O O 00 0 I- w w fY 0 w 0 0 W Z IW- w O a W ❑ W Q QJ CoY 0 0 > CO IC) Ln (010 (0 In L1) W Y Y H W .c 0 0 0 M M N CM O N Ln C) b N c0 O) L- -j 0 U W W N V (n (0 N M O UP (O M V• N (O N- V- LJ7 '- N O L() .- N (O = J J J Q Q w1-1-} (C _4-1 O O O O O O O O O O M O O CO O O O ti M CO 00 6) < < < w d a Q Z 0 W ❑ 0000 = 000 = 000 C) 0 O O O O O U U O J WJ WJ ❑ Co = = = - r v Q Q Q O 0 0 a w J a a) 2 2 2 z -C 2 00 01-1-I g Z OH Z 0 2 2 2 O ccnn w wow u — ) _ o) 0. Q0 O = t 0 (0 O O N CO N ON UP O M CO 11- O CO O 00 p O) M 10 N M O O M (0 N- COCO • N �Y O CC) 00 o MM m M d V V LC) Lf) L() (n (O O O (O M M V M (0 N N N CO CO00 CO I.IJ ❑ 0 0 0 0 0 0 0 0 0 0 0 O O O 000 0 0 0 0 O 00000 yam - - r L a) CC NY W CC 2 H H Hd 0- _1 L 2 2 0 cn cn cn co co w O. a) 0 0 c tii• i— Ho_ Hma. mmmrimmmmamo_ mma. mmmmmm a, (1) )) (nmmmmmmmmmmmmmmmmmmmmmm 0.0 a, w a w H m M O O (O (o (0 (o (o (0 (0 (o (O M 0 (o (0 (o M (0 (o (O (0 (0 (o (0 (fl j 00 0 = = = r-c) = = = = = = = = = c- = = = r = c- r = 0 J Z 0 0 0 0 0 0 0 0 0 0 0000000000000000 J N N N NZ 1.1_ - CP < 11 W _N N_ N_ N_ _N N_ _N N _N N_ _N N _N N N N_ N_ N N_ N_ N _N M O m 6) O d V d' d- V d' V d- V NrV cNNrV V d- V V d" p W JJ 0 J 11 0 W a' i \ N N N = c- c- = = = c— = = = = = = c- = = = = v— c— c— = Z a J` J 0 11 W W LL W of O L() in lf) (CI OYD W J --I3 '<7 O W W Q Q T) a (n LL it 4 W cn a a, E m Z v- I- v v v v -4 crv v v v v v v v Nrv v clv v Cl) 6) 0) 6) O) O) 6) 6 CA (A CA 6) (A O 66 O) 6) 6) (3) C))id) O O 6) O 6) CD a a a 0 J 00 W a C) C) 0 0 C) 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 O O O O O < Q CO MLLE (n (n (L M 0 110 11111 p =• o O o J N C[ p UJ N Q Z D O ww cO J H Q o = 0 N z O < c o O w Q E 2 Q a p = O Q Q 2 w Z Z u w ~ 7, 1 W QQaQZ '1 1:1) Z W WZ O 00 O mJ 2 (/) W 0 0 0 o O a m a Z w o D v) LL LL 10 E- c- a p p JCK ›L > p X X Q w p 6) c - in o p N Q • F- 06 I Z Q Z , C) wp " °� 5 II ED C) WQ `— N0JJm 75 EDED011'W Z 0 W I- Q c0 o >- p H N Q m _ Lr)) 0 TREE='- FMC GEN 1 • - — --- . A€LL1-EAD= FMC S Y NOTES: H2S READINGS AVERAGE 125 ppm ACTUATOR= AXELSON 09-14 WHEN ON MI.WELL REQUIRES A SSSV WHEN ON KB.9f\/= 54' MI. "'"JEWELRY DEPTHS ARE 18'DEEPER THAN THE BF ELEV= ? REFERENCE LOG'"' KOP= 3007' Max Angle= 46°@ 6739' 2196' -{7"CAMCO BA L-0 SSSV NP,D=5.937" Datum MD= 10700' Datum TVD= 8800'SS {-1-3-3/8"CSG,72#,N-80,C1=12.347 .1-1 2712' 3 F------ 9933' -17'X 5-1/2"XO - T"TBG-PC,26#,L-80,.0383 bpi,ID=6.276' -®_ 9933'mj�' 9944' -19-5/8"X 5-1/2'OTIS BWD PKR TOP OF 5-1/2"TBG-FC H 9933' i 9967` 9-5/8"X 5-1/2"XO MLLOUT EXT 23 10198' -{9-5/8"X 5-1/2"BAKER FB-1 PKR Minimum ID =2.76" c 10851' 10217' -19-5/8"x 5-1/2"XO MLLOUT EXT 3-1/2" OTIS XN NIPPLE I 1 I 1, 10264' N5-1/2"OTIS XN NIP,ID=4.455" i PRODUCTION MANS ST MD TVD DEV TYPE VLV LATCH PORT DATE L 1 10319 8562 40 LB OW RO-5 0 04/04/90 L 2 10436 8651 40 LB FLWSLV RM - 01/10/16 I I 3 10562 8748 40 LB SO RO-5 51 05/10/92 5-1/2"FES OBSIDIAN CBP(01/04/16) 10471' 4 10633 8803 40 LB SO RO-5 51 05/10/92 10454'ELMD STA#3&4=BELOW OTIS BWD PKR@ 1050T M 10507' -19-5/8'X 5-1/2"OTIS BD PKR 0 W10528' -I9-5/8"X 5-1/2'XO MLLOUT EXT 10645' --I BAKER N-1 CSP M Z 10652' H9-5/8"X 5-1/2"OTIS WD PERMA-DRLL PKR 1 10720' -5-1/2"AVA BPL NP SLV W/2-13/64" HOLES,ID=4.223" 5-1/2"TBGPC,17#,L-80,.0232 bpf,D=4.892" H 10782' 10771' 9-5/8'X 5-1/2"OM WD PERMA-DRLL PKR [TOP OF 4-1/2"TBG-r --{ 10782' / 10782' -{5-1/2"X 4-112"XO PERFORATION SUMMARY REF LOG:BRCS ON 08/04/77 ANGLE AT TOP PERF:40°@ 10390' Nate:Refer to Production DB for historical per/data SIZE SPF INTERVAL OpnlSqz DATE 1 10819' -4-112"AVA BPL NP SLV W/2-15/64'HOLES,D=3.7" 3-1/8" 4 10390-10420 0 09/10/84 3-1/8" 4 10436-10466 0 09/10/84 2-7/8" 6 10440-10450 0 05/29/16 3-3/8" 6 10512-10532 0 06/27/03 3-1/8" 4 10523-10543 0 9/10/894 T 10842' -9-5/8'X 4-1/2"OTIS WD WIRELINE SET PKR 3-3/8" 4 10560-10622 0 03/21/90 3-3/8" 4 10633 10645 0 03/21/90 L 10844'_J-14-1/2"X 3-1/2"XO 4 10667-10707 C 11/19/77 4 10740-18754 C 11/19!77 10851' -3-1/2"OTIS XN NP W/XXN 4 10808-10828 C 11/19/77 8 NO-GO PLUG,D=.001" 4 10850-10869 C 11/19/77 10853' H 3-1/2'TTL W/OTIS WLEG 3-3/8" 4 10880-10915 C 04/06/84 I 10848' j-jaM3 TT LOGGED 05/22/89 1 4-1/2"113G-FC, 12.6#,L-80,.0152 bpf,D=3.958" - 10844' a j 10992' -{FISH-(2)CENTRALIZERS&(2)SINKER BARS -1TOP OF 3-1/2"TBG-PC 10844' 3-1/2"TBG-PC,9.2#,N-80,.0087 bpi,D=2.992" - 10853' W.W.���.���. 11007' �PBTD - - '�'/'.'1'1'/'4'111 9-5/8"CSG,47#,N-80,D=8.681" H 11049' DATE REV BY COMMENTS DATE REV BY COP ENTS PRUDHOE BAY MT 08/22177 ORIGINAL COMPLETION 01/10/12 TM'MJM) ADDED I-i2SSAFE!Y NOTE WELL 09-14 04/04490 LAST WORKOVER 01/12/16 GJB/JMD SETCBP(01/04/16) - PEFIIA1'No: 1770250 09/02/02 BHGTP PERF CORRECTIONS 01/12/16 MGS/JMD WFR C/O(01/10/16) API No: 50-029-20249-00 06/27/03 BJMKK ADPERFS 05/31/16 LAGJMD'ADPERFS(05/29/16) SEC 1,T10N,R15E 4040.15'FEL&1180.14'RV_ ~ 11/07/09 RCT/SVMV D CORRECTION 06/09/16 BS/JMD MNOR WBS UR:147ES y 02111/11 M3/J4/0 ADDED SSSV SAFELY NOTE BP Exploration(Alaska) STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMM ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations WI Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 177-025 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ® 6. API Number: 50-029-20249-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-14 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11080 feet Plugs measured See Attachment feet true vertical 9146 feet Junk measured 10992 feet FEB 0 9 2016 Effective Depth: measured 10471 feet Packer measured See Attachment feet true vertical 8678 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 76 20"94#H-40 33-109 33-109 1530 520 Surface 2682 13-3/8"72#N-80 33-2715 33-2715 4930 2670 Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 11297 450 2048 Subsequent to operation: Shut-In 60 0 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development 0 Service ® Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG WI GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-673 Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature J I t w ,, (j 1 Phone +1 907 564 4424 Date 2/9/16 Form 10-404 Revised 5/2015 v 2/1411' RBDMS LL FEB 1 0 2016 Submit Original Only . • • • • Plugs Attachement PBU 09-14 SW Name Date MD Description 09-14 01/04/2016 10471 5-1/2" HES OBSIDIAN CBP 09-14 05/11/1992 10645 5.5" Baker N-1 CIBP 09-14 3/23/1989 10851 4-1/2"XXN No-Go Plug . • • • Packers and SSV's Attachment PBU 09-14 SW Name Type MD TVD Depscription 09-14 TBG PACKER 9946.8 8274.06 5" Otis WD Packer 09-14 TBG PACKER 10200.28 8470.37 5" Baker FB-1 Packer 09-14 TBG PACKER 10509.4 8707.66 5" Otis WD Packer 09-14 TBG PACKER 10655.1 8819.46 6" Otis WD Packer 09-14 TBG PACKER 10773.62 8910.42 6" Otis WD Packer 09-14 TBG PACKER 10844.69 8964.95 5" Otis WD Packer • • d 0.o 0 0 0 0 0 0 0 CD 0 0 co M N ao c0 0o O oo r op 00 O — CO O N O O N N LO O p N L() V' LO LO co co I-- 0 y 0 0 0 0 0 0 0 0 0 0 0 0 i co M LC) N- LO N- LO M 3 LO 0) r 00 r CO r N I� N "Zr r c0 CO CO CO CO N N 0 CO Or LO O 0) CO CO LC) N- C3) V r LL) r O N N CO V r CO I. I- 6 O L() O .— N c0 CS) CA Cr) N N N CO CO 0) CO 00 00 CO CO O O) 00 00 Lf) 0) O LO M 01 Ln r CT N O O r r CO CO CO CO LC) O Ln (fl N N CO 0) 0) N N- CO CO CO CO CO CO C Qn LI7 O Ln (0 CO N in (3) O CO O h Ln c O O N co co r NN 01 O O r 0 0 0 0 0 r r r r r V- (0)V Qr O LU CO CO LU LU . LO L Ch Cr) r L() O O OO M L() I� Q) co M M LL) r OO O N O 0 0 0 MO N Q) r r r M N1 l• A O Lf) L() LO O 00 OO 0) O O) O O co O 6 O 00 6 co co 00 i 00 - � Z � Zco _1„ 1:k Ct cc cc•� N• 4 N 4# N 4 N- � N N (co M Co - COO - 0\0 N N N - N V o CO o ,r) CO CO r-- C'7 �? rn CA Ln Ln i i ✓ O) 0) 0) v M z 0) LOCD CO CO r N CD CD in Nr CO Cfl Ln LLO CO 0) L0 N J N N CO r (0 O r Z Z Z Z Z 0O 00000 • F- w F- f- F- F- F- 0• O u 0 0 0 O O Z Z Z Z Z Z w 0 0 0 0 0 m m m m m O D CtrY lr a D D D 0 (n d CL CL d CL F- F- F- H F- • • N . CIDLOM .1- 00 C3) N O Lo �7. Ln M O MC` O cco N CO co0 O p_ CO ciO N M N OD V Cf) CO N N N CA Cf) O N M O a M � N M N- CO„ OO co co a) O O v- ' M M CO CA M CO CO O CO CO N- CO N- NO N- N- N- N- W CO CO CO CO CO CO CO CO O) O) 0) O CO 00 CO CO CO O CO CO CO CO CO CO CO CO CO CO CO CO CO CO O) F O_ O 1- CO M LO O) O) N C- O) CO M .- 0 CO N N O t C'') O L CK) N CO O CO V' h Lo M t0) M C- . O 00 CO . O) O O i 0 r O 00 CN 0 00 `- N Cb N lO LO r r O N N O , 2N- Lf) O N V N- CO 00 CO CO O O O c- v CO C01 CO 'Cr CO 0) O CO CO C- N- CO N- N N- N- N- CO CO CO CO CO F6 CO 00 CO 0) O) O) CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO H of N t0 CO CO LO CO LO CO LO Ln CO LO CO s O CO M N M O In CO M N 0 CO r r V _N CO 0) CO N 0 N M CO 0 0 0 = C M M ct 0 'cY N- N ON- N- CO CNO COO CA °' (N CO CO C) CO CiJ o 0000000000 000OCOOOCOCo (oo00000 0 = 1- = ‘- = ‘-- 0000 = 000 ,- 000 a� 2 (.) ' I Q Cr)a O ° _ M O CO N M N O N 0• 0• •LO 0 C •0 0• 0• CO N- • •0 0 CO CO O O G M CON M CO O CO 0 CO M 0 C� 0 N O CO 00 O MM a) M V CO CO CO LO CO O O ' 0 M M Nr CO CO N N- N- CD CO CO CO :47, W00000000 (0 (OCOCOOMM (0000 (000000 0000 = 0000 = = 00 = = 1.- = ‘-- CCM 000 00 L m 0 � CI. a cA u) M m M M m M M M m M m m m M m M M M COM M M 0 St d a m 0 0 o co 0 0 0 co 0 co 0 0 co co co co co Lo 00 co co 0 co Lo mm C M M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N v r- r- r- o. 0 a) E N rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn c d d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • • • 0 w 0 W 0 LU � w 0 0 Z W 0 F a > g g Y 0 0 co Y Y 0 O O J U U F- Lu LLI J -' -' d d [n Z < < < J W W C� J C7 QQ o< a IT a 2 2 2 Z 0 0 0 0 0 W Z 0 Z UJ UJ LLI a_ 2 2 2 0 v) coU3CJn U3 cn 20 a I- - J 0- 2 0 cn U U co co f- :• -D 0 U LL 1- 1 W N N LL W 11 a JJ J Z ;9 J :7 U ww w w w CO 01 D1 W J --! DQ 0 W W Q < 33 0_ m cn LL LL :n LL Cl) a f2 LL a CO 0 J U N LL m a a a Q Q m m LUL LL u") co d ct • 0 E II > c U) M U) c () 0 70 * m L (;) U) 0 o _ MOYc > C 2 0) c 20 6 L o Cl) o, - a)15 m Q �o cm0LUtC as L Q� LL. o N o0aal� � C m a, a is m � c? W a) v) � @ a aIf OH 0-c , g o m to O c~i) o_ a -a _c co a C � _ o Cl) � � 0 o Z t a) CD W O mn U) c CC '02 ,, M1:3 r c s Q Q Q 15- QU s c 0 N E � Z � Q H 2D p U) _ 0 w N b J * 0 CO N W a 10 mn a. J (n \ - m M a is N 0 c6 Q T U) -0 L - O W Z O co - O O -0 v) Cl) -a- = N 3 0 colli `- p_ wo E `* °' CN - E _, o _1a_ C - m o o �.j0223r a) OM r o U) rU) O >- c- -0 ° -ate oo E QJ - � o o c O Qia * a. = o � � c) a) � LLU) co as o � 2r II ° L U0 I H L 2 pL0 E .,' OL a) OO O2D � F' NU) fl-U) U) � Q c QW NU) � w Q o0? a ,- n a) co Q-0 � vU) E� * � � cA ill- _J : UY- Y- v > 2 r a) c a) C3 - Oo0 � zr �rr � U) rD �`rt0 O w* W -p W O M }0 II : '1" H = 1:1- a O FA O .zr C3) * N U) V O J r m0 Viz +-' DCO 0 cor 2 �tr- oN O V '1- 0z r � J w . 0 -a0 a, c 0_ aN � J �O HWDa (�1 o '-- W aZ@)w � C W w 0 c c , \ 2 LOX m N U W D U v(Y)r O _ LY)'- to 1 D o ` m f = o � � UZo � Q WZ -i * � o w � � o < mW m c , OWN cn QHC/) WH ;; c o W = I- 1- d O o y U) r O m O o OH * D a H * m Q c H a O a) O w H U) 0. -0 o � c L QO � CO } mm �O U , 2UJ �O > J 176b) mZUF- * C) o � U) mp E O E II Q� g0 � 0 � \ mr () EtJ7c rJ -' wzz � � �°, J Qp � � � woz - 11 ,706 > c" - ° 2� OCLm C`� C a) 2Dinu>..ID J (0 = _ �' EY _a = oD . H0 oooOa_ > O ° 112 _7D _ J p 2 > _O Q a � � �Mo 0 c Q� Mam W � aO � U) � D �2 LL O ` 2U) W N W c T L N 0 i J U) HU) U) D2HU) W c U) H � 5JQ Z a) oH13 � � � o_w m < J C2mm --- 1 � Da � 2E > a = OJ } W z � O o - o H o m M O -.= w _ U < W N o W 2 � W W - H W W Zm " a 0 U H O Q c N > c 2 D o D 0 H 2 DH 0 D z m Oo � M _ QZZoCN ZN Z - zz c zH " W HU) a0 m O _O F- Q N O N D p Q N _ w J 0 U OYo a� W W mu 0DZH76 1 4 Z � )Zi W W zm � N Z W � � UJW > � O _ _, ,,, ....., C0 aiz E � o VazzH o � O � � H � � O c°)n n UOYZH J * * Ci) () O MS 0 n 4 * oc < < W O * -- = * W DQ * 0 C * <C ‹C W D * * � > U) NHDOaQU * 0a' a' U) sp * HH * U) a2 * * Do * 2aU) a * * oc * W H 0 CO CO CO C0 CO CO CO (0 r r r O O O C) CD O O O H N N N N N N N N CO CD I= r r r r r r r 0 Q • 0 o \ I ,, 9 T / 2 § $ ƒ E 0 R \ 5f ° O \ $ _o / 0 mo D 0 t / I ® % $ 0 9- / E/ E _C / § § t / k c I � / 0 \ § / e - 2 e a_ .- _ I- o_ i :@ 9 LU R \ z � • » - o _12 R - \ / / a m2 m c « co - / \ e 0 » IP ag / vin 2 ,?.' 0) % _ _ H 0 _l2 MI :7 / c •/ƒ 0 O� m - / \ a f. R & G I . k / 7\ cn= R co .0 --`2_ 6 § —O m / \ % 'S 0 R c \ 2 o © e m t m [t R o \ &— mom m E O $ / f 2 4 / Ra O 0 2 7 7 $ 6 & f w ƒ ƒ m o $ $ k » &2 ©> # e a < c \ fo -- * ƒ > / Eor - 0 (0 ® # - (0 / 7 UJ ..-- Ce 6 = s o u _ o > Z 2 > E\ i / \ • \ / ® n i 2 O c . E e m 7 = -J O Z CU Wm CI � ® / \ / / ' rY3 / / / -I ? / \ / ( � 9 � 0 2 0 # m m p = c ® = co-o @ \ m ¥ § 2 # c c .e - R o - m u ¢ N ± o 7 - 0 & w $ 0 - 2 \ 0c / E ,_ _ , / � - G / � 4 � _c m - E -0 ._ = e 2 0 m 2 0 �� W / o e 7 § ƒ R 5 4 E ƒ E w / _ § / \ . ¥ C / 0_(/) ƒ \ / \ RDRD / - 0 / $ k GPS 2 2 2 | 0 / $ m $ i i Z 0 / \ . = 0 0 / CV N / ® \ / \ \ r 0) \ ,- Ewe # - m TREE= FMC GEN 1 • WELLHEAD= FMC SAFETY NOTES: H2S READINGS AVERAGE 125 ppm , ACTUATOR= AXELSON09-14 WHEN ON ML WELL REQUIRES A SSSV WHEN ON EL KB. EV= 54' MI. BF.ELEV= ? KOP= 3007' Max Angle= 46°@ 6739' I 2196' H 7"CAMCO BAL-o SSSV NNP,D=5.937" Datum MD= 10700' Datum TVD= 8800'SS 13-3l8"CSG,72#,A So,D=12.347" — 2712' I— 9933' —17"X 5-1/2'XO r TBG-PC,26#,L-80,.0383 bpf,ID=6.276" H 9933' 9944' --(9-518"X 5-1/2"OTIS BwD PKR TOP OF 5-1/2'TBG-PC — 9933' I 9967' —19-518"X 5-1/2"XO MLLOUT EXT Z 10198' H9-5/8"X 5-1/2"BAKER FB-1 PKR Minimum ID =2.75" @ 10861' 10217' H9-5/8"x 5-1/2"XO MLLOUT EXT 3-1/2" OTIS XN NIPPLE I I ( 10264' _J—5-1/2"OTE XN NP D=4.455" PRODUCTION MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE L 1 10319 8562 40 LB DM( RO-5 0 04/04/90 L 2 10436 8651 40 LB FLWSLV RM - 01/10/16 5-1/2"HES OBSIDIAN CBP(01/04/16) H 10471' 3 10562 8748 40 LB SO RO-5 51 05/10/92 4 10633 8803 40 LB SO RO-5 51 05/10/92 STA#3&4=BELOW OTIS BWD PKR @ 10507' 11 10507' H9-5/8"X 5-1/2"OTIS BWD PKR 11 10528' —19-5/8"X 5-1/2"XO MLLOUT EXT 10645' --1 BAKER N-1 CEP .rt Z 10652' H9-5/8"X 5-1/2"OTIS WD DERMA-DRLL PKR 10720' —5-1/2'AVA BPL NPSLV W/2-13/64" HOLES,D=4.223' 5-1/2'TBG-PC,17#,L-80,_0232 bpf,D=4.892" H 10782' MI �� 10771' --9-5/8"X 5-1/2*OTIS WD PB2MA-DRLL PKR TOP OF 4-1/2"TBG-PC --10782' / 10782' —15-1/2"X 4-1/2"XO PERFORATION SIJNIM RY REF LOG:BHCS ON 08/04/77 ANGLE AT TOP FERE:40°@ 10390' Note:Refer to Production DB for historical perf data I 10819' —4-1/2"AVA BPL NPSLV SIZE SPF INTERVAL Opn/Sqz DATE W/2-15/64'HOLES,D=3.7" 3-1/8" 4 10390-10420 O 09/10/84 3-1/8" 4 10436-10466 O 09/10/84 3-3/8" 6 10512-10532 O 06/27/03 3-1/8" 4 10523-10543 O 9/10/894 — 10842' J9-5/8"X 4-1/2"OTIS WD WIRELINE SET PKR 3-3/8" 4 10560-10622 O 03/21/90 3-3/8" 4 10633-10645 O 03/21/90 / ( 10$4.4' 1--14-1/2"X 3-1/2'XO 4 10667-10707 C r 11/19/77 4 10740-10754 C r 11/19/77 ______________....- 10851' —3-1/2"OTIS XN NP W/XXN 4 10808-10828 C r 11/19/77 4I NO-GO PLUG,D=.001" 4 10850-10869 C r 11/19177 3--3/8" 4 10880- 10915 C 04/06/84 \�� 10853" -j3 1/2"TTL W/oTIS WLEG 4-1/2"TBG-PC, 12.6#,L-80,.0152 bpi,D=3.958" H 10844` 11 10848'J—{ECMO TT LOGGED 05/22/89 TOP OF 3-1/2"MG-PC —1 10844' 10992' SH-(2)CBNIT2ALIZERs&(2)SgVCER BARS I 10853' 1411111111 -1 ASH PB7D 3-112"TBG PC,9.2#,N D — 80,.0087 bpf, =2.992" 11114111 11111111111 9-5/8"CSG,47#,N-80,D=8.681" H 11049' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/22177 ORIGINAL COMPLETION 01/10/12 TMN/JMD ADDED FQS SAFE!Y NOTE WELL: 09-14 04/04/90 LAST WORKOVER 01/12/16 GJB/JMD SET CBP(01/04/16) PERMTNb: 1770250 09/02/02 BHC/TP PERF CORRECTIONS 01/12/16 MGS/JMD WFR GO(01/10/16) AR No: 50-029-20249-00 06/27/03 BJIWKK ADPERFS SEC 1,T1ON,R15E 4040.15'FEL&1180.14'FNL 11/07/09 RCT/SV NUJ D CORRECTION 02/11/11 MS/JMD ADDED SSSV SAFETY NOTE _ BP Ecploration(Alaska) OF 7.44, • • THE STATE Alaska Oil and Gas 4'1 4 of® T Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ®FALASV'. Fax: 907.276.7542 2-81 www.aogcc.alaska.gov Mark Drotar �p 51 DE Production Engineer BP Exploration(Alaska), Inc. O �1 P.O. Box 196612 d`� Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-14 Sundry Number: 315-673 Dear Mr. Drotar: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, at y P oerster Chair DATED this 2S ty of November, 2015 Encl. 4L RBDMS DEC 012015 STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION CO SION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations Q ., Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ❑ Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 177-025 3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0 99519-66126. API Number: 50-029-20249-00-00 Stratigraphic 0 Service Q - 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No Q PBU 09-14 Cm a 9. Property Designation(Lease Number): 10. Field/Pools: OCT 2 8 2015 ADL 0028327' PRUDHOE BAY,PRUDHOE OIL - L 11. PRESENT WELL CONDITION SUMMARY AOGCC Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11080 9146 10645 8812 10645 10992 Casing Length Size MD TVD Burst Collapse Structural Conductor 76 20"94#H-40 33-109 33-109 1530 520 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment See Attachment See Attachment See Attachment Packers and SSSV Type: See Attachment Packers and SSSV MD(ft)and TVD(ft): See Attachment No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal 0 13.Well Class after proposed work: BOP Sketch 0 Detailed Operations Program Q Exploratory ❑ Stratigraphic 0 Development 0 Service Q 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil 0 Gas ❑ WDSPL❑_,/ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG Iii R .)74bandoned 0 767. Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Drotar,Mark Email Mark.Drotar@bp.com Printed Name Drotar,Mark � Title Production Engineer rk/Signature10.4 /��// Phone +1 9075645367 Date /0/ -q/po's COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number:2 /1 -- r 3 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test El Location Clearance ❑ 1`I//V Other: Spacing Exception Required? Yes 0 No DI Subsequent Form Required: I CI,—4.-1`1 C' 41 PAPPROVED BYTHE � Approved by:067 4_ 4.44......._ COMMISSIONER COMMISSION Date://-2S—/5 ) ,���,� �� �'-�_„= RBDMS DEC 0 120150RIGINAL "I Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate `/ 4._ ,C. i'—'4e.; TREE= FMC GEN 1 WELLHEAD= FMC • illiFETY NOTES: H2S READINGS AVERAGE 125 ppm ACTUATOR= AXELSON 09-14 WHEN ON MI.WELL REQUIRES A SSSV WHEN ON • KB ELEV= 54' MI. BF ELEV= ? KOP= 3007' Max Angle= 46°@ 6739' ® 2196' —17"CA MCO BA L-0 SSSV NIP, ID=5.937" Datum IA)= 10700' Datum TVD= 8800'SS 13-3/8"CSG,72#,MN-80,ID=12.347" H 2712' 1 9933' J—T'X 5-1 12' XO J 7"TBG PC, 26#,L-80,.0383 bpf,ID=6.276" H 9933' 9944' —I9-5/8"X 5-1/2'OTIS BWD PKR TOP OF 5-1/2"TBG-PC — 9933' 22 9967' --19-5/8"X 5-1/2"XO MILLOUT EXT Z 10198' —19-5/8"X 5-1/2"BAKER FB-1 PKR Minimum ID =2.76" @ 10861' , 10217' —19-5/8"x 5-1/2"XO MILLOUT EXT 3-1/2" OTIS XN NIPPLE I \`l:' 10264' —5-1/2"OTIS XN NIP, ID=4.455" ( r 1 1`I F."-tS PRODUCTION MANDRELS I ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 10319 8562 40 LB RO-5 +L'-.' 51.-6EV. L caiw0> 'r 2 10436 8651 40__. LB R0-5.. __"_ ____.__`_ t _ 3 10562 8748 40 LB RO-5 4 10633 8803 40 LB RO-5 /U11 10507' —I9-5/8"X 5-1/2"OTIS BWD PKR I ' 10528' —I9-5/8"X 5-1/2"XO MILLOUT EXT 1 ► 10646' HBAKERN-1 CIBP g 10652' —19-5/8"X 5-1/2"OTIS WD PERMA-DRILL PKR 1 10720' —5-1/2"AVA BPL NIP SLV W/2-13/64" HOLES,ID=4.223" 5-1/2"TBG-PC,17#,L-80, .0232 bpf,ID=4.892" H 10782' 4--,.. 10771' —19-5/8"X 5-1/2 OTIS WD PERMA-DRILL PKR TOP OF 4-1/2"TBG-PC H 10782' 1--------N 10782' H5-1/2"X 4-1/2"XO PERFORATION SUMMARY REF LOG:BHCS ON 08/04/77 n ANGLE AT TOP PERF:40°C@ 10390' Note Refer to R'oduction DB for historical perf data / 10819' 4-1/2"AVA BPL NIP SLV -g _. .INTERVAL._..._.0pn/Sga---.._ {a _ qT�-. +Q° W/2-15/64"HOLES,ID=3.T' �E. -_.. _.-. (.1_ 3-1/8" 4 10390-10420 0 09/10/84 3-1/8" 4 10436-104% __„___Q_______ 09/10/84 3-3/8" _. 10512- 10532 0 06/27/03 3-1/8" 4 10523- 10543 O 9/10/894 ��� 10842' —19-5/8"X 4-1/2"OTIS WD WIRELINE SET PKR1 3-3/8" 4 10560-10622 0 03121/90 3-3/8" 4 10633-10645 0 03/21/90 10844' H4-1/2"X 3-1/2"XO 4 10667-10707 C r 11/19/77 4 10740- 10754 C r 11/19/77 10851' {3-1/2"OTIS XN NIP W/XXN 4 10808- 10828 C r 11/19/77 18 /NO-GO PLUG,ID= 001" 4 10850- 10869 C r 11/19/77 3-3/8" 4 10880- 10915 C 04/06/84 / 10853' —13-1/2"TTL WI OTIS WLEG 4-1/2"TBG-PC, 12.6#, L-80, .0152 bpf, ID=1958" H 10844' ' 10848' -H ELMD TT LOGGED 05/22/89 TOP OF 3-1/2"TBG-PC H 10844' 10992' FISH-(2)CENTRA LEERS&(2)SINKER BARS 3-1/2"TBG-PC,9.2#,N-80, .0087 bpf,ID=2.992" JH 10853' .11111111111111111111. 11 7' --/PITO 9-5/8"CSG,47#,N-80,ID=8.681" J-- 11049' 'i1i1i1i1i1i1i1i1i1i1i DATE REV BY COMMENTS DATE REV BY COM RENTS PRUDHOE BAY Ut'T 08/22/77 ORIGINAL COMPLETION 01/10/12 TIM/A/0 ADDED I-(2S SAFETY NOTE WELL. 09-14 0 LAST WORKOVER PERMIT No. 1770250 09/02/02 BHC/TP PERF CORRECTONS AR No 50-029-20249-00 06/27/03 BJMIKK ADPERFS SEC 1,T1ON,R15E 4040.15'FEL&1180.14'FNL 11/07/09 RCT/SV MN ID CORRECTION - 02/11/11 MI3/JMD ADDED SSSV SAFETY NOTE BP Exploration(Alaska) • 41) a) Q,o 0 0 0 0 0 0 0 0 0 0 co (NI N- CO Cfl CO CO CO r CO CO CD in - in CO O N- O N- O cr N N LC) O O N LO d' LC) L() LO CO CO I- U N 0 0 0 0 0 0 0 0 0 0 0 i M M LC) N- LC) N- LC) V V I- CO 7 L1) 0) r CO r CO r N N-CO r CO CO CO CO 00 N- N- N- oo L() O O co 00 Ln CA d' Or LC) r C3 N N CO .4:rr CO f� O Ln CO LO CO r N CO 0) 0) O N N N- CO CO 0) 00 CO CO CO CO I i i i a i I- O C)) OO CO LO 0) O LC) CO CO r LC) r C3) N CA C0 r r CO CO CO CO LC) (.0 LO (O N N CO 0) 0) N N- CO CO 00 CO CO CO O LnO CO O LC)M 0) Ns LC)CD LC C) O I� L() co O O co N- CO CO N C)) O O r 0 0 ONC r r r r r r r C.) 111111111111 4.0 N QM O L[) O Cfl LO LC) LC) CO r LC) O v. O CO LU N-- (C;) co 0 N M M N O O N O O O Or r r r r 0 � J � Q o LO 'nLO O O 00 0) 0 O C O o) O co 0co 0 Z Z CO -I -I -I EC Et CL 4t 4,k •� N N * N CO - -00 N N N CV U Go CO OJ CO Ln CO Fs_ rr � chCN C� O Lo in Lf) L[) () 0) 0) 0) t C N 0)) LO N- CM c CO O in L1) N .zt ' t[) J N N CO r CO O I� Z Z Z Z Z 0)0 00000 C WHHI-- F- 1— '7) 0000000 La O < O O O : : O O O O U O LL, O O O 0 0 Z Z Z Z Z Z Er0 0 0 0 0 m m m m m ODIYCCCCCLCCDDDDD U (/) 0_ a. 0_ 0_ I- E- HH • • o N CC _ m C) N O to Nr UP 01 Co c- d0) C) I� O ONO N CD M CO '- Co 6) II O 4 O N Ch r-: ;-0. N O V to to r- N N N CA to O N 06 06 N 00 N c- N M I` CO O O C) O O H .- 01 00 to O) 01 LO O T- C) Co Co I- O C` I,- 66 N- ti N- ti Co Co CO CO CO CO co Co CO 0 CD O O OD OD CO CO CO CO Co CO co Co Co CO CO Co Co Co Co Co CO Co CD 0. 0 F- CO C`') to CD CA N N- d' ,- CD CO 01to N N '• C'�) to Y Co N COO to N- to M toc- CDM N- OOOCOO CA OO QtC) ,- OON COO N I� on Ntotor- NNN �rMN6N 0 ., to O N v N- N- OO Co 000 r- O00Cr) OO 'tCDCA LU CO CO N- N- CO N- N- N- r` Co Co Co Co O CO Co Co CA CD CD > O 0 CO CO 0 O CO CO O O CO O CO O O CO Co O CO O Co O O O 0 i>- W Ci! 10 W W Z N W W 0 0 0 Cir Y J 0LU [n to to 1.0to t() t LO o to to to co cn WJ CY 0 0 t CO CO CO O N LO f) t O CV 0) to fa 0 N U U I-W W W +r NCON CO V' O Ln 0014N0f- 4Nt Lo NOtoc- NCOc- J J J Q Q Cn CC 4.0 O. v ,r to to to CO O O c- c- Co Co ch CodN- N- N- N-- Cp VCo co CO CA Q < Q W a a Z C 0 0 0 0 O O Co Co Co Co O Co Co Co O Co Co Co O O O O O O U U 0 _J LU W 0 J 0 w c- r T- T- r c- C) O O o ,- 0 0 0 ,- O O O J J W c- V- r- r- r V V a- V- r r Q Q Q Q 6' d a d E y 1 = I Z < F E 0 0 0 W & ag Z 0 Z N 2 2 LU LU 0 (0 uv ~) a) co 0)) ,4-,• Co) QCa N p O ~ LO 1.0 LO C L O CON CO N O N 0 0 to 0 Ch O O• (C) N- C) Co CO O O O QCA00 — N C7 CO 00001Ch0N- 4 V CO NNr c) up op O J 0 c0Nttntntotncpoo � V- c000 04apQD - NN- ao000oCo ) 0 0 0 0 0 0 0 0 Co Co 0 0 Co Co 0 0 0 Co Co0 0 0 0 0 ;700 co o000 .- Ooo ,- ,- oO N- ,- CC L < N O 2 Ir co to ce t - 0cco0) a) cin0) a y 730 U c ° 0UU- U00000000000Cl) (n (/) U) (/) (1) cn (/) (/) 176 F- F- d a. F- F- F- F- F- F- F- F- F- F- F- a CL a. a a a a a d aQ cncnQcncncn0) 000) ) cncnOOD mmmmmmmmm 0 t d a Cu I- 76 00 01 CO N N N N N N N N N D D O o 0 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 0 C) J` .7 Q O O CA ER CA Egg ER CA CA O (A O O c O O O O O C) 6) CA CS) C3) CS) CA CA C) C_ CA V- C) O) C- CA C) C7) CS) W J J Z '43p N N N �- r O a a W W V N LL R 4 NTN N N d- - T- r- r- r- r- r- T- 'LIJ _u0 W Cr Sr QD CO N Nt Nr Nr d' V. v- d V' in in in in in in in Z a O J 0 0 W W W tL W 0 Sr 0 0 CO 0 in 11') In to in O L17 in CO a _1 _ W J J 3 .7 0 CC fl W W Q ¢ mamcn ti tI ;na cn a a m E ca zv V- ,- V- vvTV' vvvv �rvvvv- vv �rNrvv 5j V- V- V- V- V- V- c- V- V- V- V- N.. N V.. c- t- c- r - V- L.L. a CO 0 LL N CC IL 0 0 0 0 0 t37 O O W 0 0 0 0 0 0 ()) O O (}) O O CA O O a s a a U J 0 0 W a OOOOOOOOOOOOOOOOOOOOOOOO < < CO a) U- it cn cn a CC • • Packers and SSV's Attachment ADL0028327 SW Name Type MD TVD Depscription 09-14 TBG PACKER 9946.8 8274.06 5" Otis WD Packer 09-14 TBG PACKER 10200.28 8470.37 5" Baker FB-1 Packer 09-14 TBG PACKER 10509.4 8707.66 5" Otis WD Packer 09-14 TBG PACKER 10655.1 8819.46 6" Otis WD Packer 09-14 TBG PACKER 10773.62 8910.42 6" Otis WD Packer 09-14 TBG PACKER 10844.69 8964.95 5" Otis WD Packer • ALASKA WELL IfAVITY STATEMENT OF REQUIREMENTS (V1.9,DBR,LHD,EAZ 01/15/15) General Information ( Well Name: 09-14 Well Type: Water Injection Well API Number: 50-029-20249-00 Well Activity Conventional 4 Classification: Activity Description: WSO Cost Code/AFE: APBINJEC Field/Reservoir: PRUDHOE IVISHAK 12 Month Avg IOR, bopd: Job Type: WSO-Plug Estimated Cost, $K: AWGRS Job Scope: PROFILE MODIFICATION Other regulatory None requirements? Sundry Form 10-403 Required? No — Sundry Form 10-404 Yes PrimarySecondary Required? Engineer: Mark Drotar Contact numbers: (907) 564-5367 (720) 201-8829 Well Intervention Engineer: Ryan Thompson Contact numbers: (9071 564-4535 (907)301-1240 Lead Engineer: Bernhard Stechauner Contact numbers: (907) 564-4594 (907) 360-7485 Date Created: September 28, 2015 Revisions(date,who,what changed): Current Well Status Information Water Rate or Gas Rate or FTP or Injectic Oil Rate In) Rate Gas Injection GOR Gas Lift Rate Date (bopd) (bwpo)Water Rate (scf/stbo) Choke Setting (Mscf/Day) Pressure Cut )%) (Mscf/Day) (psi) 9/16/2015 0 1,892 Current Status: Operable Shut In Inclination>70°at Depth(ft) N/A Maximum Deviation(Angle and Recent H2S (date,ppm) NA 0 ppm Depth) 46° 6,739' MD — Datum depth,ft TVDss 8,800' TVDss Dogleg Severity(Angle and Depth) 10° 2,840' MD Reservoir pressure(date, 7/4/2001 3,289 psi Minimum ID and Depth 2.75"Q 10,851' MD psig) Reservoir Temp,F 150° F Shut-in Wellhead Pressure 1,750 psi Known mech. integrity 2 leaks confirmed from tbg spool alignment pins on 5/27/10. problems(specifics) Last downhole operation(date, 12/17/2009 Pulled 7"DBP DSSSV from 2196' MD operation) Most recent TD tag (date,depth, 7/14/2004 10,606' MD 3.25" Cent. &S. Bailer toolstring OD) Surface Kit Fit-for-Service? YES If No,Why? Comments,well history, Well is high rate injection well, putting most of its injection into the Z3. It is believed that this water background information, injection is pushing MI injection away from 09-35, and injecting into Z3 is likely watering out offsets, and etc: not provi much, if any benefit. _____,L_____.---------------------------- The goal of this program is to set a plug and open the GL Mandrels to force injection into Z4 to better support offset producers. Precise depth control is not critical for plug set, so can be set on SL. Tie-in log shows good section of pipe between 10,460 and 10,440' MD where the plug can be set. • Well Intervention Details • Suspected Well Problem: Poor injection conformance. Specific Intervention or Well Objectives: 1 Set Composite plug 2 Pull Dummy GL valves and replace with injection valves 3 Key risks,critical issues: Mitigation plan: 1 No drift in 10 years, likely Schmoo buildup Pump SBG prior to job to insure of good plug set 2 3 Summary Service Line Activity Step# 1 F Pump SBG 2 S D&T. 40 arm caliper. B&F at WSL discretion. Set CBP 0 10,450' ELMD. Set flow sleeves in Sta. 1 and 2. 3 Detailed work scope(If no RP/SOP exists for the intervention type,a well-specific procedure is required in addition to the SOR): 1 F Pump SBG and treat both the FL and wellbore, as per attached pumping schedule Drift and tag CIBP Q 10,625' ELMD with Centralizer/Sample Bailer. Run 40 arm caliper from CIBP to surface. Brush tubing Cc?WSL discretion if evidence of Schmoo in wellbore. Set Composite Bridge Plug 0 2 S 10,450' ELMD. Utilize tie in log attached, noting CIBP on log is at 10,625' (AWG RS 6/28/2002). Tagging the CIBP and pulling up hole -175'taking into account the distance from bottom of plug to seals should put us on depth. Change out the GLVs in the top 2 stations to flow sleeves for water injection. 3 Performance Expectations(may be NA if no change anticipated due to the intervention) BOPD: MMSCFD: BWPD: Expected Production Rates: FTP(psi): Choke setting:I Post job POP instructions: POI immediately after SBG or get tubing and FL freeze protected. Attachments-include in separate excel worksheets Required attachments: Current wellbore schematic As needed: Perf form,logging form,well test chart,annotated mini log,annotated log section,tubing/casing tallies,Wellhead info,etc Approvals Management Approval: Date: Wells Approval: Date: • }�� ppi�tt • Injector c ��a �c of El �G�rhl�g a Minitog 1P07"22'04 PR{3F run fits}a Pro c#,PBU_0 c # rsa i g a ell: 09-14 9-1 ft7`22 9 /04,00( Laura J.Larson Sc a 1.700 ,a sr s Data 4131201$ Irs Owl"' u rasa o 01740.+4 NISI° wx +taa 0004°44.730 sok oe ssw err cnon anu arxn ocav I t Cis cta X#it 1 ti'x; 1 rvass ► Notes alk ,x ..., . 1/4,\,,,,,t,,,,‘,.: '''',::' E iii CAL a � 1„4,k4--,51 ata orr rv*$s sw ver*, ...,,$,1 , '� f.r.V..�III +/ :. .„..rl,i11Y`Ia��Wi'ilM:�ilt'Ya`J�I�i�II III � a � t x v, z� v ,....... • a ...x t�itrllRt+�t WF M rel Packer bind ,{ ill1 t I Peds dxoa�l y � 06.1.V WF i . $7+a Mandrel "< 100/6 at° ti i.a a 27P-42P ,,.\,,,.,,‘.:!,1:,:::' 7,'''',‘.‘„,::::,..,,,.'.1s:,\::: 4Gl.V WF r I t Mandrel 1:111'....':--s" ail I Packer.. ° t CIBP tinform! 1 I> Y 4 .,,,,,Z""1111- ,!*'''.',',:;.';‘.,'.i...'.',,,,,,`,7„,‘.""".!!!`,....,,q' amo tt5J1i��2 Packer b nd 1 PoPe iOlfl' kl. � ._ .. II — ��. c 11940 { ir....,A.,„,;:,,, _,,,,, dui '.„.- .....011.--- :::;:::::''C''''''','•'''..I':%..'':::ill..:;....i ..\*.:' •. rL 1... I •_ rvr ilii III ii ' i i . . I • . . ScIumberger . . Ccav,Dany BP EXPLORATION (ALASKA), INC. vVe'.: DS 09-14 . Fieic. PRUDHOE BAY ( . . Borough: NORTH SLOPE State: ALASKA INJECTION PROFILE WI TEMP SURVEY I c.-.; i PSP/ PILS/ FBS 28-JUNE-2002 . , -,... . , 1 111? FS1& 125' FWL •,-, i 54 ft A- SURFACE ev. K.Ek. G L. 16 ft .,.. • - D f-. 54 ft 1--- - Permanent Datum- MSL Elev 0 tt OD --1 log Measured From. KB 54 0 ft move Perm. Datum I :--, L L"-• Drilling Measured From KB cl _ API Sena' No Section Township Range .t. .,.; -4•,.) 0 [ ... 5. 0 50-0N-2024.9(X) 1 10N 15E • ,oribing Date 1 26-J On-2(0? i 0u' Number 1 ")eptti pf HIer 10640 ft :•;chlurnbercier De.ph 10675 ft Bottom Lbtlinterv4 10624 ft T up Log I nterva 10250 ft ,-asind Fluid type INJECILD FLUIDS ,alinity FINAL Den s ty ,qig Level BMGASINCi70111NCi STRING I Bit Size 12.250 in 1 m sina T.Ibing Size A/clot"! ' 7 itx 't , • Recorded Temperatures 1'22;:tedt 13 • • • a. 4 _ f It _._....-, ..»--....._�.......,.-»......... F. MJF .... . —tern im. .,..... — ot _... AINII 111 iriiiii/W4M/ifi i. MIir— MIN 10400 MN i .. -1 ._.,. .tle A. i —,„— -_. _ --•-- -•.T_.«-.........-_....-..-..........._. — --1- ME mi I , , ii - • ........- ,......: :.. _. _ 1 _ i .,. ..... ♦ -A—..,.y.,.. ..i .. 4 iiiiiiMilailll Plug Set Depth:10450'MD - , , Perforations:10,436'MD-10,466'MD — (Behind Pipe) MIKIM k ``�.-`'�",a hilt MI 111111 II \- - -.NEW— r.._ 4 14540 4 ---�._.. _,_ _ �+ , _ , , _ _ , • _• t------44 I Nt a 1111 111 ... 1.79_.NI .._......_.._ _ MO ....._.. ,. • • • • r 10500 , iI . ... ,- ...., ..i ..„ts, •I' ...., ' ,.-,,,-eaee. .....4.tr........... 4 4 or 1,- ..--- ..„-..- 4.- . .. . • . .- . ---. LI .....-.. ) ... 1111114. # • l 1 - • — \• , • • y• ... -..- • , loY, • • •.'"-. 1.--1,-• .-- - • • • - ... k __A r- ;04 Y''". i • a ..*, 9- 41 tli.. ,...:"----. .........- .--;"... ... .,... ..., m. Lo.., -.....--...„-....„„...- . ,., - • , 1 IV 4 V 4 • • Asa 1 • 4 4- '.4-• , , - 4 4 - 4^ 4 ^•^-,,,*-- 4 ir .,.., ,-.-....--...---..--..---.--«. f .... .,.. 9-- -9- , , "... -,- ,--..... --.• ,.--......---......-..--, ..i.••• ,...• •• , * , lihn. ,Pr ... - _..........— .............— , ...,... — _... 4. k 1 4 ...- -... --, AI ---, .....—* , • I' s .... 10600T ' f 4 ....I : • • • . ,,_„. 6,,...^,... 09- ..n • . -a. ,, .,•,.. ,-....- '•;-..----- i ' —.----"'---• -" GLM , .......... . , ,.... . irk \- cl. _.P'' . ... ...... -.....,....1_,....„ - -,'- .1 SP _ ..........-4, SPEED 80FPM UPIPO2CVL).... SPIN 80 FPM Opi.P02SPIN) _ — ... (F MN) -200 10 (RPS) •40 *ED SO FPM DOWN(POICV9 SPIN 30 FPM DOWN(P0111p1N)_ ................_...•........ • (F,MN) 200 -40 (FIPS) 10 .. __. CCL 1011(p01CCL) (V) i nms-flay1011(POILGR) (GAR) 100 bp RECEIVED 0 AUG 21 2014 AOGis'`i BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA LOG DATA) Date 21 -Aug -2014 Transmittal Number: 93373 If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents SCANNED 1 CD-ROM Containing OPEN HOLE Digital Log Data: 01-14, 03-20, 04-03, 04-091, 04-10,04-241 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-161, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-111 B-241 B-25, C-10, L2 -07A, 0-02, M-04, M-05, U-14 The information on this CD is to be used for BP Exploration (Alaska) Inc. business only. If you are not the owner or licensed user of this CD, any disclosure, copying or use of the information on this CD is prohibited. If you obtain this Angela K. � � CD by error, please return the CD to the address shown g below. BP will pay the postage. Thank you. Please Sign and gancpdc@bp.com j Doug Dortch Petrotechnical Data Attn: State of Alaska Attn: Makana Bender 333 W. 7th Ave, Suite 1 Anchorage, Alaska 99501 If found please return CD to: BP Exploration PO Box 196612 Anchorage, AK 99519-6612 CD1of1 by 0 :or External Distribution P° BPXA OH Log Data 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-11, B-24, B-251 ; C-10, 1.2-07A, 0-02, M-04, M-05, U-14 18 -AUG -2014 Petrotechnical Data enter R2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 177-077 183-101 171-005 176-030 176-042 185-301 175-073 175-062 200-102 175-076 176-016 176-035 176-040 176-047 176-070 176-076 176-082 176-084 177-007 177-008 177-025 177-036 177-037 177-038 177-039 177-040 177-041 181-110 185-204 171-038 178-069 182-140 182-151 179-035 204-053 186-154 171-023 176-110 193-100 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To Jim Regg z, 1 z� DATE: Tuesday,June 04,2013 P.I.Supervisor ��� '' SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 09-14 FROM: Bob Noble PRUDHOE BAY UNIT 09-14 Petroleum Inspector Src: Inspector Reviewed By: P.1.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 09-14 API Well Number 50-029-20249-00-00 Inspector Name: Bob Noble Permit Number: 177-025-0 Inspection Date: 5/31/2013 Insp Num: mitRCN130604070723 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well, 09-14 Type lnj W 8272 IA 1076 2520 2514 ' 2514 ' PTD 1770250 - 'Type Test SPT'Test psi 2068 OA I 240 1 355 370 389 - Interval 4YRTST P/F P ✓ Tubing 966 - 967 966 965 - Notes: • SCANNED FEB 2 0 2014 Tuesday,June 04,2013 Page 1 of 1 • MEMORANDUM To: Jim Regg ~~ .7(wl ~ ~ P.L Supervisor ~~ FxoM: Chuck Scheve Petroleum Inspector ~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, July O1, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 09-14 PRUDHOE BAY iJNIT 09-14 Srr. Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~~~ Comm WeU Name: PRUDHOE BAY IJNIT 09-14 Insp Num: mitCS090630090017 Rel Insp Num: API Well Number: 50-029-20249-00-00 Permit Number: 177-025-0 % Inspector Name: Chuck Scheve Inspection Date: 6/28/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 09-14 Type Inj. W TVD 8z~2 IA 3so 22io ~ zzoo zzoo ~ P.T.D 1770250 TypeTest SPT Test psi 2068 ' QA 240 400 390 390 Interval 4YRTST P~ P ~ Tubing 870 870 870 870 Notes: ~rr a~M~i'.w ~.~~ J~ ~~ ~ ~:. ', ~}~l(°~C: •:i~~?,r ~ >.dN;.re> > ._ ~ e_U i.t Wednesday, July O1, 2009 Page 1 of 1 ) State of Alaska MEMORANDUM ) Alaska Oil and Gas Conservation Commission DATE: Wednesday, July 20,2005 SUBJECT: Mechanical Integrity Tests BP EXPLORA nON (ALASKA) INC 09-14 PRUDHOE BAY UNIT 09-14 TO: Jim Regg 'V P.I. Supervisor f\ ¿17' 7(rzfo/ O~; r 11"-O<').Š FROM: J eff Jones Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv .58£... Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UNIT 09-14 Insp Num: mitJJ050719155338 Rei Insp Num: API Well Number: 50-029-20249-00-00 Permit Number: 177-025-0 Inspector Name: Jeff Jones Inspection Date: 7/16/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 09-14 Type Inj. w TVD 8272 IA 550 2200 2190 2190 P.T. 1770250 TypeTest SPT Test psi 2068 OA 590 740 760 790 Interval 4YRTST P/F P Tubing 1500 1500 1500 1500 Notes: 2 BBLS methanol pumped. '6Ci-ìNNfl) /\UG tì !~ 20D5 Wednesday, July 20, 2005 Page 1 of I ~ TREE = FMC GEN 1 WELLHEAD = rvcEVOY 'ÄcfüÄ'fó¡:r;;'""· AxËCso N K£3:" ELï37..;-·····...... 54í' BF.....ELÐJ..·;- ..... ..¿ KOP= m 3007' rvtÎx··Ängíë";"---·4·6 -@ 673'9í' bätüm rviS";" mm. . .... 16700' Datum TVD = 8800' SS 113-3/8" CSG, 72#, MN-80, ID = 12.347" l-i 17" 1BG-PC, 26#, L-80, .0383 bpf, ID = 6.276" l-i /Top OF 5-1/2" TBG-FC 1-1 ) 2712' 9933' 9933' Minimum ID = 4.455" @ 10264 OTIS XN NIPPLE 09-14 . ~ g g f .. 1 ~ ~ I I L L L L g~ 1 1 :8: ::&" I 1 5-1/2" TBG-FC, 17#, L-80, .0232 bpf, ID =4.892" 1-1 10782' 11--.....:8 ITOPOF4-1/2"TBG-PC l-i 10782' I '\ PffiFORA TION SUMMA RY REF LOG: BHCS ON 08/04/77 ANGLEA TTOP ÆRF: 40 @ 10390' Note: Refer to R"oduction DB for his torical perf data SIZE SPF INTERv' AL Opn/Sqz DA TE 3-1/8" 4 10390 - 10420 0 09/10/84 3-1/8" 4 10436 - 10466 0 09/10/84 3-3/8" 6 10512 - 10532 0 06/27/03 3-1/8" 4 10523 - 10543 0 9/10/894 3-3/8" 4 10560 - 10622 0 03/21/90 3-3/8" 4 10633 - 10645 0 03/21/90 4 10667 - 10707 C 11/19/77 4 10740 - 10754 C 11/19/77 4 10808 - 10828 C 11/19/77 4 10850 - 10869 C 11/19/77 3-3/8" 4 10880 - 10915 C 04/06/84 14-112" 1BG-PC. 12.6#, L-80, .0152 bpf, ID =3.958" 1-1 10844' ITOPOF 3-1/2" TBG-PC l-i 10844' 13-1/2" TBG-R::, 9.2#, N-80, .0087 bpf, ID = 2.992" 1-1 10853' 19-5/8" CSG, 47#. N-80, ID =8.681" 1-1 11049' DATE 08/22/77 04/04/90 1 2121 /00 01/10/01 09/26/01 11/25/01 REV BY COMM8'JTS ORIGINAL COMPLETION LA ST WORKOV ffi SIS-SLT CONVffiTED TO CANV AS SIS-LG REVISION RN'TP CORRECTION ()A.O'KAK CORRECTIONS DA TE REV BY COMMENTS 07/01/02 DAC/KAK MANDREL CORRECTION 07/02/02 DAV/K.A.K SSSV CORRECTION 09/02/02 BHCrrp PffiF CORRECTIONS 06/27/03 BJM/KK ADPERFS . \ :8: I D 2196' 9933' 9944' 9967' 10198' 10217' 10264' ST MD 1 10319 2 10436 3 10562 4 10633 10507' 10528' 10645' 10652' 10720' 10771' ) SAFETY NOTES -IPROF SHOWED LEAK @ 10749' ELM ON 10/20/91. 10645 - C IBP SET 05111/92 I-iT' CAMCO BAL-O SSSV NIP, ID = 5.937" I 1-17" X 5-1/2" XO I 1-i9-5/8" X 5-1/2" OTIS BWD PKR I 1-19-5/8" X 5-1/2" XO MlLOUT EXT 1-i9-5/8" X 5-1/2" BAKffi FB-1 PKR I 1-i9-5/8" X 5-1/2" XO MlLOUT EXT I 1-i5-1/2" OTIS XN NP, ID = 4.455" 1 PRODUCTION MA. NDR8..S 1V D DEV TYPE V LV LA TCH PORT DATE 8562 40 LB R0-5 8651 40 LB R0-5 8748 40 LB R0-5 8803 40 LB R0-5 1--19-5/8" X 5-1/2" OTIS BWD PKR I 1-i9-5/8" X 5-1/2" XO MlLOUT EXT I-fBAKER N-1 CBP I 1-i9-5/8" X 5-1/2" OTIS WD PERMA-DRlLL PKRI 1-5-1/2" AV A BA- NIP SLV W/2-13/64" HOLES, ID = 4.223" 1-19-5/8" X 5-1/2" OTIS WD PERMA-DRlLL PKRI 10782' 1-i5-1/2" X 4-1/2" XO I 1 10819' 1-4-1/2" AVA BA- NIPSLV W/2-15/64" HOLES, ID=3.7" I . z z l 10842' 1-i9-5/8" X 4-1 12" OTIS WD WIRELNE SET PKR ~Ð{ I 1 0844' 1-14-1/2" X 3-1/2" XO I I 10851' 1- 3-1/2" OTIS XN NP W/XYJ\J NO-GO PLUG, ID = .001" fJ*D 1 10853' 1-13-1/2" TTL WI OT5 WLEG I r 10848' l-i ELI\iD TT LOGGED 05/22/89 1 10992' I-iFISH - (2) CENTRALIZERS & (2) SINKER BARS I 11007' I-iPBTD I ~ \ FRUDHOE BA Y UNIT W8..L: 09-14 ÆRMIT No: 1770250 API No: 50-029-20249-00 SEC 1, T1 ON,R15E 4040.15' FEL & 1180,14' FNL BP Explo ration (Alas ka) (- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbanonE] SuspendE] Operation ShutdownF[ Perforate[--~ varianceE] Annuar Oisposal['-~ After CasinclE] RepairWellPl Plucl Perforationsr-I Stimulate, Time ExtensionD Other['-] Change Approved Program~--~ Pull TubingF~ Perforate New Poolr-~ Re-enter Suspended WellE~ SBG TREATMENT 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc, Development F~ ExploratoryE~ 177-025 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic FI Service · 50-029-20249-00-00 7. KB Elevation (ft): 9. Well Name and Number: 54,00 09-14 8. Property Designation: 10. Field/Pool(s): ADL 028327 Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. Present Well Condition Summary: Total Depth measured 11080 feet Tagged TD @ 10640' (06/21/2002). true vertical 9199 feet Plugs(measured) ClBP set @ 10645' [~.~¢~ ....... ~" ~, ~ ;;'"'"%,, ,.., Effective Depth measured 10640 feet Junk (measured) Fish @ 10992'. true vertical 8808 feet J U L /.u u.¢ Conductor 102' 20" 128' 128' 40K ~:til 8 ~ (~ Surface 2686' 13-3/8" 2712' 2712' 80K 2670 Production 11023' 9-5/8" 11049' 9122' 80K 4760 Perforation depth: Measured depth: Open Perfs 10390'-10420', 10436'-10466', 10523'-10543', 10560'-10622', 10633'-10645', Open Perfs Below CIBP 10667'-10707', 10740'-10754', 10808'-10828', 10850'-10869', 10880'-10915'. True vertical depth: Open Perfs 8616'-8639', 8651 '-8674', 8718'-8733', 8746'-8794', 8803'-8812'. O.P. Below CIBP 8829'-8859', 8885'-8895', 8937'-8952', 8969'-8984', 8992'-9019'. Tubing: ( size, grade, and measured depth) 7" 26# L-80 TBG @ 9933'. 7" x 5-1/2" XO @ 9933'. 5-1/2" 17# L-80 Tubing @ 10782'. 5-1/2" x 4-1/2" XO @ 10782'. 4-1/2" 12.6# L-80 Tubing @ 10844'. 4-1/2" x 3-1/2" XO @ 10844'. 3-1/2" 9.2#.N-80 Tubing @ 10853'. Packers & SSSV (type & measured depth) 9-5/8"x5-1/2" Otis BWD PKR @ 9944'. 9-5/8"x5-1/2" BKR FB-1 PKR @ 10198'. 9-5/8"x5-1/2" Otis BWD PKR @ 10507'. (2) 9-5/8x5-1/2" Otis WD Perma-Drill PKR @ 10652' & 10771'. 9-5/8"x4-1/2" Otis WD PKR @ 10842'. 7" Camco BAL-O SSSV NIP @ 2196'. 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Avera.qe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing] Pressure Prior to well operation: 22344 1521 Subsequent to operation: 9306 1063 14. Attachments: 15. Well Class after proposed work: ExploratoryF-I Development[~ Service~ Copies of Logs and Surveys run _ 16. Well Status after proposed work: oilr--~ GasF~ WAGE] GINJE~ WIN J· WDSPLE] Daily Report of Well Operations _X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.C. Exempt: Contact DeWayne R. Schnorr I N/A Printed Name DeWayne R. Schnorr ,-, Title Techical Assistant Signature ,,~L..~~~~~ Phone 907/564-5174 Date June2412003 ,, Form 10-404Revised' § NED JUL 0 8 2003 ORiGiNAL 09-14 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/21/2003 SCMOO-B-GONE--SBG: sCrvlOO-B-GONE 06/22/2003 TESTEVENT --- INJECTION PRESSURE, PSI: 1063 PSI: TYPE: PW VOLUME: 9,306 BWPD. EVENT SUMMARY 06/21/03 PUMPED 407 BBLS SBG TREATMENT DOWN TUBING FROM SKID. O6/22/O3 TESTEVENT---INJECTION PRESSURE, PSI: 1063 PSI: TYPE: PW VOLUME: 9,306 BWPD. FLUIDS PUMPED BBLS 5 NEAT METHANOL 337 FRESH WATER 69 SCHMOO-B-GONE 411 TOTAL Page 1 TREE = FMC GEN 1 VVF_LLHE~ D = MCEVOY 09 14 SAFETY NOTES - ,PRDF SHOWED LEAK ACTUATOR = AXELSON m @ 10749' ELM ON 10/20/91. KB. ELEV = 54' 10645 - ClBP SET 05/1 lf92 BF. FI EV = ? m m mmm~~ m m mmm m KOP = 3007' MaxAngle= 46@6739' [~~---- --t 2196' H7"CAMCOBAL-OSSSV"P, ID=5.937" Datum IVD = 10700' Datum TVD = 8800' SS -- 113-3/8"C:SG, 72~,MN-80,1D=12.347"H 2712'J~ ~ ITOPOFS-1/z'TB~-Pc H 9933, ~ ~ 9967' Hg-5/8"XS-1/Z'XOMLLOUTEXT I ~] ~l.___.j 10198' HO-5/B"X5-1/Z'BAKERFB-1PKRI ~ 1021r ~9-~8"X5-11Z'XOMtLOUT~X~ I MinimumlD--4.4$$"@ 10264 ! I I 10:,~, ~5-112"OT~SXNNP.~D=4.4SS"I OTIS X~ ~IP~L£ PROIXIGI'ION M~ N~FI$ j ! ST MD TVD DEV TYPE VLV LATCH PORT DATE mI 10319 8562 40 LB RO-5 m 2 10436 8651 40 LB RO-5 3 10562 8748 40 LB RO-5 I 4 10633 8803 40 LB RO-5 ~ ~ j~ 10507' HO-5/8"XS-I/2"OTISBWDPKRI Ilo528, H9-5/8"X5-1/Z'XOMLLOUTEXTI ~ t 10645' HBAKERN'I CBP I ~ ~,--J 10652' HO-518"X5-112'OTISWDPEI~A-D~LLPKR J5-1,2"TBG-PC, 17#,L-80,.0232bpf, ID=4.89Z'H10782' F'""-~ j PERFOF~IION SUGARY , RI~ LOG: BHC$ ON 08104177 SIzEN°te: Refer to Production DB for historical perfsPF INTERVAL Opn/Sqz DATEdatamI t 10819' /W/2-1H4'l/2"5/64"AVA BPLHoLES, NIP SLViD = 3.7"I 3-1/8" 4 10390- 10420 O 09/10/84 3-1/8" 4 10436 - 1 0466 O 09/10/84 3-1/8" 4 ) 10523- 10543 O 9/10/894 i 3-3/8" 4 10560 - 10622 O 03/21/90 4 10667- 10707 C 11/19/77 3-3/8" 4 10880 - 10915 C 04/06/84 jNO-GO 10848' HELmW LOGGED05/22/80I J4-1/2" TB~PC, 12.6#, L-80,.0152 bpf, J--J 10844' ITOPOF3-1/2"TB~PC ,--j 10844' ~~ :~ 11007'10992' HFISH-(2) CENTRALIZERS&(2)SINKERBARS J~ J3-1/2"TBG-FC, 9.2#, N-80,.0087 bpf, lO=2.992" J'--j 10853' · J 9-5/8" CSG, 47#, N-80,1D =8.681" H 11049' i DATE REV BY COIVNIB',IT8 DATE REV BY COMIVENTS PRUDHOEBAY UNIT 08/22/77 ORIGINAL OO~PLETION 07/01/02 DAC/KAK MANDREL CORRECTION WELL: 09-14 04/04/90 LAST WORKOVER 07/02/02 DAV/KAK SSSV CORRECTION PERMIT No: 1770250 12/21/00 SI,~SLT CONVERTED TO CANVAS 09/02/02 BHC/TP PERF CORRECTIONS APl No: 50-029-20249-00 01/10/01 SI~LG REVISION SEC 1, T10N, R15E 4040.15 FB_ 1180.14 FI~. 09/26/01 RN/TP CORRECTION 11/25/01 DA C/KAK CORRECTIONS BP ~ploratbn (Alas ka) I PERFORATION S UIVlVIARY REF LOG: BHCS ON 08/04/77 ANGLE AT TOP PERF: 40 @ 10390' Note: I~fer to Production DB for historbal perf data SIzE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 10390- 10420 O 09/10/84 3-1/8" 4 10436 - 1 0466 O 09/10/84 3-1/8" 4 10523 - 10543 O 9/10/894 3-3/8" 4 10560 - 10622 O 03~21/90 3-3/8" 4 10633 - 10645 O 03/21/90 4 10667- 10707 C 11/19/77 4 10740- 10754 C 11119177 4 10808- 10828 C 11119177 4 10850- 10869 C 11/19/77 3-3~8" 4 10880- 10915 C 04/06/84 DATE REV BY COIVIV1B',ITS DATE REV BY COMIVENTS 08122177 ORIGINAL COiVPLETION 07/01/02 DAC/KAK MANDREL CORRECTION 04104190 LAST WORKOVER 07/02/02 DAV/KAK SSSV CORRECTION 12/21/00 SIS-SLT CONVERTED TO CANVAS 09/02/02 BHC/'DP PERF CORRECTIONS 01/10/01 SIS-LG REVISION 09126101 RN/TP CORRECTION 11125101 DAC/KAK CORRECTIONS STATE OF ALASKA ~i ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abanon[--I Suspend[--I Operation Shutdown['-] Perforate. Variancer-] Annuar Disposal['-~ After Casin~['"] Repair Wellr'-] Pluq PerforationsC~ Stimulater-] Time Extension [-'l Otherr'-! Change Approved Program[~ Pull TubingE] Perforate New PoolE] Re-enter Suspended WellE] ADD PERFS 2. Operator 4. Current Well Class: '5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. Development r-~ ExploratoryE] 177-025 3. Address: P.O. Box 196612 6. APl Number Anchorage, Ak 99519-6612 Stratigraphic E] Service, 50-029-20249-00-00 7. KB Elevation (ft): 9. Well Name and Number: 54.00 09-14 8. Property Designation: 10. Field/Pool(s): ADL 028327 Prudhoe Bay Field ! Prudhoe Bay Oil Pool 11. Present Well Condition Summary: Total Depth measured 11080 feet Tagged TD @ 10612' (06/25/2002). true vertical 9199 feet Plugs(measured) CIBP set @ 10645'F~,:-~i~l~'i,~EIi'~, Effective Depth measured 10612 feet Junk (measured) Fish @ 10992'. true vertical 8786 feet JUL . . Casing Length Size MD TVD Bur~S[(a 0il "~.q~P,s~0t~:~;,,~.,~.~ ''~ ......... ~i~.~;: .... Conductor 102' 20" 128' 128' 40K Surface 2686' 13-3/8" 2712' 2712' 80K 2670 Production 11023' 9-5/8" 11049' 9122' 80K 4760 Perforation depth: Measured depth: Open Perfs 10390'-10420', 10436'-10466', 10512'-10543', 10560'-10622', 10633'-10645', Open Perfs Below CIBP 10667'-10707', 10740'-10754', 10808'-10828', 10850'-10869', 10880'-10915'. True vertical depth: Open Perfs 8616'-8639', 8651'-8674', 8710'-8733', 8746'-8794', 8803'-8812'. O.P. Below CIBP 8829'-8859', 8885'-8895', 8937'-8952', 8969'-8984', 8992'-9019'. Tubing: ( size, grade, and measured depth) 7" 26# L-80 TBG @ 9933'. 7" x 5-1/2" XO @ 9933'. 5-1/2" 17# L-80 Tubing @ 10782'. 5-1/2" x 4-1/2" XO @ 10782'. 4-1/2" 12.6# L-80 Tubing @ 10844'. 4-1/2" x 3-1/2" XO @ 10844'. 3-1/2" 9.2#.N-80 Tubing @ 10853'. Packers & SSSV (type & measured depth) 9-5/8"x5-1/2" Otis BWD PKR @ 9944'. 9-5/8"x5-1/2" BKR FB-1 PKR @ 10198'. 9-5/8"x5-1/2" Otis BWD PKR @ 10507'. (2) 9-5/8x5-1/2" Otis WD Perma-Drill PKR @ 10652' & 10771'. 9-5/8"x4-1/2" Otis WD PKR @ 10842'. 7" Camco BAL-O SSSV NIP @ 2196'. 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casin~ Pressure Tubin~ Pressure Prior to well operation: 9308 1063 Subsequent to operation: 33729 1590 14. Attachments: 15. Well Class after proposed work: Exploratory[--] Development['-] Service~ Copies of Logs and Surveys run ~ .16. Well Status after proposed work: oilr'-] Gasr"~ WAGE"~ GINJE'"~ WINJ, WDSPL[-~ Daily Report of Well Operations _X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr I N/A Printed Name DeWayne R. Schnorr__ Title Techical ^ssistant Signature ?,~Y~'~,~~,_,~.,, Phone 907/564-5174 Date July01,20.03 Form 10-404 Revised 2/2003 [ 61NAL 09-14 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/25/2003 PERFORATING: DRIFT/TAG 06/27/2003 PERFORAT]:NG: PERFORAT]:NG 06/30/2003 TESTEVENT --- INJECTION PRESSURE, PSI: 1590 PSI: TYPE: PW VOLUME: 33,729 BWPD. EVENT SUMMARY O6/25/03 DRIFT W/3 3/8 DUMMY GUN / SB 171" OAL TAG CIBP @ 10612' SLM POOH. INJECTOR SCHMOO IN SB. RDMO. <<< PUT WELL ON INJECTION >>> 06/27/03 PERFORATED INTERVAL 10512-10532' MD. RIH W/3.375" GUN, 6SPF, 60 PHASE, 20', CCL. CORRELATE TO SLB BHC (8/4/77) VIA SLB INJECTION PROFILE RAN 6/28/02. FIRED GUNS W/WELL SHUT IN, BALANCED. POOH. RDMO. <<< PAD OPERATOR TO RETURN WELL TO INJECTION >>> 06/30/03 TESTEVENT---INJECTION PRESSURE, PSI: 1590 PSI: TYPE: PW VOLUME: 33,729 BWPD. FLUIDS PUMPED BBLS 0.5 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE EQUIP (1 TEST) 0.5 TOTAL ADD PERFS 06/27/2003 THE FOLLOWING INTERVAL WAS PERFORATED WITH 3-3/8" HSD, 3406 POWERJETS, 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10512' - 10532' Page 1 TREE = FMC GEN 1 WELLHEAD= MCEVOY 09 14 SAFETY NOTES - ,PROF SHOWED LEAK ACTUATOR= AXELSON ~ @ 10749' B_M ON 10120/91. KB. ELEV = 54' 10645 -CIBP SET 05/11/92 BF. ELEV = ~. .o~_- ~00~ ~ H MaxAngie=---46(~6-~9,I -- -~ 2196' 7" CAMCO BAL-O SSSV NIP, ID=5.937" [ Datum IVD = 10700' DatumTVD = 8800, SS I~o,o~-,,~',.~-~ H 9933' ,~ ~ 9967' I-I~-~"x~-,,~'xo~.~o~,~, I ~ ~-~1 10198' I--I9-~8"x5-11~'.A.mm-1~RI '-- ~ 10217 ~9-S~8"X5-11~'XOUtLOUT~XT Minimum ID -- 4.455" @ 10264 I I I 10:~0~' l'~5-112"OT~SXUNP.~D--4.455"I OTIS XN NIPPLF PRODUCTION MA NDRELS I. I ST MD 3VD, DEV TYPE VLV LATCH PORT DATE I I 2 1O436 8651 40LB RO-5 ' I 3 10562 8748 40 LB RO-5 4 10633 8803 40 LB RO-5 "~ ~ 10507' HO-S/8"XS-1/2"OTISBWDPKRI r 10528' ~9-s~8-x5-1/~' XOULLOUT~T I ~: 10645' HBAKERN-lCBP I ~ ~~{ 10652' HO-5/8"X5-1/2"OTISWDPERMA-DRILLPKRI II--~{10720'__lHOLEs'HS'l/2"AVABR'NlPSLVw/2'13/64''Ilo= 4.223" .I 5-1/2" TaG-m, 17#, L-80, .0232 bpf, ID--4.892" ~ 10782' [~ lTOPO~4-112"TaG-PCH 10782' I~--~ ~ I 10782' I-t5-112"x4-112'xol PI~FORATION SUMMA RY REF: LOG: aHC8 ON 08104177 t ANGLE^TTO¢ I::~RF: 40 @ 10390' Note: Refer to Rroduc~on DB for hisDrical perf data I I' I 10819' I---~4-1/2"AVABPLNIPSLV 3-1/8" 4 10390 - 10420 O 09/10/84 3-1/8" 4 10436 - 10466 O 09/10/84 3-3/8" 6 10512 - 10532 O 06/27/03 3-1/8" 4 10523-10543 , O 9/10/894 3-3/8" 4 10560-10622 O 03/21/90 ~:~ ~ --~ 10642',.9'5/8"X4'l/Z' OTIS WDWIRELNESETPKR 3-3/8" 4 10633 - 10645 O 03/21/90 /\ 4 10667-10707 C 11/19/77 ~ !, 10844' I--4 I i 114-1/2"X3-1/2"xoI 4 10740 - 10754 C 11/19/77 4 10808-10828 C 11/19/77 I~'~' ~ 10851' H3-1/2"OTISXNNPW/XXN INO-GO PLUG. ID = .001" 4 10850 - 10869 C 11/19/77 I~-~"~°,~.~#,~-~°,-°~~,'~=~.9~'' I-[ ~08,.' i I~°8~8' HELuD'n'L°GGED°5/22/89 I IT°P°F3'I/2''TBG'Pc I-[ ~08'.' t ~0~2' H.,s.-(~)~.~. ~(~)~,.<~..^.~ ~---I· ~oor · 1 3-1/2"TBG-PC, 9.2#, N-80,.0087 bpf, ID=2.992" H 10853' 19-5/8"CSG, 47#, N-80,~D=8.681" I--[ 110~0' DATE R~ aY COmmTS roTE R~ aY COUMENTS mmHOE aA¥ uNrr 08122177 ORIGINAL COI~L~'I'ION 07101/02 DAC/I~I~ MAN[~EL GORREGTIO~ WB.L: 09-14 04100100 I_~$T WORKOV I~ 07102/02 DAV/KAI~ $SSV CORRI~TION I:~RMI'I' No: 1770250 12121100 ~ SIS-SLT ODIWERIED TO C.~N~AS ~ 09102/02 BHC/IP PERF ODRRECIION$ APINo: ,50-029-20240-00 01110101 SIS-kG F~=VISION 0~/27/03 BOM/KK AI~EI:~S SEC1, T10N,R15E 4000.15'FEL&1180.14' 09126101 RN/TP CORRI~IION 11125101 DA~KAK CORRI~IION$ I BP ~xploration {Alaska} PERFORATION SurviVIA RY REF LOG: BHCS ON 08/04/77 ANGLEATTOP PERF: 40 @ 10390' Note: Refer to Rroduc~on DB for hisDrical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-1/8" 4 10390 - 10420 O 09/10/84 3-1/8" 4 10436 - 10466 O 09/10/84 3-3/8" 6 10512 - 10532 O 06/27/03 3-1/8" 4 10523 - 10543 O 9/10/894 3-3/8" 4 10560 - 10622 O 03/21/90 3-3/8" 4 10633 - 10645 O 03/21/90 4 10667 - 10707 C 11/19~77 4 10740 - 10754 C 11/19~77 4 10808 - 10828 C 11119177 4 10850 - 10869 C 11/19~77 3-3/8" 4 10880 - 10915 C 04/06/84 DATE REV BY COrvlMI~ITS DATE REV BY COMMENTS 08122177 ORIGINAL COIVPLETION 07~01/02 DAC/KAI< MANDREL CORRECTION 04100190 LAST WORKOVER 07/02/02 DAV/KAI~ SSSV CORRECTION 12/21/00 SIS-SLT CONVERTED TO CANVAS 09/02/02 BHC/TP PERF CORRECTIONS 01/10/01 SIS-LG F~--VISION 06/27/03 BJM/KK ADPERFS 09/26/01 RN/TP CORRECTION 11/25/01 DAC/KAK CORRECTIONS · STATE OF ALASKA ALASK/ 'LAND GAS CONSERVATION C 'MISSION REPORT SUNDRY WELL OP,-RATIONS_ _ 1. Operations performed: operation shutdown =~.. Stimulate Plugging__ Perforate U~.~ ! GIN~ II Pull tubing ..-.= Alter casing ..--=- Repair well ~ Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1112' FSL, 125' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1608' FNL, 1533' FWL, Sec. 2, T10N, R15E, UM At effective depth 1329' FNL, 1256' FWL, Sec. 2, T10N, R15E, UM At total depth 1297' FNL, 1225' FWL, Sec. 2, T1 ON, R15E, UM 5. Type of Well Development Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 54' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-14i 9. Permit number/approval number 77-25 10. APl number 50 - 029-20249 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11080' feet 9199' feet Plugs(measured) Bridge Plug @ 10645' MD Effective depth: measured 10645' feet true vertical 8801' feet Junk(measured) Casing Length Conductor 80' Sudace 2682' Production 11021' Size 20" 13-3/8" 9-5/8" Cemented 267 sx AS II 6800 sx AS cmt Top job w/150 sx AS cmt AS cnt~ L Measured depth 102' 2712' 11049' True vertical depth 102' 2712' 9175' Perforation depth: measured See attached. true vertical See attached. Alaska Oil & L~as L;ons. Anchorage Tubing (size, grade, and measured depth) 7", 26~, L-80, PCT @ 9933' MD; 5-1/2", 17#, L-80, PCT @ 10782' MD; 4-1/2", 12.6#, L-80, PCT @ 10844' MD; 3-1/2", 9.2#, N-80, PCT @ 10853' MD Packers and SSSV (type and measured depth) See attached. 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 13494 Tubing Pressure 1206 Subsequent to operation 21026 ~''' -- 1861 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~-e~'- ~ ~ Title Engineering Supervisor Form 10-404"Rev 06/15/88 ORt/t .ql W ~.~...o,W . IWP Date ~'"/~'~ ~/~ '-~ , SUBMIT IN DUPLICATE ~, 9-14 Sundry Attachment of Well Data Open Perforations above Bridge Plug: 10390 - 10420' MD (Z4) 10436 - 10466' MD (Z4) 10523 - 10543' MD (Z3) 10560 - 10600' MD (Z3) 10602 - 10622' MD (Z3) 10633 - 10645' MD (Z3) 8606 - 8629' TVD 8641 - 8664' TVD 8708 - 8723' TVD 8731 - 8767' TVD 8769 - 8784' TVD 8792 - 8801' TVD Ref Log' BHCS 8/4/77. Open Perforations isolated below Bridge Plug; 10667 - 10707' MD (Z2) 10740 - 10754' MD (Z2) 10808 - 10812' MD (Z2) 10816 - 10828' MD (Z2) 10850 - 10869' MD (ZlB) 10880 - 10915' MD (ZlB) 8818 - 8849' TVD 8874 - 8885' TVD 8926 - 8929' TVD 8932 - 8942' TVD 8959 - 8973' TVD 8982 - 9009' TVD Ref Log: BHCS 8/4/77. Packers & SSSV: Otis BWD Packer @ 9944' MD. Baker FB-1 Packer @ 10198' MD. Otis BWD Packer @ 10507' MD. Otis WD Perma Drill Packer @ 10652' MD. Otis WD Perma Drill Packer @ 10771' MD. Otis WD Wireline Set Packer @ 10842' MD. 7" Camco BaI-O SSSV @ 2196' MD. 9-14 DESCRIPTION OF WORK COMPLETED BRIDGE PLUG INSTALLATION FOR INJECTION PROFILE MODIFICATION 5/6/92: MIRU & PT equipment to 4000 psi. RIH w/CT & jetted the tubing & liner clean w/1026 bbls 1% KCl Firewater. Tagged bottom at 10922' MD. Rigged down. 5/1 I/92: MIRU CT & PT equipment. RIH with a cast iron Baker 'N-I' Bridge Plug & set plug at 10645' MD (top), to isolate open perforation intervals at: 10667 - 10707' MD (Z2) 10740 - 10754' MD (Z2) 10808 - 10812' MD (Z2) 10816 - 10828' MD (Z2) 10850 - 10869' MD (ZlB) 10880 - 10915' MD (ZIB) Ref. Log: BHCS 8/4/77. Pressure tested Bridge Plug at 2100 psi for 1 hour. Rigged down. Returned well to produced water injection & obtained valid injection rates. // ARCO .~,l~mka. Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 5-29-92 REFERENCE: ARCO CASED HOLE FINALS ~'~ 1-18 5-5-92 Leak Detect R,,n ~ ~/ 2-6/ . 5-11-92 Prod Profile R!~n ~/~ ~ ~ 3-27 / 5-8-92 Prod Profile * 5-10 -~/ 5-7-92 PITS R~_~_n 7-7A 5-10-92 PITS Rl_m '7-9 ~/ 5-8-92 Prod Profile Run 7~"~ I7-9 ~/j 5-11-92 Prod Profile Run ~' ~ 7-13 ~// 5-8-92 Prod Profile Run ?.>~ 9-14 ~ 5-11-92 C_I.B.P. R~_!n f9-25 '/ 5-11-92 Jewelry Run ~-'~g 9-25 ~/ 5-11-92 Inj Profile Run >~/~ 9-32 ~// 5-6-92 Pump-In Spinner Run ~t/~ ~ ! 12-28 '//5-5-92 Prod Profile Run 2~/>~' 14-33~/ 5-7-92 Gas Entry Run 1, 5" 1, 5" 1, 5' 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" 1, 5" Please sign and return the attached copy as receipt of data. RE CEIVED BY__~e~~___~C~-L~ Have A Nice Day! - Sonya Wallace ATO-1529 APPROVED Trans# 9210ga Cal~co Camco Camco Camco C-taco Camco Camco Camco Camco Camco Camco Camco Camco Camco RE.--.CE IVED JUN 08 199;~ Oil & Gas Cons. Commission Anchorago # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO * The correct APl# for 5-10 is 50-029-20263 ARCO ALASKA, iNC. F'.O~ BOX i00360 '--- ANCHORAGE, ALASKA 995. DATE - t t -27-9 REFERENCE' ARCO CASEB HOLE FINALS __ 23 tt-24-9t TUBING CUTTER RUN S9 ii-iT-gl CET RUN ~_~~39 it-tT-9t SF'IN/TEMP INJECTION RUN t S t t-t 6-9t COLLAR-F'ERF RUN .~- 7.-.3 t t-23-9i eCL (F'ERF) RUN -t4 t0-2¢,-9t INJ PROFILE RUN -~i it-24-9i CCL (F'ERF) RUN ~-*S-4 t i-22-9t COLLAR-PE]::F -RUN .~"~4-2 i 0-27-9t PROD F'ROFILE RUN .7413 i O-i 9-9t LEAK DETECT RUN 32 ~e-~8-gJ PROD PROFILE RUN PLEASE SIGN A'~N THE ATTACHED COPY AS RECEIPT OF DATA. SONYA WALLACE DEC 0 2 1991 ~F'F'ROCED~~- AT0-i529 TRAN~ 9t~84 '~8~ Oil & Gas Gens. DISTRIBUTION CENTRAL FILES ~ PHILLIPS CHEVRON F'B WELL FILES D & M R & D EXTENSION EXF'LORATION ~ BPX EXXON ~ STATE OF ALASKA MARATHON ] E,,ACO MOBIL ATLAS SCH ATI_A£ ATLA2' A'¥1_A3 ATL. A3 CAMCO ATLAS ATLAS CAMCO CAMCO CAMCO A R C 0 A I... A ,? I< A., ]; N C., F',. 0,. BOX i C,;3,36C, ANCHCiF.:A(;I::, ALASKA D A T E ' '7 '- i '7 - 9 (-3 iR'. F' F.' E R E:. i'd. C E ' A F;.: C 0 C A,? E T) H 0 L E F T N A L .':':,' ? 9-i4 ':;'-' i 9- '::' ;:" i 4 .... i 7 4 ....i9 4 '-2':? 4- ,'."; ¢ 5"-i4 '.5- i 6 6'-8 ": -- 1/, - 9 () T E H i':' .6-i 9'-9,::':' F'F;:ODU[--:T'-'.'ON. F'ROF'.[L.E /, -'-',.:: (:;, -- 9 ,";) i:" I T S 6 - i -.5 - 9 ,::.," F' R 0 D d C T '.'.[ 0 N P F': 0 F 7 L. E 6 - 2 (:.:' -- 9 ":,.:, ['.;. i:;.: 6 - i 7 -- 96: I N J E C T I 0 r'4 F' R Ci I::' :F. L 6 ..... i 9 --- 9 ¢ :i; i'".J. J ;:."C:"f' i 1'3 N F:' F;.'. 0 F: I 1.. !ii; 6-23-9,::':' iNJECTiON F:'ROF i L.E 6 --. 29 .... 9 ¢ i. N,J E L'; T l 0 NF.' F;,' 0 F ]. I_ Iii; '7-i.-9;5 PRODUCTION. PROF;ELE 6 --' :.'"!; ;.:) -- 9 ¢ F:' F;..' 00 U C 'i" l' ,:"-i i'd. F:' .r.;... 01:r .1: L.. E ~ - :5 ,:.=.:'-.-9 ¢, T E i"i F' S-2-"~--':.'.-;'¢ F'EF;.:F BRL:LAK-DOWN ,:'.::URVEY '=' - ":' ""' - <;' ;.'~ PRODUCTIRN F'R(]F ILE C;) .,;. t : ..- _ 6 .... 2i--'9¢ F'RODUCTTON F:'ROF'II_E 6--;2¢-9¢ L. EAK DETECTION F;,' LJ N I:,: U i'".J. RUN R t.J i'.i I-;: Ij N F;..' t.J i'...I F;:UN i;: U N I:;: I..J N R U N R LJ I';,' I..J i"d. R U i"'4 I;; U i'd. F'LF:A£..'E,...~IGN. F,'IECEIVED BY I.-IAVE: A NICE AN.D RE'f'URN THE ATTACHED COPY AS RECEIPT 0 F' ,'? A L_ L. "T" HOF:F'ECK El:;.'. A T 0 '- i 5 "2 9 I) A Alaska Oil & Gas Cons. D I ~.: T F.: I BUT ]: ON '" CEN i-RAL FILES :~ I:"H i L.I_ I F'.? '"',,.I~_.FtEVRON' ' F:'B WELL. F'I L.E:.? D & M R & D 'ir "'-~ ' - ' ; '"' E,.1 ENS ION EXF:'LORATIOi'-~ ~: BPX ¢- EXXON ~ 3"TA'f'E" OF: ALASKA N~RATHON I'EXACO · ' MOBIL i., i, i, 'i., i, i, i., i, i, i, t, i, i, l;. tl _.:. I:;' II ,...' Lc.' ...;. I:;' ...'.. ..:' I...: (:i I"'l L.: LJ .... i..; ~:4 ;'! t..: t..j C: F~ m"-'! C E[ C F:', r-i C !3 C ~'::'~ m"'i (:: 3 ' ~'..'~ ~'i L; 0 C: f:', I"'i C (": A f'i C L} ...,"' r::'~ H C ri... C r::~ r,i C 0 C A H J":; f3 C A id C: 0 C A t,i C 0 C F4 t.i C 0 STATE OF AL.ASKA AL~oKA OIL AND GAS CONSERVATION COMM,oo,ON REPORT OF SUNDRY WELL OPERATIONS !, 1. Operations Performed: Operation Shutdown Alter casing Repair well Stimulate Plugging m Perforate Pull tubing X Other X Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1112' FSL, 125' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 1608' FNL, 1533' FWL, Sec. 2, T10N, R15E, UM At effective depth 1329' FNL, 1256' FWL, Sec. 2, T10N, R15E, UM At total depth 1297' FNL, 1275 FWL, Sec. 2, T10N, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 54' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number 9-14 feet 9. Permit number/approval number 77-25/90-137 10. APl number 50-029-20249 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical 1 1 080' 9199' feet feet Plugs (measured) None Effective depth: measured 1 1 0 0 7' true vertical 9142' feet feet Junk (measured) None 13. Casing Length Size Structural Conductor 8 0' 2 0" Surface 2682' 1 3-3/8" Production 1 1 021 ' 9 - 5/8" Perforation depth' measured See Attached true vertical See Attached Tubing (size, grade, and measured depth) 7" / 5-1/2", L-80, tbg w/ tail @ 10853'(WLM) Packers and SSSV (type and measured depth) Cemented Measured depth True vertical depth 267 sx AS II 102' 102' 6800 sx AS cmt- 2712' 2712' Top job w/ 150 sx AS cmt 1000 sx Class G & 1 1 049' 300 sx AS cmt 91 75' APR 2 5 199 Alaska Oil & Gas Cons, C0mm/ssJbl '~ ~ch0rage Camco 'Bal-O' sssv @ 2188', Otis 'BWD' pkrs @ 9936' & 10497', 'WD' ~ 10652'(WLM)~ Baker 'FB-I' @ 10190' Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure 14. N/A Prior to well operation Re_oresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Subsequent to operation 15. Attachments *Workover Well History Copies of Logs and Surveys run __ Daily Report of Well Operations X* 16. Status of well classification as: Oil Gas Suspended Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 ~,ev 05/17/89 Title Drillincj Analyst Date SUBMIT IN DUPLICATE Item 12. Report of Sundry Well Operations DS 9-14 continued Perforation depth' 0390'-1 0436'ol 0523'-1 0560'-1 0602'-1 0633'-1 0667'-1 0740'-1 0808'-1 0816'-1 0850'-1 0880'-1 0420' 0466' 0543' 0600' 0622' 0645' 0707' 0754' 0812' 0828' 0869' 0915' TVD 8661'-8683' 8697'-8619' 8763'-8779' 8792'-8823' 8825'-8841' 8849'-8859' 8875'-8922' 8932'-8943' 8985'-8988' 8991'-9000' 9017'-9032' 9041'-9068' REEE]VED 'APR 2 ~ 199~ Alaska 0[i & Gas Cons. Commission Anchoraffa ARCO Oil and Gas Company ,~' Well History- Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to Spudding should be summarized on the form giving inclusive dates only. Di st ri Ct I County, parishorborough ! State ARCO ALASKA INC. J NORTH SLOPE J AK Field ILease or Unit JWell no. PRUDHOE ADL: 28327 DS 9-14 Auth. or W.O. no. /Title AS 3579 J WORKOVER API: 50-029-20249 Operator I ARCO W.I. ARCO 21.00 Spudded or W,O. begunACCEPT IDate 3/2 5~H°ur/90 11 ~Prior status if a W.O,0 HRS Date and depth Complete record for each day reported as of 8:00 a.m. AUDI 4 03/25/90 ( TD: 0 PB: 0 ZR 03 /90 ( TD:i 0 PB: 1007 :ZR 03/ ~/90 ( TD: 0 PB: 1007 SUP' ZR 03/ 9/90 ( TD: 0 PB:1007 SUP'/:ZR 2) 3) 4) PUMPING 100BBL HEC PILL MW: 8.5 fsw MOVED RIG F/DS 3-22 TO DS 9-14. ACCEPTED RIG AT 1100 HRS 25MAR90. RU UP TO KILL WELL. BULLHEAD 450 BBL FSW DOWN ANNULUS @ 5-1/2 BPM. BULLHEAD 300 BBL FSW DOWN TBG AT 5 BPM. STARTING PRESSURE 700 PSI. FINAL PRESSURE 50 PSI. MONITOR WELL. WELL ON VACCUUM. PUMPED 100 BBLS HEC PILL AT 3 BPM AND 50 PSI. FOLLOW W/ 200 BBLS FSW TO SPOT PILL ACROSS PERFS. WELL ON VACCUUM. SET BPV. CONT INJ DOWN ANNULUS AT 3 BPM AND 50 PSI. ND TREE. NU BOPE. PULL BPV. PU LJ. TEST BOPE. PULL TBG HGR TO FLOOR. LD SAME. STRING WT 165K. CONT' PUMP DOWN ANNULUS AT 2 B[~M~W/CHARGE PUMP. DAILY:S85,902 CUM:$85,902 ETD:SO: EFC:$1,250,902 :. TEST 3-1/2" PIPE RAMS MW: 8.5 fsw CONTINUE PUMPING FSW AT 3 BPM AT 0 PSI. SHOT FLUID LEVELS. 550'@ 0730, 550' @ 0800. POOH 15 FULL JTS TBG. FLUID LEVEL 525'@ 1030. CONT POOH. SHOOT FLUID LEVEL AFTER 4-5 JTS OUT. 472' @ 1400. 85 JTS OUT. FLUID LEVEL 325' @ 1820. FINISH POOH. LAID DOWN 245 JTS 5-1/2" TBG PLUS SEAL ASSEMBLY. RD FLOOR. RU TO TEST STACK. TEST STACK. 3-1/2" RAMS FAIL. CHANGE BLOCKS ON 3-1/2 RAMS. TEST 3-1/2" RAMS. DAILY:S28,270 CUM:$114,172 ETD:S114,172 EFC:$1,165,000 POOH W/FB-1 PACKER MW: 8.5 fsw FINISH TEST BOPE. MU FTA #1 AND RIH TO +/- 1000'MD. SHOT FLUID LEVEL. FLUID @ 383'MD. POOH TO PU PRT (MOE ID 6.625, NOT 6.25). PU PRT AND RIH. TAG PACKER @ 10,142'MD. MILL ON PACKER. POOH W/PACKER. PU WT 159K. SO WT l12K. ROT WT 120K. DRAGGING UP TO 233K AT CASING COLLARS. DAILY:S27,136 CUM:$141,308 ETD:S141,308 EFC:$1,165,000 RIH W/FTA #3 MW: 8.5 fsw POOH W/FTA #1. LD PACKER AND TAIL PIPE. CLEAN BOOT BASKETS(NOT MUCH IN BOOT BASKETS). PU AND MU FTA #2 AND RIH ON 3-1/2" DP. FILLING HOLE WITH CHARGE PUMP AT 3 BPM AND 0 PSI. SHOT FLUID LEVEL TWICE IN 15 MIN. FIRST TIME FLUID LEVEL "HELD" AT SAME DEPTH (262'). TAG PACKER AT 10,494' MD. BEGAN MILL JUNK AND PACKER. MILLED TO 10,497' MD. HAD RETURNS FOR FIRST TIME WHILE MILLING. PACKER FELL TO 10648' MD. MIX AND PUMP 100 BBL HEC PILL WHILE STILL HAVING RETURNS. CIRC 1-1/2 HOLE VOLUMES WITH NO HEC RETURNS. POOH W/FTA #2. MU FTA.#3. RIH ON 3-1/2" DP. DAILY:~,~i6 CUM:$168,2'24 ETC,;$I~-~,224 EFC:$1,165,000 The above Signatu re~ For form distribution, see Procedures Manual, Section 10, Dfilllng, Pages 86 and 87. INumber all daily well history forms consecutively as they are prepared for each well. iPage no. %RCC Oil and Gas Company Daily Well History--Interim ~structions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. ,umber all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section wilt be reported on "lnlarim" sheets until final ompletion. Report official or representative test on "Final" form. 1) Submit "lnlerim" sheets when filled out but not less frequently than every 30 days, or (2) n Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. )istrict ARCO A~.~S!"~. INC. lC°unty °r Parish NORTJ'{ SLOPE IState :ield PRUDHOE IL ...... Unit DS 9-14 IWell n°' Complete record for each day while d,~.l~)r ~orkover in progress AK )ate and depth ~s of 8:00 a.m. 03/ TD PB SUP 03/ SUP 04/ TD: PB: SUP 04/ TD: PB: SU~ 04 TD PB SU~ 0/90 ( 5) 0 1007 ':ZR ~1/90 ( 6) 0 ~1007 7: ZR 31/90 ( 7) 0 11007 V: ZR 02/90 ( 8) 0 11007 'V:ZR 03/90 ( 9) 0 11007 V:ZR The abov~ is correct :or formXprepar'ation and distribution ;ee Procedures Manual Section 10, Drilling, Pages 86 and 87 \ \ RIH W/FTA#5 MW: 8.5 fsw CONT' RIH W/ FTA #3. TAGGED PACKER AT 10648'. WORKED SPEAR IN. PU 4K - 5K LBS. POOH SLOWLY W/FISH. LD SAME. PU AND MU FTA '#4 AND RIH. CONT' FILL HOLE AT 3 BPM W/ CHARGE PUMP. CUT 84' DRILLING LINE. SLIP 42' SHOOT FLUID LEVEL. FLUID AT 152'. KELLY UP AND TAG FISH AT 10662' PU WT 167K. SO WT lltK. BROKE FISH LOOSE W/5K OVER PU WT. POOH W/ FTA #4. LD FISH AND FTA #4. PU AND MU FTA #5 AND RIH ON DP. DAILY:$32,0~4 CUM:$200,308 ETD:S200,308 EFC:$1,165,000 POH W/ RTTS MW: 8.5 FSW FINISH RIH 2-1/2" MILL AND 2-1/16" TUBING STINGER. WASH AND WORK MILL THRU STRADDLE ASSEMBLIES. POH AND LD MILL AND 2-1/16" TUBING. PU 9-5/8" RTTS A_ND FO CLOSING FINGERS. AND SET RTTS AT 2627', PRESSURE TESTED THE 9-5/8" CASING AND FO'S TO 3500 PSI - GOOD. POH AND LD FO CLOSING FINGERS. PU SEAL ASSEMBLY AND 9-5/8" RTTS. RIH, LOCATE IN PACKER AT 10,672' AND SET RTTS, PRESSURE TESTED THE PACKER AT 10,672' - GOOD. RELEASE RTTS AND RE-SET RTTS ABOVE PERFS. ATTEMPTED TO TEST 9-5/8" CASING TO 3500 PSI, FOUND CASING LEAK AT 10,130' - 10,160'. PRESSURE TESTED 9-5/8" CASING ABOVE 10,130) TO 3500 PSI - GOOD. RELEASED RTTS AND POH. DAILY:S51,668 CUM:$251,976 ETD:S251,976 EFC:$1,165,000 RIH W/ FB-1 PACKER & STRADDLE MW: 8.5 FSW FINISH POH W/ 9-5/8" RTTS AND SEAL ASSEMBLY. MU STRADDLE ASSEMBLY AND OTIS 9-5/8" 'WB' PERMANENT PACKER. RIH ON DP, LOCATE STRADDLE ASSEMBLY IN PACKER AT 10,672' AND SET 'WB' PACKER AT 10,496'. POH AND LD OTIS SETTING TOOL. MU STRADDLE ASSEMBLY AND BAKER 9-5/8" 'FB-i' PERMANENT PACKER. RIH ON DP. DAILY:S27,004 CUM:$278,980 ETD:S278,980 EFC:$1,165,000 POH AND LDDP MW: 8.5 FSW FINISH RIH W/ 'FB-I' PACKER AND STRADDLE ASSEMBLY. LOCATED STRADDLE IN'PACKER AT 10,496' AND SET 'FB-i' PACKER AT 10,189'. POH AND LD BAKER SETTING TOOL. MU STRADDLE ASSEMBLY AND 9-5/8" OTIS 'WB' PERMANENT PACKER. RIH ON DP. LOCATED STRADDLE IN PACKER AT 10,189' AND SET 'WB' PACKER AT 9,936'. POH AND LDDP. DAILY:S37,602 CUM:$316,582 ETD:S316,582 EFC:$1,165,000 RIH W/ 7" COMPLETION MW: 8.5 FSW FINISH POH AND LDDP AND OTIS SETTING TOOL. LD DC'S, PULLED WEAR RING AND CHANGE OUT PIPE RAMS TO 7". MU SEAL ASSEMBLY AND RIH WITH 7" COMPLETION. (7" / 5-1/2", L-80, TBG, CAMCO 'BAL-Q' $SSV ~ 2188', OTIS 'BWD' PKR ~ 9936'. R~RR 'FB-I' PK~ @ 10190', OTIS 'BWD' PKR @ 10497', OTIS 'WI)' PKR O 10652'(WLM), Fa~T @ IOOS31WL~I~itle DAIL¥:S27~519 / CUM:$344,101 ETD:S344,101 EFC:31,165,000 Drilling Supt. AR3B-459-2-B Number all daily well history forms consecutively ]Page no, as they are prepared for each well. ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "FiNal Report" should be submitted also when operations are suspencled for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and represerttative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. I Accounting cost center code District ICounty or Parish /State Field IL ...... Unit IWe,I no. DS 9_]. ~. I Title PRUDHOE ADL: 28327 Auth. or W.O. no. A$3579 WORKOVER API: 50-029-20249 Operator IA.R.Co. W.I. rrotal number of wells (active or inactive)on thisI ARCO 2 1. ~{~ 0enter prior to plugging and labandonment of this well Spudded or W.O. begunACCEPT IDate 3/2~,~°ur/90 1 tPri°r 'tatus if a w'O'00 HRS Date and depth Complete record for each day reported as of 8:00 a.m. AUDI 4 04/( TD: PB:; SUP~ 14/90 (10) RIG RELEASED MW: 8.5 FSW 0 FINISH RUNNING 7" COMPLETION. FREEZE PROTECTED THE .1007 PERMAFROST INTERVAL WITH DIESEL. LANDED THE TUBING. ND :ZR BOPE. NU ~ TESTED TREE. RELEASED RIG AT 0430 HRS 4-4-90. DAILY:S530,010 CUM:$910,656 ETD:S910,656 EFC: $1,165,000 , Old TD Released rig Classifications (oil, gas, etc,) JNew TD I PB Depth Date IKind of rig Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval loll or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P, C.P. Water % GOR Gravity Allowable Effective date corrected · For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C INumber all daily well history forms consecutively as they are prepared for each well, jPage no. Dlvldofl of AtlimUcRichl~dComp~ny t..; R F.,L AI..ASt< A INC P,O, BOX t()0360 ANCHORAGE., AL. ASKA 995t DATE · 4--4-90 REF"ERENCE' AR(](] CASED HOL. F FINALS 2-.5 3-.30-9() 2-28 3.-24 -90 2.--.28 3-24-9() '7 '-2:7 3 - '2 6- 9 0 7-34 3-24-90 9.-. t t 3-25-90 9-i 4 3"-''~ ~...i .... 90 9-' i 4 3-'2 t "-90 F'RODUCT]:ON L. OGGINb (]BT CE:T F'ERF RECORD F'ERF RE:[.'.O R D F'ERF RECORD & DI:F'TH CONTROL F'ERF RECORD TBG PUNCHER RUN i, 2'&5" RUN I, 5' I:;'.UN i, '.5" RUN t, 5" R LJN i , 5" RUN I, 5' RUN t , 5" RUN t , 5" PI_EASE SIGN AND RE:TURN TFIE ATTACHED COPY AS RECE::[F:'T OF DATA, HAVE: A NICE DAY! .~ At...L.Y HOF."FECKER AT(]-- i 52<?,. RECEIVED DY RECEIVED 90q DISTRIBUTION · ~ CENTRAL FILES .~. CFIEVRON D & M EXTENSION EXPLORATION EXXON MARATHON · ~ MOBIL ... F'HIL. LIPS F'B WEL. L. F'ZL..E:S R & D '-"' BF'X ~ STATE OF ALASKA · .~ TEXACO STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing _ Repair well Change approved program _ Operation Shutdown _ Re-enter suspended well _ _ Plugging _ Time extension _ Stimulat,,e"' _ Pull tubing X Variance _ Perforate ~_. Other X 2. Name of Operator ARCO Alaska, Inc,. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1112' FSL, 125' FWL, Sec. 1, T10N, R15E, UM At top of productive interval 5. Type of Well: Development _ Exploratory _ Stratigraphic _ Service .~X 6. Datum elevation (DF or KB) RKB 54' 7. Unit or Property name Prudhoe Bay Unit 8. Well number 9-14 9. Permit number 1608' FNL, 1533' FWL, Sec. 2, T10N, R15E, UM At effective depth 1329' FNL, 1256' FWL, Sec. 2, T10N, R15E, UM At total depth 1297' FNL, 1225 FWL, Sec. 2, T10N, R15E, UM 12. Present well condition summary Total Depth: measured true vertical 1 1080' feet Plugs (measured) 91 9 9' feet None 77-25 10. APl number 50-029-~0249 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Effective depth: measured true vertical 11007' feet Junk (measured) 91 42' feet None Casing Length Size Structural Conductor 8 0' 2 0" Surface 2682' 1 3-3/8" Production 11 021 ' 9-5/8" Perforation depth: measured See Attached Cemented Measured depth True vertical depth 267sx AS II 102' 102' 6800 sx AS cmt - 2712' 2712' Top job w/ 150 sx AS cmt 1000 sx Class G & 1 1049' 91 75' 300 sx AS cmt true vertical See Attached MAR - C !990 Tubing (size, grade, and measured depth Aiaska 0il,& Gas Cons. 5-1/2", L-80, tbg f/0'-10207' & f/ 10652'-10853' Packers and SSSV (type and measured depth) Camco 'Bal-O' SSSV @ 2199', 'FB-I' pkr @ 10128', 'WD' pkrs ~ 10652' 13. Attachments Description summary of proposal X Detailed operation program _ BOP sketch 14. Estimated date for commencing operation April 1, 1990 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil w Gas _ Suspended Service WAG Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~,0~ ~ Title Drilling Analyst FOR COMMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity m BOP Test Mechanical Integrity Test Approved by the order of the Commission Form 10-403 Rev 06/15/88 Location clearance Subsequent form require 10- ~¢~ u~IGINAL SIGNED : 8¥ LONNIE C. SMITH Commissioner IApproval No. · / Date '='3~" 7' ¢ 4) SUBMIT IN TRIPLICATE Item 12. Application for Sundry Approvals DS 9-14 continued Perforation depth: 10390'-10420' 10436'-10466' 10523'-10543' 10560'-10600' 10602'-10622' 10633'-10645' 10667'-10707' 10740'-10754' 10808'-10812' 10816'-10828' 10850'-10869' 10880'-10915' TVD 8661'-8683' 8697'-8619' 8763'-8779' 8792'-8823' 8825'-8841' 8849'-8859' 8875'-8922' 8932'-8943' 8985'-8988' 8991'-9000' 9017'-9032' 9041'-9068' RECEIVED MAR - 6 !990 AJaska 0ii & 0,% Cons. Corr~missioF Anchorage DS 9- 14i WORKOVER PREUMINARY PROCEDURE OBJECTIVES: · Pull the 5-1/2" completion. · Mill and Retrieve the 9-5/8" 'FB-I' permanent pecker at 10,128'. · Mill and Retrieve the 9-5/8" 'VVD' permanent packer at 10,480'. · Fish the tailpipe assembly off of the 'WD' packer at 10,652'. · Perforate 10,602'-10,622' and 10,633'-10,645'. · Run 2-1/16" washpipe through the straddle completions. · Run a straddle assembly and packer across zone 3. · Run a new 9-5/8" permanent packer and 7" completion. PRIOR TO RIG-UP: Coordinate with the wireline group and perform the following slickline work: Pull the Camco SSSV at 2195'. Perforate 10 circulating holes in the 5-1/2" tubing at_+10,090' (within +5' of the top of the second joint above the packer). PROCEDURE: 1. MIRU Nabors 2ES. Kill and displace the well with 8.5 ppg seawater. 2. ND Tree. NU and test BOPE. 3. Puli and LD the 5-1/2" completion. 4. PU DP. RIH, mill and retrieve the Baker 'FB-I' permanent packer at 10,128' MD. 5. Mill and retrieve the Otis 'WD' permanent packer at 10,480' MD. 6. Fish the tailpipe assembly off of the Otis 'WD' permanent packer at 10,652'. 7. RIH w/a 9-5/8" RTTS and a set of 6" dummy seals. Set the RTTS at _+10,350' and pressure test the 9-5/8" casing to 3500 psi. TIH and test the 'WD' packer at 10,652'. POH. 8. RU E-line and perforate zone 3 at 10,602'-10,622' and 10,6.33'-10,645'. RD E-line. 9. PU 300' of 2-1/16" CS Hydril tubing and run through the straddle completions to _+ 10,950'. 10. Set a 9-5/8" permanent packer and straddle assembly across zone 3. 11. Set a 9-5/8" permanent packer and tailpipe assembly at_+ 10,120'. POH and LD DP. 12. Run a 7" completion string. Freeze protect and land the tubing. 13. ND BOPE. NU and test the Tree. RECEIVED BHP = 3700 psi at 8800' TVD (8.1 ppg equivalent) Anchorage 13-5/8" 5000 PSI BOP STACK ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1. 13-3/8" CASING HEAD 2. 5000 PSI TUBING HEAD 3. 13-5/8" - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLING SPOOL 5.13-5/8" - 5000 PSi BLIND RAMS 6. 13-5/8" - 5000 PSI PIPE RAMS 7. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR OAPA01TY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IA[3(3 REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. RECEIVED Anchorage DAM 11/20/89 BOP SCH (FOR: NAB 2ES) ARCO ALA,?KA., ZNC, F', 0 · BOX i ANCI4ORAGE., ALA~I<A DATE · ._ 6-9-89 REFERENCE' ARCO CASE O HOLE FINALS 3-9 ~5-22-89 PRODUCTION F'F~:OF i LE RUN ~;3-24 ~-°'n-8o GR ~'F'EC TOOL RUN ~-,.,~'-"~¢-',-., 5-26-8o, GR SPEC TOOL RLIN "" 4-i 5 5-i 7, i 9-89 'I'EMF' RUN ~ 4-26 5-i 9--89 F'RODUC'TION PROFILE RUN ~ 4-T5~ 5-i 8-89 PRODUCTION PROFILE RUN -"'- 5-t $ 5..-'2¢, ":2i -89 rEMP RUN --..-. 5-i 7 5-2¢,-89 F'RODUC'f'ION F'ROFILE RUN ~-7-7A 5-28-89 F'ERF F.:ECORD RUN -'"" 9-~4 5-22-89 INJECTION F'ROF.[LE RUN -'--""t 2-t t 5-2i --89 F' ]:T~S' RUN '""~i '~- ~ 9 ~ ''~ ' - 89 ,_ .., -..,. 1 INJECTION F'ROF' 1_' LE RUN '"~--t 4-t ;3 ~-27-89 COLLAR/F:'ERF RUN --- ~ 8-2 ~ 5-22-89 CBT RUN OWDW NW .,- ,.4 25-89 F']:'I'$ RUN ---- OWDW-,S'E 5-25-89 F':[T$ RUN "~ OWDW-,.gW Z-24-89 PITS RUN F'LEA~E SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. C A ti C 0 ,S'C 14 ,S' C: H L; A ¢i C 0 C A ~-i C 0 C A ~i C 0 [; A r'~ C 0 C A fl C 0 C A t~ C 0 CAFiCO CA~'flCO CAMCO CAMCO ~ CENTRAL FILES ~ ~ F'HILLIF'5' " CHEVR.fJN~,:::i F':~ :::.i PB WELL FILES' D &. M' '" ,. R ,::~ D '~, E X lr: E N $ t 0 i~-; EXPLORATION .,.~ f_~ F' X ~ EXXON ~ ~""FA'[IE OF ALA3'KA MARATHOn.,. ~ .... -,-'"' TEXACO ~ MOBIL ARCO ALASKA, INC,, P,,O,, BOX t (:.5036~} ANCHORAGE, ALAS'K A 995 i ,'3 DATE' 4-24-89 REFERENCE' ARCO CASED HOLE FINAL~ t-iA 4-6-89 F'RODUCT]]ON F'ROFILE RUN 2- i 6 3-23-89 TEMF' RUN 9-t4 3-23-89 CCL/X-Y CALIPER RUN 9-i 6 4-14-89 COLLAR/PERF RUN 9-38 4-t3-89 CBT RUN 9-38 4-t $-89 CET RUN it-6 .'3-t 5-89 PRODUCTION F'ROFILE RUN i i -i 7 4-~ 5-89 COLLAR/PERF RUN i t -i 8 4-t 6-89 COLLAR/F'ERF RUN i 2-4 $-'2(~-8'? PRODUCTION F'ROFILE RUN i2-i2 S-t9-89 PRODUCTION f:'ROFILE RUN i2-i.3 S-i6-89 PRODUCTION F'ROFILE RUN i2-t7 3-i8-89 F'RODUCT]:ON PROFILE RUN t2-28 S-t7-89 PRODUC'i"ION PROFILE RUN t 8-t 6 3-26-89 TEMF' RUN t 8-23 3-29-89 CCL RUN F'LEA~*E SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF' DATA, RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-1529 .... El ED Anchorage TRAN$~ 89~t CAMCO CAMCO CAMCO A'I"I_AS~ 3CI..t ~'CH C A hi C 0 A i'I_A~ ATLAS' CAMCO CAMCCI CAMCO CAMCO CAMCO CAMCO CAMCO DISTRIBUTION .,,.-" CENTRAL FILES ~ PHILLIP~ · ,,-'" CHEVRON PB WELL F'ILE3' D & M R & D ~' EXTENSION EXPLORATION ~ BF'X '- EXXON ~ STATE OF ALA~'KA MARATHON ~ TEXACO ~~ MOBIL , STATE OF ALASKA :' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] Water Injector ........ 2. Name o'f OpErator .................. 7. 't~ermit '~umber ARCO Alaska, Inc. 77-25 "3'i Addres~ .............. 8. APl Number ?,0. Bo× 100360, Anchorage, Alaska 99510 50- 02~9.20249 .. 41 Location of well at surface 9. Unit or Lease Name lll2'FSL, 125'FWL, Sec. 1, TION, R15E, UM Prudhoe Bay.Unit At Top Producing Interval 10. Well Number 1608'FNL, 1533'FWL, Sec. 2, TION, R15E~ PM 9-14 . At Total Depth 11, Field and Pool 1297'FNL, 1225'FWL,. Sec. 2, .... T10N, .......... R15E, UM . Prudhoe Bay Field 5. Elevation in feet {indicate I~B~ DF~ et~.i } 6. Lease Designation and Serial No. ?Tudhoe Bay 0il 7ool 54' RKB . I ADL 28327 1-2. Date Spudded 13. DateT.O. Reached 14. Date Comp., Susp. orAba~d.' 115: Water ~ept'hl if offshore 116. No. of Comp~etions 07/16/77 08/04/77 08/22/77* ...... N/A f. eet_MSL. . ]. . '"17. Total Depth (MD+TvD, 18. Plug Back Depth (MD+TVD, 19. DirectionalSurvey 1 20. Depth where SSSV set [ 21. "IJhickness of Permafrost ll080'MD, 9199'TVD llO07'MD, 9142'TVD YES~ NO[] 2199 feet MD 19OO' (aoorox.] 22. Type Electric or Other Logs Run ..... ' DIL/BHC/.G.R, .FDC/CNL/GR, CNL/GR/CCL, CCL,. F~.L ............... ........ 23. CASING, LINER AND CEMENTING RECORD sETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED __ 20"' 96.0# H-40 Surf. 102' [' 30" ?R7 _. 1.3-3/8" 72.0~ MN-80 . , Surf. 2712' 17~,,_ 6800 .~x AR Cm~ ............ 9-5/8" 47.0~ N-80/ Surf. 11049' 12~" ]OOO ........ Rs-95 ............. 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. 'SFUBIN'G RECORD · ......... interval, size and number) SIZE ''' DEPTH SET (MD) pACKEI~'SELF (MD) See attached ~ 26. A~:] O, FRAcTbRE, C~MENT SQ~IEEZEi ETCl DEPTH INTERVAL (MD) ~,'MOUNLF & KIND OF MATERIAL USED ..... 27. PRODUCTION TEST Date First Production 1 Method of Operation (Flowing, gas lift, etc.) 2/0~/78 ~ Future In iector Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER~BBL cROKESIZE' [GAS-oILRATiO N/A ............ TEST .PER!0o..~l ........... ~l~lo~v Tubing Casing Pressure CALCULATED oIL-BBL GAs-MC~ WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. ' ..... ~ORE DATA ........ Brief description o~ lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RE([EIVED ~/A AUG - 9 1988 *NOTE: Perforated well 11/22/77. Well worked over 9/28/86. Reperforated 6/27/87'jilBslc~lDJJ&~ia~C0Q$.C0mm~l~ I Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. · .. i , GEOLOGIC MARKERS FORMATION TESTS ' I NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 10382' 8655 ' N/A Base Sadlerochit 10951' 9097 ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed. ~,------~,~¢ ~,,~ ~::-f' Title Opr. Engr. Mgr. Date ~//~6 ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used a.s reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item,2.1' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). .~' ~ - 'i .,.~ '::'.~. Item ~"3:'""A:t~ached supplemental records for this well should show the details of any multiple stage cement- jng and. the location of the cementing tool. ., . .I.tem ,~ Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, .~s'lnjection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none" Form 10-407 WELL COMPLETION OR RECOMPLETION REPORT AND LOG DRILL SITE 9-14 Item 24' Measured Depth 10390-10420 10436-10466 10523-10543 10560-10600 10602-10622 10633-10645 10667-10707 10740-10754 10808-10812 10816-10828 10850-10869 10880-10915 True Vertical Depth 8600-8623 8636-8659 8702-8718 8731-8762 8763-8778 8786-8796 8813-8859 8869-8880 8921-8925 8928-8937 8954-8968 8977-9004 Perforated w/4 spf * Perforated w/1/8 spf Item 25- Tubing, packer & SSSV depths' 5½", 17#/ft, L-80, LTC tbg f/O' - 10146' w/SSSV @ 2195' 5½", 17#/ft, L-80, LTC tbg f/10128'-10207' w/FB-1 pkr @ 10128' Pkr assembly f/10480'-10505', w/WD pkr @ 10480' 5~" 17#/ft L-80 LTC tbg f/10652' 10853' w/WD pkrs @ 10652' & 10771' RECEIVED AUG - 9 1988 Alaska 011 & ~Ja$ Co~s. Commissi~rl STATE OF ALASKA ALASK~ ,,~IL AND GAS CONSERVATION COMM .... ,.,ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate ~[ Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska= Thc. 3. Address Post 4. Location 1112' At top of Office Box 100360, Anchora.qe, AK 99510 of well at surface N & 125'E of SW cr, Sec. 1, TION, R15E, UN productive interval 1112'N & 125'E of SW cr, Sec. 1, TION, R15E, UM At effective depth 1608'S & 1533'E of NW cr, Sec. 2, TION, R15E, UM At total depth 1297'S & 1225'E of NW .cr, Sec. 2, TION: R15E: UM Present well condition summary Total depth: measured 11080 feet Plugs (measured) true vertical 9131 feet Effective depth: measured 10934 feet Junk (measured) true vertical 9018 feet 5. Datum elevation (DF or KB) 54' RKB Feet 6. Unit or Property name PrtJdhnP Rav Ilnit 7. Well number DS 9-14 8. Approval number 7-316 9. APl number 50-- 029-20249 10. Pool Prudhoe Bay 0il Pool Casing Length Size Cemented Measured depth Rue Vertical depth Conductor 102' 20" 267 sx Arctic Set 102' 102' Surface 2712' 13-3/8" 2875 sx Arctic Set 2712' 2712' Production 11049' 9-5/8" 800 sx Class G 11049' 9107' 10390-10420' 10436-10466' 10523-10543' 10560-10600' Perforation depth: measured 10602-10622' 10633-10645' 10667-10707' 10740-10754' 10808-10812' 10816-10828' 10850-10869' 10880-10915' true vertical 8600-8623' 8636-8659' 8702-8718' 8731-8762' 8763-8778' 8786-8796' 8813-8859' 8869-8880' 8921-8925' 8928-8937' 82. , Tubing (size, grade and measured de 4-8968' 8977-9004 See attached Packers and SSSV (type and measured depth) See attached 12. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 40,000 40,000 Tubing Pressure 1800 1720 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Form 10-404 Rev. 12-1-85 Title Operations Engineerinq Manager 9-14/Stat17 M. R. Miller (263-4276) Date ~-//',~ ~ Submit in Duplicate Attachment to Report of Sundry Well Operations DS 9-14 Tubing, Packer & SSSV Depths: 5½", 17#/ft, L-80, LTC tbg f/O' - 10207' w/SSSV @ 2195' & FB-1 pkr at 10128' Pkr assembly f/10480'-10505', w/WD pkr @ 10480' 5½", 17#/ft, L-80, LTC tbg f/10652'-10853', w/WD pkrs @ 10652' & 10771' Summary of Operations Began perforation operation on 6/27/87. SI well, RU perforating unit, pressure tested equipment. RIH with gun #1, put lift gas down well, flow well to tank, perforated interval 10633-10645'MD (1/8 spf). SI well, POOH, all shots fired. RIH with gun #2, put lift gas down well, flow well to tank, perforated interval 10602-10622'MD (1/8 spf). SI well, POOH, all shots fired. Secured well, RD, returned well to injection. ARCO ALASKA, INC, P~O, BOX t(~0;368 ANCHORAGE, ALASKA 999~ ~) DATE- t-t2-88 -REFERENCE: ARCO CAGED HOLE FINAl._ i -22 t 2-i ,%_-87 F'UMF'-IN TEMPERATIJRE ,.~I_IRVEY RI.IN ----- .5-14 t2-t6-87 LEAK DETECTION RUN ~6-8 i2-~i-87 F'RODI..ICTION PROFILE RLIN ~ .6.-t3 t2-t2-87 F'RODi..ICTT. ON PROFILE RI.IN ~-6-t8 t2-tt-87 PRODUCTION F'RFIF.1TLE RI. IN ----9-2 t 2.-t 9-87 PRODI..ICTION F'R(IFi[I_E RI.IN -"~'9-S i ...-..4-87 F'RODL.ICT.ION PROFILE RUN ~.9-..3. t (-)-SG-87 PFC LOG RUN ~ .9-,.S t (-.]-~0-87 VERT.1]I. OI.~ F(I..IN ~ 9-_5 I-.5-88 PRODUCTION I...O~ RUN '~...~.i~]::4 t2-t.9-87 ,.~TEF' RATE IN,..IECT.T. ON PROFILE RUN '---- 1 t -t 7 I 2-t 7/t 8 F']:'I-.S' RUN ~tt-27 t2-t4-87 FL. OWMETER RUN · l .S-2 t :2-2,3/24 F'RODLIC'I'T. ON F'ROFI. I..E RUN ~t~-t4 i~-0-i0-87 F'RISM RUN ~.t3-29 1'2-2~-87 PRODUCT.T. ON PROFILE RIJN -~-tS-S~ t2-tS-87 F'RODUCTION PROFILE F(IJN ~.1 4-6 I ':2-2(:')-87 F'RODLICTION F'ROFII_E RUN ~ t4-tt t2-28-87 FLOWMETER ,~IJRVF_Y RLtN ~ t5-9 i 2-27-87 F'RODI..IC'F]?ON F'RF!F~ =' · RUN ~t5-22 tt-2-87 VERTILOC, RUN ~, t6-7 t2-26-87 F'RODLICTION FR .... F.It...E-". RIJN --, t7-t2 tG-t t-87 D.T. FF?TENF'F. RATIJRE/E,R RUN t7-t'2 t(-}-tt-87 PRI~M RI.IN RF..TI..IRN T,,.H~Fe~_~TT~,~"~I) COPY A.~ RECE.T.F'T 01-- DA'FA. ..... HAVE A NICE DAY! ~~[13~~ii~I~ 011 & Gas Cons. Commissio~l PE(.;L;Y BENNETT ~' ' ~[IlChora~e. ATO-t 527 TRAN$ ~88 .~26 ~ AF'F'ROVED_ . DI3TRIBUTION 5' 5' 5' 5' 5' 5' 5' 5" 5' 5' 5" 5' 5' 5' 5' 5' 5" 5' 5 ' 5' 5' 5' CAM~O CAMCO CAMCO CAMCF. I CAMCO (]ANCO CAMCO WAI ,.?CH CAMI?.O CAMCO CAMCO CAMCO ATL. A~ CAMCO CAMCO CAMCO CAMCO CAMCO WA I CAMCO WA I A TI._A,'~ CENTRAL I-- I I._E2 ~ F'H I I...!.. I F',.9 CHEVRON F'B WELL FTL. I.--,S' I) & M R .h. D EX'TEMPI ON EXF'LORATION ~ ,~7 AF' C EXXON ~ ,~TATE OF AI._A,?KA MARATHI..]N $ TEXACO MOBIl... ARCO Alas'ka, Inc· I',~0. Box i00S60 Anchorage, A L as'l,, a 995t0 DAI'E' JuLy 8, i987 REFERENCE' ARCO Cam'ed HoLe Final S.-i8 6-28-87 Perf, Reco¥'d 5-t O 5-29-87 Ver'$ i Log 6-.24 '7--3- 8-t F:'er f, Record 9-t4 6-27--87 Perf. Recor'd 4--i7 6-29-87 Perf, Reco¥'d 4--~52 6--29--87 Pe¥'f, Record 6--'ii 6-'27-.87 Pe¥'f, Reco~-d Run i , Run i, Ru~ i, Run i, Run t , Run t , Run t, 5 ' 5" 5' 5" 5' 5' .5 ' $ch D ¥' ¢.., .~..~ S' Sch Sc h $c h Sc h $ch Ro~anne Peek ATO-I 529 I'RAN$ $87348 ~. App roved "".,,- Cen'tra L Fi Le~r Chevron -r I) & H ~.,. Ex~'en_cion ExpLoration · ..'"' E x x o 1'/ Mara fhon ~: Mob i I. Phi llips F'B WeLL F'i L e.~ R & D $oh i o State of Alaska Texaco ARC,,O Alaska, Inc. Prudhoe Bay ..ngineering Post Office Box '~00360 Anchorage, Alaska 99510=0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 6, 1987 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commi ssi on 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 Permit Number: 77-25 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/FEB: sd Enclosure cc: Standard Alaska Production Co. File P1(DS9-14)W1-3 RECEIVED Alaska Oil & Gas Cons, Commission Anchorage ARCO Alaska, inc. is a Subsidiary of AtianticRichfieldCornpany STATE OF ALASKA ALAS, . <.)IL AND GAS CONSERVATION COM, .~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska. Inc. 3. Address Post Office Box 100360, Anchorage, AK 99510 4. Location of well at surface 1112'N & 125'E of SW cr Sec. 1, TION, R15E, UM At top of productive interval 1112'N & 125'E of SW cr Sec. 1, TION, R15E, UM At effective depth 1608'S & 1533'E of NW cr Sec. 2, TION, R15E, UM At total depth 1297'S & 1225'E of NW cr Sec. 2, TION, R15E, UM 5. Datum elevation (DF or KB) 54' RKB feet 6. Unit or Property name Prudhoe Ba.v Unit 7. Well number DS 9-14 (11-2-10-15 8. Permit number 77-25 9. APl numS~) 50-- -20249 10. Pool Prudhoe Bay 0il Pool 11. Present well condition summary Total depth: measured true vertical 11080 feet Plugs (measured) 9131 feet Effective depth: measured 10934 feet Junk (measured) true vertical 9018 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 102' 20" 267 sx Arctic Set 102' 102' Surface 2712' 13-3/8" 2875 sx Arctic Set 2712' 2712' Production 11049' 9-5/8" 800 sx Class G 11049' 9107' Perforation depth: measured 10390'-10420', 10436'-10466' 10523'-10543' 10560'-10600' 10667'-10707', 10740'-10754', 10808'-10812', 10816"-10828', 10850~-10869', 10880',-1091 true vertical 8600' -8623', 8636' 78659' 8702' -8718', 8731' -8762' 8813'-8859', 8869'-8880', 8921'-8925', 8928 -8937", 8954'-8968', 8977'-9004', Tubing (size, grade and measured depth) See Attached Packers and SSSV (type and measured depth) See Attached 12.Attachments Description summary of proposal [] Detailed operations program~]~ ~O~ ~I~c~ Tubing, Packer & SSSV Detail x 13. Estimated date for commencing operation May 15, 1987 14. If proPosal was verbally approved Alaska 0il & Gas Cons. C0m~TiJssion Name of approver ¥o,'"n ~,-~ /6~O~;;~; ~ ~ ~//~ Date approved 15. I hereb~ertify that the foregoing is true and correct to the best of my knowledge Manager Date Commission Use Only Conditions of approval Approved by Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Commissioner ] Approval No. 7-3/g by order of the commission Date Submit in triplicate Form 10-403 Rev 12-1-85 FEB (263-4261) Attachment to Application for Sundry Approvals DS 9-14 Tubing, Packer & SSSV Depths: 5½", 17#/ft, L-80, LTC tbg f/O' - 10207' w/SSSV @ 2199' & FB-1 pkr @ 10128' Pkr assembly f/10480' - 10505', w/WD pkr @ 10480' 5½", 17#/ft, L-80, LTC tbg f/10652' - 10853', w/WD pkrs @ 10652' & 10771' ARCO Alaska, Inc. proposed to add perforations to DS 9-14 at selected intervals within the Sadlerochit Sand of Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating operation. Proposed Perforation Intervals' 10602' - 10622'MD (20') 10633' - 10645 'MD (12') REF' BHCS 9/4/77 RECFIV'ED F;.'. e,::: e i ve ct i..inVIi!] A NiCE DA'K! J:;.'. C) :ii: ,'..'.t l'i i'i E'? J::' F:) E:.' J< A ',"' (:.i .... i '::'"' "' ,..:..:..'. ;:: re,::: e i r-:' t' o f d ,'..', 't' a. ARCO Al. as;' I::' ,. 0 ~ Box Anchorage, AI.a.'.-?ka C ,.::ifii C 0 f..;'a ,'~ (:: o I::' 1. e a ..-":. e ~ i g 'n a n d r e 't' u r 'n t' h e a -i: 't' a (:: h e d (: o I:) '>' a :ii: r e c e i r.:' !' c::, t" d a 'l' a., Received By ................................................................. D I :'? T I:;.'. ]; B U '¥' !; 0 N :',I: F:'hi I. I. il::' '-i: PI'.Z,' WeLl. F:'i Le2: F;..' & I) :I~: .'? c, h i c, ~ ,?l'at'e of A Laz...-I<a ,.I',:'f'e x a c o '-: ......... ' STATE OF ALASKA ---- ~ ALASKA'u,- AND GAS CONSERVATION Cu~,.,~MISSION W"=LL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well ~..,~ OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE F~x Water. Injector · 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 77-25 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510-0360 50- 029-20249 4. Location of well at surface 9. Unit or Lease Name 1112' FSL, 125' FWL, Sec. 1, T10N, R15E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Nurnber 1608' FNL, 1533' FWL, Sec. 2, T10N, R15E, UM 9-14 At Total Depth 11. Field and Pool 1297' FNL, 1225' FWL, Sec. 2, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oi 1 Pool 54' RKBI ADL 28327 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 7/16/77 8/04/77 8/22/77* N/A feet MSL 1 17. Total DePth (MD+TVD) 18.Plug Back Depth (MD+-FVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 11080'MD,9199'TVD 11007 'MD ,9142 'TVD YESx~ NO [] 2199 feet MDI 1900' (approx~ 22. Type Electric or Other Logs Run DIL/BHC/GR, FDC/CNL/GRs CNL/GR/CCL, CCL, FDL 23. CASING, LINER AND CEMENTING RECORD , SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" '96.0# H-40 Surf luz' .sO" 267 sx AS II -i3-,~/8~ /Z.U¢~ MN-~o Surf 2712' 17-1/2" 6800 sx AS' cmt "Top job performed w/150 sx AS cmt 9-~/~~ ~/.o~ N-SU/RS-~ Surf 11049' 12-1/4" 1000 sx Class G & 300 s~ AS cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) "~ See Attached ~ A~h~d 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL(MD) AMOUNT& KINDOF MATERIAL USED I~RRR~-I~ql~~ 1~ n~ ~1 NPI ..... 27. PRODUCTION TEST . . , Date First Production Method of Operation (Flowing, gas lift, etc.) 2/04/78 Future Injector , Date of Test Hours ~ested PRODUCTION FOR ~OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO N/A TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithotogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/A NOV 0 ~s Co~ c0mmmsi0n , , Form 10-407 Rev. 7-1-80 NOTE: Pe~-forated weii i1/22/11. Well worked over 9/28/ CONTINUED ON REVERSE SIDE (DAM) Submit in duplicate NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochit 10,382' 8655' N/A Base Sad]erochit 10,951 ' 9097' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed__ (~~~ TitleAss°ci ate Engi neet Date /0 %-~'-~6 // INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 Item 24: WELL COMPLETION OR RE£OMPLETION REPORT AND LOG DRILL SITE 9-14 MEASURED DEPTH 10390 - 10420 10446 - 10466 10523 - 10543 10560 - 10600 10667 - 10707 10740 - 10754 10808 - 10812 10816 - 10828 10850 - 10869 10880 - 10915 TRUE VERTICAL DEPTH 8660 - 8683 8696 - 8719 8763 - 8779 8792 - 8823 8875 - 8922 8932 - 8943 8985 - 8988 8991 - 9000 9017 - 9032 9041 - 9068 Item 25: Tubing, packer & SSSV depths: 5-1/2", 17#/ft, L-80, LTC tbg f/O' - 10146' w/SSSV ~ 2199' 5-1/2", 17#/ft, L-80, LTC tbg f/10128' - 10207', w/FB-1 pkr ~ 10128'. Pkr assembly f/10480' - 10505', w/WD pkr ~ 10480' 5-1/2", 17#/ft, L-80, LTC tbg f/10652' - 10853', w/WD pkrs ~10652' & 10771' WC1/148a:dmr 10-31-86 NOV o 51986 Alaska Oil & 6as Cons. Anchorage CommiSsion ARCO AI.a.s'ka F',. 0. Box A n c !'; o r a ca e, A I. a s' k a 99.5 ~ O DATE' october R E F E R E N C E ' A R C 0 --' '~ 9-~ 4 ~ -0-6-86 - .-~ 9--~ 7 ~ 0-S-86 Run ~ Rt!l~ 'J ,-,':~'" Dr e.s' s' F:' Lea~e Rec'e i red HAVE A N ATO-~ 5o9 I C E I)~-~ Y .)/~a Oil & Gas Co~3. Commission k..//'-- ~choraQe Peek TRAN~ ~8669~ of data, I) I S T R I B U T I 0 N Central F'i l.e.s' C i ,.. e v r o n D & M Ex!'en_~ion Eixplor~tion Ex xon Marathon Mob i / · ,,.'~ P hi L Lip .~,'. F:'B WeLl. F'i Le~ R & T) 4. ~e:h J o '11' ("' I ate of A La.'-~ka Texaco ..... STATE OF ALASKA ALA[ . OIL AND GAS CONSERVATION CON, $SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate~i~..~ Plugging,~ Perforate ~ Pull tubing Alter Casing [] Other 2. Name of Operator ARCO Alaska, Inc. 3. Address . P 0 Oc× I ..... nc..crc.§c, 4. Location of well at surface 1112' FSL, 125' FWL~ Sec.1, TION, R15E, UN At top of productive interval 1608' FNL, 1533' FWL, Sec.2~ T10N~ R15E, UH At effective depth 1330' FNL, 1257' FWL, Sec.2, TION, R15E, UN At total depth 1297' FNL, 1225' FWL, Sec.2, T10N, R15E, UN 5. Datum elevation (DF or KB) RKB 26 ' 6. Unit or Property name Prudhee B~,, Unit 7. Well number 9-14 8. Approval number 3/+7 9. APl number 50-- 029-20249 10. Pool Prudhoe Bay 0il Pool Feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length feet 11 080 ' MD feet 9199 ' TVD I 1 007 'MD 91 40 ' TVD Size Conductor 80' 20" Surface 2682' 13-3/8" Production 11021' 9-5/8" feet feet Plugs (measured) N o ne Junk (measured) Sinker bar (~ 11007' Fill @ 10998' Cemented Measured(~:ef~ Trt~ kV~r)tical depth 267 AS' I I 102'MD 102'TVD 6800 sx AS 2712'MD 2712'TVD Top job w/150 sx AS 1000 sx Class G 11049'MD 9173'TVD Perforation depth: measured true vertical (See Attached) (See Attached) Tubing (size, grade and measured depth) (See Attached) Packers and SSSV (type and measured depth) (See Attached) RECEIVEO 12. Stimulation or cement squeeze summary OCT 2 9 1986 Intervals treated (measured) 10,850' - 10,915' Treatment description including volumes used and final pressure Alaska 0ii & Gas Cons. Commission Anchorage 13. 10:000 Gal N/A 750 Gal NH, CL w/TLC-80 & 100 bbls H.O Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 14. Attachments (Workover Well HistorrY Daily Report of Well Operations Copies of Logs and Surveys Run ~/J 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed (~,~.~ ¢/~i,/Li.A~ Title Form 10-404 Rev. 12-1-85 (¢ - Associate Engineer Date /O'~ 7-~¢0. Submit in Duplicate REPORT OF SUNDRY WELL OPERATIONS DRILL SITE 9-14 Perforation Depths: MEASURED DEPTH TRUE VERTICAL DEPTH 10390 - 10420 10436 - 10466 10523 - 10543 10560 - 10600 10667 - 10727 10740 - 10754 10808 - 10812 10816 - 10828 10850 - 10869 10880 - 10915 8660 - 8683 8696 - 8719 8763 - 8779 8792 - 8823 8875 - 8922 8932 - 8943 8985 - 8988 8991 - 9000 9017 - 9032 9041 - 9068 Tubing, packer & SSSV depths: 5-1/2", 17#/ft, L-80, LTC tbg f/O' - 10146' w/SSSV ~ 2199' 5-1/2", 17#/ft, L~80, LTC tbg f/10128' - 10207', w/FB-1 pkr ~ 10128'. Pkr assembly f/10480' - 10505', w/WD pkr ~ 10480' 5-1/2", 17#/ft, L-80, LTC tbg f/10652' - 10853', w/WD pkrs @10652' & 10771' SWO/lO7a:dmr 10-07-86 · ~ Oil & G~s ~o~s. commissio~ ARCO Oil and Gas Company Well History - Initial Report- Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. IState Alaska District Lease parish or borough Alaska .County. North Slope Borough Field or Unit Prudhoe Bay ADL #28327 Auth. or W.O. no. [T tie AFE AS0961 (Cap) ] Recompletion WWS #1 AP1 50-029-20249 Operator ARCO Alaska, Inc. Workover 9/10/86 2000 Hrs. Date and depth Complete record for each day reported as of 8:00 a.m. ]ARCO W.,. 21 · 66% Prior status if a W.O. 9/11/86 9/12/86 9/13/86 thru 9/15/86 9/16/86 9/17/86 9118/86 9-5/8" @ 11,049' 11,007' PBTD, Fill @ 10,940', NU BOPE 8.6 ppg seawater in tbg/10.6 CaCloin csg Accept rig @ 2000 hfs, 9/10/86. ND tree, NU BOPE. 9-5/8" @ 11,049' 11,007' PBTD, POH, LD 5½" tbg 8.5 ppg seawater NU & tst BOPE. Pull tbg hgt. PU OS & latch 5½" tbg; unable to tel f/pkr. Pull SS$¥. Pmp 230 bbls brine dn tbg; well on vacuum. Cut tbg, LD OS, POE, LD tbg. Accum fluid loss = 972 bbls. 9-5/8" @ 11,049' 11,007' PBTD, Repair rotary clutch 8.5 ppg seawater Pull & LD 5½" tbg. RIH w/OS, tag TOF @ 10,030', latch & Jar free. kill pill, POH w/fsh, LD SBR & K-Anchor. TIH w/mill, tag & mill on pkr, repair rotary clutch. Pmp 9-5/8" @ 11,049' 11,007' PBTD, PU BHA 8.5 ppg seawater Fin repairing rotary clutch. Mill pkr, CBU, POH, LD fsh. (Accum fluid loss = 7348 bbls). PU new BHA. 9-5/8" @ 11,049' 11,007' PBTD, Fill @ 10,998', PU 9-5/8" RTTS 8.5 ppg seawater RIH, tag top of fill @ 10,820', wsh & rm to 10,998', pmp pill, CBU, POH. PU RTTS. 9-5/8" @ 11,049' 11,007' PBTD, POH w/RTTS 8.5 ppg seawater RIH w/RTTS to 2526', tst csg to 3000 psi, POH. RIH w/RTTS to 10,307' re-tst csg to 3000 psi. RIH w/RTTS to 10,899', acidize perfs 10,850'-10,915', rel RTTS & POOH. The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Date Title 10/22/86 J Drilling Supervisor ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ICounty or Parish I State Alaska North Slope Borough Alaska Field ILease or Unit Well no. Prudhoe Bay I ADL #28327 9-14 W/O Date and depti~ Complete record for each day while drilling or workover in progress as of 8:00 a.m. 9/19/86 9/20/86 thru 9/22/86 9/23/86 9/24/86 9/25/86 9/26/86 9-5/8" @ 11,049' 11,007' PBTD, POH 8.5 ppg seawater POH. RIH w/BP, set @ 10,015', tst to 1000 psi. Set subsurface contrl vlv & RTTS pkr @ 80'. ND BOPE, chg tbg head & 9-5/8" pack-off to 5000 psi. NU & tst BOPE. Retry SSCV, POOH. RIH, retry BP @ 10,015', POOH. (Accum fluid loss = 12,314') 9-5/8" @ 11,049' 11,007' PBTD, POH, LD DP 8.5 ppg seawater POH w/BP. RIH w/RTTS & RA mkr, set RTTS @ 10,840', tst injectivity below RTTS w/mo rtns. Reset RTTS @ 10,835', tst inJectivity. Set & tst RTTS @ 10,940'; OK. POH to 2570', tst FO & pack-off to 3000 psi/30 min; OK. RU DA, rn gage ring/JB to 10,910'. Set WD pkr @ 10,942', RD DA. RIH w/pkr on DP, set "B" Pkr @ 10,771' WLM, POH. RIH, set "C" pkr @ 10,652' WLM. TOH, LD DP. 9-5/8" @ 11,049' 11,007' PBTD, RU DA 8.5 ppg seawater Fin LD DP. RU DA, att to rn pkr assy on WL; unable to get below 5762' POH. Make GR/JB rn. MU pkr on DP & RIH. RU DA. 9-5/8" @ 11,049' 11,007' PBTD, Drop ball 8.5 ppg seawater Tie in pkr, drop ball, set pkr, POH. Drop ball. 9-5/8" @ 11,049' PU FB-1 pkr, RIH OCX 2 9 19B6 8.5 ppg seawater Set pkr @ 10,128', POH, LD DP Instl 5½" rams & ts . ~ sea~4~y, RIH on 5½" tbg. PU SSSV, tst contrl ins. RIH w/5½" tbg. 9-5/8" @ 11,049' 11,007' PBTD, POH, LD 5½" tbg 8.5 ppg seawater Rn 245 its, 5½", 17#, L-80 LTC AB Mod tbg. Pmp 100 bbls diesel to freeze protect well. Lnd tbg hgr, att to tst ann w/o success. Pull tbg hgr. Att to locate seal assy into pkr. RU DA, rn CCL strip f/10,280'-9990'; seals not in pkr. Att to locate into pkr. Circ out diesel, POH, LD tbg. The above is correct Date Title 10/22/86 Drilling Supervisor For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 8§ and 87 ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned. or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District County or Parish Alaska North Slope Borough Field Lease or Unit Prudhoe Bay ADL #28327 Auth, or W.O. no. I T t e AFE A80961 (Cap) I Recompletion WWS #1 API 50-029-20249 Operator A.R.Co. W.I. ARCO Alaska, Inc. 21.66% IAccounting cost center code State Alaska JWell no. 9-14 W/O Spudded or W.O. begun Workover Date 9/10/86 I otal number of wells (active or inactive) on this Dst center prior to plugging and bandonment of this well our I Prior status if a W.O, I 2000 Hrs. Date and depth as of 8:00 a.m. 9/27~86 thru 9/28/86 10/7/86 10/8/86 lO/lO/86 lO/11/86 .lO/12/86 lO/13/86 Complete record for each day reported 9-5/8" @ 11,049' 11,007' PBTD, Fill @ 10,998', RR 8.5 ppg seawater w/diesel cap POOH & LD 5½" tbg. RU DA, rn 8.5" gage ring/JB to 10,128', 5.87" gage ring/JB to 10,128' & 5.7" gage ring/JB to 10,145'. Press tst 13-3/8" x 9-5/8" ann to 1000 psi. RU & rn 245 its, 5½", 17#, L-80 LTC AB Mod tbg w/Bal-O-Nipple @ 2199', FB-1 pkr @ 10,128', WD Pkr @ 10,652', WD Pkr @ 10,771' & 10,480', TT @ 10,853'. Freeze protect well, lnd tbg. Tst ann. Instl BPV. ND BOPE. NU & tst tree. RR @ 0730 hfs, 9/28/86. Perform long term tbg tst. RU DA, rn temperature and noise log. Noise log indicates two leaks; one on top of seal stinger @ top ~GasCOns. GommissBn RU S/L, pull XX plug & nipple @ 10,164'. w''-'u~0~~r.~ Aj%-L'{eneGIluaa Rn 2.75" gage bar to 10,660', POOH. Discontinue Turn well over to Production. Old TD Released rig 0730 Hrs. New TD Date 9128/86 PB Depth 11,007 ' K nd of rig Rotary Classifications (oil, gas, etc.) Oil Producing method Flowing Type completion (single, dual, etc.) Single Official reservoir name(s) Sadlerochit Potential test data Well no. Date Reservoir Producing interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. Drilling Supervisor ARCO ALaska, Inc· P O. Box t003;6¢ Anchorage, Alm~km DATE' October t4 , t986 REFERENCE: ARCO Cased HoLe Final. 1-3;2 8-20-86 ACBL/VDL/$IG/GR Run t, 5" t-33 8-t t-86 ACBL/VDL/$I6/[;R Run 3;-14 8-23;-86 PFC Log Run 7-23 9-8-86 CNL/[;R Mu [t' i=~pace Run 9-t 4 9-t 9-86 GR/Co L Lar ('rub lng Ypot F'ack) Run 9-t4 9-2¢-86 GR/Co[ Jar Log Run 9-t4 9-22-86 GR Log Run 9-34 9-t 9-86 Diff. Temp./bR Run 1, .5' t1-t6 9-24-86 CNL/GR MuLti=.~pace Run t, 5" tt-2~ 8-1t-86 ACBL/VDL/$IG/GR Run t, 5" t4-.8 8-t6-86 Production Logging ~ervice~ Run 1, 18-8 8-2~-86 GR Log Run t, 5 · PLease sign and return the attached copy a_q' receipt of data, Received By HAVE A NICE DAY! Ro~anne F'eek ATO-t 5°9~ TRAN~ $86638 DISTRIBUTION F'hi L L ip.s F:: WeLL Fi Les $ohio ~'tate of ALaska Texaco STATE Of ALASKA ALASKA ulL AND GAS CONSERVATION COMMI, ,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon - Suspend % Operation Shutdown ~ Re-enter suspended well '- Alter casing ' Time extension ~ Change approved program ~ Plugging ~ Stimulate'~Pull tubing/~Amend order -' Perforate ' Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 26' RKB 3. Address P. 0. Box 100360 Anchoraqe, AK ..99510 4. Location of well at surface 1112' FSL, 125' FWL, Seco1, T10N, R15E, UM At top of productive interval 1608, FNL, 1533' FWL, Sec. 2, T10N, R15E, UM At effective depth 1330' FNL, 1257' FWL, Sec. 2, T10N, R15E, UM Att~)~j71¢e~; h Sec. feet 6. Unit or Property name .p,.,,,~h~,,~ ~y L~ni+ 7. Well number 8. Permit number 77-25 9. APl number 50-- 029-20249 10. Pool Prudhoe Bay Pool 11. Present well condition summary Total depth: measured true vertical 11080 'MD 9197 'TVD Effective depth: measured 11007 'ND true vertical 9140'TVD feet feet feet feet Plugs (measured) None Junk(measured) Sinker bar ~ 11007' Casing Length Size Cemented Measured depth True Vertical depth Conductor 102' 20" Surface 2712' 13-3/8" Production 11049" 9-5/8" Perforation depth: measured (See Attached) true vertical (See Attached) Tubing (size, grade and measured depth) Packers and SSSV (type and measured depth) (RKB) (RKB) Pol eset 102 'MD 102 'TVD 6800 sx coldset 2712'MD 2712'TVD 1000 sx~G 11049 ' MD 9173 ' TVD R ECE I VED Alaska Oil & Gas Cons. Commjss Anchorage 5-1/2,,, 17#, L-80 (10110' to surface) 4-1/2", 12.6#, L-80 (10240' to 10110') 9-5/8" Baker SAB Packer @ 10110' 5-1/2" Otis Rqy SSSV nipple ~ 2210' 12.Attachments Description summary of proposal ~ Detailed operations program ~. BOP sketch 13. Estimated date for commencing operation September 10, 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Associate Engineer ~/ Commission Use Only (CDR) SA/102 Conditions of approval Approved by Date Notify commission so representative may witness i Approval No. ~/~ Plug integrity ~, BOP Test [] Location clearanceI ~ Y7 . '.r · ..-.-: ,?-:..- - by order of ' ';:: .'~:. .' :;; ~. Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate WELL 9-14 PERFORATION INTERVALS MEASURED DEPTH 10390 10436 10523 10560 1O667 10740 10808 10816 10850 10880 - 10420 - 10466 - 10543 - 10600 - 10727 - 10754 - 10812 - 10828 - 10869 - 10915 TRUE VERTICAL DEPTH 8660 8696 8763 8792 8875 8932 8985 8991 9017 9041 8683 8719 8779 8823 8922 8943 8988 9000 9032 9068 GDH/dmr: 102a 8-19 -86 WELL 9-14 WORKOVER PROCEDURE SUMMARY 1. Set BPV. 2. MIRU Westward Rig 3. N.D. tree. NU and test BOPE. Pull BPV. 4. Pull hanger. 5. PU overshot on DP and latch tubing. Set wireline plug in XN nipple at 10180'MD. 6. Perforate tubing at +/- IO040'MD and circulate 10.6 PPG Cacl~ out of annulus with 8.5 ppg seawater. 7. POOH with 5-1/2" tubing. 8. TIH with DP and overshot. Retrieve SBR. 9. TIH with DP and packer mill. Mill packer, chase to bottom. Clean out to original PBTD. 10. PU 9-5/8" test packer. TIH to 10300'. Test casing to 2000 psi. 11. Release packer and reset it at 10837'. 12. Stimulate the intervals 10850' - 10869' and 10880' - 10915' with the following: 1000 gal 15% Hcl 2000 gal 12/3 Hcl/HF 1000 gal 7-1/2% Hcl 750 gal gelled NH4cl w/750# BAF 1500 gal 15% Hcl 3000 gal 12/3 Hcl/HF 1000 gal 7-1/2% Hcl Displace with seawater 13. Place well on seawater injection for 12 hours. 14. TOH with test packer. RECEIVED Alacka Oil & Gas Cons, Anchorage 15. RIH w/ 9-5/8" E-Line set packer. Set at 10837'. 16. RIH w/ XN plug and set in packer tailpipe at 10837'MD to set upper packers. 17. PU 9-5/8" x 4-1/2" hydraulic/permanent packer and tailpipe w/injection hardware. Sting seal assy into packer at 10837'MD. Packer will be spaced out to set packer at 10775 'MD. Page Two Well 9-14 SUmmary 18. PU 9-5/8" x 4-1/2" hydraulic/permanent packer w/ 4-1/2" tailpipe including injection hardware. 19. RIH and locate in packer set at 10775'MD. Set packer. Packer will be spaced out such that packer is set at 10650'MD. 20. RIH w/ 9-5/8" E-Line set packer and set at 10500'MD. Tailpipe to be 5-1/2" with XN nipple. 21. PU 9-5/8" x 5-1/2" hydraulic/retrievable packer and 5-1/2" completion string. 22. RIH to IO000'MD. 23. Set WL plug in X nipple. Set packer test tbg. Shear seal assy, pull all WL plugs. 24. Land tubing. 25. Set BPV. ND BOPE. NU tree and test. 26. Release rig. Pull BPV. NOTE' Bottom hole pressure = 3950 psi @ 8800' ss Workover fluid will be NaCl brine weighted to keep the well overbalanced. NaC1 kill pills will be used as necessary. GDH/dmr'lO2b 8-20-86 RECEIVED ,~,as,(a Oil & Gss Cons, Comm!ssi~n 1 - " PI P 5ZA_C] ANNULAR PREYGENTER BLIND RAHS 5 PIPE RAMS 4 TUBING HEAD ~5 2 I ~ ~-~"~ ...... "NG HEAD 2, 9-5/8" CASING HEAD = 5000 '-"-' "q _,. ~.:,t ~ .,....,,NG ,HEAD 4 1':r .... ,..;-$,'~ - 5000 PS1 ~,n~ RAMS _,-~/~_, =,'~r,,~ PSi P, LiND 6. 1=.~-.J/= ":o .... - 50,:)0 PS! ANNULAr. ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCLIMULATOP, RESERVOIR TO PROPER LEVEL WITH HYDRA~JLIC FLUID. 2. ASSURE THAT ACCUMULATOR P¢!ESSURE IS 5000 PSI WiTH !500 PS1 DOWNSTREAM OF THE qEGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTE~ ALL UNITS ARE CLOSED WiTH CHARGING PLtMP OFF 4. RECORD ON THE IADE REPORT. THE ACCEPTABLE LOWER LIMIT iS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP ST ACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCT;C DIESEL. ~ : I I , '--L/. 21 CHECK THAT A~ HOLD-DOWN SCREWS APE FULLY PETPAC-:c' PP, EDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WcLcHEAD. RUN iN LOCK-DOWN SCREWS !N HEAD. 5, CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE ~* ~,~r,~ m 4. TEST ALL COMPONENTS TO 250 PSt AND HOLD FOR i0 MINUTES. 5. ~NCxEA.~E PRESSUPE TO. ~o00, ~e, AND HOLD ,;OR BLEED TO ZE~O PSI. OPEN ANNULA~ oD~ti~ki~D AND m, ~SE ~(-,c, SET r,; !N~EAc, E' ~rn o ~'~FH:EC¢:~UR: ..... T(fi. _ 3000 PSi AND HO_.D FOR i O MINUTES. PStESSURE T¢~_ ZEqO PSi TO TEST VAL'/ES. --':'~ :._,, PEHA!NiNG Ur.tTESTED "- ~"'"'0 C'cl 'mc~D;Ahl 0 MANrF~ r~ VALVES. ~ ANY, WiTH ...... v WiTH ZERO PSi DOWNSTREAM...P. LEED ,-,,c~ ~TEM TO ~R~" n p~,',". (lBSN DiC,~ ~A?!?. ~A~'~''r]~c PLiNN'.Nr~ ~ AND :DULL ~,~, ,"!n,:¢ BLIND- kal ,~ AND TEST Tq ~""' ~ .... ~ . ~v(,OPSi FOR 10 MINUTES. ~.LEED TO ZE~O I0 OPeN ~.Lif-iD m,r-,~ AND Pc"O~,'~P T¢'z.T PLiJr3 MAF. E SURE r~ANiFOLD ~L~ ~E FSF Api*TC. DiFq~! AND AL' """ ~'''cc APE'~ETiN ThE DRILLING POSiTiON, I ~ TEc~STANDp~pE VALVES T(~ ** i2 TEST KELLY '" '"' P':i W~TH . uOCk-~ AND iNSIDE BOP TO 5(:'00 1~ .... ~ECOPD TEST iNFOPP~A~ON., r,~..,, _,~,' (-~W,.'&iT. _ P~'EVENTE;' TE?.T AND SEND TO DRILLING ':;~. ,_,.'P¢c'viSOP...., C ElY E D 'G ,;UNE 16 1936 Alaska Oit& Gas Cons, Uommlssiori ' Anchorage, STATE OF ALASKA ALASK.. OIL AND GAS CONSERVATION COMN. ..,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [ ] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate i I Other I.~ i~..~; 2. Name of Operator ARCO Alaska, In¢, 3. Address Post 0ffice Box 100360, Anchorage, AK 99510 4. Location of well at surface 1112'N & 125'E of SW cr Sec. 1, TION, R15E, UN At top of productive interval 1112'N & 125'E of SW cr Sec. 1, TION, R15E, UN At effective depth 1608'S & 1533'E of NW cr Sec. 2, TION, R15E, UM At total depth 1297'S & 1225'E of NW cr Sec. 2~ TION~ R15E~ UM 11. Present well condition summary Total depth: measured 11080 feet Plugs (measured) true vertical 9131 feet 5. Datum elevation (DF or KB) 54' RKB feet 6. Unit or Property name Prudhoe Ba,v Unit 7. Well number DS 9-14 (11-2-10-15) 8. Permit number 77 -25 9. APl nurr~e¢ 5o- -20249 10. Pool Prudhoe Bay 0il Pool Effective depth: measured 10934 feet Junk (measured) true vertical 9018 feet Casing Length Size Structural Conductor 102 ' 20" Surface 2712' 13-3/8" Intermediate Production 11049' 9-5/8" Liner Cemented Measured depth True Vertical depth 267 sx Arctic Set 2875 sx Arctic Set 102' 102' 2712' 2712' 800 sx Class G 11049' 9107' Perforation depth: measured 10390'-10420', 10436' -10466', 10523'-10543', 10560' -10600', 10667'-10727', 10740'-10754', 10808'-10812', 10816'-10828', 10850'-10869', 10880'-10915 true vertical 8600' -8623', 8636' -8659', 8702' -8718', 8731' -8762', 8813' -8859', 8869' -8880', 8921' -8925', 8928'-8937', 8954' -8968', 8977'-9004' Tubing (size, grade and measured depth) 5½" 17# L-80 to 10061'MD; 4½" 12.6# N-80 to 10240' Packers and SSSV (type and measured depth) Packer-Baker SAB @ 10110'MD, SSSV - Otis ROY @ 2210'MD 12.Attachments Description summary of proposal [] Detailed operations program [-] BOP sketch Ii 13. Estimated date for commencing operation 14. If proposal was verbally approved Name of approver Co V o Chatterton Date approved 8/5/86 Signed//~¢~' ~ ~,~_¢// ///'/~ Title Operations-Engineering Mana.qer Commission Use Only Conditions of approval Notify commission so representative may witness Approved by Date [] Plug integrity [] BOP Test [] Location clearance ,;:~.~p rovec~ Cop'?' P,~turn~d ~, Commissioner by order of ~ //_~ the commission Date ~ Form 10-403 Rev 12-1-85 FEB (263-4261) Submit in triplicate Attachment to Application for Sundry Approvals DS 9-14 Per the instructions received during our meeting with the commission on August 5, this is to document the conditions and plans for this well. The tubing of this well is parted at 13'. This tubing will be replaced as soon as a workover rig is available. Per commission approval on August 5, injection into this well will continue to minimize excessive surface shut-in pressure. INJECTION WELLS WITH ANNULAR COMMUNICATION EOA - PRUDHOE BAY FIELD. Wel 1 Max. Injection Rate During Last 3 Months ~ (BWPD) .._....----- 3-11 AY~? 8000 3-12 b/~ P 33000 3-17 p~mt,'c 19000 9-12 ?/~,'~- 16000 9-14 /ua~-/~ 36000 q-17 /~ P 27000 9-19 /vol P 28000 16-2 ?/~s~ 7000 16-11 ?1~,~_ 7000 ~,1N4/16 Surface Pressure at Maximum Rate (psig) Tbg 9-5/8" Csg 13-3/8" Cs0 1200 1200 0 1100 1100 400 800 800 100 90O 900 0 1300 1100 1300 20O 1100 0 1200 1200 0 800 1200 0 1100 1400 200. Probability of Passing State Test l~Low ~a~4edium i~Medium ~'~None ~ Hi,gh , · edium Comments 9-5/8" pressure responds immediately to changes in tubing pressures Bled 9-5/8" pressure from 875 to 455 pstg in 3 minutes, built up 80 psi in 1 hour, built back up to 860 psi in 20 hours. Bled 3 Bbls oil and gas from 9-5/8" in 10 minutes, pressure decreased from 1050 to 200 psi, built up 120 psi in 1 hour built back to 1000 psi in 18 hours. Bled 9-5/8" pressure from 795 to 350 psi, built up 200 psi in 1 hour, built back to 800 psi in 5-1/2 hours. Parted tubing at 13'. Bled 9-5/8" pressure from 625 to 250 psig, built back to 625 psi tn'l hour. Bled 10 gals of H~O' from 9-5/8" pressure decreaseU from 220 to ~ pstg, built up 80 psig in 4 hours. , Bled 40 gals diesel from 9-5/8", pres- sure decreased from 880 to 5.00 p$ig, built up 50 psi in I hour, built back to 850 psig 'in 10 hours. Has gas lift mandrelS' 9-5/8" pressure responds immediately to changes in tubing pressure. Has gas lift ma nd rels. 9-14 WELL: SURFACE LOCATION: BOTTOIM HOLE LOCATION: .ORIGZNAL RKB: TOP OF SADLEROCHIT: ALL DEPTHS ARE RKB MO Depths are to TOP of equil~ent 'ATE: 7/16/77 II12' N & I25' £ of SW ct. Sec. 1, TION, R15E, UM 1297' S & 1225' E of NW ct. Sec. 2, TION, R15E, UM 54' RKB 'TO OCT 10382 ' HO _ HOLE ANGLE THROUGH SADLEROCHIT: COMPLETION RUN: 8/19/77 AP[ # 50-029-20249 HANGER 26' 39o 5~", 17J, L-80 NOT Plastic Coated Tubing 5~" x 9-5/8" An-'~lus Fluid 10.6 CaC12 & Diesel 2210' Otis RQY SSSV Nipple ID 4.562" !397' 9-5/8" FO )526' 9-5/8" FO 2712' 13-3/8", 72#, MN-80 w/ 6800 sx 9980' Otis XA sliding Sleeve 10054' Otis XN Nipple ID 4.455" 10061' Baker SBR AssemblT, 10110' Baker SA8 Packer 10180' Otis XN Nipple ID 3.725" 10239' Baker Shear'Oat Sub 10240' Bottom of 4~", 12.6#, N-80 Tailpipe DATUM: 10639' MD ' 8854' TVD - 8800' SS 10390' - 10~20' 8EC$ 8/A/77 t0&36' - 10~66' " " 10523' - 10543' " " 3 10560' - 10600' " " 3 10667' - 10727' " " 2 10740' - L0754' " " 2 10808' - 10812' " " 2 10816' - /0828' " " 2 108§0~ - 10869' " " lB 10880' - 10915 ..... lB FT SPF 3O 4 3O 4 2O a 60 ~ 19 4 AUG--! 1986 Alaska Oil & Gas Cons. Anchorage Add Perf 9/10/84 It Pe:f'd LI/19/77 ?erf'd 11/18/77 ii II Add ?err 4/6/8a FISH IN HOLE: 15', 2 centralizers, 2 sinker bars 11007' PBTD 11049' 9-5/8", 47#, N-80 & Rs-g5 w/ 1000 sx 11080' TD 4/84 10/84 Well Max. Injection Rate During Last 3 Months -~ ('BWPD) '/ 3-11 AYe6? 8000 3-12 b/~ P 33000 3-17 pi~,'c. 19000 9-12 i'~/,~mL,'~. 16000 9-14 /~af- f') 36000 q-17 /a~. P 27000 9-19 /romp 28000 16-2 ?/~s~ 7O0O 16-11 ?l~_ 7000 !1,1N4/]6 INJECTION WELLS WITH ANNULAR COMMUNICATION EOA - PRUDHOE BAY'FIELD. Surface Pressure at Maximum Rate (psig) Tbg 9-5/8" Csg 13-3/8" Csg 1200 1200 0 400 1100 1100 Probabi 1 i ty of Passing State Test ~a/~Low ~4edium 800 800 100 i~Medi um 900 900 0 1300 1300 200 1100 1100 0 v':,-None ~Low 1200 1200 0 ~ Hi.gh . 800 1200 0 i~edium 1100 1400 200· Commen ts 9-5/8" pressure responds immediately ¢,~/'~,'/ to changes in tubing pressures Bled 9-5/8" pressure from 875 to 455 pstg in 3 minutes, built up 80 psi in 1 hour, built back up to 860 pst tn 20 hours. Bled 3 Bbls oil and gas from 9-5/8" in 10 minutes, pressure decreased from 1050 to 200 psi, built up 120 psi in I hour built back to 1000 psi in 18 hours. Bled 9-5/8" pressure from 795 to 350 psi, built up 200 psi in 1 hour, built back to 800 psi tn' 5-1/2 hours. Parted tubing at 13'. Bled 9-5/8" pressure from 625 to 250 psig, built back to 625 psi in'l hour. Bled 10 gals of H~O: from 9-5/8", pressure decreaseU from 220 to 0 pslg, built up 80 psig in 4 hours. , Bled 40 gals diesel from 9-5/8", pres- sure decreased from 880 to 5·00 pstg, built up 50 psi in 1 hour, built back to 850 psig in 10 hours. Has~ gas lift mandrelS· 9-5/8" pressure responds Immediately to changes in tubing pressure. Has gas lift mandrels. 9-I4 SPq~,~TE: 7/16/77 1112' N & 12S' E of SW ct. Sec. 1, T]~, R1SE, Ulq I297' S & 122~' E of NW ct. Sec. 2, TION, RISE, i RIr~ TO OCT HOLE ANGLE ,~iROUGH SADLEROOIIT: C~Pt. ETION ~N: 8/19/77 APl ~ 50-029-20249 HANGER 390 5~,', 171. Lo80 N~T PlasCtc Coated Tubtng 5~,' x g-5/8' ~-'~lus Flutd 10.6 cae12 & Otesel 2210' Otts RQ¥ SSSV Ntpple ID 4.562' ' 9-5/8' FO ' 9-5/8' FO 2712' 13-3/8', 72j, MN-80 w/ MOO sx 26' 9980' ~ts XA S11dtng Sleeve 10054' Otts XN Ntpple ID 4.455' 10061' Baker SBR Assembly. 10110' Baker SAB Packer 10180' ~ts XK Ntpple ID 3.725' 10239' Baker Shear'O Jr Sub 10240' BoCCem of 4~', 12.6J, N-80 TaJlptpe DATUM: 10639' MD - 8854' TVD · 8800' SS 10390* - 10420' 10436' - ~0466' " 10523' - 10~3" " . 3 20 ~0~60' - 10600' " " 3 40 4 10667' - 10727' " " 2 60 4 lOT&O' - 107.r~' ". 10808' - 10812' " 10816' - 10828' " 10850' - 10869' ' 10880' - 10915' . . IB 35 FISH IN HOLE: 15', 2 centralizers, 2 sinker bars 11007' PBTD 1104~' ~-~/B', 474, N-80 & R$-~$ w/ lOO0 sx 110~0' TO Add Perf 9/10/84 Perf'4 11/19/77 Pirf'd 11/18/77 it Il Add Pecf 416184 4/84 10/84 ARCO Alaska, Inc. Post Office B,~,~ t00360 Anchorage, Alaska 99510 Telephone 907:276 1215 October 14, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 Permit No. 77-25 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS:JEB:dp Attachment cc: SOHIO Alaska Petroleum Co. File PI(DS 9-14)Wl-3 RE,EEIVED G~s Cons. Commissio~ Anchorage ARCO Alaska, Inc. is a Subsidia,,-y of AtlanticRichfieldCompany STATE OF ALASKA ALASKA O~L AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. BOX 100360, Anchorage, Alaska 99510 4. Location of Well (Surface) ll12'N & 125'E of SW cr Sec 1, T10N, R15E, UM (Producing Interval) 1608'S & 1533'E of NW cr Sec 2, T10N, R15E, UM (Total Depth) 1297'S & 1225'E of NW cr Sec 2, T10N, R15E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 7. Permit No. ??-25 8. APl Number 50--029-20249 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate E~ Alter Casing [] Perforations Stimulate I~ Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska intends to squeeze existing perforations and perform a profile modification treatment on DS 9-14. These operations will be done using a Coiled Tubing Unit (CTU) in the following manner: 9 1. MI and RU CTU 2. RIH to PBTD and place mud retainer in the rathole 3. Perform the cement squeeze. 4. Contaminate the cement in the wellbore with a borax-bentonite mixture. 5. Reverse out the contaminated cement and clean out the wellbore. 6. Reperforate the following intervals: 10390'-10420' MD 10436'-10466' MD Ref: BHCS 8-4-77 7. Stimulate the well with the following solutions: -5000 gallons of 15% HCL -6000 gallons of 12% HCL & 3% HF -1000 gallons of gelled NH4C1 water with 1000 lbs. of benzoic acid flakes. 8. Reperforate the following intervals: ~ ~ ~IVED 10808'-10812' MD 10816'-10828' MD 10850'-10869' MD 10880'-10915' MD Ref: BHCS 8-4-77 Test the well. ~,tus~ ~,~ ~ u~s C0[ls. C0mmissi0r~ Ar~ch0rage 14. I hereby/~rtify that the,~orep,~ing is t.r. ue and correct to the best of my knowledge. Signed -v -.~ ' Title Re91onal Operat±ons gngi~eer The space below for Commission use Date Conditions of Approval, if any: Approved by COMMISSIONER I~lfUnl~d By Order of the Commission Form 10-403 R~,v 7-1-R0 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska. Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: June 5, 1985 Reference: ARco CH Finals 3-16 Spinner/CCL 5-3-85 Run 1 5" GO ~9-14 Spinner 5-4-85 1 5" GO , 9-15 Spinner 5-4-85 1 5" GO 9-28 CBL 4-23-85 1 5" GO PLease sign as receipt of da~2~~ "' Received by '~.. 0~.~2 . A TO 14 2 9 C ~ ~ ' Trans 134 Chevron D & M Phillips Expl. Services PB Well Files Ext. Exploration R & D Exxon Sohio Marathon State of Alaska Mobil Texaco ARCO Alaska, Inc, Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date- May22, 1985 Reference: Arco'Ch Finals 9-14 Spinner Run 1 5" 5-9-85 Camco -.. 9-15 Spinner I 5" 5-9-85 ._ Camco please sign as .eipt d t R~C ~ Alaska 0ii & Gas Cons. Commission Anchorage Pam Lambert ATO 1429c Trans 116 D & M Marathon Phillips PB Well Files R & D Sohio Texaco ARCO Aiaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 .Telephone 907 276 1215 Date: February 18, 1985 Reference' ARCO Pressure Reports ~3-13 Pressure Data 12-14-84 GO 9-12 Pressure Data 12-17-84 GO ~i!~~ Pressure Data 12-19-84 GO 16-3 Pressure Data 12-12-84 GO Please sign and return the attached copy as receipt of data. Received by Pam Lambert ATO 1429C Trans# (~)~ Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, Inc. Prudhoe Bay E leering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 22, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil 'and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-6 DS 3-7 DS 3-10 DS 3-18 DS 4-6 DS 4-8 DS 4-11 DS 4-14 DS 4-15 DS 9-8 DS 9-10 DS 9-12 DS 9-14 DS 9-15 DS 9-16 Permit # 76-60 Permit # 76-53 Permit # 79-21 Permit # 79-103 Permit # 76-42 Permit # 76-10 Permit # 78-6 Permit # 78-36 Permit # 78-37 Permit # 76-70 Permit # 76-82 Permit # 77-7 Permit # 77-25 Permit # 77-36 Permit # 77-37 DS 9-18 DS 9-17 DS 9-19 DS 9-20 DS 11-2 DS 16-1 DS 16-2 DS 16-3 DS 16-5 Permit # 77-39 Permit # 77-38 Permit # 77-40 Permit # 77-41 Permit # 81-128 Permit # 80-136 Permit # 80-150 Permit # 76-83 Permit # 81-37 DS 16-10 Permit # 80-04 DS 16-11 Permit # 80-118 DS 16-16 Permit # 80-127 DS 17-6 Permit # 80-132 DS 17-8 Permit # 81-74 DS 17-10 Permit # 81-97 Dear Hr. Chatterton: Attached are Subsequent Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. S cheYe E C E ! V E O At t achment s JAN 2 cc: Sohio Alaska Petroleum Company Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA ALASKA UIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL]~I 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-25 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20249 OTHER [] 4. Location of Well 1112'N & 125'E of SW cr Sec. 1, T10N, R15E, [~4 9. Unit or Lease Name Prudhoe Ba.v Unit 1608'S & 1533'E of NWcr Sec. 2, T10N, R15E, UM 1297'S & 1225'E of NWcr Sec. 2, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 54' RKB ADL 28327 10. Well Number DS 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. has converted DS 9-14 to water injection service. The well is part. of the Flo%~ Station 2 waterflood project. The well began receiving water on June 14, 1984. 14. I hereby ce, r~fy that the foreg~g is tr.ue and~.,grrect to the best of my knowledge. The space below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date ..................... Form 10-403 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate ALASKA OIL AND GAS CONSERVATION COMMISSION ~ 3OOl PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 December 27, 1984. / TELEPHONE (907) 279-1433 A D M I N I S T R A T I V E A P P R O V A L N O. 192.9. Re: Substitution of pressure fall-off surveys in five injection ~wells for transient pressure surveys in producing wells as required by Rule 6(d) of Conservation Order No. 165. Mr. D. F. Scheve Regional Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Dear Mr. Scheve: On December 6, 1984 ARCO Alaska, Inc. requested pressure fall-off surveys in Prudhoe_Bay Unit water injection wells DS 3-13, DS 9-12, DS 9-14, DS 16-3, and DS 17-8 be accepted to satisfy requirements of Conservation Order No. 165, Rule 6(d). At a meeting with ARCO representatives, December 26, 1984, data were submitted which demonstrate that appropriate reservoir pressure data for reservoir management can be obtained from a four hour minimum pressure fall-off survey in injection wells. The Alaska Oil and Gas Conservation Commission hereby approves the substitution~of four hour minimum pressure fall-off surveys in Prudhoe Bay Unit water injection wells DS 3-13, DS 9-12, DS 9-14, DS 16-3, and DS 17-8 to satisfy requirements of Conservation Order No. 165, Rule 6(d). This action is taken pursuant to Rule 2 of Conservation Order No. 192. Yours very truly, Commissioner BY ORDER OF THE COMMISSION HWK/RAD:be: 1.AA 1'92 9o'=' ~; .. ., f -: --'"' !>_.Z'V/t: - : ; ? : . ........................................................... A '7' 0 ..... - ,.,.:... ARCO Alaska, In~ Prudhoe B~.x Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 12, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 DS 9-16 DS 9-18 Permit No. 77-25 Permit No. 77-37 Permit No. 77-39 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/la Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 9-14)W4-3 Pi(DS 9-16)W4-3 Pi(DS 9-18)W4-3 ARCO Alaska, Inc. is a Subsidiary of AllanticRIchfleldComl3any STATE OF ALASKA ALASK,..,L AND GAS CONSERVATION (_ ,MISSION (./~ · WELL COMPLETION OR RECOMPLETION REPORT AND LOG ?'/ 1. Status of Well Classification of Service Well Water Injector OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICL~[-I .. :2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 77-25 3. Address " 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20249 , , , 4. Location of well at surface 9. Unit or Lease Name ll12'N & 125'E of SW cr, Sec. 1, Ti0N, R15E, UM Prudhoe Bay Unit At Top Producing Interval i0. Well Number 1608'S & 1533'E of NW cr, Sec. 2, T10N, R15E, UM DS 9-14 At Total Depth ~ 1. ~ield and Pool 1297'S & 1225'E of NW cr, Sec. 2, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF', etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 54' RKB ADL 28327 12. Date Spudded 13~ Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 7/16/77 8/4/77 8/22/77 (perfed 11/22/77) feet MSt Single 17' T°tal Depth (MD+TVD)18'Plug Back Depth (MD+TVD)19' Directi°na' SurveYll080'MD 9199'TVD ll007'MD, 9142'TVD YES IX] NO [] I20' Depth where sSSv set2193 feet MD I21' Thickness °f Permafr°stlg00' (approx.) 22. Type Electric or Other Logs Run DIL/BHC/GR, EDC/CNL/GR, CNL/GR/CCL, CCL, EDt 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 96#Weld H-40 Surf. 102' 30" 258 sx Arctic set II cmt 13-3/8" 72~AButt MN-80 Surf. 2712' 17%" 5500 sx Arctic set cmt , 9-5/8" 47~AButt N-80 Surf. 11049' 12~" 1000 sx Class G cmt RS-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10850-10869' MD *10390-10400' MD 5% 8,729' 8,589' 10816-10828' MD *10400-10410' MD 10808-10812' MD *10410-10420' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10740-10754' MD *10446-10466' MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10667-10707, MD *10523-15043' MD "' 10880-10915' MD *10560-10580' MD " 8539-9004' TVD *10580-10600' MD *Added 9/10/84 w/4 sPf , 27. PRODUCTION TEST Date ~ ~rgt/l~oduction [ Method Of FutureOperatiOninjector(FIowing, gas lift, etc.} I _ Date of T'est H°ursTested [PRODUCTION FOR OIL-BBL GAs-MCF WATER-BBL cHOKESIZE IGAS-OILRATIO N/A TEST PERIOD [[~ Flow Tubing Casing Pressure CALCULATED OIL'-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (cDr'r) Press. 24-HOUR RATE , , 28. CORE DATA ,, Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .. Alaska Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS 'FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 10382' MD 8655' TVD Base Sadlerochit 10951' MD 9097' TVD 31. LIST OF ATTACHMENTS 3~2. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed_~ _~?_~~'~"~- Title Regional Engineer Date /¢'~°~7 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Fnrm I ¢}-4¢17 ARCO Alaska, Ir Prudhoe b=y r-ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 11, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-14 - Permit No. 77-25 DS 9-16 - Permit No. 77-37 DS 9-18 - Permit No. 77-39 Dear Mr. Chatterton: Enclosed are "Subsequent" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/mjb Attachments CC: SOHIO Alaska Petroleum Co. File Pi(DS 9-14)W1-3 File Pi(DS 9-16)W1-3 File Pi(DS 9-18)W1-3 Alaska Oil & Gas Cons, commission Anchorage ARCO Alaska, Inc. i8 a Subsidiary of AtlantlcRIchfieldCompany -- - ..... STATE OF ALASKA - ' ..... ALASi' .,. - AND GAS CONSERVATION _ .,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 7. Permit No. 77-25 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Welt (Surface) ll12'N & 125'E of SW cr Sec. 1, T10N, R15E,UM (Producing Interval) 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E,UM (Total Depth) 1297'S & 1225'E of NW cr Sec. 2, T10N, R15E,UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB I ADL 28327 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 8. APl Number 5O- 029-20249 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Welt [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 9/10/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 10580' - 10600' MD (4 spf). Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval 10560 - 10580' MD (4 spf). Shut-in well, POOH, all shots fired. RIH with gun #3, shot interval 10523 - 10543' MD (4 spf). Shut-in well, POOH, all shots fired. RIH with gun #4, shot interval 10446 - 10466' MD (4 spf). Shut-in well, POOH all shots fired. RIH with gun #5, shot select fire intervals 10436 - 10446 and 10410' - 10420' MD (4 spf). Shut-in well, POOH, all shots fired. RIH with gun #6, shot interval 10400' - 10410' MD (4 spf). Shut-in well, POOH. RIH with gun #7, shot interval 10390 - 10400' MD (4 spf) POOH, all shots fired. Ran SSSV, secured well, RD. REF: BHCS 8/4/77 RECEIVED Alaska 0il & Gas Cons. Commission Anchorage 14. I hereb~tify that;~,~reg°~)~s t r~ ,n: ;rrecl to the , ned The space below for Commission use best of my knowledge. Title Regional Engineer Date Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer August 28, 1984 Mr. C. V( "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9~14 - Permit No~ 7~25 DS 9-16 - Permit No. 77-37 DS 9-18 - Permit No. 77-38 Enclosed are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/mjb Attachments CC: SOHIO Alaska Petroleum Co. File Pi(DS 9-14)W1-3 File PI(DS 9-t6)W1-3 File Pi(DS 9-18)Wl-3 RECEIVFq AUG; o ]984 Alaska 0il & Gas .. ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldConlpany --.~ ......STATE OF ALASKA - - ALASI ,. . ,. AN D GAS CONSERVATION _ .,MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL[] COMPLETED WELL OTHER [] 2. Name of Operator_ ARCO Alaska, Inc. 3. Address P.'O. Box 100360, Anchorage, Alaska 99510 4. Location of Well t o ~- ~- c~.~ ) ll12'N & 125'E of SW cr Sec 1, T10N, R15E,UM (Producing Interval) 1608'S & 1533'E of NW cr Sec 2, T10N, R15E,UM (Total Depth) 1297'S & 1225'E of NW cr Sec 2, T10N, R15E,UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 7. Permit No. 7?-25 8. APl Number 50-- 029-20249 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool (Submit in Triplicate) Perforate '{~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations to DS 9-14 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10390 - 10420' MD (30') 10436 - 10466' MD (30') 10523 - 10543' MD (20') 10560 - 10600' MD (40') REF: BHCS 8/4/77 RECEIVED AUG '~ 0 1984 14. t hereb/'~ertify that the foregoing is true and correct to the best of my knowledge. Signed--.. . . ._ Title Recjional Enqineer The space below for Commission use Date Conditions of APproval, if any: Approved by COMMISSIONER Approved Copy ..Returned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, h Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 August 1, Reference: 1984 ARCO Cased Hole Finals D.S. 2-17'~/ 5-23-84 D.S. 7-19-'-- 6-15-84 D.S. 9-14~ 7-20-84 D.S. 9-15 7-20-84 D.S. 9-16 7-21-84 D.S. 9-17 ~'~ 7-21-84 D.S. 9-20/' 7-19-84 D.S. 11-7~'- 6-15-84 D.S. 13-27 6-2-84 Basket Flowmeter Spinner Spinner Spinner Spinner Spinner Spinner CN/MSN/GR Diff Temp Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 11 5" 5" 5" 5" 5" 5" 5" 5" Camco Otis Camco Camco Camco Camco Camco DA GO ~Please data. sign and return the attached copy as receipt of Kelly McFarland ATO-1429F Trans. #302 D ISTRIBUT ION Chevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon .~ .-~ /~ , ,~ Mob i 1 Mobil E & P ',' ~'v (:°n~m~"'o~ ' '~ :'/, Yf'";rv , Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohio State of Alaska ARCO Alaska, In( Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 13, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9 Water Injectors Permit Nos: 76-70, 76-82, 77-7, 77-25, 77-36, 77-37, 77-38, 77-39, 77-40, 77-41 Enclosed are the Sundry Notices for Change of Well Status for the proposed Drill Site 9 Water Injectors. Very truly yours, D. F. Scheve DFS:SDC:kg Enclosures cc: SOHIO Alaska Petroleum Co. RECEIVED JUN 1 1984 Alaska Oil & Gas Cons. Commission Anchorage AR~__('~ Aleab. In~ |l ~ ~lJh~|d|mru n| AIIAnllcl:ilchileldComoanv STATE OF ALASKA ALASKA,. _ AND GAS CONSERVATION Ct MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL[] OTHER 7. Permit No. 77-25 50- 029-20249 9. Unit or Lease Name 1. 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well ll12'N & 125'E of SW cr Sec. 1, T10N, R15E, UM 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E, UM 1297'S & 1225'E of NW cr Sec. 2, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 54' RKB 6. Lease Designation and Serial No. ADL 28327 Prudhoe Bay Unit 10. Well Number DS 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [~ Pulling Tubing (Note: Repert multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to change Well 9-14 status from oil producer to water injector. It will be operated as part of the Prudhoe Bay Waterflood Project. RECEIVED JUN 1 4 ]984 Alaska Oil & Gas Cons. Commission Anchorage '14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title Regional Engineer Conditions of Approval, if any: ORIGINAL SIGNED BY l~H"IE C. SMITH Approved by. COMMISSIONER Date Approve¢/-~ Returned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 10, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9~t4 DS 9-17 DS 9-18 DS 9-20 Permit No. 77-25 Permit No. 77-38 Permit No. 77-39 Permit No. 77-41 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/la Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 9-14,17,18,20)W4-3 RECEIVFD MAY 1 6 i984 Alaska 0il & ~,?,s Cons. Commission ARCO Alaska, Inc, Is a Subsidiary of AtlantlcRIchfleldCompany WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICEI~ Water Injector 2. Name of Operator 7. Permit Number / ARCO Alaska, Inc. 77-25 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50-029-20249 4. Location of well at surface 9. Unit or Lease Name 1112'N & 125'E of SW cr Sec. 1, TiON, R15E, UM Prudho¢ Bay Unit At Top Producing Interval 10. Well Number 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E, UM DS 9-14 At Total Depth 11. Field and Pool 1297'S & 1225'E of NW cr Sec. 2,TZON, RL5E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 54' RKB ADL 28327 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 7-16-77 8-4-77 8-22-77 (nerf'd 11-22-77')11 feet MSLI 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost ll080'MD, 9199'TVD 11007 'MD, 9142'TVD YE~] NO [] 2193 feet MD ] 900 ' 22. Type Electric or Other Logs Run DIL/BHC/GR. EDC/CNL/GR. CNL/GR/CCL. eCL. EDL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESlZE CEMENTING RECORD AMOUNT PULLED ~O" q6~ Weld ~-~.n Surf. !02' 32" 267 sx Arctic Set cmt ] 3-3/m' ??~ m_~tt ~4~-80 .q,,~¢ 971 9, 17%" 6800 sx Arctic Set cmt RS-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10850-10869 ' MD 5½" 10,240' 10115 ' 10816-10828 ' MD 10808-10812' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10740-10754' MD 8778-9004' TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10667-10707 ' MD 10880-10915 ' MD added 4/6/84 w/4 shots per ft. 27. PRODUCTION TEST ..... Date First Production Method of Operation (Flowing, gas lift, etc.) 2/4/78 Future Injector Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO N/A TEST PERIOD ~ I . Flow Tubing Casing Pressure CALCULATED.1~ OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 24-HOUR RATE ~' 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cor~i~;;;~.,~ .... ~<, Oil & ('.>:.~, Cons. Co;'nmission Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 301 ..... . GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 10382' MD 8655' TVD Base Sadlerochit 10951' MD 9097' TVD 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~~/~~. ' v - . Title -Regiona! Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Fnrm 1 N-ANT ARCO Alaska, In Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 9, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 9-14 DS 9-17 DS 9-18 DS 9-20 Permit No. 77-25 Permit No. 77-38 Permit No. 77-39 Permit No. 77-41 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/la Attachments cc: SOHIO Alaska Petroleum Co. File Pi(DS 9-14,17,18,20)W1-3 ARCO Alaska, Inc, is a Subsidiary of AflanflcRIchfleldCompany ..... STATE OF ALASKA '-- ALASKA, _ AND GAS CONSERVATION CL. MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELk [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-25 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20249 4. Location of Well ll12'N & 125'E of SW cr Sec. 1, T10N, R15E, UM 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E, UM 1297'S & 1225'E of NW cr Sec. 5. Elevationinfeet(indicateKB, DF, etc.) 54' RKB 2, T10N, R15E, UM 6. Lease Designation and Serial No. ADL 28327 OTHER [] 9. Unit or Lease Name Prudhoe Bay .Unit 10. Well Number DS 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ,~] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 4/6/84. RU perf unit, pressure tested equipment. RIM with gun ~1, flowed well, shot 10895-10915' MD 4 spf (Ref: BHCS 8/4/77), shut in well, POH, all shots fired. RIH with gun #2, flowed well, shot 10880-10895' MD 4 spf, shut in well, POH, all shots fired. MAY 1 5 ]984 0ii & {:;;:,~ Cons. Commission 14. I hereby c_ertify that th~for~going is true and correct to the best of my knowledge. Signed .,~ ~~/)~----~ Title Regional Engineer The space below for Commission use Conditions of APproval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office F*-' 360 Anchorage,, xa 99510 Telephone 907 277 5637 April 26, 1984 Reference: ARCO Cased Hole Finals P.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S D S D S D S D S D S D S D S D S. ---D S. --.D S. D S D S D S D S D S D S D S DS. !D~ S . ./ 1-25 J' 3-18-84 3-19'~ 4-7-84 3-22 J 4-7-84 3-23 ~'~'~ 4-7-84 5-9 -~"' ..... 4-8-84 ---" 7_16~' 3-10-84/~ 9-14''~ 4-6-84 9-17f' 4-6 -84/ 9-20 -~'-' 4-6-84 9-21 ~' 1-11-84- 9-23 f' 3-8-84./ 9-25' 4-2-84 / 12- 26.~".~2-19-84/ 12-27/~3-6-84 12-28/ 3-28-84 12-28~ 3-30-84 13-11 4-4-84 ~ 13-11 4-4-84 13-98 5-8-83/ . 13-98 3-16-84/ 13-98 no date" 13-98 11-12-83 13-98 no date 13-98 2-13-84 13-98 2-19-84 13-98 2-18-84 13-98 3-30-84 t3-98 2-14-84 PFC/GR Collar/Perf Collar/Perf Log Collar/Perf Log CFS/Temp Survey EPL Collar/Perf Log Collar/Perf Log Collar/Perf Log ACBL/VDL/Signature/GR ACBL/VDL/Signature/GR Epilog/Sandstone Analysis ACBL/VDL/Signature/GR ACBL/VDL/Signature/GR ACBL/VDL/Signature/GR Collar Log (used to cut tubing) Collar/Perf Log Diff Temp . Epilog/Carbon-Oxygen 5-pass overlay CPL/GST/DIL (3 runs) w/listing Epilog/overlay avg. CO, SI/CA, SW Epilog/Carbon-Oxygen 6-pass overlay Epilog/Compare Induction Curves Epilog/Carbon-Oxygen 5-pass overlay GST Inelastic & Stations 5" DA Run ALL 5" GO Run 1 5" GO Run ALL 5" GO ~ 13-98 2-16-84 ' 14-32~ 4-1-84/? Collar/Perf Log S. 16-5 ~ 3-10-84/' Completion Record se sign and return the attached copy as receipt of data Have a Nice Day! Run 3 5" GO Run 1 5" Sch Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" DA Run 1 5" DA 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" GO Run 1 5" GO Run 1 5" GO 5" DA 5" Sch 5" DA 5" DA 5" DA 5" DA Run 3 5" Sch Kelly McFar land ATO-1429F Chevron GST Capture & Activiation Run 3 5" Sch CH DIL Run 11 5" Sch CH CNL Run 4 5" Shc CH DIL Run 10 5" Sch 5" GO 5" Sch Mobil Mobil E & P Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohio State of Alaska Trans. #171 Run 1 Run 2 · DISTRIBUTION D&M Dallas Drilling Ext. Exploration Exxon Getty Marathon ARCO Alaska, Inc Prudhoe Bay ~ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 19, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 9-1 Permit No. 75-76 DS 9-12 DS 9-2 Permit No. 76-16 DS 9-13 DS 9-3 Permit No. 76-35 DS 9-14 DS 9-4 Permit No. 76-40 DS 9-15 DS 9-5 Permit No. 76-47 DS 9-16 DS 9-6 Permit No. 76-48 DS 9-17 DS 9-7 Permit No. 76-58 DS 9-18 DS 9-8 Permit No~ 76-70 DS 9-19 DS 9-11 Permit No. 76-84 DS 9-20 Permit No. 77-7 Permit No. 77-8 Permit No. 77-25 Permit No. 77-36 Permit No. 77-37 Permit No. 77-38 Permit No. 77-39 Permit No. 77-40 Permit No. 77-41 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JCD/lmh Attachments cc: Sohio Petroleum File PI(DS as above)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlantlcRIchfieldCompany ..... - STATE OF ALASKA -- ALASK, _ .~. AND GAS CONSERVATION (. .,,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL :~3 OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-25 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20249 4. Location of Well ll12'N & 125'E of SW cr Sec. 1, T10N, R15E, UM 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E, UM 1297'S & 1225'E of NW cr Sec. 2, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 54' RKB ] ADL 28327 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 9-14 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to add perforations on DS 9-14 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10390-10420' MD 10436-10466' MD 10880-10915' MD Ref: BHCS 8/4/77 01% I?Ol/Y1 ~ '~ O. MAR 2 '"' ,~ i984 0it & (las C01is~ ~0mmissi0~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed · · _ -,. -,, . Title Regional Engineer The space below for Commission use Date Conditions of Approval, if any: Approved by Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate North ..... ~ka ~District Post C ? Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 20, 1981 Reference: ARCO Cased Hole Finals D.S.2-16 2/3/81 Collar Log D.S.3-5 3/10/81 CCL/Gyro D.S.5-16 3/11/81 CCL/Cyro ........... ~"D.S.9,.!4 :' 3/12/81 Perf & CCI, D.S.12-2 3/8/81 CCL/Gyro D.S.16-1 3/7/81 CCL/Gyro D.S.16-2 3/7/81 CCL/Gyro D.S.16-2 2/6/81 CCL P~le~se sign and return the attached copy as receipt of data. Run 2 .Run I 2"/5" :~:~.~.~.: :log. l.',u:~4 2"/5" ;:a~.,, log - 2"/5" :.;amc log t<~n 2 2"/5" .~amc log - 2"/5" same log - 2"/5" Mary F. Kellis North Engineering Transmittal #136 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO C)~I ,~lnd G,Js Company ts a Div,slon ol AliantlcR~ChlleldCompa~y EXXON MOB I L GETTY PHILLIPS,." ....~ ~, SOH i 0 r....(. -' z:--' '. ,,., ..' '" MARATI]ON CHEVRON ,,,~. ~ S:" 'C,;"?~. ,- .... ARCO Oil and G'"'~'ompany Post Office Box 3'30 Anehorace. Alaska ::)05!0 .. Te!e.onono 907 277 September 3, 1980 , WK= mo , r--~' 3';.S..:!~'~' , --t 3 ~'o~'1 --I S~A~ ~¢C'-1 ~1-' STAT TEC I CONFER: Reference : ARCO Cased Hole Logs D.S. 1-1i D.S. 1-17 D.S. 2-10 D.S. 6-13 D.S. 6-14 D.S. 6-14 D.S. 7-11 D.S. 7-12 D. S.? ~,,.7.:-14 D.S. 7/3/80 CNL Run 2 5" 7/3/80 " Run 2 5" 7/2/80 " Run 1 5" 6/7/80 " Run 1 5" 6/25/80 CNL Run-1 5" 6/25/80 CCL/Gyro Run 1 2 & 5" (same log) 6/30/80 CNL Run 3 5" 8/2/80 Caliper Run 1 5" 6/30/80 CNL Run 3 5" 8/6/80 Diff Temp Run 1 5" aud return the attached copy as receipt K. J. Sahlstrom North Engineering TRANSHITTAL #580 DISTRIBLrFION North Geology R & D Hobil Drilling Getty EcS. ,Manager Phil lips D & BI Sohio Ceology ~,Iarathon State of ~aska G~exmon ARCO Oil and OJ$ Cornp,:~ny Is '1 Dl¥1$~on Ol Ath~nNc ¢,~chi~cldCompar~y AtlanticR;cChfieldCompany North Arner:c~ Producing DivisiOn A:aska Re.,. · Post OUic-3 a .350 Anchorage, Alaska 93510 Yelephone 907 277 5637 October 24, 1978 - Reference: Enclosed are the following Pressure Buildup Analysis: o~ 5/29-30/78 5/27-29/78 Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering rp ~ ~RAa~S.'~ITTAL ¢523 North Alas~" ' "'~'rict Posl: Of[ice ._ .~50 Anchorage, Alaska 99510 ..,007 Telephone 907 277 October 16, 1978 Reference: Enclosed are the following Cased Hole Logs: · '~ Continuous Flow Survey n D. S-, #g-15 Continuous Flow Survey Please sign and return the copy as receipt of data. Sincerely, NorLh Engineering Transmitt&l #513 AttanticRichfieldCompany North American Producing Division North Alask-~'"strict Post Office 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS ~=~p Permit No. 77-8 Permit No 77-25 DS~'5 Permit No 77-36 DS 9-16 Permit No. 77-37 DS 9-17 Permit No. 77-38 DS 9-18 Permit No. 77-39 DS 9-19 Permit No. 77-40 DS 9-20 Permit No. 77-41 Dear Sir: Enclosed please find a Completion Report for the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer FMB: lr Attachments Form P - 7 SUBMIT IN D,~ ~,ICATE* STATE OF ALASKA s, Mructions OIL AND OAS ~ONSERVATION COMMITTEE i i i i ii ii WELL cOMpLETION OR RECO~PLETION ~EPORT AND LOG* la. TYPE OF WELL: oli,' ~ UASI~ WELL WELL ~ DRY Other b. TYPE OF COMPLE~ON: WELI, OVER EN ~ BACK RESVR. 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4. LOC~,TION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 1112'N & 125'E of SW cr Sec.1, T10N, R15E, UM At top prod. interval reported below 1608'S & 1533':E of NW cr Sec.2, TiON, Ri5E, UM At total depth 1297'S & 1225'E of Nh/ cr SEc. 2, T_10N, RJ_SE, UM 5.API NU~DI~ICAL CODI5 50-029-20249 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. iF INDIA3q, ALLOTTEE (.)It THI [3E NA2¥LE Other --Rerf-orateA .......... 8. UNIT,FAR2Vi OR LEASP; NAME Pr,,dhom Bay llnit 9, IV~L NO. DS 9-14 (11-2-10-15) ,0. ~ ~ ~oo~, o. w,~P~h0e ~rudhoe Bay_ Field-9il Pool 11. SEC., T., tL, M., (13OTTOM }10~ O~ EC~FIVE) Sec. 2. T10N.R15E UM 12. PEI~I'F 'Bro. ' " 77-25 13. DATES SPUDDED ..... 7-16-77 I~. TOTAL DEPTH, NLD & TVD~lP. PLUG, BA. CK IMD & TVD~0. IF ~ULTm~ CO~L., 21. HOW ~Y* ROTARY T001. M ll,OgO~; q199'TVB / 11_007'~: qlA2'T~B ~n~l~ All ~. P~ODUCING !~2HVAL(S), OF ~IS CO,MP~TIO~TO,P, BOSOM, NA~ (MD AND ~)- 8-4.~77 8-22-77 11-22-775 54' RWB .a INTERVAI,S D[{[I,I.ED BY Top Sadlerochit 10,382'MD, 8655'TVD Rm.qm RAdlmroe. hit 10_951 'MD QOQ7'TVB 24. T~'PE ELECT}HC AND OTHEi% LOGS R!JN '1 ---- CABI.E 23.WAS D!}{ECT1ONAL , .'4 U 1~ V EY MADE BTT./RI4C/GR; 25. CASI2~G SIZE 20" 13-3/8" g-~/8" ! N-RO ~ 11 .flAg' ....... I I, s- si ' ,' 26, LINE.X lq~EC O tlI) S!ZlD TOP (A,ID) I EOTTOA5 (MD) SACKS CE2'IEN~T* ~k. PERFORATIONS OPW.~N TO PRODUCTION '~ (interval, size and number) 10,850'-10,869' 10,816'-10,828' 10,808'-10,812' 10,740'-10,754' lO- 667'-1 O_ 707' FDC,/CNL/aR _ CNT. / GR/CAT., CaT., FnT. CAS-ING RECORD (Report all strings set in well) t\VEIGHT, LB/PT. ~ GRADE , DEP~ SET (~) HOLE SIZE Weid dl U-40 I 02', I72#-Butt 1~-80 I 2712: 17-]/i" [ a7#-m,ee 1 9-1/i" 'I CI:Z\~LNTI N C; H. ECOILD 267 sx Artic Set cmt 6800 sx Attic set cmt AMOUNT PULLED I 27. TUBING RECOiLD SCi~EEN !MD) SIZE DEPTI-I S]E'U (MD) ~ PA£'IiER SET $-~/2" 10,240' ~. 1~ . ~ ,I , 29. ACID, SHOT, FLOAT'[ Gf{~, C~df_NT SQULiYDL"ETC. DEPIIi INTF~VAL (MD) N!A .. · 30. Pig~)DUCTION DATE FLEET PIiODUCTION [ P~ODUCT1ON MEIHOD (FIowiDg, gas lift, pumping--size and type of pump, .[VJ;l:JLL?/i',Cfb'g'?0,[ih{t~4% o,' 2-h-78 t Flowin~ I Prbducine _2-2o-7a ....., FLO%V, TUBING [CASBNG PRESSURE [CALC~T~ OI~B~L. GAS--MCF. WATEa--BBL. IOIL GHAVITY-~I (CORR.) , 1100 I - I ~ 14818 [ 10057 I0 1, 27,0 ~,1, DISPOSITION OF OAS (80Id, ~8e8 ~Or ~e~, vented, etc.) ] TE~T WITNESSED BY ReSnSected t ProductSon 0peratSons 32. LIST OF ATTACHMENTS hereby certify that the foregoing and_attached information is complete and correct as determined from ail-available recurds / *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete ~nd correct well completion report end log on all types of lanJs ~nd leases in Alaska. . Item: 16: Indicate which elevation is used ~s reference (where not otherwise shown) for depth measure- ments given in clher sp~ces on this form and in any attachments. Items ~20, ~,nd 22:: If this well is completed for sep~ratc, production from more than one interval zone (multiple completion), so state in item 20, ~nd in item 22 show the p~cducir~g interval, or intervals, top(s), bottom(s) ~nd name (s) (if ~ny) for only the interval reported in item 30. Submit a separate report (pa0e) on this form, ~dequotely identified, for e~ch ~dditionol interval to be seper~tely produce, J, show- ing the ~ckJition~l data pertinent to such interval. Item26: "S~cks Cement": Attached supplemental records for this well should show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit ~ separate completion report on this form for e~ch interval to be sep,~r~tely produced. (See instruction for items 20 and 22 above). ' ,,34. SUMM'ARy OF FORMATION 'TEST:S INCLUI)iN(; 'IN~ERVA~. TESTED, PRESSURE DATA A_N-D~"0VERIES OF OII~i GAS. ' 35. GEOLOGIC M AHKEI{S WATER AND MUD _ , M£AS. Om"T~ ~Lr~ V~:RT. DgPqa; _ 36. CORE DATA. A'I'FACll I~RIE~' DI/gSCI~PI~f'IONS OF LITIIOLOGY. POROSITY, FRAC~R~. APP~ ~ AND I)~rgCq'gl) SIIOWS O~ OIL, G~ OR WAT~. AtlanticRichfieldCompany North Ameri' Producing Division North Alask. ~strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 10, 1978 Reference: -. Enclosed are the Pressure Buildup Surveys for the following wells: ~ ~127/78 9-15 5/30/78 9~7 6/26/78 Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL #404 MILE 4. NORTH RD. BOX 3453 KENAI. ALASKA 996JI PH. 1907) 283-4403 ANCHORAGE. ALASKA ,TELEPHONE I g'O'/J TLX ODO~"64BI Company ATLANTIC RICHFIELD COMPANY Well ~ ] 4 Location.. NORTH SLOPE Pressure 1000 2000 Field Formation 30O0 Location DRILL SITE #9 PRUDHOE BAY SADLEROCHIT 4000 TEMP F° State ALASKA .Date 18 NOVEMBER 1977 40584 40585 M.D. S.S. PRESS.PRESS.GRADIENT 100 -46 1176 1179 2054 -2000 1767 1769' .288 4198 -4000 2399 2405 .318 5581 -5000 2755 2757 .352 6963 -6000 3105 3109 .352 10638 -8800 406-3 4065 .341 0 1187 1192 Well InfOrmation Elev. - 54 Datum -8800__ Zero Pt. Csg.__ to__, ~to Tbg ....... to __ __ to Perfs. Pkr. PBTD ~ Csg Press Oil Level H20 Level Well status Prod rate Date last test Status of well last test P'rod. rate )ast test Press. last test Press. this test Press. change Element Nos. 40584 Calib. No. . Remari(s BHT = 188° 40585 Alaska Post Office ~ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 i '. January 13,1978 Reference: Dear Gentleman: The ~llowing material is being submitted he,with. Please acknowledge receipt by signing a copy of this letter and returning it to this office. D.S. 9-1 D.S. 9,2 D.S. 9-3 D.S. 9 5 D.S. 9-6 D.S. 9-7 D.S. 9-8 D.S. 9-9 D.S. 9-11 D.S. 9-12 Initial Transient Pressure Survey Nov. 14/77 Nov.27/77 Nov.24/77 Nov.21/77 Nov.18/77 Dec.18/77 Dac.6/77 Dsc. 10/77 Dec.17/77 Dec.21/77 Initial Static Gradient Pressure Survey D.S. 9-13 Nov. 20/77 ~D.S. 9-14~ Nov.18/77 D.S. 9-16 Nov. 21/77 ~~'~, V e~~ry ITruly Yours~ ~ ~-~--~ Donovan Jackson ~/ \ ' Nor_th Alaska DistE;~ Engineering North Alaska District ~]gineering T RAN'S M I T TA L To' Date- /-/1 - '7 ? From: Well Name' J. A. Rochon/ R. A. 1,0~_.e_ p. ',,9- Iq Tra~].smitted here~ith are the following for' the subject well" F I~)~PL · · · Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement_ Bond Log/VDt Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core' No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - ~/ro Single Shot Multishot Drill Stem Test - Test No. [k~al Induction Laterolog Formatibn Density Log Formation Density Log/Gamma Ray. Ganm~a Ray/CCL Laterolog Location Plat Microlaterolog Microlog Mudlog- Interw.1 Sample Log (A.R. C6.) - Interval Synergetic Log TVD-DIL TVD-Porosity Log Receipt Acknowledged For: Date: Please return receipt to: Attn' Mr. Donovan Jackson Atlantic Richfield Company North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 AtlanticRichfieldCompany North AmerJ.,~.an Producing Division North Ala'. ;istrict Post Office uox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 28, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 5-8 (22-6-10-15) Permit No. 77-24 DS 5-11 (12-31-11-15)Permit No. 77-30 31-30-11-15)Permit No. 77-43 11-2-10-15) Permit No. 77-25 S 9-15 (11-1-10-15) Permit No. 77-36 DS 9-16 (33-3-10-15) Permit No. 77-37 Dear Sir: Enclosed please find a Sundry Notice outlining our changes for the above-mentioned wells. Very truly yours, Frank M. Brown Di~strict Drilling Engineer FMB/mln Enclosures · RECEIVED [.1,:: t, o ,.t Form 10-403 REV. 1-10~73 Submit **Intentions" in Triplicate & '*Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OIL ~ GAS D WELLi~ i WELL OTHER 2. NAME OF OPERATOR ATLANTIC RICHFIELD COMPANY 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 1112' N & 125' E of SW cr Sec 1, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14, Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20249 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 9-14 (11-2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe Oil Pool 11. SEC., T., R., M., {BOTTOM HOLE OBJECTIVE) Sec 2, T10N, R15E, UM 12. PERMIT NO. 77-25 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF L---.! PULL OR ALTER CASING FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Correct Perforated Intervals SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Began perf operations 11/17/77. Tstd tree, csg & wireline BOP's. Pulled dummy valve. Perf'd intervals 10,850' - 10,869', 10,816' - 10,828', 10,808' - 10,812', 10,740' - 10,754', 10,707' - 10,727', 10,687' - 10,707', 10,667' - 10,687' w/4 shots per ft. All perf'd depths referenced to BHCS/GR open hole log of 8/4/77. Ran Amerada press bombs & FDL. Flowed well. Ran & set ball valve. Tstd balance & control lines to 5000 psi, ok. Bled press above ball valve to 0 psi, held ok. Installed & tstd tree cap to 5000 psi, ok. Released well to Production Dept. 11/22/77. This report replaces the one previously sent on 12/13/77. 16. I hereby ce~ that the foregoing ~ue and correct (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side AttanticRichfieldCompan¥ North Arnerl ~ Producing Division North Aiask ~lrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 ;~77 5637 December 13, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subj ec t: DS 9-13 (13-7-10-16) Permit No. 77-8 ~ ~ s~~ ~-~- ~ o- ~ ) Permit No. 77-25 DS 9-15 (11-1-10-15) Permit No. 77-36 DS 9-16 (33-3-10-15) Permit No. 77-37 Dear Sir: Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /am Enclosures Form,10-403 REV. 1-10~73 Submit '*Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---~' for such proposals.) WELL L--J OTHER ~ NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360; Anchorage, Alaska 99510 4. LOCATION OF WELL At surface ll12'N & 125'E of SW cr Sec. 1, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20249 LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. D.S. 9-14 (11-2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2, T10N, R15E, [~ 12. PERMIT NO. 77-25 ~ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) SUBSEQUENT REPORT OF: MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING ABANDON* SHOOTING OR ACIDIZING ABANDONMENT* CHANGE PLANS (Other) Perforate (NOTEs Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. Began perf operatiOns 11/17/77. Tstd tree, csg and wireline BOP's. Pulled dummy valve. Perf'd intervals 10,850'-10,869', 10,816'-10,828', 10,808'-10,812', 10,740'- 10,754', 10,689'-10,709', 10,66-9'-10,689' w/4 shots per ft. Ran Amerada press bombs and FDL. Flowed well. Ran and set ball valve. Tstd balance and control lines to 5000 psi OK. Bled press above ball valve to 0 psi, held OK. Installed and tstd tree cap to 5000 psi OK. Released well to Production Dept 11/22/77. 16. I hereby certify that the foregoing is true and correct ~.. SIGNED ~ / ' // /~i~ ':Y~'~'~/~'~L Dist. Drlg. Engineer 12/13/77 TITLE DATE (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side Division of Oil and C~s Conservation O. K. Gi~~, Jr. D~ I~I~ H. ~1~ /~~ ~ef ~~e~ ~~~' ~ Dec~uber 6, 1977 Surface Safety Valve (SSV) and Subsurface Safety Valve~ (SSSV) Tests on arco' s DS 9-13,. 9-14~ 9-15, 9-16 Well 9-15 9-16 ~y, ~vember 21, 1977 - I departed my bcme at 7:30 ~4 for an 8:00 AM showup and 9:00 am departure via BP charter for Deadhorse. I~avy fog at Anchorage International delayed our departure until 9:45 AM and we arrived in Deadhorse at 11:15 AM. I ~ into BP opera~ and initiated ' testing of BP SSSV's in early aftexno~n. Kirk White, Arco drilling foreman, called that night and advised SSV's and SSSV's in four w~lls would be ready for testing the follc~ing evening. Arr~ts w~re made for me to witness those tests. Tue~, N~ 22, 1977 - During th~ day SSSV's in seven B.P wells w~re ~s~-f~iy-~ested, the subject of a separate report. At 7.00 PM I was picked up at BP operations by P~n Davis, Arco drilling fore~an, and we proceeded to drill site #9 w~_re testing began at 8:00 PM and was cc~pleted at 12:15 AM the following mo~dng. Besults are indicated below: Test Test Test 9 5/8" Tubing SSV SSSV Time Annulas _ _PSI @Jps!) __P~sua! ~ts @ (PSI) Results J_Hr~_,) PSI 1375 0 C~ 800 C~( 1/2 0 11-22-77 1500 0 :. OK 1000 CK 1 0 11-22-77 1350 0 OK 825 CX( 1/2 0 11-22-77 1350 0 ~ CE( 800 OK 1/2 0 11-22-77 Wednesday, November 23,_. 1977 - I ret~ to BP ~ations at 1:00 ~ and testing on "F" pad re~ at 8:00 AM, the subject of a separate report. I deparbed Deadhorse at 6:25 I~.{ via BP charter, arriving, in Anchorage at 7:45 PM and at my ~ at 8:15 PM. 'In ~: I witnessed successful SSV and SSSV tests c~ Arco's DS 9-13, '~;'I4',- 9-15, and 9-16. Drlg. ,Permit No.~__ Opera tor Alas~ ~il and Gas Conservation CommittF Field Inspection Report .~:~,~,~.,..~..,, Wel 1 / P]ia.tfm Sec T R M Represented by_]'f.]).?~?/'"<' Name & Number_ Satisfactory Type Inspection Yes No Item ( ) Location,General ( ) ( ) '--T~-. Well Sign ( ) ( ) 2. General Housekeeping ( ) ( ) ~. Reserve Pit-( )open( )filled () (), (~,) ..... ( ) ( ~,,,)~'~ ( ) () () () () () () () () Satisfactory Type Inspection Yes No. Item ( ) BOPE Tests ( ) ( ) 15. "C--~sin.q set 4. Rig ( ,,),'"S a f,e t_$j~_ V a 1 ve Tests 5. ~-TF~-E6~-No. -~ 6. Subsurface-No. Wells ( ) Well Test Data 7. Wel 1 Nos.~,_~,_____,_____- 8. Hrs. obser _,~, _,~ 9. BS&W , , __,~ lO. Gr. Bbls. , , , ( ) Fina~--~-~-aHdonment l l. P&A Marker ( ) 12. Water well-( )cappec~( )plugged ( () () () () () () () () () (1 () () () () () () () () () 16. Tes~L fluid-( )wtr.--~l )mud ( ) oil 17. Master Hyd. Control Sys.- ~sig 18. N2 btls.~ ,__, __, -~sig 19. Remote Controls 20. Drillinm spool- "outlets 21. Kill Line-( ) Che--~-~-~valve 22. Choke Flowline ( ) HCR valve 23, Choke P. anifold No. valvs flgs 24. Chokes-( )Remote( )Pos.(-~-~dj.- 25. Test Plum-( )Wellhd( )csg( )none 26. Annular Preventer,_~__~psim 27. Blind Rams, psim 28. Pipe Rams .~siq 29. Kelly & Kelley-cock _psig () () () () ( ) ( ) 13. Clean-up ( ) ( ) 30. Lower Kelly valve --~si, (.) ( ) 14. Pad leveled ( ) ( ) 31 Safety Floor valves-'L~- --)BV { )Dart Total inspection obserVation time,,~I~<.~_~=_hrs/days Total number leaks and/or ~,muiP. failures~ Remarks ~, ', , ' ~:;", ....... ,:---:"~,, '::" '<,- - '~, "~,', ', , ~ ,:.,~, ,,~.~ ...... ~ ~'~, :~ ;;~: ~.' ,,,~2~~' , cc',,'*, , ,~,, .;. N~tify in days or when rea y North Alaska District Engineering TRANSMITTAL To' From: J. A. Rochon/D. R. Jackson Date: November 14, 1917. Well Name' Transmitted herewith are the following for the subject well: Run No. Scale Xerox 1 BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma-Ray Log 5 BHC Sonic/Gamma Ray Log Caliper/CCL ..... Cement Bond Log/VDL Compensated Formation Density Log 5" Compensated Neutron-Formation Density '5" Compensated Neutron Log .... 5" Core Analysis - Interval Core No. Core Description (~qC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot b~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Formation Density Log Formation Density Log/Gamma Ray Gamma Ray/CCL Laterolog ~Location Plat ~crolaterolog Microlog _____ Mudlog - Interval Sample Log (A.R.C6.) - Interval Synergetic Log TVD-'DIL TVD-Porosity Log Sepia BL Line ! ea _._ I _ca _. __ t .-,.. ! ea Receipt Acknowledged For' Date' Attn' ~ Dono%m~ Jaci~son Please return receipt to" Atlantic Richfield Company North Alaska Engineering P. O. Box 360 .' .... Anchorage, Alaska 99510 #625 Atlant~cRichfieldCompany North Amc n Producing Division Norlh Alas, ~Jistrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 October 13, 1977 Mr. Hoyle Hamilton State of A1 aska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Ak 99501 Subject: D~~.13-7-10-16) Permit No. 77-8 ~_~DS 9~!4~1-2-10-15) Permit No 77-25 DS 9-15 (11-1-10-15) Permit No. 77-36 DS 9-16 (xx-3-10-15) Permit No. 77-37 Dear Si r' Enclosed please fi nd Sundry Notices outlining our plans for the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb' Enclosures Form 10-403 REV. 1-10-73 Submit *'i ntentlons" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTSON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OIL r'~ GAS WELLI ^J WELL L-J OTHER 2. NAME OF OPERATOR Atlantic Richfield Company ~ 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchoraqe, AK 99510 4. LOCATION OF WELL At surface ll12'N & 125'E of SW cr Sec. l, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20249 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 9-14 (11-2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe 0il Pool 11. SEC., l., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2, T10N, R15E, UM 12. PERMIT NO. 77-25 )crt, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT 5HOOT OR ACIDIZE REPAIR WELL PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS (Other) Perforate SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAI RING WELL FRACTURE TREATMENT~ ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state ali pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The downhole safety valve will be installed and tested upon conclusion of job. Estimated Start Date- 11/3/77 16. I hereby certify that the foregoing is true and correct SIGNED ~ ~ TITLE Dist. Drilling Engineer DATE (This space for State office use) C)F/~PPROVAL, IF ANY: CONDITIONS See Instructions On Reverse Side ~.'eturned 'Atlanti(~RichfieldCompany North Ame -n Producing Division North Alas~ istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 September 14, 1977 Mr. Hoyle Hamilton State of A1 aska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9-14 (11-2-10-15) Permit No. 77-25 Dear sir: Enclosed please find A Completion Report along with the Drilling History and Multi-Shot Directional Survey for the above mentioned wells. Very truly yours, District Drilling Engineer FMB/am Enclosure SUBMIT Ilq r ' .rE, '---~- STATE OF ALASKA OIL AND GAS CONSEaVATION COMMITTEE k JI I Il IIIJ 1'. I Il II~ I I I1.11 II I WELL COMPLETION: OR RECOMPLETION REPORT AND LOG* . ...... , _:.. ........, · ~Pg'OF: w~: o-.~ ~xs '~ ....... WELl. WELL ~ DRY~ Other TYPE OF COMPLE~ON: WEI.I.I ~ OVER ~ EN ~ BACK DIFF, [] r. ES%'R. Other 2. NA},I}: OF OF£RATOI~ Atlantic Richfield Company ADDRESS OF OPERATO~ P.O. Box 360, Anchorage, Alaska 99510. 4. LOCATION OF WELL (Report location clea,'[y and.in accordance with ami/ State requirements)* At surface ll12'N & 125'E of SW cr Sec'. 1, T10N, R15E, UM' At top prod. interval reported below 1608'S & 1533'E of NW cr Sec. 2, T10N, R15E, UM At total depth 1297'S & 1225'E of NW or Sec. 2, T10N, R15E, OM ~i('. D-~TE SPUD DD' i14. D,,TE T:D. t~-~f2HF_AD [ 15. DATIg COS'IP SUSP OR ABA~Nq), .... 7/16/77 I 8/4/77 a/29 /.77 5. APl NUM.EALICAL CODE 50-029-20249 6, LEASE DESIGNA"I'ION A2qD SERb[L NO. ADL 28327 7. IF INDIAN, ~LO'L'FEE Olt TRIBE NAIN~ :i. TOTAL DEPTH, ~LD & 'TVI~9. PLUG, I~.&..CK ' 1~I1~¢& w~UVDp. ~ ~LTmLa CON~L., 21. ' ' 11,080 ' b~, 9199. ' ~ 11,007' ~, 9142' ~} ~xngze~°w ~Y- ~0~,aYAll~O0~s ~ P~oDUCiNO IN~RVAL(S,. OF ~IIS C03IP~TION--TOV, BOSOM, ~'AAIE (MD AND ~1' Top Sadlerochit 10,382 ' MD, 8655 ' T~ Base Sadlerochit 10,951'~, 9097'T~ 2;. T%-I~E ELECTiHC AND OTI{~ LOGS RUN 8. UNIT,FA. IkXi OR L'~MLE NAME Prudhoe, Bay unit '9. %VELL DS 9-14.(11-2-10-15) .... ~ruanoe Day Sec. 2, T10N, R15E, UM 12. PE'R-2,I£T NO. 77-25 t16. F-J~EVAT'ION5 ~-DP, }¢~,kl;. 1CF, GR, ETC)~ i17. EI.~V. CA$1NGtiEAD 54' ~ INTERVALS 1)RII, L~'-D BY f ('ABLE TO0 I..~ 23.~VAS DIRECTIONAL , SU[IVEY MADE I Yes DIL/BHC/GR, FDC/CNL/GR, CNL/GR/CCL, CCL i ~. c ._ ~__tl__ I I . ii,IL I ,il.ii I I -- : : - i i. cASING RECORD (Report ali strings set i:; welt) 'I CASI24G SIZE WEIGHT. LB .FT. ' 20" 96~ Welded 13-3/8" [72# Butt 9-5/8':i~ [ 47# Butt !' LINER Iq'ECYC P, A3' H-40 t 102' I 32" :N¢a0&i:-Zl,043,''i1 12'124"i , S_gS 1. '__ il 1' ..[_' . SIZE TOP (.',iD) EOTTOEI (.lID) SACI(S CEMENT* 28~iR~'0RX~'tON~ O~ TO P~d~UC~O~ "' (interval, size and number) CE:,,ILN'i'ING RECOtHD I A.?.[OUNT PULLED 267 sx Artic Set cmt.. [ 6800 sx Artic set, cmt 1000 SX C/[ass _.G_ cmt · . ~ NA ·" ! 27. SCYkE_-~N ( 55D ) S1ZE ' 5-1/2" -- -- .: --~ ',~ ' I . Ill I I' I I - _ 3e. P 1~O D UCTI ON DA.'L-E FiRE'F PfL[)DUCTIO.N' I PI%ODUCTION MEI[[OD (Fiog:i~'g, !:a,;, lif~, pan;pb~:g--size and type of pump TUBING RELO ILL) 10,235' .... 10:110' ..... 29 ACID, ShCT. F;iAZ'[ C[~'-;'. C~,ILN'F SQL'LEZ2:i' E'rC DF-ff~I'[~ INq'~VAL (5ID) I :X~,~'.oUN.r'A~D.I./!ND, Ol('klA'iES~Ah US~ N/A ..... _[ ........... : : '" "'~ ........ 'Ar;~ ?%,iiV r:LL :,.~ ;x t'b's, ~,:-~,d',,,:,~. Ib.ltl~-in; ~/A ) . . DATE OF T~$T. I [(2URS FLO;V -TUBING - AS[NG' PRESSURE [CAI.~TD OII~BBL. . 31. DISPOU-IT1ON OF GAS [.~O[d, u~ed for loci, vented, etc.) 32. 1,18T OF ATTACHMENTS G AS-?.,ICP. I V,'A'I'ER~II[ll.,, I CiAS-OIL I[.ZTiO ]%V..VVE~I;BL. ] OIL GI:AViTY-A_PL II'EST 'A'ITNE[;.'gLD BY Drillinq..history, Multishot Directional survey.. 5;[~. I hervby certif'y tha'~',~he foregoiug and at. tached information Ia comDle~e a~d correct as detprmi;;rd [~,.m [tlI-';~v[tilable rvcor(Is '~.~/ ~~.~ox Dit ~;~(//~ 'Y~ / ' TITLE 'S rict Drilling Engineer Dx'ri' ~ / r . -__ ,-:-: :::::--:.::: ........ ,-: ......... :_ .... f</(--?: .... *(S~e l.~.~tio,~ ~.~ Sp~ ~o~ Additio.~l D~ o. Reve~e Side) ] . INSTRUCTION5 all types o{ I,'~n:ls an(I lupuses i~ Al~ska, Item: 16: Indic,~le wt~cl~ elevatio~ is used as ~elc, re~(:e (whe~c, r~ol c)tlmrwise shov~rfl lo~ deptt~ n~easurc'. menls given in tiber sp4ces on ll~is for'~ and in a~y i~t'iac ~e~ts. Items 20, and 22:: If lifts well is compleled for separate, production from more than one interval zone (multiple completion), so state in item 20, and in item 22 show the prc. Jucing interval, or intervals, top(s), bottom(s) and name (s) (if any) for only' the interval reported in item 30. Submit a separate report (page) on this form, 'adequately identified, for each additional interval to be seperately produce~t, show- ing the a~itional data pertinent to. such interval. Item26: "Sacks Cement": Attached supplemental records for this well should show the details of. any mul- tiple stage cementing an~ the location of the cementing tool. Item 28: Submit a separate completion re~rt on this form for each interval to be separately produc~. (~e instruction for items 20 and 22 above). ..... 3,t. SUM~AI~.~ OI,TM I,'OiLN'f^TION 'I',~'I:S iIN('LUI'~'I'N(i'INq'~':ltVAI~ TI~"'I"~D. i'~i~II'E.~LSt~¥IE DATA.' A.N~'~CZO'VEI[IF,,..~ 0~"'OiLi CJASl ............... WATER AND MUD .. . · ~6. ('.OHE DATA, A'I'I~ACI[ IIRIEF 'OESC:IUP.JTIONS OF LITItoLOGy, PORO'~ITY. FRACTUI1F. S. AImPAJ~.E. NT' DIPS AND I)E'I'EC",I'EI) -~IIOWS Ol~ O11., G~S Oil WATEII. ,, ., . ,, DRILLING HISTORY OS 9-14 (11-2-10-15) API 50-029-20249, ADL 28327, Permit No. 77-25 Spud @ 1530 hrs 7/16/77. Drld 17½" hole to 2750'. RU & ran 13-3/8" csg w/shoe @ 2712', FC @ 2633'. Cmtd w/6800 sx Arcticset cmt. Did top job w/150 sx Arcticset cmt. NU & tstd BOP. Drld out shoe & 10' new form. Tstd form to 12.5ppg equiv. Directionally drilled 12¼" hole to 11,080'. Ran DIL/BHC/GR & FDC/CNL/GR. Circ & cond hole. RU & ran 272 jts 9-5/8" csg w/shoe @ 11,049', FC @ 11,007', upper FO @ 2397', lower FO @ 2526' Cmtd w/lO00 sx Class G cmt, slurry wt 15.8 ppg. Set & tstd 9-5/8" pkoff to 5~00 psi OK. Opened lower FO, pumped 200 bbls wtr, followed w/20 bbls caustic wtr. Pumped 30'0 sx Arcticset cmt. Closed FO. Opened upper FO, pumped 400 bbls wtr. Did Arctic pack job. Closed FO. Displ mud w/fresh wtr, fresh wtr w/10.6 CaCle. Ran CNL/GR/C~£L. Ran gauge ring junk bskt. RU &_.ran__~½" compl as~b_]~_.w~/shea~ sub @ 10,235_, 4½" XN nipple @ 10,176', SAB pkr @ 10,110','PBR @ 10,099', 5½" XN nipple @ 10,060', XA sliding sleeve @ 9987'. RQY nipple @ 2214'. Tstd balance & control "lines & pkoff to 5000 psi OK. Displ tbg w/diesel. Set pkr. NU & tstd xmas tree to 5000 psi OK. Pulled dummy valve. Ran CCL/gauge run. Reran dummy valve. Press tbg & annul for long term tbg tst. Released rig @ 0100 hrS 8/10/77. Discovered leak, skidded rig back to DS 9-14 8/13/77. Displ diesel in tbg w/lO 6 CaCI^ wtr. Installed BPV, ND tree, NU & tstd BOP OK. Pulled & LD 5½'" tbg, f~und break in sliding sleeve body. RIH w/8-1/8" x 6" overshot bumper sub. Engaged fish @ 10,065', pulled 50,000# over string wt. Set back down to 5000 over. Rotate to right to release K anchor. POH w/no rec. Check, redress overshot. RIH & engage fish. Attempt to release "K" anchor. Grapple pulling off. No. rec. Redressing overshot & 5- 3/4" grapple. TIH w/5-3/4" overshot, unable to get over fish. Tripped out, chgd out fishing toOls. RIH w/overshot dressed w/5-7/8" grapple. Engaged fish @ 10,065'. Released "K" anchor, POH, LD fish & fishing tools. Make up RIH w/"K" anchor on DP. Attempted tst, had communication from anul to drl pipe. Drl pipe to anul tstd OK. Released "K" anchor' POH, sea'ls undamaged. Tripped in w/reconditioned "K" anchor. Circ'above Packer when leak was detected on stem of TIW valve on Kelly' Replaced same. Press tstd anul & drl pipe, stabbed into Packer all OK. RIH w/5½" tbg string. Latched into Baker "K" anchor @ 10,110'. Sheared out of Baker SBR, 70,000# over string wt. Spaced out tbg string. Displ tbg w/diesel. Landed back into PBR. Tstd tbg to 3600 psi w/anul open for 1 hour OK. Tstd anul w/2500 psi w/200 psi on tbg for I hour OK. Installed tree & pkoff tstd 5000 psi OK. Pulled dummy valve & ran CCL dummy gun tool from PBTD to 300~ above Packer. Ran 5 hour tbg tst indicating tbg anul OK. Retrieved dummy valve, & set tst pl.ug in tbg hgr. ND tree, NU BOP. Tstd to 3500 psi OK. Retrieved plug. Reversed out diesel. Circ hole clean w/water. RU & reverse w/diesel. Installed back press valve. ND BOP, & NU & tstd tree, OK. Ran CCL dummy gun to PBTD. Reran Otis dummy' ball valve, tstd lines to 5000 psi OK. RU & press tbg & anul for long term tbg tst. Released rig @ 0800 hrs 8/22/77. ~I l Eastm~n ~ ~,, , , Whipstock l )~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC T,~OtV.4 L SURVEY ATLANTIC RICHFIELD COMPANY COMPANY WELL 9--14- WELL NAME PRUDHOE BAY LOCATI ON JOB NUMBER AS77 S059 TYPE OF SURVEY ~LTI-SHOT DATE 8-..5-77 SURVEY BY ED BUTLER OFFICE ALASKA ~OM P L E ~'T L:-A'N T'I'C~R~'I CH qAGNETIC .... MUCTI-SMOT .... S~RVEY DEC~'INATION'-~I ..... DEGRE~'"EAST qAD'I US' 'OF'"'CURVATURE--METHOD'~'OF' COHPUT'ATI'ON COMP UT E' D~FO'R ................................... A'~--"C-A~CU~A~TIONS'PERFORMED BY ....................................................... T R U MEAS-, .... DR'-IFT"-'VERT'ICA~ ............ $WB ........... DR I FT ............. TOTAl--COORDINATE5 C-"'~--O--~-~-'R--E-5 '~E'VER-I~Y ' SECT D'EPT H--A D I202 ..... 0 Z5 "l~01,'gg I~?,'9g" S~8,00W .............. Z~'I S i'2~-W ..................... 2'*'6Z ..... S-a8 ........ 0 ......... 0-~'~'~ ...... 0'~"02I ............................. ~-0 --2680---0--~ -Z~ 55 ...... -2-8 55 ..... 2--30 ~g'~-8~---'O -~'1-~'~-"1'5 ..... 0 ........ ~2~1"8 -332-1' ~1-4--21--45 ..... 3395'~'1-a ....... 3B~41'"14 N69.'OOW .......... 3'4"*45 N .......... 121'22 W .......... 1-26-'0-2-N'-7~- ....B ...... 5'-W" 2-'~"~'2 i1'9~'~'~ ~'50'7-2 ~--15-~ 4'8-I-~-05--~ 4-2 ~"600-26 ...... 0 .... ~565-. 59 .... ~5'1 I'-59 N69.00W ........ 61-,09--N ........ 190 · 62- W ........200',I7-N-'72 ..... 13 .... 4'8'-W 2~'-9-'57 I9: ~ 6'9 3 ~8~~-0~'7~-.'0 5~36 7'5-,"05 N --3-880 ~973-36 --~-06 6--3 9--~-5~'955-.-2-1'-3'90 -~-253 .... ............................................................................ RECORD '"OF-'--SURVEY ..................................... AL:L--CALCUL'AT'ION$'-"PERFORMED-'BY .... i ..... B-M'-'ELECTRONIC-'CO[qPUTER ........ : FRUE ' ................................................ D'O'G--L-E~ VlE'A-S', 'DRIFT'-'-VERT-['CA~ ........... SUB .... DR I FT ................... TOT-A'C--C'OORD-~NATE'5 .............. C--L'-'-"O""-~ -'U~' R "E -S .............. S'EVER'~-~ SECTI ON DEPT H-"ANG LE ......... DE'PT H .................... SEA': .... D 1 R E C ............................................................ DIST ANC E .................. AN G L-E ................ D'EGT'[-O'O Fl" --'GIST-AN CE D ..... M .................................................... DEG, D .... ~ ..... S -~'998 .....43 15 ...... ~629'17 ......... 4575'1~ 'N59,SQW ........... ~6'~,26 N ......... 991'40 W .............1094,72' N"~'4 .... 54 24 W ..................... 0,594' ................... 1080,29 " -5T8~3 ...... 0 ....... ~7'6 ~",-'~ 0 ......... ~'71'1 ~ 8'0 .....N 59 · 00 W ........52 9",'30'-'N ......... I"l' O'l-~'27~~I-2-~'-~'"87--N-6'4-~"9--~6--W 0 · 3 ~ ~ i ~ 07 · 69 -5278'-~'3 .......... 0 ......... ~833,~1 ...... ~9'~8~ N~9,00W ............. 561-;9~ N Zi55",64'"'--W ........... ~'2e5,0~ ~'"--64 ..... ~ ........... ~ ...... W ....... ~-~-6-~"6- ........ ~2'~i",00 --5-4-6'4--4"3--45---'4'96'9'.'43 ........... 491'5'*'"~4"3 ....... N58*'OO'W ........ 6'2"8'",-0'1 ..... N ...... 1r'2'~4'''"'4'6 .... W--~--4]''~"'I"--8~'--N''"'6'~--'--~''~--~''~ W 0.956 1398.10 -55'57-43 ...... 45 .... 5036,'61 ...... ~9'82,'61 ..... NS~,OOW ........ 662,56'"N' ' 1318,~0 ....... W ......~'~%75',-~9 ..... N-"63 ..... 19 ..... 2-~-'W 0,7~ 1~6-2'~"3-8 5-'651-'"'4'4 ....... 0 ....5104.37 ..... 5050*37 .... N56,50W ......... 698~'28"N ~373"1'8 W 1'5'4'0"-'55 ..... N-63 ........ 2 ..... ~5--W 0,370 152~'~"5i- -57'~'4'-'4'3--4"5 ..... 5~71","4'1 ...... 5117'-,'4"1 ......... N58,50W ....... 7'3-'2"*"9'1' .... N ..... I'4'27'"'5"4' W-- 1"6'0'~";"6'9 ...... N-6'2'-'Ag-2'4' W 1 .~3 1591,93 ..... 5-837""~5 .... 15 .....5237.74" '51'83,74 N59,00W ....... 766',73 N !~83,27 W ..... i669,72 N 62 39 ~2 '~; 1,o30 1657,02 . 5930 43 0 530~,'~9 5250,'~'9 N59,00W ......... 8-00.0'/ N i538,76 W 173.~..,...3.3_._N_62 31._4..0 W 2,~19 172_~_65 --~-6~-3 ~2--~-5 5372-,'"6'~ ......... 5'3i8"','6~ ..... N59,00:W ...... 8"3'2"~,-6'6--N .......... 1-5'9'~-','00 W--1797,50 N 62 2~ 13 W 0,269 ~'i'17'--~2 .... 3-0 ....... 5'~'1.81 .... 5387.8i N58.50W ....... 8-65,69 .... N ....16~7.''~2 ..... W- ' -~8'6'-1'-.'0~ ..... N'-"62 .... i6 .... 4~-'"W 0,360 18~8,37 --6~'1-0 4-2--3-0 .........55'1'0,38 ..... 5A56-,'38 .... N58,OOW ...... 8-9'8,75'-N ~700,85"-'V~ ...... --[-9-~-'~-'*~i' ...... N'~'62 8-'-50-W 0,36~ 19il.ia 6303 42 ~'5 ~578',"8'I ........ 5~2'4;-s'"i .... N58','00;~ ..... 9'3-2~-i-2-'~ f-7~aV2-6 w--19~6"~-5'3---N-62 0 ~6 W 0,269 197~,n~ 6_3_9~___~2 ....30._ _56~7_.,.97 ...... 5_593,97 N57.00W .......... 966,32 .... N __1807,95 .... W__ 2_0..~9,_99 ....N 61_ 92_33 ..... %~ .......0,.5_5.~_ 2037 6583 ~ 0 5783,43 5729.43 N55.50W 1036.91 ~% 19i4.06 W 2~76.88 N 6i .33. 14._w ..... 0,9__~?~ 2_~_5._1_! 6675 ~ ~5 5899.9~ 5795,9~ NS~,50W i07~.2~ N 1967.3~ W 22~.5~ N 61 2~ 5i W 0,967 2230.[5 ........... ~-76-9--4-5 ..... 0 ..... 5'9-1'5"8-I- -'586'-1'.'81' N5~,50W .... 1~12'-32 -X 202'0.76--W -23'0-6.67 N 61 ~0 10 W 0.269 2295.75 --g-~"~2--g~g-5 5-9-8-~72 5-927',-~2 N5&,50W I150,~2 N 207a.18 W 2371.85 N 60 59 7 W 0,2~9 6955 4~ 15 50&~,05 5994,05 N53,00W 1188,97 F~ 2126,74 W 2~6,53 N bO 47 32 W 0,952 2~26,51 _7~_~.?.._4.~.._.9 ..6..ii.5_,.52 ....606..1,52 ...... ~N53_,50W 122.8.~12_N .... 2!_77_,..i_8 W__2%~0..i_,_~2~N_6_O'35 ~ W 0,370 .2.~9~,90 71~2 ~3 ~5 6182.56 ~128,56 N53,50W 1266,45 ,X 2231 00 W 2565.40 N 60 25 & W 0,269 _Z_5.5_6_,_3 ~_2.3_5__33 ~0___ 6_2~9..,.~.8 ........ 6!.95_..88 ..... N53.00W ...... 13_0~.85 ..... N ....... 22_82...al. W %6_27._. 0. 7 .... N _6.0~4__35 W 0.370~26.Z.~,~2 . ~_2_8_e.3___0_~.3.12~.~2_6.2.6.3..,.~2 ..... N~.3,..OO~_.l.3.~.,_Z.~_.N.__2_33_3_~3_O W 2~..2~_~0 N 60 ~ ZO W 0,5.3_8 ~_2.~ ~2_._.4_~_ ...... .~_~_8~_,18 .... 6~31_,.78 .... N53,50W .... I~8.i,06 N 2384,00 .... W_ ~_755.,.14__.N__.59 5~ .... 57...~ ........ _0,3_66 27~7,30 .......................................................... R E C 0 R.D....Q.E...S U.RV E_Y __A. LL_CALCULAI~LO~S_.P.E R E 0 R,~.ED_.BY_ I ...... B_FL_E LF_C~RQNLC_CO~P_UIER_ · .............. -%- ~'_ _¢.,_E,A.S, ..... D.~.I F.T._._~..E F~_.Z !.C A.. L ................ $ U B .....D R [ F T ............... ~_.0_ T_..A L_. CO_.O R D [ NA.TE $ .................... c ..... L __.0 ..$_.._U_...R~...E $ .............. 5 E_V_ER [_T.~ ............... $ E CT iON DEPTH ANGLE DEPTH SEA DIREC __DISTANCE A.~.GL..~ ......... D_E,._.~L1,D~ F T __D .... ,V, ........ '_____ DEG., D .... M.~ S 65_2.4., :]..9; .......... 64.7.0,19 .... N 5:3,5 OW ...... 24.5.5., 8..5 N 5593_.,._5..8 ......... 6.539,5.8 N 53 · 50W .........1 ~+.92,69 ..... N 6,.6,.5,3._._23___5609.., 23 ..... N 5 ~+ ,. 5.0.W___!_5.2.8.,._91 .... N .......... 2.5..8..&.:...7.O_W~'3_Q.0_3.,_0.~ ~_...5.9_.2.3__~!_W ....... O_,_Z_12__ 2.9.9, 573 '3_,...]. 5 ........... 667.9,15. N 53,5.0 W .......... 1.564,95 ... ti 2.634 ~.80'3,82 67z+9.,82 NSZ+,00W .......... 1501,50 ' 7 ..... 58.7.3., 61 .... 681.9,6 ~ ....... N 5'3,5 OW ........ 1(~3.7.., 95 ...... 59~.2,99 ......6.888.,99. N53,50W ...... 1.6.7.4.,78 N 7Oi2, 38 ....... 6958,38 NS~,00W ........ ~7~1 · 8~ _8~_.5.3_~.I~5~2.0..8. 2.,.. 1..5 _70 2..8~,.i 6 ...... N 53., 50W .......... 1..7.~.8,62 ..... _7.15.2.,_9_:~_ .... 7098,97 ...... NS~,0.0W ..... 1_785,17 ...... 72_2~,29 ..... 7159..,29 .... NSa,00.W .... 1820,95 _7Z93.,.T..~ 72 39.,_7..4 ......... N 5 ~ ,D.0W__i.8 ~ T., 05 ..... ~_~P_~_~ 9 ....45 ....... 757.8 ,_~ 3 ...... T 52 a_,_43 N 52 · 50 W ..... 2003 ~_09_9 ..... 39 .... 15 7650,19 ....... 759.6.,_i9 ....... N52,0OW ...... 2039,35 _9_;~_~39 ..... o ....... 7 6 6.8 ._o 3 .... 7.~ 2~.. 03 ....... N5 2.5o.w ..... 2.o~ 8_...z _92_8_5_~8__~5 779~,93 774.0,93 .. NS1,50W .... 2111 36i_~,.44___N..._.58 24_.27_.W ........ 0_,2.69 .... ~610,08 ..... .__9..Z+.7..2_38 .0_~_7_9.~1.,..5 ~.7_887, 9_565 37~.4.5 ..... 80!.5,06 ....... 79(:1,06 9~58 37 ~ _ 8088 60_ 803~,50 ...... NS0,50W 225~,98 ~ 35~1,2~__.N. 419_.7_,_7_~ ..... N_.5.7_._3~ .... 2 __~ ~_7~_37~ 0 .... 8i6.2_,26__8108,26 ..... NS0,0OW ~ ~ , ~ W ........ · .... 5_N .3628,A8_.~ ._~31.~,00 N _57 19 .... ~_._W ....... _9_8A5 3_8 ..... 0 .... 8236,58 8i82,58 .... N&8 5OW ..... 252_7,8 ' ....... _9.9.3.8__~ 8_ 3 o ..... 8 3_o_$_..6 2 ...... 82.~ 5. sz .... N4 7.5 o,, ..... z 3 e 6,37 .... ,N___~ 67;.. 2.7 .... w .... ~ 67..8 ~ .... N_57 .... ~ ~ ..... ~ w l_O;2.g ..... ~8 (+5 ......... 8~_.55_,_0.5 ....... 8_q.O~.,.Q5 ....................................................................................... RECORD_OF ..... SURVEY - , ..................... &.L.L_.C.A.L CU..LA.IJ[O.N...S...~ P E R F 0 R ~ E D. ~~E.~. .... I_B_,~...._ELEC._tRQ~J[.C_CO_~.P_U_]'_E A ............. , ~.E.~.S.._-_DR_I.F.T__V..ER..T_[.CAL ,sub i DR IFT .................. ~O_?.A__L__COORD..!NATE.$ ........................ C ..... L_Q....$__U_R......E .$ ................ )EPTH ANG L.E DEPTH SEA. ................ D[REC D_4S~LA~.C.,E ......... _ANGLE .....D EJ~i~F_T 10311 39 15' 8600.38 B546.38 N4.5,50W 2527,93 N 3540,00 W .............. 459!.,.~0 .... N ..... 56 ..... 38 3.2 W .............. 0..,266 .......................... Z_OJ+?_7__3...9.__l.5.__.~_7~_47_~_2 ......... 8..6 9 0 · 4.2 ......... N4 5 10590 39 15 8816.43 8762.43 N45 10683 39 45 8888.t9 8B~4.i9. N45 84 ,0 0 W__2_6..!. ~...:.3..3_2.<__3..?Z.:3_,_O.~_w 4_.7..3.2_,_6_7_.N_5_6_2.3L__'Z_W .... O~_~A.O ...... ~,7_iZ.., · OOW ..... 2.6. 52. ,..9.~ N · OOW ......... 2694.77 N 4006,47 W ,SOW ..... 27.78,..41 N N44,50W 2829,79 I ....... ................. 25~ 254. 200_ 0 ........................ 0~1.0._..$ ............................... . 0 0 %5..4 354. ............... 300 0 0 O._2~O.._A ............. 0.._1.0 .... W 454 4'54. 40.0 .................. 0 0 0,_3.~_S ........................... 0, i7 .... 5'54 554, 500 0 0 0,49 $ 0.26 65"~ 854-. 6oo o o O",'g~-'-s ....................... o.'36'-~ F Y~4 75'4', 700 ................ 0 .............................. 0 o. 9"1 $ .......................... -0'"'~ ~ w 854 85~, 800 0 0 1,16 $ 0.62 W 95~ 954, 900 0 0 ., 1.45 5 0.77 W lo54-- i'o5~" .................. i-O"oO .............. O, ........................... o 1.7~'-'~ ............ o'.'~'~ w ....... !.154 .......................... Ii~, 1!00 0 0 ................................... Z.,.!_%.._.~ ..................... 1,1~ w 2i54 2154. 2100 0 0 2254 2 235~ 2 245~ 2 255~ 2 2654 2 13_54 ................................ !3~, .......... 1300 .............0 ...................... 0 .... 2,9.8__$ ........................ I_.,52 W 14.5~._____~ ................ i1~5~, ............ 1400 Q 0 3_,_.~_1..__$ ..................... 1,70 w 1%~, 1..5.5~, ....... 1,5o.o ................. 0 165.4 16.5~., ........... 1600 ............. 0 0 ............................... 1754 17.54, ........... 1.700 .............. 0 ......................... 0 5,~9__S .............. 2,0_O.W ___!.8.5~ ~S~.? ...... !.80o ..................... o ........................... o 6.2~ $ 2.._oo_w 195~ ..................... 1.95~., ........ 1.9.00 ......... 0 0 7_,..11_$ ............... 1,9~_.W ....... 205~ 2054, 2000 0 0 8,00 S 1,80 W 8-.92_$ 1_,60 .... W 254, ........ 2200 0 ...................... 0 ........................... 9_,8.7._S ................ 1,30. W ...... 35~, ........... 23.00 .......... 0 .........................0 ............................... 1Q.,.8.5 ..... S 0,93_W ~5~, 2~00 0 O 11,83 S 0,~6 W 55~, 2500 0 0 12.82 S 0.10 E 65~, 2600 0 0 13.81S 0.75 E 2700 0 0 285~. 2800 0 0 295~. -2900 0 0 3054, 3000 2 ' 2 _ - 3154. 3i00 5 3 325~. 3200 9 4 335~. 3300 15 6 - 1~,$7 S 2,06 E 16,68 S 1,54 g 9.27 $ 5,11 W 0 · 72_5____20.., 03_W 8,19 N 4.3_, 20__W 1!._1.0_~ ....... 73_..23 w 28,82 N 106,37 W 43..o_08_N .......143,7~ W ---2'75'~- ................. 2754. 2955 3_0.5.~ 326z, ~ 32.o 3__428 3587 3 5 5 z+. 35_0_0_ ............... 3 ~ ...................... 1 _0. .................................. $_~.._O_~__N T~OE ................................................................................................................................................................................................................ MEASURED VERTICAL SUB MD-TVD VERTICAL ........ D.E~_~.~ ......... ~.~.~.~ ..... :.SE~ DIFFER_E~..¢E ........ ~_~I~_ECT~ON TOTAL~_C~.D..I..~_~E..$ 3_8..~..6. .................... 37_5~.., ............ p7. oo ....... 62 ................................ _%.? ................................ : ........... 1__0~_,_83 N ............... 2.8.8.67. w 3938 385~, 3800 83 21 130.87 ,N B~i,46 W 4 3 37 4 15 ~ · ................. 4 ~ 00 ......... ~ 83 40 2.~.6_~.3_7__.N ....... 5.8.7_.2 5_W 447 7 4 254 · .............. 4200 ....... 223 ................................... ~..0 2.90..,.~ 9___N ............ 67~, 66.__w 4.6.~ 7 ................. _~ 35.4. ........ 43.00 ........ 2 ~ 2 .................................... ~_g ........................................ p30_.,.P_9_.~ ............... _7.61 ... o. 7..__w ~ 75_6 ~ ~.5.~ · ............. ~..~..qO ............. 302 ~ 0 381,70 48_90 ........................... 655~, .......... 4500 ........ 3.90 ............................ 38 ................................. ~28,.2.! ..... N ............ 929,51 ...... W 5032 4654, ~600 378 38 __4..76,24.. N 1011,35 W 5.305 ....................... ~85~, .......... 4.80.0 ....... ~51 ............ ................. 36 .................................................... 571,45 N 1171,42_W .5_~A 2 ........................... ~ 9.5 ~. .......... 49 oo ....... ~ 8.8 ................................ 37 ..................................... ~.19....9%_N ............... 12.51, 5.6_ W 558_1 50_5.~., ....... %000 .......... 527 %9 671~_63 N 1.3_32., 6_O_.W ~_5_72.0 .................... 515&, ........ 5 !00 566 ..................... 3~ 7_2~_,.~8 ..... N ....... 1.413, 13 58_60 ............................. 525~, ..... 5200 606 .............................. 40 .......................... ~!5,_O?__.N ............ 5~.9.Z 535_~., .......... ~3.00 .....6 ~ 3 37 82~A.~.5~._~ 157_7., 61~3 ..................... 545~, ......... 5~00 679 6~69 ................... 5554, .......5500 715 6&05 555&~ 5600 751 8542 575~, 5700 788 .................... ...... 827 869 909 9~8 i023 1059 i094 1128 ..... 1151 33 ....................... 8048 68.5~, 6800 1!93 32 - _ 8.182 ................. 6.95a ~ ....... 6900 I~28 ....................................... 3_5 1680,_7_6_N ....... 2_791,55 ....... 83_15_ 705.~_, ........... 7000. i261 .................................. 33 ..................................... 1]~.~_,_7.~_ N ............ ~86~,33 6682 585~. 5800 6..8.2_3 5.9_5_~., ........ 5?.00 6_9_63 .............. 605~. ...... 6000 ......... 7.102 .............. 6154: .......... 6100 7_2..~.0 __~_2.57. ........ 6 Z 00 7377 635ao 6300 ............................................ 75_13 ................ 6.~5 z,_. ...... 6aO0 7648 6.5.54 ,_. .6.5 C 0 7X8.2 ................ 6_65~_. ........... 6600 7915 675~, 6700 ................................... ............................... 36 ............................ 8.7_1_..41 .... N .......... 1656.59 w , 36 919,90 N 1734,71 W 36 969,27 N 1812.48 W 37 1021,18 N 1890,42 W 39 1076.60 N 1970.62 W ~2 1134,70 N 2051,57 W ...................... 40 .......................... 1.!~_2 .~ 2.__ N ........ 2131.20..W ........................ 39 ........................... 1.250,25 ....N ....2208.55 W 3_8 !3_0.5~..9_2__N ........ 2285., 15 ..... W .................. 3_7 ............................ 1.3_63_.,29 _N .... 2359,95 W ......................... 36 ........................... !_~_~_a_,?_7__ ~ .... z ~_3 3 · 6~__w 34 1_5~_. 57_.._N ......... 2577., 83_W ......................................................... 1627,77 N 27i9.8~ W ..................................... TRUE MEASURED ................... ~"'ERTI'EAL SUB r¢l .................. DEPTH ............................. DEPTH ..... SEA DIF 8580 7251~. 7200 8712 ................. 7'35~--. ........... 7'300 ..... 8'8~"3 .................... 7'45'4i ............ 7400 8974 7554. 7500 326 ........................................ 32 18-36.-37 N .... 3002.68 w 358 ............................................................ 32 ].88-8'."0'2 ..... N ........... ~071.51 W 389 31 1939,50 N 3138,94 W 420 31 1990,94 N 3205,63 W 910'~ .......................... ?654. 7600 '-1450 ..................................... 30 '9'2r'3--2 7"~'54'"~ ............... 7'700 1478 ........................... 28 9~60 7854. 7800 ....................................9488 ? 9 5'a-' .............. 7900 '~'61'4 80-5'4', ..... 8000-" 1 9867 8254, 8200 1 9995 8'3'5'4'; .............. 8300 ........ ~5't'-23 .......................... 8454. 8~00 1 10'2~1 ............................ 8-~5-'~'. 8~00 --1038'0 8'6'5W" ............... 8'600 1'0'509 ..................... 8?54, ........ 8700 f06-3 ................... 8 88-~4'. .... 8 800 10768 89"5'4". ........ 8900 1 I0~96 9054', ........ 9000 1 ....................................................................... 11023 9i54. 9100 1869 2 668 27 697 29 726 29 755 29 784 29 .................... -2¢-5:["-5-'0"-N .......... 3S 1 z. 8 4 w 2559,00 N 3870,67 W 2616,70 N 3928,40 W 2674,47 N ~986,18 W 814 30 2733,22' N 4044,33 W 8~2 18 2~-8'9'8-5 ..... ~ ......... ~ioo.o8 w 7 2845.51N 4154.80 W FEET OF MEASURED .... DEBT_Id. TRUE ..... -I~'E'"A'~-U RE-D- ........... -V'~"F~-~" i' C:A L ........ S U B D E P T H D E P T H 5 E A ~,Q T. AL ........... .¢.QD...R..D_]:._N 3000 2998, 2944. 5,94 $ 10,87 W 4000 3903, 3849, i46,57 N 385,0~+ W ..5000 463o, 4~76. ~.6~-'"96' N 7.000 5080. 5026. 1207.8~ N loooo 8. :_.s 8., ........ 83 o~. z 372..~ ............. :i: N '[. E R ~.. C). L A ,.,T E D..... _i. R_!J F' V iF.. R ..T,~ I ¢ TRUE :_O.D ~ M ~ AS.UIR..,E D ................... _.v_ E.R T..t CAL ~_~E .................... ID.E.,EI.t:t ................... ................ : ......... ~ ' .................. ~ SCALE VE RTICAE'-'SECTION. ........ i ....... ...... i ..................... ~ ............ . ....... = I000', ~ ! ........ 400 ......................................... ATLANTIC RICHFIELD COMPANY ~ i -DRILL' SITE 9--14 .............. : .............................. ~. ........... '__ .t ....i ..... ~ .......... RADIUS OF CURVATURE---'. '--.'; ................. i ............ 800 ........................ f .......... ~ .......... i'- MAGNETIC MULTI-SHOT .... ' 'l: : --i ....... ~'~'~ - i ..... ' .... ; . ,_ ~ ............. 2400 ..................... ; ........... ~ * ~ '- ; t - ................. . ..... ~ . . _ .' :, _ .--'."_.~ .... . [ - - . _. ARE TVD ~ .................. ~ ...... ~ .... i ........ ; '- ..... ; ................. . ...... ~ ........... , ....... .... .................... ~ ........................................................ ' ........................... 6( ........... ' ......... ..... . ....... .................... ............................ .. ...................................... ; .............................. I ' ~ '- - ~ . . ..... ~ ~ . ....__.-.---.~ .... " ...................... i ............... ~ ........ ~ ...... i ~ · .................................. ~ ........................... ' 760( ~ .... ................ ~ .... ; ........... ~ ....... ~ ..... --~ .... ~ ........ ;__ . ] .... .-~..~ ...... ~ ............... : ....... _.'_ ........ : ..... "-_ - '-2_ '_;__~_~.~/ ,.L .......... -_t _L~'---t-'_~'/_"2.2i_L--.L'/iL-_~ '_--2._L-.L__. _ ~_ ' ~ ~ ' - ,::-_~-_-_:.-~-..: .... ~ -- ~ ........ ~ ......... ~ ......... :_... ,- ._ ...... ~ -'- ~ : .....~ ............ ..... ~_._~._.~-._.:._:'-:. - _. --_--_?- :-:._-.:~-_-::____ -_- ~ .. ~.- ~ .~...- ~-~. ~ -- ~... -:~ ...... ..... ~ ' .... ' ~- /-li':~- .................................. ~ .. ' .:/_ -~" ..... ~-'-_" ............ .'. ~ .................... '-' .-" X' ....................... ' ~i ........... - i ...... ~ ....... ~ - " T D= 9,199 -- ''" , -' 1 ~ ~ ...... ' ' V ' - SCAEE- I"='lO00". . . 1 ATLANTIC RICHFIELD COMPANY DRILL SITE 9 14 RADIUS OF GURVATURE MAGNETIG MULTI-SHOT ............ '. - - e4oo~-~ ..... i ............ ! "l ARE TVD. ' -J ' -; .... ................ e8~ - ~' , ....... i ..... ; '- .. . "" -- -.-.-:.'--'-:-..'.: -_; .'. '---_!-.-i _ ~ooo~,,.~. ~.~_ ~-..-._.... ~ ~ : ..... :' .:__' ...... '.. ' '. ~'-_ .';i_'~' :. ".. '..: ;. ~. '.' '-~~~ 4~o~~,~_ ~ :. i ......',--' - : · . ...................... : ............... ~ ....... ~:~ .... _ .....~.~o .--~-~T-'.T~ ........... ........ .-'-T-~ -' - _. ........ . - - ......... ..... ~ ............ . ..... : ............:-. ...... ,. .~ ' . - :.-. . . ...................... ~ ............. I ....................... : ....... ' ................... ' ....... ; ....... · ................. ~ .............. : ....... ~ ..... ~ ._ ..... ~ ..... ~ ~ ...... ~ - ; I i . AtlanticRichfieldCompany North American Producing Division North Ala ')istrict Post Office ~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 September 1, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas JO01 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 1-7 (13-7-10-15) Permit No. 75-17 .6., Drill Site 2-6 (23-35-11-14) Permit No. 70-61 Drill Site 9-13 (13-7-10-16) Permit No. 77-8 ;---J--C~:' 'ENO --'T'-'f '__.-Zi_IZ* I 5 ENG -' '1-'~ I ~. C~OL ~ 3 GEOL REV ........ -.i.-~,XF.t ~ SEC CONFER: ................. FILE: ~,, ~_S_.i__te g ~l~r ( 2 - 10-15 ) ~F~rmi t No. ' 77-25 Drill Site 9-15 (1-10-15) Permit No. 77-36 Dear Sir' Enclosed please find our Sundry Notice outlining our plans for the above mentioned'wells. Very truly yours, Frank M. Brown Di,strict Drilling Engineer /am · Enclosures , ~ f_. (.i ,.,i'f Fgrm 10-403 REV. 1-10-73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drlll or to deepen Use ,,APPLICATION FOR PERMIT---" for such proposals.) O,L ~ ~AS r-1 WELLV~ i WELL~ J OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.0. Box 360; Anchorage, Alaska 99510 4. LOCATION OF WELL Atsu,ace 1112'N & 125'E of SW cr of Sec~ 1, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, PT, GR, etc.) 14. 5. APl NUMERICAL CODE 50-029-20249 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudh0e Bay Unit [9. WELL NO. Drill Site 9-14 (2-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe 0il 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 2, T10N, R15E, UM 12. PERMIT NO. 54' RKB 77-25 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: FRACTURE TREAT MULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASING SHOOT OR ACIDIZE ABANDON* SHOOTING OR ACIDIZING ABANDONMENT* REPAIR WELL CHANGE PLANS (Other) (Other) Perforate (NOTE: Report results of multiple completion or~ Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of Pool starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval.' 'All perforated intervals will be reported on'subseqUent report. '. A 5000 psi' WP wireline lUbricator;--tested to working pressure, will be utilized with all wireline Work. 'All perforations will be made with hollow carrier'type guns'at 4'shots per foot. Well will be flowed to a surge tank to recOVer~load fluids and any produced well · fluids. All recOvered'liquids will be retained in the surge tank, then t'rucked to the'0ily waSte'clisposal facilities for disposal. Any prodUced gas will'be vented'to the atmosPhre'during perforating operationS..' 'The down'hole safety'valve Will be installed and tested upon'conclusion'of'job~' ' , Estimated Start Date' 9/i8/77' ~ 16. i hereby cert~'th~rue and correct 51GNED_ TITLE District Drilling Engineer DATE (This space for State office use) Petroleu:n En?i~;eer See Instructions On Reverse Side DATE ~-:--~-77 Copy Returned AtlanticRichfieldCompany North Ameri;~'' oducing Division North Alask~ ..... ict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 12, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Divi. sion of Oil and Gas 3001 Porcupine Drive Anchor. age, Alaska 99501 Subject: D.S. 9-14 (2-10-15) Permit No. 77-25 Dear Sir' Enclosed please find our Monthly Report detailing the work done on the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer FMB/am RECEIVED A $1,g77 DJvi~ll0fl g~: Oil ~iri~ (]~,~ Con~erva[ion ~rm No. P--4 I~EV. ~- 1-70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITrEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT ~ ]DUPLICATE "~. APi NU~CE~LICAL CODE 50-029-20249 LEASE DES~GNA'FION AND SEIqIAL NO ADL 28327 Atlantic Richfield Company P.O. Box 360; Anchorage, Alaska 99510 1, TION, R15E, UM 1112'N & 125'E of SW cr Sec. 8. L.~NIT.FAR~q OR LEASE NAME Pru. dhoe Bay Unit 9. WELL NO DS 9-14 (2-10-15) lO. FIELD A~ND POOL. OR WILDCAT Prudhoe Bay Fi el d-Prudhoe Oil Pool 11. ,SEC,, T., R., M., ~BO~1'OM HOLE o B,,rF, c'~FVF_3 Sec. 2, TION, R15E, UM 12. PEI~IIT NO. 77-25 "~'3.' REPORT TOTAL ~E~'TH "~'T END OF" M3~TH~ ~M~G~ ]N HOLE SIZg. c~'S"ING'' 2D -C~TING JOBS INCLUDING DEPTH S~T A~ VOL~ USED, P~O~TIONS. ~TS ~ ~SULTS. ~ZSHING JO~. J~ ~ HO~ ~D SIDE-~CKED HOLE kND ~Y O~ SIGNIFIC~T ~G~ ~ HO~ ~ITIONS. Report of Operation for the month of July. Spud @ 1530 hrs 7/16/77. Drld 17½" hole to 2750'. RU & ran 13-3/8" csg w/shoe @ 2712"", F~C'~ 2633'. Cmtd w/6800 sx Arcticset cmt. Did top job w/150 sx Arcticset cmt. NU & tstd BOP. Drld out shoe & 10' new form. Tstd form to 12.5 ppg equiv. Directionally drilled 12~4" hole to 10,265' as of July 31, 1977. RECEIVED "AU 1 5 1977 l)ivlslon e~ Oil allCI Gas L,u,~o~rv:.'.~/,,:~ 14. I hereby Ce~ti~y~ 13xat the .f6'?egoing i~ ~:rue arid' c~r~ ........... '-' .... s~ ~,~C ~~'c,---~ .m"~ ,Distrin~ Dri I l inq Enqine~ NOTE --Report on this form it required for each calendar ~nth~ regardless of the ltotus of operations, end must M filed in duplicate with the oil and gas conservation commiflee by the 15~ of the suec~ding mon~, unle~ Otherwise directed. 02~01B STATE ~ of ALASKA TO: F Division o~.' Oil and Gas Conservati(m O. K. Gilbreth, Jr.A~~ Director Itoyle ii* Hamilton /~ DATE : July 26, 1977 ~ief Petrolet~ ~ineer' FROM: ~rold R. P~awkins SUBJECT: l'!i~s BOP Tests for ~zco DS 9-14 Sec. 2, TIRq, R15E, U.N. P~_nnit }-~. 77-25 ~sd~i, July 19, 1977 - I left ~ house at 4:00 PM. for a 4:30 ~,I check in ~¥%qien Airl~ for a 5:30 flight to P~_~. ~. of the trip was %0 witness BOP tests for Arco on DS 9-14. Ben Davis was the .operator for Arco. Jim Weatherly was the ~ for Rowan on Rig 34. ~3a~n I arrived, Rc~n !~h~_sday, July 20, 1977 - Tests began at 4:30 AM. ~Tne annular preventer ~ ~~ '~ ~-30:00' ~i.- i~e upper pipe rmv, inside kill and inside choke plus the l~er kelly ~_re tested to 5000 psi. ="~e ~eck valve w~s d/sabled. With th~ lower pipe rams still closed, ~]-~ cuts~ kill and ~atside choke valve w~re tes~ued to 5000 psi. With the upper p~e rams still clo~d, the '~ kelly, the check valve and 6 valves away f_rcm the stack in the cellar v~_re tested to 5000 psi. ~xt the ~ pipe r~ and three }~lli- burton Ic~ torque wing valx~s %~re tested to 5000 psi on the manifold. The Swaco super~hoke ~J~ three, n~"e Hall/burton lc~ torque wing. valves were tested to 5000 psi. TP~ test s~ was ~ulled and the blind rams w~re tested to 5000 psi. A f~ gave way and a seal ring had to be replaced t~fore the blinds tested. Tests ccncl~ at 8:30 AE. I c~ the location and it w~s free of debris, ~ ~ pit was open but well benton. Theure was a ball valve ar~ dart valve on floor OK. Also the manually operated choke on the. manifold w~rked freely. I also checked c~ the a~tor and ~ and naster c~ntrols v~ich w~r~ satisfactory. The mas~_r gauge ..had. 2900 .psi. There were 4 nitruge~ back up bottles %d_th 1900, 2000, 2000, and 2000 psi each. The ~11 sign ~s up and all data fYK. In mmm~: I witnessed the BOP tests for Arco on drill site 9-15. fasts ~ cc~.~lete all BOP e?ai.rm:~nt was in good condition. Tests satisfactory. Attac~nt ~'~i~ Ala~ ~ Oil and Gas Conservation Commi _~. - .~ Field Inspection Report ?.??~.Drl~...~e.rmi't' '- Well/Platfm Seq2_~__T/.i~A/R/.ijf'~, ~ M Operator Represented by~ ~_..~'/~. _Name & Number _~~' Satisfactory on Yes No Item :s n ('~') 16. Te i ~. Reserve Pit- )filled ~ ~ ) 17. Master HYd. Control sig ( ) 4. Rig ),~ , ) 18. N2 btls rests ~ ~..) 19. Remote C () () ',y) () . 21 Kill L~.ne-~ ck Valve t( ) Well Test Data Z) ( ) 22. Choke Flowl ~e ( ) HCR valve ( ) ( ) 7. Well Nos. , , , ~) ( ) 23. Choke Manifold No. valvs~ flos~ (..) ( ) 8. Hrs. obse~ ~~~ ~ ( ) 24. Chokes-~)Remote( )Pos.~dj]~' [ ~ ( ) 9. BS&W ,--,--, ~) ( ) 25. Test Pl~O-~)Wellhd( )cs~( )no"e ( ) 10. Gr. Bbls. , , ,__ X) ( ) '.26. Annular Preventer~sio ( ) Fina~andonment )) ( ) 27. Blind Rams ( ) ~ ) ........ I ~ ) 28,: Pipe 'Rams ( ) ) ~eli-( )Capped( )plugged I () (.) 1:3~ Cl.ean,up ' ( () ~:' '14.~:Pad (') pecti on ~days J~.~e 3, 1977 A~c ~ichfteld Ompany No. 77-25 Atlantic ~~ ~f P. O. ~ ~0 ~age, Alaska 99~i ~~ is ~ approved applicat/on for permit to drill the above referenoed well at a loca~ in Section 2, Township 10N, Range 15E, U.M. Many rivers in A!_mska ~ their' drainage SYSt~ns have been classifie~ as i~t for ~ spawning or migration of arians fish. Operations in ~hese ~s ~ ~bj~ to k~ 16.50.870 ar~ the re~.. ~tions preheated ~ (Title 5, Alaska ~strative OxIe). Prior to omnmencin~ oF~rat~ you my be con~ by the Habi~t Coordinator's office, Depart- Polluticn of any waters of t/-~ Stat~ is prohibited by .~ 46, Chapter 03, Article 7 an~ ~ regulations o~xmalgatmd th~_z~under (Title 18, Alaska Adm~~ative ~, Chapter. 7~) ~ by the Federal Water Pollution Control ~, as ~ed. Prior ~ ~ing operations you may be cc~tacted by a representative of ~ DeF~t of Environmental Conservation. I~arsuant to ~ 38.40, ~1 }~J~e Unde~ State Leases, the Alaska De~t of Imbor is being notified of ~ is~ of this F~mit to ¢lrill. To aid ~ in schedul~ field work, %~ would appreciate, your noti~.,ir~j ~is office within 48 ~s af~ ~e w~_ll is sr~added. ~ %~/d also li~ to be otified so that a reparative of the Division may he .present to witness testing of blow~/t preventer equil~t before surfac~ caslr~., shoe is drilled. -2- June 3, 1977 In ~ event of suspension or aba~Wm~m~t please give this office adequate ~ not/ficatic~ so that w~ may bare a witness present. Very truly ~, ~ Oil ~nd Gas (Ix~erva~ C~mnittee De~t of Fish and ~, F~abitat Section w/o ~1. Department of Env/rom~al C~rvatio~ w/o encl. Division w/o ~1. Atlanti~cRichfieldCompany ~ North Amed~en Producing Division North Alas~ Jistrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 3, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-14 Dear Mr. Hamil ton: Enclosed herewith is our Application for Permit to Drill DS 9-14, a $100.00 filing fee, and the required survey plat, Very truly yours, Frank Brown District Drilling Engineer /vp Enclosures RECEIVED Oivl~lOll f,,li ~i ~ ~as Conservation Form 10-401 REV. 1-1-71 la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUBMIT IN TRI ~TE (Other instruc' an reverse si(lc) PERMIT TO DRILL OR DEEPEN b. TyPE OF ~,~;LL OIL ~,~LL ~ ~ DRILL FX] DEEPEN [~] GAS SINGLE WELL [] OTHER ZONE MULTIPLE ZONE [--] -3.. NAME OF OPERATOR Atlantic _Richfield .~~mp,a,,nY 3. ADDRESS OF OPERATOR 'P. O. Box 360, .Anchorage,. Alaska 99510 4. LOCATION OF' WELL At surface II12' N f 125' E of SW ce Sec. 1, TION, R15E, UM At proposed prod. zone 1320' S f 1320'-E of NW ce Sec. '2,_TION, R!SE, UM 13. DISTANCE IN bllLES AND DIRECTION FRObl NEAREST TO~SN OR POST OFFICE* Approximately 6½ miles.north east of Deadhorse, Alaska API No. 50-029-20249 6. LEASE I)ESIGNA'IION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLO'ITEE OR TRi BE NAME · . 8. UNIT FARM OR I.FAS[', NAME Prudhoe Bay ~9. WELL NO. D.S. 9-14 (2-10-15) 10. FIELD AND POOL~OR S~,ILDCA1~ / Prudhoe n~v_c~~t Pool 11.SEC., T., R., bi., (BOTI'OM IIOLE OBJEC[IVE~ Sec. 2,TION,R!5_E~ U.M 12. 14; BOND INFORMATION: TYPE Statewides~ret~a,d/o~NoFederal Insurance Co. 8011-38-40 Amo-nt $100,000.00 15. DISTANCE FRONI PROPOSED * 16. No. OF ACRES IN LEASE . 2560 19. PROPOSED DEPTH ' 1 120SMD 9284TVD 17.NO ACRI£S ASSIGNED LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. i 320 (Also to nearest drig, unit, ii' any) 18: DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2640 ~I. ELEVATIONS (Show whether DF, RT, CR, etc.). TO Tills WELL 160 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE WORK WILL START Pad Level (Gravel) August 15, 1977 23. PROPOSED CASING AND CEMENTING PROGRAbI SiZE OF HOLE SIZE OF CASING' WEIGHT PER FOOT GRAD~ SETTING DEPTH Quantity uf cement ZO" 94# . H-40 100, +; Circ. to surf ar)r)rox,. 500'--~x. 17½ 13-3/8 72# N-80 2700' -* Circ tS surf approx B50u 12% 9,5/8 .47# N-an 1170~' L ?~00' -rmt column on 1st. -a S00-95 !000 sx 300' cmt on.gnd-~ , , .... . x stage _ ge--1-2 +__ sx 'Atlantic Richfield Company proposes to directionally drill this well to l1205'+_MD, 9285'!TVD to produce the Sadlerochit Zone. Logs will be run across selected intervals, A 13-5/8" 5000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/8" casing. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5½" 17# N-80 tubing, paCker and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. The well will not be perforated at this time. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. IN ~O~ sPACE DESCRIBE PRO~SED PROGRAbl: If propo~ is :o deepen'give ~ata on present productive zone and proposed new productive zone. If propo~l is to dr~ or deepen dkecfion~y, ~ve ~rfinent data on sub~ce locations and measured and true vertical depthg Give blowout preventer pro.am. 24. I hereby ce~ that the Foregoing~_~zn.d Co .... t SIGNED, LZ/~~ ./'~ . (This space for State office us6) SAMPLES AND CORE CtlIPS REQUIRED [] YES IX NO DIRECTIONAL SURVEY REQUIRED [] NO PERMIT NO. MUD LOG [] YES CONDITIONS OF APPROVAL, IF ANY: [~NO [ OTHER REQL'IRE.~IENTS: A.P.I. NUMERICAL CODE 50-029-20249 APPOVED BY 77-25 APPROVAL DATE *See Instruction On Reverse Side . June 3, 1977 .DATE ,'II11'10 1977 SEC. i1 SEC. ;EC. CERTIFICATE OF SURVEYOR t HERE BY CERTIFY THAT i AM PROPERLY REGISTER~ AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA A~4D ,.-'HAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION AND ALL DIMENSIONS ANQ OTHER DETAILS ARE CORRECT. / &'14 Surveyo~, /~ /~' ¢ /. & 20 ~ ~/_ _,~ ~ ....· . . Surveyor / AS BUILT WELL LDC. Ai IUJ',,lb ~ LL No. 12 , ,F. 70° 14' 46.838"Y 5 942 815.87 LONG. 148° 14' 06.527"X 7 t 8 456.54 WELL No. 1'5 LAT. 70014' 45.684"Y 5 94-2 699.30 LONG. 148°14' 05.804"× 718 484-.81 WELL No. 14 LAT. 70°I 4' 44.552"Y 5 942 582.98 LONG. 148014' 05.07~,"X 718 51'~..~2 WELL NO. 15 " LAT. ?0© 14'. 45.377",Y 5 942 466.50 LONG. 148° 14'04.352_'X 718 541.52 .WELL No. 16 LAT. 70© 14' 42.221':Y 5 942 549.60 LONG. t48° 14' 05.613-X 718 570.432 WELL No. 17 LAT. 70° 14' 41.065" Y 5 942_ 252_?9 LONG. 148° 14'02.895" X 718 598.50 WELL No. 18 LAT. 70° 14':59.910" Y 5 9~2 Ii6.14 LONG. 148° 14'02.176" X 718 626.56 WELL No. 19 LAT. 70° 14, LONG. 148°1 01.44-2_ ^ ?18 655.18 WELL No. 20 LAT, 70° 14'37.606" Y 5 941 885.42. LONG. 148 14'00.'T21" X 7[8 683.$7 ARCO No. HVLNo ~S9-DS.S-7? ~i ATLANTIC RICHFIELD CO. : AS BUILT DRILL' SITE No. 9 WELLS No. I2,1.5 6:14 LOCATED Ih[ PROTRACTED SECTION 1,T. iON.,RI 5 E.,U.M. HEWITT V. LOUNSBURY & AS$OE. '725 W. 6fh AVF_J',ILIF. ANCHORAGE ,.ALASKA DATE FEB. 19"77 SCALE I"= 2.00' ~.~4 ~4n p..Y po. FIELD Bt(. ,J ....... CHECK LIST FOR NEW HELL PERMITS Company Yes No Remarks 1. Is the permit fee attached ..................... Lease & Well No. Z~)~ ~ ~D_/~ 2. Is well to be located in a defined pool ............. .. 3. Is a registered survey plat attached ................ ~/< 4. Is well located proper distance from property line . .. ....... /~ 5. Is well located proper distance from other wells .......... ~W~ax: 6. IJ sufficient undedicated acreage available in this pool ...... ~ 7. Is well to be deviated ....................... Z~J~ 8. Is operator the only affected party ................ //~2~ 9. Can permit be approved before ten-day wait ............. Az~)~ 10. Does operator have a bond in force ................. ~ Il. Is a conservation order needed ................... 12. Is administrative approval needed ................ 13. Is conductor string provided .................... 14. Is enough cement used to circulate on conductor and surface .... 15. Will cement tie in surface and intermediate or production stri.ngs 16. Will cement cover all known productive horizons .......... 17. Will surface casing protect fresh water zones . . .' ..... . 18. Will all casing give adequate safety in collapse, tension & burst 19. Does BOPE have sufficient pressure rating - Test to ~000 psig 20. Has DMEM' approved Plan of Operation ................ Additional Requirements' ~_~,_~ ~,~ -~~'"~'~'~L'~' Approval Recommended: Geo 1 ogy: Engineering: T RM ~1~q4¢~ -~--~ HHH ~CM ~:~ HWK ..~/-~_ LCS AD Revised 11/17/76