Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
179-069
• Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, November 05, 2015 6:11 PM To: AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility OTL;AK, OPS GC3 Field OTL;AK, OPS GC3 Operators;AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers; AK, OPS Well Pad CX; Boman, Wade; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; Sayers, Jessica; Dickerman, Eric; Regg, James B (DOA); AK, D&C Wells CT Scheduler; Smith, Kelly Subject: OPERABLE: Producer X-02 (PTD #1790690) TIFL Passed All, Producer X-02 (PTD#1790690) passed a warm TIFL on November 04, 2015 indicating two competent barriers in the wellbore. The well is reclassified as Operable and may be brought back online as needed. Please call with any questions or concerns. Thank you, Whitney Pettus sGpNNED MAY 1 120i6 (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator OW 3a, Jrgan rattan WIC Office: 907.659.5102 WIC Email: AKDCWeIIlntegrityCoordinator@BP.com From: AlZ;D&C.Well Integrity Coordinator Sent: Tuesday, November 03, 2015 12:18 PM To: AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility OTL; AK, OPS GC3 Field OTL; AK, OPS GC3 Operators; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad CX;�Boman, Wade; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers, Jessica; Dickerman, Eric; Regg, James B (DOA) (jim.regg@alaska.gov); AK, D&C Wells CT Scheduler; Smith, Kelly; Womble, Arthur (Mark) M Subject: UNDER EVALUATION: Producer X-02 (PTD #1790690) Ready to�RIce on Production All, Producer X-02 (PTD#1790690) is now available for diagnostic work. At this time, the well has been reclassified as Under Evaluation so that the high inner annulus pressure reported this summer can be assessed. 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday,June 08, 2015 11:29 AM To: AK, OPS GC3&PCC OSM;AK, OPS GC3 Facility OTL;AK, OPS GC3 Field OTL;AK, OPS GC3 Operators;AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Team Lead;AK, D&C Wireline Operations Team Lead;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers; AK, OPS Well Pad CX;Wallace, Chris D (DOA); Glasheen, Brian P Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Well Integrity Coordinator;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Regg,James B (DOA) Subject: NOT OPERABLE: Producer X-02 (PTD#1790690) Sustained Inner Annulus Casing Pressure Above MOASP Attachments: image001.png All, Producer X-02 (PTD#1790690) inner annulus recently exceeded MOASP on June 05, 2015 with inner annulus/outer annulus= 2150/70 psi.The tubing pressure was unable to be read due to surface equipment requiring the well to be isolated.The annulus was subsequently bled down,with no repressurization observed, increasing the likelihood of downhole integrity. However, as the tubing pressure was unable to be monitored,this does not qualify as a sufficient barrier test.The well has been reclassified as Not Operable until further diagnostics can be performed. Please call with any questions. Thank you, SCANNED JUN 0 2015 Kevin Parks (Alter nate Whitney Pettis i BP Alaska-Well Integrity Coordinator G1/VGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com 1 n9 _ 0e9 Stephanie Pacillo DATE: 2 -Aug -13 DATA L GGED /1/2013 M K BENDER 23 p TRANS#: 6176 Data Manager Schiumbcrg®1' SIltleld Sei11iC8s ,�`�I�Vlakana K Bender WIRELINE RECEIVES � : 1. Natural Resources i�'Ctr11211c11I1 II 2SZ i arnbsil St, Sts. COQ Alaska Oil & Gas Conservation Commission Anellorsga, AK 99503 AUG 0 5 2013 `33 ti . 1 �v e; Shite 1�J0 ,.�slchcracte, as '-. ' �, .11 v,. 501 �`: Ofte:(907) 273.1770 AOGC - • r NAME'WT • MAs • r • •� • X-02 CBAF-00055I.QLAED ;L?i5'�� X PRINtS PRINTS N -14B CFGK-00004 X US—IT 18 -May -13 1 1 CD F -26C CEYC-00067 X MCNL W/ (PROF 18 -May -13 1 1 CD H -OSB CJSX-00005 X MCNL 30 -May -13 1 1 CD Z-32BL1 CCJZ-00040 X MCNL W/ BORAX 8 -May -13 1 1 co X-10 CBAF-00051 X MEMORY JEWELRY GR/CCL 28 -Apr -13 1 1 CD -046 BA 075 X USIT 25 -Apr -13 1 1 CD Z-67 C5X1-00075 I-0 X EDIT OF MCNL 10 -Mar -13 N/A 1 CD 09.45 CFZA.00006 X EDIT OF MCNL 18 -Apr -13 NIA 1 CD EDIT OF RST 26 -Jan -13 N/A 1 CD • X / Please return a signed copy to: X BP PDC LR2-1 Please return a signed copy to: Wireline 2525 Cambell St, Suite 400 SCANNED AUG 1 2013 STATE OF ALASKA RECEIVED SPSKA OIL AND GAS CONSERVA ONCAISSION REPORT OF SUNDRY WELL OPERATIONS JUL 0 3 2013 1. Operations Performed: AOGCC ❑Abandon ®Repair Well* ❑Plug Perforations ❑Perforate ❑Re-Enter Suspended Well .! Alter Casing • ®Pull Tubing . ❑Stimulate-Frac ❑Waiver ❑Other ❑Change Approved Program ❑Operation Shutdown ❑Stimulate-Other ❑Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. ` ❑Exploratory ❑Stratigraphic 179-069 • 3. Address: ' ®Development ❑Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-20397-00-00 • 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 028313 PBU X-02 • 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): USIT Prudhoe Bay/Prudhoe Bay 11. Present well condition summary: Total depth: measured 10460' feet ' Plugs:(measured) 9725(cmt ret),9941' feet true vertical 9442' feet Junk:(measured) 9930' feet Effective depth: measured 9725' feet Packer: (measured) 8887'/9930' feet true vertical 8758' feet Packer: (true vertical) 7997'/8945' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20"x 30" 110' 110' Surface 2869' 13-3/8" 2689' 2689' 4930 2670 Intermediate 9479' 9-5/8" 35'-9514' 35'-8567' 6870 4760 Production Liner 1443' 7" 9009'-10452' 8107'-9434' 8160 7020 Tieback 8978' 7" 32'-9010' 32'-8108' 7240 5410 Perforation Depth: Measured Depth: 9650'-9678' feet True Vertical Depth: 8691'-8716' feet 4-1/2", 12.6#/ 13Cr85/ 9052'/ 8146' Tubing(size,grade,measured and true vertical depth): 4-1/2", 12.6# L-80 9930'-9943' 8945'-8957' Packers and SSSV(type,measured and true vertical depth): 7"x 4-1/2"HES TNT Packer/ 8887'/9930' 7997'/8945' 7"Otis WD Packer 12.Stimulation or cement squeeze summary: Intervals treated(measured): ` SCANNED NOV 14 20113 Treatment description including volumes used and final pressure: Cut&Pull 5-1/2"Tubing.Mill and Retrieve 9-5/8"x 5-1/2"3H Packer,Pull 4-1/2"Tubing.Cut&Pull 9-5/8"Casing at 2554'.Cut 13-3/8"and 20"Casing at Surface.Run 9-5/8", 47#,L-80 from 35'-2557'.Cement 9-5/8"Casing w/165 Bbls,1.17 yield(792 sx)Class'G'.Run 7",26#,L-80 Tieback Liner from 32'- 9010'.Cement 7"Liner w/16 Bbls,1.17 yield(77 sx)Class'G'.Mill and Cleanout Cement Cap and Sand from 9555'-9930'.Set Cement Retainer at 9725'.Re-Squeeze Lower Perfs w/45 Bbls Class'G'.Run 4 -1/2",12.6#,13Cr85 Tubing to 9052'. 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 388 7546 6352 1500 300 Subsequent to operation: 0 0 0 120 240 14.Attachments: 15.Well Class after work: ❑Copies of Logs and Surveys run ❑Exploratory ❑Stratigraphic.®Development ❑Service Daily Report of Well Operations 16. Well Status after work: •®Oil ❑Gas ❑WDSPL ®Well Schematic Diagram ❑GSTOR ❑WINJ ❑WAG ❑GINJ ❑SUSP ❑SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: Dave Johnson,564-4171 Email: Dave.A.Johnson @bp.com 313-103 Printed Name: Joe Lastu Title: Drilling Technologist Signature: tk -Phone: 564-4091 Date:1/? /13 Form 10-404 Revised 10/2012 irL r ( o/70 / /3 RBDMS JUL - 8 201 Submit Original Only (oV�i7 ` • • X-02, Well History (Pre Workover) Date Summary 04/18/13 T/I/0=250/0/0 Conduct PJSM. Barriers=MV, SSV And TWC Start Barriers list.Verified by bleeding tubing pressure off MV and SSV independently. LTT PASS. Remove tree cap and RU CIW Lubricator with TWC#408. PT lubricator to low of 300 psi and high of 3500 psi for 5 min each pass. (for Each Break) RIH and set TWC tagging at 130". Remove 6x7 CIW tree and install 6x7 CIW Dry hole tree with Temporary ASV Valve#01.Torque Flangest to API Specs. Change out with BPV Crew. 04/20/13 INITIAL T/I/O =0/0/0. RUN IN HOLE W/3.475"JET CUTTER. CCL TO BOTTOM OF CUTTER=22.7' CCL STOP DEPTH =8777.3' CUT DEPTH =8800' DEPTH CORRECTED TO GLM AT 8718' USING TUBING TALLY DATED 11/11/84. POOH. RDMO.WELL HANDED OVER TO PAD OP ON DEPARTURE. FINAL T/I/0=40/40/0. 04/26/13 T/I/0=20/260/0+Temp=SI Circ Well, Freeze Protect F/L, CMIT-TxIA to 1000 psi(Pre RWO). Pumped 20 bbls neat methanol followed by 1181 bbls SW down Tbg taking returns up IA to X-01 F/L. Pumped 170 bbls diesel down Tbg taking returns up IA to X-01 F/L. U-tube TxIA to freeze protect. Pumped 10 bbls neat methanol& 102 bbls crude down X-01 F/L to freeze protect. CMIT T x IA to 1000 psi. FAILED.T/I lost 32/29 psi in first 15 minutes&29/27 psi in second 15 minutes.Total loss=61/56 psi. Bleed T/IA pressures down to 0/0 psi. FWHP=0/0/0. IA&OA OTG. SSV&wing closed. Master open. 04/28/13 T/I/O=SSVNAC/??.Temp=Sl.CMIT-TxIA to 1000 psi(Pre RWO). No AL, FL or Well House. IA FL @ 30'. IA has a strong VAC. Unable to see OA jewelry or valve handle due to plywood decking over cellar w/ drilling schaffolding sitting on top of plywood,will need to get loader to help readjust plywood to access OA. Unable to complete job due to lack of Vac truck. SV.WV,SSV,MV=Closed.Secondary MV=Open. IA=OTG. OA=??. NOVP. (2000 hrs). 04/29/13 T/I/O=VacNacNac.Temp=SI. CMIT-TxIA to 1000 psi w/Triplex-PASSED(eval SC leak).Wellhouse& flow line removed, drilling scafolding in place. Used 5.4 bbls diesel to pressure TBG/IA from 0/0 psi to 1001/1024 psi.TBG/IA lost 14/14 psi in 1st 15 min,and 6/7 psi in 2nd 15 min for a total loss of 20/21 psi in 30 min. Bled TBG/IA from 981/1003 psi to 0/0 psi in 30 min(3 bbls). Job Complete. Final WHPs= 0/ONac. SSV=C. MV, DBL MV=0. IA, OA=OTG. NOVP. 1330. 05/03/13 T/I/0=0/0/0 Conducted PJSM w/crew; Start barrier list; Barreirs=SV&MV(dry hole tree), I/A&0/A; Installed lubricator&P.T.to 300 psi/3500 psi (passed); Set 6"CIW BPV#419 @ 116"; Removed ASV #1; Installed tree cap&torqued to spec, P.T. (charted)to 300 psi/5000 psi(passed); Installed 3-1/8" valves on existing left side I/A&O/A valves(piggy backed);Torqued to spec.&P.T. (charted)to 300 psi/3500 psi (passed). Page 1 of 1 • • Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT r NPT Depth Phase Description of Operations (hr) (usft) 5/10/2013 00:00 - 00:30 0.50 MOB P PRE MOBILIZE RIG. -PJSM,SKID RIG FLOOR INTO MOVE POSITION. PJSM,MOVE RIG OFF WELL X-10. 00:30 - 01:00 0.50 MOB P PRE I STAGE RIG. ,-MOVE RIG NEXT TO X-02. 01:00 - 04:00 3.00 MOB P PRE PREP X-02 -SET UP RIG MATS FOR MOVING OVER X-02 -STAGE 13 5/8"DRILLING SPOOL,9 5/8"SLIP LOCK WELLHEAD,4 1/16"TREE AND ADAPTER FLANGE BEHIND WELLHEAD. 04:00 - 06:00 2.00 MOB P PRE MOVE RIG OVER X-02 WITH PJSM -SHIM AND LEVEL RIG. 06:00 - 07:30 1.50 MOB P PRE SKID RIG FLOOR. -SKID RIG FLOOR INTO DRILL POSITION. 07:30 - 10:00 2.50 MOB P PRE I RIG UP RIG FLOOR. -RIG UP ALL SERVICE LINES TO RIG FLOOR, SECURE BEAVER SLIDE INTO POSITION. -RIG ELECTRICIAN CONNECT POWER TO TOP DRIVE. -SPOT ROCK WASHER,FUEL TRAILER AND BREAK TRAILER. -PREP PITS TO TAKE ON FLUID. - t*RIG ACCEPTED AT 10:00 AM ON 5-10-2013. **NOTICE OF BOP TEST SENT TO AOGCC AT 08:00 5-10-2013. 10:00 - 13:00 3.00 RIGU` P PRE TAKE ON FLUIDS. -BRING ON 290 BBLS OF 120 DEGREE 8.5 PPG SEAWATER. -SIM-OP:HARD LINE CREW SPOT FLOW BACK TANK,NIPPLE UP HARD LINE FROM FLOW BACK TANK TO CHOKE SKID. -TEST HARD LINE TO 250 PSI LOW/3500 PSI HIGH,TEST GOOD. -RIG UP TO VOID DIESEL FROM WELL. 13:00 - 14:30 1.50 RIGU P PRE RIG EVACUATION DRILL. -CONTINUE TO RIG UP LINES IN CELLAR TO VOID WELL OF DIESEL. *CONDUCTED A RIG EVACUATION DRILL WITH 1C-CREW,RESPONSE TIME=4:30 MINUTES. **TESTED EMERGENCY SHUT DOWN SYSTEM,FUNCTION TEST SUCCESSFUL. ***HELD AFTER ACTION REVIEW,DISCUSSED RECENT INCIDENT,HIGH LIGHTED PINCH POINTS,HAND AND BODY PLACEMENT DURING RIG OPERATIONS. 14:30 - 16:30 2.00 VVHSUR P WHDTRE RIG UP HARD LINES FROM TREE TO CHOKE SKID. -RIG UP CELLAR CONT.,PREP TO TEST HARD LINES TO CHOKE SKID,PRIME MUD LINES. -BRING ANOTHER 290 BBLS OF 120 DEGREE 8.5 PPG SEAWATER. TUBING PRESSURE=0 PSI.,IA PRESSURE=0 PSI.,OA PRESSURE=0 PSI. Printed 6/17/2013 9:27:06AM • �'"/fir'" y''' ,/,::,,,,,,,, < %-i....,. ti North America-ALASKA BFI ! ff////7 � Operation Summary Report 4;;;04' ;��� Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs 1 Task 1 Code 1 NPT NPT Depth 1 Phase Description of Operations (hr) ____�__ (usft) 16:30 W - 17:30 1.00 WHSUR P WHDTRE TEST HARD LINES FROM TREE TO CHOKE SKID. -PJSM,TESTING MUD LINES AND HOSE TO FLOW BACK TANK. I TEST LINES TO 250 PSI LOW/3500 PSI HIGH 'FOR 5 MINUTES EACH,TEST GOOD. -BLEED OFF PRESSURE AND BLOW DOWN LINES. 117:30 - 18:30 1.00 WHSUR P WHDTRE 1MOBILIZE LUBRICATOR TO RIG FLOOR. -PJSM,P/U LUBRICATOR AND RIG UP. TEST LUBRICATOR TO 250 PSI LOW/3500 i PSI HIGH FOR 5 CHARTED MINUTES EACH. 1 18:30 - 19:00 0.50 WHSUR P WHDTRE 1RIG EVACUATION DRILL. I*CONDUCTEDA RIG EVACUATION/H2S DRILL WITH D-CREW,RESPONSE TIME 4:40 MINUTES. **HELD AFTER ACTION REVIEW 19:00 - 20:00 1.00 WHSUR , P DECOMP PULL BACK PRESSURE VALVE. -PULL BPV,TUBING PRESSURE=0 PSI. I -RIG DOWN LUBRICATOR. 1 1 - -RIG UP TO VOID WELLBORE OF DIESEL i I FREEZE PROTECT. 20:00 - 22:30 2.50 WHSUR P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT. -PJSM,PUMP 65 BBLS OF 8.5 PPG/120 I DEGREE SEAWATER DOWN IA,TAKE I RETURN OUT TUBING. -CIRC 5 BPM WITH 920 PSI -PUMP 195 BBLS DOWN TUBING. -CIRC 5 BPM WITH 930 PSI.,RETURNS FROM 1IA. *SPILL DRILL,ENVIRONMENT DRILL. 22:30 - 23:00 0.50 WHSUR P DECOMP FLOW CHECK WELL. -FLOW CHECK WELL FOR 10 MINUTES,WELL STATIC. -SHUT IN IA VALVE AND MASTER VALVE ON I TREE. -BLOW DOWN LINES. i*TUBING/IA/OA/=0 PSI 23:00 - 00:00 1.00 WHSUR P DECOMP INSTALL TWO WAY CHECK VALVE. -PJSM WITH DSM -RIG UP AND TEST LUBRICATOR. -TEST LUBRICATOR TO 250 PSI LOW/3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. 5/11/2013 00:00 - 02:30 2.50 WHSUR P DECOMP 1 INSTALL TWO WAY CHECK. -PJSM,INSTALL TWC. -TROUBLE GETTING TWC THROUGH THE MASTER VALVE PROFILE ON 7-1/6"DRY 'TREE. 02:30 - 03:30 1.00 WHSUR P DECOMP TEST TWO WAY CHECK, -PJSM,RIG UP AND TEST TWC FROM BELOW TO 3000 PSI. TWC NOT HOLDING. 103:30 - 04:00 0.50 l WHSUR N SFAL t DECOMP TROUBLESHOOT TWC. I 1-TWC LEAKING FROM ABOVE -TWC LEAKING FROM BELOW. — — 04:00 - 05:30 1.50 WHSUR N SFAL DECOMP REMOVE TEST LINES FROM IA.R/U LUBRICATOR TO PULL TWC. -PRESSURE TEST LUBRICATOR TO 250/3500 PSI 5 MIN.EA. 1-CHART RECORD TEST. Printed 6/17/2013 9:27:06AM `� � 9ddf df�' ; f° � o 4,;;;;',.-,), "/"7",..040 r i �� �� �// ce Common Well Name:X-02 X4 AFE No OX7N-E:(4,045,000.00) Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 05:30 - 06:00 0.50 WHSUR N SFAL DECOMP REMOVE TWO WAY CHECK I-PJSM,REMOVE TWO WAY CHECKAND INSPECT. *NO DAMAGE FOUND TO SEALS ON TWC. **SECOND TWC ON LOCATION. 06:00 - 07:00 1.00 WHSUR N SFAL DECOMP R/U NEW TWC.M/U LUBRICATOR. -PRESSURE TEST LUBRICATOR TO 250/3500 `PSI 5 MIN EA. -INSTALL TWC. 107:00 - 09:00 2.00 WHSUR P i DECOMP I PRESSURE TEST TWC ;-PRESSURE TEST TWC FROM BELOW TO 3000 PSI FOR 30 MIN.CHARTED. -PRESSURE TEST TWC FROM ABOVE TO 250 /3500 PSI 5 MIN EA.CHARTED. -R/D LUBRICATOR. *BARRIERS IN PLACE,8.5 PPG KWF AND TESTED TWC,CEMENT SAND PLUG AT 9555'. 09:00 - 10:30 1.50 WHSUR ., P DECOMP PJSM WITH CAMERON. -BLEED OFF ANY PRESSURE FROM CONTROL LINE AND HANGER VOID. -N/D 71/16"TREE AND 13 5/8"X 7 1/16" ADAPTOR FLANGE. l*CAMERON REP VERIFY AND INSPECT - f HANGER THREADS. . **7"IJ4S THREAD,7 TURNS. 110:30 - 11:30 1.00 ` WHSUR P DECOMP CAMERON REP FUNCTION AND RE-TORQUE I LOCK DOWN SCREWS. ,*BLOCK OFF CONTROL LINE PORTS IN I HANGER. **WITNESS OF BOP TEST WAIVED BYAOGCC REP.BOB NOBLE ON 5-11-13 AT 10:45 AM. 1 11:30 - 22:00 10.50 BOPSUR P DECOMP I N/U BOPE. -PJSM,N/U 13 5/8"BOPE. *UPPER RAM 3 1/2"X 6"VBR. *LOWER BLIND SHEAR RAM. *LOWER SINGLE GATE 3 1/2"X 6"VBR I-CHANGE BOP MUD CROSS SECTION TO NEW MUD CROSS WITH CERTIFICATIONS. -PER GWO RIG AUDIT COMPLIANCE. ;*SIM-OPS:WORK ON PREVENTIVE MAINTENANCE WORK ORDERS. **LOAD PIPESHED WITH 4"DRILL PIPE. 22:00 - 00:00 2.00 BOPSUR P DECOMP RIG UP TO TEST BOP EQUIPMENT. -DISENGAGE SAFETY JOINT FULL OPEN SAFETY VALVE. ,-TORQUE UP(2)4"FOSV WITH 4"DART VALVE,(1)4-1/2"FOSV. -TORQUE UP 7"IJ4S CROSS OVER TO 4" , TEST JOINT,7 TURNS TO TIGHTEN. -RIG UP TO TEST BOP WITH 4"TEST JOINT AND 5-1/2"TEST JOINT. II *OA PRESSURE=0 PSI. I*IA PRESSURE=0 PSI. 5/12/2013 00:00 01:30 1.50 BOPSUR P DECOMP ,RIG UP TO TEST BOPS. -FILL BOPS WITH WATER. -SHELL TEST BOPS. -FILL GAS BUSTER UP WITH 6 BBLS. *KICK DRILL(D2).RESPONSE TIME 2 MIN 10 , tSEC. Printed 6/17/2013 9:27:06AM North America-ALASKA BP $ q Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00.00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 09:00 7.50 BOPSUR P DECOMP TEST BOP. -PJSM,TEST TO 250/3500 PSI FOR 5 CHARTED MINUTES EACH. -3.5"X 6"VBR'S TESTED WITH 4"AND 5.5" TEST JOINTS. -ANNULAR PREVENTER TESTED WITH 4" TEST JOINT. -TEST FOSV AND DART VALVE. -TEST BLIND SHEAR RAMS. -TEST MUD CROSS VALVES. -TEST CHOKE MANIFOLD VALVES. -PERFORM ACCUMULATOR DRAW DOWN TEST. 09:00 - 10:00 1.00 BOPSUR P DECOMP RIG DOWN'TEST EQUIPMENT. -BLOW DOWN CHOKE AND KILL LINE. -RIG DOWN TEST EQUIPMENT. 10:00 - 12:00 2.00 BOPSUR P DECOMP RIG UP DUTCH RISER AND LUBRICATOR TO PULL TWO WAY CHECK. -P/U DUTCH RISER AND NIPPLE UP. -P/U LUBRICATOR AND TEST. TEST TO 250 LOW/3500 PSI HIGH FOR 5 CHARTED MINS.EACH. 12:00 - 13:00 1.00 BOPSUR P .DECOMP PULL TWO WAY CHECK. -FLOW CHECK WELL FOR 10 MINS.AFTER PULLING TWC,WELL STATIC. -RIG DOWN LUBRICATOR AND LAY DOWN. -VOID STACK OF FLUIDS. ,-RIG DOWN DUTCH RISER,GREASE AND INSPECT DUTCH RISER LOCK DOWN PINS. 13:00 - 15:30 2.50 BOPSUR P DECOMP RIG UP TO PULL TUBING HANGER. -MOBILIZE SLB CONTROL LINE SPOOLER AND TOOLS TO RIG FLOOR. -P/U SHORT BAILS,5.5 TUBING HANDLING EQUIPMENT AND DOUBLE STACK TONGS TO RIG FLOOR. -RIG UP SHORT BAILS TO TOP DRIVE. -TORQUE UP SAFETY JOINT WITH 4"FOSV AND 8'PUP JOINT. -MAKE UP LANDING JOINT WITH BOTTLENECK XO AND 7"IJ4S XO. 15:30 - 17:00 1.50 PULL P DECOMP PJSM,PULL TUBING HANGER. -IA PRESSURE=0 PSI.,CAMERON REP.BACK OUT LOCK DOWN SCREWS. -PULLED HANGER,210K TO BREAK FREE. -ESTABLISH PARAMETERS:PUW=195K, SOW=165K. -PULL HANGER TO RIG FLOOR,STRIPPED CONTROL LINE 35'BELOW HANGER. -RUN IN HOLE AND SHUT ANNULAR.' 17:00 - 19:00 2.00 PULL P DECOMP CIRCULATE. -CIRCULATE BOTTOMS UP THROUGH CHOKE AT 6 BPM WITH 170 PSI.,CIRC 414 BBLS. -FLOW CHECK WELL FOR 10 MINS,WELL STATIC. -OPEN ANNULAR AND CONTINUE TO CIRC SURFACE TO SURFACE VOLUME 133 BBLS Printed 6/17/2013 9:27:06AM North America-ALASKA B �� / i��7 � Operation Summary Report' Common Well Name.X-02 AFE No Event Type:WORKOVER(WO) 1 Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft)usft) 19:00 - 19:30 0.50 PULL P DECOMP LAY DOWN HANGER AND LANDING JOINT. -FLOW CHECK WELL FOR 10 MINS.,WELL I STATIC. -VOID STACK OF FLUIDS,BLOW DOWN CHOKE AND KILL LINES. -RIG DOWN HANGER AND LANDING JOINT AND LAY DOWN. *KICK WHILE TRIPPING DRILL(D1) 19:30 - 23:00 3.50 PULL P DECOMP PULU LAY DOWN 5.5"17#L-80 BUTTRESS TUBING WITH CONTROL LINE. ESTABLISH SLOW PUMP RATES WITH 8.5 PPG SEAWATER AT 8760'MD. -PJSM,POOH FROM 8768'TO 8056" *PUMP#1:20 STKS=20 PSI/30 STKS=40 PSI. *PUMP#2:20 STKS=20 PSI/30 STKS=40 PSI. 23:00 - 00:00 1.00 PULL N HMAN 8,056.00 DECOMP CHANGE OUT DOUBLE STACK TONGS. -PJSM,RIG DOWN 5-1/2"DOUBLE STACK TONGS,LAY DOWN. -P/U 8-5/8"DOUBLE STACK TONGS AND RIG UP. "C/O DUE TO THE 5 1/2"DOUBLE STACK TONGS HAVING TROUBLE BREAKING CONNECTIONS DUE TO TORQUE OF 5 1/2" TUBING. LL=IF PIPE SIZE IS AT MAX SIZE OF TONGS, GO TO LARGER TONGS IF AVAILABLE. I*OA PRESSURE=0 PSI. I*IA PRESSURE=0 PSI. 5/13/2013 00:00 - 00:30 0.50 PULL P DECOMP SERVICE RIG. -LUBRICATE DRAW WORKS,BLOCKS,AND TOP DRIVE. 00:30 - 09:00 8.50 PULL P DECOMP PULL 5.5"17#L-80 MODIFIED BUTTRESS TUBING. -PJSM PULL OUT OF HOLE,LAYING DOWN 5 1/2"COMPLETION. RETRIEVED 202 JTS OF 5.5"TUBING, 9-GLM'S,1-SSSV,1-SLIDING SLEEVE,25- RUBBER CLAMPS,3-SS BANDS. *CUT JOINT OF 5.5"17#L-80 BUTTRESS TUBING RECOVERED IS 3.5',CUT FLARED TO 6"OD *ALL CONTROL LINE BANDS AND CLAMPS RECOVERED COMPARED TO ORIGINAL RUN TALLY DATED 11-11-84. 09:00 - 10:00 1.00 PULL P DECOMP CLEAR RIG FLOOR. -LAY DOWN CASING EQUIPMENT. 10:00 - 15:30 5.50 FISH P DECOMP PICK UP PBR FISHING BHA#1. -PJSM,INSTALL WEAR BUSHING,(ID=12-1/2", OD=13-3/8",LENGTH=11") -MOBILIZE FISHING TOOLS TO RIG FLOOR -MAKE UP BHA#1 15:30 - 00:00 8.50 FISH P DECOMP 'RUN IN HOLE. -RIH FROM 325'TO 6790'PICKING UP DRILL PIPE SINGLES FROM SHED. MAKE UP DRILL PIPE WITH SPINNER HAWKS AND RIG TONGS. *KICK WHILE TRIPPING DRILL *OA PRESSURE=0 PSI. *IA PRESSURE=0 PSI. Printed 6/17/2013 9:27:06AM 2,7f.% !7,777 r ,r 9/ I,r. / fir ////i7 ft J ;/:., .000 f� ,fir t,,7,„,.. �r/�, . 0///f,- _'-001' ' f0°'/2 °00/*0,/,' 7 ',Of/07 '04.,,,,,t;'9,,,e",-/7 ai ® i w J' /r ,% / fi Ay �lf.,/f / Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay 7 Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase I Description of Operations (hr) (usft) 5/14/2013 00:00 - 01:00 1.00 FISH P DECOMP RIH WITH OVERSHOT ASSEMBLY WITH CUT LIP GUIDE SHOE TO RETRIEVE"G"SEAL ASSEMBLY. I I-PICK UP 4"DP FROM PIPE SHED F/6970'T/ I 1 :7730'. i 1-MAKING UP CONNECTIONS WITH RIG TONGS AND SPINNER HAWKS. 01:00 - 03:00 2.00 FISH i P , DECOMP SLIP AND CUT DRILLING LINE. -PJSM,SLIP AND CUT 59 FT. -RESET AND TEST CROWN-O-MATIC. I -LUBRICATE DRAW WORKS,BLOCKS AND TOP DRIVE. 103:00 - 04:30 1.50 FISH P DECOMP RIH WITH OVERSHOT ASSEMBLY WITH CUT I LIP GUIDE SHOE TO RETRIEVE"G"SEAL 'ASSEMBLY. I-PICK UP 4"DP FROM PIPE SHED F/7730'T/ , 8754'. 04:30 - 05:30 1.00 FISH P DECOMP ATTEMPT TO WASH OVER AND RETRIEVE"G" SEAL ASSEMBLY. -OBTAIN SPR'S FOR BOTH PUMPS. -20 SPM WITH 80 PSI,30 SPM WITH 150 PSI. -OBTAIN FISHING PARAMETERS PUW 210K, - SOW 170K,4 BPM AT 230 PSI,ROTW 190KAT 140 RPM,SPR AT 30 SPM 150 PSI,SPRAT 20 SPM 80 PSI, ` '-WORK OVER TOP OF FISH AT 8804' ROTATING AT 40 RPM AT 5K TORQUE PUMPING AT 4 BPM AT 230 PSI. -STOP ROTATING AND SET DOWN SEVERAL TIMES FROM 2-25K ON FISH WITH NO OVERPULLS OR PRESSURE INCREASE.. I II-STOP PUMPS ROTATE OVER FISH,SET DOWN 25K,P/U WITH NO OVERPULLS. -ATTEMPT ROTATING OVER FISH WHILE I I PUMPING 7 BPM AT 680 PSI,NO PRESSURE I INCREASE OR OVERPULLS. 05:30 - 09:00 3.50 FISH N WAIT DECOMP I WAIT ON WEATHER -CALL CH2MHILL TO CHECK ON AVAILABILITY OF TRUCKS TO SUPPORT THE RIG AND NO I SUPPORT AVAILABLE DUE TO LEVEL2 PHASE 1 I2 CONDITIONS. -SUSPEND FISHING OPERATIONS AND PULL I UP HOLE TO 8771'AND CIRCULATE AT 4 BPM 1 MONITORING WELL,UNTIL CONDITIONS IMPROVE AND SUPPORT IS AVAILABLE AT RIG. 1-NOTIFY RWO SUPERINTENDENT AND ODE. RWO SUPERINTENDENT CONFIRMED THAT HE WOULD NOTIFY WTL. 09:00 - 12:00 3.00 FISH P DECOMP ATTEMPT TO WORK OVER TOP OF FISH AS I I DIRECTED BY BAKER OIL TOOL REP. -VARIED RPM'S BETWEEN 0 TO 80. -VARIED PUMP RATES FROM 0 TO 2BPM.NO PUMP PRESSURE INCREASE OBSERVED. -NO OVERPULL OBSERVED. I i FLOW CHECK WELL. -FLOW CHECK WELL FOR 10 MINS.,WELL I STATIC. -STAND BACK ONE STAND OF 4"DP IN DERRICK. 1 I-BLOW DOWN TOP DRIVE. Printed 6/17/2013 9:27:06AM North America-ALASKA-B 44*,Xi4/21,,k,,',A444ix-544i;:MAliwiriee'stirrOOVi',%g4 Operation Summary Report -- - ---- ---------------- Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 17:30 5.50 FISH P DECOMP PULL OUT OF HOLE WITH"G"SEAL FISHING ASSEMBLY WITH CUT LIP GUIDE SHOE BHA. -POOH STANDING BACK 4"DP F/8775'TO 324'. 17:30 - 18:30 r 1.00 FISH P DECOMP HANDLE"G"SEAL ASSEMBLY FISHING BHA. -FLOW CHECK WELL FOR 10 MINS FOR NON-SHEARABLES ACROSS STACK,WELL STATIC. -INSTALL CROSSOVER TO FLOOR SAFETY VALVE FOR DRILL COLLARS AND TOP CROSSOVER FOR SAFETY JOINT. -PJSM,STAND BACK 3 STANDS OF 6-1/4" DRILL COLLARS IN DERRICK. -PULL TARS AND OVERSHOT ASSY OUT OF HOLE. *8-f/8"CUT LIP GUIDE ON OVERSHOT WAS BENT OVER,BREAK OUT AND LAY DOWN CUT LIP GUIDE. *CONTACT ODE OF RESULTS AND OBTAIN APPROVAL TO RUN DRESSOFF SHOE ON BOTTOM OF OVERSHOT. 18:30 - 20:30 2.00 FISH P DECOMP PICK UP"G"SEAL ASSEMBLY FISHING WITH DRESSOFF SHOE BHA. -MOBILIZE NEW BHA TOOLS TO RIG FLOOR. j-MAKE UP BHA,RIH T/325'. 20:30 - 00:00 3.50 FISH P DECOMP RUN IN HOLE VNTH"G"SEAL ASSEMBLY FISHING BHA. -RIH FROM 325'TO 7,636'WITH 4"DRILL PIPE FROM DERRICK. 'SPILL DRILL.RESPONSE TIME 3:40 MINS. *OA PRESSURE=0 PSI. 5/15/2013 00:00 - 01:00 1.00 FISH P DECOMP RIH WITH DRESSOFF SHOE OVERSHOT • ASSEMBLY TO RETRIEVE"G"SEAL ASSEMBLY. -F/7,636'TO 8,776'WITH 4"DRILL PIPE FROM DERRICK. -MAKE UP TOP DRIVE. 01:00 - 01:30 0.50 FISH P DECOMP ENGAUGE"G"SEAL ASSEMBLY. -ESTABLISH PARAMETERS:PUW=206K, SOW=180K,ROT=190K,TORQ=3-4K AT 60 RPM'S, 3 BPM W/150 PSI. -TAG FISH AT 8,804',DRESS OFF STUMP, SLACK OFF OVER STUMP TO 8,811',PULLED 250K. ATTEMPTED TO RELEASE LATCH,GRAPPLE SLIPPED,PULLED 275K,TRY AGAIN AND ROTATION BUILD TO 11K TORQUE. -RELEASED TORQUE AND PULLED UP TO 290K AND JARRED FREE. • Printed 6/17/2013 9:27:06AM orth America-ALASKA-B wow Operation Summary Reports Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 01:30 - 05:30 4.00 FISH P DECOMP •PULL OUT OF HOLE WITH FISH. -FLOW CHECK WELL FOR 10 MINS.,WELL STATIC. BLOW DOWN TOP DRIVE. -POOH F/8,811'T/420' -FLOW CHECK WELL FOR TEN MINS.,WELL STATIC. -INSTALL CROSSOVER TO FLOOR SAFETY VALVE FOR DRILL COLLARS AND TOP CROSSOVER FOR SAFETY JOINT. -STAND BACK LAST STAND OF 4"DRILL PIPE. *KICK WHILE TRIPPING DRILL(D1), RESPONSE TIME=2:15 MINS. 05:30 - 06:30 1.00 FISH P DECOMP POOH WITH DRESSOFF SHOE OVERSHOT ASSEMBLY BHA TO RETRIEVE"G"SEAL ASSEMBLY WITH FISH. -FLOW CHECK WELL FOR NON-SHEARABLES ACROSS STACK WELL STATIC. -LAY DOWN INTENSIFIER TO PIPE SHED. -STAND BACK THREE STANDS OF 6-1/4"DRILL COLLARS. -PULL FISH OUT OF HOLE. -RECOVERED 38.10'OF CUT 5-1/2"JOINT, 5.31'5-1/2"PUP JOINT AND BARREL OF"G" SEAL ASSEMBLY. -ID OF BARREL IS 4.875". 06:30 08:30 I 2.00 FISH P DECOMP HANDLE"G"SEAL ASSEMBLY FISHING BHA. -DISENGAGE TUBING PUP JT ABOVE THE BARREL AND RELEASE FROM OVERSHOT. -LEFT THE SHOE AND BUSHING ON,UNABLE TO DISENGAGE FROM BARREL. -THE SLICK STICK,SEALS AND LATCH REMAIN ON TOP OF PACKER AT 8,868'WITH TOP OF FISH AT-8,848'. 08:30 - 09:30 1.00 FISH P DECOMP PICK UP SLICK STICK OVERSHOT FISHING BHA WITH CUT LIP GUIDE SHOE. -MOBILIZE FISHING TOOLS TO RIG FLOOR • AND MAKE UP AS PER BAKER FISHING. • -RIH WITH 6-1/4"DRILL COLLARS FROM DERRICK T/306'. -PICK UP INTENSIFIER AND CROSSOVER AND RIH T/322'. 09:30 - 14:00 4.50 FISH P DECOMP RUN IN HOLE. -RIH WITH 4"DP FROM DERRICK F/322'T/ 8,773'. *OA OPEN TO FLOW BACK TANK FOR 6 HRS. NO FLUIDS RETURNED FROM OA. 14:00 - 14:30 0.50 FISH P DECOMP ENGAGE SLICK STICK FISH WITH OVERSHOT BHA. -ESTABLISH PARAMETERS:PUW=202K, SOW=180K,ROT=192K,CIR 4 BPM W/230 PSI. -SHUT PUMPS DOWN,RIH TAG FISH AT 8849', PICKUP AND TAG FISH WITH 20 RPM. -SET DOWN 10K WOB,RPM OFF,SET DOWN 25K WOB,ENGAGE GRAPPLE. -PULL 50K OVERPULL,HIT JARS TWICE,SET GRAPPLE. -RIH STRING WEIGHT 205K,BACK OUT SLICK STICK SEALS WITH 9 ROTATIONS TO THE RIGHT,LATCHED BACKUP AND CONFIRMED. Printed 6/17/2013 9:27:06AM orth America-ALASKA-BP ® Operation Summary Report 'r 2A4,24r2:224A14A0%*reelai02.2‘422/2422:%2% Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:00 0.50 FISH P DECOMP FLOW CHECK WELL. -FLOW CHECK WELL FOR 10 MINS.,WELL STATIC. -STAND BACK 1 STAND OF 4"DP,BLOW I DOWN TOP DRIVE. 15:00 - 19:00 4.00 FISH P DECOMP I PULL OUT OF HOLE. -POOH F/8,773',T/418'STANDING BACK4" OP. *FIRE DRILL. 19:00 - 23:00 4.00 FISH P DECOMP i LAY DOWN BHA WITH ANCHOR AND SLICK STICK FISH. -FLOW CHECK WELL FOR 10 MINS.FOR NON-SHEARABLES ACROSS STACK WELL STATIC. -STAND BACK LAST STAND OF 4"DP. -CROSSOVER FOR DRILL COLLARS MADE UP TO FOSV. -STAND BACK 3 STANDS OF 6-1/4"DRILL COLLARS. -ATTEMPT TO RELEASE SLICK STICK FROM OVERSHOT. -BREAK OFF CUT LIP GUIDE SHOE AND [BARREL EXTENSION FOR GRAPPLE AND LAY II DOWN SLICK STICK. *SLICK STICK AND LATCH ASSEMBLY TOTAL LENGTH IS 24.1'. 23:00 - 23:30 0.50 P ® DECOMP CLEAR AND CLEAN RIG FLOOR OF OVERSHOT BHA. 23:30 - 00:00 0.50 FISH N RREP DECOMP BRING IN ST-80 IRON ROUGHNECK THROUGH BEAVER SLIDE. *OA PRESSURE=0 PSI. 5/16/2013 100:00 - 01:00 1.00 FISH N RREP, DECOMP INSTALL ST-80 IRON ROUGHNECK AND FUNCTION TEST SAME. 01:00 - 01:30 0.50 FISH P DECOMP MOBILIZE TOOLS TO RIG FLOOR FOR MILLING/FISHING BHA. -REVIEW DOYON SOP FOR BEAVER SLIDE OPERATIONS. 01:30 - 03:00 1.50 FISH P DECOMP PICKUP AND MAKE UP MILLING/FISHING BHA FOR MILLING AND RETRIEVING 9-5/8"X 5-1/2"3H PACKER WITH TAIL PIPE ASSEMBLY. -PJSM,ASSEMBLE BHAAS PER BAKER FISHING REPRESENTATIVE AND RIH T/342'. 03:00 - 05:30 2.50 FISH P DECOMP RIH WITH PACKER MILLING/FISHING ASSEMBLY. -TRIP IN HOLE WITH 4"DP FROM DERRICK T/ 8,403'. 05:30 - 07:30 2.00 FISH P DECOMP SLIP AND CUT 59'OF 1-1/4"DRILLING LINE. -REVIEW DOYON SOP DURING PJSM. -WSL SIGN MANRIDER PERMIT TO HANG BLOCKS. -LUBRICATE RIG,GREASE DRAW WORKS, I BLOCKS,CROWN AND TOP DRIVE. *OA PRESSURE=0 PSI. **KICK DRILL,RESPONSE TIME=2:35 MINS. 07:30 - 08:30 1.00 FISH P DECOMP RUN IN HOLE WITH 4"DP FROM DERRICK F/ 8403',T/8793'. Printed 6/17/2013 9:27:06AM :;' e * ' Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 I End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 I Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. I UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) i 08:30 - 14:30 6.00 FISH P DECOMP MILL ON 9-5/8"X 5-1/2"3H PACKER. -MAKE UP TOP DRIVE. ,-ESTABLISH PARAMETERS:PUW=205K, SOW=174K,ROT=185K,6 BPM AT 670 PSI., RPM=80,TORQ ON=3-4K,TORQ OFF=7-9K, WOB=5-10K. -OBTAIN SLOW PUMP RATES WITH 8.5 SEAWATER AT 8,973'. -PUMP 1-20 SPM=80 PSI.,30 SPM=160 PSI. -PUMP 2-20 SPM=90 PSI.,30 SPM=170 PSI. I-RIH,LATCH INTO PACKER WITH PRTAT 8,876',RELEASED LATCH BY PUMPING 4 BPM AT 320 PSI. -LATCHED BACK ON AND STARTED MILLING I PACKER AT 8870' -MILL PACKER F/8,870'T/8,879'AT 6.2 BPM WITH 650 PSI.,80 RPMS WITH 5-6K TORQUE AND 4K WOB. • *OA PRESSURE 0 PSI. 14:30 - 17:00 2.50 FISH P DECOMP CIRCULATE BOTTOMS UP TO MITIGATE ANY PACKER GAS. -OBSERVED NO FLUID LOSSES POST MILLING OPERATIONS. -LINE UP AND CIRC 600 BBLS THROUGH MUD GAS SEPARATOR. -SHUT IN ANNULAR,CIRC 6 BPM AT 680 PSI. THROUGH FULL OPEN CHOKE. 17:00 - 17:30 0.50 FISH P DECOMP I FLOW CHECK WELL. -FLOW CHECK WELL FOR 10 MINS,WELL STATIC. -OPEN ANNULAR,PUMP DRY JOB. -BLOW DOWN TOP DRIVE AND CHOKE MANI FOLD. 17:30 - 21:00 3.50 FISH P DECOMP I'I PULL OUT OF HOLE. -POOH F/8793'T/433'STANDING BACK 4"OP IN DERRICK. 21:00 - 23:30 2.50 FISH P DECOMP I LAY DOWN MILLING/FISHING BHA FOR MILLING AND RETRIEVING 9-5/8"X 5-1/2"3H PACKER AND TAIL PIPE ASSEMBLY. -FLOW CHECK WELL FOR NON-SHEARABLES ACROSS STACK WITH LAST STAND OF DP ACROSS STACK,WELL STATIC. I-LAY DOWN INTENSIFIER,STAND BACK 3 I STANDS OF 6-1/4"DRILL COLLARS. I-BREAK OUT AND LAY DOWN REMAINING BHA. *PACKER AND TAIL PIPE RECOVERED. 23:30 - 00:00 0.50 FISH P DECOMP VERIFY TUBING HAS 0 TRAPPED PRESSURE, LAY DOWN 4-1/2"TAIL PIPE ASSEMBLY. -SWAP ELEVATORS TO 4-1/2"YT'S. -LATCH ONTO 3 JOINTS OF TAIL PIPE WITH "X"NIPPLE AND WLEG. -PULL ASSEMBLY COMPLETELY OUT OF HOLE INSERT STEAM HOSE INTO WLEG AND OBSERVE STEAM EXITING FROM JOINT IN ELEVATORS. 1*OUTER ANNULUS REMAINS OPEN TO FLOWBACK TANK WITH CONTINUOUS MONITORING. l *OPENED AT 18:00 HOURS ON 5-16-2013. Printed 6/17/2013 9:27:06AM North America-ALASKA Brip:/4 " %// , %®` i y ®% Operation Summary Report% / / r tkAt te -/A Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 ,X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 I Spud Date/Time:11/3/1979 12:00:00AM 'Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) - I Description of Operations 01:00 1.00 FISH - P _ (usft) DECOMP L PI Date From-To Hrs Task Code NPT NPT Depth Phase 5/17/2013 00:00 I BREAK OUT AND LAY DOWN TAIL PIPE I I ASSEMBLY. I I -CLEAN OUT BOOT BASKETS FROM MILLING ASSEMBLY. -70 LBS.OF METAL RECOVERED FROM 3 BOOT BASKETS. 01:00 - 01:30 0.50 FISH P DECOMP 1CLEAR AND CLEAN RIG FLOOR. I Ii-REVIEW DOYON SOP FOR BEAVER SLIDE IOPERATIONS AT PJSM. -DEMOBILIZE MILLING TOOLS AND BRING IN TOOLS FOR 9-5/8"SCRAPER ASSEMBLY. 01:30 - 02:30 1.00 CLEAN P DECOMP PRESSURE TEST 7"LINER AND 9-5/8" CASING. -RIG UP TEST EQUIPMENT AND PURGE AIR I FROM PUMP LINES. -CLOSE BLIND RAMS AND PRESSURE TEST 7" LINER AND 9-5/8"CASING TO 250/3000 PSI. FOR 5 CHARTED MINUTES EACH. -LOW PRESSURE TOOK 1/2 BARREL TO !ACHIEVE 250 PSI. -HIGH PRESSURE TOOK 7.7 BARRELS TO ' ACHIEVE 3100 PSI. -BLEED PRESSURE AND OPEN BLIND RAMS. [-RIG DOWN TEST EQUIPMENT. -BLOW DOWN KILL AND CHOKE LINES ALONG WITH CHOKE MANIFOLD FOLLOWING DOYON SOP. 02:30 - 04:00 1.50 CLEAN P DECOMP MAKE UP 9-5/8"SCRAPER ASSEMBLY AS PER BAKER. -PICK UP AND MAKE UP 9-5/8"SCRAPER I WITH JUNK MILL,BOOT BASKETS AND MAGNETS. -PICK UP AND MAKE UP BUMPER SUB AND I JARS. -RUN 3 STANDS OF 6-1/4"DRILL COLLARS T/ 343'. 04:00 - 08:00 4.00 CLEAN P DECOMP RIH WITH 9-5/8"SCRAPER ASSEMBLY. -PICK UP REMAINING 4"DP FROM PIPE SHED NEEDED TO COMPLETE WORK ON WELL AND I RIH T/976'. -RIH FROM 976'WITH 4"DP FROM DERRICK TO 8,414'. I Printed 6/17/2013 9:27:06AM North America-ALASKA BP; i Operation Summary Report , % Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 `X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay I Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 I 4.00 CLEAN P DECOMP PERFORM STRIPPING DRILL ACCORDING TO DOYON SOP. *KICK WHILE TRIPPING DRILL WITH NON-SHEARABLES ACROSS STACK -INSTALLED 4"FOSV AND CLOSED,PICKED UP AND MADE UP 4"SAFETY JOINT FROM PIPE SKATE,OPENED FOSV BELOW SAFETY JOINT AND LOWERED INTO STACK,CLOSED IANNULAR PREVENTER. -REMOVED HANDLING PUP JOINT FOR I SAFETY JOINT AND INSTALLED 4"DART VALVE. -MADE UP STAND#86,OPEN FOSV BELOW DART VALVE. -ENSURE NO PRESSURE ON ANNULUS AND OPEN ANNULAR PREVENTER. -LOWER STAND TO PLACE DART VALVE BELOW ANNULAR PREVENTER AND CLOSE ANNULAR PREVENTER. -PRESSURE UP ANNULUS TO 250 PSI, PRESSURE STABLE. I-STRIP IN HOLE F/8,434'T/8,509'FOLLOWING DOYON SOP. -ANNULUS PRESSURE INCREASE FROM 250 PSI TO 770 PSI. -BLEED BACK 1.5 BBLS.INTO TRIP TANK. PRESSURE ON ANNULUS DECREASED TO 230 PSI. -STRIP IN THE HOLE F/8,509'T/8,603'. -ANNULUS PRESSURE INCREASE FROM 230 PSI.TO 810 PSI. -BLEED BACK 1.1 BBLS.INTO TRIP TANK. PRESSURE ON ANNULUS DECREASED TO 1 330 PSI. -STRIP IN THE HOLE F/8,603'T/8,698'. -ANNULUS PRESSURE INCREASE FROM 330 I PSI.TO 850 PSI. ,-BLEED PRESSURE FROM WELL TO ZERO, FLOW CHECK,WELL STATIC. *4.9 BBLS.BLED BACK FROM STRIPPING 3 STANDS. *ANNULAR PREVENTER OPERATING PRESSURE WAS LOWERED FROM 650 TO 500 PSI. *POSITIVE SEAL ON ANNULAR PREVENTER OBTAINED DURING ENTIRE OPERATION. WHEN PASSING TOOL JOINTS THROUGH ANNULAR PREVENTER OPERATING PRESSURE WOULD DROP 150 TO 200 PSI. FROM THE SET PRESSURE AND RECOVER IN 5 TO 10 SECONDS. *WHEN DISPLACEMENT VOLUME FROM STRIPPING A STAND IN WAS BLED TO TRIP TANK OBSERVED OPERATING PRESSURE I DROP 50 PSI.AND RECOVER RIGHT AWAY. Printed 6/17/2013 9:27:06AM r4-2",,,- -/;,,77 ",17';',X%-,....,,, ,,:y'',4(77,./ $r..T.''," ITC-7-4-4,4';‘':::A//,":4/(9-,;;-0774 6'70"-'-'7"4„:-/,'"*-74-0,4%,,,,,40:T.4voli,/' r r � i � r/ l y� 1* r / i , / .r� f � t 4,A)' `i /!i rf Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) 1 I Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 12:00 - 13:30 I 1.50 CLEAN P DECOMP TEST ANNULAR PREVENTER,PJSM. i-TEST 4"DART VALVE AND ANNULAR PREVENTER WITH 4"DP. -TEST CHOKE VALVES 3,4,AND 6 TO 250 PSI LOW AND 3000 PSI HIGH FOR 5 'MINUTES-TESTS GOOD. I -BLEED ALL PRESSURE AND OPEN ANNULAR PREVENTER. 13:30 - 14:00 0.50 CLEAN P I DECOMP !POOH F/8,698'T/8,414'. -REMOVE 4"FOSV'S,SAFETY JOINT AND 4" DART VALVE FROM DRILL STRING. II-BLOW DOWN CHOKE AND KILL LINES. 14:00 - 16:00 2.00 CLEAN P DECOMP !9-5/8"CASING SCRAPER OPERATIONS. -RIH WITH 9-5/8"SCRAPER ASSY.F/8,414'T/ 8,888'. -MAKE UP TOP DRIVE. -OBTAIN PARAMETERS AT 8 BPM WITH 870 PSI.,PUW AT 200K,SOW=170K,ROT WT=185K W/3K TORQUE AND 60 RPM. ROTATE AND RECIPROCATE F/8,983'T/ I 8,880'SCRAPING 9-5/8"CASING. -CIRCULATE AT 10 BPM WITH 1300 PSI. 1 *600 BBLS CIRCULATED. -OBTAIN SLOW PUMP RATES. 16:00 - 20:30 4.50 CLEAN P DECOMP 1 POOH WITH 9-5/8"SCRAPER ASSY.F/8,888' TO 438'. 1-FLOW CHECK ON BOTTOM AND BEFORE ■ BRINGING NON-SHEARABLES ACROSS STACK, WELL STATIC. 20:30 - 21:30 -h 1.00 CLEAN P DECOMP LAY DOWN 9-5/8"SCRAPER ASSY BHA. -PJSM,STAND BACK 3 STANDS OF 6-1/4" I DRILL COLLARS. 1 I -BREAK APART AND UD JARS,CASING SCRAPER,BOOT BASKETS,MAGNETS AND JUNK MILL. II 21:30 - 22:30 1.00 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR OF ALL SCRAPER ASSEMBLY COMPONENTS. -REVIEW DOYON SOP ON BEAVER SLIDE I 1 OPERATIONS AT PJSM. 22:30 - 00:00 1.50 EVAL P DECOMP RIG UP SLB E-LINE. -PJSM,SPOT E-LINE UNIT ON DRILLERS SIDE OF RIG. -MOBILIZE USIT LOGGING TOOLS TO RIG FLOOR AND ASSEMBLE. *OUTER ANNULUS REMAINS OPEN TO FLOWBACK TANK WITH CONTINUOUS MONITORING. *OPENED AT 18:00 HOURS ON 5-16-2013. 5/18/2013 1 00:00 - 00:30 0.50 EVAL P DECOMP RIG UP SLB E-LINE. -FUNCTION TEST USIT TOOLS.TEST GOOD. , -ZERO DEPTH AT TOP OF ROTARY TABLE ON 1 !RIG FLOOR. 00:30 - 03:00 2.50 EVAL 1 P DECOMP I RUN IN HOLE WITH USIT LOGGING ASSEMBLY ON E-LINE. 1 -RIH AT 80 FEET PER MINUTE TO 8,850'WLM. *NOTIFYAOGCC FOR WEEKLY BOPE TEST AT 00:45 HOURS. Printed 6/17/2013 9:27:06AM North America-ALASKA BPS ' f iii .. ; operation Summary Reports Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 07:00 4.00 EVAL P DECOMP PERFORM USIT LOG IN CEMENT/ CORROSION MODE. -LOG UP TO SURFACE AT 40 TO 45 FEET PER MINUTE FROM 8,850'WLM. *SPILL DRILL AND FIRE DRILL. *TABLETOP MAN DOWN DRILL AND EVAC DRILL. 07:00 - 08:30 1.50 EVAL P DECOMP" REVIEW USIT DATA LOGS. -CALL RWO ENGINEER IN TOWN TO DISCUSS 9- /8"CSG CUT. 08:30 - 10:00 1.50 EVAL P DECOMP i RIG DOWN SLB USIT LOGGERS. -REVIEW DOYON SOP ON BEAVER SLIDE OPERATIONS AT PJSM. -CLEAR AND CLEAN RIG FLOOR OF ALL LOGGING TOOLS. 10:00 - 10:30 0.50 DHB P DECOMP i MOBILIZE HES 9-5/8"RETRIEVABLE BRIDGE ,PLUG TO RIG FLOOR. —PJSM,BEAVER SLIDE OPERATIONS. *HES REP EXPLAIN TO CREW HOW TOOL FUNCTIONS. 10:30 - 13:00 2.50 DHB _ P DECOMP RIH WITH HES 9-5/8"RETRIEVABLE BRIDGE PLUG ON 4"DP. -PJSM,RIH F/19'T/1,919'. -RIH F/1,919'T/2,583'AND MAKE UP TOP DRIVE. -RIH AND SET 9-5/8"RBP AT 2,654'CENTER j OF ELEMENT. -TOP OF RETRIEVING HEAD AT 2,649'. 13:00 - 14:30 1.50 DHB P DECOMP PRESSURE TEST 9-5/8"RBP. -PJSM,RIG UP TEST EQUIPMENT. -TEST AT 250 PSI LOW AND 3500 PSI HIGH 5 MINUTES EACH,TESTS GOOD. -POOH F/2,649'T/2,583'. -BLOW DOWN CHOKE AND KILL LINES. 14:30 - 16:30 2.00 DHB P DECOMP DUMP 2,200 LBS OF RIVER SAND DOWN DRILL PIPE. `FIRE DRILL. 16:30 17:30 1.00 DHB P DECOMP LINE UP TO CIRCULATE DOWN DP. -PJSM,CIRCULATE AT 1 BPM AT 40 PSI.TO ENSURE DP CLEAR. -FLOW CHECK FOR 10 MINUTES,WELL STATIC. -BLOW DOWN TOP DRIVE. 17:30 - 18:30 1.00 DHB P DECOMP PJSM,POOH F/2,583'T/16'STANDING BACK 4"DP IN DERRICK 18:30 - 19:00 0.50 DHB P DECOMP L/D HES RBP RUNNING TOOL. -SUCK OUT BOPE STACK -CLEAR AND CLEAN RIG FLOOR OF ALL TOOLS AND EQUIPMENT NOT NEEDED. 119.00 - 20:007 1.00 BOPSUR P DECOMP PJSM,REMOVE WEAR RING. -INSTALL TEST PLUG. -BREAK DOWN SAFETY JOINT. -PREPARE FOSVS FOR WEEKLY BOPE TEST. 20:00 - 22:00 2.00 BOPSUR P DECOMP PJSM,CHANGE OUT UPPER RAMS FROM 3-1/2"x 6"VARIABLES TO 9-5/8"FIXED RAMS. Printed 6/17/2013 9:27:06AM orth America-ALASKA BP/ Operation Summary Report Common Well Name:X-02 --- AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 1X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 BOPSUR P DECOMP PJSM,RIG UP TO TEST BOPE'S WITH 9-5/8" AND 4"TEST JOINTS. *OUTER ANNULUS REMAINS OPEN TO FLOWBACK TANK WITH CONTINUOUS MONITORING. *OPENED AT 18:00 HOURS ON 5-16-2013. *AOGCC JEFF JONES WAIVED WITNESS OF BOPE TEST. 5/19/2013 00:00 - 01:00 1.00 BOPSUR P DECOMP 'PJSM,RIG UP TO TEST BOPE W/9-5/8"AND 4" TEST JOINTS. 01:00 - 05:00 4.00 BOPSUR N SFAL DECOMP TEST BOPE IN ALLIANCE WITH DOYON SOP. -PERFORM WEEKLY TEST OF BOPE TO 250 PSI.LOWAND 3500 PSI.HIGH. -OBSERVED TEST PLUG LEAKING BY. -CONTACT CAMERON WELLHEAD REPRESENTATIVE TO MOBILIZE TO LOCATION. -MADE SEVERAL ATTEMPTS TO ENERGIZE SEAL ON TEST PLUG WITH NO SUCCESS. - -CAMERON WELLHEAD REPRESENTATIVE ARRIVED ON LOCATION AND INSPECTED " TEST PLUG. -SEAL LOOKED GOOD,BUT REPLACED SEAL AND RE-ATTEMPTED TO TEST AGAINST WITH NO SUCCESS. -TEST FLOOR VALVES AND TOP DRIVE VALVES WHILE CIW RETRIEVES ANOTHER TEST PLUG. -INSTALL SECOND TEST PLUG,RILDS AND CONTINUE BOPE TEST. 05:00 - 11:00 6.00 BOPSUR P DECOMP TEST BOPE. -TEST W/9-5/8"TEST JOINT WITH CHOKE MANIFOLD. -TEST TOP DRIVE VALVES,TEST(2)-4" FOSV'S,(1)-4"DART VALVE,(1)-5"FOSV. -TEST ANNULAR PREVENTER AND 3-1/2"x 6" VBR'S W/4"TEST JOINT. -PERFORM ACCUMULATOR DRAWDOWN TEST. -TEST GAS ALARMS. `JEFF JONES WAIVED WITNESS OF TEST. 11:00 - 12:00 1.00 BOPSUR P DECOMP R/D TEST EQUIPMENT. -PULL TEST PLUG. -BOLDS DRAIN STACK AND BLOW DOWN CHOKE AND KILL LINES. 12:00 - 16:30 4.50 BOPSUR P DECOMP N/D BOPE STACK -REVIEW DOYON SOP DURING PJSM. -PULL RISER,N/D STACK AND SET BACK ON STUMP. -R/D TUBING HEAD AND INSTALL 30" 13-5/8"5M X 13-5/8"5M SPACER SPOOL 16:30 - 21:00 4.50 BOPSUR P DECOMP N/U BOPE STACK -REVIEW DOYON PROCEDURE DURING PJSM. -INSTALL BOPE STACK TORQUE UP BOLTS. -OBTAIN NEW RKB'S.ATTACH TURN BUCKLES AND CLEAN CELLAR. -INSTALL RISER,FLOW LINE,BLEEDER AND HOLE FILL LINES. "SIM OPS-MOBILIZE BAKER 9-5/8"MULTI STRING CUTTER TO RIG FLOOR. Printed 6/17/2013 9:27:06AM { ,orth America-ALASKA Operation Summary Report _` Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 22:00 1.00 BOPSUR P DECOMP SHELL TEST BOPE. -PJSM,PRESSURE TEST ON CASING,BOPE BREAKS WITH BLIND SHEAR RAMS. -PRESSURE TEST 250 PSI LOW AND 2500 PSI HIGH FOR 5 MINUTES-TESTS GOOD. -BLEED OFF PRESSURE. 22:00 - 00:00 2.00 FISH P DECOMP PJSM,MAKE UP 8-1/4"MULTI-STRING CUTTER. -PICK UP AND MAKE UP BHA FOR CUTTING 9-5/8"CASING AS DIRECTED BY BAKER FISHING. 5/20/2013 00:00 - 01:30 1.50 FISH P DECOMP RIH WITH 8-1/4"MULTI-STRING CUTTER BHA ■ TO CUT 9-5/8"CASING FOR CASING PATCH. -RIH WITH 4"DP FROM DERRICK TO 2,476'. 01:30 - 02:30 1.00 FISH P DECOMP OBTAIN PARAMETERS. =M/U TOP DRIVE,SLACK OFF TO 2,539'. -102K PUW,105K SOW,1K FREE TORQUE AT 80 RPM'S. -OTAIN SLOW PUMP RATES. -BRING PUMPS ON AT 3.2 BPM WITH 200 PSI., SLACK OFF AND LOCATE 9-5/8"CASING COLLARS AT 2,567'AND 2,527'. -SHUT DOWN PUMPS AND PICK STRING UP TO 2,520',PUMP AT 3.2 BPM WITH 200 PSI., SLACK OFF AND LOCATE 9-5/8"CASING COLLAR AT 2,527'. -PICKUP 10' SPACE OUT PUP JOINT AND SPACE OUT TO CUT CASING AT 2,546'. -INSTALL GUAGE ON OA RO WATCH FOR ANY PRESSURE DURING CUT. 02:30 - 03:00 0.50 FISH P DECOMP CUT 9-5/8"CASING WITH 8-1/4"MULTI-STRING CUTTER. -START ROTATION OF TOP DRIVE AT 80 RPM'S,STAGE PUMP UP TO 250 PSI. OBSERVED 3K TORQUE INCREASE AND PUMP PRESSURE INCREASE TO 450 PSI., TORQUE STAYED STEADY AT 3K TO 4K WITH STRING WEIGHT OF 100K.AFTER 5 MINUTES OF CUTTING OBSERVED STRING WEIGHT BACK TO 105K,TORQUE DROPPED TOOK AND PUMP PRESSURE DECREASED TO 350 PSI.ROTATED FOR 3 MORE MINUTES WITH NO CHANGES.ALL INDICATORS FOR SUCCESSFUL CUT. -SHUT DOWN PUMP AND ROTARY,PICK UP FROM CUT 2'START PUMPS AT 2.5 BPM WITH 240 PSI.,SLACK OFF AND OBSERVE KNIFES GRAB CUT AT 2,546'. Printed 6/17/2013 9:27:06AM 4374‘7,-Y4.414%:,ow 1/.6W040 North America-ALASKA 13 y� Operation Summary Repo Common Well Name:X-02 ,AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-0OX7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:30 3.50 FISH P DECOMP DISPLACE ARCTIC PAK. -PJSM WITH LRS,CH2,MI SWACO AND DOYON RIG TEAM. -PT LRS LINES TO CEMENT LINE TO 250/3000 PSI. -OPEN UP AND PUMP 28 BBLS OF 80 DEGREE DIESEL DOWN DP AT 5 BPM WITH 850 PSI. PUMP PRESSURE. -CLOSE ANNULAR PREVENTER AND PUMP 23 BBLS OF 80 DEGREE DIESEL DOWN DP AT 1.2 BPM WITH ICP STARTING AT 239 PSI.AND AF=TER 10 BBLS AWAY PRESSURE DROPPED FROM 2500 PSI.TO 1500 PSI.INCREASED RATE TO 3 BPM WITH FCP AT 1481 PSI. -NO RETURNS OBSERVED FROM OA -LINE UP RIG PUMP AND PUMP 28 BBLS OF 130 DEGREE 9.8 BRINE DOWN DP AT 2 BPM, ICP AT 1250 PSI.AND FCP AT 830 PSI.BRINE IN PLACE AT 05:45. -NO RETURNS OBSERVED FROM OA. -LET SOAK FOR ONE HOUR. -PRESSURE BLED OFF TO ZERO. 1 06:30 - 07:30 1.00 FISH P DECOMP" LINE UP TO PUMP 9.8 PPG HEATED BRINE AT -2 RPM. -ICP=600 PSI,10 BBLS INTO CIRCULATION 600 PSI. -20 BBLS INTO CIRCULATION WITH 620 PSI. -SHUT DOWN PUMPS AT 28 BBLS FCP=610 PSI. -NO RETURNS OBSERVED FROM OA. 07:30 - 08:30 1.00 F151-1 ' P DECOMP CALL RWO ENGINEER IN TOWN TO DISCUSS PLAN FORWARD. 08:30 - 11:00 2.50 FISH P `, DECOMP RIG UP TO CIRCULATE AND BALANCE WELL BACK TO 8.5 PPG SEAWATER. -PJSM,CIRCULATE AT 3 BPM W/320 PSI,OA PRESSURE INCREASE FROM 25 PSI TO 300 PSI. -THEN DROPPED OFF TO ZERO,PRESSURE INCREASE BACK UP TO 50 PSI THEN BACK OFF TO ZERO. *PUMPED 190 BBLS WITH 170 BBLS BACK TO FLOW BACK TANK. 11:00 - 12:00 1.00 FISH P DECOMP BLOW DOWN CIRCULATING LINES. -LINE UP OA TO FLOW BACK TANK-NOTHING NOTICED. -SUCK OUT STACK AND BLOW DOWN CHOKE LINE. -FILL STACK AND MONITOR WELL FOR 10 MINUTES. 12:00 - 14:00 2.00 FISH P DECOMP PJSM,POOH W/8-1/4"MULTI-STRING CUTTER ASSY F/2,534'T/292'. -STANDING BACK 4"DP IN DERRICK. 14:00 - 14:30 0.50 FISH P DECOMP STAND BACK 3 STANDS OF 6-1/4"DRILL COLLARS. -UD STABILIZER AND 9-5/8"CSG CUTTER BHA. 14:30 - 15:30 1.00 FISH P DECOMP PJSM M/U 9-5/8"SPEAR ASSY.BHA. -RIH AND ENGAGE SPEAR INTO 9-5/8" CASING. 15:30 - 16:30 1.00 WHSUR P DECOMP CAMERON SERVICE REP,BACK OUT LOCK DOWN SCREWS. Printed 6/17/2013 9:27:06AM • �' � See�er� �� � i r Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) T Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To I Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:30 2.00 FISH P DECOMP ATTEMPT TO PULL 9-5/8 CSG. -PULL 275K ON CSG. -SHUT ANNULAR AND LINE UP TO PUMP 9.8 PPG BRINE TO FLOW BACK TANK. -CIRCULATE AT 860 PSI,PRESSURE STEADILY INCREASING AND STABILIZING AROUND 1,100 PSI T/1,300 PSI. -SMALL AMOUNT OF RETURNS TO FLOW BACK TANK NOTICED. -WEIGHT DROPPED FROM 275K WITH 0 PSI TO 245K W/1,130 PSI. -BLEED OFF RAPIDLY TO 0 PSI AND PRESSURE BACK UP TO 1,200 PSI A FEW TIMES. -SLACK OFF WEIGHT TO 55K AND PICK UP TO 275K AND HOLD. -START UP PUMPS AT 2BPM AND NOTICED IT BEGAN TO PACK OFF. -CONTINUE PUMPING AT 2 BPM WITH 9.8 BRINE,WHEN PRESSURE INCREASED TO 2,750 PSI WITH 22 BBLS AWAY OBSERVED INCREASED FLOW OF ARCTIC PACK BACK TO FLOW BACK TANK. PRESSURE DROPPED FROM 2,750 PSI TO 70 PSI AFTER 40 BBLS PUMPED AWAY. -CONTINUED PUMPING REMAINING BRINE. TOTAL OF 80 BBLS BRINE. -PUMPED 40 BBL DEEP CLEAN PILL INTO ANNULUS AND PUMPED AT 2 BPM THROUGH ANNULUS TO HELP CLEAN ARCTIC PAK. -SWAPPED TO SEAWATER AND CHASED DEEP CLEAN PILL OUT OF HOLE TO FLOWBACK TANK AT A RATE OF 5 BPM.WITH 500 PSI. "TOTAL CIRCULATED THROUGH 9-5/8"X 13-3/8"ANNULUS.50 BBLS DIESEL,290 BBLS. OF 9.8 BRINE&148 BBLS.OF SEAWATER. 18:30 - 21:00 2.50 FISH P DECOMP PUMP 40 BBLS OF 8.5 PPG DEEP CLEAN SWEEP AT 2 BPM.WITH 90 PSI FOLLOWED BY 8.5 PPG SEAWATER. -INCREASED PUMP RATE TO 5 BPM WITH 430 PSI. -STRING WEIGHT 190K,CIRCULATED 412 BBLS. -FCP AFTER WAS 430 PSI. -10 MINUTE FLOW CHECK-WELL STATIC. -OPEN ANNULAR. 21:00 - 22:30 1.50 BOPSUR P DECOMP PJSM,N/D BOPE STACK. -BLOW DOWN LINES AND FLUSH STACK I WITH WATER. -SUCK IN FLOW LINER AND DROP RISER. -BREAK BOPE BOLTS ON TOP CSG HEAD AND P/U BOPE STACK. 22:30 - 00:00 1.50 WHSUR P DECOMP CAMERON SERVICE REP WORKING ON FREEING SLIPS. -PICK UP 9-5/8"CASING TO 275K. -REMOVE PACK-OFF ASSEMBLY FROM ABOVE SLIPS. Printed 6/17/2013 9:27:06AM North America-ALASKA B r � ``# %;operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12.00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/21/2013 00:00 - 07:00 7.00 WHSUR P DECOMP CAMERON REP RETRIEVAL OF EMERGENCY SLIP ASSEMBLY FROM CASING HEAD. -REMOVE ONE HALF OF PACK-OFF ASSEMBLY FROM TOP OF SLIPS. -ALLEN BOLT HEAD SPLIT ON SECOND HALF OF PACK-OFF ASSEMBLY. -SLACK STRING WEIGHT BACK TO NEUTRAL AT 175K. -COME UP IN 25K INCREMENTS TO 275K. NO MOVEMENT NOTICED -SLACK BACK DOWN TO 175K AND CHAIN DOWN THE BRAKE. -SNIFF AND FILL OUT HOT WORK PERMIT TO DRILL OUT LAST BOLT IN PACK-OFF ASSEMBLY. -DRILLED OUT LAST ALLEN HEAD BOLT AND WORKED REMAINING HALF OF PACK-OFF ASSEMBLY FREE. -PULL SPEAR ASSY AND 9-5/8"TO 275K. -ATTEMPT TO PULL SLIPS FREE FROM PROFILE. -NO SUCCESS IN PULLING SLIPS FREE. 07:00 - 08:00 1.00 WHSUR P DECOMP TDISCUSSED PLAN FORWARD WITH RWO f ENGINEER IN TOWN. 08:00 - 09:30 1.50 BOPSUR P DECOMP PJSM,NU BOPE'S. -ATTACH TURN BUCKLES,ADJUST RISER. -INSTALL FLOW,BLEED OFF AND HOLE FILL LINES AND INSTALL COVERS. 09:30 - 10:00 0.50 FISH v P DECOMP DISENGAGE SPEAR AND UD 9-5/8"SPEAR ASSY. 10:00 - 11:00 1.00 FISH P DECOMP PJSM,MOBILIZE AND M/U BHA ON RIG FLOOR. -P/U AND ASSEMBLE 8-1/4"MULTI STRING CUTTER BHA. -RIH WITH 6-1/4"DRILL COLLARS F/11'T/290' 11:00 - 11:30 0.50 FISH P DECOMP RIH WITH 8-1/4"MULTI STRING CUTTER BHA TO CUT 9-5/8"CSG. -RIH WITH A STAND OF 4"DP FROM DERRICK F/290'T/384'. -MAKE UP TOP DRIVE ON STAND#2 FROM DERRICK. -OBTAIN PARAMETERS. 11:30 - 12:30 1.00 FISH P DECOMP CUTTING OPERATIONS. -RIH AND LOCATE COLLAR AT 402'. -REPOSTION CUTTER AT 386'AND MAKE CUT. -ROTARY AT 80 RPM W/1K TORQUE, CIRCULATE 4 BPM WITH 350 PSI. -INCREASE PUMP TO 5 BPM W/510 PSI, INCREASE PUMP RATE TO 6 BPM W 690 PSI AND PRESSURE DROPPPED OFF TO 600 PSI. INDICATING CSG CUT. -PUMPS OFF,PULL UP 1'AND SLACK OFF, NOTICED CUTTERS TOOK WEIGHT. 12:30 - 13:00 0.50 FISH P DECOMP SHUT IN ANNULAR PREVENTER AND CIRCULATE OUT TO FLOW BACK TANK. -CIRCULATE 75 BBLS OF SEAWATER AT 4 BPM W/350 PSI. `FIRE DRILL HELD. -FLOW CHECK-WELL STATIC. Printed 6/17/2013 9:27:06AM ° North America-ALASKA B O eration summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 14:00 1.00 FISH P DECOMP PJSM,POOH SBDP F/386'TO 11'. -RACK BACK 3 STANDS OF 6-1/4"DRILL COLLARS. -LAY DOWN 8-1/4"MULTI STRING CUTTER BHA USED TO CUT 9-5/8"CSG. 14:00 - 15:00 1.00 FISH P DECOMP PJSM,M/U 9-5/8"SPEAR ASSY BHA W/2 JOINTS OF DP. 1-RIH AND ENGAGE SPEAR AT 33'W/10'OF SWALLOW ON SPEAR. 15:00 - 16:00 1.00 BOPSUR P DECOMP PJSM,N/D BOPE STACK -BLOW DOWN LINES AND LIFT BACK ONTO STUMP AND SECURE. 16:00 - 16:30 j 0.50 WHSUR P DECOMP CAMERON REP RETRIEVAL OF EMERGENCY SLIP ASSEMBLY FROM CASING HEAD. -PULL ON 9-5/8"CSG W/75K MOVEMENT NOTICED. -REMOVE CSG SLIPS FROM CSG.HEAD PROFILE. 16:30 - 17:30 1.00 BOPSUB P DECOMP PJSM,N/U BOPE STACK. -INSTALL RISER AND FLOW LINE. I-ATTACH TURN BUCKLES TO STACK 17:30 - 18:00 0.50 FISH P DECOMP PJSM,CIRCULATE BACK TO FLOW BACK - [TANK. -SHUT IN ANNULAR AND CIRCULATE OUT. -CIRCULATE AT 6 BPM W/200 PSI TOTAL OF 75 BBLS OUT TO FLOW BACK TANK -FLOW CHECK-WELL STATIC. -OPEN ANNULAR. 18:00 00:00 6.00 FI H P DECOMP PJSM,PULL 9-5/8 CSG TO RIG FLOOR S -LAY DOWN 1 JOINT OF 4"DP LEAVING DP ACROSS STACK DURING RIG UP OF CSG. EQUIP. -MOBILIZE AND R/U ULTRA HIGH TORQUE POWER TONGS ON RIG FLOOR. -LAY DOWN LAST JOINT OF 4"DP. -LAY DOWN TOP CUT JOINT OF 9-5/8"CSG. WITH SPEAR TO PIPE SHED. -PULL 9-5/8"CSG. -L/D 8 FULL JOINTS AND 2 CUT JOINTS OF 9-5/8"CSG. -TOTAL LENGTH OF 9-5/8"CSG.LAYED DOWN-354'. -CUT JOINTS LENGTH AT 22.77'(TOP JOINT) AND 26.23'(BOTTOM JOINT THAT WAS CUT). •BREAK OUT TORQUE ON CSG BETWEEN 45K AND 52K. 5/22/2013 00:00 - 01:00 1.00 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR FROM ARCTIC PAK. -SET ASIDE CSG.TOOLS. 01:00 - 01:30 0.50 FISH P DECOMP PJSM,P/U SPEAR AND TOP CUT JOINT OF 9-5/8"CASING FROM PIPE SHED. -REMOVE SPEAR AND L/D CUT JOINT. 01:30 - 03:00 1.50 FISH P DECOMP MAKE UP SPEAR ASSEMBLY TO RETRIEVE REMAINING 9-5/8"CSG. -MAKE UP SPEAR ASSEMBLY WITH JARS AND BUMPER SUB. -RIH WITH 6-1/4"DRILL COLLARS FROM DERRICK TO 312'. -PICK UP INTENSIFIER AND RIH T/325' *SAFETY JOINT READY IN PIPE SKATE WITH PROPER CROSSOVER FOR DRILL COLLARS. Printed 6/17/2013 9:27:06AM • North America-ALASKA BP Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12.00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 03:30 0.50 FISH P DECOMP MAKE UP TOP DRIVE AND ENGAGE 9-5/8" CSG.AT 387' -MAKE UP TOP DRIVE TO STAND OF DP AND OBTAIN PARAMETERS. -SOW=74K,PUW=72K. -LOCATE TOP OF 9-5/8"CSG.AT 387' SWALLOW SPEAR ASSEMBLY TO STOP SUB AT 398'. 03:30 - 04:00 0.50 FISH P DECOMP JAR ON 9-5/8"CSG.AS DIRECTED FROM BAKER FISHING. -HIT JARS WITH 225K PULLED INTO FISH AND PULL UP TO 250K TO 275K WITH NO MOVEMENT OBSERVED. I-JARRED ON FISH 8 TIMES AND TURNED PUMPS ON PUMPING FROM 2 BPM WITH 50 PSI.AND INCREASING TO 5 BPM WITH 200 PSI. -AFTER 10 BBLS PUMPED HOLE FILLED UP. -HIT JARS WITH 225K UP WEIGHT PULLED AND AFTER JARS HIT PULLED INTO TO 250K TO 300K 8 MORE TIMES. - -AFTER 83 BBLS.RETURNED OBSERVED ARCTIC PAK AT SURFACE IN FLOW RISER. -SHUT DOWN PUMPS AND GATHERED FOR PJSM ON ARCTIC PAK DISPACEMENT TO FLOWBACK TANK. -PULL INTO 9-5/8"CSG.FISH TO 300K AND CHAINED OFF BRAKE. 04:00 07:00 3.00 FISI-1 P DECOMP DISPLACE ARCTIC PAK. -PJSM AND SPOT VAC TRUCKS WITH HEATED BRINE AND HEATED SEAWATER TO RIG. -LINE UP THROUGH OUTER ANNULUS TO FLOWBACK TANK. -SHUT ANNULAR PREVENTER. -PUMP 290 BBLS.OF HEATED 9.8 BRINE AT 7 BPM WITH 350 TO 450 PSI.AFTER 200 BBLS AWAY PSI INCREASED TO 500 PSI. -UNABLE TO OBTAIN HIGHER RATE DUE TO HOLE IN 13-3/8 BREACHING FLUIDS INTO CELLAR WHEN PUMPING ATA HIGHER RATE. -PUMP 30 BBL.DEEP CLEAN PILL AT 5 BPM WITH 300 PSI. -PUMP 340 BBLS.OF HEATED SEAWATER TO CHASE DEEP CLEAN OUT OF HOLE AT 7 TO 9 BPM WITH 600 PSI.TO 1250 PSI. -AFTER 100 BBLS OF HEATED SEAWATER WAS PUMPED PRESSURE DROPPED FROM 1240 PSI.TO 520 PSI.AND MAINTAINED AT 500 TO 600 PSI.FOR REMAINDER OF DISPLACEMENT AT 9 BPM. -FLOW CHECK-WELL STATIC. -OPEN ANNULAR PREVENTER. 'TOTAL OF 660 BBLS PUMPED THROUGH 9-5/8"X 13-3/8"ANNULUS FOR THIS DISPLACEMENT. 07:00 - 09:00 2.00 FISH P DECOMP INSPECT TOP DRIVE,DERRICKS AND BLOCKS FOLLOWING DOYON SOP ON JARRING OPERATIONS. Printed 6/17/2013 9:27:06AM • North America-ALASKA BP, ,, % Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 1 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:OOAM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:30 1.50 FISH P DECOMP JAR ON 9-5/8"CSG.AS DIRECTED FROM BAKER FISHING. -JAR CSG AT 250K,AFTER JARS HIT PULLED UP TO 350K. -REPEATED OPERATION 35 TIMES. -TURNED PUMPS ON AT 6 BPM W/210 PSI. -ARCTIC PAK RETURNS SEEN AT SURFACE. !-SHUT DOWN PUMP. 10:30 - 12:30 2.00 FISH P DECOMP PJSM,FLUSH STACK PUMPING THROUGH KILL LINE TO CLEAN ARCTIC PAK FROM ANNULAR PREVENTER. -CLOSE ANNULAR PREVENTER AND LINE UP TO FLOW BACK TANK. -BRING PUMP UP TO 7 BPM AT 360 PSI. -RECEIVED RETURNS TO FLOW BACK TANKS AT 1.9 BBLS. -PUMPS OFF. -SHUT IN OUTER ANNULUS VALVE. -BLOW DOWN HARD LINE TO FLOW BACK TANK. *175 BBLS PUMPED WITH CLEAN RETURNS. - c *O PSI UNDER ANNULAR. 12.30 - 14:30 2.00 FISH P DECOMP SHUT DOWN FOR MEETING WITH GWO AREA VICE PRESIDENT,AK.VICE PRESIDENT OF WELLS,FIELD SUPERINTENDANT AND RIG _ TEAM IN DOGHOUSE ON RIG FLOOR. 14:30 - 15:30 i 1.00 FISH P DECOMP PJSM,INSPECT DERRICK,TOP DRIVE AND BLOCKS FROM JARRING OPERATIONS. -POST JARRING INSPECTION FOLLOWING DOYON SOP. -VERIFY NO PRESSURE UNDER ANNULAR PREVENTER. -OPEN ANNULAR PREVENTER. 15:30 - 16:30 1.00 FISH P DECOMP JAR ON 9-5/8"CSG.AS DIRECTED FROM BAKER FISHING. -SET JARS OFF AT 274K THEN PULL TO 350K. -HIT JARS 8 MORE TIMES,9-5/8"CSG PULLED FREE AT 360K. -PULLED UP 63'AND CIRCULATED BOTTOMS UP. *TOTAL 311 BBLS CIRCULATED AT 8 BPM W/ 540 PSI.OF HEATED SEAWATER. 16:30 - 18:00 1.50 FISH P DECOMP PJSM,PULL 9-5/8"CSG OUT OF THE HOLE. -RACK BACK 1 STAND OF DRILL PIPE. -BLOW DOWN TOP DRIVE AND RACK BACK 2 STANDS OF 6-1/4"DRILL COLLARS. -BEGIN PULLING CSG,DRAG FROM 250K,TO 317K. -LINE UP TO CIRCULATE DOWN LAST STAND OF DRILL COLLAR WITH CROSSOVER MADE UP TO TOP DRIVE.. Printed 6/17/2013 9:27.06AM North America-ALASKA BE ,� , Operation Summary Report; �'�� a Common Well Name.X-02 1 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 'X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor DOYON DRILLING INC. I UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs I Task 1 Code ! NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:30 2.50 FISH P DECOMP POOH AND STAND BACK LAST STAND OF 6-1/4"DRILL COLLARS. I-STAGE PUMP UP TO 5 BPM WITH 420 PSI. AND OBSERVED WEIGHT COME DOWN BUT NO RETURNS OBSERVED. -INCREASE RATE TO 8 BPM WITH 700 PSI.TO TRY AND BREAK ARCTIC PAK FROM BEHIND 9-5/8"CSG.WITH A TRICKLE OF RETURNS OBSERVED AT FLOW LINE.SHUT DOWN ''PUMPS,BREAK OUT CROSSOVER AND BLOW DOWN TOP DRIVE. -POOH WITH BUMPER SUB AND JARS WITH 1 DRAG OF 245K TO 325K. 1-POST JARRING DERRICK,TOP DRIVE AND ' 'BLOCK INSPECTION. *TOTAL OF 94 BBLS.PUMPED AWAY. NO RETURNS OBSERVED IN CELLAR OR I SURROUNDING WELL CELLARS. 20:30 - 23:00 2.50 FISH ` P, DECOMP 1PJSM,PULLAND"L/D 9-5/8"CSG W/14"ULTRA HIGH TORQUE TONGS. -L/D CUT JOINT WITH SPEAR ENGAGED.( LENGTH OF CUT JOINT IS 15.55') -MOBILIZE 350 TON ELEVATORS FOR PULLING 9-5/8"CSG.TO RIG FLOOR AND RIG UP. -RIG UP SINGLE JOINT ELEVATORS FOR 9-5/8"CSG. 23:00 - 00:00 1.00 FISH P DECOMP POOH W/9-5/8"47#L-80 BUTTRESS CSG. -LAY DOWN 9-5/8"CSG F/2,143'T/1,900'. _ -PUW=256K TO 350K. I "BREAK OUT TORQUE 55 TO 60K FT/LBS. 5/23/2013 1 00:00 - 02:30 2.50 FISH -„ P DECOMP ATTEMPT TO BREAK DOWN ARCTIC PAK FROM BEHIND 9-5/8"CSG. I I-PJSM,RIG UP TO REVERSE DOWN KILL LINE TAKING RETURNS THROUGH 9-5/8"CSG.TO I FLOWBACK TANK. -CLOSE ANNULAR PREVENTER. -PUMP AT.5 BPM WITH 720 PSI.WITH NO I RETURNS OBSERVED TO 9-5/8"AFTER 10 BBLS PUMPED OBSERVED CELLAR I BREACHING FLUID.SHUT DOWN PUMPS AND I LINED UP TO PUMP DOWN 9-5/8"CSG. i TAKING RETURNS TO PITS. -VERIFY NO PRESSURE ON WELLAND OPEN ANNULAR PREVENTER. !-PUMP DOWN 9-5/8"CSG.AT 4 BPM WITH I I PRESSURE BUILD UP TO 1180 PSI.WITH 18 1 1 BBLS PUMPED AND PRESSURE BROKE DOWN TO 520 PSI.,INCREASED PUMP RATE TO 6 BPM WITH 670 PSI.THEN INCREASED TO 7 BPM WITH 760 PSI.AND NO RETURNS OBSERVED.SHUT DOWN PUMPS AND BLOW DOWN PUMP LINES. WHEN PUMPING DOWN 9-5/8"CSG.NO BREACHING OF CELLAR AND SURROUNDING I WELL CELLARS OBSERVED. 02:30 - 03:30 1.00 FISH P I DECOMP POOH W/9-5/8"47#L-80 BUTTRESS CSG. -LAY DOWN 9-5/8"CSG F/1,900'T/1,540'. 1 -PUW=275K TO 325K. 'BREAK OUT TORQUE 55 TO 65K FT/LBS. Printed 6/17/2013 9:27:06AM North America-ALASKA BP ,;Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 05:00 1.50 FISH N SFAL 1,540.00 DECOMP REPAIR 14"ULTRA HIGH TORQUE TONGS. -OBSERVED THREE MACHINE SCREWS IN UNDER SIDE OF INTEGRAL BACK UPS SHEARED OFF FROM BREAKING OUT 9-5/8" CSG.WITH 65K FT/LBS. -TAP OUT AND REPLACE SHEARED MACHINE SCREWS. 05:00 - 12:00 7.00 FISH P DECOMP POOH W/9-5/8"47#L-80 BUTTRESS CSG. -STEAM HEAT CONNECTIONS TO WARM UP FOR BREAKING OUT WITH HYDRAULIC TONGS. -LAY DOWN 9-5/8"CSG F/1,540'T/325". -PUW=27SK TO 325K. *CEMENT NOTICED ON JOINT#37 PULLED FROM WELL ON COUPLING. 1*55 JOINT L/D AND 1 CUT JOINT,5 CENTRALIZERS RECOVERED. *TOTAL OF 64 COMPLETE JOINTS AND 4 CUT JOINTS OF 9-5/8"CSG.ALONG WITH 5 CENTALIZERS RECOVERED FROM WELL. *BREAK OUT TORQUE 55 TO 65K FT/LBS. *NO ABNORMALITIES OBSERVED FROM 9-5/8" CSG PULLED FROM WELL. *FLUID LOSSES FOR TOUR-76 BBLS. 12:00 - 13:00 1.10 FISH P DECOMP PJSM,RIG DOWN CSG EQUIPMENT. -CLEAN ULTRA HIGH TORQUE TONGS,RIG DOWN AND MOVE ASIDE ON FLOOR. -RIG DOWN 350 TON ELEVATORS W/SINGLE JOINT ELEVATORS,CLEAN AND REMOVE FROM FLOOR. 13:00 - 13:30 0.50 FISH P DECOMP FLUSH BOPE STACK -CIRCULATE 9 BPM W/30 PSI AND 90 RPM W/ O PSI TORQUE. -CLEAN SURFACE EQUIPMENT IN THE PITS AND ROCK WASHER. 13:30 - 17:00 3.50 FISH P DECOMP CLEAN AND CLEAR DRIP PAN UNDER RIG FLOOR FROM ARCTIC PAK AND CEMENT. *SIM OPS CHANGE OUT SWAB ON#2 MUD PUMP. 17:00 - 17:30 0.50 FISH P DECOMP PICKUP CSG JOINT WITH SPEAR ENGAGED. -ATTEMPT TO BREAK OUT SPEAR,NO MOVEMENT. -L/D SPEAR W/CUT CASING. 17:30 - 19:30 2.00 FISH P DECOMP PJSM,SLIP AND CUT DRILLING LINE. -SERVICE DRAW WORKS,BLOCKS,CROWN AND TOP DRIVE. *TOTAL 59'DRILL LINE CUT. 19:30 - 23:00 3.50 FISH P DECOMP PJSM,P/U&M/U 13-3/8"SCRAPER WITH DRESS OFF ASSEMBLY TO DRESS 9-5/8" STUB AT 2,546'. -BEAVER SLIDE OPERATIONS. -BRING IN TOOLS NEEDED FOR DRESS OFF ASSEMBLY. -ASSEMBLE SCRAPER WITH DRESS OFF ASSEMBLY. -RIH W/3 STANDS OF 6-1/4"DRILL COLLARS FROM DERRICK TO 326' 23:00 - 23:30 0.50 FISH P -_ DECOMP PJSM,RIH W/4"DP FROM DERRICK F/326'T/ 670'. Printed 6/17/2013 9:27:06AM x r North America-ALASKA BPS' zip Operation Summary Report Common Well Name:X-02 I AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.1ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) —_ 23:30 - 00:00 0.50 FISH P DECOMP REAM THROUGH CEMENT STRINGER F/670' T/690'. -MAKE UP TOP DRIVE AND OBTAIN PARAMETERS. -PICK UP WEIGHT 77K,SLACK OFF WEIGHT 77K,ROTATING WEIGHT 80K AT 30 RPM W/1K TORQUE. --25K WEIGHT ON MILL. -LINE UP AND CIRCULATE AND REAM DOWN AT 30 RPM'S WITH NO TORQUE OBSERVED. -CIRCULATE AT 4 BBLS PER MINUTE W/80 PSI. *TOTAL 280 BBLS PUMPED,FINE CEMENT AND MINIMUM ARCTIC PAK SEEN IN RETURNS. *TOTAL FLUID LOSSES FOR TOUR 20 BBLS. *TOTAL FLUID LOSSES FOR 24 HOURS 96 BBLS. 5/24/2013 00:00 - 00:30 0.50 FISH P ' DECOMP RIFK W/ 13-3/8"SCRAPER WITH DRESS OFF 1 ASSEMBLY TO DRESS 9-5/8"STUB AT 2,546'. -REAM THROUGH CEMENT STRINGER F/690' T/700'. -CIRCULATE AT 9 BBLS PER MINUTE W/290 -PSI. -ROTATE AT 50 RPM W/1K TORQUE. 00:30 - 01:00 FISH ' P DECOMP RIH W/ 13-3/8"SCRAPER WITH DRESS OFF ASSEMBLY TO DRESS 9-5/8"STUB AT 2,546'. -RIH ON ELEVATORS WITH 4"DP FROM DERRICK F/700'T/1,087'. 01:00 - 01:30 0.50 FISH P DECOMP REAM FROM 1,087'TO 1,181'WITH 13-3/8" SCRAPER/DRESS OFF ASSEMBLY. -MAKE UP TOP DRIVE AT 1,087'CIRCULATE BOTTOMS UP WHILE REAMING STAND DOWN TO CLEAN HOLE. -CIRCULATE AT 8 BPM WITH 240 PSI.WHILE ROTATING AT 50 RPM'S WITH 3K TORQUE RUNNING 5 TO 10K WOB. *FINE CUTTINGS OF CEMENT AND ARCTIC PAK OBSERVED AT SHAKER. 01:30 - 02:00 0.50 FISH P DECOMP RIH W/ 13-3/8"SCRAPER WITH DRESS OFF ASSEMBLY TO DRESS 9-5/8"STUB AT 2,546'. -RIH ON ELEVATORS WITH 4"DP FROM DERRICK F/1,087'T/1,688'. 02:00 - 02:30 0.50 FISH P DECOMP REAM FROM 1,688'TO 1,751'WITH 13-3/8" SCRAPER/DRESS OFF ASSEMBLY. -MAKE UP TOP DRIVE AT 1,688'CIRCULATE BOTTOMS UP WHILE REAMING STAND DOWN TO CLEAN HOLE. -CIRCULATE AT 8 BPM WITH 260 PSI.WHILE ROTATING AT 50 RPM'S WITH 3K TORQUE RUNNING 5 TO 10K WOB. *FINE CUTTINGS OF CEMENT AND ARCTIC PAK OBSERVED AT SHAKER. 02:30 - 03:00 0.50 FISH P DECOMP RIH W/ 13-3/8"SCRAPER WITH DRESS OFF ASSEMBLY TO DRESS 9-5/8"STUB AT 2,546'. -RIH ON ELEVATORS WITH 4"DP FROM DERRICK F/1,751'T/2,350'. -TAG CEMENT STRINGER AT 2,350'PLACING SCRAPER DEPTH AT 2,330'. -WEIGHT ON SCRAPER WAS 25K. -PICK STRING BACK UP TO 2,320'. Printed 6/17/2013 9:27:06AM • North America-ALASKA-BP s3 # ';. Operation Summary Report F` { Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:30 3.50 FISH P DECOMP REAM FROM 2,320'TO 2,469'WITH 13-3/8" !SCRAPER/DRESS OFF ASSEMBLY. -MAKE UP TOP DRIVE AT 2,320'CIRCULATE BOTTOMS UP WHILE REAMING STAND DOWN TO CLEAN HOLE. -CIRCULATE AT 8 BPM WITH 320 TO 350 PSI. WHILE ROTATING AT 50 RPM'S WITH 3 TO 5K TORQUE RUNNING 5 TO 10K WOB. *REAMING THROUGH CEMENT. *FINE CUTTINGS OF CEMENT AND ARCTIC L PAK OBSERVED AT SHAKER. 06:30 - 09:00 2.50 FISH P DECOMP CIRCULATE HOLE CLEAN. -ROTATE AND RECIPROCATE WHILE PUMPING DEEP CLEAN AND FLO VAN HIGH-VIS SWEEPS SURFACE TO SURFACE. -PUMP AT 8 BPM WITH 320 PSI.WHILE • ROTATING AT 30 RPM'S WITH 0 TO 3K TORQUE. "CIRCULATE TOTAL OF 780 BBLS. 09:00 - 09:30 0.50 FISH P DECOMP MONITOR WELL-STATIC. -BLOW DOWN TOP DRIVE. 09:30 - 10:00 0.50 FISH P DECOMP PJSM,POOH WITH 13-3/8 SCRAPER WITH DRESS OFF ASSEMBLY TO DRESS 9-5/8" —STUB. -POOH STANDING BACK 4"DP F/2,469'T/ 2,321'. -PULLING TIGHT AND SWABBING WELL. PULLED 60K OVER AT 160K.WHEN REACHING 2,321'. 10:00 - 13:30 3.50 FISH_ P DECOMP PJSM,LINE UP TO PUMP. -MAKE UP TOP DRIVE. -CIRCULATE BOTTOMS UP WHILE ROTATING AND RECOPROCATING UNTIL RETURNS CLEANED UP. -PUMP AT 8 BPM W/230 PSI,THEN 15 BPM AT 850 PSI WHILE ROTATING AT 30 RPM.WITH 0 TO 3K TORQUE. -MONITOR WELL FOR 10 MINUTES-STATIC -BLOW DOWN TOP DRIVE. "CIRCULATE TOTAL OF 1,637 BBLS. *LARGE AMOUNT OF FINE CUTTINGS OF CEMENT AND ARCTIC PAK OBSERVED AT SHAKER. *MIX HIGH VIS SWEEPS. "LOSSES FOR 12 HOUR TOUR 30 BBLS. 13:30 - 14:30 1.00 FISH P DECOMP PJSM,POOH SBDP F/2,321'T/421'. -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING NON SHEARABLES THROUGH STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DP IN DERRICK. 14:30 - 16:00 1.50 FISH P DECOMP STAND BACK 3 STANDS OF 6-1/4"DRILL COLLARS IN DERRICK. -UD 13-3/8"CSG SCRAPER,BOOT BASKET AND 9-5/8"DRESS OFF ASSEMBLY. -5 GALLONS CLEANED OUT OF BOOT BASKET. 16:00 - 18:30 2.50 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR OF BAKER TOOLS AND 14"ULTRA HIGH TORQUE TONGS. -BRING BAKER TOOLS UP TO RIG FLOOR FOR 12-1/4"BIT BHA. Printed 6/17/2013 9:27:06AM • ,,,,,,North America-ALASKA BP „ , Operation Summary Report'.'> Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UW: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 20:00 1.50 FISH P DECOMP PJSM,MAKE UP 12-1/4"MILL TOOTH BIT BHA. -M/U BOOTS BASKETS AND 12-1/4 ROLLER CONE BIT. -RIH WITH 6-1/4"DRILL COLLARS T/324'. 20:00 - 21:00 1.00 FISH P DECOMP PJSM,RIH WITH 12-1/4"BIT ASSEMBLY TO CLEAN CEMENT FROM 13-3/8"CSG. -RIH F/324'T/2,404'WITH 4"DP FROM DERRICK. 21:00 - 22:30 1.50 FISH P DECOMP 1 PJSM,CLEAN OUT CEMENT WITH 12-1/4"BIT BHA FROM 13-3/8"CSG.TO TOP OF 9-5/8" C$G.STUB. -MAKE UP TOP DRIVE AT 2,404'. -OBTAIN PARAMETERS. -PUW=101 K,SOW 105K. -TAG CEMENT IN 13-3/8"CSG.WITH 12-1/4" BIT AT 2,478' -CIRCULATE BOTTOMS UP AT 5.5 BBLS PER MINUTE W/130 PSI,70 RPM AND 1K TORQUE. -VIS UP ENTIRE SYSTEM TO 55 VIS WITH 8.5 SNV UNTIL IN AND OUT PROPERTIES ARE THE SAME. OBTAIN SPR'S AT 2,465'. 22:30 - 00:00 1.50 FISH P - DECOMP REAM DOWN CLEANING OUT CEMENT FROM 13-3/8"CASING F/2,478'TO TOP OF 9-5/8" STUB AT 2,546'. -W/70 RPM AND 1K TORQUE. WEIGHT ON BIT=O TO 1K.,PUMP AT 6 BPM W/150 PSI. -REAM DOWN TO 2,546'. -CIRCULATE BOTTOMS UP AT 6 BPM W/190 PSI.WHILE ROTATING AT 70 RPM'S WITH 1K TORQUE. *TAG 9-5/8"CUT OFF STUB AT 2,546'. *0 BBL MUD LOSSES FOR 12 HOUR TOUR. *30 BBLS LOSSES FOR LAST 24 HOURS. • 5/25/2013 00:00 - 02:00 2.00 FISH P DECOMP CIRCULATE HOLE CLEAN. -CIRCULATE AT 6 BPM W/200 PSI AT 70 RPM AND 1K FREE TORQUE. -PUMP 20 BBL DRY JOB AT 5 BPM WITH 100 PSI. -MONITOR WELL FOR TEN MINUTES-WELL STATIC. *TOTAL OF 1050 BBLS PUMPED TO REAM DOWN AND CIRCULATE CLEAN. 02:00 - 03:00 1.00 FISH P DECOMP POOH W/12-1/4"BIT BHA USED FOR CLEANING CEMENT FROM 13-3/8"CSG. DOWN TO 9-5/8"STUB AT 2,546' -BREAK OUT TOP DRIVE AND BLOW DOWN SAME. -POOH STANDING BACK4"DP IN DERRICK F/ 2,546'T/410'. -MONITOR WELL BEFORE PULLING NON SHEARABLES THROUGH STACK *SAFETY JOINT READY IN PIPE SKATE WITH CROSSOVER FOR DRILL COLLARS. ' I Printed 6/17/2013 9:27:06AM North America-ALASKA BP y re Operation Summary Report: Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 03:30 0.50 FISH P DECOMP PULL 12-1/4"BIT BHA USED FOR CLEANING CEMENT FROM 13-3/8"CSG.DOWN TO 9-5/8" STUB. -STAND BACK LAST STAND OF 4"DP IN DERRICK F/410'T/315'. -STAND BACK 3 STANDS OF 6-1/4"DRILL COLLARS F/315'T/39'. -CLOSE BLIND/SHEAR RAMS. -BREAK OUT AND LAY DOWN 12-1/4"BIT BHA. 03:30 - 04:30 1.00 FISH P DECOMP CLEAN OUT BOOT BASKETS AND REMOVE 12-1/4"BIT BHA COMPONENTS FROM RIG FLOOR. -PJSM ON HANDLING BOOT BASKETS AND REVIEW DOYON SOP ON BEAVER SLIDE 'OPERATIONS. -SEND OUT BIT BHA COMPONENTS AND PICK UP DRESS OFF BHA COMPONENTS NEEDED THROUGH BEAVER SLIDE. -10 GALLONS OF CEMENT CLEANED OUT OF BOOT BASKETS. 04:30 - 07:00 2.50 FISH P DECOMP PICKUP AND MAKE UP 9-5/8"DRESS OFF BHA FOR PREPPING 9-5/8"STUB FOR CASING PATCH ASSEMBLY. -PICK UP JARS AND BUMPER SUB FROM PIPE SHED AND BUILD INNER MILL ASSEMBLY WITH WASH PIPE EXTENSION AND GUIDE SHOE. -OPEN CHOKE AND VERIFY 0 PSI. -OPEN BLIND/SHEAR RAMS. -PJSM,DRAIN STACK AND BLOW DOWN CHOKE AND HOLE FILL LINES. -RIH W/6-1/4"DRILL COLLARS FROM DERRICK TO 323'. 07:00 - 08:00 1.00 FISH P DECOMP PJSM,RIH W/4"DP FROM DERRICK. -CHANGE OUT ELEVATORS FROM 4-1/2"TO 4" ELEVATORS. -RIH W/4"DP F/321'T/2,506' -OBTAIN SLOW PUMP RATES -OBTAIN PARAMETERS -PUW=105K,SOW=107K,ROT WT=106K AT 60 RPM WITH 1K TORQUE OFF. *TAGGED UP AT 2,538'. 08:00 - 09:00 1.00 FISH P DECOMP MILL OUT CEMENT TO TOP OF 9-5/8"CSG STUMP. -MILL DOWN TO TOP OF STUMP AT 2,546'. -MILL DOWN TO 2,549'. -PUMP AT 8 BPM WITH 300 PSI.,55 TO 65 RPM'S WITH 2 TO 15K TORQUE. *466 BBLS CIRCULATED. 09:00 - 11:00 2.00 FISH P DECOMP CIRCULATE WELL CLEAN OF ALL DEBRIS. -PUMP HIGH VIS SWEEP WHILE OVER STUMP. *METAL PIG TAILS NOTICED ON MAGNETS IN FLOW DITCH. -CIRCULATE AT 11 BPM W/480 PSI AND 12 BPM W/550 PSI,UNTIL NO METAL CUTTINGS OBSERVED AT SURFACE. *1690 BBLS CIRCULATED. Printed 6/17/2013 9:27:06AM North America-ALASKA B 2. Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12.00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00(4)74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 13:00 2.00 FISH P DECOMP PJSM,DISPLACE WELL BACK TO 8.5 PPG SEAWATER. -CLOSE ANNULAR PREVENTER AND LINE UP TO FLOWBACK TANK -RECEIVED RETURNS RIGHT AWAY AT START OF DISPLACEMENT. -PUMP 3 BPM W/130 PSI,4 BPM W/180 PSI,5 BPM W/250 PSI,6 BPM W/350 PSI,7 BPM W/ 460 PSI AND 7-1/2 BPM W/530 PSI.THEN WENT 7-1/2"BPM,W/510 PSI. *464 BBLS PUMPED. -FLOW CHECK-WELL STATIC -OPEN ANNULAR PREVENTER. *12 BBL,FLUID LOSS FOR 12 HOUR TOUR. 13:00 - 15:30 2.50 FISH P DECOMP PJSM,POOH SBDP. INSTALL STRIPPING RUBBER AND AIR SLIPS. -CLEAN TRIP TANK TO BE ABLE TO POOH W/ CLEAN FLUID IN PITS. -BLOW DOWN TOP DRIVE. -POOH F/2,552'T/421'. -PULLAIR SLIPS AND STRIPPING RUBBER. FLOWCHECK BEFORE BRINGING NON SHEARABLES THROUGH STACK-WELL STATIC. r -STAND BACK LAST STAND OF 4"DP TO 327'. 15:30 - 16:30 1.00 FISH t P DECOMP PJSM,L/D DRESS OFF BHA FOR DRESSING 9-5/8"CSG STUB. -LID BOTTLE NECK FOR SAFETY JOINT. -STAND BACK 6-1/4"DRILL COLLARS. -BREAK OFF WASH PIPE EXTENSION WITH INNER DRESS OFF MILL,GUIDE SHOE AND BOOT BASKET. -CLEAN OUT BOOT BASKET. *5 GALLONS OF CEMENT RECOVERED IN BOOT BASKET. *CARBIDE BLADES ON INSIDE OF GUIDE SHOE WORE DOWN AND OBSERVED THAT TOP OF 9-5/8"STUB LEFT ROUGH MARKINGS 3-1/2'INSIDE ASSEMBLY. 16:30 - 17:00 0.50 FISH P DECOMP CLEAN AND CLEAR RIG FLOOR OF DRESS OFF ASSEMBLY. 17:00 - 18:30 1.50 FISH P DECOMP PJSM,P/U AND M/U OVERSHOT ASSEMBLY WITH PACK OFF TO LATCH STUB AND TEST 9-5/8"F/STUB AT 2,546'T/SAND AT 2,604'. -RIH WITH 6-1/4"DRILL COLLARS FROM DERRICK TO 312'. 18:30 - 19:30 1.00 FISH P DECOMP RIH WITH 4"DP FROM DERRICK WITH OVERSHOT ASSEMBLY TO PRESSURE TEST 9-5/8". -CHANGE OUT TO 4"ELEVATORS. -RIH W/4"DP F/312'T/2,496'. Printed 6/17/2013 9:27:06AM • r North America-ALASKA B • Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 I End Date:6/6/2013 'X4-OOX7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase • Description of Operations (hr) (usft) 19:30 - 21:30 2.00 FISH P DECOMP LATCH ON TO 9-5/8"STUB AND ATTEMPT TO PRESSURE TEST. -MAKE UP TOP DRIVE. -TURN PUMPS ON AT 2 BPM W/30 PSI. -TAG STUMP AT 2,548' -NOTICED PRESSURE INCREASE OF 80 PSI. -SHUT OFF PUMP. [-SET 10K ON STUMP,P/U 5K OVER STRING WEIGHT TO CONFIRM ENGAGED. -SET 15K DOWN TO DOUBLE CHECK,COME UP TO NEUTRAL WEIGHT -TURN PUMPS BACK ON AND RETURNS SEEN AT FLOW LINE. [-SWALLOW STUB WITH OVERSHOT F/2,548' T/2,551' AND PICK UP TO NEUTRAL WEIGHT. ,-ATTEMPT TO PRESSURE UP AND OBSERVED RETURNS AT SURFACE. -FLOW CHECK FOR 10 MINUTES-WELL I STATIC 21:30 - 22:00 0.50 FISH P DECOMP PJSM,POOH WITH OVERSHOT BHA DRESSED WITH PACK OFF. -BLOW DOWN TOP DRIVE. -POOH STANDING BACK 4"DP F/2,496'T/406'. 22:00 - 23:00 1.00 FISH- P DECOMP PULL OVERSHOT BHA. j-FLOW CHECK-WELL STATIC. I-STAND BACK LAST STAND OF 4"DP. -CHANGE OUT 4"ELEVATORS TO 4-1/2"AND STAND BACK 6-1/4"DRILL COLLARS. -PULL OVERSHOT AND PACK-OFF TO RIG FLOOR. -CLOSE BLIND/SHEAR RAMS. *RUBBER SEAL MISSING FROM PACK-OFF. *BOTTOM SIDE OF GRAPPLE ON INNER SIDE OF OVERSHOT WAS BENT OUT ON TAB. -BREAK OUT AND LAY DOWN OVERSHOT BHA. 23:00 - 00:00 1.00 FISH P DECOMP MOBILIZE 9-5/8"WASH OVER BHA AND TOOLS NEEDED FOR MAKE UP TO RIG FLOOR. -REVIEW DOYON SOP BEAVER SLIDE OPERATIONS AT PJSM. `SEND NOTICE OF INTENT TO TEST BOPE AT 23:10 THROUGH E-MAIL BECAUSE OF DIFFICULTY CONNECTING WITH AOGCC WEB SITE. '17 BBL FLUID LOSS FOR 12 HOUR TOUR. '29 BBL FLUID LOSS FOR PAST 24 HOURS. 5/26/2013 00:00 - 01:00 1.00 FISH P DECOMP PJSM,PICKUP AND RIG UP BAKER PULL TONGS TO MAKE UP 11-3/4"WASH PIPE ASSEMBLY. -TORQUE UP 1 JOINT OF 11-3/4"WASH PIPE TO 12-1/4"OD DRAG TOOTH SHOE. 01:00 - 01:30 0.50 FISH P DECOMP BLOW DOWN CHOKE LINE AS REVIEWED IN DOYON SOP DURING PJSM. -FLOW CHECK WELL AND OPEN BLIND/ SHEAR RAMS. -CHECK FOR PRESSURE UNDER BLIND/ SHEAR RAMS THROUGH CHOKE MANIFOLD. -OPEN BLIND/SHEAR RAMS. Printed 6/17/2013 9:27:06AM • r„ rr i . vs /ii � 'f"4,;li„,44:;� a ¢,'-� / 'A /@"'r «n're J 7 ,, , f '/� r y fi „/„/">/: -.././...,//,---4,/ �„,,, ,,v/;„4,4 47////1,,,,,-,(- ; / :/ il: �f / / , ® 'fir r r r ,/`r , y :,,:.),4Z, ,,,,,.'-7,..*35(.2.<,,,;;-Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 I Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Leve1) Date From-To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) I (usft) 01:30 03:00 1.50 FISH P DECOMP MAKE UP WASHOVER BHA TO WASHOVER AND RECUT 9-5/8"CSG.STUB AT 2,546'. 1-ASSEMBLE BHAAS DIRECTED BY2 BAKER FISHING. -MAKE UP BOOT BASKET AND RIG DOWN BAKER PULL TONGS. -PICK UP AND MAKE UP JAR AND BUMPER SUB WITH FLOAT SUB. RIH W " 'T/347'. 03:00 - 04:00 1.00 FISH P I DECOMP RIH WITH ITH 11-3/46-1/4"DRILL WASHOVERASSEMBLY COLLARS F/65 !WITH 12-1/4"DRAG TOOTH SHOE TO I WASHOVER 9-5/8". RIH WITH 4"DP FROM DERRICK F/347'T/ 2,435' 04:00 05:00 1.00 FISH P DECOMP WASHOVER 9-5/8"STUB AT 2,546'AND WASH %DOWN T/2,565' MAKE UP TOP DRIVE AND OBTAIN PARAMETERS. PUW=106K,SOW=105K,ROT-106K 70 RPM'S WITH`OFF TORQUE AT 0 TO 1 K,15 BPM WITH 830 PSI. r-OBTAIN SPR'S. WASH DOWN AT 15B R M WITH 830 PSI. 'WHILE ROTATING,TAG FILL AT 2,544'. WASH DOWN WITH 0 TO.5K WOB,WHILE PUMPING AT 15 BPM WITH 930 PSI., ROTATING AT 70 WITH 5 TO 10K TORQUE. OBSERVED TOP OF 9 5/8"STUB AT 2,546' AND WASHED OVER WITH NO PROBLEMS. , -WASHED DOWN FE 2,546'T/2,565'WHILE ROTATING AT 70 RPM'S WITH 5 TO 15K T PUMPING H 05:00 - 06:30 1.50 FISH P DECOMP RECIPROCATE AND ROTATE OVWIT ER 9-5/8" CASING F/2,550'T/AT 2,56515' HILE BPM W CLEANING 930 PSI. HOLE.ORQUE PUMP AT 15 BPM WITH 930 PSI.WHILE RECIPROCATING AND ROTATING AT 70 RPM'S WITH 2 TO 3K TORQUE PUMPING HI- 0E1 SWEEPS OUT OF HOLE UNTIL RETURNS ARE CLEAN. 06:30 - 07:00 0.50 FISH P DECOMP FLOWCHECK WELL-WELL STATIC. BLOW DOWN TOP DRIVE. I-LINE UP TRIP TANKAND GET ZERO MARK 07:00 08:00 1.00 FISH P DECOMP PJSM,POOH SBDP F/2,532'T/442'. FLOW CHECK BEFORE BRINGING NON-SHEARABLES THROUGH STACK-WELL STATIC. STAND BACK LAST STAND OF 4"DRILL PIPE - — _ _ IN DERRICK. 08:00 10:00 2.00 FISH P DECOMP 'PJSM,LID WASHOVER BHA. ST U AND BACK 3 STANDS " COLLARS. R/ BAKER TONGS AND OF BREAK 6-114 DOWN V ,WAPE,SHOE. -CLEAN DRI OUT SUB B OOT BASKET. BREAK E DOWN SAFETY SH PI JOINT. *5 GALLONS OF CEMENT/ARCTIC PAK RECOVERED FROM BOOT BASKET. Printed 6/17/2013 9:27:06AM • North America-ALASKA BPf � , Operation Summary Report' Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud DateTme:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UVN: Active datum:2:02 11/3/1979 00:00 c 74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 BOPSUR P DECOMP PJSM,R/U AND FLUSH STACK AT 17 BPM W/ 120 PSI AND 40 RPM. -CLEAN RIG FLOOR OF ALL WASHOVER TOOLS NOT NEEDED FOR UPCOMING OPERATIONS. 11:00 - 12:00 1.00 BOPSUR P DECOMP PJSM,DRAIN STACK TO OPEN BOTTOM RAM DOORS AND INSPECT. ■ *0 BBL LOSS FOR 12 HOUR TOUR. 12:00 - 13:30 1.50 BOPSUR P DECOMP PJSM,M/U CROSSOVERS TO TEST FOSVS. -INSTALL TEST PLUG. *CAMERON SERVICE HAND ON LOCATION TO RUN IN LOCK DOWN SCREWS ON TEST PLUG. 13:30 - 16:00 2.50 BOPSUR P DECOMP PJSM,INSPECTING RAMS ON BOPE. -BLEED ACCUMULATOR UNIT OFF AND START INSPECTION ON BOTTOM RAMS THEN THE BLIND RAMS. -ALL CAVITIES CLEAN AND RAM ELEMENTS PASSED INSPECTION. 16:00 - 17:30 1.50 BOPSUR P DECOMP I PJSM,CHANGE UPPER RAMS FROM 9-5/8" FIXED TO 7"FIXED. -INSTALL CROSSOVER ON TOP DRIVE AND INSTALL 4"TEST JOINT IN BOPE STACK 17:30 - 19:00 1.5G BOPSUR P DECOMP PJSM,SHELL TEST. WELL KILL DRILL. *6 BBLS TO FILL GAS BUSTER. -SHELL TEST BOPE DOORS AND CHOKE MANIFOLD. 19:00 - 00:00 5.00 BOPSUR -P DECOMP PJSM,TEST BOPE 250 PSI.LOW/3500 PSI. HIGH FOR 5 CHARTED MINUTES EACH. -TEST BOPE AS PER DOYON SOP. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH 4"TEST JOINT. -USE 4"AND 7"TEST JOINTS. -(2)-4"XT39 FOSVS,(1)-4"XT39 DART VALVE AND(1)4-1/2"IF FOSV. *AOGCC REP.JIM REGG WAIVED WITNESS. *0 BBLS FLUID LOSS FOR 12 HOUR TOUR. *0 BBLS FLUID LOSS FOR PAST 24 HOURS. 5/27/2013 00:00 - 01:00 1.00 BOPSUR P DECOMP COMPLETE WEEKLY BOPE TEST. -TEST 250/3500 PSI.FOR 5 CHARTED MINUTES EACH ADHERING TO DOYON SOP. *WITNESS OF TEST WAIVED BY JIM REGG. _ 01:00 - 02:30 1.50 BOPSUR P DECOMP RIG DOWN ALL TEST EQUIPMENT AND PREPARE EQUIPMENT FOR OPERATIONS. -BACK OUT LOCK DOWN SCREWS AND PULL TEST PLUG. -DRAIN STACK AND BLOW DOWN KILL AND CHOKE LINES WITH AIR. -MAKE UP SAFETY JOINT FOR NONSHEARABLES ACROSS STACK THROUGH BEAVER SLIDE TO RIG FLOOR. 02.30 - 03:00 0.50 FISH P DECOMP BRING IN TAPERED MILL ASSEMBLY I -REVIEW DOYON SOP FOR BEAVER SLIDE OPERATION AT PJSM. Printed 6/17/2013 9:27.06AM North America-ALASKA P BP Operation Summary Report; Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Datefrime:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:00 1.00 FISH P DECOMP PICKUP AND MAKE UP 8-1/2"TAPERED MILL BHA. -REVIEW DOYON SOP FOR BHA AT PJSM. -MAKE UP 8-1/2"TAPERED MILL BHA TO CLEAN INSIDE OF 9-5/8"CASING STUB AT 2,546'SO 8-1/4"MULTI STRING CUTTER CAN ACCESS 9-5/8"STUB FOR RE CUTTING OF 9-5/8"AT-2,555'. -RIH WITH 6-1/4"DRILL COLLARS FROM 'DERRICK T/309'. 04:00 - 05:00 1.00 FISH P DECOMP RN WITH 8-1/2"TAPERED MILL ASSEMBLY. -CHANGE OUT ELEVATORS F/4-1/2"T/4". -RUN 4"DP FROM DERRICK F/309'T/2,491'. 05:00 - 06:00 1.00 FISH P DECOMP CLEAN OUT INSIDE OF 9-5/8"STUB AT 2,546' FOR 8-1/4"MULTI STRING CUTTER WITH 8-1/2"TAPERED MILL. -MAKE UP TOP DRIVE AND OBTAIN PARAMETERS AT 2,494'. -OBTAIN SPR'S. -15 BPM WITH 670 PSI.,SOW=106K, PUW=103K,ROTW=105KAT 70 RPM'S WITH 0 TO 1K TORQUE. -STOP ROTATING AND WASH DOWN, • OBSERVE PRESSURE INCREASE T/720 PSI. WITH 5K WOB AT 2,546'. -WASH DOWN TO 2,551'WITH 5K WOB AND 720 PSI.AT 15 BPM. -PICK UP STRING TO 2,540'AND START ROTATING AT 70 RPM'S. • -ROTATE DOWN AND OBSERVE PRESSURE INCREASE TO 720 PSI.FROM 670 PSI.AT 2,546'. -CONTINUE TO ROTATE DOWN WITH 0 WOB. WHEN PASSING THROUGH TOP OF 9-5/8" CASING STUB OBSERVED TORQUE AND 1 TO 5K WOB AT 2,555'.CONTINUE TO CLEAN INSIDE OF 9-5/8"T/2,568'WHILE ROTATING. -WASH DOWN F/2,568'T/2,580'WITHOUT ROTATING. -PICK UP TO 2,545'. 06:00 - 07:00 1.00 FISH P DECOMP PUMP HIGH VIS SWEEP SURFACE TO SURFACE. -PUMPED 16 BPM W/750 PSI. 07:00 - 07:30 0.50 FISH P DECOMP PJSM,POOH SBDP. -POOH F/2,494'T/404'. -FLOW CHECK BEFORE BRINGING NONSHEARBLES ACROSS THE STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DP. 07:30 - 08:00 0.50 FISH P DECOMP PJSM,L/D 8-1/2"TAPERED MILL ASSY. -RACK BACK 3 STANDS OF DRILL COLLARS. -L/D CLEAN OUT ASSY. 08:00 - 09:00 1.00 FISH P DECOMP REVIEW DOYON SOP ON BEAVER SLIDE OPERATIONS AT PJSM. -CLEAN AND CLEAR RIG FLOOR OF MILLING TOOLS AND PICK UP 8-1/4"MULTI STRING CUTTER TOOLS. -MOBILIZE BHA TO RIG FLOOR THROUGH BEAVER SLIDE. Printed 6/17/2013 9.27.06AM • North America-ALASKA-BP • ii Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 'X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 09:30 0.50 FISH P DECOMP PJSM,M/U 8-1/4"MULTI STRING CUTTER WITH 6-3/8"TAPERED BULL NOSE. -M/U BULLNOSE,8-1/4"SWAGE,DOUBLE PIN SUB,CUTTER,CROSSOVER. 09:30 - 10:00 0.50 BOPSUR P DECOMP PJSM,DRAIN STACK AND BLOW DOWN CHOKE LINE. 10:00 - 10:30 0.50 FISH P ■ DECOMP RIH WITH 3 STANDS OF 6-1/4"DRILL COLLARS. -CHANGE OUT ELEVATORS TO 4". 10:30 - 11:00 0.50 FISH P . DECOMP .PJSM RIH F/300'TO 2;485'. -RIH WITH 4"DP FROM DERRICK. 11:00 - 11:30 0.50 FISH P DECOMP OBTAIN PARAMETERS FOR 8-1/4" MULTI-STRING CUTTER ASSY. -PUW=102K,SOW=105K,ROT WT=106KAT 60 RPM W/0-1K FREE TORQUE. -SLIDE IN TO 2,550'AND TURN PUMPS ON AT 300 PSI. -NO MOVEMENT OR WOB AT TOP OF STUB AT 2,546' -LOCATE COLLAR AT 2,567,PULL UP 14'TO 2,553. --START TO ROTATE AT 60 RPM. PUMPS ON 300 PSI,SEEN TORQUE NCREASE 1-4K. -BRING PUMPS UP TO 500 PSI. -3-1/2 MINUTES TO CUT,400 PSI DECREASE IN PRESSURE,TORQUE FELL OFF. 11:30 - 12:00 0.50 FISI.1 P DECOMP -PJSM,POOH SBDP W/8-1/4"MULTI STRING CUTTER ASSY. -PUMP DRY JOB. -RACK BACK 1 STAND OF 4"DRILL PIPE. -BLOW DOWN TOP DRIVE AND FLOW CHECK WELL-WELL STATIC. -POOH F/2,485 T/2,010. *O BBL FLUID LOSS FOR 12 HOUR TOUR. 12:00 - 12:30 0.50 FISH P ._ DECOMP RIG SERVICE,LUBRICATE TOP DRIVE, BLOCKS AND DRAW WORKS. 12:30 - 13:00 0.50 FISH P DECOMP PJSM,POOH SBDP F/2,010 T/400'. 13:00 - 13:30 0.50 FISH P DECOMP FLOW CHECK BEFORE BRINGING NONSHEARABLES THROUGH STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DRILL PIPE T/309'. -CHANGE OUT ELEVATORS FROM 4"TO 4-1/2". 13:30 - 15:00 1.50 FISH P DECOMP PJSM,UD 8-1/4"MULTI-STRING CUTTER BHA F/309'. -STAND BACK 3 6-1/4"DRILL COLLARS. -UD 8-1/4"MULTI STRING CUTTER BHA. 1.00 FISH P ■- DECOMP PJSM, RES P/U AND M/U GRAPPLE SPEAR ASSY. DRESSED WITH GRAPPLE TO ENGAGE 9-5/B" 15:00 16:00 47#CASING. 16:00 - 17:00 1.00 FISH P DECOMP PJSM,RIH F/10'T/2,479'. -OBTAIN PARAMETERS. -PUW=96K,SOW=91 K -TAGGED FISH AT 2,548',SET 10K DOWN TO VERIFY ENGAGED. -FLOW CHECK FOR 10 MINUTES-WELL STATIC. Printed 6/17/2013 9:27:06AM f0rth America-ALASKA-BP 44',4 40‘44,:g.e4ri44444/4-44g44A 44444 4"4 44.4-, a r , Operation Summary Report -- Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 18:30 1.50 FISH P DECOMP PJSM,POOH SBDP F12,553'T/10'. -RACK BACK 4"DP IN DERRICK. 'RECOVERED 6.5'OF 9-5/8"CSG. 'TOP OF 9-5/8"CASING STUB AT 2,553'. 18:30 - 19:00 0.50 FISH P DECOMP PJSM,LJD SPEAR BHA AND CUT JOINT TO PIPE SHED. -BEAVER SLIDE OPERATIONS,P/U 11-3/4" DRESS OFF BHA COMPONENTS. 19:00 - 20:30 1.50 FISH P DECOMP PJSM,M/U 9-5/8"DRESS OFF ASSY.BHA. -M/U WASH OVER SHOE,BOOT BASKET, JARS AND BUMPER SUB. -RIH W/6-1/4"DRILL COLLARS TO 322'. -CHANGE OUT ELEVATORS TO 4" 20:30 - 21:00 0.50 FISH P DECOMP PJSM,RIH W1tI-5/8"DRESS OFF ASSY WITH 4"DP FROM DERRICK. -RIH F/321'T/2,506'. 21:00 - 22:30 1.50 FISH P DECOMP DRESS OFF 9-5/8"STUB FOR CASING PATCH. -MAKE UP TOP DRIVE AND OBTAIN PARAMETERS. -OBTAIN SPR'S. -PUW=104K,SOW=106K,ROTW=106KAT70 I RPM TORQUE 0-1K AT 15 BPM W/580 PSI.TAGGED FISH AT 2,552'AND SWALLOWED 7`T/SHOE DEPTH OF 2,559'MAKING MILL DEPTH AT 2,552'. -START MILLING WITH 15 BPM W/70 RPM TORQUE 1-5K PRESSURE INCREASE 580 TO 620 PSI. -MILL 9-5/8"STUB FROM 2,552'T/2,554'WITH SHOE DEPTH OF 2,561'. 22:30 - 23:00 0.50 FISH P DECOMP PUMP HIGH VIS SWEEP FOLLOWED BY 16 BPM W/760 PSI. `OBSERVED 1/2 GALLON OF METAL SHAVINGS AT MAGNETS IN FLOW TROUGH ALSO 4 GALLONS OF ARCTIC PAK/CEMENT RETURNS. -FLOW CHECK-WELL STATIC. 23:00 - 00:00 1.00 FISH P DECOMP PJSM,POOH W/9-5/8"DRESS OFF ASSY. -BLOW DOWN TOP DRIVE AND INSTALL STRIPPING RUBBER. -POOH F/2,561'T/400'. -STANDING BACK 4"DP IN DERRICK T/321'. -FLOW CHECK BEFORE BRINGING NONSHEARABLES THOUGH STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DRILL PIPE. 5/28/2013 00:00 - 01:30 1.50 FISH P DECOMP PJSM,POOH WITH 9-5/8"DRESS OFF BHA. -STAND BACK 6-1/4"DRILL COLLARS. -BREAK OUT AND LAY DOWN DRESS OFF BHA. -CLEAN OUT BOOT BASKET. "RECOVERED 1/2 GALLON OF METAL SHAVINGS FROM BOOT BASKET. 01:30 - 02:30 1.00 BOPSUR P DECOMP CLEAR AND CLEAN RIG FLOOR. -DRAIN BOPE STACK. -BLOW DOWN CHOKE AND KILL LINES. -BLOW DOWN HOLE FILLAND BLEEDER LINES. Printed 6/17/2013 9:27.06AM • •/ ,rf menca-ALASKA-BP S/ ! '_ North A % Operation Summary Report , mil �,,.,...; . Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date.6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date 1 From-To Hrs Task Code ; NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 04:30 2.00 BOPSUR P DECOMP NIPPLE DOWN 13-5/8"5M BOPE STACK -REVIEW DOYON SOP ON NIPPLING DOWN BOPE STACK DURING PJSM. -REMOVE FLOW LINE,HOLE FILL LINE, BLEEDER LINE,RISER AND TURNBUCKLES. 1-NIPPLE DOWN STACK AND SET BACK PLACE ON STUMP IN CELLAR AND SECURE SAME. '*SPILL DRILL HELD;RESPONSE TIME 1 MINUTE AND 5 SECONDS. 04:30 - 05:00 0.50 BOPSUR P DECOMP REMOVE OUTER ANNULUS VALVES FROM 13-3/8"WELLHEAD. !-BLOW DOWN HARD LINE TO FLOWBACK 1 TANK. -REMOVE 2"1502 IRON AND FLANGE FROM OUTER ANNULUS. I-REMOVE BOTH GATE VALVES FROM WORKING SIDE OF OUTER ANNULUS. 05:00 - 07:00 2.00 FISH P DECOMP PICK UP AND MAKE UP 11-3/4"MULTI STRING CUTTER TO CUT 13-3/8"AT SURFACE. I-ASSEMBLE CUTTER AS DIRECTED BY BAKER FISHING. -SECURE CASING HEAD IN CELLAR WITH BRIDGE CRANES IN CELLAR. CAMERON MEASURE AND CONFIRM WITH BAKER ON CUT DEPTH. MOBILIZE CENTRALIZERS TO RIG FLOOR. 07:00 - 10:30 3.50 FISI1 P DECOMP PJSM,RIH W/ 11-3/4"MULTI-STRING CUT ASSY.TO CUT 13-3/8"CSG HEAD. -START ROTATING AT 60 RPM W/0 FREE TORQUE. -BRING PUMP UP TO 150 PSI AND ALLOW TO ENGAGE. -STAGE PUMPS UP TO;250 PSI,300 PSI,400 PSI,500 PSI,600 PSI 700,700 PSI AND 800 PSI. *CUT COMPLETE AT 08:45,P/U 4'. -ATTACH BRIDGE CRANES AND BLEED OFF PUMP PRESSURE. -WORK CSG HEAD OFF AND PULL CUTTER TO RIG FLOOR. -CHANGE KNIVES ON CUTTER TO CUT 20'. -BRING PRESSURE UP TO 100 PSI,200 PSI AND THEN 300 PSI. -BLEED OFF PRESSURE TO 100 PSI. -START ROTATING AT 50 RPM AND STAGE PUMPS UP TO;200 PSI,300 PSI,400 PSI AND 450 PSI. *CUT COMPLETE AT 10:20,P/U 5'. -BLEED PRESSURE OFF AND REMOVE 20" CUT PIECE. 10:30 - 11:00 0.50 FISH P DECOMP 'BREAK AND LID 11-3/4"MULTI-STRING CUTTER BHA. -M/U 4"DP AND STAND BACK IN DERRICK 11:00 - 12:00 1.00 FISH P DECOMP PJSM,CLEAR RIG FLOOR OF ALL TOOLS AND I EQUIPMENT NOT NEEDED. -BEAVER SLIDE OPERATIONS. -REMOVE SHORT BAILS. 12:00 - 13:00 1.00 CASING P DECOMP PJSM,R/U FOR RUNNING 9-5/8"CSG. -INSTALL LONG BALES. -BEAVER SLIDE OPERATIONS,MOBILIZE CROSSOVERS AND PUP JOINTS TO RIG I FLOOR. Printed 6/17/2013 9:27:06AM North America-ALASKA-B Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 13:30 0.50 CASING P DECOMP PJSM,INSPECT AND SERVICE TOP DRIVE, BLOCKS AND DRAW WORKS. 13:30 - 14:30 1.00 CASING P DECOMP PJSM,INSTALL 9-5/8"SIDE DOOR ELEVATORS. -R/U POWER TONGS,AND MAKE UP SAFETY CROSSOVER FOR FLOOR VALVE. 14:30 - 15:00 0.50 CASING P DECOMP PJSM,W/DOYON,HES AND BAKER SERVICE REPS ON RIH W/9-5/8"CSG. 15:00 - 20:00 5.00 CASING ' P DECOMP M/U BOWEN CSG PATCH&HES CEMENTER. -RIH W19-5/8"47#L-80 HYD 563 CSG. *9-5/8"47#L-80 HYD 563 CSG MADE UP TO 15800 FT/LBS *PARAMETERS AT 2515'151K SLACK OFF AND 156K PICK UP 20:00 - 20:30 0.50 CASING P DECOMP PJSM,LAND 9-5/8"CSG. -TAG AT 2555.75,15K OVER,ROTATE 9 5/8" CASING 1/2 TURN,ENGAGE CASING PATCH -RETAG AT 2,558',SET DOWN 20K,PULL 25K OVER. -LET SET FOR 5 MINUTES. -OVERPULL 100K TO 255K. *FINAL SOW=151 K,PUW=157K. 20:30 - 21:30 1.00 CASING P DECOMP -PJSM,MAKE UP CROSSOVER FOR CEMENT HEAD. 21:30 - 23:30 2.00 CASING, P DECOMP PJSM,CENTRILIZEANNULUSES -INSTALL CENTRILIZERS ON 9-5/8 x 13 3/8" -INSTALL AND TACK WELD CENTRILIZER WEDGES ON 13 3/8"X 20"ANNULUS 23:30 - 00:00 0.50 CASING N SEAL - DECOMP PJSM,RN SLB RIG UP CEMENT LINE AND ATTEMPT TO PRESSURE TEST TO 4000 PSI. -FILL CEMENT LINES WITH WATER AND DISCOVER LEAK ON CROSSOVER TO CEMENT HEAD,9 5/8"BTC X ACME. -SET SLIPS AND REMOVE CROSSOVER AND CEMENT HEAD. 5/29/2013 00:00 - 01:00 1.00 CASING N SFAL DECOMP R/D CEMENT LINE,CEMENT HEAD AND CROSSOVER. -CLEAN THREADS AND INSPECT. -RE-DOPE AND INSTALL CROSSOVER CEMENT HEAD AND CEMENT LINE *9 5/8"BTC BOX HAD MINOR GALLING OF THREADS-NEED TO REPLACE COLLAR. 01:00 - 01:30 0.50 CASING P DECOMP PJSM,PRESSURE TEST CEMENT LINE 250 PSI LOW AND 4,000 PSI HIGH F/5 MINUTES EACH ON CHART. -BLEED OFF PRESSURE AND SWAP OVER TO RIG PUMP. Printed 6/17/2013 9:27:06AM North America-ALASKA B pr ` ' - Operation Summary Report; Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 ,Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:00 0.50 CASING P DECOMP PJSM,TEST 9 5/8 CASING AND SET BAKER ECP. -PRESSURE TEST 9-5/8"CSG T/1,000 PSI FOR 5 MINUTES. -INCREASE PRESSURE IN 100 PSI INCREMENTS UNTIL INFLATION VALVE ON BAKER ECP OPENED AT 1690 PSI. -LET PRESSURE STABILIZE AT 1560 AND BRING PRESSURE UP TO 2,000 PSI TO CLOSE INFLATION VALVE. -TEST FOR 10 MINUTES AT 2000 PSI. -BLEED PRESSURE OFF TO 0 PSI. -BRING PRESSURE UP IN 1000 PSI INCREMENTS AND ALLOW TO STABILIZE, SLEEVE ON HES ES CEMENTER OPENED AT 2980 PSI. -CIRCULATE 3 BBLS OF SEAWATER TAKING RETURNS TO CELLAR TO CONFIRM HES ES CEMENTER PORTS OPEN. 02:00 - 05:30 3.50 CASING P DECOMP PJSM,PUMP CEMENT JOB. -SLB PUMP 5 BBL FRESH WATER SPACER. -SLB PUMP 165 BBLS 15.8 PPG CLASS G CEMENT AT 5 BPM AT 128 PSI. -LAUNCH TOP PLUG. -SLB PUMP 5 BBLS FRESH WATER. -SWITCH TO RIG PUMPS,PUMP SEAWATER AT 5 BPM AT 60 PSI. -RETURNS IN CELLAR START TO SLOW AT 70 BBLS PUMPED BY RIG. -SLOW RATE TO 2 BPM AT 30 PSI,START TO SEE INCREASE IN PRESSURE AT 82 BBLS PUMPED BY RIG AT 70 PSI. -PRESSURE SLOWLY CLIMBS AND RETURNS MATCHING PUMPED VOLUME AT 106 BBLS PUMPED BY RIG AT 2 BPM AT 440 PSI. -CONTINUE TO PUMP AT 2 BPM,CEMENT RETURNS OBSERVED IN CELLAR AT 155 BBLS PUMPED BY RIG. -SLOW RATE TO 0.5 BPM AT 174 BBLS PUMPED BY RIG.PRESSURE AT 1200 PSI. -PLUG BUMPED AT 175 BBLS PUMPED BY RIG. 'PLUG BUMPED 4 BBLS EARLY. '20 BBLS CEMENT RETURNS TO SURFACE. -INCREASE PRESSURE TO 2110 PSI AND HOLD FOR 2 MINUTES TO CLOSE ES CEMENTER SLEEVE. -HOLD PRESSURE FOR 5 MINUTES AND BLEED OFF. -FLOW CHECK WELL FOR 10 MINUTES,NO FLOW OBSERVED. 05:30 - 07:00 1.50 CASING P DECOMP PJSM,RIG DOWN CEMENT HEAD AND CSG RUNNING EQUIPMENT. -SUCK OUT 9-5/8"CSG F/CUT. -REMOVE CEMENT HEAD AND CROSSOVER. -CLEAR RIG FLOOR OF ALL TOOLS AND EQUIPMENT NOT NEEDED. 07:00 - 08:00 1.00 FISH P DECOMP PJSM,SET UP WACHS CUTTER TO CUT 9-5/8" CSG. -HOLD 7K UP WEIGHT. 08:00 - 08:30 0.50 FISH P DECOMP UD CROSSOVER,15 PUP JOINT AND CUT JOINT. Printed 6/17/2013 9:27:06AM North America-ALASKA BPS Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X400X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 12:00 3.50 FISH P DECOMP PJSM,INSTALL CAMERON 9 5/8"SLIP LOCK WELLHEAD -DRESS OFF TOP OF CUT ON 9-5/8"CSG. -INSTALL CAMERON 9 5/8 SLIP LOCK WELLHEAD AND TEST 250 PSI LOW F/5 MINS AND 3,800 PSI HIGH F/30 MINUTES. -SIM OPS PJSM,CHANGE OUT ELEVATOR LINKS. -MOBILIZE BHA TOOLS TO THE RIG FLOOR. `-REMOVE LEFT OVER 9-5/8"CSG FROM PIPE SHED. -LOAD 7"CSG INTO PIPE SHED. 12:00 - 19:00 7.00 BOPSUR P DECOMP NIPPLE UP BOPS -INSTALL 11"x 13-3/8"ADAPTER FLANGE. -NIPPLE UP BOPS. -FINISH INSTALLING DOUBLE SPACER SPOOLS ON BOPE STACK,PITCHER NIPPLE, FLOW LINE AND TURN BUCKLES. -CUT 4'OFF RISER TO FIT FLOW LINE. 19:00 - 19:30 0.50 BOPSUR P DECOMP PJSM,SET TEST PLUG. 19:30 - 21:00 1.50 BOPSUR P DECOMP PJSM,TEST BOPE BREAKS ON STACK 250 PSI LOWAND 3,500 PSI HIGH FOR 5 CHARTED MINUTES-BOTH TESTS GOOD. '-PULL TEST PLUG AND INSTALL 9-7/8"WEAR RING. 21:00 - 22:00 1.00 CLEAN P DECOMP PJSM,M/U SHOE TRACT DRILL OUT BHA. -M/U 8-1/2"HYC BIT W/3x20 JETS W/BOOT BASKETS,JARS AND BUMPER SUB. -M/U,RIH W/3 STANDS OF 6-1/4"DRILL COLLARS TO 322'. -CHANGE OUT ELEVATORS FROM 4-1/2"TO 4', 22:00 - 23:00 1.00 CLEAN P.. DECOMP PJSM,RIH W/SHOE TRACT DRILL OUT BHA -RIH F/322'T/2,413'. -BRING TOP DRIVE UP. PUW=102K,SOW 105K,ROT WT=105K W/90 RPM AT 1K TORQUE,PUMP AT 8BPM AT 360 PSI 'SPR OBTIANED AT 2470'W/8.5 PPG SEAWATER,30 SPM=70PSI,40SPM=100PSI 23:00 - 00:00 1.00 CLEAN P DECOMP MILL THROUGH CEMENT AT 2,480'. -AT 2480',1-3K WIEGHT ON BIT,REAMM/ASH DOWN,AT 2509 WIEGHT ON BIT INCREASE TO 5K -TAG PLUG AT 2,509'. 5/30/2013 00:00 - 01:30 1.50 CLEAN P DECOMP DRILL PLUG ANDES CEMENTER. -DRILL THROUGH PLUG AND ES CEMENTER AT 90 RPM,8 BPM WITH 3-8K WOB FROM 2508'-2512'. -REAM FROM 2505'TO 2515'3 TIMES. -SLIDE FROM 2505'TO 2515'WITH NO WOB INCREASE. Printed 6/17/2013 9:27:06AM • NorthAmerica-ALASKA BP , Operation Summary Report f Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:30 3.00 CLEAN P DECOMP WASH/MILL OUT TO TOP OF SAND. -WASH/MILL OUT FROM 2515'TO 2565 V ITH 1-5K WOB AT 90 RPM,0-2K TORQUE PUMPING AT 8 BPM. • *GROUND UP CEMENT,ARCTIC PAC AND SMALL PIECES OF PLUG RUBBER COMING ACROSS SHAKERS. PUMP HI VIS SWEEP,NO SAND OBSERVED AT BOTTOMS UP. -WASH/MILL OUT FROM 2565'TO 2575'WITH 1-5K WOB AT 90 RPM,0-2K TORQUE PUMPING AT 8 BPM. -WOB DECREASED TO OK AT 2575'. -WASH FROM 2575'TO 2595' AT 90 RPM,OK -TORQUE PUMPING AT 8 13PM. NO;SAND AT SHAKERS AT BOTTOMS UP FROM 2595'. -WASH FROM 2595'TO 2605' SLIGHT INCREASE IN WOB,STOP AND PUMP HI VIS SWEEP. *SAND OBSERVED AT BOTTOMS UP. 04'30 - 05:00 I 0.50 CLEAN P' DECOMP DRY MILLING TOP OF SAND. • -ROTATE AT 90 RPM WITH 0-2K TORQUE WITH 2K WOB FOR 15 MINUTES AT 2605'. -PULL UP TO 2600' -RIH WITH NO ROTATION OR PUMP AND TAG AT 2608'. -FLOW CHECK WELL-WELL STATIC. 05:00 - 05:30 0.50 CLEAN P DECOMP PJSM,POOH SBDP. -POOH F/2,600'T/420'. -FLOWCHECK BEFORE BRINGING NON-SHEARABLES THROUGH THE STACK.-WELL STATIC. -RACK BACK LAST STAND OF 4"DP. 05:30 - 07:30 2.00 CLEAN P DECOMP ;PJSM,UD 9-5/8"CLEAN OUT ASSY. -RACK BACK 3 STANDS OF 6-1/4"DRILL COLLARS. -BREAK BIT,REMOVE AND CLEAN OUT JUNK BASKETS. -REINSTALL JUNK BASKETS. -PJSM,P/U AND M/U REVERSE CIRCULATING JUNK BASKET BHA. 07:30 - 08:00 0.50 CLEAN P DECOMP PJSM,DRAIN STACK -BLOW DOWN CHOKE LINE AND HOLE FILL LINES. -GET GOOD ZERO MARK ON TRIP TANK FOR RIH. 08:00 - 08:30 0.50 FISH P DECOMP M/U 3 STANDS OF 6-1/4"DRILL COLLARS. -RIH T/330'. 08:30 - 09:30 1.00 FISH P DECOMP PJSM,RIH W/RCJB BHA. -RIH F/330'T/2,229'. *KICK WHILE TRIPPING DRILL HELD, RESPONSE TIME 1 MINUTE AND 5 SECONDS. -INSTALL FOSV 1 JOINT BELOW THE ROTARY TABLE. 09:30 - 11:00 1.50 FISH P DECOMP PJSM,SLIP AND CUT DRILLING LINE. -SUP AND CUT 59'OF DRILLING LINE. -SERVICE TOP DRIVE,BLOCKS,IRON ROUGHNECK AND DRAW WORKS. 11:00 - 11:30 0.50 FISH P DECOMP REMOVE SAFETY VALVE. -SLOWLY RIH W/4"DP F/2,229'T/2,609'. Printed 6/17/2013 9:27:06AM • /I North America-ALASKA BP Operation Summary Report' Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12.00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ■ Description of Operations (hr) (usft) 11:30 - 12:30 1.00 FISH P DECOMP CIRCULATE OUT SAND AND DEBRIS. -OBTAIN PARAMETERS FOR RCJB BHA -PUW=106K,SOW=108K,ROT WT=108KAT 60 RPM W/0-1 K FREE TORQUE. -RIH AND TAGGED TOP OF SAND AT 2,610'. -START ROTATION AT 60 RPM AND DRY DRILL 2'' -BEGIN PUMPING 5 BPM W/410 PSI. I-WASH DOWN TO 2,620'. -P/U AND PUMP 10 BPM W/1,350 PSI. -CIRCULATE SWEEP AROUND AT 16 BPM W/ 1,600 PSI. 12:30 - 13:00 0.50 FISH P DECOMP FLOW CHECK-WELL-STATIC. -INSTALLAIR SLIPS AND BLOW DOWN TOP DRIVE. 13:00 - 13:30 0.50 FISH P DECOMP PJSM,POOH W/RCJB BHA. -POOH F/2,514'T/400'. -FLOW CHECK BEFORE BRINGING NON-SHEARABLES THROUGH STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DP. 13:30 - 15:30 2.00 FISH F' DECOMP I CHANGE OUT 4"ELEVATORS TO 4-1/2". -STAND BACK 3 STANDS OF 6-1/4"DRILL COLLARS. 'CLEANED OUT 2 CUPS OF ALUMINUM SHAVINGS. -CLEAN RIG FLOOR FROM SLIP HAZARDS. -CLEAN UP BHAAND INSPECT. 15:30 - 17:00 1.50 FISH P DECOMP PJSM,M/U RCJB BHA BACK TOGETHER. -M/U BOOT BASKETS. RIH W/6-1/4"DRILL COLLARS T/329'. 17:00 - 18:00 1.00 FISH P DECOMP !PJSM,RIH W/RCJB. R- IH F/329'T/2,609'. 18:00 - 19:30 1.50 FISH P DECOMP CIRCULATE OUT SAND AND DEBRIS. I-OBTAIN PARAMETERS FOR RCJB BHA. '-SOW=108K,PUW=108K,ROT WT=108K W/60 RPM. II-TAG SAND AT 2,624',DRY DRILL 1.5'. -PUMP 10 BPM W/1,220 PSI. JET T/2,636'. -PUMP 30 BBLS HIGH VIS SWEEP. -MONITOR WELL-STATIC. -BLOW DOWN LINES. 19:30 - 20:30 1.00 FISH P DECOMP PJSM,POOH W/RCJB BHA. -POOH F/2,609'T/400'. -FLOW CHECK BEFORE BRINGING NON-SHEARABLES THROUGH STACK-WELL STATIC. -STAND BACK LAST STAND OF 4"DP. 20:30 - 21:30 1.00 FISH P DECOMP CHANGE ELEVATORS FROM 4"TO 4-1/2". -RACK BACK 3 STANDS OF 6-1/4"DRILL COLLARS. -BREAK APART NOSE CONE AND CHECK RCJB AND BOOT BASKETS FOR DEBRIS. `LESS THAN A QUARTER CUP OF FINE METAL SHAVING,FINE CEMENT PARTICLES RECOVERED. 21:30 - 23:30 2.00 DHB P DECOMP PJSM,UD RCJB BHA THROUGH BEAVER SLIDE. -MOBILIZE HES RUNNING TOOL TO RIG FLOOR. 23:30 - 00:00 0.50 DHB P DECOMP PJSM,M/U HES RUNNING TOOL. Printed 6/17/2013 9:27:06AM it S North America-ALASKA-B ** "„,%; �;,r% y,,/'1, Operation Summary Report r,.. -ASV ziAr"VOMPIA Common Wet Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/31/2013 00:00 - 00:30 0.50 DHB P DECOMP I PJSM,DRAIN STACK. -BLOW DOWN CHOKE AND KILL LINE. -FILL STACK UP W/SEAWATER. -GET GOOD ZERO MARK ON TRIP TANK 00:30 - 02:00 1.50 DHB P DECOMP RIH WITH 4 DP AND BRIDGE PLUG I RETRIEVING TOOL TO 2580'. -PJSM ON TRIPPING PIPE IN HOLE. -OBTAIN PARAMETERS,PUW 90K,SOW 92K, SPR MP1=20 SPM AT 40 PSI,30 SPM AT 50 PSI,SPR MP2=20 SPM AT 50 PSI,30 SPM AT 60 PSI. 02:00 - 02:30 0.50 DHB P DECOMP WASH DOWN TO RBP. -WASH IN HOLE FROM 2580'TO 2648 ,PUMPING AT 8 BPM AT 300 PSI. -PUMP 30 BBL HI VIS SWEEP AT 8 BPM AT 300 PSI. *TRACE OF SAND NOTED AT SWEEP TO SURFACE 02:30 - 03:30 1.00 DHB P DECOMP RETRIEVE RBP -REDUCE PUMP RATE TO 3 BPM AT 80 PSI. -RIH TO 2649 AND TAG TOP OF RBP,PUMP .!PRESSURE INCREASE TO 100 PSI. '-SET DOWN 5K ON RBP AND ENGAGE 1.5'OF ,RBP FISHNECK -PULL 10 K OVER STRING WEIGHT,SLACK OFF 20 K TO CONFIRM ENGAGEMENT. -ROTATE 1/2 TURN TO RIGHT,PULL 10K TO OPEN PACKER BYPASS. -SET 1 MINUTE AND RBP RELEASED. -MONITOR WELL WHILE ALLOWING PACKER TO RELAX. • WELL STATIC. -PULL UP HOLE 30'WITH OVERPULLS.AT I EACH OVERPULL RUN BACK IN HOLE-FREE. THEN ABLE TO PULL UP HOLE.WORK PIPE UNTIL NO OVERPULLS EXPERIENCED. -RUN BACK IN HOLE PAS T ORIGINAL SETTING DEPTH TO 2655 TO CONFIRM RBP ENGAGEMENT. 03:30 - 05:00 1.50 DHB P DECOMP PULL OUT OF HOLE WITH RBP. -PULL FIRST STANDS AT 5 MINUTES PER STAND WITH NO OVERPULLS AND CONFIRMING CORRECT HOLEFILL. j-BLOW DOWN TOP DRIVE,RESET TRIP TANK -POOH FROM 2580 TO 16' -MONITOR HOLE BEFORE PULLING NON SHEARABLES THROUGH BOPS. -POOH AND LAY DOWN RETRIEVAL TOOL AND RBP. *RETRIEVABLE BRIDGE PLUG COMPLETE ASSEMBLY ACCOUNTED FOR AT SURFACE. 05:00 - 07:30 2.50 DHB P DECOMP LAY DOWN RPB HANDLING TOOLS. -PJSM,L/D HALLIBURTON TOOLS. I-CHANGE OUT ELEVATORS. -RIH WITH 6-1/4”DRILL COLLARS,REMOVE CROSSOVER AND 4.5"IF LIFT SUB. -LAY DOWN 6-1/4"DRILL COLLARS. *SIM-OPS:MOBILIZE CENTRALIZER'S TO RIG FLOOR. Printed 6/17/2013 9:27:06AM North America-ALASKA Bl Operation Summary Report / s Common Well Name.X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 1X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM I Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 1 07:30 - 08:00 0.50 BOPSUR P DECOMP PULL WEAR BUSHING. -MAKE UP 4"TEST JOINT,4"PUP JOINT, WEAR BUSHING RUNNING TOOL. 1-PULL WEAR BUSHING 08:00 - 10:00 2.00 CASING P DECOMP RIG UP TO RUN 7"CASING. -LAY DOWN SHORT BALES,PICK UP LONG BALES AND INSTALL. -PICK UP 16 CENTRALIZER'S. -PICK UP CASING POWER TONGS WITH TORQUE TURN AND SIDE DOOR ELEVATORS WITH SLIPS. 10:00 19:00 9.00 CASING P DECOMP RUN 7",26#L-80 VAMTOP-HC CASING TO 9009'MD. 1-PJSM,RUN 7"VAM TOP 26#PPF BTC-M L-80 1 CASING. 1-MAKE UP OVER SHOT AND FLOAT. 1-RIH WITH FIRST 2 ASSEMBLIES AND FIRST 2 FULL JOINTS -CHECK FLOATS *USE JET LUBE SEAL GUARD PIPE DOPE *7"VAM TOP 26#PPF BTC-M L-80 CASING TORQUED TO 11950 FT/LBS. RIH T/5821'FILLING ON THE FLY AND TOPPING OFF EVERY 5TH JOINT WITH 8.5 SEAWATER. -PLACE A CENTRALIZER ON EVERY JOINT FROM JOINT#1 TO JOINT#16 19:00 - 19:30 0.50 CASING P_ DECOMP PICKUP CEMENT HEAD. -PJSM,LAY DOWN SUPER SACK OF THREAD I PROTECTORS. 1F-PICK UP CEMENT XO'S AND CEMENT HEAD. 19:30 - 00:00 4.50 CASING._ P DECOMP RUN 7"CASING -RIH WITH 7"CASING F/5821'T/9009' -PUW=257K,SOW=215K.AT 9000' 6/1/2013 00:00 - 01:00 1.00 CASING P DECOMP I RIG UP CEMENT HEAD. -INSTALL SCAFFOLDING FOR INSTALLING 1 AND OPERATING CEMENT HEAD -INSTALL TOP AND BOTTOM WIPER PLUGS IN CEMENT HEAD -R/U CROSSOVER AND CEMENT HEAD TO 7' CASING. 01:00 - 03:30 2.50 CASING P DECOMP DISPLACE WELL BORE FLUIDS. -PJSM,DISPLACE 8.5 PPG SEAWATER TO 9.8 PPG BRINE TAKING RETURNS TO PITS UNTIL FULL THEN RETURNS TO ROCKWASHER. -PUMP 5 BPM AT 200 PSI. -575 BBLS DISPLACED WITH NO ROTATION IOR RECIPROCATION OR SPACER. Printed 6/17/2013 9:27:06AM • orfh America-ALASKA BP Operation Summary Re pc)rt`s Common Well Name:X-02 • AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X400X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Leven Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 07:30 4.00 CASING P DECOMP CEMENT 7"CASING AS FOLLOWS -PJSM,FILL LINES PRESSURE TEST SLB CEMENT LINES AND LRS LINES. TEST 250 LOW/4500 PSI HIGH FOR FIVE CHARTED MINS.EACH. -LRS PUMP 25 BBL OF DIESELAT 6 BPM, DROP BOTTOM PLUG. -SLB PUMP 16 BBL CLASS G 15.8 PPG I CEMENT AT 6 BPM,(YIELD 1.17 CU.FT/SK) -SLB PUMP 5 BBLS DISPLACEMENT FRESH WATER AHEAD -PERFORM REST OF DISPLACEMENT WITH RIG PUMPS AND 8.5 PPG SEAWATER -320 BBLS DISPLACED AT 5 BPM:ICP 250 PSI 50%RETURN FLOW,FCP 520 PSI 50% RETURN FLOW -10 BBLS DISPLACED AT 2 BPM:ICP 387 PSI 20%RETURN FLOW,FCP 510 20%RETURN FLOW -1.5 BBLS DISPLACED AT.5 BPM:ICP 405 PSI 5%RETURN FLOW,FCP 500 PSI 5%RETURN I FLOW -REDUCE RATE TO.5 BPM TO BUMP PLUG: -FINAL CIRCULATING PRESSURE 500 PSI -BUMP PLUG AND INCREASE PRESSURE TO 1000 PSI.CHECK FLOATS-GOOD -TOTAL DISPLACEMENT VOLUME 331.5 BBLS (MEASURED BY STROKES AT 95%PUMP EFFICIENCY) 07:30 - 08:30 1.00 CASING P DECOMP PERFORM 7"CASING PRESSURE TEST TO 3500 PSI -PJSM,PRESSURE UP ON CASING TO 3500 PSI.HOLD FOR 30 MINUTES-15 MIN I PRESSURE 3500 PSI,30 MIN PRESSURE 3500 PSI.-0 PSI BLEED OFF DURING 30 MINUTES. -BLEED DOWN CASING TO 0 PSI. `TEST APPROVED BY BP ACTING WTL STEVE ROSSBERG. 08:30 - 10:00 1.50 CASING P DECOMP RIG DOWN CEMENT EQUIPMENT. -VOID 7 CASING OF FLUID TO GROUND LEVEL TO CUT CASING. 10:00 - 13:00 3.00 CASING P DECOMP I NIPPLE DOWN BOP STACK. -PJSM,RIG UP AND SET 7"EMERGENCY CASING SLIPS. 'NOTICE SENT AOGCC OF BOP TEST AT 1130 FIRS BY BP WSL MIKE ALEXANDER. 13:00 - 14:00 1.00 CUT P DECOMP I CUT 7"CASING WITH WACHS CUTTER. -PJSM,SET UP WACHS CUTTER ON 7" CASING AND CUT CASING. -STAND BACK BOP STACK ON PEDESTAL. 14:00 - 18:30 4.50 WHSUR P DECOMP INSTALL TUBING SPOOL. -PJSM,LAY DOWN SPACER SPOOL. -PULLADAPTER FLANGE,CAMERON HANDS DRESS UP 7"CASING CUT. -INSTALL UPPER TUBING SPOOL AND TEST HANGER VOID. I-TEST TO 250 LOW FOR 5 MINS/3500 HIGH FOR 30 MINS.CHARTED BOTH TEST. *BOP TEST WITNESS WAIVED BY AOGCC REP LOU GRIMALDI AT 1828 HRS. Printed 6/17/2013 9:27:06AM North America-ALASKA-BP Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time.11/3/1979 12:00:00AM Rig Release.6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 C374.10usft(above Mean Sea Level) Date From-To Firs ■ Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 23:30 5.00 BOPSUR P DECOMP NIPPLE UP BOP STACK CHANGE OUT RAMS. -PJSM,NIPPLE UP BOP STACK ON SPACER SPOOL. -INSTALL SECOND IA VALVE ON UPPER TUBING SPOOL. INSTALL TURN BUCKLES,PITCHER NIPPLE AND FLOW RISER. -CHANGED OUT LOWER RAMS TO 2-7/8"X 5" -CHANGED OUT UPPER RAMS TO 3.5"X 6". 23:30 - 00:00 0.50 BOPSUR P DECOMP RIG UP FOR BOP TEST. -CLEAR CELLAR OF VALVES AND RAMS. -MAKE UP FOSV,DART VALVE WITH XO TO 4.5"FOSV FOR BOP TEST. 6/2/2013 00:00 - 01:30 1.50 BOPSUR P DECOMP BOPE TEST. -INSTALL RISER. -RIG UP TEST LINES. -RIG UP CHART RECORDER. 01:30 - 02:30 1.00 BOPSUR P DECOMP BOPE TEST. -HOLD BOP DRILL. -TEST GASBUSTER FILL. *TOOK 6BBL TO FILL GASBUSTER -BODY TEST BOPS AND CHOKE. '*RETIGHTEN FLANGE BETWEEN TUBING }SPOOL AND ADAPTER FLANGE. 02:30 - 09:00 6.`0 BOPSUI P DECOMP BOPE TEST. -TEST BOPE TO 250 PSI.LOW,3500 PSI HIGH FOR 5 MINS EACH. -TEST WITH 4"AND 4.5"TEST JOINTS. -ALL TEST CHARTED,SEE ATTACHED BOP TEST CHARTS. *TEST WITNESS WAIVED BY AOGCC REP. LOU GRIMALDI 09:00 - 11:00 2.00 BOPSUR P DECOMP BOP TEST RIG DOWN. -PJSM,RIG DOWN BOP TEST EQUIPMENT. -INSTALL BAILS. -M/U SAFETY JOINT. BLOW DOWN CHOKE AND KILL LINE. -MOBILIZE 7"DRILLASSY BHA TO RIG FLOOR. 11:00 - 17:30 6.50 BOPSUR N RREP DECOMP ACCUMULATOR VALVE REPAIR. -REBUILT TWO FOUR WAY VALVES AND TESTED. 17:30 - 18:00 0.50 BOPSUR N RREP _ DECOMP BOP TEST. -ACCUMULATOR DRAW DOWN TEST. 18:00 - 20:00 2.00 CLEAN P DECOMP HANDLE 7"DRILL OUT BHA. -M/U 6"JUNK MILL,BOOT BASKETS,STRING MILL,BUMPER SUB,OIL JARS,PUMP OUT SUB,AND 9 4-3/4"DC. -RIM T/322'. 20:00 - 00:00 4.00 CLEAN P DECOMP RUN IN HOLE WITH 7"DRILL OUT BHA.FROM 322'TO 8935' -RIM ON ELEVATORS WITH STANDS OF 4"DP FROM 322'-9718' -RIH ON ELEVATORS PICKING UP 4"DRILL PIPE FROM PIPE SHED FROM 9718'TO 8488' -RIH ON ELEVATOR WITH STANDS OF 4"DP FROM 8488'TO 8935' *TAG HARD SPOT AT 8935' Printed 6/17/2013 9:27:06AM North America-ALASKA B tiVa s Operation Summary Report= �� Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase � Description of Operations (hr) (usft) 6/3/2013 00:00 - 02:00 2.00 CLEAN P DECOMP CONTROL DRILL OUT 7'SHOE TRACK. -ESTABLISH PARAMETERS: PUW=210K,SOW=155K,ROT=172K,BPM= 8,PSI OFF=2290,PSI ON=1420,RPM=80, TORQ OFF=5K,TORQ ON=7K, WOB= 5-10K. -SLOW PUMP RATES AT 8927'W/8.5 SEAWATER. MP#1-20 SPM=130 PSI.,30 SPM=240 PSI. MP#2-20 SPM=130 PSI.,30 SPM=230 PSI. -REAM IN HOLE F/8935',T/8986'. 02.00 - 02:30 0.50 CLEAN P DECOMP MILL 7"CSG FLOAT AND PLUG FROM 8987'TO 9001'. -8 BPM,1430 PSI ON,1300 PSI OFF -80 RPM,5-7K TORQUE ON,5K TORQUE OFF. *PUMP 20 BBL HI VIS SWEEP AT 9001, OBSERVED RUBBER AND CEMENT FINES AT SWEEP TO SURFACE. 02:30 - 08:30 6.00 CLEAN P DECOMP WASH REAM FROM 9001'TO 9600' -WASH REAM FROM 9001'TO HARD SPOT AT 9376' -MILL THRU HARD SPOT FROM 9376'TO 9470' *7-10K WOM,8-9K TORQUE ON. °-PUMP 20 BBL HI VIS SWEEP AT 9470' --WASH REAM FROM 9470'TO HARD SPOT AT 9526'. -MILL THRU HARD SPOT FROM 9526 TO 9550' *7-10K WOM,8-9K TORQUE ON. *CEMENT FINES AND RUBBER OBSERVED COMING ACROSS SHAKER AT SWEEP TO SURFACE -WASH REAM FROM 9550'TO HARD SPOT AT 9555'ESTIMATED TOP OF CEMENT CAP. -MILL THRU CEMENT AND SAND FROM 9396'- 9706' *7-10K WOM,8-9K TORQUE ON. 08:30 - 09:30 1.00 CLEAN P DECOMP PUMP HI-VIS SWEEP. -PUMP 8 BPM AT 1440 PSI.,80 RPM,TORQ= 5K. 09:30 - 10:00 0.50 CLEAN P DECOMP MILL INFLATABLE BRIDGE PLUG. -MILL IBP,FROM 9706'TO 9707'PUMP 8 BPM AT 1440 PSI.,80 RPM,TORQ=7-9K,WOB=5K. 10:00 - 10:30 0.50 CLEAN P DECOMP BULL HEAD. -LOST CIRCULATION AT 9707' -CLOSE ANNULAR,OPEN KILL LINE AND BULLHEAD 50 BBLS DOWN ANNULUS AND DRILL PIPE. -PUMP 6 BPM AT 30 PSI. 10:30 - 11:30 1.00 CLEAN P DECOMP RIH AND SCRAPE FOR RETAINER PLACEMENT. -FLOW CHECK WELL FOR 10 MINS.,WELL ON VACUUM. -OPEN ANNULAR PREVENTOR. -WASH AND REAM IN HOLE FROM 9707'TO 9900 -TAGGED BOTTOM AT 9900',PULL 5 STANDS AND RACK BACK. -BLOW DOWN TOP DRIVE AND KILL LINE. *HOLE FILL RATE OF 60 BPH. Printed 6/17/2013 9:27:06AM • s Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 15:00 3.50 CLEAN P DECOMP PULL OUT OF HOLE. -FLOW CHECK WELL FOR 10 MINS.,WELL ON VACUUM. -POOH F/9900',T/400' *MAINTAIN HOLE FILL RATE 60 BPH PLUS PIPE DISPLACEMENT. 15:00 - 16:00 1.00 CLEAN P DECOMP HANDLE 7"CLEAN OUT BHA. -PJSM,FLOW CHECK WELL FOR 10 MINS FOR NON-SHEARABLES ACROSS STACK WELL ON VACUUM. -DISENGAGE DRILL COLLARS AND L/D SINGLES TO PIPE SHED. -DISENGAGE JARS,BUMPER SUB,BOOT I BASKETS,BIT SUB,STRING MILLAND JUNK MILL. *MAINTAIN HOLE FILL RATE 60 BPH PLUS PIPE DISPLACEMENT. 16:00 - 17:00 1.00 CLEAN P DECOMP EMPTY BOOT BASKETS. -PJSM,EMPTY BOOT BASKETS OF DOWN I HOLE DEBRIS. — -CLEAR RIG FLOOR OF BAKER FISHING TOOLS. *MAINTAIN HOLE FILL RATE 60 BPH 17:00 - 18:00 1.00 CLEAN P DECOMP SERVICE VARCO IRON ROUGH NECK. '-LUBRICATE AND INSPECT ST-80 IRON ROUGH NECK. -CLEAN RIG FLOOR. *MAINTAIN HOLE FILL RATE 60 BPH 18:00 - 19:30 1.50 CLEAN P DECOMP I P/U CEMENT RETAINER AND RIH. -PJSM WITH HALLIBURTON REPS.ON 7" CEMENT RETAINER OPERATION. -M/U CEMENT RETAINER AND RIH,. -P/U 15 SINGLES FROM PIPE SHED TO 481'. *MAINTAIN HOLE FILL RATE 60 BPH 19:30 - 00:00 4.50 CLEAN P DECOMP IRIH ON 4"DRILL PIPE. -RIH WITH PIPE FROM DERRICK F/481',T/ 9690'. *MAINTAIN HOLE FILL RATE 60 BPH 6/4/2013 00:00 - 01:00 i 1.00 CEMT P DECOMP SET CEMENT RETAINER. -ESTABLISH PARAMETERS:PUW=220K, SOW=160K. I-PUMP 3 BPM AT 30 PSI.ACROSS SETTING DEPTH OF CEMENT RETAINER AT 9725'. -SET RETAINER AS PER HALLIBURTON REP. 35 TURNS TO THE RIGHT,PICKED UP OUT OF 1 RETAINER,TOOK 40K OVERPULL TO RELEASE.SET BACK DOWN 15K ON RETAINER,PICK UP 10 FT.AND TURNED 25 TIMES TO THE RIGHT,SET BACK DOWN 15K ON RETAINER. *CENTER OF PACKER ON RETAINER SET AT 9725' Printed 6/17/2013 9:27:06AM • ii," / f�//N" %� ;/ - /," ',p/ ce' 6l/0 f"-,7" ,,� ,,AP i / _/ /i ,,,; ,/,,1 Operation Summary Report :'�' Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 1 End Date:6/6/2013 X4 OOX7N-E:(4,045,000.00) 11 1 Project:Prudhoe Bay 1 Site:PB X Pad Rig Name/No.:DOYON 14 1 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From To Hrs Task Code 1 NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 01:00 - 02:30 1.50 CEMT P j t DECOMP OBTAIN INJECTION RATE INTO PERFORATIONS. -FILL ABOVE RETAINER WITH 8.5 SEAWATER AND ESTABLISHED A LOSS RATE OF 10 BPH. 1 'FLUID LEVEL PRIOR TO SETTING RETAINER I 'ESTIMATED TO BE AT+/-1600'CALCULATED 1 BY VOLUME TO FILL. i-PUMP 100 BBL DOWN 4"DP AT 6 BPM, PRESSURE CAME UP TO 570 PSI.TO ESTABLISH INJECTION RATE. 02:30 - 04:00 1.50 CEMT P 1 DECOMP I CEMENT SQUEEZE LOWER PERFORATIONS. -PJSM,FILL CEMENT LINES WITH WATER AND TEST,250 PSI LOW/4500 PSI HIGH FOR 5 CHARTED MINS EACH. -SLB PUMP 5 BBLS OF FRESH WATER AT 2 BPM AT 30 PSI. 11-SLB PUMP 45 BBLS OF 15.8 PPG CLASS G CEMENT AT 5 BPM. INITIAL CIRC PRESSURE 35 PSI,FINAL CIRC PRESSURE 570 PSI. -SLB DISPLACE WITH 104 BBLS OF 8.5 'SEAWATER AT 5 BPM IINITIAL CIRC PRESSURE 35 PSI,PRESSURE STARTS TO CLIMB AT 70 BBLS PUMPED TO 300 PSI,AT 80 BBLS PUMPED PRESSURE INCREASE TO 950.DROP PUMP RATE TO 4 BPM.FINAL CIRC PRESSURE AT 104 BBLS PUMPED 1100 PSI. -SLB STOP PUMPING,ALLOW DP PRESSURE TO DROP TO 500 PSI. -RAISE DRILL STRING 8' AND UNSTUNG FROM CEMENT RETAINER,GOOD INDICATION DP PSI DROPPED TO 0 PSI. `PUMPING ACROSS TOP WITH HOLE FILL PUMP TO KEEP ANNULUS FULL UNTIL UNSTUNG FROM RETAINER. 04:00 - 05:00 1 1.00 CEMT P DECOMP CIRCULATE OUT CEMENT ABOVE RETAINER. -PUMP 20 BBL OF 8.5 PPG SEAWATER AT 9 IBPM. -PUMP 30 BBL HI VIS SWEEP AT 9 BPM. -PUMP 8.5 PPG SEAWATER AT 9 BPM AT 1640 PSI UNTIL CEMENT RETURNS AND SWEEP i OUT OF HOLE. 05:00 - 06:00 1.00 CEMT P DECOMP 1 RIG DOWN CEMENT LINES AND POOH ON ELEVATORS 1-PJSM,RIG DOWN CEMENT LINES. -8.5 PPG SEAWATER IN AND OUT. -MONITOR WELL FOR 10 MINUTES,WELL ON 10 BPH STATIC LOSS. 1-POOH FROM 9718'TO 9693' *PUMPING ACROSS TOP WITH HOLE FILL PUMP TO KEEP ANNULUS FULL. 06:00 - 07:30 1.50 CEMT P I DECOMP SLIP AND CUT DRILLING LINE. `PUMPING ACROSS TOP WITH HOLE FILL PUMP TO KEEP ANNULUS FULL. 07:30 - 12:00 i 4.50 CEMT P 1 DECOMP PULL OUT OF HOLE O ELEVATORS. i -PJSM,POOH LAY DOWN SINGLES TO PIPE SHED FROM 9693'TO 5300'. 'KICK WHILE DRILL(D1)RESPONSE TIME= 2:25 MINS. Printed 6/17/2013 9:27:06AM • North America-ALASKA BF' ' Operation Summary Report F /7/'// Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) I Start Date:5/10/2013 I End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) L Project:Prudhoe Bay I Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To j Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) DECOMP 12:00 12:30 0.50 CEMT P RIG SERVICE. I-SERVICE VARCO ST-80 IRON ROUGH NECK AND DRAW WORKS. 12:30 - 16:30 4.00 CEMT P DECOMP PULL OUT OF HOLE ON ELEVATORS. -POOH LAY DOWN SINGLES TO PIPE SHED FROM 5300'TO 0' -FLOW CHECK WELL FOR 10 MINS.AT I NON-SHEARABLES ACROSS STACK WELL ON VACUUM. 16:30 - 17:00 0.50 CEMT P DECOMP CLEAR RIG FLOOR. I-LAY DOWN TOOLS NOT NEEDED FOR OPERATIONS. 17:00 - 18:30 1.50 WHSUR P DECOMP PULL WEAR BUSHING. -RIG UP BOP STACK WASHER,RIH FLUSH BOP STACK. � I 18:30 - 19:00 0.50 RUNCOM P RUNCMP DRY RUN HANGER. -PJSM,P/U LANDING JOINT AND MAKE UP CAMERON 11"X 4 1/2"TYPE H PROFILE j TUBING HANGER W/2 BLANKED OFF 1/4" CONTROL LINE PORTS. -MAKE DRY RUN W/HANGER,OBTAIN }MEASUREMENT -LAY DOWN LANDING ON LANDING JOINT AND JOINT.TUBING HANGER TO PIPE SHED. 19:00 - 21:00 2.00 RUNCOM P RUNCMP I RIG UP COMPLETION EQUIPMENT. -PJSM,L/D SHORT BALES,INSTALL LONG BALES. -INSTALL COMPENSATOR ON TOP DRIVE. -PICK DOUBLE STACK CASING TONGS,SLIPS, ELEVATORS AND SINGLE JOINT ELEVATORS, I XO FOR SAFETY VALVES. 21:00 00:00 3.00 RUNCOM P _ RUNCMP RUN 4.5 12.6#PPF 13CR-85 VAMTOP TUBING. -PJSM W/DOYON CASING REP.AND HALLIBURTON REPS.ON RUNNING I COMPLETION. - WE Y"X GUI , , HES M/U X-NIPPLEIRELIN,HES ENTR 7 4.5DE"TNT XN-NIPPLE PACKER, X-NIPPLE. -RUN IN HOLE TO 580'. *ALL CONNECTIONS MADE UP USING TORQUE TURN TO 4440 FT/LBS *ALL CONNECTIONS BELOW TNT PACKER BAKER LOC'D *JET LUBE SEAL GUARD USED ON ALL I CONNECTIONS ABOVE TNT PACKER. 6/5/2013 00:00 - 09:00 9.00 RUNCOM P RUNCMP I RUN 4.5 12.6#PPF 13CR-85 VAM TOP TUBING COMPLETION. -RUN COMPLETION F/580',T/5,300'. '*USE STABBING GUIDE AND COMPENSATOR TO RUN PIPE. *ALL CONNECTIONS MADE UP USING TORQUE TURN TO 4440 FT/LBS. *ALL CONNECTIONS BELOW TNT PACKER BAKER LOC'D. *JET LOBE SEAL GUARD ABOVE TN UD AL CONNECTIONS TS E PACKER.ON L 09:00 - 10:00 1.00 RUNCOM N RREP RUNCMP PIPE HANDLING EQUIPMENT REPAIR. INSPECT AND REPLACED PIPE SKATE BACK STOP KEEPER PIN THAT ATTACHES TO THE DRIVE CHAIN. -TEST AND RETURN SKATE TO OPERATION. Printed 6/17/2013 9:27:06AM • North America-ALASKA BP 44 Operation Summary Report Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 1X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/me:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor:DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 15:30 5.50 RUNCOM P RUNCMP RUN 4.5 12.6#PPF 13CR-85 VAM TOP TUBING COMPLETION. -RIH F/5300',P/U PUP JOINTS AND LANDING JOINT W/HANGER. -LAND WITH WLEG AT 9054'. -FINAL PARAMETERS:PUW=161K,SOW= 130K. -RUN IN LOCK DOWN SCREWS. 15:30 - 18:00 2.50 RUNCOM P RUNCMP 'REVERSE CIRCULATE COMPLETION FLUIDS. -RIG UP IAANNULUS,PUMP 150 BBLS OF 120 DEG.SEA WATER FOLLOWED BY 180 BBLS OF 120 DEG. SEAWATER W/CORROSION INHIBITOR,PUMP 3 BPM AT 240 PSI. 18:00 - 21:00 3.00 RUNCOM P RUNCMP SET PACKER,TEST TUBING AND CASING. -DROP BALL AND ROD. !-REMOVE LANDING JOINT. !-CLOSE BLIND/SHEARS. -PUMP DOWN TUBING THROUGH KILL LINE TO SET 7"X 4.5"TNT PACKER WITH 120 DEG. SEAWATER. -SHUT DOWN PUMP AT 250 PSI AND HOLD PRESSURE FOR 5 MINUTES. -PUMP DOWN TUBING THROUGH KILL LINE AT 3 SPM.AT 1500 PSI TNT PACKER STARTS TO SET,AT 2000 PSI FULLY SET. -PUMP AT 3 SPM UNTIL PRESSURE REACHES 3800 PSI.2 BBL PUMPED -STOP PUMP AND PERFORM 4.5"TUBING MIT FOR 30 CHARTED MINUTES.PRESSURE DROPPED 25 PSI FIRST 15 MINUTES,0 PSI SECOND 15 MINUTES-PASS. -BLEED OFF TUBING PRESSURE TO 1500 PSI. 1 BBL BLED OFF -PUMP DOWN IA UNTIL PRESSURE REACHES 3800 PSI.4 BBLS PUMPED -STOP PUMP AND PERFORM 4.5"X 7"MIT FOR 30 CHARTED MINUTES.PRESSURE DROPPED 25 PSI FIRST 15 MINUTES,0 PSI SECOND 15 MINUTES-PASS. -CALL WTLAND DISCUSS TEST RESULTS. GIVEN PERMISSION TO PROCEED WITH WELL PLAN. -BLEED OFF PRESSURE FROM 4.5"TUBING TO SHEAR DCR VALVE.DCR VALVE SHEARED WHEN TUBING PRESSURE DROPS PAST 1000 PSI. -PUMP TO VERIFY DCR VALVE SHEAR.PUMP 5 BBLS AT 3 BPM AT 150 PSI DOWN IA TAKING RETURNS THROUGH KILL LINE,PUMP 5 BBLS AT 1.5 BBL MINUTE DOWN TUBING TAKING RETURNS THROUGH IA AT 1500 PSI. 'CENTER OF HES TNT PACKER IS SET AT 8890.33'. 21:00 - 22:30 1.50 BOPSUR P WHDTRE SET TWC,TEST FROM BELOW THEN ABOVE. -FLOW CHECK WELL FOR 10 MINS,WELL STATIC. -PJSM,INSTALL TWC. -R/U AND TEST TWC FROM BELOW AT 1000 PSI./ABOVE TO 3500 PSI FOR 10 CHARTED MINS. Printed 6/17/2013 9:27:06AM ` North America-ALASKA BP , Operation Summary Report r, Common Well Name:X-02 AFE No Event Type:WORKOVER(WO) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud DateTme:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00 @74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 RUNCOM P RUNCMP RIG DOWN TEST EQUIPMENT. -PJSM,VOID STACK OF FLUIDS. -BLOW DOWN CHOKE,KILL LINES AND CHOKE MANIFOLD. -LAY DOWN LONG BALES,BREAK APART SAFETY JOINT. 6/6/2013 00:00 - 03:00 3.00 BOPSUR P WHDTRE NIPPLE DOWN BOP. -PJSM,NIPPLE DOWN STACK,STAND BACK ON PEDESTAL. *BARRIERS ARE BALL AND ROD,KWF, PRESSURE TESTED TWC. *MONITOR IA. 03:00 - 04:30 1.50 WHSUR P WHDTRE NIPPLE UR,TREE. -PJSM,NIPPLE UP 4-1/16"X 11"ADAPTOR 'FLANGE AND 4-1/16"TREE. MONITOR I/A. 04:30 - 06:00 1.50 WHSUR P WHDTRE TEST TUBING HANGER VOID. -PJSM,WITH CAMERON REPS.ON TESTING VOID AND TREE. -TEST TUBING HANGER VOID AND SEALS TO 5000 PSI FOR 30 CHARTED MINS EACH. *SPILL DRILL *MONITOR IA. 06:00 07:00 1.00- WHSUR P WHDTRE PRESSURE TEST TREE. ® -TEST TREE TO 250 PSI LOW/5000 PSI HIGH FOR 5 CHARTED MINS EACH. 07:00 - 09:00 2.00 WHSUR, P WHDTRE PULL TWO WAY CHECK -P/U LUBRICATOR AND TEST. TEST TO 250 PSI.LOW/3000 PSI.HIGH FOR 5 CHARTED MINS EACH. -PULL TWC. 09:00 - 11:00 2.00 WHSUR P WHDTRE RIG UP LITTLE RED SERVICES. -PJSM,FLUID PACK LRS LINES AND PRESSURE TEST. TEST TO 3500 PSI FOR 5 MINS. -START REVERSE CIRCULATING 84 BBLS OF DIESEL FREEZE PROTECT. 11:00 - 14:00 3.00 WHSUR P WHDTRE FREEZE PROTECT WELL WNTH 80 DEGREE DIESEL. -LRS PUMP DIESEL,2 BPM AT 1900 PSI. INITIAL CIRC PRESSURE. -LRS REDUCE PUMP RATE DUE TO INCREASING PRESSURE.AT 44 BBLS PUMPED PRESSURE REACHED 2950 AT 0.25 BBL/MIN. -LRS STOP PUMPING AT 45 BBL PUMPED DUE TO HIGH PUMP PRESSURE. -LRS PUMP 40 BBL OF DIESEL KEEPING PRESSURE BELOW 3000 PSI. *BLED OF IA TO TUBING TO SURGE PRESSURE THROUGH DCR VALVE 4 TIMES DURING CIRCULATION TO CLEAR TRASH FROM DCR PORTS. -LRS SHUT OFF PUMPS,SHUT IN WELL. *TOTAL OF 85 BBL OF 80 DEGREE DIESEL PUMPED DOWN IA. Printed 6/17/2013 9:27:06AM i North America-ALASKA Operation Summary Report`' Common Well Name:X-02 AFE No Event Type:WORKOVER( 1o) Start Date:5/10/2013 End Date:6/6/2013 X4-00X7N-E:(4,045,000.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:DOYON 14 Spud Date/Time:11/3/1979 12:00:00AM Rig Release:6/6/2013 Rig Contractor.DOYON DRILLING INC. UWI: Active datum:2:02 11/3/1979 00:00©74.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 15:30 1.50 WHSUR P WHOTRE U-TUBE FREEZE PROTECT. -LINE UP FOR IA,TUBING U-TUBE. -ALLOW WELL BORE FLUIDS TO U-TUBE FOR 1 HOUR. -1300 PSI REMAINED ON TUBING AND IA, BLEED OFF BOTH TO ROCK WASHER,TOTAL 5 BBLS BLED. �TUBING AND IA PRESSURE AT 0 PSI AFTER BLEEDOFF. 15.30 - 18:00 2.50 WHSUR P WHDTRE 'TEST LUBRICATOR,INSTALL BACK PRESSURE VALVE. -PJSM W/DRILL SITE MAINTENANCE ON INSTALLING AND TESTING LUBRICATOR. -PRESSURE TEST LUBRICATOR TO 250 PSI. LOW/3500 PSI.HIGH FOR 5 CHARTED MINS. -INSTALL BPV. 18:00 - 19:30 1.50 WHSUR P j WHDTRE TEST BACK PRESSURE VALVE. -PRESSURE TEST LRS LINES TO 3500 PSI. -PRESSURE TEST BPV FROM BELOWAT 1000 PSI.FOR 5 MINS. 19:30 - 22:00 2.50 WHSUR P WHDTRE SECURE TREE,CLEAN CELLAR. -PJSM,SECURE TREE IN CELLAR. -REMOVE PUMP IN SUB,RIG DOWN 1502 ";,FLANGES OFF IA AND OA. -INSTALL FLANGES FOR NEEDLE VALVES. SIM-OPS:RELOCATE BREAK TRAILER,MOVE ARCTIC GRADE FUEL TRAILER AND ROCK WASHER TO DS2. 22:00 - 23:00 1.00 WHSUR '. P WHDTRE SKID RIG FLOOR. -PJSM,SKID RIG FLOOR INTO MOVE POSITION. 23:00 - 23:59 0.98 WHSUR--_- P WHDTRE MOVE OFF WELL X-02. -PJSM,MOVE RIG OFF WELL X-02. *PAD OPERATOR INSPECTED TREE, WITNESS RIG MOVING OFF WELL. "OAAND IA PRESSURE=0 PSI. "'RIG RELEASED AT 23:59 6-6-2013. Printed 6/17/2013 9:27.06AM .1.. TREE= 6"CNV • 'WELLI-EAD= MCEVOY SAFI/NOTES: 4-1/2"CHROME TBG*" ACTUATOR- — - - ------ aBS PJC DRAFT X ()2 NTIAL KB ELEV-, 74.1' BF ELE1/= 39.5i. _____J iliii ,*: I fil - ---- --- -- -,,_ P,4 1., 2106' 14-m-I-ES X NP ID=3.813- 1 KOP= 3200* 20"x 30" -1 -110' PIP r,i ___ _ _ Max Angle= 39"@ 6400' 1,1=Am') N I %. pi, Datum ND= 9853' pio lip CONDUCTOR,ID=? P.I...4• Ila 2610' 1-19-5/8"ES CEMENTER Datum TV D= 8800'SS . am MI =MB EMI 19-5/8"CSG,47#.1-80 HY DRIL 563 XO TO BTC H 2489' r 2532' H9-518"EXTERNAL CASING PKR GAS LFT MANORS . 9-5/8"CSG,47#,L-80 BTC,ID=8 681- - 2557' ST ND TVD DEV 'NM, VLV t----r--------LATCH PORT DATE 13-318"CSG,72#,L-80 BUTT,D=12.347" H 2689' n 1 5 3752 3734 18 1002 DONE BK 16 07/01)13 4 5981 5604 38 KBG2 SO BK 20 07/01/13 CEMENT IN 9-5/8"X 7"(XX(XYJ13) -1 8500' I ii .„,7 ri 3 7262 6615 36 KBG2 DM' BK 0 06/04113 I, 2 8167 7366 31 KBG2 DM' BK 0 06/04/13 h." rit 1 8782 7904 27 KBG2 DMY BK 0 06/04/13 Minimum ID = 3.725" @ 9032' i • 1 ,0 70' I 8853 -14-112"HES X NF,ID=3.813- 4-1/2" HES XN NIPPLE I. 14 8887' Hr X 4-1/2"HES TNT PKR,13=385& 1 r TEBACK Liii,26",1-80 VAM TOP I-IC, -1 8948' 1 X0 TO L-80 BTC-M 61 gi I I :* L 8922' L 1 4-112'HES X NP,13=3.813' . lei ■t-i 1 7-TEBACK UsER,26#,L-80 BTC-M -I 9010' * te 9032" H4-1/2"HES XN14:1,D=3.725- .0383 W,ID=6,276- . 0 ii [TOP OF 7"LNR 9009' ri i L 9052' 1-14-1/2`FLUTED WLEG,0=4.00- 1 4-1/2"TBG,12.6#,13CR-85 VAM TOP, 9043! -1ELIVD NOT LOGGED 0152 bpf, ID=3958' 9-5/8"CSG,47#,1-80 BUTT,ID=8.681" -1 9514' I & II 9725' HTOP OF CEMENT(06/04/13) 1 tol te‘el 1.4 i P...eV PERFORATION SUNSARY '`-":1"-16 9811' ---1r MARKER JOINT REF LOG:SOS BHCS ON 11/21/79 ANGLEAT TOP FERF:26°@9650' Note:Refer to Production DB for historleal perf data I 9930' --IFISH-EP DE3RIS(XX/XX/XX) SIZE SPF triERVAL OpniSqz SHOT SQZ 3-3/8- 6 9650-9678 0 01/18/92 4=6. 1 99:3380.* 1--147:1012TIS.OTIS X I 2-7/T 4 9768-9833 S 10/19/85 06/08/99 ID=3.813" • L 3-3/8- 4 9825-9853 S 08/17/92 06/08/99 MI Ix 1' 4-1 12''OTIS XN NP ID=3.725" L 994 I-I , 3-3/8" 4 98549860 S 01/10/92 06/08/99 9941' H4-1/2.XXN RUG' 2-70 4 9861-9877 S 01/10/92 06/08/99 3-3/8" 4 9875-9905 S 01/10/92 06/08/99 lr" 1 9943' -4-1/2"MEG,ID=3.958" 2-7/8" 4 9877-9880 S 01/10/92 06/08/99 2-7/8" 4 9911-9914 S 03/18/90 06/08199 3-3/8- 6 9915-9925 $ 09/15/93 06/08/99 2-7/8- 4 99449965 S 03/18/90 06/08/99 MID -1 10397' I +....+4 4 ....... 7"LNR,29#,L-80 BUrT0371 bpf,D=6.184" H 10482' 14.4.4.......14 i DATE RE/BY COMMENTS 1 DATE REV BY CONTIENTS FRUDFDE BAY MIT 11/26/79 11111AL COMPLETION 07/02/13 JI4J PJC CENENT FETAMER(06/04/13) WELL X-02 11111/84 N18E RN° 07/02/13 STF/PJC GLV CIO(07(01/13) FIERNIT No:r1790690 06106113 0-14 RiVO AR No: 50-029-20397-00 06/09/13 PJC DRLG I-10 CORRECTION SEC 8,T1 ON,R14E 296'RC&383 FVVL 06/10/13 PJC DRLG DRAFT ODRRECTION 06/11/13 DJ/PJC CMT/SAIND REMOVE) I. BP Exploration(Alaska) Ferguson, Victoria L (DOA) From: Ferguson, Victoria L (DOA) Sent: Wednesday, May 22, 2013 3:07 PM To: 'Johnson, David A (Swift)' Subject: RE: Revision to X -02 (PTD 179 -069) Sundry 313 -103 Dave, You have approval to proceed as outlined below. Please resend the wellbore schematic; the one sent was unreadable. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave, Ste 100 Anchorage, AK 99501 SCANNED JUN 14 2013 Work: (907)793 -1247 victoria.ferguson aC�.alaska.gov From: Johnson, David A (Swift) [mailto:David.A.Johnson @bp.com] Sent: Wednesday, May 22, 2013 1:44 PM To: Ferguson, Victoria L (DOA) Subject: Revision to X -02 Sundry 313 -103 Victoria, Doyon 14 is currently on well X -02 performing a 9 -5/8" tie -back. Reference Sundry 313 -103. The 9 -5/8" casing was cut and while establishing circulating to circulate out Artic -Pack, communication was established to the 13 -3/8" casing shoe. After completing the 9 -5/8" tie -back, we are planning to run a 7" tieback from the top of the existing liner at 9008' to surface. This will isolate the 9 -5/8" casing patch which could have communication to the surface casing shoe. The bottom 500' of the tieback will be cemented. The 7" tieback will be 7" 26# L -80 VamTop. I have attached a revised casing repair schematic for your review. An outline of the revised procedure is below. There is no change to the planned tubing configuration. Regards, Dave Remaining Work: 1. Pull 9 -5/8" casing through the stack. 1 2. Scrape 13 -3/8" and dress -off 93/8" casing stub • 3. ND BOPs. Remove 13 -3/8" casing head 4. Run 9 -5/8" 47# L -80 Hydril 563 tie -back fully cemented to surface with 15.8 ppg class G cement. Cut is at approximately 2546' MD, 5. Install 9 -5/8" casing head & tubing spool. NU BOPs. 6. Drill out the 9 -5/8" shoe track and test casing to 3,500 psi. 7. Wash sand off 9 -5/8" RBP and retrieve RBP. 8. Run 7" long string to the tie -back sleeve and cement bottom 500'. 9. Split BOPE and install the 7" slips / pack -off. NU & test BOPS 10. Drill out 7" shoe track and sand / cement IBP's. Clean out 7" liner to —9,930' PBTD 11. Run & set 7" cement retainer at — 9725 ". 12. Establish injection into abandoned perforations and cement squeeze with 15.8 ppg class G cement. 13. Clean out welibore if necessary to top of 7" cement retainer. 14. Run new 4.5" 13Cr completion with 9 -5/8" x 4 -1/2" HES TNT packer. MIT -T & MIT -IA to 3500 psi. 15. Seta BPV and RDMO. Please let me know if the state approves the revision of the X -02 Sundry. David Johnson BP Workovers Office: 907 - 564 -4171 Cell: 907 - 632 -5806 Fax: 907 - 564 -4046 «X -02 Casing Repair2.pdf» 2 • TREE= 4 -1/16" CNV • X -02 9 -5/8 !! Casing Repair KB. BLEV = 67.91' BF. t .EV = 39.51' 1 I 9-5/8" Slip -Lock Wellhead KOP= 3200' Max Angle = ° 9 -5/8" 47# L -80 Hydril 563 in Datum ND = 9 -5/8" ES Cementer OdtumTVD= 8800' SS r` 9 -5/8" ECP & Casing Patch I 13 -3/8" CSG, 72#, L -80, D = 12.347" H 2689' 1 IL I 7' 26# 1-80 VamTop HC I I Top of Cement H 8500' I .y 4 , 4 I TOP OF 7" Lt• H 9009' I I 9-5/8" CSG, 47 #, L -80, D = 8.681" H 9514' PERFORATION SUMWIRY RIf LOG: SOS BHCS ON 11/21179 I 9725' HCIEMENT RETAINER I T•r•r• ANGLE AT TOP PERF: 26° @ 9650' .t..7:::::;.1.10070 i 9816' H Iyy, RICER JOIN(' I r•r�t+r•r• Note: Refer to Production DB for historical perf data ...•..•.••.••.•ti • r••r•r•r• C3 1'41T 1i f SUE SW INTERVAL VAL Opn/Sgz SHOT SQZ %.........%.%.... ''` '5, f•. ' 1,• 3-3/8" ' 6 9650 -9678 C 01/18/92 •r•r•r•r•r•. 2 -7/8" 4 9768 -9833 S 10/19/85 06/08/99 FROM NLL ® 16PS ETC I 33/8° 4 9825 -9853 S 08/17/92 06/08/99 3-3/8" 4 9854 -9860 S 01/10/92 06/08/99 ►r� ►�4 I 9930' Hr OTIS WO PKR I 2 -7/8" 4 9861 -9877 S 01/10/92 06/08/99 3-3/8" 4 9875.9905 S 01/10/92 06/08/99 I 9938• —141/2 OTIS X NP, ID= 3.813" I 2 -7/8" 4 9877 -9880 S 01/10/92 06108/99 D = 3.725" 1 2 7/8" 4 9911 -9914 S 03/18/90 06/08/99 9941' I--I a 1!2" OTIS XN NP 3-3/8" 6 9915 -9925 S 09/15/93 06/08/99 9941' I °{4 - 1/2" xxNPLUG I 2 -7/8" 4 9944 -9965 S 03/18/90 06/08/99 1 99 H4-1(2" vVLEG, 13= 3.958" I I PBTD H 10397' I 4',1 114/4111 4.441444 17" LNR, 29 #, L - 80, 0.0371 bpf, ID = 6.184" H 10452' .4.4.4.44.44.4, DATE REV BY COW/MINTS PRUDHOE BAY UNIT DATE REV BY COMuFNTS 1117179 ORIGINAL COMPLETION 08/05/11 G.1131 RN' SET PX PLUG (7/9/11) WELL: X-02 1 X 0-02 0690 11/11/84 RWO 10/22/12 CDJ/JtuD FULL & PL PX PLUG (09/29/12) API No: 1 7-0 6 9- 20397 -00 07/21 -25/99 JDNV/TLP SET BP/CMT CAP -ADD 12/03 12/14/12 JGLJJND SET SAND/CMr CAP (12/10/12) SEC 8, T10N, 874E 0 0 9- 2 & 383' FWL /02!02 RN/TP CORRECTIONS 07/13/02 JC/KAK PERF CORRECTIONS BP Exploration (Alaska) 08/03/05 DAV/PJC GLV GO • • • w �� \ s9 THE STATE Alaska Oil and Gas _ i�� °fA LASKA Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue Off, r h �2. ' MAR 2 . 2013 Anchora Alaska 99501 -3572 ALAS SCANNED Main: 907.279.1433 Fax: 907.276.7542 David Reem Engineering Team Leader 131 BP Exploration (Alaska), Inc. , P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X -02 Sundry Number: 313 -103 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P . Foerster elly Chair DATED this of March, 2013. Encl. EWE D STATE OF ALASKA r�� ITC �• a ALA. OIL AND GAS CONSERVATION COMM ION A 9 M r S ? APPLICATION FOR SUNDRY APPROVAL ��_r ((� 20 AAC 25.280 1. Type of Request: AOGCC ❑ Abandon ❑ Plug for Redrill ❑ Perforate New Pool ® Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ® Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ® Alter Casing ❑ Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic jA7 / --//6"--)6;)(7 - 3. Address: ® Development ❑ Service 6. API Numbe M) 2 ze i'Y P.O. Box 196612, Anchorage, Alaska 99519 -6612 50-029-20397-00-00 - 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU X -02 • Will planned perforations require a Spacing Exception? ❑ Yes No 9. Property Designatior 10. Field / Pool(s): ADL 028313 ' Prudhoe Bay / Prudhoe Bay • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured) 10460' ' 9442' 9 941,' 9713', 9555' (TOC) 10397' 9382' 9924', 9930' Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2689' 13 -3/8" 2689' 2689' 4930 2670 Intermediate 9514' 9 -5/8" 9514' 8567' 6870 4760 Production Liner 1443' 7" 9009' - 10452' 8107' - 9434' 8160 7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9650' - 9678' 8691' - 8716' 5-1/2", 17#x4-112", 12.6# L -80 8974' Packers and SSSV Type: 9 -5/8" x 5-1/2" BOT 3H Packer Packers and SSSV 8868' / 7980' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ❑ Stratigraphic ® Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation May 23, 2013 ® Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date ' ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG ❑ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Dave Johnson, 564 -4171 Printed Name: David Re Title: Engineering Team Leader Email: Davg @bp.com Signature: Phone: 564 - 5743 Date: Z _ 27 -gyp/ 3 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness � �� Sundry Number: ❑ Plug Integrity ' Er OP Test ❑ Mechanical Integrity Test ❑ Location Clearance t� ft t Other: Bo/0 7 L_ $7 7U ,3 J U P 5 I RBDMS � M� 2 1 2 1 ' Spacing Exception Required? ❑ Yes ❑ No Subsequent Form Required: !t 4 0 if / APPROVED BY Approved By: , . ' COMMISSIONER THE COMMISSION Date: 3 — - 3 Form 10 -403 .R • 0- Approved application is valid for 12 months from the date of approval Submit In Duplicate LO i, h r L 1,71,r- 3/15 7/3 " 2 v. 1. bp • • Sundry Request for casing repair Well: X -02 Date: 2/27/2013 Engineer: Dave Johnson MASP: 2320 psi Well Type: Producer Estimated Start date: May 23 2013 History: X -02 was drilled in November 1979 and began production in March 1980. The well was originally completed in the Sag, Z4, and Z3. The well produced for over a year with steadily increasing WC until it was SI in 1991 at 51 % WC. A PPROF identified the majority of the water was coming from Z3. In 1984, a RWO was completed to replace the tubing with 5 -1/2" gas lift compatible tubing and to isolate Z3 with a packer tail pipe. After the tail pipe was set, the WC did not decrease. It was suspected that water production was due to a fault plane at the base of the Z4 perfs which caused water influx from fault related overrunning of the HOT. A CBL indicated good cement from the perfs to the OWC, and a PITS did not identify a channel. In October 1985, Ivishak perfs were added from 9768' -9833' and 9854'- 9880'. This increased production from —1000 bopd, 60% WC to —10,000 bopd, 15% WC. Rates quickly stabilized to —4000 bopd, 60% WC. . In February 1989, Sag perforations were added from 9650 -9678' MD. These perforations did not improve rate. In December 1991, a GSO/WSO was attempted by squeezing all existing perforations, and reperforating from 9650 -9678' MD, 9854' -9860' MD, and 9875' -9905' MD. This squeeze and reperf job decreased production from —2000 bopd to —1000 bopd and increased WC from —75% to 90 %. In May 1994, a plug was set at 9750' to isolate the Ivishak and make X -02 a Sag only producer. This was based on a video log that showed the Ivishak to be making water and gas only. This dropped water cut to —40% and the oil rate remained the same. In 1997, the IBP failed. A second IBP was set, but this failed after only a few months. In 1998, a third IBP was set at 9740' MD. It was determined that this plug was leaking, and a cement cap was placed on top of the IBP in 1999. X -02 responded to multiple MI slugs from injectors X -24 and B -34 and held a steady production of —900 bopd, 80% WC until mid 2005. In 2005, oil production started declining rapidly while WC began increasing. It is speculated that the WC is caused from over injection in X -24Ai, the IBP at 9690' MD leaking, or faulting in the area bringing water to X -02. A recent tag indicated fill is above the only set of perforations open in the Sag. X -02 failed an MIT -OA with fluid to surface in the conductor pipe on 4/13/2010. The well was reclassified as Not Operable and SI. A recent caliper run has shown penetrations in excess of 97% in the 4 -1/2" tubing tail and the LLR has increase from .36 gpm to .54 bpm between the CMIT -TxIA in August 2011 to the MIT -T in April 2012. A sand plug was set from 9595' to 9690' and a cement plug set on top of the sand up to 9555', isolating all perforations. A CMIT -TXIA passed to 3000ps on February 6th, 2013 after setting the plugs. Scope of Work: Pull 5 -1/2" L -80 completion. Burn over & retrieve production packer. Cut and pull 9 -5/8" and run fully cemented 9 -5/8" tie -back to surface. Clean out cement. IBP & junk. Set 7" cement retainer @ —9725' and cement squeeze lower perforations. Run 4 -1/2" chrome completion. • • Pre Rig Prep Work: S 1 DGLV. Drift for 5 -1/2" Jet Cutter. E 2 Jet cut tubing @ 8,818'. Reference tubing tally 11/11/84. Cut desired to be in middle of 1st full joint above packer and seal assembly. F 3 Circulate well through the cut with sea water and diesel freeze protect to 500' MD. F 4 CMIT -TXIA to 3000 psi. (Passed 2/6/2013) W 5 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). PPPOT -T & IC. ✓ 6 Set TWC. Replace tree with dryhole tree ;Pull TWC set BPV. O 7 Remove the wellhouse, flow lines & floor kit O 8 Excavate the cellar as needed to get top of spray -in liner below the 13 -3/8" starting head. Line the cellar around the wellhead with impermeable, Rhino Tined Herculite. O 9 Shoot and level pad around well head and across pad. (75' x 130' ) O 10 The rig can be placed at an angle. If an ice extension is made, It should be covered w/ matting boards for insulation. Proposed RWO Procedure: 1. MIRU Doyon 14. ND tree. NU and test BOPE with four preventers configured top down 3 -1/2" x 6" VBR's, blind shears, mud cross' and 3 -1/2" x 6" VBR's. Test the VBR's, blind shears and annular to 3,500 psi_ 2. Pull and lay down tubing to the jet cut. 3. RIH & engage tubing stub with overshot. Release anchor & retrieve seals. 4. RIH with burnover shoe and spear. Burn over & retrieve BOT 3H packer at 8868'. 5. Test 9 -5/8" casing & 7" liner to 3000 psi. 6. Scrape 9 -5/8" casing to top of 7" liner at 9009'. 7. RU Wireline and run USIT log across 9 -5/8" to locate TOC inside 13 -3/8" casing. Note: Completion report states 130 cu.ft of cement pumped thru stage collar @ 2604' 8. Run and set RBP below desired 9 -5/8" cut. Dump 50' of sand on top of plug. 9. Swap upper VBR rams to 9 -5/8" fixed rams 10. Mechanically cut 9 -5/8" casing in 1 full joint above the TOC. Pull 9 -5/8" casing through the stack. 11. Scrape 13 -3/8" and dress -off 9 -5/8" casing stub 12. ND BOPs. Remove 13 -3/8" casing head 13. Run 9 -5/8" 47# L -80 Hydril 563 tie -back fully cemented to surface with 15.8 ppg class G cement. Y Y Assuming cut is at approximately 2150' MD, estimated volume is 125 BBLS 14. Install 9 -5/8" casing head. NU BOPs. 15. Drill out the 9 -5/8" shoe track and test casing to 3,500 psi. ✓ 16. Wash san off 9 -5/8" RBP and retrieve RBP. 17. Cleanout cement plugs, sand plugs and IBI3s in 7" liner to top of WD packer at 9930'. 18. Run & set 7" cement retainer at — 9725 ". ✓ 19. Establish injection into abandoned perforations and cement squeeze with 15.8 ppg class G cement. 20. Clean out wellbore if necessary to top of 7" cement retainer. 21. Run new 4.5" 13Cr completion with 9 -5/8" x 4 -1/2" HES TNT packer. MIT -T & MIT -IA to 3500 psi. 22. Set a BPV and RDMO. Post rig Work ✓ 1 Pull BPV S 2 Pull ball and rod, Set generic GL design, Pull RHC seat, T _ ` 6" CNV WELLHEAD = MCEVOY • X -0 2 CURRENf SAFETY NOTES: ACTUATOR = OTIS KB. ELEV = 67.91' BF. ELEV = 39.51' I KOP = 3200' Max Angle = 38° @6400' 2096' I — 5 -1/2" OTIS SSSV LAND NIP, ID = 4.562" I Datum MD = 9853' 0 GAS LIFT" MANDRELS DatumTVD= 8800' SS ST MD TVD DEV TYPE VLV LATCH FORT DATE 9 3227 3200 10 OTIS DMY RA 0 08/03/05 8 4984 4803 35 OTIS DMY RA 0 08/03/05 13 -3/8" CSG, 72 #, L -80, ID = 12.347" 2689' 7 6311 5862 38 OTIS DMY RA 0 11/11/84 6 7188 6567 37 OTIS DMY RA 0 11/11/84 5 7764 7031 34 OTIS DMY RA 0 11/11/84 4 8284 7465 31 OTIS DMY RA 0 11/11/84 Minimum ID = 3.813" @ 8942' 3 8435 7598 29 OTIS DMY RA 0 11/11/84 4 -1 /2" OTIS X NIPPLE 2 8577 7722 29 OTIS DMY RA 0 11/11/84 1 8718 7846 27 OTIS DMY RA 0 11 /11 /84 I 8782' I-5 -112" OTIS SLIDING SLEEVE, ID = 4.562" I � ` � 8844' _15 - /2" BOT FBR w /X PROFLER D = 3.813" I 5 -1/2" IPC TBG, 17 #, L -80, 0.0232 bpf, H 8879' ID = 4.892" 0t 1 M 1 I 8868' — 9 -5/8" X 5 -1/2" BOT 3H PKR, D = 3.813" I TOP OF 4 -1/2" TBG —I 8879' 8879' --I 5 -1/2" X 4 -1/2" XO 8942' 1_14 OTIS X NF', D = 3.813" 4 -1/2" TBG, 12.6 #, L -80 BUTT, .0152 bpf, rI 8974' ID = 3.958" 8974' —14-1/2" TBG TA L, D = 3.820" TOP OF 7" LNR —I 9009' I �1 I 8986' H ELMD TT LOGGED 12/02/89 I 9 -5/8" CSG, 47 #, L -80, D = 8.681" H 9514' 9555' I OF CEMENT CAP SET 12/10/12 iiimv 9595' I -TOP OF SAND SET 12 /10/12 PERFORATION SUMMARY r • I 9690' — TOP OF CEMENT CAP SET 07 /25/99 I 1.E RE LOG: SOS BHCS ON 11/21(79 9713' -BAKER DP SET 07/21/99 I ANGLE AT TOP PERF: 26 @ 9650' Note: Refer to Production DB for historical pert data ( 9816' I - )RKER 10■T SIZE SFF NTE2VAL Opn/Sqz SHOT SQZ 9924' — BKR 3 -3/8" 13P 3-3/8" 6 9650 -9678 C 01/18/92 2 -7/8" 4 9768 -9833 S 10/19/85 06/08/99 9930' -SEE TELEX DATA 03/01/92 - 03/02/92 3-3/8" 4 9825 -9853 S 08/17/92 06/08/99 3-3/8" 4 9854 -9860 S 01/10/92 06/08/99 QI ICI 9930' I -7" OTIS WD PKR I 2 -7/8" 4 9861 -9877 S 01/10/92 06/08/99 3-3/8" 4 9875 -9905 S 01/10/92 06/08/99 2 -7/8" 4 9877 -9880 S 01/10/92 06/08/99 9938' I—I4 -112" OTIS X NIP, D = 3.813" 2 -7/8" 4 9911 -9914 S 03/18/90 06/08/99 I 9941' I—I4 -1/2" OTIS XN NP, ID = 3.725" I 3-3/8" 6 9915 -9925 S 09/15/93 06/08/99 2 -7/8" 4 9944 -9965 S 03/18/90 06/08/99 I 9941' — I4 - 1/2" XXN PLUG 9943' I- 4 -1/2" WLEG, D = 3.958" I PBTD - 10397' ..1......... 1 7" LNR, 29 #, L -80, 0.0371 bpf, ID = 6.184" H 10452' .1.1 DATE REV BY COIV1VENTS DATE REV BY COMIE]VTS PRUDHOE BAY UNIT 11/ ?/79 ORIGINAL COMPLETION 08/05/11 GJB/ PJV SET PX PLUG (7/9/11) WELL: X -02 11/11/84 RWO 10/22/12 CDJ /JMD CORRECTIONS & PULL PX PLUG (09/29/12) PERMIT No: 1790690 07/21 -25/99 JDW(TLP SET 13P/CMT CAP -ADD 12/03 12/14/12 JGUJMD SET SAND/CMT CAP (12/10/12) API No: 50 -029- 20397 -00 01/02/02 RN/TP CORRECTIONS SEC 8, T1 ON, R14E, 296' FNL & 383' FWL 07/13/02 JC/KAK PERF CORRECTIONS 08/03/05 DAV /PJC GLV C/O BP Exploration (Alaska) WELLHEAD= 4-1/16 MCEVOY X A - 5/8 " Casing i a i r ACTUATOR= OTIS p KB. ELEV = 67.91' BF. ELEV = 39.51' r^ 9 - 5/8" Slip - Lock Wellhead KOP = 3200' Max Angle = 38° @ 6400' 9 - 5/8" 47# L - Hydril 563 Datum ND= 9853' : :: ... ___ ■ 9 - 5/8" ES Cementer Datum TVD= 8800'SS ;;; _/ 1 9 - 5/8" ECP & Casing Patch 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2689' I , sa , t ,,,4.- Z r `vrS I TOP OF 7" LNR H 9009' I I 9 -5/8" CSG, 47 #, L -80, D = 8.681" H 9514' 1 PERFORATION SUMMARY 0 ` op.E/J REF LOG: SOS BHCS ON 11/21/79 I 9725' — I CEMENT RETAINER ANGLE AT TOP PET: 26° @ 9650' •r•r r• ti• .0.0%0011 I 9816' H MARKER JOINT Note: Refer to Production DB for historical pert data 4,12".•::.V.:::::.. SIZE SPF INTERVAL n/ gZ SHOT SQZ r•r•r•r•r•r M� �' "'L "ti "'' "'' "ti" CEMENT "F' r•r•r•l•r•r 1•ti•ti•ti•ti•ti• 3-3/8" 6 9650 -9678 C 01/18/92 _ •r•r•r•r•r•� 2 -7/8" 4 9768 -9833 S 10/19/85 06/08/99 3-3/8" 4 9825-9853 S 08/17/92 06/08/99 41111r DEBRIS FROM MLLED DPS ETC 3-3/8" 4 9854 -9860 S 01/10/92 06/08/99 E I 9930' H7" OTIS WD PKR 2 -7/8" 4 9861 -9877 S 01/10/92 06/08/99 3-3/8" 4 9875 -9905 S 01/10/92 06/08/99 2 -7/8" 4 9877 -9880 S 01/10/92 06/08/99 I I I 9938' H4 -1/2" OTIS X NP, D= 3.813" 2 -7/8" 4 9911 -9914 S 03/18/90 06/08/99 L 9941' H4 -1/2" OTIS XN NIP, D = 3.725" 3-3/8" 6 9915 -9925 S 09/15/93 06/08/99 2 -7/8" 4 9944-9965 S 03/18/90 06/08/99 9941' — I 4 -1/2" XXN PLUG / \__ 9943' H4 -1/2" WLEG, D= 3.958" I I MID H 10397' ••••••• • 7" LNR, 29 #, L - 80, 0.0371 bpf, ID = 6.184" H 10452' 4•1•.•.•.......• DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 11/ ?/79 ORIGINAL COMPLETION 08/05/11 GJB/ PJV SET PX PLUG (7/9/11) WELL: X -02 11/11/84 RWO 10/22/12 CDJ /JND CORRECTIONS & PULL PX PLUG (09/29/12) PERMIT No: 1790690 07/21 -25/99 JDW/TLP SET DP/CMr CAP -ADD 12/03 12/14/12 JGUJND SET SAND/CMT CAP (12/10/12) API No: 50- 029 - 20397 -00 01/02/02 RN/TP CORRECTIONS SEC 8, T1 ON, R14E, 296' FNL & 383' FWL 07/13/02 JC/KAK PERF CORRECTIONS 08/03/05 DAV /PJC GLV C/O BP Exploration (Alaska) TREE= • 4 -1/16" CIW ACTUATOR = OTIS I -02 P R O P O S eb SAFETY NOTES: KB. ELEV = 67.91' BF. ELEV = 39.51' I I 9 - 5/8" Slip - Lock Wellhead KOP = 3200' Max Angle = 38° @ 6400' 9 -5/8" 47# L -80 Hydril 563 Datum MD= 9853' 4 -1/2" X Nipple @2100' DatumND= 8800'SS `•. 9 - 5/8" ES Cementer iik• 9 - 5/8" ECP & Casing Patch 13 -3/8" CSG, 72 #, L -80, K) = 12.347" --I 2689' ' GAS LET MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE ''II 6 TBD TBD TBD TBD SO TBD TBD 5 MD MD TBD MD DMY TBD MD �, , 4 4 TBD TBD TBD TBD DMY TBD TBD Minimum ID = 3.813 @ 8942 3 TBD TBD TBD TBD DMY TBD TBD 4 -1/2" OTIS X NIPPLE 2 TBD TBD TBD TBD DMY TBD TBD 1 TBD TBD TBD TBD DMY TBD TBD I4 - 1/2" TBG, 12.6 #, 13CR VamTop, 0.0152 bpf, AD = 3.958" I I I I 8900' _14 - 1/2" X NIPPLE, ID = 3.813" ® ®-I 8930' I 9 - 5/8" X 4 - 1/2" TNT PACKER I I I I 8970' _14 -1/2" X NIPPLE, ID = 3.813" I TOP OF 7" LNR —I 9009' j g / \ I 9010' I I4 - 1/2" WLEG, ID = 3.958" I 9 - 5/8" CSG, 47 #, L -80, ID = 8.681" H 9514' 4 PERFORATION SUMMARY El d PFA REF LOG: SOS BRCS ON 11/21/79 I 9725' —1 7" CEMENT RETAINER I ANGLE AT TOP PERF: 26° @ 9650' r•r•r• r•r•r•r•r• ' MARKER JOINT Note: Refer to Production DB for historical rf data r•r •r:•r: • 9816 {� ti .•ti jtiftif: : f: : fti: SIZE SFF IN Op n/ � ti SHOT SQZ ti r••ti• r ••L CEMENT � •r ti•ti 3-3/8" 6 9650 -9678 C 01/18/92 •r:r:r 2 -7/8" 4 9768 -9833 S 10/19/85 06/08/99 3-3/8" 4 9825-9853 S 08/17/92 06/08/99 FROM I&LED IBPS ETC I 3-3/8" 4 9854 -9860 S 01/10/92 06/08/99 I 9930' H7" OTIS WD PKR 2 -7/8" 4 9861 -9877 S 01/10/92 06/08/99 3-3/8" 4 9875 -9905 S 01/10/92 06/08/99 2 -7/8" 4 9877 -9880 S 01/10/92 06/08/99 I I I 9938' — L4 - 1/2" OTIS X NIP, ID = 3.813" 2 -7/8" 4 9911 -9914 S 03/18/90 06/08/99 9941' I— I4 -1/2" OTIS XN NIP, O = 3.725" 3-3/8" 6 9915 -9925 S 09/15/93 06/08/99 2 -7/8" 4 9944 -9965 S 03/18/90 06/08/99 9941' H4 -1/2" XXN PLUG / \ 9943' I— 4 -1/2" WLEG, ID = 3.958" PBTD — 10397' ••••••• • • 1 • 1 • 1 • 1 • 1 • 1 • • 7" LNR, 29 #, L - 80, 0.0371 bpf, ID = 6.184" H 10452' •...- 1.1.1.1.1.1. DATE REV BY COMIvENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/ ?R9 ORIGINAL COMPLETION 08/05/11 GJB/ PJV SET FX PLUG (7/9/11) WELL: X -02 11/11/84 RWO 10/22/12 CDJ /JMD CORRECTIONS & PULL PX PLUG (09/29/12) PERMIT No: 1790690 07/21 -25/99 JDW/TLP SET IBP/CMT CAP -ADD 12/03 12/14/12 JGL/JMD SET SAND/CMT CAP (12/10/12) Q 4f' - -14 -1/2" xxAF1 No: 50- 029 - 20397 -00 01/02/02 RN/TP CORRECTIONS SEC 8, T10N, R14E, 296' FNL & 383' FWL 07/13/02 JC/KAK PERF CORRECTIONS 08/03/05 DAV /PJC GLV CIO BP Exploration (Alaska) • • • re . CAMERON BP ALASKA WOA WELL X -02 REPLACEMENT EQUIPMENT _ F -- .- ....... MCEVOY 9-5/8 SLIPLOCK WITH 4-1/2 COMPLETION � 1 11— C o f \ 1 / 1 1 , r 10 _ 4 -118 5000 Tree �� • - -__ J ,1 '17; • o o . Tubing Head Adapter Cameron 11" API 5000 STDD Btm x 4 -1/8 Tubing Hanger API 5000 STDD Top. Prepped for two 1 s/4 ". [ _ ' s Cameron Type SA -RL Continuous Control Lines T _ - E\' v " rr 11 x 4 -1/2° TCII Box BTM x Top. a 4" Type H BPV Profile. Lowermost Casing Housing Prepped } ? \ Pre for 2 1/4:" Continuous Cameron 9 -5/8 SlipLock i 1 1--' ' Control Lines Bottom x 11" API 5000 Flange Top , o a� With two 2 -1/16 API 5000 SSO ? ,_ CANH Metal Seal bottom prep for 9 -5/8 Casing 9 -5/8° CANH Metal to Metal Seals 9 -5/8" Casing ` - 7 4 -1/2" Tubing WOA Well X-02 Replacement Equipment Slip Lock Casing Head Assembly Type S-3 9-5/8 Slip Lock BTM x 11" API 5K FLG Top With (1) 2-1/16 API 5K Manual Gate Valve, Companion Flanges and Bull Plugs Min Bore 8.88 PN 2263050-10-21 BP CAT ID 362336 'he SrLcc Casiria Hear vvii! be The Tubing Spool - WI! reed to issue a 5K Vaive with SiipLock to be instailec opposite the existrig annulus vaive esec prior to clstailation. Tubing Hanger Assembly "SA-SRL" 11" Bowl, 4-1/2" 12.6 lb. TC-ll Top & Btm. w/3.980 (4" Nom.) Type "H" BPV w/ two %" NPT continuous control Line Preps and 5-7/8" Nom SRL Seal Neck PN 2031940-15-01 BP CAT ID 362877 Tubing Head Adapter 11" 5K Btm. X 4-1/16" API 5K Top Std'd with 5-7/8" nom. SRL seal pocket and T Seal for 7" nom. Hanger Neck Btm w/ two continuous control line preps. Clad above Metal Seal Area and Flange Face Inlaid with 625 PN 2247222-05-01 BP CAT ID 362879 Tree: 4-1/8 5000 Carbon Tree PN 2012448-06 CAT ID 69517 • • e -- x ( s)-. / 5 e t McEvoy Conventional 2 Step CAMERON 0 - __mu TWO STEP BOWL 0.— 1 Tilia-rpot::- .=m...... a �. o o il 0 0 v. !,-3E°- - � � . i Imo' 0 HI, �� TWO STEP BOWL O O 0. d sa iii i � i il' � am p alg . _____ 0 1 . — oin ficerRISW -r Lir • FIG.1 CONVENTIONAL EQUIPMENT. McEvoy Conventional 2 Step.ppt Page 1 of 5 • WOA Well X-02 WELLHEAD EQUIPMENT Existing Wellhead equipment is McEvoy 2 Step Conventional. 12 x 7" IJ4S Box Top and Bottom (5) Neck Seal Hanger and Adapter with 7 -1/16 x 6 -3/8 bore Tree All existing equipment will be removed and replaced with a 9 -5/8 SlipLock System Casing Head: McEvoy Lower Type S -3. 13 -3/8 butt x 13 -5/8 5000 flange top with (2) SSO. Casing Hanger: McEvoy 12 x 9 -5/8 SB -3 Casing Slips with Primary Seal P.N. 270361- 00 -00 -05 CAT ID 67640 Secondary Pack -Off: McEvoy YB for 9 -5/8 Casing (In bottom of tubing spool) P.N. M539742 CAT ID 67920 Tubing Spool: McEvoy 2 Step Conventional. 13 -5/8 x 13 -5/8 5000 with (2) SSO. P.N. 2024062 -01 -01 CAT ID 67635 Tubing Hanger: McEvoy 2 Step (5) Seal Hgr. 12 x 7 IJ4S box top and bottom. 6 -3/8" Type J BPV Profile P.N. unknown CAT ID 67658. Tubing Head Adapter: McEvoy (5) Seal Adapter, 13 -5/8 x 7 -1/16" 5000. CAT ID 67885 Tree: 7 -1/16 x 6 -3/8 Bore 5000 CAT ID 69534 RIG FLOOR 33.7 ' AGL D 0021 i VALVE LEGEND 1if ©7©1 ©2 ©I0C©al I 1 BYPASS 2 KILL III p U :: 3 CHOKE iii 11' j 7 ■ 4 BOTTOM RAMS 1 1 5 BUND RAMS MINN R P 6 TOP PIPE RAMS II ACCUMULATOR: NL SHAFFER, 180 GAL, 6 STATION 7 ANNULAR u 5/e OP/ PS, MK ANNIAM °°°, TRIPI F% PUM 575 VAC, 30 HP WOODED TOP/Ft/NOM sorrow AIR PUMP: 1, NL SHAFFER • NO FLAMED TOP 0 0 0 •11111 Ill.. 13 5/0 5000 PS, 10• MPL OPERATORS. MK PPE RAM EIMEMERIZMECOMMEEDEMERCSUE 3 Ix. 5000 PSI SIN OUTLET 13 5/8-, 5000 PSI. tl IPL OPERATORS, t 3• CHOKE UNE 'MG e) F' MM IN BUM SHEAR RAY t : D .— BY PASS 51110000 BOTTOM BK 180 . 1st 3 IN 5000 PSI NCI VALVE — • 1500 3000 U' • VIII►VIII II 4II' r au jj1E 3 I/0 5000 P9 KR NEW' ... ! 1/0' 5000 PSI 0A1E V AK km 3 1 /8 5000 PS GTE YAK �� N.. •41�W. SINGLE 13 5/8 5000 PSI. 10 MPL 0000*T015. • + IONE PPE RAM mo000 BOTP5M/ 0000 85 150 ACCUMULATOR MANIFOLD smousw• ai i►R 41 18 BOTTLES, 10 GALLONS EACH IPA mow.. ir AA, ° . /', MI ROP STACK Fl FVATION t 3 REMOTE PANEL IN DOGHOUSE • AND lml TTY M00111 F bull III 1��Y� NITROGFN BACKUP BOTTLES S MINN 8 PSI, le 1 50 PS MDR. RASP HY BOP /ONQTIEP OPERATED KNIFE ON VALVE sm.. � moms MOM TOP/F1ANK.'FD BOTTOM ��N1�953I 1 • CT 00130 r•��� FMNCE/FlANOE RK 73 - - �La11[, - _._._.__ 1°n 1r nN'o VENT urn -- 01/11/00 1 Po TEA LvoE v SON PM OM1{AT A Pr LEA LONE OF► ST/01 14 �...r NAME P � BOP SYSTEM 01(3 M 3800 1/P P OOKOOL UM AND CONTROL 12.20.K.. 0 OM IBA UWE OVP mat 3I}7FACE DIVERTER CONFIGURATION 11_28_181 1 MN VA owe to MONO ' 2 8 /IU ° * ° LEA MO It TAT. Air. mN^RII — Nil 1 41a Fr"-' .. OO7 /LLh IJX!N .. MATERIAL LIST Item Description A 3 -1/16' 10M Remote Operated Hydraulic Choke B 3 -1/8' 6M Ad)uatable Choke 1 2-1/16' 5M Manual Gate Valve O n 2-14 3 -1/8' 6M Manual Gate Valve � • A O Me. 4111 1 0 0 •• 0 ,► 4 40V VW 11r 0 All From 0 RIG- 14 sop's '\ ---'- d �, 40 — ii W To Mud /Gas ,► Separator -111r- x i t A it) M • 'ii wr LEDGEND White Handle Valves Divert Normally Open Divert Line Red Handle Valves Line k,, Normally Closed l ' Date: 07 -08 -10 Rev. 2 / • • Ferguson, Victoria L (DOA) From: Johnson, David A (Swift) [David.A.Johnson @bp.com] Sent: Thursday, March 14, 2013 3 :25 PM To: Ferguson, Victoria L (DOA) Subject: RE: PBU X- 02(PTD 179 -069, Sundry 313 -103) Attachments: X -02 Exisiting Equipment.pdf; X -02 Replacement Equipment.pdf Victoria, The MASP is 2370 psi based on a BHP of 3250 psi at 8800' and a full column of gas (0.1 psi /ft). The wellbore schematics are attached. Dave From: Ferguson, Victoria L (DOA) f mailto :victoria.ferguson@)alaska.govl Sent: Thursday, March 14, 2013 9:27 AM To: Johnson, David A (Swift) Subject: PBU X- 02(PTD 179 -069, Sundry 313 -103) Dave, Please provide the following: 1. Schematic of original wellhead and modified wellhead. 2. MASP Thanx in advance, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave, Ste 100 Anchorage, AK 99501 Work: (907)793 -1247 victoria.ferquson(,alaska.gov 1 ECEIVED STATE OF ALASKA • AKA OIL AND GAS CONSERVATION COMAON JAN 1$ 2013 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1. Operations Abandon LJ Repair Well U Plug Perforations U Perforate LJ Other U Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended Well] 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development in Exploratory ❑ - 179 -069 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20397 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: , ADL0028313 PBU X -02 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 10460 feet Plugs measured 9555 feet true vertical 9441.57 feet Junk measured See Attachment feet Effective Depth measured 9555 feet Packer measured See Attachment feet true vertical 8604.65 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 82 20" x 30" 28 - 110 28 - 110 0 0 Surface 2662 13 -3/8" 72# L -80 27 - 2689 27 - 2688.85 4930 2670 1 Intermediate None None None None None None Production 9488 9 -5/8" 47# L -80 26 - 9514 26 - 8567.31 6870 4760 Liner 1443 7" 29# L -80 9009 - 10452 8106.85 - 9433.99 8160 7020 I Perforation depth Measured depth See Attachment feet rR True Vertical depth See Attachment feet SCANNED MAR 0 6 2013 Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 398 7597 6330 0 289 Subsequent to operation: 0 0 0 0 0 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 - Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil „ 0 Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerha s • b..com Printed Name Nita Summerhays Title Petrotechnical Data Technician i Signatur_ AIVA ,-,. �►_ Phone 564 -4035 Date 1/17/2013 RBDMS J AN 0 1,E V L- F 2/127/3 Form 10 -404 Revised 10/2012 (/ Submit Original Only • • Daily Report of Well Operations ADL0028313 ACTIVITYDATE I SUMMARY ® w . o. cope: DWI og, an..ac , emen ap Travel from B -20. Begin RU. Perform chain inspection and change packoff. 12/8/2012 « <Job Incomplete »> CTU #3 w/ 1.75 ". Job Scope: Drift/Log, Sandback, Cement Cap. Continued from WSR 12/08/12 MU BKR MHA and standby for scaffold to be built. Once scaffold was on the well, MU PDS GR /CCL logging tools w/ 3" DJN. PT PCE and kill well w/ 350bbls of 1% KCI while RIH. Completed logrun, +4' . RIH for sand back and cement Cap. Greased master valve RIH with Pig nozzel. Tag cement cap at 9693'. PUH 10' and pump 7bbls of 8ppa HEC slurry, -V21001bs of river sand. PUH to 8500' and wait 1 hr for sand to settle. Tagged down at 9642'. PUH and wait 30 min. 12/9/2012 ***Job continued on 12/10/12 WSR * ** CTU #3 w/ 1.75". Job Scope: Drift/Log, Sandback, Cement Cap. «< Continued from WSR 12/09/12 »> RIH and tagged down a 2nd time at 9642'. Batch up and pump 1000lbs (- 1.5bbls) of sacked river sand. Identified leak on MV stem. PUH and wait 1 hr for sand to settle. RIH and tag down at 9595'. PUH, wait 30min and re -tag. Tagged down again at 9595'. POOH to service MV. RIH and pump 1bbl cement pill w/ pig shear nozzle. Pump 1 bbl cement cap 9585 PUH laying in cement 1:1, pull to safety shear pig nozel POOH freeze protect well. Master valve leaking through stem packing. The valve was serviced, but needs to be replaced, notified Valve Shop Coord. 12/10/2012 « <Job Completed »> 1 Perforation Attachment ! ADL0028313 ame eration_Date P Aeration Code Meas Depth Top Meas I - • h Ba - II I - I g • • I D D- • 1 B. - - X- 02 1— 12/10/201 SPS 96 • 0 Y 9678 8690.55 8715.77 2 B - - • : -8796796' :8 1 X -02 7/21/1999 BPS 9825 9833 8848.83 8856.13 X -02 7/21/1999 BPS 9833 9840 8856.13 8862.53 X -02 7/21/1999 BPS 9841 9853 8863.44 8874.41 X -02 7/21/1999 BPS 9854 9860 8875.33 8880.82 X -02 7/21/1999 BPS 9860 9875 8880.82 8894.56 • X -02 7/21/1999 BPS 9875 9880 8894.56 8899.14 X -02 7/21/1999 BPS 9880 9891 8899.14 8909.23 X -02 7/21/1999 BPS 9891 9901 8909.23 8918.41 X -02 7/21/1999 BPS 9901 9905 8918.41 8922.09 X -02 7/21/1999 BPS 9911 9915 8927.6 8931.28 X -02 7/21/1999 BPS 9915 9925 8931.28 8940.48 X -02 7/21/1999 BPS 9925 9926 8940.48 8941.4 X -02 7/21/1999 BPS 9944 9965 8957.98 8977.36 FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF • Casing / Tubing Attachment ADL0028313 Casing Length Size MD TVD Burst Collapse CONDUCTOR 82 20" x 30" 28 - 110 28 - 110 LINER 1443 7" 29# L -80 9009 - 10452 8106.85 - 9433.99 8160 7020 PRODUCTION 9488 9 -5/8" 47# L -80 26 - 9514 26 - 8567.31 6870 4760 SURFACE 2662 13 -3/8" 72# L -80 27 - 2689 27 - 2688.85 4930 2670 TUBING 8854 5 -1/2" 15.5# L -80 25 - 8879 25 - 7989.96 7000 4990 TUBING 95 4 -1/2" 12.6# L -80 8879 - 8974 7989.96 - 8075.29 8430 7500 TUBING 13 7" Otis WD Packer 9930 - 9943 8945.08 - 8957.06 • TUBING 13 4 -1/2" 12.6# L -80 9930 - 9943 8945.08 - 8957.06 8430 7500 I I I I • • i Packers and SSV's Attachment ADL0028313 SW Name Type MD TVD Depscription X -02 PACKER 8868 7906.01 5 -1/2" BOT 3 -H Packer X -02 PACKER 9930 8870.98 7" Otis WD Packer `h TREE= 6" CAN r • V4aL} -EAD = MCEVOY SA. NOTES: ACTUATOR= OTiS X -0 2 ' KB. ELEV = 67.91' BF. aEV = 39.51' ' KOP= 3200 Max Angle = 38° 6400' I 2096' H5-1/2" OTIS SSSV LAND MP D = 4.562" I Datum MD = 9853' CAS LIFT MANDRELS Datum ND ° 8800'SS ST MD ND DEV TYPE VLV LATCH PORT DATE I 9 3227 3200 10 OTIS DMY RA 0 08/03/05 8 4984 4803 35 OTIS DAY RA 0 08/03/05 13 -3t8" CSG, 72 #, L -80, D = 12.347" H 2689' 7 6311 5862 38 OTIS DMY RA 0 11/11/84 6 7188 6567 37 OTIS DMY RA 0 11/11/84 5 7764 7031 34 OTIS DMY RA 0 11/11/84 L 4 8284 7465 31 OTIS MAY RA 0 11/11/84 Minimum ID = 3.813" @ 8942' 3 8435 7598 29 0115 DMY RA 0 11/11/84 4 -112" OTIS X NIPPLE 2 8577 7722 29 OTIS DMY RA 0 11/11/84 1 8718 7846 27 011S DMY RA 0 11/11/84 I 8782' H 5 -1/2' OTIS SLIDING SLEEVE, D = 4.562" II I 8844' _15-1/2' BOT PBR w /X PROFILER D = 3.813" I 5-1/2' 1PC TBG, 17 #, 1-80, 0.0232 bpf, — 8879' D = 4.892' l�� I 8868' H9-5/8" X 5 -1/2" BOT 3H A(R, ID = 3.813" I 'TOP OF 4-1/2' TBG Hl_ 8879' ] 8879' H 5-1/2" X 4 -1/2" XO I I I 8942' _I4 -1/2" OTIS X MP D = 3.813" 4-1/2' TBG, 12.6#, 1-80 BUTT, .0152 bpf, 8974' D = 3.958' N I 8974' I-- 14-1/2" TBG TAL, D = 3.820" TOP OF 7" L•R H 9009' I li I 8986' H amp TT LOGGED 12/02/89 I 9-5/8" CSG, 47 #, L -80, D = 8.681" 9514' • _�--- r Y 4 - 9565 TOP OF C NENT CAP SET 12/10/12 I WAVAN 9595' TOP OF SAND SET 12/10/1 �FORATION SUMMARY ♦ • 9690 TOP OF CEV'IT CAP SET 07/25/99 REF LOG: SOS BHCS ON 11/21/79 1.1.4. .�: ANGLEAT TOP PERE: 26° @ 9650' 8713° H BAKER BP SET 07/21/99 I Note: Refer to Roduction DB for historical pert data 9816' H I SIZE SPF M'IIB /AL Opn /Sqz SHOT SQZ —I BKR 3318" BP I 3-3/8" 6 9650 -9678 C 01/18/92 2 -7/8" 4 9768 -9833 S 10/19/85 06/08/99 9930' —j SEE TELEX DATA 03/01/92 - 03/02/92 I 3-3/8" 4 9825 -9853 S 08/17/92 06/08/99 3-3/8" 4 9854 -9860 S 01/10/92 06/08/99 ® X I 9930' H7" OTIS WD PKR I 2 -7/8" 4 9861 -9877 S 01/10/92 06/08/99 3-3/8" 4 9875 -9905 S 01/10/92 06/08/99 2 -7/8" 4 9877 -9880 S 01/10/92 06/08/99 I I I 9938' H4 - 1/2" OTIS X M, D= 3.813" I 2 -7/8" 4 9911 -9914 S 03/18/90 06/08/99 1 9941' H4 -1/2" OTIS XN NP, D= 3.725' I 3-3/8" 6 9915 -9925 S 09/15/93 06/08/99 2 -7/8" 4 9944 -9965 S 03/18/90 06/08/99 I 9941' I--14 -1/2" XXN PLUG I / ■ I 9943' H4-1/2" XNL.EG, D = 3.958" I I PBTD I--I 10397' 111 17' LW, 29#, L - 80, 0.0371 bpf, 10=6.1134" —I 10452' 11 *...1.141 DATE REV BY COMMH ITS DATE REV BY OOM 13 TS PRUDHOE BAY UNIT 11/?/79 ORIGINAL COMPLETION 08/05/11 GJB/ RN SET PX RUG (7/9/11) WELL X -02 11/11/84 RWO 10/22/12 CDJ/JMD CORRECTIONS & PULL PX FtUG (09/29 /12) PfffMT No: 1790690 07/21 -25/99 JDNV/TLP SET BRCMf CARADD 12/03 12/14/12 JGUJMD SET SAM YCMf CAP (12/10/12) AR No: 50- 029 - 20397 -00 01/02/02 RNITP CORRECTIONS SEC 8, T10N, R14E, 296' FM_ & 383' RM.. 07/13/02 JC/KAK PERE CORRECTIONS 08/03/05 DAV /PJC GLV C/O BP Exploration (Alaska) X-02 (PTD #1790690) Classified as Problem Well ) ) Subject: X-02 (PTD #1790690) Classified as Problem Well From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com> Date: Mon, 01 Aug 2005 18:48:01 -0800 To: "Carlson, Brian H" <Brian.Carlson@BP.com>, "Rossberg, R Steven" <RossbeRS@BP.com>, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com>, "GPB, GC3Wellpad Lead" <GPBGC3WellpadLead@BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWellOperationsSupervisor@BP.com>, "AOGCC - Jim Regg (E-mail)" <jim_regg@admin.state.ak.us>, "AOGCC.~· Winton Aubert (E-mail)" <Winton_aubert@admin.state.ak.us>, '~NSU, ADW WL & Completion Supervisor" <~1SUAJ)WWL&CompletionSupervisor@BP .com>,· "GPB, Wells Opt Eng" <GPBWellsOptEng@BP.com> " . CC:. "NSU, ADWW ell· Integrity Engineer':' <NSUADWWellIntegrityEngineer@BP.com>, . "Hughes,. Andrea (VECO)" <hugha4@BP.com> . . I ' ., TX J:4- All, Well X-02 (PTO #1790690) has been found to have sustained casing pressure on the IA. The TIO's on 08/01/05 were 2220/2290/0+ psi. The well failed a TIFL on 7/31/05 on overnight build up rate. The plan forward for this well is as follows: 1. DSM: Blind AL supply - DONE 2. DHD: TIFL - FAILED a// 3. SL: Caliper Tbg, run OGL Vs 4. OHD: Re-TIFL The wellbore schematic as been attached for reference. Please call if you have any questions. «X-02.pdf» Thanks, Donald Reeves - Filling in for Joe Anders Well Integrity Engineer 907-659-5102 907-659-5100 #1923 pgr SC.ANNED I~UG 0 9 20D5 Content-Description: X-02.pdf X-02.pdf Content-Type: application/octet-stream Content-Encoding: base64 Pre S SlI\ìe .tvUi{ P % }vlT-<--( P o~ b (.iÚ 10~~ 53tkfs'~ 33.3'20 O~ ff'fXt¡r-5 p\c('l"'~.J· pt'e-sst/v'es ~ 1\ Ql~l.IJtlY\.ces t.¡.:t CD 4q-¿ ï(,tbt'1 ~ L z zops~ '2 -¿C¡Of " SR<?11 ~'lloç 1 of 1 8/2/2005 3 :08 PM ) TREE = 6" OW WB..LHEAO= MCEVOY A Cl1JA TOR = OTIS 'kEf ËCË\I;· 67.91' éï=·....i=L E\i .;.... . .... . .... "à9~'5'fi KÓÞ = ·····..3"20Öï 'Max Angle = 38 @ 6400' 'b'~ttÙm"M'b";' ··........·..·...··..···...···..9"85·3·; OatumTVO= 8800'SS 13-3/8"CSG, 72#, L-80, 10= 12.347" 1-1 2689' .4 Minimum ID = 3.813" @ 8942' 4-1/2" OTIS X NIPPLE 5-1/2"TBG, 17#, L-80, 0.0232 bpf, 10 =4.892" 1-1 8879' TOP OF 4-1/2" TBG TA IL PIÆ 10 = __? H 8879' ) X-02 SAFETY NOTES: I I 2096' H5-112" OTIS SSSV LAND NIP, 10= 4.562" GAS LIFT MANDRELS ST MO lVO OEV TYPE VLV LA lCH PORT DIHE 9 3227 3200 10 011S DOME RA 1/4 01/09/92 ~ 8 4984 4803 35 011S SIO RA 1/4 01/09/92 7 6311 5862 38 011S OV RA 11/11/84 6 7188 6567 37 011S OV RA 11/11/84 5 7764 7031 34 011S OV RA 11/11/84 L 4 8284 7465 31 011S OV RA 11/11/84 3 8435 7598 29 011S OV RA 11/11/84 2 8577 7722 29 011S OV RA 11/11/84 1 8718 7846 27 011S OV RA 11/11/84 8782' 1-15-1/2" OTIS SLDING SLEEVE, 10= 4.562" 8844' U5-1/2" BOTPBRw/X FROFILffi 10=3.813" 8868' H 9-5/8" X 5-1/2" BOT 3H PKR, 10 = 3.813" 8879' H 5-1/2" X 4-112" XO 8942' U4-1/2" OTIS X NIP, 10 = 3.813" e 14-1/2" TAIL PIÆ, D =___7 H 8974' \ 8974' H4-1/2" TBG TAL, 10 = 3.820" 1 TOP OF 7" L NR l-i 9009' I I 8986' H B..MO IT LOGGED 12/02/89 1 9-5/8" CSG, 47#, L-80, 10 = 8.681" 1-1 9514' .. ... PffiFORA TION SUtvrJlARY 9690' HTOPOF CEMENT CAPSET07/25/99 REF LOG: SOS BHCS ON 11/21/79 9713' H BAKER IBPSET07/21/99 1 ANGLE AT TOP PERF: 26 @ 9650' 9816' HMA.RKERJOINT 1 f\bte: Refer to Production DB for historical perf data SIZE SPF IN1ERV A L Opn/Sqz ()A.1E 9924' H BKR 3-3/8"IBP 3-3/8" 6 9650-9678 0 01/18/92 2-7/8" 4 9768-9833 S 06/08/99 9930' H SEE TELEX OA TA 03/01/92 - 03/02/92 3-3/8" 4 9825-9853 S 06/08/99 3-3/8" 4 9854-9860 S 06/08/99 Z Z 9930' H 7" OTIS WO PKR 1 2-7/8" 4 9861-9877 S 06/08/99 3-3/8" 4 9875-9905 S 06/08/99 2-7/8" 4 9877 -9880 S 06/08/99 M 9938' H4-1/2" OTIS X NIP, 10 =3.813" 2-7/8" 4 9911-9914 S 06/08/99 9941' H4-1/2" OTISXNNIp, 10= 3.725" 3-318" 6 9915-9925 S 06/08/99 2-7/8" 4 9944-9965 S 06/08/99 9941' H4-1/2" XXN PLUG I 9943' H4-1/2" VVLEG, 10=3.958" 1 1 AnD H 10397' 17" LNR, 29#, L-80, 0.0371 bpf, 10 =6.184" H 10452' OA TE REV BY CO MVI ENTS 11nJ79 ORIGINAL COMPLEfION 11/11/84 RWO 07/21-25/9£ JONffiP SET lBP/CMf CA P-A 00 12/03 01/02/02 RNITP CORREe110NS 07/13/02 JOKAK PERF CORRECTIONS ~ DATE REV BY COM~NTS PRUDHOE BAY UNIT WELL: X-02 PffiMIT fib: 179-0690 A A No: 50-029-20397-00 SEe 8, T10N, R14E BP Exploration (Alas ka) MEMORANDUM State of AlaSka Alaska Oil and Gas Conservation Commission TO: Julie Heusser, ~' DATE: Commissioner December 9, 2000 THRU: Tom Maunder, P. I. Supervisor FROM: Jeff JOnes, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Field BPX / X-Pad Saturday, December 9, 2000: I traveled to BPX's X Pad in the Prudhoe Bay Field to witness Safety Valve System tests. Merv Liddelow, BPX representative in charge of the testing, performed the tests in a safe and proficient manner. Of the 26 wells tested, 3 failures were. witnessed. Well X'14A's SSV failed to close and well X,19B's pilot was frozen and the SSV failed to close. Mr. Liddelow indicated to me on 1.2/10/00. that theSe ~items have been corrected and successfully re-tested. The AOGCC test reports are attaChed for reference, I conducted 26 well house inspections concurrent with the SVS tests. A slight crude oil leak was noted on a wellhead flange of well X-19B. Mr. Liddelow indicated he would have this item addressed. No other exceptions were noted. SUMMARY: I witnessed SVS tests and conducted well' house inspections on · BPX's X Pad. 26 wells, 53 components tested, 3 failures. 26 well houses inspected. Attachments: SVS PBU X Pad 12-9-00 JJ NON-CONFIDENTIAL SVS PBU X Pad 12-9-00 JJ.dOc Alaska Oil and Gas Conservation Commission Safety Valve System Test Report operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/X Pad Separator psi: LPS 174 Dr .re: 12/9/00 HPS 723 Well Permit Separ Set L/P Test Test Test ·Date Oil, WAG, GINJ, Number. Number PSI PSI Trip Code Code Code ,Passed GAS or CYCLE X-01 1790540 174 125 125 P P . OIL X-02 .1790690 174 125 125 P P OIL X-03A 1980860, 723 550 400 P P ' OI~ 3~-04. 1790890 174 i25 125 P P ' ' OIL X-05. 1791040 174 125 115 P P OIL X-06 1800090 ' " X-07 1800130' 174 125' 110 .'P P OIL J~'08 ' 1800360 '.174 ' 125! 115' ~P P OIL · X-09 1800280 . ~ . X, 10 . 1800430' . 174 ' 125' 120 'P ' P ' OIL X-11A' . 1990780. 2000 '1950 'P P P. . WAG X-12 1800440 174" .125 '110 ' P P '. ' OIL : X-13A i9'30650 174 125 100' P' P ~. OIL X-14A 192i~430 174 125~ · 120 ':'P' ' 5 ' OIL 3~-15. ,.1800740 174 '~ '125 125 P P . '. OIL X-16' 1811720 174 '125 .125 P P. OIL X-17' 1811690 '723 ' 55.0 520 P P OIL X-18 I 1811620 .174 '1'25' 1.20 P'. P OIL X-19B 1961'300. i74 125 0 2 5 ' · OIL X,20 1940670 X-21A 1991080 "174 125: 110 P P' OIL X.22 1931300 174 125 110. P P OIL , ,, X-23 .'1840610 · · , X-24A 1991250 ~X-2~ 1840340. 174 · 125 120. P' 'P · · OIL 3(-26 1840300 ~ ' ' ' . ' . ~-27 1840690 174 125 120 P P ' 0IL X-28 1'931140 X-29 1931390 · ' ~X-30' ~ 1950410 ' 174 12~"' 115' P P OIL ,, X-31 .1931980 174 125! 120 'P " P OIL X-32 · 1931620 174 125 125 P P OIL: X-34 1931720 174 '125 115 P. P '~ OIL1 X,35' 1931990 174 1251 90. P P . OIL , , 12/13/00 Page 1 of 2 SVS PBU X Pad 12-9-00 JJ.xl's Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE II I X-36 1961670 Wells: 26 Components: 53 Failures: 3 Failure Rate: 5.6% [21o0 Remarks: 12/13/00 page 2 of 2 SVS PBU X Pad 12-9-00 JJ.xls 31 Al I:: UP ALA:SKA ALA~,KA OIL AND GAS CONSERVATION COMMIS~N REPORT ("F SUNDRY WELL OPE,iATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Plugging Pull tubing__ Alter casing __ Repair well__ Perforate.__ Other X 2. Name of Operator BP Ex/~loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_cle, Alaska 99519-6612 4. Location of well at surface 296' SNL, 383' EWL, SEC. 08, TION, R14E, UPM At top of productive interval 2441' NSL, 2250' EWL, SEC. 05, TION, R14E, UPM At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659' NSL, 2458' EWL, SEC. 05, TION, R14E, UPM (Sa.o R) 5. Type of Well: DevelopmenX Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 74.10 AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23-05-10-14) PBU 9. Permit number/approval number 79-69 / 10. APl number 50.029-20397 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10460. feet Plugs (measured) BKB 9441 feet 10397 feet Junk (measured) BKB 9382 feet Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 10.6 c.v. 144 Surface 2655 13 3/8 4641 c.f. 2689 Intermediate 9480 9 5/8 1463 c.f. 9514 Production -- Liner 1443 7 314 c.f. 9009-10452 Perforation depth: measured 9650'-9678' (Sag R) 97f~R'-.qR.'~R'_ .qR.54'-.qRRi3'. .qR91 '-.q.q01 '..q.ql 1 '-.q.qPR'. .q.q44'-.q.qRR' /'lvi.~h~k) true vertica§ubsea 8616'-8642' (Sag R) 8723' - 8903' (five Ivishak intervals) Tubing (size, grade, and measured depths 1/2" L-80 to 8868' with 4 1/2" tailpipe to 8974' True vertical depth BKB 144 2689 8567 8107-9434 ORIGINAL Packers and SSSV (type and measured deptl~5 5/8"1/2,, SssvBOT 3HatPacker2096, at 8868'; 7" Otis WD packer 13. Stimulation or cement squeeze summaw See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure ~S~:'~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 980 8452 7149 0 1040 9631 7544 0 Tubing Pressure 283 301 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run__ .Daily Report of Well Op/~ltions , OR Gas Suspended 17. I her.~ C,~Ttify that th~r,egoing is,,l'C)~/~j~nd correct to the best of my knowledge. Sig w Title Technical Assistant IV Form 10-40,~R~ 0~'/~/88 Service Date/~.//~ SUBMIT IN DUPLICATE ,~. X-02 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/08/99 IA Cement Plug was performed using the following fluids: SUMMARY MIRU Dowell CTU #2. RIH and dry tag PBTD at 9712 ctmd. PU to 9600' and circulate kill well. Mix and pump 1 bbl latex cement with foam plugs ahead and behind. Spot cement at 9704'. PU shear disk in nozzle. POH keeping wellbore full. RDMO. Will keep well SI for one day prior to POP. Fluids Pumped BBLS. Description 320 Freshwater w/2% Kcl & Friction reducer 106 Seawater 1 Cement 38 Meoh. 465 Total Pumped NRWO OPERATIONS 07/25/99 IA Cement Plug was performed using the following fluids: RECEIVED SUMMARY [~iOV 0 5 1999 Alaffa 0il & Gas Cons. C0mmission MIRU DS CTU #2. Pick up pigshear nozzle. SIWHP=2400 psi. Blee~ slowly to LDF. RIH to 9200' while circulating to equalize coil and backside. Dry tag PBTD at 9709' (corrected to ELMD - top of IBP + 5' of sluggits). Spot a 3A bbl cement plug on top of sluggits at 9709'. Top of cement @ 9690'. POH. Freeze protect tubing with 50 bbls MEOH, Left well shut in. RD DS CTU #2. Fluids Pumped BBLS. Description 50 MeOH 496 2% KCL Water .75 Latex Cement 546.75 Total Pumped STATE OF ALASKA ALA~ 2IL AND GAS CONSERVATION COMMISSI(~''~ REPORT bP SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown .... Stimulate Plugging Perforate Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. Alter casing 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. LOCation of well at surface 296' SNL, 383' EWL, SEC. 08, TION, R14E, UPM At top of productive interval 2441' NSL, 2250' EWL, SEC. 05, TION, R14E, UPM At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659'NSL, 2458'EWL, SEC. 05, TION, R14E, UPM Repair well 5. Type of Well: Development Exploratory Strat~raphic Service RECEIVED (Sag R) jUN 2 8 1994 A~ska LJil & Gas Cons. C0mmissi( Anchorage Other 6. Datum elevation (DF or KB) KBE = 74.10 AMS.L feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23-05-10-14) PBU 9. Permit number/approval number 79-69 / 10. APl number 50- 029-20397 nl 1. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10460 feet BKB 9441 feet 10397 feet BKB 9382 feet Plugs (measured) Junk (measured) Casing Length Structural -- Conductor 110 Surface 2655 Intermediate 9480 Production -- Liner 1443 Perforation depth: measured Size Cemented Measured depth 144 2689 9514 20 x 30 10.6 c.y. 13 3/8 4641 c.f. 9 5/8 1463 c.f. 7 314 c.f. 9009-10452 9650'-9678' (Sag R) 9768'-9833', 9854'-9880, 9891'-9901', 9911'-9926', 9944'-9965' (Ivishak) True vertical depth BKB 144 2689 8567 810 7- 9434 true vertical subsea 8616'-8642' (Sag R) 8723' - 8903' (five Ivishak intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8868' with 4 1/2" tailpipe to 8974' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze sUmmary See Attachment 14. 9 5/8" BOT3Hpacker at 8868'; 7" Otis WD packer at 9930'; 5 1/2" SSSV at 2096' Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended '"17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~~~,(,;, ~,,z-) .~ r~,~ .Title SeniorTechnicalAssistantl Form 10-404'Rev 06-/15/88 ' 7~ Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 980 8452 7149 0 1040 9631 7544 0 Service Tubing Pressure 283 301 Date ~// SUBMIT IN DUPLICATE 09/15/93 fjh 6/25/94 WELL X-02(23-05-10-14) REPERF The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9915' - 9925' MD RECEIVED JUN 2 8 1994 At~ska Oil & Gas Cons. Commissior' Anchorage ALA , OIL AND ~^S CONSERVATION COMMISSI ,, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 296' SNL, 383' EWL, SEC. 08, TION, R14E, UPM At top of productive interval 2441' NSL, 2250' EWL, SEC. 05, TION, R14E, UPM (Sag At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659' NSL, 2458' EWL, SEC. 05, TION, R14E, UPM 6. Datum elevation (DF or KB) KBE = 74.10 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23-05-10-14) PBU 9. Permit number/approval number 79-69 / 10. APl number 50- 029-20397 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 10460 feet Plugs (measured) truevertical BKB 9441 feet Effective depth: measured 10397 feet Junk (measured) true vertical BKB 9382 feet Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20x30 10.6 c.y. 144 144 Surface 2655 13 3/8 4641 c.f. 2689 2689 Intermediate 9480 9 5/8 1463 c.f. 9514 8567 Production -- Liner 1443 7 314 c. f. 9009-10452 8107-9434 Perforation depth: measured 9650'-9678' (Sag R) 9768'-9833', 9854'-9880', 9891'-9901', 9911'-9926', 9944'-9965' (Ivishak) true vertical subsea 8616'-8642' (Sag R) 8723' - 8903' (five Ivishak intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8868' with 4 1/2" tailpipe to 8974' Packers and SSSV (type and measured depth) 9 5/8" BOT 3H packer at 8868'; 7" Otis WD packer at 9930'; 5 1/2" SSSV at 2096' D E r' c i i 13. Stimulation or cement squeeze summary See Attachment I\ L k., L I V 14. Intervals treated (measured) O'CT - 7 199, Treatment description including volumes used and final pressure Alaska 0il & Gas Cons. C0111lll A.nr, hor~_nR Reoresentative Daily Average Production or In!ection Date, OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 240 3141 3222 0 252 1210 ~ 9523 6801 0 277 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended . .. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed~' ~r)~,~ ~'?_ "~ ~~ Tit.lo SeniorTechnicalAssistantl Form 10-40-~'~ R-ev-06/15788 / Service SUBMIT IN DUf:'LrCATE 8/17192 5/21/92 1118/92 01/18/92 1110/92 fjh 7/01/93 WELL X-02(23-05-10-14) Addperf/REPERF/NRWO The following interval were added perforation using 3 3/8" guns, 4 SPF, random orientation and 60°120° phasing. 9841' - 9853' MD The following interval were reperforated using 3 3/8" guns, 4 SPF, 30° orientation and 60° phasing. 9825' - 9840' MD The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9658' - 9678' MD 9650' - 9658' MD A NRWO was performed using the following fluids: 256 BBLS SW TO LOAD WELL 5 BBLS EW 10 BBLS CEMENT 22 BBLS EW(SPACER) 1 0 BBLS PW 15 BBLS DUO-POLYMER (CONTAMINANT) 6 BBLS PW (DISPLACEMENT) 1 29 BBLS PW (LIVE REVERSE OUT) 59 BBLS PW (JET PASS) 50 BBLS RECOVERED (GLG DISPLACEMENT) 36 BBLS MEOH (FREEZE PROTECTION CT) WELL CLEANED OUT TO 9588' 2 BBLS LOAD FLUID BEHIND PIPE (CUMULATIVE APPROXIMATE TOTAL LOAD FLUID BEHIND PIPE IS 2 BBLS) +/- 8 BBLS CEMENT RECOVERED (DOES NOT INCLUDE CEMENT NOT PUMPED) CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING .2% CFR-3, 01 65% HR-12,. 1 65% GAL/SK HALAD-344L sqz#1 The following interval were reperforated using 3 3/8" guns, 4 SPF, 30° orientation and 60°/120° phasing. 9854' - 9860' MD 9875' - 9905' MD Atasga Oil & Gas ConS. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 09/22/93 T# 85045 BPX/PBU~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. BRIDGE PLUG 09/15/93 a-24 ~'70 CNA; ~cG%' 09/18/93 A-40 9%-~ PRODUCTION LOGw 09/17/93 C-03~~ PRODUCTION LOG ~ 09/15/93 D-09~-~5 ~PE~)~&/~ 09/16/93 D-27 ~-~ ~PE~) ~~ 09/16/93 G--07~¥~ PRODUCTION LOG~ 09/14/93 P-02 9~8~ ~E~) ~~ 09/13/93 P-2~_ . _ SBL~G~~ 09/16/93 P 23 ~%%% [OERF)~ - 3~ ~ ~ ~CC~ 09/16/93 P-23/ ~k/CCL {~% 09/16/93 R-01~9 ~E~) ~G~a 09/18/93 S-05 ~-~7 CCL (~ ~c~) 09/17/93 U-11~ ~ SBL~G~{~h 09/13/93 U-11B J~-~~ [~ 09/13/93 U-11BI (PE~) ~g~G~ 09/14/93 X-02 ~-~ [PE~)~/~U 09/15/93 X-27 ~ CNL/~{cC~ 09/18/93 Information Control Well Records 9250.00- 9700.00 ATLAS 5 " 10600.00-11052.00 ATLAS 5 " 9800.00-10196.00 ATLAS 5 " 9800.00-10188.00 ATLAS 5 " 10230.00-10494.00 ATLAS 5 " 9100.00- 9634.00 ATLAS 5 " 11000.00-11356.00 ATLAS 5 " 12480.00-12736.00 ATLAS 5 " 11488.00-12175.00 ATLAS 5 " 11833.00-12100.00 ATLAS 5 " 11488.00-12175.00 ATLAS 5 " 8740.00- 9130.00 ATLAS 5 " 9340.00- 9552.00 ATLAS 5 " 10100.00-11013.00 ATLAS 5 " 10100.00-11013.00 ATLAS 5 " 10200.00-10850.00 ATLAS 5 " 9630.00- 9914.00 ATLAS 5 " 11150.00-11719.00 ATLAS 5 " A~ska Oil & Gas Cons. C°mmis, ion An~orago BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU ~. OGS DATE: 04/21/93 T# 84491 Enclosed is your copy of the materials listed' below. If you have any questions, please contact BP Well Records at (907) 564-4004. ,A-04~,o~ PFC 04/07/93 #1 ~A-23 ~,~O PDK-100 04/06/93 #1 A-24~' PFC 04/04/93 #1 ,,~ B-07 ,~ PFC 04/17/93 #1 B-15~'%~ PRODUCTION LOG 04/16/93 #1 B-34~'~'1 PFC 04/15/93 #1 A~10C-26 .\¢. PFC 04/11/93 #1 ' D-12~ ~ PFC 04/12/93 #1 ,~E-10 ~ PRODUCTION LOG 04/17/93 #1 E-11~ PRODUCTION LOG 04/14/93 #1 F-l~'%~, CCL/PERF 04/06/93 #1 }~H-17 PFC H_2~,~ 04/13/93 #1 PFC 04/06/93 #1 ,~J-15 ~% LEAK DET 04/15/93 #1 S-lg~''' PRODUCTION LOG 04/04/93 #1 ,\'~JJS-35~ PFC 04/08/93 #1 X-02 PRODUCTION LOG 04/16/93 #1 Y-i~~ PRODUCTION LOG 04/10/93 #1 Y-15u' PRODUCTION LOG 04/10/93 #1 10500.00-10893.00 ATLAS 5 " 11050.00-11495.00 ATLAS 5 " 10754.00-11037.00 ATLAS 5 " 11550.00-11800.00 ATLAS 5 " 9180.00- 9450.00 ATLAS 5 " 11600.00-11950.00 ATLAS 5 " 11371.00-1].795.00 ATLAS 5 " 8700.00- 9200.00 ATLAS 5 " 11450.00-11694.00 ATLAS 5 " 10350.00-10705.00 ATLAS 5 " 9985.00-10240.00 ATLAS 5 " 10280.00-10670.00 ATLAS 5 " 9604.00- 9920.00 ATLAS 5 " 11000.00-11500.00 ATLAS 5 " 3000.00-11610.00 ATLAS 5 " 9600.00- 9900.00 ATLAS 5 " 9500.00- 9920.00 ATLAS 5 " 9930.00-10320.00 ATLAS 5 " 2200.00-10280.00 ATLAS 5 " Infor~nation Contro~ Well Records ~ , ,<^ o,.^.o couu, 0 R I 6 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 296' SNL, 383' EWL, SEC. 08, TION, R14E, UPM At top of productive interval 2441' NSL, 2250' EWL, SEC. 05, TION, R14E, UPM (Sag R) At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659' NSL, 2458' EWL, SEC. 05, TION, R14E, UPM 12. PreSent well condition summary Total depth: measured true vertical Effective depth: measured true vertical 5. Type of Well: Development Exploratory Stratigraphic Service 10460feet Plugs (measured) BKB 9441feet 10397feet Junk (measured) BKB 9382feet 6. Datum elevation (DF or KB) KBE--.74.10 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23.05-10-14) PBU _ g. Permit number/approval number 79-69/ 10. APl number 50- 029-20397 11. Field/Pool Prudhoe Oil Pool Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth .. 110 20x30 10,6c.y. 144 2655 13 3/8 4641 c.f. 2689 9480 9 5/8 1463 c.f. 9514 .. measured 1443 7 314 c.f. 9009-10452 9650'-9678' (Sag R) 9768'-9833', 9854'-9880', 9891'-9901', 9911'-9926', 9944'.9965' (Ivishak) subs,e,a 861,6,'-8642' (Sag R) 8723 - 8903 (five Ivishak intervals) True vertical depth BKB 144 2689 8567 8107-9434 true vertical Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8868' with 4 1/2" tailpipe to 8974' 13. ~t:2k;~:i 2~ do ~;;io ~~ ;2111z ~~22~~Orl Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Reoreser~tative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2312 ..~,20315 8310 0 240"¢''''''~ 3141 3222 0 Tubing Pressure 371 252 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas ,,, Suspended Service 17, I hereby certify that the foregoi~ is true and correct to the best of my knowledge. Form 10-404 'Rev 06/15/88 / Date SUBMIT IN DU'PLId'ATE WELL X-02(23-05-10-14~ N0n-RigWorkOver 12/07/91 A NRWO was performed using the following fluids: 555 bbls PW to load well 5 bbls PW 33 bbls ACID 10 bbls PW 5 bbls EW(Preflush) 8 bbls Cement(8 w/foam=12 dwn hole) 12 bbls Cement(W/O Foam) 24 bbls EW(Spacer) 22 bbls Duo Polymer(Contaminant) 10 bbls PW(Displacement) 95 bbls PW(Jet Pass) 32 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 9945' 775 bbls load fluid behind pipe today 0 bbls Cement recovered ACID: 12%HCL/20%XYLENE, l%WS-36,.4%HAI- 85,.45%FERCHEK-A CEMENT FOAM:15.5 ppg class g cement containing,.15 LWL .13 GAL/SK HALAD-344 L CE~: 15.5 ppg class g cement containing, .20% CFR-3, .21% HR-12, .16 GAL/SK HALAD-344 L NOTE: SQZ#1 FAILED 12/08/9 1 A NRWO was performed using the following fluids: FLUIDS: 530 bbls PW to Load Well 5 bbls PW 20 bbls Cement W/Foam 40 bbls PW 24 bbls Cement 30 bbls EW(Spacer) 33 bbls Duo Polymer(Contaminant) 110 bbls PW(Jet Pass) Well Cleaned Out to 9932' 790 bbls load fluid behind pipe today 0 bbls Cement recovered CEMENT FOAM:15.5 ppg class g cement containing,.15 LWL .15 Gal/SK HALAD-344 L CEMENT: 15.5 ppg class g cement containing, .20% CFR-3, .21% HR-12, .16 GAL/SK HALAD-334L NOTE: SQZg2 FAILED RE .EIVED OCT 2 2 19g . Alasl~a.Oil & Gas Cons. eommissio /~nchorage PAGE 2 WELL X.02(23.05-10-14~ FLUIDS: 5 bbls PW 20 bbls Cement 40 bbls PW(Displacement) 32 bbls MEOH(Freeze Protection CT) 48 bbls MEOH(Freeze Protection Well) 0 bbls Cement Recovered CEMENT FOAM: 15.5 ppg class g cement containing, .15LWL .15 GAL/SK HALAD-344L NOTE: SQZ#3 FAILED 12/12/9 1 A NRWO was performed using the following fluids: 100 bbls PW to load well 105 bbls Diesel 50 bbls PW 10 bbls EW(Preflush) 46 bbls Cement(15 "G",ll THIXO,20 "G") 13 bbls EW(Spacer) 25 bbls Diesel 36 bbls MEOH(Freeze Protection CT) 350 bbls load fluid behind pipe 0 bbls Cement Recovered CEMENT: 15.5 ppg class g cement containing, .20% CFR-3, .17% HR-12, .15 GAL/SK HALAD-344L CEMENT THIXO:15.8 ppg class g cement containing, 10 PP SK Calsel, 5 PP SK Gilsenite, 8% Gel, .3% HR-7 NOTE: SQZg4 FAILED 12/14/9 1 A NRWO was performed using the following fluids: 184 bbls PW to Load Well and Jet Perfs 10 bbls EW(Preflush) 30 bbls Cement(10 neat, 10 W/Aggregate, 10 neat) 10 bbls EW(Spacer) 21 bbls PW 40 bbls DUO Polymer(Contaminant) 32 bbls PW(Displacement) 650 bbls PW(Reverse Out) 35 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 9898' 105 bbls Load fluid behind pipe(Cumulative Approximate Total load fluid behind pipe is 1096 bbls) 16 bbls Cement recovered(Does not include cement not pumped) CEMENT #1: 15.5 ppg class g cement containing, .20% CFR-3, .12% HR-12, .15 GAL/SK HALAD-344L NOTE: SQZ#5 FAILED PAGE 3 WELL X-02(23-05-10-14} 12/17/91 A NRWO was performed using the following fluids: 1150 bbls PW 55 bbls Biozan 33 bbls MEOH(Freeze Protection CT) NOTE: SQZ#6 FAH~ED 1 2/18/9 1 A NRWO was performed using the following fluids: 201 bbls PW 5 bbls EW(Preflush) 10 bbls Cement(44 CC Lead Slurry) 20 bbls Cement(60 CC Tail Slurry) 28 bbls EW(Spacer) 30 bbls Duo Polymer(Contaminant) 3 bbls PW(Displacement) 300 bbls PW(Reverse Out) 50 bbls PW(Jet Pass) 49 bbls PW(Final Reverse Out) 69 bbls Recovered(N2 Displacement) 33 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 9872' 25 bbls load fluid behind pipe today 17 bbls Cement Recovered LEAD CEMENT: 15.5 ppg class g cement containing, .2% CFR-3, .012% HR-12, .16 Gal/Sk Halad-344L TAIL CEMENT: 15.5 ppg class g cement containing, .2% CFR-3, .012% HR-12, .13 Gal/Sk Halad-344L NOTE: SQZ#7 FAILED 1 2/25/9 1 A NRWO was performed using the following fluids: 227 bbls PW to Load Well/Cool Perfs 10 bbls EW(Preflush) 18 bbls Cement 15 bbls EW(Spacer) 30 bbls PW 27 bbls Duo Polymer(Contaminant) 33 bbls PW(Displacement) 433 bbls PW(Reverse Out) 55 bbls PW(Jet Pass) 85 bbls Recovered(N2 Displacement) 35 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 9870' 50 bbls Load Fluid Behind Pipe 17 bbls Cement Recovered(Does Not include Cement Not pumped) CEMENT: 15.5 ppg class g cement containing, .2% CFR-3, .015% HR-12, .17 Gal/SK Halad-344 L NOTE: SQZ#8 FAILED 10/12/92 fjh BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 08/21/92 T# 83821 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. H_24~'3° P~RF 08/14/92 #1 9500.00- 9974.00 SCH 5 " R-08~/,/ STP FALLBACK REFRAC 08/01/92 #1 10600.00-11140.00 CAMCO 5 " R-31~~] CCL 08/16/92 #1 9700.00-10564.00 SCH 5 " x-02 ?f,~f, ~.R~' 08/17/92 #1 97O0.0O- 9903.00 SCH S " Information Control Well Records Adrian J. Martin crr..IV £ D AUG ~ 5 '199~ Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 /3 DATE: 05/27/92 T# 83529 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. >? cc,. D-18 ~/"/~ PFC ..- D-2'--'~ ~'~/ CCL/PERF ~ F-31~-/~ TDT-P BO~X / F-45 ~/-- ~ PROD-F ~ G-02 ~ TDT-P BO~X ~ 04/10/92 H-13 ~/'~f~PROD-F Z 05/10/9~ M-26A~--~ CNL ~ 05/20/92 M-31~Z-)~ CCL/ 05/22/92 -167 _.GAS LIFT SURVE~ 04/29/92 W-3~'/~ CCL/PERF, 05/14/92 x-02 Z-19 ~%3 PERF / D-08 ~ USI CEMENT D-08 ~/-/~USI CORROSION 5 " 04/29/92 #1 05/23/92 #1 05/25/92 #1 05/09/92 #1 05/05/92 #1 #1 #1 #1 #1 #1 #1 #1 05/21/92 #1 05/15/92 #2 11500.00-12372.00 CAMCO 5 " 10900.00-11150.00 ATLAS 5 " 10080.00-10369.00 ATLAS 5 " 8750.00- 9482.00 SCH 5 " 9000.00- 9330.00 CAMCO 5 " 9500.00-10231.00 SCH 5 " 9250.00- 9500.00 CAMCO 5 " 9100.00-11770.00 SCH 2/5" 8800.00- 9861.00 SCH 5 " 2100.00-11900.00 CAMCO 2/5" 365.00-10200.00 CAMCO 2/5" 11300.00-11820.00 ATLAS 5 " 9690.00- 9881.00 SCH 5 " 13450.00-14350.00 SCH 5 " 04/2~/92 #1 12100.00-12372.00 CAMCO 05/09/92 #1 100.00- 8900.00 SCH 05/09/92 #1 100.00- 8900.00 SCH Information Control Well Records Adrian J. Martin JUN 1 ] 1992 Alaska Oil & Gms Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 // DATE: 04/03/92 T% 83365 BP CASED HOLE FINALS Enclosed is your copy of the materials li'sted questions, please contact BP Well Records at R-15~-3/ GAS LIFT SURVEY H-16 ~/--F~- GAS LIFT. SURVEY Y'14 ~g- ~ GAS LIFT SURLY 03/06/92 91 03/06/92 91 12/18/91 91 03/07/92 91 03/07/92 #1 03/11/92 %1 03/06/92 91 03/12/92 #1 03/15/92 %1 03/14/92 %1 03/11/92 %1 TEST 03/04/92 below. If you have any (907) 564-4004. 12350.00-12650.00 CAMCO 5 " 9000.00- 9575.00 CAMCO 5 " 10000.00-10996.00 CAMCO 5 " 500.00- 1980.00 CAMCO 5 " 609.00- 9295.00 CAMCO 2/5" 2850.00- 8700.00 CAMCO 2/5" 9550.00- 9927.00 CAMCO 5 " 0.00-10300.00 CAMCO 2 " 0.00- 9600.00 CAMCO 2 " 9050.00- 9400.00 CAMCO 5 " 2850.00- 9900.00 CAMCO 2/5" #1 13600.00-13886.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED APR "l 5 1992 Naska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska)Inc. ;900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/09/92 T# 83308 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. '/X-03 ?~-~_~ CCL/PERF U-12 ~5--'F~. PROD-F U-07~--~° PROD-F x-02 G-32~~'/~ P~OD-F . . M-26 ~.--/ PROD-F C-07 ~d~ TE~ K-02A~~ GAS ENTRY SURVEY 5 " s- 4 2 " 02/29/92 #1 01/26/92 #1 01/25/92 #1 01/25/91 #1 02/05/92 #1 01/23/92 #1 01/21/92 #1 01/19/92 '#1 02/04/92 #1 01/26/92 #1 01/15/92 #1 11650.00-11870.00 ATLAS 5 " 10650.00-11090.00 CAMCO 5 " 9550.00- 9725.00 CAMCO 5 " 9550.00- 9800.00 CAMCO 5 '" 9000.~00- 9456.00 CAMCO 5 " 13000.00-14200.00 CAMCO 5 " 10950.00-11522.00 CAMCO 5 " 250.00- 3100.00 CAMCO 2 " 11550.00-11752.00 CAMCO 5 " 9650.00- 9655.00 CAMCO 5 " 11000.00-11547.00 CAMCO 01/21/92 #1 10750.00-11950.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED MAR 2 4 1992. Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/20/92 T# 83191 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 12/31/91 #1 01/02/92 #1 01/04/92 #1 01/01/92 #1 01/01/92 #1 01/07/92'$1 01/01/.92 $1 8970.00- 9500.00 CAMCO 5 " 9300.00- 9850.00 CAMCO 5 " 9410.00- 9914.00 CAMCO 5 " 11700.00-12600.00 CAMCO 2/5" 8450.00- 9850.00 CAMCO 5 " 10580.00'10835.00 CAMCO 5 " 10200.00-10520.00 CAMCO 5 " 12/31/91 $1 9700.00-10065.00 CAMCO Information Control Well Records Adrian J. Martin ' RECEIVED JAN 2 9 ]992' Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Ex01oration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/24/92 T# 83202 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. o8 PERF 01/15/92 #1 CCL/PERF 01/18/92 #1 CL 01/19/92 #1 information Control Well Records Adrian J. Martin 11650.00-11915.00 SCH 5 " 8900.00- 9750.00 ATLAS 5 " 8200.00- 9279.00 ATLAS 5 " BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/16/92 T# 83186 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. . ,COMP LET ION ~)~-2 3 ~ ~'~TcoMPLETTON Information Control Well Records Adrian J. Martin 01/10/92 #1 01/10/92 #1 01/10/92 #1 9750.00- 9897.00 SCH 5 " 10984.00-11330.00 SCH 5 " 9850.00-11358.00 SCH 5 " / RECEIVED JAN 2 2 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612" (907) 561-5111 To: Distribution Date: 12/08/89 Transmittal: 80672 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-16 LEAK DET. 12/03/89 91 9465-9970 SCH 5" A-16 NOISE 12/03/89 ~1 0-9700 SCH 5" F-05 PROD-F 12/01/89 ~1 11050-11370 SCH J-17 PERF 12/04/89 91 9600-10630 SC~ 5" J-21 TDT-P 12/03/89 ~i 9250-9572 $C~ N-20 CNL 12/04/89 91 9250-10137 SC~ 5" X-02 PROD/JEWLERY 12/02/89 ~1 8700-9928 SCH Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES /// - DEC 1989 Aiask~ Oil l Gas Cons. .C.0.mm ~chora. ge BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 21, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well X-2 (23-05-10-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our sub- sequent report of perforating the well. Yours very truly, Supervisor Waterflood & Miscible Flood BJP:JAM Enclosures (4) cc: L. Burke (MB12-1) Well RecOrds (LR2-1) w/10 Well File RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Stimulate Plugging Alter casing Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 296' SNL, 383' EWL, SEC. 08, TION, R14E, UPM At top of productive interval 2441'NSL, 2250'EWL, SEC. 05, TION, R14E, UPM (Sag R) At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659' NSL, 2458' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured 10460 feet true vertical BKB 9441 feet Perforate X Other. 6. Datum elevation (DF or KB) KBE= 74.10 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23-05-10-14) PBU 9. Permit number/approval number 79-69 / 9-070 10. APl number 50- 029-20397 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 10397feet true vertical BKB 9382feet Junk (measured) Casing Length Structural -- Conductor 110 Surface 2655 Intermediate 9480 Production -- Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Size Cemented Measured depth True vertical depth BKB 20 x 30 10.6 c.y. 144 144 13 3/8 4641 c.f. 2689 2689 9 5/8 1463 c.f. 9514' 8567 1443 7 314c. f. 9009-10452 9650'-9678' (Sag ,FI),, 9768'-9833', 9854-9880, 9891'-9901', 9911'-9926', 9944'-9965' (Ivishak) subsea 8616'-8642' (Sag R) 8723'. 8903' (five IviShak intervals) 5 1/2" L-80 to 8868' with 4 I/2" tailpipe to 8974' 8107-9434 Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 9 5/8" BOT 3H pa~r at 8868'; 7" Otis WD packer at 9930'; 5 1/2" SSSV at 2096 14. Intervals treated (measured) Treatment description including volumes used and final pressure :~asJ~..OjJ & gas Coil& Reoresentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mol Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 3392 13273 7552 0 342 Subsequent to operation 3610 13758 6492 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations _X Oil X Gas Suspended 17. I hereby certify that the foreg~ng..is true and correct to the best of my knowledge. Signed ,~--~,~.~fJ~ Title Form 10-404 Rev 06~15/88 / 0 450 Service Supervisor Waterflood/Miscible Flood Date SUBMIT IN DUPLIdAT~' WELL X.2 (23.0~.10.14~ pBU ADD'L. PERFORATION OPERATIONS The following Sag River interval was perforated February 24, 1989 using Schlumberger 3 3/8" carrier guns at 6 spf: 9650' - 9678' MD BKB (8616' - 8642' TVDss) (Ref. BHCS, 11/21/79) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations, then tested. jm 3/15/89 BP EXPLORATION HOUSTON ARCO CHEVRON E~XXON TEXA~,O TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR 'REFERENCE: ARC'JII'V~S BP'CASED HOLE FINAL LOGS BP EXDIOration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, .Alaska 99519-6612 (907) 561-5111 Date: 03/0.6/89 79871 The following material Is being submlf~ed herewith. Please acknowledge receipt by slgnlng a copy of this leveret and returning it to this office: X-02 collar 02/24/89 #I 9536-9908 Atla~ 5H Rece i ved Date Jennif~ Dietz I NFORHAT I ON CONTROL We I I Records LR2-~I Standard Alaska Production Company 900 East Benson Bouleva~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 23, 19 89 ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well X-2 (23-05-10-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. BJP:JAM Enclosures (g) cc: L. Burke (MB12-1) Well File Yours very truly, B. J-. Po~cky,-$~rvisor Waterflood & Miscible Flood A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Alter casing Repair well__ Change approved program 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 296' SNi., 383'EWL, SEC. 08, TION, RI4E, UPM At top of productive interval 2475' NSL, 2284' EWL, SEC. 05, TION, R14E, UPM At effective depth 2644' NSL, 2444' EWL, SEC. 05, TION, R14E, UPM At total depth 2659' NSL, 2458' EWL, SEC. 05, TION, R14E, UPM 12. Present well condition summary Total depth: measured 10460 feet true vertical BKB 9441 feet Operation Shutdown ~ Plugging Pull tubing ~ Variance '1 5, Type of Well: I Development x Exploratory Stratigraphic Service Re-enter suspended well Time extension Stimulate Perforate X Other 6. Datum elevation (DF or KB) KBE= 74.10 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-02 (23-05-10-14) PBU 9. Permit number 79-69 10. APl number 50- 029-20397 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 10397 feet true vertical BKB 9382 feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth True vertical depth - - BKB 110 20x30 10.6 c.y. 144 144 2655 13 3/8 4641 c.f. 2689 2689 9480 9 5/8 1463 c.f. 9514 8567 .. 1443 7 314 c.f. 9009-10452 measured 9768'-9833', 9854'-9880', 9891'-9901', 9911'-9926', 9944'-9965' true vertical subsea 8723'- 8903' (five intervals) Tubing (size, grade, and measured depth) 5 1/2"L-80 to 8868' with 4 1/2" tailpipe to 8974' 8107-9434 RECEIVED .... '~ii. ~ch0rage . Packers and SSSV (type and measured depth) 9 5/8" BOT 3H packer at 8868'; 7" Otis WD packer at 9930'; 5 1/2" SSSV at 2096' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation I I February 1989 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Status of well classification as: Gas Suspended~ Title Supervisor Watedlood/Miscible Flood FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance Mechanical Integrity Test Approved by order of the Commission Form 10-403 Rev 06/15/88 I Approva~ No. ~_O 7 ~ ~sequ~e~t for~re~L10- ~/o '-/ ~~/~~ (~~ ~~~,~CommissiOner ~:',P~' oved Copy Returned SUBI~IT IN :I/RIPLI~ATE WELL X-2 ¢23-05-111-14~ PBU ADD'L. PERFORATION PROPOSAL We propose to perforate the following Sag River interval during February 1989: 9650' - 9678' MD BKB (Ref. BHCS, 11/21/79) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 1/18/89 FLOW TUBES & PACKOFF FLOWLINE FLOWLINE VALVE BOWEN PACKOFF ~- HAND PUMP GREASE SEAL FLOWTUBE GREASE LINE RISER GREASE MANIFOLD · GREASE PUMP ..-,'-GREASE RESERVOIR BOP INDEXED DALL;XS ARCO STANDARD Ci-IF.~ON ALASKA PRODUC'[ION E~"KON Date: 02/12/88 TEXACO TO: TI: 78547 MOBIL PHILLIPS REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submltCed herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: :, A-26 01/27/88 Static Survey GO A~29 01/30/88 " " Camco A-32 01/28/88 " " GO B-20 01/28/88 " " Camco B-29 01/27/88 " " GO C-I2 01/31/88 " " Camco C-35 01/31/88 " " Camco G-19 02/01/88 " " GO G-26 01/30/88 " " -Camco H-22 01/25/88 " " Camco J-21 01/29/88 " " GO N-22 01/24/88 " " Camco S-18 01/30/88 " " GO U-8 01/23/88 " " Camco 01/24/88 " " Camco X-7 01/27/88 " " Camco X-27 01/26/88 " " Camco Y-2 01/09/88 " " Camco Oil & Gas Cons. C0mmiss[cn Victoria Aldridge INFORHATION CONTROL Well Records LR2-1 Standard Alaska ~ Production Compa~ 900 East Benson BouI~,ord P.O. Box 196612 Anchorage, Alaska 99519-6612 /907) 561-5111 STANDARD ~ ALASKA PRODUCTION August 27, 1987 Alaska Oil & Gas Conservation Commission 3001 pOrcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well'X-2 '(23'05-10'114) 'PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB: JAM~ pervisor Production Operations Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 X-2 Well File RE£EI EI) AUG 2 8 1~-1 Alaska Oil & Gas Cons. Comm~ssior~ Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. L STATE OF ALASKA O(. AL .,A OIL AND GAS CONSERVATION C .,IISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate ~ Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 296' SNL, 383' EWL, Sec. 08, T10N, R14E, gPM At top of productive interval 2475' NSL, 2284' EWL, Sec. 05, T10N, R14E, gPM At effective depth 2644' NSL, 2444' EWL, Sec. 05, T10N, R14E, gPM At total depth 2659' NSL, 2458' EWL, Sec. 05, T10N, R14E, UPM 5. Datum elevation (DF or KB) Y. BE = 74 10 6. Unit or Property name Prudhoe Bay Unit 7. Well number ×-2 (23-05-10-14) PBU 8. Approval number 7-536 9. APl number 50--029-20397 10. Pool Prudhoe Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 10460 feet 9441 feet BKB Plugs (measured) Effective depth: measured true vertical 10397 feet Junk (measured) 9382 feet BKB 12. Casing Length Structural -- Conductor 70 ' Surface 2649 ' Intermediate 9474' Production -- Liner Perforation depth: Size Cemented Measured depth True Vertical depth BKB 20"x30" 10.6 c.y. 110' 110' 13 3/8" 4641 c.f. 2689' 2689' 9 5/8" 1463 c.f. 9514' 8567' 1443' 7" 314 c.f. measured 9768' - 9965' '(five intervals) true vertical (ss) 8723' - 8903' Tubing (size, grade and measured depth) 5 1/2" L-80 to 8868' with 4 1/2''~ tailpipe to 8974' Packers and SSSV (type and measured depth) 9 5/8" BOT 3H packer at 8868': _ Stimulation or cement squeeze summary See attachment Intervals treated (measured) 9009'-10452' 8107'-9434' Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 3750 10193 5524 0 259 3710 10368 63117 0 271 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15.1hereby certify that the foregoing is true and correct to the best of my knowledge ~ ~'-~'~t I Submit in Duplicate Well X-2 (23-05-10-14) PBU STIMULATION OPERATIONS A scale inhibitor treatment with EDTA preflush was performed August 16, 1987 on the following perforated intervals in Well X-2: 9798' - 9833' MD BKB 9854' - 9880' MD BKB 9891' - 9901' MD BKB 9911' - 9926' MD BKB 9944' - 9965' MD BKB The treatment consisted of pumping the following via coiled tubing: 10 bbls. diesel preflush w/mutual solvent 2000 gal. EDTA solution 43.5 bbls. scale inhibitor solution 200 bbls. seawater overflush The treatment fluids were displaced to the perforations with 227 bbls. dead crude. Following the treatment the well was left shut in for 24 hoUrs, then returned to production and tested. Alaska Oil & Gas Cons, Commissio; A,r~chorag9 jm 8/25/87 Standard Alaska ,~ Production Compa{ 900 East Benson Boc$~ .~rd P.O. Box 196612 Anchorage, Alaska 99519-6612 /907) 561-5111 August 14, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well X-2 (23-05-10-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM~ Enclosures (9) cc: J. L. Haas (HB12-1) X-2 Well File ~oagrgProduction Operations RECEIV£D AUG 1 ? 1987 Naska 011 & ~as Cons. Commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. A(,~' STATE OF ALASKA ~ AL .,A OIL AND GAS CONSERVATION CO .ISSlON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [~ Pull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 74.10 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 296' SNL, 383' EWL, Sec. 08, T10N, R14E, UPM At top of productive interval (top Ivishak/Sadlerochit) 2475' NSL, 2284' EWL, Sec. 05, T10N, R14E, UPM At effective depth 2644' NSL, 2444' EWL, Sec. 05, T10N, R14E, UPM At total depth 2659' NSL, 2458' EWL, Sec. 05, T10N, R14E, UPM 7. Well number X-2 (23-05-10-14) PBU 8. Permit number 79-69 9. APl number 50-- 029-20397 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 10460 feet Plugs (measured) 9441 feet BKB Effective depth: measured true vertical 10397 feet Junk (measured) 9382 feetBKB Casing Length Size Structural -- Conductor 70 ' 20"x30" Surface 2649' 13 3/8" Intermediate 9474' 9 5/8" Production -- Liner 1443' 7" Perforation depth: measured 9768' - 9965' true vertical (ss) 8723' - 8903' Cemented Measured depth True Vertical depth BKB 10.6 c.y. 110' 110' 4641 c.f. 2689' 2689' 1463 c.f. 9514' 8567' 314 c.f. (five interv~is) Tubing (size, grade and measured depth) 5 1/2" L-80 to 8868' with 4 1/2" tailpipe to 8974' Packers and SSSV (type and measured depth) 9 5/8" BeT 3H pkr. @ 8868'; 7" Otis WD pkr. @ 9930' 12.Attachments 9009'-10452 ' 8107'-9434' RECEIVED, AUG ! 7 ]987 Alaska U~i & Gas Cons. C011~011 Anchorage ; 5 1/2" SSSV at 2096' Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation Auqust 1987 14. If proposal was verbally approved Name of approver Date approved 15., I hereby certify that the foregoing is true and correct to the best of my knowledge Sighted ~/~, ~u, Title Su~)ervisor Production Operations Date ~.1]'~7 , /d. A. ~ragg ,~' Commission Use Only Conditions of approval Approved by Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Commissioner IApprova, NO.7'" -~'-3~ by order of C~ the commission Date ~, / 7'-~/71 Form 10-403 Rev '12-1-85 Submit in triplicate{~' Well X-2 (23-05-10-14) PBU STIMULATION PROPOSAL A scale inhibition squeeze with EDTA preflush is proposed for the following perforated intervals in Well X-2. 9798' - 9833' MD BKB 9854' - 9880' MD BKB 9891' - 9901' MD BKB 9911' - 9926' MD BKB 9944' - 9965' MD BKB The treatment will consist of pumping the following via coiled tubing: 10 bbls. diesel preflush w/mutual solvent 2000 gal. EDTA solution Total volume of scale inhibitor solution 200 bbls. seawater overflush The treatment fluids will be displaced to the perforations with dead crude. Following the treatment the Well will be left shut in for 24 hours, then retUrned to production and tested. RECEIVED AUG 1 7 1987 Al~ka Oil & Gas Cons. Commission Anchorage jm 8/6/87 Coiled Tubing Blow-Out'Preventers Coiled Tubing Pack-Of'f ~ ,~ Blind Rams · CUtter Rams (~~-~~2' Chicksan (Kill Line) Slips Pipe Rams Pump-In Sub (Circula te/R e turns) ell Head Swab Valve RECEIVED AUG 1 7 1987 Alaska Oil & Gas Cons. Commission Anchorage Standard Alaska Production Compart~r' 900 Eot! Benson Bou~ d P.O Box 196612 Anchorage. Alaska 9~519-6612 (9071 564-51 INDEXED STANDARD ALASKA PRODUCTION DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA Date: 08/05/87 TO: TI: 78106 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is belng submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to this office: A-1 A-22 A-26 A-29 A-32 A-35 D-9 D-25 D-26 D-27 D-28 D-29 G-19 G-25 G-31 H-21 H-22 H-24 H-26 J-22 U-2 U-6 U-8 U-12 X-2 Y-l-2 07/09/87 Camco Static Gradient 07/12/87 " " " 07/09/87 " " " 07/11/87 " " " 07/13/87 " " " 07/13/87 " " " 07/21£87 " " " 07/10/87 " " " 07/10/87 " " " 07/07/87 " " " 07/22/87 " " " 07/22/87 " " " 07/08/87 " " " 07/08/87 " " " 07/07/87 " " " 07/25/87 " " " 07/25/87 " " " 07/25/87 " " " 07/25/87 " " " 07/27/87 " " " 07/17/87 " " " 07/17/87 " " " Il II It 07/16/87 ,, "/~ /)" 07/15/87 "/~ '~-,~m~J~" / '/ 07/27/87 Rece I ved · 5'o I I NF ORMA TI ON CONTROL Dat'e ' ,.,_~i~.e,_[0~ We I I Records LR2- I ,, .... .o..~. o,.~.,,., s .... ;,..,, ~.,¢o. ~s~Oil & Fou-de(f m Cle~,e'lond. I NOEXED DALLAS ARCO STANDARD CHEVRON ALASI, PRODUCTION EXXON Dote: 91/08/87 TEXACO TO: TI: 77647 MOBIL' PHILLIPS :. Page 2 of 2!! STATE OF ALASKA REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by slgnlng o copy of this letter and returning It to this office: R-1 Static. Gradient 12/14/86 Camco ~R-16 " " 12/14/86 " R-19 " " 12/13/86 " R-23 " Survey 12/15/86 GO ---' S-1 Static Gradient 12/17/86 Camco S-2 " " 12/17/86 Camco ~S-10 " Survey 12/19/86 GO S-10. " Gradient 12/16/86 Camco S-13~ Static Survey 12/14/86 GO ~"~-19 " Gradient 12/05/86 Camco ~-S-20 " " 12/07/86 Camco ~'X~2 " " 12/26/86 Camco ~X-5 " " 12/20/86 Camco Y-2 " " 12/20/86 Camco Y-8 Static ..... 12/07/86 GO PLS-Pr. es. Survey Victoria Aldridge I NFORMAT I ON CONTROL Wel I Records LR2-1 S, tonclo~d P~o~uct~on INDEXED TO: DALI.~S ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES (Transmittal Only) STANDARD ALASKA PRODUCTION Date: O]/08/87 TI: 77647 Page 1 of 2:! REFERENCE :* SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by slgnlng a copy of this let-ret and returning It to this office: -"A- 1 Static Gradient 12/28/86 Camco "'~A-5 " " 12/28/86 Camco '" A-22 " " 12/25/86 " ~A-26 Static 12/22/86 GO -'--A-29 Static " 12/26/86 Camco -~-A-30 Static 12/23/86 GO ~A-32 " " 12/23/86 Camco ""A-35 "' " 12/25/86 " ~-B'i " " 12/27/86 " -"~C-15 Static 01/02/87 GO ~'~-C-32 " 01/02/87 GO -~-D-9 " 12/30/86 " ~D-10 " 12/30/86 GO ~G=30 " 11/24/86 Camco ~M-4 " " 12/11/86 Camco ~M-10 Static Survey 12/11/86 GO ''"'M-16 Static SurVey ~' 12/11/86 GO ~M-19 Static Gradient'- 12/12/86 Camco ~'M-21 Static Gradient 12/11/86 Camco ~N-7 " " 01/02/87 Camco ~N-9 " " 12/13/86 Camco -N-15 " " 12/12/86 Camco ~N-18 Static Survey 12/12/86 GO ~"--N-19 Rece I ved Static ~~~~2~~/~ Vic toria Aldlidge Wel I Records LR2- I INOEXED TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS GEOSCIENCES ~'FANDARD ALASKA PRODUCTION Date: 06/09/86 1'/': 77104 Page 1 of 2!! REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please ocknowledge receipt by signing a copy of this lei-tar and returning It to this office: A-1 Static Gradient 05/18/86 Camco A-5 " " 03/22/86 " A-31 " "& BHPD 04/08/86 Otis A-34A " "&" 04/09/86 Otis ~.-:~9'''~ " "& " 05/17/86 GO A-35 Pres. BU Survey 05/15/86 GO B-1 Static Gradient 05/15/86 Otis B-2 " " 03/17/86 Camco B-23 " " 05/21-22/86 Camco D-6 " 03/14/86 GO D-19 " " 03/23/86 Camco D-19 BHPD & Survey 04/29/86 Otis D-23 Static Gradient 05/23/86 Camco E-1 " " 03/14/86 Camco F-4 BHP Survey 04/03/86 Otis F-10 Static Gradient 03/23/86 Camco F-24 BHP Survey 04/04/86 Otis H-26 Static Gradient 05/25/86 Camco H-27 " " 05/25/86 Camco K-8 Static Survey 03/26/86 GO M-5 BHP Survey 05/18/86 Otis M-17 Static Gradient 05/06-07/86 Camco N-4A " " 03/20/86 Camco N-20 BHP Survey 04/05/86 Otis N-20 BHPD & PBU N-22 BHPD Rece I ved Date Victoria~r ldge INFORP,~/IO CCT~ROL Wel I Records LR2-1 LR2-1 06/09/86 T~77104 Page 2 of 2!! R-23 Flowing Cradient 05/11/86 N-22 BHPD & PBU 05/15/86 S-8 Flowing Gradient 03/13/86 S-lO " " 05/17/86 S-13 " " 03/16/86 X-2 Static Gradient 05/26/86 · Y~-~ Flowing Gradient 03/26/86 X-9 Static Gradient 05/19/86 X-25. " " 05116/86 Y-2 BttP Survey 04/07/86 Y-9 BHP Survey 05/15/86 CO Camco Camco Camco Camco Camco Camco Camco Camco Otis Otis Victoria Aldridge LR2-1 SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EXXON 31 1 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 To~DAL/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATEOFAK BPAE Date: 04/18/86 T#: 77007 GEOSCIENCES REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this lett.er and returning it to this office:- DAL/STATE/UNIT/GEOS.: ~D-24 '"'~- D-25 ~H-24 H-26 ~S-14 GCT Survey 01/08/86 Hi Sch - GCT Survey 01/30/86 H1 40-10850 Sch 5" GCT Survey 02/06/86 #1 0-10089 Sch 5" GCT Survey 12/14/85 H1 50-9408 Sch 5" EPL 10/15/85 #2 9400-10000 Sch 5" EPL t2/21/85 #2 10100-11075 Sch 5" EPL I2/08/85 H1 9600-9920 Sch 5" EPL 12/03/85 H1 9500-9900 Sch 5" IV Anchoraoe RECEIVED Victoria Aldridge LR2-1 INFORMATION CONTROL WELL RECORDS LR2-1 INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON To:SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) 3111 °'C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 1-08-86 T#: 76682 REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- / C-20 12-21-85 ~.' B-24 12-22-85 ?H-6 12-25-85 /M-5 12-18-85 /M-16 12-19-85 ./M-21 12-20-85 /R-10 12-15-85 .R-10 12-15-85 /R-13 12-18-85 /R-19 12-17-85 zX-2 12-20-85 /'Y-12 12-25-85 ,/Y-13 12-24-85 Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco Static Gradient Camco RECEIVED DATE Cathy Perkins LR 2-1 Technical Documentation Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 November 13, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage' Alaska 99501 Attention: Mr; C, V, Chatterton Well X-2 (23-05-10-14) PBU Gentlemen: Enclosed in duplicate' are the following forms for the above-named well~ l; Form 10-407, Completion Report 2. Form 10-403' Sundry Notice and Reports on Wells 3, Form 10-104, Monthly Report of Drilling and Workovers MDM g/1026N4 Enclosure CC' T. N. Tyler. Well Records Drilling Well File #17 Very truly yours, SOHIO ALASKA PETROLEUM COMPANY M. a. Martin Seni or Petrol eum Engineer RECEIVED NOV Alaska 0il & Gas Cons. Oommissior~ Anc~oracje WELL COMPLETION OR RECOMPLETION REPORT AND LOG ' 1. Status of Well Classification of Service Well OIL ~;] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number SOHIO ALASKA PETROLEUM COMPANY 79-69 . 3. Address 8. APl Number P.O. Box 196612. Anchoraae. Alaska 99519-6612 50-029-20397 4. Location of well at surface 9. Unit or Lease Name 296'SNL, 383'EWL, Sec. 8, T10N, R14E, UPM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 2513'NSL, 2320'EWL, Sec. 5,.T10N, R14E, UPM At Total Depth 11. Field and Pool 2659'NSL, 2458'EWL, Sec. 5, T10N, R14E, UPM Prudhoe Bay 5. Elevation in feet (,indicate KB, DF, etc.) J 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 74.10' AMSLJ ADL 28313 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 11-3-79 11-19-79 3-18-80J feet MSLJ One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MEH-TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10460 ' MD 9441' TVD 10397' MD 9382 ' TV£ YES [~ NO []J 2096 feet MD 2095 ' 22. Type Electric or Other Logs Run DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, HD~, Cyberlook 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 2~"×.q0" TT3.m~]~'_n(! P.~duct~)r ,qu~"¢nc~ 1l~ ~R" ]O.R cu vd~ Arct~;~et concrete ]q-q/R" 77~ T,-RR .qu~c~ ?.RRg'J ]7-]/?." 4641 cuft Permafro~;t II Q-q/~" 47.~ L-80 Surface . 9514'i 12-1/4" 1333 cuft Cla~.~ C~-. 130 cuft · Permafrost 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD r1~v'Ds S SIZE DEPTH SET (MD) PACKER SET (MD) Prudhoe Oil Pool Top: 9758' $723' 5-1/2" 8974' 9929' Bottom: 9965 ' 8903 ' 9768'-9833' BKB (8723'-8782' TVDss) 2~. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9854' -9880' BKB (8801'-88.25' TVDss) DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED '9891'-9901' BKB (8835'-8844' TVDss) 9911: -9926' BKB (8853'-8867' TVDss) 9944'-9965' BKB (8884'-8903' TVDss) - · .. . 27. PRODUCTION TEST Date~First Production .. .' -. J Method of Operation (FIowing,.gas lift, etc.) I · 3-18-80 Gas Lift .. Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO ' TEST PERIOD Flow Tubing Casing Pressure CALCULATED=~, OIL-BBL GA~-MCF, WATER-BBL . OIL GRAVITY-APl (corr) · Press. '~ ::, 24-HOURRATE "11' .. . .. , 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · ' " ECEiVED -: · , . . Alaska 0il & Gas Cons, C0mmissi0~ : Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30; GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB Subsea Sag R. SST. 9651' 8617' Shublik 9678 ' 8641 ' Ivishak 9762 ' 8717 ' , 31. LIST OF ATTACHMENTS '. 32. I hereby certify that the foregoing is true and correct to the best <~f my knowledge Title Sr. Petroleum' ~ Date Eng~ n~r INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log' on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for Separate production from more than one interval (multiple completion), so state in item 16, and ir~ item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 J, A. Fouch~ President Mr. Gary Plisga Sohio-BP, Alaska 3111 C. Street Anchorage, Alaska 99503 December 13, 1979 Re: Our Boss Gyroscopic Survey Job No. Boss-16505 Well X-2 Prudhoe Bay Field North Slope, Alaska Date of Survey: December 7, 1979 Dear Mr. Plisga: Please .find enclosed the "Original".and sixteen(16) 6opies'of our Boss Gyrosc°PicMultishOt Directional Survey on the above well. · Thank you for givings.us-this opportunity to .be of service. Yours very truly, SPERRY-SUN, INC. Ken Broussard District Manager m/kc Enclosures. ANCHORAGEs, ALASKA SOHIO .... BP .ALASKA PRODUCTION DIVISION ........ ~ [.ATE OF ,SURVEY DECEF',BER Y-2 CO~:PUTATInN DATE , ~ ..... ~ ......... ~. ' ............ .~S GYR-~scoPIc sUAVEY PPUDHOE PAY DECEMBEP 10, ~979 UOF NUMBER BOSS-16505 ALASKA KELLY _.~.USg~N~ ..~LE~y .... : 7q.lO FT. MEASURED DEPTH ,.= ...... ]'.RUE .............. .;_. S UB.-S g A._ .: ........ _C..O.U R.:S~._:.--_C.OU R S.E ............ D OG..,L EG ....... ;.--:_..., ......... ?Q..T_ A_L VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY. RECI~NGULAR COORDINATES VERTICAL DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTION 100 100.00 25.90 O 16 N 56.29 E .27 .13 N .19 E °22 .............. 2..00_.-i_, .....2..00.00 ............._12.5,~..0. ......... 2. ..... 1...3_ ............ .~ .60..8.9.'E ......... _~ ....... -.._26 .......... _,_1.7 _N .............. ,.55_..__E ............. .45 300 300,00 22.5,90 0 15 $ 13,39 E ,19 .1~ S ,77 E ,33 400 ~00.00 525.90 0 27 S 28,89 E ,22 .69 S 1.01 E .0! ............ 5.00 ............... ~+9.9..99 ............ ~25..._.~.~ .... o..2.8 ........ S ~3.10 £ ......... .1: .... 1.3.~ _s_ ........... 1...9.8_ _E_. .......... -.24 ..... 600 599.99 52'5,89 ,3 28 $ 56,8? E ,11 1,,85 S 2,!0 E -,'"¢.1 700 699.99 625.~9 0 30 S 70.89 E .12 2.22 S 2.¢,5 E -.IR .......... 8_0_0 ................. 7_99.98 ............ 725.~8 ..... 0 ....2Y ........ =.~._.8_0_,50 ~ .... . .0g ......... 2,?..3....S ............ _3.65 F .11 900 899.98 825.88 O 30 S 84.89 E ,06 2.53 S 4'.47'-E .... .50 lOCO 999.98 925'.88 0 29 S 76.59 E .07 2.67 S 5.32 E .87 1100 ........ 1099..°7 1025.87 0 26 ~ 72.89 E .C6 2,88 S 6.9q E' 1.1~ 1200 1199.97 1125,87 0 q2 S 62. 9 E ,29 3,2i S 6..o9 E 1300 1299,96 1225,86 0 37 S 64,59 E .09 3,79 S H,01 E ............ i,t.o.o ......... i 39~. ~6 .......... 1 ~.25,,_~.6 ........ '_.o .... 3__~. ............. ~ _7_~_....~.o_~,..E .... ~_: .............. : ?~ ................ q. 12 s 8.82 E i .70 1500 1A. 99,95 la~25,85 0 10 S 8,69 E ,35 ~,36 S -~,16 E 1,-70 1600 1599.95 1525,85 0 16 S ,1~,80 E ,lO' ~.73 S 9.2q E 1.4q .......... 1.7q.0 ........... _16.99.95 ............ 1.625.8.5 ......... _0_ .... !.5_ ............. $.. 267_!.0 E ............ *..9.5 .............5..15 S 9,40 E 1.1.~ 1800 1799.95 1725,85 0 19 S 3'7,30 E ,09 5,5'6 ~ ................ 9-;66 E 1900 1899.95 1825.85 0 21 S 59.89 E .13" 5.9q S 10.10 E ......... _200.0 .............. .1.~.9'.9..~.5_ ........... 1925,85 ............... O_ ..... _.l_~_ ......... ~ .... ..6.7..,..1.9..._E ................. ,..0_6 ......... 6.19 s ...... lO.60 E 1.03 2100 2099..05 2025. R5 0 17 S 75.19 E .04 6.3'6"'§ .... i1268'-E ................. 1.17' 2200 2199,9~ 2125,81t D 36 S 72, 0 E ,32 6,58 S 11,82 E 1,~1 2300 2294-94 2225,84 O 4& S 48,10 E .33 7,19 S 12.81 E 1,ap .................................. --,' - : ..................... r 2400 2399,92 2325,82 1 2 S 8.89 E ,65 8.-'; 5-3--.q ..... ~-3 ;'-q ~-- E ..... ,75 2500 2499,90 2425,80 i 28 S 17,80 E ,q. 7 10,64. S 1~,g8 E 2600 ....... 2599,87__. ......... 25.25.77 i 28.. S.. 9,69'E ,21 13,12 S la,Sg E -2,35 2700 2699,83 2625.75 '1- 28 ................ 'S'-'¥~"'5-'0"-' w ................. 2;'06 ...... 14,~.i-S ....... 13...~'~= t. ' .... -q. 17 2~00 2799.`80 2725..70 1 21 N 7. 0 W 2.05 13.68 S 12,lq E 2900 2899.69 2825.59 4 4 N 41,79 E 3.3q 9.86 S 14.36 E 3000 2999,33 2925,23 5 31 N 45,50' E ! '4-~- 3,85 S 20'-;i-5 -'~' -P,4-3"' SOHIO pD UDHOE _A._.L._~ s KA SPERRY-SUN NELL ~(J~'V-ETi-NG'~-"C~O'MP AkV ................ ANCHORAGE, ALASKA BP ~LASKA PRODUCTION DIVISION '' DATE BAY TRUE M'~"~'S-Ot~"E-D' .......... -VER-i'iCXL: ........ ~/'~RT i CA-L-" I'NCLiN ft·I O-N-:"E I:'~E'CT'I O~* SEVER l T~f .....~E C-T ANGU'L~-R DEPTH DEPTH DEPTH DEG MIN DEGREES 966/1 O0 NOR'IH/SOUTH PAGE 2. OF SURVEY DECE"qBED 7~ 197~ ....... ~'~DFCDU'TATION~' DA. TE~ ' EOsS '~YRoScoPi'C S'UR~Ey DECEMBER 10~ 1979 dOB NUMBER BOSS-16505 SUB-SEA COURSE COURSE DOG-LEG ' ' TOTAL C 0 OR D%~ N-A'~ E'~- ........ V E F T I C A L EAST/WEST SECTION *100 !::..: 3098,63 . :3024,53 ]200 3197,38 3123.28 ~300 3295.59 322I 3500 s~9~.o~ 3600 3587.81 3513.71 .... 3700 3683,82 3800 ~778.85 7. 51 ' N 43,,20 E ...... 10' 17' . 'N 36.20 E 2.67 16.68 N 11 23 N 34,2P. E 1,16 32,05 N 11 59 N :~. 9 E .6~ 48.91 N s 609 ,'i2' .................. i'7-"'":-7 :~7;"'-'~'~ ;~"~'-~-- ::, i .':Vi ........... i'i~" i ~'-"~- 3704.75 19' '8' N 35.90 E · 2.08 136.37 N 2R.26 E 19.92 38.21 E 35.61 49.02 E 6~ .24' £ --'-?'~ .g~'" 72.A2 E 46.84 86,~7 E 121,~1 120,5~ E 1RO,90 3900 4000 4100 A200 :4300 4400' '.: ~316,31 4242,21 :458 O. e399,99 . 4325.89 :.:.33 ..: 0700 4565.59 A4S1,49 4800 e647,78 4573.6~ 34 53 N 35.90 ..................... ~"~-8'b- ............. "~'?-2'~-','~ ~ .... ~ ~'5~' 7 t ........... 5C00 4811,74 4737.64 ~5, 5: · N :36.70 5100 489~'69. 4819.59 '~- 51 N 3872.58 3798.48 21 <36. E 55,20 E :. ·2,48 164.6~ N 140 80 E 215 69 3964.78 3890.68 23 54 N 35. 0 E 2.30 196.32 N- .............. i'g'~."6'~-~- ..... 254",~'5' 4955.34 3981.24 26 lq N 34,50 E 2.34 231,13 N 187,17 E 296.71 4144.27 q070,17 28 11 N 33,29 E 2.03 265,0~ N 212,65 E' ~2,~2 4-2'~'1",'~'~ ....... ~i5'?';-~-4 30:. ~3': ~'~T';~73--~ .............. ~';~7 .........~6-~"~'~-'~' ........:~'~';"9-? .... '~ ....... : ....... E 2.18 353.42 N 269.73 E 444.25 E :: ',64 398./47 N 300.86 E ,q, 99.00 E ....................... '67 ...... qA'~'i 3' N .........Z ~"2';' ?-i-'--E-. ............... 557~ ,'68' E .59 490.i2 N 365.45 E 6ii.12 E ,31 536.31 N 398.81 E 668.09 - E ......... .......... C ~ ....... : 8' 2", 4-3'- ~i .......... '~' ~'~'-2g'2' "~ ......... ~ 2'5; 2-'7' . E ,21 628,43 N ~66.8~ E 7P2,58 E ,2~ 67~,~1 N 501,05 E 839,87 5200 4975',7'0 ........~99i,60 ........ 5300 5057.63 4983.53 ~ .. I N 36. ~ E .2A 766.59 N 56g.06 E g5~.3a 5400 5138,95 5064,P5 ~6 lO N 36,A0 E 1.16 813,52 N 603,47 K 1012.57 B'-~'~ 6-:7:' ...... 52i 9" 39 ...... '" 51 ~5 · 2 5600 5299,62 5225.52 36 35 N 35.50 E ,44 909.78 N 673.59 E 1151.64 5700 .. 5579'66 5305.56 37. 5 N ~5.50 E .50 958.58 N 708,q0 E 11~1.59 ~' - ........ :580 O ........... 75'45'9~"3 q ............. 5 ~ 5900 5538,91 5~6~,81 37 18 N 35,50 E .13 1C56,97 N 778,84 E 13~2,59 6600 5618,27 55~q.17 37 3~. N ~75,70 ,. ~ .37 1106,~ N 81~,26 E 13~3,e3. ............. &~'bd ...... : ..... ~6'~?'"~7 ....... 5623.27 - 37 '47 ...... N"3~, 0 E ..... .23 ...... i1'~6;'02--'~ ......... ~;~ ...........~'~3~-;'~-'0 A~ CHORA~E,~ ~L/~SKA _SCH.I.O BP AL.AS~_A._PR...O.D~....UC_T[ON DIVISION ' . . DATE OF SURVEY DECEMBER 7, 197~ PPUDHOE BAY DECEMBER 10,, 1979 dOB NUNBER B0SS-16505 ALASKA ............................................................................................................................................................ K.EL..LY_A_us~_I NG' _E_I....E~y_,.__--_ _..Z.q, 1.0._ FT, . I.B_U.E ................... S U.B -_$_EA_ COUR~E~i:z COU R S_.E__. DOG-LEG TOTAL MEASURED VERTICAL VERTICAL INCLINATION gIRECTION SEVERITY RECTANGULAR COORDINATES VERTICAL DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST SECTI3N 6200 5776,33' 5702,23 37 55. N 36, 9 E ,i4. 1205,64 N 886,1"9 E 1~+9~-~ '7 6300 5855,01i 5780,94 38 16 N~5,79 E ,~0 1255,59 N 922,~0 E 1557,6~. ~O.Q ...... .:..._5~.~_,.aO ...........5:8.59.~.30 38 33 'N:~5,59 E ,31 1366,0~ N 958,65 E 16!9,75 6500 601~.60 5937,50 ~8 33 N 35.2~'-"~- ,19 1356,~'2 .... ~ 99~,78 E 6600 6089.87 6015.77 38 26 ~ 35. 9 E ,17 1407.68 N 1030,65 E ............ 610.0.-- .... ~1.68,36 ........... 6.09~,26 38 9 N_39_-7~_~ .................. -'-~.! ......... !9~.~-_~ N 10_~6,10 E 1806,2~ 6800 62~6.96 6172.86 ~8 13 N 3~.50 E .14 1509.39 N 11~1,20 1868,0~ 6900 6325,82 6251.72 ~7 ~ 7.000_ .......... L 6 ~0.5..,_1.9L.] ...... 6 331~,...09 37 15 19~B,~G 7100 6~8~,9~ 6610,8fl 36 57 ' 7200 6565,03 6490,93 36 37 2110,53 _~3.00 ..........66_A,~, 55 ........ ~.571 ~ ~ 5 36 8 216 9, 77 7~00', ~726,61 6652.51 35. 33 .... :. ... ~... E N 3~+oqO E .5~+ 1560.10 N 1135,99 E .... :...sO E .......................... .-_.19 ......... i_6 .........l! E N S.20 E N 20S.Z C N 32,70 E .~5 iTii.i~ N leS5.6~ E N 32. 0 E .64 1761,29 N 1267,~+3 g. N 31.39 E .6~ 1811.11 N 129fi,19 E 7500 6808.22 673q.12 35 ~ N 30.79 E .59 1860.60 N 132fl.Oq E 7700 6972,6~ 6898,58 3~ 16' N 29,70 E ,~9 195~,99 N 1385,2~ E 7800 7055.6~ 6981.5~ Z3 37 N ,30. 0 E .87 2007.A1 N i~13.03 [ ____ _7~_0_~ Zi_~.,l~ ........ 70_65,~0~ 3~ B N ~0.2~E ,50 2055.0~..N 1~0,62 E FO.O'O .r.~. '.:7223.30 71q9.20 32 ..15 N 30.20 E ,88 ......... 2-'i'~i,69 N 1~67,79 E 8160 7308.19 723~.-09 ~1. 3~ N 30,60 5 ,72 21~7,28 N 1~9~,53 E 22fi5.A8 2342,88 2399.26 2a~54,g..7 2509.67 2616,16 8300 7q79,71 8400 7566,46 7~92,36 29' 27 N 29,89 E ,75 8500 7653,70 7579 60 29 a - N 29,89 E 7519.5~ ................. ~!_,.~i ...... ~ .......... N. 29.89 E .66 2192.1~ N [520-70 E 2667.91 7~05.61 30 12 N "~"7~ .................. E ;"~'~' ......... 2"2"3~..'3-~-'N- -i5-~"~'¥~-~-'-~- ....... '~'-?i"~-;6 g6OO -'77~1,a, 8 7667.38 8700 7.830,03 7755-,9Z 8900 8008,62 793q ,52 9000 8098.56 8024.46 elOO 8188.99 811~,89 2279,45 N 2321,H2 N 27 12 N 29,.79 E ,97 2403,72 N ' 26 15 N 30.79 E .62 2~81,5~ N 25 35 N 31-70 E .78 2518,90 N 2~ 58 N 33,29 E ,92 255~.91 N 2~ 21 'N 33.90 E ,67 2589.67 N 9200 8279,87 8205,77 1570,78 E 276fi, lZ+ 1595,13 E 2~ 16,~.2 1641.98 E 2910.76 1664,6q E 2955,97 1687.26 E 1709.92 E 30~q.07 1732,85 E 308G,72 i'?~B'~-. ;~'-'E' '1-2' .................................................................................................. -~PERRY-SUN&~ELL ............................................................................................. SURVEYING CO?,PANY ~AGE-"-4'-' ANCHORAGE,, ALASKA SOHIO BP ALASKA PRODUCTION DIVISION X-2 CO P...FUTAT ION DATE PRUDHOE BAy DECEMBER 10, 1979 ALASKA ,, .................... ' .~_l'_.~_ U_ E .....sUB-sE'Ai': : "'COURSE. ....... _DOG-LEG couRsE MFASURED VERTICAL VERTICAL INCLINATION ~IRECTION DEPTH DEPTH DEPTH DEG N,.IN DEGREES DATE OF SURVEY DECEME'ER DC, SS GYROSCOPIC SURVEY dOB NUMBER BOSS-16595 KELLY BUSHING ELEV, = TOTAL SE V ER'I-'TV ..... ~ E C ~'~'~"OiJ A ~ COORDINATES DEG/1 OD NORTH/SOUTH EAST/WEST 7, 1979 74, lO FT. V-E-R'T I CAL"' SECTION 9300 8371.1A 8297.04 23 52 9AO0 8462.7A 8388,6A 23 26 ~500 855~,~4 8480 24 2.3 52 0600 8645,24 8571.1A 25 23 ~700 87~5,~7 8661.27 25 58 9~00 8825,85 8751,75 24 25 ~900 8917,30 -' 88A~,2D 2~ 18 10000 9009,55 8955,~ 22 8 N 36.~0 E .7A 2655.97 N 1802.38 E 320~.37 N 37.29 E .5-6 2688.07 N 1826.4A E 32~9.47 N ~ Z · A"O--'t ................ ~.~9 ......... 2'Y'e'b';'~'4 ~ ........ f8 522 ~ N ~4. 9.E 1,30 2752,04 N 1882,27 E 3333,91 N q3,70 E 1,56 2782,71 N 1911,79 E 3375,97 ':'- N"'~2.20 E 1,30 28~0.20 N 1966.05 E 3~5q.~1 10100 9102.40 " 9028'. 30 21 10200 9195,71 91'21,61 20 10300 9289.77 9215.67 18 10375 9360,79 9286.69 18 10~60 94~1.36 9367.26 18 25 :.~...'N,i,-43,40 E .8~ ' 2867.42 N 1991.25 E ~,~ '~-~-T3";'~ d-"-~ .................. ; ?0' ....... ~'~'~'~-'~'N ....... ~"~"1'~6 E 55 N 44, O E 1,85 2918,24 N 2039,19 E 35 .N Aq,79 E ,56 2935,47 N 2056,06 S HORIZONTAL DISPLACEMENT : 3610'60 ~F'E'E.T AT NORTH~ 35 DEG, 4 MIN, EAST AT MD = 10460 3490.~6 352 6.56-'- 3.569,11 35R3,90 3610,60 THE CALCULATION PROCEDURES ARE BASED ON'THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD· SPERRY-SUN WELL SURVEYING COFPANY ANCHORAGEe A'L ASKA . _SCHIO.BP._ALASKA.PRODUCTION DIVISION DATE OF SURVEY X-2. PRUDHOE ALAOKA~ BAY .... P~F-. E 5 ; DECEMBER 7, 197e COMPUTATION D~TE DECEMBER 10, 1979 ,JOB NUMBER BOSS-16595 KELLY BUSHING ELEV, = 74,19 FT, --'. ...._-I_NIERROLA..T..E...g_VBLUES_ E_QR.. 5'V.~E,N.:i. O0~O.....~-~ EE_T._. OiF_...~...KA_.S_U.R. ED... DEP_T_H TRUE SUB-SEA ~.E.A$ U.R~ED V.E_BZ. ILCA].. DEPTH DEPTH DEPTH .- . .......... .~ ...... ~_O...d '?.s..=..,. :9..',_.0. 01__ - 74 · 10 lO00 999,98. 925,88 2000 1999.95 1925.85 ............. ~..C, ~O. 0 ............. 29.99_ TOTAL R.E_C_T_AN_~U L_A.R ~ __c. 0 o R D IN A ~ ES M.D-TVD VERTICAL NCRTH/SOUTH EAST/~EST DIFFERENCE CORRECTION "O.O0' ' '" 0-'00 ~. ~?~... :t: .... 2.67 S-- 5..~2 E --';-0-2 .02 s i0.6o E .as 5.85 S 20.15 E ,67 .61 '..4000 -'396A.78 3890'68 196.32-N-":~~3.'O3'.E 1610,56 N 21 O1,69 N 25.18 ..,~_~. N 2~0,20-. N THE CALCULATION PRCCEDURES ARE BASED 7000 6z+05.19 6.331.09 8000 7223-30 71A9.20 ................ 9~0.0.0.' ............ 809.8 '= · ...,6 ................ ...8.02 g., 46. I O'O00 9009'53 8935, q'3 lOq60 9q~,36 9367,26 35,22 34,55 188,26 153,0z~ 381,73 195.~7 1A67,79 E 776,7.0 181,89 ~7 0..9. 9.2. ._.~. ................. .~..0!_,.4_.9 ....................... ..1_..2...%,_.7_ .~ ................ . ...... '~, 'i966, 05 E 9SO.Zt7 89.02 .',.~ -2075.1q .E 1018.Ga 28.18 THE USE OF THREE DIMENSIONAL , . _ RADIUS OF CURVATURE ME?'~'(~D'~- ............ · :: -;::.:...: :: <;::. . ×-2 PI~ UDHOE BAY ?_ LA.S. K A SPERRY-SUN WELL. SURVEYING COMPANY AN'CHO R AGE, 'A L ASK A :: , .: . . . , ....... COMPUTATION DATE DECEMBER 109 1979 DATE OF 'SURVEY DECEMBER 79 1979 ,JOE- NUMBER BOSS-16505 KELLY BUSHING ELEV. = 7Q.1C FT. TRUE SUB-SEA MEASURED VERTICAL VERTICAL TOTAL RECTANGULAR COORDINATES SUB-SEA DEPTH MD -TVD VERTICAL ~.,EPTH DEPTH DEPTH . . ..... i'?/ o ~. o.oo - -7~,'.I NORTH/SOUTH '-:,: EAST/WEST ] /. :.,: · . .~ . 74 74.10 0.00 .06 N .09 E 17q 174.10 lDO.D0 .21 N ' .47 E 27~ 27q.10 200,00 .05 S ,Tq E -..'--'.' .., 374 37A.10 300'.00 -52 :.,47~ ~7~.io .::; ~oo..oo 1.18..s ..... ::._.~;,. 57457~,.z0.'~.~.; -.-'"~500,00 - z,7~.?S ' 67~ 674.10 600.00 2.15 77~ 77.~. 10 709.00 2.39 "~:.107~ 107A.10 .:;;',;'.'.~,1000.00 2.82.:~S ';?~"-':~: 5.90 E 1'1:7 A 117~,10 "'J~i 100. O 0 3'.13'~.S,..:/:.~,:~ 6,71 E 127~ 127a.10 1200 O0 DIFFERENCE 0 · 0.'0 .00 .00 ,00 .OO ;01 o01 .01 .02 .02 .02 .0~ .04 CORRECTION ,00 ,00 .00 .00 ,00 ,.00 .00 .0'0 o00 o00 1374 1374.10 1300.DO ~74 z,,74.zo 1~oo.oo 1674 1674.10 1600.00 177z~I,] .'>,:,1774,10 1700.00 4.07 S 4.61 5-o5.- s 5.45 8.66 E .04 · 9,15 E .05 g. 2 i ............................. ;'~'~ ..... ' E 9.35 E .05 9.58 E .05 .00 .00 ..00 .09 SPERRY-SUN WELL SURVEYING COMPANY PAG£, ~ PR UDHOE BAY ANCHORAGE, ALASKA ...................................... ~: .._D_~A. TE OF SURVEY DECEMBER 7, 197~ CONPU?ATION DATE DECEMBER 10, 1979 dOB hUMBER BOSS-16505 KELLY BUSHING ELEV. = ?~.lO FT. sUB .-_S LA._.D E_P_T.H . TRUE SUB-SEA TOTAL ..... M. EA_S.U~tEL_ VE~ J_ 'iCA.L ..... _V. E R !I..CAL ..... R_[.CI ~. N_~_u_LAR__ ,c~P Q _R..._D.! N_ .~. T.E_S ........... ~_D.__-__T V D ................. ._V__E_~ T_~ C AL DEPTH DEPTH DEPTH -': NORTH/SOUTH- EAST/~EST DIFFERENCE CORRECT]ON , . 197q 107/~. 10 1.900.00 207~, 207a.10 2000.00 21_7 q .227~ 2274.10 2200'00 2374 237~. 10 2-300.00 5.8G S 9.96 E .05 .00 6.I'~ S IO.~R E .05 .00 6.32 S 10.96 E .05 .00 6.. 5Q_.s. ......... 1.!,_56_.E ....................... ...0_5 ..................... :..00 G.gG S' 12.56 E .06 .01 8.07 S 13,38 E ,07 ,01 257/~ 257~,.10 2500.00 267q 2674.10 2600.00 .... P__7_7_~ ................ 277_~.., 1.0. .......... 270 O_ · O..Q '28 7~, 287q,. 10 2800.00 12.~7 S lq.q8 E .12 14,49 S lA.19 E -16 _. !.4L_,._2_8_,...~. .......... 12_-_. 2._.2.__._E .................... .19 11.11 S 13.3. q E .26 297~ 297q.I0 2900.00 5.56 S:.,~. 18.~2 E .55 ~.~..z5..._,:_._, ~.o_7.~._, 1.o._' .... .~__o. 0_0_, o__o~_ .--__ _.._'.; 2'_, 0_,3 N .... ..;:---._..':.". 29--:-~ !_ .[ ............... 3..-_!P ..... 3176 317a.10 3100.00 13.ql N 35..75 E 2.26 .O2 .07 .59 1.13 3278 327Q.10 3200.00 '28.q7 N Q6,59 E 3.97 1,71 . _ 338_0' 3374,10 3300,00 ' ~5,~5 N_t~ 57,99 E 6.0'5 2,07 ". !'.T:-:"T~"~'e ~':~'"~'~'~ :z o .......... ~'~0o. 0-o ................. .---~-~';-~¥ -~,;~1---:-'~'~-;¥-5-' ~- ................. ~.~ ......... ~;~ ............. '-..':..'s585'--::~'- '...' 357~,1o ~5oo.o0 85,~5 --N ~2'/~ ~j~s~ E: 11.69 3.~9 -.- ....... -- ..... ........................................... ....... . . _ ....... ; ............ " _ ..... ~. i~ ' ._.' ....................................... ......... -~- ...... :---'.----":'---:.~:-~:---:~., .... . :. "~ '" '' " ' ~V..~~',o,''''' ' - ......................................... . SP:£RR.¥-SU~WELL SURVE¥~N-~- ~-~'"~,-~-~'~'~'= . - ' "ANCHOR~ GE, A L/~SKA SOHIO BP ALASKA PRODUCTION DIVISION . ..:-?- ~i:. '. DATE OF SURVEY DECEMBER PRUDHOE BAY DECEMBER lOe 1979 dOB NUMBER B0SS-16505 ~LASYA KELLY BUSHING ELEV, = PAGE 7, 1979 7q.lO -: ,..' .. INTERPOLATED VA . f 1-00 FEET ..'OF SUB-SEA DEPTH TRUE SUB-SEA MEASURED VERTICAL VERTICAL TOT AL RECTANGULAR COORDINATES MD-TVD DEPTH NORTH/SOUTH'S. :'::':EAST/'WEST DIFFERENCE VERTICAL COR RE CT IO'N'~ DEPTH ,.,'<,:':-::.:".:':'.' DEPTH · .. ":::':'.:!<:i,:i::.::,, . .i.,' .-'. : .,-: :' ' · - ~'**::~: '? :::'~*'i:~". i'o-' :'::.:.,.:~ ;,oo.o o. 3901 387q,10 3800,00 AOIO 3974,10 3900,00 ~120 ~07~,10 ~0~0,00 5 · !..:S_ ................. 6.67 8.56 10.72 423.3 .... &.'417~.10. ::.' ":.qlO0:.OO 282.68 N '.'<:221'63 E ": ~3A. 9 -':i:i:A27~o1'0::: :':::':'4200, 00 331,I3 N :-:::'; .'._.':25:~,59E:-:' '"' 4589 ~7~,10 A400.oo ~39,17 N 329,22 E ~7i0 ~57~.i0 ~500.00 ~.~ ~ ~e.8~ E ~2 ~7~.10 .~00.00 55i.~7 ~ ~0~.57 E 59,90 75,76 9~,85 115,08 136,2.3 157,99 ~95~ A77~.10:..: 4700.00 6'07',2~ N .: 45I,:06~:<:E i!!ii:.:::. :::.. ~-7,~.91 13,09 15,86 19,10 20,23 21,15 21.76 21 -¸92 5076 487z~,.10 ............. . ........ ii..~.~ ........ _.'t_?..!_'+- i o 5320 507~.,10 54A3 517A. 10 .5568 5274,10 '"' 5693 5818 4800.00 qg'o0.o0 5000.00 5100.00 5200.00 -~3'~:~-'Ji~-:'--:.:' 53'o-o. o o- 547~.10 '"- :-5A:O0.0 0 557~.10 5500.00' 66.3,46 N W92,9'2'"E 719.A8 N -':.':.. 775o91 N 575.85 E 83~,23 N 618,72 E 894.36 N 662,59 E -;. 2g2.03 223.94 246.00 269.~5 294,11 955.16 N . lO16,fl3'N '1078,81 'N~'" ' 22 21 22 23 24 25 25 ,12 .91 .06 .66 .81 .52 .71 X-2 PPUDHOE BAY . . SPERRY-SUN WELL SURVEYING COMPANY? /INCH. ORA G. Ee AL/~SKA . . ALASKA PRODUCTION DIVISION COMPUTATION D/~TE DECEMBER I09 1979 DATE OF, SURVEY DECEMBER ,JOB NUMBER BOSS-16505 KELLY BUSHING ELEV, PAGE 79 19'/9 74,10 FT. . TRUE SUB-SEA TOTAL ..~_.~E~~~LEtLT_I.CAL.~V.E!!! I_.C_.A_L.__B._E CT A._N_.G_U L ~ R COORD IN ' 'DE'"P~TH':-i- ii~i'~.:~'i'"?-'?~.DE.pTH ' '--' 'DEPTH NORTH/SOUTH .... -'EASTZWE ./!..!i.~:i.: .~i:. ~._.. / ..~ :~ ......... . 6197 577A.10 5700,00 1.208.23 N 885. 632~ 587~. 10 5800.00 1267..78 N 931. _6.~.5~ ....... 5~._7A,i9__'__.__.5__9.0...~,_0~.__ 1332,4_3 N ~ 977, - ~:"~.79~....-':'.. .... ~o7,,.lo~?.' ~-:~-'~ooo,6'o' ~ ....... i-~'~'~'~-~' .~%~i,~:.~"[6~[ ''::ii":'"'i:~'i~.~-67O7.' 617q,lO"- .~.' 6100,00 ' ~ ' :~:L"' 6.8_~.-~:~ii] /:;:6~7-:_~?-.1_0~' '-~ .__6'2.0_0 ._ 0 O_.._ · 6960 6374.10 6300.00 7086 64.74'.10 6400.00 ......... i.. 72.1.L____.652;5.,.1.0. ' 650~_,.Q0 -.' oo.o, --...::, ..".TS~ ~ ,'~... 677~. ~0.~' 6700..00 -~518.~L./?-.L. ~AB 79.~.!.0'Z.j'~ ~';':~:~.-:--6 80 0 · 0 0 7701 6~7q.10 6900.00 7822 7074.10 7000. O0 I~62,21-' N '.':'~ii 1068, . 1527 00 N: :~'''-:::: 1113, · ._, 2~' :.-.:.:'".~ 1590,85 N 1156, 165A,~2 N 1198, 1716,86 N 1239,, 798_~ 717~.10 7109.00 207~.7! N ' 1~52. 8177 :'~-7374,10,-' 7300.00 2181.9-6 .N ,: 1514. 82_~.~ % ?~, ~Z~_7~~ _' -~..._~0 o_,~ o~ 2 3 ~, ~ ~'N :.-~: 15~ 4. ES MD -TVD ST'. '" DIFFERENCE · E?:': ..... ),396.45 17 E' 4.2.3.07 20 E 450.18 51 E A 77.9 _5_. ~5 E ·505.77 67 E ~,.'3.20~.,, 30 E 560,~4 VERTICAL CORRECTION - 26.30 26,61 27,11 27.77 27.82 27.q~ 27.2~ 9'2 E 586,85 26,~1 66 E 612,33 25,~8 3~ E 637.19 E - ........... '6'~-~ ;~_'~' ........................ ~ ,0 E 684.21 22.9 E~.. '~ 706.26 22,05 72 E 727 ;~"~-' 21 17 E 7~8,07 20.~5 09 E 767.63 19.56 e7 E ~ 7~5,'~ .... 8~ E 18,26 17.21 16.32 X-2 PR UDHOE ALASKA ' -- SPERRY-SUN..LWELL: SURVEYING COMPANY PAGE ?~ ~ 7.' ~, '"' ' · ANCHORAGE, ALASKA COPPUTATZOk DATE BAY DECEMBER lOe 1979 INTERPOLATED VALUES FOR EVEN~ I00 FEET OF.. SUB'SEA DEPTH JOP NUMBER ROSS-16505 KELLY BUSHING. ELEV, = 74.10 FT. TRUE SUB-SEA TOTAL M. EASURED VERTICAL VERTICAL RECTANGULAR COORDIN ATES WEST ~523 767~,10 7600.00 8636 7774,10 7700, O0 87~9 7870,10 78.00,00 .... 8861." :i 7974,10 7900,00 8972 ~074,10 8000,00 ~ . ?9'083 817Z+. 10 8100. O0 .. 9303 837~.10 8300.00 9 z2 AVA.ZO e oo.oo MD -'TVD D I K .C E VERTICAL CORRECTION · .: "834.68 15.26 2331.65 N 2378.55 N 2~23.33 N ... .91 N ~: !? '{?:".'?~508' 94-. N 1600,78 E 1627, 59 E 1 653.22 E 1678, 54 E :1.703, 77 E 1729, 05 E 2587.50 N 175A. f18 E 2624.A4 N 1779.75 E 2659,93 N 1805.30 E 849,24 14,56 862,9D 13.66 875,~3 12,53 919.57 · 929.13 938.28 11,98 11.37 10.70 10.09 9,56 9,14 i:'..9 5'21' 8574, °631 867~, g7~3 8774. 10 8600, O.O ~-.:;.- 27.30,51 N "'""186 10 8700,00 -....: 2765,56 N 189 .. i0 8800.00 2798,Aq N 192 9852 887A. 9961 897A,10 g900.O0 2829.52 N 195 10069 907q.10 9000,00 2859,36 N ' 19-8 ' 10176-":~' <~ 91~7q,10 9100,03 '-" 2887,65 N 20.1 _ 10283 '';~: '927A,10 9200.00 29.I~,38 N 2035, 6,5A 10389..,:,: ,-:937~.10 9300.00 2938.64 N' 2059,21, E lOll.gA 1,92 E 957.84 5, 36 E q68.96 6.37 E 9~7,65 3.62 E 995.50 q6 E 1 C~9.3~ 10.3~ 11.12 9 8.81 7,86 SPERRY ;~S ~~El~:'?iSU RV EY C.O FP ANY PAGE ...... _S/~I:LI_O___B P ~ A.t,,J~L$. K_A' LP g_Q_P..U_C,T.. I 0 N D IV I.S_.] 0 N X-2 PRUDHOE BAY '~i-: :' i./.i..AN£.H'ORAGE~ ALASKA :':-'i_. ': _'~'.,! _,'- TM :~ COMPUTAT ~ON DATE DECEMBER 10,~ 1979 DATE OF SURVEY DECEMBER dOB NUMBER BOSS-1.6505 KELLY BUSHINE; ELEV. = VERTICAI~ CORRECT. ION 79 TRUE SUB-SEA TOTAL .. MFJSHRF..n ....... ' VEE.TACAL_4~.V_ERT~I£AL. ~GIJLAP,. ~C.~.~ ]NATES MD-TVD "'. DEP.'tH"~..'~ ?::~-?::~:.?~??DEP T H::~::.:,:-~.~'. ::-;~.::~,.. :" DE P TH' "'. -':.::' NoR~,H/SOUT H .' :EA S T/WE S T .-:.D I FF:ERE NCE. .' :: ::,~ ~.'.~ '~?~;~.:::;~;~:~::~:~ ...... ~?.....,.'.~:::~/,' -:-~::.:.::. ::. · :, - :... ~,',~:.::~. ,~:::~'.' ..... · .:.:' ..: : ,., . . THE CALCULATION PROCEDURES USE A LINEAR"I'NTERPOLATION BETWEEN · r.. ~:'. _ .. . · . '.. ~..i ....- ~.}. g-, .. 3.70 1979 7~.10 FT. ALASKA L AND GAS CONSERVATION CO MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 79-69 3. Address 8. APl Number P.O. BOX 196612, Anchorage, Alaska 99519-6612 50-029-20397 4. Location of Well At Surface: 296" SNL, 383' EWL, Sec. 8, T10N, R14E, UPM 5. Elevationinfeet(indicateKB, DF, etc.) KBE = 74.10." AMSL 6. Lease Designation and Serial No. ADL 28313 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-2 (23-05-10-14) PBU 11. FieldandPool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations J~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional intervals were perforated October 19, 1985 using Schlumberger 2-7/8" Hyperdome.s at 4 spf. A lubricator was install.ed and tested to 3500 psi for all well work. 9768'-9833' BKB (.Ref. BHCS/GR, 11-21-79) 9854'~9880' BKB (. " ) An SSSV was set and tested in the ball valve nipple at 2096'. i .ECEiVED 1,~. ~ hereby certify that the foregoing is true and correct to the best of my knowledge. ' Title Sr. Petroleum ~.ng±neer '~he space below for Commission use Alaska Oil & Gas Col~s, Commissio Anchor'ag~, Conditions of APproval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA ' · ', ALASK~ )IL AND GAS CONSERVATION"'~' ,4MISSION ' ~' I ONTHLY REPOR1 OF DRILLING AND WORKOVER OPERATION . O,,Ihng well ~. Workover operation r-'J Name of operator SOHIO ALASKA PETROLEUM COMPANY 3. Address ?. O. Box 196612, Anchorage, Alaska 99519-6612 4. Loc~tion of Well at surface 296'SNL, 383'EWL, Sec. 8, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 74.10' ~MSL!, ADL 28313 Perm,t No. 79-69 8. APl Number 5°7 029-20397 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. X-2 (23-05-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of. October o 19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or Diner run and quantities of cement, results of pre~sure tests 14. Coring resume and brief description 15. Logs run and depth where run 6. DST data. perforating data. shows of H2S. miscellaneous data See Attached. R£CE VED Alaska Oil & Bas Senior ~e.t~01 ~m~ ~er OATE PERFORATING DATA - Well X-2 (.23-05-10-14) October 19, 1985: Rigged up Schlumberger and perforated the following intervals using 2-7/8" Hyperdomes at 4 spf: 9768'-9833' BKB (Ref. BHCS/GR, 11/21/79) 9854'-9880' BKB ( " ) October 23, 1985: Set and tested SSSV in ball valve nipple at 2096'. Well on production. SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CttEVRON EXXON TO~ SFO/UNIT/STATE: TE:LACO (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE 31 '11 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 11-13-85 TI/: 76564 REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ..~'12 10-06-85 EPL 9700-10200 Sch #1 2 v~-2 10-19-85 Perf Record 9600-9900 Sch #1 E!V. u Cathy Perkins LR 2-1 ] 3"' ~ Technical Doc~entation Records ~nagement Cons. SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 October 2, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage' Alaska 99501 Attention' Mr; C;V; Chatterton Well X-2 (23-05-10-14) PBU Gentlemen: Enclosed in triplicate, is Form 10-403' Sundry Notice and Reports on Wells, for the above named well; This contains our proposal to perforate additional intervals in this well; Yours very truly; Michael D. Martin Senior Petroleum Engineer MDM : kkm 092685: 0639N' 2 Enclosures cc' T. N. Tyler, (MBg-2) Well Records, (LR2-1) Drilling Well File #17 RECEIVED OCT 0 7 1985 Alaska 0il & Gas Cons. OofT~mission Anchorage ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~ OTHER [] 2. Nam~)fHojo(~ra~[aska Petroleum Company 7. Permit No. 79_69 · 8. APl Number 3'Addr~s2 O; BOX 196612, Anchorage, Alaska 99519-6612 so-029-20397 4. Location of Well At Surface' 296' SNL' . . 383' EWL, Sec. 5. Elevation in feet (indicate KB, DF, etc.) KBE : 74; lO' AMSL 8, TION; R14E, UPH 6. Lease Designation and Serial No. ADL 283l 3 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well N,~,~er_05_1 X-2 0-14)PBU 11. Field and Pool Prudhoe Bay Prudhoe 0i I Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate J~] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). , The following additional intervals will be perforated using Schlumberger 2'7/8" Hyperdomes at 4 s;p;f; A lubricator will be installed and tested to 3500 psi for all well work; 9768' -- 9833' BKB (Ref: BHCS/GR 11-21-79) 9854' -- 9880' BKB (Ref; BHCS/GR 11-21-79) An SSSV will be set and tested in. the ball valve nipple at 2096" RECEIVED. OCT 0 7 1985 Alaska 0il & Gas Cons. commission Anchorage ~~hereby c~~~ing~rect to the best of my knowledge. f~-~-~.-~._~ Title Senior Petroleum Engineer The space below for Commission use Date Conditions of APproval, if any: Approved by. Approved Co~y Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TEXACO TO: SFO/UNIT/STATE: (-Marathon) MOBIL' PHILLIPS _ - BPAE (Transmittal On!~)' , 3111 "C" STREET ANCHORAGE. ALASKA . TELEPHONE 1907i 265-0000 MAIL: POUCH 6-61 2 ANCHORAGE. ALASKA 99502 Date: T#: 08102185 76355 REFERENCE: · SOHI~~INAL DATA- PRESS .UP, E S..URVEY DATA. /~'oliowing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-7 Flowing Gradient A-10 J- " " X_l_~ ,, ,, X-2 --' " " X-14 -' " " Y-6 ~ ~Statib Gradient ~ II I1 Y-18 , 07/28/85 Camco 07/19/85 Camco 07/26/85 Camco 07/24/85 Camco 07/14/85 Camco 07/29/85 Camco 07/27/85 Camco RECEIVED DATE '~-~5 Technical Docuraen~a~ion Oil & Gas Cons. Comm~ssi°'R'''ec°rds Management Anchorage SOHIO ALASKA PETROLEUM COMPANY Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 3111 "C" STREET, ANCHORAGE, ALASKA .~ TELEPHONE (907) 561-5111 ~.~ MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 Attn: Mr. C. V. Chatterton Gentlemen: WELL X-2 (23-05-10-14) PBU Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This subsequent report completes the workover of this.well. Very truly yours, RHR:IBG:ckg 111584 Enclosures cc: Well File 917 RECEIVED Alaska 0il & Gas ~,~, ' ....... ~ ..... ~"~ '~ ~" STATE OF ALASKA ALASKA L AND GAS CONSERVATION CO~i'iMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER IX) 2. Name of Operator Sohio Alaska Petroleum ~y 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of Well At surface: 296' SI~, 383' ~'L, Sec. 08, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) __~BE = 74.10' AMSL 12. I 6 . Lease Designation and Serial No. ADL 28313 7. Permit No. 79-69 8. APl Number 5o- 029-2039? 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-2 (23-05-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] . Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing ~] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following work was performed during the workover of Well X-2. 1. Killed well. Installed BPV. Moved in rig. 2. Conditioned hole ~to 8.8 ppg NaC1. Set 2-way check valve. Removed tree. Installed and tested ..BOPE to 5000 psig. Pulled 2-way check valve. 3. Pulled 7" tubing. Recovered 9 5/8" production packer and tailpipe. Cleaned out to 10397 ' PBTD. 4. RIH and set RTTS. Tested 7" liner lap and 9 5/8" casing to 2500 psig. Run & set 7" WD packer at 9929" tailpipe at 9942' .. 5. Ran 5 1/2" 17~ AB mod. Buttress tubing string with 9 gas lift mandrels, packer at 8868 ' SSSV @ 2096 ~. Installed 2-way check. 6. N.D. BOPE. Installed and tested tree to 5000 psig. Set packer. Changed 5 1/2" x 9 5/8" annulus over to 9.6 ppg NaC1. Displaced tubing to diesel. Ran and tested ball valve. Set BPV. Moved rig off. This work was completed November 13, 1984. R E C e~ he ~ om ~s true and correct to the best of my knowledge. 14.1 her rti~yt~;gis,r~aTcorr Dis~ict Drilling Engin~ Signed ~ ~~ ~I ~. Title ~Date The space below for Commission use ~.. ~. ~e~ /~ ~" Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 May 17, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL X-2 (23-05-10-14) PBU Enclosed, in triplicate, is Form 10-403, Reports on Wells, for the above-named well. of intention to change tubing in the well. Sundry Notices and This gives notice Very truly yours, R. H. Reiley District Drilling Engineer RHR:MCM:ckg 51584 Enclosures cc: Well File 917 RECEIVED MAY 1 81984 Alaska Oil & Gas Cons. Commission Anchorage SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 4. Location of Well 99502 At surface: 296' SNL, 383' EWL, Sec. 08, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 74.10' AMSL 6. Lease Designation and Serial No. ADL 28313 7. Permit No. 79-69 8. APl Number 50- (329-2(3397 9, Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-2 (23-05-10--14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] - Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment I-~ Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing ~ Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Well X-2 is currently completed with 7" tubing. The well will be w~rked over to change out the tubing and to isolate the bottom perforated interval (9944' - 9965'). 1. Kill well. Install back-pressure valve in tubing hanger. ~ 2. Move in rig. N.D. Tree. Install and test BOPE. Pull BPV. 3. Condition hole to 8.9 ppg. NaC1. Pull 7" tubing. B~cover 9 5/8" production packer/ tailpipe. 4. RIH with 6" bit, 7" csg. scraper, and 9 5/8" csg. scraper. Clean out to PBTD. 5. RIH with 9 5/8" R~TS. Test 9 5/8" csg. to 2500 psig. 6. RIH on wireline and set 7" packer with tailpipe at 9935'. 7. RIH with 5 1/2" tbg. completion consisting of new 9 5/8" production packer, 5 1/2" sliding sleeve, and 5 1/2" GLM"s. Set packer. 8. Change 5 1/2" x 9 5/8" annulus over to 9.6 ppg. NaCl and tubing to diesel through the sliding sleeve. 9. Install BPV in tbg. hanger. N.D. BOPE. Install and test tree. Secure well. F~Dve rig off. This ~xDrk. is tentatively scheduled for early June. 1984. R E C E IV E D MAY 1 8 Lgl 14. I hereby certify that the foregoing is true and corr. ect to th.e best of my knowledge. Anchorage Signed ~ ~~ ~ ~'~ /~'~,, D'~ S~'~rict Drillinq' E~nqirleer The space below for Commission use R. T4. P,~-~.] ey Conditions of Approval, if any: .Approved Copy ~eturned 6R. IGINAL $1GliE9 BY LONfllE C. SIIlTll BV Order of Approved by. COMMISSIONER the Commission Date_~_ '/ (~" "(t_?_ .... Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUC~ 6-612 ANCHORAGE, ALASKA 99502 zo: SFO/UNIT/STATE: (-Mara tho n) GETTY Date: ]2-2~82 MOBIL Trans.#: 2899 · PHILLIPS CC#: 55899 BPAE (Transmittal Only) CENTRAL FILES(CC~'s-Transmittal Only), .' 'REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted hereWith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/ARCO ONLY: Y-2 GO CCL/Perf. S- 7 '~ c-h----'~B~VIy'------ D-21 Sch __C~~-- '~ CBL i~-28 Sch CBL/VD __ __ #1 10~16-,82 9300~10876- Ii ~.~2 -- ]0300~11762 #1 ll~4-82~-'~"9vcSQr~Q654 #1 10-24~82 11292-J~]'30 5" 5,.t., 5" SFO/UN IT / STATE: ~2) E¥16~ Dres E-16 ,,'" Dres E-20~ Go H-12~ Camco X-2 Go X-t4~/ Go / . A-91 Go D-10 Go RECEIVED DATE C/O ~/1 10-7-82 8650~9300 5" Fluid Density ~/1 10-6-82 8600~9300 5" Cont. Flow Survey ~/1 10-12-82 9700-,10172 5'! Temp. Survey #1 11-,9~82 10650-,,11200 5'! Differ. Temp. #1-4 10~11-,82 9.800~10300 5" Differ. Temp. #1-6 10-i0~.82 11400~11800 5" Differ. Temp. #1 10-19-82 9300~9930 5" Differ. Temp.. f/l-4 10-9-82 10800~11180 5" · n~.. Mestas ~/ / t"~!¥-,.('~ I~ !'~I~Z Development Geology " " Well Records Alaska Oil & Gas Cons. Commission ............. ---~,ct~orage OHIO SOHIO ALASKA PETROLEUM COMPANY SOH I 0 COl'IF I DE tT I AL ARCO To: EXXON PHILLIPS 3111 "C" S'[REET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99 502 Date: 7/27/81 =a 944 SFO REFERENCE: SOHIO MAGNETIC LIS TAPES The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/AEP/ST: J-11 Corrected NLL Printout for NLL of 4/ X-8. " " " " " of 4/ G-9 Magnetic LIS Tape & Printout 6/ X-12 " " " '" 7/ ¢ Arcn/Ph~ ]_J ips/State: (Hodges/Lehmann TDT Av 18/81 (Dres) 16/81 (Dres) 26/81 (Dres)(0H suite) 15/81 (Dres) (NLL) erages) A-8 Magnetic LIS Tape & Printout 7/2/81 #2 #61766 (Sch) A-8 ~Magnetic Answer Tape & Printout " " #61766 (Sch) H-2 Magnetic LIS Tape & Printout 4/24/81 #3 #61777 (Sch) H-2 ~fMagnetic Answer Tape & Printout " " #61777 (Sch) N-1 Magnetic LIS Tape & Printout 4/23/81 #3 #61765 (Sch) N-1 .~{agnetic Answer Tape & Printout " " #61765 (Sch) N-il Magnetic LIS Tape & Printout 5/9/81 #1 ~#61776 ($ch) N-il ~-Magnetic Answer Tape & Printout " " CQ#61776 (Sch) X-2 ~%~Magnetic Answer Tape & Printout 4/21/80 #1 #61760 (Sch) X-10 Magnetic LIS Tape & Printout 3/8/81 #1 #62005 (Sch) X-10 .~Magnetic Answer Tapc& Printout " " ~62005 (Sch) SFO & Exxon: * an asheric next %o a listing above means you should have received the Tape directly from Ventura Schl~nberge: If not, please let me know so I can correct hhe problem. RECEIVED DATE Carol Krieter Development Geology Well Records HQ 4-5 .. SOHIO ALASKA PETROLEUM COMPANY TO:' SFO/UNIT/ST Mo~ .......... 3111 '°C" STREET ANCHORAGE, ALASKA TELEPHONE {907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 4/24/81 # '755 ;FO/UNIT/ST: '-Marathon) REFERENCE: The following material is being' ~.;ubmitted herewith, Please acknowledge receipt by signing a copy of this letter and returning it to this office/-- C-16 DDNLL/5 Pass Overlay 1/6/81 #1 5" C-16 DDNLL(1 pass) 1/6/81 #1 5" J-11 Spinner 3/31/81 #2 5" J-12 Spinner 3/27/81 #1 5" F-5 TDT-M 12/9/80 #2 5" X-2 TDT-M 4/4/81 #2 5" DATE Ala.s~)~-&'~ Cons. "---'--' ,9 Anchorage Carol Krieter Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY November 20, 1980 3111 "C" STREE -c" =' .... ANCHORAGE, ALA MAIL: POUCH 6-6t~--~ ~-~.~;:~ '~' ANCHORAGE ALASK -- .~ ~-- ' ~--'1~' ~ CONFID~~ STAT TEC ISTAT TEC '-~ONFER: FILF: Alaska Oil & Gas Conservation Ccm~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well X-2 (23-05-10-14) Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to set a bridge plug to stop water production from the lowest set of perforations. GJP:ja Enclosures cc: Well File A. E. Leske S. R. Bundy Geology Y~rs very truly, ~ .... District Field Engineer RECEIVED NOV 2: ~'~ ° 19o0 Alaska. Oil & Gas Cons. Commission Anchorage STATE Of ALASKA ALASKA C~'. AND GAS CONSERVATION CO(' 41SSlOU SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 79-69 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20397 4. Location of Well 9. Unit or Lease Name Prudhoe Bay Unit At surface: 296' SNL, 383' E~L, Sec. 8, T10N, Ri4E, UF~.I 5. Elevation in feet (indicate KB, DF, etc.) I<BE = 74.10 ' AMSL 6. Lease Designation and Serial No. ADL 28313 10. Well Number X-2 (23-05-i0-14) 11. Field and Pool Pr udhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) i~erforate [] Alter Casing I--} . Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] RePairs Made [] Other [] Pull Tubing [] OtherStO]~ w~ter [] Pulling Tubing [] proo. UC~lOn (Note: Report multiple completions on Form 1'0-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A bridge plug will be set at the following interval during December, 1980/January, 1981: 9926 ' - 9937 ' Bt~ (Ref. BHCS/GR, 11/21/79) This plug will shut off the water production by blocking off the lowest set of perforations from further production. The lowest set of perforations is the sole source of the present 38% water cut. ECE ¥ED 14. I hereby-""~~'~ , t F __ ce tiC%at the foregoin~is true and correct to the best of my knowledge.. signed /,/ '~~~~.: Title District Field Engineer .... The sp~ce'~elowvfOr (~,~ission use (~ ,7. Pi isga Condi~u~s of Approval, if any: Approved by ~ ~ ' . ~; COMMISSIONER Form 10-403 Rev. 7-1-80 Alaska 0il & Gas Cons. CornmissJor~ Anchorage Date Approved Copy urned By Order of the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company 3111 '°C" STREET ANCHORAGE, ALASKA T~LJ~PHON E (907) 265-0000 SOHIO-BP ALASKA PRODUCTION DIVISION MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: .AAC0 EXXON 10/14/80 PHILLIPS REFERENCE: //~HIO MAGNETIC TAPES /efoHowi.§ materia~ is beim§ acknowledge receipt by si§mimg submitted herewith. P~ease copy of this ~etter amd retumimg it to this office:- M-7 LIS Tape ~/1 4/17/80 ~/60440 ~j~IS Tape f/1 4/21/80 f/60436 Well Records RECEIVED - . J SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: SFO/UNIT/STATE (-Marathon) REFERENCE: Mobil , Philhps ..... BF3.~ ~ SFO -. , -",- TELEPHONE (907] · . MAI.L: POUCH ANCHORAGE, ALA 3111 "C" STF~EET, ANCHORAGE, AI~A~KA 265-0600" 3 ~-612'.i .- '; ;K. ~ 99502~ ..... ._ ! t ! STAT 9/26/80 i?fB 7. ,i, 'i_: _~__- CONFER: FILF: ....... -~_~. SOHIO' FINAL CASED HOLE DATA ~~The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- C-7 Spinner 8/11/80 #1 D-5 Flowmeter 7/15/80 #1 D-8 Spinner ' 8/13/80 #1 D-9 TDT-M 7/18/80 #1 GC-3D Collar Log 8/7/80 #1 M-1 Spinner 8/18/80 #1 M-2 EPL 8/17/80 #1 ~ EPL 8/21/80 #1 X-9 EPL 7/27/80 #1 X-9 EPL 7/31/80 ' #2 Y-6 CCL 8/1/80 #1 5~! 5" 5" 5" 5" 5" 1"/2"/5" 2"/5" 5" 5" Well Records SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: S~O/~]:T/STATE ~~ ~ 9/11/80 #35O REFERENCE: /UNIT / STATE -¥mrathon) S OHI. O DATA T~,;' following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and return_lng it to this office:-- -. B-17 Bottom Hole Pressure Data Form & Survey II II II II II II (Dresser) 8/25-26/80 (Schlum.) 8/25/80 (Schlum.) 8/21/80 (Schlum.) 8/10/80 Carol Kr~ete¥ / i Well Records RECEIVED DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION - J ....STAT TEC - ~ "~--""'~'--'-'--'--j_~ ST~_T_TEC-- SFO/UNIT/ STATE (-Marathon) ,? 3111 "C" STREET N~:HORAGE, ALASKA _E~HONE {907) 265-0000 MAIL: POUCH 6-612 HORAGE, ALASKA 99502 ~ ! FILF: -----_._ 5/14/80 #147 REFERENC .. " "/""SOHIO FINAL' CASED HOLE DATA / The following material is being submitted herewith. Please acknowledge receipt by signing a ! V copy of this letter and returning it to this office:- C-ll TDT-M M-7 TDT-M X-1 TDT-M TDT-M - TDT-M 4/18/80 #1 5" 4/17/80 #1 5" 4/20/80 #1 5" 4/21/80 #1 5" 4/19/80 #1 5" Carol Krieter Well Records SOHIO ALASKA PETROLEUM COMPANY April 14, 1980 Alaska Oil & Gas Conservation Con~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: Well X-2 (23-05-10-14) Enclosed, in dUplicate, is Form P-7, Completion Report, for the above-named well together with the Well History. This well has been perforated and is now on production. AMR: ja Enclosures cc: Well File #17 C~ology Yours very ~ly, A. M. Reid Acting District Drilling Engineer RECEIVED Form P--7 SUBMIT INDUP ~,,~TE* STATE OF ALASKA (see other in- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: OwliELLL[-~ GAS r--I WELLL_J DRYD Other b. TYPE OF COMPLETION: NEW ~ WORK DEEP-I--'-I PLUG r-"l DIFF. I--"1 WELLI2~I OVER [~] EN I I BACK.I I RESER.II Other 2. NAME OF OPERATOR Sohio Alaska Petroleum Company 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, Alaska 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* 5. APl NUMERICAL CODE 50-02~--20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. ×-2 (23-05-10-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool Atsurface 296' SNL, 383' EWL, Sec. 8, T10N, R14E, UPM · . At top prod. interval reported below : ' 2513' NST., 2320' ~W-~, Sec. 5, T10N, ~4~,, U~M At total depth 2659' NSL, 2458' EWL, Sec. 5, T10N, R14E, UPM 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 79-69 18. TOTAL DEPTH, MD&TVD 119. PLUG BACK MD&TVDI20.1FHowMANy.MULTIPLECOMPL., 121. ROTARY TOOLS INTERVALS DRILLEDBY CABLE TOOLS Z0460'~D 944Z'~ I ~8§~'~) 9382'TVDI I Total 22. PRODUCING INTERVAL(S), OF THIS COMPLETION -TOP, BOTTOM, NAME (MD & TVD)* 23. WAS DIRECTIONAL Prudhoe O±1 PooZ Top: 9891" MD 8909' TVD SURVEYMADE Bottom: 9965' MD 8977" TVD Yes 24. TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR, FDC/CNL/GR/Cal, HDT, Cyberlook 25. CASING RECORD (Report all strings set in well) c~s,.~ s,z~ I w~,~.~. ~,,,.~. / ~"*~ / ~"~" s~,~o, I .o~ s,z~ 20"x30" JIns~at~ c~uct~r 110'~ 36." 13 3/8" ~ 729 ~80~ 2689' 17~" 9,,5/s,, I 47~ i~s0/ 95~4, 12~'" 7 I 29~ j ~8019009-10452, 8~'" 26. LINER RECORD J27. J CEMENTING RECORD J AMOUNT PULLED 10.6 cu.yds. Arcticset co~crete 14641 cu. ft. Permafrost IiI 11333 cu. ft,Class G;i$0cuIft, Permafrost I 314 cu. ft. Class G TUBING RECORD III SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* 28. PERFORATIONS OPEN TO PRODUCT[ON (interval, size and number) 9891-9901'BKB 0 '" · 5 ~.@4spf (Ref. BHCS/GR, 11/21/7 ~ 9911-9926'" " " ( '" ) j 9944-9965'" " " ( " ) SCREEN (MD) I SIZE DEPTH SET (MD) PACKER SET (MD) I 7" 9064 ' 8964' 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. ))DEPTH INTERVAL (MD) I AMOUNT AND KIND OF MATERIAL USED 30. PRODUCTION DATE~F~"~"~)U~C~TION JPRODUCTION METHOD (Flowing, gas lift, ~umplng--slze and type of pump) JWELL STATUS (Producing or (. 3/18/80'~ J Flowing J s. ut-,n, Producing DATE"O'~¥. IHOURS TESTED CHOKE SIZE J PROD'N FOR OIL--BBL. I I ~ I 31. DISPOSITION OF GAS (Sold, used for fuel vented, etc.) j~ .~ / 32. LIST OF ATTACHMENTS We~ Histo~ 33. I hereby certify that the foregoing and attached information is complete and correct as determined from all avallabl~ racords. Actin$ *(See instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22.' If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement": Attached supplemental records for this wel. I should show the details of any multiple stage cementing and the location of the cementing tool. Item 28' Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ,, 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME ,., MEAS. DEPTH TRUE VER,T, DEPTI BKB Subsea Sag R. SST. 9651' 8617.' Shublik 9678 ' 8641 ' Ivishak 9762 ' 8717 ' 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, PORosITy, FRACT~JRES, APPARENT DIPs AND DETECTED SHOWS OF OIL, GAS OR WATER. · DRILLING November, 1979 '~m~.T. X-2 (.23-05-10-14) w~r,~, HISTORY Spud well 1700 hours, 11-3-79. Drilled 17 12/" hole to 2700'. Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 4641 cu. ft. Permafrost cement. Installed and tested BOPE. Tested 13 3/8" casing to 3000 psi. Drilled out to 2725 ", ran leak-off test. Directionally drilled 12 1/4" hole to 9457'. Attempted to log, could not. Drilled~i. to 9499'. Ran open hole logs. Drilled to 9525'. Ran 247 jts. 9 5/8" 47# L-80 Buttress casing to 9514'. Cemented in t~o stages: First stage with 1333 cu, ft. Class G cement; second stage through D.V. Packer at 2604' with 130 cu, ft.. Permafrost cement preceded by Arctic Pack, cleaned out to 9508', tested caSing to 3000 psi. Drilled out to 9555', ran leak-off test. Directionally drilled 8 1/2" hole to 10460' with scme lost circulation. Ran open hole logs~ Ran 36 jts. 7" 29# L-80 Buttress casing to 10452 '. Cemented wi, th 314 cu. ft. Class G cement. Cleaned out to 10397'. Tested casing to 3000 psi. Ran CBL. Displaced well to NaC1. Ran 215 jts. 7" 26# L-80 AB-.TC-4S tubing to 9064 '. Landed tubing with ball valve nipple at 1992'. Displaced tubing to diesel. Set packer at 8964', tested tubing to 3500 psi. Released rig at 0930 hours, 11-26-79. PERFORATING March, 1980 Pressure tested tubing and inner annulus. Rigged up Schlumberger and perforated the following intervals using 2 7/8" guns at 4 spf: 9891' - 9901' BKB (Ref. BHCS/GR, 11/21/79) 9911' - 9926' BKB (Ref. BHCS/GR, 11/21/79) 9944' - 9965' BKB (Ref. BHCS/GR, 11/21/79) Pu~ well on production. April, 1980 Shut in well in preparation for static pressure survey. Ran static pressure/tempe_ rature survey at 8800' TVDss. Set and tested insert sleeve and SSSV in ball valve nipple at 1992'. Well on production. E~: ja SOHIO ALASKA PETROLEUM COMPANY April 9, 1980 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 _. i 3111 "C" S "~$' EN° - MAIL: POU( ~ ~~~ ANCHORAGE, ~ Attn: Mr. H. Hamilton Re: Wells X-2 (23-05-10-14) and X-3 (31-05-10-14) Gentlemen: Enclosed please find, in.duplicate, Frcm 10-403, Sundry Notices and Reports on Wells, and Form 10-404, MonthlyReport of Drilling and WorkoverOperations for the above-referencedwells. Very. truly yours, SOHIO ALASKA PETROLEUM CQMP~ . iS.~ 'ic 'Fie Engineer Enclosures CC: S. R. Bundy A. E. Leske Drilling File Forn~ 10-403 REV. 1'-103'3 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals) ~" OlL~ GAs r"l WELI~ WELL OTHER 2. NAME OF OPERATOR Sohio Alaska Petroleum Cc~pany 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At su trace 296' SNL, 383' EWL, Sec. 8, T10N, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 74.10' AMSL 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9.' WELL NO. X-2 (23-05-10-14 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 79-69 3ort, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PI-~NS (Other) SUBSEQUENT REPORT OF= WATER SHUT-OFF FRACTURE TREATMENT SNOOTING OR ACIDIZING (Other) REPAIRING WELL ALTERING CASING ABANDONMENT* (NOTEt Report results of multiple completion on Well Completion or Recompietion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state ell pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. The following intervals were perforated during March/April, 1980, using Schlumberger 2 7/8" guns @ 4 s.p.f.: 9891-9901 ft. BKB (Ref. BHCS/GR 11/21/79) 9911-9926 ft. BKB (" " ") 9944-9965 ft. BKB (" " ") A SSSVwas set and tested in the ball valve nipple ca. 2000'. RECEIVED SIGNED -,,"~11~r itt' o t~/' ~.~ll~-~J~-.d~f.,. TITLE, D~T~'~C. T FIELD ENG~R G. J. PT,IS~qA ~// (This space for State office u~) ~ DATE APPROVED BY , CONDITIONS OF APPROVAL, IF ANY: TITLE DATE JH :mlh See Instructions On Reverse Side Form No. 10-404 REV.'3-1-'70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1o OIL WELL SUBMIT IN DUPLICATE (' 5. APl NUMERICAL CODE 50-02q-20qq7 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF IND[AN'ALOTTEE OR TRIBE NAME GAS ~] WELL OTHER 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Sohio Alaska Petrole~n Ccmpany Prudhoe Bay Unit West 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 SNL 383' EWL, Sec. 8, T10N, R14E, UPM 4. LOCATION OF WELL At surface: 296' 9. WELL NO. X-2 (23-05-10-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, ~ 12. PERMIT NO. 79-69 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. March 17, 1980: March 18, 1980: April4, 1980: April 6, 1980: April 6, 1980: Pressure tested tubing and inner annulus. Rigged up Schlumberger and perforated the following intervals using 2 7/8" guns @ 4 s.p.f.: 9891-9901 ft. BKB (Ref. BHCS/GR, 11/21/79) 9911-9926 ft. BKB (" " ") 9944-9965 ft. BKB (" " ") Put well on production. Shut in well in preparation for static pressure survey. Ran static pressure/tamperature survey at 8800 ft. TVDss. Set and tested insert sleeve and SSSV in ball valve nipple ca. 1992'. Well on production. 14. I hereby certi d corr/9~ _ SIGNED _~_./C,,O'L~_ EI~.~__~)~S~'~.- TITLED]?~qtPR]~(2T ~ ~~ DATE / / NOTE--Report on this' form is required f~each'' calendar month, regardle, of the status of operations, and must be filed in duplicate with the oil and gas conservation commi~ by the 15th of the succeeding month,unl~ otherwise dir~t~. ~:mlh SOHIO ALASKA PETROLEUM COMPANY ~V~rch 10, 1980 State of Alaska Department of Natural Resources Division of Oil & Gas Conservation 3001 Porcupine Drive Anchorage, Alaska 99509 A~CHOR~XCE, ALAS~,:A'"~'~__, i ,-", ?' "' __~ STAT T'. -CONFER[' FILF~" ' Attn: ~r. H. Hamilton C-12 (34-20-11-14); D-9 (11-25-11-13); X-2 (23-05-10-14); and X-3 (31-05-10-14) Gentlemen: Enclosed please find, in triplicate, Fora 10-403, Sundry Notices and Reports on Wells, for each of the above-referenced wells. Very truly yours, SOHIO ALASKA PETROLEUM COMPANY District Field Engineer G3P: SB: mlh Enclosures CC: S. Bundy A. E. Leske Well File F~rm ~10-~b3 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 1. O,L ~ GAS [--1 WELL4~J WELL OTHER 2. NAME OF OPERATOR Sohio Alaska Petroleum Company 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF WELL At surface 296' SNL, 383' EWL, Sec. 8, T10N, R14E, UPM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) KBE = 74.10' AMSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 15. APl NUMERICAL CODE 50-029-20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit West 9. WELL NO. ×-2 (23-05-10-14) 10. FIELD AND POOL, OR WILDCAT PrudhDe Bay, Prudhoe Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 79-69 )orr, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTER lNG CAS lNG SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTEt Report results of multiple completion on Well Coml~letion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state ell I~ertlnent details, and give pertinent dates, including estimated date of starting any proposed work. The following intervals will be perforated during March/April, 1980, using Schlumberger 2 7/8" guns @ 4 s.p.f.: 9891-9901 ft. BKB (Ref. BHCS/GR 11/21/79) 9911-9926 ft. BKB (" " ") 9944-9965 ft. BKB (" " ") A SSSVwill be set and tested in the ball valve nipple ca. 2000'. JH:mlh ~ 16. ' hereby cer[lf~ that t h~.~t~~t rue and correct D~~ ~GI~ (This '~.C' for State ~~) ~~j . CONDITIONS OF~ROVAL, IF A~Y= See Instructions On Reverse Side DATE. DATE Approve~ Returned SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: STATE OF ALASKA .. Alaska OII & Gas Con~~o~ Comm/~/olt 3001 Porcupine Drive Anchorage, Alaska 99501 Att:~. M-. H. Hamilton ARCO/EXXON/SFO PHILLIPS/STATE 2/11/80 #013 REFERENCE: SOHIO DATA ~.,..,/~e__ following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- F-9 Magnetic Tape & Listing 12/2/79 G-4 " " " 4/28/79 " " " 9/27/79 " " " 11/21/79 Carol KYi~t'er , Well Records #60040 #57035 #57070 #60050 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO-BP ALASKA PRODUCTION DIVISION TO: STATE OF ALASKA ~' .... k~ O[I & Gas Conservetlon ~ - ~o:cupine Drive A~;ch, age, Alaska 99501 Attr~. Mr. H. Hamilton REFERENCE: SOHIO WELL DATA / he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it ~o this office:-- '/SFO/UNIT minus: Marathon !*-5 D-9 C-9' B-13 FINAL CASED HOLE LOGS: ,Temp. Log 12/21/79 #1 5" Temp. Log 12/7/79~. #1 5" Spinner 12/22/7'9 5" Spinner 12/20/79 #1 5" Temp. Log 12/19/79 ~1 5" Spinner 12/13/79 #1 5" Spinner 12/9/79 ~1 5" ~ECE~V DATE 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: STATE O.F ALASKA Alaska 011 & 3001 Porcupine Drive Anchorage, Attn: Mr. H. TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA .99502 12/19/79 SFO/UNIT/STATE REFERENCE: SOHIO WELL DATA ollowing material i's being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- A-2 B-6 B-7 B-14 Hewlett Packard Pressure Data 11/28/79 Bottom-Hole Pressure Data Form " Bottom-Hole Pressure Data FOrm 11/24/79 Otis Reservoir Pressure & Temperature Data 11/24/79 Bottom-Hole Pressure Data Form 11/26/79 Otis Reservoir PresSure & TemperatureData 11/24/79 Bottom-Hole Pressure Data Form 11/28/79 Hewlett Packard Pressure Data 11/28/79 Bottom-Hole Pressure Data Form 11/11/79 Hewlett Packard Pressure Data 11/11/79 Sundry Notice/Report on Wells & Monthly Report Drilling Sundry Notice/Report on Wells & Monthly Report Drilling Well Completion/Recompletion Report & Well History Carol Krieter Well Records 19 SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION TO: ~'("'A'F~, OF ALASKA ~:i':'::~:'k,3 0~! I Gas Con~ervalion c~,~.,~ Porcupine' Drive Att :: ~.:~*. H. Hamilton 1 ENG <' ? GEOL ! 3111 "C" STREET ~ ANCHORAGE, ALASKA /'STAT T!:::C~ TELEPHONE (907) 265-0000 / C'T/ ...... oi *'.; ~ "~/'i MAIL: POUCH 6-612 I ANCHORAGE, ALASKA99502 ~ 12/~/79 REFERENCE: SOHIO OPEN HOLE FINAL LOGS ~ ~~coh;yf~hlo~iisnlge2ett;~i;Ir~Sturber~inngg ,i~ tb~i~itohff;;:TiJh. Please acknowledge receipt by signing a X-2 BHCS 11/21/.79 BHCS 11/21/79 Cont. Dipmeter 11/14/79 FDC FDC FDC/CNL FDC/CNL DIL DIL CPL CPL #2 5" #2 2" #1 5" 11/21/79 #2 5" 11/21/79 ,~ #2 2" 11/21/79 #2 2" 11/21/79 92 5" 11/13&21/79 #l&2 2" 11/13&21/79 #1&2 5" 11/21/79 #2 5" 11/14/79 ~1 2" ( Carol Krieter · ~. Well Records DATE f , . . 19 SOHIO PETROLEUM COMPANY Division of Sohi~ Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION December 17, 1979 ~-~.A~V~ ~ -3111 "C" STREET ~55 ENO · ANCHORAGE, ALASKA ,~__~-i~L~:-TE LEPHONE (907) 265-0000 ~~:i.!~_ ..... MAIL: POUCH 6-612 4 EN®--~ CHORAGE, ALASKA 99502 STAT T~C , ? Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: WellX-2 (23-05-10-14) Enclosed, in duplicate,' is Form P-7, Completion Report, for the above-namedwell together wi'th the Well History', Well Logs, and Directional Survey. This well has been suspended pending perforating operations. Yours very` truly, SOHIO PETRO~ COMPANY District Drilling Engineer PRJ: ja Enclosures cc: ~11 File #17 Geology Form ~ SUBMIT IN DUP;~. r-LE* STATE OF ALASKA (see other In- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMIPLETION OR RECOIViPLETION REPORT AND LOG* o,.,..: WELLE] DRYE] Other b. TYPE OF COMPLETION: NEW WORK I---I DEEP- PLUG r-] DIFF. WELL~[ OVER I I EN J--]BACK.I I RESER.II Other 2. NAME OF OPERATOR Sohio Petroleum Ccmpany, a Div. of Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK. 99502 4. LOCATION OF WELL (Report location clearly and in accordance with any State requjre_ments)* Atsurface 296' SNL, 383' EWL, Sec. 8, T10N, R14E, UPM At top prod. interva~ reported below Top Sag. R. SST. 2441' NSL, 2250' ~L, Sec. 5, T10N, R14E, UPM At total depth 2659' NSL, 2458' EWL, Sec. 5, T10N, R14E, UPM 5. APl NUMERICAL CODE 50?,029-20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit NOo ~6 AND POOL, OR WILGCAT Prudhoe Bay, Prudhoe Oil Po( 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 79-69 11/3/79 I 11/19/79 11/26/79 KBE =q3jlO ft. AMSL 39.51 ft. AMSL 10460 'MD 9441"TVD '"vDEPTH HOW MANY* 21. ROTARY TOOLS INTERVALS DRILLED BY CABLE TOOLS I 'I0397'MD 9382'TVDI Total 22. PRODUCING INTERVAL(S), OF THIS COMPLETION -TOP, BOTTOM, NAME (MD & TVD)* 23. WAS DIRECTIONAL I SURVEY MADE None I TM 24. TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/GR, BHCS/GR, FDC/CNL/G~Cal, [~)~. C~berl~k 25. CASING RECORD (Report all strings set In well) CASING SIZE 20" x 30" 13 3/8" 9 5/8" 7" 26. SIZE WEIGHT, LB/FT. / GRADE / DEPTH SET (MD) Insulated ¢onduc~r 110 ' 72~ /L-80 / 26:89" / -80 /- 9514,' 29~f IL--80 9~)09 '~-10452' LINER RECORD TOP (MD) BOTTOM (MD) SACKS CEMENT* 28. PERFORATIONS OPEN TO PRODUCTION None (Interval, size and number) HOLE SIZE I CEMENTING RECORD / AMOUNT PULLED 36" 110.6 cu,yds. Arcticset Co~crete 17%" 14641 cu. ft. permafrost II.i] 12¼" 11333 cu. ft'Class G;130 cuI ft'. Pera%afrost ½,' f ~ 8~' 1314 cu. t. Class G ' 27. SCREEN (MD) SIZE · TUBING RECORD DEPTH SET (MD) 9064' 7I! 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED PACKER SET (MD) 8964" 30. PRODUCTION DATE FIRST PRODUCTION PRODUCTION METHOD (Flowing, gas lift, Dumping--size and type of pump) DATE OF TEST' IHOURS TESTED ]CHOKE SIZE I PROD'N FOR OIL--BBL'TEST PERIO~D,~ I 31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.) shut-in) L .., WAT . I I L RATIO I I ~/O,L GRAV,TY-^P, (CORR.) iWAT~'0iJ & ?,~S I 32. LIST OF ATTACHMENTS Well History., We_ll Loq~, Directional Surveys ~/- SIGNED TiTLE District Drillinq Engineer P,'R. J~Qd~ " *(See instructions and Spaces for Additional Data on Reverse Side) .,. INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown.) for depth measurements given in other spaces on this form and in any attachmentsl Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS. NAME · · ME~,S.' D E'PTH TRUE VERT.,DEPT Sag R. SST. 9651~' 8617' Shublik 9678' · 8641' · Ivishak 9762 ' 87177 36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES~ APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. · , , Item 26: "Sacks Cement": Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). WELL X-2 (23~05-10-14) W~.T. HISTORY November, 1979 Spud well 1700 hours, 11-3-79. Drilled 17 12/" hole to 2700'. Ran 68 jts. 13 3/8:' 72~ L-80 Buttress casing to 2689'. Cemented with 4641 cu. ft. Permafrost cemm~t. Installed and tested BOPE. Tested 13 3/8" casing to 3000 psi. Drilled out to 2725', ran leak-off test. Directionally drilled 12 1/4" hole to 9457'. Attempted to log, could not. Drilled to 9499'. Ran open hole logs. Drilled to 9525'. Ran 247 jts. 9 5/8" 47% L-80 Buttress casing to 9514.'. Cemented in t~o stages: First stage with 1333 cu.ft. Class G cement; second stage, through D.V. Packer 'at 2604' with 130 cu,ft. Permafrost c~t preceded by Arctic Pack, cleaned out to 9508', tested casing to 3000 psi. Drilled out to 9555', ran leak-off test. Directionally drilled 8 1/2" hole to 10460' with scme lost circulation. Ran open hole logs. Ran 36 jts. 7" 29% L-80 Buttress casing to 10452'. Cemented wi. th 314 cu.ft. Class G cement. Cleaned out to 10397'. Tested casing to 3000 psi. Ran CBL. Displaced well to NaCl. Ran 215 jts. 7" 26# L-80 AB-.TC-4S tubing to 9064'. Landed tubing with ball valve nipple at 1992'. Displaced tubing to diesel. Set packer at 8964', tested tubing to 3500 psi. Released rig at 0930 hours, 11-26-79. RECEIVFD SOHIO PETROLEUM COMPANY Division of Sohi~ Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION December 7, 1979 i---r-~'-F_r,,t~-"-/l~! · ~1,, "c" ~-- j ~' CE~~ MAIL: POUCH 6-612 J STAT TEC CO~ID~~ ~ CONFER: FI[F: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. H. H. Hamilton Gentlemen: 'Well X'2' (.123'05'10'14 Enclosed, in duplicate, is Form10-404, MonthlY Raport of Drilling and WorkoverOperatiOns, for'the'above-' named well for the month of November, 1979. PR J: ja Enclosures cc: Well File #17 Yours very truly, SOHIO PETROLEUM COMPANY P. R. Judd District Drilling Engineer Form No. 10404 REV. 3-1-70 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. APl NUMERICAL CODE 50-029-20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 WELL WELL OTHER 2. NAME OF OPERATOR Sohio Petroleum Co., a Div. of Sohio Natural Resources Co. 3. ADDRESS OF OPERATOR Pouch 6-612~ Anchoraqe, A/~ 99502 4. LOCATION OF WELL 296' SNL, 383' ~qL, Sec. 8, T10N, R14E, UPM At Surface: 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. X-2 (23-05-10-14) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, Prudhoe Oil Pool 11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE) Sec. 5, T10N, R14E, UPM 12. PERMIT NO. 79-69 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS. November, 1979 Spud well 1700 hours, 11-3-79. Drilled 17 1/2" hole to 2700'. Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2689'. Cemented with 4641 cu. ft. Permafrost cement. Installed and tested hOPE. Tested 13 3/8" casing to 3000 psi. Drilled out to 2725', ran leak-off test. Directionally drilled 12 1/4" hole to 9457'. Attempted to log, could not. Drilled to 9499'. Ran open hole logs. Drilled to 9525'. Ran 247 jts. 9 5/8"' 47.~ L-80 Buttress casing to 9514'. Cemo~ted in two stages: First stage with 1333 cu.ft. Class G cement; second stage through D.V. Packer at 2604' with 130 cu.ft. Permafrost cement preceded by Arctic Pack, cleaned out to 950.8', tested casing to 3000 psi. Drilled out to 9555', ran leak-off test. Directionally drilled 8 1/2" hole to 10460' with some lost circulation. Ran open hole logs. Ran 36 jts. 7" 29~ L-80 Buttress casing to 10452'. Cemented with 314 cu. ft. Class G ceanent. Cleaned out to 10397". Tested casing to 3000 psi. Ran CBL. Displaced well to NaC1. ~t~ts. 7" 26~ L-80 AB-IJ-4S tubing to 9064'. Landed tubing with ball valve nipDle a~1992~ /Dis- placed tubing to diesel. Set packer at 8964', tested tubing to 3500 'psi'~ Rel~a~s~g at 0930 hours, 11-26-79. SIGNED._ ~ii~~TITLE District Drilling'Engine~t£ /2- /75 NOTE--Report on tths form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed. Alaska Oil and Gas Conservation CommiSsion Hoyle H. Hamilton ~~ Nove~r 13, 1979 Chairman of t.he Commissi~Wt' Lonnie C. S ith Commissioner Ben H. LeNorman Petroleum InSpector B.O.P.E. Test on Sohio*s X-2 Sec. 5, T10N, ~4E, UM Bay Monday, Nove~r 5 - I departed my home at 2~00 PM for a 2=30 PM showup and scheduled 3=30 PM departure via the Sohio-BP charter for Deadhorse. Bad weather at Prudhoe Bay delayed our departure until 5~00 PM and we arrived at Deadhorse at 6=35 PM. Weather~ 25CF, winds 25 MPH from the NOrth, Iow visibility. ~esday,. November 6 - Tests on well x-2 began at 9~15 AM and were completed at 10~ 35 AM with results attached. .We~nesda¥.~..Noy~r ~7.- BO.P.E. tests on ARCO's DS 6-9 corn.Dieted, the subject of a seperate re~ort. Thursday, Nov~~..~- B.O.P.E. tests on ~CO~s Kupa~uk D-1 completed, t_he subject of a separate retx>rt. I det~rted Deadhorse via Wien Flt. %10 at 1=40 Pm arriving in Anchorage at 3..20 PM and at my home at 3~50 PM. In summary, I ~tnessed successful B.O.P.E. tests on Sohio-BP's X-2. Alaska Oil and C-as Conservation Commission Field Inspection of Blowout Prevention Equipment Inspector Operator ~ation: Dril ling Con~a~or Location, General Well.Sign General Housekeeping Rest_rye pit Date //- ~ .-'7 ~ Representative ,it ~. /~ ~-Y ~' c=~ Permit # ~- ~ /~~ing Set 8 ~~ ft. AC~~R SYST~ ~~ Full Ch~ge Press~e .~~ psig Pres~e ~ter Clo~e /~O psig 200 psig ~ve Pre~arge Attain~: ~11 ~arge Pr~s~e Atta~:. ~ ConSols: Master O~ Remot~ ~/~ Blin~s ~itch co~r~o Rig BOPE Stack Annular Preventer Pipe Rams B1 ind Rams Choke Line Valves Test Pressure Upper Kelly Lower Kelly. Bal 1 Type Ires ide BOP . min 3~ sec, min / ~) sec. Kally and Floor Safety Valves Test Pressure Test Pressture _.?~',~' Test Pressure' ~ Test Pressure H.C.R. Valve Kill Line Valves Check Valve Choke Manifold No. Valves No. flanges ._~ O Adjustable Chokes Hydrauically operated choke Test Pressure ~5-~oo Test Results: Failures ~] Test Time / hrs. -~ Repair or Replacement of failed equipment to be made within days and ~Inspector/Commission office notified. Distribution orig. - AO&GCC cc - Field Operator/Supervisor ',.J/.~'J~'_ ~~..~'/-..~~ cc - Drilling Dept. Superintendent ~/~ /~.o..~'~" September 211, 1979 Re= Prudhoe Bay Unit Well No. X-2 .~ SOhio Petroleum Company Permit No. 79-69 Sur. Loc.= 296~SNL, 383~EWL, Sec 8, T10N, R14E, UPM. Bottomhole Loc.~ 2450~NSL, 2790'WE'~, Sec 5, T10N, R14E, UPM. Mr. P. R. Judd District Drilling Engineer Sohio Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Dear Mr. Judd z Enclosed is the approved application for permit to drill the above referenced well. Well samples, core chips and a mud log are not required. A directional survey is required. If available, a tape contain- ing the digitized log information on all logs shall be submitted for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70} and by the Federal Water Pollution Control Act, as amended. Prior to Mr.. P. R. Judd Prudhoe Bay Unit No. "2-- September 21, 1979 commencing' operations you may be contacted by a representative of the Department of Environmental Conservation. Pursuant to AS 38.40, LOCal Hire ~nder State Leasee, the Alaska Department of Labor is being notified of the issuance of this per~rit to drill. To aid us in scheduling field, work, we ~,ld app=ectate your notifying this office within 48 hours after the well is spudded, we would also like to be notified so that a repre- sentative of the commission may be present to witness .testing of blowout preventer equipment before surface casing shoe ks dri, lled. In ~ event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, Hoyle H. Hamil ton Chairman/C~issioner of BY ORDER OF THE Alaska Oil & Gas Conservation Co~tssion Enclosure cc~' Department of Fish & Game, Habitat Section w/o, eno1. Department of Environmental Conservation w/o/eno1. Department of Labor~ Supervisor, Labor Law Co, pi,lance DiVision w/o enul. SOHIO PETROLEUM COMPANY Division of Sohio Natural Resources Company SOHIO--BP ALASKA PRODUCTION DIVISION September 18, 1979 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAI L: POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation C~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. Hoyle H. Hamilton Gentlemen: Well X-2 (23-05-10-14) Enclosed are the following documents: 1. Application for Permit to Drill, in triplicate 2. Proposed drilling program outline 3. Our check for $100.00 to cover the permit filing fee 4. Three copies of surveyor's plat showing w~ll location. Provided there are no oil or gas shows prior to setting 13 3/8" casing on X-i, we would like to apply for an exception allowing us not to use a diverter system for the remaining X-pad wells. Very truly yours, SOHIO PETROLEUM CC~PANY P. R. Judd District Drilling Engineer PRJ:ja Enclosures cc: Well File 917 EiVFD 1979 Form 10-40! ~ ) SUBMIT IN TRIP ' (Other instructioh~ REV. 1-1-71 reverse side) la. TYPE OF WORK STATE OF ALASKA OI'L AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN DRILL ~ b. TYPE OF WELL OIL GAS SINGLE MULTIPLE WELL [] OTHER [~] WELL D ZONE [] ZONE 2. NAME OF OPERATOR Sohio Petroleum Co., Div. of Sohio Natural Resources 3. ADDRESS OF OPERATOR Pouch 6-612, Anchorage, AK 99502 4. LOCATION OF W~LL Atsurface 296' SNL, 383' EWL, Sec. 8, T10N, R14E, UPM DEEPEN API #50-029-20397 6. LEASE DESIGNATION AND SERIAL NO. ADL 28313 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. X-2 (23-05-10-14) At proposed prod. zone 2450' NSL, 2790' WEE, Sec. 5, T10N, R14E, UPM 13.' DISTANCE IN MILES AND DIRF_L'TION FROM NEAREST TOWN OR POST OFFICE* 10 miles N.W. of Deadhorse 14. BOND INFORMATION: 15. DISTANCE FROM PROPOSED * , LOCATIONTO NEAREST 2790 W. of ADL PROPERTY OR LEASE LINE, FT. 2 8 312 (Also to nearest drig, unit, if any) 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2782' N.E. of Well X-1 TY~E Blankets~etvana/orNo. American Insurance Company 3348616 16. No. OF ACRES IN LEASE 2501 19kDPROPOSED DEPTH TVD 10543' 9454' 21. ELEVATIONS (Show whether DF, RT, CR, etc.) KBE = 65' AMSL est. 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay, ~rudhoe Oil ~OO± 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 05, T10N, R14E, UPM 12. Amount $100,000.00 17. NO,ACRES ASSIGNED TO THIS WELL 160 20. ROTARY OR CABLE TOOLS Rotary. 22. APPROX. DATE WORK ~LL START October 20, 1979 23. PROPOSED CASING AND CEMENTING PROGRAM · , SIZE OF HOLE ' SIZE OF CASING ~IGHT PER FOOT GRADE ~) SE~ING DE~V~ Quantity of cement ;" 30" x 20" Insulated Conductor 110' 110'10.6 cu. yds.· Articset Concrete 1/2" 13 3/8" 72# L-80 2670' 2670'3720 cu.ft. Permafrost C 1/4" 9 5/8" 47# L-80 9499' 8575'1316 cu.ft. ClassC+130cu~ft.Perma 1/2" 7" ~9 L-80 10543' 9454'238cu,ft. ClassC+18%sa]t 36 8 !rOst£ See attached proposed drilling program. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed new productive zone. If proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and true cal depths. Give blowout preventer program. 24. lherebycertifythat~ ~/~/7~ District Drilling SIGNED ........ DATE TITLE Engineer r. lt~ J U~ ' (This space for State office use) SAMPLES AND CORE CHIPS REQUI1LED ~Y~S ~i~NO DIRECTIONAL SURVEY REQUIRED J~Y~ ~]NO I MUD LOG [] Y~ ~LNo CONDITIONS OF APPROVAL, IF ANY: OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE o'-o-o-cq-zoZ ?7 PERMIT NO. 7 f" ~ ~ APPROVAL DATE APPOVED BY TITLE Chaizm~ *See Instruction On Reverse Side BY ORDER OF_ THE COMMISSION __SeP~ 21, .1979 DATE 9/21/79 04 4O I0 2O 40 I I0 (Proposed Proposed) 02 03 (Proposed) ....... ~~ LAT. = 70°14'31.13" LO N G.:I48039' 19, 22" X: 666~488 Y = 5,9 39,890 PORTION OF T I0 N, R 14 E, UM SCALE I": I/2 MILE · CONDUCTOR HOLES PAD DETAIL SCALE 1"=300' I-- I (14-5- (~$- 5-/0-14) · X- 2 F$/-5-/0-/4] · (4.F,-6-/0-14) · (~$ - 6- I0-14) · X - 5 (45-1-10-15) · · SUMP CERTIFICATE OF SURVEYOR ~.a~iL~.~_,so,__~ I hereby certify that lam properly registered to practice land surveying in the State of Alaska and that this plat ~~,t~ ~ ~oc~tio~ ~u~7 o~ the .~ ,how~ ~U t~e .e~ thereon. This survey was made by me orundermy supervision ~.d ~ d~e.~o~ ~.~ other ~et~ ~. oo.~ct. ~ottom ho~e _. :' Z~~ e ~,..~ locations furnished by others. Dmte Surveyor ,, Note: All bottom holes are 8800'sub sea. Revised -BHL (X- 2) from 2450' to 2490' EWL. PJR 9/12/'1979 AS- STAKED PAD "X" Located in PROTRACTED SECTIONS Surveyed for C.J,R SOHIO PETROLEUM CO. Surveyed by F.M. LINDSEY 81 ASSOC. LAND ~ HYDROGRAPHIC SURVEYORS 2.502 West Northern Lights Boulevard Box 4-081 Anchorage Alaska PROPOSED DRILLING AND CC~PLETION PROGRAM Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated conductor to surface using Arcticset concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 Cu. ft. Arcticset cement. Blowout Preventer Program consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Directionally drill 12 1/4" hole to 8575'f TVD. Run 9 5/8" 479 L-80 Buttress casing to 8575' TVD and cement first stage with 1316 cu. ft. cement. C~ment second stage through D.V. packer collar at 2600'+- with 130 cu. ft. Permafrost C ~t. 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9454'~ TVD. Cement 7" liner to 500' inside 9 5/8" casing Shoe with 238 cu. ft. Class G cement with 18% salt. Run 7" 269 L-80 Atlas Bradford IJ-4S tubing with a production packer assembly at 8112'+_ TVD. A subsurface safety valve with dual control lines will be placed at 2000'+_. Displace tubing to diesel. Install and test ~I~as tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be sutmitted on Sundry Notice to follow. .. 6~ .7. e 9~ i. 0o 12. '3. '.: '. '.' ' '. 'Yes No ~attached ' . . . . ~-~, -- IS the. permit:fee ................... - . Is veil ~ ~ a ................... Is a mgimr~ ~y plat at~c~ ................... - ............ Is roll lmat~ p~o~ dism . ~s mffioi~nt ~e~ica~ ack. ge ava~le Zs ~.~a~r ~ o~y affff~t~ ~ . .............................. ~ ' ~ ~mt ~ appr~ ~fore tin,ay mit . . .... ~s ~ra~r h~e'a ~nd ~ force . ~..' ................ . . . Is a conser~tion ord~ ne~ .................................. . I's administrative approval needed ...- ................... ' ... Is cor~uctor st~'ing provided ........................................ It6m (1) Fee _A~prove ' Date (3) mm_i_n. .t - / ~.~- 14. Is enough cement ,~sed to circn]late on cOnductor and .surface ......... /~;%~ Will ce~nent tie in surface and intermediate or production strings . .'. ~ Will cement cover all known productive, horizons ...~ ................. ~- (4) Casg. '.7. Will m]rface casing protect fresh w~ter zones ...................... ~J~ ' 18. Will all cash%g give adequate safety in collapse, tension and burst. Does ROPE have sufficient pressure rating - Test to o~ psig . Approval Reccmme~ed: ..dditional Requirements: Geoloqy: Engineqring: LCs Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIXl .. No Special'effort has been made to chronologically organize this category of information. o. ~ .... SCHLUMBERGER----~ ~mmmmmm.mmmm.mmmmmmmm~ VERIFICATION LISTING 5VP 009.H03 VERIFICATION LISTING PAGE ** REEL HEADER SERVICE NAME :$ERVIC DATE :81/07/14 ORIGIN : REEL N~ME :REEL ID CONTINUATION # :01 PREVIOUS REEL COMMENT6 :REEL COMMENTS ** TAPE HEADER SERVICE NAME :SERVIC DATE :8i/07/14 ORIGIN :1070 TAPE NAME ~61760_ CONTINUATIO{-'F-TI~'f PREVIOU~ TAPE COMMENTS :TAPE COMMENTS EOF ********** ** FILE MEADER FIL£ NAME :SERVIC.O01 SERVICE NAME VERSION ~ DATE : MAXIMOM LENGTH : 1024 FILE TYPE PREVIOUS FILE ** INFORMATION RECORDS ** MNEM CONTENTS CN WN : FN : RANG: TOWN: SECT: COUN: STAT: CTRY: MNE~ PRES: SOHIO ALASKA PRDDHOE BAY 8 N, SLOPE ALASKA PRC001E ** RECORD TYPE 047 RECORD TYPE 047 UNIT TYPE CATE SIZE CODE 000 000 012 065 000 000 004 065 000 000' 012 065 000 000 004 065 000 000 004 065 000 000 002 065 000 000 008 065 000 000 006 065 000 000 004 065 UNIT TYPE CATE SIZE CODE mmmm mmmm mmmm mmmm mmmm 000 000 007 065 LVP 009.H03 VERIFICATION LISTING PAGE RECORD TYPE 047 ** ** COM~EMTS ** ************************************************************* JOB 10707,61760 TDT R$~ #1, 2i'APR'B! BTM. LCG INTERVAL TOP LOG INTERVAL TYPE Fbi]ID IN MOLE FLUID LEVEL 10402 9600 CRUDI FLOWING BIT SIZE : 8.5 iN. 9514. TO TD CASING SIZE : 7.00 iN. 9009. TO TD ** DATA FORMAT RECORD ** ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 4 1 66 1 B 4 73 60 9 4 65 .lin 0 1 66 0 DATUM SPECIFICATION BLOCKS MNEM SERVICE SERVICE UNIT API API AP1 API FILE SIZE PROCESS SAMPLE REPR iD ORDER # LOG TYPE CLASS MOD NO. LEVEL CODE DEPT FT 0 0 0 0 0 4 0 ! 68 $IG~ TDT C~ 0 40 1 0 0 4 0 I 68 FSIG TDT 0 0 0 0 O. 4 0 ! 68 LVP 009.H03 VERIFICATION LISTING DEPT 10420.000 SIGN 59.955 FSIG -0,007 FSIG 22.007 F$IG t8.584 F$IG 19,700 FSIG 15.7i5 F$IG 1b.412 FSIG 21,049 FSIG 34,037 F$IG 59,925 FSlG DEPT 10400.000 SIG~ DEPT 103.00.000 SIGN DEPT .10200.000 SIG~ DEPT 10100,000 $iG~ DEPT 10000.000 SIG~ DEPT 9900.000 SiGN DEPT 9800.000 SIGN DEPT 9700,000 SIGH DEPT 9600.000 $IG~ DEPT 9565,000 SiGN -999.250 FSIG ** FILE TRAILER FILE NAME :SERVIC.O0! SERVICE NAME : VERSION $ : DATE : MAXiMOM LENGTH : 1024 FILE-TYPE : NEXT F!bE NAME : EOF ** TAPE TRAILER ** SERVICE NA~E- :SERVIC DATE :81/07/14 ORIGIN 11070 TAP~: NAME :617b0 CONTINUATION # :01 NEXT TAPE MANE : COMMENTS :TAPE COMMENTS ** REED TRAILER SERVICE NAME ;$ER¥IC DATE 181/07/14 ORIGIN ; REEL NAME :REEL ID CONTINUATION 59.955 -0.000 20.215 16.289 16,888 12,872 14,610 17,428 33.252 39.725 -999,250 PAGE LVP 009.H03 VERIFICATION LISTING PAGE NEXT REEL NAME : CO~ENTS :REEL COMMENTS ~~%~ EOF ~%~~%%~ I1 000000 11 000000 111I O0 O0 111i O0 O0 11 O0 0000 11 O0 0000 11 O0 O0 O0 11 O0 O0 il 0000 O0 11 0000 O0 11 O0 O0 11 O0 O0 1111il 000000 111111 000000 666~66 000000 ~b6666 000000 66 00 00 66 00 00 66 00 0000 Ob O0 0000 66b~bbb6 O0 O0 O0 6bbbbbbb O0 O0 00 b6 66 0000 O0 6b bb 0000 O0 6b 66 O0 00 b8 b6 O0 O0 660666 000000 666666 000000 M M d d AAAAA P R R M M J d A A P R H M ~ dod A A P R R 7777777777 77777?7777 77 77 77 77 77 77 77 77 77 77 77 77 000000 000000 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 000000 000000 O LJ DDDD U U D D U U D D U U D D U U D D U U D D UUUUU DDDD OoO000 0~0000 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 000000 000000 5555555555 5555555555 55 55 555555 555555 55 55 55 55 55 55 55 55 555555 555555 'l 7 7 7 7 '7 7 '7 77 7'177777777 77 77 77 77 7'7 77 77 '7 ? 77 77 7'7 000000 000000 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 000000 000000 M H O00 EEEEE M H OCJO EEEEE *START* USER PCAD [10707,60050J ~IOHIT(]R SwS KLIOE34 JUL-?9. *STA. PT~- *START* USER PCAb [107(}7,60050J MONITOR SwS KLI. OE34 JUL-79. ,START* 8HI. P b949 DA'I'E 26-JAN-80 6949 DATk, 2b-dAN-80 14:20:08 14:2b:08 ¥¥ VV EEEEEEEEEE RRRRRRR~ YV V¥ EEEEEEEEEE RRRRRRR~ VV VV EE ~R RR VV VV E~, RR VV VV EE RR RR VV VV ~E HR RR VV VV ~~ R~RRRR~ VV VV ~E R~ R~ VV VV ~ R~ RR VV vv ~ ~ VV VV EE ~H VV ~E~~ R~ RR VV EE~E~EEE~ RR RR I11ii1 iiilli i1 I1 1I 11 ii 1i I1 11 YY Y~ YY 000000 000000 333333 000000 000000 333333 O0 O0 O0 O0 33 33 O0 O0 O0 O0 33 33 O0 0000 O0 0000 33 O0 0000 O0 0000 33 O0 O0 O0 O0 O0 O0 33 O0 O0 O0 O0 O0 O0 33 0000 O0 0000 O0 33 0000 O0 0000 O0 33 O0 O0 O0 O0 33 33 O0 O0 O0 O0 33 33 000000 000000 3~3333 000000 000000 3 3333 *START* USER PCAL [i0707,60050] JOB SHIP M[]NI]~.JR 8W$ KLlOE34 dgL-'19 *START* FILE: DS~.H:VERI~'Y.O03<057>[10707 b0050] CREATED: PRINTED: 2b-jAN-B0 i412~127 QUEUk SWiTChES: /FILE:f'URT /COPIES:I /SPACING: 1 /LI~ilT: ~1 6949 DATk 26-JAN-80 26-dAN-80 14:16:58 14:2b:08 10707~0050 LENGTH: 132 BYTES REEL NAME: P.C.A.L. SERV1CE NAME: EDiT REEL CONTINUATION NUMBER: 01 PREVIOUS REEL NAME: C[]SMkNT6: bls ~ORMAT CUSTOMER TAPE DATE: 80/ 1/26 TAPE HEADER LENGTH: 132 BYTES TAPE NAME: b0050 DATE: 80/ 1/20 SERVICE NAME: ED1T TAPE CIJNTINUAT1ON NUMBER: O1 PREVIOUS TAPE NAME: COMMkN%S: UNIQUE WELL IDENTI~'ICATION NUMBER iS 50-029-20397 TAPE COMMENTS ~ DIb/GR R~. ~'RJN 2670 TO 9510 * CSG 13.37" @ 2687' WhlGHT 72 LB/~ / BlT 12.25" / ~'bU1D ~ XC-POLYMER / DENS 10.00 / VI$C ~0,00 / PH 9.300 / RM 3.57 ~ 57 D~ / R~ 3.90 W 57 Dff / R~C ~.33 8 57 DF / B~T 150.00 * RUN T~O ..... DATE ~UGGED 11-21-79 * DIL/GR 9510 T(J 10460 - BHC/GR CNL/FDC 9290 TO 10400 * CSG 9.625 ~ 9514' / BiT 8.5" / kbOlD AC-POLYMER / D~NS 9.800 * V1SC 42.0 / PH 11.00 / RM 3.63 @~ 63 DF' / RMF 3.56 @ 59 , BHA 175 D~ LENGTH: 62 B~TES P'ILE NAME: EDIT .001 MAX1MUM PRYSICAL RECORD LENGTH: 1024 ~YTES PREVIOIiS FILE NAME: ~lbE COMMENTS DIL AND BHC GR [JN RUN TWO wERE TAKEN FROM THE CNL/~DC RUN TWO. LENGTH: C(]MPAN~: WELL: RANGE: Tt3WN: SECTION: COUNT~: STATE: RP.~CORD X-2 PRUDHOE 14E 10N 5 N. SL~P~ ALAS&A DATA [~"£..~I4.~A.T 6PECiI~ICAIi.JLON bENGTH: 650 BITES EN'I'R~' BLOCKS: 0 1 0 DATUM SPEiCI~'ICATi[JN BbOCI<,S: lC 1'001. I DEPT 2 SP DIL ] iLD 4 IbM 5 bbSU Dlb ~ GR [)iL 7 GR ~C 8 DT BHC 9 GR CNn 10 CALl CNb 11 DRHO f'DC 12 NPHI CN5 13 BHOB CNb 14 NRAT CNL 15 NCNL CNL 16 fCNL CNL SVURD~ UNITS APl APl APl APl FIhE# 6iZ5 EXP PRUC 5AM REP DEPT 6Hi. FT FT 0 0 0 0 0 4 0 0 1 68 0 0 MV 7 I 0 0 0 4 0 0 1 68 0 0 OH~M 7 12 4~ O 0 4 0 0 1 b8 0 0 OHMM 7 12 44 0 0 ~ 0 0 1 68 0 0 O~M~ 7 22 8 0 0 4 0 0 1 68 0 0 GAPI 7 31 32 0 0 4 0 0 1 68 0 0 GAPI bO 31 32 0 0 4 0 O I 68 0 0 OS/~ bO 52 32 0 0 4 0 0 1 68 0 0 GAPI 42 31 32 0 0 4 0 0 1 08 0 0 IN ~2 28 I 0 0 4 0 0 I 68 0 0 G/C3 42 44 0 ~ 0 4 0 0 1, 68 0 0 PU 42 68 2 0 4 0 0 i 68 0 0 G/C3 42 35 I 0 0 4 0 0 I 68 0 0 C/C 42 42 1 0 0 ~ 0 0 1 68 0 0 CPS 42 34 92 0 0 4 0 0 I 68 0 0 CPS 42 34 93 0 0 4 0 0 1 68 0 0 Db, P'I'i~ 10460.000 10400,000 10.300,000 10200,000 10100.000 10000,000 9900.000 9800,000 9700.000 9600.000 9500.000 MN EMONIC 8P CAIJI NRAT SP GP CALl NRAT SP CALl NRAT SP GR CALl NRAT SP GR CAh I NRAT SP GR CALl NRAT SP CALl NRAT 8P GR CAhl NRAT 8P GR CAbI NRA'I GR CALl NRAT SP GR CALl NRAT -35.500 115.938 8.500 2.846 -9.594 115.938 8.898 2.846 -76.125 ]4.750 8.578 2.479 -81.594 20.150 8.484 2.549 -79.625 21.031 8.422 2.605 -83.250 16.422 8.297 2.078 -83.031 21.594 8.344 2.574 -84.000 31.828 8.234 2.725 -14.000 103.875 9.15b 2.693 -16.625 82.750 18.031 3.936 -48.359 55.25O 8.773 4.754 MNEMONIC lbo GR DF, HO NCNb lbo GM DI~HO NCNb GR DRHO NCNb GR DRHO NCNb GR DRHO NCNb GR ORHO NCNb ILO GR DRHU NCNb R DRHO NCNb ILD GR DRHO NCNb ILO GR DRHO NCNL ILD GR DRHO NCNL VALUE 5.445 115.938 0.197 2566.000 5 523 1151938 0.05'7 2566.000 5.848 34.750 0.004 3378.000 2.494 20.156 -0,000 3448.000 2.398 21.031 -0.008 3356.000 23.219 16.422 0.025 3938.000 26.719 .006 3376.000 20.734 31.828 0.016 2882.000 10.398 10~.875 .001 2988.000 750 0.020 1670.000 1.681 .660 1396.000 MNEMONIC IbM DT NPH1 ~CNb ibm VT NPMt ~CNL ILM NPHI ~CNL DT NPHI FCNL ibm DT NPHi ibm DT NPHi FCNL ILM DT NPH1 ~'CNb IbM DT NPHI ~CNb ILM DT NPH1 ~CNL DT IbM DT NPHI b'CNb VALUE 5.b68 68.563 28.955 872.000 5.051 81.000 26.855 872.000 7.055 79.563 21.826 i266.000 2.623 94.188 22.949 1374.000 2.674 93.375 23.877 1220.000 19.141 81.000 O0 20.469 106.375 23.486 1237.000 21.484 86.375 25.879 1031.000 10.313 86.375 24.268 1130.000 1.575 105.375 38.330 431.500 1.396 5b.781 56.250 280.500 MNEMONIC bbSU RHOB LLSU GR ~HUB LbSU GR RHOB bbSO GR RHO8 bbSO GR bLSU GR RHOB hLSU GR RHOB bbSU GR RHO~ LLSU GR RH. OB LLSU GR RHO~ LLSU GR RHUB VALUE b.996 115.938 2.592 5.383 1i5.938 2.b17 17.531 34.750 2.471 8.398 20.i56 2.28'1 10.070 21.031 2.291 28.250 16.422 2.393 21.815 21.594 2.223 23.54'7 31.828 2.375 22.266 103.875 2.543 2.514 82.750 2.336 2.080 55.250 2.088 DEP'rB 9400. 000 9300.000 9200.000 9100.000 9000.000 8900.000 8800.000 8700.000 8600,000 8500.000 8400.000 MNEMONIC SP CALl NBAT SP GR CALI NRAT GR CAbI NRAT CALl NRAT SP GR CAt, I NRAT SP GR CALl NRAT SP CALl NRAT 8P GR CALl NRAT SP CAb! NRAT SP GR CALl NRAT SP GR CALl NRAT VAL -60 110 8 4 -57 90 -999-999 -58 91 -999-999 -58 90 -999-999 -60 90 -999-999 -63 78 -999-999 -61 283 -999 -999 -67 145 -999 -999 -60. 140. -999. -999. -58. 174. -999. -999. UE .87 .37 .71 .11 .625 .125 .680 .332 .625 .875 .250 .250 .375 .625 .250 .250 .875 .063 .250 .250 .875 .438 .250 .250 .875 .813 .250 .250 .875 .500 .250 .250 .063 .375 .250 .250 563 375 250 250 025 875 25O 250 MN EMUNiC ILD GR DRHO NCNb GR DRHO NCNb GR DRHO NCNb lbo GR DRHU NCNb ILD GR DRHO NCNb GR NCNb GR DRHO NCNb I LD GR DRHO NCNb GR DRHO NCNb GR DRHU NCNb ILD GR DRHO NCNb VALUE 1.189 .528 1455.000 1.427 66.063 .000 1.287 -999.250 -999,250 -999.250 1.212 -999.250 -999 250 -999~250 1.369 -999 250 -999:250 -999.250 1 278 -999~250 -999 250 -9991250 2.418 -999.250 -999.250 -999.250 I 818 -999~250 -999.250 -999.250 2.553 -999 250 -999.'250 -999.250 3.615 -999.250 2999.250 999.250 1.613 -999.250 '999.250 -999.250 MN ibm UT NPHi ~'CN~ iLM DT NPHI PCNb DT NPHi IbM DT NPHI P'CNb IbM DT NPHI PCNL DT NPH1 ibm DT DT NPHI DT NPHI IbM DT NPHi DT NPHI ~CNL VAbU E i .261 71.375 46.484 363. '~50 1.511 71.750 49.854 376.750 1.336 -999.250 -999.250 -999.250 1.2'11 -999.250 -999.250 -999.250 1.411 -999.250 -999.250 -999.250 1.303 -999.250 -999.250 -999.250 2.348 -999.250 -999.250 -999.250 782 -9919:250 -999.z5 r, 0 -999.250 2.555 -999.250 -999.250 -999.250 3.402 -999.250 -999.250 -999.250 i .646 -999.2550 -999.2 0 -999.250 MNEMONIC Gb8U RHOB GR bb8O GR RMOM bbSO GR RHOB bbSO GR RHOB LbSO GR bbSU GR RHOB GR RHOB GLSU GR RHOB bLSU GR RHOB bhSO RHOB VAbUE 2.008 ~4.~75 2.31i 2.389 b~.063 2.250 1.9'74 -999.250 -999.250 1.831 -999.250 -999.250 2.068 -999.250 -999.250 1.846 -999.250 -999.250 2.97'1 -999.250 -999.250 2.287 -999.250 -999.250 3.898 -999.250 -999.250 4.707 -999.250 -999.250 2.275 -999.250 -999.250 8]00.000 8200.000 8100,000 8000,000 7900,000 7@00,000 7700,000 7600.000 7500.000 7400.000 7300.000 MNEMONIC SP GR CAb I NRAT SP CALl NRAT GR CALl NRAT SP GR CALl NRAT 8P GR CALl NRAT SP GR CALl NRAT GR CALl NRAT SP GR CALl NRAT SP GR CALl NRAT SP CALl NRAT SP CALl NRAT V AL -55 156 -999 -999 -59 104 -999 -999 -177 92 -999-999 -188 85 -999-999 -194 90 -999-999 -20O 88 -999-999 -204 77 -999-999 -208 85 -999-999 -212 86 -999-999 -213 88 -999-999 -221 123 -999-999 UE; .875 .125 .250 ,250 .125 .313 .250 .250 ,875 .375 ,250 ,250 .875 ,875 .250 ,250 .375 .125 .250 .250 .375 .375 .250 .250 ,125 .000 ,250 ,250 ,125 ,750 ,250 ,250 .125 .438 .250 .250 .625 .000 .250 .250 .125 .375 .250 .250 MNLMONIC GR DRHO NCNb ILD GR CNL GR DRHO NCNb GR DRHO NCNb GR DRHO NCNb iLD GR DRHO NCNb DRHO NCNb iLD GR DRHO NCNb GR ORHO NCNb ILD GR DRHO NCNb lbo GR DRHO NCNb VALUE 1.512 -999.250 -999.250 -999.250 ,852 -99 ,250 -999,250 -999'250 1.890 -999,250 -999,250 -999,250 051 - 9 :2so -999.250 -999.250 2,063 2999.250 999.250 -999.250 31i -99 '250 . -999,250 -999,250 2,760 -999 250 -999:250 -999.250 99-096 -9 ,250 -999,250 -999,250 2.012 -999.250 2999.250 999.25O 861 -999 250 -999:250 3.234 -999 25 -999:25g '999.250 MNeMONiC IbM DT NPHi fCNb ILM DT NPHI PCNL NPHI ibm DT NPfil PCNb iLM FCNB DT NPH1 DT NPHI f'CNL DT NPHI PCNL DT NPHi FCNL IbM DT NPHI FCNL IbM DT NPHI VALUE 1.563 -999,250 -999.250 -999,250 1.882 -999,250 -999,250 -999,250 1.926 -999.250 -999.250 -999.250 3.115 -999,250 -999,250 -999,250 2,096 -999,250 -999,250 -999,250 2.303 -999.250 2999.250 999~250 2.723 -999.250 '999i250 -999.250 .99g '115 .250 -999.250 -999.250 2.066 -999 "50 -999'.Z250 -999.250 1,883 -999.250 -999,250 -999,250 3.090 -999.250 -999.250 -999.250 MNEMONIC bbSO GR RHOB bb8U GR RHOB bh8U GR RHU~ bbSO GR RHU0 bh8O GR RHO0 66BO GR RHO~ bb8O GR RHOB GR RHOB LD8U GR RflOB bbSO GR RHOB bbSO GR RHOB VALUE 2.447 -999,250 -999.250 2,480 -999.250 -999.250 2.309 -999.250 -999.250 3.908 -999,250 -999,250 2,695 -999,250 -999,250 2,848 -999.250 -999,250 3.348 -999,250 -999,250 2,0i5 -999.250 -999,250 2,723 -999.250 -999,250 2,415 -999.250 -999,250 .3,418 -999,250 -999.250 DEr'TH 7200,000 7100,000 7000.00O 6900,000 6800.000 6700,000 6600,000 6500,000 6400.000 6300.000 6200.000 8P CAI,1 NEAT GR CALl NRAT SP GR CALl NRAT SP GR CAB1 NRAT SP CALl. NRAT CALl NRAT GR CALl NRAT GR CALl NRAT SP GR CALf NRAT 8P GR CALl NRAT 5P G~ CAbi NRAT VAbU -219. 84. -999.-999. -222. 8]. -999 ·-999. -95. 85. -999.-999. -72. 88. -999.-999. -67. 79. -999.-999. -130. 63. -999.-999. -138. 55. -999.-999. -97. 59. -999.-999. -45. 82. -999.-999. -77. 53. -999 ·-999. -55, 'l 4. -999.-999. 375 875 25O 25O 250 625 250 250 188 438 250 250 969 250 25O 250 250 000 250 250 500 25O 25O 25O 438 156 250 250 250 188 250 250 000 313 250 250 750 219 250 250 250 188 250 25O M.N~M[3N IC ILD GR DRMO NCNB GR DRHU NCNB GR DRHO NCN~ iLL) GR ORHO NCNb ILD GR DRHO NCNb GR DRHO NCNb G~ DRHO NCNB GA DRHO NCNB GA DRMO NCNb ILD GA DRHO NCNb G~ DRHO NCNb VALUE 2.385 -999.250 -999.250 -999.250 2.816 -999.250 -999.250 -999.250 4.430 -999.250 -999.250 -999.250 3.803 -999.250 -999.250 -999.250 2.371 -999.250 -999.250 -999.250 2 898 -999~250 -999.250 -999.250 3.270 .-999.250 999.250 -999.2.50 9~-398 -9 .250 -999.250 -999.250 4.668 -999.250 -999.250 -999.250 2.842 -999.250 :999.250 999.250 4.621 -999.250 -999.250 -999.250 MNeMONiC DT NPHI ~CNL DT NPHI f'CNb ~T NPMI fCNb DT NPMI ~CNb 16M NPHI f'CNL ibm DT NPMI 1, LM DT NPHI P'CNL IbM DT NPHi FCNL IbM DT NPHi fCNb DT NPHi I. LM DT NPHi fCNb VALUE 2.381 -999.250 :9 ,.25o 99 .250 2.668 -999.250 '999.250 -999.250 4.176 -999.250 -999.250 -999.250 3.605 -999.250 -999.25O -999.250 2.297 -999.250 -999.250 -999.250 3 283 -999:250 -999,250 -999.25O 3.707 -999.250 -999.250 -999.250 4.844 -999.250 -999.250 -999.250 4.289 -999.250 -999.250 -999.250 3.252 -999.250 -999.250 -999.250 3.980 -999.250 -999.250 -999.250 MNEMONIC LbSU GR RMO0 LbSU GR RHOB bb8U GR hhSO GR RHOB bhSU GR 6LSU GR RHOB bU8U GR RHOB bbSU GR LbSU GR RHOB bbSU GR bLSU GR 3.303 -999.250 -999.250 3.191 -999.250 -999.250 4.013 -999.250 -999.250 4.172 -999.250 -999.250 2.783 -999.250 -999.250 6.445 -999.250 -999.250 7.152 -999.250 -999.250 '/.012 -999.250 -999.250 4.520 -999.250 -999.250 '7.285 -999.250 -999.250 3.840 -999.250 -999.250 V DEPTH 6100.000 b000.000 5900,000 5800.000 5700.000 5600.000 5500,000 5400.000 5.300,000 5200.000 5100.000 MNEMON 1C CALI NRAT GR CALl NRAT SP CALl NRA~ SP GH CALl NRAT SP CALl NHAT SP GR CALl NRAT SP CALl NRAT SP GR CALl NRAT CALl NRAT GR CALl NHAT 8P GR CA£,1 NRAT VAL -107 53 -999-999 -97 33 -999-999 -69 47 -999-999 -79 -999 -63 44 -999-999 11 81 -999 -999 4 68 -999 -999 -69 45 -999-999 -17 61 -999-999 U .250 .438 .250 .250 .563 .250 .250 .250 .281 .b88 .250 .250 .281. .719 ,250 .250 .844 .250 .250 .250 .250 .438 .250 .250 .500 .188 .250 .250 .969 .031 .250 .250 .109 .469 .250 .250 -27.b09 53.094 -999.250-999.250 -21. 58. -999.-999. 141. 25O 250 MNEMONIC GR DRHO NCNi, ibD GR DRHO NCNb ILD GR DRHO NCNb 1LD GR DRHU NCNb iLL GR DRHO NCNb ILD GR DRMO NCNL GH DRHO NCNL R DRHU NCNb iLO GR DRHO NCNb LD R DRHO NCNb 1 LD GR DRHO NCNb VALUE 1.474 -999.250 -999.250 -999.250 9919.526 - .250 -999 250 999;250 2.219 99.250 -999.250 -99~ .094 ,250 -999.250 -999.250 1.711 -999.250 -999.250 -999.250 3.449 -999.250 -999.25 -999.25~ 3.775 -999 250 -999~250 -999.250 9~.424 -9 .250 -999.250 -999.250 3,055 999 250 999:250 -999.250 . 2 420 999~250 -999 250 999:250 3.736 -999 250 -999~250 -999.250 MN EMONiC DT NPHI fCNb DT NPHI ~CNL DT NPHI ~CNb DT NPHI ~'rCNh ILM DT NPH1 PCNb DT NPHI ~CNL IbM DT NPHI I.' C NJ.:. DT NPHI ibm D' N~HI f~CNb DT NPHi PCNb IbM DT NPHI ~CNL VALUE i,79b -999.250 -999.250 -999.250 1.848 -999.250 -999.250 -999.250 2.510 -999.250 -999.250 -999.250 1.92! -999.250 -999.250 '999.250 2.027 -999.250 -999.250 -999.250 3.219 -999.250 -999.~50 -999. 50 3.416 999. 50 -999.250 581 -999.250 -999.250 2,965 -999 250 -999:250 -999.250 -999: 50 -999.250 -999.250 3.752 -999.250 -999.250 -999.250 MNEMONIC bhSO RHOB bLSU GR RHUB LL8U GR bhSU GR RHUB LL8U GR RHOB bbSU GR bhSO GR RHUO bbSU GR RHOB bbSO GR RHO~ LL8U GR RHOb 5580 GR RHOB VALUE 0.420 -999.260 -999.250 b.949 -999.250 -999.250 6.277 -999.250 -999.250 5.050 -999 ~50 -999."250 5.984 -999.250 -999.250 3.564 -999.250 -999.250 4.184 -999.250 -999.250 50 -999.250 3.510 -999~250 -999.250 3.503 -999.250 -999.250 ~.2bb -999.250 -999.250 DEPTH 5000,000 ~900.000 q800.O00 q?O0,O00 4e, o9.ooo 4500,000 ~400.000 4300.000 4200.000 4100,000 ~000.000 MNEMONIC SP CALl, NEAT SP GR CALl NEAT SP CALl NRAT SP CALl NRAT SP CALl NEAT SP GR CALl NRAT SP GR CALl NEAT SP CALl NRAT SP GE CALl NRAT SP GR CALl NEAT SP CALl NRAT VAL -72 -999 -999 -33 74 -999-999 72 -999 -999 -104 36 -999-999 -89 43 -999-999 -40 67 -999-999 -56. 59. -999.-999. -70. 67. -999.-999. -99. bO. -999.-999. -94. -999. -999. -105. 55. -999.-999. UE .906 .906 .250 .25O .859 .688 .250 .250 .359 .375 .250 .250 .125 .875 .250 .250 .375 .313 .250 .250 .609 .438 .250 .250 156 25O 25O 250 125 313 250 250 625 938 25O 25O 125 125 250 250 125 719 250 250 MNEMON1C ILD 0R DEHO NCNL ILD GR DRHU NCNL GR DRHU NCNb lbo GR DEMO NCNb ILD DRHU NCNb 1LO GR DRHO NCNb ILD GR DRHO NCNb ILO GR DRHO NCNb GR OREO NCNb iLD GR NCNb ILD GR DRHO NCNb VALUE 2.330 -999,250 -999.250 -999.250 3.564 -999.250 -999.250 -999.250 5.875 -999.250 999.250 -999.250 1-425 -999.250 :999.250 999.250 1.515 ..999.250 999.250 -999.250 4.539 -999.250 -999.250 -999.250 5.117 -999.250 -999.250 -999.250 0.082 -999.250 -999.250 -999.250 5.496 -999.250 -999.250 -999.250 6.930 -999.250 -999.250 -999.250 6.699 -999.250 -999.250 -999.250 MNEMONIC IbM DT NPMi ~CNb IbM DT N PHi fCNb IbM OT NPMI ibm DT NPHi fCNL IbM DT NPHI ~'CNb DT NPHi fCNL UT NPHi ~CNb DT NPHI ibm DT NPMI ~'CNb ibm DT NPHI FCNL iLM NPH1 ~CNb VALUE 2.490 -999,250 -999.250 -999.250 3.824 -999.250 -999.250 -999.250 5.328 -999.250 -999.250 -999.250 1.574 -999.250 -999.250 -999.250 1.690 -999.250 -999.250 -999.250 4.445 -999.250 -999.250 -999.250 5.219 -999.250 -999.250 -999.250 5.277 -999.250 -999.250 -999.250 5.449 -999.250 -999.250 -999.250 6.324 -999.250 -999.250 -999.250 6.719 -999.250 -999,250 -999.250 MNEMONIC bb8O RHOB bbBU GR RHUB bbSU GR RHO~ bbSU GR RHUB bbSU GR RHUB GR RHOB bbSU GR RHUS hbOU GR RHOB LbBU GR RHU~ bbSU GR bbSU GR RHOB VAbU5 5.420 -999.250 -999.250 ~.059 -99 .250 -999.250 ~.309 -999.250 -999.250 4.441 -999.250 -999.250 0.719 -999.250 -999.250 4.875 i999.250 -999.250 6.242 -999.250 -999.250 0.094 -999.250 -999.250 0.770 -999.250 -999.250 "1.113 -999.250 -999.250 8.859 -999.250 -999.250 OI~PTH 3900,000 3800.000 3700,000 350O. 000 3400.000 ].]00.000 3200,000 3100.000 3000.000 2900.000 MNEMONIC SP GR CALl NRAT SP GR CALl NRAT GH CALl NRAT GR CALl NRAT 8P GR CAbI NHAT 8P GR CALl NRAT GA CALl NRAT SP GR CALl NRAT SP GR CALl NRAT SP GR CALl NRAT SP GR CALl NRAT VAL -9O -999 -999 -110 51 -999-999 -89 71 -999-999 -122 58 -999-999 -110 63 -999-999 ~6 999 -'999 -79 60 -999-999 -103 48 -999-999 -63 71 -999-999 -59 59 -999-999 -7O 67 -999-999 UE .125 .313 .250 .250 .688 .875 .250 .250 .125 .500 .250 .250 .375 .438 .250 .250 .188 .219 .25O .250 .625 .813 .250 .250 .125 .053 .250 .250 .025 .625 .250 .250 .375 .563 .250 .250 .875 .656 .250 .250 .906 .563 .250 .250 MN BMON lC ibD GR DRMO NCNb ILD GR DRHO NCNb DRHO NCNb iLO GR DRHU NCNb GR DRHO NCNb ILD GR CNb iLD GR DRHO NCNb iLD GR DRHU NCNb iLO GR NCNb ILD GP DRHO NCNb lSD NCNb VALUE 8.453 '999 250 -999:250 -999.250 .99~ '293 .250 -999.250 -999.250 6.560 -999.250 -999.250 -999.250 8.633 -999.250 -999.250 -999.250 9.211 -999.250 :999.250 999.250 9:133 -999 250 -999 250 -999:2so 7.188 -999.250 -999.250 9 ~ -9 9.250 .99~ '500 .250 -999.250 '999.250 5.063 -999.250 -999.250 -999.250 4.008 -999,250 -999 250 -999:250 3.426 .-999.250 999.250 -999.250 NN ibm PT ~'CNb ibm DT NPHI f'CNb ibm DT NPHi ~CNb ILM DT NPH 1 fCNL ILM DT NPHI ~'CNL ILM DT ibm DT I~-CNb DT NPHi ~"CNL DT NPH1 ~CN~ DT NPHi ILM DT NPHi ~CNb VALUE '1.711 -999.250 -999.250 -999.250 5.324 -999.250 -999.250 -999.250 5.539 -999.250 -999.250 -999.250 8.109 -999.250 -999 250 -999:250 8.172 -999.250 -999.250 -999.250 8.016 -999.250 -999.250 -999.250 6.281 -999 250 -999:250 -999.250 5.488 -999.250 -999.250 -999.250 4.61.3 -999.250 -999.250 -999.250 3.064 -999.250 -.999.250 999.250 3.379 999.250 999.250 -999.250 MNEMONIC 558U GR RHO~ 668U GR KNOB 5L8U GR RHOB LL8U GR bLSU RHOB 6580 GR RHOB 6580 GR KNOB bbSU GR LLSU GR RHUB bbSU GR RHOB 6680 GR RHOB VALU'~ 9.0.:]9 -999,250 -999.250 8.401 -999.250 -999.250 6.545 -999.250 -999.250 10.5t0 -999.250 -999.250 10.33~ -999.250 -999.250 8.703 -999.250 -999.250 ~.909 -999.250 -999.250 9.06] -999.250 -999.250 5.591 -999.250 -999.250 4.754 -999.250 -999.250 -999.250 -999.250 [/ DEPTH 2800.000 2'700.000 2670.000 MNEMONIC SP CAb1 NRAT GR CALl NRAT SP CALl NRAT VAL -99 -999 -999 31 -999 -999 -999 -999 -999 -999 UE .375 .406 .250 .250 .875 .266 .250 .250 .25O .250 .250 .25O MN EM(]N1C ILD DRHO NCNb DRHU NCNb OR DRHO NCNb VALUE 2.492 -999.250 -999.250 -999.250 1.797 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 MN ~MONIC ILM DT NPH1 ~CNb IbM DT NPHi ~'CNL UT NPHI fCNG VAbU~ 2.566 -999,250 -999.250 -999.250 .99~ '932 .250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 MNEMONIC bbSU RHU~ bL, SU GR RHOB LBSU GR RHOS VAbU~ ~.~U5 -999,250 -999.25o ~.041 -99 .250 -999.250 -999.250 -999.250 -999.250 $1..]MMAH~ UI~' DATA I.,~ECURDS NUMB&R OF RECORDS: 1039 LENG~H Of' RECURDS: 906 BYTES LENGTH [JF LAST R~CC{JRD: 71,0 BYT~ZS FIbE ThAIbER i,ENGTN: 62 BNTES ~iLE NAME: EDiT .001 MAXIMUM PHYSICAL RSCURD LENGTH: NEXT ~'ILE NAMe: 1024 BYTES TAPE TRAILER LENGTH: TAP~: NAME: 600 DATE: 80/ 1/20 S~RVICE NA~E: EDIT TAPE CUNTINUATiON NUM~H: O1 NE,XT :~APE NAMe: 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 1111 1111 000000 7777777777 000000 7777777777 00 O0 77 00 00 77 O0 0000 77 00 0000 77 00 O0 O0 77 00 O0 O0 77 0000 O0 77 0000 00 77 00 O0 77 00 O0 77 000000 77 000000 77 000000 777777'7777 000000 7777777777 O0 O0 77 00 00 77 00 0000 77 O0 0000 77 00 O0 O0 77 00 OO O0 77 0000 00 77 0000 O0 77 O0 OO 77 O0 O0 77 000000 77 000000 77 666666 666666 66 66 66 66666666 66666666 66 66 66 66 666666 666666 66 66 66 66 000000 44 44 000000 44 44 O0 O0 44 44 O0 O0 44 44 O0 0000 44 44 O0 0000 44 44 O0 O0 O0 44444444 O0 O0 O0 44444444 0000 O0 44 0000 O0 44 O0 O0 44 O0 O0 44 000000 44 000000 44 44 44 333333 333333 33 33 33 33 33 33 333333 333333 666666 666666 33 66 33 66 33 66 33 66 66666666 66666666 33 66 66 33 66 66 33 66 66 33 66 66 666666 666666 GGGG H H BBBB G H H B ~ G HHHHH BBBB G GGG H H 0 B G G H ~ B B GGG H H BBB~ PPPP RRRR U U P P R R U U P P R R U U PPPP RRRR U O P R R U U P R R U O P R R UUUUU DDDD H H OOO EEEEE D D H H 0 O E D D HHHHH O O EEEE D D H H 0 O E D D H H 0 0 E DDDD H H 000 EEEEE ,START* USER PCA6 MONITOR 8wS KLIOE40 *START* USER PCAL MONITOR 8~6 KLI0E40 [10107,60436] SEP 80. *START* [10107,60436] SEP 80. *START* JOB SHiP SEO. dOB SHIP SEQ. 7993 DATE 28-SEP-80 7993 DATE 28-SEP-80 13104125 13:04125 SSSSSSSS BH ~H SSS$SSSS ~ ~ SS M~ M~ SS ~H ~H SS H~ H~ SS HH HH SSSSSS HHHHHHHHHH SSSSSS HHHHHHHHHH SS HH HH SS HH HH SS HH HH SS HH HH SSSSSSSS HH HH SSSSSSSS HH HH iii III I I i I I I I I i I III III III III I i 1 I I I I I I I III III PPPPPPPP PPPPPPPP PP PP PP PP PP PP PP PP PPPPPPPP PPPPPPPP PP PP PP PP PP PP TTTTTTTT~I O,OOO{JO TTTTTTTTT~ 0,00000 TT OO OO TT 00 OD TT O0 DO TT OO OD TT 0[] ~O TT OO OO TT OO OD TT 00 OO ,TT (JO GO TT O0 O0 TT 000000 TT 000000 *START* USER PCAL [10707,60436] dOB SHIP SEO. 7993 MONITOR SWS KLIOE40 SEP-80. *START* ~iLE: DS~H:SHIP.T.O<255>[I0701 6043b] CREATED: 28-SEP-80 P~INTED: 28-SEP-80 1~:04:39 OUEUE SWITCHES: /~ILE:~'[JRT /COPIES:I /SPACING:I /LIMIT:122 /FORMS:NORMAL DATE 28-SEP-80 12:52:13 13:04:25 SH1PPING INSTRUCTIONS iSSUED 25-SEP-80 12:24 SHIP TO : VENTURA, CALIi;'ORNIA 93003 P¢C¢ B~ GHB PCCC V¥ Yq ELLEELLEEL RRRBRRRH ¥¥ ¥¥ EEELEELLLL RRRRRRRR VV VV LE RB RR VV VV ~,~ RR RR VV VV &k HB RR VV VV EE RH RR VV VV ELE£LE~E RRRRRRRH VV VV EEEEEEEE RRRRRRRR VV VV kE R~ RR VV VV EE RR RR VV VV LE RR RR VV VV EL RR R~ VV ELLEEEEELL BP RR VV EEEEEEEEEE RR RR IIIIII IIiiii II II II ii II II II II II Ii iiiiii IIIIII YY YY YY YY YY YY YY YY Y~ YY YY YY YY YY YY YY YY YY 000000 000000 000000 000000 11 O0 O0 O0 O0 1111 O0 O0 O0 O0 1111 O0 0000 O0 0000 11 O0 0000 O0 0000 11 O0 O0 O0 O0 O0 O0 11 O0 O0 O0 O0 O0 O0 11 0000 O0 0000 O0 11 0000 O0 0000 O0 11 O0 O0 O0 O0 11 O0 O0 O0 O0 11 000000 000000 Illl 000000 000000 1111 11 11 ,$TARA~* USER PCAL [10707,60436] dOB SHIP SEQ. MONITOR S~S KLIOE40 SEP-80. ,START* PILE: DSKH:VERIFY.O01<057>[10707 b0436] CREATED: PRINTED: 28-SEP-80 13:0~:47 QUEUE SWITCHES: /FILE:fORT /COP1ES:I /SPACING:! /LIMIT:122 /FORMS:NORMAL 7993 DATE 28-SEP-80 28-SEP-80 13:03:43 13:04:25 SCHLUMBERGER COMPUTING CENTER 10707,60436 REEL HEADER L~NGTH: 132 BYTES REEL NAME: P.C.A.L. SERVICE NAME: EDiT REEL CONTINUATION NUMBER: 01 PREVIOUS REEL NAME: COMMENTS: LIS FORMAT CUSTOMER TAPE DATE: 80/ 9/25 TAPE HEADER LENGTH: 132 BYTES TAPE NAME: b04]6 DATE: 80/ 9/25 SERVICE NAME: EDiT TAPE CONTINUATION NUMBER: Ol PREVIOUS ~APE NAME: COMMENTS: UNIOUE WELL IDENTIFICATION NUMBER IS 50-029-20]97 EOF ~ILE MEADER LENGTH: b2 ~YTES F~ILE NAME: EDIT .001 MAXIMUM PHYSICAL RECORD LENGTH: PREVIOUS ~ILE NAME: FI.LE COMMENTS PASS ONE. 1024 BYTES WELL SITE IN~,ORMATION RECORD LENGTH: C(]MPANY: WELL: ~'IELD: RANGE: TOWN: SECTION: COUNTX: STATE: 178 BYTES SOHIO ALASKA PETRO. CO. X-2 PRUDH,OE BAY 14E 1ON 14E N. SLOPE ALASKA DA~A ~t]RMA~ ~PECIFICATION bENGtH: 450 ENTRY BLOCKS: %YPE 0 ~P 66 CODE ENTRY 0 DATUM SPEC IF1CA'I iON BBOCKS: ~NTR¥ IC I'001., 1 DEPI 2 GR IDTM GRBU TDTM 4 SiGN ~DIM 5 FSIG TDTM 7 T~BK IDTM 8 TNG TD~M 9 T~G IDTM 10 TRA~ TDTM 11 TNOD IDTM SVORD# UNITS AP1 AP1 APl API FILE# SIZE EXP PROC SAM REP DEPT SHiesT FT 0 0 0 0 0 4 0 0 1 68 0 0 GAPI 51 31 32 0 0 4 0 0 i 68 0 0 GAPI 51 31 ]2 0 0 4 0 0 1 68 0 0 CU 51 40 1 0 0 q 0 0 1 b8 0 0 CU 51 40 2 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 q 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 · CPS 51 39 99 0 0 4 0 0 1 68 0 0 C/C 51 42 0 0 0 4 0 0 I 68 0 0 51 43 0 0 0 4 0 0 1 68 0 0 10420.000 10400.000 10]00.000 10200.000 10100.000 1O000.00O 9900.000 9800.000 9700.000 9600.000 9565.000 MNEMONIC GR TNBK TRAT GR GR TNBK TRAT T~AT GR TNBK TRAT GR TNBK 'I'RAT GR TNBK TRAT GR TNBK TRAT GR ~NBK GR TNBK TRAT GR I~NBR TRAT VAL -999 -999 -999 200 500 1 19 110 2 12 143 2 15 157 2 9 187 2 15 201 2 15 216 2 54 265 3 59 0 5 -999 -999 -999 UE ,000 .000 ,000 .000 .000 .035 .450 .722 .343 .000 .714 .363 .250 .211 .631 .350 .578 .038 .000 .450 .288 .350 .446 .760 .350 .933 .569 .650 .625 .963 .25O .250 .250 MNEMON GRBU TMOD GRBU 2FBK TMOD GRBU TFBK TMOD GRBU TFBK TMOD GRBU UCFBK TMOD GRBU TFBK TMOD GRBU TF'BK TMOD GRBU TMOD GRBU TFBK TMOD GRBU TFBK TMOD GRBU IFBK TMOD lC VAL ~999 999 -999 499 159 3 19 12 1 12 14 1 14 15 1 9 18 1 14 27 1 15 23 1 55 37 1 59 0 0 -999 -999 -999 UE .000 .000 .000 .875 ,600 .558 .351 .350 .732 .235 .450 .733 .482 .050 .732 .613 .900 .733 .732 .650 .733 .356 .800 .732 .805 .000 .001 .800 .000 .002 .250 .250 .250 MNEMONIC SIGN TNG TNG SIGN TNG SIGN TNG SIGN TNG SIGN TNG SiGN TNG SIGN TNG SIGN TNG S1GM '~NG SIGN TNG VALUE -999.000 -999.000 -0.015 999.750 21.828 945,818 18.232 934.332 19.880 932,334 15.341 944.320 16.794 911.361 21.468 896.380 34.052 861.423 59.895 2.747 -999.250 -999.250 MNEMUNIC FSiG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG FSIG TFG VALUE -999.000 -999.000 0.015 500,125 18.402 466.025 16.169 458.281 10.364 451.037 13.561 458.031 14.221 444.417 17.607 437.297 31.349 434.299 54.515 2.873 -999.250 -999.250 SUMNAt"~¥ Ell; DAIA IqECURD,S NtlMBEm (iF RECORDS: 75 LENGT~ Of' ~EC(]RDS: 1018 f~¥TES LENGTH O~- LAST RECt3RD: 402 B¥~ES ~'ILE TRAILEB LENG1'H: b2 H~TES ~'ILE ~IAME: EDIT .001 MAXIMUM PHIS1CAL RECORD LENGTH: NEXT k lLE NAME: 1024 BYTES E 0 F F"ILR HEADES LENGTH: 62 O~TES FILE NAME: EDi~ .002 MAXIMUM PHYSICAL RECORD LENGTH: PREVIOUS FILE NAME: [ILE C~ENTS PASS T~O AND THREE. 1024 WELL SITE 1N~.(]RMATi£IN RECORD I, ENGIH: C~MPANY: ~ELL: FIELD: RANGE: SECTION: COUNT~: STA~E: 178 BITES SOHIO ALASKA PETRO. CO. X-2 PRUD~OE BAX 14E ION 14E N. SLOFE ALASKA DATA ~OR~AI SPECI~'ICATIUN LENGTH: 850 BYTES ENTRX BLOCKS: 'fYPE 0 SIZE REP CODE ENTRY 1 66 0 DATUM 8PECI~'iCATION BLOCKS: lC TOOL ! DEP~ 2 GR IDTM GRBU TDTM 4 61GM TDTM 5 ~'SIG IDTM 6 TNB~ IDTM 7 TFBK TDTM TNG ~DTM 9 TFG TDTM 10 T~AI IDeM 11 TMOD TDTM 12 G~ ~DTM GRBU TDTM $IGM TDTM 15 FSIG TDTM lb TNOK TDTM 17 T~BK TDTM 18 TNG TDTM 19 T~G TDTM 20 TPA~ TDTM 2l TMOD TDTM SVORD~ UNITS API AP1 API APl Flhk~ SIZE EXF PROC SAM REP DEPT SHIFT FT 0 0 0 0 0 4 0 0 1 68 0 0 GAPi 51 31 32 0 0 4 0 0 I 68 0 0 GAPI 51 ]1 32 0 0 4 0 0 I 68 0 0 CU 51 40 1 0 0 4 0 0 I 68 0 0 CU 51 40 2 0 0 4 0 0 I b8 0 0 CPS 51 39 99 0 0 4 0 0 I b8 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 I b8 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 C/C bi 42 0 0 0 4 0 0 1 68 0 0 51 43 0 0 0 4 0 0 1 68 0 0 GAPI 51 ]1 32 0 0 4 0 0 1 58 0 0 GAPi 51 31 32 0 0 4 0 0 I 68 0 0 CO 51 40 1 0 0 4 0 0 1 b8 0 0 CU 51 40 2 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51 ~9 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 C/C 51 42 0 0 0 4 0 0 1 68 0 0 51 43 0 0 0 4 0 0 1 68 0 0 DEPTH 10420.000 1O400.000 10300.000 10200.()00 10100.000 10000.000 9900.000 9800.000 9700.000 MNEMONIC TNBK TRAT SIGN TNG GR TNB~ TRAT SIGN TNG GR TNBK TRAT SIGN TNG GR INBK ~RAT SlGM TNG GR TPAT SIGM TNG TNBK TRAT SiGN TNG GR TRAT $IGM I'NG GR TNBK TRAT SIGM TNG GR INBK TRAT SIGM VAL -999 -999 -999 59 1 200 435 1 0 989 23 235 2 21 939 16 248 2 lg 924 21 253 2 19 940 14 277 2 15 942 18 297 2 16 921 UE .000 .000 .000 .955 .248 .000 .391 .001 .O00 .513 .O5O .691 .485 .648 .32b .700 .563 .440 .056 .844 .85O .562 .520 .521 .325 .900 .556 .012 .476 .322 .350 .b76 .295 .554 .099 25.350 302.799 2.585 20.794 902.871 65. 342. 3. 33. 868. 300 039 573 414 MNEMONIC GRBU TFBK TMOD FSIG GRBU TMOD FSiG TFG GRBU TFBK TMOD ~SIG TFG GRBU ~FBK IMUD FSiG TFG GRBU IfBK FSIG TFG GRBU TFBK IMOD FSIG IFG GRBU TFBK ~[MOD FOIG TFG GRBU TfBK TMOD FSiG GRBU TFBK TMOD FSIG TfG V ALI]E -999.000 -999.000 -999.000 59.955 0.375 500.000 83.250 1.841 0.015 500.000 24.594 26.600 1.732 18.701 462.528 16.979 21.500 1.732 15.½8o 455. 83 21.473 2~.650 1.733 18.596 460.280 15.231 26.450 1.732 12.902 458.031 18.352 32.850 1.733 14.~46 448. 39 25.718 35.800 1.732 17.832 436.048 6 4~:~ 43 50 1.001 29.910 443.043 MNEMONIC SlGM TNG GR TNB~ TRAT $IGM 'lNG TNBK TRA~I SIGM TNG TNBK TRAT SlGM TNG GR TRA~ SIGM GR TNBK TRAT SIGM TNG TNBK TRA~ SlGM TNG TNBK TRAT SIGN TNG GR TNBtK TRAI~ SlGM TNG TNBK TRAT VALUE -999.000 -999.000 0.000 0.000 6.000 =0.015 936.579 199.900 493.127 1.002 21.258 942.821 28.550 304.674 2.435 18.981 929.838 17.700 172 19.970 932.085 23.500 315.296 2.b41 15.715 943.071 15.800 329.108 2.040 16.704 912.359 22.100 338.540 2.200 21.109 898.876 28.900 341.290 2.823 34.097 866.417 62.800 370.532 3.401 MN ENON1C FSIG TFG GRBU TFBK TMOD F$IG TFG GRBU TFB~ TMOD F$IG TFG GRBU TFBK TMOD F$IG TFG GRBU TFOK TMOO FSIG TFG GRBO TFBK TMOD f'$IG TFG GRBU TFBK TMOD f$IG TFG GRBU TFBK TNOD F$IG TFG GRBU TFBK TMOD FSIG TFG GRBU TFB~ TMOD VALUE -999.000 -999.000 0.250 0.000 0.002 -0.000 500.000 499.875 107.850 1.895 19.780 462.278 28.714 28.200 1.732 lb.109 455.034 18.227 26.850 1.732 16.139 456.283 23.471 30.700 1.732 13.037 460.530 14.482 30.500 1.732 13.726 445.416 21.973 35.100 1.732 18.297 433.800 29.089 38.250 1.732 32.712 442.b68 b3.920 51.100 1.001 · 7 D I:; P T 1-t 9600.000 9565,000 MN ENONIC TNB~ TRAT SIGN TNG GR TNBK T~AT TNG VALUE 0.350 0.000 6,000 59.955 0.749 -999.250 -999.250 -999.250 -999.250 -999.250 MN EMONIC GRBU TFBK FSIG TFG GRBU TFBK TMOD FSIG T~G VALUE 0.499 0.000 0.002 59.955 0.375 -999.250 -999.250 -999.250 -999.250 -999.250 MN kNONiC SIGN TNG GR TNBK TRAT 6IGN TNG TNBK TRA~~ VALUE 59.955 0.749 1.800 0.000 6.000 -999.250 -999.250 -999.250 -999.250 -999.250 MNEMONIC F$1G TFG GRBO TFBK TMOD F$IG TFG GRBU TFBK TMOD VALUE 59.955 0.375 2.247 0.000 O.002 -999.250 -999.250 -999.250 -999.250 -999.250 SUMMARY DP' DATA RECORDS NUMBEH OF RECORDS: 143 LgNG~H OF RECORDS: 1014 BYTES LENGTH OF' LAST RECORO: 594 BY~E8 ~ILE ~IRAILE~ LENGTH: 62 BYTES FILE NAME: EDiT .002 MAXIMUM PHYSICAL RECO~D LENGTH: NEXT ~ILE NAME: 1024 BYTES EOF FiLE HEADER LENGTH: 62 BYTES FILE NAME: ED1T .00] MAXIMUM PHYSICAL RECORD LENGTH: PREVIOUS FILE NAME: FiLE COMMENTS PASS ~'ODR AND FIVE 1024 BYTES W~]LL SITE IN~'DRMATIO~ RECORD LENGTH: COMPANY: WELL: ~IELD: RANGE: TOWN: SECTION: C[~UNTY: STATE: 178 B~TES SOHIO ALASKA PETRO. CO. X-2 PRUDHGg BAY 14E iON 14E N. SE, OPE ALASKA DATA ~'OBMA~I SPE¢IFI(]ATIUN I.,ENGI it: 850 ENTR~ BLUCK,S: IYPE 0 SIZE REP CUDE ENTR~ DATUM 5PECi~'ICAIION ~bUCKS: ENTRY lC TOOL S¥ORD# ! DEPT 2 GR IDTM G~BU IDTM $1GM TDTM 5 ~SIG IDTM TN~K IDTM 7 T~B~ TDTM 8 TNG TDTM 9 T~G IDTM 10 TRAI IDTM 11 TMOD TDTM 12 G~ %DTM GRBU ~DTM 14 SIGM TDTM 15 PSIG /DTM 16 TNBK IDTM 17 T~8~ IDTM 1,8 TNG IDTM 19 TPG IDIM 20 T~AI IDTM 21 TMOD ~DTM UNITS APl APl APl API FILE# SIZE EXP PROC SAM REP DEPT SBiF~ FT 0 0 0 0 0 4 0 0 i 68 0 0 GAPI 51 31 32 0 0 4 0 0 1 68 0 0 GAPt 51 31 32 0 0 4 0 0 1 68 0 0 CU 51 40 1 0 0 4 0 0 i 68 0 0 CU 51 40 2 0 0 ~ 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 C/C 51 42 0 0 0 4 0 0 I 68 0 0 51 43 0 0 0 4 0 0 I 68 0 0 GAPI 51 31 32 0 0 4 0 0 1' 68 0 0 GAPI 51 31 32 0 0 4 0 0 1 68 0 0 CU 51 40 I 0 0 4 0 0 1 68 0 0 CU 51 40 2 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 I 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 CPS 51 39 99 0 0 4 0 0 1 68 0 0 CPS 5~ 39 99 0 0 4 0 0 I 68 0 0 C/C 51 42 0 0 0 4 0 0 I 68 0 0 51 43 0 0 0 4 0 0 1 OB 0 0 DLPTH 10420,000 10400.000 10~00,000 10200.000 10100,000 10000o000 9900.000 9800.000 9700,000 NN EMON lC GP TNBK TRAT $IGM TNG TNB~ TRA~ SIGM TNG GR TNBK TRAT SIGM TNG GR TNBK TRAT SiGN TNG GR TNBg TRAT SIGM TNG GR TNBK TRAT SIGN TNG GR TRAT $IGM TNG GR TNBK TEAT SIGN TNG GR TNBK TRA~ SIGN TNG VALUE -999.000 -999.000 -999.000 59.955 0.749 199.900 499.625 1.004 -0.015 1000.000 29.050 341.665 2.495 22.592 928.339 21.550 352.037 2.380 18.532 926.841 24.400 351.287 2,568 19.670 931,336 20.600 357.536 1.947 16.120 931.336 25.100 368.408 2.255 15.925 933.833 33.900 362.909 2.600 20.989 904.619 07.100 403.649 3.484 33.963 858.926 MN EMONiC GRBU TFBK TMOD FSIG TFG GRBO TFBK TMOD FSIG TFG GRBU TFBK TMOD F$IG TFG GRBb TFBK TMOD FSiG TFG GRBU TFBK TMOD ~S1G TFG GRBU TFBK TMOD ~SIG TFG GRBO TFBK TMOD ~SIG TFG GRBU TFBK TMOD F$IG TFG GRBU TFBK TNOD ~SIG TFG VALUE -999.000 -999.000 -999.000 59.955 0.375 499.875 106.900 1.795 -0.000 500.000 29.089 33.650 1.732 20.215 454.659 20.474 31.300 1.732 16.289 447.040 25.968 32.000 1.732 16 888 452~286 20,474 34,600 1.733 .413 24,969 39,700 1.733 14,610 454,784 33.958 44,000 1.732 17.428 441.169 67.166 50.500 1.001 33.252 434.049 MN kMON lC ~IGN ~NG GR TNBK TRAT SIGN TNG GR TNBK TRA~ SIGN TNG TNBK TRAT SIGN TNG GR TNB~_ TRAT SIGN TNG G~ TNBK TRAT SIGN TNG GR TNBK TRAT SIGN TNG G~ TNB~ TRAT SIGN TNG GR TNBi< TRAT SiGN TNG GR TNBK TRAT VALUE -999.000 -999.000 0.000 0.000 6.000 0.000 979.026 20O.0O0 500.000 1.035 22.757 931,835 31.100 355.411 2.271 18.112 933.833 26,300 318 19.461 938.077 25.750 376.906 2.525 15,910 936,579 22,250 380.655 2.118 16.120 929,838 26,100' 381,780 2.181 20,989 902,122 34,950 384,404 2.603 34.502 856.180 68.650 404.524 3.728 NN EMONIC FSIG TFG GRBU TFBK TMOD FSiG TFG GRBO TFBK TMOO FSIG TFG GRBO TFB~ TMUD FSiG TFG GRBU TFBK TMOD F$IG TFG GRBO TFBK TMOD FSIG TFG GRBU TF8~ TMOD FSIG TFG TFBK TMOD FS1G TFG GRBO TFBK TMOD FSIG TFG GRBU TFBK TMOD VALUE -999.000 -999.000 0.250 0.000 0.002 0.015 500.000 499.875 174.000 3.495 20.155 457.407 31.211 32.400 1.733 15.599 456.408 26.092 32.450 1.733 lb.633 455.034 27.466 32.300 1.733 13.292 450.787 22.222 35,350 1.733 14.085 449.538 25.968 42.100 1.732 18.566 445.041 34.831 40.000 1.733 32.383 430.173 67.790 52.450 1.00i 9600.000 9565.000 EMONiC GR TNBK 6IGM TNG GR ~'NBK TRAT SiGM ~NG VALUE 0.500 0.000 6.000 40.105 856.429 -999.250 -999.250 -999.250 -999.250 -999.250 EMONIC GRBU TFBK TMOD T~G GRBU TMOD f'$IG TFG VALUE 0.749 0.000 0.002 39.725 443.168 -999.250 -999.250 -999.250 -999.250 -999.250 MNEMONIC 81GM TNG G~ TNBK TRAT 61GM TNG TNBK TRAT VALUE 59.940 0.749 70.500 400.275 4.473 -999.250 -99~.250 -99 .250 -999.250 -999.250 MN EMONIC E$IG TFG GRBU TFBK TMOD FSIG TFG GRBU TFBK TMOD VALUE 59.955 0.]75 70.412 51.650 1..001 -999.250 -999.250 -999.250 -999.250 -999.250 , /0- DATA RLC'U~D$ NIIMBE~ O~ RECORDS: 143 LENG'IH 0~" RECORDS: 1014 B~TES L~,NGTH {3~' LA6I' RECURD: 594 BYTES FILE TRAILEB I~ENGTH: ~2 BYTES FiLE NAME: EDiT .00] MAXIMUM PHYSICAL RECORD NEXT ~].LE NAME: LENGTH: 1024 BYTES TAP~ IjENGTH: 1~2 BYTES TAPE NAME: 60436 SE~VICE NAME: EDIT TAPE CONTINUATION NUMBE~: Ol NEXT ~APE NAME: COMMENTS: UNIQUE ~ELL IDENTIFICATION DATE: NUMBER 80/ 9/25 iS 50-029-20]97 * ALASKA COMPUTING CENTER * . . .~******~*********~*****~***** * ............................ . . ....... SCHLUMBERGER . ............................ . COMPANY NAME : BP EXPLORATION WELL NAME : X-02 FIELD NAME : PRUDHOE BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-20397-00 REFERENCE NO : 97423 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 1 **** RRRL HEADER **** SERVICE NAME : EDIT DATE : 97/11/25 ORIGIN : FLIC REEL NAME : 97423 CONTINUATION # : PREVIOUS REEL : COMFIEN"r : BP EXPLORATION, X-02, PRUDHOE BAY, 50-029-20397-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/11/25 ORIGIN : FLIC TAPE NAMIE : 97423 CONTINUATION # : 1 PREVIOUS TAPE : CO~VlENT : BP EXPLORATION, X-02, PRUDHOE BAY, 50-029-20397-00 TAPE HEADER PRUDHOE CASED HOLE WIRELINE LOGS WELL NAME: X- 02 API NUMBER: 500292039700 OPERATOR: BP Exploration LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 25 -NOV- 97 JOB NUMBER: 97423 LOGGING ENGINEER: D PAL~ER OPERATOR WITNESS: BARRY LUECKE SURFACE LOCATION SECTION: 8 TOWNSHIP: 1 ON RANGE: 14 E FNL : 296 FSL : FEL: FWL : 383 ELEVATION(FT FROM MSL O) KELLY BUSHING: 67.91 DERRICK FLOOR: 67.91 GROUND LEVEL: 39.51 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) IST STRING 8.500 7. 000 10452.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: SChLUMbERGER WELL SERVICES BASELINE DEPTH 88888.0 9903.5 9892.5 9890.0 9886.0 9881.5 9867.5 9860.5 9852.5 9852.0 9846.5 9841.5 9839.0 9835.5 9834.0 9820.5 9820.0 9812.5 9809.0 9795.5 9793.5 9786.5 9782.5 9765.5 9762.5 9760.5 9756.5 9752.0 9748.0 9744.5 9735.0 9725.0 9722.0 9716.5 9715.5 9713.0 9707.0 9690.5 9686.0 9682.5 9682.0 9678.0 9655.5 9654.5 9653.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRC~ TDTP .............. 88887.0 88887.5 9903.0 9891.5 9889.0 9884.5 9881.5 9867.0 9859.5 9851.5 9851.5 9846.0 9841.0 9838.0 9834.5 9833.5 9819.5 9819.5 9812.0 9808.0 9795.0 9791.5 9786.0 9781.0 9765.5 9761.0 9760.5 9755.5 9751.0 9747.0 9743.0 9735.0 9724.0 9721.5 9716.0 9715.5 9712.5 9706.5 9689.5 9686.0 9682.0 9681.5 9677.5 9678 . 5 9655.5 9655.0 9653.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-199? 10:50 9652.5 9653.0 9650.0 9650.5 9648.0 9649.0 9641.5 9641.0 9632.0 9631.5 9631.5 9632.0 9606.5 9608.5 9604.5 9604.0 9598.0 9599.5 100.0 101.5 99.5 $ CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE TDTP DATA ACQUIRED ON BP EXPLORATION'S X-02 WELL. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GR, ALSO SIGM PASS #1 AND THE BCS GR CARRYING ALL TDTP CURVES WITH THE SIGM SHIFTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: I DEPTH INCREFIENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9903.0 9580.0 TDTP 9928.0 9602.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS--ER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: Rb~4ARKS: THIS FILE CONTAINS CASED HOLE TDTP SHUTIN PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 1023880 00 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 SB~iN TDTP CU 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 1023880 O0 000 O0 0 1 I 1 4 68 0000000000 TRAT TDTP 1023880 O0 000 O0 0 1 1 I 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 1 I 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: NA~E SERV UNIT SERVICE API API API API FILE NUFIB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP EL4~4 CODE (HEX) TSCF TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 GRCHTDTP GAPI 1023880 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 00 0 1 1 I 4 68 0000000000 CCL TDTP V 1023880 00 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9927.500 SIGM. TDTP 13.871 TPHI. TDTP 23.809 SBHF. TDTP SBHN. TDTP 46.654 SIGC. TDTP 0.694 SIBH. TDTP 50.833 TRAT. TDTP SDSI. TDTP 0.232 BACK. TDTP 121.618 FBAC. TDTP 127.808 TCAN. TDTP TCAF. TDTP 34460.813 TCND. TDTP 25587.684 TCFD. TDTP 8864.699 TSCN. TDTP TSCF. TDTP 3405.032 INND. TDTP 1996.245 INFD. TDTP 444.298 GRCH. TDTP TENS. TDTP 1909.000 CCL.TDTP 0.000 DEPT. 9581.500 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP TENS. TDTP -999.250 CCL.TDTP -999.250 39. 761 1. 710 77680. 813 7675. 550 -999. 250 -999.250 -999.250 -999.250 -999.250 62.013 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .00i SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: FILE HEADER FILE NUMBER: 2 ~DIT~D CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH IN~: 0.5000 FILE SUMM3kRY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9899.0 9576.0 TDTP 9922.0 9607.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASUREDDEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88888.0 88888.5 9905.0 9905.5 9891.5 9891.5 9888.5 9888.5 9886.5 9886.5 9881.0 9881.5 9864.5 9865.0 9851.5 9851.5 9852.0 9848.0 9848.5 9846.0 9846.5 9841.0 9841.0 9841.0 9834.0 9834.0 9829.5 9829.5 9820.0 9820.0 9811.5 9811.5 9799.0 9799.0 9796.0 9797.0 9795.0 9794.0 9786.0 9785.5 9786.0 9774.5 9775.0 9765.0 9765.5 9764.5 9764.0 9761.5 9761.0 9760°5 9761.5 9751.0 9751.0 9747.5 9747.0 9744.0 9743.5 9736.5 9736.5 9737.0 9727.5 9728.0 9724.0 9724.0 9721.5 9722.0 9721.0 9721.0 9715.5 9716.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 9710.0 9710.0 9708.0 9708.0 9706.0 9706.5 9703.0 9703.5 9686.0 9685.5 9685.5 9686.0 9682.0 9682.5 9677.5 9677.5 9677.0 9678.0 9654.5 9655.0 9654.0 9655.5 9652.0 9653.0 9649.5 9650.5 9648.0 9649.5 9631.0 9632.0 9628.0 9628.0 9610.5 9610.5 9602.0 9603.0 100.0 101.0 100.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP SHUTIN PASS #2. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCHPASS #1, ALSO SIGM PASS #2 AND SIGM PASS #1CARRYINGALL TDTP CURVES WITH THE SIGM SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFI~ SAMP ELE~ CODE (HEX) DEPT FT 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 SIGMTDTP CU 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 SBHFTDTP CU 1023880 O0 000 O0 0 2 1 i 4 68 0000000000 SBHN TDTP CU 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 SIGCTDTP CU 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 1023880 O0 000 O0 0 2 I 1 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 1023880 O0 000 O0 0 2 1 I 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 1023880 O0 000 O0 0 2 1 1 ~ 68 0000000000 ** DATA ** DEPT. 9922.500 SIGM. TDTP 14.499 TPHI. TDTP 19.453 SBHF. TDTP SBHN. TDTP 46.531 SIGC. TDTP 1.574 SIBH. TDTP 50.157 TRAT. TDTP SDSI. TDTP 0.593 BACK. TDTP 138.806 FBAC. TDTP 68.328 TCAN. TDTP TCAF. TDTP 12121.943 TCND. TDTP 8248.979 TCFD. TDTP 2989.876 TSCN. TDTP TSCF. TDTP 1207.346 INND. TDTP 564.033 INFD. TDTP 124.588 GRCH. TDTP TENS. TDTP 1859.000 CCL. TDTP 0.000 DEPT. 9577.000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP TENS. TDTP -999.250 CCL. TDTP -999.250 36.609 1.554 24840.523 2474.117 -999.250 -999.250 -999.250 -999.250 -999.250 61.401 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: **** FILE TRAILER **** FILE NAMIE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUF~VlARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9899.0 9582.0 TDTP 9922.0 9614.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9919.5 9905.5 9889.0 9882.5 9881.0 9879.5 9864.5 9851.5 9847.5 9846.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP 88888.0 88889.0 9889.0 9882.5 9880.0 9865.0 9851.5 9846.5 9920.5 9906.0 9889.0 9881.5 9851.5 9848.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 10 9841.0 9841.0 9841.0 9834.0 9834.0 9830.0 9830.0 9823.0 9822.0 9811.5 9811.5 9797.0 9797.0 9795.5 9794.5 9794.5 9795.0 9788.5 9789.0 9786.0 9786.0 9785.5 9786.0 9772.0 9772.5 9765.0 9765.5 9761.5 9761.0 9760.5 9761.0 9751.0 9751.0 9747.5 9747.0 9736.5 9736.5 9728.0 9728.5 9724.0 9724.0 9722.5 9723.5 9721.0 9721.5 9720.5 9720.5 9716.0 9716.0 9712.5 9712.5 9708.0 9707.5 9703.0 9703.0 9702.5 9693.5 9694.0 9690.0 9689.5 9685.5 9685.5 9685.0 9685.5 9682.0 9682.5 9681.0 9681 . 0 9677.5 9677.5 9677.0 9678.5 9673.5 9675.0 9654.5 9655.0 9652.0 9653.0 9651.5 9653.0 9649.5 9650.5 9648.0 9649.0 9643.5 9643.0 9631.0 9632.0 9606.0 9609.0 9602.5 9604.5 100.0 102.0 99.5 $ THIS FILE CONTAINS CASED HOLE TDTP SHUTIN PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO SIGM PASS #3 AND SIGM PASS #1 CARRYING ALL TDTP CURVES WITH THE SIGM SHIFTS. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 11 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 SIGMTDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 3 1 I 4 68 0000000000 SBHF TDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 SBI-INTDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TRATTDTP 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TSCNTDTP CPS 1023880 O0 000 00 0 3 1 1 4 68 0000000000 TSCFTDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 GRCHTDTP GAPI 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 12 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUmB SIZE REPR PROCESS ID ORDER # LOG 2'TPE CI.d~S MOD ~ S~vlP ELI~ CODE CCL TDTP V 1023880 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9923.000 SIGM. TDTP 13.137 TPHI. TDTP 18.353 SBHF. TDTP SBHN. TDTP 43.371 SIGC. TDTP 2.072 SIBH. TDTP 44.161 TRAT. TDTP SDSI. TDTP 0.557 BACK. TDTP 122.560 FBAC. TDTP 66.908 TCAN. TDTP TCAF. TDTP 11940.705 TCND. TDTP 8151.500 TCFD. TDTP 2955.701 TSCN. TDTP TSCF. TDTP 1177.101 INND. TDTP 564.726 INFD. TDTP 125.842 GRCH. TDTP TENS. TDTP 1850.000 CCL.TDTP 0.000 37. 810 1. 585 25157. 582 2480. 006 - 999. 250 DEPT. 9584.000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND.TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 65.389 TENS. TDTP -999.250 CCL. TDTP -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 13 PASS NUMBER: 4 DEPTH IN~: 0. 5000 FILE SUF~A~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9888.0 9580 . 0 TDTP 9912.0 9614.0 $ CURVE SHIFT DATA - PASS TO PASS (MF~S~ DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9903.5 9890.0 9883.0 9882.5 9876.0 9860.5 9852.5 9852.0 9848.5 9847.0 9846.5 9841.5 9835.0 9834.0 9812.5 9809.0 9803.5 9797.0 9796.0 9789.5 9788.5 9786.5 9773.0 9766.5 9766.0 9762.5 9761.0 9752.0 9748.5 9744.5 9737.5 9737.0 9731.5 9725.0 9722.0 9721.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH TDTP .............. 88887.0 88887.5 9903.0 9889.0 9882.0 9881.5 9876.0 9859.5 9851.5 9851.5 9848.0 9846.0 9846.0 9841.0 9841.0 9834.5 9833.5 9812.0 9809.0 9803.0 9797.0 9794.5 9789.0 9786.5 9786.5 9772.5 9765.0 9765.5 9761.0 9761.0 9751.0 9747.5 9743.0 9736.5 9736.5 9731.0 9724.0 9722.0 9720.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 14 9713.5 9712.5 9711.0 9710.5 9709.0 9708.0 9707.0 9706.5 9704.0 9702.5 9697.5 9697.0 9686.5 9686.0 9683.0 9682.5 9682.0 9681.5 9678.5 9677.5 9678.5 9659.0 9659.0 9655.0 9655.5 9654.5 9655.0 9653.0 9653.0 9650.5 9650.5 9645.0 9644.5 9640.5 9641.5 9638.0 9640.0 9617.0 9619.0 100.0 102.0 101.0 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP FLOWING PASS #1. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #4 AND GRCH PASS #1, ALSO SIGM PASS #4 AND SIGM PASS #1 CARRYING ALL TDTP CURVES WITH THE SIGM SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-i997 10:50 PAGE: 15 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUFIB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SIGMTDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SBHFTDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SBHN TDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC TDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SIBHTDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT TDTP 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF TDTP CPS 1023880 O0 000 O0 0 4 1 i 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TSCNTDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH TDTP GAPI 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 CCL TDTP V 1023880 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 9911.500 SIGM. TDTP 13.816 TPHI. TDTP 23.647 SBHF. TDTP 30.539 SBHN. TDTP 46.149 SIGC. TDTP 0.952 SIBH. TDTP 49.708 TRAT. TDTP 1.712 SDSI. TDTP 0.257 BACK. TDTP 69°593 FBAC. TDTP 81.799 TCAN. TDTP 69444.594 TCAF. TDTP 31104.496 TCND. TDTP 27819.188 TCFD. TDTP 9701.754 TSCN. TDTP 8599.949 TSCF. TDTP 3851.950 INND. TDTP 2022.155 INFD. TDTP 437.498 GRCH. TDTP -999.250 TENS. TDTP 1545.000 CCL.TDTP 0.000 DEPT. 9582.000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP -999.250 SBI~N. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 149.741 TENS. TDTP -999.250 CCL.TDTP -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 16 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 5 DEPTH INCRb~4ENT: 0.5000 FILE SUF~fARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9902.0 9588.0 TDTP 9927.0 9620.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9906.0 9903.0 9890.0 9889.0 9887.0 9882.5 9876.0 9864.5 9852.0 9848.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP .............. 88888.0 88888.0 9906.0 9903.0 9889.0 9889.0 9882.5 9865.0 9851.5 9886.5 9876.5 9852.0 9848.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 17 9847.0 9846.0 9841.5 9841.0 9841.5 9837.5 9837.5 9833.5 9833.5 9820.5 9820.0 9811.5 9812.0 9810.0 9809.0 9807.0 9807.0 9797.0 9797.0 9796.0 9794.5 9789.5 9789.5 9766.5 9765.0 9765.5 9765.5 9762.0 9761.0 9760.0 9761.0 9758.5 9758.0 9756.5 9756.0 9751.5 9750.5 9747.5 9747.0 9730.5 9729.5 9728.0 9728.5 9724.5 9724.0 9723.5 9723.0 9716.5 9716.0 9715.5 9716.0 9713.0 9712.5 9709.5 9709.0 9708.5 9708.0 9697.0 9697.0 9686.0 9685.5 9682.0 9682.5 9678.5 9679.0 9678.0 9677.5 9674.5 9674.0 9661.0 9661.0 9655.0 9655.0 9654.0 9655.0 9653.0 9653.0 9650.0 9650.5 9644.0 9645.0 9599.5 9601 . 0 100.0 101.5 101.0 $ RE~2~KS: THIS FILE CONTAINS CASED HOLE TDTP FLOWING PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #SAND GRCH PASS #1, ALSO SIGM PASS #5 AND SIGM PASS #I CARRYING ALL TDTP CURVES WITH THE SIGM SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 18 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 0 0 88 1 66 66 73 66 66 73 65 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 0 68 0.5 65 FT 66 11 68 66 0 65 FT 66 68 66 1 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 5 1 1 4 68 0000000000 DEPT FT 1023880 SIGM TDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 SBHFTDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 SBUN TDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC TDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH TDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT TDTP 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TCAN TDTP CPS 1023880 O0 000 O0 0 5 I 1 4 68 0000000000 TCAF TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 5 i 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TSCNTDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 5 I 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 GRCH TDTP GAPI 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 CCL TDTP V 1023880 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 19 ** DATA ** DEPT. 9927.000 SIGM. TDTP 13.565 TPHI. TDTP 19.307 SBHF. TDTP SBHN. TDTP 46.172 SIGC. TDTP 1.113 SIBH. TDTP 49.422 TRAT. TDTP SDSI. TDTP 0.477 BACK. TDTP 127.228 FBAC. TDTP 59.910 TCAN. TDTP TCAF. TDTP 13367.432 TCND. TDTP 8654.215 TCFD. TDTP 3211.334 TSCN. TDTP TSCF. TDTP 1324.992 INND. TDTP 583.042 INFD. TDTP 142.377 GRCH. TDTP TENS. TDTP 1455.000 CCL. TDTP 0.000 DEPT. 9589.500 SIGM. TDTP -999.250 TPHI. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP TENS. TDTP -999.250 CCL.TDTP -999.250 -999.250 SBHF. TDTP -999.250 TRAT. TDTP -999.250 TCAN. TDTP -999.250 TSCN. TDTP -999.250 GRCH. TDTP 38. 915 1.578 27403.164 2716.226 -999.250 -999.250 -999.250 -999.250 -999.250 100.310 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 6 DEPTH INCRESIENT: 0.5000 FILE SUF~IARY LDWG TOOL CODE START DEPTH GRCH 9898.0 TDTP 9922.0 STOP DEPTH 9584.0 9615.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 20 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUM~ER: 1 BASELINE DEPTH 88888.0 9916.5 9905.5 9894.5 9889.5 9889.0 9881.0 9875.0 9864.5 9851.5 9848.0 9846.5 9846.0 9843.5 )841.0 )834.0 )833.0 9825.0 9811.0 9805.5 9794.5 9787.0 9777.0 9776.5 9765.0 9764.5 9761.5 9760.0 9751.5 9747.5 9734.0 9727.5 9724.0 9721.5 9721.0 9716.0 9714.0 9712.5 9708.5 9706.0 9697.0 9688.0 9685.5 9685.0 9682.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88888.0 88889.0 9894.5 9889.0 9865,0 9851.5 9846, 5 9841.0 9834.0 9825.5 9806.5 9786,0 9774,5 9763,5 9761,0 9747.0 9724.0 9720,5 9716.0 9712.5 9706.5 9685.5 9917.5 9906.0 9889.0 9881.5 9876.0 9851.5 9848.5 9846.5 9843.5 9841.0 9833.5 9811.5 9795.0 9777.0 9765.5 9761.0 9751.0 9734.5 9728.0 9721.5 9714.5 9708.0 9697.0 9690.0 9685.5 9682.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 21 9678.0 9677.5 9676.5 9678.0 9654.5 9655.0 9652.5 9653.0 9651.5 9653.0 9649.5 9650.5 9647.5 9649.0 9639.5 9641.0 9630.5 9632.0 9617.5 9619.0 9606.0 9608.5 9599.0 9601.0 9597.0 9599.5 100.0 102.5 101.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE TDTP FLOWING PASS #3. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #6 AND GRCH PASS #1, ALSO SIGM PASS #6AND SIGM PASS #1 CARRYING ALL TDTP CURVES WITH THE SIGM SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 22 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUbI~ SAMP EL~4 CODE (HEX) DEPT FT 1023880 O0 000 00 0 6 1 1 4 68 0000000000 SIGM TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TPHI TDTP PU-S 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 SBHF TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 SBHN TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 SIGC TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 SIBH TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TRAT TDTP 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 SDSI TDTP CU 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TCANTDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TCAFTDTP CPS 1023880 O0 000 00 0 6 1 1 4 68 0000000000 TCND TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TSCN TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TSCF TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 INND TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 INFD TDTP CPS 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 GRCH TDTP GAPI 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 TENS TDTP LB 1023880 O0 000 O0 0 6 1 1 4 68 0000000000 CCL TDTP V 1023880 O0 000 00 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9923.000 SIGM. TDTP 14.493 TPHI. TDTP 22.209 SBHF. TDTP SBHI~.TDTP 44.829 SIGC. TDTP 0.659 SIBH. TDTP 47.137 TRAT. TDTP SDSI. TDTP 0.470 BACK. TDTP 114.543 FBAC. TDTP 54.879 TCAN. TDTP TCAF. TDTP 12353.045 TCND. TDTP 8310.627 TCFD. TDTP 3069.886 TSCN. TDTP TSCFoTDTP 1236.100 INND. TDTP 582.577 INFD. TDTP 134.457 GRCH. TDTP TENS. TDTP 1433.000 CCL. TDTP 0.000 34.824 1.661 26836.313 2685.360 -999.250 DEPT. 9586.500 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 103.240 TENS. TDTP -999.250 CCL. TDTP -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 23 **** FILE TRAILER **** FILE NAFIE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~ : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, TDTP THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF CASED HOLE TDTP SHUTIN PASSES 1,2, & 3. ALL 3 PASSES WERE CLIPPED OF INVALID DATA AND DEPTH CORRECTED PRIOR TO AVERAGING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 80 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 24 TYPE REPR CODE VALUE .............................. 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 .............................. ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SIGM PNAV CU 1023880 O0 000 O0 0 7 t 1 4 68 0000000000 TPHI PNAV PU-S 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SBHF PNAV CU 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SBHNPNAV CU 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SIGC PNAV CU 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH PNAV CU 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT PNAV 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 SDSI PNAV CU 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 BACK TDTP CPS 1023880 O0 000 O0 0 ? 1 1 4 68 0000000000 FBAC TDTP CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TCANPNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TCAFPNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TCNDPNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TCFD PNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TSCN PNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 TSCF PNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 INNDPNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 INFD PNAV CPS 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 GRCH TDTP GAPI 1023880 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 9927. 500 SIGM. PNAV -999. 250 TPHI. PNAV SBHN. PNAV -999. 250 SIGC. PNAV -999. 250 SIBH. PNAV SDSI. PNAV -999. 250 BACK. TDTP 121.618 FBAC. TDTP TCAF. PNAV -999. 250 TCND. PNAV -999. 250 TCFD. PNAV TSCF. PNAV -999.250 INND.PNAV -999.250 INFD.PNAV -999.250 SBHF. PNAV -999.250 TRAT. PNAV 127.808 TCAN. PNAV -999.250 TSCN. PNAV -999.250 GRCH. TDTP - 999. 250 - 999.250 - 999.250 - 999.250 - 999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 25 DEPT. 9581.500 SIGM. PNAV -999.250 TPHI.PNAV -999.250 SBHF. PNAV -999.250 SBHN. PNAV -999.250 SIGC. PNAV -999.250 SIBH. PNAV -999.250 TRAT. PNAV -999.250 SDSI.PNAV -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. PNAV -999.250 TCAF. PNAV -999.250 TCND. PNAV -999.250 TCFD.PNAV -999.250 TSCN. PNAV -999.250 TSCF. PNAV -999.250 INND.PNAV -999.250 INFD.PNAV -999.250 GRCH. TDTP 62.013 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUFIBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREFIENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ........................... TDTP 9863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~E LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 9600.0 9-JUL-97 8C0- 609 1700 9-JUL-97 993 O. 0 9927.0 9576.0 9928.0 900.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-I997 10:50 PAGE: 26 DEPTH CONTROL USED (YES/NO) : NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAMMA RAY TDTP PULSED NEUTRON $ TOOL NIIM~ER CGRS-A TDI C-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 8.500 10452.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TI~4PERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS (80% 8.34 220.0 NEUTRON TOOL TOOL TYPE (EPITH~ OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH CORRELATED TO CEMENT BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 lw2~POD. NOR 2.02, NET WATER RATE 7.55 MBPOD. FORMATION GAS 11.91 ~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8%. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW SHUTIN PASS #1. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 27 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) ....................................................................................... DEPT FT 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SIGM PS1 CU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TPHI PS1 PU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SBHF PS1 CU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SBHNPS1 CU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SIGC PS1 CU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SIBH PS1 CU 1023880 O0 000 O0 0 8 I 1 4 68 0000000000 TRAT PS1 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 SDSI PS1 CU 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 BACK PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 FBAC PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TCANPS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TCAFPS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TCND PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 ~ TCFD PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TSCNPS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TSCF PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 INNDPS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 INFD PS1 CPS 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 TENS PS1 LB 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 28 NAME SERV UNIT SERVICE API API API API FILE ~ NUFI~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELI~ CODE (HEX) GR PS1 GAPI 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 CCL PS1 V 1023880 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 9936.000 SIGM. PS1 -999.250 TPHI.PS1 -999.250 SBHF. PS1 SBHN. PS1 -999.250 SIGC. PS1 -999.250 SIBH. PS1 -999.250 TRAT. PS1 SDSI.PS1 -999.250 BACK. PSI -999.250 FBAC. PS1 -999.250 TCAN. PS1 TCAF. PS1 -999.250 TCND.PS1 -999.250 TCFD.PS1 -999.250 TSCN. PS1 TSCF. PS1 -999.250 INND. PS1 -999.250 INFD.PS1 -999.250 TENS.PSi GR.PS1 325.455 CCL.PS1 0.029 DEPT. 9553.000 SIGM. PS1 44.642 TPHI.PS1 69.787 SBHF. PS1 SBHN. PS1 56.116 SIGC. PS1 0.000 SIBH. PS1 73.491 TRAT. PS1 SDSI.PS1 0.832 BACK. PSI 125.674 FBAC. PS1 26.966 TCAIV. PS1 TCAF. PS1 11347.350 TCND.PS1 14047.738 TCFD. PS1 3562.444 TSCN. PS1 TSCF. PS1 347.066 INlVD. PS1 1759.338 INFD.PS1 328.931 TENS.PSi GR.PS1 64.324 CCL.PS1 -999.250 -999.250 -999.250 -999.250 -999.250 1515.000 52.207 1.810 43446.492 1317.008 1905.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUM~ER RAW CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 29 Curves and log header data for each pass in separate files; raw background pass in last file PASS NU~BER: 2 DEPTH IN~: 0.5000 FILE SD?4F~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9863.0 9600.0 TDTP LOG HEADER DATA DATE LOGGED: 9-JUL-97 SOFTWARE VERSION: 8C0- 609 TIF1E LOGGER ON BOTTOM: 1700 9-JUL-97 TD DRILLER (FT) : 9930.0 TD LOGGER (FT) : 9927.0 TOP LOG INTERVAL (FT) : 9576.0 BOTTOM LOG INTERVAL (FT) : 9928.0 LOGGING SPEED (FPHR) : 900.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAM~A RAY TDTP PULSED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN).: DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL NUMBER CGRS-A TDIC-A 8.500 10452.0 PRODUCED FLUIDS (80~ 8.34 220.0 THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 30 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 RE~IAR3Cg: DEPTH CORRELATED TO CE~IENT BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 M~POD. NOR 2.02, NET WATER RATE 7.55 MBPOD. FORMATION GAS 11.91 M~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8~. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW SHUTIN PASS #2. LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 31 ** SET TYPE - CHAN ** NAFIE SERV UNIT SERVICE API API API API FILE NUMB NUF~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) O0 000 O0 0 9 1 1 4 68 0000000000 DEPT FT 1023880 SIGMPS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TPHI PS2 PU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 SBHF PS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 SBHNPS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 SIGC PS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 SIBH PS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TRAT PS2 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 SDSI PS2 CU 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 BACK PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 FBAC PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TCANPS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TCAFPS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TCNDPS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TCFD PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TSCN PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TSCF PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 INND PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 INFD PS2 CPS 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 TENS PS2 LB 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 GR PS2 GAPI 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 CCL PS2 V 1023880 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 9931.000 SIGM. PS2 -999.250 TPHI. PS2 -999.250 SBHF. PS2 SBHN. PS2 -999.250 SIGC. PS2 -999.250 SIBH. PS2 -999.250 TRAT. PS2 SDSI. PS2 -999.250 BACK. PS2 -999.250 FBAC. PS2 -999.250 TCAN. PS2 TCAF. PS2 -999.250 TCND.PS2 -999.250 TCFD. PS2 -999.250 TSCN. PS2 TSCF. PS2 -999.250 INND. PS2 -999.250 INFD. PS2 -999.250 TENS.PS2 GR.PS2 81.364 CCL.PS2 0.019 DEPT. 9574.500 SIGM. PS2 43.858 TPHI.PS2 51.801 SBHF. PS2 SBHN. PS2 50.738 SIGC. PS2 1.288 SIBH. PS2 61.290 TRAT. PS2 SDSI.PS2 1.607 BACK. PS2 98.547 FBAC. PS2 25.307 TCAN. PS2 TCAF. PS2 4598.770 TCND. PS2 4805.563 TCFD.PS2 1251.344 TSCN. PS2 TSCF. PS2 129.502 INND.PS2 573.058 INFD.PS2 112.747 TENS.PS2 GR. PS2 67.918 CCL.PS2 -999.250 -999.250 -999.250 -999.250 -999.250 1352.000 46.053 1.597 16847.820 445.933 1876.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 32 **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 9863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP PULSED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : STOP DEPTH 9600.0 9-JUL-97 8C0- 609 1700 9-JUL-97 9930.0 9927.0 9576.0 9928.0 900.0 NO TOOL NUMBER CGRS-A TDIC-A 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 33 DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 10452.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS (80% 8.34 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REFIAPJfS: DEPTH CORRELATED TO CEMR~ BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 MBPOD. NOR 2.02, NET WATER RATE 7.55 MBPOD. FORMATION GAS 11.91 ~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8%. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW SHUTIN PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 34 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 SIGM PS3 CU 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TPHI PS3 PU 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 SBHF PS3 CU 1023880 O0 000 O0 0 I0 1 1 4 68 0000000000 SBHNPS3 CU 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 SIGC PS3 CU 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 SIBH PS3 CU 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TRAT PS3 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 SDSI PS3 CU 1023880 O0 000 O0 0 10 1 i 4 68 0000000000 BACK PS3 CPS 1023880 O0 000 O0 0 10 1 I 4 68 0000000000 FBAC PS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TCANPS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TCAFPS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TCNDPS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TCFD PS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TSCNPS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TSCF PS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 INNDPS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 INFD PS3 CPS 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 TENS PS3 LB 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 GR PS3 GAPI 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 CCL PS3 V 1023880 O0 000 O0 0 10 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 35 ** DATA ** DEPT. 9931.000 SIGM. PS3 SBHN. PS3 -999.250 SIGC. PS3 SDSI.PS3 -999.250 BACK. PS3 TCAF. PS3 -999.250 TCND.PS3 TSCF. PS3 -999.250 INND. PS3 GR.PS3 189.848 CCL.PS3 DEPT. 9580.500 SIGM. PS3 SB~N. PS3 55.064 SIGC. PS3 SDSI.PS3 1.554 BACK. PS3 TCAF. PS3 4349.981 TCND. PS3 TSCF. PS3 128.234 INND.PS3 GR.PS3 65.133 CCL.PS3 -999.250 TPHI.PS3 -999.250 SIBH. PS3 -999.250 FBAC. PS3 -999.250 TCFD.PS3 -999.250 INFD.PS3 0.029 44.450 TPHI.PS3 0.689 SIBH. PS3 92.067 FBAC. PS3 4740.484 TCFD.PS3 537.572 INFD.PS3 -999.250 -999.250 SBHF. PS3 -999.250 TRAT. PS3 -999.250 TCAN. PS3 -999.250 TSCN. PS3 -999.250 TENS.PS3 59.024 SBHF. PS3 71.105 TRAT. PS3 24.150 TCAN. PS3 1200.639 TSCN. PS3 117.290 TENS.PS3 -999.250 -999.250 -999.250 -999.250 1512.000 47.669 1.628 16479.242 441.563 1904.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE hT]FIBER I1 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... TDTP 9863.0 9600.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 36 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 9-JUL-97 8C0-609 1700 9-JUL-97 9930.0 9927.0 9576.0 9928.0 900.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY TDTP PULSED NEUTRON $ TOOL NUM~ER CGRS-A TDIC-A BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 10452.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~PERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS (80% 8.34 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH CORRELATED TO C~ BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 37 WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 MBPOD. NOR 2.02, NET WATER RATE 7.55 M~POD. FORMATION GAS 11.91 ~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8~. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW FLOWING PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELM CODE (HEX) DEPT FT 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 SIGM FL1 CU 1023880 O0 · 000 O0 0 1I t 1 4 68 0000000000 TPHI FL1 PU 1023880 O0 000 O0 0 I1 1 1 4 68 0000000000 SBHF FL1 CU 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 SBHNFL1 CU 1023880 O0 000 O0 0 I1 1 1 4 68 0000000000 SIGC FL1 CU 1023880 O0 000 O0 0 i1 1 1 4 68 0000000000 SIBH FL1 CU 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TRAT FL1 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 SDSI FL1 CU 1023880 O0 000 O0 0 11 1 i 4 68 0000000000 BACK FL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 38 NAM~ SERV UNIT SERVICE API API API API FILE NUFIB NUF~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUF~ SAMP ELE~ CODE (HEX) FBACFL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TCANFL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TCAFFL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TCND FL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TCFD FL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TSCN FL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TSCF FL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 INNDFL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 INFDFL1 CPS 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 TENS FL1 LB 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 GR FL1 GAPI 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 CCL FL1 V 1023880 O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. SBHN. FL1 SDSI.FL1 TCAF. FL1 TSCF. FL1 GR.FL1 9919.000 SIGM. FL1 -999.250 TPHI.FL1 -999.250 SBHF. FL1 -999.250 -999.250 SIGC.FL1 -999.250 SIBH. FL1 -999.250 TRAT. FL1 -999.250 -999.250 BACK. FL1 -999.250 FBAC. FL1 -999.250 TCAN. FL1 -999.250 -999°250 TCND. FL1 -999.250 TCFD.FL1 -999.250 TSCN. FL1 -999.250 -999.250 INND.FL1 -999.250 INFD.FL1 -999.250 TENS.FL1 1176.000 244.091 CCL.FL1 0.010 DEPT. 9580.000 SIGM. FL1 39.130 TPHI.FL1 41.368 SBHFoFL1 45.906 SBHI~.FL1 48.657 SIGC. FL1 0.000 SIBH. FL1 56.569 TRAT. FL1 1.518 SDSI.FL1 0.767 BACK. FL1 130.876 FBAC. FL1 43.297 TCAN. FL1 46761.063 TCAF. FL1 15942.412 TCND.FL1 18783.332 TCFD.FL1 6252.162 TSCN. FL1 2458.450 TSCF. FL1 849.752 INND.FL1 2237.409 INFD.FL1 624.454 TENS.FL1 1438.000 GR.FLI 149.741 CCL.FL1 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 39 **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUF1BER 12 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS ~ER : 5 DEPTH INCRESfENT: 0.5000 FILE SUF~ARY VENDOR TOOL CODE START DEPTH TDTP 9863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMF~A RAY TDTP PULSED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : STOP DEPTH .......... 9600.0 9-JUL-97 8C0-609 1700 9-JUL-97 9930.0 9927.0 9576.0 9928.0 900.0 NO TOOL NUMBER ........... CGRS-A TDIC-A 8.500 10452.0 PRODUCED FLUIDS (80~ 8.34 220.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-i997 10:50 PAGE: 40 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REFIARKS: DEPTH CORRELATED TO CEMENT BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 MBPOD. NOR 2.02, NET WATER RATE 7.55 MBPOD. FORMATION GAS 11.91 ~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8~. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW FLOWING PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 41 TYPE REPR CODE VALUE I1 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAI~IE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELi~I CODE (HEX) DEPT FT 1023880 O0 000 O0 0 12 1 t 4 68 0000000000 SIGM FL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TPHI FL2 PU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 SBHF FL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 SBHNFL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 SIGC FL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 SIBH FL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TRAT FL2 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 SDSI FL2 CU 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 BACK FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 FBAC FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TCANFL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TCAFFL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TCND FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TCFDFL2 CPS 1023880 O0 000 O0 0 12 I 1 4 68 0000000000 TSCN FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TSCF FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 INNDFL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 INFD FL2 CPS 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 TENS FL2 LB 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 GR FL2 GAPI 1023880 O0 000 O0 0 12 1 1 4 68 0000000000 CCL FL2 V 1023880 O0 000 O0 0 12 1 t 4 68 0000000000 ....................................................................................... ** DATA ** DEPT. 9935.000 SIGM. FL2 -999.250 TPHI.FL2 -999.250 SBHF. FL2 -999.250 SBHN. FL2 -999.250 SIGC. FL2 -999.250 SIBH. FL2 -999.250 TRAT. FL2 -999.250 SDSI.FL2 -999.250 BACK. FL2 -999.250 FBAC. FL2 -999.250 TCAN. FL2 -999.250 TCAF. FL2 -999.250 TCND.FL2 -999.250 TCFD.FL2 -999.250 TSCN. FL2 -999.250 TSCF. FL2 -999.250 INND.FL2 -999.250 INFD.FL2 -999.250 TENS. FL2 1023.000 GR.FL2 162.727 CCL.FL2 0.029 DEPT. 9586.500 SIGM. FL2 38.616 TPHI.FL2 49.351 SBHF. FL2 43.816 SBPiN. FL2 50.895 SIGC. FL2 0.000 SIBH. FL2 61.647 TRAT. FL2 1.609 SDSI.FL2 1.389 BACK. FL2 96.757 FBACoFL2 32.023 TCAN. FL2 17945.504 TCAF. FL2 5831.037 TCND.FL2 6618.943 TCFD.FL2 2130.957 TSCN. FL2 938.372 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-I997 10:50 PAGE: 42 TSCF. FL2 305.567 INND.FL2 GR.FL2 103.820 CCL.FL2 676.390 INFD.FL2 -999.250 198.832 TENS.FL2 1423.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 13 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH ........................... TDTP 9863.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO') TOOL STRING (TOP TO BOTTOM) STOP DEPTH 9600.0 9-JUL-97 8C0-609 1700 9-JUL-97 9930.0 9927.0 9576.0 9928.0 900.0 NO LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 43 VENDOR TOOL CODE TOOL TYPE TOOL GR GAMMA RAY CGRS-A TDTP PULSED NEUTRON TD I C- A $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (PT): 8.500 10452.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~PERATURE (DEGF) : BOTTOM HOLE T~PERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS (80~ 8.34 220.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: DEPTH CORRELATED TO CEMENT BOND LOG OF 23-NOV-1979 3 PASSES AT 900 FPH RECORDED FOR BOTH SHUT IN AND FLOWING WELL TEST DATA. FROM 06-28-97 GROSS FLUID RATE 9.56 MBPOD. NOR 2.02, NET WATER RATE 7.55 MBPOD. FORMATION GAS 11.91 ~SCFD. GOR 5909, CK 89.9, FWHP 381, FWT 182 DEGF. WATER CUT 78.8~. SHUTIN PRESSURE GAS LIFT OFF 1500 PSI. THIS FILE CONTAINS CASED HOLE TDTP RAW FLOWING PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 44 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~ CODE (HEX) ....................................................................................... DEPT FT 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 SIGM FL3 CU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TPHI FL3 PU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 SBHF FL3 CU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 SBHNFL3 CU 1023880 O0 000 O0 0 13 i 1 4 68 0000000000 SIGC FL3 CU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 SIBH FL3 CU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TRAT FL3 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 SDSI FL3 CU 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 BACK FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 FBAC FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TCANFL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TCAFFL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TCND FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TCFDFL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TSCN FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TSCF FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 INNDFL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 INFD FL3 CPS 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 TENS FL3 LB 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 GR FL3 GAPI 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 CCL FL3 V 1023880 O0 000 O0 0 13 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 25-NOV-1997 10:50 PAGE: 45 ** DATA ** DEPT. 9931.000 SIGM. FL3 SBHN. FL3 -999.250 SIGC.FL3 SDSI.FL3 -999.250 BACK. FL3 TCAF. FL3 -999.250 TCND.FL3 TSCF. FL3 -999.250 INND. FL3 GR.FL3 108.485 CCL.FL3 DEPT. 9583.000 SIGM. FL3 SBHN. FL3 48.596 $IGC. FL3 SD$I.FL3 1.384 BACK. FL3 TCAF. FL3 5892.457 TCND.FL3 TSCF. FL3 313.057 INND.FL3 GR.FL3 104.150 CCL.FL3 -999.250 TPHI.FL3 -999.250 SIBH. FL3 -999.250 FBAC. FL3 -999.250 TCFD. FL3 -999.250 INFD. FL3 0.019 38.862 TPHI.FL3 0.000 SIBH. FL3 96.681 FBAC. FL3 6520.969 TCFD.FL3 679.405 INFD.FL3 -999.250 -999.250 SBHF. FL3 -999.250 TRAT. FL3 -999.250 TCAN. FL3 -999.250 TSCN. FL3 -999.250 TENS. FL3 42.355 SBHF. FL3 56.430 TRAT. FL3 30.564 TCAN. FL3 2185.375 TSCN. FL3 197.616 TENS.FL3 - 999.250 - 999. 250 - 999.250 - 999.250 1121. 000 47.713 1.539 17426.137 930.334 1429.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/11/25 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/11/25 ORIGIN : FLIC TAPE NAME : 97423 CONTINUATION # : 1 PREVIOUS TAPE : COF~ENT : BP EXPLORATION, X-02, PRUDHOE BAY, 50-029-20397-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/11/25 ORIGIN : FLIC REEL NAME : 97423 CONTINUATION # : PREVIOUS REEL : COF~VlENT : BP EXPLORATION, X-02, PRUDHOE BAY, 50-029-20397-00