Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout183-092 • S
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 t
93
-I-
RFCEIVED
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission JAN 201
333 West 7 Avenue
Anchorage, Alaska 995011= �'��
. Commission
Subject: Corrosion Inhibitor Treatments of DS -03
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
a ..'°, -,, ' -:'""" .w q .!v±cs;' x ✓•..r. -.+ * ,�. .+w^rr.�..'4G.�x ^xcn ;rare^. .. - .�.•t,t °'+s ..,«.. r„- ..,...r. vc �a <. ,..�,;.. �..„ .. .. >..,
• •
BP Exploration Alaska
p � ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
DS-03
10/26/11
Corrosion
Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/
Well Name PTD # API # cement pumped cement off date inhibitor sealant date
ft bbls ft gal
03 1750750 50029200930000 Sealed conductor NA NA NA NA NA
03-02 1760240 50029202030000 Sealed conductor NA NA NA NA NA
03-03 1760390 50029202110000 Sealed conductor NA NA NA NA NA
03-04 1760510 50029202180000 Sealed conductor NA NA NA NA NA
03-05 1760570 50029202220000 Sealed conductor NA NA NA NA NA
03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA
03-07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA
03-08 1760730 50029202310000 Sealed conductor NA NA NA NA NA
03-09 1790220 50029203620000 Sealed conductor NA NA NA NA NA
03-10 1790210 50029203610000 Sealed conductor NA NA NA NA NA
03-11 1790470 50029203830000 Sealed conductor NA NA NA NA NA
03-12 1790580 50029203920000 Sealed conductor NA NA NA NA NA
03-13 1790710 50029203990000 Sealed conductor NA NA NA NA NA
03-14B 2090020 50029204070200 Sealed conductor NA NA NA NA NA
03-15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA
03-16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA
03-17 1791020 50029204200000 Sealed conductor NA NA NA NA NA
03-18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA
-Po' 03-19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/31/2010
03-20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010
03-21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/3/2010
03-22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/26/2011
03-23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/18/2011
03-24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/16/2010
03-25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/17/2011
03-26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 8/2/2010
03-27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/17/2011
03-28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17/2011
03-29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010
03-30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010
03-31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010
03-328 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010
03.33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010
03-348 2000110 50029211320200 0.2 NA 0.2 NA 9.4 10/26/2011
03-35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/28/2010
0336A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010
03-37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 8/2/2010
~ ~~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
~~~~•~~®
MAR 2 4 200
1. Operations Abandon ~ Repair Well Q ~ Plug Perforations ~ Stimulate ~ ~ ,~r~
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well f1C
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~ Exploratory ~~ 1s3-o920 -
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-20971-00-00
7. KB Elevation (ft): 9. Well Name and Number:
62 KB - PBU 03-19 _
8. Property Designation: 10. Field/Pool(s):
ADLO-028331 - PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 11260 - feet Plugs (measured) 10835' 4/3/95
true vertical 9231.82 ~ feet Junk (meas
ured) 10326' 10340' 10350' 10835'
RR
~~~ APR ~ ~ Zuut~
Effective Depth measured 10812 feet
true vertical 8815 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80' 20" Surface - 80' Surface - 80'
Surface 2469' 13-3/8" 72" L-80 Surface - 2531' Surface - 2531'
Production 10587' 9-5/8" 47# L-80 Surface - 10649' Surface - 8663'
Liner 888' 7" 32# SOO-95 10369' - 11257' 8410' - 9229'
Perforation depth: Measured depth: 10658 - 10686 10779` - 10812 10780 - 10809 C 10820 - 10850 C 10855 - 10865
C 10872-10890 C 10894-10908 C10916-10936 C10944-10950 C 10974-10994
True Vertical depth: 8671 - 8697 8784 - 8812 8785 - 8642 8822 - 8850 8855 - 8864
8871 - 8888 8892 - 8905 8912 - 8931 8939 - 8944 8967 - 8985
Tubing: (size, grade, and measured depth) 5-1/2" 17# NT-80 SURFACE - 10268'
4-1/2" 12.6# NT-80 10268' - 10318'
Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BAKER SB-3 PKR 10277'
9-5/8"5-1/2" BKR SB-3A PKR 10336'
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 380 5250 15032 249
Subsequent to operation: 324 4150 14392 244
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory (~' Development ~ Service ~'.
Daily Report of Well Operations X 16. Well Status after proposed work:
OiI ~ Gas WAG ~' GINJ WINJ !~"' WDSPL "'
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Pre Title Data Management Engineer
Signature Phone 564-4944 Date 3/19/2008
Form 10-404 Re sed 04/2006 r ~ ~~ Submit Original Only
03-19
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE I SUMMARY I
1/3/2008'"''** 03-19 LOWER PATCH ASSEMBLY SETTING - E-LINE UNIT 2266 "***
!T/IA/OA: 600/150/150. WELL SI ON ARRIVAL.
RIH W/4.5"OD WEATHERFORD "ER" LOWER PACKER, COLAR LOCATOR,
CPST SETTING TOOL.
CCL TO MID ELEMENT: 13.5 FT. CCL STOP DEPTH: 2728.5 FT
°"MID ELEMENT SET AT: 2742 FT, BOTTnnn nF PA(;KFR C~ 2742._5', TOP OF
'' PATCH @ 2737.7 NINIMUM LD. = 3.00"
iTnmm~~ Fn
**** JOB COMPLETE ****
1/17/2008'*** WELL S/I ON ARRIVAL *** (patch)
`DRIFTED W/ 4.50 CENT TO TOP OF LOWER PACKER @ 2735' SLM
SET WEATHERFORD PATCH (21.83' OAL- 20' BETWEEN ELEMENTS. MIN I.D
`"" 2.98). TOP OF PATCH ~ _2713' SLM
*** JOB IN PROGRESS/ CONT ON 01-18-08 WSR ***
1/18/2008+**"* CONT FROM 1-17-08 WSR ***
:RIG DOWN SURFACE EQUIP & EXTRA RISER
`'**" WELL LEFT SI, DSO NOTIFIED OF WELL STATUS ***
__ _ m _._ _ . ~.._
2/17/2008`***WELL SHUT-IN UPON ARRIVAL***
`INITIAL WHP:475/175/125. RIH WITH WEATHERFORD LOWER ANCHOR SUB,
SET AT 2014'. FINAL WHP: 400/190/240.
3/6/2008 ~**WELL S/I ON ARRIVAL***
SET4 5" 21.6' WEATHERFORD CROME PATCH @ 2,012' SLM.
:SET W/ HALIBURTON ETD & BAKE - N _ F PATCH
1,991' SLM.
***NOTIFY DSO LEFT WELL S/I***
3/7/2008 T/I/0= 400/180/140. Temp = SI. MIT-T PASSED to 2500 psi. (restore tubing
integrity) Pressured tubing to 2500 psi. with 8.7 bbls of crude. MIT-T lost 120 psi. in
the 1st 15 min. and 40 psi. in the 2nd 15 min. for a total loss of 160 psi. during a 30
`min. test. Bled tbg. to 950 psi. (fluid swapped to gas) Final WHP= 950/200/140.
***casing valves open to gauges***
FLUIDS PUMPED
BBLS
1 diesel
1 Total
STATE OF ALASKA ~ ~~ JAN 1 S 2008
ALA~A OIL AND GAS CONSERVATION COMMISSION ~~~'"
REPORT OF SUNDRY WELL OPERATIONSA~aska Oil & Gas Cans. Commission
Anehnrant3
1. Operations Abandon ~ Repair Well Q Plug Perforations ~ Stimulate ~ ~~ Other ~ Patch Tubing
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development ~` Exploratory (~', 183-os2o'
3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number:
Anchorage, AK 99519-6612 50-029-20971-00-00
7. KB Elevation (ft): 9. Well Name and Number:
62 KB PBU 03-19
8. Property Designation: 10. Field/Pool(s):
ADLO-028331 " PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 11260 - feet Plugs (measured) 10835' 4/3/95
true vertical 9231.82 - feet Junk (measured) 10326' 10340' 10350' 10835'
Effective Depth measured 10812 feet F~~~`, ~--, r, , n~py e
7
v~U17G~t~ J~41~ ~ ~ ~~~ .
'
true vertical 8815 feet E
Casing Length Size MD TVD Burst Collapse
Conductor 80' 20" Surface - 80' Surface - 80'
Surface 2469' i3-3f8" 72" L-80 Surface - 2531' Surface - 2531'
Production 10587 9-5/8" 47# L-80 Surface - 10649' Surface - 8663' -
Liner 888' 7" 32# SOO-95 10369' - 11257' 8410' - 9229'
Perforation depth: Measured depth: 10658 - 10686 10779' - 10812 10780 - 10809 C 10820 - 10850 C 10855 - 10865
C 10872-10890 C 10894-10908 C10916-10936 C10944-10950 C 10974-10994
True Vertical depth: 8671 - 8697 8784 - 8812 8785 - 8642 8822 - 8850 8855 - 8864
8871 - 8888 8892 - 8905 8912 - 8931 8939 - 8944 8967 - 8985
Tubing: (size, grade, and measured depth) 5-1 /2" 17# NT-80 SURFACE - 10268'
4-1/2" 12.6# NT-80 10268' - 10318'
Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BAKER SB-3 PKR 10277'
9-5/8"5-1/2" BKR SB-3A PKR 10336'
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 0
Subsequent to operation: 0
14. Attachments: 15. Well Class after proposed work'
Copies of Logs and Surveys Run Exploratory !~` Development ~' Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil Gas WAG ~ GINJ ~ WINJ ~' WDSPL ~-_`,
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preb Title Data Management Engineer
Signature Phone 564-4944 Date 1/16/2008
E k
Form 10-404 ReGised 04/2006 -~ ~_ ~ ~_ ~ ~~~ <<, " ' "~~`~ Submit Original Only
M • •
03-19
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVIT.Y~aTE.~ ;~ . ~ . SUN#MARY .:~
12/25/2007 ~""`WELL S/I ON ARRIVAL""`
=RIG UP SLICKLINE & PREPARE FOR DRIFT TUBING &PDS CALIPER
***CONT. JOB ON 12!26!07 W SR*"*
12/26/2007; """ CONT JOB FROM 12/25/07 "*"
IRAN 3.83" CENT, BLB & S. BAILER, SEE TIGHT SPOT BETWEEN STA'S #7 &
#8, TAG 4 1/2" X-NIP @10,297' SLM.
RAN PDS CALIPER- LOGGED OOH FROM 10,315 SLM TO SURFACE C~
50FT/MIN... GOOD DATA.
RAN 5 1/2" WHIDDON C. SUB, UNABLE TO PASS STA #2 GLM.
:':SET 5 1/2" SLIP-STOP CATCHER @ 5790' SLM.
`:PULLED STA #1, & #2 DGLVS @ 3020' MD & 5693' MD
SET T-2 LGLV IN STA #1 GLM (16/64 ports, TRO 1645#) @ 3020' MD
=SET T-2 OGLV STA #2 GLM [26/64 ports] C~ 5693' MD
;PULLED EMPTY SLIP STOP CATCHER SUB C 5790'
SET 4 1/2" x 2.313" X NIP REDUCER IN TT @ 10307' MD
"`CONT. JOB ON 12/27/07 WSR"*"
__ _ _. .v ___ ___.
12/27/2007 T/I/0=600/300/150 Temp=S/1 Assist slickline C_MIT TxIA to 2500 psi PASSED(Eval
TxIA comm) Spear in to IA w/5bbls of ambient meth followed by 29.4 bbls of 95"
S crude to reach 2500 psi for CMIT TxIA 1st test 1st 15 min lost 50/120 psi 2nd 15
=min lost 20/50 psi for a total of 70/170 psi in 30 min Bled TxIA psi down bled
backaprox. 15 bbls Final Whp's=500/400/150
_~~.. _____ v ,W__ ~.. __...v~_ ~.._...,____
12/27/2007; *" CONT JOB FROM 12/26/07 **"
;.SET 2-7/8" XX TT PLUG IN 4 1/2" REDUCER NIPPLE AT 1029T SLM.
DRIFT TBG W/ 4.54" WFD DUMMY PATCH TO 3154' SLM... DRIFT CLEAR.
;LRS PERFORMED C-MIT Tx IA TO 2500 psi... PASSED [see LRS WSR]
**"* TURNED WELL OVER TO LRS TO BLEED DOWN IA &TBG. """*"
1 /3/2008
""*'' 03-19 LOWER PATCH ASSEMBLY SETTING - E-LINE UNIT 2266 """"
T/IA/OA: 600/150/150. WELL SI ON ARRIVAL.
RIH W/ 4.5"OD WEATHERFORD "ER" LOWER PACKER, COLAR LOCATOR,
CPST SETTING TOOL.
CCL TO MID ELEMENT: 13.5 FT. CCL STOP DEPTH: 2728.5 FT
MID ELEMENT SET AT: 2742 FT, BOTTOM OF PACKER @ 2742.5', TOP OF
PATCH @ 2737.7' NINIMUM I.D. = 3.00"
T/IA/OA: 600/150/150 PATCH SET AT: 2722' - 2742,
""** JOB COMPLETE "'"*"
___~ _ ~__~ -.FLUIDS PUMPED. _.__ __~__ __ _
BBLS
1 DIESEL
1 TOTAL
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Julie Heusser,
Commissioner
THRU:
Tom Maunder,
P. I. SuPervisor
DATE: January 15, 2001
FROM: John Crisp, SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Field
Drill Site 03
.January 15, 2001' I traveled to BP's Prudhoe Bay Field to witness Safety Valve
System tests on DS 03.
Mark Womble was Bp representative in charge of testing DS 03. Testing had
been canceled on DS 03 1-14-01 due to blowing snow & chill factor of-50
degrees. Testing was conducted in a safe & efficient manner. Two failures were
witnessed. The AOGCC test report is attached for reference.
21 wellhouses were inspected during SVS tests. Wellhouses are in fair condition
considering these were inspected after our recent blow. No heat or lights are
installed in wellhoUses for producing wells.
SUMMARY: I Witnessed SVS tests, in PBU on DS 03.
21 wells, 42 components tested. 2 failures witnessed. 4.8% failure rate.
21 wellhouses inspected.
Attachments: SVS PBU DS 03 1-15-00jc
cc;
NON-CONFIDENTIAL
SVS PBU DS 03 1-15-01jc.doc
Alaska Oil and Gas Conservation CommiSsion
Safety Valve System Test Report
Operator: BPX Submitted By: John Crisp Date: 1/15/01
Operator Rep: Mark Womble Field/Unil/Pad: Prudhoe Bay Field DS 03
AOGCC Rep: John Crisp Separator psi: LPS 185 HPS 690
Well Permit Separ set L/P Test Test Test Date
Oil, WAG, GIN J,
Number NUmber PSI PSI -Tdp Code Code Code Passed GAS or CYCLE
03-01 1750750! 185 150 100 P P OIL
03-02 1760240 185 150- 120 P P OIL
03-03 1760390 185~ 150 '110 P P OIL
03-04 1760510.]
03-05 1760570
03-06 1760600 '
03-07 1760530~
03-08 1760730:' 185 150 130 P P OIL
03-09 17902201 185 150 100 P P OIL
03-10 1790210 .
03-11 1790470!
03-12 1790580 '
03-13 1790710!
03-14 .1790820! 185' 150 100 P P OIL
03-15A 1930150: 185 150 100 P P OIL
03-16A '1970330!
03-17 1791020
03.18A 1930420
03-19 1830920 185! '150 90 P P OIL
03-20A 1930470 185! 150 100 P P OIL
03-21 1831120 185! 150 100 P P OIL
03-22 1831230 690! 600 420 P P OILi
03-23 1831270 185 150 0 1 P OIL
03-24A 1980060 690' 600 530 P P ' OIL
03-25A 1930230
03-26 1831510 18'5 150 110 P P OIL
03-27 1840620 185 150 100 P P OIL
03-28 1840720
:03-29 1840790 185150 110 P P OIL
03-30 1840830' 185 150 90 P P OIL
63-31 1840920 185 150 140 P P OIL
03-32A 1940540 185 150 110! P P OIL
03-33A 1970390
03-34B 2000110i 185 150 0 1 P
I I1
SVS PBU DS 03 1-15-01c.xls
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GINJ,
Number Number PSI PSI Trip Code Code Code Passed CAS or CYCLE
03-35 1910800 185 150 90 P P OIL
03-36 1930190
Wells: 21 Components: 42 Failures: 2 Failure Rate: 4.8% [] 9o var
Remarks:
o..o ,~ ,.r9 SVS PBU DS 03 1-15-01c.xls
?--, STATE OF ALASKA ~-.
ALAS~.., OIL AND GAS CONSERVATION )MMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed'
Operation shutdown Stimulate Plugging Perforate X
Pull tubing Alter casing Repair well Other X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
At top of productive interval
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM
At effective depth
338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM
At total depth
344' FNL, 315' FEL, Sec. 16, T1 ON, R15E, UM
5. Type of Well
Development
Exploratory
StralJgraphic
Service
{kY 1 6 1995
~aska OB & Gas Cons. Comm~iOn
6. Datum of elevation(DF or KB)
62 RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
3-19
9. Permit number/approval number
83-92
10. APl number
50 - 029-20971
11. Field/Pool
Prudhoe Bay Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
11260 feet
9232 feet
Plugs(measured) Bridge Plug @ 10812' 'MD (4-3-95)
Effective depth: measured 10812 feet
true vertical 8815 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1990# Poleset 80' 80'
Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531'
Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663'
Liner 888' 7" 350 sx CIG 11257' 9229'
Perforation depth: measured 10658-10686'; 10779-10809'; [Isolated below Bridge Plug: 10820-10850';
10855-10865'; 10872-10890'; 10894-10908'; 10916-10936'; 10944-10950']
true vertical 8671-8697'; 8784-8812'; [Isolated below Bridge Plug: 8822-8850'; 8855-8864'; 8871-8888';
8891-8904'; 8912-8931 '; 8938-8944']
Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD;
4-1/2", 12.6~, L-80, PCT@ 10459' MD
Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A
SSSV @ 2168' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See Attached
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
1005 2350 11407
1241 2854 6764
Tubing Pressure
344
288
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 10-404 Rev 06/15/88
· -,,,-. · I./'7 I~AID
Title
Engineering Supervisor
SUBMIT IN DUPLICATE~
3-19
DESCRIPTION OF WORK COMPLETED
BRIDGE PLUG INSTALLATION FOR WATER SHUTOFF & REPERFORATIONS
3/30/95 ·
RIH & tagged PBTD at 10936' MD.
4/3/95 ·
Performed an Inflatable Bridge Plug installation for Water Shutoff as follows:
MIRU & PT equipment. RIH w/Bridge Plug & inflated to set plug at 10812' MD (mid-element),
to isolate the open perforation intervals below at:
10820 - 10850' MD (Z4)
10855 - 10865' MD (Z4)
10872 - 10890' MD (Z4)
10894 - 10908' MD (Z4)
10916 - 10936' MD (Z4)
10944 - 10950' MD (Z4)
Ref. Log: BHCS 6/28/83.
Sheared off & tagged IBP to confirm set. POOH. Rigged down
4/20/9S'
Reperforated:
10782 - 108O2' MD (Z4)
Ref. Log: BHCS 6/28/83.
Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing at underbalanced pressure.
Returned well to production w/gaslift & obtained a valid welltest.
Gas Cons. c0mm ssi0n
Anchor~.."
Schlumberger
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9463
Company:
5/12/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
Floppy
Well Job # Log Description Date BL RF Sepia DIR MWD Disk
D.S. 2-18 ~-'c~ ~ CNT-D 042595 I 1
D.S. 3-19 ~,~ ._¢~,~.,. PERFRECORD 042095 I 1
D...S. 5-6 (31-6-10-15) '~5-5~ I PROD PROFILE 042095 I 1
D.S. 6-04 '~----(~,. DUAL BURST TDT-P 042095 I 1
D.S. 9-30 ST1_c~5 o~( PERFRECORD 042495 I 1
D.S. 12-21 ~ ~--~-./'~:~ PERFRECORD 042695 1 1
D.S. 12-34 C~z3/. --/~"] PERFRECORD 042495 I 1
D.S. 16-1 o°~3- {~-~ ~ PERF RECORD 04 2395 I 1
D.S. 17-15 c~r~-/~~ PERFRECORD 042595 I 1
.....
SIGNED-
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
DATE: ;'" "!995
5 19.95..
Alaska Oil & Gas Co~s.uomrmssion
Alaska Oil &~~'~'-
Commission
knchor~g-3
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9409
Company:
4/1 3/95
Alaska Oil & Gas Cons Comm
Attn' Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
Floppy
Well Job # Log Description Date BL RF Sepia DIR MWD Disk
D.S. 1-22A 95110 MWDGR 010995 1
D.S. 15-08A 95148 MWD GR. 102693 1
D.S. 2-24 PROD PROFILE 040395 I I '
D.S. 3-19 INFLATABLE BRIDGE PLUG 040395. I 1
D.S. 5-12 PROD PROFILE 040395 I 1
D.S. 9-25 PERF RECORD 032795 I 1
D.S. 9-25 PERF RECORD 032895 I 1
D.S. 9-40 PERFRECORD 0331 95 I 1
D.S. 11-6 :PATCH SE'l-rING RECORD 032595 1 1
D.S. 14-3 ' PATCH SETTING RECORD 040495 I 1
D.S. 15-17 GCT 040595 I 1
~i~i 16-23 COLLAR & JEWELRy LOG 0331 95 I 1
.................
D.S. 16-23 PERF RECORD 0403 95 I 1
D.S. 18-02A GCT 0401 95 I I
APR 1 3 199b
;Allohors: ~
SIGNED:
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
STATE OF ALASKA --
ALASKA OIL AND GAS CONSERVATION C .¢IMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Operation shutdown Stimulate Plugging Perforate X
Pull tubing Alter casing Repair well Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
5. Type of Well
Development
Exploratory
Stratigraphic
Service
6. Datum of elevation(DF or KB)
62 RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
3-19
At top of productive interval
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM
At effective depth
338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM
At total depth
344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM
RECEIVED
MAR 1 4. 1995
feet
9. Permit number/approval number
83-92
10. APl number
50 - 029-20971
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
11260 feet
9232 feet
Plugs(measured) PBTD Tagged @ 10951' MD (1/7/95)
Effective depth: measured 10951 feet
true vertical 8945 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1990# Poleset 80' 80'
Surface 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531'
Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663'
Liner 888' 7" 350 sx CIG 11257' 9229'
Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890';
10894-10908'; 10916-10936'; 10944-10950'
true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931 ';
8938-8944'
Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD;
4-1/2", 12.6#, L-80, PCT@ 10459' MD
Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A
SSSV @ 2168' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See Attached
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Productionorlnjection Data
OiI-Bbl Gas-M~ Water-Bbl Casing Pressure
/.
1008 ~'3155 10305 -
1067 2112 10675 -
Tubing Pressure
353
335
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended__ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ./.~~ "~. ./~.,,..-' Title Engineering Supervisor
Form 10-404 Rev 06/15/88
^^. I/"7 I~,AIR
Date 3 ¢ ~ ¢ ? ~'
SUBMIT IN DUPLICATE
3-19
PERFORATING OPERATIONS
DESCRIPTION OF WORK COMPLETED
1/7/95-
RIH & tagged PBTD at 10951' MD.
2/27/95 ·
MIRU & PT equipment.
Reperforated:
RIH w/perforating gun & shot 25' of reperforations as follows:
10821 - 10835' MD (Z4)
10839 - 10844' MD (Z4)
10919 - 10925' MD (Z4)
Ref. Log: BHCS 6/28/83.
Used a 3-3/8" carriers & shot 4 spf at 180 degree phasing at balanced pressures.
POOH w/perf guns. Noted all shots fired. Rigged down.
Returned the well to production w/gas lift & obtained a valid welltest.
RE¢I IVED
B/ R 1 4 1995
Naska 0il & Gas Cons. Commission
Anchorage
Schlumberger
GeoQuest
500 w. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9310
Company:
3/1 0/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
Floppy
Well Job # Log Description Date BL RF Sepia DIR MWD Disk
D.S. 3-19 PERF RECCRD 022795 I 1
D.S. 4-35 DUAL BURST TDT-P 022895 I 1
D.S. 6-23 PERF RECORD 03 0 2 9 5 1 1
D.S. 7-32 PERF RECORD +JEWELRY 022695 I 1
D.S. 16-21 CHEMICAL CU'I-rER RECORD 022595 I 1
D.S. 7-19 95016 CNL 111394 I
Please sign and return one copy of this transmittal to Sherrie at the above address.
Thank you.
---- STATE OF ALASKA
ALASKA .L AND GAS CONSERVATION C(' MISSION
REPORT OF SUNDRY WELL OPP_.RATIONS
1. Operations performed: operation shutdown .. Stimulate Plugging Perforate X
Pull tubing Alter casing Repair well Other
2. Name of Operator 5. Type of Well 6. Datum of elevation(DF or KB)
Development X 62 RKB feet
ARCO Alaska, Inc. Exploratory
3. Address Stratigraphic 7. Unit or Property
P.O. Box 100360, Anchorage, AK 99510-0360 service Prudhoe Bay Unit
4. Location of well at surface 8. Well number
At top of productive interval 9, Permit number/approval number
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 83-92
At effective depth ~'--)AUG 1 5 1994 10. APl number
338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM Alaska 0il & Gas Cons. Commission 50 - 029-20971
At total depth Anch0ra~e 11. Field/Pool
344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 11260 feet Plugs(measured) PBTD Tagged @ 10993' MD (7/7/94)
true vertical 9232 feet
Effective depth: measured 10993 feet
true vedical 8984 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1990# Poleset 80' 80'
Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531'
Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663'
Liner 888' 7" 350 sx CIG 11257' 9229'
Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890';
10894-10908'; 10916-10936'; 10944-10950'
true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931';
8938-8944'
Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD;
4-1/2", 12.6~, L-80, PCT @ 10459' MD
Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A
SSSV @ 2168' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See attached.
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 1427 ~"1946 7003 -- 289
Subsequent to operation 1518 4401 9011 -- 334
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations Oil x Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Form 1( 'Rev 06/15/88
· ~ .~ O .,I I,I q ~,,.~ · V'~' I%ftlD
3-19
PERFORATING OPERATIONS
DESCRIPTION OF WORK COMPLETED
6/4/94 ·
RIH w/CT & jetted a fill cleanout from 10890' down to 11150' MD.
PBTD tag at 11032' MD.
Made a final post-FCO
6/5/94 ·
MIRU & PT equipment. RIH w/perforation gun & tagged bottom fill at 11017' MD, then PU &
shot 6' of perforations as follows:
Added perforations:
10944 - 10950' MD (Z4)
Ref. Log: BHCS 6/28/83.
Used 3-3/8" carrier, shot 4 spf, at 60 degree phasing. Shot at underbalanced pressure.
POOH w/perf gun. Noted all shots fired. Rigged down.
7/7/94 ·
Performed a Production Profile log & tagged PBTD at 10993' MD.
Returned the well to production w/gas lift & obtained a valid welltest.
RECEIVED
AUG 1 5 1994
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc.
Date:
Subject:
From/Location:
Telephone:
To/LOcation:
August 3, 1994
ARCO Cased Hole Finals
Karla Zuspan/ATO- 1529
(907) 265-6547
Distribution
P.O. Box 100360, A .... norage, AK
Transmittal #: 94068
99510,d~ ~k,
Well Log Date Tool Type Contractor
Number (M-D-Y)
~_ --/6 01-03 7-4-94 Leak Det I SCH
._~'/'~ 5'~ 03-12 7-2-94 Inj Prof 1 SCH
~.~ 03-19 7-7-94 Prod Prof I SCH
_~5 - 2."~ 03-25A 7-7-94 Perf Record 1 SCH
'~ - ¢3 04-02 7-3-94 Leak Det 1 SCH
~_~-~-?? *04-07 ST1 7-8-94 Per[ Record I SCH
?¥-.zz. 05-01 7-9-94 Tubing] Cutter I SCH
~' 05-11 7-9-94 Perf Record I SCH
? ~;~/,,'o 06-11 7-2-94 Dual Burst TDT-P 1 SCH
~' 06-21 7-1-94 Prod Prof I SCH
~'.7,-5'-? i 06-22A 7-4-94 Per[ Record I SCH
~ 07-02 ' 7-4-94 Prod Log I SCH
~ 09-31A 7-8-94 GR/Collar I $CH
r ~-. (( ~ 09-32 7-7-94 Dual Burst TDT-P I SCH
~ 15-01 7-2-94 Prod Prof 1 SCH
~6- ,~-c3 16-02 7-5-94 Inj Pmf 1 SCH
~ 16-10 7-6-94 Inj Pmf 1 SCH
I~,~ 16-24 7-3-94 Per[ Record I SCH
_
~'t -c~G~ 17-07 7-5-94 Leak Der 1 SCH
*The correct APl number for 04-07 ST1 is 50-029-20189-00.
Number of Records: 19
/
,: ^ j ~ .
Kada Zuspan
Distribution: Central Files Phillips
ANO-8 Geology BPX
Exxon State of Alaska~
Mobil
Please~g~.~,~~by signing and returnin ~,~ '¢/,,....
g a'~g, py ~'[r~nsm~
ARCO Alaska, Inc. Is a Subsidiary of AltantlcRIchfleldCompany
ARCO Alaska, Inc.
Date:
Subject:
From/Location: '
Telephone:
To/Location:
June 21, 1994
ARCO Cased Hole Finals
John E. DeGrey/ATO- 1529
(907) 263-4310
Distribution
P.O. Box 100360, ~,.,chorage, AK 99510,~~,
Transmittal #: 94049 '~~F'
Well ! Log Date i Tool Type
Nurr~eri (M-D-Y)
-05ST i 6-13-94 i/~ Dual Burst
1-06 I 6-13-94 1/ Dual Burst
1-11 i 6-14-94 I" PerfRecord
1-25 ! 6-10-94 1/ Perf Record
1-29 ! 6-14-94 i~'' Dual Burst
! i
3-02 ! 6-07-94 i/ Tubing Cutter
3-19 ! 6-05-94 i-/' PerfRecord
4-36 i 6-11-94 !'" Perf Record
4-41 I 6-12-94 t,/Cutter Record
5-11 I 6-11-94 I ~' Dual Burst
9-15 i 6-13-94 I / IniProf
9-18 ~ 6-14-94 i / IniPmf
Run,~,
Scale
I 5"
,
! 5II
1~ 5II
1
1
1 5"
I 5"
I 5"
1 5"
I 5"
1 5"
I 5"
1 5"
~q-
i 9-25 i 6-i4-94 i / injProf
i 11-35 i 6-11-94 I f PerfRecord
i 11-36 i 6-07-94 ! / Perf Record
i 13-31 ! 6-09-94 ! /'' Perf Record
! 13-35 i 6-09-94 1 / Perf Record
/!.. 14-03 i 6-15-94 i ~- Prod Log
14-03 i 6-15-94 t~ Dual Burst
16-23 i.6-13-94 i-" Leak Detection
16-23 i 6-10-94 i/Alpha Tubing
I
17-02 i 6-6-94 i~ Prod Prof
18-02 i 6-12-94 t/ Perf Record
18-04 I 6-12-94 i/- DuaiBurst
8-19 i 6-10-94 t-.'l_eak Detection
i i 5"
1 5"
1 5"
1 5"
1 5"
1 5"
1 5"
1 5"
1 5"
1,1 &5"
! 5II
1, 5"
!
1, 1" &5"
Contractor
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
* The correct APl # for 1-05ST is 50-029-20076-00
Number of Records:
E. DeGrey
Distribution: Central Files
ANO-8 Geology
Exxon
Mobil
Phillips
BPX
State of Alaska-
ARCO Alaska, Inc. Is a Subsidiary of A~ant]cRIchfleldCompany
ARCO Alaska, Inc.
Date:
Subject:
From/Location: '
Telephone:
To/Location-
P.O. Box 100360, ~-chorage, AK
May 23, 1994 Transmittal #:
ARCO Open Hole Finals
John E. DeGrey/ATO- 1529
(907) 263-4310
94038
Distribution
\t
Well 'I Log Date
Number! (M-D-Y)
Tool Type
1-10 I 05-10-94 Collar
3-19 i 04-24-94
3-24 05-1 O-94
05-01-94
3-32A i 05-01-94
3-32A ! 05-01-94
3-32A l 05-01-94
4-5A [ 5-5-94
4-5A ! 5-3-94
r ~ Collar Log
V' Dual Laterolog
,/ BHCA/GR
v/ CNL/GR
v/' SSTVD
-
~-PFC/GR/Coilor
,./' SSTVD
4-5A ! 5-3-94 ~Borehole Prof
4-5A i 5-3-94 CNL/GR
4-5A i 5-3-94 ,v'DuaiLaterolo~]
4-5A i 5-3-94 i,/ BHCA/GR
11-29 I 04-27-94 I JylWD:TVD/GRC,
~v'. EWFI,FXE
04-27-94 . ~WD:MD/GRC,
v EWR,FXE
05-08-94 ,/Borehole Prof
5-8-94 v" SSTVD
5-8-94 ,/ DIFIJGR/SP
05-08-94
11-29 I
11-36 ~
11-36
11-36
11-36
15-32 03-25-94
15-32 04-25-94
15-32 04-25-94
15-32 03-35-94
15-32 05-04-94
15-33 05-04-94
15-33 103-29-94
17-19 [ 04-01-94
* Includes diskette
Number of Records: 27
ARCO Alaska, Inc. Is a Subsl~Jary of AllantlcRl~fl~ldCon1:~ny
vMWD:TVD/DGR,
CNP,DSFD
,/JVI~:MD/DGR,
EWR FXE
v,MWD:'I'VD/DGR,
EWR,FXE
Run, Scale
! 5II
! 5II
1,5"
1, 2"&5"
1, 2"&5"
1, 2"&5"
!
1 "&2"&5"
! 5II
1 2"&5"
1 2"&5"
1 2"&5"
1 2"&5"
1 2"&5"
1, 2"&5"
1, 2"
1; 2"&5"
1, 2"&5"
1, 2"&5"
1-13, 2"&5"
.1-13, 2"&5"
1-13, 2"&5"
1-13, 2"&5"
CNP, DSFD
Section
Slimhole Section 1-13, 2"&5"
MWD:MD/DGR
Collar Log,i 1 ,5"
1-20, 2"&5" !
Contractor
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Sperry
Sperry
Atlas
Atlas
Atlas
Atlas
Sperry
Sperry
Sperry
Sperry
Sperry
Sperry
Sperry
Atlas
STATE OF ALASKA
ALA,SKA OIL AND GAS CONSERVATION COMMISS,,.,N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing x Alter casing Repair well
Perforate
Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
76'NSL, 397'WEL, SEC. 10, TION, R15E
At top of productive interval
373' SNL, 139' WEL, SEC. 16, TION, R15E
At effective depth
338' SNL, 297' WEL, SEC. 16, TION, R15E
At total depth
344' SNL, 315' WEL, SEC. 16, TION, R15E
5. Type of Well:
Development
Exploratory
StratJgraphic
Service
6. Datum elevation (DF or KB)
RKB + 62' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
3-19
9. Permit number/approval number
83-92/Conservation order #258
10. APl number
50- 029-2O971
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth: measured
true vertical
11260
9232
11210
9185
Size
feet Plugs (measured)
feet
feet Junk (measured)
feet
Cemented
Measured depth
True vertical depth
RECEIVED
MAY 2 7 1994
A~sska 0il & Gas Cons. Commission
Anchorage
Tubing (size, grade, and measured depth) 5-1/2", 17#, NT-80, 13CR tubing to 10257'MD; 4-1/2", 12.6/t, 13CR80 tubing to 10330'
MD; 4-1/2", 12.6#, L-80, tubing tail 10356'-10459'MD
Packers and SSSV (type and measured depth) 13-3/8", Baker hydraulic packer @ 1991' MD; 9-5/8", Baker 'SB-3' packer @ 10277' MD; 9-5/8", Baker
'SB-3'packer @ 10336' MD; Camco '7-RDP-1A' flapper valve @ 2168' MD
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Averaae Production or Iniection Data
--
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations x
16. Status of well classification as:
Oil x Gas Suspended
Service
17. I hereby certify that the foregoing is t~'ge~and correct to the best of my knowledge.
S,~ned z.~ ~\\ ,I~~,/.... TitleDrillin~En~lineerSupervisor
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: DS 3-19
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 05/05/94 10:00
SPUD:
RELEASE: 05/10/94 07:00
OPERATION: DRLG RIG:
WO/C RIG: DOYON 16
05/06/94 ( 1)
TD:l1260
PB:l1205
05/07/94 ( 2)
TD:l1260
PB:l1205
05/08/94 ( 3)
TD:l1260
PB:11205
05/09/94 ( 4)
TD:l1260
PB:l1205
ND TREE & ADAPTER FLANGE MW: 8.5 Seawater
MOVE RIG TO WELL DS 03-19. MOVE RIG OVER WELL AND LEVEL
SAME. SET IN SUPPORT TANKS TAKE ON SEAWATER. RIG UP AND
PULL BPV. WAIT ON SECOND LOAD OFF SEAWATER. RIG UP TO
DISPLACE DIESEL FROM WELL. DISPLACE DIESEL FROM WELL TO
VAC TRUCK. DISPLACE WELL TO SEAWATER RECOVERING SOME CRUDE
AND GAS FROM WELL. INSTALL TEST PLUG IN WELL. NIPPLE DOWN
TREE AND ADAPTER FLANGE.
TEST BOPE MW: 8.5 Seawater
NIPPLE UP BOPE. TEST BOPE. LEAKING BY BLANKING PLUG. RIG
UP LUBRICATOR, PULL BPV. MU UP LANDING JT IN HGR, TEST
BOPS AND CHOKE. BACK OUT LOCK DOWNS. PULL LOOSE HGR.
PULLED TO FLOOR, LD HANGER. CIRC BOTTOMS UP. MONITOR
WELL. WRESSURE WELL TO 2000 PSI. PULL AND LAY DOWN 5.5"
COMPLETION STRING. SSSV. RD TBG TONGS. RIG UP, TEST BOPE.
TRIP IN W/ 8.5 BIT & CSG SCRAR MW: 8.5 Seawater
TEST BOPE INSTALL WEAR RING. SERVICE RIG. PICK UP
OVERSHOT FISHING ASSY. TRIP IN HOLE. SLIP AND CUT DRLG
LINE. TRIP W/ FISHING ASS ON 3.5" DP. CHANGE OUT 5"
ROTART BUSHINGS TO 3.5". TRIP IN PU 3.5" DP TO 10250'.
KELLY UP TAG FISH @10286'. WORK OVERSHOT OVER FISH. TRIP
OUT. LAID DOWN REMAINING 5" COMPLETION ASSY. RECOVERED
CUT JT AND SEAL ASSY. LD FISHING ASSY. MU 9 5/8" CSG
SCRAPER AND 8 1/2" BIT. TRIP IN HOLE.
TRIP OUT TO RUN COMP STRING MW: 8.5 Seawater
TRIP IN W/ 9 5/8" CSG SCRAPER. CIRC DOWN TO PACKER TOP
@10325'. REVERSE CIRC. BOTTOMS UP. TRIP OUT. SLM. P/U
5 JTS 2 1/16" & 9 5/8" BAKER TEST PACKER, TRIP IN HOLE.
WASH THROUGH 4.5" PKR AND TAIL PIPE ASSY 10295-10489'.
REVERSE CIRC @10456'. SET 9 5/8" BAKER PACKER @10270',
TEST CASING. CIRC HOLE TO CLEAN INHIBITED SEAWATER. TRIP
OUT STD BACK 80 STDS. L/D 3.5" DP.
RECEIVED
MAY 2 7 1994
fi, iaska Oil & Gas Cons. Oommissir~
Anchorage
WELL : DS 3-19
OPERATION:
RIG : DOYON 16
PAGE: 2
05/10/94 ( 5)
TD:l1260
PB:11205
05/11/94 ( 6)
TD:l1260
PB:l1205
LAND 5.5" COMPLETION STRG MW: 8.5 Seawater
TRIP OUT LAYING DOWN 3.5" DP. L/D BAKER TEST TOOL & 2
1/16" PIPE. PULL WEAR BUSHING. RIG UP WEATHERFORD TBG
TONGS. P/U 4.5" TAIL PIPE & BAKER PACKER ASSY & RUN 5.5"
COMPLETION STRING. RIG UP OTIS CONTROL LINE SPOOL. ATTACH
LINES TO SSSV. PRESSURE LINES. P/U & RUNNING 5.5"
COMPLETION STRING. SPACE OUT P/U HANGER. ATTACH & TEST
CONTROL LINES. DROP BALL INSTALL BPV & LAND TBG.
RELEASE RIG MW: 8.5 Seawater
LAND COMPLETION STRING. RILD. TEST TBG. HGR B/O LANDING
JT. NIPPLE DOWN BOPE. NIPPLE UP ADAPTER FLG & TREE. TEST
SAME. BULL BPV THRU LUBRICATOR. SET TEST PLUG. TEST
TREE. RIG UP TEST TBG & SET PACKER. TEST ANNULUS.
DISPLACE TO DIESEL. PUMP 134 BBLS TO ANNULUS & U-TUBE TO
TBG. INSTALL BPV. CLEAN TREE & CELLAR AREA. PUMP OUT
PITS & SLOP TANKS. MOVE OFF WELL. PICK UP MATTING BOARDS
& HERCULITE. PICK UP AREA. RELEASE RIG @1900 HRS ON
05/10/94.
SIGNATURE:
(drilling superintendent)
DATE:
RECEIVED
MAY 2 7 1994
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc.
Date:
May 24, 1994
P.O. Box 100360, ~. orage, AK
Transmittal #: 94040
9951O
Subject:
ARCO Cased Hole Finals
From/Location:
Telephone:
To/Location:
John E. DeGrey/ATO- 1529 '
·
(907) 263-4310
Distribution
Number. (M-D-Y) ! Scale
2..~ ! OWDW-i 4-29-94 v/, PITS i 1,5" SCH
SW I ~
1-9A I 5-14-94 ,/'"~Perf Rec ! 1, 5" SCH
1-20 i 5-7-94 t/ PerfRec i 1,5" SCH
2-4 ! 5-11-94 v/ ProdProf f 1 5" SCH
2-4 ! 5-11.-94 v'" CNL i 1,5" SCH
2-5 I 5-7-94 v"' Prod Prof i 1, 5" SCH
~'~ ~ ~-z-~4 ,/ ONE ~ ~, ~" SON
2-20 I 4-30-94 ,.//Prod Prof J~ 1, 5" SCH
2-20 ~ 5-13-94 ,/ CNL I 1,5" SCH
3-19 ! 4-4-94 v,'~. Brid~]e Plu~] I 1, 5" SCH
3-29 ! 5-3-94 ],,/ Brid~]e Plu~] i 1, 5" SCH
3-32A i 5-9-94 ~vrJSIT(Cem &Corr) ! 1, 5" SCH
i SCH
4-5A ! 5-17-944 ~/ Perf Rec i 1, 5" SCH
4-SA ~-~7-~4 ~ USlT i ~,S" SCH
5-6 ! 4-30-94 ,/ Prod Prof 1, 5" SCH
5-35 5-3-94 v/ TDT-P 1, 5" SCH
6-10 4-5-94 v/ Leak Detect 1, 5" SCH
-11 SCH
6-22A 5-14-94 v/v~, Perf Rec i 1, 5" SCH
7-3 ! 5-8-94 Prod Prof 1, 5" SCH
7-3 5-7-04 v~, Perf Rec 1, 5" SCH
7-23 5-10-94 ~"3ewelry Set Rec 1, 5" SCH
7-23 5-15-94 ,/'Completion Rec 1, 5" SCH
9-13 5-16-94 v/,Brid~e Plul; 1, 5" SCH
9-26 4-6-94 v/ PerfRec . 1, 5" SCH
9-42 5-15-94 v~/Leak Detect 1, 1" 2" 5" SCH
9-47 I 5-16-94 v' Packer Set Rec 1, 5" SCH
12-8B 5-4-94 ,/ Prod Prof 1, 1" 5" SCH
13-8 f 5.2-94 ~ InjProf ~ 1,5" SCH
13-31 ! 5-2-94 ~,/ usam i ~ 5" SCH
13-35 ! 5-10-94 1,/'- USIT ~ 1, 5" SCH
,: .
14-7 ~ 5-13-94 ~Tubin~ Patch Reci 1, 5" SCH
14-15 ~ 5-17-94 ~ CNL ! 1,5" SCH
14-41 i 5-8-94 /Dual Burst TDT-P i 1, 5" t SCH
16-26 I 5-6-94 ~./ PerfRec ~ 1,5" SCH
17-19 ~ 5-12-94 v" PerfRec 1,5" SCH
18-1 5-16-94 ~ Perf Rec 1, 5" SCH
ARCO AI~ lng. Is a SubsJ~ary of AlianticFI1cflflMdCOnlpany
ARCO Alaska, Inc.
Date'
.
Apr 14, 1994
P.O. Box 100360, , .horage, AK
Transmittal #: 94034
Subject:
ARCO Cased Hole Finals
From/Location-
Telephone:
To/Location:
John- E. DeGrey/ATO- 1529
(907) 263-4310
Distribution
Well
Number
77-54 01-1
~-12Z.; 01-33
"~-"f 5i 03-01
Log Date J Tool Type
(M-D-Y)!
04-02-94 i'"' Perf Record
03-25-94 ] TDT-P
03-28-94
03-27-94
03-02 03-22-94
SS-~?-{ 03-19
~fq_'/cl '-~ 03-29
.:.'% 03-29
03-22-94
03-18-94
l ./- TDT- P
i'" Pert Record
i- Leak Detection
[,, Bridge Plug
~ Leak Detection
03-27-94 !./ Bridge Plug
~[-c~7-i 03-31 03-27-94 !,/ Bridge Plug
i /04-43 03-29-94 i ¢/ TDT-P
t5!(04-43 03-29-94 i/ CNTG
i X04-43 i 03-10-94 !¢' USIT
· .,-..,4 tv, USIT
c~...tOi 04-44 ! 03-1~ o
·
~1~(-:5~i !./ USIT Cement
06-19
07-08
O7-23
09-01
09-02
09-03
09-19
09-27
11 -O4
11-17
1-24A
12-06A
13-20
~-'5~, i 14-03
~?..-~;~( ! 14-23
~ 4-28
3Z-I~ 4-28
i'X,14-28
i~5- F{Z.=. 14-35
~?..-I 5~ 16-04A
1~5-7_q~ 16-18
~Z.- ~ J 16-28
Run,
Scale
Pert Record
1 5'l
5"
5"
5"
2"
5"
5"
5"
5"
1 5"
Contractor
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
1 5"
1 5"
1 5"
I 5"
I 5"
I 5"
Sch
Sch
Sch
Sch
04-45 i 03-29-94
05-08 i 03-14-94 !,/ Prod Profile Sch
03-18-94 Sch
1~, 5II
! 5II
1, 1"&5"
1 511
1, 1"&5"
04-03-94 !.~ Pert Record
· 03-21-94 !'./ Bridge Plug
03-30-94 {~. Prod Profile
03-17-94 i -/ Prod Profile
03-29-94 !/ Prod Log
04-01-94 iv" Pert Record
03-16-94 i / Prod Log
03-22-94 t / Pert Record
03-16-94 ! / Patch setting
! 5II
{./ Pert Record
,/ 5II
Sch
Sch ·
Sch
Sch
Sch
Sch
Sch
1, 5" Sch
1, 5" Sch
03-29-94 1, 5" Sch
03-18-94 i. Prod Profile 1, 1"&5" Sch
03-15-94 Sch
1, 1 "&5"
! 5fl
Leak Detection
CNL
Prod Profile
1, 1"&5"
! 5II
Sch
Sch
Sch
Sch
Sch
Sch
Sch
03-28-94
03-19-94
03-15-94 !,,- Leak Detection 1, 5"
03-28-94
iv" Patch Setting
03-21-94 i/' Bridge Plug
03-17-94 ! v' CNL
03-15-94 i,,-- Perf Record
03-14-94
03-14-94
03-20-94
Leak Detection
1 511
1,5"
1, 2"&5"
: 5 ,I
: 1,
1 5'1
: v- Pert Record
TDT-P
Sch
Sch
Sch
Number of Records: 38
ARCO Alaska, Inc. Is a Subsidiary of AflanflcRIchfleldCompany
ARCO Alaska, Inc.
Date: Feb 25, 1994
P.O. Box 100360, , norage, AK
Transmittal #: 94024
99510,~ ~,
Subject:
ARCO Static Pressure Surveys
-From/Location: John E. DeGrey/ATO-1529
Telephone:
(907) 263-4310
To/Location:
Distribution
Number (M-D-Y) Scale
2-3 { 6-5-93 I Static Press Surv.
2-5 ! 7-21-93, Static Press Surv.
3-8 ! 11-22-93 ! Static Press Surv.
3-19 i 1-3-94 l StaticPressSurv.
3-34A i 11'22'93 I Static Press Surv'
3-35 i 12-7-93 t Static Press Surv.
3-36 l 7-24-93 t Static Press Surv.
4-12 i 11-17-93I Static Press Surv. i " Sch ict~oc~-t°c°c'
t 4-31 i 1-3-94 l StaticPressSurv..
4-32 i 9-8-93 I Static Press Surv.
4-41 ! 11-21-93 t Static Press Surv.
5-12 i 7-21-93 i Static PressSurv.
6-19 i 11-28-93! Static Press Surv.
7-7A ! 7-21-93 StatiC press Surv. I " Sch
7-8 ~ 9-2-93 Static Press Surv.
9-49 i 9-14-93 Static Press Surv.
11-! 9-5-93 Static Press Surv.l " Sch
16ST1
11-17 f 11-26-93 Static Press Surv.
12-16Ai 11-8-93 Static Press Surv.
13-14 [ 7-2-93 Static Press Surv. " Sch
13-14 I 7-2-93 Static Press Surv. " Sch
14-01 i 11-25-93 Static Press Surv. " Sch
14-6 I 11-25-93 Static Press Surv. " Sch
14-18 [ 11-26-93 Static Press Surv. " Sch
14-38 12-4-93 Static PressSurv. " Sch
14-39 12-4-93 Static Press Surv. " Sch c[ ,~c2i3_.ot~ctct
15-6 5-28-92 Static Press Surv. " Sch
15-15 7-5-93 Static Press Surv. " Sch [ ~=t-~0-[O~O
15-16 8-26-93 Static Press Surv. " Sch
15-18 i 10-26-93 Static Press S'urv. " Sch
15-23 l 9-23-93 Static Press Surv. " Sch
16-12 ! 7-21-93 Static PressSurv. " Sch
16-17 ! 12-29-93 Static Press Surv. " Sch
16-18 ! 7-18-93 Static Press Surv. " Sch
16-22 I 7-18-93 Static PressSurv. " Sch
17-1 [ 11-23-93 Static Press Surv. " Sch
17-13 i 8-27-93 Static Press Surv. " Sch
18-29A t 5-19-93 Static Press Surv. _ " Sch
ARCO Alaska, lng. is a Subsidiary o! Alla~llcRIdlflgdComl:eq
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 12-2-93
REFERENCE: ARCO CASED HOLE FINALS
7l?-I1~ 1-3 10-31-93
?~1-4 11-5-93
7~0~ 1-16 11-5-93
1-22 11-7-93
i -24A 10-14-93
-~2~6 10-31-93
-~o 11-6-93
~-~~-30 10-31-93
~?~%-~ 1-32 10-31-93
11-9-93
/~~ii 10-18-03
11-4-93
-9-7 10-20-93
~~-~ 9-7 10-25-95
--5O 11-1-93
5 1-12
11-9-93
1-168T 11-8-93
_ ~//12-16A 10-26-93
12-16A 11-8-93
~_~14-4 11-6-93
10-19-93
and return the attached~f.p~ ~s
RECEIVED BY__~_~
Have A Nice Day!
Sonya Wallace
ATO-1529
# CENTRAL FILES
# CHEVRON
# BPX
# STATE OF ALASKA
Perf Record IO~ % -Jt00~. Run 1, ~' Sch
Perf Record ~9~T~ ~q%'t~ Run 1, 5" Sch
Prod Profile/~o ]Wt--m?lf~[f~Run 1, 5" .o- I 0u. f:~ Sch
Prod Profde [~o~01%7~-mf)f~%/~ca/~Run 1, t~' ] ~°~0~ {0SRO Sch
D~ B~t T~P I~00--11~0~ R~ 1, ~' Sch
Peal Record ~O~lo~Z~ R~ 1, ~' Sch
Peal Record ~0-~ - R~ 1, ~' Sch
Completion Record ~0~ R~ 1, ~' Sch
USIT (C~'~i~v(~m~ Color 'R~ 1, ~' 5~00~0~00 Sch
Peal Record ~$~ ~~ R~ 1, ~' Sch
TBG Patch Record R~ 1, ~' '7000 -7~ Sch
Collar (Packer ~t) . R~ 1, ~' ~O2V~i0q~ Atlas
D~ B~st TDTP ~0~{~0o0 R~ 1, ~' Sch
Pe~ Record ~0~q~0 R~ 1, ~' Sch
Pe~ Record I~%~{~ R~ 1, ~' Sch
~od ~o~e [~tm lZ~}~ff~R~ 1, 1"~" ~t~.~ Sch
IBP Set ~00~o R~ 1, ~' Sch
I,e~ Detect]50~0~f~ ~,m 1, 1" 0~ ~ Sch
Pe~ Record :~ 0~ ~~ R~ 1, ~' Sch
CNL IzI O0-1~9 ~ R~ 1, ~' Sch
Pe~ Record I t~ ~0 ~ 1%%~ R~ 2, ~' Sch
~ Detect l~0~i~O R~ 1, 1"~" Sch
Peal Record ~~ R~ 1, ~' Sch
L~er/Jewe~/G~ R~ 1, ~' ~7~0-550~ Sch
~ Detect(~]~ll~ , ~ 1, T'~" 0- %~o Sch
~od ~o~e ~o ~)f~~~ 1, 1"~" o-t~0%L Sch
TBG ~cher Zu~-~5o R~ 1, ~' Sch
Peal Record 2~00~0~% R~ 1, ~' Sch
receipt of data.
.
t MOBIL
The correct APl# for 3-20A is 50-029-20980-01.
This log was ran on 4-11 not the sidetrack and the correct API# is 50-029-20286-00.
The correct API# for 9-7 is 50-029-20223-00.
This log was ran on 12-16A and the correct API# is 50-029-20899-01.
he correct API# for 18-29A is 50-029-22316-01.
ARCO ,~_ l~.~ka, Inc.
P. 0 .Box 100360
Anchorage, Alaska 99510
REFERENCE:
~__~_~~1-14
DATE: 6-9-93
14-22A
17-19
5-6-93 Static Pressure Run 1, 5" Sch
5-8-93 Prod Profile l~m 1, 5" Sch
5-10-93 Production Run 1, 5" Sch
5-11-93 CBT/New TBG/Jewelry Run 1, 5" Sch
5-10-93 Leak Detect/Spin/Temp/Press l~m 1, 2' & 5" Sch
5-4-93 USIT (Cement & Corrosion) (Color) Run 1, 5" Sch
5-3-93 Inj Proflle/Spin/Temp/Press l~m 1, 5" Sch
5-2-93 Inj Profile/PITS Run 1, 5" Sch
4-24-93 Leak Detect/Spin/Temp/Press Run 2, 5" Sch
5-7-93 D-_~! Burst/TDT-P (Borax) Run 1, 5" Sch
5-6-93 Vertilog Run 1, 5" Atlas
5-8-93 GR/Coll~r Run 1, 5" Atlas
5-6-93 Per[ Record Run 1, 5" Sch
5-7-93 GR/CCL Run L 5" Sch
5-10-93 CNL Run L 5" Sch
5-11-93 Leak Detect Run 1, 2'& [~' Sch
5-7-93 Perf Record Run 1, 5" Sch
5-9-93 TDT-P (Borax) Run 1, 5" Sch
5-3-93 Leak Detect/Spin/Temp/Press Run 1, 5" Sch
5-3-93 Per[ Record Run 1, 5" Sch
5-4-93 Production Run 1, 5" Sch
5-5-93 CCL/Per[Record l~m 1, 5" Atlas
5-8-93 SBT/GR/CCL l~_m 1, 5" Atlas
Run 1, 5" Sch
l~_m 1, 5" Sch
l~m 1. 2' & 5" Atlas
a~.]~_~z~._I4 5-7-93 GR/CCL (Color)
~'~?~AGI-5 5-1~ GR/~ (~1~)
~~I~ ~1~93 GR/~ (~1~)
~~e s~ ~d ret~ ~e a~ched copy ~ receipt of ~
RECEIVED BY_~~~
Have A Nice Day! /~~ APPROVED__~
' ~ .~~Ttmas# 93068
# PHILLIPS
PB WELL FILF~
# BPX
# STATE OF ALASKA
,_? ..... STATE OF ALASKA -_
ALA:" '"' OIL AND GAS CONSERVATIOi OMMISSION
REPOR I' OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate X Plugging Perforate
Pull tubing Alter casing Repair well Other
2. Name of Operator 5. Type of Well 6. Datum of elevation(DF or KB)
Development X 62 RKB feet
ARCO Alaska, Inc. Exploratory
3. Address Stratigraphic 7. Unit or Property
P.O. Box 100360, Anchorage, AK 99510-0360 service Prudhoe Bay Unit
4. Location of well at surface 8. Well number
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM 3-19
At top of productive interval 9. Permit numbedapproval number
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 83-92
At effective depth 10. APl number
338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM 50 -029-20971
At total depth 11. Field/Pool
344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured 11260 feet Plugs(measured)
true vertical 9232 feet
Effective depth: measured 11210 feet
true vertical 9185 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1990# Poleset 80' 80'
Surface 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531'
Production 10587' 9-5/8" 500 sx CI 'G' & 300 sx CS I 10649' 8663'
Liner 888' 7" 350 sx CI 'G' 11257' 9229'
Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890';
10894-10908'; 10916-10936'
true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 10356' MD; 4-1/2", 12.64¢, L-80, PCT tail @ 10459'
MD
Packers and SSSV (type and measured depth) Baker SB-3A packer @ 10336' MD; 5-1/2", Camco Bal-0 SSSV @ 2234' MD
13. Stimulation or cement squeeze summary
Intervals treated(measured) See attached R E E E IV E P
Treatment description including volumes used and final pressure D E0 - rd 1990
14. Representative Daily Average Production or Injection Data Alaska 011 & Gas Cons. C0mm'~ss~¢
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Arl-i~~ressure
Prior to well operation 3090 3374 1525 -- 374
Subsequent to operation 6913 12542 6140 -- 377
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations Oil X Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Sr. Area Operations Engineer Date I?''''/''%/c~O
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLI
DS 3-19
DESCRIPTION OF WORK COMPLETED
FRACTURE TREATMENT OF SAG RIVER & ZONE 4
9/26/90:
Replaced LGLV's w/DGLV's.
9/27/90:
MIRU & PT CT to 4000 psi. RIH w/CT & tagged bottom at 11155' MD.
Pumped 100 bbls of sand slurry (w/7800 lbs of 20/40 sand), to cover open
perforation intervals at:
10872 - 10890' MD (Z4) Ref. Log: BHCS 6/28/83.
10894 - 10908' MD (Z4)
10916 - 10936' MD (Z4)
Flushed CTw/Meth-Water. POOH. Rigged down.
9/28/90:
RIH & tagged top of sand at 10819' MD.
9/29/90:
Performed a fill cleanout of sand down to 10870' MD.
9/30/90:
MIRU, & PT equipment to 8500 psi. Pumped a propped fracture treatment
through the open perforations above the sand plug at:
10658 - 10686' MD (Sag) Ref. Log: BHCS 6/28/83.
10779 - 10809' MD (Z4)
10820 - 10850' MD (Z4)
10855 - 10865' MD (Z4)
Pumped:
a) 253 bbls Pre Pad, @ 55 bpm & 3300 psi, followed by
b) Shutdown. ISIP @ 1550.
Resumed
c)
d)
e)
pumping:
3500 bbls Cross Linked Water Pad w/Regain, @ 55 bpm, followed by
1050 bbls Slurry, w/proppant concentrations of 2 to 10 ppg, followed by
245 bbls Gelled Water Flush. Shutdown.
Placed a total of 319,000 lbs of proppant into the formation, at an average treating
pressure of 4000 psi. Rigged down.
I 0/2/90:
Replaced DGLV's w/LGLV's.
10/3/90:
Performed a proppant fill cleanout to 11180' MD.
I 0/5/90:
Pumped scale inhibition treatment.
Returned well to production, and obtained a valid welltest.
P, EEEIVED
D~'C -- 6 'J990
Alaska Oil & Gas Cons. Commission
Anchorage
,";R C 0 AL. AS'KA:
P.O. BOX i
ANCHOF'..'AGE., ALA:TKA 995--i ,::)
DATE
iTEFEiRIENC:E' ARF:O CAZ:ED HOLE F'Ii"-.~:Ai_S"
a - 'i .3 '?- 7- 9 ::_::,
9-i 8 7-6-9,:.:;:
9-.32 7-i i-?(.)
c,_ ~- o 7-i 2-'90
~, 2 '- i '2 '7- ~ '=',,.. _ o,....~:"
i 2"-~ 6 7-"6-9~.~
i 6-22
i 6 - '" -z 7 - 7':;-- '.'-." ,':',
i 8-i i 7-8-9(:_;,
I-""'-'!"-. g u L, Ur' n , .... ~', 1' 0 N P R 0 F' I L_ ...
PRODUCT ION PF.'.OFii_E
LEAK DETEC'TiON
I NJEC T ! ON F'ROF i Li_'£
I N,.J E C l" :if f..') N F:' F.: O F' I L. E
P F;.'. O D U C 'l' i 0 N P R Ci F' .[ i.. i!:
T~' 'iZ'"'FT--'~j F', ,-.
.... '~.J,.~. ..... U,-, ;- F..'C,'F-il [:'
F'RODUC T i Oi',i PROF i LE
i r_-,',,.- T',EI .... , _ ..
,.. m. H ~, :., "~::. C"~" I F]
Gl;.'. COLLAR
GR ;"Oi i AR
· %.. .._ ~...
T 'T'
LEr:~~',, DET[£CTION/F',., &'
I-! A V E A i".-l, i C E D A Y !
;~A!._i...Y I-tOFFF'C':K FZR
A'TO'- i 52'"2
D i £'TR I B[J T i: ON
-"- CIENTRAL FILES
~..~" CHEVRON
D & H
-,.'"'EXTEi'--~$ l ON. E XF'LOf{'.A T I 0~'~,,
~~ EXXON
MARATHON
:~ i'fi [] B I L
F'H i LLi F',?
!::'B WELL F'Ii...E.,:7
-.--'"' B P X
· ~ ~-~'['Ai'E OF ALAi'{'i<A
TEXACO
ARCO ALA~£KA, iNC.
P, 0. BOX- i (-) ':.'i) S 6 ,:'D
ANCHORAGE, ALASKA
9951O
DATE' t-S'-90
REFERENCE' ARCO~, ,~'RE~'~URE~, DATA
'~-.~ °-i~) ~,, .L4HF .... FLOWING GRADIENT CAML:O
.S.-i 9 6-i i -,':3'T-I BHF'--FLOWZNG Gi:;:ADIEN'i- CAMCO
6--6 9-i 4-89 BI--iP--".:,.,'TATIC. GRADIENT CAMCO
6- i ..a ,-, '-' ,",o .-.
. y-F-o, BHF'--$TATI"' GRADIENT CAMCO
6-"~i~. 9'-28-89 BHP--FLOW.rNG GRADIENT. C:Ai~CO
'..--.'-~ i ,:-)-i 'i -89 BHF'--FI_OWINiJ GRADIENT CAMCO
9 - ".:' '.-7--' ,-; .-~ -,. o.-~
.. ..-' - ~ o- o ..-' BI'4P--~71'AT l C C-RAi) ]: ENT CAMCO
9-3'3' ,~_'~'?_oc~, ,=, ,.,. BHF'--£TATIF:_ GRADIENT CAMCO
'~' R " C,' -' T ..
9-.:~.5 9-S(D-89 ]: HF--~T~, Ir': GRADIENT CAMC:O
9-.55 9-5--89 BHP--$TATIC GRADIENT CAMCO
"i6-2 9-~.3,-89 BHP--$TATZC GRADIENT CAMCO
t .5-i i "=', i ....,'"'-°~,...,. BHP--,z.' TATIC Ut"..~-~,.... I EN'I' CAMCO
i :3-~'~ 9-i ;5-89 BI"tP--$TATIC GRADIENT CAMCO
t4-28 9-i 7-89 BHP--$TATIC GRADIENT CAMCO
i4-.58 ~,-.-°-89 BHP--~TATIC GRADIENT CAMCO
t5-2t 9-5-89 BHF'--$TATIC GRADIENT CAMCO
i 6-2~ t t~-4-89 BHF'--S'TATIC GRADIENT CAMCO
t 8-i 8 '7-.5-89 BHP--J~*TAT!C GRADIENT CAM(](]
t 8-2i 7-.5-89 BHF'--S'TATIC GRADIENT CAMCO
PLEASE ~,IGN AND RETURN 'THE ATTACHED COPY AS RECEIPT OF i)A'¥A~
RECEIVED BY
HAVE A NICE DAY!
~ALLY HOFFECKER
ATO-1~29
'
R£C£1 9
j/:kN - 8 !990 A F' F' F,' 0 V F.: D .6,
DISTRIBUTION
CENTRAL FILES ~ F'H ILLIF'J;
CHEVRON F'B WELL' F]:L_E,S'
~~ D & M ~ R & D
EXTEN£ION EXPLORATION ~ BPX
$ EXXON $ ~TATE OF ALASKA
MARATHON ~ TEXACO
~-"'- MOBIL
ARCO Alaska, IW
Prudhoe L Engineering
Post Office ~ox 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
August 21, ±989
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 3-19, Approval No. 8-294
Dear Mr. Chatterton:
Attached is the Report of Sundry Well Operations detailing work performed on the
above-referenced well.
Sincerely,
D. F. Scheve
DFS/MJB/jp
Attachment
cc:
J. S. Dietz, BP
J. Gruber, ATO-1478
PI(DS 3-19) W1-3
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
RECEIVED
AUG 2 21989
Alaska 0il & Gas Cons. C0mmissl0n
Anchorage
AR3B--6132-C
STATE OF ALASKA
ALASK~OIL AND GAS CONSERVATION C~VIMISSION
REPOR' OF SUNDRY WELL OF-,-'RATIONS
1. Operations performed:
Operation shutdown Stimulate Plugging Perforate X
Pull tubing Alter casing Repair well ~ Other X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
At top of productive interval
373' FNL, 139' FEL, Sec., 16, T10N, R15E, UM
At effective depth
338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM
At total depth
344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM
5. Type of Well
Development
Exploratory
Straligraphic
6. Datum of elevation(DF or KB)
62' RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
DS3- 19
9. Permit number/approval number
83 - 92 / 8 - 294
10. APl number
50 - 029 - 20971
11. Field/Pool
Prudhoe Bay Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
11260 feet Plugs(measured)
9232 feet
Effective depth: measured 11210 feet
true vertical 9185 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 1990# Poleset 80' 80'
Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531'
Production 10587' 9-5/8" 500 sx Class 'G' & 300 sx CS I 10649' 8663'
Liner 888' 7" 350 sx Class 'G' 11257' 9229'
Perforation depth: measured 10658 - 10686'; 10779 - 10809'; 10820 - 10850'; 10855 - 10865'; 10872 - 10890';
10894- 10908'; 10916 - 10936';
true vertical 8671 - 8697'; 8784 - 8812'; 8822 - 8850'; 8855 - 8864'; 8871 - 8888'; 8891 - 8904';
8912 - 8931'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 PCT w/tail @ 10356' MD
Packers and SSSV (type and measured depth) Otis 9-5/8" retrievable packer @10338' MD; Otis RQM SSSV @ 2195' MD
13. Stimulation or cement squeeze summary P, fiCEIVED
Intervals treated(measured) SEE ATTACHED
Treatment description including volumes used and final pressure
AUG 2 2 1989
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
1543 2181 6752
Anchorage
Tubing Pressure
325
4582 4747 377 .... 585
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil X Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Operations Engineering Manager
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
DS 3-19
DESCRIPTION OF WORK COMPLETED
CTU CEMENT SQUEF__.~ZE FOR WATER SHUT-OFF
5/20/88:
MIRU CTU & Stimulation Equipment. PT Equipment to 4000 psi.
RIH w/CT and washed perforations at:
10779 - 10809' MD Ref. Log: BHCS 6/28/83.
10820 - 10850' MD
10855 - 10865' MD
10872 - 10890' MD
10894 - 10908' MD
10916 - 10936' MD
10974 - 10994' MD
Pumped the following treatment:
91 bbls 15% HCI w/25% Xylene.
Displaced w/Crude. POH. Rigged down.
5/23/88:
The Squeeze was performed as follows:
MIRU CT & Cementing Equipment. PT equipment to 4000 psi.
RIH w/CT and fluid packed wellbore w/seawater.
Pumped 45 bbls cement, squeezing perforations:
10779 - 10809' MD Ref. Log: BHCS 6/28/83.
10820 - 10850' MD
10855 - 10865' MD
10872 - 10890' MD
10894 - 10908' MD
10916 - 10936' MD
10974 - 10994' MD
Contaminated cement with 99 bbls contaminant.
5/24/88:
Cleaned out contaminated cement from WB.
I 1/13/88:
Reperforated:
10779 - 10809' MD
10820 - 10850' MD
10855 - 10865' MD
10872 - 10890' MD
10894 - 10908' MD
10916 - 10936' MD
Ref. Log: BHCS 6/28/83.
11/13/88:
Added perforations:
10658 - 10686' MD
Ref. Log: BHCS 6/28/83.
Returned well to production and obtained valid production test.
ARCO AL.A.'iCKA, INC.,
I'", (i, B[iX 1 (.)(-)'36(-)
ANCHOF. iAGE, ALASKA
I) A T E · 6-- 2 8-- 8 9
I:;,'EFEI;,'IFNC, IF' AI;,'CO cAS'ED HOLE I"-'iNAI..S
'5 '"' 8 6 -' t ':.) -'
3'- t '5 6- 9'- 89 I::'l;:C) D LJ C T I (3 N F' I;,' O F I I_ E R U N t , 5:"
5 - t -:!!, 6 '" iii- 8 ? :1: N J E C l" :1:0 N. F"' I:'~" L'I I'"" I L. E I:;~ LIN. i , 5 "
3'-t <;: 6"-t
;'~ - 2 () 6 -
5'"'24 .
c..,'- ',~ - o :r F' R I] D. U C i" I (3 N F' R O I::' .[ I_ E R U N t ,
5.-.~6', 6-i :.."-.?--87 F:'F;:OL:,LJCT]:CIN PF;.:OFIL. E RUN I , '5"
I:'I..EASE S.,'I(;N AND RETUF.:N THE A"F-f'ACHEi) COPY AS i;,'ECEIF'T OF DA'FA.,
C A H C (]
C A H C 0
C r-:-'l ri c t]
c A ti C ()
C r-]. H C t)
C A i',i C CJ
Rli:.] C E: ]: V E I) B Y
HAVE A NICE DAY!
~Al~'ska 0il & ~.~po~ Commission..
RAN$~ 892'74
· ~ L':EN I'RAL. FII..ES
~: C: i..I E V F..' El N
g & i'i
~ EXTENSION EXF'LOF;~AI' I CIN
.,- EXXON
i"iARAI'HON "
:~ HOBIL
· ~ F'HiLLIF'$
F'B WELL FILES'
R & i)
· ..'"' BF'X
· ,- STATE OF ALASKA
~ TEXACO
ARCO ALASKA, INC.
P.O. BOX ~e8368
ANCHORAGE, ALASKA
REFERENCE: ARCO CASED HOLE FINALS
3-9 ii-i3-88 COLLAR/F'ERF RUN i, 5'
J-J9 it-t3-88 COI_LAR/PERF RUN t,
J-25 ti-i9-88 COLLAR/PERF RUN i,
3-26 i2-i?-88 COLLAR RUN t,
3-26 i2-i6-88 VERTILOG RUN i,
5-ii ii-28-88 COLLAR/PERF RUN
7-tt t2-i7-88 COLLAR/PERF RUN
?-i9 t2-i?-88 CNL.GAMMA RUN 2,
7-34 it-ii-88 COLLAR/PERF RUN i, 5"
12-i t2-~8-88 COLLAR RUN
i2-i5 i2-i4-88 MECH. PLUG SETTING RECORD RUN i, 5'
i4-37 i2-i7-88 COLLAR/PERF RUN t, 5'
PWDWi-i ii-9-88 CCL RUN i,
PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA.
GEAR
GEAR
GEAR
AI'LA~
ATLAS
GEAR
ATLAS
ATLAS
GEAR
ATLAS
$CH
ATI_A~
GEAR
RECEIVED BY___
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-i529
TRAN$ ~88724
APPROVED
DISTRIBUTION
CENTRAL FILES
CHEVRON
D&M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
PHILLIPS
F'B WELL FILES
R & D
SAF'C
STATE OF ALASKA
TEXACO
STATE Of ALASKA .... ' //~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LO
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971
4. Location of well at surface 9. Unit or Lease Name
76' FSL, 397' FEL, Sec.10, T10N, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
373' FNL, 139' FEL, Sec.16, T10N, R15E, UM 3-19
At Total Depth 11. Field and Pool
334' FNL, 315' FEL, Sec.16, T10N, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool
RKB 62' Pad 26' ADL 28331
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions
6/17/83 6/28/83 7/25/83* N/A feet MS L 1
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost
11260'MD/9232'TVD 11210'MD/9185'TVD YES E~ NO [] 2234 feet MDI 1900' (Approx)
22. Type Electric or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/CAL, CBL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE 'TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# U-40 Surf 80' 30" 1990# Poleset
13-3/8" 72.0# L-80 Surf 2531 ' 17-1/2" 2300 sx CS I I I & 400 s~ CS I I
9-5/8" 47.0# L-80 Surf 10649' 12-1/4" 500 sx Class G, 300 s~ CS I &
300 sx AS I (2nd Arctic Pack)
7" 32.0# S00-95 10369' 11257' 8-1/2" 350 sx Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
5½"/4½" 10459' 10386' & 1991'(csg pkr)
10658'-10686'MD/8672'-8698'TVD w/6 spf, 120° phasing
10779'-10809'MD/8784'-8812'TVD w/4 spf, 120° phasing
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
10820'-10850'MD/8820'-8851'TVD w/4 spf, 120° phasing
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
10855 '-10865 'MD/8855 '-8865 'TVD w/4 spf, 120° phasing N/A
10872'-10890'MD/8871 '-8888'TVD w/4 spf, 120° phasing
10894 '-10908 'MD/8892 ' -8905 'TVD w/4 spf, 120° phasing
10916 '-10936 'MD/891 2 ' -8931 'TVD w/1 spf, 120° phasing
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
4-7-84I - F1 owing
Date of Test Hours Tested PRODUCTION FOR OILoBBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
04/10/84 4.3 TEST PERIOD I~ 645 499 1 6 106/64I 774
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. I 661 500 24-HOUR RATE {~ 3600 2787 89 24.4°
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
"'^ RECEIVED
* NOTE: Drilled RR 7/3/83. Gyro ran 7/25/83. Workover was performed 11/8/88. DEC
Aiasl~ i)ll & Gas Cons..Comml~ion
'-'.~ ~chorage
Submit in duplicat~v~
Form 10-407
Rev. 7-1-80 CONTINUED ON REVERSE SIDE WC5/048
·
..... NAME ........ " ................. InclUde interval t~ted, pressure data, all fluid~ r~over~ and gravis,
MEAS. D~PTH TRUE VERT. DEPTH GOR, and time of each phase.
.
0/~_Contac~ . 1111 O' 9~3 ~ ~: ~ .;, No~ ~ .-..
_ _
......
.
Top Sadlerochit 10767~ 8773~ .- ·
..
.
,
Base Sadlerochi~ No~ leach~ ~ ,', , ..,: :. ', .... .~'
_ .
_-,:/~: ~. .. . ';' : -' ,~ ~....,'~ :
-: . .:~ : ;:. - , · , ~- .,. · · ,
.-L
. -.~::. ; · : L : .
.
.- . ...
;. . .
. .
.;
~ -~ ~ .. . .
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing, is true a~d corr~t to the best of mY knowledge ' ' '
.... ~ -: . . '~--.: . _ ...
Signed' ' ~~ Title EngineeF Date t
. INSTRUCTIONS
General: This form is designed for submitting a complete and. correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas ii3jection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate produdtion from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval. ..
._
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
·
·
..
'l~em 27.' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
,je~t!o_n,.Gas Injection, Shut-in, Other-explain.
. .;~:ltem 28: If no cores taken, indicate "none".
Form 10407
STATE OF ALASKA
AI_~..,''/~A OIL AND GAS CONSERVATION COMMISo~ON
REPORT OF SUNDRY WELL OPEP TIONS
1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate __
Pull tubing __ Alter casing __ Repair well __ Pull tubing "N Other ~_._.
WORKOVER
feet
True vertical depth
80 ' TVD
2531 'TVD
8663 ' TVD
8410'-9229'TVD
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK
99510-0360
4. Location of well at surface
76' FSL, 397' FEL, Sec.10, T10N, R15E, UN
At top of productive interval
373' FNL, 13,9' FEL, $ec.16, T10N, ELSE, UN
At effective depth
338' FNL, 297' FEL, Sec.16, TION, R15E, UM
At total depth
344' FNL, 315' FEL, Sec.16, TION, R15E, UM
5. Type of Well: ~
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
RKB 62 '
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
3-19
9. Permitnumbedapprovalnumber
83-92/8-109
10. APInumber
50-- 029-20971
11. Field/Pool
Prudhoe Bay Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
11260'MD
9232'TVD
feet Plugs (measured)
feet
None
Effective depth:
Casing
Structural
Conductor
Sudace
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length
11210'MD
9185 ' TVD
Size
feet Junk (measured) None
feet
Cemented Measured depth
80'
2497'
20" 1990 # Poleset 80'MD
13-3/8" 2300 sx C$ III & 400 sx CS II 2531 'MD
10619'
measured
true vertical
& I88 fPi'(c- cs ,,
sx 2~d Arctic pacK)
888' 7" 350 SX Class G 10369'-11257'MD
10658'-10686'MD, 10779'-10809'MD, 10820'-10850'MD,
10855'-10865'MD, 10872'-10890'MD, 10894'-10908'MD, 10916'-10936'MD
8672'-8698'TVD, 8784'-8812'TVD, 8820'-8851'TVD
8855'-8865'TVD, 8871'-8888'TVD, 8892'-8905'TVD, 8912'-8931'TVD
Tubing (size, grade, and measured depth)
5½"/4%", L-80, tbg w/tail @ 10459'
Packers and SSSV (type and measured depth)
Camco 'Bal-O' SSSV ~ 2234', Baker 'SB-3A' pkr ~ 10386', & Baker 9-5/8" csg pkr (~ 1991'
13' Stimulati°n °r cement squeeze summary RE6EiVED
N/A
Intervals treated (measured)
Treatment description including volumes used and final pressure
.;:;ia;;ka Oil & Gas Cons, Commission
14. N/A
Representative Daily Average Production or Injection Data '" '. ~,ncn0rage
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations "'v
16. Status of well classification as:
Oil'S__ Gas __ Suspended __
Service
1Z Iherebycerti~thattheforegoingistrueand cormcttothe bestofmyknowledge.
Signed ~'7-,~' ~ Title Reqional Drillinq Enqineer
Form 10-404 Rev06~5/88 ~ (Pani) 5W03/068
*Workover Well History
S U B M~a¢~N '/~D U p~'i~CA~TE
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Instruclions: Prepare and submit the "Initial Reporl" on the first Wednesday after a well is spudded or worKover operations are started.
Daily work prior to spudding should be summarized on the form giving inclusive dates only.
District I County. parish or borough
ARCO ALASKA INC. J NORTH SLOPE
Field ~Lease or Unit
PBO I ADL: 28331
Auth. or W.O, no. ~Title
AS2459 I WORKOVER
J St at;%K
DS 3-!9 iwe, no.
API: 50-029-20971
Operator
ARCO
Spudded or W.O. begun ~Date
ACCEPT I 10/24/88
Dele and depth
as of 8:00 a.m.
10/24/88 (
TD:11260
PB:11222
SUPV:TJ
10/25/88 (
TD:11260
PB:11222
SUPV:TJ
10/26/88 (
TD:11260
PB:11222
SUPV:TJ
10/27/88 (
TD:11260
PB:11222
SUPV:DCS
10/28/88 (
TD:11260
PB:11222
SUPV:DCS
10/29/88 .(
TD:11260
PB:11222
SUPV:DCS
10/30/88 (
TD:11260
PB:11222
SUPV:DCS
Complete record for each day repo~ed
POOL #102
I ARCO W.I.
I H°ur 2000 J 21.0000 .
I Prior status if a W.O.
NU BOPE MW: 8.5 SEAWATER
MOVE RIG F/3-15, ACCEPT RIG @ 2000 HRS, 10/23/88. TEST CHOKE
MANIFOLD, BLEED ANNULUS, SET BPV, ND TREE, NU BOPE.
DAILY:S33,475 CUM:$33,475 ETD:S33,475 EFC:$961,000
POOH W/ TBG MW: 8.5 SEAWATER
NO BOPE & TEST, ATTEMPT TO SHEAR OUT OF SEAL ASSY, RIH W/
JET CUTTER, CUT TUBING @ 10279', DISPLACE WELL TO SEAWATER,
POOH LD TUBING.
DAILY:$34,268 CUM:$67,743 ETD:S67,743 EFC:$961,000
RIH TO RET.PKR. MW: 8.5 SEAWATER
POOH W/ 5-1/2" TUBING, HOLE IN TBG @ 4200', SBR HAD SHEARED
& FULL STRING WAS RECOVERED, RIH W/ OVERSHOT TO PULL
RETRIEVABLE PACKER.
DAILY:S26,855 CUM:$94,598 ETD:S94,598 EFC:$961,000
LD COMP. ASSY. MW: 8.5 SEAWATER
RIH W/ OS ON DP, TAG SBR, ENGAGE PKR & SHEAR TO RELEASE,
CBU, POOH LD PKR AND COMPLETION ASSEMBLY.
DAILY:S29,823 C0M:$124,421 ETD:S124,421 EFC:$961,000
PULLING PACKOFF MW: 8.5 SEAWATER
LD PKR, SET 7" EZSV @ 10490', TEST 9-5/8" CASING TO 2500
PSI, RUN CET F/ 2600 TO SURFACE, DISPLACED TOP 2300' W/
DIESEL, POOH, RIH W/ 9-5/8" CASING CUTTER, CUT CASING @
2000',POOH, SPEAR CASING & ATTEMPT TO PULL, PULL PACKOFF.
DAILY:S58,029 CUM:$182,450 ETD:S182,450 EFC:$961,000
MU BIT & SCRAPER MW: 8.5 FSW
PULLED 9-5/8" MANDREL HANGER PACKOFF. ATTEMPTED TO PULL
9-5/8" CASING W/ SPEAR, NO SUCCESS. RIH AND CUT 9-5/8"
CASING WITH MECHANICAL CUTTER AT 1999'. RIH, SPEAR AND PULL
9-5/8" CASING. MU 12-1/4" BIT AND 13-3/8" CASING SCRAPER.
DAILY:S33,066 CUM:$215,516 ETD:S215,516 EFC:$961,000
MU CSG BACKOFF TOOL MW: 8.5 FSW
RIH W/ 12-1/4" BIT AND 13-3/8" SCRAPER, TAGGED TOP OF 9-5/8"
CASING STUB AT 2000'. DISPLACED ARCTIC PACK OUT OF HOLE.
RIH W/ CSG BACKOFF. TOOL AND ATTEMPTED BACKOFF, NO SUCCESS.
RIH W/ SPEAR, SPEARED 9-5/8" CSG AND SHOT STRING SHOT
BACKOFF AT 2032'. POOH W/ SPEAR AND MU CSG BACKOFF TOOL.
DAILY:S29,900
The above is correct
see Procedures Manual, Section 10. . __
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formalion name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Secllon will be reported On "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1) Submit "lnlarim" sheets when filled out but not lees frequently than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following selling of oil strin§ until completion.
District
ICounty or Parish
NORTH SLOPE
Lease or Unit
DS 3-19
Field
ARCO ALASKA INC.
PBU
Date and depth
as of 8:00 a.m.
10/31/88 (
TD:l1260
PB:11222
SUPV:DCS
11/01/88 (
TD:11260
PB:11222
SUPV:DCS
11/02/88 (
TD:11260
PB:11222
SUPV:DCS
11/03/88 (
TD:11260
PB:11222
SUPV:TJ
11/04/88 (
TD:11260
PB:11222
SUPV:TJ
11/05/88 (
TD:11260
PB:11222
SUPV:TJ
IWell no.
Complete record for each day while drilling or workover in progress
POOL #102
8)
2)
FISHING CSG SPEAR MW: 8.5 FSW
RIH W/ CSG BACKOFF TOOL AND ATTEMPTED BACKOFF, ACHIEVED
4-1/4 TURNS TO THE LEFT AT SURFACE. POH W/ CSG BACKOFF TOOL
AND RIH W/ 9-5/8" CASING SPEAR. TESTED ARCTIC PACK CEMENT,
INJECTION RATE 3 BPM AT 900 PSI. ENGAGED 9-5/8" CASING W/
SPEAR AND ROTATED TO THE LEFT, POH, LEFT CASING SPEAR AND 2
JOINTS OF DP IN THE HOLE. RIH W/ OVERSHOT, ENGAGED DP,
ROTATED RIGHT TO RELEASE SPEAR, POH, NO RECOVERY. REDRESS
OVERSHOT, RIH AND ENGAGE DP, ROTATE RIGHT TO RELEASE SPEAR.
DAILY:S29,710 CUM:$275,126 ETD:S275,126 EFC:$961,000
RIH W/ 9-5/8" SPEAR MW: 8.5 SEAWATER
POOH W/ OS ON 3-1/2" DP, MU 9-5/8" SPEAR ON 5" DP, ENGAGE
9-5/8" @ 1999', ATTEMPT TO BACK-OUT, POOH LD SPEAR, MU
BACKOFF TOOL, RIH & CYCLE TOOL FOR 12 TURNS, POOH, MU 9-5/8"
SPEAR & RIH.
DAILY:S37,625 CUM:$312,751 ETD:S312,751 EFC:$961,000
ND BOPE MW: 8.5 SEAWATER
SPEAR 9-5/8" CASING & BACK-OUT, POOH LD CSG, RIH W/ 11-3/4"
WP, WASHOVER COLLAR @ 2029, CBU, POOH LD 5" DP, RIH W/
SCREW-IN SUB, 9-5/8 x 13-3/8" PKR, ON 9-5/8" BTC-MOD CASING,
SCREW INTO CASING & PRESSURE UP TO 600 PSI, ND BOPE
DAILY:S128,322 CUM:$441,073 ETD:S441,073 EFC:$961,000
RIH W/ 6" MILL MW: 8.5 SEAWATER
PU 9-5/8" CASING TO 170 K, SET SLIPS, CUT CASING, INSTALL
PACKOFF, NU BOPE, TEST PACKOFF, PERFORM DOWN SQUEEZE ARCTIC
PACK, USING 300 SX AS I, PRESS 9-5/8" CSG TO 2700 PSI TO SET PKR
& TEST CASING, RIH W/ 8.5" GR/JB, STOPPED AT 5050', RIH W/ 6"
MILL, CIRC @ 5200' TO REMOVE ARCTIC PACK, RIH.
DAILY:S91,231 CUM:$532,304 ETD:S532,304 EFC:$961,000
RIH W/ NEW MILL MW: 8.5 SEAWATER
RIH W/ 6" MILL, ROTATE INTO TOP OF LINER, MILL WITH HIGH
TORQUE, POOH, RECOVER 10 LBS. OF METAL, RIH W/ NEW 6" MILL.
DAILY:S31,694 CUM:$563,998 ETD:S563,998 EFC:$961,000
POOH INSPECT DP & BHA MW: 8.5 SEAWATER
MILL ON PLUG @ 10490', CHASE PLUG TO 11048',BRAKE LINKAGE
FAILED, DROPPED BLOCKS DAMAGE TO KELLY & BLOCKS. STRING NEW
BLOCKS, CUT 400' DRLG LINE INSTALL NEW KELLY. CONT POOH TO
INSPECT PIPE AND BHA.
DAILY:S33,527 CUM:$597,525 ETD:S597,525 EFC:$961,000
The above is correct [..
For form prepa'ration and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
ARCO Oil and Gas Company 4~,
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, Or perforating, show formation name In describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerlm" sheets until final
completion. Report official or representative lest on "Final" form. 1) Submit "lnlarlm" sheets when filled out but not less Irequenlly than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following selling of oil string until completion.
ICounty or Parish JStat~ll~(
District ARCO ALASKA INC. NORTH SLOPE
Field ILease or Unit
PBU [ DS 3-19
I
IWell no.
Date and depth
as of 8:00 a.m.
11/06/88 (
TD:11260
PB:11200
SUPV:TJ
11/07/88 (
TD:11260
PB:11200
SUPV:TJ
11/08/88 (
TD:11260
PB:ll200
SUPV:TJ
Complete record l~)~.~,h ~a,~ ~ile drilling or workover in progress
4)
DISP W/ TREATED SEAWATER MW: 8.5 SEAWATER
POOH LD BHA, MU NEW KELLY & TEST, PU 6" MILL, 2BB'S, COLLARS
AND BENT DP RIH, POOH LD BENT DP, PU NEW DP, RIH TAG BP @
10994', PUSH TO 11200', CIRC HI VIS HEC PILL, DISPLACE WELL
TO TREATED SEAWATER.
DAILY:S40,810 CUM:$638,335 ETD:S636,835 EFC:$962,500
POOH LDDP MW: 8.5 SEAWATER
DISPLACE WELL TO INHIBITED SEAWATER, POOH, PU 6" MILL, 2 BB,
30 JTS, 9-5/8" SCRAPER, CONT RIH TO 11200', REVERSE CIRC
BTMS UP, POOH LDDP.
DAILY:S34,473 CUM:$672,808 ETD:S671,308 EFC:$962,500
TESTING TBG ANNULUS MW: 8.5 SEAWATER
POOH LDDP, CHANGE RAMS, RIH W/ 5-1/2" COMPLETION ASSEMBLY,
MU HGR, LAND TUBING SET PACKER @ 10336(WLM}, PU TO SHEAR SEAL
ASSEMBLY, LAND TBG & RILDS, PRESSURE UP ANNULUS TO 2500 PSI.
NOTE: CAMCO 'BAL-O' SSSV @ 2234', BAKER 'SB-3A' PKR @ 10386',
& TT @ 10459'.
DAILY:S284,166 CUM:$956,974 ETD=S956,974 EFC:$961,000
The above is correct
For form preparat~'on and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the firsl Wednesday after allowable has been assigned or well Is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting Ihe entire
operation if space is available.
District ~County or Parish
ARCO ALASKA INC. I' NORTH SLOPE
Field I Lease 'or Un"~"~---- --
PBU / ADL: 28331 DS 3-19
Auth. or W.O. ~2459 ITitle WORKOVER
I Accountlng cost center code
Stet~
IWell no.
Operator ARCO ~.~.Co. ~.:~. 0000
Spudded or W~i~C~% 1Date 10/24/88
Date and depth Complete record for e§c.h,,,d,.ay reported
as of 8:00 a.m. ~L
11/09/88 ( 1
TD:11260
PB:11200
SUPV=TJ
Old TD New TD
Released rig Date
50-029-20971
otal number of wells (active or inactive) on this.
est center prior to plugging and
1
donme.~__nt of t._.~his well
2000 HRS I'67~ ~'a~'~ ~ ~ w'°'
WAITING ON WEATHER MW: 6.7 DIESEL
TEST TBG AND ANNULUS. NO AND TEST TREE. DISPLACE WELL W/
DIESEL. SHEARED OUT. CLEAN PITS. SECURED WELL. RIG
RELEASED AT 2300 }iRS, 11/08/88. WAIT ON WIND TO MOVE RIG.
DAILY:S65,033 CUM=$1,022,007 ETD:S1,022,007 EFC=$961,000
K~iBnDepth
Classifications (oil, gas, etc.) Type completion (single, dual, etc.)
Producing method Official reservoir name(s)
Potential test data
Well no. tDate
Pump size, SPM X length
The above is correct
·
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 88 and 87.
Reservoir
Producing Interval Oil or gas
Choke size
Water %
Test time
Producllon
Oil on test Gas per day
Gravity Allowable Effective date
corrected
ARCO ALASKA., INC~
P.O. BOX
ANCHORAGE, ALASKA
DATE' tt-4-88
REFERENCE
~.~i 5-2i
i '7-6
,~ti °-i
PLEASE:
: ARCO CASED HOLE FINALS
i0/i-2/88 FLUID DENSITY
i 0-24-88 CNL-GAMMA
i O-i 9-88 VERTiLOG
i~/i-S/88 TEMP SURVEY
i ~-24-88 COLLAR
i0-27-88 CCL-F'I_UG SETTING
i ,:3-27-88 CET
9-28-88 COLLAR/F'ERF
9'-~6/~7-88 COLLAR/F'ERF
9-i 6-88 COLLAR/F'ERF
in~_~_oo~,~ PROD~JCTION PROFILE
i~'-S-88 INJECTION PROFILE
9-22-88 INJECTION PROF'ILE
9-26-88 PRODUCTION PROFILE
i~-i-88 PRODUCTION PROFILE
9-i 9-88 COI_LAR/F'ERF
i ~-7-88 GAMMA-COLLAR
i ~-9-88 GAMMA-CCL
i ~)-8-88 COLLAR
9-S,2,- 88 F'RODUCTION PROFILE
9- i 4-88 COLi_AR/F'ERF
~ n-'~-88 PIT~
RECEIVED BY ....
RUN
RUN i,
RUN i ,
RUN i ,
R U N i, 5
RIJN i , $'
RUN i,
F;:tJN i, 5'
RUN i, D '
R~JN t, 5'
RUN i, S'
RtJN t, S'
RUN t,
R~JN
RUN t,
R(JN t , S'
RUN i, 5'
RUN i, 5'
RUN t, S'
F,'tJN t, S'
RUN i , ~'
RUN
R. UN t, D'
RUN t , S'
DATA
HAVE A NICE DAY!
SALLY HOFFECKER
AT0-i5'29
DISTRIBUTION
A PF'R O V E I;'___~.._. ~,..= .~ ....... '" ~'_._ ~
.... ~~:i'~'~ ~,s Cons. Commissbn
Anchorage
CENTRAL FILES
CHEVRON
.
EXTENSION EXPLORATION
EXXON
.
MARATHON
MOBIL
PHILLIPS
1'
F'B WELL FILE:,;'
~- SAF'C
· .- ATE OF- AI_ASI<A
~ TEXACO
CAMCO
Al'LAS
A'FLA.S'
CAMCO
ATL. A?;
$CFt
(:;' E A F;,'
G E A R
., E i-~ .,,
C A M C 0
CAMCO
C A M C 0
C A i'd C 0
CA~CO
ATLAS
GEAR
CAMCO
CAMCO
CAMCO
CAMCO
GEAR
C A i'q C [J
A'f I_AS
THESE LOGS HAVE
7"":33
i=:'- 6, A
_; i
I'FIF:' L:OF;..'RE C i'
NOS ARE'
D ¢-,'r .F; ·
F;.'F:'C'c'q'F'Ht-;c'' ARf:(] F:~,g'F'..D ,LIf'll..F:' F'Ti'-J¢'~l
· ~ L.I ...~'. ~! .............
f'~ A i'4 f": f'l
f; F:' A
fi". A H fi'.' ri
f;': A H f".' f'l
C A H r: r)
f'; F-i' .A F;:
I'; I'= A R'
[;;: r:'.'-, H f":
f": ¢, H F:
f".' A H f": ['i
f": ¢..; H f": f'i
fi ~.':; i'-.i f": f'i
I:;: I::' C' [!: I: V F-!' D B Y .............................................................................
AF,'I:R A! A.'~Kh. TNt'..
F'. FI. T',.[1Y. t
ANF:FtFi[~'Ar;F. Al A.?KA
D~TF'
RI:.'.I:rE'RFNP, F~' AR'[;R P.A.~F..D Hi'll F F"TNAI.
~-t t ,A-i -RFR .T.N..Ir-.71'~T.'[IgN F'ROF.TI..F - R'I.IN i .-4 .
Z-I t 6-t-RR ,~PTNNF'R'/TFMF'I=R~TilRF ,~ilRVFY F,'IlN t ~ ,
4-i,~. .5-.-i9-RR .T.N,IF..CTTON F'r4.'FIF'TI..F. RI.IN t-4,
4-.i ..'3. 5-t 9-8R TFMI::'F.-.'RATI. IRE ,~Uf-;.'VF'Y R'tllg i -4:
7-29 6-8-RR ,gD.I.IF_F.7_F F'ERFOF.'ATTNR-R'FCFIRD R'IIN i.
· ..
F'I.F'.A,~F..7. ,~TT[~.N ANT) RETI.!R'N THF' ATT¢,CFIET) f]F.'IF'Y AY REr..EIF'T OF' DATA,.
HAVE A N!F:.F-. DAY' I ?' ]988
F'FF;~Y RF. NNFTT ~ Alaska Oil & Gas Cons. Commission
A T R- ~ =... ':, o ~,nc,orage
. . ,...,_.. ?
.. ~ ~ ....
T) T..: TE'T R1 IT T FIN
· "- F: F' i'-,! T F;.' A 1 F .T.I._F..?
~ EXTFN,~ION FXPI. OR'A'FTON
~... EXXON
MARATHON
$ - MOB !'!.. -
FITT ~"
mT T .?
F1T .T .~'
flTT,~
ARCO Alaska, Inc. r ~ '
Prudhoe Bay ~.,~gineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
April 19, 1988
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Re: DS 3-19 Permit No. 83-92
Dear Mr. Chatterton:
Attached is the Application for Sundry Approval
performed on the above-referenced well.
Very truly yours,
detailing work to be
D. F. Scheve
DFS/DMF/jp
Attachment
cc: Standard Alaska Production Company
J. Gruber, AT0-1478
Pi(DS 3-19)W1-3
WELLS2/122
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
AR3B--6132-C
~-" : STATE OF ALASKA
ALAS~... OIL AND GAS CONSERVATION COMM...,SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ~. Operation Shutdown r- Re-enter suspended well ~ Alter casing '
Time extension [] Change approved program ~ Plugging [] Stimulate [] Pull tubing ,rq.. Amend order D Perforate~ Other
2. Name of Operator
ARCO Alaska~ Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
At top of productive interval
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM
At effective depth
338' FNL, 297' FEL, Sec. 16,' T10N, R15E, UM
At total depth
344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM
5. Datum elevation (DF or KB)
62' RKB
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
DS 3-19
feet
8. Permit number
83-92
9. APl number
50-- 029-2097]
10. Pool
Prudhoe Bay Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
11260 ' feet
9232 ' feet
Plugs (measured)
RECEIVED
Effective depth: measured 11210 '
true vertical 9185 '
Casing Length Size
Conductor 80 ' 20"
Surface 2497 ' 13-3/8"
Production 10619 ' 9-5/8"
Liner 888' 7"
Perforation depth: measured
true vertical
feet
feet
Cemented
1990# Poleset
2300 sx CS III &
400 sx CS II
500 sx Class G &
300 sx CS I
350 sx Class G
Measured~rage
80'
2531'
Junk (measured) APR 2:0 :i!:lii[;
Alaska 0il & Gas Cons. Commission
True Vertical depth
80'
2531'
10649' 8663'
10369-11257'
8410-9229'
10779-10809' 10820-10850' 10855-10865' 10872-10890'
10894-10908' 10916-10936' 10974-10994'
, ,
Tubing (size, grade and measured depth)
5~"a , 17#/ft, L-80 tubing w/tail @ 10417'
Packers and SSSV (type and measured depth)
Otis 9-5/8" retrievable pkr @ 10338'; Otis "ROM" SSSV @ 2195'
12.Attachments Description summary of proposal ~ Detailed operations program
8784-8812' 8820-8851' 8855-8865' 8871-8888'
8892-8905' 8912-8931' 8966-8985'
, ,
BOP sketch
13. Estimated date for commencing operation
May 1, 1988
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby,.,certify that the foregoing is true and correct to the best of my knowledge
Signed ,~JJ~,,,,,~~ Title Operations Engineerin~ Manager
Commission Use Only
Conditions of approval
Notify commission so representative may witness I Approval No.
[] Plug integrity ~ BOP Test ~ Location clearance
I
Date ~z//~,/~. ~-'
~ORIGINAL SIGNED BY
LONNIE C. SMITH
Approved by
Approved Copy
Returned _ ~
Commissioner
Form 10-403 Rev 12-1-85
I¢i~.T.T..q9/I 79 T')_ lyf. F-ifc_. 263-4278
by order of
the commission Date '~' --~'(~ ~):
Submit in triplicate~.,
DS 3-19 CTU Cement Squeeze
AFF~ 797961
Procedure
1. Make a slickline tag nm to verify thc PBTD. Last PBTD was 11210' MD (ELM) on 1-25-88.
2. Perform a dispersed xylenedHCl, full strength mud acid wash. If thc wells capacity increases
dramatically, repeat the acid wash.
3. RIH with coiled tubing and fluid pack the wellbore with fdtered seawater.
4. Pump 40 bbls of cement followed by 2 bbls of water and 80 bbls of contaminant. Hold 5100
psi (bottom hole) squeeze pressure for 60 minutes. Squeeze off all perforations as follows:
Zone Current Perfs Shot Densi _ty
Z1 10779-10809 6
Z1 10820-10850; 6
Z1 10855-10865 6
Z1 10872-10890 6
Z1 10894-10908 6
V2 10916-10936 '4
V2(3) 10974-10994 4
Jet or reverse out the contaminated cement.
6. Perforate as follows (Ref.: BHCS 6-28-83):
Zone Provosed Perfs
Sag 10i558-10686
Z1 10779-10809
Z1 10820-10850
Z1 10855-10865
Z1 10872-10890
Z1 - 10894-10908
V2 10916-10936
Shot Density
FSD
FSD
FSD
FSD
FSD
FSD
FSD
Reperf
Reperf
Reperf
R~n'f
Reperf
Reperf
7. Test the well.
Other Well Information:
Current status: On production - gas lift.
Expected static bottomhole pressure: 3840 psi.
Expected fluid in wellbore at repea'f~tion: seawater.
4
1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE
2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE)
· 3.,5000 PSI 4 1/6" LUBRICATOR
4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF
RECEIVED
Alaska Oil & Gas Cons. Commlsslor,
Anchorage
H]RELINE BOP EOUIPHENT
6
5
4
3
2
i 1 I
1. 5000 PSI 7" WELLHEAD C:ONNECTOR FLANOE
2. 5000 PSI 4 1/16" PIPE RAMS
,3. 5000 PSI 4 1/6" HYDRAULIC SLIPS
4. 5000 PSI 4 1/6" SHEAR RAMS
5. 5000 PSI 4 1/6" BLIND RAMS
6. .5000 PSI 4 1/16" STUFFING BOX
Oil & Gas Cons. Commission'
CO]LED TUB]NO UNIT BOP EOU]PMENT
i i i i i
__
ARCO AL. AXKA ,
P.D. BOX
ANCHORAGE, AI_AXKA 995t
DATE' 2-25-88
REFERENCE: ARCO CA~ED HOLE FINAl._
f~-t4
"~ t4-24
2-~-88 COl._EAR/PERFORAT I ON
t -25-88 £ONAN
2-4-88 C 01._1._ A R/PERFORAT I AN
2-5-88 CD[..L AR/PERFORAT.T ON
t 4-2t t-22-88 PROI~.TION PACKER
r~ v_. F~WN~... L)A¥'.~'"' /~,c~o~' g
RI.IN
RUN
RI.IN
RI.IN
RUN
OF DATA~
PEGGY BENNETT
AT0-t529
TRAN$ ~88i26 f~
APPROVED
DISTRIBt. JTTON
ATI..A£
ATI_.Ag
ATI...A~
ATI..A~
ATI...A~
CENTRAl_ FILES
CHEVRON
D & M
EXTEN£ION EXPLORATION
EXXON
~ARATHON --
HOBII_
"'.,- F'HII_t..IP$
PR WELL F.T.I..EX
~ ~ ,.~APC
'~ . -
~ ?',~TATE' "OF. ALA.~KA
' TEXACO
STATE OF ALASKA
ALAS, .., OIL AND GAS CONSERVATION COMN,..~SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~., Suspend ~, Operation Shutdown []
Time extension ~ Change approved program ~ Plugging [] Stimulate [] Pull tubing,~ Amend order [] Perforate ~ Other ."~..
2. Name of Operator
ARCO Alaska~ Inc.
3. Address
P. 0. Box 100360, Anchorage, AK
99510-0360
4. Location of well at surface
76' FSL, 397' FEL, 5ec.10~ TION, R15E, UM
At top of productive interval
373' FNL, 139' FEL, 5ec.16, T10N, R15E, UN
At effective depth
338' FNL, 297' FEL, 5ec.16, TION, R15E, UM
At total depth
344' FNL, 315' FEL~ Sec.16, TiON, R15E, UM
11. Present well condition summary
Total depth: measured
true vertical
Effective depth:
11 260 , M D feet
9232'TVD feet ·
measured 11 21 0 'MD
true vertical
91 85 ' TVD
Length Size
80 ' 20"
2497 ' 1 3-3/8"
Casing
Conductor
Surface
P roducti on 1 061 9 ' 9-5/8"
Li net 888 ' 7"
Perforation depth: measured
Re-enter suspended well [] ~ter; casing .~.
5. Datum elevation (DF or KB)
RKB 62 '
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
3-19
feet
8. Permit number
83-92
9. APl number
50-- 029-2(}~71
10. Pool
Plugs (measured)
Prudhoe Bay Oil Pool
None RECEIVED
feet Junk (measured) None
feet
Alaska Oil & Gas Cons. Commis$i0:~
Cemented Measured depth AT~,,l~aical depth
1990# Poleset 80'MD 80'TVD
2300 sx CS Ii I & 2531 'MD 2531 'TVD
400 sx CS II
500 sx Class G & 10649'MD 8663'TVD
300 sx CS I
350 sx Class G 10369'-11257'MD 8410'-9229'TVD
10779'-10809' , 10820'-10850'
10894'-10908', 10916'-10936'
true vertical 8784 ' -881 2 ' , 8820 ' -8851 '
8892'-8905' 8912'-8931 '
,
Tubing (size, grade and measured depth)
5-1/2", 17#/ft, L-80 tubing w/tail ~ 10417'
Packers and SSSV (type and measured depth)
Otis 9-5/8" retrievable, pkr ~ IO~R'~ n~ "~g~" $$$V ~ 2!95'
12.Attachments Description summary of proposal 'j~ Detailed operations program
, 10855'-10865', 10872'-10890'
, 10974'-10994'
, 8855'-8865', 8871'-8888',
, 8966'-8985'
BOP sketch
13. Estimated date for commencing operation March 1, 1988
14. If proposal was verbally approved
Name of approver Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knoWledge
Signed (~~ ~ ~,
Conditions of approval
Approved by ORIGINAL SIGNED BY
Form 10-403 Rev 1~': u, SM~H
Title Associ ate Eqgi n~¢r
Commission Use Only ( J G )
Notifycommission so representative may witness } Approval
[] Plug integrity [] BOP Test [] Location clearanceI
ADP'ovid Copy
Returned
Commissioner
Date
SA3/63
the commission Date
Submit in triplicate
PBU DS 3-19
PROCEDURE
OBJECTIVE: Retrieve the existing 5-1/2" tubing and Otis retrievable packer.
Squeeze a water channel below the existing perforations in addition to the
entire perforated interval. Cut, pull, and replace the 9-5/8" BTC casing
above +2200'MD with new 9-5/8" Mod-BTC casing· After successfully testing
the new 9-5/8" casing and drilling out and testing the squeezed perfora-
tions, 5-1/2" Mod 8rd IPC Class A and B tubing with GLMs and a permanent
packer will be installed. Production will reperforate the well after the
rig moves off.
1) MIRU slickline. Pull equalizing dummy valve from lowest GLM. RD.
2) MIRU workover rig. Circulate seawater through tubing and annulus.
3) Set BPV. ND, NU, test, retrieve BPV.
4) Release packer and POOH w/5-1/2" tubing and packer·
5) RU electric line. Shoot 7" squeeze perfs. RD.
6) RIH w/DP. Acidize and cement squeeze entire perforated interval.
POOH·
7) RIH with RTTS and test squeeze to 2500 psi.
8) Circulate 2300' diesel cap.
RECEIVED
9) RIH, mechanically cut 9-5/8" casing at +2200'MD.
10) Pull 9-5/8" casing.
11) Roundtrip 13-3/8" scraper and 12-1/4" bit to top of cut
·
12) Test Arctic pack to 2000 psi.
13) RIH, back off 9-5/8" casing at 2260'. POOH.
14) RIH, recover 9-5/8" casing stub. POOH.
15) Run new 9-5/8" Mod-BTC casing with external casing packer.
16) Circulate oil base fluid into 9-5/8" x 13-3/8" annulus.
17) Screw into 9-5/8" BTC casing with new Mod-BTC casing.
18) Test 13-3/8" x 9-5/8" annulus to 2000 psi.
19) Set 9-5/8" external casing packer.
-2-
20) ND BOPs, install slips, cut casing, install packoff, NU and test BOPs.
21) Test casing and squeeze to 2500 psi.
22) .RIH and clean out to PBTD at 11210'.
23) Test squeezed perfs to 1000 psi.
24) RIH with 9-5/8" packer and tailpipe on DP, set, POOH and LDDP.
25) Test 9-5/8" casing and packer to 2500 psi.
26) RIH with 5-1/2" tubing and GLMs.
27) Freeze protect well, ND, NU, test, release rig.
BHP = 3840 psi @ 8862'TVD (8.33 ppg EMW)
Workover fluid = 8.5 ppg seawater
DCS/12
2/23/88
ANNULAR
PREVENTER
6
PIPE RAMS
5
BLIND RAMS
4
TUBING
HEAD
2
i I ~-'~iR" CASING u~-, ~,
· . ._- ..... ~ ,C./-~.L.J
9-5/8" CASING HEAD
3 5000 PSi ~ '~' "' ~
.... L,,_,, N,_', HeAD
4. 13-5/'8" - 5000 PS! BLIND RAMS
~ 1.- ..... H 5000 Pq', m'PF PAMq
6. 13-5/8" - 5000 PSI ANNULAR
·
.
.
.
,
i0.
1i
12
13
I,-.1
ACCUMULATOR CAPACITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC PEPORT. THE ACCEPTABLE LOWER LIMIT
iS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STACK TEST
FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL.
CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
iN WELLHEAD· RUN IN LOCK-DOWN SCREWS IN HEAD.
CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MII"IUTES.
BLEED TO -ZERO PSI.
OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE P. Ar'IS.
INCREASE PRESSURE TO 5000 PS! A.,"-;D HOLD FOR !0 MINUTES.
CLOSE VALVES Di..E~,L~. uPSTREAM OF CHOKES. BLEED DOWNSTPEA;
~, ~. '~ ~- ¢",
~- ~/'"~'~ TEST PEMA. INING L,4TE:,~_u
oRESSURE. '~A, ,,, ZERO PSi TO T,_=.T , ,-.~_ ,, ~¢.
MANIFOLD VALVES, !F ANY. WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOWNSTPE"~ ="
. . ~,':. ~., .... SYSTEM TO ZERO PSI.
OPEN PiPE ~AM$. 5ACK. OFF PUNN!HGJTAND PULL OUTOF HOLE.
DL:u~u x .......... ~,~, ', ~ I FOR ~0 ........... BLEED
TO ZERO PSi.
OPEN ELiNDRAMS ANDRECOVEP. TESTPLUG. MAKE SUrE MANIFOLD
LINES APE: ' ' _
~ ULL OF ARCTIC DiESeL AND ALL VALVES ARE 3ET IN
DRILLING POSITION.
TEST STANDPIPE VALVES TO 5000 PSI.
~ ~/~' ~, ~- _- .. _ ' ~ , ,_.
, ~o, ~LL'f ¢'Q(-'~"~; AND !HSiDF BOP TO 5000 PSI ',/TH KOOMEY D, ir'lP
RECORD TEST iNFORMATiOh ON 6LOWOUT PREVENTER TEST FOPM.
AND SEHD TO DRiLLiNG SUPERVISOR.
PERFORM COMPLETE BORE TEST ONCE A WEEK AND FLINCTtONALLY
OPERATE BORE DAILY.
JO NOVEMBER 21, I'286
ARCO Ataska, Inc.
P.O. Box t0036e
Anchorage, Alaska 995te
DATE: June 2 7,t986
REFERENCE:
ARCO Cased Hole Fine[
6-t 4-86
-9 6-~ 9-86
-t? 6-~ 5-86
-~-'3-2 t 6-t 8-86
'"'"4-25 5-2e-86
-~'--.-4-26 5-2t -8~
-'~ 8-B 5-6-86
Spinner Survey Run t 5'
GR Spinner tog Run i 5'
Spinner log Run t 5'
GR/$p inner tog Run t 5'
GR/$pinner log Run i 5 ·
Cement bond log Run t 5'
Cement bond log Run t 5'
Cemnet bond log Run t 5'
Otis
Camco
Camco
Camco
Camco
Gearhart
Gearhart
Gearhart
Please sign and return th.p~a.t.~tached COpy as receipt
Rece i ved By ...... ~ -''
HAVE A NICE ..~. y: ~ ?.~'.-.s:.~~
Linda Hulce
ATO-t 529
TRANE ~86403
of data.
DISTRIBUTION
Central Fi les
Chevron
D&M
Extenzion Exploration
Exxon
Hare thon
Mobil
Phi llips
F'B Well Fi les
$oh i o
State of Alaska
Texaco
STATE OF ALASKA
AL .KA OIL AND GAS CONSERVATION CL .¢IISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ,~ Stimulate Fl Plugging Fi Perforate ~ Pull tubing
A -~ CANCELLATIONOF REQUEST
Alter L;asing ~ Other ~
2. Name of Operator
ARCO AlaSka. Inc.
3. Address
P,O, Box 100360 Anchorage~ AK
4. Location of well at surface
5. Datum elevation (DF or KB)
RKB 62 ' Feet
99510-0360
6. Unit or Property name
Prudhoe Ba;y Unit
7. Well number
76' FSL, 397' FEL, Sec.10, T10N, R15E, UM
At top of productive interval
373' FNL, 139' FEL, Sec.16, T10N, R15E, UM
At effective depth
--
At total depth
334' FNL~ 315' FEL~ Sec.16~ T10N~ R15E~ UM
11. Present well condition summary
Total depth: measured
true vertical
feet
feet
3-19
8. Approval number
R%-q~ fP~.rmit NHmh~.r)
9. APl number
50-- 029-20971
10. Pool
Prudhoe Bay Oil Pool
Plugs (measured)
Effective depth: measured
true vertical
feet
feet
Junk (measured)
Casing Length Size
Cemented
Measured depth
True Vertical depth
Perforation depth: measured
true vertical
Tubing (size, grade and measUred depth)
Packers and SSSV (type and measured depth)
12. Stimulation or cement squeeze summary
N/A
Intervals treated (measUred)
Treatment description including volumes used and final pressure
13.
N/A
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
14. Attachments
Daily Report of Well Operations [] Copies of Logs and Surveys Run C
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~, ~/')4~,'L_/ ~'Z~ .,.,//..t¢._~l_/
Form 10-404 Rev. 12-1-85J
Title Associ ate Engineer
(JG) SW02/108
Date
Submit in Duplicate/q/
DS 3-19
REPORT OF SUNDRY WELL OPERATIONS
The work described in our Sundry Notice, dated 10/28/85, has not been done
and is not scheduled to be done in the immediate future. Therefore, please
cancel our request to perform a workover on this well.
P t--,~t'~,,.,., .,., Oil,_,.~. [las (]ohs. Comml~si~ ,,
Anchora.g[~
SW02/108a
10/13/87
ARCO Alaska, Inc.
P.O. Box t00;560
Anchorage, Almskm
99~0
DATE' August :;5~, ~987
REFERENCE'
ARCO ca~wd 14o I e ~i'nm ~
;'~--:5 8-8--87 F'rod. Profi [e Run ~, 5"
3-~9 8-~-87 Prod. ProfiLe RUn ~, 5"
~--2~ 8-.~-.8? F'rod. Profi[e Run ~, 5"
4-4 8-23-87 Perf. Record Run t, 5"
~5-~8 8-'2~-87 CH CNL.-ThermaL Run 3~, 5"
'I3-98 8-.23-87 CH CNl_-Epi~hermmL Run ~(.), 5"
~~3-98 8-23-87 CH DIL/SFL Run 3~, 5"
Sch
$ch
Sch
Sch
Sch
PLease sign an eceip't of data°
Rosan~e Peek/
A"f'O-~~ . . ,~... ,
'fRANS ~87437 ,
Approved ................................................
D I STR I BI..IT I ON
· ,,-'"' C,=_ r, 't r a t 1:"' i i. e s ... I::' h i !. t i I::' s
· '" £.'.h e v r o n F' B W e [ I. F i [ e s'
D & ?4 F.: & I)
· ~ E: x 'f e n.'4: i c, n E x p [ o r a t i o n.~ .. c, h i o
~: Exxon .~ State of ALaska
Nob i [
ARCO Alaska, Inc.
Post Office , 100360
Anchorage. Alaska 99510
Telephone 907 276 1215
Dante: November 7, 1985
Reference: ARCO CH Finals
/~-2 --CET/ 5-26-85 Run 1 5" Sch
~/-15 CE t 5-26-85 1 5" Sch
~0'-6 --~Perf 7-4-85 1 5" Sch
'~'3-6/~CET 5-23-85 1 5" Sch
v~-7 - CET 5-23-85 ' 1 5" Sch
3 -16~Collar/Perf 7-7-85 2 5" Sch
19/-Perf record 7-5-85 1 5" Sch
./
J4-13~Perf~.;record 7-3-85 1 5" Sch
*-/6-1-' CET 5-22-85
V~-9~ CET 5-10-85
V/6-15 ~'CET 5-27-85
~11-1 i~CET 7-16-85
~/~4-5z/CET 7-29-85
1 5" Sch
1 5" Sch
1 5" Sch
1 5" Sch
1 5" Sch
Please sign as receipt of data.
Received by
Para Lambert
A~ 1429C -A~e 0i~ & ~s Co~s. C0~mJssj0~
Trans 406
Chevron ' PhS 11 ip$ ,
D & M PM Well Files
Expl. Services R & D
Ext. Explora:ion. Sohio ~
Exxon, State of Alaska
Marathon T~xa co ·
Mobil .
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
October 29, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 3-19
Dear Mr. Chatterton'
Enclosed is a Sundry Notice for the subject well. We propose to
pull tubing and repair the well.
We expect to start this work on December 15, 1985. If you have any
questions, please call me at 263-4944 or Eric Witten at 263-4968.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU12/L44
Enclosure
Oil & Gas Cons, Gommissior:
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL []
COMPLETED WELL []XX
OTHER []
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P, 0. Box 100360, Anchorage, AK 99510-0:360
4. Location of Well
Surface: 76' FSL, 397' FEL, Sec.10, T10N, R15E, UN
5. Elevation in feet (indicate KB, DF, etc.)
RKB 62'
I 6. Lease Designation and Serial No.
ADL 28331
7. Permit No.
03-92
8. APl Number
50- f~29_2f~C~?l
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Change Plans [] Repairs Made [] Other []
Repair Well j~
Pull Tubing Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonmentsee20 AAC 25.105-170).
ARCO Alaska, Inc., proposes to perform a workover to repair the subject well.
follows:
The procedure will be as
1. MIRU. Kill well.
2. ND tree. NU BOPE & test.
3. Pull tubing.
4. RIH with test pkr & isolate 9-5/8" casing leak.
5. Cut & pull casing. Install new 9-5/8" casing.
6. PU new SBR assembly and RIH w/tubing.
7. Test tubing and annulus. ND BOPE & NU tree.
8. Secure well & release rig.
A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work.
?.l~y i ii."., "? 7.
BOP equipment will be tested week]), and
operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within permafrost
intervals. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface
safety valve will be installed and tested upon conclusion of the job.
Estimated Start: December 15, 1985
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
(~ ~ ~ ~'f~2 Title Regional Drillinq Enqineer
Signed
·
The space be for Commission use
Conditions of Approval, if any:
By Order of
Approved by
COMMISSIONER the Commission
Submit "Intentions" in Triplicate
Form 10-403 GRU12/SN10 and "Subsequent Reports" in Duplicate
R~.v_ 7-1
,.
ARCO Alaska, Inc. '.
Prudhoe Bay ,-ngineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 283 4248
Donald F. Scheve
Regional Operations Engineer
July 31, 1985
Mr. C. V. "Chat" Chatterton
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Re: DS 3-19
Permit No. 83-92
Enclosed is the Subsequent Sundry Notice for work completed on the
above-mentioned well.
Very truly yours,
D. F. Scheve
DFS:JEB:pr
Enclosures
cc: SOHIO Alaska Petroleum Co.
File Pi(DS 3-19)W4-3
ARCO Alaska, Inc. Is a Subsidiary of AtlanllcRIchfleldCompany
STATE OF ALASKA
ALASKA (31L AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL []
2. Name of Operator 7. Permit No.
ARCO Alaska, Inc. 83-92
8. APl Number
50-029-20971
OTHER []
3. Address
P.O. Box 100360, Anchorage, Alaska 99510
4. LocationofWell (Surface)
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
(Producing Interval)
383' FNL, 139' FWL, Sec. 16, T10N, R15E, UM
(Total Depth)
334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
62' RKB, Pad 26' I ADL 28331
12.
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
DS 3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF:
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
X[~ Altering Casing []
[] Abandonment []
[] Other []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Began perforating operation on 7-6-85. RU perforating unit and pressure tested
equipment. RIH w/gun #1, shot interval 10894' - 10908' MD (6SPF). Shut-in well,
POOH, all shots fired. RIH w/gun #2, shot select-fire interval 10840' - 10850' MD
(6SPF); pulled up and shot select-fire interval 10820 - 10840' MD (6SPF). Shut in
well, POOH, all shots fired. RIH w/ gun #3, shot select-fire interval 10872' -
10890' MD (6SPF); pulled up and shot select-fire interval 10855' - 10865' MD (6SPF).
Shut-in well, POOH, lower 18' of gun did not fire. RIH w/gun #4, shot interval
10872' - 10890' MD (6SPF). Shut-in well, POOH, all shots fired. RIH w/gun #5, shot
select-fire interval 10799' - 10809' MD (6SPF); pulled up and shot select-fire
interval 107~79' - 10799' MD (6SPF). Shut-in well, POOH, all shots fired. Secured
well, RD.
Ref: BHCS 6-28-83
RECEIVED
Alasks 0il & Gas Cons. Commission
~.qch0ra.n,e
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ,~¢.-'~~z~~'~ Title Regional Operations Engineer/~__Date--7/"~//~'--~-, .
The space below for Commission use ,-~-~-~-- / ") '- -~ /-" rlC~/&/'-~
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission Date __
Form 10403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc.
Prudhoe Bay I~..~lineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
December 21, 1984
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
Re:
DS 3-19
DS 3-21
DS 3-23
DS 3-25
Permit No. 83-92
Permit No. 83-112
Permit No. 83-127
Permit No. 83-145
Attached are Sundry Notices for work proposed on the above-mentioned
wells.
Very truly yours,
D. F. Scheve
DFS/JEB/mjb
Attachments
CC:
Sohio Alaska Petroleum Company
File Pi(DS 3-19)W1-3
File PI(DS 3-21)W1-3
File PI(DS 3-23)W1-3
File Pi(DS 3-25)Wl-3
ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany
"-" STATE OF ALASKA
ALASKA O~L AND GAS CONSERVATION CO,v, MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, Alaska 99510
COMPLETED WELL
OTHER []
4. Location of Well (Surface)
76' FSL, 397' FEL, Sec 10, T10N, R15E, UM
(Producing Interval)
383' FNL, 139' FWL, Sec 16, T10N, R15E, UM
(Total Depth)
334' FNL, 315' FEL, Sec 16, T15N, R15E: UM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
62' RKB: Pad 26' I A~T. 78331
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
7. Permit No.
83-92
8. APl Number
50- 029-20971
9, Unit or Lease Name
Prl]~h~ R~y Unit
10. Well Number
D.q ~-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
(Submit in Triplicate) (Submit in Duplicate)
Perforate [~] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc. proposes to perforate well 3-19 at selected intervals within the
Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 500(
psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The
SSSV will be installed at the conclusion of the perforating and clean-up operation.
Proposed Perforation Intervals:
10779 - 10809' MD (30')
10820 - 10850' MD (30')
10855 - 10865' MD (10')
10872 - 10890' MD (18')
10894 - 10908' MD (14')
Ref: BHCS 6-29-83
REC£1VED
Alaska Oil & Oas Cons. Commission
Anchorage
14. i hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~'.'~'~-~ ~ ~-/~' ~'(~ ~'
The space below for Commission use
Title
Regional Engineer
Date
Conditions of Approval, if any:
Approved by
Form 10-403
Rev. 7-1 ~0
COMMISSIONER
Approved Co~¥ p.~t rn" ,
the Commission Date7_~_¢~_~_ TT~,;~ ....
Submit "lrftentj~Sns" infTriplicate
and "Subsequent RelSorts" in Duplicate
::
ARCO A La:::.'ka ~
'::' n Box i 00360
.Ancl'~o'.,"age, A La.ska:, 99.5t 0
:-,.. 5:: -. :::. , lie N C E A R C.: O C a .'-_:: e d i.-!.,.':.', L ,.'.:-:, F- i r., a i...'i:
F;..' t.t 'n
F;-'. 5.,,..,..,
i" ,:-.'.:, 4' :-'.i i- i'i '[' J"., e a '1; 4,.. a c' h e (:J ,.':: o t::' Y a :i!: l" e C ,'/-;, J I::' .1:
,:..,...:,....,: ,,,. ocr 2
~"~ :..~ v ,:::. .*~ r~..~. C 'r_'i: D A Y.'
Alaska Oil & Gas Cons. Commission
K ,.'-:.:, L i. '::/ H,.': F:' a 'r' 1. a n d Anchorage
A 'f' '"'"
t.., "i 42Pi::'
'!" F;.: A N ,? '"' '''" o
Chevron Hob i I.
i) & i'4 H(::,bi I.~::.'"' & F:'
[-"Xl:~t-orat'ion ,?ervice.-'~ Phi I_[ip.~
E x 4' e n s' i o n E: x p I. o r a t' i o n F:' '~" u. cl h ,'.:, e B a y W e I. I.
Exxon F;..' & D
(.; e t' 't y ,S' o h i o
i"-iara't:hon State of ALa.ska
,, .
ARCO Alaska, Inc. ---~
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 277 5637
August 1,
Reference:
1984
ARCO Pressure Data
3-15-84 PBU/CDBR Otis
5-25-84 PBU/CDBR Camco
5-30-84 PBU/CDBR GO
5-25-84 PBU/CDBR Camco
6-29-84 PBU Camco
5-24/25-84 CDBR GO
6-16-84 Static Survey GO
6-15-84 Static Survey GO
6-14-84 Static Survey GO
6-14-84 Static Survey GO
6-30-84 PBU GO
7-2-84 PBU/CDBR GO
6-20-84 Static Survey Camco
6-20-84 Static Survey Camco
6-21-84 Static Survey Camco
5-19-84 CDBR
5-20-84 CDBR
6-22-84 PBU/CDBR Camco
6-28-84 Static Survey Camco
CDBR
CDBR
CDBR
CDBR
-84 CDBR CDBR
D.S. 1-4 ~-
D.S. 1-25
D.S. 1-26_r-
D.S. 3-19
D.S. 3-22r-
D.S. 3-23 f
D.S. 6-17-'~--~ '
D.S. 7-7A ~--
D. S. 7-13
D.S. 7-14
D.S. 7-16~
D.S. 7-16~-'~-
D.S. 9-8~
D.S. 9-18/
_
._
D.S. 12-16~-
D.S. 12-17f
D.S. 13-33-~
D.S. 14-8
D.S. 14-23 ;---5-16-84
D.S. 14-24~ 5-17-84
D.S. 14-25 5-18-84
D.S. 14-32~ 5-20-84
D.S. 14-33~- 4-29/30
D.S. 14-34 ~ 5-19-84
data.
sign and return
the attached copy as receipt of
Kelly McFarland
ATO-1429F
Trans. ~290
DISTRIBUTION
dhevron
D&M
Dr i 11 ing
Exp. Services
Ext. Exploration
Exxon
Ge tty
Marathon
Mobil 0il ~ ~'.:,s ',..
Mobil E & P
Phillips
Prudhoe Bay Well Files
R& D
Carolyn Smith
Sohio
State of Alaska
ARCO Alaska, In
Post Office Box 360
Anchorage. Alaska 99510
Telephone 907 277 5637
August 1, 1984
Reference: ARCO Cased Hole Finals
D.S. 3-6 ....... 6-10-84 Diff Temp
D.S. 3-19---~ 5-25/26-84 Spinner Survey
D.S. 3-22~ 6-29-84
D.a. 6-10f 7-4 -84
D.a. 7-3-- 7-6-84
D.a. 7-18~ 7-4/5-84
D.S. 7-24' 4-19-84
D.a. 9-18--- 6-21-84
D.a. 12-15-~ 4-13-84
Spinner Survey
Temp Log
Temp Survey
Spinner
Spinner
Diff Temp
Spinner
D.S. 12-18- 4-14/16-84 Spinner
D.S. 13-1/~ 6-17-84
D.a. 13-10'-~' 6-22-84
D.a. 13-12~- 6-18-84
D.a. 13-13-'-5-31-84
~ -' D.S. 13-16J''~ 4-12-84
'-~'~ '-r-7-'"' ~ S 13-27 >/- 6-2-84
D.S. 13-28~ 6-3-84
D.S. 13-28~- 6-3-84
D.a. 13-28--- 7-8-84
D.a. 13-33~ 6-22-84
D.S. 13-33~ 6-23-84
D.S. 14-3'~x 6-30-84
D.S. 14-21- 7-7-84
D.S. 14-24/ 3-25-84
D.S. 14-34~'' 5-19-84
Diff Temp
Temp Log
Diff Temp
CFa/Spinner
Diff Temp
CFa/Spinner
CFa/Spinner
Temp Survey
Temp Log
Diff Temp
Spinner Log
Diff Temp
Caliper Log
Caliper Log
Spinner Log
Run 1 5" Otis
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" GO
Run 1 5" Camco
Run 1 5" GO
Run 1 5" Go
Run 1 5" Camco
Run 1 5" GO
Run 1 5" GO
Run 1 5" GO
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 1 5" Camco
Run 4 5" Camco
Run 1 5" Camco
D.~. 17-10/ 6-17-84 Diff Temp Run 1 5" Camco
~/~.lease sign and return copy as receipt
the
attached
of
data.
Kelly McFar land
ATO-1429F
· Trans. 9301 Chevron
D&M
Drillin~
Exp. Services
Ext. Exploration
Exxon
Getty
Marathon
Mob i 1
PhL11Lps
?rud~oe ~ay gelL FLles
Caroty~
Sohio
State of Alaska
ARCO Alaska, Inc.
Post Office B~-.~,,360
Anchorage,, ka 99510
Telephone 907 277 5637
ARCO Alaska, inc. ~-
Post Office E ~ 360
Anchorage. Alaska 99510
Telephone 907 277 5637
May 17, 1984
Reference:
ARCO
Pressure Data
D.S. 3-19f
D.S. 3-22/
· 3/
D S. 3-2
D.S. 4-1j
D.S. 6-4/
D.S. 6-7f
D.S. 6-18
D.S. 6-23
D.S. 7-20
D. S~. 7-21
D.S. 7-22
D.S. 7-24
D.S. 7-25/
D.S. 7-26'
D.S. 12-7A/
-D.S. 12-15"
D.S. 12-18
D.S. 13-13
D.S. 13 15
D.S. 13-16
D. S 13 33
D.S. 18-7 /
4-9-84 Static Camco
4-9-84 Static Camco
4-9-84 Static Camco
3-17-84 Static Camco
1- 25- 84 PBU GO
1-25-84 Common Data Base Report
1-15- 84 PBU GO
1-15-84 Common Data Base Report
12-27-83 Horner Plots w/listing Sch
8-11-83 Horner Plots w/listing Sch
4-18-84 PBU Camco
4 - 29- 84 PBU DA
4=20-84 PBU Camco
4-20-84 Common Data Base Report
4-20-84 PBU r, Camco
4-21-84 Common Data Base Report
4-22-84 PBU Camco
4 - 28- 84 PBU DA
4-14-84 PBU Otis
4-14-84 Common Data Base Report
4 - 13- 84 ~BU Camco
4-13-84 Common Data Base Report
4-15-84 PBU Camco
4-16-84 Common Data Base Report
4-12-84 Static DA
4'i3-84 PBU DA
4-12-84 Pressure Draw-Down Camco
41-5-84 Static DA
3-14-84 PBU DA
3-14-84 Common Data Base Report
~ePle~$e
sign and return
the attached copy as receipt of data.
Kelly McFarland
'ATO-1429F
Trans. # 187
Have A Nice Day:
D & M Mobil E & P
Drilling Phillips
Exp. Services Prudhoe Bay Well
Ext. Exploration R & D
Exxon Carolyn Smith
Getty Sohio
Marathon State of Alaska
ARCO Alaska, Inc.
Post Office 360
Anchorage, 99510
Telephone 907 277 5637
April 26, 1984
Reference: ARCO Cased Hole Finals
/
D.S. 1-25J 3-18-84 / PFC/GR
DXS~. 3 [9 4-7-84 /~' Collar/Perf
D.S. 3-22J 4-7-84/ Collar/Perf Log
D.S. 3-23~-~'4-7-84z'~ Collar/Perf Log
D.S. 5-9/~' 4-8-84,/ CFS/Temp Survey
D.S. 7-16/ 3-10-84/ EPL
D.S. 9-14/ 4-6-84/ Collar/Perf Log
D.S. 9-17'~ 4-6-84~
· p.S.
D.S
D.S
D.S
D.S
D.S
D.S
--'D. S
-.D.S
~-.S
D.S. 9-21/ 1-11'-84;
9-23,~ 3-8-84/
9-25" 4-2-84 /
12-26-",2-19-84/
12-27~3-6-84/
12.-28/ 3-28-84"
12-28'"' 3-30-84
13-11
13-11
13-98
D S. 13-98
D S 13-98
D S 13-98
D S 13-98
D S 13-98
D S 13-98
Collar/Perf Log
Collar/Perf Log
ACBL/~DL/Signature/GR ,/~
ACBL/VDL/Signature/GR
'Epilog/Sandstone Analysis
ACBL/VDLJSignature/GR
ACBL/VDL/Signature/GR Run 1
ACBL/VDL/Signature/GR Run 1
Collar Log (used to cut tubing) Run 1
4-4-84~ 'Collar/Perf Log Run 1
4-4-84< Diff Temp Run 1
5-8-83 / Epilog/Carbon-Oxygen 5-pass overlay5" DA
3-16-84/ CPL/GST/DIL (3 runs) w/listing 5" Sch
no date / Epilog/overlay avg..CO, SI/CA, SW 5" DA
11-12-83/ Epilog/~Carbon-Oxygen 6-pass overlay5" DA-
no date~ Epilog~COmpare Induction Curves 5" DA
2-13-84" Epilog/Carbon-Oxygen 5-pass overlay5" DA
2-19-84~ GST Inelastic & Stations Run 3
5" DA
Run ALL 5" GO
Run 1 5" GO
Run ALL 5" GO
Run 3 5" GO
Run 1 5" Sch
Run 1 5" GO
Run 1 5" GO
Run 1 5" GO
Run 1 5" DA
: Run 1 5" DA
5" DA
Run 1 5" DA
5" DA
5" DA
5" GO
5" GO
5" GO
5" Sch
D S 13-98
D S 13-98
'D S 1-3-98
~ 13-98
D.~/ 14-32' 4-1-84/ Collar/Perf Log Run 1
/~. 16-5-- 3-10-84/ Completion Record Run 2
V Please sign and return the attached copy as receipt of data.
Have a Nice Day!
2-18-84 GST Capture</& Activiation Run 3 5" Sch
3-30-84/ CH D%L ~ Run 11 5" Sch
2-14-84z CH CNL Run 4 5" Shc
2-16-84/ CH DIL Run 10 5" Sch
5" GO
5" Sch
Kelly McFarland
ATO-1429F Chevron
DISTRIBUTION
Mob i 1
D&M
Dallas
Drilling
Ext. Exploration
Exxon
Getty
Trans. #171
Phillips Alaska Oil &~t~:~ Corls, Cor}]misoion
Prudhoe Bay Well Pile~~ch°rc~°
R&D
Carolyn Smith
Sohio
Marathon
State of Alaska
ARCO Alaska, Inc
Prudhoe Ba~ ~ngineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
April 24, 1984
Mr. C. V. "Chat" Chatterton
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Re:
DS 3-19 Permit No. 83-92
DS 3-22 Permit No. 83-123
DS 3-23 Permit No. 83-127
Enclosed are the Completion Reports for work done on the
above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/WT/lmh
Enclosures
cc: SOHIO Alaska Petroleum Co.
File Pi(DS 3-19,22,23)W4-3
ARCO Alaska, Inc, Is a Subsidiary of AllantlcRIchfleldCompany
STATE OF ALASKA
- ' ALASK. )IL AND GAS CONSERVATION 'clMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Classification of Service Well
1. Status of Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2, Name of Operator 7. Permit Number
ARCO Alaska~ Inc. 83-92
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50-029-20971
4. Location of well at surface 9. Unit or Lease Name
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM DS 3-19
At Total Depth 1 1. Field and Pool
334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool
62' RKB, Pad 26' ADL 28331
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ] 15. Water Depth, if offshore } 16. No. of Complet,ons
6/17/83 6/28/83 7/25/83I N/A feet MSL] 1
~ ~IDe p; 2w~0elr SSSVset [ 21. Thickness of Permafrost
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ I-VD) 19. Directional Survey e h e
11260'MD, 9232'TVD ll210'MD, 9185'TVD YESi~ NO [] i feet MD 1900' (approx)
22. Type Electric or Other Logs Run
DIL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL, Gyroscopic survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5~ H-40 Surf. 80' 30" Installed w/1990~ Pole~et
13-3/8" 72.05~ L-80 Surf. 2531' 17t~." Cmtd w/2300 sx CS III ~ 400 sx CS II
9-5/8" 47.0# L-80 Surf. 10649' 12~" Cmtd w/500 sx "G" cat
7" 32.0# S00-95 10369' 11257' 8~" Cmtd w/350 sx "G" cat
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
10916-10936' MD 8912-8985' TVD 5½" lOa]7' 10~'
10974-10994' MD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
All shots with 3-1/8" gun, 4 spf DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
Ref: BHCS 6/29/83 N/A
27. PRODUCTION TEST
Date First Production I Method of 'Operation (Flowing; gas lift, etc.)
4/7/84I Flowing
Date of Test Hours Tested PRODUCTION FOR OIh-BBh GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO
4/10/84 4"3 ' TEST PERIOD 645 499 16
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 1661 500 24-HOUR RATE J~ 3600 2787 89 24,4
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
.
U/A
" RECEIVED
APR 2 ? 19 4
Alaska Oil & (;as Cons. Commission
Anohnr~,,,
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
_ .
.
.
.
NAME Include interval tested, pressure data, all fluids recovered and gravity,
. . MEAS. DEPTH TRUE VERT..DEPTH GOR, an,,d time of each phase. -
.
Top Sadlerochit 10767 ' 8773'
O/W Contact 13_110' 9093,' None '
. .
BaSe Sadlerochit ~Not Reached
31. LiST OF ATTACHMENTS
32. I hereby certify'that the fOregOing is'true and correct to the best of my knowledge
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is cOmpleted for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached-.sul~p. lemental records for this well should show the details' of any multiple stage cement-
ing and the tpcat[oi~ octhe cementing tool.
..
Item 27:Me~b0d 0,f':;'0b'~ration: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in~,.0._ther-explain.
Item "T~ no cores tal~en, indicate "none".
ARCO Alaska, Inc/
Prudhoe Bay =ngineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
April 25, 1984
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
Re:
DS 3-19
DS 3-22
DS 3-23
Permit No. 83-92
Permit No. 83-123
Permit No. 83-127
Attached are Subsequent Sundry Notices for work performed on the
above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/WT/lmh
Attachments
CC:
Sohio Petroleum
File Pi(DS 3-19)W1-3
PI(DS 3-22)Wl-3
Pi(DS 3-23)W1-3
APR 2 7 l°JBa,
Oil & G~s cons. commiSSion
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlantlcRIchfieldCompany
STATE OF ALASKA -...
ALASK, .¢IL AND GAS CONSERVATION C ¢IMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL []
2. Name of Operator 7, Permit No.
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20971
OTHER []
4. Location of Well
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM
334' FNL, 315' FEL, Sec. 16~ T10N, R15E, UM
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
62' RKB, Pad 26' I ADL 28331
9. Unit or Lease Name
Prudhoe Bay Unit
10. WellNumber
DS 3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
[]
[]
[]
13. Describe Proposed or Completed Operations (Clearly sta~e all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170),
Began perforation operation on 4/?/84. RU perf un±t, pressure tested equipment.
RIH w/gun #1, shot 10974-10994' MD, 4 spf (20'), flowed well, SI well, POH, all
shots fired. RIH w/gun #2, shot 10916-10936' MD, 4 spf (20'), flowed well, SI
well, POH, all shots fired. RD and secured well. Ref: BHCS 6/29/83.
RECEIVED
APR 2 7 1984
Alaska Oil & Gas Cons. Commission
Anchorage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ,~_ ~~ _~~ Title Regional Engineer
The space below for Commission use
Conditions of Approval, if any:
By Order of
Approved by. COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc
Prudhoe Bay E. ngineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
March 30, 1984
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
Re:
DS 3-19
DS 3-22
DS 3-23
Permit No. 83-92
Permit No. 83-123
Permit No. 83-127
Attached are "Notice of Intention" Sundry Notices for work
proposed on the above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/WT/lmh
Attachments
CC:
Sohio Petroleum
File Pi(DS 3-19)W1-3
PI(DS 3-22)W1-3
PI(DS 3-23)W1-3
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany
STATE OF ALASKA .__~
ALASK, )IL AND GAS CONSERVATION ( ¢IMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
OTHER
DRILLING WELL []
COMPLETED WELL
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, Alaska 99510
4. Location of Well
76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM
373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM
334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM
5. Elevation in feet (indicate KB, DF, etc.)
62' RKB, Pad 26'
I 6. Lease Designation and Serial No.
ADL 28331
7. Permit No.
83-92
8. APl Number
50- 029-20971
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
DS 3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Descri~ Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit
Sand from the Prudhoe Bay Unit. Upon.perforating, the well will be flowed for
cleanup. All wireline work will be done through a 5000 psi WP BOP/Lubricator,
tested to 1.2 times the maximum expected surface pressure. The SSSV will be
installed at the conclusion of the perforating and clean-up operation.
Proposed Perforation Intervals:
10913-10937' MD (24')
10974-10994' MD (20')
Ref: BHCS 6/29/83
Subsequent Work Reported
on Form No./~ Dat,cl
RECEIVED
Alaska 0ii & Sas Cons. 60rnmissJ0rl
Ap. chorago
.
14. I hereby ¢,~.rtify that the f94egoin_g is true and correct to the best of my knowledge.
The space below for Commission use
Date
Conditions of APproval, if any:
BI t0~l~i[ C. S~lil By Order of
Approved by. COMMISSIONER the Commission
Approved
Date
Form 10403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
· '" -'~ STATE OF ALASKA
ALASKA _.IL AND GAS CONSERVATION C~ tMISSION
WELL COMPLETION OR RECOMI LETION REI:I'ORT AND LOG
1. Status of Well REVI S I ON Classification of Service Well
OIL7i~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2~ Name of Operator 7. Permit Number
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971
4. Location of well at surface 9. Unit or Lease Name
76' FSL, 397' FEL, Sec.10, T10N, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
373' FNL, 139' FEL, Sec.16, T10N, R15E, UM 3-19
At Total Depth 11. Field and Pool
334' FNL, 315' FEL, Sec.16, T10N, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool
62' RKB, Pad 26'I ADL 28331
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. No-of Completions
06/17/83 06/28/83 07/25/83J N/A feet MS LI 1
17. Total Depth (MD+TVD) 18.PIugBackDepth(MD+TVD) 19. DirectionaISurvey I 20. Depth where SSSV set 21. Thickness of Permafrost
l1260'MD,9232'TVD 11210'MD,9185'TVD YES IX] NO []'lNipple ¢ 2201 feet MD 1900' (APPR0X)
22. Type Electric or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL,Gyroscopic Survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
-20" 91.5# H-40 Surf 80' 30" I nstl d w/1990# Pol eset
13-3/8" 72.0# L-80 Surf 2531' 17-1/2" Ontd w/2300 sxs CS III + 400 sxs CS II
9-5/8" 47.0# L-80 Surf 10649' 12-1/4" Cmtd w/500 sxs "G" cmt + 300 sxs CS I
7" 32.0# S00-95 10,369' 11257' 8-1/2" Cmtd w/350 sxs "G" cmt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
NONE 5-1/2" 10417' 10344'
26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
DEPTH INTERVAL IMD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~ 39°I 770
Flow Tubing Casing Pressure CALCULATED OIL:EEL GAS-MCF WATER-EEL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~ . 27°
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
N/A
.
i' '.' I~ ;'~!:~ :~.
Form 10-407 Submit in duplicate
Rev. 7-1-80 DRN/WCl8 CONTINUED ON REVERSE SI DE
.-. - . . . . ,-.~ -
NAME Include interval-tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPI.H GOR, and, time of each phase.
·
O/W Contact 1111 O, 9093'
Top Sad] erochit- 10767' 8773, :
·
..... - NONE ..
Base Sad]erochit ' Not Rea(bed
_
.
...
_
31. LI'ST OF ATTACHMENTS
Drilling History, Gyroscopic Survey (2 copies).
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~,~' ~ TitleArea Dri] ling Engr' Date'O - Z',- 8''~
/ .,
INSTRUCTIONS
General: This form is designed for sUbmitting a Complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference' (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and'24: If this well is completed for separate production~from more than one interval (multiple
completion), so state in item 16, and in. item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
DS 3-,~.
DRILLING HISTORY
'NU 20" diverter and flow line. Spudoed well @ ~600 hrs, 06/17/83. Drld
17-1/2" hole to 2545'. Ran 64 jts I3-3/8" 72#/ft, L-80 Butt csg w/FS @
2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & ¢00 sx Coldset II cmt. ND
20" diverter system. NU BOPE & t$%d to 5000 psi - ok. Tstd csg to 1500 psi
- ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW -
ok. Drld 12-1/4" hole to 10660' (06/26/82). Ran 274 its 9-5/8" 47~/f%,
L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd
csg ~o 3000 psi - ok. Drtd FC & cmt. Tstd csg to 3000 psi - ok. Drld FS &
10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260'
(06/28/82). Ran DZL/SP/BHCS/GR fr/11252 '-10595 '; FDC/CNL/GR/Cal
fr/11256'-10595'; GR to'2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300
sx Coldset [ cmt & 125 bbls AP. Ran 19 its 7" 32,~/ft, S00-95', Butt csg
fr/10369'-1!257'. Cmtd 7,, lnr w/350 sx Class G cmt. Wash 9840'-10054'.
Drld cmt to 11210' PBTD (07/01/82). Tstd lnr lap to 3000 psi - ok.
Displaced well to 9.8 ppg NaCI. Ran CBL f/11210'-10280'. Ran 5-1/2"
completion assy w/tail @ 10417' & pkr @ 10244'. Tstd ~Dg hanger & packoff
to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well
& released rig @ 0320 hrs, 07/03/83.
~-M/OH!9' sm
08/ ~..,
ARCO Alaska, inc. ~
Post Office ,. 360
Anchorage. Alaska 99510
Teiephone 907 277 5637
October 17, 1983
Reference: Arco Directional Data
(RE- DISTRIBUTION)
The following surveys are being re-distributed due to poor copy quality
of the first set distributed. Please replace previous copies with these.
D.S. 3-19 7-8-83 Single Shot EW
DoS. 3-20 7-18-83 Teleco EW
D.S. 3-21 8-8-83 Single Shot EW
D.S. 3-22 8-24-83 Single Shot EW
D.S. 4-16 9-29-83 Teleco EW
D.S. 14-31 8-22-83 Single Shot EW
D.S. 14-32 8-24-83 Single Shot EW
/~iease sign and return the attached copy as receipt of data.
Kelly McFarland
ATO-1429F
Trans. # 563
CheV~ on
D & M
Dallas
Drilling
Getty
Marathon
Mobil
DISTRIBUTION
.Alaska Oil & Gas Cons. Comrnismorl
Anchorage
Phillips
E&D
Caroline Smith
,~ STATE OF ALASKA .' -'
'~' ~' ALASKA u,-L AND GAS CONSERVATION ~ ~VIlSSION ~____
WELL COMPLETION OR RECOMPLETION FiEPORT AND LOG _,
1. Status of Well Classification of Service Well
oILX~] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971
4. Location of well at surface LOC~.TiONSi 9. Unit or Lease Name
76' FSL, 397' FEL, Sec.10, T10N, R15E, UN VERiFiED I Prudhoe Bay Unit
At Top Producing Interval Surf, E -}1 10. Well Number
373' FNL, 139' FEL, Sec.16, T10N, R15E, UM --~ ] 3-19
~$V_~ ?z.-.J~ B.H.
&
At/otal Depth 11. Field and Pool
~ FNL, 315' FEL, Sec.16, T10N, R15E, UN Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Ba:y 0i ] Pool
62' RKB, Pad 26'IADL 28331
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. No. of Completions
06/17/83 06/28/83 07/25/83I N/A feet MS LI 1
17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost
11260'HD,9232'TVD 11210'MD,9185'TVD YES~] NO [] ipp]e @ 2201 feet MD 1900' (APPROX)
22. Type Electric or Other Logs Run
D IL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL,Gyros¢opic Survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surf 80' 30" I nstl d w/1990# Pol eset
13-3/8" 72.0# L-80 Surf 2531' 17-1/2" Cmtd w/2300 sxs CS Ill + 400 sxs CS II
9-5/8" 47.0# L-80 Surf 10649' 12-1/4" Cmtd w/500 sxs "G" cmt + 300 sxs CS I
7" 32.0# S00-95 10,369' 11257' 8-1/2" Cmtd w/350 sxs "G" cmt
24. Perforations open -to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
NONE 5-1/2" 10417' 10344'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
-
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
N/A
l
DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD I~ 39° 770
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~ 27°
2~. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
()C~i' ';i. "-; ":..~ '
Form 10-407 Submit in duplicate
Rev. 7-1-80 DRN/WC18 CONTINUED ON REVERSE SIDE
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR,and time of each phase.
i
O/W Contact 11110' 9093'
Top Sad] erochi t 10767' 8773 '
NONE
Base Sad]erochit Not Real bed
31. LIST OF ATTACHMENTS
I her. eby certify that the foregoing is true an.d correct to the best of my knowledge
32Drilling History, Gyroscopic Survey (2)
/ /' /
Area Drilling Engr.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and Icg on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should shoW the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
~9
DS 3-=
DRILLING HISTORY
NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld
17-1/2" hole to 2545'. Ran 64 jts 13-3/8', 72#/ft, L-80 Butt csg w/FS @
2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & 400 sx Coldset II cmt. ND
20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi
- ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW -
ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft,
L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd
csg to 3000 psi - ok. Drtd FC & cmt. Tstd csg to 3000 psi - ok. Drld FS &
10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260'
(06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal
fr/11256'-10595'; GR to 2525'. Arctic.packed 9-5/8" x 13-3/8" annulus w/300
sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg
fr/10369'-11257'. Cmtd 7" lnr w/350 sx Cl'ass G cmt. Wash 9840'-10054'.
Drld cmt to 11210' PBTD (07/01/83). Tstd lnr lap to 3000 psi - ok.
Displaced well to 9.8 ppg NaC1. Ran CBL f/11210'-10280'. Ran 5-1/2"
completion assy w/tail @ 10417' & pkr @ 10344'. Tstd tbg hanger & packoff
to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well
& released rig @ 0330 hrs, 07/03/83.
CSM/DH19' sm
08/1!/83
ARCO Al ~A'.F.:I.::]A, I NC:.
DS 3, WELL NO: 19 :::IGMA-GYRO dOB NO: A0783RO:.34'F./PZ
PRUDHOE BAY, NORTH SLOPE, ALASKA
SIGMA/GMS 0.-112':10 MB, F-:URVEYOR: ,_IAHN, DATE RUN: 25-dULY-83
:'::IGMA GYRO: 6'27, PROBE: 067
I::'OI:~E'.E; I GFr'F: N:31 14.5E
F:URVEY TAKEN FROM WELt_HEAD
VERT]' ...Al .....:,F.:,_.TION F:ALCUI_ATED IN F'I..ANE OF PROPOSAL '
D I RECT I F~N: '-' 8?: BEG ':"-'
. o _ . ~.:, MIN. W
RECORD OF SURVEY
RADIUS OF CURVATURE METHOD
RUDHCIE BAY~ NOR'TH c,I....Uf-E, AI.ASI<A
,JOB NO: AO78:.-::RO:34'.'.-;PZ
COMF'UTAT I ON
'1' I ME DATE
'/: ' 0 9 3:- O C T -.-:z: :3
1~"--'. (.) ::.. 0
F'AGE NO'.
, ,
:/
TRUE
EASI...IRIED I]RIF'T DRIFT COURSE VERTICAl_ VERTICAl_ SUBSEA R E C: T A N O U L.. A R C: L El S IJ R E [IOGL. E
DEF'TI.-I AhlGL. E I]IIRECTION L. ENGTH DEF'TFi SECTIOhl ; TVD C 0 0 R D I N A T E S FiI'STAIqCE.' .DIRECTION '..3EVERI
F E E T I) M B M F E E T F E E T F' E E T F E E T F E E T F:' E E T D M D G / 10 (:.,
0. 0 0 (') 0 0. 0.00 0. F)O -62. C)0 ('). 0C) 0.0(') 0.0C) 0 0 ('). 0C:,
t00 0 9 rE; 6, 59 El 1(')6) 100 00 -0 (')(') ':":' ¢)0 ¢) 1":' c. 0 ("-' ':' ='"
n , . . (s ,,
....... )z. E (') 1:3 6 .',
2 ......... 00 (') 19 S :-": 1 .1. 1 W .1. 0 C) 2 (')0.0 (') (') 1:3 1 ._-,'":::-. C)(') C)..~_ 2_ ........ ':' 0.07 W 0 . =,z'-'
:3. 0. 0. 0 20 ::,'" d, 7 42 W 100 . .:,'-' O' L)'. 00 0.6., 0 ~.'~""'o c,':" . 00 0 . '"c ............ o ,:. 0 50 W 1 (-') z"" .... c. '.-.'
· 56, 47
4CDL).. ('D. .26 S86 '-"-',,~,:, W 1 (:)('D . 4(:)(') .0(') .1. .27 ._,':'._':::'":~,_. (')('). 1.04. S 1 . 1/.-, W 1 . S ..,,:~ W 0. 1/.'::,
500. 0 ]~':4 N 76. 27 W :1.00, 499.99 1.96 4:37.'-¢y'- 0.'~,9 S 1..:.6 W ? 10 ':'. 62 15 W lZi
600. 0 J. 7 S 87 48 W 100. 599.99 2.51 5:3'7.$~9 0.92 S 2.42 W 2.59 S 69 7 W 0. 12
700. 0 21 S 84 29 W 100. 69'~.'F/9 3.07 637.99 0.96 S 2.98 W 3.1:3 S 72 7 W 0.07
800. 0 16 S 53 58 W lC) 0. 799.99 3.59 737.99 1.15 S 3.48 W :3.67 S 71 42 W 0.18
'F;00. () 1:3 S 18 24 E 100. 899.99 3.75 837.99 1.53 S 3.60 W 3.91 '.E; 67 0 W 0.29
1000,, () 10 $ 6:3 0 E 100. '~:T~'F;.99 3.58 ~37,9'F; 1.77 $ 3.40 W 3.83 S 62:32 W 0. 15
1100. 0 6 S 26 2 W 100. 10':.:;'FY,, ~ 3,,53 1037.99 1,96 S 3.33 W :3.87 '.E; 5'.--.~ 2'.--; W 0.1'?
1 ::.?CPO. () 11 S 6 46, E 100. .1. 1 ~'.~;. '.'.'~.~ 3.60 11:37. '..Q'~ 2.20 S S:. :37 W 4.02 'S 56 54 W 0.1 .1.
130C). 0 15 S :32 29 E 100. 12S;9.?;9 3.39 1:237.9.9 2.45 S 3.13 W 3.97 S 51 58 W 0.2'7
1400. 0 7 S 29 42 E 100. 139'.-.-). 98 3.15 1337.98 2.62 S 2.87 W 3.88 S 47 38 W 0.20
150(D, 0 16 L:; '""=; . .:~,:, ,:. ..........
· ..,._ 10 E 100. 14-.9'~ "'-' o..'Fy6 14.:37 'T;F: ';.' 86 S 2 65 W 3 '-7~('D S 42 4..5 W 0 17
" ="-' ~o ':' 7:3 S '~'. 44 W 3 7¢) S 41 1:3 W 0 2:::i:
16 (')0 (') 2 Iq 1 :_4 "'.":~ E 1 (')0 1 ~ 99 '? ::: 2 74 1 ...,.:, 7. "'-'
.... . .. .,:.... .. # - . . · · - n .,- · J.,. m . ·
17('JJ~).. (:J '?. N iff'-.",,_. .,...9/-.., E 100. 1/t,':'/':7_. . . ¢)o.. ,_, 2: ./',/'~_ 1637 .
1 ~2:J (_') (])(") 1/_:) N :'~ () 4 ~--'~ N 1 (.'.) (_')1 771'.~ '~1J"J 2 _1~_ ,~
......... ,.. 17 3 7. '..-,'
c. 2 '--.'"::
:I.'-}¢D('D ("D 26 hi 38 1(] ...... E lC)0. 1F:'-)'~I '-)::: ":' 42 1837 ¢;::: .1. 76 ._, .: ..... w .:2
. . . i,, .... ,,' n · _ # d,...- ·
....... :2 1937.97 '~'~ 2 S 4:3 S 5'7 1 W ('D 48
2000. ('))54 Iq 48 44 E .1. O('D. 1 o,T; 9 'F~ 7 1. ~ - rD.. 1. W 1.70 '""
2100. 1 50 N 50 14 E 100. 20'?'?.94 -0.45 2C)37.94 0.63 N 0. :38 E 0.74 N 31 26 E ().'FY:2,
22CD0. 1:32 N 3/.:, 2'? E 100. 217'.-.?. 'PC) -2.70 '.71:37.90 2.7/_-, N 2.4(:) E :--:. 66 N 4(:) 58 E 0..5C.)
:;;::300. 1 '.5:7 N 26 'F¢E 100. 22'?':5~. :37 -4.'.--.'?; 22:37.6:7 4.98 N 2:.75 E 6.2:3 N 36 F, 8 E 0.25
24CD0. 1 9 N 28 54 E 100. :2:379.84 -..5.57 23:~7.84 6.'F~9 N 4.79 E 8.48 N :34 27 E 0.:31
2500. 0 4:3 N :34:38 E 100. c.., 4'F;'.-). 8:3 - 6.,. 5:.--.:24. 37.83 8.37 N 5.65 E 10.10 N 34 1 E 0 · 44
2600. 0 30 N 50 .1. 9' E 100. :2599.82 -.7.38 2537.:32 '.-.-;. 15 N 6.37 E 11. 15 N 34 4'Fy E ().27
270(D. 0:35 :E; 84 5 W 10C.). 269S.~. 82 -7. 18 2637.82 9.81 N /_-,. 09 E 11.55 N :31 50 E 1 .(:)4
2800. :2' 52 N 71 11 W 100. 27'F¢'F~.73 -3.43 2737.73 10.24 N 2.26 E 10.4';9 N 12 28 E 3.3.%
2900. 7 '? N 7:3 I 1 W 100. 28'.--~'.-7¢. 25 5.31 2837.25 13. 18' N /_-,. 87 W 14.86 N 27 33 W :3.2'.:..
IRCO AI...A~::F'<A, I NC:.
'S 3, WE[_.[.. NO: 19 SIGMA-GYRO
RUDHOE BAY, NORTH .=.L,JFE, AI_.ASKA
JOB NO: A07:::.3RO:_::49PZ
COMPUTAT I ON
T I FIE DATE
12: 06: 09 O:=:-OCT-8:B
TRUE
' '-'1 '- "1- '""' '-;I I~'-'~''''' .
IEA.:,JRED DRIFT DRIF"r C.JUR.=,E VERTICAL VERTICAl .... :..n.=,~,-, R .E C T A N G LI L A R E: L 0 '.E; I.I R E DOGL. I!:.
-- i-o i i-0 '
DEF'TH AIqGI....E DIRECTION LEIqG'¥H DEF'TH SECTIr"~N TVD C 0 0 R D I N A T E .=, DI:=;TANCE DIRE_.7 ION '..=.;EVER
FEFT 0 M D M FEE'f' FEET FEET FEET FEET FEE]" D M DO/10(i'
:3000. 10:3 ::3 N 88 24 W
:B 100. 1.5 1 ,..,':' ".S 6:3 ':'...../-_, W
:32()0. 17 5:3 S 68 8'W
33. ()0. 19 5.6 :E; /.,:'3 .:,'"1 W
:3400. 24 25 'S 71 ~:.":' W
:'::5¢)¢) --:,o 34 ':'"
......... ~. ...... 7 .... 16W
3/=,00. :]'::C) 19 S 75 :.T: W
:3700. :32. 18 S 75 15 W
:=::=:()C) .... "=' :34 ~'
. .:,..., b 7/.:-, 1 W
:}::900. :37 4.5 ':'._. 75F,_/-,.. W
100. 2998.04
100, :3095.4.6
1 C) 0 ,,:B ]. 91. ::29
1 ()0, 32:E:5, 89
.1. 00. :3:378. 47
1 ()0. 34/., 7.95
100. 3!555. (_')3
10 C). :B/.,40.46
1C)O. 3723.42
100. 3803.64
20. 1:3 :2:936. (34
42. :'-'2 30:=:3.46
/=:,9.4.:3 :3129.29
1()0 -12. '-"-'""'" '"':)
· .=,.~. ~ .=,. ,2, ,.
1:37 :::9 '-"-' .
.... :,o16 47
181.27 ::-:405.95
229.92 349:3.0:3
281.3:4 3578.46
336.65 .'3661.42
395.84 :2:741./..4
15./=,4 N 22.08 W
10.84 N 43.77 W
0.87 S 69.8(") W
12 ""=' -' 99
, ,:,.., '.:, , 'F.' 1 W
25.88 S 135.31 W
~'l ~ i
· :'~,· c,.~"¢) c'
51.40 S
64.72 S
78.57 S
9:=: C) 4c.
27.06 N 54 41 W
45. C)9 N 76 "~... W
69.8C) S 89 17 W
0 0.7:3 ';=; ,=,.~:, 4,! N
:3 '7.7'7 S 79 1(:) W
177.9'-7~. W 1 :::. 2.17 ':',., 77 4.,:."' W
225.50 W 2:31,28 S 77 10 W
275,72 .W 283.21 "._=; 7/=, 47 W
329, 7'..;' W 339.02 '.=; 7/=, 3/=, W
7'::,:;:7 70 W
.... ._-,.-. ~,, 71 S 7/-', 30 N
4000. :39 44 S 76 12 W
4.100. 42 2C) S '76 4-:2 W
420C). 4:3:3:2 '.'":; 7'7 4 W
4 300. -1,:} :=:7 '.=; 77 10 W
44C)0. 4:3 26 S 76 47 W
1 O0. :388: :L. 63
100. :3957.06
100. 40:30.27
100. 4102.72
100. 4175.23
~ 9 ...,8 9 6:3
4._7. 1 '"" 1 ·
523 ,. 07 3895 ;, 06
590, 75' :3968, 27
659, 26 4040,72
727.70 4113.23
108.11 S 448.44 W 461.29 S 76 :;;'7 W
123.49 S 512.2/-, W 526.93 S 76 27 W
138.95 ,.E; 578.59 W 595.04 '.3 76 :::C) W
154.31 '.E; 645.78 W 663.96 '.E; 76 :':-:4 W
169.83 S 712.88 W' 732.83 :=: 76 36 W
4500. 4:3 36 S 76 45 W
4600. 4:2: 7 S 7'7 14 W
4.700. 42 :::3 :E; 77 7 W
4:300. 42:30 ,.E; 77 4 W
4900. 42 51 S 77 20 W
100. 4247.75 796.08 4185.75
100. 432(:). 45 864.31 4258 · 45
.1. 00. 439:2:. 79 931.90 4331.79
100. 4467.49 999.08 4405.49
100. 4541.01 1066.48 4479.01
185.61 S 779.89 W 801·67 S 7/=, :37 W
201.(:)6 S 846.78 W 87¢). 32 S 76 39 W
21/.,. I s._ S 913.08 W c~.. -=,._, o,_,.._,~-' 1 '.-]; 7/., 4. 1 W
2:31.25 S 978.96 W 1005.90 S 76 43 W
..4:,'-'/. 26 c.._, 1 ('). 4.'=;_, C) 6 W 1 ¢)_ 7:} .69 c.,.., 7/., 44 W
0.1'.;
0.
0.57,
r,
500C). 4. 2 52 S 77 41 W
5100. 42 2':.) S 7:--: 54 W
52(:)(-). 4';:' :'~:=: '.3 79:36 W
5300. 43 4 :=; 8C) :=:/.. W
5400. 4:3 ].9 S 81 54 W
100. 4614. :31 11:34. 15 4552. :31
100. 4/.,87.83 1201.66 4625.8:::
100. 47/-,1.54 1269.06, 4699.54
100. 48:2:4.90 133/... 90 4772.90
100. 4907.81 1405.30 4845.81
260.98 S 1111.48 W 1141.71 S 76 47 W
274.73 S 1177.85 W 1209.47 S 7/., 52 W
2:37.34 ~E; 1244.24 W 1276.99 S 77 C) W
2$/9.(i)2 E; 1311.18 W 1344.85 S 7'7 9 W
:3(])9.43 S 1378.83 W 141:}. 12 S 77 21 W
0, 2z
0.9:
C). 4:i
i-'1 [
C). o.,
0. '.-.? :,
5500. 4::: 31 '.:.; :::2 41 W
5/=.00. 4:3 4C) S 8::: ](} W
5700. 4::: 42 '.--_; 83:35 W
58C) 0. 4.:3:3:3 S :3:3 5:3 W
590C). 4:3 2f:: '._:; 84. 12 W
100. 4980.45 1474.02 4918· 45
10C). 5052.87 .154',:'.. 96 499(3.87
100. 5125.19 1612.06 5063.19
100. 5197.53 1681.12 5135· 5:3
100. 5270.01 1750. C) l 5208.01
318./=.5 .S 1446.94 W 1481.61 S 77:35 W
327· 14 S 1515·36 W 1550.27 S 77 49 W
3:::5.12 c.._. 1584.¢).C). W 1619. .¢).6 S 7:::. 3 W
342.65 S .1 652.65 W 1687.79 S 78 17 W
349.81 S 1721.17 W 1756.'='._,5.- S 78 ._,':,1 W
O. 5'
C). 3]
0.2'
O. 2:
0.2'
· ~CO AL. ASEA, INC,
._.'=' 3., WELL NO: 19. '.::;I AMA-PiYRO_ _
· ~LIDI"tOE BAY., NORI'H SLOPE, AI_.AS:;KA
dOB NO: A0783R0349PZ
C 0 M P U T A'T I 0 N
T I ME DATE
12: 06: 09 0:3--. 0 C T- :3 ::ii:
PAGE NO'.
EA'._::LIRIE I')]"~R I F'I" I:)R I FT
DEPTH AI',IGI_.E DIRIEC'TION LENO'FH DEF'TH
F'E E"F KI M 13 M F E E'[' F E E T
TRUE
C:OUR'..:;E VE:'RTICAL VE:RTICAL '.:.~;I...IB'.:_;EA R E C T A N G I..I L A R C L 0 S U R E DE, GL[.
:3ECTIf/N TVD C 0 0 R D I N A T E :3 DI'.3TANCE DIRIiECTION SEVIER]
FEET FEET FEEl' FEEl" D M DG/10(
6000. 4:3 ,54 S 84:36 W
61 ('). A.. 4 q. 12..,':' ,:,'-' :~...., ..,':' W
6200. 45 19 '.3 85 17 W
6300. 45:34 S ,: ..... o.:, W
64C}A 4/-, 17 ':' ':"q ~9 W
./:,5()c~. 4./:, 15 S 86 15 W
660(). 4'7 :3 S 86 '2'4 W
67()0. 47 11 S 87 7 W
6800. 47 3 S 87 4'7 W
6900,, 47 17 '.S 88 1 W
7000. 4'7 54 S 8'7 0 W
'7100. 48 30 :E; 8'7 0 W
7200. 48 42 '.3 87 0 W
73 ('~.. A.. 48 54- ._,':' 87 (-~. W
7400. 48 48 ::; 87 0 W
00. 5:342. :32 1819. (37 52:3C) ,, :32
00. 5414.20 1888.57 5352.20
00. 5485. :::'0 1958. ','35 542:3.20
00. 5:']55.37 20:B0.16 5493.3'7
00. 5624. ',~3 21 () 1. '.:~4 5562. '?:3
356.55 S 1789.91 W 1825.0'7 S 78 44 W
:.3.62.82 S 1859.15 W 1894.22 '.:i:, 78 57 W
:368.7.5 S 1929.._.~"" 1 W 1964 . :24 '.'_-'; 79 11 W
374.44 .S 2000.:34 W 20,35.08 S 79 24 W
:.379.75 S 2071.'.'38 W 2106.49 S 7'.-? 37 W
100. 5694.04 2174.09 5632.04
100. 57/:,2.69 2:246.72 5700 ,,/.:,9
1'00. 583(). 74 2319.87 576:-]:. 74
100. '.5898.78 2392.9'7 58:36.78
,l 00. 59/:,6.77 '..:'4/:,6.07 :5:904.77
384.64 S 2144.06 W 2178.28 S 79 50 W
::: 8 q? :::A '.--; '-'"" .......
~z. 1/-.. 63 W 22.~A
........ ._..:, :_:; :.:.!:C~ 2 W
· ", ,- ", "], '%, 0 ~ W
.:, .'.~..~, 44 '.3 79 W '-"-'"'"'
. z..:, z.._', .':':5 '.3 f-::~'~ 1
.~:...C. '.' ..' , -- . '...
:39/:,, 70 S 2363,00 W 2:396,07 S 80 28 W
399, :39 S 2436, 28 W 24/_-,'.-]:, :::0 '..--.; :::0. 41 W
. ..
100 60:34 ':' --~ -.~e - .=,, o"7._-, ,-, · .-,: .-
, .~ 1 ~. 5...9. 72 .- ~--,. .~ 1 402, 60 :--", ,:.., 10 .04 W 2 ~_ 42 . 1 .:: S 80 =._,.:,'''' W
100. 6100.86 2614.11 6038.86 406.50 S 2584.49 W 2616.2/:, S 81 4 W
100. 6167.00 2688.~T~8 6105.00 410.4:3 S 265~.40 W 2690.88 S 81 14 W
100. 6232.87 2764.07 6170.87 414.36 S 2734.54 W 2765.75 S 81 23 W
1 AO. /-,29A 67 2:R:::9 21 /-,2:~/-, 67 418 31:3 ~' '~'A
. . . ~,:,.; 7:3 W 284~] 70 S 81 '3';' W
0. '5 ]
0.4.::
1 ,, 1.
0.3:1
O,
) 2('
0.8 ;I
0.54
0.5:1.
,~:. ::
0.9':;'
0./:,(:
0.2C.
0. '2('.
0. 1 (:
'7500. 4-'.-? 0 S 87 30 W
7600. 49 0 S :38 0 W
77 ('). (). 4.9 1..'-' '._:; ,_,° c,,_, :::_ C)_ W
7 :E:00. 49 0 :--; 8:E: 0 W
7900. 4. 8 ?l_ 4 '.--; ,_,c:,..,° :-::_ ¢). W
100. 6364.4.1 2914.40 6302.41
100. 64:30.02 2989.65 6:368.02
100. /:,495.49 :3064.9/_-, 643:3.4'.-?
100. 6560.96 3140.28 6498. ?6
100. 6/:,7.~6.6:'_-: 3215.42 6564./:,3
421.92 S 2885.00 W 2915.6,9 S 81 41 W
424.88 S :...-...'9/:.0.41 W 2990.74 :3 81 50 W
427.19 '.3 :3035.'?/:, W :3065.87 S 81 .=_;'Fy W
429.50 S :3111.52 W 3141.02 '.3 82 8 W
4:31 F:(-~ 8 3186 F:9 W 3216 01 '-' 82 17 W
. -- . , · - · ._1
0.4 ::
O.
0.4
(:). 4::::
):3'.'-.
800A. 49 0 S :38 0 W
81C)0. 49 2:4 L--; 87 0 W
8200. 49 30 S 87 0 W
::: .... F: (') C) . 4'.-? :::_ C)_ '._--; ,_,o/._. :::_ C) W
8400. 49:24 '._:; 86, :.7:0 W
100. /:,692.30 ' 329(.'). 56 66:30. :30
100. 6,757.6,5 33/:,6.0/:, 6695.65
100. 6822.65 :3441.89 6760.65
100. 6887.60 3517.80 6825.60
100. 6952.61 :359:3.67 6890.61
434.10 $ 3262.27 W :3291.0:3 S 82 25 W
4:37.40'.:: 3337 .9 (:) W :::_ 366 .4:3 S 8'.---! 3'~_':" W
441.38 S 3413.77 W 3442.19 S 82 3:3 W
445./_v.--y S 3489.6'? W 3518.04 S 82 43 W
450.33 S 3565.53 W 35':33.86 S 82 48 W
0.
0.
0.1 (:
C). :~:::.
0. 1 (:
:E:500. 4'? 30 S 86 0 W
8600. 4'.-? :3C) S 87 C) W
8700. 4. 9 1::: '.:_; 87 0 W
8800. 4.'? 12 '.3 86 3C) W
8900. 4.9 12 S :37 0 W
100. 7017.61 3669.56 6955.61
100. 7082.56 3745.48 7020.56
100. 7147.63 3821.26 7085.6:--:
10C). 7212.91 3896.88 7150.91
100. 7278.25 :3972.45 7216.25
455.30 S 3641.35 W 3669.70 S 82 52 W
459.94 :_--; 3717.2.5 W :3745.59 S :::2 57 W
· .-,-7c;.-, 07 W 3821 3:3 '.--; ::::---: 2 W
46 3.9 2 S .:',..~ .:,. ·
468.21 S 3868.70 W 3896.93 S 8:3 6 W
-.
472.50 S 3944.27 W 3'.--772.4.7 S 83 10 W
O. 3!
0.7,'.'
O. 2(
O. 3':
C). 3:!
RCO AL.A:2;KA, INC.
S 222., WEL. L.. NO: 15) :E;IGMA-GYRO
'-' I-I -'
R U D H 0 E B A I/, N 0 R'¥ I.-I ,=, L ,. F E, A L.. A'.2; K A
C:¢IMPUTATION pAGE NEi.
_ . o.:,RO,:,4 ;YF' Z T I ME DATE '
, lOB NO: A(")7'- .....' '" '-"
12: 0/=, 09 - .-, -p _ c,..::,
' : 0._-,-U ... T ........
iE A'..=,;UREI.] DRIFT DRIFT
DEF'TH ANGLE D I REC:'r ION LENGTH DEPTH
F E E T D I'1 I) I't F E E"I' F' El E T
TRUE
COURC.;E VER'rlCAL VERTIC:AL SUBSEA R E C T A N G U L A R C: L 0 S IJ R E I)OGL['!!
SECTION TVD C 0 0 R D I N A T E S DISTANCE D IREE:TION :.'-;EVER];
F-'EET FEET FEET FEET D VI DG / 10(
100. 734:3, 72 4047.88 7281.72
100. 7407..9'.P 4122.6:3 7347· .99
100. 74.77.8/=, 4 t 95.91 7415.8/=,
100. 7547.95 42/=,7,09 7485.95
100. 7/_-20.49 4335.75 7558.49
'F/500. 41 18 S 87 0 W
9/=.00. 3 9 0 S 87 0 W
?.'~700. :38 12 S 2227 0 W
9800. 236 30 S 88 0 W
'.:.~900. :35 () N 89 0 W
100. 7694.92 4402,3:5 7632.92
1,00. '7771. :35 4466.70 7709. :35
100. 7849.50 4528.96 7787.50
100. 7928.99 458'2.47 78/",6.
10 0. 222~:~ 10.14 4 64 7.5 6 7 94 8.14
10000. :3:3 '-
4.z, N 87 0 W
10100. .:,'-"-'~ o. N o_,'"/- ¢;_ W
1 ('* 20 ..... ¢~. :,] C) 4-'.2 N ,=,'-'._, = 0 W
100. '-" '- '-'
,=,0 .-.L,=. 6,9 4703.38 ,_ vo., ,~'"'"P. 68
~ 1 '-'114 66
100 ,~176 66 47~,6 o
1 O0. 8262.06 4807.o'~ o~,.'~ ~'")'",.,. 06
476.46 .., ¢' 4019 .76 W 4047. '? 0 S '=~,....,'--' 14 W
4.:=:(') '-"-' . ._,._ W 41 .... ' 6..3 '.=; '"'-' 1 '~
.... =,c:, '.E; 4. 094 '= ~ ~ ~. ,=,.=, W
484 '"'-' '-' . ....
. ~ ~ .=, 4167.88 W 419 ~9 91 S o.'-'""~ ~ '~' =":' W
4237.'~¢6 S 423'2.10 W 4267.0'2 S 83 26 W
4'20.96 S 4307.87 W 4335.75 S 8:3:30 W
1.0('.
1.5(;
2.0C
*2'. 12
4923. ,=,~'v. o._, 4374 · 5'F7 W 4402. :38 S 8:3:34: W
497 '-'= '-"-' · ,::,.:,
. ..' ._, '.=; 44..:,c,. 97 W 44.66 74 S '-'"" :37 W
50¢~. 51 S 4~¢~1 .27 W 4R29. ~')'2 c,~' ,_,.-,'="=' .:,~""- W
5023.16 S 4~A1.88 W *~,-,,:~ ~i~ c. 8:3 42 W
~ )
~¢)~:. 67 c- 4620...::C W 4647 67 '.::, o.:,'="-' 47 W
5¢~1 70 "' 4676 72 W 4702--:. 55
.. . .: .... :2; :2::2: W
4~,'"' '"'" '=-' 4 7 3 0
· . C,. ~,'-' ,., . . ._, ,--,.-, W
4,=,t ,.., ~3 :2;84 W
494. :30 ._,c' 47 o..'. 76 W '-' '~ ''-~ . ,-'*',
1./=,:iii:
1.8:7
1 ,, 4.(;::'
:L0:-':00. 2:22 48 N 82'-: 0 W
10400. 27 0 N 22:0:30 W
:L0500. 25 42 N 78 0 W
10600. 223 0 N 76 0 W
10700. 21 230 N 75 0 W
10800. 20 46' N 76 0 W
10'700. 20 4,2 N 77 0 W
100. 8526.86 4942--:. 86 84/=,4.86
100. 8617.95 4982.6'2 8555. '25
100. 8710.50 5018.01 ,'-_-:648.50
100. 880:3.77 5051.6'7 8741. '7'7
100. :-} :.=.: 'F. y7.2:3 5084.94 88235.28
474.12 S 4922.01 W 4944.7'.P S 84 :::('~ W
4-6 4.8!5 S 4'2 6 2. 1:3 .W 4 9:2223. 'Fy 0:2; 8 4:39 W
455.37 S 499:2:.:2:23 W 5017.523 '.:!; ::::4. 48 W
446.34 S 5033.76 W 5053.51 S :2:4 5/=, W
· ,~ )/-,,-,. 22 W~ 0 o 7 12 S :::: ~
4:38 (-~/-, S '=" '-' 4 W
1.71
2.82;;!
1.5~f
('). 7 5:
} :3 }
1100C). 21 122 N 77 0 W
11100. 22 1222 N 7:-]: C) W
11150. 222 1'2 N 72E: :.-.20 W
1 ()0. 8'.'.-"':-.Y(:)./=,7 51 1:3./=.2 :::'F'28.67
100 9r):::3 ~.~ 5153 /=,3 o¢).':, 1 ~
· . . -- · '--'.. m .' . -' · ._._
5 C). 9 t 2 9.83 '-5171./_-.0 '?C) 67.8 3
4230.02 S ~I023.06 W ~1'21. 15 :2; :i35 11 W
4- 22:. 00 S 512229.2 4 W 515/=.. 523 ..2; 2225 :!, 8 W
41:2:. 14:3 515 7.7 7 W 517 4.6'? ,.s; :35 2 :;,:-: W
0.5(;
1. 1,'~
0.4.5
:'RO._IECTED TO F'BTD
:'RJ3,JECTED TO TD
F 11'4 AL CL O:SURE -- D I RE C T I OIq:
El I STAFIIS E":
S,:,'-',_, '= D E r'~::; 29 M I N ::2; :31 S E F'. S W
5:214.6:3 F E E ]"
ARC(] AI_ASKA, INE:.
D'..",-;; 3., W I:":: L L N 0. 1 '."} '..:.'; I G M A -G Y R 0 , I0 B N ,-~: A ~..) 7 ,.-., ..:, R (..)..:, 4..~ F/.
PRLIDHOE: BAY., I',IORTH SL...OI::'E, AL.A'.=;KA
'.iii;IGMA/GMS 0-.1:[210 MIl, SURVEYOR: ,..IAHN, DA-f'E RUN: 25-,_IULY-83
S I ~:4MA r-.~YRO -' 6 ....-. ?., F RU£ I::.. 067
I:::'ORES I GHT = 1',!3 ! 14.5E
SLII:~:VIZ¥ 'TAI<EI~I I='ROM WELLHEAD
REE:ORD OF INTERPOLATED SURVEY
?~..']:O AI_A.::,I':..(~-, I r,.IC.
~.: 3: W E I_ L~. N ('.) .'. 1 ,.:7; '.=: I G Id~.-G Y R O
· ~I...IDI-IF'tE." BAY., NORTH '.=:LF~PE.., AL_ASKA
...I0 B N 0: ~ 0 7 8:3R('):34. 9P Z
"f=i ....
F' ~ ,.: E NO ]
..................... M AR K E R .................... 'F RI_IE SI._IB'.::.;E ~
...................... C:ODE ................. MEASLIR[=D VliERTIC:AI_ MD-TVD VI.:.:'RTICAL R E C: T A N G LI L. A R C L. 0 S I.J R E VERTIC:AL
........................... NAMIF ...................... DEF'TH DEF'TH DII=F DEF'TH C: 0 0 R D I N A T E S DISTANCE DIRECTION THIE:I<NES:.:.'i:
F'- E E'f' I::' F'. E 'T' F E E T F' E E T F' E E "r F: E E"r D M
r 0 P :i:'; ~G I:;: I V E.:. R
I" 0 F:' .'.:i; H U ]:31_. I I<
F 0 F' S A D L E R 0 C H I '1'
I' CI P Z 0 NE .ii:
41Er'r
'1"0 F' Z 0 N E,,:'"'
3 / W r-: 0 Iq'l' A i,-..:"l-
1 C) 6 5.4:,. 0 C) 8 6 6 9.7 :F: ! ? :3 6.2 8 6 0'7 ,, 7 8
1 () L-.:=39. C) C) 87 C) C). :'.ii: 2 .1, '.-} 8 8.7 8 L, 3 8 ,, :32
10'76'7. C) 0 8'7'72.9 9 1 'i..') 9 4. C) 8'7 ;t 0.9 9
10968.00 8960.79 2007.2 8898.79
i 10:2:0 ,, C) 0 '? () 18.5:3 :.~ 011.5 8956.53
I 10 :E: 4. C) 0 9 C.) 2:2 . ..-'-' ='...,, 2 C) 1 1 · 8 :=: 9 6 0. .,.9 5._
i 1.110. C) 0 9(') 9':' '::' . .......
.... :_. ,.., 1 2 C) 17 ,, 2 ':.)(3:::("). :::~ 1
4 5 9...4':i ._,':' 4. 9 82' .71 W
4.=~/' 4.1 '.B 4 994- ':'0
449. :32 'S 5022.24 Id
432.59 S .=~C)91. '.-':~ 1 W
42'7.61 S 5113.91 W
42'7 '-.""=¢ '" "'- o6 W
..... :, 51 1 ,-,. '-'
4 21.23 ._,':' .=i.. 14,..-. 9 4 W
i.::. - # .'"'1 i'"1 I'"'
,.J (..) (.) ..:, . ,:,,_, S ,:,4 4 4. W
· .5C) 1 5.61. '.=; 84 4. 7 W
5042. :2:C) :=; :F: 4 5:3 W
": ...... ~) W
.... ,110. '"'"' ::, ::: 5
,.._1 .. .
51:31.7/=, S 85 :l:3 W
ALASKA.
WELL ND
A- C.,., Y ~ i.l]
VERTICALI PR JF_CTI[OII
E~O, ~LE I :Ill. - ~000 fEEl'
. . f
DR
I
,
........ ..... : RECORD
fl:O AL A'.:i;I<A, I I',IF:. ." .'" . . :. :,.
·
RUDFIf)E BAV, Nf]F<TH SLFJF'E
~R,t=E<: ............................................................ :: .................................. = ...................................... ;7:
E:ASURED DRIFT DRIFT I-:FIIIRF:;E VERTI_,AL VERTIF:AL SI.~I.P,'.E;EA R E E: T A N .[~'..I.I L. A R C L 0 .c I_1 R E
~ - ," ,, D (] r,l
LiEF'TH AFIGL. IE DIRECTION I_ENGTH E.EF.¥H SEC:TION TVD.' C 0 n R D I N"'.:..~'.' T E S DISTANC:E IREC:TI SE:VE.F:
FEET D ...... H D F:EET .................. FEET. .....................
· . .. ,.. ; , ,. '
¢3 O O () (] '; ... '(3 0(') O C)O -/-,? ;. C)O O. 00 ,:.,O. ¢"~("~
· -' "" 1 .I. W
2/=,'.-.-,7 I .1. 5 F-; /-,/-, W I Pi'2 ,2/-,9/- .; '-.-*¢* I ....:-,
, -- -- .... · -- .. -J .... , . · -.. .~. # ..
· =, ,.;,.o I':9'. '=' <' "" ~' o.::, . i I Pi S "i, 7 "; ':'"
"':"="='0 4 F;O N 75 W 12 ..... 7 63 ..:.7._,7 ,_,,.- . ' ,., W
· -,/-,.,...., ":' 1 (") 74 W
..... ~ ._., ..
(387 :.3 ;; ' :37 (') :'.-.'; "75' H
4.(")58. 41 15 S '76 W
46.4:2. 4:':: ("~ '.:i; 7 5 W
5168, 4,3 0 S 79 W
. _ ='i '-.'/.
F'; 6'P 4 44. (') '.B ,:, 4 W .... ~. :,.
./.-,255, 4.5 4.5 S :36 14 561,
,f::,75C). 4'7 :=:0 :.:!; 8,/:. W 4".-';'5,.
72'.P ("). 49 0 :--: 86 14 ..540.
'7807; 49 (') N 90 · N ..... 5 .1. 7 ~
.... ¢':. ':"."a ~- .- · '.m' ,
· "', ".,:i'..'..:,.;Y,.¢ i- 0"') ', !'1~
~ , , .,~,cI _ , , .. ~ .,,,~ ,, ~f ;
~ ,-I~ ..~ ,';; *~;t , ,,-~.-i~. "ri ;'~;
,, .,,, ,:,¢~ . . ,
. ; .,
.
Fi; '~,~'-.
1.;._,. 29 ~/-,09 o->
~ ~ ,~ ~ ~¢ . .. . .
,~ o/...h,;. 77 2:364 ,' ¢~/-,
· ._ *_* ..J .~, ~ .~ ~ . - -
62.22 ;' :33 :2767.30
, ~
.] ".
;:¢'=""' ' ~ :3576 04
6; .~'Z~.-.~ -.J ~ -
727 ! ~',71 :3975, 2. 6
7527.40 4:247, 90
7;?..17"L._,c' c,.... 4 .... :. 7 . 9. o..
8:3,p 4 ~ 4 9 4 8'P 0, 2 6
... '. .:.'
. . ·
:qA30:~ c":',_.._,499'~ , N:/-,_ _
'P 181'~ 06 ~22':~, 87
8:36, 5. 4.'? :3 0 N ? 0 W 5!58.
"'"-"-' ~ 49 (') E; A':,, W Pi:'~
,::, ,=, .'.-....m ~, .... . · _ ....
'.:.')2'70. 4.5 ('-) N 90 W :3'75.
9789. :37 30 S 89 W 517.
.1.0620. :2:4. () I',1 7:3 W 2/-:.:'-':,,
.1. 1.220~ 2:3 () N 80 W 60()~
"' R' 0 ,...I E r:: ]' E D
1;126(':). :;!::3 0 N 80 W .4. C).
..
F: I I',IAI._. CI_.OSI_IRE .... L) I F;.'.I!=_' C'T I Cml:
l-I ]' ':::; "1" A N F' F' '.'
,.
';::942,_,':":',_, :'1 . 20. N
:':: 0/-.:.-.4 ~:' ?;/., /., ,. ,:,
........ ,,.. :1. '.E;
'=' 1 F,/-,; 4:3 .1. q 50 o
._. _ _ .,. i~ -..'
'=' ":'/- ':' ": :R':¢ ' ':' ~ ':~ '=
.... · .._.,_,. .... _ ._.._..".._, S
...... ' 48
·
.,
· "=":'. 36 W
"1.~1,"). :=I'=' W
i.I
,"%. I ~
,.-..- ~ ......
!'.2;.-_.'.:24 14
,.~ ,;. ,:=, # .
....
...
· .
~ ,rr .?.:~.1,4:..?..,:.~,,.~,~ 7..-, .S4.._, ,544. :..-.':4 W
~ "~ ',';' " "" :A
';:,,~:/. ;'S ' ,p.:, ' 1 :::'=././', l.-, '.:; ~i:.49Cl ':'0 W
._.1 -"-'" · '-~ ,.~· ....... ~',, - I! ' ~ '," '-' '
ilh~ ,.~ .,,,~ ~,~4 ),,,., ,' ~.~ ....
",'" "- , , ' "~ ~,~i'',~ ,'%'7¢ ',~$ ~' ~ ,' ~j
~0.
()Fl
~.: · , ,,,~- ,. .~ :_ ',: ,~_ '. .~. . . ...¢/ ...
5(.'.)/_-.3, .;:_'9'
5460; 8:3
5800., 77
./...-, 160. :3:3
64'?'.;', 52
, . .
92 i 7.;, :_=:8
·
·
_ ..
5 2: :2::3, :=:.=.5
/-:, :~:/_',:3 ': 75
72C)9, 71
74/:,5:~'40
~,-., r..- ~ .
7,=,._,._,:, :2::'::
,-.,.-,.-.,.-. · ,3..=/
,_-,..~ .~ ..'., ..
.,
E: 54:. 8.8:2:
'.:.) 11 '? .: 06
.,
' .
' S :iii: '= DEF.~S 48 I'11 I'.IS
":'i".;' 4 ":~ ' ~!.~ ":: I:::' F= F:' 'F
.'2_-:'71 '::'/' :'_-.'; 1'~'7'7 48 W
.. :35 :L:; 1'77.1.,76 W
4. C.) 6 ,.
4.:31,4.:% '..:.!: '-"~"'~- _
.-:..=.,:.(.)./-,'7 W
459.=:= 27:~ ..., .... w
...... , '.~; .: ~2. "-' '--
..
478,-.1.7 S :3i22, 41 W
.,.
,.,
473. t 7 S :3.54.5..1.:3 W
47/_-,./.-..7 .S :39'Z~/=../.:.2 W
47'?. 0'7:3 .62.'.t'o, 81 W
4E:2,05 S .I..:,6..-.. 7..5., W
4,1:2..'. 07 :--; 4 .-..,:, 1 ·
·
'"'= - ~-'-" 4 W
:386 ~ .~ ....:~ .... ,:-.1. ,
. ,.'
:.'. ,
:38:3,54 S 52:29,. 4-9 W
:
O. c)() (') C)
(). OC) 0 ()
1.6/.:. :3 6,/.::,(') W ,
7. /-,.. '='..., :E; ,..,'::' .1. 2: .1. Id
17.4.9 1'4:3 '7:2 6 W
'="=',3:3 N :37 '"' W
........ :, 7 Zl,.
./-,0, '77 '::' '='":'
87.49 S 77 7 Id :3.
1 2'7.4':F.: S '7:3:2:'7 Id 2',
16,,'.:5,. :3,'.5 S '7 2 5 4. W ' E, ,,
2!55,01 S 7:3 1'7 W
'""'= '=' _ '=:' %" 4
..::,.,%,/-,0 ._.,7 .... 3 W
· 51 (). ';?. 7 S '74. '7 W
90.1..91 S 74. 4.:}) W
.1. ;7'6,(:)~ ::.4'7 :::4"':- .,:.:,: W
16,2:0.'71 S 76, zt4 W
'2 c) 1:7:. 19 :F: 7"=' '"'
....... : .... :. 1W
2 :]-;70. ;7."7 S '79:31 W
2:: 7-/0.9:2 S 80:2'.'7 Id
;-=:1='-, .
,_,o. (')6 :.:.; 81 5:.':3 id
:3.5'76.. 5'7 :5; :5:2 2 4 W
;3975 :=:~"~ '.=; '-"=' 7 W
~ _ . ,:),_' .
4;247.91. S :3:3:31. W
~... ,~ ¢% .....
4..:,,:,,:,. 14 :=; E::]:: F';:::: Id
4891.2:'; S :34:32 t4
._.,.,::.4..",. F';.. ,_., ._%
().,
(").
0,
0 ..
O.
().
(]).
1. ,,
, .
], ,,
('.).
(').
7.::,[iRIE'T C:HART"S RELA'I"E[~ DA'f'A FILE
· ,.,
..
'..
URVEY FIL. E NI..IMBEF~ .1.76:3 .'
- .
·
·
·
BOTTOM HOLE: ASSEMBLY
VALI..II:':i:'.:; I_ISF-D FEiR.".]BEPTH ARE MIl
,..
DEF"I'H
. .
2545.00
414. ?. 00
'7,9 ? ~:":. 00
8971.00
10660.0('~
DAY
1
2
4
6
7
8
.1. ~'~
1:2
1- I-4 ':' ' ~,'¢'"" }:' '""" .... ' ~' ~ .... ~ ~i'¢" ' ~I~ ...... ',~', ~',7% ,' ~ ,~,~'*,'!~B ' """
,.,:,~ ~:~ ,.,,,~;~; ,. ,., , ,~., .... , ..; , ,. ~,~:,,,,
~,~ ,, ,[~ : . .~ ........ ,,, ~ ' ,2;
. ,' . ~, · . , .; '
· . , ~ ....
. ..,., ·
.~ . .,,' .,
.
. . ,
DR Z L.I. ~ NG D~YS "~"'::'":":'"'"'""
.,
WI_LIES LISED FQR'.DBPTH ~RE ND ... '
.....
.',,.
............................... ~.L _~t'_ ...... : ......................... . ..................... T.:: ........ '
DEF'TH
25 4 %. ~]~ 0
.,::._.,'-~.._, · O C)
3126. ("~c~
4640.0
6445.00
78 ? 8 · 00
E'.'? 71 . 00
.-- ........ .,. O (')
0660 - 00
0660.00
0'? 20.00
J. 26 (]), 0 ()
WE I GHT ON BI"I'" " ,: ,'..:
W E't' 6 H T--}~--~ G .t-V .F.~.N:-.' F'E R J ":~¢;~"~ "' F' ¢'11. IN D ¢4 : ........ ;..,..: ......... .- ,.::
· ,
VALI..IES I I.'::;I.::T.D F'CiR',',D~I::'TH ARE MIl
. ' .':':. ~ .... . .;..
;,,,~ ......... ~. ..................................... ~ ~-: ...... ~ .;
, . ..
DEF'TH WE I GH'I- ': .... ... .. '
·
,.,
1 :.?.: 25.0(-~ 6, 5.00 "
· --i ~ [- ., : · *"
,::..', 4..', (:) (") /", (') () () :"' ': :
· - # # . - . # . . ':.' ~. · ,':.
'-"- 00 ~,~.. 0(} '::: : %.....L ~, .
:l 0660. ()C) 4. 0.0 () "',., '" '
, ,' . ..' -,
112/_-, 0.0 () .50.0,.':) ." ! . , : '
.,
· . . ,..
. ."('"':'"": . !.' :
· ! . ' ,,.."
REVC'I_UT I C'~ ].: ~'ER' ."MI N.O.1"E ~" "" .',' '" ' "
~, . , · ~,~,;,:,,,, ' ,' ~'; ....... ~ ..... ' ,~t~,z ' ' ·
US~'".?,.'~.UR.....'DE'",,~'.I'..~'bu ~ hi,!,~ ~. ' *"'~'"'-' '"~: .... ,:~. ,.. ...... ~..,,~,:, ~,,,. . ....
,~ ,'&"",, ,: .,~
~"~;':~..~ ,,.,'!":~.,,."':'~ ... .: " t~/~:]/~:, ;F: .<'::;? ? ~:~ ."~,.~ ¢:m ~:.:',', '?% .,~'~ ,U ~*?:" ,6>'i;?, ~'.:.i'i;iii'
' :S:;i?,'../i;'~ .. ,;. ' ' i~ ~ '" ''''~'' r~ ~.,% ' ~., '. ",,,. ~ *",' ':' r~
DEPTH
R.
1 :-.4.',':'%. 0 0 ' 150 .. 00
2_'545.0 0 70. 0 (:)
414. 9.00 120.00
4?4'7.00 120~ O0 ........................
7.?.--.~:_::. (')0 140.00
8'? 71.00 1:30.00
10660.00 120.00
11260, 00 .1. 2(), 0o
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
'' Operator, Well Na~ and Number
Reports and Materials to be received by:~ --'~ ~~--~-~'~
Date
ReqUired Date Received Remarks
,
Ccmp letio n Report Yes /~. _ / ~._~ / ~ / ~_~
Wel 1 History Y
_Samples
Mud Log
~ ....
Core Description , (
Registered Survey Plat
Inclination Survey
·
'l'DirectiOnal Survey
PrOduction Test .Re~orts
·
· , ,_ , ,
Digitized Data
, .. ,
ARCO Alaska, Inc.
Post Office Bc ,60
Anchorage, Alaska 99510
Teiemho~'e 907 ,_'277 ~537
September 9, 1983
Reference: Arco Directional Data
D.S. 3-19 ~-~ 7-8-83
D.S. 3-20'''~ 7-18-83
D.S. 3-21~- 8-8-83
D.S. 3-22J 8-24-83
D.S. 14-24-- 7-8-83
6-17-83
D.S. 14-25'~ 7-18-83
D.S. 14-31~j 8-22-83
D.S. 14-32-' 8-24-83
Single Shot
Teleco
Single Shot
Single Shot
Single Shot
-Magnetic Survey
Single Shot
Single Shot
Single Shot
EW
EW
EW
EW
EW
Teleco
EW
EW
EW
Please sign and return the attached copy as receipt of data.
_ -
Kelly McFarland
ATO-1429F
Trans. # 510
Chevron
D & M
Dallas
Drilling
·Exxon
Getty
Marathon
Mobii
DISTP.!BUTION~
North Geology
Phillips
Caroling Smith
Sohio Alaska Oil & GaS COILS.
Anchorage
State of Alaska
E
ARCO Alaska, Inc./--,.
Post Office 360
Anchorage, Alaska 99510
Teiecho~e 907 ?77 5L337
August 29, 1983
Reference:
Arco Cased Hole Finals
D.S. 3-19 ~'' 7-2-83 CBL/VD
D.S. 4-8 / 6-22-83 EPL
D.S. 5-17 ¢ 6-24-83 EPL
D.~S. 6-9 /~ 3-3-83 Epilog
D.S. 12-12 ~/~ 6-24-83 CET
7-23-83 CCL & Perforating Record
7-21-83 Completion Record
D.S. 13-3j 3-13-83 Epilog
?
D.S. 13-7¢ 3-12-83 Epilog
D.S. 14-5/ 8-22-80 Epilog
D.S. 14-7/ 1-12-81 Epilog
3-9-83 Epilog
D.S. 14-9B'JJ~ 3-11-83 Epilog
D.S. 14-24/ 6-30-83 CBL/VD
D.S. 14-26'~/ 2-27-83 Epilog
D.S. 16-11~/ 7-30-83 Spinner Log
Run 1 5" Sch
Run 2 5" Sch
Run 1 5" Sch
Run 2 5" DA
Run 1 5" Sch
Run 1 5" Sch
Run 1 5" Sch
Run 1 5" DA'
Run 1 5" DA
Run 1 5" DA
Run 1 5" DA
Run 2 5" DA
Run 1 5" DA
Run 1 5" Sch
Run 1 5" DA
5" Camco
/~//P1/e~se sign and return the attached copy as receipt of data.
Ke 1 ly McFar land
ATO-1429F
Trans. # 492
Chevron
D & M
Dallas
Drilling
Exxon
Getty
Marathon
Mobii
DISTRIBUTION
North Geology
Phillips
Prudhoe Bay
sohio
ARCO Alaska, Inc
Post Office u .:~ 100360
Anchorage. Alaska 99510
Telephone 907 276 1215
August 11, 1983
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Monthly Report of Drilling & Workover Operations
Dear Mr. Chatterton'
Enclosed are Monthly Reports of Drilling and Workover Operations
for the fol lowing'
DS 14-25
DS 14-31
~S: 3.-19
DS 3-20
DD 3-21
Pingut State #1
South Point State #1
Also enclosed is a revised Well Completion or Recompletion
Report and Log for DS 1-25. The report previously submitted
inadvertently incl. uded perforations which had been squeezed under
Item #24.
SinCerely,
M. A. Major
Area Drilling Engineer
MAM/CSM41' tw
Enclosures
ARCO Alaskm. Inc. is a Subsidiary of AtlanlicRichfieldCompany
, 'i' ? ~ STATE OF ALASKA ...... /'~,// ,.
'-- ~-- ~,'~ ALASK. )IL AND GAS CONSERVATION ( '.VIMISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIO
1. Drilling well J~ Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P. 0. Box 360, Anchorage, AK 99510 50- 029-20971
9. Unit or Lease Name
Prudhoe Bay Unit
4. Location of Well
atsurface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UN
5. Elevation in feet (indicate KB, DF, etc.)
62' RKB
6. Lease Designation and Serial No.
ADL 28331
10. Well No.
3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
For the Month of July ,19 83
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well ~ 0600 hrs, 06/17/83, Drld 17-1/2" hole to 2545'; ran, cmtd, & tstd
13-3/8" csg. Drld 12-1/4" hole to 10660'. Ran, cmtd & tstd 9-5/8" csg, drld 8-1/2"
hole to 1.1260'. Ran logs. Ran, cmtd & tstd 7" lnr. Drld cmt to 11210' PBTD. Ran
CBL. Ran 5-1/2" completion assy. Secured well & released rig ~ 0330 hfs, 07/03/83.
SEE DRILLING HISTORY
13. Casing or liner run and quantities of cement, results of pressure tests
20" 91 5#/ft, U-40, weld conductor set ~ 80'
13-3/
Colds
9 -5/8
7", 3
SEE D
8" 72#/ft, L-80, Butt csg w/FS ~ 2531'.
et II cmt.
" 47#/ft L-80 Butt csg w/FS ~ 10649'
2#/ft, S00-95 Butt csg fr/10369'-11257'.
RILLING HISTORY
Instld w/1990# poleset.
Cmtd w/2300 sx Coldset I II
Cmtd w/500 sx Class G cmt.
Cmtd w/350 sx Class G cmt.
& 400 sx
14. Coring resume and brief description
None
15. Logs run and depth where run
DIL/SP/BHCS/GR fr/11253'-10595'
FDC/CNL/GR/Cal fr/11256'-10595'
GR fr/10595'-2525'
CBL fr/11210'-10280'
6. DST data, perforating data, shows of H2S, miscellaneous data
N/A
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Area Drilling Engineer ~
SIGNED TITLE DATE
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska'
Oil apd Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10404 PqM/MI~? ~ Submit in duplicate
DS 3-19
DRILLING HISTORY
NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld
17-1/2" hole to 2545'. Ran 64 jts 13-3/8" 72#/ft, L-80 Butt csg w/FS @
2531'. Cmtd 13-3/8" csg w/2300 sx Col dset III & 400 sx Col dset II cmt. ND
20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi
- ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW -
ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft,
L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd
csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS &
10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260'
(06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal
fr/11256'-10595'; GR to 2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300
sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg
fr/10369'-11257'. Cmtd 7" lnr w/350 sx Class G cmt. Wash 9840'-10054'.
Drld cmt to 11210' PBTD (07/01/83). Tstd lnr lap to 3000 psi - ok.
Displaced well to 9.8 ppg NaC1. Ran CBL f/11210'-10280'. Ran 5-1/2"
completion assy w/tail @ 10417' & pkr @ 10344'. Tstd tbg hanger & packoff
to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well
& released rig @ 0330 hrs,-07/03/83.
CSM/DH19' sm
08/11/83
ARCO Alaska, Inc/'-'"
Post Office ,.._x 360
Anchorage. Alaska 99510
Teiecho~e 9C..? ~.--, ~-
August 8, 1983
Reference- Arco Open Hole Finals
D. $. 3-19
6-28-83 CPL/Cyberlook
6-28-83 BHCS/GR
6-28-83 DIL/SFL/GR
6-28-83 FDC/CNL/GR (Poro)
6-28-83 FDC/CNL/GR (Raw)
6-28-83 GR
Run 1 5" Sch
Run 1 2" & 5"
Run 1 2" & 5"
Run 1 5"
Run 1 5"
Run 1 5"
sign and return the attached copy as receipt of data.
Kelly McFar land
ATO-1429D
Trans. # 451
Chevron
D & M
Dallas
Drilling
Exxon
Ge tty
Marathon
Mobil
D I STRIBUTI ON
North Geology
Phillips ~-v
Caroling Smith
......... · ~4~ COPS
Sohio A?.'~ .... m-
ARCO Alaska, Inc.~.~-.'--
Post Office 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
July 13, 1983
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT- Monthly 'Report of Drilling & Workover Operations
Dear Mr.-Chatterton-
Enclosed are Monthly Reports of Drilling and Workover Operations
for the following'
DS 14-23
DS 14-24
DS 13-27
DS:3-I9
Pingut'State #1
South Point State #1
and Well Completion or Recompletion Reports and Logs for'
DS 7-24
DS 13-28
Also enclosed are revised Well Completion or Recompletion Reports
· and Logs for-
DS 1-25
DS 13-29
DS 7-25
Sincerely,
M. A. Major
Area Drilling Engineer
MAM/CSM34-sm
Enclosures
ARCO Aiaska. Inc. is a Subsidiary of AHanlicRichfie!dCompany
~ ~-~ STATE OF ALASKA .-, ,-~,.
~ ALASKA .'iLAND GAS CONSERVATION C 'i1MISSION
Mo T 'iLY REPORT OF DRILLING AND WORKOVER OPERATIO S-d
· Drilling well)~ Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 83-92
3. Address 8. APl Number
P. 0. Box 360, Anchorage, AK 99510 50- 029-20971
76'
4. Location of Well
at surface
FSL, 397' FEL, Sec. 10, TION, R15E, UM
I 6. Lease Designation and Serial No.
ADL 28331
For the Month of, June , 19 83
5. Elevation in feet (indicate KB, DF, etc.)
62' RKB
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
3-19
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
12.Depthatend~fm~nth~f~~tagedri~~ed~fishingj~bs~directi~na~dri~~ingpr~b~ems~spuddate~remarks
Spudded well @ 0600 hfs, 06/17/83. Drld 17-1/2" hole to 2545'; ran, cmtd, & tstd
13-3/8" csg. Drld 12-1/4" hole to 10660'. Ran, cmtd & tstd 9-5/8" csg, drld
hole to 11260'. Ran logs. Ran, cmtd & tstd 7" lnr. Drlg cmt as of 06/30/83.
8-1/2"
SEE DRILLING HISTORY
13. Casing or liner run and quantities of cement, results of pressure tests
20", 91.5#/ft, H-40, weld conductor set ~ 80'.
13-3/8" 72#/ft, L-80, Butt csg w/FS ~ 2531'.
Coldset I I cmt.
9-5/8", 47#/ft, L-80 Butt csg w/FS ~ 10649'.
7", 32#/ft, S00-95 Butt csg fr/10369'-11257'.
SEE DRILLING HISTORY
Instld w/1990# poleset.
Cmtd w/2300 sx Coldset III
Cmtd w/500 sx Class G cmt.
Cmtd w/350 sx Class G cmt.
& 400 sx
14. Coring resume and brief description
None
15. Logs run and depth where run
DIL/SP/BHCS/GR fr/11253'-10595'
FDC/CNL/GR/Cal fr/11256'-10595'
GR fr/10595'-2525'
6. DST data, perforating data, shows of H2S, miscellaneous data
N/A
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ Area Drilling Engineer
SIGNED TITLE
DATE.__
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 CSM/MR22 Submit in duplicate
3-19
DRILLING HISTORY
NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld
17-1/2" hole to 2545'. Ran 64 jts 13-3/8" 72#/ft, L-80 Butt csg w/FS @
2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & 400 sx Coldset II cmt. ND
20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi
- ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW -
ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft,
L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd
csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS &
10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260'
(06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal
fr/11256'-10595'; GR to 2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300
sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg
fr/10369'-11257,. Cmtd 7" lnr w/350 sx Class G cmt. Wash 9840'-10054'.
Drld cmt to 10369' as of 06/30/83.
CSM/DH19'sm
07/08/83
ARCO Alaska, Inc. .----..,
Post Office Bc
Anchoraae. Alaska 99510
_
July 14, 1983
Reference:
Arco Magnetic Tapes w/Listings
1-22
11-2-82
OH tape w/Listing ~1513
D.S. 3-19 6-28-83
OH tape w/Listing ~68387
DA
Sch
Please sign and return the attached copy as receipt of data.
Kelly McFarland
ATO-1429D
Trans. ~ 430
Chevron
D & M
Dallas
Drilling
Exxon
Getty
Marathon
Mobil
DISTRIBUTION
North Geology
Phillips
Prudhoe Bay
R&D
Caroling Smith
Sohio
State of Alaska
497'
97'
lO
16
VICIN I'F"f' MA?
AC ? zct,.l¢
AS- E~Lt. ILq- b OCA'l'lOtq5
)4= '11Z,9oo.64
L-Al' ~- 70* 13
/,,.OM~= 146*16'53.5Z7"
V,/'-~LL zo 1/= 5, gF(~0zz2,57
x¢ -/I Z, 8-~Z .4 I
LA1'= 7o:13'43,g57"
,JUN
Abska Oil & Gas Cons, Oommission
Anchora§e
NORTH AMERICAN PRODUCI~G DIVISION
ALASKA DISTRICT -- PRUDHOE BAY
As- CU/I..7-
BRAV,fiN~ No:
MEMORANDUM
State of Alaska
ALASKA~L ~ CAS CONSERVATION COMMISSION
TO~. V. ~h~ % ~// DATE:June 20, 1983
Chai'rm n~~
~. FILE NO:10 SB/F
~r~: Lo~i~ C. S~ith k / TELEPHONE NO:
C~ssioner
FROM:
~en Le~7o~an
~trole~ Inspe~or
SUBJECT:~i ~,~,/.~ (~n~
,~... tness BOPE Tes
ARCO's DS 3-1~, -;
Sec. 10, T10N, R15E, U~],
Prudhoe Bay Unit.
SatUrday, June !8.,_ 1983 I departed my home at 3:15 PM for
a 3:45- ~ showup and 4:45 PM departure via Alaska Airlines
flight No. 341 for Deadhorse arriving at 7:10 PM. Weather:
+52°F, Clear, no ~nd.
Sunday, June I9,~ 1983 BOPE tests on DS 3-1~ began at
~':1'5 AM and. ~re completed at 11:00 AM. BOPE inspection
report is attached.
I departed Dead, horse via Alaska Airlines Flight No. 56 at
4:30 PM arriving in Anchorage at 6:10 P[-~ and at my home at
6:40 PM.
In summary, I ~_itnessed successful BOPE tests on ARCO's
DS 3-19.
Att achme nt
02-00IA(Rev. 10/79)
ot~ #4 ~
,~/8i ..-.
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION CCMMISSION
B ,O. P.E. Inspection Report
Operator ~ _ _/~. ~
Well ~ ~ ~/F
Location: Sec / O T/~/~F~:M A/,-/g
Dril linq Contractor
ERte Jul A,"~' /%. /9~
Repr e sent at ive i/~_/~
·
/~a"s~n~ Set ~ m.~ ~-S- ~t.
T~ ~,,~, ~ # ~a' ~epres~ntative ~~Z3~-
location, General_ ~/~
Well Sign dP ~
Ceneral Housekeeping ~/~
Reserve pit (3/~
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve--
Kill Line Valves
Check Valve
Test Pressure
ACCUMULATOR SYSTEM
Ful 1 Charge Pres sure ~ CD ~30
Pressure After Closure
Pump incr. clos. pres. 200 psig
Full Ch ~a~ge _Pressure Attained:
N2 ~./O~ /
Controls: Master
~emote ~:~ ~__
psig
Dsig
psiq
rain ~ sec.
min .~ sec.
Blinds switch cover ~_~ _
Kelly and Floor Safety Valves ·
Upper Kelly
~r Kelly,
Inside BOP
Choke Manifold
No. Valves.__
No. flanges. ~/O
Adj ustab le Chokes
Hydrauically operated choke
Test Pressure
Test Pressure
Test Pressure
Test Pressure
Test Pressure
Test Results: Failures / Test Time'-? ~-"'?" hrs
Repair or Replacement of failed equipment to be made within . days and
Inspector/Ccmmission office notified.
·
Remarks: .~_~-~%. _~~. /~- ~.'/'~" ~ ~. z~~
Distribution
orig. - A0&02C
cc-Operator
cc - Supervisor Inspector
June 8, 1983
~r. Mark A. Major
Area Drilling Engineer
AP:CO Alaska, inc.
P. O. Box 360
AnchoraRe, Alaska 9J~10
Re: ~rudnoe Bay Unit DS 3-19
ARCO Alaska, inc.
Pe~it No. 83-92
Sur. Loc. 76'FSL, 397'FEL, Sec. 10, T1
Btmhole L~c. 537'FNL, 405'FF~L, Sec. 16, T101~, R15E, t~.
Dear ~. Major:
Enclosed is the approved application for permit ~o drill the
above referenced ~'ell.
If coring-is conducted, a one cubic inch chip fron each foot of
recovered core is required. Samples of well cuttings and a mud
log are not required. A Continuous directional survey is
required-as per 20 AAC 25.050(b)(5). If available, a tape
containing the digitized log information shall be submitted on
all logs for copying except experimental logs, velocity surveys
and dipmeter surveys.
~any rivers ~ ..,
~n Alaska and their drainage ~ystems have been
classified as important for the spawning or r.-:~igration of
anadro~aous fish. Operations in these mreas are sub.~ect to
AS 16.05~870 and the regulations promulgated thereunder
(Title 5, Alaska Administrative Code). Prior to
operations you ~ay be contacted by the Habitat' Coordinator's
Deoart~ent of Fish and Game.
Office, _ ~.
Pollution of any ~aters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations pror~ulgated thereun~]er
(Title 18, Alask8 Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as am~ended. Prior to
c~mncing operations you may be contacted by a representative
of t!~e De~art~ent· ~ -of Enviro~ental Conservation.
To aid us in scbeduling field work, please notify this office
24 hours prior to commencing installation of the b].o~-.~out
Mr. Mark A. MmJor
Prudhoe Bay Unit DS 3-19
-2- June 8, 1983
prevention equipment so that a representative of the Commission
may be present to witness testing of the equipment before the
surface casing~shoe is drilled. Where a dtverter system is
required, please also notify this office 24 hours prior to
commencing equipment installation so that the Commission may
witness testing before'drilling below the shoe of the conductor
pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
VerY truly
'--J I '-.__.,,.,~-f~ /-
C. V. Chatterton
Chairman of
Alaska Oil and Gas Conservation Commission
--Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
be
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
May 31, 1983
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 3-19, Permit to Drill
Dear Mr. Chatterton:
Enclosed is our application for Permit to Drill DS 3-19 and the
required $100 filing fee. Attachments to the application include
a plat detailing the section and plan views of the proposed
wellbore; a proximity plat showing the subject wellbore's
position to the nearest well drilled; a sketch and description of
the BOP equipment; and a sketch and description of the surface
hole diverter system.
Since we expect to spud this well on June 15, 1983, your earliest
approval will be appreciated.
Sincerely,
M. A. Major
Area Drilling Engineer
MAM/J G3/L40: tw
Enclosures
ARCO Alaska, Inc, is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA ~--
ALASKA L~,L AND GAS CONSERVATION CO,v~MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL ~
DEVELOPMENT GAS []
SERVICE [] STRATIGF1APHIC []
SINGLE ZONE [~0X
MULTIPLE ZONE []
2. Name of operator
ARCO Alaska, Inco
3. Address
P. 0. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
76' FSL, 397' FEL, Sec. 10, T10N, R15E,UH(Approx.)
At top of proposed producing interval
492' FNL, 11' FEL, Sec. 16, T10N, R15E, UM
At total depth
537' FNL, 405' FEL, Sec.16, T10N, R15E, UM
9. Unit or lease name
Prudhoe Bay Unit
10. Well number DS 3-19
11.Fieldandpool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no.
RKB 62' PAD 26' I ADL 28331
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed
Deadhorse miles 492 feet 3-15well 130' ~ 5823' TVD feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
11,219 ' MD, 9207 ' TVD feet 2560 06/15/83
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3513 psig@.____ Surface
KICK OFF POINT2600 feet. MAXIMUM HOLE ANGLE 43 oI (see 20 AAC 25.035 (c) (2) psig@ 9207 ,ft. TD (TVD)
4131
21
i Proposed Casing, Liner and Cementing Program
SIZE SETTING DEPTH QUANTITY OF CEMENT
i Hole
B0"
~7-1/2"
2-1/4"
Casing
20"
13-3/8"
9-5/8"
7
Weight
91.5#
72.0#
47.0#
8-1/2" 29.0#
22. Describe proposed program:
CASING AND LINER
Grade Coupling
H-40 WELDED
L-80 BUTT
L-80 BUTT
L-80 BUTT
Length
MD TOP TVD
80' 36' 136'
2514' 36' 136'
I
10,451 '
1,041'
33' ~33'
I
I '
10,184' 18452'
I
MD BOTTOM TVD
116' I 116'
2550' 2550'
0,484' 18669'
11,219' 9207'
(include stage data)
2000# Poleset
2300sxCSIII & 400sxCS 11
500 sx Class"G"lst Stage
300 sx CS I 2nd Stage
400 sx Class "G"
ARCO Alaska, Inc., proposes to directionally drill this well to 11,219' MD (9207' TVD) to produce the
Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack wi]l be
installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP
equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17# L-80
tubing, packer, and gas lift mandrels will be run. Provisions for subsurface safety equipment will be run. A
non-freezing fluid will be left in all uncemented annuli within the permafrost interval. The packer will be set
above the Sadlerochit. A Sundry Notice will be submitted when the well is to be perforated. A surface diverter
will be installed and operationally tested prior to spud and at least dai]y thereafter. DS 3-19 will be 130'
away from DS 3-15 at 5823' TVD. There are no closer wellbores anywhere downhole.
· 23. I hereby certify that the foregoing is true and correct to the best of my knowledge
The space below for Commission use
Samples required
[] Y ES
Permit number
APPROVED BY , · .
Form 10-401 GRU3/PD31
CONDITIONS OF APPROVAL
Mud log required
i--}YES ~.N 0
Approval date
~,' /// /////
Directional Survey required I APl number
~,YES []NO 50- O
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE
by order of the Commission
June 8. 1983
Submit in triplicate
ANNULAR
PREVENTER
BLIND RAMS
PIPE RAMS
PIPE RAMS
RECEIVED
13-5/8" BOP STACK DIAGRAM
Accumulator Capacity Test
1. Check and fill accumulator reservoir to proper
level with hydraulic fluid.
2. Assure that accumulator pressure is 3000 psi
with 1500 psi downstream of the regulator.
3. Observe time, then close all units simultane-
ously and record the time and pressure remaining
after all units are closed with charging pump
off.
4. Record on IADC report. (The acceptable lower
limit is 45 seconds closing time and 1200
psi remaining pressure.
13-5/8" BOP Stack Test
1. Fill BOP stack and manifold with a non-freezing
liquid.
2. Check that all hold down screws are fully
retracted. Mark running joint with predeter-
mined plug seating depth. Run test plug on
drill pipe and seat in wellhead. Run in lock
down screws.
3. Close annular preventer and chokes and bypass
valves on manifold.
4. In each of the following tests, first hold
a, 250 psi low pressure test for a minimum of
3~ minutes, then test at the high pressure.
5. Increase presure to~__~O~_O p~~si and hold for a
minimum of 3 minutes. ~-B+e~d pressure to zero.
6. Open annular preventer and close to~t~o~
pipe rams. Increase pressure to 50~
and hold for at least 3 minutes. Bleed pres-
sure to zero.
7. Close valves directly upstream of chokes and
open chokes. Increase pressure to 5000 psi
& hold for at least 3 minutes. Bleed pressure
to zero.
8. Open top set of pipe rams then close bottom set
of pipe rams. Increase pressure to 5000 psi
below the bottom set of pipe rams and hold for
at least 3 minutes.
9. Test remaining untested manifold valves (if
any) with 5000 psi upstream of valve and zero
pressure downstream.
10. Bleed pressure to zero. Open bottom set of pipe
rams.
11, Back off running joint and pull out of hole.
Close blind rams and test to 5000 psi for at
least 3 minutes.
12. Bleed pressure off all equipment. Open blind
rams, Make sure manifold and lines are full of
non-freezing liquid and all valves are set in
drilling position.
13. Test standpipe valves to 5000 psi.
14. Test Kelly cocks and inside BOP to 5000 psi with
Koomey pump.
15, Check operation of Degasser.
16. Record test information on blowout preventer
test form. Sign and send to Drilling Super-
visor.
17. Perform complete BOPE test once a week and
functionally operate'BOPE daily.
Rev.
5/13/81
SURFACE
HOLE D IVERTER SYSTEM. SCHEMATIC
ARCO ALASKA INC'.
_, r.
.,.,,.,.--'--- I 0" HYD. OPR. BALL VAL'CE
~ .,.,,...---- WELL BORE ( SEE DETA IL )
./'" .,,," ~ I 0" HYD. OPR. BALL VALVE
// J//' I ALL 90° TURNS ARE "TEE"
~ I CUSHION I
WELL
RESERVE
PIT
AREA
NOTE'
FLOWL INE
F
DR ILL ING
RISER
20" 2000 PSI WP
ANNULAR PREVENTOR
',,,, ,,/
lO" DIVERTER LINE"'""' ~ ~ '""'
Valves on diverter
lines open automati-
20"
cally when the annular
preventer is closed. PIPE
I O" HYORAUL IC
OPERATED BALL VALVES
"DETAIL"
202..601 (
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No.
ITEM APPROVE DATE
thru 8)
(.9~thru
(4) Casg
(12 thru 2~): -
(21 tt~rd
( 6 > Ad d: ~.~ 6/~/p$
YES 'NO
1. Is the permit fee attached ..........................................
2. Is well to be located in a defined pool .............................
3. Is well located proper distance from property line
4. Is well located proper distance from other wells.
5. Is sufficient undedicated acreage available in thig pool
.6. Is well to be deviated and is well bore plat includi~ .]-
7. Is operator the only affected party .........................
8. Can permit be approved before ten-day wait ...........
®
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
· 22.
23.
24.
25.
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is conductor string provided ........................................
.,
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones .......................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
..
Is old wellbore abandonment procedure included .on 10-403 ............
Is adequate well bore. separation proposed ...........................
Is a diverter system required ....................................... ~
Are necessary diagrams of diverter and BOP equipment attached ....... /~
Does BOPE have sufficient pressure rating - Test to ~O psig .. z~
Does the choke manifold comply w/AP1 RP-53 (Feb.78) ..................
Additional requirements .............................................
Additional Remarks:
REMARKS
Geology: Engi .n~er ing:
/
WVA _i~ JKT/~j_HJH --'~'
rev: 12/06/82
'" INITIAL GEO. UNIT ' ON/OFF
POOL CLASS STATUS AREA NO. SHORE
,
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIXi
,.
No 'special'effort has been made to chronologically
organize this category of information,
L'T~ T~PE
000 000 01,6 065
o00 000 004 065
o0o Ooo 012 065
000 000 004 065
000 000 004 065
o00 r)OO 002 065
o0(') o00 008 065
oo0 000 006 065
oo0 00o 004 065
E f'~ T ¢. Y
6O
, :li;q
0
F P ?
Ci", I,
C, I' :, q'
4 t-: !.,.. fi ~;'
rtl
].l~a9 I[..P 2,9922
~2.7~0n O~ 36,0625
2.6n35 i{C~;I, 3642,0000
53,9687 N~AT 2.0996
'1.0547 II,D 6,7344
00,2500 GP 19,9531
2,5~25 },;Ch!_, 3476,0000
4q,.Sa25 ~.'~.a? ~.4297
55.
-999,
-999 .
73.
- 9 99.
- 9 q 9 ,
546
8 20
750
15~
4 ~'~ 4:
0 ! 3
757
25O
3 43
742
250
437
03
1 R 7
875
0 O 0
75O
5~: 0
B 20
9a6
250
250
25O
'~75
2%o
250
25O
25.0,
2'50
I) T
DT
R H 0 B
j' ~l?,
D T
R ~": !l ~:-
(7 P
[3 T
20.6563
76.6~]75 GR
24,1562
32.3'750
76,5625 GR
2.5762 NCNL,
25.8281
26,6, 875
94,7500
2,2949
36,0000
?000,0!)00 iI, D
68.O0OO GR
2.451.2 ~tCN'L,
55.4063 ~PAT
-999,2500 JLD
-999,2500 CR
-999.2500
-oq9.2~OO NRAT
-9q9,25().}
-999.2500 (;P
-999.2500 ~':Cf;i',
-9~9.250~
-9~9.2500 ILl>
-999.250n
-999.25~Q ~,.RAT
25.2656
21.5469
~ 0000
410 ~1,~16
41,5000
23,4844
2994,0(,)00
2.6465
38,5625
~0,8906
.; 5352,
5.5703
95,4375
3056,0000
~' 8398
15,8984:
55,7500
1579,0000
4,0703
-999,2500
-999,2500
-999,2500
-999,2500
-999,2500
-999.2500
-999.~500
-999,2500
-~99 2500
-999!2500
-999 2500
-999,2500
-g99 2500
-g99,2500
-Ogq.2500
-999,2500
-999, .... 500
p
P
P h 'l'
,
· - 9 <'.~ 9 o ? h C' o C i;
.-999 2500 I:':~
'909,2500
'999.2500
'999,250<)
' 2 5 00
'999 , ,
-999.2500
-909 2500 G'R
- ,2500 t~CN i,
-~99,2500
- 9 g 9,25 (} 0 I !, D
-999,2500 GR
- 999,2 !500 ~; C N I;,
-g99,2500
-~.9.25oo
-~gq, 2500
-g99.2500
-9qn 2500 G~
-9~9'
.250n t,~CNb
-oo9.2500 ~,~,~T
-o99,250o GR
-9o9,2~00
-ggg,~500
-9~)9.2500
-999 2500
-999 2500
-999 2500
-999 2500
-999. 2500
- 99 9,2 5:0 0
"9 99
- 99 9:' 2500
-999,2500
-99g'2500
-999,2500
-999'~500
-999,2500
-999,'2500
-999; 2500
'"99:9, ~500
-999,2500
-999,2500
-999,2500
-,999,2500
-999 2500
-999 2500
-999 2500
=999 2500
-999 2500
'999i2500
-g99 ~500
-999 2500
-99g 2500
-999i2500
-9Q9 2500
-999 2500
-999 2500
-g99,2500
-gg9,2500
-g99,2500
? -999
P !-{ T - 9 g 9
CNt< -9q9
'" P
n 'a' ~.. n
C a 1,, I
%., ·
b T
' g g 9.2500 (; ~
74,~1'375
'99~'2500 DT
3,7500
-999 · 2500 I L
4~. 3..1. 3 ~
-999.2500 iI,D
-999,2500 GR
-999,2500 Nt~AT
-999,2500 I[,,D
-9~9.2500 GR
-q99.2500 ~,;CNL
'999,2500 ~R~,T
-9q9,2500 IT.,D
-999,2500
-~g9,.2500 NCN,[,
-999,2500 N~AT
-990.2500
-999 2500
.god ~ 2500
-099,2,500 N~AT
-999.250o
-g99.250o
-999.2500
-999.25o0
-Qgg.250n II,D
'g99.2500 GR
'9<~9.2500
-999.250n
-999,2500
-o99.2500
-999,2500
-999 2500
'999,2500
'999.2500
,,,999, ~500
i999,2500
999,2500
999.2500
..999'2500
..999,2500
- 9:99:' 2 5 0 0
-999 ~ 2500
'999,2500
,0
,.~9'9,2'500
'999,2500
'999,2500
'999,2500
'999,2500
'999,2500
'999,2500
'999,2500
-999 2500
-999,~500
-999,~500
-909,2500
'999.2500
'999,2500
'999,2500
'999,~500
'999 2500
-999~2500
-999,2500
3 5,3 ~. 2 5
,,., r.} ~'? a, 250 ('1 i L ,v,
.999 ,. 250 ¢..,~ D 'T
-9o9.2500
.:~ 3.75 (! <'
-999,2560
· ,,999,2500
-q99,2500
' 9 !~ 9.250
- 99 g ,. 2 f:":',' 00
-999 2500
' 9"') 9 '
,',999' 2500
,2500
- ~. 99,2 50 0 I L [.:,
-999,2500
,,,, ,,t ,
-999,,2500
'999,2500
2500 1 ~, P
2500 GR
2500 NCNL
2500 N P .A T
-999,250o
-9q9 o 2500
-999,2500
-,oq9,2500
-C~99,2500 Tt,,D
-aC~9,2c, 00 GP
-aa9,2500
-9q9,25(,0
-g~9,2500
-999,2500
-999.2500
-90~, 25;')0
-~Q9.25{)0 '*PAT
-999 2500
-999, ~500
'999. 500
-9'99,2500
-999,2500
2500
- 2500
999,
-999,2500
-999 2500
'999 2500
-999 ~500
-999 2500
-99g,2500
'999'~00
-999,~ O0
-~99.:2500
-999 2500
-999;2500
-999,2500
-999,2500'
-999,2500
-.999,2500
999,2500
-999,2500
-999 2500
-999,2500
-999,2500
-999,2500
-999,2500
-999 2500
-999:2500
-999,2500
.a9~2500
2$oo
-~9q 2500
,2500
' 9 <) 9,
999
· ~,
' g g 9,
99.
' 9 q 9.
'999.
-9 <~9 ,
'9<}9,
'q99,
-099,
35.
2500
2, 500
2500
2500
9375
25 C)' 0
2500
2500
2500
2500
2500
343 ~
2500
500
250n
250'o
250O
2500
J. 562
250n
2500
2500
~500
~.375
250n
2500
250n
937%
2500
25 {', 0
2500
21.~7
I: I,, M
D T
t::< H i':) ~::
P T
D T
- 999 ,. 2500
..,'999,2500
-999.2500
-999 2500
-999 2500
-999 2500
-999,2500
-999,2500 GR
-909,2500
-999,2500 ~,,~R,A T
-999,2500 ILD
-999,2500
-999,2500
-9n9,2500
-999,2500 I,t,P
9<:)9,2500 (';~
.
.gag. 2500
-o99.2500 Ii.,,D
-999.2500 GF
-909,2500 '~CNL
-~09.250n ~PAT
-909.2500 IL, D
-q99,2500
-~99.2500
-909,250n t',)RAT
-999,~500
-999, 500
.999,,~5o0
-999,2500
-999 ' 2500
9 99,25::00
.999,2500
999 ,~:500
-999,2500
-99:9,:2500
-999~'500
-999,~500
-999,2500
-999'2500
-999,2500
-999,2'500
-999,2500
-999,2500
-999,2500
'999,,250',0
-999,2500
-999.2500
-999.2500
-999,]500
-999,2500
-999,2500
-'999,2500,
-999,2500
-999,2500
'999,2500
-999,2500
-999,2500
-999 2500
'999i2500
-999 2500
-999 2500
-9q(9 2500 DT
'~99 2500
~ 1 , 1. 406
,,9q9,2500 DT
- 99 9,2 50 C) I~' )~ C) P
-9q9 25(>0
-qq. 9,2500 !')1'
-99q,2500 r.~ kj r,1 p
-9c~9.2500 ~1~'
33.6563
"q99.2500
'999,2500 (;R
-999,2500
'999~2S00 NRAT
-999. 250*') t, Li~
- 999, 500 G ~
-999, 500 N C I\i !.11~
-g99,2500 N ~:~ A
-g99 2500
~ ,~.
-qo9,2500 GR
-9o9,2500 NC~:~D
-999°2500
-999.2500
-9~9.2500
-Q99.2500 r.ICNI,
-9q9.2500 NRa?
-999.2500 lbo
-999,2500 G~
-999.2500 NC~Jb
-q09,2500 ~RAT
-0~9,2500 GR
-ggg.250n
-999.2509 r.tgAT
-999 2500
'999'
,2500
-999,2500
-999,~§00
-999,2500
-999,2500
'999,2500
-999'~500
'999 2500
' 999 ~500
-999 2500
'999 2500
'999,2500
-999.2500
-999,2500
-999'2500
-999.2500
-999,2500
-999 2500
'999:2500
'~99,2500
-999,2500
-999,2500
'999,2500
-999.2500
-999,~500
-999,2500
-999,2500
-99g,2500
-999.2500
-999.2500
-999.2500
-999,2500
999
9 9 9
- q.... o. q.., 250 O.:.[ I.,
,, 999.2500 [',
25 0 0 (:; P,
-g99 2.'50(:)
-999 '2500
- 9":~ 9 25O0
-~99 2500
-,909 2~:0o
-0,99 2500
-9~,~q 250O
-009 250O
40 ~563
- 99 'a ,, 2 r.; (') 0 I [..,
-9q9,2500
-999,2500
- 999,2500 (; R
-9o9 250n ~iCN
-990' ....
· ,2500 ~iPAT
qgO,2 .... 0,0 ILD
- 999,2500 G'a
-909,250o !'si C N' r,..,
".999 , 250'0 ~]RAT
-999 2500 ibp
-999 2500 GR
-999 2500
-999.2500
-999,250(t GR
-999.2500
'999.2500
- g 9 9.2 500
-999.2500
,,.999'2500
,,999,2500
-999,2500 ILl)
-999,2500 GR
-909,2500 t,lCN[,,
-999,2509 N~AT
-99q.2500 it.,D
-999,2500 GR
-099.2500
-999,250n
-g0~,2500
-ot~9,2500
-999.2~00 f:~AT
-r.~q9.2~On II,P
-009.2500
,-,9 q 9.250~'1
-999.2500
-999,2500
-999,2500
-999,2500
~999,2500
~999,2500
.999,2500
999'~500
'999 2500
'gg9'999
,,999 ~500
.-999.2500
99 ?' 2500
-999,~500
"' 999' 2500
-999 2500
-999. ~.500
-999,2500
-999,~500
-999,2500
-999,2500
-999,2500
-999,~500
-999,~500
-999,2500
-999.~50o
-999.~500
-999,2500
-99g.2500
-9o9.25o0
-g99.250o
-9o9.2500
.999,2500
-g99,25oo
-999.25oo
t~
· ' 9 <:) 9 '
SS,6q'75
37,
.o09,2500 :I:1,
-9q9,2500 F) T
' ~ 2~00
- 9 q 9,
42, ]439
. q q c,, 2 5 (:, 0
-9q9,2500 C
-9',~9, PSO0
~tl, 3 ,'1. '3 ~
-9~q,2SO0 t'~T
.9aq.2500
-On9,2500
· ~., .
-qag.250n [,~
',, 9 c,} 9,2 50 o ,I'
-. 9 a 9,2500
. o 99.2 5 00 ~'~ C N b
-999,2500
-9 9 9 2 5 0 0 G
-999 ~500
- 9 9 9,2 5 0 0 1515,
- 9 q 9 2 500 G
0~9 2500
- 99 9.2 5 0 0 ]..
, 5 ' GR
- 9 99,2.00
- q 9 9,2 S 0 0
-999,2500
'999,2500 GR
-999,2~00
-~9~, 250o NCNL
-q09,2500
-999,2500 1
-gq9,2500
=909,250n
-o<~9,2~00 ILO
-9q9,2509
-99o, 250n
-999 2500
-999 2500
-999 2500
-999 2500
'999,2500
-999,2500
-999,2500
-999,~5,00
-999,~500
'999:,2500
-999,2500
-099,2500
-999,2500
-999,2500
-999,2500
':999,2'~00
-999,2500
'999,2500
-999,2500
-999,25'0'0
-999 2500
'g99,2500
'999,2500
'999,2500
i909,2500
999,2500
999,2~00
-999.2500
999.2500
999,2500
q99,2500
-999,2500
99 2500
-.9 ...... ..o q ,250
:)6 * 250
. . 7,65
- q ,99,250
-9O9. 250
,,,9 99. 250
4 4 ,, ('.) () 0
· . 6 "' '
.o, o~ 250
,,,90q, ,'
53,437
- 9 ::i) 0, ? 50
- 9 9 9,
- 9 ",)° 250
. ~
-99° 250
-999
-009
.-!. 4
2 50
"2~0
.
250
-~q9. 250
30. ~; 4 3
' 9 '4, C'
.7
I !.. >!
[:;, T
D T
G P
[~-f,
,,, 9 99,2500 I [,
-999,2500 GR
-999 * 2500
' 999.250 n T I., t)
'999, ~500 gR
-999.~500 NCNL
-909,2 50 0 !';~ re A q'
-999. 2500
-999 . 25(3!) GR
-999,2500 NPAT
-999,250n it.r>
-099.2~00 GR
-0o~9.2%00 r4CNI.
-999,2500
-qq0,2500
-099,2500
-,c.iC, 9,2 ~'S 00 ',.' C :" !_,
-909. 250"}
-999.2~00
-qo9,250,~ ~,, C,~ 1'..,
-ggq,~_NOO
'999,2500
-999,2500
'999,2500
'999,2500
-999 2§00
-99~B00
-~0g,2500
-999,2500
'999,2500
"999,2500
-999,2500
-O99,2500
999,2500
~999,2500
-999.2500
-999,2500
. gv; soo
-999,22500
"'ggg, 2500
'999 2500
-999~2500
-999,2500
-999,2500
-099 250o
-999 2500
-9992500
-909.2500
-999,2500
-999.25O0
-q99.2500
:999.2500
999,2500
-999,2500
-9~9,2500
2500 :]' f., ,~
2500
4.375
25O (~
2.500 ~,' [-! r:'~ ~;'~,
?. 5 (} 0 r;;
g ,13 '7
-. 9 9 9,250 0 I L !')
- 9 9 9.2 5 0 0 (::;'P
-()99,2~00 N C. :N.'!r.,
-999,750(~
-999 500 GR
-9'~9 500 t'4CNI.,
"999 2500 NRAT
-999.2500 IL, t)
-999,2500 r,tCNb
-999,2500 NRAT
-999,2500
-qe9 250o
.669' '
,2500 r,,~ C ~.: l.,
-999,2500 ."'.~R ~ T
-~99,2500 I[,D
-9q9,250() ttCf,!b
-999.2500
-999,2500
-999,2500
-999,2500
-999 2500
-999 2500
-999 2500
-999 2500
-999,2500
-999 '2500
-999,2500
-999 ' 2500
-999.2500
-999,2500
-999,2500
-999,2500
-999 2500
'999.2500
'999.~500
'999.2500
-999,~500
-999,2500
-999.2500
'999.2500
-999.2500
999,2500
9~9,2500
999.2500