Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout211-0337. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-21B Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 11000 20" 13-3/8" 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 8707 34 - 114 33 - 2537 30 - 10592 10317- 10859 10282- 14138 34 - 114 33 - 2536 30 - 8424 8223- 8613 8197- 9041 Unknown 470 2670 4760 7020 10540 11000, 12190, 12475, 12500 1490 5380 6870 8160 10160 10862 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 10366 8615 - 9041 Structural 4-1/2" AHC Packer 10280, 8196 10182, 10280 8122, 8196 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 , 0028308 28 - 8259 N/A N/A 170 542 40162 38474 196 1 425 1300 890 200 N/A 13b. Pools active after work:PRUDHOE OIL 5-1/2" Baker SAB Packer 10182 , 8122 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 2:20 pm, May 20, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.05.20 12:52:24 - 08'00' Bo York (1248) JJL 6/13/25 RBDMS JSB 052325 DSR-6/3/25 ACTIVITY DATE SUMMARY 5/1/2025 ***WELL S/I ON ARRIVAL*** DRIFT w/ 20'x2" DUMMY GUNS(2.16") & 2.24" SWAGE TO DEVIATION @ 11,585' SLM ***WELL S/I ON DEPARTURE*** 5/14/2025 TFS U4 (Assist E-line) W/ load well to secure, Initial WHP T/IA/OA= 2300/400/0, Pumped 175 bbls crude down TBG to load well for E-line, Pressured plug up to 500 psi with 2 bbls crude, Final WHP T/IA/OA= 200/400/0 *** Well left in Halliburton E-line control*** 5/14/2025 ***WELL S/I ON ARRIVAL*** (PLUG SET / ADPERF) MIRU HES E-LINE PT PCE 300PSI LOW, 3000PSI HIGH, FUNCTION WLVS T-BIRD LOADED WELL WITH 170 BBL OF CRUDE SET NS MAGNA RANGE CIBP WITH ME AT 11000' CCL-ME=17.2', CCL STOP=10982.8' PT PLUG TO 500PSI AND TAG AFTER PERFORATE 10862' - 10882' WITH 2" 6SPF 60PHASE HSC W/ MAXFORCE CHARGES (.28"EHD, 20.3"TTP) CCL-TS=9.5', CCL STOP=10852.5'. CONFIRM SHOTS FIRED RDMO HES E-LINE ***WELL S/I ON DEPARTURE*** JOB COMPLETE Daily Report of Well Operations PBU 02-21B Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 10/04/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20241004 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BRU 214-13 50283201870000 222117 9/26/2024 AK E-LINE Perf END 2-72 50029237810000 224016 8/26/2024 HALLIBURTON COILFLAG END 2-72 50029237810000 224016 8/29/2024 HALLIBURTON COILFLAG END 2-72 50029237810000 224016 8/29/2024 HALLIBURTON RBT MPI 2-16 50029218850000 188134 9/9/2024 AK E-LINE Perf MPI 2-16 50029218850000 188134 9/20/2024 AK E-LINE Perf MPU B-16 50029213840000 185149 9/28/2024 READ CaliperSurvey MPU B-24 50029226420000 196009 8/20/2024 HALLIBURTON PERF MPU B-28 50029235660000 216027 9/28/2024 HALLIBURTON TUBINGCUT MPU I-01 50029220650000 190090 8/17/2024 HALLIBURTON PERF MPU R-103 50029237990000 224114 9/20/2024 AK E-LINE Hoist MRU M-02 50733203890000 187061 9/23/2024 AK E-LINE Perf PBU 02-21B 50029207810200 211033 9/30/2024 HALLIBURTON RBT PBU L2-10 50029217460000 187085 8/23/2024 HALLIBURTON RBT PBU L-212 50029232520000 205030 9/24/2024 HALLIBURTON IPROF PBU L-254 50029237520000 223030 9/20/2024 HALLIBURTON IPROF PBU P1-17 50029223580000 193051 9/7/2024 HALLIBURTON RBT PBU S-09A 50029207710100 214097 8/21/2024 HALLIBURTON RBT PBU Z-235 50029237600000 223055 9/19/2024 HALLIBURTON IPROF Please include current contact information if different from above. T39619 T39620 T39620 T39620 T39621 T39621 T39622 T39623 T39624 T39625 T39626 T39627 T39628 T39629 T39630 T39631 T39632 T39633 T39634 PBU 02-21B 50029207810200 211033 9/30/2024 HALLIBURTON RBT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.10.04 15:10:24 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-21B Reset LTP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 12190 20" 13-3/8" 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 9050 34 - 114 33 - 2537 30- 10592 10317- 10859 10282- 14138 34 - 114 33 - 2536 30- 8424 8223- 8613 8197- 9041 none 470 2670 4760 7020 10540 12190 , 12475 , 12500 1490 5380 6870 8160 10160 11686 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 10366 9040 - 9041 Structural 4-1/2" AHC Packer , 5-1/2" Baker SAP 8122 , 8196 10182 , 10280 8122 , 8196 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 , 0028308 28 - 8259 165 206 37232 40178 336 237 0 0 734 814 324-210 13b. Pools active after work:PRUDHOE OIL No SSSSV 10182 , 10280 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.07.11 15:26:51 - 08'00' Eric Dickerman (4002) By Grace Christianson at 9:40 am, Jul 12, 2024 RBDMS JSB 071924 WCB 10-1-2024 DSR-7/15/24 ACTIVITYDATE SUMMARY 6/14/2024 ***WELL S/I ON ARRIVAL*** (Profile modification) RAN 2-7/8" BRUSH & 2.25" G. RING TO X-NIP AT 10,282' MD (all clear) T-BIRD LOADED TBG W/ 190 BBLS CRUDE SET 2-7/8" XX-PLUG IN X-NIP AT 10,282' MD(pressure test failed, llr of .04 bpm) PULLED 2-7/8" XX-PLUG FROM X-NIP AT 10,282' MD PULLED 4-1/2" D&D TUBING STOP FROM 10,250' SLM PULLED 4-1/2" NS D&D LTP W/ PTSA (missing element) ***CONTINUE ON 6/15/24 WSR*** 6/14/2024 T/I/O= 2400/400/0 TFS Unit 4 Pumped a total of 197 BBLS of Crude to Load the Tubing for Slickline. Pumped 190 BBLS to Load the Tubing. Then pumped 7 BBLS of Crude to attempt to Test the Plug. ***JOB CONTINUES*** 6/15/2024 ***JOB CONTINUES*** T/I/O = 500/500/0 TFS Unit 1 Assist Slickline Pumped a total of 28.5 BBLS of crude to Assist Slick line down hole. ***JOB CONTINUES*** 6/15/2024 ***CONT FROM 6/14/24 WSR*** (Profile modification) RAN 4-1/2" BRUSH & 3.70" 3-PRONG WIRE GRAB TO DEPLOYMENT SLEEVE AT 10,282' MD (no recovery) RAN 3-1/2" BRUSH & 2.25" 2-PRONG WIRE GRAB TO DEVIATION AT 11,578' SLM (recovered multiple element pieces) RAN 3.75" CENT & 3" BRUSH TO DEPLOYMENT SLEEVE AT 10,282' MD (T-bird pumped 20 bbls crude - good ring on bottom of cent) SET 4-1/2" NS MONO-PAK LTP W/ PTSA AT 10,282' MD T-BIRD ATTEMPTED MIT-T (unable to get above 700 psi) RAN 4-1/2" D&D HOLD FINDER TO TOP OF LTP AT 10,264' SLM (holds 1000 psi) PULLED 2-7/8" RSG-XX PLUG FROM LTP AT 10,282' MD JARRED ON 4-1/2" NS MONO-PAK LTP AT 10,262' SLM FOR 4 HRS ***CONTINUE ON 6/16/24 WSR*** 6/16/2024 ***CONTINUED FROM 6/15/24 WSR*** (Profile modification) PULLED 4-1/2" NS LTP FROM 10,262' SLM(missing 2 elements) RAN 4-1/2" BRUSH & 3.70" 3 PRONG WIRE GRAB TO 10,282' MD (no recovery) RAN 45 KB PTSA DRIFT TO 10,282' MD (no marks on brass tabs - seals torn) RAN 3.78" SWAGE TO 10,282' MD (jarred down 30 min - clean ring on bottom) RAN 3-1/2" BRUSH & 2.25" 2 PRONG WIRE GRAB TO 11,207' SLM (unable to get further - no recovery) RAN 45 KB PTSA DRIFT TO 10,282' MD (good ring on brass tabs - seals look good) T-BIRD LOADED TBG W/ 200 BBLS ***CONTINUE ON 6/17/24 WSR*** 6/16/2024 ***JOB CONTINUES*** T/I/O=1400/400/0 TFS Unit 1 Assist Slickline. Pumped a total of 200 BBLS to Load the Tubing for Slickline. Job continues. 6/17/2024 ***JOB CONTINUED From 6-16-2024*** T/I/O=450/400/0 TFS Unit 1 Assist Slickline Pumped a total of 2 BBLS of Crude to Test Plug for Slickline. After a 15 minute test the Tubing lost 50 psi. Slickline in control of well upon departure. FWHP= 700/400/0 Daily Report of Well Operations PBU 02-21B gg ) SET 4-1/2" NS MONO-PAK LTP W/ PTSA AT 10,282' MD (g ) RAN 4-1/2" D&D HOLD FINDER TO TOP OF LTP AT 10,264' SLM (holds 1000 psi) PULLED 2-7/8" RSG-XX PLUG FROM LTP AT 10,282' MD JARRED ON 4-1/2" NS MONO-PAK LTP AT 10,262' SLM FOR 4 HRS () PULLED 4-1/2" NS LTP FROM 10,262' SLM(missing 2 elements) Daily Report of Well Operations PBU 02-21B 6/17/2024 ***CONTINUED FROM 6/16/24 WSR*** (Profile modification) SET 4-1/2" NS MONO-PAK LTP W/ PTSA AT 10,282' MD TOP OF PACKER @ 10265' T-BIRD PERFORMED PASSING PRESSURE TEST ON LTP (see log) PULLED 2.31" RSG PLUG FROM LTP AT 10,282' MD ***WELL S/I ON DEPARTURE*** ( SET 4-1/2" NS MONO-PAK LTP W/ PTSA AT 10,282' MD TOP OF PACKER @ 10265'@ T-BIRD PERFORMED PASSING PRESSURE TEST ON LTP LTP is shown correctly on the WBS below. -WCB 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-21B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 12190 20" 13-3/8" 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 9050 34 - 114 33 - 2537 30- 10592 10317- 10859 10282- 14138 34 - 114 33 - 2536 30- 8424 8223- 8613 8197- 9041 none 470 2670 4760 7020 10540 12190 , 12475 , 12500 1490 5380 6870 8160 10160 11686 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 10366 9040 - 9041 Structural 4-1/2" AHC Packer , 5-1/2" Baker SAP 8122 , 8196 10182 , 10280 8122 , 8196 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 , 0028308 28 - 8259 0 165 0 37232 0 336 0 0 0 734 324-210 13b. Pools active after work:PRUDHOE OIL No SSSSV 10182 , 10280 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:08 pm, Jun 13, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.06.12 20:46:30 - 08'00' Bo York (1248) RBDMS JSB 061924 WCB 8-30-2024 DSR-6/13/24 ACTIVITYDATE SUMMARY 5/13/2024 LRS CTU #1, 1.5" CT. Job Objective: CIBP & Extended Adperf MIRU and make up 1-11/16" NS MHA and HES GR/CCL in 2.20" carrier with 2.25" DJN. Log from 12300 to 9900 CTM flagging pipe for CIBP set at 12175. Log shows a - 15' correction. Confirmed with OE. Make up and RIH with CIBP setting BHA. ***Job Continued on 5/14/2024*** 5/14/2024 LRS CTU #1, 1.5" CT. Job Objective: CIBP & Extended Adperf Continue RIH with CIBP setting BHA. Bump test H2S/LEL monitors. Set 2-7/8" CIBP at 12190'. Circulate a bottoms up of KCL to get the gas out of the well. Pressure test the plug to ~ 500 psi (0.1 BPM LLR). Perform a well control drill for open hole deployment / kick while tripping. Lay down NS setting tool (recover 3/8" and 7/16" balls). Deploy 376' of 2" HES MaxForce, 6 SPF, 60 degree phase guns. RIH and perforate 11686' - 12062'. POOH maintaining hole fill with KCL. Perform well control drill for open hole deployment. Lay down perf guns (all shots fired in scallop, 1/2" ball recovered). Rig down scaffolding and LRS CTU #1. The tubing is left with a 13 BBL 50/50 cap on the well. Operations to POP on LRS departure. ***Job Complete*** Daily Report of Well Operations PBU 02-21B RIH and)y perforate 11686' - 12062'. Set 2-7/8" CIBP at 12190'. CIBP and adperfs are correctly shown on WBS, below. -WCB Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 4/17/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240417 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# MPU F-46 50029224500000 194027 4/13/2024 READ CaliperSurvey PBU 02-21B 50029207810200 211033 2/26/2024 BAKER MRPM PBU 02-24A 50029207440100 204030 2/25/2024 BAKER MRPM Please include current contact information if different from above T38715 T38716 T38717 PBU 02-21B 50029207810200 211033 2/26/2024 BAKER MRPM Meredith Guhl Digitally signed by Meredith Guhl Date: 2024.04.19 13:29:38 -08'00' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 02-21B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 ADL 0028311 , 0028308 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 12475 20" 13-3/8" 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 9049 34 - 114 33 - 2537 30- 10592 10317- 10859 10282- 14138 2500 34 - 114 33 - 2536 30- 8424 8223- 8613 8197- 9041 none 470 2670 4760 7020 10540 12475 , 12500 1490 5380 6870 8160 10160 12280 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 103669048 - 9041 Structural 4-1/2" AHC Packer , 5-1/2" Baker SAP No SSSSV 10182 , 10280 8122 , 8196 Date: Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY 5/1/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:21 pm, Apr 10, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.04.09 12:24:33 - 08'00' Bo York (1248)  2500 Perforate DSR-4/12/24 10-404 MGR10APR24 * Approved for service coil operations with 24 hour crew and WSS coverage. SFD 4/15/2024JLC 4/16/2024 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.04.16 20:43:35 -04'00'04/16/24 RBDMS JSB 041724 Plug & Perf Procedure 02-21B PTD:211-033 Well Name:02-21B Add Perf API Number:50-029-20781-02-00 Current Status:Offline Uncompetitive Rig:CTU Estimated Start Date:05/01/2024 Estimated Duration:2days Regulatory Contact:Carrie Janowski Permit to Drill Number:211-033 First Call Engineer:David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number:IOR 80 Current Bottom Hole Pressure:3,380 psi @ 8,800’ TVD 7.4 PPGE | SBHPS taken as analog from offset 01-20. Max. Anticipated Surface Pressure:2,500psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 2,500psi (Taken on 03/27/2023 Slickline) Min ID:2.31” ID – X Nipple @ 10,282’MD Max Angle:100 Deg @13,460’ Reference Log: SLB GR-CCL Log Dated 13-May-2011 Brief Well Summary: 02-21B is a CTS completed in Z2A/B in May 2011. The original toe and mid lateral perfs were plugged in 2023 and 125ft of Z2A was added. They are currently uncompetitive. Objective: The objective of this procedure is to plug the current perforations and shoot additional Z2A perforations from 11,686-12,062 (376ft). Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 200 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 171 bbls b. 4-1/2” Tubing – 10,252’ X .0152bpf = 156 bbls c. 3-1/2” Liner - 85’ X .0087bpf = 0.8 bbls d. 3-3/16” Liner - 1422’ x .0079 = 11.2 bbls e. 2-7/8” Liner – 521’ X .0058bpf = 3 bbls 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Run past 12,175’ctmd and log OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. 6. RIH and set 2-7/8” CIBP at ~12,175ft. (Note min ID is X nipple at 10,282’). Verify tubing is full and pressure test to 500-psi. Plug & Perf Procedure 02-21B PTD:211-033 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 9.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. 02-21B Addperf Schedule *HES 2” maxforce guns were used to estimate for this job. If unavailable, use another vendor as needed. 11. MU lubricator and RIH withperf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well dead and hole full. 13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. Standing orders flow chart included with this sundry request. 14. RDMO CTU. 15. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet 8. Changes to Approved Sundry Perf Interval Perf Length Gun Length Weight of Gun (lbs) 11,686-12,062’ 376’376’2,105lbs (5.6ppf) Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. - mgr *Rekill well if necessary before pulling to surface. - mgr. * Pump pipe displacement while POOH. - mgr Perform drill by picking up safety joint with TIW valve and space out before MU guns. - mgr Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. - mgr Plug & Perf Procedure 02-21B PTD:211-033 Current Wellbore Schematic Plug & Perf Procedure 02-21B PTD:211-033 Proposed Schematic Plug & Perf Procedure 02-21B PTD:211-033 Coiled Tubing BOPs Plug & Perf Procedure 02-21B PTD:211-033 Equipment Layout Diagram Plug & Perf Procedure 02-21B PTD:211-033 Standing Orders for Open Hole Well Control during Perf Gun Deployment Plug & Perf Procedure 02-21B PTD:211-033 02-21B Mini Log Plug & Perf Procedure 02-21B PTD:211-033 02-21B Tie-In Log Plug & Perf Procedure 02-21B PTD:211-033 Plug & Perf Procedure 02-21B PTD:211-033 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-21B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 12475 20" 13-3/8" 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 9049 34 - 114 33 - 2537 30- 10592 10317- 10859 10282- 14138 34 - 114 33 - 2536 30- 8424 8223- 8613 8197- 9041 none 470 2670 4760 7020 10540 12475 , 12500 1490 5380 6870 8160 10160 12280 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 10366 9048 - 9041 Structural 4-1/2" AHC Packer , 5-1/2" Baker SAB 8122 , 8196 10182 , 10280 8122 , 8196 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 , 0028308 28 - 8260 272 195 39510 28894 1815 1411 0 0 836 746 323-254 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 10182 , 10280 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:40 pm, Sep 27, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.09.27 12:54:29 -08'00' RBDMS JSB 100323 WCB 4-11-2024 DSR-9/27/23 ACTIVITYDATE SUMMARY 8/30/2023 CTU #9, 1.75" 0.156" CT Job Scope: Travel to location. MIRU. MY YJ MHA and HES memory log. RIH log well, POOH ***Continue WSR to 8/31/2023*** 8/31/2023 CTU #9, 1.75" 0.156" CT Job Scope: Set Plug, Ext. Add Perf Pressure Test Safety Joint. RIH with YJ 2 7/8" CIBP. Correct depth at flag, set at 12,500'. Roll reel to KWF, POOH, L/D YJ CIBP setting tool. Still have injectivity, decide to set second YJ CIBP @ 12475'. Still have injection. OE decided to continue with Add Perfs. Possible LTP leak. RIH with 2" Max Force HES guns, 60 deg Phase, 6 SPF. 125'. ***Continue WSR to 9/1/23*** 9/1/2023 CTU #9, 1.75" 0.156" CT Job Scope: Set Plug, Ext. Add Perf RIH with 2" Max Force HES guns, 60 deg Phase, 6 SPF. 125'. Perforate 12280' - 12405'. L/D Spent Guns. FP Well 38 bbls Diesel. RDMO. ***Job Complete*** Daily Report of Well Operations PBU 02-21B Still have injectivity,gjy decide to set second YJ CIBP @ 12475'. Still have injection. OE decided to continue@ with Add Perfs. Possible LTP leak. RIH with YJ 2 7/8" CIBP. Correct depth at flag, set atg 12,500' Perforate 12280' - 12405'. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 02-21B Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-033 50-029-20781-02-00 ADL 0028311 , 0028308 14184 Conductor Surface Intermediate Liner Liner 9040 80 2504 10562 542 3856 14098 20" 91.5# H-40 13-3/8" 72# L-80 9- 5/ 8" 7" 3-1/2" x 3-3/16" x 2-7/ 8" 9041 34 - 114 33 - 2537 30- 10592 10317- 10859 10282- 14138 2500 34 - 114 33 - 2536 30- 8424 8223- 8613 8197- 9041 none 470 2670 4760 7020 10540 none 1490 5380 6870 8160 10160 12900 - 14092 4-1/2" 12.6# 13Cr85 / N-80 28 - 103669049 - 9041 Structural 4-1/2" AHC Packer , 5-1/2" Baker SAB No SSSV Installed 10182 , 10280 8122 , 8196 Date: Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY 5/15/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 10/2022 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov 323-254 By Kayla Junke at 10:35 am, Apr 25, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.04.21 08:53:48 -08'00' DSR-4/26/23 10-404 CO 341J MGR24MAY23 MDG 4/28/2023 GCW 05/25/23JLC 5/25/2023 05/25/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.05.25 11:07:38 -05'00' RBDMS JSB 052523 Plug & Perf Procedure 02-21B PTD:211-033 Well Name:02-21B Plug, Add Perf API Number:50-029-20781-02-00 Current Status:Offline Uncompetitive Rig:CTU Estimated Start Date:05/15/2023 Estimated Duration:2days Regulatory Contact:Carrie Janowski Permit to Drill Number:211-033 First Call Engineer:David Bjork (907) 440-0331 (c) Second Call Engineer: AFE Number:IOR 80 Current Bottom Hole Pressure:3,380 psi @ 8,800’ TVD 7.4 PPGE | SBHPS taken as analog from offset 01-20. Max. Anticipated Surface Pressure:2,500psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 2,500psi (Taken on 03/27/2023 Slickline) Min ID:2.31” ID – X Nipple @ 10,282’MD Max Angle:100 Deg @ 13,460’ Reference Log: SLB GR-CCL Log Dated 13-May-2011 Brief Well Summary: 02-21B is a CTS completed in Z2A/B in May 2011. The original toe and mid lateral perfs are currently uncompetitive. Objective: The objective of this procedure is to plug the current perforations and shoot additional Z2A perforations from 12,280-12,405 (125ft). Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 200 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 182 bbls b. 4-1/2” Tubing – 10,252’ X .0152bpf = 156 bbls c. 3-1/2” Liner - 85’ X .0087bpf = 0.8 bbls d. 3-3/16” Liner - 1422’ x .0079 = 11.2 bbls e. 2-7/8” Liner – 2333’ X .0058bpf = 14 bbls 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Run past 12500’ctmd and log OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. 6. RIH and set 2-7/8” CIBP at ~12,500ft. (Note min ID is X nipple at 10,282’). Verify tubing is full and pressure test to 500-psi. Plug & Perf Procedure 02-21B PTD:211-033 7. At surface, prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 9.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 10. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below. 02-21B Addperf Schedule *HES 2” maxforce guns were used to estimate for this job. If unavailable, use another vendor as needed. 11. MU lubricator and RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 12. POOH. Stop at surface to reconfirm well dead and hole full. 13. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. Standing orders flow chart included with this sundry request. 14. RDMO CTU. 15. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Tie In Log/Perf Sheet 8. Changes to Approved Sundry Perf Interval Perf Length Gun Length Weight of Gun (lbs) 12,280-12,405’125’125’700lbs (5.6ppf) Plug & Perf Procedure 02-21B PTD:211-033 Current Wellbore Schematic Plug & Perf Procedure 02-21B PTD:211-033 Proposed Schematic Plug & Perf Procedure 02-21B PTD:211-033 Coiled Tubing BOPs Plug & Perf Procedure 02-21B PTD:211-033 Equipment Layout Diagram Plug & Perf Procedure 02-21B PTD:211-033 Standing Orders for Open Hole Well Control during Perf Gun Deployment Plug & Perf Procedure 02-21B PTD:211-033 02-21B Mini Log Plug & Perf Procedure 02-21B PTD:211-033 02-21B Tie-In Log Plug & Perf Procedure 02-21B PTD:211-033 Plug & Perf Procedure 02-21B PTD:211-033 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA OLASKA OIL AND GAS CONSERVATION COMMI • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 211-033 3. Address: P.O.Box 196612 Anchorage, Development l Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20781-02-00 7. Property Designation(Lease Number): ADL 028308&028311 8. Well Name and Number: PBU 02-21B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ,, % F: . Total Depth: measured 14184 feet Plugs . " A measured None feet true vertical 9040 feet JunkOCTNone feet easured �� 20 2 ;015�,, Effective Depth: measured 14098 feet Packer measured 10182,10280 feet true vertical 9041 feet Packer true vertical 8122,8196 feet OGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 34-114 34-114 1490 470 Surface 2504 13-3/8" 33-2537 33-2536 4930 2670 Intermediate 10562 9-5/8" 30-10592 30-8424 6870/8150 4760/5080 Liner 10562 7" 10317-10859 8223-8613 8160 7020 Liner 3856 3-1/2"x3-3/16" 10282-14138 8197-9041 x2-7/8" Perforation Depth: Measured depth: 12900-14092 feet 3LANNED True vertical depth: 9049-9041 feet Tubing(size,grade,measured and true vertical depth) 4-1/2",12.6#,13Cr85/N-80 28-10364 28-8259 Packers and SSSV(type,measured and 4-1/2"AHC Packer 10182 8122 true vertical depth) 5-1/2"Baker SAB Packer 10280 8196 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: o 0 0 0 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations RI Exploratory ❑ Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Kirchner,Carolyn J Email Carolyn.Kirchner@bp.com Printed Name Joe Lastuf k. Title Drilling Technologist I) Signature Phone +1 907 564 4091 Date to/24/i 5 Form 10-404 Revised 5/2015 Vr1."' j d j , .1/ 'S t /0"7/-(1RBDMS� L 1 L Z 2015 Submit Original Only • • 02-21 B, Well History (Pre-Rig Workover) T/I/O = SSV/0/0, Temp: SI, PPPOT-T(PASS) PPPOT-IC (PASS) Pre RWO PPPOT-T: Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, all moved freely. Torqued to 350 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 150 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, 18 of 28 LDS are stuck in and ends started twisting. The rest were tight but functioned. Torqued good LDS to 350 ft/lbs. Single port, unable to pump through void. Pressured test void to 3,500 psi for 30 minute test. Lost 200 psi in 15 minutes, 8/6/2015 lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. T/I/O =SSV/0/0, Temp: SI, Repair leaking wellhead (complete) Found multiple LDS on CSG head to have residual kroil on them from Pre RWO. Stung into test void, (0 psi). Torqued all gland nuts to 400 ft/lbs. Cleaned all residual fluid from pins and replaced absorb underneath to monitor for leaks. PT test void to 3,500 psi. No leaks. Leaks 8/8/2015 mitigated. ***WELL S/I UPON ARRIVAL***(rwo expense) RIG UP SWCP 4518 8/10/2015 ***WSR CONTINUED ON 08/11/15*** ***WSR CONTINUED FROM 08/10/15***(rwo expense) DRIFT W/8'x4.50" D. WHIPSTOCK &4.50" LIB, TAG LTP @ 10203' SLM(impression of Itp fn) PLANT 5-1/2"WFD ERD PULLING TOOL IN 5-1/2"WFD ERD PKR @ 10102' SLM JAR ON 5-1/2"WFD LTP © 10200' SLM FOR—1.5hrs BEFORE LTP COMES FREE(see log for details) 8/11/2015 ***WSR CONTINUED ON 08/12/15*** ***WSR CONTINUED FROM 08/11/15***(rwo expense) PULL 5-1/2"WFD ERD PKR x 2-7/8" LINER XO FROM 10201'SLM/10230' MD (missing partial spring from 5-1/2" element and mule shoe btm) TAG DEPLOYMENT SLEEVE @ 10,257' SLM W/5-1/2" BLB AND 4.50" 3 PRONG WIRE GRAB(no recovery) RECOVER LOST MULE SHOE BTM FROM WFD ERD PKR FROM 10,263' SLM W/2.75" CENT/2-7/8" BLB ASSY DRIFT W/8'x4.50" D. WHIPSTOCK&4.50" LIB, TAG TOP OF DEP SLV © 10258' SLM(impression of dep slv fn) 8/12/2015 ***WELL LEFT S/I UPON DEPARTURE*** ***WELL SHUT IN ON ARRIVAL*** (SLB E-LINE - SET PLUG AND CUT TUBING) INITIAL T/I/O = 100/0/0 RIH WITH HEAD/ ERS/CCL/BAKER 45-A2 WIRELINE SET 5 1/2" RETRIEVABLE BRIDGE PLUG. PLUG SET AT 10263' (ME) (top © 10260.35',OAL 4.10') CCL TO MID ELEMENT = 11.5', CCL STOP DEPTH = 10251.5', LOG CORRELATED TO TUBING TALLY DATED 01-MAY-1982. RIH WTIH HEAD/ ERS/CCL/SHOCK SUB/4.15 POWER CUTTER. CUT TUBING AT 10224' no psi change see after cutting CCL TO CUTTER = 16.25'/CCL STOP DEPTH = 10207.75'/ LOG CORRELATED TO TUBING TALLY DATED 01-MAY-1982 FINAL T/I/O = 100/0/0 8/13/2015 ***JOB COMPLETE. WELL S/I UPON DEPARTURE *** • • 02-21 B, Well History (Pre-Rig Workover) T/I/O = 160/0/0. Temp = SI. T FL(E-line request). No AL. T FL @ 210', 5 bbls. 8/13/2015 SV, WV, SSV= C. MV= 0. IA, OA= OTG. 04:50. T/I/O = SSV/0/0, Temp: SI, Pump kroil into IC test void Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Single port, unable to pump through void. Pumped kroil into void and left 1,000 psi in test void. Suggest once well is secure to hold open bleed on WHP's and remove one LDS and drain void of all hydraulic fluid. Pump void full of kroil and leave 1,000 psi on it to help 8/15/2015 loosen stuck LDS. T/I/0= 196/0/6 Temp= SI (Pre-RWO/Circ-Out) MIT-OA 1200 psi ***PASSED*** CMIT- TxIA 3500 psi ***PASSED*** Pumped 4 bbls 50*F meth down OA to reach MIT-OA pressure of 1200 psi. Test results follow: 1st 15 min OA lost 59 psi. 2nd 15 min OA lost 21 psi for a total of 80 psi over a 30 min test. Pumped 1 bbl of meth followed by 14 bbls of 80*F crude down IA to verify TxIA communication and achieve CMIT-TxIA pressure 3500 psi. CMIT-TxIA lost 42/41 psi in the 1st 15 min and 17/18 psi in the 2nd 15 min for a total TxIA pressure loss of 59/59 psi in 30 min test. Pumped 5 bbls of meth followed by 1028 bbls of 110*F 3% kcl down Tbg taking returns up IA and down 02-22's flowline to circ out well. Pumped 170 bbls of 50*F diesel down Tbg then U-Tubed TxIA for freeze protect. SV,WV,SSV=closed MV=open IA,OA=otg. FWHP=520/520/15. MIT tags hung on WV,MV,IA,OA valves. Fluid packed annulus sign on tree. DSO notified of well status on 8/20/2015 departure. T/I/0 = 0/0/0. Temp =SI. Cement B&C line(Pre RWO). Pumped 4 gal of hydraulic fluid, followed by 2.5 gal of cement down the B&C lines. Placed a hydraulic cap on top of cement to clear gauges. B&C line pressures @ 0 psi upon completion. Final WHPs =0/0/0. 8/21/2015 SV,WV,SSV = C. MV =0. IA, OA= OTG. NOVP. 1600 hrs. T/I/0 = 0/0/0. Temp = SI. Assist Cameron (Pre RWO). Hold open bleed. IAP, OAP were @ 0 psi upon arrival. IAP, OAP remain unchanged after being shut in. Final WHPs =0/0/0. 8/21/2015 SV,WV,SSV= C. MV = 0. IA, OA =OTG. NOVP. 1045 hrs. T/I/0 = SSV/0/0, Temp: SI, Pump kroil into test void. (Complete) Pre LDS drillout. Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. DHD bled IAP & OAP to 0 psi and held open bleed. Removed LDS to drain void of hydraulic fluid. Measured depth of LDS for drill out(6-3/4"from hanger to OD of wellhead). Tap threads, install new LDS assembly, &torque to 350 ft/lbs. Single port, pumped kroil into test void. Presssured void to 1,500 psi and monitored for 15 minutes. No loss of pressure. 8/21/2015 Left 1,500 psi in void. T/I/0 = SSV/0/0, Temp: SI, Pump Kroil into IC test void. Removed alemite cap and noticed ball was not checking all the way. Stung into void, (100 psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Replaced alemite fitting and PT to 3,500 psi, no leaks. Bled pressure to 1,000 psi and left in void. Will check 8/22/2015 pressure tomorrow to verify 1,000 psi still in void. T/I/O = SSV/Vac/Vac. Temp = SI. PT C&B lines to 3500 psi (pre rig). No AL. PT Control Line and Balance Line with hydraulic fluid. Control Line lost 69 psi in 5 min. Balance Line lost 71 psi in 5 min. 8/24/2015 SV, WV, SSV = C. MV= 0. IA, OA = OTG. NOVP. 1300 T/I/0 =Vac/Vac/0+. Temp = SI. Assist Cameron w/LDS drill outs (Pre RWO). No AL. Maintained an open bleed on the IA& OA and assisted Cameron while drilling out lockdown screws. FW Ps =Vac/0/0. 8/25/2015 SV, WV = C. SSV, MV = 0. IA, OA= OTG. 1950 hrs. • • 02-21 B, Well History (Pre-Rig Workover) T/I/0=0/0/0, Temp=SI. LDS drillout (pre RWO). Stung into test port(0+ psi), bled to 0 psi. RU wachs drill and drilled out 1 of 10 stuck LDS on casing head. Installed blanking pin and will finish tapping threads in the AM. Left well 8/25/2015 secure. T/I/0=0/0/0, Temp=SI. LDS drillout (pre RWO). Stung into test port(0 psi). RU wachs drill and drilled out the second of ten stuck LDS on casing head. Installed blanking pin and will finish tapping threads in the AM. Left well 8/26/2015 secure. T/I/0 = S/I/0/0. Reviewed permit, conducted PJSM( assisted Cameron wellhead tech). Verified VR plug in 0/A, companion side.. Replaced pad studs, installed needle valve on 8/26/2015 tapped blind. Torqued blind to API spec., 401 ft-lbs; L7 coated. T/I/0 =Vac/0/0. Temp =SI. Assist Cameron (LDS drill out). No AL. Maintained an open bleed on the IA& OA. Assisted Cameron drilling out lockdown screws. FWPs =Vac/0/0. 8/26/2015 SV, WV= C. SSV, MV = 0. IA, OA = OTG. 1730 hrs. T/1/I =Vac/0/0. Temp =SI. Assist Cameron (LDS drill out). No AL. Bled the IA& OA to 0 psi and asssisted Cameron w/ LDS drill outs. FWPs = Vac/0/0. 8/27/2015 SV, WV = C. SSV, MV= 0. IA, OA = OTG. 1930 hrs. T/I/O=0/0/0, Temp=Sl. LDS drillout(pre RWO). Stung into test port(0+ psi), bled to 0 psi. RU wachs drill and drilled out 2 of 10 stuck LDS on casing head. 6 left to complete, installed blanking pins and will finish tapping threads in 8/27/2015 the AM. Left well secure. T/I/0 =0/0/0. Installed new Companion OA 3" CIW Tagged #09 . Torqued and PT'd to API specs. (PASSED). Pulled VR Plug. Set VR plug in working side OA. Removed old 3" FMC 75 off working side OA. Installed blind flange. Torqued and PT'd to API specs. (PASSED). 8/27/2015 RDMO. ***Job Complete*** Final WHP's =0/0/0. T/I/0 =Vac/0/0. Temp = SI. Assist Cameron (LDS drill outs). No AL. Maintained an open bleed on the IA&OA. Assisted Cameron drilling out lockdown screws. FWPs =Vac/0/0. 8/28/2015 SV, WV = C. SSV, MV= 0. IA, OA = OTG. 1900 hrs. T/I/0=0/0/0, Temp=Sl. LDS drillout(pre RWO). Stung into test port(0+ psi), bled to 0 psi. RU wachs drill and drilled out 1 of 10 stuck LDS on casing head. 5 left to complete, 2 LDS are complete, 3 have blanking pins and will finish tapping threads. Left well secure. 8/28/2015 T/1/0=0/0/0, Temp=Sl. LDS drillout(pre RWO). Stung into test port(0 psi). RU wachs drill and drilled out 2 of 10 stuck LDS on casing head. 3 left to complete, 2 LDS are complete, 5 have blanking pins and will finish tapping threads. 8/29/2015 Left well secure. T/I/0 =Vac/0/0. Temp = SI. Assist Cameron (Drill out LDS). No AL. Maintained an open bleed on the IA& OA. Assisted Cameron drilling out LDS. FWPs =Vac/0/0. 8/29/2015 SV, WV= C. SSV, MV = 0. IA, OA OTG. 1930 hrs. • . 02-21 B, Well History (Pre-Rig Workover) T/I/O=0/0/0, Temp=Sl. LDS drillout(pre RWO). Stung into test port(0 psi). Removed blanking pin to tap out profile drilled yesterday. Discovered MFG defect in the LDS profile, profile was not drilled square to the flange. It appears all LDS profiles on this flange are the equally out of spec. Discussed issue with 8/30/2015 WIC/WIE, job postponed for engineer review. T/I/O =Vac/0/0. Temp = SI. Assist Cameron (LDS drill out). No AL. Maintained a bleed on the IA& OA. Assisted Cameron drilling out lockdown screws. FWPs =Vac/0/0. 8/30/2015 SV, WV = C. SSV, MV = O. IA, OA = OTG. 1800 hrs. T/I/O=SSV/0/0, Temp=Sl. LDS drillout(pre RWO). Stung into IC test void (0 psi). RU wachs drill to one of three remaining stuck LDS. Shimmed drill to match abnormal LDS profile as per Team Lead. Drilled out LDS, good drill out all threads in good condition. Installed new LDS as blank. 9/2/2015 T/I/0 = SSV/0/0. Temp = SI. Bleed IA& OA(Assist Cameron). No AL, flowline, wellhouse or scaffolding. Maintained a bleed on the IA& OA. Assisted Cameron drilling,lockdown screws. FWPs = SSV/0/0. 9/2/2015 SV, WV = ?. SSV, MV = C. IA, OA = OTG. 1900 hrs. T/I/O = SSV/0/0. Temp = SI. Bleed IA& OA(Assist Cameron). No AL, wellhouse, flowline or scaffolding. Maintained a bleed on the IA&OA. Assisted Cameron drilling out lockdown screws. FWPs =SSV/0/0. 9/3/2015 SV, WV= ?. MV = C. IA, OA = OTG. 1830 hrs. T/I/O=SSV/0/0, Temp=SI. LDS drillout(pre RWO). Stung into IC test port(0 psi). RU Wachs drill and drilled out 1 stuck LDS. Tapped 4 LDS 9/3/2015 profiles and installed 3 new LDS assemblys and 1 blank. Left well secure. T/I/O=SSV/0/0, Temp=SI. LDS drillout(pre RWO). Stung into IC test port(0 psi). RU wachs drill and drilled out last remaining stuck LDS, good threads. Tapped last 2 profiles, installed 1 new LDS assembly and re-enstalled blank. Left 9/4/2015 well secure. T/I/O = SSV/0/0. Temp =SI. Bleed IA&OA(Assist Cameron). No AL, wellhouse, flowline or scaffolding. Maintained an open bleed on the IA&OA. Assisted Cameron drilling out lockdown screws. FWPs = SSV/0/0. 9/4/2015 SV, WV = ?. MV = C. IA, OA= OTG. 1900 hrs. T/I/O= 300/300/0. Start barriers list= VR plug for annulus work. BPV(ISA 5"#539) x MV. Installed piggy back valves IA(#18) OA(#67) both 3" CIW. Torqued and PT'd to API specs. verified OA VR plug on front-side of casing spool. Pumped up tree to 300psi through IA casing valves. RU CIW lubricator with ISA setting tool and 5" ISA BPV#539. Ran down polish rod 120" and set plug. RD lubricator and removed upper tree. Installed Temp 5" FMC SV#37. Torqed and PT'd to API specs. RDMO***Job in Progress*** SEE LOG FOR 9/5/2015 DETAILS. Final T/I/O=0/0/0 T/I/O = BPV/0+/0. Temp =SI. Bleed IA&OA(Assist Cameron). No AL, wellhouse, flowline or scaffolding. Dry hole tree installed. Maintained a bleed on the IA&OA. Assisted Cameron replacing lockdown screws. FWPs = BPV/0/0. 9/5/2015 SV = ?. MV = C. IA, OA= OTG. • • • 02-21 B, Well History (Pre-Rig Workover) T/I/O=BPV/0/0, Temp=Sl. LDS drillout(pre RWO). PPPOT-IC (PASS). Stung into IC test port(0 psi). Removed blanking LDS and installed new LDS assemblies. 6 LDS locations are equiped with Gen 3 LDS (marked w/yellow paint stick). 1 profile has a broken tap (blanked)will clear hanger. PPPOT-IC: 0 psi in test void. Single port, unable to pump through void. Pressued void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled 9/5/2015 void to 0 psi. • • North America-ALASKA-BP Page 1 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. WWI:500292078100 Active datum:02-21©64.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/16/2015 12:00 - 13:00 1.00 MOB P PRE MOBILIZE RIG FROM 14-26 TO 02-21B -MOVE RIG OFF OF 14-26 -MOBILIZE RIG MATS -SET RIG IN PLACE FOR ADEC,AIR QUALITY PERMIT INSPECTION 13:00 - 16:00 3.00 MOB P PRE ADEC AIR QUALITY PERMIT INSPECTION **SENT 24 HR NOTIFICATION FOR BOPE TEST AT 13:40** 16:00 - 19:00 3.00 MOB P PRE MOBILIZE RIG ON THE DRILL SITE -MOVE RIG ON THE DRILL SITE TO THE ENTRANCE OF THE SPNE ROAD 19:00 - 00:00 5.00 MOB P PRE RIG ON THE SPINE ROAD -MOBILIZE RIG ON THE SPINE WITH SECURITY ESCORT AT 23:30 RIG ENCOUNTERED A SOFT SPOT IN THE OXBOW ROAD NEAR THE ENTRANCE TO DRILL SITE 15. -RIG WAS STOPPED AND BACKED UP TO A SAFE DISTANCE -DDI NOTIFIED SECURITY,ROADS AND PADS AND THE WSL OF THE SITUATION -GRAVEL AND MORE RIG MATS WERE BROUGHT TO THE AREA. 9/17/2015 00:00 - 04:00 4.00 MOB N WAIT PRE GRAVEL WORK TO THE ROAD. -CONTINUE WAITING ON ROADS AND PADS TO SET GRAVEL AND PLACE MORE RIG MATS 04:00 - 14:00 10.00 MOB P PRE MOBILIZE RIG FROM OXBOW RD TO THE DS 02 TURN OFF -HELD SPILL DRILL IN THE FRONT WHEEL WELL-CRT:1:55 -RIG ON DS-2,PREP FOR MOVING RIG AROUND TO BACK SIDE OF THE PAD -PJSM FOR TO NAVIGATE TIGHT CORNER LEADING FROM FRONT SIDE OF THE PAD TO THE BACK. 14:00 - 17:00 3.00 MOB P PRE RIG ON BACKSIDE OF THE PAD. -PJSM FOR REMOVAL OF BOOSTER WHEELS -REMOVE BOTH FRONT AND REAR BOOSTER WHEELS 17:00 - 20:00 3.00 MOB P PRE PJSM AND BACK RIG OVER 02-21B. -LINE UP RIG ON MATS WITH WELL 02-21 -HOLD PJSM WITH CREW. -SET DRIVE SYSTEM TO"CREEP"MODE. -TEST MOVE SYSTEM ESD 20'FROM WELL. -BACK OVER WELLAND LINE UP ROTARY TABLE WITH WELL CENTER.LINE UP WITH WELLHEAD VERIFY WELL HEAD PRESSURES,T/I/O 0/0/0 -CONTACT DSO TO WITNESS RIG MOVING ONTO WELL 02-21 *DSO WAIVED WITNESS. Printed 10/5/2015 11:03:49AM 4110 North America-ALASKA-BP • Page 2 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UW:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 00:00 4.00 MOB P PRE SKID RIG FLOOR INTO DRILLING POSITION. -HOOK UP SERVICE LINES TO RIG FLOOR -SPOT ROCK WASHER,RU CIRCULATION MANIFOLD -SPOT AND SECURE THE CREW MEETING TRAILER. -R/U COMMUNICATIONS IN WSL OFFICE. 9/18/2015 00:00 - 04:00 4.00 RIGU P PRE RIG UP OPERATIONS PJSM,RIG UP RIG FLOOR,BEAVER SLIDE, MUD LINE,CHOKE LINE,MUD BUCKET LINE, CEMENT LINE,SERVICE LINES,FLARE LINE. SPOT ROCK WASHER,TAKE ON 1 LOAD OF SEA WATER INTO PITS,PREP MUD PUMPS, RUN COMMS, *RIG ACCEPTED AT 03:00 HOURS. 04:00 - 06:30 2.50 RIGU P PRE PRESSURE TEST THE RIG HARDLINES -PJSM FOR PRESSURE TESTING,VERIFY CORRECT LINE UP AND DISCUSS PRESSURE CROSS CHECK. -PT TO 250 LOW,3500 PSI HIGH,LEAK TIGHT **PERFORM RIG EVACUATION DRILL AND AAR WITH A CREW -RIG H2S SENARIO-REVIEWED DDI PROCEDURE FOR EMERGENCY RESPONSE& RIG EVACUATION. 06:30 - 09:00 2.50 RIGU P PRE TEST BPV PJSM FOR TESTING THE BPV,VERIFY THE LINE UP AND DISCUSS PRESSURE CROSS CHECKLIST. -PRESSURE TEST 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MIN.-GOOD TEST CONFIRMED NO FLOW. TEST AND CALIBRATE GAS ALARMS, ACTIVATE ESD ON RIG 09:00 - 12:30 3.50 WHSUR P DECOMP NIPPLE DOWN TREE&ADAPTER FLANGE -PJSM FOR ND OPERATIONS-REVIEW DDI PROCEDURE-DISCUSS DROPPED OBJECT PREVENTION PLAN -CLEAN AND INSPECT THREADS(ACME)ON THE TUBING HANGER,INSTALL ISA BLANKING PLUG-6 LEFT HAND TURNS TO MAKE UP -FMC TECH'S FUNCTIONED ALL OF THE LOCK DOWN SCREWS AND GLAND NUTS- TAKE MEASUREMENTS AND POST AT DRILLERS STATION 12:30 - 16:30 4.00 BOPSUR P DECOMP N/U BOPE STACK -PJSM FOR N/U BOPE,DISCUSS LIFTING HAZARDS AND DROPPED OBJECTS. -NU BOPE STACK WITH FOUR PREVENTER CONFIGURATION:ANNULAR,3-1/2 BY 6" VBR'S,BLIND SHEARS,MUD CROSS,3-1/2" BY 6"VBR'S AND 2'SPACER SPOOL. --PJSM FOR MAKING UP CHOKE AND KILL LINES -NU CHOKE LINE AND KILL LINE. -INSTALL NEW LOW PRESSURE RISER INTO THE BELL NIPPLE Printed 10/5/2015 11:03:49AM North America-ALASKA-BP • Page 3 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud DateTme:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor.DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:00 0.50 BOPSUR P DECOMP RIG SERVICE -LUBRICATE RIG 17:00 - 20:00 3.00 BOPSUR P DECOMP RIG UP BOPE TEST EQUIPMENT PJSM FOR TESTING BOPE -FLUID PACKALL THE LINES, -(D1)BOP DRILL,TOOK 6 BBLS TO FILL TEH MUD GAS SEPERATOR -SHELL TEST BOP STACK LOOK FOR VISABLE LEAKS. 20:00 - 00:00 4.00 BOPSUR P DECOMP BOPE TEST -PRESSURE TEST BOPE TO 250 LOW,3500 PSI HIGH FOR 5 MIN EACH -TEST WITH 4"AND 5.5"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST WAIVED WITNESS BYAOGCC REP BOB NOBLE 9/19/2015 00:00 - 02:00 2.00 BOPSUR P DECOMP CONTINUE TEST BOPE -FINISH BOP TEST-NO FAILURES 02:00 - 03:00 1.00 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT - CLEAN AND CLEAR RIG FLOOR,PREP FOR PICKING UP DUTCH RISER 03:00 - 06:00 3.00 BOPSUR P DECOMP •PU MU DUTCH RISER&VALVE SHOP LUBRICATOR WITH QUICK TEST SUB -PJSM FOR DUTCH RISER OPERATIONS& TESTING.-REVIEW PRESSURE CROSS CHECK LIST -PRESSURE TEST THE LUBRICATOR TO 250 LOWAND 3500 HIGH,5 MIN CHARTED- CONFIRMED GOOD LEAK TIGHT TEST -BREAK LUBRICATOR AT THE QUICK TEST SUB -FMC REP DRY ROD OUT THE ISA BLANKING PLUG -MAKE UP LUBRICATOR,TEST QTS AND PULL THE BPV -R/D LUBRICATOR,CLEAN RIG FLOOR -PULL DUTCH RISER AND UD TO PIPE SHED 06:00 - 09:00 3.00 BOPSUR P DECOMP RU CHOKE SKID CIRC LINES -PJSM FOR TESTING CHOKE SKID -TEST CHOKE SKID LINE 250/3500 PSI F/5 MIN EACH—TEST GOOD 09:00 - 16:00 7.00 BOPSUR P DECOMP CIRCULATE OUT FREEZE PROTECT -PJSM FOR MU BAKER SPEAR ASSY/RIH PU 10K OVER TO VERIFY GRAPPLE ENGAGED -PJSM FOR CIRCULATING OUT FREEZE PROTECT FROM WELLBORE -CIRCULATE 68 BBLS 80 DEGREE 8.5 PPG SEAWATER DOWN THE IA;CIRC 5 BPM W/ 1010 PSI AND SWAP LINES -CIRCULATE 180 BBLS 8.5 PPG SEAWATER 80 DEGREE;FCP 1760 PSI AT 5 BPM -10 MINUTE FLOW CHECK-WELL BORE STATIC Printed 10/5/2015 11:03:49AM • North America-ALASKA-BP • Page 4 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Daterme:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor.DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 19:00 3.00 PULL P DECOMP MU/RIH WITH BAKER SPEAR AND GRAPPLE BHA -RIH AND ENGAGE GRAPPLE,PULL 10K OVER TO ENSURE ENGAGED,SLACK OFF 15K, -FMC BOLDS,LDS OUT,PULL ON HANGER TO 170K,STRING BEGAN TO MOVE AT 220K -PU AND SPACE OUT,CLOSE ANNULAR -CIRC SURFACE TO SURFACE THRU MSG SIMOPS-PJSM-BEAVER SLIDE OPS-PICK UP SLB CONTROL LINE SPOOLER AND DOYON CASING EQUIP TO RIG FLOOR -10 MIN FLOW CHECK-WELL BORE STATIC 19:00 - 20:00 1.00 PULL P DECOMP PULL HANGER TO RIG FLOOR AND POOH WITH 5-1/2"TUBING -PJSM WITH BAKER REP AND SLB SPOOLER REP -PULL HANGER TO FLOOR AND TERMINATE CONTROL LINES,REMOVE SPEAR,REMOVE HANGER,BLOW DOWN TOP DRIVE -CHANGE OUT ELEVATORS TO 5-1/2"- VERIFIED BY DRILLER AND LEAD FLOOR HAND 20:00 - 22:30 2.50 PULL P DECOMP POOH WITH 5-1/2"17#AB MOD TUBING W/ CONTROL LINES F/10224' T/8004' -PJSM FOR POOH LAYING DOWN TUBING: DISCUSS HAZARDS OF STEEL BANDS AND CONTROL LINES -PUW-205K 22:30 - 23:00 0.50 PULL P DECOMP LD SUB SURFACE SURFACE SAFETY VALVE& CONTROL LINE SPOOLER. -PJSM FOR BEAVER SLIDED OPERATIONS: DISCUSS POTENTIAL DROPPED OBJECT HAZARDS -CLEAR RIG FLOOR OF SLB TOOL BASKET, SPOOLER AND BAKER SPEAR 23:00 - 00:00 1.00 PULL P DECOMP POOH WITH 5-1/2"TUBING -CONT POOH F/8004' T/7880' PUW=170K SOW=140K @ 7880' -MONITOR TRIP ON TRIP TANK--CORRECT HOLE FILL OBSERVED. 9/20/2015 00:00 - 00:30 0.50 PULL P DECOMP RIG SERVICE -GREASE RIG,INSPECT DRAWWORKS,TOP DRIVE,POWER TONGS 00:30 - 05:00 4.50 PULL P DECOMP PULL AND LAY DOWN 5-1/2"#17 L-80 8RD AB MOD COMPLETION -PJSM FOR LAYING DOWN TUBING,REVIEW DDI PROCEDURE,DISCUSS AND AGREE ON DISPLACEMENT VOLUMES TO BE USED FOR TRIP SHEETS. -POOH F/7880' T/2093' D1 WELL CONTROL DRILL -1:50 WELL SECURE TIME -AAR WITH WSLAND TOUR PUSHER 05:00 - 06:30 1.50 PULL P DECOMP CONT POOH VVITH 5-1/2"COMPLETION TUBING -POOH AND LD COMPLETION TUBING F/2093' TO SURFACE -251 JTS,1 SSSV,10 GLM'S,CUT JT 3.33, MAX OD FLARE 6-1/8" Printed 10/5/2015 11:03:49AM • North America-ALASKA-BP • Page 5 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) - (usft) 06:30 - 09:00 2.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -RD POWER TONGS,5-1/2"HANDLING EQUIPMENT,REMOVE 5-1/2"SAFETY JT, MOBILIZE BAKER DRESS OFF BHA 09:00 - 10:30 1.50 PULL P DECOMP INSTALL WEAR BUSHING -PJSM WITH FMC REPS FOR INSTALLING WEAR BUSHING, INSTALL 8-11/16"ID WEAR BUSHING -FMC RILDS 10:30 - 13:30 3.00 PULL P DECOMP PU/MU BAKER DRESS OFF ASSY -PJSM WITH BAKER REPS FOR MU OF DRESS OFF BHA -MU BOT DRESS OFF BHA.MU FIRST JOINT DRILL PIPE AND RIH 13:30 - 14:00 0.50 PULL P DECOMP SERVICE RIG -SERVICE TOP DRIVE,DRAWWORKS,SKATE 14:00 - 20:00 6.00 PULL P DECOMP RIH WITH DRESS OFF BHA -CONT SINGLING IN F/238'T/6122' -KICK WHILE TRIPPING DRILL WITH AAR WITH TOURPUSHER 20:00 - 00:00 4.00 PULL P DECOMP CONT RIH WITH DRESS OFF BHA -ON 4"XT39 DP SINGLES FROM 6,122'TO 10012' MONITOR TRIP ON THE TRIP TANK- CORRECT DISPLACEMENT OBSERVED 9/21/2015 00:00 - 01:00 1.00 PULL P DECOMP CONT PU RIH 4"DP SINGLES FROM SHED AND RIH -RIH WITH 4"DP SINGLES F/10,012'T/10,202 01:00 - 03:00 2.00 PULL P DECOMP SLIP AND CUT DRILL LINE -SLIP AND CUT 60'DRILL LINE -SERVICE TOP DRIVE -PRE JAR DERRICK INSPECTION 03:00 - 04:00 1.00 PULL P DECOMP MAKE UP DOUBLE AND RIH -OBTAIN PARAMETERS PUW=225K SOW= 150K ROT=182K 30RPM 7K FREE TORQUE -RIH WITH 4"DP F/ 10,202'TO 10,224' -OBTAIN SPR'S AT 10,202' 04:00 - 05:00 1.00 PULL P DECOMP DRESS OFF STUB AND JAR OUT WRP SEAL ASSY -PJSM WITH BOT REP AND CREW. -DRESS OFF TBG STUB WITH 30 RPM,175 GPM 420 PSI -ENGAGED TUBING STUB WITH OVERSHOT VERIFY WITH 10 K DOWN AND PRESSURE INCREASE,PULL 10 K OVER TO VERIFY -PJSM FOR JARRING OPERTIONS: -JARR SEAL BORE FREE WITH 175K OVER, WELL WENT ON LOSS(PULLED FREE AFTER 10 JARS) -SHUT THE ANNULAR AND BULLHEAD 50 BBLS AT 8.5 BPM,ICP-890 PSI,FCP-1130 PSI ,CAUGHT PRESSURE AT 18 BBLS AWAY -8.5 PPG SEAWATER -MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM.-WELL STABLE Printed 10/5/2015 11:03:49AM •North America-ALASKA-BP Page 6 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011 FL-E:(1,680.000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. I UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 13:30 8.50 PULL P DECOMP POOH WITH DRESS OFF ASSY ON 4"DP FROM 10,222'TO 270'LAYING DOWN PIPE TO THE SHED -PJSM FOR POOH LD DP -POOH LDDP F/10,222'T/270', -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH THE STACK-WELL STABLE LD BOT DRESS OFF BHA -CONTINUOUS HOLE FILL AT 30 BPH,WITH 8.5 PPG SEAWATER. 13:30 - 19:30 6.00 PULL P DECOMP LAY DOWN DRESS OFF BHAAND 5-1/2"STUB WITH SEAL ASSEMBLY -PJSM FOR LAYING DOWN BHA WITH BOT REPAND DDI -LD COLLARS,PULL OUT TO SEAL ASSY AND PUP.PU TUBING PUNCH,BREAK SEAL ASSY BETWEEN CUT JOINT AND THE PUP, -UNABLE TO BREAK CUT JOINT FROM OVERSHOT, -CUT 5-1/2"TUBING WITH HAND CUTTER,LD REST OF THE SEAL ASSY AND BOT BHA. OBSERVED LARGE VOLUME OF FORMATION SAND IN THE SEAL ASSY FISH. 19:30 - 22:00 2.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -PJSM FOR BEAVER SLIDE OPERATIONS -CLEAR BOT TOOLS, -PU DDI CASING TOOLS TO THE RIG FLOOR AND START RIGGING UP TO RUN 4-1/2" TUBING -REMOVE WEAR RING -MAINTAIN CONTINUOUS HOLE FILL AT 30 BPH WITH 8.5 PPG SEAWATER. 22:00 - 00:00 2.00 RUNCOM P RUNCMP RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION TO 387'MD -PUVV-60K,SOW-60K -BAKER-LOC ALL CONNECTIONS BELOW THE PACKER -TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -90 FPM MAX RUNNING SPEED -CONTINUOUS HOLE FILL AT 30 BPH WITH 8.5 PPG SEAWATER 9/22/2015 00:00 - 06:30 6.50 RUNCOM P RUNCMP RUN 4 1/2",12.6#/FT,13Cr-85 VAMTOP COMPLETION FROM 387'MD TO 4,695'MD -TORQUE TURN ALL CONNECTIONS. -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS. -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -CONTINUOUS HOLE FILL AT30 BPH WITH 8.5 PPG SEAWATER. KICK WHILE TRIPPING DRILL -SECURE WELL 1:34 SEC. -AFTER ACTION REVIEW Printed 10/5/2015 11:03:49AM • North America-ALASKA-BP • Page 7 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 12:00 5.50 RUNCOM P RUNCMP CONTINUE RUNNING 41/2",12.6#/FT, 13Cr-85 VAMTOP COMPLETION FROM 4,695' MD TO 9,660'MD -PUW 152K,SOW 128K. 12:00 - 17:00 5.00 RUNCOM P RUNCMP CONTINUE RUNNING 4 1/2",12.6#/FT, 13Cr-85 VAMTOP COMPLETION FROM 9,660' MD TO 10,284'MD TORQUE TURN ALL CONNECTIONS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -SPACE OUT GLM'S AS PER TALLY. -MAKE-UP TORQUE FOR 4 1/2"VAMTOP CONNECTIONS-4440 FT-LBS. -FEED THE WELL AT 30 BPH DOWN THE BACKSIDE. -NO-GO AT BOTTOM OF PBR AT 10,284'WITH 2K DOWN AND RE-CONFIRM AFTER PICKING UP 20'. SPACE OUT AND LAND 4-1/2",12.6#,VAMTOP COMPLETION: -PICK UP 4.08'PUP JOINT,HANGER& HANGER PUP (FMC 12"X 4.5"TCII TOP AND BTM). -PJSM WITH FMC REPS RUN IN HOLE ON 4"DP LANDING JOINT CROSSED OVER AND LAND TUBING HANGER WITH WLEG AT 10,279'. -FMC REPS RUN IN LOCKDOWN SCREWS. -FINAL PICKUP WEIGHT=160 K,SLACKOFF= 132 K -HES AHC PACKER AT 10,183'MD. -'X'NIPPLE AT 10,221'MD HAS RHC-M PLUG INSTALLED. -NOTE:ALL CONNECTIONS BELOW PACKER ARE BAKER-LOK'D. 17:00 - 21:00 4.00 RUNCOM P RUNCMP PJSM FOR PUMPING CORROSION INHIBITED SEAWATER LINE UP AND BULLHEAD 290 BBLS OF CORROSION INHITBITED SEAWATER DOWN IA -2 BPM-80 PSI -3 BPM-500 PSI -4 BPM-650 PSI -CAUGHT FLUD AT 19 BBLS AWAY, PRESSURE INCREASED OVER 1100 PSI, SLOWED PUMPS TO 3 BPM,WITH 1080 PSI -BULLHEADED TOTAL OF 88 BBLS AWAY -SHUT DOWN AND MONITOR WELL 10 MIN- FLUID LEVEL DROPPING -CONTINUED REVERSE CIRCULATING THE REST OF THE CORROSION INHIBITED SEAWATER AT 4 BPM,WITH 500-550 PSI TAKING RETURNS BACK TO PITS -SHUT DOWN AND PUMP 5 BBLS-DOWN THE TUBING TO FLUSH SEAT FOR BALL AND ROD -TOTAL 550 BBLS PUMPED -DROP BALL AND ROD-1-7/8"STANDARD BALL AND ROD -REMOVE LANDING JOINT,RU EQUIPMENT TO SET THE PACKER Printed 10/5/2015 11:03:49AM North America-ALASKA-BP Page Sof 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 RUNCOM P RUNCMP PJSM FOR SETTING THE PACKER -PJSM FOR SETTING PACKER -SET PACKER AS DIRECTED BY HALLIBURTON REP -PRESSURE UP TO 250 PSI FOR 5 MIN, BRING PRESSURE UP,PACKER SETAT 2000 PSI,CONTINUE TO 3750 PSI FOR HIGH PRESSURE TEST FOR 30 MIN. -REDUCE PSI ON THE TUBING TO 2000 PSI. -PRESSURE TEST THE IA.250 PSI LOW,5 MIN 3800 PSI FOR 30 MIN-ALL TESTS PASS BPXA PRESSURE TESTING CRITERIA CALCULATOR. -RECIEVE ATP FROM RWO WTL. -BLEED TBG DOWN TO SHEAR DCK VALVE, OBSERVED CONFIRMATION OF SHEAR ON TEST CHART. 9/23/2015 00:00 - 01:30 1.50 RUNCOM P RUNCMP CONFIRM GOOD SHEAR ON DCR VALVE. -PJSM WITH CREW COMING ON TOUR ON PUMPING DOWN TUBING AND ANNULUS. -VERIFY LINE UP OF CIRCULATING LINES. -PUMP 5 BBLS DOWN ANNULUS TAKING RETURNS TO PITS AT 3 BPM W/200 PSI. -SWAP VALVE ALIGNMENT AND VERIFY. -PUMP 5 BBLS DOWN TUBING TAKING RETURNS TO PITS AT 3 BPM W/160 PSI. -CONFIRM GOOD SHEAR. 01:30 - 04:30 3.00 WHSUR P OTHCMP FREEZE PROTECT WELL -PJSM WITH LITTLE RED AND RIG CREW, REVIEW PRESSURE CROSSCHECK -PT LINES -RIG UP LINES THROUGH LANDING JOINT AND CHOKE SKID FOR DIESEL PUMPING AND U-TUBE -LRS TEST LINES 300 PSI LOWAND 3900 PSI HIGH -REVERSE CIRCULATE 150 BBLS DIESEL -LRS PUMP AT 4 BPM AND 1500 PSI -OPEN CHOKE SKID VALVES TO ALLOW DIESEL TO U-TUBE ONE HOUR 04:30 - 06:30 2.00 WHSUR P OTHCMP SET AND TEST TWO WAY CHECK. -PJSM FOR SETTING TWC-REVIEW DDI PROCEDURE AND DISCUSS CAMERON PROCEDURE PRIOR TO PERFORMING TASK -REVIEW HAZARDS OUTLINED IN FMC HAZARDS ASSESMENT.DISCUSS POTENTIAL FOR DROPPED HAZARDS. -VOID STACK OF RESIDUAL FREEZE PROTECT. -FMC REP DRY ROD IN TWC. -PRESSURE TEST FROM BELOW 250 PSI LOWAND 3500 PSI HIGH FOR 5 CHARTED MIN. -PASSING TEST -PUMP 6.1 BBLS TO PRESS UP FOR HIGH PT (CALC 6 BBLS). Printed 10/5/2015 11:03:49AM • North America-ALASKA-BP • Page 9 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:WORKOVER(WO) Start Date:9/16/2015 End Date:9/23/2015 X4-011 FL-E:(1,680,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:DOYON 14 Spud Date/Time:4/13/1982 12:00:00AM Rig Release:9/23/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292078100 Active datum:02-21 @64.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 08:30 2.00 BOPSUR P OTHCMP RD FROM PRESSURE TESTING. -BLOW DOWN CHOKE/KILL/BLEEDER LINES. -BLOW DOWN MUD PUMPS LINES AND CIRC LINES IN CELLAR -PJSM FOR ND OPERATIONS BLOW DOWN CHOKE&KILL LINES,DRAIN THE STACK.REMOVE RISER -ND SPACER SPOOL&SET STACK BACK& SECURE -BARRIERS IN PLACE FOR ND, BALL AND ROD ON SEAT WITH KWF,AND TESTED TWC. 08:30 - 10:30 2.00 BOPSUR P OTHCMP CHANGE OUT UPPER RAMS -PJSM FOR RAM C/O -INSTALL 9-5/8"FIXED BORE RAMS 10:30 - 13:30 3.00 BOPSUR P OTHCMP NIPPLE DOWN BOPE -PJSM FOR ND OPERATIONS -SET BACK BOP,RD SPACER SPOOL 13:30 - 19:00 5.50 WHSUR P OTHCMP PJSM AND INSTALL ADAPTER FLANGE AND DRY HOLE TREE. -INSTALL 11"5K x 4-1/16" ADADPTER FLANGE AND 4-1/16"TREE. -PRESS TEST HANGER VOID TO 250/5000 PSI FOR 5/30 MIN-GOOD TEST. -SIMOPS:PREP RIG FLOOR FOR MOVE. CLEAN DRIP PAN AND IN PIPE SHED. PRESSURE TEST TREE,250 LOW,3500 PSI HIGH-LEAK TIGHT-SECURE WELL CELLAR RIG RELEASE: -RELEASE DOYON 14 RIG AND END WO EVENT AT 19:00 ON 09/23/2015. -PREP RIG TO MOVE TO DS 011-22. -ALL TREE AND WELLHEAD VALVES LEFT CLOSED WITH PRESSURE GAUGES. -FINAL OA/IA/TPRESS=0/0/0 PSI. -TREE,WELLHEAD,AND CELLAR CLEAN. WELL SIGN RETURNED TO OPERATIONS. Printed 10/5/2015 11:03:49AM TREE=6 CAN WI3LHEAD FMC .z ...SeTY NOTES: WELL ANGLE<70°@ 11555' ACTUATOR BAKER C CHROME TBG" ** OKB.ELEV- 64' I 1: BF BEV= ? / KOP= 2900' 20"CONDUCTOR, --i ? ' ' 2212' H4-1/2"HES X NP,D=3.813" Max Angle= 100°013460' 91.5#,H-40. Datum MD= 11263' ID=19.124" Datum TVD 8800'SS GAS LFTMAMDRELS 13-318"CsG,72#,L-80 BTC, 0 12.347" -{ 2537' ST MD ND DEV TYPE VLV LATCH PORT DATE 4 3777 3726 28 MMG MY RK 0 09/22/15 9-5/8"CSG,47#,L-80 BTC XO TO S00-95 BTC -{ 9578' X x 3 6676 5713 50 /MG oMY RK 0 09/22/15 2 8665 7002 46 MMG DIN RK 0 09/22/15 1 10032 8009 41 MAG DCR RKP - 09/22/15 Minimum ID =2.377" @ 11759' ' ' . 10154' H4-1/2"HES xMP,D=3.813" 3-3/16" X 2-7/8" XO x 10184' -19-5/8"X 4-1/2"AHC PKR,D=3.903" ' I 10222' H4-1/2"HES X MP,D=3.813" 10266' -15-112"BAKER PBR ASSY,D=? 10280' -i4-1/2'WLEG,D=3.958" 4-1/2"TBG,12.6#,13CR-85 VAM TOP HC, -1 10280° / ` .0152 bpf,D=3.958"" 10282' 3.70'BKR DEPLOY SLV,D=3.00" 10282' -19-518"X 5-1/2"BKR SAB PKR D=4.012" 10287' H 7"WIL LOUT EXTENSION,ID=?" 10293' -15-1/2"X 4-1/2"XO.D=3.958" I 10305' -I 3-1/2"OTIS X NP,0=2.813" TOP OF 7'LNR H 10317' 1- 10317' H 9-5/8"X 7"BKR HGR w/TRK SLV 3-1/2"LNC,9.2#,L-80 STL,.0087 bpf,0=2.992" -1 10337' ' 10337' -{3-112"X 3-3/16"XO,D=2.786" 4-1/2"TBG-PC,12.6#,N-80 BUTT, H 10366' I ' -------------- 10353' -i4-1i2"CAM DB-6 LANDING NR D=3,813" .0152 bpf,D=3.958" 10364' -j4 1t2"BKR St EAROur SUB BEHIND 9-5/8"CSG,47#,S00-95 BUTT, D=8.681" -{ 10592' pil & 10366' H4-1/2"TUBING TAL,ID=3.958' CT LNR 10374' HEM)TT LOGGED 05/05/82 7"LNR 29#,L-80 BUTT,.0371 bpf,D=6.184" -10817 7"BK32 GEN i WHPSTOCK(04!30111) -1 10858' ••. •• MLLOUT WINDOW(02-21B) 10858'-10872' • • PERFORATION SLI ARY � M • � REF LOG:SLB NEM GR/CNL ON 5/13/11 A' ANGLE AT TOP PERF: 90°©12900' Note:Refer to Production DB for historical pert data I 11759' -13-3/16"X 2-7/8"XO,D=2.377" SCE SPE NTERVAL Opn/Sqz SHOT SQZ l 2" 6 12900-13330 0 05/15/11 I 2" 6 13720-14092 0 05/15/11 I 3-3/16"LNR,6.2#,L-80 TCI,.0076 bpf,0=2.800" H I 11759' 14098' H PBTD s'l .4 2-7/8"LW,6.4#,L-80 STL,.0058 bpf,ID=2.441" H '14138' 4' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY U1\1(- 05/02/82 1\T05/02/82 ORIGINAL COMPLETION 09/29/15 CK/JMD MAL ODE APPROVAL WELL: 02-21B - 06/11/01 N3ES CTD SIDETRACK(02-21A) FERMT No: 2110330 05/17/11 NORDIC i CTD SIDETRACK(02-21 B) AR No: 50-029-20781-02 09/23/15 D-14 IVO SEC 36,T11N,R14E,2513'FNL&102'FWL 09/23/15 JMD LFDA I ED DRAFT PER RIG TALLY _ 09/28/15 JMD DRLG HO CORRECTIONS BP Exploration(Alaska) • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Saturday, September 26, 2015 8:06 AM To: AK, OPS FS1 OSM; AK, OPS FS1 Facility OTL; AK, OPS FS1 Field OTL;AK, OPS FS1 DS Ops Lead; AK, OPS PCC EOC TL; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS EOC Specialists; AK, OPS Prod Controllers; G GPB FS1 Drillsites; Warner, Scott;Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA) Subject: OPERABLE: Producer 02-21B (PTD #2110330) Rig Workover Complete - MIT-IA Passed All, Producer 02-21B (PTD#2110330) underwent a rig workover completed on September 23, 2015 to replace the tubing and repaired the tubing x inner annulus communication. A MIT-T and MIT-IA both passed to 3500 psi on September 22, 2015. The passing tests confirm two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • Annuli are fluid packed • A SSSV is not required Please use caution while placing the well on production due to fluid packed annuli and the potential for annular fluid expansion. Please call with any questions or concerns. Thank you, Kevin Parks (Alternate: Whitney Pettus) �1 I 201 BP Alaska-Well Integrity Coordinator SC ANNE) u I 1WGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, August 17, 2014 8:06 AM To: AK, OPS PCC EOC TL; AK, OPS Prod Controllers; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; G GPB FS1 Drillsites; AK, OPS FS1,DS�2 Operator; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Daniel, Ryan; Cismoskr, Doug A; Youssef, Menna M; AK, OPS FS1 DS Ops Lead; 'chris.wallace@alaska.gov'; AK, OPS FS1 OSM; AK, OPS1 Facility OTL Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, D&C Well Integrity Coordinator; 'jim.regg@alaska.gov'; AK, OPS FF Well Ops Comp Rep Subject: NOT OPERABLE: Producer 02-21B (PTD #2110330) MIT-IA Failed All, 1 oTo o .� c rn m r. o 2 o 0 cu Z —°w CO CO O U y Z NZ O 2 v c Z ° E= .L aa)U c aO O N 0 u) _.v) OI, IT J -0 IO y 0 cc = J m L U N0. N m co o C7 D Ud a o 2U C7 c � Z U 0 p 0 O a -o X a£i N W 0 w cn F. is 2 2 2 2 2 1 � Z_wi �vap. as dc 'c > o O ,- a a) o 0 0 0 0 0 0 J N Cl) V N N N N N N N N N C) p Q cu LO t0 LO LO CO CO N N j ? J CO 00 CO CO CO n n 00 CO C I 2 — c c c c c c c c c E 2 2 a) a) a) a) a) a) a) a) a) Co c a a a a a a a a a E .cc �, ° U 0 0 0 0 0 0 0 0 0 Ce Y Q co Z cc (C) CO 00 Tr Tr N CO CO O 0 1 d 0 1.7E a O �j f6ov : ; ; ; v vv a Np o 0 0 Li a — N o 0 0 0 0 o") 0 0 o C'-. W W J d a) � a)U m o Q I cp u ao � re z o u) 0 1 CL 0 ZI 3 2 0 0 0 N o N r _ N a) w a) O C a. E 1 p, O o N to N LO N Uco � 0 E -JV) J m (/) QN J N r F U o Z J co 5 G ' N0 CO >-Q n 0 d m t 11 0CC c fli to 0)) D 1 U' o ! 0Q 0 a0iI— )aIIZI ' >. .wQ 6 Io D > > >_ a)6)Qa) U o) 0 a m � w) RI J 0) N >. >. N CA V) Z 7 EC CL LL LL CC C C d d O O co co 0 O O c0 E 0 i 1 O Z o V N N 'O �_ �_ a) a) O CA N b6Z Z_> ! O~ IdEEoo l N >- N 2 Q 3 O woz ayi O Q `o co n LL O E E E E Z F. v z g w H N is m J a) 6 03 — S. — 0 O O v c °_) o J < J rn z Z -o a)) �. Tr ce z W J G 0 U \ 0 p O `o x .0 m m 0 w Q a. m O)2 a o 0 0 0 p a o 0 m 0 - r c aa)) ll Ce Ca J CO I- H J J J J W W R J W Q > 0 Q 2' 0 0 N 9 O r Z NIli d) U_ N 5 I 0 0 zim E. Q J UO z To co co Ce Q E N pZ CL ° U IX ° J a LU W J Z0. o < co Y N o I 11. 2o a O 5-%-1 p O E U � 0 J m Q N N I—.LO I—L I— E o C >- N C Q m m 1 0 a) CO o 0 Q a g a, 1 Q o a o CI if) U m BIZ z d oO m o M0 m c - C 3 N d > 0 R' V w r' C l64 d r E 1 O. E 41 a M O j v O M 0 M > > N4 > 8mT ; 1g26 mo ma zb. . 0 CD v2. a › m yaym 2g. ° D 310 g - m 0,.. Z N a)W A 6 w N A x y 1M i . 00s >0.0>>>w 0 e9 � a o 01T, No _. w y w 7 14E F4eS gipm w AO' m o y A w v m;00p O W D>r GC) y 6D,'p�CC4A Cm D O OO c , 0, 666666666 0 000000aN _ _ 0 z VAVmWm m-, Z 2 O 000000000 Z 000000000 0m 000000000 1 A 000000000 z 3A3mm333m 2 00C)000C)00 G) z1z'ilzzz'' 0 r r rrr z 0 m m 0 0 0 N g. O O Z 1 0 hi,,.W• rN p, A m m C 00 m C d 9 m N •G 7 —K rya 0 r D th D o Z o 0y c ro m so m0 N P 3 m g w >0703.0) D mNo 0 g*- E m R (J ^0c mw?�D - m9'I -Ia _ ° NCy OD ': Cm.qyN W OM MMO 3 NJ A C N ..-- ..- c, 0I- Letter of Transmittal BAKER Date: � July 1, 2011 HUGHES To: f From: ( State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 ! Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): C-42A E-23CPB1 E-23CPB2 E-23C E-19C 02-21B 2\1-033 15-48C 15-05BPB 1 15-05B Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: 't 0 , State of Alaska AOGCC DATE: STATE OF ALASKA •• ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ® Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25.105 2OAAC 25.110 CO Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,orAband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 5/17/2011 „ 211-033 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 5/2/2011 50-029-20781-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 5/10/2011 PBU 02-21 B 2153'FNL,5178'FEL, SEC.36,T11 N, R14E, UM 8. KB(ft above MSL): 00 Pool(s): Top of Productive Horizon: 15.Field/ 797'FNL,979'FEL,SEC. 1,T1ON, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): �! Oil Pool 3564'FNL, 821'FEL,SEC. 1,T10, R14E, UM 14098' 9041' f i 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth( �" )X91 P ty Ignation: Surface: x- 686884 y- 5949029 Zone- ASP4 14184'•s� o' -01; 028308&028311 TPI: x- 691181 y- 5945212 Zone- ASP4 11.SSSV Depth(MD+TVD): (g,ft 17. Land Use Permit: Total Depth:x- 691410 - 5942451 Zone- ASP4 None �¢tjgl�g,, If- - 19.Water depth,if offshore: CA�tif� 20 ess of Permafrost(TVD): 18.Directional Survey: ®Yes ❑No a6 (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL SLOQ 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-DrilULateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/CNL 10859' 8613' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 80' Surface 80' 30" 520 sx Arcticset II 13-3/8" 72# L-80 Surface 2537' Surface 2537' 17-1/2" 220 sx Fondu.400 sx Permafrost'C' 9-5/8" 47# ,L-80/SOO-95 Surface 10597' Surface 8427' 12-1/4" 500 sx Class'G' 7" 29# L-80 10317' 10859' 8223' 8613' 8-1/2" 425 sx Class'G' 3-1/2"x 3-3/16" 9.2#/6.2# L-80 10282' 14138' 8197' 9041' 3-3/4" 150 sx Class'G' x 2-7/8" /6.4# 24. Open to production or injection? ® Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET (MD+TVD of Top&Bottom;Perforation Size and Number): (MD/ND) 2"Gun Diameter,6 spf 5-1/2",17#, L-80 x 10293' 10282'/8197' MD ND MD TVD 4-1/2", 12.6#, L-80 10293'-10366' 12900'-13330' 9049'-9040' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 13720'-14092' 9028'-9041' losi. q•, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED Zone 2 '' ; 2500' Freeze Protected w/58 Bbls of Diesel 1 -S, 'si11 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): May 29,2011 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 5/30/2011 8 Test Period ♦ 1,775 3,668 67 88 2,066 • Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 230 1,750 24-Hour Rate ♦ 5,326 11,005 200 Not Available 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS MAY 13 1011 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE G , 3 /I' Submit Original Only 'OW / G 29. GEOLOGIC MARKERS(List all formations and marts icountered): 30. 110vIATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25.071. Top CGL/Zone 3 11088' 8760' None Base CGL/Zone 2C 11189' 8824' 23SB/Zone 2B 11363' 8916' 22TS 11427' 8950' 21 TS/Zone 2A 11527' 8999' Formation at Total Depth(Name): 22TS(Entered from Base of Zone) 13300' 9043' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoin is true and correct to the best of my knowledge. NN� lJ� Signed: Terrie Hubble (,Q,� Title: Drilling Technologist Date: /It PBU 02-21 B 211-033 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Cody Rymut, 564-5452 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America-ALASKA- BP Page 1 of 18 Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/26/2011 15:00 - 19:00 4.00 MOB P PRE MOVE RIG OFF OF WELL 2-12C. HOLD PJSM AND MOVE RIG TO PAD IN FRONT OF WELL 2-21 B. 19:00 - 00:00 5.00 MOB N WAIT PRE STANDBY FOR SRT TO ADDRESS LEAK BEHIND WELL 2-21 B THAT WAS DISCOVERED BY WSL DURING PRE-RIG SITE INSPECTION. PERFORM LIGHT MAINTENANCE ON RIG. CONTINUE TO MOBILIZE EQUIPMENT FROM AROUND 2-12C TO PAD NEAR 2-21 B. SLB RU INJECTOR FOR 2-3/8"COIL SRT BEGIN THAWING GROUND AROUND WELLHEAD TO DELINIATE SPILL BOUNDARY. 4/27/2011 00:00 - 04:30 4.50 MOB N WAIT PRE STANDBY FOR SRT TO ADDRESS LEAK BEHIND WELL 2-21 B THAT WAS DISCOVERED BY WSL DURING PRE-RIG SITE INSPECTION. SIGN OFF WWT PERMIT FOR 2-12C AND REMOVE LOCKS FROM WELLS THAT WERE LOCKED OUT FOR THAT WORK. CONTINUE TO MOBILIZE EQUIPMENT AREA NEAR 2-21. SPOT SATELLITE CAMP. 04:30 - 05:15 0.75 MOB N WAIT PRE HOLD PJSM WITH SRT AND SUPERSUCKER DRIVER. DISCUSS THEIR OPERATION, PROPER PPE AND COMMUNICATION BETWEEN SRT AND RIG. SRT REMOVES —2-YARDS OF DIESEL CONTAMINATED GRAVEL USING SUPER SUCKER AND DECLARES AREA CLEAN. 05:15 - 06:00 0.75 MOB P PRE HOLD RIG EVACUATION DRILL WITH RIG CREW-NO EXTRA PERSONNEL ON LOCATION. HOLD AAR ONCE CREW HAD MUSTERED- CREW RESPONDED QUICKLY AND COMPLETELY. ALL WERE REMINDED THAT THE BEST WAY TO EXIT THE RIG FROM AN UPPER LEVEL IS TO EXIT THE RIG TO FRESH AIR FIRST AND THEN DESCEND TO THE GROUND. IT WAS NOTED THAT NO NOTIFICATION WAS MADE TO THE RIG HARMONY HUB AS NO EXTRA PERSONNEL WERE ON LOCATION- ALL PERSONNEL AGREED THAT A HARMONY ANNOUNCEMENT SHOULD BE MADE REGARDLESS OF EXTRA PERSONNEL ON LOCATION. 06:00 - 08:00 2.00 MOB P PRE PREP WELL FOR MOVING RIG OVER. LAY DOWN HANDI-BERM AND RIG MATS. 08:00 - 08:30 0.50 MOB P PRE PJSM FOR MOVING RIG OVER WELL. DISCUSS SPOTTER POSITIONS AND GO THROUGH RIG MOVE CHECKLIST. 08:30 - 14:50 6.33 MOB P PRE MOVE RIG OVER WELL AND SET RIG DOWN. ACCEPT RIG AT 1000-HRS ON 4/27/2011. START RIGGING UP BOPS AND LUBRICATOR. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 2 of 18 Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:50 - 15:10 0.33 MOB P PRE RIG EVACUATION EXERCISE. ALL PERSONNEL MUSTER IN OFFICE TRAILER AND ARE ACCOUNTED FOR IN 2 MIN. NO EXTRA PERSONNEL ON LOCATION AT THE TIME OF THE DRILL. CONDUCT AAR AFTERWARDS AND DOCUMENT LESSONS LEARNED. 15:10 - 15:30 0.33 MOB P PRE CONTINUE RIGGING UP LUBRICATOR SECTIONS. 15:30 - 17:55 2.42 MOB P PRE PJSM FOR RIGGING UP STRIPPER TO INJECTOR. INSTALL STRIPPER ON INJECTOR. 17:55 - 18:25 0.50 MOB P PRE PJSM FOR STABBING COILED TUBING INTO INJECTOR. PULL TEST GRAPPLE.-GOOD TEST. 18:25 - 19:30 1.08 MOB P PRE PJSM WITH INCOMING CREW. PULL COIL TO INJECTOR HEAD AND STAB INTO INJECTOR. 19:30 - 21:15 1.75 MOB P PRE PJSM ON PREPPING COIL. CUT COIL UNTIL E LINE EXPOSED. INSTALL NEW ELINE BOOT AND DRESS COIL FOR CONNECTOR. SET INJECTOR BACK IN CIRCULATION HOLE. GREASE CREW SERVICE TREE. WELLS SUPPORT RU HARDLINE AND TEST TO 4000-PSI. GOOD TEST. 21:15 - 22:30 1.25 MOB P PRE PUMP 10-BBLS OF MEOH FOLLOWED BY 8.4-PPG 2%KCL TO FILL COIL. CIRCULATE AT 1-BPM WITH 400-PSI. DIVERT METHANOL RETURNS TO CUTTINGS BOX. REDUCE CIRCULATION RATE TO.4-BPM WITH 150-PSI. 22:30 - 00:00 1.50 BOPSUR P PRE PJSM ON FUNCTION&SHELL TESTING BOPE. TAKE RKB MEASUREMENTS. FUNCTION TEST BOPE-NO ISSUE. FILL BOP STACK WITH WATER. 4/28/2011 00:00 - 01:00 1.00 BOPSUR P PRE FINISH FILLING BOP STACK WITH FRESH, WATER. PERFORM SHELL TEST TO 250-PSI LOW AND 3500-PSI HIGH. HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TESTS. 01:00 - 08:30 7.50 BOPSUR P PRE HOLD PJSM ON INITIAL BOPE TEST. PERFORM INITIAL BOPE TEST. ALL TESTS TO 250-PSI LOW AND 3500-PSI HIGH. P\ HOLD AND CHART EACH TEST FOR 5-MINUTES. AOGCC REP CHUCK SCHEVE WAIVED STATE'S RIGHT TO WITNESS BOPE TEST AT 1815-HRS ON 4/27/2011. ALL TESTS WITNESSED BY BP WSL AND NORDIC TOOLPUSHER. 08:30 - 09:30 1.00 BOPSUR P PRE PT BAKER CHECK VALVES TO 250/2500 PSI AT SURFACE AND CHART,GOOD TEST. FILL GAS BUSTER U-TUBE WITH FRESH WATER UNTIL WATER IS SEEN AT PITS TO VERIFY ITS CLEAR. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 3 of 18 Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 11:00 1.50 BOPSUR P PRE PJSM FOR PT INNER REEL VALVE AND PACKOFF. PICK UP INJECTOR AND M/U CT CONNECTOR. PULL TEST CT CONNECTOR TO 35K, PT TO 250/3750 PSI,GOOD. 11:00 - 11:30 0.50 BOPSUR P PRE M/U CT RISER TO WELL. TEST INNER REEL VALVE AND CT STRIPPER TO 300/3500 PSI, GOOD. 11:30 - 13:00 1.50 BOPSUR P PRE DROP 3/4 DRIFT BALL AND PUMP IT THROUGH REEL. BALL IS HEARD ROLLING,LEAVES REEL HOUSE AT 57.8 BBLS. LIFT UP INJECTOR AND REMOVE NOZZLE, RECOVER 3/4"BALL. PUT INJECTOR BACK IN CIRC HOLE. 13:00 - 13:20 0.33 BOPSUR P WEXIT BPV CREW ARRIVES,SPOT TRAILER AND PREP TO BRING BPV LUBRICATOR ABOARD. 13:20 - 13:30 0.17 BOPSUR P WEXIT PJSM WITH BPV CREW TO DISCUSS PT AND BARRIER REQUIREMENTS. 13:30 - 17:00 3.50 BOPSUR P WEXIT LIFT BPV LUBRICATOR UP AND M/U TO CT RISER. PT TO 250/3500 PSI,GOOD. PULL BPV, NO PRESSURE UNDERNEATH. CHECK TREE BOLTS FOR TORQUE,ALL ARE GOOD. 17:00 - 18:40 1.67 FISH P WEXIT MU BHA#1 FOR FISHING LINER. PU INJECTOR HEAD AND MU COIL TO BHA. STAB ON INJECTOR HEAD. 18:40 - 21:00 2.33 FISH P WEXIT HOLD PJSM ON RIH WITH BHA#1. RIH WITH BHA#1 AT 80-FPM TO 10000'. CIRCULATE AT MIN RATE, DISPLACING DIESEL FREEZE PROTECTION. 21:00 - 21:20 0.33 FISH P WEXIT WEIGHT CHECK AT 10000'WITH PIPE MOVING AT 20-FPM. PU WT=43K-LBS,SO WT=22K-LBS CONTINUE TO RIH TO 10200'. 21:20 - 23:30 2.17 FISH P WEXIT CIRCULATE 1.5X BU AT 2.5-BPM WITH 2500-PSI. FINAL 80-BBLS PUMP 8.4-PPG 2%KCL WITH SAFE SURF O. OBTAIN SLOW PUMP RATES-PUMP 1: 1-BPM =420-PSI,2-BPM= 1640-PSI. PUMP 2: 1-BPM =430-PSI,2-BPM= 1630-PSI. FLOW CHECK WELL-STATIC. 23:30 - 00:00 0.50 FISH P WEXIT CONTINUE TO RIH AT 10-FPM CIRCULATING AT.3-BPM WITH 30-PSI. TAG FISH AT 10322'UNCORRECTED. SHUT DOWN CIRCULATION. PU TO 50K-LBS AND SEE WEIGHT BREAK OVER. CONTINUE TO PULL UP HOLE AT 50K-LBS. RBIH AND SET DOWN 2K-LBS BRING PUMP BACK UP TO 2-BPM WITH 1730-PSI AND PUMP 35-ADDITIONAL BBLS OF 8.4-PPG 2%KCL WITH SAFE SURF 0 (115-BBLS TOTAL SOAP PUMPED)AND CHASE WITH 8.4-PPG 2%KCL. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 4 of 18 Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/29/2011 00:00 - 02:10 2.17 FISH P WEXIT CONTINUE TO CIRCULATE 1.5X BU AT 2.4-BPM WITH 2380-PSI. TAKE SAFE SURF 0 RETURNS TO TIGER TANK. FLOW CHECK WELL-STATIC. 02:10 - 03:15 1.08 FISH P WEXIT POH WITH BHA#1 AND LINER FISHAT 35-FPM FROM 10322'TO 9770'. CIRCULATE DOWN COIL AT.3-BPM AND HOLD 200-PSI BACK PRESSURE ON BACK SIDE. TAG UP AT 9770'AND OVERPULL 5K-LBS. VARY PU SPEED,WELLHEAD PRESSURE AND PUMP RATE BUT CONTINUE TO HANG UP AT SAME DEPTH. 03:15 - 05:00 1.75 FISH P WEXIT DISCUSS SITUATION WITH CTD SUPERINTENDENT. DECISION MADE TO JAR LIGHTLY TO ATTEMPT TO PASS OBSTRUCTION. STAGE UP OVERPULLS FROM 7K-LBS TO 14K-LBS BUT JARS ARE NOT FIRING. FINAL PU TO 14K-LBS OVER, FISH PULLS FREE AND THEN HANGS UP AT 9756'. SLACK OFF AND COCK JARS. PU TO 13K-LBS OVERPULL AND JARS FIRE. PUMP PRESSURE BEGINS TO BUILD. BLEED PRESSURE OFF AND PU,GS SPEAR RELEASED. RBIH AND ENGAGE GS SPEAR WITH 2K-LBS DOWN AT 9765'. PU TO 13K-LBS OVERPULL AND JARS FIRE. FISH PULLS FREE AND PU WT IS 5K-LBS GREATER THAN TRIP IN THE WELL INDICATING FISH IS STILL LATCHED. CONTINUE TO POH SLOWLY, HOLDING 200-PSI BACK PRESSURE TO 9500'. (FISH ABOVE 4-1/2"X 5-1/2"XO) FLOW CHECK WELL-STATIC. 05:00 - 08:00 3.00 FISH P WEXIT CONTINUE TO POH FROM 9500'. CIRCULATE AT MIN RATE DOWN COIL AND PUMP DOWN BACKSIDE HOLDING 200-PSI BACK PRESSURE. 08:00 - 08:30 0.50 FISH P WEXIT TAG STRIPPER,FLOW CHECK WELL. PJSM FOR UD FISHING BHA AND FISH. 08:30 - 09:00 0.50 FISH P WEXIT LIFT OFF INJECTOR AND SET IT ON LEGS. L/D FISHING TOOLS. LINER IS RECOVERED. 09:00 - 12:00 3.00 FISH P WEXIT UD LINER THAT WAS FISHED OUT OF WELL. UD 18 FULL AND 1 PARTIAL JT(21.14') TOTAL PIPE FISHED IS 601.76'FT, INCLUDING DEPLOYMENT SLEEVE. JET CUT FLARED TO 3.837"OD. 12:00 - 13:30 1.50 FISH P WEXIT FISHED PIPE IS TESTED FOR NORM, NONE FOUND. OFFLOAD FISHED LINER AND FISHING TOOLS FROM RIG. 13:30 - 14:20 0.83 FISH P WEXIT M/U CT RISER, PUMP SLACK BACKWARDS. 14:20 - 16:10 1.83 FISH P WEXIT M/U HYDRAULIC CUTTER,CUT OFF 232 FT OF CT. NO CABLE FOUND. PUMP CABLE FORWARD IN THE CIRC HOLE. PUMP OUT 34 FT OF CABLE WHICH LEAVES TOO LITTLE SLACK, HAVE TO RE-PUMP SLACK. Printed 5/25/2011 4:09:30PM • North America-ALASKA- BP Page 5 of 18 • Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:10 - 16:45 0.58 FISH P WEXIT CUT OFF EXCESS CABLE AND RE-BOOT. MU SLB CTC AND PULL TEST TO 40K-LBS. GOOD TEST. 16:45 18:50 2.08 EVAL P WEXIT HEAD UP BHI TOOLS 18:50 - 20:15 1.42 EVAL P WEXIT PRESSURE TEST CTC TO 250-PSI AND 4000-PSI. SEE DRIP FROM COIL CONNECTOR ON HIGH TEST. BLEED PRESSURE OFF, LD BHI TOOLS AND •CUT CONNECTOR AND 1'OF COIL. DRESS COIL AND INSTALL DIMPLE CONNECTOR. PULL TEST CONNECTOR-GOOD TEST. 20:15 - 20:30 0.25 EVAL P WEXIT REHEAD BHI TOOLS AND PRESSURE TEST COIL CONNECTOR TO 250-PSI AND 4000-PSI. GOOD TESTS. 20:30 - 22:00 1.50 EVAL P WEXIT PRESSURE TEST BHI CHECKS TO 250-PSI LOW. SEEING SLIGHT BLEED-OFF BUT NO VISIBLE LEAKS. BLEED PRESSURE OFF AND CIRCULATE THROUGH COIL. WHEN CIRCULATION ESTABLISHED;SMALL WEEP OF FLUID SEEN AT TOP OF COIL CONNECTOR. WEEP STOPS AS CIRCULATING PRESSURE STABILIZES. REPEAT PROCESS SEVERAL TIMES WITH SIMILAR RESULTS. DISCUSS SITUATION WITH CTD SUPERINTENDENT AND DECIDE TO CUT COIL AND INSTALL CONNECTOR AGAIN. 22:00 - 23:00 1.00 EVAL P WEXIT LD BHI TOOLS AND CUT CONNECTOR AND 9' OF COIL. DRESS COIL AND REINSTALL COIL CONNECTOR. TEST BETWEEN 0-RINGS OF CONNECTOR TO 4000-PSI. GOOD TEST. 23:00 - 23:45 0.75 EVAL P WEXIT REHEAD BHI TOOLS. 23:45 - 00:00 0.25 EVAL P WEXIT PRESSURE TEST COIL CONNECTOR TO 250-PSI/4000-PSI FOR 5-MIN EACH. GOOD TESTS. 4/30/2011 00:00 - 01:15 1.25 EVAL P WEXIT PRESSURE TEST BHI CHECKS TO 250-PSI LOW AND 1500-PSI HIGH. HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TESTS. 01:15 - 02:15 1.00 EVAL P WEXIT PJSM WITH RIG CREW ON MU PDS CALIPER TOOL. MU PDS MEMORY CALIPER TOOLS TO BHI TOOLS BHA CONSISTS OF: PDS MEMORY CALIPER, XO, HOT, DGS, DPS, EDC, POWERCOMMS, LOC, UQC AND XO. OAL=73.43' 02:15 - 08:10 5.92 EVAL P WEXIT STAB ON INJECTOR. RIH WITH PDS MEMORY CALIPER AT 80-FPM. CIRCULATE AT 1.5-BPM WITH 725-PSI THROUGH OPEN EDC. WT CHECK AT 10000'. PU WT=42K-LBS, SO WT=22K-LBS. WAIT AT 10890 FT FOR THE CALIPER ARMS TO OPEN. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 6 of 18 Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:10 - 08:40 0.50 EVAL P WEXIT START LOGGING UP FROM 10890 FT AT 35 FT/MIN. 08:40 - 11:30 2.83 EVAL P WEXIT STOP AT 10000 FT AND ALLOW ARMS TO RETRACT. RECORD SLOW PUMP RATE PRESSURES WITH BOTH PUMPS AND POOH. 11:30 - 13:30 2.00 EVAL P WEXIT TAG STRIPPER, L/D CALIPER BHA AND COILTRAK. NO MISSING ARMS. DOWNLOAD DATA FROM CALIPER TOOL. 13:30 - 16:30 3.00 EVAL P WEXIT SEND RAW DATA TO PDS IN HOUSTON TO GET PROCESSED. 16:30 - 17:30 1.00 EVAL P WEXIT PROCESSED DATA SHOWS ACCEPTABLE ID ACROSS SETTING AREA. CALL BTT FOR GEN 2 WHIPSTOCK. 17:30 - 19:00 1.50 WHIP P WEXIT BRING WHIPSTOCK TO RIG FLOOR. HOLD PJSM WITH RIG CREW ON MU WHIPSTOCK. MU WHIPSTOCK BHA. BHA CONSISTS OF: BAKER GEN II WHIPSTOCK WITH 2-PIP TAGS INSTALLED, HYD SETTING TOOL,XO, HOT, DGS, DPS, EDC, P&C,WEAR SUB, LQC, UQC,XO AND CTC. OAL=80.85' 19:00 - 22:00 3.00 WHIP P WEXIT STAB ON INJECTOR HEAD&BLOW DOWN KILL LINE. OPEN EDC AND ESTABLISH CIRCULATION AT .25-BPM WITH 40-PSI. RIH WITH WHIPSTOCK TO 10775'AT 75-FPM, SLOWING TO 25-FPM THROUGH TUBING JEWELRY. HOLD TABLETOP KICK WHILE DRILLING DRILL WHILE RIH. REVIEW INDIVIDUAL DUTIES OF RIG CREW AND DISCUSSED NECESSARY NOTIFICATIONS IN THE EVENT OF A WELL CONTROL INCIDENT. 22:00 - 22:30 0.50 WHIP P WEXIT LOG TIE IN PASS AT 10775' TO 10857'AT 2-FPM. APPLY-26'CORRECTION TO 10831' PU WT=45K-LBS,SO WT=25K-LBS. 22:30 - 23:00 0.50 WHIP P WEXIT CONTINUE TO RIH TO POSITION BOTTOM OF WS AT 10875.5'/TOP OF WS AT 10858'. _ ORIENT WHIPSTOCK TO 0-DEG. CLOSE EDC. PRESSURE UP TO SET WS AND SEE SHEAR AT 3000-PSI. BLEED PRESSURE OFF AND SET DOWN 2K-LBS ON WS TO CONFIRM SET. 23:00 - 00:00 1.00 WHIP P WEXIT POH WITH WS RUNNING BHA FROM 10858'. OPEN EDC AND CIRCULATE AT 1.15-BPM WITH 470-PSI WHILE POH. 5/1/2011 00:00 - 01:00 1.00 WHIP P WEXIT CONTINUE TO POH WITH WHIPSTOCK RUNNING BHA. 01:00 - 01:20 0.33 WHIP P WEXIT HOLD PJSM ON HANDLING WHIPSTOCK RUNNING BHA. UNSTAB INJECTOR HEAD AND SET BACK IN CIRC HOLE. LD WHIPSTOCK HANDLING TOOLS. TOOLS INDICATE WHIPSTOCK SET CORRECTLY Printed 5/25/2011 4:09:30PM North America -ALASKA- BP Page 7 of 18 • Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:20 - 01:40 0.33 STWHIP P WEXIT _IIILLWEADOI\L_yliLLING BHA._ . BHA CONSISTS OF:3.8"DSM.&REAMER, 2-7/8".6-DEG MOTOR, HOT, DGS, DPS, DEC, P&C,WEAR SUB, LQC,UQC,AND XO. MU TO CTC AND STAB ON INJECTOR HEAD. 01:40 - 04:00 2.33 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA AT 90-FPM TO 10775'. CIRCULATE AT.35-BPM WITH 175-PSI. 04:00 - 04:30 0.50 STWHIP P WEXIT TIE-IN TO GR FROM 10775'TO 10838' APPLY-26'CORRECTION. RIH AT 5-FPM TO LIGHTLY TAG WHIPSTOCK AT 10864.5'. 04:30 - 06:30 2.00 STWHIP P WEXIT OPEN EDC AND DISPLACE WELL TO 8.6-PPG POWERPRO MUD AT 3-BPM WITH 2500-PSI. 06:30 08:30 2.00 STWHIP P WEXIT CONTINUE MUD SWAP, PUMP 3 BPM THROUGH OPEN EDC. 08:30 - 09:30 1.00 STWHIP P WEXIT FINAL MUD TRUCK ARRIVES,CLOSE EDC AND CAPTURE SLOW PUMP RATE PRESSURES. WT CHECK IS 45K AT 10850 FT. TAG AT 10858.5 FT PUMPING. PICK UP TO 10855 FT AND START TIME MILLING,0.1 FT/2 MIN. ZERO DWOB. MAINTAIN OL TF AND 2.5 BPM THROUGHOUT -+ THE MILLING. 9:00 10855.40 FT 2190 PSI 0.01K DWOB. STALL AT 10856.5 FT. UP WT IS 62K,-10K DWOB. 09:30 - 12:30 3.00 STWHIP P WEXIT DISCUSS WITH CTD SUPT AND ODE,DECIDE TO POOH AND PUT 2 JTS OF PH6 IN THE TOOLSTRING. THE OVERPULL AND DEPTH DISCREPANCIES -_I I:'� NOTED ABOVE LIKELY DUE TO THE BHA NOT TRACKING DOWN THE WHIPSTOCK TRAY FACE PROPERLY DUE TO THE RESIDUAL BEND OF THE CT. POOH. 12:30 - 12:45 0.25 STWHIP P WEXIT TAG STRIPPER,TRIP SHEET IS-3 BBLS. FLOW CHECK AND PJSM FOR P/U NEXT BHA. 12:45 - 14:00 1.25 STWHIP P WEXIT STAND BACK INJECTOR. ADD 2 JTS OF PH6 TO THE BHA. CHECK MOTOR AND MILL, LOOKS OK. M/U CT RISER. 14:00 - 16:00 2.00 STWHIP P WEXIT RIH BHA#3. PUMP 0.43/590 PSI THROUGH OPEN EDC. 16:00 - 16:20 0.33 STWHIP P WEXIT LOG FROM 10790 FT TO TIE-IN DEPTH. CORRECT-26 FT. 16:20 - 00:00 7.67 STWHIP P WEXIT CLOSE EDC. DRY TAG WHIPSTOCK AT 10860 FT. FREE SPIN=2220-PSI AT 2.5-BPM. PICK UP TO 10860 FT AND TIME MILL FROM THERE AT 1'PER HR. SEE PINCH PT AT 10864.5'WITH 120-LBS WOB AND 50-PSI MOTOR WORK. INCREASE IN WOB TO 920-LBS AND MOTOR WORK TO 120-PSI AT 10865.5', INDICATING STRING MILL IS CONTACTING CASING. CONTINUE TO TIME MILL AHEAD TO 10868'. WOB FROM PINCH PT VARIES FROM 1900 TO 1400-LBS. CIRCULATION PRESSURE FROM 2420 TO 1450-PSI. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 8 of 18 • operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/2/2011 00:00 - 07:30 7.50 STWHIP P WEXIT CONTINUE TO TIME MILL WINDOW ATI PER HR FROM 10868'TO 10872' WOB VARIES FROM 2200 AND 1800-LBS. CIRC PRESSURE BETWEEN 2370 AND 2260-PSI. BLEED IA FROM 825-PSI TO 200-PSI,MOSTLY GAS. BLEED OA FROM 500-PSI TO 25-PSI, LIQUID. SEE MILL EXIT CASING AT 10871.7'WHEN WOB DROPS FROM 2150 TO 1460 LBS AND PRESSURE DROPS FROM 2480 TO 2350 PSI. FINE METAL ON DITCH MAGNETS 07:30 - 09:30 2.00 STWHIP P WEXIT REACH END OF RATHOLE AT 10882.7 FT. BOTTOMS UP SAMPLE SHOWS LOTS OF SAND AND 2%CEMENT. START UP/DOWN REAMING PASSES. START A 20 BBLS HI-VIS PILL AROUND. MAINTAIN OL TF,NOTHING SEEN ON ANY OF THE PASSES. 09:30 - 10:00 0.50 STWHIP P WEXIT RIH FOR DRY TAG. DRY TAG IS GOOD,PASS WINDOW AT 15 FT/MIN OL TF, NOTHING SEEN. TAG AT 10883 FT. RE-START PUMP AND PULL BACK THROUGH WINDOW. PARK AT 10800 FT AND FLOW CHECK WELL, OPEN EDC. 10:00 - 12:30 2.50 STWHIP P WEXIT POOH. PUMP 2.6 BPM THROUGH OPEN EDC. 12:30 - 13:30 1.00 STWHIP P WEXIT TAG STRIPPER AND FLOW CHECK WELL. UD WINDOW MILL AND STRING REAMER. MILL IS 3.79 GO,3.78 NO-GO. 13:30 - 14:00 0.50 STWHIP • P WEXIT CHECK TREE BOLTS, NONE LOOSE. 14:00 - 14:40 0.67 DRILL P PROD1 M/U BHA#5-HYC BI-CENTER,1.2 DEG XTREME,3"COILTRACK WITH RES. BHA OAL=80.11 FT. 14:40 - 16:45 2.08 DRILL P PROD1 RIH BHA#5. PUMP 0.36/650 PSI THROUGH BIT. CAPTURE SLOW PUMP PRESSURES JUST ABOVE WINDOW. 16:45 - 00:00 7.25 DRILL P PROD1 TIE-IN DEPTH AND CORRECT-28 FT. PASS THROUGH WINDOW WITH 5R TF. DRILL FROM 10883 FT.TO 10938 FT. FREE SPIN AT 2480-PSI WITH 2.85-BPM. SEE MOTOR WORK AT 40-PSI DIFFERENTIAL. RUN WOB BETWEEN 700 AND 200 LBS. MOTOR STALLING PERIODICALLY WITH SLIGHT OVERPULL ON PICKUP BUT ABLE TO RETURN TO BOTTOM CLEAN. GR INDICATES SEVERAL SHALES IN THIS SECTION THAT CORRELATE TO STALLS. 5/3/2011 00:00 - 04:30 4.50 DRILL P PROD1 CONTINUE TO DRILL AHEADFROM_1-0938'to 11000'. MULTIPLE STALLS AT 10963',10973',10976', 10982'. ABLE TO DRILL AHEAD WITH 200-PSI MOTOR WORK AND 550-LBS WOB. ROP IMPROVES TO 28-FPH AT 10984'. ECD AT 9.34-PPG. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 9 of 18 Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 04:45 0.25 DRILL P PROD1 GET SLOW PUMP RATES- 1.25-BPM WITH 1176-PSI;2.5-BPM WITH 2130-PSI. MAKE WIPER TRIP FROM 11000'TO 10700' PUMPING AT 2.9-BPM WITH 2530-PSI CIRCULATE AT.5-BPM WITH O-TF WHEN PULL THROUGH WINDOW-NO ISSUES. 04:45 - 05:30 0.75 DRILL P PROD1 MAKE RA TIE IN PASS FROM 10700'AT 300-FPH. CIRCULATE AT.25-BPM WITH 600-PSI WHILE LOGGING. MAKE+2'CORRECTION TO PUT RA TAG AT 10868.5'. 05:30 - 06:00 0.50 DRILL P PROD1 CONTINUE TO RIH FROM 10900'TO TAG BOTTOM AT 11,002' FREE SPIN AT 2.8-6-BPM WITH 2520-PSI WHILE RIH. TAG BOTTOM AND SEE 500-LBS WOB AND 100-PSI MOTOR WORK IMMEDIATELY. IA AND OA ARE BOTH AT 392-PSI. 06:00 - 12:30 6.50 DRILL P PROD1 DRILL AHEAD FROM 11002 FT. 2.86 BPM @ 2530 PSI FS. PVT=397 BBLS. DRILL TO 11175 FT. 12:30 - 13:15 0.75 DRILL P PROD1 LONG WIPER FROM 11175 FT. PULL THRU WINDOW CLEAN AND OPEN EDC. JET 7"CASING AND PULL UP INTO 4-1/2"TT TO 10300 FT. 13:15 - 13:45 0.50 DRILL P PROD1 RBIH FROM 10300 FT. CLOSE EDC AND RIH THRU WINDOW W/ PUMPS OFF. RIH TO BOTTOM AND TAG AT 11175 FT. 13:45 - 18:20 4.58 DRILL P PROD1 DRILL AHEAD FROM 11175 FT. 2.90 BPM @ 2630 PSI FS. PVT=386 BBLS. ECD=9.44 PPG. IA/OA=563 PSI/544 PSI. DRILL TO 11350 FT. 18:20 - 19:00 0.67 DRILL P PROD1 WIPER TO WINDOW FROM 11350 FT. RBIH TO BOTTOM. OBTAIN SPR'S FOR BOTH PUMPS. 19:00 - 00:00 5.00 DRILL P PROD1 RIH AND DRILL AHEAD FROM 11350 FT. 2.85 BPM @ 2600 PSI FS. 150-250 PSI MW W/2-4K#DHWOB. ROP—35 FPH. BHP/ECD/PVT:4330 PSI/9.46 PPG/366 BBLS. IA/OA:728 PSI/690 PSI. PUMP 10 BBL LO-VIS/10 BBL HI-VIS SWEEP. DRILL TO 11488 FT. 5/4/2011 00:00 - 00:20 0.33 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 11488 FT. DRILL TO 11500 FT AND BEGIN WIPER. 00:20 - 01:00 0.67 DRILL P PROD1 WIPER TO WINDOW AND UP INTO 4-1/2". PVT=389 BBLS. PULL THRU WINDOW AT MIN. RATE AND OL TF. 01:00 - 01:15 0.25 DRILL P PROD1 OPEN EDC AND JET 7"LINER. 3.9 BPM @ 3105 PSI. PUH INTO 4-1/2"TO 10300 FT. GOOD INCREASE IN CUTTINGS SEEN COMING OVER SHAKER W/PILL. SMALL AMOUNTS OF RUBBER ALSO NOTED. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 10 of 18 • Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:15 - 02:00 0.75 DRILL P PROD1 RIH TO WINDOW AND CLOSE EDC. LOG GR TIE-IN ACROSS RA TAG AND MAKE +4 FT CORRECTION. CONTINUE RIH TO BOTTOM. 02:00 - 05:00 3.00 DRILL P PROD1 TAG AT 11500 FT.AND DRILL AHEAD. 2.89 BPM @ 2650 PSI FS. 3-4K#DHWOB W/100-200 PSI MW. BHP/ECD/PVT:4382 PSI/9.46 PPG/370 BBLS. WH/IA/OA:48 PSI/699 PSI/677 PSI. 05:00 - 08:40 3.67 DRILL P PROD1 CONTINUE DRILLING AHEAD IN BUILD SECTION. PAST 11540 FT ROP INCREASE TO 45 FPH. 2.87 BPM @ 2800-2900 PSI CIRC. BHP/ECD/PVT:4395 PSI/9.48 PPG/368 BBLS. WH/IA/OA:48 PSI/748 PSI/699 PSI. 08:40 - 09:00 0.33 DRILL P PROD1 CONTINUE MUD SWAP. HOLD 60L TF FOR NOW TO CONTINUE BUILDING ANGLE. ROP IS AROUND 20 FT/HR WITH 3.5-4K DWOB. NEW FS IS 2400 PSI. DRILL TO 11665 FT. 09:00 - 10:15 1.25 DRILL P PROD1 WIPER TRIP FROM 11665 FT. CLEAN PASS UP AND DOWN..MAINTAIN AS DRILLED TF WHILE RIH. 10:15 - 15:00 4.75 DRILL P PROD1 DRILL FROM 11665 FT. CONTINUE HOLDING 65L TF TO SLOWLY BUILD ANGLE. INITIAL ROP IS 20-30 FT/HR WITH 3-4K DWOB. SEE FIRST EVIDENCE OF HOT IN 11675 SAMPLE. ROP SLOWS TO 10-20 FT/HR AFTER 11710 FT WITH 4K DWOB,LATER PICKS UP TO 60 FT/HR PAST 11740 FT. PUMP 10 BBLS LO AND HI-VIS SWEEP AROUND. DRILL TO END OF BUILD SECTION AT 11765 FT. 15:00 - 15:20 0.33 DRILL P PROD1 PICKUP SLOWLY. SURVEY VALIDATION LOG FROM 11645 TO 11630 FT WHILE POOH. 15:20 - 16:00 0.67 DRILL P PROD1 DECIDE TO DRILL ANOTHER 35 FT. DRILL TO 11800 FT. 16:00 - 19:00 3.00 DRILL P PROD1 POOH. PULL THROUGH WINDOW AT 0.5 BPM, RECIP PIPE THEN OPEN EDC. FLOW CHECK WELL-NO FLOW. PUMP AT MAX RATE THRU OPEN EDC UP THRU 7"AND INTO 4-1/2". REDUCE RATE ONCE INSIDE 4-1/2"TUBING TO 2.70 BPM AT 2000 PSI CIRC. 19:00 - 19:15 0.25 DRILL P PROD1 PJSM FOR L/D BHA#5. DISCUSS JOB PROCEDURES&RESPONSIBILITIES,WELL CONTROL,AND DROPPED OBJECTS. 19:15 - 19:30 0.25 DRILL P PROD1 TAG UP AND SHUT DOWN PUMPS. FLOW CHECK WELL-NO FLOW. LOST 8 BBLS ON TOH. 19:30 - 20:00 0.50 DRILL P PROD1 UNSTAB INJ.AND SET OVER BUNGHOLE. BLOW DOWN BHI TOOLS. L/D BHA#5. BIT GRADED 6-4. BIT WAS RUNG OUT AND GAUGED 3.73"GO/3.72"NO-GO. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 11 of 18 • Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:45 0.75 BOPSUR P PROD1 FILL HOLE-TOOK-0.5 BBL. INSTALL NIGHT CAP. CLOSE MASTER AND SWAB-23 TURNS EACH. BLOW DOWN STACK. 20:45 - 21:00 0.25 BOPSUR P PROD1 AAR FOR L/D BHA AND PJSM FOR FUNCTION TESTING BOP'S. 21:00 - 21:45 0.75 BOPSUR P PROD1 FUNCTION TEST BOP'S FROM BOTH OPS CAB AND RIG FLOOR PANELS. HOLD AAR ON FUNCTION TESTING BOP'S. 22:45 - 23:00 0.25 DRILL P PROD1 PJSM FOR TESTING CHECKS. P/U INJ.REMOVE CHECKS AND INSPECT. INSTALL CHECKS AND PT TO 250 PSI/1500 PSI. 23:00 - 00:00 1.00 DRILL P PROD1 PJSM FOR M/U BHA. M/U BHA#6 CONSISTING OF 3"COILTRAK BHA, RSM,AND 3.75"GAUGE PDC BIT. BHA OAL=73.58'. P/U INJ. AND STAB. TEST RSM AT SURFACE PRIOR TO RIH. 5/5/2011 00:00 - 02:30 2.50 DRILL P PROD1 RIH W/BHA#6. PVT=295 BBLS. 0.3 BPM @ 700 PSI CIRC. OBTAIN UP/DOWN WTS.AT 10800 FT. 48K# UP WT./24K#DOWN WT. SLOW DOWN TO 25 FPM AS APPROACHING WINDOW. SET DOWN AT 10886 FT. UNCORRECTED. P/U TO 10830 FT.TO LOG GR TIE-IN BEFORE RUNNING THRU WINDOW. 02:30 - 02:45 0.25 DRILL P PROD1 LOG CASED HOLE GR TIE-IN FROM 10830 FT. MAKE-28 FT. CORRECTION. 02:45 - 03:20 0.58 DRILL P PROD1 RIH TO WINDOW. BRING PUMP DOWN AND PASS THRU WINDOW CLEAN. RIH TO 11650 FT. 03:20 - 03:40 0.33 DRILL P PROD1 P/U SLOWLY AND PERFORM SURVEY VALIDATION LOG FROM 11640'- 11620'. 03:40 - 04:00 0.33 DRILL P PROD1 CONTINUE RIH TO BOTTOM. OBTAIN SPR'S AT 11750 FT. TAG BOTTOM AT 11802 FT. LOST-9 BBLS ON TIH. 04:00 - 07:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11802 FT. 2.50 BPM IN/OUT @ 2130 PSI FS. BHP/ECD/PVT:4348 PSI/9.0 PPG/351 BBLS. WH/IA/OA:48 PSI/312 PSI/176 PSI. POINT DOWN AS PER GEO SEARCHING FOR MHO CATCHING 25 FT.SAMPLES. TARGET 87 DEG INC. ROP 80-100 FPH. 1-1.5K#DHWOB. 100-150 PSI MW. 07:00 - 08:40 1.67 DRILL P PROD1 WIPER TRIP FROM 11950 FT TO WINDOW. 08:40 - 09:50 1.17 DRILL P PROD1 CONTINUE DRILLING FROM 11950 FT. LEVEL OFF AT 90 DEG AT 8990 FT TVD. ROP IS AROUND 100-120 FT/HR WITH 2K DWOB. DRILL TO 12100 FT. 09:50 - 11:10 1.33 DRILL P PROD1 WIPER TRIP FROM 12100 FT TO WINDOW. CLEAN PASS UP AND DOWN. 150 PSI MW SEEN BRIEFLY AT 11540 FT ON THE WAY DOWN. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 12 of 18 • operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:10 - 13:00 1.83 DRILL P PROD1 DRILL FROM 121_0_0 FT. GRADUALLY MOVE UP ABOUT 5 FT TVD. ROP IS AROUND 120 FT/HR WITH 2K DWOB. BHA IS STILL SLIDING EASILY, NO HOLE PROBLEMS SEEN TO 12250 FT. DRILL TO 12250 FT. 13:00 - 13:30 0.50 DRILL P PROD1 CONDUCT RIG FIRE DRILL WITH SIMULATED FIRE IN CELLAR. ALL CREWS RESPOND APPROPRIATELY. HOLD AAR AND DISCUSS LESSONS LEARNED. 13:30 - 14:20 0.83 DRILL P PROD1 WIPER TRIP FROM 12250 FT TO INSIDE • TUBING TAIL PULL THROUGH WINDOW AND OPEN EDC, PUMP 4.1 BPM WHILE PULLING THROUGH 7" CASING. 14:20 - 14:50 0.50 DRILL P PROD1 STOP AND ADJUST 1502 PUMP LINE INSIDE • REEL TO GIVE MORE CLEARANCE TO REEL FRAME. PRESSURE TEST 1502 LINE AFTER • CONNECTIONS ARE TIGHTENED UP AGAIN. 14:50 - 15:30 0.67 DRILL P PROD1 CONTINUE WIPER TRIP. TIE-IN DEPTH,CORRECT+7 FT. DIFFICULTY IN GETTING THORUGH WINDOW, SET DOWN 5 TIMES. PICK AND SPIN BIT,3 TIMES, NO GO. SET DOWN AT BOTTOM OF WINDOW,TRY TO USE THE LOWER PAD ON THE RSM TO ELEVATE THE BIT, NO LUCK. PICK UP ABOVE THE WINDOW AND PUMP MIN RATE, NO GO. PICK UP AGAIN AND EXTEND THE LOWER PAD, RIH 10 FT/MIN PASS THROUGH WINDOW AND RETRACT LOWER PAD. 15:30 - 16:30 1.00 DRILL P PROD1 CONTINUE WIPER TRIP TO BOTTOM. 16:30 - 18:30 2.00 DRILL P PROD1 DRILL FROM 12250 FT. CONTINUE TO HOLD 8984 FT TVD. ROP-100 FPH DOWN TO 12340 FT AND THEN SLOWS. 18:30 - 00:00 5.50 DRILL P PROD1 DRILL AHEAD FROM 12340 FT. 2.62 BPM IN/OUT @ 2250-2500 PSI CIRC. 1.5-2.5K#DHWOB. ROP-5 FPH DRILLING THRU SHALE STRINGER. BHP/ECD/PVT:4449 PSI/9.54 PPG/375 BBLS. WH/IA/OA: 51 PSI/634 PSI/599 PSI. HOLDING 8984 FT.SSTVD. DRILLING TO 12372 FT. 5/6/2011 00:00 - 00:30 0.50 DRILL P PROD1 DRILL LATERAL SECTION FROM 12372 FT. 2.49 BPM IN/OUT @ 2300-2550 PSI CIRC. 2-3.5K#DHWOB. ROP-5 FPH. SAMPLE FROM 12350 FT.SHOW MICROPOROUS CHERT AND SILTSTONE/SHALES. BHP/ECD/PVT:5130 PSI/9.41 PPG/353 BBLS. W WIA/OA: 55 PSI/745 PSI/697 PSI. HOLDING 8984 FT.SSTVD. HOLE TAKING APPROX 4 BPH. 00:30 - 03:45 3.25 DRILL P PROD1 WIPER TRIP FROM 12372 FT TO 10870 FT. CLEAN. OBTAIN SPR FOR#1 AND#2 MP. Printed 5/25/2011 4:09:30PM North America -ALASKA- BP Page 13 of 18 t,peration Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:45 - 04:10 0.42 DRILL P PROD1 BACK ON BOTTOM,STACKING WEIGHT, ATTEMPTING TO DRILL FROM 12372 FT. 2.49 BPM IN/OUT @ 2250-2500 PSI CIRC. ROP—0 FPH. BHP/ECD/PVT:4851 PSI/9.47 PPG/349 BBLS. WH/IA/OA: 59 PSI/745 PS_I/719 PSI. 04:10 - 07:30 3.33 DRILL P PROD1 POH TO CHECK BIT. 10 MINUTE FLOW CHECK AT WINDOW. STATIC CONTINUE POH. 07:30 - 09:00 1.50 DRILL P PROD1 TAG STRIPPER, LID BHA. BIT IS 8-8, RUNG OUT. GAUGE IS 3.59"NO-GO. 09:00 - 10:00 1.00 DRILL P PROD1 ADJUST REEL,SHIM IT OVER 1/2"TO PREVENT 1502 FROM RUBBING ON REEL FRAME. 10:00 - 12:00 2.00 DRILL P PROD1 RIH BHA#7-NEW 3.74"NO-GO RSM PDC BIT, RSM WITH 3"COILTRAK WITH RES. 12:00 - 12:55 0.92 DRILL P PROD1 TIE-IN DEPTH,CORRECT-28 FT. TAG WINDOW 2X. PU AND EXTEND 2 LOWER RSM PADS, NO GO. PU, RETRY 8.5 FT/MIN WITH NO PADS, NO GO. TRY WITH LOWER LEFT THEN LOWER RIGHT PAD,PUMPS ON MIN RATE AND OFF, NO GO. EVENTUALLY PASS WINDOW WITH NO PUMP,LOWER LEFT PAD EXTENDED,30 FT/MIN. 12:55 - 14:30 1.58 DRILL P PROD1 RIH FROM WINDOW TO 12,300 FT. REAM BACK TO BOTTOM AT 3-4 FT/MIN. PICK UP AT 12,200 FT AND GET SPP. REAM BACK TO 12369 FT. DRILL FROM 12370 FT TO 12435 FT. 14:30 - 14:45 0.25 DRILL P PROD1 KICK WHILE DRILLING EXERCISE. DRILLER SIMULATED A PIT GAIN. SLB SUPERVISOR RESPONDS BY PICKING UP CT AND FLOW CHECKING WELL. CONDUCT AAR AND DOCUMENT. 14:45 - 16:05 1.33 DRILL P PROD1 CONTINUE DRILLING TO 12500 FT. SEND LO/HI VIS SWEEP AROUND. 16:05 - 18:15 2.17 DRILL P PROD1 WIPER TRIP FROM 12500 FT TO WINDOW. SET DOWN IN 22N SHALE AT 11515 FT, P/U AND GO THROUGH AT REDUCED RATE. FIRST TIME THIS SHALE IS SEEN. 18:15 - 21:30 3.25 DRILL P PROD1 BOBD. DRILL AHEAD FROM 12500 FT. CONTINUE HOLDING LEVEL AT 8984 FT. SSTVD. 2.5 BPM @ 2660 PSI FS. 1-2K#DHWOB. ROP IS 50-70 FPH.PICKS UP TO 100 FPH PAST 12610 FT. BHP/ECD/PVT:4545 PSI/9.75 PPG/384 BBLS. WH/IA/OA:62 PSI/558 PSI/531 PSI. DRILL TO 12650 FT. 21:30 - 23:30 2.00 DRILL P PROD1 LONG WIPER BACK TO 4-1/2"TUBING TAIL FROM 12650 FT. PVT=391 BBLS. HELD KWT DRILL FOLLOWED BY AAR. ALL CREW MEMBERS RESPONDED APPROPRIATELY. PULL ABOVE WINDOW AND OPEN EDC. JET 7"CASING AT 3.9 BPM-3220 PSI CIRC. Printed 5/25/2011 4:09:30PM North America -ALASKA- BP Page 14 of 18 • Operation Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:30 - 00:00 0.50 DRILL P PROD1 C/O SWABS ON PUMP#2 TO OVERSIZE WHILE IN CASED HOLE. LOG GR TIE-IN AND MAKE+3 FT. CORRECTION. 5/7/2011 00:00 - 01:30 1.50 DRILL P PROD1 CONTINUE RIH FOLLOWING TIE-IN. CLOSE EDC. TAG AT BOTTOM OF WINDOW W/PUMPS OFF,30 FPM,AND LOWER PAD EXTENDED. P/U AND TRY AGAIN-PASS THRU WINDOW. SLIGHT WT. BOBBLE AND MW AT 11515 FT. HOLE SMOOTH OTHERWISE. 01:30 - 04:00 2.50 DRILL P PROD1 OBTAIN NEW SPR'S. DRILL AHEAD FROM 12650 FT. 2.5 BPM @ 2670 PSI FS. ROP 80-100 FPH.OCCASIONAL STALLS. BHP/ECD/PVT:4590 PSI/9.84 PPG/378 BBLS. WH/IA/OA: 59 PSI/713 PSI/710 PSI. 04:00 - 06:30 2.50 DRILL P PROD1 WIPER TO WINDOW FROM 12800 FT. PVT=364 BBLS. SLIGHT MW SEEN AT 11500 FT ON WAY UP. 06:30 - 08:30 2.00 DRILL P PROD1 DRILL FROM 12800 FT TO 12888 FT. VERY RATTY DRILLING TOWARDS THE END IN WHAT SHOULD BE CLEAN SAND. 08:30 - 11:30 3.00 DRILL P PROD1 POOH TO CHECK BIT. 11:30 - 12:30 1.00 DRILL P PROD1 TAG STRIPPER AND FLOW CHECK WELL. CHANGE OUT BIT,GRADE IS 3-5 WITH BROKEN TEETH. 3.67"NO-GO. 12:30 - 16:00 3.50 DRILL P PROD1 RIH BHA#8-RSM,3.0 COILTRAK WITH RES. BHA OAL=73.58 FT. • TIE-IN DEPTH,CORRECT-28 FT. PASS THROUGH WINDOW AT 90L EQUIVALENT TF, NO PUMPS. RIH TO BOTTOM. CLEAN PASS TO BOTTOM. 16:00 - 17:30 1.50 DRILL P PROD1 START DRILLING AT 12890 FT. DIFFICULT SLIDING,START SWAP TO NEW MUD. DRILL TO 13050 FT. 18:00 - 21:45 3.75 DRILL P PROD1 PUH SLOWLY WHILE CIRC. NEW MUD ALL THE WAY AROUND. NEW MUD AROUND AT 18:30. FINISH OFF-LOADING OLD MUD AND BLOW ON NEW MUD INTO PITS. CONTINUE W/WIPER TO WINDOW. PITS 3&5 ACTIVE-PVT=94 BBLS. 21:45 - 23:30 1.75 DRILL P PROD1 OBTAIN NEW SPR'S W/NEW MUD. TAG BOTTOM AND DRILL AHEAD FROM 13050 FT. PLAN IS TO DRILL TO 13200 FT.HOLDING LEVEL AT 8984 FT. SSTVD AND THEN BEGIN CLIMBING TO 95 DEG INC IN ANTICIPATION OF 22N SHALE. ONCE ON BOTTOM BLOW ON ADDITIONAL 90 BBLS NEW MUD INTO PITS. 1-2K#DHWOB. ROP 150 FPH. BHP/ECD/PVT:4604 PSI/9.88 PPG/237 BBLS. PUMP 10 BBL HI-VIS/10 BBL LO-VIS SWEEP. DRILL TO 13205 FT. 23:30 - 00:00 0.50 DRILL P PROD1 LONG WIPER TO THE 4-1/2"TUBING TAIL. PVT=344 BBLS. Printed 5/25/2011 4:09:30PM North America -ALASKA- BP Page 15 of 18 • Uperation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/8/2011 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE W/WIPER TRIP FROM 13205 FT. PULL THRU WINDOW CLEAN AND OPEN EDC. RAMP UP PUMPS TO 4.0 BPM AND JET 7" LNR. CLOSE EDC AND RIH THRU WINDOW CLEAN- 30 FPM W/LOWER PADS EXTENDED. 02:00 - 03:45 1.75 DRILL P PROD1 LOG GR TIE-IN AND MAKE+4.5 FT CORRECTION. CONTINUE RIH TO BOTTOM. HOLE SMOOTH. 03:45 - 05:45 2.00 DRILL P PROD1 DRILL AHEAD FROM 13205 FT. BEGIN POINTING UP BUILDING TO 95 DEG INC. 2.70 BPM @ 2520 PSI FS. 1.0-2.5K#DHWOB. ROP 100-150 FPH. BHP/ECD/PVT:4643 PSI/9.37 PPG/337 BBLS. WH/IA/OA:66 PSI/680 PSI/706 PSI. DRILL TO 13342 FT.AND MAKE WIPER TO WINDOW. 05:45 - 08:40 2.92 DRILL P PROD1 WIPER TO WINDOW. PVT=330 BBLS. 08:40 - 12:30 3.83 DRILL P PROD1 BACK ON BOTTOM DRILLING FROM 13342 FT. VERY SLOW DRILLING THROUGH SILTSTONE AT THE BASE OF THE 22N. STACKING-10K SURFACE WT TO GET ABOUT 3K DWOB. DRILL TO 13365 FT. 12:30 - 16:00 3.50 DRILL P PROD1 POOH TO CHECK BIT. PULL THROUGH WINDOW AND RECIP PIPE, THEN OPEN EDC. 16:00 - 17:00 1.00 DRILL P PROD1 TAG STRIPPER AND FLOW CHECK WELL, NO FLOW. L/D BIT, GRADED 2-3. M/U NEW 3.75"HCC BIT. M/U CT RISER. 17:00 17:10 0.17 DRILL P PROD1 RIH W/BHA#9 CONSISTING OF NEW 3.75" HCC BIT. PVT=232 BBLS. 17:10 - 17:30 0.33 DRILL P PROD1 WHILE RIH AT 400 FT.A GAIN IN THE PITS WAS NOTICED BY SLB DRILLER. S/D PUMPS AND CHECK FOR FLOW-NO FLOW. W/PUMPS OFF AND NO FLOW OBSERVED STILL SHOW PITS GAINING. INVESTIGATE DISCREPANCY AND FIND 2" WATER LINE USED TO FLUSH CENTRIFUGE IS OPEN. A TOTAL OF 18 BBLS OF FRESH WATER WAS ADDED TO THE PITS FROM THE 2"WATER LINE. 17:30 - 21:15 3.75 DRILL P PROD1 CONTINUE RIH W/BHA#9. PVT=252 BBLS. 21:15 - 00:00 2.75 DRILL P PROD1 OBTAIN SPR'S. TAG BOTTOM AT 13360 FT.AND DRILL AHEAD. MAINTAIN 95 DEG INC. 2.50 BPM @ 2490 PSI FS. 1.5-3K#DHWOB. ROP VERY SLOW DRILLING THRU 22N. LESS THAN 5 FPH. BHP/ECD/PVT:4652 PSI/9.98 PPG/368 BBLS. DRILL TO 13368 FT. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 16 of 18 • Operation Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/9/2011 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 13368 FT. ROP IS NON-EXISTENT AT 1-2 FPH. GETTING GOOD WT.TRANSFER W/LITTLE TO NO MW. DRILL TO 13370 FT. DECIDE TO POOH W/RSM TO P/U CONVENTIONAL DRILLING ASSEMBLY. 02:00 - 03:15 1.25 DRILL P PROD1 POOH W/BHA#9. PVT=368 BBLS. 03:15 03:30 0.25 DRILL P PROD1 PUH ABOVE WINDOW. SHUT DOWN PUMPS AND OPEN EDC. FLOW CHECK WELL-NO FLOW. 03:30 - 06:00 2.50 DRILL P PROD1 BRING PUMPS UP TO 4 BPM/3150 PSI AND CONTINUE POOH W/BHA#9. PVT=343 BBLS. 06:00 - 07:00 1.00 DRILL P PROD1 TAG STRIPPER, L/D BHA#9. 07:00 - 10:10 3.17 DRILL P PROD1 M/U BHA#10 ON CATWALK. PT FLOAT SUB 250/1500 PSI,GOOD. P/U BHA#10-HYC 3.75 BIT,1.2 DEG XTREME, AGITATOR,3"COILTRAK WITH RES. BHA OAL=88.05 FT. 10:10 - 12:40 2.50 DRILL P PROD1 RIH BHA#10. TEST AGITATOR AT 300 FT,WORKING GOOD. RIH, PUMP 0.30/1070 PSI THROUGH THE BIT. TIE-IN DEPTH,CORRECT-31 FT. 12:40 - 14:20 1.67 DRILL P PROD1 PASS THROUGH WINDOW ON 1ST ATTEMPT AT OL TF,20 FT/MIN. RIH TO BOTTOM. GET SLOW PUMP PRESSURES AT 13300 FT. 14:20 - 15:20 1.00 DRILL P PROD1 DRILL FROM 13360 FT. START AT 6OR TF. INITIAL ROP IS 30-40 FT/HR WITH 3K DWOB. 2.54/2.52 BPM @ 3200-3600 PSI. ECD= 10.12 PPG. AFTER 13375 FT ROP GOES TO 80-100 FT/HR. DRILL TO 13410 FT. 15:20 - 16:20 1.00 DRILL P PROD1 PULL 100 FT WIPER. MOTOR WORK AND STALL AT 13345 FT, RUN BACK DOWN AND PULL THROUGH IT SLOWER. SLIGHT MOTOR WORK SEEN THE SECOND TIME. DRILL TO 13500 FT. 16:20 - 19:45 3.42 DRILL P PROD1 WIPER TRIP TO WINDOW. HELD KWT DRILLING FOLLOWED BY AAR WHILE CONDUCTING WIPER. HOLE CLEAN BOTH WAYS. 19:45 - 21:30 1.75 DRILL P PROD1 TAG BOTTOM AT 13500 FT.AND DRILL AHEAD. HOLDING 180 DEG TF INITIALLY TO HEAD BACK DOWN AFTER CROSSING 22N AND GAIN STAND-OFF FROM PGOC. STARTED REVERTING AT 8950 FT SSTVD. 2.52 BPM @ 3200 PSI FS. 1-2.5K#DHWOB. ROP—125 FPH. BHP/ECD/PVT:4711 PSI/10.12 PPG/339 BBL. WH/IA/OA:59 PSI/879 PSI/798 PSI. DRILL TO 13660 FT. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 17 of 18 • • t,peration Summary Report Common Well Name:02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 00:00 2.50 DRILL P PROD1 LONG WIPER FROM 13660 FT. PVT=332 BBLS. SMOOTH PULLING THRU 22N FROM 13435 FT -13336 FT. SMALL CHUNKS OF STATOR RUBBER SEEN COMING ACROSS SHAKER. S/D PUMPS AND PULL THRU WINDOW CLEAN ATOLTF. OPEN EDC ABOVE WINDOW AND PUMP AT 4 BPM UP TO 10300 FT. 23:45-TURN AROUND AND HEAD BACK TO BOTTOM. 5/10/2011 00:00 - 02:30 2.50 DRILL P PROD1 CONTINUE RIH FOLLOWING WIPER TRIP. CLOSE EDC AND RIH THRU WINDOW AT OL TF. LOG GR TIE-IN AND MAKE+8'CORRECTION. CLEAN PASS DOWN. OBTAIN NEW SPR'S @ 13600 FT. 02:30 - 04:00 1.50 DRILL P PROD1 TAG BOTTOM AT 13660 FT.AND DRILL AHEAD. 2.42 BPM IN/OUT @ 3500-3700 PSI CIRC. 1-2K#DHWOB. ROP 100-140 FPH. BHP/ECD/PVT:4765 PSI/10.24 PPG/303 BBLS. PUMP 10 BBL LO/10 BBL HI-VIS SWEEP AROUND. DRILL TO 13815 FT. 04:00 - 07:30 3.50 DRILL P PROD1 WIPER TO WINDOW. PVT=316 BBLS. NO INCREASE IN CUTTINGS SEEN COMING UP W/SWEEP. CLEAN PASS UP AND DOWN. 07:30 - 09:00 1.50 DRILL P PROD1 DRILL FROM 13815 FT. CONTINUE FOLLOWING FORMATION DIP ABOUT 5-6 FT ABOVE THE 22N SHALE. ROP IS AROUND 120-150 FT/HR WITH 2-3 K DWOB. DRILL TO 13950 FT. PUMP LO-VIS/HI-VIS SWEEP. 09:00 - 11:15 2.25 DRILL P PROD1 WIPER TRIP FROM 13950 FT. PULL THROUGH WINDOW AND RECIP PIPE, THEN OPEN EDC AND JET 7"CASING. 11:15 - 13:15 2.00 DRILL P PROD1 LOG TIE-IN AND MAKE+4 FT.CORRECTION. RIH TO BOTTOM. HOLE CLEAN. 13:15 - 15:00 1.75 DRILL P PROD1 DRILLA.HEADFROM 13950.FT. .. 2.5 BPM @ 3360 PSI. PVT=290 BBLS. DRILL TO 14100 FT. 15:00 - 19:00 4.00 DRILL P PROD1 WIPER TO WINDOW FROM 14100 FT. 19:00 - 20:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 14100 FT. 2.3 BPM @ 3100 PSI FS. PVT=343 BBLS. ROP 80 FPH. DRILL TO 14175 FT.AND CALL TD. 20:00 - 22:15 2.25 DRILL P PROD1 WIPER TO CONDITION HOLE FOR RUNNING LINER AND TO TIE-IN. PVT=339 BBLS. HOLE SMOOTH GOING UP. P/U CLEAN THRU WINDOW.OPEN EDC AND JET 7"CASING. Printed 5/25/2011 4:09:30PM North America-ALASKA- BP Page 18 of 18 ( peration Summary Report Common Well Name: 02-21 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/26/2011 End Date: X3-00YL4-C(2,433,581.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:15 - 00:00 1.75 DRILL P PROD1 RIH TO WINDOW AND CLOSE EDC. PASS THRU WINDOW CLEAN. LOG GR TIE-IN AND MAKE+5 FT. CORRECTION. CONTINUE RIH TO TAG CORRECTED TD. 5/11/2011 00:00 - 00:45 0.75 DRILL P PROD1 CONTINUE RIH FROM 13100 FT. RUN PAST 22N SHALE CLEAN. 'START LINER PILL W/ALPINE BEADS DOWN COIL. TAG CORRECTED TD @ 14184 FT._ 00:45 - 02:30 1.75 DRILL P PROD1 POOH W/BHA#10 LAYING IN LINER PILL. HELD TABLETOP KWD DRILL FOLLOWED BY AAR. PUH ABOVE WINDOW AND S/D PUMPS. OPEN EDC. 02:30 - 02:45 0.25 DRILL P PROD1 FLOW CHECK WELL-NO FLOW. 02:45 - 05:30 2.75 DRILL P PROD1 CONTINUE POOH. PUMP AT MAX RATE THRU OPEN EDC. 4 BPM @ 3570 PSI. PAINT EOP FLAGS AT 10090 FT AND 6769 FT ON WAY OUT. 05:30 - 06:40 1.17 DRILL P PROD1 TAG UP AND S/D PUMPS. FLOW CHECK WELL-NO FLOW. 06:40 - 07:00 0.33 DRILL P PROD1 PJSM AND LAY DOWN BHA ***ALL SUBSEQUENT REPORTS UNDER CON EVENT*** Printed 5/25/2011 4:09:30PM • North America -ALASKA- BP Page 1 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/1/2011 End Date: 5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/11/2011 07:00 - 08:40 1.67 CASING P RUNPRD P/U INJ.AND CUT OFF COIL CONNECTOR. PJSM FOR PUMPING SLACK. PUMP SLACK FORWARD AND RECOVER 152 FT.OF E-LINE. CALCULATED SLACK WAS 240 FT. 08:40 - 09:20 0.67 CASING P RUNPRD PUMP SLACK FORWARD AGAIN USING WATER @ 5 BPM. NO ADDITIONAL SLACK RECOVERED. 09:20 - 10:20 1.00 CASING P RUNPRD DRIFT COIL W/3/4"BALL AND RECOVER .SAME. 10:20 - 11:10 0.83 CASING P RUNPRD PUMP WATER OUTSIDE INTO TIGER TANK- 110 BBLS. 11:10 - 12:15 1.08 CASING P RUNPRD PJSM AND PU INJECTOR AND PREP COIL FOR CC-INSTALL BTT COIL CONNECTOR. 12:15 - 12:40 0.42 CASING P RUNPRD PJSM TO PU AND RUN LINER. 12:40 - 18:00 5.33 CASING P RUNPRD MAKE UP LINER. HELD KWT DRILL FOLLOWED BY AAR-GOOD CREW RESPONSE. 18:00 - 18:30 0.50 CASING P RUNPRD CREW C/O. DISCUSS CURRENT OPS AND MAKE RIG ROUNDS AND CHECKS. HOLD PJSM FOR CONTINUING TO M/U LINER -DISCUSS WELL CONTROL,DROPPED OBJECTS,AND PINCH POINTS. 18:30 - 22:15 3.75 CASING P RUNPRD CONTINUE M/U LINER STARTING W/JT.#100. FILL LINER AND HOLE EVERY 10 JTS. RUN. HOLE TAKING APPROXIMATELY 2 BPH. HELD KWT DRILL-CREW RESPONDED CORRECTLY BY P/U SAFETY JT AND M/U TO LINER. FINISH M/U LINER CONSISTING OF 2-7/8" BIAS EDGE GUIDE SHOE,2-7/8"FLOAT,1 JT 2-7/8"L-80,2-7/8"FLOAT,2-7/8"PUP JT,2-7/8" LANDING COLLAR,2-7/8"PUP JT,2-7/8" STAGE COLLAR,36 JTS 2-7/8"L-80,2-7/8"PUP JT,37 JTS 2-7/8"L-80,3-3/16"X 2-7/8"XO,46 JTS 3-3/16"L-80, 3-1/2"X 3-3/16"XO,1 JT 3-1/2" L-80, OTIS"X"NIPPLE W/2.812"PROFILE, ,. / 3-1/2"L-80 PUP JT,AND 3.70"DEPLOYMENT SLEEVE. M/U WORKSTRING TO LINER W/4 JTS.OF 2-3/8"PH6 INCLUDED. 22:15 - 00:00 1.75 CASING P RUNPRD STAB ON INJ.AND FILL HOLE. TAKES—3 BBLS TO CATCH RETURNS. RIH W/LINER. 0.25 BPM @ 1290 PSI. PVT= 208 BBLS. LINER OAL=3856.47 FT. BHA OAL=3993.45 FT. HELD AAR FOR KWT DRILL WHILE RIH W/ LINER. Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 2 of 9 operation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/1/2011 End Date: 5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 5/12/2011 00:00 - 01:00 1.00 CASING P RUNPRD CONTINUE RIH W/LINER FROM 5600 FT. CORRECTION AT FIRST FLAG+9 FT. CORRECTION AT SECOND FLAG+5 FT. "NOTE-DID NOT CORRECT CTDS DEPTH* SLIGHT WT. BOBBLE AT 11800 FT AND SMOOTH TO BOTTOM. 01:00 - 02:45 1.75 CASING P RUNPRD TAG AT 14160 FT. P/U AND TAG AT SAME DEPTH TWO MORE TIMES AND STACK 1 OK# DOWN. 1:1 RETURNS. CALL TOWN ENGINEER AND DISCUSS RELEASING FROM LINER. P/U TO BALL DROP DEPTH. UP WT=60K#. P/U TO 14155 FT AND LAUNCH 5/8"BALL. BALL HEARD ROLLING OVER GOOSENECK AT 19 BBLS AWAY. RIH TO 14160 FT.AND STACK 7K#DOWN. SLOW DOWN TO 0.36 BPM/1820 PSI AT 30 BBLS AWAY. BALL ON SEAT AT 37.5 BBLS. PSI UP TO 4250#AND SEE LINER SHEAR. P/U TO B/O AT 14150 FT. UP WT. =40K#. SLACK BACK DOWN INTO LINER AND SET 10K#DOWN. 02:45 - 05:35 2.83 CASING P RUNPRD SWAP HOLE OVER TO KCL. 2.51 BPM AT 2780 PSI.LOSING—1.5-2 BPH KCL ALL THE WAY AROUND. 2.51 /2.46 BPM @ 2420 PSI. 05:35 - 09:20 3.75 CASING P RUNPRD FILL PITS W/KCL. 09:20 - 09:40 0.33 CASING P RUNPRD PJSM FOR CEMENT JOB 09:40 - 10:25 0.75 CASING P RUNPRD BATCH UP 35 BBLS OF 15.8 PPG CEMENT 10:25 - 12:00 1.58 CASING P RUNPRD PUMP 31 BBLS OF 15.8 PPG CEMENT INTO COIL @1.9 BPM/1800PSI-2100PSI -SD AND SWAP TO BIO-DISPLACE CEMENT W/55 BBLS OF BIO @ 2.4 BPM/LEAVING 2BBLS OF CEMENT ABOVE TOP OF LINER-WT CHECK WAS 39K @ 14150'-PU TO 14137.5'-SET BACK DOWN W/1 OK AND PSI UP TO 720#TO I,0 LAUNCH PEE-WEE DART-DART LANDED IN ` LWP AND HELD @ 370#-PU TO 14138'AND SIDE EXHAUST 2 BBLS OF CEMENT AND BIO- OPEN CHOKE AND BLED OFF PSI-RIH AND STACK 10K @14149.6'-CLOSE CHOKE AND PSI UP TO 3100 PSI TO LAUNCH LWP- DISPLACE LWP @ 2BPM @ 1970 PSI 1.91 IN/ 1.82 OUT-LAND DART W/2500PS1 @ 25BBL- PSI UP TO 2900#AND HOLD FOR 5 MINUTES- OPEN CHOKE AND BLEED OFF PSI-FLOATS HOLDING 12:00 - 14:00 2.00 CASING P RUNPRD POOH W/COIL&LINER RUNNING TOOL- FLUSHED LINES IN REEL HOUSE. 14:00 - 14:30 0.50 CASING P RUNPRD PJSM AND LAY DOWN LINER RUNNING TOOLS 14:30 - 14:40 0.17 CASING P RUNPRD TAG UP @ SURFACE AND FLOW CHECK WELL-OK 14:40 - 15:15 0.58 CASING P RUNPRD POP OFF WELL AND SB INJECTOR 15:15 - 15:45 0.50 CASING P RUNPRD LOAD OUT LINER RUNNING TOOLS 15:45 - 17:00 1.25 CASING P RUNPRD RU TOOLS AND FLUSH BOP STACK Printed 5/25/2011 4:09:55PM North America -ALASKA-BP Page 3 of 9 • Operation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/1/2011 End Date:5/17/2011 X3-00YL4-C(1,108,334.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 18:00 1.00 BOPSUR P RUNPRD PT MASTER AND SWAB VALVE INDEPENDENTLY TO 250 PSI LOW/3500 PSI HIGH IN ORDER TO MEET BREAKING CONTAINMENT REQUIREMENTS FOR OPENING BOP DOORS AND INSPECTING RAMS. BLOW DOWN STACK. 18:00 - 18:45 0.75 BOPSUR P RUNPRD CREW C/O. PJSM FOR OPENING BOP DOORS& INSPECTING RAMS-DISCUSS WORKING W/ PRESSURE,DROPPED OBJECTS,WORKING AT HEIGHTS,AND PROPER LO/TO PROCEDURES. 18:45 - 20:45 2.00 BOPSUR P RUNPRD REMOVE BOP DOORS AND INSPECT RAMS. C/O BLIND/SHEARS BLADE SEAL,2-3/8" UPPER COMBI'S TOP SEAL, 2-3/8"X 3-1/2" VBR'S TOP SEAL AND FRONT PACKER. 20:45 - 21:00 0.25 BOPSUR P RUNPRD FUNCTION TEST RAMS-GOOD. 21:00 - 23:00 2.00 BOPSUR P RUNPRD PJSM FOR TESTING ROPE. FILL STACK AND MANIFOLD LINES. SHELL TEST STACK-250 PSI LOW/3500 PSI HIGH. SMALL LEAK SEEN AT DOORS AT HIGH PSI. BLEED OFF PSI AND RE-SECURE DOORS. RE-TEST-GOOD. 23:00 - 00:00 1.00 BOPSUR P RUNPRD PEFORM BI-WEEKLY BOPE TESTAS PER AOGCC REGS,ADWOP,AND PTD. ALL TEST TO 250 PSI LOW/3500 PSI HIGH. HOLD AND CHART EACH TEST FOR 5 MIN. TEST WITNESSED BY JOHN CRISP W/ AOGCC. 5/13/2011 00:00 - 06:30 6.50 BOPSUR P RUNPRD CONTINUE W/BI-WEEKLY BOPE TEST. ANNULAR TESTED TO 250 PSI LOW/2500 PSI ^°p • HIGH. 1 ALL OTHER TESTS TO 250 PSI LOW/3500 PSI HIGH. HOLD AND CHART EACH TEST FOR 5 MIN. TEST WITNESSED BY JOHN CRISP W/ AOGCC. TESTED GAS ALARMS. 06:30 - 08:00 1.50 BOPSUR P RUNPRD PU INJECTOR -STAB ON WELL AND TEST INNER REEL VALVE AND PACK OFF 08:00 - 09:00 1.00 EVAL P RUNPRD CEMENT AT 2000#COMPRESSIVE STRENGTH -TESTLINER LAP TO 200 PSI LOW AND 2400 PSI HIGH-300 PSI LEAK OFF IN 15 MINUTES- PUMP UP AGAIN WITH SAME RESULTS- DISCUSS W/WTL AND DECIDE TO PROCEED W/LTP CONTINGENCY 09:00 - 10:30 1.50 EVAL P OTHCMP RU FLOOR TO PU AND RUN 1 1/4"CSH FOR CLEANOUT/LOGGING RUN 10:30 - 11:00 0.50 EVAL P OTHCMP PJSM W/SLB LOGGER TO DISCUSS HAZARDS OF HANDLING RADIOACTIVE SOURCE 11:00 - 11:30 0.50 EVAL P OTHCMP MU SLB MGNI_LOGGIN.GTOOL AND CLEAN OUT BHA Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 4 of 9 • Operation Summary Report Common Well Name: 02-21 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/1/2011 End Date:5/17/2011 X3-00YL4-C(1,108,334.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 16:00 4.50 EVAL P OTHCMP PJSM-PU AND RUN IN HOLE W/CLEAN OUT/ LOGGING BHA#11: RERUN 2.3"HCC D331 MILL,2 1/8"MTR,XO,2 JTS 1 1/4"CSH,XO, MCNL,XO PORTED-1/2", DISC-5/8",XO, 130JTS 1 1/4CSH,XO,DISC-3/4", DBPV,XO, 2JTS 2 3/8"PH6, BTT CTC. BHA LENGTH:4227.06' 16:00 - 16:30 0.50 EVAL P OTHCMP PJSM-PU AND STAB INJECTOR 16:30 - 16:45 0.25 EVAL P OTHCMP MU SLB MEMORY LOGGER CABLES AND TEST 16:45 - 18:45 2.00 EVAL P OTHCMP RIH W/BHA#11 TO C/O 2-7/8"LINER AND LOG GR/CCL/MCNL. RIH @ 90 FPM DOWN TO 10650 FT. 18:45 - 20:00 1.25 EVAL P OTHCMP SLOW DOWN TO 30 FPM AND BEGIN LOGGING DOWN FROM 10650 FT. CLEAN ALL THE WAY DOWN. 20:00 - 21:15 1.25 EVAL P OTHCMP OUT MM DENSITY @ 8.57 PPG. TAKE 12 BBLS OF CONTAMINATED CEMENT OUTSIDE TO CB BEFORE RETURNS CLEAN UP AND ARE BROUGHT BACK INSIDE. 20:15-PUMP 30 BBL PERF PILL AND CONTINUE RIH LOGGING AT 30 FPM.TAG AT 14115 FT UNCORRECTED. CONTINUE CIRC. PERF PILL AROUND WHILE SLOWLY PUH. 21:15 - 22:15 1.00 EVAL P OTHCMP POOH LOGGING UP AT 60 FPM WHILE LAYING IN PERF PILL. PVT=241 BBLS. PAINT EOP FLAG @ 9700 FT. (13927 FT CTDS) 22:15 - 22:30 0.25 EVAL P OTHCMP LOG UP TO 10650 FT AND STOP. FLOW CHECK WELL-NO FLOW. 22:30 - 00:00 1.50 EVAL P OTHCMP CONT. POOH W/BHA#11. 85-90 FPM. PVT=216 BBLS. 5/14/2011 00:00 - 00:15 0.25 EVAL P OTHCMP TAG UP AND SHUT DOWN PUMPS. FLOW CHECK WELL-NO FLOW. 00:15 - 00:40 0.42 EVAL P OTHCMP PJSM FOR UNSTABBING INJ.AND UD BHA #11. 00:40 - 04:45 4.08 EVAL P OTHCMP UNSTAB INJ.AND SET DOWN ON LEGS. BEGIN UD BHA#11. STAND BACK DOUBLES OF 1-1/4"CSH IN DERRICK. FILL HOLE EVERY 15 STANDS PULLED. 03:00-PINHOLE FOUND IN JT OF 1-1/4"CSH 17 STANDS IN. 04:45 - 05:00 0.25 EVAL P OTHCMP PJSM FOR L/D LOGGING TOOLS. DISCUSS RADIOACTIVE SOURCE AND HANDLING PROCEDURES. 05:00 - 06:00 1.00 EVAL P OTHCMP L/D LOGGING TOOLS AND OFFLOAD SAME. 06:00 - 12:45 6.75 EVAL P OTHCMP DOWNLOAD LOGGING DATA-EVALUATE AND SEND TO TOWN-ALL DATA APPEARS TO BE GOOD BUT DEPTHS COMING IN-45' FROM EXPECTED-PBTD NOW @ 14098' - WORD FROM TOWN TO DROP 2 GUNS FROM BOTTOM OF STRING AND RUN THE REST AS PROPOSED-CONDUCT WELL FLOWING DRILL W/AAR 12:45 - 13:15 0.50 PERFOB P OTHCMP PREP FLOOR AND PJSM TO PU PERFORATING GUNS Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 5 of 9 • Operation Summary Report Common Well Name:02-21 AFE No Event Type: COM-ONSHORE(CON) Start Date:5/1/2011 End Date:5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:15 15:15 2.00 PERFOB P OTHCMP PU,(57)2.00"6 SPF_?QQ PJ PERF GUNS- 802.34'LOADED,412.84'BLANK 15:15 - 15:30 0.25 PERFOB P OTHCMP PJSM TO PU 1 1/4"CSH WORKSTRING 15:30 - 18:30 3.00 PERFOB P OTHCMP MU TO E-FIRE HEAD AND PU AND RIH W/88 JTS OF CSH BHA LENGTH 4047.53FT PVT 197BBLS. 18:30 - 21:00 2.50 PERFOB P OTHCMP M/U INJECTOR. RIH WITH CTB CONVEYED PERF GUNS. 80 FPM.PUMPING.30 BPM. EOP FLAG AT 9700 FT.CORRECT TO 13736.5 ?' FT FROM 13753.3 FT. -16.8 CORRECTION. CONTINUE RIH TO 13795 FT.P/U WT 47K. 11 FPM,.3 BPM. PVT 252. 21:00 - 21:30 0.50 PERFOB P OTHCMP RIH TAG PBTD AT 14105 FT.TAG 2 TIMES. P/U TO WT 14100.5 FT. R/U TO FIRE PERF GUNS. HOLD PJSM WITH ALL CREWS. RUN GUN FIRING SEQUENCE @ PER SLB. P/U SLOWLY FIRE GUNS ON DEPTH AT 14093 FT.PVT 253 BBLS. GUNS FIRED AT 21:23 HRS. BOTTOM SHOT AT 14092 FT.TOP SHOT AT 12900 FT. 21:30 - 22:45 1.25 PERFOB P OTHCMP POH 47 FPM HOLDING 150 PSI WHP WITH CHOKE.PVT 248 BBLS. PUMPING 1.4 BPM WITH RETUNS.WELL TOOK 5 BBLS. CONTINUE POH HOLDING 100 PSI WHP. HOLE TAKING 2-3 BPH WHILE HOLDING 100 PSI WHP. POH TO 10259 FT. 22:45 - 23:00 0.25 PERFOB P OTHCMP FLOW CHECK WELL. HOLE TAKING 2 BPH. PVT 212 BBS. 23:00 - 00:00 1.00 PERFOB P OTHCMP POH WITH CHOKE FULLY OPEN. PUMPING 1.2 BPM. 1050 PSI. 85 FPM. 5/15/2011 00:00 - 00:20 0.33 PERFOB P OTHCMP POH WITH 2 INCH PERF GUN BHA. TAG UP AT SURFACE. 00:20 - 00:45 0.42 PERFOB P OTHCMP FLOW CHECK WELL.WELL TAKING 2 BPH. PVT 175 BBLS. PJSM FOR STANDING BACK 1 1/4"CSH. STAND BACK INJECTOR. 00:45 - 02:30 1.75 PERFOB P OTHCMP R/U, POH AND STAND BACK 44 STDS 1 1/4" CSH. WELL TAKING 2 BPH. 02:30 - 02:50 0.33 PERFOB P OTHCMP HELD KICK DRILL WHILE POH WITH 1 1/4" CSH. GOOD RESPONSE TIME DEPLOYING SAFEY JT.AND SECURING WELL. HELD AAR FOR DRILL. DISCUSSED ALWAYS TO LET THE DRILLER KNOW WHERE YOU ARE AT AT ALL TIMES. ESPECIALLY WHEN IN HI NOISE LEVEL AREAS. GOOD INTERACTION FROM AAR WITH CREW. 02:50 - 03:30 0.67 PERFOB P OTHCMP CONTINUE POH. 03:30 - 07:45 4.25 PERFOB P OTHCMP PJSM- UD PERF GUNS-ALL GUNS FIRED 07:45 - 11:10 3.42 PERFOB P OTHCMP LOAD OUT TOOLS AND PERF GUNS AND PREP FLOOR FOR RUNNING LTP Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 6 of 9 Operation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/1/2011 End Date: 5/17/2011 X3-00YL4-C(1,108,334.00) Project:Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:10 - 11:45 0.58 ZONISO P RUNPRD PU AII0.13UNNING,BHA STRAP/DRIFT AND SET IN PIPESHED 11:45 - 12:45 1.00 ZONISO P RUNPRD PJSM-PU LTP BHA AND RIH 12:45 - 13:30 0.75 ZONISO N SFAL RUNPRD CT REEL BRAKE WAS RELEASED AND INJECTOR STARTED TO TIP TOWARD PIPE SHED-SLOWLY MOVED UNTIL GOOSENECK CAME IN TO CONTACT WITH THE CATTLE CHUTE-BRAKE RE-APPLIED AND ALL MOVEMENT STOPPED WITH INJECTOR LEANING @ 20 DEGREE ANGLE-ALL OPERATIONS SUSPENDED AND AREA SECURED-NOTIFICATIONS MADE TO OPS SUPT,WTL,ODE,AND HSE 13:30 - 15:30 2.00 ZONISO N SFAL RUNPRD W/O BP,SLB SUPERVISORS AND HSE TO CONDUCT L2RA TO DETERMINE PLAN FORWARD TO MITIGATE RISKS ASSOCIATED WITH GETTING THE INJECTOR BACK ON ITS STANDS-PERFORM L2RA AND PRE-JOB MEETING WITH CREWS 15:30 - 16:00 0.50 ZONISO N SFAL RUNPRD CONDUCT SEAMLESS OPERATION TO GET INJECTOR BACK VERTICAL ON ITS STANDS. 16:00 - 16:15 0.25 ZONISO N SFAL RUNPRD CONDUCT AN AAR OF THE OPERATION 16:15 - 18:45 2.50 ZONISO N SFAL RUNPRD W/O SCHUMBERGER TO CHECK OUT THEIR INJECTOR AND DRILLERS CONTROL PANEL. BOTH INJECTOR AND OPS CONTROL PANEL ARE FOUND TO BE IN GOOD WORKING CONDITION. 18:45 - 19:15 0.50 ZONISO N SFAL RUNPRD PJSM FOR CUTTING COIL. P/U INJECTOR AND CUT 28 FT OF COIL TO REMOVE POENTIAL FATIGUED SPOT. 19:15 - 20:15 1.00 ZONISO N SFAL RUNPRD PREP COIL AND RE-HEAD BOT CTC. PULL TEST TO 35K#AND PT TO 4000 PSI- GOOD. 20:15 - 21:00 0.75 ZONISO P RUNPRD PJSM FOR P/U INJ. P/U INJECTOR AND STAB ON. 21:00 - 23:00 2.00 ZONISO P RUNPRD RIH W/WEATHERFORD 5-1/2"ER PAKER SETTING BHA. BHA OAL=136.11 FT. RIH W/PKR @ MIN RATE.0.35 BPM/110 PSI. PVT= 137 BBLS. 23:00 - 23:25 0.42 ZONISO P RUNPRD UP WT.@ 10250 FT=41K#. RIH WT. =22K#. SET DOWN 5K#@ 10303 FT. (DEPTH IS CONSISTENT W/PREVIOUS DEPTH CORRECTIONS OF-30 FT ON INITIAL TIE-INS) P/U TO BALL DROP DEPTH @ 10283 FT. DROP 5/8"BALL. 23:25 - 00:00 0.58 ZONISO P RUNPRD RIH AND SET BACK DOWN @ SAME DEPTH AS BEFORE. P/U TO BREAK-OVER+1 FT @ 10300 FT. CIRC. BALL AROUND AT 1.5 BPM. BALL HEARD ROLLING IN REEL BUT NEVER HEARD GOING OVER GOOSENECK. SLOW DOWN TO 0.8 BPM @ 40 BBLS. Printed 5/25/2011 4:09:55PM North America-ALASKA-BP Page 7 of 9 • Operation Summary Report Common Well Name: 02-21 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/1/2011 End Date:5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum:47: 21 4/13/1982 00:00@64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/16/2011 00:00 - 00:45 0.75 ZONISO P RUNPRD CONT.CIRC.5/8"BALL TO SEAT. 00:15-AFTER FULL COIL VOL. BALL NOT ON SEAT. INCREASE RATE AND LISTEN FOR BALL IN REEL HOUSE-BALL HEARD. 00:30-BALL HEARD GOING OVER GOOSENECK. 00:45 - 01:15 0.50 ZONISO P RUNPRD BALL ON SEAT. PSI UP TO 4600#W/O SEEING SHEAR. (PINNED FOR 3200 PSI) BLEED OFF PSI AND PSI UP AGAIN. PRESSURE HOLDING STEADY. DISCUSS OPTIONS W/WEATHERFORD HAND. BLEED OF PSI AND P/U CLEAN. RUN BACK DOWN AND SET DOWN 7K#3 FT HIGHER THAN INITIALLY AT 10300 FT. 01:15 - 03:45 2.50 ZONISO P RUNPRD PJSM FOR POOH W/LTP SETTING BHA AND STILL POTENTIALLY HAVING PACKER ON. POOH @ 60 FPM. PUMPING AT 0.6-0.7 BPM ACROSS THE TOP WHILE HOLDING—100 PSI WHP. PVT= 182 BBLS. 03:45 - 04:00 0.25 ZONISO P RUNPRD TAG UP AT SURFACE. FLOW CHECK-NO FLOW. 04:00 - 04:20 0.33 ZONISO P RUNPRD PJSM FOR UD LTP SETTING BHA._DISCUSS POSSIBILITY OF TRAPPED PRESSURE IN SETTING TOOL,WELL CONTOL,AND DROPPED OBJECTS WHEN OFFLOADING TOOLS. 04:20 - 06:00 1.67 ZONISO P RUNPRD UNSTAB INJ.AND UD LTP SETTING BHA. SETTING TOOL HAS FUNCTIONED. PJSM FOR OFFLOADING SETTING TOOL AND • CLEARING FROM RIG FLOOR. 06:00 - 06:30 0.50 ZONISO P RUNPRD CREW C/O. DISCUSS CURRENT OPS AND MAKE RIG ROUNDS AND CHECKS. 06:30 - 06:45 0.25 ZONISO P RUNPRD PJSM FOR SLIP AND CUTTING DRILLING LINE. 06:45 - 09:15 2.50 ZONISO P RUNPRD SLIP AND CUT DRILL LINE. 09:15 - 11:15 2.00 ZONISO P RUNPRD LOAD SETTING TOOL ONTO WEATHERFORD TRAILER TO TAKE BACK TO SHOP. WAIT FOR WEATHERFORD TO RETURN W/ TEST PLUG FOR 5-1/2"LTP AND BRING TOOLS UP BEAVER SLIDE. 11:15 - 11:30 0.25 ZONISO P RUNPRD PJSM FOR M/U 5-1/2"LTP TEST PLUG BHA. 11:30 - 12:15 0.75 ZONISO P RUNPRD M/U 5-1/2"WEATHERFORD LTP TEST PLUG ASSEMBLY. P/U AND STAB INJ. 12:15 - 14:30 2.25 ZONISO P RUNPRD RIH W/TEST PLUG @ 0.5 BPM. PVT= 113 BBLS. 14:30 - 15:00 0.50 ZONISO P RUNPRD WT CHECK @ 10000 FT. UP WT. =40K# DOWN WT. =22K# 15:00 - 15:15 0.25 ZONISO P RUNPRD SET DOWN AND STING INTO 5-1/2"PKR AT 10248 FT UNCORRECTED. STACK 6K#DOWN. HOLD PJSM FOR TESTING LTP. Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 8 of 9 • Operation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/1/2011 End Date: 5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47: 21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:15 - 16:30 1.25 ZONISO P RUNPRD PRESSURE UP BACKSIDE THRU KILL LINE AND BEGIN PT LTP. LOW PT AT 300 PSI GOOD. PROCEED TO HIGH PT. PSI UP TO 2483 PSI AND PSI BLEEDS OFF TO 2200 PSI IN 7 MIN. PSI BACK UP TO 2500 AND STILL SEEING PRESSURE BLEED OFF. PSI UP ONE MORE TIME TO 2500 PSI AND PRESSURE BLEEDS OFF TO 2300 PSI AND THEN STABILIZES.HOLD FOR 30 MIN. DISCUSS RESULTS W/WTL AND GET OK TO PROCEED. UNSTING TEST PLUG AND BEGIN POOH. 16:30 - 18:45 2.25 ZONISO P RUNPRD CONT. POOH W/TEST PLUG BHA. TAG UP AT SURFACE. FLOW CHECK WELL- NO FLOW. POP OFF INJ. HOLD PJSM FOR UD BHA. 18:45 - 19:15 0.50 ZONISO P RUNPRD L/D TEST PLUG BHA. 19:15 - 19:45 0.50 DEMOB P POST M/U NOZZLE ON END OF COIL FOR FREEZE PROTECT. STAB ON INJ. 19:45 - 20:30 0.75 DEMOB P POST RIH W/NOZZLE TO 2500 FT. 20:00-LRS ON LOCATION. 20:30 - 21:15 0.75 DEMOB P POST PT LRS LINES TO 3500 PSI-GOOD. LINE UP PUMP FREEZE PROTECT. PUMP 60 BBLS OF 70 DEG F DIESEL AT 1.5 BPM. 21:15 - 22:00 0.75 DEMOB P POST POOH AT 70 FPM LAYING IN DIESEL FP 1:1. 22:00 - 22:30 0.50 DEMOB P POST TAG UP AT SURFACE. CLOSE MASTER AND SWAB. SPOT UP SLB N2 UNIT. 22:30 - 00:00 1.50 DEMOB P POST PJSM FOR BLOWING DOWN COIL. PUMP 50 BBLS FRESH WATER FOLLOWED BY 10 BBLS MEOH THRU COIL. TEST N2 LINES TO 4000 PSI-GOOD. 23:15-COME ON LINE W/N2 AT 1500 SCF AND 1360 PSI. TAKE RETURNS TO TIGER TANK. 23:30-SHUT DOWN N2 AND BLEED OFF PRESSURE THROUGH TT. 5/17/2011 00:00 - 01:00 1.00 RIGD P POST PJSM FOR PULLING COIL ACROSS. UNSTAB INJ.AND REMOVE NOZZLE. CUT OFF CTC. DRESS COIL AND INSTALL • INTERNAL GRAPPLE. 01:00-GREASE AND BPV CREW ON LOCATION. 01:00 - 02:30 1.50 RIGD P POST PULL COIL ACROSS AND SECURE TO REEL W/SHIPPING BAR. 02:30 - 03:30 1.00 RIGD P POST PJSM FOR REMOVING PACK-OFF AND SETTING DOWN INJ, DISCUSS DROPPED OBJECTS,GOOD COMMUNICATION,AND PINCH POINTS. UNBOLT PACK-OFF AND P/U INJ. SET INJ. DOWN ON FLOOR FOR RIG MOVE. ***INJ.LEGS BEING SENT OFF RIG FOR INSPECTION*** 03:30 - 03:45 0.25 WHSUR P POST PJSM W/BPV CREW FOR R/U LUBRICATOR AND SETTING BPV. Printed 5/25/2011 4:09:55PM North America-ALASKA- BP Page 9 of 9 • Gperation Summary Report Common Well Name:02-21 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/1/2011 End Date: 5/17/2011 X3-00YL4-C(1,108,334.00) Project: Prudhoe Bay Site: PB DS 02 Rig Name/No.: NORDIC 2 Spud Date/Time:6/2/2001 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292078100 Active Datum:47:21 4/13/1982 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:45 - 07:00 3.25 WHSUR P POST P/U LUBRICATOR TO RIG FLOOR AND M/U. FILL TREE WITH MEOH. ATTEMPT TO PT LUBRICATOR TO 250 PSI LOW/3500 PSI HIGH. HAVING TROUBLE GETTING A GOOD FLAT-LINE TEST SO CALL OUT GREASE CREW. SWAP OUT 2-3/8"CT REELS WHILE WAITING FOR GREASE CREW TO ARRIVE. GREASE CREW ARRIVES AND SERVICES TREE. 07:00 - 09:30 2.50 WHSUR P POST TEST LUBRICATOR AGAINST MASTER VALVE TO 250-PSI LOW/3500-PSI HIGH. HOLD AND CHART EACH TEST FOR 5-MINUTES. LUBRICATE IN BPV. LD LUBRICATOR. 09:30 - 11:30 2.00 WHSUR P POST FILL STACK WITH MEOH. TEST MASTER AND SWAB VALVES TO 250-PSI LOW/3500-PSI HIGH. HOLD AND CHART TESTS FOR 5-MINUTES 11:30 - 14:00 2.50 BOPSUR P POST OPEN BOP DOORS AND INSPECT RAMS. NO ISSUES NOTED. 2 BARRIERS FOR INSPECTION/ND ARE 1) TESTED MASTER VALVE AND 2)TESTED SWAB VALVE. HOLD AAR ON INSPECTING RAMS. 14:00 20:00 6.00 WHSUR P POST ND BOP STACK. NU TREE CAP. TEST TREE CAP TO 250-PSI LOW/3500-PSI HIGH FOR 5 CHARTED MINUTES PER TEST. NO VISIBLE LEAKS. SECURE WELL. T/IA/OA=BPV/0/0. RELEASE RIG AT 2000-HRS. Printed 5/25/2011 4:09:55PM • BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 02 02-21 - Slot 21 500292078100 02-21B Survey: MWD Survey Report - Geographic 13 May, 2011 0 bp • Mill BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Site: PB DS 02 MD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Well: 02-21 North Reference: True Wellbore: 02-21 B Survey Calculation Method: Minimum Curvature Design: 02-21B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37ft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 ft Longitude: 148°28'58.060 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.43 ° Well 02-21 API No 500292078100 Well Position +N/-S 0.00 ft Northing: 5,949,028.99 ft Latitude: 70°15'56.280 N +E/-W 0.00 ft Easting: 686,883.83 ft Longitude: 148°29'19.851 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 30.00 ft Wellbore 02-21B API No 500292078102 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (') (nT) BGGM2010 4/15/2011 21.71 80.98 57,659 Design 02-216 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,850.00 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (ft) (ft) (ft) (°) 34.00 0.00 0.00 146.92 Survey Program Date: 5/13/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,850.00 Continuous Gyro Survey(02-21) GYD-CT-CMS Gyrodata cont.casing m/s 10,858.50 14,184.00 MWD(02-21B) MWD MWD-Standard 5/13/2011 10:44:53AM Page 2 COMPASS 2003.16 Build 73 • WEI BAKER HUGHES Survey Report-Geographic QbP INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 47:21 4/13/1982 00:00©64.00ft(generic drillinc Site: PB DS 02 MD Reference: 47:21 4/13/1982 00:00©64.00ft(generic drillinc Well: 02-21 North Reference: True Wellbore: 02-21 B Survey Calculation Method: Minimum Curvature Design: 02-216 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,850.00 43.73 140.66 8,606.27 -3,544.63 4,078.18 5,945,586.90 691,048.50 70°15'21.408 N 148°27'21.214 W' TIP 10,858.50 43.72 140.66 8,612.41 -3,549.17 4,081.91 5,945,582.45 691,052.33 70°15'21.363 N 148°27'21.106 W KOP 10,881.40 47.07 140.66 8,628.49 -3,561.78 4,092.24 5,945,570.11 691,062.98 70°15'21.239 N 148°27'20.806 W 10,897.38 48.27 143.00 8,639.25 -3,571.06 4,099.54 5,945,561.00 691,070.50 70°15'21.148 N 148°27'20.593 W 10,917.14 48.26 146.50 8,652.41 -3,583.10 4,108.05 5,945,549.18 691,079.30 70°15'21.029 N 148°27'20.346 W 10,942.19 48.93 151.00 8,668.98 -3,599.16 4,117.79 5,945,533.37 691,089.44 70°15'20.871 N 148°27'20.063 W 10,960.57 49.91 154.00 8,680.94 -3,611.54 4,124.23 5,945,521.15 691,096.19 70°15'20.750 N 148°27'19.876 W 10,981.47 51.48 157.00 8,694.18 -3,626.26 4,130.93 5,945,506.61 691,103.25 70°15'20.605 N 148°27'19.681 W 11,000.23 52.31 160.00 8,705.76 -3,639.99 4,136.34 5,945,493.02 691,109.00 70°15'20.470 N 148°27'19.524 W 11,021.11 52.26 163.50 8,718.53 -3,655.67 4,141.51 5,945,477.47 691,114.55 70°15'20.315 N 148°27'19.374 W 11,040.24 51.71 166.39 8,730.32 -3,670.22 4,145.42 5,945,463.02 691,118.83 70°15'20.172 N 148°27'19.260 W 11,065.42 51.62 170.75 8,745.94 -3,689.57 4,149.34 5,945,443.77 691,123.22 70°15'19.982 N 148°27'19.147 W 11,114.28 49.68 178.76 8,776.95 -3,727.14 4,152.82 5,945,406.31 691,127.64 70°15'19.613 N 148°27'19.046 W 11,143.09 51.42 183.96 8,795.26 -3,749.36 4,152.28 5,945,384.08 691,127.65 70°15'19.394 N 148°27'19.062 W 11,175.15 52.04 179.58 8,815.12 -3,774.51 4,151.51 5,945,358.92 691,127.50 70°15'19.147 N 148°27'19.085 W 11,202.31 54.54 174.57 8,831.36 -3,796.24 4,152.63 5,945,337.23 691,129.17 70°15'18.933 N 148°27'19.053 W 11,232.37 58.02 167.19 8,848.06 -3,820.89 4,156.62 5,945,312.69 691,133.77 70°15'18.690 N 148°27'18.937 W 11,261.32 59.92 160.81 8,863.00 -3,844.71 4,163.47 5,945,289.04 691,141.20 70°15'18.456 N 148°27'18.738 W 11,290.06 59.96 155.70 8,877.40 -3,867.81 4,172.68 5,945,266.19 691,150.98 70°15'18.229 N 148°27'18.471 W 11,319.90 57.94 151.74 8,892.80 -3,890.72 4,183.99 5,945,243.56 691,162.85 70°15'18.003 N 148°27'18.142 W 11,349.57 57.43 156.29 8,908.66 -3,913.25 4,194.97 5,945,221.31 691,174.39 70°15'17.782 N 148°27'17.823 W 11,379.67 57.37 160.74 8,924.89 -3,936.84 4,204.25 5,945,197.96 691,184.26 70°15'17.550 N 148°27'17.553 W 11,418.15 57.85 168.93 8,945.52 -3,968.16 4,212.74 5,945,166.86 691,193.51 70°15'17.242 N 148°27'17.307 W 11,448.76 58.78 174.06 8,961.61 -3,993.91 4,216.58 5,945,141.22 691,198.00 70°15'16.988 N 148°27'17.196 W 11,478.22 60.02 177.00 8,976.61 -4,019.18 4,218.55 5,945,116.00 691,200.60 70°15'16.740 N 148°27'17.139 W 11,508.64 63.84 178.83 8,990.92 -4,046.00 4,219.52 5,945,089.22 691,202.23 70°15'16.476 N 148°27'17.111 W 11,535.57 66.83 179.59 9,002.16 -4,070.47 4,219.86 5,945,064.77 691,203.17 70°15'16.235 N 148°27'17.101 W 11,572.67 72.59 182.76 9,015.02 -4,105.24 4,219.13 5,945,029.99 691,203.30 70°15'15.894 N 148°27'17.123 W 11,598.61 75.42 179.03 9,022.17 -4,130.17 4,218.74 5,945,005.07 691,203.54 70°15'15.648 N 148°27'17.135 W 11,628.40 77.47 173.62 9,029.16 -4,159.05 4,220.60 5,944,976.24 691,206.12 70°15'15.364 N 148°27'17.081 W 11,656.72 78.86 168.85 9,034.97 -4,186.44 4,224.83 5,944,948.97 691,211.02 70°15'15.095 N 148°27'16.959 W 11,686.16 82.43 165.80 9,039.75 -4,214.77 4,231.20 5,944,920.80 691,218.10 70°15'14.816 N 148°27'16.774 W 11,717.04 84.29 161.22 9,043.33 -4,244.17 4,239.91 5,944,891.63 691,227.53 70°15'14.527 N 148°27'16.521 W 11,749.87 88.87 161.09 9,045.28 -4,275.18 4,250.49 5,944,860.90 691,238.88 70°15'14.222 N 148°27'16.214 W 11,780.08 89.51 166.65 9,045.71 -4,304.18 4,258.88 5,944,832.11 691,247.98 70°15'13.937 N 148°27'15.970 W 11,821.38 87.15 171.75 9,046.92 -4,344.72 4,266.62 5,944,791.78 691,256.72 70°15'13.538 N 148°27'15.746 W 11,851.21 86.78 171.36 9,048.49 -4,374.18 4,270.99 5,944,762.44 691,261.83 70°15'13.248 N 148°27'15.619 W 11,882.57 86.47 170.88 9,050.34 -4,405.11 4,275.82 5,944,731.64 691,267.42 70°15'12.944 N 148°27'15.479 W 11,912.43 86.99 171.78 9,052.04 -4,434.58 4,280.32 5,944,702.29 691,272.65 70° 15'12.654 N 148°27'15.349 W 11,945.14 86.68 172.99 9,053.85 -4,466.95 4,284.64 5,944,670.04 691,277.78 70°15'12.336 N 148°27'15.223 W 11,978.00 90.34 174.06 9,054.70 -4,499.59 4,288.35 5,944,637.51 691,282.29 70°15'12.015 N 148°27'15.116 W 12,012.88 89.94 174.56 9,054.62 -4,534.30 4,291.81 5,944,602.90 691,286.61 70°15'11.673 N 148°27'15.016 W 12,042.39 90.40 174.30 9,054.53 -4,563.67 4,294.67 5,944,573.61 691,290.20 70° 15'11.384 N 148°27'14.933 W 12,068.73 90.28 174.60 9,054.38 -4,589.88 4,297.22 5,944,547.47 691,293.40 70°15'11.127 N 148°27'14.860 W 12,097.25 90.58 175.62 9,054.16 -4,618.30 4,299.65 5,944,519.12 691,296.53 70°15'10.847 N 148°27'14.790 W 12,127.17 93.72 175.53 9,053.04 -4,648.10 4,301.96 5,944,489.39 691,299.58 70°15'10.554 N 148°27'14.723 W 12,164.42 93.26 174.93 9,050.77 -4,685.15 4,305.05 5,944,452.42 691,303.59 70° 15'10.190 N 148°27'14.634 W 12,193.96 91.84 175.58 9,049.46 -4,714.56 4,307.49 5,944,423.09 691,306.76 70°15'9.900 N 148°27'14.563 W 12,225.22 90.55 176.12 9,048.81 -4,745.73 4,309.75 5,944,391.98 691,309.79 70°15'9.594 N 148°27'14.498 W 12,255.03 90.49 176.99 9,048.54 -4,775.49 4,311.54 5,944,362.28 691,312.32 70°15'9.301 N 148°27'14.446 W 12,290.27 90.09 176.84 9,048.36 -4,810.68 4,313.44 5,944,327.16 691,315.09 70°15'8.955 N 148°27'14.392 W 12,320.03 90.40 177.19 9,048.23 -4,840.40 4,314.99 5,944,297.49 691,317.38 70°15'8.663 N 148°27'14.347 W 12,352.94 89.78 176.87 9,048.18 -4,873.26 4,316.69 5,944,264.68 691,319.90 70°15'8.339 N 148°27'14.298 W 5/13!2011 10:44.:53AM Page 3 COMPASS 2003.16 Build 73 • BAKER HUGHES Survey Report-Geographiciro)bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Site: PB DS 02 MD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Well: 02-21 North Reference: True Wellbore: 02-216 Survey Calculation Method: Minimum Curvature Design: 02-2113 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +Ei-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,383.00 89.48 177.54 9,048.37 -4,903.29 4,318.16 5,944,234.70 691,322.11 70°15'8.044 N 148°27'14.256 W 12,419.16 90.06 177.37 9,048.52 -4,939.41 4,319.76 5,944,198.63 691,324.61 70°15'7.689 N 148°27'14.210 W, 12,446.85 89.88 177.48 9,048.53 -4,967.07 4,321.01 5,944,171.01 691,326.54 70°15'7.417 N 148°27'14.174 W 12,476.53 90.09 177.11 9,048.54 -4,996.72 4,322.41 5,944,141.41 691,328.68 70°15'7.125 N 148°27'14.134 W 12,506.97 90.40 177.70 9,048.41 -5,027.13 4,323.79 5,944,111.04 691,330.81 70°15'6.826 N 148°27'14.094 W 12,536.55 90.40 177.71 9,048.20 -5,056.68 4,324.97 5,944,081.53 691,332.73 70°15'6.536 N 148°27'14.060 W 12,566.32 90.25 177.80 9,048.03 -5,086.43 4,326.14 5,944,051.82 691,334.63 70°15'6.243 N 148°27'14.027 W 12,599.52 89.48 177.28 9,048.11 -5,119.60 4,327.56 5,944,018.70 691,336.88 70°15'5.917 N 148°27'13.986 W 12,628.86 89.82 175.50 9,048.29 -5,148.88 4,329.41 5,943,989.48 691,339.45 70°15'5.629 N 148°27'13.933 W 12,661.77 89.48 177.57 9,048.49 -5,181.72 4,331.40 5,943,956.69 691,342.26 70°15'5.306 N 148°27'13.875 W 12,692.19 90.00 178.03 9,048.63 -5,212.12 4,332.57 5,943,926.33 691,344.18 70°15'5.007 N 148°27'13.842 W 12,727.57 90.28 179.03 9,048.54 -5,247.49 4,333.47 5,943,891.00 691,345.96 70°15'4.659 N 148°27'13.816 W 12,758.98 90.06 179.42 9,048.45 -5,278.90 4,333.90 5,943,859.62 691,347.17 70°15'4.350 N 148°27'13.804 W 12,788.84 89.97 179.28 9,048.44 -5,308.75 4,334.24 5,943,829.78 691,348.25 70°15'4.056 N 148°27'13.795 W 12,823.76 89.97 178.54 9,048.46 -5,343.67 4,334.90 5,943,794.89 691,349.78 70°15'3.713 N 148°27'13.776 W 12,851.21 89.75 178.02 9,048.53 -5,371.11 4,335.73 5,943,767.49 691,351.28 70°15'3.443 N 148°27'13.753 W 12,914.79 90.46 178.46 9,048.41 -5,434.65 4,337.68 5,943,704.01 691,354.81 70°15'2.818 N 148°27'13.697 W 12,978.64 90.00 177.32 9,048.16 -5,498.46 4,340.03 5,943,640.29 691,358.75 70°15'2.191 N 148°27'13.630 W 13,009.84 90.18 176.38 9,048.11 -5,529.61 4,341.74 5,943,609.19 691,361.23 70°15'1.884 N 148°27'13.580 W 13,038.33 90.49 175.55 9,047.94 -5,558.03 4,343.75 5,943,580.83 691,363.94 70°15 1.605 N 148°27'13.523 W 13,073.99 90.22 175.56 9,047.72 -5,593.58 4,346.51 5,943,545.36 691,367.59 70°15'1.255 N 148°27'13.443 W 13,107.75 89.75 175.85 9,047.73 -5,627.25 4,349.04 5,943,511.77 691,370.95 70°15'0.924 N 148°27'13.370 W 13,139,62 89.88 175.20 9,047.83 -5,659.02 4,351.53 5,943,480.07 691,374.22 70°15'0.611 N 148°27'13.298 W 13,167.54 90.00 175.07 9,047.86 -5,686.84 4,353.89 5,943,452.32 691,377.28 70°15'0.338 N 148°27'13.230 W 13,199.79 89.85 175.48 9,047.90 -5,718.98 4,356.55 5,943,420.26 691,380.74 70°15'0.022 N 148°27'13.153 W 13,230.24 91.75 175.91 9,047.48 -5,749.34 4,358.84 5,943,389.97 691,383.77 70°14'59.723 N 148°27'13.087 W 13,259.62 94.08 175.06 9,045.98 -5,778.59 4,361.15 5,943,360.79 691,386.81 70°14'59.435 N 148°27'13.020 W 13,290.40 94.76 176.63 9,043.61 -5,809.20 4,363.37 5,943,330.25 691,389.79 70°14'59.134 N 148°27'12.956 W 13,317.20 94.74 176.22 9,041.39 -5,835.85 4,365.04 5,943,303.64 691,392.12 70°14'58.872 N 148°27'12.908 W 13,349.29 94.33 175.10 9,038.85 -5,867.75 4,367.46 5,943,271.82 691,395.33 70°14'58.558 N 148°27'12.838 W 13,379.01 96.48 176.70 9,036.05 -5,897.26 4,369.57 5,943,242.37 691,398.18 70°14'58.268 N 148°27'12.777 W 13,401.97 97.00 179.18 9,033.36 -5,920.04 4,370.39 5,943,219.61 691,399.56 70°14'58.044 N 148°27'12.754 W 13,428.13 98.36 182.82 9,029.86 -5,945.96 4,369.94 5,943,193.70 691,399.75 70°14'57.789 N 148°27'12.767 W 13,460.18 99.58 186.73 9,024.86 -5,977.50 4,367.31 5,943,162.10 691,397.91 70°14'57.479 N 148°27'12.844 W 13,488.74 98.65 189.90 9,020.34 -6,005.40 4,363.23 5,943,134.11 691,394.52 70°14'57.205 N 148°27'12.963 W 13,517.64 94.66 189.79 9,016.99 -6,033.68 4,358.32 5,943,105.72 691,390.32 70°14'56.927 N 148°27'13.107 W 13,546.09 90.92 190.90 9,015.60 -6,061.62 4,353.22 5,943,077.66 691,385.91 70°14'56.652 N 148°27'13.255 W 13,573.85 88.74 188.82 9,015.69 -6,088.97 4,348.47 5,943,050.20 691,381.84 70°14'56.383 N 148°27'13.394 W 13,604.55 85.09 189.06 9,017.34 -6,119.25 4,343.70 5,943,019.82 691,377.83 70°14'56.085 N 148°27'13.533 W 13,639.16 84.90 186.59 9,020.36 -6,153.40 4,339.01 5,942,985.56 691,373.98 70°14'55.749 N 148°27'13.670 W 13,671.90 83.98 181.22 9,023.53 -6,185.90 4,336.79 5,942,953.02 691,372.57 70°14'55.430 N 148°27'13.735 W 13,700.28 83.77 178.27 9,026.56 -6,214.12 4,336.92 5,942,924.82 691,373.40 70°14'55.152 N 148°27'13.732 W 13,728.83 86.78 175.64 9,028.91 -6,242.52 4,338.43 5,942,896.46 691,375.62 70° 14'54.873 N 148°27'13.689 W 13,758.67 88.87 173.21 9,030.05 -6,272.20 4,341.33 5,942,866.87 691,379.25 70°14'54.581 N 148°27'13.605 W 13,800.19 87.94 162.15 9,031.21 -6,312.68 4,350.17 5,942,826.62 691,389.09 70°14'54.183 N 148°27'13.348 W 13,834.96 85.55 163.25 9,033.18 -6,345.82 4,360.49 5,942,793.75 691,400.23 70° 14'53.857 N 148°27'13.049 W 13,870.40 84.74 168.27 9,036.18 -6,380.04 4,369.17 5,942,759.76 691,409.76 70°14'53.520 N 148°27'12.797 W 13,900.02 85.73 171.50 9,038.64 -6,409.09 4,374.36 5,942,730.84 691,415.66 70°14'53.234 N 148°27'12.647 W 13,929.58 89.69 172.11 9,039.82 -6,438.32 4,378.57 5,942,701.73 691,420.60 70°14'52.947 N 148°27'12.525 W 13,964.47 90.77 175.80 9,039.68 -6,473.01 4,382.24 5,942,667.14 691,425.13 70° 14'52.606 N 148°27'12.419 W 13,994.77 90.95 179.52 9,039.23 -6,503.28 4,383.48 5,942,636.92 691,427.12 70°14'52.308 N 148°27'12.383 W 14,025.09 89.79 182.30 9,039.03 -6,533.59 4,382.99 5,942,606.61 691,427.39 70°14'52.010 N 148°27'12.398 W 14,055.12 88.19 184.94 9,039.56 -6,563.55 4,381.10 5,942,576.61 691,426.24 70°14'51.715 N 148°27'12.453 W 14,091.94 88.44 188.98 9,040.64 -6,600.08 4,376.64 5,942,539.99 691,422.69 70°14'51.356 N 148°27'12.583 W 14,126.48 90.77 192.70 9,040.88 -6,633.99 4,370.15 5,942,505.92 691,417.04 70°14'51.022 N 148°27'12.773 W 5/13/2011 10:44:53AM Page 4 COMPASS 2003.16 Build 73 ERII BAKER HUGH'S Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-21 -Slot 21 Project: Prudhoe Bay TVD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Site: PB DS 02 MD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drillinc Well: 02-21 North Reference: True Wellbore: 02-21 B Survey Calculation Method: Minimum Curvature Design: 02-21B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 14,184.00 90.77 192.70 9,040.11 -6,690.10 4,357.50 5,942,449.52 691,405.79 70° 14'50.471 N 148°27'13.141 W TD 5/13/2011 10:44:53AM Page 5 COMPASS 2003.16 Build 73 TREE= ` FMC GEN II WELLHEAD= FMC 'ACTUATOR= BAKER PJC DRAF . 02-21 B COOL_ ,E BAD LL ANGLE<70° 11555' iik KB.ELEV= 64' 1 r BF.ELEV= 7 20"CONDUCTOR, -I 80' I, KOP= 2900' Max Angle=100•@ 13460' 91.54'H-40. 2198' —5-1/T CAM BA L-O SSSV NIP,ID=4.562" Datum MD= 11263' ID=19.124" 0 GAS LIFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2899 2897 10 CA DOME RK 16 05/28/11 13-3/8"CSG,72#,L-80 BTC, ID=12.347" 1 2537' 2 5232 4766 49 CA DMY RK 0 08/20/10 3 7172 6028 51 CA SO RK 22 05/28/11 19-SIS"CSG,47#,L-80 BTC XO-O S00-95 BTC - 9577' I--->.< G 4 8520 6902 47 CA DMY RK 0 05/02/82 J >.< 5 9286 7447 42 CA DMY RK 0 05/02/82 Minimum ID =2.37" @ 11759' 6 9356 7499 42 CA DMY RK 0 05/02/82 3-3/16" X 2-7/8" LNR XO 7 9745 7792 41 CA DMY RK 0 05/02/82 8 9819 7848 41 CA DMY RK 0 05/02/82 5-1/2"WRD ER PKR,ID=2.441"(05/16/11) — 10230' 9 10130 8083 41 CA DMY RK 0 05/02/82 10 10202 8137 41 CA DMY RK 0 05/02/82 5-1/2"TBG-PC, 17#,L-80 8RD AB MOD. 1 10266' 1 10266' -15-1/2"BAKER PBR ASSY. ID='? .0232 bpf,ID=4.892" ' i _ 10281' —j9-5/8"X5-l/2"BKR SA B PKR ID=4.012" 2-7/8"LNR SPACER PIPE,6.4#, L-80 STL ' ......- 10282' -3.70"BKR DEPLOYMENT SLV, 1D=3.00" 0058 bpf, ID=2.441" \ \ 10287' -{7"MILLOUT EXTENSION,ID=7' 10293' 15-1/2"X 4-1/2"XO. ID=3.958" 10305' 13-1/2"OTIS X N:P,ID=2.813" TOP OF 7"LNR —{ 10317' L10317' —19-5/8"X 7"BKR LNR HGR w/TIEBK SLV 3-1/2"LNR,9.2#,L-80 STL,.0087 bpf,ID=2.992" 1 10337' 1 10337' 13-1/2"X 3-3/16"XO,ID=2.786" f - . 10353' —4-1/2"CAM DB-6 LANDING NIP.ID=3.813" 10364' -4-1/2"BKR SHEAROUT SUB BEHIND 41/2"TBG-PC, 12.6#,N-80,.0152 bpf,ID=3.958" -i 10366' ‘'/ 10366' -14-1/2"TUBING TAIL,ID=3.958" CT LNR 10374' H ELMD TT LOGGED 05/05/82 [9-5/8"CSG,47#,S00-95 BUTT, ID=8.681" -- 10592' FA X. L"LNR,29#,L-80 BUTT,.0371 bpf, ID=6.184" 1 -10817 7"BKR GEN II WHIPSTOCK(04/30/11) 1 10858' :� �!• - �� ** MILLOUT WINDOW(02-21B) 10863'-10817' PERFORATION SUMMARY •*1 REF LOG:SLS MEM LEE CCU GRI TNF/TNN ON 5/13/11 �•y ANGLE AT TOP PERF: 90'@ 12900' Note: Refer to Production DB for historical pert data " SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 12900-13330 0 05/15!11 ‘ 11759' --{3-3/16"X 2-718"XO,ID=2.377" 2" 6 13720- 14092 0 05/15/11 I 37-3/16"LNR,6.2#,L-80 TCII, .0076 bpf,ID=2.800" 11759' I PBTD 1 14098' • 2-7/8"LNR,6.4#,L-80 STL, .0058 bpf,ID=2.441" H 14138' — •4 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/02/82 ORIGINAL COMPLETION WELL: 02-21 B 06/11/01 N3ES CTD SIDETRACK(02-21A) PERMIT No:/1110330 05/17/11 NORDIC 2 CTD SIDETRACK(02-21B) API No: 50-029-20781-02 05/27/11 PJC DRLG DRAFT CORRECTIONS SEC 36,T11 N,R14E,2513'FNL&102'FWL 05/29/11 SET/PJC GLV C/O(05/28/11) BP Exploration(Alaska) 27, r1r1 raASEAN PARNELL,GOVERNOR 0 GAS OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box,169912 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, OBU 02-21B BP Exploration (Alaska), Inc. Permit No: 211-033 Surface Location: 2153' FNL, 5177' FEL, SEC. 36, T11N, R14E, UM Bottomhole Location: 3545' FNL, 791' FEL, SEC. 01, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 4 Daniel eamount, Jr. Cha'. DATED this day of March, 2011. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEI ''1••• ALA, OIL AND GAS CONSERVATION COMP ION PERMIT TO DRILL MAR ® 011 ..r-..2-// 20 AAC 25.005 e • i g�] 33180 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Winj 0 Single Zone ��^'""�`�'�ilM �'"F"'�!' !'1 ❑ Drill ®Redrill 0 Stratigraphic Test ❑Development Gas ❑Service-Supply 0 Multiple Zone 0 Coalbed 4NCIr1W lt3 Hydrates ❑ Re-Entry 0 Exploratory ❑Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number. BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 02-21B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 14175' TVD 8978'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028308&028311 2153'FNL,5177'FEL,SEC. 36,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 812'FNL,981'FEL,SEC. 1,T10N, R14E, UM April 10,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 3545'FNL, 791'FEL,SEC. 1,T10, R14E, UM 2560 26500' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 64.00 feet 15.Distance to Nearest Well Open Surface: x- 686884 y-5949029 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 880' 16.Deviated Wells: Kickoff Depth: 10882 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 95 degrees Downhole: 3249 Surface: 2369 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing . Weight Grade Coupling Length MD ND MD ND (including stage data) 3-3/4" 3-3/16"x 2-7/8" 6.2#/6.5# L-80/13Cr80 STL 3837' 10338' 8239' 14175' 8978'ss 179 sx 15.8 ma Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 12408' 9039' 11300'/11550'/11900' 12338' 9038' None Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 20" 520 sx AS II 80' 80' Surface 2537' 13-3/8" 2200 sx Fondu&400 sx PFC 2357' 2357' Intermediate . Production 10597' 9-5/8" 500 sx Class'G' 10597' 8427' Liner 992' 7" 425 sx Class'G' 10317'-11309' 8223'-8940' Liner 2073' 3-1/2'x 2-7/8" 82 sx Class'G' 10298'-12371' 8209'-9038' Perforation Depth MD(ft): 11236'-12300' Perforation Depth ND(ft): 888T-9037' 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoin• is true and rect. Contact Cody Rymut,564-5452 Printed Name John ,L]jr• Title Engineering Team Leader / / Prepared By Name/Number Signature Phone 564-4711 Date 7 1/ Elizabeth Barker,564-5674 Commission Use Only Permit To Drill/ _ API Number Permit,q rovr l Date: See cover letter for Number a 33 50-029-20781-02-00 : 111 l other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: I Other 44 3 500 is,.. 50 P / /e 5 /- Samples Req'd: ❑Yes NJ No Mud Log Req'd: 0,f Yes L'No * Z 50O S` n 4.4A4-r' /t 3-(�netn) H2S Measures: Yes 0 No Directional Survey Req'd: 6 Yes 0 No ____32-7,7L, Date `•, APPROVED BY THE COMMISSION ,COMMISSIONER Form 10-401 Rev07/2009 This permit is valid r 24 mof epA20 AAC 25.005(g)) Submit In Duplicate l DS 02-21B - Coiled Tubin, illing To: Alaska Oil & Gas Conservation Commission From: Cody Rymut by CTD Engineer Date: February 17, 2011 Re: 02-21 B Application for Permit to Drill Request CTD Drill and Complete 02-21B program: Spud April 10th, 2011 Pre-Rig Work: (scheduled to begin April 1st, 2011) 1. S Pull DSSSV 2. E Set CIBP at 10,920'MD / 3. E Jet Cut LNR @ 10,905'MD 4. W Torque LDS 5. V PT MV, SV, WV, add additional valve to IA due to TxIA communication 6. 0 Blind and bleed lines 7. 0 Remove well house, level pad 8. V Set TWC 24hrs prior to rig arrival Rig Work: (April 10th, 2011) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Pull 607' of 3-1/2"tubing. 0 Li/14r ( ,OZI - lv`IOS 'µu) 3. Set 4-1/2" x 7.00" through tubing whipstock 4. Mill 3.8" window at 10862'MD and 10' of rathole. Swap the well to mud. 5. 3 " OH, ' ' n 6. DrillDrill Lateral:Build: 4.125.75 " OH883, 2430MD'MD(12 (12deg/100deg/100pla' planned)ned) with with resresistivityistivity ' 1hi5 7. Run 3-3/16" x 2-7/8" L-80 liner leaving TOL at 10,338'MD • rTD 8. Pump primary cement leaving TOC at 10750'MD, 37 bbls of 15.8 ppg liner cmt planned- 9. Cleanout liner and MCNUGR/CCL log 10.Test liner lap to 2400 psi. 11.Perforate liner per asset instructions (-800') ' 12.Freeze protect well, RDMO Post-Rig Work: 1. 0 Re-install welihouse and FL's. 2. S Generic GLV's, run DSSSV 3. T ASRC Flow Back Test February 17, 2011 DS 02-21B — Coiled Tubini filling Mud Program: • Well kill: 8.6 ppg seawater/ brine • Milling/drilling: 8.6 ppg Geo-vis or biozan for milling, new Geo-vis for drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole Size: Build Section: 3.75" Lateral Section: 3.75" Casing Program: • 3-3/16", L-80 ST-L 6.2# 10338' MD— 11800' MD • 2-7/8", 13Cr80 ST-L 6.5# 11800' MD— 14175' MD • A minimum of 37 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 10750'MD) Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 2,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 95 deg. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property line—26500' • Distance to nearest well within pool —880' Anticollision Summary • 01-20 center to center distance is 885.89'. 01-20 current status is shut-in oil producer. Logging • MWD directional, Gamma Ray, and Resistivity will be run over all of the open hole section. • A cased hole GR/CCUCNL log will be run. Hazards • The maximum recorded H2S level on DS A is 24 ppm on well 02-27A (4/23/2010). • Lost circulation risk is Low. The planned trajectory does not cross any mapped faults, but it does cross over a graben feature that is mapped at BSAD. Subsiesic faulting associated with the graben could cause there to be lost circulation while drilling. Reservoir Pressure • Reservoir pressure is estimated to be 3,249 psi at 8,800'ss (7.1 ppg EMW). Maximum surface pressure with gas (0.10 psi/ft) to surface is 2,369' psi. Cody Rymut CTD Engineer February 17,2011 DS 02-21B — Coiled Tubin, 'filling TREE= MC GEN 11FMO� �1 A SAFETY NOTES: WELL ANGLE<70°LID 11480' "" I WELLFEAD= C CONTROL LINE BAD""" ACTUATOR= BAKER C KB.ELEV= 64' BF.ELEV=-- KOP= _2900' Max Angle=__)5_@ 11720' 0 2198' —5-1/2"CAM BA L-0 SSSV NIP,ID=4.562" Datum MD= 11180' w/5-1/2"DSSSV(12116/06),ID=2.786" Datum TV D= 8800'SS GAS LIFT MANDRELS ST MD TVO DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DMY RK 0 08/20/10 13-3/8"CSG,72#,L-80, ID=12.347" — 2537' 2 5232 4767 49 CA DMY RK 0 08/20/10 3 7172 6035 50 CA DMY RK 0 05/02/82 4 8520 6913 47 CA DMY RK 0 05/02/82 Minimum ID=2.37" @ 11360' 5 9286 7460 42 CA DMY RK 0 05/02/92 6 9356 7512 42 CA OW RK 0 05/02/82 3-1/2"X 2-7/8" LNR XO 7 9745 7806 41 CA DMY RK 0 05/02/82 8 9819 7862 41 CA DMY RK 0 05/02/82 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202 8152 41 CA DMY RK 0 05/02/82 ' 10266' –5-1/2"BAKER PBR ASSY �� ►� 10282' –9-5/8"X5-1/2' BAKER SAB PKR ID=4.012" 5.12"TBG-PC,17#,L-80,.0232 bpf,ID=4.892' — 10293' I--"— --I 10293' —15-1/2"X 4-1/2"XO ' 10298' –I 3.70"BKR DEPLOYMENT SLV,ID-3.00" TOP OF 7"LNR H 10317 II ' 10353' –4-12"CAM DB-6 LANDING NIP,ID=3.813" 10364' –4-12"BAKER SHEA ROUT SUB 4-1/T TBG-FC,12.6#,N-80,.0152 bpf,ID=3.958" — 10366' I 10366' H 4-1/2'TUBING TAIL 10374' H ELMD Tr LOGGED 05/05/82 7"MILLOUT WINDOW 11309'-11316' 9-5/8"CSG,47#,L-80, ID=8.681"H 10597' , k PERFORATION SUMMARY I REF LOG: SWS NEM GR/CNL ON 06/10/01 �•.• •Q4, 11300' —3-1/2"HES MAPS CIBP(06/11!10) •:. •"• ANGLE AT TOP PERF: 42'©11236' .4,‘,, ., Note:Refer to Production DB for historical pert data ��• I 11360' H3-12"X 2-7/8"XO,ID=2.370" SIZE SPF INTERVAL Opn/Sgz DATE �Z� __ 2-1/2" 6 11236-10263 0 06/11/10 11141444' 2" 6 11313-11333 C 03/14/1011111111111/11 11111111 11550' –2-7/8"CIIBP(07/13/09) 2" 6 11500-11515 C 07/13/09 1111111 2" 6 11700-11750 C 05/09/02 11111111 1111111 11111111 1111111 ,'. ` 11900' -(CIBP,05/09/02 2" 4 12000-12300 C 06/11/01 1111111111111 1111111111111 i 1111111 11111111111111 +##/110011111 PBTD — 12338' 4.1,`7"LNR,29#,L-80,.0371 bpf,ID=6.184" 11627' 2-7/8"LNR,6.16#,L-80 STL,.0058 bpf,0=2.37" --I 12371' DATE REV BY COMMENTS DATE REV BY CONWENTS PRUDHOE BAY UNIT 05/02182 ORIGINAL COMPLETION 09/01/10 JIVC/PJC TREE C80(08/18/10) WELL: 02-21A 06/11101 CTD SIDETRACK(02-21A) FERMI No:'2010990 07/13/09 JKLYPJC CUP!PERFS(07/13/09) API No: 50-029-20781-01 03/17/10 KJB/SV ADPERF(03/14/10) SEC 36,T11 N,R14E.880.83'FEL 8 929.11'FNL 06/18/10 JMF/SV SET GBFYACPERF(06/11/10) 08/25/10 JKC/AGR GLV CIO(08/20/10) BP Exploration(Alaska) February 17, 2011 DS 02-21B — Coiled Tobin; :filling TREE= .WIC GEN 11O 2�')1 D SAFETY NOTES: WELL ANGLE<70"@ 11460' "' E LHEAD= FMC CONTROL UNE BAD"'" ACTUATOR= BAKER C KB ELEV= 64' Planned CTD Sidetrack BF.H-EV= ? KOP= Noir TxIA communication Malt Angle= 15 11720' O i 2198' —5-12"CAM BAL-O SSSV NIP,ID=4 567' Datum MD= 11180' w/5-12"DSSSV(12/16/06),;0=2.785" Datum TVD= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DMY RK 0 0820/10 13-3/8"CSG,72#,L-80, ID=12 347 H 2537' 2 5232 4767 49 CA DMY RK 0 08/20/10 3 7172 6035 50 CA DMY RK 0 05/02/82 17 4 8520 6913 47 CA DRY RK 0 05/02/82 Minimum ID=2.37" 11360' 5 9286 7460 42 CA DMY RK 0 05/02/82 6 9356 7512 42 CA DMY RK 0 05/02/82 3-1/2"X 2-7/8" LNR XO 7 9745 7806 41 CA DMY RK 0 05/02/82 8 9819 7862 41 CA DMY RK 0 05/02/82 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202 8152 41 CA DMY RK 0 05/02/82 -. — 10266' —5-12"BAKER PBR ASSY '— 10282' _9-5/8"X 5-1/2"BAKER SAB PKR ID=4 012" 5-12"TBG-PC, 17#,L-80,.0232 bpf,ID=4.892" — 10293' I \ / 10293' H5-12"X 4-12"x0 10328' - Liner Top Packer 40 —adjust to ELMD TOP OF T'LNR H 10317' 1 10338' I—3 70"BKR DEPLOYMENT SLV,ID=3.00" I I 11----1 10353' H4-12'CAM DB-6 LANONG NP,0=3.813" 10364' —14-12"BAKER SHEA ROUT SUB 4-12"TBG-PC, 12.6#,N-80,.0152 bpf,ID=3.958" -1 10366' * - -1 10366' —4-12"TUBING TAIL 10374' ELMD TT LOGGED 05/05/82 TSGR - 10,644' 9-5/8"CSG,47#,L-80, ID=8.681'1— 10597' I A ► BCGL- 11,150' _ TOC - 10750' PERFORATION SUMMARY REF LOG: SWS MEM GR/CNL ON 06/10/01 ANGLE AT TOP PERF: 42°@ 11236' Z4 exit / 10862' MII Wndow of f Mechanical W)ipstock J Note Refer to Production DB for historical perf data o SIZE SPF INTERVAL Opn/Sqz DATE 43 Trip for Ribsteer? 2-1/2" 6 11236-10263 0 06/11/10 2" 6 11313-11333 03/14/10 Cut 10,905 , 11800' 3-3/16"X 2-7/8"XO 2" 6 11500-11515 07/13/09 TOC 10910' rg,y 2" 6 11700-11750 05/09/02 CI BP @ 10920' t'> 2" 4 12000-12300 06/11/01 g�� k ` 2-7/8"L-80 Liner,Cemented 8 Perf'd 14175' A v ;ins ;., 7"LNR,29#,L-80,.0371 bpf,ID=6.184"—I 11627' L 11300' H3-12"HES MAPS CDP(06/11/10) DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/02/82 ORIGINAL COMPLETION 09/01/10 JMO/PJC TREE C/0(08/18/10) WELL: 02-21 06/11/01 CTD SIDETRACK(02-21A) 10/29/10 MSE PROPOSED CTD SIDETRACK PERMIT No: 07/13/09 JKD/PJC CIBP/PEKES(07/13/09) AR No: 50-029-20781-0. 03/17/10 KJB/SV ADPSRF(03/14/10) SEC 36,T11 N,R14E 880.83'FEL 8 929.11'FPL 06/18/10 JMF/SV SET CIBP/A DPERF(06/11/10) ' 08/25/10 JKC/AGR GLV C/O(0820/10) BP Exploration(Alaska) February 17, 2011 C) a c' l a z 3 Zo m 0 U N W 00 co C M 1D O O01 po O O = .-O 63 N CO O N 1 O zo ' V) v °- r- v r- , a �O N _ r 4c v I c o 0 o o o C) o a w co ID m O`ei la cuU C N N 7 a al U SI 11 rn 20 ) 0w CT) `- Z > m J C-,-3 V a Ce m al N m v E cm ami>al O > N V) ,_ 7 CO> 0) m J o c N m E 2 c m o c 3 = O y r al 7 M TY F- 2 W 2 D D co :. C O Gl >J as J C9 mm 3 O p 'O _ O r Ol L r- = r 422 2 J J min C C w o F c m V N Eai c V m C 3 3 O '6 C C .. v R al O i O ` N ii o o m w >. m E a= c co"' 0 0 0,1 >.ma 3 v o 0 0l (5 O t S In M st O d:.. tt)'.. J 2NG y o 01io = = = G co co CO M m cd r Ts- co O co 0, CO N M CO �/ ca Q jl to 0 COOm LL a) O O 0 d c) cn _a t (n =In o a) Q o a o 0 0 3 O CL 0 x O M d 3 m co N CO e N O Q)= ce LN (13 R t CCL C CO t O . - Z W CO •C H C.. W Z W d CL O 0 0 Z .. o F- 0 CC >•• a a O CO m ,- W W R N ;; = 0 a'.. o ii O .2 0. t as 0V) a a c _ o V� sr N co Le O a. m mZ N !L C`? miW 0 1, , O = = L O O O o. >, N Z Et = N O O O m F 0) O O O co CO oomO O NQ ( _I m 0 O cE a al= C a o CO m r) m . ? C 0 1 N N z 0 m CD U m d m N N a. n O O '06 m d .a) m N r O m m N 0 m O (n Y 2 2 C 'G a N N C D Z a C + W C Z d d 0 O d m a7 C co il Ma w y c ° c v :: E ui > m m CA m o ES�y� C.. T N O O O O O O a) C Z C R o.m _ a ) d to o N a E. _ a « e Ol v o m 0 Q :: m m o •--. 0 . R o o m al 0 m 0 m 3 d m v z Dau 33o a. 202 W u) a. 3 3 a 3 2 0 Q > > 0) 0 O 0 0) O V CA 0 0 O a a O N N ^� c1 00 0 0 0 0) o m C) 0 0 O M a, Co 3 a 4) o 0 o 60 0 0 4i o 0i o CO ...1 = M CO M N Q) CO N- (A 0D O) (O CO M N m 0 O d U R o CD C d O O) O N = 0) 0 h N N 0) 01 4) (O CO Ns N- 4) 0) • d 4) a 0 CO a a CO O CO 03 0 N Q a (D 0) U) 4i of 0) a) of o of o (0 0 0) a N (0 CO O N CO C!) O N O M CO n • _ V CO CO 0) CO O) 0) O O 0 N CO M M a O 00 M ci M M C') M y at: a s a s v a s 0 O • o o ; N N 7 d O 0 m CO o (nd r 2 Z 0o O O C) C) 0 0 0 O O O O 0 O . J M c Q CD O 0 O O O O O O O O O O O O 0 ", O O O) N N N N N N N N N N N N N N 7 ...4.- 0 r r N Cn ,- 7 ,_ O)p d o N a) = 2 Q O 2vF- mow y 0 03 n CD O CO U) a V' 0) M a N (D C) 'O 4) 0) 0 a 0 4) N- 4) T CA N a N 0c a 0 0 0N- - CO N- 0• 60 IC) C) v o ` L a ) O )O OO n N- O O M M a CDN- CO OO N N Nw d = _ _ _ _ d T O) co QI Q> Q) 0 O Q) W O) CA D1 CO W C = R--- CD (D (D CD CO (0 CO CO CO CO CD CD (0 CD CO d O W CO tl CO • V d = 7 -12 = C ' V N O N03 0) V- M O CO O O N CO CO CD G i d w Nd E co CO 4) 0) O 4) 4) a- a N v- 4) CO CO O) ' d d • O 0 (D O C) O) M CO N C) N 4) 4) O 0) 4) O d K ›re a .. (a m a) co co (D O 4) 0) N 00 a N- (D 00 (D 0)C() 4) 4) 4) 4) a s M M N N 3- a- 0 0 re L d r N 4) 4) 4i 4) 4) 4) 4) 4i 4i 4) 4)U ) 4i 4) 4) u G r z m r= a a a a s a s a a s a s a a 1- 0-I ° 0 00 0 CO ro"' rn 0) 0 CO CD CD CO 10) CS) CD 0) 01 0) 01 0) c o c 2 (n U) 4i CA 4i 4) (n (n (n (n 4) 4) 4) 4i 4i 0 O CO i. 0yO CO a/ CL 'a co a 4) co O CO h O a (O (D CO CO N N 1:8 0 - a M a CO CO M M 47 CO O 0) N M 0 O W M N O 4) a0 0) (Ni h O) Na CD N (O d T a G 0 M nO coO OO O O CD CO 00d) N N N M N N CI) ZIt E^. a a a asa- s aas a s a Ni. s 7 � < H a -0 CL W U Cl) M a 0 O 0) CO C- 0) a M 0) 4) 00 O O a CD O 0) .- N- 4) O 4) M ,. CO 4) 1: a N- r7 CO d U a N 0I (O r a • C7 O O a 4) 0) d a 4) (0 N- M a W co CO a O M CT N F- 4) 4) 4) 6 4) co N. N- N- 00 Cb 0) 0) O ' CO Z O >0 co M M M M M M M C? C? (`? M M M 'T I Q o >- F- 0 M N- a co 00 O O CO O N- 4) N 03 0) N CO N 0 (O CD a 4) r 41 0) 10 CD 0) N 0) N O 6 N- 4) M CD 4) N- N N- 6 N O a O CD N- CO a O M CO N N- 01 N (0 0) 4) 4) 4) IO 4) (D N. N- N CO CO O W 0) 0) U) 05 00 CO 6 CO W CO CO CO CO 6 6 6 6 6 '..1 � � N O_ T CD j (D CO (O M CD O O a CO 00 M a CO CD CO (O A- O 0 0 0) CO 0 N CO V LU L. 1) O O O O N M n N N- W CO N- N- M 00 O I a a a a s in N- N- CO (n 4) N- N- ti CD .0 L.•CO a- a- a- a- a- 1- a- a- a- .- ' V , e- m N N .... 0 O O SLS N0 d C co 42 c z CO 0 d CO N N O CO CO I� 4) N a Q n U a N- N- 0 a, CO (n v a, 0 CO d O O M 01 4i N. 06 m CV v a CD CO N- a0 v 6 U T CO• O O '6 6i a a a N a a a 4) 4) 4) 4) 4) 4) 4) CO n ▪ d 13 N Q o• 0 m O : Co M O = 'O 0 N N = A m Z O ,_ CO N N m 0 Q Zd0 oo0 ao0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 °o ea. c c m O o o 0 0 0 0 0 0 00 o O (0 O (D N O O O N CD N w O N aD O O O O N O O a O O coO O C) C) a 0 4) O O) in kill El O E W = co co a 0o c3 co O N N M a a LU4) VIM :11r o= 0 N D 0 a0 O o c0 0 � � c .. O T a` m 2 I- ,- Y W `- ,ate ,- — ,D - ID `- n � 03 a� El E •d - - a 'w Z C Q Z (a.) a` Co co U)) a a CO 0 CD N 0 0 0 0 U) 0 0 a0 0 0 0 0 0 0 CO 0 0 0 n ^� =0 co co o O o o co 0 0 o o O co 0 0 o O o 3 O 0) CO O O O O O O N O O O O O OO O O i = M N N CO O) (A O) C) C) C) W O) C) O) C) O CO O) O) C) O) m 0 a Io N Li. so. C I— o) O 0) N 0 CC) 0 f` LC) ti u) 03 st o— CA N CD 111 u) N Cn a 4 0 Cl O C) CO N IN CO LO N CO CA O O N CO CD CD Q 6) V O Cs) N. Is- I` IN u) U) 4 4 N O O CO O r Q @ I u v CO L CD CO r N. 00 CO m O O ^ N CO co a u) 0 COD N- 0 CO 0 Osi 7 V u) O (!) ici. u7 Cl) O u) (!) tri. u) to 0 O _ O v > O N O N N j o D > a) to 0C/) CD r- Z Z O 0 0 0 0 0 0 0 N 0 0 N 0 0 0 0 0 0 N 0 0 1 J M = < O O O O O 0 O O O O O O O O O O O O O O O @ ,— 0 1 N N N N N N N O N N O N N N N N N O N N N N d 4 E co r N 7 p)p I w d N- N CDO O CO CI) U) N CO CD M CO 0O CO 00 0 U M O) .— O M o— CD N N O O CO sr CO NCO CD C1) CO O M C N CO M N h IN V O O O N Cb 4 O (D (D N fA m L N CO cr at V' at (C) «) N- r IN CO CO C) M N N N M u) w = N N N N N N N N N N N N N N CO CO M M Cl. M Cn O S' ..' 1." m CO W W CO C7) O) O CA O W C7) CO CO T O O T D) (A W WC A CD CD CD CO CO CD CD CO CD CD CD CD CD CD (D CO CO (D CD CD CD a) O W • d r.• v .c• c� 0 0 C d = V 00 W CO M O CO 1' h CO N OD u) 0 CO O CO d td 0 — co V' N- (O M N IN N O CO O) N. s— I— N O CO O) O o w d 0 U N CO _ CO . CO — M M 4 u) u) CC) CO CA N M 4 4 4 ui O O 0 w et T 10 p) 0 CO tO CO (N N N N N N CO O O co co r N. CD CD Cf) M N O O) ()) CO N- CO V 0 t IP. L �' V Vim' �V V V V 7 0 CO . V sr J 1- 2 N 0 p D) rn rn rn rn CD CI (n rn CD rn rn m rn CO rnCO (n CZ CO rn Z (D (n in. ui in- u) CD ui Cn (D (n (D Ii ui (D (n (D in- ui ui Cn CL Ce rva) at 0) O co u) CO CA O (P CO r O CD CO r (D r Q) C O O CO CD CC) CO O n CD (C) 0) 0) N Mt Is- 0Ln- N.: 4 N CA M r) n 0 0 M CO N n 4 4 CO N M co in toCO O CD CD N- IN IN CD h COCA 0 N 0 N M a N N N N N N N N N N N N N N CO M CO M M M M N 15 v v v v v v v v v v v v v v v v v v v v < F— a o CO11 a N N- M (D 0 1"-- CO 0 r CD N.- O CO O CO CO CO u) O (A C17 r N O u) CD N O O CD CO CO CA u) M u) q m r si 0 4 CT 4 M M N O r Cf) M M M N 0 Q) N N CD N st (N N N N N N N N CO O CT N N CO CO st u) CC) CO r n CO C) co_ O N N CO VI co O v v v v q ' v v v v v v y fn u? (n (a? Cn (n .n a Z-- N 0 ? 7 V V V V V V V st St st st 'V V sch st st N u) CO CO CO CO CO M CO CO CO co co co co co co co co co co . M O N N N N N N N N N N N N N N N N N N N co co co co co co co co co) COco) (A COCO0) CO CO 0) co co co CO CD CO CO (n m m m m COCOCO (A O) COD) (A (A (A O CD CO CO G 0 U)Co 0cO CO CO (>o ao Co 0o ao co- ao co Cb m m CO 0o co 00 O co O I` u) CO u) CC) IN u) LII M CO CD IN r u) CD CO CO CD IN CD N CO CO CO Cb CO CO a0 CO CO Cb CO CO CO CO CO CO Cb O 00 I IN M CO IN CD CD r CO CO r ti CD CD CA Cn IN CO O IN CD CO r r CO r r CO oD CD CD CO LO CD r CO CO IN CD CD m :1_. Q 0) J o— CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 Q c0 N 0 O O O O O O O O O O O O O O O O O O • CO 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0/1 n CO C) rn CO rn CD rn CD CO CO CO CD CO rn rn CO rn CI) rn rn C) T co m N C u Q 0 u) co M 7 N N C 2 2 Z d d 0 0 0 0 O co O co O co O O co O O O co O O co O O O co CO >1O O 00 0 CO O CO O O CO O O 0 CO O O O O O O CO a 4.I df 0 0 7 0 V O O0 0 O 0 0 0 W0 0 CA O 0 0 of C7) 0 0 V' O N O O) O O (A O O O R 0 O W O O O M M 3 CD 1` N- CDCO O m O 1— n— N CO sr st CD (D CD N. co CA O) (j h .. .I . a Q O) r N N N N N + N N N a N N N N r, rrr r r rr r r r r D as 0 o p o: :m m m cov c.) am330 a CO O O O O O O 0 0 V N- _0 0 V 0 N V 0 V .- n ^ C O O O O O O O O CO Cl O N0 CO O (D N O CO U) U O O O O O O O O O O O O 6) O 6) a) O 6) 0) 0) T 6) 0) 0) 0) co 01 C) Q) co co O 0) (A 00 CD 0) CO W m3 0 -o U R CO C u.— Cti U O O O N CO 0) R) O CO r 0) CO .- Cr) L0 O N- N L0 0) O O 0 o d CD V: 6) N. CO CD a- CD M a- N W CD CO CD M CO N O 0 Q CD V CO (D u 6 6 V N C') M Ll') P) CO N U) LL) 6) V V h Q N CO O O CD CO CO CO CO CO CD h L0 O 0 U) O U) (t) N 0 i V CO O O O N N CO V V' V' 6 (1) CO (- CO CO CO O 0 o e Ll) Il) co. CO CO CO (D (O CD 6O CO (O (O CD CO O (O O N 0 0 o -0 > _ o N o N N 7 a O j 0 R 0 N N2 Z O O O O O O 0 0 0 0 0 0 O O O O 0 0 O O ' J M 7 < O O O O O O O O O O O O O O O O O O O O - co a- 0 N N N N N N N N N N N N N N N N N N N N Nd V E CDr r r r N C0 7 .- 0) N co N 3 .0 G Or. M V h M W 'Cl; V CD O CO V CD CD N. L0 V M r 0 0 V L0 ✓ ,a (O O N CO L0 N V V N- CD a- N- h V 0 CO 0) CO V' C o Cb O O (D N6 M N c6 V V M N O C`) V L0 6) 0) t CO CO CO OD 0) O N CO N N N O N M V co C co co M M V V; V V V V V V V V; VV V V V I. a) 0) 0) rnrn0) C) C) C) 0) 0) rn „- rn• z 0) 0) 0) r ) ) co C IS--- O (O CD CD CD CD CO CO (D (D CD (O CO c0 (D CD CD CD CD CD d o W R • C d V 1100 ;a 0V d 5 GC) C a- 2 LC) N CO 0.- 0) M O CO O CO - n n h ICO N O V C L- ` 66_0 R O V O O 0 C) C) N 10 n N W N CO 0 C) N O 2 0) d 0 W O M V CD Co (- L0 07 ID W V O O CO V V O ✓ d = 0 co C CO L0 V V CO CO N N CO O O 0 6) O CO N- CD CD L0 V 1R7 QCer R Z c+) M M M M M M M M M M M N N N N N N N N = V V V V V V V V V V V V V V V V V V V V 0- > Q Z t I o -- a) 0 0) CO 0 ) 0) a) a) 0) a) C) 0) 0) 0) 0) 0) CS) 0) a) 0) Z Ln 6 U) L0 L0 L0 O u7 U) L0 CA tO U) O L0 L0 L0 Ln 6 Ll) L_ 0 N W V m COO M 0.1 CD CD N- U) O M N- LD Cp L0 O 1� LO (D N- N V h N r N N COCD LO COD) Cr) . V. CD OL a) m r CO O LD CO V (D O O r-: CD N Cb O a) V L0 L0 LD CO CO 00 C) ,- CO 0) T 0 1- (O CD CO Q) CA a) y. CO CO CO CO CO CO M M V CO M CO M CO M M co co co co CO Q V V V V V V V V V V V V V V V V V V V V I U) la< I- a. o CL 0 WV O CO V L0 No N LO N- CO M CO N- V V N M N- CO N a t0 CO CD n O (D O M L0 O I,. V O O M Q) 0 N r N L0 m CO n N- r OS L() N CO N U) V O 6 a) O N O L() O oa O O V O O N n O O 0 O O O CO 6) L() O CO N O O CO co (- co co CO co O O N N N CO V VL0 CD CO CO, L6 Ln Ln Ln Ln Ln Ln c0 6 (D (O (D (O (O (O (O CD (9 CO Q ✓ V V V V V V 10 CO N O CO CO N- CO V V L0 L0 CO CO CO CO CO CO N V CO L0 N V CO N- 0) L0 CO (D CD N N N N N N O 1- O V N N co M CD Q) N 6 h CO co co co co co co n O CD CD CO CD CO CO CO N- N- r N- C/) C/) CO O 0) 01 Cr) 0) 0) 0) 0) 0) 0) 6) 0) 0) CO 0) 6) 0) 0) 0) GO O c6 co O O CD OD CD OD OD O O O O ao 06OO CD CO N- h OD M M L) 1.0 L() N O CO V CO O CD N CO M N N O OD CO V CO N N CD CO V CO L0 L0 a) V V V CD O 6 1- U) M O O N O V M M M N O M 6 ,- O co co co h co O co N- CD 00 CO CO 0)) CA Cb h CD CD CO 0) CO Q C 1 0) O O O O 0 O O 6) CO O O 0) OV D L0 CO CO M ( Q O O O O O O O 0) CO CD CO O _ N M M V 10 O O O O O O U) V V V O O CO CO c0 CO CO c6 U) Lb R 0) O O o CO a) a) O) O O) O 6) co co CD co co CO CO co C) T • R ru Em N c_. L L (n m M O r 0 0 N N C 0 Z O m N N Ln Q Z d d O O d O O CO O O M CD O O CO O CO O O O O O O ,-N. CO ■ O O O 00 O O CO Or-- O L0 O O 0) O ( O O L0 O O O N CA 0 O O 0) O O 1- N N u)O O O O V O O V O O 0) 1�� O O co O O O O O L0 O C) O O O O O O r 7 O r N CO CO M V O L0 (D (D h h co W D) O r r R O_ h ` a Q M M M O M M M n M co M M M O M M O M M M M M N V V V Q :a � — � - r .-- � � � � r Nr Na- N � F a rn c o Si LT”�. p0« 0 m 0 m v Z C) a Cl) 3 Q a a 1 o, I 2 ' hix2ip ir z .-• - E9 = io I j Ii3 m 03Ig, h - -___.__-- -_ vk :v - 03 305 $ 72 74 8 y1 j, __ 0 11 INoma ^ = , s ++ F a eras, ^ N 5_ r a_ $ E n4� "-' 3 0 �j ��nn l,$ o m'__ S v n Vi-L4 c N M ..-1: \::^ ii S 1 g ryry N E I IllP — ms , N - N —N - •„,.r.- T co vt os o v n 0 u w 82 o no = 8 v 7 ^ 8 N ^ v E _ ^:' _ , K I S' emu 8R .(WU OS0(+)truoNA-Amos - - i = 74 01 - 9y 3i•oaa ' rs 8 - r •Z ov - _ 15 ,.1....,..0-0----------P a _ _,„..4 E ,i-0-' m �V _ � 1 , 1 _ m _ I I m a Ig e 8" Q8 :$$4$R8888888$8888$ - I anr° Q 62'DR8c8V88,28"8.8.288M5E8 VZ 3$04888888888884$8 $888 I X,34 . ` 24 Z Q _- n8.3g ^ e III n (02 444,M444041W- - "IC- wi ; rrym51, 88xxxxmmm2m"q4 wi " ■■■ o :2 W48S3eM2 tREU-24 zs aas43smo4mG2m s mg o .Q q44? 880888888882Na8mm8 :.4 m P > „ S. o °88888me82m2Sig22i3}Rm 78I .:, mh 11(:°° 0 NaJ(NaJ77,a,cna0gt;VAZI. 0 : o.-MM.. >m^m a.iwc.n (u?B S6)43daQ reotuan aril NM BPPASSPORT HUGHESBAKER Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-21 -Slot 21 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 02 MD Reference: 47:21 4/13/1982 00:00 @ 64.00ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: 02-21 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Fteference Wellbore 02-21B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 3 Offset TVD Reference: Offset Datum Reference Plan 3 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+ 100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,850.00 to 14,175.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,614.10ft Error Surface: Elliptical Conic Survey Tool Program Date 1/14/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 10,850.00 Continuous Gyro Survey(02-21) GYD-CT-CMS Gyrodata cont.casing m/s 10,850.00 14,175.00 Plan 3(02-21 B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 14,175.00 8,977.65 2-7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 01 01-08-01-08A-01-08A 12,850.00 13,400.00 1,262.96 264.73 1,096.95 Pass-Major Risk 01-08-01-08A-01-08A wp13 13,558.76 13,950.00 686.18 216.56 569.97 Pass-Major Risk 01-20-01-20-01-20 13,360.74 11,881.00 885.89 963.11 -42.47 FAIL-Major Risk PB DS 02 02 11 02 11 02 11 12,325.00 12,150.00 527.41 270.39 264.75 Pass-Major Risk 02-11A-02-11A-02-11A 11,975.00 11,700.00 660.14 662.99 20.96 Pass-Major Risk 02-21 -02-21 -02-21 10,875.00 10,875.00 0.13 3.25 -3.05 FAIL-Major Risk 02-21 -02-21A-02-21A 10,875.00 10,875.00 0.13 3.25 -3.05 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/14/1011 11:18:05AM Page 2 of 16 COMPASS 2003.16 Build 73 to 4 y \� m Fv'esa=�q 6lry nn$n m'6 urviN Rm^.^�R�`n,'$. H>- 0,2 a AppAs hi4gws22 8emmCmm,0 •88.88888888888888888888 _N > > 5 'a Z� Im 8 rvmF,spREaQS,8R8ap Fas z m m o 4 9a 8888$$$$$$$$$$$8a8$88 3 a 5' 9' g o S 9 4 N a `> 3' _ >Q R > M _ S _ > ;' mai ai of riry nriry rvriry > CSN > N % % ] ] Q O O ] -7 ,18 N N m e > g N > g N 5 4 ] Q n TT C7 z N p ado ^e N 7 N '1 N a f N N tp b ioS�'181R$W8 ."2.0;4,7,q`,P02 _W O 1° 4? w O O O 7 2 O m m ^ O e e N N O 2 O N O b O O �aiitMi�4i54a 0111511 a '''f.' w .do400 ^$ o< 4 _Nmon mcMTe: co z Zcc ry N N Q O 0 0 0 0 C � N ry N N N N N N D N re 9 �0s J 0 - oe - o0 0000 - 0000 0 G ?^88=n 9 n7�88n�r000do^o1 j . ry m 9� 3 W;Mbi 0p7v m ' .288 ryog4g NNH ^ NgnSeo00 - 74002 Io a ? asv o ov00000000000 E a IN p-, 834.1A ;;XMM;",M«8�� � o off- g�_2 lmllrilm1111sa111xaali ..-,- ! sssv8 88,8m,-.3me88maex - o S u ! I 88 .EPOMS:= 8.8.888.8888812 828L2 0 9 1ii. 3 z 288888amaee^mwF,m °Hamw 'dry t$ t 3 �do-nn-+mmmrm u4-nen+nnrmm. -? -----rve:Ail 0 9 .m 0 o s 8 8 y9 s m O R N G N a0 a P O N I N SIQ E O N 4 o ^N o H^ory C1 R 1 arr'^ oE tICV !ill - ,` ^o N o - c sow y. -----% ` v .r C N s' - s N O O m 2 G 8 0 N. 0 cn :O - 0,Til 0 O 1 N a 8 i ce' N i � U'oio + m O T Hl m N m ' - R O N Q c a. jN 00 a7! E N. a. a_ g. N O Ti«3 '—+ o N 3 a N Li n a - - C N T C W N N101 : S N N N I 4 S� S 1I 1► -1'I Y SII ea Et 1115 os 7 ob S2 q _ - . 11 li op. 0 Y YO ry Y V s o 111 V I., i re +ttV �., n J Li mit- < 9Em it C —A �' ' �� 2. e g ■ 3's ■ t f e e e e r _ r' e ; f e e 2- a °a Y �_� mg8 E 7 . - s y ,j ; IL g hi —a -2g • I C gia a sg] v — 1 Biu s I > is li o — I I : I C[ _..1 I III 11 _° • 1 I �� 11 . 11 g 1 o U n ✓ 2 Z Y � °fin Itt t111 • 1 V I I I > 1 U Q 1 v10 ` 51 le• II I wa � /1 • U sLL U ,'-,. • • al mon V I [``!w 1=1 a I—ry � - � ■ f11 1 toil0 1� E W 11 a a 02 0 II et 1 W 1 I!: O iii, 2 1 II V ION 1 .t- 0 . 1 MK— ri Ce IIII 11 1 S 4 J 1 Yw Q ° VI �s V 1 0 . 1 ce O 11 z If Z 8 : ~ 1 I z 1 s I m �i in C �; MI 7_ ] o m " II; e .7 1 tu 1I c c c um a a 11 , 11 II 1 ' L ;Ai=Ill" Y Alaska Department of Natural Resources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number: 28311 Printable Case File Summary See Township,Range,Section and Acreage? New Search ® Yes O No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28311 t" p Search for Status Plat Updates As of 03/02/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 010N Range: 014E Section: 01 Section Acres:640 Search Plats Meridian: U Township: O10N Range: 014E Section: 02 Section Acres: 640 Meridian: U Township: 010N Range: 014E Section: 11 Section Acres:640 Meridian: U Township: 01 ON Range: 014E Section: 12 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-13210N 14E UM 1,2,11,12 2560.00 U-3- 7 End of Case Summary Last updated on 03/02/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case Summary.cfm?FileType=ADL&FileNumber=28311... 3/2/2011 Alaska Department of Natural °esources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number: 28308 8 Printable Case File Summary See Township,Range,Section and Acreage? New Search ® Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28308 '1aP Search for Status Plat Updates As of 03/02/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/14/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 25 Section Acres:640 Search Plats Meridian: U Township: 01 IN Range: 014E Section: 26 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 35 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 36 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-129 11N 14E UM 25,26,35,36 2560.00 U-3- 7 End of Case Summary Last updated on 03/02/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=283 08... 3/2/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME 7:13e/ Qua/Z" PTD# / Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: 7 C4' f/DE ,LSA/ POOL: 4 4Oe- Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 0Ca 0a 1- - cc c - O.S o m o (1) 12, n v ; cn 9 ; r 3 m ,< co 0 ; r 3.o co w 5 w a) O m N.co N p w 0 ce N 0 0 CO PJ O N 0 N 0 Ni I) o O E 7 ° O 0 0 N 0 A aD - - - w w CO CO CO w Co CO CO w Ni Ni Ni Ni N N Ni N N N (0 CO V (S) (T A w Ni °• n (0 co V C) cn A w N -, O CD CO -I C) 01 A w N -, 0 CO CO C) (n A w N -, 0 -I •� m C) (n (n 0 K a) * O o0 0o v =. D =. D O O O O cn O D g c� -o -a O O z, co * g * c 1- -o z = C) O o CD CD Dl CD 0 7" 0 0 7 Q a 0 a coc O = Dl CD CD -o 'a a C 7 CD CD 0 0 0 = m maD ao m m v 7 a �° Dl 3 x x m 5 < 40 ;5, a 5. -i -i I D) 7a .a = 3 CD m < a _ _ _ m a) I_ nCD 3. "0 .-. Di N CD m m 0 (D C C O * < < o C (D O N " N N co O O O aD CD r. o m N C1 co N = 3 -o y (D w (i v a = o o m ° a v 0) , 0 0 o o 0 ? 0 0 C) c7 m < m -i Dl O 7 N 7 D) 0 (0/i O pQ <-5 CD CD N °° �. �. D) 0 ° _. (D r: 7 7 7- o P- N (D (D CD (D 3 (D 7 m 3 Q a) 7 aT C) f0i . y 4 0 3 7 (° < (D 0 N. co ? a 0- Q 0- 0 7 N. C) a a a 7 6 „1 • r i 0 ^; N p_ 0 0 O� ci O 0. N N 'a c /0n 7r 7 0 .° .° Q 3 * 0 co co `� (D 'a N N O 7 N ° (n °" N �. 7 (° (D ° N (° 0 N co (D 'o (0 . 'd C C 'a N C "O a 0 W '0 C 0 D Qo N O 7 C o co 3 N 9- (D - aD a — aD aD 3 P ° A j' "O C C - Q 0 Cl) a -a as O -i 0 c m -0 a 7 m o 3 D (D 3 a (n 9 ° 2 7 0 o m o 0 3 co o a a -oo0 (D ° < a a S) 3 Q 7 0 0 7- ° N .c. "O "d 0 ° O A o .+ a) 5. < `2_ tU. a (D fl). 7 a '•d Oo rn O (D CO (D * O, 0CD n (D 7:13 O O N n N °- CD ploj N 5 N z °(Q *< ° .. o * N -o0 (° N N 5 0w N 0 -o �• C N a a (U 4) Q 3 3 (D N N Q j j a c N 3 D 'U 7 m o m • v °o v n v m 3 0 o 0 0 °) x to a o °•» °•» ° < 3' aD a a o o- O D C o m N ° Q o' m �' 704 0 °_ (� °c (o o m a o ° c a o o co i 7 s N ° m 7 0 7 -1 ^• 7 7 o m 3 7 7 ° - 3 3 w D O o om m a a < 0) an 0. O 7 7 5" S ,N» CD CO 0 0 W CD 7 O 0 -0-' g'<• (U 6,_°' �' (D O 5' O Q m CO (0-5 v y C O Q cm C 7 CO D. In N n (° 7, w0 n D `.+ m d 71 ° Cow 'O "O O. 0- N -O °. o n < b a O * v • (D .7-. N (° W > J (D C 7 ,7. O o (n (n o CL 3 �. CO < 7 c o Vo NI 7 o co co (n a 0 o N n S?o CD 1fl5 -57 !n C N N m n A (° Jo 7 0 co _' ° o o D 0 fD C 7 c a N-. a. m 7 00 7 C 2 "x00 N O O17 0 cn D O aD' tu N N O 3 o c° cn (n C 5.. D 0al a2 v7 o z 7 a . m 0F m w O 0).< o * 3 m co 7 o _ o co 7 0 t 0 cn 7 ° .< N• a" v -n I N o O O cn 7 co co 7 A n O co 3 coco N 7 — O i n 7 Oc N ._ OT N z z z z Z Z -< -< -< -< -< -< Z -< -< -< -< -< z z z z z z z -< -< -< -< -< -< -< -< -< -< -< -< Z z m > D D D 0 > N O O n m n D N N ° n m D D D D D D D O n ° ° n 2 ° n n n n N D D 0 M K I Kg -0 ; Om 0 -0cncnO co z x v) > X m o c4 x. co o a C v (n Co 7 X O (D n 3 ° CO CO a O O co cT 7 0 CD 3 (n 4 7 7 o ° ° c co a) Z N O II a '< °) co aD O ° ° O co 'n N I W co N -o w a 7 N 4) fn CD 3 7 7 aD n N N 0 7 0 co N IV COUS O7 "0 N °- N -0a 0 7 7 CD a D (o COIt C7D -. "0 'a▪ o ql. �' = N (n 7 O cn 7 C) n) Di (° N. co (D (n S 7 a CO CD CD O m 7- G m -o cn m - (n 3 . cn a w C ` A 0 C C O �. (D (D .� 7 O ON O O O N = (D O 7 CO 2 D IIv V CD aD 11 'D �_ O a N 0 cn 0l � 7 D?p 0 a" . WW 0 N 4, ° • - N D CD 7 U cn m o C- m O D -< a C 0. o ' o m D N co N m o --..1 o a) 3 w D 0 v O "a = cn O a) ON A 0 N. O O O O N N m °" CD V C co co K c O O N G 7 0 CC O < Co < • = CD 0 = (D N O 01 O o CD 0 * n 0 .< 3 3 co co (n3 ° — F (° °) -a a w -° a all O 3 coco Q J 7 c co m O O m co = < a o co0 Q 3 0 N n O D 7 CD C — D O O O m • 0 (D 0 an all 4 1.11 1 R