Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
183-007
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS (S i✓.rm Vu..i Asn � V Eaa roti" 1. Operations Performed Zu I I Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program Y❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other: Set Straddle Packers 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number 183-007 3. Address: P.O. Box 198612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-20896-00-00 7. Property Designation (Lease Number): ADL 028284 8. Well Name and Number. PBU H-20 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10330 feet Plugs measured None feet true vertical 9242 feet Junk measured 10044, 10090 feet Effective Depth: measured 10126 feet Packer measured 8868. 9011 feet true vertical 9062 feet Packer true vertical 7969, 8094 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 2V'x 30" 41 -121 41-121 Surface 2652 13-3/8" 41-2692 41-2692 5380 2670 Intermediate 9419 9-5/8" 38-9457 38-8476 6870 4760 Liner 1106 7" 9224-10330 8277-9242 7240 5410 Liner 1166 4-1/2" 9056-10222 8132-9147 8430 7500 Perforation Depth: Measured depth: 9770-10098 feet True vertical depth: 8749-9037 feet Tubing (size, grace, measured and true vertical depth) 5-1/2" 17# x 4-1/2" 12.6#, 13Cr80 36-9072 36-8146 Packers and SSSV (type, measured and 5-1/2" Baker S-3 Packer 8868 7969 true vertical depth) 5-1/7 Baker S-3 Packer 9011 8094 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 666 41424 352 0 1984 Subsequent to operation: 489 23946 312 0 1794 14.Attachments: treeared per 20 MC 2507025.071. s2s.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WIN) ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name. Wellman, Julie _ Contact Name: Wellman, Julie rI Authorized Title: Production Engine \ Contact Email: Julie.WellmanAtip.com Authorized Signature:. a tJJVr" �` .,� C te: , 'yr�� �' Contact Phone: +1 9075644657 Form 10.404 Revised 04/2017--* #1 4 7 r-wRt6AW49 (.,)F Del MaUC 0 7 261Submit Original Only Daily Report of Well Operations PBU H-20 ACTIVITVnATF CI 1MMARY CTU #9 1.75" coil 0.156 WT Objective: Fish Patch Mobilize to location. MIRU. Grease crew had to come out and service SSV. Rig up complete, make up fishing BHA with 3.13" jars and 4" GS Spear. RIH and load well with 1% KCI w/ Safe Lube. RIH to patch and pull after 12 jar licks. POOH. Lay down patch and discover lower packer sub, elements, slips, and slip cage were all left in hole. RDMO CTU. 10/17/2018 `In progress*** CTU #91.75" coil 0.156WT Objective: Fish Patch Rig down 10/18/2018 ***Job Complete*** ****WELL S/I UPON ARRIVAL"" (Profile modification) R/U SLICKLINE UNIT SWCP #4522 FOR DRIFT / CALIPER 10/26/2018 ****CONT JOB ON 10/27/18**** ****CONT. JOB FROM 10/26/18**** (Profile modification) DRIFTED W/ 3.70" CENT, XN LOC, 2-1/2" S -BAILER, TAG TO @ 10,082' SLM DRIFTED W/ 38.6' 45KB STRADDLE PATCH DRIFT TO TO @ 10,093' SLM (No issues) RAN PDS 40 ARM CALIPER LOG FROM 10,079' TO 8,800' SLM (Good data) 10/27/2018 ****WELL LEFT SA & PAD -OP NOTIFIED OF STATUS UPON DEPARTURE**** ***WELL SHUT-IN ON ARRIVAL*** (SLB E -LINE PATCH SETTING) INITIAL TWO = 2500/900/0 PSI RIG UP, PT LUBRICATOR. RUN 1: RIH W/ 4-1/2" BKR PATCH 22' ELEMENT TO ELEMENT ONE TRIP PATCH. SET PATCH OVER INTERVAL = 100116- 10037'. RUN 2: RIH W/ 4-1/2" BKR 30' ELEMENT TO ELEMENT ONE TRIP PATCH. SET PATCH OVER INTERVAL = 9766'- 9796'. RDMO. ALL PASSES TIED INTO SCHLUMBERGER PERFORATION RECORD DATED 03 -APR -2014. FINIAL T/I/O = 2375/950/0 PSI. 11/6/2018 ***JOB COMPLETE, WELL LEFT SHUT-IN ON DEPARTURE*** irec= �wrr -:-� h13LJfAD= CNV \CTUATOR=OTIS SHOT OKB. AEN _W7 80.7 3F. E" = 45.05. (OP= 3060' MBz Angle = 36' 64-166 --9919' )alum MD= 9785-9794 )atum TVD= 8800'SS 20" COPDl1CTOR IYD563,ID=8.681" 2078' BOW43N PATCH 2153' - 2157' RTRS ID = 12 347" 1 Minimum ID = 3.725" @ —9032' 4-1/2" HES XN NIPPLE 5-12" TBG, 17#, 13CR-80 VAM TOPHC, 8949' .0232 bpf, D = 4 892" 5-1/2" TBG STUB (0827/08)8956' 5-117 TBG, 17#, 13CR-80 VAMACE NSCf, 8999' 0232 bpf, D = 4.892' -72 TT ASSEMBLY DROPPED 6' �11(c (SEE SAFETY NOTE) /J.e1U 4-12" TBG, 1264" 2 6#, 13CR-80 NSCT, 9060' .RTI 0 -0152 bpf, D = 3.958" 35/8' CSG, 47#, L-80 BTRS, D = 8.681' H 9457' PEiFORATON SLhW ARY Fill LOG: SVVSBFICS ON 02/10/83 ANGLEATTOPPERP: 28° @ 9770' Note: Refer to Production DB for historical perf data SLZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8" 6 9770-9779 O 04/03/14 DATE 2-7/8' 6 9785-9794 0 04/03/14 MMG MMG MMG 3-38" 4 9800 - 9812 S 04/06193 05/07/93 3-318" 4 9944- 10032 S 1224/84 10/10/86 2-718" 6 10022- 10032 O 10/12/02 3-18" 4 10044 - 10098 S 1224184 10/10/86 2-12" 5 10060-10075 O 03/14/03 2-78" 6 10075 - 10098 O 10/12/02 2-12" 5 10079 - 10098 O 03/14/03 xX/V HIM:i) BY PApfU 41/2" TBG, 12.6#, , .0152 bpf, D= 3.958' 10210' 7" LNR 26#, L-80, .0383 bpf, D = 6.276" 10330' SAFETY NOTES "5-12- AND 4-12' CHROME H-20 TBG"' TBG PARTED- DROPPED W PER EXPRO VIDEO LOG (0322111) R2081't5-1 HES X PID, D = 4.562" HES CEMENTER W PI(R GAS LFT MANDRELS —j W�8840' -� 5-1/2" FES X NP, D = 4562" —� 8861' H 9-5/8' X 5-12" BKR S-3 PKR D = 4.75' 9032' 8886' ST MD TVD DEV TYPE I VLV I LATCH PORT DATE 01107/12 RK SET STRADDLE PATCH (1012) 3 2 1 3539 5972 7744 3513 5519 6987 23 35 30 MMG MMG MMG DOME SO OMY w TRK w 16 20 0 09/16/08 09/16/08 09/03/08 —j W�8840' -� 5-1/2" FES X NP, D = 4562" —� 8861' H 9-5/8' X 5-12" BKR S-3 PKR D = 4.75' 9032' 8886' 5-1/2- HES X NP, D = 4.562" 8964' 9-5/8" UNIQUE OV EdSHOT 8978' S 12" HES XN NP, D = 4.455" 09104108 DI4 RWO 7" BKR TACK SLEEV E, D = 7.500" 9pTU I-1 t, - 1/z X4 -W- XU, D=3.8N- TBG TAIL 9032' 4-12" HES X W. D = 3.813' OfiOPP[D 6' DATE REV BY COMMENTS Prix rxPRo 9053' 4-12" OTB XN NIP, D = 3 725" LOG (03122117 CJW.NMD SET EVO-1T3IEVE PLUG w/JUN(CATCHER 09104108 DI4 RWO 7" BKR TACK SLEEV E, D = 7.500" 12/17/11 LEC/ PJC PARTED TBG (11/18/11) 11080/18 JCF/JAO PULLED STRADDLE PATCH 8 SET FISH 1 9052' 35/8" X 7" ZXP LTP w /MAC HGR D = 6.280" 9066' 4-12" WLEC, D=3.958" (REF B(FR0 LOG W211 1) 9054' ELMO VYLEG(10/12/02) 9066' 7' X 4-12' XO, D = 3.940" ELEMENTS, SLIPS FRUDHOE BAY UNIT WELL: 1420 M PERMIT No: 9830070 AR No: 50-029-20896-00 SEC 21, T11 N, RBF, 480' FN_ B 1736 FEL DATE REV BY COMMENTS 11 DATE REV BY COMMENTS 12124/84 AUX 3 ORIGINAL COMPLETION 04/09/14 GW/.BMD ADPERFS (04/03114) 08119102 N28E RIND 1102101117 CJW.NMD SET EVO-1T3IEVE PLUG w/JUN(CATCHER 09104108 DI4 RWO 03/14/17 ZV/JkD PULLED PLUG w /JUN( CATCHER (3/13117) 12/17/11 LEC/ PJC PARTED TBG (11/18/11) 11080/18 JCF/JAO PULLED STRADDLE PATCH 8 SET FISH 01107/12 RK SET STRADDLE PATCH (1012) BP Exploration (Alaska) 01/09/12 TM—PJC RSH- PATCH GLIDE SHOE 11 I TREE= CNV WELLHEAD= CNV ACTLATOR= OTIS OKB. BP/ = 802 BE. EF/ = 45.05 KOP= 3OW Max Angle = 36' @ 4100 Datum MD= 9919 Datum ND= SBOO SS K.IKkO D "IA ,. le .. n 2103- -zip, 113-3t8' Z10I13-3/8' CSG, 7211, L -SO BTRS, D =12.347' 2892' Minimum ID = 2.35" @ 9764' TOP OF 45KB PATCH S72' TBG, 17#, 13CR-80 VAM TOP HC,, .0232 bpf, D = 4.892' 5112' TBG STUB (08271081 D=4.892' TT ASSEMBLY DROPPED 6' (SEE SAFETY NOTE) -12' TBG, 12.8#, 13CR: 80 NSCT, 1152 bpf, D = 3.958- 9-5/8' CSG, 47#, L-80 BTRS, D = 8.681' PERFORATION SLAWARY REF LOG: SAS-BFCS ON 02/1083 ANGLEATTOPf$RF:28" tQ 9770' Note: Refer to Production DB for historical pert data SIZE SPF I INTERVAL Opn/SW SHOT SOZ 2-78' 6 9770-9779 C 04/03/14 DOME 2-7/8• 6 9785-9794 C 04/03114 5972 5519 3-38' 4 9800 - 9812 S 04/06/93 05/0783 3-38' 4 9944-10032 S 1224/8410/10/86 RK 2-78' 6 10071- 10032 C 10/12(02 3-18' 4 10044 - 10098 S 12/24/84 10/10/86 2-12' 5 10060 - 10075 O 03/14/03 2-78' 6 10075 - 10098 O 10/12102 2-12' 5 10079 - 10098 O 03/14/03 Y LHR, 12.6#, L-80, .0152 bpf, D = 3.958'1021 W 7' LW 26#, L-80, .0383 bpf, D = 6276' 10330' ROME H-20 SAFETY TBG*** TBG PARTED- DROPPED 6 PER EXPRO VIDEO LOG (03122111) 2081' 5-1/2' FES X NP, D = 4.562' 2134' I -L9-5/6' �P 2940' &518' DV PKR GAS LFT MANDRELS ST MD TVD DEV TYPE I VLV I LATCH PORT DATE 3 3539 3513 23 MMG DOME RK 16 09/16/08 2 5972 5519 35 MMG SO RK 20 09/16/08 1 7744 6987 30 MMG DMY RK 0 09/03/08 8861' H 9-5/8' X 5-12' BKR S-3 PKR, 0=475- 1 =475' 1 8886' H5-72'I-ESXNP.D=4.562' I UNOLB OVERSHOT HES XN NP. D = 4.455' TBG TAIL DROPPED F PER EXPRD LOG (03122J11 9044' H 7- BKR TEBACK SLEEV E, D = 7.500' 9062' 9-5/8-X7-ZXPLTPw/FMC GR,D=6.280' 9066' 4-12' WLEG, D=3.958' 09/04/08 D14 RVJO (REF DG:R0 LOG 3/22111) 9064' BMDv%H-(10/12/02) DATE REV BY CohaIENIS DATE REV BY COMUE4TS 122484 AUDI 3 ORIGINAL COM PLEIION 10/30/18 JCHJMJ p 1 1 IT1 STPADDLE PATCH &SET FISH 0811982 N28E RIND 1129/18 DdJMD ADDED CDND DEPTH 8 CORRECTED LNR 09/04/08 D14 RVJO 1129118 J SEr TWO 45KB PATCHES (11/06/18) 04/09/14 GW/JbD ADPERFS(04/03/14) 03/19/19 1 BTNJ&q DEPTH CORRECTION TO BOTTOM HATCH 02/01/17 CJWJND SET EVO-TR12VE FiIJG w IJUW CATCHER PRONG 03/14/17 ZV/JMJ PLLLED PLUG w /JON( CATCHER (3/13/17) (10/17/18) PRUDHOE BAY LUT WELL: K20 PERMIT ND: 9830070 AH No: 50-029-2089600 T11 P!, R13E, 480' FPL 81736' FEL BP Exploration (Alaska) STATE OF ALASKA • • •ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull Plug IZ 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 183-007 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20896-00-00 7. Property Designation(Lease Number): ADL 0028284 8. Well Name and Number: PRUDHOE BAY UNIT H-20 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED C E I V E Total Depth: measured 10330 feet Plugs measured feet G G y true vertical 9242 feet Junk measured 10090 feet MAR 3 0 2017 Effective Depth: measured 10126 feet Packer measured See Attachment feet ^ true vertical 9062 feet Packer true vertical See Attachment feet AOGC J Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 41-121 41-121 Surface 2651 13-3/8"72#L-80 39-2690 39-2690 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): t4$Et M', 1 5'817, Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 614 38362 4 860 1438 Subsequent to operation: 1164 49654 260 740 1670 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations li1 Exploratory 0 Development IA Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ ❑ WAG 0 GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 3/30/17 Form 10-404 Revised 5/2015 ///,17 I/477- 57/0/./JJ 7 RBDMS { k/ A.:1 - 3 2017 Submit Original Only • Packers and SSV's Attachment PRUDHOE BAY UNIT H-20 SW Name Type MD TVD Depscription H-20 PACKER 2137.72 2137.7 9-5/8" BOT External CSG PKR H-20 TBG PACKER 8864.74 7966.26 5-1/2" Baker S-3 Packer H-20 TBG PACKER 9007.99 8091.06 5-1/2" Baker S-3 Packer H-20 PACKER 9060.39 8136.38 4-1/2" Baker ZXP Packer • • a) a o 0 0 0 0 0 ro 0 0 � cocoo � � ooao0 — O c N N U 'co o 0 0 0 0 0 0 0 0 Nr 03 O) CO 00 N1' N ti m (r) CO CO t- I— CO O CO N O O LO N O) Cr) Nr O) IC) 0) Nr CO r- A— N O) 0 0 v- N N CO O) 03 CO CO CO CO = Or- O) O) Lo - C3) 00 CO C) N- LO CO CA • C'7 Ch •- N CS) CO O O N 00 CO CO CO CO = CD N CD A— N- 0 C) �t N- CO O) C No) co toE N M O cm co co - N N 6) O O O CO O) 0) V I i i i i I I i as �▪ + CS) Q `— Cr) O 03 ✓ CA CO CO LO N CO Lo D CO Cr) r- O N Cr) CS) O =QQ N O) CS) CO CA • CO• W H 0 O O O � 00 co co O � � co Cr)Q _ J J J J M J J C NcoN *k *kCp -I *kCp N � � � *k � N X N. 24" V N— CSO OcNi CU a O 00 E _ N = _N QO _ U M N CV N Nr LC) .c +' co C.O Co CO �— ca co to N (3) COO C!) co Nr O 00 (.0 a— N CO 0) LO Lc) J N N CO W W Q Q C W o W W U L.L. Ct CC CC C Z Z Z ZWZ WWWWWmmm ODI— F- zzz > > > U) Z Z J J F— • • a) N f6 v- v- mN 0 CO O cr N CO O LO M t w In ti CO O CC) N- N- O v— N M O N- ti N- O) O) 6) O) O O O O p CO cO O 00 0O CO OO O) CA O) O r Q O CO d- N- — N M CO CO t CV M U) O) CO O I- N- 00 O Cf) Cl O N Cn O) O O) M N- O ❑ N O ti O O Cn ti 00 O .— N w O CO N- N- M CA O) O) CA O O O p co OO co co Cb 00 aO CA O) O 0 2 w ❑ aa � w w w 0 w ❑ F- 0 w g g Y 00 0 CO 0 0 Cncn W Y Y r 0 O Z O) v N N- O N N O Cn CA a0 J Q Q u)° Ow I LLJ N M CO N- N- O) J J J Cn w D' 4.".411. N. 0"- .1- 84000 (0C1010 Q Q < w - d C o N. N. CD C) 6 C) 6 6 C) C) 0 0 0 w w J y r .- Z Z Z 0 O 0 a J E 000 W p ❑ Z H ❑ t w w 0_ F.- H < J < 2 2 2 O cn cn cn cn cn co Q4419-a C m = Oc0C) NrnNVOLorn O a N0000 _ oo0000 W o N- N000) a' OOOOOO CS) rn cn rn rn COOca • Z 2 2 0 co cn co cn Cl) O- a 0 0 4• 1LL_ NNaaaaaaa ioaa00aaaaaaa tQ ¢ cncnmmmmmmm Q 0 a) a) a m H R N- ❑ c 0 0 0 0 0 0 0 0 0 0 0 w o N N N N N w N N N N N N Z LU Q w M M 000 M M M M M M M g w ❑ J ❑ w CLLL d M N Z a J w w LL w O wW Q Q CL Cn E E 1i¢ W CL CC a) 0 to Z 0 0 0 0 0 0 0 0 0 0 0 m N N N N N N N N N N N COO- a s UU J O NO w a 22222 = 222 = 2 < < m m w v) U a • • 0 2 F- a) ci Ili" © 7 WN > W_ o N H - O > W oti W N I N — a) ,- U c0 a) E a o•• o cNi w • _o E p ' < LL • -0 — .0 E a) L• = C7 ° cn n /) Q- ~ D O W Q) ate) 0 O Zcn w a) rn a L ^ 5 LL � O ° O Qa) c LL OZ ci 2 a * O O O m ti» ° u) LCL cp W wQ :.=0 w to p O D * > > • = QCT * mow * w 0cc m « w cunt, w > a Q- w > c`' O1- a > _ rwQ as O ct Q U M = w o ZZ O - Z O Z O w N O (A WZvw J o . Z 1 o J ww ,_- O Z J Z U J 0 * DEO * D a) 0_ .92-0 : a : o w I— Q r- N- o >- o o ° H N N E > N C) m 1— hcM U Q TREE=. CNV III • WD_LHEAD= CM, SAFETY NOTES.'"'5-1/2"AND 4-112"CHROME ACTUATOR= OTIS H-2 O TBG"TBG PARTED-DROPPED 6'PER EXPRO CMB.ELEV= 80.2' VIDEO LOG(03/22/11) BF.ELEV= 45.05' II 4,i ■ • 1 KOP= 3000' vs* ,+ 2081' H5-1/2"HES X NP,D=4.562" Mix Angle= 36°@ 4100' 20"CONDUCTOR H ? �/ 1�1' I 1� Datum MD= 9919' i s, Ot �� � 2121' --I9-5/8"FES CHANTER Datum ND= 8800'SS (ASA �� 2134' --I9-5/8"ECP 9-5/8"CSG,47#,L-80 HYD 563,13=8.681" H 2078' f,•.• •� 9-5/8"BOWEN PATCH H 2640' —9-5/8"DV PKR 2153'-2157' , 13-3/8"CSG,72#,L-80 BTRS,ID=12.347" H 2692' GAS LIFT MANDR ST MD TVD DEV TYPE V LV LATCH PORT DATE LI 3 3539 3513 23 MMG DOME RK 16 09/16/08 2 5972 5519 35 MMG SO RK 20 09/16/08 1 7744 6987 30 MMG MY FX 0 09/03/08 Minimum ID =2.45" § 10009' • H5 1r2"HES X NP,D=4.562" 4-1/2" BKR STRADDLE PATCH 0 > 8861' H 9-5/8"X 5-112"BKR S-3 PKR D=4.75" I 8886' H5-1/2" ' 5-1/2"TBG,17#,13CR-80 VAM TOP HC, —I 8949' t .0232 bpf,D=4.892" 1— 8964' —9-5/8"UNIQUE OVERSHOT 5-1/2"TBG STUB(08/27/08) H 8956' I 8978' —{5-1/2"HES XN NIP,D=4.455" 5-1/2"TBG,17#,13CR-80 VAM ACE NSCT, 8999' I C4 X 8999' --19-5/8"X 5-1/2"BKR S-3 PKR,D=4.75" .0232 bpf,D=4.892" l 1 9010' —15-1/2"X 4-112"X0,ID=3.870" TT ASSEMBLY DROPPED 6' 9 TBG TAIL 9032' —14-112"FES X NP,D=3.813" CROPPED 6' (SEE SAFETY NOTE) ' PER EXPRO 4-1/2"TBG,12.6#,13CR-80 NSCT, H 9060' 9053' H4-1/2"OTIS XN NP,D=3.725" LOG(03/22111 0152 bpf,D=3.958" V2 9044' H7'BKR TIEBACK SLEEVE,D=7.500" if,TOP OF 7"LNR —I 9224' hi , I 9-518"CSG,47#,L-80 BTRS,ID=8.681" 9457' M' ' 9052' H9-5/8"X 7"ZXP LW w/HMC HGR,D=6.280" PERFORATION SUMMRY ►�•�!• •••�4 9066' —4-1/2"WLEG,D=3.958" REF LOG:SW i BRCS ON 02/10/83 •••�• ,••••• (RT EXPRO LOG 3/22/11) •s•♦ ♦♦ ANGLE AT TOP PEW:28°@ 9770' ►i •.•� L 9054' —ELMD WLEG(10/12/02) il Note:Refer to Production DB for historical perf data AIi• .�4 SIZE SPF INTERVAL •, !.i 9066' —i7"X 4-112"XO,D=3.940" Opn/Sqz SHOT SQZ ••• �.i 2-7/8" 6 9770-9779 0 04/03/14 j•. 2-7/8" 6 9785-9794 0 04/03/14 ►• •, iii 3-3/8" 4 9800-9812 S 04/06/93 05/07/93 ►••, •i 3-3/8" 4 9944-10032 S 12/24/84 10/10/86 ►�• i!, 10000' —{MARKER JOINT(BEHIND 4-1l2"LNR) 2-7/8" 6 10022- 10032 'C 10/12/02 ►•� 10009'-10044' —4-1/2"BKR STRADDLE PATCH 3-1/8" 4 10044-10098 S 12/24/84 10/10/86 ►i, _,•� ►♦- 4 D=2.45"(TAGGED 01/08/12) 2-1/2" 5 10060-10075 0 03/14/03 ► i. • 2-7/8" 6 10075-10098 0 10/12/02 p 10090' —FISH-BTM PORTION OF PATCH 2-1/2" 5 10079- 10098 0 03/14/03 ►•� ,11.40 GUIDE SHOE(01/08/12) •COVERED BY PATCH ►=' ..•.•: •. 10126' H PBTD 4-1/2"TBG, 12.6#,L-80,.0152 bpf,D=3.958" 10210' 1..1...*.'*'*'1!4 7"LNR,26#,L-80,.0383 bpf,ID=6.276" —! 10330' DATE REV BY COMVENTS DATE REV BY CONVENTS PRUDHOE BAY MT 12/24/84 AUDI 3 ORIGINAL COMPLETION 04/09/14 GW/JMD ADFERFS(04/03/14) VVBL: H-20 08/19/02 N28E RWO 02/01/17 CJN'JMD SET EVO-TRIEVE PLUG w/JUNK CATCHER PR PERMT No:'1830070 09/04/08 014 RWO 03/14/17 ZV/JMD PULLED PLUG w/JUN(CATC3-ER(3/13/17) AR No: 50-029-20896-00 12/17/11 LEC/PJC PARTEDTBG(11/18/11) SEC21,T11N,R13E,480'FM_&1736'Fa 01/07/12 iRWM PJC SET STRADDLE PATCH(1/3/12) 01/09/12 TBD)PJC FISH-PATCH GLADE SHOE I BP Exploration(Alas ka) STATE OF ALASKA 0LASKA OIL AND GAS CONSERVATION COMMIS , REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program/ ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Vi- '1 o i test I 1 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 183-007 3. Address: P.O.Box 196612 Anchorage, Development l Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20896-00-00 7. Property Designation(Lease Number): ADL 0028284 8. Well Name and Number: PRUDHOE BAY UNIT H-20 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL RECEIVE!)������ 11.Present Well Condition Summary: Total Depth: measured 10330 feet Plugs measured 9947 feet true vertical 9242 feet Junk measured 10090 feet FEB 21 2017 Effective Depth: measured 9947 feet Packer measured See Attachment feet true vertical 8905 feet Packer true vertical See Attachment feet AOGGC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 41 -121 41-121 Surface 2651 13-3/8"72#L-80 39-2690 39-2690 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED � �+ 1 O 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 961 53414 240 860 1712 Subsequent to operation: 654 40318 0 860 1394 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development ® Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ree6 Phone +1 907 564 4424 Date 2/20/17 Form 10-404 Revised 5/2015 T� d/ �/ / RBDMS 7 217 Submit Original Only • • Packers and SSV's Attachment PRUDHOE BAY UNIT H-20 SW Name Type MD TVD Depscription H-20 PACKER 2137.72 2137.7 9-5/8" BOT External CSG PKR H-20 TBG PACKER 8864.74 7966.26 5-1/2" Baker S-3 Packer H-20 TBG PACKER 9007.99 8091.06 5-1/2" Baker S-3 Packer H-20 PACKER 9060.39 8136.38 4-1/2" Baker ZXP Packer • a) Q, O00000a I� COCOo � , coco0 CO I� I- LO N N LO C N V , r LO CO CO I- U y 0 0 Co 0 0 0 0 0 0 i CO CO • C) 3 O) aoco V" N r-- CO m CO CO o0 ti 00 CO N O CO LO O CO 6) co a) NI- - CO "Cr N O) 0 0 N N CO CA CA co co co co O 1111111111 O I� C) Cr) LO O) CO CO CO f- LO CO crO) CO CO N 0) Cr) O O N CO CO Co CO Co C CD NO — r- a) O I� M a) E 1 CA CO co CO CO O CD 0 0 CA O O .0 N N O c0 O O V I— p Q � O co CO LO N O CO LO c,-)Ch c) O NCS)CA O Q N O O _ CO O Y1 • W 0 o O O co C) CO co L O �Q O J J J CO J M J CD J _ = N c`) N ro J lA �� f�n/ X 4 V. CSO a CO O co _ N , _ U M LO LO N N r I O CD ii N TLc) 4 LO t +-, co CO CO CO O LO N 61 CO O In M t CO C 00 CO — CV — — M O LO LO J N N N- CO w w H Q Q C� woo •N U U w w O o� W cc cc Q z z z ZCCwwwwwmmm O D ~ ~ Z_ Z_ Z_ D D D • w Z Z J J I I- F- • y N l4 m .- CO N_ N M N CO co N 0 CO O V N CO O tf) . 4 6 0 a7 M N-• O c y LC) N- CO CD IC) i- N- o N 0 p I- N- N- 0) C) 0) O) O CD O O 0 CC) CO CO CO 0000 CO 000 H a O CO ":1" �- N CO 0 d' V CO CV co (C) O) CO CD V N- CO CD LC) 421 O 6 4 O) 0 6 M I� O 0 y N CO N- O O 6 N- OO O r N W I� N- O 0) O O C) O O O > p• O CO CO CO CO CO CO CO O O O) 0 > 2 H W 0 w Z 0 0 0 w ❑ H H J a W y Y U ° o' O O W m Y Y H cr g _ - U U w W 0 L a7 V N O N N O IC) CA W J J < < UJ w }' N aaiNC orn00000CC) Q Q ¢ w ° a z c� C p 0) CA 0 0 0 0 0 0 0 0 0 U 0 0 W U ❑ ❑ a) I r Z Z Z ° ❑ ❑ J _, ❑ ❑ 000 W � 4.< Z H ❑z 2 2 2 0 v) u) v¢) o Cl) Qa QMO H a W y O O O N O N- N- O p• N M 0 C 0) CD 0 0 0 0 0 O O O O O N COCZ 0 _ u = U O u) a 2 2 O Cl) (/) can v) Cl)a a � I y 0 U c u_ LL N N U) U) (/) C/) U) (I) Cl) is 0_ 0_ 0 0 0_ 0_ 0_ 0_ 0_ 0_ 0_ d < < cncncococacomooca a O t y a y H N- N- N- N- N- N- N- N ❑ 0 CD 0 C) CD 0 0 0 0 0 0 W Z C 0 0 0 CN N N N N N N N Z I `Q O U- m --- M �-Ea_ N N N CO CO CO 00 N N N N CO ❑ d ❑W J O W d V N N N N N Z J 0 w W a W O. < 0J H J J J D a O Q < pa uw) LI L U- a y E m z 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N coo- 0- 0- 0 -100w ILO_ U- NCC a 22 = _ _ _ _ = 22 = < < m co a U- cn cn a • • 2 b L.= 15 / \ \ .g o 2 g 0_ e < / % E 6 ^ : Cl) / - 2 \ Cl) 0 -(L' 2 % % D . \ / o \ / ± a Ca m < _IE CO 2 C \ m / COCT) -I > 2 ƒ / z< / � 5 ± I a 7 w 0 0 < c \ o / w § (0 ¥ / \ / J / \ 4 < m E < \ / D 2 2 0 L / E e � 2 � 2 � a � 2 a CL I- -1 § z 7 j - 0 �� ƒ G \ \ . _ = 00 - 2 / � / > < 0 \ � Q k / 0 �> I / \ E / E &_ ¢ 2 0- 0 0W & / � / k � / 0 UJ P o I � � 0_/ / w / D " - O o w I- CD CI * CO 2 2 w ± 2 < ccm \ / O \ / / gL = U O x 3 1- >, ƒ \ u)0 \ a i___ ƒ \ CI L w -1-,?; < / hu_ / \ C � 0 $ z• EO0O � Oz z I 5 � z O 0 \ \ 5 - « z ¥ yR / --I 0- 2 « # L = ? Q I I 4 4 u 2 5 * **<0 -) 000t1- 1-- . 0 Cl) : E : : R R c m m : 2 5 ± < » » 0 H \ c m 5 \ \ CO Q 2 ,- 0 0 < ►IEE.= CNV • • — VI�LFEAD= CNV SA NOTES.'**5-112"AND 4-12"CHROME A'"CTUATOR= OTIS H_z 0 TBG***TBG PARTED-DROPPED 6'PER EXPRO OKB_ELEV= 80.2' VIDEO LOG(0322!11) BF.ELEV= 45.05' I 1,4 ■ • I KOP= 3000' 1.4 '. 2081' —15-1/2"HES X NP,D=4.562" Max Angle= 36°@ 4100' 20"CONDUCTOR H ? ( 11� I �. Datum MD= 9919' 11� •. 2121' H9-5/8"HES CBNBJTER Datum TVD= 8800'SS A 1• 2134' —I 9-5/8"ECP • 9-5/8"CSG,47#,L-80 HYD 563,ID=8.681" —1 2078' Qi •1 9-5/8"BOWEN PATCH — 2153' -2157' 2 H9-5/8"CN PKR 13-3/8"CSG,72#,L-80 BTRS,ID=12.347" —1 2692' • , GAS LIFT MANDRELS ST_ MD TVD DEV TY PE VLV LATCH PORT DATE 3 3539 3513 23 MMG DOME RK 16 09/16/08 2 5972 5519 35 MMG SO RK 20 09/16/08 1 7744 6987 30 MMG DMY RK 0 09/03/08 Minimum ID =2.46" @ 14049' ' 8840' J--15-1/2"HES x NP,D=4.562" 4-1/2" BKR STRADDLE PATCH -� 8861' H9-5/8"X 5-1/2"BKR S-3 PKR,D=4.75" 8886' —5-1/2"HES X NP,D=4.562" 5-1/2"TBG,17#,13CR 80 VA TOP HC, H 8949' 1 .0232 bpf,ID=4.892" 8964' H 9-5/8"UNIQUE OVERSHOT 5-1/2"TBG STUB(08/27/08) — 8956' I 8978' H5 112"HES XN NIP,D=4.455" 5-1/2"TBG, 17#,13CR-80 VAM ACE t'SCT, H 8999' 0 ,- 8999' H9-5/8"X 5-112"BKR S-3 FKR,ID=4.75" .0232 bpf,D=4.892" 9 9010' —15-112*X 4-112"XO,D=3.870" TBG TAIL TT ASSEMBLY DROPPED 6' (SEE SAFETY NOTE) , 9032' —I¢1r2-HES NP,D=3.813- DROPPED PER IX PRO 4-1/2"TBG,12.6#,13CR-80 NSCT, H 9060' , 9053' — 41/2"OTIS XN NP,D=3.725" LOG(03/22/11 .0152 bpf,ID=3.958" TOP OF 7"LNR —j 9224' , ' _____ ' 7"BKR TACK SLEEVE,D=7.500" 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" H 9457' 9052' —9-5/8-X 7"ZXP LTP w/I-PAC HGR D=6.280" J PERFORATION SUMMARY ►•••• �9 9066' —4-112"WLEG,D=3.958" ►•i•i !•••4 REF LOG SWS-BRCS ON 02/10/83b. �•�•� (REF EXPRO LOG 3/22/11) ANGLE AT TOP PERF:28°@ 9770' ►� •%' 9054' —{ELME)WL EG(10!12/02) Note:Refer to Production 06 for historical perf data �•• •4 • 9066' —17"X 4-1/2"XO,ID=3.940' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ ►•4 ,•.4 ' — •2-7/8" 6 9770-9779 0 04/03/14 ►�� 9947' —41/2"EVO-TREVE PLUG w/JUNK CATC -ER 2-7/8" 6 9785-9794 0 04/03/14 ►i• i7 ►� FRONG(01/28117) 3-3/8" 4 9800-9812 S 04/06/93 05/07/93 ►•� --44-- •, 3-3/8" 4 9944-10032 S 12/24/84 10/10/86 •�•, 44 10000' — MARKER JOINT(133-11M34-1i2-LNR) 2-7/8" 6 10022-10032 "C 10/12/02 Ii•,I 10009'-10044' —4-1/2"BKR STRADDLE PATCH, 3-1/8" 4 10044-10098 S 12124/84 10/10/86 j • STATE OF ALASKA _KA OIL AND GAS CONSERVATION COMMioSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Repair Well Li Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development Exploratory ❑ . 183-007-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 . 50-029-20896-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: . ADL00282840 PBU H-20 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): - PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured . 10330 feet Plugs measured None feet ` = . , true vertical 9242.44 feet Junk measured 10090 feet Effective Depth measured • 10126 feet Packer measured See Attachment feet true vertical 9062 feet true vertical See Attachment feet k 3 1 1 0'1,,,, Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 45-125 45-125 0 0 Surface 2654 13-3/8"72#L-80 38-2692 38-2691.97 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9770-9779 feet 9785-9794 feet 9800-9812 feet 9944-10009 feet 10009-10022 feet 10022-10032 feet 10044-10060 feet 10060-10075 feet 10075-10079 feet 10079-10098 feet True Vertical depth 8749.2-8757.11 feet 8762.38-8770.28 feet 8775.54-8786.07 feet 8901.97-8959.02 feet 8959.02-8970.43 feet 8970.43-8979.22 feet 8989.76-9003.84 feet 9003.84-9017.04 feet 9017.04-9020.56 feet 9020.56-9037.3 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: p Intervals treated(measured): RBDM MAY 16 2014 Treatment descriptions including volumes used and final pressure: SCANNED JUN 1 9 2054 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 765 46269 396 0 1300 Subsequent to operation: 695 44195 352 0 1526 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development Q• Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil • Q Gas U WDSPIU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCO 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron(a�BP.Corn Printed Name Garry Catron Title PDC PE Signature 1"►ar4 Cti Phone 564-4424 Date 4/24/2014 J/LP 51Z v/ J I- A 570,0y Form 10-404 Revised 10/2012 Submit Original Only CC CC Lu Lu Y Y U U Q Q as w w p 6- J ▪.. . oDD u co coal p aMMX ~ U)v) u) wEt cc Ww mmcco < < mmmmm CV N N N N C7 [t N I� N CO o c7 Q CO N O) O) tri CO O) N L o t!1 pp N O) O — O) O) co 0000 J N O O a c ca Y 2 co rn rn o 0 CO a CCWWww aYYYYY X100000 QQQQQ aaaEa � as co 0 0 0 0 0 Z N N N N 3 2 2 2 2 2 co co O 000000000 Cp COCO0 - N- 00000 N- CnTr °' CONNCn C Tr Nr N- 0 N CO CO r- C.) r+ 00000 0000 CD 00 N Tr r- CD r- Cn 04 0 0 CO N CD N N- 0 T- CO 0- M V 00 C) O O) Tr TrT- NCACO O � 00 N 00 0 0) 00 N 00 00 03 01 0) N CO O 000 r 0 0 0 (Ni 0 6 00 in ui Nr MCO Nin 0 co co Tr 0) CA O O N 00000 0000 O O N co toOD U1 CD C Tr 0 0 0 0 00) 0 0 N 0 N 0D 0) 0) • CI CO QN 0) C4) Tr ) CO V N � w � C'7 0 OD 1.10 NCV N 0) ON) O M M 000 00) C C Q Q c) c, 000 c) 000 0OO O g CI J J J CO J J M J • 0M # 4t • COOJulN U) x ,r ,rN *k O N 0\p CV N N j M N N i , M I �- +r CO CO CO CO V' Nt C1ON01000LO0M000 C co N M CO O) Ill LO CU N N- 1 '- N CO W W co O-o 0 0 IJJ p wu w a c c u. Z Z Z Z W W W W W m m m Q 1- H Z Z Z o D D D ZJJJCnF- f- H Z _ \ / / / $ < ? 0 0- CI U) -I < 2 _1 _ 4, X L < a 2 t 2 I b < E ! 0 D ? / E< / 0 Egz / / \ � � R ® a I / 7 b >H D 0 U) ^ ( i CC < 2 I % 0 _� LL$ ƒ0 LL 0 0 « ■ -J L 002_ W 0H § b ƒ �' , / < % & o L < / WO ? E / 0 "7 \ a @ Fp cLi / � Ra e ® a. g \ I 2 - ± 2 < o 0 o G 2 O CO t e g e ® =I 2 u c \ 3 I < O � � / \ \ < � � \ 0 DOz � . k 0_1:1_ \ \ �9 � ƒ $ ƒ z % i ƒ \ CO / _I k / / _/ H / 0 \ 2 / , g g \ / / / \ 2 I \ ± < m @ ± 5 - / co / ƒ 11 m w co \ I \ < / \ 2 / C « O / I 0 a) LLIco ll a : 0c71 ,- \ $ / / 01- 0 ° i c I \ f ZHZc 2 \ / < \ / 0 U)0 LU § kOLL � , f % $ ƒ f 0 k � � \ -JOOHO / / / z / \ / \ / \ f � JRI- „n I- / © mho / q \ U \ / y0—Eo UJ \ > °-,H‹ kfk / f i i i E $ ¢ : iU) 11-111J � _I LI I. ? \ { # # \\ / / / TREE= aw aLHEAO Cn AGTIIATOR= OT1S H-20 TBG"' TBG PAR" WTED-DROPPED 6'PER EXPRO --� J-E OKB.0/E.%= 802 VIDEO LOG(03/22/111 BF.B.EV= 45.05' I ' 11 KOP= _ 3000' 4 , _ V 2081' H 5-1/2-HES X NP,D=4.562" Max Angie 36"@ 4104 20"CO4•UUCTOR 1 kt Datum MD_—.._ 9919 2121' -9-5/8'FES CEMENTER Datum TVD= 8800'SS •• ►• 2134' H9-5/8"ECP 9-5/8"C-Sr,47#,L-80 HYD 563,ID=8.681" H 2078' Vie. 1.14. 9-5/8"BO'WEN PATCH -{ 2153' -2157' 2640' H9-518'DV PKR 13-3/8"CSG,72#,L-80 BTRS,ID=12.347" --{ 2692' , GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3539 3513 23 MMG DOME RK 16 09/16/08 2 5972 5519 35 IMAG SO RK 20 09/16/08 1 7744 6987 30 MAG DON RK 0 09/03/08 Minimum ID =2.46" @ 10009' 8840' H 5-1/2"FES X NP,D=4.562" 4-1/2" BKR STRADDLE PATCH M ,- 8861' 1-9-5/8'X 5-1/2"BKR S-3 PKR,D=4.75' 8886' H5-1/2"FES X NP,D=4.562' 5-1/2"TBG,17#,13CR-80 VAM TOP HC, H 8949' .0232 bpf,ID=4.892" 8964' H9-5/8"UNIQUE OVERSHOT 5-1/2"TBG STUB(08/27/08) H 8956' 8978' HS 112"HES XN NIP D=4.455' 5-1/2"TBG, 17#,13CR-80 VAM ACE NSCT, H 8999' KA 8999' -9-5/8"X 5-1/2"BKR 5-3 PKR,ID=4.75" 0232 bpf,D=4.892" l 9010' -15-1/2"X 4-1/2"XO,D=3.870" TBG TAIL TT ASSEMBLY DROPPED 6' (SEE SAFETYNOTE) PER EXPRO , 9032' -1a lrrFiEsxr�,D=3.813• 6' 4-1/2"TBG,12.6#,13CR-80 NSCT, H 9060' LOG{03122/11 9053' -�4-112'OTIS XN NP,D=3.725" .0152 bpf,ID=3.958" TOP OF 7'LNR -1 9224' 09044' -j 7"BKR TRACK SLEEVE,D=7.500' 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" -{ 9457' 16 ' 9052' I-9-5/8"X 7"ZXP LW w/MAC HGR ID=6.280" PERFORATION Sl1tiI41ARY 0••i 9 9066' -4-1/2'WLEG,D=3.958' REF LOG:SWS-BHCS ON 02J1a83 ►�•�i .•••�•� (F EXR )LOG 3/22/11) ►•• ••. ANGLE AT TOP PERF:28'@ 9770' ►moi .•• 9054' H 6.M)WLEG(10/12/02) Note:Refer to Roduction DB for historical pert data ►i! •�i ►•! '•• 9066' 7"X 4-1/2"XO,D=3.940" SIZE SPF NTB?VAL Opn/Sqz SHOT SQZ ►•! ♦•j 2-7/8" 6 9770-9779 0 04/03/14 *_. j•: •4 2-7/8" 6 9785-9794 0 04/03/14 �•. �•. 3-3/8" 4 9800-9812 S 04/06/93 05/07/93 ►•i •�i •. !• 10000' —1MARKER JONT(BEHIND 41/2"LNR) 3-3/8" 4 9944-10032 S 12/24/84 10/10/86 ;•; _ _ D4 2-7/8" 6 10022-10032 'C 10/12/02 0 4. 10009'-10044 —4-1/7 BKR STRADDLE PATCH, •3-1/8" 4 10044-10098 S 12/24/84 10/10/86 0•! .41 ►• ♦ D=2.45"(TAGGED 01!08!12) •2-1/2' 5 10060-10075 0 03/14/03 ,�•• 2-7/8" 6 10075-10098 0 10/12/02 Oi 10090' 1 FISH-BTM PORTION OF PATCH 2-1/2" 5 10079-10098 0 03/14/03 ►�! GIJDESHOE(01/08/12) 'COVERED BY PATCH ►' •1 �♦ •••!♦•4 10126' -I PBTD ... 41 4-1/2"TBG, 12.6#,L-80,.0152 bpf,0=3.958" - 10210' 1..1.1 1., 7"LNR,26#,L-80,.0383 bpf,D=6.276' -{ 10330' DATE REV BY COM ENTS DATE REV BY COMMENTS FiUJHOE BAY UNIT 12/24/84 Alia 3 ORIGINAL COMPLETION 12/17/11 LEO PJC PARTED TBG(11/18/11) WELL: H-20 08/19/02 N28E RWO 01/07/12 RWM'PJC SET STRADDLE PATCH(1/3/12) PERMIT No: 1830070 09/04/08 1)14 MO 01/09/12 TBD/PJC FISH-PATCH GUDE SHOE AR No: 50-029-20896-00 08/16/08 JKLYSV SET WRP/JET CUT(07/30/08) 04/09/14 GW/JMD ADPERFS(04/03/14) SEC 21,T11N,R13�480'FNL&1736'Fa 09/06/08 TLH CORRECTIONS 02/04/09 FC/AD DWG DRAFT CORRECTIONS BP Exploration(Alaska) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 5ukttikElp AUG Mr. Jim Regg ‘`6 3^ oo`7 Alaska Oil and Gas Conservation Commission (� 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB H -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad H that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, `'d Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) Date: 03/17/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal H -01A 1951100 50029200990100 0.7 NA 0.7 NA 5.10 2/17/2010 H -02A 2021600 50029201000200 0.5 NA 0.5 NA 5.10 2/16/2010 H -03 1710190 50029201030000 0.2 NA 0.2 NA 1.70 2/16/2010 H -04A 2031610 50029201040100 0.3 NA 0.3 NA 3.40 2/14/2010 H-05B 2091000 50029201060200 0.3 NA 0.3 NA 5.10 3/9/2010 H -06 1770020 50029202380000 0.1 NA 0.1 NA 0.85 2/16/2010 H -07A 2001280 50029202420100 0.6 NA 0.6 NA 3.40 2/15/2010 H -08 1770230 50029202470000 0.4 NA 0.4 NA 3.40 2/15/2010 1-1-09 1800640 50029204820000 21.6 5.0 0.8 7/12/2010 3.40 7/8/2011 H -10A 1971900 50029204870100 0.3 NA 0.3 NA 1.70 2/19/2010 H -11 1800680 50029204850000 0.3 NA 0.3 NA 1.70 2/18/2010 H -12 1800670 50029204840000 0.3 NA 0.3 NA 1.70 2/18/2010 H -13A 2090440 50029205590100 0.1 NA 0.1 NA Trace 2/18 /2010 H -14B 2071160 50029205800300 0.1 NA 0.1 NA Trace 2/18/2010 H -15 1810610 50029205910000 0.4 NA 0.4 NA 3.40 2/18/2010 H -16 2000650 50029205920200 0 NA NA NA NA NA H -17A 1971520 50029208620100 21.5 6.0 0.4 7/12/2010 1.70 7/8/2011 H -18 1822100 50029208800000 0.1 NA 0.1 NA 0.50 2/27/2010 H -19B 1980940 50029208830200 3.5 NA 3.5 NA 23.80 2/24/2010 ' . H -20 1830070 50029208960000 6.7 NA 6.7 NA 47.60 2/22/2010 H -21 1860710 50029215750000 0.5 NA 0.5 NA 3.40 2/15/2010 H -22A 1970480 50029215880100 0.1 NA 0.1 NA 0.85 2/15/2010 H -23A 1950850 50029217940100 5 NA 5 NA 32.30 2/17/2010 H -24A 2071330 50029215120100 0.7 NA 0.7 NA 3.40 2/28/2010 H -25 1852680 50029214780000 0.1 NA 0.1 NA 0.85 2/26/2010 H -26 1852770 50029214870000 2.3 NA 2.3 NA 17.90 2/23/2010 H -27A 2030590 50029214560100 0.1 NA 0.1 NA 0.85 2/21/2010 H -28 1880440 50029218060000 0.5 NA 0.5 NA 3.40 2/17/2010 H -29A 1980380 50029218130100 5.2 NA 5.2 NA 57.80 2/16/2010 H -30 1880350 50029218000000 1.7 NA 1.7 NA 11.90 2/16/2010 H -31 1940140 50029224440000 0.7 NA 0.7 NA 5.10 2/18/2010 H -32 1940250 50029224490000 0.3 NA 0.3 NA 1.70 2/18/2010 H -33 1940380 50029224580000 0.1 NA 0.1 NA 1.70 2/16/2010 H -34 1971640 50029228030000 1.3 NA 1.3 NA 13.60 2/19/2010 H -35 1951490 50029226000000 1.7 NA 1.7 NA 15.30 2/16/2010 H -36A 2000250 50029226050100 1.3 NA 1.3 NA 11.90 2/17/2010 H -37A 2000970 50029227720100 1.2 NA 1.2 NA 10.20 2/20/2010 H -38 2081670 50029234020000 Dust cover NA NA NA NA 3/17/2012 t STATE OF ALASKA ALAS L AND GAS CONSERVATION COMMISS REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate ❑ Other el PATCH 10009' - 10044' Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ Waiver Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development El Exploratory ❑ 183 -0070 3. Address: P.O. Box 196612 Stratigraphic Service ❑ 6. API Number: Anchorage, AK 99519 -6612 . 50- 029 - 20896 -00 -00 8. Property Designation (Lease Number) : 9. Well Name and Number: ADLO- 028284 a PBU H -20 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10330 feet Plugs (measured) 10126 (TOC) feet true vertical 9242.44 feet Junk (measured) 10090 feet Effective Depth measured 10287 feet Packer (measured) SEE BELOW feet true vertical 9204.39 feet (true vertical) SEE BELOW feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 35 - 115 35 - 115 Surface 2658' 13 -3/8" 72# L -80 34 - 2692 34 - .2692 4930 2670 Production 9424' 9 -5/8" 47# L -80 33 - 9457 33 - 8476 6870 4760 Liner 1166' 4 -1/2" 12.6# L -80 9044 - 10210 8122 - 9136 8430 7500 Liner 1106' 7" 26# L -80 9224 - 10330 8277 - 9242 7240 5410 Perforation depth: Measured depth: SEE ATTACHED - _ y �� S �? _ _ True Vertical depth: _ _ _ Tubing: (size, grade, measured and true vertical depth) 5 -1/2" 17# 13Cr80 32 - 8999 32 - 8083 4 -1/2" 12.6# 13Cr80 9010 - 9066 8093 - 8141 Packers and SSSV (type, measured and true vertical depth) 9 -5/8" DV Packer 2640 2640 5 -1/2" Baker S -3 Packer 8861 7963 5 -1/2" Baker S -3 Packer 8999 8083 7" Baker ZXP Top Packer 9052 8129 4 -1/2" Baker Straddle Packer 10009 8959 4 -1/2" Baker Straddle Packer 10039 8985 12. Stimulation or cement squeeze summary: I R9 Intervals treated (measured): AEN 2 4 1012 Treatment descriptions including volumes used and final pressure: :.. .. -., :-., 1..&,ff ;uns. Commission 13. Representative Daily Average Production or Injectic atOtOTs,V Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 623 33,437 446 1837 Subsequent to operation: 784 35,460 579 869 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory Development ig s Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil - is Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAGE GINJ ❑ SUSP❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Nita Summerhays r Printed Name Nita Summerha s Title Data Manager ilIMENS SignatureAff _, y Phone 907- 564 -4035 Date 1/23/2012 rorm 10 01 Rovi ■ s 10/20 74- . ? / Submit ' JAN 26 2012 2* -1*).- 7 l• Z � Z..i H -20 183 -007 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base H -20 12/24/84 PER 9,944. 10,032. 8,901.97, 8,979.22 H -20 12/24/84 PER 10,044. 10,098.1 8,989.76 9,037.3 H-20 10/10/86 SQZ 9,944. 10,032. 8,901.97 8,979.22 H -20 10/10/86 SQZ 10,044. 10,098. 8,989.76 9,037.3 10/25/86 RPF 10,044. 10,0- 0 10,032. H -20 � __ 98.; 8,989.76 9,037.3 H -20 1 4/6/93 APF 9,800. - 0,8 , 8 775.54 8 786.07 H -20 5/5/93 SPS 9,944. 8,901.97 8,979.22 H -20 5/5/93, SPS 10,044. 10,098. 8,989.76 9,037.3 III H -20 5/7193 j SQZ 9,800_ . 10,032. � 9,800. 9,812. 8,775.54 8,786.07 H -20 5112/93 SPR 9,944 - 8,901.97 8,979.22 � H -20 i 5/12/93 SPR 10,044. 10,098. ! 8,989.76 9,037.3 H-20 8/5/02 SQZ 9,700. 10,098.1 8,687.55 9,037.3 H-20 10/12/02 RPF 10,022. 10,032. 8,970.43 8,979.22 H -20 10/12/02' RPF 10,075. 10,098. 9,017.04 9,037.3 H -20 ! 3/14103 APF 10,060. 10,075.1 9,003.84 9,017.04 H-20 3/14/03 APF 10,079. 10,098.1 9,020.56 9,037.3 H-20 1/8/12 MIS 10,009. 10,044. 8,959.02 8,989.76 AB ABANDONED PER PERF APF ADD PERF RPF 1 REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER 1 BPS BRIDGE PLUG SET SPR * SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET III MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE FIL FILL SQF SQUEEZE FAILED MIS MECHANICAL ISOLATED STC ;STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • H -20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 1 ACTIVOYDATE 1 SUMMARY 11/17/2011 ** **WELL S/I ON ARRIVAL * ** *(patch /tubing liner) R/U SLICKLINE FOR BAKER DUMMY PATCH DRIFT * * * *CONT JOB ON 11- 18- 11 * * ** 11/18/2011 * * * *CONT JOB FROM 11- 17 -11 * ** *(patch /tubing liner) DRIFT W/ BAKER DUMMY PATCH DRIFT W/ CONE BOTTOM TO TD @ 10,085' SLM.(passed through easily from 8990' SLM to 9100' SLM). RUN KJ, 2.25" CENT, 2' x 1.50" STEM, 2.25" BLIND BOX TO 8983' SLM.(unable to pass). RUN 2.25" CENT, 2' x 1.50" STEM, 2.20" CENT, 5' x 1.50" STEM, 2.25" BLIND BOX TO 10,085' SLM(able to pass through 8983' SLM). FWHP= 1800/380/0 * ** *WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED * * ** 12/2/2011 ** *COST PLACEHOLDER FOR BAKER MACHINE SHOP TO MAKE 3.5" PIN ON BOTTOM OF 45KB PACKER * ** 1/2/2012 * ** WELL SHUT -IN ON ARRIVAL * ** (SLB E -LINE - SET 4.5" BAKER STRADDLE PACKER) INITIAL T /I /O = 1600/400/0 PSI SPOTTED EQUIPMENT, HELD SAFETY MEETING, PERFORMED DUAL BARRIER TEST. BEGAN RIGGING UP AND 3RD PARTY CRANE STARTED ACTING UP POSSIBLY DUE TO WEATHER. WAIT TO RESOLVE HYDRAULIC ISSUE. PICKED UP LUBRICATOR AND MADE UP TOOLSTRING. HOT CHECKED AND ARMED. 3RD PARTY'S CRANE SWIVEL NOT ROTATING. APPLIED HEAT TO IT AND GOT IT TO SPIN. PROCEED WITH RIG UP. CHANGED OUT WITH NIGHT CREW. APPLIED HEAT TO THE LUBRICATOR FOR 30 MINUTES PRIOR PRESSURE TEST TO PREVENT FROZEN O- RINGS. PRESSURE TESTED LUBRICATOR AND RIH WITH 4.5" BAKER STRADDLE PACKER ASSEMBLY ** *JOB IN PROGRESS * ** 1/3/2012 ** *JOB CONTINUED FROM 3- JAN - 2012 * ** CONTINUE RIH. PERFOMED TWO CORRELATION PASSES. TIE IN TO SLB BHCS LOG DATED 10 -FEB -1983. PULLED INTO SETTING POSITION AT 10001' CCL DEPTH. CONFIRMED WITH WSL PATCH SET DEPTH = 10012'- 10042' AND CCL TO TOP OF PATCH = 11'. GOOD CONFIRMATION AT SURFACE OF SETTING. LOST 670LBS AND TAGGED PATCH PRIOR POOH. POOH SURFACE VERIFICATION THAT PATCH MISSING, SETTING SUCCESSFUL FINAL T /I /O = 1600/400/0 PSI * ** JOB COMPLETE. WELL SHUT -IN UPON DEPARTURE * ** • • 1/8/2012 ** *WELL 3/1 ON ARRIVAL* **(patch tubing /liner) RAN 2.20" BARBELL W/ 2.0" BLINDBOX, SHEARED GUIDE SHOE IN 4 -1/2" KB STADDLE PATCH @ 10044' SLM AND PUSHED TO TD @ 10090' SLM ** *WELL LEFT S /I, PAD OP NOTIFIED * ** FLUIDS PUMPED BBLS 4 Diesel 10 Meth 14 TOTAL TREE _ CM/ • WELLHEAD = CM/ SAFETY S: * * *5 -1 /2" AND 4-1/2" CHROME ACTUATOR = OTIS H -2 0 TBG* ** TBG PARTED- DROPPED 6' PER EXPRO KB. ELEV = 80.2' VIDEO LOG (03/22/11) BF. ELEV = 45.05' I • � ■ I. 1 KOP = 3000' l'� / * 4 4 I 2081' H5-1/2" HES X NIP, ID = 4.562" Max Angle = 36° @ 4100' 120" CONDUCTOR H ? I) /ii *4 Datum MD = 9919' /��s. If 2121' H9-5/8" HES CEMENTER I Datum TVD = 8800' SS ���a I • A / 2134' H9 -5/8" ECP I tl 19 -5/8" CSG, 47 #, L -80 HYD 563, ID = 8.681" I 2078' ► * � 1 I9 -5/8" BOWEN PATCH H 2153' - 2157' - - 2640' H9-5/8" DV PKR I 113 -3/8" CSG, 72 #, L -80 BTRS, ID = 12.347" H 2692' I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3539 3513 23 MMG DOME RK 16 09/16/08 2 5972 5519 35 MMG SO RK 20 09/16/08 1 7744 6987 30 MMG DMY RK 0 09/03/08 Minimum ID = 2.45" @ 10009' I 8840' I- I 5 -1/2" HES X NIP, ID = 4.562" 1 4 -112" BKR STRADDLE PATCH 1 8861' I- I9 -5/8" X 5 -1/2" BKR S -3 PKR, ID = 4.75" I I 8886' 1-15-1/2" HES X NIP, ID = 4.562" I 5 -1/2" TBG, 17 #, 13CR -80 VAM TOP HC, -I 8949' I .0232 bpf, ID = 4.892" 8964' H 9 -5/8" UNIQUE OVERSHOT I 15 -1/2" TBG STUB (08/27/08) 1 8956' 1 8978' I -I5 -1/2" HES XN NIP, ID= 4.455" I 5-1/2" TBG, 17 #, 13CR -80 VAM ACE NSCT, -I 8999' 1 _ I 8999' H9-5/8" X 5-1/2" BKR S -3 PKR, ID = 4.75" I .0232 bpf, ID = 4.892" 1 9010' F15 -1/2" X 4 -1/2" XO, ID = 3.870" / TBG TAIL TT ASSEMBLY DROPPED 6' (SEE SAFETY NOTE) 9032' H4 -1/2" HES X NIP, ID = 3.813" I DROPPED 6' 0 PER EX PRO 4 -1/2" TBG, 12.6 #, 13CR -80 NSCT, --I 9060' 1 9053' H4 -1/2" OTIS XN NIP, ID = 3.725" I LOG (03/22/11 .0152 bpf, ID = 3.958" 'TOP OF 7" LNR H 9224' 9044' I-{ 7" BKR TIEBACK SLEEVE ID = 7 1 9052' 1-19-5/8" X 7" ZXP LTP w /HMC HGR, ID = 6.280" 19 -5/8" CSG, 47 #, L -80 BTRS, ID = 8.681" I-I 9457' ►V•.• �� 9066' I- 4-1/2" WLEG, ID = 3.958" ••■ ••/ PERFORATION SUMMARY ••• • • • ■ l�•�• (REF EXPRO LOG 3/22/11) REF LOG: SWS -BRCS ON 02/10/83 r � % •1• 9054' H ELMD WLEG (10/12/02) 1 • ANGLE AT TOP PERF: 29° @ 10022' • ■ ■ j • 1 • Note: Refer to Production DB for historical perf data ∎ • • ��� 9066' H 7" X 4 -1 /2" XO, ID = 3.940" 1 SIZE SPF INTERVAL Opn /Sqz DATE ► i� * • 3 -3/8" 4 9800 - 9812 S 05/08/93 0 :! 3 -3/8" 4 9944 - 10032 S 10/09/86 . 4, !• V ■• 10000' -I MARKER JOINT (BEHIND 4 -1/2" LNR) 2 -7/8" 6 10022 - 10032 *C 10/12/02 3-1/8" 4 10044 - 10098 S 08/19/02 i roll Lwow- 10044' - 4-1/2" BKR STRADDLE PATCH, 2 -1/2" 5 10060 - 10075 O 03/14/03 ∎�•._. !• ID = 2.45" (TAGGED 01/08/12) 2 -7/8" 6 10075 - 10098 O 10/12/02 ►�• ME 2 -1/2" 5 10079 - 10098 O 03/14/03 j�• 10090' 1- FISH- BTM PORTION OF PATCH ♦∎ ►�! GUIDE SHOE (01/08/12) 1 'COVERED BY PATCH ► � • , ! H 4 -1/2" TBG, 12.6 #, L -80, .0152 bpf, ID = 3.958" I 10210' 10126' PBTD 144444 44, 1 7" LNR, 26 #, L -80, .0383 bpf, ID = 6.276" I 10330' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/24/84 AUDI 3 ORIGINAL COMPLETION 12/17/11 LEC/ PJC PARTED TBG (11/18/11) WELL: H -20 08/19/02 N28E RWO ; 01/07/12 RWM/ PJC SET STRADDLE PATCH (1/3/12) PERMIT No: 1830070 09/04/08 D14 RWO 01/09/12 TBD/ PJC FISH - PATCH GUIDE SHOE API No: 50- 029 - 20896 -00 08/16/08 JKD /SV SET WRP /JET CUT (07/30/08) SEC 21, T11N, R13E, 480' FNL & 1736' FEL 09/06/08 TLH CORRECTIONS 02/04/09 PC /JMD DRLG DRAFT CORRECTIONS BP Exploration (Alaska) 03/24/11 Schintherger NO. 5709 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gembe6 Street, Suite 480 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 01 -20 BBSK -00054 PRODUCTION PROFILE warkrlollIMMO ' ' F T '7 kk 1 09-46 BMSA -00006 PRODUCTION PROFILE . rjE1MIONE ' ' v . ] 1 14 -05A BBKA -00090 PRODUCTION PROFILE - G y nt . � r � n ? 1 12 -30 BBSK -00055 �>� >`AZILR! ' �J7•Sr�:�1 1 D -22C BCRD-00086 Q.74%I1:1! 111 AAIIIIMIIIIIII 1 09 -02 BBSK -00052 PRODUCTION PROFILE ' yT.Ti 4", 1 >• �r.�cZy 09-41 BBSK -00053 PRODUCTION PROFILE �(j ,�i�>ii'� �� ' 1 15 -05A BCRD -00084 isi)La� ' � - rlikaft1 1 H -15 BCRD -00083 ®iZetar. iiirEINIIMPIN'Rii10 1 F -35 BG4H -00037 • RODUCTION PROFILE 0 02/22111 1 Mal 1 • Z -31 BJOH -00009 NJECTION PROFILE a £ / a 02112/11 1 1 _ , 06 -16 BCRD -00090 • - • . • , P - •. 1. ' V • - X - 1 7 WOK-00008 �L, IIG' -Z4 1 H -20 BBSK -00051 - '�.::r2111FAII'+4 ' _ 1 06 -20A BNWP -00003 RST O — a A. 02/17111 1 P OS>r. 1 _ 1111111•111111=111M•11111=1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 \ \ -i c ` - p A ,I id�� I 03/08/11 Schhimberger NO. 5701 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gamhell Street, Suite 400 Alaska Oil 8 Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date EL Color CD W -202 BMSA -00004 MDT '/() — / 5 01/22/11 X0 1 1 W -202 BMSA -00005 ISOLATION SCANNER (USIT j)— / 3 01/30/11 1 1 V -02 8L85.00016 SCMT a /3 („f.. C)- 02/01/11 1 1 A -39A 8L65 -00018 MEM DEPTH CORRELATION 0 — 't 02/03/11 1O- 1 J -17C BAUJ -00061 MEM PROD PROFILE i-J Cis" 02/09/11 1 Q'}9 a 1 18 -13C AWJI.00126 MEMORY CBL 0/4 -. / 02/10/11 ' / I 1 R -12 BBKA -00087 PRIMARY DEPTH CONTROL LOG /'fj 1.1.3.. 02/18/11 1 °, 1 D -21 _ BG4H -00036 PRODUCTION PROFILE ( a. 02/20/11 1 1 ./7> P2-5 BJOH -00010 PRODUCTION PROFILE (� } ry y J 02/13/11 1 1 H -20 BBSK -00051 PRODUCTION PROFILE • �j �5 02/11/11 1 Q $ 1 P2 -52 BCRD -00082 SCMT ci `} — r7d ( 02/10/11 00'3 1 1 • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data 8 Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 MAR 1 5 Z O A i S i .:, ., MAP, .4?Oil C ...... r. . . , a . t ('� " -,' (t .�. p .� CAW, l'v�r' P+f °,4` 'T, --~~ STATE OF ALASKA io--~-off AKA OIL AND GAS CONSERVATION CO~SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ® Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 183-007 - 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 SO-029-20896-00-00 7. KB Elevation (ft): 80 20 9. Well Name and Number: P®U H-20 - 8. Property Designation: 10. Field /Pool(s): ADL 028283 - Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 10330 - feet true vertical 9242 - feet Plugs (measured) None Effective depth: measured 10287 feet Junk (measured) None true vertical 9204 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2692' 13-3/8" 2692' 2692' 4930 2670 Intermediate Production 9457' 9-5/8" 9457' 8476' 6870 4760 Liner 1104' 7" 9224' - 10328' 8277' - 9241' 7240 5410 Scab Liner 1166' 41/2" 9044' - 10210' 8122' - 9136' 8430 7500 n ~`~ v~~d~~tlc~' ~~z°~ ~[~ ._ Perforation Depth MD (ft): 9800' - 10098' Perforation Depth TVD (ft): 8776' - 9037' 5-1/2", 17# x 4-1/2" , 12.6# 13Cr80 \ L-80 9058' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 5-1/2" Baker S-3 Packers 8861' & 8999' 9-5/8" x5-1/2" Baker ZXP packer with tieback sleeve 9052' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final p ressure: Cut and pull tubing from 8956'. Cut and pull9-5/8" casing from 2154'. Run 9-5I8" (47#, L-80, TC-II) tieback to surtace. Cement w/ 155 bbls Class 'G' w/ Gas-Blok 870 cu ft / 744 sx . Clean out and run new Chrome tubin . 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after ork: q,`I~~ Explorato ®Development ^ Service Daily Report of Well Operations 16. W I Status after work: ® Well Schematic Diagram (Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A ~ C.O. Exempt: Contact Paul Ghan, 564-5254 308_280 Printed Name Sondra Stewman Title Drilling Technologist Prepared By Name/Numbet: Si tune ,Phone -564-5743 Date (l~°Qj -O`~ Sondra Stewrtnan 564-4750 Form 10-404 Revised 04/2006 ~~ ~ Submit Original Only ~ t~~ ~~ TREE = 6" MCEV OY WELLHEAD = MCEVOY ACTUATOR = OTIS KB. ELEV = 80.2' BF. ELEV - 45.05' KOP = Max Angle = 3000' 36 @ 4100' Datum MD = 9919' Datum TV D = 8800' SS 9-5?8" SCAB CSG, 47#, L-80, ID = 8.681" I 2157' 13-3/8" CSG, 72#, L-80, ID = 12.347" 2692 ~ 5-1/2" TBG, 17#, 13-CR, .0232 bpf, ID = 4.892" ~~ 8$56' 5-1/2" TBG, 17#, 13-CR, .0232 bpf, ID = 4.892" I~ 9003' Minimum ID = 3.725" @ 9047' 4-112" HES XN NIPPLE TOP OF 7" LNR 9224' 9-5/8" CSG, 47#, L-80, ID = 8.681 " 9457' PERFORATION SUMMARY REF LOG: SWS-BHCS ON 02/10/83 ANGLE AT TOP PERF: 29 @ 9800' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9800 - 9812 S 05/08/93 3-3/8" 4 9944 - 10032 S 10/09/86 2-7/8" 6 10022 - 10032 O 10/12/02 3-1/8" 4 10044 - 10098 S 08/19/02 2-1/2" 5 10060 - 10075 O 03/14/03 2-7/8" 6 10075 - 10098 O 10/12!02 2-1/2" 5 10079 - 10098 O 03/14/03 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 10210, PBTD 10287' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10328' MARKER JOINT (BEHIND 4-1/2" LNR) ~ Fasdril plug pushed to 10,011' 26' ~-+LANDINGCOLLAR(ESTIMATED DATE REV BY COMMENTS DATE REV BY COMMENTS 12/24/84 ORIGINAL COMPLETION 07/21/07 SWC/PJ SET PXN PLUG (07/07/07) 08/19/02 JDM/KK RWO 09/04108 D14 RWO 10/12/02 TMN/KK ADPERFS; ELMD WLEG 09/06;08 TLH CORRECTIONS 10/04/02 SDF/KK GLV C/O 10/17/02 MWKAK GLV C/O 03/14/03 PWE/TLH ADPERFS PRUDHOE BAY UNff WELL: H-20 PERMff No: 1830070 API No: 50-029-20896-00 SEC 21, T11 N, R13E, 479.9' FNL, 1735.6' FEL BP Exploration (Alaska) GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3539 3513 23 iirllvfG DCR RKP 09/03?08 2 5972 5519 35 (v1MG DMY RK 09!03;'08 1 7744 6987 30 MI~9G DMY RK 09?03?48 $ 1' 5-1/2" HES X NIP, ID = 4.562" 8861' 9-5/8" X 5-1/2" BKR S-3 PKR, ID = 4.75" $$$6' 5-1/2" HES X NIP, ID = 4.562" 8964' Unique Machine Overshot 8978' S-1/2" HES X NIP, ID = 4.562" 8999' 9-5/8" X 5-1/2" BKR S-3 PKR, ID = 4.75" 9004' 5-1/2" X 4-1/2" XO, ID = 3.870" 9026' 4-1/2" HES X NIP, ID = 3.813" 9047' 4-1/2" OTIS XN NIP, ID = 3.725" 9052' 9-5/8" X 5-1/2" BKR ZXP PKR W/ TIEBACK SLV 9058' 4-1/2" WLEG, ID = 3.958" 9054' ELMD WLEG (10/12/02) Page 1 ~of 1 • Well: H-20 • Well History Well Date Summary H-20 7/28/2008 ***WELL S/I ON ARRIVAL*** PULL PXN TTP FROM 9034' SLM DRIFT 5.5" TBG TO 5.5" x 4.5" XO @ 8989' SLM, 15' CORRECTION TO 9004' MD DRIFT 4.5" TBG W/ 3.70" CENT & S. BAILER, TD ~ 10103' CMD (5' RAT HOLE) DRIFT W/ 4.50"G-RING TO 8969'SLM, SAT DOWN AT XN- NIP (NO PROBLEMS) ***LEFT WELL SI AND TURNED OVER TO PAD OP*** H-20 7/29/2008 T/I/0= 200/0/0 Temp= S/I Assist E-Line pump as directed, CMIT TxIA PASSED to 3500 psi. (RWO Prep) Pressured up TxIA to 3575/3500psi w/ 25.4bbls 70*f crude. CMIT TxIA lost 80/80psi in 1st 15 min, and 45/40psi in 2nd 15min, with a total loss of 125/120psi over 30 min test. Bled IAP. Bled back 8bbls. FWHP's= 2900/100/0. ***Annulus casing valves tagged and left open to gauges*** SLB still on well at time of departure. H-20 7/29/2008 ***WELL SHUT-IN UPON ARRIVAL*** INITIAL T/I/O = 200/0/0 SET 4.5" HES FAS DRILL BRIDGE PLUG AT 9042'. COMBO MIT TxIA TO 3500 PSI, MIT PASSED. BLEED WELL TO NEAR ZERO. CUT 5.5" TUBING AT 8948' WITH 4.15" SCP POWER CUTTER. ALL DEPTHS REFERENCE TUBING TALLY DATED 31 JAN 1983. WING AND SWAB SHUT, SSV CLOSED AND RETURNED TO PILOT SYSTEM, CASING VALVES OPEN GAUGES, MASTER OPEN. DSO NOTIFIED OF WELL CONDITION. FINAL T/I/O = 150/50/0. ***JOB COMPLETE*** H-20 7/29/2008 T/I/0=150/0/0. Temp=Sl. Assist FB (RWO-prep). Maintain open OA bleed for FB. H-20 7/31/2008 T/IA/OA= SI/150/0 Temp=cold PPPOT-T-T (PASS) PPPOT-IC (PASS) (Pre RWO) PPPOT-T RU 1 HP BT onto THA test void, 0 psi. Flushed void until clean returns achieved, pressured to 5000 psi for 30 minute test, 4950/ 15 minutes, 4900/ 30 minutes. Bled void to 0 psi, Cycled all LDS "Standards" ran out 1.5" and ran in and torqued, all functioned with no problems. PPPOT-IC RU 1 HP BT onto IC test void, 50 psi to 0 psi. Flushed void until clean returns achieved, pressured to 3500 psi for 30 minute test, 3450/ 15 minutes, 3450/ 30 minutes. Bled void to 0 psi, cycled all LDS "Standard" ran out 1.5" and ran in and torqued, all functioned with no problems. H-20 8/2/2008 T/I/0=200/0/0 Circ Out (Pre-RWO) Continued on 08-03-08 AWGRS. Pumped 5 bbls neat methanol and 325 bbls 9.3# NaCI Brine down tubing while taking returns up IA to H-26 flowline. H-20 8/3/2008 ***Continued from 08-02-08 WSR*** Circ, CMIT Tx IA PASSED to 3500 psi (RWO Prep) Pumped remaining 583 bbls 9.3# NaCI brine (908 bbls total) down Tbg thru jet cut, up IA to H-26 flowline. Freeze protect well with 8 bbls of diesel. Pumped 6 bbls diesel down IA to bring pressure up to 3500 psi for CMIT TxIA. TxIA lost 20/20 in 1st 15 mins and 0/0 psi in 2nd 15 mins for a total loss of 20/20 psi in 30 mins. Freeze protected flowline of H-26 per WOA procedure. Bled WHP's to 0 psi. Final WHP's =0/0/0 ***Swab, wing, SSV closed on H-20, Master ,IA ,and OA open on H-20. Swab and Wing closed on H-26*** H-20 8/16/2008 T/I/0=0/0/0; Set 6-3/8" CIW "J" BPV #406 thru tree pre-rig; 1-2' ext. used, tagged @ 108'; (Best/Wortham) H-20 8/25/2008 T/I/O =0/0/0 Pulled 6-3/8" CIW "J" BPV # 406 C~ 90" thru tree,l-3' ext. used...no problems H-20 8/26/2008 T/I/0=0/0/0. Pull 6" CIW J BPV thru ROPE after rig test. Doyon 14. H-20 9/4/2008 T/I/O 0/0/0 Pull 6 3/8 CIW J TWC Thru tree,l-2' Ext Used, TaggedC~108 No Problems on Doy-14. H-20 9/6/2008 T/I/O=Vac/0/0. Pull 6" CIW J TWC thru tree, post rig. 1-2' ext used, tagged C~3 112". No problems. H-20 9/16/2008 ***CONTINUED FROM WSR 09/15/08*** PULLED BALL & ROD FROM 8875' SLM PULLED RK-DGLV FROM STA #2 (5960' SLM) & RKP-DCR FROM STA #3 (3526' SLM) SET RK-LGLV IN STA#3 (3526' SLM) & RK-OGLV IN STA#2 (5960' SLM) PULL RHC BODY FROM 8881' SLM DRIFTED TO 10,010' SLM W/ 3.25" CENT & 3.0" LIB (POSSIBLE PIC OF TBG STUB)) ***LEFT WELL S/I, TURNED OVER TO PAD-OP**** Print Date: 10/1/2008 Page 1 of 1 • • BP EXPLORATION Page 1 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To ~~ Hours Task Code NPT Phase Description of Operations 8/23/2008 20:00 - 00:00 4.00 MOB N WAIT PRE Wait on Rig mats. Clean Pits. -2 ES stuck in road. -Rig down. Ready Rig floor for skid & move. -Ready Rock washer for move. -Empty Enviro-Vac. 8124!2008 00:00 - 08:00 8.00 MOB N WAIT PRE Rig down. 08:00 - 09:00 1.00 MOB P 09:00 - 12:00 3.00 MOB P 12:00 - 15:30 3.50 MOB P 15:30 - 17:30 2.00 RIGU P 17:30 - 18:30 1.00 RIGU P 18:30 - 20:30 2.00 RIGU P 20:30 - 23:00 2.50 RIGU P 23:00 - 00:00 1.00 WHSUR P 8/25/2008 00:00 - 01:00 1.00 WHSUR P 01:00 - 01:30 0.50 WHSUR P 01:30 - 02:30 ~ 1.00 WHSUR ~ P 02:30 - 03:00 I 0.501 WHSUR I P 03:00 - 04:00 I 1.001 WHSUR I P -Wait on mats for move to H-20. -2-ES Broke through road & using all available mats. PRE Skid Rig floor. -RDMO. PRE Move off H-31. -Move down access road. Stage Rig. -Remove mats from access road. PRE Rig staged to remove mats from access road. -Before spotting Rig, remove & transport mats for 7 -ES move. PRE Move & spot Rig over well H-20. -Shim Rig in place. -Berm & spot Rock washer. -Hard line crew spot and berm Bleed tank. -RU hard line. PRE PJSM on skidding Rig floor. -Skid Rig floor. PRE RU service lines to Rig floor: -Air, water, steam & hydraulic lines. PRE While waiting on DSM: -Take on 9.3 ppg NaCI. -Accept Rig 21:00 hrs. -Secure cellar. T /I /O = 0 /140 /0 psi. -Bleed IA to = 0 psi. T/I/O = 0/0/0 -RU to Circulate out 8 bbls of diesel freeze protection. -Load pipe shed w14" D.P. -MOB well equipment to Rig floor. DECOMP PJSM w/ DSM. -RU Lubricator. -Pressure test Lubricator to 500 si / 5 minutes -Pas . DECOMP RD test equipment. -Pull BPV. LD Lubricator. DECOMP PJSM. Test hard line to 100 psi w/air -Pass. -Test hard line w/ water to 3500 psi -Pass. -Pump out freeze protection: -Line up to pump down IA w/ returns up Tbg to Tiger tank. -Reverse in 10 bbls of 9.3 ppg NaCI. -126 gpm / 220 psi. DECOMP Blow down lines. RU to pump down Tbg. -Pump out freeze protection. -Pump 40 bbls of 9.3 ppg NaCI out to Tiger tank. -189 gpm / 440 psi. -Divert 10 bbls out to Rock washer. DECOMP Blow down line. RD circulating equipment. -MOB D rod. -Install TWC. DECOMP gwpment. _Tcef T\N(t frnm ahnvo to 3Ffln nci / in minutes - Pacs Printed: 9/22/2008 12:37:11 PM r: BP EXPLORATION Page 2 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: ~ I NPT .Phase Description of Operations Date From - To ,Hours Task Code 8/25/2008 03:00 - 04:00 1.00 WHSUR P DECOMP - 1 minutes -Pass. -Chart both tests. 04:00 - 04:30 0.50 WHSUR P DECOMP RD test equipment. Blow down injection line. -RD injection line. 04:30 - 06:30 2.00 WHSUR P DECOMP PJSM. -bleed off Adaptor void. -ND McEvoy Tree & Adaptor. -Remove Tree & Adaptor from cellar. -Function all LDS. -Confirm threads on Tbg hanger 7" NSCC - 9 turns. -GL= 33.30'. ULDS = 29.50'. LLDS = 31.30' 06:30 - 10:30 4.00 BOPSU P DECOMP NU: Spacer spool, BOP stack, Choke line, Riser & Flow line. - nsta : urn uc es, iser low line covers. 10:30 - 12:00 1.50 BOPSU P DECOMP Switch Rams: Put 2 7/8" X 5" variables on top. -Put 3 1/2" X 6" on variables bottom. 12:00 - 15:00 3.00 BOPSU P DECOMP Continue to switch Ram positions. -Put 2 7/8" X 5" variables on top. -Put 3 1/2" X 6" on variables bottom. 15:00 - 00:00 9.00 BOPSU P DECOMP PJSM on testing BOP's. ---BOP Configuration: -Hydril GK 13 5/8" 5000. -2 7/8" X 5" Variables. -Blind Rams. -Drilling Spool. -3 1/2" X 6" Variables. -Spacer spool ~ 18" Test BOP and related a ui ment. -Test per BP / AOGCC procedures and regulations. -Test to 250 psi low - 3,500 psi high x 5 min each on chart. -Test Hydril w/ 4" test jt. -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13 &14. -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP. -TIW & Dart valves. -Perform accumulator test. Test witnessed by WSL and Toolpusher. -Beginning of test witnessed by Jeff Jones AOGCC until 2230 hours -Rest of test witness waived by Jeff Jones AOGCC. Starting pressure = 3200 psi Draw down Psi = 1900 psi Note: 39 seconds for 200 psi build up 2 Min & 48 seconds for full PSI 4 bottles X 2200 psi. -Test w/ 4" test Jt. Chart all tests. -Annular remote solenoid shorted out. (Pressure relay for Koomey). -Replace & re-test solenoid. Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 3 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 8/26/2008 00:00 - 04:00 4.00 BOPSU P DECOMP Continue to test BOP equipment. ---BOP Configuration: -Hydril GK 13 5/8" 5000. -2 7/8" X 5" Variables. -Blind Rams. -Drilling Spool. -3 1/2" X 6" Variables. -Spacer spool ~ 18" Test BOP and related equipment. -Test per BP / AOGCC procedures and regulations. -Test to 250 psi low - 3,500 psi high x 5 min each on chart. -Test Hydril w/ 4" test jt. -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13 &14. -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP. -TIW & Dart valves. -Test bottom rams w/ 4" test joint and 5-1/2" test joint. -Perform accumulator test. Test witnessed by WSL and Toolpusher. -Test witness waived by Jeff Jones AOGCC. Starting pressure = 3200 psi Draw down Psi = 1900 psi Note: 39 seconds for 200 psi build up 2 Min & 48 seconds for full PSI 4 bottles X 2200 psi. 04:00 - 06:30 2.50 BOPSU P DECOMP Blow down Kill & Choke lines. -Run in 5 1/2" test Jt. -Rebuild 4" Kill valve in pits. -Test Bottom Rams with 5 1/2" test jt. -Test rebuilt 4" Manual Kill valve in pits. 06:30 - 07:00 0.50 BOPSU P DECOMP RD testing equipment 07:00 - 09:00 2.00 WHSUR P DECOMP -RU lubricator and lubricator extension -Test lubricator to 500 psi x 5 min. Good test. -Pull TWC -RD lubricator and lubricator extension. 09:00 - 10:00 1.00 WHSUR P DECOMP Slip and cut drilling line (59.5') 10:00 - 11:00 1.00 PULL P DECOMP -Blow down choke line. -RU to pull completion: install long bales and 4" elevators. -PU 1 jt 4" DP and MU XOs 11:00 - 11:30 0.50 PULL P DECOMP -Screw into tubing hanger. -BOLDS and MU top drive. -Pull tubin han er to ri floor. Tubin han er ulled loose w/ 185k PUW. String weight ~ 200k after tubing hanger pulled loose (blocks weight 50k). 11:30 - 14:00 2.50 PULL P DECOMP -Pump 40 bbls "Safe Surf O" pill + 50 bbls 9.3 ppg brine + 40 bbls "Safe Scav" pill. -Circulate pills surface-surface w/ 9.3 ppg brine. 336 gpm / 200 psi Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 4 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date from - To Hours Task Code NPT Phase I~, Description of Operations - - -- 8/26/2008 __ 14:00 - 15:00 1.00 PULL P _ DECOMP -LD 4" DP jt and XOs. LD tubing hanger. -Blow down top drive and kill line. -RU compensator and tubing handling equipment (tongs, elevators and slips) to LD 5-1/2" 13Cr80 Vam ACE completion. -RU floor safety valve. 15:00 - 15:30 0.50 PULL P DECOMP Lubricate rig, top drive and blocks 15:30 - 00:00 8.50 PULL P DECOMP Pull and LD 5-1/2" 17# 13Cr80 Vam ACE tubing and completion equipment f/ +/- 8948' to 1648'. -Will inspect tubing for reuse in this same well. 8/27/2008 00:00 - 03:00 3.00 PULL P DECOMP finis a pu ing an 5-1 2" 17# 13Cr80 Vam ACE tubing and completion equipment. -Total LD: 223 tubing joints + 3 space out pups + X-nipple assy + 4 GLMs assy + 20.13' cutoff jt. -Jet cut uniform with flare to 6" OD. 03:00 - 04:00 1.00 PULL P DECOMP -RD tubing handling equipment: tongs, compensator, elevators, long bales. -Clear and clean rig floor. 04:00 - 05:30 1.50 CLEAN P DECOMP -Mobilize BHA tools to rig floor. -Install short bales 05:30 - 06:00 0.50 CLEAN P DECOMP Service drawworks, top drive, blocks and crown. 06:00 - 06:30 0.50 WHSUR P DECOMP Install wear bushing 06:30 - 08:30 2.00 CLEAN P DECOMP -MU dress off BHA w/ 8-1/2" x 5.56" washover shoe + washpipe extensions w/dress off mill inside + boot baskets + 9-5/8" casing scraper. -PU 6 ea. 6-1/4" DCs 08:30 - 16:00 7.50 CLEAN P DECOMP RIH w/dress off BHA on 4" DP 1x1 to 8855'. Work casing scraper around 8863' (est. packer depth) 4 times. 16:00 - 17:30 1.50 CLEAN P DECOMP -Make up top drive and obtain parameters: PUW 195k /SOW 150k / ROTW 170k t n of T hi h Cad 8 5 ' t ~ u ng c Jag i - -Work on top of tubing stub and swallow +/- 12' of stub in washpipe extensions. 385 gpm / 1750 psi, 5k torque. -Dress off top of tubing stub w/dress off mill to 8956'. 385 gpm / 1840 psi. 7k torque. -LD 1 jt 4" DP and PU 4" pup jt (15'). 17:30 - 19:30 2.00 CLEAN P DECOMP -RU to reverse circulate w/ tubing stub swallowed in washpipe extensions. -Reverse circulate hi-vis sweep surface-surface. 271 gpm / 980 psi. -RD circulating equipment and LD 4" pup jt. -Blow down kill line and top drive. -Flow check. 19:30 - 23:00 3.50 CLEAN P DECOMP POOH f/ 8955' to BHA 23:00 - 00:00 1.00 CLEAN P DECOMP -Rack back 6-1/4" DCs -LD dress off tools, boot baskets, casing scraper and bumper sub -Good wear signs on mills. 8/28/2008 00:00 - 00:30 0.50 CLEAN P DECOMP Lubricate blocks, top drive and drawworks. 00:30 - 01:30 1.00 CLEAN P DECOMP Clear rig floor of BHA tools. 01:30 - 02:30 1.00 EVAL P DECOMP -Mobilize Schlumberger equipment to ri4 floo[ -RU a-line equipment and USIT tool. Function test USIT tool. RU air line wiper. 02:30 - 05:30 3.00 EVAL P DECOMP -RIH w/ USIT tool to 3000'. Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 5 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To 'Hours Task ', Code NPT Phase Description of Operations 8/28/2008 02:30 - 05:30 ~ 3.00 EVAL P DECOMP -Run USIT log f/ 3000' 05:30 - 06:00 0.50 EVAL P DECOMP RD Schlumberger a-line 06:00 - 07:00 1.00 DHB P DECOMP -Move DC stands to driller side. -PU and MU 9-5/8" RBP and running tool 07:00 - 08:30 1.50 DHB P DECOMP -RIH to 2200'. -Set 9-5/8" RBP per Baker Rep. (~ 2260' (COE). Top of tool ~ -Rack back one stand. RU to test RBP -Test RBP to 1500 psi x 15 min on chart. Good test. -RD testing equipment. 08:30 - 10:00 1.50 PULL P DECOMP Displace well w/ 9.8 ppg brine in preparation to cut casing and displace out arctic pac. 10:00 - 13:00 3.00 PULL P DECOMP -RU to dump sand -Dump 2200# 20/40 river sand down drill pipe. -PU 90'. Pump 12 s .8 ppg tine own drill pipe ~ 1.5 bpm -Wait 1 hr for sand to settle out -RIH and tag top of sand C~ 2210' 13:00 - 14:00 1.00 PULL P DECOMP w running tool to surface. 14:00 - 14:30 0.50 PULL P DECOMP -LD RBP running tool. -MU casing cutter BHA. 14:30 - 15:30 1.00 PULL P DECOMP RIH w/ casing cutter to 2098' 15:30 - 16:30 1.00 PULL P DECOMP -MU top drive and obtain parameters: PUW 78k /SOW 78k. -Locate collars ~ 2145' and 2186' -Cut casing ~ 2153'. 60 RPM / 3-5k torque, dropping to 0 torque after cut. 176-294 gpm / 340-1050 psi. -Close annular preventer and establish circulation out OA. Got returns out 20" x 13-3/8" annulus through flutes, into cellar box. No returns coming out OA to tiger tank. 16:30 - 18:00 1.50 PULL P DECOMP -Pump down OA obtaining returns through flutes into cellar box. -RU cement line and Little Red to pump diesel down drill pipe. 18:00 - 20:00 2.00 PULL P DECOMP -Little Red pumps 100 bbls diesel @ 110 F down drill pipe w/ annular preventer closed and displace out arctic pac. Returns comin out 20" x 13-3/8" annulus through flutes and into cellar box. No returns going out OA to tiger tank. Keep sucking cellar ox wit vac truc s wring pumping. 1bpm / 800 psi. -Follow diesel w/ 23 bbls hi-vis sweep. 20:00 - 21:00 1.00 PULL P DECOMP Let diesel soak in OA. 21:00 - 22:00 1.00 PULL P DECOMP -Pump 50 bbls 9.8 ppg brine + 40 bbls hi-vis sweep down drill pipe. -Pump 190 bbls 9.8 ppg brine and finish displacing out arctic pac, diesel and sweeps. 264 gpm / 2170 psi FCP. -Returns out 20" x 13-3/8" annulus throw h flutes and into cellar box during all pumping. No returns going out OA to tiger tank. Continue sucking cellar box with vac trucks. 22:00 - 22:30 0.50 PULL P DECOMP -Open annular preventer. Pump 15 bbls 9.8 ppg brine and obtain returns up 4" x 9-5/8" annulus to pits. Observed diesel returns. No returns through fluted hanger out to cellar at this point. -Shut pumps. Wait 5 min for more diesel migration. Pump 10 bbls 9.8 ppg brine until clean returns up 4" x 9-5/8" annulus to pits. Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 6 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task I Code; NPT ~ Phase ! Description of Operations 8/28/2008 22:30 - 23:30 1.00 PULL P DECOMP -Flow check -POOH w/ casing cutter 23:30 - 00:00 0.50 PULL P DECOMP -LD casing cutter BHA -Mobilize casing spear to rig floor. 8/29!2008 00:00 - 00:30 0.50 WHSUR P DECOMP Pull wear bushing. 00:30 - 01:00 0.50 PULL P DECOMP -MU casing spear assy. - o i ize casing equipment to rig floor 01:00 - 02:00 1.00 PULL P DECOMP -RIH w/ spear and engage 9-5/8" casing -Pull -5/8" asin han er to ri floor. Hanger pulled free w/ 145k PUW. PUW 135k after hanger pulled free (blocks weight 50k). -Release spear. 02:00 - 03:00 1.00 PULL P DECOMP RU casing equipment to pull and LD 9-5/8" casing. 03:00 - 11:00 8.00 PULL P DECOMP Pull and LD 9-5/8" 47# L-80 BTC casin .Tight connections. -Total LD: 52 jts + 7.85' cutoff + mandrel hanger -Casing shows no visi a signs o corrosion. 11:00 - 12:00 1.00 PULL P DECOMP -RD casing equipment. -Clear and clean rig floor and pollution pan. -Mobilize tools for casing dress off BHA and 13-3/8" casing scraper to rig floor 12:00 - 12:30 0.50 WHSUR P DECOMP -Install long wear bushing -Finish cleaning rig floor 12:30 - 13:30 1.00 CLEAN P DECOMP MU casin dress off BHA w/ 12-1/8" x 9-5/8" washover shoe, 11-3/4" washpipe extension, 9-5/8" dress off mill (inside extension) and 13-3/8" casing scraper. 13:30 - 15:30 2.00 CLEAN P DECOMP RIH w/ casing dress off BHA and 13-3/8" casing scraper to 2118' 15:30 - 17:00 1.50 CLEAN P DECOMP -MU top drive -Ta to of 9-5/8" casing stub C~3 2153' -Dress off top of 9-5/8" casing stub. 80 RPM / 1-5k torque. 84 gpm / 40 psi. PUW 95k /SOW 95k / ROTW 95k -Circulate hi-vis sweep around. 318 gpm / 220 psi -All returns coming out 20" x 13-3/8" annulus through flutes and into cellar box. Sucking returns f/cellar box with vac trucks. 17:00 - 18:00 1.00 CLEAN P DECOMP POOH f/ 2153' to BHA 18:00 - 19:30 1.50 CLEAN P DECOMP -Rack back 6-1/4" DCs -LD dress off tools and casing scraper. Clear rig floor 19:30 - 20:30 1.00 CLEAN P DECOMP -Mobilize 13-3/8" RTTS to rig floor. -Run 2 stands 6-1/4" DCs w/ mule shoe. MU 13-3/8" RTTS on top of DCs 20:30 - 21:30 1.00 CLEAN P DECOMP -RIH w/ 13-3/8" RTTS. Set RTTS ~ 486' (COE . -Test 13 3/8" casing below RTTS to 2000 psi x 15 min on chart. Good test. 21:30 - 22:30 1.00 CLEAN P DECOMP -POOH w/ 13-3/8" RTTS. -LD RTTS. Rack back 6-1/4" DCs. -Clear rig floor 22:30 - 23:00 0.50 WHSUR P DECOMP Pull wear bushing 23:00 - 00:00 1.00 CASE P DECOMP -Mobilize tools to rig floor: cement head, casing pup jts, ES cementer, centralizers. fiIZt4 run 9-5/8" casing w/ casing patch and ECP: install casing tongs, torque turn equipment and side door elevators. 8/30/2008 00:00 - 01:30 1.50 CASE P DECOMP Finish RU to run 9-5/8" casing w/ casing patch and ECP. 01:30 - 05:00 3.50 CASE P DECOMP -PU 9-5/8" casing patch +ECP assy. MU ES-Cementer on top Printed: 9/22/2008 12:37:11 PM ~ ~ BP EXPLORATION Page 7 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date ~~ From - To ' Hours ~ Task ', Code NPT Phase Description of Operations 8/30/2008 01:30 - 05:00 3.50 CASE P DECOMP of assy. All connections below ES-Cementer are Bakerlocked. -Run 9-5/8" 47# L-80 HYD 563 casin w/ casin atc -ECP assy. and ES-Cementer per running order. Torque turn all connections to 15200 ft-Ibs. -Total jts run: 52 -Install 52 centralizers: 1 in XO jt above ES-Cementer, 1 every jt on jts #1-51. 05:00 - 06:30 1.50 CASE P DECOMP -MU 14.82' pup jt 9-5/8" HYD 563 + 9-5/8" XO HYD 563 x BTC + XO 9-5/8" BTC x 4-1/2" IF + XO 4-1/2" IF x 4" HT38 + 4" DP pup on top of jt #52. -C/O to long bales. MU top drive. -LD power tongs 06:30 - 07:30 1.00 CASE P DECOMP PU pup jt - XOs assy and MU on top of 9-5/8" casing string. MU top drive and torque connections in assy. 07:30 - 08:00 0.50 CASE P DECOMP -Obtain parameters: PUW 140k /SOW 135k. Establish rotation ~ 10RPM. -Rotate down. Tag top of casing stub ~ 2154'. Swallow 3' to 2157' and bottom out in casing patch. Set down 25k~ -PU 50k and slack off 50k. PU total 250k and pull test casin ap tch• -Slack off. 08:00 - 09:30 1.50 CASE P DECOMP -LD XOs assy. Install cement head. PU to 240k (100k overpull). -Pressure test to 1000 psi x 15 min on chart. -Increase pressure to 1900 psi and inflate ECP -Pum u to 2000 si. Hold 2000 six 15 min on char -Increase ressure to 3000 si and open ES-Cementer. Pump 50 bbls warm 9.8 ppg brine 09:30 - 11:00 1.50 CASE P DECOMP Give it to Schlumberger: -Pressure test lines to 4500 psi -Pump 155 bbls 15.8 ppq Class G cement w/ Gasblok f~ 5 b m / 22-114 si -Drop closing plug. Kick w/ 1 bbl cement and 2 bbls water. Line up to rig pumps. -Returns out 20" x 13-3/8" annulus through flutes and into cellar box during pumping. 11:00 - 11:30 0.50 CASE P DECOMP -Displace cement w 8.5 ppg seawater, using rig pumps, C~3 5-7 bpm. -Returns out 20" x 13-3/8" annulus through flutes and into cellar box during displacement. -Observe return of cement to surface out 20" x 13-3/8" annulus into cellar box C~ 117 bbls displaced - low down pumps 10 bbls before bumping plug. Final pump rate 1 bpm ~ 710 psi FCP. -Bump plug, pressure up to 2000 psi and close ES-Cementer. Hold 2000 psi x 5min. -Estimate 20 bls cement to surface. -CIP ~ 11:30 11:30 - 12:30 1.00 CASE P DECOMP -Bleed pressure and ckeck floats. -RD Schlumberger. Blow down cement line -RD cement head. -Blow down lines to stack and vac out landing jt. 12:30 - 14:00 1.50 BOPSU P DECOMP -ND BOP stack and PU same. Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 8 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date ~ From - To .Hours Task Code NPT Phase Description of Operations 8/30/2008 14:00 - 15:00 1.00 WHSUR P DECOMP -Install em ergency slips. -Hang casing on slips w/ 240k (100k overpull /blocks weight 15:00 - 18:00 I 3.001 WHSUR I P 18:00 - 20:00 2.00 BOPSUFj P 20:00 - 22:00 2.00 BOPSU~{ P 22:00 - 23:00 I 1.001 CLEAN I P 23:00 - 00:00 I 1.001 CLEAN I P 8/31/2008 100:00 - 02:30 I 2.501 CLEAN I P 02:30 - 03:30 1.00 CLEAN P 03:30 - 05:30 2.00 CLEAN P 05:30 - 06:30 I 1.001 CLEAN I P 06:30 - 08:00 ~ 1.50 ~ CLEAN ~ P 08:00 - 08:30 0.50 CLEAN P 08:30 - 09:00 0.50 CLEAN P 09:00 - 10:00 ~ 1.00 CLEAN P 10:00 - 10:30 ~ 0.50 ~ CLEAN ~ P 10:30 - 11:30 I 1.00 I CLEAN I P 11:30 - 12:00 0.50 CLEAN P 12:00 - 12:30 0.50 CLEAN P 12:30 - 13:30 1.00 CLEAN P 13:30 - 14:30 1.00 CLEAN P DECOMP -Cut casing w/ Wachs cutter and LD cutoff. Cutoff 18.9' -Install new tubing spool and packoff. Test packoff to 3800 psi x 30 min per Cameron rep. DECOMP NU BOP and choke line DECOMP -RU to test BOP breaks -Test BOP breaks to 250 psi low - 3500 si hi h x 5 min each on chart. Test witnessed by W SL and Tourpusher. -RD testing equipment.. -Install wear bushing. DECOMP -Mobilize BHA tools to rig floor. -MU 8-1/2" bit + 2 boot baskets + bumper sub. DECOMP WOC until it gets 500 psi compressive strength per cement lab test. DECOMP -Cont. WOC until it gets 500 psi compressive strength. Lab test shows 500 psi at 14.23 hrs after CIP. WOC 15 hrs ~ 02:30. -Service top drive, blocks and drawworks. Clean under drawworks. Service iron roughneck. DECOMP -PU 2 stands 6-1/4" DCs. -RIH w/ cleanout BHA to 2061'. Ta cement. DECOMP -Drill out cement f/ 2061'. WOB 10k / 336 gpm ~ 320 psi. 60 RPM -Tag closing plug and ES-Cementer ~ 2121'. -Drill out closing plug and ES-Cementer. -Wash down to 2202' DECOMP Circulate hi-vis sweep surface-surface until clean. 399 gpm / 470 psi. Observe returns of green cement and pieces of rubber~rom closing plug. DECOMP - t~equipment. Close top rams. -Test casing to 3500 psi x 30 min on chart. DECOMP RIH and tag top of sand C~3 2222'. Dry drill f/ 2222' to 2230'. DECOMP Circulate hi-vis sweep surface-surface until clean. 399 gpm / 500 psi DECOMP -Blow down top drive. -POOH to BHA DECOMP -Rack back 2 stands 6-1/4" DCs -LD 8-1/2" bit and boot baskets. Clean boot baskets: brass pins and aluminum pieces from ES-Cementer. -Mobilize tools for next BHA to rig floor DECOMP -RU testing equipment. Close blind rams. -Test casing to 3500 psi x 30 min on chart. -RD testing equipment. DECOMP MU BHA w/ RCJB + 2 boot baskets + 9-5/8" casing scraper. on sans -1/4" DCs. DECOMP Lubricate rig. Inspect top drive. DECOMP RIH on 4" DP to 2200' DECOMP -MU top drive. Tap toa of sand C~ 2230'. -Dry drill 2'. Break circulation and wash with RCJB to 2240'. -Pump hi-vis sweep surface-surface until clean. 405 gpm / Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 9 of 12 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: ell Name: e: Name: From - To H-20 H-20 WORKO DOYON DOYON Hours VER DRILLIN 14 Task INC Code . NPT Start Rig Rig Phase Spud Date: 1/31/1983 : 8/24/2008 End: Release: 9/4/2008 Number: Description of Operations 8/31/2008 13:30 - 14:30 1.00 CLEAN P DECOMP 2500 psi. 14:30 - 15:30 1.00 CLEAN P DECOMP POOH f/ 2240' to BHA 15:30 - 17:00 1.50 CLEAN P DECOMP LD 6-1/4" DCs, bumper sub, casing scraper, boot baskets and RCJB. Clean RCJB: aluminum piece from ES-Cementer. 17:00 - 17:30 0.50 CLEAN P DECOMP -Clear rig floor. -Mobilize RBP retrieving tool to rig floor. -MU RBP retrievin tool. 17:30 - 18:30 1.00 CLEAN P DECOMP RIH to 2240'. Tag top of sand. 18:30 - 21:00 2.50 CLEAN P DECOMP -Wash down w/ RBP retrieving tool to top of RBP ~ 2256'. 210-520 gpm / 110-420 psi. -Pump hi-vis sweep surface-surface. 460 gpm / 460 psi. -Latch onto RBP and open bypass. CBU ~ 210 gpm / 130 psi. -Unseat RBP. 21:00 - 22:30 1.50 CLEAN P DECOMP POOH w/ RBP. 22:30 - 23:00 0.50 CLEAN P DECOMP -LD RBP and retrieving tool. -Clear rig floor 23:00 - 00:00 1.00 BOPSU P DECOMP -Pull wear ring. -RU to test BOP. 9/1/2008 00:00 - 00:30 0.50 BOPSU P DECOMP -Finish RU to test BOP. -Change quick connect on test pump. 00:30 - 04:30 4.00 BOPSU P DECOMP Test BOP and related equipment per BP / AOGCC procedures and regulations. Test to 250 psi low - 3500 psi high x 5 min each on chart. Test annular preventer to 250 psi low - 3500 psi high x 5 min each on chart. Test components w/ 4" test jt. Test bottom rams w/ 4" and 5-1 /2" test jts. Test witnessed by WSL and Tourpusher. Chuck Scheve, AOGCC Rep, waived witness of test. -Perform koomey test: 1. System Pressure: 3200 psi 2. Pressure after close: 1900 psi 3. 200 psi attained at 30 sec 4. Full pressure attained at 2 min 38 sec 5. Nitrogen bottles: 4 x 2200 psi avg. -Tested 29 components: 1.13-5/8" annular 2. 2-7/8" x 5" VBR (upper rams) 3. Blind rams 4. 3-1/2" x 6" VBR (lower rams) 5. HCR valves (kill and choke) 6. Manual valves on kill line and choke line 7. Choke manifold valves (14) 8. Manual choke and hydraulic choke 9. Inside BOP, FOSV (ball type), Upper and Lower kelly valves (upper and lower top drive IBOP) 04:30 - 05:30 1.00 BOPSU P DECOMP -RD testing equipment. -Blow down top drive, choke line and kill line. -Install wear bushing. 05:30 - 06:00 0.50 FISH P DECOMP Mobilize tools for next BHA to rig floor. 06:00 - 08:30 2.50 FISH P DECOMP MU BHA w/ 3-5/8"junk mill + 8-1/8" Shear Pin Guide Assy + 5 jts 2-7/8" PAC DP. -RIH on 1 stand 4" DP. 08:30 - 09:30 1.00 FISH P DECOMP -Slip and cut drilling line (59.5') -Service and inspect top drive, blocks, crown and draw works. Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Event Name: WORKOVER Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date. 'From - To Hours ~ Task Code NPT 9/1/2008 09:30 - 12:00 2.50 FISH P 12:00 - 12:30 0.50 FISH P 12:30 - 13:30 1.00 FISH P 13:30 - 15:30 2.00 FISH P 15:30 - 16:30 1.00 FISH P 16:30 - 17:30 ~ 1.00 ~ FISH ~ P Page 10 of 12 Spud Date: 1 /31 /1983 Start: 8/24/2008 End: Rig Release: 9/4/2008 Rig Number: Phase Description of Operations DECOMP RIH f/ 275' to 8431'. DECOMP Lubricate rig and inspect top drive. DECOMP Cont. RIH to 8950' (top of tubing stub C~ 8956') DECOMP Displace well w/ 8.5 ppg seawater. 345 gpm / 2600 psi. DECOMP -Work guide on top of tubing stub ~ 8956'. -Shear pins and enter tubing stub w/ 2-7/8" PAC DP. T~ Fasdrill ~ 9046'. -Mill Fasdrill until•free. 60 RPM / 4-7k torque. 123 gpm / 310 psi. 146k / ROTW 162k. DECOMP -Push Fasdrill remnants to 9100'. Fasdrill to bottom. Pressure up to 1300 psi w/ 17:30 - 21:00 ~ 3.50 ~ FISH P 21:00 - 00:00 3.00 FISH P 9/2/2008 00:00 - 02:00 2.00 FISH P 02:00 - 06:00 4.00 FISH P 06:00 - 06:30 0.50 FISH P 06:30 - 08:30 2.001 FISH ~ P -Bleed pressure. Open annular preventer. DECOMP POOH to BHA to add more jts of 2-7/8" PAC DP and push Fasdrill remnants to bottom. DECOMP Stand back / LD BHA to Shear Pin Guide Assy. Redress shear pins. DECOMP PU 40 jts 2-7/8" PAC DP, XOs and bumper sub. DECOMP RIH on 4" DP f/ 1261' to 8945'. DEGOMP -MU top drive and obtain parameters: PUW 173k /SOW 145k / ROTW 157k. 10 RPM / 2k torque. -Tag top of tubing stub C~ 8956'. Work guide on tubing stub and enter w/junk mill and 2-7/8" PAC DP. -Wash down in tubing stub to 9037' DECOMP -Cont. washing down in tubing stub on 4" DP stands f/ 9037' to 9599'. 126 gpm / 500 psi -Cont. RIH on 4" DP 1x1 f/ 9599' to 10011'. Tag Fyasdrill remnants ~ 10011'. -Work on top of Fasdrill w/ sunk mill. Junk mill jets plugged 08:30 - 09:30 1.001 FISH ~ P 09:30 - 12:00 2.50 FISH P 12:00 - 12:30 0.50 FISH P 12:30 - 16:30 4.00 FISH P 16:30 - 19:30 3.00 FISH P 19:30 - 20:30 ~ 1.00 ~ FISH ~ P 20:30 - 22:00 1.50 22:00 - 00:00 I 2.00 DECOMP -POH f/ 10011'to 9504'. -MU top drive. Unplug jets and verify circulation @ 126 gpm / 500 psi. -Check with town for next operations. DECOMP POOH and LD 4" DP to pipe shed f/ 9504' to 5523' DECOMP Lubricate rig. Inspect top drive. DECOMP Cont. POOH and LD 4" DP to pipe shed f/ 5523' to BHA DECOMP -LD 2-7/8" PAC DP to pipe shed (40 jts). -LD rest of BHA DECOMP -Pull wear bushing. -Clear rig floor of BHA tools. RUNCMP -RU to run 5-1/2" 13Cr80 Vam Top HC tubing and completion: install long bales, elevator, compensator and single joint elevator. Install power tongs and torque turn equipment. -Mobilize tubing hanger to rig floor. MU XOs to floor valve. RUNCMP -PU and RIH Unique Overshot assy. PU 5-1/2" 17# 13Cr80 Vam Top HC full tubing jt (w/ Bakerloked collar) and Bakerlok pin. Attempt to MU connection. Unable to reach optimum torque due to malfunctioning power tong. -Break connection. Clean Bakerlok off collar on Unique Printed: 9/22/2008 12:37:11 PM BP EXPLORATION Page 11 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT ~ Phase I' Description of Operations 9/2/2008 22:00 - 00:00 2.00 BUNCO RUNCMP Overshot assy. Bakerlok on pin of full jt. set before cleaning it. -LD full jt. and replace. C/O power tongs. 9/3/2008 00:00 - 00:30 0.50 BUNCO RUNCMP -Lubricate rig and inspect top drive. -Finish C/O power tongs. 00:30 - 11:30 11.00 BUNCO RUNCMP -PU replacing 5-1/2" 17# 13Cr80 Vam Top HC full jt. Bakerlok pin and MU to optimum torque on Unique Overshot assy. -Buck off collar in replacing full jt. Bakerlok and buck up again. Bakerlok pin in X nipple assy and MU to full jt to optimum torque. -Cont. MU S-3 packer and upper X nipple assy. Bakerlok connection. below packer. -Cont. running 5-1/2" 17# 13Cr80 Vam Top HC tubing and completion equipment. Torque turn all connections to 6580 ft-{bs (optimum make up torque). Run 211 jts to 8952' 11:30 - 13:30 2.00 BUNCO RUNCMP PU jt # 212 -Tag 5 1/2" tubino stub at 8956- -Attempt to work over stub w/ no success -Put 1/2 turn right & set down 15k -Put 1/2 turn right and set down -RU circ. head -Break circ, w/ 3 bpm 80 psi -Work over stub and observe 80 psi increase -Observe shear at 8960' and 8968' -Set down 30k on no-go at 8969' O.S. guide depth. -PUW 190k /SOW 158k (blocks weight 50k). 13:30 - 14:30 1.00 BUNCO RUNCMP RD circ. head and lines -LD joints # 212, 211 and 210 14:30 - 15:30 1.00 BUNCO RUNCMP PU space out pups (9.80' & 9.84') -PU joint # 210 -PU hanger w/ XO and pup -PU XO's and joint of 4" DP (landing joint) 15:30 - 16:30 1.00 BUNCO RUNCMP Lower hanger and work over stub at 8956' -Taking weight at 8959' -Work up and back down gaining 2' -RU and circ. down to 8964' O.S. guide depth -Land hanger - RILDS 16:30 - 21:00 4.50 BUNCO RUNCMP RU to reverse circ. clean seawater and corrosion inhibitor -Pressure up to 500 psi -Unable to reverse circ. -Bleed off pressure. Establish circulation pumping down tubing and taking returns out IA. -Circulate w/ 120 bbls clean seawater + 280 bbls clean seawater c/ corrosion inhibitor + 205 bbls clean seawater. 126 gpm / 260 psi 21:00 - 23:30 2.50 BUNCO RUNCMP -Dro ball-and-rod. Pressure up tubing to 3500 psi. Set oacker. Hold pressure in tubing ~ 350 psi x min on chart. -Bleed tubing pressure to 1500 psi. Pressure up IA to 3500 ps x 30 min on chart. MIT-IA good. -Bleed off tubing. Observe shear valve open C~3 900 psi tubing pressure (2600 psi pressure differential f/ IA). Continue bleeding off all pressures. -Pump down IA through shear valve ~ 126 gpm / 380 psi. -Pump down tubing through shear valve ~ 126 gpm / 240 psi. Printed: 9/22/2008 12:37:11 PM ~~ ~~ BP EXPLORATION Page 12 of 12 Operations Summary Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/24/2008 End: Contractor Name: DOYON DRILLING INC. Rig Release: 9/4/2008 Rig Name: DOYON 14 Rig Number: Date From - To I Hours Task j Code NPT Phase Description of Operations 9/3/2008 23:30 - 00:00 0.50 WHSUR P RUNCMP -LD landing joint and XOs. -Cameron Rep dry rod TWC. 9/4/2008 00:00 - 00:30 0.50 WHSUR P RUNCMP Inspect top drive. Lubricate rig. 00:30 - 02:30 2.00 WHSUR P RUNCMP -Test TWC f/ above to 3500 psi x 10 min on chart. Test f/ below to 1000 psi x 10 min on chart. -RD testing equipment -Blow down choke and kill lines. 02:30 - 05:30 3.00 BOPSU P RUNCMP -Clean rig floor mats and pollution pan. -ND BOP, flow line, riser and choke line. 05:30 - 09:30 4.00 BOPSU P RUNCMP -Pull ram blocks f/ top ram, blind ram and bottom ram bodies. -Clean ram cavities. -Set stack on rack 09:30 - 12:00 2.50 WHSUR P RUNCMP -NU adapter flange. -Test adapter flange to 5000 psi x 30 min per Cameron Rep. -NU tree 12:00 - 14:00 2.00 WHSUR P RUNCMP -Cont. NU tree and RU lines to tree. -Fill tree w/diesel. Test tree w/diesel to 5000 psi x 10 min on chart. 14:00 - 15:00 1.00 WHSUR P RUNCMP -RU DSM lubricator on tree. -Test lubricator to 500 psi x 5 min on chart. -Pull TW -RD lubricator 15:00 - 16:30 1.50 WHSUR P RUNCMP -RU Little Red Services. Test lines to 3500 psi. -Pump 140 bbls diesel (freeze protect) down IA, taking returns out tubing. 3 bpm / 750 psi 16:30 - 18:00 1.50 WHSUR P RUNCMP -Jump IA to tubing. -Let diesel U-tube. 18:00 - 19:30 1.50 WHSUR P RUNCMP -Cameron Rep. dry rod BPV. -Test a ow o psi x 10 min on chart. Use diesel w/ Little Red Services for test. 19:30 - 21:00 1.50 WHSUR P RUNCMP -Suck back all lines. RD Little Red Services. -RD lines to tree and pump in flanges. Remove secondary valve on IA. Install blinds and gauges. -Secure tree. -OA=O psi / IA=O psi / TBG= 0 psi. 21:00 - 00:00 3.00 RIGD P POST -RD rig floor. -Skid rig floor to moving position. -Release rig for move in same pad for maintenance. Printed: 9/22/2008 12:37:11 PM 09/18/08 ~~ Schlumberg~r Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh !k eN~~~L~~~~ ~~~ ~ ~.~ ~~i~~ ~ .... ne ..s:.. N0.4887 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 n~a~ m n_~_- M-04 11978480 MEM GRADIOMANOMETER LOG ~ •~ 08/25/08 1 1 14-32 12031498 LDL 07/29/08 1 1 H-20 1 f 96262f USIT j- ~- L~ 08/28/08 1 1 3-35/L-36 11999039 INJECTION PROFILE ~ T 09/04/08 1 1 3-37/L-35 11970845 FLUID LEVEL DETERMINATIONU ~ X51 09/07/08 1 1 3-37/L-35 11968960 PRODUCTION PROFILE G 08/30/08 1 1 NK-38A 12017515 SBHP SURVEY ~ ~ _ 6. ~ 09/02/08 1 1 L-215 12031512 INJECTION PROFILE s ~;~' ''~ ~ 09/03/08 1 1 B-05B 12096914 MCNL 08/17/08 1 1 L-205L3 ~ 40016965 OH MWD/LWD EDIT 06/21/08 2 1 ,~ ~ fv ~,. .v vr~c a.vr r chain ~ v: BP Exploration (Alaska) Inc. ? .~. ~,„~ - - ~ _ ~... Petrotechnical Data Center 1R2-1 900 E. Benson Blvd. f*., ~ r~ ~ Anchorage, Alaska 99508 xa .... y C~ E~'(f ~i y Date Delivered: ,ll, Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 8 ATTN: Beth ~ Received by: i~.i • • • • SARAH PALIN, GOVERNOR t1~~T~~+ P s7~ ~ 333 W. 7th AVENUE, SUITE 100 ~is7~~'~A1li®it ~® ~'~'j ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 David Reem Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, AK 99519-6612 ~ ~ _ d (~ Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU H-20 Sundry Number: 308-280 Dear Reem: ~~~~~~ A~iG :~. ~t 2008 Enclosed is the approved Application for .Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ~~, ~ ~ y ~/ Daniel T. Seamount, Jr. Chair DATED this day of August, 2008 Encl. p~ '1/ STATE OF ALASKA 'L'o8 .~ ,~ ALA OIL AND GAS CONSERVATION COM~ION F~lf~ APPLICATION FOR SUNDRY APPROVAL It® ~°~= 20 AAC 25.280 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension ® Alter Casing ®Repair Well ~ ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well , ^ Change Approved Program ®Pull Tubing - ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ® Development ~ ^ Exploratory 183-007 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20896-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU H-20 - Spacing Exception Required? ^ Yes ®No 9. Property Designation: Q~ 10. KB Elevation (ft): 11. Field /Pool(s): ADL 02828'$ _ -p~ 80.20 ' , Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10330 9242 10287 ~ 9204 ' 9047 None Casin Len th Size MD TVD Burst Colla se Structural C nductor 110' 20" x 30" 110' 110' Surface 2692' 13-3/8" 2692' 4930 2670 Intermediate Production 9457' 9-5/8" 9457' 8476' 6870 4760 Liner 1104' 7" 9224' - 10328' 8277' - 9241' 7240 5410 Scab Liner 1166' 4-1/2" 9044' - 10210' 8122' - 9136' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9800' - 10098' 8776' - 9037' S-1/2", 17# x 4-1l2", 12.6# 13Cr80 / L-80 9058' Packers and SSSV Type: 9-5/8" x 5-1 /2" Baker S-3 Packer Packers and SSSV MD (ft): 8999' 9-5/8" x 5-1 /2" Baker ZXP packer with tieback sleeve 9052' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Detailed Operations Program ^ Exploratory ®Development ^ Service 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: August 24, 2008 ®Oil ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Paul Chan, 564-5254 Printed Name a 'd Reem Title Engineering Team Leader Prepared By NamelNumber: Signature Phone 564-5743 Date $~tf Dg Sondra Stewman, 564-4750 Commission Use OnC Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ~~ ~ ~ ~~~ ^ Plug Integrity LOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: ~~ lJ ~~d ~ '~,~ ~~ \/ ~C'~`i~ Subsequent Form Required: ~--~'~ ~ ~ APPROVED BY A roved B COMMISSIONER THE COMMISSION Date ®®® Form 10-403 0~200~ Submit In Duplicate .,.y' ~` ~ ! S ~F~.: BUG ~ ~ 2008 i -~,~ L 9~ ~j €~~ 7G~~i8 ::`'~ • • by Gl'Gresiry H-20 Expense Rig Workover Scope of Work: Pull 5-'h" completion, cut and pull 9-$/8" casing, run and cement 9-5/8" casing to surface, run 5-'h" 13Cr-80 tubing with Baker S-3 packer set at 8850' MD. MASP: 2310 psi Well Type: Ivishak Producer Estimated Start Date: August 24, 2008 Production Engineer: Chris Zamora Intervention Engineer: Paul Chan Pre-rig prep work: S 1 Drift 4-~/z" and 5-'/2" tubing for Power Jet cut and setting FasDrill. Pull PXN plug at 9047 M D. E 2 Set 4-~/z" FasDrill at 9037' MD, in the middle of the 20' pup joint below the packer. Fluid-pack wellbore and CMIT TxIA to 3500 psi. Power Jet cut 5-'/z" 13Cr-80 tubing at 8948' MD, in the middle of the first full joint above the Baker packer. Reference tubing tall dated 8/09/02. F 3 Circulate well with 9.3 ppg brine and leave a 100' diesel cap thru the cut. No MIT-OA re uired due to SC leak. W 4 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breaka a check one at a time . PPPOT-T & IC. W 5 Set a BPV in the tubin han er. O 6 Remove the wellhouse & flow line. Level the ad as needed for the ri . Proposed Procedure 1. MIRU workover rig. ND tree. NU and test BOPE pipe rams to 3500 psi. Test annular preventer to 3500 psi. Circulate out freeze protection fluid and circulate well to clean seawater through the cut. 2. Retrieve 5-'/z" tubing string down to the packer. 3. Run USIT log to determine top of cement in the 9-5/8' casing. 4. Set and test 9 5/s°' RBP approximately 100' below estimated TOC. Note: The VBRs in the BOPs will~~~ NOT be changed over to 9-5/a" pipe rams as the barriers to the reservoir will be the tested 9 5/e" RBP and FasDrill plug in the tubing tail. 5. Cut and pull 9-g/8" above TOC. 6. Run and fully cement 9 5/e°' casing to surface. 7. Drillout 9 5/e" shoe track. 8. Retrieve 9 5/" RBP. 9. Run 5-'/z" 13Cr-80 tubing with Baker S-3 packer set at 8850' MD. 10. Displace the IA to packer fluid and set the packer. 11. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD. 12. Set BPV. ND BOPE. NU and test tree. RDMO. TREE = 6" MCEV OY WELLHEk~D = MCEVOY HCTUATOR = OTIS KB. ELEV = 80.2' BF. F1EV = 45.05' KOP = 3000' Max Angle = 36 @ 4100' Datum MD = 9919' Datum TV D = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 26 Minimum ID = 3.725" @ 9047' 4-1/2" HES XN NIPPLE PERFORATION SUMMARY REF LOG: SWS-BHCS ON 02/10/83 ANGLE AT TOP P6ZF: 29 @ 9800' Note: Refer to ProducFion DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9800 - 9812 S 05/08/93 3-3/8" 4 9944 - 10032 S 10/09/86 2-7/8" 6 10022 - 10032 C 10/12/02 3-1/8" 4 10044 - 10098 S 08/19/02 2-1/2" 5 10060 - 10075 C 03/14/03 2-7/8" 6 10075 - 10098 C 10/12/02 2-112" 5 10079 - 10098 C 03/14/03 )9-5/8" X 5-1/2" BKR S-3 PKR, ID = 4.75" ~ / 9026' 4-1 /2" HES X NIP, ID = 3.813" 5-1/2" TBG, 17#, 13-CR •0232 bpf, ID = 4.892 9003' 9047' 4-1/2" OTIS XN NIP, ID = 3.725" 9047' - 4-1/2" PXN PLUG (07/07/07) 9052' 9-5/8" X 5-1/2" BKR ZXP PKR W/ TIEBACK SLV TOP OF 7" LNR 9224' 9058' 4-1/2" WLEG, ID = 3.958" 90$4' ELMD WLEG (10/12/02) 9-5l8" CSG, 47#, L-80, ID = 8.681" H 9457' L 4-1 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~ 10210' PBTD 10287' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 10328' 1 LANDING COLLAR (ESTIMAT® pBTp} 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 12/24/84 ORIGINAL COMPLETION 07/21/07 SWGPJ SET PXN RUG (07/07/07) 08/19/02 JDMIKK RWO 10/12/02 TMNIKK ADPERFS; ELMD WLEG 10/04/02 SDF/KK GLV GO 10/17/02 MWKAK GLV GO 03/14/03 PWE/TLH ADPERFS PRUDHOE BAY UNff WELL: H-20 PERMIT No: 1830070 API No: 50-029-20896-00 SEC 21, T11 N, R13E, 479.9' FNL, 1735.6' FEL BP 6cploration (Alaska) H _~ 0 S OTES: 5-1 @" CHROME TBG. ~ 5-1/2" HES. X NIP, ID = 4.562" ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3609 3576 25 FMHO DOME RK 16 10/17/02 3 6711 6116 36 FMHO SO RK 20 10/17/02 2 8084 7284 29 FMHO DMY RK 0 08!19/02 1 8905 8001 29 FMHO DMY RK 0 08/19/02 )5-1/2" HES XN NIP, ID = 4.455" ~ EE = 6" MCEV OY WELL D = MCEVOY A J11J -TOR = . OTIS KB. ELEV = 80.2' BF. ELEV = 45.05' KOP = 3000' Max Angle = 36 @ 4100' Datum MD = 9919' Datum TVD = 8800' SS H-~ Proposed Comp~tion Surface Top of Cement -2100 5-1/2" HES X NIP, ID = 4.562" .`~ GAS LIFT MANDRELS 13-3/8" CSG, 72#, L-S0, ID = 12.347" ~- 5-1/2" TBG, 17#, 13-CR .0232 bpf, ID = 4.892" - PERFORATION SUMMARY REF LOG: SWS-BHCS ON 02/10/83 A NGLE AT TOP PERF: 29 @ 9800' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 9800 - 9812 S 05/08/93 3-3/8" 4 9944 - 10032 S 10/09/86 2-7/8" 6 10022 - 10032 C 10/12/02 3-1/8" 4 10044 - 10098 S 08/19/02 2-1/2" 5 10060 - 10075 C 03/14/03 2-7/8" 6 10075 - 10098 C 10/12/02 2-1/2" 5 10079 - 10098 C 03/14/03 5-1/2" TBG, 17#, 13-CR .0232 bpf, ID = 4.892" Minimum ID = 3.725" @ 9047' 4-1/2" HES XN NIPPLE TOP OF 7" LNR I-I 9224' 9-5/8" CSG, 47#, L-80, ID = 8.681" I--I 9457' 4-1 /2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" PBTD 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I 10210' F 10328' ST MD TV D DEV TYPE V LV LATCH PORT DATE 4 3609 3576 25 FMHO DOME RK 16 10/17/02 3 6711 6116 36 FMHO SO RK 20 10/17/02 2 8084 7284 29 FMHO DMY RK 0 08/19/02 1 8905 8001 29 FMHO DMY RK 0 08/19/02 H 5-1/2" HES XN NIP, ID = 4.455" I -8850 9-5/8" X 5-1/2" BKR S-3 PKR ID = 4.75" 5-1/2" HES XN NIP, ID = 4.455" Unique Machine Overshot 8978' 5-1/2" HF~ XN NIP, ID = 4.455" 8999' H9-5/8" X 5-1/2" BKR S-3 PKR, ID = 4.75" 9004' 5-1/2" X 4-1/2" XO, ID = 3.870" 9026' 4-1/2" HES X NIP, ID = 3.813" 9047' 4-1/2" OTIS XN NIP, ID = 3.725" 91 052' I 9-5/8" X 5-1/2" BKR ZXP PKR W/ TIEBACK SLV 9058' 4-1/2" WLEG, ID = 3.958" 9054' -{ELI WLEG (10/12/02) DATE REV BY COMMENTS DATE REV BY COMMENTS 12/24/84 ORIGINAL COMPLETION 07/21/07 SWGPJ SET PXN PLUG (07/07/07) 08/19/02 JDIWKK RWO 10/12/02 TMNlKK ADPERFS; ELMD WLEG 10/04/02 SDF/KK GLV GO 10!17/02 MHJKAK GLV GO 03/14/03 PdVFJTLH ADPERFS PRUDHOE BAY UNIT WELL: H-20 PERMfT No: 1830070 API No: 50-029-20896-00 SEC 21, T11 N, R13E, 479.9' FNL, 1735.6' FEL BP 6cploration (Alaska) H-20 (PTD #1830070) Failed MIT-OA - SC Leak . All, Well H-20 is a natural flow producer that has been identified with a rising wellhead. A recent a MIT-OA w/N2 was performed to diagnose the condition of the surface casing. The test failed on 06/13/07 and as a result the status of the well has been changed from "Operable" to "Not Operable." The well must remain shut in until the surface casing leak is mitigated. The current plan ./ forward is to perform a TIFL to evaluate the condition of the tubing. Following the evaluation of the tubing we will have to diagnose a plan to mitigate the surface casing leak before we can put the well back on production. Please call if you have any questions or concerns. Thank you, Paul Austin for Anna Dube We/llntegrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 :);CANNED JUN ~ 6 2007 From: Holt, Ryan P (ASRC) Sent: Thursday, June 14, 20079:58 AM To: NSU, ADW Well Integrity Engineer Cc: Austin, Paul A Subject: H-20 Failed MIT-OA Paul, See failed MIT-OA wi N2. Recommend sending out notice to Trouble well & continue with TIFL to eval tubing integrity. ~yan Hoft BPAlaska Wens Group \Ve11 Site Leader 907.659.5098 Officc 943.5(128 Cell 1 of! 6/18/20073:17 PM ...... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging_ RE-PERF Pull tubing _ Alter casing _ Repair well _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 5. Type of Well: Development __X Exploratmy__ Stratigraphici Sewicei 4. Location of well at surface 480' FNL, 1736' FEL, Sec. 21, T11N, R13E, UM At top of productive intewal 2448' FNL, 742' FEL, Sec. 16, T11N, R13E, UM At effective depth 2252' FNL, 606' FEL, Sec. 16, T11N, R13E, UM At total depth 2167' FNL, 556' FEL, Sec. 16, T11N, R13E, UM (asp's 642836, 596029% · . (asp's 643759, 5963629) (asp's 64389O, 5963827) (asp 's 643939, 5963913) 12. Present well condition summary Total depth: measured true vertical 10328 feet 9241 feet Plugs (measured) Perforate _X Other _ 6. Datum elevation (DF or KB feet) RKB 80 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number H -20 9. Permit number / approval number ~ 183-007 10. APl number 50-029-20896-00 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool Tagged TD @ 10116' (01/29/2003). Effective depth: measured 10116 feet true vertical 9053 feet .Caaing Conductor Surface Intermediate ·Liner Scab ·Liner Length 110' 2657' .9422' 1104' 1 i58' Junk (measured) Size Cemented 20" 72 cf 1.3-3/8!' 3720 cf 9-5/8" 1452 cf 7" 302 cf 4-1/2" Cemented Scab Liner Cement from 9052'-10210' (08/2002) Measured Depth 145' 2692' 9457' '9224'-10328' 9052'-10210'. True Ve~icalDepth 145' 2692' 8475' 8276'-9240' 8129'-9136' Perforation depth: measured Open Perf' 10022"10031" 10060"10098' RECEIVED Sqzd ·Perfs behind Scab Liner 9800'-9812', 9944'-10022', 10044'-10060' Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) : true vertical Open Perfs 8970'-8978', 9004'-9037' MAR 2 8 Z003 Sqzd' Perfs behind Scab Liner 8776'-8786', 8902'-8970', 8990'-9004' 5-1/2", 17#, 13-CR, TBG @ 9003' MD. 5-1/2" x 4-1/2" XO @ .4-1/2", 12.6#, 13-CR, TBG @ 9058' MD. 9-5/8" x 5-1/2" BKR S-3'PKR @ 8999'. 9-5/8" x 5-1/2" BKR ZXP PKR w/Tieback SLV @ 9052'. 5-1/2" HES X Nipple @ 2i82' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. RepreSentative Daily Averaoe Production or Iniection Data Prior to well operation 03/11/2003 Subsequent to operation 03/16/2003 · . OiI-Bbi Gas-Md Water-Bbl Casing Pressure Tubing Pressure 802 1' 5008 42 1222 1019 18744 49 1165 15. Attachments Copies of Logs and SurVeys run _ Daily Report of Well Operations _ 16. Status of well classification as: Oil IX Gas __ Suspended __ Service I17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title: Technical Assistant --. 'DeWavne R. Schrr0rr ~ Form 10-404 Rev 06/15/88 I BDN$ BFL O,R. IGINAL Date Mamh 19, 2003 Prepared by DeWayne R. Schnorr 564-5174 '. SUBMIT IN DUPLICATE H-20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/29/2003 PERFORATING: DRIFT/TAG 03/14/2003 PERFORATING: PERFORATING 03/15/2003 TESTEVENT --- BOPD: 1,299, BWPD: 62, MCFPD: 19,465, AL Rate: 0 EVENT SUMMARY 01/29/03 <<< WELL FLOWING UPON ARRIVAL >>> DRIFTED W/2.5" X 10' DUMMY GUN & TEL. TAGGED TT @ 9039' SLM + 15'= 9054' ELM. TAGGED BOTTOM @ 10101' SLM + 15' = 10116' CORRECTED. (SAMPLE BAILER CAME BACK W/ SMALL ROCKS AND DIRT). 18' OF RAT HOLE. <<< TURNED WELL OVER TO PAD OP TO POP >>> 03/14/03 PERFORATED 10,060-10,075 AND 10,079-10,098 (BHCS- 10 FEB 83) WITH 2.5" POWER-SPIRAL ENERJET GUNS, 5 SPF, 45 DEG PHASE. SHUT IN WELL, RIH&SHOOT 19-FT GUN, RIH&SHOOT 15-FT GUN. NO DRAW DOWN BEFORE SHOOTING.. SET DOWN NEAR MIN ID (9047') ON BOTH RIH. WORKED THRO.UGH AFTER 5 MIN. TAGGED TD @ 10,119' MD ON FIRST RIH. DID NOT TAG TD ON SECOND RIH. LEFT WELL SHUT IN, REQUESTED PAD OPERATOR POP WELL AND PLACE IN TEST. 03/15/03 TESTEVENT --- BOPD: 1,299, BWPD: 62,. IVlCFPD: 19,465, AL Rate': 0 .. Fluids Pumped BBLS 3 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH 'DIESEL ( 2 TESTS). 3' TOTAL ' RE-PERFS 03/14/2003 THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2-1/2" POWER-SPIRAL ENERJET, 5 SPF, 45 DEGREE PHASING, RANDOM ORI. ENTATION. 10060' - 10075' 10079' - 10098' Page I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging_ Perforate_X RE-PERF Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__X RKB 80 feet 3. Address Explorato~___ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 480' FNL, 1736' FEL, Sec. 21, T11N, R13E, UM (asp's 642836, 5960299) H-20 At top of productive interval 9. Permit number / approval number 2448' FNL, 742' FEL, Sec. 16, T11N, R13E, UM (asp's 643759, 5963629) 183-007 At effective depth 10. APl number 2183' FNL, 565' FEL, Sec. 16, T11 N, R13E, UM (asp's 643930, 5963897) 50-029-20896-00 At total depth 11. Field / Pool 2167' FNL, 556' FEL, Sec. 16, T11 N, R13E, UM (asp's 643939, 5963913) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10328 feet Plugs (measured) true vertical 9241 feet Effective depth: measured 10287 feet Junk (measured) Scab Liner Cement from 9052'-10210' (08/2002) true vertical 9204 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" 72 cf 145' 145' Surface 2657' 13-3/8" 3720 cf 2692' 2692' Intermediate 9422' 9-5/8" 1452 cf .9457' 8475' Liner 1104' 7" 302 cf 9224'-10328' 8276' - 9240' Scab Liner 1158' 4-1/2" Cemented 9052' - 10210' 8129' - 9136' Perforation depth: measured Open Perfs 10022'-10031', 10075'-10098' Sqzd Perfs behind Scab Liner 9800'-9812', 9944'-10022', 10044'-10 true vertical Open Perfs 8970'-8978', 9017'-9037'NOV 0 & 2002 Sqzd Perfs behind Scab Liner 8776'-8786', 8902'-8970', 8990'-9017' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13-CR, TBG @ 9003' MD. 5-1/2" x 4-1/2" XO @ 4-1/2", 12.6#, 13-CR, TBG @ 9058' MD. Anchorage Packers & SSSV (type & measured depth) 9-5/8" x 5-1/2" BKR S-3 PKR @ 8999'. 9-5/8" x 5-1/2" BKR ZXP PKR w/Tieback SLV @ 9052'. 5-1/2" HES X Nipple @ 2182' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Shut-In Subsequent to operation 10/21/2002 1595 7284 183 216 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Operations __ Oil __X Gas __ Suspended _ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Title: Technical Assistant Date October 22, 2002 DeWayne R. Schnorr ~ ~ ....... -_ ~ _ Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 10/O6/2002 10/07/2002 10/08/2O02 10/09/2002 10/10/2002 10/1 O/2OO2 10/11/2002 10/12/2002 10/12/2002 10/12/20O2 10/O6/O2 10/07/02 H-20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS RWO CAPITAL: FILL CLEAN OUT RWO CAPITAL: FILL CLEAN OUT RWO CAPITAL: DRIFT/TAG RWO CAPITAL: RST / CNL / PNL RWO CAPITAL: AC-FLUID LEVEL RWO CAPITAL: PERFORATING RWO CAPITAL: HYDRATE/ICE PLUG RWO CAPITAL: AC-FLUID LEVEL RWO CAPITAL: DRIFT/TAG RWO CAPITAL: PERFORATING EVENT SUMMARY MIRU CTU #9, STANDBY DUE TO HIGH WINDS. PERFORM WEEKLY BOP TEST. RIH W/3.125" VENTURI. SOFT TAG @ 9702'. RAN VENTURI/PUSHED OBSTRUCTION TO 9837'. SPONGY BOTTOM ALL THE WAY DOWN. QUIT MAKING HOLE. POH TO CHECK VENTURI. VENTURI FULL OF GREEN CEMENT. RIH WITH 2.875" MOTOR & 3.7" THREE BLADE DRAG BIT. RUN IN HOLE WITH THREE BLADE DRAG BIT MILL & MOTOR. CLEAN OUT TO 11116' CTMD WITH FLO PRO SWEEPS. NEVER SAW ANY MOTOR WORK. DROP 3/4" BALL, OPEN CIRC SUB AND CIRCULATE OUT AT 80% RETURNS. FREEZE PROTECT TUBING TO 2500' WITH MEOH. <<< JOB COMPLETE >>> 10/08/02 10/09/02 10/10/02 DRIFTED TUBING AND TAGGED BOTTOM @ 10118' AMS WITH A 10' X 3.5"OD DUMMY GUN AND SAMPLE BAILER - HARD TAG - NO SAMPLE RECOVERED. <<< WELL LEFT SHUT-IN >>> RUN 4 PASSES RST IN SIGMA MODE (ONE 30 FPM & THREE 60 FPM PASSES). TD TAGGED @ 10120'. FIELD GOC PICK @ 9980'. NO PUMPING REQUIRED (HOLE FULLY CASED). NOTIFY PAD OPER OF STATUS. >>> 1200 hrs: T/I/O = 220/1000/0 TBG and IA FL (For E-line/Norene) TBG FL @ surface. IA FL @ 2070'. >>> 1710 hrs: T/I/O = 1040/1080/0 TBG FL (For E'Line/Norene) TBG FL @ 3570' 10/10/02 10/11/02 ATTEMPT TO PERFORATE UNDERBALANCED. UNABLE TO PASS 3604' (GLM #4). MOST LIKELY HYDRATES. APPEARS METH SPEAR PUMPED BY PAD OPER WAS NOT SUFFICIENT. RDFN. WILL RETURN W/DOWNHOLE PUMP AND MORE NEAT METH. PUMPED 20 BBLS METHANOL FOLLOWED BY 50 BBLS DIESEL HEATED TO 180' FOLLOWED BY 20 BBLS METHANOL DOWN IA TO THAW HYDRATES. $ NED DEC 0 6 2002. Page I 10/12/O2 10/12/02 10/12/O2 H-20 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS >>> 0830 hrs: T/I/O = 160/760/0 TBG FL @ 1200' (FL for E-line/Norene) >>> 1325 hrs: T/I/O = 970/1000/0 TBG FL 3609' RAN 2-7/8 DUMMY GUN W/SAMPLE BAILER TO 10121' WLM. (NO RETURNS IN SAMPLE BAILER.) <<< WELL LEFT SHUT-IN >>> REPERFORATE (POST RWO) 10075-10098' & 10022-10031' IN TWO RUNS W/2 7/8" PJ, 6 SPF, 60 DEG PHASE GUNS. WELL UNDERBALANCED 100 PSI FOR 1ST SHOT. ALL SHOTS FIRED. NOTIFY PAD OPER OF STATUS - OK TO POP. Fluids Pumped BBLS 8 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 5 TESTS) 130 METHANOL 55 METHANOL WATER 50 DIESEL 64 EXTRA SLICK SEA WATER 445 EXTRA SLICK KCL WATER 40 FLO PRO 792 TOTAL RE-PERFS I 0/12/2OO2 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2-7/8" HMX PJ2906, 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 10022' - 10031' 10075' - 10098' SCANNED DEC 0 6 2002 Page 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other i2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 80.20' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number 480' SNL, 1736' WEL, SEC. 21, T11N, R13E, UM H-20 At top of productive interval 9. Permit Number / Approval No. 183-007 2831' NSL, 735' WEL, SEC. 16, T11N, R13E, UM 10. APl Number At effective depth 50-029-20896-00 3032' NSL, 604' WEL, SEC. 16, T11N, R13E, UM 11. Field and Pool At total depth Prudhoe Bay Field / Prudhoe Bay 3114' NSL, 555' WEL, SEC. 16, T11N, R13E, UM Pool 12. Present well condition summary Total depth: measured 10330 feet Plugs (measured) true vertical 9242 feet Effective depth: measured 10126 feet Junk (measured) true vertical 9062 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110' Surface 2692' 13-3/8" 3720 cu ft Permafrost II 2692' 2692' Intermediate 9457' 9-5/8" 1322 cu ft Class 'G', 130 cu ft PF 'C' 9457' 8476' Production Liner 1104' 7" 302 cu ft Class 'G' 9224' - 10328' 8277' - 9241' Scab Liner 1166' 4-1/2" 174 cuft Class 'G' 9044' - 10210' 8122' - 9136' Perforation depth: measured Cemented Behind 4-1/2" Scab Liner: 9800' - 9812', 9944' - 10032', 10044' - 10098' true vertical Cemented Behind 4-1/2" Scab Liner: 8776' - 8786', 8902' - 8979', 8990' - 9037' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13Cr80 to 9004'; 4-1/2", 12.6#, 13Cr80 to 9060' Packers and SSSV (type and measured depth) 5-1/2" Baker 'S-3' packer at 8999'; 5-1/2"HES'XRN~J:)~a~2i8~i~F r) 13. Stimulation or cement squeeze summary See Attached summary. Intervals treated (measured) OCT 0 1 200~ Treatment description including volumes used and final pressure Anchorage 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Oil [] Gas [] Suspended Service [] Daily Report of Well Operations 17. I hereby certify that the foreg.,oing is true and correct to the best of my knowledge Signed Terde Hubble ,'~~' ~ Title Technical Assistant Date {~)(~' .'% ........... ~ :~ t PreparedByNarne/Nurnber: TerdeHubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate Well: H-20, Rig Workover Rig Accept: 08/11/02 Field: Prudhoe Bay Unit Rig Spud: N/A APl: 50-029-20896-00 Rig Release: 08/19/02 Permit: 183-007 Drilling Rig: Nabors 2ES PRE-RIG WORK 08/02/02 PPPOT-T PASSED, PPPOT-IC FAILED, PRESSURE WOULD NOT BLEED DOWN FROM TEST VOID AREA. PACKING VOID HAD PRESSURE. RECOMMEND CASING HANGER PACKOFF BE CHANGED DURING RWO. 08/03/02 BALLED 3 GAL OF PLASTIC COATING. ABANDONED ATTEMPT AT IBP. SET SLIP STOP, DUMMY OFF LIVE GLV'S STAff 6,5. SET DGLV'S AFTER LOAD IA. A'I-I-EMPT TO MIT IA, FAILED TROUBLE SHOOT. 08/04/02 PUMP 30 BBLS CRUDE DOWN IA TO TRY TO MIT IA TO 3000 PSI / TUBING TRACKING IA PRESSURE / TBNG & IA PRESSURES DROPPING OFF AFTER SHUTTING DOWN PUMP. TAG STA# 6,5 W.LIBS TO INSURE DGLS SET. A'I-I'EMPT MIT ON IA (FAILED). ATTEMPT TO PULL 5 1/2" SLIP STOP @ 5314' SLM, UNABLE TO DUE TO PLASTIC COATING. NOTIFY DSO OF WELL STATUS. RIH WITH 4" G SPEAR, UNABLE TO LATCH UP TO CATCHER SUB. RIG UP 5" G SPEAR UNABLE TO PUMP THROUGH SPEAR FOR PRESSURE TEST, BREAK OFF WELL HEAD AND REMOVED PLUG FROM SPEAR. FLANGE BACK UP TO WELLHEAD, UNABLE TO GET PAST LIP WHERE THE RISER MAKES UP TO WELLHEAD, LOWER EDGE OF THE G SPEAR SKIRT CATCHING LIP. UNABLE TO GET PAST BY PUMPING DOWN COIL OR BACKSIDE, BREAK OFF AGAIN AND GRIND A BEVEL ON THE SKIRT. RUN TOOLS BELOW THE LIP AND FLANGE BACK UP TO WELLHEAD. 08/05/02 RIH WITH 5.5" G SPEAR, PULL 5.5" W/L CATCH SUB AT 5321' CTMD. RIH WITH 1 3/4" HYD JDC & 3.5" BELL GUIDE. FOUND IBP 10,219' CTMD, (PBTD). ATTEMPT TO LATCH IBP, POOH. DID NOT RECOVER IBP. MU 3" CEMENT COMBO NOZZLE. PUMP 25 BBLS - 12.0 PPG CEMENT. WELL INITIALLY ON SLIGHT VAC. LAY IN CEMENT 1 FOR 1. SQUEEZE TO 1000 PSIG, HOLD 15 MIN. ESTIMATE 5 BBLS CEMENT BEHIND PIPE. ESTIMATE TOC @ 9700'. CONTAMINATE WITH BIOZAN TO 9700' TO ENSURE CEMENT TOP IS NOT HIGHER. POOH AT 80%. WELL TO REMAIN SI. 08/06/02 CHEMICAL CUTTER. SHOOT STRINGSHOT OVER INTERVAL 5654' - 5644'. CUT 5.5", 17 LB, L-80 TUBING AT 5650' USING 4 7/16" CHEM CUTTER, CENTRALIZED, W/6-SLIP AB, 15" GAS GRAIN, ELINE JARS. TBG / IA BOTH ZERO BEFORE AND AFTER FIRING. NOTIFY PAD OPERATOR OF WELL STATUS: LEFT SHUT IN. 08/07/02 FOUND WELL SHUT IN ON ARRIVAL. RAN 3.625" CENTRALIZER, EOT LOCATOR & SAMPLE BAILER. TAG EOT @ 9253' SLM. ELM-9266'. CORRECTION-13'. TAG TOP OF CEMENT @ 9921'-CORRECTED DEPTH. PT CMT. 2000# FOR 30 MIN GOOD TEST RDMO. 08/08/02 CHEMICAL CU'I-rER. SHOOT STRINGSHOT OVER INTERVAL 9021' - 9031'. CUT 5.5", 17 LB, L-80 TUBING AT 9026' USING 4 7/16" CHEM CUTTER, CENTRALIZED, W/6-SLIP AB, 15" GAS GRAIN, ELINE JARS. IA BLED DOWN TO 500 PSI. DEVIATION AT CUT POINT: 30 DEG. NOTICED HOLE IN CYLINDER AFTER FIRING, CHEMICAL APPARENTLY PASSED THRU SEVERING HEAD. NOTIFY PAD OP OF WELL STATUS: LEFT SHUT IN. MITOA TO 1000 PSI. PASSED. LOST 60 PSI 30 MIN. i :: : i p.emti nssumma iReport Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/9/2002 End: Contractor Name: NABORS Rig Release: 8/19/2002 Rig Name: NABORS 2ES Rig Number: ~ro~ ~:~ i~rsi C~de NpT: i Phase Description of Operations 8/9/2002 00:00 - 01:00 1.00 MOB P PRE Continue to adjust height for blocks warning bell. 01:00 - 01:30 0.50 MOB P PRE Hold PJSM. 01:30 - 06:00 4.50 MOB P PRE Move rig off of well. Move rig to H-20 location. 8/10/2002 00:00 - 00:00 24.00 MOB P PRE Move rig to H-20 location. Move Pits and camp to H-20 location. 8/11/2002 00:00 - 00:30 0.50 MOB P DECOMP Pin derrick, move camp and pits from DS-11 to H-20. 00:30 - 06:30 6.00 MOB P DECOMP Rig up. Continue moving camp and pits. 06:30 - 08:30 2.00 RIGU P DECOMP Spot rig over H-20. Spot pits. 08:30 - 10:30 2.00! RIGU P DECOMP Berm and spot cuttings tank, berm around cellar, hook up mud flow-lines spot camp and shop. 10:30 - 11:00 0.50 RIGU P DECOMP ACCEPT RIG: 10:30 hrs, Aug 11,2002. Hold pre-spud meeting. 11:00 - 12:00 1.00 RIGU P DECOMP Install secondary annular valve, take on seawater to the pits. 12:00 - 13:00 1.00 RIGU P DECOMP RU lubricator and pull BPV. 13:00 - 14:30 1.50 RIGU P DECOMP Continue to take on seawater and mix Barascrub pit while rigging up surface lines to tree. 14:30 - 16:30 2.00 RIGU P DECOMP Circulate well with 120 deg clean seawater at 6-1/2 BPM and 1040 psi. Sweep hole with 45 bbl Barascrub soap sweep. J16:30 - 17:00 0.50 RIGU !P DECOMP Install TVVC and test from below to 1,000 psi for 10 min. 17:00 - 19:00 2.00 RIGU P DECOMP ND tree and adaptor flange. Cap control lines. Verify hanger threads are 7" 19J4S, 6-1/2 turns. 19:00-21:00 2.00 RIGU P DECOMP NU BOPE. 21:00 - 23:00 2.00 RIGU P DECOMP Change out the top set of VBR rubbers from 3-1/2" x 6" to 4-1/2" x 7". Test choke manifold to 250 / 3,500 psi for 5/5 minutes. Witness of BOPE testing waived by Jeff Jones of the AOGCC. 23:00 - 00:00 1.00 RIGU P DECOMP RU 7" test joint and safety valve, Test the top set of RAMs to 250 / 3,500 psi for 5/5 minutes. 8/12/2002 00:00 - 02:30 2.50 RIGU ~ DECOMP Continue to test BOPE 250 / 3,500 psi for 5/5 minutes. Lay down 7" test joint and pick up 5-1/2" test joint. Test upper set of RAMs and Annular preventor to 250 / 3,500 psi for 5/5 min. Test upper and lower IBOP on Top Drive to 250 / 3,500 psi. 02:30 - 03:30 1.00 PULL ~ DECOMP Pull TWC with lubricator. 03:30 - 04:00 0.50 PULL = DECOMP PU landing joint and XO. Screw into hanger. PJSM. 04:00 - 05:00 1.00 PULL ~ DECOMP RU casing equipment and control line spooling equipment. 05:00 - 05:30 0.50 PULL ~ DECOMP Pull tubing hanger to rig floor with 25K lb of overpull. 05:30 - 06:00 0.50 PULL ~ DECOMP LD and inspect tubing hanger. 06:00 - 09:30 3.50 PULL ~ DECOMP Pull 77 jts (2,971') of 7", 26 Ib/ft, L-80, IJ4S tbg, plus dual control lines. Rubber flaking / falling off encapsulated control lines while POOH. Recovered 35 clamps and 2 stainless steel bands. 09:30- 10:00 0.50 PULL P DECOMP Lay down SSSV. 10:00 - 12:00 2.00 PULL P DECOMP Circulate hole clean and pump HI-VIS. Recovered 5 x 5 gal buckets of control line encapsulation material. 12:00 - 17:30 5.50 PULL P DECOMP Pull 146 jts of 5-1/2", 17 lb/fi, L-80, BTC tubing plus 23.56' cutoff. 17:30 - 19:00 1.50 PULL P DECOMP Clear and clean rig floor, service, TD. 19:00 - 21:00 2.00 PULL P DECOMP Make up Overshot BHA and drill collars, for pulling 5-1/2" tubing stub. RIH. UWT=50K, DWT=50K. 21:00 - 22:00 1.00 PULL :P DECOMP Make up 9-5/8" R-I-TS packer. RIH and set 2' below wellhead. Printed: 8/26/2002 10:31:59AM ::: O rati ns summa Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/3'1/1983 Event Name: WORKOVER Start: 8/9/2002 End' Contractor Name: NABORS Ri9 Release: 8/19/2002 Ri9 Name: NABORS 2ES Ri9 Number: :I Task: Code ~NPT: Phase Descd pti on of Ope rati o n s 8/12/2002 21:00 - 22:00 1.00 PULL = DECOMP Test to 1,000 psi for 10 minutes. 22:00 - 23:00 1.00 PULL = DECOMP :MU packoff pulling tool. Engage packoff, back out LDS, pull free with UWT = 60K. Install new packoff, run in LDS, test to 5,000 psi for 15 min. 23:00 - 23:30 0.50 PULL ~ DECOMP PU 4" test joint assembly. Test lower 2-7/8" x 5" VBRs to 250 / 3,500 psi for 5/5 min. 23:30 - 00:00 0.50 PULL = ~DECOMP Install WB. 8/13/2002 00:00 - 01:00 1.00 PULL P ! DECOMP RIH with packer retrieving tool. Release Storm packer, POOH and lay down. 01:00 - 07:30 6.50 PULL P DECOMP RIH with Over Shot BHA for retrieving 5-1/2" tubing stub and anchor. Continue RIH to 8,703', picking up 4" drillpipe (270 }oints). Break circulation every 1,000' to ensure BHA is clear. 07:30 - 08:30 1.00 PULL P DECOMP POOH to 7,396' standing back stands of drillpipe. 08:30 - 10:00 1.50 PULL P DECOMP Continue RIH to 9,014', picking up 4" drillpipe. (Pickup total drillpipe that will be needed to TD well). 10:00 - 11:00 1.00 PULL P DECOMP Circulate HI-VIS sweep around. 11:00 - 12:00 1.00 PULL P DECOMP Wash down over fish to 9,031'. K-Anchor would not rotate. Pull to 330K, and shear off SBR. 12:00 - 16:00 4.00 PULL P DECOMP POOH to BHA. 16:00 - 17:00 1.00 PULL P DECOMP Stand back DOs and handle BHA. 17:00 - 18:00 1.00 PULL P DECOMP Lay down BHA. Recovered 16.81' cutoff 5-1/2" tbg, sliding sleeve, 1 joint of 5-1/2" tubing, SBR (OD=6-1/2", ID= 4-7/8"). Total length of fish = 110.03'. 18:00 - 18:30 0.50 PULL P DECOMP Clear and clean rig floor. 18:30 - 20:30 2.00 PULL i P DECOMP RIH with OS BHA with a double bowl OS plus Accelorator Jars. Dress OS with 4-7/8" grapples. 20:30- 23:30 3.00 PULL :P DECOMP RIH to 9,000'. 23:30 - 00:00 0.50 PULL P DECOMP Wash down with pump pressure at 1,425 psi. Tag up on fish at 9,128'. Swallow 9' of fish. Circulating pressure increased to 1,800 psi. Pull to 300K to set grapples, slackoff. Rotate 12 times with 20K of overpull. String jumped free. PU with 190K, down weight = 150K. Tag up 3' higher. Circulate at 13.5 BPM and 1,420 psi. 8/14/2002 00:00 - 01:00 1.00 PULL P DECOMP Continue to circulate at 13.5 BPM and 1,420 psi. Blow down TD. :01:00 - 04:30 3.50 PULL P DECOMP POOH to BHA. 04:30 - 05:30 1.00 PULL P DECOMP Handle BHA. No fish recovered. !05:30 - 06:30 1.00 PULL P DECOMP Inspect fishing tools, clean and clear rig floor ;06:30- 08:30 2.00 PULL P DECOMP RIH to 8,720'. i08:30 - 10:00 1.50 PULL P DECOMP Slip and cut 102' of drill line. Servce Top Drive and Crown Blocks. 10:00 - 10:30 0.50 PULL P DECOMP RIH to 9,128'. UWT= 195K, DWT= 152K, ROT= 170K, 230 SPM at 1,460 psi. 10:30 - 11:30 1.00 PULL P DECOMP Latch onto and swallow fish from 9,128'-9,136'. Rotate 22 turns with 20K fi-lb of torque. Pull free with 300K maximum overpull. 111:30 - 15:00 3.50 PULL P DECOMP POOH to BHA. 15:00- 16:00 1.00 PULL P DECOMP Handle BHA. 16:00 - 17:00 1.00 PULL P DECOMP Release over shot from K-Anchor and lay slick stub + anchor (19.5'). (Latch slips from K-Anchor were not recovered). 17:00 - 17:30 0.50 PULL P DECOMP Clear and clean rig floor. 17:30 - 18:00 0.50 PULL P DECOMP Service Top Drive and change out handling sensor. 18:00 - 19:00 1.00 PULL P DECOMP PU/MU Packer Picker Mill BHA. 19:00 - 22:00 3.00 PULL P DECOMP RIH to 9,093' Printed: 812612002 10:31:59 AM operafi°nssummary Report ~Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/9/2002 End' Contractor Name: NABORS Rig Release: 8/19/2002 Rig Name: NABORS 2ES Rig Number: H0~rS I: yask] l:C°de i N~T::: Phase Description of Operations 8/14/2002 22:00 - 22:30 0.50 PULL p DECOMP iWT= 200K, DWT= 150K, ROT=150K without pumps. UWT=190K, DWT= 155K, ROT= 170K, with 8.5 BPM and 940 ~)si. Torque(off) =5/6K fi-lb. Tag top of fish at 9,145'. Insert Packer Retrieving tool 7', to 9,152'. PU and pull 25K over to verify tool set. 22:30 - 00:00 1.50 PULL P DECOMP Mill packer from 9,152' to 9,153'. Torque = 10/11 K, RPM= 55, 8.9 BPM, WeB= 12K. 8/15/2002 00:00 - 06:00 6.00 PULL P DECOMP Mill 4' of packer. Increase WeB to 32K, TQ = 9/16, RPM - 70-100, 0-260 GPM at 0-470 psi. Spud on packer and PU 50K over, repeatedly. 06:00 - 06:30 0.50 PULL I p DECOMP Packer broke free. Push to 9,205'. (7" - TeL @ 9,224'). Sweep hole. PU with maximum overpull to 285K. 06:30 - 08:30 2.00 PULL P DECOMP Work packer from 9,205' to 8,250', pulling 60-75K over while pulling each stand. 08:30 - 13:00 4.50 PULL P DECOMP Continue to POOH slowly. 13:00 - 14:00 1.00 PULL P DECOMP Handle BHA. No Fish. 14:00 - 14:30 0.50 PULL P DECOMP LD packer retrieving tool. Empty junk baskets. Recovered a 5 gallon bucket full of metal debris and cuttings. 14:30 - 15:00 0.50 PULL P DECOMP Clear and clean rig floor. 15:00 - 16:00 1.00 PULL P DECOMP MU BHA spear, dressed with a 4.805" grapple. 16:00 - 19:30 3.50 PULL P DECOMP RIH and tag up on fish at 8,805', with 20K. Continue to RIH to 9,204' before tagging fish again. UWT= 190K, DWT= 145K, weight hanging without fish = 149K. 19:30 - 20:30 1.00 PULL I P DECOMP Engage packer with 20K down. PU to 280K and jar free. Work packer fish to 8,421' jarring packer repeatedly. Continue to POOH with 10-15K overpulls from 8,421' to 4,352'. Pull 50K over at 4,352' and 35K over at 2,610'. 8/16/2002 100:00 - 01:00 1.00 PULL P DECOMP POOH to BHA. 01:00 - 02:00 1.00 PULL P DECOMP Handle BHA. 02:00 - 02:30 0.50 PULL P DECOMP LD 9-5/8" packer and millout extension, 3 jts of 4-1/2" tbg + "X", "XN" nipples. 02:30 - 03:00 0.50 PULL P DECOMP Clear and clean rig floor. 03:00 - 04:00 1.00 CLEAN P DECOMP Make up 8-1/2" bit and casing scraper. 04:00 - 06:00 2.00 CLEAN P DECOMP RIH to 9,183' with no excess down drag. 06:00 - 06:30 0.50 CLEAN P DECOMP Wash down to 9,212' and tag top of 7" liner. Set down 20K on liner. 06:30 - 08:00 1.50 CLEAN P DECOMP Sweep hole with HI-VIS pill at 13 BPM and 1,375 psi. UWT=190K, DWT= 155K, ROT-- 170K, torque = 6K fi-lb. 08:00 - 11:00 3.00 CLEAN P DECOMP POOH to BHA. 11:00 - 12:30 1.50 CLEAN P DECOMP LD 6-1/2" DC and BHA. Clean 1/2 gallon of cuttings from junk baskets. 12:30 - 13:00 0.50 CLEAN P DECOMP Clean rig floor. 13:00 - 15:00 2.00 CLEAN P DECOMP PU 4-3~4" DCs, HWDP and Cement Cleanout BHA. 15:00 - 17:00 2.00 CLEAN P DECOMP RIH to 9,174'. 17:00 - 18:30 1.50 CLEAN P DECOMP Cut and slip drill line. Service top drive. 18:30 - 19:00 0.50 CLEAN P DECOMP RIH to 9,926' and tag up on TOC. Sweep hole. 19:00 - 00:00 5.00 CLEAN P DECOMP Drill cement from 9,926' - 10,107'. UWT= 215K, DWT- 150K, ROT- 170K. ART=4.5 hr. 8/17/2002 00:00 - 02:00 2.00 CLEAN P DECOMP Drill to 10,211', IBP. (ReP = 0, Torque increased by 2,000 fi-lb). 02:00 - 03:30 1.50 CLEAN P DECOMP Circulate the hole with HI-VIS sweep at 13 BPM and 2,800 psi, while rotating and working the pipe. Slug pipe and drop rabbit. 03:30 - 05:00 1.50 CLEAN P DECOMP POOH to liner-top at 9,212', with 30K overpull at liner-top. Printed: 8126/2002 10:31:59AM I OPerati°n isumma* Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8~9~2002 End: Contractor Name: NABORS Rig Release: 8/19/2002 Rig Name: NABORS 2ES Rig Number: ~ate F~o~T01 :~OUrs Task COde:NPT i lphase Description of Operations 8/17/2002 03:30- 05:00 1.50 CLEAN P DECOMP Work pipe. 05:00 - 06:00 1.00 CLEAN P DECOMP Pump sweep and circulate bottoms up at 13 BPM and 2,370 psi. 06:00-06:30 0.50 CLEAN P DECOMP RIH to TD at10,211'. 06:30 - 08:00 1.50 CLEAN P DECOMP Pump sweep and circulate bottoms up at 13 BPM and 2,760 psi. Slug pipe. 08:00 - 11:30 3.50 CLEAN P DECOMP POOH to BHA. 11:30 - 13:30 2.00 CLEAN P DECOMP Change out elevators. LD HWDP and DCs. Clean out 2 gal of metalic debris from junk baskets. 13:30- 14:00 0.50 CLEAN P DECOMP :Clear rig floor. 14:00 - 15:00 1.00 CASE P COMP RU casing equipment. Hold PJSM. 15:00 - 16:00 1.00 CASE P COMP Run 28 its of 4-1/2", 12.6 Ib/ft, L-80, I BT-M, R3 liner casing. .Thread lock the shoe joints and float equipment. Make up to the base of the curl on the threads, using Best-O-Life thread compound. Install 27 free floating turbulators on the liner. 16:00 - 16:30 0.50 CASE P COMP Make up HMC liner hanger and ZXP liner-top packer. 16:30 - 20:30 4.00 CASE P COMP Run in hole with liner on drillpipe, filling every 10 stands. 20:30 - 21:00 0.50 CEMT P COMP MU cement head, and break circulation. UWT= 210K, DWT= 140K. 21:00 - 22:00 1.00 CEMT P COMP Circulate at 6 BPM and 510 psi. Batch mix Latex cement, hold PJSM. UVVT= 218K, DWT=137K. 22:00 - 23:30 1.50 CEMT P COMP Pump 5 bbls of H20, test lines to 4,500 psi. Pump 5 bls of spacer (H20). Pump 31 bbl (174 sx) of 15.6 ppg, Class "G", Latex cement with 0% FW and WL=30. Pump at 5.5 to 6 BPM. Shut down pumps, drop wiper dart. Displace cement with 40 bbl of perf pill, followed by 65.5 bbl of 70 degree F seawater. Displace perf pill at 4 BPM, seawater at 5.6 BPM. Slow pump rate to 3 BPM, latch up at 88.5 bbl displacement, bump plug at 105.5 bbls of displacement as calculated. Set liner 1' off TD and discontinued reciprocating at 90 bbl of displacement. CIP at 23:08 hours, 8/17. Continue to increase pressure to 3,500 psi, check floats and set hanger. Rotate 21 turns and release from the hanger. Imediately pressure drillstring to 1,000 psi. PU and release packoff seals. 23:30 - 00:00 0.50 CEMT P COMP Circulate excess cement to surface at 12.8 GPM and 2,020 psi, sweeping hole with excess perf pill. 8/18/2002 00:00 - 00:30 0.50 CASE P COMP Continue circulating bottoms up. Had 2-3 bbl of cement returns at the surface. PJSM. 00:30 - 01:00 0.50 CASE P COMP Slack off 70K lb and set liner top packer. Repeat set down with 70K, repeat set down with 70K, while rotating. 01:00 - 01:30 0.50 CASE P COMP PU, LD cement head. 01:00 - 05:30 4.50 CASE P COMP POOH laying down 4" DP to 4,500'. 05:30 - 06:00 0.50 CASE P COMP Service Top Drive 06:00 - 06:30 0.50 CASE P COMP RIH to 5,433' with excess stands of drillpipe stood back in derrick. 06:30 - 11:30 5.00 CASE P COMP POOH laying down 4" drillpipe. 11:30 - 12:00 0.50 RUNCOr F' COMP Pull Wear Bushing. 12:00 - 13:00 1.00 RUNCOr P COMP RU casing equipment for chrome tubing. 13:00 - 14:00 1.00 RUNCO~ F' COMP Pressure test 4-1/2" liner x 9-5~8" casing to 3,000 psi. 14:00 - 00:00 10.00 RUNCO~ P COMP Run completion assembly, 179 of 225 joints of 5-112", 17 Ib/ft, 13CR80, VAM-ACE, R3 tubing. Thread lock all connections below the packer. Average make-up torque = 4,700 fi-lb using Multi-Make White thread compound. Printed: 812612002 10:31:59AM :::: i i iO:p :rati nssUmma Report Legal Well Name: H-20 Common Well Name: H-20 Spud Date: 1/31/1983 Event Name: WORKOVER Start: 8/9/2002 End: Contractor Name: NABORS Rig Release: 8/19/2002 Rig Name: NABORS 2ES Rig Number: :i'~ie : '~om~Toil H6Urs iTa~k COde NPTii ~Phase: Description of Operations 8/19/2002 00:00 - 03:30 3.50 RUNCOr I~ COMP Run completion assembly, joint #180 to 225 of 5-1/2", 17 Ib/ft, 13CR80, VAM-ACE, R3 tubing. !03:00 - 04:30 1.50 RUNCOr P COMP Sting into liner tie-back receptacle, no-go at the hanger crossover and PU 6'. Space out tubing and hanger. 04:30 - 05:30 1.00 RUNCO~ Ixl SFAL COMP Make up tubing hanger and landing joint. The pin connection on the pupjoint beneath the hanger would not torque up correctly. (pin and box connection below were both galled). LD hanger. 05:30 - 09:30 4.00 RUNCO~ I~ COMP Reverse circulate 50 bbl of clean seawater, 50 bbl of HI-VIS spacer, 300 bbl of clean seawater, 240 bbl of corrosion inhibited seawater followed by 158 bbl of clean seawater at 3 BPM, 150 psi and 140 deg F. (Note: The hanger was sent to Baker's machine shop, and a new pup joint was bucked up onto it, while circulating). 09:30 - 10:30 1.00 RUNCOI~ COMP Make up tubing hanger using the compensator. 10:30 - 12:00 1.50 RUNCOIV¢ COMP Make up landing joint, land hanger, run in LDS, laydown , landing joint. 12:00 - 14:00 2.00 RUNCOI~ COMP Drop ball and rod. Pressure tubing to 3,500 psi and set S-3 packer. Hold pressure on tbg for a 30 minute test. Bleed down tubing pressure to 1,500 psi, pressure up the 5-1/2" tubing x 9-5/8" csg annulus, plus packer to 3,000 psi and test for 30 mnutes. Bleed off tubng pressure and shear RP valve. 14:00 - 14:30 0.50 RUNCOI~ COMP Install TWC and test from below to 1,000 psi. 14:30- 15:30 1.00 RUNCOI~ COMP ND DOPE. 15:30 - 17:00 1.50 RUNCOI~ COMP NU new adaptor flange and refurbished tree. Test to 5,000 psi. 17:00 - 18:00 1.00 RUNCOI~'~ COMP RU lubricator and pull TWC. 18:00 - 21:00 3.00 RUNCOI~ COMP RU Hot Oil services and pump 150 bbl of diesel freeze protect. U-tube same. 21:00 - 22:00 1.00 RUNCOI~ COMP Install BPV and test to 1,000 psi. 22:00 - 23:00 1.00 RUNCOI~' COMP Remove secondary annulus valve from tree and install a blanking flange. Secure tree and cellar. Clean cuttings from under the rotary. RIG RELEASED at 23:00 HRS, August 19, 2002 Printed: 8/26/2002 10:31:59AM STATE OF ALASKA ALA~'-'"~OIL AND GAS CONSERVATION COMMISSIC~-''' REPORT OF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate 34 Other x 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 480' SNL, 1736' WEL, SEC. 21, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Stratigmphic Sewice Datum elevation (DF or KB) KBE = 80.20 AMSL feet Unit or Property name Prudhoe Bay Unit Well number H-20 (42-16-11-13) PBU At top of productive interval 9. Permit number/approval number 2448'SNL, 742'WEL, SEC. 16, TllN, R13E, UPM ORIGINAL 83-7/ At effective depth 10. APl number 2198' SNL, 582' WEL, SEC. 16, T11N, R13E, UPM 50- 029-20896 At total depth 11. Field/Pool 2166'SNL, 563' WEL, SEC. 16, T11N, R13E, UPM Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 10330 feet BKB 9242 feet Plugs (measured) Effective depth: measured 10250 feet Junk (measured) truevertical BKB 9171 feet fill at 10250' MD (01/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 8 c.y. 145 Surface 2657 13 3/8 3720 c.f. 2692 Intermediate 9422 9 5/8 1452 c.f. 9457 Production -- Liner 1104 7 302 c.f. 9224-10328 Perforation depth: measured 10044'- 10098' True vertical depth BKB 145 2692 8475 8276-9240 Sqzd: 9944'- 10032' true vertical subsea 8910'-8956' Tubing (size, grade, and measured depth) 7' L-80 surface-2971'; 5 1/2"L-80 2971'-9156' with 4 1/2' tailpipe to 9281' Packers and SSSV (type and measured depth) 9 5/8' Baker SAB packer at 9156'; 5 1/2" SSSV at 2985' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used' and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 4321//14088 80 0 / 4912/'22454 126 0 Tubing Pressure 1089 300 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned~/~i~,~,)r ~:~~ Title SeniorTechnicalAssistantl Form 10-404' Rev 06/15/88 Date ,~/~/~ ~/ I SUBMIT IN Db(PL4'CATE 4/06/93 5/7/93 fjh 4/11/94 WELL H-20(42-16-11-13) Addnerf/NRWO The following additional interval were perforated using 3 3/8" guns, 4 SPF, 45° orientation and 90° phasing. 9800'-9812'MD A NRWO was performed using the following fluids: SUMMARY Squeezed interval 9800-9812 using 11 bbl class G cement. Lower open interval 10,044-10,098 was isolated with a sand plug. Got good pressure test after reversing and jetting. Combination of a short open interval and 7 x 5 1/2" completion made for a lengthy well kill. FLUIDS PUMPED 693 bbls SW (kill & cool Liner) 257 bbls SW (Cool Sump) 5 bbls Effluent Water (Pre-flush) 11 bbls Class "G" Cement 54 bbls SW (Displacemen0 323 bbls SW (Reversing and Jetting) 0 bbls Dual Polymer Gel 36 bbls Methanol CEMENT: BJ :15.8 PPG Class G Cement containing,0.10% CD-32,0.25% R- 11 0.45% FL-33,1 gal/100 sx FP-6L BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 06/28/93 T% 84697 BPX/PBU ~MAGNETIC TAPES W/LISTINGS Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at (907) F-46 CH/PDK-100 8980o00- 9362.00 API%500292212200 A-23 CH/PDK-100 11012.00-11504.00 API#500292071600 g 3-07.-~.o ct I E-20 CH/PDK-100 9559.00-10222.00 API#500292089600 H-25 CH/PDK-100 9940.00-10726.00 API#500292147800 FIN 05/08/93 1600BPI 9394->TP~ FIN 04/06/93 1600BPI 9395->TP# FIN 04/23/93 1600BPI 9397->TP9 FIN 1600BPI 9398->TP# 06/02/93 If you have any 564-4004. #1 ATLAS REF95672.01 ATLAS REF95783.01 ATLAS REF#4069.01 91 ATLAS REF#5666.01 Information Control Well Records RECEIVED JUL 0 6 1993 Alaska Oil & Gas Con~, ~,~m~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 05/04/93 T# 84544 BP/PBU CH LOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at ~A-32 ~'~'/~LEAK DET 0 347 q GAS LIFT SURVEY 0 ~ B-34 PROD-F 0 ~.~C-08"?3°~3PRODUCTION LOG 0 C-ll 7~.¥& PRODUCT~O~ ~OG 0 6 ~./&~PFC o ~E-027~.~ PRODUCTION LOG 0 E-29 ~7-]~ PROD-F 0 ,G-06 ?~.1~. LEAK DET 0 H-19C2-~13PRODUCTION LOG 0 H-20,R~.~ PDK-100 0 N-12 ~{--/~ PRODUCTION LOG 0 s-34 ~-~3L PFC 0 ! 4/29/93 #1 4/21/93 #1 4/28/93 #1 4/27/93 #1 4/27/93 #1 4/30/93 #1 4/30/93 #1 4/28/93 #1 4/28/92 #1 4/28/93 #1 4/23/93 #1 4/27/93 #1 4/23/93 #1 5/01/93 #1 4/29/93 #1 Information Control ~ell Records below. If you have any (907) 564-4004. 9350.00-10062.00.ATLAS 5 " 2200.00-10332.00 ATLAS 2+5" 11414.00-11768.00 ATLAS 5 " 11500.00-12054.00 ATLAS 5 " 11500.00-12054.00 ATLAS 5 " 9800.00-10232.00 ATLAS 5 " 9500.00- 9970.00 ATLAS 5 " 11500.00-11680.00 ATLAS 5 " 9600.00- 9994.00 ATLAS 5 " 11950.00-12214.00 ATLAS 5 " 9350.00- 9590.00 ATLAS 5 " 11100.00-11525.00 ATLAS 5 " 9600.00-10225.00 'ATLAS 5 " 9500.00- 9842.00 ATLAS 5 " 10230.00-10511.00 ATLAS 5 " BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 BP/PBU ~. OGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at ~A-04~~'0~ PFC 04/07/93 #1 -~ A-23 ~O PDK-100 04/06/93 ~1 ~'# A-24%~ PFC 04/04/93 #1 ~,~,B-07~,\~5 PFC 04/17/93 ~1 B-1 ~ PRODUCTION LOG 04/16/93 #1 B-34~'7' PFC 04/15/93 #1 ~0C-26 ,~ PFC 04/11/93 #1 ~ D-I~ ~' PFC 04/12/93- #1 ,~E-10 ~ PRODUCTION LOG 04/17/93 91 ~ E-11~ PRODUCTION LOG 04/14/93 91 F-I~~ CCL/PE~ 04/06/93 91 H-17 ~!~. PFC 04/13/93 ~1 H-2~~~ PFC 04/06/93 ~1 S_i~,~ LE~ DET 04/15/93 91 PRODUCTION LOG 04/04/93 91 ~.~-35~ PFC 04/08/93 ~1 ~ X-02 PRODUCTION LOG 04/16/93 ~1 Y-i~~ PRODUCTION LOG 04/10/93 ~1 Y-1~ PRODUCTION LOG 04/10/93 ~1 DATE: 04/21/93 T# 84491 below. If you have any (907) 564-4004. 10500.00-10893.00 ATLAS 11050.00-11495.00 ATLAS 10754.00-11037.00 ATLAS 11550.00-11800.00 ATLAS 9180.00- 9450.00 ATLAS 11600.00-11950.00 ATLAS 11371.00-11795.00 ATLAS 8700.00- 9200.00 ATLAS 11450.00-11694.00 ATLAS 10350.00-10705.00 ATLAS 9985.00-10240.00 ATLAS 10280.00-10670.00 ATLAS 9604.00- 9920.00 ATLAS 11000.00-11500.00 ATLAS 3000.00-11610.00 ATLAS 9600.00- 9900.00 ATLAS 9500.00- 9920.00 ATLAS 9930.00-10320.00 ATLAS 2200.00-10280.00 ATLAS 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " Information Contro~ Well Records ~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:05/24/91 EXXON T#: 82465 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM Tape & Transmittal Only Bp MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. CASED .HOLE TAPE: X~~~" ' C-12 ~ ~(~00 H-20 OPEN CNT-D SCH#74575 CNT-D SCH#74576 HOLE TAPE: P-10 DTE/BHC/CNL/LDT SCH#74539 P-10 RFT/FLD SCH#74539 05/17/91 #5 11091-11966.5 1600BPI AP1#50-029-20387 05/17/91 #1 9394-10255 1600BPI AP1#50-029-20896 05/02/91 1600BPI 0 4/28/91 1600BPI #1 &2 2639.5-9624.5 AP1#50-029-22158 #1 3339.88-5442.05 AP1#50-029-22158 TAPT POS.#07766 TAPE POS.#07767 TAPE POS.#07768 TAPE POS.#07769 Information Control Well Records LR 2-1 J. Dietz BP EXPLORATION TO: DISTRIBUTION · BP Exploration (Alaska) Inc. 900 East Benson Boulevard ~,~rl~orage, Alaska 99519-6612 (9O7) 561-5111 " 0~[ &?~u ua~e:u~/21/91 ~991 T~:82415 FROM: ~, ,,ummlul0ll Aic.--- ,-' ¢; -' Information Control . ~t~;[tO[E~B Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4,!.45. B-25 Packer Set 05/17/91 #1 0-10098 Sch 5" D-15 CNL 05/16/91 #5 9795-10587 Sch 5" D-20 CNI. JGR 05/16/91 #1 9600-10293 Atlas 5" C-12 CNL' 05/17/91 #5 11095-11955 Sch 5" H-06 CNL/GR 05/15/91 #1 9450-9753 Atlas 5" H-08 CNL , 05/14/91 #2 8850-9426 Sch 5" H-14 CNL/GR 05/16/91 _. #1 9950-10745 Atlas 5" H-30 CNL/GR 05/17/91 #1 10700-11548 Atlas 5" H-20 CNL 05/17/91 #1 9395-19238 Sch 5" J-17 CNL 05/18/91 #1 9995-10930 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO ARCO EXXON PHILLIP_8 ........ .~/.S'~'~3-OF.. ALASKA_... Date: 11/28/89 TS: 80640 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. H-05 CH/TDT-P 11/12/89 81 10979.5-11576 Tape Pos%06811 Sch#73549 1600bpi API450-029-20106 H-20 CH/CNL/MS 11/19/89 41 9380-10260 Atlas%4069 1600bpi API%50-029-20896 Tape Pos.~06813 H-30 CH/CNL/MS 11/18/89 41 10680-11590 Tape Pos.%6814 Atlas44062 1600bpi API450-029-21800 J-18 CH/CNL/MS 11/25/89 fl 11865-12785 Atlas44080 1600bpi API%50-029-20986 Tape Pos.#06815 ARCHVIES ONLY: H-05 CH/TDT-P field tape 11/12/89 Sch{73549 800bpi API#50-029-20106 Tape Pos.%06812 information Control W.e!i Kecords LR2-1 j Dietz/S BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/22/89 Transmittal: 80617 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. H-20 CNL/GR 11/19/89 ~1 9400-10239 Atlas 5" B-02 CCL 11/20/89 #1 9686-10521 Atlas 5" R-05 CCL 11/19/89 91 8913-9340 Atlas Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES RECEIVED ' o 1989 ,:. uas Co~s. Anchorage Standard Alaska '"~-~' Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION JaF~uary 31, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well H-20 (42-16-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB:JAM Enclosures (4) L. Burke (MB12-1) Well Records (LR2-1) w/10 H-20 Well File nager Production Engineering RECEIVED FEB 2 ,':' .Oil & Gas Cons. Commission ',~,~ ~nchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. , ' .... ' STATE OF ALASKA ~ ~'"' AL,-,SKA OIL AND GAS CONSERVATION COMM~, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown. Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 480' SNL, 1736' WEL, SEC. 21, T11N, R13E, UPM At top of productive interval 2448' SNL, 742' WEL, SEC. 16, T11N, R13E, UPM At effective depth 2198' SNL, 582' WEL, SEC. 16, T11N, R13E, UPM At total depth 2166' SNL, 563' WEL, SEC. 16, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 5. Type of Well: Development X Exploratory Stratigraphic Service . 10330feet Plugs (measured) BKB 9242feet 10250feet Junk (measured) BKB 9171feet 6. Datum elevation (DF or KB) KBE = 80.20 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number H-20 (42-16-I 1-13) PBU 9. Permit number/approval number 83-7 / 8-933 10. APl number 50- 029-20896 11. Field/Pool Prudhoe Oil Pool fill at 10250' MD (01/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 x 30 8 c.y. 145 Surface 2657 13 3/8 3720 c.f. 2692 Intermediate 9422 9 5/8 1452 c.f. 9457 Production -- Liner 1104 7 302 c.f. 9224-10328 Perforation depth: measured 10044'. 10098' True vertical depth BKB 145 2692 8475 8276-9240 Sqzd: 9944'. 10032' true vertical subsea 8910'-8956' Tubing (size, grade, and measured depth) 7" L-80 surface-2971'; 5 1/2" L-80 2971'-9156' with 4 1/2" tailpipe to 9281' Packers and SSSV (type and measured depth) 9 5/8" Baker SAB packer at 9156'; 5 1/2" SSS V at 2985' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure r3 rrCl~lrr~ 1\ L, '~.. L i ~ FEB 2" t:. J' :~c-' ' ~ , laska & Gas Cons. C0mmissi0.] ......... ~.~ ~ '~n~hnron~ 14. Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X Reoresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl 1630 948 6 4199 2620 10 16. Status of well classification as: Oil X Gas . Suspended Casing Pressure 212 219 Tubing Pressure 226 472 Service 17. I hereby certify that the for~.~g is true and correct to the best of my knowledge. Signed .~~ ,,/"~...~[,~L,.~ Title Manager Production Engineering Form 10~/t Rev 06/15/88 SUBMIT IN DUPLICATE WELL H-20 (42-16-11-13~ STIMULATION OPER/kTIONS A 1/$% HCI perforation wash and scale inhibition treatment was performed on the following perforated interval in Well H-20. 10049'- 10098'MDBKB An inflatable packer was set at 10049' MD to isolate the treated interval from the upper squeezed perforations. The HC1 wash was performed 12/14/88 as follows: 105 bbls. 15% HC1 w/1.1 ppp OSR diverter was pumped down coiled tubing. The packer was then unseated and 22 bbls. diesel with 10% mutual solvent was pumped while reciprocating across perfs. The well was returned to production immediately, then tested. The following coiled tubing scale inhibition treatment was performed 12/23/88: 10 bbls. diesel preflush w/mutual solvent 10 bbls. EDTA w/diverter 42 bbls. scale inhibitor solution w/diverter 270 bbls. treated seawater overflush 15 bbls. diesel w/mutual solvent 21 bbls. diesel overflush to ensure above fluids enter formation The well was left shut in for 24 hours, then returned to production and tested. jm 1/24/89 Oil & Gas Cons. Commission's. '~chorage ~tandard Alaska · ~ Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION December 6, 1988 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well H-20 (42-16-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM Enclosures (9) cc: L. Burke (N~B12-1) H-20 Well File /-A. _ nager Production Engineering RECEIVED DEC - 7 1988 A~ask~ Oil & C~3s Cons. Cornmissior~ Anci-~orage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIb,.,,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing__ Repair well __ Plugging ~ Time extension ~ Stimulate X Change approved program Pull tubing __ Vadance .__ Perforate Other 2. Name of Operator Standard Alaska Production Company 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 480' SNL, 1736' WEL, SEC. 21, T11N, R13E, UPM At top of productive interval 2448' SNL, 742' WEL, SEC. 16, T11N, R13E, UPM At effective depth 2198' SNL, 582' WEL, SEC. 16, T11N, R13E, UPM At total depth 2166' SNL, 563' WEL, SEC. 16, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10330 feet BKB 9242 feet 10250 feet BKB 9171 feet 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE--80.20 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number H-20 (42-16-11-13) PBU 9. Permit number 83-7 10. APl number 5O- 029-2O896 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) fill at 10250'MD (01/88) Casing Length Size Structural -- Conductor 110 20 x 30 Surface 2657 13 3/8 Intermediate 9422 9 5/8 Production -- Liner 1104 7 Perforation depth: measured 10044'- 10098' Cemented Measured depth 8 c.y. 145 3720 c.f. 2692 1452 c.f. 9457 302 c.f. 9224-10328 True vertical depth BKB 145 2692 8475 8276-9240 Sqzd: 9944'- 10032' true vertical subsea 8910'-8956' Tubing (size, grade, and measured depth) 7" L-80 surface-2971'; 5 1/2" L-80 2971'-9156' with 4 1/2" tailpipe to 9281' Packers and SSSV (type and measu red depth) 9 5/8" Baker SAB packer at 9156'; 5 1/2" SSS V at 2985' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation December 1988 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Service RECEIVED Gas Suspended DEC--- 7 1988 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I / / (/[_/ FOR COMMISSION USE ONLY I Cor~iti~s of approval: Notify CommisEion so representative may witness ~ [,,,/Plug integrity BOP Test m Location clearance__ _ ,. /, Mechanical Integn--~'ty Test Subsequent form required 10- '.~" ,. 'Cons. C~mm!s?!r'r~ Anci~orage I Approval No. ~'._ ?~ QR{GINAL SIGNED BY Approved by order of the Commission t p~i¢: C,_ ~MITH Form 10-403 Rev 06/15/88 . Sub~.cquent ~¥o:k Reportecl on C,o rp,rn~ i,.,s,§ iD n e r Ap? '-"1 ~'~ '" ~ "'' Returned Date//r_~ SUBMIT IN TRIPLICATE WELL H-20 STIMULATION PROPOSAL A 15% HC1 perforation wash followed by a contingent scale inhibition treatment is proposed for the following perforated interval in Well H-20. 10049' - 10098' MD BKB An inflatable packer will be set at 10049' MD to isolate the interval to be treated from the upper squeezed perforations. 4000 gal. 15% HC1 w/1.1 ppp OSR diverter will be pumped down coiled tubing. The packer will then be unseated and 1000 gal. diesel with 10% mutual solvent will be pumped while reciprocating across perfs. The well will be retumed to production immediately, then tested. Depending on the results of the HC1 wash, the following coiled tubing scale inhibition treatment will be performed: 10 bbls. diesel preflush w/mutual solvent 10 bbls. EDTA w/diverter 42 bbls. scale inhibitor solution w/diverter 270 bbls. treated seawater overflush 15 bbls. diesel w/mutual solvent Sufficient flush to ensure above fluids enter formation The well will be left shut in for 24 hours, then returned to production and tested. jm 11/30/88 R CElVE ') DEC - ? .1988 Aias~.,'a uii & ",-;r:~,s Certs. Cornmissior~ Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Of'i' Blind Rams Cutter Rams 2' Chicksan (Kill Line) Slips '~0 Pipe Rams Pump-In Sub (Clrcula te/R o turns) W ell Head INDEXED TO: DALI~S ARCO CHEVRON EX](ON TEXACO MOBIL PHILLIPS STANDARD ALASKA PRODUC TIC)N Date: 02/24/88 TI: 78597 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: 02/02/88 Camco Static Gradient 02/08/88 Camco " " 02/08/88 Camco " '" 02/12/88 Camco " " 02/12/88 Camco " " 02/03/88 Camco " " 01/27/88 Otis " " 02/02/88 Camco " " 02/04/88 O0 " 02/04/88 GO " 02/10/88 Camco " " 02/13/88 Camco " " 01/28/88 Otis " " 01/24/88 Otis " " 01/23/88 Otis " " 02/03/88 Camco " " 01/25/88 Otis " " 01/26/88 Otis " " 02/15/88 Camco " " 02/10/88 Camco " " Received Date Founded ,. Cle.elond. ~,o. ,n 1870 Victoria Aldridge INFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company-' 900 East Benson Boule' P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 STANDARD ALASKA PRODUCTION February 17, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well H-20 (42-16-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of performing a cement squeeze and reperforation of the well. Yours very truly, JAB: JAM ~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 H-20 Well File upervisor Production Operations A unit of the original Standard Oil Company Founded in Cleveland. Ohio, in 1870. ,,---'-, STATE OF ALASKA ---,_, ALAS OIL AND GAS CONSERVATION COIV SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~,, Plugging ..%.' Perforate ~ Pull tubing Alter Casing ~ Other ~ 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 480' SNL, 1736' WEL, Sec. 21, TllN, R13E, UPM At top of productive interval 2448' SNL, 742' WEL, Sec. 16, TllN, R13E, UPM At effective depth 2183' SNL, 573' WEL, Sec. 16, TllN, R13E, UPM At total depth 2166' SNL, 563' WEL¢ Sec. 16, TllN, R13E, UPM 11. Present well condition summary Total depth: measured 10330 feet Plugs (measured) true vertical 9242 feet BY~ 5. Datum elevation(DF or KB) KBE = 80,20 6. Unit or Property name Prudhoe Bay Unit Feet 7. Well number H-20 (42-16-11-13) PBU 8. Approval number 445 9. APl number 50--029-20896 10. Pool Prudhoe Oil Pool Effective depth: measured 10287 feet Junk (measured) true vertical 9204 feet BI4_B Casing Length Size Cemented Measured depth True Vertical depth Structural -- BKB Conductor 65' 20"x30" 8 cu.yds. 110' 110' Surface 264?' 13 3/8" 3720 c.f. 2692' 2692' Intermediate 9412' 9 5/8" 1452 c.f. 9457' 8475' Production -- Liner 1104' 7" 302 c.f. 9224'-10328' 8276'-9240' Perforation depth: measured 10044' - 10098' true vertical (subsea) 8910' - 8956' Tubing (size, grade and measured depth) 7" L-80 surface-2971'; 5 1/2" L-80 2971'-9156' with 4 1/2" tailpipe to 9281' Packers and SSSV (type and measured depth) 9 5/8" Baker SAB packer at 9156', 5 1/2" Otis SSSV at 2985' ~r~" F ,%VU~% 12. Stimulation or cement squeeze summary See attachment Intervals treated (measured) Treatment description including volumes used and final pressure 1987 /~,task~ 0ii & ~qas C..'}ris. lmch0rafle 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf WateroBbl Casing Pressure ~bing Pressure 1450 1059 6 0 1073 2760 1715 213 0 227 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~_ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-~¢'4 Rev. 12-1-85 Title Supervisor Production Operations Date ,2'/7' Submit in Duplicate Well H'20 (42-16-11-13) PBU CTU CEMENT SQUEEZE OPERATION~ A coiled tubing cement squeeze of existing perforations and a potential cement channel to the GOC was performed as detailed below. Following CTU operations, the lower squeezed interval was reperforated and the .upper squeezed interval was left squeezed. . Rigged up coiled tubing unit and pressure tested BOP's to 4000 psi. 2. Cleaned out wellbore to PBTD. . Performed cement squeeze on existing perforations and cement channel. . Contaminated cement in the wellbore, then reversed out after 48 hours. 5. Rigged up Gearhart and reperforated the following interval using 3 1/8" carrier guns at 4 spf: 10044' - 10098' MD BKB 6. Put well back on production and tested. The above work was completed October 25, 1986. jm 10/28/86 INDEXED DALLAS ARCO CHEVRON E)CXON TEXACO Date: 01/06/87 TO: MOBIL TI: 77644 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PI~ODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It fo this office: A.-16 - Injection Profile/Flowmeter/Temp A-23 Temp. 10/24/86 A-23 Borehole Audio Tracer 10/24/86 A-23 Borehole Audio Tracer 11/06/86 A-23 DF]7 11/06/86 B-9 Borehol~ Audio Tracer 11/16/86 D-17 CCL/Perf. 11/23/86 D-18 CCL/Perf. 11/23/86 f/1 D-26 Spinner 12/07/86 D-27 CCL/Perf. 11/19/86 D~28 CCL/Perf.. 11/20/86 (/1-3 -E-7 EPL 07/23/86 E-9 CCL/Perf. 11/16/86 (/1 E-9 Cont. Flow Survey 11/29/86 E-9 Temp. 11/29/86 G-31 CCL/Perf. 11/10/86 f/1 ~-15 Collar 12/07/86 f/l H-20 CCL/Perf. 10/25/86 f/l-2 M-17 Temp. 11/29/86 M-22 CCL 10/30/86 P-14 GR/Correlation 11/07/86 T-i' Injection Profile 11/22-23/86 U-3 Inj ecion Profile 11/29-30/86 11/26-27/86 t~l 9900-11182 Camco 2700-10100 GO 2"/5"/1" ~/1 1000-10600 GO 2" ~/1 500-10600 GO 1" 3950-10600 GO 5" f/1 1900-3200 GO 5" 8850-10346 GO 5" 10700-11260 GO 5" 10500-10870 Camco 5" 8650-9690 GO 5" 9500-11110 GO 5" 8350-9457 Sch 5" 10600-10980 GO 5" 10500-10905 GO 5" 10500-10905 GO 5" 6980-9228 GO 5" 0-2500 CAMCO 5" 9050-10200 GO 5" 11000-11758 GO 5" 9500-10550 GO 5" 10790-11000 GO 5" 10400-10923 CAMCO 5" 9000-9530 CAMCO 5" Victoria Aidridge INFORMATION CONTROL Well Records LR2-1 511 INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 11/21/86 MOBIL T#: 77539 PHILLIPS sTATE OF -'ALAS~ GEOSCIENCES STANDARD AL ASK~ PRODUCTION REFERENCE: ~ SAPC CASED HOLE FINAL LOGS . The following material ls being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: ( (:~ . - F-5 G-27 G-27 H-20 J-1 N-7 Y-!i Y-24 Collar Log 09/19/86 #1 9436-9659 Sch 5" GR 09/16/86 #1 6965-10775 Sch 5" Gun Positioning 09/17/86 #2 8250-9025 Sch 5" Production Profile 11/10/86 #1 9800-10160 Camco 5" Squeeze Gun Record 09/19/86 #1 8800-9100 Sch 5'7 Production Profile 11/10/86 #1 10100-10570 Camco 5" Flowmeter il/12/86 #2 9600-10314 Camco 5" Flowmet er 11/15/86 #1 13150-13430 Camco 5" Received Date A ~n,I OI lhe O*,O,nol 51oncJ¢l,(| C),l Victoria Aldridge INFORHATION CONTROL Well Records LR2-1 Standard Alaska ~ ~. Production Company 900 East Benson Bouleva~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) $64-51 I I INDEXED DALLAS ARCO CHEVRON STANDARD ALASKA PRODUCTION EXXON Date: 11/03/86 TEXACO 77484 TO: Tt: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES (Transmittal Only) REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by slgnlng a copy of this letter and returning It to this office: ~ B-2 ~ C-29 ~ F-4 ~ H-20 ~ J-6 ~ M-5 ~ R-26A ~ R-27 ~--S-18 ~ Y-23 Static Gradient 09/15/86 Camco " " 09/03/86 " " " 10/16/86 " " " 10/04/86 " " " 10/04/86 Otis " " 10/03/86 Camco " " 10/02/86 Otis " " 10/20/86 Camco " " 10/13/86 Camco " " 10/13/86 Camco " " 10/15/86 Camco Received drtdge ~Alaska 0it & ~:hCo~C°mmissi°nwel NFORHAT I O.11 RecordsCONTROLLR2- I A u,,,t of the of,9,n(~! ;o,,nd,ed ,,, (.le-elo,,d. Oh,o. ,n 1810 INDEXED DALI. S ARCO CHEVRON EXXON TEXACO Date: 10/15/86 TO: MOBIL TI: 77413 PHILLIPS ~' ! STATE 'OF -ALASKA GEOSCIENCES STANDARD AL ASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: - ~C-38 ~M-5 ~N-3 R-26A ~ R-27 Y-3 eCL/Perf. 09/29/86 #1 9800-11132 GO 5" Temp/Flow Meter 10/01/86 #2 9300-9700 Camco 5" Injection Profile 9/25/86 #1 11150-11450 Camco 5" Temp. 10/0.2/86 #2 2000-10605 Camco 5" Temp/Pump-in 10/04/~ {.-. #1 9800-10200 Camco 5" Temp/Permafrost 10/03/86 #1 Surf-2200 Camco 5" Temp. 09/19/86 #- 11100-11728 Otis 5" CCL/Perf. 10/08/86 #1 7700-9619 GO 5" CCL/Perf. 10/06/86 #1-2 8500-9750 GO 5" Injection Profile 09/24/86 #1 11300-11680 Camco 5" Injection Profile 9/26-28/86 #1 9050-9500 Camco 5" Received Date A ur~,l Of Ih,~, Of,g,nol Slu,~elo,¢l CM Co,t~pontr fou,~ded ,n Cle~elond. C~,o ,,, 1870 / AlasV~ 0il & Gas Cons, Commission An~ho,~e ~ yNiFc t Oo~u~N Aclo~d~Ri4 g e We I I Records LR2-1 . Standard Alaskag_~''' Production Cart 900 East Bensor, .~vard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-51 ! 1 October 2, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well H-20 (42-16-11-13) PBU Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. Yours very truly, JAB:JAM~ Enclosures (9) cc: J. L. Haas (MB12-1) H-20 Well File . A. Bragg ~ upervisor Production Operations A unit of the or,ginoi Standard Oil Company Founded in Cle, e!ond Ohio in 1870 · STATE OF ALASKA '--'-- ALA,_ .,~ OIL AND GAS CONSERVATION CON .... SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon -- Suspend '- Operation Shutdown - Re-enter suspended well - Alter casing -' Time extension /_ Change approved program '~ Plugging -- Stimulate - Pull tubing - Amend order - Perforate OtherX 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of well at surface 480' SNL, 1736' WEL, Sec. 21, TllN, R13E, UPM At top of productive interval (top Ivishak/Sadlerochit) 2448' SNL, 742' WEL, Sec. 16, TllN, R13E, UPM Datum elevation (DF or KB) KBE = 80.20 Unit or Property name Prudhoe Bay Unit Well number H-20 (42-16-11-13) PBU 8. Permit number 83-7 9. APl number 50--029-2O896 At effective depth 2183' SNL, 573' WEL, Sec. 16, TllN, At total depth 2166' SNLr 563' WELr Sec. 16, TllN, 11. Present well condition summary Total depth: measured 10330 true vertical 9242 R13E, UPM R13E, UPM fe~t feet BK~ Effective depth: measured 10287 feet true vertical .9204 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Structural ,- Conductor. 65' 20"x30" 8 cu.yds. Surface 2647" 13 3/8" 3720 c.f. Intermediate 9412' 9 5/8" 1452 c.f. Production -- Liner 1104' 7" 302 c.f. Perforation depth: measured 10. Pool Prudhoe~..0i~ feet 110' 2692' 9457' 9224'-10328' 'i" 0 6 1986 Alaska Oil & Gas Cons. COFr~!.s~,-,~, Anchorage Measured depth True Vertical depth 110' 2692' 8475 ' 9944' - 10098' (two intervals) true vertical (subsea) 8821' - 8956' Tubing (size, grade and measured depth) 7" L-80 surface-2971'; 5 1/2" L-80 2971'-9156' w/4 1/2" tailpipe to 9281' Packers and SSSV (type and measured depth) 9 5/8" Baker SAB packer at 9156'; 5 1/2" Otis SSSV at 2985' 8276'-9240' 12.Attachments Description summary of proposal ~j Detailed operations program ~- BOP sketch . 13. Estimated date for commencing operation October 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and corredt to the best of my knowledge Si~ed-~,/"~,,¢0 ,/~ ~ Title Supervisor Production Operations Date/0' 2' ~ (/2' A. Bragg Commission Use Only '~ Plug integrity_ ~.~.-.BOP Test © Location clearance Approved by ~' ~ ~ ~' ?~i ~ ~ ,~',;, ~, ...... ~'~{ Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate Coiled Tubing Blow-Out-Preventers )lied Tubing Pack-Off Blind Rams i I Cutter Rams ~ ~~~-2' Chick.an (Kill Line) I ~ Pump-In Sub Pipe Rams (C irc ulate/R · turns) ~-- --'~ W ell Head ~ Swab Valve WELL H-20 CTU CEMENT SQUEEZE PROPOSAL The following coiled tubing cement squeeze of~existing perforations and a potential cement channel is proposed. Following CTU operations, the lower squeezed perforations will be reperforated and the upper perforated intervals ( 9944'- 10032' MD BKB ) will be left squeezed. 1. Rig up coiledl, tubing unit and pressure BOP's to 4000 psi. 2. Clean out wellbore to PBTD or to top of solid fill. 3. Perform cement squeeze on existing perforations and cement channel. 4. Contaminate cement in the wellbore.,~W~C. 5. Reverse out contaminated cement after 48 hours. 6. Test squeeze. 7. Reperforate the following interval at 4 spf: 10044' - 10098' MD BKB 8. Put well back on production and test. INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CttEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS ~ STATE :'i-~ BPAE (Transm±ttal Only) 3111 "C°° STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T#: 3/5/85 76035 REFERENCE: SOHI~INAL DATA - PRESSURE SURVEY DATA llowing material is being submitted herewith. Please acknowledge receipt by signing a f this letter and returning it to this office:-- H-8%/ PBU & BHPD 1/31-2/2/85 Go H-17V Flowing Gradient & BHPD 1/30-2/1/85 Camco H-18~ PBU & BHPD 2/3/85 & 2/4/85 Go ~¢}g~/ PBU & BHPD 2/5/85 & 2/6/85 Go !~:~ Flowing Gradient & BHPD 2/2-2/3/85 Camco K-i'~/ Static Gradient 2/6/85 Camco K-3~-~ Static Gradient 2/8/85 Camco K-6~'~ Static Gradient 2/10/85 Camco K-2A,~/ Static Gradient 2/12/85 Camco M-5J Static Gradient 1/4/85 Otis M-17o~. Gradient & BHPD 1/17 & 1/19/85 Camco M-17// Flowing Gradient 1/17-1/18/85 Camco N-18%/ PBU & BHPD 2/7 & 2/8/85 Go Q-3-'~' static survey 12/2/84 Go R-9~ Static Gradient 2/18/85 Otis R-10-- PBU & BHPD 2/14 & 2/17/85 Go S-8~/ PBU & BHPD 2/9 & 2/11/85 Go RECEIVED DATE ~i J i~:;~-~---D eve 1 opm e n t Geology Well Records '.'ii SOHIO ALASKA PETROLEUM COMPANY S t:O :\I~.CO CI1EVtiON EXXON To SFO/UNIT/STATE' 'FEZACO ( -Ha rat boa) HOBIL PtlILLI~ BPAE ;11 I I "C- ANCttORAC,[. ALASKA fl~l_[.t'}lONl~ 19071 265.0000 MA~L: POUCt4 6.612 ANCt4()RAOE. ALASKA 99502 Date: 2/27/85 T~ 76018 REF£R£NC£: SOHIO CASED HOLE FI. NAL LOGS . Ilowimg material is being submitted herewilh. Please acknowledge receipt by sigmimg a copy of lhis letter and returning it to this office:-- SFO/UNIT/STATE: /H-17 Spinner 1/30/85 #1 10300-10550 Camco 5" //H-20 Spinner 2/2/85 ~1 9800--10150 Camco 5" C-2 ~1 9800-10150 GO 5" CFS 1/8/85 /D-6 CFS 1/3/85 #1 9050-9400 GO 5" G-3 CFS 1/13/85 ~1 .8850-9250 GO 5" / G-5 CFS 1/29/85 #1 10750-11110 GO 5" / H-8 CFS 1/31/85 #1 9000-9421 GO 5" X-ll CFS 1/17/85 #1 9180-9560 GO 5" /.X-ll Temp Survey - 1/17,18/85 #1 9180-9560 GO 5" HI I.I 'VI I~ :;.; I , ,/' lit'vt 14)l"C[I l Well Records INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON TEXACO TO: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS STATE }/ BPAE (Transmittal Only) 31 1 I '°C" STREET ANCHORAGE, ALASKA TELEPHONE 1907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 02/05/85 Tf/: 75990 REFERENCE: S~ FINAL DATA - PRESSURE SURVEY DATA he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-14/' -PBU & BHPD Sheet 11/12,13/84 GO B-2/ PBU & BHPD Sheet 11/11/84 GO H-7 / Flowing Gradient & BHPD 11/27-29/84 Camco H-18/ Static Survey 01/07/85 GO H-19'--- Static 01/03/85 Otis ~'-~2,~? Static 01/02/85 GO 3-i~g~'" PBU & BHPD 11/24,25/84 GO J-17~'" PBU & BHPD 11/17,18/84 GO M-7u-~ PBU & BHPD 11/06,07/84 GO N-7/ Static 12/07/84 Otis N-10''~'~ Static 01/07/85 Camco R-9J ~ PBU & BHPD 12/12,13/84 GO R-16'''~ PBU & BHPD 11/08,09/84 GO R-iS--- Static 11/26/84 GO X-7'~ Flowing Gradient & BHPD 01/03-05/85 Camco X-9/- Static Gradient 12/04/84 GO X-14-" Flowing Gradient & BHPD 12/31/84-1/02/85 Camco RECEIVED DATE SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 January 23, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well H-20 (42-16-11-13) PBU Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. JAB/~/pjw Enclosures cc: A. E. Leske Geolog]f Well File ~17 Yours very truly, James A. Bragg District Petroleum Engineer (Acting) , . 9g. 5 Ancfior~ge STATE OF ALASKA .~-~.. ~' ALASKA...,L AND GAS CONSERVATION C MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG __ 1. Status of Well Classification of Service Well OILY~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7.~r_n~t Number Sohio Alaska Petroleum Company - 3. Address 8' A% ~rn_~e6 89 6 P.O. Box 6612, Anchorage, Alaska 99502 50- 4. Location of well at surface 9. Unit or Lease Name 480' SNL, 1736' WET., Sec. 21, TllN, R13E, UPM (Corrected) Prudhoe Bay Unit At Top Producing Interval Top of Sag. R. Sst. 10. Well Number 2503' SNL, 782' WEL, Sec. 16, TllN, R13E, UPM H-20 (42-16-11-13) PBU At Total Depth 11. Field and Pool 2166' S~L, 563' ~'~KL, Sec. 16, TllN, R13E, U~ ./,.~ Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designat~o'~and Serial No.. '~' ~ ¢( ~,~ Prudhoe Oil Pool KBE : 80.20' ~4SL ADL 28274 ' 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. 15. Water Depth, if offshore 116' No' of Completions 1--31--83 2--10--83 2--14--83 feet MSLI One 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set [0330'~D 9242'TVD 10287'MD 9204'TVD YES [] NO [] 2985 feet MD 2030 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, DIL/FDC/CNL/GR/CAL, CBL/VDL/CCL/GR, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ~-0" x 30"::nsulate~;onductor Surface 110' 36" 8 cu,yds, concrete i3 3/8" 72# L-80 Surface 2692' 17 ½ 3720 cu. ft. Permafrol~t II 9 5/8" 47# L-80 Surface 9457' 12¼ 1322 cu.ft. Class G; 130 cu. ft. Permafros~ C 7" 26# L-80 9224' 10328' 8½ 302 cu.ft. Class G w /18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD 'TVDss SIZE DEPTH SET (MD) PACKER SET (MD) Prudhoe Oil Pool Top: 9944' 8821' 7"/5½ 9138' 9138' Bottom: 10098' 8956' w/4%" T~ lp~pe 9282' 9944'-10032' BKB (8821'-8898' TVDss) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10044'-10098' BKB (8909'-8956' TVDss) DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) December 24, 1984I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD [[~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. COP E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gasorwater. Submit core chips. ~ ~/~-C~ / V~D· None i a , Form 10-407 Submit in duplicate Rev. 7-1~80 CONTINUED ON REVERSE SIDE 29. NAME Sag R. Sst. Shublik Ivishak GEOLOGIC MARKERS MEAS. DEPTH 9487 ' 9524' 9624' ~-TRUE VERT. DEPTH ,, Subsea 8421' 8453' 8540' 30. FORMATION TESTS Include interval tested, p, essure data, ;~.11 flu,(ts ,ecuve,'e(t an(I flrav~ty, GOR. and time of each phase. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~~~ D ist ri ct Pe tro le um Engineer Sign . . Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion rel)ort and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ~'¢ - STATE OF ALASKA ALAS~,.~-,~.~. AND GAS CONSERVATION ivllSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum ~y 83-7 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20896 4. Location of well at surface 9. Unit or Lease Name 480' SNL.-, 1736' WEL, Sec. 21, TllN', R13E, UP.M .(corrected) Prudhoe Bay. grutt At Top Producing Interval Top of Sag. R. Sst. T~LO~.~c~.. 10. Well Number 2503 S~, 782 WEL, Sec. 16, Ti]N, R13E, UPM, ~F~.,r:~- I PI~20 ~42~16:~11-.13)~ PBU At Total Depth ! ,. F ! 11 ' Field and P'ool ~ bur{'. ~__~------~ 2166' SNL, 563' WEL, Sec. 16, TllN, R13E, UPM I~ H i prud~K)e. Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Desig~tL~n and _S, erial No.~ .......... Prudhoe Oil Pool 80. 0' I 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or ~r~¢~l",~l 5. Water Depth, if offshore 116. No. of Completions 1-31-83 2-10-83 2-14-~83 ~ feet MS L 0n~ 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ I-VD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost /0330'MD-9242'TVD 10287'MD-9204'TVD YES [] NO []I 2985 feetMD 20,30' 22. Type Electric or Other Logs Run DIL/BHCS/SP/~}DI'L/FDC/CNL/GR/'CAL, CBL/VDL./CC~/'GR, 'Gryo.. scopic Survey, 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 20 x 30 I'nsulat~] Cz~nd~c~ ,r .q~.~.=_ ] 1 ~' 36 8 -~.~-S- cQnc~e. 13 3/8 72~ L-80 Surfac=~ 2692 17½ 3720 cu~t. 'Perma. fr~)s~ 9 5/8 47~ L-80 Surface 9457 12~ 1322 cu, ft. Class G 130 cu. ft; P~r()st c 7 26# L-80 9224 10328 8½ 302 cu,ft, Class G w/18o salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7"/5½" 9138" 9138: W/4½" Wai.lpipe 9282" None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. : DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED : 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I '~low Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CON E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. --None Aiask~ Oil & Gas uuns. Anchorage Form 10-407 Submit in duplicate Rev. 7~1-80 CONTINUED ON REVERSE SIDE 29. GEOLOGIC IVIAR K ERS NAME jjMEAS. DEPTH 30. FORMATION TESI5 Include interval foaled, p:essur[.~ data, ail flu;~'it~ Sag. R. Sst. j! 9487' Shublik i! 9 524' Ivishak Jj 9624' !1 TRUE VERT. DEPTH Subsea 8421' 8453' 8540' GOR, an(; time of each phase 31. LIST OF ATTACHMENTS Well History, Nell Loqs and Directional Survey .32. I hereby certify that the foregoing is t~ue and correct '.o the best of my knovv',edge ~ tX ~ \ ~ ,[~ , .Jki~istri.ct Drilling Engineer INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion ret~ort ar~(t Iof. l on ali types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injectio~, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16' and 24: If this well is completed for separate production from more than one interval (~nulliple completion), so state in item 16, and in item 24 show the producing intervals for only the interval ret)orte¢t in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. tern 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). tern 23' Attached supplemental records for this well should show the details of any multiple stage cement ~ng and the location of the cementing tool. Item '27' Method of Operation' FIo,,.,i.ng., Gas Lift, Rod Pump, Hydraulic Pump, Subrnersilile, Wat(:r jection, Gas Iniection, Shubin, Other-exp'~'n. Item 28: If no cores taken, indicate "no,re" GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY 50HTO COMPANY Pad, H-20 WELL NAME -, pRUDHf)F gAY~ Al ASKA LOCATION AL183D2 SINGLE SHOT 2~11~-83 JOB NUMBER LYNN HENSLEY NAME ENGINEER ,~ / , / [, , ///<.~/-~?~~ TITLE SIGNATURE 2700 10330 DEPTH INTERNAL FROM TO 1-31-83 2-10-83 DATES SURVEY TAKEN ~ FROM~ TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, all copies of the survey report will be forwarded to you on written request. All surveys are kept in a locked file and are held in strictest confi- dence. Additional copies of your survey report can be made from the original by any blueprint company. GREATLAND DIRECTIONAL DRILLING COMPLETIOI',I REPORT OMPU]'ED ON 2-1£)-83 USING RADIIjS OF RURVATURE 't"ECI4NiQUE ROM 'SURVEY DATA TAKEN 2-10-83 I NAL r::LOSURE D I RECT I ON N 1'7.82 E iNGLE SHOT SURVEY RECORD OF SURVEY ( WELL A'.F..';'.::;UMED VERT I F:AL TO 27(:],0. (")) :::; 0 t..-.i I 0 H- ':::: EAS DR I FT TRUVERT .=,L B.=,EA F.:;EF:T I ON EF'TH DG MN DEF'TH DEPTH DIF;]' D ZREC"f' iON RELATIVE CF'u]RD ~ I'~ATES AI',IGLE FROM WEL. L-FtEA]EI CLCI:L:;URE DI'_~G L. biG D I '.=J'T' A N C E I.'l G h N S d e e / i 0 0 ,.. (-) 0 0 0.00 -80.20 0.00 0.00 0.00 0. (}(:) 0. (] 0 (") (:~ 0 0. (:,() 0 270 ¢:' 0 0 2'700.00 261 'FI · 80 z/=,y 4 :2:(.') 2768.'73 2688 73 2845 7 30 2844.50 2764· 30 2 9 4 6 8 :3 (') 2 'F/4 4. F,~..,.."~' ..,_,'--' '='/-..,~,'~. ":'._,..'-, 302'? 10:30 :--:026.38 2946. 18 308'F¢ 12 3 (:~ 3085. 17 :3004. 'F/'7 3151 14 0 :3145.52 3065.32 ~-:234 15 30 3225.78 3145.58 3327 18 0 3:314.8:2: 32:34.63 338'.-T¢ 19 0 3373.62 327~:i-:. 42 2:481 21 3(i) 3459. 'P3 3:379.7:2: 3542 23 0 3516.39 3436. 19 ~ 6 :':: 4 25 0 :--:/- 00.4 :--: '-' = '" ¢ .... .~._~ .-' .). ':.' 3 367.¢6 26:30 3656.27 :3576.07 3789 30 0 :37:2:8. 18 :3657.98 -i I-i ~- (- · · ..:,,= ..... ~ :2: i 45 :':: 7 'F,' ('i, 5:':: :3710 3:':: "::'~ 1 i :-'::3 45 :3841 · 8:':: :37/_-, 1.6:3 3S./7'.:.' :'::5 :'::0 38'.-7:7 · 79 :'-:817.5'.-"..' q- 1 :--:0 :36 :::0 4(1) 1 '.:'.'. '.:::'5 :3'.-.".,'3'F.". 75 ~.682 :2:5 45 44/,5,81 4385, 61 ~-,?.:34 3/.:, 0 45:--::.9, ':.-/8 4-5(i:,:--:. 78 q.'F..'TS :2:5 15 4706, 03 4.625 · 83 0.84 N 54.0(') W 4.81 N 30.00 W i 6.06 N 7.00 W 28.79 N 0.50 W 40.39 N 8.50 E 54.49 N 12.50 E 75.52 N 12.00 E 102. 1:3 N 12.00 E i21.79 N 14.50 E 15:2:.52 N t2.00 E 176.47 N 10.50 E 213.62 N 11.50 E 240.39 N 11.50 E 2:34.20 N 13.00 E :2,'15.37 N 12.50 E 348.24 N 1:3.00 E 3::--:6.70 N 11.50 E 474.:--:7 N 11.00 E 798.46 N 12.50 E :387.25 N 14.00 E 'F~7i.00 N 15.50 E 1.5? N 2.19 W 7.45 N 7.47 W 20·69 N 11.90 W 34.35 N 12.79 W 46.27 N 11.'F/6 W 6~-~.24 N 9.:3'? W 80.89 N 4.89 W 107. 11 N 0.67) E 126.26 N 5.19 E 157.25 N 12.49 E 179.'~0 N 17.00 E 216.6:3 N 24. 14 E 243.02 N 29.51 E 286.0:3 N 38.84 E :316.56 N 4.5.75 E :348.74 N 5:3.04 E 386.50 N 61.2:3 E 473.55 N 78.55 E 792.15 N 144.82 E 878.85 N 165.2:3 E '95'?.76 N 186.59 E 209.43 E 232.43 E ~--,. M:=: E 280.60 E -_-]128 35 30 4:328.33 4748.13 1057· 76 N 15.00 E 104:3.74 N ~5282 :35 0 4'FI 54. 10 4873.90 1146.53 N 15.00 E 1129.59 N _] .-,=.. .-:,~ ...... - _ . .4.: ......... 0 5079 42: 4'--*':;'9 Z::: 12:34.21 N 16.00 E 1214 16 N ~;587 35 0 5205.58 5125.38 1322.51 N 16.50 E 12'~8. '36 N · .-.':' 71 N 54 0 (i W 1() "='= N 4`=. :2: "~'"'" W ~ ,_1 .,~l ,_1 2:2:· 87 N 2?) ~'i'-:',_ ._, ._~:;":' W~. :36.66 N 2(") 25 2'f~ W 47.7'.:) N Z4 29 27 14 6(1). '~ 7 Iq 8 .5(1) 28 W 8i.04 N 3 27 2.5 W t07.11 N ¢) 2i 60 E 126.:36 N '2 '?1 21 E 157.74 N 4 o"" .-.'-' :2:1 E i 8(1). 7 ("~ N 5 2:':: 50 E 217.97 N 6 21 28 E 244.'-R,i,_ N 6 .,.,==__ 22 E 2(::::;:.66 N 7 44 '.2 E :2:1 ,.:/. ,-,,:,._,r-.. N 8 1:3 27 E '~.~;'~' 75 f'4 P :3:--:49 E ,_1 ._ a- · :3 $/1. :32 N '.:/ 0 '? E 4P,()_ . .02 N 9. .-.._,""'"' ~ E 805. ~,_, '~'':' N 10 2 :L :--:7 E 894. :2.~; N 1(:) 38 52 E '777.9:3 N 10 59 .~;8 E 1064 54 N 11 .-'.) 45 E 115:3.26 N 11 37:38 E 1240.83 N 11 54 ..,':' E 1:328.92 N 12 11 23 E t. i 2.4':,";~ 3.4(:)7 2. 449 i. :--:08 2. ~:,::-: 8 i. 6/_-,':" 2 7q-. 2.4:5::5: 2. 18:':: · ?. A i ? '2' / ,2., ._ · _~. -'~"~ I~I --., ?,-7 ;~,, ":' 28:_:: .,::. (:,7'.:/ 0.67 :'J: (-}. 1/-_,5 O. 379 0.62/:, 0.20 i 0.215 0. 107 ~I0 H-20 RECORD OF SURVEY :_'AS DR I FT TRUVERT SUBSEA SECT I ON :'PI"I4 DG MN EEF FH DEF'TH [ I.:, F DIRECTION RELATIVE COORDINATES ANGLE FROM WELL-HEAD 5714 :2:4 45 '"'"",F'"" . ._ 0 E 1 :'::: 6'7 :":': 1 iq · _,.:, .,,:,. 1:2: 5227 'ii:' :2: 1 ;2:9:2:. 97 N 1 '7. =;' . =;869 35 0 5435.29 5355.09' 1482·57 N 15.50 E 1452.28 N 2,095 :36 0 5619.28 5539.08 161:3.72 N 16.00 E 1578.59 N 2,248 36 30 5742.66 5662.46 1704.12 N 15.00 E 1/:,65.'77 N ~-,39)1 :36 :::0 5857.61 5777·41 1789.09 N 15.50 E i747.:-2:3 N 2,514 36 30 57¢56.4:} 5876.29 1862.22 N 16.50 E 1818.16 N B668 35 45 6080.88 6000.68 1952.97 N 16.00 E 1905. :32 N .-,.,: 9..: ...'-,"',.:, ._,'='.~._ 0 /-_,'='.. ,:,'-',:,'"" ..... 80 6208 60 2100 Pl 4 N 1 6, 50 E 2047 . ,[], ?;. _ N 7' 141 33:3,[) 64/:,8. ';:'9 /:.:,388.7'.::,' 2223. 18 N 16. o0 E 21/:.:,4. :-2:4 N '-'R'- /. .~'- /. =- '-' .... "=' 7.:,._ F,' 32 0 :,6._ :z. :'::;2: :,._, 7..-. :1. :2: 2341 07 N 16 .'=;0 E 2278. U,._, N 757/:, 30 30 6837, :34 /.-757./,:,4 2453./:,3 N 18.00 E 2385,56 N ?703 29' :30 6":-~47,'""-' 6867 63 ':'~ . . · :.d...:, , ..,..17 1:3 N 17 00 E 2446 12 N 7'850 2'.;¢ 30 7075.77 6'~':.-25.5'7 258';:', 51 N :1.8. O0 E 2515. :1.5 N 3077 28 45 7274.06 719:3 · :-2:/_.-, 26?:'.--.,'. 98 N 1 'F.¢. 50 E 261'.:'.¢. 77 N :,-' ';~. ~:, ~-._, 29. 0 74 '-'.:, '-',=,. 6,9 7 '-'._', '"'._, '"'',:, . 4 '9 '27 'F.~ 0 · 6 :-2: N 21 .00 E 2704 . '~ 4 N :, o.-~, 29 ':'/.~.' ..... ..'o.50 E ,-77._ :38 N .,4~_.- . 0 757/:,. 01 74 .~ ._ 81 2:::6/-, =,/-, N '-"-' '-' F,. 3578 29:30 7712. 12 7631.92 2942.30 N 25.00 E 2844.88 N 3734 30 15 7847,3L:.: 7767.18 3019.06 N 28.50 E 2914..26 N .,:' ,_,'= ~._ -.-(') 29. 15 794:3.09 7 :=: 67 . ,_,. ©'-} .......... "~ 07 .~ .42 i`4 :A 0 50 E 2964 '=._, = N F¢005 30 0 8082,83 8002.63 3150. 10 N 3:1_.00 E 3030.20 N ~'~, 97 :2:1 0 ':' '-~ - (' ':' '-~'-' (' .,. ......... 6 .). 27 ,_, ~,:, .). ('). 7 3 ;2: O'F/ .2'--" N :2:1 .00 E :2:170 .2 ::: N :2473 31 30 8485.0?,' 8404. ~E:,..} 3382.89 N 31.50 E 3235.04 N 3'[) i. 5o E 326.67 E 362.29 E 386.47 E 40:E:. :34 E 429.0i E 454.41 E 495.72 E · _,.:,U. ~'~ 5 E 563.05 E 596.43 E 615.53 E 637.30 E 672.81 E 704.23 E 733.05 E 764. '"'= 799.32 E 827.67 E 866.84 E 951.01 E ';'90.30 E ~:' 909 28 (') '-"-' '"'-' ....... :.¢.J N 1107 ._': 2: E -. ,:,,=,,/:.:,.5'7 87:-2::-2::2:7 :::F;'-}l :::8 N :34 o0 E :341/:, '-= .'-'- ..... :,0 28 0 ':.¢ 2 ":: F,. ,. _. 29. 91==. ._,._,. (]9.. :7::7:-2:3: .06 N :7::1 · O0 E "' = '-"-'.z, ._, ,:, .:, . 63 N 121:3..~;0_ E CLOSURE D i S T A N F:E D G i'fl ~',,.l S 1400. i5 N 12 26 6 E 148 :B. =i'~ · ./ 1`4 1'2 4o :':':'7 E 1/:..19·6:3 1,4 12 55:3:2: E 1710.01 N 1 :':: :2: 4:'::: E 1 '795. F) l N 1:2: '~.:" 56 E 18/:,8.09' N 13 16 :'35 E 1958.7/.:, N l:'::24 51 E 21()6.22 N 1:':::'.::6 47 E 2228.7:.2: N 1:3::45 2S.' E ';::346./_-,1 N 1:i: 52 60 E 2458·99 N 14 2 14 E · -.:, .r...] 'T., "') .,..,_ .,..... :37 N 14 7 28 E · "', '"" m"' · .' ._, :..'4.64 iq 14 1:3 7 E 2704.'7'9 N t4 24 12 E 2795.11 N 14 :"::5:35 E 2F':70,56 N 14 47 4:7:: E 2945.77 N 15 2 2':) E ;2:(],_ 21 . :::_ ':'.". N 1 ._, = 20 1/_'. E :3077.73 N 15 36 0 E 3151.75 N 15 57 51 E 2:3':)9.85 N 1/_',41 53 E :':::3:B3.2'2 N 17 i 1:2: E :3591.:37;' N i'7 57 21 E :2:7::2.,'3.51 N 1:3 42 2/:, E DOG LEG d e _~ / i 0 o O. :'::'::i' ::2: 0.454 ,:,. 0.400 0. t 24 0.288 0,499 0,30 t 0. 0,69 i 0.714 0.810 0. 165 O. :364 0. 230 0. 374 0. :39a 0.745 0.95 ~'- (.) 0.311 0.81:3 A;".c c3 "-":~ & :'}'_'-s C.,~s. +"' ...... iL'.Y:2~C f8.{i5 ~I0 H-20 DATA INTERPOLATED FOR EVEN FEE]' OF SUB:=;EA DEF'TH -:F"I'H 180 280 :380 480 580 680 '~ 780 880 980 1080 1180 1280 1380 1480 1580 1680 1780 1880 1980 2080 2180 2280 2:380 2480 2580 · ~ ~-, o) · - 6,-'.(. 2781 28,'=_:2 2'~8:2: · --. () ,~, ,,~ :--~ 1:37 3291 .-:, .-:, ,_~ ..,._,. 7 3503 3612 TRU VERT SUB ~EA MD-TVD DEPTH DEPTH D I Fl:'. 180 100 280 200 3:30 300 480 400 580 500 680 600 780 700 880 800 ?~80 -~00 1080 100(} 1 180 1100 1280 1200 1380 1300 1480 1400 1580 1500 1680 1600 17:30 1700 1880 1800 1980 1 '.:; 00 2080 20(}0 2180 2100 2280 220(} 2380 2300 2480 2400 2580 2500 2680 2600 2780 2700 2:=:80 2800 2980 2900 ::: 0:30 3000 :2:1:30 3100 3280 3200 3380 3:300 3480 3400 3580 3500 0 0 0 (-_} 0 0 0 0 0 0 0 0 0 0 0 0 1 ,., 3 7 ll 17 23 :32 VERTICAL CORRECT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 3 4 6 6 RELAT I VE COORD I NA]"ES FROM WEI_L-HEAD 0. ~:}0 0. (:}0 ("~. 00 0.0 0.00 0.00 0.0 0 0.0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O. 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2. 16 N 2.9:3 W 11.78 N 9.57 W '~=:,.28 N 12.44 W 45.19 N 12.11 W 68.9~ N 7.47 W '~6.46 N 1.5'-' W 1:,~, 20 N 14 14 E 207 ._4 N 22 31 E -410 H-20 . c.,L B.=,EA DEPTH DATA tNTERPaLATED FOR EVEN 10i) FEET OF '-' I"' ....... -]PTH 3724 38:38 395:3 4081 4205 4329 4453 4577 4700 4824 4947 5069 51'-72 5:314 5436 5559 5680 .j,-, (.) ~_ 5925 6,048 6171 6295 6420 6544 66,68 6790 6'FY 13 70:34 7155 7274 7392 7509 7625 7741 ]"RU VERT 'SUB :SEA MD-TVD VERTICAL · -.~- I '! "-,"' DEPTH DEPTH [J IFF L: JRREL. I "'Y'o =, ,.,':'r',., 3600 44 12 · _,7o ) 3700 5:R 14 · :"="=',F) 38,[1) C) 78 2(') ...m ~..~ ~..m . -- . :'::980 '-"- ] ' o -/t 0 101 ":' ''a ' m"! ' .-, .~.."~ 4 (.),:, 0 400 i") 1 ~ ._ 24 4"-'0 24 .~ ,:,., 4100 149 4280 4200 17'3' 24 4380 4:300 197 24 4480 4400 ~.(.""-' -) Lc:'-"- F,'-',', 450i], 244 24 ._ ~"mV 4680 46, 0 ¢) '-'z:/:,7 '2:3 4780 4700 289 '22 o,R ¢) 4 :-R, 00 31 ':' 2 :':: 45) 8 I') 49 00 :3:34 ~_z.") '-' 5080 ~ ' ' _ _ _ · _ o00 :'-: ?]/-, 22 5280 5200 400 .~ 21 % ':,,:, F~ 5300 422 ....... .__ ~;~" 548£) 5400 445~-~: >sc,' 55:30 ==' ' ._,._,i.)ij, 46,8 .... 5"-'") 5600 4'F/i ~ ~-:~ ...~:,,. · - OOk. ... 57:30 5700 515...,_ 5880 5800 ._ 4(. g.,,. - ?qgAO 5900 5 Y-,4 ~-' ~ :-'~ 61 ::: 0 6100 610 ? 22 .~. 6.ol. 62C)0 633 ?]. 23 6380 6300 6,54 = .... 21 6480 6400 675 21 658 i') 6500 6, 94 19 6680 660¢) 712 1,_,° 6780 6700 729 17 6880 680¢) 745 16 65)80 6900 76,1 16 7080 70¢)0 776 15 RELATI VE I]:C,]RD I NATES FRCIM WELL-HEAD "~'=;=i. ':'"~' 01 E .,:. .... 1(7.) N ,_.,. :310.41 N 44.:38 E 374,43 Iq ='._,,-_,"". '?' 2 E 444.98 N 72.'"'=' Y._, E =..ff.; 17.04 N ::': 7, L'),=,'"' E ~:;Ir.,,-, .,. _ .._4 E ..... .o. '.-.~ 6/_-.0.42 N 116.":'/-._,_, E 7:'-':1.55 N 1:31.54 E m"~ i' ."m ,- ,=, .) z.. 4:~ N 14 7. ():B E . 8'72.6.7 N 1 ~._. 70 E 'FY 42.2.4 N 181.7 :':: E 101 ('). 6.8 N 21')i')..51 E 1 (')7'FY. 28 N 21 :B. ?._, E 1147.24 N 237.19 E 1214.6,8 N ..._,'-'~.:,. 0:3 E 1281.92 N 275.57 E 1:2:48.77 N 295.70 E 1415. :30 N 316. 11 E 14:B2 '-¥ . · o:. N :335 18 E 1551.s3 N 354.56 E i 621.45 N 374. ?"-'o,:,E 16,~z.._.~9'-' % 9 N 39:3.7o E 176:3.93 N 413.34 E 1834 88 N · 4 ..... 94 E 1904. :--:.5 N 454.2:B E 197:3.40 N 474.¢)9 E 2041.25 N 494.00 E 2107.3:3 N 513.4:3 E 2171.90 N F,:c:2 08 E 22:34.10 N 550.11 E 2294.56 N 567.98 E 2:352.75 N 5:35.91 E 2409.06 N 603.'.78 E 246,:3.62 N 620.92 E 2517.53 N ,~,._,~. 07 E II0 H-20 DATA INTERPOLATED FOR EVEN 100 FEET OF SUBSEA DEPTH 2-10-:33 :AS. :PTH 7970 :3085 8199 8313 8427 8542 8657 8772 :38:37 9002 9119 9351 9583 9813 9928 0042 0155 0268 TRU VERT SUB SEA MD-TVD VERTICAL DEPI'H DEPTH D IFF. CORRECT 7180 7100 790 14 7280 7200 ' 805 15 7380 7300 819 14 7480 7400 8:33 14 7580 7500 847 14 7680 7600 862 15 7780 7700 877 15 7880 7800 892 15 7980 7900 907 15 8080 8000 922 15 8180 8100 939 17 8280 8200 955 i6 8380 8300 971 16 8480 8400 988 17 8580 8500 1003 15 8680 8600 1018 15 :3780 8700 1033 15 ooo¢, F:F:O¢~ 1048 15 8980 8900 1062 14 9080 9000 1075 13 9180 9100 1088 13 RELATIVE COORDINATES FROM WELL-HEAD 2570.67 N 2622.95 N 2674.70 N 2'726.37 N 277'7.52 N 2828.56 N 2879. E:7 N 2930.86 N 2979.94 N 3028,90 N 3078. :39 N 3129.43 N :3180.58 N 3232.49 N · :,.-,o.:, 07 N ._, .- I...~ ._, · 3:331.90 N :3379.00 N 3424.29 N 3468.65 N 3513.41 N :3558.58 N 655.76 E 673.94 E 692.78 E 712.62 E 73:3.98 E 756.81 E 7:--: 1. :3:3 E 808.46 E 836.87 E 866.06 E 896. 10 E 926.46 E 957.21 E 988.74 E 1020.10 E 1051. i7 E 1 o81.9:3 E 11i2.2.=_; E 1141,57 E 1170.26 E i 198.32 E tI0 H-20 DATA INTERPOI_ATED FOR~ EVEN 1000 FEET OF MEASURED DEP]'H 2-10-83 MEAS. ]"RU VERT SUB SEA DEPTH DEPTH DEPTH RELA]'IVE COORDINATES FROM WELL-HEAD 1000 1000 'P20 O. 00 0. O0 2000 2000 1 '.;~20 0.00 0. O0 3000 2~?/8 2'~)18 2?/. 25 N 12.63 W 4000 3'~15 38:35 :3'~8.4'7 N 63.66 E 5000 4724 4644 ~772.20 N 18'F~. 'F~7 E 6000 5542 5462 1525.16 N 347.08 E 7000 6352 6272 208'F7.14 N 508. 12 E 8000 7207 7127 2584.66 N 660.55 E ?/000 8077/ 7'FT'F/'F/ 3028.06 N 865.55 E 0000 8'P44 8864 :3452.50 N i131.01 E HORIZONTAL VIEW SOHIO- ALASKA PET. WELL H- 20 RADIUS OF CURVATURE SlNCLE SHOT SURVEY SCALE: I"= FEB. I1~ 1985 9200 8800, 8400 8000~ 7600 6800- 6400 6000, 5600 5200 4800 ~ 0 4400- .,~ 4000. TVD = 9~235' TMD =10~330' ALL DEPTHS SHOWN ARE TVD 3200 March 1, 1983 Mt'. Gat~ Plisga Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job No. AK-BO-30017 Well: H-20 (SEC 21TllN R13E) Prudhoe Bay Field North Slope, Alaska Survey Date: February 21, 1983 Operator-Samec Mr. Plisga: · Please find enclosed the "Original" and sixteen (16) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. Thank you for giving us this opportunity tobe of service. Sincerely, NL SPERRY-SUN, INC. Kirk Afflerbach Disctict Supervisor Enclosures ......................................................................................................... :---;P ERRY'=~3 N-'W EEL-':S1-UR VEYING-T~ CD MF"A'rqY PAGE 1 :/'.:' ANC:HORAGE ALA~ KA '- ...... r , : .... .-,JRVEY FEBRUARY 21 '.--;OHIO ALA.,,K.A PETROLEUM L. JMFANY DA]:E" OF '"'1 , , FI-20 ( F;EC'" 21 "T 11N -'- R 13E) .................................................................... ~]OMF'HTAT I ON [rATE BO ...... --GVRO._-,COFI _C .-,URVE¥ I-'RUDHFIE BAY FEBRUARY o.-, ,.?,-,.-, I , ~.~, i r. ,_-,.z, ,_lOB N JMBER AK-BO-:30017 ALAF;KA KELLY BUSHING ELEV. = 80.20 FT, ....................................................................................................................................................................................................... -'----0 PERA-TOR---B';~'MEC ........ , : ,, . .. .,. VERTICAL SECTIFIN CALCULATED ALONG CLOE;LIRE ............ !.' ' ' 3',. '/':. · :.i.. ,. , . .............................. TRUE ..................... SUB-SEA .............. ;-'F.. j I'JRc, E"- .................. L. UUIR.:,E-" ................................................................. DUG-FED TOTAL MEAtsl I - C:AL VERTICAL INCLINATIF~N -'_REu VERTI DIREC:TION SEVERITY RECTANGLILAR COORDINATES VERTICA' DF'F'TH DEPTH DEF'TH DEG M I N q'-;]'-"-'-~' . -,-. n,.- ~. BEG/lO0 NORTH/SF~LITH EAST/WEST SECTIO,. 0 0. 100 100- ..... 2AO -200; 300 299. 400 399. ........... 500 ................. 600 5~. 700 699, ............... 800 ........... 7':?? '200 :=-:9'?..08 :E: 1 '.'?. 7:: 0 24 Iq 4:3. 0 E 0. 12 1.52 N 1000 '2 'P .0 . ';7 8 91'F~. 78 0 20 N 41.80 E O. 06 2. O0'N i 1 O0 .... 10~?~'78 ............ 1-01"2 ;"78 .................... -0 .... 16+-2 .... -N--36'-."30 'E --: .............. 0 ;-'07 ..........2T'4'4"-N ....... 1200 11.0'.-?.98 111.0.78 0 10 46. 0 E 0.14 2"76 N 1300 12'P'2.98 121'.9, 78 : 0 I0 :. N 76.3'~ E 0.0~ · : 2. ~0 N ....... 1400 ........ t'399;-:-78 .......... 1~._::1'..-~;-78 ............... :0 ..... 1-4': ..... : .... N-51":'60 'E ............0';-11 3;-07 '-N 1500 149'S/. 98 141 '2.78 0 10 N 35.50 E O. 0':? 3.33 N 1600 159.0.'2:E: 151.0. 78 0 11 N 52.10 E 0.06 3.56 N .... 1-700 ............ 1' 6~97 ;-98 .......... 1'6 I:? ;'-78 ............. 0 ....4 ........ N--1-7~:::r-E- ................ 0 ;"1'4 ............... :5%-74"' N 1800 17'.~'2.'.-78 1717.78 0 I0 ' N 46.1'~ E O. 12 '3..01 N 1900 189'..-7 98 ~ ':' '~ '~ ' · ~,~ 4.87 E 2.96 5 '~ · ~1 E 3.55 :.'::. 5.90~:::E:-: :::: · :' 4.46 ::..i;:.: :::::: 6, 16' :E:::::::' ::::: :.. 4' 6"' '6-;-. 48 :E ~+. 9...'~,.._, 6.73 E 5.25 6 96 E =' 55 , ~.!, 7.--12 E ' 5. Z6- 7, 26' E ':: 5.97:: 7.50 E · 6.24':' 2100 20.07. t-?7 201~. 77 0 9' N 87.30 E O. 1'2 4.40 N 2200 21.9.0..07 '2119.77 0 7 '.S 73.10 E 0.06 4.37 N '- 2300 ......... -'. "~':~9-' '9~ ,.-' ....., 2217;-77 .............0 .....-~ S'-72 ;---O-"E ........... O'TOZ~ ~;'30 "'N · ..4 JO 2397..9.7....-,. 1 9.. 77 0 10 ._,~ ,....,. 80 E O, 06 4, 16 N 2500 249.9. ';'7 .,,zz J ,:~ 8 . . . ~,- ....77 0 S 39 iCJ E 0 06 3 97 N 2600 ...... 2597;"-77 ........ 251'?;-77 ...........0 ...... lo ........... '=- -0...'0 o, oI 'lq .... .. ,., 1'6'. I:~-"E ................. "' .................... ~ ...... 2700 2679'. '27 261t?. 77 .'0 47 N ,_¢,.A'-' 30 W 1.02 3.60'- N 2750 274.0. c.:,,/.. 2669.72 ~,':' 55 N 55.19 W' 6.33 4.70 N 2800 ........279'2 :'7 I' 7.98 E 6.66 8.23 E 6.71 8.47 ~ ~.7I- -- , 8.73: E 6.66 :. 8.94 E 6.55' ?.-;-09 E 6.25 ' 8.53 E 6.07 6.80 E 6.58 ..... 2719.51 .......... 8 ....... 2'1 ............ N""4'1-. 80"W ............... 5;~37~ ...................... 7';-74 "N ........ . . :: :: · ::~!i:::::::~:: :::: :,::: :,ANL. FIORAL'~E ALAc, kA SOHIO ALASKA' :;(;: . ;. ;;:; '.; :::I:~A'i'E 'i :.,=; , ~ ::: ::: : ti.F URVEY FEBRUARY :21, 1983 ~-,YRUbL. UP'I-i_. 14-20 (SEC ""2i'--T 11 N' "R i3E) ............................. ¢ .................. - ............... : ......... -CL-il~IF'iJTATIDN--DATE .................................. ,I '" "-'"':., lO:..]":: ,_lOB NUMBER AK-B j-._..,O017 PRUDHOE BAY FEBRJARY=..., .. _._ " ALASKA KELLY BUSHING ELEV. = 80.'20 FT. ~ ................... ........ ~"7 -'"": ......... ,,, VERTICAL SECTI ON CALC:ULATE[}:::ALONGi::cLoSORE:: ;::;!~ : :: TRUE=.:::..=:, ...:'..:...'..SLiB= SEA: '~.:..: :i:: ..::=-.CO. EIR SE. ==~.L?Cdi RS.E .............. riOO=l-.-EO ....... I'O'T~'[~ .... MEAoLRED VERTICAL VERTICAL INCLINATION DIRECTIAN SEVERITY RECTANGULAR COORDINATES VERTICAL. DEF'TH DEPTH DEPTH DEG M I N DEGREES DEG/100 NORTH/SOUTH EAST/WEST . SECT I O. 2900 .':,:~,:',~ =,,= c,c,.~ ,=, - ~ ,-~ ' .=, 25 : :: :::::: ::::::: :: :: ::: : 0 19 W '4.08 ' 46 N ::l' 'oe:n ................ ~'o,'¢:-.-'o'¢. ............. ~o_" '"'~, ..... ...................... ,--¢" ... vl ..',., o "~ ..-. ~,~, W = ..... ~ ~-~ .... ..~, ..',_,6,=,. I.~6 ; ..... I-6 ............ N ...... 5;'B'O-W ............. '~"- 3000 2997.49 o,.-¢ '.-.'9 . '-'~ ~.17... 10 42 Iq 0 80 W 3.31 · ~,._, 74 N · -, .=,. .~, ,_~) .~c~ o100 30'~¢~... . ..-6 3015.06 1'-'.=,~,4 N . · ~ .. E .=,'-'. =..,6 56.61 Iq 3~"'~ ................ ~'-~'~-'w4 .....'"'~ ' "-"'= .................. ~-~'- ~'' ............ ~',"46' :: .~OT87'"'iq ~vu ~z....--,.~c o~.I~....6 ~4 ~,o...:. ~I.~. O"E : '-~ '-~ ~" '~'-~ 0~ ~'~ '~'-~" ~ ' ~,..-)o ~,~,~,.~, :::;: ¢~uo 03 · ~7 Z~ .30 E 2. ~"~ , = 3400 .'=, ,", o .,, 330.2'" 87 ~,¢~.,¢. 07. ............ ~"1 ~'--~ ..... :,rl~ .... ~- 2- -. - .--~ ¢-, ~-~ - - --~ ~. 3500 .-,'.,,./o. ~,...,.',.=, .. o...' ._, 3/.",00 256,q '-'=- .'-,.4,-,,-, £}5 - _ . ..'~1 ..=,..T ,=, 42i · ,.. 7 .) o '-' / =':' ':' o .:..=,-, o 0 3 ...... ¢'~ .-----v ......... ~ ~T_"-.1~1 ~.~' 3800 o745,/~; ~66~, · ,.. ;6 '19 44. N 13.19 E 2.61 : 1~,~'9..00 N · , : ..'. ~..=, 174. ~ l ..... N' "22 ....... 10 'l~ I'0;-:_'49- E ....................... ""~ ...... =': ............................... ri' 24 30 N 10.10 E .,_'.'::", 32 .,..'.':' 12 . '-';, ,=,'-' N 27 1'-' .- · · =, N 10. q" '?. '=' ~ 5 ,_:.,' E 75 :_=:7 N ........... '~'"' ...... o. 3..., ~t)~..-.., "~' b~U ¢~ .... N---1-1';-60'-'-E' '":-'-~ .... '-'""-:~-'"-";= · =,7._ o. 30 '-"-' . . · :':: 900 3830 50 '-' .=,' ":"-' . o.:, o.=, N 11 30 E .=,,"' 00:': 355 27 N .."% : : 4000 ,..,..'="-'?'~ ":-'.,.~, 56 ~oo-'-.:"4-'-''--''''~ 3/-,_ 06 8 N 10 .30 E 2 ,64 411 . ,_,~ N __ 4100 '-,,-,e,-', .,-,'0 .......... 39'-'-"' '-""~ ..................................... .... 1.-'. ;¢; 3'~; ...... ._'.-"3' Iq-i'0 19'-E ...... 0;]7 ............. '4'?_--g;-61-'N" 0 2' .. -~, · J.. . · 4200 4073.78 3993.58 36 ll N 11.10 E 0.57 527.78 N 43A0 4154.47 4074.27 36 l'-'o N 11 .69 E 0.3A_ 5:-=:5.6'.-? N 4400 ...... 4235;"2'I ...... 4'155, 02 .6 4 ...... N--12';'-60--E 0-255 E,,21z~4 4500 4315. c~8.. -,-~'-'"-'~.- ._, ~. 79 .=.~'-', 11 N 13 . 0 E 0 ' 2A_ 700 · I__~l N 4600 4396.72 4316. ="-' · ~,...' .36 7 N 13.50 E 0.30 758 s.'9 N 4700 - - 4477;58 ........... ~'~':¢~- "R'-' -'-~- ' '- · · oo. 02 1 · 3(:) W 53.42 ','-~.~-- a-'~ -,-. ' ~_-~''-~'" ~. o:::: .:.':77=~' .......... ~O .E'::: :::::::..',::. :::: :: :: :,:1 ~ 6.:86 ~.~o = 172.39 c'~ M1 E 21i 37.47 E 254.87 ,57.44? : 355' 89.60 E 52~. 54 101.27 E 588.21 I 13." 9'':' E.:. 12~. 75~ E: ~<;: ~:i'705. ~0 ' :::~'~' 140.27 E 764.3~ ~" 4800 4558.51 4478.31 35 5:-=: N 14.19 E 0.29 872.4:-=: N 4900 4639· 65 4559.45 35 33 N 13.80 E 0.49 929.1'.-? N ...... 4640 ..... 35 ...... 12 .......... lg '"l-3,"6g-E 5000--- 4'721 ;'-I8 ...... .... ~6 5100 4802.84 4722.64 35 18 N 13:30 E 0 25 1041 N 5200 4884.53 4804. ~.'~' 35 8 N 13.10 E O. 19 1097.71 N 5300 ...... 4966]'41 ........ 4886, 21 ...... 34 ...... 55 ..... N -13;60 E ............. O, 3'6 ....... I'153~58 'N 5400 5048.39 4y6u~.19 34 55 N 13.80 E 0 I2 1209 ~ N 5500 5130.50 5050.30 34 40 N 14.10 E 0.31 1264.5~ N 5600 5212·74 ' 5132.54 34 41 N 14.1g"-E' 0.06 .... 1319;76 N 168.27 E 881.64 182.41 E .939.74 -- 1-g~':-l-7-E . '..~97,67 209.65. .E 1055' 2 222.82 E ii12.68 ..:. ......... 249.63 E I226.99 263.39 E 1283.91 ........ 2~"/7,'-30--E I'~z;O.-~ . 823.06 ,..PERRYmolJN g/EEE :,URgEVZNL, OuMPANV PAGE ANCHORAGE ALASKA SOHIO ALASKA PETRu -~1 COMPANY ~ 'LE_M DATE OF SLIRVEY FEBRUARY 21. 1983 H-20 ( SEC '21 ....... l'fi N R 1 ~,E] i]OMPIJ'TA'TI'ON--D~T~ .......................... BO~-'i]VRO~:i~iP ' ' I - ; ,:,.:, dOB NUMBER AK-Bi]-:::O017 FRLDHUE BAY FEBRUARY 22, ic~'-'''' _ _ . ~LASKA KELLY BU..qHI'Nb-' ELEV. = 00.20 FT. VERTICAL SECTION CALCULATED ALONG P_.LO.:,URE'-' ' ......................... TRUE ................... ~'l "~ .... ' ......... :,L B-.:,EA ................ cOU'RS~ .......... ~'OURRE ................. BOG=LEG ............................... TO~IZ MEA~,LIRED VERT l CAL VERT I C:AL I NCL l NAT I ON D I RECT l ON SEVER l TY RECTANGULAR COORD I NATES VERT I DEPTH DEF'TH DEPTH DEG MZN DEGREEB DEG/100 NORTH/SOUTH EAST/WEST SECTIO, . ~ .,.. . . 5700 ~'~' N. 1 ~ 3C~ E '0. i 2 ' ~' :' .. I'397 ~,~4.96 52i4.76 34 ' 41. . .1.:,74,72 N' · '2~1'36::'E · . . 5800 5377 18 ~'-"- . . '~' ' ]'-' 'R~ ' ' ....... .... ._,~y6.9::: :3'4 ~1 .:: N' 14.60 E 0.12' ..: ':14c, o. N .O5.61~.'E.:::~ '.~'~ .... , .... 5?00 ........ ~;'"~" ...........~" ': .................. ~ .......... ~ ...... = ....................... ~ ....................... ' .... '~-=':'~-N .......... ~~'L ~, E ..... ~,=, ._,c, 79;'08 .:,~ .... , N I~. 69""~E ................. O. ~4 i~ ..... ,. ~, -)'~ : ..... : ...... ':' 1 6000 ~ ~ A 1 04 ': ' '"' ~ '~'-' : (' 'q':' · _46U 84 .:.._, N 14.60 E 0.46 1.,4J.77 N ..,4.62 E 1568.76 ~ 100 5622.34 ~ ':'~ ....... .... 42.14 .... 49 N 14. A9 E 0 4:3 1597:30 N q4'~.34 E 1626.87 6200 '-~n" "~ ........... ~ "~ ........... ~; A300 ~7::::~: 7? ~C"-' 59 :36 21 ' N ' 14 '"P ' · . 4 N 37~. 04: E ,. ,' ::, 1744. o., E 0'26 ':1711.~ 6400 ~,,:,o4 .:,7 ~S'~om ,:, 36 15 N 14 80 E 0 11 176e.,78 N '"¢ · ._ ,~,~, 1"' . .... =,~4, 17: E '~. "'.' 1803, 80' '?' . · ~ ..... m ...... o~00 5944 98 586-~";-78 .............. 3'~; ........ I9 ........ ~ ...... N--I-~]' A'O' E ..................... 0]-"i~ ...... ]"~;703"'-~ ~0'~219'' 'E 1862,88 "":'~ '' - .... ~-. N 14 60 E 0 ~,_, 1 17 N 424.07 E 1921 6 u 0 ~- n .:, ~ 68 H 945 48 :36 ':' c,,:, ,-,,:,.-, 6700 6106.79 6o26 ~'- . .,,;~ ..,._ 33 N 14.67 E 0..49 19::9.. _. 77 N 438.87 E 1980,22 ........ ~ 0 -- '~ ............ ~ .... . ~,~ ~ ./~l. ,:,~ o,_,00 6188, ,~5 6108 O: ............. 35 :20' N I.., iO'E ................. 0''''?''~ .......... ~ ~'~-'~""" ~'~--'~~~:'~'~' ~"' 6?00 6270 14 61 o,- . ·. . ,..~.94 3~ 41 N 15.10 E 0.6~ 2051. ,~o.':, N 468,7:3.E 2095, 7000 ' '-'~'-' 6272 ~'" o.-, H,-, . ' o~,._,.~ 7I N : 10 ~' 05,68 '"'" 2151 1.. E 0.73 1 N 4oc, 42 E '"' ' 7100 .......... ~-~<,~'n9 ......... A:n~';-~;* ........ ~'~ '2o~ ........ ~ ............ : .... ~77S~ [ .................. z ........ N I._, iO'-E 0~50 ............ ~-I~9727--N . _ 2207 7200 6519 66 643? 46 q':' 44 N 15 0 E 0.73 <"-' . . ._- . .~1'-' 02 N M12 06 E ~6'~ 1.74 7300 6604.04 /-_,~5":":'~: ~,. 8432 ? N 15. ~10_ E (3_. 64 ~'-"-' -.:, '~ . 78 N 526.1 ~:- E 2315.33 . . 7400 ....... 66E:~" I-2 ........ 6608'. ~3 ....... 3i ........ i3 ......N-'i-G';-O'E ............... 0-J'~77 .....2~'I-4~'35" N 5~D]-4~- E 7500 6774 ..... P'-'_,o A694 63 30 47 N 16.3~ E 0.4? ~,6~"'-' '~ ~A'-' N 554.A~1 E 2419.32 7600 686I. 11 6780.91. 2? 56 N 16 .6~ E 0.85 ~41°~. ~,'~":' N 56'~. 20:' E 246~. 86 . .... o .... .~ ..... ~ - ~ ............... ~ ...... %-~ .......... ._ .~ ~Y.47 ....... 7700 .... o ~ 4 :. ~ ~ 6 .... 6,~ 7~ ~ .~,4 ~] ~,..:, ~ : Cg-4'I .... ]~"86-N'-~~-~4-E .................. '-':" ' ...... 7800 7034.96 6754.76 2? 25 N 16.60 E 0.18 2507.07 N 7?00 7122.38 7042.18 2,':: 40 N 1/:,. 50 E 0.75 2553.61 N "8000 .......... 7210";--I i ......71 ~. ? I ................ 28 ....... 4 ! ..... ,-N --I7-.-'30-' E ................... 0.38 ...... -2."59'~:53 -'N 8100 7277.?.0 7217.70 28 32 N 18.10 E 0.41 2645.15 N I[--i.--I ' ' ,:. ~ U 0 7'~ ::: 5.66 73 ~] ~, 46 '-"':' 45 N 19 '-' '- .......,:.._, o ? E 0., 66 2A'.:;'O_. . ?,4_ N 8300: ........7473;"37 ....... 73~; 17 28 "37 ....... 84.00 "' ~" . 2 ::: .... .. . . / ,. o 1.02 7480 -"-' .3 b:..- _ 5.:: N Z~ E 1 1:3 2780 14 N 8500 7648.39 7568. 17 29 1'? N 24.69 E 0·77 2824.56 N 8600' 597.33 E 2568.69 611.16 E 2617· 22 -- ~ZSTI-1 E 639.67 E 2713.0.~ 655.08 E 2761.02 --'E-/I-.-70' ' E 2809; 0 687.73 E 2857.01 70?. 75 E 2.905. 2.954 ;i 8.' ~'::: ,,.- - ,-- ...... a: Il F'] ' : : ::: : .:.:~.:: ......... ~..~::~:': ~..: ' ..... '::: '. :: ::: :.,LRVEY.:'FEBRUARY:,:,:. c.,uHIu ALA~.F.,A PETRLLE.M .,LMFANY..:::.~? : :.:. _ .: ' I H-20 ( SE:_:-"' :z"I .... ]-,~-1N-1-- ]~'~l[)--- --TSOMPMTAT'fON DATE- BEFSo L, iYr~o.:,l...L I-- ]: .... hlVl..- Y PRUI]HOE BAY FEBRL ARY ., t ,_.7; 80 · '-' ALASI<A i<ELLY BU..HING ELEV. = . ~: FT. : !]:': .: :i: &?:. . l MEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEPTH DEPTH DEPTH BEG M I N DEGREES DEG/10(.'1 NORTH/SOLITH EAST/WEST 8700 ~ 7,~,~.--,:i0:,:):,f::.~:7742:-':i,1:['~ : 2'-" ' '=' '-" ' ::--''::: ...... :: '7~'" 70 8800 12~] :18I I ] ]::'::N1129:'8':--/ E: 1.22 C :2':":,'56;.:7/.~ N ': i: ::i~!]i!776, ......... 8900:-': ......... :'79 .':":'6.:. 52L:"-~-";791''6 .';:32 .................... 29 ....... :-6--: .... --'NI':':;O-;'6<.?'-- E1: ......... iL., ...... (r;'-4'::: ........... : '2'..-~P8-;'8 .'.~'"N 9000 8083.59 8003.39 29 4:2: N :30.30 E O. 72 2,'041.26 N 826.11 E VERTICAL SECTIO o147150 9100 .......... 9200 9:300 9400 9500 9700 ::: 169.94 808'P. 74 30 46 N 29.60 E 1 ' ()4 ~:084 ' '1~"]~I N 851 ' 29 E 31 ~6' 85 . ':_-','255-;'5iS-"'~ .... ,:,"','"'-'"~-":'/.~~. / ,.,. ,., _, ..................... ..R .,.'~ ...... ' ~ ..... ":' 8::44.¢~ "= . ! 74,7& N 903 1:3 30; ,:,.,.<., 60 , 75 .:,1 16 ":.N :130:.60 E 0,"~'~ ::: '-' - . '~"~' " 8o46 2:-': 3:1 14 N 3r} 69 E 0 07 .... . ,_-:'~ ."-(:,. 40 :' "': . - · ~__.: ,_ ~ ~.. ~- C, -.._ _ .. :=:5':.-~?. O0 :3518.80 2:3 45 N :--:6.69 E 2.01 2::2:02.37 N .987.16 E 3445.68 8686. 'F;5 8606.75 28 4 N 35.89 E 0.77 :3340.72 N 1015.33 E 34.90.88 9800 .... :3774-;-~..'4-~'--:-=:~.Sh~-~ -'-28---40 ....... N o4. IO. E . !. O~ ,_.,7~. · ,..: ~ ,:, ,:.. ., .,:. .:, o N ':"--" ,.9 E 0..0,2. I ~I ~ I I i ,z.l~ Il, 0000 :'IR':,"50 -=; ' ' q'-''l'h':, 30 '-'"' ..... U ,...':'--'..' 41 N :31.10 E 0.,/_..,4 :34.60,,4::: N ::. . . · .,,ff.l.~ ........ IC,· ."._, ."C, . ..,D .Il· I?~'E ......... ~ ....... Ol'~."-~::~' -~---'--~.:~II0~-~-.'3'9 ' N' 0200 91 .-6."" 7~ '::..,'046.5~" - '.--"745 N 3n ...... 5:['} E 0.4._=, ~54:1. :E:5 N 1_142 rr.-' E :3721:3'::" · O._l,. 1 7 N i ! ~5. A='' E :37~ 86 ,n :300 '-7.,. 215.26 9. i .:,'-'..., ='' . ,n. 6 27 45 N :30 . F,_ 0 E (Il ()0 '-' = '"q .l · ,.-/.. _ ._, . ''-"TI' '."--/24 lZ.:.7 4.- - ..... N o0.'5¢."I-'E ..... O'.-"OC'.F ..... HORIZONTAL DISPLACEMENT = 3780.50 FEET AT NORTH 18 DEG. 4 MIN. EAST AT MD.= 10330 . BA._EI] F~N ]'HE USE OF THREE DIMENSIONAL RADII IS OF CURVATURE METHOB THE CALCI_ILATIIZIN F'RriC:EDURES ARE '..R-- _ - - ................................................................................................. SPERRY-.=..,.C;FiN-WEEL,-SURVEY-ING--CO MP-A Ny ANCHORAGE:ALASKA SOHIO ALASKA PETROLEUM COMPANY '=:". 14-20 ('-SEC 2.t' -]'l'lN'"-RI-3E )- ....................................................... q]:.OMPUTATION-DATE F'RUDHOE BAY FEBRUARY 22, 1983 ALASKA PCFOE ' 5 - DATE:.OF ;:,URVEY/.FEBRUARY 21, 1983 dOB N_IMBER AK-BO-:300!7 KELLY BUSHING ELEV. = ........................ OPERAT.OR=S,i~MEC 80,20 FT· I NTERFLLATE[ VALUES FOR EVEN 1'"000 FEET OF .MEASURED DEPTH :" ...... 1 R JE ;=, JB-.:,EA TOTAL MEASURED VERT I CAL VERT I CAL REF:TANGLILAR E:OORD I NATES; MD-TVD VERT I CAL '")" 2000 1 '.~?? · 97 3000 27'P7.4?,' 4000 ..... 3.'.',' 12 ;-56 ........ 5000 4721· 18 6000 5541.04 7000 ....... 6352,"'7t :3000 7210 · 11 '~000 8083.5'F,' 10000 ............... 8.950 ~' 50 10330 9241.81 1 '-?. 1 '.~.. 77 4.._ i N 7.74 E 0. ¢..:,]'" 0 .01 2217.'~'~ '-'= '--' 09 W ' ':' 4L~ ~... ..:.._,. 74 N ..,. ,.'--" 51 '-48.'32:- '~-/: ..... : : ==========================..: ? :: :.::~ :~:; ..... : : '.;'::'". .- · ,-, =,' .......... : ............ 4i-'1",--:3:~-N ............ 68.-13"E .....' ......... 87T'44" --8-4~, ~3 4640 o,A,= : ::::... o~,,= :...,~,.431'N :::::: ~.96 17 E .:::~.'~ o,~.:'::~,,,~.: 1.9& ::"~'~ :::':'~::': · * '~,-~!~:'. :' :: :::i:i::: :i ':: "i:.:::: ::.'"i T :'!![:: :::'i .:. ' .::' ::'.? ' 5460.84 '::: ::::::: .':1. 540!'. 97':'N:'..:::::; :334',~:,,'~.~ E : ~,,:~,""="" -.°6. :: 180,: .1. 5:::.: ' 6272;'52 ..............::-:'-2'-1-05-';'-e~8'-'"'N ...... 483T42'--E "'--"-"~*- ~"*' "=" .......................... '"'"'~' ¢'--'"~"'"' 0'~'/ · -'.. .L,-,O. ,,.~ -" 712'? 91 '-.' F, ,T¢,:? .=, '-, /- '-' F, - ...... ..:, N , 7:E: 9. 8'~ · ,. ,.:.-',- 11 E 142 60 '='"~']'-' 3'~ 3041 26 N '-"-'/- · · 1 ... Z_-. 52 ,:,..'=, 11 E '.;'iCg 41 "' ', 8870 ,' 30 ............... -3460.--43'--N~-1'0947' 05 E ..................1049;50 $-,~712~P 9161.61 35.94.01 N. :"' 1172.74 E 10~'=4 1'.~ 38-6.9.: ' . .,~ ... :. ::.: :::.:,:: .,. THE "CALCULATI ON'-PROCEDURES--ARE- 'BASED-ON THE E.=,E OF -'THREE-' D I ~FERRY-:=LIN WELL ;:.LIRVEYINL4 L, UMFANY: .... ::~ .:... :i:::~.y;: PAGE, ' . : '...' :: :~ ' ::. :. ' ANCHORAGE ALASk'A ': ,:::::: :?':::::::' .: . - '3 . :,URVEY FEBRUARY 1 1983 '.SOHIO ALASKA PETRbLEUM cOMpANY :"J OF '" ' ' ? I , F'RLIDHOE BAY FEBRUARY .~,c. :,-BE-._. ~, 1983 JOB NUMBER A~" -; '~017 ALASKA KELLY BUSHING ELEV. = ~0.20 FT. · : ~ . ~ :. :, :::IN~ERFJ?iLATEB 00: FEET OF sUB"sEA DEPTH ' ' ::'::: . , ]'RUE :,UB-,.,EA TOTAL \ MEASURED VERT I E:AL VERT I C:AL REcTAN.~LIL AR _.uuRD I NATES MD-TVD VERT IC~L · DEPTH ..................... ' ' ........ ~ i ~ ................. ~ " S ...... i- ' ' ~ '"-~ ' ' ~'-:~:~:~:':'~ .... =: ~' "':':' ~"' DEPTH , . DEPTH NGR~.ZEO[~ EA~7~ DIFFERENCE ~u~RE~~: ..... :, : :.,: '~: 0 0~:00:20 · ================================== 0. O0 :::"::: 0. O0 :, ' 1 '~' ' '-'0 '-' } ,:,0 lo.. ~C 100' 00 0 '-': . . ~.., N O.,E:4 E 0.00 0.00 2E:0 '-"-' ' . ~,:,ti 20 '-' '~' . . ~C0.00 0 47 N 1 44 E 0.01 0.00 4.,. 0 480 "" ' , ..:.0: :" 400. O0 O, 580 ~ =,-,n 2~] ::::2 500.00 ' ::.0.64:::.N -~. 43 E '0 O1 ~80 ................ ~80':'20 .............. ""-'~00'; O0 ....................... u. 7 ~:/ .................... lq ~"o.'"'c~""F'; o E- ..................... O':~i i .................. ' 780 780.20 700I 00 880 '-"-' ' ,:,0 ~) '~ ' . . , .~o :R0('~.00 1 42 N 4.78 E 0.02 1080 10ou.20 1000.00 ~,'~ 35 N ~,.~ ~H'~. E 0.02 1180 11'" '~ o~..20 1100.00 2 72 N 5. . ,_o E 0.02 1280 ................. ~'R '-~ ................... ~ ......................... F~$ '-~= ...... 1380 13E:O. '-' ' ~0 1300.00 ':' 02 N 6 41 E 0.02 14:30 1480.20 1400.00 :3.28 N 6.70 E O. 02 1'580 ........... 1580:20- .......... I'500':00' 1680 1680.20 1600.00 3.71 N 7.11 E 0.02 1780 1780.20 1700.00 3.87 N 7.21 E 0. 0.:00~ :::::ii:: 0.00 O. O0 O. O0 O' 00': . 0.00 . O. O0 O. 00 0.00 O. O0 O. 00 O. O0 ~,PERR9~ ..,Eil~. WEE[ .c, ORVEYI NL~ u. uPIP]~N~T ANCHORAGE ALASKA SOHIO ALASKA F'ETROI_EUML. LMFAN~ "'q TM ' H-20 ( SEC ""21 .... T'I'I'N" R 13E) ............................................................... COMPI'_IT-AT I ON-TDATE F'RLIDHOE BAY FEBRUARY~.'"'"~.-, 1 '-.4o.:,'-'"' ALAoKA · DATE OF SURVEY:'?FEBRUARY 2I, 1~83' dOB i',iUMBER AK-BO-30017 KELLY BUSHING ELEV. = 80.20 FT. OF;ERATOR~ MEg :.?? ::. ....... ~... INTERPOLATED VALLEy.. FORi: EVEN 100 FEET OF ::,I.JB-.~.EA .DEPTH 1,83 W 4.33 7.96. E 11.40 3.98 4. ?7 E 16.76 5.36 3¢~.. 48 E ~,Z'-"-. 76 9.11 39.67 E 44.62 11.66 3084 3080.20 3000.'00 53" 10 N .... t o7 .... I oU...'U .:, 100.-00- 77;"73-'- N 3291 3280.20 3200. O0 105.62 N 33'..;'6 3380.20 3300. O0 138.01 N 3504 ........3'480]-20 ......... 3400';00 ..............I75 :-5I-'N 361 "-: '~ -" - . o5~C~. 2£) 3500. O0 ~1~.'~' 41 N 3724 3680.20 3600. O0 267.19 N ]-RUE ..,UB-oEA TOTAL MEASLIRED VERT I CAL VERT I CAL RECTANGULAR ~ .... ' ' _.UURD I NATES MD-TVD VERT I CAL . DEPTH ..... :'-': ?:'"'DEPTH-" ':'. :':":':7'",yDEFq'H ........... "NORTH/SOILI~H:--7--TEASTTWEST .......... D'I'FF'ISRE~-'"' CORRECT l 8 :,0 1 o,--.0....'-0 .. 1800, .... l'.:,.so- ................... i ?sc); 00'": .................. 2080 2080.20 2000 · OC) 4 · 40 N 7 · :93 E 0 · 0:--; 0 2180 2180.20 2100.00 4.39 N 8.1'..=~ E 0;03 O. ........,.--: ..,OS"-~"= ..... .......... .. --.:~,:~'--"~]""'" ~· -. )'~-'----'~-"..:.. ,~00-· ........ O0 · ' ........ · ,. : · ~.c,,:,,-, o:.~,,-, .-, -) .. ::23<:)0, ~- ..... ,, . =,ou.=(. · -, o- : 8.91 E 0 0:3 0 · .' 4,..,0 24,".,5_-:0. z..)'-'c 2400 .00 4, 01':" N . ....... .~,-, .......... ,~,o.- .... -,q .......... ~:~., ......... .:,.--.: · "-,.~c,L! .'-,. _,u · ..'~. ~:,-'u~.~ "'00 ................ ~'-~"~'~-"-~ ..................... ~ ' 2&80 2680.20 2600.00 3.50 N 8.78 E 0.03 0 2780 2780 · 20 2700. O0 -.' .. ~..' ,: .-.~o:~. 2£) 2900 · O0 2 .=4: H 110 ALA~.KA F ETR~ LEUM ~COMPANY ........ H-20 (':SEC-'21 :~T-I"IN .... R~IoE)'-' ':' F'RUDHCIE BAV ALASKA FEBRUARY..-~_'"'-', 1 oq.-,o dOB IxlUMBER AK-BH-._~0u' ' 17 KELLY BUSHING ELEV. = 80~,20 FT. I'RUE SUB-SEA TOTAL MEASURED VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD-TVD VERT I CAL } ' ..... DEFq'H ..................... 'DEPT'H o~40: :~. o7._.0, zO.~,'. :...:..:::::..' .~.7(.)0, 4083:3980.20 3900. O0 460.19 N 76. 'P6 E 103.67 23.68 ' 4207 4080.20 4000.00 532.32 N 20.50 E 127.75 24.08 " .... ~'~ .6~ .: ............. 4 .... 1 .............. 4i 80'~ 20 44._,~, 4280.20 : :::~:4200.00 : =:~'~': ' ~"' ~ ' 457~ ~o~,~'-'°n. ~0' . 4r~O0. Oc~ : 746.56 ': N. ::::~?:: .~ :~. 1:37.46 E 19'F~'35 23.88~: ....... ...... 4703 ........44,_,u~ ' ---~'. ~ ~ ..... ~'~4t~u' ~" ..................... O0 ~" ....... 1 ~,c,~N .... .... ~ :.,4"--~.._,6 E" ............. ~~" 23.6~ ' ................... ' ........................ 4826 4580.20 4500.00 887.75 N 172.13 E 246.60 23.56 494? 4680.20 4600.00 ~57.30 N 189.31 E 26~.62 23.02 ...... 5072 .......... 4780:-20 5194 4880.20 5316 4980.20 4900. 5438 ..........,.S'fj,.. t ~ ] ..... ,.~"~ .......... 5 000-, 5560 5180.20 5100. 5682' 5280.20 5200. 4800.00 1094' 74 N ~.'"'-"'" 13 E 314.50 :' 00 1162.~4 N 238.34 E 336' 62 · 00 ................. -"'~ ...... ~ .................. I ,.ot~. 7,:,. N ...... --'25-4:-73 E ..... -~S~8-..-60 00 1297. ?3 N 00 1 '~' M. · :,o~ 02 N ......... 5803 ...... 5380-,-20 ~5300: 00 ............. 1-43~7't. ]~-N ..... 59'25 5480.20 5400.00 1'499.39 N 6048 5580.20 5500, 00 1567..93 N 22.45 22.12 271.78 E 380.23 21.62 288.82 E 401.84 21.62 .... {-~06 ~-I 4'-E ............ ~23.1 7-:' ........... -2 i .: 63 323.76 E 445.31 -21.84. 341.64 E 467.86 22.55 :SOHIO ALASKA PETROLEUM ' COMPANY '- H-20 ....(SEC'"-21--T 11N'-R13E') ............................................................ ~.OMPUTPfT:FON-'D'ATE PRUDHOE BAY FEBRUARY 22, 198:3 ALASI<A ANCHORAGE: ::ALASKA , ....,......: ..... :..: ..... · ' ~ ...... ':' 'DATE OF.".SURVEY.::;'FEBRUAR¥'::':':.~i', 1983 dOB NI.II~BER AK-BO-30017 KELLY BUoHINO ELEV. = OPERATOR- ~--S-A MEC:~.. INT. ERPC LATED VALUE~: FI:R.::. EVEN :':..1:'00... FEET. OF sUB-SEA I~EPTH. ]'I~:i. IE ~LIB ~.EA MEASURED VERTICAL VERTICAL ..... DEPTH ............................ I]EPTH ............. I]EPTH 80.20 FT. 6171 5680.20.:. 5600. O0 627t5 ............. 5780; 20 ............ 5'700-:-00 6419 5880.20 5:-':00. O0 6543 5980.20 5?00.00 ................... 7033 .......... -~38C-r;,-20 ........ --~;:E~O ;' O0 7153 6480.20 6400. O0 7271 6580.20 6500.00 ............. 7 S~E:.9 ...... 66'80 ¥20'---: 6-6~) 0.'00 7506 6780.20 6700. O0 7622 6880.20 6800.00 ........ 7'787' ~--'-~':;'80':~20 ...... 6:.~0070'0 7851 7080.20 7000. O0 7965 7180.20 71 O0. O0 .......... 807.9- ................ 7280.--20 ......... 7200700 81 .93 7380.20 7300. O0 8307 7480.20 7400.00 TOTAL REL. TAN_~LILAR COORDI NATES MD-TVD VERT I CAL ....... NC, RTHY'$0IJTH:----E'AST'/WES'r ...... D-i'FFERENCE-~-:--"CORRE'~iON 16<~7'..?0 N..:. .=.~, ..... 2 E 491.,.2'c.:' ~o.,.'41:..?:::.: ' , . .... , ,,..'..................... ,:,.. :....:,:, .: ..,.:..,..: ........ ..... . ,, .... :..; ._-, ~ o,o. o, ~- ...... 5~I5',::34 24' 07:"":': ..... '":":'"'"'::":; ':"'" .......... ':::':'":'::':::':'"':":""' .............. ' ......... .............. 1780. O0 N 397, 13 E ~'-'9 '~ , ~,o. · 42 -.'4.08 1 '-' =" ']'---' o..,l.~o N 415.71 E 563.51 24.09 -.'~-.'o.~- N': 4'88,24 E 2187 46 N . ~._,. 48 E .-,.-~ M,~ '.~ -"~-,-.. ~. 4 N ~'-'~' . ~. 17 E 2366 N :::. :":::: 555.7i E 2422,82 :N : .:. 572.. 37 E · ' '' 2531.44 N 604.59 E 2583.90 N ~20.24 E 2687.72:. N 654.08 E 2739.08 :N &73.04 E 672.86 6.91.64 709, 36 , . 726.05 741.8:::' .,':' 756" 91 ........ 771.70 785.70 813.57 827.58 20 ::::::::::::::::::::: 19.92 18.7.7 1:7,::73 . :.:: ::....'.: :: ........ :::::::::::::::::::::::::::::::::::. ,::,, 5:78 '::::: :.:::: ::::!:::,: ,,:'"':: "15-"0~ ': :::::<':'::::::::~' ...... "'"":::' :' 14.78 14.00 ., 1 ~:."95 '.. :. 13 .': 92 : ;:":::::: :: 14.01 ' '.,::::i :: ::':::' :::. :::"::: . : : · . :; : . < · ~,, . , ..~ · ,--~ ,.4:.: ' .:i:: ]:.: ~:.':i :ii::.: :: : :::::::::::::::::::::: 7 !:' :,:i' !! :iii:: :',::::: :':' :: · ;.' :. '.::;OH I 0 ALASKA ~'' fi FETR~LELIM~ .L:OMPANY .. H=20 -(.:,EL. zl TiIN~i.:,E) L. uMFUTATiuN DATE =' I ' o.~ =~,:,o dOB NUMBER AK-BO-30017 F'RLIDHOE BAY FEBRLARY~, 1'-'-"-' ALASKA , . I<ELLY BUSHING ELEV. = 80.20 FT. TRUE MEASURED VERTICAL DEPTH ......................... DEPTH SUB-SEA TOTAL ') VERTICAL REL:TAN_,LILAR COORDI NATEc. MD-TVD VERTICAL 8536' ................, 7 5,?,'01"2. Ct- ........ 7600;' O0 ""~,~,_, z~D. 80-N' 71'7 .-~',~ ,: '' ..... E 8651 7780.20 7700.0C) -..',.-9..'. 00 N 741.48 E 8766 "'"--"-"'"' ,,,:,ou, 20 7800 O0 '""' '" . ~ ;~4.,:.. 64 N 768.42 E -,..o..~,'°"---"-'-'"' .......... ,, :.,o,.,.-'~'~""" .,-'~c.~ .... .'"TT~O0 ZOO .............. :'2".']~I¥'O~c~:3i::ili,:; :i:i:i !:'i :3.':.?96 o080 20': '::18000 O0 : :3039;::58. 1t~ E ~ · , : ~ : ::::::::::::::::::::::: '~. ·. ; . :.. :::: ::::: · 9I 11 '-'180.'20 '~' :' ". ,--, ~ 1 o0. O0 3090 '2.:7 :' N :::::::::::::::::::::::: ~ 54. :31 E , , : . . 8:380.20 8300.00 3195. ~'">:-",~, N 91 ._.=, · ~.°7 E :346:0 · 20 8400.00 ':"-" .,.-46· 75 N 946.90 E ....... 858CT;-20' 78'500'700 ...........732,~4TIL .W'Ki7 ..... :.:1 ,-, .,...~._-,.-, , ,. ~,.-0.20 8600 · 00 ,.,.-,.-7. ,:BO N :':::.:::: 101 '"' 22 E · , : · ~.~ . 8780. ~.0 8700 O0 '""-"'"'~'" '-' :' · 0..~ :.: N · .',,.~,:,z:. 1044, 19 E o~oC). 2(3 o?00.00 3474.34 N 1102.44 E 'P080.20 9000.00 3520.69 N 112.9.57 E 10260 ........ 9 '18 O= 20 ........ ?. '1' 00 ;' 0'0 ............. 35~66-';'%]B '-' N 1-I-56-; 2 9 E 10330 9241.81 9161.61 3594.01 N 1172.74 E 9345 9462 .... 9'578 969'2 9805 10033 10147 871.23 886.51 ::..01.~. '931' 948. -'-:~'&,~ 9~5.72 ....... . 101~ · ' ~'~13'~ 1053.66 1067.17 1088.1~' T H E-- CA LC. UL-A T'I'O I'q-P R 0 CED U RES'-'IL .-fSE-A--L--I NE'AR'-'I'NTE RP 0 L-CiT'IKi N B E"T B E EN THE NEAREST 20 FOOT MD (FROM RADIUS OF L. LIRVA] .IRE) F'OINTS ::: ' : 16..93 17.04 16.84 13.:7'~::::'i :" ::::::::::::/::?:: :::::::::: :::::::?::::::::::::::::::::::::::::: :::::::::::: :::::i:. ,:' ::i ~. :,;'.::'. 13.90 "--' 13.96 13.51 1'3.02. 8. 001' . . · Sohio Alaska Petroleum Company Our Boss Gyroscopic Survey Job No. AK-BO-30017 Well: H-20 (SEC 21 TllN R13E) Prudhoe Bay Field North Slope, Alaska Survey D~te: February 21, 1983 Operator: Samec Scale: 1" = 1000' TRUE. NORTH 10330 I00.00 .~- Surafce Location 0480 SNL 1735 WEL -1£ oo ~1000.00 100~.00 HOR I ZONTFIL ,PR,.O.,.,J,I~CT I ON ?-~ ,:: !" ~ ". ".~,/' ~=, 7 , . Suggested form to be inserted in each "Active" well folder to ckeck for timely compliance with our regulations. Operator, Well Name and Number Reports and Materials to be received by: .3 --/~- ~.'3 Date Required Date Received , Cc~pletion Report Yes · 3- Well .History Yes 3-' ~8'~'~ _Samples ~. ,//~ Core Chips Core Descr±ption Registered Survey Plat . , , . ! Inclination Survey Directional Survey Drill Stm Test Reports Production Test Reports ,~... , Digitized Data ....... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator Sohio Ala.~ka Petroleum Company 3. Address P.O. Box 6612, Anchoraqe, Alaska 4. Location of Well At Surface: 99502 7. Permit No. 83-7 8. APl Number 50- 029-20896 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 480' SNL, 1736' WEL, Sec. 21, TllN, R13E, UPM H-20 11. Field and Pool I an'd-Serial 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designj~on KBE = 80.20' ~4SL I ADL 28~4 12. Check Appropriate Box To Indicate~' Nature of Notice, Report, or Other Data (42-16-11-13) PBU NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following interval was perforated December 22, 1985 using Schlumberger 3 3/8" Scallop guns at 6 spf. 10078'-10098' BKB (Ref. BHCS/GR, 2/10/83) The following additional intervals were perforated December 22-25, 1984 using Schlumberger 2 7/8" Hyperdon~s at 4 spf: 9944'-10032' BKB (Ref. BHCS/GR, 2/10/83) 10044'-10078~. BKB ( " ) A lubricator was. installed and tested to 3500 psi on all well work. An sSsv was set and tested in the ball valve nipple at 29 85'. R &~" C ~' i V ~ 2 5' 1985 Alaska Oil & ~,'~s Cons. COrnrnlssiori At~chorage 1~.. I hereby certify that the foregoing is true and correct to the best of my knowledge. '~'~~~~. . _ . Title District Petroleum Enqineer 'l~e space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date__ Form 10-403 Rev. 7-1-80 Submit "intentions" in Triplicate and "Subsequent Reports" in Duplicate --', STATE Or: ALASKA ALASKA , . AND GAS CONSERVATION C, 'AISSION MO#THLY REPORT OF DRILLING AND WORKOVER OPERATIONSy . · Drilling well~ Workover operation [] 2. Name of operator 7. Permit No. Sohio Alaska Petroleum Cc~pany' 83-7 Address P.O. Box 6612, Anchorage, Alaska 99502 4. Location of Well at surface 480' SNL, 1736' WEL, Sec. 21, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) ~R~. = 80.20' AMSL 6. Lease 2~4 Designation and Serial No. For the Month of J~~ , 19 85 8. APl Number so_029-20896 9. Unit or Lease Name Pru~hoe :Bay Unit 10. Well No. H-20 (42-16-11-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run RECEivED 6. DST data, perforating data, shows of H2S, miscellaneous data See Attached Alaska 0u & Gas Cons. -17. I hereby certify that the foregoing is true and correct to the best of my knowledge· I~GN E~ TITLE District Petroleum Engineer DATE NOTE--Report on this form is required for each calenda~ month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10~,04 Submit in duplicate PERFORATING DATA - Well H-20 (42-16-11-13) PBU November 25, 1984: December 22, 1984: Pressure tested tubing and inner annulus. Rigged up Schlumberger and perforated the following interval using 3 3/8" Scallop guns at 6 spf: 10078 '-10098 ' BKB (Ref. BHCS/GR, 2/10/83) December 22-24, 1984: December' 31, 1984: January 2, 1985: January 4, 1985: Rigged up Schlumberger and perforated the following additional intervals using 2-7/8" Hyperdomes at 4 spf: 9944'-10032' BKB (Ref. BHCS/GR, 2/10/83) 10044'-10078' BKB ( " ) Put well on production. Shut well in to prepare for static pressure survey. Ran static pressure/temperature survey at 8800' TVDss. Set and tested SSSV in ball valve nipple at 2985'. Well on production. SOHIO ALASKA PETROLEUM COMPANY ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ~,~ ANCHORAGE, ALASKA 99502-0612 October 30, 1984 AlaSka Oil & Gas Conservation Ccatmission 3001 Porcupine Drive Anchorage, Alaska 99501 A%tention: Mr. C. V. Chatterton Wells H-17, H-!8, H-19 and H-20 PBU Gentla~n: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our proposals ~o perforate these wells. / pjw Enclosures cc: A. E. Leske Well File ~17 Yours very truly, /,77': A. Bragg istrict Petroleum Engineer (Acting) RECEIVED o Alaska Oil & Gas Cons. Commission Anchorage f~---- STATE OF ALASKA ....... ,, ALASi- ..,'L AND GAS CONSERVATION iMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL'I-~ OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 83-7 3. Address 8. APl Number P.O. BOX 6612, Anchorage, Alaska 99502 50-029-20896 4. Location of Well At Surface: 480' SNL, 1736' WEL, Sec. 21, Tlt/~{,R13E, UPM 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number H-20 (42-16-11-13) PBU 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) / 6. Lease Designat~?,i~nd Serial.No. __ ,~,~,1 ~l_-"l.~Oe Oil Pool KBE = 80.20' AMSL ~ . ~.. u, ;~,-, ~. ~ 12. Check Appropriat Box To Indicate Nature of Notice,'~/e/pC~r~ or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~t Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other []- Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105~170). The following intervals will be perforated in November, 1984 using Schlumberger 3 3/8" Scallops at 6 s.p.f. A lubricator will be installed and tested to 3500 psi for all well work. 9944'-10032' BKB (Ref. BHCS/GR, 2/10/83) 10044'- 10098' BKB ( " ) An SSSV will be set and tested in the ball valve nipple at 2985'. RECEIVED .Nov 0 Alaska 0il & Gas Cons. Commission APchor~?. 14. ,/~~tify Con~~/s of Approval, if any: that the foregoing is true and correct to the best of my knowledge. District Petroleum Engineer Title Date Approved by By Order of COMMISSIONER the Commission Approved Cony Returned ' ' Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PET~qOLEUM COMPANY SFO ARCO TO: EXXON PHILLIPS STATE OF AK CENTRAL FILES(CC#'s-Transmittal Only 311 1 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907) 265-0000 MAIL: POUCH 6.612 ANCHORAGE, ALASKA 99502 Date: 5-23-83 Trans.#:074467 CC#: 074467 REFERENCE: SOHIO MAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- 4Y-18 %y-.12 Y-~- 02-24-83 RFT Run 1 Sch. 68080 02-24-83 Open Hole Run 1 Sch 68080 03-13-83 Open Hole Run l&2 Sch. 68165 02-10--83 TtYi~m Run 1 Sch. 68011 *G-7j'~ 03_13_83 ~'D-8 05-05-83 aq~-20 -'~'~' 02-10-83 ~F-5 ~.. 12-09-80 oa, TDT-M Run 2 Sch. 68126 TDT-M Run 3 Sch. 68245 TDT-M 3~REP~) ' RU~ 2 Sch. 65651 CH CNL Run 1 Sch. 68087 TDT-M (REp_..~) Run 2 Sch. 61247 Open Hole Run 1 Sch. 68130 TDT-M Run 1 Sch. 68127 Open Hole Run 1 Sch. 68210 Open Hole Run 1 Sch. 68161 *'SFO & EXXON: An Asterisk:(*) next to a listing abouve means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. RECEIVE ,. .-~1 ~ '; · . '.: :, Anne Jones Deve:lop, enc 0eology · . . l',::/:i ,' '~ ' ' o :'. SOl-IlO ALASKA PETFIOLEUM COF¢~PANY SFO ARCO EXXON PHILLIPS CENTRAL FILES(CC#'s-Transm~tt~l Only 311 ) "C" S1R[6I /~NCI ~OFlt~G[, ALASKA 1EL[i'HO:4[ {'307J 26.5-0000 MAIL: Ir'oucH 6-612 ANCI'IORAGE. ALASKA 99502 Da re: 3-9-83 Trans. ft: CCF/: 56201 REFE RE h,K~E: SOHIO MAGNETIC LIS TAPES & LISTINGS e following material is being submitled herewith.-Please acknowledge receipt by signing copy o( 1his ietler and relurnin9 it 1o lhis office:-- .~~.: A-20 M-19 H-20 S-12 R-il ~23 ,~, H-19 R-14 N-17 2-17-83 C2-I.~ #68051 Run #1 Sch 2-19-83 Open Hole ~ #68053 Run #1 Sch 2-10-83 Open Hote #68013 Run #1 Sch 5-19-82 Open Hole #65152 Run'#1,2 Sch Re_plac~-F~.O~.~pe 1-23-83 Open Hole #66356 Run #1 Sch 1-26-83 Open Hole #66376 Run #1 Sch 1-24-83 Open Hole #66357 Run #1 Sch 2-09-83 Open Hole #68001 Run #1 Scl] 2-04-83 Open Hole #66410 Run #1 Sch ~ ' .... ~ ~ ,"'" · ........ :':: 7'~ d 9-&g- !~ 7~3 '-: .... :'". o 7, · S~O & E~ON: AnAste~isk:(*) ~ to ~ iist~n~ abouve me~ns you Feceived the Tape(s) and ~s~n$(s) d~ectly ~[om ~he ~espect~ve se[v~ce company Please con~ th~s. RECEIVED ~e Jones Development Geo]ogy Da~E ~9 Uell Records '~,/82) SOHIO ALASKA PETROLEUM COMPANY SFO ~ ARCO .o CHEVRON EXXON . XED 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: GETTY SYO/UN~T/ STATE: M~ARATH ON MOBIL PHILLIPS BPAE (Transmittal Ont¥) REFERENC{~FNTRAL FILES (CCI/' s-Transmittal Only) 3/7/83 Date: Trans.#: - CC#: 56187 * Date to State Via Drilling: 3/7/83 SOHIO OPEN HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: H-20 H-20 H-20 H-20 DIL/SFL/GR BHCS/O~ FDC/CNL/GR-Poro FDC/CNL/GR-Raw 2/11/83 #1 2/10/83 #1 2/11/83 #1 2/11/83 #1 9444-10311 Sch 5" & 2" 9444-10276 Sch 5" & 2" 9444-10287 Sch 5" & 2" 9444-10287 Sch 5" & 2" STATE ONLY: DIRECTIONAL SURVEYS: Magnetic Single Shot Directional Survey Gyroscopic Directional Survey RECEIVED DA T E .19 Date: 1 Date:2/21/83 Job#: AL183D2 Job#: AK-BO-30017 q-z) )._. (.'"' SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 March 8, 1983 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WELL H-20 (42-16-11-13) PBU Enclosed, in duplicate, is Form 10-407, Well Completion Report, for the above-named well together with the Well History, Well Logs and Directional Surveys. This well has been completed as a non-perforated oil well. Very truly yours, R. H. Reiley District Drilling Engineer RHR:MCM:pw encs cc: Well File ~17 Geology t~laska Oil & Gas Cons. OommissJori Anchorage WELL H-20 (42r16-11-13) PBU WELL HISTORY Spudded well at 1700 hours, January 3, 1983. Drilled 17 1/2" hole to 2715'. Ran 70 jts. 13 3/8" 72~ L-80 Buttress casing to 2692'. Cemented with 3720 cu. ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to 2648'; tested casing to 3000 psi, okay. Drilled out to 2723'; ran leak-off test to 0.59 psi/ft. gradient. Directionally drilled 12 1/4" hole to 9473'. Ran 232 jts. 9 5/8" 47~ L-80 Buttress casing to 9457'. Cemented in two stages: First stage with 1322 cu. ft. Class G cement; second stage through D.V. packer at 2640' with 130 cu. ft. Permafrost C cement preceded by Arctic Pack. Cleaned out D.V.; tested casing to 3000 psi, okay. Cleaned out float equipment and directionally drilled 8 1/2" hole to 10330'. Ran open hole logs. Ran 28 jts. 7" 26# L-80 IJ4S liner to 10328'. Cemented with 302 cu. ft. Class G cement with 18% salt. Cleaned out to 10287'; tested liner to 3000 psi, okay. Changed well over to NaC1.. Ran CBL. Ran 225 jts. 7" 26# L-80 IJ4S/5 1/2" 17# A/B Mod Buttress IPC tubing with 4 1/2" tailpipe assembly to 9282'. Landed tubing with ball valve at 2985'. Installed and tested tree. Displaced tubing to diesel; set packer at 9138'. Tested tubing to 3500 psi, okay. Released rig at 2400 hours, February 14, 1983. Ran gyroscopic survey, tested and secured well February 21, 1983. MEMORA, IDUM Sta e of )IL GAS CONSERVATION COMMISSION ~J~-ASK/~ .~. 327D T O:c. Cha Thru: Lonnie C. Smith C~missioner FROM: Bobby Foster Petroleum_ Inspector Alaska DATE: February 4, 1983 FILE NO: 10 8/P TELEPHONE NO: SUBJECT: Witness BOPE Test on Sohio's H-20 Sec. 21, TlJ}~, R13E, U~-~ Permit # 83-7 Wednesday, F~urary _2_,. 1983 - The BOPE test began at 4:00 p.m. and_ was conclude8 at 5:30 p.m. As the attached BOPE test report shows there -were no failures. In summary, I witnesse~ the BOPE test on Sohio's R-20. O&G #4 ., STATE OF ALASKA ALASKA OIL & ~AS GONSERVATION CCFJvJSSION B .O.P.E. Inspection Report. Inspector Operator Well ~ i 11 i nq ~tion, Well-Sign ceneral o ekeeping Reserve pit BOPE Stack Annular Preventer Test Pressure / Representative~_~~ ~/~z64~ ._ Permit # _~ ~- ~ / /~Casing Set @ ~ & ~ ft. ~ Repre~ntat iv~ ~[; ~~~7 AC~U~R SYS~M ~i' ~rge ~es~e~ / ~ ~ psig ~es~re ~ter Clo~re /~~ psig ~ ~cr. clos. pres. 200 psig. -- ~~sec. ~11 Ch~e ~es~re At~~: ~~n~sec. Cont~ls: ~ster ~ R~te~ ~.J Blinds ~it~ cover ~ ~ Kelly ~d Flor Safe~ V~ves - ~r Kelly / Test ~essure ~0 ~ Pipe Rams Blind Rams Choke Line Valves-- Lower Kelly. Ball Inside BOP / Test Pressure__ / Test Pressure Test Pres sure H.C.R. Valve Kill Line Valves- / Check Valve Test Results: Failures Choke Manifold ~ ~ Test Pressure~.~'~ Va es. 11 NO. flanges 2 ~ Adjustable Chokes Hydrauically operated choke / Test Time.' / ~/~--. hrs. Repair or Replacement of failed equipment to be made within~ ---- Inspector/C~nmission office notified. days and Remarks: Distribution orig. - AC&GCC cc - Operator cc - Supervisor January 11, t983 .~. R..~,., ~' Rei!eY District~_~rr~ i!ting Engineer Sohio Alaska Petroleu~ Company Pouch 6-612 h ~aska 99502 Anc_~orage, ~.~ Prudhoe Bay Unit- Sohio Alaska Petroleum Company Permgt No. 83-7 o_ T11N R13 E UPM Sur. Loc. 480'S;:P~, 1736'WEL, ,~ec. 21, . , , · Ti 1N ~ 13E UPM Btm_hole Loc. 2005'SNL,~ 531'~-:=~-~-.-., Sec. 16, , ~.. , . Dear wv Reilev: Enclosed is the approved application for permit to drill the above referenced well. I~ coring is conducted, a one cubic inch ch~ ~ lp from each foot of recovered core is required ,_.a,~,p!e~ of well cuttings and a r~d log are not required, A continuous directional survey is required as per 20 A~C 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted om all logs for copying except experimental logs, velocity surveys and dipmeter surveys. !~any rivers in Alaska a~,~ their drainage systems have been Classified as important for the spawning or migration of anadrO~ous .~..~n Operations i~ these areas are subject to _ ~ 16 05 870=n,_~ ~ ~ th~ ra~_ulations promulgated thereunder (Ti+ = Admini Code Prior to co~mencinf ~!~ 5, Alaska . ~ . strative ). Operations you may be contacted by the Habitat Coordinator~s o~ce, Department of Fish and Gm~e Pollution of any waters of the State is prohibited by AS 46, Ch=~t~r a Article 7 and the regulations pro'~ulEated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal i~ater Pollution Control Act, as amended. Prior to co~encing operations you ~av be contacted by a representative of the Departn~ent of Environ~:antal Conservatiop. To a~d us in ~cm. euuiing field work, please notify this office 24 hours prior to com.~ncing installation of th.e blowout Mr. R. I{. Reiley Prudhoe Bay Unit H-20 -2- January 11, 1983 prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. %~here a dlverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, / ,:"/...I-; ,- . ~. V. ~hatterton Chalr~n of SY O~DSR O~ l~-~: CO~::~&$~ON Alaska Oil and Gas ~onservation Co~tssion Enc lo sure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. CVC: be SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99,502 January 10, 1983 Alaska Oil & Gas Conservation Cc~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: WRLL 'H'20 ~ (42'16~11=13) ~PBU Enclosed are the following documents, in triplicate, along with our check for $100 to cover the' permit filing fee. 1. Application for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram; 4. Surveyor' s plat showing well location; 5. Directional map. If you have any questions, please call Ted Stagg at 263-5173. encs cc: Very truly yours, R. H. Reiley District Drilling Engineer Well File #17 0il & Gas Cons, Anchorage STATE OF ALASKA ~ ALASKA 0,._ AND GAS CONSERVATION COl',. ,IISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL;~[] DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE [~; MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Conloany 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 480' SNL, 1736' WEL, Sec. 21, TllN, R13E, UPM At top of proposed producing interval (target) 2225' SNL, 600' WEL, Sec. 16, TllN, R13E, UPM At total depth 2005' SNL, 531' WEL, Sec. 16, TI]N, R13E, UPM 9. Unit or lease name Prudhoe Bay Unit 10. Well number H-20 (42-16-11-13) PBU 11. Field and pool Prudhoe Oil Pool 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. ~L,~,~ 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Safeco Ins. 2975387 Amount $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed NW of Deadhorse - 10 miles SOllth of ADL 28281 - 2225feet well H-8 - 1600 f~t 16. Proposed depth (MD & TVD) 10399' ND - 9211' ~ feet 19. If deviated (see 20 AAC 25.050) 17. Number of acres in lease 2560 18. Approximate spud date February 15, 1983 3330 psig@ Surface KICK OFF POINT 2800 feet. 21 20. Anticipated pressures MAXIMUM HOLE ANGLE 35 o I (see 20 AAC 25.035 (c) (2) Proposed Casing, Liner and Cementing Program 4390 psig@ 8800 .ft. ~ (TVD) SIZE Insular CASING AND LINER Grade Coupling :ed CondUctor L-80 Butt. L-80 Butt. L-80 IJ4S H3o~e { Casing Weight 20x30 17 1/~ 13 3/8 72# ..._1.2 1/4[ 9 5/8 47# 8 1/21 7 26~ 22. Describe proposed program: SETTING DEPTH QUANTITY OF CEMENT Length MD TOP TVD MD BOTTOM TVD (include stage data) 80 SurfaCe 110 110 8 cu.¥ds concrete 2700 2700 Surfa%e Surface 2700 9448 9448 8429 I 3750 cu.ft. Permafrost 1272 cu.ft. Class G; 130 cu.ft. Permafros I 1201 9198 ~ 8224 10399 9211 330 cu. ft. Class G w ' 18 See attached proposed drilling and completion program. As shown on the attached directional plat, we are aware of the potential intersection problems which can result from the drilling of this well. If during actual drilling operations, one of these intersections is approached within hazardous proximity, the well to be intersected wiii be shut-in. 23. I hereby certif~e foregoing is true and correct to the best of my knowledge District Drilling Engineer The space below for Commission use R. H. Reiley / CONDITIONS OF APPROVAL A~':,~;imra9 DATE Samples required Mud log required ~]YES I¢INO r-]YES I~.NO Permit number ~ Approval date Directional Survey required [ APl number [~[YES i'~UO 50-- 0 ~ ~ ~7--~ ¢~¢ (~ SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMM ISSI ON ER DATE by order of the Commission January 11, 1983 9, lhmit in trinlirnt. II -C ~sal WM~,L H-20 (42-16-11-13) PBU PROPOSED DRILLING AND COMPLETION PROGRAM Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu. yds. concrete. Drill 17 1/2" hole to 2700' and cement 13 3/8" 72# L-80 Buttress casing to surface using 3750 cu. ft. Permafrost II cement. Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams and annular preventer from 13 3/8" casing point to T.D. Max~ possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8431' TVD. Run 9 5/8" 47# L-80 Buttress casing to 8429 ' TVD and cement first stage with 1272 cu. ft. Class G cement. Cement second stage through D.V. packer collar at 2600' with 130 cu.. ft. Permafrost C cement. The 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D. at 9211 , TVD. Cement 7" liner to 250' inside 9 5/8" casing shoe with 330 cu. ft. Class G cemant with 18% salt. Run 7"26# IJ4S/5 1/2"17# AB Mod Butt IPC tubing with 13 gas lift mandrels and a production packer assembly at 8183 ' TVD. A subsurface safety valve with dual control lines will be placed at 300___q0 '. Displace tubing to diesel. ? Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. B.O.P. ~'=;TACK CONFIGURatION I$ 5Z8" TRIPLE RAM STACK 5000 PSI WP DRILLING ',I ANNULAR PREVENTER PIPE RAMS BLIND RAMS 2" KILL LINE CHECK (SATE GATE DRILLING SPOOL PIPE RAMS CHOKE LINE HAND GATE HYDR. ASST. GATE ~,., J/iN '--',m 02,5 · 30 04 '1 I0 20 02 16 LAT. 70° 17'55.35" LO~G~ i48~50' 3~). 43" X= 64Z,843 Y'- 5,959,969 40 600' :~_ . H- 20 (Proposed) I0 20 30 40 2510' H-I~ (Proposed) 325' H -19 (Proposed) H-I? (Proposed) , 2375 I I /6- I/- /$) '~2-15- II- I$) '14 - 15- II - 1.5) ~34-15-11- I$) PAD DETAIL SCALE I"= 300' 2-7 r~PORTION T. II N.,R. 1:5 E. SCALE I"= I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that I om properly registered to practice land surveying in the State of Alaska ondthot this plot represents olocotion survey of the wellpod shown and the wells thereon. This survey was mode by me or under my supervision and olldimensions ondotherdetoils ore correct. Bottom hole locations ore furnished by others. /%/o v. ..5., / 9e~2 Dale ADD PROPOSED BHL H-19 8~ H-20 ~URVEYOR ~ ~,.12 /9/82 PLAT 3 OF 3 PAD "H" EXTENSION Located In NE I/4 PROTRACTED SEC. 21 UMIAT MER. Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by F.M. LINDSEY I~ ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2502 West Norfhern Llghts Boulevard Box 4-081 Anchorage Alaska A -12731 -82 !{~oo l~oo 0 ~oo 4~3o ~o 8oo IOoo A:-..,?,horacj~ U,0ULD YOU LZKF._ R FULL REPORT GEHT TO THE PRIHTF..R ? HO U~c.j~IO~ S,~ COLliE LZf'~I~ CALCULRT{ON F'O~ UELL F~ pROPOSED UELL BOTTOJ~ a4397e. 3! 5964075,44 9~3~.45 NOTE - ~LL DF_PTF~ IH FEET ]~ELOI~ KELI.¥ CLOGE~T /I:q~OPO~ED~ /t'~l~d~BY~ CLOg£ST ~ ~D~ TUD ~P~T TUD ~ DZST~E Ai06~ 3s~-s 1~.2 ~4.7 4~.4 ~38~ ~03.5 8.8 ~.8 6.~ ~ 3.6 9.~ 8.~ 6.8 478,? 87~,3 ~.t ~,5 t549.6 ~-~ ~4~ ~344~ ~1.6 ~,6 4847,7 i~,3 4B~,9 7167.1 ~.4 4~l,G ~I~,1 4648,4 193.5 e.e 1~.0 .4 14~,7 ETe4.1 e.e ~.9 7.2 ~33,3 3Ge,~ 441G,8 G74.S t1~,~ 3168,3 ~.3 ~.i 6tl, UERTICAL IHTERSECTIOH TUD D£PART TYD DEP~RT DIGT~iC£ YOU LIKE f~ FULL REPORT SENT TO THE PRIHTER 9 FOR PROPOSF..D UELL ~(42 I~I~TE - J~L,L DE~PTI. f~* IN FEET ~ELOU KELLY --- CLOSEST RPPROP~H RHRL¥S[5 --- 40~4.3 338.~ g'~t~,4 3943.! ~.O ~,4 g~,9 1~4.3 i386,9 9486,4 to3.5 ~4~ ~?~,t e.o ~.g 7.~ 1571.9 e,e e.o 3t~,6 ag,? 3B~, 5iO,B 866.7 UERTICflL IHTERSECTION /PROPOSED% /HEAR9¥\ UERTICAL TOD DEPRRT TUD DEP~RT DIST~h'C~ 6508.8 ~O?i.? 847t.6 aea4.$ i966.8 3b"??.J 174.5 4894.3 33R.8 897.4 $.0 8-O t.t .e 1E~4.4 3o4s.g 387.8 4337.8 GG?.i iiGt.B ~.O 174.5 4~,9 347,0 9BB.t 3BY?.e 174.5 ~4.5 337.5 897.4 THE I~-LI. UHZCH CORES CLOT TO THE P~OPOSED HO PRIttl'E~ I~OUIJ) YOU LIY~ S1 PRIh*TOUT OF THE RftRKE. R I)EPTH5, ¥ ? CHECK LIST FOR NEW WELL PERMITS ~ Company ......... ~'0 ~' Lease & Well No. ITEM APPROVE DATE (1) Fee ?.~ ~' ~p,.,, :v .... ~2 thru 8) (3) Admin ~.. ~ ~.~ ,, (9/thru 11) (12 thru 20) me 3. Is well located proper distance from property line ...... ............ 4. Is well located proper distance from other wells ...~ ................ 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ................................. 8. Can permit be approved before ten,day wait .......................... . 10. 11. YES NO 12. 13. 14. 15. 16. 17. 18. 19. 20. permit fee attached ...,~ ........................... ........ .... Is the ted de~ .... / Is well to be loca in a ined pool ............................. Does operator have a bond in force .................................. ?~. Is a conservation order needed ...................................... Is administrative approval needed .................................... Is conductor string provided .............. ........... ............. Is enough cement used to circulate on conductor and surface ..... Will cement tie in surface and intermediate or production strings Will cement cover all known productive horizons ............ ' ..... Will surface casing protect fresh water zones ....... ~ ....... Will all casing give adequate safety in collapse, tension and Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 .... Is adequate well bore separation proposed ................... burst.. ~7~ _ .ee®e.ee · .lee.lc ~ REMARKS (5) BOPE #~'/~ ,,/,-I~_-~ (21 thru 24) 21. 22. 23. 24. 25. Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached Does BOPE have sufficient pressure rating- Test to pi /AP1 ( 78) Does the choke manifold corn y w RP-53 Feb ................... Additional requirements ............................................. Additional Remarks: Geology: Engin~e e.r-in g: rev: 12/0~/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well Histo.ry File APPENDIX Information of detailed nature that is not padiculady germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. . . No special 'effort has been made to chronologically organize this category of information. ,o PROGRAM: LISCAN RE¥~!SION: 5.1 PART NUMBER: W5790-PE32 S~m~ o~ e~e:~i:!~:-o,r~: Wed 29 NOV- 89 3: 4:513 **** REEL HEADER **** LIS 89/19/11 ATLAS 01 ~ ":LIS CUSTOMER FORMAT TAPE:": **** TAPE HEADER **** LIS 89/1 9/I 1 4069 01 PA'SS CN/MS 10260-9380 FT.::~;~ FILE # I **** FILE HEADER **** PASS: 1.001 1024 CN :~N COUN STAT : B.P. EX~PLORATION : PR. UDHOE B : :H-20 (42-16-11-13) : NORTH SLOPE : AL, ASKA * FORMAT RECORD (:TYPE#: 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CUR:VES : NAME CODE SAMPLE# :UNIT I GR 68 I API 2 TTEN 68 1~ LB 3 TEN 68 1 LB 4 SPO 68 1 F/MM 5 CCL 68 I VOLT 6 SSN 68 -1 CTS BYTES 4 4 4 4 4 4 c) CLSN 68 1 1 0 CN 68 1 11 CNC 68 1 1 2 CNRA 68 I CTS 4 PCT 4 PCT 4 C/C 4 * DATA RECORD DEPTH C CL: CN 10260.000 0.1000000E-03 -0.1000000E-03 10210.000 0.0000000 19. 298.05 10160.000 0.0000000 26,82292 10110.000 3,900001 26,61911 10060.000 1,300000 2:2,55151 10010,000 1 ,300000 29,10942 9960.000 0.0000000 24.10254 9910.000 0,0000000 13,89473 9860.000 1,950001 1:9,06856 9810. O00 0.0000000 24.68427 9760,000 0,-00OO000 22,91-382 9710.000 7.800004 .23,92572 9660,000 n nnnnnnN (,TYPE# 0) GR S:SN CN!C 0.1000000E-03 0,1000000E-03 0.1000000E-03 24.41692 241.1186 21,00716 30,12933 204,6459 28,10231 25.04839 189,4676 27.90840 27,62163 264.9617 24,05859 29,67964 230.3049 30.28445 271,64243 270,5391 25,52200 23.17290 359,8384 15.99399 16,74489 323,0259 20,79285 1:7,79778 272.6763 26,07233 24.25301 274.9395 24.39993 20.66681 261.4575 25,35489 22,10135 ~45.298~ 994 BYTES * TTEN CSSN CNRA 0.1000000E-03 0,1000000E-03 0,1000000E-03 1151.656 241.1186 0. 9887820E-01 1114.145 204.6459 0.7981 247E-01 1120,236 1 89,4676 O, 8022177E-0t 1166,368 264,961~7 0.8953774E-01 1124.526 230.3049 0,7554674E-01 1141.812 270.5391 0,8571172E-01 1126,306 359.8384 0,1197968 11 20.969 323.0259 0. 9961420E-01 11 33.852 272,6763 0.8436751E-01 111!:4,833 274.9395 0.8861113E-01 1143,834 261,4575 0.8612972E-01 1139.330 345,2988 TEN LSN 0.1000000E-03 0, 1000000E-03 166.6605 95.36549 10.86319 65.33319 I .895270 60.79771 5.246613 94.89626 -32.24521 69,59515 -10.72807 92.75342 -20.73146 172.4298 -25.64561 128.7118 -12.05421 92.02010 -27.55310 97,45074 -3.275395 90.07707 -3.694465 158.1298 SPD CLSN 0.1000000E-03 0,1000000E-03 24,99750 23.84137 24.99750 16.33330 24.99750 15.19943 24.99750 23.72408 25.10670 17.39879 24.99750 23.18837 24.99750 43,10747 24.99750 32.17796 24.99750 23.00502 25.99741 24.36269 25,99741 22.51926 25.99741 39.53244 9610. 000 210.6725 1123. 242 0. 0000000 333.1 689 333. 1689 17.60059 19. 42491 0. 1046008 9560.000 82.13998 9.750006 242.04-27 30.45795 31 · 57715 9510.000 49.19078 0.0000000 229.57t7 22.18173 2,3.71051' 9460.000 83.93658 0. 0000000 153. 5616 50. 5401 0 51 . 33080 1102.364 242.0427 0. 7329071E-01 1144.127 229.5717 0.9050518E-01 ~1144.948 153.5616 0. 5412883E-01 9410.000 56.50667 1148.987 0.0000000 156.6647 156.6647 66.72054 67.93204 0.4776561E-01 -24.18741 139.3990 -28.88625 70.95792 4.835168 83.10971 -14.48659 33.24844 -14.49665 29.93274 25.88820 34.84975 25.99741 17.73949 25.88820 20.77744 25.99741 8.312109 25.76160 7.483183 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 93 10260.00 E ND i'NG TAPE DEPTH = 9380.00 FILE # 2 **** FIL~E PASS 2.002 HEADER 1024 FORMAT RECORD (T;¥PE# 64) ONE DEPTH PER .FRAME TAPE DEPTH UNIT : FT 12 CURVES : NAME CODE SAMPLE# UNIT BYTES I GR 68 :1 API 4 2 TTEN 68 I LB 4 3 TEN 68 I LB 4 4 S PO 68 I F /MM 4 5 CCL 68 I VOLT 4 6 SSN 68 1 CTS 4 7 CSSN 68 1 CTS 4 8 LSN 68 I CTS 4 9 CLSN 68 I CTS 4 :10 CN. 68 I PCT 4 11~ CNC 68~ I PCT 4 I 2 CNRA 68 I C/C 4 * DATA RECORD {TYPE# O) 994 BYTES * CNC CNRA 10260.000 O. 1000000E-03 O. 1000000E-03 10210.000 5.850004 .15,76627 O. 1000000E-03 O. O. 1000000E-03 O. O. 1000000E-03 O. 19.59106 1 250,1499 2 20, 51 074 O, 1.000000 1000000 1000000 192.456 50,1499 1006009 F-03 E-03 E -03 0.1000000E-03 0.1000000E-03 150.9521 100,6613 0.1000000E-03 0.1000000E-03 20.99791 25.16531 10160.000 0.0000000 26,81400 25.48441 1 207,4132 2 28,09383 O, 163,781 07,41:32 7983029 E-01 -3.366896 66.23145 20.99791 16,55786 101t0.000 5.850004 27,92891 28,30244 1 190.0000 1 29,15630 O. 163.051 90,0000 7767636 E-01 -7.902247 59.03403 21 .55591 14.75851 10060,000 5.850004 24,04991 29,96021 1 266,3188 2 25,47226 O. 176.207 66,3188 8583564 E-01 -7.789701 91,43860 21 ,03360 22.85965 10010.000 5.850004 30.19162 24,51086 1 228,5169 2 31,32152 O. 157.759 28.5169 7372200 E-01 -17,97243 67,38690 21.39819 16.84673 9960,000 1t.70001 25.10408 23,43289 1 274.15'72 2 26.46997 O. 157.541 74,1572 8342654 E-01 -25,47116 91 .48795 20.99791 22.87199 9910,000 0.0000000 13.21~014 25.09390 1 358.3193 3 15.36371 O. 155.738 58,3193 1231152 -20.63051 176.4582 20,99791 44,11458 9860,000 0,0000000 18.62061 19.56593 1 319,2473 3 20.37488 O, 149.201 19.2473 1010837 -27.24536 129.0827 20.99791 32.27069 9810.000 0,0000000 25,18333 19,11903 1 271.7605 2 26.54507 O, 1 47.74-7 71.7605 8325154 E -01 -14.36032 90.49789 21 .55591 22,62448 9760.000 5.850004 22.82170 26,15950 278.182t 24,31311 1152,622 278,1821 0.8884472E-01 -19.80853 98.86000 27.99721 24.71501 9710,000 5,850004 24.12578 22.10489 263,8652 25,54398 1174,422 263,8652 0,8565706 E-01 8.324980 90,40767 27.99721 22.60191 9660,000 5.850004 14.76036 22.00186 344.2017 16.79253 1174,037 344.2017 0,1158557 -0.8604046 159.5108 27.99721 39.87772 9610.000 0,0000000 17.66232 188.0379 327,5012 19,48233 1170.312 327,5012 0,1043809 -16.25681 136.7395 27.99721 34.18488 9550,000 5.850004 36.15404 83,31319 240,0658 37,08434 1204.438 240,0658 0.6552517E-01 -1.971520 62.92145 27.99721 1 5. 73036 9510.000 5.850004 51.47755 231.5352 1219,946 231.535Z 7.621036 80.30443 27.99721 20.07611 9460.000 5.$50004 56.95282 9410.000 0.0000000 72.54619 $1 ~ 76894 155 .4444 57. 8371 I 60.85965 I 5.7.1 747 74.05896 1204.306 155.4444 0.51~121 29E-01 1223.649 157.1747 0.4622360E-01 -16.26474 31.78607 -3.028041 29.06070 27.99721 7,946518 28.39751 7.265178 TOTAL O~TA ~ECOR'DS : 93 STARTING TAPE DEPTH = 10260.00 ~ILE TRAILER **** ENDING TAPE DEPTH = 9380.00 FILE # 3 **** FILE HEADER **** PASS 3.003 1024 FORMAT RECORD (TYPE# 64~ ONE DEPTH ~PER FRAME TAPE DEPTH UNLIT : FT 12 C U'R~=E S : NAME CODE SAMPLE# UNIT I GR 68 I API 2 TTEN 68 t LB 3 TEN 68 I L8 4 SPD 68 I F/MM 5 CCL 68 I VOLT 6 SSN ' 68 I ~ CT;S 7 CSSN 68 I CTS 8 LSN 68 I CTS 9 C L S N 68 I CT S 10 CN 68 I PC-T 11: CNC 68 I PCT I 2 CNRA 68 I C/C BYTES 4 4 4 4 4 4 4 4 4 4 4 4 DATA RECORD (TYPE#' 0;) D E P TH: G R CCL SSN CN CNC 10260.000 0. 1000000E-03 0,1 000000E-03 10210.000 5.850004 22.92090 0.1!000000E-03 0.1¢000000E-03 0.1:000000E-03 22.48256 221.1133 24.40660 994 BYTES * TTEN C'SSN CNRA 0.1000000E-03 0,1000000E-03 0.t000000E-03 131~3. 500 221.1133 O. 8859324E-01 TEN LSN 0,1000000E-03 0.1000000E-03 240.9903 78.35655 SPD CLSN 0.1000000E-03 0.1000000E-03 23.99760 19.58914 27-44089 ~.~87 0.7860160E-01 10110.000 0.0000000 26.61020 10060.000 5.850004 21.78735 10010.000 0.0000000 30.07513 9960.000 0.0000000 26.21938 9910.000 0.0000000 ~13.43431 9860.000 5.85O004 18.14160 9810.000 0.0000000 24.62071 9760.000 5.850004 23.62134 9710.000 0.0000000 24.66840 9660.000 5.850004 14.52756 9610.000 0.0000000 20.3'5530 9560.000 0.0000000 41,0574.6 9510.000 0.0000000 23.59232 9460.000 0.0000000 52.62321 9411 0 · 000 0.0000000 64.48639 25.78285 192.0373 27.89992 28.79465 263.4478 23.33966 26.88455 228.5244 31.20976 28.22934 272 · 311 5 27. 52835 25.63052 36.7,4377 15.56997 20.15337 317.7124 19.92847 20.97905 271.0288 26.01218 23. 42978 272.7832 25.06738 22.26259 263.4285 26.05730 22.08936 342.9663 16.57759 272.2930 312.4888 21. 99603 92.62674 217.2922 41.88585 52.15016 222.9619 25.03998 76.23572 155.55tl 53.43378 59.38582 i 57.6223 65.60338 1360.600 192.0373 0.8023977E-01 1328.126 263.4478 O. 91:56179E-01 1326.260 228.5244 0.7391286E-01 1331.413 272.3115 0.8103925 E-01 1331.745 367.4377 0.1220078 I 309.595 317.7124 0.1027048 1312.348 271.0288 0.8451211 E-01 1311.277 272.7832 0.8686000E-01 1339.135 263.4285 O. 8440363E-01 1309.131 342.9663 O. 11.68891 1285.179 312.4888 0.9562719 E-01 1290.137 217.2922 0.6062198 E-01 1284.718 222.9619 0.8693033 E-01 1260.685 155.5511 0.5305964 E-01 1264.051 157.6223 0.4843550 E-01 21.02762 61.63612 -11.59061 96.48697 -21.83771 67.56352 -17.02968 88.27165 -23.15897 179.3210 -17.48991 130.5223 -7.012559 91.62080 -11.07455 94.77583 -2.852971 88.93723 -19.02255 160.3561 -38.31229 119.5297 -31.29149 52.69075 -19.12289 77.52867 -28.56876 33.01393 -21.78554 30.53807 24.88831 15.40903 24.99750 24.12175 24.99750 16.89088 24.99750 22.06792 24.99750 44.83026 24.88831 32.63060 24.99750 22.90521 24.99750 23.69395 24.99750 22.23431 24.99750 40.08902 24.99750 29.88243 24.99750 13.17268 24.99750 19.38216 24.99750 8.253485 24.99750 7.634517 **** F E T **** FILE # 4 P~SS 4.004 **** FILE HEADER **** 1024 FORMAT ONE OEP T, APE DE RECORD (T-¥PE# 641) TH-PER FRAME PTH ~NIT : FT 1 2 CURVES : N A:M E 1' GR 2 TTEN 3 TEN 4 SPD 5 CCL 6 S SN 7 CSSN 8 LSN 9 CLSN 10 CN 1 ~ CNC 1 2 CN. RA CODE 68 68 68 68 68 68 68 68 6.8 68 68 68 S A~M PLE# UNIT 1~ AP I I LB I LB I · F/::MM I VOLT I CTS I C?S I CTS I ~ CTS I PCT I PCT 1- C/C BYTES 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH CCL CN 10260.000 O, 1000000E-03. 0, 1000000E-03 10210.000 5,850004 19,12215 10160,000 0,0000000 29,36272 t0110,000 0,00OO000 25,78783 10060,000 0.0000000 22.g!61t (TYPE# GR SSN CNC 0,1000000E-03 0,1000000E-O3 0,1000000E-03 18,77266 252,7263 20,84286 25,92055 206,4495 30,52693 30,99681 1'96,9577 27,11848 33,00948 268,9431 24,40208 994 BYTES * TTEN CSSN CNRA 0,1000000E-03 0,1000000E-03 0,1000000E-03 1'284,211 252,7263 0,9944135E-01 I 277,853 206,4495 0,7510906E-01 1287,239 196,9577 0,81:94405E-01 1297,030 268,9431 0,8860528E-01 TEN LSN 0.1000000E-03 0,1000000E-03 195,1100 100.5258 32,84453 62,02493 6,289407 64.55803 -5,693130 95,31918 SPD CLSN 0.1000000E-03 0,1000000E-03 26,99730 25,13144 25.00340 1'5,50624 24.99750 16,t3951 24,99750 23.82979 28.54697 29.74654 0.7654274E-01 9960. 000 28. 27095 I 285. 437 5.850004 271 . 6633 271. 6633 24. 62532 26.01 654 O. 8450156E-01 9910. 000 23. 24358 I 267. 880 O. 0000000 369. 5203 369. 5203 13. 02095 I 5. 18974 O. 1 240662 9860. 000 19. 99908 1319. 230 0.0000000 31 6.1 379 31 6.1 379 18. 26448 20.04.294 0. 1022838 9510.000 18.83826 23.40002 272.8071 25.30432 26.659'77 9760.000 24.49663 5.850004 274.1736 25.92302 27.24683 9710.000 281.84514 23.40002 266.1416 22.86830 24.35703 1327.841 272.8071 O. 8298600E-01 1307.284 274.1736 0.8165801E-01 1303.485 266.1416 O. 8872640E-01 9660.000 26.21~344 1285.267 0.0000000 338.0872 338.0872 13.74561 15.85660 0.1205037 9610. 000 257. 6040 I 280. 021 5.850004 315.8284 31 5. 8284 19. 50786 21. 20319 0.9821 504E-01 9560.000 92.92680 1266.302 5.850004 220.6604 220.6604 42..25630 43.0683t 0.5961452E-01 9510. 000 52. 200?9 I 259. 895 O. 00000'00 220. 867~9 220.8679 21 . $2083 23. 37112 O. 91471 08E-01 9460.000 77.31726 1253.552 0.0000000 155.8045 155.80~5 61.27351 6.2.27504 0.4949187E-01 9410.000 60.47710 I 244. 474 O. 0000000 I 59. 2542 159.2542 58. t1633 59.02791 0.5065586E-01 -18.29512 91.82391 -25.61177 183.3798 5.787682 I 29. 3431 -1.331020 90.55673 -15.63827 89.55391 -14.34568 94.45512 -27.33836 162.9631 -36.93430 124.0764 -36.70737 52.61826 -23.38069 80.81209 -23.81013 30.84424 -22.72983 32.26865 24.99750 22.95598 24.99750 45.84496 24.99750' 32.33578 24.99750 22.63918 24.99750 22.38847 24.99750 23.61378 24.99750 40.74077 24.99750 31.01910 24.99750 13.15456 24.99750 20.20302 24.99750 7.711058 24.99750 8.067158 TOTAL D~TA RECORDS : STARTING TAPE DEPTH = FI.LE TRAILER **** 93 10260.00 ENDING TAPE DEPTH 9380.00 **** TAPE LI, S 89/1961 I 4069 01 TRAILER **** TOTAL RECORDS IN THIS LOGICAL TAPE : 388 **** REEL TRAILER **** LIS 89/19/11 ATLAS 0t TOTAL RECORDS IN THIS LOGICAL REEL~ : 389 TOTAL RECORDS tN THIS PH¥'SICAL REEL': 389 En'd. o.f" e~)~e:c~-:~ion: '~e~ d 29 NOV-89 3:4.6P EIa~s'e~ e~etCu~'~ion ~:ime = 1, m~a:~® , 52.0 seconds. SYSTEM RETURN CODE = 0 .. ,]Ut 0 6 199~ I Run 1- 23 - April - 1993 PDK-1001GR Borax Log t559 0222 I Tape Subfile 2 is type: L£S TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD H - 20 500292089600 B.P. EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 15-JUN-93 4069.01 R. IORIO J. WELCH 21 liN 13E 480 1735 80.20 79.20 45.05 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 9457.0 47.00 7.000 10328.0 26.00 5.500 9138.0 17.00 4.500 9281.0 12.60 EQUIVALENT UNSHIFTED DEPTH -- BASELINE DEPTH 9543.0 9564.5 9599.5 9607.0 9619.0 9631.5. 9710.5 9718.0 9763.0 9825.5 9893.5 9894.5 9895.5 UNKNOWN GR PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: GRCH 9543.0 9565.0 9600.0 9607.0 9618.5 9631.0 9709.0 9716.5 9762.0 9824.5 9893.0 9894.0 9894.5 10107.0 10108.0 10163.0 10164.0 10166.5 10172.5 10177.5 10178.0 10226.0 $ REMARKS: 101o7.5 10108.0 10163.0 10163.5 10166.0 10172.5 10177.5 10178.0 10226.0 PDK- 100 / GR Borax Log. LOG TIED TO CBL RUN 13-FEB-83. WELL RATE (4/14/93): BOPD = 3210 GOR = 9883 30 CHOKE. PDK LOGGING PROGRAM ORGANIZATION: 1) MADE PDK FLOWING PASS. 2) MADE 2 BASE SHUT-IN PASSES WITH SEAWATER PUMP-IN. 3) MADE BORAX PASS 1 WITH 25 BBLS BORAX AWAY. 4) MADE BORAX PASS 2 WITH 60 BBLS BORAX AWAY. 5) MADE FLUSH PASS. OPEN HOLE GAMMA RAY FOR DEPTH MATCHING SUPPLIED BY BP EXPLORATION (ALASKA) INC (08-JUN-93). SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS SGMA. $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 9559.0 10207.0 PDK 9588.0 10219.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH SGMA EQUIVALENT UNSHIFTED DEPTH 9543.0 9543.0 9636.0 9635.5 9640.5 9640.0 9657.5 9656.5 9714.0 9713.0 9768.5 9767.5 9783.0 9782.0 9797.5 9797.0 9819.5 9818.5 9828.5 9828.0 9867.0 9866.5 9888.5 9888.0 10036.0 10036.0 10113.5 10113.5 10171.5 10171.5 10226.0 10226.0 $ REMARKS: FLOWING PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH SHIFTED TO OPEN HOLE GAMMA RAY. NO SPECTRUM DATA WAS RECORDED FOR THIS PASS (no BIF, CSLS, or SGMB curves). $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BKL PDK 68 1 CPS 3 BKS PDK 68 1 CPS 4 LS PDK 68 1 CPS 5 SS PDK 68 1 CPS 6 MSD PDK 68 1 CU 7 RATO PDK 68 1 8 RBOR PDK 68 1 9 RICS PDK 68 1 10 RIN PDK 68 1 11 SGMA PDK 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 06 511 09 0 4 39 705 61 6 4 74 169 61 6 4 71 162 89 6 4 05 626 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 6 4 96 761 61 44 * DATA RECORD (TYPE# 0) Total Data Records: 66 1014 BYTES * Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16405 datums Tape Subfile: 2 208 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9578.0 10210.0 9594.0 10222.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9543.0 9543.0 9581.5 9583.0 9600.5 9604.0 9605.5 9617.5 9620.5 9621.5 9629.0 9630.0 9645.0 9647.0 9647.5 9649.0 9651.5 9652.5 9754.0 9755.0 9755.5 9756.0 9756.5 9762.5 9762.5 9786.0 9815.0 9816.0 9824.0 9825.0 9825.0 9827.0 9871.0 9877.5 9878.5 9879.5 9889.0 9889.5 9894.5 9895.0 9901.0 9902.5 9903.5 9904.5 10035.0 10036.0 10036.5 in separate files. EQUIVALENT UNSHIFTED DEPTH - SGMA 9543.0 9601.5 9618.5 9621.0 9645.5 9648.0 9648.5 9649.5 9652.0 9652.5 9754.0 9754.5 9755.0 9756.0 9756.5 9786.5 9815.5 9816.0 9824.0 9827.5 9871.5 9878.5 9879.5 9880.0 9901.5 9903.5 9904.5 9905.0 10036.0 10053.0 10069.5 10097.5 10107.5 10108.5 10114.0 10117.0 10121.0 10163.5 10165.0 10165.5 10172.0 10177.0 10201.0 10209.0 10217.0 10226.0 $ REMARKS: 10064.0 10069.5 10098.5 10107.5 10108.5 10114.5 10117.5 10122.0 10164.0 10165.5 10166.0 10173.0 10173.0 10178.0 10204.5 10209.5 10218.0 10226.0 10226.0 BASE PASS 1 ALL PDK CURVES WERE SHIFTED WITH SGMA. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 06 511 09 0 4 4 00 201 24 1 4 4 39 705 61 6 4 4 74 169 61 6 4 4 00 201 24 1 4 4 71 162 89 6 4 4 05 626 89 6 4 4 00 201 24 1 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 96 761 61 6 4 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 86 Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20506 datums Tape Subfile: 3 170 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9580.0 10181.0 9598.0 10193.0 BASELINE DEPTH GRCH 9543.0 9543.0 9583.5 9585.0 9602.5 9603.5 9605.0 9618.0 9618.5 9628.5 9629.0 9629.5 9629.5 9631.0 9631.5 9632.0 9632.5 9647.0 9649.5 9651.5 9652.5 9677.0 9708.5 9736.5 9739.0 9748.5 9753.0 9754.0 9755.0 9762.0 9764.5 9764.5 9822.5 9822.5 9823.5 9823.0 9825.0 9824.5 9860.5 9871.0 9871.5 9871.5 9919.0 10002.5 10003.0 10031.5 10035.5 10036.0 10036.5 10053.5 10054.0 10097.0 10098.0 10107.0 in separate files. (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 9543.0 9603.0 9647.5 9649.5 9651.5 9652.0 9676.5 9708.5 9736.5 9739.5 9748.5 9753.0 9753.5 9754.5 9762.0 9860.5 9872.0 9919.5 10032.5 10037.5 10107.5 10108.0 10108.5 10109.0 10113.5 10163.0 10164.0 10165.0 10165.5 10166.0 10167.0 10172.5 10173.0 10177.5 10178.0 10226.0 $ REMARKS: 10114.0 10163.5 10164.0 10165.0 10166.0 10166.5 10174.0 10226.0 10108.0 10108.5 10109.5 10167.5 10173.5 10178.5 10179.0 10226.0 BASE PASS 2. ALL PDK CURVES WERE SHIFTED WITH SGMA. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 71 162 89 6 4 05 626 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 86 966 BYTES * Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 36911 datums Tape Subfile: 4 168 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9581.0 10181.0 9599.0 10193.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9543.0 9543.0 9595.5 9596.5 9603.5 9604.0 9606.5 9607.5 9618.5 9619.0 9626.5 9627.0 9627.5 9627.5 9629.0 9629.5 9637.5 9638.0 9640.5 9640.5 9641.0 9641.0 9645.0 9645.5 9647.0 9647.5 9649.5 9649.0 9651.0 9650.5 9652.0 9651.0 9652.5 9652.0 9709.0 9709.0 9713.5 9713.0 9727.0 9727.0 9730.0 9729.5 9732.0- 9731.5 9734.5 9734.5 9739.0 9739.5 9739.5 9740.0 9741.0 9741.0 9753.5 9753.5 9754.5 9754.0 9768.0 9768.0 9801.5 9801.0 9822.5 9822.0 9823.0 9823.0 9824.0 9824.0 9823.5 9825.0 9824.5 9825.0 9828.5 9828.0 9840.0 9840.5 9850.0 9849.5 in separate files. EQUIVALENT UNSHIFTED DEPTH ......... SGMA 9543.0 9857.5 9859.0 9863.5 9865.5 9872.5 9878.5 9882.0 9888.5 9900.5 9913.5 9914.5 10035.5 10107.5 10108.0 10118.5 10119.5 10120.0 10120.5 10161.5 10164.0 10164.5 10168.0 10172.5 10173.0 10177.5 10178.0 10226.0 $ REMARKS: 9857.0 9863.5 9865.5 9889.0 10108.0 10173.0 10173.5 10226.0 9859.0 9873.0 9879.0 9882.0 9901.0 9914.0 9914.5 10036.0 10108.5 10119.0 10119.5 10120.5 10121.0 10161.0 10163.5 10164.5 10168.0 10178.0 10178.5 10226.0 BORAX PASS 1 (25 BBL BORAX AWAY). ALL PDK CURVES WERE SHIFTED WITH SGMA. DUE TO PHYSICAL TAPE ERROR ON SPECTRUM TAPE, NO SPECTRUM DATA (BIF, CSLS, & SGMB) WAS RECOVERED ABOVE 9900'. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: 1 2 3 4 5 6 Name Tool Code Samples Units GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 71 162 89 6 7 SS PDK 68 1 CPS 4 8 MSD PDK 68 1 CU 4 9 RATO PDK 68 1 4 10 RBOR PDK 68 1 4 11 RICS PDK 68 1 4 12 RIN PDK 68 1 4 13 SGMA PDK 68 1 CU 4 14 SGMB PDK 68 1 CU 4 * DATA RECORD (TYPE# 0) Total Data Records: 86 966 BYTES * 4 05 626 89 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 56 Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 41012 datums Tape Subfile: 5 183 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate PASS NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9582.0 10182.0 9601.0 10194.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9543.0 9543.0 9596.0 9598.0 9598.5 9600.0 9602.5 9604.5 9605.5 9608.0 9608.5 9623.0 9623.5 9627.5 9628.0 9629.5 9630.0 9630.5 9632.0 9633.0 9640.0 9640.5 9641.0 9646.5 9647.0 9649.5 9651.5 9652.5 9657.5 9658.0 9732.5 9739.0 9741.5 9742.0 9748.0 9754.0 9755.0 9762.5 9763.0 9771.0 9771.0 9792.5 9794.0 9820.5 9824.0 9826.0 9826.0 9827.5 9871.0 9871.5 files. EQUIVALENT UNSHIFTED DEPTH ......... SGMA 9543.0 9606.0 9628.0 9629.0 9631.0 9641.5 9647.5 9648.0 9650.0 9652.0 9652.5 9732.5 9740.0 9742.0 9742.5 9748.0 9754.0 9754.5 9762.5 9763.0 9793.0 9794.5 9820.5 9824.0 9828.0 9914.5 10035.0 10036.0 10046.0 10053.5 10069.5 10115.5 10117.5 10118.0 10120.0 10120.5 10121.0 10162.5 10164.5 10165.0 10165.5 10174.5 10175.0 10226.0 $ REMARKS: 9915.0 10035.5 10036.0 10047.0 10054.5 10069.5 10115.5 10117.5 10118.5 10120.5 10121.0 10121.0 10162.5 10164.5 10165.5 10165.5 10175.0 10175.5 10226.0 10226.0 BORAX PASS 2 (60 BBL BORAX AWAY). ALL PDK CURVES WERE SHIFTED WITH SGMA. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 I CU GAPI 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 71 162 89 6 4 05 626 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 86 966 BYTES * Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 57417 datums Tape Subfile: 6 172 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 9574.0 10187.0 9598.0 10199.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 9543.0 9543.0 9595.0 9596.5 9597.0 9598.5 9598.0 9599.0 9603.0 9605.5 9606.0 9606.5 9607.5 9609.5 9610.0 9616.0 9616.5 9622.5 9622.5 9628.0 9635.5 9636.0 9640.0 9640.5 9646.0 9661.5 9701.5 9704.0 9713.5 9713.5 9739.0 9747.5 9751.0 9752.0 9755.0 9756.0 9768.5 9768.5 9772.5 9783.0 9783.0 9794.5 9813.0 9814.0 9815.0 9834.0 9865.0 9868.0 9872.0 9872.0 9873.0 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 9543.0 9603.0 9605.5 9606.5 9628.5 9646.0 9661.5 9701.0 9703.5 9739.5 9747.5 9751.0 9751.5 9754.5 9756.5 9772.5 9794.5 9813.5 9814.5 9815.0 9834.0 9865.5 9868.5 9873.0 9879.0 9879.5 10035.5 10045.5 10053.0 10069.0 10108.0 10113.5 10141.5 10162.0 10163.0 10163.5 10165.5 10172.5 10173.0 10173.5 10178.0 10178.5 10226.0 $ REMARKS: 9879.0 9880.0 10036.0 10046.5 10054.0 10069.0 10108.5 10114.0 10142.0 10162.0 10163.0 10164.0 10166.0 10173.5 10174.0 10174.5 10178.5 10179.5 10226.0 10226.0 FLUSH PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Tool Code Samples Units GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS SS PDK 68 1 CPS MSD PDK 68 1 CU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 SGMA PDK 68 1 CU SGMB PDK 68 1 CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 06 511 09 0 4 4 00 201 24 1 4 4 39 705 61 6 4 4 74 169 61 6 4 4 00 201 24 1 4 4 71 162 89 6 4 4 05 626 89 6 4 4 00 201 24 1 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 23 260 40 0 4 4 96 761 61 6 4 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 86 966 BYTES * Tape File Start Depth = 10226.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61518 datums Tape Subfile: 7 172 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH PDK $ REMARKS: 1 2, 3 AVERAGED BASE PASS. PDK CURVES WERE AVERAGED FROM THE 2 BASE PASSES. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 SS PDK 68 1 CPS 4 8 MSD PDK 68 1 CU 4 9 RATO PDK 68 1 4 10 RBOR PDK 68 1 4 11 RICS PDK 68 1 4 12 RIN PDK 68 1 4 13 SGMA PDK 68 1 CU 4 14 SGMB PDK 68 1 CU 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 00 201 24 1 4 71 162 89 6 4 05 626 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 56 * DATA RECORD (TYPE~ 0) 966 BYTES * Total Data Records: 84 Tape File Start Depth = 10226.000000 Tape File End Depth = 9562.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 77353 datums Tape Subfile: 8 106 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9558.0 PDK 9570.0 $ LOG HEADER DATA STOP DEPTH 10208.0 10220.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 23 -APR- 93 FSYS REV. J001 VER. 1.1 1212 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL NUMBER 2725XA 2324NA 2120XA 0.000 10328.0 0.0 PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 625 FAR COUNT RATE HIGH SCALE (CPS): 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: FLOWING PASS. NO SPECTRUM DATA RECORDED FOR THIS PASS (BIF, CSLS, & SGMB) . $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT' RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BKL PDK 68 1 CPS 4 3 BKS PDK 68 1 CPS 4 4 CCL PDK 68 1 4 5 CCLT PDK 68 1 4 6 CSS PDK 68 1 CPS 4 7 G1 PDK 68 1 CPS 4 8 G2 PDK 68 1 CPS 4 9 ISS PDK 68 1 CPS 4 10 LS PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 15 RIN PDK 68 1 4 16 SGMA PDK 68 1 CU 4 17 SS PDK 68 1 CPS 4 18 SPD PDK 68 1 F/MN 4 4 06 511 09 0 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 92 630 79 6 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 00 201 24 1 4 71 162 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 05 626 89 6 4 05 626 89 6 72 * DATA RECORD (TYPE# O) Total Data Records: 210 994 BYTES * Tape File Start Depth = 10223.000000 Tape File End Depth = 9543.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 113218 datums Tape Subfile: 9 286 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9578.0 PDK 9589.0 $ LOG HEADER DATA STOP DEPTH 10211.0 10223.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT)' LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX-. ~TRIX DENSITY: HOLE CORRECTION (IN): 23-APR-93 FSYS REV. J001 VER. 1.1 1404 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL NUMBER 2725XA 2324NA 2120XA 0.000 10328.0 0.0 PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 625 FAR COUNT RATE HIGH SCALE (CPS): 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: BASE PASS 1. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CCLT PDK 68 1 4 7 CSLS PDK 68 1 CU 4 8 CSS PDK 68 1 CPS 4 9 G1 PDK 68 1 CPS 4 10 G2 PDK 68 1 CPS 4 11 ISS PDK 68 1 CPS 4 12 LS PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SS PDK 68 1 CPS 4 21 SPD PDK 68 1 F/MN 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 00 201 24 1 4 71 162 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 4 05 626 89 6 84 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 242 Tape File Start Depth = 10226.000000 Tape File End Depth = 9562 000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 135808 datums Tape Subfile: 10 317 records... Minimum record length: Maximum record length: 62 bytes 974 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW C[/RVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3- DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9580.0 PDK 9592.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10185.0 10197.0 23-APR-93 FSYS REV. J001 VER. 1.1 1443 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 2725XA 2324NA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10328.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 625 FAR COUNT RATE HIGH SCALE (CPS): 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: BASE PASS 2. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CCLT PDK 68 1 4 7 CSLS PDK 68 1 CU 4 8 CSS PDK 68 1 CPS 4 9 G1 PDK 68 1 CPS 4 10 G2 PDK 68 1 CPS 4 11 ISS PDK 68 1 CPS 4 12 LS PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SS PDK 68 1 CPS 4 21 SPD PDK 68 1 F/MN 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 00 201 24 1 4 71 162 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 4 05 626 89 6 84 * DATA RECORD (TYPE# 0) Total Data Records: 230 974 BYTES * Tape File Start Depth = 10200.000000 Tape File End Depth = 9568.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 168857 datums Tape Subfile: 11 305 records... Minimum record length: Maximum record length: 62 bytes 974 bytes Tape Subfile 12 is type: LIS FILE HEADER FILE NUMBER: 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9581.0 PDK 9593.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10186.0 10198.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 23-APR-93 FSYS REV. J001 VER. 1.1 1534 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL NUMBER 2725XA 2324NA 2120XA 0.000 10328.0 0.0 PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 625 FAR COUNT RATE HIGH SCALE (CPS): 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: BORAX PASS 1 (25 BBL BORAX AWAY). DUE TO PHYSICAL TAPE ERROR ON SPECTRUM TAPE, NO SPECTRUM DATA (BIF, CSLS, & SGMB) WAS RECOVERED ABOVE 9900'. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CCLT PDK 68 1 4 7 CSLS PDK . 68 1 CU 4 $ CSS PDK 68 1 CPS 4 9 G1 PDK 68 1 CPS 4 10 G2 PDK 68 1 CPS 4 11 ISS PDK 68 1 CPS 4 12 LS PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SS PDK 68 1 CPS 4 21 SPD PDK 68 1 F/MN 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 00 201 24 1 4 71 162 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 4 05 626 89 6 84 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 230 Tape File Start Depth = 10201.000000 Tape File End Depth = 9569.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 191447 datums Tape Subfile: 12 308 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 13 is type: LIS FILE HEADER FILE NUMBER: 12 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 5 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9582.0 PDK 9594.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10187.0 10200.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX-DENSITY: HOLE CORRECTION (IN): 23-APR-93 FSYS REV. J001VER. 1.1 1618 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL NUMBER 2725XA 2324NA 2120XA 0.000 10328.0 0.0 PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 625 FAR COUNT :RATE HIGH SCALE (CPS): 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): 0.0 REMARKS: BORAX PASS 2 (60 BBL BORAX AWAY). $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CCLT PDK 68 1 4 7 CSLS PDK 68 1 CU 4 8 CSS PDK 68 1 CPS 4 9 G1 PDK 68 1 CPS 4 10 G2 PDK 68 1 CPS 4 11 ISS PDK 68 1 CPS 4 12 LS PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SS PDK 68 1 CPS 4 21 SPD PDK 68 1 F/MN 4 4 06 511 09 4 00 201 24 4 39 705 61 4 74 169 61 4 92 630 79 4 92 630 79 4 00 201 24 4 00 201 24 4 35 975 96 4 36 631 32 4 00 201 24 4 71 162 89 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 05 626 89 4 05 626 89 0 1 6 6 6 6 1 1 1 1 1 6 1 0 0 0 0 6 1 6 6 84 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 231 Tape File Start Depth = 10203.000000 Tape File End Depth = 9570.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 224584 datums Tape Subfile: 13 306 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 14 is type: LIS FILE HEADER FILE NUMBER: 13 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 6 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9574.0 PDK 9586.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10188.0 10200.0 23-APR-93 FSYS REV. J001 VER. 1.1 1724 23-APR-93 10239.0 10226.0 9600.0 10225.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ TOOL NUMBER 2725XA 2324NA 2120XA BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 10328.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED/SW - BORAX 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 625 FAR COUNT RATE HIGH SCALE (CPS) : 3125 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 60000 TOOL STANDOFF (IN): 0.0 REMARKS: FLUSH PASS. $ CN : BP EXPLORATION WN : H - 20 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CCLT PDK 68 1 4 7 CSLS PDK 68 1 CU 4 8 CSS PDK 68 1 CPS 4 9 G1 PDK 68 1 CPS 4 10 G2 PDK 68 1 CPS 4 11 ISS PDK 68 1 CPS 4 12 LS PDK 68 1 CPS 4 13 MSD PDK 68 1 CU 4 14 RATO PDK 68 1 4 15 RBOR PDK 68 1 4 16 RICS PDK 68 1 4 17 RIN PDK 68 1 4 18 SGMA PDK 68 1 CU 4 19 SGMB PDK 68 1 CU 4 20 SS PDK 68 1 CPS 4 21 SPD PDK 68 1 F/MN 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 35 975 96 1 4 36 631 32 1 4 00 201 24 1 4 71 162 89 6 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 05 626 89 6 4 05 626 89 6 84 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 233 Tape File Start Depth = 10203.000000 Tape File End Depth = 9563.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 247790 datums Tape Subfile: 14 308 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 15 is type: LIS 93/6/15 01 **** REEL TRAILER **** 93/ 6/17 01 Tape Subfile: 15 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 17 JUN 93 4:17p Elapsed execution time = 2 minutes, 2.7 seconds. SYSTEM RETURN CODE = 0 FEB 1 4 19.07 Oil & Ga.~ C~s. Comr~ior~ * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : BP EXPLORATION WELL NAME : H-20 (42-16-11-13) FIELD NAI~E : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292089600 REFERENCE NO : 97024 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 **** REEL HEADER **** SERVICE NAME : EDIT DATE · 97/02/ 3 ORIGIN ' FLIC REEL NAME : 97024 CONTINUATION # : PREVIOUS REEL : COf4PIE~Ff - BP EXPLORATION, PRUDHOE BAY, H-20(42-16-11-13),API #50-029-20896-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/02/ 3 ORIGIN ' FLIC TAPE NAME : 97024 CONTINUATION # : 1 PREVIOUS TAPE : COFk~_~CT ' BP EXPLORATION, PRUDHOE BAY, H-20 (42-16-11-13) ,API ~50-029-20896-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: H-20 (42-16-11-13) API NUMBER: 500292089600 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 31-JAN-97 JOB NUMBER: 97024 LOGGING ENGINEER: S. DECKERT OPERATOR WITNESS: J. HEUSSER SURFACE LOCATION SECTION: 21 TOWNSHIP: lin RANGE: 13E FNL: 480 FSL: FEL: 1735 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 80.20 DERRICK FLOOR: 79.20 GROUND LEVEL: ' 45. O0 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT)WEIGHT (LB/FT) 9. 625 9457.0 47. O0 7. 000 10328.0 26. O0 5.500 9156.0 17.00 4.500 9281.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88887.0 88888.0 10189.0 10188.0 10181 . 0 10178.0 10175.0 10173.5 10173.0 10172.0 10171.5 10171.5 10170.0 10169.0 10168.0 10169.0 10158.5 10157.0 10149.5 10148.5 10123.0 10124.0 10121.5 10120.5 10118.5 10118.0 10117.5 10119.0 10115.0 10117.5 10113.0 10113.5 10113.5 10089.5 10090.0 10089.0 10089.0 10088.5 10089.0 10085.5 10086.0 10085.0 10086.0 10073.5 10073.5 10068.5 10068.0 10066.5 10068.0 10054.0 10051.5 10046.5 10046.5 10040.0 10040.0 10036.0 10036.0 10029.0 10028.5 10014.0 10013.5 10013.5 10014.0 10003.0 10003.0 10002.5 10003.0 9995.0 9994.5 9992.5 9993.0 9987.5 9987.0 9980.5 9980.5 9963.0 9963.5 9947.0 9946.5 9946.5 9938.0 9939.0 9929.5 9929.5 9929.0 9929.5 9923.5 9922.0 9923.0 9922.5 9912.5 9913.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9892.5 9890.0 9889.5 9887.0 9870.0 9866.5 9866.0 9862.0 9856.5 9848.5 9839.5 9833.0 9828.0 9819.5 9817.0 9811.0 9796.5 9794.0 9791.0 9789.0 9783.0 9782.5 9767.5 9767.0 9758.5 9748.0 9740.5 9737.5 9734.0 9731.0 9728.5 9716.0 9712.5 9712.0 971 O. 5 9704.0 9694 5 9681 5 9670 0 9667 0 9642 5 9639 5 9635 0 9634 5 9622 5 9621 5 9614 5 9612 0 9611 0 9610 5 9608 5 9607 5 9605 0 9602 0 9597 0 9593 0 9893.0 9890.0 9887.5 9871.5 9866.5 9860.5 9857.0 9849.0 9840.0 9833.5 9829.0 9820.0 9819.0 9810.0 9797.5 9795.0 9788.5 9783.5 9768.0 9759.0 9749.0 9735.0 9732.0 9729.5 9718.5 9714.0 9711.5 9705.0 9696.0 9671.5 9669.0 9642.5 9640.5 9635.5 9623.5 9615.0 9611.0 9607.5 9602.5 9597.0 9593.5 9890.0 9887.5 9866.5 9840.0 9792.5 9783.5 9768.0 9741.5 9738.0 9735.0 9714.0 9681.5 9640.5 9635.5 9623.5 9612.5 9611.5 9607.5 9602.5 3-FEB-1997 08:35 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 9585.5 9585.5 9580.5 9580.0 9579.0 9578.0 9576.5 9575.5 9573.5 9571.0 9571 . 0 9571 . 0 9565.0 9565.5 9554.5 9554.0 9548.5 9548.5 9548.5 9545.5 9545.0 9544.5 9545.0 9530.0 9530.5 9523.5 9524.0 9524.5 9490.5 9491.5 9489.0 9491.0 9487.5 9488.5 9485.5 9487.0 9483.0 9484.0 9457.0 9459.5 9447.0 9447.5 9435.0 9437.0 9431.0 9432.0 9429.0 9429.0 9425.5 9425.0 9408.0 9407.5 9400.0 9402.0 9398.0 9398.5 100.0 102.0 100.5 CONTAINED HEREIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION'S H-20(42-16-11-13) WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND GR.BCS; AND NPHI PASS #1 AND GR.BCS. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NAM~ : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: DEPTH INCREFiENT: 0.5000 FILE SUM~iARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10191.0 9392.0 CNTD 10216.0 9392.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD REM3LRKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE APIAPI API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 553714 NPHI CNTD PU-S 553714 O0 000 O0 0 1 1 1 4 68 0000000000 ArRAT CNTD 553714 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 553714 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 553714 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 553714 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 553714 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 553714 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 553714 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 553714 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 553714 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10216.000 NPHI,CNTD 21.576 NRAT. CNTD 3.667 CRAT. CNTD NCNT. CNTD 4334.511 FCNT, CNTD 1132.075 CFTC. CNTD 1069.205 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1320.000 CCL.CNTD 0.000 DEPT. 9392.500 NPHI, CNTD 52.150 NRAT. CNTD 7.846 CRAT. CNTD NCNT. CNTD 2002. 454 FCNT, CNTD 260. 325 CFTC. CNTD 259.161 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1365. 000 CCL. CNTD -0.106 3. 964 4398. 523 7.570 2029.853 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: FILE HEADER FILE NOY4~ER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 2 DEPTH INCREMENT: 0.5000 FILE SUFff4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10191.0 9381.0 CNTD 10216.0 9381.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 10209.5 10199.5 10189.0 10179.0 10174.0 10172.5 10170.5 10169.0 10161.0 10158.0 10155.5 10149.0 10125.5 10124.0 10115.5 10114.0 10109.0 10105.5 10098.5 10096.5 10093.0 10088.5 10086.5 10086.0 10083.0 10077.0 10073.5 10068.5 10066.0 10061.5 10056.5 10053.0 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD 88887.0 88888.5 10210.0 10200.0 10188.0 10176.5 10173.5 10171.5 10169.0 10168.5 10161.5 10157.0 10154.5 10148.0 10125.5 10123.5 10117.0 10113.5 10113.5 10108.5 10105.0 10098.0 10096.5 10092.0 10089.0 10086.0 10086.0 10082.5 10076.0 10073.0 10068.0 10067.5 10058.5 10053.5 10053.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 10050.5 10050.5 10050.0 10048.0 10047.0 10046.5 10046.0 10046.0 10044.0 10041.5 10041.5 10040.0 10037.0 10036.5 10036.5 10036.0 10031.5 10030.5 10027.5 10026.5 10024.5 10023.0 10023.0 10022.0 10019.5 10018.5 10009.0 10009.5 10006.5 10005.5 10001.0 10000.5 9992.5 9992.5 9988.5 9987.0 9984.0 9982.5 9981.0 9980.5 9975.0 9973.5 9970.0 9970.0 9963.0 9962.0 9956.5 9955.5 9948.0 9946.5 9947.5 9946.5 9939.0 9938.5 9930.0 9929.0 9929.5 9929.0 9926.0 9926.5 9914.0 9913.5 9912.0 9912.0 9900.5 9900.0 9890.5 9890.5 9890.0 9887.5 9887.5 9887.0 9876.5 9877.0 9876.0 9875.5 9868.5 9869.0 9867.0 9866.5 9866.5 9854.0 9853.5 9849.0 9848.5 9840.5 9840.5 9840.0 9840.0 9833.0 9833.0 9832.5 9828.5 9829.0 9824.5 9825.5 9822.5 9822.5 9820.5 9820.0 9818.0 9819.0 9816.5 9816.5 9814.5 9815.5 9804.0 9804.0 9802.0 9802.0 9794.5 9794.5 9784.0 9783.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9783.0 9783.0 9768.0 9768.0 9767.5 9768.0 9758.5 9759.0 9756.0 9756.0 9747.0 9747.0 9738.5 9738.0 9734.5 9735.0 9735.0 9727.5 9729.5 9725.5 9726.0 9716.0 9718.5 9713.5 9714.0 9713.0 9714.0 9707.0 9708.5 9701.0 9702.0 9700.0 9700.0 9696.0 9696.0 9681 . 5 9681 . 0 9676.5 9676.0 9671 . 0 9671 . 5 9664.0 9664.0 9656.5 9657.0 9656.0 9656.5 9649.5 9648.5 9640.0 9640.0 9640.5 9638.0 9638.5 9637.5 9637.5 9635.0 9635.0 9627.5 9627.5 9623.0 9623.0 9622.0 9623.0 9618.0 9619.0 9616.0 9616.5 9615.0 9615.0 9613.0 9612.5 9611 . 5 9611 . 0 9611 . 0 9609.0 9606.5 9608.5 9607.0 9604.0 9602.5 9603.0 9602.5 9598.5 9595.5 9597.5 9597.0 9592.5 9590.5 9590.5 9588.0 9587.0 9585.5 9580.5 9579.5 9577.5 9575.5 9571.5 9570.5 9566.0 9565.5 9565.5 9564.5 9564.0 9563.0 9558.5 9557.0 9554.5 9554.0 9554.0 9552.5 9549.0 9548.5 9548.5 3-FEB-1997 08:35 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 10 9546.0 9545.0 9542.0 9541.5 9531.0 9529.0 9524.5 9524.0 9520.5 9514.0 9513.0 9511.0 9502.5 9491.0 9489.5 9488.5 9486.5 9485.0 9480.5 9473.5 9473.0 9470.0 9461.5 9460.5 9456.0 9452.0 9448.5 9439.5 9435.0 9432.5 9425.0 9422.0 9421.0 9419.0 9417 5 9413 0 9411 5 9410 5 9407 0 9403 5 9402 5 9400 5 9398 0 100 0 $ 9545.0 9540.5 9530.5 9524.0 9513.5 9503.0 9491.5 9487.0 9480.5 9471.5 9468.5 9459.0 9448.0 9435.5 9421.5 9412.5 9405.5 9401.5 101. 0 9545.0 9541.5 9531.0 9529.0 9524.0 9521.0 9513.5 9511.0 9490.5 9488.5 9485.5 9482.5 9471.5 9461.5 9456.0 9452 0 9450 0 9441 0 9436 5 9432 0 9425 0 9420.0 9418.0 9416.5 9415.0 9410.5 9407.5 9400.5 9396.5 98.5 REFXAPU<S: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRCH PASS #2 TO GRCH PASS #1; AND NPHI PASS #2 TO NPHI PASS #1. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAFiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553714 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 553714 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 553714 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 553714 O0 000 O0 0 2 1 1 4 68 0000000000 NCNTCNTD CPS 553714 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTD CPS 553714 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 553714 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 553714 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 553714 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 553714 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 553714 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10216.500 NPHI. CNTD 21.335 NRAT. CNTD 3.967 CRAT. CNTD NCNT. CNTD 4271.413 FCNT. CNTD 1085.651 CFTC. CNTD 1079.733 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1320.000 CCL.CNTD 0.000 DEPT. 9379.500 NPHI.CNTD 49.674 NRAT. CNTD 7.067 CRAT. CNTD NCNT. CNTD 1960.694 FCNT. CNTD 277.136 CFTC. CNTD 266.742 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1315.000 CCL.CNTD 0.000 3.932 4422.250 7.287 2026.164 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 12 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION . 0 O1 CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUB~W~RY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10191.0 9388.0 ClFi~D 10216.0 9388.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUFiBER : 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88887.5 88889.0 10212.5 10213.5 10197.5 10198.5 10188.5 10188.0 10188.0 10188.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 13 10179.5 10173.5 10172.0 10170.5 10168.5 10162.5 10160.5 10158.0 10155.5 10144.0 10142.0 10135.0 10134.5 10132.0 10124.5 10122.5 10115.0 10113.5 10108.0 10103.5 10101.5 10098.0 10096.0 10092.0 10090.0 10087.0 10085.5 10082.5 10073.5 10068.5 10066.0 10063.5 10062.0 10057.0 10054.5 10049.0 10046.5 10045.0 10036.5 10033.5 10028.0 10022.5 10018.0 10010.5 10007.5 10006.0 10003.0 10002 5 10001 0 9995 5 9987 0 9985 0 9981 0 9974 5 9970 0 10176.5 10173.5 10168.5 10159.5 10140.5 10134.5 10130.0 10120.5 10113.5 10103.0 10098.0 10088.5 10087.5 10086.0 10068.0 10058.5 10051.0 10048.5 10046.5 10036.0 10023.0 10007.0 10002.5 9987.0 9984.5 10171.5 10169.0 10161.5 10156.5 10154.5 10144.0 10135.0 10125.5 10117.5 10113.5 10108.5 10105.0 10096.5 10092.0 10082.5 10073.5 10068.0 10064.0 10058.0 10046.0 10036.5 10034.0 10027.0 10017.0 10009.5 10006.0 10003.0 10001.0 9994.5 9980.5 9973.5 9969.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 14 9966.5 9966.0 9964.5 9962.5 9963.0 9963.5 9956.0 9955.5 9947.0 9946.5 9946.5 9945.0 9945.0 9938.0 9937.0 9929.5 9929.0 9929.0 9929.0 9919.0 9918.0 9912.5 9912.5 9911.0 9911.0 9890.0 9890.0 9889.5 9890.0 9887.0 9887.5 9887.5 9875.5 9875.5 9870.5 9871.0 9866.5 9866.5 9866.5 9856.5 9856.5 9856.0 9856.5 9853.5 9853.5 9848.5 9848.0 9848.0 9848.5 9840.0 9840.0 9839.5 9840.0 9837.0 9837.5 9833.0 9833.0 9827.5 9828.5 9822.0 9822.5 9820.0 9820.5 9819.0 9820.0 9816.0 9816.5 9809.0 9809.5 9802.0 9802.5 9796.5 9797.5 9792.5 9792.5 9790.5 9792.0 9783.0 9783.5 9782.5 9783.0 9781.5 9781.0 9771.5 9771.0 9767.5 9768.0 9767.0 9768.0 9763.0 9764.0 9758.5 9759.0 9756.0 9756.0 9753.5 9754.0 9746.0 9747.0 9734.0 9735.0 9733.5 9735.0 9724.0 9726.0 9712.5 9714.0 9714.0 9704.0 9705.0 9699.0 9700.0 9681.0 9681.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 15 9671.5 9671.5 9665.5 9665.5 9663.5 9664.0 9656.0 9657.0 9656.5 9651.0 9650.0 9643.0 9642.5 9639.5 9640.5 9640.5 9635.5 9635.5 9635.0 9635.5 9630.5 9631.0 9624.5 9626.0 9622.0 9623.0 9621.5 9623.0 9619.5 9620.0 9614.5 9615.0 9611.0 9611.0 9611.0 9608.5 9607.0 9608.0 9607.5 9605.0 9602.5 9602.5 9601.0 9602.0 9602.5 9597.0 9597.0 9594.5 9593.0 9590.5 9590.0 9588.0 9588.0 9586.0 9586.5 9585.5 9580.5 9579.5 9577.0 9575.5 9573.5 9571.0 9571 . 0 9570 . 5 9568.5 9568.0 9567.5 9566.0 9565.5 9565.5 9565.0 9563.5 9563.5 9561 . 5 9559.5 9558.0 9558.0 9557.0 9554.5 9554.0 9553.5 9552.5 9550.5 9550.0 9545.5 9545.0 9545.0 9545.0 9541.0 9541.0 9530.5 9530.5 9531.0 9528.5 9529.0 9524.0 9524.0 9523.5 9524.0 9520.0 9521.0 9512.5 9513.5 9510.5 9511.0 9507.0 9507.0 9490.5 9491.5 9489.5 9491.0 9488.0 9488.5 9485.5 9487.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 16 9484.5 9483 5 9480 0 9478 5 9475 0 9470 0 9464 0 9463 5 9462 0 9457.0 9456.5 9452.0 9448.0 9446.5 9440.5 9439.0 9430.5 9427.0 9422.5 9420.5 9418.5 9412.0 9407.5 9404.5 9400.0 9398.5 100.0 $ 9485.0 9484.0 9466.0 9459.0 9448.0 9440.5 9428.0 9406.0 9402.0 102.0 9485.5 9482.5 9480.0 9477.0 9472.5 9466.5 9463.0 9458.0 9451.5 9448.0 9439.0 9432.0 9423.0 9422.0 9419.5 9411.0 9407.5 9398.0 99.5 REMARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT GRCH PASS #3 TO GRCH PASS #1; AND NPHI PASS #3 TO NPHI PASS #1. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 17 TYPE REPR CODE VALUE 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** N~IE SERV UNIT SERVICE API API API API FILE N-JMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 553714 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 553714 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 553714 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 553714 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 553714 O0 000 O0 0 3 1 1 4 68 0000000000 FCNTCNTD CPS 553714 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 553714 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC ClVTD CPS 553714 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 553714 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 553714 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 553714 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10217.000 NPHI. CNTD 21.696 NRAT. CNTD 3.818 CRAT. CNTD NCNT. CNTD 4332.056 FCNT. CNTD 1125.320 CFTC. CNTD 1065.984 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1405.000 CCL.CNTD 0.000 DEPT. 9387.500 NPHI.CNTD 51.123 NRAT. CNTD 7.667 CRAT. CNTD NCNT. CNTD 1759.591 FCNT. CNTD 240.602 CFTC. CNTD 244.488 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1330.000 CCL.CNTD 0.000 3.981 4439.817 7.453 1864.353 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 18 **** FILE HEADER **** FILE NAFiE : EDIT .004 SERVICE · FLIC VERSION · O01CO1 DATE · 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMFiVT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTD REMARKS: THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 19 ** SET TYPE - CHAN ** NAblE SERV UNIT SERVICE API API API API FILE I~IMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553714 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 553714 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 553714 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 553714 O0 000 O0 0 4 1 1 4 68 0000000000 NCNTCNAV CPS 553714 O0 000 O0 0 4 1 1 4 68 0000000000 FCNTCNAV CPS 553714 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 553714 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 553714 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 553714 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 553714 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10216.000 NPHI.CNAV 21.331 NRAT. CNAV 3. 777 CRAT. CNAV NCNT. CNAV 4318.395 FCNT. CNAV 1126.101 CFTC. CNAV 1083.850 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1320. 000 DEPT. 9392.500 NPHI.CNAV 51.164 NRAT. CNAV 7.410 CRAT. CNAV NCNT. CNAV 1897.676 FCNT. CNAV 261.362 CFTC. CNAV 254.067 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1365.000 3.931 4448.310 7.457 1984.363 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 20 FILE HEADER FILE~ER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NU~BER: 1 DEPTH INCRE~!ENT: 0.5000 FILE SU~FiARY VENDOR TOOL CODE START DEPTH CNTD 10216.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: II) DRILLER (FT): STOP DEPTH 9400.0 TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 1 -JAN-97 CP42.2 1344 O1 -JAN-97 10201.0 10219.0 9400.0 10216.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAI~V~A RAY CNTD COMP. NEUTRON $ TOOL NUMBER CGRS-A 795 CNT-D 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 10328.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC SONIC DATED lO-FEB-83. LOGGED WITH SANDSTONE MATRIX. PUMPED TOTAL 401 BBLS SEAWATER. THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA PAGE: 21 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553714 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 553714 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 553714 O0 000 O0 0 5 1 1 4 68 0000000000 TIFRA PS1 553714 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 553714 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EbEM CODE (HEX) RCFT PS1 CPS 553714 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 553714 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 553714 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 553714 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 553714 O0 000 O0 0 5 1 1 4 68 0000000000 22 ** DATA ** DEPT. 10244.500 NPHI.PS1 22.051 RTIFR.PS1 4.000 TNRA.PS1 RCNT. PSl 4221.437 RCFT. PS1 1055.359 CNTC.PS1 4336.396 CFTC. PSI GR.PS1 20.016 TENS.PSi 900.000 DEPT. 9391.000 NPHI.PS1 50.797 RTArR.PS1 6.857 TNRA.PS1 RCNT. PS1 1884.663 RCFT. PS1 274.510 CNTC. PS1 1948.093 CFTC. PSI GR.PS1 44.313 TENS.PSI 1370.000 4.029 1037.877 7.415 257.375 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION . O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUFIBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUM~ER: 2 DEPTH INCREMENT: 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 FILE SUf4~iARY VENDOR TOOL CODE START DEPTH CNTD 10216.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIt4~ LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GA~A RAY CNTD COMP. NEUTRON $ BORE~OLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TE~IPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL STOP DEPTH 9400.0 1 -JAN-97 CP42.2 1344 O1 -JAN-97 10201.0 10219.0 9400.0 10216.0 1800.0 NO TOOL NUMBER ........... CGRS-A 795 CNT-D 146 10328.0 SEA WATER TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 PAGE: 23 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC SONIC DATED 10-FEB-83. LOGGED WITH SANDSTONE MATRIX. PUMPED TOTAL 401 BBLS SEAWATER. THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 553714 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 553714 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 553714 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 553714 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 553714 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 553714 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 553714 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 553714 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 553714 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 553714 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 25 ** DATA ** DEPT. 10244.500 NPHI.PS2 21.295 RTNR.PS2 3.898 TNRA.PS2 RCNT. PS2 4334.511 RCFT. PS2 1111.896 CNTC. PS2 4452.550 CFTC. PS2 GR.PS2 32.125 TENS.PS2 905.000 DEPT. 9379.500 NPHI.PS2 49.137 RT1FR.PS2 7.200 TNRA.PS2 RCNT. PS2 1997.688 RCFT. PS2 277.136 CNTC. PS2 2051.499 CFTC. PS2 GR.PS2 38.438 TENS.PS2 1310.000 3.926 1093.478 7.225 274.405 ** END OF DATA ** · **** FILE TRAILER **** FILE NA~iE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE I g lIMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INC~: 0.5000 FILE SO?4~U~RY VENDOR TOOL CODE START DEPTH STOP DEPTH CNTD 10216.0 9400.0 $ LOG HEADER DATA DATE LOGGED: 1 -JAN- 97 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): CP42.2 1344 O1 -JAN-97 10201.0 10219.0 9400.0 10216.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNTD COMP. NEUTRON $ TOOL NUMBER CGRS-A 795 CNT-D 146 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 10328.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~PERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID L~VEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC SONIC DATED lO-FEB-83. LOGGED WITH SANDSTONE MATRIX. PUMPED TOTAL 401 BBLS SEAWATER. THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ PAGE: 26 LIS Tape Verification Listing Schlumberger Alaska Computing Center LIS FORMAT DATA 3-FEB-1997 08:35 PAGE: 27 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT 553714 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 553714 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 553714 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 553714 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS3 CPS 553714 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 553714 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 553714 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 553714 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 553714 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 553714 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 10244.500 NPHI.PS3 21.789 RTNR.PS3 3.965 TNRA.PS3 RCNT. PS3 4346.153 RCFT. PS3 1096.154 CNTC. PS3 4464.510 CFTC. PS3 GR.PS3 27.969 TENS.PS3 855.000 3.993 1077.996 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-FEB-1997 08:35 PAGE: 28 DEPT. 9387.000 NPHI.PS3 RCNT. PS3 1844.612 RCFT. PS3 GR.PS3 39.844 TENS. PS3 55.957 RTNR.PS3 240.000 CNTC.PS3 1325.000 7.667 1866.004 TNRA.PS3 CFTC. PS3 8.007 224.803 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE : 97/02/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE . 97/02/ 3 ORIGIN . FLIC TAPE NAME : 97024 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT · BP EXPLORATION, PRUDHOE BAY, H-20(42-16-11-13),API #50-029-20896-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE - 97/02/ 3 ORIGIN : FLIC REEL NAFIE : 97024 CONTINUATION # : PREVIOUS REEL : CO~4ENT : BP EXPLORATION, PRUDHOE BAY, H-20(42-16-11-13) ,API #50-029-20896-00 LIS TAPE: VERIFICATION I~ISTING Fp 010,H02 VERIFICATIOD~ LISTI, NG PAGE %TE :83/02/22 ~EI,,~ NAME :135242 ~,]NTINUATiON .~ ~01 l~ME~TS :LIBRARY TAPE TAPE HEADER ** {RVICE N A ~l~ : SE'~RV IC ~TE ;~3/02/~2 {IGiN :6801 ~PE NA~E : ~N~INUAIIDN ~ :01 ~EVIOUS TAPE ,)~MENI"S :LIBRARY TAPE ~ INFOR~iATtON RLC)RD8 ** U~IT TYPE CATE SIZE CODE N : ,,",30HI(] AbA,SKA PETROLEU~ 000 000 022 065 N : H-20 000 000 004 065 N : PF~UDHDE BAY 000 000 019_ 065 Olin: NORTH SLOPE 000 000 012 065 TAT: ALASKA 000 000 006 065 TRY: U,$.A, 000 000 006 065 ******************************************************************************* SCHLUMBERGER * IP O!O..a02 VERIFICATION LISTING PAGE 2 ALASKA COMPUTING CENTER ****************************************************************************** )MPANY : MO~,'~IO ALASKA PETROLEUM COMPANY ~LL = H-20 [ELD = PRUD}{OE BAY rATE = N[)NtBER AT ACC: 68013 DATE !,OGGED: 1 ~. FE",~.~ 83 %SING :: 9 6~5" SURFACE TO 9444' fPE FLUID = G~t, POLYMER IT SIZE 8 5" ,.~ ~ITY - ~B/G [SCOSITY = ~ 0 S ~ = 11,0 ~UID bOSS = 5.6 C3 RM RMF RMC R~ AT BHT 32 ta ~0 DF 32 ~ 60 DF 781 ~ 192 DF kTRiX SANDSTt)~ E ~* No'rE *** t)II~ AND FDN RUN IN CO~B/NATIQN AFTER .FIRST OIL FAILED. FIRST DIb AND FDC/CNL USED AS MAIN bO~. BECAUSE OF DEPTH DISCREPENCY. TOOL STUCK ON FIELD PR' ** , ******************************************* ************************ ** 'P OlO.H02 'VER.IFICA. TION LISTING PAGE * SCBbUMBERGER I.,OGM INCLUDED WI. TH THIS MAGN~TIC TAPE: * * * * , DUAL, .INDUCTION SPH~R. ICAC, L¥ FOCUSED LOG (DIL) BOR~,H,~L[t CO~. ENSATE, D LOG (BHC) FOR~ATIGN.~.DE;NSITY C(]~PENSATEO LOG (FDC) CG~P~2NsAT, ~D NEUTRON .[,OG (CML) GA~A RAY DATA F[.IR~AT RECO~D ** ITRY BLOCKS T'YPE SIZ~ PEPR CODE ENTRY 4 1 66 8 4 73 6O 9 4 65 ,lin fJ 1, 66 0 .~TUM SPECIFICATIDN BLOCKS ,,~E~,' SERVICE SERVICE UNIT APl AP1 APl AP1 FI.bE SIZE PROCESS SAMPhE REPR ID ORDER ~ LOG TYPE CLASS ~OD NO, LEVEL CODE ~PT FT 0 o 0 0 0 4 0 ~ 68 ~ h U D 15 [) H ~ ~ 7 0 0 0 0 4 0 1 68 ~,M DIL [.]H~ ~ 7 0 0 0 0 4 0 1 68 ~D DIL ()H~ 7 12 46 0 0 4 0 I 68 ~ D I b ~ V 7 1 0 0 0 4 0 1 68 R DIL GAPI 7 31 32 0 0 4 0 1 68 ;P OlO,H02 VERIFICATION I~IST,'ING PAGE 4 I 68 1 68 1 68 1 68 1 68 1 68 I 68 1 68 ! 68 I 68 DATA ~PT ~R A ZPT pPH! P PHI CNL NRA gPT P PHi NRA EPT P PHI NRA EPT P PHI oooo 9375 -9992500 -9992500 -9992500 103000000 137813 227051 9705000 2 1367 S F L 'U GR CAL, I GR DRH[J CAt,,/ 10~0 0000 SFLU 3:1875 GR. 26.2207 DRHD 462,0()00 CAbI 2,5293 10100 0000 SFLU -82~6875 GR 24 2676 DRHO 1496: 0000 CALl 2i 4785 10000.O000 SFLU -50,031,3 GR 26.2695 DRHU 1500,0000 Cgl, I 2,4648 9~000000 SFLU 76:1250 GR 13.9160 ORHO 3160.0000 CALI 1,7998 9-800i0000533125 GRSFLU 22 509~ DRHO -9992500 IbM -9992500 DT -g99 2500 RHOB -999 2500 GR 9,8281 IbM 51,7500 DT O,2163 RHOB 5,8711 GR 5,5625 I~M 48,9687 D 0,0073 RHOB 8,5O78 GR 22,2656 32,7500 DT 0,0352 RHOB 9,4766 GR 18.5781 II.,N 27,671.9 DT 0.0166 RHOB 8,46~8 GR 177188 27:7344 DT 0.0160 RHOB 8,7813 GR 14,9375 52.0000 DT 0.0103 -999,2500 -999,2500 -999.2500 -999.2500 8,5391 77.1875 2,2207 51,7500 2,7520 90,1875 2.3730 48,9687 11 5OOO 90:5625 2.2637 32.7500 12,1016 93,7500 2.2559 27.6719 10,5938 73,0000 2.4629 27,7344 12.3438 83,0000 2.4414 I bD G R NCNb MR, AT IbD GR NCNb NRAT ibD GR NCnb NRAT ILD GR NCnb NRAT lbD GR NCNb NRAT IbD GR NCNb NRAT I bD GR NCNb -999,2500 -999,2500 -999,2500 -999,2500 9,~875 75, 500 2074,0000 2.0801 2,6387 30.5156 3700,0000 2.4883 12.0391 23,4375 3708,0000 2'4375 17.0781 26.9687 3698.0000 2,4902 11.3359 24.1719 5688.0000 1.6904 13 3125 46:6875 3868.0000 rfp 0],0,H. 02 VER.IFICA~'ION bISTING PAGE 5 663,0000 2,3242 ~PT 9700 0000 S F"btl > -79..3125 GR ?MI 28,6133 DRHO 2NI',,, 1 320,0()00 CAI,,,I ~'RA 2,6797 PHI, 0000 2656 GR 1797 DRHO 5000 CAI,~I 216~ 9~00 59 ,0 .0 .3 000 SFLU 437 GR 469 DRHO 000 C A L, I 477 ~P~ 9 400 ? -999 ;HI -999 ~"Nb -999. '~RA -999 O0 25 25 25 00 GR 00 DRHO O0 CALI O0 ~PT 9386 ;~ -999 PHI -999 ~t¥ i,, -999 '~RA -999 0000 2500 250O 250O 2500 ORHO CALl 9219 GR 21 6875 II~ 34.b250 I')T 0,026~ RHOB 8,6328 GR 20,020187 ILM 156, O0 DT 0,1255 R~,~[)~ 9,9062 GR 15,9375 IbM 63,1562 DT 0,0044 RHOB 8,804'1 GR ~999,2500 Ib~ 999,2500 [)T -999,2500 RHOB -999,2500 GR -999,22,~00 -999. 00 PT 99.2500 Giq 52,0000 NRAT 23,4688 84.56~5 GR I472'1 NCNb 14 304'1 IbD 67:0000 GR 2,B945 NCNb 156,0000 NRAT 12,2187 92,3750 GR 2,2813 NCNb 63,1562 NRAT -999.2500 I.bD 126,~000 GR -999, 500 NCNb -999.2500 NRAT -999, ~500 IbD 126. 750 (;R -999,2500 NCNb -999. 2500 NR;IT 2,2773 35,~562 594 29'0000 353~'6582 , 14,5781 137,3750 3072,0000 3,0996 , O0 37 30,0 -999 2500 673' ,5000 -999,~500 -999,2500 -999,250( 890,0000 -999,2500-999,2500 * FILE TRAIBE¢ ** ILE NA~E ISERVIC,O01 ERVICE NA~E : ~RSION # ATE : ~XI~U~ [,KNGT~ : 1024 I[,E TYPE : EXT FIL,~ NA~E : * TAP[ TRAILER ** ERVICE NAME :SERVIC ATE RIGIN kPE NAME ONTINUATION # :01 EXT TbPE {gA~E : O~:~tS :t,I~aA~Y 'rAPE 'P OI.O,H02 VERIFICATION LISTING PAGE 6 REEL T;wAIt, Em ** ;RV'IC~: N.ANE :8ERVIC ~TE [IGIN : )NTINUATION ~ :01 ~XT ~EEL NAt~E : '}MMENT8 :LIB'RARY TAPE ********** EOF ********** EOF TAPE H~ADED ** ;~,RV ICr, NA MF., : SEI,~VIC )~TF_. :83/03/ll EOF l~RVlCg NIM~ IE~SION # : 4AXIMUM LENGTH TYPE ~* INfOrMATION RECORDS ~NE~ CONTF~TS rN ~ PRUDHO~ BAY' RANG: 13~ COUN{ ~ORTH SLOPE ** ~OMMENTS {..INIT TYPE CAT~ SIZE C~DE 000 000 026 065 000 000 004 065 000 000 01~ 065 000 OOO 003 065 OO0 000 004 065 000 000 002 065 0OO O00 01~ 065 000 000 006 065 O00 000 006 065 tVP 010,H02 VERIFICATION LISTING PAGE : SCHI,U~BER~£R * : ALASKA COMPUTIN~ CENTER * ******************************************************************************* ;TATF = .R[,~SK~ LOGGED: 10 FE~ 83 ~YP~ FLUID = G~L POLYMER ~T SIZE = 8.~" )ENSITY m 9 ~ ~ISCOSITY = 3~,0 S ~ = 11,0 ~5U~D LOSS ~ 5.6 C3 RM ~~.~40 ~ 60 DF ******************************************************************************** DATA FORMAT RECORD ~NT~Y BLOCKS TYP~ SIZE REPR CODE ENTRY 4 1 66 ~ 4 73 60 9 4 65 ,1I~ VP O10.M02 VERIFICATIOM LISTING PAGE SPECIFICATION BLOCKS SFDVICE SERVICE UMIT AP! TO OPDER # LOG CNh GAPI APl 0 0 , DATA ** ,EP? q500.O000 ~EPT 9400.0000 ~ q3oo.o000 ~EPm 9100,0000 ~EPT 9000.0000 }EPT ogO0.O000 ~EPT S~O0.O000 )EPT 0700.0000 )EPT ~500,0000 )~PT ~400.0000 )FPT ~100.0000 )~Pm ~000,0000 )FPT ~9oo'.nOOO )~PT 7~00.0000 )EPT ??00.0000 )~P? ?600*n000 ~EPm 7500,0000 50,2813 61.5625 ?q2,0000 502,0000 5n!.'.7500 46~7500 509.0000 517'5000 51~,2500 505,5OOO 456.5000 454.2500 466',5000 4t5'5000 3~,0000 o sooo 2o?'2500 309,7500 321.5000 366,0000 66 AP1 FILE 0 0 4 0 0 4 P~OCES$ I.,~VEL 0 0 1 COD~ 68 68 VP O!O'.W09 V~RIFICAIlO~ LIS?I~ P~G~ 4 EP? ?400.0000 EP? 7~00',0000 ~P? 7200'.0000 EP? ~100,0000 ~T ?000.0000 ,FP~ 6900,0000 ,~PT 6~00'.0000 ~EPT 6700.0000 }EPT 6600.0000 )EPT 6500.0000 }EPT 6400.0000 )~P? 6~00'.0000 )EP? 6200.0000 )EPT 6100.0000 )EP~ 6000.0000 )EPT 5900.0000 )EPT 5800.0000 )EP? 5700,0000 )EPT 5600.0000 )EPT 5500.0000 )EPT 5400.0000 DEPT 5300.0000 DEPT 5200.0000 DEPT 5100,0000 ~gPT 5000.0000 D~PT 4900,0000 O~PT 4~00.0000 317,;:000 438.0000 4}4.0000 4~2.5000 374.5000 275.0000 336.5000 3~3,5000 , 361.7500 o.sooo 309.0000 279,2500 ~73',0000 ~86,5000 484.0000 465,0000 550o5000 508.5000 376,5000 49.21:~7 59,5938 39.3750 31,.9844 45,~437 ,VP 010,H02 VERIFICATION LISTING PAGE 5 ~EPT a?00,0000 ~R )EPT ~600,0000 G~ ~EPT 4500,0000 ~ )EPT ~400,0000 GR ~MPT 4300,0000 GR )~P~ 4~00,0000 GR )EP? 4100,0000 GR )~PT 4000,0000 G~ )~PT 3900,0000 GR )MPT 3~00,0000 GR )EPT 3700,0000 GR )~PT ~600.0000 GR )EPT 3500,0000 GR )EPT 3400,0000 GR )EPT 3300,0000 UR )EPT 3200,0000 G~ 3EPT 3100,0000 G~ )EPT 3000,0000 G~ )EPT 2900.0000 GR )EPT 2800,0000 ~R 3EPT 2700,O000 ~R 3EPT 2600,0000 OR DEPT 2589,0000 G~ SERVICE NAME V~RSION ~ D.~T~ ~ NAXINL,IN LENGTH : 1024 ~!.b~, TYPE 47,2500 63.7813 ~5,0625 26,8201 23,2031 22,9844 53,5938 46,4063 26,0625 55.8750 ~7.4375 ]5,8t25 38,3125 38,7500 44,1250 51,6075 47.0000 56,5625 39,7188 34,7~13 26,87~0 2~',7~13 VP OlO,HO~ VFRIF~C2T~ON LISTING P~GE ~ ********** EOF ********** ********** FOF ********** $ ~q~ FIELD NAME : PRUDN(.')E BAY ~QROUGH : ~,~ORTH SLOP~i STATE : AL,ASKh FE;FER~,:NCE Nfl : 74576 Center 23-'~.': A Y - !. 991 20:59 FAt, ~=20 (42-16-11-13) ...... riolO,-2Cl'?OSgfi'O0 bAY,h-20 (4,2,,,,I. 6,,,,11-13),50-029-20896'o0 PAGE: IS mare wer'if, icat..i, on Listino chl. t~m~'eraer AlaSKa Comptlt.i~q Center 23-",; AY = 1. 9q ! 2¢::5Q PAGE: i)F: 7c~. 2 7'P, DPTL[,F:P: 1 !)24 7 CA$T~G 2: TU~IN~ 4: 5t~" a7 L.P, ~a F',F;IL, LEtl ,r),EPTH OF 0 ?~ [,B ~ D~,ILI,.U.I~ DF:P~"}.~ OF 9224 TO 1t?" 17 [,g ¢ PRII,I, ER UFPTP OF 0 mr) q156 112" 12,6 t,P ~' ~.R!L!ER DEPTH OF 9156 TO 9281. 1..,mGGING [)IST~ICT: wT'T~E$8: TF'~OL F.~U~BER$: C, ~:11 C}4 E!'. ATC EB 482 tt:IED TNTO ebb OF' 2-1.3-.n. 3, PI.I~?;PI.~,: REOI..~TRE[5 TO COVER I...,tJG It,.'TERVAI~ wITH PAS8 ~J, STI. bb ~2~COLiF~TERED GAS AT' 9502 AND wAS !.ISED I~',,~ Ti..iE'. t')V~;R[..,IY OR ~'¥ERAGE, PA. SSE8 2-5 I.JSFD, 2 1/2" C~':~I, ~:~SEO F"OF~ hDC: USING 5~NDSTONE iqATRIX. JOB ,,qT~RTED: REFER~]NCE ~.iO: 78,576 ******************************************************************************* FILE 50-029-20~ 96-00 IS ~'ace verification C~,lU,',~erc!~r ~laska Com,~.,ut. inc~ Cea, t-.er 23-~.'~/-~Y-!gqJ 20:S9 p n ,S ,q PISS (AVEr:,n, GE[) }'iPHI) TAb!.E '?YPlK.. : Ct)t,:8 C~'.. [~P EXP A~ ONI'.~O~ I Comoa~V Name T 0 W STAT $~,~' p~T E P t) I.,N F TD [> TD L FT FT FT FT FT ~T CP C. ~'!I C H 422616 7~.2 45. 1024.1.. 10238, 9395. Xel. 1 hame API Serial aumber Fiel~ Location Sect ion Tr'~wn, s n i ~:> Cot)htr St, ate or Province Nat ion b a t i t u d e L o n q i t u d e ~'.' i. t ne s s ' [',tame.. Service Or,er Number Permanent. F, levat, ton I.,oc ~.~easured From ABDVE PERMAN~!T [Clevation Elevation of i:')er'rick Elevation of Ground L Tot, al Depth - brlller Total Deot. h - bog(~er Bottom l.,oq Interval Top Log Interval Pri!,linr] Fluid Type Drillinc K].uid Oensit ZOo]I.: :Drillinq F1L1J. d Ph ZONE Dri].liDq Fluid Viscos ZO'aK IS 7a~e veri!.i, catlor~ [,i. stit~q chlur0berqer )\].ask,.~ Con',ptltinn Center' PAGE: 4 TU:i I v ~ l,i_i L)EFI TYPE ¢~L F3 ~lllno u d LOss Z R~S n~,.~ Res.ist~vitv of ~ud Sa ZO~-:,E ~'$I' D~f;F ~-~.~ Samp].e Temoeratur ZO~E ~F'ST DEGF ~iud Filtrate Sample T R"CS GM~ ResJstiv~tv of ~,.~d Ca MCSw PEGF ~u~t CaKe Sample Tempe STEu DECS' -qqO.P5 Surface Temperature BPT DF',GF 2gl. Sottom i~ole TemDeratt] DFPT RC r,.i'r RCFT C'~'r C CF'TC CC!, RCFT CFTC GW CC~ N P H T Depth Channel t~ e't] t r on Pores Raw Thermal Ne~3tron Par'lo Calibrated Thern'~al ?..taut. rea Rat;lo RC?T CNTC C~,rC Tension CCI. A.~p 1 ~.t tide Neutron Po~ os.itv Paw T~erm81 ~,~eut. ron Ratio C~llbrated Thermal ~,,eut..l"ort R. atJ. o RC~.~'T Tension CCI, a,~p,lit, ude ~i'eutron Porositv Paw ~ne.,~"~a], ~:~etlt'.r:o~ kat]i.o .,IS Tane V~rificat. J. on PAGE: RCF? ~rl..~ t,!PH RCFT COL RTP~R C~TC C ~ T CCI, ~CFT C ;¢ 'r C CFTC ~emS CC L Cal ._.rate':, 'r m 1 I'.'eu ron Pat. lO ion ton Porosity q'l~er,,s]. ~eutron hrate~ 'i'hermal Patio i'~¢utron Ratio ~C~T C,'iTC CFTC .r,a m c;a Ray Tenslon CCI., amplitude ~!eut. ron Porosity ~aw T~erma]. Neutron ~at:io Calfbr. ate~J ~rbermal. ~eut. ren ~at~o ~C~X~T (?~q ~C CFTC Tension +*Jeutron Porosity S P E C I F I C.A T ! 0 ~',:~ r~ E C [J P !'> * * ;ChlUmherner .AlasKa ComPtlt:ir, r~ Center 23--~c~ ~ Y-.1 q91,, '20 ~ 59 m ~ m~mmmm m~m~ m mm m mm ~m~m ~m mm N;~ F.,.RV l.! "~ S PVTC~ .PT hP D~P* Fg' ? NPHT P$1. PU 427616 O0 O()C'. O0 R m ;",; PPSt 4226~.6 ~'~R ~ PS1 a2261A O0 F',C~T PS1 CPS 4226~6 RCFT P~. Ct)S 4.226!, ~ O0 000 O0 C~.~TP PS1 CPS ~226~6 Of) 000 O0 CFTC PS1 CPS 422(,10 O0 GP PSl G.~PI 4-22~.16 O0 000 O0 '.r F ~:~ 8 PS1 [,g 42261b oO OOC, 00 C C I.., P $1 v' a. 22 ~ ! 6 00 00 o 00 NDNT PS? PU 422616 O0 00(} (,0 BT;~I~ PS2 4.22616 O0 000 O0 T~:~R h PS2 422~16 R C 1~.~ TPS2 CPS 422616 O0 000 O0 RCF~ PS2 CPS 422~16 00 0o0 00 C~TC PS2 CPS q22616 00 000 00 C F"!'C PS2 CPS 422616 O0 0o0 O0 GR PS2 (';~PI 42201~ O0 O(,n O0 TE~S PS? l...q a. 2261 6 00 C C1'.., P82 V 422616 NPH] PS3 PU 422616 00 000 O0 RT~X:P PS3 422616 00 OOC'. T ~.: P,~ PS3 4,2261 f~ O0 000 O0 ~ ~ -,, ,~, R C,,,. ~ 'P $ 3 C P $ 422616 (.,, *:.") 000 00 RCF~' PS3 CPS 422616 CNTC PS3 CPS 422616 O0 000 0O CFTC PS3 CPS 42~b!.b O0 000 O0 G~ PS3 GAPI' 4,22616 O0 oo0 O0 .. P,. 3 [.., ~'~ ~ 2261. ~ 00 000 0 CCI, PS3 V 4.22616 O0 000 O0 NPH'[ P"4 .... O0 .'c,, PI~ ~:22616 o RTNP P~4 422616 O0 0(:;0 O0 T~',,~ PS4 422616 ,)0 (~00 O0 RCN~' PS4, CPS 422e 1,6 O0 000 O0 FeF¢' PS4 CPS 47261t3 O0 00() O0 Ct~TC P84 CP,$ 422616 CFTC PS4 CPS ~22616 00 0('~0 00 GP PS4. (;.~PI ~.226~6 O0 O00 00 TFcqs PS4 LB 4.2~61e 00 0(;f) O0 CCL PS4. V 422616 O0 o00 O0 NPHT PS5 P!! 422616 O0 OC'O O0 ,. NUv{R Z. R PR PROCESS MP El, E!; COnE (HE×) .... l ....; .... 4 6R 0000000000 4. 6~ 0000000000 4 68 000(;000000 4. 68 noooooooo0 4. 6t~ 0000000000 4. 68 O000000OO0 4 68 0000000000 4 6~ 0000000000 ,-9 68 0000000000 4 68 0000000000 4, 68 0000000000 4 6 .f-s. 00000OO000 4 62 0000000000 4 68 O0000000OO 4 62 0000000000 4 §8 0000000000 4; 68 0000000000 4. 68 0000000000 4 68 O00000OO00 4 68 00000()0000 4 b8 0000000000 ,4 68 0000000000 4 68 0000000000 4 68 0000000000 4: 68 0000000000 4 62 0000000000 4: 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0o00000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4, 68 0000000000 4. 68 000000o000 4 {~ ~ 0 (:) 0 t) (,~ 00000 4 68 0000000000 4. 68 000000o000 4.. b 8 000 o 0 r) 0000 4 68 0o00000000 IS 'rape Yeriftcat.i.c)m l.istJn.o Ch].,.~mbernor Alasks Co,~t~.ltino cenr~'r ........ ....... : ........ RTr.~ PS . 2~£-,16 AP1 T TYPF: CLASS i~t:D ~L~G SA~',,P EF,K:,e COD~ (H~X) T~':R ~ PS5 422616 C.n R C ,~ 'f' PS5 CPS 4226!t RCF~ .PS5 CPS 4.22L~6, C'N"I''C PSR CPS ~n~6J (, CWTC PS5 CP$ 42261. r, ".~0 GP PS5 GAPT 422616 TFhlA P~5 [.,R 4226).~ CCi, PS5 v 422e,~ 6 O0 i i i . i Itl ii~ I i i iiii ii I m . Iii ~ I il 0 (;, 0 f'~ 0 0 i _! 1 4 6 n 0000000000 I~(;O 06 (': I 1 .!. 4 f.,,~ 000000~000 no0 O0 t) ! 1 .1. 4 68 0000000000 0 (., (', 1, 0 t.~ 1 :1. I 4 68 0 0 0 u 000 0 C, 0 nr.~O O0 (' I 1 1 4 6~ O000OO000n 0c, O O0 (: I 1. ~ 4 68 0000000000 oC, O O0 ~., I ! 1 4 6~ 0000000000 o (:, 0 u 0 :,) I 1 i 4 68 00000 O 0000 OOo 00 u :~ 1 .! 4 68 O000000C, O0 PAGE: ** [.)AT~ ** DKPT. RCx;7.P81 -999.250 GP.P$1 -999.25(> RTigP.PS2 -9q9,250 C~'TC.PS2 -90g.25~t CCL.PS2 -999.250 RCNT.PS] -999.250 GD.PS3 -999.~50 P~NP,DS4 CNTC.PS4, 3203.a41, CC1,,,P'$4 RC~',PS5 -999,250 G~,PS5 -999.250 DFPT. ! 0200. 000 R ¢ l','t T. PS 1 2.., [333.333 G., PS1 27 594 R~f,~ P52 4 706 C'NTC, P52 CCI,,. PS2 0 RCNT. PS3 2852.174 GP, PS3 23,250 R'r~x~P,PS4 5. 000 C~TC. PS4 2~'~80,254 C C f... P S 4 0. RCN'f, PS5 2776.573 GP.PS5 23.391 DJ:PT. 1010o. OOt~ RcN'r. P$~l. 2672.451 ~r.:,. PS1 22.219 RT'NP, P82 5. 655 Ct,~TC. PS2 27 !. I,. 584 CCI,. P82 o, 0O0 R C ~",t'f. ~S,] 274 !. 965 hIPHI:.PS1 -999.250 RTNR. P,.$ l. -990.250 R CI~'")?. pS 3 -a99.250 C'¢: .q.'C, PS :1 -999.250 CF.'I,C. PS l - ... 250 CCL,PS1 -999 250 ~Pt4I PS2 T [¢i i:,i o. [:~ S 1, '999. .... . T f'~P A,. t.,S2 -999.250 RCNT,PS2 -999.250 RCFT.PS2 CFTC.PS2 -99q.250 GR,PS2 -999.250 TF:NS.PS2 NPHi.PS3 -999.250 RTNR,PS3 -999.250 TF.~RA. PS3 ~CFT.PS3 -999.250 Ch~TC.PS3 -999.250 CFTC,PS3 TS:~,]S. PS 3 -999.~50 CCL,PS3 -999.250 NPDI.PS4 TNRA.PS% 4.548 !~CNT,PS4 3049.505 RCFT.PS4 CFTC.PS4 704.486 G'R.PS4 26.891 TENS.PS4 ~PHI.PS5 -999,250 R'TNR, PS5 -999.250 RCFT.PS5 -999.250 CI'iTC. PS5 -999.250 CFTC,PS5 T[~NS. PS5 -999,250 CCL.PS5 -999.250 NPHI.HLA NPHI.PS1 30,735 RTNR,PS! 4.667 TNPA.PSI, RCF'T,PSI, 6J. 0,687 CFTC,PS1 3006,340 CFTC.PS1. TENS.PS1 1425,000 CCI,,, PSI 0.000 NPH!.PS~ T?,?RA. PS2 4.764 :RCNT,PS2 281!.280 RCFT.PS2 CFTC,PS2 629.577 GR.PS2 21,641 TE~,~$, PS2 ~,,~Pk{ I. PS 3 31 .B74 RTNR.PS3 4.97() TNRA.PS3 RCFT.PS3 572.668 CtITC. PS3 2992.201 CF'TC.PS3 'F fi: N $, P 83 144. 0,000 C C'L, P S 3 0.000 N P ~ l. P 84 TNR, A.PS4 5.173 fRCNT,PS4 28:11.280 RCFT.PS4 CFTC.PS4 5~4.149 GR.PS4 22.609 TE~,~$.PS4 !',J PH'I, PS5 28.622 RTNR,PS5 4.457 TNRA.PS5 ~CFT.PS5 595.74;5 CfvTC, PS5 2874.64l CF'I:'C. PS5 T .E N $. P $ 5 ! 525,0 u 0 C C I..,. P $ 5 0,000 ~;~ P H I, ).,,i b I ~,!PHI.PSI 33.857 R.TNF{, PSI 6.154 TNRA.P8! RCFT.PS1 451.193 0~";7"C, PS 1 2759.107 CFTC.PSi · ',' 000 ..... C.I.,.PS1 o nO0 NPHI PS2 TE'NS, F, S1 1. 430, ...... . .... 'Tj~ A. F"$ 2 5,785 RCNT,PS2 2568.330 RCFT.PS2 CFTC.FS2 496,525 GR,PS2 22,641 [!'gt~lS. PS2 N'PHI. PS3 32,9'!7 RTNR,PS3 5.926 T~,~R A,. PS3 RCFT.PS3 468'547 C~.{TC, PS3 2787.334 CFTC.PS] TENS.PS3 1445.000 CC( PS3 0.000 f,!P}41. PS4 -999.250 -999.250 -999,250 -999.~50 -999.250 -999.250 -999,250 26.010 693,069 780.000 2999,250 999,,250 26,010 5.1,33 588,725 27.7J9 591 304 !425 000 5 269 570 766 31 067 577 495 1500,000 4.876 601,682 29,821 5.502 529.189 36,327 493,617 1360.000 5.392 541,358 34,893 ,IS ~ar.,e verifi, catioD ch, 1, tl~,t'e rqer Alaska RT,',,D. PS 4. 5.333 Ti~F'A, F'S4 C,~,:TC. PS4 2764.80'! CCI .PS4 {). ~."{)(', GP.PSB 20.b17 TE~,;S. PS5 DFP~. 1 n00~3. ('~00 G~.PS1 22.!R~ TE~S.PSI RT ~,: ~. P82 4. ~ 3 a C~,~TC.PS2 3913,~19 CFTC,PS2 CCL, PS~ a, r~0~'~ ~'~PHI. PS3 RC~,~. PS 3 3713. ~66 RCFT. PS3 GP.PS3 20.~75 RT~:~. PS4 4.80t, T~,~PA. ['$4 CNTC.PSa 3938,71 $ CFTC. PS,i CCI . PS4, 0'~Yl; (% {J t'YPH I. PS5 RC~JT PS~ 3710,~a R~FT PS5 GP.PS5 22.35Q D F: p T. 990 (). 000 ~,i p H I,. P S 1 R C ~":~ *. P $. 1, 5530. .,,. '~ ~ 5 '~ C F T. F' $1 (;¢ PS1 14 008 T~ PS! RT~,P.PS2 3,046 C~,<TC. PS2 5777.1'1~ CFTC.PS2 CC[,.PS2 ~. 0'0(,~ rqPHI:.PS3 RCi'<~'.Po3~' 57~2.7c~),> RCFT.PS3, GP.PS3 13.398 TgNS.. PS3 ~ W r',,~ P.P.,S4 2.9o 1, ',[' ::q ~ A. PS4 CN~"C PS4 ~8'21.('~.'07 CFTC PS4 .... m ..,,J , . CCL. PS4 0. OO() t . ,,. . F RC'r,,'r PsS 5518,4,38 ~C,,7 PS5 GO. PS5 ~. 5.313 TEk, S. PS5 D g [,, T. 9800.00 ~) RCN* PS1 ~060,737 PCF® PS1, , · , .... '. ,~. · . (;~. PS1 2~.025 TE~S PSI .......... ~,,, · ~ R T ~ P. p $ 2 4.068 T ,,i R A, P S 2 C~,!TC. PS2 a378.939 CFTC. r's2 ,C[~ PS2 0.000 ~'P~I PS3 RC~.,;T.Fo3 4119 !48 RCF~. ~ . G~.PS3 32.250 TE,;N ~ 'PS3 ., ~,,> e · R T N ~, P S ,4 4,. 2 q 1 T N R A, P S 4 CNTC PS4 4220 [~5(') C..~C, PS4, CCI,. pS4 0, ()00 NPHI. PS5 RCN*. PS5 ,4060.73'7 RCF'T. FS5 Gl"', '>e" , T (;' [) F P T. 970 C,, 00 [',! P H 'I'. P S 1 (.;P P81 2o 250 RT[,,~R. PS2 3.771, T~'~RA.PS2 CNTC P,S2 4,,780,249 CF. R C ~'.,i q' . P $ 3 4 q: 24 , ], 16 23-,',!aY.-199! 20:5c) 5.622 RCD~T.P$4 52C.044 32.7°6 RTNR.P85 · ~85.9o(: C~:TC.PS5 1450,000 CCh,PS5 27.1 a3 ~TNR,PS1 798,265 CNTC.?S1 1430.000 CCL.PSI 4.76~ PCMT.[>S2 811..412 aP, PS2 8 b 2. !. 'I ,i C r,~ 'l: C. :P 53 ].410,C~UO CCh,PS3 4.973 ~CN~..PS4 778.516 GP., PS4 2~ .5~9 ..,t . 7,46.204 CNTC.PS5 1455.0U0 CCh. PS5 1 S. 474 ~TMa. PS 1, a 02°.203 C'~'rc PS1 1420.000 CCI.,. PS1 3,1 l? ~cN'r,PS2 1037.7 i 0 15,6t~4 RT~,;R. PS3 1430.000 CCB.PS3 3,159 ~C~T, PS4 1927,458 GR.PS4 ',t 4,. 68 ~ R T h R, PS 5 2047 7' CNTC P85 . 22 1430,000 CCh,PS5 23,939 RTkR,DS1 1028. ~'25 C N'I"~ PS1 1425.000 4,,354 RC~:T,P82 1024.847 <;R, PS2 23.842 RTt';a. PS3 991.150 C[1TC, PS3 1400.000 CC t'.,~. P83 4.421. RCNT,PS4 994.418 GR, PS4 23,546 RTii'R,, P85 104:1 .215 Ct~TC,PS5 1.450. 000 CCh, PS5 20.969 RT~,~R. PS1 1232.104 1410,000 COb,P81 3,681 RC~',{T. P82 1294.576 I 9.0o0 RT~:~R. Pe 3 . .,, . , 1259.5'74 C?.!TC. P83 2723.404 19.328 5.714 27~6.309 0.000 4.4'78 3820.293 0.0(:0 367~.959 22.203 4.204 3863.842 0. 000 3744.681 1.~.641 4.791. 3883.157 0.000 3.101 5854.16.~ 0 . 000 54,,49.O2] 11.56~ 3.290 6060.502 O. 000 54:80.851 1.6.~!.3 2.966 59].1,. 504 0.000 4.069 4329.4,1,2 0.000 ,4208,695 28.01,6 4.214 431,5 ,366 o: ooo 4026.030 32.875 3.933 4~54.2.02 0,000 3.690 4,.713.313 0. n 00 4452. :i74 15.8:,t6 3.568 4804. :1,20 RC~'P. P$4 q' E,x, S. P$4 TLRA.PS5 CFq'C.P$5 ?iPFiI. H b~ Tr,.'RA . PS l Cr'!'C. PS 1 ,xaPH~. PS2 RCFT.PS2 TE',,uS. PS2 TNRA.PS3 CFTC.PS] NPHI .PS4 ReFT.PS4 TEN8. PS4 TNRA,PS5 CFTC,PS5 NPHI , HLA T~RA. PS1, NPHI .PS2 ¢CFT. PS2 TNRA.P8] CFTC.PS3 NPHI, PS4 RCFT. PS4 TEllS, PS4 TNRA, PS5 CFTC.PS5 N P H I. H b A 'I.'NRA.PS1 CFTC. PS 1 N'PH I . P82 RCFT.PS2 TENS, PS2 TNR. A,PS3 CFTC,PS3 a P N I, ,, P S 4 RCFT,PS4 TENS. 984 TNRA, PS5 CFTC, P85 N P H I. }! b A TNRA .PS1 C~TC. PS 1 NPHI, PS2 RCFT,PS2 TNRA .PS3 CFTC, PS3 PAGE: 520,607 1440.000 5 375 547:276 34.225 4,696 811.882 27.876 815.618 1415,000 4.480 847,]30 29.419 764,33~ ~435 000 4~869 794.260 28.049 3,142 1961.834 1,5.259 119~,540 1i9 :ooo 3.1,67 2001,865 ~5,603 ~960,954 000i4] 2065,430 1'5'345 4.280 !030,675 24,507 1.023,861. 1390.000 4 267 1034~559 25.024 956.522 1420.000 4,228 1.040,,751 24,230 3.884 1228.873 19,469 1214,750 1395,000 3,751 1260.308 ~l.q.. Tape' Vertficati. on ~,ist. inm ~chlumhe.roer alaska Computino Center p'r ;',i P,. P S,-I. ':f. '273 T ;,! F~ f~. PS 4 C,"~TC. PS4 4679.62'-) CFTC. F'S~ C C l;. P 54 ,.1. ~., 00 ,~! P [; !. ,r.: S 5 ¢C>~'. p-Sh 4450. I nS ~CFT. PR5 C¢. PS5 1 ~q, I. 25 'rF.,c'S. PSfi pC~]?.PS~ 2245.987 RCFT.FS1 GP.DS~ 68.250 TE~,~S. PS1 C,,~TC. PS2 2931 ..469 CFTC.PS2 CCI,. PS~ '). o0O ~',~P[~ [, PS3 PC~,T. PS 3 ?'.~ ~ 't. 333 R CF"r. PS 3 (]¢.PS3 72.609 CNTC.PS4 2q!_4.5C1 CFTC.PS4 CCI,. PSa 0. 000 NPH l. PS5 ¢Ct, T.PS5 2B45.9~7 ~CFT.PS5 (;P,PS5 7~.500 TE~$.PS5 2 3-~.,~.~.~ Y- 1 9g I 20;59 35.321 ~TN~.PS1 485.900 C~,ITC. }'S I 1365.0OO CCL,['S1 5./~45 RCNT,PS2 503,345 G~.PS2 37,642 RIN~. PS3 4~9,565 C~:TC. PS3 390.000 CCL.PS3 5. 594 RCNT. PS.4 q21,242 GR,PS4 36,1, b9 RTNq.PS5 abs,go0 C¢~TC,PS5 ~420.000 CCL,PS5 0.000 4477.224 21.q22 3.520 4785.271 0.000 5.643 2953.705 0.000 2~80.694 79.1.25 5.926 3036.898 0.o00 2741.865 87.625 5.786 2929.409 0.000 DFPm. o500. i) 00 NPH'[. ["S 1 10. ~, 24 RTNR, [.'S 1 2. 369 R('NT,PS~ 9891.54.1, RCFT.PS1 4()q3. 384 CiqTC.PSI, 10359.658 (;P.PS1 4~). 4'3~] T~NS. r'$ ! !4qO.000 CCI.,. PS1 0.000 RTbP.PS~ 3.420 T~',;R a. PS2 3.527 ~CNT.PS2 4119.!48 C~,:Tc.PS2 4335.501 CFTC.PS2 1226.589 GR.PS2 37.219 CCr,. PS2 0.00O NPHI .PS3 18.695 PTNR.PS3 3.545 RC~x~q', PS ] 4164, ~ 5~', RCFT.PS3 !145.336 CNTC,PS3 4351.514 GR.PS3 a5.031 TEf,~$, PS3 1355.000 CCL.PS3 0.000 I:~T~.~P. PS 4 3,~41 T{>~RA.PS4 3,529 RC:N']:. PS4 4130.151 N~:'C.ps4 4309.748 C~C.PSa 1~23.9i3 G~ PS4 42 031 CCCL.PS4 0.0o() ~PH.I,PS5 18.,497 CTN'R.PS5 3.449 RC¢.~T. PS5 4130.151 RCFT.PS5 1174'468 Ci~.ITC, PS5 4311.663 GP,PS5 38.719 TENS.PS5 1395,000 CCh,PS5 0.000 !.',) F p T. 9400.000 ~,I p M I. P $1 RC,~T. PS ! 6421,286 RCFT. PSI. ('; P P S 1, :38. ~, 50 T E ?,.J $, P $1. Cu'rC.PS2 1924.320 CFTC.PS2 CCI,,PS2 ().000 NP~I.PS3 RCYW.PS3 18~3.4.78 RCFT,PS3 GP.PS3 46. 250 TENS. P83 RT ~,lP. PS 4: 7.57l Ti';RP,. PS4 CNTC.PS4 20!.0.21,4 CFTC.PS4 C C I,,. p $ 4 0.000 i'.~ P M I, P S 5 RCNT.PS5 1.9R6,606 RCFT.PS5 G~.PS5 4~.656 TENS.PS5 17.98,4 RTNR,PS1 1,839,479 Cf,iTC.PS1 4, :l 5. o 00 C C [,. P $1 7,633 RCNT.PS2 256,359 GR, P$2 52,930 ~T~. PS3 ~B8,747 Ct~TC, PS 3 350. 000 CCL.PS3 7.554 RCNT,PS4 264 5~7 GR,PS,4 57:606 R~N'R,PS5 247.7e}8 C~'.~TC, PS5 370.000 C C .b. P S 5 3.52~ 6783.057 0.000 1,,.880.266 46. 000 6.353 1944.537 0. 000 19.43,601 50.1,88 7.571,. 1999.0O7 0.000 D 1~ D ? o 3 q ,,'it,. ('> 00 ~ P lq I. ~"' $1 - o e g ,'~ 5 (') R T N R:. [.' S 1 . o 99.250 .... , ~. ~ .,, . ..... ~' .. ~ .¢, .' ." . RCf,,;T. PS 1 -999,250 RCFT.F'S1 -999,250 C~ITC.PSI, -999,250 GP PS1. -99c,,25(') Tf~:~:S,PS1 -999.250 CCL,,')K1 -999 250 R T N ~. P S, 2 g, 462 T ~,~ R ?~,. P S 2 7.906 R C N T, 'F' S 2 1. 915.743 ...... ' . , t, o2 47 !88 C [~q~c.pS2 po?3.gl~ C, FTC PS2 252,477 GR,, ~ . CCL.PS2 0,~.~00 ~,;PH l'.. PS 3 -999.250 RTNR.PS3 -99g.250 NPFtT.PS4 RCFT.PS4 TEaS.PS4 CFTC.PS5 NPhI.BLA TNPA.PS~ CFTC.PS1 NP~{I.PS2 RCF~.PS2 TFf~'S.PS2 TNRA,PS3 CFTC,PS3 NPHI.PS4 RCFT.PS4 TE~$.PS4 TNRA,PS5 CFTC.PS5 NPHI.lqL~. T~tRA,PS1 CFTC.PS1 NPHI.PS2 RCFT.PS2 TESS,PS2 T~RA.PS3 CFTC,PS3 MPHI,PS4 RCFT,PS4 TENS.PS4 T'NRA,PS5 CFTC,PS5 NPHI.HLA TNRA. PS ,1!, CFTC,PS1 ~,~ P~41 .PS2 RCFT.P82 Tr,~RA :PS3 CF',!,'C. PS3 RCFT.PS4 TENS, PS4 TNRA.PS5 CFTC.PS5 ~t p h I, H L A CFTC.'P$! NPHI,PS2 RCFT.PS2 TENS.PS~ T~RA,PS3 P AGE: 1,9.338 1.330.226 1435.000 3.700 1304.557 19.570 5.671 521.503 36.858 520,607 1385.000 5.933 501,306 34,655 555,314 1435.000 5,767 508.091 36,341 2,410 4033,597 18319 11972397 1350o000 3,577 1217.163 1.8.337 1,182,609 1.420.000 3,,551 1209.395 18,457 3.481 1968 053 52~695 260.304 1355 000 7 660 256 812 52 O05 248 337 1.400,000 @,195 250,522 52,871 -999.250 -999,250 55.081 230,599 ~.340.000 -999.250 ,Cl~l,l]mbercer ~I]~SK~ Comptlt. j~n,q Center 23-'", i* ¥'- 19~ ! 2¢):59 PAGE: 10 R("i,:'r. PS 3 -999. 250 r~ C. r'"j'. R Ttx~ P. PS4 -999. 250 W,,!R A C~,~TC. PS4 -99g. 250 CFTC CC~,. PS4 -999. ~50 1"7 P H I RCc.2~. PS5 -999. 250 ~CFT C;~. PS5 -909.25L) rE.'~S -999.2%0 C~lq'C. PS3 -999.25() CC.b.P$3 -999.250 -g99. ?50 GR. PS4 -Q99.~50 l~Tbi,q. PS5 -99o.250 -999. 250 COb. -99Q.250 CFTC.PS3 -999.250 aPitI.PS4 -999.250 RCFT.PS4 -999.250 TENS.PS4 -999.25o TNRA.PS5 -999.250 CFTC.PS5 -999.250 NPhlo~L,A -999.250 -999.250 -999.250 -999.250 -999o250 -999.250 55,081 **** F'! I,E 7'~A i!,E¢ **** FILF ~,iA['.'E : EDI'[ .nO1 8~RV,TC~: : V~RSIO53 : 00] AO.6 D~'T~' : Cil 'M~X F~FiC 5Tg[,i : 1024 FI.i_,F TYPE : LO I., a S~' F.I [, E', : **** T,aPE TRA! [,F,~ SERVICE ~\!A?~E : EDIT I).a..tE : 91/05/23 OPlCI~,: T~PV ?qAt4g : 7~57~ CONTI. NUAT~ON ~ PPE/V IOUS TAPE C 0 ~1 ~ E:.~'. '1' : (42-16-1. J-13) . 50-029-20896-00 i~,AY , (4:2-1.6-t 1.- ! 3.) , 50-029-20896-00