Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
179-071
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Thursday, March 13, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Josh Hunt P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 03-13 PRUDHOE BAY UNIT 03-13 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 03/13/2025 03-13 50-029-20399-00-00 179-071-0 W SPT 8718 1790710 2400 1776 1778 1772 1760 291 665 647 640 REQVAR P Josh Hunt 1/16/2025 2-Year MIT-IA required by AIO 4E.016 to 1.2 x max anticipated well pressure. This well has an OOA which was monitored during the test and remained at 100 psi throughout the test. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 03-13 Inspection Date: Tubing OA Packer Depth 566 2659 2590 2577IA 45 Min 60 Min Rel Insp Num: Insp Num:mitJDH250116134859 BBL Pumped:3.2 BBL Returned:3.2 Thursday, March 13, 2025 Page 1 of 1 9 9 9 9 9 9 999 99 9 9 9 9 9 2-Year MIT-IA required by AIO 4E.016 OOA 100 psi throughout James B. Regg Digitally signed by James B. Regg Date: 2025.03.13 10:24:35 -08'00' MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, February 17, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Adam Earl P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 03-13 PRUDHOE BAY UNIT 03-13 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 02/17/2023 03-13 50-029-20399-00-00 179-071-0 W SPT 8718 1790710 2400 1589 1595 1601 1602 290 615 597 587 REQVAR P Adam Earl 1/3/2023 MIT-IA as per AIO 4E.016 tested to 1.2 X's MAIP. 30 MinPretest Initial 15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name: PRUDHOE BAY UNIT 03-13 Inspection Date: Tubing OA Packer Depth 850 2706 2650 2640IA 45 Min 60 Min Rel Insp Num: Insp Num:mitAGE230106112222 BBL Pumped:2.8 BBL Returned:2.8 Friday, February 17, 2023 Page 1 of 1 MIT-IA as per AIO 4E.016 tested to 1.2 X's MAIP.MIT-IA as per AIO 4E.016 tested to 1.2 X's MAIP. MEMORANDUM State of Alaska Alaska Oil and Cas Conservation Commission TO: DATE: Thursday, January 21, 2021 SUBJECT: Mechanical Integrity Tests JimRegg �c�c�P � ��7{Z P.I. Supervisor g ty Hilcorp Noah Slope, LLC 03-13 FROM: Lou Laubenstein PRUDHOE BAY UNIT 03-13 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Sup" JjBp-- NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 03-13 API Well Number 5 0-02 9-20 3 9 9-0 0-0o Permit Number: 179-071-0 Insp Num: mitLOL210118170613 Rel Insp Num: Inspector Name: Lou Laubenstein Inspection Date: 1/17/2021 .i Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 03-13 ' 'Type Inj W 'TVD 8718 (Tubing 1530 1530 1530 - 1530 " PTD 1790710 ' 'Type Test,. SPT Test psi 2180 IA 465 2505 - 2440 2425 - BBL Pumped: 28 - BBL Returned 2.7 - OA 308 665 - 642 - 625 Interval_ REQVAR P/F P Notes: MIT -IA every 2 years to maximum anticipated well pressure = 1700 psi per AIO 48016 Thursday, January 21, 2021 Page 1 of I MEMORANDUM State of Alaska Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Alaska Oil and Gas Conservation Commission 8718 Tubing 1468 1469 11410 u>> DATE: Wednesday, January 23, 2019 TO: Jim Regg; P.I. Supervisor Rex—IIZ:I 11 SUBJECT: Mechanical Integrity Tests 27 OA , 359698 690 684 - BP EXPLORATION (ALASKA) INC. P - — — 03-13 FROM: Jeff Jones PRUDHOE BAY UNIT 03-13 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Suprv; TU— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 03-13 API Well Number 50-029-20399-00-00 Inspector Name: Jeff Jones Permit Number: 179-071-0 Inspection Date: 1/4/2019 - Insp Num: mitJ119011g141139 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 03-13 Type Inj w - TVD 8718 Tubing 1468 1469 11410 u>> PTD 1790710 ' iType Test SPT Test psi 2180 IA M 2502 2-464 2454 BBL Pumped: z. 'BBL Returned: 27 OA , 359698 690 684 - Interval REQVAR P/F P - — — Notes: AA 4E.016; 2 year MIT I.2 x max. injection pressure, IA x OA communication. 1 well inspected; no exceptions noted. Wednesday, January 23, 2019 Page I of 1 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To Jim Regg ' J I DATE: Monday,January 23,2017 P.I.Supervisor le�cj Vf 2-5` 17 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 03-13 FROM: Brian Bixby PRUDHOE BAY UNIT 03-13 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 03-13 API Well Number 50-029-20399-00-00 Inspector Name: Brian Bixby Permit Number: 179-071-0 Inspection Date: 1/14/2017 Insp Num: mitBDB170114153015 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 03-13 - Type Inj W TVD 8718 • Tubing 1180 - 1175 1172. 1172 • 1175 PTD 1790710 Type Test SPT Test psi 2500 IA 114 2699 - 2656 - 2640 2632 BBL Pumped: I 4.4 BBL Returned: 3.1 ' OA 235 672 630 596 572 Interval REQVAR fP/F P Notes: This well has an AIO 4E.016 and the test pressure is 1.2 times the maximum injection pressure to the pad.I believe the MITIA is a pass but told Josh to put as Incomplete and wait to hear from Jim or Phoebe if it is a pass.The reason is because of the drop in OA pressure and the increase in OOA pressure.OOA Pressures pretest 212 psi,Initial 279psi and then 326/375/408.Per J.Regg,test is a pass. SCANNED APR 0 6 2017. Monday,January 23,2017 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, December 08, 2014 TO: Jim Regg P.I. Supervisor �r'(�� Z3r(�1- SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 03-13 FROM: Bob Noble PRUDHOE BAY UNIT 03-13 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry J -V- NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 03-13 API Well Number 50-029-20399-00-00 Inspector Name: Bob Noble Permit Number: 179-071-0 Inspection Date: 11/30/2014 Insp Num: mitRCN141201073917 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well -j- 03-13 Type Inj W TVD 8718 Tubing 1403 1401 1401 1403 TD ]790710 Type Test SPT Test psi 2180 IA 753 2505 2455 2439 Interval REQVAR P/F P OA 341 630 577 540 Notes: IA x OA, max ant inj psi of 1800, 2160 req test psi SCANNED JAN 0 6 2015 Monday, December 08, 2014 Page I of I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To: Jim Regg DATE: Monday, December 08, 2014 � P.I. Supervisor �� SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 03-13 FROM: Bob Noble PRUDHOE BAY UNIT 03-13 Petroleum Inspector Sre: Inspector Reviewed By: P.I. Supry J;r_ NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 03-13 API Well Number 50-029-20399-00-00 Inspector Name: Bob Noble Permit Number: 179-071-0 Inspection Date: 11/30/2014 Ictsp Num: mitRCN141201073917 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 03-13 Type Inj W TVD 8718 Tubing 1403 1401 1401. 1403 — PTD 1790710 Type Test SPT (Test psi 2180 IA 753 2505 2455 - 2439 - Interval IREQVAR P/F P OA 341 630 577 t-54-0- 40,Notes: Notes:IA x OA, max ant inj psi of 1800, 2160 req test psi- CRNNEID DEQ 3 20�; Monday, December 08, 2014 Page 1 of 1 • MEMORANDUM • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Friday, January 25, 2013 TO Jim R egg --;7 l i ze "l i P.I. Supervisor N - I SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 03-13 FROM: Lou Grimaldi PRUDHOE BAY UNIT 03-13 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry NON-CONFIDENTIAL Comm Well N ame PRUDHOE BAY UNIT 03-13 API Well Number 50-029-20399-00-00 Inspector Name: Lou Grimaldi Permit Number: 179-071-0 Inspection Date: 1/6/2013 Insp Num: mitLG130106170143 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min , Well I 03-13 ' IType Inj I w ITVD 8718 - IA I 623 2510 . , 2452 1 2433 - T , 1 1 PTD I 1790710 IT Test SP Test ' 2179 H OA • , ype es 1 , es psi 272 582. , 512 - 477 1 Interval IREQVAR ' P/F P . Tubing I 1466 - , 1466 1459 1457 -1 I . 1 Notes: 3 bbl's pumped, 2.6 returned. Test required for variance compliance. A10 4E.016. v SCANNED APR 1 1 2013 Friday, January 25, 2013 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Wednesday, February 09, 2011 Jim Re P.I. Supervisor ` t/ Z/ 1 U ( ( SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 03 -13 FROM: Chuck Scheve PRUDHOE BAY UNIT 03 -13 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry ..GPI NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 03 -13 API Well Number: 50- 029 - 20399 -00 -00 Inspector Name: Chuck Scheve Insp Num: mitCS110207125841 Permit Number: 179 -071 -0 Inspection Date: 2/5/2011 - Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 03-13 ' Type Inj. ' W TVD 8718 / IA 600 2400 / 2360 2350 ' P.T.Dj 1790710 ' TypeTest SPT Test psi 2179 ' OA 280 580 540 500 Interval 1 Qv' P/F P Tubing 1600 1600 1550 1550 Notes: z ,iti APR 3, 3 !u1I i t Wednesday, February 09, 2011 Page 1 of 1 ~ STATE OF ALASKA ~ ALAS IL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ SUmulate~ ' Other ~ B#71GHT~NATER"> Performed: Alter Casing ~ Puii Tubing ~ Perforate New Pool ~ Waiver~ Time Extension ~ TREATMENT Change Approved Program ~ Operat. Shutdown ~ Pertorate ~ Re-enter Suspended Well ~ 2. Operator BP Exploration (Alaska), Inc. 4, Well Class Before Work: 5. Permit to Drill Number: Name: Development ~ Exploratory ^ 179-0710 ~ 3. Address: P.O. Box 196612 Stratigraphic^ Service ^~ 6. API Number: Anchorage,AK 99519-6612 J 50-029-20399-00-00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO-028328 / PBU 03-13 ~ 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE BAY POOL ~ 11. Present Well Condition Summary: Total Depth measured 11925 ~ feet Plugs (measured) 11308' 11/24/09 feet true vertical -844~-~3~- feet Junk (measured) None feet ~~ ,~r~ 91i~v9 Effective Depth measured 11834 feet Packer (measured) 10929 true vertical 9317 feet (true vertical) 8718 Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" 91.5# H-40 34 - 714 34 - 114 1490 470 Surface 2697 13-3/8" 72# L-80 33 - 2730 33 - 2715 4930 2670 Intermediate 11845 9-5/8" 47# S-95 32 - 11877 32 - 9413 8150 5080 Production 11599 7-5/8" 29.7# L-80 31 - 11630 31 - 9232 6890 4790 Liner Liner Pertoration depth: Measured depth: SEE ATTACHED - ,_ _ _ _ True Vertical depth: _ ,_ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 26 - 11038 ,_ _, ~ 26 - 8797 Packers and SSSV (type measured and true vertical depth) 4-1/2" Baker SAB Perm Packer GQS' 10929 ~ ~~"z 8718 , j 12. Stimulation or cement squeeze summary: Intervalstreated(measured): ,; , ,,.;~ , F~s~~~~ Treatment descriptions including volumes used and final pressure: 13. Representative DailyAverage Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 11344 1658 Subsequent to operation: 11344 1658 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ~ Service ^~ Daily Report of Well Operations X i6. Well Status after work: Oil Gas WDSPL GSTOR ~ WAG ~ GINJ ^ WINJ Q SPLUG ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 9/15/2009 Form 10-404 F~vised 7/2009 ~~~~2Submit Original On~ ~~~ ~ ~'~~ ~~`d:. ~~"s . y , t`~~~" 7 03-13 179-071 PFRF oTTOC:HMENT . . Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 03-13 2/26/80 PER 11,193. 11,223. 8,911.34 8,933.35 03-13 2/26/80 PER 11,263. 11,293. 8,962.68 8,984.67 03-13 2/27/81 RPF 11,194. 11,224. 8,912.08 8,934.09 03-13 2/27/81 RPF 11,264. 11,294. 8,963.41 8,985.4 03-13 2/27/84 APF 11,294. 11,314. 8,985.4 9,000.05 03-13 2/27/84 APF 11,224. 11,234. 8,934.09 8,941.42 03-13 2/27/84 APF 11,160. 11,190. 8,887.1 8,909.14 03-13 2/27/84 APF 11,090. 11,145. 8,835.54 8,876.06 03-13 5/27/84 APF 11,064. 11,084. 8,816.4 8,831.12 03-13 4/28/90 RPF 11,264. 11,314. 8,963.41 9,000.05 03-13 4/28/90 RPF 11,214. 11,234. 8,926.75 8,941.42 03-13 4/28/90 RPF 11,194. 11,214. 8,912.08 8,926.75 03-13 4/28/90 RPF 11,160. 11,190. 8,887.1 8,909.14 03-13 4/28/90 RPF '11,090. 11,145. 8,835.54 8,876.06 03-13 4/28/90 RPF 11,064. 11,084. 8,816.4 8,831.12 03-13 4/7/95 APF 11,340. 11,360. 9,019.09 9,033.74 03-13 4/8/95 RPF 11,214. 11,234. 8,926.75 8,941.42 03-13 4/8/95 RPF 11,280. 11,314. 8,975.14 9,000.05 03-13 4/8/95 APF 11,314. 11,320. 9,000.05 9,004.44 03-13 12/10/95 RPF 11,210. 11,230. 8,923.82 8,938.49 03-13 12/10/95 RPF 11,275. 11,315. 8,971.48 9,000.78 03-13 12/10/95 RPF 11,340. 11,360. 9,019.09 9,033.74 03-13 11/24/96 BPS 11,330. 11,340. 9,011.77 9,019.09 03-13 11/24/96 MIS 11,308. 11,330. 8,995.65 9,011.77 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ ~ 03-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY _ ..~ 'a~'~ ° 1 - ~ _ ~ ~ 8/28/2009~T/I/0=1300/320/320. Temp=Online. BrightWater project. Pump BrightWater ' ; !chemical as directed. "'' Continued on day shift *" Final T/I/0=1300/320/320. ; ~ Dayshift in control of valves upon departure. ~ _____._ ., ____----_-.~ 8/29/2009~T/I/O/00= 1200/500/300/300. Temp= Hot. Pump Brightwater chemicals into ; j injection stream. Put diaphragm pump in Poly suction line. Changed out with ; 3 night shift. ~ _ _. __ _ ____ _ ~ _ _._._. . __._. .__ --_.__ ~ 8/29/2009;T/I/0=1200/320/320. Temp=Online. BrightWater project. '* Continued from Idayshift *" Continued pumping BrightWater polymer as required. Final i ; T/I/0=1350/320/320. "Dayshift in control of tree valves upon departure. ! ~8/30/2009jT/U0=1400/320/320. Temp=Online. BrightWater project. "'` Continued from ~ Edayshift ** Continue to pump BrightWater chemicals as required. Final ~ ~ T/I/0=1300/320/320. ;Dayshift in control of tree valves upon departure ~ ..__ ~__.__ ~_.~_ - ___..__~____~~_.~~.~. ~._ ~. ~_~_ ~ ~__ ______._.~,...______..~ 8/30/2009;T/I/0= 1400/500/300/300. Temp= Hot. Pump Brightwater treatment. ~ ~ Pumped polymer, surfactant into injection stream. Loaded one polymer '.transport. Swapped to 3rd polymer transport @ 10:45 AM. Continued to night : shift. ~~.. ~.~_..~~_,._ _ ~. , ~8/31/2009~T/I/0= 1350/320/320. Temp= Hot. Pump Brightwater treatment. (Continued 'from night shift). Continue to pump BW chemicals as required. Finished 6pumping BW chemical @ 11:30 AM. Finished pumping surfactant @ 12:00 ' ~AM. ~ ~Pumped 3875 gallons EC9360 from IMO # AWXU530131, with 1154 gallons ~remaining. :Pumped 4923 gallons EC9378 from IMO # TIFU148046. ~ ~ ~Pumped 4901 gallons EC9378 from IMO # AWXU630177. ~ ~ Pumped 4434 gallons EC9378 from IMO # AWXU630217. ~ :Loaded 5280 gallons EC9398 from IMO # TIFU324527 into IMO # ~ 'TIFU148046. (Mislabeled as EC9378). ~ ~ ~Pumped 1448 gallons EC9398 from IMO # TIFU148046 with 3832 gallons ~ ;remaining. ~SV,CV=C. WV,SSV,MV=O. IA,OA=OTG. RDMO. • MEMORANDUM To: Jim Regg ~~~,,, tl ~ 2ct~ P.I. Supervisor ~ ! FROM: Jeff Jones Petroleum Inspector • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, January 22, 2009 SUBJECT: Mechanical Integrity "Pests BPFXPLORATION(ALASKA)INC 03-13 PRUDHOE BAY UNIT 03-13 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv _~~~~-- Comm Well Name: PRUDHOE BAY UNTI' 03-13 API Well Number: 50-029-20399-00-00 Inspector Name: JeY'f Jones mitJJ090 1 1 920 1 8 54 Permit Number: 179-071=0 Inspection Date: lilai2oo9 Insp Num: Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well i ...0313 !Type Inj. N' TVD ~ s~ls ~' Ip eto zsoo ~~ zaso z4~o ~ _ ~___ _._ . _.. _ _ _~ 390 340 330 / P.T. ~ 179o~to TypeTest ' sPT Test psi. _ zsoo ~ OA z3s _ _ ___ Interval REQvAR _p/F P Tubing I goo i I Sao t Sao I Sao _ _ _ _. NOtes: This well has known slow lA X OA communication. 3 BBLS methanol pumped. I well inspected; no exceptions noted. ~~ Q~ ~ 0(~P _' ~~ Ntiyt:SA ` 1 fk??()~+s; Mc'Oc G)h prP ssvve... l'i`+T~~t,uFar ~ ~2.CX-~-~t,Ql2" JE:-~tr7"N~0.~C. .!, ~ ` i G}' ;~ r` b' ~ ~ ~ Iii ~Y' J Thursday, January 22, 2009 Page I of 1 TREE _ 7 ~VELLHEAD= m.... FMC GEN 2 RE1R0 TO G E N4 -..~~~- ACTUATOR= __-..._.._..____--- _ _ ~~"-~ FMC OTIS ~-..-T ._ KB. ELEV = . ~,s.-.. ~~ 64 ,_... ~... .GL = 25 .. KOP m,_~_.. _ ~...~._.... 2 i 00 Max An le ,.:9 . , , .. ..,~ 49 r 10000 Datum MD = 11129 ~ Datum TVD= .., ~ 8800 SS 13-3/8" CSG, 72# L-$0, ID = 12.347" 2729' 03-13 2199' ~--~ 4-112" OTIS NRQ SSSV NIPPLE, ID = 3.813" ' r 7U~U4~ ~--1 4-112" BAKER PBR W/GBH SEAL ASSY Minimum ID = 3.725 @ 11025 10929' 7-5;8" X 4-1(2" BAKER SAB PERM PKR 4112 QTtS XN NiPPLE 11025' ~-{ 4-1l2" OTIS XN NIPPLE, ID = 3.725" 4-112" TBG-PC, 12.6#, L80, .0152 bpf , ID = 3.958" 11037' PERFORATION SUMMARY REF LOG: BHCS on 11!25/79 ANGLE AT TOP PERF: 43 @ 11060 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 11064 - 11084 O p4/28/90 3-3/8" 11090 - 11145 O 04/28/90 3-3/8" 11160 - 11190 O 04!28/90 3-3/8" 6 11194 - 11234 O 12/10/95 3-3/8" 6 11264 - 11320 S 12/10/95 11308 - 11320 S 11/24!96 11328 - 11330 S 11/24196 11340 - 11360 S 11 /24196 3-3/8" 4 11340 - 11360 S 04/07/95 11423 - 11425 S 04128!90 -5/8" lNR-SCAB, 29.7# L-80, ID = 6.875" 11630' 9-5/8" CSG, 47#, S-95, ID = 8.681" 11877' j 17 037' ~-1 4-1l2" BKR SHEAROUT SUB WLEG 11038' - 4-1l2" TUBWG TAIL ^~ 10996' ELM TT-LOGGED ON 04!28/90 11330' --L CMT REl-AINER (11;24196 11308' ELMD -PLUG 11127(96 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/04/79 ORIGINAL COMPLETION WELL: 03-13 04!16/90 LAST WORKOVER PERMIT No:1790710 02/14/01 TP CORRECTIONS API No: 50-029-20399-00 08/07102 BHClTLH PERF CORRECTIONS SEC14 T10N R15E 1330.37 FEL 4709.48 FNL 02/21/06 PJPlTLH PERF CORRECTIONS BP Exploration (Alaska) 03-13 AA Compliance Testing Due 1/14/09 Regg, James B (DOA) From: Regg, James B (DOA) Sent: Monday, January 12, 2009 4:21 PM~ ~ t~ (Z~ ~`I To: 'NSU, ADW Well Integrity Engineer' Cc: Holt, Ryan P (ASRC) Subject: RE: 03-13 AA Compliance Testing Due 1/14/09 Page 1 of 1 .., „..;. Based on the information provided, it is acceptable to postpone the ~t1fl"IA to allow a Commission Inspector to witness the test. Thank you far the natificatian. Jim Regg AOGCC 333 W.7th Avenue, Suite 100 Anchorage, AK 99501 907-793-1236 From: NSU, ADW Well Integrity Engineer [mailto:NSUADWWeIIIntegrityEngineer@BP.com] Sent: Monday, January 12, 2009 3:15 PM To: Regg, James B (DOA) Cc: NSU, ADW Well Integrity Engineer; Holt, Ryan P (ASRC) Subject: 03-13 AA Compliance Testing Due 1/14/09 Jim, 03-13 (PTD #1790710) is an injector limited to PWI per 4E.016 for slow IAxOA communication. The 2-year test for AA compliance is due on 01/14/09. However, coil tubing is currently rigging up on the well next door for a mill job that is expected to take several days. 03-13 passed an MIT-IA today to 2500 psi, but it was not AOGCC witnessed. This email is to gain approval to postpone the witnessed test for up to a week to allow for coil tubing to move off the well next door. Please let me know if additional information is required to aid in your decision. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 1/12/2009 • • ~~Rs~J~d P~L/M, v01/~RPJOJd ~a ~~vv ssy-~~t~~~ ~ 333 W. 7th AVENUE, SUITE 100 ~1o®~a7~~~4'~~a®6~ ~® y~+~~®~ ANCHORAGE; ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 ADMINISTRATIVE APPR®VAL AIO 4E.016 Mr. Steve Rossberg, Wells Manager BP Exploration (Alaska) Inc. ~`~'~~'~~~~ JAN ~ ~ 2008 P.O. Box 196612 Anchorage, AK 99519-6612 RE: PBU 03-13 (PTD 1790710) Request for Administrative Approval Dear Mr. Rossberg: In accordance with Rule 9 of Area Injection Order 04E.000, the Alaska Oil and Gas Conservation Commission ("AOGCC" or "Commission") hereby grants BP Exploration (Alaska) Inc. ("BPXA")'s request for administrative approval to inject water in the subject well. The Commission hereby denies BPXA's request for administrative approval to inject gas in the subject well. PBU 03-13 exhibits inner annulus to outer annulus communication. AOGCC finds that BPXA has elected to perform no corrective action at this time on PBU 03-13 and is able to manage the surface casing pressure with pressure bleeds. The Commission further finds that, based upon reported results of BPXA's diagnostic procedures, PBU 03-13 exhibits two competent barriers to release of well pressure. Accordingly, the Commission believes that well operation in water injection service will not threaten the environment or human safety. However, the Commission believes that PBU 03-13's condition does not conform to the relatively more stringent standards of well integrity necessary to ensure safe gas injection. AOGCC's administrative approval to inject water only in PBU 03-13 is conditioned upon the following: 1. BPXA shall record wellhead pressures and injection rate daily; 2. BPXA shall submit to the AOGCC a monthly report of well pressures and injection rates; 3. BPXA shall perform aMIT-IA every 2 years to 1.2 times the maximum anticipated well pressure; 4. BPXA shall limit the web's OA pressure to 1000 psi; AID 4E.016 • • February 3, 2007 Page 2 ~f 2 ~, l~F~ shall immediately shut in the wvell ansi n®ti~~ the ~~~C~~ iF tigeYe is any change in the well's mechanical condition; 5. after well shut in due to a change in the well's mechanical condition, ACCaCC approval shall be required to restart injection; and 7. The M1T anniversary date is January 14, 2007. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. D®NE at Chairman Alaska and dated February 9, 2007. Cathy . Foerster Co rissioner RE: PBU 03-13 (1790710) Admin APprova*uest . D~o1 Jim ~ Here are the two requested test forms¡ one from 01/14/07 and one from 04/09/03. Thank you - Jack L. Winslow Well Integrity Engineer office - 659-5102 pager - 659-5100, ext. 1154 SCANNED FEB 0 7 2007 -----Original Message----- From: James Regg [mailt_~;j_:!:..1!1~~9~ªs!¡!.!..in.:~_t._2I,t.~:.:.9k_=._~1~] Sent: Friday, January 26, 2007 2:37 PM To: NSU, ADW Well Integrity Engineer Subject: PBU 03-13 (1790710) Admin Approval Request Received admin approval for this well¡ BP references an MITIA done on 1/14/07¡ we do not have a record of that test (last MIT in our files was 7/22/2001). Our records show the well has been injecting water since 2003 (SI Aug-Oct)¡ well has continuously injected water or gas since MIT done in 2001. Please provide MIT that comply with AIO 4E (should have been an MIT done no later than 7/2005) and the 1/14/2007 test. Thank you. Jim Regg AOGCC Content-Description: MIT PBU 03-13 01-14-07.xls MIT PBU 03-13 0l-14-07.xls Content-Type: applicationlvnd.ms-excel Content-Encoding: base64 Content-Description: MIT PBU 03-13 04-09-03.xls MIT PBU 03-13 04-09-03.xls Content-Type: applicationlvnd.ms-excel Content-Encoding: base64 I of 1 1/29/2007 II :20 AM . . STATE OF ALASKA ALASKA Oil AND GAS CONSERVATION COMMISSION Mechanical Integrity Test \ \ ,;0\D1 'Z-~q Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us;Tom_Maunder@admin.state.ak.us OPERATOR: FIELD 1 UNIT 1 PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska), Inc. Prudhoe Bay 1 PBU / OS 03 04/09/03 John Cubbon Packer Depth Pretest Initial 15 Min. 30 Min. Well 103-13 I Type Ini. I W TVO I 8,718' Tubing 1,460 1,460 1,460 1,460 Intervall 4 P.T.D.I1790710 I Type test I P Test psi! 2180 Casing 500 3,520 3,430 3,410 P/FI P Notes: MITIA to 3500 psi pre-MI injection OA 750 1300 1200 1100 Weill I Type Inj. I I TVD I I Tubing Interval I P.T.D.I I Type test I I Test psil I Casing P/FI Notes: I OA Weill I Type Inj.1 TVD I I TUbingl I I I I Interval I P.T.D.I I Type testl Test psil I Casing I I I P/FI Notes: I OAI I I I I Weill I Type Inj.1 I TVD I Tubing Interval I P.T.D.I I Type test I I Test psi! Casing P/FI Notes: OA Weill I Type Inj.1 I TVD I Tubing Interval I P.T.D.I I Type test I I Test psi! Casing P/FI Notes: OA TYPE INJ Codes D = Drilling Waste G=Gas I = Industrial Wastewater N = Not Injecting W = Water MIT Report Form BFL 9/1/05 TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Intemal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover o = Other (describe in notes) MIT PBU 03-13 04-09-03.xls , . . STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test \1-;Ù\01 ~f{1 \ Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us;Tom_Maunder@admin.state.ak.us OPERATOR: FIELD 1 UNIT 1 PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska), Inc. Prudhoe Bay 1 PBU 1 DS 03 01/14/07 Andrea Hughes Packer Depth Pretest Initial 15Min. 30 Min. Well 103-13 I Type Inj. I W TVD I 8,718' TubinQ 1,540 1,540 1,540 1,540 IntervaIT 0 P.T.D.11790710 I Tvpe test I P Test psil 2180 Casing 320 3,000 2,920 2,880 P/FI P Notes: MIT-IA to 3000 psi for AA Applicaton OA 400 820 650 550 Weill I Type Inj. I I TVD I I Tubing I I I Interval' P.T.D.I I Type test I I Test psi! I Casing I I I PIA Notes: I OA I I I Weill I Type Inj.l I TVD I Tubing Interval I P.T.D.I I Type testl I Test psil Casing P/FI Notes: OA Weill I Type Ini.1 I TVD I Tubing IntervalT P.T.D.I I Type test I I Test psi I Casing P/FT Notes: OA Weill I Type Ini.1 I TVD I Tubing IntervalT P.T.D.I I Type testl I Test psi I Casing P/FT Notes: OA TYPE INJ Codes D = Drilling Waste G=Gas I = Industrial Wastewater N = Not Injecting W = Water MIT Report Form BFL 9/1/05 TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential T emperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover o = other (describe in notes) 2007-0114_MIT_PBU_03-13.xls ') STATE OF ALASKA ) ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERAT1,QNS,,' /V\,': .,::" ,,:. :;';",~~", '¡, BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 1. Operations Performed: Abandon D Alter Casing D Change Approved Program D 2. Operator Name: 3. Address: 64.00 8. Property Designation: ADL-0028328 11. Present Well Condition Summary: Total Depth 2004 \ "'l¡ Repair Well 0 PluQ PerforationsD Pull TubingD Perforate New Pool 0 Operation Shutdown 0 Perforate 0 Stimulate D OtherŒJ WaiverD Time ExtensionD Re-enter Suspended Well 0 5. Permit to Drill Number: 179-0710 6. API Number 50-029-20399-00-00 Bright Water Inj 4. Current Well Class: Development 0 ExploratoryD Service ŒI Stratigraphic 0 9. Well Name and Number: 03-13 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool measured 11925 feet None Effective Depth true vertical 9447.6 feet None measured 11308 feet Plugs (measured) Junk (measured) true vertical 8995.7 feet Casing Conductor Intermediate Production Surface Length 80 11845 11599 2697 Perforation depth: Size 2088 91.5# H-40 9-5/888 47# 8-95 7-5/888 29.7# L-80 13-3/888 72# L-80 MD TVD Burst Collapse 34 114 34.0 - 114.0 1490 470 32 - 11877 32.0 - 9412.5 8150 5080 31 - 11630 31.0 - 9231.5 6890 4790 33 - 2730 33.0 - 2715.0 4930 2670 Measured depth: 11064 -11084,11090 -11145,11160 -11190,11193 -11194,11194 -11210,11210 -11214,11214 -11223 11223 - 11224, 11224 - 11230, 11230 - 11234, 11263 - 11264, 11294 - 11308 True vertical depth: 8816.4 - 8831.12,8835.54 - 8876.06,8887.1 - 8909.14,8911.34 - 8912.08,8912.08 - 8923.82,8923.82 - 8926.75 8926.75 - 8933.35,8933.35 - 8934.09,8934.09 - 8938.49,8938.49 - 8941.42,8962.68 - 8963.41,8963.41 - 8971.48 8971.48 - 8975.14,8975.14 - 8984.67,8984.67 - 8985.4,8985.4 - 8995.65 Tubing ( size, grade, and measured depth): 4-1/288 12.6# L-80 @ 26 11038 4-1/288 Baker SAB Perm Packer Packers & SSSV (type & measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0 -5437 0 -5132 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run- Daily Report of Well Operations - ! @ 10929 SCANNE[) NOV 2 4 2004 Oil-Bbl 0 0 Tubing Pressure 1213 1210 15. Well Class after proposed wo~ ExploratoryU 16. Well Status after proposed work: DevelopmentD Service ŒJ OilD GasD WAG D GINJD WINJ~ WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: 304-311 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Garry Catron Garry Catron j1u~ Signature Form 10-404 Revised 4/2004 Title Production Technical Assistant Gdr;;- ~ Phone 564-4657 Date 11/23/04 OF{fGfNAL RBDMS BFL NOV 2 6 1004 ) ) 03-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/20/04 Start Bright Water Surfactent/Ploymer Flood. FLUIDS PUMPED BBLS No Fluids Pumped 0 ITOTAL Page 1 ) TREE = --- ? WELLHEAD= FtvC GEN 2 RETRO TO G8\J4 A CTÜÀ fOR;;; m umuummmmmumuumuum FMC 011S ^KB~ÊiEV = -----'^-----64' .....~~~ BF. ELEV = GL = 25 _~^"""",,^,~~nm. m.._~""" un mmnmmummn- KOP = 2100 ~..~._...- Max Angle = 49 @ 10000 U6àtum"MÕ-;;,--,m"m"",m"""u___'M",,,,m'''M,,,m,,m''''Mm_"",mm''f1''129' 'Õaturñ"fVö;;".."m".__.m...m'm_m"'''.m."omom''''.m__--..''..-..m-S8õ"ifss I 13-318" CSG, 72# L-80, 10=12.347 H 2729' Minimum D = 3.725 @ 11025 4 1/2 OTIS XN NIPPLE 4-1/2" lBG-PC, 12.6#, LBO, 0.0152 bpf ,10=3.958 H 11037 I ÆRFORA 110N SLMMARY RB= LOG: BHCS on 11/25(19 ANGLE AT TOP PERF: 43 @ 11060 Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DA TE 3-318" 11064- 11084 0 04/28/90 3-318" 11090 - 11145 0 04128/90 3-318" 11160 - 11190 0 04/28/90 3-318" 6 11194- 11234 0 12/10/95 3-318" 6 11264 - 11320 S 12/10/95 11308 - 11320 S 11/24/96 11328 - 11330 S 11/24/96 11340- 11360 0 12/10/95 3-318" 4 11340 - 11360 S 04/07/95 11423 - 11425 S 04128/90 I 7-5/8" LNR-SCAB, 29.7# L-80, 10=6.875 H 11630' I I 9-518" CSG, 47#, S-95, 10=8.681 H 11877' J-4I 03-13 <8 ~ l ~ I I ) I SA FETY NOTES: SeA B LINER 2199' H 4-112" 011S HRQSSSV NIR>LE, 10= 3.813 I ~ J I 10904' H 4-1/2" BAKERPBR W/GBH SEAL ASSY / ~ z---l 10929' H 7-5/8" X 4-1/2" BAKER SAB PERI'v1 R<R I 11025' H 4-1/2" OTIS XN NPPLE, 10=3.725 I \ ! 11037' H 4-1/2"BKRSHEAROUTSUBWLEG I ~ 11038' H 4-1/2" TL6ING TAIL I I 10996' HELM TT-LOGGEO 4-28-90 I ~ I 11330' H CMTRETANER(SET 11/24/96) I 11308' H EUvÐ - PLLG 11/27/96 I I II ... DA TE REV BY COMM8\JTS 08107/02 BHCAlh PERF CORRECTIONS DATE REV BY COMMENTS 12/04/79 ORIGINAL COMA..ETlON 04/16/90 LAST WORKOVER 12/22/00 SIS-QAA CONVERfED TO CANVAS 01/04/01 SIS-MD FNA L 02/14/01 TP CORRECTIONS PRU[]-OE BAY UNIT WELL: 03-13 ÆRMT f\b: 179-071 API f\b: 50-029-20399-00 SEC14 T10N R15E1330.37 FEL4709.48 FN... 8P Exploration (Alaska) . bp ~ ~ 0 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 August 2, 2004 Commissioners Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage,AJ< 99501 JPF~ ~Jj Dear Commissioners: Bright Water is a novel "designer" polymer about to be tested at GPB for deep waterflood confonnance improvement. The objective is to reduce water cycling through the high penneability micro thief connection between GPB Injector and Producer in three FS2 patterns 03-13, 16-11, and 16-16 with a heat and time reactant treatment. Additional patterns in the North West Fault Block (NWFB) will also be treated. The fITSt pattern identified is injector S-06. The fast water transit time through high penn matrix rock prevents efficient waterflood sweep of reserves in the layers above and below. This treatment reacts with heat over time in the reservoir and will increase in size, thereby diverting water to lower penn upswept intervals. The timing for injection and set up of the Bright Water polymer is based on a MI/RMI Analysis. It has been trialed with Chevron in Indonesia with success and documented in SPE paper # 84987. Another SPE paper, #89391, provides more in depth detail on how this "designer" polymer works. We will inject this polymer into these injectors starting around August 31, 2004. A test application using this product was done in Mid-July in the Milne field. Sincerely, ~CM~ T" i '- t\~jG J ? nr14 BP Reservoir Engineer P.O. Box 196612 Anchorage, Alaska 99519 Phone 907-564-5737 .,' ORtGINAL ~ ~ \jJ61t; -0 {fl (w°lt Dr J ~ /£/ f <f- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 / StratigraphicD Service ŒJ 9. Well Name and Num7: 03-13 10. Field/Pool(s): Prudhoe Ba Field / Prudhoe Oil Pool PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): 9447.6 11834 9317.0 S~ MD WD 1. Type of Request: Abandon 0 Alter Casing D Change Approved Program Œ] 2. Operator Name: Suspend 0 RepairWell D Pull Tubing 0 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 64.00 KB 8. Property Designation: ADL-0028328 3. Address: 11. Total Depth MD (ft): 11925 Casing Conductor 80 20" 91.5# H-40 Intermediate 11845 9-5/8" 47# S-95 Production 11599 7-5/8" 29.7# L-80 Surface 2697 13-3/8" 72# L-80 Perforation Depth MD (ft): Perforation Depth TVD (ft): See Attachment Packers and SSSV Type: 4-1/2" Baker SAB Perm Packer 12. Attachments: Description Summary of Proposal 0 Detailed Operations Program 00 BOP Sketch 0 14. Estimated Date for Commencin 0 eration: 16. Verbal Approval: Commission Representative: September 15, 2004 Date: Operation Shutdown D Plug Perforations 0 Perforate New Pool D 4. Current Well Class: PerforateD WaiverD Annular DisposalD StimulateD Time ExtensionD OtherŒ] Re-enter Suspended Well 0 Bright Water In) 5. Permit to Drill Numþer: 179-0710 / Development D Exploratory D 6. API Number 50-029-20399-00-00 Plugs (md): None Burst Junk (md): None Collapse to bottom to bottom 34 114 34.0 114.0 1490 470 32 11877 32.0 9412.5 8150 5080 31 11630 31.0 9231.5 6890 4790 33 2730 33.0 2715.0 4930 2670 Tubing Size: Tubing Grade: Tubing MD (ft): 4.5 " 12.6 # L-80 11038 Packers and SSSV MD (ft): 10929 .4U!:.' ¡ 13. Well Class after proposed work: Q¡ & ~' (1}4 ExploratoryD Development~~ Ox 15. Well Status after proposed work: Oil D GasO WAG 0 GINJD / PluggedO AbandonedO WINJI!! WDSPLD Prepared by Garry Catron 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Signature Contact Steve Carhart Title Phone Reservoir En ineer 564-5737 6/10/04 ommlsslon Use nl BOP TestO Conditions of approval: Notify Commission so that a representative may witness Location Clearance 0 Other: Appro Form 10-403 Revised 12/2003 , " Mechanciallntegrity Test D BY ORDER OF THE COMMISSION RBOMS 8FL AU6 1 8 1O0~ ORIGINAL SUBMIT IN DUPLICATE ~ ~ Attachment / Perforation Depth MD (ft): 11064 - 11084 11090 - 11145 11160 - 11190 11193 - 11194 11194 - 11210 11210 - 11214 11214 - 11223 11223 - 11224 11224 - 11230 11230 - 11234 11263 - 11264 11264 - 11275 11275 - 11280 11280 - 11293 11293 - 11294 11294 - 11308 Perforation Depth TVD (ft): 8816.4 8831.1 8835.54 8876.1 8887.1 8909.1 8911.34 8912.1 8912.08 8923.8 8923.82 8926.8 8926.75 8933.4 8933.35 8934.1 8934.09 8938.5 8938.49 8941.4 8962.68 8963.4 8963.41 8971.5 8971.48 8975.1 8975.14 8984.7 8984.67 8985.4 8985.4 8995.7 Page 1 ~ ~ TREE = --_? 03-13 WELLHEAD= FM:: GEN 2 RETRO TO GEN4 ACn.l<\TOR- FMC OllS KB. 8..EV = 64 BF. ELEV= GL = 25 KOP= 2100 Max Angle - 49@ 10000 Datum MD = 11129 Datum TVD- 8800 SS 13-318" CSG, 72# L-80, ID=12.347 Minimum D = 3.725 @ 11025 4 1/2 OTIS XN NIPPLE 4-1/2" TBG-PC, 12.6#, L80, 0.0152 bpf, 10=3.958 ÆRFORA lION SLMMARY REF LOG: BI-CS on 11/25f79 ANGLE AT TOP PERF: 43@ 11060 Note: Refer to Production DB for hi;torical perf data SIZE SR= INTERVAL Opn/Sqz [)6. TE 3-318" 11064- 11084 0 04/28/90 3-318" 11090-11145 0 04/28/90 3-318" 11160-11190 0 04/28/90 3-318" 6 11194-11234 0 12/10/95 3-318" 6 11264-11320 S 12/10/95 11308-11320 S 11/24/96 11328-11330 S 11/24/96 11340-11360 0 12/10/95 3-318" 4 11340 - 11360 S 04/07/95 11423 - 11425 S 04/28/90 I 7-5/£!' LNR-SCAB, 29.7# L-80, 10=6.875 H 11630' I 9-518" CSG, 47#, S-95, ID=8.681 / I SAFETY NOTES: SCAB Llt-.ER . 4-1/2" OllS HRQSSSV NIFPLE, 10= 3.813 10904' 4-1/2" BAKER PBR W/GBH SEAL ASSY 10929' 7-518" X 4-1IZ' BAKER SAB PERM A<R 11025' 4-1/2" OTIS XN NPPLE, 10=3.725 11037' 4-1/2"BKRSI-£AROUTSUBWLEG 11038' 4-1IZ' TLBING TAIL I 10996' H ELM TT-LOGGED 4-28-90 I 11330' C1v1T RErANER (SET 11/24/96) I 11308' H 8..W-PL1X311/27/96 I DATE REVBY COM MONTS DATE RB' BY OOr.fvlENTS 12/04/79 ORIGINAL COMR..ETlON 08/07/02 BHCltlh PERF OORRECTIONS 04/16/90 LAST WORKOVER 12/22/00 SIS-QAA CONVERrEDTO CANVAS 01/04/01 SlS-MD FNAL 02/14/01 TP CORRECTIONS PRUCHOEBAY UNIT WELL 03-13 ÆRMT f\b: 17g.071 API f\b: 50.{)2g.2039g.00 SEC14 T1 ON R15E 1330.37 FEL 4709.48 FN... BP exploration (Alaska) ids ~ II. WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC Atten: Robin Deason 333 W. 7"'Street Suite # 1 00 Anchorage, Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1389 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 WELL DATE LOG TVPE Electronic Data ImaÇJes 1 BLUE LINE PRINT(S) REPORT OR COLOR Open Hole 1 /7C¡-C»1 os 03-13 6-1 0-04 I .) ~~ ~ J Res. Eva!. CH 1 1 Print Name: /1 ", I /I ,: ß ¡' ,/ ., r:, "I ' I~;' U ";¿'y t~~(l¥à Date: 'I,Ll) .u~ ~I Signed: Ok ~CL,"~~ PRoAnivE DiAc.NO~Jk SERVius, INC, PO Box I >ó9 SJAffoRd IX 77477 Phone:(28I ) 565-9085 Fax:(281) 565-1369 E-mail: pdsll]'memorylog.com Website: \\ww.memorylog.com STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: SCHMOO-B-GONE Operation shutdown_ Stimulate _X Pull tubing _ Alter casing _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development __ Explorato~__ Stratigraphic__ Service__X 4. Location of well at surface 4432' FNL, 4369' FEL, Sec. 11, T10N, R15E, UM At top of productive interval 3510' FNL, 695' FEL, Sec. 14, T10N, R15E, UM At effective depth 4322' FNL, 1491' FEL, Sec. 14, T10N, R15E, UM At total depth 4710' FNL, 1332' FEL, Sec. 14, T10N, R15E, UM (asp's 714186, 593691~ (asp's 717987, 5932663) (asp's 717216, 5931829) (asp's 717386, 5931445) Plugging _ Perforate _ Repair well _ Other _ 6. Datum elevation (DF or KB feet) RKB 64 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 03-13 9. Permit number / approval number ~ 179-071 10. APl number 50-029-20399-00 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical 11925 feet 9448 feet Plugs (measured) Tagged CMT Plug @ 11308' ELMD (11/27/1996). Effective depth: measured 11308 feet Junk (measured) true vertical 8996 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 80' 20" 500 sx AS ---.-~.- . ~~. 113' Surface 2696' 13-3/8" 6114 sx PF 2729' 2713' 1500 sx Class 'G', 300 sx Intermediate 11847' 9-5/8" PF 'C' 11877' 9382' Scab Liner 11604' 130 s~TXl-lite wat, 61 sx 7-5/8" c~ass~,ANNE~ ~'~,~¥ ~ ~ 200311630' 9205' Perforation depth: measured Open Peffs 11064'-11084', 11090'-11145', 11160'-11190', 11194'-11234', 11340'-11360'. Sqzd Perfs 11264'-11320', 11328'-11330', 11423'-11425'. true vertical Tubing (size, grade, and measured depth) Open Perfs 8816'-8831', 8836'-8876', 8887'-8909', 8912'-8941', 9019'-9034'. Sqzd Perfs 8963'-9004', 9010'-9012', 9080'-9081'. RECEIVED 4-1/2", 12.6#, L-80 TBG-PC @ 11037' MD. 5 Packers & SSSV (type & measured depth) 4-1/2" BKR PBRw/GBH SEALASSY @ 10904'. MAY 0_ 7-5/8" x 4-1/2" BKR SAB PERM PKR @ 10929'. 4-1_~~.~%.,~y,,N~p, pI. Le._.~__.2199'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 04/06/2003 Subsequent to operation 04/23/2003 Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure 4805 5252 Tubing Pressure 1545 1557 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended __ Service WAG INJECTOR 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DeWayne R Schno Form10.404R~l~ev?(~/1M5/~88b~F~ ~!~,~ ORIGINAL Date April 241 2003 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE 04/06~2003 04/08/20O3 04/09/20O3 04/10/2003 04/11/2003 04/18/2003 04/23/2003 03-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR SCMOO-B-GONE--SBG: SCMOO-B-GONE ANN-COMM (AC-EVAL AND REPAIR): AC-MITIA ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR TESTEVENT--- INJECTION PRESSURE, PSI: 1,557 TYPE: PW VOLUME: 5,252 BPWD. EVENT SUMMARY O4/O6/O3 04/08/03 O4/O9/O3 04/1 O/03 04/11/03 04/18/O3 O4/23/O3 TIO:1520/610/600 IA FL (Pre MITIA). IA FL @ SURFACE. SCHMOO-BE-GONE TREATMENT; PUMPED 202 BBLS 16% SCHMOO-B-GONE MIX FROM SKID DOWN FL & TBG. FLUSH/FP MEOH LINE ON SKID W/5 BBLS MECH. TURNED WELL OVER TO DSO FOR 3 HOUR SOAK. T/I/O = 1460/500/750/540 TEMP: HOT. MITIA PASSED TO 3500 PSI. (PRE MI INJECITON) IA FL @ SURFACE. LRS PRESSURED IA UP TO 3500 PSI (5 METHANOL). CA (9-5/8") INCREASED TO 1300 PSI AND OOA (13-3/8") INCREASED TO 560 PSI. IN FIRST lSMINUTES.IA LOST 90 PSI (CA DECREASED 100 PSI AND OOA INCREASED 20 PSI). IN SECOND 15 MINUTES IA LOST 20 PSI (CA DECREASED ANOTHER 100 PSI AND OOA INCREASED ANOTHER 40 PSI) FOR A TOTAL OF 110 PSI IN 30 MINUTES. BLED IA BACK TO 900 PSI (CA DECREASED TO 600 PSI AND OOA REMAINED AT 620 PSI). FINAL WHP's: 1460/900/600/6;~oc,~NNF~ ~¥' '~ :~ TIO=1500/1150/720/720 TEMP = 110 MONITOR WHP's (POST MITIA). lAP INCREASED 250 PSI. CAP INCREASED 120 PSI. OOAP 100 PSI OVERNIGHT. TIO=1500/1150/720/720 TEMP = 110 MONITOR WHP's (POST MITIA). NO CHANGE WITH lAP. T/I/11/O=1500/1100/820/740 MONITOR WHP's. CA FL NEAR SURFACE. TESTEVENT--- INJECTION PRESSURE, PSI' 1,557 TYPE' PW VOLUME' 5,252 BPWD. Fluids Pumped BBLS 11 METHANOL 202 SCHMOO-B-GONE 213 TOTAL Page I 1' MEMORANDUM TO: Julie Heusser '/t'~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: July 22, 2001 SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder _ ~ ~_ BPX Petroleum Engineer~"~ _~~"~ r~\ Ddllsite 3 ~"' ~-'~'-' 13& 18 FROM: Lou Grimaldi ~,3\'-( Prudhoe Bay Unit Petroleum Inspector Pmdhoe Bay Field NON- ,,CONFIDENTIAL ....... Packer Depth prel~st InilJ~ 15 Min...30 Min:, w.fl'...3.~3 ITyp~,.j.'! ~._ '1 T.V.D. I .s6~. ITu~! '~0 I ~600'1 ~6001 ~580 I'~.~al .4 p:T,D.~ 179-071ITypetestl P. IT~P~I 2174 'lca~,gl. ~00 I ,2500 I 24.q0,1. 2.4~. ! .P/F I_~ ' '.W,~l '3-~'s ITypelnj. I ' F' I'T.V.D. i 7477' I T~ngl 1260"1 15a01 !5$0.I 1550 .linu~h~al 4 P..?.D.I .~7~.~o~ IT~ta.tl ~, ITe*tp~,l ~,. i .Ca~.'n01 ~','1.,,2~00 I,~ I =~0 I ,P,~=, I P Type INJ. Fluid Cedes F = FRESH WATER INJ. G = GAS INJ S = SALT WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Rad;oactive Tracer Survey A= Temperature Anomaly Survey lntenml I= Initial Test 4= Four Year Cycle V= Required by Vadance W= Test during Workover D= Differential Temperature Test O= Other (describe in notes) Tast'e Details The crew was ready to test when I arrived. Two wells (3-13 & 3-18) were tested today. Both passed their MIT's. The tree on 3-13 was dirty with what appeared to be crude oil on the exterior. The containment barrel for the SVS panel was dented and seemed to be in less than good condition. I spoke with the Lead DSO and spoke with him about these conditions. I will make a return inspection on this pad on my next tour (two weeks) to check on progress. M.I.T.'s performed: 2 Number of Failures: None Total Time during tests: ,3, houm Attachments: Well. S,,,chematics (2) c~; Ande ,rlgYga0er (BPX PB,U well, int,) MiT report form 5/12/00 L.G. MIT PBU DS-3 7-22-01 LG.xls 7/23/01 STATE OF ALASKA ALAS(.,, OIL AND GAS CONSERVATION'uOMMISSION REPORT OF SUNDRY WELL OPERATIONS Operations performed: OperatK)n shutdown Stimulate Plugging Perforate Pull tubing --. Alter casing ~ Repair well ~ Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Locabon of well at surface 847' FSL, 912' FWL, Sec. 11, T10N, R15E, UM At top of productNe ~nterval 1769' FSL, 695' FEL, Sec. 14, T10N, R15E, UM At effective depth 1367' FSL, 342' FEL, Sec. 14, T10N, R15E, UM At total depth 1321' FSL, 300' FEL, Sec. 15, T10N, R15E, UM 5. Type of Well Development Exploratory St rat~graph~c Service X 6. Datum of elevation(DF or KB) 64' RKB 7. Umt or Property Prudhoe Bay Unit 8. Well number 3-13i 9. Permrt number/approval number 79-71 10. APl number 50 - 029-20399 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth- measured 11925 feet Plugs(measured) Cement Plug Tag @ 11308' MD (11/27/96) true vertical 9416 feet Effective depth' measured 11308 feet true vertical 8291 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 500 sx AS cmt 80' 80' Surface 2696' 13-3/8" 6114 sx PF cmt 2729' 2713' Production 11847' 9-5/8" 1500 sx CIG & 300 sx PF 'C' 11877' 9382' Liner 11604' 7-5/8" 130 sx TXl-lite wgt & 61 sx CIG 11630' 9205' Perforation depth: measured 11064-11084', 11090-11145'; 11160-11190'; 11194-11234'; 11264-11308' true vertical 8820-8834'; 8835-8876'; 8887-8909', 8913-8941'; 8963-8291' Tubing (size, grade, and measured depth) 4-1/2", 12 6#, L-80, PCT @ 11037' MD Packers and SSSV (type and measured depth) Otis 'HRQ' SSSV @ 2199' MD; Baker 'SAB' Packer @ 10929' ~rMD, 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure ORIGINAL Alaska Oil & Ga~ Cons. Comn' 14 Prior to well operation Subsequent to operation Representabve Dady Average Production or Inlection Data Od-Bbl Gas-Md Water-Bbl Casing Pressure 8862 9709/ Tubing Pressure 1800 1801 15 Attachments Cop~es of Logs and Surveys run Daily Report of Well Operations ~ 16. Status of well classification as: O~1 Gas Suspended Service Injector 17. I hereby certify that the foregoing ~s true and correct to the best of my knowledge Si g n e d '~~ I~. '~u"-'~ F~ g--]~ ¢~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date ~2./?_"~ SUBMIT IN DUPLICATE 3-13i DESCRIPTION OF WORK COMPLETED CEMENT RETAINER SQUEEZE FOR INJECTION PROFILE MODIFICATION 6/6/96: RIH & tagged PBTD at 11546' MD. 9/2/96: RIH w/CT to tag PBTD, then PU & pumped 46 bbls of gelled sand slurry containing 9000 lbs of 20/40 mesh sand, to place an isolation sandplug across the lower open Z4 injection thief perforation interval located at: 10340 - 10360' MD (Z4) Ref. Log: BHCS 11/25/79. Dressed off final sandplug top to 11375' MD POOH w/CT. Rigged down. 10/24/96: RIH & tagged TOS at 11313' MD. I I/3/96: RIH w/CT & reversed out top of sandplug to 11380' MD in preparation for squeeze. I I/4/96: RIH & tagged TOS at 11384' MD. 11/24/96: Performed a Cement Squeeze w/Retainer for Injection Profile Modification as follows. MIRU CTU & PT equipment. RIH w/cement retainer & inflated to set at 11330' MD. Pumped a pre squeeze acid wash down CT & through the retainer to treat the lower open perforation interval (above). Pumped: a) 20 bbls Xylene, followed by b) 26 bbls 12% HCl w/10% Xylene, followed by c) CT volume of 1% KCI Water Flush Swapped over to pumping Latex Acid Resistive Cement, to squeeze the open perforation thief interval (listed above) located below the retainer. PU off retainer & pumped cement on top of retainer to 10310' MD to cover additional open perforations at: 10310 - 10320' MD (Z4) Ref. Log: BHCS 11/25/79. Pumped a total of 33 bbls of Latex Acid Resistive Cement & attained 1640 max whp dunng squeeze. POOH w/CT Rigged down. I I/27/96: RIH & tagged top of cement plug at 11308' MD. Returned well to produced water ~njection & obtained a valid injection rate Well: 03-13 Spud Date: 11-5-79 Original RKBE: 64' Top of Formation: 11060' Annular Fluid:Diesel/8.5 SW Reference Log:BHCS Alaska, Inc. - Prudhoe B~_ API #: 50-029-20399-00 Completion: 4-16-90 Hanger Type: 4-1/2" FMC Gen IV Max Hole Angle: 49° @ MD: 10000' Date: 11-25-79 Tie In: PFC Type:INJECTOR Status:Workover Hanger:26' Angle @ TS:42° Angle @ TD:43° Date: 4-28-90 ALL DEPTHS ARE RKB J-1 J -2,3 J-4 J -5,6 P-1 0-3 DRILLING MD TO TOP OF EQUIPMENT EXCEPT WHERE Jewelry (J) DeDth DescriDtion 1 2199' 2 10904' 3 10929' 4 11025' 5 11037' 6 11038' 10996' 4-1/2" Otis H~Q SS.q; Nipple ID=3.813" 4-1/2" Baker PBR w/GPH Seal Assenbly 7-5/8" x 4-1/2" Baker SAB ~ Packer 4-1/2" Otis XN Nipple ID=3.725" 4-1/2" Baker Shsarout Sub W/L Re-entzy Guide 4-1/2" Tubirg Tail ELM Tubing Tail (Lo~ 04/28/90) NOTED. Min ID: 4-1/2" Otis XN Nipple ID=3.725" Casing and Tubing (C) Size Weight Grade 1 13-3/8" 729 L-80 2 9-5/8" 47# S-95 3 7-5/8" 29# L-80 4-1/2" 12.6# L-80 Top Bottom Description 0' 2729' BIC Casing 0' 11877' BTC Casir~ 0' 11630' Liner-Scab 0' 11037' Tubirg-PC Perforation Data (ELM DEPTHS) (P) Interval Zone FT SPF 1 11064-11084 4 20 1 11090-11145 4 55 4 11160-11190 4 30 4 11194-11210 4 16 4 11210-11214 4 4 10 11214-11230 4 16 11 11230-11234 4 4 5 11264-11275 4 11 0 1/2 11275-11280 4 5 6 11280-11314 4 34 10 1/2 11314-11315 4 1 10 11315-11320 4 5 4 11328-11330 4 2 0 11340-11360 4 20 10 11423-11425 3 2 0 Date Comments 04-28-90 RPS~F 04-28-90 ~ 04-28-90 RPERF 04-28-90 RPERF 12-10-95 APERF 12-10-95 RPERF 04-08-95 APE~F 04-28-90 RFSZF 12-10-95 APSZF 12-10-95 RPERF 12-10-95 RPERF 04-08-95 A35RF 04-28-90 SQZ 12-10-95 RtSRF 04-28-90 SQZ Datum 8700' SS=10993' MD 8800' SS=11129' MD PEII~l1550 ' TD=11925' Revision Date: 12-13-95 by BMJ Reascn: RPE~ Previous Reascn: 04-12-95 Well 03-13 C-2 GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 1O177 Company: Alaska Oil & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 5/7/96 Field: Prudhoe Bay Anadrill Anadrill Anadrill Well Job # Log Description Date BL RF Sepia Survey Program Performance Calculation Letter D'i'S. "1-15 -- 78'-00 7 TUBING CUT R~:CORD 951223 1 1 , , D.S. 1-22A qJ"-/J'~"~ IBPSE'I-rlNG RECORD 951026 1 1 D-S. 2-11 . ? l- 0 ~ ] PROD PROFILE 96041 9 I 1 D.S. 3-11 ?q.-0q"/ FERFRECORD 951224 1 1 ... D.S..3-13 ?q"~)'/! ... PERFRE..CORD .... 951210 1 1 D.S. 5-06A q~"- 0(~'! POGLM SE'Iq'lNG [{~:CORD 951 030 I 1 D.S. 5-06A q~"-0¢~ TUBING PUNCHER RECORD 951 026 I 1 -D.S. 5-23 ~q-' e'~ ! PErlF RECORD 951020 1 1 , , D.S. 6-19 ~,l.-tl.,-/ CHEMICAL CUTTER RECORD 960420 I 1 ,, __ -D.S. 6-24 ~.--~.1 i F'ERFRECORD 951 226 I 1 ,, -- D.S. 6-24 -- }"~,-~ ,4'/ PERFRECORD 960423 I 1 D.S. 9-17 __ ~ '77.:63,g PERFRECORD 960422 I 1 D.S. 9-17 '7 7"~ INJECTION PROFILE 960422 I I ,. ,,, D.S. 9-18 ?)-0~lt_ PERFRECOBD .. 951208 I 1 D.S. 9-25 11'-( "(~Z~ PERFRECORD 951208 1 1 ., D.S. 9-36C ~}--I{'( PATCH SETTING RECORD 951 21 6 I 1 D.S. 9-36C .qr-(IH ~ PERFRECO.RD 951 022 I 1 D.S. 9-38 ~t- 0~, ~ PERF RECORD 951 20 9 I 1 D.'S. 12-15 ~ ,,1- 0J,),. INFLATABLE BRIDGE PLuG 951020 1 I . .. SIGNED' ___. ~~_J~~_ ........................................... ~l,~/ DATE: Please sign and return one copy of this transmitta! to Sherrie at the above address. Thank you. ^l,,.'?.~ka tli~ & G~ls Cons. (.,;m' ,;issi0n GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9984 Company: 1/12/96 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk ~.s. ~-~ ~~ ,~c,.o.~ ~s~ ~ ~ D.S. 5-6A DUAL BURST TDT-P (BOR~ INJEC) 951 229 I 1 D.S. 6-19 ~ ~/(~ LEAKD~EC~ON 951215 I 1 D.S. 7-25 8~~~ CBT 951217 I 1 D.S. 11-3A ~ / DUAL BURST TDT-P (BOR~ INJEC) 951 2 2 8 I 1 D.S. 2-13A ~'1~ 95354 DUAL BURST TDT-P (BORAX) 951030 C I .~ SIGNED' RECEIVED ,JAN 12 1996 AID~'~aT~ii & Gas (;on$. c.,ommi~iorl Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALASKAJ '.AND GAS CONSERVATION C~r VllSSION REPORT L,F SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate X 7. Unit or Property '"'~// 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 847' FSL, 912' FWL, Sec. 11, T10N, R15E, UM At top of productive ~nterval 1769' FSL, 695' FEL, Sec 14, T10N, R15E, UM At effechve depth 1367' FSL, 342' FEL, Sec. 14, T10N, R15E, UM At total depth 1321' FSL, 300' FEL, Sec. 15, T10N, R15E, UM 12 Present well condition summary Total depth: measured true vertical 11925 feet 9416 feet 5. Type of Well Development Exploratory Stral]graph~c Prudhoe Bay Unit 8. Well number 3-13i 9. Permit number/approval number 79-71 10. APl number 50 - 029-20399 11. Field/Pool Prudhoe Bay Oil Pool Plugs(measured) PBTD Tagged @ 11523' MD (4/7/95) feet Effective depth: measured true vertical Casing Length Conductor 80' Surface 2696' Production 11847' Liner 11604' 11523 feet 9141 feet Junk(measured) Size Cemented Measured depth 20" 500 sx AS cmt 80' 13-3/8" 6114 sx PF cmt 2729' 9-5/8" 1500 sx CIG & 300 sx PF 'C' 11877' 7-5/8" 130 sx TXl-lite wgt & 61 sx CIG 11630' True vertical depth 80' 2713' 9382' 9205' Perforation depth: measured 11064-11084'; 11090-11145'; 11160-11190'; 11194-11234'; 11264-11320'; 11340-11360' true vertical 8820-8834'; 8835-8876'; 8887-8909'; 8913-8941 '; 8963-9004'; 9019-9034' Tubing (size, grade, and measured depth) 4-1/2", 12.6¢t, L-80, PCT @ 11037' MD Packers and SSSV (type and measured depth) Otis 'HRQ' SSSV @ 2199' MD; Baker 'SAB' Packer @ 10929' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached JAN 0 4 1996 Treatment description including volumes used and final pressure 14. Representative Daily Average ~0r Inj~i0n Data ............ OiI-Bbl Gas-Md Water-Bbl Casing Pressure ~~~g Pressure Prior to well operation .... 14074 -- 1789 Subsequent to operahon 15338 -- 1786 15 Attachments Cop~es of Logs and Surveys run Daily Report of Well Operations 16. Status of well class~hcat~on as' Oil Gas Suspended Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. S,gned (~~ t~.~~ ~,~.~q T,tle Engineering Supervisor Form 10-404 Rev 06/15/88 cc KZ, JWP Date //Z.,/~ SUBMIT IN DUPLICATE 3-13i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 12110195' MIRU & PT equipment. Reperforated' RIH w/perforating guns & shot 80' of reperforations as follows: 11210 - 11230' MD (Z4) 11275 - 11315' MD (Z4) 11340 - 11360' MD (Z4) Ref. Log' BHCS 11/25/79. Shot all perforabons at 6 spf at 60 degree phasing w~th well overbalanced. Noted all shots fired. Rigged down. POOH w/perf guns. Returned the well to produced water injection & obtained a valid ~njection rate. JAN 04 Alaska Oil & Gas Cons. Commission Anchorage GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie RECEIVED Alaska 0ii & Gas cons. Commission Anchorage NO. 9431 Company: 4/26/95 Alaska Oil & Gas Cons Corem Attn' Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S 2-24 ~'~,-'7 ! CNT-D 040695 I 1 D:s, 3-13 ?~/- 71 PERFRECORD 040795 I 1 D,S. 3-13 PERF RECORD 040895 I 1 D.S. 4-13 '~ ~'- ;3 I INJECTION PROFILE 040795 I 1 D.S. 9-10 ~ ~- 3,~- PERFRECORD 040595 I 1 D.S. 9-12 '~ -'7 PERFRECORD 040795 I 1 !D.S. 9-23 ~ z./[ -.~ GAS LIFTSURVEY 040695 I 1 ID.S. 15-17 C~"g~ CNT-G 040595 I 1 ID.S. 18-24 ~c~, ~p,_~ !TBG. CUTTER RECORD 040695 I 1 ,, , SIGNED: __ __ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALASI~' OIL AND GAS CONSERVATION (' MMISSION REPOR'I OF SUNDRY WELL OPERATIONS 1 Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other ,,,, 2. Name of Operator ARCO Alaska, Inc. 3 Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 847' FSL, 912' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1769' FSL, 695' FEL, Sec. 14, T10N, R15E, UM At effecbve depth 1367' FSL, 342' FEL, Sec. 14, T10N, R15E, UM At total depth 1321' FSL, 300' FEL, Sec. 14, T10N, R15E, UM 5. Type of Well Development Exploratory Strat~graph~c 12 Present well condition summary Total depth RECEIVED measured true vertical APR 2 4 i995 Naska 011 & ~ Cons. Commission 6. Datum of elevation(DF or KB) 64' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-13i 9. Permit number/approval number 79-71 10. APl number 50 - 029-20399 11. Field/Pool Prudhoe Bay Oil Pool feet 11925 feet 9416 feet Effective depth: measured 11523 feet true vertical 9141 feet Plug~l~Jt~d) PBTD Tag @ 11523' MD (4/7/95) ORIGINAL Junk(measured) Casing Length Conductor 80' Surface 2696' Production 11847' Liner 11604' Size Cemented Measured depth 20" 550 sx AS cmt 80' 13-3/8" 6114 sx PF cmt 2729' 9-5/8" 1500 sx Class G & 300 sx PF 'C' 11877' 7-5/8" 130 sx TXl-lite weight & 61 sx Class G 11630' True vertical depth 80' 2713' 9382' 9205' Perforation depth: measured 11064-11084'; 11090'-11145'; 11160'-11190'; 11194'-11234'; 11264'-11320'; 11340'-11360' true vertical 8820'-8834'; 8835-8876'; 8887'-8909'; 8913'-8941 '; 8963'-9004'; 9019'-9034' Tubing (size, grade, and measured depth) 4-1/2", 12.6~, L-80, PCT @ 11037' MD Packers and SSSV (type and measured depth) Otis 'HRQ' SSSV @ 2199' MD; Baker 'SAB' Packer @ 10929' MD. .... 13 ~timulahon or cement squeeze summary Intervals treated(measured) See Attached Treatment descripbon including volumes used and final pressure 14 Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Od-Bbl Gas-Md Water-Bbl Casing Pressure 9283 Tubing Pressure 1832 12881 1828 15 Attachments Cop~es of Logs and Surveys run Dady Report of Well Operations 16. Status of well classification as Oil__ Gas _.... Suspended ..... Service Injector 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. S~gned ~ ~ . ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 cc KZ, JWP Date ,z/-/~'-~"' SUBMIT IN DUPLICATE 3-13i PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 4/7/95: MIRU & PT equipment. 20' of add perforations as follows: Added Perforations: 11340 - 11360' MD (Z4) Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing. overbalanced. POOH w/perf guns. Noted all shots fired. RIH & tagged PBTD at 11523' MD, then RIH w/perforating gun & shot Ref. Log: BHCS 11/25/79. Shot perforations while well was Rigged down. 4/8/95: MIRU & PT equipment. Reperforated: RIH w/perforating gun & shot 60' of perforations as follows: 11214 - 11234' MD (Z4) 11280 - 11314' MD (Z4) Added Perforations: 11314 - 11320' MD (Z4) Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing. overbalanced. POOH w/perf guns. Noted all shots fired. Ref. Log: BHCS 11/25/79. Ref. Log: BHCS 11/25/79. Shot perforations whde well was R~gged down. Returned the well to produced water injection & obtained a valid injection rate. APR 2 4 '~995 Oil & Gas Cons. Commission Anch0r~, ~, GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 9183 Company: 1/10/95 Alaska Oil & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 3-7 -7 ~" 6 ~'"~2~ STATIC BH PRESS SURVEY (12-11-94) I 1 D.S. 3-14 A TUBG CUTTER RECORD (12-11-94) I 1 D.S. 3-14 -' (~ STATIC BE PRESS SURVEY (12-11-94) I 1 D.S. 4-27 ~ ~"--"~.~ ~ STATIC aH PRESS SURVEY (12-14-94) I 1 D.S. 4-28 ~'_~ ::~--~'~T:) STATIC BH PRESS SURVEY (12-14-94) I 1 D.S. 4-44 ,c~ I~ ... b 'J'O DUAL BURST TDT-P (12-13-94) I 1 O.S. 4-45 ~/~-- (~_~ L~ DUAL BURST TDT-P (12-12-94) I 1 D.S. 5-16A C;j L~-~ I'Z~ 'TUBG PUNCHER & POGLM SETTING RECORD (12-13-94) I 1 D.S. 9-32 ~'3,-:---' J J~' !INJEC PROFILE (12-12-94) ,? I 1 D.S. 11-32 C/4~/--//~/ STATIC BH PRESS SURVEY (12-12-94) ' I 1 D.S. 15-40 ~ ~-- \'~ !PDC (12-11-94) I 1 D.S. 3-13 -~ C:I--O ~1 [ STATIC PRESS SURVEY (12-19-94) I 1 D.S. 4-20 ~ "~ I 1 D.S. 4-20 L) -P - ) I STATIC PRESS SURVEY (12-14-94) INJEC PROFILE (12-14-94) I 1 D.S. 5-33 '1, ~ T C3 ~'~7 PERF RECORD (12-19-94) I 1 D.S. 11-30 ~,D~ ~-(~ -~7 STATIC PRESS SURVEY (12-16-94) I 1 D.S. 12-27~I~ ~(- ~'~'~ INJEC PROFILE (12-21-94) I 1 D.S. 15-23 ~11 I~)~ DUAL BURST TDT-P (12-20-94) ' ' D.S. 15-23 I '~ PROD LOG (CT E-LINE) (12-1g-94) I 1 D.S. 16-21 <~ ~)'~,.,~ } ~ INFLATABLE BRIDGE PLUG SET RECORD (12-20-94) I ,~ I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. Schlumberger GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 9174 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 1/5/95 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar Floppy Disk ~ .,,,.S. 3-13 -'~ ~1 INJEC PROFILE (12-4-94) 1 1 D.S. 3-14 '7~ -- ~'=2:.. BACK-OFF RECORD (12-3-94) 1 1 D.S. 9-5A~".~ "~ 2~ .STATIC BHP SURVEY (12-9-94) 1 1 D.S. 11-24A ~"~ ~' :~2-O ~ PROD PROFILE (12-6-94) 1 .1 D.S. 14-9B ~, ~2--''~ O ~ ~ !PROD PROFILE (12-8-94) I 1 D.S. 14-24 ~_' '~.. ~C.~ PERF RECORD (12-6-94) I 1 D.S. 14-35 · ~ '.~'-' ~ ) ~ PROD PROFILE (12-7-94) I 1 O.S. 16-20 '~ '~"- ~ ~ PROD PROFILE (12-6-94) I 1 D.S. 17-2 ~" (~"~ (~ STATIC BE PRESS SURVEY (12-10-94) I I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: P.O.Box 100360 Anchorage. Alaska 99510 DATE: 5-15-92 REFERENCE: ARCO CASED HOLE FINALS t/- d/ 2-9 3-25-92 Prod Proffie Run 1, 5" ~'~-~ 2-18 4-28-92 Prod Profile Run 1, 5" ~Z-/o_~ 2-26 / 3-25-92 Prod Proffie Run 1.5" ?/-/~ 2-31 ~ 4-28-92 Prod Prattle R:m 1, 5" ~- ¢~' '3-11 ~ 4-4-92 InJ Profile Run'l, 5" ?~--?/ 3-13 ~ 4-4-92 InJ Profile R._n 1, 5" ?/-~' 4-3 ~ 4-6-92 Prod Profile R:m 1, 5" ~/~!~ 4-40 ~ 4-7-92 GR/~/J~ Run 1, 5" ?/~/~$ 4-42 ~ 4-27-92 Static Temperature R:,_,~ 1.5" ~-~'? 6-18 -~ 3-31-92 PITS~ R;m 1, 5" ?~//_ 7-3 / 4-7-92 Prod Proffie Run 1, 5" ?~TY 9-3 ~ 3-25-92 ProdProffie Run 1, 5" 7f~? 9-16 / 4-25-92 InJ Profile R;m 1,5" ? ~ ~ ~9-17 ~ 4-11-92 Collar R;m 1, 5" ~9-17 ~ 4-16-92 InJ Profile R;m 1, 5" ~/'/~/ 11-6 / 3-27-92 Prod Proffie R.n 1, 5" ?~-$~ 14-1 ~ 3-26-92 Leak Detect R,_m 1, 5" ~/~/~' 15-11 ~ 3-31-92 Prod Prof/Leak Detect R,m 1, 5" ~/~y/ 16-6 / 4-12-92 Jewelry R~_m 1, 5" Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco ,Camco Camco Camco Please sign and return the attached copy as receipt of data. Have A Nice Dayf ~]~ Sonya Wallace APPROVED Alas~"~as Cons. Commission ATO-1529 Trans# 92099' ~='-'-An~'horage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PtHLLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO ~'.u. T'~t% ~003,'..,0 A~,i--~ORAbE, ALAYI-,A ,'x9'.3 ~,) F'EFERENCE ARCO CAZED HOLE FINAl_"" ?~.-~'/ 2-':,v' ~,~-/~'° ~_ -~ / 2~._e~' ]_:~ ~ 9-~-~ ...... 8-2,;-9~ *~L'~, 2-~0 ,.-'" 9-4-9i ?,/-.~1 3-1 3 ~ 9--~ ~-91 ,t~'..~> 3;- t "'~,.~ 8-30-9 i ,~..-'~'='~'/L,. 3--1 7 ~ 9-'1 9-9i ,,-d *~ ,4,-4 ~ 8-3'~-9~ 7.¢-'''/'/ 4-7 ~'~ c,- :-91 8~,.:~' 4-'"9'"''~ o-~8-91 F'L_ RE. I Jl~ F'RE-FRAC INJ F'ROFZLE RUH PROD F'R,.JF £ LE R;Jr,' F'i 1 3 ~,:UN F'! T2. PUN GR/CCL RUN INJ PROFILE RUN 1NJ F'F'OF ILE RUN LEAK ~ETEC[ RU~ F'ROD F'ROFiLE RUN JEWELRY PUN INJ PPOF 1LE F'Ur-~ PRUO PRUFiLE RUN PROD PROFILE -.-:--:,- ~:~-:;.- -.---'-,,_~.---: :-.-~: --::.- RUN PROD F'F,'UF J: LE !;.'. ~J N F'ROD i-'RL~F I LE:' RLIN JEWEi_F' r, Gl,'/b,_L- FAG NUN F'I T£ R'UN LIEAK DIE rIscr F,:Ut,~ ! ,_ ~'" CAMCO 1 . 5 · I_'AmC 0 ~ , <" CAMLO 1 , 5" CAMCO t , 5" CAMCO ', , 5" CAm'30 1, 5 ~ CAML. O ~. 5" CAMCO ~, 5" CA~CU ~ , 5" CAmLO ~, 5" CAMCO £ONYA WALLACE ATO --~,_,_ '=" ':' Alask~ Oi.t & Gas Cons. commission '"' ..... ' .......... APF ROVED r--T-. TRAN,, ~ '~J~3; Dt3'TF'I'BUT] r_l t,J CENTRAL FILES CHEVRON D & m E,'. TEN."i UN k ;~ F LUr, ,~ t i tjl'J E) XON HAl<A1 HON, MOBIL ¢ PHiLLiPJ; F'B WELL FILES' ~,']A]I.: UF ALA,.FA TF.F AL 0 I I- ] ,i,_ I OF'i:' ;_C T AF' ]. ,~f F F~R ,.:- '-.-' FHE COR!'ECT AF'L~ F'OI,' 2-3o THE C. OF'EECi' AF'].¢ POI'( AF(CO ALASKA, £NC. p,O, I~OX i ANCHORAGE, ALASKA 995t8 DATE: 6-27-9t REFERENCE: ARCO CASED HOLE FINALS t-25 5-3t-7t LEAK DETECTION , 2-3 5-3t-9t PROD PROFILE 3-t3 5-3t-9t INJ F'ROFILE 4-t3 5-29-9t INJ PROFILE -33 6-8-9t CBT 9-8 5-3t -9t F'ERF BREAKDOWN 9-23 6-t-9t PROD pROFILE q/.~** ti-3 5-23-9t POST BREAKDOWN t6-9A 5-29-9~ GR-CCL PLEASE SIGN AND RETURN THE ATTACHED COPY RECEIVED BY .......... HAVE A NICE DAY! $ONYA WALLACE AT0-t529 RUN ~ , 5' RUN t, 5 · RUN t, 5 · RUN t , 5 · RUN t, 5' RUN t, 5" I:,:L.~N t, 5 · RUN t, 5" F:LIN i, 5" RUN t , 5' AS RECEIPT OF DATA- APF'ROVED °I'RANS~ 9 CAMCO CAMLO CAMCO CAMCO SLId AI'L.AS CAMCO CAMCO CAMCO CAMCO D I ST R I BLII' I ON CENTRAL FILES CHEVRON EXTENSION E. XF'LORAT ION EXXON MARATHON MOBIL F,H£LLIPS F'B WELL FILES R&D BF'X SLATE OF ALASKA TEXACO ."'THE CORRECTED API$ FOR 2-3 IS ~-~' ~ ** THE CORRECTED WELL NUMBER FOR THIS LOG IS t&-gA RECEIVED ,JUL 11991 Alaska Oil & Gas Cons. Commission Anchorage APCO aLAjkA. [NC~ / ~'~ P,O. BOx ',',,,,Sot-} ANCHORAGE, ~LA~RA ~95:0 RECEIVED O,aTE 9-20-9~ REFERENCE. ARCO CASED HOLE F~NAL'' Amslm O, & (las Cons. ¢ommmsmn Anchorage 2-1 1 :-3--Si -':'O TI E-iN 'E-t_Ir~E F-'LUG P'UU :-'".. ._ 9-2:: - ';' '-.,' PRODUCT [ r; t'l~, F'RUF .,.FLE fi"~"4_. , ]'~ F.. - o_ ' ";--o,~ F'RODLICTiOr.~ r. F Ur ,.,..,... [-, '...'t-~ ~-i $ 8-."2--'.:'0 !NJECTrON F'F'UFILE 5-]0 a-22-0.,:_~ F-'DODL,C ¥]'ON i-'ROF [I.F I-'IT-._: FL'~' ,~ -'"f; 0-- 5.-'-mO Y I'.-t,~l:, !;,I iFI , ... i i..s ,, ,2.,- 1 I 8-- ' 1 --mO G[< COPPELA T"[ ILIN P.'_'rJ · ,,-'~ ,, ,:-, '.---- o,:; COLLAR/F' E F.:F ~', · ...- .,..-? s .,, .- .~. ., ....a · ..... c:,_ ,:, -90 r-' ! T2 ,;' L,' t.I ~ -' ..'., O ' ,., , ,, '?-.,~ '~ '? --'~ 0-90 PEF,'F RI:'COF'.£, Rd,,'..1 ':' -- ~3 c;,_ ~ '5 -'-':'O C,OL!_F~R,' F'E':,:F RUN f"~ -7 ~-27-'-."~-':, [¢JECTTLIN PF'UI-': [LIE RUN · I ~--1:-:?, 8- 2?-00 F-'RODUC-['i'OF~ I-'i','L.IFi:L,_[ l.,'."~-i ~ 3-26 8--.Si-o0 GR CUF:PELAFFuN PUN i '4--S4 8--27-90 F'F;:.ODLJC] ]:Or! F'ROF' [L.E£ RUN F'!_[.'ASE &'Igr-J AND RETURN THE ATTACHED CtJl:"r AS RECE£F'T UF." ~)AFA., RECEIVED gf FtAVE A NICE DAY' O I STR I: BtJT ]: ON "' CENTRAL I"- ILE~ ir · ,-'"' CHI£VRON EXTENSION, EXF'LORATION EXXON MARATHON ~' MOBIL F'H ILL I!:'~' F'B WELL F!LES F< & D ,l: BF'X ,"' STATE UF T [-: ;,. F~E'O .- THE COPr'ECTEI) ~F'I~ FOR. 4-20 !~' _='0-029--20996. ~,- YHE CORRIECTED AF'I~ FuR 7-3.3 .[' 5.0-,1;'/..:9-2t809, I-' 0 ~Ll¥ t On_~6') . .L.A~k ANCI-IOR~GE " ~' ~ DATE 5-ii-90 F'E F: F.. F' E N C.' E ARCO CASE ~, -t n 5-7-on ,. _' 4-_ ~- 1% 4-27-c''A 2- t ~. 5:/4 -~,/~,'3 ") z C; C- '?gA 4- ~.,_.,- - 0 2-COA 5-6-°0 4- ~_... -0,5 6-4 4--n. 7-90 .6-9 4 t t-,°2 ~--4-90 i4-i7 '- 9-~-9~..3 i g--~ D 4-29-90 WG [-6 5- ?'-9,.'3 ' " RECEIVED D H 0 L E F I N A L 2 ~O~ge ~i~ion . POt L.A~' F'EP~ PEPOI;'D CCL F'F.F'F F'E COPh CCI_ PFC K[~LE'T BURTON ~TG PECliRD F'ERF R. ECORD PEPF RFCOPD 2EGHENTED BONO/GR/CCI. YER r [ LOG COLLAF'/F'EF'F F'LIN t PUN t F,'UN 1 PUN 1 RUN ~ RUN t RUN t, PI.IN t, RUN t, RUN i, RUN t , FI..E'-A,.~E 216N AND RETLIRN TH[-_" ATI~_.I~E'D C:F" .)F-Y Ag REC;EIF'T CIF DATA HAVE A NICE DAY' 2Ai..LY HOFFECKER AT[]- t 529 DISTRIBIJTION P.._.ENTR ~L.'" FILE2 CHEVRON D & H EXTEN2ION EXPL. ORATION EXXON MARATHON MOBIL · ~ F'HILLIF'2 F"B WELL FILE. 2 R & D -.-"" BPX ~ STATE OF ALASKA TEXACO STATE OF ALASKA ( , ALASKA OIL AND GAS CONSERVATION C.,OMIv,,SSION REPORT OF SUNDRY WELL OPERATIONS ORIGINAL 1. Operations Performed: Operation Shutdown m Alter casing X Repair well Stimulate Plugging __ Perforate Pull tubing X. Other ;X; Workover 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development --.. Exploratory Stratigraphic Service 4. Location of well at surface 847' FSL, 912' FWL, Sec. 11, T10N, R15E, UM At top of productive interval 1769' FSL, 695' FEL, Sec. 14, T10N, R15E, UM At effective depth 1367' FSL, 342' FEL, Sec. 14, T10N, R15E, UM At total depth 1321' FSL, 300 FEL, Sec. 14, T10N~ R15E~ UM 12. Present well condition summary Total Depth: measured 1 1 925' true vertical 941 6' 6. Datum elevation (DF or KB) 64' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number 3-13 feet 9. Permit number/al~proval number 79-71/ -715 r- 10. APl number ' 50-029-2(~39~) 11. Field/Pool Prudhoe Bay Field Prudhoe Bay O~1 Pool feet feet Plugs (measured) None Effective depth: measured 1 1834' true vertical 9350' feet feet Junk (measured) None Casing Length Size Structural Conductor 8 0' 2 0" Surface 2696' 1 3-3/8" Production 11 847' 9- 5/8" Liner 11 604 7-5/8" Perforation depth: measured 11064'-11084', 1 1 264'-1131 4' true vertical 8820'-8834', 8963'-9000' Tubing (size, grade, and measured depth) Cemented Measured depth True vertical depth 550 sx AS cmt 80' 6114 sx PF cmt 2729' 1500 sx Class G & 1 1 877' 300 sx PF 'C' 130 sx TXl-lite weight & 11630' 61 sx Class G 11090'-11145, 11160'-11190', 80' 2713' 9382' 9205' 11194'-11234', 8835'-8876', 8887'-8909', 8913'-8941', 4-1/2", L-80, tbg w/ tail @ 11038' Packers and SSSV (type and measured depth) Otis 'HRQ' sssv ~ 2200', Baker 'SAB' pkrs ~ 10930' 13. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED APR 3 o 199 Alaska Oil & Gas Cons. Commissloa ~ohora~l 14. N/A Prior to well operation Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Subsequent to operation Attachments *Workover Well History Copies of Logs and Surveys run __ Daily Report of Well Operations X* 16. Status of well classification as: Oil Gas ,,,, Suspended Service Water In!ector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 05/17/89 Title Drilling Analyst Date '~ 4'~'~) SUBMIT IN DUPLICATE ( ARCO Oil and Gas Company Well History - Initial Report - Dally Pml~lm and submit th/ "11#111 RIII~" on the first Wednesday after a well ~s spudded or workover operatlonl are Itarled Dally work prior tO I~uddlng Mmuld be summarized on the form g~ving mclus~ve dates only D,stnct ARCO ALAS ~1~11~ Freld PRUDHOE BAY Auth or W O .OAS3307 ICou.ty pa.s~ or ~H SLOPE Le~e orUn,t ADL: 28328 TI.e WORKOVER State API: 50-029-20399 Operator A~CO Spudded or W OA~pT {Date 04/08/90 I'°u' Date and depth as of 800 em 04/09/90 ( TD: 0 PB:11877 SUPV: LP 04/10/90 ( TD: 0 PB:11877 SUPV:LP 04/11/90 ( TD: 0 PB:11877 SUPV:LP 04/12/90 ( TD: 0 PB:11877 SUPV:RWO 04/13/90 TD: 0 PB:11877 SUPV:RWO 04/14/90 ( TD: 0 PB:11877 SUPV:RWO 04/15/90 ( TD: 0 PB:11877 SUPV:RWO Compl.t, .cord fo~X1!ib 1) 2) 5) I ^Rcow, 21. 7800 1600 H~°r status ,f awo 6) 7) The above is.correct && t For form p~reperet)~on and distrtbu'fion, see Procedures Manual, Section 10, Drilling, Pages 86 and 87 NU BOPE MW: 8.5 FSW MIRU NABORS 2ES. ACCEPT RIG AT 1600 HRS 04/08/90. BULLHEADED 8.5 PPG SEAWATER DOWN THE TUBING AND ANNULUS, SPOTTED 50 BBL HEC PILL AT PERFS. MONITORED TUBING AND ANNULUS, BOTH ON SLIGHT VACUUM. SET BPV. ND TREE, NU BOPE. DAILY:S78,659 CUM:$78,659 ETD:S78,659 EFC:$1,161,000 · RIH W/ PRT & SHOE - PU DP MW: 8.5 FSW FINISH NU AND TEST BOPE. POH AND LD 5-1/2" COMPLETION. MU PRT AND SHOE ASSY. PU DC'S AND DP AND RIH TO MILL PACKER. DAILY:S33,123 CUM:$111,782 ETD:S111,782 EFC:$1,161,000 LD PACKER AND TAILPIPE MW: 8.5 FSW FINISH PU DP AND TAGGED PACKER AT 10,827'. MILLED PACKER FREE. SPOTTED 3 - 50 BBL HEC PILLS. POH AND LD PACKER AND TAILPIPE ASSEMBLY. DAILY:S23,448 CUM:$135,230 ETD:S135,230 EFC:$1,161,000 DRILLING OUT RETAINERS MW: 8.5 FSW FINISH LD PACKER AND TAILPIPE. MU 8-1/2" MILL AND RIH, TAG FILL AT 11,432'. WASHED FILL TO 11,446' AND TAGGED RETAINERS. MILLED ON RETAINERS TO 11,448'. DAILY:S38,212 CUM:$173,442 ETD:S173,442 EFC:$1,161,000 POH W/ MILL MW: 8.5 FSW MILLED RETAINERS AND CLEANED OUT FILL TO 11650'. POH WITH MILL. DAILY:S26,818 CUM:$200,260 ETD:S200,260 EFC:$1,161,000 RUNNING 7-5/8" CASING FINISH POH WITH MILL. 7-5/8" CASING. MW: 8.5 FSW CHANGE OUT PIPE RAMS TO 7-5/8". RUN DAILY:S22,255 CUM:$222,515 ETD:S222,515 EFC:$1,161,000 TESTING BOPE MW: 8.5 FSW FINISH RUNNING 7-5/8" CASING TO 11,630'. PUMPED 210 BBLS 8.5 PPG OIL BASE MUD , 130 SX TXI LITE WT SLURRY, 61 SX CLASS 'G', DISPLACED PLUG WITH SEAWATER. SET 7-5/8" SLIPS, CUT OFF 7-5/8" CASING AND IN~T~'?~D PACKOFF AND ~U;ING HEAD. NU BOPEAND CHANGE OUT PIPE RAMS. TESTING BOPE. DAILY:S342,415 CUM:$564,930 ETD:S564,930 EFC:$1,161,000 Title D.,!.!!ing_ Sup~ AR30-459-1-D Number all daily well history forms consecuhvely as they are prepared for each well iPage no ARCO ,,nd Gas Company Daily Well History--Interim Iltltl~ctioaa This form is used dunng dnlhng or workover operations if testing coring or perforating show formation name ;n describing work performed Number all drill stem tests sequentially Attach description of all cores Work performed by Producing Section will be reported on "Interim' sheets until hnal completion Report official or representahve test on "Flael" form 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days or (2) on Wednesday of the week m which oil strlllg la set Submit weekly for workovers and following setting of oil string until completion District ARCO ALASKA INC. ICounty or Parish NORTH SLOPE IStale Lease or Un,t DS 3-13 AK F~eld PRUDHOE BAY rWell no Date and deptl~ as of 800 am 04/16/90 TD: 0 PB:11877 SUPV:RWO 04/17/90 TD: 0 PB:11877 SUPV:RWO The above is correct ~ For form ~reparahon and distribution Cornplet ..... d f ....c~ d~ ..... k ...... progress LD BHA MW: 8.5 FEW INSTALL WEAR BUSHING. RIH W/ 6-3/4" BIT AND SCRAPER. TAGGED CEMENT AT 11492' DRILLED MEDIUM TO HARD CEMENT TO FLOAT COLLAR AT 11550'. PUMPED EEC SWEEP AND DISPLACED WELL TO INHIBITED SEAWATER. POH AND LD DP AND BHA. DAILY:S37,011 CUM:$601,941 ETD:S601,941 EFC:$1,161,000 ND BOPE MW: 8.5 FEW FINISH POH LAYING DOWN DP, BIT AND SCRAPER. MU AND RAN 4-1/2" L-80, COMPLETION. FREEZE PROTECTED THE PERMAFROST INTERVAL WITH DIESEL. SET BAKER 'SAB' PERMANENT PACKER AT 10,930', (OTIS 'HRQ' SSSV @ 2200' & TT @ 11038') SHEARED PBR AND LANDED TUBING HANGER. PRESS TESTED ANN TO 3500 PSI - GOOD TEST. PRESSURE TESTED TUBING TO 3500 PSI - GOOD TEST. SET BPV. ND BOPE. DAILY:S131,972 CUM:$733,913 ETD:S733,913 EFC:$1,161,000 Drilling Supt. see Procedures Manual Section 10, Dnlhng, Pages 86 and 87 AR3B-459-2-B Number all daily well h~story forms consecutively IPage no as they are prepared for each well ARCO Oil and Gas Company Daily Well History-Final Report Inatructloaa Prepare and sul~ttt the "~11~_. IllI~HI'* mt ~ first Wednesday after allowable has been assigned or well ~s Plugged Abandoned or Sold "Final Report" should be lubmlttld lilt ~111~"~1 am lUll)ended for an indefinite or appreciable length of t~me On wort<overs when an official test rs not required upon completion, report g~MIIII~IIII~ t~ test data ~n blocks prowded The "Final R~rt" form may be uSed for reporting the ent~r~ operation if soace ~s avadalMI. - IAccounting State cost center code Dlstr~ct ICounty or Perish ~li~RCO ~[JI~S~ INC. I NORTH SLOPE F,eld Lease or Unit PRUDHOE BAY ADL: 28328 Auth or W 0 no IT~tle AS3307 I JWell no DS 3-13 WORKOVER API: 50-029-20399 21.7800 Operator IA R Co W I ~CO I Spudded or W O begun IDate ACCEPT I 04/08/90 Complete record for each day reported NABORS 2ES Date and depth as of 8 00 a rn 04/18/90 ( TD: 0 PB:11877 SUPV:RWO Iotal number of wells (achve or ~nacfwe) on this, DSt center prior to plugging and I bandonment of th~s well ou, I Prior status ]'i a w 0 1600 ~S ~0) RIG RELEASED FINISH ND BOPE. NU ~ TEST TREE. 1400 XRS 4-17-90. HN: 8.5 FSW SET BPV. RELEASED RIG AT DAILY: $19,462 CUM: $753,375 ETD: $753,375 EFC:$1,161,000 Old TD New TO I PB Depth I Released ng Date IKmd of r~g I Class;flcations (oil, gas, etc ) ~ Type complebon (single, dual, etc ) I; Producing method Official reservoir name(s) Potenhal test data Well no Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T P C P Water % GOR Gravity Allowable Effective date corrected S,gnat~ ~.~. ~)~ Title Ddllin. Sum see Procedures Manual, Section 10, Drilling, Pages 86 and 87 AR3B-459-3-C Number all daily well history forms consecutively as they are prepared for each we iPage no Dlvl.io~ of Atlantk:RIcMIMdCompany APR-i 1- '90 ID: POOL 102 TEL NO: 99875633?34 ~202 PO1 ( ''' ('r R.E, CEIVED vail ,q Drlllln LocajioN~ 0I Genital Tzlp Tank ?it Oaul. Flay Monico · T It N hr, u: 0~: ,_: ' __..Cilinl III; ~_: : ..... ~- :.-~' 2 __ - m -f~ tovmr XelIy~Temt Premmuto: ._..~_~_.._...._ hi! typm~Temt Premmure .... ~-~,,_~_ lnmida IOP._Z__Tomt hemmurm__..~'~___: ._ Choke Hmnifold~Temt ~remmurI ._~~,_ er-ii;-;~o~occ to - ppmtitor aa - IUpmrvlaoF lnmpecto Pipe Bli.d Rant ..... Choke LAne ~ ,Ivmm :5"~ ..... . ...... . . . v,lv, .-"~~ ' .o. Valve. /~ ' ~.~.R. , . ___ .__., .... --,__ -.- ~,,,,~ ~;,,._/:-:.-,- -...... :__- ::_: -- :_: :::... _-:. Chluk ~-- : -' -"-..J. .. ~_ ' ........... ~ydt~ute!!{{. {~t~ted_ ah~ki _..~ ............ , ....... Co~tmmion ..... ~=_ - ,. .... ~ .... ~ .............. ~ ..... , ~_ ~_ _-~ ~ ............ _ { --· ' ' ARCO Alaska, InY Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 10, 1990 Mr. John Boyle Alaska Oil and Gas Conservation Commission 3[]01 Porcupine Drive Anchorage, Alaska 99501 Dear John: Please cancel the following 14 Forms 403 for which no Forms 404 were wriffen. Per the drill-site engineers, this work has not been done and is no longer planned. D.S. A.D.~r. ~ Date Signed 1987 3-4 7-51 1/26/87 4-6 7-263 4/20/87 4-10 7-188 3/20/87 4-10 7-238 4/8/87 4-14 7-264 4/20/87 5-8 7-624 9/23/87 9-16 7-291 4/27/87 14-13 7-399 6/18/87 14-30 7-100 2/13/87 16-24 7-117 2/26/87 1988 3-9 8-826 11/2/88 3-13 8-854 11/17/88 6-13 8-316 4/28/88 9-34 8-864 11/21/88 Please coll me at 263-4310 if you have any questions concerning these Sundries. 'S. T, Hoffecke, t Reco/ds Pro~essor STH/ab/034 , J. L Glaeser - ATO 1528 ~ CC: RECEIVED ARCO Alaska, Inc is a Subsidiary of AtlantmcRichfieldCompany APR 1 I1 1990 ARCO. ALA£'KA, INC. F'.O. BOX 100560 ANCHORAGE, ALASKA DATE ' 4-4-90 REFERENCE' ARCO CASED HOLE FINALS t-t0 J-J1-90 COLLAR/F'ERF RUN t-26 J-25-90 COLLAR/F'ERF RUN t-34 5-2~-90 CNL-GR RUN 2-28 5-2~-9G COLLAR/F'ERF RUN 2-2~A 5-27-~G PROD. F'KR RUN 5-tJ 5-J8-9~ COLLAR/F'ERF RUN 5-t5 5--JO-gG COLLAR/PERF RUN 5-25 5-J~-~Q COLLAR/PERF RUN ~-t~ 5-25-~0 COLLAR/F'ERF RUN t4-26 J-2~-gG COLLAR/PERF RUN t5-4 5-22-98 CNL-GR RUN t6-~2 5-28-~ COLLAR/PERF RUN F'LEA£E ~IGN AND RETURN THE ATTACHED COF'Y AS RECEIPT OF DATA. RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-152~ APR - 6 lg90 Anchorage ATLA~ ATI_A~' A FL_AS~ Al' LA£ A [ L.A.~ All_A~ A-( LAS' AI'LA~ A FL.A.9 ATLAS' ATLAS AFLAZ DISTRIBUTION CENTRAL FILE~ ' F' ~ HILLIF'$ CHEVRON F'B WELL FILES D & M R & D EXTENSION EXF'LORATION ~ ~ BF'X EXXON $ STATE OF ALA~'KA MARATHON ~ ~ TEXACO MOBIL f STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS ORIGINAL 1 Type of Request Abandon __ Suspend __ Alter casing __ Repair well Change approved program __ Operation shutdown __ Re-enter suspended well __ Plugging __ T~me extension __ Sbmulate __ Pull tubing ~ Variance __ Pedorate __ Other 2 Name of Operator ARCO Alaska, Inco 3 Address P.0o Box 100360 Anchorage, AK 99510-0360 4 Locabon of well at surface 8~7' FSL, 912' FWL, Sec.11, T10N, R15E, UM At to p of prod ucb ve ~ nte rval 1769' FSL, 695' FEL, Sec.14, T10N, R15E, UM At effecbve depth 1367' FSL, 342' FEL, Sec.14, T10N, R15E, UM At total depth 1321' FSL, 300' FEL, Sec.14, T10N, R15E, UM 5 Type of Well Development Exploratory Strabgraph~c Serwce 6 Datum elevabon(DForKB) RKB 64' 7 Un~torPrope~yname Prudhoe Bay Unit 8 Well number 3-13 9 Permit number 79-71 10 APl number 50-- 029-20399 11 Reid/Pool Prudhoe Bay 0il Pool feet 12 Present well cond~bon summary Total depth measured true verbcal Effecbve depth measured true verbcal 11925'ND 9416'TVD 11834'ND 9350'TVD feet Plugs (measured) feet feet Junk (measured) feet Casing Structural Conductor Sudace Intermediate Producbon Liner Perforabon depth Length 80' 2696' 11847' S~ze Cemented measured None true verbcal None REL;EtVED AUG l ,,5 ),989 A!aska 0ii & Gas Cons, Commission Measured depth Al~~al depth 20" 550 sx AS cmt 80'MD 13-3/8" 6114 sx PF cmt 2729'MD 9-5/8" 1500 sx Class C & 11877'MD 300 sx PFC 11064'-11084'MD, 11090'-11145'MD, 11160'-11190'MD, 11194'-11234'MD 11264'-11314'MD 8820'-8834'TVD, 8835'-8876'TVD, 8887'-8909'TVD, 8913'-8941'TVD, 8963'-9000'TVD Tubng (size, grade, and measured depth) 5-1/2', L-80, tbg w/tail ~ 10955' 80 ' TVD 2713 ' TVD 9382'TVD Packers and SSSV (type and measured depth) CAMCO 'Bal-0' SSSV ~ 2214', Baker 'FB-I' pkr (~ 10839' 13 Attachments Descnpbon summary of proposal j~_ Detaded operabons program __ BOP sketch 14 Esbmated date for commencing operabon December 15, 1989 16 If proposal was verbally approved Name of approver Date approved 15. Status of well classification as' Od __ Gas __ Suspended __ Serwce Water Injector 17. I hereby certify that the foregoing ~s true and correct to the best of my knowledge. Signed (~ ~/V~J~,./~ Title Drilling Analyst FOR COMMISSION USE ONLY Cond~bons of a )royal. Nobfy Commission so representatwe may wmtness Plug ~ntegnty __ BOP Test ~ Locabon clearance i ,,~ Mechan cai I ntegr ty Test __ Subsequent form required 10-_.~ Original Signed By , _. 0..96/SA4 David W. Johnston Approved by oroer of the uomm~ss~on Date I Approval NO. ¢ ...'~/(,~'"" Commissioner Approved Copy Returned Date ~ .\-~ ._~:~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ~, DS 3-13 WORKOVER ( PR'k'Tr,TNXINARY PRCCEDURE Pull the 5-1/2" tubing. Mill and retrieve the FB-1 packer. Run and cement 7-5/8" casing from PBTD to surface. Re-perforate and set a 7-5/8" x 4-1/2" packer and complete with 4-1/2" tubing. . Have Production freeze protect the tubing string to +2200' MD with methanol-water via the manifold building. . MIRU E-line unit. Tag fill and perforate the 5-1/2" tubing at +10800'MD. . MIRU AUDI 94. Kill and displace the well with 8.5 ppg seawater. Pump H~C pills as required to control fluid loss. A bridgesal pill may be required if fluid loss is excessive. 4. ND tree, NU and test BOPE. 5. Pull and ID the 5-1/2" tubing and seal assembly. . PU PR~/mill and 3-1/2" DP. RIH, mill and retrieve the FB-1 packer at 10838 'MD. . RIH with an 8.5" bit and clean-out the 9-5/8" casing to PBTD @ 11,420' MD. (Note: This step may not be required depending on the tag depth in step 2. ) . RIH with 7-5/8" casing frcm +11420' to surface. Land the casing in the existing tubing spool. Cement the 7-5/8" casing. ND BOPE, NU new tubing spool, NU BOPE and test same. 0 RIH with a 6.75" bit and clean out to the float shoe. Pump the HEC sweep and displace the well with inhibited seawater. Pressure test the 7-5/8" casing to 2500 psi. POOH and IDDP. 10. RU E-line and run a 6.75" OD G~/JB to the new PBTD. Perforate the 7-5/8" liner opposite the Sadlerochit (+200' @ 6 SPF). Set a 7-5/8" packer and tailpipe assembly. RD E-Line. 11. Run a 4-1/2" IPC tubing string. Displace the well to inhibited seawater and freeze protect the permafrost interval. 12. ND BOPE, NU and test 4-1/2" tree. Release the rig. 13. Turn the well over to Production. Anticipated Bottomhole Pressure: 3850 psi Workover Fluid: 8.5 ppg seawater 065/LWK 13-5/8" 5000 PSI BOP STACK ANNULAR PREVENTER 6 PIPE RAMS 5 ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIIVE AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BLIND RAMS 4 TUBING HEAD 1.13-3/8" CASING HEAD 2.9-5/8" CASING HEAD 3.5000 PSI TUBING HEAD 4.13-5/8" - 5000 PSI BLIND RAMS 5.13-5/8' - 5000 PSI PIPE RAMS 6.13-5/8" - 5000 PSI ANNULAR BOP STACK TEST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3, CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5, INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI, 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES, TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES, BLEED TO ZERO PSI, 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR, 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY, DAM 8/4/89 REVISION OF11/21/86 BOP SCH (FOR:AUDI 4,NORDIC 1, NAB 2ES) STATE OF ALASKA COM Mf,.~,tON A ~I~,.SKA OIL AND GAS CONSERVATION APPLICATION FOR SUND APPROVALS 1 Type of Request Abandon __ Suspend __ Alter casing __ Repair well __ Change approved program __ Operabon shutdown __ Re-enter suspended well __ Plugging ~ Time extenmon ~ Sbmulate m Pull tubing x Vanance __ Perforate ~ Other 2 Name of Operator ARCO Alaska, Inc. 3 Address P. 0. Box 100360, Anchorage, AK 99510 4 Location of well at surface 5 Type of Well 0360 847' FSL, 912' At top of producbve ~nterval 1769' FSL, 695' At effecbve depth 1367' FSL, 342' At total depth 1321 ' FSL, 300' FWL, Sec.ll, TION, R15E, UM FEL, $ec.14, TION, R15E, UM FEL, 5ec.14, TION, R15E, UM FEL, Sec.14, TION, R15E, UM Development Exploratory Strabgraph~c Serwce 6 Datum elevation (DF or KB) RKB 64 ' 7 Umt or Property name Prudhoe Bay Unit 8 Well number 3-13 9 Permit number 79-71 10. APl number 50-- 029-20399 11 Field/Pool Prudhoe Bay Oil Pool 12 Present well cond~bon summary Total depth measured true vertical 11925 ' M D feet Plugs (measured) 941 6 ' TVD feet 11420' (TOC current PBTD) Effective depth measured true verbcal 11 834 ' M D feet Junk (measured) N o n e 9350 ' TVD feet Casing Length Structural Conductor 80' Surface 2696 ' Intermediate Producbon 11 847 ' L~ner Perforabon depth measured S~ze Cemented Measured depth True vertical depth true vertical 20" 550 sx AS 80'MD 13-3/8" 6114 sx Permafrost 2729'MD 9-5/8" 1500 sx Class G & 300 sx Permafrost 11877'MD 11064'-11084', 11090'-11145' 11160'-11190' 11194'-11234' 11264'-11314' 8820'-8834', 8935'-8876', 8887'-8909', 8~13'-8941 ' 8963'-9000' Tubing (s~ze, grade, and measured dept ) ' 5-1/2", 17#, L-80~ tubing f/0-10955' Packers and SSSV (type and measured depth) Baker FB-1 okr ¢ 10838'. Camco Bal-O SSSV (~ 2214' 13. Attachments Descnpbon summary of prop°sal .~_ 80'TVD 2714'TVD 8683'TVD RECEIVED feet NOV 16 1%3 Alaska Oil & Gas Cons. Commission ,,~ ~ch0rage~ Detaded operabons program ~ BOP sketch X, 14. Esbmated date for commencing operabon J 15. Status of well class~flcabon as I i~r~mh~r 213 lc~RR 16 If proposal was Ve~'bally approved' O~1 ~ Gas __ Suspended __ Name of approver Date approved Service 17 I hereby cerbfy, that the_forego, ng ,s true and correct to'the best of my knowledge ¢. 1 /J_-...-~- S~gned //./'~ ~ Title Regional Drilling Engineer Date - / . FOR COMMISSION USE ONLY f LWK ) SA~/79 Condlbons of approval Nob~ Commission so representative may w~tness Plug ~ntegnty ~ BOP Test ~ Location clearance ~ ~ ~ Mechanical Integri~ Test ~ Subsequent form required 10- · Approved Copy Returned /..j -/ ~-~ Comm,ss,oner Date ORirp,^ ~ '~:-n BY LONN~E C Approved by order of the Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE D.S. 3-13 WORKOVER OBJECTIVE: Pull the 5-1/2" tubing, run an isolation packer assembly across a leaking FO in the 9-5/8" casing, run 5-1/2" tubing. 1) Fill tubing with seawater. Pull SSSV. Set extended prong plug in the XN nipple @ 10,938'. Set BPV. 2) MIRU Pool 102. ND tree. NU BOPE and test. 3) Pull 5-1/2" tubing. 4) PU and set 9-5/8" storm packer assembly. 5) ND BOPE. Change out tubing spool. 6) NU BOPE and test. 7) Retrieve storm packer assembly. 8) RIH with 9-5/8" x 7-5/8" permanent packer assembly and set just below the leaking F.O. at ±2480'. 9) PU and RIH with upper retrievable packer assembly. Sting into lower assembly and isolate F.O. by setting upper packer. 10) Test 9-5/8" casing to 2500 psi. 11) RIH with 5-1/2" tubing and space out. 12) Test tubing to 3000 psi. 13) ND BOPE. NU tree and test. 14) Release rig. Workover Fluid: 8.5 ppg seawater Anticipated Bottomhole Pressure: 3800 psi LWK/025.3 RECEIVED NOV 1 ~ 1983 Alasl~ Oil & Gas Cons..Commission ', Anchorage II ANNULAR PREVENTER PIPE RAHS BLIND RAHS 5 TUBIN6 HEAD 1. 16" CONDUCTOR SWAGED TO 10-3/4" 2. 10-3/4' CASING HEAD $. 5000 PSi TUBING HEAD 4. 15-5/8" - 5000 PSi PIPE RAHS $. 1~5-5/8" - $000 PSi BLIND RAHS 6. 1~5-5/8" - 5000 PSi ANNULAR ACCUMULATOR CAPACITY TEST I . CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL REEi:iVED BO P ST ACK TE~lsl~ Oil & Gas Cons. Comm~ion '~ ~chomge 1. FILL BOP STACK AND HANIFOLD ~ITH ARCTIC DIESEL. CHECK THAT ALL H~-~.~ SCR~ ARE FULLY RE~AC~': PREDETERHINE DEPTH THAT TEST PLU~ ~ILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD, CLUE ~NNULAR PREVENTER AND CHOKES AND BYPASS VALVE~ ON THE HANIFOLD, TEST ALL COHPOHENTS TO 250 PSI AND HOLD FOR 10 5. INCREASE PRE~SURE TO 1600 P~I AND H~D F~ 10 HINUTES. ~LEED ?0 ZERO ~EN ANNULAR PREVENTER ~ND CLOSE TOP SET OF PIPE RAHS. 7. INCREASE PRE~SURE TO 3000 PSI AND HOLD F~ 10 HINUTES. CLOSE VALVES DIRECTLY UPSTREAH ~ CHOKES. BLEED DOWNSTREAm1 PRESSURE TO ZERO PSI TO TEST VALVES. TEST REHAINING UHTESTE~ HANIFOLD VALVES, IF ANY, WITH 3000 PSI UPSTREAH OF VALVE AND ~ITH ZERO PSI D~NSTREA~. ~LEED SYSTE~ TO ZERO 9. OPEN PIPE RAHS. BACKOFF RUNNING JT AND PULL OUT OF HOLE CLO~E ~LIND RAH~ AND TEST TO ~000 PSI FOR 10 HINUTE~, ~LEED TO ZERO PSi 10. OPEN BLIND RAHS AND RECOVER TEST PLU~. HAKE SURE HANIFOLD LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLIN~ POSITI~ 11. TEST STANDPIPE VALVES TO 3000 PSI, 12, TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOHEY PUHP 15 ~ECORD TEST INFORHATION ON BLOW~T PREVENTER TE~T AND ~EHD TO DRILLIN~ SUPERVISOR. 14 PERFORH COHPLETE 5OPE TEST ONCE A ~EEK AND FUNCTIONALLY OPERATE ~OPE DAILY. JG dULY 28, 1986 (POOL 102) 1 Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ WATER INJECTOR 2 Name of Operator 7. Permit Number ARCO A]aska ~ I nc. 7~-71 3 Address 8 APl Number P. O. Box 100360, Anchorage, AK 99510 50- , 4 Location of well at surface 9 Unit or Lease N~me 847' FSL, 912' FWL, $ec.11, T10N, R15E, UN Prudhoe Bav Uni~ At Top Producing Interval 10 Well Number 1769' FSL, 695' FEL, Sec.14, TION, R15E, UN 3-12 ... At Total Depth 11 F,eld and Pool · 1321' FSL~, 300' FEL. Sec.15. TION~ R15E. UM . . Prudhoe Bay Field 5 Elevation m feet (~nd~cate KB, DF, etc ) [ 6 Lease Designation and Serml No Prudhoe Bay Oi ] Pool RKB 64'~ ADL 28~28 , . 12 Date Spudded 13 Date T D Reached 14 Date Comp, Susp or Aband. ~ 15 Water Depth, if offshore ~ 16 No of Completions 11/05/79 11/25/79 12/0~/79' . .J N/A feet MS L ~ 1 17 Total Depth (MD+TVD) 18 Plug Back Depth (M~D) 19 Directmnal Survey ~ 20 Depth where SSSV set ~ 21 Thmkn~s of Permafrost 11925'MD/9~16'TVD 11834'MD/9350'TVD YES ~ NO ~~ 2214 feet MDIi 22 Type Electric or Other Logs Run '-'~- ---' DIL/SP. BHCS/CAL/GR. FDC/CNI /C~l /~R_ CNI/CCL/0R CRI ~ ~vro, Vert~e 23 ' ' ' CASING, LI~ER ~ND-~EMENTIN~ ~-~CORD SETTING DEPTH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED r .......... rub , vv ~v ddV gA n~ ~111~ 1~-~/8' 72~ I-Rtl SUrf 2729' I71/2" ~111, ~. Dt~ , ,, i , r 24 Perforations open to Production (M'D~TVD of Top and Bottom and 25 TUBING RECORD ,nterval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 1106¢'-1108~ND/8820~-883¢~T~ (6 spf) ..... 5-'i/2" 10955~ 10839~ ' ' 11090~ -111 ¢5~ND/8835~ -8876~TVD (~ spf) 11160'-11190'MD/8887'-8909'TVD (4 spf) '"~6 ACiD,'FRACTuRE, cEMENT SQUEEZE, ETC " 11194'-11234'MD/8913'-8941 'TVD (4 spf) DEPTH'INTERVAL (MD~ 'AMOUNT & KIND OF'MATERIAL USED 112~'-11314'MD/8963'-9000'TVD (4 spf) N/A ..... , , 27 PRODUCTION TEST Date F~rst Production Method of Operation (Flowing, gas hft, etc.) N/A Flowino - C~nv~r~H ~n ~n,~~ ~, ~ ~. ~o.~ .... Date of Test Hours T~ted PRODUCTION F~R OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO l TEST PERIOD ~ , Flow Tub,rig cas',ng ~ressure CALCULATED OIL-BBL GAs-McF "W~TER-B~[ OIL GRAVITY-APl ~corr) ' Press 24-HOUR RATE ~ 28, , rCORE DATA Brief de~r~pt~on 0f'hthology, porosity, fractures, apparent d~ps and presence of oil, gas or water Submit core chips. /',~,.,~ None Anchc,~a * NOTE: Perforated wel 1 2/26/80. Converted to water injector 9/23/84. Added perforations 5/27/84. Workover performed 5/6/88. , ,, ,. ALASKA-OIL AND GAS CONSERVATION COMMISSION /~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG Form 10-407 (Dani) WC5/022 Submit ,n duphcate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29. [ 30. - GEOLOGIC MARK~I~S FORMATION TESTS NAME Include ~nterval tested, pressure data, all flu,ds recovered and gravity, MEAS DEPTH TRUEVERT DEPTH GOR, and t~me of each phase Top Sad1 erochi t, 11060 ' 8813 ' N/A Base 5ad1 erochi 1: 11792' 9350 ' 0WC 11 ~+18 ' 9075 ' · , 31 LIST OF ATTACHMENTS None 32 I hereby certify that the foregmng ts true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas ~njection, water injection, steam injection, air injection, salt water disposal, water supply for ~njection, observation, injection for in-situ combustion. Item 5' Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and ~n any attachments. Item 16 and 24: If th~s well ~s completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28. If no cores taken, indicate "none" Form 10-407 STATE OF ALASKA ALAS( OIL AND GAS CONSERVATION COMI( .SION REPORT OF SUNDRY WELL OPERATIONS 1 Operations performed: Operahon shutdown ~ Stimulate ~ Plugging ~ Perforate ~ Pull tubing Alter Casing ~- Other ~ W0RKOVER 2 Name of Operator ARCO Alaska~ Inc. 3 Address P.O. Box 100360, Anchorage, AK 99510-0360 4 Location of well at surface 847' FSL, 912' FWL, 5ec.11, TION, R15E, UM At top of productive ~nterval 1769' FSL, 695' FEL, 5ec.14, TION, R15E, UM At effective depth 1367' FSL, 342' FEL, Sec.14, TION, R15E, UN At total depth 1321' FSL, 300' FEL, 5ec.14, TION, R15E, UM 5 Datum elevahon (DF or KB) RKB 64 ' 6 Umt or Property name Prudhoe Bay Unit 7. Well number 3-1~ 8. Approval number 8-245 9. APl number 50-- 029-20399 10. Pool Prudhoe Bay Oil Pool Feet 11. Present well condition summary Total depth: measured true vertical 11925'MD 9416 'TVD Effective depth: measured 11834'MD true verhcal 9350'TVD Casing Length Size Conductor 80 ' 20" Surface 2696' 13-3/8" P roducti on 11847 ' 9-5/8" feet feet feet feet Plugs (measured) Junk (measured) Cemented 550 sx AS 6114 sx PF 1500 sx Class G & 300 sx PFC Fill @ 11311' N o ne Measured depth 80'MD 2729'MD 11877'MD True Verhcal depth 80 ' TVD 2714'TVD 8683 ' TVD Perforation depth: 8913'- 8941' Tubing (s~ze, grade and measured depth) 5½", L-80, tbg w/ tail ~ 10955' Packers and SSSV (type and measured depth) FB-1 pkr ~ 10839' & BAL-O 555V ~ 2214' measured 11064'-11084, 11090'-11145', 11160'-11190', 11194'-11234', 11264'-11314' true vertical 8820'-8834', 8935'-8876', 8887'-8909', , 8963'-9000' 12. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and hnal pressure 13. N/A Prior to well operation Subsequent to operahon Representahve Da~ly Average Produchon or Intechon Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14 Attachments (Workover ~11 History) Dmly Report of Well Operations Cop~es of Logs and Surveys Run [] 15 I hereby certify that the foregoing ~s true and correct to the best of my knowledge Signed ~,~ ~~ ~~ Form 10-404 Rev. 12-1-85 ~J - T~tle Associate Engineer (D~,,,;) 5W03/00 Date Submit In Oupllcat~ I~ ( ARCO Oil and Gas Company Well History - Initial Report- Daily Inatrugtiona' Prepare and submit the "Initial RelN~H" on the first Wednesday aftez a well ~s spudded or workover operations are started Da,ly work prior tO spudd,ng should be summarized on the form g,ving inclusive dates only District Field ~.CO Alaska, Inc. ICounty pansh or bOrough ' NORTH SLOPE BOROUGH-PUO Lease or Unit ~M)L: 28328 Title tK)RKOV~R PRUDHOE BAY FIELD Auth or W O no AS2203 ]sta~K DS 3-13 lwe. no Operator ~a~RCO Spudded or W O begun ACCEPT Date and depth as of 8 IX) am 04/24/88 ( TD:11925 PB:11834 SUPV:CD 04/25/88 ( TD:11925 PB:11834 SUPV:CD 04/26/88 ( TD=11925 PB:11834 SUPV:CD 04/27/88 ( TD:11925 ?B:11834 SUPV:CD 04/28/88 ( TD:11925 PB:11834 SUPV:RO 04/29/88 ( TD:11925 PB:11834 SUPV:RO API: 50-029-20399 IOate 04/23/88 IH°ur Complete record for each day reported POOL 102 1800 IARCO W I 22.0000 Prior status ~f a W 0 CIRCULATE MW: 8.5 SEAWATER MOVED RIG TO DS 3-13. RU TO KILL WELL. ACCEPTED RIG ~ 1800 HRS, 4/23/88. CIRCULATE AND KILLED WELL WITH SEAWATER. CIRCULATE BEFORE SETTING BP~. DAILY:S30,930 CUM:$30,930 ETD:S30,930 EFC:$665,000 RIH WITH JET CUTTER MW: 8.5 SEAWATER CIRCULATE. MONITORED WELL. CIRCULATE. SET BPV. ND TREE. NU BOPE & TESTED. SPEARED AND ATTEMPTED TO PULL TUBING. WAIT ON WIRELINE UNIT. RU SOS. RIH. CUT TUBING ~ 10756'. ATTEMPTED TO PULL TUBING - UNSUCCESSFUL. RIH WITH JET CUTTER. DAILY:S24,618 CUM:$55,548 ETD:S55,548 EFC:$665,000 TIH W/SPEAR MW: 8.5 SEAWATER CUT TUBING @ 7284'. SPEARED TUBING. CIRCULATE. LD 184 JOINTS OF 5-1/2" TUBING. CHANGED RAMS TO 3-1/2" & TESTED TO 5000 PSI. MU BHA. TIH. PU 3-1/2" DP. CUT DRILLING LINE. CONTINUED TIH. DAILY:S51,202 CUM:$106,750 ETD:S106,750 EFC:$665,000 TIH WITH OVERSHOT MW: 8.5 SEAWATER SPEARED FISH @ 7284'. WORKED TO 280,000# AND JARRED. ATTEMPTED TO ROTATE K- ANCHOR FREE. RELEASED SPEAR & POOH. RIH WITH 4-3/8" JET CUTTER. ATTEMPTED TO CUT TUBING @ 10578'. RD SOS. TIH WITH SPEAR. SPEARED FISH @ 7284', WORK AND JARRED FREE. POOH WITH 5-1/2" TUBING. CLEARED FLOOR. MU OVERSHOT & TIH TO RELEASE K-ANCHOR. DAILY=S40,426 CUM:$147,176 ETD:S147,176 EFC:$665,000 POH WITH PACKER MW: 8.5 SEAWATER TIH. PICK UP 3-1/2" DP. BREAK CIRCULATION AND WORK OVER FISH @ 10828'. RELEASED K-ANCHOR. POOH. MU PRT & MILL BHA; TIH. SLIP DRILL LINE. TIH TO 10850'. MILLED ON PKR. CIRCULATE HEC PILL. POOH WITH PACKER. DAILY:S31,349 CUM:$178,525 ETD:S178,525 EFC:$665,000 TIH W/BIT, SCRAPER MW: 8.5 SEAWATER POOH. NO RECOVERY. BREAK DOWN MILL PRT. MU TRISTATE SPEAR & TIH. TAGGED & SPEARED FISH @ 10405'. POOH WITH PACKER. RD TRISTATE. LD FISH. MU 8-1/2" BIT, SCRAPER, B. BASKET & TIH. DAILY:S33,397 CUM:$211,922 ETD:S211,922 EFC:$665,000 The above is correct For form preparation and di~r;'butlon, see Procedures Manual, Se~l~on 10, Drilling, Pages 86 and 87 ~ $'~ ]Title ENGINEER ARCO Oil and Gas Company 4~, Daily Well History--Interim Inltruclionl This form is used dunng dnlhng or workover operations If testing, coring, or perforat,ng, show formation name in describing work performed Number all drill stem tests sequenbally Attach description of all cores Work performed by Produc,ng Section will be reported on "Interim" sheets unhl final completion Report offlc,al or representat,ve test on "Flnll" form 1) Submit "lnlarim" sheets when filled out but not less frequently than ever/30 days, or (2) on Wednesday of the week m which o,I string is set Submit weekly for workovere and following setting of oil stnn§ until completion ARCO Alaska, Inc. I NORTH SLOPE BOROUGH-PUO F,eld ILease or Unit PRUDHOE BAY FIELD I DS 3-13 !Complete record for each day while dr,lhng or workover in progress POOL 102 04/30/88 ( TD:11925 PB:11834 SUPV:RO 05/01/88 ( TD:11925 PB:11834 SUPV:RO Date and depth asof 800 am 05/02/88 ( TD:11925 PB:11834 SUPV:RO 05/03/88 ( TD:11925 PB:11834 SUPV:RO 05/04/88 TD:11925 PB:11834 SUPV:RO 05/05/88 TD:11925 PB:11834 SUPV:CD TIH WITH BIT & SCRAPER MW: 8.5 SEAWATER FINISHED TIH TO 11060'. CIRCULATE BOTTOMS UP. SPOT HEC PILL @ 11060'. POH. LD JARS. RU DRESSER. RIH WITH GR/JB. UNABLE TO GET PAST 10420'. RD DRESSER & MU BHA. TIH. DAILY:S41,248 CUM:$253,170 ETD:S253,170 EFC:$665,000 RUN VERTILOG W/DRESSER MW: 8.5 SEAWATER TIH TO 11060', SHORT TRIP. POOH TO 10100'. CIRCULATE. TESTED LINES TO 3000 PSI. PUMPED 100 BBLS XYLENE/AMMONIA CHLORIDE WASH. LET SOAK 1 HR. DISPLACE WITH 100 BBLS SEAWATER. CIRCULATE 50 BBLS HEC PILL. POOH. RU DRESSER. RIH WITH GR/JB TO 10800' RIH WITH GR/JB TO 11100'. RIH WITH VERTILOG AND LOG FROM 11100'-SURFACE. DAILY:S45,932 CUM:$299,102 ETD:S299,102 EFC:$665,000 PU SINGLES & TIH MW: 8.5 SEAWATER RD DRESSER ATLAS. SLIP DRILL LINE. MU RTTS & TIH. TESTED 9-5/8" CASING TO 3000 PSI - OK. TIH TO 10849', SET RTTS. TESTED CASING TO 3000 PSI. CIRC. OUT XYLENE (TRACE). POOH WITH RTTS & LD SAME. CHANGED OUT RUBBERS ON 3-1/2" DP RAMS. MU 8-1/2" BIT & BHA; TIH. TAGGED UP @ 11318'. DAILY:S84,981 CUM:$384,083 ETD:S384,083 EFC:$665,000 TIH W/ PKR MW: 8.5 SEAWATER DRLD ON EZSV'S TO 11420'. CIRC BTM'S UP W/ HEC PILL. POOH AND LD BHA AND DC. SLIP DRL LINE. MU BAKER FB-1 PKR & TAIL ASSY AND RIH. DAILY:S37,372 CUM:$421,455 ETD:S421,455 EFC:$665,000 TIH MW: 8.5 SEAWATER TIH W/ BAKER FB-1PKR DROP BALL AND SET PKR @ 10835'. SHEAR OUT OF PKR W/ RUNNING TOOL. CIRC. TEST PKR TO 3000 PSI. OK. POOH W/ RUNNING TOOL. RIH W/ 19 STDS. LD 3-1/2" DP. RU GEARHART AND TELEDYNE CSG PATCH. RIH TO 2179' COULD NOT GET PAST 2179'. POOH W/ PATCH. WO MILL AND 8-1/2" TOOLS. MU BHA & TIH TO 2000'. DAILY:S25,046 CUM:$446,501 ETD:S446,501 EFC:$665,000 LD 3 1/2" DRILL PIPE MW: 8.5 SEAWATER LD 8 STANDS OF DP. RIH WITH 8 STANDS. REAM FROM 2088-2629'. CIRC HEC SWEEP. POOH LD BHA. RU GEARHART. RIH WITH CCL AND DUMMY GUN. MU MERLA 9-5/8" CASING PATCH. RIH WITH PATCH. COULD NOT GET BELOW 2179'. POOH LD GEARHART. TEST 9-5/8" CASING TO 2500 PSI FOR i HOUR. RIH WITH 3-1/2" DRILL PIPE. POOH. LD 3-1/2" DRILL PIPE. DAILY:S40,199 CUM:$486,700 ETD:S486,700 EFC:$665,000 Well no The above is correct Signature I Date For form preparation and d~sg~'b'ution see Procedures Manual Sect/qln 10, Dnlhng, Pages 86 and 87 ASSO~A~ ENGINEER ARCO Oil and Gas Company Daily Well History--Interim Inltl~Ctlonl This form is used dunng drilling or workover operations If testing, coring, or perforating, show formation name in descnb,ng work performed Number all drill stem tests sequentially Attach description of all cores Work performed by Producing Section will be roporfed on "lnllrim" sheets until final complehon Report official or representative test on "Final" form 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set Submit weekly for workovers and following setting of oH strm§ until completion ARCO Alaska, Inc. I NORTH SLOPE BOROUGH-PUO Field ~Lease or Umt PRUDHOE BAY FIELD I DS 3-13 Complete record for each day while dr~lhng or workover ~n progress POOL 102 Date and depth as of 800 am 05/06/88 TD:11925 PB:11834 SUPV:CD Well no DISP W! SEAWATER MW: 8.5 SEAWATER CONT POOH. LD 3-1/2" DP. SLIP DRL LINE. CHANGE OUT CENTRALIZER. RIH. W/ 5-1/2" COMPLETION. SPACE OUT. MU FMC 5-1/2" GEN III TBG HGR. DAILY:S33,711 CUM:$520,411 ETD:S520,411 EFC:$665,000 The above is correct For form preparation ar~/d~str~buhon see Procedures Manual~echon 10, Dr~lhng, Pages 86 and~7 IDate IT~tle ~-~0 ASSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History-Final Report Instructions Prepare and submit the "Final R~l)Oft" on the first Wednesday after allowable has been assigned or well ~s Plugged, Abandoned, or Sold "Final Report" should be submitted also whefl operations are suspended for an inde/imte or appreciable length of hme On workovere when an official test is not requ;red upon completion, repert coml:)letlon and representabve test data ~n blocks prowded The "Final Rll~rt" form may be used for reporting the entire operation if space is available I Accountlng cost center code D~stnct Stat~[K ARCO Alaska, Inc. I County or Parish NORTH SLOPE BOROUGH-PUO F~eld ~Lease or Umt PRODHOE BAY FIELD I ADL: 28328 Auth or W O no ~T~tle AS2203 I WORKOVI~R API: 50-029-20399 Operator IA R Co W I ARCO I 22 · 0000 Spudded or W O begun ~Date ACCEPT I 04/23/88 Complete record for each day reported POOL 102 05/07/88 (1~) TD:11925 PB:11834 SUPV:CD Date and depth as of 800 a m DS 3-13 IWell .o I otal number of wells (active or ,nact,ve) on th~s est center prior to plugg,ng and I bandonment of th~s well I our I Prior status if a W O I 1800 RIG RELEASED MW: 8.5 SEAWATER DISP WELL W/ SEAWATER AND DIESEL. LAND TBG. TEST TBG TO 3000 PSI. TEST ANNULUS TO 3000 PSI. SET BPV. ND STACK. NU FMC 5-1/2" TREE. TEST TREE. SHEAR OUT PLUG. SET BPV. SECURE WELL. RIG RELEASED AT 2400 HRS 5/6/88. SSSV @ 2214', FB-1 PKR @ 10839', TAIL @ 10955'. DAILY=S210,938 CUM=$731,349 ETD:S731,349 EFC:$665,000 Old TD New TO I PB Depth Released ng Date IKmd of rig Class~flcabons (oH, gas, etc ) I Type complehon (single, dual, etc ) Producing method I Official reservoir name(s) Potenhal test data Well no Date Reservoir Producing Interval Od or gas Test hme Produchon O~1 on test Gas per day Pump s~ze, SPM X length Choke size T P C P Water % GOR Gravity Allowable Effective date corrected The above is correct S~gnature I Date IT,tie For form preparation and/~/stnbution, see Procedures Manual, .~ctmn 10, Drtlhng, Pages 86 and 87 ASSOCIATE ENGINEER ARCI'I AI_A.~KA, TNC, ANCHPIK'AGE.. Al .AX'KA c795~ (3 DATF- RFFFRFN£F' AR~A ~FD HAlF FTN~I t I IT,;4-F' .ei[,r,l AN1') r, F,:FF F ! VFT'~ RY ...... !J,~VI- A f.,I r Arn-i NKIFTT , ,,f '--iF~' t [",i:-'Y A'" F, FF FTF'T F~F:' I')F'.,T,.',. .,. I~lm CJI & Gas Cans. C",,m,m...s,oa~ ' TF{ (~ N.e, ...... A I-' F' R' £~ ~,," {-- D I',%TR !' R! I T' T FIN ATI A? ,-~Ti A" ,'%T! ,4 "" AT' ,'~,-' ,-',fl,5" ,,TI ,," ,,~.- ~! ~ CFNTRAI FTI F~ ~ CHFvRnN D & M ~ EYTFNXTAN F~F'I ARATTAN ~ F~¥AN MARATHAN ~- M~TI F'H ri I TF'~ F'R WFI! ~ ...~TATF AF 5 TF'XAP.~] FTI DX' Al A,~I4 A © W W X © n~ X RECEIVED -s-t'a;te;uf. Alaska Y, X'of.,L CO SmZ A ZO CO SSZO · THRU: Lon. ie C Smith Conmissioner ~(~ . Michael T Hinder ~-~'~. Sr Fetrolemn Engineer DATE: May 2, 1988 FILE NO: D .HEH.32 TELEPHONE NO: SUBJECT.' BOP Test AAI PBU DS 3-13 Permit No. 79-71 Prudhoe Oil Pool FROM: Harold R Hawkins Petroleum Inspector Sunday, April 24~ 1988: I was at Prudhoe Bay, subject of other reports, and start'e'd'witnessin§ the BOP test on AAI PBU DS 3-13, All that could be tested at the time was tested. Monday, April 25, 1988.- Finished witnessing BOP test. There were no failures. ' ..... In summary, the BOP test on AAI PBU DS 3-13 performed by Arctic Pool 102 was satisfactory. Attachment: There was not a hydraulic operated choke on the manifold. The ARCO operator and Pool 102 tool pusher would like to have one for better safety. The API RP 53 blowout preventer manual is confusing. Z-001A (Rev 8185) , o&G' 5184 Inspector STATE OF ALASKA ALASKA 0IL & GAS CONSERVATION COMMISSION B.0.P.E. Inspection Report Well Location: Sec i/ T/0~/ / DrillinE Contractor /~;~7'/£ )~CP/- Ri: Location, General ~.~/~ Well Sign General Housekeeping d~ Rig 6/~ Reserve Pit ~')? J'/~/~k ~ Q ~'~ Mud Systems Visual Audio Trip Tank Pit- ~.auge Flow Monitor Gas Detectors BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Test ~esults: Test Pressure -- Failures Representative.~-~Z/6 ~Xm_~M Permit # 7,P--// f~'~/..Casing Set @ ~? ~ ~ ft. t;l~z-~ Representative ~,~ ~~/fTc? ACCUMLrLATOR SYSTEM Full Charge Pressure c~ C ~ psig Pressure After Closure /~ ~ ~ psig Pump incr. clos. pres. 200 psig ,--' mind'sec. Full Charge Pressure Attained: ~ min~ sec. Controls: Master Remote ~/~ Blinds switch cover ~ ,,. Kelly and Floor Safety Valves Uppe~..Kelly Lower Kelly Ball Type Inside BOP Choke Manifold No. Valves No. flanges Test Pressure ~- Test Pressure ~-'~ Test Pressure __~--~ Test Pressure Test Pressure Adjustable Chokes ~'~ ~/~ Hydrauically operated choke /~",,I~/)' ~rF/~/~ Test Time ~/' hrs. / ' ' Repair or Replacement of failed equipment to be made within---~,~ days and Inspector/ Commission office notified. Distribution orig. - A0&GCC cc - Operator cc - Supervisor ARC~ Al A~A, 1N£, ANCH~RAGF, AI_A~A 995 'l (') RFFERFNCF ARF;n £~XFD HDIF FINal ~- A-'i 7-RR NOT S'F/TFHPFRATIIRF RIIN 6-'l ~ ~-'i 9-RR F'RADIIC,'I' TAN I AF, RI IN .A-'t '1 "~-?G-RR PRFIIDIIC. TTFIN I I-IF, ~-t 4 ,'~-71 -SR PR'FII)IIFTTI~N I DF, 7-?9 ~-'1%-RA P. FT RIIN 'J'l-4 ~-?-RR CAI I ~R' ~ND F'FRFAR'~T F'F F,(; Y HFNNFTT AT Fi- 'l 5'"'9 TRANF ~8;470? APF'RrIVF'D ...................~ D 1 .~ Tr~' 1 RI I~ I rIK; .~P,H X'C.H .~C.H .~P.H ~ r'F't'J1 F,,'AI F1 I r Y '"- ["NFVA'FIN DAM ~ FXTFN~,'TFIN FYF'I ORA]'THW .,,--" HARATHDN ~ MI']RTl F'Nrl I 1~'? F'R WFI I F r l F? R A D ¢ S'TAIF rIF Al ARKA ~ TFYAPFI A ~ ~ OIL AND GAS CONSERVATION CO SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon_© Suspend [] Operation Shutdown ~ Re-enter suspended well [] Alter casmng .~. T~me extensmon ~ Change approved program ~- Pluggmg ~ Stimulate- Pull tubmg ~i~ Amend order ,___ Perforate "~ Other~,.. 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 847' FSL, 912' FWL, Sec.11, T10N, R15E, UN At top of productive interval 1769' FSL, 695' FEL, Sec.14, T10N, R15E, UN At effective depth 1367' FSL, 342' FEL, Sec.14, T10N, R15E, UM At total depth 1321' FSL, 300' FEL, Sec.14, TION, R15E, UM 5. Datum elevation(DF or KB) RKB 64' 6. UnitorProperty name Prudhoe Bay Unit 7. Well number 3-13 8. Permit number 79-71 9. APl number 50-- 029-20399 10. Pool Prudhoe Ba~, 0il Pool feet 11. Present well condition summary Total depth: measured true vertical 11925'MD feet Plugs(measured) 11311 ' 941 6' TVD feet (TOC current PBTD) Effective depth: measured 11 834 ' ND feet Junk (measured) true vertical 9350 ' TVD feet None Casing Conductor Surface Production Length S~ze Cemented Measured depth True Vertical depth 80' 20" 550 sx AS 80'MD 80'TVD 2696' 13-3/8" 6114 sx Permafrost 2729'MD 2714'TVD 11847' 9-5/8" 1500 sx Class G & 11877'MD 8683'TVD 300 sx Permafrost Perforation depth: measured true vertical RECEIV D 11064'-11084', 11090'-11145', 11160'-11190', aLit. r,,' 11194'-11234', 11264'-11314' ~rr~ ~., 8820'-8834', 8935'-8876', 8887'-8909', 8913'-8941 ', 8963'-9000' ~,,,, ,, Tubmng (s~ze, grade and measured depth) 5-1/2", 17#, L-80, tubing f/0-10862'; 4-1/2", 12.6#, N-80, PBackers nd SSSV (type and measured dej~th) aker ~ydro-set~ pkr @ 10850~, camco Bal-O SSSV ~ 2230~ tubing tail f/10862'-10925' 12.Attachments Description summary of proposal ~ Detailed operahons program F-; BOP sketch 13. Estimated date for commencing operation April 8, 1988 14. If proposal was verbally Name of approver Date approved 15. I hereby certify that the foregoing ~s true and correct to the best of my knowledge Signed ~-~~~L/~/~YJI . Title Associate Enqin~r -- Commission Use Only (JG) Date 5A3/79 Conditions of approval Approved by Notify commission so representative may w~tness I Approval No. [] Plug integrity ~ BOP Test ~ Location clearanceI ~ Mechanical Integri[y Td~proved Copy ORIGINAL SIGNED BY Returned LONNIE C. SMITH oZ/-,~'- Commissioner Form 10-403 Rev 12-1-85 by order of the commission Date ~,~4~ ./_// ':'/ Submit ~n triplicate PBU DS 3-13 PROCEDURE SUMMARY OBJECTIVE: Pull the tubing and packer, clean out fill, run new 9-5/8" packer, internally patch leaking FO in 9-5/8" casing, run 5-1/2" tubing. 1) RU slickline. Pull SSSV. Pull deepest gas lift valve. Set BPV. 2) MIRU Pool 102. Pull BPV. Circulate kill weight brine through deepest GLM. Set BPV. 3) ND tree. NU BOPE and test. 4) Pull 5-1/2" tubing and GLMs. 5) Retrieve PBR, mill and recover permanent packer. 6) RIH w/test packer and test casing to 2500 psi. 7) PU 8-1/2" bit and scraper, clean out fill to original PBTD. 8) RU and run a Vertilog casing inspection log. 9) RIH w/9-5/8" permanent packer assembly and set with DP. 10) RIH and set internal casing patch across leaking FO at 2474'. (NOTE- A noise log indicated the FO leaks to gas but does not leak to fluid). 11) Test casing patch with nitrogen to 2500'. 12) PU and run 5-1/2" tubing and space out. 13) Test tubing to 3000 psi. 14) ND BOPE. NU tree and test. 15) Release rig. Workover fluid: 8.7 ppg brine Anticipated bottomhole pressure: 3900 psi RECEIVEg LWK/34a 3/29/88 ANNULAR PREVENTER § PIPE RAHS 5 BLIND RAHS 4 l TUBIN6 HEAD 13-3/8" CASING HEAD 9-5/8" CASING HEAD 5000 PSI TUBING HEAD 13-5/8" - 5000 PSI BLIND RAilS lz-q/~" - 5000 PS', PIPE RAMS 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST I CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID 2 ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE iBOP STACK TEST 1 FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL 2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT tN WELLHEAD RUN IN LOCk -DOWN SCREWS IN HEAD. 3 CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD 4 TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES 5 INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTE5 BLEED TO ZERO PSI 6 OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS ~ INCREASE PRESSURE TO 5,.~.,0 :SI A~ID HOLD FOR I0 MINUTES 8 CLOSE VALVESD~EC~L, uP3T~EAi'I OFCHOKES BLEED DOWNST~E- PRESSURE TO ZEP,O PSi TO TEST VALVES TEST REMAINING L',~iTES-E: MANIFOLD VALVES iF ANY WITM 5000 PSI UPSTREAM OF VALVE WITH ZERO PSI DOWNSTM ~ ~ '-~, .LEED SYSTEM TO ZERO PSI. 9 C'PEN P~PE ~AM~ E, AC~ OF~ ~,JNN~NG JT AND PULL OUT OF HOLE ..... ,,,NU,~S 8LE CLO~E ~L',~D ~.A~IS A~D ~c:,, 5000 '~ cOP ~ ~0 ZERO 10 OPEN BLIND RAMS ANDPE'~C'.'EP TEST PLUG MAKESUPE MANIFOLD LINES ARE FiJL~ OF ARCT,C OtE'EEL AND ALL VALVES A~E SET IN D~'!LLI~G POSITION I 1 TEST STANDPIPE VALVES TO 5000 PSt 12 7EST KELLY COChS AND ~S~DE BOP TO 5000 PSI W~TH KOOMEY !3 ~ECORD TEST !NFOPMAT~ON ,)Fi E-uOwOUT PPEVENTE~ TEST FOR!" AND 5E~ID TO DRILLING SURER',':SOR 14 PERFORM COMPLETE DOPE ;E'~7 ONCE A WEEK AND FUNCTIONALL ~ OPERATE BORE DAILY dG NOVEMBER 21, 1 APPLICATION FOR SUNDRY APPROVALS 1 Type of Request: Abandon ~ Suspend ~ Operation Shutdown ,~ Re-enter suspended well ~ Alter casing ~ T~me extension _- Change approved program ~ Plugging ~ Stimulate- Pull tubIng ~..Amend order ~ Perforate r- Other~,. 2. Name of Operator ARCO Alaska, Inc. 3 Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Locahon of well at surface 847' FSL, 912' FWL, Sec.ll, TION, R15E, UN At top of productive ~nterval 1769' FSL, 695' FEL, Sec.14, TION, R15E, UM At effective depth 1367' FSL, 342' FEL, 5ec.14, TION, R15E, UM At total depth 1321' FSL, 300' FEL, Sec.14, TION, R15E, UM 5. Datum elevation (DF or KB) RKB 64 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-13 8. Permit numbe~ 79-71 9. APl number 50I 029- 2Q~,~)O 10. Pool Prudhoe Bay 0il Pool feet 11. Present well condihon summary Total depth: measured true vertical 11925' MD feet 941 6' TVD feet Plugs (measured) 11 311 ' (TOC current PBTD) Effective depth: measured 11 834 ' HD true vertical 9350 ' TVD Casing Length Size Conductor 80' 20" Surface 2696' 13-3/8" Production 11847' 9-5/8" feet Junk (measured) None feet Cemented Measured depth 550 sx AS 80'MD 6114 sx Permafrost 2729'MD 1500 sx Class G & 11877'MD 300 sx Permafrost Wue Verhcaldepth 80'TVD 2714'TVD 8683'TVD RECEIVE Perforahondepth: measured 11064'-11084', 11090'-11145', 11160'-11190', 11194'-11234' 11264'-11314' true vertical 8820'-8834,, 8935'-8876', 8887'-8909', 8913'-8941 ', 8963'-9000' Tubing (s~ze, grade and measured depth) 5-1/2", 17#, L-80, tubing f/0-10862'; 4-1/2", 12.6#, N-80, tubing tail Packers and SSSV (type and measured de~oth) Baker hydro-set pkr @ 10850', camco Be1-0 SSSV @ 2230' APR 0 [:-;,;; Naska 0il & Gas Cons. C~ Anchorage f/10862'-10925' 12.Attachments Description summary of proposal ~ Detailed operations program [] BOP sketch 13. Estimated date for commencing operation April 8, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~.,~,/H'A_, Title Associate E nqineer ~/ Commission Use Only ( J G ) SA3/79 Date Conditions of approval Notify commission so representative may witness I Approval No. g .- ~r~.~/,,.~-- [] Plug integrity [] BOP Test [] Location clearanceI ORIGINAL SIGNED BY LONNIE C. SMITH Approved by Form 10-403 Rev 12-1-85 Approved Copy Returned Commissioner tl~e commission Date mmissk Submit In triplicate PBU DS 3-13 PROCEDURE SUMMARY OBJECTIVE: Pull the tubing and packer, clean out fill, run new 9-5/8" packer, internally patch leaking FO in 9-5/8" casing, run 5-1/2" tubing. 1) RU slickline. Pull SSSV. Pull deepest gas lift valve. Set BPV. 2) MIRU Pool 102. Pull BPV. Circulate kill weight brine through deepest GLM. Set BPV. 3) ND tree. NU BOPE and test. 4) Pull 5-1/2" tubing and GLMs. 5) Retrieve PBR, mill and recover permanent packer. 6) RIH w/test packer and test casing to 2500 psi. 7) PU 8-1/2" bit and scraper, clean out fill to original PBTD. 8) RU and run a Vertilog casing inspection log. 9) RIH w/9-5/8" permanent packer assembly and set with DP. 10) RIH and set internal casing patch across leaking FO at 2474'. (NOTE: A noise log indicated the FO leaks to gas but does not leak to fluid). 11) Test casing patch with nitrogen to 2500'. 12) PU and run 5-1/2" tubing and space out. 13) Test tubing to 3000 psi. 14) ND BOPE. NU tree and test. 15) Release rig. Workover fluid: 8.7 ppg brine Anticipated bottomhole pressure: 3900 psi LWK/34a 3/29/88 ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS ITUBIN6 1 t3-3/8" CASING HEAD 2 g-5/8" CASING HEAD 3 5000 PSI TUBING HEAD 4 13-5/8" - 5000 PSI BLIND RAMS 5 l-¢-q/R" - 5000 PS', PlPE RAMS 6 t3-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST I CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID 2 ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF, 4. RECORD ON THE IADC REPORT THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING RECEIV ED APR 0 BOP 5TACK TEST/uaska Oil &~ .(~as Cons. Comrnl~ 1 FILL BOP STACK AND MAN~FOLD WITH ARCTIC DIESEL ~ncHorage 2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED, PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD RUN IN LOCK-DOWN SCREWS IN HEAD, 3 CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD, 4. TEST ALL COMPOI, IENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5, INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTE5 BLEED TO ZERO PSI 6 OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS 7 INCREASE PRESSURE TO 50,)0 PSI AHD HOLD FOR 10 MINUTES, 8 CLOSE VALVES DIRECTLY UPSTREAM OF CHOK. ES BLEED DOWNSTREAi': PRESSURE TO ZERO PSi TO TEST VALVES TEST REMAINING LI,qTESTED MANIFOLD VALVES. tF ANY W1TH5UO0 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTPEAI'! BLEED SYSTEM TO ZERO PSI, 9 OPEN PiPE RAMS E, ACK, OFF PUNNING JT AND PULL OUT OF HOLE CLOSE BLIND F, AI'IS AhD TEST ?) 50',)0 PSt FOR !0 M',NUTES BLEED TO ZERO PSi t0 OPEN BLIND RAMS AND RECOVER TEST PLUG MAKE SURE MANIFOLD AI':D LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES APE SET IN THE DRILLING POSITION 11 TEST STANDPIPE VALVES TO 5000 PSI 12 TEST KELLY CO~ .... Ai'~D IHS~DF BNP TO 5000 PSt WITH KOOMEY PUMP t3 RECORD TEST !NFO~I'IAT~ON ,)N ELOWOUT PREVENTER TEST FORM AND SEND TO DRILLING SUPERVISOR 14 PERFORP'I COMPLETE BORE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BORE DAILY dG NOVEMBER 21, 1986 , STATE OF ALASKA A_L( f' .)IL AND GAS CONSERVATION C(~f c~ION APPLICATION FOR SUNDRY A ',-'ROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing CI Amend order [] Perforate [] Other]i[~[ 2. Name of Operator ,~.CO ktaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 847' N & 912' E of SW ct. Sec 11, T10N, R15E, UM At top of productive interval 1769' N & 695' W of SE cr. Sec 14, T10N, R15E, UM At effective depth 5. Datum elevation (DF or KB) 64' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-13 8. Permit number 79-71 9. APl number 5O--029-20399 At total depth 10. Pool 1321' N & 300' W of SE cr. Sec 14, TiON, R15E, UM Sadlerochit 11. Present well condition summary Total depth. feet measured true vertical Effechve depth: measured true vertical Casing Length Size Structural 11,925 feet 9,416 feet 11,311 feet 8,934 feet Plugs (measured) None Junk (measured) None Cemented Measured d'~[t~~ 0~,X ~ ~e~e~0~ ~m~t~t°a · ~rue vertical depth Conductor 80' 20" 550 sx Arctic Set Cmt 80' 80' Surface 2729' 13 3/8" 6400 sx Perm Cmt 2729' 2714' Intermediate Production 11877' 9 5/8" 1500 sx Class "G" Cmt 11877' 8683' L~ner Perforahon depth, measuredl1064'-11084' MD (8820 '-8834 'TVD) .: 11090'-11t45' ND (8935'-8876'T~); 11160' 11190' lyE) (8887'-8909'TVD); 11194'-11224' MD (8913'-8934'T~); trueverhc~i[224' 11234' MD (8934'-8941'TVD); 11264'-11314' MD (8963'-9000'T ) Tub,ng (size, grade and measured depth)5½", 17#, L-80, 0-10862' ~ (Plastic Coated) 4½", 12.6#, N-80, 10862'-10925' lvfl) (Plastic Coated) Packers and SSSV (type and measured depth)Baker Hydroset Packer @ 10850' Camco Bal-O SSSV Nipple @ 2230' 12.Attachments Description summary of proposal~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation N/A 14. If proposal was verbally approved Name of approver Mike Mendor Date approved 9/9/87 15. I hereby~certify th. at th.~ foregoing is true and correct to the best of my knowledge Signed,~,,-~~.~/,~~.~/~,,.~_ _ Title O[~erations En~ineerin~ Manager Commission Use Only Conditions of approval Approved by Date ,~_~ Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance~ '?J ~ '~/ Commissioner by order of the commission Date Form 10-403 Rev 124-85 Submit in triplic~/ ARCO Alaska, Ir~ PrudhoeB.,y Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 18, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS #3-13i Permit No. 79-71 Dear Mr. Chatterton: Attached is the Application for Sundry Approval as required per Rule 7 of Area Injection Order No. 4 for the above referenced well. Very truly yours, D. [. Scheve D[S4/12:cb Attachment cc: Standard Alaska Production Company k. k. Gantt, AIO 1520 J. W. Groth, ATO 1576 H. G. Limb/G. D. Herring, PRB 24 P1(DS#3-13i)W1-3 ARCO Alaska, Inc ,s a Subsidiary of AtlanhcR~chfleldCompany INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: 9/9/8 7 TIME: 2:00 P. M. NOTIFIED BY: REASON: Eric Skaalure AOGCC CONTACT: Mike Mendor Injection Well 3-13 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 DISCUSSION: While on MI, 9-5/8" pressure builds up slowly indicating a small tubing leak. Also, 9-5/8" x 13-3/8" communication was clearly indicated during pressure monitoring. The locations of both the tubing leak and the 9-5/8" leak are unknown at this time. The well has been converted to water injection and the tubing leak has subsided. This well passed a State-witnessed mechanical integrity test in July of this year. We plan to leave the well on water injection and perform further diagnostic work to better define the 9-5/8" leak problem. AOGCC RESPONSE: OK to continue water injection until a formal ruling can be obtained from the Commission. Need to file a Sundry Notice describing the problem and outlining plans/timing of diagnostic work. Sundry Notice Req'd at this time? YES X NO~ PRODUCTION SUPPORT SUPERINTENDENT DS Supervisor - FS #2 FS Superintendent - FS #2 Production Support Superintendent (H. T. Hong/E. W. Skaalure) Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) Field Area Operations Engineer (J. D. Ottoson/T. G. Zibell) SEP 2 ~- 1S~1 Gas CoUS. ~,omm~ssl~ Annular Communication Sr. Field Engineer (G. D. Herring/H. G. Limb) (9/14/87) , ARCO Alaska, Inc. F'.O. Box t00:360 Anchorage° Alaska DATE' February REFERENCE' ARCO Cased Hole Finat -"3-6 2-t-8T Inj. Profile Run ~, 5' ;5-*7 2-2-8*7 Inj. Profi le' Run t, 5' ~-'8 2-2-87 Prod, Profi le Run ~3-~2 ~-3t-87 Inj. F'rofi [e Run ~-~ ~ 2-~ ~ -87 Inj. F'rof i [e Run 3-26 2-2-87 F'rod. Profi[e Run ~9-5 ~/28-3~/87 Prod. Pi ofi [e Run ~-5 2-4-87 lemp. Log Leak DeSect'iona Run ~ 9-..7 2-4-87 GR/F [owmeter Run ~9-~ ~ ~-26-87 Sp inner/GR R~;n ~9-~3 2-5-87 GR/F [owme~er Run 9-26 2-6-87 GR/F[owme'ter Run ~, 5" ~9-.27 2/6-7/87 Prod. Profi [e Run ~, 5' ~~8-~2 2-~5-87 GR/Tubing Collar Log Run ~, 5" & 5" Ca mc o Camco Camco Camco Camco Camco Ca mc o Camco Camco Camco Camco Camco Camco Camoc Please .sign and re~urn the at~ached copy as receip+, of data. Received By_._ I.IAVE A NICE DAY! Ro~anne F'eek A'I[ 0 .- t "~"~_.., TRANS ~87i Approved ( FEB 2 3 .l.987 Alaska Oil & Gas Cons. Commission Anchorage DI$IR [BIJ I'ION ARCO ALaska, loc. F'_O. Box Anchorage, A I a.~i<a 995 i 0 hA1,., E. November REFERENCE ARCO Ca.'~t:,,I Hole, F :.hal ~' -.Ifil ,: L, I ' ci fi I (. HAVF A NICr L',AY' (;er, tra I Cl~e vr E×i'e~lo'n Expl,_,~ u~, Ex Marathon f,: Mc, b~ I I' ~'''~'-"'''~~~'~Cll'q /~ Alaska 0,t & Gas Cons, Commission !", t 'TIV 1 Anchorage I'-I iv;_ ~ II f-'ll~ I tip:, ARCO Alaska, Inc· F'.O. Box t00360 Anchorage, ALaska 995 t ~) DATE: March tt, 1986 REFERENCE' ARCO Cased Hole Fina L ~DS t-6 t2-t4-85 F'DK t00 Run t 5" ~DS ~-t0 t t-25-84 TDT Run 3 5 · ~D$ 3-t 2-t3-86 Gal,~ma Ray 5' K'DS 3-t t t2-25-85 CFS Run t 5' ~D~ 3-t3 t2-26-85 CF~ Run t 5' ~DS 3-~5 ~-9-86 Spinner/GR/F[uid ID Run ~ 5" ~DS 3-24 ~-~-85 CNL/Mu[~i-Space Run ~ 5" DS ~-24 t~-~-8~ EpiLog Lac Analysis Run t 5" ~DS ~-25 ~-8-86 Spinner/GR Run t 5' ~S 3-28 t ~-3~-8D TDT Run t 5" DA Sch Otis Go Go Ca~co DA DA Ca~co $ch F'[ease sign and re$.urn the attached Copy as receipt of data. Received By_. HAVE A NICE DAY! Irn~a Car[in ATO-t429F TRAN$ ~86t95 DISTRIBUTION Central Files Chevron Extension Exploration Ex xon Marathon Hob i L Phillips PB Well Fi les R &D $ohio State of' Alaska Texaco ARCO Alaska, Inc. Post Off,ce Box ,00360 Anchorage Alaska 99510 Telephone 907 276 1215 Date: February 18, 1985 Reference: ARCO Pressure Reports .~3-13 Pressure Data 12-14-84 GO 9-12 Pressure Data 12-17-84 GO j9-14 Pressure Data 12-19-84 GO 16-3 Pressure Data 12-12-84 GO Please sign and return the attached copy as receipt of data. Received by Pam Lambert ATO 1429C Trans~ ~)~_~ Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska Inc ~. a Subsidiary of AllantlcR~chf~eldComDanv ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer February 5, 1985 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-4 Permit No. 76-51 DS 3-8 Permit No. 76-73 DS 3-11 Permit No. 03-11 DS 3-12 Permit No. 76-58 DS 3-13 Permit No. 79-71 DS 3-16 Permit No. 79-93 DS 3-17 Permit No. 79-102 DS 11-7 Permit No. 71-177 Dear Mr. Chatterton: Attached are Completion Reports above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/mjb Attachments CC: Sohio Alaska Petroleum Co. File Pi(DS 3-4)W1-3 File PI(DS 3-8)Wl-3 File PI(DS 3-11)Wl-3 File Pi(DS 3-12)Wl-3 File Pi(DS 3-13)Wl-3 File Pi(DS 3-16)Wl-3 File Pi(DS 3-17)Wl-3 File Pi(DS 11-7)Wl-3 for work completed on the RECEIVED AlasRa 011 & Gas Cons. C0mmJsslot~ Anchorage ARCO Alaska, Inc II I Sublldlary o! AlllnllcRIchfleldComplny L( STATE OF ALASKA C~, ALASKA _ AND GAS CONSERVATION C /llSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,, 1. Status of Well Classification of Serv,ce Well Water Injector OIL [] GAS [] SUSPENDED r~ ABANDONED [] SERVICE [~ , 2. Name of Operator 7 Permit Number ARCO Alaska, Inc. 79-71 , - 3. Address 8 APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-20399 , 4 Locat,on of well at surface 9 Umt or Lease Name 847'N & 912'E of SW cr Sec 11, TION R15E, UM Prudhoe Bay Unit , - At Top Producing Interval 10 Well Number 1769'N & 695'W of SE cr Sec.14, T10N, R15E, UM 3-13 At Total Depth 11 F,eld and Pool 1321'N & 300'W of SE cr Sec. 15, T10N, R15E, UM Prudhoe Bay Field , 5 Elevat,on ,n feet (,nd,cate KB. DF. etc.) I 6 Lease Des,gnat,on and Serial No Prudhoe Bay 0il Pool 64' RKBJ ADL 28328 , 'i2 'Date Spudded 13. Date T.D. Reached 14 Date Comp. Susp or Aband.' 15. Water Depth. if offshore , 16 No of Completions 11/05/79 11/25/79 12/04/79(perf' d 2/26/80J I'- feet MSL 17. Total Depth (MD+TVD) 18 Plug Back Depth(MD+TVD) 19 D,rect,onal Survey 20. Depth where SSSV set 21 Th,ckness of Permafrost l1925'MD,9416'TVD 11834'MD, 9350'TVD YES [~ NO [] 2229' feet MD 1900' (Approx) 22 Type Elect"c or Other Logs Run DIL/SP, BHCS/CAL/GR, FDC/CNL/CAL/GR, CNL/CCL/GR 23. CASING, LINER AND CEMENTING RECORD sETTING DEPTH MO CASING SIZEWT. PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 9~Weld'" H-40 Surf 80' 30" 550 sx Arctic set cmt. 13~3/8'' 72# Butt L-80 Surf 2729' 17-1/2" 6400 sx Perm. Cmt. 9-5/8" '"47# Butt S-95 surf 11877' 12-1/4" 1500 sx Class "G" Cmt. , , 24 Perforat,ons open to Product,on (MD+TvD of Top and Bottom and 25 TUBING RECORD ,nterval, s,ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) *11,064' - ll,084'MD 5-1/2" 10,850' 10,985' 11,090 ' - 11,145 'MD 11,160' - 11,190'MD 26 ACID. FRACTURE. CEMENT sQuEEZE. ETC 11,194' - 11,234'MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11,264' - ll,314'MD N/A *added on 5-27-84 w/ 6/SPF TVD of Perfs: 8816 - 9000' ,,, 27 PRODUCTION TEST , Date First Production I Method of Operat,on (Flow,ng, gas hft, etc.) N/AJ Flowing - Converted to injection on Sept. 23, 1984. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I~ t Flow Tub,ng cas',ng Pressu;'e CALCULATED OIL-BBL GAs-MCF WATER-BBL OIL GRAVITY-APt (corr) Press. 24-HOUR RATE e 28. CDR E DATA Dr,el descmpt~on of I~thology, por°slt¥, fractures, apparent d~ps and presence of mi, gas or water Subm,t core ch~ps. RECEIVED F E B ! 1 1985 Alaska Oil & Gas Cons. Commission ~ r~ch~'a,le ...... Form 10407 Subm,t in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ' GEOLOGIC MARKERS ' ' FORMATION TE~STS NAME Include ,nterval tested, pressure data. all flu,ds recovered and grawty. MEAS DEPTH TRUE VERT DEPTH GOR.and time of each phase Top Sadlerochft 11060' 8813' Base Sadlerochtt 11792' 9350 O/W Contact 11418' 9075 ' 31 LIST OF ATTACHMENTS 32 I hereby certify that the foregoing ~s true and correct to the best of my knowledge Signed ~/~//~~.~~.~,.. . - Title Regional Oper. En;R. Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells. Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for ~njection, observation, injection for in-situ combustion. Item 5' Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If thru well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for th~s well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer December 27, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-4 Permit No. 76-51 DS 3-11 Permit No. 79-47 DS 3-12 Permit No. 79-58 DS 3-13 Permit No. 79-71 DS 3-17 Permit No. 79-102 DS 12-21 Permit No. 84-48 DS 12-22 Permit No, 84-60 DS 12-25 Permit No. 83-166 Dear Mr. Chatterton: Attached are Sundry Notices for above-mentioned wells. ..truly yours, , DFS/JEB/mjb Attachments cc: Sohio Alaska Petroleum Company File PI(DS 3-4)Wl-3 File Pi(DS 3-11)Wl-3 File Pi(DS 3-12)Wl-3 File Pi(DS 3-13)W1-3 File Pi(DS 3-17)Wl-3 File Pi(DS 12-21)W1-3 File Pi(DS 12-22)Wl-3 File Pl (DS 12-25)Wl-3 work completed on the RECEIVED DEC Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc Is a Subsidiary of AtlanllcRIchfleldCompany STATE OF ALASKA C~ ALASKA OIL AND GAS CONSERVATION C ~v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL ~3X OTHER [] Name of Operator ARCO Alaska, Inc. 3 Address P.O. Box 100360, Anchorage, Alaska 99510 12 7 Permit No 79-71 Location of Well (Surface) 847' N & 912' E of SW cr, Sec 11, T10N, R15E, UM (Producing Interval) 1769' N & 695' W of SE cr, Sec 14, T10N, R15E, UM (Total Depth) 1321' N & 300' W of WE cr, S~% 14: T10N; R15E: UM Elevation In feet (mdlcate KB, DF, etc ) / Lease Designation and Serial No 64 RKB ADT. 2R~2R Check Appropriate Box To Indicate Nature of Notme, Report, or Other Data 8 APl Number 50- 029-20399 9 Unit or Lease Name Pr~h~ RAy [~n~ 10 Well Number D.q q-lR 11 Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool NOTICE OF INTENTION TO (Submit ~n Trlphcate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulhng Tubing (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) SUBSEQUENT REPORT OF (Submit m Duplmate) [] Altenng Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) ARCO Alaska, Inc. has converted DS 3-13 to produced water injector service. This well is part of the Flow Station 2 injection project and was intended for this service as indicated in the "Application for Approval as a Qualified Tertiary Recovery Project for Purposes of the Crude Oil Windfall Profit Tax Act of 1980," (August, 1982). The well began receiving water on September 23, 1984. RECEIVED Alaska Od & (~as Cons. Cornrnissiotl Anchorage Approved by By Order of COMMISSIONER the Comm,ss~on Date Form 10-403 Rev 7-1-80 Submit "Intentions" ~n Tnphcate and "Subsequent Reports" ~n Duplicate ( ALASKA OIL AND GAS CONSERVATION COMMISSION / 3OOl PORCUPINE DRIVE / ANCHORAGE, ALASKA 99501-3192 December 27, 1984 / TELEPHONE(907)279-1433 ADMINISTRATIVE APPROVAL NO. 192.9. Re .. Substitution of pressure fall-off surveys in five injection wells for transient pressure surveys in producing wells as required by Rule 6(d) of Conservation Order No. 165. Mr. D. F. Scheve Regional Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Dear Mr. Scheve: · On December 6, 1984 ARCO Alaska, Inc. requested pressure fall-off surveys in Prudhoe_Bay Unit water injection wells DS 3-13, DS 9-12, DS 9-14, DS 16-3, and DS 17-8 be accepted to satisfy requirements of Conservation Order No. 165, Rule 6(d). At a meeting with ARCO representatives, December 26, 1984, data were submitted which demonstrate that appropriate reservoir pressure data for reservoir management can be obtained from a four hour minimum pressure fall-off survey in injection wells. The Alaska Oil and Gas Conservation Commission hereby approves the substitution of four hour minimum pressure fall-off surveys in Prudhoe Bay Unit water injection wells DS 3-13, DS 9-12, DS 9-14, DS 16-3, and DS 17-8 to satisfy requirements of Conservation Order No. 165, Rule 6(d). This action is taken pursuant to Rule 2 of Conservation Order No. 192. Yours very truly, Kugldr Commissioner BY ORDER OF THE COMMISSION HWK/RAD:be: 1.AA 192 ARCO Alaska. Inc. F'.O. Box t00560 Anchorage: Alaska DATE December ~'t, t°84 REFERENCE' ARCO Cased HoLe FinaLs D.S- 5-4J ii-7-8'-*, D.". 3-i9/ ii-i-84 ,., ' · _"Z _.04 D. "z-it-~' t'~ ..., '-' D '" S-4, 2 i ~ -2-84 _. ~, ...q ,¢. D.~. 3-t2 t t-t °4 -... D " 4-Ii t i-'i 8-84 ][, "' 9-*,¢'" i ~-i "~-84 I) c - '., -~ t i - 4, c,_ 8 4 D,F ~ 4- 'ti-t°-°'4 D *' c;,_,.-;./ t °-8-84 D. *" c, ,t, '~ t '~- t -',_.on [., . ," o. -'~ 'I '"- i · -'-.'~' I) e o_ ~ o D" t3 3~ t°''''-844 D,,E:~ t 4-'25' ~ 2-6-84 D.'" t'*'-~''' ' CFY/Y.P I'n;-,er Ru¥, i C F Y/2-': P Inner Rut, D iff Temp Log Run Run Diff Temp Run 'l Cfi-/-p CFv ~p;nner Run t CN,'hY/GR R u n ~pinner Log CN/H~/GR Pun Ci~/M;S/GR i;:un ~pl~e*' Log F:u~'~ i CN/M~/GF: R u,~ $:p Inner Log :~F Inner Lo9 Run ~ nj t:'rof I [e/<'P ' ,,,,e, Ru¥, i Dp inr, er.'le,,,P ~nj F'r(,f ~ LP t::un N:. - ]nj Profl Le,'/:r inner ~,~m;: R'$r~ $,'~lil .L~j ['rOll [e L'p~,~nrr, 'l-~ mp Ru.r, Dirt ]emF' k_o9 " I':oL I':' rlcFa;' Land ,,,::/.a u,, , .'-~" .... A-i O- ~, 429,r at.& . Chevron !., & fi ExP lorat IOF, 0?ervlces Ex xnn Mc, L-,' L flr,l,I i [ ' I F'l,t L[ : i-,'. :'ohio :7~ ,!r, (3; Ai;,.-I ~., ARCO Alaska, Inc( Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer July 20, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-4 DS 3-11 DS 3-12 DS 3-13 DS 3-16 DS 3-17 Permit No. 76-51 Permit No. 79-47 Permit No. 79-58 Permit No. 79-71 Permit No. 79-93 Permit No. 79-102 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Ve~ truly~yours, D. F. Scheve DFS:WT:kg Attachments CC: SOHIO Alaska Petroleum Co. File Pi(DS 3-4)Wl-3 File Pi(DS 3-11)Wl-3 File Pi(DS 3-12)Wl-3 File Pi(DS 3-13)Wl-3 File P1 (DS 3-16)Wl-3 File PI(DS 3-17)W1-3 ECEI VED JUL 2 6 Alaska 0il & Gas Cons. AnChorage Comrnisslo/~ ARCO Alaska, Inc Is a Subsidiary of AllantlcRIchfleldCompany STATE OF ALASKA ( ALASKA .- AND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WE LL;I~ OTHER 2 Name of Operator 7 Permit No ARCO Alaska, Inc. 79-71 3 Address P.O. Box 100360, Anchorage, Alaska 99510 4 Locat,on of Well (surface) 847' N & 912' E of SW cr Sec 11, T10N, R15E, UM (Producing Interval) 1769' N & 695' W of SE cr Sec 14, T10N, R15E, UM (Total Depth) 1321' N & 300' W of SE cr Sec 14, T10N, R15E, UM 5 Elevation ~n feet (,nd~cate KB, DF, etc ) I 6 Lease Designation and Serml No 64' RKB I ADL 28328 12 8 APl Number 50-- 029-20399 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number DS 3-13 11 F,eld and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF (Submit ~n Tr~phcate) (Submit m Duplicate) Perforate [] Alter Casmg [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubmg [] Other [] Pulhng Tubing [] (Note Report mult,ple completions on Form 10-407 w~th a submitted Form 10-407 for each coml~let~on ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~nclud~ng esttmated date of starting any propo~d work, for Abandonment see 20 AAC 25 105-170) Began perforating operation 5/27/84. RU perforating unit, pressure tested equipment. RIH with gun #1, shot interval 11064 - 11084' MD (6spf), flowed well to clean up. Shut in well, POOH, all shots fired. Ran SSSV, secured well, RD. Ref: BHCS 11/26/79 14 , hereb~/~_ ,f: t~t the foregomg ,s true and correct to the best of my knowledge ~ ~/~,~ /x~ ~'~ Regional Engineer The space below for Comm,ss,on use f Conditions of Approval, ~f any By Order of Approved by COMMISSIONER the Comm~ss,on Date __ Form 10-403 Rev 7-1-80 Submit "Intentions" in Trlphcate and "Subsequent Reports" ~n Duplicate ( ARCO Alaska, Inc. Post Ofhce Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 June 14, 1984 Reference: ARCO Cased Hole Finals f D.S. 1-21 5-4-84 Epilog Run 2 jD.S. 1-25 5-26-84 Spinner Log Run ! ~D.S. 2-17 3-28-84 Spinner Log/Basket Flowmeter Run 2 ~D.s. 3-13 5-21-84 CFS/Spinner Run 1 ,~D.S. 3-27 5-18-84 ACBL/VDL/Signature/GR Run 1 ,~D.So 4-1 5-6-84 Epilog Run 2 ~D.S. 4-4 5-14-84 CH CNL Run 1 ~D.S. 5-8 ~-5-84 Epilog Run 1 ~D.S. 6-4 5-30-84 CP1/TDT-M w/listing 5" Sch ~-DcS. 7-20 4-18-84 Spinner Run 1 ~,D.S. 12-16 5-20-84 PLS Run 1 ~D.S. 9-4 5-7-84 Epilog Run 1 ~D.S. 7-25 4-22-84 Spinner Run 1 /D.S. 7-22 4-20-84 Spinner Run 1 ~-D.S. 12-18 6-1-84 CPL/TDT-M w/listing 5" Sch .~D.S. 12-23 5-19-84 ACBL/VDL/Signature/GR Run 1 ~,~D.$. 14-2 5-3-84 Epilog Run 3 ~,D.S. 14-25 5-18-84 CFS/Spinner Run 1 ~D.S. 14-32 5-20-84 CFS/Spinner Run 1 ~D.S. 14-34 6-5-84 CPL/TDT-M w/listing 5" Sch ~,D.S. 17-1 5-24-84 Collar/Peri Log Run 1 ' P~~lease sign and return the attached copy as receipt of data. Don't Forget Dad on his day! 5" DA 5" Camco 5" Camco 5" GO 5" DA 5" DA 5" GO 5" DA 5" Camco 5" DA 5" DA 5" Camco 5" Camco 5" DA 5" DA 5" GO 5" GO 5" GO Kelly McFar land ATO-1429F Trans. # 242 D ISTRIBUT ION Chevron D&M Drilling Exp. Services Ext. Exploration Exxon Getty Marathon Mobil Mobil E & P Phillips Prudhoe Bay Well Files R & D Carolyn Smith Sohio State of Alaska i ARCO Alaska, I~~ Prudhoe 15,., ~'ngineersng Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regsonal Operations Engineer May 23, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 3-4 DS 3-10 DS 3-11 DS 3-12 DS 3-13 DS 3-16 DS 3-17 DS 3-18 Permit No. 76-51 Permit No. 79-21 Permit No. 79-47 Permit No. 79-58 Permit No. 79-71 Permit No. 79-93 Permit No. 79-102 Permit NO. 79-103 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments CC: Sohio Petroleum File Pi(DS 3-4,10,11,12, 13,16,17,18)Wl-3 RECEIVED MAY 2 41984 Alaska 0il & Gas Cons. Commisslon .~nchorage ARCO Alaska, Inc Is a Subsidiary of AtlantlcRIchfleldCompany ALASI~ '~' STATE OF ALASKA ~ _ AND GAS CONSERVATION (' VlISSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL 2. Name of Operator 7 Permit No ARCO Alaska, Inc. 79-71 3 Address 8 APINumber P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20399 4 Location of Well 847'N S 912'E of SW cr Sec. 11, T10N, R15E, OM 1769'N & 695'W of SE cr Sec. 14, T10N, R15E, UM 1321'N & 300'W of SE cr Sec. 14, T10N, R15E, UM 5 Elevation ~n feet (~nd~cate KB, DF, etc ) I 6 Lease Designation and Serml No 64' RKB I ADL 28328 12 Check AppropnateBoxTolnd~cate NatureofNotme, Report, orOtherData 9 Unit or Lease Name Prudhoe Bay Unit 10 Well Number DS 3-13 OTHER [] 11 F~eld and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF (Submit ~n Tnphcate) (Submit m Duplicate) Perforate E~ Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) ARCO Alaska, Inc. proposes to add perforations on DS 3-13 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit with the intent to convert it to a sea water injection well. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: Ref: BHCS 11/25/79 RECEIVED MAY 2 4 1984 S~o~m Alaska 0ii & Gas Cons. Commission ~o. Anchorage 11064-11084' MD Date S,gned ~ _ _ _ T,tle Regional Engineer The space below for Corem,Ms,on use Conditions of Approval, ~f any Approved Copy ~j~etu r, ned By Order of Approved by I]Y [[~1[ C. S~I]'B COMMISSIONER theComm,ss,on Form 10-403 Rev 7-1-80 Submit "Intentions" ~n Trlpl,cate and "Subsequent Reports" ~n Duplicate . ALASi~'~ STATE OF ALASKA _~L AND GAS CONSERVATION ,MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Class~hcatlon of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2 Name of Operator 7 Permit Number ARCO Alaska, Inc. 79-71 3 Address 8 APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20399 4 Locat.on of well at surface 9 Unit or Lease Name 847'N & 912' E of SW cr. Sec. 11, T10N, R15E, UM Prudhoe Bay Unit At TopProducmg Interval 10 Well Number 1769' N & 695' W of SE cr. Sec. 14, TION, R15E, UM DS 3-13 At Total Depth 11 F~eldandPool 1321' N & 300' W of SE cr. Sec. 14~ T10N~ R15E~ UM Prudhoe Bay Field 5 Elevation m feet (md.cate KB, DF, etc ) I 6 Lease Demgnat~on and Serml No Prudhoe Bay Oil Pool 64' RKB] ADL 28328 12 Date Spudded 13 Date T D Reached 14 Date Comp , Susp or Aband I 15 Water Depth, .f offshore 116 No of Completions 11/5/79 11/25/79 12/4/79(perf'd 2/26/80)I __ feet MStI 1 17 TotalDepth (MD+TVO) 18 Plug Back Depth (MD+TVD} 19 DlrectlonalSurvey I 20 Depth where SSSV set I 21 Thlckness of Permafrost 11925'MD, 9416'TVD 11834'MD, 9350' TVD YES~] NO []I 2229 feet MDI Approx. 1900' 22 Type Electmc or Other Logs Run DIL/SP, BHCS/CAL/GR, FDC/CNL/CAL/GR, CNL/CCL/OR 23 CASING, LINER AND CEMENTING RECORD SE/TING DEPIH MD CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20;; 9~rwe,d ~-40 Surf. ~0' ]0" 550 sx Arcticset CmL. 13-3/8" 72#butt L-80 Surf. 2729' 17½" 6400 sx. Perm. Cmt. 9-5/8" 47#butt S-95 Surf. 11877' 12k" 1500 sx. Class "G" Cmt. 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD ~nterval, s~ze and number) SIZE DEPTH SET (MD) PACKER SET (MD) *11090-11145' MD (55') 8935-8876' TVD 5½" 10850' 10985' *11160-11190' MD (30') 8887-8909' TVD *11224-11234' MD (10') 8934-8941' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC *11294-11314' MD (20') 8985-9000' TVD DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 11264-11294' MD (30') 8963-8985' TVD N/A 11194-11224' MD (30') 8913-8934' TVD *New perfs shot w/4spf 27 PRODUCTION TEST Date F~rst Produc't~on Method of Operanon (FIowmng, gas I~ft, etc ) N/A Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 3/8/84 6.1 TEST PERIOD I1~ 879 1824 0 37/64 2076 I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press 1363 1275 24-HOUR RATE I1~ 3457 7176 0 27.2° 28 CORE DATA Brief description of I~thology, porosity, fractures, apparent d~ps and presence of o~1, gas or water Submit core ch~ps r~¢ RECE ED Ahska 0il & G~s c-tls, C0m~lssi0n Form 10-407 Subrn~t in duphcate Rev 7-1-80 CONTINUED ON REVERSE SIDE 29 ' 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include ~nterval tested, pressure data, all fluIds recovered and grav,ty, MEAS DEPTH TRUEVERT DEPTH GOR, and t,me of each phase Top Sadleroch£t 11060' 8813' O/W Contact 11418' 9075' Base Sadlerochit 11792' 9350' 31 LIST OF ATTACHMENTS 3'2 I hereby certify that the foregoing m true and correct to the best of my knowledge S,gned ~~~~~ T,tle Re,iona, En,ineer Date ~/~'//1~' ~ --__ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1 Classification of Service Wells' Gas injection, water injection, steam injection, a~r injection, salt water dmposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwme shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If th~s well ~s completed for separate production from more than one interval (multiple completion), so state ~n item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23 Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27 Method of Operation Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28 If no cores taken, ~nd~cate "none". Form 10-407 ARCO Alaska, Inc.( Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 2, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-13 Permit No. 79-71 Enclosed is the "Subsequent" Sundry Notice detailing work done on the above-mentioned well. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: SOHIO Alaska Petroleum Co. File 100.0 ARCO Alaska, Inc Is a Subsidiary of AtlantlcRIchfleldCompany ALASKir/~, STATE OF ALASKA , t:,,_ AND GAS CONSERVATION 0(' alSSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL 1~ OTHER [] 2 Name of Operator 7 Permit No ARCO Alaska, Inc. 79-71 3 Address 8 APINumber P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20399 4 Location of Well 847' N & 912' E of SW ct. Sec. 1769' N & 695' W of SE cr. Sec. 11, T10N, R15E, UM 14, T10N, R15E, UM 1321' N & 300' W of SE cr. Sec. 14, T10N, R15E, UM 5 Elevat,on m feet (red,cate KB, DF, etc ) I 6 Lease Deslgnat,on and Serial No 64' RKB I ADL 28328 9 Umt or Lease Name Prudhoe Bay Unit 12 10 Well Number DS 3-13 11 F,eld and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF (Submit m Tr~phcate) (Submit m Duplicate) Perforate [] Alter Casing [] Perforations 2~] Altering Casing [] Stlm ulate [] Abandon [] Stem ulat~on [] Aba ndonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~nclud~ng esumated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170) Began perforating (additional) operation 2/26/84. RU perforating unit, pressure tested surface equipment. RIH w/gun #1, flow well to tank; shot 11294-11314' MD, 4 spf, 20'. POH, all shots fired. PT, RIH w/gun 92, shot 11224-11234' MD, 4 spf, 10' and 1118-11190' MD, 4 spf, 10'. POH, all shots fired. PT, RIH w/gun #3, shot 11160-11180' MD, 4 spf, 20'. 2/27/84, POH, all shots fired. PT, RIH w/gun #4, shot 11125-11145' MD, 4 spf, 20'. POH, all shots fired. PT, RIH w/gun #5, misfire, POH. PT, RIH w/gun #5, shot 11110-11125' MD, 4 spf, 15'. POH, all shots fired. PT, RIH w/gun #6, misfire, POH. PT, RIH w/gun #6, shot 11090-11110' MD, 4 spf, 20'. POH, all shots fired. Note: Reference log CNL 11/29/79, Main Pass Neutron 14 I hereby c_ert~fy that the foregoing ~s true and correct to the best of my knowledge The space below for Commission use Conditions of Approval, ~f any By Order of Approved by. COMMISSIONER the Comm~ss,on Date Form 10-403 Rev 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" ~n Duplicate / ARCO Alaska, Inc. {r Prudhoe Bay'~,_,~g~neering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer January 30, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-13 Permit No. 79-71 Enclosed is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. Fo Scheve DFS/JCD/la Attachments cc: SOHIO Alaska Petroleum Co. File 100.0 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc Is a Subsidiary of AtlantlcRIchfleldCompany '" STATE OF ALASKA / ALASK/~ .~ AND GAS CONSERVATION C( ,vllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WE LL :7~ OTHER [] 2 Name of Operator 7 Perm~tNo ARCO ALASKA, Inc. 79-71 3 Address 8 APl Number P.O. BOX 100360, Anchorage, AK 99510 50- 029-20399 4 Location of Well 847' N & 912' E of SW cr. Sec. 11, T10N, R15E, UM 1769' N & 695' W of SE cr. Sec. 14, T10N, R15E, UM 1321' N & 300' W of SE cr. Sec. 14, T10N, R15E, UM 5 Elevation in feet (md~cate KB, DF, etc ) I 6 Lease Designation and Serml No 64' RKB I ADL 28328 12 9 Umt or Lease Name Prudhoe Bay Unit 10 Well Number DS 3-13 11 Fmeld and Pool Prudhoe Bay Unit Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF (Submit m Tr~phcate) (Submit ~n Duplicate) Perforate [~: Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair WeU [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulhng Tubing [] (Note Reportmult~plecompiet~onson Form 10~407w~thasubm~tted Form 10-407 for eachcomplet~on) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of startm§ any proposed work, for Abandonment see 20 AAC 25 105-170) ARCO Alaska, Inc. proposes to add perforations on DS 3-13 for selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP WOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 11090-11145' MD (55') 11160-11190' MD (30') 11224-11234' MD (10') 11294-11314' MD (20') Ref: BHCS 11/25/79 Subsequent Work Reportecl RECElVEB JAN 3 11984 Alaska 0ii & Gas Cons. Commission Anchorage 14 I hereby certify that th~,foregomg ~s true and correct to the best of my knowledge Regional Engineer S,gned .-.- /___ T,tle The space below for Commission use Date Conditions of Approval, ~f any Approved by 6RIG1NkL I~Y l~H~i£ C. SMITll COMMISSIONER Approved Ret~rnecl By Qrder of the Commission Date Form 10-403 Rev 7-1-80 Submit "Intentions" In Trlpl~cate and "Subsequent Reports" ~n Duplicate Post Officea,~"-x 360 Anchorage{ ,ska 99510 Telephone-~ .. ~ 277 5637 December 16, 1982 RE: ARCO Pressure Surveys D.S. 3-8 l 1-20-82 D.S. 3-13 12-3-82 D.S. 3-15 ll-21-82 D.S. 6-4 12-2-82 D.S. 6-11 ll-ll-82 D.S. 6-12 ll-ll-82 DiS. l 1-6 11-7-82 D.S. 11-7 11-7-82 D.S. 13-1 10-22-82 D.S. 13-3 10-23-82 D.S. 13-5 10-29/31-82 D.S. 13-22 11-22-82 D.So 13-23A 10-12-82 D.S. 13-24 11-19-82 Static Survey Pressure Build-up Static Survey Pressure Bui 1 d-up Static Survey Static Survey Static Survey Static Survey Static Survey Static Survey Pressure Bui ld-up Static Survey Static Survey Static Survey Camco Gearhart Camco Otis Camco Dresser Camco Camco Camco Camco Camco Camco Camco Camco D.S. 17-5 11-18-82 Static Survey Camco 17-6 11-18-82 Static Survey Camco Please sign and return the attached copy as receipt of data. Becky Benedict AFA- 403 Trans. #662 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON ARCO Alaska Inc IS a .qubs,d~ary of AtlanhcRicnf,eldComp~n., EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS Post Off~ce Box 360 Anchorage.[ ~ka 99510 Telephone ~ 277 5637 September 21, 1982 Reference: Arco Pressure Data D.S. 2-lA 9-3-82 D.S. 2-18 9-1-82 . .D_,_ S_,_.3.~1_3_. 9-8-82 D.S. 12-7A 7-3-82 D.S. 12-8B 7-6-82 D.S. 12-10 6-18-82 D.S. 12-11 6-17-82 D.S. 12-13 7-30-82 Pressure Buildup & Buildup Rpt. Pressure Buildup & Buildup Rpt. Static Survey & Static Rpt. Pressure Buildup & Buildup Rpt. Pressure Buildup & Buildup Rpt. Pressure Buildup & Buildup Rpt. Pressure Buildup & Buildup Rpt. Pressure Buildup & Buildup Rpt. Otis Otis Otis Sch DA Sch Sch GO /Please sign and return the attached copy as receipt of data. Kelly McFarland _ AFA-403 Trans. # 488 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON DALLAS ARCO OII and Gas mpany North Alas~ isJ;~c! Posl Oil,ce Box 360 Anchorage Alaska 99510 Telephone 907 277 563Z Jerry A Rochon D~slHcl Operal~ons £ng~neer July 27, 1981 Reference: ARCO Pressure Data [~.'T~'.16-[' 7/12/81 p.S.4-5 5-7/8-81 ~' "' "- '"" 7/11/81 Pressure Survey Pressure Survey Pressure Survey (Printout only) z/Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #460 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLIHG GETTY ENG. MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHO~I STATE OF ALASKA CHEVRON ARCO LO~I and "' ~s C ~ ~ ~.) iny ~.. ,g~ s,On Ol AIl ] ~hC R,chl,~ IdCoFnp,l.¥ ARCO Oil and Gas Company North Alas~' strict Post Oftice~. x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon Distrmct Operations Engineer April 22, 1981 Reference: ARCO CASED HOLE FINALS D.S.3-13 4/5/81 RES :-i'3 -1 2 -- _ 10EOL ~G tSTAT T~C LS_TA___T T~C - CO N F-F-~-~-: Collar Log/Gyro CorJ~F:tion Run 2 2"/5" D.S. 16-12 4/3/81 CBL/VDL Run 1 5" '~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #208 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO O,I and Gas Company ,s a D,v[sion of AtlanhcR~chheldCompany EXXON MOB I L GETTY PHILLIPS SOHIO , i ii ~ znmmm~ ' .... I i I ~ ' i iii inl iiiii imF] iiiiiii i II i i,m ilrllnlr' ,.l~r~- mm ..... .~1 i ARCO Oil and Gas_Company North Alast~' ~strict Post OfficeX .,x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 16, 1981 Reference: ARCO CASED HOLE FINALS 2/27/81 D.S.3-13 2/27/81 D.S.4-8 3/3/81 D.S.4-8 3/2/81 D.S.4-8 2/27/81 D.S.4-8 3/7/81 D.S.13-12 2/4/81 D.S.16-3 3/5/81 D.S.16-3 3/4/81 D.S.16-8 2/22/81 D.S.16-9 3/4/81 Collar Log Fluid Density Collar Log/Set Packer Collar Log/Perforate PFC Log Collar Log/Gamma Ray CCL W/Sperry Gyro Collar Log/Gyro Corr. CNL/Gamma Ray 511 Run 1 5" 11 5I! 1! 5" Run 1 & 2 5" Pun l Collar Log/Gyro Corr. Run 1 CBL/VDL Run 1 ~Please sign and return the attached copy as receipt of data. 2"/5" 2"/5" 5" Mary Kellis North Engineering Transmittal #125 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO OH and Gas Company ~s a DIws~on of AtlanhcR~chheldCompany EXXON MOBIL GETTY PHILLIPS SOHIO R rEI ED CHEVRON ~ - MAR B Nast~ 0it & Gas Cons. Commission Anchorage ARCO Oil and Gas~,.Company North Alas~ lstrict Post Oflice~_ .~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer March 10, 1981 Reference: ARCO Cased Hole Finals D.S. 16-8 2/20/81 D.S.16-3 2/24/81 Collar Log/Gyro Correlation CNL/Multi-Spaced CBL/VDL D.S. 16-8 2/22/81 CBL/VDL D. S. 13-12 2/20/81 CNL/Multi-Spaced Run 1 Run 1 Run 1 Run 1 Run 1 ~ I ,~T,AT ~c I CONFER: RLF: .... 1! 5tl ~Please sign and return the attached copy as receipt of data. MAry F. Kellis North Slope Engineering Transmittal #116 DISTRIBUTION NORTH GEOLOGY EXXON R & g MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS STATE OF ALAS~ CHEVRON ARCO Oil and Gas Company is a Division of AtlanhcRichheldCompany ARCO O~1 and Gas Con,party North Ala.~ O~stnct Post Ofl~c~ ,x 360 Anchorage:' ,-~laska 99510 Telephone 907 277 5637 Jerry A Rochon Dmtrlct Operations Engineer Feb 6, 1981 Reference: ARCO CASED HOLE FINALS D.S.3-10 D.S.3-10 D.S.6-1 D.S.6-9 D.S.6-9 D.S.6-13 D.S.6-14 D.S.6-15 D.S.7-12 D.S.9-18 D.S. 13-3 D.S. 14-7 D.S. 16-16 D.S.16-16 D,S.16-16 2/10/80 2/10/80 1/11/81 1/14/81 1/14/81 1/16/81 1/16/81 1/4/81 1/lO/81 1/!1/8! 1/19/81 1/15/81 1/12/81 1/-2/81 1/21/81 1/13/81 Spectralog CNL/Gamma Ray Collar Log DDNLL Spinner Log DDNLL Spinner Log Spinner Log Spinner DDNLL DDNLL DDNLL DDNLL Collar Log/Gyro Corr. CNL/Gamma Ray ACB/VDL atl~%se sign and return the ched copy as receipt of data. Mary Kellis North Engineering Transmittal #53 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON Run 2 Run 2 Pass#2 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 Run 1 11 5" 5" 5" 5" 5" 5" 5" 5" 5~' 2" & 5" (on same log) 5~ 5~, · RECEIVED FEB 1 0 ]981 Alaska 0il & Gas Cons. Commission Anch0ra!]e ARCO OII and Gas Company ~s a D~ws~on ol AllanhcRichl~eldCompany ARCO Oil and Gas( ,pany North Slope D~strtct Posl Othce Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 2, 1981 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservati on Commi ssi on 3001 Porcupine Drive Anchorage, Alaska 99501 1 ENG I 4 ENG M 1 GEOl. 13GE _~11 STAT T~C ,STAT TEC '1 CONFER: FILl=: Subject: DS 2-9 DS 3-13 DS 6-15 DS 1 5-21 DS 16-11 Kuparuk B-2 C-2 C-3 Dear Sir- Enclosed please find' l) The subsequent Sundry Notices for DS 2-9, DS 3-13 and DS 6-15. 2) The Completion Reports for DS 15-21, DS 16-11, B-2, C-2 and C-3. Please note that the Completion Reports for DS 14-10, DS 15-10, DS 16-1, DS 16-16 and B-1 will follow shortly. Sincerely yours, /~ ~=P. A. VanDusen District Drilling Engineer PAV'sp Enclosures RECEIVED FEB - 1981 Alaska Oil & Gas Cons. Commls$1o~ Anchorage ARCO 0~1 and Gas Company is a D~wslon o~ AtlarH,r R*rhfleldg, u P~ '~~- " STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION C~,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 2. Name of Operator DRILLING WELL [] COMPLETED WELL RECEIVED ARCO Alaska, Inc. :3 Address FEB - 3 ]98] P.O. Box 360, Anchorage, ^laska 99510 4. Locat,on of We,, Naska 0il & Gas Cons. C0mmiss Anchorage 847' FSL, 912' FWL, Sec ll, TION, R15E, UM 5 Elevation in feet (indicate KB, DF, etc.) 64' RKB 12. 6 Lease Designation and Serial No. ADL 28328 OTHER [] 7 Permit No 79-21 8 APl Number 50- 029-20399 9. Unit or Lease Name ~n Prudhoe Bay Unit 10. Well Number DS 3-13 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing r-1 stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans F"] Repairs Made [~ Other Pull Tubing [] Other [] Pulling Tubing I'-I (Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion ) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertment dates, including estimated date of startmg any proposed work, for Abandonment see 20 AAC 25 105-170) Objective' Squeeze off water producing zone and reperforate. Repair operations commenced 12/25/80. Perforated 5~"2 tbg f/10,794'-10,796' w/4 SPF. Pressure in- creased f/0-850 psi. Displaced diesel w/drill-S pill and NaCl/NaBr. Lost 176 bbls to form while spotting pill. Circ & cond mud. NU & tstd BOP stack to 5000 psi - ok. Pulled 5½" tbg, PBR and K-anchor. RIH to mill top PKR & pulled same. Circ NaC1/R-aBr to reduce gas bubble. RIH to mill bottom PKR & circ NaC1/NaBr to reduce gas bubble." Pushed PKR to 10,820'. Perfd~-5/8: csg f/11,423'-11,425_' w/8 spf. Set ret @ 11,408' Pumped 200 sx Class G cmt and squeezed into form. Drld qg~, il q30' w/8 snf Set ret and attempted to establish cmt to 11,435'. Perfd il,~.-v -..,~ ,,, r · inject rate w/3000 psi - no leakoff. Drld-out ret. Ran WSO tst - had 350' rise in 2 hrs. Set RTTS @ 11,337' & broke down perfs f/11,328'-11,330' w/3200 psi. Reperfd f/11,328'-11,330 w/2 spf. Set RTTS and staged press to 2500 psi - pumped in @ ½ BPM to ¼ BPM; staged press to 3800 psi - pumped in 1½ BPM. RIH w/ret & set @ 11318' Pressured up to 4500 psi - no injection. Abandoned squeeze operation. Ran 5½" ~ompletion assy & tstd 5½" x 9-5/8" annulus to 2500 psi - obtained an inject rate of 3 BPM @ 600 psi. POOH w/5½" completion assy. RIH w/RTTS & determined leak @ lower F.O. Recmtd 9-5/8" x 13-3/8" annulus w/300 sx Permafrost cmt. Tstd 9-5/8" x 3~"2 annulus to 2000 psi - ok. Ran 5½" completion assy. Tstd 9-5/8" x 5½". annulus to 2000 psi - ok. ND BOP. NU tree. Displaced well w/diesel. Ran CCL/GR. Set SSSV @ 2229'. Tstd tree - ok. Secured well & released rig @ 1200 pm, 1/20/81. 14 I hereby cert,fy that the foregoing is true and correct to the best of my knowledge The space below for Commission use Cond)t~ons of Approval, if any Approved by By Order of COMMISSIONER the Comm,ss~on Date ~ Submit "1 ntent~ons" ,n Trlphcate Form 10403 Rev 7-1-80 and "Subsequent Reports" m Duplicate · . ARCO Oil and Gas Company North Alas( ~istrict Post Othce'DOX 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon January 28, 1981 District Operations Engineer Reference: ARCO Cased Hole Finals 1/21/81 P.S.5-14 1/21/80 Gamma Ray Run 1 5" Casing collar log & perforating record D.S.5-14 1/24/81 CNL Run 2 5" P~lease sign and return the attached copy as receipt of data. Mary Kellis North Engineering Transmittal #23 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY SfATE OF ALASKA ,--x' ... ,R.,,E,,C.EIVED EXXON MOB I L Alaska 0il & Gao Cons. Commission Anchorage GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO 011 and Gas Company is a Dlws,on of AtlanhcR~chheldCompany ARCO O~1 and Gas Company North AI;~¢~ D~slmct Post Oil,a- aox 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A Rochon Dmtrmt Operations EngIneer January 27, 1981 Reference: ARCO Cased Hole Finals D.S.I-17 1/9/81 D.S.3-8 1/8/81 1/17/81 D.S.6-11 1/18/81 D.S.6-12 1/15/81 D.S.6-15 1/12/81 D.S.14-5 8/22/80 D.S.15-10 1/11/81 D.S.15-10 1/11/81 D.S.16-1 1/12/81 D.S.16-1 1/12/81 DDNLL Run 1 5" DDNLL Run 2 5" Collar log Run 1 5" Spinner Run 1 5" Spinner Run 1 5" Collar log Run 1 5': DDNLL Run 1 5" Collar log/Gyro correlation Collar log/Gyro correlation CNL/Multi-Spaced Run 1 5" Collar log/Gyro correlation ~Please sign and return the attached copy as receipt of data. 1! 2"/5" (same log) Mary Kellis North Engineering Transmittal #17 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO OH and Gas Company ~s a O,w$*on of AllanhcR~chl~eldCompany EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON ? ARCO Oil and Gas Company North Alasl~ istrict Post Ofhce i.,ox 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer January 9, Reference: 1981 ARCO Cased Hole Finals 12/25/80 D.S. 17-5 11/lO/8O Perf log Collar log Ru~ 1 Run 1 .~STAT TEC~ Please sign and return the attached copy as receipt of data~ Mary F. Kellis North Engineering transmittal #963 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOB I L ~ETTY , ,.4 .:...lIE C !I YE D SOHIO MARATHON Naska Oil & Gas Cons. Commission ~c~rage CHEVRON ARCO 0~1 and Gas Company is a Diws~on of AtlanbcR~chf~eldCompany ARCO Oil and Ga., ,mpany North Slope ,...strict Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 November 10, 1980 Mr. Hoyle Hamil ton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject- DS 3-13 (33-14-10-15) Permit No. 79-71 Dear Sir' Enclosed is our Sundry Notice detailing the work to be done on the above mentioned well. Very truly yours, P. A. VanDusen District Drilling Engineer PAV:sp Enclosure ARCO 0~1 and Gas Company is a Division o~ AtlantlcRIchfleldCompan¥ Form 10-403 REV. 1-10-73 Submit "Intentions" In Triplicate & "Sul~equent Reports" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Oo not use this form for proDosM$ to drill or to demon Use "APPLICATION FOR PERMIT--" for such proposals.) O,L I'TI GAS r-i WELLL..qJ WELLU OTHER 2. NAME OF OPERATOR Atlantic Richfield Company 5. APl NUMERICAL CODE 50-029-20399 6. LEASE DESIGNATION AND SERIAL NO. ADL 28328 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit ADDRESS OF OPERATOR 9. WELL NO. P.O. Box 360, Anchorage, AK 99510 DS 3-13 (33-14-10-15) 4. LOCATION OF WELL At surface 847'N & 912'E of SW cr Sec 11, TlON, R15E, UM 13, ELEVATIONS (Show whether DF, RT, GR, etc.) 64' RKB 14. Check Appropriate Box To Indicate Nature of Notice, 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 14, TlON, R15E, UM 12. PERMIT NO, 79-71 3oft, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT ' MULTIPLE COMPLETE SHOOT OR AClDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: . WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) (NOTEI Rel~ort results of multiple completion on Well COmDletlort or Recompletion Report and Log form.} 15, DF. SC RIBE PROPOSED O R COMPLETED OPERATIONS (Clearly state all Pertinent ~letells, and give pertinent dates, incluchng estimated date of starting any proposed work. Atlantic Richfield Company proposes to shut off water production by squeeze cementing. The 5½" tubing will be pulled and the production and isolation packers retrieved. One cement squeeze will be done through perforations at 11,328-11,330' the other squeeze will be done at 11,423-11,425'. New plastic coated tubing will then be run. A 13-5/8" 5000 psi RSRRA BOP stack will be used. The well will be reperforated if necessary. Perforated intervals will be reported on the subsequent report. The BOP equipment will be pressure tested each week and operationally tested each trip. Necessary provisions for subsurface safety equipment will be rerun. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator, tested to working pressure, will be used on all wireline work. Well will be flowed to production facilities during testing. The downhole safety valve will be installed and tested upon conclusion of the job._ Estimated start date' 11/20/80 RECEIVED Subsequent Work Ite~ortec~ on Form No. ~ Dated ..~--l-~-~J' 1 3 15 0 Alaska 0il & Gao Cons. Commission Ai~cho,'agu SIGNED .. ' - ~"~'"'"t~r~'"'''~ TITLE District Dril 1 ing Eng. 'This space '°r State °f flc~'' ~~~- TITLE CO~MlSSlON~1~ CONDITIONS OF ~ROVAL, IF A~: BY ORDE~ OF THE C0r:~r~ISSION See Instructions On Reverse Side DATE 11/10/80 DATE //-/4 _.:,/,7/sc Form 10-403 REV. 1-10-73 Submit "Intentions' In Triplicate & "SubSm:luent Rel~orts" In Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for prooosab to dwi or to deepen Use "APPI-ICATION FOR PERMIT--" for ~uch proposals.) oil ITl GAs I--1 WELLIAI WELL L...J OTHER NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360, Anchorage, AK 99510 4. LOCATION OF WELL At surface 847'N & 912'E of SW cr Sec 11, TION, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 64' RKB 14. Check Appropriate Box To Indicate Nature of Notice, Re APl NUMERICAL CODE 50-029-20399 LEASE DESIGNATION AND SERIAL NO. ADL 28328 7. IF INDIAN, ALLOT'rEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 3-13 (33-14-10-15) 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Fi el d-Prudhoe 0il Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 14, TION, R15E, UM 12. PERMIT NO. 79-71 )oft, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR AClDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: . WATER SHUT-OFF E~ REPAI RING WELL FRACTURE TREATMENT H ALTERING CASING SHOOTING OR AClDIZING ABANDONMENT* (Other) (NOTE; Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of starting any proposed work. Atlantic Richfield Company p~oposes to shut off water production by squeeze cementing. The 5½" tubing will be pulled and the production and isolation packers retrieved. One cement squeeze will be done through perforations at 11,328-11,330' the other squeeze will be done at 11,423-11,425' New plastic coated tubing will then be run. A 13-5/8" 5000 psi RSRRA BOP stack will ~e used. The well will be reperforated if necessary. Perforated intervals will be reported on the subsequent report. The BOP equipment will be pressure tested each week and operationally tested each trip. Necessary provisions for subsurface safety equipment will be rerun. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator, tested to working pressure, will be used on all wireline work. Well will be flowed to production facilities during testing. The downhole safety valve will be installed and tested upon conclusion of the job._ Estimated start date' 11/20/80 ECi:iVED I hereby certify that the~~ APPROVED BY r' /~~ TITLE DATE CONDITIONS OF ~ROVAL, IF ~/ BY ORDER OF THE CO~MISSiON See Instructions On Reverse Side Approved ARCO Oil and Gas~'"mpany North Alask~t, strsct Post Ofhce Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operahons Engineer September 23, 1980 Reference: ARCO Cased Hole Finals 7/17/80 Spinner 5" D.S. 6-3 7/7/80 Caliper Run 1 5" D.S. 6-11 8/3/80 Diff Temp Run 1 5" D.S. 6-13 6/7/80 CCL Run 1 2" & 5" D.S. 7-6 7/24/80 Diff Temp Run 1 5" D.S. 12-1 7/18/80 Spinner Run 1 5" D.S. 12-1 7/20/80 Spinner Run 2 5" D.S. 12-1 7/18/80 Diff Temp Run 1 5" D.S. 12-6 6/23/80 Sonan Run ] 5" D.S. 12-6 6/23/80 Spinner 5" D.S. 17-1 8/5/80 Diff Temp Run 1 5" p.s. 17-1 7/15/80 CBL/VDL Run I 5" ~~e~e sign and return the attached copy as receipt of data. COMM RES ENG I 1 ENG I 2 ENG J 3 ENG 4 ENG 1GF_OL STAT TEC -- STAT TEC rF~NFER: Mary F. Kellis North Engineering TRANSMITTAL #604 DISTRIBUTION North Geology Exxon R & D Mobil Drilling Getty Eng. Manager Phillips D & M Sohio Geology Marathon State of Alaska Chevron ARCO OH and Gas Company ts a O~ws,on of Atlant~cRichheldCompany ARCO Oil and Ga~l[ ,"npany Tc,-:.phc,pe SO? ~ ? 5- ~ Cc~--,~a,-y 2,4, .... Reference' COMM 1ENO _~ 4 ~NG ~ 3 STAT TEC STAT TEC CONFEm " -FILF~- Enclosed are Directional Surveys for the following ARCO wells' ~~ 11/4/79 Single Shot Eastman / "uS-. ~ 10/29/79 Single Shot Eastman _ D.S. 12_~6~ 1/16/80 Single Shot Great Land /~a~se sign and return the attached copy as receipt of ~ K.J. Sahlstrom -' · ~ ~rth Engineering TRANSMITTAL # 032 DISTRIBL~ION ~North Geology R & D Drilling ~Eng. ~nager Geology ~State of Alaska Mobil Getty Phillips VSohio Marathon Chevron ARCO Off and Gas Company North Ala( O~stnct Post Off:ce Bo× 250 Anchorage, Alaska 99510 Telephone 907 277 5537 Jerry A. Rochon District Operations Englneer September 15, 1980 Reference: ARCO Cased Hole Logs D.S. 2-15 7/9/80 Collar Log/Gyro Run 1 2&5" D.S. 2-15 7/9/80 CNL 7/17/80 Flid Dens D.S. 3-13 7/11/17 Diff Temp D.S. 3-13 7/13/80 CBL/VDL D.S. 4-4 8/27/80 Caliper D.S. 12-7 6/24/80 Sonan D.S. 12-7 6/24/80 CBL/VDL D.S. 12-7 6/23/80 Fluid Dens D.S. 12-7 6/24/80 Diff Temp Run 1 5" Run 1 5" Run 1 5" Run 1 5" Run 1 5" Run 1 5" Run 1 5" Run 1 5" Run 1 5" D.S. 12-7 6/24/80 Spinner ,, CONFER. FILF: P~~lease sign and return the attached copy as receipt of ~ata M.F. Kellis North Engineering TRANSMITTAL #593 DISTRIBUTION North Geology R & D Drilling Eng. Manager D & M Geology State of Alaska Exxon Mobil Getty Phillips Sohio Marathon Chevron AI:ICO Oil and G ]$ Company Is a D,vJs,on of All3nhcRlchlieldComp'~n¥ ARCO Od and Gas Company Ala$~ i~ 5tr~Cljlr Post Otllce B~ j60 Anchorage, Ala~ska 99510 Telephone 907 277 5637 ~ay 5, 1980 · Reference: ARCO Pressure Surveys · D.S. 3-11 2/25/80 Static D.S. 3-12 2/23/80 " L .S, " '- O:~. 3-~" -- 3/2/80 Static D.S. 6-1 3/24-25/80 Buildup /D<~ 14-5 3/17-19/80 ~ Buildup Please sign and return the attached copy as receipt of data. ' K. J. Sahlstrom North Engineering TRANSMITTAL #277 DISTRIBUTION North Geology Exxon R ~ D Mobil Drilling Getty Frog. Manager Phillips D ~ H , Sohio Geology Marathon S~a~e o£ Alaska Chevron ARCO Oil and Git Company 15 s, Divlston of Atlanl,cRIchheldComp~ny ARCO Oil and Gas~' .npany -' O,',:e F, · March 28, 1980 Reference' ARCO Magnetic Tapes ~ 3/14/80 CN 8800-11820 -- D.S. 7-10 1/20/80 Tape #60217 D.S. 9-9 1/26/80 Tape #60250 D.S. 12-6 12/25/79 Tape #60131 ~ease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSHITTAL # 242 DISTRIBL~FION North Geology R & D l~'illing Eng. ~nager Geology State of Alaska F~xxoIl Mobil Getty Phillips Sohio Harathon ~]~e~on Anchomg~ ARCO 0~1 and Gas Company ;'~cho~aq,- Aia%!',~ r'~5~O Tclnpi'O~ .... !07 2,1 55q7 March 13, 1980 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Ak 99510 Subject: DS 3-11, Permit No. 79-47 DS 3-12, Permit No. 79-58 DS 3-13, Permit No. 79-71 DS 3-14, Permit No. 79-82 NGI #13, Permit No. 78-91 NGI #14, Permit No. 78-92 > 3 'STAT T~ Dear Sir' Enclosed please fi nd Completion Reports and Perforating Histories for the above-mentioned wells. Production information for these wells will be sent as soon as it is available. Very truly yours, P. A. VanDusen District Drilling Engineer Enclosures ARCO Od and Gas Co,'npany Is a D,ws~on of At~anhcRich",eldCompan/ Form P--7 SUBMIT IN DUP'. ~:* STATE OF ALASKA (see o~.er in- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la TYPE OF WELL OIL GAS r-'] WELLE~ WELLL_J DRYO Other b TYPE OF COMPLETION NEW I"X"l WORK DEEP-I---I PLUG I-'-] DIFF WELLI~.J OVER [~] EN I I BACKI I RESER F"'l Other 2 NAME OF OPERATOR Atlantic Richfield Company 3 ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4 LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 847'N & 912'E of SW cr Sec 11, T10N, R15E, UM At top prod interval reported below 1769'N & 695'W of SE cr Sec 14, T10N, R15E, UM At total depth 1321'N & 300'W of SE cr Sec 14, T10N, R15E, UM 5 APl NUMERICAL CODE 50-029-20399 6 LEASE DESIGNATION AND SERIAL NO ADL 28328 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT, FARM OR LEASE NAME Prudhoe Bay Unit DS (3-13~ (33-14-10-1 5) 1(~ FIEI::~Q_A~D P~)OL. OR WI[,~D(;AT yruanoe uay rlela Prudhoe Oil Pool 11 SEC ,T, R , M , (BOTTOM HOLE OBJECTIVE) Sec 14, T10N, R15E, UM 12 PERMIT NO 79-71 ~311/5/79DATE SPUDDED I1~" 11/25/79DATE T D REACHED 112/4/79(2/26/801'" ~ o. )!16 ELEVAT,~F. RK,. RT.~/RKB GR. ETCr 1~7 ELEV CAS,NGHEAD 9350T' HOW MANY* ' 21 ROMAR LS INTERVALS DRILLED BY CABLE TOOLS 11925'MD 9~16'TVD Ill§~r~[¥MD VU I Sinqle 23 WAS DIRECTIONAL 22 PRODUCING INTERVAL(S), OF THIS COMPLETION - TOP, BOTTOM, NAME (MD & TVD)* I SURVEY MADE Top Sadlerochit ll,060'MD 8791'TVD Il Yes Base Sadlerochit 11~792'MD 9320'TVD 24 TYPE ELECTRIC AND OTHER LOGS RUN 25 DIL/SP/BHCS/CAL/GR, FDC/CNL/CAL/GR, CNL/CCL/GR CASING RECORD (Report all strings set in well) 20" 194# Welded IH-40 I 80' I 3O" i3-3/8" I/Z# Butt I L-80 I 2729' 17-1/2" ,-b/~" 14/~ Butt l S-95 I 11,877' 12-1/4" LINER"R ECORD 26 SACKS CEMENT* CEMENTING RECORD 550 sx Arcticset cmt 6400 sx Permafrost cmt 1500 sx Class G cmt TUBING RECORD 27 SIZE 5-1/2" AMOUNT PULLED DEPTH SET (MD) PACKER SET (MD) SIZE TOP (MD) BOTTOM (MD) 28. PERFORATIONS OPEN TO PRODUCTION .. ql ,284'-11,294' ;~ ~1,264'-11,284' ~11,204'-11,224' ~,,~'~ , ~.1,,1.94'-11,204' (Interval, size and number) SCREEN (MD) 10,850' 10,985' 29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC DEPTH N/AINTERVAL (MD) .,t~AM~UNT' ," ,, "-,' ~AND KIND.. ',,OF MATERIAL~USED / PRODUCTION ~j DATE FIRST PRODUCTION IPRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) ' I WELL STATUS (Producing or N/A I ,,'~,,~,., "" /,,s, hqt-ln) DATE OF TEST IHOURS TESTED CHOKE SIZE I PROD'N FOR OIL-BBL iGAS-MCF '"' ~/ATI~R--B~I_' ~"~"II JGAS--OIL RATIO ; PREssFLOWTUBING IICASING PRESSURE 24'HOURRATE ICALCULATED OIL-BBL [ GAS--MCF IWATER-BBL IOILGRAVITY-API (CORR ) 31 DISPOSITION OF GAS (Sold, used for fuel, vented, gtc ) ITEST WITNESSED BY 32 LIST OF ATTACHMENTS Perforating Hi story 33 I hereby certify that the f_orego~ng and attached information is coynplete and correct as determined from all available records S,GNED ,~. ,~,... ~/~E.~Z~L.~. _ T,TLE District Drilling Engineer *(See ~nstructions and Spaces for Additional Data on Reverse Side) DATE 3/14/80 INSTRUCTIONS General Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska Item: 16: Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements given ~n other spaces on thru form and ~n any attachments. Items 20, and 22. If th~s well ~s completed for separate production from more than one ~nterval zone (multiple com- plet~on), so state ~n ~tem 20, and ~n ~tem 22 show the producing ~nterval, or ~ntervals, top(s), bottom(s) and name(s) (~f any) for only the ~nterval reported ~n ~tem 30 Submit a separate report (page) on th~s form, adequately ~dent~fled, for each additional interval to be separately produced, showing the additional data pertinent to such ~nterval Item 26. "Sacks Cement" Attached supplemental records for th~s well should show the detmls of any multiple stage cementing and the location of the cementing tool Item 28: Submit a separate completion report on th~s form for each ~nterval to be separately produced. (See ~nstruct~on for ~tems 20 and 22 above). 34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS NAME MEAS. DEPTH TRUE VERT. DEPTI None Top Sadlerochit 11,060' 8791' Base Sadlerochit 11,792' 9320' 36 CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER None Perforating Hi story DS 3-13 (33-14-10-15) API 50-029-20399, ADL 28328, Permit No. 79-71 Began perf operations @ 0600 hrs 2/26/80. Installed & tstd wireline BOP's. Perf'd intervals from 11,284'-11,294', 11,264'-11,284', 11,204'-11,224' and 11,194'-11,204' w/4 spf. Ran HP press bomb. Flowed well. Set SSSV. In- stalled & tstd tree cap to 5000 psi. Released well to Production Department @ 1800 hrs 2/27/80. ~F~CO Oil and Gas Company February 11, 1980 Reference' Inclosed is a Magnetic Tape for the following ARCO well' D.S. 3-13 11/25/79 Tape #60042 ~lease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering ~' B~ r D[~ FRt. ~. t ION North Geology Jh'i. llJng Eno ~,!anaqer geology State of Alaska 5iob51 Gott y Phi 1 lips Sol~ i o ~larathon Chevron Februa~3: 6, 1980 Reference' .Enclosed are Cased Hole Logs for the following ARCO wells' D.~- .S-l~. 12/19/79 CCL & Perf. Record Run 1 ,~S 5-13]~ 12/17/79 CCL Run 1 /~. '9-2 1/13/80 CNL Run 2 Please sign and return the attached copy as receipt of data. 2 & S" (same log) 2 & 5" (same log) 5" K. J. Sahlstrom North Engineer ing TRANSblITTAL # 07 6 ARCO Od and GassCompany January 24, 1980 Reference' Enclosed are Directional Surveys for the following ARCO wells' ~ 11/4/79 Single Shot Eastman D.S. 6:9 10/29/79 Single Shot Eastman p . 12-6 1/16/80 Single Shot Great Land Please sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSMITTAL # 032 DISTRI B~fFtO× North Geology R & D Drilling Eng. Manager D & 5I Geology State of ~aska ~OR Mobil Getty Phillips Sohio 5Iarathon ~e~on l)cccmbcr %1, ]979 Re fe reno e · Lnc]osed are Directional Surveys £or the following ARCO we] 1 s' D. g_...3_-] 2 12/20/7.o, Gyroscop5 c East, nan ] 2/20/79 Gyroscopic Enstlnan ~..~ Pier, se s.~gn and l'elt]r~t t]~e att'ached copy as receipt o F data. ,. ,]. Sahlstrem Nort]~ lh~i neerin.q ]'IITJS'[]']'~I'.~]. /' 539 1)I~''', ,.1 kl t;trl'l O\' ARCO Oil and Ga.5,'~.ompany F',', ' '.~; .. , .... T~'-~.. ~.~ ~ ~7 .5'-' December 21, 1979 Reference: Enclosed are Cased Hole Logs for the following ARCO wells- ENG __4 ENG 1 GEOL __ ._ STAT TE.~..%,~r"-'"~ STAT TE~" CONFER: t FILF: -- 11/29/79 Compensated Neutron/GR Run 1 5" 5,S. 4-15 11/26/79 " " Run t 5" D,S, 6-9 11/28/79 Compensated Neutron/GR ~ i 5" D.S. 7-11 11/7/79 Spinner Survey ~ 1 5" D.S. 7-13 11/9/79 " " ~n I S" p . 7-14 11/12/79 Spinner Survey Run 1 5" Please sign and return the attached copy as receipt of data. · K. J. Sahlstrom North Engineering TR&NS~!ITTAL # 530 DISTRIBL~ION North Geology l~illing Eng. Manager D&~ Geolo§y Sta~e of Alaska F~xxon Mobil Getty ~'~illips Sohio Harathon Q~e~on ARCO Oil and Gasff'ompany. December 19, 1979 Reference: Enclosed are Open Hole Logs for the following~uRCO well: D.s, 3-13 11/25/79 F~C/GG ~Lm 1 " " " FDC/CNL Run 1 5" " " " BHCS ~ 1 2" ~ 5" " " " DIL [am 1 2" & 5" D.S, 3-13 11/25/79 CPL Run 1 St' oP.~ease sign and return the attached copy as receipt data, K. J, Sahlstrom North Engineering COMM RES ENG 1 -ENG 2 ENO 3 ENG 4 ENG 1 GEOL 3 STAT TEC-~_j STAT TEC CONFER: FILF: TRANSMITTAL # 526 DISTRIBLrFION North Geology R&D Drilling Eng. Manager Geology State of Alaska Mobil Getty Phillips Sohio Marathon Che~on RECEIV[D Ar~hurage ARCO Oil and G~ "ompany Alaska Regl, Post Ofhce Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 21, 1979 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 3-13 Dear Sir' Enclosed please find a Competion Report for the above-mentioned well. Very truly yours, P. A. VanDusen District Drilling Engineer /ms Attachments P, FCEIVFD Al:ka Oil & G:~s ARCO OH and Gas Company ~s a D~ws~on of AtlanhcR~chheldCompany Form P--7 SUBMIT IN DUP~ .. * STATE OF ALASKA (see other ~n- structlons on OIL AND GAS CONSERVATION COMMITTEE reverse side) WELL COMPLETION OR RECOMPLETION REPORT AND LOG* WELLI I DRYF-~ Other b TYPE OF COMPLETION NEW ~ WORK DE EP- [~'1 PLUG DIFF WE,LL~ OVER[--i EN ~ BACKF--] RESE. I--I O,her 2 NAME OF OPERATOR ARCO Oil & Gas 3 ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 4 LOCATION OF WELL (Report location clearly and In accordance with any State requirements)* 9951O 5 APl NUMERICAL CODE 50-029-20399 6 LEASE DESIGNATION AND SERIAL NO At surface 847'N & 912'E of SW cr Sec.ll TION, R15E UM At top prod ~¢Jtc,.d, reported below ~ ~ 1769'N & 695'W of SE cr Sec.14, T10N, R15E, UH At total depth 1321'N & 300'W of SE cr Sec.14, TiON, R15E, UM ADL 28328 7 IF INDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT, FARM OR LEASE NAME Prudhoe Bav Unit 9 WELL NO v DS 3-13 (33-14-10-1~ 10~FIELD AND P&;)(-}L OIAWIt,~DCAT - ' vruonoe Bay F~e ~o- Prudhoe Oil Pnnl il 1 SEC . T , R , M , (BOTTOM HOLE OBJECTIVE) Sec.14,T10N,R15E,UM 12 PERMIT NO 79-71 11925'MD,9416'TVq ~-~§4'MD,9350'TVD{ HO~ViMANY' ' 2~ ROTARY TOOLS 'NTERVA'SDR'LLEDBVcAB,ETOOLS ngle All 22 PRODUCING INTERVAL(S), OF THIS COMPLETION - TOP, BOSOM, NAME (MD & TVD)* 23 WAS DIRECTIONAL Top Sadlerochit 11060'MD 8791 'TVD SURVEY MADE Base Sadlerochit 11792'MD 9320'TVD Yes 24 TYPE ELECTRIC AND OTHER LOGS RUN DIL/SP/BHCS/CAL/GR, FDC/CNL/CAL/GR, CNL/CCL/GR 25 CASING SIZE IWEIGHT, LB/FT 20" I94#Welded !3-3/8" 72#Butt 9-5/8" I 47#Butt I CASING RECORD (Report all strings set in well) H-40 I 80' 30" IL-80 1 2729' 17-1/2" I IS-95 I1~R77" 12-1'/4, I 26 LINER RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* SCREEN (MD) CEMENTING RECORD I AMOUNT PULLED I 550 Sx Ar£tic_~P_t cmt. ~4_nn sx Permafrost cmt ] !500 sx Class G cmt 27 I TUBING RECORD SIZE DEPTH SET (MD) I 5-1/2" IORBO' PACKER SET (MD) 1 0~85' 2B PERFORATIONS OPEN TO PRODUCTION N/A (Interval, size and number) 29 ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 30 PRODUCTION PRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) DATE FIRS'[ PRODUCTION N/^ I WE LL STATUS (Producing or shut-In) DATE OF TEST FLOW TUBING PR ESS HOURS TESTED CASING PRESSURE CHOKE SIZE PROD'N FOR iOIL-BBL TEST PERIOD CALCULATED OIL-BBL GAS--MCF 24-HOUR RATE~ I 31 DISPOSITION OF GAS (Sold, used for fuel, vented, etc ) GAS--MCF WATER-BBL ]GAS-OIL RATIO i WATER-BBL I OIL GRAVITY-APl (CORR) I ITEST WITNESSED BY 32 LIST OF ATTACHMENTS Dr~llinq Historv and Gvroscon~c Surwy 33 I hereby cert,f~/ that the foreg~3,ng an[:l attac~ed Information is co-yn-~let; ~d correct as determined from all available records S,6NED ~ ~J' ~'-- TITLE District Drill i ng Engineer · i - i i DATE 12/2!/79 *(See instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General Th~s form ~s designed for submitting a complete and correct well completion report and log on all types of lands and leases ~n Alaska Item. 16. Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements g~ven ~n other spaces on th~s form and ~n any attachments Items 20, and 22.' If th~s well ~s completed for separate production from more than one ~nterval zone (multiple com- plet~on), so state ~n ~tem 20, and in ~tem 22 show the producing ~nterval, or intervals, top(s), bottom(s) and name(s) (~f any) for only the ~nterval reported ~n ~tem 30 Submit a separate report (page) on th~s form, adequately~dent~f~ed, for each additional ~nterval to be separately produced, showing the additional data pertinent to such ~nterval Item 26 "Sacks Cement" Attached supplemental records for th~s well should show the details of any multiple stage cementing and the location of the cementing tool Item 28 Submit a separate completion report on th~s form for each ~nterval to be separately produced (Seelnstruct~on for items 20 and 22 above) 34 SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL. GAS, WATER AND MUD 35 GEOLOGIC MARKERS NAME None MEAS DEPTH TRUE VERT DEPT Top Sadlerochit 11060' 8791' Base Sadlerochil 11792' 9320' 36 CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER None Dri 11 ing Hi story DS 3-13(33-14-10-15) API 50-029-20399, ADL 28328, Permit No. 79-71 Spudded well @ 1800 hrs 11/5/79. Drld 17-1/2" hole to 2750'. Ran 13-3/8" 72# L-80 csg w/shoe set @ 2729'. Cmtd w/6400 sx Pemafrost cmt. Did 20 sx top job. Installed & tstd pkoff to 2000 psi. NU BOPE & tstd to 5000 psi. Tstd Hydril to 3000 psi. Drld cmt, FC, shoe, + 10' new hole. Tstd fora to 12.5 ppg EMW. Drld 12-1/4" hole to ~1192_~]~5' Ran DIL/SP/BHCS/GR & FDC/CNL/CAL/GR logs. Ran 9-5/8" 47# L-80 & S-95 csg w/shoe set @ 11877'. Cmtd w/1500 sx Class G cmt. Pumped 300 sx Pemafrost cmt thru lower FO. Arcticpacked 9-5/8" ann w/Arcticpack thru upper FO followed by 75 sx Pema- frost cmt. Ran GR/CNL/CCL logs. Ran gyro. Ran ink bskt & gage rng. Set isolation pkr on wireline @ 11251'. Ran 5-1/2" tbg w/tai'l set @ 10985' & pkr @ 10850'. Pulled dummy valve. Displ hole w/H20 followed by diesel. RIH w/standing valve, set pkr, jar onto standing valve-POOH. Tstd pkr. Ran 2-3/8" tbg. ND BOPE. NU Xmas tree. Release ri9 @ 1700 hrs 12/4/79. Eastman ~ Whipstock A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO 0IL & GAS COMPANY O.So 3-13 WELL NAME PRUDHOE BAy,, ALASKA LOCATION JOB NUMBER Al179DO094 TYPE OF SURVEY Directional Single Shot DATE 11-4-79 SURVEY BY Jim DeMonia ~FFiCE Alaska J, ~.:L. LJ.L~i. L, V L ,-,: T I C A I.. '...'1',,]'],...~1:, I'.F..'Orl FILE 194 GLC]iO~'~ CALL. UI.A~ED IN F'LANF. C,i'*' £~ I F:L C T I 0 ~*~: i 1' [ L, L,t., _.,~' L.!Ibl~ L F.~L. Tri ~l t: L. [-_ "i A tJ L'~ I J L E -E -- DI .'.]T,',,'IC[ DIR£ CTION - -5,[.V£"RTT',' I F i 1 P ri [i&/loO;-] C, 1 -1.'. 0 9;". 0 9 J . 0 9:'. -- t,. C.O 0. ,...:':)- - 0 .'00' 1,1"". O0 O, Ou .3. O0 2 J.'.-I. O0 0 · 0,2 ,'... OC, , -1, f c, .....0,,) G. O0 ..... O, ,;',3 417. ,gu 0. C:,O O. O0 0. -00 .... O .'-00 ....... CF-' 0 - ..... 0; 00 O, O0 O.C.(.., c., 0 O. 00 O. O0 O. O0 C.. 0 O. O0 0 .-C::O --:--:u. 0,) ........... u"- ........ 0 ,,.: ' ~' t.'. ~"0 (.,. O0 0 0 0. ~., ,.,, L, 07 . u 4.. 0 '../. '..,' 0 ,..'/1 . 0 F.: ?' 4. O (, 'r ,'..),z, · V 91. 92. 91. 9'2. 509,00 o. CO - 0~-00 .:,00.00 0. O0 0.0~., ,'...91. O0 O. O0 O. O0 'o,,-~, ..,~, O0 ...... C;'~ O,J--- 0 · O0 966.00 : 0.00 C..O0 os .o6. ,,.a,,.io '.., o; 149,C'0:'. : '"":,00.. '0,00 241,,J, 0 ' u;O0 ' ' b.O,.) ~";~ OG ' '0.00 ' ' " O" _/ _,~. · · ; 1.24 · ,'., ' 0 · O0 ." o OO 0.00 O. O0 0 0 0,, O0 O. O0 O. O0 0 0 O. O0 O. O0 O. O0 o 0 O. 00 ...... o. o'6 ............. 6 ;b;') ....... o ----cF ........ o. o,::, .... O. O0 O, 0.} 0 0 0. ,.)0 :i'.. 0.00: 0.00 0 0 0.00 '" ' O. O0 0.0,) 0 0 0.,)' O. o0 0.0..', C' 0 ,.,. ,:',} ,',. 0,} 0. ,' ,') ,"._",,', ~. ,,., 7-I 34 ,'4 3 '4 · ' 13 0 · ',,. 'l .. [b 0 . '01 ¥'. 1 LS 0 . .2 o -t ¥. 1 L] .' L, 2c,,"/o ].E: ',.' ',... i ] L LJ[~ ~1 fl Il 19 0 :.; ,i4 -E '- Il,.', I A I- F<LI~') b, Ii, t'it)'.'. ~:2"',to 3b o ',.; i-'.:3 E '.~5>'0:. .tv 0 '-; 3U IL . __ -12 4b '3 .3:::: £.. ,1 :' 0 6 -I J E 4,.' 0 ~. 4.' 0 S 43 L 43 15 ~,-11 L 43 3v ':, .~::3L" -I~ ;,,.,, ¢ ..,' L -1.'. ~',,' ' 2.', L -i.~ JJ ' .'L.,L -~3 ,', ,~, ,.:;,~ f F tJLi[;":: i L_L j',~t~ I J'l ~LLi 5 b 5 5 2 1 1 2 ! i > I -';")"I I ' 1' : J, f r t; ,'l I l t[i:l ,_7 1 o.IS,7. I/' oE:12.91 Y 16"./, 28. 26. 19. ,.t.Z · ::.:.':. ,. 18. OJ. I b, 23. O&', ,, I-]'N¢,I_ L,I.I. JL}~II<F I~] NL L,I iON: Ill Ell ,',N/'E'; 32 ·:., f -,,17 S 33 DEGS ..... .,5.29 F [. ~"l' 11 tllNS J Y SEE',c', F Eastman/ 2 A PETROLANE COM~ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO 0IL & GAS COMPANY D.So 3-13 WELL NAME PRUDHOE BAY, ALASKA LOCATION JOB NUMBER Al179DO094 TYPE OF SURVEY Directional Single Shot DATE 11-&-79 SURVEY BY Jim DeMonia OFFICE Alaska F, i',! 5 I~ [ ,', R :, I ~, ':', Ii I, I I' i i'; ~ i"J-E-- ,qI:',T,',,'IFE DIR£CTIOI'J '0 ,, ~.,, (,0 0 ~ 00- I.', 1-12, O0 0, O0 92. 2.<4. u,] O. O0 91....,.. ,_, .'" .)0. - ' - 0.00- 0.00 O. 00 0.00 O,~ 183. 92. 92. 91. 92. $1. , , -, bO?. O0 o ~ C0 0 [00 ~,',') 0, O0 ,:, 91.00 0 · 00 O. 00 -~-.:':;~, ,-, O0 ...... O, O0 O. · O0 9'66,. O0 0., O0 0. Os;, ] 058.0~. '., ~C:, 00 .... ' ,:,,0o . 11'19. O0" 1241 , 30 '.'. O0 ~ '~'-z~ '.]G ~ 0~. O0 ' ~ O" ] t.. ,i. ,'.,., :3, O0 ' , 00 O. o0 O. O0 0 0 0.00 0. ;J,O o 0 ...... b-. ob-- ........ o .-O,':, ....... t,-- iY ..... O. 00 O. O0 0 0 .... 0,0~0 (.',. uO' 0 0 .. 0.00; 0,00 0 0 O. O0 C. 0,~ C, 0 O, O0 6.00 0 0 O. 0 ) ,". '_') "; '" '1 ',., ¥' I. ...' L .1 i L ]' ,', tl L' I L A F l, I i, D t; t, ,', I I ,c. ['J L l. Jr.; I,A { A ~ F.:ci;l b. IJ. :,,..)o,3. 210 0 b 39 E 3..."",.. ".. 3 b 0 ,.,'J, :3 E 3:.4/'u. -I0 0 '-.;5ti E 5907, -12 4'_, S .:;:; i- 4456° 42".' 0 6 4J. E -15/o 4. -I,/ 0 E, -t,' [ j-I '5 ,~, + -1 Z 0 S -I 3 L. O}",;5, -13 ],.,,. ..c 41 i' ] b'J'J , ~" - '-' ,'Oo, bol,5.52 t, I b, t:~c,l , ..'...' 123, L:; 1,1,,' . 4~ -10;3, t'}' 40.91 CI LJ:.],IlI,,'E- I~] h'~ t ] ION; b :iS I'~I-_GS Iii q1At4C'.L : ": ' ~, ""' , ,c ..... ,..7 FE.'L'I :}t '' ..... - yf: .,dl I: + 4[~1. c,,'._> ]7' SEL'.S I i 0 · f"~ Eastman ~ Whipstock l ~~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTIONAL SURVEY Atlantic Richfield Company COMPANY D.S. 3-13 WELL NAME Prudhoe Bay, Alaska LOCATION JO~ NUMBER A1279G0155 SURVEY BY Max Lund TYPE OF SURVEY Gyroscopic DATE 12-20-79 RECE!VFD Al~ka Oil & G:~s Alaska EastmanWhiRs t o,£ k P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 349-4617 TWX 910-881-5066/Cable: EASTCO December 21, 1979 Atlantic Richfield Co. P.O. Box 1479 Anchorage, Alaska 99510 Well Number: D.S. 3-13 Location: Prudhoe Bay, Alaska Type of Survey: Gyroscopic Method of Computation: Radius of Curvature Date: 12-20-79 Surveyor: Max Lund Job Number: A1279G0155 ATTN: Bob Hines Dear Mr. Hines, I am enclosing the original and one copy of the Gyro- scopic Survey run on the above mentioned well. We wish to take this opportunity to thank you for call- ing on our services and trust that we may continue to serve you in the future. Sincerely, Bob Kiser District Operations Surveyor cc: file enc. BK/bt Direct~onal Dnllers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide EA':'- UR ED,.,BR I F ] 1"iR ~ FI' COURSr:: DEF'TH ANUI..E [~].REC'TION L. ENG'T'I-I FILET' 0 ~i l.i F EE.'t O, 0 G 0 t 00, ,';.. I ..,"' N 89 LJ L 00, 200, 0 30 t; ,~,.. E L00, 300, 0 30 S 55 W 100, 400. 0 SO N 3,3 W 100, 500, 0 2:0 S S,c, W 10,.}, ,-.,00. 0 0 0 100, 700, 0 15 ,S S] E 1.0o, 800. 0 _.~,1 ~ .,':' ""~. F: ] 00, 900, 0 2t) S e,7, E !00. 1000, 0 45 2! 70 E 100, 1100, 0 -)5 ~ S t: 100, J200, 0 ~5 N C.4 F ~00. 1300, 0 0 o 1 O0, J -t ,} O. ~., 0 v "'< 100 o00, 0 0 0 J. O0 ~ Io00, 0 ~':, S 33 IE J. O0, 1700. 0 15 S ,,~'U 100~ ibOO, 0 30 ~ 4o W !00, 1~00. 0 3,'~ N -l'".., i.'.' 1 0,:,.. T'~;~UF' DEi'" f H I-:'E F T V [.= F: T / CAl. S E. C T I 0 N F I:. E' T R E L. 7' A N G U L A IR F~F'T O, 00 O, OO O, O0 " O O u ~ o,"'" 0. ,.'.O 0°46 S 0.36 0,83 1.2,} S 0.,"4 0.3;0 t, r,),:; .,=, J., J.O 6., 62 32,5i 94. c.., ::; E.:8S 0,4"' W ,'.-~5 S 0.,0,.',, W 20 N 0,, '1 L- ;.:'7 N .... 1 F. 29 N 0.21 .,.oN ') ?.,0i',~ O,OL, W ;',9N 0,0~'; W F" L. Li,, '" il. t-,' [: .... I":~ F'T ] tit' ~.. T fi , F'::;..U['itC~E .i:rh¥, 'r r-. '" ~,L:i 'T' J'l ANL,L.E /' E F':. 'i D ~'~ S 0 G 0 ~ 2 ,t:; 31 (,"..:, 4. 31 0 ,]'_",00 ~ Sd) 0 S.400 , 4i it-., 4000, 42 4'f, 410,.) 4. 42 45 4 "00, 4 J 0 4 ..~ 00, -I ~' .I '.., .4. -40 -.~500. 4" -~600+ 42 0 4-700, 42 ~ % .-~ '? 00, 41 .3,J 5C, 00., 42 30 5J. 00,, .42 i.': :'i "00, 42. ,': 0 5300, 42 0 b 4004. ,'~,,." ji ,,) 5500 + a.,..,~) . 56004. 42 0 5700 · 42 --if.., 5900, 4 ,I 9 S L. 0 f' E:, ':, ,19 E 1.004. S 49 [: 100, '5 49' [. I004. S 48 £. ~00, ':, 4¥' E i00. S 48 ¢. JO0. S 4? i:: 100+ E, :9 E. J. O0+ b 48 F.: I004. S `".I. 9 L:' J004. S -!,5 E. .1.00, S 47 E. , ,:!004. S 50 ~_ ~.00, ': 4'"7 I:' ', 10"" f: 4Y E ' .... iO, Q. S 4Y E 100, S -17 t.L S 4U ;." 100, S 44 E J, O0+ S ',~5 E. J. 00 S 42 [.: S 46 F t. o0 S 44 [: J 00 c., .4"' E lt.,O S 4}' E 100, S 48 E 1004. S 45 E 100, S -1,.: E 100, S 4i E I00. (' 0~'i F 'U'T'A T I ON T J PI;" !tA'l' E C'E:: ~ J }., :~ [:J '-'J -.fir: t: C t. 0 S L; J,' i f;J S'I Atlt,~ Dll','r C'f IO~ F k:. I::.. f i~ ~/ 2962,6 4 3049' 4. 66 3133,.87 3214.65 3 "':-> 1 6~: · o e 4. ~12,4.94 S J,i4. ~7' f 1,16,2t S ]8J.,3;:.~ L- 18.1 ,,61 S .'"'2,0J r. ,J.'04.67 S 2'66,1~., F .,,.,., 4. 3',7 -":' 0 /, · _,, ) "'I' + , ,2) o 5 0,4 ;: 716,02 307 + 1 t.; ' 3'.,', S., 9 J t.": 3U"',J.S S 4]4,75 1: 3':..'~,4.C:7 S -I .... ,, ' ' [ 4,.~",Od., ~; -[.,l/'+,:,O L 4874. 25 S 5,')C,.:::: ~: ,: J 8~54 L ,.'> 67 · 78 f. 71C, 7'4 f 7704. 23 E. ,R20, O? E. 8 ?, 9. ,,.: J E'. 9 I 7', 9", [ 1014. f'2 L J 06f',-!-9 F: 1109,5':;' k 1 J. 5'L,,o 7 :.-: [.' t20,' ~ ~.;9 F J. .... ,r;,',].,, -'i I' 4 ;'~.a ~ " '"' 6 '~ 7 0 ,, · ,;.. 6.U 1 , ',.. o 49J6.99 1825.:, 30 4990,87 1 ::} ':.;' 0 4. 67 ,.., 06 S, Y 0 .I ''~''''' 90 5135.77 2026,3:4 ,:,1, I '276, -'.1 J. S J 3,',d, 80 :::, ] };Y2,49 S ~ 42.4~ 40 13;45,62 I:. 13'244. 95 l" t.443,83 I-. ' l 4'¢0 + '; 'f'F. J 5'z', ?":' k" r,) ,, c-i ~J -, ,.b :', ,...., +/, 2,,Yl , ,.,:~.,nOF. BAY~ NOkTH 60 ,) O. 61.000 o400. oL',O0, 43 IL'; 680o. 43 0 ~,?O0. -,1¥ ::'0 O0. ',}.2'. 0 7100. ~..'" 0 7200. 4 'f 0 7,}',,JO. 43 l 5 :'.400, 44 0 7.~ 00+ 44 iL., 7o00. '~.., 0 7700+ 4" t" 7800+ 46 lt,, 7700, .'{'..; ~ 3 8000. 45 4:, 8 [ 00. 4 8200. .-'t '.] ~40,} ~ I'% L* -"' ,:,.., 0 O, 44 0 :...?.600 ,, ,,1.~ 4'., 8700. 43 30 8'200. 43 45 SL,]F'E, 1 r,,' U [: £[R ]' F'1' L'C)URSF: g[i-<l ]. t'~ I RFCT I ON LENGTH I.,E F' I' L~ F' [.; E: t' i-: E f o 4i E. ]00. S 40 L JO0. S 40 E JO0. S 41 E:' lOg. b .43 E. iO0~ S .,10 I] 100, E'; 4 ',.) /:_::" t 00. '"' zi '" IS 0 .., w - S "1]. E JO0. S -iS E I. O0. ., -.~b E. , i S -10 L'-. 'J. O0, S 27 E J S 27." d '~, 100, 54 2 L; LI" L., --I ]. ./.- '.:;717 5 '/9'0 r · oOJ. O 'J SO E. 100, 6301 ', ;% ; .1 ,-, ::, ,...z2Ii I Ou ,, c,o,' ,. :3 ~;.";E. J. O0. S S.-'tF i 0 o,, ,::.':; l" S 35 [ J. 00. 6,, C:ii' CAL. VI'::R 1 ]'CAL i.i .-.':ECl ] Obi 'F i':' ~.' L T · ,., 3 4 E. j. r:., 0. c, 6 '=;" · Z '' :;'") S ,.~4 E' 100. S 2; 4 L;. ]. (:, O, 6 >' °3 S 7, '.., E 100. ,~, 8,:, 3 S 34 E' J. O0, 65'::.) t... F- C 'l',' A i',~'G C 0 0 l;: D t i-LET I 98f'.'. - 2 0 3,',' · .~.6 ,: :J -/.,I. - 8 7 , , J,...I · .-' C) / .1:21.7,25. ,.' .i S 8,6 4 '""; -' J7 U I. A t', AILE, S I ,:,.',<, ~ '-' 2 F S L,:,,;I o J ': L. S 1 'At,,,'9 [ S 1007,08 L' lr,:.;J +'.=,'3 ~' i t;';,',?, ~ ,J,) E i; 1 ¥'9:5' .., -la; L C=l ,': L. t' J:' l' DJc.r' T,',r,/I ~._ .'.Ti j li'~ C T J :.Ii'l i'~'f.l f' ri '.;.:,'L ,' J f ~ £[,.l, i }Or T ,', 77' · ; ,_,; A L A S I(A :-'ASUh:EI'~ 1]RIFI DRIFT 3L:F'Ti t ANGL[. DJ:NEC FION .: i:- ET I~ [~ D 9LO0, 4,5 0 '.; "q E 9300. 43 -1J S 53 E. '2400~ 'l,:, IL, c 34 [ .% .. .- "',' r- E. ;, ".,00 o 4o 4' S ,~,..., 7 0;). 4" 0 b 7.4 F: 9::'~00+ '" 4[, b '"~ 990u+ -19 30 S 3S I:. 1 J. 000 + 43 ",n S -:,c,~ IF: C 0 U F,, ,.> r'. l.. k'NG T'i-I F E E. l 100. I09+ 100+ 100+ ]00. JO0,, ioo. 100. 100. J00+ 100. ] 00+ 100. 100, ::1. O0 .~ J. O0+ J. 00', 100 ,, J. O0 , 00. T[::,L'~E VLF<TtCAL V[-'RTiCAL I',: [- [, l IJE:F'IH SI:C:ilL) N C O 0 6' t L.:E.T F FET A DJ C,~ LJ I_ A F', D ]' N A I [ S kEF. [' 73a, 9+ 07 4162...'.,ti . 7440 ~ 4o 4 ')~ [.'. 66 Z~200. /513., 11 4.~Uo. 36 E,,-'60 · 7581, ~,'5 43 74.5 4 ,~ z,._ 0. 7o50. :d2 4 q 46 + 46 ~. c-,E., ~. , Of:: S 31';'.'.0 ,. 11. E. + 76. S .. ,3264 · J. i E.' .";8 S .'_f:z. OS.,:fO E:' ,5";' .... 335 i, ,', 1 E 3.~7., o b6 i:: 2., t. :,I'ANCI. b J. ,' ..u, f ] ON !'E [.', L. 4 '.:, 71< .,. 6Y S ,'..1 L.; L · ,164',,J.E: ::': 4J ~ L 4."']8.~: '3 'l{ ,: I' 4 75,",,,.I/' ~- 40 ~' ' I' ,1 t; 67, c, ;:.'. E'.4 '.'49 L'. 0,7, (;.~ ;'t C', c, 9 t060~;iJ iN'f EF,.k':IL,] f L.I) SLJI-::VI.:.Y STA] 1 ON 60 + 40~ iO0. lO0+ t00, lO0. 100, ,.., 8I ~., 3tl2J tJO L ?0,39, ,IE; "" ;"8 c.,;:.: 4 .."':,Cf + · ~J 0, + ' . 91II ~"z ~'c,;-~ -" ., . ...,.., . -/...:0 ,t588 li S 38~,EI.97 k 916:3.3't 60]". 9L, ,16-10."6 S 3915+]0 k s"'C, 2" .' /rI "' ,, ..... ~.,.1,,. <, 4 0 :: - 6 ,,",, 01, o -I S 4 0 ',-; F oO;'J .24 ::.. 40 9 F E A cB U R E !r, L; R I F ]' l'l f,' I F T _ ,.,~.~bL.. !J l F<E C.'. ]' ± bN r~EF:'TH "'" '" FEET b i'~ f't i' f-;b[. C 0 U f,:° E..., VEF:I I',_ AL. Vk'h:T ] CAL. LI:.NG 1 i.t !JE'.P T 1-! SE C.i' J CJi'! J': E.L T i" t;:'E: T' F LF.] 11700. 44 iS S 43 E r:, E.. c t' 0 0 ;,: J. O0 o 92.54, ",:7 c. 084 + 7L, 469""' o 11 A N ,'q D J N f F.['T L 7':;-' "' PI D Ij',~]'Ei,:I--'OL ,", f'E.l) SUF<V£.Y STAT] l J. ":'9,. ,_'~., 44 J 5 c:_, 43 E. 9:"' ,, 9320 · 87 I J. SO0-, 4.4 l.~...., S 43 i' ,..,°, ,',""'),'~ ...:,,. ,..,., 60 1834 AND ~ ] c" ', " i~ t ][ ~ --, ,. , ., ]'NTE. RF'OL AYE"l'i .... SIIt-,.:VEY ,.,'::: [ ¢, l" ]. ui',[S COl ~-.'t J]"F, T ] Llj'! uL'~°, J. 3;',.., j. ,.' 1, -- ][I :. r'. -/'? U L A F S '3 -'61 ,,/9 LL ~, L L.t c. Ij I', ~:J '..3 1 ~':f,tL, f i* J h'i' L'-f ] ,". k. r 0 e: J .,',, r',...., ,"',"-,,. '-', .i,,,, :1 I I 62C, 5, ] 0 ::, 40 j,:' I.: ¢,-'10.o8 S 40 !:' ,- 0 . ' L92%HD INTEF. F'CIL.~-.~f'LB SURMI:_"¥' SFAY . ,.,. , 11.925~ -44 15 S 43 [. 9J., 9~io,14 6j. 7e, ,, 67 4760.4V S .... oS',,,, ~, 4'::.:0o. 93 S f IHAL L'.L.OSUI,,!' - L~ I F,'t:. C; 1 ]: 0 N ~ ...... cB 40 L;ISTANCE~ 6297~80 r' ~:'LT ARCO Oil and Gas{ mpany North Alaskd .J~stnct Post Ofhce Box 360 Anchorage Alaska 99510 Telephone 907 277 5637 December 12, 1979 Mr. Hoyle Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Ak 99501 Subject: DS 3-13, Permit No. 79-71 Dear Si r: Enclosed please find a Monthly Report of Drilling Operations for the above-mentioned wel 1 s. Very truly yours, P. A. VanDusen District Drilling Engineer PAV:mb Enclosures ARCO Omi and Gas Company )s a Dlvls,on of AtlanhcRlchfleldCor,*ps,~¥ Form No 10404 REV 3-1-7.0 SUBMIT IN DUPLICATE STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 5. AP! NUMERICAL CODE 50-029-20399 6 LEASE DESIGNATION AND SERIAL NO ADL 28328 2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME Atlantic Richfield Company Prudhoe Bay Unit 3 ADDRESS OF OPERATOR 9 WELL NO P.O. Box 360, Anchorage, Alaska 99510 DS 3-13 (33-14-10-15) 4. LOCATION OF WELL 847'N & 912'E of SW cr Sec ll, TION, R15E, UM 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field-Prudhoe Oil Pool 11 SEC T. R M (BOTTOM HOLE OBJECTIVE) Sec 14, TION, R15E, UM ,2 PERy6u~_~1 13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE AND ANY OTHER SIGNIFICANT CHANGES 1N HOLE CONDITIONS. Report of Operations for November, 1979. Spudded Well @ 1800 Hrs 11/5/79. Drld 17-1/2" hole to 2750'. Ran 13-3/8" 72# L80 csg w/shoe set @ 2729'. Cmtd w/6400 sx Permafrost cmt. Did 20 sx top job. Installed & tstd pkoff to 2000 psi. NU BOPE & tstd to 5000 psi. Tstd Hydril to 3000 psi. Drld. cmt, FC, shoe +10' new hole. Tstd form to 12.5 ppg equivalent MW. Drld 12-1/4" hole to 11925'. Ran DIL/ SP/BHCS/CAL/GR & FDC/CNL/CAL/GR logs. Ran 9-5/8" 47# L-80 & S-95 csg. w/ shoe set @ 11877'. Cmtd w/1500 sx Class G cmt. Downsqueezed 285 bbls Arctic Pack thru upper FO followed by 75 sx Permafrost cmt. Ran GR/CNL/CCL logs. Ran Gyro. Ran junk bskt & gage ring. Set isolation packer on wireline @ 11235'. As of 11/30/79, running 5-1/2" tbg. d SIGNEI~~_ ~.~~. ~1 TITLE Drlg.En§ineer , DATE /~'//~'/Tq NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate wi~h the oil and 9as conservation committ~ by the 1§th of the succeeding month,unless otherwise directed. l'orm No. 10-404 RI' V. 3-1-70 SUBMIr IN DUPLICATE STATE UF ALASKA OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING . _ND WORKOVER OPERATIONS OIL ~ GAS [-3 WELL ,, WELL OTiiER 2. NAME O1- OPERATOR Atlantic Richfield Company 3 ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Alaska 99510 4. LOCATION OF WELL 847'N & 912'E of SW cr Sec 11, TION, R15E, UM 5. APl Nt'MERICAL CODE 50-029-20399 6. LEASE DESIGNATION AND SERIAL NO ADL 28328 7. IF INDI.%N-ALOTTEE OR TRIBE NAME 8. UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. DS 3-13 (33-14-10-15) 10. FIFLD AND POOL, OR ~SlLDCAT Prudhoe Bay Fi el d-Prudhoe Oil Pool ! !. SEC. T. R. M (BOTTOM llOLE OBJECTIX, E) Sec 14, TION, R15E, UM 12. PERSONal 13. REPORT TOTAL DEPTH AT END OF biO,WI'it, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED, PERFORATIONS, TFSTS AND RESULTS FISIIlNG JOBS JUNK IN HOLE AND SIDF-TRACKED tlOLE AND ANY OTHER SIGNIFICANT CHANGES IN IIOLE CONDITIONS. Report of Operations for November, 1979. Spudded Well @ 1800 Hrs 11/5/79. Drld 17-1/2" hole to 2750'. Ran 13-3/8" ~2# L80 csg w/shoe set @ 2729' Cmtd w/6400 sx Permafrost cmt Did 20 sx top job. Installed & tstd ~koff to 2000 psi. NU BOPE & ts~d to 5000 psi. Tstd Hydril to 3000 psi. Drld. cmt, FC, shoe +10' new hole. Tstd form to 12.5 ppg equivalent MW. Drld 12-1/4" hole to 11925'. Ran DIL/ SP/BHCS/CAL/GR & FDC/CNL/CAL/GR logs. Ran 9-5/8" 47# L-80 & S-95 csg. w/ shoe set @ 11877'. Cmtd w/1500 sx Class G cmt. Downsqueezed 285 bbls Arctic Pack thru upper FO followed by 75 sx Permafrost cmt. Ran GR/CNL/CCL logs. Ran Gyro. Ran junk bskt & gage ring. Set isolation packer on wireline @ 11235'. As of 11/30/79, running 5-1/2" tbg. 14. ! hereby .ge~ tha~theflor~omg~true a~d correct SiONE~_~.~~_..~ ~/~ffl. TITLE Drlg. Engineer DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the oil and gas conservation committee by tl~e 15th of the succeeding month,unless otherwise d~rected. Alaska Oil and Gas Conservation Ccsmission Hoyle R. Hamilton ~~L/ Cha~ of the Commiss Bobby D. Foster -~ ~ Petroleu~ Inspector November 13, 1979 witness nome Test on ARCO~$ D.S. 3-13 Sec. 14, T10N, R15E, UM Permit %79-71 Friday, Novembe. r 9, .1979 I traveled to prUdh°e Bay this date after being cont&oted by Mr. Joe McTnnes, ARCO Drilling Foreman, to witness the upcoming noPE test on ARCO's D.S. 3-13. saturday, sovember lO, 1979 The-BOPs test began at 2~30 pu and was concluded at 6~00 pm. this test are attached to this report. The results of In summary I witnessed the BOPE test on ~/~CO*s D.S. 3-13. Alaska Oil and Gas Conservation Ccmmission Field Inspection of Bl~ut Prevention Equipment Location: Sec / ~ T/~R/~.~ ~3/~7 Drilling Contractor ~.~;9/b/ _Rig Location, General ~ Well Sign ~ General Housekeeping ~ Reserve pit p~' ~ BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Test Pres sure Date., Representative ~~_, YSq <~--~z.~ ~ Permit # 7 .~- ?/ /35 Casing Set @ ~ _~ ? ft. ACCUMULATOR SYSTEM Full Charge Pressur~(3 o 0 ... psig Pressure After Closure/~ D psig 200 psig Above Precharge Attained: ~ ming~-~__sec. Full Charge Pressure Attained: . ~ mina,-sec N2o~.~Ob/_~.~ ! .~.?~/0, ~ ~o psig Controls: Master Remote~Blinds switch cover Kelly and Flcor Safety Valves Upper Kelly / Test Pressure ~~ .... Lower Kelly , / Test Pressure ~-~o Bal 1 Type / .~ Test Pressure Inside BOP / Test Pressnzre Choke Manifold ~; ~ ~ Test Pressure. No. Valves / l No. / - / Hydrauically operated choke / Test Tithe..~ ~zhrs." Test Results: Failures .. O Repair or Replacement of failed equipmen~ to be made within d~s ~d Inspector/Ccmmission office notified. Remarks: Distribution orig. - AO&GCC cc - Field Operator/Supervisor ~. Z ~'~ cc - Drilling Dept. Superintendent . October 1, 1979 Prudhoe Bay Unit DS 3-13 Atlantic Richfield Company Per. it No. 7g-71 Sur. Loc.~ 847tN & 912mR of ~ cr Sec 11, T10N, RISE, UN. ~22~1e ~.~ 1~20~N & 1320~w of SE cr Sec 14, T10N, . ~5E, Ua. Mr. P. A. VanDusen District Drilling Eng£neer ~ O,I and eeo Compan:y p. o. Box 360 Anchorage, Alaska 99SI0 Dear Hr. VanDusen: Enclosed is the approved application for permit to drill the above referenced well. Well samples, core chips and a mud log are not required. A directional survey is required. If available, a tape contain- ins the digitized log information on all logs shall be submitted for copying except experi~ental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as t~portant for the spawning or ~migration of anadrcsaous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title Alaska Ad~inistrative Code). Prior to co~mencing operations you..may be contacted by the Habitat Coordinator's of£ice, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the 'Federal Water Pollution Control Act, as amended. Prior to Mr. P. As V&nDuuen Prudhoe B&y Unit DS 3-13 -2- Octobe~ !, 1979 ccmnoing operations you may bo contacted by a representative of the ~epextment of Bnvi~onmenta! Conservation. ~Lrnant to AS 38.40, Lo~&l Hire Onder State Leases, the Alaska mepartmnt of Labor ts being not££ied of the issuance of this peruit to drill. ..,To aM us in scheduling field work, we wouldapl~rociate your ~0ttf~ing this offiee within 48 hours aftex th~ Well is spudded, We would ales like to ho notified so that a rep~e- sentat, tve o£ the eoumiselon may be present to witness testing of blowout preventer equipaent before surface casing ohos is dril led. In the event of suspension or abandonment, please give this witness l~eseat. HoYle H. Hamilton Cha~~ of BY ORDER OF THE Alaska Oil & Gao ~na~tion ~tssion m~be ARCO Oil and Gas~K 'npany North Alaska__ ~strtct Post Ofhce Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 September 25, 1979 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS 3-13 Dear Mr. Hami 1 ton: Enclosed herewith is our Application for Permit to Drill, the $100.00 filing fee, and the required survey plat. Very truly yours, P.A. VanDusen District Drilling Engineer PAV: mb Enclosure ARCO OII and Gas Company is a Dmvls~on of AtlanhcRmchfleldCompany Form 10-401 REV. 1-1-71 SUBMIT IN TRI( fE (Other mstruc~lOt, on reverse s~de) STATE OF: ALASKA R 7 [IV E D OIL AND GAS CONSERVATION COMMITTEE ;,~ c, 0 P, tQ7G PERMIT TO DRILL OR DEEPEN T~E OF WORK Alaska ~, , ~,, ~ DRILL [X'] DEEPEN ['-] l.,,,:,)~,~.,j~ TYPE OF WELL OIL [] GAS ~ SINGLE ~ MULTIPLE NAME OF OPERATOR Atlantic Richfield Company 3 ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4 LOCATION OF WELL At surface 847'N & 912'E of SW cr Sec ll, TION, R15E, UM ~~°~z°~e320'W of SE cr Sec 14, TION, RIBE, UM API #50-029-20399 5 6. LEASE DESIGNATION AND SERIAL NO. ADL 28328 '~P Ht~dINDIAN, ALLOTTEE OR TRIBE NAME 8 UNIT FARM OR LEASE NAME Prudhoe Bay Unit 9 WELL NO DS 3-13 (xx-14-10-15) I0 .~IELD,4~ID POO~, OR w~d ?ru~noe ~ay Prudhoe 0il roo~ l I. SEC , T, R., M , (BOTTOM HOLE OBJECTIVE) Sec 14, TION, R15E, UM 13. DISTANCE IN MILES AND DIRF_CTION FROM NEARES, T TOWN OR POST OFFICE* 12 5 Miles NE of Deadhorse, Alaska 14. BOND INFORMATION ~ T~EStatewidesuretyand/orNo. Federal Insurance Co. #8011-38-40 15. DISTANCE FROM PROPOSED * LOCATION TO NEAREST PROPERTY OR LEASE LINE, FT. (Also to nearest dng, umt, ff any) 1320' DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT 2640' 16 No OF ACRES IN LEASE 2560 19. PROPOSED DEPTH 11,805' MD 21 ELEVATIONS (Show whether DF, RT, CR, etc.) Pad Level - 30' RKB - 64' mou.t $100,000 17 NO.ACRES ASSIGNED TO THIS WELL 160 20 ROTARY OR CABLE TOOLS Rotary 22 APPROX DATE WORK WILL START Sept. 1979 23 PROPOSED CASING AND CEMENTING PROGRAM SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quantity of cement 32" 20" 94 lb. H-40 80' 250 sx Permafrost II to surf 17-1/2" 13-3/8" 72 lb. MN-80 2700' Circ to surf {approx 5500 sx) 12-1/4" 9-5/8" 47 lb. 80&95 11.805' (approx. . . 1500 gx) DIus 300'+ colun on ?nd ,,,, · ! ! · Atlantic Richfield Company proposes to directionally drill this well to ll,805'MD, 9402'TVD to produce the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack will be used. It will be pressure tested each week and operationally tested each trip. A string of 5-1/2" 17# N-80 tubing, packer, and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing liquid will be left in all uncemented annuli within the permafrost interval. Selected inter- vals within the Sadlerochit interval will be perforated, and reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wire- line work. Well will be flowed to production facilities during perforating and testing. The downhole safety valve will be installed and tested upon conclusion of job. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal ts to deepen g~ve data on p~esent productive zone and p~oposed new p~oductwe zone. If p~oposal ~s to drill or deepen chrect~onally, g~ve pertinent data on subsurface locattons and measured and true vertical depths. Gtve blowout preventer pro.am. 24. I hereby czrtify that ;~oregoT~ Tru_e [nd Correct ,4. ~TLE Dist. Drlg. Engr. (Th~ space for State office use) SAMPLES AND CORE CHIPS REQUIRED [] ~s '~o DIRECTIONAL SURVEY REQUIRED CONDITIONS OF APPROVAL, IF ANY MUD LOG ~N [] YES 0 OTHER REQUIREMENTS A.P.I. NUMERICAL CODE PERMIT NO. i- 7/ APPROVAL DATE APPOVED BY Chairnm~ TITLE *See Instruction On Rev~==oiu= OcLote~- 1, 1979 10/1/79 DATE ..'--- 615' '" WELL No ! ' ., LAT 70°14'00393'' Y 5 937961 93 ' ~ 1~ ~0 ,LONG 148°16' 22~6" X 71~93l 25 1~ 688- o. ~ LAT 70013' 59238" Y 5 937 845 28 ~~ 713 ~/ , n ~~738 ~~'~ ,~ LAT 70°~3' 58085" Y 5 937 72876 o~ ' ~ ~ LAT 70°t~' 56953" Y 5 9~7612 40 ~~787 ~~- '-~ ~ LONG. 148°16' ~9880" X 71401642 ~1 ~ ~ . 7 WELL No 6 LAT. 70©13' 55~4"56. Y 5 937 495.34 ;. x ~ _ ~ WELL No 7 ~ 862'~--~F c'(~ ~ Ii DIST TO LAT 70°l~' 54620" Y 5937 ~78.76 -- LONG 148°16' 18428" X 714 07~.07 WELL No II ,, ~ . o ,, LAT 70°13',52.~16 Y 5 9~7 14607 -~ - ~ ~ ~ '. I~ 912 LONG 148016' 17701 X 714 101.~7 LONG 148°16 16 976" X 714 129 G4 : ~ ~1~ WELL No 9 WELL No. 12 ,, ~' 936 LAT TO°l~ 0~.814" Y 5 938 307.51 LONG 148°16'16 Z49' X 714 15800 ~ ~ WELL NolO WELL No ,3 ,, LAT 70°13'50008,, Y 5 936 912 87 ~ I m LAT, 70014'02.662'' Y 5 938 191.14 LONG 148°16'15.521 X 714 186 38 ~ ~ LONG. 148°16'23.509'' X 713 875.09 ~. :.' ...... WELL No 14 , ...LONG 148°16 14799 X 714 214 55 NOTE T , ' , , o EXISTING WELLOR CONDUCTOR PIPE ~o ti__ ~,ERT!FICAT~ OF SURVEYOR ~2 ADDED WELLS 9~10 APRIL 19~9 GD I HERESY CERTIFY THAT I AN PROPERLY REGISTERED AND LICENSED ~.1 ADDED WELLS 5~6 JUNE 22,76 GD TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT REVISION DATE CKD TH~S PLAT REPRESENTS A LOCATION SURVEY NADE 8Y NE OR UNDER ARCO No HVL No 34-D8~-76 ~ SUP~S~ON~ AND ~ D~ENS~ONS ~ND APRIL ~5,m976 ATLANTIC RICHFIELD CO. DATE OF SURVEY SURVEYOR '"'"~:"' ~.' AS BUILT APRIL ~8,1979. ~."~.~~ j~',-' ~ '!. ~ DRILL SITE No. 3 " DATE OF ADDITIONAL ..... ,,, ~ WELLS No. I thru 14 SURVEY (Wells 9 ~ I0 ) ~,~ ~ .... ~ ' ~ LOCATED IN PROTRACTED ,; ,"' ' ' SECTION II TION., R 15E.,U.M y~ ~ ~ / . ~ , ~ · ,.,, DA'TE OF 4DDITIONAL PREPARED BY SURVEY (Wells l/thru/4) ~ J,, '~ :~.~ '//~:J~ HEWITT ~ LOUNSBURY ~ ASSOC. ,~. ~,~. ,, ~ 723 W 6~ AVE ~ ANCHORAGE ~, ALASKA ~.~,<,~,$;,~N~~ DATE MAY 5~ 1976 SCALE = 500' ~%~~ CHKD. BY GDD FIELD BK L~SELEAF ~ ,,, ~ .......... Is a registered survey pl~t attached ................................ Is ~11 'l~a~ ~~S~.dss~e ~ ~~ l~'. ~ ............ '; ... Is ~ll ~t~ p~~~ ~ o~ ~l~ .... ; ................ Is ~11 ~ ~ dev~t~ ... ................................ Is ~ra~r ~ o~y aff~ ~ ................ , ................ . ~ ~~t ~ ap~~ ~foro ~~ay m~t .......................... }. ~s ~a~r ~ a ~M h force .................................. ' Is a coition ord~ n~~ 2. ~s administrative approval needed ................................... 3. Is conductor string provided ........................................ ~ ,, .4. 16. Is enough cement used to circulate on conductor and surface ......... ~ Will cement tie in surface and intermediate or production strings ... ~ Will CeT, ent cover all known productive horizons ..................... ~. __ (4) sg. 17. Will surface casing protect fresh ~ter zones ....................... ~ 18. Will all casing give adequate safety in collapse, tension and burst.. ~%~ Does BOPE have sufficient pressure rating - Test to ~o~ psig .. ,, ~ ' 9dit ional R~uir~ments: 19. r~v: 06/71/7 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. LIBRARY TAPE CURVE SPECIFICATIONS Company Arco Oil & Gas Co. Well DS 3-13 Field Prudhoe Bay County, State North Slope, Alaska Date 3-14-80 Curve Name (Abbreviated) Standard Curve Name Logs Used Scale ....................... lo0- 200 GR Gamma Ray CN 0-100 L,.SN Long,, .Spa,ce ............ CN ......... 0- 2000 SSN Short Space CN 0-2000 , NEU.. c.9.mpen, s at ed Ne.utron CN . 60-0 ........... ...... PASF 1 ARCO O%L AND $~S .... 355-15 PRUDHOE BAY .... NORTH SLOPE,ALASKa, DATA EVERY I S_A,vlF'I. ES ......... GR --- LS'~ SSN 8BO0,OO 69,25 9~5.4B llGB.O7 _ _ - _ . 8800,50 70,70 9{+7,92 1175-~+~ ...... 8801.o0" ~-72-,~6-9~+6-70 1172.99 ssO~.so ..... 7~.75 9~o.59 z~S~.lS ~eeo2.oo ¥4'.-~-i' -- ~2e. ss z15~.56 qLAC 5525 o__ ............... - .................. ............................................... ......... -- ............. ....... - -- .................. 850-~,00 76,92 92 ~,~_7 _! 1 ~_},-.~- .... ....... -d-~-66,00 76,19 929.58 [l~8,~a ~,5l ....................................................................................... 5506,50 76.~& 935.70 11~9.6~ ~3S.69 ....... ~SOT,OO 76,92 9~5.70 11~D~67 ............ '~509,50 78,39 923,~7 ll~B,~2 ~,35 ............................................................ ............ ~bii';-Oo 7y.~B ~a.o~ ~s. Bs ~,~ .................. ............ s'~i~;-fib- .... V-~";~a 9~;''~Y'-i-[i~-;~7- ............ ~i-; ~'~'- _ ..... '~ .............................. ....... <~ ,, ~ ~ ~ *~, ..... <~ <? ~: ~:~i~ $~.:,'>'~-~:'~.{~~ ................................. ................... ........ 8B1~,50 76,19 923,~7 11~3,B5].... ~5,~7' .......... . ?..<:.. .......... <?.;:~:;.j:?~;.... ............. s~l'~";b6- .... -75;5s 9i5.~9~ zz~z.s9 ~.o5 ...... ~;...,.~,,. ~ ...... _ ...................................... .... 8aZ5.~"O' ........ 75-;2~ 905.50 1~1~.02 ~,~0 ,.. ........... S~i'7. O0 76.56-~ ~; 5 ~'" i'6'~'67 ~-~ ......... ~'?'~'~- _ ...... aBiB-; Ob ......... ?'V"T05 ....... '~Dg-2'6a--Y6'~-~-!l- ....... ~-i~-S~'L~ ..... . ................................................... 8821.50 50,95 859,90 852.17 5522,50 78,59 B50,12 829,00 ~S25o00 77,5~- 5~'~90 555.49 8825,50 77,78 ~59,90 9R~,85 - 8824,0~' 77,90 8'79,~6 995,62 8824,50 77.78 900.2~ 10~6.~5 ._ 32,06 3~,32 ~2,27 45,~0 45,9~ PAGE 2 ARCO OIL ANO SAS .... 055-15 PRUDHOE BAY .... NORTq SLOPE,ALA$4A HLAC 3ATA EVERY 1SA~LES 55~5 8826,00 81,56 8527,00 81.52 966.2G 1170,.55 ~1,50 8827,50 79.98 967.48 1174,21 41,06 8B28.00 8628.50 8829.00 8~29,50 8850,00 88S_.0 79,12 9G7. q.B 1158,07 40,70 __ 78,75 95{3.92 11G1,_~3 5 o_ .... 0 o 80.4 _5_ _0_ 00 79,7 o o 78. 8 B.3 5-_5_0. ....... 7__5...,_ 2._1 ..... 93~, ~7 8~6,00 7N,85 9~.1~ ............................................................................. s.%}_s~_~ ........ 74 · 7~ .__957._70 ss 77.9o 4~. 57 1839.00 75.34 962.59 ~$79.13 8839,50 75,~6 957,70 1175,4~ 41,68 ~B~O. O0 75.82 94~,25 ll5~.lO ~1,72 8840.50 76,51 938.1~ 1151.22 88~3.00 78.65 91G.l~ 1159.82 45.0~. 11~2.27 ~5.55 _ S~4,+. O0 80.46 9iS. i~ ii55.67 ~5.15 ...... 8~45.00 79.~9 915.G9 11~9.99 ~5.00 '-- ~s~5.'~d ..... 7-~;~--~ 9i~'.--g-~ 88~6.00 79.57 922.25 88~7.00 79.R4 911.1~ 8848.00 79.2~ 895.35 88~9,50 7~,37 9~1,R5 ~50._pO .... 79.12 9~50.50 78.75 906.3~ 1125.07 43.94 iio~.~6 ~5.~i ._ _ 1104.19 110S.65 ~5.58 110&.65 1115,~5 ' ~AGE 3 ARCO OZL AND S~S .... DS5-15 PEUDHOE 6AY .... NORTH SLOP[,ALASK~ 3ATA EVERY 1 SAMPLES ~L4C 5~5 LS~ $SN -~B§I,O0 78.39 906,36 11~5 07 45 SR - _._8851,50 !8~27 911,25 1122.62 44,76 _ _ ..... 8.852,_~ 0 ~7,90 91~.91 1181,~9 .... )~.~2~q_. 7!,~U__917.~6 1117,70 ___ 8853,~0_ 78~_39 929,58 llR1,)9 885{,00 78,75 925,}2 112G,)0 ~,09 ..................... · .( 8855,0~.__ 77,66 913,69 1129,99 8855,50 ~7,53 911,25 11~8,7~ ~5,29 8856,00 78,27 906,56..~.~_~5,07 .... ~5,66 8856~_50 78.88 s~9.0g_._%l.Ao.[6_. ~5.7~ __88,57.00 .7_9_~.0.P__.8. 8 ~ .i } __Aq y_S ._ U_ 5 ....... 8857,50 78,75 87.7_ ,_p. 2_ _[_0_~ ~, 7_~ .... _~_q_, _5_5 .................... 6558.00 76.27 8 7 8, ?.._q.._~._0__'4.__;5_,. 9 9 q. 5_, O0 8858_~_5_0__~ 78.02 88.0__,_~8__.[__0_~_8__.___0._2.. ......... ~ 1_. _~5_ .......................................................... ........ .8859, oo _7__.7_,_~.p_ ._~7.S._ 2~.._!.p_o..s_,_~_7_ ....... 3~_ :S~ ............................................................................................. 8859,50 77,78 87.9.,.90 9~0,._!1 57,96 8 ~ 60 o 00 77 o 0_% _8...~ .~_._ 01 8860o50 76.3~ 8~4.79 ~._,.._o..K ........... ~__~.75_ ....................... ..... _8_S_6_[.:_0. 0 _._75_..~ 8~1,50 7,,~8 88~_ ....~.5._.~_~__s....,..._~_2 ....... _~.:..~..S ........................... 88 ~ 2,50 7 ~ ,,~ ~' 901. ~ 7 9 ~ ?, ~ ~ ......... -~ ~-. S' 0 .......... ? '-' ':~..; ...... ;:~ii'i;i"- :~i,~!'.i;' ............................................. '~"S~3-;'-86 '~-~;~o---bi'~,"~9 ii~i-6~!i~. ~e~ ~ '~ ~; ~"' ..... :.ii~:~'?.7 ,' ..... ~:iiT"?',~i.~i?? ............................... -'~'~-~ ~;5~ ~; ~ 7---- ~ ~ .-5-~'.::,~:i ~"0-~ ;"~ ~ .... ~ ~. 5 ~ .; ......... ~i~i':~ ' ~7-~--%',!7%:~;; !?~.-;~i?~? .......................... __ .......... ~-~-~--~: s o- ...... v~";- 5~.,. ':~;~ 2 ~. o ~ ~:?!.~ ~ i~.; ~ o ...... :i.' ~ ~. z ~ -'"- .?~' ,, ~:~."~?;:i!!!:?-'i.i~.~i~: <~i?~,~i~;:.~-'2ii._/i'__L ......... i ......... 8865,00 7~o50.. 918 58 ~°50 ..~o5~ ............ ~.<.:;::~. ..... .. ....... ~-8"~§-;'~6 ....... ~-~:-.o ~ '~"i§'21. o 3 z.~ ~ ~ ~. o ~ .............. -~%.,. '"' ~."',~'~"~" i~:~,~,,~:~>~,?~?~?~ .............................. ..... 8~6~';~-~' ....... ~;19 932,03 ~2~,99 ~.00 ....... 8867,00 75,82 938,1~ ~157,~6 ~2,78 %-~"6-Y,- 5 O- .... 7'~';"e-~_ ..... §'3~-; 92 '--'[~-~'i ;"b-~- ........ ~ ~; 1 ~ ...................................................................................................... 8868o00 76o~ 92781~ ~'15~, 82 ~o02 ...................... 886 ~- j~-6---?¥-;-29 ..... § 2 ~-; 25-'~'['~"~'-;'-5 ~ .............. ~-'~-; '5 ~ ....................................................................................... 8869,00 78,27 ~ ~4"9~'-5"b- .... ?-~'~-~ 9 ...... ~-~ 7 ' 5 ~---i-i'~-2-? ~ -- ~ ~-; s ~- ................................................................................................. s8Yb-';'~-b .... ~-,~' .... ~-i~i.~-"[~b-~-;-~-9- ....... ~2'. ~ ................................................................................... 887[,00 7~,2~ 90~,56 [OS~,W5 ~5;-~- ............................................................................................. ...... -8'8-7 f,~ 0' ....... 7-~';"3~ 90~; 3~- -i-5'~'~-, ~-~ .......... ~ 5,33 .......................................... ~ ~72, o 0 73. d2----~ b~. ~"~-[~'3 ~ ~ ~. ~- ........................ S ...................................................... 8872'-56--- 7~-;0~ 9~o.0'2"-~i"~.~ '- ~'~.53 ....... esT,;bO- ....... ~b';-~ ~'~-~;%~--ii'~'~';"5~ ........... ~-~; i7 ................................................................................ ........... 887-~, 50" 70,57 922.25 11~,75 ..... ~q., ~ ....... 6~'75-2-00 ..... -7-1-,'06' -91~'2 ~-l-- ii'3? 2 S~ .... ~-27~ - 8~.~_.t~.O ..... ~!~3 907,_58 !Z_2~,.8.5.. _~5~%5 _.. 857G.00 71.06 895.55 1115.25 ~5.~ .............. ~AGE q ARCO OIL AND S~S .... DS5-1~ PRUDHOE BAY .... NORTH SLOPE,ALASK~ .]ATA EVERY I SA~.:~L£S GR LS~ SSN 8876~§0 70,70 891,69 1102.96 8877,00 70,82 39~.1S 1095.82 88772~'0- 7i,79 897,80 1095,59 8878,00 72,89 897,80 110{.19 8878,50 73,87 903,71 1106.65 8579,00 8 e 7' 9 · 5 0 ..... 7_'+_ · _'+ 8 ..... 9_ 0 S ,.9__~. 8880,00 7{.36 900,2{ 10B5,22 {N,27 _8_8B._0: 5_ 0 .... 73,99_..899,0_2_10_S 9 :~5 ___ _~ B81 · 00 ...... _7 .s. 0 ~____.~ p._9_: 09_ _i_u_ 9_?:9_ 0 ...... _~ !..._ Z~ ........... ....... _~_~_ ~_l_,_~_o ...... Zg :_i.~ ...... _9__o_ ~: .... 8 es_e_,_o__o_ ........ _7_ 2_.. 0_~_ ..... ~!_K,...e~__.Kq .... ~_.pe_, 5_0_ .... _7_..~_: 79 __9._!.2_._~7 1 ....... ~_~8_~_,~.0_ ....... _7_t,.8.9_ _9_0_@.~t~ ~0_9;+,_~_6 ....... ~_5..,~_~ ........................... 8~85.00 72.65 ._~_gA. ......... ~_~.~_5 ,A0_ ......... _..7. ~,.28 ...... 899 8886.00 .ZA._._~ ~ .... _8_ _ 9_! :_ . ~ _ _% _1_ u__~p .9_~ .......... ~...} ._! g ................... '~ 888?,50 72,26 910: q~_~..O.. _79 ~,.~ 2. .... _~_.~,_ 52 8B88,50 71.31 9iG,~:~:,-~-~XOO.50 < <~3~"98 '~ , .... ~ ~ ~d".~'~ .......... ~ ~ ~ ~: ~::::::~: ~ ~;'~ ~'::i: ~ o ;'~e ?:.::::' ::;:~:::,::~ e' ,::-::: :' .,. - ................................... :ii:S:_ ........... ~:-~i";'-o: .......... ~'~ ;'9z':: 9 i z.~:S::~:~: i:: :, ~5:::::;':.;~::~:;::~'o..:,: :.S: ......... :: ' ':.: ' ' ............. '~' ........................................................... B892.00 73.75 921.03 e ~ ~ 2_.~ 50 ....... 7 e · 65 .... e i ~ ,_.~ ~ ..~.~_~_~.,..~.~ .............. ~.~..~ 8893,00 71.31 907,58 11~0.16 ~.B9 BBg~.o0 70.45 889.24 110~.19 45.77 889~, 50 71, ~3 8p.~_?..S_5_ ~ 0 S },..~.~ ............. ~.5 ~...~ .................................................................... 8895,00 73~75-'-879.46 1078.~9 ~5.87 8895 · 50 76.07 8Z ~..~.;Z~_ _~P :..~.., 9. 2 .............~._~ .,__~..~_ ............................................................................................................ 8896,50 77,90 88~,35 1065,56 gS.5B ........ 8-~ 9'~';'-0--0-- 7~,39 es~',-~i--iu f7. i~ .... -~"~:'-6-6 ........................................................................................................... . ~ SS~.I.:So ___ 7s.:f ...... S~6,_~S._107~.I~ .... ~.~S ..................... : .... _ ................................................................... ..... ~.P~A~. o_ ~ ......... 71 ~.P.~....~_g ,_.~ :___: ~_~ ~ ,..~$ .......... ~A.~..~.~ ....................... B898.50 77.41 897,80 1075.~B ...................... 8899,00 77,29 90U,2~ .......... -8~'9~'2 :-0 ........ TV. ~ ~'4 2-if--io':'{. dd ....... 4'~ 2"'~': ......................................................................................... ?B Basic Information Tape The Basic Information Tape (BIT) is a binary, partially multiplexed tape containing wp to 20 data curves. The data samples are represented as IBM, 32-bit floating point numbers. The tape consists of a 276 byte heading record followed by a series of data records whose length is defined in the heading record. The last data record is followed by two end-of-files, The tapes are 9 track, 800 bits per inch. Heading Record The heading record contains the information necessary to recover the curve data from the data records and some identification information. ' 1. The Epilog Computation Center (ECC) number is a unique number assigned at one of the Dresser Computer Centers. Any questions regarding the data should, if possible, include this number. 2. Company name - Well name. These are free format fields used to identify the well. 3. The number of curves (N) is designated as a 16 bit binary integer number. This number must be less than or equal to 20. It gives the number of curves of data that will be in the data records. 4. Curve names. Each curve is designated by a 4 character name. A list of Dresser Atlas standard names is given in the appendix. These names appear in the order in which the data appears in the data record. 5. The starting and ending depth gives the first depth for which there is data on the tape and the last depth respect- ively, l~nnen the starting depth is smaller than the ending depth the data is recorded downward, l~'ith field data, the ending depth may be smaller since the data is recorded from the bottom of the well upward. The ending depth may be given as 0 or 99999 when it is not known during record- ing; this occurs on BlT tapes recorded in the field. 6. Level Spacing (L). This field designates the depth increment between the data samples. The data samples are taken at regularly spaced depth increments. 7. Number of samples (F). This field gives the number of samples of each curve recorded in each data record. This number ~ill be less than or equal to !25. DATA RECORDS The sample.s in the data records are recorded as floating point members (IBM standard). This consists of a sign bit, ? bit exponent and a 24 bit mantissa normalized to the nearest 4 bits. mantissa A sign bit. The exponent is biased by 40~6. Thus, 41]00000~ represents the number 1.0. The data record consists of N . F . 4 bytes of data where N is the number of curves and F is the number of samples of each curve. The first F samples in the record will be of curve 1, the next F samples will be of curve 2, etc. Each record will contain data for F . L feet of data, where L is the level spacing. The current standard usage at Dresser data center is Level spacing = L = .5 feet Samples per record = F = 125 Thus each record represents 62.5 feet of data. These numbers are given as an example only, however, since L and F may vary from tape to tape, and will certainly be different for BlT tapes recorded in the field. DREE;EiER COMPUTER SERVICES DIVISION I)ATE 10 - 6 - 7 7 FILE DATA SPECIFICATIONS (Continued) EXHI Bll' 1 Page~ ] FILE NAME I FILE NAME 2 APPLI CATION FILE NUMBER . 4 5 6 8 i DENII FI CA'lION FI ELI) SUB FI ELD 1 2 -9 10 11 12 13 FIELD DESCRIPTION Epilog.CoBputation Number Company Name Well Name ............ N~mher of C~rves Filler Curve Names Tape starting depth Tape ending depth Data level spacing Depth column Filler (=0) Number of samples of each curve per record Filler POSI liON CI~AR- ACTER- I STI CS INT NO. NO. OF OF DECIHALS 8O 11 000000 11 00000O 1111 0o 1111 00 o0 11 00 00o0 11 00 0000 11 0o 00 00 11 00 00 o0 11 0000 11 0000 00 11 00 u0 11 O0 00 i11111 0000o0 111111 000000 7777777777 7777777777 77 77 77 77 77 77 77 77 17 77 77 71 000000 000000 00 00 00 00 00 0000 00 0000 0o 00 00 o0 00 00 000o 00 O00o O0 O0 O0 O0 O0 000000 000000 1771777777 7777717777 17 77 77 77 77 77 77 77 77 77 77 77 666o6o 000000 666666 000000 66 O0 O0 66 O0 O0 60 O0 0000 66 O0 0000 bObbbbbb O0 O0 O0 bbb6666b O0 O0 O0 60 66 0000 Ou 66 66 0000 O0 60 ~0 O0 O0 86 60 O0 O0 660oo6 000000 bbbbbb 000000 000000 000000 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 O0 0000 O0 0000 O0 O0 O0 O0 O0 000000 000000 44 44 44 44 44 44 44 44 44 44 44 44 44444444 44444444 44 44 44 44 44 44 44 44 222222 222222 22 22 22 22 22 22 22 22 22 22 22 22 2222222222 2222222222 *START* USER PCAL [10107,o0042] MONII'tJR 5aS ixl, lOk34 JOb-79. ,START* ,$'i'ARI* USt:,I~ PCAb [10707,000421 MONITt)R ~w~., I',LI0~34 J!JL-/9. ,START* dOB JOb U U DDDD id id U O D O H H d U D D H t.4 O U D D HHHI-IH U U O D H H U U D D H H UUUUU DDDD H H 1777 DAT~ 1777 DA~ O 0 EEEE 0 0 k 0 0 k 31-JAN-80 ~I-JAN-80 12:21:18 12:21;18 1111 111I 11 Ii 11 1I 1i Ii ii II £I Ii 1111 PPPPPPPP PPPPFPPP PP PP PP PP PP PP PP PP PPPPPPPP PPPPPPPP PP PP PP PP PP PP TTTTTI ~I 1~. TTTT rTI'T 1 T rT O~ UU 'F F tJ tJ U (J 'I T [JO OU T T [J (] O U fT utJ OO 1'iF tjt'J ~-T [Jb DO T T U b O U T ~ U[J UU T T tJ u (j ti TT UUO[JtJIJ TT (jUUOU(i *STAH'F* U3t~ PCAb [10707,O0042J dOB SH1P SEQ. 1777 MONITOR Swb ~blOh]4 JILL-79. *START* :SHIP TU¢255>[IO707 60042] CHEATED: 31-JAN-80 OUhUL SWIICHhS: /~Ibg:~UHT /COPIES:I DATh tl-UAN-80 12:21:18 11:24:00 SHIP TO : 6HIE'PI~G INgTHUCTItJN8 IGSOED ]I-JAN-~O 11:23 PCCC VENTURA, CS4LI~ I)~ IA PCCC VV VV ~E ~h RH VV vv LL ~H HH VV VV ~L P~ H~ VV VV ~LLL~L~L H~RHHRRH VV VV E,~LLLLLE ~RRRRRRB VV vV FL H~ H~ VV Vv ~E PH ~H VV VV ~K hH ~H VV VV ~E ~H ~H VV ~LLLLLLLLL Hh RH VV h~LLLLLLhL R~ ~ 1illii IIIiii lI II i1 Ii II ii I1 II II 1I I11111 IIIIII YY YY YY ~Y YY 000000 OOOO00 44 44 000000 000000 44 44 O0 Ob O0 O0 44 44 O0 O0 O0 O0 44 44 00 O00O oo 0000 44 44 O0 O00O O(J 0000 44 44 O0 O0 o0 O0 O0 O0 444444444~ O0 O0 O0 O0 O0 O0 4444444444 0000 Oo 0000 O0 44 0000 OO 0000 O0 44 O0 O0 O0 O0 44 O0 Oo oO O0 44 O000oO O00OO0 44 00000o OOOOO0 44 ,I, 5£ART* USER PCAL [10707,60042J dob SHIP MLINITiJR SwS KLIOLJ4 JUL' 79. ,SIAR~* f'ILL: DS~:VLHI~Y.O0~<05~>[10107 60042] CRLAt~D: FHINTLD: 31--dAN 80 1~:2{:41 ~UEU~, S~llCnE~: /~lbk:fURT /COPiLS:i /bPACII4GII /LlNIF:133 /FOR~S:NURNAL 1777 DATE 3I-JAH-BO 31-JAN-B0 12:20:03 12:21:1B SCHbUMSERGER COMPUTING CkNTE~ 10707,60042 DATE: 80/ 1/31 TAPE ~$?.R V 1 C(~MMk. 'I.'A CSG= FI,=5 1 32 bITES t,~ANk: 60042 DATE: 80/ 1/31 NAME: k, Pl 1' CtJ~,~T1NUAI IUN NU~k,A: O1 ~AP~ NAMe: 375~272g/BIS~=l 2.25/F LU ID=LIGNOSUL[ O./DENS=lO. 4/V [6C=43/~H:11.5 2/NM= 1.78~b5/RMP =1.39~b3/BHl'= 188 I,KNG lti: 02 B i' 'F Ik,b [ ILk NA~It~: k13iI .001 HAX[NUN Ptti,.'.blCAb ~ECURD LENGTH: PP, gVI(JU,b [:I[,E NAMF.: 1024 *C. l bO CU. bDfiOE BA~ AUAS~A D~ 1A ~ LLNG'I H '- 6 1 0 ~PLC 1~ 1CA [ S~TkS I~tPL 0 ~IZL 1 MLP CODL 0 8PkC li~ ICAT1UN lC [ tJUh BLtJC ~5: ,.'SV URD ~ UN1TS AP1 AP1 AP1 AP1 PT 0 0 0 0 MV 7 1 0 0 UHMM ? 12 46 0 DHMM 7 12 44 0 UHMM ? 22 8 0 GAP1 7 ~1 32 0 U$/F 7 52 32 0 GAP1 ~2 31 32 0 IN 42 28 1 0 G/C~ ~2 44 0 0 PU 42 O8 3 0 G/C3 42 55 1 0 C/C 42 42 I 0 CPS 42 34 92 0 CPS 42 34 93 0 FIL~ 5IZg EXP PROC SA~ HEP DgPT SHIPT 4 0 0 1 68 0 4 0 0 I 6~ 0 4 0 0 1 68 0 q 0 0 1 o8 0 4 0 0 1 68 0 4 0 0 1 68 0 4 0 0 1 68 0 4 0 0 1 68 0 4 0 0 1 08 0 4 0 0 1 b8 ~ 0 4 0 0 1 68 0 4 0 0 i o8 0 4 0 0 1 68 0 4 0 0 1 68 0 4 0 0 1 68 0 11 llquO.oO0 11800.000 t I 7L, U. 000 llbO0.O00 MNEMI)NIC SP GH IOI~I-IU NCNb VALUE -1019.250 -99Y.250 -999.250 -999.250 MNkt'IUN IC VALUE ILD -999 DT -999 NPHI -99925 ~CNL -999 ~P -b0.750 iLD 6 DBItU 0.044 NPH1 40 NCNB 2958.000 ~CNL 891 bP -22.795 ILD 6 GR /8.438 DT 78 DMHU 0.029 mPdl 31 NCNb 1799.000 BCNL 032 SP -12.770 ILD 8 Gb 89.500 DT 73 UBHU -0.00] NPHI 27 NCNb 2300.000 ~CNL 82o SP -43.953 ILO 5 GB 07.875 DT 72 DRMU 0.181 NPHi 25 NCNB 2298.U00 fCNL 905 6P -~5.594 1LD 2 GR /0.0oo DT 92 DRM(~ O.OOb NPHI 32 NCNb 2410.000 ~CNL 789 11400.000 bP -58.9]8 ILl) 5 G~ 74.063 DT 90 · UMHU 0.039 NPMI 27 I~CNL 223~.000 ~CNL 831 SP -4q.125 ILD 28 GM 81.563 DT 91 URH(J 0.081 NPHi 30 NCNb 2298.000 ~CNb 784 SP -o7.b88 iLD t8 GM 78.250 DT 97 DMHO 0.064 NPHi 28 I~CNL 2244.000 fCNL 847 SP -21.223 ILD 31 GR 144.250 DT 70 D~HU -0.001 NPBI 19 mCNL 2b~4.000 BCNL 1245 l l ~00.00u 112Ou.o00 lllO0.UO0 110¢0.000 .250 .250 .000 .250 .699 .188 .137 .500 .~13 .000 .543 .000 .969 .000 .539 .500 .793 .750 .14~ .000 .068 .563 .617 .500 .285 .750 .148 .500 .555 .188 .g28 .000 .109 .000 .127 .500 .400 .000 .613 .000 .641 .563 .971 .000 MNLMUN1C GR RHiIB ILM ibm ILM IbM GR ibm RH(]I~ GR ~H05 ILM RHOB IbM UR ~HOB ibm GR RHUB IbM GR VALUk -999.250 -999.250 -999.250 8.516 89.025 1.768 5.844 84.313 2.582 8.945 01.344 2.533 5.449 57.656 2.54~ 2.160 28.078 2.277 5.273 31.172 2.314 10.438 40.594 2.320 lb.531 32.531 2.396 21.984 30.009 2.303 23.150 129.000 2.009 MNkMONIC LLSU CALi NRAT LLSU CALl NRAI Lb8O CALl NRA1 LLSO CALl NRAI bbSU CALI NRAT LLSU CALl NRA£ bbSO CALl NRAI 668U CALl NRAT LLSU CALI NRAT LL8U CALl NRAT bbSO CALl NRAT VALUL -999.250 -999.250 -999.250 11.859 8.508 3.314 6.090 15.719 3.150 10.203 14.602 2.857 0.051 13.578 2.674 3.594 13.039 3.158 9.359 12.539 2.779 12.906 12.422 2.695 21.406 12.320 2.973 24.031 12.256 2.869 36.313 14.914 2.361 D t~,F' i t~ 0900. 000 1¢)81)0.00(~ 10700.()00 1060u, 10500. 000 10400.000 10300.000 10200.000 lOloO.OOO lO000.000 990u.000 MN LMuNIC NCNb LJRHO NCNIJ SP DFHO NCNb GR DRHU NCNb DRHO i~Cmb G~ NCNL SP GF DP, HO NCNL SP DI~HO N C N L DRHll NCNb GH L)HHO NCNL VALUE -21.031 206.375 0.005 2090.000 -~.367 34/.250 -0.012 1797.000 -18.00b 1U~.625 0.040 172q.000 -16.955 144.750 -0.001 2336.000 -18.799 115.938 0.010 2144.000 -29.258 184.500 0.00g 1842.000 -25.305 198.625 0.022 1931.000 -25.000 222.~25 0.029 1824.000 -d3.816 114.250 O.045 1927.000 -24.289 83.~88 0.129 1922.000 -21.b41 80.938 0.033 1850.000 MN LMONiC iLD DT NPMI FCNL ILD DT NPHI vCNL lhD DT NPHI ~CNb lCD DT NPHi ~CNL lCD DT NPHI FCNL iLD DT NPHI ~CNL DT NPHI ~CNL ILD DT NPHi ~CNL lCD DT NPHi ~CNL 1LD DT NPHi ~CNL ILD DT NPHi FCNL V VALUE 7.133 79.188 26.563 758.000 4.754 101.375 40.527 497.250 4.238 101.563 40.723 472.500 4.~05 8~. b3 34.619 704.500 3.830 93.563 ~b.708 b48.500 3.020 94.000 35.645 522.500 2.982 95.000 38.037 513.500 2.594 100.750 40.234 533.000 2.711 90.188 34.~75 617.500 2.398 87.563 32.715 624.000 2.240 89.188 35.742 557.500 P, HOB i bM GR I~HOB IbM RHUB GR RHOB ibm GR IbM GR IbM GR ~HO~ ILM GR ILM GR VALUk b.383 193.125 2.b6b 4. ]79 318.000 2.477 3.889 164.500 2.490 3.b45 122.000 2.527 3.586 110.250 2.490 2.832 173.025 2.580 2.7/9 lbg.b25 2.566 2.414 195.250 2.543 2.566 110.313 2.563 2.232 84.813 2.543 2.109 85.563 2.377 MNEMONIC LLSU CALl NRAT LLSU CALl NRAT bbSO CALl NRAI LL8U CALl NRAT LL8U CALI NRAT LL8U CALl NRAT bb8U CALl NRAT LLSU CALl NRAI LL8U CALl NRAI LL8U CALl NRAT bh8U CALl NRA£ VALUL 7.Tbb 15.328 2.813 0.695 14.711 3.621 5.813 15.844 3.662 b.020 15.141 3.303 5.242 14.234 3.398 4.461 15.969 3.383 4.250 15.477 3.502 3.879 15.320 3.b21 2.947 lb.828 3.336 2.475 15.555 3.229 2.469 15.180 3.367 9 ~ 00.0 o O 9700.000 9600,000 95O0,0O0 9400.000 9300,000 gdoO. 000 ql00.000 9000,000 8900.000 b 800 o 000 Ni~I kM(Jtxl i C SP GR L)RHLI NCNb SP N C N b NCNb DRHU NCNL D~Hu NC Nh D }< ti u NCNb DRHO NCN~ NCNE GR DFHu NCNb D~HU NCNb VALUL -32.727 0,030 2094,000 -?1.000 94,750 -0. 004 212,4.000 -2~1,46~J 81.375 0.028 2098. O00 -23,3o9 09,31~ 0.026 2102,000 -25,/t95 76.81~ O.03b 217~.000 -24,~18 3 10.500 -0,001 2039,000 -2o.711 89.31 :~ 0,02b 2154,000 -25.688 135. 150 0.011 17bb.O00 -ZU ,539 109.503 0.050 1907.000 -27.742 11.4,438 0,032 2110,000 -29.844 1~4.4J8 0.017 21 32.000 ~LMON lC iLL DT NPHI ~CNL DT ~ CNL ILL hPM1 fCNL iLD DT NPHi ILL DT NPHI ~CNL ILL DT NPHI ~CNb iLD DT NPHi ~CNL NPHI ~CNL DT NPHI FCNb DT NPMI FCN6 D~ NPtt i FCNL VALiJ . 85. 31. 701 · . 87, 32, 702, . 87. 31. 693. 561 750 543 000 723 188 080 500 533 750 250 500 2.641 8~.750 30.615 709.500 2 85 30 743 2 84 35 585 3 87 30 709 1 102 37 54O 2 94 34 016 2 91 32 039 3 91 32 669 .605 .750 .420 .000 .832 .563 .254 .000 .104 .188 .371 .500 .575 .750 .3O5 .000 .539 .~75 .375 .000 . 1 .000 .310 .188 .275 .000 MNbMI]hlC BIdOB GR MHOB GR RHOB GR RHOB ILM GR iLM GR RHOB ibm GR ILM bR RHOB GR I bN VALUE 2,400 79.313 2.46~ 2.619 90.25~ 2.46 2.396 74.000 2.510 2,479 83,813 2,518 2.477 78.125 2.488 2.516 64,625 2.463 2.895 85.625 2.518 1,498 123,125 2,414 2,299 106.125 2.518 2.564 89.938 2.531 2.971 81,813 2,498 MNLMONIC Lh80 CALl lq R A T h680 CAb1 NRAT 6680 CALl NRAT 6680 CALl NRAT 6L80 CALl NRA£ 6680 CALl NRAT 6680 CALl NRAT 6680 CALl NRAT bhSU CALl NRAT 668U CALl NRAT L680 CALl NRA% VALUE 2.850 15.352 3,146 2.973 15.109 3.174 2.805 15.47'7 3.131 2,893 15,438 3,084 2,902 15.281 3.0b8 3,1!4 15,344 3.346 3.492 15.203 3.063 2.240 lb.109 3,479 2.680 17.734 3.357 3,400 17.266 3.283 3.299 17,703 3,254 v [) k [-"t 1-t ~700.000 86U0,000 8400.000 8 .,,lO0. OO0 8200.000 8100.000 8000.000 7900.000 7800,000 77Uu. OO0 SF GR DRHU NCNL SP DHHU NCNb GR NCNb SP GH U~HU NC NL G~ DRHU NCNb SP DRHU NCNb GR DRHO NCNb GH DNHU NCNb Gk DRHLJ NCNb NCNb VAL -32 114 0 2096 -31 114 0 2096 -30 114 0 21)96 .69 .43 .04 .00 .96 .04 .00 .82 .43 .04 .00 -38.047 114.438 0.040 2090.000 -44. 114. O. 209b. -98. 114. O. 2096. -67. 114. O. 2090. -54. 114. 2090. -bb. 114. O. 2096. 114. 0. 2096. -120. 114. O. 209b. 003 438 040 000 063 438 040 000 125 438 040 000 625 438 040 000 9o9 438 040 000 250 438 040 000 938 438 040 000 NNEMONIC ILD DT NPH l PCNL ILD DT NPtt i I~CN6 IbD DT NPhi ~CNb 16D DT NPHi 160 DT NPHI FCNL 1LD NPHI ~CNL ILD DT NPHI FCN6 ILD DT NPHI fCNb IbP DT NPHI PCNL ILD DT NPHI ~CN6 lbu DT NPHI ~CNL VALUE ~.924 91.188 32.617 690.500 3.357 91.188 32.617 690.500 3.803 91.188 32.617 690.500 3,686 91.188 32.017 690.500 2.994 91.188 32.~17 b90. 00 1.758 91.188 32.617 090.500 91.1 32.b17 090.500 4.703 91.188 32.617 090.500 4.027 91.188 32.617 090.500 4.621 91.188 32.617 690.500 1.102 91.188 32.~17 bgo. 00 MNEMONIC lbM RHO~ ibM GR sNOB IbM GR ibm RHOB SHOB ibm GR RHOB IbM GR HHOB IbM GR RHOB GR ibm GR RHOB iLM GR VA6Uk 3.584 84.088 2,512 2.922 84.688 2.512 3.37~ 84.68 2.512 3.299 ~4.688 2.512 84.68 2.512 1.989 84.688 2.512 2.96'1 84.688 2.512 4.137 84.088 2.512 3.854 84.688 2.512 4.066 84.6d8 2.5i2 1.271 84.688 2.512 MNEMONIC 668U CALl NRAT bh8O CALl NRAT bLSU CALl NRAT LLSU CALl NRAT LbSU CALl NRAT LbSW CALl NRAT bb8U CALl NRAI' LhSU CALl NHAT 6LSU CALl NRAT LbSU CALl NRAT 6bSO CA6i NRAT VALUE 3.727 17.906 3.285 3.395 17.900 3.285 ~.793 1 .906 3.285 3.742 17.906 3.285 ~.~77 1 . 06 3.285 5.051 17.906 3.285 4.094 17.906 3.285 4.293 17.906 3.285 5.754 17.906 3.285 5.773 17.906 3.285 5.297 17.906 3.285 D~.P'I H ?buO o 000 740U. 000 7 ~O(,. 000 7200.000 7100.000 70OO.UO0 O9Ou.000 0800.000 6700.000 66oO.000 MNI:,M[JI~J lC NCNb SP DHHU NCNb DRHIJ NCNb bRHO NCNb GR DRHU NCNb Gh DH[tU NCNb ~P DRHU NCNb L)HItU NCNb gt~ NCNL SI-' D~HO NCI~b ~P GR DHH(J NCNb VAL 114 0 2090 -121 114 0 2096 114 0 2096 UE .438 .040 .000 .93U .438 .040 .000 .219 .438 .040 .000 -92.0o3 114.4~8 0.040 2090.000 -102. 1lq. O. 2096. -57. 114. 0. 2096. -105. 114. 0. 2090. -67. 114. O. 209~. -70. 114. O. 209~. -~7. 114. 0. 2096. -40. 114. O. 2090. 375 438 040 000 844 438 040 OOO 503 438 040 000 219 438 040 000 O25 438 0~0 000 909 438 040 000 547 438 040 000 MNEMUN lC DT NPHI ILL DT NPHi ~CNL DT NPMI OT NPHI DT NPHi PCNL ILD DT NPHI ~CNL DT NPHi ~CNb ILD DT NPHI ~CNL iLD DT NPHI FCNL 1LD DT NPHI ~CNb DT NPflI ~-CNL VALU 91. ]2. 090. 91. 32. b90. . 91. 32. 690. . 91. 32. 690. . 91. 32. 690. 4~ 91. 32. 690. . 91. 32. 690. 91. 32. 690. . 91. 32. 090. . 91. 32. 690. . 91. 32. 690. 428 188 5 0 338 188 617 50O 523 17 5O0 291 188 617 500 745 188 617 500 418 188 817 500 113 188 (',17 500 059 188 617 500 180 188 500 230 188 617 500 588 188 617 500 MNeMONiC ILM GR SHOB ibM GR IbM GR RHOB GR R M {] b GR RHO~ IbM GR RHUb IbM GR ILM GR RHOB ibM GR RHUD IL~ fir GR VALUE 3.693 84.688 2.512 1.580 84.088 2.512 3.793 84.688 2.512 2.568 84.688 2.512 1.938 84.088 2.512 4.410 84.088 2.512 2.480 84.688 2.512 3.867 84.~88 2.512 3.043 84.688 2.512 3.543 84.688 2.512 3.211 84.688 2.512 MNEMUNiC LLgU CALl NRA'f bbSU CALl NRAT bbSU CALl NRAT LL8U CALl NRAT bbSU CALl NRAT LLSU CALl NRA1 bbSU CALl NHAT bbSU CALl NRAT bb8U CALl NRAf bLSO CALl N RA'I bbSU CALl NRAT VALUE b.777 17.906 3.285 6.238 17.906 3.285 6.328 1'1.906 3.285 6.164 17.90~ 3.285 5.621 17.906 3.285 4.891 17.906 3.285 7.117 17.906 ].285 5.352 17.90~ 3.285 4.945 17.906 3.285 3.660 i7.906 3.285 3.225 17.906 3.285 DIz. P'I'H ~590.000 6400. 000 300. O00 6200.000 olOu. O00 6000. 000 5900.000 5800.000 5700°O00 5600. 000 5500.000 M N bP N C N L SP DI-'ttU NCNb NCNb SP GR DR ti |J NCNb GR N C N b 8P GR DRHU NCNb ,5I-' DNMU NCNL bP G~ NCNL, 8P GI~ DRHU 14CI,IL SP C., t-< DRHU N C N b GI~ NCNL VAL -101 114 0 209~ -69 114 0 2090 -87 114 0 2096 -U8 114 0 2096 -103 114 0 2090 -69 114 0 2096 114 0 2096 -83 114 0 2096 11 0 2096 -115 llq 0 2090 -57 114 0 2096 UE .375 .438 .040 .000 .313 .438 .040 .000 .313 .438 .040 .000 .063 .438 .040 .00U .438 .438 .040 .000 .406 .438 .040 .000 .250 .438 .040 .000 .938 .438 .040 .OO0 .438 .438 . O40 .OOO .689 .43~ .040 .000 .563 .438 .04o .000 ~N EMUNIC DT FCNL DT NPHi ILL DT ~CNL ILD DT NPHI PCNb ILO DT NPH1 ~CNL ILL VT NPHI ~CNb DT ~CNL DT NPHI fCNb DT NPHI fCNL iLL DT fCNL OT ~CNL VAbUE 2.092 91.188 32.017 690.500 2.781 91.188 32.617 690.500 2.412 91.188 32.617 090.500 2.189 91.188 32.617 690.500 2.213 91.188 32.617 090.500 3.229 91.188 J2.617 090.500 3.238 91.188 32.o17 090.500 3.~42 91.188 32.617 090.500 1.908 91.188 32.617 690.500 1.769 91.188 32.617 690.500 4.750 91.188 32.617 O90.500 MNEMONIC ~HO~ iLM IbM GR IbM GR GR ibm GR GR RH(JD GR GR VALUE 2.195 84.688 2.512 2.144 84.688 2.512 2.473 84.688 2.512 2.232 84.688 2.512 2.152 84.688 2.512 3.217 84.088 2.512 3.139 84.688 2.512 3.564 84.688 2.512 2.088 84.688 2.512 1.932 84.688 2.512 4.047 84.688 2.512 MNEMUNiC LLSU CALl NRAI bb8U CALl NRA~ bbSU CALl N RA'I LbSU CALl NRAT bbSU CALl NRAT LLSU CALl NRA'£ bbSU CALl NRAT bb8O CALl NRAT bbSO CALl NRA£ bbSU CALl NRAT LLSU CALl NRA VA6Uk q .5~'1 17.9o6 3.285 4.438 17.906 3.285 4.574 17.906 3.285 4.855 17.906 3.285 4.891 17.906 3.285 4.672 17.906 3.285 4.898 11.906 3.285 6.727 17.906 3.285 5.188 17.90~ 3.285 4.891 17.906 3.285 5.131 17.906 3.2U5 DLP'IH .5 44.~u. 000 5 JO0. 5200. OUU 51 oO. 000 50uO. boq 4900. 000 O, SvO.OO0 47~0.000 ~600.000 4500.000 4qoo.o00 NNLHUN lC DHHtJ i'~ C N b SP G~ DPHU NCNb GR DRHo l,~ C N b ~P DHHU GR OHliO NCNL ~P DF:HO N C N b Gl{ DRHO NCNb GR DRHU N C N b ~P NCNb Gl.,, NCNb VA -4 11 209 -11 11 209 ~.578 4.438 0.040 t~ .000 3.56J 4.4J8 0.040 6.000 -55.375 114.438 0.040 2096.0O0 -75 11~ 0 209~ -59 114 0 2096 -65 114 0 209~ -9~ 114 0 2096 .Obi .438 .040 .000 .313 .43~ .040 .000 .9~9 .O4O .000 .375 .438 .040 .000 -01.781 1~4.438 0.040 2096.000 -t 11 209 -8 11 209 -7 11 209 1.438 4.438 0.040 ~.000 7.063 4.43U 0.040 t~ .000 8.656 4.438 0. 040 6.000 bin ~MUN1C lbo DT NPM1 FCNL ILD OT hPHI ~CNL lbo DT NPNI ~CNL ihD DT NPHI 160 DT NPHI ~CNL 1LD DT NPHI ~CN6 DT FCNb 1Lb DT PCNb DT NPHI ~CN6 ILO DT NPMi ~CNL ILD DT NPHI FCNL VALUE 4.402 91.188 32.617 690.500 1.672 91.188 32.617 690.500 5.074 91.188 32.6i7 690.500 5.082 91.188 ]2.617 690.500 5.359 91.188 32.617 090.500 0.547 91.188 32.617 690.500 4.]87 91.188 32.617 690.500 b.309 91.188 32.617 090.500 0.625 91.188 32.017 690.500 6.]01 91,188 32,617 090,500 7.109 91.188 32.617 090.500 MN~MUh lC ILN GR HOt~ ILM GR GR IbM GR bR RH(]B 1LM IbM GR GR RHOB GR RHOB IbM VALUL 3.559 84.088 2.512 1.617 84.088 2.512 4.250 84.688 2.512 4.758 84,688 2.512 3.702 84.688 2.512 5.056 84.688 2.512 4.578 84.088 2.512 5.355 84.688 2.512 5.021 84.088 2.512 6,117 84.688 2.512 5.900 84.e88 2.512 NNENUN lC CALl NRA'f bhSU CALl NRAT bbSO CALl NRAT bbSO CALl NRAT 6680 CAbi NRAT bb8U CAbI NRAT bbSO CALl NRAT b68U CAb1 NRAT bbSO CALl NRAT 668U CALl NRAT bbSU CALl NRAT /O VALUE 4.270 17.906 3.285 3.705 17.906 3.285 4.672 17.906 3.2~5 6.957 11.906 3.285 4.168 17.906 3.285 0.320 17.900 3.285 7.430 17.906 3.285 5.879 17.906 3.285 0,152 17.906 3.285 7.805 17.906 3.285 7,605 17.906 3.2~5 /f 430o.000 6P -83.250 GP 114.438 DRHU 0.0~0 NPHi NChb 209~.000 ~CNb 4200.000 8~ -95.875 G~ 114.438 DT DPHO 0.040 NPHi NCN~ 2090.000 kCNb 4100.000 5P -65.969 GR 114.438 DT D~HU 0.040 NPRI NCNb 2096.000 ~CNL 4000.000 SP -101.438 lbD GR 114.438 DT DRHO 0.040 NPHI NCNb 2096.000 ~CNL ~90U.OO0 SP -80.594 1LD GR 114.438 D~HU 0.040 NPHi NCNb 2096.000 ~CNL ]800.000 SP -82.156 ILO (;R 114.438 DT DRM(J 0.040 NPHI NCNb 2096.000 PCNL ~700. 000 SP -69.813 iLD GR 1 I 4. 438 DT D~HU 0.040 NPHI NCNb 2096.000 fCNL 3600.000 5P -70.406 ILD GR 114.438 DT D~H~ 0.040 NPHI NCNb 209~.000 PCNL ~5OO.OOO 6P -87.250 ILD GR 114.438 DT DRHU 0.040 NPH1 NCNb 209~.000 FCNb ~400.000 5P -66.000 GR 114.438 DT DRHU 0.040 NPHi NCNb 2096.000 ~CNL 3300.000 5P -98.938 ILO GR 114.438 DT DRMU 0.040 NPHI NCNb 2096.000 ~CNL VALtJE ~.418 91.~88 ~2.617 690.500 5.88~ 91.18 32.b17 u90.500 5.703 91,188 32.617 690.500 4.363 91.188 ~2.617 e90.500 5.281 91.188 32.617 o90.500 3.863 91.188 32.617 690.500 3.~28 91.188 32.617 090.500 2.646 91.188 32.617 O90.500 2.510 91.188 32.617 690.500 2.889 91.188 32.617 O90.500 1.~94 91.188 32,617 o90.500 MI~MONIC G~ ~H(JB IbM GR ~HOB GR RHO0 GR RHUB 1bM ~HOB GR iLM GR RHOB GR R~OB VALUk 5.9ql 84.688 2.512 5.754 84.088 2.512 4.~8~ 84.688 2.512 4.J44 ~4,688 2.512 4.~24 84.688 2.512 ].596 84.088 2.512 2.943 84.688 2.512 2.422 84.b88 2.512 2.342 84.688 2.512 2.619 84.b88 2.512 1.418 84.b88 2.512 MNkMUNIC LLBU CALl NRAT bbSU CALl NRAT LLSU CALl NRAT LLSU CALl NRAr bbSO CAbI NRA~ LbSO CALl NRAT bbSO CALL NRAI bb8U CAbI NRAT LLSU CALl NRAT LbSU CALl NRA~ 6680 CABi NRAI VAbUE 1.375 17.9o6 3.285 7.099 17.90b 3.285 5.047 17.906 3.285 6.930 17.906 3.285 b.O70 17.906 3.285 4.840 i7.90~ 3.285 3.941 17.906 3.285 3.537 17.900 3.285 4.070 17.906 3.285 3.705 17.90O 3.285 2.990 17.900 3.2~5 Db~PTh g2oO.O00 ]100.000 ]000.000 2900.000 2~00.000 2700.000 2605.50{} MNkMUNIC OHHU N C lq L., L)RHU NCNb GH ORHO NCNb SP GR DRHO NCNb GR NCNb DRHU NCNb bP GR DBHU NCNb VALUE -112.813 114.438 0.040 2090.000 -94.063 114.438 0.040 2090.000 -50.438 114.438 0.04O 2090.000 -99.875 114.438 0.040 2090.000 -91.063 114.438 0.040 2096.000 38.844 114.438 0.0~0 2096.000 33.813 114.438 0.040 2096.000 MN EMONIC DT NPHI ~CNb 1LD OT NPHI DT NPHi FCNL ILL UT NPfll fCNb DT NPHI ~CNL iLD DT NPHI fCNb iLO DT NPHI fCNL VALUE, 1.645 91.188 32.017 690.500 1.857 91.188 32.b17 690.500 2.387 91.188 32.617 690.500 1.219 91.188 32.617 b90.500 1.047 91.188 32.617 690.500 2000.000 91.188 32.617 090.500 2000.000 91.188 32.b17 690.500 MNEMONIC iLM ILM GR ibm GR GR 1 LN GR G~ VALUE 1.b77 ~4.b88 2.512 1.725 84.b88 2.512 2.029 84.688 2.512 1.254 U4.688 2.512 1.007 84.688 2.512 2000.000 ~4.~88 2.512 2000.000 84.088 2.512 MNEMONIC bbSU CALk NRA£ LL8U CALk NRAT LLSU CALl bLSU CALl NHAT LLSU CALl NRA'I LL8U CALl NHAT LbBU CALl NRAT VAbUB 5.930 17.906 3.285 2.711 17.90b 3.285 2.920 17.906 3.285 3.373 11.900 ~.285 2.018 17.90b 3.285 1.041 17.906 3.285 1.Ob~ 17.906 3.285 .SIJ~'INAk ~ (-J~' DATA RI-.CUkDS I'4{JM~L~ [J~ I~LCURDS; 1159 LLNGIH [JF RECORDS; 960 BYTES bENGTtt OI" LAST HLCUHD: 72b BX~[L,S ["ILE 2RAILER IJLNGltt: ~ ILL NANE: LUll .001 MAXIMUM PHYSICAL HLCUI-<D [,kNGIH: NLX'[ f ILL LIJF TAPE I'~AILL~ I, LNG'IH: 152 bYTES '?APL NANE: b0042 SERVICE NAME: kDIl TAPE CONTINUATION NUMBER: 01 NEXT 'IAPE NAMe: 1024 b~TLS DAIL: 801