Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout183-092 • S bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 t 93 -I- RFCEIVED Mr. Tom Maunder Alaska Oil and Gas Conservation Commission JAN 201 333 West 7 Avenue Anchorage, Alaska 995011= �'�� . Commission Subject: Corrosion Inhibitor Treatments of DS -03 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from DS -03 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator a ..'°, -,, ' -:'""" .w q .!v±cs;' x ✓•..r. -.+ * ,�. .+w^rr.�..'4G.�x ^xcn ;rare^. .. - .�.•t,t °'+s ..,«.. r„- ..,...r. vc �a <. ,..�,;.. �..„ .. .. >.., • • BP Exploration Alaska p � ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) DS-03 10/26/11 Corrosion Initial top of Vol. of cement Final top of Cement top Corrosion inhibitor/ Well Name PTD # API # cement pumped cement off date inhibitor sealant date ft bbls ft gal 03 1750750 50029200930000 Sealed conductor NA NA NA NA NA 03-02 1760240 50029202030000 Sealed conductor NA NA NA NA NA 03-03 1760390 50029202110000 Sealed conductor NA NA NA NA NA 03-04 1760510 50029202180000 Sealed conductor NA NA NA NA NA 03-05 1760570 50029202220000 Sealed conductor NA NA NA NA NA 03-06 1760600 50029202240000 Sealed conductor NA NA NA NA NA 03-07A 2040430 50029202200100 Sealed conductor NA NA NA NA NA 03-08 1760730 50029202310000 Sealed conductor NA NA NA NA NA 03-09 1790220 50029203620000 Sealed conductor NA NA NA NA NA 03-10 1790210 50029203610000 Sealed conductor NA NA NA NA NA 03-11 1790470 50029203830000 Sealed conductor NA NA NA NA NA 03-12 1790580 50029203920000 Sealed conductor NA NA NA NA NA 03-13 1790710 50029203990000 Sealed conductor NA NA NA NA NA 03-14B 2090020 50029204070200 Sealed conductor NA NA NA NA NA 03-15A 1930150 50029204140100 Sealed conductor NA NA NA NA NA 03-16A 1970330 50029204150100 Sealed conductor NA NA NA NA NA 03-17 1791020 50029204200000 Sealed conductor NA NA NA NA NA 03-18A 1930420 50029204210100 Sealed conductor NA NA NA NA NA -Po' 03-19 1830920 50029209710000 0.3 NA 0.3 NA 1.7 7/31/2010 03-20A 1930470 50029209800100 6.2 NA 6.2 NA 40.8 8/2/2010 03-21 1831120 50029209900000 6.6 NA 6.6 NA 49.3 8/3/2010 03-22 1831230 50029210000000 0.0 NA 0 NA 7.7 10/26/2011 03-23 1831270 50029210040000 >25 21.0 0.8 7/15/2011 5.1 7/18/2011 03-24A 1980060 50029210150100 1.3 NA 1.3 NA 8.5 9/16/2010 03-25A 1930230 50029210210100 >25 12.0 2.25 7/12/2011 13.6 7/17/2011 03-26 1831510 50029210270000 0.2 NA 0.2 NA 0.85 8/2/2010 03-27 1840620 50029211090000 23.5 5.0 0.4 7/12/2011 3.4 7/17/2011 03-28 1840720 50029211140000 55.0 17.0 0.4 7/12/2011 3.4 7/17/2011 03-29 1840790 50029211180000 6.0 NA 6 NA 20.4 8/3/2010 03-30 1840830 50029211220000 4.4 NA 4.4 NA 22.5 8/3/2010 03-31 1840920 50029211290000 10.0 NA 10 NA 113.9 8/3/2010 03-328 2090050 50029211410200 1.5 NA 1.5 NA 8.5 7/30/2010 03.33B 2050180 50029211420200 7.8 NA 7.8 NA 57.0 7/30/2010 03-348 2000110 50029211320200 0.2 NA 0.2 NA 9.4 10/26/2011 03-35 1910800 50029221840000 5.8 NA 5.8 NA 39.1 7/28/2010 0336A 2070200 50029223400100 1.5 NA 1.5 NA 3.4 7/28/2010 03-37 2091390 50029234210000 2.5 NA 2.5 NA 16.2 8/2/2010 ~ ~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS ~~~~•~~® MAR 2 4 200 1. Operations Abandon ~ Repair Well Q ~ Plug Perforations ~ Stimulate ~ ~ ,~r~ Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~ Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well f1C 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~ Exploratory ~~ 1s3-o920 - 3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number: Anchorage, AK 99519-6612 50-029-20971-00-00 7. KB Elevation (ft): 9. Well Name and Number: 62 KB - PBU 03-19 _ 8. Property Designation: 10. Field/Pool(s): ADLO-028331 - PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 11260 - feet Plugs (measured) 10835' 4/3/95 true vertical 9231.82 ~ feet Junk (meas ured) 10326' 10340' 10350' 10835' RR ~~~ APR ~ ~ Zuut~ Effective Depth measured 10812 feet true vertical 8815 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" Surface - 80' Surface - 80' Surface 2469' 13-3/8" 72" L-80 Surface - 2531' Surface - 2531' Production 10587' 9-5/8" 47# L-80 Surface - 10649' Surface - 8663' Liner 888' 7" 32# SOO-95 10369' - 11257' 8410' - 9229' Perforation depth: Measured depth: 10658 - 10686 10779` - 10812 10780 - 10809 C 10820 - 10850 C 10855 - 10865 C 10872-10890 C 10894-10908 C10916-10936 C10944-10950 C 10974-10994 True Vertical depth: 8671 - 8697 8784 - 8812 8785 - 8642 8822 - 8850 8855 - 8864 8871 - 8888 8892 - 8905 8912 - 8931 8939 - 8944 8967 - 8985 Tubing: (size, grade, and measured depth) 5-1/2" 17# NT-80 SURFACE - 10268' 4-1/2" 12.6# NT-80 10268' - 10318' Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BAKER SB-3 PKR 10277' 9-5/8"5-1/2" BKR SB-3A PKR 10336' 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 380 5250 15032 249 Subsequent to operation: 324 4150 14392 244 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory (~' Development ~ Service ~'. Daily Report of Well Operations X 16. Well Status after proposed work: OiI ~ Gas WAG ~' GINJ WINJ !~"' WDSPL "' 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pre Title Data Management Engineer Signature Phone 564-4944 Date 3/19/2008 Form 10-404 Re sed 04/2006 r ~ ~~ Submit Original Only 03-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE I SUMMARY I 1/3/2008'"''** 03-19 LOWER PATCH ASSEMBLY SETTING - E-LINE UNIT 2266 "*** !T/IA/OA: 600/150/150. WELL SI ON ARRIVAL. RIH W/4.5"OD WEATHERFORD "ER" LOWER PACKER, COLAR LOCATOR, CPST SETTING TOOL. CCL TO MID ELEMENT: 13.5 FT. CCL STOP DEPTH: 2728.5 FT °"MID ELEMENT SET AT: 2742 FT, BOTTnnn nF PA(;KFR C~ 2742._5', TOP OF '' PATCH @ 2737.7 NINIMUM LD. = 3.00" iTnmm~~ Fn **** JOB COMPLETE **** 1/17/2008'*** WELL S/I ON ARRIVAL *** (patch) `DRIFTED W/ 4.50 CENT TO TOP OF LOWER PACKER @ 2735' SLM SET WEATHERFORD PATCH (21.83' OAL- 20' BETWEEN ELEMENTS. MIN I.D `"" 2.98). TOP OF PATCH ~ _2713' SLM *** JOB IN PROGRESS/ CONT ON 01-18-08 WSR *** 1/18/2008+**"* CONT FROM 1-17-08 WSR *** :RIG DOWN SURFACE EQUIP & EXTRA RISER `'**" WELL LEFT SI, DSO NOTIFIED OF WELL STATUS *** __ _ m _._ _ . ~.._ 2/17/2008`***WELL SHUT-IN UPON ARRIVAL*** `INITIAL WHP:475/175/125. RIH WITH WEATHERFORD LOWER ANCHOR SUB, SET AT 2014'. FINAL WHP: 400/190/240. 3/6/2008 ~**WELL S/I ON ARRIVAL*** SET4 5" 21.6' WEATHERFORD CROME PATCH @ 2,012' SLM. :SET W/ HALIBURTON ETD & BAKE - N _ F PATCH 1,991' SLM. ***NOTIFY DSO LEFT WELL S/I*** 3/7/2008 T/I/0= 400/180/140. Temp = SI. MIT-T PASSED to 2500 psi. (restore tubing integrity) Pressured tubing to 2500 psi. with 8.7 bbls of crude. MIT-T lost 120 psi. in the 1st 15 min. and 40 psi. in the 2nd 15 min. for a total loss of 160 psi. during a 30 `min. test. Bled tbg. to 950 psi. (fluid swapped to gas) Final WHP= 950/200/140. ***casing valves open to gauges*** FLUIDS PUMPED BBLS 1 diesel 1 Total STATE OF ALASKA ~ ~~ JAN 1 S 2008 ALA~A OIL AND GAS CONSERVATION COMMISSION ~~~'" REPORT OF SUNDRY WELL OPERATIONSA~aska Oil & Gas Cans. Commission Anehnrant3 1. Operations Abandon ~ Repair Well Q Plug Perforations ~ Stimulate ~ ~~ Other ~ Patch Tubing Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ~` Exploratory (~', 183-os2o' 3. Address: P.O. Box 196612 Stratigraphic Service 6. API Number: Anchorage, AK 99519-6612 50-029-20971-00-00 7. KB Elevation (ft): 9. Well Name and Number: 62 KB PBU 03-19 8. Property Designation: 10. Field/Pool(s): ADLO-028331 " PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: Total Depth measured 11260 - feet Plugs (measured) 10835' 4/3/95 true vertical 9231.82 - feet Junk (measured) 10326' 10340' 10350' 10835' Effective Depth measured 10812 feet F~~~`, ~--, r, , n~py e 7 v~U17G~t~ J~41~ ~ ~ ~~~ . ' true vertical 8815 feet E Casing Length Size MD TVD Burst Collapse Conductor 80' 20" Surface - 80' Surface - 80' Surface 2469' i3-3f8" 72" L-80 Surface - 2531' Surface - 2531' Production 10587 9-5/8" 47# L-80 Surface - 10649' Surface - 8663' - Liner 888' 7" 32# SOO-95 10369' - 11257' 8410' - 9229' Perforation depth: Measured depth: 10658 - 10686 10779' - 10812 10780 - 10809 C 10820 - 10850 C 10855 - 10865 C 10872-10890 C 10894-10908 C10916-10936 C10944-10950 C 10974-10994 True Vertical depth: 8671 - 8697 8784 - 8812 8785 - 8642 8822 - 8850 8855 - 8864 8871 - 8888 8892 - 8905 8912 - 8931 8939 - 8944 8967 - 8985 Tubing: (size, grade, and measured depth) 5-1 /2" 17# NT-80 SURFACE - 10268' 4-1/2" 12.6# NT-80 10268' - 10318' Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" BAKER SB-3 PKR 10277' 9-5/8"5-1/2" BKR SB-3A PKR 10336' 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 Subsequent to operation: 0 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory !~` Development ~' Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas WAG ~ GINJ ~ WINJ ~' WDSPL ~-_`, 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 1/16/2008 E k Form 10-404 ReGised 04/2006 -~ ~_ ~ ~_ ~ ~~~ <<, " ' "~~`~ Submit Original Only M • • 03-19 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVIT.Y~aTE.~ ;~ . ~ . SUN#MARY .:~ 12/25/2007 ~""`WELL S/I ON ARRIVAL""` =RIG UP SLICKLINE & PREPARE FOR DRIFT TUBING &PDS CALIPER ***CONT. JOB ON 12!26!07 W SR*"* 12/26/2007; """ CONT JOB FROM 12/25/07 "*" IRAN 3.83" CENT, BLB & S. BAILER, SEE TIGHT SPOT BETWEEN STA'S #7 & #8, TAG 4 1/2" X-NIP @10,297' SLM. RAN PDS CALIPER- LOGGED OOH FROM 10,315 SLM TO SURFACE C~ 50FT/MIN... GOOD DATA. RAN 5 1/2" WHIDDON C. SUB, UNABLE TO PASS STA #2 GLM. :':SET 5 1/2" SLIP-STOP CATCHER @ 5790' SLM. `:PULLED STA #1, & #2 DGLVS @ 3020' MD & 5693' MD SET T-2 LGLV IN STA #1 GLM (16/64 ports, TRO 1645#) @ 3020' MD =SET T-2 OGLV STA #2 GLM [26/64 ports] C~ 5693' MD ;PULLED EMPTY SLIP STOP CATCHER SUB C 5790' SET 4 1/2" x 2.313" X NIP REDUCER IN TT @ 10307' MD "`CONT. JOB ON 12/27/07 WSR"*" __ _ _. .v ___ ___. 12/27/2007 T/I/0=600/300/150 Temp=S/1 Assist slickline C_MIT TxIA to 2500 psi PASSED(Eval TxIA comm) Spear in to IA w/5bbls of ambient meth followed by 29.4 bbls of 95" S crude to reach 2500 psi for CMIT TxIA 1st test 1st 15 min lost 50/120 psi 2nd 15 =min lost 20/50 psi for a total of 70/170 psi in 30 min Bled TxIA psi down bled backaprox. 15 bbls Final Whp's=500/400/150 _~~.. _____ v ,W__ ~.. __...v~_ ~.._...,____ 12/27/2007; *" CONT JOB FROM 12/26/07 **" ;.SET 2-7/8" XX TT PLUG IN 4 1/2" REDUCER NIPPLE AT 1029T SLM. DRIFT TBG W/ 4.54" WFD DUMMY PATCH TO 3154' SLM... DRIFT CLEAR. ;LRS PERFORMED C-MIT Tx IA TO 2500 psi... PASSED [see LRS WSR] **"* TURNED WELL OVER TO LRS TO BLEED DOWN IA &TBG. """*" 1 /3/2008 ""*'' 03-19 LOWER PATCH ASSEMBLY SETTING - E-LINE UNIT 2266 """" T/IA/OA: 600/150/150. WELL SI ON ARRIVAL. RIH W/ 4.5"OD WEATHERFORD "ER" LOWER PACKER, COLAR LOCATOR, CPST SETTING TOOL. CCL TO MID ELEMENT: 13.5 FT. CCL STOP DEPTH: 2728.5 FT MID ELEMENT SET AT: 2742 FT, BOTTOM OF PACKER @ 2742.5', TOP OF PATCH @ 2737.7' NINIMUM I.D. = 3.00" T/IA/OA: 600/150/150 PATCH SET AT: 2722' - 2742, ""** JOB COMPLETE "'"*" ___~ _ ~__~ -.FLUIDS PUMPED. _.__ __~__ __ _ BBLS 1 DIESEL 1 TOTAL MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, Commissioner THRU: Tom Maunder, P. I. SuPervisor DATE: January 15, 2001 FROM: John Crisp, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Field Drill Site 03 .January 15, 2001' I traveled to BP's Prudhoe Bay Field to witness Safety Valve System tests on DS 03. Mark Womble was Bp representative in charge of testing DS 03. Testing had been canceled on DS 03 1-14-01 due to blowing snow & chill factor of-50 degrees. Testing was conducted in a safe & efficient manner. Two failures were witnessed. The AOGCC test report is attached for reference. 21 wellhouses were inspected during SVS tests. Wellhouses are in fair condition considering these were inspected after our recent blow. No heat or lights are installed in wellhoUses for producing wells. SUMMARY: I Witnessed SVS tests, in PBU on DS 03. 21 wells, 42 components tested. 2 failures witnessed. 4.8% failure rate. 21 wellhouses inspected. Attachments: SVS PBU DS 03 1-15-00jc cc; NON-CONFIDENTIAL SVS PBU DS 03 1-15-01jc.doc Alaska Oil and Gas Conservation CommiSsion Safety Valve System Test Report Operator: BPX Submitted By: John Crisp Date: 1/15/01 Operator Rep: Mark Womble Field/Unil/Pad: Prudhoe Bay Field DS 03 AOGCC Rep: John Crisp Separator psi: LPS 185 HPS 690 Well Permit Separ set L/P Test Test Test Date Oil, WAG, GIN J, Number NUmber PSI PSI -Tdp Code Code Code Passed GAS or CYCLE 03-01 1750750! 185 150 100 P P OIL 03-02 1760240 185 150- 120 P P OIL 03-03 1760390 185~ 150 '110 P P OIL 03-04 1760510.] 03-05 1760570 03-06 1760600 ' 03-07 1760530~ 03-08 1760730:' 185 150 130 P P OIL 03-09 17902201 185 150 100 P P OIL 03-10 1790210 . 03-11 1790470! 03-12 1790580 ' 03-13 1790710! 03-14 .1790820! 185' 150 100 P P OIL 03-15A 1930150: 185 150 100 P P OIL 03-16A '1970330! 03-17 1791020 03.18A 1930420 03-19 1830920 185! '150 90 P P OIL 03-20A 1930470 185! 150 100 P P OIL 03-21 1831120 185! 150 100 P P OIL 03-22 1831230 690! 600 420 P P OILi 03-23 1831270 185 150 0 1 P OIL 03-24A 1980060 690' 600 530 P P ' OIL 03-25A 1930230 03-26 1831510 18'5 150 110 P P OIL 03-27 1840620 185 150 100 P P OIL 03-28 1840720 :03-29 1840790 185150 110 P P OIL 03-30 1840830' 185 150 90 P P OIL 63-31 1840920 185 150 140 P P OIL 03-32A 1940540 185 150 110! P P OIL 03-33A 1970390 03-34B 2000110i 185 150 0 1 P I I1 SVS PBU DS 03 1-15-01c.xls Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed CAS or CYCLE 03-35 1910800 185 150 90 P P OIL 03-36 1930190 Wells: 21 Components: 42 Failures: 2 Failure Rate: 4.8% [] 9o var Remarks: o..o ,~ ,.r9 SVS PBU DS 03 1-15-01c.xls ?--, STATE OF ALASKA ~-. ALAS~.., OIL AND GAS CONSERVATION )MMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed' Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM At top of productive interval 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM At effective depth 338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM At total depth 344' FNL, 315' FEL, Sec. 16, T1 ON, R15E, UM 5. Type of Well Development Exploratory StralJgraphic Service {kY 1 6 1995 ~aska OB & Gas Cons. Comm~iOn 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-19 9. Permit number/approval number 83-92 10. APl number 50 - 029-20971 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11260 feet 9232 feet Plugs(measured) Bridge Plug @ 10812' 'MD (4-3-95) Effective depth: measured 10812 feet true vertical 8815 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1990# Poleset 80' 80' Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531' Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663' Liner 888' 7" 350 sx CIG 11257' 9229' Perforation depth: measured 10658-10686'; 10779-10809'; [Isolated below Bridge Plug: 10820-10850'; 10855-10865'; 10872-10890'; 10894-10908'; 10916-10936'; 10944-10950'] true vertical 8671-8697'; 8784-8812'; [Isolated below Bridge Plug: 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931 '; 8938-8944'] Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD; 4-1/2", 12.6~, L-80, PCT@ 10459' MD Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A SSSV @ 2168' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1005 2350 11407 1241 2854 6764 Tubing Pressure 344 288 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 · -,,,-. · I./'7 I~AID Title Engineering Supervisor SUBMIT IN DUPLICATE~ 3-19 DESCRIPTION OF WORK COMPLETED BRIDGE PLUG INSTALLATION FOR WATER SHUTOFF & REPERFORATIONS 3/30/95 · RIH & tagged PBTD at 10936' MD. 4/3/95 · Performed an Inflatable Bridge Plug installation for Water Shutoff as follows: MIRU & PT equipment. RIH w/Bridge Plug & inflated to set plug at 10812' MD (mid-element), to isolate the open perforation intervals below at: 10820 - 10850' MD (Z4) 10855 - 10865' MD (Z4) 10872 - 10890' MD (Z4) 10894 - 10908' MD (Z4) 10916 - 10936' MD (Z4) 10944 - 10950' MD (Z4) Ref. Log: BHCS 6/28/83. Sheared off & tagged IBP to confirm set. POOH. Rigged down 4/20/9S' Reperforated: 10782 - 108O2' MD (Z4) Ref. Log: BHCS 6/28/83. Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing at underbalanced pressure. Returned well to production w/gaslift & obtained a valid welltest. Gas Cons. c0mm ssi0n Anchor~.." Schlumberger GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9463 Company: 5/12/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 2-18 ~-'c~ ~ CNT-D 042595 I 1 D.S. 3-19 ~,~ ._¢~,~.,. PERFRECORD 042095 I 1 D...S. 5-6 (31-6-10-15) '~5-5~ I PROD PROFILE 042095 I 1 D.S. 6-04 '~----(~,. DUAL BURST TDT-P 042095 I 1 D.S. 9-30 ST1_c~5 o~( PERFRECORD 042495 I 1 D.S. 12-21 ~ ~--~-./'~:~ PERFRECORD 042695 1 1 D.S. 12-34 C~z3/. --/~"] PERFRECORD 042495 I 1 D.S. 16-1 o°~3- {~-~ ~ PERF RECORD 04 2395 I 1 D.S. 17-15 c~r~-/~~ PERFRECORD 042595 I 1 ..... SIGNED- Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: ;'" "!995 5 19.95.. Alaska Oil & Gas Co~s.uomrmssion Alaska Oil &~~'~'- Commission knchor~g-3 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9409 Company: 4/1 3/95 Alaska Oil & Gas Cons Comm Attn' Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 1-22A 95110 MWDGR 010995 1 D.S. 15-08A 95148 MWD GR. 102693 1 D.S. 2-24 PROD PROFILE 040395 I I ' D.S. 3-19 INFLATABLE BRIDGE PLUG 040395. I 1 D.S. 5-12 PROD PROFILE 040395 I 1 D.S. 9-25 PERF RECORD 032795 I 1 D.S. 9-25 PERF RECORD 032895 I 1 D.S. 9-40 PERFRECORD 0331 95 I 1 D.S. 11-6 :PATCH SE'l-rING RECORD 032595 1 1 D.S. 14-3 ' PATCH SETTING RECORD 040495 I 1 D.S. 15-17 GCT 040595 I 1 ~i~i 16-23 COLLAR & JEWELRy LOG 0331 95 I 1 ................. D.S. 16-23 PERF RECORD 0403 95 I 1 D.S. 18-02A GCT 0401 95 I I APR 1 3 199b ;Allohors: ~ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA -- ALASKA OIL AND GAS CONSERVATION C .¢IMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 3-19 At top of productive interval 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM At effective depth 338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM At total depth 344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM RECEIVED MAR 1 4. 1995 feet 9. Permit number/approval number 83-92 10. APl number 50 - 029-20971 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11260 feet 9232 feet Plugs(measured) PBTD Tagged @ 10951' MD (1/7/95) Effective depth: measured 10951 feet true vertical 8945 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1990# Poleset 80' 80' Surface 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531' Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663' Liner 888' 7" 350 sx CIG 11257' 9229' Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890'; 10894-10908'; 10916-10936'; 10944-10950' true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931 '; 8938-8944' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD; 4-1/2", 12.6#, L-80, PCT@ 10459' MD Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A SSSV @ 2168' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Productionorlnjection Data OiI-Bbl Gas-M~ Water-Bbl Casing Pressure /. 1008 ~'3155 10305 - 1067 2112 10675 - Tubing Pressure 353 335 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ./.~~ "~. ./~.,,..-' Title Engineering Supervisor Form 10-404 Rev 06/15/88 ^^. I/"7 I~,AIR Date 3 ¢ ~ ¢ ? ~' SUBMIT IN DUPLICATE 3-19 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 1/7/95- RIH & tagged PBTD at 10951' MD. 2/27/95 · MIRU & PT equipment. Reperforated: RIH w/perforating gun & shot 25' of reperforations as follows: 10821 - 10835' MD (Z4) 10839 - 10844' MD (Z4) 10919 - 10925' MD (Z4) Ref. Log: BHCS 6/28/83. Used a 3-3/8" carriers & shot 4 spf at 180 degree phasing at balanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to production w/gas lift & obtained a valid welltest. RE¢I IVED B/ R 1 4 1995 Naska 0il & Gas Cons. Commission Anchorage Schlumberger GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9310 Company: 3/1 0/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 3-19 PERF RECCRD 022795 I 1 D.S. 4-35 DUAL BURST TDT-P 022895 I 1 D.S. 6-23 PERF RECORD 03 0 2 9 5 1 1 D.S. 7-32 PERF RECORD +JEWELRY 022695 I 1 D.S. 16-21 CHEMICAL CU'I-rER RECORD 022595 I 1 D.S. 7-19 95016 CNL 111394 I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ---- STATE OF ALASKA ALASKA .L AND GAS CONSERVATION C(' MISSION REPORT OF SUNDRY WELL OPP_.RATIONS 1. Operations performed: operation shutdown .. Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator 5. Type of Well 6. Datum of elevation(DF or KB) Development X 62 RKB feet ARCO Alaska, Inc. Exploratory 3. Address Stratigraphic 7. Unit or Property P.O. Box 100360, Anchorage, AK 99510-0360 service Prudhoe Bay Unit 4. Location of well at surface 8. Well number At top of productive interval 9, Permit number/approval number 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 83-92 At effective depth ~'--)AUG 1 5 1994 10. APl number 338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM Alaska 0il & Gas Cons. Commission 50 - 029-20971 At total depth Anch0ra~e 11. Field/Pool 344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11260 feet Plugs(measured) PBTD Tagged @ 10993' MD (7/7/94) true vertical 9232 feet Effective depth: measured 10993 feet true vedical 8984 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1990# Poleset 80' 80' Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531' Production 10587' 9-5/8" 500 sx CIG & 300 sx CS I 10649' 8663' Liner 888' 7" 350 sx CIG 11257' 9229' Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890'; 10894-10908'; 10916-10936'; 10944-10950' true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931'; 8938-8944' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13 CR, Tbg @ 10268' MD; 4-1/2", 12.6#, 13CR, Tbg @ 10330' MD; 4-1/2", 12.6~, L-80, PCT @ 10459' MD Packers and SSSV (type and measured depth) Baker SB-3 packer @ 10277' MD; Baker SB-3A Packer @ 10336' MD; Camco TRDP-1A SSSV @ 2168' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1427 ~"1946 7003 -- 289 Subsequent to operation 1518 4401 9011 -- 334 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 1( 'Rev 06/15/88 · ~ .~ O .,I I,I q ~,,.~ · V'~' I%ftlD 3-19 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 6/4/94 · RIH w/CT & jetted a fill cleanout from 10890' down to 11150' MD. PBTD tag at 11032' MD. Made a final post-FCO 6/5/94 · MIRU & PT equipment. RIH w/perforation gun & tagged bottom fill at 11017' MD, then PU & shot 6' of perforations as follows: Added perforations: 10944 - 10950' MD (Z4) Ref. Log: BHCS 6/28/83. Used 3-3/8" carrier, shot 4 spf, at 60 degree phasing. Shot at underbalanced pressure. POOH w/perf gun. Noted all shots fired. Rigged down. 7/7/94 · Performed a Production Profile log & tagged PBTD at 10993' MD. Returned the well to production w/gas lift & obtained a valid welltest. RECEIVED AUG 1 5 1994 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Date: Subject: From/Location: Telephone: To/LOcation: August 3, 1994 ARCO Cased Hole Finals Karla Zuspan/ATO- 1529 (907) 265-6547 Distribution P.O. Box 100360, A .... norage, AK Transmittal #: 94068 99510,d~ ~k, Well Log Date Tool Type Contractor Number (M-D-Y) ~_ --/6 01-03 7-4-94 Leak Det I SCH ._~'/'~ 5'~ 03-12 7-2-94 Inj Prof 1 SCH ~.~ 03-19 7-7-94 Prod Prof I SCH _~5 - 2."~ 03-25A 7-7-94 Perf Record 1 SCH '~ - ¢3 04-02 7-3-94 Leak Det 1 SCH ~_~-~-?? *04-07 ST1 7-8-94 Per[ Record I SCH ?¥-.zz. 05-01 7-9-94 Tubing] Cutter I SCH ~' 05-11 7-9-94 Perf Record I SCH ? ~;~/,,'o 06-11 7-2-94 Dual Burst TDT-P 1 SCH ~' 06-21 7-1-94 Prod Prof I SCH ~'.7,-5'-? i 06-22A 7-4-94 Per[ Record I SCH ~ 07-02 ' 7-4-94 Prod Log I SCH ~ 09-31A 7-8-94 GR/Collar I $CH r ~-. (( ~ 09-32 7-7-94 Dual Burst TDT-P I SCH ~ 15-01 7-2-94 Prod Prof 1 SCH ~6- ,~-c3 16-02 7-5-94 Inj Pmf 1 SCH ~ 16-10 7-6-94 Inj Pmf 1 SCH I~,~ 16-24 7-3-94 Per[ Record I SCH _ ~'t -c~G~ 17-07 7-5-94 Leak Der 1 SCH *The correct APl number for 04-07 ST1 is 50-029-20189-00. Number of Records: 19 / ,: ^ j ~ . Kada Zuspan Distribution: Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska~ Mobil Please~g~.~,~~by signing and returnin ~,~ '¢/,,.... g a'~g, py ~'[r~nsm~ ARCO Alaska, Inc. Is a Subsidiary of AltantlcRIchfleldCompany ARCO Alaska, Inc. Date: Subject: From/Location: ' Telephone: To/Location: June 21, 1994 ARCO Cased Hole Finals John E. DeGrey/ATO- 1529 (907) 263-4310 Distribution P.O. Box 100360, ~,.,chorage, AK 99510,~~, Transmittal #: 94049 '~~F' Well ! Log Date i Tool Type Nurr~eri (M-D-Y) -05ST i 6-13-94 i/~ Dual Burst 1-06 I 6-13-94 1/ Dual Burst 1-11 i 6-14-94 I" PerfRecord 1-25 ! 6-10-94 1/ Perf Record 1-29 ! 6-14-94 i~'' Dual Burst ! i 3-02 ! 6-07-94 i/ Tubing Cutter 3-19 ! 6-05-94 i-/' PerfRecord 4-36 i 6-11-94 !'" Perf Record 4-41 I 6-12-94 t,/Cutter Record 5-11 I 6-11-94 I ~' Dual Burst 9-15 i 6-13-94 I / IniProf 9-18 ~ 6-14-94 i / IniPmf Run,~, Scale I 5" , ! 5II 1~ 5II 1 1 1 5" I 5" I 5" 1 5" I 5" 1 5" I 5" 1 5" ~q- i 9-25 i 6-i4-94 i / injProf i 11-35 i 6-11-94 I f PerfRecord i 11-36 i 6-07-94 ! / Perf Record i 13-31 ! 6-09-94 ! /'' Perf Record ! 13-35 i 6-09-94 1 / Perf Record /!.. 14-03 i 6-15-94 i ~- Prod Log 14-03 i 6-15-94 t~ Dual Burst 16-23 i.6-13-94 i-" Leak Detection 16-23 i 6-10-94 i/Alpha Tubing I 17-02 i 6-6-94 i~ Prod Prof 18-02 i 6-12-94 t/ Perf Record 18-04 I 6-12-94 i/- DuaiBurst 8-19 i 6-10-94 t-.'l_eak Detection i i 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1,1 &5" ! 5II 1, 5" ! 1, 1" &5" Contractor Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch * The correct APl # for 1-05ST is 50-029-20076-00 Number of Records: E. DeGrey Distribution: Central Files ANO-8 Geology Exxon Mobil Phillips BPX State of Alaska- ARCO Alaska, Inc. Is a Subsidiary of A~ant]cRIchfleldCompany ARCO Alaska, Inc. Date: Subject: From/Location: ' Telephone: To/Location- P.O. Box 100360, ~-chorage, AK May 23, 1994 Transmittal #: ARCO Open Hole Finals John E. DeGrey/ATO- 1529 (907) 263-4310 94038 Distribution \t Well 'I Log Date Number! (M-D-Y) Tool Type 1-10 I 05-10-94 Collar 3-19 i 04-24-94 3-24 05-1 O-94 05-01-94 3-32A i 05-01-94 3-32A ! 05-01-94 3-32A l 05-01-94 4-5A [ 5-5-94 4-5A ! 5-3-94 r ~ Collar Log V' Dual Laterolog ,/ BHCA/GR v/ CNL/GR v/' SSTVD - ~-PFC/GR/Coilor ,./' SSTVD 4-5A ! 5-3-94 ~Borehole Prof 4-5A i 5-3-94 CNL/GR 4-5A i 5-3-94 ,v'DuaiLaterolo~] 4-5A i 5-3-94 i,/ BHCA/GR 11-29 I 04-27-94 I JylWD:TVD/GRC, ~v'. EWFI,FXE 04-27-94 . ~WD:MD/GRC, v EWR,FXE 05-08-94 ,/Borehole Prof 5-8-94 v" SSTVD 5-8-94 ,/ DIFIJGR/SP 05-08-94 11-29 I 11-36 ~ 11-36 11-36 11-36 15-32 03-25-94 15-32 04-25-94 15-32 04-25-94 15-32 03-35-94 15-32 05-04-94 15-33 05-04-94 15-33 103-29-94 17-19 [ 04-01-94 * Includes diskette Number of Records: 27 ARCO Alaska, Inc. Is a Subsl~Jary of AllantlcRl~fl~ldCon1:~ny vMWD:TVD/DGR, CNP,DSFD ,/JVI~:MD/DGR, EWR FXE v,MWD:'I'VD/DGR, EWR,FXE Run, Scale ! 5II ! 5II 1,5" 1, 2"&5" 1, 2"&5" 1, 2"&5" ! 1 "&2"&5" ! 5II 1 2"&5" 1 2"&5" 1 2"&5" 1 2"&5" 1 2"&5" 1, 2"&5" 1, 2" 1; 2"&5" 1, 2"&5" 1, 2"&5" 1-13, 2"&5" .1-13, 2"&5" 1-13, 2"&5" 1-13, 2"&5" CNP, DSFD Section Slimhole Section 1-13, 2"&5" MWD:MD/DGR Collar Log,i 1 ,5" 1-20, 2"&5" ! Contractor Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Sperry Sperry Atlas Atlas Atlas Atlas Sperry Sperry Sperry Sperry Sperry Sperry Sperry Atlas STATE OF ALASKA ALA,SKA OIL AND GAS CONSERVATION COMMISS,,.,N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing x Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 76'NSL, 397'WEL, SEC. 10, TION, R15E At top of productive interval 373' SNL, 139' WEL, SEC. 16, TION, R15E At effective depth 338' SNL, 297' WEL, SEC. 16, TION, R15E At total depth 344' SNL, 315' WEL, SEC. 16, TION, R15E 5. Type of Well: Development Exploratory StratJgraphic Service 6. Datum elevation (DF or KB) RKB + 62' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 3-19 9. Permit number/approval number 83-92/Conservation order #258 10. APl number 50- 029-2O971 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical 11260 9232 11210 9185 Size feet Plugs (measured) feet feet Junk (measured) feet Cemented Measured depth True vertical depth RECEIVED MAY 2 7 1994 A~sska 0il & Gas Cons. Commission Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, NT-80, 13CR tubing to 10257'MD; 4-1/2", 12.6/t, 13CR80 tubing to 10330' MD; 4-1/2", 12.6#, L-80, tubing tail 10356'-10459'MD Packers and SSSV (type and measured depth) 13-3/8", Baker hydraulic packer @ 1991' MD; 9-5/8", Baker 'SB-3' packer @ 10277' MD; 9-5/8", Baker 'SB-3'packer @ 10336' MD; Camco '7-RDP-1A' flapper valve @ 2168' MD 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaae Production or Iniection Data -- OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations x 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is t~'ge~and correct to the best of my knowledge. S,~ned z.~ ~\\ ,I~~,/.... TitleDrillin~En~lineerSupervisor Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 3-19 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 05/05/94 10:00 SPUD: RELEASE: 05/10/94 07:00 OPERATION: DRLG RIG: WO/C RIG: DOYON 16 05/06/94 ( 1) TD:l1260 PB:l1205 05/07/94 ( 2) TD:l1260 PB:l1205 05/08/94 ( 3) TD:l1260 PB:11205 05/09/94 ( 4) TD:l1260 PB:l1205 ND TREE & ADAPTER FLANGE MW: 8.5 Seawater MOVE RIG TO WELL DS 03-19. MOVE RIG OVER WELL AND LEVEL SAME. SET IN SUPPORT TANKS TAKE ON SEAWATER. RIG UP AND PULL BPV. WAIT ON SECOND LOAD OFF SEAWATER. RIG UP TO DISPLACE DIESEL FROM WELL. DISPLACE DIESEL FROM WELL TO VAC TRUCK. DISPLACE WELL TO SEAWATER RECOVERING SOME CRUDE AND GAS FROM WELL. INSTALL TEST PLUG IN WELL. NIPPLE DOWN TREE AND ADAPTER FLANGE. TEST BOPE MW: 8.5 Seawater NIPPLE UP BOPE. TEST BOPE. LEAKING BY BLANKING PLUG. RIG UP LUBRICATOR, PULL BPV. MU UP LANDING JT IN HGR, TEST BOPS AND CHOKE. BACK OUT LOCK DOWNS. PULL LOOSE HGR. PULLED TO FLOOR, LD HANGER. CIRC BOTTOMS UP. MONITOR WELL. WRESSURE WELL TO 2000 PSI. PULL AND LAY DOWN 5.5" COMPLETION STRING. SSSV. RD TBG TONGS. RIG UP, TEST BOPE. TRIP IN W/ 8.5 BIT & CSG SCRAR MW: 8.5 Seawater TEST BOPE INSTALL WEAR RING. SERVICE RIG. PICK UP OVERSHOT FISHING ASSY. TRIP IN HOLE. SLIP AND CUT DRLG LINE. TRIP W/ FISHING ASS ON 3.5" DP. CHANGE OUT 5" ROTART BUSHINGS TO 3.5". TRIP IN PU 3.5" DP TO 10250'. KELLY UP TAG FISH @10286'. WORK OVERSHOT OVER FISH. TRIP OUT. LAID DOWN REMAINING 5" COMPLETION ASSY. RECOVERED CUT JT AND SEAL ASSY. LD FISHING ASSY. MU 9 5/8" CSG SCRAPER AND 8 1/2" BIT. TRIP IN HOLE. TRIP OUT TO RUN COMP STRING MW: 8.5 Seawater TRIP IN W/ 9 5/8" CSG SCRAPER. CIRC DOWN TO PACKER TOP @10325'. REVERSE CIRC. BOTTOMS UP. TRIP OUT. SLM. P/U 5 JTS 2 1/16" & 9 5/8" BAKER TEST PACKER, TRIP IN HOLE. WASH THROUGH 4.5" PKR AND TAIL PIPE ASSY 10295-10489'. REVERSE CIRC @10456'. SET 9 5/8" BAKER PACKER @10270', TEST CASING. CIRC HOLE TO CLEAN INHIBITED SEAWATER. TRIP OUT STD BACK 80 STDS. L/D 3.5" DP. RECEIVED MAY 2 7 1994 fi, iaska Oil & Gas Cons. Oommissir~ Anchorage WELL : DS 3-19 OPERATION: RIG : DOYON 16 PAGE: 2 05/10/94 ( 5) TD:l1260 PB:11205 05/11/94 ( 6) TD:l1260 PB:l1205 LAND 5.5" COMPLETION STRG MW: 8.5 Seawater TRIP OUT LAYING DOWN 3.5" DP. L/D BAKER TEST TOOL & 2 1/16" PIPE. PULL WEAR BUSHING. RIG UP WEATHERFORD TBG TONGS. P/U 4.5" TAIL PIPE & BAKER PACKER ASSY & RUN 5.5" COMPLETION STRING. RIG UP OTIS CONTROL LINE SPOOL. ATTACH LINES TO SSSV. PRESSURE LINES. P/U & RUNNING 5.5" COMPLETION STRING. SPACE OUT P/U HANGER. ATTACH & TEST CONTROL LINES. DROP BALL INSTALL BPV & LAND TBG. RELEASE RIG MW: 8.5 Seawater LAND COMPLETION STRING. RILD. TEST TBG. HGR B/O LANDING JT. NIPPLE DOWN BOPE. NIPPLE UP ADAPTER FLG & TREE. TEST SAME. BULL BPV THRU LUBRICATOR. SET TEST PLUG. TEST TREE. RIG UP TEST TBG & SET PACKER. TEST ANNULUS. DISPLACE TO DIESEL. PUMP 134 BBLS TO ANNULUS & U-TUBE TO TBG. INSTALL BPV. CLEAN TREE & CELLAR AREA. PUMP OUT PITS & SLOP TANKS. MOVE OFF WELL. PICK UP MATTING BOARDS & HERCULITE. PICK UP AREA. RELEASE RIG @1900 HRS ON 05/10/94. SIGNATURE: (drilling superintendent) DATE: RECEIVED MAY 2 7 1994 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Date: May 24, 1994 P.O. Box 100360, ~. orage, AK Transmittal #: 94040 9951O Subject: ARCO Cased Hole Finals From/Location: Telephone: To/Location: John E. DeGrey/ATO- 1529 ' · (907) 263-4310 Distribution Number. (M-D-Y) ! Scale 2..~ ! OWDW-i 4-29-94 v/, PITS i 1,5" SCH SW I ~ 1-9A I 5-14-94 ,/'"~Perf Rec ! 1, 5" SCH 1-20 i 5-7-94 t/ PerfRec i 1,5" SCH 2-4 ! 5-11-94 v/ ProdProf f 1 5" SCH 2-4 ! 5-11.-94 v'" CNL i 1,5" SCH 2-5 I 5-7-94 v"' Prod Prof i 1, 5" SCH ~'~ ~ ~-z-~4 ,/ ONE ~ ~, ~" SON 2-20 I 4-30-94 ,.//Prod Prof J~ 1, 5" SCH 2-20 ~ 5-13-94 ,/ CNL I 1,5" SCH 3-19 ! 4-4-94 v,'~. Brid~]e Plu~] I 1, 5" SCH 3-29 ! 5-3-94 ],,/ Brid~]e Plu~] i 1, 5" SCH 3-32A i 5-9-94 ~vrJSIT(Cem &Corr) ! 1, 5" SCH i SCH 4-5A ! 5-17-944 ~/ Perf Rec i 1, 5" SCH 4-SA ~-~7-~4 ~ USlT i ~,S" SCH 5-6 ! 4-30-94 ,/ Prod Prof 1, 5" SCH 5-35 5-3-94 v/ TDT-P 1, 5" SCH 6-10 4-5-94 v/ Leak Detect 1, 5" SCH -11 SCH 6-22A 5-14-94 v/v~, Perf Rec i 1, 5" SCH 7-3 ! 5-8-94 Prod Prof 1, 5" SCH 7-3 5-7-04 v~, Perf Rec 1, 5" SCH 7-23 5-10-94 ~"3ewelry Set Rec 1, 5" SCH 7-23 5-15-94 ,/'Completion Rec 1, 5" SCH 9-13 5-16-94 v/,Brid~e Plul; 1, 5" SCH 9-26 4-6-94 v/ PerfRec . 1, 5" SCH 9-42 5-15-94 v~/Leak Detect 1, 1" 2" 5" SCH 9-47 I 5-16-94 v' Packer Set Rec 1, 5" SCH 12-8B 5-4-94 ,/ Prod Prof 1, 1" 5" SCH 13-8 f 5.2-94 ~ InjProf ~ 1,5" SCH 13-31 ! 5-2-94 ~,/ usam i ~ 5" SCH 13-35 ! 5-10-94 1,/'- USIT ~ 1, 5" SCH ,: . 14-7 ~ 5-13-94 ~Tubin~ Patch Reci 1, 5" SCH 14-15 ~ 5-17-94 ~ CNL ! 1,5" SCH 14-41 i 5-8-94 /Dual Burst TDT-P i 1, 5" t SCH 16-26 I 5-6-94 ~./ PerfRec ~ 1,5" SCH 17-19 ~ 5-12-94 v" PerfRec 1,5" SCH 18-1 5-16-94 ~ Perf Rec 1, 5" SCH ARCO AI~ lng. Is a SubsJ~ary of AlianticFI1cflflMdCOnlpany ARCO Alaska, Inc. Date' . Apr 14, 1994 P.O. Box 100360, , .horage, AK Transmittal #: 94034 Subject: ARCO Cased Hole Finals From/Location- Telephone: To/Location: John- E. DeGrey/ATO- 1529 (907) 263-4310 Distribution Well Number 77-54 01-1 ~-12Z.; 01-33 "~-"f 5i 03-01 Log Date J Tool Type (M-D-Y)! 04-02-94 i'"' Perf Record 03-25-94 ] TDT-P 03-28-94 03-27-94 03-02 03-22-94 SS-~?-{ 03-19 ~fq_'/cl '-~ 03-29 .:.'% 03-29 03-22-94 03-18-94 l ./- TDT- P i'" Pert Record i- Leak Detection [,, Bridge Plug ~ Leak Detection 03-27-94 !./ Bridge Plug ~[-c~7-i 03-31 03-27-94 !,/ Bridge Plug i /04-43 03-29-94 i ¢/ TDT-P t5!(04-43 03-29-94 i/ CNTG i X04-43 i 03-10-94 !¢' USIT · .,-..,4 tv, USIT c~...tOi 04-44 ! 03-1~ o · ~1~(-:5~i !./ USIT Cement 06-19 07-08 O7-23 09-01 09-02 09-03 09-19 09-27 11 -O4 11-17 1-24A 12-06A 13-20 ~-'5~, i 14-03 ~?..-~;~( ! 14-23 ~ 4-28 3Z-I~ 4-28 i'X,14-28 i~5- F{Z.=. 14-35 ~?..-I 5~ 16-04A 1~5-7_q~ 16-18 ~Z.- ~ J 16-28 Run, Scale Pert Record 1 5'l 5" 5" 5" 2" 5" 5" 5" 5" 1 5" Contractor Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch 1 5" 1 5" 1 5" I 5" I 5" I 5" Sch Sch Sch Sch 04-45 i 03-29-94 05-08 i 03-14-94 !,/ Prod Profile Sch 03-18-94 Sch 1~, 5II ! 5II 1, 1"&5" 1 511 1, 1"&5" 04-03-94 !.~ Pert Record · 03-21-94 !'./ Bridge Plug 03-30-94 {~. Prod Profile 03-17-94 i -/ Prod Profile 03-29-94 !/ Prod Log 04-01-94 iv" Pert Record 03-16-94 i / Prod Log 03-22-94 t / Pert Record 03-16-94 ! / Patch setting ! 5II {./ Pert Record ,/ 5II Sch Sch · Sch Sch Sch Sch Sch 1, 5" Sch 1, 5" Sch 03-29-94 1, 5" Sch 03-18-94 i. Prod Profile 1, 1"&5" Sch 03-15-94 Sch 1, 1 "&5" ! 5fl Leak Detection CNL Prod Profile 1, 1"&5" ! 5II Sch Sch Sch Sch Sch Sch Sch 03-28-94 03-19-94 03-15-94 !,,- Leak Detection 1, 5" 03-28-94 iv" Patch Setting 03-21-94 i/' Bridge Plug 03-17-94 ! v' CNL 03-15-94 i,,-- Perf Record 03-14-94 03-14-94 03-20-94 Leak Detection 1 511 1,5" 1, 2"&5" : 5 ,I : 1, 1 5'1 : v- Pert Record TDT-P Sch Sch Sch Number of Records: 38 ARCO Alaska, Inc. Is a Subsidiary of AflanflcRIchfleldCompany ARCO Alaska, Inc. Date: Feb 25, 1994 P.O. Box 100360, , norage, AK Transmittal #: 94024 99510,~ ~, Subject: ARCO Static Pressure Surveys -From/Location: John E. DeGrey/ATO-1529 Telephone: (907) 263-4310 To/Location: Distribution Number (M-D-Y) Scale 2-3 { 6-5-93 I Static Press Surv. 2-5 ! 7-21-93, Static Press Surv. 3-8 ! 11-22-93 ! Static Press Surv. 3-19 i 1-3-94 l StaticPressSurv. 3-34A i 11'22'93 I Static Press Surv' 3-35 i 12-7-93 t Static Press Surv. 3-36 l 7-24-93 t Static Press Surv. 4-12 i 11-17-93I Static Press Surv. i " Sch ict~oc~-t°c°c' t 4-31 i 1-3-94 l StaticPressSurv.. 4-32 i 9-8-93 I Static Press Surv. 4-41 ! 11-21-93 t Static Press Surv. 5-12 i 7-21-93 i Static PressSurv. 6-19 i 11-28-93! Static Press Surv. 7-7A ! 7-21-93 StatiC press Surv. I " Sch 7-8 ~ 9-2-93 Static Press Surv. 9-49 i 9-14-93 Static Press Surv. 11-! 9-5-93 Static Press Surv.l " Sch 16ST1 11-17 f 11-26-93 Static Press Surv. 12-16Ai 11-8-93 Static Press Surv. 13-14 [ 7-2-93 Static Press Surv. " Sch 13-14 I 7-2-93 Static Press Surv. " Sch 14-01 i 11-25-93 Static Press Surv. " Sch 14-6 I 11-25-93 Static Press Surv. " Sch 14-18 [ 11-26-93 Static Press Surv. " Sch 14-38 12-4-93 Static PressSurv. " Sch 14-39 12-4-93 Static Press Surv. " Sch c[ ,~c2i3_.ot~ctct 15-6 5-28-92 Static Press Surv. " Sch 15-15 7-5-93 Static Press Surv. " Sch [ ~=t-~0-[O~O 15-16 8-26-93 Static Press Surv. " Sch 15-18 i 10-26-93 Static Press S'urv. " Sch 15-23 l 9-23-93 Static Press Surv. " Sch 16-12 ! 7-21-93 Static PressSurv. " Sch 16-17 ! 12-29-93 Static Press Surv. " Sch 16-18 ! 7-18-93 Static Press Surv. " Sch 16-22 I 7-18-93 Static PressSurv. " Sch 17-1 [ 11-23-93 Static Press Surv. " Sch 17-13 i 8-27-93 Static Press Surv. " Sch 18-29A t 5-19-93 Static Press Surv. _ " Sch ARCO Alaska, lng. is a Subsidiary o! Alla~llcRIdlflgdComl:eq ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 12-2-93 REFERENCE: ARCO CASED HOLE FINALS 7l?-I1~ 1-3 10-31-93 ?~1-4 11-5-93 7~0~ 1-16 11-5-93  1-22 11-7-93 i -24A 10-14-93 -~2~6 10-31-93 -~o 11-6-93 ~-~~-30 10-31-93 ~?~%-~ 1-32 10-31-93 11-9-93  /~~ii 10-18-03 11-4-93 -9-7 10-20-93 ~~-~ 9-7 10-25-95 --5O 11-1-93 5 1-12 11-9-93  1-168T 11-8-93 _ ~//12-16A 10-26-93 12-16A 11-8-93 ~_~14-4 11-6-93 10-19-93 and return the attached~f.p~ ~s RECEIVED BY__~_~ Have A Nice Day! Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON # BPX # STATE OF ALASKA Perf Record IO~ % -Jt00~. Run 1, ~' Sch Perf Record ~9~T~ ~q%'t~ Run 1, 5" Sch Prod Profile/~o ]Wt--m?lf~[f~Run 1, 5" .o- I 0u. f:~ Sch Prod Profde [~o~01%7~-mf)f~%/~ca/~Run 1, t~' ] ~°~0~ {0SRO Sch D~ B~t T~P I~00--11~0~ R~ 1, ~' Sch Peal Record ~O~lo~Z~ R~ 1, ~' Sch Peal Record ~0-~ - R~ 1, ~' Sch Completion Record ~0~ R~ 1, ~' Sch USIT (C~'~i~v(~m~ Color 'R~ 1, ~' 5~00~0~00 Sch Peal Record ~$~ ~~ R~ 1, ~' Sch TBG Patch Record R~ 1, ~' '7000 -7~ Sch Collar (Packer ~t) . R~ 1, ~' ~O2V~i0q~ Atlas D~ B~st TDTP ~0~{~0o0 R~ 1, ~' Sch Pe~ Record ~0~q~0 R~ 1, ~' Sch Pe~ Record I~%~{~ R~ 1, ~' Sch ~od ~o~e [~tm lZ~}~ff~R~ 1, 1"~" ~t~.~ Sch IBP Set ~00~o R~ 1, ~' Sch I,e~ Detect]50~0~f~ ~,m 1, 1" 0~ ~ Sch Pe~ Record :~ 0~ ~~ R~ 1, ~' Sch CNL IzI O0-1~9 ~ R~ 1, ~' Sch Pe~ Record I t~ ~0 ~ 1%%~ R~ 2, ~' Sch ~ Detect l~0~i~O R~ 1, 1"~" Sch Peal Record ~~ R~ 1, ~' Sch L~er/Jewe~/G~ R~ 1, ~' ~7~0-550~ Sch ~ Detect(~]~ll~ , ~ 1, T'~" 0- %~o Sch ~od ~o~e ~o ~)f~~~ 1, 1"~" o-t~0%L Sch TBG ~cher Zu~-~5o R~ 1, ~' Sch Peal Record 2~00~0~% R~ 1, ~' Sch receipt of data. . t MOBIL The correct APl# for 3-20A is 50-029-20980-01. This log was ran on 4-11 not the sidetrack and the correct API# is 50-029-20286-00. The correct API# for 9-7 is 50-029-20223-00. This log was ran on 12-16A and the correct API# is 50-029-20899-01. he correct API# for 18-29A is 50-029-22316-01. ARCO ,~_ l~.~ka, Inc. P. 0 .Box 100360 Anchorage, Alaska 99510 REFERENCE: ~__~_~~1-14 DATE: 6-9-93 14-22A 17-19 5-6-93 Static Pressure Run 1, 5" Sch 5-8-93 Prod Profile l~m 1, 5" Sch 5-10-93 Production Run 1, 5" Sch 5-11-93 CBT/New TBG/Jewelry Run 1, 5" Sch 5-10-93 Leak Detect/Spin/Temp/Press l~m 1, 2' & 5" Sch 5-4-93 USIT (Cement & Corrosion) (Color) Run 1, 5" Sch 5-3-93 Inj Proflle/Spin/Temp/Press l~m 1, 5" Sch 5-2-93 Inj Profile/PITS Run 1, 5" Sch 4-24-93 Leak Detect/Spin/Temp/Press Run 2, 5" Sch 5-7-93 D-_~! Burst/TDT-P (Borax) Run 1, 5" Sch 5-6-93 Vertilog Run 1, 5" Atlas 5-8-93 GR/Coll~r Run 1, 5" Atlas 5-6-93 Per[ Record Run 1, 5" Sch 5-7-93 GR/CCL Run L 5" Sch 5-10-93 CNL Run L 5" Sch 5-11-93 Leak Detect Run 1, 2'& [~' Sch 5-7-93 Perf Record Run 1, 5" Sch 5-9-93 TDT-P (Borax) Run 1, 5" Sch 5-3-93 Leak Detect/Spin/Temp/Press Run 1, 5" Sch 5-3-93 Per[ Record Run 1, 5" Sch 5-4-93 Production Run 1, 5" Sch 5-5-93 CCL/Per[Record l~m 1, 5" Atlas 5-8-93 SBT/GR/CCL l~_m 1, 5" Atlas Run 1, 5" Sch l~_m 1, 5" Sch l~m 1. 2' & 5" Atlas a~.]~_~z~._I4 5-7-93 GR/CCL (Color) ~'~?~AGI-5 5-1~ GR/~ (~1~) ~~I~ ~1~93 GR/~ (~1~) ~~e s~ ~d ret~ ~e a~ched copy ~ receipt of ~ RECEIVED BY_~~~ Have A Nice Day! /~~ APPROVED__~ ' ~ .~~Ttmas# 93068 # PHILLIPS PB WELL FILF~ # BPX # STATE OF ALASKA ,_? ..... STATE OF ALASKA -_ ALA:" '"' OIL AND GAS CONSERVATIOi OMMISSION REPOR I' OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator 5. Type of Well 6. Datum of elevation(DF or KB) Development X 62 RKB feet ARCO Alaska, Inc. Exploratory 3. Address Stratigraphic 7. Unit or Property P.O. Box 100360, Anchorage, AK 99510-0360 service Prudhoe Bay Unit 4. Location of well at surface 8. Well number 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM 3-19 At top of productive interval 9. Permit numbedapproval number 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 83-92 At effective depth 10. APl number 338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM 50 -029-20971 At total depth 11. Field/Pool 344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11260 feet Plugs(measured) true vertical 9232 feet Effective depth: measured 11210 feet true vertical 9185 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1990# Poleset 80' 80' Surface 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531' Production 10587' 9-5/8" 500 sx CI 'G' & 300 sx CS I 10649' 8663' Liner 888' 7" 350 sx CI 'G' 11257' 9229' Perforation depth: measured 10658-10686'; 10779-10809'; 10820-10850'; 10855-10865'; 10872-10890'; 10894-10908'; 10916-10936' true vertical 8671-8697'; 8784-8812'; 8822-8850'; 8855-8864'; 8871-8888'; 8891-8904'; 8912-8931' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 10356' MD; 4-1/2", 12.64¢, L-80, PCT tail @ 10459' MD Packers and SSSV (type and measured depth) Baker SB-3A packer @ 10336' MD; 5-1/2", Camco Bal-0 SSSV @ 2234' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached R E E E IV E P Treatment description including volumes used and final pressure D E0 - rd 1990 14. Representative Daily Average Production or Injection Data Alaska 011 & Gas Cons. C0mm'~ss~¢ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Arl-i~~ressure Prior to well operation 3090 3374 1525 -- 374 Subsequent to operation 6913 12542 6140 -- 377 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Date I?''''/''%/c~O Form 10-404 Rev 06/15/88 SUBMIT IN DUPLI DS 3-19 DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF SAG RIVER & ZONE 4 9/26/90: Replaced LGLV's w/DGLV's. 9/27/90: MIRU & PT CT to 4000 psi. RIH w/CT & tagged bottom at 11155' MD. Pumped 100 bbls of sand slurry (w/7800 lbs of 20/40 sand), to cover open perforation intervals at: 10872 - 10890' MD (Z4) Ref. Log: BHCS 6/28/83. 10894 - 10908' MD (Z4) 10916 - 10936' MD (Z4) Flushed CTw/Meth-Water. POOH. Rigged down. 9/28/90: RIH & tagged top of sand at 10819' MD. 9/29/90: Performed a fill cleanout of sand down to 10870' MD. 9/30/90: MIRU, & PT equipment to 8500 psi. Pumped a propped fracture treatment through the open perforations above the sand plug at: 10658 - 10686' MD (Sag) Ref. Log: BHCS 6/28/83. 10779 - 10809' MD (Z4) 10820 - 10850' MD (Z4) 10855 - 10865' MD (Z4) Pumped: a) 253 bbls Pre Pad, @ 55 bpm & 3300 psi, followed by b) Shutdown. ISIP @ 1550. Resumed c) d) e) pumping: 3500 bbls Cross Linked Water Pad w/Regain, @ 55 bpm, followed by 1050 bbls Slurry, w/proppant concentrations of 2 to 10 ppg, followed by 245 bbls Gelled Water Flush. Shutdown. Placed a total of 319,000 lbs of proppant into the formation, at an average treating pressure of 4000 psi. Rigged down. I 0/2/90: Replaced DGLV's w/LGLV's. 10/3/90: Performed a proppant fill cleanout to 11180' MD. I 0/5/90: Pumped scale inhibition treatment. Returned well to production, and obtained a valid welltest. P, EEEIVED D~'C -- 6 'J990 Alaska Oil & Gas Cons. Commission Anchorage ,";R C 0 AL. AS'KA: P.O. BOX i ANCHOF'..'AGE., ALA:TKA 995--i ,::) DATE iTEFEiRIENC:E' ARF:O CAZ:ED HOLE F'Ii"-.~:Ai_S" a - 'i .3 '?- 7- 9 ::_::, 9-i 8 7-6-9,:.:;: 9-.32 7-i i-?(.) c,_ ~- o 7-i 2-'90 ~, 2 '- i '2 '7- ~ '=',,.. _ o,....~:" i 2"-~ 6 7-"6-9~.~ i 6-22 i 6 - '" -z 7 - 7':;-- '.'-." ,':', i 8-i i 7-8-9(:_;, I-""'-'!"-. g u L, Ur' n , .... ~', 1' 0 N P R 0 F' I L_ ... PRODUCT ION PF.'.OFii_E LEAK DETEC'TiON I NJEC T ! ON F'ROF i Li_'£ I N,.J E C l" :if f..') N F:' F.: O F' I L. E P F;.'. O D U C 'l' i 0 N P R Ci F' .[ i.. i!: T~' 'iZ'"'FT--'~j F', ,-. .... '~.J,.~. ..... U,-, ;- F..'C,'F-il [:' F'RODUC T i Oi',i PROF i LE i r_-,',,.- T',EI .... , _ .. ,.. m. H ~, :., "~::. C"~" I F] Gl;.'. COLLAR GR ;"Oi i AR · %.. .._ ~... T 'T' LEr:~~',, DET[£CTION/F',., &' I-! A V E A i".-l, i C E D A Y ! ;~A!._i...Y I-tOFFF'C':K FZR A'TO'- i 52'"2 D i £'TR I B[J T i: ON -"- CIENTRAL FILES ~..~" CHEVRON D & H -,.'"'EXTEi'--~$ l ON. E XF'LOf{'.A T I 0~'~,, ~~ EXXON MARATHON :~ i'fi [] B I L F'H i LLi F',? !::'B WELL F'Ii...E.,:7 -.--'"' B P X · ~ ~-~'['Ai'E OF ALAi'{'i<A TEXACO ARCO ALA~£KA, iNC. P, 0. BOX- i (-) ':.'i) S 6 ,:'D ANCHORAGE, ALASKA 9951O DATE' t-S'-90 REFERENCE' ARCO~, ,~'RE~'~URE~, DATA '~-.~ °-i~) ~,, .L4HF .... FLOWING GRADIENT CAML:O .S.-i 9 6-i i -,':3'T-I BHF'--FLOWZNG Gi:;:ADIEN'i- CAMCO 6--6 9-i 4-89 BI--iP--".:,.,'TATIC. GRADIENT CAMCO 6- i ..a ,-, '-' ,",o .-. . y-F-o, BHF'--$TATI"' GRADIENT CAMCO 6-"~i~. 9'-28-89 BHP--FLOW.rNG GRADIENT. C:Ai~CO '..--.'-~ i ,:-)-i 'i -89 BHF'--FI_OWINiJ GRADIENT CAMCO 9 - ".:' '.-7--' ,-; .-~ -,. o.-~ .. ..-' - ~ o- o ..-' BI'4P--~71'AT l C C-RAi) ]: ENT CAMCO 9-3'3' ,~_'~'?_oc~, ,=, ,.,. BHF'--£TATIF:_ GRADIENT CAMCO '~' R " C,' -' T .. 9-.:~.5 9-S(D-89 ]: HF--~T~, Ir': GRADIENT CAMC:O 9-.55 9-5--89 BHP--$TATIC GRADIENT CAMCO "i6-2 9-~.3,-89 BHP--$TATZC GRADIENT CAMCO t .5-i i "=', i ....,'"'-°~,...,. BHP--,z.' TATIC Ut"..~-~,.... I EN'I' CAMCO i :3-~'~ 9-i ;5-89 BI"tP--$TATIC GRADIENT CAMCO t4-28 9-i 7-89 BHP--$TATIC GRADIENT CAMCO i4-.58 ~,-.-°-89 BHP--~TATIC GRADIENT CAMCO t5-2t 9-5-89 BHF'--$TATIC GRADIENT CAMCO i 6-2~ t t~-4-89 BHF'--S'TATIC GRADIENT CAMCO t 8-i 8 '7-.5-89 BHP--J~*TAT!C GRADIENT CAM(](] t 8-2i 7-.5-89 BHF'--S'TATIC GRADIENT CAMCO PLEASE ~,IGN AND RETURN 'THE ATTACHED COPY AS RECEIPT OF i)A'¥A~ RECEIVED BY HAVE A NICE DAY! ~ALLY HOFFECKER ATO-1~29 ' R£C£1 9 j/:kN - 8 !990 A F' F' F,' 0 V F.: D .6, DISTRIBUTION CENTRAL FILES ~ F'H ILLIF'J; CHEVRON F'B WELL' F]:L_E,S' ~~ D & M ~ R & D EXTEN£ION EXPLORATION ~ BPX $ EXXON $ ~TATE OF ALASKA MARATHON ~ TEXACO ~-"'- MOBIL ARCO Alaska, IW Prudhoe L Engineering Post Office ~ox 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 21, ±989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-19, Approval No. 8-294 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/MJB/jp Attachment cc: J. S. Dietz, BP J. Gruber, ATO-1478 PI(DS 3-19) W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany RECEIVED AUG 2 21989 Alaska 0il & Gas Cons. C0mmissl0n Anchorage AR3B--6132-C STATE OF ALASKA ALASK~OIL AND GAS CONSERVATION C~VIMISSION REPOR' OF SUNDRY WELL OF-,-'RATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well ~ Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM At top of productive interval 373' FNL, 139' FEL, Sec., 16, T10N, R15E, UM At effective depth 338' FNL, 297' FEL, Sec. 16, T10N, R15E, UM At total depth 344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM 5. Type of Well Development Exploratory Straligraphic 6. Datum of elevation(DF or KB) 62' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number DS3- 19 9. Permit number/approval number 83 - 92 / 8 - 294 10. APl number 50 - 029 - 20971 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11260 feet Plugs(measured) 9232 feet Effective depth: measured 11210 feet true vertical 9185 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 1990# Poleset 80' 80' Sudace 2469' 13-3/8" 2300 sx CS III & 400 sx CS II 2531' 2531' Production 10587' 9-5/8" 500 sx Class 'G' & 300 sx CS I 10649' 8663' Liner 888' 7" 350 sx Class 'G' 11257' 9229' Perforation depth: measured 10658 - 10686'; 10779 - 10809'; 10820 - 10850'; 10855 - 10865'; 10872 - 10890'; 10894- 10908'; 10916 - 10936'; true vertical 8671 - 8697'; 8784 - 8812'; 8822 - 8850'; 8855 - 8864'; 8871 - 8888'; 8891 - 8904'; 8912 - 8931' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 PCT w/tail @ 10356' MD Packers and SSSV (type and measured depth) Otis 9-5/8" retrievable packer @10338' MD; Otis RQM SSSV @ 2195' MD 13. Stimulation or cement squeeze summary P, fiCEIVED Intervals treated(measured) SEE ATTACHED Treatment description including volumes used and final pressure AUG 2 2 1989 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1543 2181 6752 Anchorage Tubing Pressure 325 4582 4747 377 .... 585 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Operations Engineering Manager Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE DS 3-19 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEF__.~ZE FOR WATER SHUT-OFF 5/20/88: MIRU CTU & Stimulation Equipment. PT Equipment to 4000 psi. RIH w/CT and washed perforations at: 10779 - 10809' MD Ref. Log: BHCS 6/28/83. 10820 - 10850' MD 10855 - 10865' MD 10872 - 10890' MD 10894 - 10908' MD 10916 - 10936' MD 10974 - 10994' MD Pumped the following treatment: 91 bbls 15% HCI w/25% Xylene. Displaced w/Crude. POH. Rigged down. 5/23/88: The Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 45 bbls cement, squeezing perforations: 10779 - 10809' MD Ref. Log: BHCS 6/28/83. 10820 - 10850' MD 10855 - 10865' MD 10872 - 10890' MD 10894 - 10908' MD 10916 - 10936' MD 10974 - 10994' MD Contaminated cement with 99 bbls contaminant. 5/24/88: Cleaned out contaminated cement from WB. I 1/13/88: Reperforated: 10779 - 10809' MD 10820 - 10850' MD 10855 - 10865' MD 10872 - 10890' MD 10894 - 10908' MD 10916 - 10936' MD Ref. Log: BHCS 6/28/83. 11/13/88: Added perforations: 10658 - 10686' MD Ref. Log: BHCS 6/28/83. Returned well to production and obtained valid production test. ARCO AL.A.'iCKA, INC., I'", (i, B[iX 1 (.)(-)'36(-) ANCHOF. iAGE, ALASKA I) A T E · 6-- 2 8-- 8 9 I:;,'EFEI;,'IFNC, IF' AI;,'CO cAS'ED HOLE I"-'iNAI..S '5 '"' 8 6 -' t ':.) -' 3'- t '5 6- 9'- 89 I::'l;:C) D LJ C T I (3 N F' I;,' O F I I_ E R U N t , 5:" 5 - t -:!!, 6 '" iii- 8 ? :1: N J E C l" :1:0 N. F"' I:'~" L'I I'"" I L. E I:;~ LIN. i , 5 " 3'-t <;: 6"-t ;'~ - 2 () 6 - 5'"'24 . c..,'- ',~ - o :r F' R I] D. U C i" I (3 N F' R O I::' .[ I_ E R U N t , 5.-.~6', 6-i :.."-.?--87 F:'F;:OL:,LJCT]:CIN PF;.:OFIL. E RUN I , '5" I:'I..EASE S.,'I(;N AND RETUF.:N THE A"F-f'ACHEi) COPY AS i;,'ECEIF'T OF DA'FA., C A H C (] C A H C 0 C r-:-'l ri c t] c A ti C () C r-]. H C t) C A i',i C CJ Rli:.] C E: ]: V E I) B Y HAVE A NICE DAY! ~Al~'ska 0il & ~.~po~ Commission.. RAN$~ 892'74 · ~ L':EN I'RAL. FII..ES ~: C: i..I E V F..' El N g & i'i ~ EXTENSION EXF'LOF;~AI' I CIN .,- EXXON i"iARAI'HON " :~ HOBIL · ~ F'HiLLIF'$ F'B WELL FILES' R & i) · ..'"' BF'X · ,- STATE OF ALASKA ~ TEXACO ARCO ALASKA, INC. P.O. BOX ~e8368 ANCHORAGE, ALASKA REFERENCE: ARCO CASED HOLE FINALS 3-9 ii-i3-88 COLLAR/F'ERF RUN i, 5' J-J9 it-t3-88 COI_LAR/PERF RUN t, J-25 ti-i9-88 COLLAR/PERF RUN i, 3-26 i2-i?-88 COLLAR RUN t, 3-26 i2-i6-88 VERTILOG RUN i, 5-ii ii-28-88 COLLAR/PERF RUN 7-tt t2-i7-88 COLLAR/PERF RUN ?-i9 t2-i?-88 CNL.GAMMA RUN 2, 7-34 it-ii-88 COLLAR/PERF RUN i, 5" 12-i t2-~8-88 COLLAR RUN i2-i5 i2-i4-88 MECH. PLUG SETTING RECORD RUN i, 5' i4-37 i2-i7-88 COLLAR/PERF RUN t, 5' PWDWi-i ii-9-88 CCL RUN i, PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. GEAR GEAR GEAR AI'LA~ ATLAS GEAR ATLAS ATLAS GEAR ATLAS $CH ATI_A~ GEAR RECEIVED BY___ HAVE A NICE DAY! SALLY HOFFECKER AT0-i529 TRAN$ ~88724 APPROVED DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D SAF'C STATE OF ALASKA TEXACO STATE Of ALASKA .... ' //~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971 4. Location of well at surface 9. Unit or Lease Name 76' FSL, 397' FEL, Sec.10, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 373' FNL, 139' FEL, Sec.16, T10N, R15E, UM 3-19 At Total Depth 11. Field and Pool 334' FNL, 315' FEL, Sec.16, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 62' Pad 26' ADL 28331 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 6/17/83 6/28/83 7/25/83* N/A feet MS L 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 11260'MD/9232'TVD 11210'MD/9185'TVD YES E~ NO [] 2234 feet MDI 1900' (Approx) 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR, FDC/CNL/GR/CAL, CBL, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE 'TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# U-40 Surf 80' 30" 1990# Poleset 13-3/8" 72.0# L-80 Surf 2531 ' 17-1/2" 2300 sx CS I I I & 400 s~ CS I I 9-5/8" 47.0# L-80 Surf 10649' 12-1/4" 500 sx Class G, 300 s~ CS I & 300 sx AS I (2nd Arctic Pack) 7" 32.0# S00-95 10369' 11257' 8-1/2" 350 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5½"/4½" 10459' 10386' & 1991'(csg pkr) 10658'-10686'MD/8672'-8698'TVD w/6 spf, 120° phasing 10779'-10809'MD/8784'-8812'TVD w/4 spf, 120° phasing 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10820'-10850'MD/8820'-8851'TVD w/4 spf, 120° phasing DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 10855 '-10865 'MD/8855 '-8865 'TVD w/4 spf, 120° phasing N/A 10872'-10890'MD/8871 '-8888'TVD w/4 spf, 120° phasing 10894 '-10908 'MD/8892 ' -8905 'TVD w/4 spf, 120° phasing 10916 '-10936 'MD/891 2 ' -8931 'TVD w/1 spf, 120° phasing 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 4-7-84I - F1 owing Date of Test Hours Tested PRODUCTION FOR OILoBBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 04/10/84 4.3 TEST PERIOD I~ 645 499 1 6 106/64I 774 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. I 661 500 24-HOUR RATE {~ 3600 2787 89 24.4° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. "'^ RECEIVED * NOTE: Drilled RR 7/3/83. Gyro ran 7/25/83. Workover was performed 11/8/88. DEC Aiasl~ i)ll & Gas Cons..Comml~ion '-'.~ ~chorage Submit in duplicat~v~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE WC5/048 · ..... NAME ........ " ................. InclUde interval t~ted, pressure data, all fluid~ r~over~ and gravis, MEAS. D~PTH TRUE VERT. DEPTH GOR, and time of each phase. . 0/~_Contac~ . 1111 O' 9~3 ~ ~: ~ .;, No~ ~ .-.. _ _ ...... . Top Sadlerochit 10767~ 8773~ .- · .. . , Base Sadlerochi~ No~ leach~ ~ ,', , ..,: :. ', .... .~' _ . _-,:/~: ~. .. . ';' : -' ,~ ~....,'~ : -: . .:~ : ;:. - , · , ~- .,. · · , .-L . -.~::. ; · : L : . . .- . ... ;. . . . . .; ~ -~ ~ .. . . 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing, is true a~d corr~t to the best of mY knowledge ' ' ' .... ~ -: . . '~--.: . _ ... Signed' ' ~~ Title EngineeF Date t . INSTRUCTIONS General: This form is designed for submitting a complete and. correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas ii3jection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate produdtion from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. .. ._ Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. · · .. 'l~em 27.' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- ,je~t!o_n,.Gas Injection, Shut-in, Other-explain. . .;~:ltem 28: If no cores taken, indicate "none". Form 10407 STATE OF ALASKA AI_~..,''/~A OIL AND GAS CONSERVATION COMMISo~ON REPORT OF SUNDRY WELL OPEP TIONS 1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate __ Pull tubing __ Alter casing __ Repair well __ Pull tubing "N Other ~_._. WORKOVER feet True vertical depth 80 ' TVD 2531 'TVD 8663 ' TVD 8410'-9229'TVD 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 76' FSL, 397' FEL, Sec.10, T10N, R15E, UN At top of productive interval 373' FNL, 13,9' FEL, $ec.16, T10N, ELSE, UN At effective depth 338' FNL, 297' FEL, Sec.16, TION, R15E, UM At total depth 344' FNL, 315' FEL, Sec.16, TION, R15E, UM 5. Type of Well: ~ Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) RKB 62 ' 7. Unit or Property name Prudhoe Bay Unit 8. Well number 3-19 9. Permitnumbedapprovalnumber 83-92/8-109 10. APInumber 50-- 029-20971 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11260'MD 9232'TVD feet Plugs (measured) feet None Effective depth: Casing Structural Conductor Sudace Intermediate Production Liner Perforation depth: measured true vertical Length 11210'MD 9185 ' TVD Size feet Junk (measured) None feet Cemented Measured depth 80' 2497' 20" 1990 # Poleset 80'MD 13-3/8" 2300 sx C$ III & 400 sx CS II 2531 'MD 10619' measured true vertical & I88 fPi'(c- cs ,, sx 2~d Arctic pacK) 888' 7" 350 SX Class G 10369'-11257'MD 10658'-10686'MD, 10779'-10809'MD, 10820'-10850'MD, 10855'-10865'MD, 10872'-10890'MD, 10894'-10908'MD, 10916'-10936'MD 8672'-8698'TVD, 8784'-8812'TVD, 8820'-8851'TVD 8855'-8865'TVD, 8871'-8888'TVD, 8892'-8905'TVD, 8912'-8931'TVD Tubing (size, grade, and measured depth) 5½"/4%", L-80, tbg w/tail @ 10459' Packers and SSSV (type and measured depth) Camco 'Bal-O' SSSV ~ 2234', Baker 'SB-3A' pkr ~ 10386', & Baker 9-5/8" csg pkr (~ 1991' 13' Stimulati°n °r cement squeeze summary RE6EiVED N/A Intervals treated (measured) Treatment description including volumes used and final pressure .;:;ia;;ka Oil & Gas Cons, Commission 14. N/A Representative Daily Average Production or Injection Data '" '. ~,ncn0rage OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations "'v 16. Status of well classification as: Oil'S__ Gas __ Suspended __ Service 1Z Iherebycerti~thattheforegoingistrueand cormcttothe bestofmyknowledge. Signed ~'7-,~' ~ Title Reqional Drillinq Enqineer Form 10-404 Rev06~5/88 ~ (Pani) 5W03/068 *Workover Well History S U B M~a¢~N '/~D U p~'i~CA~TE ARCO Oil and Gas Company Well History - Initial Report - Daily Instruclions: Prepare and submit the "Initial Reporl" on the first Wednesday after a well is spudded or worKover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District I County. parish or borough ARCO ALASKA INC. J NORTH SLOPE Field ~Lease or Unit PBO I ADL: 28331 Auth. or W.O, no. ~Title AS2459 I WORKOVER J St at;%K DS 3-!9 iwe, no. API: 50-029-20971 Operator ARCO Spudded or W.O. begun ~Date ACCEPT I 10/24/88 Dele and depth as of 8:00 a.m. 10/24/88 ( TD:11260 PB:11222 SUPV:TJ 10/25/88 ( TD:11260 PB:11222 SUPV:TJ 10/26/88 ( TD:11260 PB:11222 SUPV:TJ 10/27/88 ( TD:11260 PB:11222 SUPV:DCS 10/28/88 ( TD:11260 PB:11222 SUPV:DCS 10/29/88 .( TD:11260 PB:11222 SUPV:DCS 10/30/88 ( TD:11260 PB:11222 SUPV:DCS Complete record for each day repo~ed POOL #102 I ARCO W.I. I H°ur 2000 J 21.0000 . I Prior status if a W.O. NU BOPE MW: 8.5 SEAWATER MOVE RIG F/3-15, ACCEPT RIG @ 2000 HRS, 10/23/88. TEST CHOKE MANIFOLD, BLEED ANNULUS, SET BPV, ND TREE, NU BOPE. DAILY:S33,475 CUM:$33,475 ETD:S33,475 EFC:$961,000 POOH W/ TBG MW: 8.5 SEAWATER NO BOPE & TEST, ATTEMPT TO SHEAR OUT OF SEAL ASSY, RIH W/ JET CUTTER, CUT TUBING @ 10279', DISPLACE WELL TO SEAWATER, POOH LD TUBING. DAILY:$34,268 CUM:$67,743 ETD:S67,743 EFC:$961,000 RIH TO RET.PKR. MW: 8.5 SEAWATER POOH W/ 5-1/2" TUBING, HOLE IN TBG @ 4200', SBR HAD SHEARED & FULL STRING WAS RECOVERED, RIH W/ OVERSHOT TO PULL RETRIEVABLE PACKER. DAILY:S26,855 CUM:$94,598 ETD:S94,598 EFC:$961,000 LD COMP. ASSY. MW: 8.5 SEAWATER RIH W/ OS ON DP, TAG SBR, ENGAGE PKR & SHEAR TO RELEASE, CBU, POOH LD PKR AND COMPLETION ASSEMBLY. DAILY:S29,823 C0M:$124,421 ETD:S124,421 EFC:$961,000 PULLING PACKOFF MW: 8.5 SEAWATER LD PKR, SET 7" EZSV @ 10490', TEST 9-5/8" CASING TO 2500 PSI, RUN CET F/ 2600 TO SURFACE, DISPLACED TOP 2300' W/ DIESEL, POOH, RIH W/ 9-5/8" CASING CUTTER, CUT CASING @ 2000',POOH, SPEAR CASING & ATTEMPT TO PULL, PULL PACKOFF. DAILY:S58,029 CUM:$182,450 ETD:S182,450 EFC:$961,000 MU BIT & SCRAPER MW: 8.5 FSW PULLED 9-5/8" MANDREL HANGER PACKOFF. ATTEMPTED TO PULL 9-5/8" CASING W/ SPEAR, NO SUCCESS. RIH AND CUT 9-5/8" CASING WITH MECHANICAL CUTTER AT 1999'. RIH, SPEAR AND PULL 9-5/8" CASING. MU 12-1/4" BIT AND 13-3/8" CASING SCRAPER. DAILY:S33,066 CUM:$215,516 ETD:S215,516 EFC:$961,000 MU CSG BACKOFF TOOL MW: 8.5 FSW RIH W/ 12-1/4" BIT AND 13-3/8" SCRAPER, TAGGED TOP OF 9-5/8" CASING STUB AT 2000'. DISPLACED ARCTIC PACK OUT OF HOLE. RIH W/ CSG BACKOFF. TOOL AND ATTEMPTED BACKOFF, NO SUCCESS. RIH W/ SPEAR, SPEARED 9-5/8" CSG AND SHOT STRING SHOT BACKOFF AT 2032'. POOH W/ SPEAR AND MU CSG BACKOFF TOOL. DAILY:S29,900 The above is correct see Procedures Manual, Section 10. . __ ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formalion name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Secllon will be reported On "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "lnlarim" sheets when filled out but not lees frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following selling of oil strin§ until completion. District ICounty or Parish NORTH SLOPE Lease or Unit DS 3-19 Field ARCO ALASKA INC. PBU Date and depth as of 8:00 a.m. 10/31/88 ( TD:l1260 PB:11222 SUPV:DCS 11/01/88 ( TD:11260 PB:11222 SUPV:DCS 11/02/88 ( TD:11260 PB:11222 SUPV:DCS 11/03/88 ( TD:11260 PB:11222 SUPV:TJ 11/04/88 ( TD:11260 PB:11222 SUPV:TJ 11/05/88 ( TD:11260 PB:11222 SUPV:TJ IWell no. Complete record for each day while drilling or workover in progress POOL #102 8) 2) FISHING CSG SPEAR MW: 8.5 FSW RIH W/ CSG BACKOFF TOOL AND ATTEMPTED BACKOFF, ACHIEVED 4-1/4 TURNS TO THE LEFT AT SURFACE. POH W/ CSG BACKOFF TOOL AND RIH W/ 9-5/8" CASING SPEAR. TESTED ARCTIC PACK CEMENT, INJECTION RATE 3 BPM AT 900 PSI. ENGAGED 9-5/8" CASING W/ SPEAR AND ROTATED TO THE LEFT, POH, LEFT CASING SPEAR AND 2 JOINTS OF DP IN THE HOLE. RIH W/ OVERSHOT, ENGAGED DP, ROTATED RIGHT TO RELEASE SPEAR, POH, NO RECOVERY. REDRESS OVERSHOT, RIH AND ENGAGE DP, ROTATE RIGHT TO RELEASE SPEAR. DAILY:S29,710 CUM:$275,126 ETD:S275,126 EFC:$961,000 RIH W/ 9-5/8" SPEAR MW: 8.5 SEAWATER POOH W/ OS ON 3-1/2" DP, MU 9-5/8" SPEAR ON 5" DP, ENGAGE 9-5/8" @ 1999', ATTEMPT TO BACK-OUT, POOH LD SPEAR, MU BACKOFF TOOL, RIH & CYCLE TOOL FOR 12 TURNS, POOH, MU 9-5/8" SPEAR & RIH. DAILY:S37,625 CUM:$312,751 ETD:S312,751 EFC:$961,000 ND BOPE MW: 8.5 SEAWATER SPEAR 9-5/8" CASING & BACK-OUT, POOH LD CSG, RIH W/ 11-3/4" WP, WASHOVER COLLAR @ 2029, CBU, POOH LD 5" DP, RIH W/ SCREW-IN SUB, 9-5/8 x 13-3/8" PKR, ON 9-5/8" BTC-MOD CASING, SCREW INTO CASING & PRESSURE UP TO 600 PSI, ND BOPE DAILY:S128,322 CUM:$441,073 ETD:S441,073 EFC:$961,000 RIH W/ 6" MILL MW: 8.5 SEAWATER PU 9-5/8" CASING TO 170 K, SET SLIPS, CUT CASING, INSTALL PACKOFF, NU BOPE, TEST PACKOFF, PERFORM DOWN SQUEEZE ARCTIC PACK, USING 300 SX AS I, PRESS 9-5/8" CSG TO 2700 PSI TO SET PKR & TEST CASING, RIH W/ 8.5" GR/JB, STOPPED AT 5050', RIH W/ 6" MILL, CIRC @ 5200' TO REMOVE ARCTIC PACK, RIH. DAILY:S91,231 CUM:$532,304 ETD:S532,304 EFC:$961,000 RIH W/ NEW MILL MW: 8.5 SEAWATER RIH W/ 6" MILL, ROTATE INTO TOP OF LINER, MILL WITH HIGH TORQUE, POOH, RECOVER 10 LBS. OF METAL, RIH W/ NEW 6" MILL. DAILY:S31,694 CUM:$563,998 ETD:S563,998 EFC:$961,000 POOH INSPECT DP & BHA MW: 8.5 SEAWATER MILL ON PLUG @ 10490', CHASE PLUG TO 11048',BRAKE LINKAGE FAILED, DROPPED BLOCKS DAMAGE TO KELLY & BLOCKS. STRING NEW BLOCKS, CUT 400' DRLG LINE INSTALL NEW KELLY. CONT POOH TO INSPECT PIPE AND BHA. DAILY:S33,527 CUM:$597,525 ETD:S597,525 EFC:$961,000 The above is correct [.. For form prepa'ration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ARCO Oil and Gas Company 4~, Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, Or perforating, show formation name In describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerlm" sheets until final completion. Report official or representative lest on "Final" form. 1) Submit "lnlarlm" sheets when filled out but not less Irequenlly than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following selling of oil string until completion. ICounty or Parish JStat~ll~( District ARCO ALASKA INC. NORTH SLOPE Field ILease or Unit PBU [ DS 3-19 I IWell no. Date and depth as of 8:00 a.m. 11/06/88 ( TD:11260 PB:11200 SUPV:TJ 11/07/88 ( TD:11260 PB:11200 SUPV:TJ 11/08/88 ( TD:11260 PB:ll200 SUPV:TJ Complete record l~)~.~,h ~a,~ ~ile drilling or workover in progress 4) DISP W/ TREATED SEAWATER MW: 8.5 SEAWATER POOH LD BHA, MU NEW KELLY & TEST, PU 6" MILL, 2BB'S, COLLARS AND BENT DP RIH, POOH LD BENT DP, PU NEW DP, RIH TAG BP @ 10994', PUSH TO 11200', CIRC HI VIS HEC PILL, DISPLACE WELL TO TREATED SEAWATER. DAILY:S40,810 CUM:$638,335 ETD:S636,835 EFC:$962,500 POOH LDDP MW: 8.5 SEAWATER DISPLACE WELL TO INHIBITED SEAWATER, POOH, PU 6" MILL, 2 BB, 30 JTS, 9-5/8" SCRAPER, CONT RIH TO 11200', REVERSE CIRC BTMS UP, POOH LDDP. DAILY:S34,473 CUM:$672,808 ETD:S671,308 EFC:$962,500 TESTING TBG ANNULUS MW: 8.5 SEAWATER POOH LDDP, CHANGE RAMS, RIH W/ 5-1/2" COMPLETION ASSEMBLY, MU HGR, LAND TUBING SET PACKER @ 10336(WLM}, PU TO SHEAR SEAL ASSEMBLY, LAND TBG & RILDS, PRESSURE UP ANNULUS TO 2500 PSI. NOTE: CAMCO 'BAL-O' SSSV @ 2234', BAKER 'SB-3A' PKR @ 10386', & TT @ 10459'. DAILY:S284,166 CUM:$956,974 ETD=S956,974 EFC:$961,000 The above is correct For form preparat~'on and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the firsl Wednesday after allowable has been assigned or well Is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting Ihe entire operation if space is available. District ~County or Parish ARCO ALASKA INC. I' NORTH SLOPE Field I Lease 'or Un"~"~---- -- PBU / ADL: 28331 DS 3-19 Auth. or W.O. ~2459 ITitle WORKOVER I Accountlng cost center code Stet~ IWell no. Operator ARCO ~.~.Co. ~.:~. 0000 Spudded or W~i~C~% 1Date 10/24/88 Date and depth Complete record for e§c.h,,,d,.ay reported as of 8:00 a.m. ~L 11/09/88 ( 1 TD:11260 PB:11200 SUPV=TJ Old TD New TD Released rig Date 50-029-20971  otal number of wells (active or inactive) on this. est center prior to plugging and 1 donme.~__nt of t._.~his well 2000 HRS I'67~ ~'a~'~ ~ ~ w'°' WAITING ON WEATHER MW: 6.7 DIESEL TEST TBG AND ANNULUS. NO AND TEST TREE. DISPLACE WELL W/ DIESEL. SHEARED OUT. CLEAN PITS. SECURED WELL. RIG RELEASED AT 2300 }iRS, 11/08/88. WAIT ON WIND TO MOVE RIG. DAILY:S65,033 CUM=$1,022,007 ETD:S1,022,007 EFC=$961,000 K~iBnDepth Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. tDate Pump size, SPM X length The above is correct · For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 88 and 87. Reservoir Producing Interval Oil or gas Choke size Water % Test time Producllon Oil on test Gas per day Gravity Allowable Effective date corrected ARCO ALASKA., INC~ P.O. BOX ANCHORAGE, ALASKA DATE' tt-4-88 REFERENCE ~.~i 5-2i i '7-6 ,~ti °-i PLEASE: : ARCO CASED HOLE FINALS i0/i-2/88 FLUID DENSITY i 0-24-88 CNL-GAMMA i O-i 9-88 VERTiLOG i~/i-S/88 TEMP SURVEY i ~-24-88 COLLAR i0-27-88 CCL-F'I_UG SETTING i ,:3-27-88 CET 9-28-88 COLLAR/F'ERF 9'-~6/~7-88 COLLAR/F'ERF 9-i 6-88 COLLAR/F'ERF in~_~_oo~,~ PROD~JCTION PROFILE i~'-S-88 INJECTION PROFILE 9-22-88 INJECTION PROF'ILE 9-26-88 PRODUCTION PROFILE i~-i-88 PRODUCTION PROFILE 9-i 9-88 COI_LAR/F'ERF i ~-7-88 GAMMA-COLLAR i ~-9-88 GAMMA-CCL i ~)-8-88 COLLAR 9-S,2,- 88 F'RODUCTION PROFILE 9- i 4-88 COLi_AR/F'ERF ~ n-'~-88 PIT~ RECEIVED BY .... RUN RUN i, RUN i , RUN i , R U N i, 5 RIJN i , $' RUN i, F;:tJN i, 5' RUN i, D ' R~JN t, 5' RUN i, S' RtJN t, S' RUN t, R~JN RUN t, R(JN t , S' RUN i, 5' RUN i, 5' RUN t, S' F,'tJN t, S' RUN i , ~' RUN R. UN t, D' RUN t , S' DATA HAVE A NICE DAY! SALLY HOFFECKER AT0-i5'29 DISTRIBUTION A PF'R O V E I;'___~.._. ~,..= .~ ....... '" ~'_._ ~ .... ~~:i'~'~ ~,s Cons. Commissbn Anchorage CENTRAL FILES CHEVRON . EXTENSION EXPLORATION EXXON . MARATHON MOBIL PHILLIPS 1' F'B WELL FILE:,;' ~- SAF'C · .- ATE OF- AI_ASI<A ~ TEXACO CAMCO Al'LAS A'FLA.S' CAMCO ATL. A?; $CFt (:;' E A F;,' G E A R ., E i-~ .,, C A M C 0 CAMCO C A M C 0 C A i'd C 0 CA~CO ATLAS GEAR CAMCO CAMCO CAMCO CAMCO GEAR C A i'q C [J A'f I_AS THESE LOGS HAVE 7"":33 i=:'- 6, A _; i I'FIF:' L:OF;..'RE C i' NOS ARE' D ¢-,'r .F; · F;.'F:'C'c'q'F'Ht-;c'' ARf:(] F:~,g'F'..D ,LIf'll..F:' F'Ti'-J¢'~l · ~ L.I ...~'. ~! ............. f'~ A i'4 f": f'l f; F:' A fi". A H fi'.' ri f;': A H f".' f'l C A H r: r) f'; F-i' .A F;: I'; I'= A R' [;;: r:'.'-, H f": f": ¢, H F: f".' A H f": ['i f": ¢..; H f": f'i fi ~.':; i'-.i f": f'i I:;: I::' C' [!: I: V F-!' D B Y ............................................................................. AF,'I:R A! A.'~Kh. TNt'.. F'. FI. T',.[1Y. t ANF:FtFi[~'Ar;F. Al A.?KA D~TF' RI:.'.I:rE'RFNP, F~' AR'[;R P.A.~F..D Hi'll F F"TNAI. ~-t t ,A-i -RFR .T.N..Ir-.71'~T.'[IgN F'ROF.TI..F - R'I.IN i .-4 . Z-I t 6-t-RR ,~PTNNF'R'/TFMF'I=R~TilRF ,~ilRVFY F,'IlN t ~ , 4-i,~. .5-.-i9-RR .T.N,IF..CTTON F'r4.'FIF'TI..F. RI.IN t-4, 4-.i ..'3. 5-t 9-8R TFMI::'F.-.'RATI. IRE ,~Uf-;.'VF'Y R'tllg i -4: 7-29 6-8-RR ,gD.I.IF_F.7_F F'ERFOF.'ATTNR-R'FCFIRD R'IIN i. · .. F'I.F'.A,~F..7. ,~TT[~.N ANT) RETI.!R'N THF' ATT¢,CFIET) f]F.'IF'Y AY REr..EIF'T OF' DATA,. HAVE A N!F:.F-. DAY' I ?' ]988 F'FF;~Y RF. NNFTT ~ Alaska Oil & Gas Cons. Commission A T R- ~ =... ':, o ~,nc,orage . . ,...,_.. ? .. ~ ~ .... T) T..: TE'T R1 IT T FIN · "- F: F' i'-,! T F;.' A 1 F .T.I._F..? ~ EXTFN,~ION FXPI. OR'A'FTON ~... EXXON MARATHON $ - MOB !'!.. - FITT ~" mT T .? F1T .T .~' flTT,~ ARCO Alaska, Inc. r ~ ' Prudhoe Bay ~.,~gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 19, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 3-19 Permit No. 83-92 Dear Mr. Chatterton: Attached is the Application for Sundry Approval performed on the above-referenced well. Very truly yours, detailing work to be D. F. Scheve DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 3-19)W1-3 WELLS2/122 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C ~-" : STATE OF ALASKA ALAS~... OIL AND GAS CONSERVATION COMM...,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~. Operation Shutdown r- Re-enter suspended well ~ Alter casing ' Time extension [] Change approved program ~ Plugging [] Stimulate [] Pull tubing ,rq.. Amend order D Perforate~ Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM At top of productive interval 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM At effective depth 338' FNL, 297' FEL, Sec. 16,' T10N, R15E, UM At total depth 344' FNL, 315' FEL, Sec. 16, T10N, R15E, UM 5. Datum elevation (DF or KB) 62' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 3-19 feet 8. Permit number 83-92 9. APl number 50-- 029-2097] 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 11260 ' feet 9232 ' feet Plugs (measured) RECEIVED Effective depth: measured 11210 ' true vertical 9185 ' Casing Length Size Conductor 80 ' 20" Surface 2497 ' 13-3/8" Production 10619 ' 9-5/8" Liner 888' 7" Perforation depth: measured true vertical feet feet Cemented 1990# Poleset 2300 sx CS III & 400 sx CS II 500 sx Class G & 300 sx CS I 350 sx Class G Measured~rage 80' 2531' Junk (measured) APR 2:0 :i!:lii[; Alaska 0il & Gas Cons. Commission True Vertical depth 80' 2531' 10649' 8663' 10369-11257' 8410-9229' 10779-10809' 10820-10850' 10855-10865' 10872-10890' 10894-10908' 10916-10936' 10974-10994' , , Tubing (size, grade and measured depth) 5~"a , 17#/ft, L-80 tubing w/tail @ 10417' Packers and SSSV (type and measured depth) Otis 9-5/8" retrievable pkr @ 10338'; Otis "ROM" SSSV @ 2195' 12.Attachments Description summary of proposal ~ Detailed operations program 8784-8812' 8820-8851' 8855-8865' 8871-8888' 8892-8905' 8912-8931' 8966-8985' , , BOP sketch 13. Estimated date for commencing operation May 1, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby,.,certify that the foregoing is true and correct to the best of my knowledge Signed ,~JJ~,,,,,~~ Title Operations Engineerin~ Manager Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity ~ BOP Test ~ Location clearance I Date ~z//~,/~. ~-' ~ORIGINAL SIGNED BY LONNIE C. SMITH Approved by Approved Copy Returned _ ~ Commissioner Form 10-403 Rev 12-1-85 I¢i~.T.T..q9/I 79 T')_ lyf. F-ifc_. 263-4278 by order of the commission Date '~' --~'(~ ~): Submit in triplicate~., DS 3-19 CTU Cement Squeeze AFF~ 797961 Procedure 1. Make a slickline tag nm to verify thc PBTD. Last PBTD was 11210' MD (ELM) on 1-25-88. 2. Perform a dispersed xylenedHCl, full strength mud acid wash. If thc wells capacity increases dramatically, repeat the acid wash. 3. RIH with coiled tubing and fluid pack the wellbore with fdtered seawater. 4. Pump 40 bbls of cement followed by 2 bbls of water and 80 bbls of contaminant. Hold 5100 psi (bottom hole) squeeze pressure for 60 minutes. Squeeze off all perforations as follows: Zone Current Perfs Shot Densi _ty Z1 10779-10809 6 Z1 10820-10850; 6 Z1 10855-10865 6 Z1 10872-10890 6 Z1 10894-10908 6 V2 10916-10936 '4 V2(3) 10974-10994 4 Jet or reverse out the contaminated cement. 6. Perforate as follows (Ref.: BHCS 6-28-83): Zone Provosed Perfs Sag 10i558-10686 Z1 10779-10809 Z1 10820-10850 Z1 10855-10865 Z1 10872-10890 Z1 - 10894-10908 V2 10916-10936 Shot Density FSD FSD FSD FSD FSD FSD FSD Reperf Reperf Reperf R~n'f Reperf Reperf 7. Test the well. Other Well Information: Current status: On production - gas lift. Expected static bottomhole pressure: 3840 psi. Expected fluid in wellbore at repea'f~tion: seawater. 4 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) · 3.,5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF RECEIVED Alaska Oil & Gas Cons. Commlsslor, Anchorage H]RELINE BOP EOUIPHENT 6 5 4 3 2 i 1 I 1. 5000 PSI 7" WELLHEAD C:ONNECTOR FLANOE 2. 5000 PSI 4 1/16" PIPE RAMS ,3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. .5000 PSI 4 1/16" STUFFING BOX Oil & Gas Cons. Commission' CO]LED TUB]NO UNIT BOP EOU]PMENT i i i i i __ ARCO AL. AXKA , P.D. BOX ANCHORAGE, AI_AXKA 995t DATE' 2-25-88 REFERENCE: ARCO CA~ED HOLE FINAl._ f~-t4 "~ t4-24 2-~-88 COl._EAR/PERFORAT I ON t -25-88 £ONAN 2-4-88 C 01._1._ A R/PERFORAT I AN 2-5-88 CD[..L AR/PERFORAT.T ON t 4-2t t-22-88 PROI~.TION PACKER r~ v_. F~WN~... L)A¥'.~'"' /~,c~o~' g RI.IN RUN RI.IN RI.IN RUN OF DATA~ PEGGY BENNETT AT0-t529 TRAN$ ~88i26 f~ APPROVED DISTRIBt. JTTON ATI..A£ ATI_.Ag ATI...A~ ATI..A~ ATI...A~ CENTRAl_ FILES CHEVRON D & M EXTEN£ION EXPLORATION EXXON ~ARATHON -- HOBII_ "'.,- F'HII_t..IP$ PR WELL F.T.I..EX ~ ~ ,.~APC '~ . - ~ ?',~TATE' "OF. ALA.~KA ' TEXACO STATE OF ALASKA ALAS, .., OIL AND GAS CONSERVATION COMN,..~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~., Suspend ~, Operation Shutdown [] Time extension ~ Change approved program ~ Plugging [] Stimulate [] Pull tubing,~ Amend order [] Perforate ~ Other ."~.. 2. Name of Operator ARCO Alaska~ Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 76' FSL, 397' FEL, 5ec.10~ TION, R15E, UM At top of productive interval 373' FNL, 139' FEL, 5ec.16, T10N, R15E, UN At effective depth 338' FNL, 297' FEL, 5ec.16, TION, R15E, UM At total depth 344' FNL, 315' FEL~ Sec.16, TiON, R15E, UM 11. Present well condition summary Total depth: measured true vertical Effective depth: 11 260 , M D feet 9232'TVD feet · measured 11 21 0 'MD true vertical 91 85 ' TVD Length Size 80 ' 20" 2497 ' 1 3-3/8" Casing Conductor Surface P roducti on 1 061 9 ' 9-5/8" Li net 888 ' 7" Perforation depth: measured Re-enter suspended well [] ~ter; casing .~. 5. Datum elevation (DF or KB) RKB 62 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 3-19 feet 8. Permit number 83-92 9. APl number 50-- 029-2(}~71 10. Pool Plugs (measured) Prudhoe Bay Oil Pool None RECEIVED feet Junk (measured) None feet Alaska Oil & Gas Cons. Commis$i0:~ Cemented Measured depth AT~,,l~aical depth 1990# Poleset 80'MD 80'TVD 2300 sx CS Ii I & 2531 'MD 2531 'TVD 400 sx CS II 500 sx Class G & 10649'MD 8663'TVD 300 sx CS I 350 sx Class G 10369'-11257'MD 8410'-9229'TVD 10779'-10809' , 10820'-10850' 10894'-10908', 10916'-10936' true vertical 8784 ' -881 2 ' , 8820 ' -8851 ' 8892'-8905' 8912'-8931 ' , Tubing (size, grade and measured depth) 5-1/2", 17#/ft, L-80 tubing w/tail ~ 10417' Packers and SSSV (type and measured depth) Otis 9-5/8" retrievable, pkr ~ IO~R'~ n~ "~g~" $$$V ~ 2!95' 12.Attachments Description summary of proposal 'j~ Detailed operations program , 10855'-10865', 10872'-10890' , 10974'-10994' , 8855'-8865', 8871'-8888', , 8966'-8985' BOP sketch 13. Estimated date for commencing operation March 1, 1988 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knoWledge Signed (~~ ~ ~, Conditions of approval Approved by ORIGINAL SIGNED BY Form 10-403 Rev 1~': u, SM~H Title Associ ate Eqgi n~¢r Commission Use Only ( J G ) Notifycommission so representative may witness } Approval [] Plug integrity [] BOP Test [] Location clearanceI ADP'ovid Copy Returned Commissioner Date SA3/63 the commission Date Submit in triplicate PBU DS 3-19 PROCEDURE OBJECTIVE: Retrieve the existing 5-1/2" tubing and Otis retrievable packer. Squeeze a water channel below the existing perforations in addition to the entire perforated interval. Cut, pull, and replace the 9-5/8" BTC casing above +2200'MD with new 9-5/8" Mod-BTC casing· After successfully testing the new 9-5/8" casing and drilling out and testing the squeezed perfora- tions, 5-1/2" Mod 8rd IPC Class A and B tubing with GLMs and a permanent packer will be installed. Production will reperforate the well after the rig moves off. 1) MIRU slickline. Pull equalizing dummy valve from lowest GLM. RD. 2) MIRU workover rig. Circulate seawater through tubing and annulus. 3) Set BPV. ND, NU, test, retrieve BPV. 4) Release packer and POOH w/5-1/2" tubing and packer· 5) RU electric line. Shoot 7" squeeze perfs. RD. 6) RIH w/DP. Acidize and cement squeeze entire perforated interval. POOH· 7) RIH with RTTS and test squeeze to 2500 psi. 8) Circulate 2300' diesel cap. RECEIVED 9) RIH, mechanically cut 9-5/8" casing at +2200'MD. 10) Pull 9-5/8" casing. 11) Roundtrip 13-3/8" scraper and 12-1/4" bit to top of cut · 12) Test Arctic pack to 2000 psi. 13) RIH, back off 9-5/8" casing at 2260'. POOH. 14) RIH, recover 9-5/8" casing stub. POOH. 15) Run new 9-5/8" Mod-BTC casing with external casing packer. 16) Circulate oil base fluid into 9-5/8" x 13-3/8" annulus. 17) Screw into 9-5/8" BTC casing with new Mod-BTC casing. 18) Test 13-3/8" x 9-5/8" annulus to 2000 psi. 19) Set 9-5/8" external casing packer. -2- 20) ND BOPs, install slips, cut casing, install packoff, NU and test BOPs. 21) Test casing and squeeze to 2500 psi. 22) .RIH and clean out to PBTD at 11210'. 23) Test squeezed perfs to 1000 psi. 24) RIH with 9-5/8" packer and tailpipe on DP, set, POOH and LDDP. 25) Test 9-5/8" casing and packer to 2500 psi. 26) RIH with 5-1/2" tubing and GLMs. 27) Freeze protect well, ND, NU, test, release rig. BHP = 3840 psi @ 8862'TVD (8.33 ppg EMW) Workover fluid = 8.5 ppg seawater DCS/12 2/23/88 ANNULAR PREVENTER 6 PIPE RAMS 5 BLIND RAMS 4 TUBING HEAD 2 i I ~-'~iR" CASING u~-, ~, · . ._- ..... ~ ,C./-~.L.J 9-5/8" CASING HEAD 3 5000 PSi ~ '~' "' ~ .... L,,_,, N,_', HeAD 4. 13-5/'8" - 5000 PS! BLIND RAMS ~ 1.- ..... H 5000 Pq', m'PF PAMq 6. 13-5/8" - 5000 PSI ANNULAR · . . . , i0. 1i 12 13 I,-.1 ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC PEPORT. THE ACCEPTABLE LOWER LIMIT iS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT iN WELLHEAD· RUN IN LOCK-DOWN SCREWS IN HEAD. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MII"IUTES. BLEED TO -ZERO PSI. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE P. Ar'IS. INCREASE PRESSURE TO 5000 PS! A.,"-;D HOLD FOR !0 MINUTES. CLOSE VALVES Di..E~,L~. uPSTREAM OF CHOKES. BLEED DOWNSTPEA; ~, ~. '~ ~- ¢", ~- ~/'"~'~ TEST PEMA. INING L,4TE:,~_u oRESSURE. '~A, ,,, ZERO PSi TO T,_=.T , ,-.~_ ,, ~¢. MANIFOLD VALVES, !F ANY. WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTPE"~ =" . . ~,':. ~., .... SYSTEM TO ZERO PSI. OPEN PiPE ~AM$. 5ACK. OFF PUNN!HGJTAND PULL OUTOF HOLE. DL:u~u x .......... ~,~, ', ~ I FOR ~0 ........... BLEED TO ZERO PSi. OPEN ELiNDRAMS ANDRECOVEP. TESTPLUG. MAKE SUrE MANIFOLD LINES APE: ' ' _ ~ ULL OF ARCTIC DiESeL AND ALL VALVES ARE 3ET IN DRILLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI. ~ ~/~' ~, ~- _- .. _ ' ~ , ,_. , ~o, ~LL'f ¢'Q(-'~"~; AND !HSiDF BOP TO 5000 PSI ',/TH KOOMEY D, ir'lP RECORD TEST iNFORMATiOh ON 6LOWOUT PREVENTER TEST FOPM. AND SEHD TO DRiLLiNG SUPERVISOR. PERFORM COMPLETE BORE TEST ONCE A WEEK AND FLINCTtONALLY OPERATE BORE DAILY. JO NOVEMBER 21, I'286 ARCO Ataska, Inc. P.O. Box t0036e Anchorage, Alaska 995te DATE: June 2 7,t986 REFERENCE: ARCO Cased Hole Fine[ 6-t 4-86  -9 6-~ 9-86 -t? 6-~ 5-86 -~-'3-2 t 6-t 8-86 '"'"4-25 5-2e-86 -~'--.-4-26 5-2t -8~ -'~ 8-B 5-6-86 Spinner Survey Run t 5' GR Spinner tog Run i 5' Spinner log Run t 5' GR/$p inner tog Run t 5' GR/$pinner log Run i 5 · Cement bond log Run t 5' Cement bond log Run t 5' Cemnet bond log Run t 5' Otis Camco Camco Camco Camco Gearhart Gearhart Gearhart Please sign and return th.p~a.t.~tached COpy as receipt Rece i ved By ...... ~ -'' HAVE A NICE ..~. y: ~ ?.~'.-.s:.~~ Linda Hulce ATO-t 529 TRANE ~86403 of data. DISTRIBUTION Central Fi les Chevron D&M Extenzion Exploration Exxon Hare thon Mobil Phi llips F'B Well Fi les $oh i o State of Alaska Texaco STATE OF ALASKA AL .KA OIL AND GAS CONSERVATION CL .¢IISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ,~ Stimulate Fl Plugging Fi Perforate ~ Pull tubing A -~ CANCELLATIONOF REQUEST Alter L;asing ~ Other ~ 2. Name of Operator ARCO AlaSka. Inc. 3. Address P,O, Box 100360 Anchorage~ AK 4. Location of well at surface 5. Datum elevation (DF or KB) RKB 62 ' Feet 99510-0360 6. Unit or Property name Prudhoe Ba;y Unit 7. Well number 76' FSL, 397' FEL, Sec.10, T10N, R15E, UM At top of productive interval 373' FNL, 139' FEL, Sec.16, T10N, R15E, UM At effective depth -- At total depth 334' FNL~ 315' FEL~ Sec.16~ T10N~ R15E~ UM 11. Present well condition summary Total depth: measured true vertical feet feet 3-19 8. Approval number R%-q~ fP~.rmit NHmh~.r) 9. APl number 50-- 029-20971 10. Pool Prudhoe Bay Oil Pool Plugs (measured) Effective depth: measured true vertical feet feet Junk (measured) Casing Length Size Cemented Measured depth True Vertical depth Perforation depth: measured true vertical Tubing (size, grade and measUred depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary N/A Intervals treated (measUred) Treatment description including volumes used and final pressure 13. N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run C 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~, ~/')4~,'L_/ ~'Z~ .,.,//..t¢._~l_/ Form 10-404 Rev. 12-1-85J Title Associ ate Engineer (JG) SW02/108 Date Submit in Duplicate/q/ DS 3-19 REPORT OF SUNDRY WELL OPERATIONS The work described in our Sundry Notice, dated 10/28/85, has not been done and is not scheduled to be done in the immediate future. Therefore, please cancel our request to perform a workover on this well. P t--,~t'~,,.,., .,., Oil,_,.~. [las (]ohs. Comml~si~ ,, Anchora.g[~ SW02/108a 10/13/87 ARCO Alaska, Inc. P.O. Box t00;560 Anchorage, Almskm 99~0 DATE' August :;5~, ~987 REFERENCE' ARCO ca~wd 14o I e ~i'nm ~ ;'~--:5 8-8--87 F'rod. Profi [e Run ~, 5" 3-~9 8-~-87 Prod. ProfiLe RUn ~, 5" ~--2~ 8-.~-.8? F'rod. Profi[e Run ~, 5" 4-4 8-23-87 Perf. Record Run t, 5" ~5-~8 8-'2~-87 CH CNL.-ThermaL Run 3~, 5" 'I3-98 8-.23-87 CH CNl_-Epi~hermmL Run ~(.), 5" ~~3-98 8-23-87 CH DIL/SFL Run 3~, 5" Sch $ch Sch Sch Sch PLease sign an eceip't of data° Rosan~e Peek/ A"f'O-~~ . . ,~... , 'fRANS ~87437 , Approved ................................................ D I STR I BI..IT I ON · ,,-'"' C,=_ r, 't r a t 1:"' i i. e s ... I::' h i !. t i I::' s · '" £.'.h e v r o n F' B W e [ I. F i [ e s' D & ?4 F.: & I) · ~ E: x 'f e n.'4: i c, n E x p [ o r a t i o n.~ .. c, h i o ~: Exxon .~ State of ALaska Nob i [ ARCO Alaska, Inc. Post Office , 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Dante: November 7, 1985 Reference: ARCO CH Finals /~-2 --CET/ 5-26-85 Run 1 5" Sch ~/-15 CE t 5-26-85 1 5" Sch ~0'-6 --~Perf 7-4-85 1 5" Sch '~'3-6/~CET 5-23-85 1 5" Sch v~-7 - CET 5-23-85 ' 1 5" Sch 3 -16~Collar/Perf 7-7-85 2 5" Sch 19/-Perf record 7-5-85 1 5" Sch ./ J4-13~Perf~.;record 7-3-85 1 5" Sch *-/6-1-' CET 5-22-85 V~-9~ CET 5-10-85 V/6-15 ~'CET 5-27-85 ~11-1 i~CET 7-16-85 ~/~4-5z/CET 7-29-85 1 5" Sch 1 5" Sch 1 5" Sch 1 5" Sch 1 5" Sch Please sign as receipt of data. Received by Para Lambert A~ 1429C -A~e 0i~ & ~s Co~s. C0~mJssj0~ Trans 406 Chevron ' PhS 11 ip$ , D & M PM Well Files Expl. Services R & D Ext. Explora:ion. Sohio ~ Exxon, State of Alaska Marathon T~xa co · Mobil . ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 29, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 3-19 Dear Mr. Chatterton' Enclosed is a Sundry Notice for the subject well. We propose to pull tubing and repair the well. We expect to start this work on December 15, 1985. If you have any questions, please call me at 263-4944 or Eric Witten at 263-4968. Sincerely, Gruber Associate Engineer JG/tw GRU12/L44 Enclosure Oil & Gas Cons, Gommissior: ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL []XX OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P, 0. Box 100360, Anchorage, AK 99510-0:360 4. Location of Well Surface: 76' FSL, 397' FEL, Sec.10, T10N, R15E, UN 5. Elevation in feet (indicate KB, DF, etc.) RKB 62' I 6. Lease Designation and Serial No. ADL 28331 7. Permit No. 03-92 8. APl Number 50- f~29_2f~C~?l 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Change Plans [] Repairs Made [] Other [] Repair Well j~ Pull Tubing Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee20 AAC 25.105-170). ARCO Alaska, Inc., proposes to perform a workover to repair the subject well. follows: The procedure will be as 1. MIRU. Kill well. 2. ND tree. NU BOPE & test. 3. Pull tubing. 4. RIH with test pkr & isolate 9-5/8" casing leak. 5. Cut & pull casing. Install new 9-5/8" casing. 6. PU new SBR assembly and RIH w/tubing. 7. Test tubing and annulus. ND BOPE & NU tree. 8. Secure well & release rig. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. ?.l~y i ii."., "? 7. BOP equipment will be tested week]), and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within permafrost intervals. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated Start: December 15, 1985 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. (~ ~ ~ ~'f~2 Title Regional Drillinq Enqineer Signed · The space be for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Submit "Intentions" in Triplicate Form 10-403 GRU12/SN10 and "Subsequent Reports" in Duplicate R~.v_ 7-1 ,. ARCO Alaska, Inc. '. Prudhoe Bay ,-ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 283 4248 Donald F. Scheve Regional Operations Engineer July 31, 1985 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-19 Permit No. 83-92 Enclosed is the Subsequent Sundry Notice for work completed on the above-mentioned well. Very truly yours, D. F. Scheve DFS:JEB:pr Enclosures cc: SOHIO Alaska Petroleum Co. File Pi(DS 3-19)W4-3 ARCO Alaska, Inc. Is a Subsidiary of AtlanllcRIchfleldCompany STATE OF ALASKA ALASKA (31L AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-92 8. APl Number 50-029-20971 OTHER [] 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell (Surface) 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM (Producing Interval) 383' FNL, 139' FWL, Sec. 16, T10N, R15E, UM (Total Depth) 334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 62' RKB, Pad 26' I ADL 28331 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) X[~ Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 7-6-85. RU perforating unit and pressure tested equipment. RIH w/gun #1, shot interval 10894' - 10908' MD (6SPF). Shut-in well, POOH, all shots fired. RIH w/gun #2, shot select-fire interval 10840' - 10850' MD (6SPF); pulled up and shot select-fire interval 10820 - 10840' MD (6SPF). Shut in well, POOH, all shots fired. RIH w/ gun #3, shot select-fire interval 10872' - 10890' MD (6SPF); pulled up and shot select-fire interval 10855' - 10865' MD (6SPF). Shut-in well, POOH, lower 18' of gun did not fire. RIH w/gun #4, shot interval 10872' - 10890' MD (6SPF). Shut-in well, POOH, all shots fired. RIH w/gun #5, shot select-fire interval 10799' - 10809' MD (6SPF); pulled up and shot select-fire interval 107~79' - 10799' MD (6SPF). Shut-in well, POOH, all shots fired. Secured well, RD. Ref: BHCS 6-28-83 RECEIVED Alasks 0il & Gas Cons. Commission ~.qch0ra.n,e 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~¢.-'~~z~~'~ Title Regional Operations Engineer/~__Date--7/"~//~'--~-, . The space below for Commission use ,-~-~-~-- / ") '- -~ /-" rlC~/&/'-~ Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date __ Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Prudhoe Bay I~..~lineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer December 21, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 3-19 DS 3-21 DS 3-23 DS 3-25 Permit No. 83-92 Permit No. 83-112 Permit No. 83-127 Permit No. 83-145 Attached are Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/mjb Attachments CC: Sohio Alaska Petroleum Company File Pi(DS 3-19)W1-3 File PI(DS 3-21)W1-3 File PI(DS 3-23)W1-3 File Pi(DS 3-25)Wl-3 ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany "-" STATE OF ALASKA ALASKA O~L AND GAS CONSERVATION CO,v, MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 COMPLETED WELL OTHER [] 4. Location of Well (Surface) 76' FSL, 397' FEL, Sec 10, T10N, R15E, UM (Producing Interval) 383' FNL, 139' FWL, Sec 16, T10N, R15E, UM (Total Depth) 334' FNL, 315' FEL, Sec 16, T15N, R15E: UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 62' RKB: Pad 26' I A~T. 78331 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: 7. Permit No. 83-92 8. APl Number 50- 029-20971 9, Unit or Lease Name Prl]~h~ R~y Unit 10. Well Number D.q ~-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool (Submit in Triplicate) (Submit in Duplicate) Perforate [~] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate well 3-19 at selected intervals within the Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 500( psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10779 - 10809' MD (30') 10820 - 10850' MD (30') 10855 - 10865' MD (10') 10872 - 10890' MD (18') 10894 - 10908' MD (14') Ref: BHCS 6-29-83 REC£1VED Alaska Oil & Oas Cons. Commission Anchorage 14. i hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'.'~'~-~ ~ ~-/~' ~'(~ ~' The space below for Commission use Title Regional Engineer Date Conditions of Approval, if any: Approved by Form 10-403 Rev. 7-1 ~0 COMMISSIONER Approved Co~¥ p.~t rn" , the Commission Date7_~_¢~_~_ TT~,;~ .... Submit "lrftentj~Sns" infTriplicate and "Subsequent RelSorts" in Duplicate :: ARCO A La:::.'ka ~ '::' n Box i 00360 .Ancl'~o'.,"age, A La.ska:, 99.5t 0 :-,.. 5:: -. :::. , lie N C E A R C.: O C a .'-_:: e d i.-!.,.':.', L ,.'.:-:, F- i r., a i...'i: F;..' t.t 'n F;-'. 5.,,..,.., i" ,:-.'.:, 4' :-'.i i- i'i '[' J"., e a '1; 4,.. a c' h e (:J ,.':: o t::' Y a :i!: l" e C ,'/-;, J I::' .1: ,:..,...:,....,: ,,,. ocr 2 ~"~ :..~ v ,:::. .*~ r~..~. C 'r_'i: D A Y.' Alaska Oil & Gas Cons. Commission K ,.'-:.:, L i. '::/ H,.': F:' a 'r' 1. a n d Anchorage A 'f' '"'" t.., "i 42Pi::' '!" F;.: A N ,? '"' '''" o Chevron Hob i I. i) & i'4 H(::,bi I.~::.'"' & F:' [-"Xl:~t-orat'ion ,?ervice.-'~ Phi I_[ip.~ E x 4' e n s' i o n E: x p I. o r a t' i o n F:' '~" u. cl h ,'.:, e B a y W e I. I. Exxon F;..' & D (.; e t' 't y ,S' o h i o i"-iara't:hon State of ALa.ska ,, . ARCO Alaska, Inc. ---~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 1, Reference: 1984 ARCO Pressure Data 3-15-84 PBU/CDBR Otis 5-25-84 PBU/CDBR Camco 5-30-84 PBU/CDBR GO 5-25-84 PBU/CDBR Camco 6-29-84 PBU Camco 5-24/25-84 CDBR GO 6-16-84 Static Survey GO 6-15-84 Static Survey GO 6-14-84 Static Survey GO 6-14-84 Static Survey GO 6-30-84 PBU GO 7-2-84 PBU/CDBR GO 6-20-84 Static Survey Camco 6-20-84 Static Survey Camco 6-21-84 Static Survey Camco 5-19-84 CDBR 5-20-84 CDBR 6-22-84 PBU/CDBR Camco 6-28-84 Static Survey Camco CDBR CDBR CDBR CDBR -84 CDBR CDBR D.S. 1-4 ~- D.S. 1-25 D.S. 1-26_r- D.S. 3-19 D.S. 3-22r- D.S. 3-23 f D.S. 6-17-'~--~ ' D.S. 7-7A ~-- D. S. 7-13 D.S. 7-14 D.S. 7-16~ D.S. 7-16~-'~- D.S. 9-8~ D.S. 9-18/ _ ._ D.S. 12-16~- D.S. 12-17f D.S. 13-33-~ D.S. 14-8 D.S. 14-23 ;---5-16-84 D.S. 14-24~ 5-17-84 D.S. 14-25 5-18-84 D.S. 14-32~ 5-20-84 D.S. 14-33~- 4-29/30 D.S. 14-34 ~ 5-19-84 data. sign and return the attached copy as receipt of Kelly McFarland ATO-1429F Trans. ~290 DISTRIBUTION dhevron D&M Dr i 11 ing Exp. Services Ext. Exploration Exxon Ge tty Marathon Mobil 0il ~ ~'.:,s ',.. Mobil E & P Phillips Prudhoe Bay Well Files R& D Carolyn Smith Sohio State of Alaska ARCO Alaska, In Post Office Box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 August 1, 1984 Reference: ARCO Cased Hole Finals D.S. 3-6 ....... 6-10-84 Diff Temp D.S. 3-19---~ 5-25/26-84 Spinner Survey D.S. 3-22~ 6-29-84 D.a. 6-10f 7-4 -84 D.a. 7-3-- 7-6-84 D.a. 7-18~ 7-4/5-84 D.S. 7-24' 4-19-84 D.a. 9-18--- 6-21-84 D.a. 12-15-~ 4-13-84 Spinner Survey Temp Log Temp Survey Spinner Spinner Diff Temp Spinner D.S. 12-18- 4-14/16-84 Spinner D.S. 13-1/~ 6-17-84 D.a. 13-10'-~' 6-22-84 D.a. 13-12~- 6-18-84 D.a. 13-13-'-5-31-84 ~ -' D.S. 13-16J''~ 4-12-84 '-~'~ '-r-7-'"' ~ S 13-27 >/- 6-2-84 D.S. 13-28~ 6-3-84 D.S. 13-28~- 6-3-84 D.a. 13-28--- 7-8-84 D.a. 13-33~ 6-22-84 D.S. 13-33~ 6-23-84 D.S. 14-3'~x 6-30-84 D.S. 14-21- 7-7-84 D.S. 14-24/ 3-25-84 D.S. 14-34~'' 5-19-84 Diff Temp Temp Log Diff Temp CFa/Spinner Diff Temp CFa/Spinner CFa/Spinner Temp Survey Temp Log Diff Temp Spinner Log Diff Temp Caliper Log Caliper Log Spinner Log Run 1 5" Otis Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" GO Run 1 5" Camco Run 1 5" GO Run 1 5" Go Run 1 5" Camco Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 1 5" Camco Run 4 5" Camco Run 1 5" Camco D.~. 17-10/ 6-17-84 Diff Temp Run 1 5" Camco ~/~.lease sign and return copy as receipt the attached of data. Kelly McFar land ATO-1429F · Trans. 9301 Chevron D&M Drillin~ Exp. Services Ext. Exploration Exxon Getty Marathon Mob i 1 PhL11Lps ?rud~oe ~ay gelL FLles Caroty~ Sohio State of Alaska ARCO Alaska, Inc. Post Office B~-.~,,360 Anchorage,, ka 99510 Telephone 907 277 5637 ARCO Alaska, inc. ~- Post Office E ~ 360 Anchorage. Alaska 99510 Telephone 907 277 5637 May 17, 1984 Reference: ARCO Pressure Data D.S. 3-19f D.S. 3-22/ · 3/ D S. 3-2 D.S. 4-1j D.S. 6-4/ D.S. 6-7f D.S. 6-18 D.S. 6-23 D.S. 7-20 D. S~. 7-21 D.S. 7-22 D.S. 7-24 D.S. 7-25/ D.S. 7-26' D.S. 12-7A/ -D.S. 12-15" D.S. 12-18 D.S. 13-13 D.S. 13 15 D.S. 13-16 D. S 13 33 D.S. 18-7 / 4-9-84 Static Camco 4-9-84 Static Camco 4-9-84 Static Camco 3-17-84 Static Camco 1- 25- 84 PBU GO 1-25-84 Common Data Base Report 1-15- 84 PBU GO 1-15-84 Common Data Base Report 12-27-83 Horner Plots w/listing Sch 8-11-83 Horner Plots w/listing Sch 4-18-84 PBU Camco 4 - 29- 84 PBU DA 4=20-84 PBU Camco 4-20-84 Common Data Base Report 4-20-84 PBU r, Camco 4-21-84 Common Data Base Report 4-22-84 PBU Camco 4 - 28- 84 PBU DA 4-14-84 PBU Otis 4-14-84 Common Data Base Report 4 - 13- 84 ~BU Camco 4-13-84 Common Data Base Report 4-15-84 PBU Camco 4-16-84 Common Data Base Report 4-12-84 Static DA 4'i3-84 PBU DA 4-12-84 Pressure Draw-Down Camco 41-5-84 Static DA 3-14-84 PBU DA 3-14-84 Common Data Base Report ~ePle~$e sign and return the attached copy as receipt of data. Kelly McFarland 'ATO-1429F Trans. # 187 Have A Nice Day: D & M Mobil E & P Drilling Phillips Exp. Services Prudhoe Bay Well Ext. Exploration R & D Exxon Carolyn Smith Getty Sohio Marathon State of Alaska ARCO Alaska, Inc. Post Office 360 Anchorage, 99510 Telephone 907 277 5637 April 26, 1984 Reference: ARCO Cased Hole Finals / D.S. 1-25J 3-18-84 / PFC/GR DXS~. 3 [9 4-7-84 /~' Collar/Perf D.S. 3-22J 4-7-84/ Collar/Perf Log D.S. 3-23~-~'4-7-84z'~ Collar/Perf Log D.S. 5-9/~' 4-8-84,/ CFS/Temp Survey D.S. 7-16/ 3-10-84/ EPL D.S. 9-14/ 4-6-84/ Collar/Perf Log D.S. 9-17'~ 4-6-84~ · p.S. D.S D.S D.S D.S D.S D.S --'D. S -.D.S ~-.S D.S. 9-21/ 1-11'-84; 9-23,~ 3-8-84/ 9-25" 4-2-84 / 12-26-",2-19-84/ 12-27~3-6-84/ 12.-28/ 3-28-84" 12-28'"' 3-30-84 13-11 13-11 13-98 D S. 13-98 D S 13-98 D S 13-98 D S 13-98 D S 13-98 D S 13-98 Collar/Perf Log Collar/Perf Log ACBL/~DL/Signature/GR ,/~ ACBL/VDL/Signature/GR 'Epilog/Sandstone Analysis ACBL/VDLJSignature/GR ACBL/VDL/Signature/GR Run 1 ACBL/VDL/Signature/GR Run 1 Collar Log (used to cut tubing) Run 1 4-4-84~ 'Collar/Perf Log Run 1 4-4-84< Diff Temp Run 1 5-8-83 / Epilog/Carbon-Oxygen 5-pass overlay5" DA 3-16-84/ CPL/GST/DIL (3 runs) w/listing 5" Sch no date / Epilog/overlay avg..CO, SI/CA, SW 5" DA 11-12-83/ Epilog/~Carbon-Oxygen 6-pass overlay5" DA- no date~ Epilog~COmpare Induction Curves 5" DA 2-13-84" Epilog/Carbon-Oxygen 5-pass overlay5" DA 2-19-84~ GST Inelastic & Stations Run 3 5" DA Run ALL 5" GO Run 1 5" GO Run ALL 5" GO Run 3 5" GO Run 1 5" Sch Run 1 5" GO Run 1 5" GO Run 1 5" GO Run 1 5" DA : Run 1 5" DA 5" DA Run 1 5" DA 5" DA 5" DA 5" GO 5" GO 5" GO 5" Sch D S 13-98 D S 13-98 'D S 1-3-98 ~ 13-98 D.~/ 14-32' 4-1-84/ Collar/Perf Log Run 1 /~. 16-5-- 3-10-84/ Completion Record Run 2 V Please sign and return the attached copy as receipt of data. Have a Nice Day! 2-18-84 GST Capture</& Activiation Run 3 5" Sch 3-30-84/ CH D%L ~ Run 11 5" Sch 2-14-84z CH CNL Run 4 5" Shc 2-16-84/ CH DIL Run 10 5" Sch 5" GO 5" Sch Kelly McFarland ATO-1429F Chevron DISTRIBUTION Mob i 1 D&M Dallas Drilling Ext. Exploration Exxon Getty Trans. #171 Phillips Alaska Oil &~t~:~ Corls, Cor}]misoion Prudhoe Bay Well Pile~~ch°rc~° R&D Carolyn Smith Sohio Marathon State of Alaska ARCO Alaska, Inc Prudhoe Ba~ ~ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 24, 1984 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 3-19 Permit No. 83-92 DS 3-22 Permit No. 83-123 DS 3-23 Permit No. 83-127 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Enclosures cc: SOHIO Alaska Petroleum Co. File Pi(DS 3-19,22,23)W4-3 ARCO Alaska, Inc, Is a Subsidiary of AllantlcRIchfleldCompany STATE OF ALASKA - ' ALASK. )IL AND GAS CONSERVATION 'clMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well 1. Status of Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2, Name of Operator 7. Permit Number ARCO Alaska~ Inc. 83-92 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50-029-20971 4. Location of well at surface 9. Unit or Lease Name 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM DS 3-19 At Total Depth 1 1. Field and Pool 334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 62' RKB, Pad 26' ADL 28331 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ] 15. Water Depth, if offshore } 16. No. of Complet,ons 6/17/83 6/28/83 7/25/83I N/A feet MSL] 1 ~ ~IDe p; 2w~0elr SSSVset [ 21. Thickness of Permafrost 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ I-VD) 19. Directional Survey e h e 11260'MD, 9232'TVD ll210'MD, 9185'TVD YESi~ NO [] i feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL, Gyroscopic survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5~ H-40 Surf. 80' 30" Installed w/1990~ Pole~et 13-3/8" 72.05~ L-80 Surf. 2531' 17t~." Cmtd w/2300 sx CS III ~ 400 sx CS II 9-5/8" 47.0# L-80 Surf. 10649' 12~" Cmtd w/500 sx "G" cat 7" 32.0# S00-95 10369' 11257' 8~" Cmtd w/350 sx "G" cat 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10916-10936' MD 8912-8985' TVD 5½" lOa]7' 10~' 10974-10994' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. All shots with 3-1/8" gun, 4 spf DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED Ref: BHCS 6/29/83 N/A 27. PRODUCTION TEST Date First Production I Method of 'Operation (Flowing; gas lift, etc.) 4/7/84I Flowing Date of Test Hours Tested PRODUCTION FOR OIh-BBh GAS-MCF WATER-BBL CHOKE SIZE IGAS'OILRATIO 4/10/84 4"3 ' TEST PERIOD 645 499 16 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 1661 500 24-HOUR RATE J~ 3600 2787 89 24,4 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. . U/A " RECEIVED APR 2 ? 19 4 Alaska Oil & (;as Cons. Commission Anohnr~,,, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE _ . . . . NAME Include interval tested, pressure data, all fluids recovered and gravity, . . MEAS. DEPTH TRUE VERT..DEPTH GOR, an,,d time of each phase. - . Top Sadlerochit 10767 ' 8773' O/W Contact 13_110' 9093,' None ' . . BaSe Sadlerochit ~Not Reached 31. LiST OF ATTACHMENTS 32. I hereby certify'that the fOregOing is'true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is cOmpleted for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached-.sul~p. lemental records for this well should show the details' of any multiple stage cement- ing and the tpcat[oi~ octhe cementing tool. .. Item 27:Me~b0d 0,f':;'0b'~ration: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in~,.0._ther-explain. Item "T~ no cores tal~en, indicate "none". ARCO Alaska, Inc/ Prudhoe Bay =ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 25, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 3-19 DS 3-22 DS 3-23 Permit No. 83-92 Permit No. 83-123 Permit No. 83-127 Attached are Subsequent Sundry Notices for work performed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments CC: Sohio Petroleum File Pi(DS 3-19)W1-3 PI(DS 3-22)Wl-3 Pi(DS 3-23)W1-3 APR 2 7 l°JBa, Oil & G~s cons. commiSSion Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlantlcRIchfieldCompany STATE OF ALASKA -... ALASK, .¢IL AND GAS CONSERVATION C ¢IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7, Permit No. ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20971 OTHER [] 4. Location of Well 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 334' FNL, 315' FEL, Sec. 16~ T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 62' RKB, Pad 26' I ADL 28331 9. Unit or Lease Name Prudhoe Bay Unit 10. WellNumber DS 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly sta~e all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170), Began perforation operation on 4/?/84. RU perf un±t, pressure tested equipment. RIH w/gun #1, shot 10974-10994' MD, 4 spf (20'), flowed well, SI well, POH, all shots fired. RIH w/gun #2, shot 10916-10936' MD, 4 spf (20'), flowed well, SI well, POH, all shots fired. RD and secured well. Ref: BHCS 6/29/83. RECEIVED APR 2 7 1984 Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,~_ ~~ _~~ Title Regional Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc Prudhoe Bay E. ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer March 30, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 3-19 DS 3-22 DS 3-23 Permit No. 83-92 Permit No. 83-123 Permit No. 83-127 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments CC: Sohio Petroleum File Pi(DS 3-19)W1-3 PI(DS 3-22)W1-3 PI(DS 3-23)W1-3 RECEIVED Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany STATE OF ALASKA .__~ ALASK, )IL AND GAS CONSERVATION ( ¢IMISSION SUNDRY NOTICES AND REPORTS ON WELLS OTHER DRILLING WELL [] COMPLETED WELL 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UM 373' FNL, 139' FEL, Sec. 16, T10N, R15E, UM 334' FNL, 315' FEL, Sec. 16, T10N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 62' RKB, Pad 26' I 6. Lease Designation and Serial No. ADL 28331 7. Permit No. 83-92 8. APl Number 50- 029-20971 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Descri~ Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit Sand from the Prudhoe Bay Unit. Upon.perforating, the well will be flowed for cleanup. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: 10913-10937' MD (24') 10974-10994' MD (20') Ref: BHCS 6/29/83 Subsequent Work Reported on Form No./~ Dat,cl RECEIVED Alaska 0ii & Sas Cons. 60rnmissJ0rl Ap. chorago . 14. I hereby ¢,~.rtify that the f94egoin_g is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of APproval, if any: BI t0~l~i[ C. S~lil By Order of Approved by. COMMISSIONER the Commission Approved Date Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate · '" -'~ STATE OF ALASKA ALASKA _.IL AND GAS CONSERVATION C~ tMISSION WELL COMPLETION OR RECOMI LETION REI:I'ORT AND LOG 1. Status of Well REVI S I ON Classification of Service Well OIL7i~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2~ Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971 4. Location of well at surface 9. Unit or Lease Name 76' FSL, 397' FEL, Sec.10, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 373' FNL, 139' FEL, Sec.16, T10N, R15E, UM 3-19 At Total Depth 11. Field and Pool 334' FNL, 315' FEL, Sec.16, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 62' RKB, Pad 26'I ADL 28331 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. No-of Completions 06/17/83 06/28/83 07/25/83J N/A feet MS LI 1 17. Total Depth (MD+TVD) 18.PIugBackDepth(MD+TVD) 19. DirectionaISurvey I 20. Depth where SSSV set 21. Thickness of Permafrost l1260'MD,9232'TVD 11210'MD,9185'TVD YES IX] NO []'lNipple ¢ 2201 feet MD 1900' (APPR0X) 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL,Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED -20" 91.5# H-40 Surf 80' 30" I nstl d w/1990# Pol eset 13-3/8" 72.0# L-80 Surf 2531' 17-1/2" Ontd w/2300 sxs CS III + 400 sxs CS II 9-5/8" 47.0# L-80 Surf 10649' 12-1/4" Cmtd w/500 sxs "G" cmt + 300 sxs CS I 7" 32.0# S00-95 10,369' 11257' 8-1/2" Cmtd w/350 sxs "G" cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE 5-1/2" 10417' 10344' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL IMD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ 39°I 770 Flow Tubing Casing Pressure CALCULATED OIL:EEL GAS-MCF WATER-EEL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ . 27° 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/A . i' '.' I~ ;'~!:~ :~. Form 10-407 Submit in duplicate Rev. 7-1-80 DRN/WCl8 CONTINUED ON REVERSE SI DE .-. - . . . . ,-.~ - NAME Include interval-tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPI.H GOR, and, time of each phase. · O/W Contact 1111 O, 9093' Top Sad] erochit- 10767' 8773, : · ..... - NONE .. Base Sad]erochit ' Not Rea(bed _ . ... _ 31. LI'ST OF ATTACHMENTS Drilling History, Gyroscopic Survey (2 copies). 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,~' ~ TitleArea Dri] ling Engr' Date'O - Z',- 8''~ / ., INSTRUCTIONS General: This form is designed for sUbmitting a Complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference' (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and'24: If this well is completed for separate production~from more than one interval (multiple completion), so state in item 16, and in. item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". DS 3-,~. DRILLING HISTORY 'NU 20" diverter and flow line. Spudoed well @ ~600 hrs, 06/17/83. Drld 17-1/2" hole to 2545'. Ran 64 jts I3-3/8" 72#/ft, L-80 Butt csg w/FS @ 2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & ¢00 sx Coldset II cmt. ND 20" diverter system. NU BOPE & t$%d to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW - ok. Drld 12-1/4" hole to 10660' (06/26/82). Ran 274 its 9-5/8" 47~/f%, L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd csg ~o 3000 psi - ok. Drtd FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260' (06/28/82). Ran DZL/SP/BHCS/GR fr/11252 '-10595 '; FDC/CNL/GR/Cal fr/11256'-10595'; GR to'2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 sx Coldset [ cmt & 125 bbls AP. Ran 19 its 7" 32,~/ft, S00-95', Butt csg fr/10369'-1!257'. Cmtd 7,, lnr w/350 sx Class G cmt. Wash 9840'-10054'. Drld cmt to 11210' PBTD (07/01/82). Tstd lnr lap to 3000 psi - ok. Displaced well to 9.8 ppg NaCI. Ran CBL f/11210'-10280'. Ran 5-1/2" completion assy w/tail @ 10417' & pkr @ 10244'. Tstd ~Dg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well & released rig @ 0320 hrs, 07/03/83. ~-M/OH!9' sm 08/ ~.., ARCO Alaska, inc. ~ Post Office ,. 360 Anchorage. Alaska 99510 Teiephone 907 277 5637 October 17, 1983 Reference: Arco Directional Data (RE- DISTRIBUTION) The following surveys are being re-distributed due to poor copy quality of the first set distributed. Please replace previous copies with these. D.S. 3-19 7-8-83 Single Shot EW DoS. 3-20 7-18-83 Teleco EW D.S. 3-21 8-8-83 Single Shot EW D.S. 3-22 8-24-83 Single Shot EW D.S. 4-16 9-29-83 Teleco EW D.S. 14-31 8-22-83 Single Shot EW D.S. 14-32 8-24-83 Single Shot EW /~iease sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans. # 563 CheV~ on D & M Dallas Drilling Getty Marathon Mobil DISTRIBUTION .Alaska Oil & Gas Cons. Comrnismorl Anchorage Phillips E&D Caroline Smith ,~ STATE OF ALASKA .' -' '~' ~' ALASKA u,-L AND GAS CONSERVATION ~ ~VIlSSION ~____ WELL COMPLETION OR RECOMPLETION FiEPORT AND LOG _, 1. Status of Well Classification of Service Well oILX~] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20971 4. Location of well at surface LOC~.TiONSi 9. Unit or Lease Name 76' FSL, 397' FEL, Sec.10, T10N, R15E, UN VERiFiED I Prudhoe Bay Unit At Top Producing Interval Surf, E -}1 10. Well Number 373' FNL, 139' FEL, Sec.16, T10N, R15E, UM --~ ] 3-19 ~$V_~ ?z.-.J~ B.H. & At/otal Depth 11. Field and Pool ~ FNL, 315' FEL, Sec.16, T10N, R15E, UN Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Ba:y 0i ] Pool 62' RKB, Pad 26'IADL 28331 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. No. of Completions 06/17/83 06/28/83 07/25/83I N/A feet MS LI 1 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost 11260'HD,9232'TVD 11210'MD,9185'TVD YES~] NO [] ipp]e @ 2201 feet MD 1900' (APPROX) 22. Type Electric or Other Logs Run D IL/SP/BHCS/GR, FDC/CNL/GR/CAL,CBL,Gyros¢opic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 80' 30" I nstl d w/1990# Pol eset 13-3/8" 72.0# L-80 Surf 2531' 17-1/2" Cmtd w/2300 sxs CS Ill + 400 sxs CS II 9-5/8" 47.0# L-80 Surf 10649' 12-1/4" Cmtd w/500 sxs "G" cmt + 300 sxs CS I 7" 32.0# S00-95 10,369' 11257' 8-1/2" Cmtd w/350 sxs "G" cmt 24. Perforations open -to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE 5-1/2" 10417' 10344' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A - 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) N/A l DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD I~ 39° 770 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 27° 2~. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ()C~i' ';i. "-; ":..~ ' Form 10-407 Submit in duplicate Rev. 7-1-80 DRN/WC18 CONTINUED ON REVERSE SIDE NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR,and time of each phase. i O/W Contact 11110' 9093' Top Sad] erochi t 10767' 8773 ' NONE Base Sad]erochit Not Real bed 31. LIST OF ATTACHMENTS I her. eby certify that the foregoing is true an.d correct to the best of my knowledge 32Drilling History, Gyroscopic Survey (2) / /' / Area Drilling Engr. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should shoW the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". ~9 DS 3-= DRILLING HISTORY NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld 17-1/2" hole to 2545'. Ran 64 jts 13-3/8', 72#/ft, L-80 Butt csg w/FS @ 2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & 400 sx Coldset II cmt. ND 20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW - ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft, L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd csg to 3000 psi - ok. Drtd FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260' (06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal fr/11256'-10595'; GR to 2525'. Arctic.packed 9-5/8" x 13-3/8" annulus w/300 sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg fr/10369'-11257'. Cmtd 7" lnr w/350 sx Cl'ass G cmt. Wash 9840'-10054'. Drld cmt to 11210' PBTD (07/01/83). Tstd lnr lap to 3000 psi - ok. Displaced well to 9.8 ppg NaC1. Ran CBL f/11210'-10280'. Ran 5-1/2" completion assy w/tail @ 10417' & pkr @ 10344'. Tstd tbg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well & released rig @ 0330 hrs, 07/03/83. CSM/DH19' sm 08/1!/83 ARCO Al ~A'.F.:I.::]A, I NC:. DS 3, WELL NO: 19 :::IGMA-GYRO dOB NO: A0783RO:.34'F./PZ PRUDHOE BAY, NORTH SLOPE, ALASKA SIGMA/GMS 0.-112':10 MB, F-:URVEYOR: ,_IAHN, DATE RUN: 25-dULY-83 :'::IGMA GYRO: 6'27, PROBE: 067 I::'OI:~E'.E; I GFr'F: N:31 14.5E F:URVEY TAKEN FROM WELt_HEAD VERT]' ...Al .....:,F.:,_.TION F:ALCUI_ATED IN F'I..ANE OF PROPOSAL ' D I RECT I F~N: '-' 8?: BEG ':"-' . o _ . ~.:, MIN. W RECORD OF SURVEY RADIUS OF CURVATURE METHOD RUDHCIE BAY~ NOR'TH c,I....Uf-E, AI.ASI<A ,JOB NO: AO78:.-::RO:34'.'.-;PZ COMF'UTAT I ON '1' I ME DATE '/: ' 0 9 3:- O C T -.-:z: :3 1~"--'. (.) ::.. 0 F'AGE NO'. , , :/ TRUE EASI...IRIED I]RIF'T DRIFT COURSE VERTICAl_ VERTICAl_ SUBSEA R E C: T A N O U L.. A R C: L El S IJ R E [IOGL. E DEF'TI.-I AhlGL. E I]IIRECTION L. ENGTH DEF'TFi SECTIOhl ; TVD C 0 0 R D I N A T E S FiI'STAIqCE.' .DIRECTION '..3EVERI F E E T I) M B M F E E T F E E T F' E E T F E E T F E E T F:' E E T D M D G / 10 (:., 0. 0 0 (') 0 0. 0.00 0. F)O -62. C)0 ('). 0C) 0.0(') 0.0C) 0 0 ('). 0C:, t00 0 9 rE; 6, 59 El 1(')6) 100 00 -0 (')(') ':":' ¢)0 ¢) 1":' c. 0 ("-' ':' ='" n , . . (s ,, ....... )z. E (') 1:3 6 .', 2 ......... 00 (') 19 S :-": 1 .1. 1 W .1. 0 C) 2 (')0.0 (') (') 1:3 1 ._-,'":::-. C)(') C)..~_ 2_ ........ ':' 0.07 W 0 . =,z'-' :3. 0. 0. 0 20 ::,'" d, 7 42 W 100 . .:,'-' O' L)'. 00 0.6., 0 ~.'~""'o c,':" . 00 0 . '"c ............ o ,:. 0 50 W 1 (-') z"" .... c. '.-.' · 56, 47 4CDL).. ('D. .26 S86 '-"-',,~,:, W 1 (:)('D . 4(:)(') .0(') .1. .27 ._,':'._':::'":~,_. (')('). 1.04. S 1 . 1/.-, W 1 . S ..,,:~ W 0. 1/.'::, 500. 0 ]~':4 N 76. 27 W :1.00, 499.99 1.96 4:37.'-¢y'- 0.'~,9 S 1..:.6 W ? 10 ':'. 62 15 W lZi 600. 0 J. 7 S 87 48 W 100. 599.99 2.51 5:3'7.$~9 0.92 S 2.42 W 2.59 S 69 7 W 0. 12 700. 0 21 S 84 29 W 100. 69'~.'F/9 3.07 637.99 0.96 S 2.98 W 3.1:3 S 72 7 W 0.07 800. 0 16 S 53 58 W lC) 0. 799.99 3.59 737.99 1.15 S 3.48 W :3.67 S 71 42 W 0.18 'F;00. () 1:3 S 18 24 E 100. 899.99 3.75 837.99 1.53 S 3.60 W 3.91 '.E; 67 0 W 0.29 1000,, () 10 $ 6:3 0 E 100. '~:T~'F;.99 3.58 ~37,9'F; 1.77 $ 3.40 W 3.83 S 62:32 W 0. 15 1100. 0 6 S 26 2 W 100. 10':.:;'FY,, ~ 3,,53 1037.99 1,96 S 3.33 W :3.87 '.E; 5'.--.~ 2'.--; W 0.1'? 1 ::.?CPO. () 11 S 6 46, E 100. .1. 1 ~'.~;. '.'.'~.~ 3.60 11:37. '..Q'~ 2.20 S S:. :37 W 4.02 'S 56 54 W 0.1 .1. 130C). 0 15 S :32 29 E 100. 12S;9.?;9 3.39 1:237.9.9 2.45 S 3.13 W 3.97 S 51 58 W 0.2'7 1400. 0 7 S 29 42 E 100. 139'.-.-). 98 3.15 1337.98 2.62 S 2.87 W 3.88 S 47 38 W 0.20 150(D, 0 16 L:; '""=; . .:~,:, ,:. .......... · ..,._ 10 E 100. 14-.9'~ "'-' o..'Fy6 14.:37 'T;F: ';.' 86 S 2 65 W 3 '-7~('D S 42 4..5 W 0 17 " ="-' ~o ':' 7:3 S '~'. 44 W 3 7¢) S 41 1:3 W 0 2:::i: 16 (')0 (') 2 Iq 1 :_4 "'.":~ E 1 (')0 1 ~ 99 '? ::: 2 74 1 ...,.:, 7. "'-' .... . .. .,:.... .. # - . . · · - n .,- · J.,. m . · 17('JJ~).. (:J '?. N iff'-.",,_. .,...9/-.., E 100. 1/t,':'/':7_. . . ¢)o.. ,_, 2: ./',/'~_ 1637 . 1 ~2:J (_') (])(") 1/_:) N :'~ () 4 ~--'~ N 1 (.'.) (_')1 771'.~ '~1J"J 2 _1~_ ,~ ......... ,.. 17 3 7. '..-,' c. 2 '--.'":: :I.'-}¢D('D ("D 26 hi 38 1(] ...... E lC)0. 1F:'-)'~I '-)::: ":' 42 1837 ¢;::: .1. 76 ._, .: ..... w .:2 . . . i,, .... ,,' n · _ # d,...- · ....... :2 1937.97 '~'~ 2 S 4:3 S 5'7 1 W ('D 48 2000. ('))54 Iq 48 44 E .1. O('D. 1 o,T; 9 'F~ 7 1. ~ - rD.. 1. W 1.70 '"" 2100. 1 50 N 50 14 E 100. 20'?'?.94 -0.45 2C)37.94 0.63 N 0. :38 E 0.74 N 31 26 E ().'FY:2, 22CD0. 1:32 N 3/.:, 2'? E 100. 217'.-.?. 'PC) -2.70 '.71:37.90 2.7/_-, N 2.4(:) E :--:. 66 N 4(:) 58 E 0..5C.) :;;::300. 1 '.5:7 N 26 'F¢E 100. 22'?':5~. :37 -4.'.--.'?; 22:37.6:7 4.98 N 2:.75 E 6.2:3 N 36 F, 8 E 0.25 24CD0. 1 9 N 28 54 E 100. :2:379.84 -..5.57 23:~7.84 6.'F~9 N 4.79 E 8.48 N :34 27 E 0.:31 2500. 0 4:3 N :34:38 E 100. c.., 4'F;'.-). 8:3 - 6.,. 5:.--.:24. 37.83 8.37 N 5.65 E 10.10 N 34 1 E 0 · 44 2600. 0 30 N 50 .1. 9' E 100. :2599.82 -.7.38 2537.:32 '.-.-;. 15 N 6.37 E 11. 15 N 34 4'Fy E ().27 270(D. 0:35 :E; 84 5 W 10C.). 269S.~. 82 -7. 18 2637.82 9.81 N /_-,. 09 E 11.55 N :31 50 E 1 .(:)4 2800. :2' 52 N 71 11 W 100. 27'F¢'F~.73 -3.43 2737.73 10.24 N 2.26 E 10.4';9 N 12 28 E 3.3.% 2900. 7 '? N 7:3 I 1 W 100. 28'.--~'.-7¢. 25 5.31 2837.25 13. 18' N /_-,. 87 W 14.86 N 27 33 W :3.2'.:.. IRCO AI...A~::F'<A, I NC:. 'S 3, WE[_.[.. NO: 19 SIGMA-GYRO RUDHOE BAY, NORTH .=.L,JFE, AI_.ASKA JOB NO: A07:::.3RO:_::49PZ COMPUTAT I ON T I FIE DATE 12: 06: 09 O:=:-OCT-8:B TRUE ' '-'1 '- "1- '""' '-;I I~'-'~''''' . IEA.:,JRED DRIFT DRIF"r C.JUR.=,E VERTICAL VERTICAl .... :..n.=,~,-, R .E C T A N G LI L A R E: L 0 '.E; I.I R E DOGL. I!:. -- i-o i i-0 ' DEF'TH AIqGI....E DIRECTION LEIqG'¥H DEF'TH SECTIr"~N TVD C 0 0 R D I N A T E .=, DI:=;TANCE DIRE_.7 ION '..=.;EVER FEFT 0 M D M FEE'f' FEET FEET FEET FEET FEE]" D M DO/10(i' :3000. 10:3 ::3 N 88 24 W :B 100. 1.5 1 ,..,':' ".S 6:3 ':'...../-_, W :32()0. 17 5:3 S 68 8'W 33. ()0. 19 5.6 :E; /.,:'3 .:,'"1 W :3400. 24 25 'S 71 ~:.":' W :'::5¢)¢) --:,o 34 ':'" ......... ~. ...... 7 .... 16W 3/=,00. :]'::C) 19 S 75 :.T: W :3700. :32. 18 S 75 15 W :=::=:()C) .... "=' :34 ~' . .:,..., b 7/.:-, 1 W :}::900. :37 4.5 ':'._. 75F,_/-,.. W 100. 2998.04 100, :3095.4.6 1 C) 0 ,,:B ]. 91. ::29 1 ()0, 32:E:5, 89 .1. 00. :3:378. 47 1 ()0. 34/., 7.95 100. 3!555. (_')3 10 C). :B/.,40.46 1C)O. 3723.42 100. 3803.64 20. 1:3 :2:936. (34 42. :'-'2 30:=:3.46 /=:,9.4.:3 :3129.29 1()0 -12. '-"-'""'" '"':) · .=,.~. ~ .=,. ,2, ,. 1:37 :::9 '-"-' . .... :,o16 47 181.27 ::-:405.95 229.92 349:3.0:3 281.3:4 3578.46 336.65 .'3661.42 395.84 :2:741./..4 15./=,4 N 22.08 W 10.84 N 43.77 W 0.87 S 69.8(") W 12 ""=' -' 99 , ,:,.., '.:, , 'F.' 1 W 25.88 S 135.31 W ~'l ~ i · :'~,· c,.~"¢) c' 51.40 S 64.72 S 78.57 S 9:=: C) 4c. 27.06 N 54 41 W 45. C)9 N 76 "~... W 69.8C) S 89 17 W 0 0.7:3 ';=; ,=,.~:, 4,! N :3 '7.7'7 S 79 1(:) W 177.9'-7~. W 1 :::. 2.17 ':',., 77 4.,:."' W 225.50 W 2:31,28 S 77 10 W 275,72 .W 283.21 "._=; 7/=, 47 W 329, 7'..;' W 339.02 '.=; 7/=, 3/=, W 7'::,:;:7 70 W .... ._-,.-. ~,, 71 S 7/-', 30 N 4000. :39 44 S 76 12 W 4.100. 42 2C) S '76 4-:2 W 420C). 4:3:3:2 '.'":; 7'7 4 W 4 300. -1,:} :=:7 '.=; 77 10 W 44C)0. 4:3 26 S 76 47 W 1 O0. :388: :L. 63 100. :3957.06 100. 40:30.27 100. 4102.72 100. 4175.23 ~ 9 ...,8 9 6:3 4._7. 1 '"" 1 · 523 ,. 07 3895 ;, 06 590, 75' :3968, 27 659, 26 4040,72 727.70 4113.23 108.11 S 448.44 W 461.29 S 76 :;;'7 W 123.49 S 512.2/-, W 526.93 S 76 27 W 138.95 ,.E; 578.59 W 595.04 '.3 76 :::C) W 154.31 '.E; 645.78 W 663.96 '.E; 76 :':-:4 W 169.83 S 712.88 W' 732.83 :=: 76 36 W 4500. 4:3 36 S 76 45 W 4600. 4:2: 7 S 7'7 14 W 4.700. 42 :::3 :E; 77 7 W 4:300. 42:30 ,.E; 77 4 W 4900. 42 51 S 77 20 W 100. 4247.75 796.08 4185.75 100. 432(:). 45 864.31 4258 · 45 .1. 00. 439:2:. 79 931.90 4331.79 100. 4467.49 999.08 4405.49 100. 4541.01 1066.48 4479.01 185.61 S 779.89 W 801·67 S 7/=, :37 W 201.(:)6 S 846.78 W 87¢). 32 S 76 39 W 21/.,. I s._ S 913.08 W c~.. -=,._, o,_,.._,~-' 1 '.-]; 7/., 4. 1 W 2:31.25 S 978.96 W 1005.90 S 76 43 W ..4:,'-'/. 26 c.._, 1 ('). 4.'=;_, C) 6 W 1 ¢)_ 7:} .69 c.,.., 7/., 44 W 0.1'.; 0. 0.57, r, 500C). 4. 2 52 S 77 41 W 5100. 42 2':.) S 7:--: 54 W 52(:)(-). 4';:' :'~:=: '.3 79:36 W 5300. 43 4 :=; 8C) :=:/.. W 5400. 4:3 ].9 S 81 54 W 100. 4614. :31 11:34. 15 4552. :31 100. 4/.,87.83 1201.66 4625.8::: 100. 47/-,1.54 1269.06, 4699.54 100. 48:2:4.90 133/... 90 4772.90 100. 4907.81 1405.30 4845.81 260.98 S 1111.48 W 1141.71 S 76 47 W 274.73 S 1177.85 W 1209.47 S 7/., 52 W 2:37.34 ~E; 1244.24 W 1276.99 S 77 C) W 2$/9.(i)2 E; 1311.18 W 1344.85 S 7'7 9 W :3(])9.43 S 1378.83 W 141:}. 12 S 77 21 W 0, 2z 0.9: C). 4:i i-'1 [ C). o., 0. '.-.? :, 5500. 4::: 31 '.:.; :::2 41 W 5/=.00. 4:3 4C) S 8::: ](} W 5700. 4::: 42 '.--_; 83:35 W 58C) 0. 4.:3:3:3 S :3:3 5:3 W 590C). 4:3 2f:: '._:; 84. 12 W 100. 4980.45 1474.02 4918· 45 10C). 5052.87 .154',:'.. 96 499(3.87 100. 5125.19 1612.06 5063.19 100. 5197.53 1681.12 5135· 5:3 100. 5270.01 1750. C) l 5208.01 318./=.5 .S 1446.94 W 1481.61 S 77:35 W 327· 14 S 1515·36 W 1550.27 S 77 49 W 3:::5.12 c.._. 1584.¢).C). W 1619. .¢).6 S 7:::. 3 W 342.65 S .1 652.65 W 1687.79 S 78 17 W 349.81 S 1721.17 W 1756.'='._,5.- S 78 ._,':,1 W O. 5' C). 3] 0.2' O. 2: 0.2' · ~CO AL. ASEA, INC, ._.'=' 3., WELL NO: 19. '.::;I AMA-PiYRO_ _ · ~LIDI"tOE BAY., NORI'H SLOPE, AI_.AS:;KA dOB NO: A0783R0349PZ C 0 M P U T A'T I 0 N T I ME DATE 12: 06: 09 0:3--. 0 C T- :3 ::ii: PAGE NO'. EA'._::LIRIE I')]"~R I F'I" I:)R I FT DEPTH AI',IGI_.E DIRIEC'TION LENO'FH DEF'TH F'E E"F KI M 13 M F E E'[' F E E T TRUE C:OUR'..:;E VE:'RTICAL VE:RTICAL '.:.~;I...IB'.:_;EA R E C T A N G I..I L A R C L 0 S U R E DE, GL[. :3ECTIf/N TVD C 0 0 R D I N A T E :3 DI'.3TANCE DIRIiECTION SEVIER] FEET FEET FEEl' FEEl" D M DG/10( 6000. 4:3 ,54 S 84:36 W 61 ('). A.. 4 q. 12..,':' ,:,'-' :~...., ..,':' W 6200. 45 19 '.3 85 17 W 6300. 45:34 S ,: ..... o.:, W 64C}A 4/-, 17 ':' ':"q ~9 W ./:,5()c~. 4./:, 15 S 86 15 W 660(). 4'7 :3 S 86 '2'4 W 67()0. 47 11 S 87 7 W 6800. 47 3 S 87 4'7 W 6900,, 47 17 '.S 88 1 W 7000. 4'7 54 S 8'7 0 W '7100. 48 30 :E; 8'7 0 W 7200. 48 42 '.3 87 0 W 73 ('~.. A.. 48 54- ._,':' 87 (-~. W 7400. 48 48 ::; 87 0 W 00. 5:342. :32 1819. (37 52:3C) ,, :32 00. 5414.20 1888.57 5352.20 00. 5485. :::'0 1958. ','35 542:3.20 00. 5:']55.37 20:B0.16 5493.3'7 00. 5624. ',~3 21 () 1. '.:~4 5562. '?:3 356.55 S 1789.91 W 1825.0'7 S 78 44 W :.3.62.82 S 1859.15 W 1894.22 '.:i:, 78 57 W :368.7.5 S 1929.._.~"" 1 W 1964 . :24 '.'_-'; 79 11 W 374.44 .S 2000.:34 W 20,35.08 S 79 24 W :.379.75 S 2071.'.'38 W 2106.49 S 7'.-? 37 W 100. 5694.04 2174.09 5632.04 100. 57/:,2.69 2:246.72 5700 ,,/.:,9 1'00. 583(). 74 2319.87 576:-]:. 74 100. '.5898.78 2392.9'7 58:36.78 ,l 00. 59/:,6.77 '..:'4/:,6.07 :5:904.77 384.64 S 2144.06 W 2178.28 S 79 50 W ::: 8 q? :::A '.--; '-'"" ....... ~z. 1/-.. 63 W 22.~A ........ ._..:, :_:; :.:.!:C~ 2 W · ", ,- ", "], '%, 0 ~ W .:, .'.~..~, 44 '.3 79 W '-"-'"'"' . z..:, z.._', .':':5 '.3 f-::~'~ 1 .~:...C. '.' ..' , -- . '... :39/:,, 70 S 2363,00 W 2:396,07 S 80 28 W 399, :39 S 2436, 28 W 24/_-,'.-]:, :::0 '..--.; :::0. 41 W . .. 100 60:34 ':' --~ -.~e - .=,, o"7._-, ,-, · .-,: .- , .~ 1 ~. 5...9. 72 .- ~--,. .~ 1 402, 60 :--", ,:.., 10 .04 W 2 ~_ 42 . 1 .:: S 80 =._,.:,'''' W 100. 6100.86 2614.11 6038.86 406.50 S 2584.49 W 2616.2/:, S 81 4 W 100. 6167.00 2688.~T~8 6105.00 410.4:3 S 265~.40 W 2690.88 S 81 14 W 100. 6232.87 2764.07 6170.87 414.36 S 2734.54 W 2765.75 S 81 23 W 1 AO. /-,29A 67 2:R:::9 21 /-,2:~/-, 67 418 31:3 ~' '~'A . . . ~,:,.; 7:3 W 284~] 70 S 81 '3';' W 0. '5 ] 0.4.:: 1 ,, 1. 0.3:1 O, ) 2(' 0.8 ;I 0.54 0.5:1. ,~:. :: 0.9':;' 0./:,(: 0.2C. 0. '2('. 0. 1 (: '7500. 4-'.-? 0 S 87 30 W 7600. 49 0 S :38 0 W 77 ('). (). 4.9 1..'-' '._:; ,_,° c,,_, :::_ C)_ W 7 :E:00. 49 0 :--; 8:E: 0 W 7900. 4. 8 ?l_ 4 '.--; ,_,c:,..,° :-::_ ¢). W 100. 6364.4.1 2914.40 6302.41 100. 64:30.02 2989.65 6:368.02 100. /:,495.49 :3064.9/_-, 643:3.4'.-? 100. 6560.96 3140.28 6498. ?6 100. 6/:,7.~6.6:'_-: 3215.42 6564./:,3 421.92 S 2885.00 W 2915.6,9 S 81 41 W 424.88 S :...-...'9/:.0.41 W 2990.74 :3 81 50 W 427.19 '.3 :3035.'?/:, W :3065.87 S 81 .=_;'Fy W 429.50 S :3111.52 W 3141.02 '.3 82 8 W 4:31 F:(-~ 8 3186 F:9 W 3216 01 '-' 82 17 W . -- . , · - · ._1 0.4 :: O. 0.4 (:). 4:::: ):3'.'-. 800A. 49 0 S :38 0 W 81C)0. 49 2:4 L--; 87 0 W 8200. 49 30 S 87 0 W ::: .... F: (') C) . 4'.-? :::_ C)_ '._--; ,_,o/._. :::_ C) W 8400. 49:24 '._:; 86, :.7:0 W 100. /:,692.30 ' 329(.'). 56 66:30. :30 100. 6,757.6,5 33/:,6.0/:, 6695.65 100. 6822.65 :3441.89 6760.65 100. 6887.60 3517.80 6825.60 100. 6952.61 :359:3.67 6890.61 434.10 $ 3262.27 W :3291.0:3 S 82 25 W 4:37.40'.:: 3337 .9 (:) W :::_ 366 .4:3 S 8'.---! 3'~_':" W 441.38 S 3413.77 W 3442.19 S 82 3:3 W 445./_v.--y S 3489.6'? W 3518.04 S 82 43 W 450.33 S 3565.53 W 35':33.86 S 82 48 W 0. 0. 0.1 (: C). :~:::. 0. 1 (: :E:500. 4'? 30 S 86 0 W 8600. 4'.-? :3C) S 87 C) W 8700. 4. 9 1::: '.:_; 87 0 W 8800. 4.'? 12 '.3 86 3C) W 8900. 4.9 12 S :37 0 W 100. 7017.61 3669.56 6955.61 100. 7082.56 3745.48 7020.56 100. 7147.63 3821.26 7085.6:--: 10C). 7212.91 3896.88 7150.91 100. 7278.25 :3972.45 7216.25 455.30 S 3641.35 W 3669.70 S 82 52 W 459.94 :_--; 3717.2.5 W :3745.59 S :::2 57 W · .-,-7c;.-, 07 W 3821 3:3 '.--; ::::---: 2 W 46 3.9 2 S .:',..~ .:,. · 468.21 S 3868.70 W 3896.93 S 8:3 6 W -. 472.50 S 3944.27 W 3'.--772.4.7 S 83 10 W O. 3! 0.7,'.' O. 2( O. 3': C). 3:! RCO AL.A:2;KA, INC. S 222., WEL. L.. NO: 15) :E;IGMA-GYRO '-' I-I -' R U D H 0 E B A I/, N 0 R'¥ I.-I ,=, L ,. F E, A L.. A'.2; K A C:¢IMPUTATION pAGE NEi. _ . o.:,RO,:,4 ;YF' Z T I ME DATE ' , lOB NO: A(")7'- .....' '" '-" 12: 0/=, 09 - .-, -p _ c,..::, ' : 0._-,-U ... T ........ iE A'..=,;UREI.] DRIFT DRIFT DEF'TH ANGLE D I REC:'r ION LENGTH DEPTH F E E T D I'1 I) I't F E E"I' F' El E T TRUE COURC.;E VER'rlCAL VERTIC:AL SUBSEA R E C T A N G U L A R C: L 0 S IJ R E I)OGL['!! SECTION TVD C 0 0 R D I N A T E S DISTANCE D IREE:TION :.'-;EVER]; F-'EET FEET FEET FEET D VI DG / 10( 100. 734:3, 72 4047.88 7281.72 100. 7407..9'.P 4122.6:3 7347· .99 100. 74.77.8/=, 4 t 95.91 7415.8/=, 100. 7547.95 42/=,7,09 7485.95 100. 7/_-20.49 4335.75 7558.49 'F/500. 41 18 S 87 0 W 9/=.00. 3 9 0 S 87 0 W ?.'~700. :38 12 S 2227 0 W 9800. 236 30 S 88 0 W '.:.~900. :35 () N 89 0 W 100. 7694.92 4402,3:5 7632.92 1,00. '7771. :35 4466.70 7709. :35 100. 7849.50 4528.96 7787.50 100. 7928.99 458'2.47 78/",6. 10 0. 222~:~ 10.14 4 64 7.5 6 7 94 8.14 10000. :3:3 '- 4.z, N 87 0 W 10100. .:,'-"-'~ o. N o_,'"/- ¢;_ W 1 ('* 20 ..... ¢~. :,] C) 4-'.2 N ,=,'-'._, = 0 W 100. '-" '- '-' ,=,0 .-.L,=. 6,9 4703.38 ,_ vo., ,~'"'"P. 68 ~ 1 '-'114 66 100 ,~176 66 47~,6 o 1 O0. 8262.06 4807.o'~ o~,.'~ ~'")'",.,. 06 476.46 .., ¢' 4019 .76 W 4047. '? 0 S '=~,....,'--' 14 W 4.:=:(') '-"-' . ._,._ W 41 .... ' 6..3 '.=; '"'-' 1 '~ .... =,c:, '.E; 4. 094 '= ~ ~ ~. ,=,.=, W 484 '"'-' '-' . .... . ~ ~ .=, 4167.88 W 419 ~9 91 S o.'-'""~ ~ '~' =":' W 4237.'~¢6 S 423'2.10 W 4267.0'2 S 83 26 W 4'20.96 S 4307.87 W 4335.75 S 8:3:30 W 1.0('. 1.5(; 2.0C *2'. 12 4923. ,=,~'v. o._, 4374 · 5'F7 W 4402. :38 S 8:3:34: W 497 '-'= '-"-' · ,::,.:, . ..' ._, '.=; 44..:,c,. 97 W 44.66 74 S '-'"" :37 W 50¢~. 51 S 4~¢~1 .27 W 4R29. ~')'2 c,~' ,_,.-,'="=' .:,~""- W 5023.16 S 4~A1.88 W *~,-,,:~ ~i~ c. 8:3 42 W ~ ) ~¢)~:. 67 c- 4620...::C W 4647 67 '.::, o.:,'="-' 47 W 5¢~1 70 "' 4676 72 W 4702--:. 55 .. . .: .... :2; :2::2: W 4~,'"' '"'" '=-' 4 7 3 0 · . C,. ~,'-' ,., . . ._, ,--,.-, W 4,=,t ,.., ~3 :2;84 W 494. :30 ._,c' 47 o..'. 76 W '-' '~ ''-~ . ,-'*', 1./=,:iii: 1.8:7 1 ,, 4.(;::' :L0:-':00. 2:22 48 N 82'-: 0 W 10400. 27 0 N 22:0:30 W :L0500. 25 42 N 78 0 W 10600. 223 0 N 76 0 W 10700. 21 230 N 75 0 W 10800. 20 46' N 76 0 W 10'700. 20 4,2 N 77 0 W 100. 8526.86 4942--:. 86 84/=,4.86 100. 8617.95 4982.6'2 8555. '25 100. 8710.50 5018.01 ,'-_-:648.50 100. 880:3.77 5051.6'7 8741. '7'7 100. :-} :.=.: 'F. y7.2:3 5084.94 88235.28 474.12 S 4922.01 W 4944.7'.P S 84 :::('~ W 4-6 4.8!5 S 4'2 6 2. 1:3 .W 4 9:2223. 'Fy 0:2; 8 4:39 W 455.37 S 499:2:.:2:23 W 5017.523 '.:!; ::::4. 48 W 446.34 S 5033.76 W 5053.51 S :2:4 5/=, W · ,~ )/-,,-,. 22 W~ 0 o 7 12 S :::: ~ 4:38 (-~/-, S '=" '-' 4 W 1.71 2.82;;! 1.5~f ('). 7 5: } :3 } 1100C). 21 122 N 77 0 W 11100. 22 1222 N 7:-]: C) W 11150. 222 1'2 N 72E: :.-.20 W 1 ()0. 8'.'.-"':-.Y(:)./=,7 51 1:3./=.2 :::'F'28.67 100 9r):::3 ~.~ 5153 /=,3 o¢).':, 1 ~ · . . -- · '--'.. m .' . -' · ._._ 5 C). 9 t 2 9.83 '-5171./_-.0 '?C) 67.8 3 4230.02 S ~I023.06 W ~1'21. 15 :2; :i35 11 W 4- 22:. 00 S 512229.2 4 W 515/=.. 523 ..2; 2225 :!, 8 W 41:2:. 14:3 515 7.7 7 W 517 4.6'? ,.s; :35 2 :;,:-: W 0.5(; 1. 1,'~ 0.4.5 :'RO._IECTED TO F'BTD :'RJ3,JECTED TO TD F 11'4 AL CL O:SURE -- D I RE C T I OIq: El I STAFIIS E": S,:,'-',_, '= D E r'~::; 29 M I N ::2; :31 S E F'. S W 5:214.6:3 F E E ]" ARC(] AI_ASKA, INE:. D'..",-;; 3., W I:":: L L N 0. 1 '."} '..:.'; I G M A -G Y R 0 , I0 B N ,-~: A ~..) 7 ,.-., ..:, R (..)..:, 4..~ F/. PRLIDHOE: BAY., I',IORTH SL...OI::'E, AL.A'.=;KA '.iii;IGMA/GMS 0-.1:[210 MIl, SURVEYOR: ,..IAHN, DA-f'E RUN: 25-,_IULY-83 S I ~:4MA r-.~YRO -' 6 ....-. ?., F RU£ I::.. 067 I:::'ORES I GHT = 1',!3 ! 14.5E SLII:~:VIZ¥ 'TAI<EI~I I='ROM WELLHEAD REE:ORD OF INTERPOLATED SURVEY ?~..']:O AI_A.::,I':..(~-, I r,.IC. ~.: 3: W E I_ L~. N ('.) .'. 1 ,.:7; '.=: I G Id~.-G Y R O · ~I...IDI-IF'tE." BAY., NORTH '.=:LF~PE.., AL_ASKA ...I0 B N 0: ~ 0 7 8:3R('):34. 9P Z "f=i .... F' ~ ,.: E NO ] ..................... M AR K E R .................... 'F RI_IE SI._IB'.::.;E ~ ...................... C:ODE ................. MEASLIR[=D VliERTIC:AI_ MD-TVD VI.:.:'RTICAL R E C: T A N G LI L. A R C L. 0 S I.J R E VERTIC:AL ........................... NAMIF ...................... DEF'TH DEF'TH DII=F DEF'TH C: 0 0 R D I N A T E S DISTANCE DIRECTION THIE:I<NES:.:.'i: F'- E E'f' I::' F'. E 'T' F E E T F' E E T F' E E "r F: E E"r D M r 0 P :i:'; ~G I:;: I V E.:. R I" 0 F:' .'.:i; H U ]:31_. I I< F 0 F' S A D L E R 0 C H I '1' I' CI P Z 0 NE .ii: 41Er'r '1"0 F' Z 0 N E,,:'"' 3 / W r-: 0 Iq'l' A i,-..:"l- 1 C) 6 5.4:,. 0 C) 8 6 6 9.7 :F: ! ? :3 6.2 8 6 0'7 ,, 7 8 1 () L-.:=39. C) C) 87 C) C). :'.ii: 2 .1, '.-} 8 8.7 8 L, 3 8 ,, :32 10'76'7. C) 0 8'7'72.9 9 1 'i..') 9 4. C) 8'7 ;t 0.9 9 10968.00 8960.79 2007.2 8898.79 i 10:2:0 ,, C) 0 '? () 18.5:3 :.~ 011.5 8956.53 I 10 :E: 4. C) 0 9 C.) 2:2 . ..-'-' ='...,, 2 C) 1 1 · 8 :=: 9 6 0. .,.9 5._ i 1.110. C) 0 9(') 9':' '::' . ....... .... :_. ,.., 1 2 C) 17 ,, 2 ':.)(3:::("). :::~ 1 4 5 9...4':i ._,':' 4. 9 82' .71 W 4.=~/' 4.1 '.B 4 994- ':'0 449. :32 'S 5022.24 Id 432.59 S .=~C)91. '.-':~ 1 W 42'7.61 S 5113.91 W 42'7 '-.""=¢ '" "'- o6 W ..... :, 51 1 ,-,. '-' 4 21.23 ._,':' .=i.. 14,..-. 9 4 W i.::. - # .'"'1 i'"1 I'"' ,.J (..) (.) ..:, . ,:,,_, S ,:,4 4 4. W · .5C) 1 5.61. '.=; 84 4. 7 W 5042. :2:C) :=; :F: 4 5:3 W ": ...... ~) W .... ,110. '"'"' ::, ::: 5 ,.._1 .. . 51:31.7/=, S 85 :l:3 W ALASKA. WELL ND A- C.,., Y ~ i.l] VERTICALI PR JF_CTI[OII E~O, ~LE I :Ill. - ~000 fEEl' . . f DR I , ........ ..... : RECORD fl:O AL A'.:i;I<A, I I',IF:. ." .'" . . :. :,. · RUDFIf)E BAV, Nf]F<TH SLFJF'E ~R,t=E<: ............................................................ :: .................................. = ...................................... ;7: E:ASURED DRIFT DRIFT I-:FIIIRF:;E VERTI_,AL VERTIF:AL SI.~I.P,'.E;EA R E E: T A N .[~'..I.I L. A R C L 0 .c I_1 R E ~ - ," ,, D (] r,l LiEF'TH AFIGL. IE DIRECTION I_ENGTH E.EF.¥H SEC:TION TVD.' C 0 n R D I N"'.:..~'.' T E S DISTANC:E IREC:TI SE:VE.F: FEET D ...... H D F:EET .................. FEET. ..................... · . .. ,.. ; , ,. ' ¢3 O O () (] '; ... '(3 0(') O C)O -/-,? ;. C)O O. 00 ,:.,O. ¢"~("~ · -' "" 1 .I. W 2/=,'.-.-,7 I .1. 5 F-; /-,/-, W I Pi'2 ,2/-,9/- .; '-.-*¢* I ....:-, , -- -- .... · -- .. -J .... , . · -.. .~. # .. · =, ,.;,.o I':9'. '=' <' "" ~' o.::, . i I Pi S "i, 7 "; ':'" "':"="='0 4 F;O N 75 W 12 ..... 7 63 ..:.7._,7 ,_,,.- . ' ,., W · -,/-,.,...., ":' 1 (") 74 W ..... ~ ._., .. (387 :.3 ;; ' :37 (') :'.-.'; "75' H 4.(")58. 41 15 S '76 W 46.4:2. 4:':: ("~ '.:i; 7 5 W 5168, 4,3 0 S 79 W . _ ='i '-.'/. F'; 6'P 4 44. (') '.B ,:, 4 W .... ~. :,. ./.-,255, 4.5 4.5 S :36 14 561, ,f::,75C). 4'7 :=:0 :.:!; 8,/:. W 4".-';'5,. 72'.P ("). 49 0 :--: 86 14 ..540. '7807; 49 (') N 90 · N ..... 5 .1. 7 ~ .... ¢':. ':"."a ~- .- · '.m' , · "', ".,:i'..'..:,.;Y,.¢ i- 0"') ', !'1~ ~ , , .,~,cI _ , , .. ~ .,,,~ ,, ~f ; ~ ,-I~ ..~ ,';; *~;t , ,,-~.-i~. "ri ;'~; ,, .,,, ,:,¢~ . . , . ; ., . Fi; '~,~'-. 1.;._,. 29 ~/-,09 o-> ~ ~ ,~ ~ ~¢ . .. . . ,~ o/...h,;. 77 2:364 ,' ¢~/-, · ._ *_* ..J .~, ~ .~ ~ . - - 62.22 ;' :33 :2767.30 , ~ .] ". ;:¢'=""' ' ~ :3576 04 6; .~'Z~.-.~ -.J ~ - 727 ! ~',71 :3975, 2. 6 7527.40 4:247, 90 7;?..17"L._,c' c,.... 4 .... :. 7 . 9. o.. 8:3,p 4 ~ 4 9 4 8'P 0, 2 6 ... '. .:.' . . · :qA30:~ c":',_.._,499'~ , N:/-,_ _ 'P 181'~ 06 ~22':~, 87 8:36, 5. 4.'? :3 0 N ? 0 W 5!58. "'"-"-' ~ 49 (') E; A':,, W Pi:'~ ,::, ,=, .'.-....m ~, .... . · _ .... '.:.')2'70. 4.5 ('-) N 90 W :3'75. 9789. :37 30 S 89 W 517. .1.0620. :2:4. () I',1 7:3 W 2/-:.:'-':,, .1. 1.220~ 2:3 () N 80 W 60()~ "' R' 0 ,...I E r:: ]' E D 1;126(':). :;!::3 0 N 80 W .4. C). .. F: I I',IAI._. CI_.OSI_IRE .... L) I F;.'.I!=_' C'T I Cml: l-I ]' ':::; "1" A N F' F' '.' ,. ';::942,_,':":',_, :'1 . 20. N :':: 0/-.:.-.4 ~:' ?;/., /., ,. ,:, ........ ,,.. :1. '.E; '=' 1 F,/-,; 4:3 .1. q 50 o ._. _ _ .,. i~ -..' '=' ":'/- ':' ": :R':¢ ' ':' ~ ':~ '= .... · .._.,_,. .... _ ._.._..".._, S ...... ' 48 · ., · "=":'. 36 W "1.~1,"). :=I'=' W i.I ,"%. I ~ ,.-..- ~ ...... !'.2;.-_.'.:24 14 ,.~ ,;. ,:=, # . .... ... · . ~ ,rr .?.:~.1,4:..?..,:.~,,.~,~ 7..-, .S4.._, ,544. :..-.':4 W ~ "~ ',';' " "" :A ';:,,~:/. ;'S ' ,p.:, ' 1 :::'=././', l.-, '.:; ~i:.49Cl ':'0 W ._.1 -"-'" · '-~ ,.~· ....... ~',, - I! ' ~ '," '-' ' ilh~ ,.~ .,,,~ ~,~4 ),,,., ,' ~.~ .... ",'" "- , , ' "~ ~,~i'',~ ,'%'7¢ ',~$ ~' ~ ,' ~j ~0. ()Fl ~.: · , ,,,~- ,. .~ :_ ',: ,~_ '. .~. . . ...¢/ ... 5(.'.)/_-.3, .;:_'9' 5460; 8:3 5800., 77 ./...-, 160. :3:3 64'?'.;', 52 , . . 92 i 7.;, :_=:8 · · _ .. 5 2: :2::3, :=:.=.5 /-:, :~:/_',:3 ': 75 72C)9, 71 74/:,5:~'40 ~,-., r..- ~ . 7,=,._,._,:, :2::':: ,-.,.-,.-.,.-. · ,3..=/ ,_-,..~ .~ ..'., .. ., E: 54:. 8.8:2: '.:.) 11 '? .: 06 ., ' . ' S :iii: '= DEF.~S 48 I'11 I'.IS ":'i".;' 4 ":~ ' ~!.~ ":: I:::' F= F:' 'F .'2_-:'71 '::'/' :'_-.'; 1'~'7'7 48 W .. :35 :L:; 1'77.1.,76 W 4. C.) 6 ,. 4.:31,4.:% '..:.!: '-"~"'~- _ .-:..=.,:.(.)./-,'7 W 459.=:= 27:~ ..., .... w ...... , '.~; .: ~2. "-' '-- .. 478,-.1.7 S :3i22, 41 W .,. ,., 473. t 7 S :3.54.5..1.:3 W 47/_-,./.-..7 .S :39'Z~/=../.:.2 W 47'?. 0'7:3 .62.'.t'o, 81 W 4E:2,05 S .I..:,6..-.. 7..5., W 4,1:2..'. 07 :--; 4 .-..,:, 1 · · '"'= - ~-'-" 4 W :386 ~ .~ ....:~ .... ,:-.1. , . ,.' :.'. , :38:3,54 S 52:29,. 4-9 W : O. c)() (') C) (). OC) 0 () 1.6/.:. :3 6,/.::,(') W , 7. /-,.. '='..., :E; ,..,'::' .1. 2: .1. Id 17.4.9 1'4:3 '7:2 6 W '="=',3:3 N :37 '"' W ........ :, 7 Zl,. ./-,0, '77 '::' '='":' 87.49 S 77 7 Id :3. 1 2'7.4':F.: S '7:3:2:'7 Id 2', 16,,'.:5,. :3,'.5 S '7 2 5 4. W ' E, ,, 2!55,01 S 7:3 1'7 W '""'= '=' _ '=:' %" 4 ..::,.,%,/-,0 ._.,7 .... 3 W · 51 (). ';?. 7 S '74. '7 W 90.1..91 S 74. 4.:}) W .1. ;7'6,(:)~ ::.4'7 :::4"':- .,:.:,: W 16,2:0.'71 S 76, zt4 W '2 c) 1:7:. 19 :F: 7"=' '"' ....... : .... :. 1W 2 :]-;70. ;7."7 S '79:31 W 2:: 7-/0.9:2 S 80:2'.'7 Id ;-=:1='-, . ,_,o. (')6 :.:.; 81 5:.':3 id :3.5'76.. 5'7 :5; :5:2 2 4 W ;3975 :=:~"~ '.=; '-"=' 7 W ~ _ . ,:),_' . 4;247.91. S :3:3:31. W ~... ,~ ¢% ..... 4..:,,:,,:,. 14 :=; E::]:: F';:::: Id 4891.2:'; S :34:32 t4 ._.,.,::.4..",. F';.. ,_., ._% ()., ("). 0, 0 .. O. (). (]). 1. ,, , . ], ,, ('.). ('). 7.::,[iRIE'T C:HART"S RELA'I"E[~ DA'f'A FILE · ,., .. '.. URVEY FIL. E NI..IMBEF~ .1.76:3 .' - . · · · BOTTOM HOLE: ASSEMBLY VALI..II:':i:'.:; I_ISF-D FEiR.".]BEPTH ARE MIl ,.. DEF"I'H . . 2545.00 414. ?. 00 '7,9 ? ~:":. 00 8971.00 10660.0('~ DAY 1 2 4 6 7 8 .1. ~'~ 1:2 1- I-4 ':' ' ~,'¢'"" }:' '""" .... ' ~' ~ .... ~ ~i'¢" ' ~I~ ...... ',~', ~',7% ,' ~ ,~,~'*,'!~B ' """ ,.,:,~ ~:~ ,.,,,~;~; ,. ,., , ,~., .... , ..; , ,. ~,~:,,,, ~,~ ,, ,[~ : . .~ ........ ,,, ~ ' ,2; . ,' . ~, · . , .; ' · . , ~ .... . ..,., · .~ . .,,' ., . . . , DR Z L.I. ~ NG D~YS "~"'::'":":'"'"'"" ., WI_LIES LISED FQR'.DBPTH ~RE ND ... ' ..... .',,. ............................... ~.L _~t'_ ...... : ......................... . ..................... T.:: ........ ' DEF'TH 25 4 %. ~]~ 0 .,::._.,'-~.._, · O C) 3126. ("~c~ 4640.0 6445.00 78 ? 8 · 00 E'.'? 71 . 00 .-- ........ .,. O (') 0660 - 00 0660.00 0'? 20.00 J. 26 (]), 0 () WE I GHT ON BI"I'" " ,: ,'..: W E't' 6 H T--}~--~ G .t-V .F.~.N:-.' F'E R J ":~¢;~"~ "' F' ¢'11. IN D ¢4 : ........ ;..,..: ......... .- ,.:: · , VALI..IES I I.'::;I.::T.D F'CiR',',D~I::'TH ARE MIl . ' .':':. ~ .... . .;.. ;,,,~ ......... ~. ..................................... ~ ~-: ...... ~ .; , . .. DEF'TH WE I GH'I- ': .... ... .. ' · ,., 1 :.?.: 25.0(-~ 6, 5.00 " · --i ~ [- ., : · *" ,::..', 4..', (:) (") /", (') () () :"' ': : · - # # . - . # . . ':.' ~. · ,':. '-"- 00 ~,~.. 0(} '::: : %.....L ~, . :l 0660. ()C) 4. 0.0 () "',., '" ' , ,' . ..' -, 112/_-, 0.0 () .50.0,.':) ." ! . , : ' ., · . . ,.. . ."('"':'"": . !.' : · ! . ' ,,.." REVC'I_UT I C'~ ].: ~'ER' ."MI N.O.1"E ~" "" .',' '" ' " ~, . , · ~,~,;,:,,,, ' ,' ~'; ....... ~ ..... ' ,~t~,z ' ' · US~'".?,.'~.UR.....'DE'",,~'.I'..~'bu ~ hi,!,~ ~. ' *"'~'"'-' '"~: .... ,:~. ,.. ...... ~..,,~,:, ~,,,. . .... ,~ ,'&"",, ,: .,~ ~"~;':~..~ ,,.,'!":~.,,."':'~ ... .: " t~/~:]/~:, ;F: .<'::;? ? ~:~ ."~,.~ ¢:m ~:.:',', '?% .,~'~ ,U ~*?:" ,6>'i;?, ~'.:.i'i;iii' ' :S:;i?,'../i;'~ .. ,;. ' ' i~ ~ '" ''''~'' r~ ~.,% ' ~., '. ",,,. ~ *",' ':' r~ DEPTH R. 1 :-.4.',':'%. 0 0 ' 150 .. 00 2_'545.0 0 70. 0 (:) 414. 9.00 120.00 4?4'7.00 120~ O0 ........................ 7.?.--.~:_::. (')0 140.00 8'? 71.00 1:30.00 10660.00 120.00 11260, 00 .1. 2(), 0o Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. '' Operator, Well Na~ and Number Reports and Materials to be received by:~ --'~ ~~--~-~'~ Date ReqUired Date Received Remarks , Ccmp letio n Report Yes /~. _ / ~._~ / ~ / ~_~ Wel 1 History Y _Samples Mud Log ~ .... Core Description , ( Registered Survey Plat Inclination Survey · 'l'DirectiOnal Survey PrOduction Test .Re~orts · · , ,_ , , Digitized Data , .. , ARCO Alaska, Inc. Post Office Bc ,60 Anchorage, Alaska 99510 Teiemho~'e 907 ,_'277 ~537 September 9, 1983 Reference: Arco Directional Data D.S. 3-19 ~-~ 7-8-83 D.S. 3-20'''~ 7-18-83 D.S. 3-21~- 8-8-83 D.S. 3-22J 8-24-83 D.S. 14-24-- 7-8-83 6-17-83 D.S. 14-25'~ 7-18-83 D.S. 14-31~j 8-22-83 D.S. 14-32-' 8-24-83 Single Shot Teleco Single Shot Single Shot Single Shot -Magnetic Survey Single Shot Single Shot Single Shot EW EW EW EW EW Teleco EW EW EW Please sign and return the attached copy as receipt of data. _ - Kelly McFarland ATO-1429F Trans. # 510 Chevron D & M Dallas Drilling ·Exxon Getty Marathon Mobii DISTP.!BUTION~ North Geology Phillips Caroling Smith Sohio Alaska Oil & GaS COILS. Anchorage State of Alaska E ARCO Alaska, Inc./--,. Post Office 360 Anchorage, Alaska 99510 Teiecho~e 907 ?77 5L337 August 29, 1983 Reference: Arco Cased Hole Finals D.S. 3-19 ~'' 7-2-83 CBL/VD D.S. 4-8 / 6-22-83 EPL D.S. 5-17 ¢ 6-24-83 EPL D.~S. 6-9 /~ 3-3-83 Epilog D.S. 12-12 ~/~ 6-24-83 CET 7-23-83 CCL & Perforating Record 7-21-83 Completion Record D.S. 13-3j 3-13-83 Epilog ? D.S. 13-7¢ 3-12-83 Epilog D.S. 14-5/ 8-22-80 Epilog D.S. 14-7/ 1-12-81 Epilog 3-9-83 Epilog D.S. 14-9B'JJ~ 3-11-83 Epilog D.S. 14-24/ 6-30-83 CBL/VD D.S. 14-26'~/ 2-27-83 Epilog D.S. 16-11~/ 7-30-83 Spinner Log Run 1 5" Sch Run 2 5" Sch Run 1 5" Sch Run 2 5" DA Run 1 5" Sch Run 1 5" Sch Run 1 5" Sch Run 1 5" DA' Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 2 5" DA Run 1 5" DA Run 1 5" Sch Run 1 5" DA 5" Camco /~//P1/e~se sign and return the attached copy as receipt of data. Ke 1 ly McFar land ATO-1429F Trans. # 492 Chevron D & M Dallas Drilling Exxon Getty Marathon Mobii DISTRIBUTION North Geology Phillips Prudhoe Bay sohio ARCO Alaska, Inc Post Office u .:~ 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 August 11, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Monthly Report of Drilling & Workover Operations Dear Mr. Chatterton' Enclosed are Monthly Reports of Drilling and Workover Operations for the fol lowing' DS 14-25 DS 14-31 ~S: 3.-19 DS 3-20 DD 3-21 Pingut State #1 South Point State #1 Also enclosed is a revised Well Completion or Recompletion Report and Log for DS 1-25. The report previously submitted inadvertently incl. uded perforations which had been squeezed under Item #24. SinCerely, M. A. Major Area Drilling Engineer MAM/CSM41' tw Enclosures ARCO Alaskm. Inc. is a Subsidiary of AtlanlicRichfieldCompany , 'i' ? ~ STATE OF ALASKA ...... /'~,// ,. '-- ~-- ~,'~ ALASK. )IL AND GAS CONSERVATION ( '.VIMISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIO 1. Drilling well J~ Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 50- 029-20971 9. Unit or Lease Name Prudhoe Bay Unit 4. Location of Well atsurface 76' FSL, 397' FEL, Sec. 10, T10N, R15E, UN 5. Elevation in feet (indicate KB, DF, etc.) 62' RKB 6. Lease Designation and Serial No. ADL 28331 10. Well No. 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool For the Month of July ,19 83 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 0600 hrs, 06/17/83, Drld 17-1/2" hole to 2545'; ran, cmtd, & tstd 13-3/8" csg. Drld 12-1/4" hole to 10660'. Ran, cmtd & tstd 9-5/8" csg, drld 8-1/2" hole to 1.1260'. Ran logs. Ran, cmtd & tstd 7" lnr. Drld cmt to 11210' PBTD. Ran CBL. Ran 5-1/2" completion assy. Secured well & released rig ~ 0330 hfs, 07/03/83. SEE DRILLING HISTORY 13. Casing or liner run and quantities of cement, results of pressure tests 20" 91 5#/ft, U-40, weld conductor set ~ 80' 13-3/ Colds 9 -5/8 7", 3 SEE D 8" 72#/ft, L-80, Butt csg w/FS ~ 2531'. et II cmt. " 47#/ft L-80 Butt csg w/FS ~ 10649' 2#/ft, S00-95 Butt csg fr/10369'-11257'. RILLING HISTORY Instld w/1990# poleset. Cmtd w/2300 sx Coldset I II Cmtd w/500 sx Class G cmt. Cmtd w/350 sx Class G cmt. & 400 sx 14. Coring resume and brief description None 15. Logs run and depth where run DIL/SP/BHCS/GR fr/11253'-10595' FDC/CNL/GR/Cal fr/11256'-10595' GR fr/10595'-2525' CBL fr/11210'-10280' 6. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Area Drilling Engineer ~ SIGNED TITLE DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska' Oil apd Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 PqM/MI~? ~ Submit in duplicate DS 3-19 DRILLING HISTORY NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld 17-1/2" hole to 2545'. Ran 64 jts 13-3/8" 72#/ft, L-80 Butt csg w/FS @ 2531'. Cmtd 13-3/8" csg w/2300 sx Col dset III & 400 sx Col dset II cmt. ND 20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW - ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft, L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260' (06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal fr/11256'-10595'; GR to 2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg fr/10369'-11257'. Cmtd 7" lnr w/350 sx Class G cmt. Wash 9840'-10054'. Drld cmt to 11210' PBTD (07/01/83). Tstd lnr lap to 3000 psi - ok. Displaced well to 9.8 ppg NaC1. Ran CBL f/11210'-10280'. Ran 5-1/2" completion assy w/tail @ 10417' & pkr @ 10344'. Tstd tbg hanger & packoff to 5000 psi - ok. ND BOPE. NU tree & tstd to 5000 psi - ok. Secured well & released rig @ 0330 hrs,-07/03/83. CSM/DH19' sm 08/11/83 ARCO Alaska, Inc/'-'" Post Office ,.._x 360 Anchorage. Alaska 99510 Teiecho~e 9C..? ~.--, ~- August 8, 1983 Reference- Arco Open Hole Finals D. $. 3-19 6-28-83 CPL/Cyberlook 6-28-83 BHCS/GR 6-28-83 DIL/SFL/GR 6-28-83 FDC/CNL/GR (Poro) 6-28-83 FDC/CNL/GR (Raw) 6-28-83 GR Run 1 5" Sch Run 1 2" & 5" Run 1 2" & 5" Run 1 5" Run 1 5" Run 1 5" sign and return the attached copy as receipt of data. Kelly McFar land ATO-1429D Trans. # 451 Chevron D & M Dallas Drilling Exxon Ge tty Marathon Mobil D I STRIBUTI ON North Geology Phillips ~-v Caroling Smith ......... · ~4~ COPS Sohio A?.'~ .... m- ARCO Alaska, Inc.~.~-.'-- Post Office 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 July 13, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- Monthly 'Report of Drilling & Workover Operations Dear Mr.-Chatterton- Enclosed are Monthly Reports of Drilling and Workover Operations for the following' DS 14-23 DS 14-24 DS 13-27 DS:3-I9 Pingut'State #1 South Point State #1 and Well Completion or Recompletion Reports and Logs for' DS 7-24 DS 13-28 Also enclosed are revised Well Completion or Recompletion Reports · and Logs for- DS 1-25 DS 13-29 DS 7-25 Sincerely, M. A. Major Area Drilling Engineer MAM/CSM34-sm Enclosures ARCO Aiaska. Inc. is a Subsidiary of AHanlicRichfie!dCompany ~ ~-~ STATE OF ALASKA .-, ,-~,. ~ ALASKA .'iLAND GAS CONSERVATION C 'i1MISSION Mo T 'iLY REPORT OF DRILLING AND WORKOVER OPERATIO S-d · Drilling well)~ Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 83-92 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 50- 029-20971 76' 4. Location of Well at surface FSL, 397' FEL, Sec. 10, TION, R15E, UM I 6. Lease Designation and Serial No. ADL 28331 For the Month of, June , 19 83 5. Elevation in feet (indicate KB, DF, etc.) 62' RKB 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 3-19 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12.Depthatend~fm~nth~f~~tagedri~~ed~fishingj~bs~directi~na~dri~~ingpr~b~ems~spuddate~remarks Spudded well @ 0600 hfs, 06/17/83. Drld 17-1/2" hole to 2545'; ran, cmtd, & tstd 13-3/8" csg. Drld 12-1/4" hole to 10660'. Ran, cmtd & tstd 9-5/8" csg, drld hole to 11260'. Ran logs. Ran, cmtd & tstd 7" lnr. Drlg cmt as of 06/30/83. 8-1/2" SEE DRILLING HISTORY 13. Casing or liner run and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40, weld conductor set ~ 80'. 13-3/8" 72#/ft, L-80, Butt csg w/FS ~ 2531'. Coldset I I cmt. 9-5/8", 47#/ft, L-80 Butt csg w/FS ~ 10649'. 7", 32#/ft, S00-95 Butt csg fr/10369'-11257'. SEE DRILLING HISTORY Instld w/1990# poleset. Cmtd w/2300 sx Coldset III Cmtd w/500 sx Class G cmt. Cmtd w/350 sx Class G cmt. & 400 sx 14. Coring resume and brief description None 15. Logs run and depth where run DIL/SP/BHCS/GR fr/11253'-10595' FDC/CNL/GR/Cal fr/11256'-10595' GR fr/10595'-2525' 6. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ Area Drilling Engineer SIGNED TITLE DATE.__ NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 CSM/MR22 Submit in duplicate 3-19 DRILLING HISTORY NU 20" diverter and flow line. Spudded well @ 0600 hrs, 06/17/83. Drld 17-1/2" hole to 2545'. Ran 64 jts 13-3/8" 72#/ft, L-80 Butt csg w/FS @ 2531'. Cmtd 13-3/8" csg w/2300 sx Coldset III & 400 sx Coldset II cmt. ND 20" diverter system. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Drld FS & 12' new form. Tstd form to 11.2 ppg EMW - ok. Drld 12-1/4" hole to 10660' (06/26/83). Ran 274 jts 9-5/8" 47#/ft, L-80, Butt csg w/FS @ 10649'. Cmtd 9-5/8" csg w/500 sx Class G cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 8-1/2" hole to 11260' (06/28/83). Ran DIL/SP/BHCS/GR fr/11253'-10595'; FDC/CNL/GR/Cal fr/11256'-10595'; GR to 2525'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 sx Coldset I cmt & 125 bbls AP. Ran 19 jts 7" 32#/ft, S00-95, Butt csg fr/10369'-11257,. Cmtd 7" lnr w/350 sx Class G cmt. Wash 9840'-10054'. Drld cmt to 10369' as of 06/30/83. CSM/DH19'sm 07/08/83 ARCO Alaska, Inc. .----.., Post Office Bc Anchoraae. Alaska 99510 _ July 14, 1983 Reference: Arco Magnetic Tapes w/Listings 1-22 11-2-82 OH tape w/Listing ~1513 D.S. 3-19 6-28-83 OH tape w/Listing ~68387 DA Sch Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. ~ 430 Chevron D & M Dallas Drilling Exxon Getty Marathon Mobil DISTRIBUTION North Geology Phillips Prudhoe Bay R&D Caroling Smith Sohio State of Alaska 497' 97' lO 16 VICIN I'F"f' MA? AC ? zct,.l¢ AS- E~Lt. ILq- b OCA'l'lOtq5 )4= '11Z,9oo.64 L-Al' ~- 70* 13 /,,.OM~= 146*16'53.5Z7" V,/'-~LL zo 1/= 5, gF(~0zz2,57 x¢ -/I Z, 8-~Z .4 I LA1'= 7o:13'43,g57" ,JUN Abska Oil & Gas Cons, Oommission Anchora§e NORTH AMERICAN PRODUCI~G DIVISION ALASKA DISTRICT -- PRUDHOE BAY As- CU/I..7- BRAV,fiN~ No: MEMORANDUM State of Alaska ALASKA~L ~ CAS CONSERVATION COMMISSION TO~. V. ~h~ % ~// DATE:June 20, 1983 Chai'rm n~~  ~. FILE NO:10 SB/F ~r~: Lo~i~ C. S~ith k / TELEPHONE NO: C~ssioner FROM: ~en Le~7o~an ~trole~ Inspe~or SUBJECT:~i ~,~,/.~ (~n~ ,~... tness BOPE Tes ARCO's DS 3-1~, -; Sec. 10, T10N, R15E, U~], Prudhoe Bay Unit. SatUrday, June !8.,_ 1983 I departed my home at 3:15 PM for a 3:45- ~ showup and 4:45 PM departure via Alaska Airlines flight No. 341 for Deadhorse arriving at 7:10 PM. Weather: +52°F, Clear, no ~nd. Sunday, June I9,~ 1983 BOPE tests on DS 3-1~ began at ~':1'5 AM and. ~re completed at 11:00 AM. BOPE inspection report is attached. I departed Dead, horse via Alaska Airlines Flight No. 56 at 4:30 PM arriving in Anchorage at 6:10 P[-~ and at my home at 6:40 PM. In summary, I ~_itnessed successful BOPE tests on ARCO's DS 3-19. Att achme nt 02-00IA(Rev. 10/79) ot~ #4 ~ ,~/8i ..-. STATE OF ALASKA ALASKA OIL & GAS CONSERVATION CCMMISSION B ,O. P.E. Inspection Report Operator ~ _ _/~. ~ Well ~ ~ ~/F Location: Sec / O T/~/~F~:M A/,-/g Dril linq Contractor ERte Jul A,"~' /%. /9~ Repr e sent at ive i/~_/~ · /~a"s~n~ Set ~ m.~ ~-S- ~t. T~ ~,,~, ~ # ~a' ~epres~ntative ~~Z3~- location, General_ ~/~ Well Sign dP ~ Ceneral Housekeeping ~/~ Reserve pit (3/~ BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve-- Kill Line Valves Check Valve Test Pressure ACCUMULATOR SYSTEM Ful 1 Charge Pres sure ~ CD ~30 Pressure After Closure Pump incr. clos. pres. 200 psig Full Ch ~a~ge _Pressure Attained: N2 ~./O~ / Controls: Master ~emote ~:~ ~__ psig Dsig psiq rain ~ sec. min .~ sec. Blinds switch cover ~_~ _ Kelly and Floor Safety Valves · Upper Kelly ~r Kelly, Inside BOP Choke Manifold No. Valves.__ No. flanges. ~/O Adj ustab le Chokes Hydrauically operated choke Test Pressure Test Pressure Test Pressure Test Pressure Test Pressure Test Results: Failures / Test Time'-? ~-"'?" hrs Repair or Replacement of failed equipment to be made within . days and Inspector/Ccmmission office notified. · Remarks: .~_~-~%. _~~. /~- ~.'/'~" ~ ~. z~~ Distribution orig. - A0&02C cc-Operator cc - Supervisor Inspector June 8, 1983 ~r. Mark A. Major Area Drilling Engineer AP:CO Alaska, inc. P. O. Box 360 AnchoraRe, Alaska 9J~10 Re: ~rudnoe Bay Unit DS 3-19 ARCO Alaska, inc. Pe~it No. 83-92 Sur. Loc. 76'FSL, 397'FEL, Sec. 10, T1 Btmhole L~c. 537'FNL, 405'FF~L, Sec. 16, T101~, R15E, t~. Dear ~. Major: Enclosed is the approved application for permit ~o drill the above referenced ~'ell. If coring-is conducted, a one cubic inch chip fron each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A Continuous directional survey is required-as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. ~any rivers ~ .., ~n Alaska and their drainage ~ystems have been classified as important for the spawning or r.-:~igration of anadro~aous fish. Operations in these mreas are sub.~ect to AS 16.05~870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to operations you ~ay be contacted by the Habitat' Coordinator's Deoart~ent of Fish and Game. Office, _ ~. Pollution of any ~aters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations pror~ulgated thereun~]er (Title 18, Alask8 Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as am~ended. Prior to c~mncing operations you may be contacted by a representative of t!~e De~art~ent· ~ -of Enviro~ental Conservation. To aid us in scbeduling field work, please notify this office 24 hours prior to commencing installation of the b].o~-.~out Mr. Mark A. MmJor Prudhoe Bay Unit DS 3-19 -2- June 8, 1983 prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing~shoe is drilled. Where a dtverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before'drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. VerY truly '--J I '-.__.,,.,~-f~ /- C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Commission --Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. be ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 May 31, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 3-19, Permit to Drill Dear Mr. Chatterton: Enclosed is our application for Permit to Drill DS 3-19 and the required $100 filing fee. Attachments to the application include a plat detailing the section and plan views of the proposed wellbore; a proximity plat showing the subject wellbore's position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we expect to spud this well on June 15, 1983, your earliest approval will be appreciated. Sincerely, M. A. Major Area Drilling Engineer MAM/J G3/L40: tw Enclosures ARCO Alaska, Inc, is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ~-- ALASKA L~,L AND GAS CONSERVATION CO,v~MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL ~ DEVELOPMENT GAS [] SERVICE [] STRATIGF1APHIC [] SINGLE ZONE [~0X MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inco 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 76' FSL, 397' FEL, Sec. 10, T10N, R15E,UH(Approx.) At top of proposed producing interval 492' FNL, 11' FEL, Sec. 16, T10N, R15E, UM At total depth 537' FNL, 405' FEL, Sec.16, T10N, R15E, UM 9. Unit or lease name Prudhoe Bay Unit 10. Well number DS 3-19 11.Fieldandpool Prudhoe Bay Field Prudhoe Bay 0il Pool 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. RKB 62' PAD 26' I ADL 28331 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed Deadhorse miles 492 feet 3-15well 130' ~ 5823' TVD feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 11,219 ' MD, 9207 ' TVD feet 2560 06/15/83 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3513 psig@.____ Surface KICK OFF POINT2600 feet. MAXIMUM HOLE ANGLE 43 oI (see 20 AAC 25.035 (c) (2) psig@ 9207 ,ft. TD (TVD) 4131 21 i Proposed Casing, Liner and Cementing Program SIZE SETTING DEPTH QUANTITY OF CEMENT i Hole B0" ~7-1/2" 2-1/4" Casing 20" 13-3/8" 9-5/8" 7 Weight 91.5# 72.0# 47.0# 8-1/2" 29.0# 22. Describe proposed program: CASING AND LINER Grade Coupling H-40 WELDED L-80 BUTT L-80 BUTT L-80 BUTT Length MD TOP TVD 80' 36' 136' 2514' 36' 136' I 10,451 ' 1,041' 33' ~33' I I ' 10,184' 18452' I MD BOTTOM TVD 116' I 116' 2550' 2550' 0,484' 18669' 11,219' 9207' (include stage data) 2000# Poleset 2300sxCSIII & 400sxCS 11 500 sx Class"G"lst Stage 300 sx CS I 2nd Stage 400 sx Class "G" ARCO Alaska, Inc., proposes to directionally drill this well to 11,219' MD (9207' TVD) to produce the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack wi]l be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17# L-80 tubing, packer, and gas lift mandrels will be run. Provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. The packer will be set above the Sadlerochit. A Sundry Notice will be submitted when the well is to be perforated. A surface diverter will be installed and operationally tested prior to spud and at least dai]y thereafter. DS 3-19 will be 130' away from DS 3-15 at 5823' TVD. There are no closer wellbores anywhere downhole. · 23. I hereby certify that the foregoing is true and correct to the best of my knowledge The space below for Commission use Samples required [] Y ES Permit number APPROVED BY , · . Form 10-401 GRU3/PD31 CONDITIONS OF APPROVAL Mud log required i--}YES ~.N 0 Approval date ~,' /// ///// Directional Survey required I APl number ~,YES []NO 50- O SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE by order of the Commission June 8. 1983 Submit in triplicate ANNULAR PREVENTER BLIND RAMS PIPE RAMS PIPE RAMS RECEIVED 13-5/8" BOP STACK DIAGRAM Accumulator Capacity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultane- ously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test 1. Fill BOP stack and manifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark running joint with predeter- mined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and chokes and bypass valves on manifold. 4. In each of the following tests, first hold a, 250 psi low pressure test for a minimum of 3~ minutes, then test at the high pressure. 5. Increase presure to~__~O~_O p~~si and hold for a minimum of 3 minutes. ~-B+e~d pressure to zero. 6. Open annular preventer and close to~t~o~ pipe rams. Increase pressure to 50~ and hold for at least 3 minutes. Bleed pres- sure to zero. 7. Close valves directly upstream of chokes and open chokes. Increase pressure to 5000 psi & hold for at least 3 minutes. Bleed pressure to zero. 8. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 3 minutes. 9. Test remaining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. 10. Bleed pressure to zero. Open bottom set of pipe rams. 11, Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minutes. 12. Bleed pressure off all equipment. Open blind rams, Make sure manifold and lines are full of non-freezing liquid and all valves are set in drilling position. 13. Test standpipe valves to 5000 psi. 14. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 15, Check operation of Degasser. 16. Record test information on blowout preventer test form. Sign and send to Drilling Super- visor. 17. Perform complete BOPE test once a week and functionally operate'BOPE daily. Rev. 5/13/81 SURFACE HOLE D IVERTER SYSTEM. SCHEMATIC ARCO ALASKA INC'. _, r. .,.,,.,.--'--- I 0" HYD. OPR. BALL VAL'CE ~ .,.,,...---- WELL BORE ( SEE DETA IL ) ./'" .,,," ~ I 0" HYD. OPR. BALL VALVE // J//' I ALL 90° TURNS ARE "TEE" ~ I CUSHION I WELL RESERVE PIT AREA NOTE' FLOWL INE F DR ILL ING RISER 20" 2000 PSI WP ANNULAR PREVENTOR ',,,, ,,/ lO" DIVERTER LINE"'""' ~ ~ '""' Valves on diverter lines open automati- 20" cally when the annular preventer is closed. PIPE I O" HYORAUL IC OPERATED BALL VALVES "DETAIL" 202..601 ( CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE thru 8) (.9~thru (4) Casg (12 thru 2~): - (21 tt~rd ( 6 > Ad d: ~.~ 6/~/p$ YES 'NO 1. Is the permit fee attached .......................................... 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line 4. Is well located proper distance from other wells. 5. Is sufficient undedicated acreage available in thig pool .6. Is well to be deviated and is well bore plat includi~ .]- 7. Is operator the only affected party ......................... 8. Can permit be approved before ten-day wait ........... ® 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. · 22. 23. 24. 25. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is conductor string provided ........................................ ., Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. .. Is old wellbore abandonment procedure included .on 10-403 ............ Is adequate well bore. separation proposed ........................... Is a diverter system required ....................................... ~ Are necessary diagrams of diverter and BOP equipment attached ....... /~ Does BOPE have sufficient pressure rating - Test to ~O psig .. z~ Does the choke manifold comply w/AP1 RP-53 (Feb.78) .................. Additional requirements ............................................. Additional Remarks: REMARKS Geology: Engi .n~er ing: / WVA _i~ JKT/~j_HJH --'~' rev: 12/06/82 '" INITIAL GEO. UNIT ' ON/OFF POOL CLASS STATUS AREA NO. SHORE , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi ,. No 'special'effort has been made to chronologically organize this category of information, L'T~ T~PE 000 000 01,6 065 o00 000 004 065 o0o Ooo 012 065 000 000 004 065 000 000 004 065 o00 r)OO 002 065 o0(') o00 008 065 oo0 000 006 065 oo0 00o 004 065 E f'~ T ¢. Y 6O , :li;q 0 F P ? Ci", I, C, I' :, q' 4 t-: !.,.. fi ~;' rtl ].l~a9 I[..P 2,9922 ~2.7~0n O~ 36,0625 2.6n35 i{C~;I, 3642,0000 53,9687 N~AT 2.0996 '1.0547 II,D 6,7344 00,2500 GP 19,9531 2,5~25 },;Ch!_, 3476,0000 4q,.Sa25 ~.'~.a? ~.4297 55. -999, -999 . 73. - 9 99. - 9 q 9 , 546 8 20 750 15~ 4 ~'~ 4: 0 ! 3 757 25O 3 43 742 250 437 03 1 R 7 875 0 O 0 75O 5~: 0 B 20 9a6 250 250 25O '~75 2%o 250 25O 25.0, 2'50 I) T DT R H 0 B j' ~l?, D T R ~": !l ~:- (7 P [3 T 20.6563 76.6~]75 GR 24,1562 32.3'750 76,5625 GR 2.5762 NCNL, 25.8281 26,6, 875 94,7500 2,2949 36,0000 ?000,0!)00 iI, D 68.O0OO GR 2.451.2 ~tCN'L, 55.4063 ~PAT -999,2500 JLD -999,2500 CR -999.2500 -oq9.2~OO NRAT -9q9,25().} -999.2500 (;P -999.2500 ~':Cf;i', -9~9.250~ -9~9.2500 ILl> -999.250n -999.25~Q ~,.RAT 25.2656 21.5469 ~ 0000 410 ~1,~16 41,5000 23,4844 2994,0(,)00 2.6465 38,5625 ~0,8906 .; 5352, 5.5703 95,4375 3056,0000 ~' 8398 15,8984: 55,7500 1579,0000 4,0703 -999,2500 -999,2500 -999,2500 -999,2500 -999,2500 -999.2500 -999.~500 -999,2500 -~99 2500 -999!2500 -999 2500 -999,2500 -g99 2500 -g99,2500 -Ogq.2500 -999,2500 -999, .... 500 p P P h 'l' , · - 9 <'.~ 9 o ? h C' o C i; .-999 2500 I:':~ '909,2500 '999.2500 '999,250<) ' 2 5 00 '999 , , -999.2500 -909 2500 G'R - ,2500 t~CN i, -~99,2500 - 9 g 9,25 (} 0 I !, D -999,2500 GR - 999,2 !500 ~; C N I;, -g99,2500 -~.9.25oo -~gq, 2500 -g99.2500 -9qn 2500 G~ -9~9' .250n t,~CNb -oo9.2500 ~,~,~T -o99,250o GR -9o9,2~00 -ggg,~500 -9~)9.2500 -999 2500 -999 2500 -999 2500 -999 2500 -999. 2500 - 99 9,2 5:0 0 "9 99 - 99 9:' 2500 -999,2500 -99g'2500 -999,2500 -999'~500 -999,2500 -999,'2500 -999; 2500 '"99:9, ~500 -999,2500 -999,2500 -999,2500 -,999,2500 -999 2500 -999 2500 -999 2500 =999 2500 -999 2500 '999i2500 -g99 ~500 -999 2500 -99g 2500 -999i2500 -9Q9 2500 -999 2500 -999 2500 -g99,2500 -gg9,2500 -g99,2500 ? -999 P !-{ T - 9 g 9 CNt< -9q9 '" P n 'a' ~.. n C a 1,, I %., · b T ' g g 9.2500 (; ~ 74,~1'375 '99~'2500 DT 3,7500 -999 · 2500 I L 4~. 3..1. 3 ~ -999.2500 iI,D -999,2500 GR -999,2500 Nt~AT -999,2500 I[,,D -9~9.2500 GR -q99.2500 ~,;CNL '999,2500 ~R~,T -9q9,2500 IT.,D -999,2500 -~g9,.2500 NCN,[, -999,2500 N~AT -990.2500 -999 2500 .god ~ 2500 -099,2,500 N~AT -999.250o -g99.250o -999.2500 -999.25o0 -Qgg.250n II,D 'g99.2500 GR '9<~9.2500 -999.250n -999,2500 -o99.2500 -999,2500 -999 2500 '999,2500 '999.2500 ,,,999, ~500 i999,2500 999,2500 999.2500 ..999'2500 ..999,2500 - 9:99:' 2 5 0 0 -999 ~ 2500 '999,2500 ,0 ,.~9'9,2'500 '999,2500 '999,2500 '999,2500 '999,2500 '999,2500 '999,2500 '999,2500 -999 2500 -999,~500 -999,~500 -909,2500 '999.2500 '999,2500 '999,2500 '999,~500 '999 2500 -999~2500 -999,2500 3 5,3 ~. 2 5 ,,., r.} ~'? a, 250 ('1 i L ,v, .999 ,. 250 ¢..,~ D 'T -9o9.2500 .:~ 3.75 (! <' -999,2560 · ,,999,2500 -q99,2500 ' 9 !~ 9.250 - 99 g ,. 2 f:":',' 00 -999 2500 ' 9"') 9 ' ,',999' 2500 ,2500 - ~. 99,2 50 0 I L [.:, -999,2500 ,,,, ,,t , -999,,2500 '999,2500 2500 1 ~, P 2500 GR 2500 NCNL 2500 N P .A T -999,250o -9q9 o 2500 -999,2500 -,oq9,2500 -C~99,2500 Tt,,D -aC~9,2c, 00 GP -aa9,2500 -9q9,25(,0 -g~9,2500 -999,2500 -999.2500 -90~, 25;')0 -~Q9.25{)0 '*PAT -999 2500 -999, ~500 '999. 500 -9'99,2500 -999,2500 2500 - 2500 999, -999,2500 -999 2500 '999 2500 -999 ~500 -999 2500 -99g,2500 '999'~00 -999,~ O0 -~99.:2500 -999 2500 -999;2500 -999,2500 -999,2500' -999,2500 -.999,2500 999,2500 -999,2500 -999 2500 -999,2500 -999,2500 -999,2500 -999,2500 -999 2500 -999:2500 -999,2500 .a9~2500 2$oo -~9q 2500 ,2500 ' 9 <) 9, 999 · ~, ' g g 9, 99. ' 9 q 9. '999. -9 <~9 , '9<}9, 'q99, -099, 35. 2500 2, 500 2500 2500 9375 25 C)' 0 2500 2500 2500 2500 2500 343 ~ 2500 500 250n 250'o 250O 2500 J. 562 250n 2500 2500 ~500 ~.375 250n 2500 250n 937% 2500 25 {', 0 2500 21.~7 I: I,, M D T t::< H i':) ~:: P T D T - 999 ,. 2500 ..,'999,2500 -999.2500 -999 2500 -999 2500 -999 2500 -999,2500 -999,2500 GR -909,2500 -999,2500 ~,,~R,A T -999,2500 ILD -999,2500 -999,2500 -9n9,2500 -999,2500 I,t,P 9<:)9,2500 (';~ . .gag. 2500 -o99.2500 Ii.,,D -999.2500 GF -909,2500 '~CNL -~09.250n ~PAT -909.2500 IL, D -q99,2500 -~99.2500 -909,250n t',)RAT -999,~500 -999, 500 .999,,~5o0 -999,2500 -999 ' 2500 9 99,25::00 .999,2500 999 ,~:500 -999,2500 -99:9,:2500 -999~'500 -999,~500 -999,2500 -999'2500 -999,2500 -999,2'500 -999,2500 -999,2500 -999,2500 '999,,250',0 -999,2500 -999.2500 -999.2500 -999,]500 -999,2500 -999,2500 -'999,2500, -999,2500 -999,2500 '999,2500 -999,2500 -999,2500 -999 2500 '999i2500 -999 2500 -999 2500 -9q(9 2500 DT '~99 2500 ~ 1 , 1. 406 ,,9q9,2500 DT - 99 9,2 50 C) I~' )~ C) P -9q9 25(>0 -qq. 9,2500 !')1' -99q,2500 r.~ kj r,1 p -9c~9.2500 ~1~' 33.6563 "q99.2500 '999,2500 (;R -999,2500 '999~2S00 NRAT -999. 250*') t, Li~ - 999, 500 G ~ -999, 500 N C I\i !.11~ -g99,2500 N ~:~ A -g99 2500 ~ ,~. -qo9,2500 GR -9o9,2500 NC~:~D -999°2500 -999.2500 -9~9.2500 -Q99.2500 r.ICNI, -9q9.2500 NRa? -999.2500 lbo -999,2500 G~ -999.2500 NC~Jb -q09,2500 ~RAT -0~9,2500 GR -ggg.250n -999.2509 r.tgAT -999 2500 '999' ,2500 -999,2500 -999,~§00 -999,2500 -999,2500 '999,2500 -999'~500 '999 2500 ' 999 ~500 -999 2500 '999 2500 '999,2500 -999.2500 -999,2500 -999'2500 -999.2500 -999,2500 -999 2500 '999:2500 '~99,2500 -999,2500 -999,2500 '999,2500 -999.2500 -999,~500 -999,2500 -999,2500 -99g,2500 -999.2500 -999.2500 -999.2500 -999,2500 999 9 9 9 - q.... o. q.., 250 O.:.[ I., ,, 999.2500 [', 25 0 0 (:; P, -g99 2.'50(:) -999 '2500 - 9":~ 9 25O0 -~99 2500 -,909 2~:0o -0,99 2500 -9~,~q 250O -009 250O 40 ~563 - 99 'a ,, 2 r.; (') 0 I [.., -9q9,2500 -999,2500 - 999,2500 (; R -9o9 250n ~iCN -990' .... · ,2500 ~iPAT qgO,2 .... 0,0 ILD - 999,2500 G'a -909,250o !'si C N' r,.., ".999 , 250'0 ~]RAT -999 2500 ibp -999 2500 GR -999 2500 -999.2500 -999,250(t GR -999.2500 '999.2500 - g 9 9.2 500 -999.2500 ,,.999'2500 ,,999,2500 -999,2500 ILl) -999,2500 GR -909,2500 t,lCN[,, -999,2509 N~AT -99q.2500 it.,D -999,2500 GR -099.2500 -999,250n -g0~,2500 -ot~9,2500 -999.2~00 f:~AT -r.~q9.2~On II,P -009.2500 ,-,9 q 9.250~'1 -999.2500 -999,2500 -999,2500 -999,2500 ~999,2500 ~999,2500 .999,2500 999'~500 '999 2500 'gg9'999 ,,999 ~500 .-999.2500 99 ?' 2500 -999,~500 "' 999' 2500 -999 2500 -999. ~.500 -999,2500 -999,~500 -999,2500 -999,2500 -999,2500 -999,~500 -999,~500 -999,2500 -999.~50o -999.~500 -999,2500 -99g.2500 -9o9.25o0 -g99.250o -9o9.2500 .999,2500 -g99,25oo -999.25oo t~ · ' 9 <:) 9 ' SS,6q'75 37, .o09,2500 :I:1, -9q9,2500 F) T ' ~ 2~00 - 9 q 9, 42, ]439 . q q c,, 2 5 (:, 0 -9q9,2500 C -9',~9, PSO0 ~tl, 3 ,'1. '3 ~ -9~q,2SO0 t'~T .9aq.2500 -On9,2500 · ~., . -qag.250n [,~ ',, 9 c,} 9,2 50 o ,I' -. 9 a 9,2500 . o 99.2 5 00 ~'~ C N b -999,2500 -9 9 9 2 5 0 0 G -999 ~500 - 9 9 9,2 5 0 0 1515, - 9 q 9 2 500 G 0~9 2500 - 99 9.2 5 0 0 ].. , 5 ' GR - 9 99,2.00 - q 9 9,2 S 0 0 -999,2500 '999,2500 GR -999,2~00 -~9~, 250o NCNL -q09,2500 -999,2500 1 -gq9,2500 =909,250n -o<~9,2~00 ILO -9q9,2509 -99o, 250n -999 2500 -999 2500 -999 2500 -999 2500 '999,2500 -999,2500 -999,2500 -999,~5,00 -999,~500 '999:,2500 -999,2500 -099,2500 -999,2500 -999,2500 -999,2500 ':999,2'~00 -999,2500 '999,2500 -999,2500 -999,25'0'0 -999 2500 'g99,2500 '999,2500 '999,2500 i909,2500 999,2500 999,2~00 -999.2500 999.2500 999,2500 q99,2500 -999,2500 99 2500 -.9 ...... ..o q ,250 :)6 * 250 . . 7,65 - q ,99,250 -9O9. 250 ,,,9 99. 250 4 4 ,, ('.) () 0 · . 6 "' ' .o, o~ 250 ,,,90q, ,' 53,437 - 9 ::i) 0, ? 50 - 9 9 9, - 9 ",)° 250 . ~ -99° 250 -999 -009 .-!. 4 2 50 "2~0 . 250 -~q9. 250 30. ~; 4 3 ' 9 '4, C' .7 I !.. >! [:;, T D T G P [~-f, ,,, 9 99,2500 I [, -999,2500 GR -999 * 2500 ' 999.250 n T I., t) '999, ~500 gR -999.~500 NCNL -909,2 50 0 !';~ re A q' -999. 2500 -999 . 25(3!) GR -999,2500 NPAT -999,250n it.r> -099.2~00 GR -0o~9.2%00 r4CNI. -999,2500 -qq0,2500 -099,2500 -,c.iC, 9,2 ~'S 00 ',.' C :" !_, -909. 250"} -999.2~00 -qo9,250,~ ~,, C,~ 1'.., -ggq,~_NOO '999,2500 -999,2500 '999,2500 '999,2500 -999 2§00 -99~B00 -~0g,2500 -999,2500 '999,2500 "999,2500 -999,2500 -O99,2500 999,2500 ~999,2500 -999.2500 -999,2500 . gv; soo -999,22500 "'ggg, 2500 '999 2500 -999~2500 -999,2500 -999,2500 -099 250o -999 2500 -9992500 -909.2500 -999,2500 -999.25O0 -q99.2500 :999.2500 999,2500 -999,2500 -9~9,2500 2500 :]' f., ,~ 2500 4.375 25O (~ 2.500 ~,' [-! r:'~ ~;'~, ?. 5 (} 0 r;; g ,13 '7 -. 9 9 9,250 0 I L !') - 9 9 9.2 5 0 0 (::;'P -()99,2~00 N C. :N.'!r., -999,750(~ -999 500 GR -9'~9 500 t'4CNI., "999 2500 NRAT -999.2500 IL, t) -999,2500 r,tCNb -999,2500 NRAT -999,2500 -qe9 250o .669' ' ,2500 r,,~ C ~.: l., -999,2500 ."'.~R ~ T -~99,2500 I[,D -9q9,250() ttCf,!b -999.2500 -999,2500 -999,2500 -999,2500 -999 2500 -999 2500 -999 2500 -999 2500 -999,2500 -999 '2500 -999,2500 -999 ' 2500 -999.2500 -999,2500 -999,2500 -999,2500 -999 2500 '999.2500 '999.~500 '999.2500 -999,~500 -999,2500 -999.2500 '999.2500 -999.2500 999,2500 9~9,2500 999.2500