Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout180-129
:..
r'-- STATE OF ALASKA r'\
ALASKA .L AND GAS CONSERVATION COM¡ ./SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Zero Other
5. Date Comp., Susp., or Aband. . /
~ t{, fl:). Z-öt:>Y-
6. Date Spudded ~!:'f
02/03/1981 çJ-¡'
7. Date TD. Reached
03/25/1981
8. KB Elevation (ft):
39.3'
1b. Well Class: /
D Development ~ Exploratory
D Stratigraphic Test D Service
12. Permit to DIiII Number
180-129"""'" 304-036
13. API Number ../
50- 029-20527-00-00
14. Well Name and Number:
Sag Delta #5 (SAGO-OS) /'
15. Field I Pool(s):
Wildcat
No. of Completions
1a. Well Status: D Oil D Gas D Plugged ~ Abandoned D Suspended D WAG
20AAC 25105 20AAC 25 110
FDC/CNUSP/CAL, CBL, MUPUCAL, HDT, RH, Velocity Survey,
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
Top BOTTOM Top BOTTOM SIZE
39' 120' 39' 120' 26"
39' 2728' 39' 2728' 17-1/2"
39' 9520' 39' 8452' 12-114"
9029' 11063' 8042' 9780' 8-1/2"
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL
TEST PERIOD ...
CALCULATED..... OIL-BBL
24-HoUR RATE"""
CORE DATA
Brief description of lithology, porosity, f!'ß..ÇN!,~s....a.p~rent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "non~"i'c: ~;.~ .O:J ¡ ~~.......<--.i R E C E IVE D
None :.. L{d,-~.:..d
:~- '~_.)O !"11 G \ N A L MAY 1 4 2004
;\ Alaska Oil & Gas Cons. Commission
MAynCîOf69;OO4 ~ y
0 GINJ D WINJ D WDSPL
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
2322' NSL, 727' EWL, SEC. 36, T12N, R15E, UM
Top of Productive Horizon:
N/A
Total Depth:
3782' NSL, 4730' EWL, SEC. 36, T12N, R15E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 717981 y- 5980753 Zone- ASP~.-
TPI: x- y- Zone- ASP4
Total Depth: x- 721939 y- 5982330 Zone- ASP4
18. Directional Survey
DYes
~No
21. Logs Run:
DIUBHCS/GRISpml,
22.
CASING
SIZE
20"
WT. PER FT.
94#
72#
47#
29#
GRADE
H-40
L-80
L-80
L-80
13-3/8"
9-518"
7"
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
26.
Date First Production:
Not on Production
Date of Test Hours Tested
Flow Tubing Casing Pressure
Press.
27.
Form 10-407 Revised 12/2003
9. Plug Back Depth (MD+ TVD)
Surface + Surface
10. Total Depth (MD+TVD)
11063 + 9780
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSl
Ft
Ft
16. Property Designation:
ADL 034630
17. land Use Permit:
20. Thickness of Permafrost
Discontinuous
CBL, Gyro Survey
CEMENTING RECORD
12 cu yds Arcticset to Surface
3488 cu ft PF II to Surface
1322 cu ft Class 'G', 130 cu ft PF 'C'
720 cu ft Class 'G'
AMOUNT
PULLED
24.
TUBING RECORD
DEPTH SET (MD)
PACKER SET (MD)
SIZE
None
TVD
25.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
300' Set Bridge Plug /" /'
To Surface Set Surface Plug wi 38.4 Bbls Permafrost Cement
~~~~
GAs-McF
CHOKE SIZE I GAS-OIL RATIO
OIL GRAVITY-API (CORR)
W ATER-BBL
CONTINUED ON REVERSE SIDE
RBDMS BFL
28.
r-.
GEOLOGIC MARKERS
29.
I"'""'\:ORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List inteNals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Lisburne Group
9837'
8720'
None
RECEIVED
MAY 1 4 2004
Alaska Oil & Gas Cons. lJUffdTííSsion
Anchorage
30. List of Attachments:
Summary of Work, Well Schematic Diagram
'\
and corrr to the best of my knowledge.
(1/ I~ Title Drilling Engineer
180-129 304-036
Permit No. I Approval No.
Date
S/I 4/0 4-
31. I hereby certify that the
Signed
David Reem
Sag Delta #5 (SAGD-05)
Well Number
Prepared By Name/Number:
Dnlling Engineer:
David Reem, 564-5743
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of SeNice Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, ObseNation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing InteNal).
The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEMS:
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one inteNal (multiple completion), so state in item 1, and in
item 23 show the producing inteNals for only the inteNal reported in item 26. (Submit a separate form for each additional
inteNal to be separately produced, showing the data pertinent to such inteNal).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
r-.
SAG DELTA #5
~
FINAL PLUG AND ABANDONMENT
..
Prudhoe Bay, Alaska
Il-May-2004
Prepared By: Fairweather E&P Services, Inc.
--
"""
--
Page 1 of3
wo.
,,-...,
~
Background Information:
Sag Delta #5 was an exploration well drilled in 1980 by the Sohio Alaska Petroleum Company, a
heritage company of BP Exploration, Alaska Inc. The well had minor testing performed prior to
the operator effectively plugging and abandoning the lower section of the wellbore in 1981. This
was accomplished by setting a series of bridge plugs and cement plugs in the liner to cover the
perforated intervals, by placing a cement plug and bridge plug to cover the liner lap at 9029' and
by displacing a balanced cement plug at 2560'. The well was shut in with a 100' diesel cap and
CaCI brine above the topmost cement plug.
BPXA, in an ongoing effort to remediate old well sites, set forth in February 2004 to complete
the abandonment of Sag Delta #5 in conjunction with the abandonment of Sag Delta #2A and
other wells. An ice road was constructed and equipment was mobilized to finalize abandonment
of the well without the use of a workover or drilling rig. Sundry Approval was obtained to
circulate out the diesel cap, attempt to circulate out sufficient Arctic Pack from the 9-5/8" x 13-
3/8" annulus and place a minimum 150' cement plug in both the 9-5/8" casing and the 9-5/8" x
13-3/8" annulus.
The following well work summary details the well work performed on this project. Attachment I
is a schematic of the well as it is currently configured.
Work Summary and Daily Activities:
14-Feb-2004
15-Feb-2004
6-Mar-2004
8-Mar-2004
l-Apr-2004
4-Apr-2004
-;;¡o
~ .
Mobilize Fairweather crew. Cut caisson on well cellar for removal. Dig out
and warm up equipment in yard. There will be delays in P&A work due to
equipment backlog and inclement weather.
Load out well house to location. Remove cellar caisson and set well house over
well.
Mobilize hot oil unit to location. Tighten all tbg hgr packings and pressure test
tree to 1500 psi - OK. RDMO hot oil unit.
Mobilize slickline unit to location. Run 3.80 drift and bailer to 325'. POB and
RDMO slickline unit.
Mobilize slickline unit to location. Strip 8. auge ring under adapter flange
and RIB to 300'. POB. Strip in CIBP 30' and set. MIU slickline BOPE ----
and tbg punch. RIB. Punch casing wI trIes from 296' to 285', POR.
Connect test pump and pump Y4 bbl diesel to verify perfs open and circulation
established. Shut in well.
Mobilize cementing equipment to location. Rig up to 13-318" and pump brine
down, taking returns from 9-5/8" casing. Plugged offwl 7.1 bbls away. Re-rig
to pump down 9-5/8" casing and take returns from 13-3/8". Pump 95 bbls brine
to flush out casings. Circ te ut 15 bbls diesel and Arctic Pack. Pump 5 bbls
fresh water followed by 8.4 bls permafrost cmt. Good returns - circulated 7 ----
bbls cement to surface. ar tree and RDMO cementing equipment.
..
Prepared By: Fairweather E&P Services, Inc.
Page 2 of 3
"
-~
--
..
E:--
,
-~
-=
7-Apr-2004
9-Apr-2004
10-Apr-2004
ll-Apr-2004
...
",.-.-..
,.-."
Check well for pressure - OK. Use string and nut to tag cement at 10' below
ground level. RID back-flow line to tank. Apply nitrogen to wing valve. Blow
back brine to backflow tank. N/D back-flow line, wing valves and adapter
flange on tree. SID for night.
MOB light plant and backhoe to site. Remove well house, tree and casing wing
valves. Remove debris from around cellar. Start excavation, remove caisson
from cellar. Continue excavating, segregating ice, clean gravel and potentially
dirty gravel. SID for night.
Mobilize casing saw and compressor. Finish excavation around well to required
depth. Excavate access trench into hole. Lower saw onto 20" csg, set same.
R/U backhoe to wellhead. Cut all casing strings and cement. p~ stub and
weld on marker plate. Witnessed by AOGCC rep J. Spaulding. Back-fill hole
and release backhoe. Load out mise equipment and iron junk.
v
Take delivery of additional gravel for mound over well. Wheel-walk mound to
compact. Final mound height approx 4' above original ground level.
.-
--
Page 3 of 3
Prepared By: Fairweather E&P Services, Inc.
--
;,
""'"
,
~
D
0
Proposed
As is
PTD: 180-129
API:
50-029-20527 -00
,-...,
~
Sag Delta No.5
Prudhoe Bay
BP Exploration (Alaska) Inc.
Cement plug from 300' BGL to surface. All casing strings severed
5' below mud line datum or 13' below island surface.
9.8 ppg CaCI2
TOC - 2201'
I
26"Hole .II'
20" 94# H-90 @
120' w/12 Yds3 Cmt
/
Casing punch 296' - 285,
five holes
Bridge Plug 300'
-Arctic Pack
17 1/2" Hole
133/8" 72# L-80
@ 2728' 3488 Ft3
Permafrost II
DV Collar @2600'
Cemented WI 130 Fe
Permafrost II
Cement Plug
2560' - 2650'
~
7" 26# L-80 @ 11,063' ~
720 cu ft Class G
¡ Estimated TOC - 5300'
Spud Date: February 3, 1981
12 1/4" Hole
ATTACHMENT I
Date Suspended: April 13,
1981
All depths are RKB Measured
Depths
Sag Delta No.5 -
Cement Retainer @ 8800'
Cement Plug 8897' - 9080"
Liner Hanger &
Top of 7" I..iner
@ 9029'
9 5/8" 47# L-80@ 9520'
Cemented With
1322 ft3 Class G
Cement Plug 9808' - 10,095'
Cement Retainer @ 10,095'
Perforations 10,160' -10,170'
Perforations 10,230' - 10,260'
Peñorations 10,620' - 10,650'
Cement Plug 10413'.10,700'
Cement Retainer @ 10,700'
Peñorations 10,720' - 10,770'
PBTD @ 10,994' MD
TDf@ 11,063' MD (9779' TVD)
Fairweather E&P SeNices, Inc.
Rev. OOWJP 11-May-Q4
.
.,
'-""
."""
Drawing Not to Scale
r
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg V (})¡. {r ~lÂ\ok DATE: April 10,2004
P. I. Supervisor ~l
FROM:
John Spaulding,
Petroleum Inspector
SUBJECT: Surface Abandonment
Sag Delta 5
PTD 180-129
Thursday April 10. 2004: I traveled to BPXA's wildcat well Sag Delta 5 location to
inspect the casing cut-off and surface abandonment of the well.
All casing strings were found to be cut off approximately 10 feet below original
grade and all casing strings full of cement to surface. A 3/4 inch thick marker plate
was welded to the conductor casing with the required information welded to it.
SUMMARY: I inspected the surface cement plug, casing cut-off and the P&A
marker plate on the Sag Delta 5 well and found all to be in order.
Attachments: Sag Delta 5 plate on well.jpg
Sag Delta plate.jpg
Sag Delta 5 cut off.jpg
NON-CONFIDENTIAL
surface p&a sag delta 54-10-04 js.doc
Sag Delta #5 (BPXA) Suñace Abandonment Inspection
Photos from AOGCC Inspector John Spaulding
April 1 0, 2004
[ Marker Plate
Casing cutoff 10 ft
below grade; cement
to surface
Marker Plate Installed
2004-0410- Surface _Abandonment- SagDelta#5.Js.doc
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg,. 7a¡ð 4\qlDk
P. I. Supervisor ¡-L
DATE:
April 4, 2004
FROM:
John Crisp,
Petroleum Inspector
SUBJECT:
BPX Sag Delta #5
PTD 180-129
Surface Plug Cement Job
April 4. 2004: I traveled to BPX's Sag Delta #5 to witness the surface plug
cement job.
I witnessed the 13 3/8" x 9 5/8" casing annulus circulated alternating between
pumping down the 9 5/8" to pumping down the 133/8" wi 9.8 heated brine. Arctic
Pac was circulated out of the 13 3/8" x 9 5/8" annulus. Pumping down the 9 5/8"
casing I witnessed the entire 9 5/8" casing to 250' MD along wi the 9 5/8" x 13
5/8" annulus cemented wi 35 bbl's Arctic Set cement with a density of 15.8 ppg.
Summary: I witnessed Plug & Abandon work performed on BP's Sag Delta #5.
Attachment: None
NON-CONFIDENTIAL
Plug & Abandonment Sag Delta #5 04-04-04 JC.doc
30-January-2004
Commissioner(s)
Alaska Oil and Gas Conservation Commission
333 w. ih Ave., Suite 100
Anchorage, AK 99501
Re: Application for Sundry Approval;
Permanent Abandonment: BP Exploration (Alaska) Sag Delta NO.5 (PTD #180-129).
Dear Commissioner(s):
BP Exploration (Alaska) Inc. (BPXA) hereby applies for Sundry Approval of its plan to permanently r~
plug and abandon the Sag Delta No.5 well. The Sag Delta No.5 was an exploration well drilled by
the Sohio Alaska Oil Company (Now BPXA) in 1980. The well had minor testing performed prior to
effectively plugging and abandoning the lower section of wellbore in 1981. This was accomplished
by setting a series of bridge plugs and cement plugs in the liner to cover the perforated intervals, by
placing a cement plug and bridge plug to cover the liner lap aJ 9029 ft, and by displacing a
balanced cement plug at 2560 ft and suspending the well. /"
BPXA is constructing an access ice road and intends to plug and abandon both the Sag Delta No.
2A and Sag Delta No.5 well's this winter. The anticipated well work start date is late-February,
2004.
The plug and abandonment procedure will require displacing out a 100 ft diesel cap at surface and
attempting to circulate out sufficient Arctic Pack in the 9 5/8" x 13 3/8" annulus to leave a final 150 ft r"'"
minimum length cement plug in both the 9 5/8" wellbore and 9 5/8" x 13 3/8" annulus at surface.
The proposed P&A procedure calls for performing the procedure using a Schlumberger coil tubing
unit currently under contract with BPXA. Upon re-entry, if conditions are discovered that require the
mobilization of a work-over or drilling rig to complete the procedure, arrangements will be made to
take advantage of the ice road.
Pertinent information attached to this application includes the following:
1 . Two (2) originals; AOGCC Form 10-403 (Application for Sundry
Approval) for the well;
2. Two (2) copies; Well plug and abandonment program for Sag Delta NO.5 with schematics
showing both the current configuration and the proposed changes.
Page 2, Commissioner(s) Contd...
If you have any questions or concerns, please contact the undersigned at 564-5743, or Duane Vaagen
at 258-3446. Thank you for your assistance in this matter.
S' \ cerely;
\
i
'C~
David Reem
BP Exploration (Alaska) Inc.
Attachments
cc: Jason Moncrieff (BPXA)
Duane Vaagen (Fairweather E&P Services, Inc.)
VJ~A ']..1$ I woLf
0 Y:S 2-(5/'4-
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
Operational shutdown
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
1. Type of Request:
Abandon ..¡
Alter casing D
Change approved program D
2. Operator Name:
Suspend
Repair well D
Pull Tubing D
Perforate Waiver
Stimulate D Time Extension D
Re-enter Suspended Well 0
5. Permit to Drill Number:
Exploratory 0 180-129 ,.-
D 6. API Number:/
50-029-20527 -00
Annular Dispos.
Other D
D
D
BP Exploration Alaska, Inc.
3. Address: P.O. Box 196612
900 E. Benson Blvd, Anchorage AK 99519
7. KB Elevation (ft):
Development
Stratigraphic
Service
9. Well Name and Number:
Sag Delta NO.5 ,/'
39.32'
8. Property Designation:
10. Field/Pools(s):
ADL 34630
Wildcat (Exploration)
11.
Total Depth MD (ft):
11063'
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft):
2560' 2560'
Total Depth TVD (ft):
9779'
Plugs (measured):
See Attachment
Burst
Junk (measured):
NA
Casing
Structural
Conductor
Length
Size TVD
20" 94# H-40 120' 120'
133/8" 72# L-80 2728' 2728'
95/8" 47# L-80 9520' 9520'
7" 26# L-80 11,063'
Collapse
120'
2728'
1530 psi
5380 psi
520 psi
2670 psi
Surface
I ntermed iate
Production
Liner
9520'
2034'
Perforation Depth TVD (ft):
6870 psi 4760 psi
7240 psi 5410 psi
Tubing MD (ft):
N/A
Well P&A'd: No I Suspended
Perforation Depth MD (ft):
N/A Plugged
Packers and SSSV Type:
NIA
12. Attachments: Description Summary of Proposal
Detailed Operations Program D BOP Sketch D
14. Estimated Date for
Commencing Operations: Î a.fe - FebY'uar "2004
16. Verbal Approval: ate:
Tubing Size:
N/A
Tubing Grade:
N/A
N/A Plugged
Packers and SSSV MD (ft):
NIA
13. Well Class after proposed work:
Exploratory 0 Development
15. Well Status after proposed work:
Oil D GasD
WAG D GINJ D
..¡
D
D
Service
D
D
0
D
Plugged
WINJ
Abandoned
WDSPL
Commission Representative:
17. I hereby ~~~ that the foregoing is true and correct to the best of my knowledge.
Printed Namr, - r A V 1> C ~ REEï&t1. Title SV', We II~ En .
Signature' . oJ Phone 56 4- - 5 :14 3 Date
COMMISSION USE ONLY
Contact
David Reem
Conditions of approval: Notify Commission so that a representative may witness
Sundry Number:
-tJ3b
...30
Plug Integrity ~
~
BOP Test D
Mechanical Integrity Test D
Other: " ey; -l¡ a.vtlUvl u v~t¡""l r yOCR 11M M- ~ U..... Æ1X¡ CL ,
Location Clearance
RECEIVE:D
FEB 04 2004
BY ORDER OF
THE COMMISSION
COMMISSIONER
INSTRUCTIONS ON REVERSE
RBDMS afL Subm ÆBuPOc~e 2004
OQIGINAL
5CANNE,D FEB 1 8 2004
Well P &A Program: Sag Delta No.5
PTD: 180-129
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
File and insure all necessary permits and applications are in place.
Notify AOGCC of pending well work operations. ~
Construct ice road and prepare pad for use.
Thaw and inspect wellhead, lubricate and function test valves and test all for
residual pressure.
Displace out 100 ft diesel cap at surface with 12 ppg CaCh (current well bore fluid
reported to be 9.8 ppg CaCh). Provide 24 hour notice to AOGCC inspectors of /'
pending placement of surface cement plug and provide chance to witness same.
RIB with e-line and gauge ring to ~270 ft to verify proper drift 10.
RIB with e-line and set 9 5/8" CIBP between ~ 250 - 270 ft BGL. /"
RIB with e-line and casing punch perforating gun, perforate casing just above
CIBP set in step #7.
Circulate around heated brine while alternating pmnping down 9 5/8" x 13 3/8"
annulus with returns up 9 5/8" wellbore and vice-versa to remove as much Arctic
Pak as is possible or until clean returns observed. I f not possible to circulate, re-
shoot casing 10' above interval shot in step #8. Repeat step #9. (Every attempt
will be made to place a minimum 150+ ft length cement plug in both the 9 5/8"
wellbore and 95/8 "x 13 3/8" annulus. If unable, AOGCC will be notified and a
waiver will be requested to proceed based on depth achieved.)
When circulation achieved, circulate at least two calculated hole volumes based
on CIBP set depth and perforation depth. /"j
Pump surface cement plug in wellbore by pumping4";Y~1?ls 15.8 ppg Arctic-Set
IT or equivalent permafrost type cement. Actual fin~hement volumes to be
calculated from final parameters established by steps # 7 and 8. After good /
cement returns observed at surface, pump 1.5 bbls warm water behind to displace
upper 20 ft of well bore to water. Close annular valves.
Swab water out of casing at surface to leave room for internal cut if needed.
Excavate to 15 ft minimum below island surface for external casing cut. If water
encroachment prevents excavating to depth required, prepare to cut casing strings
using shape charge explosives in step # 15.
Cut casing strings a minimum of 5 ft below mud line datum or 13 ft minimum
BGL using mechanical casing saw or torch. Will attempt to cut at 15 ft if
possible. (The island surface has been measured at 3 ft AMSL and mud line at toe
of island is 5 ft BMSL (bathymetry charts). An additional 5 ft below mud line //
datum requires the casing strings to be cut a minimum of 13 ft below island
surface.)
If unable to excavate to sufficient depth for external casing cut, mobilize in
specialist with explosive shape charges and cut casing strings a minimum of 13 ft
below island grade level. Attempt to sever at 18 ft BGL if possible.
-¥:-
Sag Delta No. 2A P&A Program
1/27/2004
Page 1 of2
16.
If casing strings cut externally in step # 13 above, install 1i" steel plug and
abandonment marker plate of sufficient size to cover all casing strings including
20" conductor. If casing strings were severed using explosives, no marker plate is
required, proceed to step #17. Marker plate to include the following information:
Operator Name
Well Name
Permit to Drill No.
API No.
BPXA
Sag Delta No.5
180-129
50-029-20527-00
/-
17.
Remove cellar and all debris, and leave mound over site of well to sufficiently
compensate for future thaw and settling, and to prevent ponding. Manifest out all
waste wellbore fluiçis.for Class II injection disposal.
File Form 10-4&tïRd well work report indicating final well status with AOGCC.
Return in summer with AOGCC inspector after thaw for visual inspection and
obtain final site clearance.
/'
18.
19.
dhv/ rev 4
Sag Delta No. 2A P&A Program
1/27/2004
Page 2 of2
Sag Delta No.5
Prudhoe Bay
BP Exploration (Alaska) Inc.
D
[Ð
Proposed
100' Diesel Column at Top
26" Hole
9.8 ppg CaCI2
As is
20" 94# H-90
@ 120' 12 Yds3
Cement
Arctic Pack in 9 5/8" x 13 3/8"
annulus to surface?
13 3/8" 72# L-80
@ 2728 ' 3488 Ft3
Permafrost II
.I)~.~;
;:)1 DV Collar @2600'
-;'::f Cemented W 1130 Ft3
';':> Permafrost II
Cement Plug 2560' - 2650'
PTD: 180-129
API: 50-029-20527 -00
Spud Date: February 3, 1981
Date Suspended: April 13,
1981
All depths are RKB Measured
Depths
121/4" Hole
Estimated TOC - 5300'
ATTACHMENT I
Cement Retainer @ 8800'
Cement Plug 8897' - 9080"
Liner Hanger &
Top of 7" Liner
@ 9029'
9 5/8" 47# L-80@ 9520
Cemented With
1322 ft3 Class G
Perforations
10,160' -10,170'
Cement Plug 9808' - 10,095'
Cement Retainer @ 10,095'
Perforations
10,230' - 10,260'
Perforations
10,620' - 10,650'
Cement Plug 10413' - 10,700'
Cement Retainer @ 10,700'
Perforations
10,720' - 10,770'
8 1/2" Hole
PBTD @ 10,994' MD
TD @ 11,063' MD (9779' TVD) ..,
o. -.
7" 26# L-80 @ 11,063'
720 cu ft Class G
Sag Delta NO.5
Fairweather E&P Services, Inc.
Rev. 04 DHV 26-Jan-2004
Drawing Not to Scale
. .
Sag Delta No.5
Prudhoe Bay
BP Exploration (Alaska) Inc.
/'
0
D
Proposed
As is
Cement plug from 250' BGL to Surface. Casing Strings Severed
/5' Below Mud."tine Datumor 13' minimum below island surface.
171/2" Hole'
',': --.' Casing Punch 240' ,
, Eight .3" Holes @ 4SPF
Bridge Plug 250' ./'
Arctic Pack
[:' ~!
26" Hole J.-¡ <:~
20" 94# H-90 @
120' w/12 YdS3 Cmt ,.',"
9.8 ppg CaCI2
TOC - 2201'
13 3/8" 72# L-SO
@ 2728 ' 3488 Fe
Permafrost II
., DV Collar @2600'
Cemented W 1130 Ft3
Permafrost II
Cement Plug
2560' - 2650'
/'
PTD: 180-129
API: 50-029-20527 -00
Spud Date: February 3, 1981
Date Suspended: April 13,
1981
All depths are RKB Measured
Depths
Liner Hanger &
Top of 7" Liner
@ 9029'
Estimated TOC - 5300'
12 1/4" Hole
ATTACHMENT II
}~/\, Cement Retainer @ 8800'
,/;; Cement Plug 8897' - 9080"
l{;;
95/8" 47# L-80@ 9520'
Cemented With
1322 ft3 Class G
Cement Plug 9808' - 10,095'
Cement Retainer @ 10,095'
Perforations 10,160' - 10,170'
Perforations 10,230' - 10,260'
81/2" Hole
Perforations 10,620' - 10,650'
Cement Plug 10413' - 10,700'
Cement Retainer @ 10,700'
Perforations 10,720' - 10,770'
PBTD @ 10,994' MD
TD @ 11,063' MD (9779' TVD)
7" 26# L-80 @ 11,063'
720 cu ft Class G
Sag Delta No.5
Rev. 04 DHV 26-Jan-04
Drawing Not to Scale
o, RECEIVED
STATE OF ALASKA March 23, 2001
ALASKA OIL AND GAS CONSERVATION COUl~~ e. Con.crv.tie. comm,~ion
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
12.
[x] Abandon [ ] Suspend
[ ] Alter Casing [ ] Repair Well
[ ] Change Approved Program [ ] Operation Shutdown
Name of Operator
BP Exploration (Alaska) Inc.
(Sohio Alaska Petroleum Company)
Address
900 E. Benson Blvd.
Anchorage, AK 99503
] Plugging
] Pull Tubing
] Re- Enter Suspended Well
5. Type of well:
[ ] Development
[X] Exploratory
[ ] Stratigraphic
[ ] Service
Location of well at surface
2322' NSL, 727' EWL, Sec. 16, T.12N., R. 15 E., UM
At top of productive interval
1447' North and 3773' East from surface location
At effective depth
2322' NSL, 727' EWL, Sec. 16, T.12N., R.15 E., UM
At total depth
1461' North and 4003' East from surface location
Present well condition summary
Total depth: measured 11063 feet
true vertical 9779 feet
Effective depth: measured 2560 feet
true vertical 2560 feet
Plugs (measured)
Junk (measured)
[ ] Time Extension [ ] Perforate
] Vadance [ ] Other
[ ] Stimulate
6. Datum Elevation (DF or KB)
39.32 ft. RKB
7. Unit or Property Name
8. Well Number
Sag Delta No. 5 (36-12-15)
9. Permit Number
180-129
10. APl Number
50-029-20527
11. Field and Pool
Exploratory
CMT. plugs: 10,413-10,700, 9,808-10,095
8,897-9,080, 2,560-2,650
Bridge Plugs: 10,700, 10,095, 8,800
None
Casing Length Size Cemented
- Structural -
20" Conductor 120' 20" To Surface
13 3/8" Surface 2728' 13 3/8" To Surface
9 5/8" Intermediate 9520' 9 5/8" 9520' to 5300'
- Production - - -
7" Liner 2034' 7" full liner length
MD TVD
120' 120'
2728' 2728'
9520' 8515'
11,010' 9733'
Perforation depth:
measured
True vertical
10,720'-10,770', 10,620'-10,650', 10,230'-10,260', 10,160'-10,170'
(see attached wellbore schematic)
Tubing (size, grade and measured depth)
None
Packers and SSSV (type and measured depth) * 9 5/8" X 13 3/8" annulus contains arctic pack
None from 2600' to surface
13. Attachments [ ] Description of Sumary Proposal [X] Detailed Operations Program [ ] BOP Sketch
14. Estimated date for commencing operation 15.
Early April 2001
If proposal was verbally approved
Name of approver Date Approved
Contact Engineer Narne/Number: ~ ~cf2z),~l~ ~t-~'~
16.
Status of well classification as:
[ ] Oil [ ] Gas
Service
Prepared By Name/Number:
[X] Suspended
17.
I hereby certify that the foregoing is true and correct to the best of my knowledge
Signe~/,~~~_.~_~ Title
Commission Use OnlyJ
Location Clearance
Date
Conditions of Approval:
Mechanical Integrity Test~
Notify Commissio. n so representative may witness
Plug integrity ~ BOP Test
Subsequent form required 10- ~(~ ~
ORIGINAL SIGNED BY
D TRvlnr e,-,,.,--.
Approved by order of the Commission
Form 10-403 Rev. 06/1 §~86
Commissioner
Date ~/'/~4/ I
Subrflit In Triplicate
RECEIVED
March 23, 2001
Alaska Oil and Gas Conservation Commission
OPERATIONS PROGRAM Anchorage
PERMANENT WELL ABANDONMENT
BP EXPLORATION (ALASKA) INC. (BPXA)
SAG DELTA NO. S
PTD: 180-129
AP1 No. 029-20527
1. Obtain all required permits and regulatory approvals before starting any
field operations. Complete all BPX HSE requirements before job start-up.
2. Mobilize all required personnel and equipment to Sag Delta No. 5 via sea
ice road or rolligon.
3. Hold safety meeting before starting work on the well.
.
Erect prefab shelter over well and apply heat to wellhead with hot air
heater and steam line. When ice in cellar is thawed, remove water with
super sucker or vacuum tank. Continue to apply heat to dry out cellar.
Function test wellhead valves, lubricate and service valves as necessary.
Remove 4 inch blind flange on 4 inch 5,000 psi valve on top of wellhead.
Open valve slowly and check for pressure. Note that no BOP's are
amicipated for tbs proem since all downhole plugs have been set and
}~Bved by the AO~C. ~g up flow nipple to recover diesel.
Run in hole to approximately 130 ~. below ground level with open end 1
inch steel pipe ~d circulate out diesel cap in 9 5/8 inch casing with 9.8
~Q~~~pg~__ CaCh. Recover diesel in waste oil ta~. POH with 1 inch pipe.
~g up wkeline unit.. ~ t~ough 4 inch valve to 200 feet below island
surface with performing gun. Shoot 4 each ~A inch holes in 9 ~ inch
casing at 200 feet. Using lubricaor or wireline packoffto avoid loss of
fluid kom hole. POH Mth perforating ~n.
Rig up test pump on 4 inch valve. Open wing valve on "B" section of
wellhead and gradually pump into 9 % inch casing. Check for flow of
arctic pack (or crude oil, if possibly that was used instead of arctic pack)
from wing valve. Do not exceed 1500 psi. If arctic pack or crude oil can
be displaded from 9 % inch X 13 % inch annulus, continue displacement
with 9.8 ppg CaCh until clean returns are observed at surface. Then go to
Step 9 below. If no fluid can be displaced from 9 % inch X 13 % inch
annulus under 1500 psi pressure, bleed off pressure and proceed to Step 10
below. (Skip Step 9)
.
RECEIVED
March 23, 2001
Alaska Oil and (}as Conservation Commission
Anchorage
Rig down test pump and remove 4 inch valve and 4 inch X 13 % inch
adaptor flange from wellhead exposing 9 % inch casing. Rig up wireline
unit and set bridge plug in 9 % inch casing at 300 feet below island
surface. Rig down wireline unit and make up casing severing charge.
Lower charge into 9 % inch casing to 190 feet below ground level. Hold
safety meeting before initiating this phase of work. Detonate charge and
cut 9 % inch casing. Recover cutoff portion of casing using crane and
casing jacks, as required. Leave "B" section of wellhead in place to
facilitate fluid recovery from subsequent operations.
~OV-,t..,~%~-~'~'~v[ ~,.~.C~~. Rig up cement mixing and pumping module. Using 2 inch open-ended
l~K\ '~ ~2~~ pipe, run in hole to bridge plug in 9 % inch casing (if Step 9 implemented)
' or to 175 feet below island surface (if Step 10 not implemented). If only
going to 175 feet, push "poor boy" cement retainer in hole ahead of pipe.
Mix and pump sufficient permafrost cement to fill wellbore to -15 feet
below original mudline (approximately 20 feet below island surface).
Specific cement slurry volumes will calculated in the field, depending on
approach used. Have plug witnessed by AOGCC. Recover displaced
wellbore fluids in vacuum tank. If Step 9 not implemented go to Step 11
after completing Step 10. If Step 9 implemented, skip Step 11 and go to
Step 12.
11.
Cutoff wellhead below 13 % inch starting head, exposing 9 % inch X 13 %
inch annulus. Run into annulus with 3A inch steel pipe to 200 feet below
island surface, or as far as pipe will go if 200 feet depth cannot be
achieved due to plug formed by arctic pack. Mix and set a permafrost
cement plug in annulus. If % inch pipe cannot be advanced to
programmed depth, get AOGCC approval for whatever length annulus
plug can be achieved. Collect any displaced annulus fluids in vacuum
tank and give AOGCC representative opportunity to witness annulus plug.
12. Rig down cementing equipment. Excavate and remove cellar box.
13.
Continue to excavate below cellar box to expose 20 inch conductor at a
point approximately 10 fi. below the original mudline (-4 fi.). Cut and
remove a segment of the conductor and expose the cement in the 13 3/8
inch X 20 inch annulus. Break out cement and expose 13 3/8 inch casing.
Rig up safety line on casing to prevent casing sections from falling into
excavation as further cuts are made. NOTE: Conduct special safety
meeting prior to initiating steps 13 and 14.
14. Cut 13 3/8 inch and 9 5/8 inch casing and remove cutoff sections for
backhaul.
RECEIVED
March 23, 2001
Alaska Oil and Gas Conservation Commission
15. Trim up casing stubs and weld a 30 inch X 30 inch X ½ inch steel ~~
plate identifying well on 20 inch conductor at approximately 9 ft. below
island mudline. Backfill excavation to island grade, but leave small
mound of gravel over excavation to allow for natural compaction after
island surface thaws the following summer. Attachment III shows the
post-abandonment condition of the wellbore.
16. Pick up any debris on location and move to next well in program, or
demob to Deadhorse, as directed.
17. File new Form 10-407 with AOGCC referencing the new P&A well status.
18. Return to Sag Delta No. 5 location the following summer to pickup any
minor remaining debris exposed after snow melts, and to conduct a final
location inspection with the AOGCC and DNR.
Sag
Present Condition
RF( FIVI::I
March 23, 2001
Del fo N o. 5 oA~)~a Oil and Gas Conservation C.on
(os of December 5, 2 Anchorage
PTD: 180-129
APl: 029-20527-00
Directional Hole
Spud Date: Feb. 3, 1981
Date Suspended: April 13, 1981
LEGEND
CEMENT
DIESEL
MUD
FORMATION FLUIDS
CoCI2 BRINE (wt. unknown)
ARCTIC PACK
WELLHEAD AND
WELLHEAD SHELTER IN PLACE
~+ +++++ ++~+ +
Elev. (RKB): 39.32 ff. AMSL
All depth shown are RKB
measured depths.
TOP 100' OF WELLBORE
FILLED W/DIESEL
20" 0 120'
CEMENT PLUG 2,560'-2,650'
DV COLLAR O 2,600'
13 5/8' O 2,728'
EST, TOC 0 ~5,500'
/
CEMENT RETAINER ~ 8,800' '~
CEMENT PLUG 8,897'-9,080'
LINER HANGER Q 9,029'
PERFS ~ 10,160'-10,170'
9 5/8" O 9,520'
CEMENT PLUG 9,808'-10,095"~/
CEMENT RETAINER ~ 10,0.95'~/2
PERFS {~ 10,250'-10,260'
PERFS ~ 10,620'-10,650'
PERFS ~ 10,720'-10,770'
__;EMENT PLUG 10,415'-10,700'''~
CEMENT RETAINER O 10,700' ~"'
C.O. TD ~ 11,010'
7" ~ 11,065'
NO SCALE
FAIR/PROPOSAL/SAG5A 1:1
nission
Sag Delta No. 5
Proposed Permanent Abandonment Condition
PTD: 180-129
APl: 029-20527-00
Directional Hole
Spud Date: Feb. 5, 1981
Date Suspended: April 15, 1981
LEGEND
CEMENT
MUD
FORMATION FLUIDS
CaCI2 BRINE (wt. unknown)
ARCTIC PACK
CASING STRINGS CUTOFF AT
>10' BELOW MUDLINE DATUM
Elev. (EKB): 59.52 ft. AMSL
All depth shown (3re RKB
measured depths.
20" 0 120'
SURFACE CEMENT PLUGS IN
9 5/8" CASING TO 150' BELOW
CUT OFF LEVEL, AND AS DEEP
AS POSSIBLE (NOT TO EXCEED
150') IN 9 5/8" X 1.3 3/8"
ANNULUS.
CEMENT PLUG 2,560'-2,650'
DV COLLAR ~ 2,600'
15 5/8' ~ 2,728°
EST. TOC 0 ~5,300'
CEMENT RETAINER ~ 8,800'
CEMENT PLUG 8,897'-9,080'
LINER HANGER ~ 9,029'
PERFS ~ 10,160'-10,170'
,9 5/8" 0 9,520'
CEMENT PLUG 9,808'-10,095'
CEMENT RETAINER ~ 10,0.95'
PERFS {~ 10,250'-10,260'
PERFS ~ 10,620'-10,650'
PEEFS ~ 10,720'-10,770'
~;EMENT PLUG 10,415'-10,700'
CEMENT RETAINER 0 10,700'
C.O. TD 0 11,010'
7" 0 11,065'
NO SCALE
FAIR/PROPOSAL/SAG5B 1:1
SR .3/8/01
I II
Re: Sag Delta 8 and Sag Delta 5
Subject: Re: Sag Delta 8 and Sag Delta 5
Date: Wed, 04 Apr 2001 16:40:57 -0700
From: Tom Maunder <tom_maunderi~admin.state.ak. us>
To: Julie Heusser <julie_heusser(~admin.state.ak. us>
Julie,
Following up on your questions regarding a wellhead drawing and the use of
a vibratory hammer on one of the wells.
Bob Gardner was over and did provide a wellhead sketch. The drawing does
not have a lot of detail. The wellhead was manufactured by McEvoy which
was a pretty standard type for the time.
The procedure differences with regard to using a hammer or explosive. The
#8 welt was drilled from an artificial island and due to the built up
height has a greater distance from surface to the intended cutoff point
below the island base. It is not mechanically feasible to dig out to such
depth, hence the use of explosives. The #5 well was drilled from a natural
island. With essentially no added freeboard, it is feasible to
mechanically dig as deep as possible and then use the vibratory hammer to
remove the tubulars. Bob indicated that he would prefer to use the hammer
on all removals and avoid explosives altogether.
Bob indicated he would welcome the opportunity to meet and discuss the
project at your convenience. Let me know if you need further details.
Tom
Julie Heusser wrote:
Hel 1 o Tom,
I'm reviewing the proposed Sag Delta 8 and Sag Delta 5 abandonments.
Why is on Sag 8 they propose using a vibratory hammer to remove the
casing and conductor while on Sag Delta 5 they make no mention of this?
Given these two procedures were apparently written by the same
individual and submitted at the same time, I can only infer that there
is some difference between the two wells. Any idea what it might be?
Either way, our abandonment regs indicate
Tom Maunder <tom maunder@admin.state.ak.us>
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of I 415101 9:19 AM
01/01/01 14:27 FAX 907 564 5190
DESCRIPTION
~ 3" 5M Valve
!~ 4" 5M Valve
21!
~ 5M Blind Flange
BP EXPLORATION
¥~LL SAG DELTA
15 AprIL 1981
~GR EORE
1/16"
KBE: 48.70' ~SL
BFE: 38.10 '
DESCRIPTION 5~GR BOKE
12 1/2"
-- ,
26"
26"
RECEIVED
APR 0 4 2001
Alaska Oil & Gas Cons. Commission
Anchorage
[ 4 ]
%~ x, SAG D~LTA ~8
APRIL 15,1981
, o
BP EXPLORATION
To:
David W. Johnston
Chairman
Alaska Oil & Gas Commission
From:
Steve Herren, Drlg Mgr
Shared Services Drilling
ARCO Alaska, inc.
Subject: Sus.~ended wells
Compliance with regulations
In response to your letter dated August 15, 1994 regarding suspended wells
attached are lists detailing well status and criteria for maintaining these wells
in a suspended status. Plans for well inspections are in place for October 1
through October 3, 1994 as discussed with Blair Wondzell and John
Spaulding. Updated reporting has been filed with the commission as listed.
Yours Sincerely,
Steve Herren
Drilling Manager
Bill Bredar
Patrick Collins
Jim Farnsworth
Mike Miller
Bruce Policky
Scott Sigurdson
Marian Sloan
RECEIVED '
OCT 1 4 1994
Alaska 0il & Gas Cons. Commission
Anchor~a
Suspended Wells, Request to retain suspension status
The following wells are listed as suspended by the AOGCC under 20 AAC
25.110. These wells are requested to remain suspended for the reason(s) as
indicated. Site inspections should be conducted as soon as possible.
MPA-01; 029-20376-00
79-.,¢04
Potential recompletion in the Kuparuk C and/or B
sand as a water injector. Decision hinges on
1994/95 development drilling results (E-13)in
this area.
MPB-02; 029-20662-00
81-/¢'142
This well is scheduled for initial completion in the
Schrader Bluff late this year or early next year.
MPA-03; 029-20891-00
83-~001
Future utility as a Schrader Bluff producer with
producing utility when surface infrastructure is
installed on A pad.
MPN-01 B; 029-21053-02
84-0O 13
N-01 B is a usable well in the Schrader Bluff, with
producing utility when surface infrastructure is
installed on N pad. The well should be retained
in a suspended status until that time.
MPC-16; 029-21364-00
85-01 10
C-16 has recompletion potential in the Kuparuk
"C" sand and/or the Schrader Bluff horizons.
Although additional evaluation must be
performed to quantify reserves and production
potential, C-16 is believed to be a viable
workover and/or sidetrack candidate.
NWM#1; 029-22231-00
91-0145
Northwest Milne #1 should remain suspended
until the Northwest Milne Point development is
better defined. The wellbore is strategically
located on a gravel island and may. possess
utility in either production or injection operations.
DNR recently certified this well as capable of
production.
No Point #1;029-22450-00
94-0027
No Point #1 will be utilized in the upcoming F-
Pad development. Expectations are to complete
the Kuparuk "A" zone and commence production
4Q95.
Niakuk ¢4, 029-21217-00
84-0200
Niakuk ¢4 is requested to remain suspended
until the viability of the well for monitoring is
defined.
Niakuk ¢5, 029-21290-00
85-0027
Niakuk ¢5 should remain suspended for
observation purposes at this time.
Sag Delta ¢33-12-1 6, 029-201 76-00
75-0058
Area being drained by 1994 Alapah well NK-26
(HAW). Potential use as a monitor well for this
new reservoir
Would have to truck oil across winter ice road if
resume production
Produced 186 MBO in 1985 2 month production
test.
Sag Delta ¢5, 029-20527-00
80-0129
Area being drained by L5-26 (high gas well),
L5-28, and L5-36 from south to west.
Well tests indicated fairly tight, but productive
rock; perhaps inadequate stimulation?
Costs prohibitive for eventual tie-in to L5 (? via
Heald Point). Potential for gas cap monitor well
Sag Delta 31-11-16, 029-2001
69-0014
1-00
Area being drained by L4-36, 80 Acre offset to
NW. Potential for service well (water injection?)
Well is capable of production, but most Lisburne
in water leg and costs likely prohibitive for tie-in
to L4.
Sag Delta ¢2A, 029-20234-01
77-0069
South of Sag Delta ¢1, in water leg of Alapah oil
accumulation in NK-26 well. Remote potential
for pressure monitoring of Alapah offtake and
the effect on the Alapah aquifer; though, costs
would likely be prohibitive.
Sag Delta #8, 029-20519-00
80-0121
Z-32A, 029-21924-01
93-011 3
S-10A, 029-20765-01
91-0123
Sag Delta #8 should remain suspended until the
development plan for the area is better defined.
This well may possess utility for production or as
an observation well.
Z-32 was shut in due to high water production in
1992. In 1993 it was sidetracked to a new
location. The oil column at the new location was
less than prognosed and was not considered
economic and the well was suspended. There is
oil in the area that can be reached as a new
sidetrack from this well. A specific location has not
yet been identified, but we wish to retain this
wellbore for a future sidetrack.
S-10 was sidetracked in 1992. Drilling difficulties
were encountered while drilling through a fault in
the Kingiak and the well was suspended. There is
oil in the area that can be reached as a new
sidetrack from this well. A specific location has not
yet been identified, but we wish to retain this
wellbore for a future sidetrack. The West Sak
formation, a non unitized formation in the PBU
license area, is reachable from this wellbore.
Work in ongoing on a facility sharing agreement.
In the case that a satisfactory agreement is
reached, this wellbore could be used to access oil
in this formation.
Y-22A, 029-21558-01
88-0115
Y-22 was sidetracked in 1988. The sidetrack was
suspended due to drilling difficulties. There is oil
in the region that can be reached as a new
sidetrack from this well. A location has not been
worked on but we wish to retain this wellbore for a
future sidetrack.
U-01, 029-22244-00
92-0011
There is oil in the area that can be reached as a
new sidetrack from this well. A specific location
has not yet been identified, but we wish to retain
this wellbore for a future sidetrack.
PR 33-12-13, 029-20047-00
69-0104
The well penetrates The West Sak and Ugnu
formations in the aquifer. Work in ongoing on a
facility sharing agreement with subsequent
appraisal of the formations. This well could be
used to test the aquifer properties.
These wells are listed as suspended, action items are detailed.
Ak Island #1,289-20018-00
81-0119
Alaska Island #1 was abandoned in 1988. The
completion notice has been refiled with AOGCC
on 9/15/94. The site is ready for inspection
(priority 1 ).
Niakuk #lA, 029-20156-01
76-0028
Niakuk #lA was abandoned in 1991. A sundry
application requesting status change was filed
with AOGCC 9/20/94. A completion notice will
follow when the sundry application is approved.
The site is ready for inspection (priority 1).
Niakuk #2A, 029-20180-01
76-0079
Niakuk #2A was abandoned in 1991. A sundry
application requesting status change was filed
with AOGCC 9/20/94. A completion notice will
follow when the sundry application is approved.
The site is ready for inspection (priority 1).
PBU H-01, 029-20099-00
71-0015
The well was drilled in 1971 and hit a down
thrown fault block with only 20ft of oil bearing
Ivishak. This was not economic at the time. It was
left suspended without tubing. Recent success in
fraccing the Sag formation indicated that it might
be an economic well. A rig workover was
completed in April 1994 and the well was put on
production 9/94. It is not necessary to inspect this
site.
Kemik Unit #1,223-20006-00
70-0060
Kemik Unit #1 is scheduled to be abandoned in
the near future. Abandonment planning is now in
progress. Site,inspection will not be necessary at
this time most likely should be scheduled for
Spring of 1995.
P2-59, 029-22096-00
90-0140
Arco Alaska Inc. is the operator of this well, they
will be addressing the question of suspension.
Sag Delta #3, 029-20233-00
79-OO8O
Well plugged and abandoned March, 1991. Well
completion notice will be refiled with the
Commission.
Sag Delta #4, 029-20245-00
77-0015
Well plugged and abandoned March, 1991. Well
completion notice will be refiled with the
Commission.
The following wells are not under BP Exploration ownership. A letter
requesting the owners to respond regarding their wishes for these wells was
sent on 9/30/94.
MP 03-10-12, 029-20483-00
80-0066
MP 33-11-12, 029-20504-00
80-0092
CHEV 18-11-12, 029-20511-00
80-0108
Term C 03-11-12, 029-20356-00
78-0102
MP 22-31-11-13, 029-20545-00
81-0010
MP 43-31-11-13, 029-20536-00
80-0139
MP 30-11-13, 029-20546-00
80-0152
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: David~ DATE:
Chairman
THRU: Blair Wondzell, ~:~~ FILE NO:
P. I. Supervisor '~/~
FROM: John Spaulding,~. SUBJECT:
Petroleum Insp. ~)~l~,[~ .¢~
October 2, 1994
2991jbbd.doc
Suspended Wells Inspection
North Slope, Alaska
October. t,2&3, 1994: I accompanied Marian Sloan BPX representative on an
inspection tour of BPX suspended wells at various North Slope locations. Travel was by
pickup and helicopter.
Marian Sloan Informed me that BPX is drafting a program with reasons for leaving wells
listed below as suspended, this program will be available to the AOGCC in the very
near future
Oct. 1,1994
Y-22A / PBU / PTD 88-115; well head on configuration, no pressure on tubing or
annulus, area very clean, well is located on a producing drillsite.
S-10A / PBU / PTD 91-123; wellhead on configuration, no pressure on tubing or
annulus, area clean, well. is located on a producing drillsite.
U-01 / PBU / PTD92-11; wellhead on configuration, no pressure on tubing or annulus,
area clean, well is located on a producing drillsite.
Z-32A / PBU / PTD 93-113; wellhead on configuration, no pressure on tubing, 750 psi
on inner annulus, 0 pressure on outer annulus, area clean, well is located on producing
drillsite.
Chevron 18-11-12 / PTD 80-108; wellhead on configuration, no pressure on tubing or
annulus, area clean.
MP 22-31-11-13 / PTD 81-10; wellhead on configuration, no pressure on tubing or
annulus, area clean, reserve pit is still open.
MP 32-30-11-13 / PTD 80-152; wellhead on configuration, no pressure on tubing or
annulus, area clean, reserve pit is still open.
Oct. 2, 1994:
A-01 / MPU / PTD 79-40; wellhead is removed with casing hanger still on, area clean,
well is located on a active drillsite.
A-03 / MPU / PTD 83-01; wellhead on configuration, no pressure on tubing or annulus,
area clean, well is located on a active drillsite.
B-02 / MPU / PTD 81-142;. wellhead on configuration, no pressure on tubing or
annulus, area clean, well is located on a producing drillsite,
C-16 / MPU / PTD 85-116; wellhead on configuration, no pressure on tubing or
annulus, area clean, well is located on a producing drillsite.
N-01B / MPU / PTD 84-13; wellhead on configuration, no pressure on tubing or
annulus, area clean with timbers covering the cellar area and well guard around the
wellhead.
No Point #1 / MPU / PTD 94-27; wellhead on configuration, area clean, unable to land
helicopter to check wellhead for pressures, No Point #1 is scheduled to become part of
the F- pad construction at MPU.
, NW Milne #1 / MPU / PTD 91-145; wellhead on configuration, area clean, island is
suffering from severe-erosion on the North side.
Oct. 3, 1994:
Sag Delta 31-11-16 / PTD 69-14; wellhead on configuration, area clean, has wooden
location marker, no pressure on tubing or annulus.
Sa.q Delta #3 / PTD 76-80; wellhead on configuration, area clean no pressure on tubing
or annulus.
Sag Delta ~4 / PTD 77-15; wellhead on configUration, area clean, no pressures on
tubing or annulus.
Sa,q Delta #2A / PTD 77-69;. wellhead on configuration, no pressures on tubing or
annulus, timbers and cellar box material, reserve pit open.
Sag Delta #5 / PTD 80-129; no wellhead; bell shaped affair was covering the supposed
well surface location, area clean.
Sa.q Delta #8 / PTD 80-121; wellhead on configuration, timbers and well guard, island
is eroding.
Alaska Island #1 / PTD 81-119; unable to land, area appeared clean from the air,
marker post visible on South side of island.
Niakuk #4 / PTD 84-200; wellhead on configuration, concrete river weights, cellars
open, island eroding.
Niakuk #5 / PTD 85-27; wellhead on configuration, concrete river weights, cellars open,
island eroding.
Location Clearances;
Niakuk #lA / PTD 76-28; area is clean, no visible marker post, island is eroding as
planned.
~Niakuk #2A / PTD 76-79;...area-is-clean;-.no-visible-marker-post; .island is -eroding as
planned.
I recommend that the AOGCC consider Niakuk lA & 2A for final abandonment and
location clearance.
, Summary: I inspected locations of 28 BPX suspended wells. I also inspected 2 wells
for final abandonment and location clearances.
ALASKA OIL AND GAS
CONSERVATION COMMISSION
..WALTER J. HIGKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
August 15, 1994
Steve Horton, Drlg Mgr
BP Exploration (Alaska) Inc
P O Box 196612 (MB12-1)
Anchorage, AK 99519-6612
Re:
Suspended Wells
Compliance with regulations
Dear Mr. Horton:
BP Exploration and the predecessor Sohio companies have several
suspended wells as shown on the attached lists: BP SUSPENDED WELLS
PRIOR TO 1980 and BP SUSPENDED WELLS SINCE 1980.
The applicable regulation is as follows:
20 AAC 25.110 SUSPENDED WELLS (a) Upon application by the
operatOr under 20 AAC 25.105(e), the commission, will, in its
discretion, approve the suspension of a well if the well
(1) encounters hydrocarbons of sufficient quality and
quantity to indicate the well is capable of producing in
paying quantities as reasonably demonstrated by well tests
or interpretive formation evaluation data; or
(2) is reasonably demonstrated to have future value as a
service well.
For each well on the attached lists of suspended wells, please provide
data showing that the well meets the criteria of (1) or (2) above, or
advise as to your plans to abandon the well.
Wells that meet the criteria of (a) above that you wish to maintain as
suspended, as r/e~qui_~20 AAC 25.110(e), must have well site
inspections ~is ye~tgr~-~t% snow covering the locations.
Chairman ~'
Attachments
c: Blair Wondzell
bew/11 bpsusp
15194
PERMIT
79-0040-0
80-0066-0
80-0092-0
80-0108-0
80-0121-0
80-0129-0
80-0139-0
80-0152-0
81-0010-0
81-0119-0
81-0142-0
83-0001-0
84-0013-0
84-0200-0
85-0027-0
85-0110-0
88-0115-0
90-0140-0
91-0123-0
91-0145-0
92-0011-0
93-0113-0
94-0027-0
API NUMBER
029-20376-00
029-20483-00
029-20504-00
029-20511-00
029-20519-00
029-20527-00
029-20536-00
029-20546-00
029-20545-00
089-20018-00
029-20662-00
029-20891-00
029-21053-02
029-21217-00
029-21290-00
029-21364-00
029-21558-01
029-22096-00
029-20765-01
029-22231~00
029-22244-00
029-21924-01
029-22450-00
BP SUSPENDED WELLS SINCE 1980
AUGUST 1994
WELL WELL
WELL NAME CLASS STATUS
MILNE POINT UNIT A-01 EXP SUSP
PRUI)HOE BAY UI~IT 3-10-12 DEV SUSP
PBU MP 11-33-11-12 I DEV SUSP
PRUDHOE BAY U~IT TR 18-11-12 DEV SUSP
SAG DELTA 8 EXP SUSP
SA= DELTA 5 EXP SUSP
PRUDHOE BAY LTNIT 31-11-13 DEV SUSP
PBU MP 32-30~11-13 I DEV SUSP
PBU MP 22-31-11-13 2 DEV SUSP
ALASKA ISLA~TD I EXP SUSP
MILNE POINT UNIT B-02 DEV SUSP
MILNE POINT I/NIT A-03 DEV SUSP
MILNE POINT UNIT N-01B DEV SUSP
NIAKUK 4 EXP SUSP
NIAKUK 5 EXP SUSP
MILNE POINT UIqIT C-16 DEV SUSP
PRUDHOE BAY LT~IT Y-224 DEV SUSP
PT MCINTYRE P2-59 EXP SUSP
PRUDHOE BAY LTNIT S-10A DEV SUSP
NORTHWEST MILNE I EXP SUSP
PRUDHOE BAY LTNIT U-01 DEV SUSP
PRUDHOE BAY LTNIT Z-324 DEV SUSP
NO POINT i DEV SUSP
STATUS
DATE
4/15/8o
10/11/80
4/29/81
12/24/80
4/~5/81
4/13/81
2/2o/81
1/18/81
2/14/81
6/08/82
5/27/82
12/10/83
4/27/84
2/17/85
4/18/85
10/27/93
10/29/88
12/22/90
11/06/91
3/30/92
3/16/92
8/31/93
4/08/94
SECT
23
33
33
07
27
36
05
30
30
11
19
23
30
25
25
10
33
14
35
25
18
19
06
TWP
13N
11N
11N
11N
12N
12N
10N
11N
11N
10N
13N
13N
12N
12N
13N
11N
12N
12N
14N
11N
11N
13N
010E
012E
012E
012E
016E
01SE
013E
013E
013E
022E
011E
010E
010E
015E
01SE
010E
013E
014E
012E
009E
013E
012E
010E
PAGE
MER
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
15/94
PERMIT
69-0014-0
69-0104-0
70-0060-0
71-0015-0
75-0058-0
76-0028-0
76-0079-0
76-0080-0
77-0015-0
77-0069-0
78-0102-0
API AK/MBER
029-20011-00
029-20047-00
223-20006-00
029-20099-00
029-20176-00
029-20156-01
029-20180-01
029-20233-00
029-20245-00
029-20234-01
029-20356-00
BP SUSPENDED WELLS PRIOR TO 1980
AUGUST 1994
WELL WELL
WELL NAME CLASS STATUS
SAG DELTA 31-11-16 EXP SUSP
PRUDHOE BAY I/NIT 33-12-13 DEV SUSP
KEMIK U~IT I DEV SUSP
PRUDHOE BAY UI~IT H-01 DEV SUSP
SAG DELTA 33-12-16 EXP SUSP
NIAKUK 1-A EXP SUSP
NIAKUK 2-A EXP SUSP
SAG DELTA 3 EXP SUSP
SAG DELTA 34633 4 EXP SUSP
SAG DELTA 28337 2-A EXP SUSP
PRUDHOE BAY UNIT TERM C DEV SUSP
STATUS
DATE SECT TWP RNG MER
4/28/69 31 11N 016E U
12/20/69 33 12~ 013E U
6/17/72 17 01N 020E U
6/22/71 21 11N 013E U
4/28/76 04 11N 016E U
4/30/76 26 12N 015E U
3/30/77 26 12N 015E U
3/23/77 35 12N 016E U
3/22/78 35 12N 016E U
12/27/77 10 11N 016E U
4/25/79 03 11N 012E U
PAGE I
STATE OF ALASKA ADL 34630
ALASK'-A-OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension ~ Change approved program ~--Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other []
2. Name of Operator
3. Address
P, O, Box 1966'12. An~horacre_. A'la.~k~ clclKlCl-6fil2
4. Location of well at surface
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, 'OM
At top of productive interval
At effective depth
At total depth
1461' N, 4003' E from surface location
5. Datum elevation (DF or KB)
~-U-n it-o r- I~ r'o~ rty' ~T'n-e
P¥~11~'~'hh~ RR~' TT'n { t-
7. Well number
SAG DELTA #5 (36-12-15)
8. Permit number
80-129
9. APl number
50-029-20527
10. Pool
W~ldcat (Exploration)
feet
11. Present well condition summary
Total depth: measured
true vertical
Effective depth: measUred
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Length
Liner
11063
9779
2560
2560
Size
20"
13-3/8"
9-5/8"',
feet?'' S~l~~a{~r~9700', Cement w/60 cu. ft.
feet cement 10700'-10413'. 7" EZ
Drill at 10095'. Cement w/60 cu. ft. cement
feet10095'-9808'. Set cement plug 9080'-8897' w/60
feetcu, ft. cement. 9-5/8" EZ Drill at 8800'. Set
cement plug 2650'-2560' w/48 cu. ft. cement.
Cemented Measured depth' Wue Verticaldepth
12 cu.yds. Arcticset concrete 120'BKB
3488 cu.ft. Permafrost II 2728'MD
1322 cu.ft. Class G; 9520'MD
130 cu.ft. Permafrost C
720 cu.ft. Class G 9029'-11063'MD
Perforation depth: measured
10650'-10620', 10770'-10720',
Request extension under 20 AAC 25.170(~) 1,3,~,'
10260'-10230',tr1~c~0160'
Tubing (size, grade and measured depth)
None
Packers and SSSV (type and measured depth)
None
12.Attachments
Reason for extension: This suspended well is
within the Lisburne Participating Area (LPA) and is
being considered for future use as an observation
well in either the Wahoo or Alapah.
Description summary of proposal [] Detailed operations program L.J BOP sketch []
13. Estimated date for commencing operation
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~..~, ~ Title Division Drillin~ Enaineer
-
Commission Use Only
Conditions of approval
Notify commission so representative may witness I Approval
[] Plug integrity [] BOP Test [] Location clearanceI
No.
ORI G:.~iI,~L StG#ED
~pproved by mw
10-403 Re~1t'~2-{'-%~5
Approved
Commissioner
by order of
the commission Date ~
Submit in triplicate
:.
STATE OF ALASKA ,,.-~ ADL 34630
ALASK,, DIL AND GAS CONSERVATION COMM.~JlON
APPLICATION FOR SUNDRY APPROVALS
t. Type of Request: Abandon ~ Suspend,.._Jr-' Operation Shutdown .I i Re-enter suspended well E] Alter casing FJ
Time extension ,.~ Change approved program rZ'] Plugging E3 Stimulate !: Pull tubing ~ Amend order FJ Perforate [] Other
2. Name of Operator
Standard Alaska Production' Company
3. Address
P. O. Box 196612, Anchora§e, Alaska
99519-6612
4. Location of well at surface
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UM
5. Datum elevation (DF or KB)
KBE = 39,32' AMSL
6. Unit or Property name
Prudhoe Bay Uni t
7S~/~II Dr~b~r #5 (36-12-15)
At top of productive interval
At effective depth
A~ll'd~°,th4003' E from surface location
8. Permit number
80-129
9~¢ P._10~.~-~)r527
l°~°¢Jcat (Exploration)
feet
11. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11063
9779
2560
2560
Casing Length Size
Structural
20"
Conductor
Surface 13-3/8"
Intermediate 9-5/8"
Production 7"
Liner
Perforation depth: measured
10650'-10620' 107701-10720'
10260'-10230', tr]eL6)~/~i~c-a] 01 60'
7" EZ Drill at 10700'. Cement wi60 cu. ft.
feet Plugs (measureo) cement 10700'-10413'7" EZ
feet '
Drill at 10095'. Cement w/60 cu. ft. cement
feet 10095'-9808'. Set cement plug 9080'-8897' w/6(
feet cu. ft. cement. 9-5/8" EZ Drill at 8800'. Sei
cement plug 2650'-2560' w/48 cu. ft. cement.
Cemented Measured depth True Vertical depth
12 cu.yds. Arcticset concrete 120'BKB
3488 cu.ft. Permafrost II 2728'MD
1322 cu.ft. Class G; 9520'MD
130 cu.ft. Permafrost C
720 cu.ft. Class G 9029'-11063'MD
Request extension under 20 AAC 25.170(b) 1,2,3,4
Tubing (size, grade and measured depth)
None
Packers and SSSV (type and measured depth)
Nr)n~.
12.Attachments · Description summary of proposal ~ Detailed operations program []
13. Estimated date for commencing operation k ~. i ~ E U
Reason for extension' This suspended well is
within the Lisburne Participating Area (LPA) and i
being considered for future use as an observation
well in either the Wahoo or Alapah.
BOP sketch
14. If proposal was verbally approved
1986
Name of approver '.Alask8 0it & G3s C0~o. ,,u,,,n:ssi01~ate approved
15. I hereby certify that the foregoing is true and correct to the b~l~'h~f'3r~' knowledge
Signed (~IF'~ ~, 5, ~ Title Division Drilling Engineer
Commission Use Only
COnditions of approval Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test F_3 Location clearance
I
~3~3roved Co'p'/
Form 10-403 Rev 12-1-85
Commissioner
Date //~/
the commission Dat
.... cai
July 31, 1986
-Telecopy No.
(907) 276-7542
Mr. R. S. Allan
Standard Alaska Production Company
P. O. Box 6612
Anchorage, AK 99502-0612
Re: Extension of Suspended Status
PBU MP 11-33-11-12 No. 1-
PBU MP 22-31-11-13 No. 2
PBU MP 32-30-11-13 No. 1
PBU M~PC Tract 3-10-12
PBU ~ 43-31-11-13
Put River BP 33-12-13
PBU Chevron Tract 23-18-11-12
Sag Delta No. 3
~ D e~ a ~o,~-~ ~ !
Sag Delta No. ?
Sag Delta No. 8
Sag Delta 34633 No. 4
West Sak 25519 No. 17
West Sak' 25523 No. 16
West Sak 25655 No. 14
PBU U-13
West Sak 25548 No. 11
West Sak 25645 No. 9
Sag Delta 33-12-16 No. 1
Dear Mr. Allan:
A review of our records shows that the above referenced wells are
suspended.
Section ll0(a) of the regulations states the Commission will, in
its discretion, approve the suspension of a well if the well is
capable of producing hydrocarbons in paying quantities or is
reasonably demonstrated to have future value as a service well.
Section 105(e) states that "[e]ach well to be abandoned or
suspended must be plugged...to prevent the movement of fluid
either into or between freshwater and hydrocarbon sources and to
~prevent all other fluid migration within the well bore."
In compliance with Section 170(a) of the regulations, "It]he
location of an abandoned well onshore or upon a historically
stable island must be cleared within one year following well
abandonment .... " Section 170(b) provides the means for an
extension of time if a valid reason exists, and the well bore is
properly plugged.
Hr. R. ~. All~n
July 31 1986
Page 2
We are, therefore, requesting you to submit Form 10-403,
Application for Sundry Approval, with a program which will bring
the status of these wells.into compliance with the new
reEulations and provide a schedule for this summer when our field
inspectors can accompany your.representatives to the well sites
for location clearance inspection.
Please call Harold J. Hedlund at (907) 279-1433 if you have any
ques tions.
Sincerely,
Lonnie C. Smith
Commiss ioner
jo/A.HJH.06/07 ~.
SOHIO ALASKA PETROLEUM COMPANY
,,!
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
July 22, 1985
Mr. C.V. Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine.Drive
Anchorage, AK 99501
RE' 1985 LOCATION INSPECTION
Dear Mr. Chatterton-
In compliance with State Regulation 20 AAC 25.170, attached are
Fores 10-403, Sundry Notices and Reports on Wells, for the following
wells. These notices request that the wells remain in suspended
status.
BP' 41-33-12-1 3
BP 22-33-11-13
Term Well B (22-20-11-13)
Tern Wel 1 C (34-03-11-12)
Chevron Tract Well (23-18-11-12)
MPC Tract Wel 1 (21-03-10-12)
PBU MP 43-31-11-13
MPC 11 - 33-11-12
Getty State #1 (02-10-13)
MP Tract Well (32-30-11-13)
PBU MP (22-31-11-13) No. 2
West Sak 25645 #9
West Sak 25548 #11
West Sak 25655 #14
West Sak #16
West Sak #17
Kuparuk State 22-11-12
Sag Delta #1 (33-12-16)
Sag Delta #2A (10-11-16)
Sag Delta #3 (35-12-16)
Sag Delta 34633 #4
Sag Delta #5 (36-12-15)
Sag Delta #7
Sag Delta #8
Sag Delta #9
Sag Delta #10
Ni akuk #lA (26-12-1 5)
Niakuk #2A (23-12-15)
Alaska Island #1
Ni akuk #4
Ni akuk #5
EECEiVED
JU~ 2 '~:
A!~ska Oil & Gas Cons. Cor;lmission
Anchorage
Mr. C.V. Chatterton
July 22, 1985
Page 2
Sag Delta #11 is now ready for final inspection of the abandoned
well.
Please.advise the undersigned which day during the week of August
19-23 is acceptable for your field inspector to accompany our
representative' for this annual location inspection trip.
Very truly yours,
RSA/CRM/sh
722~5:0530N
Attachments
cc' Well File #17
R.S. Allan
Acting SAPC Drilling Engineer
S¢'~F,-,~ STATE OF ALASKA ~
ALA OIL AND GAS CONSERVATION ~OMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL []
2. Name of Operator 7. Permit No.
Sohio Alaska Petrole~ Company 80-129
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 s0-029-20527
9. Unit or Lease Name
OTHER
4. Location of Well
At surface: .
2322' NSL, 727' ~ql.~, SOC. 36, T12N, R15E, ~
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
FR~. = 39.32 ' A~tqT, I ADT-- 34630
12.
10. Well Number
Sag Delta #5 (36-12-15)
11. Field and Pool
Wildcat
(Exploration)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: Re~_est extension under SUBSEQUENT REPORT OF:
(Submit in Triplicate) 20 AAC 25.170 (]3) 1,2,3 (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Reason for extension: This site is being considered for future Exploration and/or
development.
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
The space below for Commission use Ro H. ~E~iley
Date
Conditions of Approval, if any:
Approved by COMMISSIONER the Commission
~pproved Copy
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
July 10, 1984
Mr. C. V. Chatterton
Alaska Oil & Gas Conservation Co~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: 1984 IDCATION INSPECTION
Dear Mr. Chatterton:
In compliance with State Regulation 20 AAC 25.170, attached are
Forms 10-403, Sundry Notices and Reports on Wells, for the follc~ing
wells. These notices" request that the Wells remain in suspended
status o
BP 41-33-12-13
BP 22-33-11-13
Term Well B (22-20-11-13)
Term Well C (34-03-11-12)
Chevron Tract Well (23'18-11-12)
MPC Tract Well (21-03-10-12)
PBU MP 43-31-11-13
MPC 11-33-11-12
Getty State #1 (02-10-13)
MP Tract Well (32-30-11-13)
PBU MP 22-31-11-13) No. 2
West Sak 25645 #9
West Sak 25548 #11
West Sak 25655 #14
West Sak #16
West Sak #17
Kuparuk State 22-11-12
Sag Delta #1 (33-12-16)
Sag Delta #2A (10-11-16)
Sag Delta #3. (35-12-16)
Sag Delta 34633 #4
Sag Delta #5 (36-12-15)
sag Delta #7
Sag Delta #8
Sag Delta #9
Sag Delta #10
Niakuk #lA (26-12-15)
Niakuk #2A (23-12-15)
Alaska Island #1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION, COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1, DRILLING WELL [] COMPLETED WELL []
2, Name of Operator 7, Permit No,
Sohio Alaska Petrole~a ~y 80-129
3. Address 8. APl Number
POuch 6-612, Anchorage, Alaska 99502 s0-029-20527
4. Location of Well 9. Unit or Lease Name
At surface:
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
~ = 39.32' AM~T.
I6. Lease Designation and Serial N~q~
3nT. 34630 //
10. Well Number
Sag Delta %5 (36-12-15)
11. Field and Pool
Wildcat
(Exploration)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO.: Request extension under SUBSEQUENT REPORT OF:
(Submit in Triplicate) 20 RRC 25.170 (b) 1,2,3 (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other {~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Reascm for extension: This site is being considered for future Exploration and/or
develoim~nt.
RECEIVED
J U L 1 0 19~4
Alaska 0il & G~s Cons. Commission
Anchorage
Signed ~ "" ~'"~- ~3 ~-~--'~'----~--% Title District Drilling Engineer
The space below for Commission use Re He Reiley\
Conditions of Approval, if any: Approved Cop'~
t~eturnedL
~,~ ~ Suspended status is extended until September, 1985.~O ,-~", '~'Y~
Ao. ro.d by COMM,SS,ONE. ,h. Comm,.,on O.t. J ~' .-'~-
Form 10-403
Rev. 7-1
Submit "Intentions" in Triplicate
and "Subsequent Rel3orts" in Duplicate
MEMORANDUM State of Alaska
ALASKA OIL ~ CAS CC~S~VATION CO[,~MISSIC~
TO: C.V. Ch att~~- SATE: August 25, 1983
chairman
FILE NO: 10 8A: F 2
Co~is~io~sr TELEPHONE NO:
FROM: ~8~ar W. Si~le ~ Jr~~' SUBJECT:
~troleum Ins~ctor
Inspection on Sohio's
SusF~nded LoCation
Listed Below.
~onday, August 8¢ 1983: I traveled this date to Prudhoe .Bay,.
~here i met'~ ~.[ike Dinger, Sohio's 're[~resentative, to look at the
suspended locations listed below:
Sag Delta #1 (33-12-16)
Sag Delta ~2A (10-11-16)
Sag Delta ~3 (35-12-16)
Sag Delta #34633 ~4
Sa~ Delta ~5 (36-12-15)
Sag Delta ¢7
Sag Delta ~8
Sag Delta #9
Sag Delta ~10
Attached to this report are pictures of the well head, drilling
pads, reserve pits and a copy of the AOCCC surface susL~nsion
location report.
It is my recom,~endation to the Comr, iission to approve the loca-
tions listed below:
Sag Delta ~1 Sag Delta #4
Sag Delta #2A Sag Delta ~5
Sag Delta ~3 Sag Eelta ¢8
It is my reccm'~mendation nct to approve .the following ¥;ells until
the remaining work be done to be acce~ted:
Sag Delta #7 - Electrical Cable - re[:oved
Sag Delta ~9 - Loose Eoards - picked up
Sag Delta ~1.0 - Remove Timbers
Attachments
Suspended Well and Location Report
20 AAC 25, ARTICLE 2
FILE INFORMATION:
--Operator '~ ~0 ~ ~ _ " Date Suspended
Address ~~ ~- ~ ~. ~m2~~~ ~ W~ .... '
Surface L6cati6n. Of Well - ' ' '' Permit No. ~-
~J2 Ft.. F~L, Z~V Ft. F~~L API No.
Sec.-~, T/J ~, R~ ~ ,~ ~M. Unit or Lease Name
' Wel 1 Nq.~
Field & Pool
Condition of Pad_
Condition of Pits
Well head - Ail outlets plugged
Yes No
Well sign - Attached to well head Yes No
Attached to well_~d ~ No
Attached to
Info rmati on .corre ct
No
Cellar - Opened Yes
Fi llaj ' Ye s
WaterWell - Plugged off
Photographs taken to verify above
capped
No Rat Hole Open Yes No
No Fi 1 le.d Ye s No
NO Cove r e'd.'> ~ "~'~'?~
~Lye ~ No
Open Explanation
conditions Yes No Explanaton
Work to be done to be acceptable
This well and
suspended for the period
of 19
_
Inspected by :_~~~~
Date':_ &} ~..$
location is (acceptable) (~e) to be .classified as
thru 19 .
R d 8~24/82
SOHIO ALASKA PETROLEUM COMPANY
31 I 1 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO: Bill Van Alert' July 22, 19'83
Oil. & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, Alaska. 99501
REFERENCE: Sohio Sag .'Delta 95
~owing material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Enclosed are core 'desCriptions for Cores' 91, .96, 197, 98, 910, & 911.
Our apologies for overlooking this the .first time.
Kar~' T..HendricksOn
Exploration
RECEIVED
DATE
wu...m~$o{013
Naska Oii& Sas $6~s. ~-~."~ ' ~'
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
July 21, 1983
Mr. C. V. Chatterton
Alaska Oil & Gas Conservation Commission
3001 Por~pine Drive
Anchorage, Alaska 99501
1983 'IOC3%TION INSPECTION
Dear Mr. Chatterton:
In compliance with State Regulation 20 AAC 25.170, attached are
Forms 10-403, Sundry Notices and RePOrts on Wells, for the following
wells. These notices request that the wells remain in suspended
status.
Sag
Sag
Sag
~sag
Sag
Sag
Sag
BP 41-33-12-13
BP 22-33-11-13
Term Well B (22-20-11-13)
Term Well C (34-03-11-12)
Chevron Tract Well (23-18-11-12)
.MPC Tract Well (21-03-10-12)
PBU MP 43-31-11-13
_MPC 11-33-11-12
Getty State #1 (02-10-13)
MP Tract Well (32-30-11-13)
PBU MP 22-31-11-13, No. 2
West Sak 25645 #9
West Sak 25548 #11
West Sak 25655 #14
West Sak #16
West Sak #17
Kuparuk State 22-11-12
Sag Delta ~1 (33-12-16)
Delta #2A (10-11-16)
Delta #3 (35-!2-16)
Delta 34633 ~4
~Ita ~57 (36-12-15)
Delta #7
Delta #8
Delta #9
Sag Delta #10 ~.~.
Niakuk #lA (26-12-15)
Niakuk #2A (23-12-15)
Alaska Island ~1
Mr. C. V. Chatterton
July 21, 1983
Page Two
Water Injection Well GC - lB (13-11-13) is also now ready for final
inspection of the abandoned well site.
Please advise the undersigned which day during the week of August 8th
is acceptable for your field inspector to accompany our representative
for this annual location inspection trip to the above-named well sites.
Very truly yours,
R. H. Reiley
District Drilling Engineer
encs
cc: Well Files #17
~ STATE OF ALASKA ~
ALAsK~ OIL AND GAS CONSERVATION (.,OMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum ~y 80-129
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20527
9. Unit or Lease Name
OTHER~
4. Location of Well
At surface:
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
~RV. = 39.32' AMSL
6. Lease Designation and Serial No.
ADL 34630
10. Well Number
Sag Delta #5 (36-12-15)
11. Field and Pool
Wildcat
(Exploration)
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: Request extension under SUBSEQUENT REPORT OF:
(Submit in Triplicate) 20 AAC 25.170 (]3) 1,2,3 (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Reason for extension: This site is being considered for future Endicott Reservoir
development.
Approved Copy
Returned
RECEIVED
J U L 2: ~ 1983
Alaska 0il & Gas Cons, C0mmissi0.r
Anch0ra.§o
14. I hereby certify that the foregoing is true and c~rrect to the best of my knowledge.
The space below for Commission use .r~.o ~o
Date
Conditions of Approval, if any: This location vms inspected by our representative on August 8, 1983
and clean up was found satisfactory for a suspended location. A subsequent inspection
will be necessary by August 1984.
ORIGINAL sI'GliEB
By Order of
Approved by BY [~!~- ~, S~!T,~, COMMISSIONER the Commission Date__
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
MEMOF3. .NDUM S te of
ALASKA OIL AND GAS CONSERVATION COMMISSION
TO:c o V~J~erton
Chai~~- .
Thru: Lonnie C. Smith
Commissioner
Doug Amos
FROM:
Petroleum Inspector
DATE: November
FILE NO: 10 8/A
TELEPHONE NO:
Alaska
9, 1982
SUBJECT: Inspection of Sohio' s
Suspended Locations
Listed Below
_F_ri_day, August 27, 198_2 - I traveled this date to Prudhoe
Bay where I met Jerry Segar, Sohio representative, and
conducted the second clean-up inspection on the locations
listed below.
Attached to this report are pictures of well heads, reserve
pits, drilling pads and a copy of the Form 10-403.
I recOmmend to the commission that the following locations
be accepted in .regard to location clean-up, well sign
placement, and pit condition.
PBU MP 22-31-11-13 No. 2
Term Well ~ (22-20-11-13)
Term Well C (34-03-11-12)
MPC Tract Well 21-03-10-12
MPC 11-33-11-12
Getty 'State No. 1, (2-10-13)
PBU MP 43-31-11-13
West Sak 25645 #9 (3-11-9)
West Sak 25548 #11 (.36-12-8.)
West Sak 25655 #14
West Sak #16 (31-36-13-08)
West Sak #17 (44-26-13-09)
Kuparuk State 2 2-11-12
Sag Delta #5 (36-12-15)
Sag Delta #1 (33-12-16)
Sag Delta #2A (10-11-16) " "
Sag Delta #3 (35-12-16) " "
Sag Delta .#4 (34633) " "
Sag Delta #7 " "
Sag Delta #8 " "
Sag Delta #9 ,- " "
Sag Delta #10 " ".
MP Tract Well 32-30-11-13" "
Niakuk #ia (26-12-15)
Niakuk #2A (23-12-15)
Chevron Tract Well (23-18-11-12)
No pictures, ran out of film
II II lB II
Il II II Il
II II II II
II Il Il II
I1 II II II
II II II II
II II I! II
II II II II
In summary, I inspected the above listed suspended locations
for clean-up, well signs, and Pit conditions.
02-001 A(Rev.10/79)
Sus~ /ed Well and Location Rep¢'~
20'AAc 25, ARTICLE 2
FILE
INFORMATION:
Operator
Addre s s
Date Suspended
Surface Location of Well Permit No.
'77-? rt. L No.
~3ZZ Ft. ~ L, aPI 50
'~Sec.~, T /Z ~ R~~' ~M. ~Unit or Lease Name ~/~ .
- ' Well No. ~' ~/~
Condition of Pits
Well head - Ail outlets plugged
Wel 1
sign - Attached to well head·
Attached to well guard
Attached to
Information correct
Yes
No
No
Cellar - Rat Hole
Opened
Filled
Covered
WaterWell - Plugged off
Yes ~.
~ No.
~ No
~ Open
Exp la na ti on
Open
Fi 1 led
Covered
Yes ~
c~ No
No
Photographs taken to verify above conditions ~ No
Expla naton
Work to be done to be acceptable
This well and location is (_a_o-~.n~--~b_]~-_~_ (unacceptabl~_ to be
suspended for the period of
Ins~cted by:_. _ ~~~' ~~ -~ '
Da te.:~ ~-Z
classified as
19~.
Revised 8~24/82
SOHI° ALASKA PETROLEUM COMPANY
3111 '°C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
July' 30, 1982
Mr. C. V. Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
In compliance with State Regalation 20 AAC 25.170, attached are
Forms 10-403, Sundry NOtices and Reports on Wells,. for the following
wells. These notices request that the wells remain in suspended
status o
BP 41-33-12-13
BP 22-33-11-13
Term Well B (22-20-11-13)
Term Well C (34-03-11-12)
Chevron Tract Well. (23-18-11-12)
MPC Tract Well (21-03-10-12)
PBU MP 43-31-11-13
MPC 11-33-11-12
Getty State #1 (02-10-13)
MP Tract Well (32-30-11-13)
PBU MP 22-31-11-13, No. 2
West Sak 25645 #9
West Sak 25548 #11
West Sak 25655 #14
West Sak #16
West Sak #17
Kuparuk State 22-11-12
Sag Delta #1 (33-12-16)
Sag Delta #2A (10-11-16)
Sag Delta #3 (35-12-16)
Sa9- Delta 34633 #4
Sag ~Delta~ #5- (36-12-15)
Sag Delta #7
Sag Delta #8
Sag Delta ~9
Sag Delta #10
Niakuk #lA (26-12i-15)
Niakuk #2A (23-12-15)
Alaska Island #1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL r-I
COMPLETED WELL []
OTHER[DC
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 80-129
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20527
9. Unit or Lease Name
4. Location of Well
At surface:
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 39.32' AMSL
6. Lease Designation and Serial No.
ADL 34630
10, Well Number
Sag Delta %5 (36-12-15)
11. Field and Pool
Wildcat
(Exploration)
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: Request extension under SUBSEQUENT REPORT OF:
(Submit in Triplicate) 20 AAC 25.170 (b) 1,2,3 (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing I-]
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other I~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Pmason for extension: This site is being considered for future Sag Delta development
Clean-up to date: a) Major structures have been removed.
b) Loose debris has been removed.
RECE VEI)
AUG - 1982
I Approved Co.y
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ Title District Drilling Engineer
The s0ace belo ley
Alaska Oil & Gas Cons. C0mmissi0r~
Anchorage
o,,. 7 '3o. Z_
Conditions of Approval, if any: This location was inspected by our representative on August 27, 1982
and clean up was found to be satisfactory for a suspended loctioan. A subsequent inspec-
tion will be necessary by August 1983.
DRiGJf~A! St~;~LD By Order Of
~,~,. ......... COMMISSIONER the Commission
Approved by ~,. ~,~a~aa~. u. 0t~1~
Fo,m 10-403
Submit "Intentions" tn Triplicate
GL~OOIB(Rev 10,76~
STATE ~'"'~
of ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
to: ~Hoy le H. Hami lton/f/~
Chairman
ThrU: Lonnie C. Smith J~
Commissioner
~rom: Bobby F0Ster'~-~'
Petroleum Inspector
DATE:
FILE NO.
September 11, 1981
TELEPHONE NO:
SUBJECt: Inspection of SOHIO's
Suspended Locations
Listed Below
Monday AugUst 31 Thru Wednesday ..Sep_t.e..mber 2: I traveled to
Prudhoe Bay Monday August 31, 1981 where I met with Jack Barr,
Judy Golding and Jerry Stegar, Sohio representatives and discussed
the upcoming location inspection.
Attached to this report are pictures of well heads, reserve pit,-
drilling pad, and a copy of surface, suspension report.
It is my recommendation to the commission that the following
locations be accepted in regard to location clean-up, well sign
placement, and pit condition.
Mobil Phil lips
Mobil Phil lips
Mobil Phil lips
CheVron Tract
West Sak
West Sak
West Sak West Sak
Mobil Phil lips
Mobil Phil lips
Mobil Phil lips
Term wel 1
Term wel 1
Getty State~
Ni akuk---
Niakuk
Niakuk
Niakuk
Sag Delta
sag Delta
Sag Delta
Sag Delta
Sag Delta
Sag Delta,
Sag Delta
21-03-11-12
11-33-11-12
22-11-12
23-18-11-12
#9
#11
#16
#17
22-31-11-13
43-31-11-13
32-30-11-13
B
C
#1
#lA
#2
#2A
#1
#2
#2A
#3
#4
#5
#8
In summary, I inspected the above listed suspended locations for
· clean-up, well signs, and pit' conditions.
~ 20 AAC 25, ARTICLIg 2
i
!
FILl.] INFORHATION:
Surface Loc~tioh of'Wel-i '' ' -leu,tit No. _ ~dP;- /~,~
~Ft. FN~L, 9~ Ft. ~[., AP1 No. 50- ~~.-~O~
Well No. ~ ~
Height Above Final Grade-LeVi/(4' H:[nb) ~--
Top of Marker Pipe Closed with: Ce~nent Plug Screw Cap Welds
Set: On Well Head , On Cutoff Casing , In Concrete Plug
Distance Below Final Grade Level Ft. in.
Side Outlets: All Valves and Nipples Removed
All Openings Closed ~ , With Blincts ~ , With Cement ~, Other~/~
INFORHATION I~EAI)WELI)EI) I) JRECI'ELY TO M.\RI<ER POST:
(List Where Different frotn File Information)
Operator /L//~-~ Unit or Lease
Name
Well Number ~ , Surface Location of Well:
Ft. F L, Ft., F L, Sec , T , R
, M
20 AAC 25.170: LOCATION CLEAN-UP
PITS:
Filled I~f~ Liners Removed or Buried
!
SURFACE OF PAD AND/OR LOCAT[OH:
Rough , Smooth .~-'~, Contoured , Flat
Other
, Debris Removed
Compacted ,
CLEAN UP OF PAD AhL/OR LOCATION:
Clean /'~, Pipe Scrap __, Iron Scral{
Paper , Other
, Wood , Mud , Cement
SURROUNDING AREA:
Wooded , Brush , Tundra
_
Sand , Other
, Grass , Dirt , Gravel-''~ ,
CONDITION SURROUNDING ARF. A:
Clean ..~', Trash from Site
Other
, Tree~ aqd/or Brush fro,n Clearing Site
ACCESS ROOD:
Dirt f~/i/~c, Gravel , Ice , Other
CONDITION ACCESS ROAD AND SURROUNI)IN(]:
Clean ~. Rough , Smooth , Trash'from Operations ,
Trees a~d/or Brush from. Clearing Road , Spoil from Clearing Road
Other 1----'
No
Final Inspection
SOHIO ALASi<A PETROLEUM COMPANY
311~ 'C"SfREE!
ANCHORAGE. ALASKA
TE:£EPHONE i907) 276 5tll
MAIL: POUCH.6-612
ANCHORAGE. ALASKA 99502
August 17, 1981
Mr. Lonnie Smith
Alaska Oil & Gas Conservation Cc~mission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear ~4r. Smith:
In compliance with state Regulation 20 AAC 25.170, attached are
Forms 10-403, Sundry Notices & Reports on Wells, for the follc~ing
wells. These notices request that the wells remain in suspended
status.
Term Well B (22-20-11-13)
Term Well C (34-03-11-12)
Chevron Tract Well (23-18-11-12)
MPC Tract Well (21-03-10-12)
PBU MP 43-31-11-13
MPC 11-33-11-12
Getty State #1 (02-10-13)
MP Tract Well (32-30-11-13)
PBU MP 22-31-11-13, No. 2
West Sak 25645 #9
West Sak 25548 #11
West Sak 25655 #14
West Sak #16
West Sak #17
Kuparuk State 22-11-12
Sag Delta #1 (33-12-16)
Sag Delta #2 (10-11-16)
Sag Delta #2A (10-11-16)
Sag Delta #3 (35-12.-16)
Sag Delta 34633 #4
Sag De.~ta:', # 5 ( 36~12-15) ~'~
'Sa9 Delta #7
Sa9 Delta # 8
Niakuk #1 (26-12-15)-abandoned
N~akuk #lA (26-12-15)
Niakuk #2- abandoned
Niakuk #2A (23-12-15)
Niakuk #3 (13-12-15)
RECEIVED
^!,-.zska ()ti & (.~a.$ (;un$. C;ollu'ilis$iO:l
^ncho~'afle
Mr. Lonnie Smith
August 17, 1981
Page Two
We would like to have your field inspector present scmetime during
the week of August 31 -'September 4 to accompany our representative~
for final location inspection of the follc~ing wells:
Challenge Island #1
Reindeer Island Stratigraphic Test #1
West Sak #4
.Kemik Unit #2
West Kuparuk State 3-11-11
Hurl State 5-10'13
Socal-Mobil 33-29E (29-12-11)
Kuparuk State 33-11-12
Kuparuk 9-11-12
MPC 7-11-12'
Kuparuk State 21-11-12
MPTract Well 13-15-11-12
PRJ:JLG: ja
Attachments
cc: Well Files
CC# 37,291
Yours very truly,
P. R, Judd
Manager Drilling
STATE OF ALASKA
ALASKA ("'~. AND GAS CONSERVATION C~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL []
OTHER []
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchoraqe, Alaska
4. Location of Well
At surface:
7. Permit No.
80-129
99502
8. APl Number
5o-029-20527
9. Unit or Lease Name
10. Well Number
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
sag Delta #5 (36-12-15)
11. Field and Pool
Wildcat (Exploration)
5. Elevation in feet (indicat(; KB, DF, ~t'c.) I 6. Lease Designation and Serial No.
KBE = 39.32' A~SL I ADL 34630
12. Check Appropriate Box lo Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: Request extension under SUBSEQUENT REPORT OF:
(Submit in Triplicate) 20 AAC 25.170 (b) 1,2,3
Perforate [] Alter Casing [] ~ Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [~ Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
[] Altering Casing []
[] Abandonment []
[] Other []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Reason for extension: This site is being considered for future Sag Delta development.
Clean-up to date: a) Major structures have been removed.
b) Loose debris has been removed.
RECEIVED
AUG 2 6 ]98]
Approved . op~Uaska 0il & Gas Cons. Commission
~ Returned An,ch0rage
14.1 hereb~Atifyth;tthef,~t~ng~d~J( ' ~=~ ( ~~ correct to the best of my knowledge. - - --
Signed I,I '~ - .'~ ~ ~ TitleDiStrict Drillinq ~nqineer
The space below for Com-rnission use 'R. H. -~.ley
Conditions of Approval, if any: This suspended location was inspected by our representative on
09/01/81 and the clean-up was found to be acceptable. Approval is given to leave the
well cover and sign in place. This approval is given until 09/01/82. A subsequent
inspection will be necessary by mid-summer 1982.
Approved by. 'ItlIIGIHA[ SIGNED COMMISSIONER the Commission Date __
Form 10-403 BY !.~'~[ [~. S~i~ Submit "Intentions" in Triplicate
Rev. 7-1~0 and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C'"!
ANCHORAGE
TELEPHONE (90
MAIL: POU(
ANCHORAGE, A
TO:
Juae 19
REFERENCE:
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
([) print ~ (I) sepia of t~
RECEIVED
DATE
SOHIO ALASKA PETROLEUM COMPANY
31 I 1 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
REFERENCE: ~.--~-'.-& Sag' Del~ %7
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
s~ ne.t~ #5 (sept)
Sag Delta J7 (sep:i~).
RECEIVED
DATE
Oil ~ G~s~ ~°"~S~s'/Onmmissi°n
June 5, 1981
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Alaska Oil and Gas Conservation Commission
Regulations Article 2, ABANDONMENT AND PLUGGING,
20 AAC 25.120 WELL ABANDONMENT MARKER and
20 AAC 25.170 LOCATION CLEAN UP.
Gentlemen:
This is in addition to our letter of June 4, 1981 regarding
the above subject.
The following wells were omitted from the list of suspended
wells:
Sag Delta #5
r'$~~-lta #t
Sag Delta #8
West Sak #16
Yours truly,
JKT
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO: State of Alaska
Oil and Gas Conservation ~sion
3001 Porcupine Drive
Anchorage, Ak 99501
Attn: Harry Kugler
6-5-81
REFERENCE: Sohio - Sag Delta ~5
.,~e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Being transferred to the State of Alaska are eight boxes of
core chips from Sohio's Sag Delta ~5 cores. The depths
represented are as follows:
Box 1 9815' -9893 '
Box 2 9894'-9965'
Box 3 9966' -10035'
Box 4 10036' -10107'
Box 5 10108' -10390 '
BOx 6 10391' -10446 '
Box 7 10447' -10758'
Box 8 10758'-10817'
Anne Brown
Exploration Dept.
RECEIVED'
JUN - 5 1,981
Alas~ Oil & (3a,~ Cons.
~chorage
RECEIVED
DATE
19
SOHIO ALASKA PETROLEUM COMPANY
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
June 4, 1981
CONFIDENTIAL
Mr. H. H. Hamilton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Hamilton:
Enclosed is the Sag Delta ~5 testing report you requested.
The Petroleum EngineeringDepartment conducted production tests
on five (5) exploratory wells this winter with a limited staff,
so please accept the delay in receiving this report.
If you have any questions regarding the testing or reported data,
please do not hesitate to call Rick Whitlow, Petroleum Engineer,
at 263-5563.
District Field Engineer
GJP:RRW: ja
Enclosure
Gas Cons. commission
SAG DELTA #5
WELL TESTING REPORT
CONFIDENTIAL
I. INTRODUCTION
Sag Delta $5 was drilled by VANguard Rig $3 from February 3 through
April 13, 1981 with Sohio Alaska Petroleum Company as the operator. The
well was drilled to a total depth of 11060' BKB with 520' of cores
recovered from formations of interest below 9800' BKB. The open hole
evaluation at total depth entailed a full suite of open hole logs, RFT
fluid samples and formation pressures, a seismic velocity survey, and 18
recovered sidewall cores.
A 7" 295 L-80 liner was set with the float shoe at 11063' BKB. The liner
was cemented and cleaned out to 10994' BKB.
Three intervals in the formation were perforated for production testing.
The lower interval perforated (10728' - 10748' BKB) produced water at 12
BPD until the well died due to water column back pressure. Additional
perforations were shot and the zone was acidized with no gain in
productivity. An EZ Drill bridge plug was then set above the perforations
at 10700' BKB to isolate the interval.
The second interval was perforated from 10230' - 10260' BKB and tested.
This zone was very tight and did not flow.
The last interval was shot from 10130' - 10163' BKB and, again, no flow or
pressure increase was measured.~
Testing was concluded on April 10 and the well was suspended on April 13,
1981.
II. INTERVALS PERFORATED
(2.1) Production Test
Alaska 0il & Ga~ Cons. Commission
The first interval of interest was perforated in drilling mud
Jumbo-Jet carrier guns loaded with 4 spf at 90° phasing.
Perforated Interval: 10728'-10748 ' BKB (20') (Ref. FDC/CNL/GR).
(2.2) Production Test $2 and $3
An additional 30' was shot and the interval was reperforated after the
first low productivity test. The zone was perforated using 1 11/16'.~'
Hyperdome guns loaded with 4 spf, magnetically eccentralized with 00
phasing.
Perforated Interval: 10720 '-10770 ' BKB (50') (Ref. FDC/CNL/GR).
(2.3) Production Test $4
The second interval of interest was perforated in drilling mud with 30'
of 4" Jumbo-Jet carrier guns loaded with 4 spf at 90o phasing.
Perforated Interval: 10230 '-10260 ' BKB (30 ' ) (Ref. FDC/CNL/GR).
(2.4) Production Test #5
One last interval of interest was perforated using 33' of 1 11/16"
Hyperd.cme guns loaded with 4 spf at 90° phasing. This zone was tested
along with the previously perforated interval of 10230'-10260' BKB.
Additional Perforations: 10130'-10163' BKB (33') (Ref. FDC/CNL/GR).
III. S~Y OF TESTING OPERATIONS
(3.1) Production Test #1 (4/4-6/81)
The testing assembly used is indicated in Figure 91. The drill string
was displaced to diesel prior to opening the APR valve so the well bore
would be approximately 1100 psi below reServoir pressure.
A surface readout HP pressure/temperature gauge was Set at 10710' BKB
(9433' TVDss) and recorded initial conditions of:
BHSIP @ 4452 psia
HHSIT @ 181OF
WHP @ 1050 psig
The well was opened to flow at 2000 hours, 4/5/81. The BHP dropped to
3400 psia in one minute and remained constant. A five-gallon bucket
rate check at 2120 hours indicated a rate of 26.4 BPD. This dropped to
12-BPDby 2200 hours and 11.8 BPD by 2330 hours. The bottomhole pressure
was increasing steadily during the flow period. This indicated that
the diesel in the drill string Was being replaced by formation water.
By 0130 hours, 4/6/81, the rate had dropped to 11.6 BPD and the BHP had
increased 56 psi to 3456 psia. Because of the low flow rate, we decided
to reperforate and shoot additional footage. The well was left open
during the perforating, but declined to 0 BPD by 0500 hours, 4/6/81.
(3.2) Production Test #2 (4/6/81)
The additional perforating was completed by 1100 hours, 4/6/81 with no
flow or WHP. A very low 'flow started at 1300 hours and increaSed to 12
BPD by 1500 hours. The HP pressure/temperature gauge was run in the
hole and set at 10710' BKB (9433' TVDss).
The well was shut in for a pressure buildup at 1515 hours, 4/6/81. The
well conditions 'prior to shut in were:
FBHFP @ 3526 psia
FBHFT @ 181OF
FWHFP @ 0 psig
The well was shut in 'until 1808 hours, 4/6/81. A short time PBU, Horner
Analysis indicates a permeability of approximately .1 md.
JUN
Alaska Oil & Gas Cons, Co ~m~ssion
Anchorage
(3.3) Hydrochloric Acid Stimulation (4/6-7/81)
Dowell was rigged up by 2200 hours to pump 120 bbls. (5000 gals. ) of
15% HC1. Injection lines were pressure tested to 4500 psi and pumping
started at 2320 hours. The 15% HC1 acid was circulated into the well
using the circulating valve at 10575' BKB. When the acid reached this
depth, the circulating valve was closed and the 120 bbls. of acid was
pumped away into the formation with an initial surface pressure of 3400
psi and rate of 2 BPM. The pump pressure required for a 2 BPM injection
rate steadily decreased through the job as the acid penetrated t/he
formation. It dropped to a minimum of 2000 psi during the job. The
acid was displaced at 0120 hours, 4/7/81. Dowell was rigged down and
the flow line rigged up by 0400 hours.
(3.4) Production Test #3 (4/7/81)
The well was opened to flow on a 1/4" choke at 0415 hours; WHP prior to
opening was 1625 psig. The flowing WHP dropped to 550 psig by 0430
hours, 300 psi by 0445 hours, 150 psi by 0500 hours, 10 psi by 0530
hours, and 0 psi by 0630 hours. During this period the well flowed a
total of 106 bbls. so the reservoir fluid did not reach surface. Production
dropped to 0 BPD at 0700 hours, and the test was concluded at 0900
hours. The tubing volume was reversed to tanks but all formation fluid
samples were contaminated. No bottomhole pressureSwere obtained during
this flow period because of the previous acid job.
(3.5) Production Test #4 (4/9/81)
After Production Test #3, the drill pipe and dc~T~hole testing assembly
were pulled and a 7" EZ Drill bridge plug was set at 10700' BKB. The
next zone was shot and the drill pipe testing assembly was run back in
the hole.
An HP pressure/temperature recorder was set at 10210' BKB (9041' TVDss)
and recorded the following before the well was opened.
FBHCIP @ 4216.4 psia
FBHCIT @ 173°F
FWHCIP @ 900 psig
The well was opened to flow on a 1/4" choke at 1400 hours, 4/9/81. WHP
fell to 200 psi by 1401 hours, 10 psi by 1402 hours, and stopped flowing
by 1405 hours. The well was observed until 1800 hours; at this time
the HP was pulled and the next zone perforated.
(3.6) Production Test ~5 (4/10/81)
The next interval of interest (10130'-10163' BKB) was shot and no pressure
increase or flow was recorded. The well was observed for 2 hours with
no change.
The testing of Sag Delta 95 was concluded at 0400 hours on 4/10/81. The
well was reversed out but uncontaminated formation fluids werewolf% ~~~
when fluids fr~m T.D. reached surface.
Oil & GaR Cons, Commission
Anchorage
IV.
TABLE OF FIDW TEST RESULTS
Final Final Final
Test No. BHFP BHSIP BNSIT
psia psia OF
1 3456 4452 181
2 3526 3961 181
4 3313 4216 173
Final
Choke
in.
· 125
.125
.25
.25
.25
Q water
Avg._
BPD
12 & fell to 0
12
864 & fell to 0
.JUN - ~ ic~''
Alaska Oil & ~as Cons. Commission
Anchorage
FIGURE #1
SAG DELTA #5 TEST ASSt~4BLY
X-over to Lubricator
Halliburton wrap-a-'round
Manifold & Master Valve
2 1/2" ID Kelly Cock
Flowl ine
2 1/2" ID Kelly Cock
-? - 13 3/8" Casing
5" 19.5#/ft. Drillpipe
3 1/2" x 5" X-over
3 1/2" 13.3#/ft. DP
9 5/8" Casing Shoe
@ 9522' BKB
Upper Circulating Valve
APR Ball Valve
Shear Pin Reversing Sub
RITSCirculating Valve
7" RUINS: ~
Set @ 10605' BKB (P.T. 91,2&3)
Set @ 10050' BKB (P.T. #4 & 5)
PBTD @ 10994'
3 1/2" Tailpipe (1 30'jt.~
Perforated interval
· JUN 5 I981
J 1 A1ask~ Oil & Gas Cons. Commission
J
,.= ~ Anchorage
--- .? . 7" 29#/ft. Liner Shoe
i- .... - = T.D. of 11063' BKB
May 15, 1981
Mr. R. ~. Re iley
Distriut Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612 ~--
Anchorage, Alaska 99502
Dear Mr. Reiley:
We recently received the completion report and other data that
you filed on your ~5 ~(36-12-15) well The formation
test information~'711~tedas~m number 30 on [he completion
report (Form 10-407}, was not incluaed. We would like this in-
formation submitted in the near future.
Sincerely,
~oy14 H. Hami 1ton
Chairman
SOHIO ALASKA PETROLEUM COMPANY
3111 '°C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
May 13, 1981
Alaska Oil & Gas Conservation Co~m~ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Saq Delta #5 (36-12-15)
Enclosed, in duplicate, is Form 10-407, Completion Report, for
the above-named well together with the Well History, Well Logs,
Directional Surveys, and Core Data Sheet.
This well has been suspended.
RHR:ja
Enclosures
cc: Well File ~17
Yours very truly,
District Drilling Engineer
MAY 1
Alaska Oil & Gas GoDs. CoD]miss/oD
ADchomD~
STATE OF ALASKA "~ ' ~
ALASKA~ND GAS CONSERVATION~SSION
WELL COMPLETION OR RECOMPLETION PORT AND LOG
1. Status of Well . ~CO NFl~f~~
OIL:~] GAS [] SUSPENDED [] ABANDONED [] SERVICE·
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum Company 80-129
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20527
4. Location of well at surface 9. Unit or Lease Name
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
At Top Producing Interval 10. Well Number
1447'N 3773'E from surface location Saa r~_l fa ~
~, ., ,. - ·
At Total Depth 11. Field and Pool
1461'N, 4003'E from surface location ~/?~¢'/zz~ ~?~'Z'~J~ Wildcat (exploration)
5. Elevation in feet (indicate KS, DF, etc.) I 6. Lease Designation and Serial N~o.
KBE = 39.32' AMSLI ADL 34630
12. Date Spudded2/3/81 13. Date T.D. Reached3/25/81 14. Date Comp., Susp. or4/13/81 Aband. J 15. Water Depth; if offshorefeet MSL I16' N°' °f C°mpleti'°ns·
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. DirectionalSurvey I~o.~t~roSSSVs~
11063 'MD 9779 'TVD 2560 'MD&TVD YES [] NO [] none feet MD Discontinuous
22. Type Electric or Other Logs Run
DIL/BHCS/GR/SP/T]~I, FDC/~/SP/~, CBL, ML/PL/CAL, HIlT, RFT, Velocity Survey, CBL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLESIZ'E CEMENTING RECORD AMOUNT PULLED
20" 94# H-40 Surface 120'BKB 26" 12 ~u.yds. Ar~_f~_.q~f
13 3/8" 72# L-80 Surface 2728' 17 1/2" 3488 cu.ft. Permafrost II
9 '5/8" 47# L-80 Surface 9520' .. 12, 1/4" 1322 cu.ft. Class G;
130 cu.ft. Permafrost C
7" 29# L-80 9029' 11063' 8 1/2" 720 cu.ft. Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
in~erval, size and number) . . SIZE DEPTH SET (MD) PACKER SET (MD)
None
,.
None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
. : DEPTH INTERVAL (MD.) AMOUNT &. KIND OF MATERIAL USED
...
See Well hiStory attached ·
.
, ,
27. pRODUCTION TEST
Date F, irs.t production Method of Operation (.Flowing, gas lift, etc.) ... ,
.
Flowing (see test ..summary)
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAs-OIL RATIO
TEST PERIOD ~ . . ..
Press.~FI°w Tubing, Casing Pressure· 24-HouRCALCULATED1 RATE" '--~ el L-BBL.. · GAS:M'CF ~ .WATER-DB L. OIL GRAVITY-API~. ~ ~,~(c°rr)',7'" ~ ~ ,? .~'~ .
28. ' ' ; CORE DATA i~ ~ ~ ~
·
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core'chips."
-- ,, - - ' " MAY 1 1 31
See attached Core Data sheet
.. · · - - · -. ' Ai~s-ka 0il a Gas Cons. (;0mmissi0n
.... . .. .. Anchora§~
.... CO ;IDENTIAL
, .
; .
~;ey
Form 10-407 .,.Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE '.;.-.~i,i'~ "'
· ,.- · ., sa'~ <~57 ;' :'~ ~: ':,'. "·~: :': : -.;.'- ", .. · -' ':. L'::-:~:. ,
', .- ~---¢'""'"~r--~%' ,' . ' . .' --.~.~._ , . ....
:' ' -- - ' '" ' ~,'"'"' ";q'* ..... , :30/>, " · ,, .-~*, .,,.'.~ ....
29. ;...~ :'..', . . . ~... . ¢":" . ..... _. .
-" GEOLOGIC MARKERs /" "' -:'::';' ':' "' '" '' "' ': . FORMATION TESTS '
· f NAME
..- ; . Include interval tested, pressure data, all fluids recovered and gravity,
. MEAS. DEPTH TRUE VERT. DEPTH 'GOR, and time of each phase.
Lisburne Group 9837 ' " -8720 ' See test sunm]ary
·
.
. .
..
31. LIST OF ATTACHMENTS
Well History, Well Logs, Directional Surveys, Core Data Sheet
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
·
~"'~glned ~ TitleDistrict Drilling Date ~"- ' ] - ''
R Enqinccr .
INSTRUCTIONS
General' This form-is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
· Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
..:
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion)', so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
CO fiDL JT AL
WELL SAG DELTA # 5
WET.L HISTORY
Spudded well at 1200 hours, February 3, 1981. Drilled 17 1/2" hole to 2700', ran
open hole logs. Ran 68 j ts. 13 3/8" 72# L-80 Buttress casing to 2728'. Cemented
with 3488 cu,ft. Permafrost II cement. Installed and tested BOPE. Cleaned out
to 2674', tested casing to 3000 psi, okay. Drilled out to 2750', ran leak-off
test to 0.66 psi/ft, gradient. Directionally drilled 12 1/4" hole to 9242', ran
open hole logs. Drilled to 9537', ran open hole logs and obtained sidewall core
samples. Ran 248 jts. 9 5/8" 47# L-80 Buttress casing to 9520'. Cemented in two
stages: First stage with 1322 cu.ft. Class G cement; second stage through D.V.
packer at 2600' with 130 cu. ft. Permafrost C cement preceded by Arctic pack.
Cleaned out to 9500', .tested casing tO 3000 psi, okay. Drilled out to 9550',
performed formation competency test to 0.7 psi/ft, gradient. Directionally
drilled 8 1/2" hole to 9815'. Cut 14 cores from 9815' to 10819', cut 614 1/2',
recovered 512 1/2'. Drilled to 11063' TD/MD. Ran open hole logs and HDT and
RPT. Obtained sidewall core samples. Ran velocity survey. Ran 51 jts. 7" 29#
L-80 Buttress liner to 11063'. Cemented with 720 cu. ft. Class G cement. Tested
BOPE to 3000 psi, okay. Cleaned out to 11010' tested liner to 3000 psi, okay
Ran CBL and gyroscopic survey.
Production tested well through drillpipe with packer at 10605'. Perforated
intervals 10650'-10620' and 10770'-10720'. Acidized and retested same inter-
vals. POH with test tools. Set EZ Drill retainer at 10700'. Production tested
through drillpipe with packer at 10095'. Perforated intervals 10260'-10230'
and 10170 '-10160'. Suspended test.
Set first cement plug consisting of 60 cu. ft. Class G with 18% salt from 10700'
to 10413'. Set retainer at 10095' and cemented with 60 cu.ft.. Class G with 18%
salt from 10095' to 9808'. CIP at 0600 hours, April 11, 1981. Set balanced
cement plug consisting of 60 cu. ft. Class G with 18% salt from 9080' to 8897'.
CIP at 0945 hours, April 11, 1981. Set EZ Drill retainer at 8800'. .Displaced
top 2560' of hole to CaC12. Set 48 cu. ft. Class G cement plug from 2650' to
2560'. Tagged top of cement plug at 2560'. Filled top 100' of hole with diesel.
Nippled down BOP's. Installed 13 5/8" 5000 psi x 4" 5000 psi adapter on top of
tubing spool. Installed 4" 5000 psi valve plus blind flange on top of adapter.
Suspension witnessed and approved by Doug Amos of AOGC~.
Drained cellar, installed well protective cap and well sign. Released rig at
2100 hours, April 13, 1981.
CONFIDENTI
MAY 1
Oil & Ga'; Cor~. Commission
SPERRY-SUN WELL SURVEYING COMPANY'.
ANCHORAGE, ALASKA ·
. .
__.S.O_I-L[O ~_A. LAS KA' P I~_ T R,O.L E U-Et-c_o.E.P_A N Y_ ....................................................
SAG DELTA NO. 5 SEC 36 T12N R15E COHPUTATION DATE
WILDCAT FIELD APRIL G, 1981
.__~SKA
"'/ ' '?'-.. .'. ' ':'.i ,:': '.' ".: . ' '
· .
· ...->'"?i.: C.-~. i:'. ';: ;i.i,'-:!: d' ~ :~:,.' .".
......... TRUF '..' ,:,'~- ._qU.B~,S.E~ .............. COURSE ...... .coURs[ . _ _DOG_-_LEG .. '
MEASURED VERTICAL
DEPTH DEPTH
· .
D A.T E-~ OF_ _S U~_~_,._L9 81.__~
BOSS GYROSCOPIC SURVEY
JOB NUMBER BOSS-iG77'~
K_FI I_Y RUSH'I'I~J¢, FLF'V_,_=
.OPERATOE~dOHN SANEC
' . ..: I.O T A I .....
VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES
DEPTH DEG MIN DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST
~0_0 ...... ' '..: fL ~ 0'0_.:0_0 '.'.' :?i..'!.~;.l.6:0:,.6 8 .............. 0 ..__3 2 .... ,'"_$ ', 2..1:...5.0._E .............. ...1.5 ,:..: .".' :~:::.i::;:i'!;.:i? ~'~0:8:;fS:'}:':'~':: ::;!:::.: '::::::.: :':.?::::_ ::.-3~ ._E
300 299.99 260.67 0 16 S `33.50 E .28 1.72 S .69 E
/-+00 399.99 ,360.67
6 o o 5 9 ~ "9 8.:';i.:~:.i,/:::'::, ?:? 5 6'0.6 6
700 69 9 · '9 7:':" :: :;i:::i:!i:i:i i!:!i::::':: 6:60" 65
'.. ~% 0_0.:. .........
900 899,96 860,64
1000 999,95 "'960,6~
~1~ ~99,35~ _ .1~..0-,-6~ .......
1200 1199,95 .' "'/'.'.1 i60 · 65
1`300 ' ' ~1299.95 '~'" .1'2'60'65 '
· . ,
....... lq.O.O u '.- 1~_,.9_.3~.4 _. .......... 1.5_6.0 62 ............... O. 28 S':'g6.Gg_.E
1500 1~99.9~ 1~60.62 0 23 S 77,69 E
1600 . 1599,9q 1560,62 0 30 S 51,80 [
170.~_._9_~ _ 16 6_0....6.3 0 2.3 .... S_2.7...~.0_. E.__ ·
1800.' '.:1799193 "":. 1760,61 0 12 . S.' 15;50 E
1900 0 18 N 35,40 E .'.
2,.0_0_0. '~: '99'9!.i~3_.~ .;.'i:"::..'.::;~'::~::1~60_..61 ......... .......... _~,,l.~_,,:--N_52.,~,P-.- E__
2100 2099,93 2060,61 0 56 N 55,59 E
2200 2199,91 2160,59 1 9 N 58,59 E
2~_~0 2~99..,88 , ~6~D~ ....... k 52__N 2q,70 E
2~00 1 ,56 N 14'10 E
25oo 2~99 8' ~6o.~6
· ... :: ..,.
~ 9...3 2 FI.,_
VERTICAL
SECTION
0.00
-.01
.06
-.02
0 30 S 2,39 E .31 2,`36 S ,84 E
..0 ..... ~.1 .... S_.L7.,..Lg._E ............,2.-a~- 5 ,_3_a S I ,_04.
o · /+ 6 ·. '.'. s ~ .'"5'..19 "~ ' . '.. i 8'.i.'. :ii:;': .'~i!i::i~:i,:i::-:;::'/ii;~i':,+:,:.~ s.".;.s :i-' 2. 8 E'.. -. 3 9
o ~8:':'s':i/6.39 .E"....o`3.:::.':!':.-:;i'~':'::::?iiii:it'6:'~;°I'i.S E" -. 7`3
0 24 S 36,60 E ,19 7,90 S 2,0~ E -,79
0 20 .... S 63, 9 E ",18 '8,32 S 2,52 E -,'~9
0 ..... 3 2 ....... S_._70_, 6._9~£~~__,_21_ . 8_,_6.1_5 ..... `3.,_23 E . ,_0_8_
0 16 .. ~:""S'.58, 0 E '" ',27: -;:;iL..'.":..5,~8-E
0 26 "}:'S'"'22,60 E ' ' ..'-"27 i!;'~,2'~ ]E
2700 2699,68 2660.36
2800 2799.62 2760,38
2'900 2899.97 2&6_0_,.1.5_
5000 2999,1`3 2959.81
'1 ~9 N:17.89 E.
.1..__55 ......
1 51 N 22,29 E
2 3 N ~5. 9 E
5 2~ N 67,90 E
.25 lo.38 s 5.33 E
· 23 10.73 S 6,01
· 2_2 .... ti '-'%L-S 6.5
,2 0 .... 1:. 71~ S...... ::i::~i:!;:.i::: 6'. 7 2 .E
. ~ 5 ~ s '. :.':.;:,.;.:;'~:,.,::~.:';.~ 2:: E ..
· 35 10.7~ S~ r~ 7,74
:. .. . ...':~.. ~ . ~... ......~.- . .
,76
1.97
2.27
2o47
2.92
3,58
~,86
6.68
8,58
10,51
12.12
· 80 7.6:~ N 1~.8~
2_.. 0_8 10.35 N 19.19
1.52 15,57 N ' 26'.63' E
· .
13.84.
16.56
21.58
29,67
_.~_O_H_.I.O A__._LAS___K..A P~ETROLEUM.'COMPANY
SAG DELTA NO. 5 SEC $6 T12N R15E
s'~'ERR-~'--~hi~=~'~'~-'S'~-R'-~'EyING COMPANY :-" ..~ PAGE
ANCHORAGE, ALASKA
·
............................... ~_it,' ,~ ~ ...... .... :.,..-¢_..10 A T E i,. 0 F' .SU RV E Y APRIL
COMPUTATION D'-~':~:L~iU~ BOSS 'GYRoscoPIC sU~V-E'Y
WILDCAT
A__ ~L.~ A
MEASURED
DEPTH
FIELD APRIL 6, 1981 dOB NUMBER B0SS-16774
~~1~_~.!~_.~ ' J%,~/~¥7 /..ln91 KELLY BUSHING ELEV. :
VERTICAL VERTICAL ~NCL~NAT~ON D~RECT~ON SEVERITY RECTANGULAR COORDINATES
DEPTH DEPTH DEG ~N DEGREES DEG/~O0 NORTHZSOUTH EAST/~EST
FT.
VERTICAL
SECTION
..... :~.5_0 :. : _ 3,1'ZL~*_6_6 2- ' !:'i!?::':: i: :::: :3: l0 8'-:_3_0_-- ' 1_.1 .......... 1 __ 'N':.'7$ .3 0 :'E. ' ~_.:..1_~_~ .'.-.. 7. E
3200 3196,54 3157,22 12 46 N ·71,50 E 3.5~ 23,33 N 55,99 E
3250 3245,19 3205,87 13 54 N 74,19 E 2.60 26,72 N 67,01 E
3 3 0 0 3 2 9 3 ,_S& _ .3_2.53.,_2_~ .... 1.5 _2_1 ....... _N__7 . 8_ ,_ 9__ .E ........... 3_,_~_6 2 9 · 7'3 N 7 9 · 2 7 E
'". 3 3 5 o .. ' ~ 3.41'. ==========================================-~ 0'2.:.A 3
,- ,.
3500 $486,72 3447,40
35.50 3534,76 3495.44
3.6...0._0 ..... ~.582 ....f8 .... 3 _53_3_._2_6
3650 . 36.3.0':' 17".::' 85
8'3
3750 .... 3.,7, 23,,',~ O: ':!~ ?';.'.'?':15684 ' O8
3800 3769.20 3729.88
3900 3859.~8 .- 3820.16
_.{ 40.0_0 3947,55 3908.23
4 1 0.0" . 4 0 3'3,0 6 ' .; :..: :..i.'.:3 9 9 3' .7.4
A 200:': ...: ;: .'4. i 16":'':r:18 ':: '
.... ~3o'o:"i ..... ::::A..!.98.".~_7_:.::': :.':J::.::~::: :59.; o 5
~500 ~363.63
, ,, . ~ ~,o, ..'... :.:~6~5"o 6:: :/::':'~655.7 ~
50,30
60.59
72.11
84.6_6 ........
15 .36'..:.'.'::':.:::.N.{. 82:..' 0..:' E.': .:.:' ..: 2 · 2 0 :. : .:.~::::::.3:2:?;ii0:i~:i.~:: N~i~i~i~i:~:~?i::i':::92'~' ~ 0: E 97.7 9
i ~ ~ 5. ';:::-:N::::'~:'i::':~:~'..E:.':::':::::..:.'..:"-' i. ~ 1' 7 ::: i i o. 6 o
15 30 N 71,19 E ,,90 39.22 N 130,14 E 135,70
16 38 N 70,80 E 2,27 ~3,73 N lq3,23 K 149,54
.............. z7 ..... 2o ~ 7z.o E __~.~o ~.~ N Z~7.0~ ~ z~..~
2.3 ..... .2:.":-.'::_ N'".~5...,A~_:E '
2A 15 N 65,50 E'
26 38 N 66,30 E
2.8 8 '.'. :::,.',.~:'i:": ::...': '. .. /: :~ o'~:. ~,o .... r.. .
2.41 76.21
2.~1 95.7~
179.A7
196,54
21.5,48
o ....5.1 N 66.40 E 3 2__2 112.72
. ..... 2 .,.., ·
· 32 35. N.:6~'.,'3.0: E .... 2,.95.
· 3 4 '5 5' '.:' :.: .!:N'?/~ 3re.20'::i::E.'' :. '.:.,. :': .:2./+ 0:.'::,'.:
; 3A 31 ':N:':'.6'3,7.9 E '52': "1.84.
34 12 N 63.59 E .35 209.:39
34 10 N 63.70 £ .06 2:34.33
34 12 N 63,70 E ,02 259.23
N 222,86 E'
r,J 262,08 E
N .305. A3 E
5000 ~778,14 4738,82 33 4A
5100 4861,61 4822.29 33 5
5200 4945,3~ ~906,02 3_3 ...... !.2
5SO0 5029,14 ' ~989,82 32 56
· .
· ::::;:..35.2,52 K'
012":~ 3 5"E
3...32' :. E '..
N 503.93 E
N 554,28 E
N 60~.66 K
3.3 ..... 59_ ......... N.,.6~j,..?_O--.E.:':,. :_2_3'.'...'.,:':jt,:::3.3..4.'.,:'i.!.6.:.:N .': :..: ::::_:_:.:._754 '_7~ .... E .....
N. 63.40 E .33 358.87 N 804.62 E
N 63.50 E .65 383.A.~ N 853.88 E
N 63.29 E .16 407.97 N 902.77 E
235,A8
278.33
325.56
377,23
.432.46
489.06
768,16
823,56
878.89
933.61
987.93
1042.13
N 63.40 E
.712,66
· 27 ' .:...432.'44 N'. 951,54 E
· ':.. ~. , . . .:.:
'q~vm ,ils J~~B~ B~~
545,17
601,03
656,84
... ANCHORASE, ALASKA .; .. .... ,.: .'
_S_O~~A~pEIR_OLEUM C~O~j.P_~ICY .......... D.A.TE._~.O_F._SURVEY.APRIL ~+, 1_9.81
SAG DELTA NO. 5 SEC 36 T12N R15E COMPUTATION DATE BOSS GYROSCOPIC SURV--Y
WILgCAT
MEASURED
DEPTH
FIELD APRIL 6, 1981 ~~OB NUMBER B0SS-16774
--7.--- -' m~jm ii i ml w" m '~Z.-~F/;~ELLY BUSHING E~LEV_, :
VERTICAL VERTICAL INCLINATION DIRECTION S ~"~'~e~ O~ C f~ N G U L A R COORDI~AT'Es VERTICAL
DEPTH DEPTH DEG MIN DEGREES DEG/3 ~OCQo~j~ ~.S 0 U T H EAST/WEST SECTION
__ '~
550o . 3~.z~ -.' ' ,~' ~8.~7
5700 5367,00 5~27,68 32 25 N 65, 0 E ,3~ 525,13 N 11~,55 E 1-255,23
5800 5~51.55 5q12.2~ ~2 6 N 65. 0 E ,31 5~7,70 N 1192,93 E
~000 . .5~20"-~'8'?.72;,;~:~.~:'55~:'1..5~-,' , '~2 , 28 :'~.... :N?"~.'~]o;~ E,?;.~,.,'.:,' .~;:'%~'8
6~00 5872,~1 5833,~9 33 ~1 N 66,50 E .~ 658,70 N lq38,29 E 1576,96
6400 5955,80 5916,~8 $~ 17 N 66.80 E ,7.9 680.81 N lq89,50 E
_ ¢, 5 o 0 _ ¢,.Q.,%.7_.6~ ..... 5 9 9,&.,3L_ ...... 3.5 .__ 51 ....... N,._ 6.6,. _8_O--E
....
6600 · 6118' 13:::':;'/!i:i/6:10:78;'~ 81 256 55';.,,. -:,: N,' 66...8.0 'E ,t"' 1'."06::,'.. :' :..'; 726'. 8'1':'.::;'Ni:;,?!]:!;ili?:l'596 "84,:,' E
0 r-, 7 6.2 30 37. ~7..;. N';"67' 19 E '
¢,7n.,,z.v..~;.;n.,n .... . .... ,...,;19 · ....... '' ·
6900 6~5~.25 6314,95 59 1I N 68.40 E .9~. 797.69 N 1767.7~ E
7000 6q31,60 6392,28 39 28 N 68, 0 E ,58 821,23 N 1826.59 E
---~i ._.~0 6.5_Q.8_, 51 6_~ G.9_,_1.9 39 5.9 N_6.8..,5_O_E. ,.6.1 0.~_~_-.9_1 N 18..8_5._, 9_5 E
7200 6585,1'4 :": 6545,82 39 57' N 68,..0 E' ' .,32 86R,72 E
,, , .:, , , ·
7:300 666.1..59' ~ 6622.27 qO 18' N 68'.19 E' '37'""i E .
.....,
........ 7_~_~O..__.A3_~:_~_7:]'...:;~':;_,_6.~.k,.15 ....... -.,/~ 0 ..... 5.8.--.'__N_61,-6,9.-.E.:· ' ' ----,.?.A."
75[,0 6815.45 6774.13 40 8 N 67.90 E .8~ 9/4.1.78 N 2125.99 E
7600 6889.75 6850./4-3 qO 2~ N 68,,, 9 E .29 965.99 N 2185.92 E
7_7_0_0 6~66._._14 .~ 692.6.o8.2_ ......... 5..9__5..9 .... N._63..~.O_E .... ._9,.5~ 9~0._17 N. _ 224'5-76 E
7800 704,5°04",/ii':!7"...7.005'72 59' '.'28 '"'N" 67.69 E
7'~00 ~ .. ~2 "'N 67.80
R 0 .ED. .71 gg.,2111::.]-ii'>::?'~715.9_.]88 ........ 03: .... &6__-~--N--6.8...q.O...E---~----1.._O. :~- : ..: _ _
8100 7278,28 72;38,96 57 42 N 67,59 E ,q9 1084,21 N 2~77,~7 E
8200 7357,76 7~18,~.~ :37 0 N 67,69 E ,71 1107,28 N 25:33,59 E
1652,65
Z~9_~._0_2__
1749,26
1809.85
1~7_..,t.~_~8__
1934,10
1997.~5
2125.55
2189.98
2.2.5~_.~_6
2320.04
2384.64
24~9.1~
2515.01
2576.02
,2/~7_._8_8__
2699.05
2759.67
..
_.~S_O__H..I.._.O._.._A_.L A S K A PETROLEUP:
SAG DELTA NO. 5 SEC 36
WILDCAT FIELD
..,..A.L AS K A
,,
'SPERRY-SUN WELL SURVEYING COMPANY -~ ...
ANCHORAGE', ALASKA ' '
COMPANY DATE OF SURVEY APR IL 4
T12N R15E COMPUTATI'ON DATE BOSS GYROSCOPIC SURVEY
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
8500
8600
87o__o,
PAGE
1981
39.32
FT.
APRIL'6, 1981 ~,,~dOB NUMBER BOSS-16774
---- -- --=--I ,;~',~'~'~'"~.~ KELLY BUSHING ELEV. =
,~l~l-l~¢l~ II II'~II ~, .,~,7~i. ~/~,,~'J~P£RA'TOR-JOHN. SAM~C
...... COURSE ..... COUR..$~, ' .'~~_L,~ 'Zg~_ . TO~AL:':::': .~:.:': --
I NC~i NAT I ON ' DI REC ~ fou 's'~V-~?,~ R~;~T ANG U-LA'R' ' COoRD'I'N'A TE s"
DEG NZN DEGREES OEG)IO-o:,. ~ORTH/SOUTH EAST/UEST
. ·
33 ~2 N 68.69.:.'E';:~~;.''~ ' .".' .65"': ·'.1216.60
VERTICAL
SECTION
2936,74
2993.76
3049,67
8800 7848.37 7809.05
8900 7932.59 7893.27
900.o . 80_1~6~.3 7. 797_7,_._6_5 ....
9100 ¢,10 806iW5~ .~.
92 o o 8 i.8" 44.87
....... 93,0,0. : 8:%67,,'~38:.::Q...?78228.06 '
9~00 8350.86 8311.5~
9500 8~5~.76 8395.~
9~00 8518.76 8~79.~
9700
9800
9900 '
10000
10100
10300
10400
l~,.O. '
8603.04::.':
8687 · 93 ',> i:.':..i'.i.'::i:: 864 8"' 61
87.7 3 ;. 2_3..i::.: ::'? !'. 8,.~:3,3 · 91
8858,87 8819,55
8945,05 8905.73
9031,51 8992,19
9117.75', ...:,. 9078.~.3
920.4,10 :i i. :':?'...9164-. 78
9290 · G3r'' :" "' :"'92 51 "31
10600 9377,10 9337,78
10700 9463,63 94.24.31
10800 9550,36 9511,04
10900 '"'9637:,2'8'.:' '" '. 9597.96
1 o 95 o ~' "..;. '.~.,__...9 680'i~' 7.3..._....,.-..:':: :~.:i,':; :. 96'41.41
. . 1_1__0.0..0 'T. 97,2/t.;!'"1'5]; 4.8
11063 9778.90 9739.58
32 58
32 15
3.2 .... 39
33 17
33 .49 ·
33 35
33 11
32 44
32 58
N 69, 9 E .76 1236.39 N .2853,68 E
N 68,69 E .75 1255.80 N 2903,97 E
N .6.?_. 9 E .45 1275.1'1 N 2954,04 -'
.N... 6 9' ;':.~.;0 :' E "": !'.. :' :. :...,:'. 6 5:':::i":i':'!:i!i;!t!;:!?<:l 2 9 A ..5 7.i.: N ':'::::..::~ 7ii:ii:::3 0' 0'~-.8 6. ~
N 72,30 E .78 1349.60 N 3161,26 E
.
N 74.30 E 1.18- 1365.24 N 3213.37 5
N 76. 9 E 1.01 1379.10 N 3265.82 E
3104.63
3158.52
32i2.18
3256,60'
3321.87
3377.37
3432.38
3486.69
3540.71
3 !__~.6 ."~2''4 0 ~ E. '"'.~'j~;!ii~.:'~. §~'.':'. :?i..!4:o7:';i.6!:::;N:'::!:!ii:!~':.~:~':~:'3.~..22..,.:0 8 E
30 53 N 82,80 E .42' i4i3.81N 3473.28 E
30 2 N 83.40 E .91 1419.91 N 3523.62 ~
3~ ...... ~.7 ......... ~_8_2.8o E .40 i425.95 N 3573.51 E
35
36
36
37
37
38
9q,
46.
97,
47,
96.
45.
06-
07
12
50
88
81
~.0 ........... 5 N 'i~8'4'~0 "E.. . '.:' . :....._5,5:il;.:..:::~'..:::.;.t442'Ti.;'.N:::.'..i;..'i:.':'./.33_23'74 E
30 13 N 85. 9 E .38 1~47,31 N 3773.77 ~_
29 55 U 85.40 E .3~ 1451.~6 U 3823.72 E
29 46 N 86,90 E' ,76 1454,80 N 3873,38 E
...........................
3895
3944
3992
.03
.03
4041.26
4089,60
4137.39
29. 30
29 47.
2.~ ..... ~8
29 38
N 7.5 o ,:' 2 o,,
N ¢.,7.50 E o.oo 1461.Ao N /+003.36 E 4261.76
H 0 R,I_Z...O.N T A L DISPLACEMENT__
..
THE CA LcuLAT"I ONi 'PROCEDURES
= 426_l...7..6_.._F_EE_T_ AT NORTH, 69 DEG. 56 MIN. EAST AT MD : 11063
ARE BASED ON THE USE OF' THREE DIMENSION ~." ':." .'.'~. ',VATURE
,.
DELTA NO, 5 SEC 36 T12N R15E COMPUTATION DATE
·
· . .
· ' ' ':'" .. TN T E' R P {3 L' A_T.F..L)/,A' LU E S_ F. OR _. E V.E.N...i.O,Q.O__EEJ~~T__O.E_I~F~.A.S_U .R EF'j :_ D E P.. 1'. H' ~ :.i.:.~ :i 'i :. :.;~ .:i :: ~:':..:. :.' i-'. i.;fl '...-.:
SPERRY-SUN 'YELL . SURVEy I NGL', cOMp ANy"i.i'i:?::~"?":'::ii"i.'. .'":.::i!.' -""' - · PAGE
·
''' '/.::i~ ....':'..-... ., .- ..
:. _DA_TE..OF SURVEY- APRIL 4. 1981
dOB NUMBER BOSS-16774
KEULY BUSHING_ELEV, :
'-" OPERATOR'UOHN-SAMEC
MF~$URFn
DEPTH ..
100
20
40
50
?0
TRUE SUB-SEA TOTAL
VFR:TTCA/ : V F R TI CAL_~P.E C T A.N GU LA R__C_O_(1RDI.N A..T-E S _ _EI.D -_.T_V D VERTTCAL
· .. DE P"TH::~;~i;.~:i!:: !:'?"'.:'~;i::::~.: i'::i '.D E p'TH ' N OR T H / SO U T H ".': E.'A S T/'WES T:';{~.' D I F F E R E NC El ~..ii:..].": .::'i::.. C 0 R:R E'C':.TiL~'oN ::]'::?;:.?'!.':i:i:'.. '.
n : .."..:n ,.n n:~:i::..i: .-~.7L.:i.i{:"~.9_'.,:.~.2.-- ..... , .... -.L...LO., 0.0 ..... i ...... .: ...... :.~.;!.::':.:'ii":0.,,i.0:0/~. L.~: .:il.o...J)_O L: ..f:::: ~:.'.' i'::.:i':.. ...... ....
0 8.32 S 2.52 E ,05 .05
O0 3.1.37 S 7.26 E .07 .02
..i ~.,.5 7_.m. _2&,.6~_~ ._~ . ~ n
~ i2.72 N .:~":~::.:~::.."S 05 · A S :'.::.: 5 2"~ 5 :: ':: '. ~:L.:? ~:: '...
5 ~..2._~-.N~:]~'.~~,..S~.'~:~. ~ ':': :'~'.;27~ "~..~ ~.,":~ :~ .;'.~ ~....:.-'. ..........
~0~Z.28 N 2~20.72 E 800.80 2~2.~
~ 0000 '8~58.87 .'~'~ """ 8819 .'55 · ~ ~ z 3.fl~ ::N :.':.-':.' / 3473; ~ ~:10 :: "':/',~'::::":: ' :'.
~1000 9724'1 : ' ~60,O~'"'N ':.:.::;.:::: 3972 '. : .-
999,95 950,63
1999.93 1960.61
O0 ?q99;!3._ . '2959,.B..1..
00 '~': i ,, 7:178';1.:,~.?:!:!?ii.i':,~..?'.~ 8',:'~ ~.
O0 6451.60 6,392,28
8000 7199.20 7159 °88
THE CALCULATION PROCEDURES ARE BASED ON'THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
·
'SOHIO ALASKA
SAG DELTA NO.
WILDCAT FIELD
_ A.LASKA
m m 'm m '" s~'~-R'~'~,'~'U'N VJELL SURVEYING
· ' ANCHORAGE~ ALASKA
PETROLEUM COMPANY
5 SEC 36 T12N R15E COMPUTATION DATE
APRIL 69 1981
CONFIDE-NTIAI-
,.IN TE'RPOLA T__E)_ VA.L UE_S._.~.E0.R_~_E¥.EN_.! O.._O.__FE_=.~.T OF
DATE OF. SURVEY APRIL
JOB NUMBER BOSS-1677q
KELLY BUSHING ELEV.
PAGE
1981
FT,
.._U..~E A_s_uP__,E.O ·
DEPTH'
39
139
TRUE SUB-SEA TOTAL
VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH · -' "; DEPTH · NORTH/SOUTH EAST/WEST
· . ,
'" 0'. 00 :%'!, ' .~/'39' 32 0.00 , '0.00
39.32 .0.00 0.00 - 0.00
139,32 100,00 ,58 S .19 E
_ 2_,_3.~_ · 3___2_ _ , 2 0._0_._0_0 ....................... 1 ,.,'-+.3_._s .5 2 E
MD-TVD VERTICAL
DIFFERENCE
:..
.' ""0.00
0.00
,00
CORRECTION '-.:. :'; ' m'
' -7'.. .:. ,,' ........ ~ ....
0,00
,00
.00
~ ..... . ,..5._39 ;.5_39.;']3'2. 00', 0
639 639.32 600,0
739 739.32 700,0
839 839.32 800.0
.
2.71 :S.::::". :i'.':.:;:' ,'85:E '"'."i
5.17 S 1.32 E .03 .01
6,57 S 1,48 E ,OZ~ .01
7,52 S 1,80 E ,0~+ ,01
939'
1039
1139
1239
1339
439
1639
1739
1139.32 .... .1.100.00 8.7q S 3.58
1239.32 1200.00 9.00 S ~.05
1339,32 1300.00 ' 9.66 S ~.,35
1~39.32 lqO0,O0 10.25 S ~.93 .E
. '15'39.32 "". 1500,00 lO.4q S. · 5.59
..
'16'39.32':.:: "1600.00 10.95 S
.'.173'9,32 '~.. 1700.00
, PAGE
SPERRY-SUN WELL SURVEYING COMPANY' 'm
ANCHORAGE9 ALASKA
_S OL-LI.O__ALA~5,~O~U-tL-C-O--M-P--A,N Y ............................................... D,A~ . OF _S U.B_V_E_Y A P R I,L__5_t_J_9_8_!_
SAG DELTA NO. 5 SEC 36 T12N R15E C'~"MPUTATION DATE
WILDCAT FIELD APRIL 6, 19'E, 1
_AJ_JLSJf~A .... - ................ OPERAT. OR-JOHNI 'SAMEC
"' '" CONFIDENTIAl.
· "' ','i' .":;. TNT~RPO. LA_T. ED._V. AL;UES..FOR ....EVEN_J,O.O._FEE,T~,O~m--S.UB_-SEA r')FPTH ..... "',__. :..' .:.,';::.' ~.~:.,:~;, -. '. ....
,JOB NUMBER BOSS-16774
.I~F..LLY B.USHTN6_£LEV_. =
3_9 ._~_2 F T .___
DEPTH
TRUE SUB-SEA TOTAL
VFRTTCAI V FJ~_T_I.F_AL____R E C.T. A N G_U L/LLC.O.O. RD-T. NA*~'Z-&---J~-D-'-T-VO. VFRTT£AI,
. *DEPTH NORTH/SOUTH: . EAST/.WEST ''!
.- . · - - :. :. ::: " ':-~ -' ..' ,,::,.:;.;i~i?,::..~: .:..::. ::~:' .' i .;!: :' i:::ii.:::-..!.::;:~..i;::ii':,:: ..., ..';' i:::..,: ::' ':..;?.:i.i;~;; i?i..i..i:!i 2.
..... ....
1939 1939.32 1900.00 11,57 S 7.0~ E .07 .00
20;59 20,39.32 2000.00 11.25 S '?.ql E .07 .00
,,, 21 ~ 9 2.~ ~ 9 ,_~ ~ 2! 0..0_..00 .... 1,0,,. ,~_~_S_ _7_.,~..7._E ,~ ,~_ _ .01
..
2239.
2~'
2559 2539.32 2500.00 .30 S ~2.~3 E .2~ .05
2639 2639.52 2600.00 5.01 N 12.33 E .29 .06
_6...05__N 1.~...9.~ .... E ._ _ .3~ ..... ...-0,5
2 7~ ~ 2 7 ~ 9_,~ 2 2 7 0.0_._0. O_ 8 ' ..... ~ ~ ~' ........ '~ ...... ~'0 '6 ' ........
:' ~2 ~ ~:9 · ~-2~;. ~..' ~'. 28 0 o'. 0 0 8.6 ~' N .. ',:' .:.: ::. 15 · 5 .. E :~.. ~::.:'?:.'. ~..:~:~;~.~?~:? :.'~;~:~' ':'.~. ~?}';~:}::;;:~,;~.?~?~?;~:~i.;~;~?:.';?:.::~;~;;~".. :. ":. '.'
2 e ~ .:. ~ 729 ~ 9.~'~ 3 Z ~'~'::'?:~ ' 2~'0.0 · 00. ' ' i i. 5 ~'"~' ...:'.:~.;'~ 2 I'.6 5' E-:: ~".':~'/.;;,% :':- '
2939
31ql 3139,32 3100,00 19,7~ N %~,62 E 2,23 1,14
32~3 3239.32 3200.00 26.32 N 65.61 E 4.64 2.~1
~5~ 7 33 39, _~_2__ ~.0.,._0.0 ........... ___ 3. i....ES_N 91., 7..3_,E_. ,8_.}6 ,3_. 5 2
~ .~5s~ '
~ ~ 5.9 ".._..3~ 3 :._,;~~_0_0 ~.~._~?. :~.~ Ls~...,7.5,,N_L,::'-"',~%.~..
nlUFinrl Tl l
I'II I I'II I II
· .
-~'~'E'~"'~'~'LJ'N-"w-I~'LL SURVEY !NG
- ANCHORAGEs ALASKA
~'~J~I~_L A~_A, ~P ET ~,0 LEHM. C~.~ N ~
S~G DELTA NO. 5 SEC 36 T12N R15E COMP'U"~-~T~-O~'-~-ATE
WILDCAT FIELD APRIL 6e 1981
A__LASKA
COMPANY'
DATE: :'OF'~SURVEY AP'RIL
PaGE
1981
dOB NUMBER BOSS-iGT74
.... . OPERATOR-JOHN SA'MEC
. , ..v':'..-:"..:'" · : ... .: · . ' ...;'~'-i" '.~-: ,.: .;'"'.:'i: :
39.32
FT.
TRUE SUB-SEA TOTAL
MEASURED VERTICAL VERTICAL__REC_T_A.N._G_U_LAR_ COORDINATES MD-TVD VERTICAL
DEPTH
3767
3739'* 32..; ::.. 3700'.00
3877 3839,32 3800,00
3990 3939.32 3900,00
· .NORTH/SOUTH . .:.. EAST/WEST::ii
· . ... .... '
7. o., 7~ N '.. :; _~.~o.,i.~..~._~_. '.'..." 2
89,67 N 252.82 E 38,15 10.13
110.85 N 301.15 E 51.22 1~,09
4]..07 ~039._3_2 4000,_0_0 .................. !.36..,~.1 N 356.13 E 68,11 16.90
4228 '-. 166.24'..N....;. '41'6-'7'7--E.. "... '.'.8R.90 ~;' '~'~20.79 ::;..:'/ ..
43~9 i. '. 4239"3 2'0"0,00 196,81 'N;"" : : "~78,57' :',:i'i;.".;:(":ilO 7'.:i"::'
4439.32 4400.00 257.11 N 600.38 E 152.1P, 20.89
4591
4712
~_2 .......
5073
5192
5312
5430
5549
5667 '5339,32. ;'.;.,,5500o00 517.71
5785 .' 5~'.~5:.'
5903 ............... 570.89.
4539,32 4500,00 287o~.9 N 661.02 E
4,63~_, 3__2 4600,0.~ ..................... 3.!~.,~_..~ __721,1.~_E
473 9' .32 ?::i'ii:;??" 1.4.700 · o 0~.3 q 7.27
4839 ° 32"i.~:'.'/!.'.i'?'~'800,00 :: 1'377,00
·
5039.32 5oo0.00 435.40
5139.32 5100°00 ~63.51
5239,32 52~Q_~00
N.' . .,'781,~2'E
N ... :.."840.88 E
N ~' .... 8..?..;~..,,.2.5_. E
N 957.~4 E
N 1014.77 E
N 1071,71 E
N' ..... ...1.1-28,62 E
N '..;..i 1242, 78 E
173,01 20,83
193,53 20,51
21'1."3 ":!9 9 :..'/.::;~;:~..'..,:'i ':~..:' ::ii'/'.'..i 20',~.:4:.7 ::i;;~' .:~ '~',.' ' .
2~ 4?,:0 i!'?;ii;;; 2~0-o e:~::?,~.'~: .: ';,.. ·
~ 5:s · '~:~ ,.~: ..,i.: ..~.:: ::; ~;;:i;~i ii.;; ~::;;. ;?,',!:.~. ,;:':iq ~,i;;.:!~.!. ,..~ ,:.:ii ;:::, L.. ,,, .........
272.81 19.32
291.~6 18.65
309.72 18.25
SPERRY-SUN WEEL ,.,,JRVEY ING C. OM*PANY'.'~::;*;.!?~.i.:'i~.*:,i.:~.:.i.' .. *i..*"; . ~:.'"
· ANCHORAGE,~ 'ALASKA ·
...,,~C~.EA PETE OLF'U,~.._C_O.~P..AN.Y ......................................................
SAG DELTA NO. 5 SEC 3G T12N P,].5E COMPUTATION DATE
WILDCAT FIELD APRIL 6,~ 1981
._.AI_~. ~K A
CONFIDE IAL
" ' ~' ....... :" ' i: '
: ::: "i ·" ' : "·
· ..' ,' ..:; ~.'. · .. .
,:' ' .j < :L ~ .' '. ; ' ...: '.
""' "'"" IN&T-ERP_O.LA_TE.D_V-A-LUES'.-.F..Og._. EVEN_10.0....E. EE_T.-O~'-~U.B-:-SEA DEPTH' .~ . ...... S; ;; ' ;-'.:i:..',. .... '.
15'A GE '9
DATE._ OF. _ SURVE_Y__ APR IL_4 ,_~ ],.~.B_l__
dOB NUMBER BOSS-1677~
..... K.F_,.L.LY _B.USH I NG_E_L._E_~.. :
"OPERATOR-UOHN .SAMEC ,
3 9
TRUE SUB-SEA TOTAL
__..~. ~IJR Fn _VFRTTCAL V F R T,.I.C AL.___.gEC T.A N.G U L AR_._CO_O.E.D I.N A,T E.$,__ _ IV].D -__T~V D _ · VE R T T,_C_A_L
DEPTH ....' :.::.. :.:..DEPTH/L.:.i.{.~.::.:.:.....i: DEPTH NOR.TH/SOUTH :' EAST/WESTi, DIF. FERENCE:';:'?';'?::.~':i. CORRECTION?~:.:';i/:i;.:'
'. "i. '.:;. ?.:' ?:::-..;?'i:'.'-:'..~.. :.. i..ii~?'.i!~i:;!'.',........ '. '..:: '." . : '.":...'-':":'.;' ..'iii~-;.i~ ~ii.:..i~:'~.;i~i!;.~..:::;:;?:~;.,~ ,.'~..']~...:..~i.;..~:.; ..~. !. ~ ~..' .~' '. ..... ·
6140 5739.32 5700,00 623,6q N 1358.31 E 401;16 18.62
6259 5839,32 5800.00 6q9.86 N 1417,95 E 420.51 19.35
63~_0 ~ 5_93_9,,._39 .....5_9J3_0_._0..0 ............. 6.,7.6.,,38 .... N,__.__1.&_7_9_,..l_7__E ...... ~0,.,_73
6502 ~:~'?~"'$0'39~'~3~'i~!:~i·?:.?~i~;:i~6.000"0.0"'~·' ',. 703,92 N '15~+3-z+3:':.;'Ei.::i~,~:'i:?:'ii':.:..'.i.':t+:62ii,:!?61:!:i.:ii!.:~.:~?':i''
6880 6339,32 6300.00 793.21 N 1756,z~2 E 541o41 27.91
7009 6439,$2 6400.00 823.61 N 183R,48 E 570.68
71 ~, 0 6uS_,3..9_,..~P ~5.0 _0_ o .. 0. 0 .... 8.5~.~..,.39__N.~i.9..1..O_,_O_D_E ........... 6..0~~ .~ j
';72.70...i...".i:6639,32.,.i::':':i.!.i?16600,00 ".· ' '885,'?4 N · ~'1987,,89":'Ei.':'"ii·.::..'":'.:"63.'1.°~+7 :.:.:;::!i
7664 s939.32 6900.00 981.71 N 222~.92 E 725,~,8 31.16
7795 7039.32 7000.00 1013.16 ~ 2302,11 E' 755.86 30.18
._.,.- 7923 7139 ,&.~ 7_10.0....0.0_ .1.0_~_3 ..8.5_N _2.3..7_7._,_i.5_E 7__8 ~ · 60 28
8 b50..... :;i.i?.i:~7~2..3 9.321 .if:i:/:/i: .!?~2;.00.00 1072.77 ,2'z+ 49.61 E .i ':. :...:: .81..1 ,,~+ q:.
' '' '" ' '"' i, ' ' ." " ' " " · ',$. 'u "' . .. ' .;'. . '. '; .v. 2:........
.817 00 ,.0 0 ii '". i'1.0.2;.0.I~i'. 'N~:',: "':;.'.{;! :2'52.0."'73' E 3.7., 59
. s::_ ? o.o_L. L; .....
..~!0. ALASKA PE
SAG OELTA NO. 5 SEC 36 T12N R15E
V[LDCAT FIELD
~S_U_fLE o
DEPTH
SPERRY-SUN WELL
ANCHORAGEe
SURVEYING COHPANY .... '~'
ALASKA . .: ?.
,. ' OA..TE OF,
APRIL 6~ 1981
sURVEy APRIL
JOB NUMBER BOSS-16774
KELLY BUSHING ELEV, =
OPERA'TOR-JOHN?:.SAMEC..-
-' L TED VALUES FOR EVEN 100 FEET.~.· EA:'' TH~i~::::~:!:;~!:~:~:;~:~:::~::~:~j::~:~:~::i::~:.::~i~j~`~;`~:~:~-'
MD-TVD VERTICAL
TRUE SUB-SEA TOTAL
VERTICAL V_E R T ~ C ~ L~_R..E.C_T.A.NG_UL A R COORDINATES
· . :DEPTH~":'.':..:::':'::.::":!::'."'DEPTH NORTH/SOUTH "..'....EAST/WEST.'
.. !. ;....' :.. '.' :. .... .. · ...... ..::, .. ' ,'?
:'~ : .' ...., .". :.:...'.:. :': .. :...-.: ·
: '-". :.'. · ."' : '. ...i",: !:'::'"..'.::' '...,..'
8_.~_5_.. "7. 53_c) ,:_~_2 ': .'~' .....'- 7 5 o o_.:0_o ........... 13.5 8. -'3..P--N: :___:. :__~_6.5-Z'._~.~'[
8548 7639,32 7600,00 1185,22 N 2723,28 E
9266
8669 7739.32 7700.00
'- o 2 6 o o o o o
. . . . ,. ;
8239.32 8200.00
1210.42 N 2786.54 E 930.01
..12_5.~..$.0_N .... ~4.8~_2~_E 949.90
1257..54 N:.'::..i',:..:..:.,2907.95 .~'.:~:·. 968~6.q
1280,'22' N"':; :~:'.2967"q1'E'..~ :'";:.: :9"
!.~.A~? 6.1._.N,' · .'__.~:~42~...~'9· E '."::.':~ ::i'0';0 ~":::7:
~326,28 N 309~o37 E 1027,00
20.98
19,88
20,28
PAGE
A, 1981
39.32
lO
FT.
9386
.____~.
9624"
9742
~9 86:0
9977
10093
).~0 209
10325:, ..
8339.32 8300.00
8 ~_~_.5 ~ 8 4 o_0_,_o_o
853 g ,..3 2' :.;.::;,::'!".:7850 0 · 00
8639,32 :i~:.;::"~ 8600.00
~7.39 ...3_2...:.~;/::.::.:". '.870.0~._0__0
H~39,32 8800.00
8939.32 8900.00
90_3.9-32 ,., 9 Q_O. o .00__
91.-3 g ,:.32..::{".:'"':..: ::910.0 · 0 O-
1347.31 N
__!.3..6.6.....0_9 N
1382.30 N
1395.12' N
1404.4/+ N
1412.35 N
1419.53 Iq
17.26.52 N
3154.06 E 10/+6.
__3216.19 E 1066.
:32.7. 8 .: 7.7 E.? .~{:;' -;-? .':: 1085.
331~' o', ~' ~..'"';" E.!.':.:~ ~i:":: :ii'?:...~1.::10'.~.
88 19.89
10 19.21
3~61.67 E 1137.90
3520.33 E 1154.D6
3578.04 E 1169.73
16.89
16.16
15.67
MAY 1 z~ IS3!
.-:.
.. -.
,~, ..".'/' ~' SPERRY'SUN WELL SURVEYING .COMPAN.Y'i.ii.i..'' .,'~i. "" .. ·
..:i.'/'.'~'.~'',. ~.'.". ANCHORAGE, ALASKA ' ~i."!?b'i~'
_.~[O_ALASKAi PETR~~.O~[P..~.Y_._ ...................... '...D'AT£ .OF_SURVEY: APRIL
SAG DELTA NO. 5 SEC 56 TI2N RISE COMPUTATION DATE
W~LDCAT FIELD APRIL 6~ ~8[ dOB NUMBER BOSS-IG77~
TRUE SUB -SEA TOTAL
_ MEASURED. VERTICAL V E RT ICA L __.RECIA NG U LA~'~__.C.O~OP~DINA.T.E.S ._ M D,_T~V_D V_E_R TI CAL
DEPTH .' i-':":'.-DEPTH"-:'!'?().'i?'?' DE'PTH. NOR TM-/SOUTH:'''.~ ' EA:sT/WESTL.::'"'DIFFEREiNCE'?::i'i:.'.:> CORRECTZON':~i":ii'f':::;:"~:' "'
~'i/'.:?i19-4~~~_~_0.]0',.0.0 ................ 1.450, 53_?:--,_ZL.5.8.'O~..'.7?]E[:L:~:]~.~' 15~'"~'7'''~:;:.,.''~(~] -~. ~ .............
107,87 9559,32 9500,00
10902 9639.32 9600.00 1457.67 N 3923.90 E 1263.03 15.07
_ 11 017 _ q739.3~ : . g~_O....O.O ....... ~.6.O_.i~
[[ 040 :'.. ,.".:.9'758'9 ~"9719.59
,, .~ ,. ~'... ·., .' ,. ,.,, ..,
~.. T HE.' gALC_U LA.T. T ~ -'~ RO CED. U. RES_US E,.A...LINEAE..:/N~ER
THE NEAREST 20 FOOT HO (FROH RADIUS OF CURVATURE) POINTS
_.~$ 0 H____I_O_...A_L AS K A P_ETROLEUM
SAG DELTA NO. 5 SEC 36
WILDCAT FIELD
.._~ ~S ~ A
SPERRY-SUN WELL SURVEYING
ANCHORAGEe ALASKA
COMPANY
T12N Ri§E COMPUTATION DATE
APRIL Ge 1981
iDA TE.,__O,F, SURVEY
APRIL
JOB NUMBER BOSS-1677~+
~.,., BUSHING ELEV.
· ','. '.,.::~.'. i..:! ,' ~:.'":', '.,~..ii , ~ ..:.-OPERATOR-dOHN SAMEC
' ' /':;~"':~:;"':?'~':" INTERPOLATED. VALUES FOR SPECIAL· sURvEY.POINTS.:~:.
] , , ,,- ; ..' ;?'...' & :.-: ;-.~ ' . ._ . ............. .
PAGE
1981
12
FT.
TRUE SUB-SEA TOTAL
MEASU~_E,D VERTICAL VERTICAL REC T A NG .U.,L_AR COORDINATES
DEP TH ' ..~ ' DEPTH i~:'.'~:':?':.~.i:'i !, ii:?'- DE PTH ~'NOR. TH/SOUTH. '" ". EA ST/WEST..: :.~:i:.'~'.~::~'. ' ;' .'~'.':~: .:~,i/' i/;i:? :i...?::~!i ' '.
.' 901_0 /.:: 8.0.2_5. o;.:39 .;:.:..."?i 7986_. 07 ·" ' 1.2..7,7:..O..4.,..N..::--L.::.12_~59 08 E 'L':It',IER TOP.'.:: i!:;_ .-.i'... ... _
9522 8~.53.27 8~13.95 1,'368.q. 6 N ~22q.82 E 9 5/8" SHOE
1099z+ 9718.93 9679o61 1~59.91 N 3969.26' E PLUGBACK TO
~Q.O _ . 972~,:._J..5 .... 9..6_.8_~._..8_3 ....... J.~6..O..._O._.~_N 39_~7_2~_2_2._E SURVEY DEPTH
" ...... "."'~" 'N ' " '
.1106~ · 9778 .90 ',,'.'.,'.i,'::~.,9.7~9 .58 ".'. '.' 1~+61.~+0 N '..~00~""$6 E" 17 .'.~,'~.,I' EE.i. SHOE"
1105;5 ' 9778°90.::.,:.'::ii:i'!"!:'973CJo58" '14.6:1.°'~.0 N' .,'i.z~Oo'3°.'36...'E:."'" ;".?TO "
' :" :" i: i ".'. ' ... _".. ~;".i'..,,i'";:!'. ...... ~i' ~ .i;ii :":..'~. ".. ...... !. ?~.., _.."- ......... '.. '~."?.' . "'..,. ~.. ..... , '"' i'.' ii~:' ~'?';~,..
'. '...'. ~.'i'.r.:.. .. SOHIO ALASKA PETROLEUM; "~"
]~.. ~.. ~'.~-? i.,... ~ .. 0 M P A i .
,___s "
'' ; · :..:. :
............... ; . '. A.G.. DE. LTA....N.O .._5._~E.C--3.6 T
STRATIGRAPHIC SUMMARY
DERIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA
--mm mm mm ~mm *mm ~mm m, ~mm +mm ~' ~m'mm 'm' *m' 'm~ ~mm ~m 'mm ~m *mm ~m *mm, mmm ~mm*m,, mm ,mm ~ ~m ~mm~ ~ m m m ~ m e m m e m m *m mm,m mm *mm mm ~m ,m
"~
-' MAR RJ'-~-'' Ep ' '
..... KE .... *' MEASUR ED~. D TH
mmm . '-:.-' ;.j .
· . .. ; ....-... 1.. . ; . :....
m,mlmmmmmmm
TVD-- ' - --:*'-"': .'"..'~i?m~ ~THT CKN C 0 OR D INA T E $
'''*"'' ESS ' ~ITH REF. TO WEL'LHEAD
~ R~K.B_ __ .- .... SU, B~-S£ A,.'-..:....~.;..~/*L ".?.i .:VERT..[ CAE;.'.;': ' (.OR IG IN-... 7
TI.~~ " SEC 36 T12N R15E
.... 39 , 7,9.8,6_,_D_7 __1 2_7 7 ,~0 ~ N 29_53_o_0_8.L
7" LINER SHOE 11063
TOTAL DEPTH DRILLER 11065
'' ~ mmmmmmmmmmm~mm~mN~m~#~m~mW~m~m ~m
~ROM LINEAR EXTRAPOLATION BELOW DEEPEST STATION° 'i'~'~>;i'i'~i., i~i:'~' .... ',,~ " ~, ?'~ii',/ ~' ' ..........
,_,2J_C~MRU.~_G_RA '-~. P_~.Y~ S~_N--T._H., R.EE D,I MEN.SI ~N.AL',...,~gD...I..U~,.:~F. :.,,.,._~_U~_y~.~[~... :.;.. .... . .......i'..:..i~'..:.:..:.i.ii~..ii.!:..,......... ....... ..-.
DATA 'CALCULATION AND INTERPOLATION BY RADIUS OF CURVATURE
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmm m m mm
m mm m mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
. . .
- . : '"'" ' ," :' "' ::';i?i"::'..'.' .DATE..~.:.OF 'SI VE.Y.:?'::APR IL
COMPUT. A.TI ON. DA ........... ..?;!..,:.:!::~':': ?i:-:;':~,! '.....~.:"
1981
Check Form
for timely compliance with our r~c~ulations.
-/Operator, Well Name and Number
and Materials to be received by: ,~'~--/3-~/
Reports
Date
Required ! Date Received
Completion Report
Well History
Yes
Yes
Remarks
Samples
Mud Log
Core Chips
Core Description
Registered Survey Plat
Inclination Survey
Directional Survey
Drill Stem Test Reports
Production Test Reports
Digitized Log Data
Yes
//
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO: S~ate of Alaska May 12, 1981
Oil & Gas Conservation Conmission
3001 Porcupine Dr.
Anchorage, Alaska 99501
Attn: Harry Kugler
CONFIDENTIAL
REFERENCE: Sag Delta #5
e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
(1) print and (1) sepia of the following:
/L Scale Run Number
5~ "1
~/~FDC/CNL 2" 3 & 4
V/JFDC /CNL 5" 3 & 4
v~FDC-GG 2" 3 & 4
~-~FDC-GG 5" 3 & 4
v/v4)IL/SFL 2" 1 - 4
,~/~?IL/SFL 5" 1 - 4
~v¢.S 'nnUltaneous DL 2" 4
/~simultaneous DA 5" 4
~~ 2" 1-4
5" 1 - 4
¢~PL/ML 2" 4
~/F.JPL/ML 5" 4
ufOS_ L/VD (2-28-81) 5" 1
~/Sidewall Sample 5" 4
v/v~DT 5" 3
v/v~DT 5" 4
/VRFT 4
v/VCBL/VD (4-4-81) 5" 1
~)o :pages of. Core Descriptions
1) LIS tape and listings
b~l) mudlog from 2700' - 11,350'.
SOHIO ALASKA PETROLEUM COMPANY
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
May 13, 1981
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Sag Delta #5 (36-12-15)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of April, 1981.
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
CONFIDENTIAL
MAY 1
Alaska 0il & aaa Co.~. Commlss/on
Anchora9~
~ ~'~ LASKA~.,,.L STATE OF ALASKA
A . . , AND GAS CONSERVATION C(~MISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well ~] Worker p 'o,~ -- _
I
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska
99502
4. Location of Well
at surface
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 39.32' AMSL ADL 34630
80-129
8. APl Number
50-029-20527
9. Unit or Lease Name
10. Well No.
Sag Delta #5 (36-12-15)
11. Field and Pool
Wildcat (exploration)
For the Month of April , 19 81
,12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
This well has been suspended (see well history attached).
13. Casing or liner run-and quantities of cement, results of pressure tests
None
14. Coring resume and brief description
None
15. Logs run and depth where run
CBL and gyroscopic survey @ 11063'
,1 6. DST data, perforating data, shows of H2S, miscellaneous data
Suspension of Sag Delta #5 witnessed and approved by Doug Amos of AOGCC. MAY 1 4 ]981
Rig released at 2100 hours, April 13, 1981. Alaska0il & Ba.s Cons. C0mmi,,
Anch0ra§~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
"SIGNED ~ '-- -- -- ---' ~--w'~ TITLEDistrict Drilling EngineerDATE
NOTE--Report on th~ required for each calen~iar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed,
Form 10-404 Submit in duplicate
',ion
CEMENTING SUMMARY
PLUG JOB ~/
WELL
RIG
DRILLED DEPTH ~/.,,~ ~ ~
--
MUD WT. /~)~ ~__
DATE ~//--~/
, LAST CASING
' HOLE SIZE
PPG. PURPOSE OF PLUG
REQUIRED PLUG LENGTH: FROM'. ~/.~/~z~ ' UP TO .j/~/~ ' ( .~a9 ').
CALCULATED CEMENT VOLUME: /~) ._CU.FT. (. ~ SX.) + %
EXCESS, TOTAL CEMENT USED WAS ~ CU.FT. ( ~ ~SX.).
WITH opEN END DRILL PIPE AT J~..~3_~ ', CIRCULATED
o
AHEAD. MIXED AND PLrMPED
DISPLACED CEMENT WITH
PPG
f(~.. ,. CU.FT. (_ .~/'_?
MIN.
PRE-WASH
sx.) OF
CEMENT, WITH //~h~ ~,/.7~-
ADDITIVES.
'~/4 ~ ~ ~./~ ~-= HRS. THICK TIm~.
. ././// ~LS. o~ ./~, ~. ~~ ~
STATED MIXING CEMENT AT Y~_~ HRS.
AT A RATE ~F ~- BPM AND ~oO
PSI. DISPLACED AT A RATE
OF
~P~ AN~
PSI. C.I.P. AT./~I~ HRS.
DRILLPIPE WAS WET/DRY AFTER DISPLACING. PULLED
STANDS OF PIPE,
AND WAS OUT OF CALCULATED CEMENT TOP AT ,, . / ~.P.~3 HRS. PULLED DRILLPIPE TO
/~/, .~.. /~ ' AND .FZ~:p~/3 ' .~.. '/.~3.,,/~T/z_--D ~Z~_'-Z3_ . WAIT ON CEMENT
.tA~ .~,z_= ~s.
COMMENTS:
Attach: Cementers Job Summary
Pressure Charts
Other Contractor's Job Summarie~
CEMENTING SUMMARY
PLUG JOB ~
WELL ~./~,j ~L~_.~ ~=~5 DATE ,~.//--
RIG ~ ~3tJ~ ~ O ~". . ..... , ~ST CASING
//~ ~ ~ ', DRILLED DEPTH Il'. ~& 5 .. ', HOLE SIZE_
PPG. PURPOSE OF PLUG
REQUIRED PLUG LENGTH: FROM'..~/ ~_~p _~- ' UP TO ~.0~
CALCULATED CEMENT VOLUME: /~t'~ _ CU. FT. ( ,~)
~CESS, TOTAL C~ENT USED WAS ~~ CU.FT. (
WITH OPEN' E~ DRILL PIPE AT /~~~.~ ' , CIRCUITED
PUMPED _.
-.
AHEAD. MIXED AND PUMPED
DISPLACED CEMENT WITH
II
,
'(,, fTC"/ ').
sx.) + 7.
sx.).
MIN.
PRE-WASH
CU. FT. ( _ ~ SX.) 0r
CEMENT, WITH ~
HRS. THICK TIME.
ADDITIVES.
STARTED MIXING CEMENT AT /~)_~'_Z../ ~' HRS.
AT A RATE OF ~l BPM AND .~ 6)6.~ ,
I
PSI. DISPLACED AT A RATE
PSI. C.I.P. AT~_~_HRS.
DRILLPIPE WAS WET/DRY AFTER DISPLACING. PULLED
STANDS OF PIPE,
AND WAS OUT OF CALCULATED CEMENT TOP AT _/~~
HRS. PULLED DRILLPIPE TO
WAIT ON CEMENT
HRS.
COMMENTS:
.._ _.,~_ ' ~_ c-re .~ _~ .~ ;~;t~ ~ ~ ~ ~. ,... ~, ~ ~~ '
Attach: Cementers Job Summary ~
Pressure Charts
Other Contractor's job Summaries
CEMENTING SUMMARY
,,
PLUG JOB~
REQUIRED PLUG LENGTH: FROM
CALCULATED CEMENT VOLUME:
.~zO sx.) + z
~ ~ sx.>.
,~ t~ MIN.
~~f2 ' uP TO
~,,0 CU.m:. (
· EXCESS, TOTAL CEMENT USED WAS . ~/d~; CU.FT. (
WITH OPEN END DRILL PIPE AT' ~', CIRCULATED
AHEAD. . MIXED AND PUMPED
~r~ CU.FT. (_ . ~O
PRE-WASH
SX. ) OF
C~M~N~:, wH~/~~ ~;/~-
DISPLACED CEMENT WITH
ADDITIVES.
PPG ... ~'~ ~ / .~. 7"' HRS. THICK TIME.
STA~:~ mxBi~ C~.~T AT
HRS.
.AT A RATE OF -. 2~ . BPM AND
oF ~ BP~ AN~ ~ Or..)
PSI. DISPLACED AT A RATE
PSI. C.I.P. AT--HRS.
DRILLPIPE WAS--WET/DRY AFTER DISPLACING. PULLED ... +
.STANDS OF PIPE,
AND WAS OUT OF CALCULATED CEMENT TOP AT ~?/~ HRS. PULLED DRILLPIPE TO
~,/,t/,,..,,~ ' AND ,~..,~-~/~"~,~.~r.. ~). C/'~-_C ~.~I.~.-Z.-/.,,.-.- . · WAIT ON CEMENT
HRS.
Attach: Cementers Job SUmmary
Pressure Charts
Other Contractor's Job Summaries
CEMENTING SUMMARY
PLUG JOB 4
., LAST CASING
. ~/~/~ ~ . ', .DRILLED' DEPTH //~_~ ~'~ ', HOLE SIZE.
MUD WT. /~, ~_ PPG. PURPOSE OF PLUG ....
f!
REQUIRED PLUG LENGTH: FROM' ~~ ' UP-TO ~,~g,_.~,~"~ ' (
CALCULATED CEMENT'VOLUME:
EXCESS, TOTAL CEMENT USED WAS
WITH OPEN END DRILL PIPE AT ~. g ~ ..
PUMPED ....... ~
AHEAD. MIXED AND PUMPED .
~ co.~T. ~ ._~_~ sx.) +
', CIRCULATED ~
~LS. o~ //~
,).
SX.).
MIN.
PRE-WASH
CO.~T. (, ~~ sx.: os
CEMENT., WITH ~'~,~_._).~. / ~
.... j.~? ~ PPG ~ HRS. THICK TIME.
DISPLACED CEMENT WITH ~ ~ BBLS. OF_ /~, ~ p{~.~..-.. ,~,,'"~?_~,,J ~) .
STARTS.,: ~Xn~ C~'~ENT AT ~~..~ ,~S.
AT A RATE OF ~ BPM AND ~~ PSI. DISPLACED AT A RATE
OF 5 BPM AND .. ,~'~ .~ PSI. C.I.P. AT 0100 H~s.
DRILLPIPE WAS~DRY AFTER DISPLACING. PULLED. , ~ , STANDS OF PIPE,
AND WAS OUT OF CALCULATED CEMENT TOP AT ~ 1/~ HRS. PULLED DRILLPIPE TO
· WAIT ON CEMENT
_ _. _~ HRS.
COMMENTS: ~ , ..
., .x~ ~.~~,.~~,-:.'-i_ - .... , ~'" -
,,,, . 1,~ ,, '~ -- --
Attach: Cementers Job Summary
Pressure Charts.
Other contractor's Job Summaries
CEMENTING SUMMARY
PLUG JOB ~
, //~ ~ ~ '~, DRILLED DEPTH .~
MUD WT. ~ ~ PPG. PURPOSE OF PLUG
REQUIRED PLUG LENGTH: FROM.
CALCULATED CEMENT VOLUME:' ,, ,~ ~_~ CU.FT. ( .... .~~ ' ... SX.) +
,).
EXCESS, TOTAL CEMENT USED WAS
CU.FT. (
WITH OPEN END' DRILL PIPE AT,,
' CIRCULATED
PUMPED ~'_ BBLS. OF
·
CU.FT. (
SX.).
MIN.
PRE-WASH
, _~_z~_ Sx.) o~ ,
CEMENT, WITH
ADDITIVES.
DISPLACED CEMENT WITH
PPG
STARTED MIXING CEMENT AT
HRS.
AT A RATE OF '~ BPM AND '~_~
or _g- ..... ~PM A~m.
DRILLPIPE WAS~RY ~TER DISP~CING. PULL~
~ WAS OUT OF CALC~AT~ C~T TOP AT
PSI. DISPLACED AT A RATE
PSI. C.I.P. Al' ~HRS.
?- STANDS OF PIPE,
HRS. PULLED DRILLPIPE TO
HRS.
· ~;AIT ON CEMENT
Attach: Cementers Job Summary
Pressure Charts
Other Contractor's Job Summaries
CEMENTING SUMMARY
PLUG J oB.~'~
REQUIRED. PLUG 'LENGTH:' FROM ~.~F~ _..' UP TO
CALCULATED CEMENT VOLUME:' .~~ ~ _CU.FT. (
.#
'~c~ sx.) +
·
7/3 ').
-EXCESS, TOTAL CEMENT USED WAS
CU.FT. (
· sx.).
WITH OPEN END DRILL PIPE AT _,,.~t~.'~'O ', CIRCULATED
PUMPED ... /~. BBLS. OF .~ /~'.,~ ...~.
·
A~D. ~LXr. D AND P~~ ~..~, ~ cu.~T. (,,
MIN.
PRE-WASH
sx. ) or
ADDITIVES.
· /Z_ ~ PPG -'~
DISPLACED CEMENT WITH ~
~...~m,~.°~=... HRS. THICK TIME.
,~LS. o,, ~- ~ ..... ~) .. ;-/~..~..
--
STARTED MIXING CEMENT AT
HRS.
AT A RATE OF
or ~
~-- BPM AND __.~, ,~')
/
.BPM AND
PSI. DISPLACED AT A RATE '
PSI. C.I.P. AT'~HRS.
DRILLPIPE WAS WET/DRY AFTER DISPLACING. PULLED
STANDS OF PIPE,
AND WAS OUT OF CALCULATED CEMENT TOP AT _,/~,~--~ __ BRS. PULLED' DRILLP'IPE TO
_~~~ ' AND WAIT 01[ CEMENT
~ HRS. .
COMMENTS:
Attach: Cementers Job Summary
Pressure Charts
Other Contractor's Job Summaries
'x
'x
:/
-. /
.. /
'tlr
/
/
/
/
/
/
/
f
...)
/'
ALASKA OIL ~D GAS CONSERVATION COMMISSION
Hoy le H. Hamilto~
Chairman
Thru~ Lonnie C. Smith//O~
Commis s ioner
Doug Amos
Petroleum Inspector
April 21, 19 81
Witness Suspension of
SOHIO ' S SAG DELTA # 5
Sec. 36, T12N, R15E, UPM
Permit #80-129.
Friday April_. 10,..198~: I departed my residence at 3,30 pm for a
5:00 pm¥~depa~ure on Wien flight #75, arriving at Deadhorse at
8~00 pm.
When I arrived at the location plug %1 had already been pumped.
A 7" Howco E-Z 4~ili cement retainer had been set, with a wire
line unit, at 10,700 ft., 18 ft. above perforation interval
10,770'-10,718'. A 3000 psi test was conducted with the rig
pumps for 30 minutes. Plug No. I consisting of 50 sx Class
cement at 16.0 ppg, ~s placed on top of the retainer and calcu-
lated to ex~end to~-~0~413'.
Saturday_. April-11, 198~1.~ At 4,30 am a second 7" Howco E-Z drill
re. tainer was set wit~~ drill pipe at 10,095', 135' above perfora-
tion interval 10,26~-10,230'. The retainer was pressure tested
as before. Plug No. 2 was placed on top of the retainer and has
a calculated top at 9,808'. Plug No. 2 consisted'of 50 sx Class
"G" cement at 16.0 pp~
Sunday April 1.2, 1981, At 6,30 am Plug No. 3 was placed from
9,080'-8'910'. Plug' No. 3 was a balanced plug of 50 sx Class
"G" cement at 16.0 ppg. This plug was set across the liner lap
and extended 70' inside 7" csg and 50' inside 9 5/8" casing. A
9 5/8" E-Z drill retainer tested to 3000 psi was set at 8,800'.
Two attempts were made to place Plug No. 4, both attempts were
with 50 sx Permafrost "C" cement. The first plug was pumped
with the hole full of 10.2 ppg mud. Upon RIH to tag top of plug
no cement could be found, the hole was circulated clean and turn
over to 9.8 ppg CaC19 and another 50-sx Permafrost "C# plug was
pumped. After WOC ~or 8 hours, RI~ to tag cement, no hard
cement could be found. The hole was reversed out and approxi-
mately 10 sx soft cement was reversed out. The third attempt
was with 50 sx of 16.0 ppg Class "G" cement. This plug was a
balanced plug placed from 2,650' and tagged with 10,000# at
2,560' .
No one at the location could give an explanation as to why the
Permafrost cement would not set up. The last 2,560' of the hole
was changed over from 10.2 ppg mud to 9.8 ppg CaCl2.
~ril ~1, 1981
In summary, I witnessed the suspension of SOBIO'S SAG DELTA NO.
$. Plug NO. 4 was-placed after 2 attempts failed using $0 sx of
Permafrost #C' cement. Attached to this report are copies of
Sohio~s ce~e.nti..summary and copies of the charts used to record
the 3,0009 pressure test on the ?' and 9 $/8' E-Z dr~l! re-
SOHIO ALASKA PETROLEUM COMPANY
April 14, 1981
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAI L: POUCH 6-612
ANCHORAGE, ALASKA 99502
CONFID~~
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. H. H. Hamilton
Gentlemen:
sag Delta ~5
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of March, 1981.
RHR:ja
Enclosures
cc: Well File 917
Yours very truly,
R. H. Reiley
District Drilling Engineer
RECEIVED
APR 1 5 1981
Alaska Oil & Gas Oon,$. Oomml~sion
Anchorage
STATE OF ALASKA
~ ALASK~"'~,,,IL AND GAS CONSERVATION ~MISSION
MONTHLY REPOR't JF DRILLING AND WOhKOVER OPERATIONS
· Drilling well ~
Name of operator
Sohio Alaska Petroleum Company ..
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of Well
at surface 2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
= 39.32' AMSL ADL 34630
7. Permit No.
80-129
8. APl Number
50- 029-20527
9. Unit or Lease Name
10. Well No.
Sag Delta ~5 (36-12-15)
11. Field and Pool
Wildcat (exploration)
For the MOnth of. March , 19 81
,12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Depth at month-end: 11063 '
Footage drilled: 1526 '
13. Casing or liner run and quantities of cement, results of pressure tests
Ran 51 jts. 7" 29~ L-80 Buttress liner to 11063'.
cement.
Cemented with 720 cu. ft. Class G
14. Coring resume and brief description
Cut a total of 14 cores from 9815' to 10819'.
Cut 18 sidewall san~ples from 10040' to 11020'.
Total cut 614 5' recovered 512.5'
RECEIVED
15. Logs run and depth where run
CBL @ 9480 '
DIL/BHCS @ 11063'
FDC/CNL/Cal/GR @ 11063'
ML/PL/Cal @ 11063'
HlYr @ 11063' APF~ 1 5 1981
RF2 @ 11063 '
Velocity survey @ 11063 ~laska 0il & Gas Cons. Commission'
Anchorage
!~? 6. DST data, perforating data, shows of H2S; miscellaneous data
At month-end, just completed cementing liner.
CONFIDENTIAL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ %_g_.~v~,~.~ _ T,TLE Districts,GNED' L) v ~ Drilling Enginee~ATE'q - ~ ~ -g%
NOTE--Report on this form is required for each calendar month regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
Rev. 7-1-80
SOHIO ALASKA PETROLEUM COMPANY
Alaska Oil & Cas Conservation Cc~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
3111 "C" STREET
TELEPHONE (907) 265-~0~.
MAIL' POUCH 6-61~'~ '
ANCHORAGE, ALASKA
~ril 8,
Gentlemen:
'Well 'Sag, 'Delta '#5
Enclosed, in triplicate, is Form 10-403, Sundry Notice and
Reports on Wells, for the above~ well. This report
contains our proposal to suspend the well.
Yours very truly,
District Drilling Engineer
encs
cc:
Well File #17
CONFIDENTIAL
RECEIVED
APR - 9 198]
Alaska Oil & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASK/'%IL AND GAS CONSERVATION £, jMMISSION
SU , DRY NOTICES AND REPORTS ON WELLS
DRILLING WELL
2. Name of Operator
Sohio Alaska Petro'leum ~y
3. Address
Pouch 6-612, Anchorage, Alaska
4. Location of Well
At Surface:
99502
~"U~'~ 8. APl Number
5o- 029-2052?
2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 39.32'
I 6
. Lease Designation and Serial No.
' ADL 34630
9. Unit or Lease Name
10. Well Number
Sag Delta #5
11. Field and Pool
Wildcat (Exploration)
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate)
Perforate F'I Alter Casing [] -, Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other Suspend ~ Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
[] Altering Casing []
[] Abandonment r-I
[] Other , []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Estimated completion of well testing is April 9, 1981. Kill well by circula~ing through
test string. Lay. 50 sacks Class G Cement with18% salt on top of 7" EZ Drill retainer
set at 10700' MD (18" above perforated interval 10770' - 10718'). Set 7" EZ Drill
retainer at ± 10196'MD (34' above perforated interval 10260' - 1023 ' MD). Lay 50 sacks
Class G c6~aent with 18% salt on top of retainer. With 10.3 ppg mud in hole, place a
50-sackbalancedplug across liner lap from 9080' to 8910' MD (50' inside 7" liner
and 120' inside 9 5/8"). Set 9 5/8" EZ D~ill retainer at 8800' MD.
Lay a 50-sack Arcticset I balanced cement plug from 2650' to 2537' MD. Change top
2537' of w~ll over to 9.8 ppg CaCl2 . Pull up the hole and change top 100' of well over
to diesel.
Nipple down BOP's. Install 13 5/8" 5000 pSi x 4" 5000 psi adaptor on top of tubing
spool. Install 4" 5000 psi valve plus blind flange on top of adaptor.
/~ /,'~.~
Drain cellar and release rig. RECEIVE1)
~aska 0il & Gas C0n~;.
Anchorage
14. I hereby certi~ct to the best of my knowledge.
Sign TitleDistrict Drilling Engineer
The space below for Commission use ~
Conditions of Approval, if any: :~.~ ?~'~o'.~,~ ""~¥.,,.,,~,~ ~,
Date
4-8-81
By Order of
Approved by ?>>""">~ :~'"/ COMMISSIONER the Commission
Form 10-403
Rev. 7-1-80
Date
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
COt tOl[ ftJ t'
Alaska Oil & Gas Conservation Conm~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
I 1.2 EN~
TELEPHONE (907) 265-0~' ~,
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 9~G~O
~ch
~ ~ ~ s~o~-
~~~
STAT
CONFER~
Gentl~:
'W~',T, 'SAG DELTA '#5 ' (36'12-15)
Enclosed, in duplicate, is Form 10-404, Monthly Report of
Drilling and Workover Operations, for the above-named well
for the month of February 1981.
encs
cc: Well File #17
Yours very_ truly,
R. H. Reiley
District Drilling Engineer
RECEIVED
MAR 1 1 1981
ltlas~ Oil & 8. as Cons. Commission
~chorage
CONFIDENTIAL
' ' STATE OF ALASKA
ALASKA/"~L AND GAS CONSERVATION C('~'MISSION
r4~mT.~.¥ ~EPOFIT OF DRILLING AND WORKOVE_R_~ :~ ~F iATION$
1' Drilling well []
2. Name of operator l~ii~~ Il m,---~ 7. Permit No.
Sohio Alaska Petroleum Company 80-129
3. Addr. ess 8. APl Number
Pouch 6-612, Anchorage, 'Alaska 99502 50-029-20527
4. Location of Well 9. Unit or Lease Name
atsurface 2322' NSL, 727' EWL, Sec. 36, T12N, R15E, UPM -----
10. Well No. ' '
Sag Delta #5 (36-12-15)
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Wildcat. (Explorat±on)
:[4]3]3 = 39.32' ARS:[,I ADT. 34630
For the Month of. Febrt~ ,19 8].
· 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
DeDt_h at. month e~d: 9537'
Footage clr±].].ed : 9537'
Spud ~a].]. at 1200 hom:s 2-3-8]..
13. Casing or liner run and quantities of cement, results of pressur9 tests ~ 68 jtSo 13 3/8" 72# T,-80 B~tt~ess casJ~ag to
2728'; ca~.nted w±th 3488 cu.ft, Pez~afrost TI cement. Tested casing to 3000 ps± at 2674'
Ran leakoff test at 2750' to .66 psi/ft gradient. Ran 248 ,jts. 9 5/8" 47# L-8~/S0095 Cas~.~
to 9520'; cemented in two stages: First with 1322 cu.ft. Class G; second stage through D.~
packer at 2600' with 130 cu. ft. Permafrost C preceded by Arctic Pack. Tested casing at 95[
to 3000 psi, ok. Drilled to 9550", perfoz~ed formation ccmpetency test to 0.7 psi/ft gradis
14. Coring resume and brief description
Ran four sets of 30 samples each CST's from the following intervals:
8700' - 9518'
6254' - 8651'
4723' - 6242'
4999' - 9518 ' *Core Sampling Tool
15. Logs run and depth where run
~./~cs/~/s~/~ - ~-~-' ~ E C E J IrE D
DIL/BHCS/GR/SP/~TI - 9537'
~/Q~/S~/a~ - ~54~.' ~A~ ! ! ]98]
Alaska 0il & Gas Cons. C0mm/~.~joj]
16. DST data, perforating data, shows of H2S, miscellaneous data J~c~JDrag8
,.
CONFIDENTIAL
1?. I hereby certify that the foregoing is true and correct to the best of my knowledge.
NOTE--Report on this form is required for each . adar month, reaardless of the status of (3nP. rntinn~ nncl ri-ill{ti
00'
Oil and Gas Conservation Commission by the 15th o the succeeding month, unless otherwise directed.
Form 10404
Submit in duplicate
Thru~
ALASKA OIL AND GAS CONSERVATION COMMISSION
Hoyle H. Hamilton~
Chairman f.i~.~/t
Lonnie C. Smith //~z
Commissioner ~.
Ben LeNorman ~
Petroleum Inspector
February 23, 1981
B.O.P.E. Test on
SOHIO 'S SAG DELTA #5,
Sec. 36, T12N, R15E, UM
WI L DCAT.
Friday February 6~ 19812 I departed my home at 7:50 am for an
-8-~20 am"$hoWup'a~.~ 9":~-0 am departure via the Sohio charter for
Deadhorse arriving at 10240 am.
saturday._. February 7t ..... !.9.8!: Tests began at 10:45 am but were
suspended at 112'45 am-due to a leaking HCR valve in the kill
line. It was decided to replace the HCR valve with a manually
operated gate valve. Tests resumed at 3:45 pm and were com-
pleted at 5:30 pm. BOPE inspection report is attached.
S~unday F.ebruary 8, ._1_98.!~ Awaiting confirmation of plane reser-
vations.
~gnday FebruarY 9, 1981= I departed Deadhorse at 2530 pm via
Wien flight #6"arri%i'~g in Anchorage at 4500 pm and at my home
at 4:30 pm.
Wednesday February 18, 19812 Ed Lancaster advised both the
CheCk 'valve-"and'-Hc'R"~ai~e had been repaired and retested to 5000
psig.
In summary, I witnessed successful BOPE test on $OHIO'S SAG
DELTA #5.
O&G #4
4/80
~-~
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Inspector
Operator
Location: Sec
Date
Representative
Permit
Casing Set
Drilling Contractor
Location, General , 69/~
Well Sign ~/~
General Housekeeping _~.2~ .
Reserve pi t ~/~
Rig ~/~ ~
Test Pres sure
ACCUMULATOR SYSTEM
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Results: Failures
Full Charge Pres sure .~~"~I) psig
Pressure After Closure /~FJ" . psig
200 psig Above Precharge Attained: min~_~Lsec
Full Charge Pressure Attained: ~ min ~4~ sec
N2 ,D,.I~,. /~-O ~/. psig
Controls: Master
Remote ~/W.. Blinds switch cover/~/~
Choke Manifold
No. Vel ves
No. flanges ~
Adjustable Chokes
Kelly and Floor Safety Valves
Upper Kelly Tes't Pressure
Lower Kelly- Test Pressure
Ball Type Test Pressure
Inside BOP ~/~-- Test Pressure
Test Pressure
Hydrauicaily operated choke
Test Time~F/~ hrs.
days and
Repair or Replacement of failed equipment to be made within
Inspector/Commission office notified.
Distribution
orig. - A0&GCC
CC - Operator
CC - Supervisor Inspector
.
.
~OHI~ SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE,ALASKA
TELEPHONE (907) 265·0000
MAIL: POUCH 6·612
ANCHORAGE, ALASKA 99502
January 6, 1981
fTD
I~O-là~
Mr. Lonnie C. Smith
Commissioner
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Lonnie
Attached is a copy of the Site Plan and Survey Plat for Sag Delta #5
and Proposed Drill Site Topography for Challenge Island Well #1 as
you requested in your letter of December 24, 1980.
Very t:rUtY yours
......""~
SCANNED AUB 0 9 2007·
R. C. Herrera
Alaska Exploration Operations Manager
jm
Attachments
;::::..
l" i:'~
(,.,ï..
# rfi
b ti'
Cory",...
. "¡¡1¡!S8/0f¡
-----.-
.'
10 2J) :>0 40 10 . 2.D '?o 4081
O~ -REI?AK Wc.:.íIOlJT "-A~Eõí WCAílO\,,) 1 ì
I SAG t7E.LTA #5 I -~-4-:::: I
55~~
0'2.. _ I 72.7'
O~ I '?, I ~ I I
04 I nì'r-J ~ I ~-tft.
+ _ -t -Lí'2~ [7~í AI L-
01 I 11,1 t-1 ¡"'IOOO'
O~ I ~ : ' :
íl'2JJ I ~I?E.J U.M.
2"= I MILE:.
--
N
REBAR LOCATION
Y = 5,980,752.47
X = 717,981.84
o
LAT == 70 20'59.938"
o
LONG == 148 13' 48.247"
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS AND AS-
BUILT SURVEY MADE BY ME, AND
THAT ALL DIMENSIONS AND OTHER
DETAILS ARE CORRECT, AS OF:
DATE: 10 /J7 / ~O
. . r' "
hi;L
""'"
_-~ OF A.( '"
;" '\ ...............q~ t..
, !...~ .. *... :.r -,
"" 0 ... . .. '? ,
:.If. l49th \ .. ~
~.~. ....;>}~./Þ......,...):.. J
~. ..«_W~... ~
".'~ ~ \ G.&,AY A. CRENSHAW i ~~
'1 ~~ 'i:í> · 118. 4277·$ .. t:;iI
~ ~.. ..N.~
, ~ ·0. ..... q,
a, '4 ~ ....._..... ~ -
'\{rfSSIOK~\. ~_--
'-",,,....
vERIFIE.D REBAR LOC.A.T 10..... 11-/16/'00
o ~e.VIE.V\J
REV DESCRIPTION
VECO, Inc.
5151 FaùbanJcs Street, Anchor.o., AI....... 99503
Ancboralle: (907)276-2010 Telex: 090·26-374
Kenai: (907)283·7553/283-7554
Prudhoe Bay: (907)659-2533/659-2608
15M t?E.L íA :tt 5
SOHIO ALASKA
PETROLEUM COMPANY
OctOber 24, 1980
Mr. R. H. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Re~ Sag Delta S5 (36-12-15)Wildcat (exploration)
Sohio Alaska Petroleum Company
Permi~ NO. 80-129
Sur. Loc.~ 2322tNSL, 727tEWL, Sec. 36, T12N, R15E, UPM.
Bottomhole Loc.~ i194~SNL, 559~WEL, Sec. 36, T12N, Ri§E
UPM.
Dear Mr. Reiley~
Enclosed is the approved application for permit to drill the
above referenced well.
Well samples and a mud log are required. A directional survey
is required, if avail.able, a tape containing the digitized log
information shall be submitted on all logs for copying except
experimental logs, velocity surveys and dipmeter surveys.
Many rivers in AlaSka and their drainage systems .have been
cla'ssified as important for the spawning' or migration of
anadromous fish. Operations in these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrat~ve Code). Prior to commencing operations
you may be contacted by the Habitat Coordinator~s office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
~lr. a. H. ~etley -2-
Sag Delta %5.
~r 24, 1980
~ ~ AS 38.40, Local Hire Under State Leases, the Alaak~
D~z~mmt of iabO= is betn~ ~_lfted c~ t~e is~ o~ fl~.ts
To a~ us iu.sc~mdu//ng f/eld we=k, we would ~ your
notifytn~ this c~lce within 48 hours after the well is
~. We w0uld also like to be nott~ted so that a
~t~tt~ ~ ~ c~----~ ~ ]~ ~ to witness testir~
In the ~ of ~/mn or ~mckmm~t, please give this
office adequate ~ nott£~~ so that we may have a
Very truly
AI~ Oil
Enclosure
cc: Del~rtment c~ Flab & Game, Habitat Section w/o encl.
D~partmm~ of gnviromen~/ Coraeruation w/o/encl.
Department of Labor; Su~.rvtsor, Labor La~ Om~ltance
Divisio~ w!o encl.
SOHIO ALASKA PETROLEUM COMPANY
October 20, 1980
3111 'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
CONFIDENTIAL
Alaska Oil & Gas Conservation Commission
30.01 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Saq Delta #5
Enclosed are the following documents, in triplicate, along
with our check for $100.00 to cover the permit filing fee.
1. Application for Permit to Drill,
2. Proposed drilling program outline,
3. Surveyor's plat showing well location,
4. Blowout Prevention and Diverter System diagrams.
RHR: ja
Enclosures
CC: Well File #17
N/S Borough
R. C. Herrera
Yours very truly, ~
R.H..Reiley. ;~(~¢, ' - ·
District Drilling Engineer
RECEIVED
An~Jl~rag~
Form 10-401
REV. 9-1-78
TYPE OF WORK
SUBMIT I1 !LICATE
(Other in~ ,OhS on
reverse s~te)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL OR DEEPEN
la.
DRILL [] DEEPEN [~
b. TYPE OF WELL
OIL GAS SINGLE MULTIPLE r--I
WELL [] WELL [] O~HER Wildcat ZONE [] ZONE
2. NAME OF OPERATOR
Sohio Alaska Petroleum Company
3. ~DRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL At surface
2322' NSL, 727' EW:L, Sec. 36, T12N, R15E, UPM
At proposed prod. zone
1194' SNL, 559' WEL, Sec. 36, T12N, R15E,' UPM
13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE*
12 miles ~E: of Deadhorse
CONFIDENTIAL
50-029-20527
6. LEASE DESIGNATION AND SERIAL NO.
ADL 34630
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9,WELL NO.
Sag Delta ~5 (36-12-15)
10. FIELD AND POOL, OR WILDCAT
Wildcat (Exploration)
11. SEC., T., R., M., (BOTTOM
HOLE OBJECTIVE)
Sec. 36t T12Nt R15Ee UPM
12.
14. BOND INFORMATION:
TYPE Blanket Surety and/or No.
Safeco Insurance Co. 2975387 Amount
$200,000.00
15. DISTANCE FROM PROPOSED *
LOCATION TO NEAREST
PROPERTY OR LEASE LINE, FT.
(Also to nearest drig, unit, if any)
2322' north
of ADL 28320
18. DISTANCE FROM PROPOSED LOCATION
TO NEAREST WELL DRILLING, COMPLETED,
OR APPLIED FOR, FT.
4883' from Niakuk lA
21. ELEVATIONS (Show whether DF, RT, CR, etc.)
eSt. 33' KB above AMSL
23.
lT l6.
No. OF ACRES IN LEASE
None
19. PROPOSED DEPTH
arget: 9030 ' TVD, 10560 '
.I~ 10030 ' TVD, 11560'MD
PROPOSED CASING AND CEMENTING PROGRAM
17. NO:ACRES ASSIGNED
TO THIS WELL
None
20. ROTARY OR CABLE TOOLS
Rotary
22. APPROX. DATE WORK WILL START
January 12_. 198]
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEPTH Quantity of cement
26" 20" 94# H-40 120'BKB 200 cu.ft.
,
17 1/2" 13 3/8" 72# L-80 2700'biD 4500 cu.ft. Permafrost II
12 1/4" 9 5/8" 47# L-80/SoogiL* 10010'1~ 2340 cu,ft.ClassG;130cu.ft. PFC
8 1/2" 7" 29# L-80 l1560'MD 380 cu.ft. Class G w/18% salt
* L-80/Soo-95 xover 9300'TVD
RECEIVED
See attached proposed drilling program outline.
0GT g 1 I980
~as~m 0il & Gas Cons, Cornmlsslor~
,
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal is to deepen give data on present productive zone and proposed
new productive z_O.l~.[f proposal is to drill or deepen directionally, give pertinent data on subsurface locations and measured and true
v~tical del~ve'l~l~out preventer program.
24. I hereby certi~~gt~Tr~d Corr~ /0/,~ k District
vV~, ' '", ~'~ F~, TITLE Drillinq Enqineer
SIGNED DATE ! _ --
(This space for State office use)
SAMPLES AND CORE CHIPS REQUIRED IMUD LOG
Z~s [] NO [ ~I YES [] NO
DIRECTIONAL SURVEY REQUIRED
~YES [] NO
CONDITIONS OF APPROVAL, IF ANY:
OTHER REQUIREMENTS:
A.P.I. NUMERICAL CODE
PERMIT NO. ~" 0 '- / ~ APPROVAL DATE
¢/ -/ ' *See Instruction On Reverse ~,u~
~Y 'OROER OF THE COMMISSION
Qc~d0er ~, %~Q
DATE 10/24/80
PROPOSED DRILLING PROGRAM OUTLINE
SAG DELTA 95
CONFIDENtiaL
1. Mobilize rig to the Sag Delta #5 island via ice road.
2. Install and function test 20" x 2000 psi diverter system.
3. Drill 17 1/2" hole vertically to 2700'.
4. Run open hole logs.
5. Run and cement 13 3/8" casing to surface.
6. Nipple down diverter system. Install and test 13 5/8" x 5000 psi BOP
stack. Maximum BHP at target (9030') is 4398 psi based on Niakuk 2A
test information. Maximum wellhead pressure is 3354 psi assuming
0.116 psi/ft, gas gradient.
7. Drill 12 1/4" hole directionally to 8488' TVD.
8. Run open hole logs.
9. Run and cement 9 5/8" casing in two stages with Arctic Pack placed
inside 13 3/8" x 9 5/8" annulus.
10. Drill 8 1/2" hole to 10030' TVD or 100' into basement. Cores will be
cut as necessary in reservoir rocks.
11. Run open hole logs.
12. Run and cement 7" liner.
13. Clean out well to PBTD and run cased hole logs.
14. DST test as required.
15. Complete with tubing, production packer, and tailpipe assembly with
landing nipples. Nipple up and test Xmas tree.
16. Secure well and release rig.
17. Mobilize back to Prudhoe Bay Unit.
DMS: j a
10/16/80
RECEIVED
GROUND LEVEL
FLO~JINE
DRILLING
RISER
ANNULAR PREVENTOR
10-3/4" ICYDRAItAIC
CONTROL BUTTERFLY
10" ."
DIVERTER
12" MAX.
DRILLING
SPOOL
DIVERTER SYSTE}i DETAIL
DRILL. DEPT. MARCH 1980
20"
CONDUCTOR
PIPE
NOTE:
RECEIVED
·
DIVERTER LINE HAS
TWO DIRECTION DISCHARGE
CAPABILITY AFTER LEAVING
RIG SUB-BASES.
-F
ANNULAR
PREVENTER-
2 9/16" K I L L L! N E
CHECK 'GATE GATE
I
I I
.I 1
PIPE 'RAMS
1
-t
1
BLIND RAMS
5000#
5OOO#
DRILLING
SPOOL
I I
PIPE RAMS
I
4 I/IG"CHOKE LINE
GATE H.C.R..
_
L~
5ooo~
RECEIVED
~o ~o ~ .o ~o zo ~o .oI ,
I
~ ~bT~ 5 55
o~
I
O~ , , ,
TI I ~ I"-1~o'
TIZH, U.M.
REBAR LOCATION
X = 5,980,752.~7
Y = 717,981.8~
LAT = 70°20~59.938"
LOSG = 1~8°13'~8.
I HE.BY CERTI~ THAT I
PROPERLY ~GISTE~D ~D LICENSED
TO P~CTICE L~D SURVEYING IN ~.~~~.
THE STATE 0F ALASKA ~D THAT ~ ~C~ [~/ "
T~s PLAT RE~SENTS ~D AS- '~;~_ n,. ,2,.s /_~
BUILT SURVEY ~DE BY ~ ~D
THAT ~L DI~NSIONS ~D OTHER
DETAILS A~ COR~CT, AS OF:
DATE: I O /17 j/ ~
I
I
0 ~gv~E~
REV DESCRIPTIONALASKA
~o,,~.: (~-~0~0 ~.': o~-~-~, PETROLEUM COM~NY
[eaai: (~7)2~-75~/2~-75~
P~oe ~ay: (~659-2~1659-2~
I~ I I
CHECK LIST FOR Nk~W WELL PERMITS
Item Date
(1) Fee
Approve
/
¥,
(2) LOC.
(3) t~lmin. <:'~¢,~.
Company
1. Is the permit fee attaChed .........................................
2. Is ~11 to be located in a defined pool .........
Yes
3. Is a registered sur~ey plat attached ...............................
4. Is roll lcx2ated proper distance rrm property lin ....
5. Is roll lc~a~ proper distance frcra otlaor rolls ....................
6. Is sufficient undedicated acreage available in this pool ............
7. Is ~11 to be deviated ..............................................
8. Is operator the only affected party .................................
/
9. Can permit be approved before ten-day wait ....
.
10. Does operator have a bond in force ......... ' .~/,,~,~'"
~'11. Is a conservation order needed ................................. ....
(4) Cas~~
12. Is administrative approval needed ...................................
No
13 Is conductor string provided ·
14. Is enough ceraent used to circula~ on conductor and surface ........
/0//;~/~'0 15. Will cement tie in surface and intermediate or production strings ...~.~~'
/ · '~'" 16 Wii1 cormnt cover all known productive horizons ...................
17. Will surface casing protect fresh water zones .......................
18. Will all casing give adequate safety in collapse, tension and burst.
/0~~ 19. Does BOPE have sufficient pressure rating-Test to ~O psig ..~
~, Approval t~_=ccmmanded:
Lease & Wel 1 NO. ~ [")¢.X/~
Re,ma~ ·
Additional Requirements:
Geology: Engineering:
rev: 03/05/80
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPE .N. DIXi
No special'effort has been made to chronologically
organize this category of information.
[,VP 009.;E02 VERIFiCATION LiiSTIikG
** REI~.6 HEADER **
SERVICE ~AME :SERVIC
DATE :81/05/ 7
ORIG1 ~ :
Ri~EL NAME :R~EL ID
CUNTi~UATION ~ :C1
P~EV lOOM RECL :
COMM~i~'I'S :RfEL CO,MENlO
*~ TAPE HEAOER **
SERVICE NAME :SEMV1C
DATE :81/05/ 1
'I'A P E NAME :
CONTINU~fflON # 101
PAEVIUU8 TAXI :
COMMENTS :T%PC 2~MENT6
EOF
*~' ~'iLE HEADER **
FILE NAME :~8ERViO.0¢I
E NA~...., .
YE:RSION ~ ~
DATE :
MAX1MUM LENGTH -: I024
~ ILE TYPE :
PREV IOUS F..I b~
** I~FORMATI:O'N REC'OROS' **
MNEM CO,TENT8
LNIT IYPE CAiE S ZE' CODE
w9 : ~SAG OELT/~
F N : WI b DCAT
RANG: 15~
TOWN:<: :l:2N
SECT:
C 0 UI~:- <N, SLOPE
STAT: ALASKA
CTRY:
000:
000::' :'010 065
MN:EM :: CON'I~ENTS
imm, ii i i i i I i ~mm~ mm~
PRES: DibOO1F'
000 000 007 065
** R:ECORD~.Ty~::047:,,:.~i~: ::
** RECOR:D'. TYP,E :':047;'::**
LVP 009.H02 VERIP~iCATI{JN LISTING
PAGE
** RECOP,[) TSPk 097 **
OiL ~UN ~ 4, LOGG~.D
CASING LL)GG ~,R
= 13.37 IN. @ 2'128 FT.
BlT SIZE : 8.50
FLUID IN T~E hOlJf : GEL/X-,C POLY
DENS : 10.2
VISC = ;~ 1.00
P~ = 9.50
~'LUID bUSS : ~.~ JEO Mb
RM Ca M~AS TEMP. : 1.3~ ~ 50 F
RMF " " : 1.'10 8 65 F
RMC " " : 1.91 Ia 65 F
POROSITY ~A.T~iX : LI~ESTONf
fINAL RO~ ~OR ~L
~'HIS ~ ROm 4 RERGED %~i'I'h RUN ~1,2 ~ 3
~,~'::DA:I"A FORNAI' RECORD-*~*
ENTRY ELOCi{S
TYPE :: . ~IZE :-'; ':': BEP~::':(.:DD:E
4 1 66
8 4 :"73:
9 4 65
0 i<,:~ ' ,: 6:6
MNEM SER~tiC~ SERVIC£ uJ:iiT API AP1 .~Pi ~:P:I::':'F:ILE BIZ..: PROCESS SAMPLE. R.~PR
_ 1:'~ ::':':.:O:RD'E~': ~ ,:,:':: LOG'.,:'~:~.PE,':, CL.A::~::::':' M~:D?,::N:O~': b:EV:E.!~ :'CODE
/ b13 F::[~: :: ':':O~':bl:::< :::::':..:0 :':': ,:. :: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: 4:::::,: :' :::.:: 0:, ::1:~: ::,:68
i-LD :: :: ::::(':F:OM"' :: ::::::M:::::>::: :::: 0 ::: ",:. -?::":1:2.:..:':::". :::: 4'6 :>:::::<>:>:::?::::::::::<::::: :::::::(:::::::::4::::: ::,:: :..: :::::<0 :::: :::::: ::::: :':' :.: :::: ::.::1' 68
bVP 009.H02
V ~t4 IF lC ATICI~ LiS~I~ S,
P/%GE
Z GR ulL. .& GAPI 7
DT ~U~ US/E -0
G~ BHC ~ ~ GA~I 60
SP ~ H( q ~ V 60
~ Lb2 MI~ {~ O ~N 0
~ GR MIL ;~ GA~I 0
9 NP~I ~'Om ~ 13 PU 0
;o RmUB- FUN ~ ~q G/C3 0
Ii DRhO ~'ON / [5 G/C3 0
{Z CALl FDi~ ~ ~ IN ~2
~ GR FDN i~ GAPI 42
I{ NRAT f'ON [~ 0
15 NCNL Fbi'~ ~9 0
I~ FCNL FUN ~ 0
~ MqOR~ MPT ~ .......... O}tb~M 0
Iq MINV Mf:'T R3 .................... OH~:g 0
~.o C AL1 MP T aW 1 N 0
1 0 0 0 4 0 1 68
31 32 0 0 4 0 1 $8
52 32 0 0 i 0 1 68
31 32 0 0 4 0 1 58
1 0 0 0 ~ 0 1 68
0 0 0 0 4 0 1 68
0 0 0 0 4 0 1 68
31 32 0 0 4 0 1 68
68 2 O 0 q 0 1 68
35 1 0 0 4 0 1 68
44 0 0 0 4 0 I 68
28 3 0 0 4 0 1 68
3I 32 0 0 4 '( 1 68
42 t 0 0 q 0 1 58
],~ I(. 2 0 0 4 0 1 68
34 93 0 0 4 0 1 68
0 0 .0 0 4 0 i 68
2'6 2 0 0 4 0 1 68
25 2 0 0 4 0 1 68
28 30- 4 0 1 68
DEPT I 1065.500 SFLU
SP
SP
~PHI '99g. 250 ' 'i[:'HOB
GR 999. 250 NRA~f
PROX" : -999',~50 ~.NOR
-999. 250 IbN -)9). 250 ILl] - ~99. 250
':999,2:50 ' :C'~'!' $~),8'750: '":"fir 25.641
'999'250 LBS -999.250 GR -999'250
.~,5 CALl 9:99' 250
25.O.:: D~:O:: ..,
-999.: ~ O' '
.
. 9 ' '~'' '"
999 ..50 NC~.L .999.250 FCNL -999. 50
2
' 999,250 ;:"~?I'NV-:' ~999',' 250: I-'~ ' ' 999- 250
DE'P F'i 1IO 3::'7~ :: 000 G~
SP -98..9~ GR '17,125 DT
25> bhD ~" I '
S P ~ 9:99" ,.-, 4. ,'.50 $ G'R':.:' 'I 9 :. 5:31
NPHI ~0.z73 RHOB 3,248 D~HO -0.014 ~ALI 8,500
~R 2::2':;~88. NRA I:..:' .-' .:: ,:. :": }"~'03::7? ::~.-,.N,~'~:L.':::'::;? ~:'(.~:t; t',:3:l:'O ~:~;.O, 00 ::' :.':: 5.0,:0
PROx . 452 2,799 N:iNV,~'.~ ]].: 2',041 C~[ I 8'253
SP
83.t38 ILD
273.250
D E; P T
SP
,SP
10700.00U SFLLi 10.414 ILg 6.844 ILD 7.500
' 8.
~ 7 ,, 375 GR. '7 i:,.:3]-5 ET :<::. ::' ": :.: :: :'(:iR: , 6'8. 625
(-999.250 bLD 7.35? LLS i0'216;6'R 68.500
bYP 009,~02 VERt~'IcA'rIcI:~ L1STiIX~G PAGE 4
GR 72,75(,!
PRUY. 3 , 72 U
2, ! 97 DHHO
3,0(b NCNb
2,075
O. i 39 CALl- 1 1.753
19~9.000 ,FCNL 617.500
2. 121 CALl 9.330
42. 705 LbS
2. $ ;2 DRHO
I .e37 NCNb
35.9~ 9 ILL] 4 4. Of 3
59.594 GB 33.656
q5.867 6B 25.672
0.044 CALl 8.773
6~36.000 ;fCNL 4~24'.000
~6.~48 CALl 8.758
OEPT 10500.000 8FLU
SP -133,5Oo G~
SP -999.2bo LbO
NPHi 0.049 t~M{J b
GB 17.234 NN~T
P~OX 732,333 aao~
767.5[ 0 iLM
lb.219 DT
1688.1~5 bLS
2 5a ~
0:868 NCNb
75.571 ~INV
6'~,0(0 ILD 511.500
49.594 GR i6.188
1556.000 GR 15.9f4
0,0~4 CIILI 8,914
7312.000 ',F CNL 8248.000
3~.010 C~LI 8.847
DLP'r 10qU0,000 SFLU
SP -120,000 Gl{
5P -999. 250
NPHI 5 ,:225
GR 21.875
PROX 61 · 53I ~NOB
375 I. LN
359
9c. 6 iLLS
5 9 ~ D RH 0
368 NCNb
'7
7 1 M.I.N V
848 'TR. 231625
"0,033 CALl . 8 ~25
5416. 000 ;FCI~i'., 3852 ~~oo
35 · 557 C ALI 8. 647
DEPT
$P
SP
NPHi
PR[}){
:13~ ooo
0.584
.'IS'813N.RAI
31J.0~3
15.43~ DT
' 3562:85'9 !LLS
2.723 D~HO
~"037 ~
62,503 ~IN¥
53'000 'GE 1,7.156
-234": :' GR ::
o
,054 CALl
759:2:.',0'(0 '~::'C~b ::6. S52 ooo
30,009 C~.L1 9
DE, PT 1020u,000 ~FLo
SP: '1:2.3;43~GR
P -999.250 bhg
PRO×
't 3. 063 ILN 2'~, 391 ILD
23"' 109 D.~',:: :,::": 55, ~:88':~. GA
54,409 LLS .64. 223 (ia'
.i53 NCNb 5812~000 ',F C~ I,
3"6'~: 865':. ~: ::": :M~ I :NV ~: :-'<': :<<:: ':~:::2:~.~': ~ 3 7.::
45,4(9
21,500
33.844
9 :~ 6:'69
DEP~
SP
SP
NP~i
GR
PRO~
~:~.: 0. 2,50 IL::
27. 625 D~
:1 .:.31 i:,' :.NCNb
i
. '656 ~ I, t,~ v
0,'044 C~L:I .21
0:8.0 0:0: :'. :~::C:~ L: .: 4324. O00
29,375 C~Li 9.253
,'; 2. 938
21,;..,69 ' D~.
.3,.2 bLS
t .546 NCNL
47.7 ~ 1 1 LD
591' 2,00'0 :PC~
L
:: :::::: 7 ,;:'39 7 '. C :A L I!
55,~!
,2.56 3
9.018
9. 969
.3548.0oo
9 '7 24
DEPT
SP
-154.250 GA 21.422
7'78i'
L'vP 009,ii:02 Vt&[~IF'I. CATi(]i~ hiST].!I~G
5?{ -999.250 bbb
NPH1 2.63'; R~UB
GR 19.~91 NRAI
PROX 2~5.8~3 MNO~
208.406 bLS 21g.250
2.586 DP, I'~O 0.006 CALl
1.338 NCNL 0984.000
,16.388 MINt/ 8.794 CALl
16.797
10.438
5012.000
10.196
DEPT 9800.000
SP -12S,333 GR
SP -999,250
~PH1 34.717
GR 153,000
7.102 ILM 5.207 II, D
144.625 E1' :~3.188 'TR
7.374 LLS 7.030 GR
2.484 DR}{O 0.~09 CALl
3.63~ NCNL 2029.000 FCNL
~.323 ~IN~ ~.237 CALI
5.141
159.000
168.750
15.328
509.500
14.250
DEFT 9700.0o0 SFLD
8P -123.500 GR
SF -999.250 bbb
~PHi 28.359 ~FH(B
GR lb1.750
PRUX 56.29~ MNO~
61.250 ILM 1~.325 ILD
153.000 £T :[5.750 6R
47.217 LL5 54.010 G~
2.436 DRBO 0.093 CALl
3.1~7 NCNL 19'97.000 FCNL
,~6.401 ~]NV 10.440 CALl
21.672
157.875
174.125
11.664
634.000
11.435
DEPT 9bO0.O00 SFLU
SP -134.500 GR
SP -999,250 LLD
NP}tl RMOD
GR NRA~
PHOX 12.090 ahC~
..5oo
2.502
3.08.~ ,N:CNL : 0,000
1.85~ ~iikv 1.339C~tI.
328
4 :ooo
148 375
131961
598'500
13.056
DEPT
SP
~ PHi
GR
PRO]{
9500.0()o SFLU
"'19-750: GR
-i9.750 LbD
1 {>4. 000 NRAT
i3i8~'6"' MN:OR : '' "::
5.905
! 6,2'5
981375
12.35:9
737.000
9 ~' 236
SP -17.312 GR
S'P :' ":I'7" 3t::2~: L:b:D
NP~i 33.301 RHOB
GR 1::10 25:0 :~ RA,:I;'.',.
PROX -'999:250 MNOR
14~"-750336 .:.::E,i,:IL'M ;'c~'.375-' ~G11':'14~81 :IRL[):: 146.7501~' 2,975
2.5, <.:L'L..~:::.:: .?999 .'250 ::: G:R::: ' 0
:438 ~,HO O' 0'00 CALl 1.2'391
.250 NI};V "999.250 CALl - 99.250
DEP~[ 9300.00o 6FbU 4.37 ~ IbM
SP
NPHi
GR
PROX
-22.7i~1 LLD
:"' 8 ' ' ' ' ' ' ~' '~' ' *: : ' :
2, ~t~7 RHi,J~.' .:. :.':'2,:4~
164.875 NaAT 32156 NCNL
~, · .. :e ,. , ~ : .
,999 0: OB:: . ~999; '250::::' :.M:I:N~:': :,:
SP
SP
NPHi
PROA
'15. :7.I':9 LbO
26.3'e7
1.2~,. 750' NRAI
'999,2;50 MNOR
9'9 ."250' LL6:
2
'4,28 g R, ti'O
3:. ·
· 75 0
:: '.::':.:999, Z5::O :' G <:.
0
.015 CALl
" 99. ..50 CAI, 1
709-:500
-999,250
DEPT
9100.00(') SFLU
5.688 ILN
3.408' ILl)
3.314
LVP 009.H02 VERIFiCA]iOt~ LISTING
SP -25.5O9 G~
SP -25.b09 bbD
mPnI 33.643 RH(OB
GR lo9.000 NM~I
P~UX -999. 250 MNCR
142.125 DT
-999.~50 Lb8
2.45.1 DFP!O
3.500 NCNL
-999.250 MINV
DgF'i 9000.0(;0
SP -31.250 GR
SP -31.25o
NPMi 28.125 RH{J~
GR 8~.5C0
PBOX -999.250
3.8!~
77.158
-999.250 LL$
2.461 DREO
3.152 ~CNL
-999.250
DEFT 8900.000
SP -36.875 GR
SP -30.875 LLD
NPE1 22.507 RtiO~
GR ,17.b$8 NRa~
PROX -999.250
9.2~1 ILM
57.]~5
-999.250 LLS
2.5~0 DRHO
~.789 NCNL
-999.250 ~lb~V
DLPT 6~00.0u0 8FLU
8P '37-875 GR
NPHI RHO~
GR t~RA~
PRO~ MNO'~
'~. 25~ IL~
59,53~ DT
-99~.250 LL$
2,543 iD.R'HO
2.590 I~CNL
999..2 0 ~IN¥:
DEPT
SP
$P
NPHI
GR
PBOX
8700,O00SFLO
-41.125 GR,
-41.I25 '.LLE
33.8
-999.250
68.438 DT
-999.250' < LbS
g,589 D~hO
~.'7:30,'~v::? NCNL·
-999.250 ~IN~
GR
PRO;('
8~00.000 6FLU
'.42~;500 GR:".
-42.5~0
20:~0'20 RHBB
-999'250 MNOR
?.066
-999. 250 LL$ 2.5:6'8 :< .
2. 639 }[~ CNL
-999'25.07: MI:NV:
DEPT
SP
GR
P R 0 X
8500.000 :SF:LU
-42.406 GR
'-42.406 bt~l;
20.557 RiJOB
-999 2
.,2 !: · NCN,L
25O MiNV
EPT
PHI
8~00.000
'44 '0:'3'1 GR
87.1,88 NRAI
99'9 ;250 MN'QR
4.18 ,q iLIvi
69 ;9:3:8 DT
PAGE
99.188 G5
-999,2~0 GR
0.005 C[I,I
1970.000 ;~C~L
-999.~50 CgI~I
142
-9S9
13
548
-999
.~25
.250
.078
.500
.250
3.303 ID[
92.563 GE
-9S9.250 '(B
0.019 CALl
2344.000 FCNL
-999.250 CALl
3
77
-9~.9
13
691
-999
.105
.188
.250
.578
.500
.250
9.570
86,.000 GP
- 999. 250 GR
O. 016 CALI
272~. O( 0 FCNL
-99 ~. 250 C
9
57
-999
13
927
-~99
.195
.125
.250
.891
.500
.250
'~. 578, ILl)
81. 375 i 6R
-9~9.250 '(~
.. 0 ..014 C ~L l
2926.000 FCNL
999.:z50 C;~LI
9.4£6
59
50
131'90:6
1018.000
-99'9..250
79:375 GR
~9,:25:0 .:~'~R.':
0'043 C~L/
36. :00,0 i ;'~C, ~ L
-999. 250 C~L1
.25:0
.898
9.250
6~' .535
.063
"9.[ 9.2:5.,0 '9~.9,250
0'048 C~L1 16.531
" ~. 'L 972,'500
· :: Z93.!,!" 000: ~
'99~.2'50C~L! -)i299 50
-~9:250 'C~ -~9. 50
16 797
,ooo ~:C~L 857~000
'99 !9: :'250': C'A LI ' 999.25:'0
LVP
SP
SP
BPHI
DEPT
SP
SP
NPNI
SP
NPH!
PRO×
D~PT
SP
SP
GR
PROX
DEPT
8P
PR OX
DEPf~
SP
NPHI
009.N02 VERIFICATION i, 181~iNG
~300.000 8~'LU 4.585 ILM q.723
-45.088 GR 75.063 ET ~4.563 'fir
-45.688 Lbb -999.250 LLS -999.250
22.559 ~FHOm 2.588 DRBO 0.072 CALl
82.312 N~A? 2.883 MC~L 2754.000 FCNL
-999.250 MNOh -999.250 MINV -999.250 CALl
8200.000 SFLU 3.354 ILM 3.531 ILD
-43.469 GR 74.1E~
-43.469 LbO -999.250 LbS -~99.250 G~
23.6~2 ~fl[~ 2.520 DRHO 0.044 CALl
88.750 NRA7 2.965 NCNL 2614.000 f'CNL
-999.~50 ~N6~ -999.250 MIN¥ -999.250 CALl
8100.000 SFLO 4.324 iLN 4.570 ILD
-48.6~5 GR 62.031 DI 90.563 GR
-48.625 66D -999.250 BLS -999.250 GP
~.3~3 RHUW 2.439 DRHO 830'0188 CALl
b/.750 NRA~ 2.801 NCNL 2 .900 FCNL
-999.250 MNOB -999.~0 MI:N~- :-9~9,250 ,CALI
~9oo.~oo
-59.75':0 GR
"9:99.., 2.~ 0
3.240
2
-999.250 LL$
.842 NCNL'
'999,
3.871
.9~':' 9:'~ ~ · 025000
0::3::0: ,'C::
2720. 000 FCNL
~99 :,C i4.'b I.
2o.~(1 RHO~
-999.250 N. N0~
'~:~:5'94 'DT ~'f".000 GR
'9!929 ~ 498 DR'~O 0,0'43 CALl
- 99'~: 2~ 0 S i '~ ,9g'9~'~'5'"0 .... CAI
DEPT 7700. ~)00 SFDU 7.090 1L~ 2,924 ILD
SP ]102,625 6LD -999.250 LLS -909.250 GR
PAGE 7
4.629
75.063
-999.250
17.609
841.500
-999.250
3.467
74.188
-999.250
17.844
782.500
-999.250
4.578
62 031
- g91 5o
14.922
906.900
-9~9.250
-999.250
17.891
937,500
-9~9'250
3.857
-999.250
773.50'0
~999:.250
6~'.0.2:7
.5'94
'99':9:.::25~
18'32
8:0!.500
-9~9'250
2.354
48.344
-999,250
- 9:99.25.0
12 · 1 i7
- , .250
bVP 009.1'~02 VEt~If, ICATION LISTIt~S. PAGE 8
3.916 ]Llv~ 3.9~,9 ILD
63.531 DT 98.188 GP
-999. 250 bLS -9c.g.250 '6R
2.305 DRHO 0.014 CALl
2.908 NCNL 2578.000 FCNL
-999. 250 l¢Ik, V -999. 250 CgLJ
3.820
b3.531
-9c. 9.250
18.703
770.500
-999.250
3.525 Ibl~ 3.738 liE[
68.375 bT 95.1~8 Gl::
-999. 250 LLS -9c. 9. 250
2.443 D[eHO 0.043
3.3~6 NCNL 21~0.000 ;FCNL
-999.250 MINV -99~.250 C~L]
3.744
68.375
-9c. 9.250
18.719
589.500
-~)99.250
4.691 IbM 7.297 ILD
51.344 DT 77.000
-999.250 LL$ ,999.250 GB
041 C I
2.520 DI~HO O. AL
1'919.~' iNCNL :3.348,0(0 FCNL
-999.250 NINV -993.250 C~LI
5.816
51.344
-999.250
17.156
1553.000
{)99.250
DEPT
SP
SP
NP}1I
GR
PROX
~200.000 SFLU
0,555 GR
MN6~
3.514 1LM
59,I56: .D~.
-999.250 LbS
.357 NCNL
999.25 .NIN~V
3.7..52
59':. 155
-9~, 9.250
1'8' 703
577,000
99', '250
D I~ P T 71 00' 000 ,SF L U
SP :0.891 GR
NPitl 28.515 RfiO~
Gl~, 82,375 NRAT.~:
PROX -999.250 MNO~
'8~ ]
0 ?"":9'c' '~ :':9:C,' 9 - 250
'9,9'~.::2'5 . , ,; :2:5'0!: :.'6'.R':
.363 DRHO *022 ClI,] i8.719
'999.2503~:'3"I:4 ~].NV ': ''~:/ 999.25015'8:,0.0'0 FCNLcAL1 -99 ~60~ ~:0500
DEFT
sP
GR 72.5( 0 NRAT
P'ROX:: '9:99..75() :MNOR
'999.250 LLS
.363,:, < '"i:: ii!':BHO
3.547 NCNL
"9;99,-'Z:!:0 MI'NV;>
3.592 ILO
-999'.250 'GR
212'2~000 FCNL
3.650
7::2':-62:5
-999'250
55?.'000
":9199..250
.373 DRHO
. ~,.. 469:25: :'<.>.NCM~NV:N':L
5~'508
'219
-9991'250
'.055CALI 17,797
4.9:3.2.50
.250C~Li ~999,250
SP
GR
68C0.0( 0 SFLB 4.902 ILM
2.688 R qO. :469'":: DT'..'.
-5Z.68'""' '8 66U' -999,250 ' LL8
26;'5I:4' RH[) i:' ;::: ':2' 16::2' :':iD:R:B
60.59~1 NRA~I 3. I 37 NCNL
4.211 'ILO 3.898
I::1.5::~ 3 !' ~ ~ ~
99.250G 9 .469
- .250
.'~0,0'01!:' :CA:L 1 ?17. 188
1332'000' ~CNL 687~5'00
6VF 009.h02 VER~FICAIIb~ LISTIN.;.
PAGE
PR[IX -999. 250 MNC~
-999.250 PINV -999.250 CALl -999.250
D~PT b700.O00
SP -41.438
SP -ql.438
NPhi 28.027 RHO~
G~ 63.156 NRA~
P~OX -999.250
3.32q IL~ 3.639 ILD 3.33B
53.0~4 ~T 102.}88 6~ 53.094
-999.250 bLS -99Q.250 Gh -999.950
2.354 ER~ 0.042 ,(AL1 15.281
3.191 NCNL 2218.000 FCNL 645.000
-999.250 MINV -999.250 CALl -999.250
DEPI 6500.000 SFkb
SP -4e.406 GR
8P -46.406 LSD
NP~I 30.957 RhOB
GR 65.438 NRAT
~RUX -999.250 MNOH
3.684 ibm 3.471 ILD 3.195
~2.469 ET :~6.000 'TB 62.469
-999.250 LbS -999.250 GB -999.250
2.514 gR~O 0.069 .CALl 17.125
3.430 NCNL 2436.000 FCNL 593.000
-999.250 M1N¥ -999.250 CALl -999.250
DEPT 6500.00o
5P -26.828 GR
2.699 Ib~ 2.445 ibp 2.396
53.344 gT 110 000 'fib 53.344
-999,250 LL$ -999~250 GR -999.250
2,340 ~RHO 17.609
3.453 NCNb 555.500
-999.250:i '~'INV '.999,250 'CALl '999.250
$~
BP
NPH1
GA
PROX
28.4(7 RHCR
-999.2~ 0 MN~R
855
99 250
2.164 DRHO I ' 15~844
' ' :3: ~ '2' ,, :: 4: :< 'Neon ~ :~: '::: ~': :~: :': 26.7: 4:'.'0:00 :':' :FC N L 743,500
-9c~9.250 NINV '999.250 CAI, I -999.250
'999:'250 G~ -999. 250
SP '108.81} bi, O -999,250 bLS
NP~I 2 R~:0~ .: '~' ':~:'~':O' I2' 7'89
G~ 42.094 NRAI' 2,891 NCNb 2576'000 FCNL 828,500
PR [] : ~ .", 99 ;9:':; 25 0: .M:N O~,. "-99 ;9::', 2.5: O .¥:: ::::'M~$-N~?' ~' ;~,¥~.~.:.::: ('; :.:? :.~:999~';?~2~5:0':' .::~ :'C A?Lt;': '::.. ," 99-9..25:0
SP -37.312 GR
GR
P i 5f3 ;~ ~6 5 1
b~P 009.H02 VERIFICATION I, ISTI~G
PAGE
GB 27.8~4 ~R~I
PROX -999.250 MNOR
3.361 NCNb 2574.000 ifC~L 702.000
-999.250 MINV -999.250 CALl -999.250
DkPT 5900.000 SFLU
SP -60.000 GR
SP -60.000
NPhI 34.180
GR 40.781
PRDX -999.250
3.639 ILM 2.006 I~[ 1.625
42.375 D~ 113.375 GR 42.375
-999.250 LbS -9~9.250 'TR -9~9.250
2.18~ DRhO 0.021 C~LI 12,914
3.529 NCNb 2312.000 ;FC~L 606.000
-999.250 MIN~ -~9).250 C~LI -)99.250
DEPT 5800.000 SFLU
SP -26.0~3 GR
SM -26.063
NPHI 39.209
G~ 66.500
PROX -999.250
4.273 IbM 3.48~ ILD ~.~3
48.344 DT 111.188 GR 48.]4t
-999.250 bLS -9~9.250 6R -9~9.250
2.30) DRHO 0.067 C~LI 14.148
3.8~1 NCNL 22~2.000 i~CNL 539.500
-999.250 MINV -99~.250 C~LI -~99.250
DEPT -5700.000 SFLU
SP 226.781 GR
SP ,,26.781 bbc
NP}.ii 29.102 RHO~
GR 61;344
PRO~ -999.250
4, 1'C2 ILM ~.5~0 ILD ).082
05.~00 GR 56 250
. 56.25) DT I .
: 999' 250. LLS '9~.9.2510 ~R -9,9.250
21
35'2 DRHO 0.024 C~LI 14.438
3.240 NC: NL, 22:56'000 :~CRL 6~7.000
-999. 250 ~iN V '999. 250 CALl -999' 250
DEPT
SP
SP
NPHI
GR
5600.000 SFLU
4.875
3.773 IbM 3.861 ilI~[ 3.738
.5.7:, :4'3:8 :DT: IIt-3:7:5''GR 57..438
-999,250 LbS -9~. 9. 250 ~TR -9~. 9.250
2, 35'2. DRHO i: O, 1'3,961
3
.344' NCNL 21'04'00'0 ;I~'CNL 578.000:
,,~ ... :: .' ,.: :<. -~ :~ ' .: ~ , . ,~
999,250 MINV ....... 9 9,250, CALl 999.250
SP
SP 71 R~OB
G R:-. ,' :: ::':~ :: :6 7.: '1":8'.8' .": NR'~ T::, ::'>::
PRO;t -999.250 ' MNOR
51,71
1'3,82
695 5:00
-9991250
DEPT 5~00. 000 S~ LU 4. 379
SP~:: :::: GR :65. 4138'
8P 20.563 i~b~ -999.250 LLS
N.P~J.-:: :' 30"9 57 RH:OB,,'.': :..::':.:: :':' ::.2' ~ :::: '"
3, 18
,~ '
9 9.250
4.105
!5 ~ 5'.63' ::::.., ~:R' . ..6:5, q,38
.~50 C-R -9c. 9.250
16.6'41
557. 000
~9:9 9'*':2 50.:: ::: 'C'A L.I :::~': 9:99,2 50
D. EPT<
SP
SP
NPH I
'.21:~:~68:8 · L:~f
32'.129 RH(J5
656 DT
9" 2.50 ':~$:
2,'357 DRHO
1 1. 0 , 0'0 0
0
,02I C~LI
-9~ 9.25.0
15 ~ 766
10
8P
L~'P O09.f~G2 VhRIFICAflON LISTING
PAGE 11
NP~I :21.6~9 ~O~ 2.18~ DRhO 0.0(4 CALl 12.398
GR 47.O00 NRA~ 3.~55 NCNL 2478.000 FCNL 67~.500
PROX -999.250 MNU~ -999.250 MIN~ -9~9.250 ~tAiI -999.250
DkPT 5100.000 SFLb 1.953 IbM 2.297 ILD 2.J6~
SP -31.969 GA 72.250 ET 123.563 6R 72.250
SP -31.969 bb~ -999.250 LL5 -~99.250 GR -999.250
NP~i 39.014 RHO~ 2.31~ ~RBO -0.000 i£ALI 18.703
GR 92.750 NRA~ 4.000 NCNL 1822.000 FCNL ~33.000
P~tX -999.250 ,~N(R -999.250 M1NV -999.~50 CALI -999.250
DEFT 5000.000 SFLU 5.46~ iLM 4.160 ILD 3.525
5P -43.q38 GR 56.0~3 E~ 111.563 6R 56.063
SP -43.438 LbO -999.250 LLS '~99.250 GR -999.250
NPH1 30.859 MHO~ 9.307 ERHO 0.000 ,fALl i3.203
GR 63.281 N~A~ 3 ]22 NCNL 220~.000 f'CNL 513.000
PROX -999.250 MNOR -999~250 ~INV -99q.250 CAiI -999.250
Dh, PT
SP
NPH1
Gl{
~ROX
4~00.000 $~LU 3.965 1LM 1.935 I~D 1.687
-86.063 GR 36 69 124 750 6R 36.969
86.063 bLD -999:~50 LLS -999:250 G~ -999.250
31.738 RHOB ~ 137 DRMO ~.'.0 0'03: iCAti 12.492
40.500 NRAI : [~59 N'CNL 2430~000 FCNt 551'000
'999'250. MNO~ . ~999~250 99.250.. CALl 9.99. 50
DE:PT
SP
NPH1
GR
PROX
SFLU
GR
6,.2!'5i:31NRA:~
-999.250
~!:83:, 0:00 "GR .."
6.11 3 ILM 2. ~.4'7
45,' 46 9'.: ::::~ T'~::. :: ":::'. :::~: '.::'?::' 'I'19. 563':~.
'99.9.250 GR
I .854
4'51. 469
-999.250
SP -4
5P
b~[' 009.~02 ~Lf~I~iCATION LI$'IING PAGE 12
SP -25.5~9 LLD -999.250 LL6 -999.250 GR -999.250
NPHI 45.215 RMOB 2.252 D~BO 0.030 CALl 12.867
GB ,]3.813 NRA~ 4.250 [4CNL 1974.0(0 f'CNL 4~6.~50
PRO× -999.250 MNO~ -999.250 MINV -99).~50 C~L! -~99.250
DEPT ~4300.000 $f'LU ~.$59 IbM ~.6f8 ILD ~.5~3
$P -20.48Z4 GR 5e.531 DT 127.900 GB 56.531
8P -20.484 bbE -999.250 LLS -9c. 9.250 6[~ -9~.9.250
NPHi 34.473 RH(]b 2.~49 ORHO 0.021 C~LI 14.086
GR 65.000 N~$ I 3.580 NCNL 20~4.000 :fCNL 498.250
PRO~ -999.250 MNO[~ -999.250 glNV -999.250 CALl -999.250
ot~'r 4200.000 S~'LU 3.664 IL~t 2.445 .II3[ 2.131
SP -42.312 GR 55.938 DT 122 750 GR 55.938
SP -42.3~2 LL£ -999.250 LLS -9c. 9:250 (.[~ -9c-9.250
NPiil 36.865 RH08 2.225 DI~HO 0.002 C.~L] 13.141
OR 75.3~ NF{.,~ 3~7~3~. NCNL ~70.000 '.~C~L 5~5.000
PROX -999.250 M~OR -999.250 ~1N¥ -999.250 CALl -999.250
OEPT 4100.000 SP'LU 3.121 ILM 2.084 II3[ 1.7i8
S[~ -58.063 GR il4. 906 DT 136.750 GR 44~906
SP '58,063 LLE -999"250 LL:S -9~9 250 fir -9~. 9.250
NPHI 2'13~ DRBO -0:007 C~LI 15.148
GR 3"4'73 ' NC-NL: '::!9J~:4"0:00: :f'C1NL 496.000
PROX -999.250 MNOR -999'.250 MI. NV 999,250 CALl -999.250
DEPT 4000.000 S~LU 1.~.8 IL[~ 1 .305 IIJ[ 1.161
SP ': '90". 18'8: Gl{: 2.2~ 250 I25,7:50 i"GR 22 250
-9~9
gP -90.188 LLE -999'. ~50 LLS -9~9,250 '6R ~250
NPHi :: :35'~:98: RHO~ ~'' : ~2:,064 .~,~0,012:~;C~Li ~4.148
GR 36.g8~ NBt ~ 3164a NCNL 2~48.000 :[CSL 535.900
PROX '9'99:, 25:0 ~ ~ ' .9.99 ;: 250:: "M:t.:NV~: ::' ::~ ::: ~ :. ::~:':~9)'.;:.250:': ::: C'~LI ': '999:'250
...... U ~
DEPT ': 390':0'.000 Sf~ .,
SP -24.484 GR 6 .
NPRI 36.8i~ ~HOS :
P~OX -999.250 MN~ -999.
DEPT 3800.000 SFLU ~.
-44.7,8,1 L, bE '999.250 5L,5
36.4:2.15 ~ iH 00 : , ' 12.'2:3::~:,.
68.250 NFlit T 3'0c. 3 .NCNL
99' 250 tq:NO~:. :: "','999; 250 :::.'
N~Ri 39.453 RaO8 2.074 DR~O
GR
PROX
i.)E~ T 3600 . 000 St'"b U 1., ..t54
O. 9") 6 ILD I . :340
LVP 009.~i02 V~RIEICAT'~ION LISTIN3
PAGE 13
SP -40.344 G~ 70.063 Dq 138.000 GR
SP -40.344 LDD -999.250 LL$ -999.250 GR
NP~] 35.645 R~OB 2.211 DRBO O.O1B CALl
GR 83.6~8 NRfiI 3.775 NCNL 1805.000 6'CNL
PROX -999.~50 MN~R -999.250 NIN¥ -999.250 CgL1
70
-999
18
440
-999
.063
.250
.656
.500
.250
DEPF~ 3500.000 SfLb 1.190 IBM 0.916 ILD
$P -75.5~3 GR .31.266 DI 139.750 GR
$P -75.563 bLD -999.250 LLS -999.250 GR
NPHI 39.795 RHOB 2.074. DRBO -0.000 CALl
GR 42.8'25 NRAI 3.953 NCNI., 1727.000 FCNI
P~OX -9~9.~0 MNOR -9~9.250 MiNV -999.250 CALl
0
31
-999
15
386
-999
.804
.266
.250
.094
.500
.250
DEPT 3400.000 SFLU 1.967 ILM 1.607 ILD
$P -64.750 GR 30.4O6 DT 133.500 GR
SP -64.750 LLD -99~:~50 LL$ -9~9.~50 GR
NPHi ~9.6~8 RMOB 33 DRBO 0.004 CALl
GR 32.625 NRAI ~.' ~91. NCNL 2616.~00' FC~L
PROX -999.~50 ~N~R o9§~-250 MI~V 999. ,50 CALl.
1
3O
-999
18
-99
.283
.406
.250
.672
000
~250
DEPr
SP
SP
NPH1
GR
PROX
3300.000 5[~"L U 2.020 ]L.m 1.103
~80"4~8 GB ~8'~75 :D'T 146.90.0 'GR
80. ~38 bbD -9~9.'250 LLS -999,250 GR
3'3.7~:40 R~0B ~: O~:g :CALl
38.969 NRg~ .566 NCNL 1904.000 FCNI,
· : . .
".9':99i'~5:0 M R 999;250 'NI::.N:~::' :': . "999:. 250:~ CALl
0.962
28.875
-999.250
:15'297
495'250
'9:99,'2:50
SP '53'50'0:: LLD
NPMI 35.9~6 RHOB
GR
PROX
2. 5'4' DA'HO .
-999.250 gll~V -99'9.
1~':2::"::::::1/~D I.' 890
· 5°': s6
):50 : :'GR':::.:: :: ':99:9,250':
03 CALl 14,406
000. :' ~: :.:C'N[. 506 000
250 CALI -999:250
3.605 l. I, lvi ~.416 ILD 2.1.58
:4:7:.. 063' '.::: :':'D.:??. 1'2.:~:.'3:'~5 !'~:, :: ,:GB ', 7, '06'3
-999. 250' LES -999; 250 GR -999.250
2.2:38, ':,:-: D':R HO'<'!? ::::'>.~'.'~0.0::I 6'~< >' :::C:A.:~il 1'8' 7:1"9
4'598 NCN'L 14i0.000 FCNL 289.750
"':~:'~N~: :: ..... 'i:' ",99'9:'~50: CA'L!,:' '999:'250
: SP 5:1:',500 'LLD 99::
NPB. I ,/1~. 33:4 RHOB .002 DRB[i 0,01'5 CALl
G R' : ':': ' ,':':-:: :': 5::i:. ,,:563N R:A T : ,':4.2' I~5:': ': :.:'~E:N~B: >,:,,:: ~: ~ ':' ':I 4::26.0:00:: ;::. 'FC.NL
PROX -999.2~0 i~NO'R -999.250 ~IN~ '999.250 CALl
~ 12... 1:72:
.469
.:':999:, s 5
3'05,5'0:0
-999. 250
DifP r!
SP
SP
NPH1
GR
PROX
2900.000 SFLU 3.590' 'ILM 2,336 iLD 2.117
,47.6~ 5: (J, '::tt6.25'0' LDT 130:. 3:~,5 ::,:G:[~ ~.6 250
-47.625 LLD -999.250 LLS -999,2'50 G~ -999:250
39:'I):1:'~ 'R~gB' <"::' ':': .2 Z~3 :.:'D.RB:: :CALl 328
57.5~4 NR~t: 3 89~ NCNL ~5'84,000 FCN] 374~750
~9:99;~0 MNOR 999.250 .:,MiN~ 99, Z50 C3I.I . 9.250
LVP 039.ii~2 %/£RIflCA'IION LISTING
DkPT 2800.O00
SP -45.O31
NPBI 41.113
GR 40.93~
PROX -999.250 MNOR
DEPT 2700.000 SFLU
SP -123.000 GM
SP -31.328 bbg
NPH1 61.914 RHOb
GR 22.781 NR~
P~O~ -999.250 MN~R
D~PT 2600.000 $~'LU
SP -134.000 GR
SP -49.8'75 LbE
NP~I -999.250 RHOB
GR ~999 ~50
PROX 999~ 50
DEPT 2500.000 SFLO
SP -!26.500 GR
SP '54.344 hbg
NPHI -999.250 RHOB
GR -999.250 :NR~I
PROX -999.250 MNOR
}.346 iL~ 1,.3~6
55.375 D7 155.500 G~
-999.250 LbS -9~q.250
I.~5~ DRHO 0.004 C~L]
4.078 NCNL 1423.000
-999.250 MINV -999.~50 CALl
~.522 IL~ 0.955 .~U[
22 535 D~' 143.375 G~
-9991~50 LL$ -9~9.250 6R
-0.000 DRHO -h.945 C~LI
4.~76 NCNL ~253.000 i~CNL
-999.250 MINV -999.250 CALl
1.~19 ILM I .018 1Et
24.406 DT 147.000 GR
-999.250 bLS -9c. 9.250 C.R
-999.250 DI~HO -99;) 250 C~LI
-999. 250 NCNL -9¢. 9 ~ 250 ;~ CNL
-999.250 MINV -999,250 CALl
1'575' IL.M 1 0i2
147 '
.750
.9. c, 9. 250
99 }. 250 C',~LI
',9'991.~5'0 NCNL: ""':'9~'9 250 :PCNI,
-999. 250 lVilNV -999~"'250 CALl
1.305
55.375
-9!9.250
16.531
329.250
-999.250
0.892
22.531
-9!9.250
1.656
248.875
-999.250
0.917
24.406
-9~9.250
-~99.250
-999.250
-999.250
125
'~99'250
-999.~50
999. 50
.930 .II3[ 0.842
: .DEP: 2:3:0:0:~000 :'S:FJL;:U .. 5 ~ J, DT
SP -125.500 GR ~ :'"'
SP. : . ~'999',250 : 99 ~:I~:S:'',
NPHi '999. 250 AH08 '999. 250 DBBO
GR '999,250 .NR~I '999.2:50 NCNL
PROX =999,250 .MNOR -999.250 N]NV
DEPT
SP
$P
G~
PROX
2200. 000 SFLU
2.32b
2.
.9 :':"
.250
9::9:7
~"' . :"~,:9:'~' 9', 2. 50 .-!:,..,' ~: R:.~,: ' 9:~.9,250
' ,~'; 250 C lI:,l --)99. 250
' - 250
-9~'9'
:'999 ,
1 . 359 IISI:
t:4':~ , 50:O.: :G~
-9~9 . 250 ~R
1.233
2B,:547
-9~.' 9 i250
99,250
~ 9
:99:-250
'999,250
DEPI 21.00.000 S~LU 2.44i :.i.LM .. ...... l.'7:lO::'::!:'::.
BP -i 2'6.500 GR 4-4.1 88 DT 148.7'50 G'R
BP :':. '"~9:9:; ~5:0' ~:~g ::'' ~: ~L:S. :::~' ::': .9'~':9:'; 2:5::0 :.6R::
OR :' :::' '999';~0: NH~ I': ":99:9;:250.:":NC:N5 ::':: <':' '.~.9',~::9; 250 :;~:C'N:L
p~oi '99'9:250. MNGR -999 250 MiI~V -999'250 CALl
{. . ( : : :. :..:. :..: :.: ·
LVP O09.HO~ YERiF'ICATION LISTING
PAGE ~15
DgPFi 2000.000 SFLO
SP 'i52.750 GR
SP '999.250 LLD
NPHI '999.2~0
GR '999.250 NRA~
PROX -999.~50
D~P~' 1900.000 SELU
SP -146.0(0 GR
SP -999.250 bbb
NP~I -999.250
GR -999.250 NRA1
PROX -999.~50 MNO~
DEPF~ 1800.000
SP -159.%50 GR
SP -999.250 LLD
NPH1 -999.250
GR -999-250 NRA%
PROA -999.~5o
SP GR
SP -999.250 LLD
NPHI _~99,25:0RHOB
GR 9'250
PRO:X :'~99'9~250'
DEPT
PROX
DEPt'
2.379 ibm l.TB5 ILD
25.156 DT i63.125 GE
-999.250 LLS -999.250 G~
-999.250 DRMO -999.250 CALl
-999.250 NCNL -999.250 FCNL
-999.250 MIN¥ -999.250 CALl
2.855 ILN 2.559 ILD
24.953 ST 160.000 GR
-999.250 bLS -999.250 G~
-999.250 DRHO .999 250 CALl
-999.250 NCNL -9991250 FCNL
-999.250 NINV -999,250 CALl
6.035 iLR 5.910 ILD
33.750 DT 1~4.000 GR
-999.250 LLS ~999 250 GR
-999.250 DRHO - -999~250 CALl
-999,250 NCN5 . ~99;9,250' FCN~
-999.250 NINV '999.250 CAL.
1
25
-999
-999
-999
-999
2
24
-999
-999
-999
-999
.711
.156
.250
.250
.250
.25O
.678
.953
.25O
.250
.250
.250
6.332
33.750
-999.250
-999.250
-999 250
-999~250
114.875 ILM 43.594 ILD 110.125
· z6.53~.i' DT 26.53!
-999.250 LL$ -999'250 G~ -999.250
-143.000 GR 54.189' DT 141;i'2'5 GR 54.18f~
:':99i9,25:0::":<':~h~:~S'': 9~ .9, 99,. 50
, -999.250 DRH~ '999.250 CALl - 99. 50
-999',2'50~' FCNL'9 ':'~9999'~:5'0
- 999. ~5 0'999' 250 MNO~ .'~9'9'99,25025:0~:':NC'MiNV ~' <'; 99.250 CALI -= .:,50
1500.000 SFLU 591.500 iLM 81.063 ILD 440.500
SP
SP
DEP I.~i
SP
GR
-99 NR 9.250
LVp 00§.~02 VER]i~IC2TIO~ LiSTIg(: PAGE 16
PRUX -999,250 i4 ,~08. -999.250 N:INV -999,250 CALl
DEPT 1200.000 $~bU 141.355 ILM 38,063
SP -196,500 GR 25,906 DT 81.000 GR
SP -999,250 bbE -999,250 LL8 -9~9,250
NPB1 -999.250 RhOS -999,250 DRMO -99).250 C,~LI
GR -999.250 mRll -999.250 NCNL -9¢,9.250 :~CKL
PROX -999,250 MNG}4 -999.250 M1N~ -999.250 CALl
OEPT 1100. 000 SFLO 380. 750 ILM :~ O. 063
SP -227.000 GR 31.578 D? 89,750
SP -999. 250 Lb5 -999, ~50 LL$ -9~ 9. 250
NPH1 -999,250 RH00 -999.250 DRHO -99~.250 C.~L]
GR -999,250 NR;T -999.P50 NCNL -9~,9,250 :fCNL
PROX -999.250 M~OR -999,250 MIN¥ -999,250 CALl
UEPT 1000.000 $~LU 493,500 ILN 42,219 lB[
SP -260,000 GR 27.328 DT 84,563 GR
SP -999,250 LL5 -999,250 LbS -9~9.250 6R
NPHi -999,250 RHO~ -999'-~50 DB}fO '99~,~,50 ~C~L!
GR -999,250 NB~'f -999.250 NCNL -9~,9,250
PROX -999,250 MNOR -999.~50 MINV -999,~50 CALl
DEPT
SP
31.719 DT 85. 000 GR
SP '999' 250 .l~L£ '999'250'.:':
~il '999.~50 RHOB -999;250 DR'BO '999.250 C~LI
GR :: ~ "999'25'0.. ::'
PROX -999.250 MNOR -999.250 M1NV '999.250 CALl
-999,250
66.063
25.906
-9~9.250
-)99,250
-999,250
-999,250
573,500
31.578
-9~9.250
-~99.250
-999.250
-999.250
666.000
2~.328
-9~ .250
-~99.250
99.250
-999.250
44~.250
31.719
-9S9 25:0
-999.250
'999'250
136.625
. 149. 000
SP 'i79,000 GR 54 094 DT
$ P ' 999:. 250 L ~g -99.9' ~.15 O. :: ~9~,9 '50:': '6R:
~PBI '9'§§; .2.,. 50 RH~B -999,250 D~HO ,; 9'9 ~)' ;"2 50 C'~/L I
GR · ::'9:99,250 'NB~?', : '999-'. 250-::,':"
PR, OX -999.250 MNOIq -999.250 MiP-;V '99~).250 CALl
9.71 !
250
99,250
-~99,250
DEPT ,000,000 SfLO 103,688 ILiq 28,234 ILD I(g.1~5
SP: , · '~;,, 247 :~:250 G R DT :8:7,56:3 GR 22, ::> 6
5P -999.250 L~g -999.25~ LbS -9~9,~50 :(P -9S9,250
NPH1 ' '999,250 R.HOB ' : '--999;:250. : '.~9:9:~)~250 :CA!~I: : "~99,250
.GA" ' "'"-~99.~50 NR$' "1 -999'.25() NCN" h '9'S9.250 :~CNL '999.250
' · PROX: : "99:9'250 :MNO:R '...'999.250
DEPI ,.00.000 SFLU ; ': 380:'~750.: :t':L-M: '::::. :~: 4:2 906': I~[ ::. : : : ::100,688
~ ' - 3'.000 G~ 27.~,88 ~)~' 75~750 GR . 27.188
SP Z 5
9.250 D~MO
NPHI -999.250 RHU8 -99 ' .250 CA[ii '999
g9g~
(.
DVP
PAGE 17
GR -999.25o
PROX -999.250
DiPi~ 400.000 SFLO
SP -298.250
SP -999.250 bLD
NPitl -999,250
GR -999.250 NRA~
PROX -999.250
DEPT 300.000 S~'LU
SP -297.250 GR
SP -999.250 LLD
NPHI -999.250 RHOB
GR -999.250 NRA~
PROX '999.250
DEPT 200-000 $~LU
SP 2349.250 GR
SP i 999'250 LLD
NPH1 -999.250 R,HOB
-999.250 NCNL -999.250 FC~.)L
-999.250 MINV -999.250 CALl
349.750 1LM 5B'.344
23.031 ER t3.563
-999.250 LLS -999.250 G~
-999.250 EBhO -9!9.250 ,(AL].
-999.250 NCNL -999.250 FCNL
-999.250 N1N¥ -999.250 CAI!
380.759 1L~ 4~.81~ ILD
21,969
-999.250 LL$ -~99.250 G9
-999.250 [R~O -9~9,250 ~(AL1
-999. 250 NCNL -999. 250 ~CNL
-999.250 NINV -999.250 CAI 1
280'759 iLM 56.719
27.609 El' ' ,(6.750
-999,250 LL$' :'999.2.50 GR
-999.250 ER'HO -9S9.250 ,CALl
GR
' PROX :. -999',250 'MNCR -999.25(1 ~:t1~¥:· :: .-999,:250 C,A2I"t
-999.250 L'I 56.000 .
-999.250
-999,250
286,000
23.031
-999.250
-9i9,250
-999.250
-999.250
538.000
21,969
-999.250
-9S9.250
-~9~.250
-999.250
1198.000
27.609
-999.250
-9~9.250
-999,250
-999.250
2~00.000
'I8
999:~ O0
50
99.250
-999.'.:25-0
-9.99: :.50
'9~.9: 250
-999.2:5.:0
9. 250
PROX -999.250 ~NOR -999.250 ~INV -999.250 CAll -9'99.250
LVP 009.;1-02 VEBIfl:CATIO~ hlSTII~G
18
CONTINb~,TiUN ~ :01
SERVi".E NAMgl :SERVlC
DATE :81/05/ 7
ORiGlh :
REEL NAME :~E~L iD
CONTINUATION # :01
NEXT ~EE, L NA~E :
COMMENTS :R~EL 2~MENIS