Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout182-176STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations. shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4, Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Dnll Number. 182-176 3. Address: P.O. Box 196612 Anchorage, 1 AK 99519-6612 1 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20850-00-00 7. Property Designation (Lease Number): ADL 028310 8. Well Name and Number. PBU B-21 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10200 feet Plugs measured 9700 feet true vertical 9403 feet Junk measured None feet OCT G 3 20 Effective Depth: measured 9700 feet Packer measured 8867, 9048 feet true vertical 8926 feet Packer true vertical 8137, 8309 feet AOG/`•/' Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Conductor 80 20" x 30" 39-119 39-119 Surface 2651 13-3/8" 39-2690 39-2690 5380 2670 Intermediate 9323 9-5/8" 36-9359 36-8602 6870 4760 Production Liner 1095 T 9105-10200 8362-9403 7240/8160 5410/7020 Perforation Depth: Measured depth: 9573-9760 feet True vertical depth: 8805-8983 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 5-1/2" 17#, 13Cr85 33-9186 33 - 8439 4-1/2" HES TNT Perm Packer 8867 8137 Packers and SSSV (type, measured and 5-1/2" Baker SAB Packer 9048 8309 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-MCf Water -Bbl Casing Pressure Tubing Pressure Pnor to well operation: 242 8135 4069 1994 869 Subsequent to operation: 252 19524 6436 1950 1042 14. Attachments (required per 20 PAC 25.070,25.071,&25.283) 15. Well Class afterwork: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigrephic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify, that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Glasheen, Brian P Contact Name: Glasheen Brian P Authorized Title: Produ n ao ii Contact Email: Brian.Glasheenabp.com Authorized Signature: Date: �%rf ar�- Contact Phone: +1 907 564 5905 Forth 10-404 Revised 04/2017 t� ��/p p, 'ZS riQ 'MMS -OP OCT 2 5 2019 Submit Original Only ED Daily Report of Well Operations PBU B-21 CCTIVITVnCTF ........... ***WELL S/I ON ARRIVAL*** RIG UP E -LINE AND BEGIN PERFORATING PASS 9/27/2019 ***JOB CONTINUED ON 28 -SEP -19 WSR*** ***CONTINUED FROM 27 -SEP -19 WSR*** PERFORATE 9,571' - 9,581' ELMD (REFERENCE LOG DEPTHS: 9573'- 9583') WITH 10'x 2-7/8", 6 SPF, 60 DEG PHASING M RCE GUNS. 9/28/2019 ***JOB COMPLETE. WELL SHUT IN ON DEPARTURE.*** TREE = 4-1/16" QW DATE REV BY COMMENTS DATE REV BY COMMENTS 12/16182 AUDI#2 ORKNNAL COMPLETION 07/26/18 KP/JMD TREE C/O (07Q1118) 06/13f11 WES RWO 0422/19 W/JMD ADPERF(04/19/19) 0626/11 JERI PJC FINAL DRLG CORRECTIONS 08!13/19 T5/JMD ADPERFS 08/08/19 0822/11 SWC/ PJC GLV C/O (0820/11) 10/03/19 BTN/JMD ADPERFS 0928/19) 1202/15 SWC/JMD GLV C/O IIM0/15 11106/17 CJNIJMD GLV C/O 10/31/17 PRUDHOE BAY UNIT WELL B-21 PERMIT No: i 821760 APINo: 50-029-20850-00 BP Exploration (Alaska) LATE '31/17 '31/17 '06/11 '06111 06/11 06/11 06/11 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WF1 1 naFOATlnldC Form 10-404 Revised 04/2017 ,,e 1-1 B DM S(*L✓ L SEP 0 4 2p19 Submit Original Only 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program -❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc Class Before Work �4.Well velopment 0 Exploratory ❑AK 5. Permitto Drill Number: 182-1763. Address: P.O. Box 198612 Anchorage, 6. API Number: 50.029-20850-00-00 99519-6612 dtigraphic ❑ Service ❑ 7. Property Designation (Lease Number): ADL 028310 8. Well Name and Number: PBU 8-27 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11- Present Well Condition Summary: Total Depth: measured 10200 feet Plugs measured 9700 Leet true vertical 9403 feet Junk measured None feel Effective Depth: measured 9700 feet Packer measured 8867, 9048 feet true vertical 8926 feet Packer true vertical 8137, 8309 few Casing: Length. Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 39-119 39-119 Surface 2651 13-3/8" 39-2690 39-2690 5380 2670 Intermediate 9323 9-5/8" 36-9359 36-8602 6870 4760 Production Liner 1095 T' 9105-10200 8362-9403 7240 / 8160 5410/7020 Perforation Depth: Measured depth: 9583-9760 feet True vertical depth: 8814-8983 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 5-1/2" 17#, 13Cr85 33-9186 33-8439 Packers and SSSV (type, measured and 4-1/2" HES TNT Perm Packer 8867 8137 true vertical depth) 5-1/2" Baker SAB Packer 9048 8309 No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure. 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 242 8136 4069 1994 869 Subsequent to operation: No Test Available 50 900 14. Attachments: (requi.d 0er20 MC 25 070,25.071. a 25283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Glasheen, Brian P Contact Name: Glasheen, Brian P Authorized Title: Production Engin Contact Email: Bran.Glasheen(e)bp.com Authorized Signature: - - - Date: 7 Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/2017 ,,e 1-1 B DM S(*L✓ L SEP 0 4 2p19 Submit Original Only Daily Report of Well Operations PBU B-21 ***WELL SHUT IN ON ARRIVAL*** PERFORATE 9583'-9588' WITH 2-7/8" MAXFORCE HMX, 6 SPF, 60 DEG PHASING. TIE-IN LOG SLB RST SIGMA 28 -APR -10. 2' CORRECTION FROM REFERNCE LOG. 8/8/2019 ***JOB COMPLETE*** TREE = 4-1/16' CNV V1Al MFAD=W , LV = 79.8' EV -=44.25' 4425' DMy 3200' n9k = 36' � 5700' �= 9&52' 13-3/8" DV PKR 2607' - ND= 880(y Ss x-3/8" CSG, 72#, L80 BUTT D= 12.347" 2690' Minimum ID = 3.725" @ 9137' 4-1/2" OTIS XN NIPPLE 41/2" TBG, 12.6#, 13CR-85 VAMTOP, 8967- L01 52 967'.0152 bpf, D= 3.958' 5-1/2' Tl�[NG STUB (05/27/11) 8976' 5-1/2' TBG -PC, 17#, L-80 BUTT, 9042' [232 bpf, ID = 4.892° TOPOF T LN2 9106' 4112' TBG, 12.6#, L-80 BUTT. 9180' .0152 bpf, D= 3.958" L7" LNR 26#, L-80 U4S XO TO L-80 BUTT �nnun. PBTD 10132' ID = 6 276- B-2 SAFETY NOTES:" 4-1/2" CHROME TBG 14-1/2- HES X NP, D = 3.813" GAS LIFT MAN IM c 7 3528 3515 18 MNG DMy R< 0 6 5262 5026 33 MNG ow R< 0 5 6455 6001 35 MMG DMy RK 0 4 7402 6795 30 MMG DW W 0 3 8059 7380 24 MMG OW R< 0 2 8509 7799 20 MMG DMI' R< 0 1 8753 8029 19 MNG DW R< 0 -1y OM- X 4-1/2" HES TNT PKR D = 4-1/2' HES X NP, D = 3.813" 9-5/8" X 5-1/2" UNIQUE OV E SFO 6102SBR SEAL ASSY 9-5/8" X 5-1/2- BKR SAB PKR, D = 4-12" OTIS X NP. D = 3.813" 412" OTM XN NP, D = 3.725" 4-1/2" TTL BKRSOS 9180' 4-12" 1114_CG. D = 3.858' 9781' aMD TT LOGGED ON 77n7m 7" MARKER JOiJT PRUDHOE BAY UNIT YELL: B-21 PERMR No: 1821760 APINo: 50-029-20850-00 BP Expbmtion (Alaska) BA ER GHES 0 PRINT DISTRIBUTION LIST F�U aGEcompan. COMPANY BP Exploration Alaska Inc. WELL NAME B-21 FIELD Prudhoe Bay Unit COUNTY PRUDHOE BAY BHI DISTRICT Alaska AUTHORIZED BY Paul Canizares EMAIL Paul. Can izarest(abhge.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX] PERSON ATTENTION V _ ___.... q IBP North Slope. 'LOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchorage, Alaska 99508 2 :ConocoPhillips Alaska Inc. (Attn: Ricky Elgarico TATO 3-344 1700 G Street Anchorage, AK 99501 3 iii ExxonMob6, Alaska Attn: Lynda M. Yaskell and/or Lisa Boggs 3201 C Street, Suite 505 'Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5DNR -Division of Oil &Gas "' Attn: Garret Brown 550 West 7th Avenue, Suite 1100 'Anchorage, Alaska 99501 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. .Anchorage, Alaska 99508 :Attn: Gerardo Cedilla TOTALS FOR THIS PAGE: 1021 75 30 90 5 Ise sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, 1-112-1 I E. Benson Blvd. :horage, Alaska 99508 or AKGDMINTERNAL@bp.com LOG TYPE RPM:PNC3D LOG DATE April 19, 2019 TODAYS DATE June 17, 2019 Revision No Details: Rev. Requested by: --- 1] K] KECE►VED AOGCC 0 1 4 0 0 FINAL FINAL PRELIM IIFIELDI LOGS ICD/DVD ([as, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 1] K] KECE►VED AOGCC 0 1 4 0 0 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ''❑ Suspend 11 Perforate m Other Stimulate ❑ Alter Casing 11 Change Approved Program b Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ® Stratigraphic ❑ Exploratory ❑ Service ❑ 5. Permit to Drill Number. 182-176 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 1 6. API Number: 50-029-20850-00-00 7. Property Designation (Lease Number): ADL 028310 :::Well Plugs Name and Number. PBU 8-21 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11, Present Well Condition Summary: 9700 feet measured Total Depth: measured 10200 feet Plugs true vertical 9403 feet Junk Effective Depth: measured 9700 feet Packer true vertical 8926 feet Packer Casing: Length: Size: MD Structural 9700 feet measured Conductor 80 20" x 30" 39-119 Surface 2651 13-3/8" 39-2690 Intermediate 9323 9-5/8" 36-9359 Production 50 1000 14. Attachments. (required Par 20 MC 25.070.25 o71, s 25.283) Daily Report of Well Operations ® Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR Liner 1095 7" 9105-10200 Perforation Depth: Measured depth: 9588-9760 feet True vertical depth: 8819-8983 feet measured 9700 feet measured None feet measured 8867, 9042 feet true vertical 8137. 8303 feet IITAI�:11M. 39-119 39-2690 36-8602 8362-9403 4930 6870 7240/8160 Collapse: 2670 4760 5410/7020 Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# x 5-1/2" 17#, 13Cr85 33-9180 33-8433 Water -Bbl 4-1/2" HES TNT Perm Packer 8867 8137 Packers and SSSV (type, measured and 5-1/2" Baker SAB Packer 9042 8303 true vertical depth) No SSSV Installed No Test Available 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 242 8136 4069 1994 869 Subsequent to operation: No Test Available 50 1000 14. Attachments. (required Par 20 MC 25.070.25 o71, s 25.283) Daily Report of Well Operations ® Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR 15. Well Class after work: Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 18. Well Status after work: Oil 51 Gas ❑ WDSPL ❑ ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA Authorized Name: Glasheen, Brian P Contact Name: Glasheen, Brian P Authorized Title: Production Engineer Contact Email: Brian.Glasheenabp.com Authorized Signature: tf Date: 5 I' ' Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/2017 ///!!! 11 1/ me�'o � 4BDMS' ����///�]��( V. AY 1 0 20190 �r0""'' Submit Original Only PBU B-21 04/18/2019 WSR*** (perforating) N BAKER RPM LOGGING SIGMA, C/O PASSES & BORAX LOG W/ LRS ASSIST AS PER =ORATE 9586'- 9591' WITH 2.75" 6SPF 60PHASE HSC W/MILLENIUM HMX CHARGES STOP 9573.1'. CCL TO TOP SHOT = 12.9. CORRALATED TO SLB RST SIGMA LOG 4-28- . 2' CORRECTION FROM REFERENCE LOG (PERFORATED 9588' - 9593'). ,B COMPLETE. WELL LEFT S/I*** TREE= 4-1/16' C1W VYt3LHEAD= MCEVOY ACTUATOR= CIVVSH30DO KB. EEEV = 79.8' BE. ELEV = 44.25' KOP= 3200' Max Angle = 36' @ 5700' Datum ANGLE ATTOP PERF: DaW RK M)= 9652' �13-3/8" Dv WR -3/e" DV WR -i m ND= 8800' SS 13-3/8" CSG, 720, L80 BUTT, D = 12.347" Minimum ID = 3.725" @ 9137' 4-1/2" OTIS XN NIPPLE rpf, D= 3.958" 5-12" TUBWG STUB (0527H 1) 8876' 5-12" TBG -FC, 17#, L-80 BUFF, 9042' 0232 bpf, D = 4.892- 7' LNR 26#, L-80 U4S XO TO L-80 BUTT H 10080- 7" LW 26#, L-00 BUTT, .0383 bpf, D = B-21 SAFETY NOTES: — 4-12" CHROME TBG 7 2217' 4-1/Y HES X NP, D = 3913" GAS LFT MANDRELS ST .0152 bpf, D=3.95W ND DEV 9-5/8" CSG, 47#, L-80 BUTT, D = 6.881" 9E69' VLV PERFORATDN SUMMARY PORE DYTE REF LOG: DA-BHCA, 12M 1182 3515 18 ANGLE ATTOP PERF: _' @ 9588' RK Note: Refer b PmductIon DB br Nsbical rfdata S12E SPF WTERVAL OprVSqz I DATE 2.114' 6 9588-9593 0 04/19/19 33)l" 4 9610-9612 O 07/11/94 33)8" 6 9615-9623 O 07/30/95 33/8' 6 9627-9635 O 07/30/95 34)8' 4 9628-9670 S 02/05/92 33/8" 4 9640-9650 O 07/11/94 33)8" 4 9660-9670 S 07108194 33/8' 4 9680 - 9730 S 0718)84 3-1)8" 4 9700-9760 S 02105/92 7' LNR 26#, L-80 U4S XO TO L-80 BUTT H 10080- 7" LW 26#, L-00 BUTT, .0383 bpf, D = B-21 SAFETY NOTES: — 4-12" CHROME TBG 7 2217' 4-1/Y HES X NP, D = 3913" GAS LFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORE DYTE 7 3528 3515 18 MAG DMY RK 0 10/31/17 6 5262 5026 33 MWG DMY RK 0 10/31/17 5 6455 6001 35 MAG DMY RK 0 06/06/11 4 7402 6795 30 MNG DMY RK 0 06106/11 3 8059 7380 24 MVIG DMY RK 0 06106111 2 8509 7799 20 MAG DMY RK 0 06IOfi111 1 8753 8029 19 MAG DMY RK 0 06/06/11 14-12" HES X NP. D = 3.813" I 3895- I-14-12" HES X NP, D = 3.813" 8982' 9-5/8" X 5-12' UNKSM OV E2SHOT 901W BKRSBRSEALASSY 14-1/2"OTIS XN NP. D=3.725' 1 { 9180' 1-1 -1/Z' VYLtU, D= 3.9 8" 9181' ELMD TT LOGGED ON'?? DATE REV BY COMMENTS DATE REV BY COMMENTS 12116182 AUDI 92 ORIGINAL COMPLETION 0822/11 SWC/ PJC GLV C/O 0820/11 06113MI WES RVVO 12102/15 SWC/JMD GLVC/011130/15 06/17/11 MBM/PJC GLV C/O 11!06/17 CJN/JMD GLV C/0 10!31/17 06/18/11 MBM/PJC PURL JCI SLUGGTTS/PXN PLUG 0726/18 KP/JMD TREEC/O 0721/18) 0621/11 PJC DRLG DRAFT CORRECTION 0422/19 IJXWIJMD, ADPERF 04/19/19 0626/11 JER/ PJC FINAL DRLG CORRECTIONS PRUDHOE BAY UNIT VVELL B-21 PERMR No: 1821780 API No: 50-029-20850-00 , T11 N, R14E, 874' FNL & 189E BP Exploration (Alaska) OPERABLE: Producer B -21 (PTD# 184760) OA Pressure Build Up Manageaeby Bleeds Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator ©bp.com] y Sent: Wednesday, August 24, 2011 2:18 PM l7 / ` l 1( To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: OPERABLE: Producer B -21 (PTD# 1821760) OA Pressure Build Up Manageable by Bleeds All, Producer B -21 (PTD #1821760) passed an OA repressurization test performed from 8/21- 24/2011 with buildup rate of 17 psi /day which is considered as manageable by bleeds. The well passed a PPPOT -IC on 8/7/2011 and a MIT -IA to 3000 psi on 8/20/2011 confirming the presence of two competent barriers in the well. The well is reclassified as Operable. The well has dummy gas lift valves in the well and fluid packed annuli. Please be aware of the potential for annular fluid expansion when bring the well online. Please call if you have any questions. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator ';;�.,1 v 8 20 i . 1 Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Friday, July 29, 2011 7:51 PM To: 'Maunder, Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer B -21 (PTD# 1821760) Sustained OA Pressure Above MOASP All, Producer B -21 (PTD #1821760) has been found to have sustained casing pressure on the OA above MOASP. The wellhead pressures were tubing /IA/OA equal to 1050/1160/1040 psi on 07/27/2011. The well has been reclassified as Under Evaluation and may be produced under a 28 -day clock. The plan forward is as follows: 1. Wellhead: PPPOT -IC 2. DHD: OA repressurization test A TIO plot and wellbore schematic have been included for your reference. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 8/30/2011 UNDER EVALUATION: Producer B4(PTD# 1821760) Sustained OA Press.Above MOASP Page 1 )f 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com] 1 / Sent: Friday, July 29, 2011 7:51 PM �, �� To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK. D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Producer B -21 (PTD# 1821760) Sustained OA Pressure Above MOASP Attachments: B -21 (PTD #1821760) TIO Plot.doc; B -21 (PTD #1821760) wellbore schematic.pdf All, Producer B -21 (PTD #1821760) has been found to have sustained casing pressure on the OA above MOASP. The wellhead pressures were tubing /IA/OA equal to 1050/1160/1040 psi on 07/27/2011. The well has been reclassified as Under Evaluation and may be produced under a 28 -day clock. The plan forward is as follows: 1. Wellhead: PPPOT -IC 2. DHD: OA repressurization test A TIO plot and wellbore schematic have been included for your reference. «B -21 (PTD #1821760) TIO Plot.doc» «B -21 (PTD #1821760) wellbore schematic.pdf» Thank you, Gerald Murphy (alt. Mehreen Vazir) OA '-`P = 21. °e.,, of �t.T.(r Well Integrity Coordinator Office (907) 659 -5102 Ao h& c� Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 AAAINCD A 20n 8/1/2011 PBU B -21 PTD #1821760 7/29/2011 TIO Pressures Plot Well: B -21 4,000 - • 3.000 —0- Tbg 1 --u IA 2000 - — OOA A *— 000A On 1,000 - && • 1 04/30/11 05/07/11 05/14/11 05/21/11 05/28111 06/04111 06/11/11 06/18/11 06/25)11 07/02/11 07/09/11 07/16/11 07/23/11 TREE = 4 -1/16" CM! I WELLHEAD = MCEVOY SAFETY N.:*** 4.1/2" CHROME TBG*** ACTUATOR = BAKER C 'I KB. ELEV = 79.8' BF. ELEV = -._ 44.2_5' KOP = — . w 3200 2217' 1-14 -1 /2" HES X NIP, ID = 3.813" I Max Angle = 36" @ 570(7 GAS LIFT MANDRELS Datum = 9652' I 13-3/8" DV PKR H 2607' I— ST MD TVD DEV TYPE VLV LATCH PORT D' Datum TV D = 8800' SS 7 3528 3515 18 MMG DOME RK 16 06/17/11 6 5262 5026 33 MMG SO RK 20 06/17/11 13 -3/8" CSG, 72 #, L80 BUTT, ID = 12.347" H 2690' 5 6001 DMY 1 f' = 53bv ; 4 7402 6455 6795 30 35 MMG MMG DMY RK RK 0 0 06106/11 06/06/1 3 8059 7380 24 MMG DMY RK 0 06/06/11 Minimum ID = 3/25" @ 9137' 2 8509 7799 20 MMG DMY RK 0 06/06/11 1 8753 8029 19 MMG DCR RKP 0 06/06/11 4 -1/2" OTIS XN NIPPLE I 8832' I- I 4 -1/2" HES X NIP, ID = 3.813" I �� �� 8861' H9-518° X4-112" HES TNT PKR, ID = 3.903" 1 I 8895' H4 -1/2" HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13CR - VAM TOP, -I 8967' .0152 bpf, ID = 3.958" 8982' I 9 -5/8" X 5 -1/2" UNIQUE OVERSHOT ] 15-1/2" TUBING STUB (05 /27/11) I 8975° 90 19' -I BKR SBR SEAL ASSY I 5 -1/2" TBG -IPC, 17 #, L -80 BUTT, 9042' _— 9042' -I9 -5/8" x 5 -1/2" BKR SAB PKR, ID = 4.0" I leal 110 �1 .0232 bpf, ID = 4.892" 9052' - I 6 -5/8" x 4 -1/2" XO, ID = 3.958" I I 9096' H4 -1/2" OTIS X NIP, ID = 3.813" I I TOP OF 7" LNR H. 9105' I 9138' I-14 -112" OTIS XN NIP, ID = 3.725" I ' 4 -1/2" TBG, 12.6 #, L -80 BUTT, -I 9180' .0152 bpf, ID = 3.958" 9179' - -112" TTL BKR SOS I 9180' H4 -1/2" WLEG, ID = 3.958" I 19 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" I-1 9359' I 9181' I-i ELMD TT LOGGED ON ? ? / ? ?I ?? 1 PERFORATION SUMMARY REF LOG: DA -BHCA, 12/11/82 ANGLE AT TOP PERF: 18° @ 9610' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE I 3 -3/8" 4 _ 9610 - 9612 0 07/11/94 3 -3/8" 6 9615 - 9623 0 07/30/95 3 -3/8" 6 9627 - 9635 0 07/30/95 3 -1/8" 4 9628 - 9670 S 02/05/92 3-3/8" 4 9640 - 9650 0 07/11/94 9700' I--I CEMENT PLUG 1 3 -3/8" 4 9660 - 9670 S 07/08/94 �♦ �� ��� ♦ :QQ1 ►a�asaa 3 -3/8" 4 9680 - 9730 5 07/08/94 3-1/8" 4 9700 - 9760 S 02/05/92 I 9755' H7" MARKER JOINT I 7" LNR, 26 #, L -80 U4S XO TO L -80 BUTT I 10080' iiimismir PBTD H 10132" ,T ∎ VAV ; T A 44 1 17" LNR, 26 #, L -80 BUTT, .0383 bpf, ID = 6.276" I-I 10200' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/16/82 AUDI #2 ORIGINAL COMPLETION WELL: B - 21 06/13/11 N7ES RWO PERMIT No: ® 1821760 06/17/11 MBM/PJC GLV C/O API No: 50- 029 - 20850 -00 06/18/11 MBM/PJC PULL JC/ SLUGGITS/ PXN PLUG SEC 31, T11 N, R14E, 674' FNL & 1896' FEL 06/21/11 PJC DRLG DRAFT CORRECTION 06/26/11 JER/ PJC FINAL DRLG CORRECTIONS BP Exploration (Alaska) ,. STATE OF ALASKA ALASK/L AND GAS CONSERVATION COMMIS* REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: ❑ Abandon ® Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Re -Enter Suspended Well ❑ Alter Casing ® Pull Tubing ❑ Perforate New Pool ❑ Waiver ❑ Other ❑ Change Approved Program ❑ Operation Shutdown ❑ Perforate ❑ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ® Development ❑ Exploratory " 182 - 176 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 50 - 20850 - - 7. Property Designation: - 8. Well Name and Number: ADL 028310 PBU B -21 9. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Oil Pool 10. Present well condition summary Total depth: measured 10200' feet Plugs (measured) 9700' feet true vertical 9403' feet Junk (measured) None feet Effective depth: measured 9700' feet Packer: (measured) 8861' & 9042' feet true vertical 8926' feet Packer: (true vertical) 8131' & 8302' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2690' 13 -3/8" 2690' 2690' 4930 2670 Intermediate 9359' 9 -5/8" 9359' 8602' 6870 4760 Production Liner 1095' 7" 9105' - 10200' 8362' - 9403' 7240 5410 Perforation Depth: Measured Depth: 9610' - 9650' JUL 2011 True Vertical Depth: 8840' - 8878' Tubing (size, grade, measured and true vertical depth): 4 -1/2 ", 12.6# 13Cr85 / L -80 9180' 8433' Packers and SSSV (type, measured and true vertical depth): 9 -5/8" x 4 -1/2" HES 'TNT' packer; 8861' 8131' 9 -5/8" x 5 -1/2" Baker'SAB' packer 9042' 8302' 11. Stimulation or cement squeeze summary: Intervals treated (measured): RECEVE1 Treatment description including volumes used and final pressure: I NI .' ( 1 t) 12. Representative Daily Average Productionarmje Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 1,176 29,125 2,780 Not Available Not Available Subsequent to operation: 1,150 29,099 7,597 1,600 925 13. Attachments: ❑ Copies of Logs and Surveys run 14. Well Class after work: ❑ Exploratory — ® Development ❑ Service ❑ Stratigraphic ® Daily Report of Well Operations ® Well Schematic Diagram 15. Well Status after work: ❑ GINJ __ ® Oil ❑ SUSP ❑ WDSPL ❑ Gas ❑ GSTOR ❑ SPLUG ❑ WAG ❑ WINJ 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Jesse Rosenbaum, 564 - 5155 N/A Printed Name Terrie Hubble Title Drilling Technologist / Prepared By Name /Number. Signature 41149 dAARIP Phone 564 -4628 Date / �( Terrie Hubble, 564 -4628 Form 10-404 Revised 10/2010 RED S JAN 3 U 2011 „ '-'1' 76-/( Submit Original Only , 0.. 0 . . .. �IQ : ..:%�CP1 @RtCe� .. ALASKA .- BP. Pager I all' Operatioa mart' Report Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 I End Date: 6/8/2011 jX4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay I Site: PB B Pad Rig Name /No.: NABORS 7ES 1 Spud Date/Time: 6/1/2011 12:00:OOAM I Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. LUWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs Task ' Code NPT 1 NPT Depth',, Phase Description of Operations (hr) (ft) 5/31/2011 18:00 - 00:00 I 6.00 RIGD P 1 PRE 1 RIG DOWN AND MOVE OFF OF B-10. - PAD PREP CONTINUES ON B-21. I ! - MOVE SUB TO CENTER OF PAD. - LAY MATS AND HURCULITE IN CELLAR AND ! 1 ' POSITION BOP STACK IN CENTER OF CELLAR. - SECURE BOP STACK WITH TURN ;BUCKLES AND BRIDGE CRANES. - OPEN AND REMOVE TOP BOP RAMS FOR - - -___ �, INSPECTION. 6/1/2011 1 00:00 06:00 T 6.00 RIGD N WAIT PRE 1 WAITING FOR PAD PREP TO BE COMPLETED ON B-21. - OPEN AND CLEAN BOP RAMS FOR INSPECTION. F6:00 12:00 6.00 RIGD N WAIT PRE CONTINUE TO WAIT ON PAD PREP TO BE !! 1 COMPLETED. - INSPECT BOP RAMS AND CAVITIES. - RE- INSTALL RAMS IN BOP AND CLOSE UP. - SECURE BOP STACK TO PEDESTAL. - CHANGE OUT VALVES IN STEAM SYSTEM. . - SERVICE PIPE SKATE AND MAN RIDER WINCHES. ;- WORK ON PLUMBING IN PITS. 12:00 18:00 6.00 RIGD N WAIT PRE i WAIT FOR PAD PREP AND PRE -RIG WORK I ON B-21. I FINISHED PAD PREP. WELL SUPPORT CREW RIGGED UP ON TREE TO BLEED OFF PRESSURE ON TUBING. PRESSURE ON TUBING AT 200 PSI AT 18:00 HRS. CONTINUE TO PERFORM GENERAL RIG MAINTENANCE AND CLEANING. - HELD A PRE - EXECUTE WELL REVIEW WITH ! CREW. LAID RIG MATS AROUND B-21. 18:00 - 00:00 6.00 l RIGD N WAIT PRE WAITING FOR PRE -RIG WORK ON B-21. ' LITTLE RED SERVICE RIGGED UP ON B-21 TO U -TUBE FREEZE PROTECT. AFTER U- TUBING FOR OVER AN HOUR TUBING AND IA PRESSURES TO 0 PSI. ' SHUT IN AND PRESSURE ON TUBING BUILT TO OVER 400 PSI. RIGGED UP AND U- TUBED :AGAIN. PRESSURE CONTINUED TO BUILD ON TUBING ONLY AFTER SHUT -IN. WELLS GROUP WORKING ISSUE. I ! CONTINUE WITH RIG MAINTENANCE AND I CLEANING. - CLEAN WINDWALLS. - GREASE WASHPIPE AND SERVICE TOP DRIVE. - CHANGE OUT #1 CHARGE PUMP. - INSTALL NEW PIPING FOR DESILTER LINE IN PITS. Printed 6/23/2011 1:17:30PM orth America"- ALASKA BP . Page 2 of 13 perat on Summary Report Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 1 End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay I Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. ; UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs 1 Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/2/2011 r 00:00 - 06:00 6.00 rt RIGD N WAIT 1 PRE WAITING FOR PRE -RIG OPERATIONS ON I B -21. WELLS GROUP CONTINUES TO 'TROUBLESHOOT ISSUES WITH PRESSURE BUILDING ON TUBING ONLY. CALLED OUT FOR TRUCKS TO RE- CIRCULATE THE WELL WITH SEAWATER. CONTINUE WITH GENERAL RIG MAINTENANCE AND CLEANING. 1- CLEANING WINDWALLS. I- CLEANING IN CELLAR. _ ' I- WORKING ON STEAM VALVES IN PITS. 06:00 - 12:00 6.00 1 RIGD N WAIT PRE WAITING FOR PRE -RIG OPERATIONS ON B -21. WELLS GROUP CONTINUES TO TROUBLESHOOT ISSUES WITH PRESSURE BUILDING ON TUBING ONLY. CONTINUE WITH GENERAL RIG MAINTENANCE AND CLEANING. I I - CLEANING WINDWALLS. ' - CHECK KOOMY BOTTLE PRECHARGE. - INSTALL SECONDARY WORKING VLAVE ON _ _ _ IA OF B-21. - -- - -- - - - - - -- 12:00 - 17:00 5.00 RIGD N WAIT PRE I WAITING FOR PRE -RIG OPERATIONS ON B -21. WELLS GROUP CONTINUES TO l ' TROUBLESHOOT ISSUES WITH PRESSURE ' BUILDING ON TUBING ONLY. I WELLS GROUP SETTING BPV IN 8-21 AND REMOVING SCAFFOLDING. CONTINUE WITH GENERAL RIG MAINTENANCE AND CLEANING. 117:00 - 20:30 3.50 MOB P ,' L_ PRE MOVE RIG AND SPOT SI IR AVERa2_ - - _ _ _ SPOT PIT COMPLEX. 20:30 22:00 1.50 MOB P PRE RIG UP LINES TO PITS. SPOT CUTTINGS BOX. 22:00 - 23:00 1.00 WHSUR ' P DECOMP TAKE ON SEAWATER TO PITS. * ** ACCEPT RIG AT 22:00 * ** - 23:00 00:00 1.00 WHSUR P DECOMP RIG UP DSM LUBRICATOR TO TREE AND PRESSURE TEST. - PRESSURE TEST LUBRICATOR 250 PSI LOW 3500 PSI HIGH FOR 5 CHARTED MIN. 6/3/2011 00:00 - 00:30 0.50 WHSUR P I DECOMP CONTINUE TO PRESSURE TEST LUBRICATOR 250/3500 PSI FOR 5 CHARTED MIN. 00:30 - 02:00 1.50 WHSUR P DECOMP SPOT 500 BBL OPEN TOP TANK AND RIG UP HARD LINE TO CELLAR. - PRESSURE TEST HARD LINES TO 3500 PSI. - RIG UP SECONDARY VALVE AND GAUGE ON OA. 02:00 - 02:30 0.50 WHSUR P DECOMP LUBRICATE OUT BPV AND LAY DOWN. - 325 PSI ON TUBING SIDE AFTER PULLING BPV. Printed 6/23/2011 1:17:30PM 1 North America - ALASKA - BP Page•3 of 13 Oration. Summa Report ' ' Common Well Name: ��— - B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 : End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay ' Site: PB B Pad :L Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM , Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To 1 , Hrs Task Code 1 NPT i NPT Depth Phase l Description of Operations (hr) (ft) 02:30 - 08:30 6.00 WHSUR P DECOMP CIRCULATE OUT FREEZE PROTECT. 1 1 - REVERSE DIESEL OUT OF TUBING TO OPEN 1 1 1 TOP TANK. 1 - PUMPED AT 3 BPM AND 3000 PSI. DOWN : 1 THE IA. 1 - REDUCE PUMP RATE TO 2 BPM AND 2900 I PSI. 1 - 133 BBLS OF DIESEL RECOVERED FROM 1 1 THE TUBING SIDE. r ' - LINED UP TO PUMP DOWN THE TUBING AND TAKE RETURNS FROM THE IA TO THE OPEN i TOP TANK. - PUMPED AT 7 BPM AND 1950 PSI. - 51 BBLS OF DIESEL RECOVERED FROM THE IA. - TOTAL DIESEL RECOVERED = 184 BBLS. - CIRCULATE A SURFACE TO SURFACE VOLUME THROUGH THE CHOKE AND GAS BUSTER. - _ ' - 3 BPM AND 520 PSI. 08:30 - 10:00 ' 1.50 WHSUR P DECOMP TMONITOR WELL. RIG DOWN AND BLOW 11 DOWN ALL LINES. `- INITIAL SHUT -IN PRESSURES: -TBG = 0 PSI; IA = 20 PSI. '- BLED BACK 2 BBLS FROM THE IA. - TBG = 0 PSI; IA = 0 PSI. I- MONITORED WELL, NO CHANGE IN PRESSURES. 10:00 - 11:00 I 1.00 WHSUR j P ' DECOMP 1 INSTALL TWC. - RIG UP DSM LUBRICATOR AND PRESSURE TEST. - TEST TO 250/3500 PSI FOR 5 CHARTED ��� 1, MIN. - INSTALL TING. 11:00 - 12:30 1.50 WHSUR P I DECOMP PRESSURE TEST TWC. . - TEST TWC FROM ABOVE TO 250 PSI LOW I AND 3500 PSI FOR 5 CHARTED MIN. - GOOD TEST. / - TEST TWC FROM BELOW TO 250 PSI LOW ✓ AND 3000 PSI HIGH FOR 10 CHARTED MIN. - GOOD TEST. - RIG DOWN AND LAY DOWN DSM LUBRICATOR. 12:30 - 15:00 2.50 WHSUR P DECOMP NIPPLE D WN TREE MILL GfDAPTFR Fl AN(F. PJSM HELD WITH RIG CREW AND CAMERON REPRESENTATIVE. - CAMERON REPRESENTATIVE BLED OFF THE HANGER VOID AND CONTROL LINES. - NIPPLED DOWN THE TREE AND ADAPTER FLANGE AND REMOVED FROM THE CELLAR. - INSPECTED THE TUBING HANGER THREADS. - THREADS WERE IN GOOD CONDITION AND 'XO' MU WITH 7 RIGHT HAND TURNS. — -- - TESTEU THE SIERRA GAS MONITORING 15:00 - 17:30 2.50 BOPSUR P DECOMP ,NIPPLE UP THE E BOP STACK, I SYSTEM AND FOUND NO DEFICIENCIES. 17:30 18:30 1 1.00 BOPSUR P DECOMP RIG UP TO TEST BOPS. - PICK UP ALL TEST TOOLS i - MAKE UP'XO' TO THE TEST JOINT. Printed 6/23/2011 1:17:30PM ° arth America AEASKA BP Page.4of t3' Operatic* Summary',Repert Common ll Name: B -21 W We 1 AFE No Event Type: WORKOVER (WO) I Start Date: 5/31/2011 End Date: 6/8/2011 1 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM I Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date I From - To Hrs Task Code I NPT NPT Depth I Phase I Description of Operations (h (ft) I 1 18:30 - 22:30 4.00 BOPSUR P DECOMP TEST BOPE PER AOGCC REGULATIONS AND I I I I BP ADWOP POLICY. - PRESSURE TESTED TO 250 PSI LOW AND I I 3500 PSI HIGH FOR 5 CHARTED MINUTES. I - TESTED ALL CHOKE MANIFOLD VALVES I I (16 TOTAL). I 1 - MANUAL CHOKE AND MANUAL KILL I VALVES. - HCR CHOKE AND HCR KILL VALVES. I - FULL OPENING SAFETY VALVES (3 1/2 ", ' 4" AND 5"). - 4" DART VALVE. ? - TOP DRIVE AIR ACTUATED IBOP. I - LOWER MANUAL IBOP ON TOP DRIVE. I - BLIND /SHEAR RAMS. - UPPER VBRS WITH 4" AND 5 1/2" TEST JOINT. ' - LOWER VBRS WITH 4" TEST JOINT. - TESTED THE ANNULAR PREVENTER WITH I 4" TEST JOINT. I I - 250 PSI LOW AND 3500 PSI HIGH FOR 5 I CHARTED MINUTES. I - TESTED THE SUPER CHOKE AND MANUAL ♦BEAN CHOKE. - 250 PSI LOW AND 2500 PSI HIGH FOR 5 CHARTED MINUTES. I - PERFORMED AN ACCUMULATOR 1 DRAWDOWN TEST. 18 SEC TO 200 PSI, 89 SEC TO FULL PRESSURE. - 5 BOTTLES WITH 1950 PSI. I '- TESTED THE SIERRA GAS MONITORING I I I SYSTEM. - ALL TESTS WITNESSED BY BP WSL AND NABORS TOOLPUSHER. - AOGCC, JEFF JONES, WAIVED THE STATE'S I RIGHT TO WITNESS THE TEST. 22 :30 - 23:00 I 0.50 I BOPSUR 1 P DECOMP , BLOW DOWN AND RIG DOWN ALL TEST EQUIPMENT. 23:00 - 00:00 ' 1.00 I BOPSUR P I I DECOMP I RIG UP THE DUTCH RISER AND DSM LUBRICATOR. - PJSM WITH RIG CREW AND DSM CREW. - INSTALL DUTCH RISER WITH QUICK -TEST SUB ON TOP AS AN EXTENSION. I - PICK UP AND RIG UP DSM LUBRICATOR AND PREPARE TO TEST. 6/4/2011 00:00 01:00 1.00 BOPSUR P DECOMP PRESSURE TEST DUTCH RISER AND LUBRICATOR AND PULL TWC. - PRESSURE TEST TO 250 PSI LOW 3000 PSI HIGH FOR 5 CHARTED MIN. PULL TWC AND LAY DOWN. - RIG DOWN LUBRICATOR AND DUTCH ' I RISER. Printed 6/23/2011 1:17:30PM e rth America - ALASKA _ €iP Page 5.of 13 Operation Summary Report Common B -21 ! AFE No ' Event Type: WORKOVER (WO) Start Date: 5/31/2011 I End Date: 6/8/2011 (2,000,000.00 ) I Project: Prudhoe Bay Site: PB B Pad ' Rig Name /No.: NABORS 7ES ' Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. LUWI Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs Task ' Code NPT NPT Depth Phase Description of Operations (hr) X01:00 - 02:00 1.00 PULL P DECOMP I PULL TUBING HANGER TO FLOOR. - MAKE UP'XO' TO A JOINT OF DRILL PIPE AND ENGAGE TUBING HANGER WITH 7 RIGHT HAND TURNS. I : - MAKE UP TOP DRIVE. - CAMERON REPRESENTATIVE BACKED OUT I THE LOCK DOWN SCREWS. ! PICKED UP AND UNSEATED THE TUBING ' HANGER WITH 155K LBS. - PULLED THE HANGER TO THE RIG FLOOR. ' - UP WEIGHT = 173K LBS. 1- SCHLUMBERGER REPRESENTATIVE _ ( TERMINATED THE CONTROL LINES. 02:00 - 04:30 2.50 PULL P j DECOMP I CIRCULATE A BOTTOMS UP THROUGH THE CHOKE AND GAS BUSTER. - CLOSED ANNULAR PREVENTER AND LINED 1 UP TO TAKE RETURNS THROUGH THE GAS BUSTER. - PUMPED 395 BBLS AT 3 BPM AND 65 PSI. 04:30 - 05:30 1.00 PULL P DECOMP MONITOR WELL AND LAY DOWN TUBING HANGER. '- OPEN ANNULAR AND FLOW CHECK WELL. , - WELL IS STABLE. LAY DOWN JOINT OF DRILL PIPE AND . X0'. 1- BACK OUT TUBING HANGER AND LAY DOWN. - WELL IS OUT OF BALANCE AND FLOWING OUT OF TUBING. - STAB FOSV AND RIG UP TO CIRCULATE THE WELL. - TOP DRIVE WASHPIPE FAILED BEFORE CIRCULATING COULD BEGIN. - RIG UP A HEAD PIN TO CIRCULATE THE I WELL. - RIG UP TUBING HANDLING EQUIPMENT. 05:30 - 07:00 1.50 PULL P ' 1 DECOMP CIRCULATE SEAWATER THROUGH A HEAD PIN. PUMP AT 6 BPM AND 330 PSI. - REPLACE TOP DRIVE WASHPIPE. I - PJSM WITH RIG CREW PRIOR TO 1 CHANGING WASHPIPE. 07:00 - 08:30 1.50 PULL P DECOMP PUMPED A DRY JOB AND RIGGED DOWN THE HEAD PIN. Printed 6/23/2011 1:17:30PM orth America - ALASKA BP Pag 6 of 'La ' pleration Summate Report . Common Well Name: B -21 I AFE No Event Type: WORKOVER (WO) I Start Date: 5/31/2011 End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay Site: PB B Pad I Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. I UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date I From - To I Hrs Task I Code ; NPT NPT Depth Phase Description of Operations (hr) ! - (ft) 08:30 21:30 I 13.00 PULL I P I DECOMP PULL AND LAY DOWN THE 5 V2" CQMPLETI.QN. - PULL AND LAY DOWN 5 1/2" TUBING WITH CONTROL LINE TO SSSV. - BRAIDED WIRE FROM CONTROL LINES 1 . I WAS WADED UPON JT 10. - PUNCHED TUBING BELOW SSSV TO , [ENSURE NO TRAPPED PRESSURE. - PJSM WITH RIG CREW PRIOR TO PUNCHING TUBING. - RIG DOWN THE CONTROL LINE I SPOOLER. i - CONTINUED TO PULL AND LAY DOWN 5 1/2" I TUBING TO THE CUT JOINT. ' I - RECOVERED THE FOLLOWING FROM THE l WELL: I - 3 SS BANDS. ' - 24 CLAMPS AND PINS. - 208 JOINTS OF 5 1/2" TUBING. (1) SSSV. I - (6) GAS LIFT MANDRELS. - (1) SLIDING SLEEVE. - CUT JOINT OF 5 1/2" TUBING. - LENGHT = 11.41'; OD AT FLARE = 6.25" 21:30 22:00 0.50 P PULL DECOMP I RIG DOWN TUBING HANDLING EQUIPMENT. 22:00 - 23:00 1.00 WHSUR P I I DECOMP I INSTALL 9 3/16 "WEAR RING AND CLEAN AND I _ CLEAR THE RIG FLOOR. 23:00 - 00:00 1 1.00 FISH . P DECOMP I BRING BHA #1, DRESS- OFF COMPONENTS TO RIG FLOOR. -RIG UP TO TEST 4" DART VALVE. - FLOORHAND NOTICED SEAL WAS , ROLLED ON DART VALVE. I - REPAIRED DART VALVE AND RIG UP TO I _ _ TEST. 6/5/2011 00:00 - 00:30 0.50 BOPSUR P DECOMP I PRESSURE TEST 4" DART VALVE TO 250 PSI LOW AND 3500 PSI HIGH AFTER REPAIRS. I - GOOD TEST. - BLOW DOWN AND RIG DOWN TEST EQUIPMENT. Printed 6/23/2011 1:17:30PM orth America 7 , ALASKA, - BP r Page 7 of 13 i Aeration Summary Report Common Well Name: B -21 . _ m AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 End Date: 6/8/2011 fX4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date 1 From - To Hrs Task ! Code NPT NPT Depth 1 Phase 1 Description of Operations (ft) 00:30 02:30 2.00 FISH P DECOMP PICK UP AND RUN IN THE HOLE WITH BHA ! #1, TUBING DRESS -OFF ASSY. - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. ' - PICK UP BHA #1 AS FOLLOWS: - 8 1/2" x 5 9/16" DRESS -OFF SHOE - (3) WASHOVER EXTENSION ! : - - INNER DRESS -OFF MILL - WASHOVER BOOT BASKET - PIN x PIN `XO' I - 8 1/2" STRING MILL I - (2) 7" BOOT BASKET - 9 5/8" CASING SCRAPER BIT SUB WITH FLOAT INSTALLED I - (2) STRING MAGNET I ! I - 43/4" BUMPER' SUB ! - 43/4" OIL JAR PUMP -OUT SUB I - 9 4 3/4" DRILL COLLAR Xp' OVERALL LENGTH = 364.61'. ! MAX OD = 8.50 ". . j MIN ID= 1.81 ". 02:30 - 03:00 0.50 1 FISH P DECOMP PICK UP 4" HT -40 DRILL PIPE FROM THE PIPE SHED. ! - PJSM WITH RIG CREW. I PICK UP AND RUN IN THE HOLE WITH 15 l !JOINTS OF DRILL PIPE. - PULL OUT OF THE HOLE AND STAND BACK 5 STANDS OF DRILL PIPE. -- 03:00 10:00 7.00 FISH P DECOMP ' RUN IN THE HOLE WITH BHA #1 ON 4" HT -40 1 DRILL PIPE. ! PICKING UP DRILL PIPE FROM THE PIPE SHED. - FROM 364' TO 8918' DPM. - FILL THE DRILL PIPE EVERY 10 STANDS. - UP WEIGHT = 167K LBS; DOWN WEIGHT = 148K LBS. 10:00 10:30 I 0.50 FISH I P DECOMP ESTABLISH PARAMETERS AND RUN IN THE HOLE AND TAG THE TOP OF THE TUBING STUB. - TAKE SLOW PUMP RATES AT 8918' MD, 8240' TVD: - PUMP 1: 80 PSI AT 2 BPM; 140 PSI AT 3 BPM. 1 - PUMP 2: 60 PSI AT 2 BPM; 120 PSI AT 3 I BPM. 1 ESTABLISH MILLING PARAMETERS: - 6 BPM AND 540 PSI. - 40 RPM AND 3K FT -LBS OF TORQUE. - RUN IN THE HOLE AND TAG THE TOP OF THE TUBING STUB AT 8971' DPM. Printed 6/23/2011 1:17:30PM orth America - ALAS BP Page 8 of ta: Aeration Summar Report. Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay ' Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM I Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. jUWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations 1 10:30 11:30 (hr) 0 FISH (ft) DECOMP OVER P I WASH OVER AND DRESS OFF THE 5 V2" 1 TUBING STUB. __ 1 1 - WASH DOWN AND SWALLOW 17' OF TUBING STUB TO INNER DRESS -OFF MILL. - 6 BPM AND 600 PSI. - 40 TO 50 RPM AND 3K TO 6K FT -LBS OF TORQUE. - ROTATING WEIGHT = 160K LBS. ! 1 - 2K TO 4K LBS WEIGHT ON MILL. - DRESS -OFF TUBING STUB WITH INNER j MILL. - FROM 8971' TO 8972' DPM. - 6 BPM AND 600 PSI. - 70 RPM AND. 4K TO 6K FT -LBS OF TORQUE. - 5K LBS WEIGHT ON MILL. 11:30 - 13:00 1.50 FISH P DECOMP CIRCUALTE A 40 BBL HIGH -VIS SWEEP. - 12 BPM AND 2000 PSI. - WORK SCRAPER ACROSS THE PACKER SETTING DEPTH OF 8093' WHILE 1.00 FISH P — - 1 13:00 14:00 DECOMP GIRULATING. r [MONITOR THE WELL AFTER CIRCULATING. ' - BLOW DOWN TOP DRIVE. RIG UP TO TRIP OUT OF THE HOLE. 14:00 - 17:30 3.50 FISH P DECOMP TRIP OUT OF THE HOLE WITH BHA #1, TUBING DRESS -OFF ASSY. - FROM 8972' TO 364' DPM. 17:30 - 20:00 2.50 FISH P DECOMP LAY DOWN BHA #1. TUBING DRESS -OFF ASSY. I- RECOVERED 20 LBS OF METAL SHAVINGS FROM THE MAGNETS.. T 1.50 WHSUR P DECOMP PULL THE WEAR RING AND r ND ATTEMPT TO a in. - � 20:00 21:30 i, PULL THE 9 5/8" CASING PACK -OFF. A . -- ENGAGE PACK -OFF WITH RUNNING TOOL. t PACK -OFF CAME FREE WITH 30K LBS. - PACK -OFF SPLIT AND THE LOWER SEAL � I L ' WA LEFT IN THE CASING SPOOL. r 2.00 P — 9 21:30 23:30 FISH DECOMP PICK UP AND RUN IN THE HOLE WITH BHA I #7, .IUNK f.ATCd.ER.- SPEARASSY_ - PJSM WITH RIG CREW AND BAKER FISHING REPRESENTATIVE. - PICK UP BHA #2 AS FOLLOWS: - ITCO SPEAR DRESSED WITH 2.993 GRAPPLE - SPEAR EXTENSION - SPEAR STOP SUB - `XO' SUB - (5) JTS 2 7/8" PAC DRILL PIPE - `XO' SUB - 4 3/4" BUMPER SUB - 4 3/4" OIL JAR , ' - PUMP -OUT SUB 1 - `XO' OVERALL LENGTH = 182.51'. MAX OD = 5 ". MIN ID = 0.50 ". 23:30 00:00 1 0.50 FISH P DECOMP RUN IN THE HOLE WITH BHA #2 ON 4" HT -40 DRILL PIPE FROM THE DERRICK. - TO 658' DPM. Printed 6/23/2011 1:17:30PM orth America = ALASKA SP,. Page s of •3 .� p for "Summary Re Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 1 End Date: 6/8/2011 IX4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay j Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM I Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. 1 UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs I Task Code NPT NPT Depth! Phase Description of Operations (h (ft) 1 6/6/2011 00:00 - 03:30 3.50 FISH P 1 DE COMP ' RUN IN THE HOLE WITH BHA #2, JUNK I ! 'CATCHER SPEAR. - FROM 658' TO 7990' DPM. - FILLING PIPE EVERY 10 STANDS. - UP WEIGHT = 143K LBS; DOWN WEIGHT = 130K LBS. 03:30 - 04:30 1.00 DHB P DECOMP PICK UP HES STORM PACKER AND RUN IN I i THE HOLE. - PJSM WITH RIG CREW AND HES REPRESENTATIVE. - PICK UP STORM PACKER AND RUN IN THE ,I HOLE ONE STAND. ' - SET THE STORM PACKER PER THE HES REPRESENTATIVE. - CENTER OF THE ELEMENT AT 100'. 104:30 06:00 1.50 DHB P DECOMP TEST THE STORM PACKER TO 250 PSI LOW !AND 1000 PSI HIGH. - ATTEMPT TO TEST THE PACKER FROM ABOVE. I - THE SPLIT PACK -OFF WILL NOT HOLD j 'ANY PRESSURE. - RIG UP TO TEST THE STORM PACKER FROM BELOW. - TEST THE STORM PACKER FROM BELOW. - TEST TO 250 PSI LOW FOR 5 CHARTED . MIN. I - TEST TO 1000 PSI HIGH FOR 10 CHARTED MIN. 06:00 - 08:30 2.50 BOPSUR P r DECOMP '� NIPPLE DOWN BOPE STACK AND TUBING t } SPOOL. 08:30 09:30 WHSUR 1.00 P DECOMP -' REMOVE THE MAIN SEAL AND JUNK RING THAT WAS LEFT IN THE CASING HEAD WHEN THE 9 5/8" CASING PACK -OFF SPLIT. - WHILE REMOVING THE DAMAGED PACK -OFF A SMALL AMOUNT OF DEAD 1 CRUDE FREEZE PROTECT FROM THE OA I BUBBLED UP AND OUT OF THE CASING I HEAD. SEE TRACTION REPORT 2011 -IR- 3860434 FOR DETAILS. - INSTALL A NEW 9 5/8" CASING PACK -OFF - CAMERON REPRESENTATIVE RAN IN THE LOCK DOWN SCREWS. 09:30 - 11:30 2.00 WHSUR I P 1 DECOMP NIPPLE UP THE NEW TUBING SPOOL. 11:30 - 12:30 1.00 WHSUR P DECOMP PRESSURE TEST THE HANGER VOID AND PACK -OFF SEALS. - CAMERON REPRESENTATIVE TESTED THE VOID AND SEALS. - 250 PSI LOW FOR 5 CHARTED MIN. - 5000 PSI HIGH FOR 30 CHARTED MIN. - GOOD TESTS. 12:30 - 14:30 2.00 BOPSUR N HMAN DECOMP CLEAN UP CELLAR. 14:30 17:00 2.50 1 BOPSUR P DECOMP 'NIPPLE UP BOPE STACK. Printed 6/23/2011 1:17:30PM orth America ALAS BP Page.la of 13• : . tarration Summa Report Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 End Date: 6/8/2011 ', 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. t I UWI_ Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To I Firs Task Code NPT 1 NPT Depth ' Phase Description of Operations 1 7:00 18:00 1.00 P (ft) I DECOMP 1 hr) - BOPSUR I, TEST BOPE BREAKS TO 250 PSI LOW 3500 I HIGH. - RIG UP TEST EQUIPMENT. I ; - PRESSURE TEST THE BOP / TUBING SPOOL CONNECTION. - 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MIN. ' . - TOP PIPE RAMS CLOSED IN 15 SEC. RIG DOWN TEST EQUIPMENT. INSTALL 9 3/16" WEAR RING IN TUBING ;SPOOL. 18:00 - 19:00 1.00 DHB P DECOMP UNS AND RETRIEVE THE HES 95/8" , STORM PACKER. - PJSM WITH RIG CREW AND HES IL REPRESENTATIVE. I- MAKE UP RUNNING TOOL AND FSOV. - ENGAGE HES STORM PACKER. 1 ' - CLOSE ANNULAR PREVENTER AND VERIFY 1 THAT THERE IS 0 PRESSURE BELOW THE I STORM PACKER. - ANNULAR CLOSED IN 29 SEC. RELEASE THE HES STORM PACKER AND I OPEN THE ANNULAR PREVENTER. PULL AND LAY DOWN THE HES STORM PACKER AND RUNNING TOOL. 19:00 21:00 2.00 FISH 1 P DECOMP RUN IN THE HOLE WITH BHA #2 TO THE TOP OF THE TUBING STUB AT 8972' DPM. - ESTABLISH FISHING PARAMETERS: - UP WEIGHT = 158K LBS; DOWN WEIGHT = 139K LBS. - 2 BPM AND 350 PSI; 3 BPM AND 750 PSI; 5 'BPM AND 2230 PSI. - WORK JUNK CATCHER SPEAR INTO 5 1/2" I TUBING STUB. ! - REQUIRED SEVERAL ATTEMPTS TO GET I SPEAR INTO TUBING STUB. ENGAGE JUNK CATCHER AND CONTINUE DOWN TO 9114' DPM. - PICK UP ABOVE THE 5 1/2" TUBING STUB TO 896T DPM. 21:00 - 23:00 2.00 FISH 1 P DECOMP CIRCULATE THE WELL TO CLEAN I SEAWATER. DROP THE BALL AND OPEN THE PUMP -OUT SUB WITH 1600 PSI. - DISPLACE THE WELL TO CLEAN 8.5 PPG SEAWATER. - 11 BPM AND 1200 PSI. - SLOW PUMP RATES OBTAINED AT 8780' MD AND 8070' TVD. - PUMP 1:70 PSI AT 2 BPM; 130 PSI AT 3 I BPM. - PUMP 2: 70 PSI AT 2 BPM; 130 PSI AT 3 BPM. 23:00 - 23:30 0.50 FISH P DECOMP MONITOR WELL AFTER DISPLACEMENT. - NO FLOW. 23:30 00:00 0.50 FISH P DECOMP PULL OUT OF THE HOLE WITH BHA #2 AND FISH, LAYING DOWN 4" DRILL PIPE. - FROM 8967' TO 8646' DPM. 6/7/2011 00:00 04:30 4.50 FISH P DECOMP ' CONTINUE TO PULL OUT OF THE HOLE WITH I BHA #2, JUNK CATCHER SPEAR, LAYING DOWN 4" HT -40 DRILL PIPE. - FROM 8646' TO 182' DPM. Printed 6/23/2011 1:17:30PM orth America ,- ALASKA - BP Page 11 of 1 i peeati: • on Summary Report ' Common Well Name: B-21 ! AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 I I End Date: 6/8/2011 X4-00TMQ-E (2,000,000.00 ) 1 . Project: Prudhoe Bay Site: PB B Pad Rig Name/No.: NABORS 7ES ; Spud Date/Time: 6/1/2011 12:00:OOAM ' Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date l From - To Hrs . Task Code I NPT NPT Depth I Phase I Description of Operations 1 (hr) L (ft) 1 04:30 - 06:00 ' 1.50 FISH P 1 DECOMP LAY DOWN BHA #2, JUNK CATCHER SPEAR. I - JUNK CATCHER WAS NOT ON THE SPEAR. 06:00 - 06:30 0.50 FISH P [ DECOMP , PICK UP AND RUN IN THE HOLE WITH THE I , I ' TWO REMAINING STANDS OF DRILL PIPE IN THE DERRICK. PULL OUT OF THE HOLE AND LAY DOWN THE ! _I_ 4" HT-40 DRILL PIPE. 06:30 - 09:30 3.00 RUNCOM P ' RUNCMP RIG UP TO RUN 4 1/2", 12.6 LB/FT, 13CR-85, I , ■VAMTOP COMPLETION. , I , - PJSM WITH RIG CREW AND NABORS , • I CASING REPRESENTATIVE. MAKE DUMMY RUN WITH TUBING HANGER [ ! I AND MARK LANDING JOINT. [ - RIG UP DOUBLE STACK TONGS. - RIG UP SINGLE JOINT COMPENSATOR AND I , : TORQUE TURN EQUIPMENT. 09:30 - 21:00 1 11.50 RUNCOM ' P I RUNCMP I RUN 4 1/2", 12.6 LB/FT, 13CR-85, VAMTOP I [ , I COMPLETION PER RUNNING ORDER. I I I , , I - PJSM WITH RIG CREW, CASING I , , [ • REPRESENTATIVE AND HES : ! REPRESENTATIVE. ! 1 , I , , : I - MAKE UP AND RUN IN THE HOLE WITH THE • UNIQUE MACHINE OVERSHOT AND .COMPLETION EQUIPMENT. OPTIMUM TORQUE ON 4 1/2" VAMTOP TUBING = 4440 FT-LBS. - RUN IN THE HOLE TO 8970'. , , I - UP WEIGHT = 135K LBS; DOWN WEIGHT = , . 118K LBS. 21:00 - 22:30 1 1.50 . RUNCOM , P RUNCMP !SPACE OUT AND LAND 4 1/2" COMPLETION. 1 : - TAG TOP OFYCIBING AT 8975'. [ I 1 - FIRST SHEAR PINS AT 8979' WITH 1 OK LBS. , 1- SECOND SHEAR PINS AT 8987' WITH 8K 11 : LBS. 1 1 - NO-GO AT 8989' SET DOWN 1 OK LBS. , - PICK UP TO 8890' AND PERFORM SPACE 1 , OUT. - ADDED (1) PUP JOINT - 19.84'. 1 1 - MADE UP TUBING HANGER AND LANDED THE 4 1/2" COMPLETION. - BOTTOM OF UNIQUE MACHINE OVERSHOT AT 8982'. - CAMERON REPRESENTATIVES RAN IN THE LOCK DOWN SCREWS. 22:30 - 00:00 1.50 RUNCOM P RUNCMP RIG DOWN TUBING HANDLING EQUIPMENT. 1 ' - WAITING FOR 2 VAC TRUCKS WITH CORROSION INHIBITED SEAWATER. - VAC TRUCKS WERE TIED UP FROM ANOTHER JOB. 6/8/2011 00:00 - 01:30 1.50 RUNCOM N WAIT RUNCMP CONTINUE WAITING FOR VAC TRUCKS WITH CORROSION INHIBITED SEAWATER. - TRUCKS WERE TIED UP WITH ANOTHER JOB AND HAD TO BE CLEANED BEFORE PICKING UP SEAWATER. Printed 6/23/2011 1:17:30PM Orth America - ALASKA BP Page t2. of 1 peration Summary Report Common Well Name: B -21 AFE No Event Type: WORKOVER (WO) Start Date: 5/31/2011 1 End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) I Project: Prudhoe Bay Site: PB B Pad Rig Name /No.: NABORS 7ES Spud Date/Time: 6/1/2011 12:00:OOAM I Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. i UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations II I (hr) ft 01:30 - 04:00 fi 2.50 r RUNCOM P RUNCMP I REVERSE CIRCULATE CLEAN SEAWATER FOLLOWED BY CORROSION INHIBITED I SEAWATER. - STAGE PUMPS TO 5 BPM AND 330 PSI PER I HES REPRESENTATIVE. , - REVERSED 130 BBLS, 120 DEG F, CLEAN, 8.5 PPG SEAWATER. 1 - REVERSED 490 BBLS, 120 DEG F, 8.5 PPG SEAWATER WITH KI -3908 CORROSION INHIBITOR. 04:00 06:00 2.00 RUNCOM P RUNCMP DROP BALL & ROD, SET HES 'TNT PACKER AND TEST. - MADE UP THE LANDING JOINT AND i DROPPED THE BALL & ROD. '- LAID DOWN THE LANDING JOINT AND I CLOSED THE BLIND/SHEAR RAMS. I ! I- PRESSURED UP ON THE TUBING SIDE AND I I SET THE HES 'TNT' PACKER. - PERFORMED A 250 PSI LOW TEST FOR 5 CHARTED MIN. ' - CONTINUED TO PRESSURE UP ON TUBING SIDE. - INDICATION OF PACKER SETTING AT 2100 PSI. I - CONTINUED UP TO 3923 PSI FOR HIGH PRESSURE TEST. - ATTEMPTED TO TEST THE TUBING SIDE FOR 30 CHARTED MIN. - LOST 114 PSI IN THE FIRST 15 MIN. - LOST 85 PSI IN THE SECOND 15 MIN. - TEST FAILED TO MEET BP CRITERIA. - BLED OFF TUBING AND ATTEMPTED TO TEST AGAIN - 250 PSI LOW TEST FOR 5 CHARTED MIN. - PRESSURED UP TO 3797 PSI. - LOST 85 PSI IN THE FIRST 15 MIN. - LOST 51 PSJ.Nd"TktF FCOND 15 MIN. - LOS3-49 PSI IN THE THIR 5 MIN. --(JEST FAILED TO MEET B CRITERIA' \__ - NOTIFIED NS RWO PER1N ET NDENT TO DISCUSS OPTIONS. 06:00 - 08:30 2.50 RUNCOM P RUNCMP DELIDF TO PSI TFST THE IA TO CONFIRM,. - TUBING AND PACKER INTEGRITY - PRESSURE UP ON THE IA TO 250 FOR 5 MIN / , GOOD - PSI UP TO 3500 FOR 30 MIN - BLEED OFF 15 =70, 30 =24 - GOOD TEST - BLEED TBG AND IA TO 0 PSI - RETEST TUBING 250 LOW - GOOD TEST - 3500 HIGH FOR 30 MIN - BLEED OFF 15 =70, 30 =32, TEST PASSED - CALL NS OPS SUPT W/ TEST RESULTS AND GET OK TO PROCEED - BLEED TBG TO 0 PSI, PRESSURE UP IA TO 2400 - SHEAR VALVE - PUMP 2 BBLS EACH WAY TO CONFIRM 08:30 - 09:30 1.00 RUNCOM P RUNCMP PJSM TO INSTALL WELLHEAD - R/R CAMERON AND INSTALL TWC - PRESSURE ABOVE 250 FOR 5 MIN, 3500 FOR 10 MIN, PRESSURE TEST FROM BELOW 250 FOR 5 MIN, 1000 FOR 10 MIN Printed 6/23/2011 1:17:30PM orth America - ALASKA BP 0!ge 13 of . 13 - eratiar�,,Summa Report . R Common Well Name: B -21 AFE No — Event Type: WORKOVER (WO) r Start Date: 5/31/2011 End Date: 6/8/2011 X4- 00TMQ -E (2,000,000.00 ) Project: Prudhoe Bay ; Site: PB B Pad --- - - -- — -- - - - -- Rig Name /No.: NABORS 7ES ; Spud Date/Time: 6/1/2011 12:00:OOAM Rig Release: 6/8/2011 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: 30 : 21 11/26/1982 00:00 @79.80ft (above Mean Sea Level) Date From - To I Hrs Task I Code NPT NPT Depth 1 Phase Description of Operations (hr) i (ft) 09:30 10:00 1 1 0.50 BOPSUR P RUNCMP PJSM - BREAK DOWN ALL LINES TO STACK ' I AND PITS - SUCK OUT STACK FROM ABOVE 10:00 - 11:30 1.50 BOPSUR P RUNCMP PJSM - ND ROPE AND RACK BACK AND SECURE FOR MOVE 11:30 - 14:00 2.50 WHSUR P ; RUNCMP 1PJSM - CLEAN TUBING HANGER AND SPOOL, NU ADAPTER FLANGE - PSI TEST HANGER VOID AND SEALS TO 250 LOW FOR 5MIN, _ i 1 5000 HIGH FOR 30 MINUTES - GOOD TEST } 114:00 - 15:00 1.00 WHSUR P �', RUNCMP NIPPLE UP 4 1/16" 5M TREE. . - PJSM WITH RIG CREW AND CAMERON _ __ __ _ REPRESENTATIVE. 1 __ 15:00 - 16:30 ' 1.50 WHSUR P , RUNCMP 1 PRESSURE TEST TREE. I- 250 PSI LOW FOR 5 CHARTED MIN. — 5000 PSI HIGH FOR 30 CHARTED MIN. GO TESTS. 16:30 - 18:00 1.50 WHSUR P I RUNCMP 1 RIG UP DSM LUBRICATOR AND PULL TWC. PJSM WITH RIG CREW AND DSM CREW. - RIG UP LUBRICATOR AND TEST 250 PSI LOW AND 3000 PSI HIGH FOR 5 CHARTED i MIN. - PULL AND LAY DOWN TWC. RIG DOWN DSM LUBRICATOR. 18:00 - 19:30 1.50 WHSUR P ' RUNCMP REVERSE CIRCULATE DIESEL FREEZE PROTECT. • - PJSM WITH RIG CREW AND LRS. j 1 - RIG UP LRS LINES AND PRESSURE TEST LINES 300/2000 PSI. - REVERSE IN 155 BBLS OF DIESEL AT 3 BPM T AND 400 PSI. 19:30 - 20:30 1.00 WHSUR P RUNCMP ALLOW DIESEL FREEZE PROTECT TO 1 U -TUBE. 20:30 22:00 1.50 WHSUR P i , ' RUNCMP RIG UP DSM LUBRICATOR AND INSTALL BPV. ': PJSM WITH RIG CREW AND DSM. - RIG UP LUBRICATOR AND PRESSURE TEST TO 250/3000 PSI FOR 5 CHARTED MIN. INSTALL BPV. ' 22:00 - 22:30 0.50 WHSUR P RUNCMP TEST BPV WITH LRS PUMP. TEST BPV TO 250 PSI FOR 5 CHARTED MIN. - TEST BPV TO 1000 PSI FOR 10 CHARTED MIN. GOOD TESTS. - RIG DOWN LRS AND DSM. 22:30 00:00 1.50 WHSUR P RUNCMP SECURE TREE AND CELLAR AND RELEASE RIG AT 00:00. Printed 6/23/2011 1:17:30PM TREE = • 4- 1/16" CIW WELLHEAD = MCEVOY • SAFETY N. * ** 4 -1 /2" CHROME TBG *** ACTUATOR = BAKER C B-21 KB. ELEV = 79.8' BF. ELEV = . . 44.25x KOP = 3200' 2217' H4-1/2" HES X NIP, ID = 3.813" I Max Angle = 36° @ 5700' GAS LIFT MANDRELS Datum MD = 9652' 13 -3/8" DV PKR I-1 2607' I ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum TVD = 8800' SS 7 3528 3515 18 MMG DOME RK 16 06/17/11 6 5262 5026 33 MMG SO RK 20 06/17/11 13 -3/8" CSG, 72 #, L80 BUTT, ID = 12.347" I—I 2690' 5 6455 6001 35 MMG DMY RK 0 06/06/11 RI li 4 7402 6795 30 MMG DMY RK 0 06/06/11 3 8059 7380 24 MMG DMY RK 0 06/06/11 Minimum ID = 3.725" @ 9137' 2 85 7799 20 MMG DMY RK 0 06/06/11 4 -1/2" OTIS XN NIPPLE 1 8753 8029 19 MMG DCR RKP 0 06/06/11 8832' I -14 -112" HES X NIP, ID = 3.813" 1 ICA O.-MI 8861' H9-5/8" 9 -5/8" X 4-1/2" HES TNT PKR, ID = 3.903" I I 8895' H4 -1/2" HES X NIP, ID = 3.813" I 4 -1/2" TBG, 12.6 #, 13CR -85 VAM TOP, -I 8967' .0152 bpf, ID = 3.958" 8982' H9-5/8" X 5-1/2" UNIQUE OVERSHOT 1 5 -1/2" TUBING STUB (05/27/11) I 8975' 9019' 1-I BKR SBR SEAL ASSY I 5 -1/2" TBG -IPC, 17 #, L -80 BUTT, -1 9042' 9042' 1H 9-5/8" x 5 -1/2" BKR SAB PKR, ID= 4.0" 1 .0232 bpf, ID = 4.892" 9052' H6-5/8" x 4-1/2" X0, ID = 3.958" I 1 9096' J- I4 -1/2" OTIS X NIP, ID = 3.813" I TOP OF 7" LNR IH 9105' 9138' I 4 -1/2" OTIS XN NIP, ID = 3.725" I i I 4 -1/2" TBG, 12.6 #, L -80 BUTT, --I 9180' .0152 bpf, ID = 3.958" 9179' I 4 -1/2" TTL BKR SOS I 9 -5/8" CSG, 47 #, L -80 BUTT, ID = 8.681" I 9359' 9180' ( 4 -1/2" WLEG, ID = 3.958" 9181' I ELMD TT LOGGED ON ? ? / ? ? / ?? 1 PERFORATION SUMMARY REF LOG: DA -BHCA, 12/11/82 ANGLE AT TOP PERF: 18' @ 9610' Note: Refer to Production DB for historical perf data ' SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 4 9610 - 9612 0 07/11/94 1 3 -3/8" 6 9615 - 9623 0 07/30/95 3 -3/8" 6 9627 - 9635 0 07/30/95 3 -1/8" 4 9628 - 9670 S 02/05/92 1 3 -3/8" 4 9640 - 9650 0 07/11/94 3 -3/8" 4 9660 - 9670 S 07/08/94 :COX J 9700' H CEMENT PLUG I 3 -3/8" 4 9680 - 9730 S 07/08/94 3 -1/8" 4 9700 - 9760 S 02/05/92 9755' I- 7" MARKER JOINT I 7" LNR, 26 #, L -80 0J4S X0 TO L -80 BUTT I—I 10080' P B T D I- 1 1013 2' 1 �1' 1' 1' 1' 1' 1' 1' i 1/1111N H 7" LNR, 26 #, L -80 BUTT, .0383 bpf, ID = 6.276" 10200' /.�1.1.1.1.��1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/16/82 AUDI #2 ORIGINAL COMPLETION WELL: B -21 06/13/11 N7ES RWO PERMIT No: 1821760 06/17/11 MBM/PJC GLV 0/0 API No: 50- 029 - 20850 -00 06/18/11 MBM/PJC PULL JC/ SLUGGITS/ PXN PLUG SEC 31, T11 N, R14E, 674' FNL & 1896' FEL 06/21/11 PJC DRLG DRAFT CORRECTION 06/26/11 JER/ PJC FINAL DRLG CORRECTIONS BP Exploration (Alaska) • WELL LOG TRANSMITTAL P- 26PROAcrivE DiAynosric SERVICES, Inc. To: AOGCC Christine Mahnken 333 W. 7th Ave A ° 0 201 Suite 100 �� �� Anchorage, Alaska 99501 (907) 793 -1225 RE : Cased Hole /Open Hole /Mechanical Logs and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2 -1 900 Benson Blvd. Anchorage, Alaska 99508 and S a-- (( 9C ProActive Diagnostic Services, Inc. l Attn: Robert A. Richey --3 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245 -8952 1) Leak Detection - WLD 4- Beca49s . B-21 BL / EDE 50 -029- 20850 -00 77-.4C(4 —14 Signed : Date : FEB I 0 11 Print Name: i ` G S COM. COrtorniSSIOn PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245 -8951 FAx: (907)245 -88952 E-MAIL : pdsanchoraaeememorvloa.com WEBSITE : www.memoryloa.com C:\Documents and Settings\Diane Wi lisms\Desktop \Transmit_BP.docx • ~~ PROACTIVE DAAGNOSTIG SERVICET~ INC. To: AOGCC Christine Mahnken 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907j 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the following BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Joe Lastufka LR2-1 900 Benson Blvd. Anchorage, Alaska 99508 and E ~~`~ L7~o l l 1~0~ ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Leak Detection - WLD 29,Ju1-10 B-21 2) BL / EDE 50-029-20850-00 AUK ~ ~, ZOt~J Signed : Date ~~ ~. ~i3MPYli~aiUn Print Name: ~citc(~c~ PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (9071245-88952 E-MAIL : pdsanchorageC~memorvloa.com WEBSITE : www.memon{log.com C:\Doc~unen~c and Settings\Diane Wiiliazns\Desk[op\Transmit_BP.docx o7/oeno • Schlum6~rger Alaska Data & Consulting Services 2525 Gamball Street, Suke 400 Anchorage, AK 99503-2938 ATTN: Beth Well Job a? Log Description Date BL . ~U N0. 5557 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Color CD 04-45 AYKP-00086 JEWELRY LOG/PERF RECORD '~_ 06/25/10 1 i L-203 P-28 83SG-00065 AYiM-00047 USR USIT 05/02!10 06/08/10 1 1 1 1 P-28 BB6M-00018 SONIC CBL O6h 4/10 1 1 N-01A B-Ot AYKP-00092 BCRD-00031 PRODUCTION PROFILE LEAK DETECTION LOG O7/OS/10 07/02/10 1 1 1 1 N-16 BCRD-00032 PRODUCTION PROFILE .07/04/10 t 1 W-21 A H-D2A BAUJ-00034 AYKP-00088 MEMORY PROD PROFILE USIT 07/03/10 06/26/10 1 1 1 1 B-138 N-23A AYKP-00091 85JN-00048 SCMT RST 07/02/10 04/16/10 1 1 1 1 8-21 B3SG-00062 RST 04/28/10 1 1 \ BP Exploration (Alaska) Inc. ~v~ y Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gamball Street, Suite 400 Anchorage, AK 99503-2a39 6 ~2 STATE OF ALASKA ALASK~L AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATfONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other Q OA TOP Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extension ^ JOB Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ CEMENT 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development Q Exploratory ^ 182-1760 3. Address: P.O. Box 196612 Stratigraphic^ Service 6. API Number: Anchorage, AK 99519-6612 50-029-20850-00-00 8. Property Designation (Lease Number) : 9. Well Name and Numb ~ ` l l ~ ADLO-028310 ~~~'~~ ~ d PBU B-21 i 10. Field/Pool(s): \ PRUDHOE BAY FIELD / PRUDHOE OIL POOL E~ EB 0 ~ ~ Q ~O 11. Present Well Condition Summary: A~~L~ ®~ ~ B~ C~~ CO~f~ Total Depth measured 10200 feet Plugs (measured) 9700' CEM PLUG feet ~~1~~~~~~ true vertical, 9402.71 feet Junk (measured) None feet Effective Depth measured 10132 feet Packer (measured) 9042 2146 true vertical 9338 feet (true vertical) 8302 2146 Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" SURFACE - 146 SURFACE - 146 Surtace 2654 13-3P' 72# L-80 SURFACE - 2688 SURFACE - 2688 4930 2670 Intermediate 9323 9-5/8" 47# L-80 SURFACE - 9358 SURFACE - 8601 6870 4760 Production Liner 1095 7" 26# L-80 9105 - 10198 8362 - 9403 7240 5410 Liner Perforation depth: Measured depth: SEE ATTACHED - _ _ _ True Vertical depth: _ _ _ - _ Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# LL-80 SURFACE - 9042 SURFACE - 8302 4-1/2" 12.6# L-80 9081 -9178 8339-8431 Packers and SSSV (type, measured and true vertical depth) 5-1/2" bkr sab pkr 9042 8302 5-1/2" OTIS SSSVLN 2146 2146 12. Stimulation or cement squeeze summary: Intervals treated measured: - ~~~ (-, ~~~ ~ ~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 1396 30206 2976 1121 Subsequent to operation: 1465 31373 3022 1107 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Harry R. En Printed Name Harry R. Ei g~ Title Engineer Team Leader Signature ~ Phone 564-4194 Date 2/1/2010 inn Mn Form 10-404 Revised 7/2009 RBD ~B ~ 3 2uW ~1~~-'Y\ _ /_ Z. 3.~ ~ S mit Original Only ~""-' ~' ~.~/s B-21 182-176 PERF ATTA(:HMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base B-21 7/3/83 PER 9,628. 9,670. 8,857.3 8,897.27 B-21 7/3/83 PER 9,700. 9,760. 8,925.84 8,983.01 B-21 2/5/92 SQZ 9,628. 9,670. 8,857.3 8,897.27 B-21 2/5192 SQZ 9,700. 9,760. 8,925.84 8,983.01 B-21 2/10/92 APF 9,680. 9,700. 8,906.79 8,925.84 B-21 2/10/92 RPF 9,700. 9,750. 8,925.84 8,973.47 B-21 10/5/92 SQZ 9,680. 9,760. 8,906.79 8,983.01 B-21 10/5/92 SQZ 9,628. 9,670. 8,857.3 8,897.27 B-21 10/8/92 RPF 9,680. 9,730. 8,906.79 8,954.41 B-21 11/9/92 RPF 9,660. 9,670. 8,887.75 8,897.27 B-21 7/8/94 SQZ 9,628. 9,670. 8,857.3 8,897.27 B-21 7/8/94 SQZ 9,680. 9,760. 8,906.79 8,983.01 B-21 7/11/94 APF 9,610. 9,612. 8,840.17 8,842.08 B-21 7/11/94 RPF 9,640. 9,650. 8,868.72 8,878.24 B-21 7/30/95 APF 9,615. 9,623. 8,844.93 8,852.54 B-21 7/30/95 RPF 9,627. 9,635. 8,856.35 8,863.96 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • B-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 11/30/2009T/I/O = 1150/1120/780. Temp = 150". Obj: OA top job (pre-Bluegoo). 20" conductor is 25' deems (dry). Pumped 4.5 bbls 15.7# Arctic Set cement into j conductor un iT~ filled to 3" from top of the flutes. ["""Job Complete'"** SV =Closed. WV, SSV, MV =Open. IA & OA = OTG. NOVP. FLUIDS PUMPED BBLS 4.5 15.7# ACRTIC SET CEMMENT ,/ 4.5 Total TREE _ ~ 6" MCEVOY 'WELLHEAD"= MCEVOY''. ACTUATOR = OTIS'. KB. ELEV = 79.75'1 BF. ELEV = 44.25' KOP = 3200' Max Angle = 36 @ 5800' Datum MD = 9652' Datum TV D = 8800' SS • 13-318" CSG, 72#, L80, ID = 12.347" Minimum ID = 3.725" @ 9137' 4-1/2" OTIS XN NIPPLE 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" I-I 9042' TOP OF 7" LNR ~-{ 9105` ~ 4-1l2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~-~ 917$` 4-1l2" OTIS X NIP, ID = 3.813" 4-1/2" OTIS XN NIP, ID = 3.725" 917$` ~ 4-112" TTL BKR SOS 91$1` ELMDTTLOGNOTAVAILABLE 9-518" GSG, 47#, L-80, ID = 8.681" (--~ 935$` PERFORATION SUMMARY REF LOG: DA-BHCA, 12/11/82 ANGLE AT TOP PERF: 17 @ 9610' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9610 - 9612 O 07!11!94 3-318" 6 9615 - 9623 O 07/30/95 3-3/8" 6 9627 - 9635 O 07/30/95 3-118" 4 9628 - 9670 S 02/05/92 3-3/8" 4 9640 - 9650 O 07/11/94 3-3/8" 4 9660 - 9670 S 07/08/94 3-3(8" 4 9680 - 9730 S 07/08/94 3-118" 4 9700 - 9760 S 02/05/92 B -~ ~ SAFET ES: *** IA x OA COMM. OPERATING LIMITS: MAX IAP =1000 PSI; MAX OAP =1000 PSI (01/03!06 WAIVER) *** 2032' 5-112" OTIS SSSV LANDING NIP, ID = 4.562" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATC PORT DATE 6 3093 3011 9 OTIS-LBD DMY RM 0 02107!06 5 5215 4908 33 OTIS-LBD DMY RM 0 02/07/06 4 6949 6329 33 OTIS-LBD DMY RA 0 3 8063 7304 23 OTIS-LBD DMY RA 0 2 8722 7920 19 OTIS-LBD DMY RA 0 1 8881 8070 19 OTIS-LBD DMY RA 0 $952` -~5-1/2" OTIS XA SLIDING SLV, ID = 4.562" 9019` -{BKR SBR SEAL ASSY' 9042' 9-5/8" x 5-112" BKR SAB PKR, ID = 4.0" 9700' I-I CEMENT PLUG 9745' ~-~ MA RKER JOINT PBTD --i ~ 0 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" -~ DATE REV BY COMMENTS DATE REV BY COMMENTS 12!16/82 ORIGINAL COMPLETION 01/03106 COM/PJC WAIVER SAFETY NOTE 02/13/06 TEUPAG GLV C!O (02/07106) 08!08/06 JLW/PJC SETTTP (02/16/06) 03(03/09 JCM/SV PULL TTP (02/24/09) PRUDHOE BAY UNIT WELL: B-21 PERMIT No: 1821760 API No: 50-029-20850-00 SEC 31, T11N, R14E BP Exploration (Alaska) Preble, Gary B (SAIC) Page 1 of 1 From: Winslow, Jack L (ASRC) Sent: Saturday, January 23, 2010 8:31 AM To: Preble, Gary B (SAIC) Subject: RE: 10-404s for top jobs from '09 Gary - ~8a-r76 Would you need any other information to do 10-404s for these jobs? We will need them filed. Thanks - jack L. Winslow Well Integrity Engineer ofc: (907) 659-5766 harmony: 2377 alt: Ryan Holt From: Preble, Gary B (SAIC)..... ~- U Sent: Friday, January 22, 2010 3:04 PM To: Winslow, Jack L (ASRC) Subject: RE: 10-404s for top jobs from '09 ~ Jack, No requests for those jobs. The only request I got was for a top job for 04-02 on 11/24/09. From: Winslow, Jack L (ASRC) Sent: Friday, January 22, 2010 2:31 PM To: Preble, Gary B (SAIC) Subject: 10-404s for top jobs from '09 Gary - Did anyone request 10-404s for the wells we did top jobs on last year for the RG-2401 project? The following wells were treated: A-2 5.8 BBLs 11/27/09, 1 4.5 BBLs 11/30/09 B-22A 6.5 BBLs 11 /30/09 - ' -'\ , B-23 A 2.2 BBLs 11 /30/09 ~ l~ ~'~~ `~~ ~,, ~~ Thanks - ~ ~ ) ack L. Winslow ~ l I Well Integrity Engineer ofc: (907) 659-5766 /~ ~ harmony: 2377 /~ alt: Ryan Helt ( (((~ __.--. 1/25/2010 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 11, 2009 ~~;2~~~:~ .1~1`~ Ky ~~ ~~~~`~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Pad B Dear Mr. Maunder, bP ~aa~ ~~~ :.. . > .~ ~~:~n ~~ri~rnssan ,, ~~.~ 8~~76 p-al Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad B that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date: 12/11/09 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al B-01 1700080 50029200590000 Sealed Conductor NA NA NA NA NA B-02 1961110 50029200660100 Sealed Conductor NA NA NA NA NA B-03A 1870480 50029203060100 NA 0.5 NA 3.40 8/20/2009 B-04 1700320 50029200720000 Sealed Conductor NA NA NA NA NA B-05B 2010680 50029202760200 NA 1.8 NA 13.60 8/22/2009 B-O6 1770740 50029202790000 NA 1 NA 5.10 8/20/2009 B-07 1780020 50029202850000 NA 1 NA 5.10 8/20/2009 B-OS 1780410 50029203140000 NA 1 NA 6.80 8/20/2009 B-09 1780490 50029203160000 NA 0.5 NA 3.40 8/20/2009 8-10A 2082050 50029203210100 Cellar liner welded to casin NA NA NA NA NA B-11 1780690 50029203310000 NA 0.5 NA 3.40 8/20/2009 B-12 1970090 50029203320100 NA 0.6 NA 3.40 8/22/2009 B-13 1990570 50029203410100 NA 0.4 NA 1.70 8/20/2009 B-14 2090590 50029203490000 NA 0.4 NA 1.70 8/20/2009 B-15 1790190 50029203600000 NA 0.1 NA 1.70 8/20/2009 B-16 1790250 50029203650000 NA 0.8 NA 5.10 8/21/2009 B-17 1790280 50029203680000 NA 0.1 NA 1.70 8/20/2009 B-18 1820020 50029207020000 NA 1.5 NA 15.30 8/21/2009 B-19 2001610 50029207030100 NA 0.1 NA 1.70 8/21/2009 B-20 1821680 50029208420000 NA 0.5 NA 3.40 8/21/2009 B-21 1821760 50029208500000 25 4.5 BBLs 0.1 11/30/2009 1.70 12/3!2009 B-22A 2001570 50029207590100 34 6.5 BBLs 0.2 11/30/2009 1.70 12/3/2009 B-23 1970590 50029207790100 12 2.2 BBLs 3.2 11/30/2009 10.20 12/4/2009 B-24 1821400 50029208150000 NA 3 NA 22.10 8/21/2009 B-25 1821510 50029208260000 NA 0.25 NA 1.70 8/13/2009 6-26 2000570 50029209760200 NA 0.3 NA 1.70 8/21/2009 B-27 1961010 50029214710100 Sealed Conductor NA NA NA NA NA B-28 1853030 50029215100000 NA 1.1 NA 6.80 8/22/2009 B-29 2002090 50029215230100 NA 0.7 NA 6.80 8/21/2009 B-30 2011050 50029215420100 NA 0.2 NA 1.70 8/21/2009 B-31 1910460 50029221520000 NA 0.3 NA 1.70 8/20/2009 B-32 1991180 50029221650100 NA 0.3 NA 1.70 8/20/2009 B-33 1931450 50029223390100 NA 1.2 NA 8.50 8/21/2009 B-34 1930370 50029223520000 NA 1.2 NA 10.20 8/21/2009 B-35 1931460 50029224060000 NA 0.3 NA 1.70 8/20/2009 B-36 1960650 50029226670000 NA 0.3 NA 1.70 8/21/2009 B-37 2071450 50029233750000 Sealed Conductor NA NA NA NA NA B-21 (PTD #1821760) Internal Waiver Cancellation - Trouble Well e e Subject: ~,~21 (PT~ #1821760) !ntc:na~ Waiver ~ancellation - Troub,le ~Vcl.l, ~~; 2('(·7(D" From: "NSLJ, ADW Wel1 Integrity Engmeer" <NSUADWWcIlIntegntyEngmcer(g,JBP.com> Date: Thu, 23 Fcb 2006 10:07:41 -0900 To: "AOGCC - Winton Aubert (E-mail)" <winton_allbert(â.}admin.statc.ak.lIs>, jimJcgg@admin.statc.ak.us, "NSU, ADW Well Operations Supervisor" <NSLJADWWeIlOperationsSupcrvisor@BP.com>, "Rossberg, R Steven" <Steven.Rossberg@BP.com>, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com>, "Kurz, John" <john.kurz(f.,yBP.com>, "GPB, GC3 Wcllpad Lcad" <GPBGC3WellpadLead@BP.com> CC: "NSU, ADW Wel1 rntegrity Engineer" <NSUADWWellIntegrityEngineer@BP,com>. "NSU, ADW Wi Tcch" <NSUADWWITcch@BP.com>, "Derrick, George (Mackie) M" <dcrrgm@BP.com>, "Winslow, Jack L." <Lyonsw@BP.com>, "Subekti, Hcrry" <Herry.Subekti@BP.com> All, An internal waiver was issued for IAxOA communication on well 8-21 (PTO #1821760) on 12/12/05. The well has developed slow TxlA communication resulting in slow IA repressurization. The waiver has been cancelled due to the well no longer meeting waiver requirements. The well has been shut-in and is secured with a TTP. The well will be evaluated for options to mitigate the slow IA repressurization. The well is reclassified as a Trouble well. Please remove all waivered well signs and the laminated copy of the waiver from the wellhouse. Thank you, jlnna CDu6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 I:';... 1 of 1 2/27/200612:18 PM B-21 (PTD #1821760) Classified as Problem Well e e Subject: B-2 I (PTD #182 I 7(0) Classified as Problem Wcll From: "NSU, i\D\V Well Integrity Engineer" <NSUADWWcllIntegrityEngincer@BP.com> Date: Thu, 02 Fcb 200C> 10:33:23 -()900 To: "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com>. "Rossbcrg, R Steven" <Stcven.Rosshcrg@BP.com>, "NSU, ADW Well Operati.ons Supervisor" <NSlJADWWcIlOpcrationsSupervisor@ßP.com>, "GPB, Wells Opt Eng" <GPB W ellsOptEng@BP.com>, j im_regg@)admin.state.ak.us, wi nton _ aubert(~.l?adm in.state.ak. us, "NSLJ, ADW WL & Completion Supervisor" <NSUAD\VWL&CompletionSupcrvisor@BP.com>, "Kurz, John" ':.::iohn.kurz@BP.com>, "GPß, GC3 Wellpad Lead" <GPBGC3Wel1padLead@BP.com>, "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com>, "GPB, Prod Controllers" <:GPBProdControllers@ßP.com>, "Suhekti, Herry" <Herry.Subekti@BP.com> cc: "Hughes, Andrea (VECO)" <hugha4@}BP.com>, "Austin, Paul A" <Pau1.A.Austin@BP.com>, "J\SU, ADW Well Integrity Engineer" <NSUADWWelllntegrityEnginccr@BP.com>, "Holt, Ryan P (VECO)" <Ryan.Holt@BP.col11>, "MCCOLLUi'vl, CODY 0 (VECO)" <Cody.McCollum@BP.com>, "Winslow, Jack L." <Lyonsw@:BP.com>, "Frazier, Nicholas ß" <Nicholas.Frazicr@BP.com> All, Well 8-21 (PTD #1821760) has sustained casing pressure on the IA and has been classified as a Problem well. Wellhead pressures on 1/27/06 were 2300/1180/320. A TIFL failed on 1/28/06 due to IA repressurization. The plan forward for this well is as follows: 1. SL: DGL V in Sta #5 and #6 2. DHD: TIFL Attached is a wellbore schematic. Please call if you have any questions. Nick Frazier Wells Group PE 907-659-5766 fraznb@bp.com «B-21.pdf» Content-Description: B-21.pdf Content-Type: application/octet-stream Content-Encoding: base64 çcP IvWiP (; CZ7 (,f>5 :~ '55ß¿Jr7~ Q] II. z ~ to) ¿:A (;,~ Þ\.:P1?' 5\î~ f).-/ ok pú'. C04("1z. JK>17 z/'òID(, J-A ¿) p.. ll9:lJ(>í ~2òr'l 1 of I 2/6/20063:29 PM e 113-3/8" CSG, 72#, L80, 10 =: 12.347" I Minimum ID = 3.725" @ 9137' 4-1/2" OTIS XN NIPPLE I 5-1/2" TBG, 17#, L-80, .0232 bpf, 10 = 4.892" I 9042' ITOPOF7" LNR I 9105' 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I 9178' 19-5/8" CSG. 47#, L-BO, 10 = 8.681" I 9358' PERFORA TION SUMMARY REF LOG: DA-BHCA, 12/11/82 ANGLE AT TOP PERF: 17 @ 9610' Note: Refer to Production DB for historical perf data SIZE SPF INTER.V AL Opn/Sqz DA TE 3-3/8" 4 9610 - 9612 0 07/11/94 3-3/8" 6 9615 - 9623 0 07/30/95 3-3/8" 6 9627 - 9635 0 07/30/95 3-1/8" 4 9628 - 9670 S 02/05/92 3-3/8" 4 9640 - 9650 0 07/11/94 3-3/8" 4 9660 - 9670 S 07/08/94 3-3/8" 4 9680 - 9730 S 07/08/94 3-1/8" 4 9700 - 9760 S 02/05/92 I PBTD I 10198' 10132' I 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" DATE 12/16/82 10/04102 02/20/03 01/03/06 REV BY COMMENTS ORIGINAL COMPLETION BMlTP WAIVER SAFETY NOTE ITLH WAIVER SAFETY NOTE COMlPJC WAIVER SAFETY NOTE DATE 8-21 . I I SA NOTES: *** IA x OA COMM. OPERATING LIMITS: MAX lAP = 1000 PSI; MAX OAP = 1000 PSI (01/03/06 WAIVER) *** 2032' - 5-1/2" OTIS SSSV LANDING NIP, ID = 4.562" ST MD ND 6 3093 3011 5 5215 4908 4 6949 6329 3 8063 7304 2 8722 7920 1 8881 8070 GAS LIFT MANDRElS DEV TYPE VLV LATC 9 OTIS-LBD RA 33 OTIS-LBO RA 33 OTIS-LBO RA 23 OTIS-LBD RA 19 OTIS-LBO RA 19 OTIS-LBO RA DATE PORT 8952' - 5-1/2" OTIS XA SLIDING SL V, ID 4.562" I 9019' -i BKR SBR SEAL ASSY I 9042' -19-5/8" x 5-112" BKRSAB PKR,ID=4.0" 9096' - 4-1/2" OTIS X NIP, 10 = 3.813" I 9137' -14-1/2" OTIS XN NIP, ID = 3.725" I 9178' -14-1/2" TIL BKR SOS I 9181' H ElMDTILOGNOTAVAILABLE I REV BY COMMENTS 9745' - MARKERJOINT I PRUDHOE BA Y UNIT WElL: B-21 PERMIT No: "1821760 API No: 50-029-20850-00 SEC31, T11N, R14E BP Exploration (Alaska) .~. STATE OF ALASKA ~"-. ALASKA .JIL AND GAS CONSERVATION CL..,,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other CTD Prep-Work 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 674' SNL, 1896' WEL, Sec 31, T11N, R14E UPM At top of productive interval 1530' SNL, 4675' WEL, Sec 31, T11N, R14E UPM At effective depth 1461 SNL, 4880' WEL, Sec 31, T11N, R14E UPM At total depth 1456' SNL, 4894' WEL, Sec 31', T11 N, R14E UPM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 79.75 feet 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number B-21 9. Permit Number / Approval No. 82-176 10. APl Number 50-029-20850 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10200 feet true vertical BKB 9403 feet Effective depth: measured 10150 feet true vertical BKB 9355 feet Plugs (measured) Junk (measured) Cement Plug Top @ 9700' Casing Length Size Cemented MD Structural Conductor 110' 20"X30" 72 c.f. 146' Surface 2654' 13-3/8" 3720 c.f. 2690' Intermediate 9323' 9-5/8" 1398 c.f. 9359' Production Liner 1095' 7" 366 c.f. 9105' - 10200' Perforation depth: measured Open Perfs 9610'- 9612', 9615' - 9623', 9627'- 9635', 9640' - 9650' Sqzd Perfs 9635' - 9640', 9650' - 9670', 9680' - 9760' true vertical Open Perfs 8840' - 8842', 8845' - 8852', 8856' - 8864', 8869' - 8878' Sqzd Perfs 8864' - 8869', 8878' - 8897', 8907' - 8983' Tubing (size, grade, and measured depth) 5-1/2" L-80 tubing to 9042' with 4-1/2" tailpipe to 9180' Packers and SSSV (type and measured depth) 9-5/8" Baker (SAB) packer @ 9042', 5-1/2" Otis SSSVLN @ 2146'. TVD BKB 146' 2690' 8602' 8362'-9403' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 5. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ScottLaVo,e ,~--~"~~~/)"~ Title TechnicalAssistant Prepared By Name/Number: Date /_47.1o/ 'q DeWayne gc~n~r 564-5174 B Submit In Duplicate"-t~ Form 10-404 Rev. 06/15/88 NRIAII\iZ i B-21 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/15/2001 ANN-COMM: EVAL HIGH OA PRESSURE. SUMMARY 01/15/01 BLED OA FROM 1660 TO 200 PSI, OA F/L @ 90'. OA PRESSURE INCREASED 100 PSI IN 1 HOUR Fluids Pumped BBLS. 0.24 Description 10 GALS OF DIESEL. 0.24 TOTAL MEMORANDUM TO: Julie Heusser THRU: FROM: State of Alaska AlaSka Oil and Gas ConservatiOn Commission' Commissioner TOm Maunder, ~ P. I. Supervisor o\ Jeff Jones, Petroleum InSpector DATE: January 18, 2001 SUBJECT: Safety Valve Tests Prudhoe Bay Unit B Pad ThurSday, JanUary 18, 2001' I traveled t© BPXs B Pad and witnessed the'semi annual safety valve system testing. : ' i As the attached AOGcc Safety Valve System Test Report shoWs I witnessed the testing of 17 wells and 34 components with 2 failures. The. Pilot on well B-18 tripped below the required set pointand.the Pilot on Well B-21 was frozen. Both failures were rePaired andsUcessfully retested before I departed location. " The new Style Pil°t insulation box fabricated using Pipeline insulation installed on most wells on this pad shOUld be installed onthe remaining SVS pilots to eliminate the freeze up Problems ievident.on this pad. I als© inspected the well hOuses on this pad while witnessing SVS testing, All the well houses inspected were clean and the equipment appeared to be in good cOndition~ ~ summary: I witnessed the svS testing at BPXs PBU B Pad PBU B Pad, 17 wells 34 components 2 failures 5.8% failure rate 22 well house inspections~ · Attachment: SV$ PBU B Pad 1-18-01~JJ UnClassified Confidential Confidential (Unclassified if doc. removed ) SVS pBo B Pad 1-18-01 JJ.d°c Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Submitted By: Jeff Jones Field/Unit/Pad: pBF /PBU /B Pad Separator psi: LPS 174 Date: 1/18/01 HPS 658 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, G~J, Number Number PSI PSI T~p Code Code Code Passed CAS or CYCLE B.01 1700080 174 125 120 P P OIL !B-02A ' 1961110 658/174 550/125i500/120 P P OIL :B-03B 1870480 B-04 1700320 B-05A 1960990 ' B-06 1770740 174 125 120 P P OIL B-07 1780020 658 550 520 'P P OIL B-08 1780410 658/174 550/125 510/110 P :P OIL B-09 1780490 . B-10 1780540 174 125 110 P P OIL B-11 1780690 B'12A 1970090 658 550 530 ' P P OIL B-13A 1990570 _ B-14 1780930 B-15 1790190 B-16 1790250 B-t7 1790280 B-18 1820020 658 550; 0 3 P 1/18/01 OIL' ~B-19 1820030 174 125 120 P P OIL iB-20 1821680 174 125 120 P P OIL B-21 1821'760 -658 550 510 2 P 1/18/01 OIL !B-22 1820890 B,23A 1970590 658/174 550/125 550/120 p P OIL B-24 1821400 B-25 1821510 174 125 115 P P OIL B-26B 2000570 '174 1251' '125 P P OIL B-27A 1961010 658/174 550/125i520/125 p P OIL B'28 1853030 B-29 1860140. B-30 1860310 B-31 1910460 B-32A 1991180 - B-33A 1931450 174 '125 115 p p OIL B-34 1930370 - PI=LIT 1:1 P~tt 1_1 R.131 II ~~ ~1 r iii i Well Permit Separ Set L/P Test Test Test Date oil, WAa, ~J, Number Number PSI PSI Trip Code Code Code Passed CAS or CYCLE B-35 1931460 B-36 1960650658/174 550/125 540/120 P P OIL J-05B 2000180 Wells: 17 Failure Rate: 5.8% [] 90 Day Remarks: Components: 34 Failures: 2 The 2 failures were corrected and paSsed a retest. , ,, ,~"~, T~oo 9 ,,f9 ~VS PBU B Pad 1-18-01 JJ.xls STATE OF ALASKA ALASF'~-<3- IL AND GAS CONSERVATION COMMISSlC~-% REPORT G. SUNDRY WELL OPEr ATIONS 1. Operations performed: Operation shutdown __ Stimulate. Plugging Pull tubing Alter casing __ Repair well Perforate X Other 2. Name of Operator BP E,~ploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 674' SNL, 1896' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 1530' SNL, 4675' WEL, SEC. 31, T11N, R14E, UPM At effective depth 1461' SNL, 4880' WEL, SEC. 31, T11N, R 14E, UPM At total depth 1456' SNL, 4894' WEL, SEC. 31, T11N, R14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINA£ 6. Datum elevation (DF or KB) KBE = 79. 75 AMDL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-21 (12-31-11-14) PBU 9. Permit number/approval number 82-176 / 10. APl number 5O- 029-20850 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2654 Intermediate 9323 Production -- Liner 1095 Perforation depth: measured 10200 feet BKB 9403 feet 10150 feet BKB 9355 feet Plugs (measured) Junk (measured) Size Cemented Measured depth 146 2690 9359 20 x 30 8 c.y. 13 3/8 3720 c.f. 9 5/8 1398 c.f. 7 366 c.f. 9105-10200 9610'-9612', Sqzd 9628'-9640', 9640'-9650', Sqzd 9650'-9760' true vertical subsea 8760'-890Y (all intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 9042' with 4 1/2" tailpipe to 9180' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9042~ 5 1/2" SSSV at 2146' True vertical depth BKB 146 2690 8602 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1225 16219 1292 0 Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Ope~rations __ 16. Status of well classification as: Oil X Gas Suspended__ Service Si~"~ed,/"// Form 1'0-40, 5/vj,,,rtify that th~f6regoingzj's t,~be and correct to the best of my knowledge. ....... Title Technical Assistant III Rev 06/15/88 Date'S. ~,~(~ SUBMIT IN DUPLICATE 7/30/95 WELL B-21 (12-31-11-14) Addperf The following additional interval were perforated 3/8" guns, 6 SPF, random orientation and 60© phasing. using 3 7/30/95 9615'- 9623 MD' _ Reperf The following interval were reperforated using 3 guns, 6 SPF,random orientation and 60© phasing. 9627'-9635'MD 3/8" LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 3 August 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: DESCRIPTION - . 1. PLS/STP FINAL BL+RF 1 PLS/STP FINAL BL+RF ECC No. Run # ..1. 522.08 Run # 1 2011.01 1 PDK FINAL BL+RF Run # 1 1 PFC/PERF FINAL BL+RF Run # 1 1 PFC/PERF FINAL BL+RF Run # 1 5646.01 5718.08 5811.06 Received Please sign and return to: Attn. Rodney on ~ t~90Z~-780~n. '~ %//, ~ . ~ , ~-/ ~, ~- LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 6 April 1995 Transmittal of Data ECC #: 5718.07 Sent by: MAIL Data: LDWG Dear Sir/Madam, Reference: BP B-21 (12-31-11-14) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: ' ~"~ease sign and ~et~rn Pe%ro~e'chnical Data Cen%e~ 'BP Exploration (Alaska) 900 E~st Benson Boulevard LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 6 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL --73 - 2,3 c-o8' - DESCRIPTION 1 CCL/CUT FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS/STATIC FNL BL+RF 1 CN/GR FINAL BL+RF 1 PLS/STATIC FNL BL+RF ECC No. Run # 1 1811.02 Run # 1 3560.03 Run ~ 1 5643.02 Run ~ 1 5718.07 Run # I 6275.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: . . ..... l~, - ................ .- --------~' A;~;,,,. -""-"-~ora.e ~'/' ~-~-=s Cons·a Commission LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 28 March 1995 Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PLS/STP FINAL BL+RF' 1 PLS FINAL BL+RF 1 CCL FINAL BL+RF Run # 1 Run # 1 Run ~ 1 ECC No. 5603.06 5718.06 5780.06 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and return to; Pe%rotechnlcal Data  00 E~st ~'=~ ~°uieva'z~d - ~a~ 0il $ ~as Oon~. Commission ~chomge STATE OF ALASKA ALAS .K-"~IL AND GAS CONSERVATION COMMISSIO~'"~ REPORT Or-SUNDRY WELL OPEhATIONS 1. Operations performed: Operation shutdOwn Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 674' SNL, 1896' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 1530'SNL, 4675' WEL, SEC. 31, T11N, R14E, UPM At effective depth 1461' SNL, 4880' WEL, SEC. 31, T11N, R14E, UPM At total depth 1456'SNL, 4894' WEL, SEC. 31, T11N, R14E, UPM 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 79.75 AMDL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-21 (12-31-11-14) PBU 9. Permit number/approval number 82-176 ! 10. APl number 50- 029-20850 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2654 Intermediate 9323 Production -- Liner 1095 Perforation depth: measured 10200 feet Plugs (measured) BKB 9403 feet 10150 feet Junk (measured) BKB 9355 feet Size Cemented 20 x 30 8 c.y. 13 3/8 3720 c.f. 9 5/8 1398 c.f. Measured depth 146 2690 9359 7 366 c.f. 9105-10200 9610'-9612',Sqzd 9628'-9640',9640'-9650',Sqzd 9650'-9760' true vertical subsea 8760'-8903' (all intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 9042' with 4 1/2" tailpipe to 9180' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9042~ 5 1/2" SSSV at 2146' True vertical depth BKB 146 2690 8602 8362-9403 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure OCT 1 4 1994 Oil & Gas Cons. Comm~ion N~ch0ra.ja 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure SI - - 1225 '/ 16219 1292 0 Tubing Pressure 275 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed (~/~'~-~i ~ )~/~-'"' Title Senior Technica/Assistant/ Form 10-404'Rev 06/15/88 / Date SUBMIT IN DUPLICATE 7~8/94 7/11/94 WELL B-21(12-31-11-14) NRWO/Add Perf & Reperf Operations A WSO Cement Squeeze was performed using the following fluids: OPERATIONS SUMMARY 1. KILL WELL WITH 450 BBL FILTERED SEAWATER AT 6.5 BPM AND 1210 PSI FINAL WHP. 2. RIH WITH 3.5" CMT NZL, DRY TAG TD AT 9849 FT CTD, CORRECT TO 9841 Fl7 BKB. 3. JET ALL PERFS WITH 17 BBL OF 12 % HCL ACID / 20% XYLENE. 4. COOL DOWN SUMP WITH 163 BBLS FILTERED SEAWATER. 5. SQZ ALL PERFS WITH 24.5 BBL, 15.8 PPG "G" SLURRY, RAMPED SQZ TO 3000 PSI, PLACED 2.5 BBL BEHIND PIPE. SQZ TESTED OK AT 3000 PSI. 6. REVERSE IN FROM 8900 FT, FOUND SLURRY TOP AT 9250 FT. CONT. REVERSE IN HOLE AT 4-6 FPM. 7. MAKE JET PASSES. PRESSURE TEST SQUEEZE TO 2000 PSI FOR 10 MINUTES. HELD OK. 8. LEAVE 4000' GAS CAP ON WELL FOR LATER IN-FLOW TEST. FLUIDS PUMPED 450 BBLS 120 BBLS 17 BBLS 180 BBLS 24 BBLS 15 BBLS 62 BBLS 538 BBLS FILTERED SEAWATER TO KILt, WELL FSW WHILE RIH W/CT. 12% HCL ACID / 20% XYLENE TO WASH PERFS. FILTERED SEAWATER TO FLUSH AND COOLDOWN SUMP 15.8 PPG, "G" CEMENT SLURRY FRESH WATER SPEAR AND SPACER FILTERED SEAWATER TO SQZ WELL FILTERED SEAWATER TO REVERSE OUT CMT, JET AND REVERSE OUT AGAIN. The following added interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 60°/120° phasing. 9610' - 9612' MD 9640' - 9650' MD Reperf RECEIVED OCT 1 4 1994 Alaska Oil & Gas Cons. Commission Please sign and return to: Petrotechnical Data ~-"ter BP Exploration (Alaska) Ine 900 East Benson Boulevard Anchorage, Alaska 99508 Received by. m~uST~fLASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 19 July 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. D-il ~ SPNR/TEMP FINAL BL Run # 1 5617.08 1 SPNR/TEMP RF SEPIA Run # 1 B-05 (41-32-11-~4) Z-12 (21-30-11-12) E-13 (01-11-13) B-21 (12-31-11-14) B-29 (32-31-11-14) g~""'~)5 H-22 (21-11-13) ~;,0'""gg/1¢ E-11 (33-32-12-14) ~-~OLL~/TUB FINAL BL COLLAR/TUB RF SEPIA PFC/PERF FINAL BL PFC/PERF RF SEPIA PFC/PERF RF SEPIA /PFC/PERF FINAL BL PFC/PERF RF SEPIA PLS S~HT~C FINAL BL PLS SEPIA PFC/PEW SEPIA /~iPOL/CCL FINAL BL POL/CCL RF SEPIA Run # 1 5862.03 Run # 1 Run # 1 4031.04 Run # 1 Run # 1 5955.03 Run # 1 Run # 1 5718.05 Run # 1 Run # 1 5818.06 Run # 1 Run # 1 6016.04 Run # 1 Run # 1 3060.03 Run Please sign and return to, Atlas Wirelike Services 5600 B Stree= su t. · Anchorage, AK 99518 · Attn. Rodney D. Paulson Received by: Date: ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 16 May 1994 RE: Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL c-29 DESCRIPTION 1 CN/GR LDWG TAPE+LIST ECC No. Run # 1 2352.02 ~2-1~ B-21 (12-31-11-14) 8&-lq B-29 (32-31-11-14) (1.3-34-12-13) 1 CN/GR LDWG TAPE+LIST 1 CN/GR LDWG TAPE+LIST 1 PDK/GR LDWG TAPE+LST Run ~ 1 5718.04 Run # 1 5818.03 Run # 1 6083.06 ~--~l B-12 1 CN/GR LDWG TAPE+LIST Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Run ~ 1 5791.02 Received by: Please sign and return to: Petrotechnical Data Center BP Exploration (Alaska) Inc 900 East Benson Boulevard Anchorage, Alaska 99508 Received by _ 5:" . . · _ Date ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 11 May 1994 RE: Transmittal of Data Sent by: ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 3-43/P-36 (SDI) 3-43/P-36 (SDI) ' /~S~TI~RlCC= FINAL ~r. 1 SBT/GR/CCL RF SEPIA _ /PFC/~R/CC~. FZ~AL ~r. w 1 PFC/GR/CCL RF SEPIA ECC No. Run ~ 1 6192.01 Run # 1 S-31 Run ~ '1 6192.02 Run # 1 D-11 i .~L INJPROF. FINAL BL Run # 1 PL INJPROF. RF SEPIA Run # 1 A-9 B-12 1 PL GASENTR¥ FINAL BL' Run ~ 1 PL GASENTRY RF SEPIA Run # 1 '"PFC/GR/CCL FINAL BL Run # 1 PFC/GR/CCL RF SEPIA Run # 1 X-29 (21-12-10-13) C-29 CN/GRFINAL BL # Run 1 1 CN/GR FINAL RF SEPIA Run ~ 1 PL STATIC FINAL BL PL STATIC RF SEPIA CN/GR FINAL BL' CN/GR FINAL RF. SEPIA Run ~ 1 · Run # 1 Run Run- B-21 (12-31-11-14) Cont/ $:CN/GR FINAL B~ Run ~ 1 -/1 CN/GR FINAL RF SEPIA Run # 1 5188.01 5617.06 5694.03 5791.02 6139.04 2352.02 5718.04 STATE OF ALASKA ~ ~,. AU--.-..,KA OIL AND GAS CONSERVATION COMMIS~,.JN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 6. Datum elevation (DF or KB) \1 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 674' SNL, 1896' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 1530' SNL, 4675' WEL, SEC. 31, T11N, R14E, UPM At effective depth 1461' SNL, 4680' WEL, SEC. 31, T11N, R14E, UPM At total depth 1456' SNL, 4694' WEL, SEC. 31, T11N, R14E, UPM 5. Type of Well: Development X KBE = 79.75 AMDL feet Exploratory Stratigraphic 7. Unit or Property name Serv~e Prudhoe Bay Unit 8. Well number B-21 (12-31-11-14) PBU 9. Permit number/approval number 82-176 / 10. APl number 50- 029-20850 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural - Conductor 110 Surface 2654 Intermediate 9323 Production -- Liner 1095 Perforation depth: measured 10200 feet BKB 9403 feet 10150 feet BKB 9355 feet Plugs (measured) Junk (measured) Size Cemented Measured depth True vertical depth BKB 20 x 30 8 c.y. 146 146 13 3/8 3720 c.f. 2690 2690 9 5/8 1398 c.f. 9359 8602 7 9628'- 9670', 9700'- 9760' 366 c.f. 9105-10200 8362-9403 true vertical subsea 8778'- 8903' (two intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 to 9042' with 4 1/2" taiipipe to 9180' Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9042'; 5 1/2" SSSV at 2146' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 360 ~ 3492 244 0 710 1667 1662 1141 Tubing Pressure 2O39 224 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations 16. Status of well classification as: Oil X . Gas Suspended Service 17. I hereby certify tha,,t the forecjoing is true and correct to the best of my knowledge. Signed~' A~.!.~ (/"-)j ")P/C.z/W.~ Title Senior TechnicalAssistantl Form 10-~'-0J~ ~ev 06/1-5/88 7 ' Date SUBMIT IN DILIPLI(~ATE 2/05/92 2/10/92 10/1-3/92 WELL B-21(12-31-11-14) NRWO/Reperf A NRWO was performed using the following fluids: 538 bbls PW to Load Well and Cool Sump 5 bbls EW 25 bbls ACID 7 bbls EW 25 bbls PW(CT Displacement) 75 bbls PW(ACID Overflush) 29 bbls PW(Cool Sump) 5 bbls EW (Preflush) 27 bbls Cement 5 bbls KW(Spacer) 20 bbls PW 41 bbls Duo Polymer(Contaminant) 32 bbls PW(Displacement) 219 bbls PW(Reverse Out) 29 bbls MEOH(FP while Nozzle Plugged) 79 bbls PW(Jet Pass) 50 bbls MEOH(Freeze Protection Well) 35 bbls MEOH(Freeze Protection CT) Well Cleaned Out to 10111' 350 bbls load fluid behind pipe(Cumulative Approximate Total Load Fluid Behind Pipe is 350 bbls) 20 bbls Cement Recovered(Does Not Include Cement not pumped) ACID: 12%HCL W/20% XYLENE, 1% WS-36, .4% HAI-85, 45 PPT FERCHEK-A CEMENT: 15.5 PPG CLASS G CEMENT CONTAINING, .2% CFR-3, .018% HR-12, .18 GAL/SK HALAD-344L SQz #1 The following interval were reperforated using 3 3/8" guns, 4 SPF, 60° orientation and 120° phasing. 9680'-9700' MD 9700'-9725' MD 9725'-9750' MD A NRWO (WSO) was performed using the following fluids: FLUIDS 407 BBLS SW W/50 PPM DETPMP AND .Z% NE-18 TO LOAD WELL 13 BBLS 17 PPG BIOZAN 40 BBLS SW 15 BBLS ACID 75 BBLS SW DISPLACEMENT AND OVER FLUSH 218 BBLS SW TO COOL SUMP 35 BBLS MEOH (FREEZE PROTECTION CT) 330 BBLS SW W/.?_.°A NE-18 TO LOAD WELL 240 BBLS SW TO COOL SUMP 5 BBLS FW (PREFLUSH) 30 BBLS EDTA (PREFLUSH) 15 BBLS CEMENT 18 BBLS FW (SPACER) 56 BBLS SW (DISPLACEMENT) 10 BBLS MEOH DOWN BACK SIDE WHILE PUMPING EDTA AND 204 BBLS SW (LIVE REVERSE OUT) 19 BBLS SW (JET PASS) 33 BBLS MEOH (FREEZE PROTECTION CT) /~ U G ~ ti i~[}~ Alash.Oil.& Gas Cons..CommissiOn chOrage PAGE 2 WELL B-21(12-31-11-14) 1 4 BBLS MEOH (FREEZE PROTECTION WELL) 57 BBLS MEOH (FREEZE PROTECTION FLOWLINE) WELL CLEANED OUT TO 9820' 1 230 BBLS LOAD FLUID BEHIND PIPE TODAY(APPROX TOTAL IS 1 230 BBLS) 11 BBLS CEMENT RECOVERED (DOES NOT INCLUDE CEMENT NOT PUMPED) 0 BBLS CEMENT LEFT IN LINER ACID (HALLIBURTON) 12% HCL W/10% XYLENE 1% WS-36 0.5% HAl-85 45 PPT FERCHEK-A EDTA(HALLIBURTON) 2.5% EDTA 2.5% KCL 1 6% MUSOL 0.5% LS-300 CEMENT ARC (HALLIBURTON) 16.1 PPG PREMIUM CEMENT 0.5% HR-12 0.2% CFR-3 1.0% BENTONITE 1.20 GPS LATEX 2000 344 L 0.18 GPS 434B .05 GPS D-AIR-3 .05 GPS HALAD 344L SQZ #1 CEMENT(HALLIBURTON) 15.5 PPG CLASS GCEMENT CONTAINING 0.2% CFR-3 0.15% HR-12 0.2% LWL 0.18 GAL/SK HALAD- 10/05/92 A NRWO was performed using the following fluids: FLUIDS 138 BBLS SW TO LOAD WELL 8 BBLS ACID 80 BBLS SW 356 BBLS SW TO COOL SUMP 5 BBLS FW (PREFLUSH) 15 BBLS CEMENT 18 BBLS FW (SPACER) 25 BBLS SW (DISPLACEMENT) 24 BBLS DUO POLYMER(CONTAMINANT) 44 BBLS SW (DISPLACEMENT) 250 BBLS SW (REVERSE OUT) 60 BBLS SW (JET PASS) 75 BBLS RECOVERED (FINAL REVERSE OUT AND LIFT GAS DISPLACEMENT) 35 BBLS MEOH (FREEZE PROTECTION CT) WELL CLEANED OUT TO 9832' 1 4 BBLS CEMENT RECOVERED (DOES NOT INCLUDE CEMENT NOT PUMPED) ACID (DOWELL) 15% HCL 0.7% A-260 0.2% F-75 0.5% W-54 20# L-58/1000 GAL SQ.Z #2 CEMENT (DOWELL) 15.8 PPG CLASS "G" CMT CONTAINING 0.1 GAL/SK D47 0.5% D20 0.5% D65 0.1 GAL/SK D 135 0.8% D800 0.65% D156 AlaSk Oit E GaS Gous. PAGE 3 10/08/92 11/09/92 WELL B-21(12-31-11-14) The following interval were reperforated using 3 3/8" guns, 4 SPF, 45° orientation and 90° phasing. 9706'- 9730' MD 9686' - 9706' MD 9680' - 9686' MD The following additional interval were perforated using 3 3/8" guns, 4 SPF, 45° orientation and 90° phasing. 9660' - 9670' MD fjh 12/13/92 RECEIVED A~J$ 2 ~ t99~ Oil .& (las .Cona..Commission BP EXPLORATION RECEIVED BP Exploration (Alaska) Inc. g00 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 11/16/92 T# 84059 BP LOGS Endlosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-12 ~,-I/~ PRODUCTION LOG 11/07/92 91/ 8750.00- 9250.00 ATLAS 5 " A-18~l-fo~ CCL(C~e~t~ ¢~'~.~1/10/92 #1~ 8100.00- 9270.00 ATLAS 5 " B-21~Z-I?~ PFC/~(~6~W) 11/_Q9/92 #1~ 9400.00- 9824.00 ATLAS 5 " M-15~/-~CCL (P~K-,~/e*~.9~/f~f~8/92 91~ 8500.00- 9330.00 ATLAS 5 " R-29~-~/. PFC/~ (~) 11/10/92 #1u/ 10140.00-10320.00 ATLAS 5 " R-30 ~-~{& PRODUCTION LOG -11/08/92 #1 / 11100.00-11550.00 ATLAS 5 " .......... (f~$311/11/92 #1~/ 9620 00- 9720 00 ATLAS 5 " S-07A=,,~--/~ ........... - · · Information Control Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 // (907) 561-5111 DATE: 10/27/92 T# 83999 BP CASED HOLE PRODUCTION LOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at A 33~5''/~3 ~$ utF~ Suave/ - LEAK DET~&T~u/9 09/15/92 #1~'/ B-10~-~ PROD.~.~'~ ~ 09/11/92 ~1~ B-218Z~Ig~ PAOD,~- ~ 09/12/92 91 ~ B-22 g~ ~~~~/9/15/92 ~1 / x-2~-~g ~0~.~[~ 09/09/92 ~ / below. If you have any (907) 564-4004. 1000.00-11112.00 CAMCO 2 " 10200.00-10439.00 CAMCO 5 " 8828.00-10000.00 CAMCO 5 " 10800.00-11080.00 CAMCO 5 " 2050.00-10780.00 CAMCO 2/5" Information Control Well Records RECEIVED OCT 2 9 1992 Alaska Oil & Gas Cons. Commiss[or~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/13/92 T# 83974 BP CH Logs Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-04 7$'~ PERF 10/08/92 #1 10/08/92 #1 11117.00-11140.00 SCH 5 " 9560.00- 9817.00 ATLAS 5 " Information Control Well Records ECEIVED 0CT 1 6 1992 Alaska 0il & Gas Cons. Commission Anchorage "-'"- STATE OF ALASKA ~'-'" REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown .. Stimulate × Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska)/nc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 674'SNL, 1896' WEL, SEC. 31, T11N, R14E, UPM At top of productive interval 1530'SNL, 4675' WEL, SEC. 31, T11N, R14E, UPM At effective depth 1461'SNL, 4880' WEL, SEC. 31, T11N, R14E, UPM At total depth 1456' SNL, 4894' WEL, SEC. 31, T11N, R14E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB 5. Type of Well: Development Exploratory Stratigraphic Service 10200feet Plugs (measured) 9403feet 10150feet Junk (measured) 9355feet 6. Datum elevation (DF or KB) KBE = 79.75 AMDL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number B-21 (12-31-11-14) PBU 9. Permit number/approval number 82-176/ 10. APl number 50- 029-20850 11. Field/Pool Prudhoe Oil Pool Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20 x 30 8 c.y. 146 146 Surface 2654 13 3/8 3720 c.f. 2690 2690 Intermediate 9323 9 5/8 1398 c.f. 9359 8602 Production -- Liner 1095 7 366 c.f. 9105-10200 8362-9403 Perforation depth: measured 9628'- 9670', 9700'- 9760' true vertical subsea ~ E C E i V E D 8778'- 8903' (two intervals) Tubing (size, grade, and measured depth) 5 1/2"L-80 to 9042' with 4 l/2'tai/pipe to 9180' S E p _ 8 392 Packers and SSSV (type and measured depth) 9 5/8" Bakerpacker at 9042'; 5 1/2" SSSV at 2141~.]a~k~ .Oil.& Gas Con.~ r,,,,..,.,__. 13. Stimulation or cement squeeze summary 11/21/91 HCL ACID Treatment .---,,-,JJ_,_ ~,~l_u_ Intervals treated (measured) 9700'- 9760' 346 bbls Seawater, 29 bbls Diesel, 87 bbis Methanol 143 15% Treatment description including volumes used and final pressure HCL .4% A-260, 1% F-78,.5% W-54, 251b/1000 gal L-58, 48 bbls Sea Water w/10% U-lO0 and 1% f-78,143 SeaWater w/1% F- 78 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 230 2457 448 0 290 2807 542 0 Tubing Pressure 2125 1756 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my_knowledge. . . _ Signed~ ,0 ) ' Ct,q,-~¢ Title ..~p. cr.'~c, cr Wctcff.!ss~-,;-;/~;b:_~ F/~_~J- Date Form 10-404 Rev 06/15/88 / SUBMIT IN DUPLI~'ATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 DATE: 02/19/92 T~ 83261 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. '/Y-28 ~ PDK-100' ¥-23 H-15 PFC B-2 H-18 ~Z'~~ PLS 5 " 02/13/92 #1 9100.00- 9430.00 ATLAS 5 " 02/12/92 #1 11160.00-11325.00 ATLAS 5 " 02/10/92 #1 11250.00-11528.00 ATLAS 5 " 02/10/92 #1 9582.00- 9852.00 SCH 5 " 02/11/92 #1 11500.00-11973.00 SCH 5 " 02/12/92 #1 9250.00- 9600.00 ATLAS Information Control Well Records Adrian J. Martin BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/23/92 T# 83203 BP MAGNETIC LIS TAPES Enclosed is your copy of the materials listed below. questions, please contact BP Welt Records at (907) Z-20 CH/TDT-P 10693.00-11544.00 API#500292185900 B-21 CH/TDT-P 9342.00-10124.00 API#500292085000 FIN 1600BPI 8368->TP# 12/28/91 #1 FIN 12/16/91 1600BPI 8369->TP# #1 If you have any 564-4004. SCH REF#92004 SCH REF#75334 Information Control Well Records Adrian J. Martin RECEIVED dAN 2 9 1992 Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/30/91 Tf 83137 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. v W-25 .~/ TDT-P  io,/~-26 ¢ PDK-100 %3-/~%-21 ~ TDT-P ~O~'~''~ W- 16 '// TUB ING CUTTER ~/;-~$/~-~7 ~. CML ~ ~-~7 ~ PERF ~/~/~R-16 ~ PERF ~/ ~~ PERF ~w//s 17 3 CL ~' ~%J-15 Z PERF ~I"[W-ll ~ BRIDGE PLUG ~ ~ ~ PACKER SETTING 5 " 5 " 12/18/91 f2 12/13/91 fl 12/14/91 fl 12/16/91 fl 12/16/91 fl 12/15/91 fl 12/17/91 fl 10/07/91 fl 10/27/91 fl 11/06/91 fl 11/05/91 fl 10/06/91 fl 11/04/91 fl 09/30/91 fl 11/30/91 fl 09/23/91 fl 11/18/91 fl 12/18/91 fl 10050.00-10539.00 SCH 5 " 11195.00-11374.00 ATLAS 5 " 10800.00-11522.00 ATLAS 5 " 9350.00-10097.00 SCH 5 " 10400.00-11100.00 SCH 5 " 9850.00-10536.00 SCH 5 " 10250.00-11173.00 SCH 5 " 10350.00-10889.00 HLS 5 " 10620.00-11666.00 HLS 5 " 10278.00-11579.00 HLS 5 " 8530.00- 9420.00 HLS 5 " 9263.00- 9431.00 HLS 5 " 8100.00- 8285.00 HLS 5 " 9170.00-10033.00 HLS 5 " 11800.00-12475.00 HLS 5 " 11123.00-11447.00 HLS 5 " 12593.00-12734.00 HLS 5 " 8760.00- 9110.00 SCH 10/27/91 fl 10620.00-11666.00 HLS Information Control Well Records Adrian J. Martin RECEIVED JAN 0 8 199Z Alaska Oil & Gas Cons, Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 RECEIVED OCT 1 8 199l ~aska Oil & Gas Cons. Commission Anchorage BP CASED HOLE FIN~_LS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well . Records at (907) 564-4004. . DATE: 10/10/91 T~ 82910 w-ii PITS 09/20/91 PITS 09/07/91 CCL 09/16/91 CCL 09/16/91 CCL 09/25/91 GAS LIFT SURVEY 09/15/91 PROD-F 08/13/91 GAS LIFT SURVEY 09/16/91 INJ 09/24/91 CL 09/07/91 INJ 09/11/91 PROD-F 08/24/91 GR 09/11/91 PROD-F 09/25/91 LEAK DET 09/19/91 PROD-F 08/20/91 TEMP 09/15/91 PROD-F 08/24/91 CL 09/04/91 LEAK DET 08/23/91 LEAK DET 08/23/91 GAS LIFT SURVEY 09/04/91 PROD-F 09/25/91 PROD-F 09/15/91 CL 09/15/91 TEMP 09/03/91 PROD-F 08/26/91 GAS LIFT SURVEY 08/26/91 INJ 09/06/91 JEWELRY LOG CAMCO 5 JEWELRY LOG CAMCO 5 CAMCO 5 ~1 10860.00 ~1 10800.00 ~1 8650.000 ~1 10131.00 ~1 9000.000 ~1 200.0000 ~1 9550.000 #1 5400.000 #1 9150.000 #1 9100.000 ~1 9800.000 #1 11000.00 #! 14200.00 #1 12450.00 #1 2000.000 #1 10350.00 #1 10275.00 #1 10350.00 #1 10200.00 #1 7992.000 #1 11800.00 #1 3200.000 #1 9250.000 #1 9800.000 #1 9500.000 #1 11800.00 #1 10850.00 #1 2500.000 #1 10240.00 08/22/91 #1 08/21/91 #1 08/23/91 #1 10900. 12550. 9950.0 11444.00 CAMCO 11140.00 CAMCO 9240.000 CAMCO 12500.00 CAMCO 9755.000 CAMCO 4000.000 CAMCO 98~0.000 CAMCO 10986.00 CAMCO 9680.000 CAMCO 10941.00 CAMCO 10279.00 CAMCO 11480.00 CAMCO 15162.00 CAMCO 12685.00 CAMCO 11270.00 CAMCO 10720.00 CAMCO 10953.00 CAMCO 10660.00 CAMCO 10522.00 CAMCO 9062.000 CAMCO 12553.00 CAMCO 8639.000 CAMCO 9722.000 CAMCO 10100.00 CAMCO 10224.00 CAMCO 12175.00 CAMCO 11150.00 CAMCO 9821.000 CAMCO 10807.00 CAMCO 00 11758.00 00 13284.00 00 10120.00 5 5 5 5 5 2 5 5 5 5 5 5 5 5 2/5 5 5 5 5 5 5 5 5 5 5 5 5 2/5 5 EXPLORATION TO: Distribution 8P EXploration (Alaska)/nc. 900 East 8enson 8OUlevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 From: Information Control Well Records LR2-1 Date: 01/02/90 Transmittal: 80750 SUbject: E-O1 Z-12 EnClosed is YOUr Copy of the material listed below. If questions, Please contact Bp Well Records at (907) 564-4445. You *save B-24 PROD-F PROD-F 12/24/89 #1 9500-9959 PERF 12/25/89 #1 10300-10619 Sc,5 PERF 12/22/89 #1 $ · Sch 5 · 12/23/89 #1 9300-9714 Sch $, PROD & PITs 12/21/R9 10250-10538 Sch ' ~ #! 11100-11407 5" Sc,5 any DistribUtion: ARCo CHEVRON EXXON GEOscIENCEs HOUSTON MOBIL PHILLIPS ARCHIVEs RE .EIV'ED JAN - 3 Slandard Alaska Produclion Company 900 East Benson E~,oule~,ord P O Bo. 196612 Af~chorage. Alosko 99.519 6612 ;907! .564-5! I I HOUSTON ARCO CHEVRON EYCfON TEXACO TO: biO B I L REFERENCE: PHi'LLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ' ',/,", pPF-'~r";! !(-' Tl.~h~i ~:,L/'~S,...,-, ...... u...,,_. ...... Date: 11-04-88 r#: 79498 B-21 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this-letter and returning it to this office: CNL-GR (2½" Tool) 10-30-88 #1 9300-10120 Sch 5" Received Da te A un,I O| lhe Or,(J,nOI 5'ondo,'d Gl ~o~ndcd ~ (le.~lond. C)6,o. ,~ 1870 Shirley R. McCurry I NFORMu~T I ON CONTROL Wel I Records LR2-1 Standard Alaska Produc lion Compa~ gO0 EO$1 8enson P.O. ~ Ancho~oge. AIo~ko (907) 564-51 I I ARCO SI'AN D/%RD .AI_AS~v-~ PRc')DI_JC'~ ION EXXON Date: 11/09/88 PHILLIPS ~: 79511 STATE OF AK SYSTEMS (Transmittal & Tape) ARCHIVES REFEPd~kK~E: SAPC biAGNETI~C LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: B-21 CH/CNL 3 Passes 10/30/88 #I 9296-10137 Tape Pos.#06146 Sch#72998 1600bpi API#50-029-20850 F-08 CH/CNL 4 Passes 2.5" 10/30/88 #I 10477-11257.5 Tape Pos.#06147 Sch#72988 1600bpi API#50-029-20i35 ARCHVIES ONLY: B-21 CH/CNL field tape Sch#72998 800bpi F-08 CH/CNL field tape Sch#72988 800bpi 10/30/88 #I Tape Pos.#06148 API#50-029-20850 10/30/88 #I Tape Pos. #06149 API#50-029-20135 * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company.~l~e_co_nfirm this. Received Date ~.;a~ ~ ~-nr.l~n ,,-~ '~:%'~ ~i~~~ Founded ,,~ (le.elo,,d ~,o .,, 1810 Jennifer Dietz IN~O~MATION O~V~ROL Well Records LR2-1 SOHIO ALASKA pETROLEUM cOMPANY TO: SFO ARCO_ EXXON. pHILLIPS. CENTRAL FILES~ 3111 "C" sTREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 4-10-84 Date: 75197 CC#: REFERENCE: OHIO MAGNETIC LIS TAPES & LISTINGS . The .... nih~ it to this otncu.- f this letter ano [e~u, ~ SF o/UNIT/STATE: B. 21 ~West End Test Well 11-29-83 3-3-84 TDT-EDIT w/ Listing TDT-M LIS w/ Listing map~ pos.' sch ~68869 C.H. 02920 sch ~69049 C.H. 02922 *SFO & EXXON: An Asteri-sk-(*) next to a listing abouve means you should have received the Tape(s) and Listing(s) directly from the respective service company- Carolyn Bishop Please confirm this .... Development Geology RECEWED Well Records DATE (4/8% SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON 3111 '°C" STREET ANCHORAGE, ALASKA TELEPHONE 19071 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: SFO/UNIT/STATE: GETTY Date: 2-29-84 (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) ~~OHIO CASED HOLE FINAL LOGS The material is submitted herewith. Please receipt a following being acknowledge by signing copy of this letter and returning it to this office:-- CC#: 75074 SFO/UNIT/STATE: B-20 ~ TD~-M 11-28-83 ~1 9300-9~04 Sdn 5" B-21 ~- TDT-M 11-29-83 #1 9250-10138 Sch 5" C-23 .~--~-TDT-M 11-27-83 #1 9500-13298 Sch 5" C-24 '~ TDT-M 11-26-83 #1 9650-10576 Sch 5" D-18~ TDT-M 11-24-83 #1 10400-11364 Sch 5" D-20 '- TDT-M 11-23-83 #1 9450-10440 Sdl 5" D-23~- TDT-M 11-25-83 #1 9700-10537 Sch 5" (4/82) DATE 19 Carolyn Bishop Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY TO: SFO ARCO CHEVRON EXXON GETTY MARATHON MOBIL PHILLIPS STATE OF ALASKA BPAE (Transmittal Only) CENTRAL FILES (CC#'S Transmittal only) 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE {907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 12/21/83 CC#: 74909 REFERENCE: TELECO MAGNETIC DIRECTIONAL SURVEY (S) - The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- K-2A'~ K-6~ K-7/ West End Test Well Teleco Magnetic Survey Job # 318-G 9/06-21/83 " " " Job # 335-AK 11/06-12/83 " " " Job # 338-AK 11/21-27/83 " " " Job # 337-AK 11/20-27/83 State Only: / B-21 ~/ Teleco Magnetic Survey Job # 202-AK 12/03-13/83 RECEIVED DAli ] 9 Victoria Aldridge Wells Records Dept. Development Geology TP1-5 TP1-5 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 31 11 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: SFO/UNIT/STATE: GETTY (-Marathon) MOBIL Date: 8/29/83 PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmittal Only) CCI/: 74682 REFERENCE: IO CASE___~D HO___LE FINAL LOGS ollowing material is being submitted herewith. Please acknowledge receipt by signing a of this letter and returning it to this office:- SFO/UNIT / STATE: B-21 Spinner 7/30/83 #1 9400-9900 Otis 5" (4/82) REC,,VEO .... '~.Z_ _ ,_~.'-~-'Cj~---~--- Victoria Aldridge TP1-5 ©~:~ 0 6 ~'}~%~-"q~evelopment Geology OAr6 .................................... 19 Aiaska. Oii& Gas Co~s~- oomm]ssion" . Well Records Anchorage SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO - CHEVRON 31 1 1 "C" STREET ANCHORAGE, ALASKA TELEPHONE {907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 fo: SFO/UNZT/sTAzE: (-Marathon) EXXON GETTY MOBIL PHILLIPS 8/16/83 Date: Trans. #: - 74652 CC#: STATE BPAE (Transmittal Only) _ CENTRAL FILES (CC#'s - Transmittal Only), REFERENCE: S~__~ FINAL DATA - PRESSURE SURVEY DATA /The following material is be~d herewith. Please acknowledge receipt by signing a ~--/ copy of this letter and returning it to this office:-- B-18/ Pressure Survey & BHPD B-19-- " " " " B-20 / " " " " B-21/ " " " " B_22~/ ,, ,, ,, ,, B_23/ ,, ,, ,, ,, D-16j Static Report D-21 " " D_22j ,, ,, D_23 .~/ ,, ,, M-5'j Pressure SUrvey X-7w Pressure Survey & BHPD 7/18/83 Camco 7/26/83 Otis 7/28/83 Otis 7/30/83 Otis 7/17/83 Otis 7/16/83 Camco 7/27/83 Camco 8/01/83 Camco 8/08/83 Camco 8/04/83 Camco 8/03/83 Otis 7/24/83 GO ',/82) RECEIVED DATE '6: ~-~'~b~: _...~ ~ : Victoria Aldridge Development Geology .'~9 '~ '":;'~:~'":Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 July 25, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well B-21 (12-31-11-14) PBU Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Enclosures cc: J. D. Hartz Geology Well File 917 Yo District Petroleum Engineer jUL ~. ? ~.~3 0il & Gas Cons. Cornrnissior~ STATE OF ALASKA ~'~" ~ ALASKA OIL AND GAS CONSERVATION COM:VllSSlON W_ELL COMPLETION OR RECOMPLETION REPORT AND LOG- 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-176 3. Address - 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20850 4. Location of well at surface 9. Unit or Lease Name Prudhoe Bay Unit 674' SNL, 1896' W-EL, Sec. 31, Ti'iN, R14E, UPM At Top Producing Interval top of Sag R. Sst. 10. Well Number 1534' SNL, 4661' WEL, Sec. 31, TllN, R14E, UPM B-21 (12-31-11-14) PBU At Total Depth 11. Field and Pool 1456' SNL. 4894' WRL. Sec. 31. TllN. R]4R, TJPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 79.75' AMSL ADL 28310 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 11--26--82 12--11--82 12--16--82 feet MSLI one 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost L0200'MD 9403'TVD 10150'MD 9355'TVD YES~ NO [] 2146 feet MDI 2095 ' 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR/FDC/CNL/CAL, HDT, CBL, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ;.O"x.q0" 'n~u]a~d ~_ond,~or .qurOa~ 110 ' 36" 8 cu.yds, concrete 13 3/8" 72# L-80 Surface 2690' 17 1/2" 3720 cu. ft. Permafrost II 9 5/8" 479 L-80 Surface 9359' 12 1/4" 1268 cu. ft. Class G; 130 cu. ft. Permafrost C 7" 26# L-80 9105' 10200' 8 1/2" 366 cu. ft. Class G ~/18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD MD ~¢J)ss SIZE DEP:I-H SET (MD) PACKER SET (I~ID) interval, size and number) __ Prudhoe Oil Pool Top: 9628' 8778' Bottom: 9760 ' 8903 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9628' -9670' BKB (8778! -8818' ~v'Dss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9700' - 9760' Bt~ (8846' - '8903' ~¢Dss) · 27. PRODUCTION TEST Dare,First Production ' - I Method of Operation (FIowing,.gas lift, etc.) July 3, 1983I Flowing .. Date °f Test_ IH°ursTested TEsTPRODUCTIONFOR OIL-BBLpERiOD ~ GAS-M~F WATER-BBL CHOKESIZE IGAS-OILRATIO Press.Fl°vcT-ubingIICasing Pressure -, 24-HOUR.-RATECALCULATED I~' OI.L-BBL GAS-MCF WATER-BBL . OIL GRAVITY-APl (corr) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .One. ' -.. JUL 2 ? · Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 3O. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval te~ted, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB -- Subsea:- Sag. R. SST. 9394' 8555' . Shublik 9416 ' 8576 ' -_ Ivishak 9441' 8600' , 31. LIST OF ATTACHMFTN-TS / / 32. , hereby .e~i~,~he for~oi.g is~/ue,,d corr~t to ,he b,, 6f my k, ow.edge Si9 ~'~_ Titl~Dist.Eno inp~Petr°leUmr Date " ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item .16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in-item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- '; ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ~-~ STATE OF ALASKA ALASKA ....L AND GAS CONSERVATION C ;/IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL 2. Name of Operator Sohio Alaska Petroleum Company 3. Address Pouch 6-6i.2, Anchorage, Alaska 99502 4. Location of Well At Surface: 674' SNL, 1896' WEL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 79.75' AMSL 6. Lease Designation and Serial No. ADL 28310 OTHER I--] 7. Permit No. 82--176 8. APl Number 50-- 029--20850 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number B-21 (12-31-11-14) PBO 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF.' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] . Perforations ~ Altering Casing I-'] Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other I'-I Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.). 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals were perforated July 3, 1983, using Dresser Atlas 3 3/8" Jumbo Jets at 4 s.p.f. A lubricator was installed and tested to 3500 psi on all well work. 9628' - 9670' BKB (Ref. BHCA/GR, 12-11-82) 9700' - 9760' BKB ( " ) An SSSV was set and tested in the ball valve nipple at 2146'. ~,,,S~ Oil ~ Gas ~nchorag~ 14. I he oin~ is true and corral to the be~t of mg knowledge. Sign~ ~ ~ ~ ~- TitleDistrict Petrole,]m Rng { n~r The sp(ce below ~ Commission u~ Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date __ Form 10-403 Submit "1 ntentions" in Triplicate STATE OF ALASKA ~/ ALASKA 0IL AND GAS CONSERVATION COMMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS / Name of operator Sohio Alaska Petroleum Company Work°vet operation [] Address Pouch 6-612, Anchorage, Alaska . Location of Well . at surface 7. Permit No. 82-i76 8. APl Number 99502 50- 029-20850 674' SNL, 1896' WEL, Sec. 31, Ti]N, R14E, UPM EleVation in feet (indicate KB, DF, etc.) ! 6. Lease Designation and Serial No. KBE = 79.75' AMSL I, ADL 28310 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. B-21 (12-31-11-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of July ,19 83 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results o'f pressur9 tests 14. Coring resume and brief description 15. Logs run and depth where run I 6. DST data, perforating data, shows of H2S, miscellaneous data See Attached NOTE- n form is ,eq~red for eaCh calendar month, regardless of the status of operations, and must be ,,,ec~ ~n duplicate wi'th the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 R,v 7-1 Submit in duplicate PEREORATING DATA Well B-21 (12-31-11-14) PBU June 10, 1983: Pressure tested tubing and inner annulus. July 3, 1983: Rigged up Dresser Atlas and perforated the following intervals using 3 3/8" Jumbo Jets at 4 spf: 9628' - 9670' BKB (Ref. BHCA/GR, 12/11/82) 9700' - 9760' BKB ( " ) Put well on production. July 9, 1983: Shut well in to prepare for static pressure survey. July 11, 1983: Ran static pressure/temperature survey at 8800' TVDSSo July 13, 1983: Set and tested SSSV in ball valve nipple at 2146'. Well on production. SOHIO ALASKA PETROLEUM COMPANY · o: SFO/UNIT/STATE: (-Marathon) SFO ARCO CHEVRON EXXON · GETTY MOBIL PHILLIPS STATE. BPAE (Transmittal Only) 3111 "C" STREET ANCHORAGE. ALASKA · TELEPHONE (907) 265.0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 7/26/'83 Date: Trans.#: - CC#: 74603 CENTRAL-FILES (CC#'s - Transmittal Only) REFERENCE: ' SO~I~FINAL DATA.- PRESSURE SURVEY DATA /~~T~he following material is being submitted herewith. Please acknowledge receipt by signing a ~.- copy of this letter and returning it to this office:-- 'BHPD & Pressure Analysis Pressure Survey I! HP Pressure Analysis Pressure Survey HP Pressure Analysis HP Pressure Analysis BHPD & Pressure BU' Survey .BHPD & Pressure Analysis BHPD & Pressure Survey BHPD & Pressure Survey Pressure Survey B~IPD Pressure Survey BHPD & HP Pressure Analysis Pressure Data 6/01/83 Camco 7/07/83 Otis 7/05/83 Otis 7/09/83 Otis 7/11/83 Camco 7/03/83 Camco 6/25/83 Camco 7/12/83 Otis 7/12/83 GO 7/07/83. Camco 7/08/83 oo 6/6-7/83 Dres 6/20/83 Camco 6/04/83 GO 5/18/83 Otis 5/11/83 Otis 5/24/83 Otis 5/22/83 Otis 5/15/83 Camco 7/07/83 GO [4/82) RECEIVED DATE 19 Victoria Aldridge Development Geology Well Records TP1-5 SOHIO ALASKA.PETROLEUM COMPANY May 9, 1983 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive · Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells B-18 through B-23 and B-25, C-18 through C-28, and D-16 through D-23 (excluding D-19) Gentlemen:. ' Encl'osed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our proposal to perforate these wells. GJP:JLH:pjw / G..' J..P%isga ~j _Dist-r~ Petroleum Engineer Enclosures CC: J. D. Hartz Geology Well File #17 ~-. STATE OF ALASKA ALASKA C AND GAS CONSERVATION CO/-'~IISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 82-176 3. Address 8. APl ~_b~0850 Pouch 6-612, Anchorage, Alaska 99502 50- 9. Unit or Lease Name Prudhoe Bay Unit OTHER [] 4. Location of Well At Surface: 674' SNL, 1896'-WEL, Sec. 31, TllN, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 79.75' AMSL 6. Lease Designation and Serial No. ADL 28310 10, Well Number B-21 (12-31-11-14) PBU 11. FieldandPool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] . Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated during June/July, 1983, using 3 1/8" carrier guns at 4 spf. A lubricator will be installed and tested to 3500 psi for all well work. 9628' - 9670' BKB (Ref. BHCA/GR, 12-11-82) 9700' - 9760' BKB ( " ) An SSSV will be set and tested in the ball valve nipple at 2146'. 14. I h lng is true and correct to the best of my knowledge. Signed ~C,~ (~-~-~ _.~/~_ TitleDiStrict Petroleum Engineer Thesa~ace below ,.o~r C~mmissi(~n uset.~.~. ~ Conditions of Approval, if any: ORIGiHAI. SIGNED BY LOHHIE C. SMITH Approved by Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1~0 Submit "I ntentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY Mr. Harry W. Kugler, C~ssioner Alaska Oil & Gas Conservation Ccmmzission 3001 Porcupine Drive Anchorage, Alaska 99501. COMM 3111 "c" STREET. ANCHORAGE. ALASKA TELEPHONE (907) 276.511-1. I ANCHORAGE, ALASKA 99.~02 J ,j ,~; ~ 13 J ! .J STAT TEC !CONFER: J · i FILF:- ' J Niakuk No. 3 Prlxfhoe Bay Unit A-24 Prudhoe Bay Unit TR. No. 1-11-12 Alaska Island No. 1 Prudhoe Bay Unit B-20 Reference is made to your letter dated Febr%~mry 4, 1983 regarding digitized LIS tapes for the above-n~ subject wells. These tapes have all now been sukmzitted to you under separate cover, with the exception of Well Niakuk No. 3. No digitized LIS tape is avm~ 1able for this well. cc: Well Files #17 Very truly yours, District Drilling Engineer I,,~ RECEIVED F E B 2, 1983 Alaska 0il & Gas Cons. Commissior~ : Anchorage SOHIO ALASKA PETROLEUM COMPANY 10: SFO ' ARCO EXXON PHILLIPS "':~ATE OF AK CENTRAL FILES (CC#' s-Transmittal 0nly 3111 "C"STREET ANCHORAGE, ALASKA TELEPHONE 1907) 265-0000 MAIL: POUCH'6-612 ANCHORAGE, ALA$..KA 99502 Date: 2-11-83 Trans. #: CC#: 56127 REFERENCe': .? ~9OHIO MAGNETIC LIS TAPES &. LISTINGS ~'he' following material is being submitted herewith..Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- f '" . State~l 1-4-83 , ~ ~.D-22-- 1'6-83 i 1-8-83 · <1~' /iF-18~ 12-20-82 'mil-18 1-3-83 ' \[ -'~C-3u/, 11-25-82 N~*D-22'/" 1-5-83 ~x..J"' ,.~t,z/ "C-28 12-30-82 -'~ ~.,~(-" '/7~ ~.B-~22. 8-22-82 --,. ~:J' [ __) '*A-24 7-21-82 ~fr_/ ',Z-lO 8-25-81 ~'2~?~' 12'11-82 C.H. TDT-M Open Hole C.H. ~xrL C.H. TErI~-M Open Hole C.H, CNL C.H. ,Open Hole ACC 66256 ACC 6630.4 ACC 66306 ACC 66247 ACC 66257 ACC 66336 · :-.ACC 66204 BHC-AC/CDL-CD/CN ECC 1539 BHC-AC/CDL-CD/~ ECC 1590 O.H. Replacement ECC 1423 O.H. Replacement ECC 1373 DIFL,BHC/AC,CDL- CD/CN ECC 1546 O.H. RePlacement ECC 1075 DIFL,BHC/AC,CDL- CD/CN 13CC 1566 (H:~Run-- #- Dres /~ Dres Dres *SFO & EXXON: received the Tape(s) Please confirm this. RECEIVED DATE An Asterisk:(*) next to a listing abouve means you should have and Listing(s) directly from the respective service company. Alaska 0ii & Gas C:ms. Commissio~ Aqshorago February 4, 1983 _ Mr. R. Reitey District?Drilling Engineer. Sohio Alaska-.Petroleum' Company Pouch 6-612 ' Anchorage, · Alaska 9950.2 Dear Mr. 'Reiley, The>AlaSka 0il an~'Gas Conservation Cor~mission has recently checked 'the records of wells completed since January 1, 1979. This review has revealed that the digitized data for certain logs run in a well is.no~ on file~:with :the Commission.' '.~ ~ . The Oil-and Gas Regulations require the operator to file, within 30 days after completion, suspension, or abandonment of a drilling well, the digitized data, if available, for copying, for all logs run in the well except velocity surveys, experimental logs and dip- meter-surveys. We would request that you check your records to see if the data has been Submitted to the COmmission and, if not, that you comply with the regulation with regard to the following wells: ~-' ~' ' ~; ' - Niakuk' 'No, 3 ' Alaska Island No. 1 Prudhoe BaY Unit Mo. A-24 - Prudhoe Bay Unit No. B-20 Prudhoe Bay ~Unit TR. No. 1-11-12 Prudhoe~.Bay Unit B-21 Thank you for your cooperation in this matter. Yours very truly, , Harry. W. Kugler.. ~:Commiss ioner BY ORDER OF.. THE~ COMMISSION ] X DE XI'iD SOHIO ALASKA PETROLEUM COMPAr','Y 31 i ; "C" r.~;REE! A;<C.~,ORAGE. ALASKA SFO ]ELEPHONE (907} 265-0000 ARCO MAIL: POUCH 6-612 CHEVRON ANCHORAGE, ALASKA 99502 EXXON - ,- 1/14/83 GETTY Date: SFO/UNIT/ STATE: MARA~ON Trans. #: 3020 MOBIL CC#: 56020 PHILLIPS E OF. ~~ PAE (Transmittal Only) REFEREN~..ENTRAL FILES (CC#' s-Transmittal Only) * Date to State Via Drilling: 1/14/83 OfHIO OPEN HOLE FIN___~_~ LOGS_ lowing material is being submitted herewith. Please acknowledge receipt by signing a this letter and returning it to this office:-- SFO/UNIT/STATE: B-21 DIL/SFL 12/6/82 & #1 2696-9342 Pres /~-" & 2" 12/11782 ¢2 9359-10188 Dres 12/11/82 #1 9358-10162 Dres 12/11/82 #1 9353-10122 Dres 5''-~& 2'~-' 12/11/82 #1 9353-10120 Dres 5".~ & 2" B-21 BHCS/GR B-21 CDL/CNLog B-21 CDL S TAT E ONLY: DIRECTIONAL SURVEYS: . Magnetic Single Shot Directional Survey Date:121I~27/82-06/82 Job#: 1182-027 Gyroscopic Directi~al Survey Date:12/24/82 Job#: 1335 ~~~ Victoria Aldridge RECEIVED /"ll¥ .[ ~ .~,~,~ - Develpment Geology ~[aS~a ~& .... . Well Records TP1-5 ~chorag~ '"'n~Ssioe SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 January 17, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: 'W~'.T-. 'B-21 ' (12-31-11-14) PBU Enclosed, in duplicate, is Form 10-407, Well Completion Report for the above-named well together with the Well History, Well Logs and Directional Surveys. This well has been completed as a non-perforated oil well. Very truly yours, R. H. Reiley District Drilling Engineer encs cc: Well File #17 Geology Nask~ O~t & Gas Cons. commission AnchoraoJe STATE OF ALASKA ALASKA G.,~AND GAS CONSERVATION CO~. ;ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG -1~ Status of Well -. . _ -. Classification of Service Well : OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] , 2. Name;of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-176 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029'20850 4. Location of well at surface 9. Unit or Lease Name 674' SNL, 1896-' WEL, Sec. 31, TllN, R14E, UPM !-"L~-.~'i-;C::"'-;~? Prudhoe Bay Unit 10. At Top Producing Interval Top of Sag. :R. Sst. ~ Number 'o ...-. ¢ ~ B-21 (12-31-11-14) PBU 1534' SNL, 4661' WEL, Sec. 31, TllN, R14E, UPM lo,r... ~ . I , · At Total Depth I i3. H. _ ~ ~ 1 1. Field and Pool 1456' SNL, 4894' WEL, Sec. 31, TllN, R14E, UPM-- ' Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) J 6. Lease Designation and Serial No. P~'~z~ Oil Pool ABE = 79.75' AMSLJ ADL 28310 , 12 ' E~ate"S~)~ dd~ ~- 13' Date T'D' ReaChed12--11--82 14. Date Comp., Susp. or Aband.12_16_82 J 15. Water Depth, if offshorefeet MS t I16' NO' Of c°mpletiOnsOne 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey i 20. Depth where SSSV set 21. Thickness of Permafrost 10200'MD-9403'TVD 10150'MD-9355'TVD YES [~ NO []I 2146 feetMD 2095l 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR/FEC/CNL/CAL, HDT, CBL, GyrOscopic Survey 23. CASING, LINER AND CEMENTING RECORD ~ SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED . 7-U x 30 Insulated Conductcr Surfac( 110 36 8 cu. yds. concrete 13 3/8 72# L-80 Surface 2690 17 1/2 3720 cu. ft. PermafzDst II 9 5/8 47~ I_.~80 SurfaCe 9359 12 1/4 1268 cu.ft. Class 130 cu.ft. Permafrost C -7 26# L-80 9105 10200 8 1/2 366 cu. ft. Class C- w/18% salt 24. Perfor. ations open tO Production (MD+TVD of Top and Bottom and 25. TUBING RECORD · interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5 1/2" 9042 ' 9042 ' W/4 1/2" taJ~Lpipe 9180' None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. - DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED . : . 27. PRODUCTION TEST Date First Pro_dgct?n : I Method of Operation {Flowing,gas lift, etc.) I · . Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO · ,. :: _- - . TEST PERIOD ~ t . . , , .. Flowq-pbing Casing Pressure CALCULATED.I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) PreSs. : 24~-HOUR RATE "IF i ; · 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. , - : .None.., . ~ -. = , ~ : .. jAN 1 ? i983 Alaska 0it & Gas Cons, r,.~...___., Anchorage Form 10-407 Submit in duplicate Rev. 7,1-80 CONTINUED ON REVERSE SIDE GEOLOGIc MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS: DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag. R. Sst. 9394' 8555' Shublik 9416' 8576' IviShak 9441, 8600, 31. LIST iOF ATTACHMENTS We] 1 History, We!l _Logs & Directional Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ [~-[2) %,';---- Title Date R, H. Re~ey ~ ' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of serVice Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate Which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". WELL B-21 (12-31-11'1'4) PBU WELL HISTORY Spudded well at 2130 hours November 26, 1982. Drilled 17 1/2" hole to 2704'. Ran 65 jts. 13 3/8" 72# L-80 Buttress casing to 2690'. Cemented with 3720 cu. ft. Permafrost II cement. Inst~]led and tested BOPE. Cleaned out to 2646', tested casing to 3000 psi, okay. Drilled out to 2720', ran leak-off test to 0.72 psi/ft. gradient. Directionally drilled 12 1/4" hole to 9370'. Ran 241 jts. 9 5/8" 47# L-80 Buttress casing to 9359'· Cemented in two stages: First stage with 1268 cu. ft. Class G cement; second stage .through D.V. packer at 2601' with 130 cu. ft. Penmafrost C cement preceded by Arctic Pack. Cleaned out D.V., tested casing to 3000 psi, okay. Cleaned out float equipment and directionally drilled 8 1/2" hole to 10200'. Ran open hole logs. Ran 28 jts. 7" 26# L-80 IJ4S liner to 10200'. ~ted with 366 cu. ft. Class G cement with 18% salt· Cleaned out to 10150', tested liner to 3000 psi, okay. Changed well over to NaCl. Ran CBL. Ran 209 jts. 5 1/2" 17# L-80 A/B Mod Buttress IPC tubing with 4 1/2" tailpipe assembly to 9180'. Landed tubing with ball valve at 2146' Displaced tubing to diesel, set packer at 9042'. Released rig at 2400 hours December 16, 1982. · Installed and tested tree. Tested tubing to 3500 psi, okay. Ran gyroscopic survey, secured and tested well December 24, 1982. RECEIVED JAN 1 ? 1983 Alaska Oil & Gas Cons, Commission Anchorage SOHIO ALASKA PETROLEUM CO. PAD. B (12...'31-II. 14) B'21 Controlled Drilling LES HENDERSON 349-3114 Consultants CONTROLLED DRILLING coNSULTAntS ' · ":i ."-:'- i'----- :' 7608'Hishlander 'DriVe-i':-'-- '"':' ' . ' -.--~" ^nCh0rage, ^laSka.99502 - - --'~" , '-. ~- . (907) 349-3114~' !':.'-.' --'- . _ ~ . Mr. Brian Rose ' Sohio Alaska. Petroleum Company Pouch 6-612 ' ^nchorage,'^K 99502 .- December 8, 1982 . .. . '.. RE~ Magnetic. Single Shot. Survey . Job No'. 11'82-027 Well B-21 (12-31-11-14) Prudhoe Bay Field North Slope, Alaska Date of Suryey: 11-27-82 to 12-06-82 Dear Mr. Rose: -:,- ~%~'~"~L'~-" .' -~ -. Please find-enclosed the Or~"~d~x (6) copies of our SurVey'~7~a~e Well. The method used Magnetic Single Sh°tm~rve~~R~us~- ~7 of Curvature. The depth in calculating this . of the surv.ey was -~ ~ . _. '- Thank you for giving us this opportunity to be of service. Yours very· truly, Controlled Drilling Consultants, Inc. : ' , ~ .~ . , ~, ~ -, -. Cecil Harrington Directional Supervisor. ) : . . · . : , . : . . · ., , ,. . ~ .4 :. : . , C'ONPL..ET ION REPORT SOHIO ALASi<A PETROLEUH .......... !'~__8~t_4_E__T._!~___S ~_.N G_'._L._E_.._._S_H.L).'T _8 P. R.V E Y . ....... ~A_E~.I__U"_S.'__OF...__C_U_R..V. ATURE METHOD OF C:OMPUTAT I ON ............................................................ SS C .... n ..... , COMPUTED FOR ,..u.. BY ~L:ERNTECI4<FH LiNDSEY ~..: A$SOC > ":' DEC 82 WELL B '" ' 2- - - KE', ELEV. '?9.75 FT, TRUE ....... !N..E~..., ...... D.._Ri. ET_...V.E_R_T.! CAL. SUB _._~.E__P._.T__H....~ N L,_L_E ......... _D_E P_ _T. H ............... ~.. E A D M "i " RECORD OF 5tRVE¥ DR IFT D I REC DEG. 'TOTAL. uuoRD INRTE;~. DOG LEG c L o S u R .... s' VER. TV ...... DISTANCE ANGLE DEG,,-' 100FT DISTR, b M S 0 0 0 ,00 -79,75 '~ OOW .00' S .00 W .oo s 90. o o ....... w ;oo'o ,'O0' ....... .e.,~_~UME[.L%E~_T.I_.C_._OL ..... r_!.! ....... 2_.7, 00 .F T, 27'0'0 0 0 2_EO0 O0 2620, '~"" 2829 2 .30 ~-'" ..... ......................................................... _~.~:~....9_6 2749,21 ~; ~ 6.0 O W ........... 2.~:~ 6 ............ O_ ......... 8_~.~J 69 2.84J ,94 S62, OOW ~.0i2 7 45 30ii 04 29~i,z~ S62 OOW .......... _~_J.._O_~ _9_ ....... _O ......... 3_j..~_i..,O7 3021 , 32 S64, OOW ................. ~.~_~.2._t_~ ............. ~_ ............ _~_~7.~ ,.~ ~, 5~ S~. ........................................................................................3473 1~ 45 ~461 86 3~82,11 ~6~ ,OOW ~565 18 15 3549 60 3469,~'Pi S65,00W ~ .......... ~_2.~_%~ ~o~ .................................... 2 O 45 ~6~.~ .._2 O ~558,45 A~ ~o ...., 0 OW ............... _~_~._i___~_~ ........ _0 .......... ~72~.__57 ~64~, 82 S65,0 .... ~8_~_~z 2~ ....... ¢___3.8_0_~_...02_ ~727,27 S66, OOW ,...~?_~_~._..86_.___.1_..5 ...... ~_89 0 ~ 1 ~8~ O, 56 · ,~6 OOW ......... ~J...~_.~____.~_~_ ...... 0 .... ~_O~.~.._~.l ~9~, ~6 S~,7, OOW ............ ;~_S_.~_~_.~_.O_~_~ .......... ~_~ 8.6 ~7 ~ 1 07,1S S68,0 OW .............. ~.~_5_~__~S___~_O ........ ~_65_.....66 .~6~5.91 ST~. 0 OW ......... :.6.0~_.~__.~.6 ............ q .......... _SG~.O .~ 555~. 06 ST~, OOW ,00 S 2,23 S 5,25 S 10,3i S 16,33 S 22,58 S 29,75 S 38,30 S 48,03 S 59,50 S 72,76 S 87.25 S ! 02,29 S 118, 18 S 152,~8 $ 181,55 S 246 7'0 3 03,44 S 360.48 S 426;.94 S 1176 463,22 S t317' ,(tO W '? 64 W i7 ~5 W 28 96 W 59 89 W 80 05 W i 02 96 W I28 14 W 156 57 W 187 64 W 220 6~ W 256 34 W :335 O0 bi 405 40 W 744 72 W 937 29 W 93 W ,O0 S 90 0 O W ,O00 .00 2,66 S 32 59 59 W i :940 2, O0 9,27 S 55 :<O t W 3,764 8,77 2O,Oi S 58 59 37 W 1 ,944 i9,29 - -, oo W i 37 48,58 S 62 18 0 W i . ......... 66,87 S G3 ~5 15 W 2. em,75 s 25 4s u a, I1~,.62 S. 64 59 .~2.W .i,.932 141,28 S 65 5 ~O W 172 ,G~ S ' = ~ ~c, 4 ~O td 206 9~ S 65 3 45 W 32,29 47,50 ' 65, ;"-;9 _. 87.41 243 282 368 444 625 804 1004 1251 1396 3 0 9O ,218 999 71 75~ I .--.4,. 40 ........ . 248 ! :3'B~ . 25 21 S 65 7 40 W 1,i14 240 27 S 65 i4 54 U 2,446 .278 03 S 65 32 24 W 1,492 363 20 ''S65 52 34 W i-,'-i56 439 ~2Z S 66 47 0 W ,46i 17 S 67 49 52 W ,270 798 ~n S 68 ~ .j7 47 98 S 70 ~ 40 W 27 S 70 37 29 SOHIO WELL 8-21 ,) F.." S' S ',[ N ~,,, L E H 0 T :!3 [ t IR., V E Y 8 DEC, .......................................................... T_.RUE ...... ~I..E.~.~ .......... D.t~. I...F.'_T.....~' E.B T ICAL SUB DR I FT ....... [!EP.T_H._¢I_.N. G!,.E DEPTH SEA [:, I REC ................................................. D_ ......... .M DEC;, 6405 35 15 5'956.,76 5877,01 $76,00W 6866 3~ 45 6:$36,67 e,~5~,,.~, r rS O O W ....... 7.2..?.~,r.,__..~..'._i ............ _.0 ............ 6.6.88 6608,63 S76, eot,} 8182 ~2 "0 7490,71 ........... :8~.6..Q_..~ ...... ¢_ ....... E8.~.3. ,.5 ~ Z 76 ~, 8.4 Sa I , O OW ..... 8.~:~.? 19_ ......... 0 ...... 8O!.9__,e6 ~40,11 .~6, OOW 8999 19 ~ 8258,1 .=,, :,, 0 OW ........... .9..2J.8__t.9 ......... ~ ....... :8.¢.~6.5., 20 8:385,45 N8 6,0 OW RECORD OF SURVEY TOTAL COORDINATE,. 519, 582, 635, 696, 743 769 776 780 '7'78 775 72 S 154:$,82 W 8,9 S 1797,17 W 61 S 2008,6t b.I 48 S 2228,1i W 57 S 24 03,87 W 42 S 2536,81 48 S 2598,81 06 S 2680,77 W .i9 S 27'52,02 94 S 2777,80 W 35 W CLOSURES D I STANCE ANC;L.E D H LEG I TY OFT 1889,34 S 72 ~ 48 W 2106,7S S 72 26 25 W 23~4.43 S 72 ~8 29 W 2516,25 S 72 48 42 W 2650,93 S 73 7 ~8 W 2712,~3 $ 73 2~ 53 W 2791,95 S 73 46 J3 W 2859,93 S 74 12 38 W 28.84,14 S 74 23 35 W S E C T i 0 N D t S T R N C: E . t 8 l"' 1 626 676 2'i 05,55 861 233',]:. 34 146 2515 , 29 543 2(,5 0,28. ,605 27i t ,89 . :388 2791 , 79 743 2S5'"~. 9 I ..... 419 2884 , 14 ............ SOHIO WELL 8-21 AIN, GLE ~HL ~ .E ......... ME~_~UP,_ED__[~.E8_T.H_...._.t~.ND...._OTHER DATA FOR EVERY E'vEN TRUE iZ;'_L.i .................... .... O.-TVD ......................... Q~iL TH__ D. E P T iq SEA [DIFFERENCE ................................................... .0. ................ 0 , -8 0 0 ........................................ i8__0_ .................. 1.8 O, 1 00 0 ............................................... 28..)_ .............................. 28 O, 2 0 0 0 .218_0 ................ :380 , 3 00 0 ....................................... 4_8_0_ ................ 48 O, 4 O 0 0 .............................. 58_0. .................... 58'.0, 5 00 0 ................................. 6_8_~ .............................. 68.0.., 6 O 0 0 ...................................... ?_8_0 ................................ 78_0, ?OO 0 ................................................ 8.8..:~ ................................................ 88.~), 8 0 O 0 ................................ ~8..8 ............................. 98 '~;!_ ....9 0 ..................................... l_0_8..0_ .............................. i_ .08.0, I 0 O 0 0 ........................... i18£!11 8.~, '1 ~'"i ~.~ ......................... .t.~_O ..................... i.28 O i 2 0 O 0 ................................. l~Sf~ .................... ................... 1._38 O., J ~ 00 0 .............................. i._.~.8._Q .................. i 480, i 400 0 ......................... __l 58._~ ................................ 1 ="' n . .............................. .168__0. ........................... 1.68 0, 16 0 O 0 ................................ .IZS. O ................... i 78 O, i '? 00 0 ................................. 19'_80 ............................ J 9.80., 19 00 0 ! ................................ 2_.~8.0 .......................... 2 08 O. 2. 000 0 ............................ 2.1_8_0. ............... 2.i 8..0 , 2 i 00 L .................. 22.8_¢8. ..................... Z.;,'U .~, 2200 0 ' ~SJL .................. 238 O, 23 0 O 0 ............. 2_.4._80 ..... 248 O, '24 00 0 .......................... ~58__0 ........... 258 O, 25 00 0 ........................ 2.68_0_ .............. 268 O, 26 00 0 ........................... 2:Z8..0 ........ 2.7'8 O, 2700 0 ................................. ~_8_8_0 .................. ~ 88 O, 28 0 O O ................... 29_8_0 ..... >'98 O. 29.00 0 ............................ ;3_0_8.1 :308 O, 30 00 1 .............. 3..1. 8_~: ~ 18 e, .... ........... _~..~._~.~ ...... -, ~ 0, :3 2 0 0 4. ...................... -,~u.~ ..................... ~ :38.0 33 0 O 7 '~ ...................................... ~_.4.92 ......... ~.4_8.0., '.340 0 i t FEET OF VERT i [:AL, CORRECT I Oi',t 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 c, UB ...~EH DEPTH, TOTAL. .3 8 14 21 29 S8 50 COORDINATES ,00 S ,OO W .. , O0 S , O0 ,00 S ,OO.W ................... , 0_0. $ ..... O 0 W .oo s ,oo, ) · O0 S .... 00.. W ...... ,00 S ,00 W ... .o0 S ,00 W ,00 S ,00 W , O0 s , oo. w ............. , o oS ...... ,_.0.o W ,00 S ,00 W ,oo s ..... oo..w · OO S ....... O0 W ,00 S ,00 W ,O0 S ,00 W .. · O0 S .... O0 W ,OO S .......... ,~0.0W ..... ,00 S ,00 W O0 '~ O0 W ,00 S ,00 W ,00 S ,00 W ,00 S ,00 W ,00 S ,oO t~1 , O0 S , O0 W ,00 S ,00 to ,O0 S OO t,,I . ,99 S 37 td _.. ,53 S 4 23 w ,39 S 13 55 W ,76 $ 41 02 W ,38 ~. ''~' ,.~9 06 W ,85 S 81 41 t,.I .25 S 107 93 td SOI,~IO WELL B-21 S~NGL, E :SHOT SURVEY ') c:, HERSURED DEPTH RND OTHE'~ R EVE ,:l, JB SER [EFTH ........................................................ ._. ......................... ~,. DRTA FO EVERY N lO0 FEET OF- "; " ~'' , TRUE ......................... _H. ER_..~.!JP_,E__D_ ........................... V..5_,RTI.CAL "SUB HD-TVD .................. _.O_.EPT..H .......... DEPTH SEA DIFFERENCE VERTICAL CORRECTION TOTAL COORDINATES 3580, 3500 ~.?_.0.4 ......... 36S O, 36 o o .............................. ~_s_' !._2. ......................... 3.;~s o ,.., 0 .... 392~ .......................... _'.$880 ....3800 4034 39e0, .3900 4148 40S0, 4000 .............. .4.2_6.4 ....................... 4..1.`9 o, 4i O0 .............................. ~_~._.0.. .......... 428 o. 42 o o 449`9 43,90, 4300 ............................... 4&6j_6 .............................. ~..4`9 .o, 44 o o ........... 4_._7_3_¢_. ..................... 4580, 4500 ......... 485.2 ............ 4,580. 4600 .............................. _4~ ?_..!_ ..................... 4.780, 4700 ............................. ~9_8~ ................................. _488 O ....... 4_800 ...............................................................52 (~9 ,4' ~"~. ~ ~" ~'~ · 4~B {~l 0 ..........5~'_2¢_ ........................................ 50,9.0, . 5 O0 0 .................................. ~.4.4.._8_ ...................... 518 o, 5 ~ 00 ........................... 5_57..0. ....... 5280 .: 2 00 .............. 5.6.9.~. ........538 o, 5 ~ 00 .......................... ~8.J.~ ...................... .5.. ~ 80, -- 5400 594~ 5580, 5500 ............... _6.0.6._4 ............ 568 .O, 56 00 6188 5780 ................................................................... , o, O0 ........................ 6~_.!_ ! ....................... 58`9 o. 580 o ............. 6_4_~._~ .... 59`90, 59 0 o .............. 6_5_5.5. .......... 6 o'g o 6 o o o ...................... 66Z?_ ......... 6180 61 oo ................. _6_E~_~ .......... 628 0 62 00 ............................. 6_9.!._8 ................ 63'8 0 6300 .............. 7 0_~_? ........................ 6~_8.0 64 0 0 .................... g..1.~ ........... 65_8 o 65 o o .............. ~.2_Z?Z .................660 o 66 o o ................. ~ ~8.8_ ............... 678 o, 6700 ............................ _;L5 0_. 3. .' ....................... .6_ee o, 6s o o ...................................................7{~,, '~ 7 I,~ ~. 8.~J ~, "' ~-e{ .... 17 23 42 54 100 117 135 t54 1 72 209 228 248 268 290 312 40'7 43O 453 475 496 517 557 575 592 608 62_S 6 9 I0 12 t4 15 17 t7 I8 t9 18 1`9 19 19 20 20 22 22 25 24 23 23 23 22 21 21 20 20 17 15 14 79,6i 97,36 136,52 157,93 I79,96 202, 224, t 4 245 266,98 287,05 ,306,07 324,58 :~42,93 :36 i, 09 379 397,88 4i6,73 4._-45.77 454,14 471 ,80 489,23 506,51 5213,65 54 O, 5~.~ 557.23 57.3,65 589.81 605,52 620,75 635,51 650,14 664,90 6,79,78 i ._-47 ~'? ":' 0 96 (, 251 6t 29.9 06 348 i 3 401 49 45,' 2.~ 514 36 572 89 ~32 44 692 59 753 ,7 l 814 67 876 69 939 40 i 003 63 1070.t8 1139,09 1210.13 1281.13 i 351,62 4,~1 52 1490 `94 1559 56 i627 40 i 694 ~'~'~ i760 i2 ' '~ ,92 18~4 1887,94 i949 U~ 2008.24 2065, ~5 2120, 06 2~72 SOHIO WELL ~ INGLE ..~HUT SLtP. VEY ...... _t~.tE.RS.U.RED_...DE.P...T_H...._..~.N D. 0 T H E R D A T ~ F 0 R E V E R ~ E V E N 1 00 F E E T 0 F o L B S E A D E F ! H TRUE .......................... ~I~-.8_~.U..~._E_.~ ................................ !~_I;.R. ]' ! C ~ L S U B M D - T V D ..................... D.E.P__TH ........ DEPTH SEA 'DIFFERENCE VERTICAL CORRECTION TOTAL uOuRDINAT ............................. ZE4_a. ................ 71 s o ....................................... 79....~;a ......................................... ~.28 0 ................................... ~j_Zo ........................ 7 4 e o ........................... 8_a7_8._ ........................... .7.. 58 0 ............................. _8_~¢_5..'. ............................... Z.~ 8 O, ................................... 8_4_~_'a .............................. 778 e, ............................................... 8_~_~_8 .......................................... ~_8.8 ................. __8.~E5_ .............................. ................................. _8__8..'!.._0 ................. 8. 08 O, ...... .8_~__6 ......... 8 i 80 .............................. 9__0~.~ ......................... 8.28 O, .......................... ~.j..~_ ........................................ 8.380. ........................... ~2.3_.3._. ......................... 848 O, ............................ _'9~7, 85_..4. O, , 7000 650 , ?joo . 7200 672 . ~3.00 682 . 7400 690 , 7500 698 7600 705 7700 712 ..... ~.800 790.0 724 8000 730 8100 736 8200 742 8300 747 8400 753 .... 8460 757 O 8 8 7 7 6 6 6 6 694,74 S 2222 4,5 W 709,01 S 2270 25 W 72i ,69 S 23i5 70 --_';.,. 3~, e~,..:~ .... ~__' .............. S 2Z..~Z~,,:,@ ............. 7~,7 ..................... W 742,59 S 2399 54 td 75t,26 S 2438 55 W 758,94 $ 2476 59 t,,l 765,64 S 2513 66 W 77i ..-¢..5$ 2549 76 W 775.39 S 2584 9.5 W 777,78 S 26i9.39 W . 779.35 S 2653 . 780.15 S 2688.21 W 779,72 S 2722,64 W .. 777.82 S 2757.03 W 775,94 S 2777.80 ltl ..... ~..N.TER..P._Q.L.~C~._T.E.C.~_. V~L. UES FOR EVEN TRUE .............. · ..tF~(Jt.~_!J.R__E.D__ .... VER T I CAL ............................. D_~_F_'_T_.H .......... DEP 'TH ........................................ t.O__O__O. ............ t. 0 O O, ....................................... _2_._O_.(.t_O_ ............................ ~O_O0. .......................... :~_~0__0__0, ............... 2999, ......................................... ..4.0_.0_0. ........ ~ 94 9. ........................................ ~_.QO..~t .............. ~8. _.0.4, ................................... 6_0_.0._.~ ................ .............. _?_O_ O_P ............... 6 44 9. ........................................................ 8.0_o...(~. ................ ? S Z .................................... ~_Q 0 O ................. 8259. ................................................ 9._.29:? 8~40. } 1000 FEET SEA -80, 920, 1920. 2919, 3870. 4725, 5548, 6.369, 7243, 8179, 8460, OF MEasURE[. DEPTH TOTAL COORDINATES ,O0 S . ,00 S , ,.00 S . 9,56 S 15, 130,18 $ 28.7 3 i 0,65 S 768 462.65 S 1~J4 ~00,69 S J868 726,70 S 23'~4 780,06 S 2681 775.94 S 2777 00 W O0 W 75 U 91 W 55 W 68 W 09 W 8 DEC, IIII II MWD DIRECTIONAL-SURVEY CALCULATIONS TELECO OILFIELD SERVICES OF ALASKA 220 CENTER COURT ANCHORAGE. AL 99502 (907) 279-8631 TELEEO Teleco Oilfield Services Inc. 220 A Center Court Anchorage, Alaska 99502 January 13, 1983 SOHIO PAD B, WELL #21 Attached please find a copy of the computer calculated survey for the above mentioned well. On behalf of Teleco, I would like to thank you for the opportunity to serve you. We at Teleco realize the importance of good service and hope that you will continue to use our M?D services in the future. Please feel free to contact me if you have-any questions. Sincerely, Steve Billeaud Field Service Supervisor AnChorage Enclosures SB-ck DIRECTIONAL SU R',.," E Y I REPORT PAGE I CUSTOMER : SOHIO LOCATION : PRUDHOE BAY, ALASKA WELL PAD : B WELL NO. : 21 DRILLING CO. : AK UNITED . CusTOHER JOB NO. : -- TELECO JOB NO. : 282-AK MAGNETIC DECLINATION 51.58 E RI(] NO. : 2 TELECO OILFIELD SERVICES OF ALASKA, INC. 6116 NIELSON WY., ANCHORAGE, .~LASKA, 99502 TEL s (907) 279-865i! , DATA REDUCED BY RADIUS' OF C~JRVA/URE-METHOD TYPE OF SURVEY : MAGNETIC START DATE : 12/~/82 :FINISH DATE : 12/1:$/82 PLANE OF PROPOSED DIRECTION IS : S 72 W REPORT PREPARED BY ROB KIRBY . . MEASURED DRIFT TRUE VERTICAL DEPTH ANGLE VERTICAL SECTION DEG MIN ~ _ DEPTH 727:$ 51.08 6680.57 2108.50 7525 :$1.80 689~.86 22:$7.18 77A5 2~.5A 7087.57 25A:$.G7 8182 22.06 7A86. RA 2525.51 85G0 19.54 785~.7& 2655.92 8747 18.54 8016.12 2?20.75 8559 19.~6 825~.:$9 2799.85 9218 19.00 8ABI. AO 2867.55 9297 19.12 8556.05 2891.15 DRIFT TOTAL 'COORDINATES . D I RECT I ON DEG MIN 72.~6 S 7~.54 W ~=~..~ 54 S 241~.~8 W S 81.2A W 779.~A S 25~5.72 W S 86.80 W 785.85 S 2685.~6 W S 88. A8 W 78~.58 S 2687. A2 W N 86.18 W 788.02 N 2758.88 W N S5.48 W 785.73 N 278A. S~ W '-C L.O'.~ U R E S D I STANCE ANGLE DD MM SS . . 22:$7. :$8 S 72 29 1~ W 2~:$.79 S'72"28 ~.8 W 2525.71 S 72 58 2':3 W 26~0.5A S 72 58 28 W 2721.A8 S 75 12 56 W 2801.81 S 7:$ 57 57 W 286~.22 N 7A 05 52 W 2~5.58 N 7~ 1~ 29 N DOG - LE~ SEVERITY DEG/100 FT. 0.8~5 1.870 1.166 0.721 0,976 8.570 0.752 BOTTOM HOLE CLOSURE: 2895.:$8 FEET AT N 7A I4 29 PREPARED BY ABACUS COMPUTER SERVICE 820 W. ?1ST. AVE, ENTIRE CONTENTS COPYRIGHT 1982 ABACUS COMPUTER SERVICE W ANCHORAGE, PI. ASKA (907) 5~A-0761 ._ IIII I II MWD DIRECTIONAL-SURVEY CALCULATIONS TELECO OILFIELD SERVICES OF ALASKA 220 CENTER COURT ANCHORAGE, AL 99502 (907) 27g-8631 T L EO Teleco Oilfield Services Inc. 220 A Center Court Anchorage, Alaska 99502 January 13, 1983 SOHIO PAD B, WELL #2! Attached please find a copy of the computer calculated survey for the above mentioned well. On behalf of Teleco, I would like to thank you for the opportunity to serve you. We at Teleco realize the importance of good service and hope that you will continue to use our .M~ services in the future. Please feel free to contact me if you have-any questions. Enclosures SB-ck Sincerely, Steve Billeaud Field Service AlaSka Oil & Anchorage · DIRECTIONAL DRILLING SU R~'EY PAGE CUSTOMER : SOHIO LOCATIDN : PRUDHOE BAY. ALASKA WELL PAD : B WELL NO. : 21 DRILLING CO. : AK UNITED CUSTOMER JOB NO. : TELECO JOB NO. : 202-AK MAGNETIC DECLINATION : 51,50 E PLANE OF PROPOSED DIRECTION IS : S 72 W MEASURED DRIFT 'TRUE ;-: ) *';f::~R*~cAL DRIFT': DEPTH ANGLE VERTICAL- ' SECTION ' DIRECTION _ . DEG MIN DEPTH i:~ DEG MIN . 7273 51.0~ 668~. 57 21~8.5~ S 76. CB W 7525 51. ~ 689~. 86 2257. 18 S:: 71.54 W 77~5 26.5~ 7~87.57 25~5. G7: ...... S 72. 5G W ~182 22.0G 7~8G. 8~ 2525.51 S 7~.5~ W 856~ IS. 5~ 78~. T~ '~5~. 92 S 81.24 W 87~7 18.54 8016.12 2720.75 S 86.00 W 8999 19.~6 8254.59 2799.85 S 88.&8 W ~218 19.00 8~61.~0 2867.55 N 86.18 W 9297 19.12 8556.~5 2891.15 N S5.~8 N BOTTOM HOLE CLOSURE: 2895.58 FEET AT N 7& 14 29 PREPARED BY ABACUS COMPUTER SERVICE 820 W. 719T. AVE, ENTIRE CONTENTS COPYRIGHT 1982 ABACUS COMPUTER SERVICE TELECO OILFIELD SERVICES OF ALASKA, INC. 6116 NIELSON WY.. ANCHORAGE, -Pi-ASKA, 99502 TEL : (987) 279-8651 DATA'REDUCED BY RADIUS OF CURVATURE METHOD TYPE OF SURVEY : MAGNETIC START DATE : 12/05/82 -,FINISH DATE : 12/15/82 TOTAL 675.19 S 705.65 S ~¢~ 54 S 779.04 S 785.85 S 799.58 S 788.02 N 795.73 N REPORT PREPARED BY : ROS-KIRB~ ~.- . . . .-: ..... 7-.~ .... : ....... .................= ~2'~==== ................... =-~ .......... COORDINATES 2155.62 W 2255.04 W 2410.68 W 2543.72 W 2685.46 W 2687.~2 W 2758.98 W 2784.94 W C:L O"S U R E S DOG - LEG DISTANCE ANGLE SEVERITY DD MM SS DEB/180 FT. 2257. J8 S 72 29 19 W 0.845 25~5.79 S 72 28 ~8 W 1.870 2525.71 S 72 58 29 W 1.166 2660.54 S 72 58 28 W 0.721 2721.48 S 75 12 56 W 0.976 2801.01 S 75 57 57 W 0.570 2869.22 N 74 05 52 W 0.752 2~5.58 N 7~ 14 29 W 1.0~6 W ANCHORAGE, ALASKA (907) SOHIO ~i~LASKA PETROLEUM CONPAi',tY GYROSCOPIC DIRECTIONAL SURVEY RADIUS OF CURVATURE i'IETt4~][>_ OF L. HLCL'' ILR .... f ~ ON · DURVE RAN BY CH~PF'ELL,."b. IAI" ' COHPUTED FOR SD I 8Y OCEANTECH(FM L INDSEY JOB .~i 335 WELL B-2i,SEC,.S1,TIIN,RI4E t<B EL,.EV, 79.75 FT. SURVEY DATE 24 'DEC. 82 ASSOC. ) PROPOSED DIRECTION S72-i9~ TRUE M,.r-"'S./ DRIFT VERTICAL SUB DRIFT D~, TH AHt]L.E DEPTI4 .SEA DIREC D' M DE6, 0 0 O 10'0 0 19 100 20.0 O 20 200 · 300 0 20 300 ,-100 0 14 399 500 0 t9 499 600 0 19 599 ? 00 8 7 699 '8 8.0 0 32 799 900 0 28 899 lOOO '0 i.6 999 ilO0 O ,32 1099 1 ...... 00 0 7 i {, .~0 0 3,3 1299 14.80 0 22 1399 15 O0 0 25 i 499 1600 .O 31 1599 17',00 0 II i699 180'0 0 2? 179:9 1900 O 12 i899 2000 0 28 1999 21 O0 0 26 2099 2200 0 3t 21 99 2.S00 0 43 2299 2400. 0 37 23;99 O0 O0 00 OO 99 99 99 99 99 98 98 98 98 97 97 97 97 96 96 96 '96 95 95 94 · -~79.75 20,25 120,25 2.2 O, 25 320,24 . ,'% 4,-'. 0 , 24 520,24 620,24 "~'~ 0 24 820,24. 920,23 I 02 O, 23 i 120,23 i 22O ,23 1 ~20o 22 t420,22 i 520,22 I ~;2 0,22 I 720,21 ~820,21 i 920,2i 2020,21 2120,20 2220,20 232 O. 19 REt;OR[, OF'SURVEY · OCt S .00 td'~.,~ :00 22 f,t ,t6 E ~;~-- 28 1 .03 S ,E. 9 S ,88 S. I,.36 S 1,82 S 2,51 S ~,02 S 3,51 .S 3,98 S 4,45 S 5.19 S 5,92 S .6,82 S 7,77 S i i2 E I 49 E 1 7'2 E i ~2 E I 87 E 2 25 E 2 ,,r E 2 60 E 2 54 E 2 41 E 2 27 E 2 44 E 2 70 E 3,25 E 3;,87 E , i 1, 1, 1, 1, 2, 2, 3, 3, 4. 5, 5, 8, ANGLE D M S S 90 0 0 kl t,i35 ...=1 59 E N 8 i2 2':)b.t N 57 43 40 W .32 N 30 18' 36 ,E .44 N 23 42 ~"'- ,03 N 69 45 24 E .29 t,I14 2 2~ E i6 S 64 :t 42 kl 70 S 73 36 5i E 22 S 66 .4i 6 E 8i S 55 i8 41 E 86 S 68 i~ 27 E 59 S 56 28 25 E 3 i S 54 ~ 23 E "89 S. 51 6 54 E R9 "' 4=; ,. ~ ,. 37 48 E 99 S 40 77 57 E ... 4~, 50 6 E 65._ ~.,"" ",..,1 11 °2 E ~,',,,,, O0 S 27 051 E 7'3; S '25 8 28 E 51 S 24 31 46 E 55 S 25 30 31 E 67' S 26 28 0 E DOG LEG :BE'./ER ! TY DEli,.? 1 0 OFT ,000 .317 ,017 ,589 ,.100 . El8~ ,~,., .574 .200 417 ,067 .200 ,417 .434 .i83 ,108 ,267 .250 ,267 · 033 ,084 .200 ,100 SECTION D I ::: T A t.4 C: E -1 -1 -I -1 -1 -1 -1 -1 -1 -I -1 -i -1 -1 00 '" 1 - 07 16 - 23 07 -14. -60 96 4'.:) 06 47. 8~ 75 07' 12 SOHIO WEL. L E:-'21 SEC 31, T11N, R14F :sL R~F1L.:E LUL. ATiOi',t 674 'SNL, dOB ~ 13,35 1896 '~.dEL KB ELEV, I 1 dAN. 83 79.75 FI'. TRUE MEAS, DR'IFT VERTICAL DEPTH ANGLE DEPTI4 D H , ~.O,o 0 56 260.0 :.0 1'6 270'0 0 44 2800 2 7' 29 O0 5 23 ~000 7 19 ~1.00 8 53 3200 1 0 34 ~'00 ~2 28 3400 ~5 10 ~500 17 3600 19 16 37:0.0 21 49 3800 23 9 ~90.0 25 25 4..n 00 "~ ' Z,' 5 0 5 '0 42O0 29 49 4~00 31 2 44:0.0 3i 43 45.00 31 52 4600 31 57 47'00 31 47 4800 3i 45 4900 32 8 5000 32 41 51'00 32 2I 52:00, 32 31 5300 33 9 2499 93 2599 93 2699 92 2799 89 2899 66 2999 04 3,098 0.4 3t96 60 3294 58 3391 68 3487,75 3582 77 3676 40 ~768 80 3959 94. 3949 33 4.037 35 4124 54 42~0 7~ 4296 14 4381 14 4466 03 455 0 95 463.5 ~ 4720 83 4805,2~ 4889,58 497~,98 5058,01 :SEA 24.20 18 ,".-,~, 0 18 2620 17 2?'20 14 2919 3018,29' 3116,85 ¢214, ~3 33 i I, 93' 3408, O 0 3503, 02 3596,65 ~689,05 3957.60 4 044.79 4131, Ol 4386 28 447~ ~ 4556 '22 4641 08 4725 51 4,c09 bo 4894 23 D R I F T DIREC DE(;, ,., TOTAL C:OORDiNATE'" C L 0 S U R DISTANCE A D Si9 S30 S63 43E 57E 82E 73W 27b) 52W ,q 83 '" 4 66 E 9.83 S 4.98' E 10,6i S 5,35 E 12,74 S 4.,72 E 15,7i S 1,lO 21,00 S ' 10,81 W S65 9 11 ii 13 15 5i 43 S 3'I 6,1 0 2J3,46 S 4:06,4t 234.48 S 454,05 255.4~ S' 502,~9 276', 02 S 55~,06 296, 10 S 599.89 3~5,59 S 648,88 98 S 27 O1 S 26 89 S 26 58 S 20 74 'S 4 62 S 27 09 S 40 408 459 511 563 6i'6 668 721 S64,38W S64,93W S65,90W S66,48W S66,70W S67,38W S67.92W S68,63W S69, ~Tttl S69,40td S69,48W S69,88W S7 O, O5W 86 S 48 04 46 99 08 12 4.2 19 359 60 51 06 02 S 62 59 S 63 33 S 63 99 S 63 48 S 64 774,20 S 64 827',61 S 64 881, J9 S 65 934,65 S 65 988,70 S 65 334,55 'S 698,19 W 353 42 '"' ,35 , ~ 748 W '"'72 2q "' 7q8 "'=' ,. .... ~, - ,~,-, W 390,92 S 848,98 W 409.49 S 899,92 W $ 5~ S 56 S 58 S 59 S 59 S 60 S 60 S 61 S 61 S 61 S: 62 EN G L E. H S DOG LEG S E'./ER I TY DEG,.." 1 0 OFT ,317 ,667 ,467 1.,389 3,267 i, 9 S 4 J ,568 1 .688 1 ,900 2,701 1 ,895 2.219 2,550 i ,335 2,267 2,423 1 , 009 .993 1 ,243 ,702 ,162 ,209 .22~ ,201 ,436 ,550 ,d,~ ,-'t , ~4 .2'03 ,635 SECT I ON D l STANCE -2 -2 -2 -1 5 15 29 46 65 89 147 181 218 o58 4%. 302 ~'49 3'97 447 498 550 602 655 707 760 8~3, 866 928 974 28 34 50 36 03 47' 45 71 14 33 62,' 76 59 14 26 53 59 89 20. 02 32 79 16. SOHIO WELL B-'21 SEC 31, Tiihl, R14E . GYRU~uUFltS oURVEY SURFAC:E LLL. RT'iON 674' SNL JOB :~ ~ .%35 896 ' kIEL FSB ELEV, 11 JAN, 83 79,75 FT, REuLRD OF ~JR./'E~ blEAS, DRIFT DEPTH ANGLE D M 55.0.0 34 .5600 35 57'00 36 58.00 36 59 O0 36 6000 35 6i00 35 620.0 S5 '63'00 35 6400 34 6.50,0 34 6600 ~4 67'00 34 6800 34 6.t~ O0 3S ~ .,0 33 71 0'0 32 72O8 31 73'0:0 .3 0 74.00 29 75.00 29 7600 28 77.0:0 27 78 0 O 26 79:0'0 2,5 80'00 24 8! 00.2.7 8200 22 49 46 33 .O 22 7 44 7 48 47 52 40 °,9 28 i 8 20 25 47 5 I 27 22 T R U E './ER T I C:AL DEPTN SUB · 5141 5224 5305 5386 5467 5548 5629 57i O ~ '? ,,_,., 5873 5955 603? 61i9 6202 628'1 6367 6451 6535 6620 6706 6793 6880 6967 '7056 7145 7235 7418 751 0 41 5061 .66 '03 5144,28 78 92 52.'07, i 7 63' 5.~o" · ..... ~., ,"' 88 28 ' 54.68.53 2.6 554'9,5 i 54 563 O, 79 1::'~ 5712,38 ua. 5.794, 1 i 76 5876,0 i ..-. g~ q ~ ...~ 98 6040 o~ 12 6i22,77 64 6204,'~.~' '77 6 .:~o 7, '~ "' ~7~. 6371 ,62 69 6540,94 P;2 ..... '" ,77 03 6713.28 96" 6888,21 ..~7 ' '~' , 8~' 8 O 7 066, 05 80 71= ~,6, 05 .... ,, 24~, 84 12 7378,37 44 ' 7430.69 DRIFT D I AEC DEG, TOTAL COORDINATES CLOSURES DISTANCE ANGLE D t'1 DOG LEG :.EVER I TY DEG/1 0 OFT 4.28,34. S 447,61 S 467. 17 S 486,66 S 505,97 S 524,97 S 543/,!.~6 S 561 ,~:54 579 951 77 W 1043 71 i004 71 W 1099 90 1058 86 W 11,57 34 i113 98' W 1215 64 1169 77 W 1274 5i 1225 75 W 1333 44 1281 44 W 1391 '31 13146 82 I.,i 1449 97 O1 22 iO O0 82 ii 52 12 1876.5i B 2012,73 597, :E~)s, e!4ti'fio 1565 , ,, ~, .,. ,,. .-)-..:. .. 614.6'5. ~v.,.., 15,u i F..~..Fi~:,W,~. 1 6z2 ~ 4 ~t ~ 4,"s A::,'6-1 o U'ir~¢r~{~a[k~y¢~ 6 ' .~!,. ,. 665,53 S t664.72 W i792 68i,85 S 1718.81 W 1849 697.66 S i772.i4 kl i904' 7i:3,.04 S 182'1.,76 W i959 727.88 S S 65 S 65 S 66 S~ 66 S 66 S 66 S 67 S 67 S 67 S 67 S 67 S 67 S 68 S 68 S 68 S 68 S 68 S 68 741,89 S 755,23 .S 768,2,.t. S 781 . 05 S 793,47 S 805,47 S 817,01 S 827,67 S 837,28 S 845,84 S 85~, 35 S 1927.21 1976 76 2025 19 2072 67 2118 78 2163 56 2207 20' 2249 45 2290 26 2329 62 2367 29 2065,07 S, 68 2116,t2 S 69 2166.0! S 69 2214,92 S' 69 2262,49 S 69 2308 63 '" , o 6'9 2J53,56 S 69 2396,88 S 69 2438,51 S 69 2478,42 S 70 2516,40 S 70 .667 ,950 ,791 ,478 .378 ,295 417 i17 433 i58 129 ,205 ,543 ,67i ,453 ,893 .917 ,633 ,701 ,068 ,800 ,772. ,243 ,867 .242 , 093 SECTIOH b I STANCE I 0'29 06 I 085 1 ~ 1142 50 1 200 75 1 '"59-- 6 0 1318 57 1 377 l 2 143= ':~- 1550 51 i607 80 1 664 78 i7°1.-- 82 I 778 80 1 835 25 i 89 0 85 1945 65 1 999 47 2 052 06 o 1 03 38 2153 52 2202 66 :"250 45 2296 S 1 2341 95 2385.52 '2427.44 2467 .'68 25 06.03 SOHIO WELL S-21 SEC'. ~i,. TilN, RI4E GYROSCOPIC SURVEY dOB $41335 SURF'AC:B LOCATION 6?4'SNL. IE:96'WEL 11 JAN. 83 NB ELEV, 79,75 FT, RECORD OF SURVEY TRUE NEAS. DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA DI'REc : D M 'DEG. TOTAL COORDINATES 0:0 2i 8 7603,42 752'$, 67 S79,97W 84:0'0 ,20 26 7696,92 .7617,i7 $80,68W 865,96 S 24.38 85.00 zO ~ ,",'~0,,'~ 77i0,98 S82,70t0 ~70,96 ~ "' 2472 8600 19 55 7884 70 780 . . ,. :,~.. 2SrO 874 56 S 2506 870:0 i9 .r,o 7978 88 7~''' ..... ,=.~ 1~ S~:6 'BOk~ 876 86 S 2540 ... ~'" o~ 7~q' ' .. , 257 .8800 19 2 90,,~ -' ~,.~ c,~O0 18 48 8i67 ~2 8088 17 N89,42tO 877t~.9.8 S~.b05 859.99 $ 2403 48 W 46 W 72 W 73 W 26 W C L 0 S U ~' E S D I STAt,ICE ANGLE D H S 2552 ?1 S 70 i8 43 W 2587 262~ 2654 2687 271.8 2749 66 S 70 26 55 W 6,3 S 70 35 46 W 'Bi S 70 46 i W ~5 S 70 57 21 W 79 S 7i 9 37 50 S ?i 22 40 W 9000 19 5 8262 9100 '18 47 8357 9200 18 55 845~ 9300 19 22 85,,1.6 94,00 18 ,46 8E, 40 95.00 18 ii 8735 9600 17 58 8830 97.00 17 46 8925 q.,~.:~ '0:0 I 7 26. 9 02 l '! .~0 17:12: 9116 lO000 'i7 38 9211 101.0'0 i7 13 9307 5 0 8 i 82 09 8277 73 ~ 8371 ,. 20 8466 7 i 856 0 .,. r=., 86~5 62 8lTM 80 884.6 '12 894, 1 842,80 S 2827,16 W 83.~,80 S 2856,49 tO 824. 25 = , ~ 2885,18 t,,l' 'R'-' -'" = I ,:. r N r ,.,, 5mt,. 05 'tqT'2,.33W 37 1"17 0, ~'.,..,,, 2950 2975 3000 ~AC~~, 3049 3:073 THE FOLLOWIHG IS E,XTRAPOLATE[~ TO TD 10200 l? 1.3 94 02,"~ '~22,92 ' ''" = . t,., '.~.. . N ~ 8, ,.. 2 W F8'l 87 '? ':~' , ~. ,..997 5i W .~ , FEET AT S .75 22 5'0 'W BOTTOM HOLE CLOSURE ._097 81 DOG LEG SEVERITY DEG/IOOFT ,922 ,705 .4,23 ,338 ,580 ,420 ,269 ,312 ,424 ,292 ,658 ,689 ,584 ,253 .230 ,359 28':' 086 ,422 .000 SEC T I ON D I STANCE · 2542 73 2578 08 26 i 2 49 2646 '2679 34 .-"~7i i41 2742 79 ,='~774 02. · :, o 0 4 9 O 2;335 16 2865 1'" 2894 02 2921 58 '2948 35 2'974 46' 2999 81 · 3 024 75 3049 ..~.=,'~ 3 073 89 3 097,81 ~ UR./EY JOB #1335 SOHZO biEI. L B-'21 GYROSCOP-'[C'. q SEC 3i, TI IN., Ri4E SURFAC:E LOCATION 674'SNL, 189E.'tdEL MEASURED [:'EPTH AND OTHEP.. DA]"A FOP, EVERY EVEN lO0 FEET OF SUE. SEA DEPTH. T RUE ME¢~SURED VERT ICRL SUB t'ID-TVD VERT I C:FhL DEPTH DEPTH SEA DIFFERENCE CORRECTION 'FO T~:~L COORDINATES 0 280 ,38 Q ( 4{90 580 , · 1180 1280 ~ 480 ~688 'l 78 O ~ 9 S 0 {" 2oso .2i 80 228 0 2380 248 0 268 0 27o'n 0 288 0 298~ ~082 .. 61o3 ~492 i i 28 0, 38 0 58 0 680 78 0 1180 '1288 ~ 080 ~ 480 i 790 i '8 :~ 0 2080 219 0 22 ,S 0 e, 48 0 o"'~' o 0 288 0 ~080 3180 328 0. Z42480,, 348 0, --80 i O0 200 300 400 500 600 700 800 900 lO00 l JO0 i2OO I300 I '-1, 00 1500 i600 iTO0 i 800 Igo0 2:00'0 ::'. 1 00 2:200 2300 2400 2500 26 O O 2.700 280 0 2"900 3000 BIOO 3200 3~00 73,1.00 , 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 o 0 1 5 7 1 ,00 ,22 ,19 ,22 ,25 ,37 - 1,4.5 Scientific , 36 "-'11 ,-,,' 1 ...... I'" 3.38 3,95 4 ,~2 5,04 5,80 6,58 7,63 8.54 9,7~ 10.40 12,27 14 ~9,82 26,34 ~3.39 50, ~4 62,74 S N N N N N N S S S S $ S S S ,'3 S S S' S S S S S S S S S S S S S ,00 ,54 ,27 ,15 .t6 ,17 ,51 i i2 1 3.5 1 5.3 I .39 i 73 2 25 2 4. S 2.69 2 49. 2 50 2 2~ 2 46 2 58 319 B 69 4 53 ~ 94 5 24 5 15 ,46 8,7i 20,75 35.78 54,05 75,98 t01 ,79 k:8 ELEV. E E E E bi E E E E E E E E E E E E E E E E E E E E E t,J td td t~i 1 I JAN. 83 7'9.75 FT. , ; SOH!O WELL B-2'I SEC: 31, TliN, RI4E I'IEASURED DEPTH AND OTHER DAT~ , GYROSCOPIL'; '-'1 '~ z. LR.,E~ JOB #13,75 SLIRFACE LOCATION 6'?4'SNL, 1896'EIEL FOR EVER"? EVEN 100 FEET OF SUB SEA DEPTH. W8 ELEV. 11 JAN. 8`7, 79.75 FT. T R U E I'IEASURED VERTICAL SUB DEPTH DEPI'H SEA 3597 .-_470,-$ .3812 3922 4 034 -1149 4264 4384 4498 46I e', 4734 4.852 4.970 5088 5207 ~=.: --, .::, ..- 5446 5568 569t 5815 5939 606 ;::.'. 6185 6:307 6429 655i 667:3 ¢794 6914 703,4. 7'152 7269 7`7,85 7500 7613 3'580 2;688 · ;:478 0 S88 0 3980 4088 4. 18 0 4280 4`7,80 44,80 4580 4680. 478 0, 4. S 8 0 4980 508 8 5180 526.:0 5~80 5480 578 0 5880 5980 6 08 0 6180 6280 6380, 6480 o t.~'58 0. 6680. 6780. 688 0, 6980, 350 :360 370 S80 390 4 00 410 420 430 440 450 46 0 4.70 -i80 490 5 O0 520 5.4 O 550 560 570 580 590 600 6I 0 620 6300 ,!34. 0 0 650'0 66 O 0 6700 6800 6900 I'1D - T V b V E R T 'I C A L b IFFERENC:E CORRECTIOH TOTAL COORDINATES i 7 23 7:; 2 4. ':2 5 4 84 J 01 118 t :36 171 189 208. 227 246 266 ~ i i ..~ ,.,~ ~ 4 05 427 449 4.71 534. 554 572 589 604 619 6 77,52 S 130,79 6 94,88 S 164. o 0 9 I14,02 S 200,95 IAi iO 1..4 93 S 24i 84 W 12 157,81 S '287,94 bJ 14. 181 ,57 S :337,..'38 W '16 '~n~' 85 S -'"'"" · ..,,.:, :.~ 55 17 2`7,.0,4.5 S 444,81 W 17 o-~ 07 "--' ---b.~, o 501 ,60 W iS '27903i S 558.95 kt :~".":: 18 '7'02,77 S 6i6,43 W ;i:i:.i: 1..,7' .. ','i /q::::-, ¢:"'.'.a.:. ,,,,., ,, .,~ .725,42 S 67'4 , .: i':9-";~:~'i:'' ~'"i>? ..,,':I c, - 792 .~... "~9'."~, i.r~S 852,44 "':i9 ';,":'-. , , "";:~14,35 S 913,,7,1 W ". ....... t ! ", I (.'.,' K r'l ~ip' ', 20 .,;. ........ ~l.~?., I 9 s 976, I 0 IAi 2~. 460,92 s 1041 ·4.4 w .23 484,94. s 1109,08 w 24 508,86 s 117'8,19 w 24 532,2'1 s 124.7,44 w 2:3 554.,73 s 1S1,.:,8G., w 2.3 .~'~','- 65 s .1,~83 .~-1'~ 22 598 ,7,0 "' -' . . , ._~ i 4 =, o, 6 O ~",o,_- 6't9 ,74. S 1~:.., 1 -,", 14. ")'-"~.. ~,40 ,58 S i~8:3,_ ,44 22 ' 661,01 ...P-, 164.9. ,,.:~'. W 21 68~),90 S 1715,62 W 20 "'<': " , 2.0 718,i4 S t~42,37 W le 7~5,27 S 1902,98 17 -"'= "' ,..,1,14 ~ 1961 ,49 W 15 766,26 S 2017.82 W 15 ,':=1 O0 $ ~072 4.~ W 14 795,09 S 2124,8~ W SOHIO ~iELL 8-2~ SEC ~;, T~H, R~4E MEASURED DEPTH At,ID OTHER DA'T~ GYROSCOPIC SLIRVEY JOB #1335 "-" ' :,.4 Bb ' WEL SURF'ACE LUL, Rl iOH 674'SNL, 1"'" FOR EVERY EVEN 1 O0 FEEl' OF SWB SEA DEPTH, 1<.8 ELEV, ( 11 JAN. 83 79.75 Fl". t,1E A S U R E D D E P T H T R U E VERTICAL Si..IE~ MD.-'FVD D E P T H ~ .... .)EH D I F:'FEREiiCE VERT I C:A I._ CORRECT i 0t4, TOTAL COORDINaTe. f 7726 7948 8.058 8167 8275 8S82 8488 8595 8701 88.07 8913 90i8 9i 24 9230 9441 9546 9652 97,5,7 9861 9966 007t 0176 0200 7 080, 7 000 6.46 7i 80, '71 O0 658 .72 E'. fl ,, '-" 00 bbb 738 0, 780 O 67't~,. 748 0. 7400 687 7580, 7500 694. 7680. 7600 70'I 7780, 7700 788 F,~ 0 7800 7 i,4 81 ~ O, 8 i 00 7~2 928 0. 82 00 7'38 ~ 0 00 744 848 0. 84 00 ~,' 4 q.. ,,~ 5 ~ 0 ,, 8 ~ 00 755 ~L~O', 8600 8¢c. 0 8700 766 8880,. 8888 771 8980, 8900 776 9088, 9088 781 9180, 91 00 786 :;,,..~0, 9200 791 ""~ ~ I "~ 9.~ ~ 0 9 ~ 00 7 ~ 6 9403 , ~ "" r.¢3Z~' 79? 13 8'08, 54 i 2 82:1 , 17 1.0 832,46 I 0 84'2, 40 9 850 ,97 7 8,.,8,38 7 864,9 1 · 7 87 0, ,-t. 4 6 ,.: ,' 4 40 7 876.88 6 87'7 '98 877,94 e?o, 84 s ga64.37 s Interr e,b iigO b3 s 847,39 S 838 22 '* 8~ ,,;7 S 8i8 09 '* 8n7,. 09 S 7.85,82 S 784,47 S .781 ,87 S 2223,7~9 b.I 2269, S8 W 281 3 ,.38 W 2354 2394 2432 2468 2504 2540 97 W 4.2 k; i2 &l 73 W 94 W 57 W 2575,35 W 2609,58 W 2643,95 W 2678,08 W 27 i 2,09 W 2746.33' W 2779.4 0 W 281 ~., 25 W 2842,76 W 2872,82 W 2902,63 2932,51 W 2962,03 W 2990,90 W. 2997.51 W . SOHIn UELL '~- -' T ii ,.~'L. .71 , GYROSCOPIC SL.IRVEY SURF'ACE LOCATION 6. ,::4'SNL.o JOB ~.1335 1896 14B ELEV, I I JAN, 8.3 79,75 FT, , I I',IT ERPOLA TED H E A S U R E D DEPTH 0 'I, 000 2 000 3 O00 4OO 0 50:00 6 00 O 7'000 80'00 9 000 lO000 1020 O VALUES FOR EVEN TRUE VERTI CAL DEPTH 1000, 2000, 2999, .794.9, 4805, 5629. 6451. 7327, 826.7, '3212, 9403, t000 FEET OF i,)EASL.tF.:ED [:,EPTH, SEA T O'I"A L C:O ORD I NATES -80 92O i920, 29i9, ~870 4726 5550 6B72 7247 9323 4 21 )50 .'...453 8 03 781 O0 48. S 45 S 2, O0 69 S 27.7, 4.2 $ 46 S 04 S 1824 28 S 2290 31 S 2638 s 2...-,,,42 O0 27 E @i 41 76 iii 26 t.,J '80 04 t,..I : :' ':-1": :' :'-:l ':-:': :'i:-:: :'! :'"':-: t:;'-':--:-;' :- !-h~)'"'~,6-i,i'TX'L-; - ' -~ .... - ~ ....... ~ - - ---: ~-~.- .......... ~ ..... GYROSCOPIC SURVEy- ' .... ................................. ....... ~ [~ ............. i' 674*'S~;~I896'SURFACE :LOC'ATIO N- ::~ ........ ._.. ..... ~ ...... ......... :'~'-'- .... -:"'-~ '::~:TC:--:::~ ' ..... ~ ,,~ ~ " ~ - ~ ,. ~ ~ ..... .~ . ..~j ... SCAgEL. 000: . _ ~ ....... ' - ' ' ' ' i .. ~ ~ '1 . t - ~ - ! ; , . . ~ . , { ~ - , t -~~--~ --T~tl-N.i ..... ~ .... ::t ...... :'t- T--f ................. k"-: .....: ....... f ..... :- ...... 1-:~T:x~-m 1-' --:--J .............. ~ :- ................ ~ .... x_: t:: ::-.::-J:-::::J__: ..... ~-_: :.:-t::-.: :_u -:_: .:::i~:-:;.:-::-~-:-:-:.':-i ~ j ; ~ , ,, ~ .. , ' _ .~ - ~ ~ ~ , . : ..... ~ ...... ; ........... ~ ..... ' ' , '. ~ ~ : ......................... ' ............. ' ..... I ........ ~ ...... - 'i ' ' ~ ..... { ..... ~ ............... ; ..... ~ALL DEPTHS HOWN ...... - .... ' - ~ .... ~ - '': ..... ' ' ~ ~ - ~ : ~ .... ~ .... ', " ' ~ ' _~7.: ~: _TX:X - ~: :--J-':'-:7~TP:':__; i_M_-__: ~:::-.-:--- i_.i/:::q:_;--T - - I ......... ' ..... ' ..................... ~ .... ~ - i = ~ -/[i-: ; L ' _ ] ' ~ I ~-- ~ .... J .... ~ ...... I ....... ~ .....J'-;~--J ........ ~ ::-~ : vy T]. ::- -:-t: Suggested form to be inserted in each "Active" well folder to ckeck for timely cca~liance with our regulations. OPerator, and Number Reports and Materials to be received by: Required Date Received Remarks Completion Report Yes Well History Yes / _samples ~' ,'~ ~ ~0 / Mud Log .~..~ Core ~scription Registered ~ey Plat ~~ Inclination S~ey '~/0 " ..... Drill St~ Test Re. ms .;,,[~.,~. :~:.p~ .- >: .. .-- - ~s R~. Yes Digitiz~ ~ta ,/ M EM O RAN DU M Sta' 'e of Alaska ALASKA O~L A~,~D GAS CONSERVATION COMMISSION TO: ~!~~. DATE: C. on December 1, 1982 Cha / ~_/' FILE NO: 108/C ' Thru: L~nnie C' Smith~ C~mi ssioner Doug Am, os Petroleum Inspector TELEPHONE NO: SUBJECT: Witness BOP Test on Sohio ' s' ~.-21 We! 1 Sec. 31, TllN, Ri4E, PerEdt No. 82-176 on Alaska United. Rig No. 2 _S__un~day, November 28, 1982 - I traveled, this date from A~chorage to Prudhoe Bay to %-~tness the BOP test on Sohio's B-21 well. ~¢onday, Nove~.~.. ~ ,29,_ 198~2 - The BOPE test commenced at 5:00 ~.m. an~ ~ms concluded at 6:30 a.m. ,. there were no failures. I fille~ out an A.O.G.C.C. BOP test report which is attached. In summary, I witnessed the SUccessful BOP test on Alaska No. 2 at Sohio's B-21 well. United Rig · O&6 #4 4/80 Inspector STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P E. Inspection Report Date Well Operator ~ ~//~ - Representative Well ~ -- Z/ Permit -~ ~Z-/7~ Location: Sec ~/ T//~ R/4~ M ~,~. /~Casing Set ~ Z~ . Drilling Contractor~/t~D ~, Rig ~.. Z Representative ~~7~ ~/~~. Location, General ~/~' Wel 1 Sign ~/~ General Housekeeping ~/~ _ Reserve pit Q/y- Rig ~ BOPE Stack Annular Preventer. Pipe Rams ~/ ~)/L Blind Rams- ~'~ Choke Line Valves H.C.R. Valve Kilt Line-}Valves Check Valve ~ Test Pres sure !1 ACCUblULATOR SYSTEM Full Charge Pressure ~~ psig Pre,sure After Closure /-7~d) psig .200 psig Above Precharge Attained: Full Charge Pressure Attained: ~ _ ~::~'~ 1~(-') ~-l~0 ' ' Controls: Master . ~ Remote -~ Blinds switch cover Kelly and Floor Safety Valves Upper Kelly / ~Test Pressure Lower Kel;.1y / ~Test Pressure Ball Type / Test Pressure Inside BOP ? Test Pressure Choke ManifOld / Test Pressure NO. Valves /~ No. flanges. . Adjustable Chokes Hydrauically oPerated choke . . Tea t Re cults: Fa ilures ./u/~.,o~ Repair or Replacement of failed equipment to be made within Inspector/Commission office notified. min~ sec mind.sec Remarks: Test Time _/ hrs.. .~ days and '~' ,... ....' L/( /Ii' Distribution orig.' - AC&GCC cc - Operator. cc - Supervisor Inspector November 2, 1982 i~. R. H. Reiley District Drilling.Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 · ' i Re. prudhOe Bay Unit B-21 Dear Mr. Reiley~ It has come to my attention that the October '28, 1982 cover letter to your Well Permit Application for B-21 has an error in the second paragraph. The paragraph now reads "if coring ...... Samples of well cuttings and a mud log are required ..... " It Should read "...Samples of well cuttings and a mud log are not required..." Sorry for my goof! CVC :be October 28, 1982 Mr. R. N. ~iley District Drilling ~ngineer Sohio Alaska Petroleum Company Pouch 6-612 Anchoz~ge, Alaska 99502 .Re: ~Tu dhoe Bay Unit B-21 Sohio Alaska Petroleum C~pany ~~t No. 82-17'6 Sur. !_~c. 674'S}~L, 1896'%~L, Sec. 31, TllN, R14E, UPM. Btmhole Loc. 1683'SNL, 61'W~L, Sec. 36, Tll~:, R13E, UP~. Dear Mr. Reiley~ Enclosed is the appro%~d appli~tion for ~mit to drill the above referenced well. If coring is conducted, a one cubic inch chap from each foot of recovered core is re~ired. Samples of well cuttings and a mud log are r~q~ired. A continuous directional survey .is required as ~r 20 AAC 25.050(b)(5). If a~ailabte, a tape con=aining the digitized log information sP~ll be submitted on all logs for c~ying except ex~ri~ntal logs, velocity surveys and ~i pine ter sur%~ys. ~fany rivers in ~iask~ and their drainage systems have been classified as important for the spawning or migration of anadromous fish. O~rations in these areas are subject to AS 16.05o870 and the regulations promulgated thereunder (Title 5., Alaskm Administrative Code). Prior to commencing o~rations you may be contacted by the }L~bitat Coordinator's Office, Department of Fish and Game. Pollution of any' waters of the State is prohibited by AS 46, Chapter .3, Article 7 and the regulations promulgated thereunder (Title 18, Alas~ Ad~nistrative Code, Chapter 70) and by 'the Federal Water Pollution Control Act, as amended. Prior to com~ncing o~rations you may be contacted by a kepresentative of the Depart~-.~nt of Enviro~nta! Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to com~ncing installation of the blowout Mr. R. ~. Reil~/ Prudhoe Bay Unit B-21 -2- October 28, 1982 prevention equ. iPment so that a representative of the Commission may be present to witness ~sting of the equipment before the- surface -easing shoe is drilled, 'Where'a diverter system is required, please also notify this office 24 hours prior to c~mencing equipment installation s° that the Commission may witness testing before dril~ng ~low the shoe of the conductor In the event of suspension or abandorm~nt, please give this office adequate advance notifi~tion so that we may have a witness present. Ve~ truly yours, C. V. chat~e:r~on: Alaska Oil and ~-s ~ons~-~i~~''~t~'~stOn Eno 10 s~re cc: DePar~nt of Fish & ~, Mabitat Section w/o encl. Depart~nt of ~ronm~ntal Conservation w/o enclo CVC .. be SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 October 22, 1982 Alaska Oil & Gas Conservation Conmlission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentleman: WELT. B-21' (12-31-11-14)~PBU Enclosed are the following documents, in triplicate, along with our check for $100 to cover the permit filing fee. 1. AppIication for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram; 4. Surveyor' s plat showing well location; 5. Directional map. If vou have any questions, please call R. H. Reiley at 263-5183 or K. W. Kolthoff at 263-5176. Yours very truly, encs cc: Well File 917 R. H. Reiley District Drilling Engineer 0CT251982 AlasRa Oil & Gas Cons. Anchorage Commission ~- ~-~ ~-- STATE OF ALASKA ~-- ~-. ALASK. .,._, ,D GAS CONSERVATION ~,.,N. ~,SION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL ~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE ~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum ~y 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 674' SNL, 1896' WEL, Sec. 31, TllN, R14E, UPM At top of proposed producing interval (target) 1600' SNL, 200' EWL, Sec. 31, TllN, R14E, UPM At total depth 1683' SNL, 61' WEL, Sec. 36, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF etc.) Est. KBE = 75' AMSL 6. Lease designation and serial no. ADL 28310 9. Unit or lease name P~__~_hoe Bay Unit 10. Welt number B-21 (12-31-11-14) PBU 11. Field and pool P~3_dhoe Bay Prudhoe Oil Pool 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Safeco Ins. 2975387 Amount $200,000.00 15. Distance to nearest drilling or completed SE we, A-2 - 1600 feet 13. Distance and direction from nearest town 14. Distance to nearest property or lease line N~ of Deadhorse - 10 miles East of ADL 28286 - 200 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 10203' MD - 9367' TVD feet 2491 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures i KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 29 Ol (see 20 AAC 25.035 (c) (2) i 21 i Hole 8 1/2 18. Approximate spud date November 25, 1982 33_q~ psig@ Surface 4~O)[~ psig@ ~R~J_I~ ft. T~TVD) Proposed Casing, Liner and Cementing Program SIZE Casing 20x30 13 3/8 72~ 9 5/8 479 7 26~ 22. Describe proposed program: Weight Insula- CASING AND LINER Length SETTING DEPTH MD TOP TVD 80 Surface 2680 surface Surface I Grade /CouplingI C?n ctor I L-80 I Butt' I ,-80 II I MD BOTTOM TVD 110 2680 8451 9154 8904~ 8232 I 1299 See attached proposed drilling and completion program. QUANTITY OF CEMENT (include stage data) 110! 26801 91541 1268 cu.ft.Class G; ' I 102031 9367 324 cu. ft. Class G w/18% salt As shown on the attached 8 cu.¥ds, concrete 3720 cu. ft.Permafrost 130 cu. ft.Permafrost directional plat, we are aware of the potential intersection problems which can result from the drilling of this well. If during actual drilling operations, one of these intersections is approached witkLn hazardous pro_~nmtity, the well to be. intersected will be shut-in. i 23. I hereby certify that the f~regoing is true an(~ correct to the best/of my knowledge ~ IA "~ ]" .{,, ~ I Vistrict Drilling Engineer Th; space below for Commission use Ro H. Wiley / RECEIVED OCT 25 1982 Alaska Oil & Gas Cons. Commission Anchorage , I DATE j._[~ ./L~/~ Samples required []YES ~[~XI O Permit number APPROVED BY CONDITIONS OF APPROVAL Mud log required []YES ~.O A p p~uafi~l_d_a t ~ _ _ Directional Survey required )~.YES []NO JAPI number 50= o z. ~ - SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER by order of the Commission DATE OctQber 28, 1982 Form 10-401 Submit in triplicate WEI,L B-21 (12-31-11-14) PBU PROPOSt~ Di~T,T,~ ~ O31~L~'i'~(l~ PROGRAM Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu. yds. concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3720 cu. ft. Pezmafrost C cement. Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottle pressure is 4390 psi at 8800' TVDss based on origiDa] reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8455 , TVD. Run 9 5/8" 47# L-80 Buttress casing to 8451 ' TVD and cement first stage with 1268 cu. ft. Class G cement. Cement second stage through D.V. packer collar at 2600' with 130 cu. ft. Permafrost C cement. The 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. DJ~ectionally drill 8 1/2" hole to T.D. at 9367 ' TVD. Cement 7" liner to 250' inside 9 5/8" casing shoe with 324 cu. ft. Class G cement with 18% salt. Run 5 1/2" 17# I~80 A/B Mod Buttress IPC tubing with 13 g~s lift mandrels and a production packer assembly at 8233 ' TVD. A subsurface safety v~lve with dual control lines will be placed at 2150 '. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to'rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. B.O.P - C;TACK CONFIGU -TION 1:5 5/8" TRIPLE RAM STACK I II 5000 PSI WP DRILLING ANNULAR PREVENTER PIPE RAMS BLIND RAMS 2' KILL LINE CHECK GATE GATE DRILLING SPOOL PIPE RAMS CHOKE LINE HAND GATE H Y DR. GATE ! 30 . 40 a~ ~1o 20 ~ 4O I0 ; 20 I -:25 30 : !' I 031 -o B-18 ~ B - 20 · B_I9 ? ~o (Proposed)] ,( PropdS ed) o,: ~ I t~ B-18(AsmBuilt) I ~ I ~1 LAT. : 70° 16' 14.08" I =~x:: 663,731 0~ ~ Y = 5,950,300 ': 36 ..... 3t '. _tP,o,o,~) 3:2 - J SUMP T-lIN. T. ION. WELLS PAD DETAIL PORTION OF T II N, R 14 E, U.M. SCALE I"=1/£ MILE CERTIFICATE OF SURVEYOR SCALE I"= 300' I I hereby certify that I am properly registered to practice land surveying 'in the State of Alaska and that this plat represents a location survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and all dimensions and other details are correct. Bottom hole locations are furnished by others. Date L, McNeil Sheet 3 of ;5 PAD "B" EXTENSION Located in NE I/4 PROTRACTED SEC. UMIAT MERIDIAN Surveyed for SOHIO ALASKA PETROLEUM CO. Revise B- 18 Surface Location from proposed to os- built. (~L~-M 9 / :50/ 82 Add Proposed 8HL e- 2',2Z,23,24,~ 25 ¢~ 5 /27/82 Revise B-18 surface location,odd proposed bottom hole location B - 20 ~T~ ~/4/82 REVISE B- 18 ~ B- 19 BHL. ~LH I / 5 /82 Surveyed by F.M. LINDSEY I~ ASSOC. LAND ~ HYDROGRAPHIC SURVEYORS PSO2West Northern Lights Boulevard Box 4-081 Anchorage Alasko INTERSECTION MAP FOR WELL B-21(12-32-11-14) OCT ~L~i~82 Alaska Oil a Gas Cons. Cornmis~,ion Anchorag~ ~LL I~ TUD ~T ~g ~-3 ~.Z 7~.I 3444.E ~.~ ~364.9 3319.4 ~ .6 ~476. { ~4 ~4.9 22i~.4 9~4.5 5~t~.3 ~8 9~4,9 33i9.4 ~5.9 3087.6 ~-s ~7~.7 e,e a6~,4 i3,5 R-ia to.5 e.e ~.e S-i3 tO.9 e.e e.e a34~ a-14 le,? e,e e.e ~ ~-17 45~4,~ ~,4 4639, 4 838.9 a-g ~364.9 ~19.4 g463.7 ~GS3,4 DI~TRNCE E~7 o 44~e 4i34.1 33"? TUD 35B.8 431 ,g 1533,2 142r,.3 I317.g 999.3 598.9 5~1.3 792,8 ~7,9 4tE6.E ~67, t 9364.9 R7$UO~ · BoZZ a494.6 e.e R499.8 THE BELL UHIOH CO,ES CLOSEST TO THE PROPOSED {dELL IS ~ CLOV~Eirrz~ERK~W~BRaE6T&ER~E - tOG,7 FEET /I~O{~BIIED RE_PORT /H£RRBV~ UERTICRL DEPRRT TUD DEPRRT DIGTRNCE CLOSEST RJ~eI~O~CH FO~ ? {~GREE LERO ~LL E~ER ~ REPORT TITLE ? 926.8 65~4.e 'i-~4,0 i474,~ ~----- 4t~E~,9 4646.6 .B46,i OCT g Anchorage 7° -21( TUD:~ -?5,00 ~?l~oe ~-a3 a743oo A-,Z4 THE ~£LL MHICH CORES CLOSEST TO THE PROPOSED UELL 15 ~75900 B-1 a~?6ee ~-1~ R33i~ A341~ B-13 ~4~ ~14 B-iT B-Ig CLOSEST RPPROfl L%~ " 14,~ ~.0 o.e o,o ~01,9 t1~.3 0,0 1~,~ .7 418,5 af5.4 ~.~ a~,{ 1,~ ~.1 33~.~ 7~. 1 344~.6 1~-$ ~81-9 a~S.? ~.0 26~.4 I3.5 337.6 a~.a e.e aee.e . te6.a e.e tee.e .i ~a7.7 ~,e o.o ~799,7 t?.9 43i.B ~0.8 O,O O,O O.O 1~33,a i~.g ~.~ 0.~ 0.0 131%9 tLS 9.? 4445.4 584.4 45~.? ~6.4 ~,4 g~,g 33Ig,4 g~3.? ~53,4 3?98.6 39~,0 ~.3 ~993,3 51,6 282.4 aez,~ e,o ;ea.O . t aae.e 4R94.4 :!134.8 6~'I1 .~ I16~..3 40?8.8 380,6 459i .g 791o5 CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. j": /4 ~.~ ITEM AP PROVE DATE (1) Fee (/,,,:,,", (2) Loc ! *' ~'f'~'~-~" thru 8) thru 11) 10. 11. 1. Is the permit fee attached ............................... ........... 2. Is well to be located in a defined 'pool ........................ ,... 3. Is well located proper distance from property line ........ ' ....... 4. Is well located proper distance from other wells ................. 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ................................. 8. Can permit be approved before tenTday wait Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... YES NO R~ARKS (4) Casg ~ .//~'~/ /~-~27o~'~-- (12 thru 20) (5) 'BOPE ~ tt,~'-igT-~J- '('21 thru 24) (6) ,,..Ad 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 23. 24. 25. Is conductor string provided .................................... Is enough cement used to circulate on conductor and surface ..... ii!! Will cement tie in sUrface and intermediate or production strings Will cement cover all known productive horizons ........ , ........ Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well'bore separation, proposed ........................... Is a diverter system requi~red ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... Does BOPE have sufficient pressure rating - Test to .~t~-~ psig .. /AP1 3 (F 78) ' Does the choke manifold comply w RP-5 eb ................... /lIb F 608pI I'TT£ID Additional requirements ............................................. Additional Remarks: o Geolosy: Engineering: . rev' 08/19/82 INITIAL GEO. UNIT ON/OFF- POOL CLASS STATUS AREA NO. SHORE , l,-o,..:) 11 o/v Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. . No special effort has been made to chronologically organize this category of information. ALASKA CO~PUTING CENTER * ******************************* ******************************** C('t~DANY ~ifA~!E : STANDARD ALA$:KA PRODUCTION CO, FIEI, D N~E : PRUD~OE S T A T F, : A [, A S ~ .A 80ROU(.;H : NORT},,{ SLOPE ~pI ~:~I.t~t~E:R : 50~02g~20850 REFERENCE NIl : 72998 Tape ~er~ficat, Ion Llstt, nq ~ch'lUmberner AlasKa Computl, n.q Cent:er 7-NOV-1988 1' 6'.24 **** RFEI., ~iEADER $..~RVlCE NA~,IE : EDIT D,i~T~ : 88/11/ 7 ORIGIN : FblC REEL NA:~E : 72098 CONTINUATI O~.l ~ R~ P ,EVIOUS REEL CON~ENT : ~OlT LIS,Sq, ANI..ARD PRUDH'DB BAY, B-21 A'PI 50-029 20850 **** TAPE HEADER DAT : 88t111 7 TAPE NA~E: : 72998 CONTI.NUATION ~ : 1 PRE%IOUS TAPE CO~ENT : EDIT LIS,STaNDARD PRUDI~OE BAY, B-21 API 50-029-20850 FI5~ NA~E : EDIT .001 $~RViCE : FL',IC VERSION DATE : 88/11/ 7 NAX REC SIZE FISE TYPE LAST P'II.,E PAGE~ ************************************************************************************ * SCHbU~BERGER * , ..~I.,~SKJ~ CO~4PUTING CEMTE~ * ************************************************************************************ COMPANY = STANDARD ALASKA PRODUCTION CO WELL = B ' FIELD = PRUDHOE BAY CO!JNTY = NORT~ SB[IPE ~{)~i3UGH STATE = ALASKA dOB ,NUMBER ,a'l! ACC: 72998 RUN #1. [)ATE LOGGF, D: 30-0CT-1988 LOP~ R{lSf~ C~SING CASING TUBING T~ II.,PIPE TYPE FLUID Ft, t.'l [) LEVEL 9.625" SURFACE TO 9358 7,000" SURFACE TO 10198 5.500" SIJRFACE TI) 9178 ~,500" 9178 TO 10435 PROOUCED FLUIt)S FULL ':;,IS Ta~e Verification )chlumbercer .Al. as~:a Cor~out.:i~a Cent. er 16:24 PAGE:~ ~, ATP, IX CH-'L I t~ilE * SCHLU~BERGER t.,OG$ I, NCI..,i~Df,;D WIT}'{ THIS ~AGNETIC TAPE: * * CO~PENSATKD NEI~TRO~ LOG - CASED HOLE (CN'b 3 , GAa~A RAY LOG (G~) * HODGES I,EHMA~J AVERAGE OF NPH] THREE PASSES , TABLE 'TYPE : CUN~ ~,U NI VAL[) DEFI ~TA~r'~''~, ' ~A':DR AL,AS~A PRODUCTION CO Compa, ng Na~e ~,RUDHOE ~tAY Field Bame ~ - 21 Well Name CN F~ WN NATI Nation STAT AbASKA State or Province COUN NORT~ SLOPE County FL 674' SNL g 1896' WEb Field Location SECT 31 Section TOWN lin Township RANG 14E Range LATI Latitude LONG Longitude OPER ~AT~ERT ODer@tot's Code SON 72998 Service Order Number APIN 50-029-20850 APl Serial Number iIS TaPe 'Verification histinct Chl. o. mberqer A.]as~a Comp'K, tln~ Center 7,,'NOV,.,1988 16:24 TA.B!,E TYPE ~ CURV DEPT ~'~ P H NRAT R N R: FCML NIPH ]T'. NlRA R N F C N NC~L CCh NRAT RNR F<N5 N'CN~ CC G GR NPHI DEFI DEPTH CHANNEL NEUTRON POROSITY Neutron Ratio Ra~ Neutron Ratio (Near/Far) Far CNb Detector Coumt~ Near CNL Detector Counts CCi, A~plitude Gamma Ray NEUTRON POROS ~T'Y Neutron Ratio Ra~ ~4eutroD Marlo Far CNI.,, Detector Count~ Near CNb Detector Counts CCh A~'DD1 J t hd~ Gamma Ray TY NEUTRO'N PUROSI . Neutron Ratio (NO/FI)) Ra~ Neutro~ Ratio Far CRb Detector Counts Near CK~L Detector Counts CCh Am~litu~e PAGE~ DATA FORMAT SPECIFICA~...ON RECORD ** SEI, TYPE - 64EB ** . TYPE REPR CODE YAbUE I 66 0 2 66 0 3 73 92 4 66 5 66 6 '1 65 8 68 0 5 9 65 ii 66 12 6H 13 66 0 14 65 FT 15 65 68 !,6 66 l o 66 0 $~hlumr>eroer ~].as~'a Com' '7-~0V-1988 16:24 ID ORDER' '~ LOG YPE CL,.~.SS MOD NURB SA:~P .Ei.,E'.~4 CODE (HEX') DEPT FT O0 0 O0 0 I 1 1 4 68 0000000000 NPHI' PS1 ptl O0 000 O0 0 I 1 I ~ 68 0000000000 NRAT PSl oO 000 O0 0 1 1 ! 4 68 0000000000 RNRg PS1 O0 000 O0 0 ~ 1 I 4 68 :0000000000 FCNL PS1 CPS O0 0o0 OO o 1 ~. I 4 68 0000000000 NCNB PS1 CPS O0 000 oO 0 I [ I 4 68 0000000000 CCL PS1 oo 000 O0 0 I 1 1 4 68 0000000000 G R P S 1 G A P I 00 000 00 o NPHI PS2 P~ OO 0o0 00. o I 1 l 4 68 NRAI P$2 0() 00,0 00 0 RNR PS2 oo 00o oo 6 I I 68 FC,~[~Ps2 cps oo ~c~t,~ Ps~ cps oo ooo oo o ~~ 4 6s ~[5 PS2 O0 O00 O0 O I ~ I 4 6$ ps2 Gapz oo ~Puz Ps3 ~u 0o ooo oo o I i 4 6~ ooooooo0oo N~AT PS3 O0 000 O0 0 1 i 4 68 0000000000 RNR.A PS~ 00 000 O0 0 1 I 1 4 68 0000000000 FCNL PS3 CPS OO 000 O0 o ~ ~ 1 4 68 0000000000 Ps3 cps oo oeo ;, oo o.oo o o NPl.t I HL.A Pi~ oO 000 O0 0 l.i 1 4 6B PAGE: DATA ** FCN[, PS1 NPHI PS2 C N~.NL PS2 NRAT PS3 CCL PS3 DEPT, NPHI,PS2 NCNB,PS2 NRAT,PS3 CCL,PS3 D~PT, FCNL PSi NCNL PS2 CCL PS] 1o137 000 2.58 000 64 Bg3 -999 250 6 887 -999 25o 566,500 19,629 2246,000 4,344 0.000 I0000,000 731,000 20.264 2776,0.00 4.469 ¢),000 NP~!I.PS] 64 NCNb PSi !~$8 N R A T ~ ,PS2 99 CCh,PS2 -999 R NRA, PS 3 6 GR,P$3~ 62 NPHI.PS1 NCN~,P$1. NRA ,PS2 CCL,PS2 GR,PS3 r "PSI. ,~PHI. NCNb,PS1 NRAT.P$2 CCh,PS2 RNRA,PS~ GR.P$3 89] NRAT,P$1 6  00 CCh,PS1 -997 50 RNR,.PS2 -999 250 GR,PS2 ~ 305 FCNL,P$3 2 219 ~iPHI,HbA -999 25,146 2332,000 4,285 0,000 3.529 64.063 NRAT,PS1 CCL PSI RNRA PS2 GR PS2 FCNb PS3 NPHI HLA 19.629 N'RAT,P$1 2788,000 CCL,PS1 4,527 RNRA,PS2 0,000 GR,PS2 4,219 FCNL,PS3 42,906 NPHI,HbA GR PS 50 FCNb PSi ~ NPHI PS3 NCNb 25O 4 879 RNRA,PS1 0 000 GR,P$1 3 758 FCNb,PS2 62 906 NPHI,PS3 629 500 NCNb,PS3 20 508 4.410 RNRA PSt 0 000 GR P$1 4 051 FCNL PS 40 625 NPHI P$3 666 500 NCNB PS3 20 557 6 61 59'/ 19 2222 3 2814 ~/52 500 580 000 t113 o00 55'/ 000 bis Tape Ye:rl, f.icatiou Listl~,r~q SCh 1Umt':. er r as m qe A1 ~ Co r;Ht~no Center 7-NOV-198~ 16:24 DEPT FC~L NPH! NCNL CC,[,, DF. PT NPHT ~CN'I., NRAT: CCI., 36 279 1848 5 375 o 900 4 24 047 "' ' 854 PS1 603 OOC NCN'L.pS1 2518,~91 000 P~2 26 ~55 NRAT. P82 PS2 2702 000 CCL.PS2 0,(>0~ PS3 q. 988 RNRA,PS3 4,527 PS3 O. OOn GR..PS3 20,4.8 4 97O0 000 1842 00o 9 229 5220 000 3 201 0 000 DKPT NPHI N:C~I,~, PS2 NRA, T PS3 CCL.PS3 PS1 PS2 PS3 PS3 78O ~ 25, ,586 3666,o00 5,.020 0,000 DEPT FCN L N PHI NCNI., 9500 000 1431 O0 19 ~73 4740 000 q 031 0,000 DEPT, FCNL NPH! PS2 NCNL PS2 NRAT P$3 CCL NPBI PSI NCNL PSI ~RAT P$2 CCL PS2 RNRA PS3 GR PS3 N P I"l I. P S I NCNL. ['Si NRAT PS2 CCh PS2 R~qRA PS3 G R PS3 NPHI PSI. NCI<~L PS 1 !~! RAT PS2 CCh PS2 RNRA PS3 GR.PS3 9400,000 NPRI,PSI PSI 1576.000 C~CNL.PS1 PS2 15.918 NRAT P52 PS2 4924.o00 CCL~PS2 P~3 3.697 RNE~,P$3 PS3 0.000 GR.PS3 DEPT NPH! NCNL NR.AT CCL DEPT, 9296,000 FCNL,PS1 -999,250 NPHT.PS2 -999,250 NCNL.PS2 -999,250 NRAT,PS3 -909.250 CCL,P$3 '999,250 NP}':I,'PS1 NCNb,PS1 NRAT,PS2 CCh. PS2 RNRA~P$3 OR,Pti3 ** END (DF DATA ** 12 354 5528 ~00 3 ~8 0 000 2 854 16 766 26,221 36~,000 5~148 o;000 4,633 19.500 14,355 4600~000 41117 0,000 3,543 27.984 13 037 4892 000 3 652 0 000 15~ 332 8'15 -099.250 -999.,250 '999,250 '999.250 -~99,250 -.99.25O 1',: R A T. P S 1 C ~ b, P $1 R N R A. P S 2 , GR., PS~ ~ C~L, PS NPHI, HLA NRAT'PS1 CCh;PSI. RNRA;PS2 b:,~$2 FCNL,PS3 NPHI.H. LA NRA',[' PSi CCL PSi RNRA PS2 GR PS2 FCNb PS3 NPHI HI.,A NRAT. PSl COb, PS 1 RRRA.P$2 GR. PS2 FCN b, PS 3 HPHi, HLA 5,465 RNRA ) ~ O, 0 ( 0 GR FCN~ o,soo 28,516 P$I PSi 4 684 RNRA,PS1 0 000 GR,P$1 4.863 FCNb,P$2 20.484 NPMI.PS3 603 000 NCNb,PS3 23 730 3 293 RNRA.PS1 2 FCNL. P~t 1907 00~ ~¢~5 PS3 11 035 5 207 OOO 97~ 3 783 RNRA.P$1  000 GR.,PSl 797 FeNd,PS2 1,2:~ 656 NPHI',PS 000 NCN£,.PS] 16 846 3.523 RNRA,PSt 0,000 GR.PSl 3,281 FCNL,PS~ 149.000 NPHI,PS 1500 000 NCNS.P$3 14:160 -999.250 '999 250 GR,P$1 -999 250 FCNI,,.PS2 -999 250 -999 250 NCN'L,:PS3 58 496 000 3776 1500 000 14 6:00 5000 000 -999 250 '999 ~50 '999 50 -999 ~0 -999 :I[.~,IS Ta~,e verification $¢hlt!~berge~ Alaska ComDut.. [~ Center **** FILM F'TLE NA~VlE : Eg,TT ,001 , -n~ VERS,[U, DATE : 88/1~/ 7 ~X REC SIZE : 1o24, FIbE TYPE : LO bAST FIf, E : **** TAPE TRAILE8 SERVICE NAPtE : EDIT DATE : 88/11/ '7 ORIGIN : ,FLIC TAP[~ NAME : 72998 CONTINUATION ~ : l 9EViOUS TAPE : OM~EMT : EDIT LIM,STANDARD **** REEL .TRA IbER **** SERVICE NA~,~M : EDIT D~TE : 881C~I/ 7 0 iGiN : F,LI R.~EL NAME : 72098 CONTINUATI[]N ~= : P ,:Er OUS: REEL : COMM ~T : EDIT I.,IS,STA'~D.ARD' 1" PRU~.,.HOE' ' '~ '" BAY, B-21 API 50-029-20850 ECC. NUMBER__. 1566.~0 ~ . SOH_.IO ALASKA ._PETROLEUM_COMP_ANY 2~+ C'URyE'S- -: RFO'C..'RILM_ RI!c_D'_-_C.FoC-_'C-!-I?!. czlD_ s.P_'_-'__'.G~'" RFC1 RLM1 RED1 CFC1 CLM! CLD! ~:p1 G'R1 DEN CORR GR~ CAL . ........ . .._ FROM' 2~55'.'00 TO -7000-o00 ........... . ....... LEVEL SP AC Z_NS ..... 0 _. e5.O~ ................... ¢,2, SAMPLES PER RECORD PAGE SOHIO ALASKA PETROLEUM COMPANY D,S. B-21 GR3 AND 'SP'l ARE' RUN-wITH DiFL-RUN-NO.' 1,' D~PTH $R3 SP1 RFC! RLM1 RLD1 FT · API ~V . . 7665. 3~.6 z64. ~, .... O.,.7~__op.oO.._o._ ' ' ~675-, ~0.5 163.~ 0.7~_00oo.o z5.9 ........ ~'~.5-;~ .-'-._-~_o',-o "~-~_~.~-~ ~'~--_.'~_~-_ ~-;~f~--~O'~'b ;_~ ~ o-o ;0 ...... 2705. ~8.6 5~.~ ~.2 6.8 ~.~ ~-~-~; "-~.., ~... '~-_~_~-;?~.'-- -_-~';.'-0-' ~ ..... .--~-~-;'~ -_~" .'~. ~725. ~7,0 ~5.0 3.8 ~.8 ~.~ ....... ..... ~-7~S-, ..... S~-, 0 ...... ~-?;-0 ................ ~--, a ..... L~-~-~ ........ ~-.~ ......... P7~5. ~.0 59.7 ~.~ ~,5 2.8 ......... '-~755', .....~o.o ' '~.~ ...... S-;~ ...... S-.-~ - ~--,z ...... 2765' 59-'a ..... 6'5,2 ~7 ~.1 ......... .- ...... ~?-~s-, ......... -S~.;~ ..... ~s~-~-~.-_~-~ ...... ~;-~-/-~--_~._~-~.-~- .......... ~-,.~---~ ..... ~785. ~1.~ ~5.7 ~.0 ~.0 1.6 . .. - - -~7~-~,- ...... -~-o-.-~ ....... 4~.0 ...... ~--S[~ ...... i_~__~ ...... ~s ........ . . . ............... ~S-~ .......... ~S'.-~ .......... -~-~ ............. ~-~- ...... -~-9-' z.s ' ' ' - '-~8~s. s-9.0:- : :'.'sg~;-~- - ' ~.~ ~o "~-~5' - ~a~'S. .... -S~;'9: . ..... ~..o.,-~---.-:.:--:~:,~-.-~:--.:--~._~ - --~.~ ..... .... ~-a'55. ...... -~-~0 ~-- -~-a, e :"-'-'~ ~-.:'.- '~ .... ~.-~ ' ~86s, - 6o.5 .~s'o~" ?.'..:.' -'. _~.o ........ ~-~s, .... ~-~-;~'~-"".'.~''o~. ~'.~ : ~-'~ . ..._ - -~5. s~.~---~- 5- :'~',...: '_'~ .".:~..:-~' S/.~-----'~.'~.:~.~.~;:~--..-'~_' .... --- ..... ' -~.~. .............. ~-8'~'S. ......... ~-0-; .: ~' '.'.. ...: ~ ' ~' ~ o;:..: ._ -~S ...... - ' ...... ..... ~'~'0~.' - ~-8-; ~ ~6.6 ~.0 ~.9 ........ ~9-iS~ .... 5'i;~ ~9-.~ ~.0 ~.~ ~.~ ' '' ..................................... R9~5. 58.0 ~8.7 ~.1 ~.~ ~.0 . .......... ~-~'S'; ....... -6-S-~ 7 ........ ~-i;~ ......... -~'~-'4 ........... ~'~ ........... ~-~-'-~ ............. ~9'~ 5' 71 . 5 57. ~ 5 . ~ ~ . l 2 . 5 ................. ......... -~'gS'S; ........ ~4.'~--- 6~.s ~.~ ~.~ ~.~ _ ~6.S? ....... ~ o_~.6 ....... 6~_~P ............. ~_~_~ .......... ~ ~_~ ....... Z...~ ................ . ~s. 7a~ .... 6~ . .~.~ ......... ~_..~ ..... ~.8 . ~985. 78.9 66.6 ~.~ ~.~ ~.8 ...... '. ....... ~-~-~'~;/~..-.- .... ~S-;~.-'--~-~;--~ ............ ~_~;'.~ ..... ~-~;_~-7~L- ~'~- ...... ~00~. 77.1 69.1 ~.~ ~.~ ~.9 ........... .... ~--~-~'5,--~'-?~-;~ ..... ."-_'~--;-s ....... ~;'-s~ ..... ~. · ~0~5. 67.~ 60.8 ~.8 ~.6 ~.0 - -~o~-S-, '- -79'.'-6- ~.8 ~.-~ - -' ~.~ ........ ~.~ . . .~o55, ~.o_ .8_~_-7. ~.o ~ ._~_.~ ~o~5. 75.0 72.2 ~.2 z.~ o.8 ...... ................................................................................................ ~o85. 7~.~ 7o.~ ~.5 q.o ~.4 ....... .................................................................................... ~095. 72.5 71.9 ~.~ 3.9 . _ ....................... ..... ~'z-zS,'- '7-4,'z .... t'8; ~- .... ~'. ~ 3.9 3125. 80,~ 80.0 3,2 ~.A .... ..... i~ZSS; ......... t-~-;-'g ..... 7Z,-S ........... '~';~ ........... ~;~ ........ S.~ ~145. 75,0 68.8 3.7 ~.1 . . PAGE SOHIO ALASKA PETROLEUM COMPANY O ._$~._.. B-2! 3165. 7~..9 69.1 -~.0 4.~ 3.5 ..... :_3185, ...... ag._a ......7~ ......... ~_~ ........... ~..,_2 ....... 8_._7 ...... 3195. 86.5 71.I ~.~ 5.7 ~.7 . .~205.,.. _7~..5 ..... 6_7~.9 .... *.,.6 ......5_.,_7_ _.,,8 . _ ~2z5., .... 66.5 _5~.7 . 5.,!. ..... ~.2_2.5, ..... ~ ,_3 _ __5a.~_5_ ........ ~.~_~ .......... ~__, ? ..... ~. ~ .. . -. _. ~Z~5. . 7~ aO.~ ...... ~_~ ........ ~.6 _ 3..0 ~2~5. ~8.~ 35.0 5.0 ~,5 3.~ ~55. . 6!,0 45_.1_ ~_,_9 _ 5_,~ ~.0 ........... ~2_6..~., ........ 5.? ~.~_ .... ~9__,__5 ..... S_~q ......... S_,O ........ ~_.S ........ ~275, 58,1 ~2.~ 5,6 5,6 ~.2 '. .... '_~~._ ~'_'_ ~ ....... ~_~_L'L_-'.~-~ ..... '_,,.,__-~__/ ........... ~ ~..~'~.~'.~.-~_' .~ ......... ~.~: .......... ,.,- ...... . _ ............... ~ ~-z-~-"; ........ 7~-, 7 ........... ~';-~- ............. ~-;-'~ ........... ~ ...... S-,-O .......... .........~'S-~S'; ........ ~-;2"'.': ..... ~-~ '--'6- .--- ':'---: ~.-,L~'-'-::L-:--7~:.:~- .-"-'--~;Z' ' ..... S'S-~. ' 7~. 'S'S,~': '.': s-~ .;:- .': -'7'-s'~ ~-' ~s.~ ........ · ~S'S~'. ...... 7~;-~. "-'-S'7:-~-~'~ ...... :.,'~'~..?. :.:..::~-~.*/.--5.~' - ' ' : ..... .... ~-~-Y~'-- .... 7-~; 5''''/''~. ..' ...... S~'~; ..... 7~.Z.. ~.::.: .._:..~.._ ' ..... :---' ... _:.. ................ S~-os;- ' 7~.~' ~o'.5 -'s-s. _ 7.2 s.~ - - ......... . .. .......... S~-Z-S. ........ ~-~-;-0-. ~7'_~ _s.z. _. ~_'.s ~- ~.~__ . _ ~25. 70.8 6~.1 5.5 7.8 6.2 B*~5, 6~.6 ~.6 5.7 6,7 ~.9 .......... ........ ~-~5-~-;---'.--~-i-_; ~-~ ....... ~-'5-/~._- ......... ~-;~-7-~_~-~.~---~-~' '~-~ ................ 3~65. 68.2 50.8 5.9 7.2 5.~ ....... ......... ~7~-;--' ~-i-~ ............. 5~-;7 ........ ~';-~- .......... f'~--7 ..... ~-,-~ ......... . --'~-: ............ ~-.-~5;:. :.--~--~:~; tT__'-:~.-_~S/;'o ....... ~-~_~'-~ ..... -_-_~;-:----_': :/'/~; ~ ~". ........... ....... ~.~ o_~_,. ...... sT.~ ~5.z s.8 Y.~ 5.~ 3515, 62.5 ~7.0 ~.8 6,0 ~.7 3525, 52,0 ~.9 5.5 ....... ~-~-~";--_ .... ~o,'~---~-~-~:-~ .......... ~-(0-_- ....... ~-;~-_~ .... ~_~-5 ......... . _~ ~5~5. ~9.2 ~6.7 5.0 ........ ~SS'5-. "- ~.0 ......... ~0--.-~ ............ S-;-~ ......... f'"i ........... ~",-'~ ........................ .................................. - ~565. 6~.~ ~7.~ 5.6 G.~ s.o ~s75; ..... 66;-9 ...... S~-~-~ ........ S';-7 .......... ........ ........ ~5-9-5, .... ~-9-,'S ....... St-;' b ........ g-.'O ......... a-;-'5- ........ 6,'~ ........ ~05. 5~.2 ~.~ 5.~ ~.7 5.1 ...... ~-~-~5'. ....... 5~,9 '- ~8.~ ..... ~,o ...... ?.~ ~.~ - ~aa5. '~. ~ .... ~-; ~ i-,'z -a';'z ' 6,o - ~5. 7a.o ~'g'. 8 ~.O .... a-.-? 'a.~ .......................................................... PAGE SOHTO ALASKA PETROLEUM COMPANY B,S. B-21 ' - GR;5 ANO"SP!-ARE- RUN-WITH DIFi, RUN DF__PTH GR3 SP1 RFCI RLM1 RLD1 " -FT. -- - AP1 ' --MV ~6s's. '6o.3 '-,+4.~s ' S's ' ~._~ 4.8 M665, 59,1 46.1 5.9 6.9 5.1 ~685, 56,0 50.~ 5,9 T,T 5,9 ~:~~ ...... ~;~-"_ ~4..e ~-;07_.~ Y'? ~'~.~ ~? ...... 37o5., .._ ~8~9_. 5~,.~ .... 5...~ ..... 7.~. ~7z5. . 66.~ . 6i.o .5.9 ~7~5, ..... 70.?7 .... 6_O_-S ...... ~0 ....... .~745. 75,0 68.5 5,5 7,8 ~_7.6.~_, ..... 8~_?? ...... 6.8~_~ ............. _~._,_0 ........ ~785. 87.2 G8.8 ~.5 795. ..... ~-~ "-i ...... ~_ ..[ ........... ~_ ,~ ...... ~805'. ~7~.'7 ' 64.9 5.5 7.~ 5.8 ~25. '--8i-. s':: ':~'7o .~ .... 5-; o ~-~-55; ..... s~;'~::..:'--~:?~-' -.:5: -~8~s; .... ~s;s.--::~f ~-~:.~ ~9o5;-' ~b-.9 _.~8.~ ~.3- ~-9 3-8 -' :5925. 52.8 40,0 ~,8 5,7 3945. 5S.Z 55.7 5.5 m.9 5.2 ~985, 75,6 65.Z 5,5 7,8 ~,2 ~005, 77.3 67.9 5,0 7.5 5.B ' ~-0'~5. 58.S ..... 5~.5 ..... 5,2-' -~,-S 5.o- .......... 40'S5; ...... ?i',-~ ...... ~--~, 7 ........... ~8_ ~-~ -5'~z- .......................... ~065. "67.5 .... ~0.~ 5.0 ~.7 ' 5,'-2 - ' ' ...... ~o95', ........ 5-9';0 ....... ~-~-5- ......... ~',-a- ......... ~;~ ............ ~';-~ ................ ~105, 63.5 69,0 ~.G 5.5 ~.5 .... ~-s; ........ -~-~,~- .... ~5';o ..... ~-_s,'~ .... ~-.~'s,'? ...... ~;'~ ............ ~125. 92.1 26.8 5.1 4.~ ...........41.~5.~ .................... ~.7.5'- ............. ~2..~: .... ~ ........ .5e3-; .................. _ 5._0; ......................... _ ~.7 . ~!45. 4~.5 41.7 ~.~ 5.0 ~.9 ................................................................ PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 'GR3 A'ND'sPi ARE-RUN WITH DIFL RUN NO. '-DEPTH-- GR~ ..........SP! ..... RFCi .... F~LM1 ..... RLD1 FT,, API MV 4165. 76.6 76,4 go~ 6.g 5.3 4185. 65.7 57.~ 5.3 G.7 5.1 ~lgD. 69.8 69°5 5.1 7.5 5.6 .~205., ...... 7.6_,~ _Y.O-! ..... 5,2 ..... 7.! ...... 5.7 4215. 76.1 7~.2 ~.5 ~.~ 5.~ ~225. 66.9 68.1 5.0 &.~ 5.2 ~'235, 73.7 71.1 ~.7 ~.~ 5.1 42~5. 63.6 58.9 ~.6 5.3 ~.1 ~255. 68°9 67.7 ~.5 ~.3 ~.8 ~265o 63.~ 57,6 q.8 6.0 ~.5 ~295. 5~.6 28.~ ~.~ 5.0 2.5 ~305'-~ -7i~9~ &'5.0 3.6 5.5 3.9 4~-g~5. ' 7'2. 8'. 'i .... -/5:~ 8':':>i !::...'i--:.::'.: ~5.::.O..: F.:' - " ' .3~. .... ~ i. a~.<::. ~:--?- .: .~572~2.7" ~q25. q~.7 63.3 6.5 9.8 6.7 ~65. 70.6 67.2 ~.7 6.~ 5.2 ~85. ,s.~ 37.~ 5.7 ~.~ ~.0 ~5o51 ..... ,~.l -'ei,~ ......~.s ~.~ 2.1 ~525. ~2.8 28.5 3.1 2.5 1.9 ..... ~-~--;--_--_---.~-~-,s-_- --~_~-:-~ ....... -~-~';-s---_-~- ~-~--;-~-~.- ...... ~_.-0 ..... . ...................... ~5~5. 71.3 71.7 ~.2 G.0 4.7 ........ g'55-5'i- ..... ~-.9 ....... ~-7-.~-- ~.'~ ......... -~--i ~ ........ ~--ia ........................ ,5~5. ~5.o ' 59-,6 --3-'6 ,.~ 3.~ - ........... ~ ......... . ................. /.~ ............... ~575, 70.6 o5.'~ ....... 3-'~ ...... ~.-~ ........... 3"S ......_ .......... ..... ~595~ '3'2',8 .......... if~5 .......... ~.~ ~ 8 1 ~ 4605. 56.6 28.8 3.9 2.1 1.7 ' - -~'615'.''- ~S~a .....~7-,0 ..... ~-,~ ........ ~,~ 'a.~ .... PAGE 5 SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 GRS-ANO'SPi-ARE RUN 'NITH'DiFL-RuN'-NO.'-I." DEPTH GR5 SP1 RFC1 RLM! RLD1 FT. API MY . . ~665, 28.~ 16.6- ~.0 ~.9 2.1 ~685.' -~.~ ~s.s ~.~ a.~ .a.i .................. ....... ~6~-; 67~-~ .... 7i:~ ...... SiS ............ ~-:: ~.~ ~705. 70.~ 65.7 3.6 ~.5 ~.~ ~725. 5~.2 ~0.6 s.2 2.s i.9 ........ ~755. 70,7 75.0 5.~ ~.I ~7~5. 61.5 51.5 3.5 3.2 2.6 ..... ............................................................................... g755. 76.2 72.5 ~.7 ~.7 5.8 ..................................... ~765. 81.9 72.9 B.8 ~.8 ' ' 4'7~5.- - 90-'-0 ----6~:"~ ...... ~7'9~, ........ ~';-~ 69.9 ~.~ 5.7 ~.~ ~805. 69.9 59.5 5.~ 6.6 5.7 ' ~-~-3~. .... ~b; ...... ~22--~;::-:-:;-- ~90-5, 67.g 56. ~ 3:. ~ s..i 225 - - ' ' ~925. ~.9 25.1 2.7 1.9 1.5 ~9~5, 88.5 7~.2 3.8 ~.9 3.7 "~965.--' 57.5'-- Sb;5-- :;'E-" 2.&' '2.z ..... ~ 9 75-. ...... s2; 0 ...... 2-5-;- ¢ ........... ~. 2 2.: ..... t-',-7- ..................... - _ _ _ : ~985; 5~.2 ~l.o ............ ~ 995 ~ ....... ~4-"~ 5 ........ ~-8-'-~ -0 ............ ~'-~'~- ........... ~-Y ......... ~, 9 .................. '~oo5. - -55.'9-" ~i'.o ~.~ 2.~ ................................................ 5.015. 56,0 _. 26.7 . 3_.7 2.~ 2.1 5025. ~1.6 30.0 3.6 2.2 1.9 ............. 50q5. ~8,8 5q.O 3.~ 2.A 2.1 .... 5055.- -' 6~,~ ....... 75--~-9 ........ 5085. 62,8 6~.2 3.5 ~.5 2.8 ..... So95. ..... 2g;8 ........ g7-,-~ ..... is. 5 - -- 46. i ..... i9.3 ....... R105. *0.5 77.8 10.2 18.0 9.7 5125. 80.5 86.7 5.5 3.~ 3.0 . . ...... ~!-~'~ .... 77~' ~i'5 ....... ~'~"2 ....... 5-'i'& .... S.2 ' ' ' 51q5. 79.6 8~.~ -2.8 '5.2 2.8 PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 ' -GR3 AND"sPI ARE-RU'N W-ITH QIFL'RUi'~--N(~'-I, ' .' '. "DE_PTH-._" _ .... GR3_ "i_'i--sPi--_'_._R_FC$_ FT, ......... AP I ..... Mv g~SS.' .82.~ 83.5 '- 2.7__' L-_'3.2- '2.8 5165. 6i.8 79.0 5.2 . _3.,_5 ....... 2_,9 ........ . . S~75..__ 5.7_~.~ . _~!_.,7 ..... ~,~ .... ~.1 ..... 2.8 5185. 58.8 6~.0 __ .~..,~_ .......... ...... 5205_, ..... _~_6 ~ 8 ...... 6.2- O_ .......... 3,_9 .......... 5225. 58.5 65.3 2.8 . . ~2~5. 8~. 9 87.0 _¢_,7 .......... ~.~. ........ 2._7 ......... . .~255t. 79¢_2_` 86,1 .... 2.6.__ ~,t .._2.6. ~265. 59.7 61.9 2.5 2.2 1.9 _. ..... 5285. ...... _7__ff..-_2 ........ a.S._5_ __ 5a~_5. _~5-2 .... 5_.5.6 ....... 3.8 .... 3,_0 ..... a_.3. . ~05. 7~,7 86.5 2.7 3..~ 2.8 5515. 58,2 ~2.9 2,8 2,5 2.1 ~365. 9.1-_~ 39. ~. --2-7 '..: "5~25. 36.2 28.8 8.3 3.8 2.6 ..... 5~55. 77.0 Y5.1 5.0 ~.1 2.5 5~65. ~0.1 82.2 2.6 2 ~ 2 5 . ._ ....... ~-e'5-; ...... 50-. ~ .... 27-';'~ ........... 2';-8 .......... z",W- ....... i; 2 ........... 550'5. - 6~.8 ....~3.~ ....2.7 ...... ........ 551'5 ~ .... 52.9 ~7.7 2.8 1 . '5525, 5~',7 ~0.7 2.9. 2,-5 2.0 ......... .... 5535; .... 63',-~ ..... 6-~". 0 ~545, 68.~' - 80,5 . 55'55,' ' ' 76;8 ..... ~-*-~ .......~;-~ ........... 5,'-~ ....... ~-*-e ......... - 5565. '82.o "'Sz.e .... 2-¢ ...... ~;-~- 2.9 ' ....... ' 5595-. ...... 37.1 ....... 9.-8 ' -2';-6 ...... Z-;~ ...... 0-;'8 ' ' ' . ' ~625. '29.~ .... ZO.6 ..... ..... ~ . 56~5. 31.0 7.8 2.5 1.1 0.9 -. ............. ......... PAGE 7 SOHIO ALASKA PETROLEUM COMPANY D,S. B-21 GR$ AND SP1 ARE RUN WITH DIFL RUN NO, 1, FT. AP1 MV _ _ : - ~ ~ ........ :-i: F-T ~- .......... ~ .................. _ . ~655. -'39'1-'-Z5.7-'- .~665. ~2.~ 11~.5 5,~ 1.~ 1.1 ' ~67~-, '- -4'~',-0 ....... 5685. 59,5 58.1 5.5 ~, 1 2,5 '.' '. ". ~6~5,' ' _--~7;-~:'--_':-~-;~-~_ ._ '-':~;G .... ~ :-_~.:~-;-~--~--:--2;Z- ' _ .................. ~ ........ 5705. 54,6 28.6 ~.~ 1.9 1.~ ........................................ ' "~7~5, .... _- ~;'~.~ .... P~;'7_ _ .~. o .... ~_.~ .... ~._~ 5725. ~0.~ 15.7 3.0 1.2 1.0 R755. 58.9 7.7 3.2 %._~ ~ . _0., 9 _ . ......... s755,_ ~.~..s~.~ .... ~_.~ ~.~ Z_.~ 57~5, 55,2 45,2 3,2 2,2 ~,7 ..... ~Fz-Y~;~-_-'L-~_;--0_-'~"':~-~;~ .... ~'-;~-. .... ;-~..;z-'; ...... ~-.-o ................... -_.' '- ~_7.~-s-; ...... ~';--~ ...... ~_._~.._ ~...~ .... D..Y._. ~'; 0 ............... .......... ~-B~S; ...... ~9-,-~ ........ ~'~';~ ............ ~;-6 .............. ~;-~ ..... 2-,-~ ~ ...... ~ ....... __.. ~. ...... ~ - . :_825. D2,8.. ~'2.! ~,~ z,5 1.9 ' s8~5, ....... ~2';-~'.~'-- :"-':.----3;7-~--:-~ -2;4-. .... -'2.0 .......... - ~'~'5', 7z,O: ~ - ~86'5, - 7~,5' 8..~ ..2,:~..:':'. :..:' >';..~.--.. - 0 ......... ~8-7s; -'- s~;'5_'-:-' 7-6"- _'-~.~.'. __-.'z..2_'_. .~' ........ r;o._ i..__' . .... - .......... . ' - 5~8~,- ~g;8-'--'---:----~:-~".B-:..--:'-.- _.'..,_ :o _~_ -'":-- . ......... -':: ... ......... SS-~-S; ....... ~-'; O,9 ' ......... -- ..... "S~O5;- -67,-~ 56,~' 2-.~ 2.~ _2,0'- "' ........ fgi5" ........ 5-~";Y - 66.'~ .' 5.8 .._'Q,O_ 5,~-- . " ........ ~" ...... -42;-0 ..... i~'--Z ........... ~';'~ ......... f;'-~ ....... i;~ ............. ......... S955; ....... ~-~-'-5 ...... ?~ ;-S- ........... -~;'-~ .............. 4-2~ ....... ~-;Z ..................... 5965, 79.2 76.5 ~.2 ~.0 ~.l ..........597b,~ ........... 77_,_~' .... 9 ..... 997- ...................... 0 _. 2,8: ...... .......... 5. z; .... ;~ ........................ _ 2,6 . 5985. 80,2 69.5 5.1 5.2 2.6 &O05. 95.6 65.5 2.9 5.1 2,_~ .......... ~015. 87,5 &025. 92.3 70,0 3.1 ~.I 3.5 ................ &O~5. 63.0 1~.5 3.9 1.8 1.3 ........ .... ~OS5-. ...... S~ ~ s S-,-5 ........... ~, ~ ...... i; 5- ......... f,'~ ...... . &065. 75,6 69.8 2.8 3.1 2.~ .... ~o75,- ' ~';9 ...... '~S-:5 ............ S'.~ ......... '2-.-~ ........... a-la ...................... .'_-".... -.' ~o~S-,/.-' .... 7-.~0.- .... ~-5-_; 0 ...... __~_.~ .. ~.~ ~.s ............... 6105, 82,9 74.8 3.2 g.5 5.6 ....... Gl~5, .... 5-g;o ...... ~';-~ ......... ~-.-~- ..... S;'-O .... ~,-3 ........ ' ~z~5. 58.5 ' - '59; ~ ~';3 -- - 3, ~' 2.5 ......... . ..... ~'z~s; ...... -~-.~ .... _-.-_~-2;~-~ ..... ~-;~ ...... ~';~ ........ ~-,a ................. A~5, 39,7 26,8 ~,0 2,~ 2,0 PAGE 8 SOHIO ALASKA PETROLEUM COMPANY D,S. B-21 AND SP1 ARE RUN WITH DIFL RUN NO. ~L, FT · API fqV _6i5~... 3.3 _ ~0.9 .... ~_.__-e.. _!.._5 .... ~_ 165, ~7.& 15.q ~.1 1.7 1.2 ~185. 60.5 57.9 2.9 2,~ 1.8 A205, 76,5 71.9 2.6 3,0 2.~ ....... ~2.Z5' __. ~.8_~_~ _ __66.~_5 ....... 2.~ ....... 2.~. _. 2.~ ...... . &255. 63,0_ ·_78-1 2.7 ....... 3.~ _2.9 _ &2~5. 69.5 7%.1 2.8 3.& 5.0 6265. 79,7 78.5 5.1 %.i ~.~ . ~295, 87,~ 7~.2 3.~ q.7 3.8 ~305, 96,9 76.~ ~.3 ~.5 3.5 . .................. asa-:-;' ........ ..... :':: ::---:' :S; S.'8 ...... ' ' -- ~05, 58. $ 5~-;~ ~ ~ - s,~: 2-,5: _ ' ' ....... ~4i5, - 7:;6 56..5---. ~ _ : __~.:~: _ ' ' . '-&~25. '-77.~ ' '-48.9 ~.3 3.5 2.6 ..... a ~'a~, ......... 7 ~' ;-e ...... 5-8;'5 ............. ~- ,-~ .......... '.~ ;--i ............ -~ ;2 6~"65', 68.5 70.0 5.5 q .2 3.2 6~85. 59.9 ~2.8 ~.7 5.8 2.2 · 6525, 52,8 '~8.2 - - ~'-;3 ..... 2-,-5 .... i.8 65q5. '"&5.2 '--~3;~ .... 3;6 ..... 2;&- '2.1- &565, 60,~ ~.~ 5.~ 2.7 2,2 ................... ...... ~57'5 .' ....... 7i. 0 .... ~J;-2 ....... 2.7 ~. 5 2.7 i625, --8m. 5-' 88.~ ' -2-,7 --- S,S ..... 2,8- &6~5. '79,2 .... 9~.5-- 2',2 -' 2,5' 2.1 ............. PAGE 9 SOHIO ALASKA PETROLEUM COMPANY D,S. B-21 GR$ AND SP! ARE RUN WITH DIFL RUN NO. '_ DEPTH. ': -' .-G'R_~-.. _-i.$R!i-:.i'_~Fci! i'.'_~L_Mi ' .RLDi FT, AP1 HV ..... ~ -. ~ ...... ~--~. ~- _ ~ ..... .. G675., 7~_,5 _gq-..~... 2,8 ~.,_3_ . .2,7 g685. 74.7 96.1 ' · . ~-~-5; .... ~o;-o-__---~.-p-:--- ~-;:~ .... _--~L~ _:" '2,-~ ...... ~705. 87,7 9~.5 2.8 3.~ 2.7 ~?15, 35,5 96.2 2.~ 2.4 2.1 ~7~.5.. .... 87_~6 .97._~_ .~2,2 ..... 2.~.__ 2.2 A7~5. 7~.9 9?.5 3.0 M.I 2.7 ...... ~755', ..... ~,2 ' -'~';-S .... ~-;Z ..... ~.~ ....3.~ A765. 76,3 99.~ 2.1 2.5 2.0 ' A8'o-5. - - ~'.8-9~. ~ ~.~ .......... 2~'i5; ~7.6 9z';-6- ......... 3-;~ ........... -57~ ......... ~','O ...............~8~5, '~ ~, ~-' --'~< :1-" ........ ~3.,;:. ~: -- ~..:- ::: -'-:_~--".TF:~.,_0_.; ........ D,5-~ -'-' ....... -- -'--:~.~ ............. ..... ~855, ........ 8~;-&;..~- .... e;~,~'; .... :~.~.':5:.".;~.:;- -'~: '..3-~ .......... - ~8~5.- - ~,~ 9'7..; 6..<;- <.:;-~S...,~- -'......~ - ~ -" ........ ~-87-5, ....... a~;~:'"".'''. ;'~<.~: :__ ' ~8a5; ' "~ ;'o"~--~--: '.'~..' ................ -~-5; ....... ~&-;-i.. · :/'"--~- ...... .. ................ --'i '- ~ .... m~5';'..~-_'---~;i_ _ _~.~ ....... ~_.~_ ..... ~,_~_: .... ~-,_~ ........ ~925. 82,9 96.5 2.9 ~.5 2.8 '--. -' _-' m~.,--'_-'-~__~;-~--i~'~-~'~? ........ ;-_~-o-i-;.-;~-~-;-~- ....... ;~;;~ ....... _ ................... &9~5, 9~,3 95.2 ~.1 ~.~ 2.9 .................... ~ ...... i ..................................................................................................................... &955. 95,2 95.5 3.3 ~.2 ~.g ].' - ' ' z~Y-5-.-.---/_-~'?;~-i Tg-~-;?-_- ......... '~-;~i ...... i_~s-~- ..... _-~i]~-;"-_"_ ....................... ~985. 95.6 98.0 2.5 2.8 2.~ ............ ~-99-5-; ....... -9-6';-i .......... 9-~;~ ........... ~-;-~- .......... ~';~ ............. 2 ;~ ............................ Company Well LIBRA3.Y TAPE CURVE SPECIFICATIONS SOHIO ALASKA PETROLEUM COMPANY B-21 Field PRUDHOE BAY County, State N. SLOPE, AJ~AS~ Date 12-11-82 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale RFC1 [Resistivity Focused [ DIFL RUN I .2 - 2000 RLM1 " Medium " " , RLD1 I " Deep " " SP1 I Spontaneous Potential 1 I " 0- 150 GR3 Gamma Ray 3 " 0-1013, 100-200 '.~ RFOC Res±st±v±ty Focused DIFL RUN 2 .2 - 2000 RILM " Medium " " , , RiLD " Deep " " GR1 Gamma Ray 1 " 0-100, 100-200 SP Spontaneous Potential " 0 - 100 AC Acoustic BHC/AC 150 - 50 ,, GR2 Gamma Ray 2 " 0-100, 100-200 SP2 Spontaneous Potential 2 " 0 - 100 DEN Density CDL 2 - 3 CORR Correction " -.5 - .5 -- ,, CN Compensated Neutron CD/CN 60 - 0 , DENP Density Porosity " " , GR I Gamma Ray CDL-CD/CN 0-100, 100-200 __ LIBRARY TAPE CURVE SPECIFICATIONS Company SOHIO ALASKA PETROLEUM COMPANY Well B-21 Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 12-11-82 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale CAL Caliper CDL-CD/CN 6 - 16 , I ,, , , ., ,,,. , . ., .. . . ,. , . .-- , . SOHIO ALASKA PETROLEUM COMPANY D.S, 8-21 25 CURVES : R'FoC R'ILM 'RI'LD C-FOC"cILM-CILD sP'-' GR-' RFC1 RLM1 RED1 DEN CORR GR3 CAL DENP CFCl CLM1 cLD1 ,~P! r~Ri--. . 'FROM 6950,0-0 TO-Z0220~-00 ....... LEVEL SPACIN$ 0,2500 62.-~APiPLE~ PER--~ECORD ............ PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 9372, 117' i0'3,: 2;'0 i;g' i," 99' 96' 81. 96. 11, 2.5 9382, ~9' lOl, i;9 1,5 i,~':~-07' ~22. 89. 122. lZ. 2.5 0.2 ~9.3 12.5 · 0..3 .~2.1 2~..1 ~ 0.3 .~1.2 17.2 'GRI '.IS RUN_.. WI.TH-O'ZFLffi ;'G_'.R_2. &.$_p2'-i A.R-~..i~UN '.wi.TH BH.C/AC. . DEPTH _ GRZ .... _SP __RFOC R~L}~_. R!LD AC GR2 SP2 GR CAL DEN CORR CN FT,_ Ap! . My ............................... API MV .AP1 IN G/C . ~... ~.. . '~l-sT. _ d. ..... O, 'o;o'- 0,-o' ...... 0.0-- ' o; o. o. o. o. o.o O.o °.o~8,5~ 91~2. O. O. 0.0 ._ 0~ ..... 0..~.0 .....O, . .0... O. 0...0. 0,0. 0,0 .0,.0158...5__. 9z'~7; ...... o. ..... 6. o.o o.o o.o ~6. 6~.-25o. 6~. 9. z.7-z.~ z2.6 ~9.5. 9i5e. O' '--o; .... 0;'6" -~;'6' ....... 0;'0'- -SZ.-_ 63._-e5o,_.. 6~.. 9,_ ~.6 -Z..3_.~6..Z_ 9i~.7'_': ~:'6-;'_-_"--b', .... 0.0 /'0:.'-~- .'~,.~__ 75~ 65.-250. 65. 9, 1.5 -~.2 ~7.7 70,7 9162. O. O. 0,0 P_~__O ........ P~O .... 77- .... 6~5...,25.0. _ .65. 9. Z.6 -Z..m ..... 9i~7', ...... 0-' ..... '0-*--- -~,0 0.0 0.0 56. 6~.-250, 63, 9, 1,~ 9i7e. - O. -0';' '-07o 'o,'0 -'-6;-0-- 56; -6~.-e5o. ~. 9. z.7 -z.~ ~.~ ~o.a ........................................................................................................... - 9177, O, O. 0,0 0.0 O.O ~5. 69.-250, 69, 9, 1,8 -1,3 x2,9 ~.9 9-z~'a;--' 0;-" O; .... 0~-0 -'-o;o ...... 0~0 89, s7,-25o. 67. ~. z.7 -z..3. 9192. O, O. 0.0 0.0 O.O 55. 6~. -~7. 6~, 9. 1,7 ,1,..~ ......... Pe_P_~_~ ...... ?_,_~ ........ 0_~ ........... p..t_o ......... ~,_0 ....... O~P_ _~6~. ..... 62, r~_9.. 6e, ._ ~..z...a 9207, O, O. 0.0 0.0 0,0 7~, 70. -52, ~0, 9, ~,6 92~2, O, O, 0,0 0,0 0.0 62, 75. -5~. 75, 9, ~,_7. r.!,.3~ 92~e; ..... 0-' ]~.: 0. ...:: ::a'o': -: ~_0.,-:0'~:.'~.:' :.~.:. 7~.~:~0.' '7~. 9. z.~ .~.2' ~2.~ ....... ~'~-7-, ' 0-, ..... :~--0- :.' ..'..T7:':..': ~-'- :~S? -5z.~_~.~:.~.' ~. z.7 -z.~' .... ~2~2. '-' o. -- :"':: ~:-::~'sz'i~'; ~0. -'~:'~. z. ~ - z. 5 zo. ~ 70. ~ ' -7o, 70. z'.8' 9272. O. O. 0.0 0.0 O.O ~5. 67. -53. 67. ~. ~,7 -~?.~. ~,6 .~. ...... 9277, ..... O; ........... 0'; ............ d';--O- ......... d-;-O- .....d-;-b- -5-8; .......58" "'17'." 58. 9. 1.4 -2.4 x6.5 78.3 9282-; .... ~.- --0. -'b-;b- 0;0- 0;o -5~.' ~7. -~4. 67. 9. z.9 - ....... 9287, ......... 0-; ....... 0-; .... O-;-~ ....... 0;'-0 .....~--0 .... ~-0, .... 7-4,' - ;~-. 'Y~. 9. 1.7 9292. 0.' O. 0.0 "0.0 ...... 0.0-~OB; 75. -4~. 75. 9. 1.7 -1.~ ~0.8 ........ 9297; ........ O, ..... 0-; ......0'~ .......0--'-~ ....... 0-;0-- ~9; ..... ~0, -~5. 'YO. 9. 1.8 -1.~ ~3.~ q~2' O; ' O. .... O'.O ' 0-,0 --0;0--85.'- 6Z.-50. 6Z. 9. 1.4-1.~ ~4.9 75.6 ........ :9-~o-7; ..... ~0-;-;~-~; ......... o;'01--' o';p_~ ..... O-~_O---T09; '~2.--,~-~-, - ~2. '9. i.5 9517-; -- -6'~ ;- -' ; i~; ....... 0;0 ..... 0,-~ ...... 0-;6 ...... 92;' '~9,""i2. ~9.' 9. 1.4-2.2 '~2.5"-77"~- 9322. 5~; -1'7.'-' 0.0 - 0;0' 0.0 9~-. 57. -3Z, 57. 9. 1.5-Z.5 z~.O 71.8 9532. 6~. --~, 0'0-- 0;'0' 0.0 89. ~9. -~8. 69. 9. 1.6 -~.3 ~.2 g7.0 ................ - ~'337','- 57, ';~-; ...... O-;'d ............ 0-;~ ........ O-;-d-'2-~'-'~1.--38,- 61, 9. 1,~ -Z,~ Z2,7 85.7 9~.- 6Z. -ZO. '0,20000;0 ..... ~-,~ 526. 59. -~5, 59. 9, 1,~ -Z,5 ~5.2 77.6 9'~7', 5~. --,'7, ...... 0'-~0000,~ ..... ~--1 -23; '-59.' .29, 59, '9. ~,3 -1,6 Zq.6 82.6 9-552, 65, '-~, -'-0".20000.0 2'.1- qB. 60. -11, 60. 9, 1,5 .... 9~57', ~0,-'-2'o, ......d;2OOdO;'ddd6'O,o {o0.' '-~3.' 27." 63. zo. 2.z 9~g2. iO-i. ZO0~ 1.~ ...... 1.M----Z,~ .... 7~, 90. 92. 90. 15, 2.1 PAGE 2 SOHIO-ALASKA PETROLEUM COMPANY . GRI' IS RUN WITH DiF'LD1,GR2 & SP2-A~RE.._RUN.'.WITH.BHC/AC._.'. .... D£PTH .... GR1 ' Sp'-RFO'c---Ri-L-.~- RILD AC _GR2 SP2 .GR CAL DEN CoRR" CN_ DENP-'. - FT. .... API - MV..-_' .... . _-.i-. .... i.-.-[-_ii-. '.- . .....API MV API IN G/C .... ~ ...... . . . _ ' 93'87.-131. 98, ..... 2.6- 'D~O' '-1.8 q'O~' 130. 63. ~30. ZO. 2.5 O.3 ~2~i ' ~ '9597',-2i3. .....B-~ ..... ~.~ ~0.3 v.~ 35. ~55. ~9. ~55. 9. 2.6 0.0 ~0,5 6.7_ - -~-4d2-;~ ~56,-~ -53: ~0.'2-'- ~-B~:g '~'2:7 -'~7~_ ~_8'5.. __. s?. as,. S.. 2..~ o,o !2..! ...... 9-4'07'~ .... ~-~'~'--'4i. 17.2 ~8.~ 13.~ a~. 59. ~. .59. 9. 2.~ 0.0 X~.i_ 19.9 ~ 9~17. 392. 61, ~1,7 11~.7 ~1.1 67. 118. 5. 1_18. 9. 2.7 0.1 3,9 2.~ .... ~-~i-.--'~'~-'~ ~e-, ...... -~--~w--i~-2i-~g:",'--~4. .... ~i~': ~ :' '~i,.' ~ .' ' ~. ~o.~ ~o.~ .... ~,3'~.~ 'ii5.'~ -70~~'~i~.8'- -~'j~ -ih-:~ ~'~i~'~. ~7. ~. 9. ~.~. o.~...!,~5 .... ~.._~.. ............................. ~ ........... .................. -9-~-g?; ...... 3~6-~ .... 3~-~' ...... --$~'i-~- ...... ~i-:~- ...... 3~ ..... 99'~- ....... ~0'-.~ "~,- 30. '~. ~.~ o.~ ~,.7 ' -~7~'.- 2i; ~U3 .... ~--~.0 ~9o:' ~,. ~.. A~. 9. 2.3 o.~ ~'~.~ ...... 9477 ,' '55-, ....... ~:g-;---.'...~'~//~7--:'~;;-~:F'.:F.~-~lf;'$-.---:-'879','~ "*7-, :' l~'. '-~7. -9.' 2.,0'.1 ';,"-4 -{9:7-'~ ............. 9~-87. .... 32;--26';--/32'-3:-- ~ ~.95. 49. ~. ~9' 9. 2.3 o.0 i-8.9 - 9~92;- 2~. -.2e. 2~5 :.~:52..'0g93. 2~. ~. 25. 9. 2.3 o.z ~'6.2 .................. ~-s'o-~; ...... -2-~', ..... -"':-2W--'-._ ~...-" 2'~; ...... ~'-; ' 2.~o.'z ;8.7 -95z2.-3'4W-:3~. 5~,9 55.3 ~_-0 9zl ~5. z'3' ~5. 9. 2.~ o.z ;6.2 '-' 9522.--23;-'- 22; 2B-.9-'~2-~ 37~'2 95. 3~. O. 3~. 9. 2.3 0.,0 .!7..3..2.5.0 . ............... 952?-; ..... 2-~; ..... i~, ....... 3-0';--5'-'g9--~-0- ...... -~S~--2-'---~-3, ..... 2i-: '~' 2i,' 9. 2.3 0.1 ~.8.~ 22.2 -' 9532. 2-0. i8. .... 3~;-~' g'A.9' '-4-3.3 - B-9. 27. -~. 27. 9,. 2.3. 0.. 0 . !.G_. 7 _.22. 7_ ......... ~53'?; ....... ~-;- ....... 2~-, ........ ~9;-~----~'.'-~ ........ Sg',~- .... 8-7;' .... 38', '0. 3a. '9. 2.3 0.0 ~7.2 2z.z 9'5'42.-'- 322- i8'-. ~4.5 46.9 50.~ 89.. 3.2, :.,z,. 32. 9. 2.3 o,z ~7.0 ' '-954-7', ..... -2-~; ...... i~-;----352'2 ...... 3~-':~ .... -~i;-~- ..... ~9, 2~. ~. 2~. 9. 2.3 0.0 !G.3 ~.~ - '~55'2. -'30.'-- 23,' 3V;i '-~'5;-G .... ~2-:G -~9, ~9. 8.. 39...9..2~3 o.0.. ~G,_9._~Z.6.. ...... ~5~-~, .... 4-9; ....... 3-~; ..... -22-.'7 ....... 3-6',-~ ..... -~;-A ...... -85, ...... 3'5-, eT.' 3-5. ~. 2.3 o.~ ~G.8 ~z.5 9572. 27. 2G. ~9.o ~s.5 ~.G 9z. 2~. -o. 2~. ~, 2.3 _o.~..!9._B.75.~._ ........... 9-577~- "2-0; ..... zG; ..... ~6-;-Z ...... 3~:'d- --g'2-:Q .... 9_~;'"_'2~, -'.~. '2~. 9. 2.3 o.0 ~7.z ' '95'82. ~0'--23;-' 36-2~ 3~.~ 3~.~-' 92. 35. o. 55. 9. .2..3 .o.z !5,5.22.7._ ..... 9587-'--'27; .... 2~-, ..... 26,4- ....~9'~-~----~2-~- ..... ~-~'~-"27, ~2.' 27.' 9. 2.3 0.0 ~7.5 24..5. ' 959"2.' 29,-' 2~ -~-~.3 "-2g.-A --~9~-2 9~.' ~0. 5. 40. 9. 2._3 0.,~ !a.3. .... ~5-~V.--2'~',- .... '25;- ....... ~z-;5 ..... ~;'A- ...... gV-,-~ ..... ~'~; ..... 25', '.0'. '25'. 9. 2.3 0.~ ~7.7 ~ ~ I . ~.- ........... - ' ' ~607.--e-e-,- 24-,- ...... 2-92--z ...... -~5-~'~ ....... 3'A'2i .... 9'~-~ ..... 26',-"2' 26. 9. e.3 o.o ~a.z .................... - 9612, -fl. 56. 14.1 10.3 11.6 85. 110. 38. 110. 9. . . ...... 9E. i7. .... 2-2-. - :30. "i5-~'5 ....29,9 .....~_"9-*-~ .... 9-q.'. ~0. '" ~. 20. 9. - '9622' 2'~. .... 27,' '1i-;2 2~.~'- 2-7.3-' 86. 2~. ~. 2~. 9. . . ...... ~62'7; -'-68-; ..... 36.- .... 2i;-~ ....i9"-:-g .... Z9,'2 ....~-1-~-- 27. 3. 27. ' '96~2.' '2z~ '-z5.-'-25~' 3z.9-' 31.a 9z. z9. -zs. zg. ................................................. 2.5 0.1 ~?.9 15.0 2,2 0.1 ~7.6 27.9 2.5 -o.~ ~]7..o. ~5.0 2.3 o.1 1~.2 22.~ 2,5 0,0 ~8,5 PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B r_a;i ' 'GRi iS"'RUN-WITH-OiFL-N-i~-GR~-& SP2 -X"~'~-RDN WITH BHC/Ac. ' ' ..FT' ...ApI_ ,-~V ........................................... API_ MV AP1 . IN G/C . _ ~ .... ~ 9G~a. Do. ~. ao.~ ..... ~_~.__D_. 2D_~_o_._9~....~.l. _,o... .~l, 9.. a.~. o.1 _' ' ' ~'~:::-~S:i'_:''i9..~ __~-9 ~-P'~ _:~?_G. ~7. ~. -~. aa. 9. a.s o.1 ~G.o 9652. ~7. 2~. 27.5 41.a 367~___~77.~..27.. _ 2. 27.. 9, 2,.~ 0,1 .~0..6. 9662. 23. 27. 78.2 89.7 55.~ ~6. 22. 8. 22. 9. 2.~ 0..0 _.8~6. : ~ :' - ~Z ;:' _-: :_~;"~:-~.;:'-::~,~.;~-"':~'~_:~_'TS~i":-;'Z~Z,". ~S' _z. ~S, ~" 2.5o.o ;o.z 9GY~. ~7. 2s. s..B Gs.s .~.. YTe. ss. ~. ss. ~. ~.,%.0 ~.~ ...... :~'~';-.-~':'~o;--_;: ~_~;:"-:"~_l;~:'-:-..:i~:~-:.::'~-O-::~'-~; ..... ~i';l~' ~z. 9. ~.s o.o 7.0 ~.9 9682. 25. 21. g9.6 92.5 575.2 85. 25. ~. 25. 9. 2,5 0.1 6,g 1~.5_ - :'-~9~87; ~'2~--;~'~2-5;-~:37;'~-:'''~'~0';'';3,3 ~0~' '~. ii. 2~. 9. 2.~ o.1 5.7 9692. 22. 51. 2.7 0.9 0.6 120. 2g. i7. 2~. 9. 2.g .0.0 8.5 17.8 ~ .......... ~-Y~; ..... ;~';': .... 2~4-;~-:'~',-~;Y .... ~;;~4-?i~g;Y;7"~'OS;: '-25; ~' '~. 25. 9. a.5 o.x ~.~ 9702. 2g. 25. 72.8 51.7 27.9 ~_76, .... 2~., . 6, 2~. .9. 2.~ 0.1 _7.6 17.,_ 9712. 18. 2~. 58.5 1,O.P 65.6 79. 19. ~. 19. 9. 2.~ O.i ~7~2;" 19;-: 2:~;t."51';i~ gS;f .... 5~;~ ~8; ~o,: -~' 20. ~. 2.~ o.i ~.l 1.7.5 ...... ; 97'77;- .... 2-&;:-:'--:-2:5; .... -::i:~.9: 15.~ : :1~.9 :-~:7;: ....... 2'5;-"20-'' '25' ' 9' 2',3' ....... ~7~Y;:.c~.;:..~::~.:2~.~.::..:i.~:;::~::.::.~:~;:~..::::::..~-;A.:::::~;:.-:.~s:-, ;'3~,' 23','-9, 2,3' 0'o '~-5',~ ~S02:; .... i~' --:~'~, - -9~;'~- '~;z ....... ~'2~-'~9; "2i' :-1~' 21. 9. 2.3 0.0 ~7;2- ...... 9:~'07;:: ::'--2'~-:;-:" :-2~;-;:::'i~2:;:s'7: :~';':-5::::;-i'2:;~-:':: ~-9'; .... -~'~; ..... ;a','--2~' ' 9,- '2' S''0' 0 ~:S',: '-~'~,'5'- .... 9'8~2;-20; Ri';' 9;Y - a;-~--' -~;~ ~'5; 20'; ,il. 20. 9" ~.2 o.~ J7.~ 27.1 ........... ~:~::7-; ..... ::2~;:-:-? 32-;':-;~-::l~;:s';:'::i:l:;:~:--Tib-;'~'' :::-bg;-::-'25;' -;~; .... 2~, ' '9' ~"S ' O, ~ :~;-~- 9~22' 7's, ~s, .....s;~- '~:~'- g;9 "VO. ~0" ~. ~0' 9. 2.6 o.o ~-~,~ ~.0 ...... 9'~2~';:- '90;:-: ~'-;' ::-" :~:;:~::":: ':"9;i-:;:':- -'; '7-,::--::-7a:;: ':: 92;' '~0',' 9a' 9, ~,7' '0.~-:~'-;0- 9~:s2; ~s;- ~; .... :~.~-ii';: ....... ~;~' 70;' 75; 25' 75. 9. 2.~ o.~ ~0.9 7.~ ' '9~2, -23,' '17; ~7;0 --~2;2- ........ ~79 ..... 9~; 2s. -2v. 2s. 9. 2.2 o.z ~9.~ . : :_ : _ _ _:_: ....... ::: : _:.: ..... : ...... : _ 9~2. 20. l~. 2z.s i2.7 9.~ 9~. 20. -52. 20. 9. 2.2 0.0 ~'~,6 ~9,'~- ' 9~'~'~: 3f;'- 20; --~-;~ g.b ~:~--~ ~7,- 30' ;2~' 30. 9. 2.3 0.0 ~9.3 23.2 .... : "' 9867' .... i-6;-'22';:--:1:i;:0----~:;-~'::::':--5;;'~:'--::9-2:,' i9', ;2i' "19' 9' 2.2 0.0 ~7.8 d .: .......... : ...... i C ..... ; _ 32 :. : : _ : - '. ~ - 9872, 78. 55, 6,8 8.1 6.~ 78, 71. 16, 71. 9. 2,5 0.1 15.2 13.7 g~S2' '19~ 'lS~,~i;3-' ~'A' ~-~ 9~. 20. -2~. 20. 9. ~.2 0.0 :7.5 SO.O ................... :::= ................... : ................ PAGE 4 SOHIO~ALASKA PETROLEUM COMPANY D,S. B-21 'GR!-is-RUN-bJI'TH"O-IF'L~-i,GR2 & SPe ARE RUN WITH BHC/AC. .... DE'P'TH .... -6RI .....SP- -~,-F-OC -'-Ri-EM- ..... Ri'ED .... Ac "GR2, SP2 GR CAL FT, API MV API MV API IN DEN 60RR 6N DENP . G/C °' 988?°'- 27." 20. --6.4- 3.0_~ 2,.& 89, 28. ,'~9. 28. 9897. 22. 20. 5,2 2.3 1.9 93. 23. -18. 23. 9902. 9~. 71. 5,5 ~.R 5.2 81. 117.38. ~17. 9. -~'0"~', .... ~-3. ....... 2-9. .... ~;--~ ...... ~;~g ....... ~';2 ..... 80-,-' 37, ' 7, ~7, 9912. 2~. 22. ~.2 2.2 Z.9 88. 2~. -~. 2~. 99f7-, ....21'. .... 20. ......~-'8 .... 2;'Z .....Z~-8'-' 90"' '2'0. ~11-. 20. 9922. 2~, 18. ~.~ 2.1 1.8 90, 20. -17. 20. 99~2. 2~. 25. ~.6 2.~ 2.~ 88. 22. -t2. 22. ...... 99~f.' '30. ..... 38, ' '6.-6-'4.3 .... ~.-9'~8, '~6. - 8. ~6. 9. _ 9, 2.3 0.0 ~.~7.1 25.2 9.. 2.3 0,1 ..S. 8.9 26.1.. 2.3 0.! !7~.9 23.q._ 2,6 0,2 13,2 2,L~ 0,1 13,8 19,0 . 2.3 o.z ~.8.0 25.8. 2,2 0,1 ~.8.6 27.1 2,2 0.0 ~0.0 2,2 0,1 ~.1 27.0 2.~ 0,0 ~.2 26.0. 2.~ 0.0 ~.0 18.0 . 2.~ 0.1 13.~ 18.5 · 9-952, ..... 17.-' '17. 4.5 1.8 1.5 92. 19. -17. i9. 9. 2.2 0.0 ,7.8 2e.i - '~957, .... i8; ....-2-1-. ........ ~';~- ..... 2-;-~ .......... i;¥ ---~92-.-'-i8, -',1'~. 18. 9, 2.2· O,o "~'9_,5 '28.6 ' 9'962'.- 23; 23,' -q-.7" '2:3- -' 2.0 89, '23. -5. 23. 9. 2.3 0.0 m8.5 2~.5 ........... 9-~6'?; ..... ~2; ...... -4~-; ....... 8-;~- ....... 5-;4 .......... ~-;8 ....... 8-7; ..... 2e'," ~'." 28. 9 72. 25. ¢29-.- - 5.~ 3.3 ~.~ 8~. 30. ~0. 30. 9. 2.3 O.0 (6.1 2~"5 ' 99¢7; ..... ~9', ..... '37- '-- ~"~2E- -'. ;;~'~;"~~;:: ~".,3~''83;;'--~8-; 12. -~8-; "e. 2'.~ 0'0 9982;" 27. '26. ;". 5.,7..".. /2.~-~:",..>~2..3. h9~..-2~. ~..'2~. 9. 2.3 O.i ;~.~ 21.'9 .... 9987-; ..... 3~,--;$O;--'' 5~'~-=~..;:.'2',- -- ':' 89;:---51-.7.' ~1" ' 9992. --5i. - '~i*: .... 6;5'<.-5;- ::;'- i_8'2. _ 5i. 16. 51, 9. 2.3 0.~ ;8.6 25.2 ..... 9'997~; .... 6~"'- % -_ .' q.',;2;~ .' 'J 8~"""->3~':~'_; -25'; ..... 3~' 9, 2.3 ~0.0 ';~'8 26.3-' ............. i~00-~;--'~-1-~; ........ ;i'09;-"---69.. "~O'e; ...... mO";~ 2'V ' 0'2 ~5 ',3 -~ 0' .-0 lo0'12. -9~. .... 89. 8,8 ZO.9 8'~ -~75. 97' 6'9'' 97. .......... ....... 6!. _ 82. ;:"%. 82. 10022. 58. 56. 9.g 8.7 6.8 76. 66. ~6. 66. 9. 2.5 0.0 13.5 13.5 ......... ~.-Z-O02?;' .... s~; ...... ~-; ...... ~-o-;-~ ......... &-;'~- ........ -~-0 ...... ~0--; ....... 58'.' ~'3'; .... 58, 9. 10037. 61. 65. 10.5 9.~ 5,7 ~8 8~ 63. 8g 9 2.6 0.1 ~3.1 8.3 ........................... . · ~ _ · · -- _ 100~2, 7~. 86, 7.0 6.5 6,2 76. ~7. 62, ~7, 9, 2,6 0,2 ~2,q 8.8 -zoO~2. 53."-55, 7.6 6.6 5.0 78. 57. 36. 5~. 1'0072-,q2. 56. 9.8 5.7 v.~A-8~-, ~9. ~7. qe. 10082, 77, 9~. 9.1 9.3 7.6 72, 81. 92. 81. 9. 2,6 0,1 12.q 8.7 ' Z0092.--&7-'. .... 92~ 12.6 8.5 7.7 7~. 90. 77. 90. 9. 2.5 0.~ ~5.9 9.7 ..... i0-o~?';-' Zoo-;-- '~-~-; ...... 6;~ .......... 6--;--b ...... -S-;-~'--¥6-,-'-Z-1-7,--'9~," i17. ' 1010'2.'~-'07. --9~.- - 6.~'- 6-;-7 ..... 5,-6 -7-~. 'ZZ2. 99. ZZ2. 9. 2.6 0.0 ¥6.3 6-.7- ....... z8~o-7';'-zos. ..... e-a-; ....... ~,z ........ ~';'~- ........ -6';~ ....... ~';-71~;._' 98, ~Zs. ..... Z0~i~. 126. 98. ~.~ ~.9 ~.2 80. ~50. 93. 130. 9. 2.6 O.O 16.9 5.8 .... i01~?,' 102-;-----[D8-; ........ 7;--~ ....... ~,.8 ...6,5 ...... 75;' 122." 92'. 122. 9" 2.6' 0.0 ~6"8 '6',"~-. 10122. 105. 96. 6.7 5.8 ~.7 77. 131. 9~, 131, 9. 2.6 -0.0 20.8 6.3 ._.zoZ52,~7.,_.~9_7t ..... 5.,_z. _~_*~,Z ..... 5.._e .83.,z,~...9o, ~**.,zo. PAGE 5 SOHIO ALASKA PETROLEUM COMPANY D.S. GR1 IS RUN WITH DIFL~i,GR2 & SPe ARE RUN WITH BHc/Ac. · ' DEPTH ..... ~R[';-' ~P:i':~F:Oc' RiLM'' R'ILD AC-'GR2 SP2' GR CAL FT, API MV APT MV API IN DEN CORR G/C CN DENP. ioi37, '1i'5. 97,_ ._ ~'.'6 '3.7_ _3-2 83.' 155. 89.' 155. 10. 2.2 0.3 ~8,6 28.7, 10142. 99. 96. 6.7 5.A S.O 80. 152, 8~. 152. lO, 0.1-~.0 1~.21S5.5 .... 101~7."'i20' ...... 96-; .... 5.7 -' 3';~- ' -2;9-~-87' '662-. '86'.' A62. 10. 0.1 -4.0 ~4.11~3.5 i0Z52. Z~9.-' 95. ~.5 '~.e ~.~ as. 7. 82. 7. so. o.i-~.0 _.3.0~53..5.. Z0~57,, 12. _96~ ~,_~_ ._3.G 3.3_ 87,. 7. 83. 7. ~0. 0.~-~.0 ~_5.5~53.5 1o~62, 115. 95. 6,0 5.0 4.5 80, 7. 101G7;"~9-, ..... 93. ....._5'-~-'.-4,.~--.'-'~-,0.'-"81, . 7, 75, 7. ~0. 0.~ -4.0 ~5.5153.5 ~0~72. ~21. 92. 4.Z 4,~ 3,7 8!. 7, 73. 7, 10. 0.~-~.0 .~5.5153.5 '1-0i77. ll6~.-'-92--; ...... ~"0 .... 3-~--3--'_-~-3'0'--~'~ ' 7.' 69.' 7. 10. 0.1 -~.0 ~5.5!53.5 'zo1-82; 'Z22;'-' 9o;" 3.3 3.2 2.9 ~o. 7. 66. 7. ~o. i~187;--1'1~-. -'~7, ...... ~'-0 .... 5'.-7 3-'0 ~0, ' 7, 77. 7. 10. 0.1-~.0 15.5153_.5 _ '10192.-'117. 85.' ~'.~ '3.a ' '3.0 ~0. 7. 99. 7. 10. 0.1 ~.0 !..5._5~53.5 . ......... i-0i9-7" .... i-i6; ....8-~--, ...... $;'-4 ....... $.A ......... ~'.0 .... ~0'-, --7.' 10i.'- '7~ 10. 0.1 -~.0 ~5.5153.~ ....... i-0207;-z-16'. 85. 3.~ 5.~ 3.0 ~0. 7. ~01. 7. 10. 2.6-~.0 ~5.5 7.8_ 10-2Z2'. '1Z6. '-85," o.z 0.1" -0.~-- o. '. o. i b 2i'?-;-"i-i-6~; ...... 8~, ..... b-.--O- ...... b-;-O~ ...... 0~'-0 ....... 0-'-.-- o. o. o. o. o.z o.z 0.z~52.6 SOHIO ALASKA pETROLEUM-coMpANy D.~. 8-21 2N' CURVES · . -RFDC R.iL~ RI'LD C"-.F_-o[_-C!_LM-_C_.iLD SP]_'.---.'G-~'- RFcI RLM! DEN CORR GR5 CAL RLD1 CFC1 6LM1 CLOl ~P~ 'GR1 -'. . FROM 6950.00 TO-- i02'20, 0 0 ...... LEV_EL SPACING __0.,2500 62, SAMPLES PER RECORD PAGE 10 SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 $R5 AND 'SP1 ARE RUN WITH DIFL RUN NO''I' DEPTH GR3 SPI RFCI RLMI RLD1 FT. API MV 7010. 90.7 100.1 2,6 2,& 2,4. 7020, 96.8 98.7 2.& 2.8 2.3 7050, 99.5 96.2 2.9 3.2 2.7 709'0. 96.5 97.8 2.& ~.0 2.5 7060, 103.9 98.0 2.9 3.~ 2.8 7090, 106.5 100.~ 2.~ 2.7 2.~ ' ' 7100, ...... 1i-9-~5 ....... 9a.7 2,9 -B','~' '- '2i7 7140, 115.0 105.7 ...... 2~2 ...... ~,~_ 2,2 7z~o, zoo.~ z05,0 2.~ 2.0 ~.7 7270. 82,8 107.5 2.~ 2.& 2.3 ..... .. 7290. 87.~ log.1 2.~ 2.~ 2.0 ............ ~ S 0 0, ......... 9-0;-~-- .... i-O-7-~i ........... ~-;-~ ............. -~-'i~- .............. 2-~ 2 ......................... ...... ~.~.0_~ ........ ?__~__~.~_ .... ?_977_? ............. 2_._~_ ............ 8._5 ......... _a~__~ ........................ ...... ~s6-O-, ........ 96-;-~ ..... i-O~- ;--~ ........... ~-~i ........ ~-,4 ...... 2-,0 ............ ........................ 7370~ ~00~ ~08.~ 2,2 2.3 2,0 ' '7~8'0; ......... Z05';'? ..... ~-08--,--8- ........ 2;-2- ....... 2',~ ......... 2,-0 ....... 7410, 92,2 109.3 2.1 2.2 1.8 -7~20. 8~.8 109.S 2.0 2.1 1.8 -' 7~3o. 9~.~-'i0-9'.i-' z,9 '2, o '1.7 . .. .... ~'~40, ..... 96,'-2 .....Z0-9,'2 2.1 2.1 ................ 7~50. 98,1 109.5 2.2 2.5 2.0 7~70, 87,5 [lO.[ 2,1 2,~ 1,8 ............ 7~90. 1'02.5 i09,6 2.2 '2.~ ' 1,9 .............................................. PAGE SOHIO ALASKA PETROLEUR COMPANY D.S. B-21 GRS' AND-- SPI- ARE RUN 'wITH OiFL' RUN. N0.-1,' ' DEPTH ..... GR_3... SP!_ _RFC!_ _._ .R_~M!. _RLDI FT. API MV ' ~500.'" 95.7-' i09'8 .... 2.0 .... 2.0 7510. 9~.8 109.9 2.1 2.1 .... !._,8 ....... ....... 7PS..O.., _ __.7__0.~_6__ ___ z~i O__._?. ............ !_._P ........ 2._.._:t · 75~0_. ..... 83, 7_ __i10. 7_ ....... 2._.o ...... ....... ~560.._ .8?,~__ ..Z__~O._.,~ ....... 2_.__i 7570. 81.2 lll.o 2.0 2.~ 1.7 .. _ 7580. _.75..~i_. i_i._O?5 ...... 2-~_ ...... 2.~ ..... i-~_ ._ . 7590. 90.6 111.5 !._-_~ ........ 2_-_~ _._ Z.7 ...... _.-.i-"_~'goO-,--/8-2;-~-.-.'i_~i_._7 ..... _~.o _ ........ 7_..6__!_ 0.., ........ 7.P.,_.~ .... i_ _z __l___.__ 5 ............ 2~._-_1_ ....... _2___._ ~ ........... _l._.._~ ................................ 7620, 90,0 112.~ 1.9 2.1 ~.7 ........... Z_6pO, ....... PP.__.a ....... .z_ z__2_. ?. _5_ .......... .~_,_O ............. ?_.,_.2 ............... _!,_e .............................. 7650, 85,9 l12,q 2.2 2,6 2,1 ............. ~-g-~-b'; ...... i~8 ;-7'."/ii'~;'-g.:~'7:-~:';'8777.'~;-~;:~-'7:-~-~ ' - ?~o, 'io2.6";~:zZ~:;0':...? j;~-:.:..'--;~.!.:~ i.::' 5 ' .............. ~?00-,- .... iOb'-;~ii~,~'-l:~ ..... .;2,:'~:.'.:.? ':'-. -' '~-?:l. 0. "8'-0,2~. 'z-'i2"~.:.i - -~-- ~...~;5 . ....... -7'~t2-'0-; .... 80'.-~ ~ '...:.:: ??~-Oo -' 78-;-~".' ..~-'..:i :..~.----" ....... '-' ........... '.'i ....... _ _ .................. ~v-~'o-; ......... 8-~-;-~::.~ .z- ...... ----. ..... -" - ~'75-0o -' -8~-,5 zz~-~- 2.~ -2,-~ - ~-~- - .... .......... . ...... ??__~---~; ...... _~_~so.~ 7_'* ....... z,s.~,- _ _ ............ zo~ . ~.~. z., . ...... 7770, 76.8 115.1 1,9 2.0 1.7 ........... ~7'80; ....... 9-6 ;-~- ..... ii 3--;-~ ............ 2- ~i ........ -~-;-2 ........... i ~-8 ............... 7790-;-- i-06;--~ -ffi~-5 -'--2.~ ......... 2~;-6-- '2.1 ..........7-8a-0 ;-- ' i0-6';-'~ ..... ii-~;i ........... 2--;'d ......... ~-;-f ........ i ;-? ............... 781'o." 1'12. S -iz~-;-8- - 2,~ ..... 2';-2 ' 1.8 ........782-0 ,-- -iOi, 9 .... ~i0-;'-~ ....... -2--, ~- ...... -2-;-S- ........ 2,1 ............ 78~0;' I:L~15- i-'l-i,-~-- 2.2 2.~ 1.9- ...........7-8-~-e; ...... -Z-O-O; 0 .... i-:t-~-;--~ ......... i-; 9 ............ i,--e- .......... i;5 ................. _ 7850. ~02.~ -l-z2'-s ~.8 1.~ "1'1 ......~ 60, .................................... 128,~ 1100~ ............................................................. 2~0 it~ 115 7870, '~6g.'9--~-0.8 ~.9 ' 1_5 ' 'io~ ' ....... 78~0'; ...... -i~-~-;~- .... iiO-;e ......... '~-.d .......... i"~- ....... Z;~ ................ _ ' 7890. 18~.2 iiz.~-'-~-.0-- -1-.~ ..... l",s ...... 7eeo;- '- i?S;g .... iii-;-~ .......... 2--,-i ......... i;-¢ ....... i-.6 ............... '79~0. ...... 195;4' 'li'O.t - 2-,5' 2.s ~.9 ..... __~'2o :.- -2~;¢.. ~.Z~.o.----~i-~';_'~ ...... _!---~-;-~_--"_--'-~;-~ ......... . 79S0, ~52,9 ll~.g t,? ~,2 1o0 -7-e~'0," 'i~-?-, 7' iiS-i-2 ....... ~,-g ......... i-;-i ........ 0,9 ..... ?950.' 16-5.6-115,5 ..... f.? --i.2--' 1.Z .... 796'0,-"162;0 ...... ~i5';0 ...... Z;? ..... ~-.~ .... z'.O ..................... - 7970, 157,1 114.1 1.8 1,:~ 1,1 ...... i98d-."- 158,5 '-'ii-~-::~ ....... i'2~ ..... ~'~l ......... 0,'9 ' 7990' i9~" 5 112. ~- 2.1' '1,9 - 1.6 PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 -'GR3 AND'SPi- ARE- RUN wiTH-DiFL-RUN"-Nb-."i, ..... .... DEPTH ...... GR3 ..... SP1 '--RF~'I ...... RLM~ ......RLD1 - ' FT. API MV .... _~OO-O. 'i67.5 li3.'9 ........ 1"7 ....... 1~4 1,2 ~olo.'--ifi~.5'~i5 :-f ~.5 z.z 0.9 ~020. _1_2.0 AO:50,- 150,5 11~,. 9 1.3 0.7 0.6 . ~050. 1~1.6 115.6 1.5 0.9 0.8 .......... aO70. 174.8 11~.0 2.0 1.~ 1.1 ~090, 17~.7 i08.4 ........ ~_~.~_D.~ ..... !?_07~ _ ~120, 140.1 100,4 2,8 2.5 2.1 ~130, 130,1 100,9 2.9 2.9 2.4 8i50. 152.~ 109.9 3.1 2.8 2.2 a270. 1~9.1 ~0.7' ~.~ 3.5 2.9 ............................ ....... ~280, ......... 89.-~ ..... iii;-i 5.7 Q. 8 3.7 ~290-' ' 98,8 .... ilO-~-~ Q'.2 .... 3.2 - 2.7 .......... A-30-O'~ .... 12-~;-8- ....... R'310; 175;2 ......... a~2'd' ..... iTa';-~'- '~330. 179.1' --10~:'8 '-3.'3'- ~.~ ..... 2-.1 ' .......... .... R350", ~09.7- '-IO~B" - 2.5 1.8 1.5 R370. 185.2 107.0 2.1 l.a 1.5 a3-90. '189;3 1'06.1--- ~-,~ .... 2-;-0 ..... 1'.'5 ' ........... ~o0,'- -2'07-,-0--- ...... a'~-2b. .... z-39.i .... -z-O~-;O ......... ~-:'7 ............ ~,-~' ........ 2','0- ............... .......................................... ~30. 121.5 107.6 2.0 1.7 i.~ R~50, 100.7 108.3 1.7 1,~ 1.2 ........... ..... ~Go; - '1-o022'- '1-08: i ....... i2'7 ...... i.G 1.~ · ~ 90. a~. 0 -io 5.5 -- ~; 0 '2. o i. 7 PAGE SOHIO ALASKA PETROLEUM COMPANY D.S. B-21 .... GR3'-AN'O'SPi ARE RON--WiTH-DiFL'--RuN-NO'o ~" ..... -DE~TH ..... GR~ ..... sPi ......R'~C-i ........ ~'~M1 ..... R-LO1 FT. API ~V R50'O. "82.0-- -~04~5 ..... 2,3 ..... 2.2' ~5_!_0..~ ..... 7_0 ,_~ ...... __l_OS.. 7 ...... g..~ ........ ~.,_? ....... B520. 72.5 104.3 2.7 ~,.2 ..... 2.5 85S-0~ ' V7~2- ~05~-S ........ 2.6 2.9 2.5 ~5~0.. .!_08,9 ..... ~10.1 _.~.6 ..... !_.! _ ·0.9 A550, 105,7 110.2 1.7 1.4 1.2 ~'sgO-, zoo.2-'-iO'~-~'~ .......... i--,-~ ........ i-~~' ~570. 106.2 llO.G 1.6 1.3 1.1 8600, 96,0 110.1 1,7 1.G 1.3 ~0. ~0o.~ -zl~,-o -' ~.v ~.~ 8~0. 107,0 112,9 _~ 177_ . !_-~ ...... a~5o, ~0~.~ 'i~.~ ~.~ ~.3 z.~ ~-~sTo, "9~. 5 -~s ........ ~.-7 - ~,~ ~ ~-~0: ..... ~ O~ ~-~ '~-ii~.~' ~.~:~--Y7-i':~:.---~ '.-~:~-~-:~~ .----~-i;i ...... . a.' .................. g7-~'O'; .... i'b-~g- ; ~7-7'0. -'105.6' 115:-0 - 1;-7 - 1.3" A780~ ..... i05-.-? ..... i'i-~--,-'3- ............. i',~ ...... i-'~-~ .......... 8790-,- lOi-';4-- 'ii~':i ..... i,'G ....... i.2 ' i.o a~i-o," 91~l ll~.~ ~.~ ..... ~.~- i'.l AS~O-. ...... iO--S-;5~ ..... i-i4%-~- .......... i&G 1.3 R850, 103.5 113.9 1.6 1.2 1.1 a~90. -~o~'.~ 1~4.5 ~ i.s - ~',~ ~'~.~ 8910, 115,5 114.5 1,~ 1,~ 1.1 8930, 103.~ 114,3 1.~ 1.3 1.1 89-50;' 1'07.6 ~-~.5 .... 1:'~--- ~.g "-i-.-i ' PAGE SOHIO ALASKA PETROLEUM COMPANY D,S. B-21 GRs' AND-'SP1 ARE-RUN- WITH DIFL-RDN N0; 1. ' ' 'DEPTH ......... GR3 ' SPI .... R~I ........ RLMi'- RLD'! ' FT. API MV 9010, 8q,2 116.5 2.1 2.0 1.6 9020. 8~,6 113.5 2.2 2.2 1.9 9050. 85.8 115.9 2.~ 2.4 2.0 9060,. 1.02.5 . 117.8 1.9 _ 1.3 1.1 9070, 117,1 118.0 1.7 1.5 1.1 ~o9o. 9~.7 119.2 i.7 1.2 1.o 9100. 118,5 118.~ 1.6 1.2 1.0 ........... 9110. 110,~ 118.5 1.6 1.2 1.0 9120, 119.1 118.5 1.5 1.2 1.0 9~o"' ~15.9 i~5 1.~ 1.2 915o. 122.9 119.a ....... 9200". ........... 59.5: '-"-i20~-9.' ........ v6;:3:'. -_ '".' ~.1 ' - ' ~210' -'9~;4:-': .... 9250 ;- i-~ 0-.-i- 122.5 1.7 1.~ 1.1 .... . .... 9270. 120.1 125.2 1.8 1.5 1.5 ' - 9290-,- llg;4 .... 12-~.2 ....... ~6 ........ 1.2 i. 0 93~-~. --- 10-9-. ~ 12~.2 1.7 I.~ 1.1 9350, 111.0 123.5 1.7 1.3 1.l ...... 9'~0, ..........0'-;~ .............. . RECEIVED TGTN..I ~TTNUA~ION # :01 ~VTOU$ R~£1, ~N~N~$ I~,IBR~RY ~A~E TGTN. I~000 ooooooo~0oss oooooooo4oss oooooo0,2oss oooooo004o~s oooooo004o~s oooooo002oss oooooooo~oss oooooooososs oooooo004oss ~P~NY c $0~0 A'LA~K~ PET~OI,~[J~ ~O~PANY ~P~ JTN Ko 'P~ rt.,U~i~ = C~U~E OTL ,UX~ L:EV~, = , ~. DATA FORMAT R~CbRn ** ~YVg s'~r ~rpR c~o~ ~Y 4 I 6,6 I 8 4 7~ ~0 0 ! 6~ 0 ,PT ~ 0 0 0 sAC ~s, eps o [CP P$~ eu o 40 ~G P$~ CU o 0 0 0 o ~ PS~ CAP! 0 31 32 0 0 4 ~C~ Ps~ cps o o o ~C PS~ ~P~ o o 0 ~DT PSP ~P~ 0 n 0 ~T PS~ ~ps 0 n 0 [~ P$~ ~U 0 4n 1 ~T P~ o 4~ 1 ~C DS~ CpS 0 0 0 ~T U$~ CPS 0 0 0 ~T PS~ ~PS 0 0 0 [~ PS4 ~U 0 40 1 ~TG PS4 ~U 0 0 0 ~AT PS4, 0 4~ 1 ~ P$4 ~P! 0 31 32 ~Ck PS4 CP~ 0 0 0 ~C PSa eP~ 0 0 0 ~T P84 ~P~ 0 0 0 ~T PS4 ~PS 0 0 0 ~ P~ CU 0 40 I ;~G PS~ ~U 0 0 0 tit PS5 0 4~ 1 k~K PS~ CP~ 0 0 0 ~AC P8~ CP~ 0 0 0 CDT PS~ CPS 0 0 0 ~T PS~ CPS 0 0 0 ~ O~?~ ** ~? tols~ooo ~T -qgg.,~500 ~DT '999,.~500 ~TDT ~T -Q99.2500 CR C~T -090,~500 ~.aT -09q.~500 PDT -099..~500 ~TDT ~aT -090,~500 CDT -99g.~500 rT~T CDT !57.06~7 ~AT P~T -990. '99g. '999, 1750' 140, 139. 250O )soo 2500 2500 2500 ~500 2500 ~500 2500 $000 0000 5000 02?3 5625 1250 1707 19~3 0375 0 0 4 0 0 0 4 0 0 o 4 0 0 o 4 0 0 o 4 0 0 o 4, 0 0 o 4 0 0 n 4, 0 0 o 4,, 0 0 o 4 o 0 O ,4 0 0 0 4 0 0 o 4 0 0 ~ 0 t~ 4 . 0 0 ~ 0 0 0 4 0 0 o 4 0 0 0 4 0 0 0 4 0 0 0 .4 0 0 o 4 0 O 0 4 0 0 0 4 0 0 o 4 ~ACK PACK $IC~ ~ACK -099.2500 -099 25O0 -999 2500 -ggg ~500 60.~500 34.3164 !.10.1408 3~,$711 36.~03 190.~000 34.6406 FBAC FBAC ZBAC PBIC FSIG FBlC P~IC '999,~500 -99q'250:0 '999,2500 '999,2$00 '999,~500 -999,2500 lo.oo.oooo 6406 31,4t64 8o'99al 30,~30B ?5,43?5 000 0~1 6094 ~417 0000 9900.0000 ~.4004 ~0~.7500 ~DT 931.1250 ~aT ~DT ~AT ~.5742 97oo: o°o r~T ~AT ):~A9~4 rDT 217..~750 ~AT 1.R406 ~T 720.5000 ~AT £DT ~43.~945 IAT 1.6177 r~? ~69.03~,3 rDT RAT ~.~4~)3 FTDT CR FTDT FTDT ~TDT FTDT FTDT CR FTD'T FTDT FT~T FTDT FTDT FTDT FT~T FTDT FTDT FT~T FTDT ~R FT~T FTDT FT~T ~R 'FT~T ~R -:' t,,TlO ~05 ?198 184~ 19~ ,3750 50 06~8 1 O0 ~000 ~]5.6250 J. 29.~750 120.2500 ~.:'6 ,. ) 906 190,2500 ~'5,4063 ) 97 ~250 ,.'lj ~,~ 500 1R0.8750 42.'/500 ~ 94.6250 267,3828 36~,)125 40.093R ~63.0000 43.'~81. 3 ~4,. 0938 3~R8~0 35.0645 ~51.4902 52.)406 RA,CK RA~K RA~K RACK ~A~K $ICM ~ACK SIaM ~A~ ~26.'8125 10',67~9 161,~5 0 ~0.1406 ~40.12B0 ~83.0000 15,.9062 15.8608 ~16.4189 ~17.~750 F,SXG FBAC FS~G FB~C Fs~G FB. AC rs~c FBAC PSTG FBAC rBAC FS?G FBAC Psxc FBAC reAc FSIG FBAC 4~ ~47~ 20, 3:13 96 6~5 I~ 'g844 .~1~7 17.1562 57,7500 1771094 70.0000 7'5.8750 17 0938 7 4375 ~]~0000 ~] ~2~0 96.9750 (2.7967 97.037~ 16~4819 82.~430 DT 32~, ,~750 :DT 32 P ,. ~ 16,4 WTDT 'DT ]5~,~5918 VTDT DT' 35~ ,. ~500 WTnT 'nT ~29. ~4~7 rT~T :PT 9~on.'. nOOO 'BT ~94..~9~8 ~TDT 'DT ~4~. ~. o000 rTDT 366,. 06~5 WTDT 352.~000 'DT 41],.n000 ~DT ,42~,. 5000 'DT al ~ ,. V5~O FTDT ~aT ~, 0260 ~R :~T alo.oooo r,rnm ~T 4,.n3no ~T ~07. ~555 9~0~. 0000 -~9o.. ~$,no -o9~.~5no -o9o,. ~500 -090. 9500 5~ . '~ 055 24 ~.. ~: ~ ,.~'7 950. ! 240 307..9175 ~g],.O000 57' ~76,6 ~65.5000 ?75. ooao 13~',. ~'1, q7 ~ 56,. ~3 I: 3 265.531 ] 236,5000 ~71,62'~0 ~ 75,4375 260.0062 .63~ 900,.58~0 7~. 4375 ?03. 0000 917,.5000 ~6.535.2 223.4375 q~,.n264 911.4277 .oqo. 950o -qgq,~500 'OgO.~500 .egO.. ~5nO -~90.~5n0 ~mCK BACK $I G~ SIG~ ~AC'K ~ACK ~ACK BACK RACK SIaM SI~M RACK RACK RACK 2~ 1 ~. 3750 ~ 23,.0 3 ]6 1 g, 1968 226.0000 10.6406 ~03,.~000 ~25,. 2500 20.4072 1~,. 5645 28. 4688 ~4~,. 7~66 3~. 781 3 ~30,. 1250 3~.4009 ~31 3~.. 37~1 933.1113 -09g~2500 -o90.25no -09o.75oo .o9o.~5no ~090.9500 -090.2500 16 :. 9~,~2~7 1 ?. 0859 1:7~ ~976 1, 06.3125 16,,' 57~1 97,, e750 16-~566 107'1250 1 04 ,. :4 ~. 05' 34 , , ~ 2~. 377 1 25.6406 i 24 .. ~ ~ 25 1 45.12'~0 2~. 0873 24. g I ~ 5 ]6.68~5 90,. ]8. ~500 38. ]066 110,.0000 37.31,25 ~ 10.0000 -~99. ~500 -999~. ~500 -09~..~500 -~90.2500 '~$O0 -q99,,2500 O0 O0 ~,IG~N :eooo ??TNt. YATI~N # :01 ~T Th, PF NA~E 1- TAPE ********** RECEIVED JAN 2 9 1992 Alaska Oil & ~as Cons. Commission P.A G:g .' " ,, . , ". ~ ~'~'", t,:: "ii" i::~ ..i (' ~''''.,< '" t~,, ,,~. .... :;. :.! ~., I:~ 'T ,.r) [~'i ~:.~ ? F T "~, (~ :,. / , ~., ~,. , 1' C ,u ~"~"~ '~ '~ (.; ~:'~ .7: ..... , ~. ~ ,,~ ~'~ ~'' f 3 ~ ' ~ K' ,E ~ ~" f .... 'F' '::' ! (.'.' P f:. ;[ ~ '~ ~' r i",' ~ ('f ? f,.j t'.:~ X' C ~"' q'." t :'.: ,C, f:~ ! · ..... ~ 1' PAGE: 2 3 0 7 3 6 1,85 9 972 73.94:5 73.~2 2935. 593 79.801 1o830 9797,023 920 269 -999'250 75.25'8: 1,991 21177.000 4276.000 19,984 54,32 4: '3.862 1.7399.395 35.526 1241,1.25 !::." 3 :"' r, ,!::i~ 7 1! !'~,. 57. '.~ 7 :.'.:.' 7 ,,, k: ,, ,~ m . ':% 7 (~' % , ~' , '.:~ ~;~ ¢':'~ Q ,, . ~ ,, ,,, . .. ~ .~. ~., ., . ~ ~., ..... .. ~ ",:':' % t % , ,,,, ~ . q 4 :~:" ';. 5 ', ..,, * , '::'~ "7] ,% ~ , 0,(,~ 2 ,.. · r:: ,, '" '1 · ~.'4 , · ~; ... ,, L"i , :' ,.:~ -.~ ..~ ~ ~:: '~ :~..."~ "~ 7 ,:'~ '"' ~"'"~ {,::' 7 '" 7 "::;' 7 2, .':' ~ ': 5:' !:]) 't ~ ;, 3 · , .1~ '. ,! 313 . 752 5 '959.8 '? 5 3 7 1. ':,.~ 7 '8 67.~.8t ! 7 ]~. 690 2 7 9.2 ~l~ 2 .647 7~,616 12065.848 169,795 !999o250 75.180 2.139 22967,125 4455,063 23.672 79.397 3.459 4978.685 494.760 50.$88 P A G E;: 1,0 t. f'" ~,~' i:-~ il::;I 't !'~ ~',' ';:~ ~:'; ,'4 ~ . · ? . ~ .. ,.. . . .~ . ...... .~., .... ...... ~ , 1 "'~(':' I ] , , ,.,' ... ...~ ~ ..' . . '::'~ ~ 3 9 '? . , , ~ · 9} ~' ~ .. .... . , .., ~ '., .... ,., ..... ., .., ~ , .. .... ..... ~ .. , ~ ,, ,' .,, , ~ ,,, ~ ,,, ,,~ . ~ , 9 '''''~ :'; ~ . ~, :7:, ,,'?, ., ~ , <"" *:~ 3 ~ ,., ~., C' '"' ' '"1~ '~ ~, .~ , ~ .," c.,, !;',, ,;:., '7 ,, 5 9 !:; 3 !, {'! ,,a ~:' 2 7. :5 3 7 7~ ;,: ~:; 5 . · } ".,7 "~ '7 ~::'~ 5 ~, ,~ .. '~, .2 '. ,, 3 .,, .. ,11,,3 79 192 2 234 1,1099 422 1,082 630 -099 250 75 037 ..t..434,000 24~68 , 750 3(5,699 6.3,500 3,897 !.4444,572 764,340 51.,2!.9 P A G ~.;: 1 4 er,ithmetic avera .~e PAGE; 79 801 1[830 9797.023 920.269 -999.250 75,258 1.991 21177.000 4276,000 19.984 54.324 3,862 17399,:~95 123,5,526 ! C:~'~ ":': ?o q '1 ~' '! '"' ,'i. r, .,r.. '~ !':.~ i: · .' . ~ ,. . ,.- "ii" in last 'l 7 19 () (', !.'.., ("! :} !') t; '"~ ~ '", 0 ('.~ :! ',,, .. !' :.5 ,7' ~'i'~ (.;, ~'; q c: ~.~ 0.0~0 1.38.057 0.000 3,8!8 0. 000 0,000 · ,. ,., ..,, ,. , ...... ., ,.,. , ,. ,. PAGEt 56 760 942:235 1245.265 402,462 1,0.320 8'8,826 11.932 189,394 1.235.000 1.7.977 78.689 70,019 0.211 0.358 9272 598 1870~857 50.310 985.577 ]245.993 961.538 7,740 332.532 468,750 673,077 1.500.000 76.536 46 05 0,503 1,.376 4~82.436 315 1,22 129 000 1137 820 ~346 154 600:962 15.480 272.436 332.532 148,237 1415,000 2 o 21 ,~ 'oa$ s i n fast 2'3 P A(;E: ¸24 76,536 46.205 74.824 0.503 1.376 41~2,436 315,122 72.240 1003.788 1,363 636 487~689 30,960 336,174 464.01.5 , 'F , ,,., .,. ,. , ,- , gAGE: 25 194,129 1200,000 21.427 71.950 0 375 9447 11.5 1828 528 85 140 993 590 1229.968 1077'724 15'480 3.42,262 446,429 680.803 1465.000 66.522 84,942 37,501 0,000 1,906 1573,482 1,59,686 123,840 5~.6.827 608,974 396.635 15.480 128.205 144.231 100.160 1335.000 PAGg: 26 i,n last f:lle 2"/ P~GE: 2,8 ¥ ~.:"' F' (". 1', a ~':'.,.,,..S .:4 r .' ?":~ !!~ ~; ?,'F' ,q .r,.,~ v. t,~ .... ,,v L,. v' ?. C c,, [) ['i'; { t-.,f l)] × ) 29 66,522 84.942 37,501 0,000 1,905 1,573.482 1,59.686 11.8 6~0 1,027:462 114:5,83] 568.182 30.960 312.500 ~2~ ~0~ 222:538 1,270.000 21,145 73.475 64.746 0.393 0. 395 92R3.229 30 '~ o ,'.ii a I','~ ?? ~ ",". R '::~ :~, 7 277 ~ I?'~., ~ .... :2 5. ~"~ .~ T C ~:~ :.,~. ~'~', ~:¥ 3 I 3 5 1 5.4:, .3,1, 237 ~i. ~"~ '~ ~:,> ~'','' "~ i~,;~ ' 713 ..... ...... :.,, .:~ , , ~ .4,1 . ~ ,, ~ . ,. ~ ~ . . 7 r::,, ! 2 r..: '~,:, i:i. :'~ '3 5.1.5 3 '1 .1848.085 87. 720 1~37 , 660 1. 1,7.949 1.185.89'1 11 :, 61 0 ~.~, 455 72,721 6],457 62,737 0.406 1'963 3320.879 203,207 ~!2.230 865'385 ~041,667 440,705 1..9.350 232'372 26~423 1,365.000 P~GEI B -21 PRUDHOE BAY Run 1' 1 - May - 1994 CNIGR Cased Hole 9321 WESTERN ATLAS Atlas Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: OWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD lST STRING 2ND STRING 3RD STRING PRODUCTION STRING B- 21 (12-31-11-14) 500292085000 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES Il-MAY-94 5718.04 L. KOENN R. MAYS 31 liN 14E 674 1896 79.75 78.46 36.60 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9358.0 47.00 7.000 10198.0 26.00 5.500 9019.0 17.00 4.500 9178.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 26-NOV-82 SCHLUMBERGER WELL SERVICES BASELINE DEPTH 9321.0 9371.0 9373.5 9375.5 9384.5 9387.0 9390.0 9392.5 9393.5 9403.5 9412.0 9414.0 9419.5 GRCH 9321.0 9369.5 9372.0 9373.5 9384.0 9386.0 9389.5 9392.0 9393.0 9402.0 9410.5 9412.5 9417.0 - EQUIVALENT UNSHIFTED DEPTH 9421.5 9423.0 9433.5 9434.5 9436.0 9442.5 9445.0 9448.0 9452.0 9455.0 9467.0 9473.5 9476.0 9482.0 9484.5 9487.0 9490.0 9502.5 9511.0 9513.0 9516.0 9517.5 9520.5 9524.0 9535.0 9537.0 9539.0 9553.5 9557.0 9568.0 9569.0 9570.5 9584.5 9595.0 9612.0 9616.0 9627.0 9643.0 9652.5 9676.5 9718.0 9774.0 9782.0 9803.0 9805.0 9817.0 9819.0 9822.0 9824.0 9825.5 9828.0 9858.0 $ REMARKS: 9420.0 9422.0 9432.5 9433.0 9435.0 9441.0 9443.5 9446.0 9450.5 9453.5 9465.0 9472.0 9474.0 9480.0 9482.5 9485.0 9488.0 9500.5 9509.0 9510.5 9515.0 9517.0 9521.0 9525.0 9532.5 9535.0 9537.0 9552.0 9555.0 9565.5 9567.0 9568.5 9583.0 9593.0 9610.5 9614.0 9625.0 9641.0 9650.5 9674.5 9714.5 9772.0 9781.0 9802.5 9804.0 9815.0 9818.5 9820.5 9823.0 9824.5 9826.5 9858.0 CN/GR CASED HOLE. LOG TIED TO BHCS DATED Il-DEC-82. CN LOGGING PARAMETERS: SANDSTONE MATRIX CHISM OFF CALIPER CORRECTION = 10.625 IN CASING CORRECTIONS OFF SALINITY = 0 PPM. OPEN HOLE GAMMA RAY FOR DEPTH MATCHING DOWNLOADED FROM BP EXPLORATION UPS/CSS ON 04-MAY-94. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ??MATCH1. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9330.0 9828.0 9342.0 9836.0 BASELINE DEPTH NPHI 9321.0 9321.0 9410.5 9408.5 9411.5 9409.0 9412.0 9409.5 9413.0 9410.0 9419.5 9416.0 9422.0 9419.0 9432.5 9431.5 9435.0 9434.0 9440.5 9438.0 9444.5 9442.0 9466.5 9464.0 9473.0 9471.0 9473.5 9471.5 9485.0 9482.5 9502.0 9500.0 9507.0 9505.5 9507.5 9506.0 9511.0 9509.0 9525.0 9521.5 9526.5 9523.0 9572.0 9569.5 9584.5 9579.5 9616.5 9613.5 9618.0 9615.0 9627.0 9625.0 9628.5 9627.0 9638.0 9638.0 9653.0 9652.0 9674.5 9673.5 9679.0 9676.5 9680.0 9677.5 9681.0 9678.0 9695.5 9693.5 9709.0 9706.5 9729.0 9727.5 9759.0 9756.5 9762.0 9759.5 9762.5 9760.5 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 9775.0 9777.5 9804.5 9806.0 9810.5 9821.5 9858.0 $ REMARKS: 9770.0 9772.5 9800.5 9804.0 9809.0 9822.0 9858.0 PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH2. OUT $ BP EXPLORATION B - 21 (12-31-11-14) PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 26 Tape File Start Depth = 9321.000000 Tape File End Depth = 9858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6451 datums Tape Subfile: 2 244 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES. Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9327.0 9828.0 9339.0 9836.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9321.0 9321.0 9331.5 9328.0 9335.5 9332.0 9338.5 9334.5 9348.0 9344.0 9356.0 9355.0 9363.5 9362.5 9369.0 9367.5 9371.0 9369.5 9373.5 9372.5 9371.5 9377.0 9375.0 9379.0 9380.5 9381.5 9383.5 9384.0 9385.0 9385.0 9384.5 9389.0 9388.5 9387.5 9396.0 9395.5 9396.5 9395.0 9399.0 9397.5 9399.5 9398.5 9404.5 9403.5 9405.5 9404.0 9404.0 9406.5 9404.5 9407.0 9405.5 9407.5 9406.0 9408.5 9407.5 9407.0 9409.5 9407.5 9411.0 9410.0 9409.0 9412.0 9410.5 9409.5 9412.5 9411.0 9413.0 9413.5 9411.5 9417.5 9422.5 9420.5 9424.0 9424.5 9423.5 9425.0 - EQUIVALENT UNSHIFTED DEPTH NPHI 9321.0 9410.0 9415.0 9421.0 9422.0 9423.0 9426.5 9427.0 9427.5 9428.0 9434.0 9435.5 9437.0 9438.5 9440.0 9441.0 9442.0 9445.0 9447.5 9448.0 9453.5 9454.5 9461.0 9461.5 9467.0 9472.0 9473.5 9474.0 9476.0 9478.0 9478.5 9479.5 9485.0 9489.5 9492.0 9494.0 9495.0 9498.5 9502.5 9505.0 9511.0 9517.5 9543.0 9545.0 9550.5 9560.0 9563.5 9564.0 9565.5 9566.0 9567.5 9569.0 9570.5 9571.5 9576.5 9577.5 9579.5 9580.0 9580.5 9584.5 9594.5 9600.0 9601.5 9602.5 9605.5 9606.5 9427.0 9434.5 9436.5 9438.0 9440.0 9440.5 9444.0 9446.5 9474.5 9478.0 9483.5 9488.0 9490.5 9492.5 9493.0 9501.0 9503.5 9509.5 9516.5 9549.0 9558.0 9565.5 9567.5 9569.0 9570.0 9583.0 9593.0 9598.0 9600.0 9605.5 9424.5 9425.5 9427.0 9433.0 9437.5 9445.0 9446.0 9451.5 9452.0 9458.5 9459.5 9465.0 9469.0 9470.5 9471.5 9475.5 9476.5 9496.5 9540.5 9542.5 9557.0 9560.5 9561.5 9563.0 9564.0 9574.5 9575.0 9576.0 9577.0 9577.5 9595.5 9598.0 9600.0 9608.5 9609.5 9611.5 9613.5 9614.5 9615.5 9617.5 9618.5 9619.0 9619.5 9622.0 9622.5 9624.0 9627.0 9639.5 9642.0 9643.0 9644.0 9651.0 9652.5 9653.0 9653.5 9658.5 9659.5 9660.0 9660.5 9661.0 9676.0 9678.0 9679.0 9679.5 9680.0 9680.5 9681.0 9681.5 9682.0 9682.5 9690.5 9691.5 9694.0 9703.0 9706.0 9707.0 9709.0 9710.0 9717.5 9723.5 9724.0 9725.0 9726.5 9733.0 9733.5 9734.5 9739.5 9740.5 9742.5 9743.0 9743.5 9744.0 9747.5 9607.5 9608.0 9611.0 9612.5 9613.5 9616.0 9616.5 9625.5 9640.0 9641.5 9651.0 9660.0 9673.5 9676.5 9677.0 9678.0 9679.0 9680.0 9687.5 9688.5 9691.5 9705.5 9717.5 9720.0 9720.5 9721.0 9722.5 9730.0 9736.5 9738.0 9741.0 9611.5 9616.0 9617.0 9619.5 9620.5 9622.0 9639.5 9644.0 9650.5 9652.0 9652.5 9657.5 9658.0 9658.5 9659.5 9677.0 9677.5 9678.0 9678.5 9679.0 9679.5 9701.0 9704.0 9704.5 9707.5 9732.0 9733.0 9740.0 9740.5 9741.5 9742.0 9745.0 9752.0 9752.5 9753.5 9754.5 9756.0 9757.0 9757.5 9763.0 9763.5 9770.5 9771.0 9771.5 9772.0 9775.0 9777.0 9780.5 9782.0 9788.0 9789.0 9791.5 9793.0 9795.5 9796.5 9804.5 9806.0 9806.5 9810.0 9815.5 9817.0 9820.0 9822.0 9825.0 9828.5 9830.5 9833.0 9833.5 9858.0 $ REMARKS: 9749.5 9750.5 9751.5 9752.0 9753.5 9754.5 9754.0 9755.5 9760.0 9760.5 9768.5 9766.5 9769.0 9769.5 9770.5 9770.0 9775.5 9780.0 9775.5 9787.5 9788.0 9784.5 9791.0 9792.5 9793.0 9795.5 9804.0 9800.5 9804.0 9806.0 9810.0 9815.0 9816.5 9819.0 9822.0 9825.5 9829.0 9831.0 9832.0 9833.5 9832.5 9858.0 9858.0 PASS 2. FUCT, NUCT, AND TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH3. OUT /??MATCH4. OUT $ : BP EXPLORATION : B - 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAP I 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 2O * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 26 Tape File Start Depth = 9321.000000 Tape File End Depth = 9858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6451 datums Tape Subfile: 3 254 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9328.0 9828.0 9341.0 9836.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9321.0 9321.0 9331.5 9329.0 9335.5 9333.0 9338.5 9336.5 9348.0 9346.0 9356.0 9355.0 9363.5 9362.5 9373.0 9372.0 9373.5 9373.0 9374.5 9374.5 9377.0 9375.5 9381.0 9381.0 9385.0 9383.0 9390.0 9390.0 9392.0 9392.0 9393.0 9392.5 9394.0 9392.5 9394.5 9393.0 9395.0 9394.5 9395.5 9395.0 9396.0 9395.5 9396.5 9395.5 9399.5 9398.5 9403.0 9402.0 9404.0 9402.5 9406.5 9405.5 9407.0 9405.5 9407.5 9406.0 9408.5 9407.5 9409.0 9410.5 9409.5 9411.0 9411.5 9410.0 9412.5 9413.5 9412.0 9414.5 9412.5 9415.0 9413.5 EQUIVALENT UNSHIFTED DEPTH -- NPHI 9321.0 9407.0 9409.0 9409.5 9417.5 9419.0 9420.0 9422.0 9422.5 9423.0 9424.5 9425.0 9426.0 9427.0 9427.5 9428.0 9431.5 9433.0 9434.5 9441.5 9445.0 9446.0 9448.0 9449.0 9461 .'0 9461.5 9462.5 9463.5 9465.5 9466.5 9473.0 9476.0 9485.0 9489.0 9489.5 9495.0 9497.0 9497.5 9498.5 9502.0 9509.5 9511.0 9511.5 9513.0 9514.0 9514.5 9517.0 9518.5 9527.5 9535.0 9537.0 9537.5 9538.5 9556.0 9562.5 9563.5 9565.5 9571.5 9575.5 9576.0 9578.0 9579.5 9580.0 9580.5 9417.5 9418.0 9421.0 9424.0 9425.5 9431.5 9433.5 9444.0 9444.5 9446.5 9465.5 9474.5 9483.5 9488.0 9493.5 9496.0 9496.5 9497.0 9501.0 9508.5 9509.5 9511.0 9512.5 9516.5 9518.5 9533.5 9535.0 9537.5 9554.5 9560.5 9563.5 9570.0 9574.0 9578.5 9579.5 9415.0 9419.0 9420.0 9422.0 9423.0 9425.0 9426.0 9427.0 9430.5 9434.0 9439.5 9446.0 9446.5 9458.5 9459.5 9460.5 9461.0 9463.0 9471.0 9487.0 9488.0 9496.0 9509.5 9512.5 9525.0 9535.0 9561.5 9574.0 9575.0 9575.5 9582.5 9584.5 9589.0 9590.0 9594.5 9597.0 9599.5 9601.5 9606.0 9606.5 9608.5 9609.5 9611.5 9614.0 9616.0 9617.5 9618.0 9618.5 9619.0 9620.0 9620.5 9621.0 9622.0 9622.5 9624.0 9627.0 9629.0 9638.0 9639.0 9641.0 9642.0 9643.0 9643.5 9644.5 9651.5 9652.5 9660.5 9661.0 9661.5 9663.0 9672.0 9674.0 9676.0 9676.5 9677.5 9679.0 9680.0 9692.0 9694.0 9695.5 9703.5 9708.0 9708.5 9709.0 9710.0 9710.5 9713.0 9717.5 9718.0 9722.5 9583.5 9588.5 9593.0 9600.0 9604.5 9605.5 9607.5 9608.0 9610.5 9612.5 9614.5 9616.5 9617.0 9618.0 9619.5 9625.5 9627.5 9636.5 9641.5 9651.0 9660.0 9661.5 9670.5 9672.0 9676.5 9677.0 9689.5 9691.5 9693.0 9708.5 9713.0 9717.5 9578.0 9584.5 9592.0 9594.5 9598.0 9615.5 9616.5 9617.5 9618.5 9619.0 9619.5 9620.5 9622.0 9639.5 9641.5 9642.0 9643.5 9644.0 9650.5 9659.5 9660.0 9675.5 9676.0 9676.5 9701.0 9705.5 9706.5 9707.0 9707.5 9708.0 9715.5 9720.5 9727.0 9730.0 9735.5 9736.5 9738.0 9738.5 9739.0 9740.5 9741.0 9742.0 9743.5 9750.0 9756.0 9757.0 9758.0 9758.5 9764.0 9765.0 9768.5 9769.0 9769.5 9770.5 9771.0 9775.0 9777.5 9780.0 9782.0 9786.5 9791.5 9795.5 9802.5 9805.0 9806.0 9811.5 9817.0 9820.0 9821.5 9823.5 9825.5 9829.0 9830.5 9833.0 9833.5 9835.0 9858.0 $ REMARKS: 9724.5 9729.0 9733.5 9734.0 9735.5 9736.5 9737.5 9737.5 9738.5 9740.5 9741.5 9748.0 9754.0 9754.5 9755.5 9756.5 9761.5 9762.0 9766.5 9767.0 9767.5 9768.5 9769.5 9773.5 9770.5 9776.0 9779.5 9781.5 9786.0 9791.0 9793.5 9802.5 9804.5 9806.0 9814.0 9815.0 9820.5 9820.5 9822.5 9825.0 9828.0 9830.5 9832.0 9832.5 9835.5 9858.0 9858.0 PASS 3. FUCT, NUCT, AND TENS WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH5. OUT /??MATCH6. OUT $ : BP EXPLORATION : B- 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) Total Data Records: 26 1014 BYTES * Tape File Start Depth = 9321.000000 Tape File End Depth = 9858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12902 datums Tape Subfile: 4 262 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, AND NUCT WERE AVERAGED FOR ALL THREE PASSES. $ : BP EXPLORATION : B- 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 2 NPHI CNAV 68 1 PU-S 3 FUCT CNAV 68 1 CPS 4 NUCT CNAV 68 1 CPS 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 1 4 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 22 Tape File Start Depth = 9321.000000 Tape File End Depth = 9858.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11827 datums Tape Subfile: 5 45 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9328.0 2418 9338.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9840.5 9848.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 01-MAY-94 FSYS REV. J001 VER. 1.1 910 01-MAY-94 9846.0 9841.0 9350.0 9840.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA .000 10198.0 .0 PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION : B- 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 ~4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 85 Tape File Start Depth = 9327.000000 Tape File End Depth = 9856.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34073 datums Tape Subfile: 6 Minimum record length: Maximum record length: 160 records... 62 bytes 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9322.0 2418 9335.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9842.0 9850.0 01-MAY-94 FSYS REV. J001 VER. 1.1 943 01-MAY-94 9846.0 9841.0 9350.0 9840.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): .0OO 10198.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX' · MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION : B- 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-S 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 86 Tape File Start Depth = 9322.000000 Tape File End Depth = 9858.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 33278 datums Tape Subfile: 7 Minimum record length: Maximum record length: 161 records... 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9321.0 2418 9336.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9841.0 9850.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 01-MAY-94 FSYS REV. J001 VER. 1.1 1013 01-MAY-94 9846.0 9841.0 9350.0 9840.0 1200.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 12323XA .OO0 10198.0 .0 PRODUCED FLUIDS .00 .0 .0 0 .0 .000 .000 .000 .0 THERMAL SANDSTONE .00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS) : 50 NEAR COUNT RATE HIGH SCALE (CPS) : 1050 TOOL STANDOFF (IN): .0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION : B- 21 (12-31-11-14) : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 86 Tape File Start Depth = 9321.000000 Tape File End Depth = 9857.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55524 datums Tape Subfile: 8 161 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 9 is type: LIS 94/ 5/11 01 **** REEL TRAILER **** 94/ 5/11 01 .Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 11 MAY 94 8:51a Elapsed execution time = 22.52 seconds. SYSTEM RETURN CODE = 0 B -21 PRUDHOE BAY ._ n · · · · · · · · ! · RECEIVED APR I 7 1995 ATLAS oil & Gas cons. ¢ommissiocdktla. s Wirdine Services Anchorage Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0 ) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD B - 21 500292085000 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 05-APR-95 5718.07 J. DAHL T. STAGG 31 llN 14E 674 1896 79.75 78.46 36.60 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9358.0 47.00 7.000 10198.0 26.00 5.500 9019.0 17.00 4.500 9178.0 12.60 BASELINE DEPTH 9374.0 9385.0 9389.5 9394.0 9395.0 9406.0 9407.0 9412.5 9413.5 9423.5 9424.0 9446.5 9450.5 EQUIVALENT UNSHIFTED DEPTH BHCS GR 2 1 26-NOV-82 SWS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: GRCH 9372.5 9384.0 9388.5 9393.0 9393.5 9404.5 9405.0 9410.5 9411.0 9421.0 9422.0 9444.5 9448.0 9453.0 9472.0 9490.0 9502.5 9511.0 9515.5 9535.0 9562.0 9571.5 9618.0 9618.5 9630.0 9631.5 9646.5 9653.0 9661.5 $ REMARKS: 9450.5 9470.0 9487.5 9501.0 9509.0 9514.5 9533.0 9560.0 9569.0 9615.5 9616.5 9628.0 9629.0 9644.0 9651.0 9659.5 CN/GR Cased Hole. LOG TIED INTO BHC/AL, 11-DEC-82 (WALS). WELL TEST SUMMARY TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NET WATER RATE FORMATION GASRATE LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE 24-MAR-95 HOURS 2.0 MPBD 4.76 MBOPD 0.55 MBWPD 4.21 MMSCFD 8.91 SCF/STB 16115 MMSCFD 0.00 PSIG 0 SCF/STB 16115 SCF/BBL 1870 57.1 PSIG 960 177 88.4 MANIFOLD TEMPERATURE DEGF WATER CUT (CALC) PCNT NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CASING CORRECTIONS OFF, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 9350.0 2418 9350.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i BASELINE DEPTH NPHI 9375.5 9373.0 9379.5 9377.5 9385.0 9384.0 9389.5 9388.5 9393.0 9392.5 9406.0 9404.5 9407.0 9405.0 9412.5 9410.5 9413.5 9411.0 9423.5 9421.0 9424.0 9422.0 9436.0 9434.0 9447.5 9444.0 9453.5 9450.0 9455.5 9452.5 9467.0 9464.5 9472.0 9470.0 9490.0 9487.5 9502.5 9501.0 9511.0 9509.0 9515.5 9514.5 9518.0 9516.5 9535.0 9533.0 9562.0 9560.0 9571.5 9569.0 9594.5 9592.5 9610.0 9607.0 9618.0 9615.5 9618.5 9616.5 9627.0 9624.5 9630.0 9628.0 9631.5 9629.0 9641.0 9639.0 9643.0 9641.5 9647.0 9646.0 9653.0 9652.5 9661.5 9659.5 $ for each run in separate files. STOP DEPTH 9668.0 9683.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH REMARKS PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B. OUT $ : BP EXPLORATION (ALASKA) : B- 21 : pRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 16 * DATA RECORD (TYPE~ 0) 1006 BYTES * Total Data Records: 15 Tape File Start Depth = 9700.000000 Tape File End Depth = '9340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3606 datums Tape Subfile: 2 200 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: i START DEPTH STOP DEPTH 9350.0 9668.0 9350.0 9683.0 BASELINE DEPTH GRCH 9350.5 9350.0 9354.5 9354.0 9355.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... NPHI 9358.0 9357.0 9361.5 9360.5 9379.5 9379.0 9382.0 9382.0 9393.0 9391.5 9394.5 9393.0 9398.5 9402.0 9407.0 9405.5 9408.5 9409.5 9407.0 9426.5 9491.5 9492.0 9500.0 9509.0 9517.0 9427.0 9429.0 9430.0 9436.5 9439.5 9445.5 9446.5 9449.0 9450.0 9452.0 9464.5 9466.0 9473.0 9484.5 9494.0 9495.0 9496.0 9502.0 9503.0 9511.0 9518.0 9518.5 9354.0 9374.0 9397.5 9401.0 9406.5 9407.0 9424.0 9425.0 9427.0 9427.5 9434.0 9436.5 9442.5 9443.0 9445.5 9446.0 9448.5 9461.5 9463.0 9470.5 9482.0 9494.0 9501.0 9517.0 9519.0 9535.0 9536 .'0 9536.5 9545.0 9559.0 9562.5 9570.5 9575.5 9577.5 9580.0 9581.5 9582.5 9583.5 9585.5 9593.5 9594.0 9596.0 9615.5 9617.5 9621.0 9621.5 9627.0 9630.0 9631.0 9633.0 9634.0 9639.5 9643.0 9645.0 9646.0 9650.5 9653.0 9653.5 9659.0 9664.5 9677.0 $ REMARKS: 9533.5 9556.0 9560.5 9568.0 9573.0 9577.0 9580.5 9591.5 9615.0 9618.5 9619.5 9624.5 9628.0 9628.5 9630.5 9631.0 9640.0 9641.5 9642.5 9651.0 9657.5 9663.0 9517.5 9534.0 9534.5 9542.5 9568.0 9576.0 9580.0 9580.5 9583.5 9591.0 9594.0 9613.0 9637.0 9650.0 9653.0 9675.0 PASS 2. FUCT & NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH2A. OUT /??MATCH2B. OUT $ CN : BP EXPLORATION WN : B - 21 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F (ALASKA) 4 Curves: Name Tool Code Samples Units API API API API .Log Crv Crv Size Length Typ Typ Cls Mod i GRCH 2418 68 i GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 15 Tape File Start Depth = 9700.000000 Tape File End Depth = 9340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3606 datums Tape Subfile: 3 123 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START-DEPTH STOP DEPTH 9350.0 9668.0 9350.0 9683.0 BASELINE DEPTH GRCH 9353.5 9352.0 9355.0 9357.0 9356.5 9378.0 9377.5 9379.5 9384.5 9383.0 9390.0 9389.0 9393.5 9396.5 9397.5 9399.5 9398.5 9404.0 9403.5 9404.5 9409.5 9407.5 9412.5 9410.5 9414.5 9412.5 9420.5 9418.5 9423.5 9425.0 9424.0 9428.5 9435.5 9434.0 9436.0 9436.5 9434.5 9437.0 9435.5 9439.0 9442.5 9446.0 9444.5 9447.0 9445.0 9447.5 9446.0 9448.0 9448.5 9447.0 9451.0 9451.5 9449.5 9457.0 9465.5 9471.5 9481.0 9479.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 9354.0 9377.5 9393.0 9396.0 9396.5 9403.5 9407.5 9421.5 9426.5 9434.0 9436.5 9440.0 9445.0 9447.5 9455.0 9463.0 9469.5 9482.0 9483.0 9484.0 9485.5 9494.0 9494.5 9502.0 9508.0 9517.0 9517.5 9535.5 9537.5 9565.5 9602.0 9603.0 9603.5 9608.0 9611.0 9615.5 9617.0 9618.5 9619.5 9621.5 9623.0 9631.5 9634.0 9635.5 9638.5 9641.0 9647.0 9648.0 9653.0 9653.5 9657.0 9658.5 9660.0 9661.0 9666.5 9676.0 9676.5 $ REMARKS' . 9479. 9480. 9482. 9492. 9493. 9506. 9516. 9533. 9563.5 9600.0 9600.5 9601.0 9605.0 9609.0 9616.5 9617.0 9620.0 9630.0 9631.5 9633.0 9636.0 9644.5 9651.5' 9656.0 9659.5 9483.5 9501.0 9516.5 9536.0 9614.0 9615.0 9621.0 9640.5 9648.0 9653.5 9657.5 9659.0 9659.5 9665.0 9675.0 9676.0 PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT * FORMAT RECORD / ? ?MATCH3A. OUT / ? ?MATCH3 B. OUT $ : BP EXPLORATION (ALASKA) : B- 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves'. Name Tool Code Samples Units 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS * DATA RECORD (TYPES 0 ) Total Data Records: 15 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 16 1006 BYTES * Tape File Start Depth = 9700.000000 Tape File End Depth = 9340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7212 datums Tape Subfile: 4 Minimum record length: Maximum reCord length-. 126 records... 62 bytes 1006 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : B - 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units 1 GRCH CNAV 68 1 GAPI 2 NPHI CNAV 68 1 PU-S 3 FUCT CNAV 68 1 CPS 4 NUCT CNAV 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) Total Data Records: 15 1006 BYTES * Tape File Start Depth = 9700.000000 Tape File End Depth = 9340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIs representation Code decoding summary: Rep Code: 68 7212 datums Tape Subfile: 5 38 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9344.0 2418 9344.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9678.0 9693.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 03-APR-95 FSYS REV. J001 VER. 1.1 1044 03-APR-95 9680.0 9685.0 9350.0 9683.0 1500.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA 0.000 10198.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0. 000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE~ COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 3 FAR COUNT RATE HIGH SCALE (CPS): 403 NEAR COUNTRATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS $ CN WN FN COUN STAT BP EXPLORATION (ALASKA) : B- 21 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 2 CNC 2418 68 3 CN 2418 68 1 4 LSN 2418 68 5 SSN 2418 68 1 6 CCL 2418 68 1 7 SPD 2418 68 1 8 TEN 2418 68 1 GAPI PU-S PU-L CPS CPS F/MN LB 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 32 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 51 Tape File Start Depth = 9696.000000 Tape File End Depth = 9344.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19894 datums Tape Subfile: 6 126 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9343.0 2418 9343.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9677.0 9692.0 03-APR-95 FSYS REV. J001 VER. 1.1 1102 03-APR-95 9680.0 9685.0 9350.0 9683.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10198.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 3 FAR COUNT RATE HIGH SCALE (CPS): 403 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : B - 21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod I GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 32 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 51 Tape File Start Depth = 9695.000000 Tape File End Depth = 9343.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19894 datums Tape Subfile: 7 126 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NI/MBER: 7 RAW CURVES Curves and l°g header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9343.0 2418 9343.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9677.0 9692.0 03-APR-95 FSYS REV. J001 VER. 1.1 1121 03-APR-95 9680.0 9685.0 9350.0 9683.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8220XA 2418XA BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10198.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMALOR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 3 FAR COUNT RATE HIGH SCALE (CPS) : 403 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :B-21 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod i GR 2418 68 i GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 i F/MN 4 8 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 32 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 51 Tape File Start Depth = 9695.000000 Tape File End Depth = 9343.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32576 datums Tape Subfile: 8 126 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS 95/ 4/ 5 01 **** REEL TRAILER **** 95/ 4/ 5 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 5 APR 95 2:33p Elapsed execution time = 5.66 seconds. SYSTEM RETURN CODE = 0