Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout211-0857. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-04B Wellhead Sealant Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 14494 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9005 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 None 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 11325 9012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer 9431 7188 Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907.748.8581 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 18 - 8623 IC Test Void in Wellhead at Surface Pump 26-cups of Greenstick. Final pressure = 0-psi Well Not Online Well Not Online 950 750 0 0 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9431, 7188 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:35 pm, Sep 15, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.09.15 12:18:09 - 08'00' Torin Roschinger (4662) J.Lau 11/6/25 RBDMS JSB 091925 ACTIVITY DATE SUMMARY 8/7/2025 T/I/O = SSV/960/580. Temp = SI. Bleed OAP (eval IAxOA). Flowline, AL disconnected. Spray in liner installed. OA cemented to surface. IC void packed with Greenstick. Bled OAP to 0 psi in <1 min (gas, fluid 1/8 cup). Held open bleed for 30 min. Monitored for 30 min. OAP increased 80 psi. Final WHPs = SSV/960/80. SV, WV, SSV = C. MV = O. IA = OTG. 12:00 8/9/2025 T/I/O = SSV/380/250. Temp = SI . Greenstick IC test void (Eval IAxOA). No AL. FL disconnected. OA cemented to surface. Heater installed in well house @ arrival. RU greenstick PKG gun to IC test port Hoke valve. Maintained open bleed on OA. Pumped 12.5 gun loads of Semi-Liquid Greenstick into test void. Unable to pressure up. Monitored for 30 min. Final WHPs = SSV/380/0+. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 9/11/2025 T/I/O = SSV/735/5. Temp = SI. Monitor (IA/OA). OA cemented to surface. No Flowline. Tree is LOTO. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 Daily Report of Well Operations PBU H-04B 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-04B Install Tubing Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 14494 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9005 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 None 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 11325 9012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer 9431 7188 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 18 - 8623 N/A N/A Well Not Online Well Not Online 450 950 0 0 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9431, 7188 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:23 am, Sep 12, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.09.11 16:34:13 - 08'00' Torin Roschinger (4662) WCB 10-3-2024 RBDMS JSB 091924 DSR-9/13/24 ACTIVITY DATE SUMMARY 6/8/2024 ***WELL S/I ON ARRIVAL*** PULLED 5-1/2" DSSSV FROM BAL-O SSSV NIP @ 2000' MD RAN 3-1/2" GR, 4.55" DMY KB PACKER DRIFT w/ 3-1/2" SPACER, DMY PTSA STINGER (20' oal) TO 5-1/2" x 4-1/2" XO @ 9438' MD (no issues) PULLED 4-1/2" EVO FROM 9448' SLM (9456' MD), FULLY INTACT AND ELEMENT RECOVERED ***JOB COMPLETE, WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 6/10/2024 *** WELL FLOWING ON ARRIVAL *** OBJECTIVE: SET 4.5'' NS PATCH RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RIH CH/CCL/BAKER #10 SETTING TOOL/4.5" NS PATCH SET PACKER WITH MID ELEMENT @ 9450', TOP OF PACKER AT 9437', BOTTOM OF PACKER AT 9457' CCL TO MD ELEMENT 20.3' CCL STOP DEPTH 9429.7' JOB CORRELATED TO TUBING TALLY DATED 1-9-90 *** JOB COMPLETE*** RDMO YELLOWJACKET ELINE ***WELL S/I ON DEPARTURE*** 8/18/2024 ***WELL S/I ON ARRIVAL*** (Patch tubing liner) TAG 4-1/2" x 5-1/2" XO @ 9,427' SLM SET NS 550-450 STRADDLE PATCH WITH EXTENDED PBR @ 9,418' MD PULLED 2-7/8" RSG FROM PATCH @ 9,437' SLM SET 5-1/2'' WHIDDON CATCHER ON PATCH @ 9414' SLM PULLED RM-DGLV FROM STA #1 @ 5,512' MD PULLED RM-DGLV FROM STA #2 @ 3,018' MD SET ST#2 RM-LGLV (16/64'' ports, 1500# tro) @ 3018' MD SET ST#1 RM-OGLV (20/64'' ports) @ 5512' MD PULLED 5-1/2'' WHIDDON CATCHER FROM PATCH @ 9414' SLM (empty) ***WSR CONT ON 8-19-24*** 8/19/2024 ***WSR CONT FROM 8-18-24*** SET 5-1/2" DB-DSSSV IN CA "BAL-O" SSSV @ 2,000' MD ***WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS*** 8/20/2024 T/I/O = 2010/910/20. Temp = SI. TBG & IA FL's, Bleed IAP to 1000 psi (Establish TxIA DP). No AL, S-riser, flow line, SSV hyd kit. TBG FL @ 5512' (sta#1 SO), IA FL @ 456'. SV, WV, SSV = C. MV = O. IA & OA = OTG. 13:50 Daily Report of Well Operations PBU H-04B SET PACKER WITH MID ELEMENT @ 9450', TOP OF PACKER AT 9437', BOTTOM OF PACKER AT 9457' @ SET NS 550-450 STRADDLE PATCH WITH EXTENDED PBR @ 9,418' MD 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-04B OA Downsqueeze, Wellhead Seal Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 9456 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 7206 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 9456 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 11325 9012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer 9431 7188 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 18 - 8623 OA at surface / IC test void on Wellhead / IC test void on Wellhead / OA at Surface Pump 11.5-gallons WellLock with final pressure = 1200-psi / 10-cups of Greenstick / 1/4-cup Greenstick / 1-gallon WellLock with final pressure = 1200-psi Well Not Online Well Not Online 50 600 0 0 323-584 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9431, 7188 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:25 pm, May 20, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.05.20 14:31:32 -08'00' Aras Worthington (4643) RBDMS JSB 052824 DSR-5/20/24WCB 8-28-2024 ACTIVITY DATE SUMMARY 11/4/2023 T/I/O = SSV/210/10. Temp = SI. Bleed IAP & OAP (strap OA). No AL. Flowline disconnected. 2" hardline riser installed on OA. Spray in line installed in cellar. Cellar depth 48". Heater working properly. IA FL near surface. OA cemented to surface. Bled IAP to BT to 0 psi in 30 min (gas/fluid mix, 0.2 bbls), held open bleed for 3 hrs. Bled OAP to 0 psi in 1 min (gas/fluid, 1 cup), held open bleed for 2 hrs. Monitored for 30 min. IAP increased 3 psi, OAP unchanged. Final WHPs = SSV/3/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 04:00 11/6/2023 T/I/O = SSV/210/0+. Temp = SI. Strap TOC in OA (pre squeeze). No AL, S-riser. Strapped TOC in OA @ 3.5" from side outlet on casing hanger. SV, WV, SSV - C. MV - O. IA, OA = OTG. 12:00 11/15/2023 ***WELL S/I ON ARRIVAL*** HES 759 R/U ***CONT WSR ON 11/16/2023*** 11/16/2023 ***CONT WSR FROM 11/15/2023*** PULL 5-1/2" DB- DMY SSSV FROM BAL-O NIPPLE @ 2,000' MD TAG RESTRICTION WHILE RUNNING 5-1/2" SSCS @ 2,228' SLM PUSH RESTRICTION FROM 2,228' SLM TO 4,100' SLM W/ 5-1/2" BLB & 4.5" G.RING(absorb recovered) SET 5-1/2" SSCS @ 3,100' SLM PULL 1-1/2" RM-DMY GLV FROM STA #2 @ 3,018' MD SET RM-FLOW SLV IN STA #2 @ 3,018' SLM PULL EMPTY SSCS FROM 3,100' SLM DRIFTED TO 4-1/2" XO @ 9,438' MD W/ 5-1/2" BLB & 4.5" WIRE GRAB(~2 cups of absorb) DRIFTED TO 4-1/2" WRP @ 9,580' SLM W/ 4-1/2" BLB, 3-1/2" BLB & 2.25" CENT (~1 cup of absorb) ***CONT WSR ON 11/17/2023*** 11/17/2023 ***CONT WSR FROM 11/16/2023*** HES 759 R/D ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS*** 11/21/2023 T/I/O = SSV/360/20. Temp = SI Bleed OAP to 0 psi (Pre Wellock). No AL. No S riser. Bled OAP to BT to 0 psi in ~1 min and held open bleed for 10 min (gas). Monitored for 30 min. OAP unchanged. Final WHPs = SSV/360/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 02:00 12/3/2023 T/I/O=500/1800/0 Pre Wellock. Removed working side OA gate valve and replaced with integral, block valve and cap. torqued to specs. Removed blind from companion side OA and installed integral, block valve and cap.Torqued integral to specs. Left OA valve in the well house. Job complete. FWP,s 500/1800/0 12/5/2023 T/I/O= 0/0/0 TFS Unit 3 Assist DHD Pumped a total of 1 bbl of 60/40 followed by 20 bbls of Fresh Water down the OA. Pumped the first 14 bbls of FW at 1 bpm and shut down. Followed by pumping 1 bbl and SD for 5 minutes for the remaining 6 bbls of FW. Well left inDHD control and PO notified upon departure. 12/10/2023 T/I/O = SSV/350/350. Temp = SI. T & IA FL. No AL. No S riser. T FL @ 230' (6 bbls). IA FL inconclusive. SV, WV, SSV = C. MV = O. IA & OA = OTG. 18:30 Daily Report of Well Operations PBU H-04B Daily Report of Well Operations PBU H-04B 12/10/2023 T/I/O = SSV/350/350. Temp = SI. Bleed IAP & OAP to 0 psi (pre-well lock). No AL. No S riser. Hardline rigged up on T, IA & OA to choke trailer and OT. T FL @ near surface. IA FL @ near surface. OA cemented to surface. Bled TP to OT to 230 psi in 30 min (FTS). Bled IAP to OT from 350 psi to 0 psi in 2 hrs (FTS). OAP tracked IAP. Held open bleed for 30 min. Monitored for 30 min. WHPs unchanged. Final WHPs = 230/0/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 00:30. 12/11/2023 **WSR continued from 12-11-23** T/I/O = SSV/20/1200. Temp = SI. OA Well Lock Squeeze. No AL. No "S" riser. Continued pumping Well Lock into OA to 1200 psi. Monitored for 30 min. OAP decreased 200 psi. Increased pressure back to 1200 psi. Monitored for 1 hr. OAP decreased 200 psi. Repeated total of 6 times until Well lock was too thick to pump. Final WHPs = SSV/100/950. SV, WV, SSV = C. MV = O. IA, OA = OTG. 05:15 12/11/2023 T/I/O=0/0/0 Assist DHD with Well Lock (CEMENT SQUEEZE) Pump down TBG w/ 188 bbls crude, Taking returns up IA to OTT to flush Well-Lock out of IA. FWHP=0/0/0 DHD on location upon departure 12/11/2023 T/I/O = SSV/20/0+. Temp = SI. OA Well Lock Squeeze. No AL. No "S" riser. Used 8 gallons of Welllock to flush OA and 3.5 gallons to squeeze OAP to 1200 psi. SV, WV, SSV = C. MV = O. IA, OA = OTG. 18:30 12/12/2023 T/I/O = SSV/70/500. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample has not setup. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:30 12/13/2023 T/I/O = SSV/70/350. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample getting firm, but not fully cured. SV, WV, SSV = C. MV = O. IA & OA = OTG. 02:30 12/13/2023 T/I/O = SSV/70/250. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample progressively getting firmer, but not fully cured. Solid to touch but able to indent sample. SV, WV, SSV = C. MV = O. IA & OA = OTG. 22:30 12/13/2023 T/I/O = SSV/70/400. Temp = SI. WHPs (eval Welllock). No AL. Heaters installed and working poperly. Wellock samples are hard. SV, WV, SSV = C. MV = O. IA & OA = OTG. 15:30 12/15/2023 T/I/O = SSV/70/330. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample progressively getting firmer, but not fully cured. Solid to touch but still able to indent sample. Well house was getting on the hot side, opened the secondary vent on heater. Tree cap pressure @ 100 psi. SV, WV, SSV = C. MV = O. IA & OA = OTG. 01:00 12/15/2023 T/I/O = SSV/70/190. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample appears to be cured. SV, WV, SSV = C. MV = O. IA & OA = OTG. 22:30 Daily Report of Well Operations PBU H-04B 12/16/2023 T/I/O = SSV/70/190. Temp = SI. WHPs (eval Wellock). No AL. Heaters installed and working properly. Wellock sample appears to be cured. Removed 1502 cap on hardline pup and Well Lock appeared to be cured there as well. SV, WV, SSV = C. MV = O. IA & OA = OTG. 20:30 12/19/2023 T/I/O = SSV/70/190. Temp = SI. Greenstick IC test void (Eval IAxOA). Heaters installed in wellhouse. RU greenstick PKG gun to IC test port Hoke valve. Pumped 5 loads of greenstick into test void. Held pressure for 1 hour to get a good pack. Rigged down equipment. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:00. 12/20/2023 T/I/O=147/194/2 CMIT TxIA to 2500 max applied 2750 ***job continued to 12-21- 23*** 12/21/2023 *** job continued from 12-20-23***T/I/O=147/194/2 CMIT TxIA to 2500 max applied 2750 PASSED Pressured TxIA to 2750 with 35 bbls 60* crude. 1st 15 min lost 53/51 psi, 2nd 15 min lost 29/29 psi, 3rd 15 lost 22/23, 4th 15 lost 16/15, for a total loss of 120/118 psi in 60 min test. bled T xIA back pressure. Final WHP's 287/269/0 12/24/2023 T/I/O = SSV/330/0, Temp = SI. WHPs (eval cellar). No AL. Flowline disconnected. OA CV removed, 2" hardline installed. Spray liner installed. No bubbling detected from conductor. IAP & OAP unchanged in 12 hrs. SV, WV, SSV = C. MV = O. IA = OTG. 14:30 12/24/2023 T/I/O = SSV/330/0. Temp = SI. WHPs (eval cellar). No AL. Flowline, OA CV removed, 2" hardline installed. Spray in liner installed. No bubbling detected from conductor. IAP increased 60 psi, OAP unchanged from 12/21/23. SV, WV, SSV = C. MV = O. IA = OTG. 03:00 12/25/2023 T/I/O = SSV/330/0. Temp = SI. Bleed IA (Rig up CVs). No AL. Flowline, OA CV removed, 2" hardline installed. Spray in liner installed. IA FL @ surface. Bled IAP to BT to 30 psi (12 bbls) in 5.5 hrs. Monitored for 30 min. IAP increased 6 psi. Final WHPs = SSV/36/0. SV, WV, SSV = C. MV = O. IA = OTG. 17:00 12/26/2023 T/I/O = SSV/113/0. Temp = SI. Bleed IA (Rig up CVs). No AL. Flowline, OA CV removed, 2" hardline installed. Bled IAP to 25 psi to BT (10.5 bbls) in 7 hrs. Monitored for 30 min. IAP increased 4 psi, TP increased 3 psi. T FL @ 370' (9 bbls). Final WHPs = 260/30/0. SV, WV, SSV = C. MV = O. IA = OTG. 17:30 12/27/2023 T/I/O = 280/70/0+. Temp = SI. Bleed WHPs to 0 psi (pre CV install). No AL. Flowline disonnected. OA CVs repaced w/ 2" hardline, spray in liner installed. T FL @ 510' (12 bbls). IA FL near surface. U-tubed TP & IAP to 260 psi. T FL @ 50' (2 bbls). IA FL @ 110' (14 bbls). Bled TP & IAP together to BT (5 bbls) to 110 psi in 18 hrs. Monitored for 30 min. TP increased 10 psi. IAP unchanged. T & IA FL near surface. Final WHPs = 130/120/0. SV, WV, SSV = C. MV = O. IA = OTG. 17:00 12/27/2023 T/I/O = 280/70/0+. Temp = SI. Bleed WHPs to 0 psi (pre CV install). No AL. Flowline disonnected. OA CVs repaced w/ 2" hardline, spray in liner installed. T FL @ 510' (12 bbls). IA FL near surface. U-tubed TP & IAP to 260 psi. T FL @ 50' (2 bbls). IA FL @ 110' (14 bbls). Bled TP & IAP together to BT to SV, WV, SSV = C. MV = O. IA = OTG. ******STARTED BLEED @ 22:45******** Daily Report of Well Operations PBU H-04B 12/30/2023 T/I/O=SI/800/0. Post Wellock. R/D hardline jewelry and integrals from both sides of OA, Installed working side 3" 3K OA MeEcoy valve, with gauge riser, torqued to specs. Installed 3" 3K blind on comp. side OA Torqued to specs. VR plug was not installed on comp. side due to complete wellock fill. FWP's SI/800/0. 12/31/2023 ***WELL S/I ON ARRIVAL*** SET 4-1/2" WHIDDON ON WRP @ 9,600' SLM PULLED RM-DGLV FROM STA#1 @ 5,512' MD PULLED RM-FLWSLV FORM STA#2 @ 3,018 MD SET RM-LGLV IN STA#1 @ 3,018' MD SET RM-SO GLV IN STA# 1 @ 5,512' MD PULLED 4-1/2" WHIDDON FROM TOP OF WRP @ 9,600' SLM (empty) PULLED 4-1/2'' WRP FROM 9600' SLM (all elements intact) ***WSR CONT ON 1-1-24*** 1/1/2024 ***WSR CONT FROM 12-31-23*** R/D POLLARD #61 ***JOB COMPLETE, WELL LEFT S/I*** 2/4/2024 T/I/O = 550/1150/15. Temp = 82*. Man watch for POP (assist OP's). PBGL from H- 40 online = 1150 psi. No IA companion valve. WS tightened up OA valve and blind flanges, leaks mitigated. Cleaned up small amount of fluid on conductor top. Conduct man watch. SV = C. WV, SSV, MV = O. IA & OA = OTG. 17:30 2/6/2024 T/I/O = 550/660/215. Temp = 87*. Monitor WHP's (eval conductor/cellar). PBGL from H-40 is SI = 700 psi. No IA companion valve. Pad OP bled OAP twice in the last 12 hrs, OAP reached 600 psi, and then 550 psi. Bled OAP to 0 psi from 215 psi in 5 seconds. Small amount of fluid at the outer edge of the conductor at the 10:00 position (appears to be water as it is clear and frozen). SV = C. WV, SSV, MV = O. IA & OA = OTG. 17:00. 2/14/2024 T/I/O = 1080/690/90. Temp = 87°. Bleed OAP (Ops). PBGL from H-40 is SI = 700 psi. No IA companion valve. Bled OAP from 90 psi to 0 psi in 5 seconds. Final WHPs = 1080/690/0. SV = C. WV, SSV, MV = O. IA, OA = OTG. 16:30 3/12/2024 T/I/O = 1080/860/0. Temp = 86°. IA FL (eval load). PBGL from H-40 is SI = 700 psi. No IA companion valve. IA FL @ 5512' (sta #2 SO). SV = C. WV, SSV, MV = O. 10:00 3/16/2024 T/I/O = 1080/560/560. Temp = 106° . Greenstick IC test void (Eval IAxOA). No AL. CNG gas lift RU from H-40 AL (SI @ quarter turn). FL disconnected. Temp 3" FL RU to H-36 tree cap. Heaters installed in wellhouse. RU greenstick PKG gun to IC test port Hoke valve. Pumped ~1/8 load of greenstick into test void. Held pressure for 1 hour to get a good pack. Rigged down equipment. Bled OAP to 0 psi. Did not monitor. Final WHPs = 1080/560/0 SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00. 3/29/2024 ***WELL FLOWING ON ARRIVAL*** TAGGED 4-1/2'' XO w/ 4.50'' G-RING @ 9430' SLM / 9438' MD (+8 corr) ***WSR CONT ON 3-30-24*** 3/29/2024 Travel to location Daily Report of Well Operations PBU H-04B 3/30/2024 T/I/O 2250/650/650 Assist Slickline. Freeze protect flowline. Load tubing with 250 bbls of crude. Released from jobiste. Final WHP's 350/680/600. SL in controll of well upon departure 3/30/2024 ***WSR CONT FROM 3-29-24*** T-BIRD FP FLOW LINE & HARD LINE T-BIRD LOAD TBG 250BLLS CRUDE BRUSHED w/ 4-1/2'' BLB, 3.80'' G-RING @ ~9600' SLM SET 4-1/2" EVO @ 9,618' MD ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 4/2/2024 T/I/O = SSV/630/610. Temp = SI. Bleed IAP & OAP (pre-Well Lock). No flowline, no AL line. IA FL @ 5512' (sta #2 SO). Bled IAP to OT from 630 psi to 70 psi in 6 hrs. Bled OAP to BT from 610 psi to 0 psi in 30 seconds. Monitored for 30 min. IAP unchanged. OAP increased 10 psi. Final WHPs = SSV/70/10 SV, SSV, WV = C. MV = O. IA, OA = OTG. 17:00 4/3/2024 T/I/O = SSV/11/21. Temp = SI. Bleed IAP & OAP (wellock). PBGL disconnected. IA FL @ 5512' (sta #1 SO). OA cemented to surface. Bled IAP to OT to 1 psi in 8 hrs. Bled OAP to 0 psi in <1 min (gas). held open bleed for 8 hrs. Monitored for 30 min. IAP, OAP unchanged. Final WHPs = SSV/1/0. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00 4/3/2024 T/I/O = SSV/80/10. Temp = SI. Bleed IAP & OAP (wellock). PBGL disconnected. IA FL @ 5512' (sta # 1 SO). OA cemented to surface. Bled IAP to OT to 4 psi in 7 hrs. Bled OAP to 0 psi in <1 min (gas), held open bleed for 7 hrs. No monitor. Final WHPs = SSV/4/0. SV = C. WV, SSV, MV = O. IA, OA = OTG. 04:30 4/8/2024 T/I/O = SSV/110/100. Temp = SI. Bleed IAP & OAP (wellock). Cellar measures 36" to top of ice. Cellar normally 48" to cellar bottom. IA FL @ 2395' (3117' above sta #1 SO). OA cemented to surface. Bled IAP to BT to 80 psi in 3 hrs. Bled OAP to BT to 0 psi in <1 min (gas). held open bleed for 1 hr. Monitored OAP for 30 min. OAP increased 10 psi. Did not moniotor IAP. Heater placed in WH, door propped open. Final WHPs = SSV/80/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 4/9/2024 T/I/O = SSV/100/50. Temp = SI. Bleed IAP & OAP (wellock). Cellar measures 36" to top of ice. Cellar normally 48" to cellar bottom. IA FL @ 2395' (3117' above sta #1 SO). OA cemented to surface. Bled IAP to BT to 30 psi in 6.5 hrs. Bled OAP to BT to 0 psi in <1 min (gas). Held open bleed for 1 hr. Monitored OAP for 30 min. OAP increased 10 psi. Did not monitor IAP. Heater trunk removed from well house, per Ops request. Final WHPs = SSV/30/10. SV, WV, SSV = C. MV = O. IA, OA = OTG. 15:45 Daily Report of Well Operations PBU H-04B 4/10/2024 T/I/O = SSV/30/10. Temp = SI. Remove OA CV and install integrol/hardline (wellock prep). Cellar measures 36" to top of ice. Cellar normally 48" to cellar bottom. IA FL @ 2395' (3117' above sta #1 SO). OA cemented to surface. Bled OAP to bonded bucket in <1 min (gas). Hardline crew RD OA spool & OA CV (3" 3K valve) and stored inside WH, R/U integrol and hardline to OA for upcoming OA Wellock Squeeze. Heater in WH warming wellhead for Wellock, door propped open. WH flooring removed in select locations. Final WHPs = SSV/30/0 SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:45 4/11/2024 T/I/O = SSV/30/0+. Temp = SI. OA Well Lock Squeeze. No AL. No "S" riser. Used 1 gallon of Welllock to squeeze OAP to 1200 psi. Monitored for 1 hr. OAP decreased 40 psi. Attached Accumulator to OA jewelry, and increased OAP to 1200 psi before departure. Accumulator will remain on OA jewelry until Wellock cured. Heater trunk in wellhouse w/ door propped open. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 4/11/2024 T/I/O = SSV/70/980. Temp = SI. Wellock. PBGL disconnected. FL, OA CV removed. Heater working properly. Sample not set up, too thick to pour. Charged OAP to 1200 psi. Performed drill - Heater smoking excessively. Hit ESD on heater and disconnected trunks. Notified Emergency and Ops personnel. Readied fire extinguisher for use and monitored until Emergency services arrived. SV, WV, SSV = C. MV = O. IA, OA = OTG. 22:30 4/13/2024 T/I/O = SSV/110/ 800. Temp = SI. Welllock. NO flowline. PBGL disconnected. Increase OAP squeeze to 1200 psi. Tree cap @ 2000 psi, bled to 500 psi, pressure climbs back up quickly. Grease crew called to service SV. SV, WV, SSV = C. MV = O. IA, OA = OTG. 10:15 4/14/2024 T/I/O = SSV/120/ 1350. Temp = SI. Eval Welllock in OA. No AL. Flowline disconnected. Bled OAP to 1200 psi. Tree cap pressure @ 2200 psi, Bled to 0 psi, but rapidly increasing. Heater in WH and working properly. Sample is firm to the touch, but not fully cured. SV, WV, SSV = C. MV = O. IA, OA = OTG. 10:15 4/16/2024 T/I/O = SSV/150/ 500. Temp = SI. Eval Welllock in OA. No AL. Flowline disconnected. Increased OAP to 1200 psi with lift gas. Heater in WH and working properly. Sample completely solid, appears to be set up. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:30 4/29/2024 ***WELL S/I ON ARRIVAL*** (Cement squeeze) SET 5 1/2" WHIDDON CATCHER(wcs-51) ON 4 1/2 XO AT 9,438' MD ***CONTINUED ON 4/30/24 WSR*** 4/29/2024 Assist Slickline (CEMENT SUEEZE (OA/IA DWNSQZ)) Job postponed 4/29/2024 T/I/O = 2340/830/800. Temp = SI. T & IA FL (SL request). No AL. 2" hard line rigged up to IA, flowline disconnected. T FL inconclusive (couldnt see past catcher @ 9438'), IA FL @ 1060' (4,447' above sta #1 SO). SL in control of valves upon departure. 01:30 jy Accumulator will remain on OA jewelry until Wellock cured. Heater trunk in wellhouse w/ door propped open Eval Welllock in OA Used 1 gallon of Welllock to squeeze OAP to 1200 psi g Sample completely solid, appears to be set up. @ Heater in WH and working properly Daily Report of Well Operations PBU H-04B 4/30/2024 ***CONTINUED FROM 4/29/24 WSR*** PULLED RM-LGLV IN ST# 2 @ 3,018' MD, REPLACED w/ RM-DGLV PULLED RM-OGLV IN ST# 1 @ 5,512' MD, REPLACED w/ RM-DGLV PULLED 5-1/2" WHIDDON CATCHER @ 9,438' MD (empty) PULLED 4-1/2" EVOTRIEVE PLUG @ 9,618' MD LOAD TBG w/ 290BBLS CRUDE SET 4-1/2" EVOTRIEVE @ 9,438' SLM (9456' MD) ***CONTINUED ON 5/1/24 WSR*** 4/30/2024 T/I/O 1515/625/634 Assist Slickline (CEMEMNT SQUEEZE (OA/IA DWNSQZ)) Pumped 290 bbls 190* crude down Tbg for load. Pressured up Tbg to 1000 psi w/ 7 bbls crude. ***Job Cont to 5-01-24 WSR*** 4/30/2024 T/I/O = 1340/950/900. Temp = SI. IA FL (SL request). No AL. IA FL @ 1272' (4240' above sta#1 SO). SL in control of well upon departure. 09:00. 4/30/2024 T/I/O = 1000/650/670. Temp = SI. IA FL (SL request). No AL, 2" hard line rigged up to IA. IA FL @ 1,880' (227 bbls). SL bled IAP, IA FL inflowed 340' to1,540' (186 bbls). 02:00 SL in control of valves upon departure 5/1/2024 ***CONTINUED FROM 4/30/24 WSR*** (Cement squeeze) LRS PUMPED 228 BBLS CRUDE INTO IA LRS PERFORMED MIT-IA TO 1500 PSI **PASS** LRS ATTEMPTED MIT-T TO 2500 PSI **FAIL** (lost 440 psi in first 15 min, ia gained 90 psi) SET 5-1/2" DSSSV IN BAL-O NIP @ 2000' MD (attempted MIT-T again after valve was set, failed at similar rate, same pressure gain to ia) LRS ATTEMPTED CMIT-IA TO 1500 PSI **FAIL** ***JOB SUSPENDED, WELL LEFT S/I, DSO NOTIFIED*** 5/1/2024 ***Job Cont from 4-30-24 WSR*** Asssit Slickline (CEMENT SQUEEZE (OA/IA DWNSQZ)) Pumped 228 bbls crude down IA to fluid pack for lube and bleed. MIT-IA PASSED to 1500 PSI. Loss of 46 PSI 1st 15 MIN, Loss of 17 PSI 2nd 15 MIN. for a total loss of 63 PSI during 30 min test. MIT-T FAILED to 2750 PSI Loss of 486 PSI 1st 15 MIN. CMIT TxIA FAILED to 1500 Loss of 47/15 TxIA 1st 15 MIN. Loss of 37/8 TxIA PSI 2nd 15 min. Bled down pressures. FWHP=530/527/27, Tags hung, S-Line on location upon departure 5/8/2024 T/IA/OA=219/260/50 Perform MIT-IA; MAP 2500 PSI Target 2250PSI Pumped 45 BBLS to ahieve test PSI ****MIT IA PASS***** AT 247/2510/80, 15 min loss of 105 PSI 30 min loss of 27, total loss of 132 PSI, Bled back 7 BBLS FWHP=232/500/80 JOB Complete g LRS ATTEMPTED CMIT-IA TO 1500 PSI **FAIL** CMIT TxIA FAILED 1 Regg, James B (OGC) From:PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent:Friday, December 22, 2023 7:43 AM To:Regg, James B (OGC) Cc:Wallace, Chris D (OGC); Oliver Sternicki; Torin Roschinger Subject:UNDER EVALUATION: H-04B (PTD #2110850) CMIT-TxIA Passed post wellock Attachments:MIT PBU H-04B 12-21-23.xlsx; Hilcorp_12-21-23_00-56-54_DETAILED.pdf Mr. Regg,   Producer H‐04B (PTD #2110850) passed charted CMIT‐TxIA (see aƩached chart and 10‐426) post well lock per sundry #323‐584 with  no pressure observed on the OA throughout test. The well is now classified as UNDER EVALUATION for up to 60 days of producƟon  once tubing plug is removed to evaluate TxIA repair economics. 12 hour cellar watch will be recorded per sundry #323‐584.  Please call with any quesƟons or concerns.  Ryan Holt  Hilcorp Alaska LLC  Field Well Integrity / Compliance  Ryan.Holt@Hilcorp.com  P: (907) 659‐5102  M: (907) 232‐1005  _____________________________________________  From: AK, D&C Well Integrity Coordinator   Sent: Thursday, January 5, 2012 8:18 PM  To: 'Regg, James B (DOA)' jim.regg@alaska.gov; 'Maunder, Thomas E (DOA)' tom.maunder@alaska.gov; 'Schwartz, Guy L  (DOA)' guy.schwartz@alaska.gov; AK, OPS GC2 OSM AKOPSGC2OSM@bp.com; AK, OPS GC2 Field O&M TL  AKOPSGC2FieldOMTL@BP.com; AK, OPS GC2 Wellpad Lead AKOPSGC2WellpadLead@bp.com; AK, OPS Well Pad SW  AKOPSWellPadSW@bp.com; AK, OPS Prod Controllers AKOPSProdControllers@bp.com; Cismoski, Doug A  CismosDA@BP.com; Daniel, Ryan Ryan.Daniel@bp.com; AK, D&C Wireline Operations Team Lead  AKDCWirelineOperationsTeamLead@BP.com; AK, D&C Well Services Operations Team Lead  AKDCWellServicesOperationsTeamLead@BP.com; AK, RES GPB West Wells Opt Engr AKRESGPBWestWellsOpt@BP.com  Cc: Walker, Greg (D&C) Greg.Walker2@bp.com; Olson, Andrew olsoa3@BP.com  Subject: NOT OPERABLE: H‐04B (PTD #2110850) SC Leak Confirmed  All, Producer H-04B (PTD #2110850) passed an MIT-IA proving two competent barriers to formation. However, while pressures were being bled after the MIT, fluid returns were seen in the conductor. An MIT-OA was performed to evaluate and fluids were returned to surface from the conductor during the MIT-OA confirming a surface casing leak. The well is reclassified as Not Operable and should remain shut in until repairs are conducted and integrity is restored. Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU H-04BPTD 2110850 Test chart extracted from 900+ page report of pressures from the test; entire report available in G:\AOGCC\Wells -- J. Regg, 12/26/2023 Submit to: OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD 211085 Type Inj N Tubing 148 2752 2699 2670 2648 2632 Type Test P Packer TVD 7188 BBL Pump 35.0 IA 196 2729 2678 2649 2626 2611 Interval O Test psi 2500 BBL Return 15.0 OA 2 1 0 0 0 0 Result P Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Well Pressures:Pretest Initial 15 Min.30 Min.45 Min.60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W = Water P = Pressure Test I = Initial Test P = Pass G = Gas O = Other (describe in Notes)4 = Four Year Cycle F = Fail S = Slurry V = Required by Variance I = Inconclusive I = Industrial Wastewater O = Other (describe in notes) N = Not Injecting Notes: Hilcorp North Slope LLC Prudhoe Bay / PBU / H Pad Brenton Nicholson 12/21/23 Notes:Charted CMIT-TxIA to 2500 psi Post Wellock per Sundry #323-584 Notes: Notes: Notes: H-04B STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov Notes: Notes: Notes: Form 10-426 (Revised 01/2017)2023-1221_MITP_PBU_H-04B       J. Regg; 12/26/2023                           !" ! "# !" ! "$ !" ! "% !" ! "&    '(  )  #$*$#*$+$%#$,-,& #$*$#*$+$%$#$%. )/+& 0( -+ .-  !" #$*$#*$+$%#$,-,&    7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU H-04B OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 341J ADL 0028284 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 9580 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 7298 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 2420 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 9580 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 113259012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer No SSSV Installed 9431, 7188 Date: Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com (907) 564-4763 PRUDHOE BAY 11/5/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 3:56 pm, Oct 26, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.10.26 12:12:33 -08'00' Torin Roschinger (4662) 323-584 * Approved for 60 day 'flow under eval' if passing CMIT-TXIA * 12 hour cellar check for flow or bubbling during 60 flow test. MGR01NOV23 10-404 SFD 10/30/2023 DSR-11/2/23&': Gregory Wilson Digitally signed by Gregory Wilson Date: 2023.11.03 08:07:57 -08'00'11/03/23 RBDMS JSB 110723 OA Downsqueeze H-04B PTD: 211-085 Well Name:H-04B API Number:50-029-20104-02 Current Status:Not Operable, Secured Rig:FB, SL Estimated Start Date:11/5/2023 Estimated Duration:3 months Regulatory Contact:Abbie Barker First Call Engineer:Aras Worthington (907) 440-7692 (c)(907) 564-4763 Current Bottom Hole Pressure:3,300 psi @ 8,800’ TVD (Est.)7.2 PPGE Max. Anticipated Surface Pressure:2420 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 2175 psi (Taken on 01/09/2012) Min ID:1.78” ID – deployment sleeve @ 10,700’ MD Brief Well Summary: x H-04A was CTD sidetracked in 2011. A surface casing leak materialized in 2012. An MITOA to 1200 psi failed with the pressure rapidly dropping to ~300 psi and fluid returns observed in the conductor. x The well currently has one-way IA x OA communication (from the IA to the OA) but the OA pressure does not communicate to the IA. There is also a small one-way tubing leak from the tubing to the IA. x The OA was cemented to surface during well construction in 1971. Objective: Execute an OA downsqueeze with cement and/or Well Lock. Achieve a passing CMIT-TxIA. POP the well Under-Evaluation for up to 60 days to validate that the SC leak is fixed and establish production rates to decide if the tubing leak is economic to repair. Procedure: DHD 1. Displace fluid level in OA with nitrogen. 2. Strap TOC in the OA. Slickline 3. Set Flowsleeve in GLM @ 3018’ MD. DHD 4. Verify that the IA and tubing are fluid-packed. 5. Top off the OA with cement and/or Well Lock per the volume of OA established by strapping TOC. 6. Squeeze the OA to 1200 psi with Microfine cement and/or Well Lock to seal off the SC leak. Fullbore/DHD 7. Circulate a bottoms-up down the production tubing, through the flowsleeve in Sta #2, with returns from the IA to flush any cement or Well Lock that may have squeezed into the IA. 8. FP tubing and IA. DHD 9. Pump Green-Stick packing into the IC void. Fullbore/DHD 10. CMIT-TxIA to 2500 psi. Verify no communication to the OA. 30 minute charted test. - mgr OA Downsqueeze H-04B PTD: 211-085 Slickline 11. Run GLVs 12. Pull WRP @ 9580’ MD. Operations/DHD 13. POP the well Under-Evaluation through hardline to an adjacent well. 14. Keep a cellar-watch for the first 24-hours to verify no fluid from the conductor. 15. Re-squeeze the OA with cement or Well Lock if the SC leak is not fixed. 16. Keep the well online for up to 60 days to verify the SC leak is fixed and test the well. 17. SI well after 60 days and evaluate economics of LDL and repairing tubing leak. Attachments: 1. Wellbore Schematic 2. Sundry Change Form 18. 12 hour cellar check for SC leak during 60 day flow under evaluation period. - mgr OA Downsqueeze H-04B PTD: 211-085 Wellbore Schematic OA Downsqueeze H-04B PTD: 211-085 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date I , O O ' o Es o E a Es j- o m o 0 o m E o o U a o Z 1 a a) a) V m p a N a) 0N >� 0c LU E 0 = o W U O ct j N C j CO d (n d J 0 a d 4) cL L J n. .T+ o ' E ce w K y zLL _._ y an co E o. ec co a) oz Ut J 0......c O 2 U `2 >p> p a Z Z �'N ET. C2 5 F-J 5 20 2F- 2 WX0 Q CO 0 j N N N N N v- , I, CL m NNJ q N N N N ;n nn n n ip a o � _ o O CZ J o2 c c c c c a) y c E - = = (r) to I c a a) a a a cc co) o OUi0 O O O O 0 U O 0 LN Q c :o 01 ! 0_ _ aZ 2• U m o v-N co co n )in � co w m aha ZZ N W g m o (n Z W w v C J a) I V m D '- Z I! c y a ` ti • I' ce Z o c ZS 2 I o I'I a m , coIo 2 .1-,6 • 0 Om p ZI U U UJ 0 m 0` N• N yii2 l N co as L0 LO Lo EE o U N N In In NN I ! o) cn1 Q 4 H = o H ~ • _ Z N 16 5 Z G M a) co • a c co i'', I t 0 x j p I''I I to II Qcec a a) Io 1 Q C n ZI Z• w Q Z O > > > > 1 d U to o u) N *IT'S AJ 10 N > N >. N CO ZI. W' �' Q' CC I y a) o as a CO 0 C C E E 3 a) E E z E = E > j > > o I I rn • Z c as c as c a) a) v +, y C7 o Z Z m Z ii ay 1- F o 1 !O p 1.0 1 • j 1 CO w I« a) .D � OCO ...I vEi Nc O a) d o 7 _ }N N N l a tpz r 0 p.+ + cn d 0N OLL Q O E E E z v F. Q) I Z V O LL vl v) N CO CO J p W yam, w.. O) q J J J Z Q �. 2 LO D O V C D a) \, + 0.-1- J O Z o 1:13 t �• C Q ami J m \ \` ` 'J 0 p = a m(D 1 E • 0 C7 F-i .4a y o)+"� a o CO' 0 CO a o 0 0 m o a) r ca) o G Q. o H 3 J 0 FT J J J J W J W W ? Q 0 <d' C) 9 N 1 9 et O IIi ' A, o z (II i 0) 0N N o Z E. II Q 1 J U Z cn ;Si Cn 19 Iii r�/ J 0 IX Q c O O 0 LU o IX J O. LU x W J U m Q Z Q d l J a 2 O co O. C N c g O a� O � E V N U W Q 9 1._ I ~ �j ? o G Q M CO CO Cl) 0 a) lj:72ii._ m To 0 Q O l""" a °' Q z E Q d U L. Z m • 0 m in m O 3 N a) ._ d D• coin 0 ✓ IGO a 0 o a 2 U 2-059 BAKER HUGHES www.bakerhughes.com PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION (ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME H-04B STATE ALASKA FIELD PRUDHOE BAY UNIT DAIS 2/16/2012 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#4045226 Log CD Log CD Copies Copies Client / Partners Copies Copies Client / Partners 2 Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082 A HOUSTON,TX 77002 1 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W. 7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Company Company Person Person Address Address Page 1 of 1 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-04B Attempt Wellhead Sealant Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 9580 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 7298 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 9580 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 11325 9012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer 9431, 7188 9431 7188 Torin Roschinger Area Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 18 - 8623 IC Test Void in Wellhead at Surface Pump of 30-cups of Greenstick packing Well Not Online Well Not Online 450 250 0 0 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 4:14 pm, Jul 18, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.07.18 13:42:58 -08'00' Torin Roschinger (4662) WCB 3-6-2024 RBDMS JSB 072023 DSR-7/19/23 ACTIVITY DATE SUMMARY 7/11/2023 T/I/O = SSV/240/150. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No AL. No Sriser. RU to Hoke valve installed on IC test port. Opened SBS on off side port, bled void to 0 psi. Pumped 4 loads of Greenstick (self mold) plastic into test void. No returns from off side port. Rigged back to continue 7-12-23. SV, SSV, WV = C. MV = O. IA & OA = OTG. 17:30. 7/12/2023 T/I/O = SSV/240/150. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No AL. No S-riser. RU PKG gun to Hoke valve on IC test port. Bled IAP to 0 psi (gas/fluid), OAP tracked to 0 psi. Returned 1.25 bbls fluid. Bled test void to 0 psi through SBS. Pumped 8 gun loads of Greenstick (Self mold) plastic into test port. No returns from off side port. Rigged equipment back to continue 7-13-23. SV, SSV, WV = C. MV = O. IA & OA = OTG. 18:00. 7/13/2023 T/I/O = SSV/20/15. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No AL. No S-riser. RU to Hoke valve installed on IC test port. Pumped 3 gun loads of greenstick into test void, no Greenstick returns from off side SBS. SV,WV, SSV = C. MV = O. IA & OA = OTG. 13:00 Daily Report of Well Operations PBU H-04B () Pumped 3 gun loads ofg greenstick into test void, no Greenstick returns from off side SBS Pumped 4 loads of Greenstick (self mold) plastic into test void Pumped 8 gun loads of Greenstick (Self mold) plastic into test port Greenstick IC test void 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-04B Attempt Wellhead Sealant Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 211-085 50-029-20104-02-00 14589 Intermediate Liner Liner Liner 9009 9993 1808 562 3887 9580 13-3/8" x 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 7298 19 - 10012 9517 - 11325 10789 - 11351 10694 - 14581 19 - 7625 7251 - 8623 8210 - 8645 8141 - 9008 None 1950, 4760 7020 10530 11780 9580 3450, 6870 8160 10160 11200 14321 - 14491 5-1/2" 17# x 4-1/2" 12.6# L80 18 - 11325 9012 - 9005 Surface 2296 18-5/8" 20 - 2316 20 -2316 5-1/2" Baker HB Packer 9431, 7188 9431 7188 Torin Roschinger Area Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com 907.564.4891 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 18 - 8623 IC Test Void in Wellhead at Surface Pump 62-cups of Greenstick packing Well Not Online Well Not Online 450 250 0 0 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 10:32 am, Jun 26, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.26 05:51:29 -08'00' Torin Roschinger (4662) RBDMS JSB 071123 WCB 1-9-24 DSR-6/28/23 ACTIVITY DATE SUMMARY 6/2/2023 T/I/O = SSV/465/475. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No S- riser, no AL. IA FL @ near surface, OA FL @ surface. Bleed IAP to BT to 0 psi (3.5 hrs) (gas/fluid). Bled OAP to 0 psi in 15 min. Returned 1.5 bbls fluid. Stung into IC test void (200 psi), bled void to 0 psi. Installed Hoke valve on test port, Pumped through void w/ hyd fluid, good returns from off side port. Installed PKG gun to test port. Pumped 3 gun loads of Greenstick PKG into test port. Will continue 6/3/23. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:30 6/3/2023 T/I/O = SSV/20/17. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No AL. No S-riser. IAP increased 20 psi, OAP increased 17 psi overnight. RU to Hoke valve on IC test port. Pumped 12 gun loads of Green stick into IC test void for a total of 15 loads pumped. No returns from off side port. SV, WV, SSV = C. MV = O. IA & OA = OTG. 17:30. 6/4/2023 T/I/O = SSV/60/20. Temp = SI. Greenstick IC test void (Eval TxIAxOA). No AL. No S-riser. IAP increased 40 psi, OAP increased 3 psi over night. RU to Hoke valve on IC test port. Pump 16 gun loads of Greenstick into IC test void. No returns from off side port. Pumped a total of 31 gun loads of Green stick in total. SV, WV, SSV = C. IA & OA = OTG 17:45 Daily Report of Well Operations PBU H-04B Greenstick IC test void ) RU to Hoke valve on g IC test port. Pumped 12 gun loads of Green stick into IC test void for a total of 15 loads pumped. ( Stung into IC)(g )g test void (200 psi), bled void to 0 psi. Installed Hoke valve on test port, Pumped () through void w/ hyd fluid, good returns from off side port. Installed PKG gun to testgyg port. Pumped 3 gun loads of Greenstick PKG into test port ) RU to Hoke valve ong IC test port. Pump 16 gun loads of Greenstick into IC test void. No returns from offg side port. Pumped a total of 31 gun loads of Green stick in total. 0 -0 00 17 D D N D o v r -I ' P.3 VS m 0 XD z = 0, 0 C7 N 'O w W - 00x- — W C7 0 m '4030 N d > m D 000 N o m m Q m o S = d = * * * ,..000 " 1Appm3 ` T � STC- A7CO to 1. _.. .)m - W3. 0 * * * vw � 3mP2N▪ ' AW -.. g. � ro ^' N � m A o " Q° "3 Egg * 2c ' D � 0 > '1WW ° n °� yDDrO W - ori N m o fQ �, ° - m m �° - wow = - 0 2. c X m � �o N C) W W D W W W D W W W W W W w w w W W W W W m P-. M° A -sm (n-c010m ° X0OC -1n too 1 y m c- x 2 M m x 0 -ic- -1 L -I L N W Y O 000000000 0 0 0 0000000 0 0 Q O C�CCO w vw 00, -. 0 W OV 0 W A p O -, ... # 5 00, -. 4:0 - 001,34. m V W O 03 ,0 -4 O (00. 0 N ' z m pxmcWxx3mmm3m3xxxx33x O mmmocnmmmmmmmmmmmmmmmm 3 w cn w g 1 w w 3 w w w 3 w 3 w w w w 3 3 w �', mmm„ wmm mmm m mmmm m z zizzx - xx xxx 71OxzxxOOx C7 « < w0 « M « < x « «<. „ < x W 000 -1300 -< 000 -< 0 "< 0000 { < O 1m m 73 X 7 D 00x/ 137/ 00 X 00 x 7) 00 00 C `< www , w w 3 w w w 3 w 3 w w w w 3 3 w 2 00 > > >-i -I W 11m -Di -1 -iv -iv -D-1 -1 -DiDvv -4 2 T CCC O c C m C c c m c m C c C c m m c G) cr D D D D p a _I � -_i -I -4 _1 -I 1 _1 -Ii1 11 � r -I _i _1 1 z m o O O o o m 0 0 0 m o m O 0 0 0 m m o ° m zzz zzvzzzozvzzzzooz o c n 1 -11 -41z �� -4z � z1 -I - -4zz - o, i O 000 o o m 0 0 0 m o m 0 0 0 0 m m o u v 000 o O C 0 0 0 C O C 0 0 0 0 C C 0 q c -< rrr r . . . . . . . 1 r r r -I -1rr m r r r r r W r r r - r W r r r r W r > 000 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 o s C) 00G) 00z000z0z0000z z0 o C p 0 0 0 00 C nn C 1 mum ( )• rn 4 1 a O w m w M 01 t0 O1 T W W O A V, ,, www V V nwLLDDDLL JnD• J OLDDOLLiDL 0 r cv ' : a » c . m mmJ7w997ro ' a : 9 = o J �i ' J . J J.i J O J CO I- > 1%3 > - DND 0 m 0 N , o 0 3 w 3 ( T x- - O 'O • N 6 = co m 3 m > m A. = w # Dw m - o CC c W=co mW Cw a - O0c (n D W (r) .='. AVN sr,S = I° N7 IvcW A M W eMD OW C:, z U W d o 5. oc am --. - N '40 N N O C 0 3 3 D Z NNN r--' N I ty:ok ('l V 17i ck (4-04/3 Regg, James B (DOA) ZsIO1553 From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator@bp.com] 6 t Sent: Thursday, January 05, 2012 8:18 PM I t ' To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad SW; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr Cc: Walker, Greg (D&C); Olson, Andrew Subject: NOT OPERABLE: H-04B (PTD#2110850) SC Leak Confirmed All, Producer H-04B (PTD#2110850) passed an MIT-IA proving two competent barriers to formation. However, while pressures were being bled after the MIT, fluid returns were seen in the conductor. An MIT-OA was performed to evaluate and fluids were returned to surface from the conductor during the MIT-OA confirming a surface casing leak. The well is reclassified as Not Operable and should remain shut in until repairs are conducted and integrity is restored. Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling &Wells Well Integrity Office: 907.659.5102 Email: AKDCWelllntegrityCoordinator@BP.com From: AK,D&C Well Integrity Coordinator Sent: Monday,December 19,2011 2:01 PM To: 'Regg,James B(DOA)'; 'Maunder,Thomas E(DOA)'; 'Schwartz,Guy L(DOA)';AK,0. GC2 OSM;AK,OPS GC2 Field O&M TL;AK,OPS GC2 Wellpad Lead; AK,OPS Well Pad SW;AK,OPS Prod Controllers;Cismoski,Doug A; Daniel, Ryan;AK,D:' Wireline Operations Team Lead;AK,D&C Well Services Operations Team Lead;AK,RES GPB West Wells Opt Engr;AK,RES GPB East Wells Opt Engr Cc: AK,D&C Well Integrity Coordinator; King,Whitney;Vazir,Mehreen; Le:•ron,Michael 3 Subject: UNDER EVALUATION: H-04B(PTD#2110850)IA Pressure E eeding 45%of Burst Rating All, Producer H-04B (PTD#2110850)was found t. ave exceed 45% of the burst rating of the production casing on 12/17/2011. The wellhead pressures recor• -d for the tubing/IA/OA were 950/1680/0 psi on 12/17/2011. The production casing in H-04B is 13-3/8"68# K-55 whic as a burst rating of 3450 psi. The IA pressure recorded on 12/17/2011 was 48.7% of the burst rating. In accordan • with Conservation Order#492, which requires notification to the AOGCC within 3 working days for sustained casing • essure observation in excess of 45%of the burst rating, the well is reclassified as Under Evaluation. The pressure ri - may be the result of a slow temperature rise the well has seen as seen in the one month graph, but will be treated potential TxIA communication until proven otherwise. Recent Well Events: 11/04/2011: Well passed,MIT-IA to 2400 psi 10/10/2011: CTD Sidetrack complete 09/07/2011: Well passed MIT-IA to 2500 psi 07/28/2011: Passec/PPPOT-T 1 /,. Pga. i4 -04g • 1)7h Z4IOS567 Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator@bp.com] eco'! Sent: Monday, December 19, 2011 2:01 PM ll CC To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L(DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad SW; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr Cc: AK, D&C Well Integrity Coordinator; King, Whitney; Vazir, Mehreen; LeBaron, Michael J Subject: UNDER EVALUATION: H-04B (PTD#2110850) IA Pressure Exceeding 45% of Burst Rating Attachments: H-04B (PTD#2110850)TIO Plot for last 3 months.doc; H-04 (PTD#2110850) IA Pressurization.xls; H-04B (PTD#2110850)wellbore schematic.pdf All, Producer H-04B (PTD#2110850) was found to have exceed 45% of the burst rating of the production casing on 12/17/2011. The wellhead pressures recorded for the tubing/IA/OA were 950/168070 psi on 12/17/2011. The production casing in H-04B is 13-3/8"68# K-55 which has a burst rating of 3450 psi. The IA pressure recorded on 12/17/2011 was 48.7% of the burst rating. In accordance with Conservation Order#492, which requires notification to the AOGCC within working ays for sustained casing pressure observation in excess of 45%of the burst rating, the well is reclassified as Under Evaluation. The pressure rise may be the result of a slow temperature rise the well has seen as seen in the one month graph, but will be treated as potential TxIA communication until proven otherwise. Recent Well Events: 11/04/2011: Well passed MIT-IA to 2400 psi 10/10/2011: CTD Sidetrack complete 09/07/2011: Well passed MIT-IA to 2500 psi 07/28/2011: Passed PPPOT-T A 3 month TIO plot, a 1 month TIO plot with a flowline temperature plot, and wellbore schematic have been included for reference. «H-04B (PTD#2110850) TIO Plot for last 3 months.doc» «H-04 (PTD#2110850) IA Pressurization.xls» «H-04B (PTD#2110850)wellbore schematic.pdf» Proposed plan forward: 1. DHD: Bleed IAP to 500 psi and monitor for 7 days for IA repressurization 2. Fullbore: If IA shows signs of repressurization, MIT-IA to 2500 psi 3. E-Line: Pending results of the failed MIT-IA, leak detect log In the event that the IA pressurization is not the result of a thermal event, all remediation work will require the submission of a sundry(10-403) prior to its initiation, per CO 492. Please call if you have questions or concerns. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907)659-5102 Cell (907) 752-0755 Pager(907) 659-5100 Ext. 1154 1 f 4 t. CU 3 co co N N N ' N 's 7 2 Cl- co � (2 Q) y N CV C N d C. Q H I (A 6ep)ein;eiedwal 0 o in rn CO CO in oN- co co d • X o��� `mac' i • !! ! d • ■ :-AI `'�! ! E . ■0. O� H • a !! `'c! w • oc . C • <2....._________________iii !! !'?! C v • $( °c'i t4 -J c' u. O ♦ 111 x ! ! `o (75 • is, a G' 2 • ■- '. c ! c d 00 • T c', y o ��� m • +off ;xX ! �! a 4 • X 0&! i� C) • a !! ! 1— • 0c' a '6 00 • Olt: ! e./ p • x ''c I • ■ x << �!! • ■ x O��s • 1 x 1` moi!! Oc'i , • '1 X !! c'!! • :1 > oci! `'! • :1 x 1 2 ! oc 0 C 0 oO O C 0 0 0 0 0 0 0 o O O o o O O �!� O CO CO N O CO CO d N � (N r r r r r -s • Q ao 000 C I-�0000 1■ I N O C0 [D 0 N 1 acn N O (N N O 0 O 0 O O O O a a N 0 0 � O oo O .--4 - ~ ~ H O O O O � Q o\ ,TREE= r 6-3/8"CNV WELLHEAD= MCEVOY H -04 B SAFETY NkS:WELL ANGLE>70°@ 11748'*** ORIGINAL&H-04A WELLBORES NOT SHOWN ACTUATOR= BAKER C ORIG KB.ELEV= 64.44' ORIG BF.ELEV= 45' I I BELOW WHIPSTOCKS*** KOP= 2600' 2000' -I5-1/2"CA MCO"BAL-O"SSSV Max Angle= 98°@ 14300' .....t1 LAND NIP,ID=4.562" Datum MD= 11649' 30"CEMENTED 100' \ 2244' —9-5/8"DV PKR Datum ND= 8800'SS CONDUCTOR c.�� 2293' —13-5/8"X 9-5/8"XO,ID 8.681" 13-3/8"CSG,684,K-55 SEAL-LOCK, — 2293' , GAS LIFT MANDRELS ID=12.415" ST MD TVD DEV TYPE VLV LATCH PORT DATE 18-5/8"CSG,96.54,K-55 BUTT, ID=17.655" H 2316' 2 3018 3005 18 OTIS DMY RM 0 09/07/11 1 5512 4747 54 OTIS DMY RM r 0 09/07/11 Minimum ID = 1.78" @ 10700' I I 9363' H5-1/2"OTISX NIP,ID=4.562" STEEL BUSHING IN DEPLOYMENT SLEEVE9415'_1—I TBG SEAL ASSY, ID=? Z 9431' —9-518"X 5-1/2"BKR HB PKR,ID=4.00" 5-1/2"TBG,17#,L-80,.0232 bpf,ID=4.892" — 9431' —\ / 9438' —15-1/2"X 4-1/2"XO,ID=3.958" 9-5/8"X 7"TIEBACK,ID=? — 9517' 9-5/8"X 7"LNR TOP PKR, ID=? — 9556' 9556' —9-5/8"X 7"TM/LTP&LNR HGR,ID=? 9-5/8"CSG,47#, N-80 SEAL-LOCK, ID=8.681" --1 10012' I il 10681' —4-1/2"BKR 45 KB LTP,ID=2.37"(11/02/11) 10694' —3.70"X 3.00"DEPLOY SLV,ID=3.00" Z C 10700' H 3.00"X 2.25"DEPLOY SLV, ID=1.78" TOP OF 2-3/8"LNR ---1 10700' r ♦ 10789' —BKR LOCATOR SUB,ID=2.390" TOP OF 2-7/8"LNR H 10793' •• • 10793' 1-13-1/2"BKR DEPLOY SLV,ID=3.00" BEHIND 3-1/2"LNR,8.814, L-80 STL, -{ 11315' i :� 0087 bpf, ID=2.992" 4. 10802' —13-1/2"X NIP,ID=2.813" CEMENT I. g. 4-1/2"TBG,12.6#,L-80, .0152 bpf,ID=3.958" —11325 i 11304' —1 HOWCO XN NIP w/RA MKR,ID=2.75" 4-1/2"WHIPSTOCK w/RA TAG @ 11332' 11325' 4' 11315' —13-1/2"X 3-3/16"XO, ID=2.786" 1 7"LNR,29#, N-80 SEAL-LOCK, — — 11325 t, .0371 bpf,ID=6.276" •' j V ♦ MILLOUT WINDOW(H-04A) 11325'- 11333' 3-3/16"LNR,6.2#,L-80 TCII, --11352 V J. .0076 bpf,ID=2.805" 3-3/16"WHIPSTOCK(09/19/11) —I 11352' / MILLOUT WINDOW(H-04B) 11351'-11357' PERFORATION SUMMARY REF LOG:MCNL/CCL/GR ON 10/06/11 TIE-IN LOG: GEOLOGY PDC LOG — ANGLE AT TOP PERF:96°@ 14320' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE — 1.56" 6 14320- 14490 0 10/18/11 14494' — PBTD ♦•♦ 2-3/8"LNR,4.7#,L-80 STL,.0039 bpf, ID=1.995" —{ 14581' .♦4 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/18/77 ORIGINAL COMPLETION 10/19/11 DGD/JC FINAL DRLG CORRECTIONS WELL: H-04B 01/13/90 D-16 RWO 11/12/11 CJN/PJC SET BKR KB LTP(11/02/11) PERMIT No: 2110850 11/28/03 NORDIC 1 CTD SIDETRACK(H-04A) 12/14/11 AK/PJC DRLG CORRECTIONS API No: 50-029-20104-02 10/10/11 NORDIC 1 CTD SIDETRACK(H-04B) SEC 21,T11 N,R13E,873'FNL&1265'FEL 10/15/11 PJC DRLG DRAFT CORRECTIONS 10/17/11 MS/PJC PBTD CORRECTION BP Exploration(Alaska) McMains, Stephen E (DOA) dMINSINOW01111.00===PIEWI MINIM From: Hubble, Terrie L iTerrie.Hubble@bp.com] Sent: Monday, November 28, 2011 2.23 PM To: McMains, Stephen E (DOA) Subject: PBU H-04B / PTD#211-085 Irrt— if - C 5 Hi Steve, ( Please reference the following well: Well Name: PBU H-04B Permit #: 211-085 API #: 50-029-20104-02-00 Date of Test: 11/17/11 Type of Test: IPT (Initial Production Test) Choke Size: 96 Choke Unit: Degrees Production Method: Flowing Duration (Hours Tested): 6 Top Reference (Top Perf MD): 14,320' Bottom Reference (Bottom Perf MD): 14,490' Tubing Flowing (Pressure): 220 Casing Pressure: 240 Total Test (Rate f/ 0, W, G): 138 81 3,544 24-Hour Rate (0, W, G): 553 324 14,177 Gravity (Oil, API): 31.9 Degrees GOR (Gas-Oil Ratio): 25,626 This well began Production on November 16, 2011 Method of Operations on this date: Flowing STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Abend.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 11/3/2011 211-085 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 9/20/2011 50-029-20104-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Cf Surface: 10/2/2011 PBU H-04B 873'FNL, 1265'FEL, SEC.21,T11 N, R13E, UM 8. KB(ft above MSL): 64.40' 15.Field/Pool(s): Top of Productive Horizon: 960'FSL,3949'FWL, SEC. 15,T11 N, R13E, UM GL(ft above MSL): 39.72' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 945'FSL, 1969'FWL, SEC. 15,T11 N, R13E, UM 14494' 9005' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 643315 y- 5959915 Zone- ASP4 14589' 9009' ADL 028284 TPI: x- 648488 y- 5961849 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 646509 y- 5961796 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/1 VD: MWD DIR, GR, RES, GR/CCL/MCNL 11351' 8645' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE Top I BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 30" Conductor Surface 100' Surface 100' 36" 300 sx Permafrost II 18-5/8" 96.5# K-55 Surface 2316' Surface 2316' 24" 4800 sx Permafrost II 13-3/8"x 9-5/8" 68#/47# K-55/N-80 Surface 10012' Surface 7625' 12-1/4" 740 sx'G'.200 sx'G',2170 sx PF II 7" 29# N-80 9517' 11322' 7251' 8621' 8-1/2" 1140 sx Class'G' 3-1/2"x 3-3/16" 8.81#/6.2# L-80 10790' 11351' 8211' 8645' 4-1/8" 157 sx Class'G' 2-3/8" 4.7# L-80 10694' 14581' 8141' 9008' 3" 69 sx Class'G' 24. Open to production or injection? ® Yes 0 No 25. TUBING RECORD If Yes,list each interval open (MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/ND) 1.56"Gun Diameter,6 spf 5-1/2", 17#, L-80 9431' 9431'/7188' MD TVD MD TVD 4-1/2", 12.6#, L-80 9431'- 11351' (Below K/O) 14320'-14490' 9012'-9005' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. I 'III ) DEPTH INTERVAL(MD)I AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protected w/60 Bbls of Diesel 4' IE.C. 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize Iithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None .R.ECEIVSD' RBDMS NOV 15 2011 NOV 1 5 ZOO, Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Alaska Oil&Gas Cons.Comrm ' //►► y 7 Submit Original OnIyV 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. .-JRMATION TESTS NAME MD TVD Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 42SB/Zone 4A 11428' 8709' None Top CGL/Zone 3 11515' 8778' Base CGL/Zone 2C 11620' 8847' 23SB/Zone 2B 11805' 8925' 22TS 12519' 8976' 21TS/Zone 2A 13004' 9037' HOT 13045' 9041' 21TS/Zone 2A(Inverted) 13165' 9038' Formation at Total Depth(Name): 22TS(From Base) 13165' 9038' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. �/ Signed: Terrie Hubble • nn^ . Title: DrillingTechnologist Date: t[ /II 9 �/Uu � �L�16� 9� PBU H-04B 211-085 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Permit No./Approval No. Drilling Engineer: Mark Staudinger,564-5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America -ALASKA - BP Page 1 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00©64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/29/2011 14:00 - 19:00 5.00 MOB N RREP PRE PJSM. INSTALL SCOPING RAM IN DERRICK. RIG MOVE FROM K-PAD TO H-PAD. 19:00 - 19:30 0.50 MOB P PRE PREP AND SECURE CELLAR AND BOP STACK FOR RIG MOVE. 19:30 - 20:00 0.50 MOB P PRE PJSM TO MOVE RIG OFF WELL. 20:00 - 20:30 0.50 MOB P PRE MOVE RIG OFF WELL. CREW CHANGE. 20:30 - 21:00 0.50 MOB P PRE PJSM TO MOVE RIG TO H-PAD. 21:00 - 00:00 3.00 MOB P PRE MOVE RIG FROM K-PAD TO H-PAD. 8/30/2011 00:00 - 08:30 8.50 MOB P PRE FINISH RIG MOVE FROM K-PAD TO H-PAD. SPOT RIG ON H-PAD OUT OF THE WAY. 08:30 - 00:00 15.50 MOB N RREP PRE WAIT FOR INDEPENDENT INVESTIGATION CREW TO PERFORM INVESTIGATION ON PUMP OVER PRESSURE,POP OFF SHEARING AND LINE PARTING DOWN STREAM OF POP OFF. FINISHED SCOPING DOWN DERRICK RAM. REMOVED CATWALK RAM. SPOTTED CUTTINGS BOX. TESTED MUD PUMP CHECK VALVES TO 500 PSI FOR 30 MINUTES. UNLOADED TRAILERS. CLEAN RIG. 8/31/2011 00:00 - 00:00 24.00 MOB N RREP PRE INDEPENDENT INVESTIGATION.CLEAN RIG AND CHANGE OUT TOTCO SYSTEM. DISASSEMBLED MANUAL CHOKE FOR INSPECTION.WAIT ON ORDERS FROM TOWN. 9/1/2011 00:00 - 00:00 24.00 MOB N RREP PRE WAIT ON ORDERS FROM TOWN. CLEAN RIG.REPAIR AIR REGULATOR. SPOTTED NORDIC RIG 2 WELDING SHOP. 9/2/2011 00:00 - 05:00 5.00 MOB N RREP PRE WAIT ON ORDERS FROM TOWN.CLEAN RIG. MEASURE AND REMOVE POP OFF LINES. 9/3/2011 00:00 - 00:00 24.00 MOB N RREP PRE WORK ON FABRICATING AND INSTALLING NEW POP OFF LINES ON RIG PUMPS#1 AND #2.SEALING UP AND CLEANING RIG. 9/4/2011 00:00 - 00:00 24.00 MOB N RREP PRE FABRICATING AND INSTALLING NEW POP OFF LINES.PAINTING INSIDE OF RIG AND OUTSIDE OF WELDING SHOP. 9/5/2011 00:00 - 14:00 14.00 MOB N RREP PRE FABRICATING AND INSTALLING NEW POP OFF LINES. INSTALL PIPE CLAMPS ON 2" HARDLINE IN PIPE SHED. PAINTING INSIDE OF RIG. 14:00 - 00:00 10.00 MOB N RREP PRE INSTALL RUBBER ON PIPE SHED DOOR. X-RAYING WELDS ON POP OFF LINES BEFORE INSTALLATION. 9/6/2011 00:00 - 05:00 5.00 MOB N RREP PRE FABRICATING NEW POP OFF LINES. X-RAYING WELDS ON POP OFF LINES BEFORE INSTALLATION. 05:00 - 18:00 13.00 MOB N RREP PRE 1 WELD FAILED AND HAD TO BE REWELDED. AT 18:00 WE HAVE 5 WELDS LEFT TO XRAY 18:00 - 00:00 6.00 MOB N RREP PRE CONTINUING WITH XRAY OF WELDS BEFORE INSTALLATION ONTO RIG. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 2 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/7/2011 00:00 - 06:00 6.00 MOB N RREP PRE XRAY WELDS FOR DOWNSTREAM PIPING FROM PUMP PRESSURE RELIEF POP-OFF VALVES 06:00 - 00:00 18.00 MOB N RREP PRE CONTINUE TO XRAY WELDS ON DOWNSTREAM PIPING. TWO WELDS FAIL INSPECTION. RE-WELD,RE-XRAY. INSTALL PIPING ON PUMP ONE. HYDRO-TEST TO 5000 PSI. PASSED. ALL PIPING PASSED AND ON LOCATION AT MIDNIGHT. 9/8/2011 00:00 - 02:00 2.00 MOB N RREP PRE INSTALL PIPING. PRESSURE TEST TO 5000 PSI. GOOD TEST. 02:00 - 06:00 4.00 MOB N RREP PRE INSTALL,WELD SUPPORT BRACKETS FOR PIPING. 06:00 - 19:00 13.00 MOB N RREP PRE CONTINUED WELDING BRACKETS TO PRESSURE RELIEF LINES FOR MUDPUMPS 1 AND 2. WELLS GROUP PREPARED H-04B FOR RIG: GREASED&TESTED TREE VALVES AND SET TWO-WAY CHECK VALVE. 19:00 - 21:00 2.00 MOB N RREP PRE CONDUCTED MEETING WITH NORDIC,SLB, AND BP REPRESENTATIVES REGARDING IMPROVED PROCESS FOR OPERATING PUMPS ON RIGS AND AVOIDING ACCIDENTAL OVER-PRESSURING OF POP-OFF VALVES. -SLB SUBMITTED COURSE OF ACTION FOR TESTING AND IMPROVING OPERATOR COMPETENCY. -TEAM AGREED ON IMPORTANCE FOR DECREASING DISTRACTIONS FOR COIL TUBING OPERATOR AND IMPROVING AND INCREASING COMMUNICATIONS BETWEEN COIL OPERATOR AND NORDIC DRILLER WHEN ASSIGNING,UTILIZING,AND SETTING TRIPS FOR PUMPS. -THE USE OF AN ENGINEERING CONTROL AS A REMINDER TO EITHER NOT USE OR TO QUESTION PUMP TRIPS WAS AGREED UPON AND WILL BE IMPLEMENTED ON BOTH RIGS. CALLED IN TO BP CTD LEAD WITH MEETING CONCLUSIONS AND AGREEMENT BY ALL PARTIES THAT NORDIC 1 AND 2 HAD A PLAN TO SAFELY RETURN TO WORK. PERMISSION GRANTED TO RETURN TO WORK. AOGCC GIVEN 24-HOUR NOTICE FOR BOP TEST ON NORDIC 1. 21:00 - 00:00 3.00 MOB N RREP PRE BEGIN WARMING UP MOVING SYSTEM ON RIG. BEGIN RIG PREP FOR MOVE. MOVE SATELLITE CAMP,WELDING SHOP OUT OF MOVE ROUTE. BEGIN LAYING MATBOARDS DOWN ACROSS UTILIDOR AREA. 9/9/2011 00:00 - 01:00 1.00 MOB N RREP PRE COMPLETE LAYING DOWN MATTING BOARDS. PJSM ON RIG MOVE. IDENTIFY PERSONNEL PLACEMENT,DUTIES. 01:00 - 03:00 2.00 MOB P PRE MOVE RIG OVER H-04B. RIG ACCEPT 0300 HRS. 03:00 - 06:00 3.00 BOPSUR P PRE STAGE WELDING SHOP. NU BOP. RU HARDLINE TO TIGER TANK,PRESSURE TEST. 06:00 - 06:30 0.50 BOPSUR P PRE CREW CHANGE,PJSM AND CONTINUE 06:30 - 10:00 3.50 BOPSUR P PRE NU SPACER SPOOL,BOP'S,LUBRICATOR AND DRIP PAN ON RIG FLOOR Printed 10/17/2011 1:47.58PM North America -ALASKA- BP Page 3 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972 00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 10:40 0.67 BOPSUR P PRE NU COMPLETE FLUID PACK STACK AND _SHELL TEST FOR REEL BLOW DOWN LOU GRIMALDE WAIVED WITNESSING THE BOP TEST 10:40 - 11:00 0.33 RIGU P PRE PJSM TO BLOW DOWN THE REEL 11:00 - 11:45 0.75 RIGU P PRE PREP TO PU INJECTOR AND MU TO LUBRICATOR 11:45 - 12:45 1.00 BOPSUR N RREP PRE KR VALVE ACCUMULATOR ON THE KOOMEY WAS REPLACED DURING SUMMER MAINTENANCE AND HAS A LEAK. REPLACE 12:45 - 14:00 1.25 RIGU P PRE LINE UP TO PUMP 1 VOLUME OF FRESH WATER THEN 30 BBLS OF INHIBITED WATER AND 5 BBLS OF NEAT METHANOL LINES ARE FLUID PACKED,SHUT IN AND PT, GOOD PT CTS SERVICE QUALITY COACH IS HERE ASSESSING MATT LINK ON HIS PUMPING SKILLS COOL DOWN N2 14:00 - 14:30 0.50 RIGU P PRE ALL FLUIDS HAVE BEEN PUMPED,LINE UP TO PUMP N2 AT 1800 SCF/MIN COMMENCE PUMPING N2 INTO CT REEL AT —1,800PSI CIRC PRESSURE.RECEIVED GOOD INDICATION FOR N2 HAVING CLEARED COIL WITH 33BBLS BLOWN DOWN(MEASURED ON "OUT'MM). ISOLATE N2 PUMP AND RIG DOWN. 14:30 - 15:00 0.50 RIGU P PRE N2 DOWN ON PUMP ALLOW COIL PRESSURE TO BLEED OFF 15:00 - 15:15 0.25 RIGU P PRE HOLD AAR FOR PUMPING OPS AND PJSM FOR UNSTABBING COIL FROM INJECTOR HEAD. 15:15 - 15:40 0.42 RIGU P PRE UNSTAB INJECTOR HEAD FROM RISER AND PICK UP. CUT OFF NOZZLE,SMOOTH WELDING SEAM AND INSTALL NIGHT CAP. INSTALL GRAPPEL CONNECTOR TO UNSTAB COIL. 15:40 - 17:30 1.83 RIGU P PRE PULL OIL BACK TO REEL AND SECURE. 17:30 - 17:40 0.17 RIGU P PRE REEL SECURED,PREP TO PULL REEL IRON 17:40 - 18:00 0.33 MOB P PRE PERFORM RIG EVAC DRILL WITH DAY CREW 18:00 - 18:15 0.25 RIGU P PRE CREW CHANGE 18:15 - 21:30 3.25 RIGU P PRE PREPPING FOR REEL SWAP 21:30 - 00:00 2.50 RIGU P PRE PJSM FOR REEL SWAP. DROP REEL. TROUBLE GETTING TRUCK TO RELEASE FROM PINTLE IN ORDER TO DROP TRAILER AND PU OTHER TRAILER. RESOLVED. PU NEW TRAILER,SPOT REEL UNDER REELHOUSE. PU,PLACE AND SECURE NEW REEL. ORIENT REEL FOR NEXT OPERATION. 9/10/2011 00:00 - 00:30 0.50 RIGU P PRE ORIENTING AND SECURING REEL. STAGE HARD IRON. 00:30 - 01:00 0.50 RIGU P PRE RIG EVACUATION DRILL. CREW RESPONSE TIME 2 MIN TO REACH PRE-DETERMINED RIG EVAC SITE. CONDUCT AAR. • • Printed 10/17/2011 1:47 58PM North America -ALASKA- BP Page 4 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 04:00 3.00 RIGU P PRE PJSM ON PULLING COIL ACROSS. INSTALL GRAPPLE,PULL TEST. PULL ACROSS. STAB INTO INJECTOR. REMOVE GRAPPLE,SET INJECTOR OFF TO SIDE. BEGIN MU INNER REEL IRON, INSTALL PRESSURE BULKHEAD, TEST E-LINE. 04:00 - 06:00 2.00 BOPSUR N HMAN PRE PREP TO CONDUCT BOP TEST AOGCC "'INSPECTOR LOU GRIMALDI WAIVED WITNESS. VISUAL INSPECTION OF EQUIPMENT,BEGIN TEST OF VALVES. 06:00 - 07:00 1.00 BOPSUR N HMAN PRE CREW CHANGE,PJSM TO CONTINUE TESTING BOPE 07:00 - 10:00 3.00 BOPSUR N RREP PRE PRIOR TO TESTING CHOKE VALVE#11 THE VALVE WAS FUNCTIONED AND A GRINDING WAS NOTICED.PULLED VALVE TO INSPECT AND THE PLATE INSIDE IS SCARRED,DUE TO THE PLATE BEING INSTALLED UPSIDE-DOWN AFTER BEING REBUILT IN TOWN. VALVE I WAS REBUILT AND TESTED GOOD. 10:00 - 11:00 1.00 BOPSUR N HMAN PRE PT REBUILT VALVE CHOKE VALVE ✓ 11:00 - 13:25 2.42 BOPSUR P PRE CONTINUE TESTING BOPE • 13:25 - 17:00 3.58 BOPSUR P PRE KICK WHILE DRILLING DRILL W/PACK-OFF FAILURE AFTER SHUT IN.CONTINUE BOP .i2. TEST 17:00 - 17:25 0.42 BOPSUR P PRE BOP TEST COMPLETED BOP'S FUNCTION TESTED FROM BOTH 10 STATIONS DRAW DOWN TEST SYSTEM PRESSURE=3100 PSI 2000 PSI AFTER SHUT IN 19 SEC FOR 1ST 200 PSI TO 2200 PSI 108 SEC TO FULL SYSTEM RECOVERY 17:25 - 20:30 3.08 RIGU P PRE PREP FLOOR TO CHANGE PACK OFF,MU CTC AND BHI UQC. CONDUCT PULL TEST TO 35K. PULL TEST FAILED. CUT OFF CTC. PREP COIL, RE-INSTALL CTC. CONDUCT PULL TEST TO 35K. GOOD TEST. MU BHI UQC. TEST ELECTRICAL. 20:30 - 23:45 3.25 RIGU P PRE PRESSURE TEST QTS. PRESSURE TEST INNER REEL IRON. FLUID PACK REEL,PUMP SLACK FORWARD. PRESSURE TEST PACKOFFS AND INNER REEL VALVE. POP OFF FROM LUBRICATOR,PRESSURE TEST UQC. INSTALL DOUBLE CHECK VALVES. PRESSURE TEST. 23:45 - 00:00 0.25 BOPSUR P PRE MOBILIZE LUBRICATOR TO RIG FLOOR 9/11/2011 00:00 - 00:30 0.50 BOPSUR P PRE MOBILIZE LUBRICATOR TO RIG FLOOR. 00:30 - 02:00 1.50 BOPSUR P PRE NU LUBRICATOR. PRESSURE TEST LUBRICATOR TO 250 LOW,3500 HIGH. GOOD TEST. Printed 10/17/2011 1:47:58PM North America -ALASKA - BP Page 5 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:45 2.75 BOPSUR P PRE PULL TWC..UNABLE TO PU TWC PULLING TOOL WITH TWC ON IT PAST SWAB VALVE DUE TO"J"STYLE PLUG AND LUBRICATOR CONFIGURATION. CLOSE MASTER VALVE. WELLS GROUP POLICY CALLS FOR CLOSING SSV IN CONJUNCTION WITH INDEPENDENTLY TESTED MASTER VALVE. CONSULTED WITH DWOP,REQUIRES TWO INDEPENDENT BARRIERS FOR OPERATION. CRACK MASTER,NO PRESSURE ON WELL. CONSULT WITH TOWN. DECISION IS TO USE WELLS GROUP SOP TO CLOSE SSV AND MASTER. ND LUBRICATOR,NO TWC. PULLING TOOL PACKED OFF WITH VERY HARD GREASE. CLEAN TOOL. ------- --- 04:45 - 06:00 1.25 BOPSUR P PRE MU NOZZLE ASSEMBLY„MU TO INJECTOR, PT QTS. RIH,CIRCULATE ABOVE TWC TO CLEAN ABOVE TWC. BREAK OFF FROM LUBRICATOR AND STAND BACK INJECTOR. 06:00 - 08:00 2.00 BOPSUR P PRE MU LUBRICATOR AND PRESSURE TEST. RIH, RETRIEVE TWC. 150 PSI ON WELL. CLOSE MASTER,SSV. ND LUBRICATOR. 08:00 - 08:20 0.33 BOPSUR P PRE ORDER 50 BBLS HI-VIS PILL TO 08:20 - 08:45 0.42 BOPSUR P PRE GOOD TEST AGAINST MASTER,BLEED OFF AND CLOSE SSV FOR LEAK TIGHT TEST 08:45 - 09:00 0.25 BOPSUR N SFAL PRE GOOD LTT,PU LUBRICATOR AND TWC RETRIEVED BUT LEFT ONE OF THE LARGE SEALS IN THE WELL.CALL ODE AND SUCK OUT STACK.CALL OUT FOR VENTURI JUNK BASKET BHA WHILE SUCKING OUT STACK 09:00 - 10:00 1.00 BOPSUR N UFAL PRE SUCKED OUT STACK AND SAW 1 PIECE OF WIRE STICKING OUT OF THE FLUID ON TOP OF THE SWAB VALVE.FRAYED THE END OF A 30'CHUNK OF ELINE AND LOWERED IT INTO THE STACK AND RETRIEVED—1/3 OF THE MISSING SEAL.TRIED TWISTING AND TURNING THE ELINE ON TOP OF THE SWAB AGAIN TO SEE IF WE COULD GRAB ANYMORE BUT DID NOT GET ANYMORE. FUNCTIONED THE BOP RAMS TO SEE IF IT WAS IN ONE OF THE CAVITIES AND THEY WERE CLEAN.WO VENTURI JUNK BASKET BHA 10:00 - 11:30 1.50 BOPSUR N SFAL PRE WO TOOLS AND PT NIGHT CAP 11:30 - 11:45 0.25 BOPSUR N SFAL PRE TOOLS ON LOCATION,LOAD ON RIGH THEN HOLD PJSM FOR VENTURI BHA 11:45 - 12:05 0.33 BOPSUR N SFAL PRE PJSM TO OPEN UP WELL AND BH KILL WELL 12:05 - 12:20 0.25 BOPSUR N SFAL PRE OPEN SWAB AND MASTER,WHP AT 140 PSI. CRACK CHOKE TAKING RETURNS TO TIGER TANK TO SEE IF WE HAVE GAS OR FLUID AND IF WHP BLEEDS OFF 12:20 - 12:30 0.17 BOPSUR N SFAL PRE GAS CAP ON WELL WITH SLIGHT BLEED OFF, LINE UP TO KILL WELL 5 BBLS NEAT METH FOLLOWED BY 375 BBLS OF KCL 6.1 BPM @ 1735 WHP Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 6 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type. RE-ENTER-ONSHORE (RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 12:55 0.42 BOPSUR N SFAL PRE 70 BBLS INTO KILL MOTORMAN NEEDS US TO REDUCE OUR RATE TO INVESTIGATE WHY GEN#1 IS GETTING HOT. CIRCULATED 30 BBLS AT REDUCED RATE (3.0 BPM)SHUT DOWN PUMPS,GEN#1 TURBO ON MOTOR IS TURNING CHERRY RED 12:55 - 13:10 0.25 BOPSUR N SFAL PRE AFTER TOOLPUSHER CONFIRMED THAT BOTH GENERATRORS WERE OPERATING WITHIN PARAMETERS HE WANTED TO BRING PUMPS BACK UP TO RATE AGAIN,ZERO BBL COUNTERS RIG GENERATORS OPERATING AT 41% POWER AT 6 BPM 13:10 - 13:30 0.33 BOPSUR N RREP PRE SLOW DOWN PUMP RATES TP WANTS TO REDUCE RATE TO DROP GEN#1,TURBO GETTING HOT. MM CALLED FOR ESD TO BE ACTIVATED TO SHUT DOWN RIG.THE CTS FS SHUT DOWN THE PUMPS AND THE ESD WAS ACTIVATED. I CALLED OUT FOR THE DRILLER TO SHUT IN THE WELL BUT DID NOT GET A RESPONSE,THE CTS FS REPEATED THE ORDER AND HE DID NOT GET A RESPONSE EITHER AND THEN HE CALLED FOR HIS HAND TO SECURE THE WELL BY CLOSING THE SWAB AND MASTER VALVES.THE WELL WAS SECURED AND I LEFT THE OPS CAB TO GO TO THE MOTOR ROOM TO SEE WHAT HAPPENED.AFTER ACCESSING THE SITUATION I MADE CALLS TO 5300 TO REPORT THE FIRE AND THE DISCHARGE OF A FIRE EXTINGUISHER. I THEN CALLED KEN MILLER WHO CALLED THE ADW SAFETY OFFICER AND THEN I CALLED THE GC2 OTL. INCIDENT REPORT:2011-IR-3940535 13:30 - 21:00 7.50 BOPSUR N RREP PRE INVESTIGATE GENERATOR PROBLEMS. MAKE AREA SAFE. ON STANDBY WHILE WAITING ON PARTS. THE FIRE CHIEF AND BP SAFETY OFFICER ARRIVED ON LOCATION AND ASSESSED THE SITUATION. 21:00 - 23:30 2.50 BOPSUR N RREP PRE CHECK VALVE LINE-UPS, INSPECT TREE, INSPECT CHOKE MANIFOLD. LINE UP TO PUMP 50/50 METHANOL FOR FREEZE PROTECT. PUMP ACROSS TOP WITH VALVES CLOSED UNTIL RETURNS ARE ESTABLISHED WITH METHANOL RETURNS THROUGH CHOKE TO TIGER TANK. OPEN UP SWAB AND MASTER, NO PRESSURE ON WELL. RETURNS AT 20 BBLS. BULLHEAD 60 BBLS METHANOL AT 3 BPM,1160-1185 PSI, TO FREEZE PROTECT TO 2500'. FINAL CIRCULATING PRESSURE AT 1140 PSI, IA AT 70 PSI. DOWN ON PUMPS,CLOSE VALVES. 23:30 - 00:00 0.50 BOPSUR N RREP PRE ON STANDBY WHILE WAITING FOR PART FOR GENERATOR. 9/12/2011 00:00 - 04:30 4.50 BOPSUR N RREP PRE WAIT ON GENERATOR PARTS 04:30 - 04:35 0.08 BOPSUR N RREP PRE LINE UP TO PUMP. OPEN UP WELL. NO PRESSURE ON WELL. BRING ON PUMPS TO 2.P BPM,280 PSI. 11 BBLS TO GET RETURNS. LOSS RATE OF 2.2 BPH. SECURE WELL. Printed 10/17/2011 1:47.58PM North America -ALASKA- BP Page 7 of 30 Operation Summary Report tts� Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:35 - 06:00 1.42 BOPSUR N RREP PRE WAIT ON GENERATOR PARTS 06:00 - 09:00 3.00 BOPSUR N RREP PRE CONTINUE WAITING ON GENERATOR PARTS 09:00 - 14:00 5.00 BOPSUR N RREP PRE WELL WORK SHUT DOWN FOR ENGINE ROOM FIRE INVESTIGATION 14:00 - 14:20 0.33 BOPSUR N RREP PRE RAISED CT INJECTOR HEAD ON FEET IN PREPARATION FOR SLICKLINE TO RIG UP. 14:20 - 16:00 1.67 BOPSUR N RREP PRE WAITING FOR SL TO ARRIVE ON PAD. 16:00 - 16:10 0.17 BOPSUR N RREP PRE SL MOVE IN ON PAD. 16:10 - 17:00 0.83 BOPSUR N RREP PRE REMOVE RIG'S OUTSIDE STAIRS. 17:00 - 18:00 1.00 BOPSUR N RREP PRE HOLD PJSM AND LIFT SLB LIFTING VV/LINE GEAR UP TO RIG FLOOR. 18:00 - 22:00 4.00 BOPSUR N RREP PRE ORDER OUT FLUIDS TO KILL WE,J,L. HOLD MEETING WITH SLB, DRILLER,CTD DRILLER TO DISCUSS PLAN FORWARD. CREW CHANGE OUT AT 2000,CONDUCT RIG BRIEF OF PAST EVENTS. 22:00 - 00:00 2.00 BOPSUR N RREP PRE FLUID ON LOCATION. LINE UP TRUCK WHILE PREPARATION FOR WELL KILL. 400 PSI TRAPPED PRESSURE BETWEEN SWAB AND CHOKE. BLEED TO TIGER TANK. BEGIN LINE UP FOR WELL KILL. ATTEMPT TO PRESSURE TEST NIGHT CAP AGAINST SWAB. FAILED. GREASE CREW ALREADY ON LOCATION, CALLED OVER FOR SERVICE. SERVICE BOTH SWAB AND MASTER. TEST VALVES, GOOD. 9/13/2011 00:00 - 03:15 3.25 BOPSUR N RREP PRE OPEN UP WELL.450PSI ON WELL. BULLHEADED KILL WELL WITH 5BBLS NEAT AHEAD.BRING PUMP UP TO 4.25BPM. INITIAL IA PRESSURE 130PSI,TBG PRESSURE 540PSI.FLUID CAUGHT 15BBLS IN.MAINTAIN 4.25BPM, ICP 1210PSI,MAX 2100PSI, FCP 1230 PSI.FINAL IA AT 581 PSI.480 BBLS PUMPED TOTAL DUE TO LOWER PUMP RATE. MONITOR WELL.WELL DEAD. PUMP ACROSS TOP,TOOK 12BBLS TO FILL. FLUID LOSSES AT 11 BPH.PUMP ACRSS TOP TO KEEP HOLE FULL. 03:15 - 03:45 0.50 BOPSUR N RREP PRE PJSM WITH SLB ON MOBILIZING AND MU OF LUBRICATOR AND JUNK BASKET BHA. 03:45 - 04:15 0.50 BOPSUR N RREP PRE MOBILIZE SLB JUNK BASKET BHA TO RIG FLOOR. 04:15 - 06:00 1.75 BOPSUR N RREP PRE PRESSURE TEST MASTER AND SWAB VALVES. RU LUBRICATOR.PRRESSURE TEST LUBRICATOR ASSEMBLY AND QTS. 06:00 - 09:00 3.00 BOPSUR N RREP PRE DO SLB CREW CHANGE, HOLD PJSM AND MU SLICKLINE TOOLSTRING#1 C/W 4.5"OD JUNK BASKET. 09:00 - 09:40 0.67 BOPSUR N RREP PRE FILL LUBRICATOR WITH FLUID AND SUCCESSFULLY PRESSURE TEST TO 300PSV5MIN AND 3,500PSV5MIN. 09:40 - 11:00 1.33 BOPSUR N RREP PRE OPEN SWAB VALVE AND MV-NO WHP. FILL UP WELL WITH 24BBLS WHICH EQUALS A LOSS-RATE OF 5.3BBLS/HR(WELL WAS S/I BETWEEN 05:10AM AND 09:40AM). CIRCULATE ACROSS MUDCROSS. Printed 10/17/2011 1:47.58PM North America -ALASKA - BP Page 8 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 12:30 1.50 BOPSUR N RREP PRE RIG WITH JNUK BASKET TO 5 1/2"X 4 1/2" TBG XOVER,WHILST CIRCULATING ACROSS MUCROSS.286BBLS PVT @ 11:00HRS. 12:30 - 13:00 0.50 BOPSUR N RREP PRE SLICKLINE OOH.CLOSE MV AND PRESSURE-TEST TO 300PS1/65MIN AND 3,500PSV5MIN.269BBL PVT @ 12:30HRS, INDICATING—0.2BPM LOSS-RATE. 13:00 - 13:20 0.33 BOPSUR N RREP PRE CLOSE SWAB VALVE AND PRESSURE-TEST TO 300PSV5MIN AND 3,500PSV5MIN. 13:20 - 13:30 0.17 BOPSUR N RREP PRE BLEED OFF PRESSURE,POP LUBRICATOR. BREAK OUT JNUK BASKET.JUNK BASKET EMPTY, NO REMAINING PARTS OFF THE TWC VALVE'S SEAL RING RECOVERED. 13:30 - 14:00 0.50 BOPSUR N RREP PRE M/U SLICKLINE TS#2 C/W WIRE-BRUSH AND 4.54"OD GAUGE RING.STAB ON LUBRICATOR AND PRESSURE-TEST IN SITU SUB TO300PSV5MIN AND 3,500PSV5MIN. 14:00 - 16:00 2.00 BOPSUR N RREP PRE OPEN UP SWAB VALVE AND MV AND RIG WITH WIRE-BRUSH AND GAUGE RING TO CLEAN X-NIPPLE PROFILE @ 9,363FT. 16:00 - 16:30 0.50 BOPSUR N RREP PRE SLICKLINE TS#2 OOH.239BBL PVT @ 16:00HRS, INDICATING--0.25BPM LOSS-RATE. CLOSE MASTER VALVE AND PRESSURE-TEST TO 300PSV5MIN AND 3,500PSV5MIN. 16:30 - 17:00 0.50 BOPSUR N RREP PRE CLOSE SWAB VALVE AND PRESSURE-TEST TO 300PSV5MIN AND 3,500PSV5MIN. 17:00 - 17:40 0.67 BOPSUR N RREP PRE POP LUBRICATOR AND B/OUT WIRE-BRUSH. FIND FAIR-SIZED PIECE OF THE LOST SEAL-RING IN WIRE-BRUSH. DECIDE TO MODIFY THE WIRE-BRUSH SLIGHTLY(1 7/8"BODY TO ALLOW FOR LONGER WIRES)AND RE-RUN BRUSH IN ATTEMPT TO RECOVER REMAINING PIECES OF SEAL-RING. 17:40 - 18:00 0.33 BOPSUR N RREP PRE M/U SLICKLINE TS#3 C/W WIRE-BRUSH AND 4.54"OF GAUGE RING.STAB ON LUBRICATOR AND PRESSURE-TEST IN-SITU SUB TO 300PSV5MIN AND 3,500PSV5MIN. 18:00 - 20:30 2.50 BOPSUR N RREP PRE OPEN UP SWAB VALVE AND MV AND RERUN WIRE-BRUSH AND GAUGE RING TO CLEAN TBG. KEEP TBG FLUID-FILLED BY PUMPING ACROSS MUDCROSS WITH CHARGE PUMP AT LOW RATE. 20:30 - 21:30 1.00 BOPSUR N RREP PRE BRUSH BHA AT SURFACE.FLUID LEVEL, RETURNS TO SHAKERS. 21:30 - 22:30 1.00 BOPSUR N RREP PRE PRESSURE-TEST AGAINST CLOSED MASTER AND SWAB.GOOD TEST. POP OFF SLB WIRELINE LUBRICATOR. 22:30 - 22:45 0.25 BOPSUR N RREP PRE OPEN VALVES,NO PRESSURE ON WELL. BEGIN TO CIRCULATE TO FILL HOLE AND ESTABLISH LOSS-RATE,GAS ON LEL.SHUT IN TO LINE UP TO TIGER TANK.CIRCULATE AND CATCH RETURNS AT 19BBLS WITH NO SHOW ON LEL.CONTINUE CIRCULATING ACROSS TOP,LINE UP TO PITS,NO LEL. 22:45 - 23:40 0.92 BOPSUR N RREP PRE RIH WITH 2.70"DRIFT BHA ON WIRELINE WHILE PUMPING AT 0.25BPM ACROSS TOP. RIG TO 11,550FT WITH NO PROBLEMS. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 9 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:40 - 00:00 0.33 BOPSUR N RREP PRE POH WITH DRIFT ASSEMBLY 9/14/2011 00:00 - 00:30 0.50 BOPSUR N RREP PRE POH WITH BRIFT ASSEMBLY. t. 00:30 - 01:40 1.17 BOPSUR N RREP PRE TEST MASTER AND SWAB VALVE.GOOD TESTS. 01:40 - 02:50 1.17 BOPSUR N RREP PRE LINE UP TO PUMP FREEZE PROTECT.OPEN VALVES,NO PRESSURE ON WELL.PUMP 50/50 MEATHANOL DOWN ON TOP OF KCL FLUID PACK AT 3.4BPM AGAINST CLOSED CHOKE.CATCH FLUID AT 15BBLS IN. CONTINUE TO PUMP AT 3.25BPM, ICP 450PSI, FCP 1080PSI AT 5OBBLS AWAY.SLOWLY BEGIN TO STAGE.DOWN ON PUMPS FOR LAST 1OBBLS.6OBBLS 50/50 METHANOL PUMPED,FINAL RATE 1.50 BPM,FCP 750PSI. DOWN ON PUMPS.MONITOR WELL,NO PRESSURE ON WELL AND NO FLOW. 02:50 - 04:15 1.42 BOPSUR N RREP PRE CLOSE MASTER AND SWAB AND PT.LD DRIFT BHA, MU 5-1/2"XX PLUG BHA.MU LUBRICATOR.PT QTS.GOOD TEST. 04:15 - 06:00 1.75 BOPSUR N RREP PRE OPEN VALVES.NO PRESSURE ON WELL.RIG WITH 5-1/2"XX PLUG BHA TO 5900FT(AS OF 0515HRS). 06:00 - 08:00 2.00 BOPSUR N RREP PRE SET PLUG IN X-NIPPLE PROFILE @ 9,381 FT SLICKLINE MEASUREMENT. RECEIVED CLEAR INDICATION(WEIGHT LOSS ON WEIGHT INDICATOR),THAT PLUG WAS SET SUCCESSFULLY.POOH INTO LUBRICATOR. 08:00 - 08:45 0.75 BOPSUR N RREP PRE LINE UP AND FLUID-PACK THE TBG ABOVE THE PLUG WITH 22BBLS OF 50/50 METHANOL.PRESSURE-TEST PLUG TO 200PSV5MIN AND 3,500PSV5MIN-ACHIEVE GOOD TEST. 08:45 - 09:15 0.50 BOPSUR N RREP PRE CLOSE MASTER VALVE AND PERFORM PRESSURE-TEST TO 200PSV5MIN AND 3,500PSV5MIN-ACHIEVE GOOD TEST.WELL NOW HAS 2 PROVEN BARRIERS.CLOSE SWAB VALVE. MEANWHILE INVESTIGATION TEAM ARRIVES AT RIG TO START"PRIMARY INVESTIGATION. 09:15 - 09:45 0.50 BOPSUR N RREP PRE TEST SWAB VALVE TO 200PSV5MIN AND 3,500PSV5MIN-ACHIEVE GOOD TEST. _ 09:45 - 11:15 1.50 BOPSUR N RREP PRE HOLD PJSM AND RIG DOWN SLICKLINE EQUIPMENT. LEAVE WELL WITH TRASHCAP ON RISER. 11:15 - 13:15 2.00 BOPSUR N RREP PRE FREEZE-PROTECT CIL WITH 8BBLS OF NEAT METHANOL. 13:15 - 18:00 4.75 BOPSUR N RREP PRE HALT OPERATIONS WHILST WAITING FOR GENERATOR#1-REPAIR AND OUTCOME OF INVESTIGATION. 18:00 - 00:00 6.00 BOPSUR N RREP PRE CONDUCT CREW CHANGE. REFINE AND UPDATE BOP-TESTING PROCEDURE. 9/15/2011 00:00 - 06:00 6.00 BOPSUR N RREP PRE WORK ON UPDATING BOP-TESTING PROCEDURE. REPLACE BLUE WINCH. 06:00 - 00:00 18.00 BOPSUR N RREP PRE GENERATOR TURBO FIRE INVESTIGATION. RESULTS PENDING. WAITING ON ORDERS TO RESUME WORK. Printed 10/17/2011 1:47.58PM North America -ALASKA- BP Page 10 of 30 • Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release. 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:0.4 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/16/2011 00:00 - 07:00 7.00 BOPSUB N RREP PRE CONTINUE TO WAIT ON APPROVAL TO GO BACK TO WORK BASED ON INVESTIGATION FINDINGS. 07:00 - 08:00 1.00 BOPSUB N WAIT PRE BODY TEST ON BOP,WAITING ON AOGCC TO COMMENCE TEST. 08:00 - 09:30 1.50 BOPSUB N SFAL PRE COMMENCE BOPE TEST...,SWAB VALVE APPEARS TO BE LEAKING. 09:30 - 11:00 1.50 BOPSUB N SFAL PRE CALL FOR GREASE CREW. 11:00 - 12:30 1.50 BOPSUB N SFAL PRE GREASE SWAB AND MASTER VALVES. 12:30 - 14:00 1.50 BOPSUB N SFAL PRE ATTEMPT TO TEST,SWAB VALVE LEAKING. -ATTEMPT TO TEST AGAINST MASTER VALVE. 14:00 - 14:30 0.50 BOPSUB N SFAL PRE GREASE PACK BOTH VALVES. 14:30 - 16:00 1.50 BOPSUB N SFAL PRE CANNOT ACHIEVE ANY GOOD TESTS. -CALL OUT FOR CREW TO SET TWO WAY CHECK. 16:00 - 16:30 0.50 BOPSUB N SFAL PRE PRE JOB SAFETY MEETING ON PICKING UP LUBRICATOR AND TOOLS. 16:30 - 17:30 1.00 BOPSUB N SFAL PRE PICK UP LUBRICATOR AND TOOLS. 17:30 - 18:30 1.00 BOPSUB N SFAL PRE PRESSURE TEST LUBRICATOR,PRESSURE TEST TWO WAY CHECK VALVE. -250/3500 PSI,5 MIN EACH. 18:30 - 20:00 1.50 BOPSUB N SFAL PRE R/D LUBRICATOR,FILL TREE,CONDUCT FULL BODY TEST. -250/3500 PSI,OK.NOTIFY AOGCC REP JEFF JONES. 20:00 - 00:00 4.00 BOPSUB N RREP PRE RESUME TESTING BOPE AS PER AOGCC. 9/17/2011 00:00 - 11:00 11.00 BOPSUR N RREP PRE CONTINUE TO TEST BOPE. -TEST ALL CHOKE VALVES AND MUD CROSS VALVE 250-3500 PSV -TEST COMB!RAMS AND BLIND SHEARS @ 250-3500 PSI. -TEST ANNULAR PREVENTOR @ 250-2500 PSI.5 MIN STABALIZED EACH. -(1)FAILURE,KILL LINE SIDE CHECK VALVE, REBUILT SAME. -STATE AOGCC INSPECTOR.JEFF JONES WITNESSED FIRST HALF OF TEST. -PERFORMED DRAWDOWN TEST ON ACCUMULATOR. -ALL FUNCTIONS PERFORMED FROM NORDIC DRILLER'S REMOTE CONTROL PANEL. 11:00 - 14:30 3.50 BOPSUR N RREP PRE PICK UP INJECTOR,PRESSURE TEST INNER REEL VALVE AND PACKOFFS. -250/3500 PSI,5 MIN EACH. -STAND BACK INJECTOR. 14:30 - 17:00 2.50 BOPSUR N RREP PRE PJSM WITH VALVE CREW. -PICK UP LUBRICATOR&MAKE UP TO WELL. -PRESSURE TEST LUBRICATOR,250/3500 PSI,5 MIN EACH,OK. -PULL TWO WAY CHECK,NO PRESSURE BELOW TWO WAY CHECK. -L/D LUBRICATOR AND VALVE SHOP TOOLS. -SENT 0 RING PIECES W/VALVE CREW FOR EVALUATION. -VALVE CREW REPORTED VIRTUALLY 100% RECOVERY ON 0 RING. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 11 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) I Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI: 500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 18:30 1.50 FISH N RREP WEXIT CLEAR AND CLEAN RIG FLOOR. CONDUCT CREW CHANGEOUT. BAKER HAND ON LOCATION. RU TO PRESSURE TEST CHECK VALVES. 18:30 - 20:30 2.00 FISH N RREP WEXIT PRESSURE TEST CHECK VALVES. FAILED. REPLACE CHECK VALVES. PRESSURE TEST GOOD. MU NIGHTCAP, PT. PJSM ON BHA MU WHILE PRESSURE TESTING. GOOD TEST. OPEN VALVES,MONITOR WELL. STATIC. 20:30 - 21:30 1.00 FISH N RREP WEXIT MU PLUG RETRIEVAL BHA:4-1/2"XX PRONG, 5"GS SPEAR, DUAL JARS,XO, BLIND SUB, DPS, EDC, POWERCOMMS,WEAR SUB, LQC, UQC,CTC. MU TO INJECTOR. PT QTS. 21:30 - 23:30 2.00 FISH N RREP WEXIT PJSM ON RUNNING IN HOLE WHILE PT QTS. TEST TRIPS ON BOTH PUMPS. RIH WITH RETRIEVAL BHA. ERRATIC MM READINGS WHILE RIH. WEIGHT CHECK AT 9200'25K. 23:30 - 00:00 0.50 FISH N RREP WEXIT OPEN EDC. CIRCULATE BU TO GET 8.4 PPG KCL ALL THE WAY AROUND. HOLD PJSM ON PULLING PLUG, BULLHEAD OPERATIONS, PULLING UP HOLE TO AVOID SWABBING WHILE CIRCULATING. 9/18/2011 00:00 - 01:30 1.50 FISH N RREP WEXIT CIRCULATE BU TO GET 8.4 PPG KCL ALL THE WAY AROUND. CONFIRMED GAS RETURNS TO TIGER TANK,MONITOR DOWN STREAM AND WELLHEAD PRESSURE. FULL DENSITY AT 210 BBLS,8.4 PPG IN AND OUT. CONTINUE TO TAKE RETURNS TO TIGER TANK FOR ADDITIONAL 15 BBLS. TAKE RETURNS TO PITS,CLEAN. 01:30 - 03:15 1.75 FISH N WAIT WEXIT WAITING ON TRUCK TO ARRIVE WITH ADDITIONAL KCL BEFORE PULLING PLUG AND BEGINNING BULLHEAD OPS. CONTINUE TO CIRCULATE WHILE WAITING. CONDUCT PJSM ON BULLHEADING,POH WITH PLUG HOLDING BACKPRESSURE TO PREVENT SWABBING. OBTAIN AND RECORD SLOW PUMP RATES. 03:15 - 05:00 1.75 FISH N RREP WEXIT KCL ON LOCATION, LINE UP TRUCK TO RIG. CLOSE EDC. RIH FROM 9300'. TAG AT 9376' COIL TUBING DEPTH. SET DOWN 2.5K. PU 10',PUW 25K. COME ON LINE WITH PUMPS DOWN BACKSIDE,STAGE UP TO 4 BPM, ICP 1260 PSI, FCP 1180 WITH 110 BBLS AWAY. DOWN ON PUMPS. MONITOR WELL. NO PRESSURE. LOSSES ESTABLISHED AT 6 BPH. 05:00 - 09:00 4.00 FISH N RREP WEXIT LINE UP THROUGH CHOKE. POH AT 20 FPM, 1 BPM IN,.6 BPM OUT,HOLDING 250-260 PSI. INCREASE PULLING UP HOLE TO 50 FPM, 1.15 BPM IN,.63 BPM OUT,280 PSI BACK PRESSURE. 60 BBLS LOST DURING POH. CONDUCT AAR OF LATCHING INTO PLUG, BULLHEADING OPERATION WHILE POH. 09:00 - 10:00 1.00 FISH N RREP WEXIT PJSM. MONITOR WELL,15 MINUTES,WELL STABLE.FILL HOLE,3 BBLS TO FILL. - RESIDUAL GAS IN LUBRICATOR,FLUSH OUT SAME. -UD BHA, PLUG RETRIEVED, LAY DOWN SAME. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 12 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI: 500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 10:30 0.50 STWHIP P WEXIT M/U NIGHT CAP, PT AGAINST MASTER VALVE,NO VISIBLE LEAKS,OK. -FILL HOLE ACROSS THE TOP. DETERMINE _ LOSS RATE,12-15 BBLS/HR. 10:30 - 12:00 1.50 STWHIP P WEXIT P/U INJECTOR. PRESSURE TEST COIL CONNECTOR,250/4000 PSI, GOOD. -M/U BAKER DUAL CHECK VALVES,TEST, NO GOOD. -RETEST W/TEST PUMP,GOOD. -BREAK DOWN CHECKS, EXAMINE AND CLEAN GREASE OFF 0 RINGS. -M/U BAKER DUAL CHECK VALVES,TEST @ 250/3500 PSI,5 MIN EACH,GOOD. 12:00 - 13:30 1.50 STWHIP P WEXIT PJSM.M/U BAKER WHIPSTOCK BHA. -WHIPSTOCK SCRIBED TO THE HOT. -P/U INJECTOR,M/U TO WELL. -FILL PITS,TAKE PHYSICAL MEASUREMENT AS WELL AS PVT. 13:30 - 16:30 3.00 STWHIP P WEXIT RIH W/BAKER WHIPSTOCK ASSEMBLY ON 2" COIL. -PUMPING.8 BPM/350 PSI, RUNNING IN @ 70 FPM. 16:30 - 19:30 3.00 STWHIP P WEXIT LOGGING DOWN(GAMMA)F/11,140'@ 100'/ HR -LOG TO 11,393.7ft -TIE IN AND CORRECT DEPTH WITH-26.5' 19:30 - 19:50 0.33 STWHIP P WEXIT PUH TO 11,250'AND PERFORM CCL-LOG. OBSERVE GAS IN RETURNS ON LEL,ROUTE TO TIGER TANK. PU AND CLOSE EDC. 19:50 - 20:20 0.50 STWHIP P WEXIT SET WHIPSTOCK WITH 115DEG ROHS.TOWS AT 11,351 FT. 20:20 - 22:00 1.67 STWHIP P . WEXIT PICK UP HOLE TO 11,349',CIRCULATE BOTTOMS UP TO CIRCULATE GAS OUT OF WELL. CALL ENGINEER TO DISCUSS DISPLACING TO MUD. CALL OUT MUD FROM PLANT. 22:00 - 00:00 2.00 STWHIP P WEXIT CONTINUE PUMPING KCL TO CIRCULATE GAS OUT WELL.TOTAL VOLUME KCL CIRCULATED:700BBLS. 9/19/2011 00:00 - 03:10 3.17 STWHIP P WEXIT COMMENCE PUMPING BU WITH 8.6PPG QUIK-DRILL. STILL OBSERVE 120-60 ON LEL WHEN ATTEMPTING TO FLOW CHECK AND CIRCULATE ACROSS SHAKERS. LINE UP TO TIGER TANK. 03:10 - 04:00 0.83 STWHIP P WEXIT GET SLOW PUMP-RATES, FILL GAS BUSTER, CLOSE IN AGAINST CHOKE, HOLD 150-200PSI BACK PRESSURE AND FLOW THROUGH GAS BUSTER. RETURNS ARE GOOD BUT DENSITY OF MUD "IN"IS 8.5PPG,WHILST MUD"OUT"IS ONLY 7.37PPG TO 7.60PPG FOR 5OBBLS. PUMP AT 0.5BPM WITH 165PS1 WHP. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 13 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No : NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 05:00 1.00 STWHIP P WEXIT LINE UP WELL TO TIGER TANK AND FULLY OPEN UP.CLOSE IN PUMPS AND PERFORM FLOWCHECK-WELL APPEARS TO SHOW SMALLEST TRICKLE. ROUTE WELL TO MUD PITS-AGAIN OBSERVE MINUTE FLOW. START PUMPING AGAIN @ APPROX 2BPM, GAS PICKED UP BY LEL. IA=713(STEADILY INCREASING) 05:00 - 06:30 1.50 STWHIP P WEXIT PU WITH COIL TO ABOVE LINER TOP @ 10,793FT. CIRCULATE BOTTOMS UP FROM 10,780'. -CIRCULATING THRU GAS BUSTER...5 PPM H2S,TAKE RETURNS OUTSIDE. 06:30 - 08:30 2.00 STWHIP P WEXIT -SHUT IN CHOKE, HOLD 150-200 PSI BACK PRESSURE WHILE CIRCULATING. -TAKE RETURNS INSIDE, PUMPING 2.2 BPM/ 3400 PSI,8.6 PPG MUD. -GETTING BACK 2-2.1 BPM/WT CAME BACK TO 8.6 PPG AFTER PUMPING 25 BBLS. PUMPED REMAINDER OF BOTTOMS UP. (BTMS UP IS 205 BBLS) -SHUT DOWN PUMP,SHUT IN CHOKE W/190 PSI&OBSERVE. 08:30 - 12:30 4.00 STWHIP P WEXIT PRESSURE BLED TO 90 PSI.OPEN WELL& MONITOR. -WELL STABLE,CIRC BTMS UP @ 2.2 BPM/ 3300 PSI W/OPEN CHOKE. -PUMPED 150 BBLS AND OBSERVED DENSITY OUT SLOWLY DROPPING. -WENT BELOW 7 PPG AND THEN A SMALL GAS BLURP. -CLOSED CHOKE/HOLD 250 PSI BACK PRESSURE. -CONTINUE TO PUMP ANOTHER 25 BBLS UNTIL IT CLEANED UP. -8.6 PPG BACK,(GAS FREE), PUMPED 200 BBLS TOTAL. -MONITOR WELL,WELL STABLE.CHOKE OPEN. -CIRCULATE BOTTOMS UP,(205 BBLS),2.2 BPM/3150 PSI,W/CHOKE FULLY OPEN. -MOVED BHA DEPTH TO 10,750'W/ PUMPING. -8.6 PPG MUD BACK THROUGHOUT CIRCULATION. -NO GAS,SHUT DOWN,MONITOR WELL. BLED VA F 900 PSI TO 175,ALL FLUID. -WELL STABLE. 12:30 - 13:00 0.50 STWHIP P WEXIT PRESSURE TEST WHIPSTOCK PACKER @ 11,351'. -LINE UP AND PUMP DOWN COIL, PRESSURE TO 2350 PSI. -5.7 BBLS PUMPED,SHUT DOWN AND OBSERVE PRESSURE DROP TO 600 PSI IN 5 MINUTES. -TEST FAILED. (LINER LAP @ 10,793') -BLEED OFF ALL PRESSURE. 13:00 15:30 2.50 STWHIP P WEXIT POOH W/WHIPSTOCK RUNNING ASSEMBLY. FLOW CHECK WELL,WELL STABLE. Printed 10/17/2011 1.47:58PM North America -ALASKA- BP Page 14 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 8/19/1971 12.00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI: 500292010400 Active Datum:6: 04 8/19/1971 00.00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:30 1.00 STWHIP P WEXIT PJSM.BREAK OFF WELL,UD WHIPSTOCK BHA. -PJSM.M/U WINDOW MILLING BHA. BOP DRILL W/PICKING UP BHA. -AAR DONE ON ALL ACTIVITIES.WELL FLUID LEVEL STATIC THROUGHOUT. 16:30 - 19:45 3.25 STWHIP P WEXIT RIH W/WINDOW MILLING ASSEMBLY ON 2" COIL. LOG TIE-IN ON TRIP IN. BEGIN TO SEE ERRATIC READINGS ON MICROMOTION. LINE UP THROUGH GAS BUSTER. VARIATIONS IN DENSITY COMING BACK. CLOSE IN TO HOLD—150 PSI BACK PRESSURE. COMPLETE TIE-IN WITH-26' CORRECTION. 19:45 - 21:30 1.75 STWHIP P WEXIT DENSITY LEVELED OUT AT 8.6 PPG BOTH IN AND OUT AFTER 50 BBLS OF CIRCULATION. COMPLETE CIRCULATION OF BOTTOMS UP WITH 8.6 PPG IN AND OUT. 21:30 - 21:45 0.25 STWHIP P WEXIT CLOSE EDC. DRY TAG WHIPSTOCK AT 11,352'. PU WHILE LINING UP BACK TO SHAKERS. COME ON WITH PUMPS,ADJUST CHOKE TO HOLD 150 PSI. MW IN AND OUT 8.6 PPG,1.49 BPM IN,1.49 BPM OUT, PVT 302 BBLS, FREE SPIN 2800 PSI. 21:45 - 00:00 2.25 STWHIP P WEXIT TAG TOP OF WHIPSTOCK WITH PUMPS ON AT 11351.6'. BEGIN MILLING OPERATIONS PER BAKER REP. FREE SPIN 2800 PSI AT 1.5 BPM. MILL AT 1.5 BPM,2840 PSI,.7-2.0 K WOB. 9/20/2011 00:00 - 06:00 6.00 STWHIP P WEXIT MILL WINDOW PER WELL PLAN AND BAKER REP. -2460-2840 PSI,1.5 BPM,.2-2.0 K WOB -TIME MILL AT 1 FPH AT 11,357.2'. INDICATIONS INTO OPEN HOLE AT 11,358.2'. MILL INTO FORMATION AT 1 FPH. -GEO SAMPLES FROM BOTTOMS UP AT 11,362'REVEAL FORMATION HAS BEEN DRILLED INTO -MW IN AND OUT 8.6 PPG WITH 150 PSI OF BACK PRESSURE WHILE MILLING. LOST 3 BBLS TO WELL DURING MILLING OPERATIONS, NO GAS SEEN AT SURFACE. 06:00 - 08:00 2.00 STWHIP P WEXIT TOW @11,351', BOW @11,357' DRILLED TO 11,367'. -REAMED AND BACK REAMED WINDOW -DRY DRIFT WINDOW,SMOOTH,NO ISSUES. -PULL UP TO 11,335',OPEN EDC&FLOW CHECK,15 MINUTES,WELL STATIC. 08:00 - 09:30 1.50 STWHIP N DPRB 11,333.98 WEXIT PJSM.CIRCULATE BOTTOMS UP,CHOKE FULL OPEN. -2.6 BPM/3550 PSI. 146 BBLS PUMPED,OUT ./ DENSITY DROPPING. -151 PUMPED, LEL ALARM, ROUTE THRU GAS SEPARATOR. -HOLD 100-150 PSI BACK PRESSURE W/ CIRCULATING. -205 BBLS PUMPED,8.5-8.6 PPG COMING BACK, GAS FREE. Printed 10/17/2011 1:47:58PM • North America -ALASKA- BP Page 15 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 11:00 1.50 STWHIP N DPRB 11,333.98 WEXIT CONFER W/TOWN ENGINEER AND FIELD SUPERINTENDANT. -AGREE TO WEIGHT UP TO 8.9 PPG(HEAVY). -PJSM W/REGARD TO WEIGHTING UP. CHECK MSDS SHEET. -BEGIN WEIGHTING UP W/NaCL,CONTINUE CIRCULATING W/WEIGHTING UP. 11 00 - 12 20 1.33 STWHIP N DPRB 11,333.98 WEXIT ""HAYNES/SARBER CHANGE OUT. CIRCULATING AT 2.35/2.33/3578 PSL PVT 301 BBLS. IAP 556 PSI.OAP=12PSI.WP=106 PSI. IN DENSITY=9.0PPG,OUT DENSITY 8.59 PPG._129 BBLS IN,89 BBLS OUT THE EDC AND UP THE BACK SIDE. 12:20 - 14:00 1.67 STWHIP N DPRB 11,333.98 WEXIT GETTING 8.9 HEAVY OUT.HAVE 8.9 HEAVY GOING IN.OPEN CHOKE SLOWLY, REMAINING ON BOTTOM CIRCULATING BOTTOMS UP FOR 2ND TIME.2.37/2.36/3644 PSI.WHP=26PSI 14:00 - 14:10 0.17 STWHIP N DPRB 11,333.98 WEXIT TOTAL RETURNS ONCE KWF AT THE BIT= 225BBLS OF 9.0 PPG MUD(BU WAS 205BBLS). SHUT DOWN PUMPS AND FLOW CHECK THE WELL. NO GAS GUT MUD OBSERVED DURING THE LAST BOTTOMS UP WITH THE CHOKE OPEN. 14:10 - 16:30 2.33 STWHIP P WEXIT NO FLOW OBSERVED DURING FLOW CHECK. POH PUMPING AT FULL RATE THRU THE EDC AS WE POH WITH THE WINDOW MILLING BHA.FLOW CHECK WELL FOR 10 MIN ---- - STATIC. 16:30 - 17:00 0.50 STWHIP P WEXIT REMOVE INJECTOR HEAD AND LD WINDOW MILLING BHA.WINDOW MILL AT 2.72"WITH EXTREME WEAR TO FACE,STRING MILL IN GOOD SHAPE WITH 2.73"NO-GO. 17:00 - 18:30 1.50 DRILL P PROD1 PU DRILLING BHA.STAB INJECTOR ON WELL. PT QTS. 18:30 - 20:30 2.00 DRILL P PROD1 RIH AT 95 FPM.PUMPING.27 BPM.8.87 PPG ON IN MM.OPEN EDC. 20:30 - 21:00 0.50 DRILL P PROD1 GR TIE IN LOG DOWN AT 100FPH AT 11249'. CORRECTION-25.5' RA TAG AT 11357' 21:00 - 22:50 1.83 DRILL P PROD1 CIRCULATE BOTTOMS UP. LEL ALARM, ROUTE GAS THRU GAS SEPARATOR. 22:50 - 23:15 0.42 DRILL P PROD1 CLOSE EDC,FLOW CHECK WELL-NO FLOW. FLUSH OUT GAS BUSTER. 23:15 - 00:00 0.75 DRILL P PROD1 TAG UP AT 11367.7'AND START DRILLING. PUMPING 1.73 BPM AT 3130PSI,FS=2900 PSI. MM IN/OUT=8.98/9.03PPG PVT=309 BBLS,ROP=40FPH,WOB=.6K 9/21/2011 00:00 - 01:40 1.67 DRILL P PROD1 DRILL TO 11,500'.DH WOB.5K.PUMPING 1.70BPM AT 3115 PSI. FS=2900 PSI.MM IN/OUT 9.01/9.03 PPG. 01:40 - 02:00 0.33 DRILL P PROD1 WIPER TRIP FROM 11,500'UP TO 11,375'. 02:00 - 03:30 1.50 DRILL P PROD1 DRILLING AT 11,553'.DH WOB 2.1K.PUMPING 1.72,BPM AT 3200 PSI.FS=2900 PSI.MM IN/OUT 9.01/9.03 PPG.PVT=299BBL. ECD=9.56 Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 16 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6 : 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 05:40 2.17 DRILL P PROD1 DRILL AHEAD FROM 11,554' PUMP AT 1.92 BPM WITH 3,274 PSI. WOB 1.6 ROP OF 37' MUD WEIGHT IN AT 8.99 PPG AND OUT AT 9.02 PPG. PVT OF 281 BBLS AND ECD OF 9.58 PPG, IA AT 458 PSI,OA AT 2 PSI. 05:40 - 05:50 0.17 DRILL P PROD1 POOH FOR BIT.ROP WENT TO ZERO AND WILL NOT DRILL OFF. 05:50 - 06:00 0.17 DRILL P PROD1 FLOW CHECK AT 11331'-NO FLOW OPEN EDC PVT=299BBLS 06:00 - 08:00 2.00 DRILL P PROD1 POH 85FPM PUMPING 2.33 BPM AT 3519 PSI. MM IN/OUT 9.01/9.02 PPG. IA/OA 547/2 PSI.WHP=44P51. FLOW CHECK WELL.STATSIC. 08:00 - 09:00 1.00 DRILL P PROD1 STAND BACK INJECTOR. L/D BHA.ADJUST MOTOR FROM 1.1+TO 1+ DEGREE. CHANGE BIT TO RAPTER SERIAL NUMBER A145575. THE OLD BIT SERIAL NUMBER 131933 IS RATED AT A 7-3-RO-A-X-I-BT-PR 09:00 - 12:00 3.00 DRILL P PROD1 M/U INJECTOR AND TEST QUICK TEST SUB TO 3500 PSI-GOOD. RIH WITH BHA#7 TO WINDOW. 91 FPM PUMPING.37 BPM AT 755 PSI MUD WEIGHT IN AND OUT IS 8.91 IN AND 9.03 OUT. IA IS 375 PSI,OA IS 2 PSI WELL HEAD IS 70 PSI. 12:00 - 14:30 2.50 DRILL P PROD1 SCHLUMBERGER INSPECT TRACTION MOTOR. OPEN EDC ✓ PUMP BOTTOMS UP AT 2.5 BPM WITH 3472 PSI. AT 140.5 BBLS OUT THE LEL SENSOR ALARMED AT 14%AND THE RETURNS WHERE LINED UP 1 HROUGH MGS. THE OUT DENSITY DROPPED TO 8.7+PPG AT 186 BBLS OUT THE DENSITY RETURNED TO 9.01 PPG AND THE MUD WAS THEN DIVERTED BACK TO SHAKERS WITH NO LEL READINGS.THE REST OF THE BOTTOMS UP WAS PUMPED TO 205 BBLS TOTAL AND PUMPS SHUT DOWN. MONITOR WELL FOR 30 MIN.-STATIC 14:30 - 15:45 1.25 DRILL P PROD1 DISCUSS WITH TOWN ODE ON PLAN FORWARD SINCE THERE WAS GAS CUT MUD IN BOTTOMS UP. MAINTAIN GOOD WELL CONTROL DRILLS AND MONITOR WELL AS NEEDED,CONTINUE TO DRILL AHEAD. CLOSE EDC. RIH AND TIE IN-25', LOG FROM 11,200'TO 11,246'CORRECTED TO 11,213'. RIH TO 11,550'. OBTAIN SLOW PUMP RATES. TAG UP AT 11,554'. Printed 10/17/2011 1:47:58PM .lorth America -ALASKA- BP Page 17 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site:PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:45 - 18:15 2.50 DRILL P PROD1 DRILL FROM 11,554'TO 11,700'. FS @ 1.78 BPM 2974 PSI ROP=36 FPH WOB=1.7K 18:15 - 18:40 0.42 DRILL P PROD1 WIPER TRIP FROM 11,700'UP TO 11,326' PU WT 33K PUMPING 1.75BPM@3120PS1 PVT 274 BBL 18:40 - 18:50 0.17 DRILL P PROD1 FLUSH GAS BUSTER WITH FRESH WATER. 18:50 - 19:00 0.17 DRILL P PROD1 RIH TO BOTTOM. 19:00 - 21:30 2.50 DRILL P PROD1 DRILL FROM 11,700'TO 11,850'. FS @ 1.60 BPM 2850 PSI ROP=60 FPH WOB=2.9K PVT 267 BBLS - 21:30 - 22:30 1.00 DRILL P PROD1 WIPER TRIP FROM 11,850' PU WT 33K PUMPING 1.60 BPM @2980 PSI PVT 267 BBL 22:30 - 00:00 1.50 DRILL P PROD1 DRILL FROM 11,850'TO 11,868'. FS @ 1.60 BPM 2980 PSI ROP=10 FPH WOB=2.0K 9/22/2011 00:00 - 03:45 3.75 DRILL P PROD1 DRILL FROM 11,868'TO 12,000'. FS @ 1.74 BPM 3100 PSI ROP=40 FPH WOB=2.0K 03:45 - 04:15 0.50 DRILL P PROD1 WIPER TRIP FROM 12,000'UP TO 11,186' 04:15 - 06:00 1.75 DRILL P PROD1 GR TIE IN FROM 11,186' TIE IN OF-30' P/U AND RECHECK TIE IN-SAME. 06:00 - 06:30 0.50 DRILL P PROD1 RIH TO BOTTOM AT 11,971'AND TAG UP'. OBTAIN SPRS ON BOTH PUMPS. 06:30 - 07:15 0.75 DRILL P PROD1 DRILL AHEAD FROM 11,971'TO 11,987' HOLD KICK WHILE DRILLING DRILL. DRILLER P/U OFF BOTTOM AND TIGHTENED THE PACK OFFS. RIG TEAM RESPONDED WELL AND LINED UP ALL EQUIPMENT WHEN I ADDED THE COMPLEXITY OF THE PACK OFFS LEAKED FORCING THE CLOSURE OF THE BAG AND ONCE BAG CLOSED I ANNOUNCED THAT THE PUMPS ON KUMMY CONTINUED TO PUMP AND PRESSURE NEVER RECOVERED WHEN THE MOTOR MAN NEUTRALIZED THE HANDLE ON THE ANNULAR PREVENTER AND CLOSED THE UPPER COMBIS.THE COMPLEX DRILL WENT WELL AND ALL UNDERSTOOD THE SITUATION,THIS SIMULATION WAS TABLE TOPPED BY MYSELF AND THIS CREW 3 WEEKS AGO AND ALL REMEMBER THE ACTIONS NEEDED. 07:15 - 10:30 3.25 DRILL P PROD1 DRILL AHEAD FROM 11,987'TO 12,150' ROP OF 47.2 FT/HR,WOB OF 2.46K, ECD OF 9.75. IA OF 670PSI,OA OF 1 PSI PUMPS AT 1.85 BPM WITH 3197 PSI,MW IN OF 9.03 PPG AND OUT OF 9.05 PPG PIT VOLUME OF 245 BBLS,LOSS RATE OF 1 BPH. Printed 10/17/2011 1.47:58PM North America -ALASKA- BP Page 18 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 13:30 3.00 DRILL P PROD1 POH TO WINDOW AT 11,300' OPEN EDC, INCREASE PUMP RATE TO 2.56 BPM AT 3735 PSI. PUMP 20 BBLS HIGH VIS SWEEP TO CLEAN 5-1/2". GR TIE IN AT 11,380'SHOWED A CORRECTION OF+1'. HI-VIS SWEEP AT 88K LSRV SHOWED NO INCREASE IN CUTTINGS. 13:30 - 15:30 2.00 DRILL P PROD1 DRILL AHEAD FROM 12,150'TO 12,275' ROP 60 FT/HR,WOB OF 3.04K, ECD OF 9.78 PPG IA OF 657 PSI, OA OF 0 PSI PUMPS AT 1.81 BPM WITH 3549 PSI, MW IN OF 9.05,MW OUT OF 9.06 PPG PIT VOLUME OF 246 BBLS WITH LOSS RATE OF—1BPH. P/U AND WIPE BHA LENGTH.RIH AND NOTICED A 5'DISCREPANCY. DECIDE TO RUN WIPER TRIP EARLY AND ADJUST COUNTER FRICTION WHEEL PRIOR TO CROSSING FAULT. 15:30 - 17:22 1.87 DRILL P PROD1 POH WIPING FROM 12,275'TO 11,210' TIGHTEN COUNTER FRICTION WHEEL CHAIN. GR TIE IN TO CORRECT DEPTH-37.5' 17:22 - 18:45 1.38 DRILL N SFAL 12,261.00 PROD1 WORK ON COUNTER WHEEL TO FIX DEPTH TRACKING ISSUES. RIH TAG BOTTOM-13.2'OFF ORIGINAL BOTTOM. 18:45 - 20:00 1.25 DRILL N SFAL 12,261.00 PROD1 LOG GR TIE IN AT SAG RIVER.LOG DOWN AT 100FPH FROM 11,180'CORRECTION+1' 20:00 - 22:00 2.00 DRILL N SFAL 12,261.00 PROD1 MADD PASS TO BOTTOM AT 500FPH FROM 11,360'TO TD. 22:00 - 00:00 2.00 DRILL N SFAL 12,261.00 PROD1 RESURVEY WELL FROM 11,730'TO 12,261'. 9/23/2011 00:00 - 02:15 2.25 DRILL N SFAL 12,261.00 PROD1 RE-PLAN WELL WITH CORRECT SURVEYS. BRING ON 58 BBL MUD TO TOP OFF PITS. 02:15 - 05:10 2.92 DRILL P PROD1 DRILL AHEAD FROM 12,261' ROP 100 FPH,WOB 1.6K, ECD OF 9.9 PPG IA OF 615 PSI,OA OF O PSI PUMPS AT 1.6 BPM WITH 3300 PSI,FS=3000 PSI MW IN OF 9.05,MW OUT OF 9.06 PPG PVT=276BBL,LOSING—1 BPH 05:10 - 06:00 0.83 DRILL P PROD1 WIPER TRIP TO WINDOW. GR TIE IN AT TSGR. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 19 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 06:30 0.50 DRILL P PROD1 HOLD UNANNOUNCED COMPLEX WELL CONTROL DRILL DURING CREW CHANGE WITH MAN DOWN DRILL(ON COMING CREWS MOTOR MAN WAS MAN DOWN) DRILLER TIGHTENED PACK OFFS,WHEN ANNOUNCED THE PACK OFFS WHERE NOT HOLDING HE SHUT DOWN PUMPS CLOSED BAG AND HCR.THE OUT GOING MOTOR MAN REPORTED TO KUMMEY.THE MAN DOWN WAS ANNOUNCED.THERE WAS SOME CONFUSION DUE TO LACK OF COMMUNICATION AND CREW CHANGE, WHICH WAS COVERED IN AAR.ALL IN ALL IT WAS A GOOD DRILL. LESSONS LEARNED WAS THAT CREWS WHERE STEPPING ON EACH OTHER OVER THE RADIOS SO WAS DISCUSSED THAT THE MINIMAL RADIO USAGE WAS NEEDED DURING INCIDENTS AND MORE RADIOS WHERE TO BE ISSUED. DURING AAR THE CREW MENTIONED HOW THEY LIKED THE COMPLEX DRILL BECAUSE OF THEIR LEARNING'S FROM THE DRILLS AND THAT FOR THE CREW ON TOUR HAD NOT HAD ONE UNTIL THIS HITCH. 06:30 - 07:30 1.00 DRILL P PROD1 TIE IN+2'CORRECTION RIH AND TAG AT 12,387' 07:30 - 10:45 3.25 DRILL P PROD1 DRILL AHEAD FROM 12,387'TO 12,529' ROP 26 FPH,WOB 3.41K, ECD OF 9.9 PPG IA OF 615 PSI, OA OF 0 PSI PUMPS AT 1.7 BPM WITH 3226 PSI, FS=3168 PSI MW IN OF 9.05, MW OUT OF 9.09 PPG PVT=269BBL, LOSING—1 BPH >/ AFTER—140 BBLS SINCE PUMPS WHERE SHUT DOWN(FOR ABOVE DRILL)THE LEL ALARM WENT OFF AT 14%LEL.THE MUD WAS DIVERTED FOR 12 BBLS WHEN DENSITY RETURNED AND MUD WAS DIVERTED BACK TO PITS.THE WELL WAS MONITORED AND STATIC. DRILL TO 12,529'WHEN BIT STOPPED DRILLING.P/U AND WIPED 300'AND ATTEMPT TO DRILL AHEAD WITH OUT SUCCESS. 10:45 - 11:45 1.00 DRILL P PROD1 POH TO CHANGE BITS. GR TIE IN AND RIH 20'TO CHECK TOOLS. CORRECTED BY+2', RESISTIVITY TOOL FAILED. 11:45 - 15:00 3.25 DRILL P PROD1 POH TO WINDOW. OPEN EDC AND INCREASE PUMP RATE TO JET 5-1/2"TUBING ON TRIP OUT OF HOLE. PUMP AT 2.6 BPM AND 3698 PSI. MW IN OF 9.06 PPG, MW OUT OF 9.13 PPG PVT 244 BBLS, IA OF 682 PSI, OA OF 0 PSI, TUBING SPEED OF 85 FPM. MONITOR WELL PRIOR TO BHA-WELL STATIC. Printed 10/17/2011 1:47:58PM • North America -ALASKA- BP Page 20 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum_:6:04 8/19/1971 00:00©64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 15:30 0.50 DRILL P PROD1 WHILE UD BHA AN UNANNOUNCED WELL CONTROL DRILL WAS HELD. THE INJECTOR HEAD WAS MOVED OUT OF THE WAY AND THE BHA WAS PULLED FROM THE WELL,BLINDS WHERE SHUT WITHIN 3 MINUTES. DURING THE AAR THE CREW DISCUSSED THE STANDING ORDERS OF CLOSING THE HCR OR JUST CLOSE TO THE CLOSED CHOKE. I MENTIONED THAT IT WAS TO FOLLOW THE STANDING ORDERS AS THE CHOKE MAY NOT BE RELIABLE THE ONCE WELL SECURE AND THE NOTIFICATIONS TO THE WSL AND TOOLPUSHER WHERE MADE THE HCR COULD BE EQUALIZED TO THE CHOKE TO GET PRESSURE READINGS IN A MORE SECURE MANNER AND NOT IN A HURRY WITH A POSSIBLE LEAKING CHOKE. THEY ALL AGREED IT WAS THE RIGHT THING TO DO.WE ALSO CAPTURED THAT IT WAS NOT ANNOUNCED OVER THE RADIO SO THE SCS WAS NOT IN THE LOOP.THIS WAS ANOTHER GOOD DRILL WITH LESSONS LEARNED. OPEN WELL AND MONITOR-STATIC 15:30 - 17:15 1.75"" DRILL P PROD1 "UD FAILED RESISTIVITY TOOL/BHA. P/U NEW BHA AND BIT SERIAL NUMBER 7017687 OLD BIT SERIAL NUMBER A145575 GRADED AT 6-2-RO-N-X-I-BT-PR. M/U INJECTOR HEAD AND TEST TO 3500 PSI. GOOD TEST. 17:15 - 20:00 2.75 DRILL P PROD1 RIH TO WINDOW. 20:00 - 22:00 2.00 DRILL P PROD1 OPEN EDC. LOG TSGR GR TIE. CORRECTION-21'. CIRCULATE BU THRI GAS BUSTER. NO GAS NOTICED. 22:00 - 23:40 1.67 DRILL P PROD1 LOG MAD PASS 500 FPH FROM 11,700'TO 12,527'. 23:40 - 00:00 0.33 DRILL P PROD1 GET SPR'S AND TAG BOTTOM. DRILL FROM 12,527'TO 12,538'. ROP 100 FPH,WOB 1.7K, ECD OF 9.9 PPG IA OF 750 PSI, OA OF 0 PSI PUMPS AT 1.54 BPM WITH 3220 PSI, FS= 3000 PSI MW IN OF 9.05,MW OUT OF 9.07 PPG 9/24/2011 00:00 - 02:15 2.25 DRILL P PROD1 DRILL FROM 12,538'TO 12,686' ROP 66 FPH,WOB 2K, ECD OF 9.9 PPG IA OF 615 PSI,OA OF 0 PSI PUMPS AT 1.54 BPM WITH 3600 PSI, FS= 3000 PSI MW IN OF 9.05,MW OUT OF 9.06 PPG PVT=281 BBL 02:15 - 02:35 0.33 DRILL P PROD1 200'WIPER TRIP. 02:35 - 02:45 0.17 DRILL P PROD1 DRILL FROM 12,686'TO 12,702' ROP 120 FPH,WOB 1.6K, ECD OF 10.0 PPG IA OF 723 PSI,OA OF 0 PSI PUMPS AT 1.54 BPM WITH 3300 PSI, FS= 3000 PSI MW IN OF 9.05, MW OUT OF 9.08 PPG PVT=28OBBL Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 21 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA _ UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:45 - 03:45 1.00 DRILL P PROD1 WIPER TRIP UP TO 11,375'. 03:45 - 04:00 0.25 DRILL P PROD1 FLUSH NORDIC GAS BUSTER 04:00 - 10:00 6.00 DRILL P PROD1 DRILL FROM 12,702' ROP 50 FPH,WOB 2.8K, ECD OF 10.0 PPG IA OF 763 PSI, OA OF 0 PSI PUMPS AT 1.65 BPM WITH 3370 PSI, FS= 3050 PSI MW IN OF 9.05,MW OUT OF 9.09 PPG PVT=280BBL DRILLING ROP SLOWED DOWN,WORKING PIPE 300'THEN BACK MAKING LITTLE HEAD WAY WITH GOOD WEIGHT ON BIT AT 3-4K. ROP DROPPED TO ZERO AT 12,786' CIRCULATED UP SAMPLE SHOWING CHERT. DECISION MADE TO POOH FOR BIT. 10:00 - 13:45 3.75 DRILL P PROD1 POOH FOR BIT. MONITOR WELL PRIOR TO PULLING BHA- STATIC 13:45 - 15:00 1.25 DRILL P PROD1 RACK BACK INJECTOR HEAD. POH WITH BHA.OLD BIT#7017687 RATED AT 8-4-RO-N-X-I-BT-PR M/U INJECTOR HEAD. JET BOP STACK. RACK BACK INJECTOR HEAD. 15:00 - 18:00 3.00 BOPSUR P PROD1 WFEKLY FUNCTION TEST OF BOPE. _ -FUNTION TEST FROM BOTH REMOTE PANELS.GOOD TEST. -M/U NIGHT CAP AND TEST MASTER AND SWAB-FAILED,GREASE MASTER AND SWAB -RETEST 18:00 - 20:00 2.00 BOPSUR P PROD1 PJSM,CHANGE AND TEST BAKER CHECKS. 20:00 - 21:00 1.00 DRILL P PROD1 M/U BHA#9 WITH NEW BIT SERIAL#A146936- HYC,4X 10 JETS WITH 0.307 TFA,TYPE- SRR3408M-B7-Z. RIH TO 67.83' M/U INJECTOR HEAD AND TEST TO 3500 PSI- GOOD TEST. 21:00 - 22:00 1.00 DRILL P PROD1 TROUBLE WORKING BHA THRU STACK. POP INJECTOR OFF WELL AND INSPECT COIL. STAB INJECTOR BACK ON WELL AND RE TEST QTS. 22:00 - 00:00 2.00 DRILL P PROD1 RIH TO 11,200'. 9/25/2011 00:00 - 00:30 0.50 DRILL P PROD1 LOG GR TIE ACROSS TSGR.CORRECTION -20.5 BU A LITTLE GAS LEL 10 SWAPPED TO GAS BUSTER FOR 10 MINUTES. 00:30 - 02:00 1.50 DRILL P PROD1 RIH AND TAG UP AT 12,780' 02:00 - 04:15 2.25 DRILL P PROD1 DRILL FROM 12,780' w ROP 60 FPH,WOB 2.OK, ECD OF 10.0 PPG IA OF 647 PSI, OA OF 0 PSI PUMPS AT 1.60 BPM WITH 3260 PSI, FS= 3100 PSI MW IN OF 9.05, MW OUT OF 9.08 PPG PVT=290BBL 04:15 - 06:00 1.75 DRILL P PROD1 WIPER TRIP FROM 12,948'TO WINDOW. FLUSH GAS BUSTER. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 22 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 09:00 3.00 DRILL P PROD1 DRILL FROM 12,948 TO 13,100' ROP 88 FPH,WOB 2.35K,ECD OF 10.1 PPG IA OF701 PSI,OA OF 0 PSI PUMPS AT 1.76 BPM WITH 3362 PSI, MW IN OF 9.06,MW OUT OF 9.13 PPG PVT=284BBL 09:00 - 10:00 1.00 DRILL P PROD1 WIPER TRIP FROM 13,100'TO WINDOW. 10:00 - 10:45 0.75 DRILL P PROD1 HOLD RIG EVAC DRILL ALL EMPLOYEES ACCOUNTED FOR.HOLD AAR DISCUSSED THAT THE REASON FOR EVAC WAS AN OUT OF CONTROL FIRE AND ALL EVAC TO SAT.CAMP WHICH IS SET UP NEXT TO A FUEL TANK AND PROBABLY SHOULD NOT AN EVAC POINT AS IT IS NEAR THE RIG.THE SIGN IN SHACK WILL BE MOVED TO BE LOCATED 180 DEGREE OUT FROM THE RIG AND BECOME THE SECURE AREA AND THE ROAD WILL BE BLOCKED BEHIND THE RIG TO ENSURE TRAFFIC IS ROUTED BE THE SIGN IN SHACK. 10:45 - 12:30 1.75 DRILL P PROD1 TIE IN AT+5' RIH AND TAG AT 13,099' 12:30 - 17:30 5.00 DRILL P PROD1 DRILL AHEAD FROM 13,099'TO 13,176' ROP 88 FPH,WOB 1.35K, ECD OF 10.25 PPG IA OF 730 PSI,OA OF 0 PSI PUMPS AT 1.76 BPM WITH 3158 PSI, MW IN OF 9.06,MW OUT OF 9.13 PPG PVT=272 BBL DRILLING ROP SLOWED TO 32. LSRV ON OLD MUD AT 26K PRIOR TO DISPLACEMENT. TRUCKS ON LOCATION TO DISPLACE TO NEW MUD. DRILLING AT 13,150' ROP 10 FPH,WOB 2.9 K,ECD OF 9.89 PPG IA OF 746 PSI,OA OF 0 PSI PUMPS AT 1.72 BPM WITH 2582 PSI, MW IN OF 8.91,MW OUT OF 9.11 PPG MUD PARTIALLY DISPLACED.LSRV OFF TRUCK 32K. MUD FULLY DISPLACED AT 13,170'AND 17:00 HRS. ROP AT 15 FPH WOB 2.79 K,ECD OF 9.70 PPG IA OF 752 PSI,OA OF 0 PSI PUMPS AT 1.72 BPM WITH 2465 PSI, MW IN OF 8.89,MW OUT OF 9.00 PPG 17:30 - 21:00 3.50 DRILL P PROD1 POH FOR BIT. FLOW CHECK AT WINDOW-NO FLOW. OPEN EDC AT WINDOW AND POOH JETTING 5-1/2"TUBING. FLOW CHECK AT SURFACE-NO FLOW. CLOSE EDC. 21:00 - 21:30 0.50 DRILL P PROD1 PJSM TO LD DRILLING BHA#9 AND PU DRILLING BHA#10. 21:30 - 22:30 1.00 DRILL P PROD1 LD DRILLING BHA#9 AND PU DRILLING BHA#10. 22:30 - 23:00 0.50 DRILL P PROD1 STAB INJECTOR ON WELL AND PT QTS TO 3500 PSI. 23:00 - 00:00 1.00 DRILL P PROD1 RIH TO 11,200'. PUMPING.35 BPM AT 750 PSI. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 23 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/26/2011 00:00 - 01:10 1.17 DRILL P PROD1 RIH TO 11,200'. PUMPING.35 BPM AT 750 PSI. 01:10 - 02:00 0.83 DRILL P PROD1 OPEN EDC AND CIRCULATE BU 2.36 BPM AT 3518 PSI. BU 200 BBLS NO GAS TO SURFACE. GR LOG TIE IN AT TOP OF SAG RIVER. CORRECTION-24'. 02:00 - 03:30 1.50 DRILL P PROD1 CLOSE EDC. RIH TO 13,176'PUMPING 1.6 BPM AT 2300PS1. 03:30 - 07:00 3.50 DRILL P PROD1 DRILL FROM 13,176'TO 13,300' ROP 39 FPI-I,WOB 1.5K,ECD OF 9.6 PPG IA OF 739 PSI,OA OF 0 PSI PUMPS AT 1.67 BPM WITH 2681 PSI, FS= 2500 PSI MW IN OF 8.91,MW OUT OF 8.95 PPG PVT=291 BBL 07:00 - 09:30 2.50 DRILL P PROD1 ,SHORT TIP TO WINDOW. 09:30 - 12:30 3.00 DRILL P PROD1 _DRILL AHEAD FROM 13,300'TO 13,450' ROP 67 FPH,WOB 1.06K, ECD OF 9.86PPG IA OF 795 PSI,OA OF 0 PSI PUMPS AT 1.7 BPM WITH 2600 PSI,FS=2542 PSt- MW IN OF 8.91,MW OUT OF 8.95 PPG PVT=274BBL LOSS RATE-2 BPH. 12:30 - 15:30 3.00 DRILL P PROD1 SHORT TRIP TO WINDOW TIE IN AT+6-1/2' 15:30 - 19:30 4.00 DRILL P PROD1 DRILL AHEAD FROM 13,450'TO 13,586' ROP 35 FPH,WOB 1.6 K,ECD OF 9.81 PPG IA OF 807 PSI,OA OF 4 PSI PUMPS AT 1.52 BPM WITH 2695 PSI, FS= 2322 PSI MM IN/OUT =8.92PPG/8.98 PPG PVT=291 BBL LOSS RATE-2 BPH. '19:30 - 21:30 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 13,586' PULLING 28 FPM, PUMPING 1.51 BPM AT 2465 PSI. MM IN/OUT=2.92PPG/9.01 PPG. ECD=9.58 PVT=270 BBL 21:30 - 23:45 2.25 DRILL P PROD1 DRILL AHEAD FROM 13,586'TO 13,644' ROP 20 FPH,WOB 2 K, ECD OF 9.80 PPG IA OF 620 PSI,OA OF 0 PSI PUMPS AT 1.6 BPM WITH 3036 PSI,FS=2700 PSI MM IN/OUT =8.95PPG/8.98 PPG PVT=291 BBL 23:45 - 00:00 0.25 DRILL P PROD1 BHA WIPER PU WT 38K, PUMPING 1.47 BPM AT 2550 PSI. 9/27/2011 00:00 - 02:15 2.25 DRILL P PROD1 DRILL AHEAD FROM 13,644'TO 13,668' ROP 10 FPH,WOB 2.2 K, ECD OF 9.80 PPG IA OF 625 PSI,OA OF 0 PSI PUMPS AT 1.35 BPM WITH 2445 PSI,FS= 2300 PSI MM IN/OUT =8.97PPG/8.99 PPG PVT=291 BBL LOADED 157 JTS OF 2-3/8"LINER IN PIPE SHED.DRIFTED AND TALLIED. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP " Page 24 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI: 500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:15 - 07:00 4.75 DRILL P PROD1 ROP WENT TO ZERO. POOH FOR NEW BIT AND TO PU AGITATOR. STOP AT WINDOW FOR FLOW CHECK-NO FLOW. PULLING 76 FPM. OPEN EDC. PUMPING 2.4 BPM AT 3550 PSI 07:00 - 07:45 0.75 DRILL P PROD1 CLOSE EDC. FLOW CHECK AT SURFACE-NO FLOW. BREAK INJECTOR OFF AND STAND BACK. L/D BHA. BIT GRADED AT 6-2-RO-N-X-I-BT-PR 07:45 - 11:00 3.25 DRILL P PROD1 CHANGE PACK OFFS R/U AND M/U INJECTOR TEST PACK OFF TO 250 PSI LOW AND 3500 PSI HIGH-GOOD TEST. PUMP SLACK BACK TO CUT COIL. CUT 120'OF COIL. PUMP SLACK FORWARD. 11:00 - 12:00 1.00 DRILL P PROD1 INSTALL COIL CONNECTOR. PULL TEST TO 35K.PT TO 3,500 PSI. PUMP E-LINE FORWARD.REREAD E-LINE. TOP OFF PITS WITH 60 ADDITIONAL BBLS NEW MUD. 12:00 - 14:00 2.00 DRILL P PROD1 PJSM AND PU DRILLING BHA#11 WITH AGITATOR AND NEW BIT. 14:00 - 14:30 0.50 DRILL P PROD1 PT QTS TO 3500 PSI. 14:30 - 16:45 2.25 DRILL P PROD1 RIH 96FPM.PUMPING 1.8 BPM AT 2531 PSI. MM IN/OUT 8.92 PPG/9.01 PPG PVT 262,IA/OA=138 PSV 0 PSI 16:45 - 17:00 0.25 DRILL P PROD1 LOG GR TIE IN AT 11220'.CORRECTION-22.5'. 17:00 - 19:20 2.33 DRILL P PROD1 CIRCULATE BOTTOMS UP.CLOSE EDC.RIH TO 13,667'. 19:20 - 21:30 2.17 DRILL P PROD1 DRILL AHEAD FROM 13,667'TO 13,800' ROP 90 FPH,WOB 1.7K,ECD OF 9.90 PPG IA OF 605 PSI,OA OF 0 PSI PUMPS AT 1.5 BPM WITH 3615 PSI,FS=3390 PSI MM IN/OUT =8.97PPG/9.02 PPG PVT=261 BBL 21:30 - 00:00 2.50 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 13,800'. 9/28/2011 00:00 - 02:45 2.75 DRILL P PROD1 DRILL AHEAD FROM 13,800'TO 13,950' ROP 66 FPH,WOB 1.3K, ECD OF 9.98 PPG IA OF 611 PSI,OA OF 0 PSI PUMPS AT 1.56 BPM WITH 3560 PSI, FS= 3400 PSI MM IN/OUT =8.99PPG/9.02 PPG PVT=264BBL 02:45 - 04:50 2.08 DRILL P PROD1 WIPER TO WINDOW. 04:50 - 05:00 0.17 DRILL P PROD1 LOG GR TIE IN. CORRECTION+7'. 05:00 - 05:45 0.75 DRILL P PROD1 RIH TO BOTTOM. 05:45 - 06:00 0.25 DRILL P PROD1 ON BOTTOM DRILLING 13,950'. Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 25 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 10:00 4.00 DRILL P PROD1 DRILL AHEAD FROM 13,980' ROP 45 FPH,WOB 1.8K, ECD OF 10.05 PPG IA=600 PSI,OA=0 PSI PUMPS AT 1.53 BPM WITH 3680 PSI,FS= 3200 PSI MM IN/OUT =8.99 PPG/9.02 PPG PVT=262BBL LOSSES ARE—2-3 BPH WHILE DRILLING 10:00 - 11:30 1.50 DRILL P PROD1 DRILLING ROP HAS DECREASED SINCE CHANGE OUT AND HAVE BEEN DRILLING IN A 20-30 API SAND FOR AWHILE WITH 30-40% CHERT.MUD PROPERTIES LOOK GOOD WITH ONLY 0.8%SOLIDS.LOOKS LIKE THE BIT IS WORN,CALLED ODE AND DISCUSSED EVERYTHING ABOVE AND WE ARE GOING TO POOH FOR A HYCALOG RAZOR EDGE WITH THE NEW Z CUTTERS AND TEST BOPE PVT=243 BBLS LOU GRIMALDI WITH THE AOGCC HAS WAIVED WITNESSING THE TEST 11:30 - 13:50 2.33 DRILL P PROD1 OPEN EDC AND POOH PUMPING AT MAX RATE PIT VOLUME=226 BBLS 13:50 - 14:10 0.33 DRILL P PROD1 STOP AT 200'AND FLOW CHECK WELL 13:55 PJSM TO PULL BHA 14:10 - 14:35 0.42 DRILL P PROD1 VERIFY NO FLOW AT SHAKER AND PU INJECTOR 14:35 - 15:15 0.67 DRILL P PROD1 BLOW DOWN BHA AND LD 15:15 - 17:00 1.75 DRILL P PROD1 BHA OOH BIT IS RUNG OUT BIT GRADED AT 8-6-RO-N-X-I-BT-PR INSTALL NIGHT CAP 17:00 - 18:00 1.00 DRILL P PROD1 PRESSURE TEST NIGHT CAP AIR TEST AGITATOR GOOD INDEPENDENT TESTS ON BOTH MASTER AND SWAB VALVES 18:00 - 22:30 4.50 DRILL P PROD1 BLOW DOWN KILL LINE W/AIR,LOTO KOOMEY,SUCK OUT BOP,INSPECT TOT RAMS,LUBRICATE CHOKE VAIVES AND MUD CROSS. FUNCTION TEST BOP AND HCR FROM OP'S CAB AND RIG FLOOR CONTROLS. FLUID PACK BOP'S AND CHOKE. PJSM AND INJECTOR CHAIN AND GRIPPER BLOCK INSPECTION. 22:30 - 00:00 1.50 DRILL P PROD1 TFST BOP'S �� GREASE REEL COMPONENTS,LEVEL WIND AND GOOSE NECK ROLLERS. 9/29/2011 00:00 - 05:00 5.00 DRILL P PROD1 CONTINUE BOPE TEST. 05:00 - 09:30 4.50 DRILL P PROD1 BOP TEST COMPLETED INSTALL NIGHT CAP 09:30 - 10:00 0.50 DRILL P PROD1 TEST NIGHT CAP BEFORE OPENING UP TO WELL 10:00 - 10:20 0.33 DRILL P PROD1 GOOD TEST,PJSM TO OPEN UP TO WELL AND MU DRILLING BHA 10:20 - 10:50 0.50 DRILL P PROD1 SWAB AND MASTER OPEN AND WELL IS ON A VAC ONLINE WITH CHARGE PUMP TO FILL HOLE. PVT=191 BBLS Printed 10/17/2011 1:47:58PM North America -ALASKA- BP Page 26 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time. 8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI: 500292010400 Active Datum:6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:50 - 11:20 0.50 DRILL P PROD1 WELL TOOK 10 BBLS TO FILL,COME ONLINE WITH PUMP TO GET STABILIZED DENSITY THEN SHUT DOWN AND MONITOR FOR A FEW MINUTES BEFORE PULLING NIGHT CAP 11:20 - 12:00 0.67 DRILL P PROD1 WELL IS FULL AND FLUID LEVEL IS STABLE SIMULATE WELL KICK DRILL WHILE FILLING THE HOLE AND MOITORING,CREW RESPONDED VERY WELL TO THEIR POSITIONS AND WERE READY TO SHUT THE WELL IN IF NEEDED. DRILL WAS COMPLETED WITH AN AAR MU BHA 12:00 - 13:40 1.67 DRILL P PROD1 PT QTS, OPEN EDC AND RIH STARTED PUMPING TO ESABLISH GOOD RETURNS BEFORE RIH AT 1.5 BPM AND 2500 PSI.AFTER—12 BBLS THE PRESSURE STARTED RAMPING UP AND WE HAD TO REDUCE OUR RATE TO KEEP FROM TRIPPING THE PUMPS.SWAPPED TO BACK UP HP FILTER AND STILL THE SAME PRESSURE.CLOSE EDC AND PUMP THROUGH THE MOTOR,PRESSURE AT 3500 PSI AT 1 BPM.SHUT DOWN,OPEN EDC AND PUMP A COIL VOLUME TO SEE IF WE ARE PUMPING SOMETHING THROUGH THE COIL. RATE AT 1.1 BPM AND PRESSURE AT 2500 THEN SLOWLY CLIMBED TO 3000 PSI AND STABILIZED FOR—1 MIN NOW IT IS RISING AND PEAKED AT 3475 PSI AND IS SLOWLY DROPPING OFF.COIL PRESSURE STARTED DROPPING OFF AND THE WHP CLIMBED TO —200PSI THEN DROPPED OFF AND NOTHING WAS SEEN GOING ACROSS THE SHAKER. INCREASE RATE TO 1.5 BPM AND • PRESSURES ARE NORMAL.SHUT DOWN AND CYCLE EDC TO MAKE SURE IT STILL FUNCTIONS. EDC IS WORKING,CLOSE EDC AND PUMP THROUGH THE MOTOR TO MAKE SURE THE BHA IS CLEAR. BHA LOOKS CLEAR BUT WE ARE GOING TO PU AND VISUALLY INSPECT THE EDC TO MAKE SURE NOTHING IS WRONG 13:40 - 13:55 0.25 DRILL P PROD1 PJSM TO PU INJECTOR TO INSPECT BHA BIT GRADED AT 6-2-WT-N-X-I-BT-PR 13:55 - 14:40 0.75 DRILL P PROD1 PU INJECTOR FOUND GREASE PACKED AROUND BHA FROM EDC UP TO WHERE IT WOULD HAVE DIVERTED TO THE CHOKE LINE. PULLED BHA UP TO CHECK BIT AND THE BIT IS FINE,ALL JETS ARE CLEAR MU BHA 14:40 - 17:10 2.50 DRILL P PROD1 PT QTS AND RIH TAKING ALL RETURNS THROUGH THE MGS(WE HAVE 1 HAND DESIGNATED TO WATCH THE MGS STACK UNTIL WE TAKE RETURNS BACK TO THE _PITS 17:10 - 17:40 0.50 DRILL P PROD1 TIE IN AT 11200' Printed 10/17/2011 1.47:58PM North America -ALASKA- BP Page 27 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C:(2,530,972.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 t 64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:40 - 19:00 1.33 DRILL P PROD1 CORRECT DEPTH-22' FINISH CIRCULATING BOTTOMS UP. CLOSE EDC. FLUSH MGS WITH RIG WATER. 19:00 - 21:00 2.00 DRILL P PROD1 ` RIH PUMPING 1.3 BPM AT2900 PSI.33 FPM. MM IN/OUT=9.00/9.01 PPG IA/OA=249 PSV 2 PSI PVT=208 @ 12316' 21:00 - 00:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 14.066'TO 14.180'. ROP 55 FPH,WOB 1.7K, ECD OF 10.05 PPG IA=450 PSI,0A=7 PSI PUMPS AT 1.50 BPM WITH 3800 PSI,FS= 3650 PSI MM IN/OUT =9.04 PPG/9.06 PPG 9/30/2011 00:00 - 01:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 14,180'TO 14,200'. ROP 255 FPH,WOB 1.7K,ECD OF 10.15 PPG IA=480 PSI,OA= 13 PSI PUMPS AT 1.50 BPM WITH 3800 PSI,FS= 3650 PSI MM IN/OUT =9.04 PPG/9.06 PPG 01:00 - 05:20 4.33 DRILL P PROD1 WIPER TO WINDOW FROM 14,200'UP TO 11,332'. OPEN EDC AND CIRCULATE BU AT MAX RATE. WHILE CIRCULATING BU POH TO 9,200'AND RIH. 05:20 - 06:45 1.42 DRILL P PROD1 BU COMPLETE,CLOSE EDC AND TIH TO BOTTOM. ECD'S DROPPED FROM 10.15 PPG TO 9.61 PPG. 06:45 - 06:55 0.17 DRILL P PROD1 14120'OBTAIN SLOW PUMP RATES 06:55 - 07:35 0.67 DRILL P PROD1 TAG BOTTOM AND DRILL-40 FPH WITH 11K SURFACE WEIGHT AND 2.25K WOB(GOOD WT TRANSFER) CONTINUE DRILLING FROM 14,194' ROP 40 FPH,WOB 2.25K, ECD OF 10.08 PPG IA=475 PSI,OA=13 PSI PUMPS AT 1.4 BPM WITH 3550 PSI,FS=3420 PSI MM IN/OUT =9.03 PPG/9.03 PPG 07:35 - 07:55 0.33 DRILL P PROD1 STACKING A LITTLE WT,PU FOR A BHA WIPER HOLE IS A LITTLE RATTY CONTINUE POOH 13970'PULLING HEAVY RIH AND STACKED OUT,PU AND CONTINUE TRYING TO WORK BACK DOWN 07:55 - 08:30 0.58 DRILL P PROD1 POPPED FREE GOING DOWN,RIH UNTIL IT CLEANS UP THEN POOH PASSED TROUBLE SPOT TO MAKE SURE ITS CLEAN HOLE LOOKS GOOD, RIH TO CONTINUE DRILLING 08:30 - 09:20 0.83 DRILL P PROD1 CONTINUE DRILLING 09:20 - 12:20 3.00 DRILL P PROD1 CONTINUE DRILLING FROM 14,250' ROP 40 FPH,WOB 1.0 K,ECD OF 10.18 PPG IA=475 PSI,OA=13 PSI PUMPS AT 1.4 BPM WITH 3620 PSI,FS=3420 PSI MM IN/OUT =9.05 PPG/9.05 PPG Printed 1 0/1 7/201 1 1:47:58PM North America -ALASKA- BP Page 28 of 30 Aver Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:20 - 13:15 0.92 DRILL P PROD1 CONTINUE DRILLING FROM 14,300' ROP 20 FPH,WOB 1.5 K, ECD OF 10.13 PPG IA=463 PSI,OA=13 PSI PUMPS AT 1.35 BPM WITH 3350 PSI, FS= 3220 PSI MM IN/OUT =9.05 PPG/9.05 PPG 13:15 - 15:10 1.92 DRILL P PROD1 ROP HAS STEADILY DECLINED OVER THE LAST 2 HRS. IT IS TAKING 20K SURFACE WT TO DRILL 10 FPH IN A 20-30 API SAND WITH 1.8KWOB.THE BIT LOOKS LIKE ITS DONE. GEO SAYS WE STILL HAVE ABOUT 40% CHERT,IN THE SAMPLES.CALLED ODE TO DISCUSS POOH FOR BIT AND WE ARE GOING TO TRIP FOR A BIT AND SWAP MUD WHEN WE GET BACK TO BOTTOM 15:10 - 18:30 3.33 DRILL P PROD1 PULLED INTO CASING,OPEN EDC AND POOH. 18:30 - 18:45 0.25 DRILL P PROD1 CLOSE EDC FLOW CHECK-NO FLOW. 18:45 - 20:00 1.25 DRILL P PROD1 PJSM AND LD BHA#12. 20:00 - 21:00 1.00 DRILL P PROD1 PU BHA#13,NEW HYC TREX BIT,MOTOR AND AGITATOR. CLEAN HP FILTERS. 21:00 - 21:30 0.50 DRILL P PROD1 PT QTS TO 3500PSI. PT HP FILTERS TO 4000PS1. 21:30 - 23:30 2.00 DRILL P PROD1 RIH PUMPING.24BPM AT 857PSI. 23:30 - 00:00 0.50 DRILL P PROD1 GR TIE IN FROM 11,210'TO 11,243'. CORRECTION-23.5' 10/1/2011 00:00 - 01:35 1.58 DRILL P PROD1 RIH AND SWAP TO NEW MUD. 01:35 - 05:00 3.42 DRILL P PROD1 DRILLING FROM 14.313' ROP 40 FPH,WOB 1.0 K, ECD OF 10.01 PPG IA=420 PSI,OA=6 PSI PUMPS AT 1.5 BPM WITH 3000 PSI,FS=2800 PSI MM IN/OUT =8.97 PPG/9.00 PPG PVT=322 BBLS UP WT 37K,DN WT 8K 05:00 - 06:10 1.17 DRILL P PROD1 SHORT TRIP TO WINDOW.PULLING 23 FPM PUMPING 1.7 BPM AT 3500PSI. 06:10 - 08:50 2.67 DRILL N RREP 13,400.00 PROD1 SCR DROPPED MOTOR#1 DURING SHORT TRIP REDUCE PUMP RATE&PULLING SPEED UNTIL WE CAN BRING#1 BACK ONLINE 08:50 - 10:00 1.17 DRILL N RREP 11,300.00 PROD1 OPEN EDC AND POOH TO 9200'.-200'ABOVE THE 4-1/2"TUBING INTO THE 5-1/2"TUBING WHILE PUMPING A BOTTOMS UP 10:00 - 10:45 0.75 DRILL N RREP 9,200.00 PROD1 STOP AT 9200'AND SHUT DOWN POWER PACK TO INCREASE RATE FOR BOTTOMS UP 10:45 - 11:45 1.00 DRILL N RREP 9,200.00 PROD1 SHUT DOWN THE PUMP AMD POWER PACK. HOLD A PJSM FOR NORDIC TO DIAGNOSE THE PROBLEM WITH THE THE POWER. IF WE LOOSE RIG POWER DRILLER WILL STAY ON THE RIG FLOOR WITH 1 FLOOR HAND TO SHUT IN THE WELL WITH THE CHOKE AND DOUBLE BLOCK THEN GO TO THE KOOMEY THE MOTORMAN WILL BE IN THE MOTOR ROOM READY TO OPEN AIR FROM THE RIG TIRES TO START THE GENERATORS Printed 10/17/2011 1:47:58PM • North America -ALASKA- BP Page 29 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:OOAM Rig Release. 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:45 - 12:15 0.50 DRILL N RREP 9,100.00 PROD1 RIG ELECTRICIAN CANNOT FIND ANYHTING WRONG AND WOULD LIKE TO TRY DRILLING AGAIN.CALLED WTL AND DISCUSSED THE SITUATION AND WE ARE GOING TO TRY DRILLING AGAIN 12:15 - 12:30 0.25 DRILL P PROD1 TIE IN 12:30 - 14:00 1.50 DRILL P PROD1 -.CORRECT DEPTH+7',RIH TO TD 14:00 - 15:00 1.00 DRILL P PROD1 HAVING PROBLEMS GETTING BACK TO BOTTOM,STACKING WT&HAVE TO PU TO GET DEEPER OBTAIN SLOW PUMP RATES 15:00 - 21:15 6.25 DRILL P PROD1 CONTINUE DRILLING FROM 14,403' 12.6K SURFACE WEIGHT ROP 40 FPH,WOB 1.0 K, ECD OF 10.00 PPG IA=530 PSI,OA=13 PSI PUMPS AT 1.5 BPM WITH 3180 PSI,FS=3025 PSI MM IN/OUT =8.97 PPG/8.98 PPG PVT=300 BBLS UP WT 37K,DN WT 12.6K 21:15 - 00:00 2.75 DRILL P PROD1 WIPER TRIP TO WINDOW OPEN EDC 10/2/2011 00:00 - 01:30 1.50 DRILL P PROD1 LOG GR TIE IN AT 11,200'. CORRECTION PLUS 3'. POOH TO 10,500'. LOG CCL FROM 10,500'- 11,400' PUMPING 2.25 BPM @3600 PSI. 01:30 - 04:30 3.00 DRILL P PROD1 RIH TO BOTTOM.TAG AT 14,546'. GET SLOW PUMP RATES. 04:30 - 06:30 2.00 DRILL P PROD1 DRILLING FROM 14,545' ROP 40 FPH,WOB 1.25 K,ECD OF 9.87 PPG IA=592 PSI,OA=7 PSI PUMPS AT 1.57 BPM WITH 3930 PSI,FS= 3650 PSI MM IN/OUT =8.95 PPG/9.01 PPG PVT=254 BBLS UP WT 40K,DN WT 11K 06:30 - 08:00 1.50 DRILL P PROD1 DRILLING FROM 14,581' ROP 18 FPH,WOB 0.7 K,ECD OF 10.14 PPG IA=607 PSI,OA=7 PSI PUMPS AT 1.57 BPM WITH 3790 PSI,FS= 3650 PSI '{1 WOB 1.6K,SURFACE WT-8.7K MM IN/OUT =9.01 PPG/9.01 PPG PVT=242 BBLS 08:00 - 10:10 2.17 DRILL P PROD1 NOT MAKING ANY PROGRESS.PU AND TRY TO GET BIT TO DRILL.TAGGED BOTTOM WITH 8K SURFACE WT AND 40 PSI INCREASE IN MOTOR WORK.GOOD WT TRANSFER TO BIT-1.7K BUT NO ADDITIONAL MOTOR WORK.PU AND TRIED AGAIN WITH SAME RESULTS,BIT APPEARS TO BE WORN OUT. GEO CALLED TOWN GEO AND TD HAS BEEN CALLED.PU AND CONFIRM TD THEN POOH TO TIE IN 10:10 - 10:40 0.50 DRILL P PROD1 LOG TIE IN 10:40 - 12:00 1.33 DRILL P PROD1 CORRECT DEPTH+6',RIH TO TD SET DOWNS 14321' Printed 10/17/2011 1.47:58PM North America -ALASKA- BP Page 30 of 30 Operation Summary Report Common Well Name: H-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/29/2011 End Date: X3-010G9-C: (2,530,972.00) Project: Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:40 0.67 DRILL P PROD1 TAG BOTTOM BOTTOM AT 14589' ,START PUMPING LINER PILL WITH 5 PPB STICLESS BEADS 12:40 - 14:00 1.33 DRILL P PROD1 POOH LAYING IN LINER PILL W/BEADS 14:00 - 14:25 0.42 DRILL P PROD1 PUMP REMAINING LINER PILL WITH BEADS OUT OF THE COIL THEN OPEN EDC AND PERFORM 10 MIN NO FLOW CHECK 14:25 - 17:45 3.33 DRILL P PROD1 POOH AT 80%PAINTING LINER FLAGS AT: 10626'(EOP 10550')THIS IS 148'FROM BOTTOM WITH THE LINER ON 7426'(EOP 7350')THIS IS—44'ABOVE THE WINDOW WITH THE LINER ON 17:45 - 18:00 0.25 DRILL P PROD1 STOP AT 200'AND FLOW CHECK WELL AND HOLD PJSM TO LD THE BHA. 18:00 - 19:20 1.33 DRILL P PROD1 PU INJECTOR AND LD BHA. BIT GRADED 3-3-WT-A-X-1-BT-TD Printed 10/17/2011 1:47:57PM • North America -ALASKA- BP Page 1 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type: COM-ONSHORE(CON) Start Date: 9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/2/2011 19:20 - 22:20 3.00 CASING P RUNPRD PUMP 30 BBLS FRESH WATER FOR SLACK MANAGEMENT. CUT 220'OF E-LINE. MU INJECTOR TO WELL AND TRY TO PUMP SLACK MANAGEMENT AGAIN. PUMP MAX RATE 2.75 BPM at 4200 PSI. 22:20 - 22:35 0.25 CASING P RUNPRD INSTALL BAKER COIL TUBING CONNECTOR. PULL TEST TO 35K.PRESSURE TEST TO 4000 PSI. 22:35 - 23:35 1.00 CASING P RUNPRD DRIFT COIL WITH 3/4"BALL. PUMP 45 BBLS.POP INJECTOR OFF WELL AND LOOK FOR BALL. -_ 23:35 - 00:00 0.42 CASING P RUNPRD MU INJECTOR TO WELL AND CONTINUE PUMPING TO GET BALL AROUND. POP INJECTOR OFF WELL AND RECOVER BALL. 10/3/2011 00:00 - 01:00 1.00 CASING P RUNPRD POP INJECTOR OFF WELL AND RECOVER BALL. 01:00 - 06:00 5.00 CASING P RUNPRD _PJSM AND MU 2-3/8"LINER. 06:00 - 06:20 0.33 CASING P RUNPRD CREW CHANGE 06:20 - 06:40 0.33 CASING P RUNPRD PJSM TO CONTINUE RUNNING LINER 06:40 - 11:20 4.67_ CASING P RUNPRD MU LINER 11:20 - 12:15 0.92 CASING P RUNPRD LAST JOINT RAN,VALVE DRILL,FILL LINER 12:15 - 13:15 1.00 CASING P RUNPRD MU 6 JTS OF 2-1/16"CSH 13:15 - 13:30 0.25 CASING P RUNPRD PU INJECTOR AND MU TO THE LINER 13:30 - 15:30 2.00 CASING P RUNPRD PT QTS AND RIH 15:30 - 16:30 1.00 CASING P RUNPRD STOP AND GET UP AND DOWN WT PU WT=35K RIH WT=15K STOP AT FLAG 7350'EOP, UNCORRECTED DEPTH IS 11459.6' CORRECT DEPTH TO 11425.9' EOP FLAG 7350'+4075.92'=11425.92' 16:30 - 19:00 2.50 CASING P RUNPRD SET DOWN AT 13196' 13426' 13827'NOT GETTIN ANY DEEPER SHUT DOWN THE PUMP AND ABLE TO RIH 13886'NOT GETTIN ANY DEEPER SHUT DOWN THE PUMP AND ABLE TO RIH 14006' 14349' 19:00 - 20:40 1.67 CASING P RUNPRD WORKING LINER TO BOTTOM FROM 14,507' TO 14,577' PUMPING.4BPM AT 1652PSI. TAGGED TD 5 TIMES AT 14,577' UP WT 43K Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 2 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00©64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:40 - 21:30 0.83 CASING P RUNPRD DROP 5/8"STEEL BALL TO RELEASE FROM LINER. HEARD BALL GO OVER GOOSENECK AND SLOWED PUMP RATE TO.5BPM. PVT=318 BBLS. BALL ON SEAT AT 29.5 BBLS.SHEARED OUT AT 3800PS1. CEASE FROM LINER UP WT 29K. 21:30 - 00:00 2.50 CASING P RUNPRD SWAP WELL OVER TO 9PPG XS KCL. PUMPING 1.8 BPM THE LOSSES ARE-36BPH. AT 1.0 BPM THE LOSSES ARE-17BPH. 10/4/2011 00:00 - 01:00 1.00 CASING P RUNPRD CONTINUEDISPLACING WELL TO 9PPG KCL. 01:00 - 01:15 0.25 CASING P RUNPRD 5 MINUTE FLOW CHECK-NO FLOW.ON VACUUM.LOST 3BBL IN 5 MINUTES. 01:15 - 06:30 5.25 CASING P RUNPRD CALL TOWN AND CHANGE PLAN TO SWAP WELL TO 2%XS KCL AT 8.4PPG. LOST RATE 36BPH. 06:30 - 10:15 3.75 CASING P RUNPRD 2 TRUCKS WITH 8.4 PPG KCL ON LOCATION START 8.4 DOWN HOLELOOSING BETWEEN 0.3-0.7 BPM 10:15 - 11:00 0.75 CASING P RUNPRD`8.4 PPG KCL AT SURFACE,LOSSES-0.3 BPM SHUT DOWN FOR 30 MIN NO-FLOW CHECK 11:00 - 11:15 0.25 CASING P RUNPRD ,HAD TO RESTART CTDS,ONLINE WITH PUMP WELL TOOK 9 BBLS IN 45 MIN(STATIC) 0.3 BPM LOSSES WHILE PUMPING CALL ODE AND TO DISCUSS CALLING CMT CREW OUT CALL OUT CMT CREW @ 11 am 11:15 - 13:15 2.00 CASING P' RUNPRD CIRC BOTTOMS UP FROM 10793'TO SEE IF WE GET AND GAS 13:15 - 13:30 0.25 CASING P RUNPRD BOTTOMS UP WAS CLEAN,NO GAS 13:30 - 13:50 0.33 CASING P RUNPRD CMT CREW ON LOCATION PJSM TO SPOT AND RU 13:50 - 14:40 0.83 CASING P RUNPRD RU CMT EQUIPMENT 14:40 - 15:10 0.50 CASING P RUNPRD PJSM TO PUMP CMT 15:10 - 15:45 0.58 CASING P RUNPRD START BATCHING CMT CMT TO WEIGHT @ 15:35(THICKENING TIME 5:09) Printed 10/17/2011 1:48.16PM forth America -ALASKA- BP Page 3 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 9/8/2011 End Date: 'X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI: 500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:45 - 18:45 3.00 CASING P RUNPRD SAMPLE SENT BACK TO LAB 15:45-SHUT DOWN RIG PUMP&LINE UP CMT VAN TO REEL 15:55-CMT VAN ONLINE WITH KCL 16:00-PT CMT LINE TO 250 LOW AND 6600 PSI HIGH 16:05-GOOD PT,ONLINE WITH CMT,ZERO IN MM @ 13.5 PPG 16:24-14.2 BBLS IN COIL SHUT DOWN CMT PUMP, LINE UP TO BACK FLUSH CMT LINE WITH BIOZAN 16:30—ONLINE WITH BIOZAN WITH RIG PUMP AT 1.5 BPM, PUMP PSI 3K TO 3.5K.CIRC PRESSURE CLIMBING REDUCE RATE FROM 1.5 TO 1.2 BPM UNTIL CMT STARTS OVER GOOSNECK 16:50—40 BBLS AWAY 1.5 BPM @ 3450 PSI, CIRC PRESSURE DROPPING AS CMT IS BEING PUMPED INTO LINER 16:58-SHUT DOWN PUMP,51.7 BBLS PUMPED, PU TO SIDE EXHAUST 2 BBLS CMT AND 3 BBLS BIOZAN. PU WT AT 14566', PU TO 114533'(13')TO OPEN EXHAUST PORTS 17:01 —ZERO IN MM,ONLINE WITH PUMP TO SIDE EXHAUST 5 BBLS AT 1.5 BPM.REDUCE RATE, BTT HAND SAYS WE ARE LIMITED TO 1800 PSI. 17:09-5 BBLS AWAY,SHUT DOWN PUMP AND OPEN BAKER CHOKE TO STING BACK IN TO LINER 17:11 —SET BACK DOWN TO-7.5K(PIT#1 HAS 80.5 BBLS)ZERO IN MM AND CLOSE BAKER CHOKE w 17:13—ONLINE WITH PUMP TO SHEAR LWP 17:14-LWP SHEARED AT 3200 PSI, • INCREASE RATE TO 1.5 BPM. 14.8 BBLS TO BUMP 17:15—REDUCE RATE TO STAY BELOW 4000 \ PSI f1 17:16-CMT AT SHOE ZERO OUT MM 17:17-4000 PSI ON PUMP,RATE AT 1.0 17:20—RATE AT 0.75 BPM AT 4000 PSI 17:23-RATE DOWN TO 0.5 BPM @ 4200 PSI 17:30—11.5 BBLS AWAY, PUMP RATE IS DOWN TO 0.3 BPM AT 4300 PSI.CALL OTL FOR APPROVAL TO INCREASE PREASURE ABOVE 4500 PSI IF NEEDED.GOT APRROVAL FROM OTL TO EXCEED 4500 PSI BY BYPASSING LOWER PRESSURE RATED EQUIPMENT IN THE SYSTEM. 17:33-PRV ON PUMP#2 SHEARED AT 4500 PSI.SWAP TO PUMP#1. 12.7 BLS PIT#1 VOLUME HAS INCREASED 8 BBLS.BYPASS IN MM CIRC PRESSURE GETTING CLOSE TO MM MAX 17:39-ONLINE WITH PUMP#1,PIT#1 VOLUME HAS INCREASED 8.36 BBLS 17:45—WE ARE NOT ABLE TO KEEP THE OUT MM FULL OF FLUID WHICH THROWS THE RATE AND VOLUME OFF.VOLUME IN PIT#1 HAS INCREASED 8.5 BBLS SINCE SHEARING THE LWP Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 4 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00©64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:52—WE ARE DOWN TO 0.1 BPM @ 4350 PSI CALL ODE TO DISCUSS OPTIONS.BTT HAND DOES NOT WANT TO BRING PRESSURE OVER 4500 PSI BECAUSE WE ARE TO CLOSE TO THE STAGE COLLAR.PIT #1 VOLUME HAS INCREASED 8.7 BBLS 18:10—CALL ODE TO DISCUSS OPTIONS, ODE CALLING ETL.WE HAVE 2:34 OF THICKENING TIME LEFT ON CMT.PIT#1 VOLUME AT 18:26-NO PROGRESS ODE WANTS A CONFERENCE CALL WITH ETL.PIT#1 VOLUME INCREASE AT 9 BBLS 18:42—DECISION MADE TO POOH FOR CLEAN OUT BHA MICRO-MOTION AND PUMP VOLUMES SHOW WE HAVE 13.7 BBLS OF CMT BEHIND PIPE. PIT#1 VOLUME INCREASED BY 9 BBLS. NOTE:WE NEVER HAD 1:1 RETURNS DURING THE JOB THUS THE REASON FOR LES VOLUME IN PIT#1. 18:45 - 19:00 0.25 CASING P RUNPRD APPLY 500PSI ON LINER.UNSTING SELBRT. CIRCULATE 5BBLS OF BIOZAN.1 FOR 1 RETURNS.TAG TOL @ 10,697FT. FLOWCHECK @ 10,650FT.PVT 184BBLS, NO FLOW.POOH. 19:00 - 19:30 0.50 CASING P RUNPRD POOH. PAINT EOP FLAG @ 9,500FT. 19:30 - 21:15 1.75 CASING P RUNPRD POOH WITH 0.75BPM RETURNS.1 FOR 1 RETURNS. 21:15 - 23:00 1.75 CASING P RUNPRD HOLD PJSM.COIL OOH @ 21:20HRS.BREAK OUT TOOLSTRING AND LAY DOWN SELBRT- NOTE CEMENT IN SELBRT.BAKER HAND TAKES TOOL TO SHOP TO CLEAN OUT SELBRT AND CONFIRM 5/8"BALL SET PROPERLY IN SELBRT. RIG UP ELEVATORS FOR HANDLING 1"CSH HYDRIL. TOP UP PITS WITH KCL AND MIX WITH 2PPB BIOZAN. 23:00 - 00:00 1.00 CASING P RUNPRD BAKER HAND CALLS AND CONFIRMS BALL / COULD NOT BE ALLOCATED FOR. f/ RIG DOWN ELEVATORS,M/U PUP-JOINT& NOZZLE("SWIZZEL-STICK"). 10/5/2011 00:00 - 00:15 0.25 CASING P RUNPRD STAB ON INJECTOR HEAD. 00:15 - 01:00 0.75 CASING P RUNPRD DROP 3/4"BALL.PUMP BALL THROUGH COIL AT 3BPM. PUMP 65BBLS,RECEIVE BACK 3/4"BALL,BUT NO INDICATION FOR 5/8"BALL.PROOF THAT COIL IS CLEAR AND DRIFTED. 01:00 - 01:30 0.50 CONDHL P OTHCMP HOLD PJSM BEFORE MAKING UP 2 3/8"LINER CLEAN-OUT BHA(BHA#15). 01:30 - 05:30 4.00 CONDHL P OTHCMP M/U BHA C/W 1.75"MILL,MOTOR,JARS AND 132 JOINTS 1"CSH HYDRIL TUBING. CONFIRM TOURQUE ON 1"CSH STANDS._ 05:30 - 06:00 0.50 CONDHL P OTHCMP COMMENCE RIH WITH 2 3/8"LINER CLEAN-OUT BHA. 06:00 - 07:50 1.83 CONDHL P OTHCMP CREW CHANGE WHILE RIH Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 5 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type: COM-ONSHORE(CON) Start Date:9/8/2011 End Date. X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:50 - 09:00 1.17 CONDHL P OTHCMP WT CHECK ABOVE TOP OF LINER,PU WT 23.5K,RIH WT 11.0K 1.1 BPM @ 3700 PSI 09:00 - 09:45 0.75 CONDHL P OTHCMP WT CHECK,PU WT 32.0K 09:45 - 10:05 0.33 CONDHL P OTHCMP SET DOWN AT 13700'LOOKS LIKE WT TRANSFER PROBLEM NO MOTOR WORK. SHUT DOWN PUMP AND ABLE TO RIH. SEVERAL SET DOWNS TO 13770',ADD NSX LUBE TO FLUID FOR METAL TO METAL FRICTION 10:05 - 10:15 0.17 CONDHL P OTHCMP GETTING CMT BACK,SENDING RETURNS TO THE CUTTINGS BOX STILL STACKING WT,WE ARE ABLE TO MAKE SOME FOOTAGE BY CYCLING PUMP 10:15 - 10:55 0.67 CONDHL P OTHCMP MADE IT TO 13916'AND SET DOWN AGAIN. PU SLOW WHILE CIRCULATING FLUID DOWN WITH NSX LUBE 10:55 - 11:20 0.42 CONDHL P OTHCMP NSX LUBE AT THE MILL,CIRC PRESSURE DROPPING FROM 3850 PSI @ 1 BPM TI 3200 PSI,RIH FROM 13840'. RIH WT IS WHAT IT WAS BEFORE ENTERING THE LINER 11:20 - 11:25 0.08 CONDHL P OTHCMP KEEPING RETURNS,SENT 75 BBLS TO CUTTINGS BOX 11:25 - 11:35 0.17 CONDHL P OTHCMP SEEING A LITTLE WEIGHT LOSS AND SLIGHT BIT OF MOTOR WORK 11:35 - 11:50 0.25 CONDHL P OTHCMP TAG AND GETTING MOTOR WORK,MOTOR WORK INCREASING AND NOT GETTING ANY WEIGHT BACK. LOOKS LIKE WE HAVE A HARD BOTTOM, SHUT DOWN THE PUMP AND PU TO TAG A COUPLE TIMES TO VERIFY 11:50 - 13:00 1.17 CONDHL P OTHCMP GOOD SOLID TAGS AT 14502'AND MOTOR WORK,POOH FOR LOGGING TOOLS STOP AT 14310'BIT DEPTH 10200'EOP AND PAINT A WHITE FLAG 13:00 - 14:30 1.50 CONDHL P OTHCMP PAINT FLAG AT TOP OF LINER FOR LOGGING RUIN FLAG AT 10600'BIT DEPTH AND 6490' EOP DEPTH,FLOW CHECK WELL AND POOH 14:30 - 14:45 0.25 CONDHL P OTHCMP STOP AT 200'AND FLOW CHECK WELL WHILE HOLDING PJSM TO PULL CLEAN OUT BHA 14:45 - 18:30 3.75 CONDHL P OTHCMP GOOD NO-FLOW,PU INJECTOR AND SET ON LEGS PULL BHA 18:30 - 19:00 0.50 CONDHL P OTHCMP BHA OOH AND LAYED DOWN.CLEAR AND TIDY UP RIGFLOOR. 19:00 - 19:30 0.50 CONDHL P OTHCMP HOLD PJSM BEFORE M/U LOGGING BHA. 19:30 - 21:00 1.50 CONDHL P OTHCMP M/U BHA#16C/W GR/CCL/CNL AND 132 JOINTS OF 1"CSH. 21:00 - 23:00 2.00 CONDHL P OTHCMP PERFORMED"KICK WHILE TRIPPING"DRILL (1:45MIN TO S/I WELL).VERY GOOD DRILL, CREWS PERFORMED WELL. CONTINUE M/U 1"CSH TUBING AS PART OF LOGGING-BHA. 23:00 - 23:20 0.33 CONDHL P OTHCMP FLUID PACK COIL,RESET MECHANICAL COUNTER, RE-STRAP PITS:281bbls PVT. Printed 10/17/2011 1:48:16PM North America -ALASKA - BP Page 6 of 13 Operation Summary Report Common Well Name. H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:20 - 00:00 0.67 CONDHL P OTHCMP RIH @ 70FPM.MEANWHILE PREPARE PERF PILL(120K LSRV,8.6PPG,2%LO-TORQ)IN PIT 4. 10/6/2011 00:00 - 01:15 1.25 CONDHL P OTHCMP CONTINUE RIH AT 70FPM.AT 10,500FT,SLOW DOWN TO 30FPM AND COMMENCE LOGGING. OBSERVE FLAG AT 10,620'BIT DEPTH(8' DEEP).NO DEPTH CORRECTION MADE, CONTINUE RIH. 01:15 - 03:20 2.08 CONDHL P OTHCMP SIT DOWN ON TOL @ 10,715.6'. INCREASE PUMP RATE FROM 0.5 BPM TO 1.2 BPM AND WE WERE ABLE TO ENTER LINER. CONTINUE RIH AT 30FPM. START PUMPING PERF-PILL DOWN COIL @ 02:30HRS. 03:20 - 03:30 0.17 CONDHL P OTHCMP AT 14,424'SET DOWN,PU CLEAN SHUT DOWN PUMP AND RAN IN HOLE PAST SET DOWN DEPTH AND CONTINUE RIH. 03:30 - 04:50 1.33 CONDHL P OTHCMP TAG TD @ 14,504.4'.POOH AT 60FPM, LAYING IN PERF PILL @ 0.5BPM. 04:50 - 05:00 0.17 CONDHL P OTHCMP PULL UP TO 10,500'.FLAG PIPE WITH WHITE PAINT AT 6,378.4'EOP-DEPTH. PERFORM NO-FLOW CHECK-WELL NOT FLOWING. 05:00 - 06:00 1.00 CONDHL P OTHCMP`CONTINUE POOH.CIRCULATE AT 1 BPM, 2,758PSI CIRCULATING PRESSURE. 06:00 - 06:20 0.33 CONDHL P OTHCMP STOP AT 200'TO FLOW CHECK WELL AND HOLD PJSM TO STBK LOGGING BHA CREW CHANGE 06:20 - 06:40 0.33 CONDHL P- OTHCMP PJSM TO STBK LOGGING BHA 06:40 - 09:45 3.08 CONDHL P OTHCMP PU INJECTOR AND SET ON LEGS AND START PULLING STANDS 09:45 - 10:05 0.33 CONDHL P - OTHCMP 1 STAND LEFT,STOP FOR PJSM TO BRING SOURCE TO SURFACE CALL OUT SLB TCP HANDS 10:05 - 10:30 0.42 CONDHL P OTHCMP LAY DOWN 2 JTS OF 1"CSH TO GET TO THE LOGGING TOOLS REMOVE SOURCE,SECURE AND LOWER SOURCE KEG TO THE GROUND.LOAD OUT LOGGING TOOLS TO DOWNLOAD DATA 10:30 - 10:40 0.17 CONDHL P OTHCMP LOGGING BHA LAID DOWN,PREP TO JET STACK AND TEST LINER LAP 10:40 - 10:50 0.17 CONDHL P OTHCMP PJSM TO JET STACK AND TEST LINER LAP 10:50 - 11:00 0.17 CONDHL P OTHCMP PU INJECTOR AND MU SWIZZLE STICK NOZZLE 11:00 - 11:25 0.42 CONDHL P OTHCMP JET STACK Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 7 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473 00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12.00:OOAM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:25 - 12:25 1.00 CONDHL P OTHCMP PREP TO TEST LINER LAP CEMENT COMPRESSIVE STRENGTH WAS 2000 PSI AT 11:34 AM ON 10/5 11:33 LOW PT 253 PSI,LOW PT GOOD(249 PSI)ON LINE FOR HIGH PT WHP @ 2432 PSI,SHUT DOWN PUMP AND WAIT FOR STABILIZATION START LAP TEST 11:55 WHP=2400 PSI MAX PRESSURE LOSS FOR TEST IS 240 PSI 11:56 WHP=2368 PSI 11:57 WHP=2344 PSI 11:58 WHP=2333 PSI 11:59 WHP=2314 PSI 12:00 WHP=2292 PSI 12:01 WHP=2278 PSI 12:02 WHP=2267 PSI 12:03 WHP=2252 PSI 12:04 WHP=2238 PSI 12:05 WHP=2230 PSI 12:06 WHP=2219 PSI 12:07 WHP=2208 PSI 12:08 WHP=2197 PSI 12:09 WHP=2190 PSI 12:10 WHP=2179 PSI 1ST 15 MIN LOST 225 PSI 12:11 WHP=2172 PSI 12:12 WHP=2161 PSI 12:13 WHP=2153 PSI LAP TEST FAILED, LOST MORE THAN 10%OF INITIAL TEST PRESSURE.CALLED ODE AND WE ARE NOT GOING TO TRY AND RETEST.BLEED OFF AND PREP FOR PERF RUN 12:25 - 12:45 0.33 CONDHL P OTHCMP LOAD PER GUNS IN PIPE SHED REMOVE INJECTOR FROM THE WELL AND LD NOZZLE 12:45 - 13:10 0.42 CONDHL P OTHCMP PREP TO FUNCTION TEST BOP 13:10 - 13:30 0.33 CONDHL P OTHCMP FUNCTION TEST BOPE FROM OPS CAB AND FLOOR 13:30 - 14:30 1.00 CONDHL P OTHCMP LOG CORRECTION-7' LOAD PERF EQUIPMENT ON RIG 14:30 - 14:50 0.33 CONDHL P OTHCMP PJSM TO RUN PERF GUNS CALLED WTL WITH FAILED LAP TEST INFO BEFORE PROCEEDING, 14:50 - 15:40 0.83 CONDHL P OTHCMP MU PERF GUNS 15:40 - 18:00 2.33 CONDHL P OTHCMP PERF GUNS RAN MU CSH 18:00 - 19:00 1.00 CONDHL P OTHCMP PU INJECTOR AND MU TO BHA 19:00 - 20:16 1.27 CONDHL P OTHCMP ADJUST DEPTH COUNTER TO 4,298.41 FT (BHA-LENGTH). RIH WITH BHA#17 @ 95.5FPM,PUMP-RATE 0.2BPM,PVT 282BBLS. 20:16 - 21:35 1.32 CONDHL P OTHCMP AT FLAG,CORRECT DEPTH FROM 10,681.34' TO 10,669.71'(-11.63'DEPTH CORRECTION. ENTER LINER WITHOUT ANY PROBLEM. CONTINUE TO RIH @ 50FPM,PUMP-RATE 0.17BPM. Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 8 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:35 - 22:15 0.67 CONDHL P OTHCMP TAG PBTD @ 14,496'.PU TO BREAKOVER (32K LBS). RIH,SAT DOWN AGAIN @ 14,498'.PU TO BREAKOVER(32K LBS). CORRECT DEPTH TO 14,494'PBTD(-4'DEPTH CORRECTION. -ESTABLISH CIRCULATION PRESSURES FOR E-FIRE FIRING SEQUENCE: CIRCULATE @ 0.3BPM AT-650PS1 CIRC PRESSURE CIRCULATE @ 0.9BPM AT—4,200PSI CIRC PRESSURE 22:15 - 22:30 0.25 CONDHL P OTHCMP PU TO 14,492'AND START FIRING SEQUENCE.FIRING SEQUENCE UNSUCCSSFUL,NO INDICATION FOR PERF GUNS GOING OFF. 22:30 - 23:00 0.50 CONDHL P OTHCMP RIH AND PU TO 14,492'. RESTART FIRING SEQUENCE: 22:37. START SEQUENCE,PUMPS STOP 22:39 PUMP 0.33BPM/600PSI CIRC PRESSURE 22:41 PUMP 1.10BPM/3,850PSI CIRC PRESSURE 22:42 PUMP 0.30BPM/CIRC PRESSURE FALLING DOWN TO 1,070PSI 22:43 PUMP 1.05BPM/CIRC PRESSURE INCREASING UP TO 4,320PSI 22:44 PUMP 0.37BPM/CIRC PRESSURE FALLING DOWN TO I,350PS1 22:45 PUMP 1.15BPM/CIRC PRESSURE INCREASEING UP TO 4,470PSI 22:46 PUMP 0.35BPM/CIRC PRESSURE FALLING DOWN TO 1,274PSI 22:47 PUMP 1.00BPM/CIRC PRESSURE INCREASING UP TO 4,480PS1 22:49 PUMP 0.35BPM/CIRC PRESSURE FALLING DOWN TO 900PSI 22:51 START PU COIL @ 2FPM 22:51 PERF GUNS GO OFF @ 14,491.40', PLACING THE BOTTOM SHOT @ 14490.7'(0.7' DEEP).VERY GOOD INDICATION OF FIRING. 23:00 - 00:00 1.00 CONDHL P OTHCMP START POOH @ 50FPM,PUMPS S/I. PUMP DOWN BACKSIDE OF COIL, MAINTAINING 100PSI WHP,PUMPING AT 0.7BPM.PVT 308BBLS. 10/7/2011 00:00 - 01:15 1.25 CONDHL P OTHCMP CONTINUE TO POOH TO 200FT. 01:15 - 01:30 0.25 CONDHL P OTHCMP GOOD NO-FLOW.HOLD PJSM BEFORE LAYING DOWN BHA.PVT 273bb1s. 01:30 - 05:00 3.50 CONDHL P OTHCMP PULL BHA#17 OOH.BREAK OFF INJECTOR, STAND BACK INJECTOR AND SET ON LEGS. BREAK OUT BHA. 05:00 - 06:00 1.00 CONDHL P OTHCMP PJSM BEFORE LAYING DOWN SPENT GUNS. GUNS DETONATED WITH ALL CHARGES FIRED. 06:00 - 06:30 0.50 CONDHL P OTHCMP CREW CHANGE 06:30 - 07:45 1.25 CONDHL P OTHCMP PREP TO UNLOAD GUNS FROM RIG 07:45 - 08:00 0.25 CONDHL P OTHCMP PJSM TO MU LTP BHA Printed 10/17/2011 1.48:16PM Pae9of13 North America ALASKA- BP 9 Operation Summary Report Fi13 . E.. Common Well Name: H-04 AFE No Event Type: COM-ONSHORE (CON) Start Date: 9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.: NORDIC 1 I Spud Date/Time: 8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor: NORDIC CALISTA UWI: 500292010400 Active Datum.6: 04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 09:00 1.00 CONDHL P OTHCMP MU BHA#18 09:00 - 11:25 2.42 CONDHL P OTHCMP RIH 11:25 - 11:40 0.25 CONDHL P OTHCMP WT CK UP WT 28K, RIH WT 14.5K 11:40 - 12:40 1.00 CONDHL P OTHCMP 10721.54'PRESSURE INCREASE,SHUT DOWN PUMP AND STING INTO LINER 10730.0'SET DOWN WITH 10K DOWN WEIGHT 11:45 PU TO UP BALL DROP POSITION AND DROP A 5/8"BALL TO SET LTP 12:10 REDUCE RATE AT 25 BBLS TO LAND BALL ON SEAT 12:25 BALL ON SEAT AT 33.4 BBLS, BLEED OFF RIH TO TAG PU 2 FT PAST UP WT AT 10720.3' INCREASE PRESSURE TO 1850 PSI TO SET THE SLIPS STACK 10K TO SET THE PACKER,10726.4' 12:40 - 13:30 0.83 CONDHL P OTHCMP LTP IS SET, LINE UP DOWN THE BACKSIDE TO PERFORM MIT ON LTP 12:45 267 PSI,GOOD LOW PT 264. INCREASE PRESSURE TO 2400PSI START LTP MIT 12:57 WHP 2400 PSI 12:58 WHP 2473 PSI 12:59 WHP 2453 PSI 13:00 WHP 2336 PSI 13:01 WHP 2314 PSI 13:02 WHP 2292 PSI 13:03 WHP 2267 PSI 13:04 WHP 2252 PSI 13:05 WHP 2230 PSI 13:06 WHP 2208 PSI 13:07 WHP 2190 PSI 13:08 WHP 2163 PSI 13:09 WHP 2150 PSI MIT FAILED OPEN UP AND BRING PRESSURE BACK UP TO 2400PSI 13:14 WHP 2413 PSI 13:15 WHP 2380 PSI 13:16 WHP 2363 PSI 13:17 WHP 2340 PSI 13:18 WHP 2318 PSI 13:19 WHP 2292 PSI 13:20 WHP 2271 PSI 13:21 WHP 2249 PSI 13:22 WHP 2223 PSI 13:23 WHP 2205 PSI 13:24 WHP 2175 PSI 13:25 WHP 2157 PSI 13:26 WHP 2139 PSI MIT FAILED CALL ODE 13:30 - 14:25 0.92 CONDHL P OTHCMP CALL ODE TO DISCUSS MIT FAILURES ODE WANTS A CONFERENCE CALL 14:25 - 14:51 0.43 CONDHL P OTHCMP WORK COIL UP AND DOWN TO TRY AND ENERGIZE THE PACKER A LITTLE MORE Printed 10/17/2011 1:48:16PM North America -ALASKA- BP Page 10 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project: Prudhoe Bay Site: PB H Pad Rig Name/No.:NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release. 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:51 - 15:25 0.57 CONDHL P OTHCMP RETEST LTP.MIT FAILED LOST 240 PSI IN ABOUT 8 MIN COIL PRESSURE INCREASED FROM 1443 PSI TO 1540 PSI SUSPECT BHA MIGHT BE LEAKING POSSIBLY AT THE CTC OR QUICK CONNECT 15:25 - 16:42 1.28 CONDHL P OTHCMP TRY BRINGING BOTH WHP AND COIL PRESSURE TO SEE IF THE PRESSURES ARE STABLE 15:32 WHP 1978 PSI 15:33 WHP 1948 PSI 15:34 WHP 1941 PSI 15:35 WHP 1912 PSI 15:36 WHP 1897 PSI 15:37 WHP 1824 PSI 15:38 WHP 1809 PSI 15:39 WHP 1783 PSI 15:40 WHP 1772 PSI 15:41 WHP 1750 PSI 15:42 WHP 1723 PSI MIT FAILED BOTH COIL AND WHP TRACKED DURING THE BLEED OFF CALL ODE TO DISCUSS 16:42 - 19:55 3.22 CONDHL N DFAL OTHCMP DECISION MADE TO PULL PACKER AND POOH TO PU A MECHANICAL SET LTP LTP PULLED FREE AT 68K.STOP AND ALLOW PACKER TO RELAX PVT=95 BBLS LINE UP TO PUMP DOWN THE BACKSIDE AND MAINTAIN POSITIVE WHP 10550'LOST 20K WEIGHT AND WHP,STOP AND MONITOR THEN POOH MAINTAINING PROPPER DISPLACEMENT 19:55 - 20:10 0.25 CONDHL N DFAL OTHCMP PERFORM FLOW-CHECK AT 200FT-GOOD NO FLOW,WELL STABLE. MEANWHILE HOLD PJSM BEFROE BREAKING OUT BHA. 20:10 - 21:15 1.08 CONDHL N DFAL OTHCMP POOH,PU INJECTOR AND SET ON LEGS AND LD BHA#18.OBSERVE THAT MIDDLE PACKER ELEMENT ON LINER TOP PACKER IS MISSING. PRESSURE-TEST CTC,QC AND DISCONNECT TO 3,500PSI.NO LEAKS OR LOSSES OBSERVED. 21:15 - 22:05 0.83 CONDHL N DFAL OTHCMP REHEAD COIL.PRESSURE-TEST CTC TO 3,500PSI,PULL-TEST TO 35K. 22:05 - 22:30 0.42 CONDHL N DFAL OTHCMP M/U VENTURI-BASKET BHA(BHA#19). 22:30 - 23:00 0.50 CONDHL N DFAL OTHCMP PU INJECTOR,PRESSURE TEST QUICK TEST SUB TO 3,500PSI.FLUID-PACK COIL. 23:00 - 00:00 1.00 CONDHL N DFAL OTHCMP COMMENCE RIH @ 95FPM.PVT=150BBLS. 10/8/2011 00:00 - 00:20 0.33 CONDHL N DFAL OTHCMP CONTINUE RIH. 00:20 - 01:30 1.17 CONDHL N DFAL OTHCMP AT 9,300'COMMENCE VENTURI-JETTING OPS:INCREASE PUMP-RATE FROM 0.6BPM TO 1.7BPM,CIRC PRESSURE RAISES FROM 620PS1 TO3,600PSI. CONTINUE RIH @ 30FPM.PVT=178 Printed 10/17/2011 1:48:16PM Page 11 of 13 North America -ALASKA- BP Operation Summary Report .,101,1 ,. Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud DaterTime:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 02:20 0.83 CONDHL N DFAL OTHCMP TAG LINER @ 10,722'. OBSERVE SLIGHT DROP IN OUT DENSITY. APPLY 100PSI BACKPRESSURE ON WELL AS PRECAUTION. 02:20 - 03:50 1.50 CONDHL N DFAL OTHCMP SWAP FLUIDS TO CLEAN 2%KCL 03:50 - 05:20 1.50 CONDHL N DFAL OTHCMP COMMENCE POOH. 05:20 - 05:30 0.17 CONDHL N DFAL OTHCMP"PERFORM FLOW-CHECK AT 200FT-GOOD NO FLOW,WELL STABLE. MEANWHILE HOLD PJSM BEFROE BREAKING OUT BHA. 05:30 - 09:15 3.75 CONDHL N DFAL OTHCMP POOH, PU INJECTOR AND SET ON LEGS AND LD BHA#19. PACKER ELEMENT WAS NOT RECOVERED CALL ODE TO DISCUSS PLAN FORWARD BTT HAND FOUND A CHUCK OF RUBBER IN THE VENTURI THAT IS PART OF A TOP SEAL FROM ONE OF OUR BOP RAMS. IF WE DECIDE TO RIH WE WILL NEED TO OPEN THE BOP'S TO FIND WHICH SEAL IS DAMAGED AND THEN TEST EACH RAM THAT WAS REMOVED. ODE IS GOING TO DISCUSS OPTIONS WITH WTL AND ETL 09:15 - 09:20 0.08 CONDHL N DFAL OTHCMP DECISION MADE TO RDMO AND TURN WELL QVER TO WELLS GROUP TO COMPLETE CALL OUT LRS TO DISPLACE WELL WITH DIESEL FREEZE PROTECT 09:20 - 09:35 0.25 CONDHL P OTHCMP PJSM TO OFF LOAD BTT EQUIPMENT RU NIGHT CAP 09:35 - 10:20 0.75 CONDHL P OTHCMP OFF LOAD BTT EQUIPMENT AND PREP TO PT NIGHT CAP 10:20 - 11:00 0.67 CONDHL P OTHCMP PT TREE CAP 200 PSI LOW AND 3500 PSI HIGH 11:00 - 11:35 0.58 CONDHL P OTHCMP ONLINE FOR INJECTION RATE TEST INJECTIVITY AT 0.45 BPM @ 1770 PSI 11:35 - 12:20 0.75 CONDHL P OTHCMP PUMPED 14 BBLS INTO PERFS 12:20 - 12:50 0.50 CONDHL P OTHCMP PU INJECTOR AND BLOW BACK KCL WITH AIR TEMP @ 25° 12:50 - 13:05 0.25 CONDHL P OTHCMP SET INJECTOR DOWN AND PREP TO BH FREEZE PROTECT WITH LRS 13:05 - 13:15 0.17 CONDHL P OTHCMP PJSM WITH LRS TO PUMP DIESEL 13:15 - 13:30 0.25 CONDHL P OTHCMP RU LRS TO CMT LINE 13:30 - 14:15 0.75 CONDHL P OTHCMP PT LRS LINE PRESSURE KEEPS DROPPING OFF BELOW LRS STANDARDS 14:15 - 14:35 0.33 CONDHL P OTHCMP GOOD LOW GOING TO HIGH 14:30 HIGH PRESSURE HAS STABILIZED, START HIGH PT 14:35 - 14:40 0.08 CONDHL P OTHCMP GOOD HIGH PT,BLEED BACK AND LINE UP TO BH DIESEL 14:40 - 18:10 3.50 CONDHL P OTHCMP ONLINE WITH DIESEL DOWN THE BACKSIDE @ 0.4 BPM,1,900PSI. 15:05 10 BBLS AWAY 15:40 20 BBLS AWAY 16:15 30 BBLS AWAY 16:45 40 BBLS AWAY 17:15 50 BBLS AWAY 17:55 60 BBLS AWAY Printed 10/17/2011 1:48:16PM • North America -ALASKA- BP Page 12 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date X3-010G9-C: (1,184,473.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.: NORDIC 1 Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 Rig Contractor:NORDIC CALISTA UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:00 1.00 CONDHL P OTHCMP BLEED OFF TO OPSI AND MONITOR WELL. 19:00 - 20:15 1.25 CONDHL P OTHCMP WAIT ON VALVE&GREASE CREW TO ARRIVE AT LOCATION. 20:15 - 20:30 0.25 CONDHL P OTHCMP HELD PJSM WITH CREWS BEFORE COMMENCING XMAS TREE. 20:30 - 21:30 1.00 CONDHL P OTHCMP GREASE SWAB VALVE,SSV AND MV. PRESSURE-TEST MV TO 3,500PSI. 21:30 - 22:00 0.50 CONDHL P OTHCMP LIFT VALVE CREW'S EQUIPMENT ONTO RIGFLOOR. 22:00 - 22:15 0.25 CONDHL P OTHCMP PJSM BEFORE M/U LUBRICATOR. 22:15 - 22:30 0.25 DHB P OTHCMP M/U LUBRICATOR. 22:30 - 23:00 0.50 DHB P OTHCMP PRESSURE-TEST LUBRICATOR AGAINST MASTERVALVE/SSV TO 3,500PSI. 23:00 - 23.15 0.25 DHB P OTHCMP INSTALL BPV. 23:15 - 23.45 0.50 DHB P OTHCMP PU VVITH RUNNING TOOL. CLOSE MASTER. PRESSURE TEST TO 3500 PSI. GOOD TEST. CLOSE SSV,LEAK TEST GOOD. 23:45 - 00:00 0.25 DHB P OTHCMP RD LUBRICATOR 10/9/2011 00:00 - 00:30 0.50 DHB P OTHCMP MOVE LUBRICATOR OFF OF RIG FLOOR. CLEAR AND CLEAN RIG FLOOR. 00:30 - 01:00 0.50 RIGD P POST STAB INJECTOR OVER WELL TEST QTS. CHECK VALVE ALIGNMENTS. SIMOPS OF NITROGEN CREW PREPPING FOR BLOWDOWN. 01:00 - 01:00 0.00 RIGD P POST RUN NOZZLE DOWN TO SWAB VALVE. PUMP FRESH WATER THROUGH COIL. 01:00 - 03:00 2.00 RIGD N WSEQ POST SLB N2 CREW DETECT THAT CHARGE-PUMP IS UNFUNCTIONAL AND NEED TO CHANGE OUT N2 TRUCK. WAIT FOR NEW N2-TRUCK TO ARRIVE ON LOCATION. 03:00 - 03:45 0.75 RIGD P POST SLB N2-TRUCK BACK ON LOCATION AND RIGGING UP. MEANWHILE PUMP 13BBLS CORROSION INHIBITOR,FOLLOWED BY 1OBBLS METHANOL THORUGH COIL. 03:45 - 04:00 0.25 RIGD P POST PJSM ON BLOWDOWN. 04:00 - 04:30 0.50 RIGD P POST PRESSURE-TEST LINES TO 3,500PSI,BLOW DOWN REEL AND CLEAR STACK WITH NITROGEN. 04:30 - 06:30 2.00 RIGD P POST UNSTAB COIL INJECTOR.INSTALL GRAPPLE AND PULLTEST-OK. 06:30 - 08:30 2.00 RIGD P POST RUN COIL END TO REEL&SECURE. 08:30 - 10:30 2.00 RIGD P POST INSTALL CLAMP TO SECURE COIL TO SHIPPING BAR CLEAR BOMB BAY DOOR BEFORE OPENING START SWAPPING BOP'S TO 2-3/8" 10:30 - 10:45 0.25 RIGD P POST PJSM TO REMOVE AND INSTALL REELS 10:45 - 12:30 1.75 RIGD P POST UNSTAB REEL DRIVE PLATES TO LOWER REEL 11:20 REEL UNLOADED 12:30 - 12:45 0.25 RIGD P POST REEL SWAP COMPLETED,PERFORM AAR FOR REEL SWAP 12:45 - 13.00 0.25 RIGD P POST PJSM TO RD INJECTOR Printed 10/17/2011 1 48.16PM North America -ALASKA- BP Page 13 of 13 Operation Summary Report Common Well Name: H-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:9/8/2011 End Date: X3-010G9-C: (1,184,473 00) Project:Prudhoe Bay Site: PB H Pad I Rig Name/No.: NORDIC 1 Rig Contractor:NORDIC CALISTA Spud Date/Time:8/19/1971 12:00:00AM Rig Release: 10/9/2011 UWI:500292010400 Active Datum:6:04 8/19/1971 00:00 @64.40ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 14:00 1.00 RIGD P POST RD INJECTOR-REMOVE GOOSENECK AND PACK-OFF 14:00 - 16:00 2.00 RIGD P POST STOP RD INJECTOR TO ND BOPE AND SUCK OUT PITS 16:00 - 18:00 2.00 RIGD P POST PRESSURE TEST TREE CAP 18:00 - RIGD P POST RIG RELEASED Printed 10/17/2011 1:48:16PM H-04B, Well History (Post Rig Sidetrack) Date Summary 11/01/11 WELL SHUT IN ON ARRIVAL. TAGGED TOP OF DEPLOYMENT SLEEVE AT 10,697' SLM W/3.75" LIB(CLEAN PICTURE). TAGGED INNER DEPLOYMENT SLEEVE AT 10,703' SLM W/2.50" LIB (CLEAN PICTURE). RDMO DUE TO WEATHER, RETURN TO OPERATOR. 11/02/11 SET BAKER 45 KB LINER TOP PACKER AT 10,681' MD (4" G FISH NECK/OAL 18.38'). SET IN DEPLOYMENT SLV@ 10,702 SLM. GOOD SET, RDFN. (.4 11/03/11 T/I/O=0/0/0 Temp=S1 Assist Slickline, MIT-T FAILED to 2400 psi, CMIT-TxIA FAILED to 2400 psi. (Post CTD) Loaded Tbg with 5 bbls of neat and 39 bbls of 70°F crude. Slickline set plug. Pumped 5.3 bbls of 50°F crude down Tbg to reach test pressure for CMIT-TxIA. Tbg lost 82 psi and IA gained 10 psi in the 1st 15 min. In the 2nd 15 min Tbg lost 49 psi and the IA gained 6 psi. In the 3rd 15 min the Tbg lost 38 psi and the IA gained 3 psi for a total Tbg pressure loss of 169 psi and an IA gain of 19 psi in a 45 min test. Slickline performed MIT-IA PASSED to 2400 psi with a tri-plex. Bled back to Final W HP's=0/0/0. Slickline on well and has control. Annulus valves open to gauges. 11/03/11 LRS LOADED TUBING W/30 BBLS CRUDE. SET LINER TOP TEST PLUG (4-1/2" CAT STANDING VALVE W/3" SEALS) @ 10,675' SLM. LRS ATTEMPTED THREE MIT-T TESTS (TBG COMMUNICATING W/IA). SLB PERFORMED MIT-IA W/TRIPLEX TO 2400psi (PASSED). LRS PERFORMED CMIT-TxIA; PRESSURES SHOWED STABILIZATION. PULLED LINER TOP TEST PLUG BACK OUT OF LINER TOP PKR @ 10,675' SLM. WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS. Page 1 of 1 MINI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB H Pad H-04 500292010400 H-04B Survey: MWD Survey Report - Geographic 03 October, 2011 Midi0 b BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-04 Project: Prudhoe Bay TVD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Site: PB H Pad MD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Well: H-04 North Reference: True Wellbore: H-04B Survey Calculation Method: Minimum Curvature Design: H-04B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB H Pad,TR-11-13 Site Position: Northing: 5,957,572.25 ft Latitude: 70°17'30.055 N From: Map Easting: 641,366.07 ft Longitude: 148°51'19.802 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.08° Well H-04 API No. 500292010400 Well Position +N/-S 0.00 ft Northing: 5,959,915.00 ft Latitude: 70°17'52.731 N +El-W 0.00 ft Easting: 643,315.00 ft Longitude: 148°50'21.712 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore H-04B API No 500292010402 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°) (°) (nT) BGGM2011 9/1/2011 21 34 80.99 57,660 Design H-04B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,350.00 ' Vertical Section: Depth From(TVD) +N/-S +El-W Direction Ift) (ft) IN (°I 2140 0.00 0.00 60.62 Survey Program Date: 10/3/2011 l i From To (ft) (ft) Survey(Wellbore) Tool Name Description 143.10 11,350.00 Gyrodata Gyro(H-04A) GYD-CT-CMS Gyrodata cont.casing m/s 11,351.80 14,589.00 MWD(H-04B) MWD MWD-Standard 10/3/2011 11:29:01AM Page 2 COMPASS 2003.16 Build 73 r0 E R� b BAKER HUGHES Survey Report Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-04 Project Prudhoe Bay TVD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Site: PB H Pad MD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Well: H-04 North Reference: True Wellbore: H-04B Survey Calculation Method: Minimum Curvature Design: H-04B Database: EDM.16-ANC Prod-WI-124P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,350.00 34.12 117.78 8,643.96 2,792.23 5,131.72 5,962,804.37 648,392.15 70°18'20.175 N 148°47 52.066 W TIP 11,351.80 34.34 118.15 8,645.45 2,791.76 5,132.61 5,962,803.91 648,393.05 70°18'20.170 N 148°47 52.040 W KOP 11,379.89 35.72 127.78 8,668.47 2,782.99 5,146.09 5,962,795.40 648,406.69 70°18'20.084 N 148°47'51.647 W 11,409.85 31.66 138.10 8,693.41 2,771.76 5,158.27 5,962,784.41 648,419.08 70°18'19.973 N 148°47'51.293 W , 11,439.87 34.69 148.03 8,718.55 2,758.64 5,168.06 5,962,771.48 648,429.12 70°18'19.844 N 148°47'51.007 W 11,469.73 35.24 157.27 8,743.04 2,743.48 5,175.90 5,962,756.47 648,437.24 70°18'19.695 N 148°47'50.779 W 11,503.97 40.16 166.72 8,770.15 2,723.59 5,182.26 5,962,736.71 648,443.98 70°18'19.499 N 148°47'50.594 W 11,532.21 45.24 167.77 8,790.89 2,704.92 5,186.48 5,962,718.12 648,448.56 70°18'19.316 N 148°47'50.471 W 11,559.47 48.86 165.99 8,809.47 2,685.49 5,191.02 5,962,698.78 648,453.46 70°18'19.125 N 148°47'50.339 W 11,611.93 52.89 156.33 8,842.61 2,647.10 5,204.22 5,962,660.65 648,467.40 70°18'18.747 N 148°47'49.955 W 11,637.29 54.54 152.60 8,857.62 2,628.66 5,213.04 5,962,642.39 648,476.56 70°18'18.565 N 148°47'49.698 W 11,664.99 58.22 148.77 8,872.96 2,608.56 5,224.34 5,962,622.51 648,488.24 70°18'18.368 N 148°47'49.369 W 11,694.59 62.21 145.11 8,887.66 2,587.05 5,238.36 5,962,601.27 648,502.67 70°18'18.156 N 148°47'48.961 W 11,729.89 67.19 140.22 8,902.75 2,561.71 5,257.72 5,962,576.31 648,522.51 70°18'17.907 N 148°47'48.397 W 11,764.99 72.16 142.12 8,914.94 2,536.08 5,278.35 5,962,551.07 648,543.62 70°18'17.654 N 148°47'47.796 W 11,795.11 76.22 148.45 8,923.15 2,512.26 5,294.82 5,962,527.58 648,560.55 70°18'17.420 N 148°47'47.316 W 11,824.43 79.54 153.94 8,929.31 2,487.15 5,308.62 5,962,502.74 648,574.82 70°18'17.173 N 148°47'46.914 W 11,854.47 83.61 159.23 8,933.72 2,459.90 5,320.42 5,962,475.72 648,587.13 70°18'16.905 N 148°47'46.571 W 11,884.85 86.26 165.83 8,936.40 2,431.05 5,329.49 5,962,447.05 648,596.76 70°18'16.621 N 148°47'46.307 W 11,914.57 88.19 172.19 8,937.84 2,401.93 5,335.15 5,962,418.04 648,602.96 70°18'16.335 N 148°47'46.142 W 11,944.49 89.08 180.26 8,938.55 2,372.10 5,337.11 5,962,388.27 648,605.50 70°18'16.041 N 148°47 46.086 W 11,980.53 88.01 181.72 8,939.47 2,336.08 5,336.49 5,962,352.24 648,605.56 70°18'15.687 N 148°47'46.104 W 12,011.81 88.62 173.61 8,940.39 2,304.87 5,337.76 5,962,321.06 648,607.43 70°18'15.380 N 148°47'46.068 W 12,044.65 89.72 164.89 8,940.87 2,272.64 5,343.88 5,962,288.96 648,614.17 70°18'15.063 N 148°47'45.890 W 12,074.51 89.23 169.38 8,941.14 2,243.54 5,350.53 5,962,259.99 648,621.36 70°18'14.777 N 148°47'45.697 W 12,105.27 90.92 176.14 8,941.10 2,213.04 5,354.40 5,962,229.57 648,625.82 70°18'14.477 N 148°47'45.585 W, 12,134.23 90.83 182.80 8,940.66 2,184.10 5,354.67 5,962,200.65 648,626.64 70°18'14.192 N 148°47'45.578 W 12,153.21 91.29 187.30 8,940.31 2,165.21 5,353.00 5,962,181.72 648,625.33 70°18'14.006 N 148°47'45.627 W 12,185.83 90.61 194.53 8,939.77 2,133.20 5,346.83 5,962,149.61 648,619.77 70°18'13.692 N 148°47'45.807 W 12,223.69 89.60 203.07 8,939.70 2,097.40 5,334.64 5,962,113.58 648,608.27 70°18'13.340 N 148°47'46.163 W 12,254.87 90.34 210.13 8,939.71 2,069.53 5,320.69 5,962,085.46 648,594.85 70°18'13.066 N 148°47'46.571 W 12,297.13 82.31 208.26 8,942.42 2,032.75 5,300.13 5,962,048.29 648,575.00 70°18'12.704 N 148°47'47.171 W 12,327.89 80.33 202.15 8,947.07 2,005.26 5,287.19 5,962,020.56 648,562.58 70°18'12.434 N 148°47'47.549 W 12,359.47 77.64 197.59 8,953.10 1,976.12 5,276.65 5,961,991.23 648,552.60 70°18'12.147 N 148°47 47.857 W 12,400.83 79.94 199.48 8,961.14 1,937.65 5,263.75 5,961,952.53 648,540.44 70°18'11.769 N 148°47'48.234 W 12,438.07 81.88 202.69 8,967.03 1,903.35 5,250.52 5,961,917.98 648,527.87 70°18'11.432 N 148°47'48.620 W 12,471.09 83.24 208.41 8,971.31 1,873.83 5,236.40 5,961,888.19 648,514.32 70°18'11.142 N 148°47'49.032 W 12,506.99 84.16 214.12 8,975.25 1,843.34 5,217.89 5,961,857.36 648,496.39 70°18'10.842 N 148°47'49.573 W 12,534.85 84.81 218.86 8,977.93 1,821.05 5,201.40 5,961,834.77 648,480.33 70°18'10.623 N 148°47'50.054 W 12,570.41 82.65 223.44 8,981.81 1,794.44 5,178.16 5,961,807.72 648,457.60 70°18'10.361 N 148°47'50.732 W 12,605.15 82.31 227.59 8,986.36 1,770.31 5,153.59 5,961,783.13 648,433.50 70°18'10.124 N 148°47'51.449 W 12,635.27 80.17 232.82 8,990.95 1,751.26 5,130.73 5,961,763.65 648,411.01 70°18'9.937 N 148°47'52.116 W 12,665.17 80.10 238.83 8,996.08 1,734.73 5,106.37 5,961,746.65 648,386.97 70°18'9.774 N 148°47'52.827 W 12,694.91 79.64 244.03 9,001.31 1,720.73 5,080.67 5,961,732.17 648,361.54 70°18'9.637 N 148°47'53.576 W 12,727.01 79.52 247.86 9,007.12 1,707.86 5,051.85 5,961,718.75 648,332.97 70°18'9.511 N 148°47'54.417 W 12,755.92 80.88 251.46 9,012.04 1,697.96 5,025.14 5,961,708.35 648,306.46 70°18'9.413 N 148°47 55.196 W 12,789.18 84.40 255.92 9,016.31 1,688.71 4,993.49 5,961,698.49 648,275.00 70°18'9.323 N 1480 47'56.119 W 12,814.84 84.07 260.74 9,018.88 1,683.55 4,968.50 5,961,692.86 648,250.11 70°18'9.272 N 148°47'56.847 W 12,845.72 84.19 265.13 9,022.04 1,679.77 4,938.02 5,961,688.50 648,219.71 70°18'9.235 N 148°47'57.736 W 12,874.72 84.78 268.95 9,024.83 1,678.28 4,909.20 5,961,686.46 648,190.93 70°18'9.221 N 148°47'58.577 W 12,906.42 85.11 273.75 9,027.63 1,679.02 4,877.64 5,961,686.60 648,159.36 70°18'9.228 N 148°47'59.497 W 12,934.86 83.98 277.60 9,030.33 1,681.82 4,849.47 5,961,688.86 648,131.15 70°18'9.256 N 148°48'0.318 W 12,969.88 84.34 283.22 9,033.90 1,688.11 4,815.22 5,961,694.50 648,096.79 70°18'9.318 N 148°48'1.316 W 10/3/2011 11:29:01AM Page 3 COMPASS 2003.16 Build 73 NM0 b BAKER HUGHES Survey Report-Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-04 Project Prudhoe Bay TVD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Site: PB H Pad MD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Well: H-04 North Reference: True Wellbore: H-04B Survey Calculation Method: Minimum Curvature Design: H-04B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 13,005.66 83.69 289.61 9,037.63 1,698.16 4,781.11 5,961,703.90 648,062.49 70°18'9.417 N 148°48'2.311 W 13,049.34 85.27 288.41 9,041.83 1,712.32 4,740.00 5,961,717.27 648,021.12 70°18'9.556 N 148°48'3.509 W 13,073.10 88.31 286.97 9,043.16 1,719.53 4,717.40 5,961,724.04 647,998.39 70°18'9.628 N 148°48'4.168 W 13,103.36 91.99 283.34 9,043.09 1,727.44 4,688.21 5,961,731.39 647,969.05 70°18'9.705 N 148°48'5.019 W 13,128.82 95.16 279.90 9,041.50 1,732.56 4,663.32 5,961,736.04 647,944.08 70°18'9.756 N 148°48'5.744 W 13,161.05 95.31 273.66 9,038.55 1,736.35 4,631.47 5,961,739.21 647,912.16 70°18'9.793 N 148°48'6.673 W 13,206.29 95.71 278.02 9,034.21 1,740.93 4,586.68 5,961,742.94 647,867.30 70°18'9.839 N 148°48'7.979 W 13,233.27 95.11 282.53 9,031.66 1,745.72 4,560.26 5,961,747.22 647,840.79 70°18'9.886 N 148°48'8.749 W 13,262.09 94.45 286.90 9,029.26 1,753.01 4,532.49 5,961,753.99 647,812.89 70°18'9.958 N 148°48'9.559 W 13,290.21 95.30 290.63 9,026.87 1,762.02 4,505.96 5,961,762.49 647,786.20 70°18'10.047 N 148°48'10.332 W 13,320.89 94.09 289.79 9,024.36 1,772.58 4,477.27 5,961,772.50 647,757.31 70°18'10.151 N 148°48'11.168 W 13,352.31 92.61 285.31 9,022.52 1,782.04 4,447.37 5,961,781.38 647,727.24 70°18'10.244 N 148°48'12.040 W 13,381.07 94.12 282.15 9,020.83 1,788.85 4,419.49 5,961,787.66 647,699.23 70°18'10.311 N 148°48'12.853 W 13,409.69 94.51 280.07 9,018.68 1,794.35 4,391.48 5,961,792.63 647,671.13 70°18'10.365 N 148°48'13.669 W 13,443.77 93.25 277.65 9,016.37 1,799.59 4,357.89 5,961,797.22 647,637.45 70°18'10.417 N 148°48'14.649 W 13,473.09 91.96 274.05 9,015.04 1,802.57 4,328.76 5,961,799.65 647,608.27 70°18'10.446 N 148°48'15.498 W 13,501.93 91.93 270.93 9,014.06 1,803.82 4,299.97 5,961,800.35 647,579.46 70°18'10.459 N 148°48'16.337 W 13,529.19 91.63 269.43 9,013.21 1,803.91 4,272.72 5,961,799.92 647,552.22 70°18'10.460 N 148°48'17.132 W 13,567.67 93.66 277.26 9,011.44 1,806.15 4,234.38 5,961,801.43 647,513.84 70°18'10.482 N 148°48'18.250 W 13,595.65 92.68 281.71 9,009.89 1,810.75 4,206.83 5,961,805.50 647,486.22 70°18'10.528 N 148°48'19.053 W 13,625.63 91.96 277.44 9,008.67 1,815.73 4,177.30 5,961,809.92 647,456.60 70°18'10.577 N 148°48'19.914 W 13,662.30 91.57 271.32 9,007.54 1,818.53 4,140.77 5,961,812.02 647,420.02 70°18'10.604 N 148°48'20.979 W . 13,691.24 93.17 268.15 9,006.35 1,818.40 4,111.86 5,961,811.34 647,391.12 70°18'10.603 N 148°48'21.822 W 13,721.34 93.29 264.43 9,004.65 1,816.45 4,081.88 5,961,808.82 647,361.19 70°18'10.584 N 148°48'22.696 W 13,751.80 91.38 260.05 9,003.41 1,812.34 4,051.73 5,961,804.14 647,331.12 70°18'10.544 N 148°48'23.575 W 13,783.48 91.32 254.66 9,002.66 1,805.41 4,020.84 5,961,796.62 647,300.37 70°18'10.476 N 148°48'24.476 W 13,812.30 91.97 250.74 9,001.83 1,796.85 3,993.34 5,961,787.53 647,273.04 70°18'10.392 N 148°48'25.278 W 13,842.34 91.04 253.25 9,001.04 1,787.57 3,964.78 5,961,777.71 647,244.67 70°18'10.301 N 148°48'26.111 W 13,871.98 88.43 257.73 9,001.18 1,780.14 3,936.10 5,961,769.74 647,216.14 70°18'10.228 N 148°48'26.947 W 13,901.50 87.94 263.17 9,002.12 1,775.25 3,907.01 5,961,764.29 647,187.15 70°18'10.180 N 148°48'27.795 W 13,936.56 87.55 271.45 9,003.50 1,773.61 3,872.05 5,961,761.98 647,152.23 70°18'10.164 N 148°48'28.815 W j 13,964.08 86.84 276.40 9,004.85 1,775.49 3,844.64 5,961,763.34 647,124.79 70°18'10.183 N 148°48'29.614 W 13,998.74 86.78 281.32 9,006.78 1,780.82 3,810.45 5,961,768.02 647,090.51 70°18'10.235 N 148°48'30.611 W 14,026.38 86.96 286.24 9,008.29 1,787.39 3,783.66 5,961,774.08 647,063.60 70°18'10.300 N 148°48'31.392 W 14,059.29 86.92 288.26 9,010.04 1,797.13 3,752.27 5,961,783.22 647,032.04 70°18'10.396 N 148°48'32.307 W 14,085.53 86.99 284.05 9,011.44 1,804.42 3,727.11 5,961,790.03 647,006.74 70°18'10.468 N 148°48'33.040 W 14,118.67 84.65 278.86 9,013.85 1,810.98 3,694.73 5,961,795.97 646,974.24 70°18'10.533 N 148°48'33.984 W 14,143.03 85.72 274.21 9,015.90 1,813.75 3,670.62 5,961,798.27 646,950.09 70°18'10.560 N 148°48'34.687 W 14,176.13 88.01 269.58 9,017.71 1,814.84 3,637.60 5,961,798.73 646,917.05 70°18'10.571 N 148°48'35.650 W 14,213.39 89.48 262.23 9,018.53 1,812.18 3,600.47 5,961,795.37 646,879.99 70°18'10.545 N 148°48'36.733 W 14,239.23 91.35 257.78 9,018.34 1,807.69 3,575.03 5,961,790.40 646,854.64 70°18'10.501 N 148°48'37.474 W 14,268.35 93.07 256.19 9,017.22 1,801.14 3,546.68 5,961,783.31 646,826.42 70°18'10.436 N 148°48'38.301 W 14,299.83 97.61 259.23 9,014.29 1,794.47 3,516.07 5,961,776.05 646,795.94 70°18'10.371 N 148°48'39.194 W 14,331.37 95.02 264.00 9,010.82 1,789.90 3,485.07 5,961,770.90 646,765.04 70°18'10.326 N 148°48'40.098 W 14,362.31 94.92 269.58 9,008.14 1,788.18 3,454.31 5,961,768.59 646,734.31 70°18'10.309 N 148°48'40.995 W 14,393.07 93.07 275.87 9,005.99 1,789.64 3,423.67 5,961,769.46 646,703.66 70°18'10.324 N 148°48'41.888 W 14,424.67 91.47 282.11 9,004.74 1,794.57 3,392.50 5,961,773.80 646,672.40 70°18'10.373 N 148°48'42.797 W 14,455.53 89.48 286.25 9,004.48 1,802.13 3,362.59 5,961,780.78 646,642.36 70°18'10.447 N 148°48'43.669 W 14,481.59 90.31 283.70 9,004.53 1,808.86 3,337.42 5,961,787.03 646,617.06 70°18'10.513 N 148°48'44.403 W 14,515.55 87.61 276.07 9,005.15 1,814.69 3,304.00 5,961,792.22 646,583.54 70°18'10.571 N 148°48'45.377 W 14,543.63 86.93 272.60 9,006.48 1,816.81 3,276.03 5,961,793.81 646,555.54 70°18'10.592 N 148°48'46.192 W 14,589.00 86.93 272.60 9,008.91 1,818.86 3,230.77 5,961,795.00 646,510.26 70°18'10.612 N 148°48'47.512 W TD-2 3/8" 10/3/2011 11:29:01AM Page 4 COMPASS 2003.16 Build 73 ri.II ,...,, b BAKER '� HUGHES Survey Report Geographic INTEQ iroNvit Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-04 Project: Prudhoe Bay TVD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Site: PB H Pad MD Reference: 6:04 8/19/1971 00:00 @ 64.40ft(generic drilling rig) Well: H-04 North Reference: True Wellbore: H-04B Survey Calculation Method: Minimum Curvature Design: H-04B Database: EDM.16-ANC Prod-WH24P Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,316.00 2,315.99 18 5/8" 18.625 20.000 10,012.00 7,624.98 9 5/8" 9.625 12.250 14,589.00 9,008.91 2 3/8" 2.378 3.000 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 11,350.00 8,643.96 2,792.23 5,131.72 TIP 11,351.80 8,645.45 2,791.76 5,132.61 KOP 14,589.00 9,008.91 1,818.86 3,230.77 TD Checked By: Approved By: Date: 10/3/2011 11:29:01AM Page 5 COMPASS 2003.16 Build 73 TREE= 6-3/8"CIW SA,WELLHEAD= MCEVOY Fi -UL+B ORIGGIINAL.4 H 04AWEL BORES NOT *** SHOWN ACTUATOR= BAKER C KB. ELEV= 64.44' I BELOW WHIPSTOCKS""" BF. ELEV= 45' KOP= 2600' O 2000' —5-1/2"CAMCO"BAL-O"SSSV Max Angle= 98°© 14300' LAND NIP, ID=4.562" Datum MD= 11649' 30"CEMENTED 100' 2244' —9-5/8"DV PKR Datum TVD= 8800'SS CONDUCTOR 2293' —13-5/8"X 9-5/8"XO, ID 8.681" 13-3/8"CSG,68#, K-55 SEAL-LOCK, — 2293' , GAS LIFT MANDRELS ID= 12.415" ST MD TVD DEV TYPE VLV LATCH PORT DATE 2 3018 3005 18 OTIS DMY RM ' 0 09/07/11 18-5/8"CSG,96.5#,K-55 BUTT, ID=17.655" — 2316' LI 1 5512 4747 54 OTIS DMY RM ' 0 09/07/11 Minimum ID = 1.78" @ 10700' I 9363' —5-1/2"OTIS X NIP, ID=4.562" STEEL BUSHING IN DEPLOYMENT SLEEVE 9415' —TBG SEAL ASSY, ID=? IIEK 9431' —9-5/8"X 5-1/2"BKR HB PKR, ID=4.00" ei 5-1/2"TBG,17#, L 80, .0232 bpf, ID=4.892" —{ 9431' 9438' —5-1/2"X 4-1/2"XO, ID=3.958" 9-5/8"X 7"TIEBACK, ID=? —1 9517' 9-5/8"X 7"LNR TOP PKR, ID=? — 9556' J. 4. 9556' 9-5/8"X 7"TW LTP&LNR HGR, ID=? — LTA = it., /-27—I2- 9-5/8"CSG,47#, N-80 SEAL-LOCK, ID=8.681" — 10012' ► Z .�s� 11- -(t /10694' —13.70"X 3.00"DEPLOY SLV, ID=3.00" TOP OF 2-3/8"LNR --I 10694' 10700' —3.00"X 2.25"DEPLOY SLV, ID=1.78" ' •• 10789' -f BKR LOCATOR SUB,ID=2.390" TOP OF 2-7/8"LNR — 10793' .!: t - 10793' —3-1/2"BKR DEPLOY SLV, ID=3.00" 3-1/2"LNR,8.81#, L-80 STL, - 11315' 0 =; BEHIND 0087 bpf, ID=2.992" 10802' —3-1/2"X NIP, ID=2.813" CEMENT 4-1/2"TBG,12.6#,L-80, .0152 bpf, ID=3.958" — —11325 i' 0r 11304' —1 HOWCO XN NIP w/RA MKR, ID=2.75" 4-1/2"WHIPSTOCK w/RA TAG @ 11332' - 11325' 41 11315' J-I3-1/2"X 3-3/16"XO, ID=2.786" •t 7"LNR,29#, N-80 SEAL-LOCK, —1 — 11325 t ►t I' .0371 bpf, ID=6.276" ►t j V t MILLOUT WINDOW(H-04A) 11325'-11333' 3-3/16"LNR,6.2#, L-80 TCII, —11352 ►' • .0076 bit, ID=2.:05" • /3-3/16"WHIPSTOCK(09/19/11) ---I 11352' ____c"\ ` &FOf�T1f�Pd SpJAAiMILLOUT WINDOW(H-04B) 11351'- 11357' , yIA�R�i REF LOG: MCNL/CCL/GR ON 101/06/11 TIE-IN LOG: GEOLOGY PDC LOG — ANGLE AT TOP PERF:96°@ 14320' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE — 1.56" 6 14320- 14490 0 10/18/11 ,� 14494' J— PBTD •i • 2-3/8"LNR,4.7#, L-80 STL, .0039 bpf, ID=1.995" - 14581' ••. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/18/77 ORIGINAL COMPLETION 10/19/11 DGD/JC FINAL DRLG CORRECTIONS WELL: H-04B 01/13/90 D-16 RWO PERMIT No:'2110850 11/28/03 NORDIC 1 CTD SIDETRACK(H-04A) API No: 50-029-20104-02 10/10/11 NORDIC 1 CTD SIDETRACK(H-04B) SEC 21,T11 N,R13E,873'FNL&1265'FEL 10/15/11 PJC DRLG DRAFT CORRECTIONS 10/17/11 MS/PJC PBTD CORRECTION BP Exploration (Alaska) rL \TTi _, _; " L , , . SEAN PARNELL,GOVERNOR ALASKA OIL ANI) GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU H-04B BP Exploration (Alaska), Inc. Permit No: 211-085 Surface Location: 873' FNL, 1265' FEL, SEC. 21, T11N, R 13E, UM Bottomhole Location: 767' FSL, 1687' FWL, SEC. 15, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Since J . . .r a - tmmissioner DATED this /iday of July, 2011. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RFCFNED ALM OIL AND GAS CONSERVATION COMM' 'ON PERMIT TO DRILL JUL 0 7 901' ,- 20 AAC 25.005 .?-/N/ 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Winj 0 Single Zone AlBiikiSiiiiiiffifiarll bilitillifsokiraiiiiiiISSien ❑ Drill IS Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed,fftEctis Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp ale Gas 2. Operator Name: 5.Bond: IS Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193 PBU H-04B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O.Box 196612,Anchorage,Alaska 99519-6612 MD 14833' ND 8955'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028284 873'FNL, 1265'FEL,SEC.21,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2034'FSL,3500'FWL, SEC. 15,T11N, R13E, UM August 1,2011 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 767'FSL, 1687'FWL,SEC. 15,T11N, R13E, UM 2560 21460' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 64.40' feet 15.Distance to Nearest Well Open Surface: x- 643315 y-5959915 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 1050' 16.Deviated Wells: Kickoff Depth: 11464 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3340 Surface: 2460 18. Casing Program: Specifications Top-Setting Depth-Bottom _ Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling_ Length _ MDTVD MD ND (including stage data) 3" 2-3/8" 4.7# L-80 STL _ 2555' _ 10700'- 8145' 14833' 8955'as`71 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 13410 9009 12450 13376 9008 None Casing Length Size Cement Volume MD ND Conductor I Structural 100' 30" 300 sx Permafrost II 100' 100' Surface 2316' 18-5/8" 4800 sx Permafrost II 2316' 2316' Intermediate 10012' 13-3/8"x 9-5/8" 740 sx'G'.200 sx'G'.2170 sx PF ll 10012' 7625" Production Liner 1805' 7" 1140 sx Class'G' 9517'-11322' 7251'-8621' Liner 2626' 3-1/2"x 3-3/16"x 2-7/8" 157 sx Class'G' 10784'-13410' 8207'-9036' Perforation Depth MD(ft): 12042'-12450' Perforation Depth ND(ft): 8952'-9050' 20.Attachments: 0 Property Plat IS BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report IS Drilling Fluid Program IS 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Mark Staudinger,564-5733 Printed Name oh., Title Engineering Team Leader Prepared By Name/Number. Signal r~• Phone 564-4711 .Date 7?//I Elizabeth Barker,564-5674 Commission Use Only Permit j''rill API Number: Permit Ap o 'al a See cover letter for Numb : 07110 Q 50-029-20104-02-00 �19 I I, I other requirements Conditions •f Approval: If box is checked,well maynot be used to explore for,test,or produce coalbed methangas hydrates,orgas contained shales: (Ij Other: it '3500 / Sv �OP -7—;5.S r p Samples Req'd: Yes liNo y Mud og Req'd: Yes IRI No i fi 2-5•0p rs L /Ir.^"'C.` /e 5 - H25 Measures: f Yes 0 No Directional Survey Req'd: Yes 0 No R 119 APP-OVED BY THE COMMISSION Date Pi3i/ �e COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 2 s rP"'+h ,r f • • oval 0 AAC 05(g)) Submit In Duplicate �� �V f , �, 7 /3•!r ofie4Of To: Alaska Oil & Gas Conservation Commission From: Mark Staudinger bp CTD Engineer Date: June 30, 2011 Re: H-04B Permit to Drill request Approval is requested for a permit to drill a CTD sidetrack from well H-04A. H-04A is a 2085' horizontal CST in Zone 2B and a RWO in February, 2009 set a CIBP and shot 25' of perfs. Production remained unchanged after the RWO. H-04A is currently shut-in for high GOR. REASON FOR SIDETRACK H-04A is no longer a competitive producer, and there are no remaining wellwork options. The proposed sidetrack will access reserves in a -30 acre target in northeastern H-pad. The well is in good mechanical condition. H-04A passed an MIT-IA to 2,500 psi on 4/17/11, passed the MIT-T to 1,500 psi on 8/28/08, and failed the MIT-OA. The OA is cemented to surface and had a LLR of .83 gpm on 9/15/03. PPPOT-T passed to 5,000 psi on 2/9/11 and failed the PPPOT-IC on 8/28/11 with a suspected primary seal leak. The tubing was callipered on 3/15/11 and showed an average wall penetrations from 20% to 42% in 66 of 231 joints. The proposed plan for well H-04B is to sidetrack out of the H-04A 3-3/16" liner with a Coiled Tubing Drilling rig on or around August 01, 2011. The existing perforations will be isolated whipstock packer pre CTD operations. The sidetrack will exit the 3-3/16" liner in Zone 4 and drill a 3.0" hole in the target zone Z2A/2B sands. Pre-Rig Work: (scheduled to begin July 10, 2011) 1. W MIT-IA to 2500 psi; MIT-OA to 1200 psi. ' 2. S Pull LTP 3. E Dummy Baker 3-3/16" PackerWS drift ✓, PSA 4. E Set Baker 3-3/16" Packer WS at 11,444' 5. W PPPOT-T to 5,000 psi, function LDS 6. F Load & Kill well. Freeze protect to 2,500' TVD. 7. V PT Tree (MV, SV, WV) P�A 8. V Set BPV - 24 hrs prior to rig arrival Rig Work: (scheduled to begin on August 1, 2011) A 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mill 2.74" window at 11,444' and 10' of rathole. Swap the well to Quick Drill-n. 3. Drill Build: 3.0" OH, 250' (22 deg/100 planned) with resistivity 4. Drill Lateral: 3.0" OH, 3080' (12 deg/100 planned) with resistivity 5. Run 2-3/8" solid liner leaving TOL at 10,700' 6. Pump primary cement leaving TOC at 11,170', 14.7 bbls of 15.8 ppg Class "G" liner cmt planned N 7. Cleanout liner and MCNL/GR/CCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions (-800'). 10. Run LTP if failed liner lap test 11. Freeze protect well, RDMO • Post-Rig Work: 1. Re-install wellhouse and FL's. 2. Kick off well with N2 3. Run Generic GLV's as needed Mud Program: • Well kill: 8.6 ppg brine. • Milling/drilling: 8.6 ppg Quik Dril-n mud for milling window and drilling. Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject at DS-04. • All Class I wastes will go to Pad 3 for disposal. Hole size: 3.0" 11,444' MD-14,825' MD Casing Program: • 2-3/8" 4.7#, L-80, STL 10,700' MD— 14,833' MD • • A minimum of 14.7 bbls 15.8 ppg Class"G"cement will be used for liner cementing. • TOC planned at 11,170 MD. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90°, inclination at KOP is 38°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—21,460 ft. • Distance to nearest well within pool—1,050'to H-14B Logging • MWD directional, Gamma Ray and resistivity will be run over all of the open hole section. • Cased hole GR/CCUMCNL logs will be run. Anti-Collision Failures • H-17 has a ctr-ctr distance of 538.12'and is currently P&A. • H-17A has a ctr-ctr distance of 432.34'and is a shut-in producer. • H-36A has a ctr-ctr distance of 136.74'and is a shut-in producer. Hazards • One mapped fault crossing at 12,000' MD. • The maximum recorded H2S level on H pad was 160 ppm on well E-102 on 5/7/2011. • The most recent H2S reading for H-04A was 14 ppm on 7/25/10 • Lost circulation risk is considered moderate for this well due to the planned fault crossing. Reservoir Pressure • The reservoir pressure on H-04B is expected to be 3,340 psi at 8,800'TVDSS. (7.3 ppq equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2460 psi. Mark Staudinger CTD Engineer 564-5733 CC: Well File Sondra Stewman/Terrie Hubble TREE= 6"CNV y WELLHEAD= MCEVOY H -04A SAFETY NOTES: C.t✓1.raw` - ACTUATOR= OTIS KB. EL,EV= 64.44' BF.BEV= 45' 2000' 5-1/2"CA MCO"BA L-0"SSSV KOP= 2600' '.' I r LAND NIP, ID=4.562" Max Angle= 95°@ 12798' --I 2244' —DV PKR Datum MD= 11617' Datum TVD= 8800'SS \ /--1 2293' H 13-5/8"X 9-5/8"XO 13-3/8"CSG,68#,K-55, ID=12.415" — 2293' I/ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 18-5/8"CSG,96#,K-55, ID=17.655° — 2316' 2 3018 2940 18 CA DMY RM ► 0 11/11/09 LI 1 5511 4677 54 CA DMY RM R 0 11/11/09 Minimum ID = 2.377" @ 12425' 9363' --15-1/2"OTIS X NIP, ID=4.562" 2-7/8" STL LNR 9415' I—ITBG SEAL ASSY 2 z 9431' —j9-5/8"X5-1/2"BKR HB PKR, ID=4.00" 5-1/2"TBG,17#,L-80, .0232 bpf,ID=4.892" — 9431' II / 9431' —5-1/2"X 4-1/2"XO TOP OF 7"LNR — 9462' I ` 9517' —TW HGR,TM/PKR W/TB — 10784' —14-1/2" KB LTP, ID=2.56" 9-5/8"CSG,47#, N-80, ID=8.681" H 10012' 10789' —BKR LOCATOR SUB, fD=2.390" TOP OF 2-7/8"LNRH 10793' (10790'cnl) ; 10793' H3-1/2"BKR DEPLOY SLV, ID=3.00" �; ► 10802' —13-1/2"X NIP, ID=2.813" �; j� 11270' TUBING PUNCH IN STRADDLE 3-1/2"LNR,8.81#, L-80 STL, — 11315' � I. 11304' (11301' cnl) HOWCO XN NIP .0087 bpf, ID=2.992" �� • w/RA MARKER, ID=2.75" 01 •,* 11315'J—3-1/2"X 3-3/16"XO, ID=2.786" I TOP OF WHIPSTOCK H 11325' i 14 , 4,,,,,,, RA PIP TAG —I 11332' •,1,� ` MILLOUT WINDOW(H-04A) 11325'- 11333' MARKER JOINT — 11510' • RADIOACTIVE COLLAR -111675'elm I-- 3 12406' —13-3/16"X 2-7/8 XO, ID=2.441" 4-1/2"TBG,12.6#,L-80, .0152 bpf, ID=3.958" — 11740' = S ` 12450' H2-7/8"CIBP(02/01/09) I 7"LNR,26#,N-80,SEALLOCK, — 12008' �'�'..'.'.'.' // .0371 bpf, ID=6.184" 4.4..� ������AA ` / PERFORATION SUMMARY i' REF LOG:MCNL/CCL/GR ON 11/27/03 3-3/16"LNR, 6.2#, L-80 TCII, --I 12406' ��1kI, - TIE-IN LOG: GEOLOGY PDC LOG .0076 bpf, ID=2.80" "" ANGLE AT TOP PERF:76"@ 12042' .,`,. Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 12042- 12067 0 02/02/09 2-7/8"LNR,6.16#, L-80 STL,.0058 bpf, ID=2.377" H 13410' 2" 6 12306- 12356 O 09/19/06 2" 6 12490- 12560 C 09/19/06 2" 4 13030- 13150 C 11/27/03 2" 4 13180- 13296 C 11/27/03 2" 4 13320- 13360 C 11/27/03 DATE REV BY COMMENTS - DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/18/77 ORIGINAL COMPLETION 02/06/09 GLM/SV SET CIBP/ADPERF(02/02/09) WELL: H-04A 01/13/90 RWO 03/27/09 JLJ/PJC GLV C/O(03/21/09) pc-MIT No: 2031610 11/28/03 TMN/TLP CTD SIDETRACK 09/09/09 CJN/TLH GLV C/O(07/30&08/04/09) AR No: 50-029-20104-01 05/29/06 CO/DTM I'cHF CORRECTION(6/13/2004) 11/14/09 DAV/PJC GLV C/O(11/11/09) SEC 21,T11N, R13E,872.91'FNL&1265'FEL 06/26/08 PJC LNR CORRECTIONS 07/29/10 JKD/PJC CIBP SET(02/01/09) 10/16/08 JNA/PJC GLV C/O(09/12/08) I BP Exploration(Alaska) TREE= 6"CM/ H -O 4 B SAF. .OTES: WELLHEAD= MCEVOY ACTUATOR= OTIS Proposed CTD Sidetrack KB.ELEV= 64.44' BF.ELEV= 45' 2000' —5-112"CAMCO"BA L-0"SSSV KOP= 2600' O j LAND NIP,ID=4.567' Max Angle= 95°@ 12798' --I 2244' I—IDV PKR Datum MD= 11617' Datum TVD= 8800'SS \ — I 2293' --I 13-5/8"X 9-5/8"XO I 13-3/8"CSG,68#, K-55, ID=12.415" I-I 2293' GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 18-5/8"CSG,96#, K-55, ID=17.655" — 2316' 2 3018 2940 18 CA DMY RM 0 11/11/09 LI 1 5511 4677 54 CA DMY RM ' 0 11/11/09 Minimum ID =2.377" @ 12425' ' 9363' —I5-1/2' OT1S X NIP,ID=4.562" 2-7/8" STL LNR -- 9415' —ITBG SEAL ASSY I z Z. 9431' —I9-5/8"X 5-1/2"BKR HB PKR,ID=4.00" 5-1/2"TBG,17#,L-80,.0232 bpf,ID=4.892" —I 9431' \ 9431' —15-1/2"X 4-1/2"XO TOP OF 7"LNR —I 9462' 9517' I—ITM'HGR,TW PKR W/TB 1 3.7" deployment sleeve /4.5" KB LTP 9-5/8"CSG,47#,N-80,ID=8.681" H 10012' --A k i K TSGR 11,170' K TOO below 11,170' if possible 2-3/8" 4.7# L-80 liner t • IN •,, 3-3/16 pkr whipstock @ 11,444' 14,833' - TD 38 degrees 3 3 4-1/2"TBG,12.6#,L-80, .0152 bpf, ID=3.958" 11740' '' .' `, fl Gt eP 7"LNR,264,N-80,SEALLOCK, 12008' '..•'.�.'.'.�.'. .0371 bpf,ID=6.184" 001 ...4............. \est PERFORATION SUMMARY 3-3/16"LNR, 6.2#,L-80 TCII, — 12406' I REF LOG:MCNL/CCL/GR ON 11/27/03 .0076 bpf, ID=2.80" mikTIE-IN LOG: GEOLOGY PDC LOG ��. "* ANGLE A T TOP PERF:76`@12042' Note:Refer to Production DB for historical pert data 12406' —13-3/16"X 2-7/8 XO,ID=2.441" SIZE SPF INTERVAL . Opn/Sqz DATE 2" 6 12042-12067 0 02/02/09 2-7/8"LNR,6.16#,L-80 STL,.0058 bpf,ID=2.377" 13410' 2" 6 12306-12356 0 09/19/06 2" 6 12490-12560 C 09/19/06 2" 4 13030-13150 C 11/27/03 2" 4 13180-13296 C 11/27/03 2" 4 13320-13360 C 11/27/03 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/18/77 ORIGINAL COMPLETION 02/06/09 GLM/SV SET CIBP/ADPERF(02/02/09) WELL: H-04A 01/13/90 RWO 03/27/09 JLJ/PJC GLV C/O(03/21/09) PERMIT No: 2031610 11/28/03 TMNITLP CTD SIDETRACK 09/09/09 CJN/TLH GLV C/O(07/30&08/04/09) API No: 50-029-20104-01 05/29/06 CO/DTM PERF CORRECTION(6/13/2004) 11/14/09 DAV/PJC GLV C/O(11/11/09) SEC 21,T11 N,R13E,872.91'FNL&1265'FEL 06/26/08 PJC LNR CORRECTIONS 07/29/10 JKD/PJC CIBP SET(02/01/09) 10/16/08 JNA/PJC GLV C/O(09/12/08) BP Exploration(Alaska) a _a 0 0- 03 1 V♦ ItL Q Q 1 al C U L la E 1- Ill H .0 0 mc1 ca V L t p1= p -a = g � 01101Z c `� aa a CO N 0 Z = i giw N z 4 C•3 Qa i1 . m zCO O) Lr) N o M N 0 CO 0Ooi a O ci a. N O oO csi U M n O N a) n °O o) C a0 Q a) O GD n a o) n , Z Ci O. O CCOO N 2 C © 3 0 T a O U U N O `) O co o c a 2 0 > O) 2 Z > U o a) Z > N l m Q ( a) 0 . O in a`O E cD in 3 rn 2 m o M c or a hi v 13 v a) d .. 2 p etiy .N .N c « .� 0 2 m F- f w 2 7 7 C) •a, O O y J J 0 a) > . D 7 O ei ao co C L CO a C R O n a) t J J 0 .0 U) w d 0) C « F aO ClC Ue - CN •• E ' Ca) C 7 _ O O C U aU . lL o O' a) w a) •• ❑ C N C w y a) U a E V O o o O a) > D V. CL) N. 0 'V o O U ❑ O N N 0 00 d "" ,o ❑ O 7 co >` N c0 C = = 0 c� J I•- 2L Z ti ❑ L0 M O O O W n r O O c) Ln V Lc) O O) CO 00 0 U) O) M (E 0 LO •01. rn CO0 .& CL a N la a .0 QI— 0 d o Oc o Q. O H w o m + CO m N a) lV a a> r a) CO U w N N LC re O) A C a C_ n O C a) 0 O a3 t L 'ft.'s. Z w c) C > =, C o Z coo 3 ., hp a) Z - o 0 ❑+ o Z Q J CL } O Q y N CO id. w ❑ <ac O a) a) > G `cu F 0 J O a) O. C O coO` w M a ,°, a a „ v cn a a ti a x x c ca x p - O O O Cl w 0 o 0 0 ❑ 1 n Z o 0 0 0 CO N p O a N g .- � o 9 o a) 0 v d 2 A 2 Q L c Q O m Z 2 � ? m o o Ti; m m CO a � N o a 0. 2 2 o a E d m u) p N O CO m Z w L -LO0 = v m c 2 Z Q + + o 2 CO o o al >, Zaa = in. c c a II y c r o 11011 W c v c v . LF) 'uNS IMCNI ❑ a i, C .. ai N O C •a) C o C 2 V O C V) d N u O C T co O O o O O O N C Z O Ti e= W .. a m 4,0 N ❑ N o E : aEt a c m v o CO F o .2 -. m d d 2 o w m «« °= o o 'm m o a) R v = a`12) w rn Z 0 a in 3 3 r 0. 2 C..1 f co cn IL a 3 3 0. 3 2 C a > > N co (b O m O O O 0 O 0) N O U) 00 0) 0 INU O CO 0 0 O 0) N n N N U) j . /^ M N n V V co In V U) U) m [ii)0 rn V ^ CO c m o LL 0 a F` N U co C Q m 0) Co 0) N- 0) CO CD 0) O N N 0 a O (D 0 0 co m a co N- N- 0 N n O U) O O d U) N- N 0 N- d' U) O) 0 I` N- co 0) 0) 0 V V co co CO 0 O V d U) U) U) U) U) CO (O CO (0 c0 (D CO CO CO 0 a N N (n (n � (n (n (n (n # (A (n to N (n (n (0 • 2 CO = 0 O -o 0 0 0 O j d o ^ m U o v o O 0 0 0 o co o O o O O a0i0 Z o 0 0 0 o O O O o O 0 o O a U Q M �o a) co E o �x 2 d o c v E J o m o 2 E 0 G e .e co F- W co O co 0) 0) IN 0 U) 7 N U) 0 O N- 0) V 0 N co U) 0 CO IN CO M 0 N- V 0 of N 0) 0) N (O U) W N- O_ y M co V' U) U) co 0) 0) 7 7 n CO 0) O .O 01 7 V 7 V a 'U a a U) U) U) U) U) CO C 0 CW c0 W o005 co 00 0 0 0 co 00 0 00 t v a v v v v v v v v v c v v w N .n (0 CD CO 0 CO (0 (0 (0 CO (D CO CO CCD CO r W c y . 0 c ui C1 m 9 O C07 y 0) M CO CO co a IN V Co n M (0 (V C C (� Co N R 'V' O O V O t` N M CO O) ` w A 7 V M M N U) co n V CO Co M V N O w w CO 0 N E N- (D U) M M 0) CO 0 0) CO 0 U) n C� N a' >, (a O C N N r- N N- CO (0 (0 U) 0 U) V V C.1 N Ce a. . al d C N N N N N N N CV N N N (V N CV- pZi 0 0 0 7 c (Np -0 lr' - rn T O) 00) CT) CM00) m CO CD CO CO CO 00) CO 3 rl 2 fo G (? o ui ui tri Ui ui U) co (ri Ui Ui ). Ui u5 co- E; oC '0N Z CU c C C N 1/'�� Q_ a CO Cn M O CO O O1 0 CO M O U) N CO N CL W c 0 p O U) U) O C. .- CO ,- 7 U) CO N CO O H O` O) 0 M 0 r Oi CO (D 0 m O T > 0 a0 W 0) M M 0 O N N 4 a o 0 N N N N N M M M CO C cc N 0 U) U) U) U) U) U) U) U) U) U) U) U) N m w r Q I- 13. o CL V CO CL co M N CO CO M IN O 0 M CO CO U) N- CO m 0 00 N M O 7 N 0) M O co 7 M co O O C)1 r M M Q) r N 0 CO ChN y CO U) V N CO U) U) IN r Q1 M 01 0 E U r- r t` CO CO CO U) 0 4 V M M m Z to N N N N N N N N N N N N N N a O p o Z I- (..9 2 n V co 0) Co r N N- CO U) 4' M 7 V M U) W U) CO U) M M N N IN co O U) O r O V U) (D M N O) co U) (0 0) 0) M U) co OV co N- N- CO CO CO CD (D CO n IN I` CO co CO CO CO Co co eo Co 00 0 00 oc (o ao ((i (o (0 00 c 00 N G r Q (O V 7 0 CV 0 N- 0 CO U) V N 0 O O O (0 0 ,- O CO 00 M N 0) 0 N n n n n (o (D U) U) O 0 xt oy T m Q C d r V 11; O m N 2 O >w @ d O c COev C CO CV 7 T N VN. N- N-. N. 0 CO r '4 0 O CD N 7 CO O d U) Co V Co N- 0 N- CO 0 o CO r- 0 CA U) U) N M M M 7 U) W Q N O M V M V 7 V U) U) U) CO CO IN N- I` CO @ Uj C' O T CI N M CO O v CO C v CO v (um a F 0 Qoa m0 0 r -0 2 v a c o o 2 m 0 0 CO E Z o d 2 2 d ` 0 0 O O O of o O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 o O o 0 0 0 a . O V N T U) V V 0) 0) O 0) 0) O O 0) O 0) O V p W - a) N V 0 0) o U) 0) O O O O U) 0 V 11/011 Z v v c o v U (n (n co rN m eo n n VI c o co o - a - p - c = iv \I go G .. d F' LL1:1 _' F Y W V U) CO P a0 0) 4 d o o c >, a) m H E o 3 d y 'w Z I rn Z coy a` rn 3 3 o co a CO CO Ch a/� ( • O) O CO M N O N O f` O M O M N O N ss ! CO CO 'a N O O CO O O) O 0) O) O M D ,� 0. n n n 0 0 O O) 0) CO 0) CO N S p) co CO co co co co co O O (P co O. ,.J 0) CO 0) CO CO( CO CO CO D0 Cfl C A o 1- MO "O 1- O CO U N U 0 C Q O 1 O co CA V 1` O co O co O N e- CO N CO CO V a V m m V V .- N- N M (O CO 1� ,- V CO s- N O CO CO V O N- CO N M 7 CO CO CO m N- O CO N O MCOQ O r N- CD 7 O) M 0 O N- CO m CO N. N. N- N- N- CO CO C) 7 0 CO CO CO CO CO O CO 7 M CO N N 0 0 O) 0) co n U NI-. N y ui CO 9- COCOCi (n CO (ri CO) CO Lc; Lc; COC ) ici CO) CO.; Y . v q CO I CA x 0 o -o o m o 0 z a cu> z 7 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 1 Z o O 0 0 0 0 O O O o 0 0 0 0 o O o 0 0 0 J ' 0 < N N N N N N N N N N N N N N N N N N N N ▪ 0 � r r r r r r .- r r - - - r - - - - r r N r O 0 CO c a d O J N m o 7 C 2 p O 2c0H � W CO M O CO co M co O CO N O) CO CO CO N N CO N CO CO q' CO n V CO O O CO eC N O 4 _ _ CO M N CO n CO O N CO N N _N CO M4 n a CO O N M M y N M M M 0 O M m N V N M N M N CO M M U 'O O) CO CO CO CO CO O CO V V R M CO N N ,- - 0 0 0) c0 C 0C _ 00 CO CO co- (O CO co- CO co- CO CO co CO CO co- CO CO CO N- n `I L V 7 7 7 v V V V V 7 V V' a 'V 7 V v V V w d CO ' CO CO CO (O CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO W A v K W C N co C d • V R Cp U U ` 3 CO N 7 CO N n 0 0) CO I,- N03 CO 7 CO N M N C C U O CO N- N 7 CO CO V 0 N. V O CO CO 7 CO CO O) M M 9 i ` 0 d ,-w w R 0) O CO N- co CO 0) O CO O CO CO M CO r O .Cd., a) V N N N CO 0 CO 0 0) CO CO M M N N V a CO r () N rt T A 0) M N N <- 0 0) O) CO CO N \ n n N N- N - N r N 11 N L C d a .0 CCOO CO 'C.; CO m CO CO CO CO CO CO CO CD CO CO CO CO CO CO CO CO u p p o 3 R •C (n C) rn rn 0 O) o) 0) 0) 0) 0) 0) 0) 0 Cr) 0) 0 0) 0 0) J I- 2 Z CO I=1 0 CO CO) CO CO CO CO CO CO CO CO C1) CO CO CO CO CO CO CO CO CO Z t Q. CO CO N CO CO CO N CO CO N CO CO O) O) N- CO O CY a) O) - co CO V V 0 O O N - M - O CO e- 7 N CO O Ct O CO CO h n CO CO N M M CO M M CD M N- O N M M CO CO co CO N n CO • V M CO V CO 7 CO 7 7 M CO O Q. () M co co co co N N N .- .- 0 O C) 0) CO CO n 1- CO O N C 4Z CO. CO CO CO CO CO CO CO O CO. O O V 7 V V V V V V < H D. 'o aU CO CL O M CO M CO CO CO CO N. C) CO N- M V O M CO CO CO O (P W (O V 7 7 M N f` CO m M co O r O m M V M V 0) N N • CO N- V N • • 0) 0) CO C C O) N 0 N 0 0 0 N 0) V 0) CO CO 7 N N M .7 CO CO O CO N N O O O W n N- n n N. n N N N N ,- .- .- r .- .- 1- ,- .- .- ,- ,- ,- .- 0. N Z -. CO V O V 1- CO N V 0 V CO O) N- CO 0 N CO O 00 O 7 CO N CO O N M CA M O N N- N I,- a O CO N O n CO CO O) CO CO N CO M V N N N CO N CO O) (3) O) 0) O) 0) CA 0 O N N M CO .7 7 V CO CO CO CO CO CD CO CO CO O) CT D) O) 0) CO 0) 0) O) 0) m 0) Ca CO CO CO CO 06 COCO CO CO 06 COCO CO CO CO CO CO CO CO CO CO CO Ca p x CO N V' M N O CO CO CO CO O CO CO Cr) Cr) 7 V N CO • Cr) V a V V O O N CO V N- O) N- () t` CO O M 4 CO CO (P M O O (O n O N M 7 CO W CA CD CO n CI) 0 N N N)M M O CO CO N- N- CO CO N- CD .- A- A- N N N N N N N N N N N N NN N N N Q 0- CO O O N N N N- r 0 N N- N- CO CD N N M M O O) N C) J CO O .- CD c-• r 0 CO N- r CO CO O 0 r A- N N N. O Q V cO CO CO O) O) O N V V 7 er CO CO CO O CO CO CO CO CO co co co co co O) co co CO CO co CO co CO CO CO CO CO co CO U >. O Cy N C E m -D Q L d m O O 2 m o o 03 Z 0 a I 2 d O 0 0 0 0 0 N O N O N O N O N O O N 0 0 Z O O 1111 a O O O O M O M O CO O M O M O O CO O O03 T O CA O O O O W O W O M O M O M O O CO O O O 1. NI 0 O O O O O co O co O n O m O O O O O O NI O 0 O .- N M 4 7 O O CO CO 1� N. CO CO 0) O O ,- N N N N N N N N N N N N N N N N N M M M M �YI� 5.C N � = c � `- co 4 � In 40 S- N '�= W 0. d C N m E.y C O r W N N R Q�j Z o n. to Ti o 0. N _ _.. _.__.____ O ►r CO CI 0 0) L- 0 0) 0 0 o 0) N. o 0 0 CO N- CD 0 0) ao o 0 co o 0 0) 0) o 0) 0) 0) 0 0 CO 0) 0) o 0) CO C. O m of O of of of O of of ai O O of 6 of O ai rn N. C0) (O m CO CO 9) DO aD a) CO CO 0: `ii T a) a) CO CO m 9) w OD CO O co0 c v , a LL -- C') 'O ~ CDN CO U C Q co N. Cr) LO N V M CD U) co CO V N 7 01 M 01 W CO V Q. CD O V O LO LO N. (D N CO CO n 4- OO Cr) N. CO LO CO CO Cl M N Cr) 0) 0) N N 0) M M (O N V co O) 0) 7 r D) O O O N CO 0) N 0) O 0 (O O O (O 0 O 0 O O N N V d N- CD LO LC) V V CO N N 0 0 0) CO CO N- CO co Lf) a co N 0 N m -f ,T Y Y Y Y a c q Y c•) Ci Ci C) M Ci Ci M Ci r) co i N F a 0 o -o o E o O a 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CA co Z o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J U < N N N N N N N N N N N N N N N N N N N N N N • ) ,- 4- a- a- e- c- .- .- a- a- N- a- a- a- N- N- 1- A- N- al O in 3-, = - 01 7 _ c O E J 0 >0) y 0 C Q o 7 2 CO H rL W •••• CO n N_ Li) O CO LO 0) 0 CO N _N O LC) U) N. N LO V N. CO O CO O 7 (D N V M O) N O CO n CO N O CO O Lf) m O 7 O N.: O O 00 (O N N D) M V LO 6 V LO O N n n N co M co co co co co O 7 7 O) a 7 LD V CO LO LO LC) L() LO CD U 9 O) N r CO LO 0 V CO Cr) N .- 0 0 O CO CO n CO LO LO 7 M N CO c n N- n N T n N N n N N- n (D (O (O O O O (O O (O (O t v v v c v v v v v v v v v v v v v v v v a v 44'N W •0 CO CO CO CO CD CO CD CO (O CD CO CO CD CD CO CD CO CO CD (0 C.C. CD W Ce c O c m � 2 ti y C V N O O O) M M co co N. V N V O co W n O LD L!) N O d C () N n V (b .- (D CO r V co co co O CO O N a) CO (D CO 9 0 w 0 N co M M O M O O CO W co .-- O CO 0) O O N V LO O w LyLu 0 N co LO co co Co r O V N N N CO N V Cl LO LO (O LO N ✓ d .,- ct 10 O) NN. n n r n n N- N. h r N- N- CD CO CD CO CO CO CO (0 CO a, .c 0 a A +O-. t O O O (D O O O O (O 7, O O (O CD O (O (D (O (D (O (O CO O 0 O 7 R L' = 0) W m 0) W 0) 0) CO 0) CO 0) 0) CO O) CO a1 CO 0) 0) 01 0) O J 1- s Z N G O N 6 LO it; ui 6 6 tri Ln u-i Lfi Ln Ln co LL7 LA LA Lfi tri U7 Ln Ln Z t Q V V co co N CO LO 0 N CD N- N CO N. r LO O CO V Cl 0 a/ 0 CO LO N- CO CO CD 0) 0 V 0) h'._.., N Cr) a- O N n CO 0 O V M O LO V V O O (O N N V CO N N Cr; O LO CO a1 co LO lO co LO co to N (O CO O CO n (D n n r r n N CL ✓ 7 Cl N N .- 0 O O) CO CO N. CD LO LO 7 M N N - Co. CO CL C 24 V V' K V 7 7 7 V M M M M M M M co M M M M M N Cn D W Ma .o W a O co M M M co CO LO M N. 0) 0) U) n M a- LO V <7 o Ca .- M W O M CO N CO O) O M CO O O CO N O 7 ll') N n N CO M O) V lO W O V n (D CO (O n O CO 7 N a N CO LO LO L) M M COM N CO N. N. (O L0) O1 CD CO N N. CO CO LO 0 n n N. r N I- n n N N. N. CO CO CO (O CO CO CO CO (O 0 y CO a- a- a z x M CD (O T N N. N N. LO CO V N Cr) M V V' M M 0) (D V t co N- OD 0) CNC') V LO (O N. 00 0) 0 O N Cr) Cr) Cr; C') C' ) Cr) 7 d' 7 7 7 V V C V 7 O Ln U) LA Ln LO LO IC) Ln Ln Ln Ln LO LO Ln LO CO LO LO LO LO Ln LO LO LO LO LO 0) O) 0) O) 0) 0) 01 0) 0) 0) 0) 0) 0) 0) CO 0) O) 01 0) 0) 0) 0) N w Co 0 0 0 0 Oo Ou 0 a5 U) U) U) U Do U) U) 0 U) U G E co co CO CO CD CO CO OO CD CD CD CD CO CD CO CO CD CD CD OO CD CD M M LO LO LO LO LO LO n 0) 0) N- M LO LO LO 0) Cr) M M O) M LO C) 0i N- 6 O) CO O) N- (D N.: 0) Ni C) N O W Ln co N- CO h. CD LO LO LO N- r CO U) d' V LO T CO CO N. CO 7 N N N N N N N N N N N N N N N N N N N N N N Q C- a. m co O O N N N Cl M M Cr) V d' V LO LO LO LO CO CO DI 0) 0 0) 01 01 a 0) 0) 0) 01 CO CO O 0) 0) 0) 0) 0) 0) 0) 0) Q 0) O) Q1 m 0) O O O) 0) 0) M 01 O O) C) O) O) O) 0) D1 0) 0) N CO CO co W W W co W co co co CO co O a0 co co W co co co as U >,. O — .c..- co C C E m 0 Q .c 0_ (0 LO O m O O C W Z D- 0. 12 0- N O O N O 0 O N 0 O N 0 O N 0 O 0 O N 0 O O Z 11/ M O O Cr) O 0 O M O O M O O Cl 0 0 0 O M O 0 O Q. >. W O O N6 O O C) O O C) O O C) O6 O O C) O O O L' • ilea Z co O o CO O o O co O O V 0 O co o O O O O 0 0 O r•-:ea N M V V N N m CT N- N M LO LO CO CO O a- C LO CO N.. CO in M M M M M M M M M M CO' V 4. 4' C V' V V 7 7 V 7 `W >, N N in - ,. - - e- co ,- - e- e- a- a- .- N a- a- a- N a- a- .- .-- N N r wo S= a c , .. a c_o c o m E a y 0 0 w R cv..... Z ci a` co 0 a CO n t j O) W CO on an V O 0 c m LL COO j O N CO CCCL an 01 CL COco Q N 2 to E 0 -o 2 2 a m Z 7) U O co W E 0)E 2 a) O E J N co 3 C a Q O 1 M I h- 6 M C L C V W _ 2 w CZ C 2 ..., O C d C 'O O 0 3 O C y O 4 w R d ' m dU R CcoW t a 11 ,- 74 > O3- m r - rn J F- 2 Z co 0 Z ui W 0. 0) N r -a- 0. < H I a •o CL U m a O I COco a o) m zz -- w N O O 0) ca cc;N O x co M 7 V N Q a CO 1 CO J 01 Q ai coo co Um a U .•. N co O C CO E a M Q O aO N C a 2 v m o 2 m o 6 co M Z a a 2 2 a Cy CO 0. CO CO CO 111 la T CO O 1�rig= Z ; CO a ' m C) U) C L ro O CD M O N N OO 0 �_ d O O Mco O COr) 7 r Lri W NI a 7 .� [O GOCo CO Er) i- n N C -a- co 7 7 7 V 0) O aD WCO C J sr OO sr ,_ GD sr ,_ OO sr OO Q 1 2 sr a 0 4 N z z z z z z z co = g V COCD NI COcO N to co c O OO M N.: N O p N O 7 2° Co •- e- O 3 a _ Eo Eo Co Co 00 > 0 0 0 0 0 O 0 o to -7 E cD _ = — C o o E o 0 0 0 0 O O O o 0 0 0 0 0 0 0 0 0 C. O O N 03 > C Q co O O co O O O O O O O O co O O co O Co O O O 2 co H f W cri Lao 0 0 o u) N- coa co (' 6 0 0 o ui o 0 o a co M CO CO CO CO V M CO_ V 00 c0 M N N N M N. O CO CO O N O) Ni CO CO CO O) O CO LO CO N CO Cr) Cr) N- C- COCO Cfl CO C- Co CO (O N- C• Cr) Cr) N- co" O W 1- OO W ✓ v v v v - v v v v v v v v v a v v v v v - co co co co co co co co co (O co O Co (D (o CO (D CO CO CO CO CO a) w U v C O 0) L a) ). a' 2 O C O O 0 O C) O O O O O O O O O O O O O O O O OO O O O O O O O O O O O O O O O O O O O O CC U 0) ! OO O O O O lO C) O CO O ON- O O V O O O CON. CO O O O O O O co coWOCAOOO NM 4 0 C7 CO Cn Cl. M M Co N- CO_ O CrCO CO O O O c• .- N- O U) O C C w V 0)• CD ODDOtD O O N O (O O O O N N N N N D CO CO CO CO O NI (D VNUN LO O O O co O OO O O O O CO O O O O O O CO O >. a C = uLU cn cn LU ui i LU L6i ui i LU L( L6LU LU LU LU cn LU : re -c 0) O > 0 0 7 711Z J 1- 2 Z co o SZ r- co N- CO N O N N O OD V V V CO V CA V CO O N O f N-N- r- O CD O .- O O o N O Co (0 CO O CO O CO CO O 00 O O C. V CO O C) ui C' Cr) 6 C) N Ni N` M M6 a. V O co O V CO CO Cn CO o O M M Cf) d' CA 7 CO O N M CO (O O CO O CA W CO CO n r CO CO O N CD N O CO M y a a 7 M N M N 7 N N N V V N N a CO CO CO srCr) CO < H + LL UV Cr) 1- CO M co Co O O) co co co O co O co co CO d 7 7 CO CO 0 N V O O CO CO N- N N N V CO a N O 0 N N 7 W 7 7 N O O4 CO CO 1r) Cr) W CA O6 O N co N. Ca CO O W O CO CI) CO V CO V W V V O N O W O W N. N N- CO CO Cn M CA M M CO O n CO co u7 (O W O O O O .- ,- co V s.c5 c) Z O r Lu -W .- (o .- e- .- N N- N r N N N s- N 1j) N co OM co a • co n 0 O O Cr) WV N N O Vz a) co co CO co N N Cr) O O 0 0 0 co Z O Z co OO co co co co 7 000000 OZ 0 O O O o O O u) O O M O coO O O O o O O O O o O O C') O O o o O Cr) )- ca 8 O O O O O , O O O O O O (p N n W U3 LU Osr 7 O O O CO r c0 O) O 0 Cb Co W N- 0 0 OD -1- O O 1 H 0 Q H H 0 N- > co co V H N N H co co co cr) co CD N N CO O O W v.) N co co Cr) co Cn V co` 0 O co O W O 0 CD O 0 co co O O O v O v O O 2 O V O O c o 2 2 W M a_ r cg- ( cv aD cv o ca co M co M co a (D a coO co co co n nm v m io � Y o oao o � o o � CD o@ o o � c;=- 0 (0 oo@ oo CO w O O O O O N O O Q p) N N co N CO Q C N O Osr Q ° co M V W co LU a > T >, > Tc .co T so cu 5" d d d 5 r) E m a C C C C C C Q o a co O U 0 U U a) U L -O 2 7 c N .) N N N o o 2 co O O o 2' O O O of m zaa = ia co co co m co Z . 16 E' • N CO •7 co 0) to 0) co N M V N M V CA (O to (0 coco 1' W r N N c C C C C Cfl co O) CO y C C C C C y C C C C C C C Ctn N C. °J E °� E °o 'E O7 E o 0 0 0 E. _ '� o 0 0 5 0 0 5 a E_ a) cP IMI IMG E h cc oo)ao ao cc- ao oc m a m a a a a o a a a a a a m o) C ` O a (0 c >. co c C o C C o C 0 o c >. co C C o Ingo o ti _ o c m Ez t m aa_ m aa_ m ao_ m ao_ m ad m aao co o a �, �,= y o 0 0 0 0 0 o N H •-• :: d N 7y7 (a to O Z U• d of 0 H I- I 2 I I I I I CD a • a m . C) c cvj O O 0 _ U N 8coco o) = O v a U N CO = a O O -O N � tea`O y 0 z Z J3 < V CO 41 O fZ E co = E ) a aa)- o 2 'c 0 W U .a C O W .c 2 o a) 2 O O O O C m O N O NiV y O C d N O O U N _, x 0 v e C d TO O O 4'c) d U N d a o O 0 :°R O 3 ``O' coNc(c) c7 J I- C 2 Z co O m rn N O C a 0 c re n a) O a m m 18 CO aI- 0- o a. 0 ma 00 c0 w m rn a of N U) E z z N -a- Ni c•) O N O co N C) O CO co Q po _ _ W W 2 ✓ m N CO CO o_ Or) O) CO. N M N O LO N O .0 Lo co Lo Q •U p N co TO ; 0 N N. o J co Q W U_ > .o O O N N 9 •O O CO o m L O N c7 co EO D U N O' M O coo d (Si O O 9 9 co E' f 0 2 m Z a` a = = a ca a M o o co 1� W w « r; gb E c rn Llha an W c c 0 ._ �0 c .. � o �= 0 a O c as o m a CO N CI E . .0.• 1 1A .N Z oo a` CO • 30 c) N �. CO Q a_ C CO (0 0 .C ri 43 o U N C 0) m OC O U v a N O O -O O N O O j a c.. Z N 3 C 63U . 03 o U oo o o 0 a) coo c 2 5 2 co H wW o 46 co a, o r w m ce C c do c ui c m e O tv 0 O c c ) 0 m ir2 0 ai w V H m IX re t 0 a :° ti J 1- 2 Z coo C I- co Q a E Cl) 1- J O a O O N Ca U Ccn cci CL co CO CO co a) C)) a C) E a -°o i 101 – Al 8 ry Ix - a N' O $ r ZCO •• I ocom` D Q F __ O 5 4 en -05- 0 1y -F _ h �° �' _.m v o F I y _-4 kiN v 4\ Sg . 1 Et 2 co 11 $ x , h § I o Eto a v 08 '< _ ___---___— 8 + ,n 00 '.I O t O [I] - O �, D m v_v1 • r va ,2� 2 — — h 4s .?:off _ .^ .__. _.___ .—__— .._..—__ _-m. _.-..__.. --____ N W11§ co > 1 m U . OO : M Q g N ' • N . �+ m g 1 M• N $ x \ -_ O ax vo = and g o O .s 2 .. .... .. Y 6S cg NgNgeooc ooeo 0' NI m NNNNNN0O b tn CNI O P , e 4gOS ) +)4uom/(-)gnoS o 3 1' U IC-5 4 U g i s go" g .. - Y •= a a_ o ow< s e Am N \ 5 Y 4 3,3., X0��3$84g g',''8m�08330�038 _ e QI N , 8g 1888888888588888888588 .- 2- ix 7t ,��66s �ms�ssggmgogosie 8 aaxxx y _ ai 8�S88SS8S88888888888888 .. N ,7, o m ,,v,..,v,.,,� c,J,,,,,,,,,,,,,,i r aJ ONaa $ g JN _ 'o 1 ; x ° ;�„voi u°go m $!.,�qn(,v m P m=**8�-o h 1 - O . 7 7,7i T,moi m�i[S uS ,cif y°,' p 4 O7-A LAn m C 1 'N 6 d 3r ?g''@000WIta � gi r NN ' c .„ cSuimr43 � �a � Ass � 3off _ _ _ 0 FS pN t vvvv ,o QQ NN \ _ o h ZN �! V I I / P 8 I s�,�D,<�8�8r��S"��"Ri si �i'�`B. .� . / �rP'f<�v� t�nm�8i�g���m��mm�� r 5 O p p 66 28888888858"" MP4gP4 Aj$t P g '^ 8 ,O/1 N - P .,, A 158 _..8v"38v........- —.. ..a Y�V a0 b CO 00 8 8 8 8 O: &A O, N < rn m !LOAF' 4.6 3$ �,1,. e.n.,m= �7- g174ginuij gL)tpdau leo9ua anal, U1 illMIN= 1 Ewe m = w ■ , .,',6* 111111111111111111.1Li'z ■ ■■■■■ 111111111111111111111.11 , i)084. 1� ■■■e ■� tn 8 -- a " 00 ■■■I■■' c� 0 0 al m ■■■e■■■1 _ i■■■■_■■■t - 14 8a" 5oa' x _ ~ a 1 "g E y 11111111111111111111 , 3 �d ■■■■■zca I w',7,'S.1 1 i ',.66 1 : l 1hrI :Mil — 19 9 IgIgl o I - I _ 1 ■■ a , i my N ., yO o xe = Q _N W , ,-,, I ,til , . ii, -. I 4 1:;-- J =� .1, Q V ^ z • al ^ I ' J M . — y L it 31244 la I MI f .,.:iill g W 2 3 O w VIII _.- _t•••tn0 tn a 4 lit,' .__;,:i;__1?-r- s pfkok.,. _ • 5 -1-11 . hoc '. N ao a ■ ■■L11 , N N laillkilli M N N N N O b 641 111 �,tI SD i I" ,.. 0 i I N f`l- Lom. b _ �N <- - PO = O OP .8 ‘. N N N N (uEPJ S6)(+)4u0NA-Alnos i N W E Mime >RaSgaS<'n'?�$�$m� ggpF11, gba = W $a$$ � as$$ssr.$$$$$$$$$$$ Ca F. 7r V,c1" .a ssxax,:18E8pE Z €� ,.$$$$$ $$$mup$$$$$, y `fmnammii! Jsssdsies$ ;silisicssiifMssIsssiss g 71 a li $$ ilfli 3iiN[ i iii $. Y - '9iq $ .4.0 ;MziS yffp6q6 pggy£prnityl59Is2gif3y333i33333!,1p/A1a”AlI Iydq n �m$' rmiry��, � m___ nnnna mm a e o 3-.,�VImnn<- aN4.nry $ iniliarmmimiim086 oNEm s.il �NLL fFd n nrm mmy IVI 2o sworn,mn7.szL .—, aa$ o grBill ZN 2pF %$s$ $R P,np4gW i gg 2Ehi s1Ra pool �' _�Mdmmnmm � d�mnmmo_�� i?! I o $ g o --________r 0 0 0A_ / —U LLZ � \ •8i4 2 'm. Z m 1P22' Nr P'/O ./ 11 . , :26 \ %\\\:: U\\ 0 - , %- ��� ttly...7„ \ of o 0 0..._0 o 0 o C !CO CO . V co ^6). , N m •V. c to i- c0 co ..� o L9zz she kV01111110� °zs_ 4. tii ,j'1iiiiii,,,, m„ �i�iI. „.///II/ , _ci__.0 4,i, /// aa”Ertl 6.T- C \� BS,ZC \\ \ - �� Q taiga a 844 2 //0: N \ -assN 0 : 5 --Cr i N N • L " Y 1 t 'I `s g� u mi w a 88 a` C a 5 '' g. LLd gg — a. c f S 14=1 u 1 1 ° ►•' g K i I 1I 41 i f r. 1 I p:j; 1 1 a..-1416 y • 11NN-111341 1 ;° re K Q a u .1 o m I 11 . 1 1 1 J a 1 111 11 Z � — ; - c� ... 111 u 11 u Q ' �s (I I Z U U' P .; > W : 4 illig 1 J V 'p V. 1 1 O 11 U U U 111=101= U 1ler . .., „ ,.„, ■ r Ier _ 11aoaW 111 :I WF 1 ce I m X11 � E • 9;O t011 i1 I ' e U r- 1 O 110111 A — ig il I /11111I— mmm I (n 1 F> Q 1 dt 1 5 U 1 I U_ 1 • LL g 1 11 O m I Il u z 1 6 I 111 g ! I 1 � � 111 1/ 11'"11__ m y I I III 111110 14 imminiiiiirw:3 A 1 11 I. I.. . II ii I 11 11 ,,. 0 :10 101 X11am 11 1 a 111=1�� . i T Alaska Department of Natural Resources Land Administration System Page 1 of 1 : Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources I find Alaska DNR Case Summary File Type: ADL File Number: 28284 #Printable Case File Summary See Township,Range,Section and Acreage? Yes No ( New Search LAS Menu I Case Abstract!Case Detail I Land Abstract File: ADL 28284 Map Search for Status Plat Updates As of 07/11/2011 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN:LAND MANAGER-ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location:DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction:AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 15 Section Acres:640 Search Plats Meridian: U Township: Ol1N Range: 013E Section: 16 Section Acres:640 Meridian: U Township: OLIN Range: 013E Section: 21 Section Acres:640 Meridian: U Township: 011N Range: 013E Section: 22 Section Acres:640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-95 T11N-R13E-UM 15,16,21,22 2560.00 End of Case Summary Last updated on 07/11/2011. Not sure who to contact?Have a question about DNR?Visit the Public Information Center. Report technical problems with this page to the Webmaster. Site optimized for Netscape 7, IE 6 or above. This site also requires that all COOKIES must be accepted. State of Alaska Natural Resources LAS Home Copyright Privacy System Status http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2 82 8... 7/1 1/2011 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME }"/ 24'2! PTD# aI>p�s0 ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: .04,Y POOL: ,,e�/,04,i1a 2i,44 Circle Appropriate Letter I Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after(Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name)must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 0 -0 o (a 0 -0 3 o rn O Cr) • o co Cl) r' m ( , r 30 ; ;, o m o n N D) N N .- 7 O 3: 7 O co O CD O CD .... CD co co co co Co Co Co CO co co IV N tJ fJ N N N N N N . . . . . . -s -, CO co J C) 01 A co N.) -s --s 0 `7 (0 co J (S) Ol A co N — 0 (0 Co J C) 01 A Co N — O (0 co C) 01 A co N — O --4 m O (n CO0 - K v1 * 0 W Oo 0 > -, D 0 0 0 0 (n 0 -0 D * 0 m m o 0 -, co 2 * * c r m Z ? n O 0 CD CD N CD Cp 7 p p 7 d o p1 n v c O = N m m O n c 7 N m O /� CD 7 0) -0 ° O = • tD m () a. 7 (D m 7 CD CD m �: m m m N Cr °1 3 a 7( x m m < .o .o -I -I - co n -o — 3 3 _ _ _ m 3 o f' < c n m 3. -O ... N (mn co_ m m (� m c (D c (Q r2 < < O c (D O ((DD -- N N CO O O O m -- (/�. • O_ n C) 7 m -O (n .7 N Q N _ O O CD O Vl n n A O O m (� (� O m 7 7 m 7 C) N (mn 7 G) n = N ' n c N D = CD N n N N O o C- �1 3 N N d _ Cu co co < c CD N X 7 -• O d o ° m .-. 7 7 7' O N CD CD Fp" = 3 7 5 a N co Q N O O N O m (Q' < m m N. N m 7 °- Q' CJ Q N 7 O C1 n n Q �1 • r- Tl CD `< (D co o i O S "O N tl7 7 N 17 .O 7 n = * m CD m N '< N (p 'O 'O �. p71 CCD N O O m 7- 7 CD O N O_ 2 n 5' `< Cn CD O N (� p0j N N N (Q(05 CD -- S 73 CNn (Nn '7O N Cn 73 73 tll 3 73 3 Vl D n O 0 7 c ^^ N �. o O BC) °- N -sCD n _ (D CD 3 73 n A 7 'O c c O Q m m CD O- m .0 m o _ co.., Z S g CD 0 co 0 _03 N N On N A -9 o O O n <O O 3 D) 3 a a -0 o ° < n n -.`. 7 0 n O 0 O • n o N 7 n o m co v ° m o (o m 3 m o m °' ? m' (' co m n n°i w n -' -' -s -0 -° ( ^ pl a 7 a1 3 Z 3 2 - C .. ° e "O .0 Vl -Ooo (° 'm �. CO m ° .0 3' c °- C SU Q S 3 (1' Q 7 7 -O c CD (n D 3 m * ai = m 3 m c 3 ° < o v m m 7 0 0 o Q ° ° ° 3 < Q 3 v m m 3 0' m 3 0 CO n o 5' m m o o D c N m x v ° ° Q D� m o m 7 CO o C1 a m- o o ° 7.•,!, N 0 0. 2 7 m D cn o D (n N ' m s m 0 0 7 fp 3 m (n m 3 a a 3 3 w D O O O O (n CD 'O d <. o 7 O C�<D co �T N m — — 3 7 (D 7 -N. m (O O O-0c chm co m 7' ° C -O Cp N (1 5' m O n c 0 d m m Q' y c D a w ° 1 m 3 Q° o o a p m m c o n D ',..11 En c d �0 ° '^o b O °" m 'o — O m m 7 -o ,N•. Vl Q rir cCD 3 0 7 m 7: 07 N a NN N m Q vA (o' 7 c 7 c m c 2 ED- N o o cn N N �. m v is) O 3 • O 3 m 3 a v <. F ° < 7 w m O m01 O F 3 m m o O — O � 70 4t O 7 Cn „G c A)7 0 T O m 7 z O O m mCD CO3 7 — ° () 7 S7 cn Ai FD.- O V1 1 Z Z Z Z Z Z -< -< -< -< -< -< Z -< -< -< -< -< Z Z Z Z Z Z Z -< -< -< -< -< -< -< -< -< -< -< -< Z Z N > > > > o D m m m m m m D m m m m m D D D D D D D m m m m m m m m m m m m D D ` En 01 Cn Cn (n (n V1 V1 Cr) Cn En N Cn 7 (n CO 01 01 V1 N CI) CO cn O 0 - m <cn _ a m 2 K K * -0 C) cn cn O CO (N„ Z C) XNo cn X m O 3 a �` 4 7 j o Q 0 m 77 o .D ? j m m c N Co n 7c' 3 = O < 7 ° Co - CO .a 7 .n. N coOCc) CD o 0 Z o m 3 n '< -o' m m ) 3 n coW m 3 CC)) I -o m 0. 0 7 N 0 N 0 V/ N V1 'O co co O co m N O O O b o n n 7 `< D co cnv 3 (� a (D 7 _3 CC' CO uii mo co 1 co C co CO 73 (o 2 n m 3' F m A * 3 0 m 2 3 A () Om N 03 O - 7- N CO c o 0 0 a m y �• A 7 D co D D rn in _ . -a 2 a — m D a -< (7 o N o J N p C 7 m -o Q Ca W O N m C ✓ 3 cn o n D m m n -i N Co '0 • O (3 N O HUt CD N N n 7 N (n ° 7 Q 13 C) W N m N N C71 N — O • _. c. m S 3 (n a Co O (O CA 3 0 3 (° 7 3 O 0 n c m 0 Fri O 7 D 7 m c — vQ 0 0m . m 0o co 0 Vl m I ❑