Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
211-054
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 07-13C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-054 50-029-20338-03-00 14132 Conductor Surface Intermediate Production Liner 8997 78 2730 9979 1560 3102 13835 20" 13-3/8" 9-5/8" 7" 3-1/2 x 3-3/16" x 2-7/8" 9010 28 - 106 27 - 2760 26 - 10005 9796 - 11356 11030 - 14132 28 - 106 27 - 2725 26 - 7840 7675 - 8883 8643 - 8997 none 520 2670 4760 7020 10530 13835 1530 5380 6870 8160 10160 12380 - 14110 4-1/2" 12.6# 13Cr80 23 - 11287 9000 - 8998 Structural 4-1/2" Baker 45 KB 8618 / 2059 10997 8618 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028310 , 0028309 23 - 8835 261 833 22293 18515 4 93 0 0 931 271 324-143 13b. Pools active after work:PRUDHOE OIL No SSSV (TRDP-4A locked out 5/20/02) 10997 / 2060 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:29 am, May 13, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.05.10 07:12:42 - 08'00' Eric Dickerman (4002) RBDMS JSB 051524 DSR-5/13/24WCB 8-27-2024 ACTIVITYDATE SUMMARY 12/2/2023 TFS Unit 4 (Injectvity-Test/Freeze Protect) Pumped 297 BBLS SW 5 bpm @ 390 psi (at 225 bbls away) . Displace with 2 BBLS 60/40 and 40 BBLS Crude to FP TBG, Freeze protected FL with 5 BBLS 60/40 and 144 BBLS Crude, FWHP= 0/640/0 12/6/2023 T/I/O= 0/515/59. LRS 72 Assist HES with Gel Squeeze (PROFILE MODIFICATION). Load well with 230bbl 1%KCL, 80bbl H2zero, 20bbl Equiseal, 10bbl 1%KCL then displace with 161bbl diesel. Top of gel ~12,000'. See log for details. RDMO Final T/I/O= 400/588/65 **Complete** 1/18/2024 LRS CTU 1, 1.5" Blue Coil, Job Objective: Jet out Equiseal gel and extended adperf MIRU. ***Job Continued on 1/19/2024*** 1/19/2024 LRS CTU 1, 1.5" Blue Coil, Job Objective: Jet out Equiseal gel and extended adperf ***Job Continued from 1/18/2024*** Complete rig up. Function test BOPs upon installation. RIH with 1.5" slim down jet cleanout assembly. Man down drill performed with night crew. SITP 12 psi upon rig up. RIH taking pipe displacement returns. Displace MW from coil and start circ 1% KCL w/ SL 1.5 bpm @ 3000 psi. Lost Injector control and data collection. Stop @ 11887'. 2 hrs NPT. Cleanout gel from 11887' to CIBP @ 13860' CTM. 250 to 500' bites w/ 15 bbls spacers between wiper trips. 1:1 returns and never saw any Wt loss while cleaning out gel . During FCO, tagged 3 times @ 13404' then went thru w/ no Wt loss. Also pulled 4 to 6K over in various spots between 13275 and 13315' while POH. Multiple passes w/ same result. Caliper indiates eroded perfs in this area. Circ final bite to surface and noted minor gas in returns from bttms up. MU and RIH w/ 1.69" MHA, GR/CCL, 10' x 1.72" DG OAL 22.99'. RIH taking pipe displacement returns. Tagged at the LTP at 11000 CTM. Multiple attempts to get in - couldn't. POOH to reconfigure tools. Drop dummy gun and replace with 4' of 1.75" straight bar and a 1.75" nozzle. ***Job Continued on 1/20/2024*** 1/20/2024 LRS CTU 1, 1.5" Blue Coil, Job Objective: Jet out Equiseal gel and extended adperf ***Continued from 1/19/2024*** RIH with 1.69" READ Mem GR/CCL & 1.75" drift assembly. Tagged in the liner at 13388 and could not make any further progress. Log out of hole from 13357 to 10950. Painted flag @ 13105.6'. POH and download Memory Log. MU and RIH w/ 1.69" CTC, Baker DBPV, Jar, Disc., Circ sub, X-treme motor, and 1.77 parabolic diamond speed mill (OAL 17.78') Take returns to trip tank. Tie in to corr. EOP flag. Tagged in eroded perfs @ 13348' Stuck and pulled 10k over (max) to pull free. Attempt to mill and time mill through for 1 hour. Stuck the mill on each attempt and only able to pull free by rolling the mill/motor. Unable to pull or jar free. Discuss w/ OE and decide to RD. POH and FP from 2500' w/ 60/40 and diesel. Milling wear on the shank of the mill indicating the major OD of the mill dropped into a void. RDMO. Well status relayed to DSO. ***Job Canceled*** 2/23/2024 Original Sundry 323-618 (issued 11/29/23) cancelled as suggested by AOGCC to address significant scope change. Replaced with approved Sundry 324-143 (issued 3/18/24). Daily Report of Well Operations PBU 07-13C LRS 72 Assist HES with Gel Squeeze (PROFILE MODIFICATION () Tagged in eroded perfs @ 13348' Stuck and pulled 10k over (max) to pull free.gg @ ( ) Attempt to mill and time mill through for 1 hour. Stuck the mill on each attempt andg only able to pull free by rolling the mill/motor. Unable to pull or jar free. Discuss w/ OEyyg j and decide to RD. POH and FP from 2500' w/ 60/40 and diesel. Milling wear on theg shank of the mill indicating the major OD of the mill dropped into a void. RDMO. Load well with 230bbl 1%KCL, 80bbl H2zero, 20bbl Equiseal, 10bbl 1%KCL then ( displace with 161bbl diesel. Top of gel ~12,000'. See log for details. RDMO Final Daily Report of Well Operations PBU 07-13C 4/11/2024 LRS CTU #1, 1.5" CT Blue Coil. Job Objective: Extended Perforate MIRU. Function test BOPs on the well. Make up NS MHA with two 1.75" LRS stingers & 1.75" DJN. Bump test H2S and LEL monitors. RIH and did not get positive WHP until 5000', Continue in hole and take pipe displacement returns. Dry drift to 13000 CTM. POOH. ***Job Continued on 4/12/2024*** ***Standby for fluids 1 hour*** 4/12/2024 LRS CTU #1, 1.5" CT Blue Coil. Job Objective: Extended Perforate Continue POOH with nozzle BHA. Make up and RIH with HES 1.69" GR/CCL and 1.765" tapered centralizer. Log from 12988' to 10900' at 50 FPM. Paint blue tie-in flag at 12349.05'. Circulate in 1% KCL with safelube from the heal of the well at 11650'. Lay in 60/40 freeze protect from 2500'. Perform well control drill for open hole deployment. Deploy 490' of 1.56" Millennium, 6 SPF, 60 degree phase guns (470' loaded). RIH and perforate 12380' - 12555' and 12575' - 12870'. Good indication of shot. POOH pumping 60/40 down the CTB. Go on weather hold due to high winds. Flow check well and hold well control drill with night crew - kick while tripping. Wind subsides and lay down guns on 1.25 bph losses. All guns recovered. Well freeze protected with 38 bbl of 60/40. Well status relayed to DSO. Prep for weekly BOP test. ***Job Continued on 4/13/2024*** 4/13/2024 LRS CTU #1, 1.5" CT Blue Coil. Job Objective: Extended Perforate Perform weekly BOP test 250/4000 - Pass. RDMO. ***Job Complete*** Deploy 490' of 1.56" Millennium, 6 SPF, 60 degree phase guns (470'yy g loaded). RIH and perforate 12380' - 12555' and 12575' - 12870'. Adperf depths are shown correctly on the new WBS, below. -WCB 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 07-13C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-054 50-029-20338-03-00 CO 341J ADL 0028310 , 0028309 14132 Conductor Surface Intermediate Production Liner 8997 78 2730 9979 1560 3102 13835 20" 13-3/8" 9-5/8" 7" 3-1/2 x 3-3/16" x 2-7/8" 9010 28 - 106 27 - 2760 26 - 10005 9796 - 11356 11030 - 14132 2470 28 - 106 27 - 2725 26 - 7840 7675 - 8883 8643 - 8997 none 520 2670 4760 7020 10530 13835 1530 5380 6870 8160 10160 13000 - 14110 4-1/2" 12.6# 13Cr80 23 - 112879009 - 8998 Structural 4-1/2" Baker 45 KB No SSSV (TRDP-4A locked out 5/20/02) 10997 / 2060 8618 / 2059 Date: Bo York Operations Manager Jerry Lau JerryLau@hilcorp.com 907-564-5280 PRUDHOE BAY 4/1/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Samantha Coldiron at 3:02 pm, Mar 06, 2024 324-143 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.02.28 13:23:10 - 09'00' Bo York (1248) MGR15MAR24 A.Dewhurst 08MAR24 10-404 DSR-3/6/24*&:JLC 3/18/2024 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2024.03.18 13:55:42 -05'00'03/18/24 RBDMS JSB 031924 07-13C PTD:211-054 API: 500292033803 REV1 Well Name:07-13C API Number:500292033803 Current Status:Operable Rig:Fullbore and Coil Estimated Start Date:04/01/24 Estimated Duration:3 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 211-054 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:David Wages (713) 380-9836 (M) Current Bottom Hole Pressure:3,250 psi @ 8,800’ TVD 7.3 PPGE | Average of DS07 wells Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,440 psi (Taken on 12/25/21) Min ID 1.78” ID @ LTP Max Angle:96° Deg @ 13354’ MD Tie In Log:SLB MCNL/GR/CCL 07-Aug-2011 Brief Well Summary: 07-13C is a CTD sidetrack lateral drilled in 2011. 460’ of Z1B/Z2A perfs yielded 637 MBO until reaching HGOR in 2015. A plug was set to isolate the lower 130’ of Z2A perfs then the well has cycled since at low rates. This project looks to use a polymerized gel to squeeze the existing 200’ of open perfs then target 207’ of bypassed Z2A. Liner Lap passed a No flow test in 2021 with plug isolating the lateral.REV1: Fullbore gel squeeze is complete. CT jetted out Gel to CIBP @ 13835’ but was unable to get gun drift through eroded perfs around 13,350’. Depths have been adjusted to deploy extended add perfs up hole. Objective: Fullbore to perform Gel squeeze for GSO. After waiting on gel for 3 days, CT to jet through gel down to CIBP. (COMPLETE). REV1: CT to add 470’ Z1B extended perfs using openhole deployment. Procedure: Fullbore:COMPLETE 1. 2+ days prior to gel squeeze, Perform injectivity Test with 1% KCL or Seawater by loading well with 290 bbls of 1% KCL or seawater followed by crude FP. Record injectivity pressure at 5 bpm with 220 bbls away. Max treating pressure is 2750 psi. 2. Perform Gel Squeeze. Max treating pressure is 2750 psi. a.Load with 220 bbls of 1% KCL or Seawater to flush crude FP formations b.Pump 80 bbls of H2Zero followed by 20 bbls of EquiSeal c.displace with diesel to prevent over displacement. Final pump schedule to follow with volume. 07-13C PTD:211-054 API: 500292033803 REV1 Coiled Tubing Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. RIH with nozzle a. Swap wellbore over to 1% KCL or SW.CT had 1:1 returns post gel cleanout. b. jet/wash through polymerized gel and tag CIBP @ 13,835’ MD.COMPLETE 3. Kill well with 1% KCL or Seawater if needed (system should be closed due to squeezed perfs). Max tubing pressure 2500 psi but attempt to limit pressure as to not breakdown squeezed perforations. This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS. a. Wellbore volume to top perf = 175 bbls i. 4-1/2” Tubing – 11000’ X 0.0152 bpf = 167 bbls ii. 2-3/8” Liner – 2000’ X 0.0039 = 8 bbls 4. MU and RIH with logging tools and drift BHA: 1.56” dmy gun & nozzle. 5. Flag pipe as appropriate per WSS for add perf run. 6. POOH and freeze protect tubing as needed. 7. Confirm good log data. 8. At surface, prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. b.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 07-13C PTD:211-054 API: 500292033803 REV1 Perf Schedule (Updated for REV1) *HES 1.56" Millenium guns were used to estimate for this job and calculate gun weights. Blanks were added provide interval to set plug in future. Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 3.62 lbs/ft 12380-12555 175’175’634 12555-12575 blanks 20’72 12575-12870 295’295’1068 Total 470’490’1774 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. c. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill, if necessary, before pulling to surface. 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. Freeze Protect Well 18. RDMO CTU. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log 7. Cross Section and Mini Log 8. Sundry Change Form Make up PCE. - mgr 07-13C PTD:211-054 API: 500292033803 REV1 Current Wellbore Schematic 07-13C PTD:211-054 API: 500292033803 REV1 Proposed Wellbore Schematic 07-13C PTD:211-054 API: 500292033803 REV1 Coiled Tubing BOPs 07-13C PTD:211-054 API: 500292033803 REV1 Standing Orders for Open Hole Well Control during Perf Gun Deployment 07-13C PTD:211-054 API: 500292033803 REV1 Equipment Layout Diagram 07-13C PTD:211-054 API: 500292033803 REV1 Tie In:SLB MCNL/GR/CCL 07-Aug-2011 07-13C PTD:211-054 API: 500292033803 REV1 Cross Section and Mini Log 07-13C PTD:211-054 API: 500292033803 REV1 Changes to Approved Sundry Procedure Date: 2/21/24 Subject: 07-13C Change in Perf Interval PTD 211-054 Sundry #: 232-618 Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approved By (Initials) AOGCC Written Approval Received (Person and Date) 3 2/21/24 Changed Perf Interval JJL Operations Manager Date Jerry Lau 2/21/24 Operations Engineer Date CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:AOGCC Permitting (CED sponsored) To:Brooks, James S (OGC); AOGCC Records (CED sponsored) Cc:Guhl, Meredith D (OGC) Subject:FW: CANCEL REQUEST for Completed Sundry 323-618 Date:Wednesday, February 28, 2024 12:23:25 PM Attachments:Sundry_323-618_112923.pdf From: Carrie Janowski <Carrie.Janowski@hilcorp.com> Sent: Wednesday, February 28, 2024 11:47 AM To: AOGCC Permitting (CED sponsored) <aogcc.permitting@alaska.gov> Cc: Jerry Lau <Jerry.Lau@hilcorp.com> Subject: RE: CANCEL REQUEST for Completed Sundry 323-618 All, Please cancel the attached approved Sundry for PBU 07-13C. Changes to the original program will be submitted in a new 10-403 Sundry Request. Let me know if you have any questions. Thanks, Carrie Carrie Janowski Regulatory Tech, Prudhoe Bay East Team Hilcorp North Slope (907) 564-5179 office (907) 575-7336 cell From: Christianson, Grace K (OGC) <grace.christianson@alaska.gov> Sent: Wednesday, November 29, 2023 3:59 PM To: Abbie Barker <Abbie.Barker@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; Casey Morse <casey.morse@hilcorp.com>; Cody Dinger <cdinger@hilcorp.com>; Darci Horner - (C) <dhorner@hilcorp.com>; Donna Ambruz <dambruz@hilcorp.com>; Jerimiah Galloway <jerimiah.Galloway@hilcorp.com>; Joseph Lastufka <Joseph.Lastufka@hilcorp.com>; Josh Allely - (C) <josh.allely@hilcorp.com>; Juanita Lovett <jlovett@hilcorp.com>; Tom Fouts <tfouts@hilcorp.com> Subject: [EXTERNAL] Completed Sundry 323-618 Hello, Attached is the completed Sundry for PBU 07-13C. Thank you, Grace Christianson Executive Assistant, Alaska Oil & Gas Conservation Commission (907) 793-1230 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 07-13C Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-054 50-029-20338-03-00 ADL 0028310 14132 Conductor Surface Intermediate Production Liner 8997 78 2730 9979 1560 3102 13835 20" 13-3/8" 9-5/8" 7" 3-1/2 x 3-3/16" x 2-7/8" 9010 28 - 106 27 - 2760 26 - 10005 9796 - 11356 11030 - 14132 2470 28 - 106 27 - 2725 26 - 7840 7675 - 8883 8643 - 8997 none 520 2670 4760 7020 10530 13835 1530 5380 6870 8160 10160 13000 - 14110 4-1/2" 12.6# 13Cr80 23 - 112879009 - 8998 Structural 4-1/2" Baker 45 KB No SSSV (TRDP-4A locked out 5/20/02) 10997 /2060 8618 / 2059 Date: Bo York Operations Manager Jerry Lau JerryLau@hilcorp.com 907-564-5280 PRUDHOE BAY 12/1/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:23 pm, Nov 15, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.11.14 15:43:14 - 09'00' Bo York (1248) 323-618 Perforate SFD 11/16/2023 Extended Perforatingg , ADL 0028309 SFD CO 341J SFD DSR-11/15/23MGR29NOV23 2470 10-404 JLC 11/29/2023 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.11.29 15:12:55 -09'00'11/29/23 RBDMS JSB 113023 07-13C PTD:211-054 API: 500292033803 Well Name:07-13C API Number:500292033803 Current Status:Operable Rig:Fullbore and Coil Estimated Start Date:12/01/23 Estimated Duration:3 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 211-054 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:David Wages (713) 380-9836 (M) Current Bottom Hole Pressure:3,250 psi @ 8,800’ TVD 7.3 PPGE | Average of DS07 wells Max. Expected BHP:3,350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2,470 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2,440 psi (Taken on 12/25/21) Min ID 1.78” ID @ LTP Max Angle:96° Deg @ 13354’ MD Tie In Log:SLB MCNL/GR/CCL 07-Aug-2011 Brief Well Summary: 07-13C is a CTD sidetrack lateral drilled in 2011. 460’ of Z1B/Z2A perfs yielded 637 MBO until reaching HGOR in 2015. A plug was set to isolate the lower 130’ of Z2A perfs then the well has cycled since at low rates. This project looks to use a polymerized gel to squeeze the existing 200’ of open perfs then target 207’ of bypassed Z2A. Liner Lap passed a No flow test in 2021 with plug isolating the lateral. Objective: Fullbore to perform Gel squeeze for GSO. After waiting on gel for 7 days, CT to jet through gel then add 207’ of Z2A perfs using openhole deployment system. Procedure: Fullbore: 1. Perform injectivity Test with 1% KCL or Seawaterby loading well with 290 bbls of 1% KCL or seawater. Record injectivity pressure at 5 bpm with 220 bbls away. Max treating pressure is 2750 psi. 2. Perform Gel Squeeze. Plan is to squeeze 80 bbls of H2Zero followed by 20 bbls of EquiSeal into open perfs, then displace with diesel to prevent over displacement. Final pump schedule may be adjusted based off injectivity and operational limitations. Coiled Tubing Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 07-13C PTD:211-054 API: 500292033803 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. RIH with nozzle a. Swap wellbore over to 1% KCL or SW b. jet/wash through polymerized gel and tag CIBP @ 13,835’ MD. 3. Kill well with 1% KCL or Seawater if needed (system should be closed due to squeezed perfs). Max tubing pressure 2500 psi but attempt to limit pressure as to not breakdown squeezed perforations. This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS. a. Wellbore volume to top perf = 175 bbls i. 4-1/2” Tubing – 11000’ X 0.0152 bpf = 167 bbls ii. 2-3/8” Liner – 2000’ X 0.0039 = 8 bbls 4. MU and RIH with logging tools and drift BHA: 1.56” dmy gun & nozzle. 5. Flag pipe as appropriate per WSS for add perf run. 6. POOH and freeze protect tubing as needed. 7. Confirm good log data. 8. At surface, prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. b.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *HES 1.56" Millenium guns were used to estimate for this job and calculate gun weights. Perf Interval (RUN 1) Perf Length Gun Length Weight of Gun (lbs) 3.62 lbs/ft 13600 - 13807 207’207’750 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. c. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill, if necessary, before pulling to surface. 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. Make up PCE. -mgr 07-13C PTD:211-054 API: 500292033803 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. Freeze Protect Well 18. RDMO CTU. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log 7. Cross Section and Mini Log 8. Sundry Change Form 07-13C PTD:211-054 API: 500292033803 Current Wellbore Schematic 07-13C PTD:211-054 API: 500292033803 Proposed Wellbore Schematic Add Perf Interval 13600-13807 1.56” guns @ 6 spf Top two intervals will be squeezed 07-13C PTD:211-054 API: 500292033803 Coiled Tubing BOPs 07-13C PTD:211-054 API: 500292033803 Standing Orders for Open Hole Well Control during Perf Gun Deployment 07-13C PTD:211-054 API: 500292033803 Equipment Layout Diagram 07-13C PTD:211-054 API: 500292033803 Tie In:SLB MCNL/GR/CCL 07-Aug-2011 07-13C PTD:211-054 API: 500292033803 Cross Section and Mini Log 07-13C PTD:211-054 API: 500292033803 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Operations Manager Date Operations Engineer Date STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMIS • REPORT OF SUNDRY WELL OPERATIOQ 1. Operations Performed Abandon ❑ Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate ❑ Alter Casing 0 Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:5Cf ei5jp 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 211-054 3. Address: P.O.Box 196612 Anchorage, Development a Exploratory El AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20338-03-00 7. Property Designation(Lease Number): ADL 0028310 8. Well Name and Number: PBU 07-13C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: *r Total Depth: measured 14132 feet Plugs measured 13835 4 , true vertical 8997 feet Junk measured feet S C yy Effective Depth: measured 13835 feet Packer measured See Attachment feet C P'` 1 5" 201 u true vertical 9010 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"94#H-40 28-106 28-106 1530 520 Surface 2730 13-3/8"72#L-80 27-2756 27-2725 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 13000-13070 feet 13220-13350 feet 13980-14110 feet True vertical depth: 9009-9012 feet feet 9014-9011 feet 9005-8998 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 4-1/2"Camco TRDP-4A SSSV 2060 2060 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCONBE° FEU . - l0 ci, Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 257 19161 49 420 750 Subsequent to operation: 454 7365 84 400 739 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory ❑ Development (13 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Sebc,41 ��IV Phone +1 907 564 4424 Date 9/14/16 TL l/76/6I. Form 10-404 Revised 5/2015 I RBDMS f f 1 6 2016 Submit Original Only ,G� /.,.06I/� Y-'' 0 0 Packers and SSV's Attachment PBU 07-13C SW Name _ Type MD TVD Depscription 07-13C SSSV 2059.62 2059.56 4-1/2" Camco TRDP-4A SSSV 07-13C _ PACKER 2311.7 2308.74 7-5/8" CPH Liner Top Packer 07-13C PACKER 2509.6 2498.02 7-5/8" Hy-Flow 3D Packer 07-13C PACKER 10982.61 8606.52 3-1/2" Baker 45 KB Packer 07-13C TBG PACKER 11032.72 8644.92 4-1/2" Baker SABL-3 Packer 07-13C TBG PACKER 11266.22 8821.26 4-1/2" Baker SABL-3 Packer II . m cn Q 0 0 0 0 0 0 0 m m co pp m N N 00 O O N N 00 ,000 O O N- O O M O LOW C N U) d- N- N- N N- U ; 0 0 0 0 O O o o co o 00 L M M Lo N- O) CO CO N MM 7 W 0 N- M M N- = co 'c m V M M O M M M M LOOOMMONMNMOLOW O N N V O M O O O O M O N M O LOto O U) COO) O c0 M M N N N- N 00 O M O M M c0 co O F- O O V M N- N M U) M U) c0 N- W N ON- O O M O) M d N N N M M O W O O COO W N O N N N- M 00 c0 c0 c0 M M O 6) O N M M O O N O N to N M M 0 L[) M W O O M M O O = O M O N NN = N . . . . . . r j , , , I I I I I I I I .Wk.) Q+ M oMrnoLnc0 M r c0 r �o N m O N M M M M M O C O O O O N N N N N O S O x- Coo da D = W O 1— ^ O O O O O O O O O m 0 0 M 0 C�0 O 00 00 (JO c 0? c0 U M V J O ' J O c J J J J J J M J r C N = N O *k J M UD I N QD *k N 4, O *k = x- “ V M O N Cfl •� (A 00 V N N cd •N U O M 00 In !Ni a0 N N - N C N N (Y) O mo r O MO VN MOOMMCODO L11 ,- M C N- N- N (0 O = O N W N N ti N MM M M N N J v- W W Lt HI- Q Q c- w• Oo 0 = U U W W O O L [t0 Z Z z [twwwwwuWwwwmm g DF- F- zzzzzZZZDD O WZZ J J J J J J J J F- F- i ,. 0 • _ / / / / / t / \ _/ � � 0 < \ k o I \ / / \ \ 9- \ , o / I \ \ \ e a a) . _ _ ƒ f £ \ ) V) /� \ 0 _ E o » b » / / I ± E co < 0 ° £ \ OO Ea CL 0 /\ = E /� ) pU / / / / E / \ 2 g � \ / / \ / Li 0 % \ \ a) % p 2 M \0 \ RS \I t Ca kf / a o / W / c0- oy • m oo \J / � ƒ / / e ± / ° 7 e f / F/ � � \ k c = - r / f2 G � _ cm CD CD_ � t \ F� f = \ .7 b_ 0 % \ � \ 2 / ± Dd _$ e * ° ° ° ) EE2 � % / = E E c y = ± ± E _ « \ k £ • o / / O 0 2f 0 j o)(i) f / » 0 f \ / \ LOGO 2@ � G ay 2 12-I t - £ i r 2 < co (0 \_ \ (0 \ 0 \ \ < 120 \N LFEADX 7"L FMC GRAY • 07-1 3C TBG&�lfRT PROD MANDRELS&NIP @ 1282'CHROME AC11. TOR= BAKER C MILLED TO 3.80"I05/20/021- ' 05120102)"'e KB.ELEV= 64' BF.ELEV= 27.5' > ------ 2059' -4-1/2"CA TRDP-4A SSSV NIP,D=3.812" KOP= 2190' 20"COND, H 108°__1 M LOCKED OUT(05/20/02) Max Angle= 96°©13354" 94#,H-40, Datum MD= 11309' ►= 2S 2313' H7-5/8"CPN LM TOP PKR,I)=6.875" Datum TVD= 8800'SS D 19.124" 1 =--� { 2349' -19-5/8"UR FOC 9-518"CSG,47#, SO0-95 XO TO L-80 BTC -I 2327' 'IN2473' -19-5/8"LOWER.FOC 7-518"SCAB LNR 29.7#,L-80 STL,D=6.875" H 2516' , 2510' -17-5/8"11Y-FLOW ED HGR/FRCR,D=6.75" 13-3/8"CSG,72#, L-80 BTC,I)=12.347" - 276(T GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 9-5/8"X7.BKR TY PE"M PKR HMD HGR H 9796' 1 4487 4088 46 KBMG DOME BK-5 16 05/12/14 — &TE-BACK SLV,ID=6.188" 2 7665 6146 51 KBMG DOME BK-5 16 05/12/14 3 9719 7613 36 KBMG DMY BK-5 0 07/12/02 11-5/8"CSG,47#,L-80 BTC,ID=8.681" - -10005--\'4 • 9-5/8"MLLOUT WINDOW(07-13A) 10005'-10055' Minimum ID = 1.78" @ 11030' STEEL BUSHING IN DEPLOY SLV >( 10983' -14-1/2"OTISXNP,D=3.813" 7"LNR 29#,L-80 NSCC XO TO 13CR NSCC - 10970' , r' 10997' -4-1/2"BKR 45 KB PKR,ID=2.370"(DEPTH BASED 4-1/2"TBG, 12.6#,L-80 NSCT H 10994' x ON MECHANICAL TAG 5/12/14) XO TO 13CR-80 NSCT 11003' H5-3/4"BKR PBR/SEAL ASSY,ID=3.875"BB#ND LNR 11029' H 3.70"DEPLOY SLV w I LOC SEAL ASSY,D=2.360" Z r 1 ` 11030' -�3"BKR DEPLOY SLV,D=1.780" 11034' 7"X 4-112"BKR S-3 PKR,D=3.83 IPI 11085' H3-112"BKR DEPLOY SLV,D=3.00" L 11094' H3-1/2"HES XN NP,D=2.75" NL - ` 11096' -13112"X33116"XO,D=2.786" BEHIND CT LNR 4-1/2"TBG, 12.6#,13CR-80 NSCT H 11287' ' PRODUCTION MANDRELS S ST MD ND DEV TY FE VLV LATCH PORT DATE 0152 bpf,ID=3.958" 4 11173 8751 41 KBG-2-LS 'EMPTY BK-5 - 06/16/02 ---17"MARKER JONT - � 11318' 5 11199 8775 41 KBG-2-LS 'EMPTY BK-5 - 04/28/95 33116"WI TOCK(07/21/11) -{ 11348' \,>\ `MANDRELS MILLED TO 3.80"(06/25/02)/BRIM)3-3/16"LNR 3-3/16"LNR 6.2#,L-80 TC11,.00/6 bpt,D=2.80" H -11351 \ >' 11265' 1-BKR KBH-22 ANCHOR IND w/7"X 4-1/2"BKR S-3 FKR,D=3.83" CT INC 7"LNR 29#,13CR NSCC,0371 bpf,D=6.059" - -11356 11282' -14-112"CANDO DB NP,NULLED TO 3.80"(06/25/02) 11287' -14-1/2"WLE3,D=3.958" PERFORATION SUMMARY REF LOG. SWS M M CNU GR/CCL ON 08/06/11 ANGLE AT TOP PERF 88'@ 13000' 3-3/16"MLL.OUT WINDOW(07-13C) 11351'-11356' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 1.56" 6 13000-13070 0 08/08/11 1.56" 6 13220-13350 0 08/08/11 d I 13835' -WFD CBP(08/15/16) 1.56" 6 13980-14110 C 08/08/11 PBTD -1 14123' 2-3/8"LNR,4.6#,L-80 STL,.0039 bpf,D=1.995" H 14132'--ilk DATE REV BY COMMENTS DATE REV BY COMvENTS PRUDHOE BAY UNIT 05/16/79 RWN 34 ORIGINAL COMPLETION 05/06/14 DIV PJC 'TREE= WELL: 07-13C 09/27/94 N2ES SIDETRACK(07-13A) 05/12/14 SWCIPJC GLV C/O PERMIT No." 110540 07/09/02 NORDIC 1 CTD SIDETRACK(07-13B) 05/14/14 LEC!PJC KB LTP DEPTH CORRECTION AR No: 50-029-20338-03 08/10/11 NORDIC 2 CTD SIDETRACK(07-13C) 08/22/16 SW/JM) SET CRP(08/15/16) SEC 33,T11N,R14E,299'FEL&630'FM.. 10/18/11 CD/PJC LNR BUSI-LIG CORRECTION 05/06/14 LEE/PJC GLV 00(05/01/14) 1 BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. (DJ L - ©Sii- Well History File Identifier Organizing (done) ❑ Two-sided III dill III liii ❑ Rescan Needed III [liii 1 I III RE CAN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ D. ettes, No. ❑ Maps: /Greyscale Items: Other, No/Type: GP MO + j VKier Items Scannable by a Large Scanner 1„.025 ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: C Maria Date: (o/3o/IL /s/ niP Project Proofing II 1111111111111M BY: Maria Date: (9/30/19. /s/ k'Yif Scanning Preparation (9-N.x 30 = to O + cl = TOTAL PAGES 6q (Count does not include cover sheet) BY: �1 Date: 3o l /s/ Production Scanning 1111111111111111111 Stage 1 Page Count from Scanned File: D (Count does include cov sheet) Page Count Matches Number in Scanning Preparation: YES NO (c,/3O/Iq-. BY: 40 Date: /s/ (i/iF Stage I If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. 11111111111111111 ReScanned 1IIIIIIIIIII IIIII BY: Maria Date: /s/ Comments about this file: Quality Checked II 1111111111111 O 9 a) m a a) o E a 7 J J .. 9 l a O co>, a) �O a w a) > w a) C) o m 'c\i `°W > E a) 'c cc > E c 0 > E = U N D. Z It eL ' ' a)NZ of 'u) am a 0 C 2 aE a _ CL a ma a 2 0 mo) Uka 0, ' W � , C � Ern CC a ct c 13)Co CSco c > Oo C >` o _ O 9 rCO 05 U- Ua � OaaaY2•2E t a) 2. ° LL w? � , yCLai ~ s aac = � : . cn mE g 0 = E • m CO o 2_ F) f0Om om , jnZ o V 'c) m Daiai > o � o as mO om Om c E CL sm 65 cL LC LL Y. c N a CCX I-a-0 2J 2 it 00 2 a 0 2a Hac9 al- o a, .- r _ _ 0 0 0 0 0 J U d y N N N N N N N N N N N N N 22 O ce r- n N. 1- `- ate- co ili in co co co co Z r J Q) O) O) r .c..1 C-:-) "c-,1 r r r r r E_ co 2 c c c c C C c C c c c c c `L 7 ° a) a) a) a) a) a) a) a) a) a) a) a) a) N m C = = a a a a 0. a a 0. a aa aa g v, ! Y ° U 0 0 0 0 00 0 00 0 0 0 0 a =° O Z 7 0.as M CO 00 M M_ M_ N_ M O O O a) coO o U 'O to N ,- a a a V R V' M '7 CL PZ W g .2 �.,, •- O) co co co O co co co Co 0 CO C 'N M CO COM M N ,- A o M N W W J U m o 1 Z ,- ' = o Q 12 an i CC 0. w J iCC ^ ° v) O 1 O C) O O O O O O O N 0 Z -Jg 0 0 0 0 0 0 0 U • r o a) u) a) O N a a) 1, Lo Lo in Lo E J f0 LO N N tLI) N N s[) U) J �' I CO Q J o g 2CV CO CO C co • a� '=^ vi vI D 5 0 C CC 0Ce H a 0 Q a ZI 0 76 w w 1111 7 7 ,y ,N 7yN Z 7 y a) 0 0 0 0 o• E E o o E o E o • n c E v v v v v i) a) 7 A a) a) N 7 7 E E 7 7 E 7 E 7 o) Z c � as m c a) c as a y D C7 C� C7 C7 C cn Z O ` y N M Co O J .13' ' N .0 _O O i t1 E oo Q L d 03 7 N N N 0 O Y W O Z re Q c 0 E _ F. u. Z �' V O .� N N V) ▪ co 0 O o C O_l-o Q J J W LL l cc Z W U \ \ '�\ \\ .. ' E = Q w J \C') WJJJ t LU Ja. 1WO IT J 0 aaJ J J J W W CD I I t 9 II , CO a Cl Z cw0 -J (74 N 4)w0 0 o )O EJce ce 0 o 5 o o0 w0r !I p 0--I ii W Li N i C Z J Z Et I Z ' o N Z 0Z0 E 2 z 1- ;I-o- H O I Z ..--- c • :° m m F. J u) I,I U U o ! G Q a L,o co r O V 0.16 ',&,...„/ `,, Z a. P Em W N N v) Z Ce 0 O O P • j W W 173 a) !I 0 a J '- °' m Q m aa) Zd a o $ m Z` I- Q N ? W oo i J a m _ 0 ( I T co a � y o 2 o N O r. -a ur, E N ✓ � 0I jI JiI Q l'''' o a r ~ _ N 0 1° W Q o m .- CB c O a) C (/) O p m Q a a Q c a 13 d U z I, 1 To C • r o 0 Z Z m Z O p co E�. oV' co 42 P ay ) T O N H m } a) r N °i d • E m Z v 11 aa) ▪ N N lE6 _O rx O M . j -u3.60 Z Q , V Nr Z a) C' +� c 2O o N a) a) m !- H U N > E a E V — N m o ' E E p ! rn m o E 2 ',� Ili , 3 °a R. 0 <Ce ' O 1I ci 0 M W m D D N Ooh � m -l :Nm 09 m0 x D z = f/ N Q7 W 0 m w m w d ler m ? 0 m m 0 3 0 >. D 000 N O v �o c m o d o 0 `l * Np0Om3 _ � 2T0 = -LTc.. 4x ) m D m m f co W > 0 * .'�' * � w3ec � � lawlN ^' 0 ,N' N0, ' 'o ° m Q0 in '9 Z n n Z(n(n D 2, 0 > -4 MOn °1 > > /- 00 - m �_ o is n 0 r � I71 * co = wtntoii 6 m$ co 0 o JJ m A n WWDW W WDW W W WW WWWmWWWWW M W -n {TAS W4 m (n 1 Z C Z OD ° W 0 ° C -1 z F b b b b b b b b 61'010W0 co -1 `- co W . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . — V . . g02 - 002000g A kw ww OwVm — nn _ 5 0, 0 . _ 00N34 . vw OONOe0O z f) -. mmm (n (ommmmmmmmmmmmmmmm a roto (ng1 (n (n3 (n (n (oEwEo (omoEE (n z M M y M X O X M M O A O X A A X O O X O « < 0 0 « X « < X < W « « < M 0 000 .4E00 -< 000 -( 0 -< 0000 -‹ 0 1m a. 51/ 7 � 7"307"3730730P3WW007J c `< (ntn (I) cOWE (ntn (n3N30 (n (n (n330 23 m > > > > > > > > J > m D D D D m m D z do -1 -1 -1 W 11m -i1 -( m -Im111 -Imm -1 CCC OCC CCc c cccc c 0 . _1 _I � 1 � 1 _i111 -I1 _1 =i _i _( ._i1 _I r Z c 000 O O m 0 0 0 m O m 0 0 0 0 m m 0 0 m zzz zzOzzzOzcJzzzzQDz a C) 111 11z11 -( z1z1111zz1 0 000 O O m 0 0 0 m o m o o o o m m o 0 m 000 O O C O O O C O C O O O O C C O 0 t -< rrr rrlrrrlr -Imrrrl -ar m r r r r r o r r r o r o r r r r o o r m nn D 0 . 0 O 0 0 0 0 0 O O o 0000 o O 0 0 ( ' 0 000 0 0 000 00000 Z Z 0 = ( - 0 G0) 0 0 GO) 0 9 e C 77 N9 -. Nis.) T „„ comr , 0rwwOA V 0 OT O V owLLDDLcyDpLDyaLLZL O cccccC , 0coCt0cococ O v ' J ' ( � - ej JJ jJ jJjJJJ — J O CO I- C) u' 0 0 s ,�M c C) 3 w o - to o m m 3 > a-,2 3 wDD (n (O m e O 'G 0 0 N o, (n m N m 0 0 OD Fl ea ic N C 7 7 = co oo �p (Q X D N co 0° am tOCDD NN 0 Z CDNd C) (� Oc a C 7 CD ' g N N . . - - 0 N o 0 3 , 3 D Z 2 0 N `, Nr— (A) 0 2.1,1,• o541 21031 HUGHES wwwbakerhug hes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME 07-13C STATE ALASKA FIELD PRUDHOE BAY UNIT UAI E 1/11/2012 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#3954939 Log CD Log CD Copies Copies Client/ Partners Copies Copies Client/ Partners 2 1 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page 1of1 RECEIVE/ 2.101)g JAN 13 2012 v'u BAKER Alaska Oil&Gas Cons.Commission HUGHES Anchor www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME 07-13CPB1 STATE ALASKA I-ILLU PRUDHOE BAY UNI I OA L 1/11/2012 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#3954939 Log CD Log CD Copies Copies Client/ Partners Copies Copies Client / Partners 2 Company BP EXPLORATION (ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page I of I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSivN WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 8/10/2011 211-054 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 7/22/2011 50-029-20338-03-00 4a. Location of Well(Govemmental Section): 7.Date T.D.Reached: 14. Well Name and Number. Surface: 8/1/2011 PBU 07-13C 628'FNL,290'FEL, SEC.33,7'11 N, R14E, UM 8. KB(ft above MSL): 52.26' 15.Field/Pool(s): Top of Productive Horizon: 3858'FSL,4143'FEL, SEC.28,T11 N, R14E, UM GL(ft above MSL): Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 2003'FSL,472'FEL, SEC.29,T11N,R14E, UM 14123' 8998' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 675897 y- 5950290 Zone- ASP4 14132' 8997' ADL 028309&028310 TPI: x- 671931 y- 5954685 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 670370 Y- 5952795 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 MC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD DIR, GR, RES, GR/CCL/MCNL 11351' 8880' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM TOP t BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 108' Surface 108' 30" g43 sx Arcticset 13-3/8" 72# L-80 Surface 2760' Surface 2728' 17-1/2" 5600 sx Arcticset 9-5/8" 47# L-80 Surface 10005' Surface 7840' 12-1/4" 1400 sx Class'G' 7-5/8" 29.7# L-80 2312' 2516' 2309' , 2504' 13-3/8" (Scab Liner) 7" 29# L-80 9796' 11351' 7675' 8880' 8-1/2" 500 sx Class'G' 2-3/8" 4.6# L-80 10983' 14132' 8607' 8997' 3" 63 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MO/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 1.56"Gun Diameter,6 spf 4-1/2", 12.6#, L-80/13Cr80 11287' 11034'/8646' MD ND MD ND 11267'/8822' 13000'-13070' 9009'-9012' Y6. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 13220'-13350' 9014'-9011' 13980'-14110' 9005'-8998' LC"A� '' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ' a 2500' Freeze Protect w/38 Bbls of Diesel ; iz , ;, L-- L'A ' 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production Yet N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 9/7/2011 6 Test Period 4 411 4,555 208 88 11,098 Flow Tubing Casing Press: Calculated OIL-BBL: •GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. -0- 1,950 24-Hour Rate♦ 1,642 18,221 831 34.6° 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 MC 250.071. RECEIVED' None SEP 0 9 2011 RBDMS SEP 12 2011 c Ier-,2, Form 10-407 Revised 12/2009 CONTINUED ON REVERSE AlaEke DO$Gas Cans Co Submit Original Only et.3 0.11 anchor / & Si 29. GEOLOGIC MARKERS(List all formations and mark. icountered): 30. RATION TESTS II' NAME MD - TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. 21TS/Zone 2A 11378' 8894' None Zone 1B 11593' 8971' TDF/Zone 1A 11868' 8883' TDF/Zone 1A(Inverted) 12373' 9000' 21 TS/Zone 2A (Fault,Enter f/Base) 12913' 9007' Formation at Total Depth(Name): 21TS/Zone 2A 12913' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I herebybestkLigg, of my knowledge. certify that the foregoin is t•rue and correct to the ofyq3/ Signed: Terrie Hubble Title: Drilling Engineer Date: PBU 07-13C 211-054 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Jacob Leemhuis,564-4989 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America -ALASKA- BP Page 1 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay ' Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) _ Date From-To Hrs Task Code . NPT NPT Depth Phase Description of Operations (hr) (ft) 7/18/2011 16:00 - 18:30 2.50 MOB P PRE PREPARE RIG FOR MOVEMENT. PJSM ON RIG MOVE,EMPHASIS ON COMMUNICATION. MOVE OFF 5-35,CLEAN SITE OVER WELL • WHEN RIG MOVED OFF. 18:30 - 19:00 0.50 MOB P PRE PJSM ON RIG MOVE WITH NEW CREW, ASSIGN DUTIES,CONFIRM COMMUNICATION STRATEGIES. 19:00 - 00:00 5.00 MOB P PRE MOVE RIG FROM DS 5 TO DS 7 7/19/2011 00:00 - 00:30 0.50 MOB P PRE MOVE RIG FROM DS 5 TO DS 7. POSITION RIG AT ENTRANCE TO PAD. 00:30 - 02:45 2.25 MOB P PRE WAIT ON RIG MATS TO BE BROUGHT OVER AND PLACED. PJSM ON COMPLETING MOVE. 02:45 - 03:15 0.50 I MOB P PRE MOVE RIG FROM PAD ENTRANCE TO FRONT OF WELL 7-13. 03:15 - 06:00 2.75 MOB P j PRE VERIFY VALVE CLOSURE, IA AND OA PRESSURES AT 0 PSI, BPV INSTALLED. POSITION RIG MATS AROUND TREE. PREP { CELLAR AREA WITH HERCULITE. POSITION RIG TO MOVE OVER WELL. MOVE OVER WELL. RIG ACCEPT 0600 HRS. STATE NOTIFIED OF UPCOMING BOP TEST AT 0600 HRS. 06:00 - 10:30 4.50--- . MOB • P PRE CONTINUE TO SPOT RIG EQUIPMENT- CUTTINGS BOX,SPOC SHACK. WELLS SUPPORT RU TIGER TANK& 1 HARDLINE. TEST HARDLINE TO 4000-PSI.RIG CAMP ARRIVES ON DS 7. 10:30 - 11:00 0.50 MOB i •P PRE HOLD RIG EVAC DRILL AND AAR. ALL CREW MEMBERS RESPONDED CORRECTLY AND IN 1-MIN 23-SEC. NEW I i SIREN ON REEL HOUSE HELPS EVERYONE HEAR THE ALARM CLEARLY. REITERATED THE IMPORTANCE OF MAINTAINING A SIGN IN SHEET AT EACH MUSTER AREA. FUNCTION TEST ESD-FUNCTIONED PROPERLY. 11:00 - 12:00 1.00 MOB P PRE ,PU REEL OF 2"COIL OFF OF REEL TRAILER !AND INSTALL IN REEL HOUSE. 12:00 - 14:00 2.00 MOB P PRE 'ND TREE CAP. BRING ON ONE 290-BBL LOAD OF 8.5-PPG 2% KCL TO PITS. 14:00 - 15:30 1.50 BOPSUR P PRE NU BOP STACK&LUBRICATOR RISER. USE HYDRATIGHT TORQUE WRENCH WHERE ,ABLE WITH API VALVE SHOP FOREMAN GIVING OPERATIONAL INSTRUCTION TO RIG CREW. SLB MU ALL INNER REEL IRON. I AOGCC REP MATT HERRERA WAIVED STATE'S RIGHT TO WITNESS THE INITIAL BOPE TEST AT 1430-HRS ON 7/19/11. 15:30 - 22:00 6.50 MOB P PRE MU PACKOFF TO RISER. MU INJECTOR TO PACKOFF. MU GOOSENECK TO INJECTOR HEAD. INSTALL GRAPPLE INTO COIL. 22:00 - 23:00 1.00 MOB P PRE PULL COIL ACROSS TO INJECTOR HEAD. 23:00 - 00:00 1.00 MOB P PRE CUT OFF GRAPPLE. REBOOT E-LINE. INSTALL GUARD OVER CONTROL LINE PORT Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 2 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C IX3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site:PB DS 07 I Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ! (ft) 7/20/2011 00:00 - 01:00 1.00 I MOB P PRE DSM GREASE CREW LEAD ON LOCATION GIVING HYDRATIGHT OPERATION ' INSTRUCTION TO RIG CREW. SLB FINISH BOOTING E-LINE. 01:00 - 01:30 0.50 1 MOB P PRE CLEAN AND DRESS SHAKERS. 01:30 - 03:15 I 1.75 MOB P PRE MU BALL DROP VALVES IN REEL. STAB INJECTOR ON WELL AND FILL COIL AT 1 I 1.42-BPM. ' ESTABLISH 1 FOR 1 RETURNS. 03:15 - 04:00 0.75 MOB P PRE SHUT DOWN PUMPS AND LINE UP TO REVERSE CIRCULATE. PUMP SLACK BACK IN TO COIL. CIRCULATE AT 2-BPM WITH 3500-PSI. HEAR E-LINE MOVING. I ONCE MOVEMENT STOPS, BLOW AIR BACK i THROUGH COIL TO HELP DRY COIL FOR CUTTING. 04:00 - 06:30 1 2.50 MOB P 1 PRE POP OF WELL. RU CT CUTTER ON BOTTOM OF INJECTOR. CUT 234'OF COIL. RD CT CUTTER. I PUMP SLACK FORWARD UNTIL E-LINE SEEN. BHI TEST CONDUCTIVITY-GOOD. INSTALL SLB CTC. 06:30 - 16:00 9.50 BOPSUR P PRE START BQP TEST. TEST WITNESS WAS WAIVED BYAOGCC INSPECTOR MATT HERRERA. -, TEST CHOKE VALVES,ANNULAR, UPPER I �,_'R AND LOWER 2"PIPE/SLIP RAMS,2-3/8" Ii PIPE/SLIP RAMS, BLIND SHEAR RAMS,TIW VALVE, INNER REEL VALVE AND CT 'PACKOFF. NO TEST FAILURES. 16:00 - 16:30 0.50 MOB PPRE 'MOVE INJECTOR OVER TO CIRC HOLE AND PUMP FRESH WATER OUT. PJSM WITH BPV CREW FOR LOADING BPV LUBRICATOR ONTO RIG. 16:30 19:15 2.75 ZONISO P WEXIT LOAD DSM LUBRICATOR ONTO RIG AND PRESSURE TEST TO 250 PSI/3500 PSI. HOLD AND CHART EACH TEST FOR 5-MINUTES. DISCUSS POTENTIAL OF NEEDING MORE THAN ONE OA BLEED DURING WELL KILL TOPS BASED ON PRE RIG L&K(2 OA BLEEDS REQUIRED)WITH CTD WTL. APPROVED MORE THAN ONE BLEED AS LONG AS NO OTHER INTEGRITY ISSUES INDICATED. 19:15 - 19:30 ' 0.25 ' ZONISO P WEXIT HOLD RIG EVAC DRILL WITH MEINHOLD CREW. 1 ALL CREW MEMBERS AND ADDITIONAL PERSONNEL ON LOCATION RESPONDED TO THE PRIMARY MUSTER AREA BASED ON WIND DIRECTION. i I NO ISSUES WERE NOTED IN AAR. 19:30 - 20:00 0.50 ZONISO 1 P 1 WEXIT I OPEN SSV AND MASTER VALVE. I I I CUBRICA I EDUT BPV. WELL ON VAC. CLOSE MASTER&SSV. LD LUBRICATOR AND BPV. CLOSE SWAB VALVE&OPEN SSV. Printed 9/6/2011 9:09:15AM North America-ALASKA- BP Page 3 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-0OYW1-C X3-0OYW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase • Description of Operations (hr) (ft) 20:00 - 21:00 1.00 KILLW P WEXIT •FINISH BRINGING ON 8.5-PPG 2%KCL TO PITS. RU BLEED TRAILER IN PREP OF BLEEDING IA &/OR OA DURING BULLHEAD OPS. INSTALL FUSIBLE CAP ON SSV. I HOLD PJSM ON WELL KILL OPERATIONS. DISCUSS BULLHEAD PARAMETERS(RATE, • PSI,VOLUME), BLEEDING ANNULI CRITERIA, • POSITIONS OF PEOPLE AND THE IMPORTANCE OF COMMUNICATION IA/OA/PVT=115-PSI/40-PSI/457-BBLS. 21:00 - 22:15 1.25 KILLW P WEXIT OPEN MASTER&SWAB. LINE UP AND BULLHEAD 5-BBLS MEOH AT 1-BPM. I • FOLLOW WITH 8.5-PPG 2%KCL. STAGE UP TO RATE OF 5-BPM AND ZERO I VOLUME PUMPED. • ICP AT 5-BPM=500-PSI. SEE PRESSURE FLUCTUATION INDICATIVE OF DIFFERENT I I I DENSITY FLUIDS ENTERING FORMATION ' I(DIESEL FP, MEOH). CONTINUE TO BULLHEAD AT 5-BPM. FCP AT 5-BPM= 2626-PSI IA/OA=95-PSI/81-PSI. 22:15 - 23:00 0.75 KILLW P WEXIT FLOW CHECK WELL-ON A VAC. • CIRCULATE ACROSS THE TOP OF THE WELL ! 1 I MONITORING LOSS RATE. 10-MINUTE LOSS RATE=37-BPH. ESTABLISH CONTINUOUS HOLE FILL. IA/OA=100-PSI/131-PSI r— ! 1.00 WHIP P I, WEXIT PU INJECTOR AND INSTALL CHECKS INTO 23:00 - 00:00 • BHI UQC. BEGIN TESTING CHECKS TO 250-PSI/ 3500-PSI. • I HOLD AND CHART EACH TEST FOR 5-MINUTES. • MAINTAIN CONTINUOUS HOLE FILL WITH LOSS RATE=31-BPH. IA/OA=103-PSI/178-PSI. 7/21/2011 00:00 - 00:30 ! 0.50 WHIP P WEXIT CONTINUE TO TEST BHI DBPV TO 250-PSI/ I 3500-PSI. I HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TESTS. RD TEST EQUIPMENT. - — LOSS RATE=31-BPH. 00:30 - 01:30 1.00 WHIP P • WEXIT TROUBLESHOOT BAKER CHOKE. INDICATOR KNOB AND SHAFT WERE I JAMMED TOGETHER, KEEPING THE INDICATOR FROM TURNING PROPERLY. ADJUST COVER AND FUNCTION TEST- GOOD. IA/OA=104-PSI/214-PSI. 01:30 - 02:15 0.75 WHIP 1 P WEXIT HOLD PJSM WITH RIG CREW, BHI,BTT AND SLB ON MU WHIPSTOCK SETTING BHA. MU WHIPSTOCK SETTING BHA. BHA • CONSISTS OF:WHIPSTOCK,SETTING • SLEEVE, HYD SETTING TOOL, HOT, DGS, I DPS, EDC, P&C, LQC, UQC AND CTC. OAL= 167.03'. MAINTAIN CONTINUOUS HOLE FILL. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 4 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI: 500292033800 f Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:15 - 02:30 0.25 WHIP P WEXIT MU STRING TO COIL. STAB INJECTOR ONTO WELL. 02:30 - 05:30 3.00 WHIP P , WEXIT OPEN EDC AND ESTABLISH CIRCULATION DOWN COIL AT.47-BPM. RIH TO 200'BUT NOT ABLE TO ESTABLISH RETURNS. LINE UP TO CIRCULATE DOWN COIL AND FILL DOWN THE BACKSIDE AT THE SAME TIME. RIH AT 65-FPM,SLOWING THROUGH TUBING ,JEWELRY. CIRCULATE AT.45-BPM DOWN COIL AND '.60-BPM DOWN BACKSIDE. • LOSS RATE=30-BPH. IA/OA=105-PSI/240-PSI. 05:30 - 07:00 1.50 WHIP P WEXIT CONTINUE RIH. START LOGGING TO TOP SAG RIVER AT 10700 FT. 07:00 - 10:00 3.00 i WHIP h N DFAL WEXIT POOH FOR NBI SENSOR FAILURE. WHILE POOH,PJSM FOR UD AND CHANGE OUT FAILED BHA COMPONENT. 10:00 - 11:10 1.17 WHIP N DFAL WEXIT TAG STRIPPER AND FLOWCHECK WELL FOR 10 MIN. FILL WELL WITH 2.4 BBLS THEN OPEN CT RISER,STAND INJECTOR BACK IN CIRC HOLE. UD BHA AND SWAP OUT HOT. INSPECT PACKER AND SLIP ELEMENT AT - SURFACE,LOOKS FINE. ' M/U BHA#2-WHIPSTOCK PACKER.2.375"_ COILTRAK. BHA OAL=67.03 FT. 11:10 - 14:10 3.00 ( WHIP`- -= N DFAL WEXIT RIH BHA#2. PUMP DOWN CT AND ACROSS CT X TBG ANNULUS WHILE RIH TO KEEP - WELL FULL. 14:10 - 16:00 1.83 I WHIP P WEXIT LOG GR DOWN FROM 10700 FT TO CAPTURE TOP SAG RIVER. CORRECT-35 FT. LOG 25N SHALE AT 11258 FT, CORRECT-1 FT. 16:00 - 16:15 0.25 WHIP P WEXIT LOG CCL UP FROM 11360 FT,COLLARS ON MWD LOG MATCH LOCATION ON PDC LOG. 16:15 - 16:30 0.25 WHIP P WEXIT RUN TO 11366 FT AND PICK BACK UP TO ' SETTING DEPTH. PICK UP TO 11357.2 FT WHICH PLACES THE, TOP WHIPSTOCK AT 11348 FT.5 FT BELOW THE NEAREST COLLAR. CLOSE EDC. ZERO DWOB. CONTINUE FILLING THE CT X TBG ANNULUS. 1 PRESSURE UP CT TO 2800 PSI AND SHEAR OUT SETTING TOOL. SET 2.49K DWOB DOWN TO CONFIRM SET. 16:30 - 19:30 3.00 WHIP P WEXIT PICK UP 50 FT AND PT WELLBORE TO 1000 PSI FOR 15 MIN,GOOD. GET SLOW PUMP PRESSURES THEN POOH. IA/OA=125-PSI/280-PSI. 19:30 - 20:15 0.75 WHIP P WEXIT BUMP UP IN PACKOFF. FLOW CHECK-NO I FLOW. _LD WHIPSTOCK RUNNING BHA. NO ISSUES NOTED WITH SETTING TOOLS. 1 IIA/OA/PVT=130-PSI/280-PSI/340-BBLS. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 5 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT j NPT Depth Phase Description of Operations (hr) (ft) 20:15 20:30 0.25 STWHIP P WEXIT BHI RECONFIGURE TOOL STRING FOR MILLING WINDOW. 20:30 - 21:00 0.50 STWHIP P WEXIT HOLD PJSM WITH RIG CREW,SLB,BTT,AND BHI. DISCUSS WELL CONTROL CONSIDERATIONS, POSITIONS OF PEOPLE AND BHA RUNNING ORDER. MU WINDOW MILLING BHA. BHA CONSISTS OF HCC DSM WINDOW MILL, DSM,2-1/8" EXTREME MOTOR,XO,2-JTS OF 2-1/16"CSH, XO, BLIND SUB, DGS, DPS,EDC,P&C,WEAR SUB, LQC, UQC, CTC. OAL= 108.94' 21:00 - 21:30 0.50 STWHIP P WEXIT MU BHA TO COIL. STAB ON INJECTOR. OPEN EDC AND BREAK CIRCULATION AT .5-BPM. IA/OA/PVT=128-PSI/253-PSI/341-BBLS. 21:30 - 23:45 2.25 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA AT 75 TO 100-FPM, SLOWING THROUGH ALL PRODUCTION JEWELRY. CIRCULATE THROUGH OPEN EDC AT.5-BPM WITH 260-PSI. 23:45 00:00 0.25 STWHIP • P I WEXIT LOG TIE IN ACROSS TSGR FROM 10,890'TO 10901'. APPLY-33.5'CORRECTION. 7/22/2011 00:00 - 01:30 1.50 STWHIP. P WEXIT CONTINUE TO RIH FROM 10901'SLOWLY. DISPLACE WELL TO 8.6-PPG POWERPRO MUD AT 2.03-BPM WITH 3050-PSI. IA/OA=178-PSI/305 PSI. 01:30 02:00 0.50 STWHIP P WEXIT FILL PITS WITH 8.6 PPG POWERPRO MUD. ;CONTINUE CIRCULATING AT 1.47-BPM WITH !2330-PSI. CLOSE EDC. OBTAIN SPRS. PUMP#1 -.5-BPM/1.5-BPM WITH 1520/2770-PSI. PUMP#2-.5-BPM/ 1.5-BPM WITH 1560-PSI/2810-PSI. 02:00 - 02:30 0.50 STWHIP P 1 WEXIT RIH,CIRCULATING AT.2-BPM WITH 1230-PSI TO TAG TOP OF WHIPSTOCK AT 11350'. A PU OFF OF WHIPSTOCK WITH PU WT= 34.5K-LBS. BRING PUMP UP TO 1.6-BPM WITH 2675-PSI= FREE SPIN. WASH DOWN SLOWLY AND SEE MOTOR WORK START AT 11,350.5'. 02:30 - 07:00 4.50 STWHIP P WEXIT TIME MILL FROM 11,350.5'AT 1-FPH. CR ,TUBING CAUSING SLOW WEIGHT TRANSFER. IAT 11,351'-MILLING WITH 200-PSI MOTOR WORK AND 1.2K-LBS DHWOB. AT 11,351.5'-MILLING WITH 300-PSI MOTOR �✓ WORK AND 1.9K-LBS DHWOB. AT 11,352'-MILLING WITH 300-PSI MOTOR I WORK AND 2.1K-LBS DHWOB. I �� AT 11,352.5'-MILLING WITH 200-PSI MOTOR j WORK AND 1.6K-LBS DHWOB. AT 11,353'-MILLING WITH 100-PSI MOTOR WORK AND 1K-LBS DHWOB. 'AT 11,353.5'-MILLING WITH 70-PSI MOTOR WORK AND 1.1K-LBS DHWOB. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 6 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 09:50 2.83 ! STWHIP P ! WEXIT CONTINUE MILLING WINDOW. 08:30 11355.90 FT 0.81K 2800 PSI. AFTER 11356 FT DWOB DROPS OFF,LIKELY CASING EXIT AT THIS POINT. 09:20 11356.70 FT 0.59K 2670 PSI 709.50 - 11:30 1.67 r STWHIP P WEXIT VERY SLOW DRILLING AFTER EXPECTED CASING EXIT. KEEP ABOUT 1.5-2K DWOB, DRILL AT AROUND 3 FT/HR. 11:00 11359.29 FT 1.84K 2840 PSI. 11:30 - 15:10 3.67 STWHIP P WEXIT DRILL TO 11360 FT, PICKUP IS CLEAN. PICKUP TO SEE IF ANY HANGUPS. • SAMPLE FROM 11358 FT HAS HIGH PERCENTAGE OF FORMATION SAND. DRILL TO 11364.4 FT SLOWLY,NO FURTHER PROGRESS. 15:10 - 16:20 1.17 STWHIP P WEXIT PICK UP AND CLEAN UP WINDOW IN 3 UP/DOWN PASSES. BLEED OA FROM 830 PSI TO 100 PSI. 16:20 - 16:30 0.17 STWHIP P WEXIT STACK WT ON BOTTOM,TRY TO EXTEND RATHOLE,NOT ABLE TO. NO FURTHER PROGRESS DRILLING. PICK UP AND SHUT DOWN PUMP FOR DRY DRIFT. DRY DRIFT IS CLEAN. PICK UP FOR FLOW CHECK. 16:30 - 19:00 2.50 STWHIP P WEXIT PICKUP ABOVE WINDOW AND PERFORM 10 MIN FLOW CHECK. FLOW CHECK IS NEGATIVE,POOH. HOLD PJSM ON LD BHA WHEN NEAR SURFACE. 19:00 - 19:45 0.75 STWHIP P WEXIT FLOW CHECK WELL-STATIC. POP OFF INJECTOR&INSPECT COIL FOR 13CR80 WEAR. SET INJECTOR BACK. LD WINDOW MILLING BHA. • GAUGE MILLS. DSM=2.73"GO. STRING MILL =2.73"NO GO. NO ABNORMAL WEAR ON EITHER MILL. IA/OA/PVT=245-PSI/180-PSI/278-BBLS 19:45 - 20:15 0.50 DRILL P PROD1 CHECK TREE BOLT TORQUE-NO ISSUES. BLOW DOWN BHI TOOLSTRING, LD& RECONFIGURE. 20:15 - 20:45 0.50 DRILL P PROD1 HOLD PJSM ON MU BUILD DRILLING BHA. DISCUSS WELL CONTROL CONSIDERATIONS, STRING COMPONENTS AND POSITIONS OF PEOPLE. MU BUILD DRILLING BHA. BHA CONSISTS OF: 2.7"X 3"HYC BICENTER BIT(1:1, RE-RUN), 1.8-DEG AKO MOTOR, HOT, DGUS, DPS, EDC, P&c,WEAR SUB, LOC, UQC, AND CTC. OAL=58.25. 20:45 - 21:00 0.25 DRILL P PROD1 MU COIL TO BHA&STAB ON INJECTOR. !OPEN EDC AND BREAK CIRCULATION. IA/OA=215-PSI/70-PSI. 21:00 - 23:30 2.50 DRILL P PROD1 RIH WITH BUILD DRILLING BHA AT 95-FPM CIRCULATE AT.44-BPM WITH 1030-PSI. TIE IN TO TSGR. APPLY-34'CORRECTION. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 7 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 23:30 00:00 I 0.50 iDRILL P PROD1 I CONTINUE TO RIH. SHUT PUMPS OFF AND ORIENT TO 70L. RUN THROUGH WINDOW WITHOUT ISSUE. OBTAIN SPRS: PUMP#1 -.5-BPM/1600-PSI& 1.6-BPM/2840-PSI(FREE SPIN). CONTINUE TO RIH TO TAG BOTTOM AT I 11,364'. DRILL AHEAD TO 11,370'WITH 400-500-PSI MOTOR WORK AND 1K-LBS DHWOB. r — IA/OA/PVT=245-PSI/45-PSI/384-BBLS. 7/23/2011 00:00 - 02:15 I 2.25 1 DRILL P PROD1 DRILL AHEAD FROM 11 370'TO 11 500' FS=1.6-BPM/2460-PSI. DRILL WITH 800-400-PSI MOTOR WORK AND 2500-500-LBS DHWOB. STEADY ROP ABOVE 70-FPH. BUILDING ANGLE AND TURNING LEFT. IA/OA/PVT=275-PSI/95-PSI/384-BBLS. 02:15 - 04:00 1.75 DRILL P PROD1 WIPER TRIP FROM 11,500'AT 20-FPM. CIRCULATE AT 1.65-BPM WITH 2800-PSI. DROP PUMPS TO MIN RATE AND PULL • THROUGH WINDOW SLOWLY-NO ISSUES. CONTINUE TO POH TO 10805'. LOG TIE-IN PASS ACROSS TSGR FROM 10,805'. APPLY+1'CORRECTION. i RIH TO 11,270'. ,. , LOG TIE-IN PASS ACROSS TSAD AND RA TAG I 1 I(TAG IS AT 11,356'). , NO ISSUES THROUGH WINDOW. IA/OA=290-PSI/140-PSI. 04:00 - 08:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 11,500'. FS=1.6-BPM/2460-PSI. DRILL WITH 800-300-PSI MOTOR WORK AND I 1 2000-500-LBS DHWOB. I STILL BUILDING ANGLE AND TURNING LEFT. y__ I i .IA/OA/PVT=300-PSI/200-PSI/381-BBLS. 08:00 - 11:10 3.17 DRILL P 1 PROD1 i DRILL TO TD OF THE BUILD SECTION AT 111720 FT. POOH. I PUMP 0.4 BPM PULLING UP THROUGH WINDOW AT 70L, NOTHING SEEN. GET SPP FOR PUMP#1,2 THEN OPEN EDC. POOH, PUMP 2.06 BPM/3100 PSI THROUGH OPEN EDC. 11:10 - 13:15 2.08 DRILL P I, PROD1 TAG STRIPPER AND FLOWCHECK WELL. TRIP SHEET IS-2 BBLS. I PJSM FOR CHANGE OUT BHA. I L/D BHA#4. BIT IS 3-1 WITH CHIPPED ICUTTERS ON THE NOSE. I l M/U BHA#5-HCC BICENTER WITH RSM, 12-3/8"COILTRAK WITH RES. BHA OAL=64.35 FT. 13:15 - 15:30 2.25 DRILL P PROD1 RIH BHA#5. TIE-IN DEPTH FROM 10880 FT. CORRECT-33.5 FT. 15:30 - 16:00 0.50 DRILL P PROD1 RUN THROUGH WINDOW CLEAN AT 70L RIH,STACK WT AT 11500 FT AND BOUNCE THROUGH. GET SPP FOR BOTH PUMPS ABOUT 100 FT t – _ OFF BOTTOM. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 8 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft)_ 16:00 - 18:15 2.25 DRILL P PROD1 DRILL FROM 11720 FT.to 11825 FT. 1.73/1.73 BPM @ 2900-3300 PSI. r ROP IS 60 FT/HR WITH 0.97K DWOB. 18:15 - 18:30 0.25 DRILL P PROD1 BIT PARTIALLY PLUGS OFF-CIRCULATE AT .6-BPM WITH 3300-PSI WITH FULL RETURNS. POH SLOWLY AND SURGE PUMP PRESSURE TO TRY TO CLEAR NOZZLES. PUMP PRESSURE DROPS BUT STILL 1-BPM WITH 3500-PSI. DISCUSS SITUATION WITH CTD SUPERINTENDENT AND DECIDE TO POH. I- TAKE CHECK SHOT SURVEYS. IA/OA/PVT=312-PSI/245-PSI/383-BBLS. 18:30 - 21:00 2.50 DRILL N DFAL ' I PROD1 POH TO INSPECT BIT AT 30-FPM TO WINDOW. CIRCULATE AT 1-BPM WITH 3300-PSI. I PULL THROUGH WINDOW AT MIN RATE WITHOUT ISSUE. FLOW CHECK WELL-NO FLOW. OPEN EDC AND BREAK CIRCULATION. 1 CONTINUE TO POH,CIRCULATING AT i I1.75-BPM WITH 2470-PSI. HOLD PJSM ON LD BHA WHILE POH. 21:00 21:45 I 0.75_. DRILL N DFAL 1 _O I ' I4 PROD1 TAG UP IN INJECTOR. I FLOW CHECK-NO FLOW. UNSTAB INJECTOR. { f LD LATERAL DRILLING BHA#1. 2-SMALL PIECES OF RUBBER IN BIT. RIB STEER MOTOR LOCKED UP. 21:45 - 22:30 0.75 DRILL P ! PROD1 HOLD PJSM ON CUTTING COIL. CUT 150'OF COIL FOR CHROME MANAGEMENT. BHI CHANGE OUT RSM. 22:30 - 23:15 0.75 DRILL P PROD1 INSTALL SLB KENDALL CTC AND PULL TEST TO 30K-LBS-GOOD TEST. 23:15 - 00:00 0.75 DRILL P PROD1 HEAD UP BHI TOOLS. 7/24/2011 00:00 - 01:00 1.00 DRILL P PROD1 'PRESSURE TEST SLB KENDALL CTC-GOOD TEST. INSTALL CHECKS IN BHI HEAD. PRESSURE TEST BHI DBPV TO 250-PSI/ 3500-PSI. HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TEST. 01:00 - 01:30 i 0.50 DRILL ' N , DFAL PROD1 HOLD PJSM ON MU LATERAL BHA#2. MU LATERAL BHA#2. BHA CONSISTS OF:3"X 2.7"HCC BICENTER BIT,2-3/8"RSM, RESITIVITY,DGS,DPS,EDC,P&C,WEAR SUB, LQC,UQC&SLB CTC. OAL=64.35'. Printed 9/6/2011 9:09:15AM North America-ALASKA- BP Page 9 of 22 Operation Summary Report Common Well Name: 07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: 1X3-00YW1-C IX3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 05:00 1 3.50 DRILL N DFAL PROD1 MU BHA TO COIL AND STAB INJECTOR ON WELL. OPEN ECD AND ESTABLISH CIRCULATION AT .5-BPM WITH 1200-PSI. RIH WITH LATERAL DRILLING BHA#2. LOG TIE IN TO TSGR AT 10,850'. APPLY-34' CORRECTION. CONTINUE TO RIH. SET DOWN 5K-LBS AT 11,061'. PU AND ATTEMPT TO PASS WITHOUT SUCCESS. PU AND CLOSE ECD. CIRCULATE THROUGH BIT AT MIN RATE AND PASS 11,061'WITHOUT ISSUE. NO ISSUES PASSING THROUGH WINDOW. CONTINUE TO RIH AT 20-FPM CIRCULATING AT.9-BPM WITH 1970-PSI. SEE SLIGHT SET DOWN AT 11,500'. 'CONTINUE TO RIH WITHOUT ISSUE TO TAG BOTTOM AT 11,825' GET SPRS: PUMP#1 -.5-BPM/1460-PSI AND 1.6-BPM/2830-PSI. PUMP#2-.55-BPM/ 1490-PSI AND 1.6-BPM/2850-PSI. IA/OA/PVT=210-PSI/30-PSI. 105:00 - 06:30 I 1.50 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION FROM 11,825'. FS= 1.6-BPM WITH 2850-PSI. DRILL AHEAD WITH 100 TO 250-PSI MOTOR WORK AND 500 TO 1000-LBS DHWOB. IA/OA/PVT=250-PSI/60-PSI/370-BBLS. 06:30 - 10:00 3.50 DRILL P PROD1 CONTINUE DRILLING, HOLD AROUND 86 DEG INC FOR NOW TO FIND HOT. GO TO 25 FT SAMPLE INTERVALS. 1.61/1.61 BPM @ 2800-3000 PSI. 1 ROP IS AROUND 30-60 FT/HR WITH 1.5K DWOB. 10:00 - 12:00 I 2.00 DRILL P PROD1 CONTINUE DRILLING THROUGH LONG SHALE INTERVAL AT 11920 FT. ROP IS AROUND 10-20 FT/HR WITH GOOD WT TRANSFER. INCREASE CLAY-STOP TO 2.5% CONCENTRATION. 12:00 - 13:15 1.25 DRILL P PROD1 CONTINUE DRILLING MASSIVE SHALE INTERVAL, ROP AROUND 10 FT/HR. DRILL TO 11950 FT. 13:15 - 14:00 0.75 DRILL i P PROD1 WIPER TRIP TO WINDOW. MOSTLY CLEAN PASS, SLIGHT SETDOWN IN 11500 FT SHALES. 14:00 - 18:50 4.83 DRILL P 1 PROD1 DRILL FROM 11950 FT. ROP CONTINUES SLOW. REDUCE INC TO 85 DEG TO TRY AND DRILL OUT OF IT. AROUND 12000 FT ROP INCREASES TO 40-60 FT/HR FOR A SHORT TIME. ROP AGAIN INCREASES AT 12,065'WITH 60-70 FT/HR. IA/OA/PVT=430-PSI/470-PSI/383-BBLS. 18:50 - 20:00 1.17 DRILL P PROD1 WIPER TRIP FROM 12,100'TO WINDOW. NO ISSUES. HOLE IN GOOD CONDITION. GET SPRS AT 12,050'. PUMP#1 -.5-BPM/ 1530-PSI AND 1.6-BPM/2850-PSI. PUMP#2- .5-BPM/1550-PSI AND 1.6-BPM/2830-PSI. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 10 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 23:00 3.00 I DRILL P ! PROD1 DRILL AHEAD FROM 12,100'TO 12,250'. FS=1.6-BPM/2830-PSI. � DRILL AHEAD WITH 500-200-PSI MOTOR , WORK AND 1-2K-LBS DHWOB. NOT SEEING TAR IN SAMPLES SO BEGIN TO I BUILD ANGLE TO COME UP ABOVE 13N. THEN SEE TAR IN SAMPLE SO LEVEL OUT. 1 IA!OA/PVT=440-PSI/490-PSI/381-BBLS. 23:00 23:45 0.75 DRILL P I, PROD1 WIPER TRIP FROM 12,250'. 1 CIRCULATE AT 1.58-BPM WITH 2920-PSI. DROP PUMPS TO MIN RATE BEFORE I PASSING THROUGH WINDOW. IA/OA=445-PSI/510-PSI. 23:45 - 00:00 0.25 DRILL P PROD1 LOG TIE IN TO RA TAG. APPLY+3' I CORRECTION. PULL BHA THROUGH WINDOW WITHOUT ISSUE. MAKE 30'JOG ABOVE WINDOW. OPEN EDC AND ESTABLISH CIRCULATION AT 2-BPM WITH 3100-PSI. 7/25/2011 00:00 - 00:30 0.50 DRILL P PROD1 CCL LOG FOR LINER TOP PLACEMENT FROM 11,345'TO 10,850'AT 15-FPM. CIRCULATE THROUGH OPEN EDC AT .2.04-BPM WITH 3050-PSI. 00:30 - 01:00 0.50 DRILL P . PROD1 RIH FROM 10,850'. STOP AT 11,000'AND CLOSE EDC. ESTABLISH CIRCULATION THROUGH MOTOR F AND BIT. RIH, CIRCULATING AT MIN RATE. NO ISSUES ENTERING LINER AT 11,061'. SHUT DOWN PUMP AND RUN THROUGH 'WINDOW WITHOUT ISSUE. 01:00 - 01:40 0.67 DRILL r P PROD1 WIPER FROM WINDOW BACK TO 12,250'. ' CIRCULATE AT 1-BPM WITH 2076-PSI 1 !THROUGH BUILD SECTION. � ! IBRING PUMP UP TO 1.6-BPM WITH 2880-PSI IN LATERAL. HOLE IN GOOD SHAPE-NO ISSUES NOTED iON TRIP. I IA/OA=430-PSI/505-PSI. 01:40 07:30 5.83 DRILL P . PROD1 .DRILL AHEAD FROM 12,250'TO 12,400'. FS= 1.6-BPM WITH 2850-PSI. PER GEO BUILD ANGLE UP TO GET TO 8950' , TVD AND THEN HOLD 90-DEG INCLINATION FROM THERE. , I MOTOR WORK AT 200-600-PSI WITH 1000-1700-LBS DHWOB. ROP FROM 70-120-FPH. AT 12,310', ROP SLOWS TO 10-30 FPH. INCREASE DHWOB TO 2500 TO 1500-LBS. MOTOR WORK STILL 200-700-PSI. AT 12,345', ROP IMPROVES AGAIN. PARAMETERS REMAIN THE SAME. MAKE BHA WIPER AT 12,370'. IA/OA/PVT=465-PSI/550-PSI!375-BBLS. DRILL TO 12,400 FT. 07:30 - 09:00 1.50 DRILL P t PROD1 WIPER TRIP FROM 12400 FT TO WINDOW, T SOME MOTOR WORK SEEN AT 12122 AND 11713 FT GOING UP. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 11 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: tX3-00YW1-C 1X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs I Task 1 Code NPT NPT Depth i Phase Description of Operations (hr) 1 (ft) 09:00 - 12:20 3.33 I DRILL -1 P tPROD1 BACK ON BOTTOM DRILLING. 1 GET SPP FOR PUMP#1,2. DRILL FROM 12400 FT. REDUCE INC TO 90 DEG FOR NOW TO STAY JUST ABOVE THE HOT. DRILL AT 1.60/1.60 BPM 3000-3250 PSI. ROP IS 40-80 FT/HR AFTER 12400 FT. SWAP TO NEW MUD AFTER 12450 FT, ROP GOES TO 80-100 FT/HR. DRILL TO 12550 FT. 12:20 - 14:10 1.83 DRILL P PROD1 WIPER TRIP FROM 12550 FT TO WINDOW. SLIGHT MOTOR WORK SEEN AT 11492 FT. 14:10 - 17:00 2.83 DRILL P PROD1 DRII L FROM 12550 FT. CONTINUE HOLDING 90 DEG INC. GET NEW SPP AFTER MUD SWAP. DRILL AT 1.60/1.58 BPM @ 3000-3300 PSI. I I 1 ROP IS 60-90 FT/HR WITH 1.4K DWOB. _ I ! DRILL TO 12,700 FT. 17:00 - 19:45 2.75 t DRILL P PROD1 WIPER TRIP FROM 12,700 FT. NO ISSUES NOTED ON TRIP OR THROUGH WINDOW. I WASH TO 11,000'TO CLEAN OUT ABOVE ' LINER. TIE IN TO RA TAG. APPLY+5'CORRECTION. j I SEE SLIGHT SET DOWN AT TOP OF 13N AT 11,870'. GET SPRS-PUMP#1: .5-BPM/1620-PSI& 1.6-BPM/3110-PSI. PUMP#2: .5-BPM/ 1590-PSI&1.6-BPM/3025-PSI. 19:45 - 21:30 1.75 DRILL P I PROD1 DRILL AHEAD FROM 12,700'to 12850'. FS=1.6-BPM TIH 3080-PSI. DRILL AHEAD DROPPING ANGLE SLIGHTLY I WTO STAY JUST ABOVE HOT. DRILL WITH 200-650-PSI MOTOR WORK AND 1 1 1000-2300-LBS DHWOB. IA/OA/PVT=417-PSI/452-PSI/390-BBLS. 21:30 - 23:45 1 2.25 DRILL P PROD1 WIPER TRIP FROM 12,850'AT 22-FPM. I CIRCULATE AT 1.6-BPM WITH 3100-PSI. I SEE SLIGHT MOTOR WORK WHEN POH PAST 111,570'AND 11,480'. 1 REDUCE PUMP RATE TO 1-BPM WHEN RIH 1 1 _ PAST 11,500'SHALES. 23:45 - 00:00 i 0.25 DRILL P PROD1 'DRILL AHEAD FROM 12,850'TO 12,886'. FS=3200-PSI AT 1.6-BPM. DRILL AHEAD WITH 300-500-PSI MOTOR I WORK AND 1000-2000-LBS DHWOB. IA/OA/PVT=445-PSI/486-PSI/401-BBLS (MUD AIRED UP DUE TO CENTRIFUGES). Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 12 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C 1X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth i Phase Description of Operations (hr) (ft) 7/26/2011 100:00 - 02:30 2.50 DRILL P PROD1 DRILL AHEAD FROM 12,886'TO 13,000'. I FS=3200-PSI AT 1.6-BPM. i DRILL AHEAD WITH 300-500-PSI MOTOR WORK AND 1000-2000-LBS DHWOB. VERY HIGH ROP>120-FPH. DRILL 65'AND MAKE SHORT WIPER-NO ISSUES. ROP SLOWS AT 12,926'. HAD BEEN HOLDING 88-DEG INCLINATION AND NBI CLIMBS SLIGHTLY. AS DRILL AHEAD,RESISTIVITY INDICATES FAULT AT 12,918'. ROP VARIABLE AFTER 12,926'. MAKE SHORT WIPER AT 12,950'. ROP IMPROVES AGAIN AT 12,951'. CONTIUE TO HOLD 88-DEG INC TO STAY JUST ABOVE I HOT. _ IA/OA/PVT=450-PSI/500-PSI/400-BBLS. 02:30 - 04:45 2.25 DRILL P PROD1 WIPER TRIP FROM 13,000' CIRCULATE AT 1.6-BPM WITH 3200-PSI. HOLD KICK WHILE TRIPPING DRILL&AAR WITH JOHN KELLY'S CREW. CREW WAS SHORT ONE FLOOR HAND AND ROUSTABOUT STEPPED UP CORRECTLY. ENTIRE RIG CREW RESPONDED QUICKLY ,AND PROPERLY. ' NO ISSUES NOTED ON TRIP. IA/OA=480-PSI/560-PSI. 04:45 - 08:40 3.92 DRILL P PROD1 DRILL AHEAD FROM 13,000'TO 13,150'. FS= 1.6-BPM WITH 3200-PSI. = DRILL WITH 200-600-PSI MOTOR WORK. KEEP 500-2500-LBS DHWOB. MAINTAIN 88-DEG INCLINATION TO STAY I JUST ABOVE HOT. ROP VARIABLE WITH PERIODIC STALLS. MAKE SHORT WIPER FROM 13024'. IA/OA/PVT=495-PSI/575-PSI/391-BBLS. 08:40 - 10:00 1.33 DRILL I P r PROD1 WIPER TRIP FROM 13,150'. CIRCULATE AT 1.6-BPM WITH 3200-PSI. NO ISSUES NOTED ON TRIP. 10:00 - 11:30 1.50 DRILL P PROD1 OPEN EDC,JET TOP OF LINER,CLOSE EDC, RIH TO TIE IN DEPTH AT 11370. TIE IN CORRECTION OF+6 FT. 11:30 - 12:50 1.33 DRILL P PROD1 I RIH TO BOTTOM AT 13,150'CTMD. . 12:50 - 15:20 2.50 DRILL P PROD1 !DRILL AHEAD FROM 13,150'TO 13,300'. FS=1.5-BPM WITH 3300-PSI. DRILL WITH 200-600-PSI MOTOR WORK. KEEP 500-2500-LBS DHWOB. MAINTAIN INCLINATION TO STAY JUST ABOVE HOT. ROP VARIABLE 50-100 FPH WITH PERIODIC j STALLS. IA/OA/PVT=550-PSI/680-PSI/361-BBLS. 15:20 - 18:20 3.00 DRILL P PROD1 WIPER TRIP FROM 13,300'. ICIRCULATE AT 1.6-BPM WITH 3200-PSI. NO ISSUES NOTED ON TRIP OTHER THAN ONE TAG UP AT 13200'CTMD. PU, REDUCE PUMPS TO 1 BPM, RIH PAST 13200 WITHOUT PRESSURE OR WEIGHT ISSUES. RIH TO BOTTOM AT 13300'CTMD Printed 9/6/2011 9:09:15AM worth America -ALASKA- BP Page 13 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C JX3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:20 - 20:15 1.92 DRILL P PROD1 ATTEMPT TO DRILL AHEAD FROM 13,300- NUMEROUS MOTOR STALLS. MOTOR STATOR RUBBER PIECES FOUND IN BU SAMPLE. FS= 1.5-BPM WITH 3200-PSI. IA/OA/PVT/ECD=560-PSI/695-PSI/ 360-BBLS./10.15 20:15 - 22:00 1.75 DRILL P PROD1 POH TO 11,300' 22:00 - 22:10 0.17 DRILL P PROD1 FLOWCHECK WELL-STATIC OPEN EDC. 22:10 - 00:00 1.83 DRILL P PROD1 POH WITH BHA#6 7/27/2011 00:00 - 00:25 0.42 DRILL ! P PROD1 POH WITH BHA#6 00:25 - 00:35 0.17 DRILL P PROD1 FLOWCHECK WELL-STATIC. CLOSE EDC. PJSM FOR BHA. 00:35 - 01:00 0.42 DRILL P r PROD1 SET BACK INJECTOR. L/D AND INSPECT BHA#6 BIT GRADE. 3-1-CT-N-X-I-BU-DMF ONE NOZZLE PLUGGED W/STATOR RUBBER. PVT/IA/OA=300 BBLS/425/668 01:00 - 01:40 0.67 DRILL P I PROD1 PERFORM BI-WEEKLY BOP FUNCTION • 01:40 02:45 1.08 DRILL P TEST. FUNCTION FROM BOTH REMOTE STATIONS. - PROD1 PJSM,INSTALL LUBRICATOR QUICK TEST SUB. t t CLOSE MASTER AND SWAB VALVES. TEST UPPER AND LOWER LUBRICATOR ,CONNECTIONS TO- I250/3500 PSI FOR 5 MIN. EACH. OPEN MASTER AND SWAB,SET BACK • INJECTOR. 02:45 - 04:25 1.67 DRILL P t PROD1 PJSM,M/U BHA#7 INSTALL NEW DFC VALVES AND TEST TO 250 /1500 PSI 5 MIN. EACH. NEW 3"BI-CENTER BIT,NEW 2 3/8"RSM, USR, DGS, DPS, EDC, PC,WS, LOC, UQC, CTC. M/U INJECTOR. 04:25 - 04:50 0.42 DRILL P PROD1 PRESSURE TEST QTS TO 250/3500 PSI.5 MIN EACH. 04:50 - 07:00 2.17 DRILL P PROD1 'RIH AND CORRELATE BHA#7. -35' CORRECTION. 07:00 - 08:30 1.50 DRILL N RREP 11,299.98 PROD1 STAND BY AT WINDOW WHILE ADJUSTING MICRO MOTION. MICRO MOTION IS READING 0.00 BPM OUT ANYTIME FLOW IS LESS THAN 0.5 BPM. READING IS CORRECT ABOVE 0.5 BPM. SOFTWARE ADJUSTMENT CORRECTED PROBLEM. 08:30 - 10:00 1.50 DRILL P PROD1 RIH TO BOTTOM AT 13300'MD. SAW OBSTRUCTION AGAIN AT 13200'. CYCLE PUMPS AND ABLE TO PASS. 10:00 - 11:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 13,300'TO 13,360'. FS= 1.5-BPM WITH 3300-PSI. DRILL WITH 200-600-PSI MOTOR WORK. TROUBLE KEEPING WEIGHT ON BOTTOM. GOOD ROP 150+FPH WHEN ACTUALLY ON BOTTOM. IA/OA/PVT=490-PSI/580-PSI Printed 9/6/2011 9:09:15AM "forth America -ALASKA- BP Page 14 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: 1X3-00YW1-C IX3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA I UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth j Phase Description of Operations (hr) (ft) 11:00 - 12:15 1.25 ,DRILL P f PROD1 DISPLACE WELBORE TO FRESH MUD SYSTEM WHILE WORKING PIPE OLD MUD 8.7 PPG,NEW MUD 8.8 PPG. 12:15 - 14:25 2.17 DRILL P I PROD1 RIH TO BOTTOM @ 13,360'AND RESUME DRILLING. DRILL 13,360-13,450'. SO WEIGHT-13K. � FREE SPIN=2800 PSI AT 1.6 BPM. DRILL WITH 200-800-PSI MOTOR WORK. NO LOSSES TO HOLE TO THIS POINT. 14:25 - 17:15 2.83 DRILL P . PROD1 WIPER TRIP FROM 13,450'TO 11,375'. CIRCULATE AT 1.6-BPM WITH 2950-PSI. HOLD SPILL DRILL&AAR WITH MATT MEINHOLD'S CREW. RIG CREW RESPONDED WELL. • SAW BRIEF MOTOR WORK AT 13,200 ON POH. i ! RIH IA/OA=520-PSI/600-PSI. 17:15 00:00 6.75 DRILL P ' + PROD1 BACK ON BOTTOM DRILLING FROM 13,450' . FS=2900 PSI @ 1.59 BPM. ROP=7 FPH. 2-4K WOB. 75-150 PSI MOTOR WORK. DIFFICULT TO TRANSFER WEIGHT TO BIT. 8.85/8.85 IN/OUT. ECD/IA/OA/PVT= 10.10/554 PSI/682 PSI/ 367 BBLS. DRILLING TO 13506' 7/28/2011 00:00 02:20 2.33 DRILL ; P PROD1 r)RII L AHEAD FROM 13.506'TO 13.543',.- 1 FS=3250 PSI @ 1.76 BPM. ROP=7 FPH. '2-4K WOB. 100-200 PSI MOTOR WORK. DIFFICULT TO TRANSFER WEIGHT TO BIT. 8.83/8.85 IN/OUT. BHP=5199 PSI. i ECD/IA/OA/PVT= 10.15/280 PSI/297 PSI/ t 365 BBLS. 02:20 - 03:55 1.58 DRILL P ' PROD1 •POH FOR AGITATOR TO 11.300' 03:55 - 04:05 0.17 DRILL : P PROD1 j FLOWCHECK WELL-STATIC. OPEN EDC. 04:05 - 06:15 2.17 DRILL I P PROD1 POH PUMPING 2.25 BPM FLOWCHECK WELL-STATIC. I CLOSE EDC. ' PJSM FOR BHA. 06:15 - 06:45 0.50 DRILL P PROD1 SET BACK INJECTOR. L/D AND INSPECT BHA#7 BIT GRADE. 2-1-CT-N-X-I-PN-BHA ONE NOZZLE PLUGGED W/STATOR RUBBER. I 06:45 - 07:45 1.00 DRILL P PROD1 PJSM, MN BHA#8 NEW 3"HYCALOG SRX3408M-61 BI CENTER BIT, 2-3/8"BAKER XTREME MOTOR @ 1.1 DEG, FVS,AGITATOR, HOT, USR, DGS, DPS, EDC, PC,WS, LOC, UQC,CTC. M/U INJECTOR. 07:45 - 08:30 P 0.75 DRILL P PROD1 FILL HOLE-2 BBLS TO FILL. IFUNCTION TEST AGITATOR-TURNED ON AT 0.9-1.0 BPM PRESSURE TEST QTS TO 250 PSI LOW,3500 PSI HIGH PRESSURE I 08:30 - 11:00 2.50 DRILL P PROD1 RIH AND CORRELATE BHA#8. -36' 1 I CORRECTION. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 15 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW 1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 12:45 ' 1.75 DRILL P PROD1 RIH TO 13,500'MD. NO OBSTRUCTIONS ON TRIP IN HOLE. RECORD NEW KILL RATE PRESSURES. PU-40.5K,SO-13.2K, FREE SPIN-3400 PSI —i- @ 1.5 BPM 12:45 - 17:45 5.00 DRILL P 1 PROD1 RIH&TAG FILL AT 13,535'AND WORK THROUGH. DRILL AHEAD FROM 13,543'TO 13,625' FS=3350 PSI @ 1.50 BPM. ROP=5-FPH. 1-3K WOB. 100-400 PSI MOTOR WORK. 8.84/8.84 IN/OUT. ECD/IA/OA/PVT= 10.38/350 PSI/350 PSI/ 340 BBLS. 17:45 - 18:45 1.00 DRILL I PP PROD1 [DRILL AHEAD FROM 13,625'-13,700' ROP BROKE THROUGH TO 60-100 FPH. 250-300 PSI MOTOR WORK 18:45 20:30 1.75 DRILL P PROD1 WIPER TRIP FROM 13,700 TO 11,376' 25 FPM,3350 PSI 1.5 BPM. ONE 5K OVERPULL©11,884' 20:30 - 22:35 2.08 DRILL P PROD1 RIH 23 FPM 1.49 BPM @3350 PSI. MOTOR WORK AT 11,900'AND 11,995' RECORD NEW KILL RATE PRESSURES. 22:35 - 00:00 1.42 DRILL I P PROD1 I)RII LING AHEAD FROM 13,700' FS=3500 PSI @ 1.49 BPM. ROP=65-75 FPH. .5-1K WOB. 100-250 PSI MOTOR WORK. i i 8.86/8.86 IN/OUT. BHP=5921 PSI. i ECD/IA/OA/PVT= 10.49/405 PSI/415 PSI/ 1341 BBLS. HELD SIMULATED FIRE DRILL AT THE POWERPACK. 'AAR-GOOD RESPONSE BY CTD SIMULATING SHUTTING DOWN POWERPACK. I QUICK RESPONSE BY RIG CREW AT THE SCENE. DRILL TO 13,801' 7/29/2011 00:00 - 01:45 1.75 DRILL P PROD1 DRILLING AHEAD FROM 13,801' FS=3500 PSI @ 1.49 BPM. ROP=25-35 FPH. I.5-1K WOB. 100-200 PSI MOTOR WORK. '8.86/8.89 IN/OUT. BHP=5842 PSI. ECD/IA/OA/PVT= 10.49/403 PSI/424 PSI/ 1338 BBLS. — — DRILL TO 13,850' - 01:45 - 03:25 1.67 DRILL P PROD1 'WIPER TRIP FROM 13,850'TO 11,380' 5K OVERPULLS©13,565, 13,540 AND 13,527' 03:25 - 05:10 ' 1.75 DRILL P PROD1 RIH 25 FPM,1.5 BPM @ 3500 PSI.MOTOR WORK AT 13,493'. HOLE TOOK 10 BBLS ON WIPER TRIP. PVT=325 BBLS. 4 r 05:10 - 08:00 1 2.83 DRILL P PROD1 ON BOTTOM DRILLING FROM 13,850 TO 14,001. FS=3500 PSI @ 1.5 BPM.ROP=25-30 FPH 1-2K WOB.200-250 PSI MOTOR WORK. 8.89/8.87 IN/OUT. BHP=5910 PSI. ECD/IA/OA/PVT= 10.55/464 P -_—' [SIJ 480 PSI/325 BBLS. 08:00 - 09:45 1.75 DRILL P PROD1 WIPER TRIP FROM 14,001'TO 10,975' NO OVERPULLS ON TRIP OUT, -100 PSI OF MOTOR WORK AT 11800-11850 L LOST 4 BBLS ON WIPE OUT OF HOLE. Printed 9/6/2011 9:09:15AM ^forth America -ALASKA- BP Page 16 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-O0YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:45 - 10:30 0.75 DRILL P PROD1 OPEN EDC,JET TOP OF LINER,CLOSE EDC, RIH TO TIE IN DEPTH AT 11370. TIE IN CORRECTION OF+6 FT. 10:30 - 12:30 2.00 DRILL P PROD1 RIH FROM 10,975 TO 13,375 CTMD. BASED ON SAMPLES AND LOGS, DECISION MADE BY ASSET TO MU BILLET AND SIDETRACK. 13,330'CTMD WIPE DOWN TO 13,375 AND SEND 20 BBL HI VIS SWEEP. CHASE SWEEP OUT OF HOLE. 23 FPM,1 BPM 2500 PSI. ECD/IA/OA/PVT=9.88/408 PSI/464 PSI/ 304 BBLS. 12:30 14:10 1.67 STKOH N DPRB 14,001.00 PROD1 POH CHASING SWEEP FROM 13,375 TO WINDOW @ 11,300. j SAW—300 PSI MOTOR WORK AT 11,850 AND 11,725. 1 NO OVERPULLS MORE THAN 1-2K TO WINDOW. LOST 5 BBLS ON TRIP TO WINDOW. 14:10 - 14:30 0.33 STKOH N DPRB 14,001.00 PROD1 FLOWCHECKWELL-STATIC. OPEN EDC. 14:30 - 16:30 2.00----. STKOH- N DPRB 14,001.00 ' PROD1 POH PUMPING 1.8 BPM ' FLOWCHECK WELL-STATIC. CLOSE EDC. PJSM FOR BHA. LOST LESS THAN 1 BBL ON TRIP OUT FROM WINDOW. 16:30 - 17:30 1.00 STKOH N DPRB 14,001:00 PROD1 SET BACK INJECTOR. L/D AND INSPECT BHA#8 BIT GRADE. 4-1-BT-N-X-I-CT-BHA. 17:30 - 18:30 1.00 STKOH N DPRB 1 14,001.00 PROD1 PJSM-LOAD BILLET AND RUNNING TOOLS . ONTO RIG. CONDUCT CREW CHANGE,CHECK EQUIPMENT STATIS. DISCUSS ONGOING OPERATIONS. HOLD DETAILED PJSM FOR P/U BHA#9 FOR OPEN HOLE SIDETRACK. _ 18:30 - 19:35 1.08 STKOH N DPRB 14,001.00 PROD1 M/U BHA#9 OHST ASSY. 2.625"OH ANCHOR WITH 1/2 SLIP DESIGN- SINGLE SLIP UP,2.625"OH ALUM. BILLET, SETTING SLEEVE,BOT#10 J HYD.,XO,XO, HOT, USR, DGS, DPS, EDC, PC,WS, LQC, UQC, CTC. SCRIBE BILLET TO MWD 0 DEG. HS. M/U INJECTOR.TEST QTS TO 250/3500 PSI-5 MIN. EACH. 19:35 - 22:15 2.67 STKOH N DPRB 14,001.00 PROD1 OPEN EDC. ESTABLISH CIRCULATION .3BPM 1150 PSI. RIH WITH OHST BHA#9 70 FPM.TO 10,880' 22:15 - 22:30 0.25 STKOH N DPRB 14,001.00 ' PROD1 LOG TIE IN AT 10,875.15',-35'CORRECTION. CLOSE EDC. 22:30 - 00:00 1.50 STKOH N DPRB 14,001.00 PROD1 WITH PUMP OFF RIH 40 FPM.TO 11,300' S/O= 15K, P/U=36K. PASS THROUGH WINDOW AT 11,350'CLEAN. RIH 30 FPM TO 13,336'-NO OBSTRUCTIONS. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 17 of 22 Operation Summary Report Common Well Name: 07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/30/2011 00:00 - 01:20 1.33 STKOH N DPRB 14,001.00 PROD1 CONFIRM ORIENTAITION 0 DEG.HS. LOTH TOP OF BILLET 13.325' BOTTOM OF ANCHOR @ 13,336' PRESSURE UP TO 4200 PSI AND SHEAR OUT. SLIPS SET @ 13,335' SET DOWN TO CONFIRM BILLET IS ANCHORED. CANNOT TRANSFER DHWOB, POSSIBLE COIL LOCKUP. SET DOWN SEVERAL TIMES STACKING - 10K COIL SURFACE WEIGHT- READING OK DHWOB. P/U TO STRING WEIGHT @ 40K- BREAKOVER WT @ 13,336' INDICATING BILLET IS SET. PVT=286 BELS, IA= 146 PSI, OA=95 PSI 01:20 - 02:30 1.17 STKOH N DPRB 14,001.00 PROD1 POH FOR SIDE TRACK BHA. PUMPING 1 BPM 2300 PSI. POH TO 11,285' 02:30 - 02:40 0.17 STKOH N DPRB 14,001.00 PROD1 OPEN EDC. FLOW CHECK WELL-STATIC. 02:40 - 04:50 2.17 , STKOH N DPRB 14,001.00 PROD1 CONTINUE POH. 04:50 - 05:00 0.17 STKOH N DPRB 14,001.00 PROD1 FLOWCHECK WELL-STATIC. CLOSE EDC. 05:00 - 05:30 0.50 STKOH N DPRB 14,001.00 PROD1 SET BACK INJECTOR. I PVT=232 BBLS. WELL TOOK 4 BBL ON BILLET TRIP. I L/D BILLET RUNNING BHA#9. LOAD OUT RUNNING TOOLS. 05:30 - 07:00 1.50 STKOH N DPRB 14,001.00 PROD1 M/U BHA#10.NEW HYCALOG SRR3408MB7Z 3"BI-CENTER BIT,2.375"X-TREME MM W/1.1 DEG BEND,AGITATOR,FVS,HOT,USR,DGS, DPS,PC,WS,LQC,UQC W/O CHECKS,CTC 07:00 - 07:45 0.75 STKOH N DPRB 14,001.00 PROD1 FILL HOLE--1.5 BBLS TO FILL. FUNCTION TEST AGITATOR-TURNED ON AT 0.9-1.0 BPM PRESSURE TEST QTS TO 250 PSI LOW,3500 PSI HIGH PRESSURE 07:45 - 09:45 , 2.00 STKOH N ! DPRB 14,001.00 PROD1 RIH AND CORRELATE BHA#10. -36' CORRECTION. 09:45 - 10:25 0.67 STKOH N DPRB 14,001.00 PROD1 RIH FROM WINDOW AT 11350-11890'MD. 25 FPM,1.0 BPM.SET DOWN AT 11890' 10:25 - 11:05 0.67 STKOH N DPRB 14,001.00 PROD1 SET DOWN WHILE RIH THROUGH @ 11890 (SHALE ON LOG 11870-11960). VARY TOOLFACES AND REDUCE PUMPS TO 0.5 BPM WHILE RIH TO WORK PAST. SET DOWN AT 11900 STILL. PU TO UPWEIGHT AT 11900, INCREASE PUMPS TO 1.4 BPM AND BACKREAM TO 11800'. RIH AGAIN AT 0.5 BPM AND ABLE TO WORK PAST DOWN TO 12100'. BRING PUMPS PACK UP TO 1.4 BPM AND BACKREAM SHALE ONCE AT 15 FPM TO 11,800'MD. REDUCE PUMPS AGAIN AND RIH PAST SHALE W/2-4K WEIGHT SPIKES AND THREE 200-300 PSI MOTOR WORK SPIKES. Printed 9/6/2011 9:09:15AM North America -ALASKA- BP Page 18 of 22 Operation Summary Report Common Well Name: 07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task : Code ! NPT NPT Depth Phase Description of Operations (hr) - (ft) 11:05 - 12:15 1.17 T STKOH 7 N f DPRB 14,001.00 PROD1 CONTINUE RIH FROM 11,980 TO 13,250 25 FPM,1.5 BPM,3520 PSI. SO-15.7K, PU-37K TAKE KILL RATE PRESSURES. LOST TOTAL OF 4 BBLS WHILE RIH FROM SURFACE. ECD/IA/OA/PVT= 10.35/189 PSI/107 PSI! 279 BBLS 91 BBLS ADDITIONAL MUD IN PITS OFF OF ACTIVE SYSTEM. 12:15 - 12:45 0.50 STKOH N I DPRB 14,001.00 PROD1 TAG TOP OF BILLET TAG TWICE BRIEFLY W/0.25 BPM AT SAME DEPTH TO CONFIRM NO FILL AND AVOID PLUGGING NOZZLE. SHUT DOWN PUMPS AND DRY TAG AT 13,324.7'TD. SLACK OFF ON TOP OF BILLET TO 11800 COIL WEIGHT AND READ 3.5K DWOB TO CONFIRM ANCHORS HOLDING. PU. BRING PUMPS TO 1.5 BPM 3600 PSI. RIH 2.6 FPM AND SEE FIRST MOTOR WORK AT 13324.2'. PU AGAIN AND RIH TO 13324'. 12:45 - 13:15 I 0.50 STKOH N DPRB 14,001.00 PROD1 BEGIN TIME DRILLING ON BILLET AT 13224.0' . (0.2 TENTHS ABOVE PUMPS ON TAG). TIME DRILL AT 1 FPH FOR 0.5 FEET BUT SEE NO SIGN OF DOWNHOLE WEIGHT OR MOTOR WORK WHILE INCHING IN. STKOH N DPRB 13:15 - 14:35 1.33 F 14,001.00 PROD1 PICKUP AND RE-RIH-5FPM TO 13324.2'. SEE -50 PSI MOTOR WORK AND 1.16K DWOB. CONTINUE WORKING PIPE INTO HOLE-5FPH TO MAINTAIN SLIGHT PSI AND DWOB. PICKUP AND RE-RIH TO 13324.5' PICKUP AND RE-RIH TO 13324.8' PICKUP AND RE-RIH TO 13326.0' • CONTINUE TO MILL OFF AT 5-10 FPH THRU 13327' INCREASE SPEED AS NEEDED TO MAINTAIN 200 PSI WORK. MILL/DRILL TO 13342'CTMD BEFORE PU TO ADJUST TOOLFACE. 14:35 - 17:15 2.67 STKOH N DPRB 14,001.00 PROD1 DRILLING AHEAD FROM 13,342-13,475' 1 FS=3550 PSI @ 1.49 BPM. ROP=40-90 FPH. .5-1.8K WOB. 100-400 PSI MOTOR WORK. 8.9/8.9 IN/OUT. ECD/IA/OA/PVT= 10.28/295 PSI/195 PSI/ 131 BBLS. TRUCKS WITH NEW MUD ON LOCATION. HELD SIMULATED FIRE DRILL AT THE SATELITE OFFICE. QUICK RESPONSE BY RIG CREW AT THE SCENE. 17:15 - 20:30 3.25 STKOH N DPRB 14,001.00 PROD1 WIPER TRIP FROM 13,474'TO 11,376' WITH-10K OVERPULLS TO 46K @ 11,890' AND 11,880' RIH,TIGHT @ 11,880', P/U AND DROP PUMP TO.5 BPM IRIH WITH NO TROUBLE @ 11,880'AND 11,890' INCREASE PUMP TO 1.4 BPM 3550 PSI. CONTINUE RIH 25 FPM TO BOTTOM PUMP MIN.RATE PASSING THROUGH BILLET @ 13324'. Printed 9/6/2011 9:09:15AM north America-ALASKA- BP Page 19 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 ' Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) 20:30 - 00:00 3.50 STKOH N rDPRB 14,001.00 PROD1 DRILLING AHEAD FROM 13,474' START MUD SWAP TO NEW 8.8 PPG POWER VIS MUD � FS=3650 PSI @ 1.5 BPM ROP 50-80 FPH. 1-1.9K WOB. 100-250 PSI MOTOR WORK. I NEW MUD AROUND FS=3400 PSI @ 1.5 BPM 1 8.8/8.82 IN/OUT. BHP=5511 PSI. ECD/IA/OA/PVT= 10.09/ PSI/267/190 PSI /129 BBLS. DRILL TO 13,675' MUD SWAP COMPLETE. 7/31/2011 100:00 - 03:10 3.17 STKOH N DPRB 14,001.00 1 PROD1 WIPER TRIP FROM 13,675'TO 11,376 AND I 1 BACK.' PUMP MIN.RATE THROUGH BILLET @ 13,325' RIH,TIGHT @ 11,890'P/U TO 11,800' REDUCE PUMP RATE TO.5 BPM AND WORK THROUGH SHALES TO 11,900' INCREASE PUMPS TO 1.4 BPM 3100 PSI, RIH. PASS THROUGH BILLET @ 13,325'PUMPING MIN.RATE. RECORD SPR ON 1 AND 2 MP. r 103:10 - 06:15 3.08 STKOH N DPRB , 14,001.00 PROD1 DRILLING AHEAD FROM 13,675'TO 13,850'MD ' i FS=3550 PSI @ 1.6 BPM ROP 75-100 FPH. 1-1.5K WOB. 100-200 PSI MOTOR WORK. I l 8.78/8.8 IN/OUT. BHP=5851 PSI. ECD/IA/0A/PVT= 10.17/289 PSI/219 PSI/ 129 BBLS. DRILLING TO 13,800' 06:15 10:15 4.00 STKOH N ' DPRB PROD1 'WIPER TRIP FROM 13,850'TO 11,000' - 14,000.97 1 PUMP MIN. RATE THROUGH BILLET @ 13,325' :CORRELATE TOOL+9'CORRECTION. OPEN EDC AND JET LINERTOP 1.8 BPM 3K I PSI . RIH TO 11,850 REDUCE PUMP RATE TO.5 BPM AND WORK ' !THROUGH SHALES TO 11,900' INCREASE PUMPS TO 1.4 BPM 3100 PSI, RIH 11 I 1 TO 13,850. PASS THROUGH BILLET @ 13,325'PUMPING MIN.RATE. 10:15 11:00 0.75 STKOH N DPRB 14,000.97 PROD1 DRILLING AHEAD FROM 13,850'TO 13,901' , FS=3700 PSI @ 1.6 BPM. ROP=65-75 FPH. .5-1.5K WOB. 100-250 PSI MOTOR WORK. 8.82/8.83 IN/OUT. ECD/IA/OA/PVT= 10.49/345 PSI/255 PSI/ 341 BBLS. , DRILL TO 13,901'BEFORE HAVING DIFFCULTY GETTING WEIGHT TO BIT. 11:00 12:45 1.75 STKOH ' N DPRB 114,000.97 PROD1 DRILLING FROM 13,901 TO 13,932' 1 CONTINUE HAVING TROUBLE GETTING WEIGHT TO BIT. TAKING SMALL BITES BY PU,TURN AROUND AND BACK TO BOTTOM FOR 2-4 FEET EACH TIME. 12:45 - 13:45 1.00 STKOH N DPRB 14,000.97 PROD1 WIPER TRIP FROM 13,932 TO 13,410'MD(BHA JUST ABOVE BILLET). 25 FPM,1.6 BPM,3700 PSI. ECD/IA/OA/PVT= 10.25/ 345 PSI/255 PSI/ 338 BBLS. BEGIN BRINGING LUBES FROM 4%TO MAX OF 5%. Printed 9/6/2011 9:09:15AM "nrth America -ALASKA- BP Page 20 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay i Site: PB DS 07 Rig Name/No.: NORDIC 2 I Spud Date/Time:4/23/1979 12:00:00AM Rig Release:8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) ;13:45 14:15 r 0.50 7 STKOH I. N DPRB 14,000.97 PROD1 BACK ON BOTTOM DRILLING AHEAD FROM 13,932'-13,942' 14:15 - 15:10 0.92 ' STKOH N DPRB 14,000.97 PROD1 PU OFF BOTTOM SLOWLY AND ALLOW LUBE ADDITION TO WORK DOWNHOLE AND AROUND BACKSIDE. 15:10 - 16:25 1.25 STKOH N DPRB 14,000.97 PROD1 RETURN TO BOTTOM AND DRILL AHEAD I FROM 13,942'TO 13,982' ' I FS=3700 PSI @ 1.6 BPM. ROP=80-120 FPH. i .5-1.5K WOB. 300-400 PSI MOTOR WORK. 8.85/8.84 IN/OUT. ECD/IA/OA/PVT= 10.32/370 PSI/292 PSI/ 337 BBLS. 16:25 - 21:15 4.83 STKOH N DPRB 14,000.00 PROD1 WIPER TRIP FROM 13,982'TO 11,000' PUMP MIN. RATE THROUGH BILLET @ 13,325' LOG TIE IN @ 11,398.8'+5'CORRECTION. OPEN EDC AND JET LINERTOP 1.9 BPM 3300 PSI. ' RIH TO 11,800' REDUCE PUMP RATE TO.5 BPM AND WORK THROUGH SHALES TO 11,900'-11,920' INCREASE PUMPS TO 1.2 BPM 2900 PSI, RIH TO 13,982. • PASSING THROUGH BILLET @ 13,325' -i PUMPING MIN.RATE. 21:15 - 23:00 1.75 STKOH I N ' DPRB 14,000.00 ! PROD1 DRILLING AHEAD FROM 13,982' FS=3650 PSI @ 1.51 BPM 1-1.5K WOB.50-100 PSI MOTOR WORK. I I 8.85/8.85 IN/OUT. BHP=5843 PSI. I ECD/IA/OA/PVT= 10.35/347 PSI/304 PSI/ 340 BBLS. CONTINUE HAVING TROUBLE GETTING WEIGHT TO BIT. TAKING SMALL BITES BY PU,TURN AROUND i AND I BACK TO BOTTOM FOR 1-2 FEET EACH TIME. i_ DRILLING TO 14001' 23:00 - 00:00 1 1.00 DRILL P PROD1 DRILLING FROM 14001' BACK TO OPERATIONAL DEPTH OF 14,001' NPT STOPS, RETURN TO PLANNED I OPERATIONS. CONTINUE HAVING TROUBLE I TRANSFERRING WEIGHT TO BIT. 1 SLOW PROGRESS WITH 2 FPH. DRILL TO 14,006' 8/1/2011 00:00 - 03:40 3.67 F DRILL P PROD1 DRILLING AHEAD FROM 14,006' FS=3300 PSI @ 1.34 BPM .5-1K WOB. 50-75 PSI MOTOR WORK. 8.85/8.85 IN/OUT. BHP=5843 PSI. ECD/IA/OA/PVT= 10.35/366 PSI/317 PSI/ 335 BBLS. CONTINUE HAVING TROUBLE GETTING WEIGHT TO BIT. P/U AND RUN BACK IN DRILLING SMALL BITES AT A TIME. DRILLING TO 14,016'. 03:40 - 05:30 1.83 DRILL N RREP 14,005.97 PROD1 PULSATION DAMPER ON#2 MP WEEPING FLUID AT N2 PORT ON TOP. SWITCH TO#1 MP. j I i i POH INTO WINDOW TO MAKE REPAIRS TO MP#2 PULSATION DAMPER. Printed 9/6/2011 9:09:15AM "nrth America -ALASKA- BP Page 21 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3-00YW1-C X3-00YW1-C(2,150,300.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs 1 Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 05:30 - 05:45 0.25 DRILL N RREP 14,005.97 PROD1 PJSM-LOTO#2 MP.C/O BURST DISC ON PULSATION DAMPER. RE-CHARGE WITH N2 REMOVE LOTO, OPEN EDC. PUMP @ 1.6 BPM 3100 PSI. FOR 5 MIN, NO LEAKS. l• CLOSE EDC. 05:45 - 07:30 1.75 DRILL 1 N RREP 14,005.97 PROD1 RIR TO 14,016 AT 25 FPM. WEIGHT SLACKED OFF AT 11900'BUT FELL THROUGH OKAY. REDUCE PUMPS TO 0.25 BPM WHILE PASSING BILLET 07:30 - 09:00 1.50 DRILL P PROD1 ATTEMPT TO DRILL AHEAD. MAKE 4 FEET OF NEW HOLE. 14,016-14,020'. 09:00 - 13:40 4.67 DRILL P PROD1 WIPER TRIP TO WINDOW WHILE AWAITING DECISION FROM ASSET. LOST 4 BBLS ON TRIP TO WINDOW. 300PSI MOTOR WORK WHILE BHA IN SHALE AT 11,900' 13:40 - 14:30 0.83 DRILL P PROD1 BYPASS HP PUMPING SCREENS I BEGIN SENDING 20 BBL STEEL LUBE SWEEP DOWN HOLE 1.75 BPM 3300 PSI. PUMPING THROUGH EDC. BEFORE STEEL LUBE AROUND CORNER: PU-34K,SO-16.4K, ECD-10.45PPG RECIPROCATING PIPE 100'AT 15-20 FPM BIT DEPTH AT 11,300 WHEN SWEEP EXITING EDC. AFTER STEEL LUBE AROUND CORNER: ' PU-34K,SO-17.0K,ECD-10.45PPG 14:30 - 14:45 0.25 DRILL P 1PROD1 CLOSE EDC. ORIENT TOOLFACE 70L TO I PASS WINDOW. 1 CORRELATE DEPTH- +7 14:45 - 16:25 1.67 DRILL P I PROD1 RIH FROM WINDOW TO TD @14,020'MD SO WEIGHT 14.5K(PRIOR TRIP,SO WEIGHT I I WAS 13K) FREE SPIN=3750 @ 1.45 BPM. TAKE SPR'S TAG UP 14,021'MD 16:25 - 19:50 3.42 DRILL P PROD1 DRILLING AHEAD FROM 14,021'-14,135'Cad I TD. FS=3750 PSI @ 1.47 BPM. ROP=–85 FPH. .5-1.9K WOB. 100-250 PSI MOTOR WORK. 8.86/8.78 IN/OUT. BHP=4843 PSI. ECD/IA/OA/PVT= 10.42/309 PSI/292 PSI/ 320 BBLS. 19:50 - 00:00 4.17 DRILL , P PROD1 WIPER TRIP FROM 14,135'TO 11,370' CLEAN WIPER TRIP. TIE IN LOG @ 11,375'+2.5'CORRECTION. RIH,MIX TORQLESS BEAD LINER RUNNING PILL. I START 40 BBL LINER PILL DOWNHOLE @ I 13,600' I TAG TD 2 TIMES TO CONFIRM @ 14,132' CORRECTED DEPTH. 8/2/2011 100:00 - 01:30 1.50 DRILL P PROD1 POH,LAYING IN 40 BBL LINER WIPER PILL. POH TO 11,300'. 01:30 - 01:40 0.17 1 DRILL P PROD1 OPEN EDC. l FLOWCHECK WELL-STATIC Printed 9/6/2011 9:09:15AM Horth America -ALASKA- BP Page 22 of 22 Operation Summary Report Common Well Name:07-13 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/18/2011 End Date: X3 OOYWI-C X3-00YW1-C(2,150,300.00) Project:Prudhoe Bay Site:PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: 8/10/2011 Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 01:40 - 04:00 2.33 DRILL P PROD1 POH PUMPING MAX RATE @ 1.9 BPM 3550 PSI. FLAG EOP @ 7832.1'FOR LINER @ 11,000' FLAG EOP @ 10,832.1'FOR LINER @ 14,000' TAG SURFACE. 04:00 - 04:30 0.50 DRILL P PROD1 PJSM FOR HANDLING BHA.CLOSE EDC. TEST AGITATOR.WORKING. 'FLOWCHECK WELL. ' PVT=258 BBLS.I/A=242 PSI, VA=299 PSI. 04:30 - 05:00 0.50 DRILL P PROD1 L/D BHA#10 BITGRADE2/1 /CT/NO/X/I/NO/TD. 05:00 - 06:00 1.00 EVAL P . PROD1 REMOVE QTS, PJSM, R/U AND CUT 50'CTB. OUT MICRO MOTION READING ERRATIC WITH PUMPS OFFWHEN AT SURFACE. READING FROM.45 BPM TO.69 BPM. RIG ELECTRICIAN TROUBLESHOOTING. Printed 9/6/2011 9:09:14AM North America -ALASKA- BP Page 1 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI.500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) • 8/2/2011 06:00 - 06:30 0.50 CASING P RUNPRD CREW CHANGE. DISCUSS RIG OPS AND EQUIPMENT. MAKE CHECKS AND ROUNDS. CONTINUE TO PREP E-COIL FOR LINER RUN. 06:30 - 10:00 3.50 CASING P RUNPRD INSTALL COIL CONNECTOR FOR RUNNING LINER. PULL AND PRESSURE TEST SAME. 10:00 - 14:00 4.00 CASING P RUNPRD DROP 3/4"BALL. UNABLE TO CIRCULATE IT WITH MUD. SWAP COIL TO WATER. BALL MOVING OK, CAN HEAR SAME. CONTINUE TO CHECK MICRO MOTION OUT SYSTEM. 14:00 - 15:00 1.00 CASING P RUNPRD FLOW CHECK MICRO MOTION WITH A SCHEDULE OF PUMP RATES. SYSTEM PERFORMING OK AND MATCHING MICRO IN RATE. 15:00 - 16:00 1.00 CASING P RUNPRD HOLD PJSM TO DISCUSS MU OF LINER, DISCUSS ASSIGNMENTS AND POSITIONS. 16:00 - 23:20 7.33 CASING P RUNPRD MU 2-3/8"SHOE TRACK. MU 97 JTS OF 2-3/8" SOLID LINER WITH CEMENTRALIZERS. TORQUE TO 500 FT LBLS. DRIFT EACH JOINT AFTER MAKE UP WITH 1 875"DRIFT. JT#62,#69,#70. DID NOT DRIFT. REPLACE WITH SAME LENGHT JTS. 2 REPLACEMENT JTS DID NOT DRIFT AFTER M/U. BACKUP ON POWER TONGS SLIPPING A LITTLE. ROTATE DIES.CHECK TORQUE VALUES. CONTINUE M/U REMAINING LINER- ALL DRIFTED AFTER M/U. M/U SELRT. ENSURE 5/8"BALL WILL PASS THROUGH QC AND CROSS OVERS. PUMP 7 BBLS WATER OUT OF COIL FROM PREVIOUS BALL DROP. — --- .------_----_------ - 23:20 - 00:00 0.67 CASING P RUNPRD M/U XO AND 4 JTS 2 1/16"CSH. M/U INJECTOR. 8/3/2011 00:00 - 01:00 1.00 CASING P RUNPRD WITH LINER MADE UP AND INJECTOR ON- ESTABLISH CIRCULATION. CLEAR RIG FLOOR PVT=217 BBLS,VA=114 PSL O/A=77 PSL 01:00 - 06:00 5.00 CASING N RUNPRD TROUBLESHOOT OUT MICRO MOTION. CALL OUT RIG ELECTRICIAN. WITHOUT PUMPING READS.23 BPM TO 8 BPM. MONITOR WELL. 06:00 - 06:30 0.50 CASING N RUNPRD CREW CHANGE. DISCUSS RIG STATUS AND OPS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS.CONTINUE TO TROUBLE SHOOT MICRO MOTION OUT. 06:30 - 11:00 4.50 CASING N RUNPRD TRUBLE SHOOT MICRO MOTION. REPLACE CABLING FROM MEASUREMENT UNIT TO CENTRAL PROCESSOR. TEST MM AT 0.5, 1.0, 1.5,2.0 BPM. GOOD MATCH WITH IN RATE. STOP PUMP AND MONITOR MM OUT WITH NO FLOW. APPEARS TO BE STABLE(WHICH IT WAS NOT BEFORE CABLE CHANGE). Printed 9/6/2011 9:09:38AM "'orth America -ALASKA- BP Page 2 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) i Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 13:00 2.00 !� CASING N r RUNPRD HOLD PJSM. GET OFF WELL. UNSTAB COIL. LD PHA6 AND LINER RUNNING TOOLS. 13:00 - 15:30 2.50 CASING N RUNPRD MAKE UP 3.88"OD FLUTTED NO GO ON LINER, WITH GS DEPLOYMENT SLEEVE.WIT I [: HCHECKS, HYDIS AND GS SPEAR. UNABLE I TO GET PAST LINER HANGER. DRESS OD OF NO-GO. � RIH OK ON 4 JTS PH6 WORK STRING. STAB COIL. GET ON WELL. 115:30 - 17:30 ! 2.00 CASING N RUNPRD RUN IN HOLE WITH LINER. MONITOR HOLE FILL,AND MM OUT. L WT CHECK AT 1900':7K#DN,16K#UP. 17:30 - 18:00 0.50 CASING N RUNPRD TAG SSSV PROFILE AT 2070'. 6K#DN,17K# UP WT. I CIRC AT 2.10 BPM AT 3750 PSI. PU AND FREE FROM LINER. T 18:00 - 18:30 0.50 j CASING N RUNPRD FLOWCHECK WELL. I CREW C/O. DISCUSS ONGOING OPS. CHECK EQUIPMENT. PJSM FOR L/D RUNNING TOOLS. 1 PVT=211 BBLS. I/A= 117 PSI.O/A=81 PSI. i 1- 18:00 - 18:00 0.00 CASING : N • RUNPRD CIRCULATE OUT OF HOLE. MONITOR HOLE FILL. 18:30 - 19:00 0.50 BOPSUR N RUNPRD SET BACK INJECTOR. L/D RUNNING TOOLS. 19:00 19:30 0.50 BOPSUB P { RUNPRD 1 ENSURE HOLE IS FULL. 1CLEAR RIG FLOOR. PJSM-REVIEW PROCEEDURE FOR 1INSPECTING BOP RAMS. i REVEIW SOP FOR BREAKING CONTAINMENT. R/U TO INSPECT BOP RAMS. 19:30 - 20:30 1.00 BOPSUB P RUNPRD CLOSE MASTER VALVE. INSTALL LUBRICATOR CAP. I PRESSURE TEST TO 250/3500 PSI FOR 5 MIN. • EACH. I CLOSE SWAB VALVE. j PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH. CHART RECORD EACH TEST. 20:30 - 22:00 1.50 BOPSUB P RUNPRD OPEN BOP DOORS. I PULL AND INSPECT ALL BOPE RAMS. C/O 2 3/8"COMBI RAM INSERTS AND TOP SEALS. 22:00 - 00:00 2.00 BOPSUB P RUNPRD JOHN CRISP WITH AOGCC WAIVED WITNESS FOR BOPE TEST. � I FILL STACK, KILL LINE, CHOKE MANIFOLD, GAS BUSTER U-TUBE WITH WATER. V PJSM-TEST BOPE. PERFORM BOP SHELL TEST TO 250 PSI FOR / A 5 MIN. `e,5 8/4/2011 I 00:00 - 06:00 I 6.00 BOPSUB P RUNPRD TEST BOPE. CONTINUE BOP SHELL TEST TO 3500 PSI FOR 5 MIN. TEST PIPE RAMS, HCR,3"MANUAL VALVE,2 KILL VALVES,CHOKE MANIFOLD, I [BLIND RAMS,2 FOSV TO 250/3500 PSI FOR 5 1 I MIN EACH. I TEST ANNULAR TO 250/2500 PSI FOR 5 MIN EACH. Printed 9/6/2011 9:09:38AM ^I"rth America -ALASKA- BP Page 3 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) [Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations _ hr 06:00 - 06:30 0.50 BOPSUB P ) RUNPRD CREW CHANGE DISCUSS RIG STATUS AND CURRENT OPS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TESTING BOPE. 06:30 - 10:00 3.50 BOPSUB P RUNPRD CONTINUE TO TEST BOPE. COMPLETE TEST WITH INNER REEL VALVE AND PACKOFFS. NO FAILURES. 10:00 - 11:30 1.50 CASING P RUNPRD My LINER RETRIEVAL BHA. INCLUDE GS SPEAR ON 4 JTS PH 6 PIPE. STAB COIL. GET ON WELL. ATTEMPT TO RI H. UNABLE TO GET MORE THAN 6'IN WELL. FIND A LARGE BURR ON COIL OD WHICH IS HANGIING UP IN PACKOFF BRASS. UNSTAB. GET OFF WELL. CUT COIL. MU AND TEST SLIP TYPE CONNECTOR. STAB COIL. GET ON WELL. 11:30 - 12:30 1.00 CASING P RUNPRD RUN IN HOLE. 5K#UP WT. LU"''' TAG AND LATCH FISH AT 2069'. UP WT 16K#'. 12:30 - 13:30 1.00 CASING P RUNPRD PULL OUT OF HOLE. CIRC ACROSS TOP AND HOLD 100 PSI ON WELL HEAD. MONITOR HOLE FILL DURING TRIP. 13:30 - 14:30 1.00 CASING P RUNPRD TAG UP. GET OFF WELL. UNSTAB COIL. • STAND BACK INJECTOR. LD PH6 PIPE. RELEASE FROM FISH. 14:30 - 15:30 1.00 CASING- P RUNPRD HOLD PJSM. MU SEBLRT TOOL. STAB COIL. GET ON WELL. • TEST LUBRICATOR UNION TO 300 AND 3500 PSI FOR 5 MIN. 15:30 - 20:30 5.00 CASING P RUNPRD RUN IN HOLE. CIRC 0.4 BPM AT 1575 PSI. WORK LINER THROUGH BILLET Cil 13,125'. RIH STACKING WT.AT 13,500' RECIPROCATE LINER 200' MAKING 20'-60'PROGRESS EACH TIME. P/U WT=38K, S/O WT=OK WORKING LINER TO 14,132'MD AT TD, TAG TD 2 TIMES. 20.30 - 21:30 1.00 CASING P RUNPRD P/U COIL 4' FOR BALL DROP POSITION. PUMP 10 BBLS KCL TO ASSIST BALL LAUNCH. PUMPING.37 BPM 2100 PSI. 21:30 - 00:00 2.50 CASING P RUNPRD LAUNCH 5/8"STEAL BALL 21:35 CONFIRM BALL ROLLING. SET DOWN TO 14.132 WITH LINER IN COMPRESSION- 10K OVER STRING WT. PUMP 1.55 BPM 3350 PSI. CONFIRM BALL OVER GOOSENECK. REDUCE PUMP RATE TO.4 BPM 1900 PSI. PUMP 40 BBLS. INCREASE RATE TO.6 BPM. 2200 PSI. PUMP 10 BBLS KCL FOLLOWED WITH 10 BBL HI VIS SWEEP- ATTEMPTING TO PUMP BALL ON SEAT. Printed 9/6/2011 9:09:38AM "'rrth America -ALASKA- BP Page 4 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth ' Phase Description of Operations 8/5/2011 00:00 - 00:35 0.58 CASING P ( > RUNPRD CONTINUE TO PUMP 5/8"BALL ON SEAT. i PUMPING.62 BPM 2100 PSI. P/U COIL TO NEUTRAL WT AND SLACK BACK DOWN- WITH 10 K COMPRESSION ON LINER. 'j CONTINUE PUMPING 10 BBLS KCL I FOLLOWED WITH 10 BBL HI V IS SWEEP CYCLE PUMPS. BALL ON SEAT AT 00:30. SHEAR AT 4150 PSI. P/U 4'ABOVE NEUTRAL WT 32.5K TO 14,155'- CONFIRM LINER RELEASE. ! STACK 10K ON LINER. 1 TOL=11,026.7', BOL=14,132' 00:35 - 06:00 5.42 CASING P RUNPRD DISPLACE WELL TO 8.6 PPG 2%KCL WITH .6%SAFELUBE. PUMPING 1.5 BPM 2490 PSI WHEN KCL ALL THE WAY AROUND. CLEAN PITS. LOAD REMAINING KCL FROM VAC TRUCK- SEND FOR 120 BBS KCL WITH 2 PPB BIO. • WITH KCL AROUND PUMPING 1.5 BPM 2090 PSI. • R/U CEMENTERS. CONTINUE CLEANING PITS. I LOAD REMAINING KCL FROM 2ND TRUCK INTO PITS. LOAD 120 BBL 2%KCL WITH 2 PPB BIO AND .6%SAFELUBE INTO PITS. 06:00 07:00 1.00 1 CASING P RUNPRD CONTINUE TO CIRCULATE HOLE WHILE TRANSFERRING FLUID FROM PITS. 1:1 RTNS DURING CIRCULATION. • 3075 PSI AT 1.70 BPM IN/OUT. 07:00 - 07:30 0.50 CASING P RUNPRD HOLD PJSM WITH SLB CEMENTERS, SLB AND NORDIC CREW. DISCUSS PLAN, HAZARDS, AND CONTIGENCIES. ALSO REVIEW JOB STEPS AND VOLUMES. Printed 9/6/2011 9:09:38AM "'with America -ALASKA- BP Page 5 of 11 Operation Summary Report Common Well Name: 07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) E Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 07:30 - 10:00 2.50 1 CASING I P RUNPRD PUMP 5 BBLS KCL. PRESS TEST LINES TO ,_ 6000 PSI. (�1" ' BATCH MIX CLASS G 15.8 PPG BLENDEDGA CMT. (5-25ML FL,4-5HRS THICKENING TIME) lei/‘ BATCHED UP AT 0815 HRS PUMP 13 BBLS CEMENT INTO COIL. ZERO MM IN AT 13.5 PPG. 3450 PSI AT 1.42 BPM IN. SHUT DN AND BLOW BACK TO CEMENTERS WITH BIOZAN. I DISPLACE COIL WITH RIG PUMPS USING BIOZAN/KCL. 1.2 BPM AT 3510 PSI @ 18 BBLS AWAY. 1.44 BPM@ 3029 PSI @ 23 BBLS AWAY. REDUCE RATE TO 1.0 BPM/1780 PSI @ 36 BBLS AWAY AS CMT NEARS SELRT. STOP CIRC AT 48.8 BBLS AWAY. PU TO UP WT+ 13'TO UNSTING FROM SELRT. PUMP 5 BBLS TO 53.8 BBLS TO EXHAUST 2 BBLS CMT AND 3 BBLS BIOZAN. TO 14142'. 1.27 BPM @ 1586 PSI WHILE ' I UNSTUNG. I OPEN BAKER CHOKE. RUN IN TO 14164' 1 WITH-2K#DN WT. CLOSE BAKER CHOKE. PRESS COIL TO 3250 PSI. SHEAR DART. } CIRC AT 1.4 BPM@ 3650 PSI. REDUCE RATE TO 0.9 TO REDUCE PRESSURE. 3505 PSI @ 0.81 BPM. CONTINUE 1:1 RTNS. REDUCE RATE TO 0.52 BPM@ 3005 PSI WITH I 1 66.3 BBLS PUMPED. PLUG BUMPES AT 66.8 BBLS. PRESSURE TO 3300 PSI. FLOATS BLEEDING OFFSLOWLY. OPEN BAKER CHOKE. NO RETURNS. PRESSURE COIL TO 500 PSI. PU OUT OF LINER. BREAK CIRC AS SOON AS UNSTUNG, AT 0.5 TO 1.0 FOR 4 BBLS. 960 PSI AT 0.45 BPMS. CIP@ 10:00 HRS. 10:00 - 13:00 3.00 CASING P RUNPRD I CIRCULATE OUT OF HOLE. MAINTAIN 0.5 BPM EXCESS RTNS. 1220 PSI @ ' 0.87 BPM. PVT:311 BBLS. HOLD BHA PJSM. FLOW CHECK AT SURFACE 13:00 - 14:00 1.00 CASING P RUNPRD rGET OFF WELL. UNSTAB COIL. LD PH6 PIPE. INSPECT SELRT RNG TOOL. 14:00 - 14:30 0.50 CONDHL P OTHCMP MU 3.8"MILL BHA WITH 2 JTS PH6 PIPE. STAB COIL. GET ON WELL. PT LUBRICATOR TO 300 AND 3500 PSI. 14:30 - 16:30 2.00 CONDHL P ' OTHCMP RUN IN HOLE. CIRC AT 2.63 BPM AT 3050 PSI. 16:30 - 17:00 0.50 CONDHL P OTHCMP PUMP 10 BBL HI VIS SWEEP. TAG TOL AT 11,055'(UNCORRECTED) !WASH LINER TOP AREA AS PILL EXITS COIL. 17:00 - 19:00 2.00 CONDHL P OTHCMP CIRCULATE OUT OF HOLE. 2.67 BPM @ 3105 PSI. PVT:336 BBLS. CREW C/O-DISCUSS OPS,CHECK EQUIPMENT. TAG UP AT SURFACE. 19:00 - 19:15 0.25 CONDHL P OTHCMP I FLOWCHECK WELL. 1 I PJSM-TO UD BHA. PVT=281 BBLS. Printed 9/6/2011 9:09:38AM "'rrth America -ALASKA- BP Page 6 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA •UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) 19:15 - 20:45 1.50 CONDHL P OTHCMP SET BACK INJECTOR. UD 3.80"CLEANOUT BHA. CLEAR RIG FLOOR. CONDUCT AAR-UD TOOLS WENT WELL 20:45 - 00:00 3.25 CONDHL P OTHCMP PJSM-FOR M/U BHA AND HANDLING 1"CSH. M/U 1.75"CLEANOUT BHA. M/U 1.75"MILL,1"X-TREME MOTOR,CIRC SUB,HYD DISC,XO, SWAP FOR 1"CSH. RUN 52 STDS 1"CSH,CIRCULATE EVERY 15 SIDS- TO ENSURE MUD MOTOR STAYS CLEAR. 8/6/2011 00:00 - 02:00 2.00 CONDHL P ' OTHCMP RUN 52 STDS 1"CSH,CIRCULATE EVERY 15 STDS- TO ENSURE MUD MOTOR STAYS CLEAR. M/U HI-LOAD DISC, DFV,XO,2 JTS 2 1/16" PH6, XO, BAKER QC,CTC M/U INJECTOR- TEST QTS TO 250/3500 PSI FOR 5 MIN EACH. PVT=279 BBLS VA=161 PSI, O/A=118 PSI. UCA TEST RESULTS= 500 PSI COMPRESSIVE STRENGTH IN 5 HRS 45 MIN. 02:00 - 05:45 3.75 CONDHL P OTHCMP RIH.PUMPING.33 BPM 690 PSI. BEFORE ENTERING TOL INCREASE RATE TO .9 BPM 2900 PSI. RIH 30 FPM. NO MOTOR WORK. TAG PBTD @ 14,160'UNCORRECTED DEPTH. 05:45 - 06:00 0.25 CONDHL P OTHCMP POH. - CREW CHANGE. DISCUSS RIG OPS AND 06:00 06:30 0.50 CONDHL P OTHCMP 'STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO PULL OUT OF HOLE. 06:30 - 09:45 3.25 CONDHL P OTHCMP POOH WITH 1.75"CLEAN OUT BHA. HOLD BHA PJSM. 09:45 - 12:00 j 2.25 CONDHL P ( OTHCMP AT SURFACE GET OFF WELL UNSTAB COIL. STAND BACK 1"CSH PIPE. REARRANGE PIPE IN DERRICK DUE TO CONFLICT WITH 1.25"CSH. 12:00 - 13:30 1.50 CONDHL P OTHCMP MU SWIZZLE BHA. JET OUT BOPS TO CLEAR POSSIBLE CEMENT BUILD UP. 13:30 - 16:30 3.00 CONDHL P OTHCMP DRESS HANDLING TOOLS. RUN IN HOLE WITH 1.25"CSH. 16:30 - 20:45 4.25 CONDHL P OTHCMP CREW C/O-DISCUSS RIG OPS,CHECK EQUIPMENT. PJSM FOR L/D CSH. PULL OUT OF HOLE WITH CSH. LD IN SINGLES. REMOVE FROM PIPE SHED. 20:45 - 21:45 1.00 CONDHL P OTHCMP CLEAN RIG FLOOR. C/O EQUIPMENT TO RUN LOGGING TOOLS AND 1"CSH. HELD MR FOR UD 1 114"CSH.EVERYTHING WENT WELL 21:45 - 22:40 0.92 EVAL P OTHCMP 1PJSM FOR HANDLING AND P/U LOGGING BHA. REVIEW SOP FOR HANDLING SOURCE. LOAD LOGGING TOOLS ONTO RIG FLOOR. Printed 9/6/2011 9:09:38AM "firth America-ALASKA- BP Page 7 of 11 Operation Summary Report Common Well Name: 07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/25/2011 End Date: X3-00YW1-C(971,139.00) I I Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:40 - 00:00 1.33 EVAL P OTHCMP M/U MEMORY GR/CCUCNL LOGGING TOOLS. PORTED SUB,1/2"CIRC SUB, HYD. DISC,XO, 104JTS 1"CSH. RIH WITH 1"CSH. 8/7/2011 00:00 - 02:15 2.25 EVAL P ' OTHCMP RIH WITH 52 STDS 1"CSH-FILL PIPE @STD# 26. M/U XO, 3/4"DISC, DBPV,XO,2 JTS 2 1/16" PH6,XO,QC, CTC. M/U INJECTOR-PT QTS TO 250/3500 PSI 5 MIN EACH. 02:15 - 02:40 0.42 EVAL P OTHCMP FILL PIPE,BREAK CIRCULATION. R/U ENCODER FOR MEMORY TOOLS. 02:40 - 04:10 1.50 EVAL P OTHCMP RIH WITH SLB LOGGING BHA.. PUMPING.4 BPM 580 PSI 04:10 - 06:00 1.83 EVAL P OTHCMP LOG DOWN FROM 10,650'AT 30 FPM. PUMPING.4 BPM 700 PSI. 12,600'-START 37 BBL KCL 8.6 PPG 120 LSRV 4PERF PILL DOWN HOLE. 06:00 - 06:30 0.50 EVAL P OTHCMP CREW CHANGE. DISCUSS RIG STATUS AND CURRENT OPS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE LOGGING WITH MCNUGR. 06:30 - 07:45 1.25 EVAL P OTHCMP.TAG PBTD AT 14159'. LOG UP HOLE AT 60 FPM. LAY IN HI-VIS PERF PILL WITH 2%LO-TORQUE. FLAG EOP AT 10,457'. 07:45 - 09:15 1.50 EVAL P OTHCMP CIRCULATE OUT OF HOLE. 2889 PSI AT 1.42 BPM. DISPLACE WELL TO CLEAN KCL. HOLD BHA PJSM. 09:15 - 12:00 2.75 EVAL P OTHCMP AT SURFACE. FLOW CHECK. GET OFF WELL. UNSTAB COIL. SET BACK INJECTOR. STAND BACK 1"CSH IN DERRICK(52 STANDS). REMOVE SOURCE. LD LOGGING TOOLS. _ DOWN LOAD AND PROCESS LOG DATA. 12:00 - 13:30 1.50 EVAL P OTHCMP PRESSURE TEST TBG TO EVALUATE LINER LAP. SHUT IN WELL. PRESSURE UP WELL AND CHART SAME. 12:37 320 PSI 12:42 310 12:44 2618 12:49 2128 BUMP BACK UP 12:50 2500 12:55 2110 13:00 1937 13:05 1805 13:10 1705 13:15 1625 13:20 1534 TEST DOES NOT PASS CRT-AK-10-45 BLEED OFF REMAINING PRESSURE. 13:30 - 14:30 1.00 PERFOB P OTHCMP HOLD PJSM TO RU FOR PERF JOB. LOAD GUNS IN TO PIPE SHED. 14:30 - 16:00 1.50 PERFOB P OTHCMP PROCESS LOG DATA TO DETERMINE PBTD TO FINALIZE BTM GUN LENGTH. CLEAN PITS AND CENTRIFUGE. RELEASE VAC TRUCKS. Printed 9/6/2011 9:09:38AM "-,rth America -ALASKA- BP Page 8 of 11 Operation Summary Report Common Well Name: 07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/25/2011 End Date: X3-OOYWI-C(971,139.00) Project:Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 PERFOB P OTHCMP HOLD PJSM TO DISCUSS PERF GUN BHA HANDLING PROCEDURE. 16:30 - 18:00 1.50 PERFOB P OTHCMP MU 23 GUNS 1.56"6 SPF 1606PJ. 18:00 - 18:30 0.50 PERFOB P OTHCMP CREW C/O, DISCUSS OPS.CHECK EQUIPMENT. PJSM FOR HANDLING GUNS AND FIRING HEAD- REVIEW SOP FOR RUNNING PERF GUNS- REVIEW PROCEEDURE FOR RUNNING 1" CSH. NEW CREW RETURNED- MAKE SURE ALL OPERATIONS ARE UNDERSTOOD.. 18:30 - 22:00 3.50 PERFOB P OTHCMP P/U REMAINING PERF GUNS. M/U FIRING HEAD,5/8"DISC,XO. RUN 43 STDS 1"CSH. M/U XO,3/4"DISC,DBPV,XO,2 JTS 2 1/16" CSH,XO,QC. M/U INJECTOR,TEST QTS TO 250/3500 PSI 5 MIN EACH. PVT=358 BBLS.I/A=144 PSI.O/A=88 PSI. 22:00 - 00:00 2.00 PERFOB P , OTHCMP RIH.WITH 1.56"PERF GUN BHA. PUMPING.33 BPM 350 PSI. 8/8/2011 - ZONISO P RUNPRD 00.00 - 01:00 1.00 PERFOB P OTHCMP RIH WITH 1.56"CTB PERF GUN BHA. PUMPING.34 BPM 400 PSI. CONFIRM EOP FLAG DEPTH @ 10,457.3' UNCORRECTED. P/U WT=39K.S/0 WT= 17K TAG PBTD @ 14,150'UNCORRECTED. PVT=397 BBLS. 01:00 - 02:00 1.00 PERFOB P OTHCMP P/U AND TAG PBTD AGAIN TO CONFIRM. DISCUSS FIRING SEQUECE. j I Ij RESET PBTD TO CORRECTED DEPTH @ 14,118' P/U TO 14,112.7' 02:00 - 02:30 0.50 PERFOB P OTHCMP PRACTICE FIRING SEQUENCE. RUN THROUGH FIRING SEQUENCE BY CYCLING PRESSUE ON BACKSIDE. POH SLOWLY, FIRE GUNS ON DEPTH @ 14,111' GOOD INDICATION GUNS FIRED. L i BOTTOM SHOT @ 14 110 3'. TOP SHOT(c_D 13,9 Z11_ 02:30 - 02:50 0.33 PERFOB P OTHCMP PUH TO NEXT FIRING DEPTH @ 13,510' 02:50 - 03:40 0.83 PERFOB P OTHCMP PRACTICE FIRING SEQUENCE. RUN THROUGH FIRING SEQUENCE BY CYCLING PRESSUE ON CTB. POH SLOWLY, FIRE GUNS ON DEPTH @ 13,508.1' GOOD INDICATION GUNS FIRED, HOLE TOOK 4 BBLS. BOTTOM SHOT @ 13,350' TOP SHOT @ 13,000' 03:40 - 04:25 0.75 PERFOB P OTHCMP POH WITH PERF GUNS TO 11,000' '04:25 - 04:35 0.17 PERFOB P OTHCMP FLOWCHECK WELL ABOVE TOL. 04:35 - 06:00 1.42 PERFOB P OTHCMP POH 95 FPM. PUMPING.85 BPM 1650 PSI. Printed 9/6/2011 9:09:38AM "'.rth America -ALASKA- BP Page 9 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12 00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA l UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth' Phase Description of Operations (hr) (ft) 06:00 - 06:30 0.50 PERFOB P OTHCMP CREW CHANGE. DISCUSS RIG OPS AND STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO PULL OUT OF HOLE WITH CSH. 06:30 - 11:00 4.50 ' PERFOB P OTHCMP PULL AND STAND BACK CSH IN DERRICK. PJSM WITH SLB CREW TO DISCUSS HANDLING GUNS. PULL AND LD 26 PERF GUNS. ALL GUN SHOTS FIRED. REMOVE GUNS FROM RIG. 11:00 - 13:30 2.50 PERFOB P ' OTHCMP RUN IN HOLE WITH 1"CSH PIPE. 13:30 - 16:30 3.00 PERFOB P OTHCMP PULL OUT OF HOLE WITH CSH PIPE. LD IN SINGLES. (125 jts) HOLE REMAINING STATIC. 16:30 - 18:00 1.50 ZONISO P , RUNPRD BRING PACKER AND OTHER JEWELRY INTO ' PIPE SHED. PJSM. P/U 4.5"KB LTP ASSY. M/U 42-30 SEAL ASSY,LOC,2-7/8 PUP,1 JT 2 7/8 STL, 45 KB PKR,4"GS RT. 18:00 - 19:40 1.67 ZONISO P RUNPRD CREW C/O,DISCUSS RIG OPS.CHECK I EQUIPMENT. . CONTINUE M/U LTP BHA. XO,2 JTS 2 1/16 CSH,X/O, QC, CTC. PJSM-M/U INJECTOR. PT ON QTS FAILED-P/U INJECTOR, 0/0 0-RINGS AT CONNECTION. ' I TEST QTS TO 250/3500 PSI. PVT=337,VA=129 PSI,O/A=51 PSI. 19.40 - 21:55 2.25 ZONISO _P RUNPRD RIH WITH 4 1/2"LTP BHA. 95 FPM. 'PUMPING.3 BPM 100 PSI. RIH TO 10,950', P/U=35K S/O= 17K TAG TOL p 11057'UNCORRECTED DEPTH. I PVT=374 BBLS. Printed 9/6/2011 9:09:38AM m rth America-ALASKA- BP Page 10 of 11 Operation Summary Report Common Well Name:07-13 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.: NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:55 - 23:50 1.92 ZONISO P RUNPRD STING IN FROM 11,057'TO 11,066.6' STACKING 7K. P/U TO BREAKOVER STRING WT TO 11,057' TO CONFIRM STUNG IN. STING BACK IN TO 11,067'STACKING 7K. P/U TO BALL DROP POSITION @ 11,030' LAUNCH 5/8"STEEL BALL WITH 850 PSI. PUMPING 2.1 BPM 1655 PSI. BALL WAS HEARD LEAVING REELHOUSE @ 9 BBLS AWAY. PUMP 25 BBLS-REDUCE PUMP TO.5 BPM 120 PSI. SET PUMP TRIP TO 400 PSI. PUMP BALL ON SEAT. OPEN BAKER CHOKE.BLEED OFF COIL PRESSURE. RIH,STING BACK IN STACKING 10K. P/U TO BREAKOVER+ 1 FT TO 11,056' CLOSE CHOKE, PRESSURE UP COIL TO 1800 PSI. OPEN CHOKE,STING IN,STACK 10K.. P/U TO NEUTRAL WT. LINE UP KILL LINE, PRESSURE UP ON BACKSIDE TO- 300 PSI FOR 5 MIN.GOOD TEST. PRESSURE UP TO 2400 PSI FQB 30 MIN . GOOD TEST. HIGH TEST LOST 10 PSI IN 30 MIN. CONTACT WTL-AUTHORIZATION TO PROCEED. 23:50 - 00:00 0.17 ZONISO P RUNPRD STING IN STACKING 5K. SET PUMP TRIP TO 4500 PSI. PRESSURE UP AND SHEAR @ 3400 PSI. UNSTING TOP PACKER SET Coil 10.975.8', BOTTOM OF SEALS @ 11,028' NO-GO @ 11,022' 8/9/2011 00:00 - 02:20 2.33 ZONISO P RUNPRD POH WITH 45 KB PACKER RUNNING TOOLS. PUMPING.86 BPM 355 PSI. TAG @ SURFACE. 02:20 - 02:30 0.17 ZONISO P RUNPRD FLOWCHECK WELL-STATIC. 02:30 - 03:10 0.67 ZONISO P RUNPRD PJSM-SET BACK INJECTOR. L/D LTP RUNNING TOOLS. LOAD OUT TOOLS. RECOVERED 5/8"BALL. 03:10 - 03:40 0.50 BOPSUR P POST M/U NOZZLE. M/U INJECTOR. PRESSURE TEST QTS TO 250/3500 PSI 5 MIN. EACH. 03:40 - 04:20 0.67 BOPSUR P POST RIH TO 2500' PJSM WITH LR PUMPING SERVICES. R/U LINES. PRESSURE TEST LINES TO 250/4500 PSI. 04:20 - 05:10 0.83 BOPSUR P POST RIH TO 2500' LR PRESSURE TEST LINES TO 4500 PSI. FREEZE PROTECT WELL WITH DIESEL PUMPING 2BPM 2100 PSI. 05:10 - 06:00 0.83 BOPSUR P POST POH-TAG UP. CLOSE SWAB AND MASTER VALVES. Printed 9/6/2011 9:09:38AM "'^rth America -ALASKA- BP Page 11 of 11 Operation Summary Report Common Well Name: 07-13 AFE No Event Type: COM-ONSHORE(CON) Start Date: 7/25/2011 End Date: X3-00YW1-C(971,139.00) Project: Prudhoe Bay Site: PB DS 07 Rig Name/No.:NORDIC 2 Spud Date/Time:4/23/1979 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292033800 Active Datum:23: 14 5/17/1979 00:00 @64.00ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 06:30 0.50 RIGD P POST CREW CHANGE. DISCUSS RIG OPS AND STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO PREP FOR N2 BLOW DOWN. 06:30 - 09:00 2.50 RIGD P POST HOLD PJSM WITH SLB N2 CREW. PUMP COIL CORROSION TREATMENT AND 40 BBLS. CHASE WITH 5 BBLS 60/40 AND N2. BLEED DOWN COIL AND WELLHEAD. 09:00 - 12:30 3.50 BOPSUR P POST THOLD PJSM WITH BPV CREW. BRING TOOLS AND LUBRIATOR ON TO RIG. RU AND PT LUBRICATOR TO 300 AND 3500 1 PSI. CHART SAME. SET BPV. SECURE WELL. RD DSM TOOLS. REMOVE FROM RIG. 12:30 - 16:30 4.00 RIGD P POST RU TO UNSTAB COIL. SECURE GRAPPLE. PULL.BACK TO REEL. SECURE COIL TO I 1 REEL. LOWER REEL ON TO TRANSPORT TRAILER. SECURE REEL CLOSE DOOR. SECURE T-BAR WITH DRIVE PLATES. 16:30 - 00:00 7.50 RIGD P F POST CONTINUE TO CLEAN PITS. 8/10/2011 00:00 - 05:00 5.00 RIGD P POST PJSM.N/D BOPF CONTINUING TO CLEAN PITS AND AROUND CENTRIFUGE. 05:00 - 06:00 1.00 RIGD P POST INSTALL TREE CAP.SECURE CELLAR AREA. 06:00 - 06:30 0.50 1 RIGD P ' POST CREW CHANGE. DISCUSS RIG STATUS AND OPS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. 06.30 - 12:30 6.00 RIGD P POST CONTINUE TO CLEAN PITS. P - E CAP • I. •ND 3500 PSI. BLED 50 PSI BACK THROUGH TREE. NO VISIBLE LEAKS ON TREE EXTERIOR. CONTINUE TO CLEAN PITS. MOVE EXTERNAL EQUIPMENT AWAY FROM RIG. CONTINUE TO HAUL LOADS TO PAD 10 LOCATION. FINISH SPOTTING MATS ON PAD ACCESS ROAD. 12.30 - 13:00 0.50 RIGD P POST HOLD PJSM WITH RIG CREW TO DISCUSS BACKING OFF WELL. DISCUSS HAND LOCATION ON GROUND,AGREE ON HAND SIGNAL FOR STOPPING RIG. ALSO DISCUSS NEED FOR BACK UP COMMUNICATION IN CASE OF RADIO FAILURE:LINE OF SIGHT HAND SIGNALS. NEED FOR DRILLER TO STOP RIG IF LINE OF SIGHT IS LOST. i RELEASE RIG AT 1300 HRS. Printed 9/6/2011 9:09:38AM BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 07 07-13 - Slot 13 500292033800 07-13C Survey: MWD Survey Report - Geographic 04 August, 2011 ram BAKER 0 HUGHES Survey Report-Geographic bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling Well: 07-13 North Reference: True Wellbore: 07-13C Survey Calculation Method: Minimum Curvature Design: 07-13C Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 07,TR-11-14 Site Position: Northing: 5,948,144.78ft Latitude: 70°15'49.847 N From: Map Easting: 677,382.28ft Longitude: 148°33'56.934 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.35 ° Well 07-13 API No 500292033800 Well Position +N/-S 0.00 ft Northing: 5,950,290.00 ft Latitude: 70°16'11.283 N +E/-W 0.00 ft Easting: 675,896.86 ft Longitude: 148°34'38.694 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore 07-13C API No 500292033803 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) 11 (nT) BGGM2011 7/15/2011 21.52 80.99 57,666 Design 07-13C Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,301.26 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (1 -27.00 0.00 0.00 297.36 Survey Program Date: 8/3/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 88.26 9,988.26 1 :Gyrodata gyrocompassing m/(07-13) GYD-GC-MS Gyrodata gyrocompassing m/s 10,008.00 11,319.50 MWD(07-13A) MWD MWD-Standard 11,350.70 13,301.26 MWD(07-13CPB1) MWD MWD-Standard 13,324.20 14,132.00 MWD(07-13C) MWD MWD-Standard 8/4/2011 10:00:02AM Page 2 COMPASS 2003.16 Build 73 1Pi b BAKER 0 p NYONIS Survey Report-Geographic 1 NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling Well: 07-13 North Reference: True Wellbore: 07-13C Survey Calculation Method: Minimum Curvature Design: 07-13C Database: EDM.16-ANC Prod-WH24P Survey Measured TVD Below Map Map Depth Inclination Azimuth System +N/-S +E/_W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 13,301.26 91.17 208.04 8,960.55 3,328.20 -5,076.17 5,953,498.45 670,744.63 70°16'43.999 N 148°37'6.528 W TIP 13,324.20 91.37 207.41 8,960.04 3,307.90 -5,086.84 5,953,477.91 670,734.43 70°16'43.799 N 148°37'6.838 W KOP 13,353.89 95.80 211.49 8,958.19 3,282.11 -5,101.40 5,953,451.78 670,720.48 70°16'43.546 N 148°37'7.262 W 13,387.50 94.40 216.19 8,955.20 3,254.31 -5,120.04 5,953,423.56 670,702.50 70°16'43.272 N 148°37'7.804 W 13,414.96 92.12 219.21 8,953.64 3,232.62 -5,136.80 5,953,401.49 670,686.25 70°16'43.059 N 148°37'8.292 W 13,444.50 92.91 224.32 8,952.34 3,210.62 -5,156.45 5,953,379.03 670,667.12 70°16'42.842 N 148°37'8.863 W 13,475.47 89.79 227.69 8,951.61 3,189.12 -5,178.72 5,953,357.02 670,645.36 70°16'42.631 N 148°37'9.511 W 13,504.47 87.30 230.51 8,952.35 3,170.14 -5,200.63 5,953,337.54 670,623.90 70°16'42.444 N 148°37'10.149 W 13,534.51 89.14 235.60 8,953.28 3,152.10 -5,224.62 5,953,318.94 670,600.35 70°16'42.266 N 148°37'10.847 W 13,564.47 86.41 233.93 8,954.44 3,134.83 -5,249.07 5,953,301.11 670,576.31 70°16'42.096 N 148°37 11.559 W 13,594.40 86.87 229.79 8,956.20 3,116.38 -5,272.56 5,953,282.12 670,553.25 70°16'41.915 N 148°37 12.243 W 13,624.60 89.02 226.08 8,957.28 3,096.17 -5,294.96 5,953,261.38 670,531.33 70°16'41.716 N 148°37'12.895 W 13,654.00 88.93 221.15 8,957.81 3,074.89 -5,315.23 5,953,239.64 670,511.57 70°16'41.506 N 148°37 13.485 W 13,685.41 89.42 213.22 8,958.26 3,049.89 -5,334.20 5,953,214.21 670,493.19 70°16'41.260 N 148°37'14.036 W 13,714.31 89.32 207.42 8,958.58 3,024.96 -5,348.78 5,953,188.94 670,479.20 70°16'41.015 N 148°37'14.461 W 13,745.31 90.12 201.11 8,958.73 2,996.71 -5,361.51 5,953,160.40 670,467.13 70°16'40.737 N 148°37'14.831 W 13,774.15 90.83 194.94 8,958.49 2,969.30 -5,370.43 5,953,132.79 670,458.85 70°16'40.467 N 148°37'15.090 W 13,806.00 91.35 188.01 8,957.88 2,938.11 -5,376.76 5,953,101.47 670,453.25 70°16'40.161 N 148°37'15.274 W 13,834.43 90.25 184.89 8,957.49 2,909.87 -5,379.96 5,953,073.16 670,450.72 70°16'39.883 N 148°37'15.366 W 13,864.55 90.58 181.72 8,957.27 2,879.80 -5,381.69 5,953,043.06 670,449.69 70°16'39.587 N 148°37'15.416 W 13,893.61 91.69 187.14 8,956.69 2,850.85 -5,383.94 5,953,014.07 670,448.12 70°16'39.302 N 148°37'15.481 W 13,924.32 90.92 190.14 8,955.99 2,820.50 -5,388.55 5,952,983.62 670,444.22 70°16'39.004 N 148°37'15.614 W 13,955.10 93.44 193.63 8,954.82 2,790.40 -5,394.88 5,952,953.39 670,438.59 70°16'38.708 N 148°37'15.798 W 13,995.44 94.08 198.85 8,952.17 2,751.77 -5,406.13 5,952,914.51 670,428.25 70°16'38.328 N 148°37'16.125 W 14,027.39 93.68 202.75 8,950.01 2,721.98 -5,417.45 5,952,884.46 670,417.63 70°16'38.035 N 148°37'16.454 W 14,055.15 92.76 207.16 8,948.45 2,696.86 -5,429.14 5,952,859.07 670,406.53 70°16'37.787 N 148°37'16.794 W 14,084.23 92.95 212.19 8,947.00 2,671.63 -5,443.52 5,952,833.52 670,392.75 70°16'37.539 N 148°37'17.212 W 14,091.97 92.42 213.15 8,946.64 2,665.12 -5,447.69 5,952,826.91 670,388.73 70°16'37.475 N 148°37'17.333 W 14,132.00 92.42 213.15 8,944.95 2,631.64 -5,469.56 5,952,792.93 670,367.65 70°16'37.146 N 148°37'17.970 W TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 10,005.00 7,787.96 9 5/8" 9.625 12.250 Survey Annotations Measured Vertical Local Coordinates Depth Depth +W-S +E/-W (ft) (ft) (ft) (ft) Comment 13,301.26 8,960.55 3,328.20 -5,076.17 TIP 13,324.20 8,960.04 3,307.90 -5,086.84 KOP 14,132.00 8,944.95 2,631.64 -5,469.56 TD Checked By: Approved By: Date: 8/4/2011 10:00:02AM Page 3 COMPASS 2003.16 Build 73 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 07 07-13 - Slot 13 500292033800 07-13CPB1 Survey: MWD Survey Report - Geographic 04 August, 2011 `10004, Rill s,►K.R bp0 NYdNE: Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling Well: 07-13 North Reference: True Wellbore: 07-13CPB1 Survey Calculation Method: Minimum Curvature Design: 07-13CPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 07,TR-11-14 Site Position: Northing: 5,948,144.78ft Latitude: 70°15'49.847 N From: Map Easting: 677,382.28ft Longitude: 148°33'56.934 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.35 ° Well 07-13 API No 500292033800 Well Position +N/-S 0.00 ft Northing: 5,950,290.00 ft Latitude: 70°16'11.283 N +EI-W 0.00 ft Easting: 675,896.86 ft Longitude: 148°34'38.694 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore 07-13CPB1 API No 500292033870 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 11 11 (nT) BGGM2009 12/31/2010 21.93 80.93 57,711 Design 07-13CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,319.50 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) Ift) l") -27.00 0.00 0.00 296.90 Survey Program Date: 7/29/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 88.26 9,988.26 1 :Gyrodata gyrocompassing m/(07-13) GYD-GC-MS Gyrodata gyrocompassing m/s 10,008.00 11,319.50 MWD(07-13A) MWD MWD-Standard 11,350.70 14,001.00 MWD(07-13CPB1) MWD MWD-Standard 8/4/2011 9:53:36AM Page 2 COMPASS 2003.16 Build 73 "I' b R NI/BAONES Survey Report-Geographic p INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling Well: 07-13 North Reference: True Wellbore: 07-13CPB1 Survey Calculation Method: Minimum Curvature Design: 07-13CPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured TVD Below Map Map Depth Inclination Azimuth System +NI-S +E/-W Northing Easting (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,319.50 46.43 353.69 8,807.49 4,439.20 -3,863.08 5,954,637.42 671,931.34 70°16'54.933 N 148°36'31.215 W 11,350.70 55.44 1.33 8,827.15 4,463.35 -3,864.03 5,954,661.54 671,929.83 70°16'55.170 N 148°36'31.243 W KOP 11,351.00 55.53 1.40 8,827.32 4,463.60 -3,864.03 5,954,661.79 671,929.83 70°16'55.173 N 148°36'31.243 W 11,382.79 59.86 352.00 8,844.33 4,490.36 -3,865.62 5,954,688.51 671,927.61 70°16'55.436 N 148°36'31.290 W 11,410.99 61.19 341.00 8,858.24 4,514.18 -3,871.36 5,954,712.18 671,921.32 70°16'55.670 N 148°36'31.457 W 11,440.57 64.89 330.00 8,871.68 4,538.10 -3,882.30 5,954,735.84 671,909.82 70°16'55.905 N 148°36'31.777 W 11,470.59 67.43 318.49 8,883.84 4,560.31 -3,898.33 5,954,757.67 671,893.28 70°16'56.124 N 148°36'32.244 W 11,499.78 71.32 307.76 8,894.15 4,578.93 -3,918.25 5,954,775.81 671,872.93 70°16'56.307 N 148°36'32.824 W 11,531.84 72.56 296.51 8,904.12 4,595.10 -3,944.02 5,954,791.38 671,846.79 70°16'56.466 N 148°36'33.575 W 11,560.16 76.56 286.21 8,911.68 4,605.00 -3,969.41 5,954,800.68 671,821.18 70°16'56.563 N 148°36'34.315 W 11,590.73 77.54 274.80 8,918.55 4,610.42 -3,998.65 5,954,805.42 671,791.82 70°16'56.616 N 148°36'35.167 W 11,620.93 80.00 262.94 8,924.45 4,609.82 -4,028.20 5,954,804.13 671,762.29 70°16'56.610 N 148°36'36.028 W 11,650.97 83.61 251.22 8,928.74 4,603.17 -4,057.12 5,954,796.81 671,733.53 70°16'56.545 N 148°36'36.870 W 11,680.94 86.41 239.54 8,931.36 4,590.75 -4,084.21 5,954,783.76 671,706.75 70°16'56.422 N 148°36'37.659 W 11,710.51 88.19 227.97 8,932.76 4,573.32 -4,107.99 5,954,765.77 671,683.38 70°16'56.251 N 148°36'38.351 W 11,740.57 87.76 226.53 8,933.82 4,552.93 -4,130.05 5,954,744.87 671,661.81 70°16'56.050 N 148°36'38.993 W 11,770.61 86.84 229.82 8,935.24 4,532.92 -4,152.41 5,954,724.35 671,639.92 70°16'55.853 N 148°36'39.644 W 11,802.62 86.93 232.58 8,936.98 4,512.89 -4,177.31 5,954,703.75 671,615.49 70°16'55.656 N 148°36'40.369 W 11,832.34 86.84 234.37 8,938.59 4,495.23 -4,201.16 5,954,685.53 671,592.07 70°16'55.482 N 148°36'41.064 W 11,860.16 87.09 233.14 8,940.06 4,478.81 -4,223.57 5,954,668.59 671,570.05 70°16'55.320 N 148°36'41.716 W 11,890.25 87.15 230.98 8,941.58 4,460.33 -4,247.27 5,954,649.57 671,546.80 70°16'55.139 N 148°36'42.406 W 11,920.17 86.44 229.61 8,943.25 4,441.25 -4,270.25 5,954,629.95 671,524.27 70°16'54.951 N 148°36'43.075 W 11,950.19 85.67 228.03 8,945.31 4,421.53 -4,292.79 5,954,609.72 671,502.19 70°16'54.757 N 148°36'43.731 W 11,980.20 85.82 226.03 8,947.54 4,401.13 -4,314.68 5,954,588.81 671,480.78 70°16'54.556 N 148°36'44.369 W 12,010.42 86.93 225.25 8,949.45 4,380.04 -4,336.25 5,954,567.23 671,459.72 70°16'54.349 N 148°36'44.996 W 12,040.56 86.78 224.32 8,951.10 4,358.68 -4,357.45 5,954,545.38 671,439.03 70°16'54.138 N 148°36'45.614 W 12,069.74 86.96 223.94 8,952.70 4,337.77 -4,377.73 5,954,524.00 671,419.23 70°16'53.933 N 148°36'46.204 W 12,100.37 86.90 223.24 8,954.34 4,315.62 -4,398.82 5,954,501.36 671,398.67 70°16'53.715 N 148°36'46.818 W 12,130.45 88.96 222.16 8,955.43 4,293.53 -4,419.21 5,954,478.81 671,378.81 70°16'53.497 N 148°36'47.411 W 12,160.37 89.72 221.41 8,955.77 4,271.22 -4,439.14 5,954,456.04 671,359.40 70°16'53.278 N 148°36'47.992 W 12,190.34 90.18 220.87 8,955.80 4,248.65 -4,458.86 5,954,433.02 671,340.22 70°16'53.056 N 148°36'48.566 W 12,220.66 91.66 220.06 8,955.31 4,225.59 -4,478.53 5,954,409.50 671,321.09 70°16'52.829 N 148°36'49.138 W' 12,250.77 92.61 219.08 8,954.19 4,202.39 -4,497.70 5,954,385.87 671,302.47 70°16'52.600 N 148°36'49.696 W 12,280.31 92.94 218.60 8,952.76 4,179.41 -4,516.20 5,954,362.46 671,284.51 70°16'52.374 N 148°36'50.235 W 12,310.20 92.67 218.21 8,951.29 4,156.02 -4,534.75 5,954,338.64 671,266.52 70°16'52.144 N 148°36'50.774 W 12,342.82 93.50 217.35 8,949.54 4,130.27 -4,554.71 5,954,312.44 671,247.17 70°16'51.891 N 148°36'51.355 W 12,370.20 92.64 217.06 8,948.07 4,108.50 -4,571.24 5,954,290.28 671,231.15 70°16'51.676 N 148°36'51.836 W 12,400.36 90.46 215.75 8,947.26 4,084.23 -4,589.13 5,954,265.61 671,213.84 70°16'51.438 N 148°36'52.357 W 12,430.59 90.40 215.68 8,947.03 4,059.69 -4,606.78 5,954,240.66 671,196.77 70°16'51.196 N 148°36'52.870 W 12,460.87 90.00 215.50 8,946.92 4,035.07 -4,624.40 5,954,215.63 671,179.73 70°16'50.954 N 148°36'53.383 W 12,490.69 90.28 216.15 8,946.85 4,010.89 -4,641.85 5,954,191.06 671,162.85 70°16'50.716 N 148°36'53.891 W 12,520.40 89.69 217.33 8,946.86 3,987.08 -4,659.62 5,954,166.84 671,145.64 70°16'50.482 N 148°36'54.408 W 12,550.58 89.14 217.54 8,947.17 3,963.12 -4,677.97 5,954,142.46 671,127.86 70°16'50.246 N 148°36'54.942 W 12,580.76 89.33 217.07 8,947.57 3,939.11 -4,696.26 5,954,118.04 671,110.14 70°16'50.010 N 148°36'55.474 W 12,610.51 89.23 216.19 8,947.94 3,915.24 -4,714.00 5,954,093.76 671,092.95 70°16'49.775 N 148°36'55.991 W 12,640.53 88.99 215.31 8,948.41 3,890.88 -4,731.54 5,954,068.99 671,075.99 70°16'49.535 N 148°36'56.501 W 12,671.69 89.02 214.87 8,948.95 3,865.39 -4,749.45 5,954,043.09 671,058.68 70°16'49.284 N 148°36'57.022 W 12,700.49 88.86 214.06 8,949.48 3,841.65 -4,765.75 5,954,018.98 671,042.95 70°16'49.051 N 148°36'57.497 W 12,730.60 88.25 213.06 8,950.24 3,816.56 -4,782.39 5,953,993.52 671,026.90 70°16'48.804 N 148°36'57.981 W 12,760.86 88.77 212.83 8,951.03 3,791.18 -4,798.84 5,953,967.75 671,011.05 70°16'48.554 N 148°36'58.459 W 12,791.10 88.37 212.34 8,951.79 3,765.71 -4,815.12 5,953,941.91 670,995.37 70°16'48.304 N 148°36'58.933 W 12,821.09 88.68 212.45 8,952.56 3,740.39 -4,831.18 5,953,916.23 670,979.90 70°16'48.055 N 148°36'59.400 W 12,850.75 88.28 213.79 8,953.34 3,715.56 -4,847.38 5,953,891.03 670,964.29 70°16'47.810 N 148°36'59.872 W 12,881.15 88.53 216.62 8,954.19 3,690.73 -4,864.90 5,953,865.80 670,947.36 70°16'47.566 N 148°37'0.382 W 8/4/2011 9:53:36AM Page 3 COMPASS 2003.16 Build 73 Rim b BAKER 0 HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00©52.26ft(generic drilling Well: 07-13 North Reference: True Wellbore: 07-13CPB1 Survey Calculation Method: Minimum Curvature Design: 07-13CPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured ND Below Map Map Depth Inclination Azimuth System +N/-5 +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,913.42 89.51 213.88 8,954.74 3,664.39 -4,883.52 5,953,839.03 670,929.36 70°16'47.307 N 148°37'0.923 W 12,940.92 88.74 213.36 8,955.16 3,641.49 -4,898.74 5,953,815.78 670,914.68 70°16'47.081 N 148°37'1.366 W 12,971.00 87.85 212.28 8,956.06 3,616.22 -4,915.04 5,953,790.14 670,898.98 70°16'46.833 N 148°37'1.840 W 13,000.12 87.54 211.52 8,957.23 3,591.52 -4,930.41 5,953,765.09 670,884.18 70°16'46.590 N 148°37'2.288 W 13,030.67 87.67 210.48 8,958.51 3,565.36 -4,946.13 5,953,738.57 670,869.08 70°16'46.332 N 148°37'2.745 W 13,060.69 87.39 209.20 8,959.80 3,539.34 -4,961.06 5,953,712.21 670,854.77 70°16'46.076 N 148°37'3.179 W 13,091.39 88.04 209.06 8,961.02 3,512.55 -4,975.99 5,953,685.08 670,840.47 70°16'45.813 N 148°37'3.614 W 13,122.64 87.58 208.82 8,962.22 3,485.22 -4,991.10 5,953,657.41 670,826.00 70°16'45.544 N 148°37'4.053 W 13,150.42 89.91 209.22 8,962.83 3,460.94 -5,004.57 5,953,632.81 670,813.10 70°16'45.305 N 148°37 4.445 W 13,180.06 90.58 209.00 8,962.70 3,435.04 -5,018.99 5,953,606.59 670,799.29 70°16'45.050 N 148°37'4.864 W 13,210.45 90.98 208.09 8,962.28 3,408.35 -5,033.51 5,953,579.57 670,785.40 70°16'44.788 N 148°37 5.287 W 13,241.81 90.86 207.99 8,961.78 3,380.67 -5,048.25 5,953,551.56 670,771.31 70°16'44.515 N 148°37'5.716 W 13,270.79 91.35 208.02 8,961.22 3,355.09 -5,061.86 5,953,525.67 670,758.31 70°16'44.264 N 148°37'6.111 W 13,301.26 91.17 208.04 8,960.55 3,328.20 -5,076.17 5,953,498.45 670,744.63 70°16'43.999 N 148°37'6.528 W 13,332.92 91.44 207.17 8,959.83 3,300.15 -5,090.84 5,953,470.07 670,730.62 70°16'43.723 N 148°37'6.954 W 13,360.56 92.15 205.92 8,958.97 3,275.44 -5,103.18 5,953,445.08 670,718.86 70°16'43.480 N 148°37'7.313 W 13,390.99 90.61 204.77 8,958.23 3,247.95 -5,116.21 5,953,417.29 670,706.48 70°16'43.210 N 148°37'7.692 W 13,421.55 87.42 201.62 8,958.76 3,219.87 -5,128.24 5,953,388.94 670,695.11 70°16'42.933 N 148°37'8.042 W 13,453.21 89.72 200.03 8,959.55 3,190.29 -5,139.49 5,953,359.11 670,684.55 70°16'42.642 N 148°37'8.369 W 13,483.20 88.71 199.48 8,959.96 3,162.07 -5,149.62 5,953,330.66 670,675.08 70°16'42.365 N 148°37'8.664 W 13,513.75 87.24 198.70 8,961.04 3,133.22 -5,159.61 5,953,301.58 670,665.77 70°16'42.081 N 148°37'8.954 W 13,545.03 86.62 198.73 8,962.71 3,103.63 -5,169.63 5,953,271.78 670,656.45 70°16'41.790 N 148°37'9.245 W 13,575.50 86.53 203.29 8,964.54 3,075.25 -5,180.53 5,953,243.14 670,646.21 70°16'41.511 N 148°37'9.562 W 13,604.08 84.38 206.08 8,966.80 3,049.36 -5,192.43 5,953,216.99 670,634.92 70°16'41.256 N 148°37'9.908 W 13,634.30 85.64 211.63 8,969.43 3,023.01 -5,206.95 5,953,190.31 670,621.02 70°16'40.997 N 148°37'10.330 W 13,664.16 86.22 216.72 8,971.55 2,998.37 -5,223.68 5,953,165.29 670,604.88 70°16'40.754 N 148°37'10.817 W 13,696.75 86.62 224.13 8,973.59 2,973.63 -5,244.75 5,953,140.06 670,584.39 70°16'40.511 N 148°37'11.430 W 13,724.13 90.49 228.20 8,974.28 2,954.68 -5,264.49 5,953,120.66 670,565.10 70°16'40.324 N 148°37'12.005 W 13,755.11 92.73 233.75 8,973.41 2,935.19 -5,288.54 5,953,100.61 670,541.52 70°16'40.132 N 148°37'12.704 W 13,784.44 92.76 238.88 8,972.00 2,918.95 -5,312.91 5,953,083.81 670,517.53 70°16'39.973 N 148°37'13.414 W 13,818.50 91.56 235.63 8,970.72 2,900.54 -5,341.53 5,953,064.74 670,489.35 70°16'39.791 N 148°37'14.247 W 13,844.76 94.26 232.65 8,969.39 2,885.18 -5,362.78 5,953,048.88 670,468.47 70°16'39.640 N 148°37'14.865 W 13,875.05 94.15 228.54 8,967.16 2,866.01 -5,386.12 5,953,029.17 670,445.59 70°16'39.451 N 148°37'15.545 W 13,904.97 90.74 227.15 8,965.89 2,845.95 -5,408.27 5,953,008.60 670,423.91 70°16'39.254 N 148°37'16.189 W 13,934.81 90.71 220.28 8,965.51 2,824.40 -5,428.88 5,952,986.58 670,403.81 70°16'39.042 N 148°37'16.789 W 14,001.00 90.71 220.28 8,964.69 2,773.91 -5,471.67 5,952,935.10 670,362.21 70°16'38.545 N 148°37'18.034 W TD 8/4/2011 9:53:36AM Page 4 COMPASS 2003.16 Build 73 TREE= GRAY GEN 2 SAFETY NOT' WELL ANGLE>70 @ 11501'***4-1/21" WELLHEAD= GRAY CHOME PJC DRAFT 07-1 3C MILRLED TOB 3`80 "(05/020/02 ND OORIGINAL, A'"@AN 11282 ACTUATOR= AXELSON KB.ELEV= 64' I WELLBORES NOT SHOWN*** BF.ELEV= 27.5' KOP= 2190' 20"CONDUCTOR, 108' ( ® 2059' —4-1/2"CA TRDP-4A SSSV NIP, ID=3.812" Max Angle=96°@ 13354' 94#,H-40, LOCKED OUT(05/20/02) Datum MD= 11309' ID=19.124" �� 2313' —17-5/8"CPH LNR TOP PKR,ID=6.875" Datum TVD= 8800'SS 9-5/8"CSG,47#, SOO-95 XO TO L-80 BTC — 2327' 2349' 9-5/8"UPPER FOC 7-5/8"SCAB LNR,29.7# 2473' 19-5/8"LOWER FOC 5 8 H 2516 L-80 STL, ID=6.875" 2510' 17-5/8"HY-FLOW ED HGR/PKR, ID=6.75" IGAS LIFT MANDRELS 13-3/8"CSG,72#, L-80 BTC, ID=12.347" H 2760' ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"X 7"BKR TYPE"H"PKR,HMC HGR 1 9796' I1 4487 4088 46 KBMG DMY RK 0 01/28/11 &TIE-BACK SLV,ID=6.188" 2 7665 6146 51 KBMG DMY BK-5 0 01/28/11 3 9719 7613 36 KBMG DMY BK-5 0 07/12/02 9-5/8"MILLOUT WINDOW(07-13A) 10005'-10055' 9-5/8"CSG,47#,L-80 BTC,ID=-8.681" — —10005 I--- Minimum ID = 1.78" @ 11030' 1 1TH 10983' CTD MD 14-1/2"OTIS X NIP, ID=3.813" MILLED OUT BUSHING IN 3" DEPLOY SLV Las. .2y 10983' —BKR 45 KB PKR, ID=2.370" 4-1/2"TBG, 12.6#,L-80 NSCT --I 10994' I x XO TO 13CR-80 NSCT 11003' —5-3/4"BKR PBR/SEAL ASSY, ID=3.875"BEHIND LNR 11029' 1 3.70"DEPLOY SLV w/LOC SEAL ASSY, ID=2.360" 11 11030' -13"BKR DEPLOY SLV,ID=1.780" 11034' —7"X 4-1/2"BKR S-3 PKR, ID=3.83 N' \ 11085' —3-1/2"BKR DEPLOY SLV, ID=3.00" BEHIND 11094' —3-1/2"HES XN NIP,ID=2.75" CT LNR W I 11096' --13-1/2"X 3-3/16"XO,ID=2.786" x L\ PRODUCTION MANDRELS A k ST MD TVD DEV TYPE VLV LATCH PORT DATE H >0 k 4-1/2"TBG, 12.6#,13CR-80 NSCT — 11287' ) '')4 4 11173 8751 41 KBG-2-LS *EMPTY BK-5 - 06/16/02 5 11199 8775 41 KBG-2-LS *EMPTY BK-5 - 04/28/95 .0152 bpf, ID=3.958" *MANDRELS MILLED TO 3.80"(06/25/02)/BEHIND 3-3/16"LNR 3-3/16"WHIPSTOCK(07/21/11) — 11350' '1 11265'J—BKR KBH-22 ANCHOR BEHIND 3-3/16"LNR,6.2#,L-80 TC11,.0076 bpf,ID=2.80" H —11351 / Y k ` w/7"X 4-1/2"BKR S-3 PKR,ID=3.83" CT LNR } k 7"LNR,294,L-80 NSCC,0371 bpf,ID=6.059" — —11356 > ; 11282' —4-1/2"CAMCO DB NIP,MILLED TO 3.80"(06/25/02) 11287' —4-1/2"WLEG, ID=3.958" PERFORATION SUMMARY REF LOG: SWS MEM CNL/GR/CCL ON 08/06!11 3-3/16"MILLOUT WINDOW(07-1 BA) 11351'- 11356" ANGLE AT TOP PERF:88°© 13000' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 1.56" 6 1300- 13070 0 08/08/11 1.56" 6 13220- 13350 0 08/08/11 1.56" 6 13980- 14110 0 08/08/11 PBTD — 14123' 2-3/8"LNR,4.6#,L-80 STL,.0039 bpf,ID=1.995" — 14132' c ,-)3c- DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/16/79 ROWAN 34ORIGINAL COMPLETION WELL: 07-13C 09/27/94 N2ES SIDETRACK(07-13A) PERMIT No:'2110540 07/09/02 NORDIC 1 CTD SIDETRACK(07-13B) API No: 50-029-20338-03 08/10/11 NORDIC 2 CTD SIDETRACK(07-13C) SEC 33,T11 N, R14E,299'FEL&630'FNL 08/14/11 PJC DRLG HO CORRECTIONS 08/20/11 PJC DRLG DRAFT CORRECTIONS . BP Exploration (Alaska) sia11. [E IF tiusEA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMIrIISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 07-13C BP Exploration (Alaska), Inc. Permit No: 211-054 Surface Location: 628' FNL, 290' FEL, SEC. 33, T11N, R14E, UM Bottomhole Location: 3171' FNL, 465' FEL, SEC. 29, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. S. cer:` 40/ .0 ,,(:, . . o : one DATED this *day of April, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) ALM' STATE OF ALASKA RECEIVED" ��ED ALOIL AND GAS CONSERVATION COMM ON �� ���� ,i-4 PERMIT TO DRILL 20 AAC 25.005 (�,,{{ 4�A�i� (; t1 1 a.Type of work: lb.Proposed Well Class: 83k4C:'''S c if viMli'iSpi6�5 A ®Development Oil 0Service-Winj 0Single Zone ❑ Drill Z Redrill 0 Stratigraphic Test ❑Development Gas 0 Service-Supply 0 Multiple Zone 0 Coale Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number. BP Exploration(Alaska)Inc. Bond No. 6194193 PBU 07-13C- 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O.Box 196612,Anchorage,Alaska 99519-6612 MD 14153' TVD 8975'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: 0 11 ADL 028309&028310 ') 628'FNL,290'FEL,SEC.33,T11N,R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3854'FSL,4143'FEL, SEC.28,T11N, R14E, UM June 10,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 3171'FNL,465'FEL,SEC.29,T11N,R14E, UM 2560 28150' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 104.52 feet 15.Distance to Nearest Well Open Surface: x- 675897 y-5950290 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 650' 16.Deviated Wells: Kickoff Depth: 11400 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3247 Surface: 2367 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD _ TVD MD TVD (including stage data) _ 3" 2-3/8" 4.6# L-80 STL 3143' 11010', 8628' ,141 141N' 8975'ss 56 sx 15.8 boa Class'G' V 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 12960' 8975' 12065' 12928' 8979' None Casing Length Size Cement Volume MD TVD Conductor/Structural 108' 20" 243 sx Arcticset 108' 108' Surface 2760' 13-3/8" 5600 sx Arcticset II 2760' 2728' Intermediate 10005' 9-5/8" ,1400 sx Class'G' 10005' 7840' Production Liner 204' 7-5/8" (Scab Liner) 2312'-2516' 2309'-2504' Liner 1568' 7" 500 sx Class'G' 9796'-11364' 7675'-8887' Liner 1875' 3-3/16"x 2-7/8" 98 sx Class'G' 11085'-12960' 8685'-8975' Perforation Depth MD(ft): 11675'-12051' Perforation Depth ND(ft): 8992'-8997' Below CIBP: 12100'-12925' Below CIBP:8997'-8979' 20.Attachments: 0 Property Plat IN BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program IN 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Jacob Leemhuis,564-4989 d Printed Name <• n ;,- Title Engineering Team Leader Prepared By Name/Number. Signature/ , 7 Phone 564-4711 Date G,.� '/ /( Elizabeth Barker,564-5674 7 Commission Use Only / Permit T• Drill API Number. Permit cp ovai Ip4t � See cover letter for Number a/Q,S* 50-029-20338-03-00 L-1 i`/.11 other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coal methane,gas hydrates,or gas contained shales: [r Other. 4' 35 ) psi. /30f S f Samples Req'd: ❑Yes Id No Mud Log Req'd: ❑Yes eo *z sex) Eck.: A y / r s F H2 Sxlldeasures: EYes 0 No a i .ctional Survey Req'd: I 'Yes 0 No 4110X �L / WI APPROVED BY THE COMMISSIONDate T 4""f ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 fr I(20 AAC 25.''5(g)) Submit I D plicate 11 � 41.44/.41 i' 11 To: Alaska Oil & Gas Conservation Commission From: Jacob Leemhuis 0 0 b CTD Engineer Date: April 4, 2011 Re: 07-13C Permit to Drill request Approval is requested for a permit to drill a CTD sidetrack from well 07-13B. Well 07-13B is a horizontal coil sidetrack drilled in June 2002 targeting Zone 1B sands. HOT was not tagged but is believed to be 5-10' below the well. There was 640' of Zone 1B initially perforated. Within 3 months, the oil rate fell and the GOR reached marginal GOR. A Borax/MCNUSTP was run in Jan 2003 to identify the gas source. The borax pass showed no channels, and the liner lap was not leaking. The well continued to cycle for the next 4 years with degrading ontime. A CIBP was set at 12065' CTMD on 3/13/07 for a GSO. An additional 85' of Zone 1B perforations were added in April 2009, but the well reached MGOR within 2 months. Based on the 2003 GOC and the very short rate buzz from the 2009 additional perforations, uphole lenses were not pursued. In January, 2011, a caliper was run. The tubing is in good-to-fair condition with a max well penetration of 36%. The liner is also in good condition. The MIT-IA passed to 3,000 psi and MIT-OA passed to 2,000 psi. The proposed plan for 07-13C is to drill a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig on or around June 10,2011. The existing perforations will be isolated by a packer whipstock, as well as the primary cement job. The sidetrack, 07-13C, will exit the existing 2-3/8" liner and kick off in the Ivishak and land in Zone 2A. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. CTD Sidetrack Summary Pre-Rig Work: (scheduled to begin April 21, 2011) 1. 0 MIT-IA to 3000 psi; MIT-OA to 2000 psi. 2. C Dummy Baker 3-3/16" PackerWS drift 3. W Test: PPPOT-T. Torque LDS 4. V PT MV, SV, WV 5. 0 Blind and bleed lines, remove well house, level pad 6. F Load & Kill well. Freeze protect to 2,000' TVD. 7. V Set BPV—24 hrs prior to rig arrival Rig Work: (scheduled to be on June 10, 2011) f Sa L �� 1. MIRU and test BOPE to 250 psi low and 3500 psi hight< 2. Mill 2.74" window at 11,390' and 10' of rathole. Swap the well to QuickDrill. (01`1•3 Q-l13? 3. Drill Build: 3" OH, 400' (35 deg/100 planned) 4. Drill Lateral: 3" OH, 2,382' (4 deg/100 planned) with resistivity 5. Run 2-3/8 solid liner leaving TOL at 11,010' i 4 s Fri) 6. Pump primary cement leaving TOC at 11,010', 11.5 bbls of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNUGR/CCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions (-600') 10. Freeze protect well, RDMO Post-Rig Work: 1. Re-install well house and attach production lines 2. Pull BPV 3. Run generic GLV as needed 4. Test separator (-600' of perforations) Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg QuickDrill for milling window and drilling. V Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: 2,782' MD of 3" hole Casing Program: • 2-3/8" STL, 4.6 pounds per foot, L-80 solid liner- 11,010' MD to 14,153' MD. • A minimum of 11.5 bbls 15.8 poq cement will be used for liner cementing. • TOC planned at 11,010' MD. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. . Directional • See attached directional plan. Maximum planned hole angle is 90°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property-28,150 ft. • Distance to nearest well within pool -650 ft Logging • MWD directional, Gamma Ray and resistivity will be run over all of the open hole section. • Cased hole GR/CCUMCNL logs will be run. Anti-Collision Failures • B-07-588.55 ft. ctr-ctr, Currently producing • 07-37 -27.75 ft ctr-ctr, Currently producing Hazards • No planned crossings of faults. • There are no wells on DS7 with H2S > 100 ppm - Reservoir Pressure • The reservoir pressure on 07-13C is expected to be 3,247 psi at 8,800' TVDSS. (7.1 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,367 psi. Jacob Leemhuis CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble -REE= tAY GEN 2 TES: S AND /2"NIPPLE@ NCTUA OR= AXELSON 07-1 3 B 1128 OED TO PROD. T18G. TRDP 4A B.ELEV= 52.3' SSSV LOCKED OUT. 3F. ELEV= 27.5' COP= 2190' 2059' H4-1/2"CAMCO TRDP-4A SSSV NIP, ID=3.812" ulax Angle= '@ 12897' TOP OF 7-5/8"LNR —I 2312' patum MD= 11309' X O 2312' H7-5/8"CPH LNR PKR, ID=6.875" 3atum TVD= 8800'SS 7-5/8"LNR-SCAB,47#,L-80, — 2516' R u 2516' H 7-5/8"HY-FLO 3D HGR/PKR,ID=6.75" .0459 bpf, ID=6.875" 13-3/8"CSG,72#,L-80,ID=12.347" I 2760' , 11 GAS LIFT MANDRELS - ST MD ND DEV TYPE VLV LATCH PORT DATE 1 4487 4088 46 KBMG-M DMY BK 0 01/28/11 TOP OF 7"LNR H 9796' 2 7665 6146 51 KBMG-M DMY BK 0 01/28/11 a 3 9719 7613 36 KBMG-M DMY BK-5 0 TOP OF CEMENT —I 9798' 1, y PRODUCTION MANDRELS .i 4ST MD ND DEV TYPE VLV LATCH FORT DATE 9-5/8"CSG,47#,L-80, ID=8.681" H 10005' 1 11 14 ,4 '4 11173 8752 41 KBMG-M EMPTY BEK-3 06/16/02 1' 1 '5 11199 8772 41 KBMG-M EMPTY BEK-3 04/28/95 ;�' 1 *MANDRELS MILLED TO 3.80"(06125102) (BEHIND 3-3116"LNR) 111 11 1�1�1� EZSV H 10210' 10983' —I 4-1/2"OTIS X NIP, ID=3.813" II fA 11034' —7"X 4-1/2"BAKER SA BL-3 PKR,ID=3.83" Minimum ID = 2.440" @ 11405' I '� ,�1f 11085' —3-1/2"BKR DEPLOY SLV, ID=3.000" 3-3/16" X 2-7/8" XO i ♦•1� to, 1111 eo 11094' — 3-1/2"HES XN NIP,ID=2.75" �'11 x1111 11096' — 3-1/2"X 3-3/16"XO,ID=2.880" 4 %vet 11111 t$A., 11216' H 4-1/2"BLAST RINGS(38.83') MIL LOUT WINDOW 11364'-11371' `'�1�1m m•�1;1� 11267' 7"X 4-1/2"BAKER SA BL-3 PKR, 11 �I� ID=3.83" 1'16 �� � Sii 11282' —4-1/2"CAMCO DB NIP,ID=3.80" 4-1/2"TBG, 12.6#,13-CR-80, .0152 bpf,ID=3.958" — 11287' (MILLED TO 3.80"06/25/02) 11287' —1 4-1/2"WLEG 7"X 4-1/2"WHIPSTOCK —{ 11360' 1140.5' I—3-3/16"X 2-7/8"X0,ID=2.440" PERFOFf3YiDIfa'SLARARt#,L-80, .0076 bpf,ID=2.80" —{ 11405' REF LOG:SWS MEMORY CNUGR/CCL 07/07/02 12065' CT M2-7/8"BKR CIBP ANGLEAT TOP PERF. 82 @ 11675' ` SET(03/13/07) Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 11675- 11695 0 04/15/09 04" %',A i 2" 6 11810-11875 0 04/14/09 1�411��'4 *4, / ♦��144 `� 04 2" 4 11947-12051 0 07/08/02 1'1����'1��1� 2" 4 12100- 12230 C 07/08/02 4'���4��'�1•4�4• 1�. 2" 4 12255- 12371 C 07/08/02 11'1144'14 12928' H PBTD 2" 4 12610- 12695 C 07/08/02 14 14 2" 4 12750- 12805 C 07/08/02 2" 4 12875- 12925 C 07/08/02 2-7/8"LNR,6.16#,L-80, .0055 bpf,ID=2.441" H 12960' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/13179 ORIGINAL COMPLETION 04/13/07 CJN/PAG GLV C/O WELL: 07-13B 09/27194 SIDETRACK(07-13A) 04/16/07 RDW/TLH WAIVER SFTY NOTE DELETED PERMIT No:t721160 07109/02 DAV/KK CTD SIDETRACK(07-13B) 05/31/09 ACB/TLH PERFS(04/15/09) API No: 50-029-20338-02 11/06/02 ADK/TP PERF CORRECTION 02/13/11 JLJ/AGR GLV C/O(01/28/11) SEC 33,T11N,R14E,4651'FEL&290'FNL 05/30/06 DTM WELLHEAD CORRECTIONS 03/13/07 CJA/PAG SET CIBP @ 12065'CTMD BP Exploration (Alaska) IV ES= !AY 07-13C NELLHEAD= GRAY SAF DTES: PROD.MANDRELS AND 4-1/2"NIPPLE @ kCTUATOR= AXELSON 1128k ,.,ILLEDTO3.80". 4-1/2"CHROME TBG. TRDP-4A CB ELEV= 52.3' Proposed C TD S ilei ack sssv LocKED our. 3 .ELEV= 27.5' COP= 2190' _ Vox = 12897' 2059' H4-1/2"CA MCO TRDP-4A SSSV NIP, ID=3.812" -Angle '@ _ TOP OF 7-5/8" LNR — 2312' Tatum ND 11309' - Z ) 2312' H7-5/8"CPH LNR PKR,ID=6.875" Tatum TVD= 8800'SS I2516' H7-5/7-5/8"LNR-SCAB,47#, L-80, — 2516' R 1.18"HY-FLO 3D HGR/PKR, ID=6.75" 0459 bpf, ID=6.875" 13-3/8"CSG,72#. L-80,ID=12.347" 2760' I ® GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 'yl 1 4487 4088 46 KBMG-M DMY BK 0 01/28/11 2 7665 6146 51 KBMG-M DMY BK 0 01/28/11 TOP OF 7" LNR H 9796' 11 3 9719 7613 36 KBMG-M DMY BK-5 0 III TOP OF CEMENT — 9798' V y PRODUCTION MANDRELS 14 7I ST MD WD DEV TYPE VLV LATCH PORT DATE 9-5/8"CSG,47#,L-80,ID=8.681" H 10005' 141 NI *4 11173 8752 41 KBMG-M EMPTY BEK-3 06/16/02 tai �. *5 11199 8772 41 KBMG-M EMPTY BEK-3 04/28/95 4t 1 *MANDRELS MILLED TO 3.80"(06/25/02)(BEHIND 3-3/16"LNR) T S G R 10.693' +�14 ♦• /44 EZ S V —I 10210' 10983' H 4-1/2"OTIS X NIP, ID=3.813" Minimum ID = 2.440" @ 11405' ' 11034' —7"X 4-1/2"BAKER SABL-3 PKR, ID=3.83" 3-3/16" X 2-7/8" XO 4 I, ••► 11085' —3-1/2"BKR DEPLOY SLV, ID=3.000" TO L —11,010' tv �41 TOC —11,010' /1� ,,t1/�� 11094' — 3-1/2"HES XN NIP,ID=2.75" A� \00 ���'., 11096' — 3-1/2"X 3-3/16"XO, ID=2.880" �11' . m����� 11216' —I 4-1/2"BLAST RINGS(38.83') MILLOUT WINDOW 11364'-11371' �'''\m •��;.4 11267' 7"X 4-1/2"BAKER SABL-3 PKR 1.. ; ID=3.83" .♦ V ' 11282' —4-1/2"CAMCO DB NIP,ID=3.80" 4-1/2"TBG 12.6#,13-CR-80, .0152 b• ID= • 8" �. (MILLED TO 3.80"06/25/02) H -3/16 whipstock @ 11,390' .________ 1128T 4-1/2"WLEG 7"X 4-1/2"WHIPSTOCK 1 .. PERFORAZIDI6'SLAIX1,610l, L-80, 0076. bpf, ID=2.80" —I 11405' TO —14,153' REF LOG:SWS MEMORY CNUGR/CCL 07/07/02 ANGLE AT TOP PERF: 82 @ 11675' 2-3/8" 4.7# L-80 liner 60 degszclatwtidow Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE Zone 2 ext , 2' 6 11675-11695 0 04/15/09 --•••4111101:4114'.'��111it ` 2' 6 11810-11875 0 04/14/09 ���11111111111, 2" 4 11947-12051 0 07/08/02 11111111111111, _ 2" 4 12100-12230 07/08!02 41111111111111, -� 2" 4 12255-12371 07/08/02 11111114111114 12928' —� PBTD 2" 4 12610-12695 07/08/02 ��1►1�►1►1►1►► 2" 4 12750-12805 07/08/02 2' 4 12875-12925 07/08/02 2-7/8"LNR,6.16#,L-80, .0055 bpf, ID=2.441" H 12960' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/13/79 ORIGINAL COMPLETION 04/13/07 CJN/PAG GLV C/O WELL: 07-13B 09/27194 SIDETRACK(07-13A) 04/16/07 RDW/TLH WAVER SFTY NOTE DELETED PERMrr No:'2021160 07109102 DAV/KK CTD SIDETRACK(07-13B) 05/31/09 ACB/TLH PERFS(04/15/09) API Nb: 50-029-20338-02 11/06/02 ADK/TP PERF CORRECTION 02/13/11 JLJ/AGR GLV C/O(01/28/11) SEC 33,T11 N,R14E,4651'FEL&290'FNL 05/30/06 DTM WELLHEAD CORRECTIONS 03/13/07 CJA/PAG SET CIBP @ 12065'CTMD BP Exploration (Alaska) CO 0 (O 0 N 0 CD N CO CO M ,- 0 t.. Q O O O O CO O O 6) h co N I. N- 0 a C O CD O O) 6) N- O 00 M 0 .� _ CD r";" (O r r m a. aD I. h.- m 0 a` vim, 0 U @ o LL U i-11. O C O CO N 01 CO CO n 6) 1- CO N O M CD CD d 6) CD co (O co r- VCO N.. W x- .7r. a NM O O M 6 N N6 f` M r O N N v v IC) CD O N CO CO N v N Z LO @ = V V 1- V' CC) Cn Cn LC) V CO M M O u) C) o — o -o > co oN o _ o 7 d c rn I° 0 u) y rn i' Z O v 0 0 0 0 0 0 0 0 0 0 0 J = < o cq o 0 o O O 0 0 0 0 0 O co m CD 0 , 0 co 6 6 U) Cci Cn ui U) ui v v o O O E to co co co co co co I- V) co 7 � p)•G m Co CO ,. 3C2 Jo •a N F M W p. N N- N- 1- CO M Cb N CD N CO U) 1 U ,a CO N Nt V . CO CO CO CO CO N N CN M 4 4 O 6) CO O CO 6) 4 CO 0 co co co M N N 1- CO CO N- O N C O 0) O O O C7 00 CO N- CD CD CO CO d _ _ _ _ _ `r.: ,- _ x- <- _ a- _ `r:c N O co co co co Co Co Co Co Co co co Co II m O W '- N u E = oc,) N c = c U C' LU Co co LU co N N CO CO Cb N 00 O oe m w m 'c 6) co C) I,- V <t CO W 0 C w y d 0 N Cn r 4 M N M N O M 4 N Co O N f..) ce m >, l0 m0. Cco OO (00 r � co ti W CO COO CO 00 00 oD cm) p Ix r Z 10 E o a a r v v v v v v v v v v v v v CI (() l() I) n In CO CO 1D CO CO In In (l) J o O co ' m m m r rn 0 CD CD 0) 0) 0) CO CO CO Cr) CD 0) = 0 Cr) m m CO 0 .n a t0 to to 0' z 10 o I I N- 704 C) CD LUD N 0 0 M N p 000 co co v- NCO COCD N 00 h CO 0 O, O O) W Co O O M W O 6 CO IA O) p 0 2 2 2 CO co U) CO (0 1"-- M N O gc7c'a0 co co CO CO M D) ; ; ; �) Cc? c7MMO m CO NI� COi� rr CD CO Co I� M NN OO (O COM CO 46) 4CO Oco O O CO OV' 6M NVrCI) CO M) COCO CD CD CD CO Z 0poo N$ v v v v v v v v v v v v v a $ >- : z— F CD222 M r co r co " 6) M O CA CO LO N- N- N- N U) v CO u) CO (D CO u) 0 0 I, CO h N 1- CO N CO M C) N- 00 O 1 O .44 U) CO co a) O N CO CO V' co co co co co a0 co O) 6) 6) 0) W 0) C) E G o co co ao o Lo 0 0 0 06 0 6 rn N N m n m E C'7 co CO CD O CO V" O O O CD CO O 7 6) LO CO CO 61 CO O CO O O C) CO CO OV n QO N CO CO T M M O• O ( coM O OMMMM m co M M MN N N N N iic Q a ) a as co m ¢— 00 m = r. -O ^ L O Q O T O O m N � M Z (7 � � C = m N v Cf) N- CO U) v 00 N 0 V" v4 Q N d N- CO CD C) CO LO n 0) O) v0 CU LC) .0 O 0 Co r 6i 0 0 0 chi Ci 6i 6i (.i r r r r Co CO N CO CO CO CO (o co L CO n n r r CO 00 Cl) 00 00 CO .c asC.) >. p Cb O) N J Q OO U N ~ a1 .�– O r r -LS O coM C E'I U Z 0 0 0 0 0 G OM _ _ _ O0 0 0 00 0 0 0 NN 0 0 C)N O COO) 0 0 0 0 0 0 0 O Cy O co N "1- , ve cci WlipO O O w O O O O O 6w O N D O co O CO ` OOO)+� G E O M M M M a. vvcv0 - (n (n 0 O CO 0 O co � ti cOo co LUco p \I IN m O - 0 CO p Cl. N-- O� � 112 as 0.v a as 0 c o m [w. Ep 0«G) Y) N c R n Z 0am330 co 0. CO N O O O O O _N C7) O O O O O O O CO O O 0 0 h Of cO (D M O O M O O O O O O O co W O O O O a C O O co co W O O O O O O O M M O O O O 0000 00 c0 00 D) 0) O) CO CO m au... co 0 V LLL r a a)cw o O N L O 7 CO (n 00 CO CD N h N CO M CO CO O) M CO Cr) N (O (() 0) N 3- U1) u) N et et 3 et U) CD M O) CD N O tD (D 3.0 CO CO O CO LO N V Q) O) O O O) Q) h 00 (D co M O) CD M O CD M (D O CO 4 L N N- h h 3-N 00 CO (f) O O O O) O) M O O O CO CO 00 = V N N CO CO et (C) (D h h CO O O) O) ON M O a j 01 o a) o O 0 a` o rn m 0 0) a)> a) O Z Zo 0 0 0 O O O O O O O O 0 0 0 0 0 C. o O 0 0 O \ = < o 0 O O O o o O 0 o 0 0 0 0 0 0 0 C. C. C. 0 0 0 M (p CO 0 3 a s v v v 0 0 v v v o 0 0 0 0 0 0 v v 0 0 0 0 d rn co � u) rn =,- o0 6 v M (D co O v CO N O N h (D (() (C) et M O O O CO h (O et ✓ .a N (O h O O M N M (D N O h (f) M 7 CO (n (n O N O 00 (D O O 7 (D (D 0 N N 4 O 0 — M CC) h O O M O O h V N • LO 7 co N CO CO 7 O (D (O (D N O h h CD CO O (O V M co M N N N O O O O O CO CO 00 h h (D to• u. C N x 0- 0- h h 0 O. 0 O N O O 0 n Ce C A CD CD CD CD CO CO (D (D CO (D CO CO (D CO (6 (DD COh (hD (h0 (hD (hD (D (D a) o w c a)• U io s c Um = C i Ci CO M (D M O CO N- (D00 N CO CO O N CO C7 h u) 0 CO 7 V' h E., C F„ . s CD N h CD O CO (n O CC) CD N CD a- u) O co CD et. 0 O CD M O w w o 0 N 4 CO O O (n 0 M4 cO h O N4 N O h O O d le T R O) co 7 h O M O N CO CO 7 CD h 00 O (O N et (L) h re L m a c h h (D (C) (f) V Tr Tr co N N 3- O O 00 h h h h CD (C) el. CO (n CO (O( ( co( CO ( co( ( o• O w L.33-...33-.. 7 in in 7 co co in in in co to to In M M M M M M M M M M = (!) (!) !) f) !7 4) f) 1) 17 (D (() o (D O (D u) (17 J 33 CI F- 2 2 co n C— O O O O O O O O O O O O O a) CO CO O CO O O 0) 0) O Z LL) u) u7 U) u) (Ci u) u7 (Ci (n u1 u) (O u) (Ci u) u) (D (n u) (Ci (fi (f) 0 a) h N CC) O CO O O O (C) O et CO CO h CO CO CO N N W CD CO CO c0V h co O N co O co (O CO O M Cb (C) h O O (D h M h u7 (D (n O N N N N N _ V u) CO N CO O h (n h M O et O et O V CO I- a O (C) O (D C 3- N CO et ell et (() Cf7 u7 CO (D Co h h [O CO 0) O O O O m o t g v 1. "t v I q v `f I v v v v -1:- v (n (ri ri H 0 U c0c0 CD (O N M (D CO CD O N CO M O r1 O C) O( ( h (D N CO (0 a. MCD CO N CD v (f) CO N h 7 (D N h CO CO CD h O 0 el- CO 4 O O u) O (D CD M h h O V h4 M6 (D O h M Q) O N CO 00 CO O (C) N V O LON- CO O 7 N O CO CO LO h CO O CA LO CC) et CO M CO N N 7 7 O O CO h h CD (C) (D in et_ M N N 00 (q ' . "t "t � Ti Trr d' Ni M M M M M M M M M M M M a (D O O et O O O (D CO N (D h CO CO (C) O CD O M O u) N CO 7 et h O O O O CO (f) (D M 0 00 (D M O O O N R h O N (D CO O O O O O O N Ni o h O N M 7 (C) O O er V' et et (D (C) (C) (D (D (D (() (O U) u) (C) CO CD (D (D (D CO CD CO U) O O O O O O O O O O O O O O 0) O O O O O O O O Ca O ccc0 Co 05 c0 06 c6 c6 Cb c0 CD co. O a0 CO o O CO c6 (D O c0 CO h 7 (O O O O CO O h h h h h h h h 7 N N N N N Co co h N O O O h co. h 03 CO CC) CO CO - N.: M O h h h u) O O O O O O O O N N CV N N N CO N N r 04 CV N CV NJ CV NJ N N NJ N N N N N CV NJ N N N N N N N N N N N N N N N N N N N N N N N N N CL 03 Q Cn O 00 00 CO O O O N CO O O O O O O O O CD CO CO CO CO 00 Q CO CO O L) O O O CO N O O O O O O O O N N N N N N . h 00 W O O O O O O 00 CO (10 00 00 CD CD C) O O O O O O m co co co CO O O O CO W W W W W W M W CO CO O [d CO CO CO ✓ T 0 ti L• o M M h O! j `_ R r ¢MZ 0_ co o o d OOOOQo 0 o O co O O O O O O () O h O o O O O >+ h (y O h 0 0 CO O 0 0 0 0 0 3- O CO .,- O O O O '31- • . O O O O O ,- O O O O O O O O O O (O O N I.!. O O O O 1� O O O O O ri 0 O O O O O O O O O COO O 0 O O O O Mimi 3 O O s- N N 0 M CO et O O (D h CO CD O 3- N N ( M el O (D p �■ C ` U) ^, N N N N ( N N O N N N ,- N N N N M M M N CO 0 („) ) M M M rT- y C 2 , ma- a as ti a a+ = o m o 'O .• d..C) G/ w l0 'Z 0cLCl)33o a co O O O O O ON. Q co O O O O O O c O O O O O O co0 as -8=-- o . .� o a) — ri c o c O 0 O N CO CO n O CO CO CO N O n N O N N O r- O C) 4 a N 'CO Q CO r c° O 0 j O0 dU > U)= 0 0 0 -c • oN o o a o > g, m 0 co a) a) Z Z 0 0 0 0 0 0 J ,- 7 < 0 0 0 0 0 0 CO m ao 0 i 6 0 0 0 0 0 a) .. j C Q 2 2NHfill -� .6 C) O rn N- N 0) .0 �t N O N O 0) C e L 0 0 O O O r` w d C c0 O LO CO 0 2 •y $ n n O O O O C N — CD CD CD CO CO CO B O w c d u di A a 2 u 0= m e u 0C) CO 0) CO v C a. 0 W O O N O 0) U w y N o a O O O O cD 0) t; m T (13 co N N a- CO O)) CO tC3 r d d C ri 0 02U) G c- L. O) D O L. L. Z 6 U) u) U) U) 0 0. 0 0 0 0) 0) v CO U) N- CO 0 N- rt O O c) r N O aI N- N CO CO 11 CO 0 V ui ori ori Lc? )r ori I- 0 U CO 0 N v CO a 0 0 03 01 0) v LO m 0) O O cD N co c) - CO UI) CO CO CO 0) CON N S - O (/)- 7 CCO N N N N 2 — CO ,- N- CO 0 N O CO O CO 0 0) O N- M V' 4) U) O T Cr) 0) 0) CO U) E O O O O O O CONNNN NN CO O O CO O N N N N N N NNNN NN co :. Q rn Q J CO CO CO CO CO O Q NNNN NN m 0) 0) 0) 0) 0) co co co co co co cts U >, E m ^ e e o 0 Q cn U • U C) M Cis z a co o o a 0 0 0 0 0 r� N 00 0 0 0 0 0 CO , V. ' v N 0 0 0 0 0 10 ,•-• O MiMI l = r-- co CO o .... o C .. U) 0�• M cam-• 0 1 ,��w ma- d g I P. Z M F $ry t s „, r - T o o i $ 7 b - g - o F P 1 , 8 i 8 , Ilk 1 t.z,9 !,..D o 4 I 1 lii i i--- ,,..4E 2: Ma: 8 0 gt111 m 2 R go ▪ n O 4-' _. 8 12 G 00 ▪ Gg O O _ d 8 8 o 0 _.._�- T K , =• m Y 7 4 m u Y m ry N N N ry OW OOZ)(+)quol�U(�)►�3nos .. • U Ala • .0 22 11. 41 4' 8 s o o is . o�ry m ry m M a. m s s a3 �� �Ao- 7,^ m la o .o ;o p8E888 $8488$ v aaoor. 0 .. .-.a vz "eZm8$$$$ee$e$ $8 N3c 11r oma � SX < oo —Sa oa o o te mmV8rmS3��Ro8e = _ F v - t- g`. s�1g8gg88t-888 a _ il ;- x a r. g mirillailliiiE :ME ',,, 3 EI ig sa .. 88'6,--,58888800 3 Ili- 1 X‘ zo ,pr4 , NNNrMc4ryr m< g i..i.. 56--2a8gs88838ig1Yy i ml .11 u;SS �'m^mm85SB��ffd � s rvomo Wo 0000e ,,c, ^ — m C ;8 pool en UMW (u!/8 08)4;daQ IBa►uaA anis BPPASSPORT BAKER HUGHES Travelling Cylinder Report 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling rig) Reference Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: 07-13 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore 07-13C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB B Pad B-07-B-07-B-07 13,872.11 12,125.00 588.55 1,189.98 -551.60 FAIL-Major Risk PB C Pad C-29-C-29-C-29 12,859.38 12,025.00 1,138.34 378.56 761.25 Pass-Major Risk C-29A-C-29A-C-29A 12,533.05 12,150.00 967.03 338.64 628.40 Pass-Major Risk PB DS 07 07-09_DO NOT USE-07-09A-Plan 10 14,135.06 11,100.00 1,565.30 151.01 1,418.16 Pass-Major Risk 07-10A-07-10A-07-10A Out of range 07-13-07-13-07-13 11,940.10 11,600.00 121.55 40.12 88.61 Pass-Major Risk 07-13-07-13A-07-13A 11,398.26 11,400.00 10.88 3.27 8.28 Pass-Major Risk 07-13-07-138-07-13B 11,400.00 11,400.00 0.23 1.31 -1.08 FAIL-Major Risk 07-13_DIMS-07-13A-07-13A Out of range 07-13_DIMS-07-13B-07-13B Out of range 07-14-07-14-07-14 Out of range 07-14-07-14A-07-14A Out of range 07-14-07-14B-07-14B Out of range 07-14-07-14BPB1 -07-14BPB1 Out of range 07-14-07-14C-07-14C Out of range 07-14_DIMS-07-14A-07-14A Out of range 07-14_DIMS-07-14B-07-14B Out of range 07-14_DIMS-07-14C-07-14C Out of range 07-14_DIMS-07-14C-07-14C Out of range 07-28-07-28-07-28 Out of range 07-28-07-28A-07-28A Out of range 07-28-07-28AL1 -07-28AL1 Out of range 07-28-07-28B-07-28B Out of range 07-28-07-28BPB1 -07-28BPB1 Out of range 07-29-07-29-07-29 Out of range 07-29-07-29A-07-29A Out of range 07-29-07-29APB1 -07-29APB1 Out of range 07-29-07-29B-07-298 Out of range 07-29-07-29B-Plan#11 Out of range 07-29-07-29BPB1 -07-29BPB1 Out of range 07-29-07-29C-07-29C Out of range 07-29-07-29D-07-29D Out of range 07-29_DIMS-07-29-07-29 Out of range 07-29_DIMS-07-29A-07-29A Out of range 07-29_DIMS-07-29B-07-29B Out of range 07-29_DIMS-07-29BPB1 -07-29B PB1 Out of range 07-29_DIMS-07-29C-07-29C Out of range 07-29_DIMS-07-29D-07-29D Out of range 07-30-07-30A-Plan#5 Out of range 07-32-07-32-07-32 Out of range 07-32-07-32A-07-32A Out of range 07-32-07-32B-07-32B Out of range 07-32-07-32B-Plan#2 Out of range 07-32-07-32PB1 -07-32PB1 Out of range 07-32_DO NOT USE-07-32-07-32 Out of range 07-32_DO NOT USE-07-32A-07-32A Out of range 07-32_DO NOT USE-07-32B-07-32B Out of range 07-32_DO NOT USE-07-32B-Plan#2 Out of range 07-32 DO NOT USE-07-32PB1 -07-32PB1 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 3/16/2011 3:44:24PM Page 3 of 17 COMPASS 2003.16 Build 73 War BPPASSPORT BAIQR HUGHES Travelling Cylinder Report 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 07-13-Slot 13 Project: Prudhoe Bay TVD Reference: 22: 13 9/8/1994 00:00 @ 52.26ft(generic drilling rig) Reference Site: PB DS 07 MD Reference: 22:13 9/8/1994 00:00 @ 52.26ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: 07-13 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 07-13C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 07 07-37-07-37-07-37 12,877.94 12,425.00 27.75 163.60 -132.51 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 3/16/2011 3:44:24PM Page 4 of 17 COMPASS 2003.16 Build 73 8 il, 45 U U C 1111 W' F o o (dbud a 188888P.:2828487.38 ; H Z E y j '� 0$,a,$0000$o." o o i ss ssss s s g g ss�ss g a6y�aF- 9 ooma o.a.o o w w s sR 3ss:ys s s 'As gss9FAsi$ -9 391931 d' Y t. U' .'.e: 3� SS 655 y .645 + s 6 B SPS SQ6666 6 5 �a4 3 e y7 �- �3A A�9�A� 9%�6 ���� �' $m$ $3 �R8$� a942- �F $6 sF 6 aF6 gg �ffi > .. .9 a s.saII23 g;a4 y 4 sasyg94 3coii99 i9 ii yyqii iIIqIqIIII�/Mg O ji g 4 I MA j N veef3 S lsbs6 �evee 163?42es 2.._ _ yy 26 53~�e€a n ~ri se44':sA 9 A97 AAAA591 A yo s' 12iNi o 3.88 b e 311U5 ,10 Ea i : YM91U j'; LO II 8mmmmmmm &St SS a a LLLLg pg$pg OO o E eQ �E�� 1 _ rl'g23'48gA888M cIR s: 888PAmmm882Ett 9 V Hill IMF P8888`.,$r9PAte4 48 ;.-s2sp9g3w4,1ixii. 3s m as °� S caWWIIaN. go o _ o _s' U 8 1- 0 W 2 E 0. 2 a V _W Amis o P\*SisliiN\I u) i VOIONI\ • "E till - U 0 itilllettLu) Mpg co . v tot riii J . i!j_c+ e. A V ■e e p _6•• C ei:II 1- SIIINThillara % a. 7N• 7 N N I po pop N p; N N d I 41 I -I 4. ig 6 G C N �� f iy n o _ �� 1 3 I I - Mal s a Y Ia = a g 8 II III I � I 1 1 l 1 U U Ore I' ■ E . .�L 1II 3 I I �; -Lf ,i V V g . h` 1 ,v i o Q o s u — I , i o Ci co I II . 1 un Iiii Hem I I II g I Z I i 1- e I l Q OggWI —I 0 G =U' 1111 I go- U4/ U , • , • U ' Otorl • 1111 0 3W H • i =1 : I— J I o �, E W LLI l ir ] ^>���� a a 'll' _ • •82 II; W 0 il U 75. E i . — IllII _ al at ,A I- •mss N >_ Q I 11 U U I o I 1 p Z a 12 t ► 1 I I m b z iii II I 1H V A I ® n�Iwassmasto Y 11 rIi 1 i � to 8 I z i,1=1 U �1I Contat Info Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, April 14, 2011 9:36 AM To: 'Leemhuis, Jacob' Subject: DS 7-13B P &A(202-116) (PTD 211-054) Per our phone call I added a step after BOP testing (Step#1) to run Packer Whipstock , set at 11390' md. and pressure test . Next step#2 is milling Window. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Leemhuis, Jacob [mailto:Jacob.Leemhuis@bp.com] Sent: Thursday, April 14, 2011 9:20 AM To: Schwartz, Guy L (DOA) Subject: Contat Info Guy, As requested, here is my contact information. Jacob C. Leemhuis Drilling Engineer Coiled Tubing Drilling Office: (907) 564-4989 Mobile: (907) 223-6792 Jacob.Leemhuis@bp.com 4/14/2011 Alaska Department of Natural ;ources Land Administration System Page 1 of/k Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number. 28309 itgi Printable Case File Summary See Township,Range,Section and Acreage? • Yes No New Search LAS Menu I Case Abstract I Case Detail l Land Abstract File: ADL 28309 Map Search for Status Plat Updates As of 04/13/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type:784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status:35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 27 Section Acres:640 Search Plats Meridian: U Township: 011N Range: 014E Section: 28 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 33 Section Acres:640 Meridian: U Township: 011N Range: 014E Section: 34 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-13011N 14E UM27,28,33,34 2560.00 U-3- 7 12-01-1986***LISBURNE PARTICIPATING AREA *** T. 11N.,R. 14E., U.M. SECTION 27:ALL 640 ACRES SECTION 28:ALL 640 ACRES SECTION 34:ALL 640 ACRES CONTAINING 1,920 ACRES,MORE OR LESS. End of Case Summary http://dnr.aaska.gov/projects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2 83 0... 4/13/2011 Alaska Department of Natural P,sources Land Administration System Page 1 of 1 Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources find Alaska DNR Case Summary File Type: ADL File Number: 28310 fid-'Printable Case File Summary See Township,Range,Section and Acreage? 4' Yes 0 No ( New Search LAS Menu I Case Abstract! Case Detail I Land Abstract File: ADL 28310 Slap Search for Status Plat Updates As of 04/13/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status:35 ISSUED Status Date: 08/19/1965 Total Acres: 2491.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 014E Section: 29 Section Acres:640 Search Plats Meridian: U Township: 011N Range: 014E Section: 30 Section Acres:604 Meridian: U Township: 011N Range: 014E Section: 31 Section Acres:607 Meridian: U Township: O11N Range: 014E Section: 32 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-131 11N 14E UM29,30,31,32 2491.00 U-3- 7 End of Case Summary Last updated on 04/13/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7,IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2831... 4/1 3/20 1 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME del.' O?-JAG PTD# Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ,PWLIs/G 0,9)/ POOL: 7:36 --zr. Yt�G. Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 0 V o rp- 'n CO n '3 3 a o m1 o � -, 0 (n � 'co CD 3 r 3 O m -, 0-1 N.cn A D A D f4 A 0 o XI o m 0 m 7 0 7 n _o m iv o CD (D - -i W W W W W W W W j W N N N N N N N N N N - - CO CO -4 0) 01 A CO N O Co CO CO V O 01 A W N 0 O Cb V 0) 01 A W N -+ 0 O W O C)) A W N C 0 -4Z ,D• m n Cr) 0 O K m g c) rp fA O �. D D 0 0 n n (n n o D n m O O r m z • n P. O o m CD ID (D ° 7 p p Q n ° n v c o = v m m ° ° Q c 7 cD m o x. v 7 C)) n ° o = m m a m m 7 m m ° m m m n) 7 Q 3 7 Cp is m - ,0 m a -i -i -i m a1:3 - 3 3 < ...4 °' 3 n oo r CD �. D) m CD m m o CD c c o < < n c m o o °' d o 0 0 ° ° o -1-1---: y E.- n n C) 7 (D 'O (n 0) 0 N _ O O CD C) o N n CD n n 0 O N 7 C) n C) 7 7 m 7 n 0) N 0) C) n = N N °- c CD N n ill 0) n O d 01 0) O. 00(7> 0) ) cCD N X N O 7 CD 7 N CD O 7 N O O_ Cn 0 a s 0) n . D 7 7 7" o 0) CD CD CD o 2 7 m Cl) m co m o ° m j• 3- N 0 N Q N * o = (0 W o N (Q 0) 07 N 'O (O N - . '00 (cn N --O a N (fl -0 .l°O 0) CD '00 3 N D a 0 0 7 c ^' -' O c° 3 N d co _, o n CD CD o 'O n A j' -O c c 0 - O co co a CD -o N n S?o 7 m m o m o m m m o n» Q m Q ° - m i (� ° Z ° n o c ° ° a o A ° O ° o m ° Q a m v ° ° a o o O °o o m o m v m F m n m v o m v in n CD - Q -• -• m .o -° - v N m 7 Z 7 .< R. o a O N o 0 7- w v 7 m a v CD cr m y °7 > > Q c ° a D o B� m' �_ o m g m - v o m c m a c m o o Q �' o m CD 0 m `< Q of v 3 o 0 ° o o °) »� v Q O < 5' m m g Q o D C xl 1 c Fn.CDd n ° v D� m o c.D7 Q o n a co ° o ° ° c m v n n 0 3 m D CI) O II cn CD •. cf) cn 0 o - 7 n -o w r. - 0 o 7 Q o c Q o o cn '� _ 7(s:2 7U '0 7" N "o fD (D 7 (D Qp -s a 7 to 7 7 0 (D 3 7 7 n - 3 3 j > p 0 7 m cn 7 m m o 0 0 W m o C ° �' Q m o a o a m O- 'CO CD a v cp D n w o Qo o �_ n61) m w = n co i CD m Ui 0 'a o' ° m ° �_ ° °a a) oo.o ' .‹ -cow v v7v°' a N n mCD SD oo w ° am °� n QD n- m °0 A (Q W 7 cn 0 5 n CT -0 CCD D v rn y n _ N o c 7 `< O c 3 c Cu 4 -n 0 7 c 2 ..,1 (I)CD N 0 N n N ° (D SU IV O 3 o co N w N. o cn < CD o p O 0 CD a o. 7 r 5' N w m 0 CD 0 a A � � m m o 5. (11 7 _ O ? m 7 ° xt a _ , 7 N 7 • < m c ..�— ° o m - CD n N O 3 1 O ? Cr)CI) N m 0 ZZZzz z -< -< -< -< -< -< z -< -< -< -< -< zzzz zzz -[ -< -< -< -< -< -< -< -< -< -< -< Zz 'FT; 1 > > > > 0 > !nm m ° o 0 o > o o ° ° ° > > > > > > > O O O O 0 0 0 0 0 0 0 0 > > \ '�0 (I) m V W W * 73. N -0 c c o coz _ m 0 X N X 5- o ° w °°- 0) v a F O m o v c z 0 < 7 n ° v 3 o c - co m (o) 0. O N 3 a `< V C0D o n n o W coN () W a) . 0 (n "O 7 O) 0) o D 3 CD G7 3 b 07) Q m CD 5'cn 5' o o_ D Fri X 0 n. a 0o (o F. � 5. CO CO 0) 7 -. CD CD Cn 0) .3- Cp Co CCD m ° O 0 a m 0- N '< . w C° Co m (0 ° Cr) c CO m °) m o n O o p a c — m o z fD ° 0 2 fn CD C0 -0 (n co (.J n CD u m 3 - °) O CD W 0 3 ° 7 w -. o < is CD (n 7 m Z 0) o O A Q n 3 - v ) 0 <) CO CD Cl) m V (D N N = W j CO 0 3 p �• v °^ < 5 co p C F o a w 0 C) O cn = (n z CO cn j a o 1 n o 0 ES Z Y b o -0 ° ° 'oco co co 0 ma m o 3 C c) c� CD < 0 ,, m 0 o- = Z. v w 0, Q w - 3 7 V •(n cn Q o Fp,- O V V (A CD cci N P. n D 3 CD N CD O n - m CD CD * 7 * 0- N = ] ° -O D 7- Co N a co O ° CO N (0 * 7 - O CD n 3 = 0 O N O 3 O co 7 .c) 0) Cl) 7 o D j co c - 0) CS ▪ O O (o N In o c0 cn 0)