Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout178-0601a. Well Status:Oil Gas SPLUG Other Abandoned Suspended GINJ WINJ WAG WDSPL No. of Completions: 2. Operator Name: 3. Address: 4a. Location of Well (Governmental Section): 4b. Location of Well (State Based Plane Coordinates, NAD 27): 5. Directional or Inclination Survey: 6. Date Comp., Susp., or Aband.: 1b. Well Class: 7. Date Spudded: 14. Permit to Drill Number / Sundry: 15. API Number: 16. Well Name and Number: 17. Field / Pool(s): 18. Property Designation: 19. DNR Approval Number: 20. Thickness of Permafrost MD/TVD: 21. Redrill/Lateral Top Window MD/TVD: 8. Date TD Reached: 9. Ref Elevations: KB: 10. Plug Back Depth MD/TVD: 11. Total Depth MD/TVD: 12. SSSV Depth MD/TVD: 13. Water Depth, if Offshore: GL: BF: Development Service Exploratory Stratigraphic Test 20AAC 25.105 20AAC 25.110 Surface: Top of Productive Interval: Total Depth: Yes No(attached) Surface: TPI: Total Depth: x- x- x- y- y- y- Zone- Zone- Zone- Submit electronic information per 20 AAC 25.050 (ft MSL) 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. CASING WT. PER FT.GRADE TOP BOTTOM TOP BOTTOM HOLE SIZESETTING DEPTH TVDSETTING DEPTH MD CEMENTING RECORD AMOUNT PULLED CASING, LINER AND CEMENTING RECORD23. Yes No Yes No 24. Open to production or injection? If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd or liner run): 25. TUBING RECORD SIZE DEPTH SET (MD)PACKER SET (MD/TVD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic information DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED 27.PRODUCTION TEST Date of Test:Hours Tested: Flow TubingPress. Casing Press: Oil-Bbl: Oil-Bbl: Gas-MCF: Gas-MCF: Water-Bbl: Water-Bbl: Choke Size: Gas-Oil Ratio: Oil Gravity - API (corr): Production for Calculated 24-Hour Rate Test Period Method of Operation (Flowing, gas lift, etc.): WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 11/8/1978 50-029-20323-00-00 PBU 13-01 178-060 9985' / 9444' PRUDHOE OIL ADL 0028315 77-04210055' / 9519' 2201 / 2201 ~1900' n/a 0 3/3/2024 n/a 11/24/1978 ASP-4 ASP-4 ASP-4 5932355 5934076 5934300 687151 685499 685408 DIL / SP , BHCS , FDC/CNL/CAL/GR, GR/CNL/CCL 1003' FNL 1750'' FEL Sec.14, T10N, R14E, UM 1229' FNL 1664' FEL Sec.14, T10N, R14E, UM 2990' FNL 56'FEL Sec.14, T10N, R14E, UM 20"94#H-40 Surface 129 Surface 129 24"167 sx Articset II 13-3/8"72#N-80 Surface 2738 Surface 2738 17-1/4"6800 sx Articset II 9-5/8"47#N-80 Surface 10033 Surface 9498 12-1/4"1250sx Class G 7"29#L-80 Surface 9761 Surface 9239 n/a 5-1/2" 17# x 4-1/2" 12.6#9090 8993 / 8521 see attachment pumped ~568 bbls cement for P&A 9222' - 9240' 8734' - 8750' 9326' - 9350' 8831' - 8853' 9360' - 9386' 8862' - 8887' 9386' - 9397' 8887' - 8897' 9397' - 9413' 8897' - 8912' 9413' - 9415' 8912' - 8914' 9435' - 9475' 8933' - 8970' 9491' - 9529' 8985' - 9021' Not on Production Surface 74 323-074 PRUDHOE BAY Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Date First Production: Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov By Meredith Guhl at 12:46 pm, Apr 19, 2024 Abandoned 3/3/2024 MDG RBDMS 4/19/2024 MDG xG DSR-4/23/24 MGR08JULY2024 MGR23DEC2025 28. CORE DATA Conventional Cores(s): Yes No Sidewall Cores(s): Yes No If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and persence of oil, gas or water (submit separate pages with this form if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered)30. FORMATION TESTS Well tested? Yes No If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this for, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. MD TVDNAME Permafrost - Top Permafrost - Base Top of Productive Interval Formation Name at TD: 31. List of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071 Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. TPI (Top of Producing Interval). The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: INSTRUCTIONS Bo York Operations Manager Oliver Sternicki Oliver Sternicki@hilcorp.com (907) 564-4891 88199322' Daily Operations Summary, Wellbore Schematic, Well Photos Top Sadlerochit Base Sadlerochit 9322 9916 8819 9378 Kavik 10033 9498 Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.04.19 10:53:53 - 08'00' Eric Dickerman (4002) WELL NAME: 13-01 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used Surface -Control Line Pump 2.5 gallons of FINECEM to 2500 psi Surface -Balance Line Pump 2.5 gallons of FINECEM to 700 psi Tubing Pump 20 bbls of 14ppg Class G 8974' AOGCC witnessed Tag TOC Tubing punches ~8895' - 9500' ~ Tbg /IA Pump ~ 500 14.0 ppg Class G to cement @ 2769 psi ~2400' AOGCC witnessed Tag TOC Tbg / IA ~2400' Pump 500 bbls of14.0 ppg Class G cement OA - Surface Pump ~68 bbls of 15.8 ppg perma-frost blend .65bpm @ 370 psi Tbg x PC Annulus 22 gallons of 15.8 ppg AS-1 cement PC x SC Annulus 3 galls of 15.8 ppg AS-1 cement ACTIVITYDATE SUMMARY 4/28/2023 T/I/O= 25/165/0 Temp= SI TFS unit 4 (CMIT-TxIA) CMIT-TxIA ***FAILED*** Pumped 8 bbls crude to Reach Max psi of 2500, Target psi of 2200. 1st 15 min TxIA lost 120/113. 2nd 15 min TxIA lost 75/76 psi. Total loss of 195/189 LLR @ 3.5 GPM ***Job continued on 04/29/2023*** 4/29/2023 ***Job continued from 04/28/2023*** TFS Unit 4 (CMIT-TxIA) CMIT-TxIA ***FAILED*** to 2500 psi. Max applied pressure of 2500. Target Pressure of 2200. 1st 15 min TxIA lost 66/64 psi. 2nd 15 min TxIA lost 59/57 psi. Tags hung on V & IAC. FWHP= 250/235/0 4/29/2023 ***WELL S/I ON ARRIVAL*** RAN 4.52" G RING TO TAG XO @ 6938' MD SET 3.75" WHIDDON CATCHER @ 8950' SLM (unable to pass) RAN 5-1/2" BRUSH, 4.52" G-RING TO BRUSH MANDRELS. *** CONTINUE ON 4/30/2023 *** 4/30/2023 TFS Unit 4 Assist S with MIT-T (Pressure Test) Pressured up TBG with 2.6 bbls crude to Reach max applied psi of 2000. No TxIA communication. Bleed TBG back to Starting pressure. SL in control of well upon Departure. FWHP= 535/521/0 4/30/2023 *** CONTINUE ON 4/29/2023*** PULLED OV FROM STA 4 & 3 @ 6915' & 6798' MD PULLED RK-LGLV'S FROM STA #2 @ 5,085' & ST#1 @ 2,983' MD SET RK-DGLV IN ST#1, @ 2,983', ST#2 @ 5085', ST# 3 @ 6798', ST# 4 @ 6915' MD 10 MIN 2,000 psi MIT-T PASSED PULLED 3.75" WHIDDON CATCHER @ 8947' SLM RAN 4-1/2"" BLB, 3.73" G-RING, UNABLE TO PASS 8,951' SLM ***CONTINUE ON 5/1/23*** 5/1/2023 ***CONTINUE FROM 4/30/23*** BRUSHED TIGHT SPOTS IN TBG PULLED PRONG FROM 4-1/2" PXN-PLUG @ 9077' MD (scale buit up around prong) BAILED SCALE FROM 4-1/2" PXN PLUG @ 9077' MD ATTEMPTED TO PULL 4-1/2" PXN PLUG @ 9077' MD ***CONTINUE ON 5/2/23*** 5/2/2023 *** CONTINUE FROM 5/1/2023 *** RAN 10' x 2.25 P-BAILER TO PXN PLUG BODY @ 9,077' MD, RECOVERED ~3/4 CUP OF FINE SAND AND SCALE CHIPS RAN 10' x 2.25 P-BAILER TO PXN PLUG BODY @ 9,077' MD, EMPTY BAILER RAN 4-1/2" GS, SD & LATCHED PLUG @ 9092' SLM, HIT 1,800 TO 2,000 LBS OJ LICKS FOR 45 MIN - SHEAR OFF ATTEMPT TO PUMP DOWN TBG, PRESSURES UP TO 2,500 PSI RAN 10' x 2.25" PUMP BLR TO PXN PLUG BODY @ 9,077' MD, RECOVERED ~ 1- 1/2 CUPS OF SCALE RAN 2.50" HYDROSTATIC BLR W/ SNORKEL BTM, SD @ 9,077' MD, SEE PRESSURE DECREASE, EMPTY BAILER MOVED 3.81" PXN PLUG UP TO 9001' SLM STUCK IN SCALE ***CONTINUE ON 5/3/23*** 5/3/2023 T/I/O= 900/0/0 Temp= SI TFS- U3 (Assist Slickline). Pumped 43 bbls of crude down the TBG. *Job continues to 5-4-23* Daily Report of Well Operations PBU 13-01 Daily Report of Well Operations PBU 13-01 5/3/2023 ***CONTINUE FROM 5/2/23*** BROACH TIGHT SPOT IN TBG @ 8945' & 9006 SLM PUSH/PUMP 4-1/2" PX PLUG BODY DOWN TO XN-NIP AT 9077' MD ***CONTINUE ON 5/4/23*** 5/4/2023 *Job continues from 5-3-23* (Assist slickline) TFS U-3 FWHP's= 900/0/0 Well left in Pollard SLine control upon departure 5/4/2023 ***CONTINUE FROM 5/3/23*** BROACH TIGHT SPOTS IN TBG @ 8945' & 9004' (3.75" drift clean ) RAN HYDROSTATIC & PUMP BAILER TO 4-1/2" PXN PLUG @ 9077' MD (no recovery, no communication) BROACH TIGHT SPOTS UNABLE TO PASS 9004' W/ 3.77 ***CONTINUE ON 5/5/23*** 5/5/2023 ***CONTINUE FROM 5/4/23*** DUMP BAIL OIL SAFE @ 8953' SLM & 9004' SLM ***WELL LEFT SHUT IN ON DEPARTURE*** 5/7/2023 ***WELL SHUT IN ON ARRIVAL*** BROACH TIGHT SPOTS IN TBG W/ 3.77'' & 3.78'' BROACH RAN 3.80'' G-RING TO PXN-PLUG BODY @ 9077'MD PULLED 4-1/2'' PXN-PLUG BODY FROM XN-NIP @ 9077'MD DRIFT & TAG TD 9479'MD Corrected (sample of frac sand recovered, 4' of rathole below btm open perf) ***WELL LEFT S/I ON DEPARTURE*** 5/9/2023 T/I/O= 197/11/-9 (PLUG AND ABANDONMENT) Injectivity test to 3,000 psi. Pumped 5 bbls of 60/40 and 400 bbls of Sea Water to perform injectivity test (see log for details). Freeze protected TBG with 2 bbls of 60/40 and 58 bbls of diesel. Valve Positions - SV/WV/SSV= Closed, MV= Open, IA/OA= OTG FWHPs= -14/27/-3 5/12/2023 Assist w/ Cement Job (PLUG AND ABANDONMNET) Heat DSL tanker to 80*. Pumped the following 5 bbls meth 10 bbls FW spacer 20 bbls 14# class G cement 5 bbls FW spacer Drop 6" foam ball Displace cement w/ 189 bbls warm diesel down the TBG (Est TOC @ ~9090') Grease valves and flush hardline out w/ frz prt ***JOB COMPLETE**** 5/25/2023 T/I/O=90/10/0 MIT-T PASSED to 2716 PSI (PRE STATE TEST) Pumped 8.5 bbls of diesel down TBG to reach a max pressure of 2750 psi. 1st 15-minute loss of 23 psi, 2nd 15-minute loss of 11 psi, for a total loss of 34 psi in 30 minutes. Bled back ~3.7 bbls. Valve Positions - SV/SSV= Closed, MV= Open, IA/OA= OTG FWPs= 27/533/-2 5/26/2023 ***WELL SHUT IN ON ARRIVEL*** RAN KJ, 3' x 1.75" STEM, 3.84" G-RING TAGGED 3.81" X-NIPPLE @8,936' MD DRIFT W/ KJ, 3.25" CENT, 3 x 1.75" STEM, 2.5" S.BAILER MULE SHOE BALL BTM TO 8,974' MD, TO TAG CEMENT ( recovered sample of cement) ***WELL S/I ON DEPARTURE*** DRIFT & TAG TD 9479'MD Corrected 20 bbls 14# class G cement Daily Report of Well Operations PBU 13-01 5/28/2023 ***WELL S/I ON ARRIVEL*** PERFORM AOGCC WITNESSED MIT-T TO 2,741 PSI (pass) PERFORM AOGCC WITNESSED DRIFT TO 8,991' SLM GOOD SAMPLE OF CEMENT ***WELL S/I ON DEPARTURE*** 5/28/2023 T/I/O=285/211/0. (PLUG AND ABANDONMENT) Assist Slickline. State wittness MIT- T by Adam Earl. Pumped 2.6 bbls crude down tbg to reach max pressure 2750 psi. 15 min Loss: 128 psi. 30 min Loss: 41 Psi. Bleed back 2.5 bbls to Starting Pressure. FWHP=283/225/1. Left well in Slicklines control. 5/30/2023 ***WELL S/I ON ARRIVAL*** PUNCH HOLES FROM 8895' - 8900 MD, CCL TO TS=9.5' MD, CCL STOP DEPTH=8885.5' MD, CORRELATED TO TUBING TALLY DATED:9/25/93 GOOD COMMUNICATION AFTER INITIAL SHOCK FROM SHOOTING. T/IA TRACKED WHILE POOH. ***WELL LEFT S/I, READY FOR FULLBORE*** 5/31/2023 T/I/O = SSV/280/10. Temp = SI. Cement C & B lines (pre P&A). No AL. Pumped 2.5 gallons of ultra fine cement down both control & balance lines. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 6/4/2023 T/I/O = SSV/240/10. Temp = SI. PT C&B lines (P&A). Flowline disconnected. C&B lines cemented to surface. Used hydraulic fluid to PT C&B lines to 500 psi (PASS). Final WHPs = SSV/240/10. SV, SSV, MV = C. MV = O. IA, OA = OTG. 00:30 6/27/2023 T/I/O=500/50/5 Assist HAL Cement ( P & A ) LRS Pump 50 bbls diesel down Tbg returns up IA to return tanks to prove communication/inj rate. HAL Cement pumped 80 bbls surfactant flush, 10 bbl freshwater spacer, 500 bbls 14.0 ppg class G cement & 5 bbl freshwater spacer. LRS pumped 48 bbls 9.8# brine & 10 bbls 60/40 to spot cement at surface in IA & 2500' in tbg. Flushed hardline with 10 bbls diesel. FWHPs=900/85/17 **Complete** 7/3/2023 T/I/O = 0 / 0 / 21 MIT - T PASSED 2500 psi pass 2750 psi max applied ( PLUG AND ABANDONMENT ) Pumped 1.4 BBLS of Crude down TBG to reach test pressure 2748 psi. 15 min Loss : 133 psi. 30 min Loss : 72 psi ( FAIL ). Restart Test, Pumped .03 BBLS of Crude to reach test pressure 2769 psi. 15 min Loss : 73 psi. 30 min Loss : 32 psi. ( PASS ) Bled back1.4 BBLS fromTBG to 0 psi. Fullbore notified / DSO notified upon departure FWHP = 0 / 0 / 21 7/7/2023 ***WELL S/I ON ARRIVAL*** TAG CEMENT @2400'SLM W/2.50 DD BAILER PERFORMED PASSING MIT STATE WITNESS BY AUSTIN MCLOUD ***WELL LEFT SHUT IN ON DEPARTURE, PAD OPERATED NOTIFIED*** 7/7/2023 T/I/O=118/0/23 State Witness by Austin Mcloud MIT-T PASSED to 2720 PSI (PLUG AND ABANDONMENT) 2750 psi Max Pressure, 2500 psi Target Pumped 0.25 bbls Crude to reach test pressure. Loss of 70 psi 1st 15 min. Loss of 25 psi 2nd 15 min for a total loss of 95 psi during 30 min test. Tags Hung, S-Line on location upon departure. FWHP=100/0/24 7/10/2023 T/I/O= 0/0/0 Temp= S/I (TFS Unit 4 Assist E-Line with P and A) Pumped 5 bbls of DSL down TBG to Assist E-Line with Perfs. Pressured TBG to 1700 psi after E-Line shot perfs to verify TxOA Comms. E-Line in control of well upon departure. Final WHPS= 0/0/0. PERFORM AOGCC WITNESSED MIT-T TO 2,741 PSI (pass)() PERFORM AOGCC WITNESSED DRIFT TO 8,991' SLM GOOD SAMPLE OF CEMENT j 500 bbls 14.0 ppg class G cement & 5 bbl freshwater spacer. PUNCH HOLES FROM 8895' - 8900 MD to spot cement at surface in IA & 2500' in tbg. Daily Report of Well Operations PBU 13-01 7/10/2023 *WELL SHUT IN ON ARRIVAL* PRESSURE TEST PCE FROM 200LB-2500LB RIH WITH CABLE HEAD / CCL / 7' X 3 1/8" PERFORATING GUN (MAX OAL = 10', MAX OD = 3 1/8) PERF DEPTH=494'-500', CCL OFFSET=3.3', CCL STOP DEPTH=490.7' *WELL LEFT SHUT IN ON DEPARTURE* 8/6/2023 T/I/O=..20/0/27 (PLUG AND ABANDONMENT) Pumped 5 bbls 50/50 methanol down TBG taking returns up OA to surface tank, followed by 25 bbls 140* diesel, followed by 61 bbls water with surfactant, followed by 77 bbls 9.8 lb brine, (pumped extra due to 0.3 bpm losses at 3 BPM). RDMO Flags and tags hung. SV, WV SSV = closed, MV = open, IA = OTG. OA = closed and flagged. FWHP's = 0/0/0 8/16/2023 T/I/O Assist Cementers (Plug and Abandonment) HES cement OA cement to surface. Pump 75bbl surfactant wash and 67.5 bbls of 15.8 class G down OA with returns to surface. Confirm clean cement at surface. Cement in Tubing/OA from surface to 500'. RDMO ***Complete*** 8/28/2023 T/I/O = Cement/ 0/0. ND 7" Tree. Installed 7" bonnet w/ tree cap directly to THA. FWP = Cement/0/0 9/7/2023 T/I/O = Cement/0/30. Temp = P&A. WHP's (check guages). Well is P&A w/ cement. All guages appear to be functioning normaly. No Tree/S-riser, tree scaffold or wellhouse Tree bonnet installed directly to THA. No tree/ IA & OA = OTG. 10:30. 11/25/2023 ** P&A** In progress. Held ACWR PJSM with OPS and sefety. Excavated around wellhead down to ~4' and started to see fluid. All of the contaminated graverl went into a SRT dumpster for disposal. Covered excavation with rig mats and placed baracades to allow ground to freeze. Job in progress. 12/20/2023 **P&A** In progress. Removed rig mats and excavated from 4' down to 7' and ran into liquid. Covered excavation with rig mats add placed barricades. Will return after letting ground freeze. Job In progress. 2/16/2024 *** P&A In Progress***. Lots of snow removal was done to get to well. Removed mats and continue to excavate from 7' down to 12'. cover ered excavation with mats and placed barricades. Job in progress. 2/18/2024 ***P&A In Progress***. Pad elevation=45.6". Tunra elevation= 36.6'. Mark pad grade on wellhead. Removed mats and barricades. While we continued to excavate the hydocarbon oder was getting worse. Called safety out to sample the excavated hole. Benzene was measured at 3.30 ppm . The decision was made to over dig the excavation in depth and backfill with clean gravel. Excavated down to 17' 6" in depth and backfilled with 2' of gravel to midigate the benzene level. Final excavation depth is 15' 6" with tundra at 9' below pad grade. Set shoring box and safety could not detect any levels of benzene. All graver from this excavation was placed in bins supplied by SRT and taken to G&I for disposal. Job In progress. 2/26/2024 ***P&A In Progress***. Pad elevation = 45.6". Tundra elevation = 36.6'. Set hydraulic Wachs Goliath saw 3' 6" below tundra elevation. Cut-off wellhead. Conductor & tubing cemented to surface with good cement. Tubing x production casing annulus has 12' void. Production casing x surface casing annulus has sand/gravel mixture at surface. Remove 12" of material, unable to dig any farther. LDFN. ) PERF DEPTH=494'-500', y Conductor & tubing cemented to surface with good cement. Tubing x production casing annulusgggg has 12' void. Production casing x surface casing annulus has sand/gravel mixture atgg surface. Remove 12" of material, unable to dig any farther. 15.8 class G down OA with returns to surface. Confirm clean cement at surface. Cement in Tubing/OA from surface to 500 Daily Report of Well Operations PBU 13-01 2/27/2024 ***P&A In Progress*** AOGCC Inspector Adam Earl inspected cut-off casing strings and approved of the casing cut depth as well as the plan forward for cement top job. Performed cement top job in TBG x PC annulus with 22 gallons of 15.8 ppg AS-1 cement. Performed cement top job in PC x SC annulus with 3 gallons of 15.8 ppg AS- 1 cement. LDFN. 2/28/2024 ***P&A In Progress*** AOGCC Inspector Adam Earl verified cement top jobs in all annuli and the verbiage on the marker plate. Welded the marker plate to the 20" conductor. WOW to pull the shoring box. LDFN. 3/3/2024 ***P&A Complete*** Pulled the shoring box from the excavation. Covered the excavation with rig mats per Environmental due to contaminated gravel. 2024-0228_Surface_Abandon_PBU_13-01_ae Page 1 of 3 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: 2-28-2024 P. I. Supervisor FROM: Adam Earl SUBJECT: Surface Abandonment Petroleum Inspector PBU 13-01 Hilcorp North Slope, LLC PTD 1780600; Sundry 323-074 2/27/2024: I traveled to PBU 13-01 to inspect the surface abandonment. The well was cut off at 3 feet 6 inches below tundra level. The IA cement was 12 feet down from the cut casing and the OA was about 1 foot down. The conductor and tubing showed cement to surface. 2/28/2024: I returned to PBU 13-01 late afternoon on the 28th to inspect the cement top-off and the marker plate. The well had been topped off with cement and now has set-up cement in all strings. The marker plate had all the correct information welded on and was the correct size. Robert Bryan was the Hilcorp representative on the job. Attachments: Photos (3)      2024-0228_Surface_Abandon_PBU_13-01_ae Page 2 of 3 Surface Abandonment – PBU 13-01 (PTD 1780600) Photos by AOGCC Inspector A. Earl February 27-28, 2024 Cutoff observed 2/27/2024; IA (tubing-casing annulus) and OA (casing-casing annulus) require additional cement. IA void is 12 feet; OA void is 1 foot. 2024-0228_Surface_Abandon_PBU_13-01_ae Page 3 of 3 2/28/2024 – cement to surface in all well spaces MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:14 Township:10N Range:14E Meridian:Umiat Drilling Rig:NA Rig Elevation:NA Total Depth:10055 ft MD Lease No.:ADL 0028315 Operator Rep:Suspend:P&A:X Conductor:20"O.D. Shoe@ 129 Feet Csg Cut@ NA Feet Surface:13-3/8"O.D. Shoe@ 2738 Feet Csg Cut@ NA Feet Intermediate:NA O.D. Shoe@ NA Feet Csg Cut@ NA Feet Production:9-5/8"O.D. Shoe@ 10033 Feet Csg Cut@ NA Feet Scab Liner:7"O.D. Shoe@ 9761 Feet Csg Cut@ NA Feet Tubing:5-1/2"x4-1/2"O.D. Tail@ 9090 Feet Tbg Cut@ NA Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Fullbore Other 8900 ft 2400 ft 7.5ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2720 2650 2625 IA 0 0 0 OA 23 23 24 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Steve Soroka Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): I traveled to location to witness the slickline tag and mechanical integrity test (MITT) of the top cement plug to abandon the well. The tubing was punched at 8895-8900 ft MD (bottom of plug). Proposed top of cement (TOC) in the 5-1/2 inch tubing was 2500 ft MD and cement was brought to surface in the inner annuli. With a 2-1/2 inch bailer slickline string weighing 250 lbs, they tagged the cement at 2400 ft MD (2.3 barrels high) with multiple set downs. Minimal inclination at plug depth. Once out of the hole a cement sample was found in the bailer. I next witnessed a passing MITT to a target of 2500 psi. I found no issues with this inspection. July 7, 2023 Austin McLeod Well Bore Plug & Abandonment Prudhoe Bay Unit 13-01 Hilcorp North Slope LLC PTD 1780600; Sundry 323-074 none Test Data: P Casing Removal: rev. 11-28-18 2023-0707_Plug_Verification_PBU_13-01_am                 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:14 Township:10N Range:14E Meridian:Umiat Drilling Rig:n/a Rig Elevation:n/a Total Depth:10,055 ft MD Lease No.:ADL 0028315 Operator Rep:Suspend:P&A:X Conductor:20"O.D. Shoe@ 129 Feet Csg Cut@ na Feet Surface:13 3/8"O.D. Shoe@ 2738 Feet Csg Cut@ na Feet Intermediate:O.D. Shoe@ Feet Csg Cut@ na Feet Production:9 5/8"O.D. Shoe@ 10033 Feet Csg Cut@ na Feet Liner:7"O.D. Shoe@ 9761 Feet Csg Cut@ na Feet Tubing:5 1/2 x 4 1/2"O.D. Tail@ 9090 Feet Tbg Cut@ na Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Fullbore Bottom 10,055 ft 8,991 ft Wireline tag Initial 15 min 30 min 45 min Result Tubing 2741 2613 2572 IA 358 363 363 OA 0 0 0 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: I traveled to PBU 13-01 to witness a tag and pressure test of the reservoir isolation plug. Pressure test was first and went as shown in chart above. Wireline tag showed top of cement @ 8,991 ft MD. The string consisted of 13 feet of 2-1/8" weight bar, spangs, and a 3-foot bailer (2-1/2 inches OD). Hanging weight showed 240 lbs inside the lubricator. The sample bailer brought back some interface sludge up top and much harder cement at the bottom. May 28, 2023 Adam Earl Well Bore Plug & Abandonment PBU 13-01 Hilcorp North Slope LLC PTD 1780600; Sundry 323-074 none Plugging Data: Test Data: P Casing Removal:Casing/Tubing Data: Caleb Piaskowski rev. 11-28-18 2023-0528_Plug_Verification_PBU_13-01_ae               7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 13-01 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 178-060 50-029-20323-00-00 ADL 0028315 10055 Conductor Surface Production Scab Liner Liner 9519 94 2704 1000 2796 9077 20" 13-3/8" 9-5/8" 7" 8599 35 - 129 34 - 2738 33 - 10033 6965 - 9761 2646 35 - 129 34 - 2738 33 - 9498 6680 - 9239 9423 520 2670 4760 7020 9077 1530 4930 6870 8160 9222 - 9529 5-1/2" 17 # x 4-1/2" # 13Cr80 31 - 90908734 - 9021 Structural 4-1/2" Baker SABL-3 No SSSV Installed 8993 / 8521 2202 / 2201 Date: Bo York Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY 3-1-2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Samantha Carlisle at 9:38 am, Feb 07, 2023 323-074 Digitally signed by Bo York (1248) DN: cn=Bo York (1248), ou=Users Date: 2023.02.03 11:27:09 -09'00' DSR-2/7/23 X DLB 02/07/2023 10-407 * AOGCC to witness slick line tag ( TOC ~9,090' MD and pressure test (to 2500 psi) of reservoir abandonment plug. * AOGCC to confirm TOC in all annuli before welding marker plate. * Photo document TOC in all annuli before welding plate and then with welded plate in place. 2646 MGR08FEB23GCW 02/08/23 JLC 2/8/2023 2/8/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.02.08 15:44:04 -09'00' RBDMS JSB 021423 P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 Well Name:13-01 Permit to Drill:178-060 Current Status:PAL, Not Op API Number:50-029-20323-00 Estimated Start Date:3/1/2023 Estimated Duration:14 days Regulatory Contact:Carrie Janowski First Call Engineer:Oliver Sternicki 907-350-0759 Second Call Engineer:Jerry Lau 907-360-6233 Current Bottom Hole Pressure:3526 psi @ 8,800’ TVD Max. Anticipated Surface Pressure:2646 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:20 psi Min ID:3.725” @ 9077’ MD Max Angle:28 deg @ 6800’ MD Well History: 13-01 was drilled and completed as a producer in December 1978. A workover in August 1990 installed and cemented a 7” scab liner in place as part of a water shut-off and replaced collapsed tubing. Bubbling in the cellar and outside around the wellhouse on 7/24/2006 indicated a possible surface casing leak. The well was secured with a tubing tail plug on 7/24/2006. A failing MIT-OA of 2 BPM @ 500 psi and a leak depth determination confirmed the surface casing leak at an estimated depth of 280-300’ MD in May of 2007. CMIT- TxIA results are mixed since the TTP was set in 2006, one passing test and 2 failing tests at low liquid leak rates. Objectives: The intent of this program is to perform a full P&A of the well per 20 AAC 25.112. We will excavate and cut casings 3’ below the original tundra level and install a marker plate. Procedure: AOGCC Witness: All AOGCC witnessed operations require a minimum of 24-hour notice to AOGCC inspectors of the timing of the operation so they can be available. Fullbore: 1. 10 min MIT-T, CMIT-TxIA to 2000 psi. Verify previously failing CMIT-TxIA tests haven’t gotten substantially worse. MIT-T to verify there isn’t a substantial tubing leak prior to dummying GLVs. Slickline: 1. Pull all GLV stations, Set DGLVs. 2. 10 min MIT-T to 2000 psi to verify DGLVs set. 3. Pull PXN plug from 9077’ MD. 4. Drift to PBTD w/ SB & TEL. Fullbore 1. Pump Injectivity Test, Bullhead into reservoir. x 5 bbls MeOH -00 DLB Superceded starting page 10 P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 x 400 bbls 1% KCL or SW x Freeze protect w/ 58 bbls diesel (only necessary if cementing is not immediately following injectivity test.) x Max pressure 3000 psi 2. Pump Reservoir Abandonment plug, TOC is planned at ~9090’ MD, at the 4 ½” tubing tail. Bullhead into the reservoir as follows: x 5 bbls MeOH x 10 bbls fresh water x 20 bbls 14-15.8 class G cement (6 bbls excess) x 5 bbls freshwater x Foam Ball x 189 bbls warm diesel displacement (75degF) x Max pressure 3000 psi Cement Type/weight:Class G 14-15.8 ppg Bottom hole temp:209°F Fluid Loss:20-200cc/30 min Thickening Time:Minimum 8 hours Cement Volumes: x 7” liner from 9090’ MD to bottom open perforation @ 9475’ MD: 385’ x 0.0371 bpf= 14 bbls Total cement: 14 bbls Displacement: x 5.5” tubing from surface to 6938’ MD: 6938’ x 0.0232= 161 bbls x 4.5” tubing from 6938’ MD to 9090’ MD: 2152’ x 0.0152= 33 bbls Total displacement: 194 bbbls Slickline 1. WOC 3 days, Drift and tag to TOC–AOGCC Witnessed. DHD : 1. Cement control and balance lines. Eline: 1. Punch 4.5” tubing from ~8895-8900 MD. Adjust depth to punch across a tubing collar. See attached tubing tally. A. Use 0° phase, decentralized, oriented to low side, rated for 4.5”, 12.6#, 13-CR-80 tubing. B. Apply 1000 psi to 4.5” prior to perforating, record before/after pressures. C. Note any pressure changes. Fullbore: 1. Rig up to be able to pump down the tubing and take returns from the IA. 2. Pump the following to verify T&I communication. x 5 bbls MeOH mgrPressure test to 2500 psi. - AOGCC to witness. Superceded P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 x 50 bbls diesel x Max pressure while pumping 3000 psi. Fullbore Cement: 1. Pump the following down the tubing, up the IA. Max pressure while pumping= 3000 psi. A. 5 bbls MeOH. B. 75 bbls hot (160degF) fresh water + surfactant. C. 10 bbls fresh water. D. 412 bbls (20 bbls over calculated volume) 14-15.8 ppg Class G cement. E. 5 bbls fresh water. F. Foam ball. G. 124 bbls 9.8 ppg brine. H. 10 bbls 60/40 for freeze protect. I. Confirm cement at surface in IA. a. Cement plug in IA will be from tubing punches to surface. b. Cement in tubing will be from tubing punches to 6000’ MD. Cement Type/weight:Class G 14-15.8 ppg Bottom hole temp:between 80° and 110°F Fluid Loss:20-200cc/30 min Thickening Time:Minimum 8 hours Cement Volumes: x 5.5” tubing from 6000’ MD to 6938’ MD: 938’ x 0.0232= 22 bbls x 4.5” tubing from 6938’ MD to 8900’ MD: 1962’ x 0.0152= 30 bbls x 4.5” x 7” annulus from 6965’ MD to 8900’ MD: 1935’ x 0.0175 bpf= 34 bbls x 4.5” x 9.625” annulus from 6938’ MD to 6965’ MD: 27’ x 0.0535 bpf= 2 bbls x 5.5” x 9.625” annulus from surface to 6938’ MD: 6938’ x 0.0438 bpf= 304 bbls Total cement: 392 bbls Displacement: x 5.5” tubing from surface to 6000’ MD: 6000’ x 0.0232= 139 bbls Total displacement: 139 bbbls Fullbore : 1. Wait on cement 3 days, AOGCC witnessed MIT-T to 2500 psi target pressure. Slickline : 1. Drift and tag to TOC in 5.5” tubing @~6000’ MD- AOGCC witnessed. Well Support: 1. Nipple down tree, install dry hole tree for cementing. Eline: 1. Perforate 5.5” tubing and 9-5/8” casing at 495-500’ MD. 3.125” MaxForce- FLOW or similar. A. Perforate 5.5” tubing and 9-5/8” casing at 495-500’ MD to establish circulation point for cementing. Superceded P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 B. Apply 1000 psi to 5.5” prior to perforating, record before/after pressures. C. Note any pressure changes Fullbore : 1. Confirm circulation through perforation holes. 2. Circulate the following down the tubing and up the 9-5/8”x 13-3/8” annulus to prep for cement. A. 5 bbls MeOH B. 25 bbls hot diesel (min 120 degF) C. 60 bbls hot (160degF) fresh water + surfactant D. 50 bbls (9 bbls excess) of 9.8 brine (80-100 degF) (can skip this freeze protecting step if immediately going to cementing) E. Max pressure 2000 psi. **Be cautious if pumping away and not getting returns at surface due to SC leak at ~300’ MD** 2. If unable to circulate rig up coil for contingent thaw and flush of OA. Coil Tubing Pending: Contingent step if fullbore is unable to get circulation to the OA due to arctic pack. 1. Circulate well with hot seawater to thaw the 9-5/8” x 13-3/8” annulus. 2. Pump the following to flush the arctic pack out of the 9-5/8”x13-3/8” annulus A. 5 bbls MeOH B. 25 bbls hot diesel (min 120 degF) C. 125 bbls hot (160degF) fresh water + surfactant D. Freeze protect with 45 bbls hot diesel (min 120 degF) if not immediately cementing. ¾Max pressure 2000 psi. **Be cautious if pumping away and not getting returns at surface due to SC leak at ~300’ MD** Fullbore Cement: 1. Circulate the following down the tubing to cement the tubing and 9-5/8”x 13-3/8” annulus from surface to 500' MD A. 5 bbls MeOH B. 10 bbls fresh water C. 71 bbls (30 bbls over calculated volume) 14- 15.8 ppg Class G (or Arctic Set) cement or until uncontaminated cement is seen at surface. **Excess volume due to SC leak: 2 bpm @500 psi LLR at a leak depth of 280-300’. D. Max pressure while pumping 2000 psi. E. Top of cement will be at surface in the tubing and 9-5/8”x13-3/8” annulus. Confirm cement at surface in OA. Cement Type/weight:Class G or Arctic Set 14-15.8 ppg Bottom Hole Temp:10°F Fluid Loss:20-200cc/30 min Thickening Time:Minimum 8 hours Cement Volumes: x 5.5” tubing from surface to 500’ MD: 500’ x 0.0232 bpf= 12 bbls x 9..625” x 13.375” annulus from surface to 500’ MD: 500’ x 0.0581 bpf= 29 bbls Total cement: 41 bbls Superceded P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 Displacement: x No displacement DHD: 1. Assist fullbore with cement job and pump N2 across the wellhead to remove excess cement from valves. 2. Bleed all wellhead pressures to 0 psi. 3. Monitor wellhead pressures 24 hours after pressures were bled to 0 psi. Special Projects: 1. Excavate and cut off all casings and wellhead 3’ below original tundra level. 2. AOGCC witness of cut-off casings before any top job commences. 3. AOGCC witness cement tops in all annuli. Top off with cement as needed. 4. Bead weld ¼” thick steel marker cap on outermost casing string. Photo document all steps and AOGCC witness of installed cap. Marker cap to read as follows: Hilcorp North Slope, LLC PTD # 1780600 Well: PBU 13-01 API # 50-029-20323-00 5. Remove shoring box, backfill excavation. 178-060 Superceded P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 Figure 1: Current WBS P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 Figure 2: Proposed P&A WBS Superceded P&A Sundry Well:13-01 PTD:178-060 API:50-029-20323-00 Figure 3: Tubing Tally   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00  WellName:13Ͳ01PermittoDrill:1780600 CurrentStatus:PAL,NotOpAPINumber:50Ͳ029Ͳ20323Ͳ00 EstimatedStartDate:3/1/2023EstimatedDuration:14days RegulatoryContact:CarrieJanowski FirstCallEngineer:OliverSternicki907Ͳ350Ͳ0759 SecondCallEngineer:JerryLau907Ͳ360Ͳ6233  CurrentBottomHolePressure:3526psi@8,800’TVD Max.AnticipatedSurfacePressure:2646psi(Basedon0.1psi/ft.gasgradient) LastSIWHP:20psi  MinID:3.725”@9077’MD MaxAngle:28deg@6800’MD  WellHistory: 13Ͳ01wasdrilledandcompletedasaproducerinDecember1978.AworkoverinAugust1990installedand cementeda7”scablinerinplaceaspartofawatershutͲoffandreplacedcollapsedtubing.Bubblinginthe cellarandoutsidearoundthewellhouseon7/24/2006indicatedapossiblesurfacecasingleak.Thewellwas securedwithatubingtailplugon7/24/2006.AfailingMITͲOAof2BPM@500psiandaleakdepth determinationconfirmedthesurfacecasingleakatanestimateddepthof280Ͳ300’MDinMayof2007.CMITͲ TxIAresultsaremixedsincetheTTPwassetin2006,onepassingtestand2failingtestsatlowliquidleakrates.  Objectives: TheintentofthisprogramistoperformafullP&Aofthewellper20AAC25.112.Wewillexcavateandcut casings3’belowtheoriginaltundralevelandinstallamarkerplate.  Procedure: AOGCCWitness:AllAOGCCwitnessedoperationsrequireaminimumof24ͲhournoticetoAOGCCinspectorsof thetimingoftheoperationsotheycanbeavailable.  Fullbore: 1. 10minMITͲT,CMITͲTxIAto2000psi.VerifypreviouslyfailingCMITͲTxIAtestshaven’tgotten substantiallyworse.MITͲTtoverifythereisn’tasubstantialtubingleakpriortodummyingGLVs.  Slickline: 1. PullallGLVstations,SetDGLVs.  2. 10minMITͲTto2000psitoverifyDGLVsset. 3. PullPXNplugfrom9077’MD. 4. DrifttoPBTDw/SB&TEL.  Fullbore 1. PumpInjectivityTest,Bullheadintoreservoir. x 5bblsMeOH   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00 x 400bbls1%KCLorSW x Freezeprotectw/58bblsdiesel(onlynecessaryifcementingisnotimmediatelyfollowing injectivitytest.) x Maxpressure3000psi  2. PumpReservoirAbandonmentplug,TOCisplannedat~9090’MD,atthe4½”tubingtail.Bullhead intothereservoirasfollows: x 5bblsMeOH x 10bblsfreshwater x 20bbls14Ͳ15.8classGcement(6bblsexcess) x 5bblsfreshwater x FoamBall x 189bblswarmdieseldisplacement(75degF) x Maxpressure3000psi  Cement Type/weight: Class G 14-15.8 ppg Bottom hole temp: 209°F Fluid Loss: 20-200cc/30 min Thickening Time: Minimum 8 hours  CementVolumes: x 7”linerfrom9090’MDtobottomopenperforation@9475’MD:385’x0.0371bpf=14bbls Totalcement:14bbls  Displacement: x 5.5”tubingfromsurfaceto6938’MD:6938’x0.0232=161bbls x 4.5”tubingfrom6938’MDto9090’MD:2152’x0.0152=33bbls Totaldisplacement:194bbbls  Fullbore 1. WOC3days,MITͲTto2500psitargetpressure–AOGCCWitnessed.  Slickline 1. DriftandtagtoTOC–AOGCCWitnessed.  DHD: 1. Cementcontrolandbalancelines.  Eline: 1. Punch4.5”tubingfrom~8895Ͳ8900MD.Adjustdepthtopunchacrossatubingcollar.Seeattached tubingtally. A. Use0°phase,decentralized,orientedtolowside,ratedfor4.5”,12.6#,13ͲCRͲ80tubing. B. Apply1000psito4.5”priortoperforating,recordbefore/afterpressures. C. Noteanypressurechanges.  Fullbore:   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00 1. RiguptobeabletopumpdownthetubingandtakereturnsfromtheIA. 2. PumpthefollowingtoverifyT&Icommunication. x 5bblsMeOH x 50bblsdiesel x Maxpressurewhilepumping3000psi.  FullboreCement: 1. Pumpthefollowingdownthetubing,uptheIA.Maxpressurewhilepumping=3000psi. A. 5bblsMeOH. B. 75bblshot(160degF)freshwater+surfactant. C. 10bblsfreshwater. D. 493bbls(20bblsovercalculatedvolume)14Ͳ15.8ppgClassGcement. E. 5bblsfreshwater. F. Foamball. G. 43bbls9.8ppgbrine. H. 10bbls60/40forfreezeprotect. I. ConfirmcementatsurfaceinIA. a. CementpluginIAwillbefromtubingpunchestosurface. b. Cementintubingwillbefromtubingpunchesto~2500’MD.  Cement Type/weight: Class G 14-15.8 ppg Bottom hole temp: between 80° and 110°F Fluid Loss: 20-200cc/30 min Thickening Time: Minimum 8 hours  CementVolumes: x 5.5”tubingfrom2500’MDto6938’MD:4438’x0.0232=103bbls x 4.5”tubingfrom6938’MDto8900’MD:1962’x0.0152=30bbls x 4.5”x7”annulusfrom6965’MDto8900’MD:1935’x0.0175bpf=34bbls x 4.5”x9.625”annulusfrom6938’MDto6965’MD:27’x0.0535bpf=2bbls x 5.5”x9.625”annulusfromsurfaceto6938’MD:6938’x0.0438bpf=304bbls Totalcement:473bbls  Displacement: x 5.5”tubingfromsurfaceto2500’MD:2500’x0.0232=58bbls Totaldisplacement:58bbbls  Fullbore: 1. Waitoncement3days,AOGCCwitnessedMITͲTto2500psitargetpressure.  Slickline: 1. DriftandtagtoTOCin5.5”tubing@~2500’MDͲAOGCCwitnessed.  WellSupport: 1. Nippledowntree,installdryholetreeforcementing.  Eline:   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00 1. Perforate5.5”tubingand9Ͳ5/8”casingat495Ͳ500’MD.3.125”MaxForceͲFLOWorsimilar. A. Perforate5.5”tubingand9Ͳ5/8”casingat495Ͳ500’MDtoestablishcirculationpointfor cementing. B. Apply1000psito5.5”priortoperforating,recordbefore/afterpressures. C. Noteanypressurechanges  Fullbore: 1. Confirmcirculationthroughperforationholes. 2. Circulatethefollowingdownthetubingandupthe9Ͳ5/8”x13Ͳ3/8”annulustoprepforcement. A. 5bblsMeOH B. 25bblshotdiesel(min120degF) C. 60bblshot(160degF)freshwater+surfactant D. 50bbls(9bblsexcess)of9.8brine(80Ͳ100degF)(canskipthisfreezeprotectingstepif immediatelygoingtocementing) E. Maxpressure2000psi.**Becautiousifpumpingawayandnotgettingreturnsatsurfacedue toSCleakat~300’MD** 2. IfunabletocirculaterigupcoilforcontingentthawandflushofOA.  CoilTubingPending:ContingentstepiffullboreisunabletogetcirculationtotheOAduetoarcticpack. 1. Circulatewellwithhotseawatertothawthe9Ͳ5/8”x13Ͳ3/8”annulus. 2. Pumpthefollowingtoflushthearcticpackoutofthe9Ͳ5/8”x13Ͳ3/8”annulus A. 5bblsMeOH B. 25bblshotdiesel(min120degF) C. 125bblshot(160degF)freshwater+surfactant D. Freezeprotectwith45bblshotdiesel(min120degF)ifnotimmediatelycementing. ¾ Maxpressure2000psi.**Becautiousifpumpingawayandnotgettingreturnsat surfaceduetoSCleakat~300’MD**  FullboreCement: 1. Circulatethefollowingdownthetubingtocementthetubingand9Ͳ5/8”x13Ͳ3/8”annulusfrom surfaceto500'MD A. 5bblsMeOH B. 10bblsfreshwater C. 71bbls(30bblsovercalculatedvolume)14Ͳ15.8ppgClassG(orArcticSet)cementoruntil uncontaminatedcementisseenatsurface.**ExcessvolumeduetoSCleak:2bpm@500psi LLRataleakdepthof280Ͳ300’. D. Maxpressurewhilepumping2000psi. E. Topofcementwillbeatsurfaceinthetubingand9Ͳ5/8”x13Ͳ3/8”annulus.Confirmcementat surfaceinOA.  Cement Type/weight: Class G or Arctic Set 14-15.8 ppg Bottom Hole Temp: 10°F Fluid Loss: 20-200cc/30 min Thickening Time: Minimum 8 hours  CementVolumes: x 5.5”tubingfromsurfaceto500’MD:500’x0.0232bpf=12bbls   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00 x 9..625”x13.375”annulusfromsurfaceto500’MD:500’x0.0581bpf=29bbls Totalcement:41bbls  Displacement: x Nodisplacement  DHD: 1. AssistfullborewithcementjobandpumpN2acrossthewellheadtoremoveexcesscementfrom valves. 2. Bleedallwellheadpressuresto0psi. 3. Monitorwellheadpressures24hoursafterpressureswerebledto0psi.  SpecialProjects: 1. Excavateandcutoffallcasingsandwellhead3’beloworiginaltundralevel. 2. AOGCCwitnessofcutͲoffcasingsbeforeanytopjobcommences. 3. AOGCCwitnesscementtopsinallannuli.Topoffwithcementasneeded. 4. Beadweld¼”thicksteelmarkercaponoutermostcasingstring.PhotodocumentallstepsandAOGCC witnessofinstalledcap.Markercaptoreadasfollows: Hilcorp North Slope, LLC PTD # 1780600 Well: PBU 13-01 API # 50-029-20323-00 5. Removeshoringbox,backfillexcavation.  mgr178-060   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00  Figure1:CurrentWBS    P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00  Figure2:ProposedP&AWBS   P&ASundry Well:13Ͳ01 PTD:1780600 API:50Ͳ029Ͳ20323Ͳ00   Figure3:TubingTally . RECEIVED STATE OF ALASKA I ALASKA OIL AND GAS CONSERVATION COM SSION SEP 2 7 2006 REPORT OF SUNDRY WELL OPERA TIÐN8)j & Gas Cons. Commission 1. Operations Performed: 1:. Abandon 0 Repair Well 0 Plu : Perforations 0 Stimulate 0 OtherlXJSecure Well Alter Casing 0 Pull TubingD Perforate New PoolO WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate 0 Re-enter Suspended WellD 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development 00 ExploratoryD 17a..o600 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 StratigraphicO ServiceD 50-029-20323-00-00 7. KB Elevation (ft): 9. Well Name and Number: 74.00 13-01 8. Property Designation: 10. Field/Pool(s): ADL-028315 Prudhoe Bay Field I Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 10058 feet true vertical 9521.0 feet Plugs (measured) Secured Well --- 4-112" TTP @ 9077' (07/2512006) Effective Depth measured 9715 feet true vertical 9196.0 feet Junk (measured) Fish @ 9423-- IBP Elements (0711011993) Casing Length Size MD TVD Burst Collapse CONDUCTOR 94 20" 94# H-40 35 - 129 35.0 - 129.0 1530 520 SURFACE 2704 13-3/8" 72# N-80 34 - 2738 34.0 - 2738.0 4930 2670 PRODUCTION I 10000 9-5/8" 47# N-80 33 - 33.0 - 6870 4760 PRODUCTION 9-5/8" 47# SOO-95 - 10033 9498.0 8150 5080 SCAB LINER 2796 7" 29# L-80 6965 - 9761 6680.0 - 9239.0 8160 7020 Perforation depth: Measured depth: 9360-9415,9435-9475 f'"'f',y~)I"~.fJ) '¿ True vertical depth: 8862-8914,8933-8970 ~~~;....\J;\.:¡"'\oi:" . Tubing ( size, grade, and measured depth): 5-1/2" 17# 13Cr80 @ 31 - 6938 4-112" 12.6# 13CR80 @ 6938 - 9090 Packers & SSSV (type & measured depth): 7" Baker SABL-3 Packer @ 89,*3 5-112" Cam BAL-O SSSV Nip @ 2201 12. Stimulation or cement squeeze summary: RBDMS BFt 0 CT 0 :1 2DDô Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Representative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: SI 0 0 -- 150 Subsequent to operation: SI 0 0 -- -- 14. Attachments: 15. Well Class after proposed work: ExploratoryD Development[!] ServiceD Copies of Logs and Surveys run _ 16. Well Status after proposed work: Daily Report of Well Operations _ ~ oilŒ GasD WAG 0 GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact DeWayne R. Schnorr N/A Printed Name DeWayne R. Schnorr Title Petroleum Engineer AI ./ . æ_Y..-f. Signature ~ ~ ~.A _ Phone 564-5174 Date 9/22/06 Form 10-404 Revised 4/2004 C RIGINAL . . 13-01 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 08/05/2006 T/IIO = 0/0/0 CMIT T x IA (FAILED) (Eval Secure bubbling in cellar) CMIT Tx fA pressured up to 2300/2500 with 98.5 bbls crude. First test Tlllost 75/100 psi in 15 minutes and 75/100 psi 2nd 15 minutes. Monitored for 15 additional minutes. Tlllost 75/60 psi in 3 rd 15 minutes. For a total of 225/260 psi in 45 minutes. Second test pumped up to 2320/2500 psi with.7 bbls crude. Tlllost 45/60 psi in 15 minutes and 75/60 psi 2nd 15 minutes. Monitored for additional 15 minutes. T/llost 50/60 psi 3rd 15 minutes. For a total T/llost 170/180 psi in 45 minutes. Third test pumped up to 2325/2500 with .6 bbls crude. T/llost 25/50 in 15 minutes and 50/50 in 2nd 15 minutes. For a total of 75/100 in 30 minutes. Bleed pressure down. FWHP's=O/O/O 08/05/2006 T/I/O = 0/0/0 Load IA (PRE CMIT TxIA) Pumped 23 bbls of neat methanol followed by 256 bbls of crude. Pumped with centrifugal pump entire job. Final WHP's = 0/0/0 08/02/2006 T/I/O= 1/1/9. Temp= SI. WHP's, IA & OA FL (Eval OAP). TP increased .5 psi, lAP unchanged and OAP increased 6 psi overnight. IA FL @ 6915' (302.9 bbfs). OA FL @ 24' (1.4 bbls). IA has an integral flange. 07/31/2006 TII/O = 0.5/1/3. Temp = S/I. WHPs, IA & OA FL. (eval OAP). TBGP and lAP unchanged, OAP up 0.5 psi overnight. IA & OA FL unchanged overnight. No sign of gas bubbling or leaking in cellar or around wellhouse. 07/30/2006 TII/O = 0+/1/2.5. Temp = SII. WHPs, IA & OA FL (eval OAP). TBGP unchanged overnight, lAP up 1 psi, OAP up 2.5 psi. IA FL @ 36' «1 bbL). OA FL @ 36' (5 bbLs). No sign of gas bubbling or leaking in cellar or around wellhouse. 07/29/2006 TIO = 46/5/13. Temp = SI. Bleed WHPs to 0 psi (eval OAP). Bled OAP from 13 psi to 0 psi (all gas) in 5 mins. Bled TBGP from 46 psi (all gas) to 0 psi in 1.25 hrs. Bled lAP from 5 psi to 0+ psi (all gas) in 20 mins. FWHPs = 0/0+/0. 07/28/2006 TII/O= 47/6/12. Temp= SI. Monitor bubbling, IA & OA FL's (Eval OAP repressurization) day 3 of 3. TP increased 4 psi, lAP and OAP are unchanged overnight. IA & OA FL's unchanged. No bubbling present in cellar at this time. 0% LEL in the cellar and the holes outside the well house. However the cellar is oxygen defficient (19.4% on the gas meter). ***NOTE*** Small sink holes outside of well house are marked with cones. 07/27/2006 TII/O=43/6/12. Temp=SI. Monitor bubbling, IA & OA FL's. (Eval OA repressurization). TP decreased 7 psi overnight. lAP increased 1 psi overnight. OAP decreased 3 psi overnight. IA FL @ 36' «2 bbl). OA FL @ 36' «3 bbf). No bubbling present in cellar at this time. ***Note*** Small sink holes outside of well house marked by cones. 07/26/2006 TII/O= 50/5/15. Temp= SI. Monitor bubbling (Eval OAP repressurization). TP increased 20 psi and OAP increased 5 psi overnight. No sign of bubbling or gas leaking in cellar or holes outside of well house. IA has a 3" integral flange. Holes outside of well house are marked with cones. 07/25/2006 TII/O=30/5/10. Temp=SI. Monitor Bubblin in cellar. No bubbling in cellar at this time. TBP increased 30 psi over night. lAP increased 5 psi, OAP increased 10 psi over night. Flagged off area around the hole in the ground outside of the well house. Page 1 . . 13-01 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 07/24/2006 TII/O=620/10/100. Tenp=SI. Monitor Bubblin in cellar. TBG FL @ 3573'. IA FL @ 6832'. OA FL @ 192'. LELs still coming from hole outside of the wellhouse (70%). No bubbling in cellar at this time. Bled TBGP to 0 psi in 2.5 hrs. Bled lAP & OAP to psi in 30 mins. SI and monitor for 1 hr, no change in pressures. Flow line is SI @ wing valve with 1260 psi on it. Final WHPs 0/0/0. 07/24/2006 DRIFT W/ 3.805 TAG XN 9071' SLM SET PXN PLUG @ 9071' SLM SET PRONG W/ 1.75" FN & 96" OAL @ 9062' SLM ***GIVE WELL BACK TO DSO, LEFT SI*** 07/24/2006 PMD: DRIFT W/ 3.805 TAG XN 9071' SLM. SET PXN PLUG @ 9071' SLM. SET PRONG W/ 1.75" FN & 96" OAL @ 9062' SLM. ***GIVE WELL BACK TO DSO, LEFT SI*** 07/23/2006 TII/O=9500/80/130. Temp=SI. Monitor Bubbling in cellar, OA FL. TBGP decreased 30 psi. TBG FL @ 3825'. lAP increased 80 psi over night. IA FL @ 6900'. OA FL @ 252'. Bled OAP to 0 psi in 1 hr. Bled lAP to 0 psi in 1 hr. Monitored LEL's (OL on gas meter) coming from the hole out side of the well house where bubbling occured on 7-21-06. No LEL's in cellar at this time. Final WHPs 850/0/0. FLUIDS PUMPED BBLS 23 Neat Methanol 356 Crude 379 TOTAL Page 2 TREE = WELLHEAD = ACTIJA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum lVD = FMC FMC AXELSON 74' ? 3100' 28 @ 7000' 9372' 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12.347" I 2738' Minimum ID = 3.725" @ 9077' 4-1/2" SWN NO-GO NIPPLE 15-1/2" TBG, 17#, 13-CR-80, .0232 bpf, 10 = 4.892" I TOPOF 4-1/2" TBG I TOPOF7" LNR- SCAB 1 14-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" ÆRFORA TION SUMMARY REF LOG: BHCS ON 11/23/78 ANGLEATTOPÆRF: 21 @ 9360' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 9222 - 9240 S 08/22/90 3-3/8" 9326 - 9350 S 08/22/90 3-3/8" 4 9360 - 9415 C 08/26/90 3-3/8" 4 9435 - 9475 C 08/26/90 3-3/8" 9491 - 9529 S 08/22/90 I PBTDI 9715' 17" LNR - SCAB, 29#, L-80, .0371 bpf, 10 = 6.184" 1 DATE 12/02/78 09/28/93 01/31/02 08/29/03 08/20/05 05/31/06 9761' 9-5/8" CSG, 47#, N-80, ID = 8.681" I 10033' REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOVER R/lVTP CORRECTIONS KClTLH WAIVER SAFETY NOTE RPHlTLH WAIVER SFTY NOTE DELETED DTM WELLHEA D CORRECTION 13-01 . 9090' DA TE REV BY COMMENTS 07/25/06 DFR/PJC SET PXN PLUG @ 9077 TE5: .....4-1/2.. & 5-1/2" CHROMETBG..... 2201' -/5-1/2" CAMCO BAL-O SSSV NIP, ID = 4.56" GAS LIFT MANDRELS ST MD lVD DEV 1YÆ VLV LATCH PORT DATE 1 2983 2983 4 SA'v1 RK 2 5085 4983 21 SA'v1 RK 3 6798 6532 28 SA'v1 RK 4 6915 6636 28 SA'v1 RK 6938' - 5-1/2" X 4-1/2" XO I -f4-1/2" PARKER SWS NIP, ID = 3.813" - 7" X 4-1/2" BAKER SABL-3 A<R I --14-1/2" PARKER SWS NIP, 10 = 3.813" - 4-1/2" PARKER SWN NO-GO NIP, ID = 3.725" --14-112" PXN PLUG (07/25/06) I 9090' 9087' - 4-1/2" TUBING TAIL I H ELMD TT LOGGED 08/18/98 9423' - (2) 2-1/2" X 7" IBP ELEMENTS (LOST 07/10/93) I PRUDHOE BA Y UNIT WELL: 13-01 PERMIT No: '1780600 API No: 50-029-20323-00 SEC 14 T10N R14E 1749.92 FEL 999.05 FNL BP Exploration (Alaska) 13-01 (PTD #1780600) Internal Waiver Cancellation , ) " ' Subject: 13-01 (PTD #1780600)"temal Waiver Cancellation From: "Dube, Anna T" <Anna.Dube@BP .com> ~ Já( ~\z-z.\ ~6 Date: Fri, 12 Aug 2005 13:33:58 -0800 ~'R '(l To: "AOGCC - Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us>. j im _ regg@admin.state.ak. us CC: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>, "Holt, Ryan P (VECO)" <Ryan.Holt@BP.com> Winton and Jim, The internal BP waiver for IAxOA communication on well 13-01 (PTO #1780600) has been cancelled. The well has passed an OA repressure test proving there is no IAxOA communication. Internal approval has been obtained to return the well to normal status with operating limits of 2000 psi on the IA and 1000 psi on the OA. Please let me know if you have any questions. Thank you, )I nna ( )u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659..5102 Pager: (907) 659-5100 x1154 f''' \C It" (.)1 L fJ D ~ì I .:~) L .t" {Í';~r 1 of 1 8/22/2005 4:04 PM GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 9566 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 7/11/95 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 3-22 ~ I~Z~ PERF RECORD 950618 1 1' ID.S. 3-24 ~ ~ ~ ~ IBP S~NG RECORD 950621 1 1 'D.S. 4-48 ~ C [ ~ ~ ~ PROD PRORLE 950622 1 ....... ~. D,S. 6-14A ~ 3 _ ~ PROD LOG 950623 1 ~ .. 'D.S. 7-06 ~'~ J~' ~RFRE~D 950~ 9 I 1 ~D.S. 9'~ ~ ~' ~RFRE~D 950620 I 1 D.S. 12-34 ~t I , ~ ~ J~ELRYLOGCOL~RLOCAT0R 950619 1 1 ID.s. 12-34 I -~ [ ~ ( ~RFRE~D 950619 I ....... !,.. ID.s: 13-1 ~ ~ G O BAKER INF~T BRIDGE PLUG 950623 I 1 D.S. 17-05 T~ ~ ~ IBP S~NG RECORD 950618 I 1 .... ...... ........... : ........... : , ,, ,, SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED ~ . DATE: 1 1995 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. P.O~ 100360 Anchorage, Ahska 99510 DATE: 10-8-93 77- ~'7 1-11 ~-?~_~___~-6 ~ ZL_.2-12 76~- ~'~4-15 ~4-~9 ~-4~ ~-~7 ~~-21 -21 -2~ ~- ~7 ~-2~ v&-c~-7-8 7~~-9 ~TH ~ ] 1-25 ~: · l-Z8 ~3-1 ~4-~4 e~15-3o ~6-7 ~17-~1 8-29-93 Prod Proflle/~~~ Run 1, 5" 8-29-93 Prod Proflle/~-aai~~ Run 1, 5" ~10~-l~0Sch 8-29-93 ~od ~offie (~lwa~~~~ 5" 9-7-93 ~j ~offie & S~flc/~o~'~~ 5" ~~Sch 9-7-93 ~j ~offie & S~flC]~'n}T~~ 5"~o~~ch 9-3-93 ~B~t~P ~~R-n LS" ~- Scht~o 9-8-93 ~j ~o~e A S~c p~,~l~~,, w~-a,~ Sch 9-3-93 ~ B~t T~P R~ 1, 5"~~ Sch 9-4-93 Pe~ Record l~-~o~ R~ 1, 5" Sch 9-4-93 Peff Record ~-~ R~. 1, 5" Sch 9-10-93 ~ucflon~al~]~e R~ 1, 1"&5' ~ Sch~;~ 8-31-93 USIT (Cement) Color R-- 1, 5"~ ~Z~~chl~ 8-31-93 USIT (~sion) ~lor R~m 1, 5"t~t~ Sch 9-2-93 ~ B~t ~ R~ 1, 5"~~-- Sch~%5 9-10-93 ~od ~offie~[i~~ R~ 1, 5'~ Sch 8-29-93 ~od ~offiel~iT~~ R~m 1, 5" ~o~ Sch 9-5-93 . C~ t~ ~l~~ R~ 1, 5" Sch 9-12-93 ~P ~%~ R~ 2, 5" Sch 8-30-93 ~ Detectl~l~ R~ 1, 2" 100-~ Sch 9-10-93 Pe~ Record ~ zz~-i~ R~m 1, 5" Sch 9-3-93 GR/CCL (TCP ~e-~) R~ 1, 5" 9-5-93 ~ ~[~al~l~/~ R~ 1, 1"&5" 9-7-93 ~ ~ ~- ~ R~ 1, 1"&5" Sch 9-4-93 Pe~ Record ~a~o R~ 1, 5" Sch RECEIVED BY___~~~-~ Have A Nice Dayi Sonya W~!!~ce ATO-1529 # CENTRAL FILES # CHEVRON # CLINT CHAPMAN # EXXON # MOBIL the attached copy as receipt of data. APPROVED__~__ Trans# 93109 # PHILLIPS PB WELL FH,F~ # BPX # STATE OF ALASKA The correct top logged interval for this log is 12,900 feet. The correct top logged interval for this log is 10,400 feet. zl ARCO Alaska~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 8-10-93 REFERENCE: ~~-24A 1-30 ~-30 ~ ~4-1 ~4-40 97_~_.~ 9-13 -26 -42 1-12 1-18 1-22 3-1 7-1~ ~7-19 7-14-93 7-5-93 7-11-93 7-17-93 7-17-93 7-10-93 7-6-93 7-6-93 7-8-93 7-11-93 7-3-93 7-3-93 7-9-93 7-4-93 7-4-93 7-8-93 7-2-93 7-16-93 7-16-93 7-5-93 7-6-93 7-9-93 7-13-93 7-12-93 Completion Record ~9~~,°5" Perf Record ~)0~zi5 R~m 1, 5" InJ Profile ~ ~o-~o~ Run 1, 5' Perf Record ~>-~-~zr~ Run 1, 5" Prod Profile ~o-~% Run 1, 5" Production Log ~f_]Run 1, PITS/InJ Profilea~w~R~m 1, 5" Sch Sch Sch Sch Sch Sch Sch Production Log~°-~OS°Ru_n 1, 1"&5" 8ch Completion Record Rrm 1, 5"~"~s~$Sch Perf Record ~r~~n~ Run 1, 5" Sch Peri' Record )~- t~ ~ R~ln 1, Pe~ Record%~~ R,m 1, ~ ~tect ~-~ R~m 1, ~mpleflon Record R~m 1, ~ ~tect R~m 1, ~ ~ct ~5~o Run 1, 2'&5' ~h ~ml Brat ~ R~m 1, 5"~-%~h Peff Record J~- Iz~5l R~m 1, 5" Sch ~e-~ ~g- ~P io~%~b~ 1, 5" Sch ~ ~tect ~-%~o R~ 1, 2" Sch Peff Record ~~~ R~ 1, 5' Sch ~J ~~/~ ~c R~m 1, 5'~s~-~o~Z~h Pe~ Record ~10~ I R~ 1, 5" Sch ~ ~tect ~_ tot~ R~m 1, 2" Sch 5" Sch 5" Sch 5" q~9_qo:t~Sch 5" ~Sch 2" o- cto~ Sch Please sign and return the attached copy ~s receipt of data. ......... Have A Nice Day! Sonya Wallace APPROVED ATO- 1529 Trans# 93081. # CENTRAL FILES # PHILLIPS # CHEVRON # CLINT CHAPMAN # BPX # EXXON # STATE OF ALASKA # MOBIL * The correct top logged interval for 11-22 is 380 feet. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-20-93 REFERENCE: ARCO CASED HOLE FINALS ~/ * 1-1B~1~°~6-20-93 Prod Profile 1-16 ~'°~.u 6-25-93 Perf Record 1-22 iv~ ,~ 6-29-93 Production Log 1-30 ~' ~ ~_~ 6-29-93 Leak Detect 3-25A ~TM 6-27-93 Perf Record 3-30 ~~ 6-23-93 3-31 ~-~6-23-93 3-33 ¢¥-~o 6-29-93 3-36 ~-~ 6-28-93 4-37 ~/~? 6-20-93 4-40 ~ l~ 1~6-20-93 5-3A ~f 6-18-93 5-26 ~q~ ~ 6-25-93 6-4 ?~- ~z~-6-26-93 6-13 ~0 -3~ 6-25-93 9-49 ~ ~-~3~ 6-22-93 9-50 ~':~ 6-26-93 12-26e~ 6-22-93' 13-17 lr~ ~ 6-27-93 13-14 ?~-~ 6-28-93 13-20 ~-~? 6-19-93 16-12 ~-~ 6-21-93 17-20 ~'~:~6-26-93 '?~%AGI-6 ~ ~.o~ 4-25-93 AGI-8 ~ ~- ~ ~ 6-19-93' '" AGI-10 ~i ~$~ 6-18-93 *** AGI-10-~6-18-93 Leak Detect Bridge Plug Setting Completion Record Perf Record Dual Burst TDTP (Borax) Completion Record SBT/C /CCL TDTP (Borax) Production Log Perf Record ProdUction Log .Production LOg CNL Leak Detect Leak Detect Plug Depth Record Prod Profile Production Log ; ousticCBT Perf Record Perf Record Run 1, 5" Run 1, 5" R.n 1, 5" Run 1, 5" Run 1, 5" Run 1, 2"&5" R-~ 1, 5" Rim 1, 5" Rim 1, 5" Run 1, 5" R~m 1, 5" R-~ 1, 5" Run 1, 5" R._n 1, 5" Run 1, 5" R.n 1, l"&5" Run 1, 2"&5" Run 1, 5" Run 1, 2" Run 1, 2" Run 1, 5" Run 1, 1"&5" Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Run 1, 5" Please sign and return the attached .c~epF. as receipt of data. RECEIVED B _~~ Have A Nice Day~// Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Aths Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch APPROVED Trans# 93074 # BPX # STATE OF AIAS~ The correct name for this log is l-lB. This is a revised log, please ~ previous copy received. The correct APl# for AGI-10 is 50-029-22353-00. RECEIVED mm,urn 'JUL 0 199 # CLINT CHAPMAN EXXONMoBiL N85~.~ 0il & Gas Cons. Co~is, ion AnChorage £' STATE OF ALASKA (' 0 ~ !G ALASKAt..- AND GAS CONSERVATION CO,,,MlSSlON ' REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator 5. Type of Well 6. Datum of elevation(DF or KB) Development X 74 RKB feet ARCO Alaska, Inc. Exploratory ~ 3. Address Straligraphic 7. Unit or Property P.O. Box 100360, Anchorage, AK 99510-0360 set,ce __ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2290' S, 56' W of SE cr, Sec. 14, T10N, R14E, UM 13-1 At top of productive interval 9. Permit number/approval number 1316' S, 1783' W of NE er, Sec. 14, T10N, R14E, UM E ¢ E IV E D 78-60/90-695 At effective depth 10. APl number 50 - 029-20323 At total depth FEB- 1 9 '~99'~ 11. Field/Pool 1097' S, 1890' W of NE cr, Sec. 14, T10N, R14E, Ul~Ja$~a 0jJ .& Gas Cons. Commission Prudhoe Bay Oil Pool 12. Present well condition summary /~JlCll01'ag8 Total depth: measured 10055 feet Plugs(measured) true vertical 9511 feet Effective depth: measured 9985 feet true vertical 9444 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 129' 20" 167 sx AS II 129' 129' Surface 2664' 13-3/8" 6900 sx AS II 2738' 2737' Production 9959' 9-5/8" 1250 sx Cl 'G' & 300 sx AS I 10033' 9497' Scab Liner 2796' 7" 466 sx CI 'G' 9761' 9231' Perforation depth: measured 9360-9415'; 9435-9475' true vertical 8862-8914'; 8933-8970' Tubing (size, grade, and measured depth) 5-1/2", 17#, IPCT @ 6896' MD; 3-1/2", 9.3#, N-80, IPCT tail @ 9098' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2220' MD; Baker FB-1 packer @ 8997' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Reoresentative Daily Averaoe Production or In!e~ti~n Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1114 1428 1258 -- 250 Subsequent to operation 4811 8648 6651 -- 314 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas __ Suspended .... Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date Form 10-404 Rev 06/15/88 618 LBL c: J. Gruber, ATO-1478 SUBMIT IN DUPLICATE~~ DS 13-01 DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF ZONE 4 10/20/90: MIRU & PT to 9000 psi. Pumped a Propped Fracture treatment through perforations at: 9360 - 9415' MD (Z4) Ref. Log: BHC$ 11/23/78. 9435- 9475' MD (Z4) Pumped: a) 300 bbls 40# Gelled Pre Pad, @ 60 bpm, followed by b) Shutdown. ISlP @ 1304. Resumed pumping: c) 5500 bbls 50# Crosslinked Pad, @ 55-60 bpm, followed by d) 2075 bbls Slurry w/proppant concentrations @ 0-12 ppg, followed by, e) 185 bbls Flush, followed by f) Shutdown. Placed a total of 500,700 lbs of proppant into the formation. Rigged down. 10/25/90: Performed a proppant fill cleanout to 9694' MD. Flowed well. I I/3/90: Performed another proppant fill cleanout to 9698' MD. Flowed well. 12/7/90: Pumped a Scale Inhibition treatment. Returned well to production and obtained a valid welltest. RECEIVED FEB 1 9 1991 J & Gas'Cons, C0mmissJoa {.~horage DATE ' i C,-i 7-90 REFI--RENCE' ARCO CASED HOLE FiNAL. i: i --";'=' '..--' ~.- ~;-:',TM!) f;'i ~i,..i ~ ~::...~ ." ..:* · -..* .. _.,:! 4-! ':?-i ,:"+--'7',:.:.:, F:'RODUCTIOi'~: F'ROF]'!_E RUN i , i? ".'-"',~::.:-" a :..-.:. ~-' i .a ~;:-, Gl:;.'. :,.':UF:VEY F;.'iiN i, 5'." 4 ::2 9 i6-9;:; '",~.q;-,~F'",' '-'Pr'tFIL~: F.-.'.UN ~, ~." · - - . ..... ,.,_ ~., ...... ION r. ..... :'" .... '" 9- 2 'i --- 9 ;--; i::' E ~;' F [4.:E C 0 R '0 F..' U N i .5: '~' :i-, - 'i 2 ? - 2 ~: .- ? :::,, ,~:~ R 0 D U C: '¥' i ~"~._. ,-~'-.): P, ,.:~'" O. F I L. E R U .';'J. i , ~.?, ' · :'i- -- q S 9- c,:._ i .... ? C:: F:' E R )::', n,,: ,_,::' ,.:,-: :..,.,"~ ,n': 'ih..: F.'.~:.:~ J"-.).. '~ ~5:" 4-2(i:, 9--'Z-9(i;: TEMP $1JF:VEY RLt,,'g i: :5:" : ..;- ~ 9-23-9,':: ]"EMP ;ii:URVEY RLJN ! :.:.i.': i :3 '- i 9 - '~. 9 - 9 ":",, p n,,, 0 ~, ,_, ,.,n, ~ ,": "r, .~'r 0 r-..i. ~:', P..,.~'"~ F :[ L E ~', ..._., ..~ ' ~'~ 1 , 5:" ~ 8-' ~ 4 9 .... 2'2'-9 (:.:, T B !]- F:' L'.' N C H i:.:: F;..' R E C 0 R D F,.' U N i , 5'-" F'WDWi --'.'.:'~ 9--":,2-9-9;..:) ('_-:-I;.'.,/CCL RUN i , ::i.;" i::' i;j ~) i,,J i '- 2 :--'ii ':F .... '.-'.'Z 2 '" ':..':' (:) e )!:- ~:;.'. F: f;..' ~:. 1.'} 0 ?;.'. [.) R O N !., ~.:.::" F'i_EA~:E ;~..':.r. Gi"-.s.' AND F.'.E'T'UF;.'.N THE A'F'T'ACHEO CuF"f A;".: RECiE.[F"i' uF' '.C, ATA~ ,".. E ..., I::. i: V E D B Y HAVE A ~"~'r."'E.,~.,., DAYI. 5'Ai..LY HOFFE?CK A 'T F] ..- ,i :=.' ") ,:;' D ]: $ "F F.'. I B U '[ ]: 0 N · ,-'"' CENTF;,'AL. F'ILE$ :,",:C t"i IE V R 0 N EY.'TF'NZ !ON EXPLF-IRA'F I ON EXXON MARATHON F'H ! L L '£ F' ~ I:'B WEI_L. F]:LFZ.'.:':: R ~ ,--. D .BPX STA-rE OF ALA;'~.'KA s TEY. ACO THE f":F'II:;:F;:t::F':TE'D APl:Il: FOR F'WDWi-9'' "" ~':~)-(~'-..,~-".,':~nga-~:~i ............. ,;.. ~-~ ]: ~'~ _,. .......... ,_ . ~, RECEIVED OCT 1 9 1990 Alaska 011 & ~ms Cons. Commission Anchoraoe 1. Operations Performed: 2. Name of Operator OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation Shutdown __ Stimulate X Plugging __ Re-Perforate X Alter casing X Repair well Pull tubing X Other ~ Workover 6. Datum elevation (DF or KB) ARCO Alaska. Inc. 3. Address =P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 2290' FSL, 56' FEL, Sec. 14, T10N, R14E, UM At top of productive interval 1316' FNL, 1783' FEL, Sec. 14, T10N, R14E, UM At effective depth 1145' FNL, 1866' FEL, Sec. 14, T10N, R14E, UM At total depth 1097' FNL, 1890' FEL, Sec. 14, T10N, R14E~ UM 12. Present well condition summary Total Depth: measured 1 0055' true vertical 9511( Effective depth: measured 9985' true vertical 9444' Casing Length Conductor 8 0' Surface 2738' Intermediate Production 1 0033' Liner 2796' Perforation depth' measured 13. Size 20" 13-3/8" 9 -5/8" 7" 9360'-9415', 114. 15. 5. Type of Well: Development Exploratory I Stratigraphic feet feet feet feet .... feet 74' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number 13-1 9. Permit number/approval number 78-60 / 90-580 10. APl number 50-029-20323 11. Field/Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Plugs (measured) None Junk (measured) None Cemented Measured depth 167sx AS II 129' 6800 sx AS II & 2738' Top job w/ 100 sx AS II 1250 sx Class G & 1 0033' 300 sx AS I 466 sx Class G 6965'-9761' 9435'-9475' true vertical 8862'-8913', 8933'-8970' Tubing (size, grade, and measured depth) 5-1/2" / 3-1/2", L-80, tbg w/tail @ 9081'WLM Packers and SSSV (type and measured depth) Baker 'FB-I' pkr ~ 8980'WLM, Camco 'BaI-O' sssv @ 2220' Stimulation or cement squeeze summary See attached Workover Well History for details Intervals treated (measured) All Perforations f/ 9222'-9529' Treatment description including volumes used and final pressure 90 bbls 15% HCl & 392 sx Class G True vertical depth 129' 2738' 9497' 6676'-9231' Recresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 16. Status of well classification as: Water Injector__ Oil X Gas Suspended . N/A Prior to well operation Subsequent to operation Attachments *Workover Well History Copies of Logs and Surveys run Daily Report of Well Operations X* 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Tubing Pressure Drilling Analyst Service Date /~)-~- ~) SUBMIT IN DUPLICATE .~i~ned ~~ ~~,A~ Title Form 10-404 I:~v 05/17/89 ARCO Oi~~·.d Gas Company ,~,'~* Well History - Initial Report - Daill Instructions: Prepare and submit the "initial Reporr' on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ARCO ALASK,A INC. 1C°unty* parish °r ~)q~ S LOP E IState Field PRUDHOE BAY ILease or U.it ADL: 28315 Title WORKOVER Auth. or W.O. nf%s3773 AK API: 50-029-20323 Operator ARCO IARCO W I 22. 0000 Spudded or W.(~'~T IDate 8/14/90 IH°ur 0000 HRS IPri°r status if a w'o' Date and depth as of 8:00 a.m, 08/14/90 ( TD: 0 PB: 9985 SUPV:DAC 08/15/90 ( TD: 0 pB: 9985 SUPV:DAC 08/16/90 ( TD: 0 PB: 9985 SUPV:RWO 08/17/90 ( TD: 0 PB: 9985 SUPV:RWO 08/18/90 ( TD: 0 PB: 9985 SUPV:RWO 08/19/90 ( TD: 0 PB: 9985 SUPV:RWO 08/20/90 ( TD: 0 SUPV:RWO Complete record ~T d~4rep°rted 1) !2) 4) The above is correct Signature~ . ~ ~ % For form prep)ara~ion'and dis~ribu"tilon, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-1-D ATTEMPTING TO CUT TBG 9-5/8"@10033' MW: 8.5 FSW FIN YEARLY RIG MAINTENACE. MOVE RIG TO DS 13-1. ACCEPT RIG @ 00:00 HRS 8/14/90. R/U TO KILL WELL. PUMP 240 BBLS SEAWTER DN TBG. R/U ATLAS E-LINE. RIH W/ JET CUTTER & CCL. ATTEMPT TO CUT TBG @ 8256', NO INDICATION THAT CUTTER FIRED. ATEMPTING TO REFIRE CUTTER. DAILY:S57,640 CUM:$57,640 ETD:S57,640 EFC:$1,004,000 RESTRING TRAVELLING BLOCK 9-5/8"@10033' MW: 8.5 FSW KILL WELL. ND TREE/NU STACK. BOLDS. 1 LDS SHEARED OFF. ATTEMPT DRILLOUT. ATTEMPT PULL HANGER TO FLOOR. PULL AGAINST DRILLED OUT LDS AND ATTEMPT TO SHEAR SAME. SPEAR RELEASED/SLIPPED. JUMPED 2 SHEAVES ON TRAVELLING BLOCKS. RU TO RESTRING BLOCKS. DAILY:S30,842 CUM:$88,482 ETD:S88,482 EFC:$1,004,000 RIH W/BHA#2 ON 3-1/2" DP 9-5/8"@10033' MW: 8.5 FSW FINISH RESTRING TRAVELLING BLOCK. FINISH DRILL OUT LDS. ENGAGE LANDING JOINT AND POOH W/TBG HGR. POOH LD 5-1/2" TUBING. MU SPEAR. RIH W/SAME. DAILY:S26,660 CUM:$115,142 ETD:S115,142 EFC:$1,004,000 POOH 9-5/8"@10033' MW: 8.5 FSW FINISH RIH AND SPEAR INTO FISH. ATTEMPT RELEASE K-ANCHOR AND POOH. NO K-ANCHOR. LD 5-1/2" TUBING. CHANGEOUT BHA. RIH. TAG AND WASHOVER FISH. POOH. DAILY:S34,216 CUM:$149,358 ETD:S149,358 EFC:$1,004,000 POOH W/PBR BBL 9-5/8"@10033' MW: 8.5 FSW FINISH POOH W/TBG. RIH. ENGAGE FISH. POOH W/SEAL ASS'Y. RIH. ENGAGE FISH. POOH W/PBR BBL. DAILY:S26,924 CUM:$176,282 ETD:S176,282 EFC:$1,004,000 CONT POOH W/PBR BBL 9-5/8"@10033' MW: 8.5 FSW FINISH POOH W/PBR BBL. RIH AND MILL PACKER. POOH W/PACKER. PACKER HUNG UP AT 7443'. PULL FREE F/PACKER. POOH. CHANGE BHA. RIH. LOCATE PACKER AND SPEAR SAME. POOH W/PACKER. DAILY:S26,880 CUM:$203,162 ETD:S203,162 EFC:$1,004,000 RIH W/BAKER RBP POOH W/PACKER. R~g w/RBP. 9-5/8"@10033' MW: 8.5 FSW RIH AND CLEAN OUT TO PBTD AT 9977'. POOH. DAILY:S60,323 CUM:$263,485 ETD:S263,485 EFC:$1,004,000 all daily well history forms consecutively iPage no. ARCO Oil a~r,.. Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforaling, show formation name in describing work performed. Number a;I drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when fiilecl out but not less frequently than every 30 days. or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District AI~.(,~O Field PRUDHOI5 Complete record Date and depth as of 8:00 a.m. u~/zA/90 TD: 0 PB: 9985 SUPV:RWO 08/22/90 TD: 0 PB: 9985 SUPV:RWO 08/23/90 ( TD: 0 PB: 9764 SUPV:RWO 08/24/90 ( TD: 0 PB: 9764 SUPV:DAC 08/25/90 ( TD: 0 PB: 9715 SUPV:DAC 08/26/90 ( TD: 0 PB: 9715 SUPV:DAC 08/27/90 ( TD: 0 PB: 9715 SUPV:DAC 9) 10) 11) 12) 13) 14) for ea~whN~driliing or workover in progress a'r'r~'~' ~-~ND HOL~-iN 9-5/8 9-5/$~i0033~ h~: 8.5 ESW RIH W/RBP. ATTEMPT TO SET AND TEST CSG. NO TEST. BEGIN ISOLATE LEAK IN 9-5/8" CASING. (NOTE: TWO BAKER RBP'S WERE RUN AND BOTH PIECES OF EQUIPMENT FAILED. A HALLIBURTON RBP WAS FINALLY RUN, WHICH PERFORMED PROPERLY, AND WAS USED TO ISOLATE THE LEAK.) DAILY:S33,119 CUM:$296,604 ETD:S296,604 EFC:$1,004,000 RD ATLAS WL 9-5/8"@10033' MW: 8.5 FSW ISOLATE HOLE IN 9-5/8" CASING. SET RBP. HANG WORKSTRING ON RTTS/STORM VALVE AND CHANGEOUT TUBING HEAD. RELEASE RTTS/STORM VALVE AND RETRIEVE RBP AND POOH. RU WESTERN ATLAS AND RUN VERTILOG. RUN GR/JB TO 9770' WLIH W/9-5/8" EZSV AND SET AT 9764'. WLOH AND RD WESTERN ATLAS. DAILY:S39,193 CUM:$335,797 ETD:S335,797 EFC:$1,004,000 CIRC HEC SWEEP AFTER SQZ 9-5/8"@10033' MW: 8.5 FSW PU RTTS AND RIH. SET RTTS 9100' PUMP ACID (90 BBLS, 15% HCL FOLLOWED W/22 BBLS SEAWATER. PUMP 392 SX CLASS 'G' CEMENT. RELEASE RTTS. POOH. MU 8.5" BIT. RIH AND TAG CMT 9106'MD. CLEAN OUT TO EZSV AT 9764'MD. PUMP 50BBL HEC SWEEP WHILE CBU. DAILY:S117,622 CUM:$453,419 ETD:S453,419 EFC:$1,004,000 CIRC & PREP TO CMT LINER 9-5/8"@10033' MW: 8.5 FSW FINISH CBU. POOH TO 7458'MD. TEST CSG. FINISH POOH. RU AND RUN 7" 29#, BTC LINER F/6965'-9764' MD. CIRC AND PREPARE TO , CEMENT LINER. DAILY:S28,381 CUM:$481,800 ETD:S481,800 EFC:$1,004,000 CIRC AFTER DRILL OUT CMT 9-5/8"@10033' MW: 8.5 FSW FINISH RIH W/7",29# LINER. CEMENT LINER. SET HANGER. SET LINER TOP PACKER. REVERSE OUT. POOH. RIH W/4-3/4" BHA. TAG CMT INSIDE LINER. DRILL OUT TO LANDING COLLAR. CIRC TO CLEAN OUT HOLE. DAILY:S128,342 CUM:$610,142 ETD:S610,142 EFC:$1,004,000 POOH W/PERF GUN 9-5/8"@10033' MW: 8.5 FSW FINISH CBU AFTER CLEAN OUT. TEST 9-5/8", LINER LAP, AND 7" CASING TO 3000 PSI. OK. POOH LDDP. RU SCHLUMBERGER TO SHOOT ORIENTED PERFORATIONS. RIH W/GUN #1. DID NOT FIRE. WLOH. DAILY:S31,646 CUM:$641,788 ETD:S641,788 EFC:$1,004,000 RIH TAPERED COMP ASS'Y 9-5/8"@10033' MW: 8.5 FSW FINISH SHOOTING ORIENTED PERFS F/ 9435'-9475', 9'415'-9360', W/ 4 SPF @ 180 DEGREE PHASING. SET BAKER FB-1 PACKER ON E-LINE. RIH W/3-1/2" X 5-1/2" TAPERED COMPLETION ASS'Y. DAILY:S299,529 CUM:$941,317 ETD:S941,347 EFC:$11003,970 : . The above is correct For form preparation and d~Stribution ~, see Procedures Manual Section 10, Drilling, Pages 86 and 87 Title n.llll~n .~,1 Iht_ AR3B-459-2-B Number alt daily well history forms consecutively [Page no. as they are prepared for each well. I ARCO ~.i .~nd Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Rel~ort" on the first Wednesday after allowable has been assigned or well is Plugged. Abandoned. or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official lest is not required upon completion, report completion and representative test data in blocks provided The "Final Report" form may be used for reporting the entire operation if space ~s available. Accounting cost center code State AK Well no. DS 13-1 District County or Parish ARCO ALASF~A INC. NORTh[ SLOPE Field Lease or Unit PRUDHOE BAY ADL: 28315 Auth. or W.O. no. T tie AS 3773 WORKOVER API: 50-029-20323 Operator A.R.Co. W.I. 22. 0000 Spudded or W.O. begun Date ACCEPT 8/14/90 Date and depth Complete record for each day reported as of 8:00 a.m. AUDI #4 08/28/90 ( TD: 0 PB: 9715 SUPV:DAC Iotal number of wells (active or inactive) on this pst center prior to plugging and bandonment of this well our IPrior status if a W.O. 0000 HRS I RIG RELEASED 9-5/8"@10033' MW: 8.5 FSW FINISH RUN 3-1/2" X 5-1/2" COMPLETION ASS'Y. STING IN, SPACEOUT, LAND, TEST TUBING, TEST CASING, OK. ND/NU. TEST TREE ASS'Y. OK. SHEAR OUT. RELEASE RIG @ 2130 HRS, 8/27/90. NOTE: CAMCO 'BAL-O' SSSV @ 2220', BAKER 'FB-i' PKR @ 8980'WLM, & TT @ 9081'WLM. DAILY:S95,135 CUM:$1,036,452 ETD:S1,036,452 EFC:$1,004,000 Old TD Released rig Classifications (oil, gas, etc.) New TD Date Type completion (single, dual, etc.) PB Depth Kind of rig Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir ;Producing fnterval Oil or gasTest time Production Oil on test i Gas per day Pump size, SPM X length Choke size. T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signal .... ~~'~ ~,~ I D~~~..~ ITitle For form prSarati ....d O,s,,,,,,,o,, Drilling Supt. see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C Number all daily well history forms as they are prepared for each well. consecutively Page no. Divtston of AtlantlcRichfieldCompany STATE OF ALASKA ~ ALASKA(. AND GAS CONSERVATION C(~r ~IISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging ,, Perforate ~ Pull tubing Alter casing ,,, Repair well Olher ~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2290' & 56' W of SE cr, Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' W of NE cr, Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890' W of NE cr, Sec. 14, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic 6. Datum of elevation(DF or KB) 74 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 13-1 9. Permit number/approval number 78-60/9-732 10. APl number 50 - 029-20323 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10055 feet 9511 feet Plugs(measured) Effective depth: measured 9985 feet true vertical 9444 feet Junk(measured) Casing Length Size Conductor 129' 20" Su dace 2664' 13-3/8" Production 9959' 9-5/8" Cemented 167 sx AS II 6800 sx AS II 1250 sx Class G Measured depth 129' 2738' 10033' RECEIVED True vertical depth 129' 2737' 9497' Perforation depth: measured 9360-9415'; 9435-9475' true vertical 8862-8914'; 8933-8970' SEP 3 ]990 Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 9005' MD; 4-1/2", 12.64t, N-80, NPCT tail @ 9126' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2189' MD; Baker SAB packer @ 8993' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Job cancelled. The POGLM installation was not done. A RWO was done 8/90 to repair the well. Treatment description including volumes used and final pressure 14. Prior to well operation Reoresentative Daily Averaoe Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure .. Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X... Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 ~///o/90 Date SUBMIT IN DUPLICATE 511 CMH c: J. Gruber, ATO-1478 SH ARCO ALASKA: .INC. P.. O. BOX i (-)(.)36,;-} ANCHORAGE: ALASKA ~-.': :':~ T E ·9-6-9() REFERENCE' ARCO CASED HOLE FINALS -6 8-i ;3-90 F'RODUCTION PROFILE -t i 8'-6-9'.'~': F'RODUCI-ION PROFILE ..... S-9.'6' .~'-Z; 8-i F'RODUCTION F'F;OFILE '-~ -'-' R,. ,-, 8-i ,~ -~ - ¥'~""'.; F'ROD! IC'¥ ION_ PROFILE 4- 6 9-2-96., C 0 LL.A R / P E:RF -~- 8-i i '-gE~ F'F.:rjDUCT I ON F'ROF :[ L_E i -9 8- 9- 9,.':~ F'I T£-' · 5.-i 8-25-9,'.} F'E F;.:Iz RECORD 3 - i ..,° _ .-.:,.. ,~-...... o, ,-.~,..., (:; R / C C L ~.-4 8-9-9,:;, LEAK DETECTiON/GA~,' I_IFT 5'- i i 8-6-9,3 P I 'i" ;'.7 .., i ..~ 8'- 6-- 9,:'} F' i[ '1" $ 's.., '- ~.'~'" ,~ '') 8 - 2 S - 9 '.';:,C N t... '=' '-':"-'8-'P-~ - e ('} F-' ;[ T $ t "?'- 3; ,.q- p,_ c.,,.:., ........ I::'RODUCT I ON, '"""r I,.t. JF ..... I LE 8'- 2,:'} o ,-,.'z. ,.'.~,:., .-, ~ .~ - ,, ,~ - ,' ,'-: L- r.-'. L ,:, - ,...c' --~ A:_: 8 - '29 - 9 ¢ C C L F'LEA;~E SIGN AND RETURN 'THE ATTACHED COPY RIECEIYED BY HAVE A NICE DAY! ;S'ALL. Y HOFFECKFR ATO- ~ 529 RECEIVED SEP 1 2 1990 .Ala .Oil .& 6ons. Gomm ¢oa ctiomge DISTRIBUTION RtlN_ t, _,n'" RUN i , _,~' RUN i , 5' RUN i , 5" RUN. i, _:. "'-" RUN i., .5" RUN i , .;.~'" RUN i , 5" RUN i , ..,=-:" RUN i , 2'*"~'",.,.' RUN t, 5' RUN t, 5:' RUN t, _.~"" RUN t., 5" RUN i, 5" F;:tJNt, 5" RUN ~ , 5" AS RECEJ:F'T OF DATA CENTRAL FILES CHEYRON D&M EXTENSION EXF'LORATION EXXON MARATHON MOBIL ,! APPROVEp..~ T R A N $ ~- ~;~ 35:3 PHILLIPS PB WELL FILES' R & D BPX STATE OF ALA2-'KA TEXACO CAMCO (]AMC(] CAHCO C A d C 0 A -I" L. A ;ii: C A M C 0 E: A M C' 0 $ C H J,., J"i C A i,i C C) CAMCO CAMCO ;"..': C H 3.'CH CAMCO $CH A'f'LA~.;' ARCO ALASKA, ]iNC. F'.O· BOX i00360 ANCHORAGE, ALASKA DATE' 8-28-90 REFEREN.,~ ARCO CASED HOLE FINALS -'7 8-2--96~ -9 8-i -90 -~ 6, 8-5-9~-] ~-~2 8-4-90 -20 8-4-9~ ~. ,.. 8-5-90 V7-34 8-20-90 ¢'--~ 4 8-i ~9-.42 8-i 8-90 d9.-.42 8- i 8-96, i -7 8-i 6-90 3.-~ 8-2t ;5-t 8-2t -90 5-5 8-3-90 4-i 5 8-':35-9¢ '.?-~ ~ 8-s-~e ¢~',s-~ ~ 8-~--~e LEAK PRODUCTION PROFILE PRODUCTION PROFILE LEAK DETECTION F'RODUCTION PROFILE PRODUCTION PROFILE COLLAR/PERF COLLAR/RERF COLLAR/PERF RERF RECORD GR-CCL JEWELRY RERF RECORD COLLAR/F'E-"RF COLLAR VERTILOG PRODUCTION PROFILE COLLAR/PERF DATAFRAC SURVEY TEMP DECAY D I AGNOS'I' I C FM DETECTION/PROD F'ROFILE RUN i, RUN i, RUN i, RUN i, RUN i, RUN i, RUN i, RUN i, RUN i, RUN ~, RUN ~, RUN t, RUN i, RUN 1, RUN t, RUN i, RUN i, RUN t, RUN t, 5" 5' 5' 5' 5' 5" 5' 5' 5" 5' ~2-m 2"'&5' RETURN THE ATTACHED bOFf AS RECEIPT Pt_EASE SIGN AND "~ " '-" "' RE ~EI'v'ED BY HAVE A i-liCE DAY! S.Fc_..p-5~ s Al.l_ Y HOFFE CK E~sska..Oil & Gas Go~s. Go~¢~'~ OF DATA. AF'F'ROVED ~' 'I'R AN,S' ~ 9~ CAMUO CAMCO CAMCO CAMCO CAMCO CAMCO ATLAS ATLA~ A'f'LAS $CH $CH .SCH ATLAS AI'LA~ A'[LA~' CAMCO A 'IL A ~' CAMCO CAMCO CAMCO DISTRIBUTION CENT~(AL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL · " PHILLIPS 'Ir F'B WELL FILES R & D ~ BPX ~"FAT'E OF ALA~,KA. '" TEXACO STATE OF ALASKA ' ALASK/~'' '_ AND GAS CONSERVATION C({~ .vllSSION ~ ~ APPLlCA, ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon...-. Suspend ~ Operation shutdown ~ Re-enter suspended well Alter casing , Repair well Plugging ~ Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 5. Type of Well Development X Exploratory Stratigraphic Service 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2290' & 56' W of SE cr, Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' W of NE cr, Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890' W of NE cr, Sec. 14, T10N, R14E, UM 6. Datum of elevation(DF or KB) 74 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 13-1 9. Permit number 78-60 10. APl number 50 - 029-20323 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 129' Sudace 2664' Production 9959' 10055 feet Plugs(measured) 9511 feet 9985 feet 9444 feet Junk(measured) SiZe Cemented 20" 167 sx AS II 13-3/8" 6800 sx AS II 9-5/8" 1250 sx Cl 'G' Measured depth 129' 2738' 10033' True vertical depth 129' 2737' 9497' RE ¢EIVED Perforation depth: measured 9360-9415'; 9435-9475' AUG true vertical 8862-8914'; 8933-8970' ~ DJ[ ~ ~a$ Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 9005' MD; 4-1/2", 12.6#; 1t~-8~T tail @ 9126' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2189' MD; Baker SAB packer @ 8993' MD 13. Attachments Description summary of proposal x Detailed operations program .~. BOP sketch x 14. Estimated date for commencing operation September 1990 16. If proposal was verbally approved Oil X Gas Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ' Title Sr. Area Operations Engineer FOR I~{3MMI~II3N H~I= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- 15. Status of well classification as: Suspended Approval No~, Approved by order of the Commissioner Form 10-403 Rev 06/15/88 510 LBL c: J. Gruber, ATO-1478 SH Approved Copy R.etumed q/ !qo Commissioner ORIGINAL SIGNF-I~§'I~MIT IN TRIPLICATE . 5. 6. 7. Drill Site 13-1 Zone 4 Fracture Treatment Preliminary Procedure Fracture treat DS13-1 as follows: 1. MIRU fracturing service COmpany. 2. Pressure annulus to 3000 psig. 3. Pump the propped fracture lreatment in intervals: MD referenced tO the BHCS log dated 11/23/78, · Prelim/nary using gelled water and Carbolite or LWP proppant at 60-70 bpm. pump schedule is listed below. a. 300 bbls Pre-Pad b. 6000 bbl Pad. c. 3000 bbl Slurry at 1-12 PPG w/th 510,000 lbs Proppant. d. Flush to perfs. RDMO fracturing service company. Cleanout excess proppant to PBTD with CTU if needed. MIRU slickline to tag fill and replace gas lift valves. Place well on production. R[¢EiVED AUG 3 1 1990 Oil & Gas Cons, i~omm_'tssiol~ ~chorage 6 5 4 2 I !. COILED TUBING UNIT BOP EOU 1 PHEN? t.5000 PSI ?" WELLH~ CONN£CTOR FLANG£ !.5000 PSI 4 1/16" PIPE RAMS I~. 5000 PSI 4 1/6" HYD~LK~ SLIPS I.5000 PSI 4 1/6" SHEAR RAMS ~.~K)O0 PSI 4 1/6" BLIND RAMS ~.5000 PSI 4 1/16" STUFFING BOX 2 RECEIVED AU G ~ 1 1990 Oil & Gas Cons. uom ~ohorage HIRELINE BOP EGUIPMENT _ III III Il III I I 1. ~000 PSI ?" WELLHEAD CONNEC10R FLANGE 2. 5000 PSI WIRELINE RAUS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OF'F ARCO Alaska, In[ Prudhoe Bay P..,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 16, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1, Permit No. 78-60 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Sincerely, D. F. Scheve DFS/CMH/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 13-1)Wl-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132~C STATE OF ALASKA ALAS~ ~ILAND GAS CONSERVATION APPLICATION FOR SUNDRY/ wPROVAL 1. Type of Request: Abandon Suspend .,, Operation shutdown Re-enter suspended well Alter casing Repair well Plugging , Time extension Sl~mulate Change approved program Pull tubing Variance Perforate 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2290' N & 56'W of SE cr, Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' W of NE cr, Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890' W of NE cr, Sec. 14, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service Other X 6. Datum of elevation(DF or KB) 74 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 13-1 9. Permit number 78-60 10. APl number 50 - 029-20323 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10055 feet Plugs(measured) 9511 feet Effective depth: measured true vertical Casing Length Conductor 129' Sudace 2664' Production 9959' Perforation depth: 9985 feet 9444 feet Junk(measured) Size Cemented Measured depth 20" 167 sx AS II 129' 13-3/8" 6800 sx AS II ~, , 9-5/8" 1250 sx Class G 10033' True vertical depth 129' 2737' 9497' measured 9222-9240'; 9326-9350'; 9360-9386'; 9397-94i3'; 9435-9475'; 9491-9529' true vertical 8734-8751'; 8831-8853'; 8862-8887'; 8897-8912'; 8933-8970'; 8985-9021' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 9005' MD; 4-1/2", 12.6#, N-80, NPCT tail @ 9126' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2189' MD; Baker SAB packer @ 8993' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation August 1989 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby/qertify that the foregoing is true and correct to the best of my knowledge. Signed .~~~__~~U/~~.~ Title Operations Engineering Manager 15. Status of well classification as: Oil x Gas Suspended Date FOR COMMI~.~ION H~E ONLy Conditions of approval: Notify Commission so representative may witness Plug integrity .. BOP Test Location clearance Mechanical Integrity TeSt Subsequent form required 10- ~/-/- ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Commissioner I Approval No. ~C~'_ '~ ~:~ ,~ Approved Copy Returned Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE 149 C. M. Hightower, 263-4713 DS 13-1 Gas Lift Installation Procedure AFE: AP 2162 (Gas Lift) 1. RU WLU, test lubricator, and pull SSSV. Make gauge/dummy run through 5-1/2" tubing to -+ 8000' md. The OD of the retrievable packoff gas lift assembly to be run is 4.530" and the overall length is + 20'. Weight is approximately 600 lbs. Run smaller gauge through R landing nipple (3.759" ID) at 9064' md to insure clearance for nipple reducer. 2. Set AVA "SEL" nipple reducer (2.250" ID) in R nipple at 9064' md. POH. RD WLU. 3. RU electric line unit, test lubricator and run collar log from 7500' to 3500'. Tie into Western Atlas collar log dated 11-20-87. 4. Using 3-1/8" OD steel carrier with circulating charges, perforate 5-1/2" tubing at + 7327' md. Perforate two holes(_+ 0.50" diameter) on high side of tubing 0.5'-1' from collar (to give standoff). Deviation @ this depth is 27.5°. 5. Run AVA POGLM assembly (4.530" x 20.2') and set across perforated holes at 7327' md using Baker model 20 setting tool. The mandrel should be run with an equalizing dummy installed. 6. Pick up and run second AVA POGLM assembly with dummy installed in the mandrel. Set POGLM across previous Kinley button site at 4042' elm (ref: WA log dated 11-20- 87). POH and rig down ELU. 7. RU WLU, test lubricator and set circulating plug in SEL LN @ 9064'. Test POGLM installation by filling 5-1/2" tubing with fluid and pressuring up to _+ 2000psi. Pull and reset assemblies as required, if test fails. 8. If satisfactory, bleed pressure off and pull plug from SEL LN. Pull dummies from gas lift mandrels. Install 1" gas lift valves as per attached design and RD WLU. 9. Return well to production and test. SBHP: 3705 psi @ 9372' ( 8874' TVD, 8800' SS ) SBHT: 200° F @ 9372' Tubing: 5-1/2", 17ppf, N-80 Min ID: 3.759" @ 9064' md Baker model R landing nipple Tubing capacity to R LN @ 9064' md = 209.8 bbls H25:6 ppm ( 4-8-89 ) 'Well 13-1 Spud Date: 11-8-78 Original RKB: 74' p of Sadlerochit: 9322" ~lus Fluid: Diesel/10.6~ CaCl2 Reference Log: BHCS 11-23-78 All Depths are RKB MD to Top of Equipment. · Jewels/ , .rcO Alaska Inc.- Prudhoe B? y Field ~PI#: ~20323 Well Type: Producer 'Completion Date: 12-1-78 New [] Workover !"! Hanger Type: OCT Hanger: 25' Maximum Hole Angle: 27e Angle Through Sad.' 21e 10 11 218~ 8818' 8906' 8956' 8993' 9005' 9064' 9125' 9126' 9106' 5 1/2' Cam¢:o BaI-OSSSVNipple.* ID=4.562" Baker L Sliding Sleeve Baker R Landing Nlpple: ID = 4.223" BOT SBR Assembly Baker SAB Packer Crossover:. 5-1/2" x 4-1/2' Baker R Nipple: ID = 3.759" Baker Shearout Sub Tubing tail: 4-1/2" ELM tubing tail: 12-2-78 Minimum ID:. Baker R Nipple: ID = 3.759" Cadng and Tubing 13-3/8" 72# N-80 0 9-5/8" 47# N-80 0 5-1/2" 17f N-80 0 4-1/2' 12.6~ N-80 Bottom ~ 2738' Casing 1~' Casing 900~ NPC tub~-,g 9126' NPC tubing tail Gas Lift Information ~ Stn. ~ ~ ~ Latch ~ TRO 12 4042" 1 None Kinley Button Orifice None 1/4" I 2 $ 4 5 6 7 1 8 ~, 10 9 2 p,~:c,~, -~ 3 · 13 Perforation Data 99~-9240 Sag 18 6 9326-93,50 4 24 4 7 8,9 936G9386 4 ~) 4 9397-9413 4 16 4 9435-9475 4 4] 4 9491-9529 4 38 4 13 n i1 ri 8-6-87 SQZ Perfs CTU ~ 8-11-87 Aperf: 8-31-87 1-25-86 Aperf CTU SQZ~ 8-11-87 Aperf: 8-31-87 1-25-86 Aperf. CTU SQ7.; 8-11-87 Aperf: 8-31-87 4-25-79 CTU SQZ: 8-11~87 Ape~ 8-31-87 4-25-79 CTU SQZ: 8-11-87 Ape~ 8-31-87 4-25-79 CTU SQZ; 8-11-87 Aperf: 8-31-87 11 PBTD = 9985' TD = '1(X]55' Datum 8700" SS = 9265' MD 8800' SS = 9372" MD Revision Date: 11-11-87 Reason: Shot Klnley Button Previous Revision: 9-6-87 Well 13-1 6 ,5 4 3 2 COILED TUBINg UH]T BOP EOM l PMEN~ 1. 5000 PSI 7" WELLHEAD CONNECTOR FLAI~0£ 2. 5000 PSI 4 1/16" PIPE RAHS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAHS 6. 5000 PSI 4 1/16" STUFFING BOX 3 N]REL INE BOP EOUIPHENT 1. 5000 PSI ?" W£LLHEAI:) CONN£CIOR FLANGE :2. 5000 PSI WIRELIN[ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Operation Shutdown _ Re-enter suspended well _ Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate Change approved program _ Pull tubing X Variance _ Perforate _ Other X Workover 2. Name of Operator 5. Type of Well' 6. Datum elevation (DF or KB) Development X ARCO Alaska. Inc. Exploratory _ RKB 74' feet 3. Address Stratigraphic _ 7. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 Service _ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2290' FSL, 56' FEL, Sec. 14, T10N, R14E, UM 13-1 At top of productive interval 9. Permit number 1316' FNL, 1783' FEL, Sec. 14, T10N, R14E, UM 78-60 At effective depth 10. APl number 1145' FNL, 1866' FEL, Sec. 14, T10N, R14E, UM 50-029-20323 At total depth 11. Field/Pool Prudhoe Bay Field 1097' FNL, 1890' FEL~ Sec. 14~ T10N~ R14E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 10055' feet Plugs (measured) None true vertical 9511 ' feet Effective depth: measured 9985' feet Junk (measured) None 0IP ~ c~ ~ ~r ~ true vertical 9444' feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 167 sx AS II 1 29' 1 29' Surface 2738' 1 3-3/8" 6800 sx AS II & 2735' 2738' Intermediate Top job w/ 100 sx AS II Production 1 0033' 9-5/8" 1250 sx Class G & 1 0033' 9497' 300 sx AS I Perforation depth: measured 9222'-9240', 9326'-9350', 9360'-9386', 9397'-9413', true vertical 8734'-8751', 8831'-8853', 8862'-8887', 8897'-891 ' 8933'-8970', 8985'-9021' Tubing (size, grade, and measured depth J 5-1/2"/4-1/2,, N-80, w/tail @ 9126' Packers and SSSV (type and measured depth) Baker 'SAB' pkr @ 8993'r Camco 'BaI-O' sssv @ 2189' Anch0ra~;~ 13. Attachments Description summary of proposal X Detailed operation program _ BOP sketch X 14. Estimated date for commencing operation 15. Status of well classification as: Auoust 15, 1990 Oil .~ Gas m Suspended _ 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~U-) Signed ~ ~V,.J (~~H^_', Title Drillin~ Anal~,st ., s~ FOR COMMISSION USE ONLY 'Condition 3f approval: Notify Commission so representative may witness IApproval No. Plug integrity _ BOP Test _ Location clearance__ I. Mechanical Integrity Test~ Subsequent form require 10-ffOH original Signed. I5 ,: johnstor~ Approved by the order of the Commission David W. .. , Commissioner Date Form 10-403 Rev 06/15/88 ApproveO tj.opy SUBMIT IN TRIPLICATE PRE-RIG WORK: 1. Rig up slickline unit. Pull the SSSV at 2195' MD. Rig down slickline. 2. Rig up E-Line unit and cut the tubing at 8300' MD. Rig down E-Line. RIG WORK: 1. MIRU AUDI 4. 2. Kill the well with 8.5 ppg seawater. Nipple down tree. Nipple up and test BOPs. 3. Pick up spear and engage tubing. Lay down the 5-1/2" completion string. 4. Pick up drill pipe and RIH with fishing tools. Retrieve the tubing stub, remaining tubing and PBR. 5. Mill and retrieve the Baker"SAB" packer and tailpipe assembly. 6. RIH with 8-1/2" mill and 9-5/8" scraper. Cleanout to PBTD at 9985' MD. 7. RIH and set retrievable bridge plug at 9100' MD. Test casing to 3000 psi for 30 minutes. Release from bridge plug. 8. RIH storm packer / valve. Set storm packer / valve and test casing to 3000 psi. Release from packer 9. Install new FMC (4) port tubing head and test to 5000 psi. 10. RIH and retrieve storm packer / valve. 11. RIH and retrieve bridge plug. 12. Make up new production packer and tailpipe assembly. RIH and set packer at 8950' MD. Test packer to 3000 psi. POOH and lay down drill pipe. 13. Make up new production seal assembly. RIH with 5-1/2" completion assembly with treater string, GLMs, and SSSV. 14. Land tubing and pressure test the tubing and casing to 3000 psi. Freeze protect top 2000' with diesel. 15. Nipple down BOPs and nipple up tree. Test the tree to 5000 psi. Set BPV. Release rig. POST RIG WORK: 1. Rig up slickline and install the SSSV. ANTICIPATED BHP: 3705 psi (8.1 ppg) @ 8800' TVD WORKOVER FLUID: 8.5 ppg seawater REC tVED Anch0rag, 13-5/ '''' 5000 PSI BOP STACK ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 3 1.. 13-3/8" CASING HEAD 2.9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4. 13-5/8" - 5000 PSI BLIND RAMS 5.13-5/8" - 5000 PSI PIPE RAMS 6.13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 pSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSi WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 8/4/89 REVISION OF11/21/88 BOP SCH (FOR:AUDI 4,NORDIC 1) ARCO Alaska, Inc.~ Prudhoe Bay,_ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager ORIGINAL June 30, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1, Approval No. 9-461 Dear Mr. Chatterton' Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/jp Attachment CC: T. B. Gray, BP J. Gruber, ATO-1478 PI(DS 13-17) W1-3 RECF. IVF-D L - 3 IBB9 Gas GOBS. Gommissioi% ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-(~ STATE OF ALASKA ALASK,~ !LAND GAS CONSERVATION C~r- MISSION REPORT dF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pedorate Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2290' N & 56' W of SE cr, Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' Wof NE cr, Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890'W of NE cr, Sec. 14, T10N, R14E, UM 5. Type of Well Development Exploratory StratJgraphic ,, 6. Datum of elevation(DF or KB) 74 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 13-1 9. Permit number/approval number 78-60/9-461 10. APl number 50 - 029-20323 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured 10055 feet Plugs(measured) true vertical 9511 feet Effective depth: measured 9985 feet true vertical 9444 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 129' 20" 167 sx AS II 129' Intermediate 2664' 13-3/8" 6800 sx AS II 2738' ProduCtion 9959' 9-5/8" 1250 sx Class G 10033' True vertical depth 129' 2737' 9497' Perforation depth: measured 9222-9240'; 9326-9350'; 9360-9386'; 9397-9415;" 9435-9475'; 9491-9529' true vertical 8734-8751 '; 8831-8853'; 8862-8887'; 8897-8912'; 8933-8970'; 8985-9021' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80 NPCT @ 9005' MD; 4-1/2" 12.6#, N-80, NPCT tail @ 9126' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV - 2189' MD; Baker SAB packer @ 8993' MD 13. Stimulation or cement squeeze summary R ~ C 'E iV ~ [¢~ 14. Intervals treated(measured) See attached JUL - 3 19B9 Treatment description including volumes used and final pressure .l~Ip,,~,[t 0it & Gas Cons. Comm[s,~io~ Reoresentative Daily Average production or Injection Data Anctlot'ag~ OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 2511 4187 2465 -- 412 Subsequent to operation 2646 5566 2732 -- 254 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil., x. Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~)~~~~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 088 T. P. Allen, 263-4837 Date ~,./ZC//r"~' SUBMIT IN DUPLICATE TREATMENT: OBJECTIVE: INTERVALS: TREATMENT DATE: 1. 10. 11. Drill Site 13-1 Description of Work Performed Scale Inhibition Treatment To Scale Inhibit Sag River & Zone 4 Intervals 13. 12. k. B. O. D. E. 55 bbls of diesel 55 bbls of methanol 48 bbls of EDTA with additives and the solid and liquid diverter 234 bbls of scale inhibitor blend 550 bbls of 2% NaCI water w/1000 mg/I of DETPMP F. 55 bbls of diesel 215 bbls of dead crude 5 bbls of diesel RD and released equipment. well to production. Obtained a valid well test. Shut in well for 2 hrs. After this period of time returned RECEIVED J U L - Alaska Oil & Gas Cons. Commissior~ Anchorags 9222-9240, 9326-9350, 9360-9386, 9397-9413 & 9435-9475' and 9491-9529' MD (ref. BHCS 11/23/78) June 14, 1989 Obtained a valid well test. 2. Performed a fluid level survey on the 5-1/2 x 9-5/8" annulus. Fluid packed the 5-1/2 x 9-5/8" annulus with 182 bbls of dead crude and 4 bbl of diesel. 3. Loaded 50 bbls. of filtered fresh water for blending the EDTA. Loaded 232 bbls. of filtered 2% NaCI water for blending the scale inhibitor. 4. Flushed pumper with 2 bbls of filtered fresh water. 5. Mixed the remaining 2000 gals of filtered fresh water with 1550# of EDTA and additives. Checked pH, iron content and EDTA content. 6. Flushed pumper with 2 bbls of filtered 2% NaCI water and mixed one of the current acceptable amine phosphonate inhibitor blends. 7. Loaded 600# of solid OSR diverter and 50 gals of liquid OSR diverter 8. Loaded 55 bbls of methanol, 115 bbls of diesel, and 545 bbls of 2% NaCI water w/1000 mg/I of DETPMP. 9. Batched mix the 48 bbls of EDTA with 600# of solid diverter and 50 gals of liquid diverter. MIRU pump trucks and transports. Pumped the following fluids down the production tubing: ARCO Alaska, Inc.1 [ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 1, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1 Permit No. 78-60 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TPA/ljm Attachment cc' J. Gruber- ATO 1478 Pl(DS13-1)W1-3 RECEIVED ;fUN 02 1989 glaska Oil & Gas Cons, Commission ', ~chorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-(~ STATE OF ALASKA ALASKA ~' AND GAS CONSERVATION COl(~ 'ISSION APPLICAIlON FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 74' RKB 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 2290' N & 56' W of SE Cr. Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' W of NE Cr. Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890' W of NE Cr. Sec. 14, T10N, R14E, UM 8. Well number DS 13-1 9. Permit number 78-60 10. APl number 50 - 029-20323 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10055 feet Plugs(measured) 9511 feet Effective depth: measured true vertical Casing Length Conductor 129' Intermdiate 2664' Production 9959' Perforation depth: 9985 feet 9444 feet Junk(measured) Size Cemented Measured depth 20" 167 SX AS II 129' 13-3,8" 6800 SX AS II R E £ E IV E D ~., 9-5/8" 1250 sx Class G 10033' 02 t989 Alaska 0il & Gas Cons, C0mmissl0n Anchorage measured 9222-9240'; 9326-9350; 9360-9386'; 9397-9413'; 9435-9475'; 9491-9529' True vertical depth 129' 2737' 9497' true vertical 8734-8751'; 8831-8853'; 8862-8887'; 8897-8912'; 8933-8970'; 8985-9021' Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80 NPCT @ 9005' MD; 4-1/2", 12.6#, N-80, NPCT tail @ 9126' MD Packers and SSSV (type and measured depth) Camco Bal-0 SSSV @ 2189', Baker SAB Packer @ 8993' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch X. 14. Estimated date for commencing operation June, 1989 16. If proposal was verbally approved Oil x Name of approver Date approved Service 17. I hereby,.,certify that the foregoing is true and correct to the best of my knowledge. Signed ,~,~P~'~~~ Title 15. Status of well classification as: Gas ... Suspended . Operations Engineering Manager Date FOR COMMISSION USI= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test . Subsequent form required 10- Approved by order of the Commissioner Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY , ,~,,,,m C. SMITH J Approval ' A, pproved Copy Returnee Co m m issi ~(~--~----~-'D~Ce SUBMIT IN TRIPLICATE TIM ALLEN Drill Site 13-1 Scale Inhibition Treatment ARCO Alaska, Inc. proposes that a scale inhibition treatment be performed on Well 13-1. The treatment will be performed as follows: 1. Obtain a valid well test. 2. Perform a fluid level survey on the 5 1/2" x 9 5/8" annulus. Fluid pack the 5 1/2 x 9 5/8" annulus with dead crude/diesel. . Ensure that a corrosion pumpdown is not performed within a three weeks prior to this scale inhibition treatment. . Load 50 bbls. of filtered fresh water for blending the EDTA. Load 232 bbls. of filtered 2% NaCl water for blending the scale inhibitor. 5. Flush pumper with 2 bbls of filtered fresh water. 6. Mix the remaining 2000 gals. of filtered fresh water adding: -1550 lbs of Na2EDTA -4 gals of F75N, NE-18 or Losurf 300 -2 gals of A186, Cl-9 or MSA 7. Flush pumper with 2 bbls of filtered 2% NaCI water and mix one of the current acceptable amine phosphonate inhibitor blends. . . 10. 11. Load 600# of solid diverter and 50 gals of liquid diverter. Load 55 bbls of methanol, 115 bbls of diesel, and 545 bbls of 2% NaCl water w/1000 gm/I of DETPMP (190 lbs of active DETPMP). Batch mix the 48 bbls of EDTA with 600# of solid diverter and 50 gals of liquid diverter. MIRU pump trucks and transports. 12. Pump the following fluids down the production tubing: A. B. C. D. E. f. G H. 55 bbls of diesel 55 bbls of methanol 48 bbls of EDTA with additives and the solid and liquid diverter 238 bbls of scale inhibitor blend 545 bbls of 2% NaCl water w/1000 mg/I of DETPMP 55 bbls of diesel 215 bbls of dead crude 5 bbls of diesel 13. RD and release equipment. Shut in well for 2 hrs. After this period of time return well to production. 14. Obtain a valid well test. 5 4 3 2 COILED 'I'UBINI~ UN]T BOP EOU l PFIE N'T I.5000 PSI 7" WELLHEAD CONNECTOR FLANGEi ~.5000 PSI4 1/16" PIPE RAMS 3.5000 PSI4 1/6" HYD~LK~ SLIPS I.5000 PSI4 1/6" SHEAR RAMS 5.5000 PSI4 1/6" BLIND RAMS B.5000 PSI4 1/16" STUFFING BOX 3 RECEIVE , 'JUN o2 0ii & Gas Cons, Commission 'NI RL~aINE BOP -- I L II III I IIII III 1. 5000 PSI ?" WELLHEAD CONNECIOR FLANGE 2. 5000 PSI WlRELINE RAIaS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASi<A, INC. F'.O. BOX t(~'036~ ( ANCHORAGE, ALA3'KA 995 DATE' 4-26-89 REFERENCE: ARCO PRESSURE DA FA 2-i 0 4-t-89 BHP--SI'AI'IC GRAI)IENI' OTIS 4-29 2-22-89 BHF'--FLOWiNG GRADIENT CAHCO 5-i O 3-27--89 BHF"--SI'AI'IC GRADIENT CAMCO 6-3 4-i -8~ BHP--STATIC GRADIENT CAMCO ii-J6 4-t7-8~ BHF ....SI'AI'IC GRADIENT CAMCO ii--t7 4-t7-8~ BHF ....S'I-A'FIC GRADIENT CAMCO ii--J8 4-i7-8~ BHF'--'SI'ATIC GRADIENT CAHCO ti-24 3-'2~-8~ BHF ..... STATIC GRADIENT CAMCO i'2--i8 4-i8--8~ BHF ........ STATIC GRADIENT CAMCO i2-26 3'-:~-8~ BHF ..... ~TATIC GRADIENT OTIS i3-i 4--2-8~ BHF ..... STAI'IC GRADIENT OTIS i3-ie 4-3-8~ BHP ....~TATIC GRADIEN"F OTIS i4-ii 4--i-8~ BHF' .... ,?TAI'IC GRADIENT OTIS i4-t2 4-3-89 BHP--STA'rlC GRADIENT OTIS t 4-2i 4-.4-.8~ BHF ..... S'I'ATIC GRADIENI' CAMCO.. i 5'-i ~A 4-2-8~ BHP ....,S'TATiC GRADIENT CAMCO i 5-i ~ 4-.2-8~ BHF'--STATIC GRADIENT CAML;O t 5-22 4-2--8~ BHF ..... S'FATIC GRADIENT CAMCO i 5-25 4-.3--8~ BHF ....SI'ATIC GRADIENT CAMCO i 8-4 3-29-8~ BHP--SI'ATIC GRADIEN I' [)TIS i 8.-8 3-2~-.89 BHF ...... STA'FIC GRADIENT CAMCO t8-ti 3..-J~-8~ BHP--STA'FIC GRADIENF OTIS i.8-i 7 :(-.2~-.8~ BHF ..... STA'FIC GRADIENT CAHCO t 8-23 3-29-8~ BHF'--~TAFIC GRADIENT CAMCO PLEASE SIGN AND REI'URN THE ATI'ACHED COPY AS F~ECEIF'I' OF I)AI'A, RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-t529 ~._~k~ Oil & Gas Cons. Commissioll I'RANS~ 89177 Anchorage DISTRIBUTION CENTRAL FILES ~,~' PHIl_LIPS CHEVRON F'B WEL. L FILES ~~ D& M ~ R & D FXTFNSION EXF'LORATION ~'~ BPX ~ EXXON ~ STAI'E OF' ALASKA 'ir MARAI'HON ~: TE"XACO · -~' MOBIL ARCO ALASKA IN~ F'.O. BOX iOOS60 ANCHORAGE, ALASKA 995i0 DATE ' i 2-2(3-88 F.'EFF~'cuC~'', _., ARCO CA~ED un,,,~,..._L- ,C'rNAL&; ~ i -4 i t -S0-88 PITS 6-3 it-t8-88 PRODUCTION PROFILE · 9- S ~-.~'~ i ""- i "~-88.~ : Du:."AL. B U R i-:' T~ TDT-P , i i-i'--' i''~ 4-°8 PRODUCTiOn,! r.-."-,'-',', ~.' ,~-1 i i -i 6-88 PROt.:,UCTiON PF..'O~--.~.,...,... i .~--! S t i i ¢-88 F'ROD "'"'""ION ~i 6-6 i 4. -2t -o.o'~'"' F'ROD~ ~CT Z tiN,.., ~:'-'0~:-' ~'' ;: ~-:: , .,. ,_.,.. ~:' ~ i 7-9 i i-,:o'"'""-8~_ PRODUC'i" l ;"i~. , ,..,: F:'ROr-' ]:':...,--"' ~ OWDW-NW ii-t6-88 F'IT,~ PLEASE $i 'RECEIVED HAVE A NI GN AND RETURN '/HE IA i-'f'ACHEDD C(':~Y A;:..: F.'.ECEIP'/ '" ~ ' /~a~ ~Ji & Gas ~l'l& Commission ATO-t 529 .-. ..... 1P '..' '~.~ APPROVED D i ~'TR :[ BUT I ON Of'- '"' CENTRAl-. FILE~'',.., -,-'"' PHILLIPS · "' CHEVRON F'B WELL F. ILE,.? D & M R & D · '- EXTENSION, EXPI_ORATION '"- ~ .'- '"' r' · .' ~. 1'4 t' ..~ ',. EXX~ ~ :~ ~,- . U,4 '5'TATE r"F'.., ALA£,'K A.. HAF.'.A THON. ~ '~ TEXACO ~: MOBT. L ;:-'.:UN i , :::'-: UN 2, RUN i ,. RUN i, i:;.'U N i: RUN i, RUN i , RUN i, RUN i , DATA. CAidRO C ~ h~"'"'; ~ :-. u. AbJ C'; U A ¢;; L: L: C:AM;'n C A r,. C: 0 A. "'! ALASKA, INC. ~ F'.O. BOX i~0360 [ ANCHORAGE, ALASKA 995t REFERENCE' ARCO PRESSURE DATA -23 i G-3i-88 2-i 6 t ~-23-88 i-i 6 i ~-.-'o-oo S-i i i -i 8-i t '.'~'- 29'- 88 i 8-"' i ~)-23-88 F'WDWi-~ ii-5-88 BHP--$TATIC GRADIENT BHF'--STATIC GRADIENT BHP--$TATIC GRADIENT BHF'--FLOWING GRADIENT BHP--$TAT!C GRADIENT BHF'--$TATIC GRADIENT BHF'--$TATIC GRADIENT F'L. EASE SIGN AND REI'URN THE ATTACHED COPY AS RE-CEIP',r OF DATA. SALLY HOFFECKER .~~ . ,,, &$o~O;l~.O0~ll~$$[O~ ' TRANS ~88687 .~ APPROVED ~ ' ' DISTRIBUTION CEN I RAI_ F I I..E~', ~ ', ~..HEVI-,ON D &.M EX'FENS ! ON EXF'I_OF;.'.AT ! ON · .." EXXON MAF<ATHON -..'"' MOBIl_ ... PI"iI LLI F'S F'B WELL FILES F,' & D SA',~ FL; ,.?TAT. E OF ALASKA TEXACO ARCO ALASKA, TNr., ( PoD, RDX ,I ANCHORAGE, AI...ASk A 995t 0 DATE: REFERENCE:' ARCO CASED HOLE FTNAI. ~-_.t.=~'--- 4-22-88 '~-~2-3'- 4 -20-88 PR , PRFL. E/FM/TP/F D/Id Fl DMMETER PRO, PRFLE/FM/TP/FO/W PR'~ .. PRF[ E/HPFM/TFMP/hFN PRO, PRFL. F./HPFM/TEMP/DEN/MHIIT P.TTS'/TEMP CAMCO CAMCO CAMCn RAMCO CAMCn PTT£/CR/TEMP RI.IN 9, ,'5' PITS PITE/TEMP PITH FLOWMETER PITS/TEMP PRO PRFLE/HPFM/WHL~0iI&G~C°ns. ComII~S'g[~RIJN F'R~PRFL. E/HPFM/W~[~?~R ~chomg8 RUN CAMMA RAY RUN PRP.PRFL. E/HPFM PRD,PRFLE/$PIN/TEHP/WHUT IN,J,PRFLE/FM/TP INJ,PRFLE/HPFM/TEMP PITS/TEMP PRODUCTION PROFILE' . IN~,~.,,',,.,,~/W~,U, PR~ PRFL. E/$P ''~'/~' PRD,PRFLE/HPFM/GR/WHUT INJ~PRFLE/HPFM t~ 5m 4 ~ .5' RUN t , 5' RUN 4 ~ 5' RUN 4 ~ 5' RUN ~ ~ 5' RUN t , 5' RUN t , 5' RUN ~ , 5' RUN t , ~' CAMCO CAMCn CAMC~ CAMCO CAMCO CAMCO CAMCO CAM~n CAMCO CAMCO CAMCO CAMCO CAM~O CAMCO '-~-~,7-;& L~'25.-88 INJ,PRFLE/HPFM RIJN 4, 5" ~:: CAMCO PLEAXE SIgN AND RETURN THE ATTACHE~ COPY AX RECEIPT~.. RECEIVED BY ...... ~'~ ,u~-,::~1~ HAVE A NICE DA ' ' .... ~ ~,--, -.-- . ~,/,"~' TRAN~ ~eetes ~ // ~ ,_ ~~~ ~ / .... ............. ff/ - ' , C/NTRRL F~LEE e CHEVRON PB UELL.. D & M R & D ~ EXTENSION EXPLORATION ~ EAF'~ ~. EXXON MARATHON ~ TEXACO ~~ MOBIL ARCO AI_AgI~A: IN£ · P..O., .BOX t88J6~ ANCHORAGE: AI...AgKA DATE' ~-t ~-SI~l REFERENCE. ARCO 12,,AGED HOLE FTNAi_ P..FII..IL..AR .CIDI.. IL. AR./PERFITIRAT 1 ITIN COI._I..AR/PERFORAT I ON IT, OIL. I..AR/PERFORATICIN C .F!/.LAR/PERF .F!RAT I ON COIL. I.. AR/I:'ERFIDRATTON P.,O L. L.. AR/PERFFIRAT T. ON C.. 13 L L. AR/PERFFIRAT TI'IN COI..L.A R/PERFCt. RAT T ON C.n!.. L. AR/PERFFIRAT I ON IL';.. r!l...l... A R/PERFORAT I FIN C IT'IL. L. AR/PERFORAT .T CIN P:nl...I...AR .C. CII.. t.. AR/P .E'. RFnRAT T. rlN Cfll.~l.. AR/P .K. RFORAT .T ON RI.IN RI. IN RI.IN RI IN RI.IN RI..IN RI.IN RI. IN RI.IN RUN R!JN RI. IN RLIN RUN R.I.IN F'I...EA,~F ,~TGN AND RET r'~- ],,.a 0il & Gas. Cons. Commissi,,D ~ - Anch:rage RECEIVE][) BY HAVE ~ NIE PEGGY ~IENNETT ATO- 'i 5.,?9 DATA., TRAN,.~ ~88467 //~ AFFt;.OVED .'0 :r. ,~TR T RI IT T. :~ CENTRAl.. F I I...E,~ ~: P H I l...l....T. F',.-9 " ~ ' F'R WELl... FT.I..,F,.9 ~'"' i'., H E ',/R ON D & H R & T) · ,,.'"' EXTEN,~!ON EXF'I..I, IRATTFIN ,,'"' ,?APP. ~ .EXXON ~';~"""~"ZTATE"'OF '~t._AS'KA . · . MARATHON '5 TEXACO · ." MOBIL ARCO Alaska, Inc.( Prudhoe Ba~ engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 8, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1 Approval No. 7-378 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 13-1)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-(~ STATE Of ALASKA I~. ALA .A OIL AND GAS CONSERVATION CO .,SSION REPORTOF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of wellatsurface 2290' N & 56' W of SE Cr. Sec. 14, T10N, R14E, UM 5. Datum elevation (DF or KB) 74' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 13-1 At top of productive interval 1316' S & 1783' W of NE Cr. Sec. At effective depth At total depth 1097' S & 1890' W of NE Cr. Sec. 11. Present well condition summary Total depth: 14, T10N, R14E, UM measured true vertical 14~ TiON, R14E~ UM 10055 ' feet Plugs (measured) 9511 ' feet 8. Approval numbil~ 9. APl number 50-- 029-20323 10. Pool Feet Prudhoe Bay Oil Pool Effective depth: measured true vertical 9985 ' feet Junk (measured) 9444' feet Casing Length Size Structural Conductor 129' 20" Surface Intermediate. 2738 ' 13-3/8" Production 10033 9-5/8" Liner Cemented Measured depth True Vertical depth 167 Sx AS II 129' 6800 Sx AS II 2738' 1250 Sx C1 G 10033' Perforation depth: measured 9222-9240', 9326-9350'; 9360-9386'; true vertical 8734-9020' (6 intervals) Tubing(size, grade and measured depth) 4½", 12.6#, N-80; 5½", 17#, NPC tubing @ 9126' MD Packers and SSSV(type and measured dept~ Camco Bal-0 SSSV @ 2189', Baker SAB Packer @ 8993' MD 12. Stimulation or cement squeeze summary 9397-9413'; 9435-9475'; 9491-9529' 129' 2737' 9497' Intervals treated (measured) Attached Treatment description including volumes used and final pressure 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 3300 2970 5618 -- 300 Subsequent to operation 2000 1600 1333 -- 350 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15.1 hereby certify that the foregoing is true and correct to the best of my knowledge ~ ~ '~/~'" ~.7 Form 10-404 Rev. 12-1-85 WELLS/82 T. A. Billingsley, 265-6871 Submit in Duplicate DS 13-1 COILED TUBING UNIT CEMENT SQUEEZE WATER SHUTOFF 8/11/87 8/12/87 8/31/87 Pumped 12 bbls xylene pre-flush before cement squeeze. Pumped 76 bbls cement plus additives through coiled tubing. Obtained 1600 psi squeeze pressure but bled back to 800 psi. Held 800 psi for 30 minutes. Contaminated cement in wellbore. Jetted out contaminated cement. Perforated: Ref. BHCS 11/23/78 9222-9240' 6 spf 9326-9350' 4 spf 9360-9386' 4 spf 9397-9413' 4 spf 9435-9475' 4 spf 9491-9529' 4 spf Flowed well. WELLS/82 ARCO ALASKA, IN~. P.O. ~OX ~e~e ANCHORAGE, ALASKA 995te DATE: 2-~7-8B REFERENCE: ARCO CA£ED HOLE FINAl_ t-t5 t-2t-88 t -22-88 7-28 2-t (~-88 PWDWi -t 2-8-88 PRD,PRFLE/FM/TP/FD/W PRD,PRFL. E/HPFM/WHI. IT CBL TEMPERATURE/SPINNER SURVEY RIJN i, 5' RI. IN t, 5' RIJN t , !5' RUN t, 5' PLEASE SIGN AND RETURN THE ATTACHED COPY RECEIPT OF DATA, RECE)VED BY ......... l~_x_/~__~._ ~v; ( 7 HAVE A NICE DAY! '~~;(~ ... ~TO- ~ 529 TRAN$ ~88ie7(-~ APPROVED .... ~ .................. DI£TRIBI.)TION CAMCO CAMCO £CH CENTRAL. . FII...E$ CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIl_ ARCO AI_A~KA, INC, P,O. BOX ~9~68 ANCHORAGE, ALASKA DATE: 2-t 6-88 REFERENCE: ARCO CASED HOLE FINAl_ i-4 i-22-88 PR , PRF'I...E/FM/TP/FD/W RI.IN '1 -'i 3; i --.. ,..-OR Fi.. OWHETER RI IN t-t 6 ~ -2~ -88 PRD.PRFLE/FM/TP/FD/W RUN ~ -t 9 ~ -28-88 PRO., PRFL E/HPFM/TFMP/DFN RI. IN ~ -2:3 t -28-88 PRO, PRFI..E/HPFM/TEMP/DEN/WHI.IT RUN ~ -23; ~ -24-88 P.T T..~/TEMP RI. IN 4-7 2-4-88 Pl[ TE/C.,R/TEMP RI.IN 4-~ R 2-3-88 P .l' T,t" RUN 4-22 ~ -29-88 F'IT,~/TEMP RUN 7- t ,.'7[ :2.-5-88 P .T. T,~ RI. iN 9-:3;4 ~ - 2,'"J- 88 FLOWMETER RIJN t t -~ 8 ~ -,."J~-88 PITE/TEMP RUN jm~ t -24-88 PRO, PRFI_E/HPFM/WHUT RUN t 3;-5 ~ -2~-8R PR:D, PRFI..E/HF'FM/WH[ IT /(',R RI. IN ~ ,'3;-t 7 ~ -2~-88 GAMMA RAY RUN ~3;-28 ~ ~.~ 88 PRI) PRFLE/HPFM RUN ~4-22 ~-27-88 PRO , PRFLE/$PIN/TEMP/WHUT RUN t 6-2 t -,:5-88 -IN,.J PRFLE/FM/TP RUN t 6-5 t -28-88 IN J, PRfI_E/HPfM/TEMF' RUN ~ 6-~ ~ 2-t-8:8 P][T,~:/TEMF' RUN t 6-t 9 t -28-88 PRODUCTION PROFILE RUN t 6-28 t -2.g-88 PRD, PRfl...E/,.~F'IN/TEMP/GR/WHUT RUN t 7-2 t -~t -88 PRD ~ PRfL. E/HPfM/GR/WHUT RUN f 7-8 ~ -25-88 ]:NJ, PRFL E/HPFM RUN t ?-t ~) t -25-88 INJ, PRfLE/HPfM RUN PLEASE $.I[GN AND R.E-.T~.' '/~~?,,:~ ' "_ ':; ,;."~~P~~'~~ AS RECE,TPT OF DATA., ~'.ECE I VE:D B Y~___~_--:~ --. -., ..... _,.__. HAVE A ~AMCO ~AMCO CAMCO CAMCO CAMCO CAM~n CAMCO CAMCO CAMCO CAMCO CAMC, O CAMCO CAMCO CAMCO PEGGY BENNETT AT0-t529 TRAN~ ~88i~5 APPROVED D~£TRI~I.ITION CENTRAl, FII_EX CHEVRON D & M EXTEN£ION EXP[..ORAT~ON EXXON MARATHON MOBIl_ ,-=' PHI i_1._ .l: P,S' PE~ WELL FTL.E,~ r & D ,-=' XTATE Of AI..A.S'KA '"... TEXACO ARCO AI. aska, F'. O. Box Anchorage, Alaska 995:'18, DATE: t~-t8-87 REFERENCE: ARCO Cased Hole Final. -t ~-87 -~ 8-87 -7-87 Casing Col. Iai- [..og/CI,T Tempera~ ~re Log Temperature L. og RuI3 t , ..5" Run 2, 5" Run ~ , 5" PI. ease s Received HAVE A N Peggy Be AT0--~529 igl~ and return the attached copy a~,~r-~eceipt of data, I CE DAY (Ala~/ka Oil & Gas Cons. Commiss[ot~ nne t $ ~ ~ch0rage TRANS ~8 Approved D I,..k"TR I BI.IT I ON ,~ch $ch Sch Central. Fi Les ~ F'hi tl. ips Chevron F'B Wel. [ Fi I.m..~ Ii& M R& D Exfension Exp [orat' i on ~ ,~AF'C Exxon ~ ,~tate of ALask~ Marathon ~ Texaco Hob i [ ARC. fl A [a..~ka, .Thc, P,.O. Box te03.6e Anchorage, A la.~ka 99.5t G DATE: tt,9-87 REFERENCE: ARCO Cased Hole Final. $ -3 9-5-87 Co ! I ar t -7 8-22-87 Co I tar t-t t 7-t t-87 Col lar t-t 2 7-t t-87 Col Lar t-2G 7-t t-87 Col 2-t 2 7-22-87 Co I. tar 4-22 7-24-87 Co 5-4 8-2t -87 Co I. tar 5- ~ 3 7-26-87 Co I I n r 5-t 7 9-23-87. Ver~ i t 6-7 7-~ 2-B7 7-~ t 7-~ ~-87 Co I. I. ar 9-2 t 8-t 5-87 Co 9-~4 8-2t -87 Co I. I.~r t t -26 7-~t -87 Co t ~ -27 6-22-87 Co I. I. ar t ~-27 7-3~ ~87 Col lar t 2-8B 9-~-87 t2-t5 9-2-87 Collar t3-t 8-3t-87 Cot t 3-t e 9-3-87 Ca I. tar t3-~4 8-t 7-87 Col (Perforation log) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation Log) og (Perforation Log) (Perforation Log) (Perforation Log) (Perforation [.rig) (Perforation Log) (Perforation Log) (Perforation Log) (Perforation'Log) (Perforation Log) (Perforation Log) (Perforation Log) Pteaze sign. and return the a_t.tar, bed copy as receip v ........ ~cb0rage Peggy ~enneff RTO- ~ TRAN$ eB76e& ~ Approved DISTRIBUTION Run Run Run I , 5 · R~m Run t , 5" Run ~t, 5" Run 't , Run Run Ru~ t , 5" Run I, 5" Run Ru.n Run Ru~ Run t , 5" t'.of data,?" Atlas Atlas Atlas Atlas At la.~ Atlas At la..~ At I.a.~ At la..~ At I.a.~ Atlas Af la.~ At I. nz Bf I~.~ ~f In.~ Central. Fil. e~ Chevron D&M Extension Exploration Exxon Marathon Mobil.. Phi I. I. i p..w PB We[ I Fi R & D SAPC ,~tate of-At.a.zka~ Texaco ARCO ALa.ska, Inc~, F'. 0 ~ Box t Anc.'hor ~ge, 99..5. i 0 [)ATE: t 0-27-87 REFERENCE: ARCO F're.s.sure D,~ 't a t S--.i 4 8-2'?-87 t 3-J 9-30-87 Static graclient S '!' a 'i' i c B o t- '1' o m H o !. e F' r e '.:.'.s u r e C..'a m c o ri't- i .s I::'l. ea.se ..~ign and re-l:urn 1;he at'l:ac:hed Received By ............................................ I..IA ¥ E A N I Cli..". D A Y ! R e c o r' d .s' F:' r' o c e...'..,'.'...~ o ,," A'I" 0 .... -~ 57.'. 9 'I'RAN,? .,-,., ..... :.. [ 'd A p P I" .r.! V e d .............. ..~ .............................................................. l) '1: ,., f I.,, .I.l.:.: ! .I 'f' '1:0 N c:opy a..g re.r.:ejp'l: of data,. Naska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc, P,O, Bo× ~00368 Anchorage, Alaska 995~ DATE' 9-25-87 REFERENCE' ARCO Cazed HoLe Final 4-t 8-46-8? Production F'rofi [e Run t, 5" Camco t-8 8-22-87 Inject ion Profi[e Rtt~ t, 5' Cat,~co t-5 8-28-87 F'roduc~ion F'rofi le Run t, 5" Camco 4....5 8--2~-..8'~ Production Profile Ru~ i, 5' Camco 4-2 8-24-87 F'roduction F'rofi[e/F~uid Den.s. Run ~, 5" Camco ~4-~7 8-28-87 F:'rodu. c~io~ F'rofi te Ru~ ~, 5" Camco S3-.6 ~-$8-87 Injection Proft[e Ru~ ~, ~' Camc:o ~--28 ~--~6-8'7 F'ump-.Zn l'empera~ure Ru~'~ ~, 5" Cahlco 5-5 ~--9--87 Production Profi[e Run ~, 5' Camco 5-- ~ 6 8- 23 *.-8'Z C C L R u n ~, 5 ' C a m c o $3-J 9-~9-"87 Pump-In T emperafure Run ~, 5" Camco 3..2~:l 8-2:3-87 Leak be¢ec¢ion Run J, 5' Camco NGI.-.~2 9-~5-87 48 Arm In~pecfior~ Caliper Run $, 2" Camco 1t-'-25 9 .... t2--'8'7 F:'roductio~ F:'rofi Le R~z~'~t, 5' Camco 3.-9 8.-29-.-87 PITS' Run ~, 5" Camco F:'l. ease sig¥~ and r'e~'~rn 'the at'tacheci copy a~' rec:eip~ of data. "., eived B" R ~ A lAVE ..... SE R e c o r d .~ F:' r' o c e.s s o r ~ 07 .... A T 0-.. ~ 529 ~ /Alaska 0il & Gas Cons. Commission . / / Anchorage TRANS' :l~F~',498 ~ D :[ ,? T R I B I.l T I 0 N .IL ,11. · ,,. C e ~"~ ~ r a L F' i I. e s ,~ F:' h i i. I. i I:-' -~ ~ r:hev~'o.,,'~, F'.fi-: W.e,. I. I. F'i I. ¢.:.:,:~' I) & Pi I:~'. & .ltl · .'I~ E x 'f e-- ~'~.,,~" i o I'~ E x p t o r a t' i o n ,, '"'.,,. ..?. A F:' (:.'. 4~ Exxo'n ... "S.ate of Ata.'~ ~ T E~ × ~:.1 c 0 . H a r' a '!' h o n II. · ,,.. f'tobi L ARCO Alaska, I~_ Prudhoe I~ay"~.,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 14, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1 Permit No. 7-52 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/PVL/jp Attachment cc: Standard Alaska Production Company Pi(ps 13-1)Wl-3 WELLS/47 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-(D REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate ~ Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, AnchoraKe, AK 99510 4. Location of well at surface 2290' N, 56' W of SE Ct. Sec. 14, TION, R14E, UM At top of productive interval 1316' S, 1783' W of NE Cr, Sec. 14, TiON, R14E, UM At ef~fective depth 1145' S, 1866' W of NE Cr. Sec. 14, T10N, R14E /~tgt7°~t a 'sd, e P]~~ 1 90' W of NE Cr, Sec. 14, T10N, Ri4E, UM 5. Datum elevation (DF or KB) 74' REB Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 13-1 8. Approval number 7-52 9. APl number 50-- 029-20323 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 129 ' Surface 2738' Intermediate Production 10033 ' Liner Perforation depth: measured 10058 feet 9521 feet 9897 feet 9368 feet Plugs (measured) Junk (measured) Size Cemented 20" 167 Sx 13-3/8" 6800 9-5/8" 1259 Sx 9326-9350'; 9360-9386'; 9397-9413'; 9435-9475'; 9491-9529' true vertical 8831-8862', 8862-8887', 8897-8912', 8933-8970', 8985-9021' Tubing (size, grade and measured depth) 5½", 17#, N-80 w/ 4½" 12.6# N-80 @ 9126' Packers and SSSV_(tvpe and measured depth) BTO packer @ 8993 , Camco Bal-O SSSV @ 2189' Measured depth True Vertical depth 129' 129' 2738' 2738' 10033' 9497' 12. Stimulation or cement squeeze summary Intervals treated (measured) At t ached Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments Daily Report of Well Operations [] C°pies °f L°gs and Surveys R~'~L ~'~'-- ~-?i 15. I hereby certify that the foregoing is true and correct to the best of my knowledge /~-- Signed Title Operations Engineering Manager Form 10-404 Rev. ,12-1-85 WET,LS/47 P. V. Lantero, ATO-1504, 263-4312 Submit in Duplicate(~, DRILL SITE 13-1 SCALE INHIBITOR TREATMENT PROCEDURE The scale inhibition treatment planned for DS 13-1, Approval No. 7-52, has been cancelled. WELLS / 47 ARCO Ala:ka, :[nc. /: ~ P.O. Box i80360 t[ Anchorage, Alaska 995i0 DATE: August i2, i987 REFERENCE: ARCO Ca zed Hole Final t-iA 5/9-i~/87 Pu~np in Temp. Log 6-t5 8-5-87 CCL/F'erf, Record t~-t 8-6-87 CCL/Perf, Record Please ~ign and return fhe affached copy as receipt of dafa. Anohorag~ Apl:~roved ............................................ '- D I,S'I'R I BUI'I ON Received By ........................................... HAVE A NICE DAY! Ro~a~e Peek A'¥0-~529 · ,,-'"' C e ¥~ t r a I F i I e .s -"'.,,. F'h i l I i p s · "'Chevro~'~ PB We[ [ Fi les I) & M R & ~ '"' '"' ,Toh i 0 · ,. E x T e n s i o)') E x p [ o r a t i o~'~ .,- "" E x x o )'l .,,. .,. $'l:.ate of Alaska Hara thon '"'.,,- Texaco ~,; Hob i l ARCO Alaska, Inc~' Prudhoe B~i:~ ,-ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 16, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1 Permit No. 78-60 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referencedwell. Very truly yours, D. F. Scheve DFS/TAB/jp Attachment cc: Standard Alaska Production Company PI(DS 13-1)W1-3 RECEIVED JUN 1 8 1,987 WELLS/82 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA AL ,,A OIL AND GAS CONSERVATION CO ,v~ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate J~ Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 2290' N & 56' W of SE Cr. Sec. 14, T10N, R14E, UM At top of productive interval 1316' S & 1783' W of NE Cr. Sec. 14, T10N, R14E, UM At effective depth At total depth 1097' S & 1890' W of NE Cr, Sec, 14, T10N, R14E, UM 11. Present well condition summary Total depth: measured 10055' feet Plugs (measured) true vertical 9511 ' feet 5. Datum elevation (DF or KB) 74' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 13-1 8. Permit number 78-60 9. APInumber 50-- ri?q-20323 lO. Pool Prudhoe Bay Oil Pool Effective depth: measured 9985 ' feet true vertical feet 9444 ' Casing Length Size Structural Conductor 129 ' Surface Intermediate 2738 ' Production 10033 Liner Perforation depth: measured Junk (measured) Cemented 20" 167 Sx AS II 13-3/8" 6800 Sx AS II 9-5/8" 1250 Sx Cl G Measured depth True Vertical depth 129' 129' 2738' 2737' 10033' 9497' 9326-9350'; 9360-9386'; 9397-9413'; 9435-9475'; 9491-9529' true vert~cal 8830-9020' (5 intervals) Tubing(size, grade and measured depth) 4½", 12.6#, N-80; 5½", 17#, NPC tubing @ 9126' MD Packers and SSSV(type and measured depth) Camco Bal-0 SSSV @ 2189', Baker SAB Packer @ 8993' MD RECEIVE1) JUN 8 1987 0it & Gas Cons, CoremL~ 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sk~ 13. Estimated date for commencing operation September 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereb~,?ertify thaJ, lth~fore~oing is true and correct to the best of my knowledge Signed ~¢~/~~~~ Title Operations Engineering Manager Date Conditions of approval Commission Use Only Notify commission so representative may witness [ Approval No. [] Plug integrity [] BOP Test [] Location clearance| Approved by ~ '--~PZ by order of Commissioner the commission Date ~,- /'o~>--~' Form 10-403 Rev 12-1-85 WELLS/82 Submit in triplicate DS 13-1 CTU SQUEEZE PROCEDURE 1. Pull SSSV. Tag PBTD. Last PBTD was 9886' on 3/25/87. 2. Flow well to achieve drawdown. Perforate squeeze perfs 9226-9240' (Sag River) at 6 SPF. (Ref. BHCS 11/23/78) 3. Flow well to clean up squeeze perfs. 4. RU coiled tubing unit. Fluid pack 5~" tubing. 5. Pump 80 bbls cement down CT. 6. Pressure up on squeeze to 5200 psi BHP and hold for 1 hour. 7. GIH contaminating cement to PBTD. Slow]y bleed pressure while contaminating to leave a minimum of 200 psi differential into the formation. 8. Jet out contaminated cement to PBTD. POH and freeze protect. 9. Wait at least two weeks before reperforating. 10. Nitrogen lift top 2000' of fluid for drawdown during perforating. 11. Perforate original Zone 4 interval: (Ref. BHCS 11/23/78) 9326-9350' 24' 4 SPF 9360-9386' 26' 4 SPF 9397-9413' 16' 4 SPF 9435-9475~ 40' 4 SPF 9491-9529' 38' 4 SPF , , 144' 12. Test well. WELLS/82 1. 5DDD PSI ?" WELLHEAD CONNEC10R t'LANG£ ~. 5DDD PSI WlR£LINE RAMS (¥ARIABLE SIZE) ,.%.5000 PSI 4 1/6" L UBRICA'I*OR 4. 5000 PSi 4 1/6" FLOW *I'UB£ PACK-Orr 2 RECEI /EI) JUN 1 8 1987 0il a Gas Cons. Commission Anchorage H]RELINE BOP EOUIPHENT 5 4 3 2 1. 5000 PS1 ?" WELLHEAD CONNECIOR FLANGE 2. 5{)00 PSI 4 *1/*16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 50C)0 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PS! 4 1/16" STUFFING BOX COILED TUBING UNI1 BOP EQUIPMENT II III I IIIII I ARCO Alaska, Inc· F'.O· Box Anchorage, Alaska 995t0 DATE' Apri L~, n ~987 REFERENCE: ARCO Cased Ho£e Final 1t-5 3-2t-87 Pump In Temp, Survey Run t3-~ 3-25-8'7 Pump In Temp. Log Run t~-6 ~-25--87 In.j, F:'rofi le Run t, 5" t3-t6 3-26-87 In j, F'rofi [e Run C8 ~mic o Ca mc o Ca ~flc o Ca ~nc o F:'l. eas'e s i gn and re'l:ul t;a, Received 7: = '";.,: .... By.~ /~ C~ U0n$, Coinmkssioil I-.I A V E A N I C E D A Y ~ Anoh0r~D.e Ros'anne F~ek A'T'O.- ~ 529 'lri:~:AN,S' :',,':87t 99 ~ A p p r' r) v e cJ I) I S T R I B LJ l' I 0 N · ..'"' Phi I. I. ip s' F:'B WeI. L I=i Les' I:;-.' & I) · ,~',~.~ o h i o ~'~,.,S'~',ate of ALa~.:ka.. '"".''J" e X 8 C 0 ARCO Alaska, Inc.# {~' Prudhoe Bay~',-,~gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 21, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 13-1 Permit No. 78-60 Dear Mr. Chatterton: Attached is the "Intention" Sundry Notice detailing work to be performed on the above-referenced well. Very truly yours, D. F. S cheve DFS/PVL/jp Attachment cc: Standard Alaska Production Company PI(DS 13-1)W5-4 RECEIVED JAN 2 1987 Alaska 0il & Gas Cor~s. Commission Anchorage WELLS/47 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate ]~ Pull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator ARCO Alast~3, Inc. 3. Address ?. O. Box 100360, Anchora~e~ AK 99510 4. Location of well at surface 2290' N, 56' W of SE Cr. Sec. 14, TiON, R14E, UM At top of productive interval 1316' S, 1783' W of NE Cr, Sec. 14, TiON, R14E, UM At effective depth 1145' S, 1866' W of NE Cr. Sec. 14, T10N, R14E At to;al depth 1097 S, 1890' W of NE Cr, Sec. 14, T10N, R14E, UM 11. Present well condition summary Total depth: measured true vertical 10058 feet 9521 feet Plugs (measured) 5. Datum elevation (DF or KB) 74' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 13-1 8. Permit number 78-60 9. APl number 50-- 029-20323 10. Pool Prudhoe Bay Oil Pool Effective depth: measured 9897 feet true vertical 9368 feet Junk (measured) Casing Length Size Structural Conductor 129 ' 20" Surface 2738 ' 13-3/8" Intermediate Production 10033 ' 9-5/8" Liner Cemented Measured depth ~ue Verticaldepth 167 Sx 129' 129' 6800 2738' 2738' 1259 Sx 10033' 9497' Perforation depth: measured 9326-935-'; 9360-9386'; 99397-9413' true vertical 8830-9020' Tubing(size, grade and measured depth) 5~", 17#, N-80 w/ 4~" 12.6# N-80 @ 9126' Packers and SSSVIWpe and measured dept~ BTO packer @ 8993', Camco Bal-O SSSV @ 2189' ; 9435-9475' ; 9491-9529' RECEIVED JAN 2 ] 1987 Alaska 0il & Gas Cons. Commission Anchorage 12.Attachments Description summary of proposal ~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation January 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby_certify th~ th.e for.e,,go'mg is true and correct to the best of my knowledge Signed Commission Use Only Conditions of approval Approved by Date y~,//,~,~ Notify commission so representative may witness [] Plug integrity [] BOP Test J Approval No. [] Location clearance Ap~rc~',,~d oF,,~ - ....................... ..==~ by order of . __ / ~ ~onDate ' Commissioner the comm'ss' Form 10-403 Rev 124-85 WELLS/47 P. V. Lantero, ATO-1504, 263-4312 Submit in triplicate DRILL SITE 13-1 SCALE INHIBITOR TREATMENT PRELIMINARY PROCEDURE · me Be e MIRU pump truck and transports. Treat well as follows: a. 2000 gals of (Na2) EDTA solution b. 8190 gals of amine phosphonate inhibitor c. 1000 bbls of diesel d. Displace diesel to formations with crude Shut well in for minimum of 12 hours. RD and release equipment. Return well to production and obtain new capacity. RECEIVED JAN 2 1987 Oit & Gas Cons. Commission Anchorage WELLS / 47 A'n,.':: h o r a g e: A ~ a :~ k a C a file 0 D ]: $ 'f' i:;.'. :i; B U 'T' ;I; 0 N A n c I'1 o I" a g e, A i. a .'.-.~' I..'. a 9?.5 t (:.) DATE;: Noveml')e~" 2 t, t986 R E I::' Iii: R E N C E: A R C 0 M a r.j n e 't' i c '1'' a p e s' w / I. i .'.-7 'f i n g 'i :3-. t i 'l - t 4-86 f'i a g + a p -' '"' '"' '') "'7 C , . t.:... ,' ,.-..,,-,, 'l H C N i... F:' i. e a ~: e .'..i: i g ri a n d i"e't'ur'l'i 't'l'le a't"t'ached copy a.'::,' 'r'eceip'l.' o'f d a 't' a., F;.'. e c e i v e d B" I'.1AV iii: A N I C'.li!: D A Y ! 'T'i:::ANS ~:8676.'.3 D I $ "1" F.'. I B U T I 0 N · ,,.C e ¥'~ 't' ¥' a t. F i I. e ~r C h e v 'r' o 'n D & M E x t e'n s i o n E x p 1. o I" a -I: i o'n · '" E x x o °i1' .. M a 'r' a 't' h r-, n i'i oi::, i 1. ARCO ALa,-~'ka, Inc. F'.O. Box t OOS6O Anchorage, A L a_.?l< a 99~t0 DATE' November ~ 8, ~986 REFEREN[;E' ARCO Cased Hole F'ina[ Run S, 5' ~-,c'"'h Run 2, 5.' ..,*'ch Run 5, 5" :;ch Run t, 5" .~ch PLea.se s i'gn and ret'urn the Received By_ HAVE A NICE Rossnne Peek ATO-I 5:29 DAY! at tached DISTRIBUTION. ,~ Central F'i [e:~ ~.'" Chevron D & M ~'~ Exten.sion ExpLo'ration '~' Ex xon Maratho'n -~'"' Mob i 1. copy as receipt of data, R & D ~:,,~ ..... $,oh .i o ..... -~,/r ;-'$:t:a ::t e:!;, 'o f A I. as-l: a ~: Texaco ARCO Alaska0 Inc. Anchorage0 Alaska DATE:JuLy t0 ,t986 REFERENCE' ARCO Pressure Data '--4-2t 6-t5-86 Static Gradient Camco --'4-22 6-16-86 Static Gradient Camco --t~-t 6-26-86 Static Gradient Camco ~1~-~ 6-26-86 Static Gradient Camco ---t5-4 6-29-86 Static Gradient Camco -"-4 ~-1 2 6-27-B6 Static Gradient Camco -'"~ 5-27 6-23-86 $~at ic Gradient Camco -'-!4-5 6-27-86 Static Gradient Camco --t4-5 6-3~-06 Static Gradient Camco ~t4-7 6-27-86 Static Gradient Camco ~t4-8 6-29-86 Static Gradient Camco '--14-9 6-29-86 Static Gradien~ Camco ~t5-~ 6-~e-86 Static Gradient Camco ~5-t~ 6-3~-86 Static Gradient Camco PLease sign and r~~ached copy as receipt of data. Re C HAt/" A .~P~"DAY! ' --: . .._ ~ ~ Linda HuLce ATO-t 5~9.. TRANS ~86424 DISTRIBUTION Central F i Chevron D& M Ex~ens i on Exp torat i on Ex xon Marathon Mob i L Phi llips PB Well Fi lex R & D $oh i o $~ale of Alaska Texaco ARCO Alaska, Inc.j Prudhoe Bay P..,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager February 25, 1986 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re- DS 13-1 Permit No. 78-60 Enclosed is the Completion Report for work done on the above-mentioned wel I. Very truly yours, D. F. Scheve DFS/SKAD/jj Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 13-1)Wl-3 RECEIVED FEB27 ~ 011 & Gas Colts. ARCO Alaska, Inc. is a Subsidiary ol AtlanticRichfieldCompany ALASKA ~_ AND GAS CONSERVATION CO( /IISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG _, .- 1. Status of Well Classification of Service Well OIL [~][ GAS [] SUSPENDED [] ABANDONED r-] SERVICE [] ..... 2. Name of Operator 7. Permit Number ARCO Alaska~ Inc. 7~-§0 3. Address 8. AP! Number Post Office Box 100360~ AnchoraKe~ AK 99510 50- 029-2032_% 4. Location of well at surface 9. Unit or Lease Name 2290' N, 56" W of SE cr, Sec. 1/+, T10N, R1/+E, UM Prudhoe Bav Unit At Top Producing Interval 10. Well Number 1316' S, 1783' W of NE cr, Sec. 1/+, TiON, R1/+E, UM ~R 13:1, At Total Depth 11. Field and Pool 1097' S. 1890' W of NE cr. Sec. 1/+. T10N. R1/+E. UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) ' ] 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 74' RKBI ADL 28315 · 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 11/08/78 11724/78 32/02/78I N/A feet MSL 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey i 20. Depth where SSSV set 21. Thickness of Permafrost 10058'MD,9521'TVD 9897'MD..9368!TVD YES~]. NO []I 2195' feet MD 1900' (approx.) 22. Type Electric or Other Logs Run DIL/SP, BHCS, FDC/CNL/CAL/GR, GR/C~TL/CCL 231 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 9M~Welde H-40 Surf 129' 2M' 167 sx Arctic Set II' cmt 13-3/8" 72#butt N-80 Surf 2738' 17%" 6800 sx Arctic Set ~I cmt 9-5/~" /+7~butt N-80& Surf 10033' 12~ 1250 sx Class G cmt S00-95 , ,, 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIXE DEPTH SET (MD) PACKER sET (MD) .... 5~" 9126 ' 8998' 9326-9350'MD /~ spf 9360-9386 'MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9397-9/+13 'MD ..... 9/+35_9/+75 ,MD DEPTH INTERVAL (MD) ,AMOUNT & KIND OF MATERIAL USED 9/+91- 9529 ' MD 8830- 9020 ' TVD , Ref: BHCS 11-23-78 N/A 27. PRODUCTION TEST Date First Production I Method of operation (Flowing, gas lift, etc.) 05/18/79I Flowing Date of Test Hours 'l:'ested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 01/26/86 /~.2 TEST PERIOD I!~ 1380 1/+53 2/+3 60I 1053 Flow Tu'bing ' ' Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. /+17 N/A 24-HOUR RATE 7887 8302 1390 28.1 28. ' .... CORE DATA ' , · , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NIARECEIVED FEB27 1986 Alaska 011 & Gas Cons. Celmt'dsslon Anchorage , .... Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate G'EOLOGIC MAF~KERs .~ ~i? ..... ' ..... ~ , ~. -. . . 'F oi~:M AT I 0 N'~_ ES~:S . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 9322' 8819' O/W Contact 9614' 9100' Base Sadlerochit 9916' 9378' 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Operations Eng. Mgr. INSTRUCTIONS General' -This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. .Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for on, IT the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). . "~ 7~ ', ~ ~ -~ "".,, i:' Item 23: Attacl~ed' supplemental records for this well should show the details of any multiple stage cement- lng and -the location of-the cementing tool. Item 27'~ Met od of Operation' Flowing, Gas Rod Pump, Hydraulic Pump, Submersible, Water ln- '~ .-~-,~,~::,, ?:2 .:r~ ,.~ '. ,.' ' . . .... . · Lift, jection, 'GAS..;,,..,:! nject'iof~',, ,~'.,. Sh6't-i'h, Other-explain.' Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. { Prudhoe Bay r-ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager February 25, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton- Re: DS 13-1 Permit No. 78-60 Enclosed is the "Subsequent" Sundry Notice detailing work completed on the above-mentioned well. Very truly yours, D. F. Sc~'~ve ~ l~-~. DFS/SKAD/jj Enclosure cc- SOHIO Alaska Petroleum Co. File PI(DS 13-1)W1-3 RECEIVED FEB 2 ? ]986 Alaska Oil & C~s Cuns. (~amnbaion ARCO Alaska, Inc. is a Subsidiary of AtianticRichfieldCompany STATE OFALASKA (r ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL E~X OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 78-60 3. Address 8. APl Number P.0. Box 100360, Anchorage, Alaska 99510 5o- 029-20323 4. Location of Well 2290'N, 1316' S 56'W, of SE cr Sec. 14, TION, R14E, UM (Surface) , 1783' W, of NE cr Sec. 14, TION, R14E, UM (Top Pr( 1097' S, 1890' W, of NE cr Sec. 14, TION, R14E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) 1 6. Lease Designation and Serial No. 74' RKB [ ADL 28315 12, 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number d) DS 13-1 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) {Submit in Duplicate) Perforate [] Alter Casing [] Perforations {~X Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: RePort multiple completions on Form 10-407 with a submitted Form 10~407 for each completion,) Pool 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 01/25/86. RU perforating unit and pressure tested equipment. RIH w/gun #1, shot interval 9366-9386'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH w/gun #2A and gun #2B, shot interval 9360-9366'MD (4 spf) and shot interval 9346-9350'MD (4 spf), opened well to cleanup. Shut-in well, POOH, all shots fired. RIH w/gun #3, shot interval 9326-9346'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. Ran SSSV, secured well. RD. Ref: BHCS 11-23-78 RECEIVED FEB2? 1986 Ala.ka ~il & 6as Cons. ~l.~al~l~ 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed~0~J~_~,~~--'~)~, ,~ed~_ Title_ Operations Engineering Mgr. The space below for Commission use Conditions of APproval, if any: BV Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. [ Prudhoe BayEb,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 13, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re:~,~.~ DS 13-2A DS 13-3 DS 13-4 DS 13-5 DS 13-8 DS 13-12 DS 13-13 DS 13-14 DS 13-26 DS 13-29 DS 13-30 DS 13-33 DS 13-34 Permit No. 78-60 Permit No. 83-21 Permit No. 78-62 Permit No. 78-63 Permit No. 81-103 Permit No. 81-148 Permit No. 80-142 Permit No. 82-178 Permit No. 82-171 Permit No. 82-74 Permit No. 83-43 Permit No. 82-101 Permit No. 82-106 Permit No. 82-136 Enclosed are the "Intention" Sundry Notices detailing work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS:BSM:vh Enclosure RECEIVED cc: SOHIO Alaska Petroleum Co. File PI(DS 13-1)W1-3~ P1 (DS 13-2A) W1-3 Pi(DS 13-3)Wl-3 P1 (DS 13-4)W1-3 Pi(DS 13-5) Wl-3 P1 (DS 13-8) W1-3 Pi(DS 13-12)Wl-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany Pi(DS 13-13) Wl-3 Pi(DS 13-14)W1-3 P1 (DS 13-26)Wl-3 P1 (DS 13-29)Wl-3 P1 (DS 13-30)Wl-3 PI(DS 13-33)Wl-3 P1 (DS 13-34)W1-3 STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 78-60 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell Surface: 2290'N & 56'W of SE cr Sec. 14 T10N, R14E, OM At Top Producing Interval: 1316'S & 1783'W of NE cr Sec.14, T10N, R14E, UM At Total Depth: 1097'S & 1890'W of NE cr Sec. 14, T10N, R14E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 74' RKB 6. Lease Designation and Serial No. ADL 28315 8. APl Number 50-- 029-20323 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 13-1 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate l~X Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate well 13-1 at selected intervals within the Sadlerochit sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator tested to 1.5 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and cleanup operation. Proposed Perforation Intervals: 13-1 9326-9350' MD 9360-9386' MD Ref: BHCS 11-23-78 RECEIVED JAN 1 1986 Oil & Gu Oons. Oomi~im 14. I hereby j-,Artify that the foregoing is true and correct to the best of my knowledge. Signed ~//~ ~~ Title Operations Engineering Mgr. The space below for Commission use Date Conditions of APproval, if any: Approved Copy Returne~ ORIGIIIAL Utl[I~ ~ BY I[~N,?li£ C. $1~ITi" ~,,, Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, In~(~ Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: February 22, 1985 Reference: ARCO CH Finals / ~-~ ~5-8 CNL/GR Epilog /13-1 CNL Epilog Spinner Fluid Density Run 1 5" - - DA 1 5" GO 1 5" GO 1 5" ~ 1 5" 11-19-84 DA'~ 4 5" 8-31-84 Sch ign and return the attached copy as receipt of data. . t' Received by Pam Lambert ATO 1429C Tran s~)~L/ Cons. Chevron D & M Expl. Services. Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco , ARCO ALaska, Inc F'~O. Box Anchorage, ALaska 995 t 0 DATE: £eptembe'r ~S, ~984 Ri!i;FEF~ENCE: ARCO Magnetic Tape w/lis'ting · ),:' ~,<0 N i :? 0 I-.I I 0 -.. / /~l.e,.'a:.;e :~'Jgn and 'J C 0 P y 1" e ti' ti l' l:; r e v i o tJt.S' 1. y ...'...' e n .I.. 1:'., y ,~-.:.' c: h I. ~.t m b e'r g e'r ,. · t: h e a .1: -.i: ,..:! c h e d c: o p y ¢'..'~ :~; 'r'e c e i p t o f d a f a ,. D I ,?;' 'l" R I B U T I C.'l N ( o n !. y 01-.! ) Ch e'v'r on E x p L o'r .;.~ '!: i o n ,S' ce r v i c: e s' E x .t.- e n s i o n E x i::, !. o r a t i c-', n Ex xon C; e '!.' .l..y M a r a t h o n Hob i L Hobi L I::: & f:' F'hi LLips F:"rudhoe Bay We L L i-? & D ,?oh Jo ;~+.ate of ALaska F:'i Les' (NC) An'.~'wer ) ARCO Alaska, I~( ~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 1, 1984 Reference: ARCO Cased Hole Finals D.S. 3-6~' 6-10-84 Diff Temp D.S. 3-19---- 5-25/26-84 Spinner Survey D.S. 3-22- 6-29-84 D.S. 6-10f 7-4-84 D.S. 7-3--- 7-6-84 D.S. 7-18--- 7-4/5-84 D.S. 7-24' 4-19-84 D.S. 9-18--- 6-21-84 D.S. 12-15~-'~ 4-13-84 Spinner Survey Temp Log Temp Survey Spinner Spinner Diff Temp Spinner D.S. 12-18- 4-14/16-84 Spinner D.S. 13-1 / 6-17-84 D.S. 13-10''~* 6-22-84 D.S. 13-12-~ 6-18-84 D.S. 13-13"~5-31-84 D.S. 13-16J .... 4-12-84 !/_~r-~_ ~.S. 13-27'//'~ 6-2-84 ....... D.S. 13-28 ...... 6-3-84 D.S. 13-28~'- 6-3-84 D.S. 13-28~- 7-8-84 D.S. 13-33./ 6-22-84 D.S. 13-33'" 6-23-84 D.S. 14-3~ 6-30-84 D.S. 14-21' 7-7-84 D.S. 14-24'~ 3-25-84 D.S. 14-34-" 5-19-84 Diff Temp Temp Log Diff Temp CFS/Spinner Diff Temp CFS/Spinner CFS/Spinner Temp Survey Temp Log Diff Temp Spinner Log Diff Temp Caliper Log Caliper Log Spinner Log Run 1 5" Otis Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" GO Run 1 5" Camco ,Run 1 5" GO Run 1 5" Go Run 1 5" Camco Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 4 5" Camco Run 1 5" Camco D.S.~. 17-10j 6-17-84 Diff Temp . Run 1 5" Camco · se sign and return the attached copy as receipt of data. Kelly McFar land ATO-1429F DISTRIBUTION · Trans. #301 Chevron D&M Drilling Exp. Services Ext. Exploration Exxon Ge tty Marathon Mob i 1 Alaska Oil & ~.~ Mobil E & P G~s C0r~s. Commission A~chora~e Phillips Prudhoe Bay Well Files R&D Carolyn Smith Sohio State of Alaska ARCO Alaska, Inc. post Office Anchorage .... 99510 Telephone 907 277 5637 June 20, 1983 Reference: Arco Pressure Data D.S. 3-11 "- 5-18-83 D.S. 7-9 ~ 4-3-83 / 4-3-83 D.S. 13-1 f D-'S. 13 -5 / 5-29-83 5-29-83 D.S. 15-4 J 4-8-83 ~ 4-8-83 D.S. 16-10/ 5-18-83 · D.S. 16-11 / 5-18-83 D.S. 16-14j 5-18-83 Static Survey Pressure Build-u~ Pressure Build-up Survey Report Static Survey Static Survey Pressure Build-up Pressure Build-up Survey Report Static Survey Static Survey Static Survey GO Camco Camco Camco Camco Camco Camco GO se sign and return the attached copy as receipt of 'data. Kelly McFarland ATO-1429D Trans. # 367 NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON DISTRIBUTION .OB L GETTY STATE DALLAS CAROLINE SMITH Post Olfice Box 560 Anchorage.~ '~ka 99510 Telephone [. 277 5637 December 16, 1982 RE' ARCO Pressure Surveys D.S. 3-8 11-20-82 D.S. 3-13 12-3-82 D.S. 3-15 11-21-82 D.S. 6-4 12-2-82 D.S. 6-11 11-11-82 D.S. 6-12 11-11-82 D~S. 11-6 11-7-82 D.S. 11-7 11-7-82 D.S. 13-1 10-22-82 D.S. 13-3 10-23-82 D.S. 13-5 10-29/31-82 D.So 13-22 11-22-82 D..So 13-23A 10-12-82 D.S.. 13-24 11-19-82 Static Survey Pressure Bui ld-up Static Survey Pressure Build-up Static Survey Static Survey Static Survey Static Survey Static Survey Static Survey Pressure Bui ld-up Static Survey Static Survey Static Survey Camco Gearhart Camco Otis Camco Dresser Camco Camco Camco CamcO Camco Camco Camco Camco D.S. 17-5: 11 - 18-82 Stat i c Survey Camco '.'17-6 11-18-82 Static Survey ~ Camco Please sign and return the attached copy as receipt of data.' Becky 'Benedi ct AFA- 403 Trans. #662 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON ARCO Alaska. Inc. is a Subsidiary of AtlanticRichfieldComD~nv EXXON MOB I L GETTY D&M STATE OF ALASKA DALLAS ¥.". ,,,' Anchor~D~ Post Office Box 360 AnchorageF .... ~ska 99510 Telephone% 277 5637 October 15, 1982 Reference: ~ARCO Case Hole Finals D.S. 6-21/ 9-9-82 CCL/Pe=forating Record D.S. 6-21/~ 9-12-82 CBL/VD D.S. 6-21/ 9-9-82 CBL/VD Run 1 SCH Run 1 SCH Run 1 SCH D.S.. 13-1~/ 6-20-82 Differential Temp. Survey 'D.S. 12-2 /6-21-82 Differential Temp. Survey D.S. 4-14~/ 10-7-82 Spinner Survey Run 1,2,&3 CAMCO Run 1,2,&3 CAMCO Run 1 OTIS D.S. 13-17~9-26-82 Spinner Survey Run 1 D.S. 3-6~/ 9-13-82 Engineered Production Log Run 1 /~ease sign and return the attached copy as receipt of data. Becky Benedict AFA - 403 · -. OTIS SCH Trans. 9550 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY~.~ GEOLOGY STATE OF ALASKA DALLAS ARCO Alaska, Inc. Post Office Bo/,,X~360 Anchorage, AI~ ~ 99510 Telephone.-90~_, 7 5637 August 5, 1982 Reference: Arco Cased Hole Finals D.S. 13-30 D.S. 18-2 D~S. 16-12 D.S. 14-14 6-19-82 7-20-82 7-17-82 7-9-82 7-12-82 CNL Run 3 5" ACBL/VDL/GR Run 1 5" ACBL/VDL/GR Run 1 5" Diff Temp Log Run 1 2" Collar & Perf Log Run 1 5" Please sign and return the attached copy as receipt of data. Kelly McFarland Trans. ~' 347 -.. DISTRIBUTION NORTH GEOLOGY R&D DRILLING PEILLIPS;~ MARATHON CHEVRON ARCO Alaska, Inc. is a subsidiary of AtlanticRlchfleidCompany EXXON MOBIL. GETTY' GEOLOG"f STATE OF ALASKA RECEIVED AUG - 5 1982 .Alaska Oil & Gas Cons, Commission ^nchorag~ ARCO Alaska, ]nc./~ Post Office ~ .~60 Anchorage, Alaska 99510 Telephone 907 277 5637 July 19, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.13-1 6/20/82 Diff Temp Survey Run 1 5" D.So12-2 6/21/82 Diff Temp Survey Run 1 5" Please sign and return the a_ttached copy as receipt of data. ,Mary F. Kellis North Engineering Transmittal # 280 DI'STRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M CHEVRON J U L 2 8 i982 Alaska 0il & Gas Cons, Commission Anchorage ARCO Alaska "~-:. ;s ,2 s'J~..,f::,~r¥ of A~'~2n~lcRichfieidCompany Post Office Box,'~60 Anchorage. ~¢''r~ 99510 Telephone 907 ,../7 5637 July 1, 1982 Reference: ARCO MAGNETIC TAPES & LISTS D.S.13-22/ 6/7/82 D. ~3,,t~,~/ 6 / 19 / 82 D.S. 13-26' 6/9/82 D. S.5-4 ~// 5/22/82 D.S.2-15~' 5/21/82 D. S.2-1P~,/' 5/20/82 D.S.2-24/~ 6/13/82 D.S.2-1A~/ 5/10/82 D. S. 13-24'"' 5/27/82 D.S.14-17~ 5/13/82 D S 13-22--_ 6/15/82 D S 13-26~ 6/16/82 Tape # 65174 Tape # 65233 Tape # 65176 Tape # ECC 1314 Tape # ECC 1315 Tape # ECC 1310 Tape # ECC 1343 Tape # ECC 1303 Tape # ECC 1321 Tape # ECC 1299 Tape # ECC 1349 Tape # ECC 1348 ~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 250 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY .~:S~T~0~::~:%E/i.s~~ _ )i/;._ "' ..~- ,,~),. ARCO Alaska, Inc ..... Post Office ~' 360 Anchorage. x~.,~ska~ 99510 Telephone S07 277 5637 April 15, 1982 ReferenCe: ARCO PRESSURE DATA D.S.4-11 3/27/82 D.S.4-14 3/28/82 D.S.14-3 3/14/82 D.S.9-6 3/5/82 D.S.12-3 3/5/82 3/13/82 Pressure Survey Pressure Survey II II II II II II II II. ase sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 102 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA ARCO Ala$~,,~. :mc. is a s.~l:;s,'J~;~ry o! AttantlcR,chf~e!,=Co,'npany ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnie C. Smith Commissioner March 3, 1982 Russ A. Douglass Petroleum Engineer Pressure Bui 1 ~d_-u~ on February 25, 1982 I traveled to Deadhorse in order to observe a pressure build-up (pbu) test on ARCO DS 13-1. After arriving at Prudhoe Bay I contacted John Groth, ARCO Engineer, and was picked up by Winston Toliver. Winston is in charge of the data collection (pressure, rate etc. ) aspect of the pbu. Winston drove me to the ARCO base camp where I met and talked with John Groth briefly. Winston and I then proceeded to the DS 13-1 location where I met Wes Wilder. Wes is the ARCO hand responsible for the mechanical aspect of the pbu. The three of us discussed the pbu test procedure and I received a copy of their standard procedure. The first step is to monitor the well to be tested for a minimum of 48 hours prior to testing. This consists of not changing the choke setting on the flow line and checking the pressure of the flowline regularly in order to establish that the well is flowing at a stabilized rate. If the well exhibits stability during this period it is then turned into the test separator approximately six hours before testing. DS 13-1 had been monitored for the past two days and was turned into the test separator between 1 and 2 p.m. on February 25, 1982. I was on location by 9:30 p.m. February 25, 1982. At that time the wireline crew (GO) was rigging down the lubricator to repair the pack-off which had failed to test prior to my arrival on the location. The pack-off was repaired and the lubricator again rigged up and tested. This time the test was good and they started in the hole at about 11:30 p.m. The first gradient stop is made at 100' MD. The tool is left at the first stop for 30 minutes to allow the tool to warm up to well temperature and allow the readings to be checked. Remaining gradient stops are made with a 15 minute duration. The subsurface safety valve remains in place during the pbu test. Normally the tool goes through the valve without any problem. Occasionally the well must be pinched back slightly to allow the tool to pass through the safety valve. When this happens, some extra time may be spent at the next gradient stop to allow the well to re-stabilize. The "Grove valve" is used to pinch back Lonnie C. smith the well on these occasions. This valve is located on the flowline some 40 or 50 feet downstream of the wellhead and upstream of the drill site manifold. When the tool is in position for the pbu test it is left in position and monitored for approximately three hours. Pressure and temperature data are taken at one minute intervals from the time it starts in the hole until five minutes prior to shat-in. At 'this time data collection occurs at 10 second intez*~als until one hour after..'shut-tn. Then one minute re, dings are taken until the pressure Change for 10 minutes is less '%.'han 0.5 psi, then the data interval is switched to 10 minutes. Of course these are guidelines which may be altered as well behavior so warrant s. After the buildup is complete a static gradient stop is made at 8800' SS and then at PBTD. Static gradient stops are made as the tool is brought out at the same points the flowing gradients were made. The well is then returned to normal service. The test on DS 13-1 was not completed. The tool would not pass through the FBR assembly located at 8987' MD. Wes informed me this was more than likely due to scale buildup on the PBR. The scale would have to be cleaned out using a slick line unit then the pbu test restarted from the beginning. The following are data col leered during the portion of the test I observed. ft ft psi 'F 100 26 703.92 162.5 2074 2000 95 7.33 175.5 4120 4000 1274.04 189.5 62.83 6000 1639.73 20 3.4 8'510 8000 2 053.6 3 212 Testing was completed about 2~00 a.m. February 26, 1982. i returne~ to the PCI camp about 2~30 a.m. and crashed. Before leaving I requested from John Groth a copy of the rate record for a well that was on test at that time (DS 1-4). He informed me this would be sent as soon as it was available. RAD/glh ARCO Cil and Gasj~' 'npany North Alaska' strict Post Office Box 360 ~Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer May 27, 1981 Reference: ARCO PRESSURE DATA /x/D. s. 13-1 4-10/11-81 Pressure Survey Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal f/303~ DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG, MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS 'SOHIO MARATHON CHEVRON RECEIVED JUN - 1 198] Alaska Oil & Gas Corls. Comn'lis~mo~. Anchorage ARCO Oil and Gas Company is a Division of AtlanticRichlieldCompany · . , · Februa~ 11, 1980 Reference: Enclosed. are Pressure Surveys for the following ARCO wells:  8/3-.5/79 Camco · 8/1-2/79 Camco D.S. 13-~2 10/27/79 Otis D.S. 13-3 8/22-23/79 Camco D.S. 13-4 11/3-4/79 Dresser Atlas ~~ease sign and return the attached copy as receipt of data. ! co,~ , -[~ COM~ RES ENG" J~ 2 EN~ [ 3 ENG I- ! 4 ENG ' L &~ 1GEOL I STAt TE~-- ~'STAT T EC -- ! ~ONFER: ~ILF: K. J. Sahlstrom North Engineering TRKNSMt TTAL # 084 No~th Geology ,k zl lin2. Ceol%y State oF Alaska Mobil C;etty Phi 1 i Soi~io Post O[iice Anchor:~ ,,Alaska 935'10 Tel::pl,:'~ S97 277 $637 October 16, 1979 Reference' Enclosed are CaSed Hole Logs for the following ARCO wells' D,S. 1-4 4/23/79 Spinner Flo~,~eter S" D.S. 1-12 7/11/78 Continuous Flmv S~ D.$. 3-6 5/21/79 Fluid Density 5" D..S. 5-I0 6/8/79 Spinner 5" D.S ~ ~ 8/26/79 Spectralog 5"  4/25/79 Collar 5" Casing · , - . $/21/79 - Fluid Density 5" D,S. 13-4 4/27/79 Cmnpensated Neutron 5" D.S,_ 14-7 5/4/79 Casing Collar 5" ~~Please sign and return the attached copy as receipt of data, K. J. SM~lstrm~ North 'Engineering T_--K~N~IITTAI, # 413 .~,'. Geology , .... ~. - , uk:~ t,]~(.)n ', O, r,. State o[ Alaska Phil] tt)~; D & H Chevron ..... ~,,', 'Box3BO TcIop?;on~ 0::7 2775G37 Au~,~st 30, 1979 Reference' Enclosed are Cased H01e Logs for ARCO wells' D.S. 1-6 D.S. 2-7 D,S. 1-9 D -0 8 D.S. 14-4 8 D.S. 5'-16 6 D.S.. 7-2 6 ~.~13 7 Please sigm and data. 7-9-79 Spinner 5-20-79 Spinner 6 - 3 - 79 Spinner 6-17-79 Spinner - 5 - 79 Spinner - 2- 79 Spinner - 1 - 79 Sp inner -16-79 Spinner Flo~cmeter' -28-79 Spinner Flowmeter - 7- 79 Co~lDensated Neutron GR return the attad~ed copy a's receip-c of Very truly yours, K. J. Sah.lstrom North Engineering TP~f4SMITFAL !~ 302 DISTRIB~T['ION North Geology Exxon Drilling Mobil Eng. Manager Getty R & 1) Sohio Ceo logy Ha'r att ~on State of Alaska Phillips I) & M Chevroa ARCO Oil and Gas Company Alaska Re ~ Post Of~icc, _,ox 360 Anchorage, A;aska g9510 Telephone 907 277 5637 August 23, 1979 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 995~ Subject' DS 1-13 rmit DS 1-18~.Permit No DS 4-15'~Permit No DS 7-7 fPermit No DS 7-84iPermit No. DS 7-9 ~Permi t No. · NO. ~-DS 13-3~ermit No. DS 14.4UPermit No. DS 14-5qPermit No. 77- 59 78-29 78-37 78-16 7 8- 7 6 78- 77 78-60 78-62 78-53 78_64,-~ Dear Sir' Enclosed please find a Completion Report reporting production information for the above-mentioned wells. Very truly yours, P. A. VanDusen District Drilling Engineer PAV'cs Attachments ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany Form 1~--7 SUBMIT IN STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE DUPL~'* ,'E* (See other In- structions on reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: OIL [~ GAS r-'l Other WELL r.~_l WELLL_I DRY L_I b. TYPE OF COMPLETION: NEW ~ WORK~ DEEP-J-'-J PLUG l-'-I DIFF. J-'-J WELL IAI OVER I I EN I I BACKI I RESER.I I Other 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4. LOCATION OF WELL (Rel:)ort location clearly and in accordance with any State requirements)* At surface 2290'N & 56'W of SE cr Sec 14, T10N, R14E, UM At top prod. interval reported below 1316'S & 1783'W of NE cr Sec 14, T10N, R14E, UM At total depth 1097'S & 1890'W of NE cr Sec 14, T10N, R14E, UM 13. DATE SPUDDED J14. DATE T.D. REACHED 11/24/78 , 5. APl NUMERICAL CODE 50-029-20323 LEASE DESIGNATION AND SERIAL NO. ADL 28315 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 13-1 ':I0~,FIELaANDP~OL, O~V~I~0~ATvruanoe ~a Prudhoe Oi~ Pool. 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 14, T10N, R14E, UM 12. PERMIT NO. J15. DATE COMP, SUSP, OR ABAND. !16. ELEVATIONS (DF, RKB, RT, GR, ETC)* 12/2/78(perf'd 5/9/79)1 74' RKB 78-60 J17. ELEV. CASINGHEAD 11/8/78 18. TOTAL DEPTH, MD&TVD 119. PLUG BACK MD&TVDI20. IF MULTIPLECOMPL., ~ DEPTH 10,055'MD 9511'TVDI9985'MD 9444'TVD I HOWMANY* Single 22. PRODUCING INTERVAL(S), OF THIS COMPLETION -TOP, BOTTOM, NAME (MD & TVD)* Top Sadlerochit 9322'MD 8819'TVD Base Sadlerochit 9916'MD 9378'TVD 21. ROTARY TOOLS All INTERVALS DRILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURVEY MADE 24. TYPE ELECTRIC AND OTHER LOGS RUN ~L//DIL/SP, BHCS, FDC/CNL/CAL/GR, GR/CNL/CCL 25. CASING RE'CORD (Report all strings set In well) 94# Welded J H-40 J 129' 24" 1167sx Arcticset II cmL 13-3/8" 72# Butt I N-80 I 2738' 17-1/2"16800sx Arcticset II cmt 9-5/8"J47# Butt iN-80& J 10,033' 1.?-l/4"Jl?Bn~× £1aqq G cml ~. Is°o-gsl i ' I -- LINER RECORD J27. .TUBING RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SCREEN (MD) J SIZE DEPTH SET (MD) J 5-1/2" 9126' 2'8. PERFORATIONS OPEN TO PRODUCTION (interval, size and number) 29. AMOUNT PULLED PACKER SET (MD) 8998' ACID, SHOT, FRACTURE, CEMENT ~UC~EZ.E,, ETC~ 9491-9529' 9435- 9475' 9397-9413' w/4 shots per ft. DEPTH INTERVAL (MD) N/A PRO"DUCTION IAMOUNT AND K~ND.OF MATERIAL USED ~ ;:S>i ';: JPRODUCTION METHOD (Flowing. gas lift. pumping--size and type of pump) F10wing OI L-BB L. GAS-MCF. J 13871 J TESTED JCHOKE SIZE J PROD'N FOR 5~20/79 '6 J 44 TESTPER,OD; FLOW TUBING CASING PRESSURE CALCULATED OIL--BBL. J 24'HOUR RATE1 PRESS. 927 ~ 55484 31. DISPOSITION OF GAS (s01d, used fo~' fuel, vented, etc.) Reinjected 32. LIST OF ATTACHMENTS GAS-MCF. 32196 I WE ~L~¥A~US ~¢rodu:,ng or j shut-,n) Producing WATER--BBL. JGAS--OIL RATIO 8049 J 301 J 580 JOIL GRAVITY-APl (CORR.) WATER--BB L. J1204 JTEST WITNESSED BY SIGNED Z~'~_ _ _ TITLE District Drilling Engineer *(See instructions and Spaces for Additional Data on Reverse Side) DATE 8/23/79 INSTRUCTIONS General' This form is designed for submitting a complete, and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which' elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 ahd 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME I~IE~S~ DEPTH TRUE VERT. DEPT ,. None Top Sadlerochit 9322' 8819' Base Sadlerochit 9916' 9378' !. , ... 361 CORE D'~'TA', ATTACH BRIEF DESCRIPTIONS OF 'LITHOI~oGY,'P'oROsITY, FRACTURES, APPARENT DIllS' AND DETECTED SHOWS OF OIL, GAS OR WATER. '-. .... ,, None , Post 0 Box 380 o~ :\la~ka ~gJ~O T-~ i~one g0f 277 5537 July 16, 1979 Reference' ~closed are the follm¢ingARCO magnetic tapes' #54301 .~./12/10/78 #s4zs~ w / ~/z3/78 # s4 z~o ~"/i~/14/78 ~54Z57 ~/ 11/Zl/78 ~s4~ ~ ~o/~/78 D, S .' .. 7 - 7 OH th.m 1 ~, .... '.D.S.,..:.l.,3-1 '~ Run 1 D.S. 4-5 D.S..14-3 Run 2 Very truly yours, · R. A. Bellinger North Engineering TRANSMITTAL # 225 North Geology Drilling Eng. Manager Geology State of Alaska DISTIll BIg'ION ILxxon Mob i. 1 Getty Sohio Marat]~on Phi ]. Chevron Jtme 21, 1979 Reference.· -Enclosed are pressure buildups for the following wells' o . / D.$. ~3-6 5/22-23/79 Dresser i 4-12 5/31-6/1/79 Dresser D.S _ D.S 4-25/5-6/79 Dresser D.S. #13-2 5-21-79 Dresser. D.S. #13-3 5-20-79 Static Dresser · D.S. #9-1 5-13-79 Go Wireline D.S. #9-15 5-16-79 Go Wireline D.S. #7-7 5-27-79 Static Dresser D.S. #14-5 5-31-79 Static Dresser D.S. #7-10 5-26-79 Static Dresser D.S. ,~14-4 5-2·8-79 Static Dresser D.S. #7-6 5-24-79 Static Dresser D.S. #7-8 5-23-79 Static Dresser iD S #6~ 4./29-5/1-79Static Dresser #4 3 4-24-79 Go Wireline Please sign and return the attached copy as receipt of data. Very tI~ly yours, R. A, ttmnlin North Operations Engineering Transmittal #190 D 1 S']'RI }~U'I' i ON North Geology Dr:i ]. ]. ing l';ltg. Nanager R & l) Goo ]ogy State o:[ Alaska Mob:ii Gott>, Sob io ~Iara tho:~ Pl~i ].lips Chevron ARCO Oil and Ga(' Alaska Reglo, Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May ll, 1979 Mr. Hoyle H. Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 12 S GEOL STAT TEC STAT TEC CONFER: FILF: Subject: DS 13-1, Permit No. 78-60 Dear Sir' Enclosed please find a Completion Report along with the Perforating History for the above-mentioned wel 1. Very truly yours, P. A. VanDusen District Drilling Engineer PAV'cs Attachments ARCO Oil and Gas Company is a Division of AtlanticRichfieldCompany STATE OF ALASKA (See other in- Sl rLictions reverse side OIL AND GAS CONSERVATION COMMITTEE i i i WElt. cOMPlETION OR RECOIvIP/ETION REPORT AND LOG* II "'i,. YYPE OF WE,.'~: o,,, [] ~.s [--1 Fq WELL WELL DRY Other b. TYPE OF COMPLETION: NEw[X] V.'ORK [~I DEEP-F--] PLUG[---] DIFF.["--[ 1%' ELL OV ER E N BACK nESvg. Other 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRI~-S8 OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 LOCATION OF WELL (Report location clearly and in accordance with any Etate requirements)* At surface 2290'N & 56'W of SE cr Sec 14, TI0N, R14E, UM At top prod. interval reported below 1316'S & 1783'W of NE cr Sec 14, TI0N, R14E, UM At total depth 1097'S & 1890'W of NE cc Sec 14, T10N, R14E, UM ~3' D*: S~UDD~ J~'~' DA~ T'D: ~*C~ J~'' D*= c°~ sUsP °~ A~'11/8/78 11/24/78: 12/2/78 J Jla' ~VA~OSS (nF, ~KS, 74'RKB 18. T~AL D~H, ~ & TVD ~9. PLUG, ~CK MD & ~. ~ ~LT~LE CO~L., 21. 10,055'MD ..... 9511'TVD {9985'MD 9444'TVD { ~ow~.Sin~le ~o~,~oo~All ~. PRODUCING IN~VAL(S), OF ~S COM~TIO~, BOSOM, N~E (~ AND Top 5adlerocbit 9322'~5 8819'TVD ~ase Sad]erochit 9916'~5 9378'TVD AP1 ~CAL CODE 50-029-20323 6. LEASE DESIGNATION A.ND SERIAL NO. ADL 2831 5 IF INDIA_N, ALLO~ OR TRIBE 8. UNIT,FA_HAl OR LE~SE NAME Prudhoe Bay Unit 9. WELL NO. DS 13-I Sec 14, T10N, R14E, UM I2. P]~'VIIT NO. " 78-60 ! RT, GR, ~PC)* !17. ELEV. CASINGHEAD INTERVALS DRILLED BY " '1 CABLE TOOLS 23. WAS DIRECTIONAL ) SURVEY MADE Yes i 24. TYPE ELECTRIC AND OTHER. LOGS RUN DIL/SP, BHCS, FDC/CNL/CAL/GR, GR/CNL/CCL CASING RIgCORD (Report ;11 strings set in weld , CASiNG SIZE ] WEIGHT, LB/PT', { 'GP,~I/I .1 DEPTH SEI ' HoLE SIZE [ C.E~IILNTING RECOi~D I A~WIOUNT PULLED ' 20" [ 94# Welded[ H-40 { 12§"" ' 167sx Arcticset II cmt 13-3/8" [ 72# Butt '~ N-80! 2738" 17-1/2"] 6800sx Arcticset II cmt 9-5/.8" [ J 47# But't '/N-80&.J 10,03]3' 12-1./4",,JI ~250sx Class G cmt ,I ~, LIN~ ~o~ .... J -' Ii , .. , , ., , ": .,'.' ..~,., ,, .,~P~ (iVID)5-1/2" ' 8998' ~ - 28. PERFORATIONS OP~N TO PRODUCTIOlq' (Interval, size and number)' ').9. ACID, Si'rOT, F~AUTUI::L1E, CE, NIE:NT SQLTE~Z~,, C. 9491-9529' ~ : DMZ-{ iz,~v~ (m)) ,J A~og,~'r ~ ~;~. o~ ~.~ US~ 1 9397-94]3' w/4 shots per ft t,,'~'~'":-," PKODU~ON DATE F~R.ST P~ODUC~ON [ ~ODUCTION MEIIfO,D (Flowhlg, gaa ii/i, pump~g~size and type of pump) Not. available at thi[s time 'v,T~ or [Ho~s TES~ ]atOXE SiZE JPROD'N FO~ OI~BEL. GA~CF. FLOW, ~BIHG ' ]CAS~G P~SU~ [CAL~~ O~BBL. GA~, ~SS. . l ' -- J24-HOUR RA~ . ~ .[ 32. LIST O1~" ATTACHMENTS JWE LL STATUS (Producing or shut-in)I WA~I~R---BBL. J GAS-OIL RATIO i WA~BE. J OIL GRAVITY-~I (CO~.) 1 J TEST WITSESS~D BY Perforatinq Hi story 33. I hereby certify tliat the for. eg~ing and attached information is complete and correct as determined from alUavailable records sm~ ..... ~-. ?~L~, District Drilling Engineer ~,~ 5/11/79 __ m i i i m i "'*(See Instructions and Spaces for Additional Data on Reverse Side) General: This form is designed for submitting a complete and correct well completion ref_',ort end log on all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for deplh measure- merits given in ¢lher spaces on this form and in any attach;~.'~er'~ts Items 20, ancl 22:: If this well is completed for separate, production from more than one interval zone (mulliple completion), so state in item 20, and in item '22 show the p~cJuci~.rj interval, or intervals, top(s), bottom(s) ~nd name (s) (if any) for only the interv~l reported in item 30. Submit ~ separate report (page) on'this for.m, adequately identified, for e~ch ~ddition¢~l interval to be seperately produced, show- ing the ackiitional data pertinent to such inter¥~l. It, em:26: "S~Cks Cer0~ent": Attached supplemental records for this well shoul:..I show the details of ~ny mul- tiple stage cementing and the location of the cementing .tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 ~nd 22 above). WAT~J,I~ AND MUD None , ,, ~,~^s r~,~ ~t,~ v~,...;d~, ....... Top Sadlerochit 9,322' 8,819' ' Sase Sadleroch~ . 9,916' 9,378' .I _ ~'~,' · . ...- > . .~. ~ . ..: ~ .. · .... . ; . . , ..... , .... . L , ~ ~ ~ ~1~ ~ ~ ~ ~ ~ ~M. - ~ ~ n. ~, .. ~ .... ~ .l~ .... ~ ? ... ,~ ~ :'--. .-. . . None Norlh Alaska District Post Office~ '330 Anchorage, Amska 99510 Telephone 907 277 5837 ~mrch 15, 1979 Reference: Enclosed are the following open'hole logs: DS 7-8 CNL/FDC 1/1/79. DS 7-8 DIL 1/1/79 DS 7-.8' FDC 1/1/79 DS 7-8 ~S 1/1/79 DS 7-8 BHCS 1/1/79 DS 7-8 DiL 1/1/79 11 2" 5II 51I DS 7-7 FDC 12/10/78 DS 7-7 BHCS 12/10/78 DS 7-7 CNL/FDC 12/10/78 DS 7-7 DIL 12/10/78 11 511 511 511 DS 14-.4 BttCS 1/03/79 DS.14-4 DIL 1/02/79 DS 14-4 BHCS 1/03/79 DS 14-4 DIL 1/0.2/79  CNL/FDC 11/23/78 FDC 11/23/78 DS 13-1 DIL 11/23/78 '21I 2II 511 5II 11 DS 13-1 , BHCS 11/23/78 5" Please 'sign and return the copy as receipt of data./ Sincerely, · V.G. Reimers North Engineering TRANSMITFAL #97 DISTRIBUTION North Geology Drilling Eng. Manager R&D Geology State o£ Alaska D&M Exxon Sohio Mobil Marathon Phillips Chevron Getty' March 29, 1979 cc:,v~,¢. 1.:'t £,~' ~. ,_: ir:NO P . ~ __ ~ 4 ":'-! ~'..-, ' ' C.:. i*'r'¢'! ,,. !'. ~,.",:. ' i "" ..... ,;, ¢,, ............ 1 i FI ,'._ F: ........... Reference' Enclosed are the following open hole logs' '//"DS 7-7 BHCS 2" 12/10/78 ~fTv~DS 7 7 D'iL 2" 12/10/78 o/14', t/D~S 14-2 DIL 2" p,~ /.;~S 14- 2 BHC$ 2"  DIL 2'" BHCS 2" .~.~ 13-2 Mud log 13- 2R Mud log 10/21/78 10/21/78 11/23/78 11/25/78 12/ 7/78 - 12/29/78 12/ 7/78 - 1/51/79 Please sign and return ~he Copy as receipt of data. Sincerely~ V.G. Reimers Nor th .Engineering TRANS?.'II~WAL fl137 DISTRIBUTION North Geology ])tilling Eng. Manager R& P Geology State of Alaska }[XXOI1 Mobil Getty Sohio Marathon Ph:ll ].'i. 1)s Chevron Post Offica Bo:< 330 Anchorage, ~ a 99510 Telephone 9~,..,..I7 5S37 ~larch 15, 1979 Reference' Enclosed are the following open hole logs' -.. DS 7-8 CNL/FDC 1/1/79. DS 7-8 DIL 1/1/79 DS 7-8' FDC 1/1/79 DS 7-8 BHCS 1/1/79 DS7-8 B}~S 1/1/79 DS 7-8 DI'L 1/1/79 2" S" 5!! 2" 5'' DS 7-7 FDC 12/10/78 DS 7-7 BttCS 12/10/78 DS 7-7 CNL/FDC 12/10/78 DS 7-7 DIL 12/10/78 5~' DS 14-4 BttCS 1/05/ DS 14-4 DIL 1/02/ DS 14- 4 BHCS 1/03/ DS 14-4 DIL 1/02/ ~ CNL/FDC 11/23/ DS 13-1 FDC 11/23/ DS 13-1 DIL 11/23/ DS 13-1 BHCS 11/23/ Please 'sign and return the copy as rece Sincerel?, V.G. Reimers North Engineering TRANSMITTAL # 97 DISTRIBUTION 79 '2" 79 2" 79 5" 79 £" 78 5" 78 5" 78 ' 5" 78 5" ipt of data.5/ North Geology Drilling · Eng. Manager Geology State oEAlaska ~x×on Sohio ~bbil ~.Iarath.on Phillips O~evron Getty North Alaska District Post Office ~" qS0 Anchorage, ,~ ..La 99510 Telephone 907 277 5-337 March 15, 1979 Reference: · -, Enclosed are the following cased hole logs' ' DS 17,~1~ ~ TDT 11/18/78  CBL 11/27/78 CNL 12/ 2/78 DS 7-7v CNL 12/17/78 NGI #2¢ EPL 12/ 8/78 Please sign and return the copy as receipt of Sincerely, V.G. Reimers North Engineering TRANSMITTAL #1 O0 DISTRIBUTION North Geology Drilling Eng. Manager R& 1) Geology . '-State-;,of Alaska" ~ "D&M" ][xxoz~ Sohio Mobil ' ' Marad~on Phillips Chevron Getty March 6, 1979 Prudhoe .Bay Unit DS 13-4 Atlantic Ricfield Company Permit 78-63 Mr. P. A. VanDusen District Drilling Engineer Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 Dear Sir: We had originally requested core chips from wel~ on the DS 13 pad. However since you did not well we are requesting core chips from your DS 13-4 well. It is our understanding that you are submitting a mud log for well DS 13-2, therefore we are waiving this requirement for your DS 13-4 well. Yours truly, Hoyle ~. Hamilton Chairman A~,~nlicEich ii2k. l Cometary North American Pcoducing 9ivi:~ion North 'Alaska ,F',,~ trict Post Oifice(~ J60 Anchorage, Alaska 99510 Telephone 907 277' 5637 February 20, 1979 Reference: Enclosed are the following MAGNETIC TAPES:  i2/2/78 #S4607 ~t 1/1/79 #54576 Gt NGI #12 12/20/78 #54571 OH DS 14-4 1/2/79 #54575 OH . ease sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSbIITTAL # 78 DISTRIBUTION North Geology Drilling Eng. Manager R&D Geology State of Alaska D&M Exxon Sohio Mobil Marathon Phillips Chevron Getty Horlh A!ask" qislrict Post O[lice ~l~ ?.,S0 Anchorage, l,q ~'ka 9-3510 Telophone 907 277 5S37 February 2, 1979 Reference: Enclosed are the following Directional Surveys' DS 7-8 DS 14-4 Gyroscopic Survey Gyroscopic Survey Gyroscopic Survey Please sign and return the copy as receipt of Sincerely, 1/26/79 1/2.6/79 1/19/79 da ta. ~'"~ V.G. Reimers North Engineering Transmittal #058 DISTRIBUTION North Geology. Drilling Eng. Manager : R&D Geology State.of Alaska. D & M Exxon ~Sohio Mobil Marathon Phillips Chevron Getty Atlantic~ichfieldCompany North Amebean Producing Division North Alasl~ ,istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 % january 31, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 13-1, Permit No. 78-60 fILE: Dear Sir' Enclosed please find a Completion Report along with the Drilling History and Magnetic Multishot Survey for the above-mentioned wel 1. Very truly yours, P. A. VanDusen District Drilling Engineer PAV'cs Attachments ~ SUBMIT IN D, 2TE* STATE OF ALASKA ,'See other ln- S~ ructiorls O11 OIL AND GAS CONSERVATION COMMITTEE re,'e,'se s~de~ nl i i WELl cOMpLETION OR RECOMPI_ETION REPORI AND LOG* F-. . la. TYPE OF WELL: OIL,,.ELL ~] GASWELL ~--] DR~ Other b. TYPE OF COMPLETION: WELL OVER EN BACK nESVR. Other 2. NAME OF OPERATOR At] antic Richfield Company ...... . 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 LOC~TX0S Or W£LL (Rel~ort location c~early and in accordance with any State requirements)* At surface 2290'N i 56'W of SE CT. Sec. 14, T1ON, RI4E, UM At top prod. interval reported below 1316'S & 1783'W of NE cr. Sec. 14, TION, RI4E, UM At total depth 1097'S & 1890'W of NE cr. Sec. 14, TION, RI4E, UM 5. ,~>I NLr~CAL CODE 50-029-20323 '6. I~E DESIGNATION A-ND SERIAL NO. ADL 2831 5 ~. I~4 IN-I)IA_N', AJ~TTEE OR TRIBE NAM~ 8. UNIT,FA.RM OR ~SE NAME Prudhoe Bay Unit 9. WI~T,L NO. DS 13-1 I0. FLE&,D AZ/D POOL, OR WII-,DCAT Prudhoe Bay Field - OBJECTIVE) Sec. 14, T1ON, R14E, UM 12. PERMIT NO. 78-60 13. D~TJg SPUDDEZ)' 11/8/78 18. TOTAL DEPTH, MD & TVD[9. PLUG, B~CK MD & TVDp. IF iV~JLT~PLE COM~L., [ 2L' ]0,:055'MD' 9511'TVD[ 9985'MD, 9444'TVD/ aow~=,Sin~le I ~o,~}o~ ~. PRODUCING IN~VAL(S), OF ~is COM~TIO~--~, BOSOM, N~E (~ AND ~)* Top Sad]eroch~t'~9322'MD, 8819'TVD Base Sad]erochit:9916'MD, 9378'1VD 24. T~E E~CTRIC AND OTH~ LOGS RUN [ ELJgVATIO]gS?4~t~I:F~ RKB, RT, GR, ~lq2)*I17. F_J_~W. CASINGHEAD 14. D.~TE T.D. RF.~CKED 15, DATE CO.1VLP SUSP O~ ABAN-D. [ 11/24/78 12/2/78' INTERVALS DRILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURVEY MADE Yes DIL/SP, BHCS, FDC./CNL_/CAL/,GR, GR/CNL/CCL CASING RECORD (RePOrt all strings set in well) C~SIAIG SIZE 20" 1 3-3/8" 9-5/8" 72# Butt..` [ N-80 [ 2738' 17-1/2"[6800sx Arcticset II cmt 47# Butt IN-80& i 10,033' 12-1/4" l1250sx Class G c,mi: , Is00- si l' ,,, 26. LINER I:UgC ORI) i 28. PERFORATIONS OPW-LN TO PRODI~FI~N~ ~Zfit~r~ ~e[,a~d number) ! A~MOLrNT PULLED I · N/A SCi~EEN (MD) SIZE DEPTIt SET (1VID? ~ PACt{ER SET (MD) DEk~TI{ INTERVAL (MD) AMOUNF /'~ND KIND OF M.a_T~R/AL USED ' N/A DATE FIRST Pi~ODUCTION [ PI~ODUCTION ME1HO.D (Flowh,.g, gas lift, pumpix~g--size and type of pump) N/A DATE OF T~ST, IHOLrRS TESTED ~[~OXE SiZE PROD'N FOR OI~BBL. GA~CF. ~OW, ~BING [CA~G P~S~ [CAL~~ OI~BBL. GA~I~. I WELL STATUS (Producing or sLut-in). i, 32. LIST Or ATtaCHMENTS Drilling History, Multishot Survey (No gyroscopic available at this time) 33. I hereby certify that the foregoing and attached information is complete and correct as determined from all'available records SIGNED ~Z~'~/~. ~/~ TITLE District Drilling Engineer DATE [ WA'I~ER--'BBI-,. ] GAS-OIL l~%TIO iWA~TEi~--BI~L. IOIL GRAVITS.r-A.PI (COlq~.) I TEST W~T~ESS~D R, mil I ! I I I I · *($,, Instructions and Spaces [or AdditiOnal Data on Reverse Side) 1-4-79 ..... General: This form is designed for submitting a complete and correct' well completion report and lag on all types of lanJs and leases in A'laska. item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- meats given in ether spaces on this form and in any attach:.nents. Items 20, and 22:: If this well is completed for separatc, prccJuction from more thnn one inlerval zone (multiple completion), so state ~n item 20, and in item 22 show the prcJuc~.0 interval, or ~ntervals, top(s), bottom(s) and name (s) (if any) for only the interv~Jt rel~orted in item 30 Suhr-nit n sep~r;~te report (page) on this form, adequately identific'd, for each additior~,~l ir~te~vnl t.o be separately produce:J, show- ing the acklitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form-for each inlerval to be separately produced. (See instruction for items 20 and 22 above). WAT~ AND MUD NAM~ I i iii ii . ... . ........ ... ....................... i . ,. , , , . . y. ~ ,,, ,, .; ~ ; ,, ~ , ,, , DS 13-1 Drilling Hi story API 50-029-20323, ADL 28315, Permit No. 78-60 Spud @ 1330 hrs 11/8/78. Drld 17-1/2" hole to 2924'. Ran 13-3/8" csg w/shoe @ 2738' Cmtd w/6800 sx Arcticset II w/0.6% D13R, 15.2 ppg slurry. Drld out & tstd ~orm to 12.5 ppg equiv. Drld 12-1/4" hole to 10,055'. Ran DIL/SP, BHCS, FDC/CNL/Cal/GR logs. Ran 9-5/8" csg w/shoe @ 10,033'. Cmtd w/1250 sx Class G cmt, 15.8 ppg slurry. Pumped 300 sx Arcticset I cmt thru lower FO. Ran CBL log. Did Arctic Pack. job thru upper FO. Displ mud w/wtr & wtr w/CaC12. Ran junk bskt. Ran 5-1/2" compl assy w/shear sub @ 9126', pkr @ 8998, Bal-O valve @ 2195'. Tstd control lines. Set pkr. Displ w/diesel. NU & tstd Xmas tree. Pulled dummy valve. Ran GR/CNL/CCL. RU for long term tbg tst. Released rig. @ 1800 hrs 12/2/78. DS 13-1 PERFORATING HISTORY API 50-029-20323, ADL 28315, Permit No. 4/25/79 Rigged up perforating equipment. Perforated intervals 9491-9529', 9435-9475' and 9397-9413' with 4 shots per foot. All perforated depths referenced to BHCS log dated 11/23/78. Ran 7 day pressure pulse test. Ran & tstd SSSV. Released well to Production Dept. 5/9/79. PRESSURE BUILD-UP SURVEY PROCEDURE 1. Produce well at a stable, rate for a minimum of 48 hours. me 7~ 2. Place well on test during the final 6 hours of flow. Be 4~ 5, Rig up to run Hewlett-Packard pressure bomb, maximum recording thermometer, and CCL. Before running in with wireline, insure that the fusible lock-out cap,is,~inst-alled hand tight on the SSV and that the low pilot is blocked out Initiate k~55 program. Run in making a 30 minute gradient stop at 100' MD. The remaining gradient stops should be 15 minutes. Gradient stops and buildup depth are listed on Data Sheet. ,. When going through the SSSV, use Grove valve to ,choke the well back, Do not allow choke setting to change. (Note: Lock out low pressure shutdown switch at the inlet gate valve when pinching back to go through SSSV.) Place the HP bomb at designated buildup depth. After flowing 3. hours at a stable rate, shut in the well at the GrOve valve for a 24 hour buildup. , Pressure Buildup ~ ~ . ..... HP Data Printout Interval Sta~bilization prior to shUt-in - 1 minute readings Five minutes before shut-in, switch to 10 second, readings 'One hour after shut-in, switch to 1 minute readings · . When pressure change for ten minutes'is less than 0.5 psi, switch to 10 minute readings After'completion of the 24 hour buildup,.check pressure at 880Q' SS, and check PBTD with Hi> tool. If necessary, flow well for 20-30 minutes at a low choke setting to ~ree wireline of hydrates. POH, making final gradient stop at 100' ~D for 20 minutes and rig down. Check to see that the .fusible cap is removed from the SSV and that all needle valves leading to SSV and sSSV are open. Return pilot to service. Notify flow station that testing is completed. Well: Su,'z.{ac¢ Loca.t, ion: Bottom Hole Loca,Cion: '~ Orlgi~a~ RKB: 74' Top of Sadl~ocl~: 9322' · · 2290'N & 56'W of SE cr Sec. 1097'S & 189~'~ of ~ cr Sec. RKB t~ OCT Ha~t~,q.: 25' COMPLETION: ID--10,055' MI) 20II x @ 129 FO@ 2347' w/300 sx. FO @.2470' w/167 sx. 13 3/8" @ 2738' w/6BOO sx. 9 5/8" x 5 1/2" Baker SAB Packer @ 899B' · Top of Sadlerochit--9322' 9397'- 9413' 9435'- 9475' -'.- 9491'- 9529' PBTD--9985' MD 9 5/8"'@ 10,033' w/1250 sx. Camco Bal-O Valve Landing Nipple M 2195' Baker "L" Sliding Sleeve M 8823' Baker "R" 5 1/2" Landing Mipple @ 89~8' BOT PBR Assembly @ 8987' Baker SAB Packer M 8q98' Baker "R" 6 1/2" Landing Nipple M 9065' Baker Shear Out Sub @ 9126' 5 1/2': tubing Perforations completed 4/25/79 P. O. Box 6207 Anchorage, Ak ~1. A. Fouch~ President 99502 .,-sun January, 29, 1979 Mr. Bob Hines Atlantic Richfield Ccmpany P. O. Box 360 Anchorage, AK 99510 Re: Our Surwel Gyroscopic Survey Job No. SU3-16344 D.S. 13; Well #1 Prudhoe Bay Field North Slope, Alagka Date of Survey: 1/19/79 Dear Mr. Hines: Please find enclosedthe "Original"of our SurwelGyroscopicMultishot Directional Survey on the above wei1. The original includes a horizontal and vertical proje~on along with the machine ~uted tabulation sheets, film andoriginal field data sheet. Thank you for giving us this opportunity to be of service. Yours very truly, SPERRY-SUN, INC. Survey Enginee~ I JS/kc Enclosures RECEIVED FEB- 9 SPERRY-SUN WELL Su-AVEYING COMPANY -PAGE 1 ....... .... "' "? CH'. ORA6 E.:~!:~i~'::A'E ~A' 4~i.i!-ii:::~::!;:- '. /'!:':'!..!:i :'" "~"::. :::'/- ~'~'": t.: " '' "".':~' ' _':. :~: A T L ANT ! C R .['C"~F I'EL~ ' C O~PAN~Y/:::'"' '.'.' .: r '.- ;:/ ~" ...:~:'.?'?"/;:""~'t":;'::.~' ";-:/ ?':~::./':~':?:':'.':"~;.~::"':':?;:.: '- ..... :: :~; '/ ' DAT'E:~:?OF-~'S'U~'E'Y "~A NUAE Y 20, ] 97~ DS-13-1 COMPUTATION DATE SURWEL GYROSCOPIC SURVEY ALASKA KELLY BUSHING ELEV. = 7~.00-FT. .E"ASURE~ V'['R'T~'CAL:"::''VE,RTzC;~L"'::::':]"'CC:'~'"~T]'O"':'"/U:Z-4?[CT:Z~' S~-V~-R:~T~;~';:-'.:R[cTA"'GU'~'C:A.R'''' CO0.DZ".'~T'ES' VER:TZCAC' DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/1 O0 NORTH/SOUTH EAST/WEST SECTION 100 2O0 .12 2.62' S 1.52 E -2.98 · OG 2.61 S 1.80 E -3.16 ,16 2.68 S 2. 05 E -3.,37 ?~/~?~!!:i'i!!~i!f~!?!i;?:??:.!i'~:::"~:':~::~i:.?f £::i?%)i:'::!.':::i:~:f:' :~:::.~:~ S':-': % ::.'?":"'. 17 21 22 .O_Q_ 1699.99 ]62~..,99 ~ 0 2,5, $ ,70. 0 ~ .~ ~t.2,,9.,S ..... 1. tO8 E , -3.96 o'o.~i' :!:;',i:?~?:.~i~ii~,~;i:~ :~ ~i~"~;!i~ ii:~;:~ ?!';:::.~!~ ~ ~i~?~:~!:i.:~!:~i~i~i~;~':~?::i:i:~?:;:iS :~:'~!~. ~i~i~'~ii~i~i~i.i. ~ :~:~.;:.~:--; z:O~:.~ ~.::~ ~:~'. O0 2099,98 2025,98 0 15 S 1~, 0 W .15 ~,9~ S ,2~ W -3,61 O0 21.g9,98 2~25,9R 6 15 S 9. 0 W .02 5.~7 S .~2 W 900 R99.99 82..5.99 O 10 S 82. 0 E 1000 999.99 925.9'9 0 10 N 78. 0 E ~ a ~::~ ~ e: 9"; ~.~ ::, ~.?:~i;~-~?~:~..~ ~.~ 1500 I~99.99 I~25.99 0 10 S 52. 0 W l~O0 1599,99 1525,99 0 300 300.00 226.00 0 10 S 17. mOO ~00.00 326.09 O 15 S 5. 500 500,00 q26tO0 , 0 10 S ~,0 E 0S-13-1 PRUDHOE BAY FIELD ALASKA DEPTH DEPTH COMPUTATION DATE SUR~EL GYROSCOPIC SURVEY UANUARY 25, 1979 ,JOB NUMP, ER SU5-1.(~5~+ ..... . ........................... KELLY BUSHING ELEV, =. 74_,.00 FT, VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEPTH DEG MIN DEGREES DEGtl O0 NORTH/SOUTH EAST/WEST SECTION 3~00 338 7.95 3313,~5 17 15 N Sq. 0 ,~5oo ~8:5.,+:: ~5,~o'~..~ ~7 2o N 5~. o 5600 3578.82 350~.82 17 ~5 N 55. 0 4000 395~,~6 3R85,~6 18 15 N 5~, 0 qlO0 q05~,57 3980,37 18 30 N 5~, 0 ~200 qlqg,18 ~075,1R 1R 35. N 5~, 0 .~ 5 oo .:.: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::: :...::?:?::..4.~.~:-.~ ~. ::........- q600 ~+527,50 ~q53,50 19 20 N 52, 0 W ,17 272,92 N 382,51 W ~55,78 ATO0 4621,76 ~547.76 19 40 N ~8, 0 W 1,38 29~,37 N q07.86 W A~O0 A715,78 ~6~1,78 20 10 N ~7, 0 W ,60 317,38 N q32,97 W 522,~9 5PO0 5089.79 5015.79 21 35 N ~5, 0 W .42 ~16.SS N 53~.50 U 663.66 5300 5182.65 510~,65 ~2, O ~ ~. 0 ~ ,56 q{2.81 ~ 560,52 ~ 700.69 5~00 5275,15 5201,15 22 ~O N ~q, 0 W .67 ~70,lq N 586,92 W -738,62 .............. , ~"6'b :::::::::::::::::::::::::::::::::::::::: ~':?:;:~08:?~?:~:B~.~:3:;~.0 ~:~::~::~~0:~:~: ~::'~:~: :::::::::::::::::::::::::::::::::::::::::::::::::: S::::::: .:.': 5800 5639,51 5565,51 25 20 N ~, 0 W ,54 5R9,80 N 700.42 W 903,52 5~00 5729,7~ 5655,7~ 25 ~5 N ~, 0 W .~2 620,81 N 730,37 .6000 5819,71 57q5,71 26 0 N ~, 0 W ,25 652,21 N 6 ~ oo .... ::::::.::::~: :::::::::::::::::::::::::::::::::::::::::::::::::::: ,:':79'i ;7~ :': U ::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::: W ,42 51,q6 N 7R,7! W 90,2~ W .08 68.93 N 102.76 W 119,1~ W .39 86,35 N 12-7,19 W lq8,25 W ,35 157,07 N 227,71 W 267,30 W ,25 175,60 N 255.22 W 297,95 W ,33 1 94.52 N 278 o 78 W 328,95 // ~'::: ',~i!?!' ::?: ::",::i:i: :~'::::~.::: S~':ERRY w:"S;U N :' !~!:!W!:.E:[::~'i:~:'i' :~U:[~ Vi::E:Y' I :N' G': :C.O' M:P' :::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::;: ATLANTIC flICHFi:E~D c'oHPAN':Y,": '.':' ':: ~" '~ "" :' .:: :':':::': '" .: .:: ~": DA:TE:::OF sURVEY JANUARY' PRUDHOE BAY FIELD AL ASKA MEASURED DEPTH COMPUTATION DATE SUR. WEL GYROSCOPIC SURVEY dANUARY 23~, 1979 dOB NUMBER SU3-ZG3Z+4 KELLY BUSHING ELEV. : 7q,OO FT. E.' ":- ": '.:'::" '!:'' ::::':;' 'ti4,:'-COURSE.... ;'": ::' ":::'"' ::::::;;: ::":;'"-'-:" '::' DO ,... ~. £. G'!-:':'G~:&': '":' +: ': r. ' :'";"'/' :" ":'::' "'<: '"'T O, T .AL;::; ': ' VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEPT ~t DEPTH DEG MIN DEGREES DEG/! O0 NORTH/SOUTH EAST/WEST SECTION ..... ~ ..... 6'500 ..... 62'67."2'.3''' 6J93'~3 ........ 27 .... 0'"~~7; 0 W .00 ' 81'3.~I N .... 91~.7'i~-'-~-'j-2-~-2~5i 6600 6556,27 6282.27 27 10 N ~5. 0 W .17 B~G.71 N 9q5.76 W 1258.00 6700 6~5~10 6371.10 27 30 N ~5. 0 ~ .33 880.29 N 977.07 W 7100 6799.]6 6725.16 27 50 N ~1, 0 W .~7 1.017.50 N 1102.fl0 W 1~89,86 7200 6~87,63 6~1~.63 27 ~5 N ~1. 0 W .08 ~052,69 N 113~.39 W 1536.~8 7300 6976.23 6902,23 27 30 N ~0. 0 W .53 1087.95 N 1163,50 W ~582.85  .:~ :.:.':;:::?::::~-::::'~:.~.:2--~..':... ::::,::' ~ 1,~:2':'~: :9 8'::'U.-':;-::;.~ .;;-....' 16-2.8,. 7 ~ ~ ~ :' :": :'z ~ ~'~;; ~.'::::~:::;;~.~:: :~:,:/~:i/:~ ;;:~?::;?::?:~:~:~ :::':'~:S ~":;::..::":-'.'~-::i:~':~-;:~; S:':':~:'.:.-:; :.".:': ~.. ~ ~';-~ ~".'."';-:.:. ::, ~ ~ ~ ' s o 77fl0 7~3.5~ 7259.5~ 2G 0 N ~9. 0 ~ .~ ~226.90 N 1277.5G ~ ~7~2.58 7900 751~05 7QQO. 05 25 0 N ~9. 0 ~ .50 ]29~.8] N ~3~.75 ~ ~8Q8.~5 .... :':....... ".'.;':,"~-"' ':' ' .:" :. :'".':-.~..~:.::.~2~::.~:~¢:~:4y;)~i.~:..~/.~<~.~:.::~..~...:?~:~?~.~;:::~./::.~::.:~i~/;~:~;~-' ~ ." "::~:~;:F.~:.5':::~': ~.~:y:::/;.;~;f;~;~;y~?;~.:~.:.cy;~;;~.:~:.f::~;~f~;~;~:;:~?~:::.;::~:~:/?.`~.;.;ffi~::.y~..;:~;.:f:.~:~:~:~;~:..~..:~:::.;.~ ':. ?::r:;:; .::.:;::.~..:"'~:::..'"t". ".:-:y:~ "';z:;:.:-.4:' ~.;?..; ': ;f.:" ....:- :::'4, ':': "'" ../: ' :.:f- :-:... ·' · . ' , ~ · '.', '~." ,' ,-,. ,, ',.,.,'-. .... , :?6'? '7),,-:4,-~.,'..:;,'-?...' .... .... ; .,. ,..? .... .,?. :'::.:...:.':~.;Z:'....'?.--':..".,,,.x:: -?6.' .,.,::'.:,'..::~,:~.:4..?:.;~;.;'q;..,...~-,-~.:~ ...?-..:.. ,~':.':..'.2..-.?:-.?;,?~-'.., :.'::~,..._- · :,-.: :..:', :.~'~:(?.'?~,~ ,.:x -'. :...' '?. _:~?, :,.... ,:.. ,. ?.... , ,.,~- ~....4-.. --'r:., ..'. · ' · ~ · . fl300 7879.zt8 7805.Q8 25 15 N 8~+00 7971.59 7897.59 22 35 N ssoo ,oe,,.oo 7~,o.oo 22 2o N ~.~. o ",: ~ 6'0 d':~::"~',::~ ,~::,-~ ~..S':4 :~4:~:?::~:L~:~:J;:~: ~:;~,:~:~:'~:::?~:;~: ~i;:~:~::.S.~ flgO0 fl~3~ .fir 8360.88 22 0 N 9000 8527,51 8~53.bl 22 15 N 9100 8620,28 85~6,28 21 ~5 N .zt2 I~2q.87 N I~27.9z~ W 2010.79 .67 1~56.77 N 1~50o28 W 20q9.56 .so ]~s8.~ N ].~7~.~ u i:::S:'~:s::;:.::~ :::::::::: ::::::::::::::::::: :::::":::: .41 1618.22 N l~6.1fl W 2234,62 .25 1652,07 N 1562,69 W 2271.08 l. O0 1685.S9 N 1578.~7 U 2307.05 ' PS-13-I COMPUTATION DATE PRUDHOE BAY FIELD UANUARY 23,~ ]979 SURWEL GYROSCOPIC SURVEY ,JOB NUMBER SU3-i63z+Q ................................................ ....... KELLY_ BUSHING ELE_V. =' ,...7~.Op FT. MEASURED VERT]CAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST SECTION ..... - . ,.....: .' , · .L. : . ..' :,::.:~: ~ ..................................... .,., .. ........ . :. . ,., ...... ........ ...,.,:,: ......... :....,....., .,....,;,........~.:....~.. .... :.. ~...,.: ....... . . :.:..,...~,..~ ........ ...,:, ,:.,:,.... ........ .;_..,, .....:.. , ,~. ~.... _: , ~:-:,. ...... .-~::. ~J' :.t.:,,: S ' ' 901~.28 20 0 N 21, 0 U 9600 90~7.~ .33 1851.76 N 1.6~..5~ W 2q76.!1 9700 9181.q0 9107.~0 19 30 N 21. O. W ,50 1883.30 N I656,65 W 2507,97 . 9808 . 9275,85 9201t~ )8 50 r N. 20. 0 { ~7~ )9]~'05.. N . 1~68' 15 ~ 2538.82 .......... : '~',~' 0: ~"::::,.~;~:/~??~:~:{:~:~0/~;:,T::~:~~ ~4~;:, ~ ~ ~ .~:~:~6~ ~. ~ s ~.: :'~:":':::::.?~: ~,4::~::~;.~'~.~:~'~;~:~:'~% ~:~ ~i~. ~ ~:~:~:~ ~:~~::.~~?::i~: ~ HORIZONTAL DISPLACEMENT =' ~G~].03 FEET AT NORTH~ ~fl DEG, 28 MIN. WEST AT MD .. ,, ,,,,. ,:..%::.:, ~:~:~;~:~.:::~.:~:.~.~:.~:..;~.~:~.~:~::;:~/~:;~:~`~:;:4~::::~:~:::~;;~:.~;~`:~::~:::~.~.~.~;.~:~:.~;~.~;.~.~:~:;:~::~:~t~:~;f~.~:~.::~::~:.~:~:~.~`~:~:~:~:~:~:.:~:~:~:~:~:~..~:~:~:~:...:.:~::~:.~...:.~::.~:...~..:..:.~.~..~:.~:~:.:.:.~.~....~:.~.::~:.~.....~.~.~:.::~.`.~.~....~.~..~.:.~...~:.~:~.:......~.~.~...:~.:~.~.~..~.~.~.~...:..~ ............. :...:..:.::....:. ............ ... ATLANTIC RICHFIELD EOM DS-13-1 COMPUTATION DATE PRUDHOE lSAY FIELD ,JANUARY 25~ 1979 ALASKA ~KA.:::..';.. ;.::..:~!.. ..... DATE 'OF SURVEY JANUARY 1979 JOB NUMIC;ER SU3-1634~ KELLY BUSHING ELEV, =' 74,0[} FT. TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL -. ..' .:. ::.:..::...:::,.:.~:.::~:.. .:. .::.::: :....::: .:.::::...~::::.:..:::.:: --~ lO00 999,99 925.99 2,61 S 1,80 E ,01 2000 1999,98 1925,98 q,63 S ,08 W ,02 .01 7000 6710,75 6636,73 982,53 N 1071.86 W 289.27 108.98 8000 760~.R7 7530,87 1326.79 N 1357.52 W 395,13 105,87 9000 8527,51 8q53,51 1652.07 N 1562.69 W 472.q9 77,35 .~- ~ .~.~<:::~;:>:~.6~:~.~:~:~::~~:~:~...;~<~.~:~:~:;:~:~;~.~.~`~:~;.'~6~.~::::~'.2 ~:~.~5:~:~<~:~::.:~i~o<0:~::~: ::::::::::::::::::::::::::::::::::: · TIlE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. A LAS'.KA. A!LAN1!C...RICHF!ELD COMP'ANY DA. TE .:OF,:SUR__V~EY JAN~_AR._Y 0S-15-] CO. flPUTAT ION DATE PRUOHOE BAY FIELD OANUARY 23, 1979 dOB NUMBER SU3-163q4 ......... ..- = 7~.00~ ' ~ '. '""I N'~'~:~'~'::~':~)~.~'A.:;Y E.O.: )~):AL}:~:?'E~: :..~F:~:~? ~::V~'N~:~i:~.~.:~?~[.[ :. TRUE SUB-SEA TOTAL .... NEASUREO YERT ~CAL VE.~T] CAL RECTANGULAR COORD IN ATES . ,.:.: ..::::,.. ...... :... ~...:......,~,:~::..~::~.:.~.::.:?.~::.:.:.::~:~::::.:~:~:.:~..~ ~;~ ~;~:~'.?~;~;:?~.~:;~-~-~:~:~;~:?';: ::;~.~.:.~::~..:;?~ f.~:.~::::~:. '--~ 74 7~.00 ~.00 .lO S ]7~ ]74.~0 lO0.00 .50 s ...... 2.7~..-. 27~,00 200,00 ... ..82 S 77/+ 10 12 67qo00 GO0, O0 2, 06 S ,86 E ,OD 776.00 700.00 2.~2 S 1.10 E ,01 ;~f ................. 8.7,.~.,0~.., eO.O, oO., .~,6~ ~ ].~ ~ .o~ 7q 1274.00 1200.00 3.11 S 2.33 E .01 .01 "'"~ "."'""' '.'" "~ ~." ~"'?."~'~".~'~'.~" '-"'- ..... "..."' ~- ""'~-' .S.~.~"~ S ~'"~ '~'~"~'~'~V'~ Y~'~ ~ ~'P-~ ~ '.. ?..',. ......... '.~'~..-..~: .... "~" ""'" ...... '" ' ' ~'~'~E ; ...... ' '". .' ' ',. ' ..'- "-.~ .~'~..~. "~.~.' '.~'..~'.'~.~.. "'" · '.~ '. ":.,.:. ~.x~ -." · · ~. .. ... .:; ~- "...'-.'.....x'.'-~ ..,: - .-,..X.'~.. "~ ... ' ~"' . ' .-. '..' '. ' ~ "'...' -~'..~'~ '.-~'~.'~'..~'~ ~.X.'...'?. ?.~.'~? ;':' :' ~ '-~ ':' . ' : ' '..-~ .. ". ' ~ ~' ' .'.:: ...... .... . ....... ,~?.~.~.~:~ '.~.,~...~:-.~,..~,~-..~ .~.~. ~.-~ .- ~. ~ ~?~.~..?~;~ ~..~-.'~ . . ~. ATLANTIC RICHF~'ELD"'C0~PANY ' - DATE.OF SURVEY dANUA~Y 20, 1979 DS-]5-] COMPUTATION DATE PRUDHOE BAY FIELD ,JANUARY 23, 1979 dOB NUMBER ALASKA KELLY BUSHING '-' ' - ,, .', *-, :.,, ,. :, ',:*:,r.-.".,'." .',.':.. ",':,"*.'.". *...*:':,~,:.,,:".':".'..:.-:.", :.:.~.:,, ':,,'.':.'..:.':,:*~.:..:.*,..,-;,'.:,':.:,'.*?, ..: ,'* ::".':.'..'.::. :..*'::-.'.:..*. ';.,,. -'. · :':-:.'.':., ':..',' .-..,.-:-:.':..,.':..., *,"-, .;:.-"-;.:'.:~.,.+..~,':,-::':? ..':.,.'>..:'.'?'.+'.-. ':<:-:','. :.':<.',?.:.';': .:::':. ': '.. -':,-' r...~: ::,'.:.,-: - -.:,. ',':.-o-' :'.:.:' ..? ?.?','.'.'.>'., '.. '?'. -.... '.- .',; TRUE SUB-SEA TOTAL HE ASU_R ED . VERTICAL VERTICAL RECTANGULAR COORDINATES ~ID-T VD VERTICAL ....... 's ............... 207~ 207~.00 2000.00 q.83 S .21 ~ .02 ,00 2 ? .00 2 00..00 s .02 .00 257~ 257q,00 2500.00 B,~6 S 1,29 E 267~ 267~,00 2600.00 9.51. S 2.95 277q 277~,00 2700,00 9,65 S q,l~ E ,07 ,0~ ~.~": '~ ."; '~:'.:;, ~'". ". -' ='"~' ;:"~;:';;:~.~:~.; :.<:~; :~"~' ~':"/'"~-~::.,~.': ~'::'?"'"/~/~<~;' ;:</~:~;~2~;<$;~:<Q~;~'"<:. "::);=""<~;~"~c'::~'~ ~ ~"//"':/:;~.~::.'~;:<;:~:7~:~.:~;/:<~:;.~-:~ :<<~::-;.~<:~.;.;:.~:e;:c;:.'4=c~:;'/c -""f :;'-"~:;:-.~:~c~"-~.~j:~:~;:::.~:~;:~ ~:<<.~,~:.~::Q:~=?:~.:;~;:~f?:-:~:.;'<':~':: :: ~'"~ ~':/~.- =/. ~. <.. ~ ;~ ~.:~<~/;'~:..;.:;<?: '~ ¢.:.-.:~ .~.. '?': :~<:~h~:~:,/~'~ :-./~ ~ ~/~:.i .... ~. -:.. ~....: ....--..: .... ' ,.:. -.., - - -... ,... ,. '. :.. ..... 3~77 . 317q.00 3~00.00 16.79 N 27.88 ~ 3.33 2,05 32~0 327q,00 3200,00 31.06 N 50.56 ~ 6.87 3.5~ 3385 337q,00 ~00,00 ~8.9~ N 75.21 ~ ll.qO q.53 \ ATLANTIC RICHF!ELD cOMPANY · ~":.'P.~'GE ~ :ALASKA '.. E OF SURVEY dANUARY 2.0.'~' 1.979 0S-15-1 PRUDHOE BAY FIELD ALASKA COMPUTAIlON DATE JANUARY 23~ 1979 ,JOB NUMBER SU3-16 ........................................... i .... : ,.oo --~,'~ 3910 ~015 4120 T RUE SUB-SEA TOT AL ME A,.gUR ED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVO VERTICAL H ....... , , - .,,,.-,--"- .... :.' . .,.. ,. '~., .~ .... ~ ·- . J ,- .~ ........ ,u ................ ,.. · ............ , ...... 387q,00 3800,00 lq0,76 N 20~,'89 W 56.05 5,13 397~,00 3900.00 159.89 N 251.59 ~ ~1,31 5,26 ~07q,O0 qO00,O0 179.~6 N 258,53 W "~?~.~:?";"' :?; ~".'.:'::'::":~?~" ? "'~; ?":T;;;~?:::? :':':~ ':-?".." ":/? .... i:~"?:.'":~;'":'::'?~:" ........................... ." LL' "'..:~:.:;~?.;:;:?~::;~.?~<:.:;:<....: .w:'.::'.:~, ·.' '~i;/-i?;:;¢{.::<~;~:::~:2777~:~ <.i'; ~':.: :>:~ :;{~'"-..:;~;L~:~?~:~:~'::::;;::~<~i;;~:~:.< ?'_ .'.~; ./'.' ":.' "': '"'<. >.:<:' ".?{' ?..t::'T.::..~:.'..r:.' :-..'~ :.':.?-.:..::..;.;::? ~.-.': ?.... ~ : ': . ~5q3 q6~9 ~755 ...... ~S'sd ~9 68 ~075 5183 5290 5398 ztQT~.O0 ~OO.O0 261.38 N 36 7.5z~ ~+57 ~,00 Q500,OO 283,06 N 395,12 q67q,O0 ~600.00 306.9q N ~21.76 507~.00 5000,00 ~[].9~ N 5~0.08 5174.00 5100,00 ~O.3B N 558.09 527~.00 5200.0u ~69.80 N 586,58 69,31. 5.86 75.29 5, 98 81.50 6,21 i!:.i::iiii'..::'.~ ~'.'~.>~?:i? ~i~:-:::~iiii!!~?'~!'~::~i!~i!!i~:i!iii? i~'~i, ~:'ii:ii :~..:~. <~ ~.~'~:?f.' !<!~ ~"~i'i?:i :i. '>i i::.!~ :.::.. ::>i ~>:>!!:/!':: <.: ? ~' ~,:' ::.';::: :' · <._~',_,~-?,:..~...?:. ~.: ......:.. 109.01 7,33 116.67 7.66 :':':. :'::" :::": ::/.i' .'i' :"::i' '. '~':' :.':'- :"!:: ": ':i :'~"":;::A:N'C'HoR AG E:i:i ~''A'L AS K A ' · '-:.~,~ ::::i:!i:i'i':" ::..' ' ATLANTIC RICHFIELD COMPANY DATE OF SURVEY dANUARY 20~ 1979 DS-I~-I COMPUTATION D/~TE PRUDHOE BAY FIELD ,JANUARY 25~, 1979 , ,JOB NUMBER SU3-165/+q ALASKA KELLY BUSHING ELEV. = 7~.00 Fl'. TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL ...... -... _ _ :..::- . ...... ~.._~,, .................. ~ ......... . .... , ........ ._... ...... .;..~...,_ .- ..... . ............ ..., .r-=-.-.....-c...-.,,...:.......-~-.'~.%:....~.- .... · ...... ~-. -..:, .- .... .....~-_-.q.-.-..' -..' "~..--.... ....... ..:.~-..-.~..-..-. ,.-d ..... ~ ....... , ... ........ -. ....... ..v .... . -,. ,~,- '. ........ ,-,- ~. ?. '-~ 59~9 577~,00 5700.00 636,19 N 7q5,22 W 175,1.5 10.99 6060 587~,00 5800,00 671.26 N 779,09 W 1~6,~1 11.26 6171 597~,00 5900.00 706,53 N 813,15 ~ 197,78 11.37 6619 637~.00 6300.00 855.36 N 951.97 ~ 2~5.93 12.3~ 6732 6~7~.00 6~00.06 ~91.29 N 987.33 W 258.58 12.65 6~5 657~.00 6500.00 929.60 N 1023.05 W 271.~6 12.89 . .:-. : .... ~t ............... ~,.~,,.. ....... ,s-,-, ......... ,,--..-,.- ......... -.-. ,... ....... '--,-. ..... ","-,-~ '. ....... ~.. ....... ..-,"-:..,~-.'.,,...-',.,.:-:.-.'.:.,'.-~.-'~..'",. .... ~' '-: ..... ~ .... -:'. "'.-"~ '~'. '."~ '"" "~' ~,"--: '.~.--.'...'.'-- '--,'.--'.-'-'. ..... :.' '.: , · '"' '"-' ~ .""-''" '~ ' .......... '~' -'":'.:." '' .. '.-~ '""''- ...... ,, ,.,~... . :, ·, , ,, · ..,....,. ,,, .......:.: .~ ,........., , :: ,. ...... ,, ~... ,....,.. :. ,.....:, ,..,... ,.... <.. .,, ... : ,- . ...;.,,..: .~., .:, .-..:. ,:.::.:....,........, .., ,.... :.....,...: ...... ,.:........ · .. :... , ....... :..:....:. ::..:. :,...<:.. :.. ...: . ~ ' · .... . ...... ,....: :... : . · ,.: .... , .:...... ·: ......... 69 58 '? :::.:,~:'::..:~.: 66:'~;'~':.,'0< ~::~:::~:~.:;~:~`:~:~:~:~:~;~:~:~:~:?:::~;:~::::~;~::~:6~:~:~::~;:~::~.~;~ ~::~8:~:~:W~:;~::~;:~::::::~::;:::~:?:~;~:2~8~":`~::::~~;::::~::~:~::~::~::~:::1~ ..,.:' ~' O-G:.? ':::~.:~:~.,~{~.:~:.-::.::.:?.-::.:..~::.--::...: "~" 7297 6978.00 6900.00 1087.06 N 1162.76 ~ 523.~9 12.89 7~09 707~.00 7000.00 1126.56 N 1195.90 W 336.00 12.51 ~.A_NTIC .fllCHFIE'.LD..C. OHPANY '-'' ""::""- '- .......... D-ATE.:.:O,F,.S.'URVEY: dANUARY 20~...1979. DS-13-] COHPUTATION DATE PRUDHOE bAY FIELD UA'NUARY 23~ 1979 ,JOB NUHBER SU5-163~t ...... ALASKA ....................................................................................................................................................................... KELLY I~USHING E.LEV. =, 7'4.00 FT. .... true s u~-sea Tot AL mEAsuRED VERTICAL V E R T I .C...A ..L,. R~,cTAN~u, LA,r coo. r D _!,,N.. AT,ES ~D-TVD v£~tt cA,,L '~ 8075 767~.00 7600.0~- 1351.73 N 1376.09 k~ ~1.81 9.73 818~ 777~.00 7700.00 1387.33 N 1~01.65 ~ ~10.99 9.18 8726 fl27~.00 8200.00 ~83~ 837~.00 B3OO.DO ~59~.12 N 15SS.2fl ~ ~E0.32 7.93 fl9~2 8~7~.00 ~00.00 1632.~3 N 1553. 11 ~ ~8.20 7.87 ~~ ~ ~ s ':~'~ ~ ~:::; ~:0:': ...::;~::<2~;~:::o~'t.~d>'p:,..~;~.~ :'?:.~:'~./?: 9372 9q 79 9585 gTg~ 0903 887lt.430 8800.00 1777.92 N 1616. 19 U /+98.53 7.15 897~.00 8900.00 1812,'86 N 1629.60 ~ 505.30 6.77 907~,00 9000,00 18~7.2~ ~ 16~2,88 ~ 511.87 6.57 ::. ~'~ ~ ','~ 0 ::~:~::~:~-;":f~::/.~<::~:.;~f~'~:::~: ~:~?f~:</:S..~:; ~ ~: :'~ :~Of'~<~:~:;;;~ :~:'L~::'f~:.~:~::. ~' 5~:'~::~ "::.'::::~:' "?; <-.::.:? ~'.': .' t ":-: :.::...:.~: ~:- :~' : ATLANTIC RICHFIELD COMPANy ' : ...... DATE''i!:O'F 'SURVEY UA.NUARY 20~ 1979. OS-I~-I COMPUTATION DATE P~UDHOF BAY FIELD UANUARY 25~ 1979 ,.JOB NIJMRE'R SU3-163~zt ALASKA KELLY ~USH]NG ELEV. = 7~.00 FT. IrN.TEEPOL~!ED VALUES FOR-' E..V_[N_:~.O~-.--[E._ET__~F:~L SU_~-SEA .DEPTH TRUE SUB-SEA TOTAL NE ASIJRED VERTICAL VERTICAL RECTANGULAR COORDINATES P}D-TVD VERTICAL ----D ~ '~ T '~'-'-:--'r' ;i f ::';:f:~' :.~ ::0"~:. ~i:~ ' ~iii;'?:i::::;~';!ii?':';~i';!:!i:i!i:!:~:!i-::'~': 61:~..:~r ' ~::; :~! -i!:i::i';-i!.i!?.~i::~.0:. !~: T :.~:'~i:S::~ !0::~: H:: :ii:i E: ~' ~:~:~:.:.~ :~ ~::~.~;: ~ ':~:.::~?~:~' E'/:~ E:.~:-:~;::~'~C: ~; ~?~ .~: R?~ C 'T f]:6 N~o~::. :.?~... :' ~::- .:~: ~: "' .~.-::':-: '-.'~ ~ ;: .:;:'::~':~::';/:..~:::'': '-:::~;'.: ':. '~:~::'--?;-: :"' ~.::" ~: ?' ............ ...... ~ 10050 9513,73 9~39,73 1986,10 N 1.694.,97 ~ 536.27 1,89 · :D' 'O F: ':i: S UR VE Y ,JANUARY DS-13-1 COMPUTAlr ION DALE] . ' PRUDHOE [~AY FIILLD .JANUARY 23~, 1979 .JOB NUMBER SUS-1G;~qq _.__~,..A~EA .................... ~- __ ... KELLY DUSHING.~_.F,.L:~ ~ 7~,00 ET,, . TRUE SUB-SEA TOTAL ____~_LASUfl ED . VERTIC/~L VE R TI _C./~L RE ~ TANGUL.~..R COORD !NATES ......................................... --'~' 9916 9385,92 9511.92 19qB,q7 N 1680.67 W BASE SADLEROCHIT ............... " .............................................................. '"'- ............................. DRILL SITE i$:1 ......................... 4oo ................. ...... .:': ...................... -7'-::: ............................... .................................... coo ................ I~00 ......................................................................... ................... t600 - ' ............................................. :::: ."-' .".:':.-:.: ..... ':':-:! .'.:::::_-~.'. ' _:-:.': _' _ '!:_..:: :. ::_ .: :_ ....... · ................................... _'. ........................ ~ .................... _~. ............... : ........................ ...................................... 2400 ................... : .............................. ~ ...................... ~ ........................................................... " : :._. -_~.- ........... _* L: /_ .: .-_ ::::/ ..... ' ~eo0 .' _:':'-:' ::X: ".i'::-. -/::::::::::::::::::::::::::::::::::::::: ....... ::.:i.L:' 2-_£.::.'::....:.'_: ....................... SHOWN ...................... 3200- .............. $600, .............................................. 4000 ., .................... .~, ' ........... _ATLAN.TI.C2_, RICHFIE'LDL, CO .._ Eastman Whipstock' l A FE7'ROLANE REPORT Of:¸ SUB'SURFA.CE DIRECTIONAL SURVEY ATLANTIC RICHFIEnD CO. ~ 11, i , -- , , COMPANY D. S- 13-I WELL NAME. ' ' ' ' Prudhoe Bay, Alaska ..... LOCATIC)N ' ' .- .... -- R-E C ~:I \,,.E D ,JOB NUMBER -TYPE' OF SURVEY- AIi78 0004.8 Directional__ _ .'-.'": '"" "...:'"'' "" :..~,: -.,,i: ..' .... .. :.'" i~ ".".,'.'. -. .... . ::;'" '"'" -/ ......... _ ,.. . , ' ~.' .~ ':· . 7.':, ~' '.--~. .,' . . .... .. . ..... , -:. _ . -. , ; ',,.: '. : . .. .... . . ._ .. .._ : · · -- SURVB"¢ BY' Ke~.. Walker OFFICE Alaska DATE 1.I-2.7-78 COMPLETION REPORT .i DEC O5t 1978 ATLANTIC RICHFIELD cOMPANY ',. WE, LL DS 13-1 · ' _.. ~4AGNETIC'SINGLESHOT SURVEY DECLINATION 3! DEG. RADIUS OE '~URVATURE M[THOD OF COH~UTATION5 ' K,B, ELEV, 74 FEET EAST COMPUTED FOR EASTMAN WHIPSTOCK LINDSEY AND ASSOCIATES , RECORD OF SURVEY ALL CALCULATIONS .PERFORHED. BY I B M ELECTRONIC COHPUTER t DOG LEG !' TRUE _ MEAS. DRIFT VERTICAL .SUB DRIFT DEPTH ANGLE ' DEPTH .... SEA DI.R. EC D.. M DEG~ TOTAL CQQRDINATES C L ........ 0 ~ U R E S SEVEfilTY SECT~'"'~ ,, ~' D 1.5. T. ANCE ANGhE DEG/),OOFT DIS1..,CE) D M S ~ t o o o ~0o0 0 . 1060 .. 0 15 __. 2705 1 0 · ~ _ 2767 '1 0 2881 3 0 o.oo -74.oo ~3.~,OOE, . 9.0o .r ,.500.00'., 42.6~00 $3.2'~00E 0.00 1059,99:;'985,99 532.OOE ,'m !*03m 270~,i,2~30.88,,, 5~,,ooE t3~,~1 , 2766tP7.,2~9~.87,1,. N86.00E 1).87.S ~880.80 2806.80 N O,OOW 11,22 0,00 W 0.00 $ 0 0 0 W 0,000 0.00 0.00 W 0.00 5 0 0 0 W 0,000 0.00 0.6~ E 1.22 S 31 59 59 E 0,045 -1,19 t3,,.22 E 1~.9~ $ 44 ,,10 13 E , Q.046 -18.98 14.25 E 19.89 S 45 47 13 E 0,997 '19.88 16,72 E 20.14 S 56 7 22 E 1.767 -19,71 2975 .5, ,~0. ~97~3, '2,90q,531'NS~.OOW .5~,,24 S .. 3036 ..8 .Of 3035,11.' 296t,3~ N60~OOW .... ~,~4 5, 3097 10 30 3095,31 302~,31 N59,00W 3,62 N _~ 3160 13 30 3156,92~ 3082,~ .N~g,OOW [Oe~7 N. 3222 15 30 3216.95'.31142.~95 N59,0ow 18,~6 N 3507 .17 45'3490.01 1341~.01 N46~00~ 67,89 a . 3972 18 0 3932.57' 3~58.57 .... NS~OOW' 15~,56 N ,1.3,67 E' 7.66 E 14.65 5 69 0 10 E 2,711 -13,30 7.78 S 80 2 13 E ~,103 -6,31 0,77 W 3,71 N 12 6 45 W 4,099 3,14 . 1,~,00 W 15.86 N,49 10 2 W 4 25.3! W 31.27 N 5~ I 47 W 3 89.85 W 11,.2.~62 N 52 55 29 W · .:.10 ' 199,10 ~Y 255.15 N 51 ~,7 25 W . O 4469 gO 0 4,402.~7 4328_,~7 N.~ .. 4595 20 15 4520.77 ,q~46.77. N53 ,762 15,80 .226 30.81 · 89~ 111.33 ~173 253,2! ,402 412r~ ,. 640.92 970.07 1078.18 1298,52 1356,22 1585.20 ....... 1638,06 1875,09 1920,55 · OOW 254.67 N.i 330.00 W · OOW -280.45 N m 31..6.4,85. W 416,84 N 52 20 30 W 0 5121 21 30 5012.24 ~ 5463 23 0 5328.76 _ 5959 25 0 5781.86 _ 6211 26 . 0 6009,31 ,.'6701'27 30 6446,.~5 6826 27 30 6,~57,73 7322 27 30 · 6997,6~ 7437 27 15 7099.81 7976 25 0 7.583~.71 ~ 8086 24 0 7683.81 4938,24 N52,0'QW 394,55 Fi ~i)',5~ W 5254.76.. NSI,OOW 475,16 N 61~,8~. W 5707,86. N49,OOW 604.82.-N. 769,41 W 59~5,3.1 N4~.~.gOW 67~,0Q,~l 8.91,29 W 6372,85 N~3,00W .. ~29,13 N lo09,86 w 6483,73 N43.00W e71~34 iN 1049~22 W ,692~.~69 .... N43.00W 103e.8~ N -1~05,~ W 7025,8! N~3.00W '1077.5.! N 12,~1,~8 W '7509.71 N~O,OOW, 1255.24 N 13~,8~72 W 7607.81 N39.OOW 1290.~.~ N. 1427.73 W 6.47.61 N ~2 27 54 W 0,239 777.00 N 52 11~ 15 W 0.4,41 978.68 N 51 49 46 W ' 0,410 1087:04 N 51 3~ 50 W ~;397, 1306.63 N 50 36 45 W 0.402 1363,86 N 50 17 29 W 0,000 1591,3.0 N.49.14 41 w o.ooo !643e8.7 N 4? 2'39 W 0.217 1879.37 N 48 5 40 W. Q...429 1924.~9 N 47 53 29 W 0.921 RECORD OF SURVEY ALL CALCULATIONS PERFORM[D BY J[ B H ELECTRONIC CONPUTER TRUE DOG. LEG ' ~EA$. DRIFT VERTICAL .SUB DRIFT ' TOTAL COORDINATES C L o ~ U R E. S · SEVERITY SECTION i DEPTH ANGLE DEPTH . SEA DIREC DISTANCE ANGLE DEG/~OOFT DISTANCEi D H DEG~ D M. S , 8705 20 0 8257.62 8183.62 N:~:~O-OW ' 1~+77~,91 N 1.56:~.94' W 21.51.77 N ~6 37 12 W -- .10055 20 0 ~526:20 '94~2..,,2.,,0 N33.OOW "1865,,1,5 N ~B!5.~+! W 2602.79 N 4~+ 13 33 W ' 0.656 21~9.90 0.000 2607"'~.9 ' BOTTOM HOLE CLO$.Up, E 260.2,79.. FEET...AT N 44 13 3,3, W , i D~... 05, 1978 _ . HEASURED DEPTH AND OTHER"!)ATA F~R .EVERY EVEN ln_O FEET .0~ SUB SEA DEPTH. ., TRUE ,, 'MEASURED VERTICAL 5,U,B , HD-TVD ....... DEPTH ' ' ., DEPTH SEA,DIFFEREN.,CE 'CORRECTION TOTAL COORDINATES, , 174 ' ' 17~,~ 100 0 0 ~74 . ' . 874; .20o o o . .37~.. . ~7~..~ ' 300 . o ~ 0 0 0 474 47~, ~00 0 ,57~ .... 57~'~, '500 0 0,00 ~ 0.00 W o,oo $ 0,00. W o,~qo 6 q,O0 W 0,00 $ 0~00 W 0~01 S 0.01 E ' . ,,, ~7~ . ' §76,,, , , 600 0 ,, , .O ~ 77~ 7'7~,; 700. 0 0 87/* 87~, 8.00 0 0 974 976. 990 0 1074 1074, lOOO 0 117~ .':..~ ~!7~,..IlqO 0 127~ 1~74. I~O0, .', 0 1374 : .'- ..- 1~74, -1300 O 1474 - . 1474, 1400 0 01,10 5 0,06 E ,' 0.2~ S 0.19 E 0.~6 s o.2~ E 0,74 5 0,4~ E . 1,o8 5, 0,68 E 1,49 S 0,94 [ ', 1,9~ ~ . 1,2~ E, . 2e4~ ~ 1.64 E ,, 3,06 $ 2,08 E ~1574,, 157~.~ ','15oo 0 .~676 ·., ,!674' 1600 0 3.69 $ 2~5~ [ ' 4,37 5' 3,15 E,',,: .. 5.10 5 3,78 E 1774 1774. 1700 0 5,87 S 4.48 E 19~4 · !974, 190'0 0 2074 ~o7~, ~ooo ~17~ 2i74~ ...~0o 2274 2274. 2~00 2374 2374, 2300 2~74 2474~ 2400 , Q 2574 2574, 2500 0 0 · 6.68 5 0 0 . 0 0 0 0 9,34 S 0 0 5.25 E 7,~'s 6,1o ~, 8.42 ~ .7,0Z. [ 8.02.~ 10,29 5 9.09 E 11,~7 $ IO,ZS'E 12.27 $ 11.45 E 2674 267~, 2600 0 0 13.29 $ 12.80 E 2774 2774. 2700 0 0 13.87 $ 14.38 E 2874 2874. 2800 0 0 15.85 5 16.93 E 2974 2974. 2900 0 0 5,31S 13.73 E ~075 3074~.. 3000 1 t. 1.66 N 2,51 E 3178 3174, 3~00 3 2 12.53 N 15,59 W 3281 3274.-- 3200 7 4 26.93 N 38.82 W 3385 3374, 3~00 11 -3490 347~: 3400 16 3595 3574,e .,, 3.500 21.. · 4 44,18 N 62;~.3 ~ . ,5 64..37 N 86.09 W , . 5 86.30 N 109./~2 W - ARCO. !D.! - "' ' ' ~AG~,FTIC. A.INaLE_~.HnT SU~U.F¥ · . . t;1EASURED'DEPTH AND OTHER DATA FOR'EVERY EVEN::iO0 FEET .:.OF.. SU~ 'SEA TR, UE - , MEASURED .: "/'. VERTICAl...SUB ND-TVP DEPTH DEPTH SEA DIFFERENCE VERT][(;Ak .,, CORRECTION T, OTAI. COORDINATES 3700 3674, 3600 26 .107.63 N 133,46 W 3805 3774. 3700 31 128.26 N 158,24 W . 3910 3874, 3600 36 401~ 148.16 N 183.73 W 3974. 3900 41 167,52 N 210,05 W 4!2! · .. ..... 4227 4333 4439 , ,4. 54,5 '4652 '4750'- .... 4866 4973 5080 4074...,. , 4000 . 46 187~06 N 236.95 W 4174, -4100 9-2 4274, ,4200 5~ 437~, 4300 64 .. 447~, . ~400 71 457~, , .~500 77 4674, 4600 84,: 477~. ;4700,, ,9! '."::. 487~! 4~00 98 227868 N 292,86'W 24~.60 N 321,65 W 270.11 N 351,02 ~ 29~.33 N 380e57 W 31~.84 N 410,23 3~8~1o N , ~4~.64 36~.53 N 471.04 ~:t.7 · 5295 ,'" .,. 5404 5512 5731 5840 .59.50. 6061 4974. 4900 105 5074, 5.000 113 · 6172 · 62,,8,3 6395 6507 ~. ', 6619 6732' 5274. 5200 129 ~74~.. 53,0p, t38 5474. 540'0 !47 5574, 5500 156 567~., 56Q0 .... 166 5774. 5700-, ~76 587~e ,,.5800 ~86 7 385.33 N 501,72 W , 8 409.57 N 532,70 W 8 434.70 N 564,47' W " 8 460.66 N 596,91 W · '. J · . . .. 487.28 9 N 627,8, o, W - N .' 663.27 W 9. 514.79 ,.':. "" .,. 9 543,30 N 697,43.W "'" - ,5,7.2.:3.1 N , 731,,65 W. .. 602,34 N 766.54' W' 10 10 10 N ,19 W 11' 664,74 N 838,33 W .... , , , 12 696,97 N 875,04 W 730,65 N W ' 633,32 802 W 801.82 N 983,87 W !1 911,71 12 765,60 N 94B,00 839.46 N 1019.49 W' 5974~·-'. 590.0· 197 6074, 6900 209 6~74. 6~00. ~3~ 6374, 6300 244 6474, 6~00 258 12 14 6844 6957 7070 , 7182 7295 7408 6574;,,., , ,,650.'0 ~ 270 , 6674, 6600 . , 283 6774, 6700 .. ~..9.6 6874, 6800 ~.08 . 6974, '.6900 321 7074, 7000. 336 ,1,2 ,, 13 877842 N .195~.89 953,68 N . 1126.0.0 , 99~!56 N, 1!~1.33 1029,72 N 1196.92 1067e78 N 1232,~0 T ; TRUE MEASURED ' VERTICAL. SUB f'.tD-T VD DEPTH' 'DEPTH SEA DIFFERENCE VERT I. CAL. CORRECTION TOTAL COORDINATES 7520 7{74, ,7100 346 12 1105.35 N 1267.22J W 7632 7274. 7200 358 12 7744 785P 7965: ' 807,5 818,~ ,',829~, ~,~01 7374, 7300 370 7576. 7500 39.1' ' 7674', 7600 401 7774, 7700 , 7.87~,'... 780:0.. 4t9 7~7~,.' 7900 '~27 1.0 10, -' ~ ~) , 0509 ' ' 8616 6722 6829 .,.-. 807~..~' ~ 8000 435 8i7~,,. 8100 0~74, :.: 8300. 8474e' 8400 461 - 6 1!42,55 N 1300,99 .,W 1179;~,6 N 13}3.,67 W 1215.76 N 1~65.26 W 1251,67 N 1395.73 W .. 1286.95 N 1~2~.91 W 1~21,38 N 1~52.3fl W 1355,08 N .1~Tfl,25 W 13fi8~11 N 1502.64 W 1~20,4~ N 1525.55 !~52~0~ N 1fi~7~0~ W 15i3~6~ N ' 1587,01 W 1543,8~ N 1606,~8 W 9042 ', 9!48 925~+ .' 8,57~., 8500 :'.468 8676, 8600 877~., 8700 480' 8800 7 1574.48 N ' 1626,66 W 1604.98 N 16~+6,..46 w , 1635.39 N 1666.21 W .... '"" 9361 8876, 487 7 1666.06 N 1686,13 W 9467 897~, '8900 493 6 1696,48 N 1705.88 W 9574 9076, 9000 ---500 7 1725.77 W 1727.11 N 9680. ,. 9!76: 9,,100~, :506 9787 "9274' 92.09. ,5!3 9893 . 9~7~,e, ' 930.0 ..- 5!9 '9999 9474,, .9.~00 525 6 1757,58 N 1745,56 W 7 1788,16 N 1765.62 W 1~,49..0~ N ).80~+...9~ .W ARCO NTERPOLATED VALUES FOR '.EVEN 1000 FEET PF NEA.~,U,,,R.¢~ PEPTHe DFPTH 'VERTTCAL ~UB · , 13EPTH SE'A TOTAL 2000 : · 3000 '. ,~noO . _~ AO00 · 8000 9000 10000 999- 9?5. .... 0.82 5 ,,' ,', OaS1 1999i : .1925~ · '6,90 S' ~47 2999,. ' 2925. 3,75'5 "- .11,52 ~59~ 3885~,, ~66. N' ' 206,12 ~899,.. 4825-, 367,50 N -~'~ 478,76 5~1~. 5744. ~ 615,2'3 N ~ .7fl2.53 67t2. ' 6638. ' 930,10 N ,t/~110~.02 7605., .7,531.'. ' 1262.99 N"Y"/1405.20 8534.- 8460' :, 1562'53 -N ~i1618,89 ' ' ~ ~ . ~ I : : .- : COMPLETION REPORT ATLANTIC RICHFIELD COMPANY MAGNE.Tt£..MULTISHOT SURVEY RADIUS OF CURVATURE METHOD OF COMPUTATIONS COMPUTED FOR SDC BY F,N, LINDSEY AND ASSOCIATES !1-50-MNS-079 DEC 06. 1978 WELL DS 13-1 DECLINATION 31 DEG. EAST K.B, ELEV, 74 FEET RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC CONPUTER TOTAL COORDINATES 23,97 S 1 20,' 37, 54~2 71,30 N 88.29 N 106.18 N 124.19 N 142.,01 N 160.21 N 178,0b N 196.24 N 214.25 N 232.05 N 250.50 N 268.98 N 287.4'8 N 306.84 N 326.63 N 346.90 N CLOSURES DISTANCE ANGLE D M S 1.26 E 24.00 S 3 0 92 E 0.75 W 25.16 S 1 42 37 W 5.55' W 22.24 S 14 27 0 W 13.94 W 20.63 S 42 30 58 W ~ ~'~ . ~ .... m~ 69.90 N 73 1 6 W ~'%"'~J 95.9, N 67 17 48 W 151.06 N 61 50 6 W 179.02 N 60 26 48 W 207.45 N 59 12 44 W 236.16 N 58 16 13 W 264.60 N 57 32 23 W 293.69 N 56 56 22 W 322.93 N 56 32 12 W 353.09 N 56 14 3 W 38~.34 N 56 I 6 W 413.60 N 55 52 14 W 444.22 N 55 40 21W 474.90 N 55 29 59 W 505.97 N 55 22 37 W 537.74 N 55 12 25 W 569.84 N 55 1 34 W 602.72 N 54 51 39 W TRUE HEAS, DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DIRE¢ D M DEG. 2750 1 0 2749,91 2675.91 S 3.00E 2844 2 ~0 284~.~86 2769.86 N58.OOW 2936 5 0 2935.65 2861.65 N48.00W 3029 8 0 3028~05 2954.05 N58.00W 3123 12 30 3120.52 3046.52 N56.00W ~216 !5 0 3210e85 3136.85 N57.OOW 3402 17 15 3389.34 ~315.34 N52.OOW 3495 17 45 3478.04 3404.04 N52.00W 3588 17 45 ~566.61 3492.61 N54.00W 3680 18 0 3654.17 9580.17 N52.OOW 3773 18 0 3742,62 2668.62 NSI.OOW 3866 18 15 3831.01 ~757.01 N52.00W 3958 18 0 3918.44 3844,44 NSI.OOW 4052 18 15 4007.78 3933.78 N52.00W 4145 18 30 4096e03 4022~03 N53.00W 4299 19 0 4185.05 4111,05 N53.00W 4332 19 0 4272.98 4198.98 N54.00W 4425 19 0 4360.91 4286e91 N54.00W 4518 19 30 4448.71 4374.71 N52.00W 4610 19 30 4535.43 4461.43 N54.00W 4702 20 0 4622,02 4548.02 N53.00W 4795 20 0 4709.41 4635.41 N52.OOW 4889 20 0 4797.75 472~.75 N52.00W 4983 21 0 ~885.79 4811.79 NS'2.00W 193.17 W 155J73 W 178.22 W 200.86 W 223.26 W 246.14 W 269.40 W 293.53 W 317.87 W 342.37 W 366.85 W 391.38 W 416.37 W 44-1.60 W 466.94 W 492.88 W DOG LEG SEVERITY DEG/1UOFT 0.000 1.616 2.719 4.788 2.689 1.668 0,538 0.656 0.342 0,~32 0,289 0,291 0,286 0,290 0,532 0.350 0.000 0,589 0,726 0.558 0,368 0.000 1,064 SECTIC DISTANt: -18,09 -17,54 -11.60 -1,22...., 15,07!' 36,66!:.... 61,17 88,16 115,86 143,87 171,77 200,27 228,96 257,3,~ 286.33 315.33 375.05 404.88 435.17 465.51 496.18 527.64 559.49 592,09 ARCO 13-1 MAGNETIC MULTISHOT. SURVEY RECORD OF SURVEY ALL CALCULATIONS PERFORNED BY ! B M ELECTRONIC CONPUTER 5915 26 0 ?~741e14 5667,14 N4g,OOW. ~009 26 0 582~e6~ ~7~1,6B N49,00W 6102 26 15 5909.13 5835.13 N49.00W 6195 26 90 5992.45 5918J45 N48.00W 6288 27 0 6075,49 6001.49 N47,00W 6381 27 0 6158,36 6084.36 N44.00W 6474 27 0 6241,22 6167,22 N45.OOW 6566 27 0 6323,19 6249.19 N45.00W 6658 27 30 6404,98 6330.98 N47.00W 6751 28 0 6487.29 ' 6413.29 N47.00'W 6845 28 0 6570,28 649.6.28 N46.00W TOTAL COORDINATES TRUE MEAS., DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DIREC O M DEG. ~.077 21 0 497,.55 4.99.55 N52.00W 5!70 22 '0 5060~.08 ?4986.08 NSOeOOW 389.09 N 526~ 22 0 5~7.,2'3 5073.23 NSO.OOW' $11e72 N 53.56 22 30 5232'38 5158.38 NSO.OOW 5449 23 30. 53~7.99 .5243.99 N~9.00W 5542.24 0 5403~11 5329.11 N49.00W 5635 2~ 30 5487~90 5413.90 N49.00W 5728 25 0 5572.36 5498.36 N49,00W 5822 25 30 .~:5657.38 5583.38 N49.00W 519.42 W 545.91 W 572.88 W 599.57 W 627.20 W 655.47 W 754.96 N 957.95 W 784.49 N 987.48 W 813.76 N 1017.78 W 843.29 N 1049.45 W 873.6~ N 1081.46 W 904.54 N 1112.33 W 936.14 N 1143.39 W 6938 28 0 6652.~0 6578i40 N44.00W 7032 28 15 6735.30 6661.3C N45.00W 7125 28 15 6817~22 6743.22 NA4.OOW 967.54 N 1174.24 W 7219 28 0 6900e12 &826.12 N44.00W 999.41N 1205.02 W 7311 27 30 6981.54 6907.54 N44.00W 1030.22 N 1234.78 W 7405 27 0 7065ell 6991.1! N43eOOW 1061.44 N 12~4.41W 7498 27 0 7147e97 7073.97 N44.00W 1092.07 N 12~3.47 W 7593 26 30 7232.80 7158.80 N43.00W 1123.09 N 1322.90 W 7687 26 0 7317.11 7243.11 N42.00W 1153.74 N 1350.99 W C L O 5 U R E 5 DISTANCE ANGLE D M 5 434,11 N 457.71 N 482.29 N 507~5 N .- 684.29 W 532~I)9 N 713.68 W 559 !0 N 743.94 W 585 ~774.43 W 666. 724e85 N 928.95 W 1177.82 N 52 1 3 W 1219.69 N 51 45 29 W 1261,~7 N 51 32 5 W 1303.~0 N 51 21 22 W 1~46~29 N 51 12 58 W 1390.27 N 51 4 0 W 1433.69 N 50 52 56 W 1477.7~ N 50 41 28 W 1521.50 N 50 ~0 45 W 1565.54 N 50 19 43 W 1608e12 N 50 9 37 W 1650.88 N $9 59 13 W 1692.83 N $9 $9 32 W 1735.34 N ~9 ~0 12 W !776.60 N ~9 30 10 W 636,36 N 54 42 34 W 670.38 N 54 31 16 W 705e49 N 54 17 44 W 740.23 N 54 5 37 W 776.46 N 53 52 44 W 813.78 N 53 39 16 W 851.86 N 53 26 46 W 890.68 N 53 15 7 W 930.67 N 53 4 8 W 970.98 N 52 53 59 W 1012.09 N 52 4~ 28 W 1052.96 N 52 35 44 W 1094.17 N 52 26 28 W DEC 06, 1978 ' DOG LEG SEVERITY DEG/iOOFT 0.000 1,117 0,000 0.543 1,089 0.538 0.538 0.538 0.532 0.538 0.000 0.269 0.344 0.582 1.464 0,488 0,000 0.714 0,538 0.499 1.010 0,357 0.509 0.266 0.543 0.575 0,488 0,567 0.570 SECTION O I STANCE 659.2 694.32 728.97 765e14 802.46 840.52 879.31 919.26 959.51 1000.57 1041.37 1082.56 1124,34 1166.55 1208,77 1250.53 1292 1335~8 1379.96 1423.62 1467.93 1511,94 1556.25 1599.09 1642,13 16.84,35 1727.10 1768e66 ~ ARCO 13-1 1 '! TRUE · ~IEASe DRIFT VERTICAL ~ DEPTH.ANGLE DEPTH ~ D M HAGNETIC MULTISHOT SURVEY RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER SUB SEA DRIFT DIREC DEG. TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M 7779 25 30 .7399,97 7~25,97 N44,00W 1182,97 N 1.378,25 W 181&.31N 49 21 36 W 7873 25 0 "7484'e99 7410,99 N42,00W 1212,29 N 1405.59 W 1856,16 N 49 13 22 W ?968 24 30 7571,27 7497,27 N4'O,OOW 1242.3i N 1431,68 W 1895,53 N 49 3 3 W 8063 24 0 7657,88' 7583.88 N40,OOW 1272,20 N 1456,76 W 1934,08 N 48 52 9 W 8158 24 0 .'7744,67 7670,67 N40,OOW 1301,80 N 1481.60 W 1972,26 N 48 41 45 W 825~ 24 0 7891~46 7757,46 N40.OOW 1331,40 N 1506.44 W 2010.47 N ~8 31 46 W 83~8 23 0 7918,58 7.844,58 N38.00W 1360~i3 N'1530,'28 W 2047.83 N 48 21 14 W 8443 22 30 8006~19 7932~19 N36.00W 1390 .7 N 1552.38 W 2083,86 N 48 9 19 W 8538 22 0 809~.11 8020,11 N35.00W !419 ~$ N 1573.27 W 2118,97 N 47 56 31W 8633 22 30 8182,04 8108,04 N35.00W 1448 ~2J~L~ 1593.91W 2154,05 N 47 43 40 W 8728 22 30 8269,81 8195,81 N31,OOW 1479,'~i~I~~2189,22 N 47 29 9 W 8823 23 0 8'57,42 8283.42 N32.00W 1510, ~~ 2224,56 N 47 13 ~1 W 8917 22 45 8444,02 8~70.02 N29.00W 1542' { 2259,97 N 46 57 31W 9012 22 0 8531,87 8457,87 N30.00W 1573,6~16~i~g~~2294,10 N 46 41 16 W 9107 22 0 86~9.95 8545,95 N28.00W 1604,81 N 1686,50 W 2328,03 N ~6 25 18 W 9201 22 0 8707.11 8633,1! N32,OOW 1635.30 N 1704,10 W 2361.82 N 46 10 49 W 9295 21 ~5 ~79~,~4 8720,34 N29,.OOW 1665,47 N 1721.88 W 2395.55 N 45 57 14 W 9389 21 15 8881.80' 8807.80 N27,00W 1695,89 N 173'8.05 W 2428.35 N 45 42 12 W 9484 20 30 8970~56 8896.56 N27.00W 1726.05 N ' 1753.42 W 2460,43 N 45 27 2 W 9579 20 0 90~.9',69 8985,69 N26,OOW ~755.48 N 1768.09 W 2491,55 N 45 12 18 W 9674 20 0 914'8,96 9074~96 NZ7,00W 1784.55 N 1782,59 W 2522.95 N 44 58 6 W 9769 19 0 92~8.51 9164.51 :N26,00W 1812,93 N 1796.74 W 2552,~5 N 44 44 34 W 9864 18 30 9328,47 9254,47 '!~N25,00W 1840.49 N 1809.88 W 2581,30 N ~ ~1 10 W 99'59 17 30 9418,82 9344.'82 N24.00W 1867~21N I822,05 W 2608.90 N 44 17 55 W 9980 17 0 9438,87 9~64.87 N24,00W 1872.90 N 1824.59 W 2614.74 N 44 19 5 W 10054 17 0 9509,64 9435,64 N24,00W 1892.66 N 183~.~9 W 2635.05 N 44 5 19 W 10055 17 0 9510.60 9436.60 N24.00W 1892,93 N 183~51W 2635,32 N 44 5 11W BOTTOH HOLE CLOSURE 26~5,32 FEET AT N 44 5 11 W DEC Obt 1978 DOG LEG SEVERITY DEG/iOOFT 0,677 0,654 0,639 0.526 0.000 0,000 1.101 0.610 0.547 0.526 lc611 0,550 0.546 0,803 0,789 0,513 0,601 0e789 0.541 0,360 1,059 0.537 1.057 0.000 0.000 SECTION DISTANCE 1808.6~ 1848*7 1888o42 1965,88 2004,42 2078,61 2114e18 2149,70 2185,37 2221e22 2256,73 2291.73 2326,09 2360e24 2394e28 2491,08 2522,05 2552,28 2581,22 2608,88 2614,73 26~5~05 2635,32 ~., AREO MAGNETIC NULTISHOT SURVEY ,)NTERPOLATEp TRUE VERTICAL DEPTHS, COORDINATES AND CLOSURES FOR fiIVEN DEPTHS · CODE NAHE TRUE MEASURED VERTICAL DEPTH DEPTH TOTAL COORDINATES DEC 06, ~978 C L O S U R E SUB DISTANCE ANGLE ,SEA D M TOP SAD BASE SAD TD 8819.~3 9377.86 9~0.60 1674.22 N 1855,27 N 1892.93 N 1816,68 W 2596.61 N 44 Z3 52 W 9303,86 2635,~2 N ~4 5 11 W 943~.60 ARCO 13,.i MAGt'qETIC MULTISHOT SURVEY MEASURED DEPTH .AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DF-P.TH, TRUE MEASURED VERTICAL SUB MD-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION 2774 2874, 2975 3076 3178 3282 3386 '3491 3596 3701 3806 3911 4016 4122 4227 4333 4439 4545 4651 4757 4864 4970 5077 5185 5293 5401 5510 5620 5?30 5840 5951 6063 6174 6286 6398 -~' 3374, . ~. 3474. ' 3574. 3674, 3774, -:_"-~- 3874. .'~ 3974, 4074, . 4174, 4274, 4374, 4474, 4574, 4674, 4774, 4874, 4974, 5074, 5174. 5274. 5374. 5474. 55?4. 56?4. 5774. 5874. 5974, 6074. 6174. 2774, 2700 2874. 2800 2974. 2900 3074,'~" 3000 3174e?; 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 '5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 6000 6100 0 0 0 1 3 7 11 16 21 27 31 37 42 47 53 59 64 71 76 83 90 96 103 111 118 127 136 145 155 166 177 188 2O0 212 224 TOTAL COORDINATES 24.45 24.31 19.11 11,24 0.88 N 16,01 N 34.11 N 53.44 N 72,69 N 92.27 N 112.59 N 132,89 N 153.26 N 193.90 N 214.4 5 N C©~T~O~4.7 ~ N 7 5 7 7 6 7 8 7 9 9 t0 11 11 12 12 255.98 N 277.10 N 298.87 N 321.31 N 344.04 N 367.64 N 392,70 N 418.70 N 445,35 N 473,78 N 503.20 N 533.39 N 564.29 N 596,06 N 628.26 N 660.73 N 694.64 N 730,39 N 1,14 E 2.01 W 8,44 W 20,16 W 38,44 W 60.87 W 84.75 W 109,51 W 135,09 W !60.79 W 186.18 W 211e89 W 237.30 W 263.53 W 290.42 W 318,13 W 346.01 W 373.93 W 402e46 W 431.33 W 460,12 W 489,22 W 519,42 W 550,21 W 581.20 W 612,85 W 645.68 W 679,52 W 714,26 W 749.80 W 786.34 W 823.39 W 860,41W 897,58 W 933,72 W DEC 06, 1978 ARCO 13-1 MAGNETI.C MULTISHOT SURVEY , MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. MEASURED VERTICAL DEPTH CORRECTION TRUE VERTICAL SUB MD~TVD DEPTH SEA DIFFERENCE 6511 6623 6736 6849 6962 6674, 7076 7189 7302 7415 7527 7639 '7750 7861 '7971 8081 8190 8299 8408 8516 8624 -~ 6774e 6874. 6974. · 7074, 7174. 7274. 7374. 7574, '7674. 7774e 7874, 7974, 8074, 6274. 6200 6374, 6300 6474. 6400 -6574.' 6500 6600 6700 6800 6900 7000 7100 7200 7300 7400 7500 7600 7700 7800 7900 8000 8100 8732 8841 8949 9057 9165 9273 9381 9488 9594 9701 9806 9912 10017 8274.~ 8200 8374. 8300 8474. 8400 8574. 8500 8674, 8500 8774. 8700 8874, 8800 8974, 8900 9074. 9000 9174. 9100 9274e 9200 9374. 9300 9474. 9400 237 249 261 275 288 302 315 328 341 353 365 376 387 397 407 416 425 442 450 458 467 475 483 491 499 507 514 520 527 532 538 543 TOTAL COORDINATES 13 766.77 N 12 802.69 N 12 838,48 N 14 874.97 N 13 912.63 N 14 950.90 N !3 989.27 N 13 1027.23 N 13 1064.75 N t 12 !101,54 N 12 1138,08 N 11 1173.91 N 1208.48 N 1379.34 N 1412.70 N 1446.11 N 1480.72 N 1516.71 N 1552.96 N 1588.35 N 1623.77 N 1658.36 N 169~.18 N 1727.19 N 1760e08 N 1792.62 N 1823.72 N 1854.13 N 1882e71N 969.75 W 1006J07 W 1044.29 W 1082.81 W' 1120.19 W 1158.03 W 1195.23 W 12~1.89 W 1267.50 W 1302.57 W 1336.77 W 1369.60 W 1402,15 W 14~2.48 W 1461.37 W 1489.97 W 1518.Z3 W 1544.41 W 1568.52 W 1591.93 ~ 1614.49 W 1636.59 W 1657.44 W 1~77.55 W 1697.11 W 1717.88 W 1736.67W 1754.00 W 1770.3~ W 1786.67 W 1801.95 W 1816.17 W 18Z8.96 W DEC 06, 1978 ARCO MAGNETIC MULTISHOT SURVEY NTERPOLATED VALb.E$ FOR EVEN 1000 FEET OF MEASURED DEPTH, TRUE MEASURED VERTICAL SUB DEPTH DEPTH SEA TOTAL COORDINATES 3000 4000 5000 6000 7000 8000 9000 10000 2999, 29~5, 17,~4 S 10,80 W 3958, 3884, 150,16 N 233,41 W 4901, 4827, 950,65 'N 497,68 W 5817, 5749e 610,15 N 802,56 W 6707, 6639e 925,41N 11~2J7~ W 7600, 7526, 1252,44 N 1440,19 W 8520, 8446, 1569'~78 N ~667,00 W 94~8, 9384, 1878,24 N 1826,97 W DEC 06~ 1978 ~- .,- ~IELD ~.COM PANY_ 1' ~C-AL; E--'i~ .-- i 000~-:- ,:uRvATURE ....... i ! :___'MAGNF._TIC.__.MUI~TISHOT_: SURVF.¥_ : . [ t:..L.-~ DE PT HS '-. SHOWN ................. ~ COMPLETION REPORT ) ATLANTIC RICHFIELD COMPANY ~.i MAGNE,T?IE,.MULTISHOT SURVEY : RADIUS OF CURVATURE gETHOD OF COMPUTATIONS COMPUTED FOR SDC BY F,M, LINDSEY AND ASSOCIATES 11-50-MMS-079 DEC 06, 1978 .~' WELL DS 13-1 DECLINATION 31 DEG. EAST ':~ r"rl K,B, ELEV, 74 FEET RECORD Of SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER -.i'; TRUE HEAS,-DRJFT VERTICAL' SUB DRIFT DEPTH ANGLE ~: DEPTH SEA DIREC D M DEG. 2750_-! 0 2749,91 2675,91 S 3,00E 2844 -2 30..284~86 2769,86 N5-8,00~ 2936 5 0 .'2935~65 2861.65 N48,00W 3029 8. 0 ":~028.05 2954.05 N58.00W 3~23 ~2 30 ~3!20~52 3046.52 N56,00W ~216 15 0 32~0~8~ 3136.85 N57,'OOW 330~ 16.30' .3299,39 ~225,39 N53.00W 3402 17 !5 3389,34 3315,34 N52.00W 3495 17 ~5 3478,04 3404.04 N52,00W 3588 17 45 3566,61 ~$92,61 3680 18 0 3~54,17 3580.,17 3773 18 0 37~2,62 3668,62 3866 18 15 3831.01 3757,01 N52,00W 3958 !8 0 3918,44 3844.44 NSleOOW 4052 18 15 4007,78 3933,78 N52.00W 4145 18 ~0 4096,03 4022'03 N53,00W 4239 19 0 4185'05 41~1,05 NS~.OOW TOTAL COORD INATE5 CLOSURES DISTANCE ANGLE D M 2:3,97 $' 1,26 E 24,00 S 3 0 32 E 25-.5 S 0,75 W 25,16 .5 1 42:37 W 21 i3 S 5.~5 W 22,24 S 14 27 0 W 15 , 10 $. : 13,94 W 20,63 S 42 30 58 W 6. 27.97 W 28.62 S 77 41 20 W ~ ~,.. ~ 69,90 N 73 1 6 W 37. ~o,~u.~ 95.93 N 67 ~? 48 ~ 71, :30 N 88.29 N 106 J 18 N 124,19 N 142,01 N 160.21 N 178.06 N 196.24 N 4332 19 0 4272.98 4198.98 N54.00W 214.25 N 4425 19 0 4360.91 4286.91 N54.00W 232.05 N 4518 19 30 4448.71 4~74.71 N52.00W 250.50 N 4610 ~9 30 4535.43 4461.43 N54.00W 268.98 N 4702 20 0 4622,02 4548.02 N53.00W 287.48 N 4795 20 0 4709.41 4635.41 N52.00W 306.84 N 4889 20 0 4797.75 472~.75 N52.00W 326.63 N 498~ 21 0 4885.79 4811.79 N52.00W 346.90 N 133.17 W 155.73 W 178.22 W 200.86 W 223.26 W 246.14 W 269.40 W 293,5:3 W ~17.87 W 342.37 W 366.85 W 391.38 W 416.37 W 441.60 W 466.94 W 492,88 W 151.06 N 61 50 6 W 179.02 N 60 26 48 W 207.45 N 59 12 44 W 236.16 N 58 16 13 W 264.60 N 57 32 23 W 29:3,69 N 56 56 22 W ~22,9:3 N 56 32 12 W :35:3,09 N 56 14 3 W 383.34 N 56 1 6 W 413.60 N 55 52 14 W ~44.22 N 55 40 21W 474.90 N 55 29 59 W 505.97 N 55 22 37 W 537.74 N 55 12 25 W 569.84 N 55 1:34 W 602.72 N 54 51:39 W DOG LEG SEVERITY DEG/iOOFT 0.000 1.616 2.719 3.233 4.788 2.689 1.668 0.803 0,538 0.656 0.342 0,332 0,289 0,291 0.286 0.290 0.532 0.350 0.000 0.589 0.726 0.558 0,368 0.000 1,064 SECTIO, DISTANCE -18,09 -17.54 -li.60 -1,22~ 61.17 ':.' 88.16 115.86 143.87 171.77 200.27 2'28e9~ 257,:3~ 286,33 315,33 345.18 :375.05 40~.88 g65,51 g96,18 527,6g 559.49 592.09 ARCO MAGNETIC HULTISHOT SURVEY RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER TRUE DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES MEAS, DEPTH ANGLE DEPTH SEA DIREc D M DEG. 5077 21 0 4973~ 55 5~70 22 0 5060,08 ;;/~986.08 NSOeOOW 389.09 N 545.91 W 5356 22~30 5232~38 5~58.38 NSO.OOW ~3~1~ N 599.57 W 5449 23 30 59~7.99 9243.99 N~9.00W 457.7~ N 627.20 W 5542 2~ 0 5403,11 5329.1~ N.49.00W 482.29 N 655.47 W 5635 2~ 30 - 5487~90 54~3.90 N49.00W 684.29 W 5728 25 0 5572.36 5498.36 N49.00W 5822 25 30 '5657.38 5583.38 N49.00W 5915 2~ 0 .'57~1~14 5667.14 N49.00W ~009 ~ 0 9819,63 5791.63 N~9.00W ~102 2~ ~5 5909,13 5835.13 N49.00W 6~95 26 30 5992,45 ~9~8.45 N48.00W 6288 27 0 6075'49 600~.49 N~7, OOW ~381 27 0 6158~36 608~.36 N~4,00W 724.85 N 928.95 W 6~74 27 0 62~.,22 &1~7.22 N~5.00W 754.96 N 957.95 W 6566 27 0 6323.19 62~9.19 N45.00W 784.49 N 987.48 W 6658 27 30 -~404,98 6330.98 NAT.OOW 813.76 N ~017.78 W ~751 28 0 '6487.29 ' 641~.29 N47.00W 8~3.29 N 10~9m45 W 6845 28 0 6570.28 6496.28 N4~.OOW 873.6& N 1081.46 W 6938 28 0 6652.~0 &578,40 N44.00W 904.54 N 1112.33 W 7032 28 ~5 6735.30 6661.30 N45.00W 936.14 N 11~3.39 W 7125 28 15 ~817~22 6743.22 N44.00W 967.5~ N 1174.24 W 7219 28 0 6900.12 &826el2 N~4.00W 999.~1 N 120'5e02 7311 27 30 6981~54 6907.5~ NA4eOOW 1030.22 N 1234.78 W 7405 27 0 706~ell 6991ell N43.00W 1061.4~ N 1264.~1 W 7498 27 0 71~7e97 7073.97- N44.00W 1092.07 N 1293~47 W 7593 26 30 7232,80 7158.80 N$3.00W 1123.09 N 1322,90 W 7687 26 0 7317,11 7243.11 N42.00W 1153.74 N 1350.99 W C LO 5 U R E 5 DISTANCE ANGLE D M 5 636.36 N 54 42 34 W 670.38 N 54 31 16 W 705.49 N 54 17 44 W 740.23 N 54 5 37 W 776.46 N 53 52 44 W 813,78 N 53 39 16 W 851.86 N 53 26 46 W 5o7 5 N 532.{~9 N 713.68 W 890,68 N 53 15 7 W 559~0 N 743,-9~ W 930.67 N 53 4 8 W 589~0~, 774.43 W 970.98 N 52 53 59 W 666,~~ ~'~"~8 1094.17 N 52 26 28 W DEC 06, 1978 1177.82 N 52 1 3 W 1219.69 N 51 45 29 W 1261.17 N 51 32 5 W 1303,10 N 51 21 22 W 1346.29 N 51 12 58 W 1390.27 N 51 4 0 W 1433.69 N 50 52 56 W 1477.74 N 50 41 28 W 1521.50 N 50 30 45 W 1565.54 N 50 19 43 W 1608.12 N 50 9 37 W 1650.88 N 49 59 13 W 1692.83 N 49 49 32 W 1735.34 N 49 40 12 W 1776.60 N 49 30 10 W DOG LEG SEVERITY DEG/iOOFT 0.000 1,117 0.000 0.543 1.089 0.538 0.538 0.538 0.532 0.538 0,000 0,269 0,344 0,582 1,464 0.000 0.714 0.538 0,499 1,010 0.357 0.509 0.266 0.543 0.575 0,488 0,567 0.570 SECTION DISTANCE 659.2 728,97 802.46 840.52 879.31 919.26 959.51 1000.57 1041.37 1082.56 1208,77 1292.63 1335'87="~ 1379,96 1423.62 1467,93 1511,94 1556.25 1599.09 1642,13 1684.~5 1727.10 1768.66 ARCO l -i MAGNETIC M'ULTISHOT SURVEY DEC 06~ 1978 TRUE MEAS~ DRIFT VERTICAL DEPTH ANGLE DEPTH D M · RECORD Of SURVEY ALL CALCULATIONS PERFORHED BY I B H ELECTRONIC COMPUTER SUB DRIFT SEA DiREC DEG., TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M 9107 22 0 8619,95 8545.95 N28,00W 1604.81N 1686.50 W 9295 21 45 8794,34 8720.34 N29,00W 1665.47 N 1721.88 W . 9389 21 15 8881,80 8807.80 N27,00W 1695,89 N 1738.05 W 9484 20 30 8970~56 8896.56 N27,00W 1726.05 N 1753.42 W 9579 20 0 9059,69 8985,69 N26,00W 1755.48 N 1768.09 W 9674 20' 0 9148,96 9074i'96 N27,00W 1784.55 N 1782.59 W 9769 19 0 9238,51 9164.51 ,.N26,00W 1812,93 N 1796.74 W 9864 18 30 9328,47 9254.47 /N25.00W 1840,49 N 1809.88 W 9959 17 30 9418,82 9344.82 N24.00W 1867.21 N 1822,05 W 9980 17 0 9438,87 9364.87 N24,00W 1872,90 N 1824.59 W 10054 17 0 9509,64 9435.64 N24.00W 1892,66 N 1833.39 W 10-055 17 0 9510~60 9436.60 N24.00W 1892,93 N 1833.51 W ':'~ 7779 25 30 739.9,97 7325.97 N44.,OOW 1182,97 N 1378,25 W 1816,31 N 49 21 36 W 'J 7873 25 0 7484~99 7410.99 N42,00W 1212,29 N 1405.59 W 1856,16 N ~9 13 22 W .-_~ 7968 24 ~0 7571~27 7497.27 N40,OOW ~242,91 N 14~1,68 W 1895.53 N 49 ~ ~ W ..~  8063 24 0 7657.88 758~.88 N40,OOW 1272,20 N 1~56.76 W 193~,08 N 48 52 9 W 8158 24 0 '7744,67 7670,67 N~O,OOW 1~01,80 N 1~81,60 W 1972,26 N 48 41 45 W ~.~ - 8253 24 0 7831e46 7757,46 N40,OOW 1331e40 N 1506,44 W 2010,47 N 48 ~1 46 W ~ 8~$8 29 0 7918e58 786~,58 N38.00W 1360~3 N 1530.28 W 20~7,8~ N ~8 21 16 W 8443 22 30 8006,19 79~2,19 N36,00W 1390~7 N 1552,38 W 2083,86 N 48 9 19 W ~ 8538 22 0 8094,11 8020.11 N~5,00W 1419~~ N 15'7~,27 W 2118.97 N ~7 56 ~1 W ~'~ 8623 22 ~0 8182,04 8108,04 N~5.00W 1448~2~ 1593,91 W 2154,05 N 47 4~ 40 W ?~ 2 5 8444 02 8370 02 N29 OOW 1542, 6 2259,57 N ~6 57 ~1 W 9012 22 0 8531,87 8457,87 N30.OOW 1572,~~16~~I)~229~.10 N 46 ~1 16 W :~ ' 2328.03 N 4b 25 ~8 W '~ 920~ 22 0 8707,1~ 8633.tl N32,0OW ~635,30 N 1704,~0 W 236~.82 N ~6 ~0 49 W 2395.55 N 45 57 14 W 2428.35 N 45 42 12 W 2460.43 N 45 27 2 W 2491,55 N 45 12 18 W 2522,~5 N 44 58 6 W 2552,45 N 44 44 34 W 2581.30 N 44 31 10 W 2608.90 N 44 17 55 W 2614.74 N 44 15 5 W 2635.05 N 44 5 19 W 2635.32 N 44 5 11 W BOTTOH HOLE CLOSURE 2635.32 FEET AT N 44 5. 11 W DOG LEG SEVERITY DEG/iOOFT · , 0,677 0,654 0,639 0.526 0,000 0,000 1,101 0,610 0e547 0,526 1.611 0,550 0,546 0,~03 0,7'89 1,59~ 0,513 0.601 0,789 0,541 0.360 1,059 0,537 1,057 2.381 0.000 0,000 SECTION DISTANCE 1808.62.-~. 1848.7 1888,42 19'27.34 1965,88 2004.42 2042.15 2078,61 2114.18 2149.70 2185.~7 2221,22 2256,73 2291.73 2326,09 2360,2~ 2394.28 2459,7~ 2491,08 2522.05 2552,28 2581.22 2~08,88 2614e73 26~5.05 2635.32 ARCO 13-1 MAGNETIC HULTISHOT SURVEY ,INTERPOLATE.I) TRUE VERTICAL DEPTHS., COORDINATES AND CLOSURES FOR .GIVEN DEPTHS I ~ CODE· 'NAME ~ TOP ,SAD 9322 :i BASE SAD ' 9916 i~: TD 100~ TRUE MEASURED VERTICAL TOTAL COORDINATES C L 0 S U R E DEPTH DEPTH D/STANCE ANGLE D M S 9377.86 1855.27 N 1816.68 W 9~10.60 1892,93 N 1833,§1W DEC 06~ 1978 SUB SEA 2405,08 N 45 53 0 W 87~5,43 2596,61 N 44 23 52 W 9303.86 2635.32 N 44 5 11W 9436,60 & ARCO 13-i MAGNETIC MULTISHOT SURVEY MEASURED DEPTH .AND OTHER DATA FOR EVERY EVEN !00 .FEET OF SUB SEA DEP.TH. MEASURED VERT ! CAL DEPTH CORRECT[ON TRUE VERTICAL SUB MD-TVD DEPTH SEA DIFFERENCE TOTAL COORDINATES 2774 2874 2975 :3076 :3178 :3282 3:386 :3491 3596 :3701 3B06 :3911 4016 4227 4439 454B 4~ 48~ 49~0 ~0~ ~185 529~ 5510 ~620 5730 5840 ~0~ 628~ 6~98 2774, 2700 2874, 2800 2974, 2900 3074,-!-':: 3000 3174,/: 3100 3274~'/-' 3200 3374, 3474, .... 3574. 3674~ 3774, · 3874, 3974, "-":: 4074. 4174. 4274, 4374. 4474. 4574. 4674, 4774. 4874. 4974, 5074. 5174. 5274. 5374. 5474. 5574. 5674. 5774. 5874. 5974. 6074, 6174~ 3:3O0 3400 3500 36'00 3700 3800 3900 4000 4100 4200 4:300 4400 4500 4600 47O0 4800 4900 '5000 5100 5200 5:300 5400 5500 5600 5700 5800 5900 6000 6100 0 0 0 1 3 7 11 16 21 27 31 37 42 47 53 59 64 71 76 83 90 96 103 Ill 118 127 136 145 155 166 177 188 ZOO 224 24,45 S 24,3t 5 19,11 $ 11,24 5 0.88 N 16,01 N :34,11 N 5:3,44 N 72.69 N 92,27 N I 4 112.59 N 6 132,89 N 153.26 N D)~JIIL&Jt~ 1 g :3,90 N 214,45 N ;~ ~'~, ~' ~-~ 7 5 7 7 6 7 8 7 9 9 9 10 11 11 11 12 12 12 255.98 N 277,10 N 298,87 N 321.31 N 344.04 N 367,64 N :392.70 N 418e70 N 445,35 N 473,78 N 503.20 N 533.39 N 564,29 N 596,06 N 628,26 N 660,7:3 N 694,64 N 730,39 N 1,14 E 2.01 W 8,44 W 20,16 W 38.44 W 60,87 W 84,75 W 109,51 W 1:35,09 W 160,79 W 186,18 W 211.89 W 2:37.30 W 263,53 W 290.42 W 318,13 W :346.01 W 373.9~ W 402,46 W 431.33 W 460,12 W 489.22 W 519e42 W 550,21 W 581,20 W 612,85 W 645.68 W 679.52 W 714,26 W 749.80 W 786.34 W 823,39 W 860.41 W 897,58 W 933 · 72 W DEC 06, 1978 ARCO 13-1 MAGNETIC MULTISHOT SURVEY MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEP.TH. TRUE MEASURED VERTICAL SUB MD-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION 6511 6736 " 6849 6962 ?0?6 7189 7302 6274, 6200 6374, 6300 12 6474, 6400 12 6574, 6500 14 6674, 6600 13 6774, 6700 14 6874e 6800 6974, 6900 . 7074, -7000 7174, 7100 12 7274, 7200 7374, 7300 7474, 7400 ' 7'574. 7500 7674, 7600 7415 7527 7639 7750 7861 7971 8081 8190 ' 7774. 8299 8408 8516 8624 8732 8841 89/+9 9057 9165 9273 9381 9488 9594 9701 9806 9912 10017 7700 787~, 7800 7974. 7900 8074, 8000 8174. 8100 8274,~. 8200 8374, 8300 8474, 8400 8574, 8500 8674, 8600 8774. 8700 8874, 8800 89746 8900 9074. 9000 9174. 9100 9274e 9200 9374, 9300 9474, 9400 237 249 261 275 288 315 328 341 353 365 376 387 397 407 416 425 434 442 450 458 467 475 483 491 499 5O7 514 52O 527 532 538 543 TOTAL COORDINATES 766.77 N 802.69 N 838.48 N 874,97 N 912.63 N 950.90 N 989,27 N 1:027,23 N 1064.75 N 1101.54 N I12 1138.08 N 11 1173.91 N 1208.48 N  ~CII~:~YIIF~3.26 N 1379,34 N 1412,70 N 1446,11N 1480,72 N 1516.71 N 1552.96 N 1588.35 N 1623.77 N 1658.36 N 1693.18 N 1727,19 N 1760608 N 1792,62 N 1823.72 N 1854,13 N 1882.71 N 969.75 W 1006.07 W 1044.29 W 1082.81 W 1120,19 W 1158.03 W 1195.23 W 1231,89 W 1267.50 W 1302,57 W 1336.77 W 1369.60 W !402,15 W 1432.48 W 1461.37 W 1489.97 W 1518.23 W 15~,41 W 1568.52 W 1591,93 W 1614.49 W 1636.59 W 1657.44 W 1677,55 W 1697,11 W 1717,88 W 1736,67 W 175~,00 W 1770,34 W 1786.67 W 1801.95 W 1816,17 W 1828.96 W DEC 06e 1978 ARCO 13-1 NTERPOLATED VAL~JE$ MEASURED DEPTH 3O0O 4000 5000 6000 ?000 8000 9000 10000 FOR EVEN TRUE VERTICAL DEPTH 2999, 3958. 4901, 5817, 6707. 7600, 8520. 9458, 1000 SUB ,SEA 2925. 4827, 5743, 6633. 7526. 8446. 9384. MAGNETIC HULTISHOT SURVEY FEET OF MEASURED DEPTH, TOTAL COORDINATES 17.34 S 150.16 N 350.65 N 610,15 N 925,41 N 1252,44 N 1569.78 N 187'8,2~ N 10.80 W 233,41 W 497.68 W 802,56 W 1132,73 W 1440,19 W ~667,00 W 1826,97 W DEC 06, 1978 · ALL---. '. A RE--TV D ...................... · . . , LELD--.CO. MEA;AY ...... ;.~_ RA D I US,-:OF.:C URNAT UR F2 T · ALI.~' '-' DEPT'HS-'SHOW N -'- , , ' I ! MC)=-IO;2 , [ - , Jammlry 8, 1979 Atlm~-ic ~z~fie14 ~ P.O. BC= 360 ;~dx=m~, ~ 99510 or Bsom~F~m ~ and ~ (Fozm 10-407). If ~ ~ ~ bee~ so om~leU~, ab~k.~ c~ suspe=led, please su~t ~ ~ a~ ~s ti~. Atlanti~:RichfieldCompany. North American Producing Division North Alasl~ '3istrict Post Office.{. x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 2, 1979 Reference: -Enclosed are the following Singleshot Surveys: ~ DS 7-5 12/20/78 V,DS 726 12/20/78 ,/DS 7-7 12/20/78  11/27/78 Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL #001 DISTRIBUTION North Geology Drilling Eng. Manager. ~, ' R&D Geo lo gy St at e-~...o f' 'AlaSka ' D&M E.icxoI1 .' Sohio Mobil Hat a thon Phillips Chevron Getty October 24, 1978 Atlantic Richfield flmpany P. O. Box 360 An~g~, Alaska 99510 Per telephc~e cc~~~ of October 24 between Jchn ~ , r . ' ' DO,C, and you, this letter ccnfiuns our wai~ of the re--ts ~ ~ay ~nit'#DS 13-I. These requir~nts instem~ will ~e im~se~ on the Pru6hoe Bay Unit ODS 13-5 ~hi~ you plan to core, thus providing the State with a set of samples and a mud log frcm one well drilled fr~u Drill Site #13. Acting Director Form 10-403 REV. 1-10-73 SuDmlt "intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (~o r;o~ ~se ~hl~, for:~ ;~.' ~-~ ~?c:a'.~ ~,O drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. OW~LLLI~iWELLGAS lI-] OTHER 2. NAME OF OPERATOR Atlantic Richfield Co. 5. APl NUMERICAL CODE 50-029-20324 6. LEASE DESIGNATION ANO SERIAL NO. ADL 2831 5 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit ADDRESS OF OPERATOR 9. WELL NO. P.O. Box 360, Anchorage, 'AK 99510 DS 13-2 4. LOCATION OF WELL At surface 2172'N & 32'W of SE cr Sec. 14, TION, R14E, UM 13. ELEVATIONS (Show wl~ether DF, RT, GR, etc.) 64' RKB, 38' Pad Elevation (grave]) 14. Check Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Unit-Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 13, T1ON, R14E, UM 12. PERMIT NO. 78-61 )orr, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) Loqgi ng SUBSEQUENT REPORT OF.' WATER SHUT-OFF ~ REPAI RING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTEs Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent detelll, anti give pertinent dates, including estimated date of /~' ^tlantic Richfield Company plans to mud log and electric log DS 13-2 from the shoe of the~ / 20" conductor pipe to ID, with di. tch samples to be furnished to the State. ~ (We now expect DS 13-2 to satisfy the state's requirement of mud logging and electric logging of one well per drill site. At present, we do not expect to mud log or do any/ extra (above normal) electric logging on future DS 13 wells. 16. I hereby certify that the foregoing is true and correct TITLE District Drillinq Enqinee. rDATE (This space for State office use) APPROVED CONDITIONS TITLE See Instructions On Reverse Side Atlantic,VticniieidCornp a:';y ?,forth Alaska D'[strict Post Office ][ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 26, 1978 Reference: Enclosed are the following Directional Surveys: DS 4-12 Gyroscopic Survey 12/6/78 DS 7-6 Gyroscopic Survey 12/6/78 DS 7-1 ~ Gyroscopic Survey 12/6/78 13-_1_~ Magnetic Multishot 12/6/78 DS 14-3 v Gyroscopic Survey 12/6/78 DISTRIBUT ION North Geology Exxon Drilling Sohio Eng. _Manager Mobil R & D Marathon GeoJ ogy Phil].~.ps State of Alaska Chevron D & M Getty /ttlanticRichfieldCompany North American Producing Division North Alas ~istrict Post Offic~ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 13, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Subject' DS 13-1 Dear Sir' Enclosed please find a Monthly Report of Drilling Operations for the above-mentioned well. Very truly yours, P. A. VanDusen District Drilling Engineer PAV'jh Enclosure Form No. 10-404 ( SUBMIT IN DUPLICATE (~' REV. 3-1-70 STAT E O F A LAS KA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20323 6. LEASE DESIGNATION AND SERIAL NO. ADL 28315 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. O. Box 360, Anchor.age, Alaska 4. LOCATION OF WELL 99510 2290'N & 56'W of SE cr Sec. 14, TION, R14E, UM 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 13-1 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe Oil 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 14, TION, R14E, UM 12. PERMIT NO. 78-60 Poo' 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. Report of Operations for the Month of November, 1978 Spud @ 1330 hrs 11/8/78. Drld 17-1/2" hole to 2924'. Ran 13-3/8" w/shoe @ 2738'. Cmtd w/6800 sx Arcticset II w/0.6% D13R, 15.2 slurry. Drld out & tstd form to 12.5 ppg equiv. Drld 12-1/4" hole to 10,055'. Ran DIL/SP, BHCS, FDC/CNL/Cal/GR logs. Ran 9-5/8" csg w/shoe @ 10,033'. Cmtd w/1250 sx Class G cmt, 15.8 ppg slurry. Pumped 300 sx Arcticset I cmt thru lo~r FO. Ran CBL log. Did Arctic Pack job thru upper FO. Displ mud w/wtr & wtr w/CaC12. Ran junk bskt. Ran 5-1/2" compl assy w/shear sub @ 9126', pkr @ 8998, Bal-O valve @ 2195'. As of November 30, 1978 tstd control lines. '14. I hereby ~t t~~t SIGNED, TITLE District Dr_l__n.ilia Engineer;ATE .. . 12/13/78 [qOTE-R~port on this form is required for each calendar month, regardless of th~ status of operations, and must be iliad in dupficata ~i~h tha oil and gas conservation oommittea by tha ~5th of the succa~:~ing month,unless otherwisa diraeted. DE~. OF ~TURAL RESO~CES DIV. OF OIL & ~S CONSERVATION Hoyle H. Hamilton Director Lonnie C. Smith /~ ~ief Petroleum Engineer Ben LeNorman Petroleum Inspector December 4, 1978 BOPE Test Arco DS 13-1 Wednesday, November 8 - I departed my home at 5:30 AM for a 6:00 AM showup and 7:00 AM departure via Wien Flt. #23 for Deadhorse arriving at 9:30 AM. I proceeded to Arco's workover 6-4 where BOPE test were com- pleted at 12:20 PM, the subject of a separate report. Thursday, November 9 - Recalibration of 24" prover and meter proving, the subject of'Separate reports, were completed. Friday, November 10 - Low pilots, SSV's and SSSV's were retested on wells DS 4-2', 4'4, and 4-5, the subject of a separate report. Saturd_ay,_ November I1 - Standing by on DS 13-1 for upcoming BOPE test. . _. Sunday, ,Now.emb~,~' 1~ - Arco drilling foreman was Kirk White and Tool- pusher for Parker Rig #141 was Dean Trout. Pressuring was accomplished with two stage Koomey pump utilizing diesel as a medium, Shoe on 13 3/8~ casing was set at 2738'. Test Joint with weep hole was nippled up into kelly system to facilitate testing of-lower pipe rams which were below the spool. Kelly cock, check valve in the kill line, both outside wing valves on the lower spool, upper pipe rams, and three valves in the choke manifold tested to 5000 PSIG. Lower kelly valve, wing valve in the kill line and three additional valves in the choke manifold tested to 5000 PSIG. The two additional valves in the choke manifold then tested to 5000 PSIG, The manual adjustable choke was free moving and the Swaco superchoke activated fully opened and fully closed. Annular preventer then tested to 3000 PSIG and lower pipe rams and two inside wing valves on the lower spool tested to 5000 PSIG. Accumulator pressure was 3000 PSIG. We cut the accumulator pump off and closed the annular preventer, one set of pipe rams, and opened the HCR valve simultaneously. Accumulator pressure dropped to 1400 PSIG and remained, steady, The accumulator pump was then turned on and the cumulator pressure returned to 3000 PSIG in six minutes, forty seconds. N2 backup bottles tested at 1900, 1900, 1850, and 1900 PSIG. While backing out of the test plug to test the blinds I toured._.the location which was well organized, well sign was in place, rig in good repair, and reserve pit well built. Both dart and ball type floor valves were in place before the drawworks. Blind rams. and HCR valve in the choke line tested to 5000 PSIG. Finally, the inside wing valve on the choke line tested to 5000 PSIG and tests were concluded at 10:45 AM. Arco's DS 13-1, BOPE Test December 4, 1978 Two small leaks, one in a hydraulic line going to the lover pipe rams and the other in a Grayloc coupling, were repaired during the tests. The diverter system had been inspected on November 8th. A field inspection report was prepared with a copy given to Kirk White, a copy miled to Bob Hines, and the original attached to this report. Durim~ the afternoon I witnessed testing of annulus pressures, low pilots, SSV~s and SSSV's on ten wells on Drill Site tl were witnessed during the morning, the subjects of a separate report. departed Prudhoe Bay via Arco charter at I:00 PM arriving in Anchorage at 2:30 PM and at my home at 3:00 PM. In summary, I inspected the diverter system and witnessed successful BOPE Test on Arco's DS 13-1. LCS/BL:emt Drlg. Permit No._ O~erator ..... ~~ Satisfactory Type Inspection Yes No Item (~)~ff_ocation,General (~-() (~() (~() () () () () () () () () () () () ~ka Oil and Gas Conservation Comm~ee Field Inspection Report Wel 1/P~ Represented bY_~F~ ~i>-~ Name & Numb~ Satisfactory Ty'pe Insp~ Yes No Item (~I~OPE i 1. Well Sign 2. General HousekeepinQ ~. Reserve Pit-( )open( )filled 4. Rig ( ) Safety Valve Tests 5. Surface-No. Wells 6. Subsurface-No. Wells ( ) Well Test Data 7. Well Nos. , , , 8. Hrs. obser , , , 9. BS&W , , , 10. Gr. Bbls. ( ) Final Abandonment (~-' ( ) (~-- ( ) (~,.~ ( ) (~).-.-- ( ) (~,,- ( ) (~t' ( ) (,,)-- ( ) (~-' ( ) ( () (~() .15. ~Casinc 18 19 20 21 22 23 24 25 16. TesL fluic 17 Master Hyd N2 bt 1 s/_~_~, Remote Con Drill in~ s .. Kill Line- Choke F1 ow Choke Mani Chokes-( Test P1 u9- 26. Annul ar Pre 27. Blind Rams; ( ) ( ) 11. P&A Marker (~)7' ( ) 28. Pipe Rams .~ ( ) ( ) lZ. Water well-( )capped( )plugged (~-~' ( ) 29. Kelly & Kel ( ) ( ) 13. Clean-up (~,)~ ( ) 30. Lower Kelly ( ) ( ) 14. Pad leveled (~,)~' ( ) 31. Safety Floo Total inspection observation time_,,q~..~hrs/d~,y~ Total number leaks and/or : Remarks days or when ready Inspected by~ ~o~~ of any ~aters of the ~ is ~ited by ~ 46. ~ 03, ar~c~e 7 a,~ ~ ~t~c,m ~gate~ ~ ~itle 18. ALaska To ai4 ~s in scbec~li,~ fiel4~ ~rk, we.~ appzeeiate ~ ,~ei~ this offic~ within 48 ~ ~ ~he ~ is ~. ?~ %~ald also like to be notified so ~ a re~ti~e of the Divisic~ may be pxeser~ to %~~ test/z~ of b~ p~ter equipment bef°~ surface casing shoe is dri~ed. Bay Unit ~6 13-1 17, 1978 ~c. Smith De~ of Ftah ~ ~s~e, ~abitat ~ w/O e~cl. ~t of zavimxmmtal om~a~atica w/o eaci. Dlvisi~ w/O ~1. DEPARTMENT OF NATI~'RAL RESOI~RCES M/NERAL~ AND ENERGY MANAGEMENT E. 4TH AYENU£ - AN£HORASE 99501 October 17, 1978 Atlantic Richfield Co. North American Producing Division North Alaska District P.O. Box 360 Anchorage, Alaska 99510 Attn: Joseph R. Solove, Landman Re: LO/NS 78-117 (77-42) ADL-28315 Drill Site 13-~ Gent 1 emen: Thank you for your letter Of August 25, 1978. The referenced Lease Operation is approved as requested, subject to the following stipulations. I. The area around and below the fuel storage facilities shall have a dike surrounding it with impermeable membranes beneath or the fuel storage facilities shall be of double wall construction. 2. A completion report shall be submitted within fifteen (15) days after completion of this operation. Sincerely, Ethel H. Nelson Leasing Manager 10-J3LH Form 10-401 REV. 1-1-71 la. TYPE OF WORK STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN SUBMIT IN T! ,fATE (Othcr instructions on reverse side) RECEIVE ,. 1 O g78 DRILL b. TYPE OF WELL OIL GAS NAME OF OPERATOR OTHER DEEPEN r-] ATLANTIC RICHFIELD COMPANY Division o! Oil and Gas Gonm ZONE ~ zo~ 'U 3. ADDRESS OF OPERATOR · 4. LOCATION OF WELL At surface At proposed prod. zone (08800' ss) P.O. BOX 360 ANCHORAGE, ALASKA 99510 2290'N & 56'W of SE cr Sec. 14, TiON, R14E, UM 1320'S & 1320'W of NE cr Sec. 14, TiON, R14E, UM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE' ApproXimately 2.5 miles NW of Deadhorse 14. BOND INFORMA~ON: APINo. 50-029-20323- 6. LEASE DESIGNATION AND SEPAL NO. ADL 28315 7. IF INDIAN, ALLO~FEE OR TRIBE NAME ration 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 13-1 10. FIELD AND POOL, ORWILDCAT Prudhoe Bay Field-Prudhoe OJ 11. SEC., T., R., M., (BOTTOM POOl HOLE OmECTIVE) Sec.. 14, T!ON, R14E, UM 12. TYPE Statewid~ure~a,d/orNo. Federal Insurance Co. #8011-38-40 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also tO nearest ddg, u~t. ff any) , 1320' 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2640' 2I. ELEVATIONS (Show whether DF, RT, CR, etc.) 16. No. OF ACRES IN LEASE 2560 19. PROPOSED DEPTH 9454': +TVD. Amount SlOO: 000 ' . 17. NO, ACRES ASSIGNED TO THIS WELL 160 20. ROTARY OR CABLE TOOLS Rotary 22. APPROX. DATE~WORK WILL'START 64'RKB, 38' Pad Elevation (Gravel) 10/!9./78 23. PROPOSED CASLNG AND CEMENTING PROGRAM · "SIZE OF HOLE ' SIZE OF CASING WEIGH~ PER FOOT' GRADE SETTII~G DEPTH Quantity of cement ' ,,, 32',' .... 20" 94 lb. H-40 109'+MD 167 sx permafrost II.to surface 17½" 13-3/8". 72 lb. MN-80 2700'+MD circ. to surface-,aPprox, 65..00. sx 12¼" . 9-5/R" .A7 lh Ro-q5 q860'+_MD . .9200'+_ CMT column on ist stage ( ........... 1000 .~x~ plus 300'+ e_olumn on. 2n sta~e (anorox. 300 sx~ :~e.(ap.pz Atlantic Richfield Company proposes to directionally drill this well to +_9860'MD, +__9454'TVD · to produce the Sadlerochit zone. Logs will be run across selected intervals. A 20-3/4" 2000 psi annular preventer will be used on the 20" conductor. A 13-5/8"5000 psi RSRRABOP stack will be used. It will be pressure tested each week and operationally tested each tripf A string of 5½" 17# N-80 tubing, packer, and necessary provisions for subsurface safety equip- ment will be run, The packer will be set above the Sadlerochit, A non-freezing tiquid will be left in all uncemented annuli within the permafrost interval. Selected intervals within the Sadlerochit interval will be perforated, and reported on subsequent report. A 5000 psi WP wireline lUbricator, tested to working pressure, will be utilized with all wireline work. Well will be flowed to production facilities during perforating and testing. The downhole IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen direcfionally, give perlinent data on subsurface locations and measured and true verlical depths. Give blowout pre~nter program. (Cont. Reverse si 24. I hereby certify that_the Forgoing is Tm___~nd Correct (This space for State office use) ISAMPLES AND CORE CHIPS REQUIRED ~ v~s [] ~o DIRECTIONAL SURVEY REQUIRED Mi yES [] NO MUD LOG CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: [--] NO A.P.I. NUMERICAL CODE 50-029-20323 PERMIT NO APPOVED BY APPROVAL DATE TITLE ~ *See Instruction On Reverse Side October 17, 1978 DATE October 17 197R At[ahticRichfieldCompany North Ameri( Producing Division North Alaska,~,strict-" Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 13-1, 13-2, 13-3, 13-4 Dear Mr. Hamilton: Enclosed herewith is our Application for Permit to Drill, a $100.00 filing fee, and the required survey plat, for the above-mentioned wells. Very truly yours, ank M. District Drilling Engineer FMB: lr Enclosures SURFACE DIVER'f]. . ., SYSTE>I i'o Sur.? ' ' To Sb~ · !. 20" Brad~nhead 2. 20" 2803 psi drilling spool 3. 20" 2030 psi annular preventer 4 6" b~r,ly valves Well 56' Well 2 Well 7' t '5°?-5'05'' AS- BUILT WELL No. I LAT. 70°13'i2.265'' Y 5 932 354.81 LONG. 145°29 24.106 X 687 151.26 WELL No. 2 LAT. ?0°13'i1.106" Y 5932237.63 LONG. 148°29' 25.$91" X 687 178.80 WELL No. 3 LAT. 70°15' 09,954" Y 5952 121.11 LONG. 148o29' 22.671" X 687 206.49 WELL No. 4 LAT. 70° 13', 08.801 ", Y 5 952 004.57 LONG. 148°29 21.939' X 687 234.61 Well 4 18' COORDINATES ARE ALASKA STATE PLANE ZONE 4. I$ Protrocfed Section bine 23 24 · EXISTING CONDUCTOR CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION, AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT 7- 2.7- ?~ DATE SURVEYOR ARCO No HVL No ATLANTIC RICHFIELD CO. AS- BUILT DRILL SITE No. 13 WELLS 1 THRU 4 LOCATED IN PROTRACTED SECTION I$ E~ 14,T ION,R 14 E,U.M. PREPARED BY HEWlTT V LOUNSBURY /& ASSOC. ~ ~ 6,r. AVE ANCHORAGE , ALASKA [:aTE JULY 1978 SCALE I"= E:O0' CHK D BY P.C. FIELD BK SURFACE DIVER'S., To Su,-. 2 ~ 20" D~ .... _- .... 2. 20" 20~.S psi drill~,.q] 3. 20" 2J30 ps~ an.qui~_r T:'e':enter ~;. 6" b.~tterfly -oW Well 1 56' Well 4 i 23124 Proirocfed Section Line CERTIFICATE OF SURVEYOR t HEREBY CERT~=Y THAT ! bM PROPERLY REGISTERED AND LICENSF~. TO PRACTICE LAND SURVEYING IN ~HE ST,~TE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADF BY ME OR UNDER MY -SUPERVISION, AND ALL DIMENSIONS AN2 OTHER DETA',LS ARE CORRECT 7- Z, 7- 7~ DATE SURVE YCP. " AS- BUILT WELL No. I LAT. 70° I 5' I 2.265" LONG. 149° 29 24..106 WEL'L No. 2 L. T. LO'JO. 148029, 2~5.391 WELL No. 3 - oo LONG. 148° 29' 22.67 ! WELL No. 4 LAT. 'TO° 13', OB.801" LONG. 148°29 21.939" Y 5 932 354.81 X 697 151.26 Y 5 932 >_37 X -~87 178.80 Y 5932 121.11 X 687 ;)06.49 Y 5 932 004.57 X 687 234.6 ! COORDINATES ARE ALASKA STATE PLANE ZONE · EXISTING CONDUCTOR ARCO. No. HVL No ATLANTIC RICHFIELD CO. AS- BUILT DRILL SITE No. 13 WELLS 1 THRU 4 LOCATED Ir,i PROTRACTED SECTION 1:5 B~ 14,T ION,R 14 E,U.M. HEWlTT V LOUNSBURY ~ ASSOC. ~, 6, ir AVE , ANCHORAGE, ALASKA JULY 1978 SCALE I": 200' BY P.O. FIELD BK CIIECK LIST l-OR b,iE~V ~J~L PF/~.',IITS ]._ Is a c~>nservation order needed ................... 2. Is adm~inistrative approval needed ................. 3. Is conductor string provided ........ , ............ Yes No Remarks · Is the pc' :ti t fee attached ..... . ................ ~_~ '. Is well t~ i~: located in a defined pool ............... ,~ i. Is a regi,?.-:.~ :'c~ sul~,ey plat attached ' ~. is well ] ,~tod proof dist~ fr~ pro~rty line ......... 5. Is well. lc. 'at~ proi~r dist~' fr~. other wells .......... / I~ ~[~r~or ~e only a~eckod ~r~y ...... ~... ~ ....... ~ ~.. __ Can ~n~t ~ approv~ ~fore ten-day wait Lease & Well No. /~/~/J - Item. Approve Date -(1) Fee [2) Loc. L4. Is enough cezent used to circulate .on conductor and sUrface .... [5. Nil. 1 cement tie in s~Lrface and i~termediate or production strings . [6. Will cement cover all knewn productive horizons .......... ~l ' , !.7. Will surf., c c~sing protect fresh water zones !8. Nil]. a].l ,".u,ing give adequate safety in coil_apse, tension & burst .. 1.9. Does BOPE have sufficient pressure rating- Test to---o---6-O~O psig . ~ '~~a_ ~~~_~_~(5) PIDPE 20, }fas D?..UiM aj ,preyed Plan of Operation ................ U .!dd J tional Rec~ in,ne, nts: -(6) Plan ~__ Approval Recommended: Geology: Eng J]~eering: ~~'~ ~~ JCy. ~ ~. ~vised 4/14/78 Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to*the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No 'special'effort has been made to chronologically organize this category of information. o. LIS TAPE VERIFICATION LI S~TiNG LVP OlO.H02 VERIFICATION LISTING PAGE ~ REEL HEADER ~ SERVICE NAME :EOIT DATE :86111120 ORIGIN : REEL NAME : ~ ~ CONTINUATION ~ :01 PREVIOUS REEL : COMMENTS :LIBRARY TAPE -~- TAPE HEADER ~ SERVICE NAME :EDIT DATE :86/11/20 ORIGIN :FS1A TAPE NAME : CONTINUATION ~ :01 PREVIOUS TAPE : COMMENTS :LIBRARY TAPE ~.x: FILE HEADER '~'~ FILE NAME :EDIT .001 SERVICE NAME : VERSION ~ : DATE : M&XIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE : ...... INFORMATION RECORDS MNEM CONTENTS UNIT TYPE CATE SIZE CODE CN : ARCO ALASKA, INC. ~000 000 018 065 WN : DS ~ 13-1 000 000 010 065 FN : PRUDHOE BAY 000 000 012 065 RANG: 145 000 000 004 065 TOWN: ION 000 000 004 065 SECT: 14 000 000 002 065 COUN: NORTH SLOPE 000 00'0 012 065 STAT: ALASKA 000 000 006 065 CTRY: USA 000 000 004 065 MNEM CONTENTS UNIT TYPE CATE SIZE CODE PRES: E ~000 000 001 065 -'-"- COMMENTS " .... :~:~.,.~ ..... ~.,..,.~..~..,.., ....... ~.~..~.~.~. ,..,.~ .... .,..,.~,.~..~..~..~ .... ,..,.~ ..... ,..~.,. ~ ~:~.,..,..~.~.,..,.....,..,..,. LVP OlO.H02 VERIFICATION LISTING P~GE Z -:- SCHLUt4~ ,~ R G E R .'~.' ALASKA COMPUTING :CENTER "' .,..,..,..,.., .... .,. ., .,. .,. ~ ~: =;~ ,. .,. .,. .,. .,. .,. .. .. ., .,. .,. .,. ,.., ..... ,..,..,..,..,. .. .,. .,. .,. .,. .,. .,. .,. .,. .,. ., .,. .,. -,. .. .,. .,. .,. .,. ;;-' ;~ ;;.' .,- .... , .... -,- -,--,. -. -,- m -:- -,- m . .... COMPANY l= ARCO ALASKA INC WELL = D.S. 13-1 FIELD : PRUDHOE 5AY COUNTY = NORTH SLOPE ~OROUGH STATE : ALASKA JOB NUMBER AT ACC: 72071 RUN ~FIVE, DATE LOGGED: 14 NOV 85 LDP: T HALSTEAD CASING CASING TYPE FLUID : 13.375" SURFACE TO 2738' = 9.625" SURFACE TO 10033' : PRODUCED FLUIDS LVP OlO.H02 VERIFICATION LISTING PAGE SCHLUMBERGER LOGS INCLUDED WITH THIS MAGNETIC TAPE: .4 COMPENSATED NEUTRON LOG - :CASED HOL~ (CNL 3 PASSES) -t~ . :-- ~ DATA FORMAT RECORD *~ ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 2 1 66 0 4 1 66 I 8 4 73 60 9 4 65 .liN 16 1 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVI.CE SERVICE UNIT API API API API FILE SIZE SPL REPR ID DE PT GR PS1 NPHI PSI NRAT PSi RNRA PSl NCNL PSl FCNL PS1 GR PS2 NPHI PS2 NRAT PS2 RNRA PS2 ORDER :LOG TYPE CLASS MOD NO. PROCESS CODE (OCTAL) FT O0 000 O0 0 0 4 GAPI O0 310 Ot 0 0 4 PUi O0 890 O0 0 0 ~ O0 420 O1 0 0 4 O0 000 O0 0 0 4 CPS O0 330 31 0 0 4 CPS O0 330 30 0 0 4 GAPI O0 310 O1 0 0 4 PU O0 890 O0 0 0 ~ O0 420 O1 0 0 ~ O0 000 O0 0 0 4 I 68 00000000000000 1 68 00000000000000 1 68 00000000000000 1 68 00000000000000 1 68 00000000000000 I 68 00000000000000 1 68 00000000000000 I 68 00000000000000 1 68 00000000000000 I 68 00000000000000 1 68 00000000000000 LVP OiO.H02 VERIfICATiON LISTING PAGE NCNL PSZ FCNL PS2 GR PS3 NPHI PS3 NRAT PS3 RNRA PS3 NCNL PS3 FCNL PS3 CPS O0 330 31 0 CPS O0 .330 3'0 0 GAPI O0 310 01. 0 PU O0 890 O0 0 O0 420 O1 0 O0 000 O0 0 CPS O0 330 31 0 C~S O0 330 30 0 OEPT RNRA NPHI FCNL RNRA 9909.0000 GR 3.4844 NCNL -999.2500 NRAT -999.2500 GR -999.2500 NCNL OEPT RNRA NPHI FCNL RNRA 9900.0000 GR 3.5469 NCNL 31.9824 NRAT 381.5000 GR 3.2500 NCNL DEPT RNRA NPHZ FCNL RNRA 9800.0000 GR 3.3184 NCNL 25.7813 NRAT 465.5000 GR 3.1602 NCNL DEPT RNR~ NPHI FCNL RNR~ 9700.0000 GR 3.4355 NCNL 41.0156 NRAT 302.7500 GR 3.7539 NCNL DEPT RNRA NPHI FCNL RNRA 9600.0000 GR 3.2715 NCNL 28.3691 NRAT 356.5000 GR 3.2031 NCNL 9EPT RNRA NPHI FCNL RNRA 9500.0000 GR 2.7188 NCNL 22.8516 NRAT 749.5000 GR 2.7363 NCNL OEPT RNRA NPHI FCNL RNRA 9400.0000 GR 2.9805 NCNL 32.7148 NRAT 397.7500 GR 3.1621 NCNL 38. 1241. -999. -999. -999. 38. 1254. 3. 36. 1272. 47. 1494. 2. 43. 1467. 40. 1128. 3. 40. 1153. 16. 1208. 2. 16. 1167. 24,. 2040. 2. 30. 2064. 26. 1355. 3. 25. 1297, 0313 0000 2500 2500 2500 0313 O0 O0 1562 4375 0000 4375 0000 8164 2500 0000 7188 0000 6523 3125 0'000 8594 0000 9590 4688 0000 8906 0000 6582 2500 0000 2344 0000 1992 1719 0000 NPHI FCNL RNRA NPHI FCNL NPHI FCNL RNRA NPHI FCNL NPH! FCNL RN RA NPHI FCNL NPHI FCNL RNRA NDHI FCNL NPHz FCNL RNRA NPHI FCNL NPHI FCNL RNRA NPHI FCNL NPHI FCNL RNRA NPHI FCNL 0 0 0 0 0 O' 0 0 34. 356. -999. -999. -999. 33. 353. 3. 32. 391. 28. 450. 3. 24. 464. 37. 328. 3. 39. 307. 28. 369. 3. 31. 364. 24. 750. 2. 23. 754. 33. 454. 3. 30. 410, 1797 0000 2500 2500 2500 0078 5O00 4258 5684 2500 7109 0000 1074 6582 0000 7930 2500 9687 9902 0000 2715 2500 3086 8848 2500 9512 0000 8164 2422 0000 3496 5000 4336 4199 0000 1 68 00000000000000 1 68 00000000000000 1 68 00000000000000 1 68 00000000000000 1 68 00000000000000 I 68 00000000000000 1 68 00000000000000 1 68 00000000000000 NRaT 3.2773 GR -999.2500 NCNL -999.2500 NRAT -999.2500 NRAT 3.2129 GR 30.4063 NCNL 1307.0000 NRAT 3.1895 NRAT 2.9785 GR 46.2187 NCNL 1447.0000 NRAT 2.7539 NR~T 3.4766 GR 38.1875 NCNL 1202.0000 NR~AT 3.5977 NRAT 2.9531 GR 15.6641 NCNL 1180.0000 NRAT 3.1523 NRAT 2.7715 GR 2T.6406 NCNL 2112.0000 NRAT 2.6777 NR~T 3.2324 GR 27.7656 NCNL 1366.0000 NR~T 3.0723 LVP 010.H02 VERIFICATION LISTING PAGE 5 DEPT 9300.0000 GR RNRA 1.9287 NCNL NPHI 10.0586 NRAT FCNL 1135.0000 GR RNRA 2.1816 NCNL DEPT 9200.0000 GR RNRA 4.9492 NCNL NPHI 53.6621 NRAT FCNL 360.5000 GR RNRA 5.1055 NCNL DEPT 9194.5000 GR RNRA 4.3711 NCNL NPHI -999.2500 NR~T FCNL -999.2500 GR RNRA 3.636T NCNL 34.2187 NPHI 2132.0000 FCNL 1.7607 RNRA 36.3750 NPHI 2072.0000 FCNL 76.7500 NPHI 1660.0000 FCNL 4.3477 RNRA 64.6250 NPHI 1616.0000 FCNL 81.0000 NPHI 1476.0000 FCNL -999.2500 RNRA 69.6250 NPHI 1~26.0000 FCNL 10.8887 1105.0000 1.8477 12.2559 949.0000 61.2305 335.2500 4.4258 54.5898 316.5000 47.5586 337.5000 -999.2500 42.3340 392.0000 NRAT 1.8281 GR 38.1250 NCNL 2098.0000 NRAT 1.9375 NR~T 4.7617' GR 71.8750 NCNE 1596.0000 NR~T 4.3945 NRAT 4.0075 GR -999.2500 NCNL -999.2500 NRAT 3.7246 ~.mILE 'TRAILER ~'~',--, FILE NAME :EDIT .001 SERVICE NAME : VERSION ~ : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME : · ~ FILE HEADER ~ FILE NAME :EDIT .002 SERVICE NAME : VERSION ~ : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE : -, .... DATA FORMAT R~CORD,. -,-"'.~ ENTRY BLOCKS TYPE SIZE REPR CODE Z 1 66 4 1 66 8 4 73 9 4 65 15 1 66 0 1 66 O~TUM MNEM SPECIFICATION SERVICE SERVICE ID ORDER ~ BLOCKS UNIT API LOG FT O0 API API API FILE TYPE CLASS MOD NO. 000 O0 0 0 ENTRY 0 1 10 .liN t 0 SIZE SPL REPR PROCESS CODE (OCT&L) 68 00000000000000 LVP 010.HOZ VERIFICATION LIST!N~ PASE 6 CCL PS1 O0 CCL oS2 O0 CCL PS3 O0 150 Ol 0 0 150 Ol 0 0 150 O1 0 0 DATa. '""'-,--,. DEPT 9909.4!60 CCL DEPT 9900.2500 CCL DEPT 9800.2500 CCL OEPT 9700.2500 CCL DEPT 9600.2500 CCL OEPT 9500.2500 CCL OEPT 9400.2500 CCL DEPT 9300.2500 CCL DEPT 9200.2500 CCL DEPT 9194. 5000 CCL 0.0166 CCL 0.0166 CCL -0.0776 CCL 0.0820 CCL 0.0601 CCL 0.0103 CCL -0.1802 CCL 0.2563 CCL -0.0820 CCL 0.0059 CCL $$ FILE TRAILER ~ FILE NAME :EDIT .002 SERVICE NAME : VERSION m : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : NEXT FILE NAME : EOF ~~~ .... ~ TAPE TRAILER ~ SERVICE NAME :EDIT DATE :86/11/20 ORIGIN :FS1A TAPE NAME : CONTINUATION ~ :0I NEXT TAPE NAME : COMMENTS :LIBRARY TAPE ~--,- REEL TRAILER " .... SERVICE NAME :EDIT DATE :86/1~/Z0 ORIGIN : I 68 00000000000000 1 68 00000000000000 I 68 00000000000000 -999.2500 CCL 0.1055 CCL -0.I011 CCL -0.0249 CCL -0,.0513 CCL -0.0205 CCL -0.16~1 CCL 0.070.3 CCL 0.0747 CCL -999.2500 CCL -999.2500 0.0513 -0.0908 0.0381 0.0674 -0.0469 -0.0674 0.0029 -0.1582 0.0~39 LVP OlO.H02 VERIFICATION LISTING PAGE 7 REEL NAME : ~ ~ CONTINUATION ~ :01 NEXT REEL NAME : COMMENTS :LIBRARY TAPE P~E I PREVIOUS REEL DATE TAPE NAt,~E :9b02 PRE~!OU~ T~PE COMMEN , ~ · SERVICE . DATE : PREVIOUS FILE ** iNFOrmATION RECORDS Wa : 13-1 FN ~ PRUDHOE BAY RANG: I 4R TOWN ~ ~ 0-, SECT: COUNt ~ , SbO~ STAT: . 000 000 000 000 000 000 000 000 000 000 SIZE 015 0O4 011 ~0~ 0 2 00 ? Ob 003 O65 065 065 065 065 065 065 065 065 LVP OlO.N02 V~:RIF'I..ATiOi~ LISTING ALASKA DIVISION CO. MPOTiMG- CFNTgR COMPA~'~Y ALASMA WELL ~IELD = PRUPHOE COUNTY = N.SLOPB TAPE DMNSITY = BO0 BPi ~ : ' ~ ~ ~ . :~ ~. ~ ~. ,~ , ,, , ,~,,,~, ,~,,., ~.,,,,, ,,, , -. JOB ~ 69502 BASE :. bOG.: '. CNL '~ RUM ~: 4 DATE hOGGED 8-31-84 ' ~Ot, bOG IMILRVAL - ~8~b FT. TOP CASIMG,,.LOGGER BIT TYPE V ISCO5 PAGE LVP OIO.M02 VEPlFICATIOm LISTING PH = 0,00 FbUID LOSS = 0.00 F PM ~ PEAS, TEMP, = 0.000 ~ 0 R~F P ~E~S, TE~P, : 0,000 ~ O F RMC ~ ~EA$, TEMP, = 0,000 ~ O F ~ATRIX = SANDSTONE LDP: T HALSTEAO ** DATA FORMAT RECORD ** ENTRY BLOCKS TYPE SIZE 2 1 9 lb 1 0 66 0 73 6O DATUM SPECIFICATION BbOCK~ ~NE~ S~RV1CE SERVICE U~IT ~PI ~PI APl ORDER # LOG TYPEC~AM$ M'OD<~<'~NO~<<~~<~>JCOD~ i<~<~.~( oo ooo oo 0 ~ 4 I ~8 ooooooo0oooooo oo ~9o oo 6 0 4 ...... 1 68 '00oo000o0000o0 DEPT GR PS1 NpHI NRAT RNRA P~I NCNb FCNL GR NPHI P$2 NRAT P$2 RNRA P62 NCNb PS2 FCNL GR PS3 NPHI P~3 NRAT RNRA NCNb P$3 FCNb P$3 FT GAPI PU oo ooo 65 6 ....... -6"~'i 6$'O0o'oOooooo00'OO CPS 00 33~ cps o0 §]0 ' ~5 ~ < 6 ..... 4~ i~ 6~ 000o0o0o0ooo0o GAPI 00 310 pu oo ~'0~ ~6 6 ~ ~ 6~'0o'0o0'o0o0o'0'ooo O0 420 05 606 65 ~ 6~ ~ -~ 6~ 00000000000000 CPS O0 330'; GAPI O0 310 ~ -01=~ ~Om <~0~>;~'i::1%~ oo ooo oo '6 0 ~ i' 6~ 000o0o000o000o CPS O0 330 31 cps oo ~3o 30'0 0 4 .... ~'i gi''O'ooooooooooooo ~VP 010,[{0~ VERIFICATION DEPT 9011,5000 G~ RNRA 3,5762 NCNb NPHI Zg99 2500 N~AT FCNL -999:2500 GR RNRA -g99.2500 NCNb DEPT 9900 0000 (;~ ENEA 3:4180 NCNL NPHi 34,7656 NRAT FCNL 396.2500 GR RNRA 3.5469 NCNb DEPT 980~,0000 ~ RNRA .4941 NCNb NP~I 29,19q2 NRAI FC b 431,5000 ~R RNRA 3,¢)820 NCNb DEPT 9700 RNRA 4 NpHI 45 FCNL 257 RNRA 4 DEPT 9600 RNRA 3 NpHI 29 FCNL 403 RNRA 3 0000 414i NCNb 5078 NRAT 500O 0664 NCNb ,O00U GR ,2090 NCNb ,7363 NRAT ,5000 GR .1465 NCNb DEPT 9500 0000 GR RNRA 2:8770 NCNb NPHI 22.6074 NRAT FCNL 765.5000 GR RNRA 2.9082 NCNb DEPT 9400 0000 GH RNRA 3:9219 NCNb NpH1 37,2070 NRAI~ FCNL 431.~500 GR RNRA 3'464~ NCNb OEPT 9300 RNRA 1 NPHI 8 FCNb 1688 RNRA ~, DEPT 9295 RNRA 2 NPH1 6396 NCNb 4473 NRAT 0000 ~R 7179 NCNb · o000 GR 7b NRAT i, IbTING ~3.0938 ,,~PHI 35,1074 NRAT 3'328i -999,2500 FCNG -999,2500 ~391,0000 FCNL 3; 43t. 6' NCNb i481. 0000 3~0039 RNRA A ~ 8 8 4 ~ ~ 8125.~ '::~ .'<~ ~.~.>.: ~:~ <:-,:::~ :.]:- :~ · :~:';,~';~ ~:2~ <I/~: 1382.0000 FCNL 448.2500 - _' ~::-:: :~ ::' z%L--': :'-' -: ::-- -~-.- - :- "' -:' -: 1171,0000~ FCNb~' -~'~ ~:2 .~::: ~ ~:, f:::' 3,900A R~A 4~ 4805 NcNb 1199,0000 40.5938. :~'~ ~:.:.~.~: ~.~<>~:~::~-~L : ~': ~]~. 1174,0000 FCNL !4.6094 NPHi 2~ 1738 NRAT 2,9492 I 9 ;2:7 ~ ~; 6'~2~ k~RA ..... 2'; 8~59 NCNb ' 2172,0000 21.4~;0000 rCNg 736;5000 3 1498 36 295~ '-40 2736 43 250~, 562 42%9 ~M'~l~:::~ ;~ ~L~ <.. :> :~/'T~: ' ::~]~<3'~ ~':<~:::~<<~:~':~:~::./ :~<:: .' -. 0000 FCNb 432,2500 6.000::~' ' '~'~:::~:" 1{~2 ',~f:: ~::'-.:>:;' ~'::~: 6<~~gF~:::'~:J~:.~:~'~:::.: < ;:::: : : : ;_ <:: :: <:_ <<:;: 4~:.~,:~:<:~,~::):~"::;~;~.:~;.:~;jj'~'::~:~:~:- .J:;':~< ::::. <;~. '~:, ~; ;'h_:rj~::: t~:;.tt :::- ':~:..:;-:~ :~.~'~ · ~:::: ;-:j < .': -:~ :::.:: ! LVP OlO,H02 VERIFICATION bISTING rCNb 1203 OOO0 GR RNRA -99g~2500 NCNb ** FILE TRAILER FILE NAME :EDIT ,0Ol SERVICE NAME VERSION # DATE : MAXIMUM LENGTH : 1024 FILE TYPE NEXT FILE NAME : ** TAPF TRAILER ** SERVICE NAME :EDIT DATE :84/09/10 ORIGIN :0000 TAPE NAME :9502 CONTINUATION ~ :01 NEXT TAPE NAME : COMMENTS : *, REEL TRAILER SERVICE ~AME :EDIT DATE {84/09/10 ORIGIN ; REEL NAME CONTINUATION ~ :01 NEXT REEl, NAME COMMFNTS : -999,2500 FCNL '999,2500 EOF ********** · I l I I ! I IT IT ! [ II Il TI II lI!l YY YY ¥¥ YY YY ¥~ IISt:,:{,( PCCC [10706,54607.! S~:,S KLI. O[~]I 21-NOV-78 13St<il: VFjRIFY. 005<057 > [ 10706,54b()71 C RELATF~'f]: pRII~TEIJ): 03-FEB-79 20:46:31 /SPACING:I /bier}IT:384 6541 {3ATE 03-FEB-79 02-FEB-79 !9:13:05 20:~4:01 PACIFIC COAST COMPUT]LNG CENTER i o70.~ ~ 54607 DAT~ 79/ 2/02 TAPt: ['APE ,,qA~E: 54607 I'APE CONTINUATION PR~]V lOllS [)ATE: 79/ 2/02 IjF:NG'r{{: 0~? BYTf<S FILE NAME: EDIT .On1 FlbE Ct)~,~aENTS Pi, EASE NOTE THAT PASSES ~i & ~2 ~ERE 8PL[C~TD {a 8~O0' wELl.., S.I. TI!] [NF[)RMATILt!',! RECf]R[) LENGTH: COSPAN~: WELL: FI~bD: ST~T~:: 1 4 3 ~YTES ATI, ANTIC RICHFIELD DRILL SITE i3-1 NORTH SLOPE A[,AS~A DA1'A ~R,",~AT SPt~JCTF.[CA'.IFTItr, i 250 K S .' ?YPK 0 SIZE REP Cf_)DE Et,~TRY ! 6~ 0 1 C ? J:':{ 0 L ,] HP{'I [ APl AP1 API AP[ FILEt~ S.[ZE KXP PR()C ,.q..Ai~[t REP DEPT [) E P T ~t 990O. 000 9'100, 900o 95 OO. ,'.)00 9~00o000 930o. 9~00 · 000 910t)·000 9000, ()o0 8900 o 000 8800,000 8700.000 8600 8500. 000 .a4o() · ooo 8 3 0 0. o 0 0 820O. 000 VALfIE -1.000 -0.429 27 ·900 77.22o 25.70O R7.0~7 41 ,500 49.764 ! I, ao(; 64.3St) ! 7,50(') 77.64q I 5. 900 70,35b 37.400 166·8H_1 56.9o0 46.761 42,000 2q,601 41.40o 2o.172 50.400 31.317 35.600 25.31 .! _39. 900 28.314 99 o 50(,) 20.60i 80.300 28.743 42.500 24.45] 55·900 27.027 74. 700 32.175 0. 000 0. 274 0.270 0. 397 O. 313 0.297 O. t15 0.121 0·515 0.540. 0. 566 0.546 0._683 0.542 0.5![9 0.514 (), 5~I 0.590 0.4a8 ~NEaF)NiC ~RAT N~A'r ~T ~T N~AT NRAT NRAT N~AT NRaT aRAT 0,000 3°990 3.29U 3.3'12 2.0S~ 4.452 4.7t~u 4.88~ 5,402 4.942 5.1bO NC NC F~I., NCNb NCNb NCNL NCNb NC v AI,(JF: '2'29.515 275, ,,.q, I 8 20.9,7~ !. 2i '1·5o3 254.~2b 2~o. 675 32~,614 ~15.35a i, 39. 854 I 39. I .37.7o!~ i3~.~77 I 4i .570 t27.842 122.265 142.428 '1 ~2.857 8 ! O0 o 000 ~000,000 FCNL GR FC~b v A b LiE 58.~00 28.743 - 1.0 0 0 0.0 o o NPH 1 VAL!JE 0.543 -0.050 O.OOO 4:9.292 0. [,EN(;']J}! (.)IF RE;C()RD,5: :{014 BYTES LE~',{GTH iiE bAST t~.ECt.}RD: 2'Y() BYTES FI{,,~J TaAI FILE 1024 BYTES TAPE Tt2AII_:EIR [,[iN(;Th: l, 32 15YTES TAPK N ANI~;: 54607 SI~;RV ICE ~',t A lv~ Itl: EL)IT 'I'APE Ct']NTINt_IATI[(jltl NEIt,,~R~_,R: 01 i~l F: X T TAPE D^TE: 79/ 2~02 FFFFFFFFFF FJF~ FF YY ¥¥ '¥ ¥ YY ¥¥ ¥¥ YY ¥¥ *$TAP,'P* FILE]: l~S~, [~: VF:R I FY. (.)0 ~ <057> [ 1070~, 54956j PRINTED: I_~-JAN-79 1.4:47:5~ /SPACINU:I /1,11qi1-':!27 /F'U~MStNURMAL [)ATE 3-J~N-79 !t-J~N-79 14:~7:30 1,4:44:!7 PAC I ~ iC COASt' CL]MPUTiNG CENTE~ 0706, TAPE C()N'FIN(~ATiON NUabEP~ ['REVIOIiS TAPE F~ACE: O] :4, ,I,: , t * , , LENGTH DATE:: TAPE 79/ !/13 .ATE. 791 !/13 024 RYTES W[:';I,I., 8 1 'FF: .LigF I, IE ~x~ G T b: v~ K L .I.;: F_'f F[.,O: S'['ATt: . ! 3~ byT[I,,'5 ATI~IlgTTC RI.k.H IEI.G,) Cf] D.S. PRUDHOK RAY N. SLOPE ALAS~ 1 SIZE ! 66 0 ENTF~ Y 1.) F: P (gP i) il, Cli,ih i'?IL (; R C N L C-/~ l., 1 CN'L D F h C) C~ r~ I., ~,l P H ] C N L lq P A 'I' C f.~ L N C/'! L C ~.;! E C N.L, Ci'~L GP P; HE' [) 't: R H C FT MV GAP ! Pti GtC ~ C/C CPS CPS US/E 0 7 7 7 7 42 42 ~2 ~2 42 6O 1 21 44 35 42 52 AP ] 0 0 44 8 32 ] 0 3 1 92 93 0 ,q 0 0 0 0 ¢) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ,5!Zk EXP PROC SA~'i REP DEPT SHIFT 4 0 0 1 68 0 0 4 0 0 I 68 0 0 a 0 0 1 68 0 0 4 0 0 I 68 0 0 4 0 0 1 68 0 0 4 0 0 1 . 68 0 0 4 0 0 1 68 0 0 4 0 0 1_ 68 0 0 q 0 0 I 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1 68 0 0 4 0 0 1. 6 8 0 0 4 0 0 I 68 0 0 c~goo. 0o0 oHO0. 000 q 7 (! 0.00 ~ l) q 6 t') 0. (') 00 q % 0 (). ¢) () ($ q4-rtO, o00 9 :~00. 9200.000 sP GR G? ,St:, Gk PHi tB G P SP GR GP S P GR GR SP GR SP GA $ P G R F~H~JH GP V AL {!E -999.000 2.~98 -q99. 000 25.52~D 5,990 2.664 9.373 '11 .570 53.451 2.3~,S 45.26~ '78. 224 2. 505 67.939 q8.421 84.145 2.606 e I. 340 8'7. 105 35.029 2.30C) 43.222 87.36~ 49.101 2.319 q0.000 4!.851 2.31~ 52.851 45.26'3 ~O.278 2.60.1 H1 .O38 2P, .421 94. q0o 2.465 1 I t). 4?5 2q.684 99.855 115.686 C ILD CAI,; I NRAT DT C1LD CA1; NRA_I; DT C I I,/[J CAb ,[ NRAT DT CI. LD CAb I N~.AT DT CILD CALl NRAT CILD CAI., Ni-<A OT C ILD CALI NP, AT DT C I LO CALl NRAT DT CILO CALl DqI C ILO CA!;I NRAT OT CILr) CALl N R A T DT 'VALI]E MNLM{)NIC VALUE MNEMONIC VALUE -99Q.OOO " M ~ CIL,., -Q99.000 CLL8 -999.000 7.479 DRHO 0.000 NPHi 0 O.. 004 NCNL 1,287 FCNL O~000- 429 -999.000 325.087 13.!.72 180.~02 1 ~ 007 ?:776 82..~50 106.660 15.239 ~.0116 70.400 246.604 15.882 ~.848 73.500 8't 2.832 ~i .g00 69.!83 !2.~00 2.q86 89.050 44 055 12:300  .018 9 .600 20,701 I )l. 402 I .740 59,450 608.135 16.157 52 654.636 10.800 4.048 J03.500 DRHO NCNb C IL~'~ DRHO NCNL CILM DRHO f': CNL CIL~ DRHO NCNL CILM D R H O NCNb C!L~i N C N L C t L M ORHU NC Nb C l LM DRHO NCNL C 'ir L F~ NCNb C TLN DR~ 0 N C N L 304.789 CLL8 244.343 0.067 NPHI 0.257 290.433 FCNL 82.368 154.170 CLL8 367.'069 NPHI .2 2 4 FC NL 444 CLL8 317.031 FCNL 231.206 CLL8 0,061 NPHi 239.382 E'CNL 7 2 3 Cbh 89:114 NPH~ 305. 448 FCNL 83,176 CLL8 .045 338,910 ~PHI .CNL 8~.376 CLL8 .056 NPHI 326.040 FCNL 101.859 0.242 1.28.271 54.450 0.252 124.8,39 190.546 0.380 69.069 66.681 0.260 106.392 80.168 0.295 1.1!.969 58.614 0.290 109.824 30.200 CLL8 5.649 0.013 PHI 532.8i8 ~ 0.1.08 CML, 283.998 138 CLL8 58~:169 NPHI 227. 370 EcNI[, 428.549 0.447 58.344 613.762 CILL8 478.6]0 0.269 NPH1 0.464 2331376 FCNL 57.057 i') h P T ~! ~. 000.00 i) R 7 o 0.0 () 0 A 6 {) 0. o 00 R 4 (', (?. n () 0 ~ :f(~0. 000 GR GP S P GP SP G R 8F SP 101.9{)9 2.5~2 1t2.907 I ! e~.'773 2.45~.: 120.15~ 3o.526 1.14.597 2.469 122.436 32.632 92.3E~ ~, 99.6O% 36.842 235.681 2.473 234.507 39.4'14 207.283 2.363 215.250 ~6 .or~3 1 O0. 942 2.465 10b.355 :'13.684 128.1 ~2 ?.417 ! ~1 .271 170.1~q 2.465 !79.514 34.737 140.941 2. 397 141.15~ 37.368 152.059 2.425 168.~92 Pi r:~.E,N{) N IC CiLD DT CILD CALI NRAT DT C i b D CALl DT CibD CALl NRAT C!LD CALl ~RAT DT C ILl) CALI NRAT D T CIbD CALI DT CiLD CALI CILD CAbI NRA'? OT CILD " I ,-AL NRA_? C ] LD CALl i,~ R A T D T 515.229 15.928 3.R3~ 102.O50 816.582 lO.708 3.976 113.t50 779.~30 !6.938 4.076 12.650 691.831 I6.;}95 93.600 497.529 15.422 4.228 102.750 398.107 14.q63 4 616 ~l.q~qO0 ~56.451 14 q17 3~6!0 96.050 704.693 3.fi08 !O7.250 515.2.29 15.O55 3.626 1 O5. 450 717.794 14.137 5i5.229 14.~58 't. 12 ql .650 C {,i C H b D R H Li NCNb C .I 1, f4 DRHU NCNL DRHO NCNb CI[,M ORHU C 1 l,s DRHO iUCNh C[LM DRHO C ,TLS NCNb CTL~ DRHO NCNL C DRHO NCNL C I L~ }~CNL VAL}JE MNEMONIC 478.b30 CLL8 0.065 NPHI 264.264 FCNL VALUF 325.087 0.409 68.640 758.578 Chh8 554.626 0.061 NPHI 0.4,31 230.802 FCNL 60.489 737.904 CLL8 554.626 0.122 NPHI 0.441 240.669 FCNL 59.202 597 0.35 CLLa 369.828 0~025 NPH~ 0.372 277.992 FCNL 77.220 436.516 CLL8 -0.005 NPH1 257.829 FCNL 340.408 0.449 64.350 376,704 CLL8 251.189 0.040 NPHI 0.500 228,228 FCNL 52.338 328.095 CLL8 0.012 NPHt 285.285 FCNL 67~.204 Chh8 O. 05 .~ NPHI 264.693 FCNL 496.592 CLL8 0.0 NPHI 271.1~ FCNL 666.807 Cbh8 0. 076 NPHI 256.1 13 FCNL 461.318 CLL8 0.001 NPHI 27g.276 FCNL 161.436 0.375 82.368 469.894 0.442 66.924 363.078 0.384 73.359 440.555 0.416 71.214 253.513 0.349 85.800 7700. t3 (){) 7600.000 75oO. 000 7 ~ O 0. () 0 0 7 ~ o o. 0 () 0 7200.0 O 0 710(). OOn 70(;0. oo0 ~-,q')0. OhO 8P GR S P GR S P SP ~P G~ G~ G~. RHf)}5 GP V~ 3 1 o hUE 7.8q5 942 8.16~ 8.g47 1 .517 2.367 0.473 10 Q5 2 95 12 9? 2 I.~ 8'7 105 .526 .50.g .43~ .833 .632 .242 .445 .684 ·89i .433 .065 5.263 3. O~R 2.423 17.895 q 3. 450 2.364 94. I 45 21 14! 2 I 4 t 17 loi 2 104 21 -1907 -999 -q~ 2.3 -1207 -999 .579 .505 .679 .~6~ .184 .452 .579 · ~55 .250 .159 .355 .250 a,~! EgtJN IC C 1LD CALl OT CILO CAbI NRAT OT C1 LO CAbi N[~AT CIL, D CALl' NRAT DT CILD CALl NRA T CIbO CALl N~AT ~T C I b D CALl NRAT DT C1 LD C~bI N E A T CILD CA~I NRAT OT C ILO CALl NRAT PT C1LO CA. bI 'MRAT DT 436.516 1.5 t01 3[428 90.500 ~66.807 t4.320 50!.187 14.g6~ ~.]44 90.500 46~ qo]~oO 409.~6I 1~.688 3.~76 8~.900 343.558 14.780 :ooo 291.072 I4.688 ].!08 89.050 299.22 16.24~ 96.650 452.R98 10.O65 3.508 94.800 ]80 189 '916:950 -999 25O '999:250 36~.078 -916.950 -999.250 ~NENi3N I C VALUE ~'4NEMONIC VALUE DRHO ~: 880 FCNL 94.809 Cigna 47a.~30 Cbb8 432.514 acNb 315:744 FCNL 92.664 4sz DRHO ,,:036 NP~I ' 0.333 C'IL~4 293.765 Chh8 ~65.46l [}~HU 0.027 NPHI 0.288 ~CNL 343.200 FC.NL 0.090 275.423 PHI 0. 335 NCNL 28 7. 430 FCNL 86. 229 CIL~! 444,631 CLL8 405.509 DRHO NPH~ NCNG 30~'041 0.338 . 0t 6 FCNL C.Ib~ 376 704 Chh8 353.183 DRHO -999~250 NPHI -999.250 NCNb -999.250 FCNL -999.250 CI],~ 369.828 CLL8 DRHO -999.250 NPHI NCNb -999.250 FCNL 334.195 -999.250 -999.250 /_____J ~) P, J' I' ,H 65 fi 0 . ¢) U 0 ~, ~ (:' 0.0 0 0 GP G SP 8P S P (; ? ~p GR ?4.737 -!207.355 -gqg.?Sn -~R8.3~5 94.¢74 -1207.355 -999.25o 7~.15[{ -1207.~55 -999.250 72.1(.)5 -!2o7.355 -999.250 -1707.355 -~99.250 45.52~ -1207._355 -999.250 -q88.385 47.368 -1207.355 -q99.25n 98.947 -1207.']55 -q99.250 -08~.385 10q. 4'74 - 12O7. ]55 -999.250 -988. ]85 53.684 -q99.250 -988.~85 92.105 -1207.355 -999.250 -989.3~5 Mil N [C C l [, D CALl DT CiLD CAI]I ~RAT PT CIbD CAb I DT C I b CAI, NRAT CILD CAbi ~RAT DT CILD CALl NRAT DT CILD CALk NHAT DT CALI RAT 0'I' CILD CAL.1 ~RAT DT C ILD CAi, I' NHAT D T C ILD CALl ~RAT V A L[IF 3t4.195 6 gso 99q.'750 -999,,950 248.~86 -916.950 .-99~ .'250 999.250 3!9.!54 -916 950 -999. 250 25] 513 -Q16~950 -999.250 -999.250 22o.aoo -910.950 -9q9.250 -999.250 4'74.242 -916.950 -999.250 -999.250 349.q45 -91 6 95o 999:250 -999.250 724 436 -'916[q50 ..99 250 -9991250 895.]65 -916.950 -999.250 3)4 1995 -916[ .50 9~ -~ 99 250 '999: 250 660.693 -9t0.950 -999.250 -999.250 i" CNb -999,250 FC L 99. 250 CTLM 237.684 CLL~ 2.39.883 DRHO -999.250 NPH -999.250 NCNb -999-250 FCNL -999.250 CIL~i 270.396 CLL8 144.544 -qqq [)RHO ~ .... 250 NPHI -999.250 ~,iCNL --99~50 FCNL -999.250 C l l,~X~ 20}.372 CbL8 118 0]2 DRH(J -.~9. ~250 NPHI -999;250 NCNb -999.250 FCNL -999.250 CILM 237.684 CLbB 237.684 DR~U -999.250 NPH1 -999.250 NCNb -999.250 FCNL -999.250 D RH (] NCNb 440-555 CbL8 .398.107 -999.250 NPHI 999.250 -999.250 FCNL -999.250 CIL~ 529 663 DRHO -999~250 NCNB -999.250 CLL8 167. 94 )',lPHI -999.250 F'cnu -999. so Clt, g 597.035 CLL8 92.897 DRH~ 9.9.250 NPHI -999 250 NCN. -999.250 FCNb -9991250 ,, l b.~4 296.483 C b8 .684 f)R~q 0 -999.250 N~ 237 HI -999.250 NC:Nh -999. 250 FCNL -999. 250 CIL~ 492.040 CLL8 208.930 L)RHO -999.250 NPHI -999.250 bJCNL -999. 250 FCNL -999. 250 5~7 i)O. OOr) % F, o 0.000 54 <) n. 000 ~, :20 {). 000 5100.00 () '50 u ('). t) {) () q qO{) o ¢)00 47()(). 0()0 MP GR C, P G~ SP SP G~ S P G F: SP G P GP SP (; F. V .a L U E -~207.]55 -q99. 250 4.9.21I -999.250 4~.A7I -1207.355 -99~.250 -988.385 -1207.]5% -u99.250 -988.3~5 -1207.355 -o99.25o -988.]85 79.211 -1207.355 -999.250 -989.385 ~2.632 -1207.355 -999.250 32.~95 -1207.35b -999.250 -988.385 32.i05 -1207.355 -999.750 -988.385 77.105 -1207.355 -999.250 -9~8.3~5 101.847 -120-/.355 -999.750 -98~.385 f'4 N F;M['IN ] C CILD NRA? UT CILO CALl mRAT DT CII,D CAI, I DT CILD CALl NRAT DT CILD CALI ~RAT DT C ILD CALl NRAT DT CILD CALl NRAT DT C iLD CALl NRAT OT C I L t) CALl NRAT DT C II, D CALl NRAT CILD CALl DT 258.226 -916.950 -999.P50 -999.250 190 546 -916~950 -999.250 444.631 -916.950 -999.250 -999.250 424.620 -9!6.950 -999.250 -999,250 436.516 -9!6,950 -999,~50 -9q9,250 608.135 -916.950 -999.250 -909.250 356.451 -916.o50 '999.250 '999.250 170 608 '916;950 -999,250 -99Q.250 296.483 -916.950 -99O.250 -999.250 387.258 -916.q50 -999.~50 -999.950 554.62'6 ~ 9 _: 25O -999,250 C :[La b ~ H 0 I.,RHO NCNB C DP. HO NCNL C I L a DRHO I~ C N L C ILtq CILM DRHO ~CNL C ?L N DRHO NCNB ILN NCNB CIL~4 DRHO NCNB CILM -- f DRHO NCNL DRHO mCNL VALUE 211..206 -.999 250 - 99: 5o 170.608 -999.250 -999,250 401.791 -999 250 999~250 405.50~ -999..9...50 -999.250 373.~50 -999. 250 -999.250 5of 187 -999:250 -999.250 310.456 -999.250 -999,250 201.372 -999.250 -999.250 296.483 -999,250 33i.131 -999.25O -999.250 444.631 -999 250 -99 : 250 gNEMONIC CLL8 NPHI FCNL CLL8 NPHI FCNL CLLB NPHI FCNL CN bLS PHI CLL8 PHI CNL CLL8 NPHI FCNL CLL8 NPHi FCNL FC N L CLL8 NPHI FCNL P H 1 FCNL CLL8 CNL VALUE 11.8.032 -999.250 -999.250 69.183 -999.250 999.2~0 *" 5 · 325.087 -9~9 250 -999.'250 340.408 -999.250 -999.250 237.684 -999.250 -999.250 258.226 -999.250 -999.250 ~01.014 -999.250 -999.250 18~.654 -99 .250 -999.250 277.971 -999.250 -999.250 216.770 -999.2.50 -999.250 218.776 -999.250 -999.250 I t4600. Ooa aqf)0.04;0 44 f:, 0.0 c) 0 4900. 4 ~ 00. 3900. 000 ~ 700.000 ~600.000 VA[..UE -1207.35.5 -qqq. 250 -q88.385 75.789 -1207.355 -99q.250 97. 368 -~ 207, -999,250 -988. 385 65.26 .] -1207.355 -99~. 250 77. ~6~ -1207,355 -999,250 -988. -1207.355 -999,250 -988.38R 53,42! -~ 2O7. ]55 -999,250 -988.385 -!207.355 -~99.25O -988, ]85 ~1 -1207,355 -999.250 -988.3R5 57. 368 -1207. J55 -~99.25n 66.316 -!207.355 -98U.385 b', N EM()NIC CII,D CALl C CAb, 1 NRAT D T C] LD CALl NRAT DT C ] LD CALi NRAT OT CI[:D CAB ,t NRAT DT CiI,D CAI~I NRAT DT CILD CALl NPAT DT C ILO CALI NRAT DT CILD CALf NRAT CILD C AL I NRAT DT C '[ LD CA~ NRAT D m VAL;iE 98. ! 75 -916.950 -qa9. 250 -999.250 452 898 -916:950 -999 250 544.503 -916.g50 -99Q.250 -999.250 30t 995  999o250 qgg. 250 246.60,4 -916.95(.} -999.250 -999.250 201 {72 -01.6:950 -99 250 '99~:250 14~.594 -9,.1.6.950 -gqq. 250 -999.250 167,.494 -91 6.950 999 2so ]. 31 ,826 -91 6.950 -999.25O -999.250 '124.738 -9.I 6.95O -999 250 -999:250 151 .~56 ...99.250 -999.250 .~NEHONIC VALUE C.I LM DRHO II, 3.763 CLL8 -999.250 NPH1 -990.250 FCNL 64.269 99.250 CILS 50¢,825 CLL8 DRHO -99 ,750 NPNI NCNL -999,250 FCNL 296.483 -999.250 -999.250 CTL¢4 452.898 DRHO 999 250 999:250 CLL8 224.905 ~PHI -99~.250 FCNb -99 .250 CI. LM 265.461 DRHO -999.250 NCNb -999.250 LL .959 PH~ 165 -999.250 ~" FC~L -999.250 C!LM 222.844 DRHO -999.250 ~CNL '999.250 CLL8 154.170 PH1 -999.250 CNL -999.250 CiLS 224.90~' DRHO -999.25( i~CNL -999.250  LL8 207.014 PHI -999.250 FCNL -999.250 C1LN RHU CNL 49. 968 CLL8 9 9 250 NPHI -999:250 FCNL 149.968 -999.250 -999.250  LL8 190.546 PHI -999.250 FCNL -999.250 CILM 147.231 RHO -999.250 CNL -999. 250 CLL8 152.757 NPHI -99~.250 FCNL -99 .250 ClbM DRHO NCNL 138.038 CLL8 -999.250 gPHI -999.250 FCNL 133.045 -999.250 -999.25O DRHO 149.968 CLL8 -999 250 ~PHI -999:250 CNL 143.219 -999.250 -9992250 :,140 0. (~ © 0 ~200.0OO -1 ! (,'0. ;/000.000 2 qO0. 2~C, 0. ?~20. 000 SP G t7 GP Gk RH(IF, GR GR G R GR GP (;R SP G R GR SP G R GR ~P Gl-< V A L U 48.421 - 1207. -99g. 25o -98-~. 385 48.421 -1207.355 -999.25o 82.105 -1207.35g -99q.250 -q88.385 51.842 -1207.35% -9qg.250 -1207.355 -999,250 -988.385 -1207.355 -999.250 47.368 -1207.]55 -g99.25o 96.842 -!207.355 -999.250 - 20.7R9 -1207. 355 -90-9. -988.385 197.105 -1207.355 -99q.250 CILD CAL/ NRAT UT ¢ I I.,, D CALl NRAT DT C iLD CALl DT CiLD CALl' NRAT DT C ill) CALl NRAT DE' C ILl) CALl NRAT DT C ILD CALl NRAT DT CILD CALl NRAT OT C ILD CALl NRAT DT CILD C~LI NRAT DT VALUE 1.49.968 -9t6.950 -999.250 -999.250 190.546 -916.~50 -999.250 -099.750 307.610 -916.950 -Oqq. 250 285.759 -916.950 ~999 250 337.2 87 91695(} 9q~: -999.2.50 428.549 -9t6.950 999 250 999;250 448.745 -916 050 'qOg]250 -999.250 ~19.441 '916.950 -25° .250 0. 032 -916. 950 -999.25O -999.250 9.204 -916.950 -909.250 N ~EME';NIC VALUE CIL~4 !69.O44 DRHO -999. 250 NCNL -999.250 HNEHONiC VALUE CLL8 159.956 NPHI -999.250 FCNL -999.250 C!La 21.6 770 DRHO -999:250 NCN~ -999,250 CLL8 203.236 NPHI -999.250 FCNL -999.250 C!La 277.971 i)RHO -999.250 f~CNL -999,250 CLL8 177.011 NPHI -999.250 FCNL -999-250 CILi~ 277.971 I)RNO -999. 250 :~ CNL -999. 250 bb8 235 505 PHI -999:250 FCNL -999.250 CILM 390.841 D~HO -999.250 Nt..'.Nh -999. 250 CLL8 346.737 NPH! -999.250 FCNL -999,250 C'[L~I 394.457 DRHO -999. 250 aCNL -999.250 CLL8 265.46g NPHI -999.25 FCNL -999.250 CILM 428.549 DRHO -999.250 NCNL -999.250 CLL8 428.549 NPHI -999.250 FCNL -999.250 CILM 505.825 CLL8 DRHO -999.250 NPHI. NCNL -999.250 FCNL 31 .99g '329 .250 -999.250 CILH 0.06.3 CLL8 ORHO -999.250 NPHI NCNL -999.250 FCNL 93~.562 -99 .250 -99 .250 C lLa 10. 186 DRHO -999. 250 C~]LL8 PHI NCNL -99. .250 FCNL 2.070 -999.~50 -999.250 1024 8~TES 79/ 1tl 3 DATF :82/06/24 REEl'.., ?.~' A Y, ['~ :RE~D Cfi~v~r,~Ef-~TS :~-E~ COMMENTS D~F- ~2/06/24 ORIGI~ :1070 IAPE ~'~F :65?33 CO~TI~,~UAYION ~ :Ol PPEVICUS T~PE~ CO~E~TS :TAP~ FIb£ ~AME VERSION ~ : O~TF : FILE TYPF : PREVIOUS FILE ** I~FORMATIO~ RECORDS Cf~ : AT,oA~-~%iC RICHFIELD COMPANY W~.~' : [~.S. 1]-1 Fi',~ : ~NLiDMOE BAY S~CT: 1 ~ ,,~ ', TH SLOPE STAT: A ;_., .~ S ~,~ ~ -- ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~.~,~ ~=:~'~=~ ~ ~':-~'~F~>};~=:':~..:":': :::'z ' :>?-:~ ?:..:...>-, :..':.:2~i ':, .':~:~> ::~ .~ -::- .': :,-: .' -:: ' F , : - ~ ~ ~ ~ ~ ~ ~ ~. ,. ~ ~ m ~ m ~ ~ '~ ~ ~'~ ~:~.~'.~;~-~:.~. ~ ~: ~, ~" "- :: :' ~:{{- ::>~ -..:: .. · ?..,- ~ · - - · ' - ~¢bL = O,S, 13'J COUFTY : NORT~ 8LOPE NOROOG~ STATF : A[,A~SKA JO~ NUMBER AT ACC~ 10707~6523~ RUN ~3, OATf; BOGGED: ~9 JUN 82 BOTTO~ D~P~H : 9916 FT, TOP DFPTH : giRO FT, TYPE FL, gl[> = CRUDE :-= .......................... _- 010 nnl V,.RIFICaTIO~,?F~ ;~IoTI~~" "] O~TU~ SPECI~ICATIO~ ~E~~ SE~VTC~ SE~ViC£ D~PT NDHI SO1 NRA~' NC~L FCNL $01 G~ S01 NP~I $02 NRAT $02 NCNL $02 FCNL 802 G~ $02 DATA ** ~ E,,PT FC~b 9943.0000 586 0000 -999~500 9~00.0000 4 : ooo 1~9~ 000 457.2500 1461.0000 9700.0000 317.7500 11~.0000 9600.O000 ~51.2500 1291.O000 gSCO.O000 1~4.0000 ' 9.0000 TYPE 4 9 0 42 _ .i, '~: .= .... :.:=~::.:',,,:0: ::~,,~..:' ........................ t:'~:' ......... ~:.-~, ........ 68.- ........ - .. ~ . 3 ~ 92'"::' "0:" ....... ::0':~;:~:''~:':':':~;'': :.:~-:~..::; ..::::_:: . ,: : .. 3 ~ ' 9~ <:~::~: ~..:. ~:~ ...::.~...., ::,:~ :.. :~ ::: :~:... .:.. ~ z 9 ~:'~ 3 i ~ 32 :;'.&:~:::::.~ :~:.~. .......... ...<.~...:..:::, 4 . 02 2 500: ~.~:o-~.::~.::;..:~T~:.;:.;',::.:::~:::;:-::~.::.:::~:~:.~:'~.: <~.-: <~ .;:._.;: :: ;:::: :: :.:~ :-_ _=:: . ~ ..... .... _ ~.-.......: .,:_ s~ ~ ,. r- .~.~.s, ::~?..- s;..,:~ .: ....... ._ ~, · :~, ~::....;~ ~ · .~ : : .::. .._:::~ .:.:.~: ::~- ..~:,~.:._~.;~.::~:.~;;..;:, ~;:.~...,;~:.::.~:.~.::::::~:?.::~: ~.:.~:..: ;~:;:.~.:..::.. :....::..:_>~:<; ~:~<~:.:: -:~: <:.;~):: ':f:~:'~ ;:~: ' . .:!:: ."~ : ~S~ ~ ',~ E:~.T ....... -:':': '::'~:~:~ ~;:~ ~:~'~'::~:~:~:':~:~:'-~:::,' :~ : - ~-.~: -'N~:~.t ..... .........,::-'~::~:3=:9:1,:'~<::'~;N~'A~.::-;~:'~-:::'~''..::~:'`-':~.~-'':.: 548-8'..:' .; ;::. ..: :~ .::.: :- .:_ :,: __ 1484 ~t~'3 : ~.~:T ....... : ~::~:~':~'g:6:~i' :::':: ;:;::: .:. :. · . , LVP 0~0.;~¢,l VEPIFICATIO'~ I,ISTING 1908,0000 DEP) g300,0000 NPHI FCNL 1677.0000 GQ NCNL 2264.0000 FCNb DE;PT 9200,0000 NPHI FCNI, 430.7500 GR ~CNL 2054.0000 FCNL DEP~' 9!72,5000 NPH1 FCNL 423.2500 G~ NCmL 1705,0000 BCN~ FILE ~AME :SERVIC,001 SERVICE ~;~ V~RSION # : MAXI~U~ LFmG~H : 1024 F~LE TYPE N~X~ FIbE SERVICE NA~E :SE~VIC DATE :~2f06/24 ORIGI~ :1070 NEXT T~PE SA~E : COM~f~,~'S :TAPE COMMENTS ** RF~L TRAILER ** SERVIC~ ~A~ :6ERVIC D~TE :~2/06/24 REEf, h~E :R~EL ID CG~'t~UATION # :01 COMmEnTS :REPL COMMENTS