Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout183-163MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, July 30, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 14-36 PRUDHOE BAY UNIT 14-36 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/30/2025 14-36 50-029-21039-00-00 183-163-0 W SPT 8439 1831630 2110 1640 1654 1661 1661 0 7 6 6 4YRTST P Bob Noble 5/17/2025 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 14-36 Inspection Date: Tubing OA Packer Depth 30 2494 2460 2453IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN250518165543 MITOP000011024 BBL Pumped:4.8 BBL Returned:4.6 Wednesday, July 30, 2025 Page 1 of 1           MEMORANDUM TO: JimRegg� l SIZI'Zr21 P.I. Supervisor [ 2 FROM: Adam Earl Petroleum Inspector Well Name PRUDHOE BAY UNIT 14-36 Insp Num: mitAGE210518193350 12e1 Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 19, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC 14-36 PRUDHOE BAY UNIT 14-36 Sre: Inspector Reviewed By: P.I. Supry .J-PR— Comm API Well Number 50-029-21039-00-00 Inspector Name: Adam Earl Permit Number: 183-163-0 Inspection Date: 5/14/2021 Packer Depth Well 11-36 - Type lnj W TVD 8430 Tubing PTD Type Test s"I Test psis 2110 IA BBL Pumped: 4 2 BBL Returned: 4' OA Interval naTsr P/F 1' ✓ Notes: MIT IA ' Pretest Initial 15 Min 30 Min 45 Min 60 Min 1642 - 1638 -1 1639 - 1637 ' 133 2397 - I 2359- 2348 " s 21 21 - 20 - Wednesday, May 19, 2021 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday,May 25,2017 TO: Jim Regg ,—I P.I.Supervisor 1� `�,�l Z-t c `i SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 14-36 FROM: Brian Bixby PRUDHOE BAY UNIT 14-36 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry \I-P--- NON-CONFIDENTIAL -- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 14-36 API Well Number 50-029-21039-00-00 Inspector Name: Brian Bixby Permit Number: 183-163-0 Inspection Date: 5/25/2017 Insp Num: mitBDB170525144407 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well ! 14-36 ' Type Inj [w -TVD 8439 ' Tubing 1324 1326 " 1326 ' 1331 PTD 1831630 - Type Test SPT Test psi 2110 IA 35 2497 " I 2480 " 2476 BBL Pumped: 5.4 ' ;BBL Returned: 4.5 OA 20 20 22 23 ' J Interval 4YRTST P/F P V/ i_ Notes: SCANNED j U L 1 1201 t?. Thursday,May 25,2017 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission / DATE: Friday,May 31,2013 TO: Jim Regg Ti1c f l 3 P.T.Supervisor ( � SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC 14-36 FROM: Lou Grimaldi PRUDHOE BAY UNIT 14-36 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry L11�1�- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 14-36 API Well Number 50-029-21039-00-00 Inspector Name: Lou Grimaldi Permit Number: 183-163-0 Inspection Date: 5/29/2013 Insp Num: mitLG130529160522 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 14-36 'Type Inj W TVD 8439 , IA 670 2503 . 2478 . 2450 - 2456 - 2458 PTD 1831630 Type Test SPT Test psi 2109 OA 347 478 444 -j 446 456 467 _ Interval 4YRTST 'P/F P ✓ Tubing 991 - 990 H 988 900 973 . 995 3.2 bbl's MeoH pumped,3.5 returned.During test waterflood went down for 10/15 minutes then u ra Notes: p P g came back up.'Tubing pressure/temperature fell off influencing IA pressure.Held for additional 30 minutes for stabilization. SCANNED FEB 2 6 2014 Friday,May 31,2013 Page 1 of 1 C~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator,. PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 07, 2009 i~,J~~'l,i' • by ~, - ~'-`e LEC ~ _ ~0~9 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 14 Dear Mr. Maunder, rv S ..~ ~ _ ~. ~_. ~ ~/gyp: .u~~l~4t r_:.. I g~-- ~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 14 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-14 Date: 12/05/09 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 14-otA 1931850 500292031701 Sealed Conductor NA NA 14-02C 2071150 500292031803 Sealed Conductor NA NA 14-03A 1961290 500292031901 Sealed Conductor NA NA 14-04A 1961640 500292032001 Sealed Conductor NA NA 14-05A 1920010 500292032701 Sealed Conductor NA NA 14-06A 2040360 500292032801 Sealed Conductor NA NA 14-07 1780660 500292032900 Sealed Conductor NA NA 14-08A 2022100 500292033001 Sealed Conductor NA NA 14-09B 1820340 500292053402 Sealed Conductor NA NA 14-10 1801300 500292052800 Sealed Conductor NA NA 14-11A 2051260 500292052901 Sealed Conductor NA NA 14-12 1811090 500292063100 Sealed Conductor NA NA 14-13 1811010 500292062400 Sealed Conductor NA NA 14-14 1811020 500292062500 Sealed Conductor NA NA 14-15 1810840 500292061100 Sealed Conductor NA NA 14-16A 1971670 500292060801 Sealed Conductor NA NA 14-17A 2030010 500292056201 Sealed Conductor NA NA 14-18B 2071290 500292055102 Sealed Conductor NA NA 1a-19 1810450 500292057800 Sealed Conductor NA NA 14-20 1810700 500292059800 Sealed Conductor NA NA 14-21A 2051070 500292075601 Sealed Conductor NA NA 14-22A 1921230 500292074701 Sealed Conductor NA NA 14-23A 2090200 500292075701 NA 4 NA 25.50 10/20/2009 14-24 1830910 500292097000 NA 0.6 NA 3.40 10/20!2009 14-25 1831020 500292098100 NA 2.1 NA 15.30 11/16/2009 14-26 1811100 500292063200 Sealed Conductor NA NA 14-27 1831700 500292104600 NA 3 NA 17.00 10/25/2009 is-28 1820120 500292070800 Sealed Conductor NA NA 14-29 1811680 500292068000 Sealed Conductor NA NA 14-30 2050940 500292067901 Sealed Conductor NA NA 14-31 1831110 500292098900 Sealed Conductor NA NA 14-32 1831220 500292099900 NA 0.6 NA 3.40 10/19/2009 14-33 1831250 500292100200 Sealed Conductor NA NA 14-34 1831330 500292101000 NA 7.3 NA 47.60 10/20/2009 14-35 1831420 500292101800 Sealed Conductor NA NA 14-36 1831630 500292103900 NA 0.7 NA 3.40 10/20/2009 14-37 1880490 500292181000 NA 1.3 NA 5.10 10/20/2009 14-38 1881030 500292186200 NA 0.8 NA 3.40 10/24/2009 14-40A 2011350 500292187501 Sealed Conductor NA NA 14-41 1920960 500292229000 NA 0.8 NA 6.80 10/18/2009 14-43 1921080 500292229600 NA 1.4 NA 10.20 10/23/2009 14-44A 2021930 500292257301 NA 10 NA 88.40 11/24/2009 STATE OF ALASKA ALAS~L AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS ~' o~~D9 1. Operations Abandon ~ Repair Well ~ Plug Perfora6ons ~ Stimulate~ Other Q BRIGHT WATER Pertormed: Alter Casing ~ Pull Tubing~ Pertorate New Pool ~ Waiver~ Time Extension~ TREATMENT Change Approved Program ~ Operat. Shutdown ~ PerForate ~ Re-enter Suspended Well ~ Polvmer/Surfactant 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ~ Exploratory ~ 183-1630 ~ 3. Address: P.O. Box 196612 Stratigraphic^ Service Q 6. API Number: Anchorage,AK 99519-6612 50-029-21039-00-00 8. Property DesignaGon (Lease Number) : 9. Well Name and Number. ADLO-028312 ~ PBU 14-36 - 10. Field/Pool(s): . Prudhoe Bay FIELD / Prudhoe Bay oil POOL 11. Present Well Condition Summary: Total Depth measured 9565 - feet Plugs (measured) Fill (u~ 9470' 12/92 feet true vertical 9251.01 - feet Junk (measured) None feet Effective Depth measured 9470 feet Packer (measured) 8694' true vertical 9163 feet (true vertical) 8439' Casing Length Size MD ND Burst Collapse Structural Conductor 80 20" Surtace - 80 Surface - 80 Surface 2605 13-3/8" 72# L-80 Surface - 2678 Surface - 2678 4930 2670 Intermediate Production 8993 9-5/8" 47# L-80 Surface - 9065' Surface - 8788 6870 4760 Liner 809 7" 29# L-80 8721 - 9560 8465 - 9246 8160 7020 Liner Perforation depth: Measured depth: see attached - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# L-80 Surface - 8713' Surtace - 8457' 4-1/2" 12.6# L-80 8721' - 8787' 8457' - 8527' Packers and SSSV (type, measured and true vertical depth) 9-5/8"X5-1/2" BKR FB-1 PKR 8694' 8439' ~ ~4.T7'~ `a~e 12. Stimulation or cement squeeze summary: ~q:1 ~ ~, , r~_ ~~ ~+~~~~~wd ,~ ,< ;; ~ ~~~ t I l d ~ nterva s trea e (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 15974 1303 Subsequent to operation: 11838 1127 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^ Service ^~ - Daily Report of Well Operations X 16. Weii Status after work: Oil Gas WDSPL GSTOR ^ WAG ^~ ~ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 9/21/2009 ,.. Form 10-404 R sed 7/2009 ~~ ~"' `~' ~ Submit Original Only ~~ '~-S"e 14-36 183-163 PERF ~4TTACHMENT n U Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 14-36 8/26/84 PER 9,161. 9,191. 8,876.01 8,903.86 14-36 8/26/84 PER 9,210. 9,240. 8,921.51 8,949.38 14-36 8/26/84 PER 9,250. 9,270. 8,958.67 8,977.24 14-36 8/26/84 PER 9,280. 9,308. 8,986.52 9,012.5 14-36 12/20/89 APF 9,056. 9,080. 8,778.73 8,800.98 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE . ~ ~ 14-36 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 9/17/2009;T/I/0=1050/480/20. Temp=lnj. Brightwater project. Pumped Brightwater [treatment per procedure. iPumped 586 gallons EC9360Afrom TIFU124520A ~ Pumped 1334 gallons EC9378A from AWXU630133A ~Pumped 1605 gallons EC 9378Afrom EXFU051951A ( Pumped 781 gallons of EC9360A & 2939 gallons of EC9378A for the day. ~Continued WSR to 9-18-09 9/18/2009`T/I/0=1100/480/20. Temp=lnj. Brightwater Project. Pumped Bright Treatment j per procedure. j Pumped 3573 gallons polymer from EXFU051951 ? Pumped 2575 gallons polymer from AWXU630133 transfered from ~CLGU240010 ~ Pumped 1263 gallons surfactant from TFU124520 ;Continued WSR to 9-19-09 9/19/2009ET/I/0=1100/480/20. Temp=lnj. Brightwater Project. Continue from 9-18-09 ~ pumping Brightwater Water treatment per procedure. ~ Pumped 4008 gallons of polymer from tank EXFU051951 _ transfered from !TIFU324149 j Pumped 2546 gallons of polymer from AWXU630133 _ transfered from ' CLGU240010 ; Pumped 1484 gallons of surfactant from TFU124520 ~Transferred EC9378A from TIFU348365 to AWXU630133 (XXX gallons) did ~ not pump today. ; Pumped a total of 6554 gals of Polymer, pumped a total of 1484 gals of ( Surfactant. 9/20/2009~T/I/0=1100/480/20.~ ~Temp=lnj.~ BrightwaterProject continued from 9-19-09.~ ~ Finished pumping Brightwater chemicals @ 1900 hrs. iSurfactant TIFU124520 pumped 3832 gallons ~ Surfactant AWXU630144 pumped 903 gallons. Has 4154 gallons left in tank moved to X-28. Polymer AWXU630133 pumped 1360 gallons ~ Polymer EXFU051951 pumped 5200 gallons ~Polymer CLGU240010 pumped 5200 gallons (off loaded into AWXU630133) ~ Polymer TIFU324149 pumped 4923 gallons (off loaded into EXFU051951) ; Polymer TIFU348365 pumped 3519 gallons (off loaded to AWXU630133) HAS ;31" - 1704 GALLONS IN TANK moved to X-28. ~TOTAL VOLUMES: Pumped 20202 gals of EC9378A Polymer. Pumped 4735 gals of EC9360A Surfactant. ~Water injection rate started @ 10,000 BPWD and was between 9,800 to 10,200 BWPD. Total pump time was 78 hrs. Final WHPs=1120/480/20. `SC=Closed. WV, SSV, MV=Oqen. IA, OA=OTG. NOVP. ~ MEMORANDUM To: Jim Regg ~ P.L Supervisor '`~~~ 7('ZZ-(0 ~ FROM: Chuck Scheve Petroleum Inspector • State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, June 1Q 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 14-36 PRUDHOE BAY UNIT 14-36 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.L Suprv .~ ~-' Comm Well Name: PRUDHOE BAY UNIT 14-36 Insp Num: mitCS090606074622 Rel Insp Num: API Well Number: 50-029-21039-00-00 Permit Number: 183-163-0 ~ Inspector Name: Chuck Scheve Inspection Date: 6/5/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. We~l 14-36 Type Inj W 1'~ 8439 ~ jA 125 2500 2450 2450 P.T.D 1831630 TypeTest SPT Test psi Interval antTST p~F P f 2109.75 j QA Tubing 15 tzso 30 izso 30 i2ao _ 30 izso NOtes• Pretest pressures observed and found stable . ,rt,;- ~~,~, , ~ ~ ~ ,,%~~1;; k:"~..~..w. . _ ~_ _ Wednesday, June 10, 2009 Page 1 of 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well - MPI-09 MPI-09 J-.()Q - (\"..):) ___ ., ~:I-~"-'~01=L1 [ NK-08A G NK-08A 18-34 iG\Ç'" it,lf' 04-05A í r¡ 3 .. I 'j l~ 18-05Al (, ). - :2. . G 07 -36 i q '7 - { t 'I 14-36 18 J.. j (3 C-13A I q 7 - ; '1 J U-12 18S--/~Á. R-21 ¡ ð3 '. 11.tJ R-12 í93-· 0))'" E-16 /Sc - t;' :3 J-23 I 8 7.. C J t F-31 I 3 ~ - 1)-7 H-35 G 'i .... J L.f q Job# 10563225 10980572 10772241 10560316 10703956 10564525 10703939 10563112 10866557 10564527 11075900 10674388 10687647 10564529 10663003 10703943 10563217 10563216 Log Description INJECTION PROFILE INJECTION PROFILE INJECTION PROFILE PSP GLS PPROF W/DEFT PSP LDL PRODUCTION PROFILE LEAK DETECTION LOG LEAK DETECTION LOG INJECTION PROFILE MEM PROD & INJECTION PROFILE LDL PRODUCTION PROFILE PSP PPROF W/GHOST/DEFT PRODUCTION PROFILE SBHP SURVEY SBHP SURVEY PPROF W/GHOST PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ) ( ;})'v (,0~ì ì h, .- r/.,-(,'-(' ) - SCi~NNED SE? ~ Date 10/05/03 06/09105 04/04/04 10/22/03 11/27/03 09/27/03 10/24/03 10/13/03 07/14/04 09/29/03 07/05/05 10/27/07 09/20/03 10/01/03 03/10/04 10/28/03 09/28/03 09/27/03 c 'ìíìOt:: FL.;' J 07/20/05 NO. 3438 ,~7T lþ Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CD Color - ~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth F1/' J "'k ,f } ! ! ('1 /! , Received by: ljr~\I''. '. L) vth..c·" ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COIVIIVlISSION Mechanical Integrity Test Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay / PBU / OS 14 06/10/05 Donald Reeves Packer Depth Well 14-36 Type Inj. S TVD 8,439' Tubing P.T.D. 1831630 Type test P Test psi 2,500 Casing Notes: 4 year MIT-IA to 2500 psi. Chuck Scheve declined to witness Well Type Inj. TVD Tubing P.T.D. Type test Test psi Casing Notes: Well Type Inj. TVD Tubing P.T.D. Type test Test psi Casing Notes: Well Type Inj. TVD Tubing P.T.D. Type test Test psi Casing Notes: Well Type Inj. TVD Tubing P.T.D. Type test Test psi Casing Notes: Test Details: Pretest 1,300 120 Initial 1,300 2,500 15 Min. 30 Min. 1,300 1,300 2,480 2,470 SC.ANNED JUL 0 t¡ 2.005 TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test Notes: If the test was not AOGCC witnessed, leave the "AOGCC REP:" box blank. MIT Report Form Revised: 06/19/02 MIT PBU 14-36 06-1 O-OS.xls !§d2- b\ \3\05 ~ 1~3 \~ Interval P/F 4 P .¡,../' Interval P/F Interval P/F Interval P/F Interval P/F INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover o = Other (describe in notes) ARCO ~ls_~k_~_; Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 3-22-93 REFERENCE: ARCO CASED HOLE FINALS Prod Profile ]nj Profile Prod Profile z~J ~zome ~k Dete~t~To~e/?emp Pzod Pzo~le Pzod Pump-Z~ ~owmete~ Please sign and return the attached colby RECEIVED. BY_~~ Have A Nice Day! Sonya Wallace ATO-1529 as receipt of data. AP PROVED__~,J~__ Trans# 93040 CKmco Camco Camco Camco Camco Camco C~__mCO Camco Camco Camco # CENTRAL FILES # CHEVRON D&M # LUCILLE JOHNSTON # EXXON MARATHON # MOBIL # PHILUPS PB WELL FILES R&D # BPX # STATE OF ~KA TEXACO ARCO .A~ka, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 11-3-92 REFERENCE: ARCO CASED HOLE FINALS 10-3-92 Prod Profile Run 1, [~' Camco 9-28-92 Leak Detect (Flexstak) Run 1, [~' Camco 9-14-92 InJ Profile Run 1, [~' Camco 9-29-92 InJ Profile Run 1, [~' Camco 10-2-92 Prod-InJ (Flexstak) Run 1, [~' Camco 9-19-92 Leak Detect Run 1, ~' Camco 9-26-92 GR/Collar Run 1, ~' Camco 9-27-92 GR/Collar Run 1, ~' Camco 9-25-92 Prod Profile Run 1, ~' Camco 9-14-92 Prod Profile Run 1, ~' Camco 10-2-92 lnJ Profile Run 1, ~' Camco 9-4-92 Prod Profile Run 1, ~' Camco 10-4-92 lnJ Profile Run 1, ~' Camco 9-26-92 Prod Profile Run 1, ~' Camco 9-26-92 GR/Collar Run 1, ~' Camco 10-5-92 InJ Profile/PITS Run 1, ~' Camco 9-27-92 InJ Profile Run 1, ~' Camco 9-19-92 Leak Detect Run 1, ~' Camco 9-27-92 Prod Profile Run 1, 5~' Camco 10-4-92 Inj/Shut-In Temp Run 1, 5" Camco 10-2-92 InJ Profile Run l, ~' Camco 10-2-92 InJ Profile (Flexstak) Run 1, [~' Camco 10-1-92 , InJ Profile Run 1, ~' Camco 9-15-92 InJ PrOfile Run 1, [~' Camco 9-17-92 Prod Profile (Flexstak) Run 1, [~' Camco 10-1-92 Prod Profile Run 1, ~' Camco 9-28-92 GR/Collar Run 1, ~' Camco 9-28-92 Prod Profile Run 1, [~' Camco 9-15-92 Prod Profile Run 1, [~' Camco 10-1-92 Prod Profile Run 1, [~' Camco Ple.e sign and return ~le attac/I}e~d copy. receipt of ~C E [ V E D RECEIVED Have A Nice D~. //- v ~/aska 0il ~nac~0~; ~o_n~52W?ce ~s5~55~-~- # CENTRAL FILES # CHEVRON # LUCILLE JOHNSTON # EXXON # MOBIL # PHILI31'S PB WELL FILES # BPX # STATE OF ~KA STATE Of ALASKA ~-,....., ~ -' ALASK/'~-"IL AND GAS CONSERVATION C( :MISSION REPORT SUNDRY WELL OPERATIONS 1. Operations performed: Operatmnshutdown __ Stirnu,ate ~ P,uooing __ Perf°rate~ I G Pull tubing Alter casing Repair well 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM At effective depth 2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM At total depth 2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM 5. Type of Well Development Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 73' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-36i 9. Permit number/approval number 83-163 10. APl number 50 - 029-21039 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9565 feet 9251 feet Plugs(measured) Fill @ 9470' MD (12/22/92) Effective depth: measured 9470 feet true vertical 9163 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 375 sx PFII 80' 80' Surface 2605' 13-3/8" 2000 sx Fondu & 400 sx PFC 2678' 2678' Production 8993' 9-5/8" 500 sx Class G & 300 sx CS I 9065' 8788' Liner 809' 7" 300 sx Class G 9560' 9246' Perforation depth: measured 9056-9080'; 9161-9191'; 9210-9240'; 9250-9270'; 9280-9308' true vertical 8778-8801 '; 8876-8904'; 8921-8949'; 8958-8977'; 8986-9012' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713' MD; 4-1/2", 12.6#, L-BO, PC tubing w/tail @ 8787' MD Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230' MD; Baker packe~r~EB~. @ 8694' MD 13. Stimulation or cement squeeze summary '~% ~ _r Intervals treated(measured) See attached. ~:~= Treatment description including volumes used and final pressure 14. Representative Daily Average Production or miection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation .... 16789 -- 1649 Subsequent to operation 19916 -- 998 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Iniector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Engineering Supervisor :orm 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 14-36i DESCRIPTION OF WORK COMPLETED FILL CLEANOUT/AClD PERF WASH & STIMULATION TREATMENT 11/30/92: RIH & tagged top of fill at 9283' MD. 12/5/92: MIRU & PT equipment to 4300 psi. RIH w/CT & performed a fill cleanout down to 9496' MD, then reciprocated an acid wash across the perforations at: 9056 - 9080' MD (Sag) 9161 - 9191' MD (Z4) 9210 - 9240' MD (Z4) 9250 - 9270' MD (Z4) 9280 - 9308' MD (Z4) Ref. Log: BHCS 12/31/83. Jetted 29 bbis 12% HCI w/10% Xylene @ 3 bpm, then surged well w/nitrogen. POOH w/CT. Rigged down. I 2/1 6/92: Performed a fullbore Chem Frac Stimulation treating the perforations (listed above) as follows: MIRU & PT equipment to 5000 psi, then pumped: a) 50 bbls 15% HCI w/10% Xylene @ 5 bpm, followed by b) 50 bbls 7.5% HCl/Musol @ 10 bpm, followed by c) 25 bbls 1% KCl Water Spacer @ 10 bpm, followed by d) 200 bbls 2% Hydrogen Peroxide @ 10 bpm, followed by e) 25 bbls 1% KCl Water Spacer @ 10 bpm, followed by f) 100 bbls 7.5% HCl @ 10 bpm, followed by g) 50 bbls 1% KCl/Foam Flush @ 10 bpm, followed by r) s) t) u) v) x) Y) z) 50 bbls Meth Water, followed by Shutdown. h) 60 bbls 1% KCl/Nitrogen/Foam Diverter @ 2 bpm, followed by i) 50 bbls 1% KCl/Foam Spacer @ 15 bpm, followed by j) 50 bbls 7.5% HCI/Musol @ 15 bpm, followed by k) 25 bbls 1% KCl Water Spacer @ 15 bpm, followed by I) 200 bbls 2% Hydrogen Peroxide @ 15 bpm, followed by m) 25 bbls 1% KCl Water Spacer @ 15 bpm, followed by n) 100 bbls 7.5% HCl @ 15 bpm, followed by o) 50 bbls 1% KCI/Foam Flush @ 15 bpm, followed by p) 60 bbls 1% KCI/Nitrogen/Foam Diverter @ 2 bpm, followed by q) 50 bbls 1% KCl/Foam Spacer @ 20 bpm, followed by 50 bbls 7.5% HCl/Musol @ 20 bpm, followed by 25 bbls 1% KCl Water Spacer @ 20 bpm, followed by 200 bbls 2% Hydrogen Peroxide @ 20 bpm, followed by 25 bbls 1% KCl Water Spacer @ 20 bpm, followed by 100 bbls 7.5% HCl @ 20 bpm, followed by 50 bbls 1% KCl/Foam Flush @ 20 bpm, followed by ~ r" ~,~ 300 bbls 1% KCI Water DiSplacement @ 20 bpm, followed by~-~"~ ~ C~.~ 1¥ ~ 12/22/92: RIH & tagged top of fill at 9470' MD. Returned well to produced water injection & obtained a valid injection rate. ARCO/~lnsk~, Inc. P.O.Box 100360 Anchorage, Alaska 995 10 DATE: 7-10-92 REFERENCE: ARCO CASED HOLE FINAL~ 2-32 ?/-/// 6-21-92 Prod Profile Run 1, 5" 3-10 ??--~/ 6-20-92 Inj Profile Run 1, 5" 3-26~3-~_?s'l 6-28-92 Prod Profile Run 1, 5" 4-14 ?~' 3~ 6-28-92 Temperature Run 1, 5" 5-5 Y~" ~/? 6-22-92 Prod Profile Run 1, 5" 7-5 6-23-92 Prod Profile Run 1, 9-38 6-30-92 Inj Profile Run 1, 5" 9-39 6-30-92 Inj Profile Run 1, 5" 12-17 ~-~ 6-29-92 Leak Detect Run 1, 5' 13-15~.l-/~' 6-27-92 Inj Profile Run 1, 5" 13-298J-~/~ 6-19-92 Prod Profile Run 1, 5" 13-32~-~/:z~ 6-27-92 Inj Profile Run 1, 5" 14-14~/o/~ 6-26-92 Inj Profile Run 1, 5" 14-36~-/~$ 6-26-92 Inj Profile Run 1, 5" 16-7 ~5'-~/ 6-19-92 Prod Profile Run 1, 5" CanlCO Camco Camco C~mco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Camco Please sign and return the attached copy as receipt of data. RECEIVED BY Have A Nice Day! Sonya Wallace ATO-1529 APPROVED_ __ Trans# 92150 # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO P,O,' BOX. tO036e .......... ".i ..... :. . --::.::_:_i :-_ ........... ~;~ ........... ..... E.C.E_IV_ED_:. · ... ............................. :L~;~:..., .......... ' JUN. 1- 1 1~91 DATE: . ' 6 t3-9t ~-~" ~ . - f~-. .- REFERENCE'. ARCO CASED HOLE FINAL~~ ~cho~ge ~i~fZ?' ' .... - t COLLAR-PERF · RUN ..... = t 3~2~ ...... 6-2-9t COLL~R-PERF~:;.LL.~ ..... ~ ............... '~.L ........ RUN-.t .--5" .,.-... . ~.. '~ ...... ' t ~f?--' 5-f 6-9t -:'~'L~:-"-' ]NJ PROF.-~ '~-.~':' ' ".'~;~--- '- RUN --t 4-2~L,-: .... 5-~ 6,9t ,-~.<=~,L-[NJ F'ROF~ ....... ~=.-. - - ': ? - ' ,- . . . .............. T~=, ........ =--. R U N -'-t .... t ~-25 5-t 6,9t :_.=.'~INJ PROF.~GR-..~ :. ;.': ' .~,~=~?- . . RUN t, 5 ._ . ........ :.s'.t ~-36 '=--~-5-t 6-9t--.~S.-tNJ PROF ~ ..... - .... . , ? . RUN---t ' ~:t5-f5' 5-t7-9t-_':~:~:~PR06 :~ROF'-.:,:~:~-:~-' ' : -~.;'-".:'"~['.::?::' . RUN .t-~ --~-t.6-~i-i-:---:---5-23-9 t-.-;-'-.~ ~[NJ--PRO~ ,~.~.;~;~:~:; ............. :. -.:-:S---: ............ RUN ~ ,---5 · . ATLAS A~LA$- CAMCO ' .CAMCO · CAMCO " ........... ~AMCO- · 'CAMCO · CAMCO " CAMCO .-/t ~~._...l_~.i 6-$~-.---.:. 5-2S-9t ;" F'ROD PROF '~.;:'"_'...'. . - ':'. ~ RUN ~ . 5 .... ::--.t 6---24 ...... 5-1 9-9t~ .... _-~.PROD ..PRO~- ,':'--:~'~ ..... i~: .... ' -' " "' ' N '.-. .-.: . . ......... -_ .--~..---.'-~:.-.-,~: .... RU .-i-, :---5 -_.-..CAMCO --. - _ .'. - -- - · ~ -_'.- _~.; ' ;;.~' _.>.~-",~,;- " . ~., , ._ ._- - . .. -' -...-.'::;~ .x. ~ - ,.. .' , . - ...-~:.:'~,~ · ' :~ ' .;- ., . .-:. :.'>;~_i 7,..~. ':-:.:--' '5-B-9t -'?:':_;"-;~,-s-:LEAK..DETE~[.~!?.-:.::~ ..--'.-_ .... . ' -. ,'::-::-':~e~.;'_'...~-;-.;..:.~RUN ..t ., :.:~ ~. ..- ..-- !: : :- ' ..-CAMCO - : '~ ~ .': - - --;:"~'---~'-'-...-' ' ':-L'~'>;?--- ..... -~,,~:~_'-:-'~-:'- 7 ': : · ' .' .... :::~;~.'.~.d~:.'~-~.: .:::.:. .- :, 's'= .'-;-'~: i'::'~'.:~'-".:'..i ': :"-," - ' . : -- - ~ ,-~ --' -' .L:~-' -' - ---:..:_' --.-¥-_.. ' - ~ ~ ':.--..?,L': ~.. ... .. -.~ ? .,)-.. · ,-:j,.~ .... ..- ·: . -- --. -- t 7---t t - 5-.-, -9t -.--.-: '. LEAK DETECt__ --.-- . ...... ~.~':~,.'- . .. RUN .~ , ,..5 .-:... ...... .-::'-,-, CAMCO .... L=..:~. ~:?.'---..t_4~-_L~5-.--I t.-~._t--~.:~-.!~PROD-. PROF.,..~-;~-'~_~_ ' L __:.-'-_!:'~:~:- ;: .... ;.' :i'i!:.'.RUN'~' ;-'= 5 "--"~'~-:'"" :"":"'-"::~CAMCO · - _~'-"-'i~:':-:----:N~I ~':7 :,,'-~"-'-:.5-t'2-9i-'--->~:i~i'"~I NJ - --"~'~-' :-' ...... ' ...... '~:~' ' PROF-~-: ?~:'~?~---';~.;'-. -'--....-." :. :' "-:,':S:~>".:?' '" ::~"RUN ~'~ :'::?, 5 · '..:~s?" :-'"'-.'~.,:JCAMCO . ~._-'W~I,5'-;.-.:.'SSt2"gt_".-'~"~.--'iNJ pF.'OF""!'!"'~'~':":__'-.;i'"'.'_.'_ i'~':.i~.'-i'~:~'-'i.." -RUN"i',;"5" >~:::i_':~':.-'i.~'!./CAbtCO'' _ .... · ' . 'i- '~ ~ . .:'.---... '. :':_~- .:.~-' F'LF_~zsE ST_GN AND RETURN THE ATTACHED COF'Y A~-: RECE~F'T OK DfiTA, . ...... . ......... · .. ~ -_ . - ' - .. . · ' ~ 5 ' . . ; : . .-.-. . RECEIVED B .'J.'H'AVE'.i~-N~ce' DAY.,._.._-~-:-i--.'.-. ;.-_~:::i_..::--_,_.-'~.-.~----:~ii~i.----.,.:---..-i"..;..' . -..:~,~-:Y. ;..' .... / '-' ..: " - ----~'.~..~---,._-:~- ..... ~'-~-__.-.:__._ '~-~;~~--;"-: '~:~' "-'~ ~-'-';-~?' .... '-' ' ' ....... _ i..i_! ....... . . .... -- -~,-..-~:.._-_ ..... . ~-_-. ---~-. -~- ..... ~---- ~?-.-i~:<.-_?_,:._-'._~:.!~r~.~,.~.,._-..._.~... :.':.-, '.,:.'i~?.~':---. '--,-'-" ' ~ ' :'.-'- ' - ' -';~.-"_'$ONYA ..-WALLACE' --: ::-"V~"::~'.-?;----:.-::'?~:.'-:::-~!~-~i~--~~!~i~/";-':;:~-i-~._ 'A~ }?.'?~!~ii~:~;'-':'?}'~i' .":::---'.-..'-i-:;.~"~-" -:" ': '. -. ~;:,-., . -~ - . ~ .,~: ...._ .. :- - .; ?:,~:::_:::::~-:~;_-.:-. ::.__.-.;-_.-~:.:-.~-?.-.-~~W~;!?;~¥.:. --,-_, :.~..- , ~.'~ .-- . ,.. ?:-~ .. .. ..,:..'..iL- ~;;.-'.:~_ ...-- .: :.. ~- .- : /, ...- . .....,;-:...,, .. ..... .-..~a t_o---~.,m-,:~ :.:-.-:: .... ,.?.~,..-..___.,>,~?~.._-.:~_:~_:.~.~:_.._?,_. _......T. rAN~~~i;i_~...,...~......,: .... , ..... ._.~....: ..... ....~ ....... --'--Y'-':':'-: -' -' ' .. i'i./' 57-'': '-ii_:i:..-::_'.' ii_ ..... - -'.'?-%~-.~-~- .'-~- ;"'-'--"'~'.. _. ........... . ....... -~}~ ..:'. .~ _ ~. ;.' .... ?._.: . ..-.-_.. · . -.. ........ .- D'I.$T-RIBUT. ION .......... ',~---.--' - ....... . _ _ - . . . ~ .. - ~. ~_.. - .-- .. -. '._ :.-. .._.~__~L___: ....... ·-. CENTRAL-F--~LE£ ...._,:~;.L.L ..... _-~. _--~. ...... . -~ ..... F.'HTLL]P$ ' -'' ' ' ' -' . --.- ...: ' .--~ CHEVRON '- -' ...... '""-':::::~' '"- P~ WELL'F~LE$ ' -- ................. ~ D & M. ' ....... R.&.D ~- EXTENSTON EXPlORaTiON ' ~ BF'X ...................... ~". ~ .EXXON ...... ' ~;-%-5---.-~- .... STATE.-OF-.~L~$KA ......................................... .. ~ MARATHON . TEXACO ' ' .... ' MOBil - ARCO ALASKA, INC~ F'.O, BOX iOOJ&f~ ANCHORAGE, ALASKA 99510 DATE' 4-27-90 REFERENCE' ARCO CASED HOLE FINALS 2-4 i0-t2-89 F'ERF RECORD RUN ~, 5' 4-4 4-J-9() PRODUCTION F'ROFILE/F'ITS RUN i, 5' 4-5 4-5-9~ PRODUCTION PROFILE/PITS RUN i, 5' 4-'~7 i2-9-89 F'ERF RECORD RUN t S' 5-i 0 i t~-i2-89 F'ERF RECORD RUN i , 5' 6-i i~-29-89 TEMF' RUN i, 5' ?-i i2-24-89 F'ERF' RECORD RUN i, 5' ?-i 4-7-9~ PRODUCTION PROFILE RUN i, 5' 7-2 4-7-90 PRODUCTION PROFILE RUN i, 5' 7-20 4-6-9r~ PRODUCTION PROFILE RUN t, 5' ?-23- i2-24-87 F'ERF RECORD RUN i, 5' 9-9 4-8-90 F'RODUCTION PROFILE RUN i, 5' t3-4 it-25-89 F'ERF RECORD RUN i, '5' t4-~56 i2-20-89 PERF RECORD RUN t, 5' i?-3 i2-8-89 COLLAR RUN i, 5' PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIP'F OF DATA. FILS CAMCO CAMCO HLS HLS HLS HLS CAMCO CAMCO CA~CO HLS CAMCO HL.S HL~ HLS RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER 'AT0-i529 t A¥ - ? 990 - ,/ Commission A F' F'R 0 V E D~ & Cons. TRANS'~ 90q 75 ~cho~e DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON' MARATHON MOBIL PHILLIPS PB WELL FILES R & D BF'X $1'ATE OF ALASKA TEXACO * THE CORRECTED API~ FOR 4-27 IS 50-~29-2i505. ARCO AL.A.?KA, INC. P.O. BOX ~0036(} ANCHORAGE, ALASKA 9954 DATE' 3-9-90 REFERENCE' ARCO PRESSURE DATA 3-4 I -6-90 BHP--STATIC GRADIENT CAMCO S-~8 t-6-90 BHP--~TATIC GRADIENT CAMCO 9-J5 4-~5-90 BHP--STATIC GRADIENT CAMCO 9-49 4-45-90 BHP--$TATIC GRADIENT CAMCO t t-4 4-5-90 BHF'--$TATIC HRS t t .-t 6 4 -5-90 BHP--$TATIC HR3' t 2-23 ~ -7-90 BHP--$TATIC HRS 42-29 4-~3-90 BHP--STATIC GRADIENT CAMCO ~ 3-32 t -7-9~ BHF'--STAT IC HR$ 44-2~ ~-3-9~ BHP--FLOWING GRADIENT CAMCO ~4-36 ~-S-90 BHP--FLOWING GRADIENT CAMCO ~6-~t ~-43-9~ BHP--STATIC GRADIENT CAMCO ~8-S ~-29-89 BHP--STATIC GRADIENT CAMCO ~8-9 ~4-:29-89 BHP--£TATIC GRADIENT CAMCO ~8-~6 ~-29-89 BHP--£TATIC GRADIENT CAMCO ~8-20 4~-29-89 BHP--STATIC GRADIENT CAMCO PLEASE SIGN RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-~ 529 AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. RE-C- 't-¥E D MAR ! 4 !990 Oil & GB.S COilS. Cottllll[~,S'tOJ~ APPROVED~___ DISTRIBUTION CENTRAL FILES ~ ~ ~'HILLIF'$ CHEVRON PB WELL F'ILES D & M ~ ~' R & D EXTENSION EXF'LORATION ~ BPX EXXON -,.~'STATE OF' ALASKA MARATHON ~ TEXACO MOBIL ARF'.'f] Ai_A,ffK A., ][ N"'" F'.. FO ~ BOX i "L':'(i:,$6,3 :'-": i'~ r' H F~ R A G E ALA~,'K A DATE:' 2-i 4-90 REFERENCE' ARCO PRESSURE DATA -i A i i -".23-89 BHF'--STATiC: ',]-i~:.ADiEN"I' :.-'--~_ i i--~E:,-89 BHF ...... ~?TA'TIC GRADZENT 3-7 i 2-4-89 BHF'--[.,'TAT]:C [;-RAD]:ENT S--f"5 i i-22;--89 BHF'--ZTATIC GR.,':~Dii'ZNT 4-2i ii-24-89 BHF ...... .ffTATIC GRADIENT ,'-_.-. ~-~--27--:.gv BH.:'F .... .'-'.-:TA'F:[C Gi~.-'.ADtENT 5-5' ~, .i, - 24- 8'.-F." _'F,' N F.. ..... $ T A T T '-'~. ,_, GRAD ]: EN T Z,-'Y 'i 2--i 6'-89 BHP--$TATiC: :SF-.'.AD:[ENi' 5-22 t2-i6-89 BHF'--Zi"ATtC GRADT_ENT 4-i S i '.2-6--89 BI4. F'--ZTATiC C-RADIENT 4-27 i2-i7-89 BHF'--$TAT!C GRADTENT 4-.3i i :'--'- ~- 8o, , BHP--$'TAT .[ F:_ -GRADIENT.:, 4-.'56 i 2"-i 6-89 BHP--,~;TATIC GI~..'Ar~IENT CAHCO CAMCO C A H C 0 CAMCO C A H C 0 C A M C 0 C A i',i C 0 C A M C Cg, MCO CAMCO CA~4CO CAMCO C A M C il) PLEASE SIGN AND RETURN THE ATTACHED REnEIVED~. BY ::.'-_.'ALLY HOFFECK ER ATO-t Z29 FEg 15 !990 Anchomg~ DISTRIBUT]:ON COF'Y AS F.'.ECEiF'T OF DATA AF'F'ROVEi) .~. .... ]'RA NS'-'~ 9 ":J":~' 6 S CENTRAL FILES CHEVRON D & M EXTENSION EXPLORaTiON EXXON . MARATHON' " MOBIL F'HILLIF'Z F'B WELL F'ILE~ OF ALASKA F,' & D Bpv .i ,,-% $'FATE T E X A C 0 ARCO A!_A£'KA... INC,. P~O, BOX i,3;3,36¢, ANCHORAGE, ALASKA 995i~-~ REFERENCE- ARCO CASED HOLE FINALZ 3-t6 i-7-9~ INJECTION PROFILE RUN 4-'~-.' f 2-28-89 INJECTION F'ROFI~ ~' ~'IIN 7-22 i-5-9~D PRODUCTION Pr.;.~OFILE RUN ~, 5.' 9-~ ~ -8-9~.D PRODUCTION PROFit_E RUN ~, .~-2~A i. - ~ i - ~,.'D,. I NJECTI,.,,~-! PROFILE RUN i 4-6 ~ -4-96, F-'TT~ Ptj~'J ~ ! .~ , ,. · . .. o~., ,i ..a.--~ ' . . .~.~ i-3-?~.-) INJECTION F'RF~FILE._ RUN i, _,- 14-36 i-5.-9¢ INJEC-FiON PROFI!_E RUN -- ~' F ,~'.uDUCT I .,. i5 i i-i¢-9¢ 'P-- ON PROFILE RUN i, ~" i8-24 !-i¢-96, PRODUCTION pROF:"rLE RUN PLEA.'.'TE .~IGN AIND RETURN'~ ATTAC'Hr-..:.'D COF'Y~ A~.--: RECEIF'T OF DATA~ HAVE A NICE SALLY HOFFE,-:KER ' B -- 9 !~s~O '..- ~TO- i DZ3'TRIBUTION APF'ROVED _~__ TRAN~ 9 ~-5 r-354 CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIF'~ ' 11" F'B WELL FILE~ R & D ~~ BF'X "' *d'TATE OF ALASKA · " TEXACO THE CORRECTED WELL NUMBER IS t3-23A, NOT i3-25, CAMCO (]AMC(] C A M C C) C A M C 0 CAMCO il'"-';. ;"' Im CA~'ICO CAMCO CAMCO UAMCt] ..--.~ STATE OF ALASKA ~-- ALASK )ILAND GAS CONSERVATION (,. '/IMISSION ~ REPORT OF SUNDRY WELL OPERATION, . i 1. Operations performed: Operation shutdown Plugging Perforate X Pull tubing ~ - Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2085' FNL, 1055' FEL Sec, 9, T10N, R14E, UM At top of productive interval 2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM At effective depth 2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM At total depth 2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 73' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-36 9. Permit number/approval number 83-163/9-1028 10. APl number 50 - 029-21039 11. Field/Pool Prudhoe Bay Oil Pool feet True vertical depth 80' 2678' 8788' 9246' Tubing Pressure 562 607 Injector . Date SUBMIT IN DUPLICATE 12. Present well condition summary Total depth: measured true vertical 9565 feet Plugs(measured) 9251 feet Effective depth: measured 9516 feet true vertical 9205 feet Junk(measured) Casing Length Size Cemented Measured depth Conductor 80' 20" 375 sx PFII 80' Surface 2605' 13-3/8" 2000 sx Fondu & 400 sx PFC 2678' Production' 8993' 9-5/8" 500 sx Class G & 300 sx CS I 9066' Liner 809' 7" 300 sx Class G 9560' Perforation depth: measured 9054-9078', 9161-9191', 9210-9240', 9250-9270', 9280-9308' true vertical 8776-8799', 8876-8904', 8921-8949', 8958-8977', 8986-9012' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713'; 4-1/2", 12.6~, L-80, PC tubing w/tail @ 8787' Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230'; Baker packer FB-1 @ 8694' 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 7261 8178 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed _.~. ~,/,,~_~__~]~ ~_,,~ ~4 ~ ~ Title Operations Engineering Manager v Form 10-404 Rev 06/15/88 DS 14-36 SAG RIVER ADD PERF PROCEDURE REPORT OF WEll OPERATIONS PROCEDURE: WORK PERFORMED 12/20/89 1. RIG UP E/L AND TEST LUBRICATOR 2. RIH WITH PERFORATING GUNS AND TIE IN TO REFERENCE LOGS 3. PERFORATE SAG INTERVAL 9056'-9080' MD (BHCS 12/31/83) TO ATTAIN 8 SPF WITH RUNS AS REQUIRED POOH. 4. RD AND RELEASE E/L. 5. RETURN WELL TO INJECTION STATUS STATE OF ALASKA ~ ~- -,) ALASK,~'"~'IL AND GAS CONSERVATION C,_ JMISSI(DN~ ~- ~ APPLIC ,'ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approv'~ program ~ull tubing Vadance Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM At effective depth 2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM At total depth 2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM 6. Datum of elevation(DF or KB) RKB 73' 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-36 9. Permit number 83-163 10. APl number 50 - 029-21039 11. Field/Pool Pru, dh9_e ,.B. ay..O!1 po_o! ~-:. 12. Present well condition summary ._~ ,, .... . Total depth: measured 9565 feet Plugs(measured) true vertical 9251 feet Effective depth: measured 9516 feet true vertical 9205 feet Junk(measured) Casing Length Size Cemented Measured depth' True vertical depth Conductor 80' 20" 375 Sx PFII 80' 80' Su dace 2605' 13-3/8" 2000 Sx Fondu & 400 Sx PFC 2678' 2678' Production 8993' 9-5/8" 500 Sx Class G & 300 Sx CS 1 9066' 8788' Liner 809' 7" 300 Sx Class G 8751-9560' 8493-9246' feet Perforation depth: measured 9161-9161'; 9210-9240'; 9250-9270'; 9280-9308' true vertical 8876-8904'; 8921-8949'; 8958-8977'; 8986-9012' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713'; 4-1/2", 12.6#, L-80, PC tubing w/tail @ 8787' Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230'; Baker Packer FB-1 @ 8694' 13. AttaChments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation December 1989 16. If proposal was verbally approved Oil x Gas Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. / Signed ~~7~.~.~ ~ "~~¢,2' Title Operations Engineering Manager FOR COMMIRRION H~E ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~ Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH 15. Status of well classification as: Suspended Date 2,7~.~¢' ~' I Approval No.F~ ~kpproved CoPY Returned Commissioner Date //-~'~:~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE PROPOSED PERFORATING DS 14-36 ARCO Alaska proposes to add perforations in the DS 14-36 Injector in the Sag River formation of the Prudhoe Bay Unit. All wire line work will be done through 5000 PSI working pressure BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The purpose of the proposed perforating will be to provide effective drainage of the Sag River reserves. Ref: BHCS 12/31/83 Proposed Perforation Interval' 9056-9080' MD 1. 5000 PSI 7" WELLHEAD CONNE:CTOR FLANGE 2. 5000 PSI WIRE:LINE RAMS (VARIABLE SIZE:) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSi 4 1/6" FLOW TUBE PACK-OFF N I REL I NE BOP EGU,I pHENT ARC(] ALASKA, INC. F'.O, BOX 'i00360 ANCHORAGE, ALASKA 995J0 DATE' 8-29-89 REFERENCE' ARCO PRESSURE DATA S-t 5 7-27-89 BHF'--5'TATIC GRADIENT CAMCO 3-33 7-t4-89 BHF'--£TATIC GRADIENT CAMCO 4-2 7-8-89 BHP--$TATIC GRADIENT (W/ATTACH.) CAMCO 7-5 7-~9-89 BHF'--£TATIC GRADIENT CAMCO 7-7A 7-S~ -89 BHF'--PBU HRS' 7-8 7-29-89 BHP--$TA'I'I C GRADIENT CAMCO 7-t ¢., 8-5-89 BHF'--S'TATIC GRADIENT CAMCO 7-~ 4 7-29-89 BHP--F'BU HR$ 7-27 7-2~;-89 BHP--$TATIC GRADIENT CAMCO 7-33 7-23-89 BHP--£'I'AT I C GRADIENT CAMCO 9-24 7/t4-t5/89 BHF'--S'TATIC GRADIENT CAMCO 9-38 8-~2-89 BHF'--$TATIC GRADIENT CAMCO ~t-:2 7-7-89 BHP--$TATIC GRADIENT HRS' t~-7 7-9-89 BHP--$TATIC GRADIENT HR$ ~t-i6 7-~0-89 BHP--$TA'[IC GRADIENT HR~~ ~-~7 8-~-89 BHP--FLOWING GRADIENT CAMCO ~ 2-30 7-:23-89 BHP--$TATIC GRADIENT CAMCO ~4"'t9 8-~0-89 BHP--$TATIC GRADIENT CAMCO ~4-22 8-t7-89 BHF'--$TATIC GRADIENT CAMCO ~ 4-36 7-29-89 BHF'--FLOWING GRADIENT CAMCO ~4-39 8-~S-89 BHP--S'TATIC GRADIENT CAMCO ~5-~ T-2~-89 BHF'--$TATIC GRADIENT CAMCO ~ 6'-i 2~ 7-26-89 BHF'--~'TATIC GRADIENT CAMCO ~ 6-2~) 7'-t S-89 BHP--£TATIC GRADIENT CAMCO ~8-25 7-~S-89 BHP--$TATIC GRADIENT CAMCO PLEASE £IGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. DISTRIBUTION AF.F. ROVED-~J-~ TRAN$:~ 89363 CENTRAL FILES CHEVRON "' D & M EXTENSION EXPLORAI'ION ~ EXXON HARATHON /2.. - ~ MOBIL ~ PHILLIPS F'B WELL F'ILES' · "' R & D · "-,- BPX ~ STATE OF ALASKA · "~ TEXACO ARCO ALASKA, INC. P.O. BOX t0~36(} ANCHORAGE, ALA~'K A 995i ~3 DATE- 8-tl-89 REFERENCE: 7-t2 7-23 9-8 I2-3 t2-7A t 4-36 t5-tt t7-8 PLEASE ARCO CASED HOLE FINAL~ 7-29-89 7-28-89 7-3~-89 7-26-89 8-4-89 8-4-89 7-29-89 7-3i-89 ?-2?-89 F'RODUCTION F'ROFILE PRODUCTION F'ROFILE F'RODLJCTION PROFILE INJECTION PROFILE F'ERF RECORD PERF RECORD INJECTION PROFILE PRODUCTION PROFILE INJECTION F'ROFILE N AND RETURN THE ATTACHED COPY AS RECEIPT OF RUN RUN RUN RUN RUN RUN RUN RUN RUN DATA. DISTRIBUTION CENTRAL FILE£ ~ PHILLIPS CHEVRON PB WELL FILES D & M R & D EXTENSION EXPLORATION ~ BF'X EXXON ~ STATE OF ALASKA MARATHON ~ TEXACO MOBIL · 5' 5' 5' 5' 5' 5' CAMCO CAMCO CAMCO CAMCO ~CH $CH CAMCO CAMCO CAMCO ~, STATE OF ALASKA ~,i~..- j ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETIOI'I OR RECOMPLETION REPORT Al,ID LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE I~1 WATER INJECTOR 2. Name of Operator 7. Permit Number ARCO A1 aska, I nc. 8:3-1 3. Address 8. APl Number P. 0. Box 100360~ Anchorage, AK 99510 50- 029-210_~9 4. Location of well at surface 9. Unit or Lease Name 2085' FNL, 1055' FEL, Sec.9, T10N, R14E, UM Pr. udhoe Bav Unit At Top Producing Interval 10. Well Number 2647' FNL, 2601' FEL, Sec.9, T10N, R14E, UM 14--~; At Total Depth 11. Field and Pool · 2621' FNL~ 25:30' FWL, Se¢.9, T10N, R14E, UM - Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 7:3' I ADL 28:~12 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 12/20/83 1 2/30/83 01/10/84*I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey [ 20. Depth where SSSV set 21. Thickness of Permafrost 9565'MD/9251 'TVD 9516'MD/9205'TVD YES [~ NO []I 2230 feet MD lqnN' (Annrn~ 22. Type..IElectric or Other Logs Run D I L/BHCS/SP/GR. LDT/CNL/Cal/GR. CBL; Gyro 23. CASING, LINER AND CEMENTING RECORD , , SETTING DEPTH MD CASING SIZE WT. PER FT. i GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20t' 91 .~# H-40 Surf -R0' 30" 375 sx PF I I 13-3/8" 77.N# I-RN .c;,,rf 9~,?R' 17-1/91, 9~Bn ~v l~,~n4,, ~ /~nn .~ E,~ r '9-~._/.Fl" - b. 7:0# I-RN Surf 9066' 12-!/~.'' 500 :x Clasc n ,_ ~n0 s~ CS I . 7'" ' .... 29.0# L-BO FlT~,1' 95¢,N' 8-1/~" ~n0 ~ Class G . 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBIN~ RECORD interval, size and number) Perforated w/4 spf SIZE DEPTH SET (MD) PACKER SET (MD) 5~2/4½" 8787 ' 8694 ' 9161 ' -9191 ' MD/8876 ' -8904 ' TVD 9210 ' -9240 'MD/8921 ' -8949 'TVD 26. ACID, FRACTURE, CEMENT SOU E'EZE, ETC. , 9250'-9270'MD/8958'-8977'TVD DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9280 ' -9:308 'MD/8986 ' -901 2 'TVD N/A " ' , 27. PRODUCTION TEST , ,, Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Date of'T~st Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE l GAS-OIL RATIO TEST PERIOD I~ 1 , , Flow Tubing Casing Pressure CALCULATED OI L-BBL GAs-McF WATER-BBL OIL GR~V'ITY-API' (corr) Press. 24-HOUR RATE ~ 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. * NOTE: Perforated well 8/26/84. Workover performed 6/16/88. A~:~,,.~, ,'~j; -- Form 10-407 (Dani) WC5/025 Submit in duplicatel~~. Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. GEoLoGIc MARKERS. " .' ~ ~ i: ~' ' ':~ _' .~': i ';'~ '" ~ · '', ';' .- NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAs. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit ' 9158t 88~3t None 0WC 9:392 Base Sad]erochit Not. Reached i ., . · ~ . -. 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed //~~~~l'~L~ Title ^Ssoc, a~;e 'Encj, neet' Date ~/'~)/~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM~oSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Alter Casing ~.' Other 2. Name of Operator ARCO Alaska, inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 2085' FNL, 1055' FEL, Sec.9, TION, R14E, UM At top of productive interval 2647' FNL, 2600' FEL, Sec.9, TION, R14E, UM At effective depth 2624' FNL, 2548' FWL, Sec.9, TION, R14E, UM At total depth 2621' FNL, 2530' FWL, Sec.9, TION, R14E, UM 11. Present well Condition summary Total depth: measured true vertical 12. 9565 ' MD 9251 ' TVD 13. Effective depth: measured 9516'MD true vertical 9205'TVD Stimulate [] Plugging ~ Perforate ~ Pull tubing,l~ WORKOVER Casing Length Conductor 80' Surface 2649' Production 9040, Liner 809' 5. Datum elevation (DF or KB) RKB 73' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 14-36 8. Approval number 8-377 9. APl number 50-- 029-21039 10. Pool Prudhoe Bay Oil Pool feet Plugs (measured) None feet Perforation depth: measured Feet feet Junk (measured) None feet Size Cemented Measured depth 20" 1965 # Poleset 80'MD 13-3/8" 2000 sx.Fondu & 2678'MD 400 sx PFC 9-5/8" 500 sx Class G & 9066'MD 300 sx CS I 7" 300 sx Class G 8751'-9560'MD 9161 '-9191', 9210'-9240', 9250'-9270', 9280'-9308' true vertical Tubing (size, grade and measured depth) 5½"/4½", L-80, tbg w/tail @ '8787' Packers and SSSV (type and measured depth) FB-1 pkr ~ 8694' & Bal-0 SSSV (~ 2230' Stimulation or cement squeeze summary N/A Intervals treated (measured) ~ue Vertical depth 80'TVD 2678'TVD 8788'TVD 8493'-9246'TVD 8876'-8904', 8921 '-8949', 8958'-8977', 8986'-9012' Treatment description including volumes used and final pressure N/A Prior to well operation Subsequent to operation Representative Daily Average Production or In(ech°n~0'atasCasing pre Oil-Bbl Gas-Mcf Water-Bbl suCe' d '¥~¢blng Pres 14. Attachments (Workover Wel 1 History) Daily Report of Well Operations ~] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~) ~/)(.~/ .~/J~L ~L ~/ Title Form 10-404 Rev. 12-1-85 ~ Asso¢i ate Engi neet (Dani) SW03/009 Date Submit in Duplicate ARCO Oil and Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started, Daily work prior to spudding should be summarized on the form giving inclusive dates only. District kRCO ~LAS~ INC. Field PRUDHOE BAY FIELD Auth. or W.O. no. AS2262 ICounty, parish or borough NORTH SLOPE Lease or Unit ADL: 28312 Title WORKOVER Lst.j~ J Well no. DS 14-3~ API: 50-029-21039 Date Operator ARCO Spudded or W.O. begun ~CCEPT Date and depth ss of 8:00 a.m. 06/11/88 ( TD: 9565 PB: 9516 SUPV:RO 06/12/88 ( TD: 9565 PB: 9516 SUPV:RO 06/13/88 ( TD: 9565 PB: 9516 SUPV:RO 06/14/88 ( TD: 9565 PB: 9516 SUPV:RO 06/15/88 ( TD: 956E PB: 9516 SUPV:RO 06/16/88 ( TD: 9565 PB: 9516 SUPV:TJ Complete record for each day reported WESTWARD RIG 1 06/10/88 IHour HRS 2000 IARCO W.I. 22.0000 Prior status if a W.O. NU BOPE 7"@ 9560' MW: 8.5 SEAWATER MOVE RIG F/ DS 13-34 TO DS 14-36. RU ON 14-36. ACCEPTED RIG _ AT 2000 HRS 6/10/88. KILL WELL. BULLHEAD DOWN TBG AND ANN. WELL ON VACU~ SET BPV. ND TREE AND NU BOPE. TEST SAME. ND BOPE. LEAK BETWEEN TBG SPOOL AND BOPE. DAILY:S31,350 CUM:$31,350 ETD:S31,350 EFC:$468,000 TIH 7"@ 9560' MW: 8.5 SEAWATER TEST BOPE. PULL HGR TO FLOOR. OBSERVE WELL. PUMP HEC PILL (100 BBLS). OBSERVE WELL. POOH-LD 5-1/2" TBG. RU AND PU BHA AND RIH. DAILY:S27,906 CUM:$59,256 ETD:S59,256 EFC:$468,000 POOH 7"@ 9560' MW: 8.5 SEAWATER FIN TIH TO RETRIEVE PKR. CDL. FIN TIH. LATCH UP ON PBR. WORK PKR LOOSE. POOH W/ FISH. PKR DRAGGING AND SWABBING. LD PBR, PKR AND 2 JTS OF DP. MU BHA AND RIH. TAG LINER AT 9048'. POOH. . DAILY:S27,906 CUM:$87,162 ETD:S87,162 EFC:$468,000 CIRC BTMS UP 7"@ 9560' MW: 8.5 SEAWATER POOH LD BHA. MU 9-5/8" RTTS AND RIH TO 8730'. SET RTTS. TEST CSG TO 3000 PSI (30 MINS). POOH W/ RTTS. MU BIT AND . BHA AND RIH. SLIP DRL LINE. TIH TO 9503'. CIRC BTM~UP THROUGH CHOKE DUE TO GAS AND C-193 IN SEAWATER. DAILY:S44,430 CUM:$131,592 ETD:S131,592 EFC:$468,000 LD 3-1/2" DP 7"@ 9560' MW: 8.5 SEAWATER CIRC BTMS UP. PUMP HEC PILL AND CIRC CLEAN SEAWATER. POOH. LD BHA. RU DRESSER AND RIH W/ 8.5" GR/JB TO TOL. RD DRESSER. MU BAKER PKR AND TAILPIPE AND TIH ON DP. SET PKR AT 8680'. PRESS TEST PKR AND CSG TO 3000 PSI. POOH LD 3-1/2" DP. DAILY:S40,552 CUM:$172,144 ETD:S172,144 EFC:$468,000 CHNG RAMS 7"@ 9560' MW: 8.5 SEAWATER POOH. LD DP. PULL WB. RU AND RIH W/ 5-1/2" COMPLETION. TEST SSSV TO 5000 PSI. CONTINUE RIH. STAB INTO PKR-VERIFY W/ 500 PSI. SPACE OUT AND LAND TBG. CAN NOT GET TEST ON TBG HANGER. CHANGING RAMS. DAILY:S75,722 CUM:$247,866 ETD:S247,866 EFC:$468,000 The above is correct Signature For form prepar~on and distribution, see Procedures llyl_anual, Section 10, Drilling, Pages I~ -and 87. Date [ Title ASSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. J Accounting cost center code District I Stal~[K ARCO ALASKA INC. Field ICounty or Parish NORTH SLOPE Lease or Unit ADT,: 28312 Title WORKOVER Well no. DS 14-~6 PRUD}{OE BAY FIELD Auth. or W.O. no. AS2262 Operator I A.R.Co. W.I. ARCO 22. 0000 Spudded or W.O. begun I Date ACCEPT I 06/10/88 Complete record for each day reported WESTWARD RIG 1 50-029-21039 I otal number of wells (active or inactive) on this ost center prior to plugging and ~ bandonment of this well J our ~ Prior status if a W.O. 2000 HRS Date and depth as of 8:00 a.m. 06/17/88 ( TD: 9565 PB: 9516 SUPV:TJ RIG RELEASED 7"@ 9560' MW: 6.9 DIESEL RIH. LAND TBG. TEST TBG AND ANN W/ 3000 AND 2500 PSI. SET BPV. ND BOPE. NU TREE. TEST TO 5000 PSI. SHEAR OUT SOS AT 3900 PSI. SECURE WELL. RELEASE RIG AT 2000 HRS, 6/16/88. DAILY:S46,905 CUM:$294,771 ETD:S294,771 EFC:$468,000 Old TD New TD Released rig Date IPB Depth Kind of rig Classifications (oil, gas, etc.) Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size. SPM X length Choke size T,P. C.P. Water % GOR , Gravity Allowable Effective date ! corrected The above is correct Signature ~ For form pr,~rarati,on and distribution, see Proced~s Manual, Section 10, Drilling, Pages 86 and 87. IDate JTitle A,~5OOIATE ENGINEER ,.d ; .......... ,~:~-. ..... ~r. Cons. Commission .~n¢ora~e STATE OF ALASKA '~-" ALASI,,.. OIL AND GAS CONSERVATION COMM.,.,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing ~ Time extension ~ Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~. Amend order ~ Perforate ~ Other"~,,, 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. RKB 73' feet 3. Address 6. Unit or Property name P. 0. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit 7. Well number 14-36 4. Location 2085 ' At top of 2647 ' At effective depth 2624' FNL, 2548' At total depth 2621 ' FNL, 2530' of well at surface FNL, 1055' FEL, Sec. 9, TION, R14E, UM productive interval FNL, 2600' FEL, Sec. 9, TION, R14E, UM FWL, Sec. 9, TION, R14E, UM 8. Permit number 83-163 9. APl number 50--029-21 039 10. Pool FWL, Sec. 9, TION, R14E, UM Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 9565'MD 9251'TVD feet Plugs (measured) N o n e feet Effective depth: measured 951 6 ' MD feet Junk (measured) None true vertical 9205 ' TVD feet Casing Conductor Surface Length Size Cemented Measured depth ~ue Verticaldepth 80' 20" 1965# Poleset 80'HD 80'TVD 2649' 13-3/8" 2000 sx Fondu & 2678'HD 2678'TVD 400 sx PFC 9040' 9-5/8" 500 sx Class G & 9066'MD 8788'TVD 300 sx CS I 7" 300 sx Class G Production Liner 809' Perforation depth: measured 8751 '- 8493'- 9560' MD 9246' TVD 91 61 '-9191 ', 9210'-9240' 9250'-9270', 9280'-9308' , . . true vertical 8876 '-8904~ , 8921'-8949', 8958'-8977,, 8986'-9012' Tubing (size, grade and measured depth) 5½" 17 O# L-80 tubing with tail ~ 8780' Packers and SSSV (type and measured depth) Baker FHL packer @ 8691', Camco Bal-O SSSV ¢ 2097' 12.Attachments Description summary of proposal ~L .. Detailed operations program 13. Estimated date for commencing operation Au~lust 15~ 1988 14. If proposal was verballY approved Name of approver ,-~ ~r,~w~ ~d- ¢7/(~//~_~ '~_~__~_ Date approved _ . 15. I hereby certify that the foregoing is true and correct t(~ the best of my knowledge Signed ~j~~q~ ~t,~~ Title Associate Engineer Commission Use Only (.76) SA3:98 Conditions of approval Notify commission so representative may witness I Approval No. ~,~ -~ ? ~ Plug integrity [] BOP Test [] Location clearanceI (,.-J -" Returned _ -o Approved by _ , _ ~ ~-c, mmi-_~;~inn~.~ Form 10-403 Rev 12-1-85 Date by order of the commission Date S~,~bmit/in triplicate P'-i APPLICATION FOR SUNDRY APPROVALS DS 14-36 (WAG) WORKOVER PROCEDURE SUMMARY OBJECTIVE: Retrieve existing 5-1/2" completion assembly and replace with new plastic coated 5-1/2" tubing and permanent packer. Well will be cleaned out to PBTD. 1) MIRU WW1. ND tree. NU BOPE and test. 2) Pull BPV. Check well for flow. 3) POOH w/5-1/2" tubing and seal assembly. 4) RIH w/3-1/2" DP and PBR retrieving tool. 5) Engage PBR and release packer. POOH w/packer and PBR. 6) RIH w/test packer and test 9-5/8" casing to 2500 psi. Test 9-5/8" packoff to 3500 psi. 7) POOH. MU new 9-5/8" permanent packer on DP and RIH and set same. POOH, LDDP. 8) RIH w/new 5-1/2" completion assembly. 9) Land tubing. Set BPV. ND BOPE. NU 5-1/2" 5M tree and test. Test tubing and annulus to 3000 psi and 3500 psi, respectively. 10) Release rig. Turn well over to Production. BHP: 3750 psi @ 8800'TVD (8.4 ppg) Workover fluid: 8.5 ppg seawater DCS/29b 5/4/88 ANNULAR PREVENTER § ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS $000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. I I TUBIN6 HEAD 1. 13-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4. 13-5/8" - 5000 PSI BLIND RAMS 5. 13-5/8" - 5000 PS! PIPE RAMS 6. 13-5/8" - 5000 PSI ANNULAR BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. O. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12, TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. JG NOVEMBER 21, 1986 ARCO A!_.A,?KA: IN.r.'.,. .i::,., l."l.., BOX ANCI-IC!RAG[.:., ALA,?K A .: . DATF..' 4-7-88 --... I.~'E'F.'ERE"_i',~CE-.' ARCO CAS'ED I--lf'.ll..F.~ I::' Il NA!.. P R' O D I I C 1' .1:. I') N I::' R f') I'-" :[ I.. I:.' P r.;.' 0 D ! I (:.'. T T 0 N F' IR' F! F T !.. F F' F: ['l l) ! ! F..'. 1' '!: F) N F:' R'. ri I::' ]: I.. F:' F'RI]!/!.IF:T T fin F'K'FIF !: I..F e !'? [:'.! D I !f':: T T_ I'] N !::' f;.' F.! !:: T. !.. !!.'. T N. I E [.'. T T !1N F' F..' !'.! F' T I.. I:!' F' R fi !) I.! f] T T. C) t'-J r.:, f;: f') F.:' !: !.. F!: F:' F.' f:l ~') ! .I f't T T 0 H F' F..' f'! F T [ I--. !_ IE A N r~ F.::'T' E F..'.".l" T f'~ N ]' N. t [.: It. 1' 1' Il FJ F' F;.' O F' T I. I::' !::' I:;.' 01) ,. F:' !:;~'1:'1.. [!:-.-. f.'; ['~' / T E N P / I,I A T I![ R' HI.. I) U I::' PI..EA,.%[? ,.'c.,']:.C-N AN]) F:E:'I'!!F.'K~ 'f'!'~[." A'I'TAF:HE:!) C?I:'Y A,.? !:;.'_F['.'F']'PT R El [ ^PR ! ] HAVE A NICE DAY! Alaska 0il & 6as Oons. Commissior~ F' F:: 6 f'..; Y f.:{ E N N E:'T' T Anchorage A'T' !'i ~ r"" '? o .... ~ _..~ ~... · ¥) T :':'. 'f' R T 'R I 11' T (i I:;'1 IN I~'! IN RI.IN I~'!.IN ~R'I !N RIIN I:;.'. I.I N RI. IN R'! IN !~'1 lt'-J I:;.'I.IN 5" 5" 5" 5" !:.~ . n;" I".A MFtI:! (':AMf'tFI P. AMf:I1 I:: A M F'. f': A id f': f'! EAM¢.I'I I':AMCO f": ~ H fi II ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 1, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 Subject: DS# 14-36 Permit No. 83-163 Dear Mr. Chatterton: Attached is the Application for Sundry Approval as required per Rule 7 of Area Injection Order No. 4 for the above referenced well. Very truly yours, D. F. Scheve DFS:HGL Attachment Standard Alaska Production Co. M. L. Bill, ATO 1550 L. L. Gantt, ATO 1520 P.-S. Pierce/E. W. Skaalure, PRB20 T. G. Zibell/J. D. Ottoson, PRB 24 PRB Files (14-36) Oper. Eng. Files (14-36) ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALAS,.., OIL AND GAS CONSERVATION COMN,,,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 73' RKB feet 3. Address 6. Unit or Property name P. O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2647' FNL, 2601' FWL, Sec. 9, T10N, R14E, UM At effective depth At tot, al depth 2621 FNL, 2530' FWL, Sec. 9, T10N, R14E, UM 7. Well number DS 14-36 8. Permit number 83-163 9. APl number 50-- 029-21 039 10. Pool Sadlerochit 11. Present well condition summary Total depth: measured 9565 feet true vertical 9251 feet Effective depth: measured 9516 feet true vertical 9205 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size 80' 20" 2678' 13-3/8" Plugs (measured) Junk (measured) Cemented 375 sx Permafrost II 2000 sx Fondu/400 sx PF "C' None Alaska Oil & Gas Cons. Commissio Anchorage Measured depth True Vertical depth 80' 80' 2678' 2678' 9066' 9-5/8" 500 sx Cl "G"/300 sx CS1 9066' 839' 7" 300 sx cl "G" 8271 '-9560' 8787' 8464'-9246' measured 9161'-9191' MD; 9210'-9240' MD; 9250'-9270' MD; 9280'-9308' MD true vertical 8876'-8903' TVD; 8921'-8949' TVD; 8958'-8977' TVD; 8986'-9012' TVD Tubing (size, grade and measured depth) 5-1/2", 17#, L-80, 0-8685' MD (Plastic Coated) 4-1/2", 12.6#, L-80, 8685'-8780' MD (Plastic Coated) Packers and SSSV (type and measured depth) Baker FHL Packer @ 8691' Camco BaI-O SSSV Nipple @ 2096' 12.Attachments Description summary of proposal J~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation N/A 14. If proposal was verbally approved Mike Minder Name of approver Date approved 3/29/88 15. I hereby/certify th,at the foregoing is true and correct to the best of my knowledge Signed Date ¢~'/o¢"~'' Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. ~ ~,~.- .L~Z_~"~_e~hanJcal [] Plug integr!~y [] BOP Test [] Location clearanceI Integrity Te~JJ It is approved to cont~inue ~ater injection tillworkover operations commence this fall. ~pproved Copy Returr),eC¢ by order of Approved by ORIGINAL SIGNED BY --~/--~/-~(~mmissioner the commission Date Form 10-403 Rev 12-1-L~NNtE C. SMITH Submit in triplicat INJECTION WELL ANNULAR COMMUNICATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: TIME: NOTIFIED BY: REASON: 3-29-88 0915 hrs Pam Pierce AOGCC CONTACT: Mike Minder Injection Well 14-36 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 DISCUSSION: On 3-28-88 a CCL Icg identified the Baker FHL packer had failed and fell 28' downhole to the liner top. Temperature/Spinner logs were inconclusive. No signs of 9-5/8" x 13-3/8" communication were evidenced during the logging operation. ARCO recommendation is to place the well on water injection only until a workover can be scheduled. AOGCC RESPONSE: OK to resume water injection on temporary basis (_+ one week). Sundry Notice is required with approval for long term water injection until a workover can be planned. Sundry Notice Req'd at this time? YES X NO SIGNED: PRODUCTION SUPPORT SUPERINTENDENT Original to G. D. Herring/H. G. Limb - PRB #24 Production Support Superintendent (P. Pierce/E. W. Skaalure) - PRB #20 Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB #20 Field Area Operations Engineer (J. D. Ottoson/T. G. Zibell) - PRB #24 DS Supervisor - FS #3 FS Superintendent - FS #3 DS Engineer- ATO 1552 (M. R. Cook) R [CE~V iD .. Alaska Oil & G~s Cons. ,.,on,~,~ ....... ~.. Anchora~ AFi'f.']O AI.A:.?I(A, TNF:, ¢.i : R.I::'F:'IiilF~IENC[il · ARC:O I"'.'A,,) I::"T.') Uf..'llllF. I::' ]' NAI. F" I;;.l {') T) I J C T ;1' 0 Ig H I::' I::' M / 'f' F.!'M I::' H 1 S' C ;I; B I_. I!!; ('..; A,.'¢ I N, I / F:' Fi' 0 F:' ]' I. F:' I:i'. I!:; C.: IE ]' ",/1.7:; l) B Y ll"l A \,"[':; A N I C E .l.~ A Y ! D! ,5.,' T R T BI. IT C A H f': r'l .,-fi,: C':E'NTI:;.'.AI. F:']'!. Ii!;,'.';' · "'.,,. C !"1F'V... I;: f'il N l) * H · '" _.F. X '}" E N..":,' .T R N F;.Y, r-:'l.. OR A'r T riN HARA'f'HF..IN ~'! 0 B I L. Pll-! T I...ll.. :r p s F:' ~'{ L~ [:' I. Il. F ;1' I... IF. ~': R k .r~ ~: E ,$;I'ATF' OF' AI..A,~'ICA 4[: ~Jas_k,~ Oil & .Gas Cons. Com$[s_s_[qtl ARCO ALto.si(m, Inc. P,O, Box i00~6r~ Anchorage, ALm.ska 99.51 (~ DATE: i (')-t 2-87 REFEF~ENCE: ARCO Cased Ho I.e F:'ir, a t t4-~6 9-26-87 Inject ion F'rofi L~, Run t , 5" PLease ~ign and re~u~e of Received By_ 0 Gas Cons. C0mmiss[0~ l--IA V E: A N I C E AlaSk~ Oi~ & ~C~OT~B Recor d.~ F'r oce~.~or ATO--t 52~ da$.a, TRANS ~875S~ Approved DISTRIBUTION C 8 fll ~ 0 Cen!raL Fi [e~ ~ Phi l[ip.~ Chevron PB WeL£ Fi Les D & M R & I) Extension E×p loraf ion ~ SAF'C ~ S+a~e of ALaska E x x o ii ~ . Marathon ~ ~ Texmco Mob ~ t . o- ~ -~-'J:~-t:-:O 2T.'~:- , r'_.~ 'i['~.'.'-'~F':. Lo'g R:u"---'. ": ,:.._ c~ ,./., ,_, ~.:--~ ---S.!- .iff~ in ~ ~tu':..-v ~ ir.-_; _. F"r'c.','f ~ ,P,~n..._ "i ?- 'i 2 ~/ ~ - 2-- :-'-< 6 i :-:-- _.-; ,:-:c, c t; ,::: 'r., P r- c-- f ~. L e -'--: --:., '..-,. ': i i i -_-? ~. z._.q..z. ~ ~' R ': 5 ' '=: :."-~ 'z'"/ S-'7-F:6 .~ ,: iec. ,-. ~ :_-,:,'::. ..... r'ro{'i [e R,'..~'..:': ".. ... ...... .-- ~ ? · - .--. - · , ,--~ .. : .-._, 3---~--~i~: :.R iCrCT. ~C:,.i P'i-C,'-- ~ ;_~ ?'-..Ui'i 'i i ~--'-? ,/ 5: -- C--'-'F~ 6 ]:-.,_~ec~ i.-::,'.,", "'..-:' ? c f Z [ e F: ,..~ ',-., · 'i3-i8/ ~::--9-86 Z'~-:]ect ~o'n fi"rofi ::_c-. F:,'_'..'.,-~ ~ ~"---"-~'/-.. : Y-i--:_--:,-86 ~'~-.: ~E,,._-~ ~-:::,'r'~ i'--::'.,-c,-..:i ~_:.:_ $.'u'n i 4-'---'S/ ~:-"::"-.'-'q?. :-:F' ~n. Lc.-,-] Z'.,"~] _...."-':",.-of~ Run i i ~-27d' S--¥-~:A 2-~-~ ~ "~'r,e'_,- ."-.Tu',- ¥~:.-,. Run i _~-~'' i4-36/ ~-A-F.:A .i'-:-~ i---.--_-':c± i c,'r.: P':.-o~ } [e Run i6-ii¥ S--iA-?-6 l-r~iection F'rot~ :e Run "- 5' i6-i6'/ 12 ~ ,- _o:- -: ..... r~ ..... -.~o :_,=- ...... Lag. L.'-~'----vices ~... .... i il. -Z. fO C: C..' ;.;a h'lC O L, a [,'i "Z: C: ,.-. L- ..-ii iii C C, {.: .e ~, ,:: ': ~.]: a ;~'~ ..T. ,:3 '-i.1 -=': ~'i~ ,i (;~ C a ~iC 0 0 ± i _--. CamEo Ca ~r~c o Pi.e..-:~se si.~'._<, a;-..d :-e+u}.-:.,-~ +h~ :':-::'{acv. E-d copy as- ?.-~cei[:"? of data. / JUN 0 1986 ~..: H__~ ~...--. ~ ~ 0il & Gas Cons_ Co Pl.'aC E 'T T; .~';":. ARCO Alaska, Inc~ Post Office =Ox 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 Date: Reference: January 29, 1985 ARCO Pressure Data / 3-11wPressure Survey --tl-7 Static-Gradient 14-25~/Pressure Fall Out ~¥1~6!~essure Fall Out 14-26~Pressure Build-up 11-3-84 GO 1-11-85 Camco 1-7-85 Camco 1-7-85 Camco 11-16/17-84 Camco n and return the attached copy as recipt of data. Pam Lambert ATO 1429C Anchora~je Trans 014 Chevron D & M Exploration Services Extension Exploration Texaco Marathon Mobile M~bile E & P Phillips Prudhoe Bay Well Files R & D Sohio State of Alaska ARCO ALasl<a: .Thc P.O.. 'c, .. ,..,o.,, i 00360 Anchorage: A L ~ _.--: i-.': a 9'.: _:- i 0 ¥)ATF-.'- I)F. cembei" 24 : i oc.-..,,, REF'r:~RENCE- ARCO Cased HoLe F in@Ls D.S, S-4J. Ii-7-84 D ,. :'-"::-. ,. -~-'I'':;/~ ..... ~.: -._. I I '- I --~-.~'"i D,S,. '~-" ~ '' ,.., '~i '~'~ 3.-84 D ;? S-12 i i _.,-:, _ c:, ,-, ~'.', S S- t "'" ' -2--84 .... .. 'Ii D,.,S'..~ .'5-'J3 i i--'~--,:::,.~¥ O.$'. '"-;--l"'" I I -'] ,-, ,-.,-,' : ' ")_.; '")- 0 /~ D., ..c..,, 9_.j,,/ -~ .-_ ~ ....... I) %' c:.- ',>" ' ' '"' ....... ~: /- I ",-"~ D, ..,...,, 9-'4-"-- i i - i 8-84 I) v' 9 - '~.'--'"" ' '~-c)-84 · . ~. ~.:- ~. . .. I ~'.. D. S.'. o_~..'.-.. ~ / i ! -! 9-84 D ~" 9-6':' , ,-.,_' -~_.c:, ..~. I .-. 1--. o_.-., u I 2-' I ;"' 84 t').S .... , ~.- D e o_., c.-._,./ · ' O-8 ~,:, ,- ~,.' ~2 .... i 4 D y t3-24,--'; i 2 D :";' i :5-'32 i 2-5-°'''' '~ · · · .-.~ r--., .'-- ,. D, Y, i 4-~..:- i 2--6-~"~ D ~:; 14-'') '-' ~''' . ,, i 2-6-o/` .~ ,~ . I_: ~¥ D,. S ,. I 4-~:~:?" i 2-6-84 D, ~., i~.;- i i -- ,'~ ~.ease sign and return CFS/£'p inner Ru'.n i C F,~,,'",,~ p i nr~er l)-i f f T e m [.:, L o g I::..' u.'n i Dif'F Temp F,'u.n I CFS/Sp inner I:;.'. u'.r~ . i CFS,/~p inner Run t :~1 ...:; ..:., ..../- ., r- -. [,rx/ VIc:. ,. ,?p i nne'F Log F;tun c.~-.i :~'..- ..'r'c, F:.'.~n i CN/ifiS-./GR Ru.n SP inner Log Ru.'i"~ i i'" :: i ," ~4 .'" ,_.In,,,.,, GF: Ru'n 'i Ypi'nner l_og !:;,"u.r~ i ~.'nj ~' Pr of i Le/c:~'p i r~'ner R,,r,_. i :'-; .... p ~ n n e r / T e mp. ,....- Sp i 'nr~er/-Femp / I n J F'r c': I"' i [ e F;..' u'n i i n i F'r o f Sp i 'r'~ner L c:,a., t:;..'u',"~ i Inj J::'rofi le/,S'F, i'nr~er/TemF, Ru.n ,_."-'FY/Sr.:-' inner F;: u.n i D iff ]"em? Log F:u'n i q:he a!:!'acl".,ed copy as rec:eiF, i' of clat:a. Received By HAVE A IqAF'F'Y NEW i<eL t.y McFar Land ATO--1 4. 2":,;',r-:' :""" [; 0 I]- ['i _ =:" [:, Fi ";" G i'i =:" ="" G (:i ...:' . . ~... ~. ~..' u I) #.:' ./r'r . C Fa iii C (3 "".'" i)A ")" C i'l (il C: Fi I)A .~.- r-. II "~" C ~ Ill C C) .,~, ">" I-i .='t Ill C C) r-T .. C ~.'J fi'i C fa ..! ... "::" CalliC:O ...' :::" C L:i i'il C 0 ....- · ') ,i C El ill [: 0 ~.. c:' Il, ~... ..;. L., -.':i Ill C I:~U " ..:. [-;0 I:,"' tt .;. (; 0 D i S 'T' R l E-: U 'i" ]: 0 iq Chevron !) & M Expi. orai'ion Services Fx'l:en~ion Ex[:,Loration Ex xon Get -~ y M a r a 't' h o n Mob i L M,::,bi i. E: & I:-' F'hi Ll. ips Pr udhc:,e I-'-',a'x' We L i. i:;: & :[:' Zoh i c:, F:' i I. e :? ARCO ALa~.l..'.a, Inc. P.O. Box iOOS60 Anchoy'age, ALaska DATE' D~'.c_. emhe'r' ,.~o, , ~,o;84 REFERENCE' ARCO Caz. ed Hole F D S i--i '~ ~'~' 8 -- '.-;' 6 -- F:: 4 CCL,,q:-er , · ~i ...... :" I'- ...... ~ ~ ~' "__-2.. __,--~ 4 "- '~' D S .S-4 i"i , o,..-, D'iTf ~emp L.o--::¢ D., £',. 3-1 t" i i -5-'-3--I. CF,S'/,S:p i ri'net D S "-"'"8 ~ f i - i 8-84 "'"" ..... .-'. ,_.m/M..'?/GR D,,.,":',.4-S '~' ~: i --i 7--8"t CN/M5'/GR D,. S ,. ':':-*_.. --,- .¢/ I 'i -i 4-84 CN/i"i;~-."/[,R I), ":-.' ,. ",::-4--"-'- 8-";-',':;-':::'*. ,.., ... ,..:-., ['.'CL/Per f. Recc,-rd D S.,' ¢-"-4-' o_.,-.,o_.,.:-.,, , .., ,..~/ ,., CET Log I), S , 7--;~ i i -i 6-84 CN.,"M.°.../'r-:R_. D S-. ,' i u '~'"" '~ 'i -'~ ...,--c,~ E':N/H.'-'-:/L,-F-.: D., S, 7- i "-,'. ,¢-" ,,. i i - i 6-84 CN/H,S'/[;R r:,,S,, i2-23'~' -~-~--3¢-84 F'ey'fora'ting Record I),. ,".," ., i 2:-- 2 A -~""' i ¢ - c:,,.: - :.,':-:' -..,'"- f':.. C'_ L .,'" P e r I'- I:;'. e c o r d D,. Z.. .,iq-iS---" ii-- '':' '':' - c:' '''~ ,.._ ,._,-.? Co I [ar/Perf_ Log ., ,.:., '~--,- 56/' _. _.c:,, CCL/Perf Reco'rd D S'- i,~ ":' c', 0-84 ,"- 'r . . -.-, ?-i ,_.E, D' ~'' I i 5-7. c:,,. - 'i' ,:.9--84 r'BL,..,., ,-'"'VD D S-. '~ 7-6-/' i i --2-,qa ,'-'n..-".' ,',':',- i ....... ,-.., ,.:- .-' ,> ~-: , ~] 1] e !- D ~.' i 7-8 '""" I i '"--84 r'.":'.-'., ,'r',...' : -. -' -;' ,-,, ,.:. ,- ,.~ ~, I i-I i] e l- ~-" y..ign and re'-:::u':-'n The a'fi'ached copy 8:.::.': rer-eil.",i' ,--'7 HAVE A HAF'F'Y HOLIDAY SEASON! Ke L t'.-.,-: Mc:Far La'nd ' Alaska 0il & ATO-. i ..,.-'" ..;_":' '-7...:' ~-, I I-,,~-.~r4,.:..,-,-'"'42i o 'f' cI ,.'~ 't'a. Chevro'r; Mob i L I) & i~.i J'"i c:, !::, i I. E ro , · . r..xp i. ora 'r i c,'n :'-:err ices'. F:'h i I. I. ~ p:.:: Ex 4. e:.'-:~ -!.. i o'r: E x p L or .:_', 4( i r~'n F:"r' :..:. cl ~", -. ~. C) r_...', E x x ('.:', r., R &: D Ge 4,.- t y ,S:c:,h i r.:': i'd a '..," .:-', I' ~-- ,: o'n £ ',.:: a 't' e .~:.', f F' i I. e ARCO Alask:-, .,t,_. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 23, 1984 Mr. C. V. Chatterton STATE OF ALASKA Division of Oil & Gas 3001 Porcupine Drive Anchorage, AK 99501 DS 4-15 DS 14-31 DS 14-36 Permit No. 78-37 Permit No. 83-111 Permit No. 83-163 Dear Mr. Chatterton: Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/mjb Enclosures cc: SOHIO Alaska Petroleum Co. File PI(DS 4-15)W4-3 PI(DS 14-31)W4-3 Pi(DS 14-36) W4-3 ARCO Alaska_ Inc. I,, ~. Subaldlarv of AllantlcRIchfleldCompany - '" ~ ~'-~ STATE OF ALASKA ALAS,_ .,. ,.AND GAS CONSERVATION .. :vllSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,,, 1. Status of Well Classification of Service Well OIL[] GAS [] SUSPENDED[] ABANDONED [] SERVICE[~[ Water In~eqtor 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-163 3. Address 8. APl Number P. O. Box 100360, A~chorage, AY, 99510 50- 029-21039 ~. Location of well at surface 9. unit or Lease Name 2085' FNL, 1055' FEL, Sec.9, TION, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 2647' FNL, 2601' FEL, Sec.9~ T10N, RlhE, UM 14-36 At Total Depth 11. Field and Pool 2621' FNL, 2530' FWL, Sec.9, T10N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 73' RKBI ADL 28312 12. Date SPudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 12/20/83 12/30/83 01/10/84 N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 9565'MD, 9521'TVD 9516'MD, 9205'TVD YES [~ NO [] 2115 feet MDI 1900' (Approx) 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, LTD/CNL/Cal/GR, CBL, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5~ H-40 Surf 80' 30" 375 sxs Permafrost II 13-3/8" 72.0# L-80 Surf 2678' 17-1/2" Cmtd w/2000 sxs Fondu + 400 sxs PF "C" 9-5/8" 47.0# L-80 Surf 9066' 12-1/4" Cmtd w/500 sxs Class "G + 300 sxs CS 1 7" 29.0# L-80 8751' 9560' 8-1/2" Cmtd w/300 sxs "G" cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING R~CORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9160- 9180' MD 5-1/2" 8780' 8700' 9287 - 9307' MD 9249 - 9268' MD Added on 8/26/84 26. ACID, FRACTURE, CEMENT sQuEEZE, E-I~C. 9229 - 9239' MD w/4 SPF DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9209- 9229' MD Ref: CBL 1/5/84 N/A 9277 - 9287' MD 9614- 9616 27. N'/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None R£C 'i Alaska 0il . ~.~a~ CDr,% Cor~[nis.s,/or/ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ~ - ~ ~ : ~ ~. ~-~ ~' ~' 30 · ~ ~.~ ~, .. NAME r · . - · · Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT-. DEPTH GOR, and time of. each phase. . . . _ _.. . ' ~op SadIeToch~t :. -9~8"_ '-8873' NO~ 0/W Contact ~ -. 9392' 9090' _. Base Sadlerochit . Not Re~ :hed . , . 31. LIST OF ATTACHMENTS . . 32. I hereby certify that the foregoing is true and correct ~o the best of my knowledge Signed ~~~~~ INSTRUCTIONS General' This form is designed-for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise Shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in' item 24 show the producing, intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". ..~-, STATE OF ALASKA ALASKA ~, AND GAS CONSERVATION C( ~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~× OTHER [] Water Injector 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-163 3. Address 8. APl Number P.O. BOX 100360, Anchorage, Alaska 99510 50- 029-21039 4. Location of Well (Surface) 2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM (Producing Interval) 2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM (Total Depth) 2621' FNL, 2530' FWL, Sec 9, T10N, R14E, UM I ' 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 73' RKB ADL 28312 12. 9. Unit or Lease Name . Prudhoe B~y Unit 10. Well Number DS 14-36 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations C~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 8/26/84. RU perforating unit, pressure tested surface equipment. RIH with gun #1, shot 9160-9180' MD 4 spf, flowed well to separator for cleanup, monitored rate, and took shakeouts. POOH - all shots fired. RIH with gun #2, shot .928~-_93~7.' MD 4 spf, flowed well. POOH - all shots fired. RIH - . with gun #3, shot 9249-9269' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #4, shot 9229-9239' MD and 9180-9190' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #5, shot 9209-9229' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #6, shot 9277-9287' MD 4 spf, flowed well. POOH - all shots fired. RD. Secured well 8/28/84. DS 14-36 is a source water injector in the Prudhoe Bay Waterflood Area. The well began receiVing water on 9/23/84. Ref: CBL 1/5/84 14. I hereby,,ce, rtify that the foregoing is true and correct to the best of my knowledge. Si§ned ...... ~ litle Regional Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc_ Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer October 17, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 4-15 DS 14-25 DS 14-27 DS 14-31 DS 14-36 Permit No. 78-37 Permit No. 83-102 Permit No. 83-170 Permit No. 83-111 Permit No. 83-163 Attached are "Subsequent" Sundry Notices for work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/JB/la Attachments cc: Sohio Alaska Petroleum Co. File PI(DS 4-15)Wl-3 File PI(DS 14-25)W1-3 File Pi(DS 14-27)W1-3 File PI(DS 14-31)W1-3 File PI(DS 14-36)W1-3 Alaska Oil & Gas Cons. Commission Anchorage. AR~.~ AI~=I~= Inn In n Suhnldlnrv of AtlantlcRlchlleldCompany STATE-OF ALASKA ALASKA'~-''. AND GAS CONSERVATION C(-"MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~x OTHER [] Water Injector 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-163 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-21039 4. Location of We, (Surface) 73' RKB 12. 2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM (Producing Interval) 2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM (Total Depth) 2621' FNL~ 2530' FWL, Sec 9, T10N, R14Eo UM Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. I ADL 28_ql 2 Check Appropriate 8ox To Indicate Nature of Notice, Report, or Other Data 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 14-36 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool [] [] [] NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations I~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 8/26/84. RU perforating unit, pressure tested surface equipment. RIH with gun ~1, shot 9160-9180' MD 4 spf, flowed well to separator for cleanup, monitored rate, and took shakeouts. POOH - all shots fired. RIH with gun #2, shot 9287-9307' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #3, shot 9249-9269' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #4, shot 9229-9239' MD and 9180-9190' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #5, shot 9209-9229' MD 4 spf, flowed well. POOH - all shots fired. RIH with gun #6, shot 9277-9287' MD 4 spf, flowed well. POOH - all shots fired. RD. Secured well 8/28/84. DS 14-36 is a source water injector in the Prudhoe Bay Waterflood Area. The well began receiving water on 9/23/84. Ref: CBL 1/5/84 14. I hereby,~6trtify that the foregoing is true and correct to the best of my knowledge. e ,ona= .n ,nee, The space below for Commission use Date Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1 ~0 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO A£a.ska, Inc,. P.O. Box ~OOS60 Anchorage, ALaska DATE- ,~eptember t3, ~984 REFERENC'.E' ARCO F:'re~s'ure Data · $ · 2-~ A'---~ '7-22--84 '<PBU: ,~..~--7-22-84 ~D.~ R_.. · .m S 7-2 7-26-84 ~ F'B~.~ 7-4-84 CDBR ~2 ~9 ~''6-28-84 6-28/2~'-84 CDBR i4 36-~' 8-27-84 ~ . - ~,at Jc 3'urvey 7-7-84 CDBR C 8 fll C 0 C a m c o GO C El IlIC 0 HAVE A NICE DAY! Kel. ty McFarLand ATO- ~ 4'~9F~. TRAN~. ~35~ - o f r.I a t a, DI~'TRIBUTION Chevron Exp Lorat i on 5'err i ce~ Ex tens i on Exp Lora t i on Ex xon Getty Marathon Mob i ] Mobil E & F' Phi L L i p.s- F'rudhoe Bay WeLL R&D 5'oh i o State of ALaska F:'i Les ! - ARCO Alaska, Inc. Post Office L 100360 Anchorage, Alaska 99510 Telephone 907 265 6375 E. M. Pringle Vice President July 31, 1984 Mr. Robert S. Burd Director, Water Division U. S. Environmental Protection Agency Region X 1200 Sixth Avenue Seattle, Washington 98101 RE: Prudhoe Bay Eastern Operating Area Underground Injection Control Permit ~ 1 G~!OL ~--2 ,.,-~ G[-~LT ST~..T T_~C '- STAT TEC '- , CONFER: FILF; -- Dear Mr. Burd: Please be advised ARCO Alaska, Inc. intends to initiate water injection into Wells 14-25, 14-27 and 14-36 on or about August 12, 1984. These wells were included in our area permit application dated June 20, 1984, supplemented by our letter dated July 10, 1984. I certify under the penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significiant penalties for submitting false information, including the possibility of fine and imprisonment. (Ref. 40 CFR 144.32) Sincerely, Vice President Production & Drilling Operations EMP/JLG/la cc: C. V. Chatterton Alaska Oil and Gas Commission Gerald Opatz EPA, Seattle Jean Parson Sohio Alaska Petroleum Co. File 3.5-2 RECEIVED AUG 0 2 Alaska 011 & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Inc. ~"~ Prudhoe Bay~ .~ineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer July 18, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 14-25 DS 14-27 DS 14-31 DS 14-36 Permit No. 83-102 Permit No. 83-170 Permit No. 83-111 Permit No. 83-163 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WT/lmh Attachments cc: Sohio Petroleum File Pi(DS 14-25)Wl-3 File Pi(DS 14-27)Wl-3 File Pi(DS 14-31)W1-3 File Pi(DS 14-36)W1-3 ARCO Alaska, Inc. Is a Subsidiary of AtlmntlcRIchfleldCompany STATE OF ALASKA -~. ALASKA ,. AN D GAS CONSERVATION C(. MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL [] OTHERXI29 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. LocationofWell (Surface) 2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM (Producing Interval) 2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM (Total Depth) 2621' FNL, 2530' FWL, Sec 9, T10N, R14E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 73' RKB 6. Lease Designation and Serial No. ADL 28312 7. Permit No. 83-163 8. APl Number 5O-- 029-21039 9, Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 14-36 11. FieldandPool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate ~ Alter Casing [] Perforations Stimulate [] Abandon [] . Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each coml~letion,) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any propo~d work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate DS 14-36 in selected intervals within the. Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Perforation Intervals: Ref: BHCS 12/31/83 9161 - 9191' MD (30') 9210 - 9308' MD (98') DS 14-36 is a water injector in the Prudhoe Bay waterflood area. Sub~ctuent Work 14.1 here~tify ~/~~regoingTue and correct to the best of my knowledge. .~~ ~ /~'3 ~, ~7~ Regional Engineer Signed. . ' ( Title The space below for Commission use/ RECEIVED JUL 2 1984 Alaska 011 & Gas Cons. Commission Anchorage Conditions of Approval, if any: Approved by. COMMISSIONER the Commission Approved Copy AP -~eturned , Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office.,-~..p. x 360 Anchorag~ iaska 99510 Telephone 907 277 5637 April 2, 1984 Reference' ARCO Cased Hole Finals D.S. 3-25 ~' 12-2-83 ACBL/VDL/Signature/GR D.S. 3-26f 11-10-83 ACBL/VDL/S ignature/GR D.S. 13-19 /' 12-28-83 EPL D.S. 13-21~' 1-2-84 EPL · D.S. 13-98~' 3-7-84 CPL/GST Run 3 D.S. 1.4-7 ~ 3-3-84 Temperature D.S. 14-36/' 1-5-84 CBL/VD Run 1 5" DA Run 1 5" DA Run 2 5" Sch Run 2 5" Sch 5" Sch Run 1 5" Otis Run 1 5" Sch ~se sign and return the attached copy as receipt of data. HAVE A HAPPY EASTER! Kelly McFarland ATO-1429F Trans. # 124 DISTRIBUTION Chevron D&M Dallas Drilling Ext. Exploration Exxon Getty Marathon Mob i 1 Mobil E & P Phillips Prudhoe Bay Well Files R&D Carolyn Smith Sohio State of Alaska ARCO Alaska, Inc. Post Office~c~x 360 Anchorage, ~ska 99510 Telephone 907 277 5637 March 7, 1984 Reference: Arco Magnetic Tapes 14-36---2-20-84 D.S. 14-27 2-22-84 D.S. l-lA~ 1-30-84 D.S. 12-26/ 2-24-84 CORRECTED OH # 123183 w/listing GO CORRECTED OH #228638 w/listing GO OH #68974 w/listing OH #252538 w/listing GO Run 1 Sch /~" Please sign and return the at~ached copy as receipt of data · Happy St. Pats Day Kelly McFarland ATO-1429F Trans. # 088 DISTRIBUTION Chevron D&M Dallas Drilling Ext. Exploration Exxon Getty Marathon Mobil Mobil E & P Phillips Prudhoe Bay Well Files R&D Ca r ° 1 yn~h / ~/~/9~ ~ !~~~/~_~ ~$t.-a~l:eL.e~' Alaska~ A!zs~ Oil & G~s Cons. Commission GEARHART INDUSTRIES, INC. February 29, 1984 Arco Alaska Inc. P.O. Box 6247 'Anchorage, Alaska To Whom It May Concern' RE: L.I.S. Tapes for DS 14-36 Please disregard previously delivered L.I.S. tapes on the above well because the digitized repeat section was recorded from the field instead of the main run section. The enclosed tapes were redone with the main run section recorded. Sorry for any inconvenience. Regards, ~ -- /3-?z/f ~ David Douglas DWD/sjt Enc. ECEI'VED MAR 1 21984 .... "'~' Post Office Box 102436 Anchorage, Alaska 99510 Telephone 907-562-2538 , , ~*~'-; STATE OF ALASKA ALAS~ ...... L AND GAS CONSERVATION '.MISSION WELL COMPLETION OR RECOMPLETIOh. REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ Water Injector 2. Name of Operator 7. Permit Number ARC0 'Al aska, Inc. 83-163 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21039 4. Location of well at surface m - 9. Unit or Lease Name 2085' FNL, 1055' FEL, Sec.9, T10N, R14E, UM JL:%C,"-'.TiONSI Prudhoe Bay Unit At Top Producing Interval r 10. Well Number 2647' FNL, 2601' FEL, Sec. 9, T10N, R14E, UN Surf. , -__I___ 14-36 At Total Depth i B. H.~ 11 . Field and Pool 2621' FNL, 2530' FWL, Sec.9, T10N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i I Pool 7~' RKB ADL 28~12 - 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 1 2/20/8:3 12/:30/83 01/10/84I N/A feet MSL 1 17- Total Depth (MD+TVD) 18. Plug Back Depth (MD+-['VD} 19. DirectionalSurvey ] ~;~);p~whereSSSVse' I 21. Thickness of Permafrost 9565'MD,9251 'TVD 9516'MD, 9205'TVD YES CZ] NO [] N 2115 feet MD 1900' (Approx) 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, LDT/CNL/Cal/GR, CBL, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE; WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 80' 30" 375 sxs Permafrost II 13-3/8" 72.0# L-80 Surf 2678' 17-1/2" Cmtd w/2000 sxs Fondu + ~D0 sxs PF "C" 9-5/8" 47.0# L-80 Surf 9066' 12-1/4" Cmtd w/500 sxs "G" + 300 sxs CS I .. 7" 29.0# L-80 8751' 9560' 8-1/2" Cmtd w/300 sxs "G" cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE 5-1 / 2" 8780' 8700 ' 2~. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/^ 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL cHOKE SIZE IGAS-OILRATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE * 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None FEB 2 '-s ' - - '- *..~'DH- A,,i2;'.'.,~ 0i! ~ u;J.,, .¢.,L5.',.'].S, Form 10~,07 Submit in duplicate Rev. 7-1-80 DRN/WC06 CONTINUED ON REVERSE SIDE ;..' r: . .; -.---~1 ,--GEC~LOGic:M-~-Ri~E.~'$.~ -: :? ~:. '-; ,-: ~t~;: ' 'i: _' ~' :;;:;:'.'~?-!. -'-"' ; ' ".:~ ~ :FoRMAT'iON.T,,~STS: . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochi t 9158' 8873 ' NONE O/W Contact 9392' 9090' Base Sadlerochit NOT REA~ HED 31. LIST OF ATTACHMENTS Drilling History, Gyroscopic Survey (2 copies) 32. I hereby certify that the foregoiT/sj~ true and correct to the best of my knowledgeArea Drilling Engr. ~, ,~/~--,~ Signed ?~'L/', v Title Date ~- . . i -/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: FlowinD, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". DS 14-36 DRILLING HISTORY NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran 69 jts 13-3/8,' 72#/ft~kw/FS @ T2,6~7+8~' Cmtd 13-3/8"csg w/2000 sxs Fondu + 400 sxs PF "C". ND 20" 'h~ytlril.~..~..d' 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to 9081'. Ran 226 jts 9-5/8" 47#,/Nw/FS @ 9066'. Cmtd 9-5/8" csg w/BOO sxs "G" cmt. Tstd csg to 3000 psi _o~.t Drld FC & cmt. Tstd csg to .3000 psi - ok. Drld FS & 10' new f~r~orm. Ts%d form to 12.5 ppg EMW - held 12.0 ppg. Drld 8-1/2" hole to~565_~(12/20}83'), Ran DIL/BHCS/SP/GR f/9560' - 9050'. ~.LDT/CNL/Cal/GR f/95-60' - 90-§OJ'~? GR to 2600'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 sxs CS I + 128 bbl A.P. Ran 20.jts 7" 29#/ft,Af/8751' - 9560'. Cmtd 7" lnr w/300 sxs "G" cmt. Drld cmt to 9516' PBTD~.~ Displ well to NaC1. Run CBL f/9516' - 8500'. Ran 5-1/2" completion assy w/tail @ 8780' & pkr @ 8?00' & SSSV @ 2097' Tstd hanger and packoffs to 5000 psi - ok. ND BOPE. NU tree & tstd to 5~00 psi - ok. Displaced well to diesel. Dropped ball & set pkr. Secured well & released rig @ 2000 hrs, 01/06/84. DRN/DH53-tw ARCO AI,ASKA~ INC:. D'."-; lq-~ WELL NO: 36 SIGMA-.GYRO dOB NO: AO184RO405-NZ PF~I...IDHOE BAY, NORTH SI...OPE~ ALASKA '.:3IGMA-GYRO~ 0.....'.--.~516 M.l]~ SURVEYOR: CORAM/dAHN., DATE RUN: 10"-dAN-84 '...=.:IGMA 175 NO: 662, PROBE NO: 0/.:,4 I::'OF;:E',_--;IGHT: N 1.4, 46 W :'-':;URVE:"Y TAI<EN F'ROM WEI.,..I_HEA[I VERTICAl... SECTION CALCUI_ATED IN F'LANE OF PROPO::;AL DIRECTION: '.3 66 DEG....,":'1 MIN. W RECORD OF SURVEY RADIL.IS OF RURVATURE METHOD ARCO AI_ASKA, INC,, D:=; 14, WELL NO: :36. SIF~MA.-GYRO PFdJ[IHOE ~AY~ NOR].'H SLOPE::., ALASKA ,J 0 B N 0: A 018.4 R () 405.-N Z C: 0 H F:'U ]"a T I 0 N .T...I~'I E DATE 13 ". 54. -" 11 18- ,J A N - F-: 4 F' A,.':; E N (:ii. '1 ' HEAF:URED DF:: I F'T E R ! FT DE;PTH ANGL. E. D I REC:T T FIN.. L. ENGTH [~ EF ' TH F' E E T D H D M F E E T F E E T TRUE COURSE VERTICAL VERTICAL SLIBSEA R E C: T A N G U L A R C L 0 S U R E DOGLEG SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTIOI',I SE:VEERIT FEET FEET FEET FEE]'' D M DG/100F:' 0. 0 0 () 0 (). 0.00 .1. 00. 0 /=. S 2,6 0 W 100. 1 ()0.00, 2()0,. 0 4 S 5:3 1 E 100. 200.00 :::.:00. 0 7 S 49 14 E 1 CDC). :-=:C)0.00 40,0,. 0, 6 '.3 .'=55 4 E 100., 4 C) 0.0() !::~,(')(') (') /=, '"' 66, =~"' . .... ....... ;=, .. 7 E 100 .':;~00 o0 600. 0 8 S 67 16 E 100. 600.00 '70(). 0 8 '.:; ::2 28 E 100. 700.00 800. 0 11 N 84 56 E 100. ::',00.00 900. 0 1 ::: N 6,:z: 6, E 100. ',-'.~00,, 00 0.00 =69.00 0.00 0. ()0 0.07 .31.00 0.08 '.-]; 0.04 W O. 10 '1. :.7..' .'1.. 0,0 O. 24 S Cf,. 00 W 0.02 2:.:: 1. O0 0. :34. S (). 12 E · -0.07 :3:31.00 0,46 S 0,2'7 E -0.18 431.00' 0.55 S 0.4.3 E: -C) '" ~"-' · :, 1 I C) C) ('I, 62 ':' . ._,.:, ..... 0.61 E -0.50 6, :31.00 0.68 S 0.84 E -0.75 731.00 0.69 S 1. 12 E -1.18 8.31.00 0.57 S 1.53 E 0.00 0 0 0.09 S 26. 0 W 0.24 S 0 5:6 W 0.36 S 19 56, E 0,.~':'. ._ ._, '.3 .... '--'c.) :]'.,,'.-], E 0.70 S 38 28 E 0.87 S 44:33 E 1 o¢.~ ':' ~0 54 E I :32 :=; .=,'::' ":' . · ....,.1E 1.6,4 '._=: 6.9 33 E: 0.00 0. 10 0.11 0.05 0.02 0. (.) O. 03 O. 04 0. ()7 0.14 1000. 1100. 1200. 1:300. 1400. 0 19 N 54 51 E 0 13 N 4(:) :B1 E 0 11 N 2' 48 E () 10 N ], 15 E 0 8 N 38 28 W 100. 1000.00 100. 1099.99 1 O0. 1199. '.:.~'.'.-~ 100. 1299.99 100. 1399. '.-.'¢9 -1.73 9:31.00 0.28 S -2.18 1030.99 ' 0.03 N -'2, 44 11:30.9'..7..' 0. :37 N -2, 57 1230, 9'9 0.6".:'/ N -2.6.0 1330. '79 O, 95 N 2.01 E 2.36 E 2.49 E 2.51 E 2.42 E"' 2.03 S 81 56 E 2.36 N 89 14 E 2.52 N 81 29 E 2.60 N 74 37 E 2.60 N 68 30 E 0.0.5 0.12 0. 14. 0.02 0. 1 '2 :L 500. 1600. 1700. 1800. 1900. 2000. 2100. 2200. :2300. 2400. 17 S :E:9 19 W ':"7 '.:; .~,::: ".'-'"=-' W 2:=: '..:; 57 11 W 26 S 40 54 W 2.6,. S 31 57 W 0 31 :E: 12 52 W 1 5 '-:-'; 12 10 W I I :3 16 2:2 W I 5 S 1 I 26 W i 1 :_:: ':.' 21 W 00. 1499.99' 00. 15'? 9.99 00. 16,99.99 00. 1799.99 00. 1 :_::99.98 100. 1999.98 100. 2099. '.--./7 . 100. 2199.95 100. 2299.94 100. 2399.92 -2.36 1430.99 -1.79 1530.99 -1.14 16,30.99 -0.43 1730.99 0.25 1830.98 0.85 19:2:0.98 I. 6:--: 20.30.97 2. :31 2130.95 · 3.93 2230.94 4.86 2330.92 1.11 N 0.95 N 0.60 N o. 10 N 0.52 S 1.:30 S 2.68 S 4.47 S 6,.25 S 8.08 S 2.09 E 1.54 E 0.99 E 0.42 E 0.04 W 0.36 W 0.67 W 1.1:3 W 1.57 W 1.79 W 2.37 N 6,2:10 E 1.81 N 58 2:_,' E I. 15 N 58 48 E 0.43 N 76, 0 E 0.52 S 4 39 W 1.35 S 15 40 W 2.76 .S 14 :--: W 4.61 S 14 9 W 6.45 S 14 5 W 8.27. '.S 12 29 W 0.2:B 0.20 0.02 0. I:B 0. r ) O. 1:9 0.55 0. 10 0. 11 0. 18 2500. i 1. '.-; ].1 18 W 26,0o. (') 56, .'=; 1.5 10 W :270('). 0, 45 S /=, '=..".=..' W 2:E:00. 0 4.4 S 5 56 E 2900. · 0 26. '.:~ 6 49 E 100. 2499.90 100. 2599.89 100. 2699.88 100. 2799.87 t 00. =.'. 89 9.8 6. 5.76: 2430.90 6.78 253(3.89 7.6.2 2630.88 :3. 14 2730.87 8.4- 4 28:=:0.86, 9.84 S 11.51 S 12 97 ¢' ] 4.26 ',3 15.29 '.-_.; ~_.":' 00_ W 2. :39 W 2.67 W 2.68 W · --' F,/-, W 10.04 c._, 11 c.,,-}~_. W 11.76 :3 11 45 W 13.24 S 11 .=-:8 W 14.51 S 10 3:.:: W 15.50 S 9 .31 W 0.16. 0. 10 0.2:_=: 0. 16 0.30 AF"¢CO ~I.._A:BK ~., ! N F:. :D S 14.~ 14 E L L. N 0: 3. 6 c:...., 113 FI ~-'-G Y R lEI F'RI_IDHOE B~Y~ NORTH SLOPE~ AL.~SF'.'.'~ ,..lOB NO: AO184RO405-NZ COMPUTAT I ON T I ME DATE 13: 54: I 1 18-,..lAN-:=:4 · ,, PAGE NO. 2 TRUE MEASIJRED DR IF'F DRIFT COURSE VERTICAL VERTICAL :=:LIBSEA R E C T A N G U L A R C L 0 S LI R E . DOGL. EG DEPTH ANGI_.E DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION '.SEVER FEET D 1'4 D M FLEET FEE"r FEEl" FEET FEET FEET D M DG/1 :3000. 0 28 S 6:34 W 10(). 2999.86 8.75 2930.:96 16.07 S 2.56 W :3100 0 '="2 '=' o.-., 4. E .16)0 :30'2'?~.86 o ?4 :=:¢x=:A ~"/- :2 46 W · ...... ._ ................. c .... 16, 78 ..., ¢' . :3200. () '2 S :3:3:3:3 W 100. :3 :t 9',.}. 86 9.15 :3130. :=:6 17. i.!:2 S 2.5(3 W :3:300 .............. 0 6 ¢' 40 4. 7 E 100 22'.]'~'-':'¢ '-':,_,~.9 ..... ..'-":':~: 2 ::: ¢) .86 17 45 ._,c. .....-, .4:=: W :..-:: 400. () ! 0 S :2 :=: :37 E. 100, :3:3'..=' 9.86 9. 1 :=: :'-: :3 :.".': 0, :=: 6 17.67 S 2. :.--: 4 W :'::.~A() 0 7 S 4.0 ._ 7 E :1 (')0. :::49'-}. 86 9 1:3 34.:3() 86 17. o,:, .'=, 2. 18 W :360(). 0 12 S 32 2:3 W 100. :3599.85 9.:;:.'2 3530.:=:5 18. 15 S 2. t6 W :3700. 0 1:3 S 83 :=: W 10(). 36'29.85 9.58 3/=,30.85 18. :_-:5 S 2.47 W 3800. 0 17 S 85:35 W lc) 0. :37'79.85 10.00 3730.85 18.:39 S 2.92 W :3'F/00. 0 4.2 '.="; 65 29 W 100. 38'.=.rF~.85 10.86 3830.,c_:5 18.61 S 3.7.6 W 16. :27 :..-.-; '-.?. ._,":' W 0 .11 16.96 :-]; :=: 20 W ' 0.2 ::-': 17.40 S 8 15 W 17./=,:--: ':'._,o,_, 6 W 17.:=:2 S 7:32 W 18.02 '._=;6 58 W 18.28 S 6 4:..3 W 18.51 S 7 40 W 18.62 L=; 9 I W 18.98 S 11 26 W 0.32 0.16 O. 07 0. C, ) 0.2() 0.1 '? 0.06 0.45 4000. :3 5:3 S 6'P 20 W 4100. 8 4 S 68 4,6 W 4200. 11 :34 S 63 0 W 43A0. 15 38 S 62 :'::6 W 44-00. 17 5:=:' S 56 53 W 1 O0. 3°?'.~'.-.-~. 76 1 PO. 409'2.1 ~ 100. 4197.71 100 · 4294.88 100. 4390.60 14.89 39:30.76 25..~:0 4030.19 42. :36 4128.71 65 · 83 4225.88 ~4.52 4321.60 20.15 S 7.47 W 23.88 S 17.21 W 30.:E:5 S 32.78 W 41·5'::? S 53.70 W 56.15 S 7:9.67 W 21.49 S 20 21 W 29.44 S 35 47 W 45.01 .'iS 46' 45 W 67.92 S ~".) 1..5 W "P6.6..5 '.S._4~ 29 W :3. 18 4. 18 :3.62 4.07 2. :=:6 45('D(). 20 38 :-3 60 6, W 4600. 21 6 S 60 57 W 470o, 21 6 ¢'._, 61 13 W 4:=:00. 20 .'.55 S 61 2:3 W 4'.:.)0c). :.30 58 S 62 2 W ~(')(')('l . 2("1 ._,_,~':' :--; 62 15 W t":~. · . . .... 100 .'.=_-'A :2:7 S /-.1 57 W 5200. 20 2:3 '.S 62:3~ W 5:300. 2£) 46 S /_-,3 0 W 5400. 20 54 S /_-,3 24 W 100. 44:=:4.97 10("). 4578.41 .1. OA. 4/=,71.70 100. 4765.05 100. 4858.43 100. 4951.80 100. 5045.28 100. 51:38.94 100. 5232.56 100. 5:326. 127.25 4415.97 162.69 4.509.41 198.54 4602.70 2:34.25 46'?~6.05 269.89 4789.43 :305.59 4882. :=:0 34..1.. 00 4976.28 375. ?5 50/=,'=.-*. 94 411.04 516:3.56 446.55 5257.02 73.42 S 106.:=:5 W 90.95 S 137.87 W 108.35 S 169.37 W 125.56 S 200.85 W 142.51 S 232.35 W 159.23 S 264.01 W 175. :=:5 C-; 2'.-}5.39 W 1'P2.14 'S 326.42 W · :,A,c: 19 o :357 71 W .~... - m . --, · 224.2:3 :=; :38'?. 46 W 129 64 c. 55 :::¢'1 W 165. 16 S 56 35 W 201.08 S 57 24. W 2:3./-,.87 S 57 59 W 272.57 S 5:=: 29 W 308.31 S 58 54 W 343.77 S 59 14 W · -., ,=, - . ._,7,_,.77 :~ 59:31 W 413.:=:8 S 5'P 48 W 449. :3'?~ S 60 4 W a:-'- . 0.57 0.10 0. 18 0. '- ) 0.08 0.37 0.3:3 0. :E:,=-/ 0.20 · 5500. 20 53 :=; 6:3 4:3 W 560c). 20 45 S 6:3 57 W 5700. 'ZO 1:=: S 64 12 W 5:=:00. 20 45 ,.E; 64 21 W .5':T¢OCD. 21 2 S /=,4 25 W 100. 5419.44 1 c)O. 5512. '? 1 1 ()0. 560/=, · 56 100. 5700.20 100. 5793.62 482.17 5350.44 517.6:3 5443.91 552.71 5537.56 587.76 5631.20 623.43 5724.62 240.10 :=; 421.3'P W 255.77 S 453.30 W 271· 10 c.._, 4:=:4 .84 W 286.:32 S 516.44 W 301.74 S 548.6:3 W 484. 'P'P :=; 6cED 20 W 520· 48 "--=; 60 34 W 555.4"F.~ S 60 47 W 590.50 S 61 0 W 626. 13 S 61 11 W 0.11 c). 16 0.4.5 0.45 0. '-"':' ARC 0 A I...A:.=:I< A, I N C. DS 14., WELL. NO: 36 SIGMA-'-GYRO PRIJDHOI5 BAY., NORTI-~ '.=;L. OF'E., AL. AF.;I<A ,J 0 B N 0: A 0184 R 04. () 5-N Z C 0 I'1F' U T A T I A N T I ME [sATE 1:3: 54: 11 18-._1AN.-84 PAAE Nfl. :3 TRUE MEASURED I"~RIF:T DRIFT C:OURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 .L=: U R E DOGLEG DEF'TFJ ANGI_E DIRECTION LENGTH DFPTH SECI'ION TVD C 0 0 R D I Iq A T E '.B DISTANCI= DIRECTION SEVERIT', F:EET D M D M F:EET FEET FEET FEET FEET FEET D M DG/100F" 6000. 21 23 L:: 64 4'7 W 6100. :2:1 3:=: S 65 5 W 62c)c). 22 6 S 65 23 W 6:300. 22 21 '.:J; 65 18 W 6400. 22 38 S 65 2'7 W 6500. 22:20 .S 65 23 W / ,- o.5 66 () A. 2. 2 1 S '-:,.:, ....... 14 6.. '70. 0 . 21. 4 :z: ,:....., 65. M.. :L W 6800. 21 17 8 66 19 W /::,'?AO. 20 · _,.. S 66:2:2: W 100. 58:36.84 100. 5'279.90 1 c)('). 60'72.72 100. 6165.2'.-.TM 1()0. 6257.68 10C). 6 =:50.07 1 c)O. 6442.67 1. 00. 6535,47 i c)0. 6628.50 100. 6721.81 659.6c) 5817.84 696 '"' . ..: 1 591 (). 90 7:3:3. :2:,'9 6003.72 771.21 6096.2':':'~ 809, 48 6188,6:3 847.7'.:-: /:,281.07 885.47 6373.67 .v ~.:z,. 72 6466.47 95'.;). 38 655'...'.~. '.-}'25.35 6652.81 317.26 S 5:31.:33 W 332.77 S .614.5c) W 348.:34 8 64:3.27 W 364. 12 S 682.66 W 380.06 S 71'7.45 W ..., .~.., ...... 7._,z. 24 W 41.1.64 :E; 786.59 W 426 'F,'6 '.:-; '--'""" 55 · ,"', .,::. ~,.). W . ,:,._ 4.07 W 441 :=:1 ':'._, '-'.~ 456.19 S :_::::.:7.04 W 662.27 S 61 23 W 698.82 S 61 34 W 735.93 S 61 45 W 773.70 'S 61 56 W :::11.90 S 62 5 W ,-'..... 10 S 62 14 W 88'7.79 S 62 2:3 W ,=r:.,ZL ,',:", ':' 62 31 W .. ,,. --..'],'.,:, .., 961.58 $ 62 39 W 9'.:.~7.47 S 62 47 W 0.38 0.20 0.55 0.26 0.29 0.3 ) 0.3:3 0.31 0.47 0.42 700(). 20 11 S 6'7 7 W '7100. 19:33 S 67 24 W 7200. 18 54 S 67 59 W 73('~0. 1.8 19 ::i: 68 12 W '740c). 17 42 S 69 36 W 1 c)O. 6815.46 1030.43 6746.4/_-. 100, 6.909.50 1064.42 6840.50 100. 70c)3.92 I c397. :36 6934.92 100. 7098.68 I 129.27 702'.~. 68 100. 71~3.78 116c). 16 7124.78 46?. 99 S 919.28 W 1032.46 $ 62 55 W 0.7:2 483.12 S .950.64 W 1066.36 S 6:3 4. W ' 0.63 495.63 ,S ~81.12, W 109'i.,'~. 2(') $ 63 12 W 0.68 507.53 S 1010.74 W 1131.01 8 63 20 W 0.60 518.66 S 1039.59 W 1161.79 S 63 29 W c).75 :3000, 15 11:3 79 14 W :E:100. 15 19 S 81 13 W :E:200. 14 54 S :}:2 44 W :E:300. 15 2' S 84 25 W 8400. 15 3::: 8 86 9 W 100. 7289.30 1189.72 7220.30 100. 7385.25 1217.83 7316.25 100. 7481.60 1244.50 7412.60 100. 7578. 19 1. 27£). 18 7509. 19 100. 7674.82 1295.63 7605.82 10c). 7771.38 1321. 12 77c)2. :38 100. 7867.85 1:2:46.69 77'? 8.85 100. 79/:,4.3'.-.? 1371.83 78'25.3'.-.? 100. 8061.00 1396.53 7992.00 100. 8157.44 1421.57 8088.44 528.96 L=: 1067.34 W 1191.22 S 63 38 W :.::A 5/-. '.:-; 10'.=.~:2:82 W 121'P '-"-' '..':: 6:3 47 W - - . - ,. . . ~::,~:% 547.04 S 1119'.21 W 1245.75 S 63 57 W 554.40 S 1144.02 W 1271.27 S 64 9 W ~/-,o. 9';.'_ _. ~,c. 11 :,,:, . ';~."::. _ W 1'='9/-,_. _. 54.'S 64 .-..."-"-' W 566.42 S 1194.:33 W 1321.84 S 64 38 W 570.._. ¢',_.':' S 1 ...-.., 9.. c')...._-, :::.. W 1:347 . ~_'-.' 1 c.._. 6. 4 56. W 574.52 S 1246.1c) W 1:372.17 S 65 15 W 577.40 S 1271.78 W 13'F~/=..72 S 65:35 W 579.57 S 12.c.~::-:.14 W 1421.64 S 65 56 W 0.96 0.81 1.06 O. 48 0. ~ .. 0.80 0.54 0.57 0.45 0.76 :i.:.':500. 16 21 ,.E; :E:::: -2:6, W 8600. 17 13 N 8'2 9 W 8700. l:E: ~::6 N 87 ~P2 W :=:800, 19 :]3 N 84 1. 4- W :::::,:.t A (-~ . 20 23 N ,_,'=":'._, :37 W 00. ::-:253.56 1447.33 8184.56 0c). 834.9. ':-':9 1473.88 828c). 29 00. 8444.44 1501.73 8375.44 00. 853'2.04 153c). 46 8470.04 00. ',E:633. I 2 1559. 94 8564. 12 5:::c') 83 c. 1F:2M 6:3 W 1447 34 8 /-,6 20 W -- ~ m '--' -- -- ~ - -- 580.96 S 1354.56 W 1473.89 S 66 47 W 580.08 S 1385.31 W 1501.86 S 67 17 W 577.75 S 1417.65 W 153o.86 8 67 50 W 574.17 S 1451.35 W 1560.80 S 68 25 W 0.9:E: 1. 07 1 .48 1. 24 1.18 ~ ~ C 0 ~1_ ~'.iii; K ~, I H C. ) S 14, W E L.. L Iq Fi: 3 6 'F; 1' C.~ M A-. f"~ Y R f'l :'RIJDH(:)E.. BAY, hlOF(I'H '.E;Lr)F'E~ AL. ASKA ,JOB NO: AO184RO405-NZ COMPUTAT I ON T I ME DATE 1 :'::: 54: 1 1 18-.,J A N- 84. F'AGE NO. TRUE · 'IEASURED DRIFT DRIFT COURSE VERTICAL VERTIF:AL SUBSEA R E:' C T A N G U L A R C L 0 S LI R E: DOGLEG DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TV.D C 0 0 R D I N A 'T E S DISTANCE DIRECTION SEVERITi FEE]'' D I"1 B M FEET FEET FEET FEE]" FEE]" FEET D I',1 DG/100F'" ':.-.,'000. :21:37 N 8:;.:" 31 W 'i;:' 100. ':'.."2 1/_.., N c.,.-,,=,... 0 W '?'200: 21 41 N 81 14 W '.-..~ ::: (] C~ . 21 =;._ ...,':' N :=:_ 0 4 0 W 9400. 21 45 N 79 4'.';~ W 'FJ450. 21 55 N 7'P 1';:' W 100. 8726.47 1590.86 8657.47 100. 8819.22 1622.82 8750.22 10£;. 8:-.'¢ 1 I. ?.~5 1654.62 8842. '?~5 100. ".-.'~004. ::::0 1685. ?2 ,c':'.-}35.80 100. '~0'F¢7.64 1 '716. '.'.-¢'? '.:.~028.64 5('~. '.:.'¢ 144. (;5 17:32.41 :;¢075. (;5 56'.:).84 S ].486. '.:.>4 W 15'?¢2. :3?, S 6':-.¢ 2 W =i'-'"' c:. 6'F' 40 W · '::~/~,4 °2 c. 1..2.:, ~:'7 W 1/-'::.'~ 2.7 55'?¢.36 S 1561.01 W 1658.21 S 70 17 W 553.53 S 1577.67 W 16'70.84 S 7(; 53 W 547.20 S 16:]-:4. :30 W 1723.48 S 71 2'.-.-¢ W 543.80 'S 1652.5S~ W 1737.76 S 71 47 W 1. 0./_-,8 ¢;. 64, 0.28 0. :3'8 0.5~. :'RO,_IE)-:TED TO F'BTD ~:¢!'.5;I./~:,,, 21 5;!5 N '7'~ 12 W 66. '.:.)205. 27 1752.78 S¢136.27 53'F.J. 18 S 16.76.80 W 1761. :36 S 72 10 W 0.00 :' R O,J E C T E D T 0 T D '7565. 21 5;5 N 7'.-T~ 12 M 4S]. 'F/250.73 1767.8S~ '~181.73 535.76 S 1694.77 W 1777.44 '.:-..: 72 27 W 0.00 F I hlAL C LO:":;LIRE - D I IRECT I 0 N: D I STANCE: S 72 DEGS 27 M INS 25 SEC::_-'; W 1777.44 FEET ARCO ALASKA~ INC:. DS 147 WELL NO: 36 .'E:IGMA-OiYRO ,JOB NO: AO184RO405-NZ F'RUDHOE [~AY~ NORTH SL. OF'E, ALASKA SIGMA-GYRO~ 0.-~)516 MD~ SLIRVEYOR: CORAM/JAHN., DATE RLIN: 10-,_1AN-84 '.SIGMA 17.5 NO' ~-- '-~ ' '"' 064 · :,6~, FRUBE NO: F:'CIF~E[E;I[iHT: N 14 46 W SURVEY TAKEN I::'RIZIM WELLHEAD RECORD OF INTERPOLATED SURVEY ARFO ALASKA, INC. l.J.:, 14, WEI...L NO:. ._,'='/~_, ':'._, I nMA-GYRO_ _ PRUI]HF~E BAY, NORTH SLOPE, ALA.SI<A ,_lOB NO: A0184RCT405-.NZ CCI M P U T A T I 0 N T I ME DATE ?, : , 8-._1AN-84 1:3:._6 :'::7 I PAGE NO. 1 ..................... M A R K E R ................ ......................... C 0 D E .............. FLAME TRUE SUBSEA MEASURED VERTICAL MD-TVD VERTICAL R E C T A N G U L A R C L 0 S U R E VERTICAL DEPTH DEPTH DIFF DEPTH C 0 0 R D I N A T E S DISTANCE DIRECTION THICKNESS FEET FEE:]' FEE]' FEET FEET FEE'[' D M TOF' SAG RIVER TOF' t=:I.-IUBL I K TOP SA['~I_EROC:I.-JIT I."ICF'[' 'I'OP ZONF :=: / ()WC T Cf P Z 0 N E~..'"' 9056.00 8778.41 277,6 870'.-=~. 41 9077.00 8'7'.TJ'F.~. 74 279.3 8730.74 9158.00 887:3.00 285.0 8804 .. 00 "" '""""=: (]T(:)'- '"""" :~..:, ..:._,. ~ 0 ..: ,:, 01 297 () '::':) =;':~ 01 · . 1~ i, i. ,.' ._ ... .-.~ .:, ::, .,:., 0 0 '.::) ('~ '.:.) 0 ..... 21 :3 <"} 1 '-':, ':i'~ (:~ ...'.'- 1 · .. 1 .-. 46....,. 00 91 .=_;7.96 307. CT .-.-..,,:,,-_,, "/ 567.03 S 1507.68 W 565·:_::7 S 1516.20 W ..... '~,"'= 4.6 W · ":;/-. 1 6 5 S 1 .. ,,.:.. 551.95 S 1606.83 W 547.71 S 163'1.37 W ~o 7.5 c. 1/-.58 (')':-.> W · ...--" mm -.~ . -- # # . 1610.78 S 69 23 W 1618.35 S 69 32 W 1644.35 S 70 2 W 16~8.~ S 71 3 W 1720.86 S 71 26 W 1744 66 c. 71 .':",':' W · ._. ...._1 Suggest~ form to be inserted in each "Active" well folder to d]eck for timely ccxnpliance wJ.~ our rc<julations. · '" ~perator,' W~I 1 N~un~ and Number Reports and Materials to be received by: ~--~ ~-~ Date Required Date Received Remarks · , _ · Ccmpletion Report Yes ~ _ ~ ~. _. ,.~.~..._ ,. /,..? :~. --. '. · ~_Well History yes d~",~_3-~'~'_ i,D.. ~/"~':, .... - · .. -- Core Chips .... ,/~ 4 - , Core Description ....... ., ... Registered Survey Plat · Inclination Survey ,f /.:.: ..... ' - x Directional Survey Drill Stem Test Reports , .." .:, _ Proddctidn Test Reports Logs Run. Yes . · ....Digitized Data ? ~-~, STATE Or: ALASKA ~ .... ALASKA ,L AND GAS CONSERVATION C~..,IMISSlON MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drill,lng wellx[~ Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 83-163 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21039 4. Location of Well 9. Unit or Lease Name FNL, 1055' FEL, Sec. 9, TION, R14E, UM Prudhoe Bay Unit at surface 2 0 83 ' 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. RKB 73' ADL 28312 10. Well No. 14-36 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool For the Month of. January ,1984 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well (~ 0100 hfs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran, cmted & tested 13-3/8" csg. Drld 12-1/4" hole to 9081'. Ran, crated & tested 9-5/8" csg. Drld 8-1/2" hole to 9565'. Arctic packed 9-5/8" x 13-3/8" annulus. OH logs. Ran, cmted & tested 7" lnr. Ran CBL. Ran 5-1/2" comp. assy. Secured well & RR ~ 2000 hfs, 01/06/84. SEE DRILLING HISTORY 13. Casing or liner run and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40 weld conductor set (~ 80'. Cmtd w/375 sxs PF II. 13-3/8", 72.0#/ft, L-80 BTC csg w/FS ~ 2678'. Cmtd w/2000 sxs "Fondu" + 400 sxs PF "C"; 9-5/8", 47.0#/ft, L-80 BTC csg w/FS @ 9066'. Cmtd w/500 sxs "G" cmt + 300 sxs CS I. 7", 29#/ft, L-80 BTC csg f/8751' - 9560'. Cmtd w/300 sxs "G" cmt. SEE DRILLING HISTORY 14. Coring resume and brief description NONE 15. Logs run and depth where run DIL/BHCS/SP/GR f/9560' LDT/CNL/Cal/GR f/9560' CBL f/9516' - 8500'. - 9050'. - 9050'. GR to 2600'. O. DST data, perforating data, shows of H25, miscellaneous data NONE 17. I hereby certify that the for/e~7oing is true and correct to the best of my knowledge. NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in d6plicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10404 DRN/MR61 Submit in duplicate DS 14-36 DRILLING HISTORY NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2" hole to 2708' Ran 69 jts 13-3/8" 72#/ft, w/FS @ 2678' Cmtd 13-3/8"csg w/2000 sxs Fondu + 400 sxs PF "C". ND 20" h'~dril. Instld' 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to 9081'. Ran 226 jts 9-5/8" 47#, w/FS @ 9066'. Cmtd 9-5/8" csg w/500 sxs "G" cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 12.0 ppg. Drld 8-1/2" hole to 8565'(12/20/83). Ran DIL/BHCS/SP/GR f/9560' - 9050'. LDT/CNL/Cal/GR f/9560' - 9050'. GR to 2600'. Arctic packed 9-5/8" x 13-3/8" annulus w/300 sxs CS I + 128 bbl A.P. Ran 20 jts 7" 29#/ft, f/8751' - 9560'. Cmtd 7" lnr w/300 sxs "G" cmt. Drld cmt to 9516' PBTD. Displ well to NaC1. Run CBL f/9516' - 8500'. Ran 5-1/2" completion assy w/tail @ 8780' & pkr @ 8692' & SSSV @ 2097' Tstd hanger and packoffs to 5000 psi - ok. ND BOPE. NU tree & tstd to 5~)00 psi - ok. Displaced well to diesel. Dropped ball & set pkr. Secured well & released rig @ 2000 hrs, 01/06/84. DRN/DH53' tw ARCO Alaska, Inc. Post Office B"--h~.60 Anchorage, A._.,ka 99510 Teiephone 907 277 5637 January 19, 1984 Reference: Arco Open Hole Finals D.S. 14-36 12-31-83 12-3 [-83 12-31-83 12-31-83 12-31-83 WEL BHCS DILL CDL CDL/CNL 5" GO Run 1 2" & 5" Run 1 2" & 5" Run 1 2" & 5" Run 1 2" & 5" se sign and return the attached copy as receipt of data. Kelly McFar!and ATO-1429F Trans. # 023 D & M- Dallas Drilling ~Exxon -Getty Marathon Mobil DISTP~IBUTION North Geology ~ R&D Caroline Smith ARCO A;ask~':. !nc. ~5 & S~;t'-cic:ar~ ol At:an~.icR~cr, iie:cC--'- z--'-'' ARCO Alaska, Inc. Post Office r"'"-~ 360 Anchorage ..... ska 99510 Telephone 907 277 5637 January 19, 1984 Reference: ARCO Magnetic Tapes w/Listings D.S. 2-10--~ 11-6-83 CN/MSN #1861 DA -'~-~ :~ :/ ?-:7 ;.' --- /~- '-'- :.-../_i: . _ ~- D ;S-W9ni~~12'J~"8~3 .... dN¢~'SN #1886 DA GO --D;~'~5;I2~"I';I2:84 --' CH CNL #228638 --~."S'7 2-6 ~ ..... ~-]~=84 ......... ~B'C~ #228635 w/LLs~8 ......... GO D.S. 7'14 1-12-84 CH C~ ~,228636'w/i~s't'~ng GO D,S, ~5-2 ~ ~-~-84 C~ C~ #228633 wll~s~8 ~ ~ 5.~.:..A,L-~:~.,; :~ L~L-.~. ~ .L~: ......'...-' .' ... ~]} 2-1~;1-i1'84 ....... e~ C~ #228~3'4 ~/listing GO ~~~I'4-~-I~'I-2:1x83 TDT Edit #68838 W/listing ~D.S. 3-25~"~-.28,83 "-0~#68848 w}~s~8 - ' ~ ~S::~w~~-12-1-83 TDT ~nswer #68839 w/listing Run 1 Sch Run 1 Sch Run 1 Sch D.S. 6-11~ .... -12-21-83 CH CNL #68871 w/listing Run 3 Sch ~.s. 4-11~- 12-5-83 c~/~s~ ~>18'8'i'"~-I~'L:~-~h"~' ........... ~~. ! q .-.:': - L" -: ':": .: :>-:' ' l:- :- :::, 7- · --' -,:' :- Please sign and return the attached copy as receipt of~data. Kelly McFarland ATO-1429F Trans. # 019 DISTRIBUTION Chevro~ D&M Dallas Drilling ~xxon,U~ Getty Marathon Mobil North Geology Phillips Prudhoe Bay R & D Sohio ARCO A~aska !mr. 5 a S~_-.c:ar', ..~ ~'~:.~nticR;cbf,P-r_ . . ~,~ STATE OF ALASKA ,-- MONT LY REPORT OF DRILLING AND WORKOVER OPERATION 1. Drilling wellX~ Workover operation [~ 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 83-163 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21039 4. Location of Well 9. Unit or Lease Name atsurface 2083' FNL, 1055' FEL, Sec. 9, T10N, R14E, UN Prudhoe Bay Unit 10. Well No. 14-36 11. Field and Pool Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oi 1 Poe 1 RKB 73' ADL 28312 For the Month of December ,1983 .12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks , Spudded well ~ 0100 hrs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran, crated & tested 13-3/8" csg, Drld 12-1/4" hole to 9081'. Ran, crated & tested 9-5/8" csg. Drld 8-1/2" hole to 9565'. Arctic packed 9-5/8" x 13-3/8" annulus. OH logs, as of 12/31/83. SEE DRILLING HISTORY 13. Casing or liner run and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40 weld conductor set ~ 80'. Quantities of Poleset u~ed N/A yet. 13-3/8", 72.0#/ft, L-80 BTC csg w/FS @ 2678'. Cmtd w/2000 sxs "Fondu" + 400 sxs PF "C". 9-5/8", 47.0#/ft, L-80 BTC esg w/FS ~ 9066'. Cmtd w/500 sxs "G" cmt + 300 sxs CS I, SEE DRILLING HISTORY 14. Coring resume and brief description NONE 15. Logs run and depth where run N/A . REC iV[D 16. DST data, perforating data, shows of H25, miscellaneous data NONE Ala~! Oil & Ga~ Cons. SIGNED17' I hereby__~.L,certify~_ ' ~ ~/-~f-~v-~.that .... '~h~ foregoing/ is true and correct tOTiTLEthe best Area°f my knowledge.Dri l 1 i ng Engi neer DATE .] /,~ '' I ! NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 DRN/MR54 Submit in duplicate DS 14-36 DRILLING HISTORY NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran 69 jts 13-3/8" 72#/ft, w/FS @ 2678'. Cmtd 13-3/8" csg w/2000 sxs Fondu + 400 sxs PF "C". ND 20" hydril. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Frld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to 9081'. Ran 226 jts 9-5/8" 47#, w/FS @ 9066'. Cmtd 9-5/8" csg t/500 sxs "G" cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 12.0 ppg. Drld 8-1/2" hole to 9565' (12/20/83). Arctic packed 9-5/8" x 13-3/8" annulus w/300 sxs CS I + 128 bbl A.P. Ran DIL/BHCS/SP/GR as of 12/31/83. DRN/DH48'tw RECEIVED 'JAN I Oil & Gas Con~ gulltl~i~c~jr,,, <- M E'MOR -,NDUM of AI~&S~A OIL A~D GAS CONSERVATIOI~ CO~..,~ISSIOf.T ~...~t~ TO: C. ~. Ch n ~ Chai~an~~ / THRU: Lonnie C. Smith ~ Co~issioner TELEPHONE NO: Alaska DATE: December 28, 1983 FILE NO: 2 I. 7 Petroleum Inspector SUBJECT: Witness BOPE Test on ARCO Alaska, Inc. , Well ~o. 14-36, PBU, Sec. 9, TllN,R14E,~f, Permit ~?o.'83-!63. !'7ednesdav, December 21, 1983: I left Conoco's Milne Point M-l, Subj'e'ct ~f JhO'ther r~POrt, to ARCO's Well ~]o. 14-36 P.B.U. to witness a BOPE test. I witnessed the BOPE test on ARCO's l~Te!! ~o. 14-36. There were no failures. I filled out an A.O.G.C.C. report which is attached. In s~mary, I ~itnessed the BOPE test on Parker Rig 176, for ARCO on Well No. 14-36. I*~en the BOPE tests were completed they were satisfactorily performed. Attachment %&G? #4 4/80 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Inspector Well Location: Sec Drilling Contractor /3~/~/fL~C/~. Rig # /?~ Representative ~7{'~/C~,~L,-j-f ~,- /3/c/7'A,-_-/~.~'C3/j' Permit ~ ~ --/~ t~asing Set ~ ~67~' ft. Representativ~ ~~ /~~/~-~ Location, General Well Sign. General Housekeeping . Reserve pit ~/~ Rig ~/~ BOPE Stack Annular Preventer Pipe Rams Blind Rams Choke Line Valves H.C.R. Valve Kill Line Valves Check Valve Test Pres sure ACCUMULATOR SYSTEM Full Charge Pressure ~ ~&3 ~P psig Pressure After Closure /:f-~ psig 200 psig Above Precharge Attained: ~- Full Charge Pressure Attained: ~ Controls: Master ~/~ Remote d~/~ Blinds .switch cover¢~/~ Kelly and Floor Safety Valves Upper Kelly. Lower Kelly Bal 1 Type Inside BOP Choke Manifold No. Valves ~ _~- · NO. flanges. ~ ~ ¸~ Test Pressure Test Pressure,., Test Pressure Test Pres sure Test Pressure_3~ Adjustable Chokes ~A~C Hydrauically operated choke Test Results: Failures ~/~/~c Test Time ~ hrs. min ,~d~ sec. min 3 ~ sec. Repair or Replacement of failed equipment to be made within Inspector/Commission office notified. Remarks: / ------ days and . Distribution orig. - A0&GCC cc - Operator cc - Supervisor inspector ~ovember 9, 1983 Mr. D. S. Smiley Area Drilling Engineer AR~CO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Re: Prudhoe Bay Unit DS 14-36 ARCO Alaska, Inc. Permit No, 83-163 SUr. Loc. 2083'F~, 1055'FEL, Sec. 9, T10N, R14E, U~. Btmhole Loc. 2444'FSL, 2491'FWL, Sec. 9, T10N, R14E. Dear ~. Major Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one' cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity ~urveys and dipmeter surveys~ Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05,870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any ~aters of the State ia prohibited by AS 46, C~apter ~ Article 7 and the regulations promulKated thereunder (~ttl~ lu Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to c~_encing operations you may be contacted by'a representative of the Department of Enviro~ental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout Mark A. Major Prudhoe Bay Unit DS 14-36 -2- November 9, 1983 prevention equipment so that a representative of the Co~ission may be present to witness testing of the equipment before the surface casing shoe is drilled. ~ere a diverter symtem is required, please also notify this office 24 hours prior to c~m~ncing equipment tn~tal!ation ~o that the Commission may witness testing before drilling below the shoe of the conductor pipe. in the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witnes~ present. Very truly .yo_ur~, . C. V. Chatterton ~ Q~D~ O~2 .~'~ GQ~]~.~S~C~N Chai~an of Alas~aO~. and qa~ Conservation Commission be~6~H/A Enclosure cc: Department of Fish & Gm-e, ~abitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc. Post Office B~., 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 4, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' DS 14-36, Permit to Drill Dear Mr. Chatterton' Enclosed is our application for Permit to Drill DS 14-36 and the required $100 filing fee. Attachments to the application include a plat detailing the section and plan views of the proposed wellbore; a proximity plat; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we anticipate spudding this well on November 17, 1983, your earliest~ approval will be appreciated. If you have any questions, please call me at 263-4610. Sincerely, D. S. Smile~~ Area Drilling Engineer DSS/JG4L84-tw Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA IjiL AND GAS CONSERVATION CO,,,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. 2. Name of operator DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL [] DEVELOPMENT GAS [] ARCO Alaska, Inc. 3. Address SERVICE [~X STRATIGRAPHIC I--I SINGLE ZON E,~X ..,.~ ~ '~ , ~. Umt or lease name ~ .~ ".~ Prudhoe Bay Unit ~ '~, 10. Well number ~. 14-36 11. Field and pool P. O. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 2083' FNL,1055' FEL, Sec. 9, T10N, R14E, UH(Approximate) At top of proposed producing interval 2496' FSL, 2611' FWL, Sec. 9~ T10N~ R14E, UN At total depth 2444' FSL, 2491' FWL, Sec. 9, TION, R14E, UM 5. Elevation in feet (indicate KB, DF etc.) ] 6. Lease designation and serial no. 73' RKB I ADL 28312 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Prudhoe Bay Field Prudhoe Bay Oil Pool Amount $500,000 13. Distance and direction from nearest town 5 mi, NE of Deadhorse 16. Proposed depth (MD & TVD) 9581 'MD, 9231'TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 4000 feet. 21 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed well feet 18. Approximate spuc cate 11/17/83 m il es feet 246!' ~ TD fr/^DL 283!~. 17. Number of acres in lease feet 2560 20. Anticipated pressures MAXIMUM HOLE ANGLE 22 ° I (see 20 AAC 25.035 (c) (2) I 3387 psig@____ Surface 4140 _psig@ 97~1 ft. TD (TVD) Proposed Casing, Liner and Cementing Program SIZE Hole I Casing ~0" 20" il 7-1/2" 13-3/8" 2-1/4" ] 9-5/8" / 8-1/2"! 7" Weight 91.5# 72# 47# 29# 22. Describe proposed program: CASING AND LINER Grade Coupling H-40 Welded L-80 BTC L-80 I BTC Length SETTING DEPTH MD TOP TVD 80' 30' I 30' 2670' 30' I 30' I 9082' 29' I 29' 770' 8811 ' 18515, D BOTTOM TV D 110'1 110' 2700' I 2700' 9111'I 8795' I 9581'! 9231' I QUANTITY OF CEMENT (include stage data) 375 sx Permafrost II 2300 sx Fondu+4OOsx PF 500 sx G 1st stage 300 sx PF 1, 2nd stage 400 sx Class "G" cement ARCO Alaska, Inc., proposes to directionally drill this well to 9581'MD (9231'TVD) to inject into the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17#, L-80 tubing, packer, and necessary provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. The packer will be set above the Sadlerochit. A separate Sundry Notice will be submitted when the well is to be perforated. A surface diverter will be used on this well. DS 14-36 will be 25' away from DS 14-8 at a depth of 3230' TVD and 129' away from DS 14-11 at a depth of 6075' TVD. There are no other wellbores anywhere down hole within 200' of the proposed DS 14-36 well course. DS 14-36 will be guided to the Southwest at approximately 1300' TVD and then monitored to try and maintain a minimum distance of 100' from the DS 14-8 wellbore prior to kickoff. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNED ~.~. TITLEArea Drilling Engineer CONDITIONS OF APPROVAL DATE Samples required Mud Icg required []YES [~O []YES ,~10 APPROVED BY~ Form 10-401 X~l~4/PD22 . Directional Survey required J APl number [~YES i--]NO J 50- C~"~ - SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE November 9, 1983 by order of the Commission Submit in triplicate LD 1200 2{00 3600 4800 6OOO 7200 8~.00 i 200 2400 3600 4800 6000 7200 ~ i .... ~ ......... L , J .[ i ' i ..... i ..... i , i , , , , , , , , ! 20 CASING TVi~ = I'JO i j i . t3-3/8' CASINGTVD=2700 (OP TVD - 4O0g , 12.5 ~ 17.5 ~(TO TAflQBe ET) AVERAGE AN~LE ~ 21 DE~ 1 MIN . 111 ._ ' LCU TVD=8~23 TMD-8282 3EP =1415 , - 9-518' C;~SING TVD -- 87~ 5 TMD -- 9111 Oi P -- 1719 SAG RIVE~ TVD -- 8805 TMD -- e122 'DEP - 1723 SHUBLIK TVD -- 8827 TMD -- 9146 DEP -- 13 32 TARGET TVD =aaTS TMD =g19E DEP =1~50 TOP SADLEROCHIT TVD ~8898 TMD =g2~2 DEP =1760 I O/W CONTACT TVD = 9092 TMD = ~431 IDEP = 1B35 ~-. ~ - ~ COOROINBTES -5000 -4000 ~5000 -2000 -1000 O 1000 2000 ~':':':':':':': =========================== ~¢:i:}:i: ~::::::::: ::::::::: i-;.i-;.;.;.i 'iDiSii' . ......... : ;:;:;:;:;:;:; -:-:-:-:-:-:-:-:-:-':::::::: ......... . ::::::::: -i.i.i.i.i.i.i.i. -:-:-:-:-. .............................. -:-:-:-:-:-:-:-:- ':':':':':':': ' TARGET .................................... ............. TVD=8873 ' ........ .i .................................... .:-:.:-:-:.:.' MD~ 9~ 95 ' ................................... · .............. I o,,,..,, ,o..,..,. .,,.,o,,. .,,,...,,, BEP*[750' ............................................ ~ ....... SOUTH 697~ ................................... !:.:.:.:.:.:.:.:.: -i-i-i-i-i-i-i WEST 1605' ::: ::::: :::::::7: ::::::::: :::::::':: ii-' ....... ................ ' ................................. :'2'~-~'~'~'r-2-r~ ' ' 'o~ -:-~-:-~-~-r-r-2 .:.:.:.:.:.:.: ::::::::: ::::::::: :::;::::: 1055' ........ . , ...... ,.,',,., ........ o.. ':'~':-:-:';': .................. - ............. :::::;:::::::; .................. ~.~.~.~.~ .... -!-i-!-i-!-!-! :-:-:-:-:-:-~-:-:-:-:-:-:-:-:-:-:-:-:- ' .... ~' ....... o'. ..... '' '.'...... .... ...... ~V~V ,. :!:!:!:!:!:i:~ :-:-:.:-:-:-:-:-:. :-~-i-i~.i.i-i.i. . .... ::::: ...... 'i';'i'i'~';'i' '.;.;.;.;.;.~ ........... .;.;.;.;.;.;.;.;. ' .............................. ......................... ' .......... '' ":":':':':':' ' ................ ......................... '~'~'~'~'~ ':-t'~':'. ..................... ....... ~'~'~':'2'~'~'~'~' , '~'~'t'~'~':'~' '~'~'~':'~ ~'~'~'~'~'~'~'~'. .................. · ':':':':':': ......... 2500' ..... -i :-:-:-:-:-:-:-:-:- ' ......... .... ' .............. :i:i:i SHL: 2083;FNL, 1055' FEL, Sec ......... ~ ......... I ......... I~: ........ ~-.-.-:-~-~-~ ~-~-~-~-~-~-~-~-~ ......... , . . - ..... . ....... ' .................. '~ .... THL' 2500'FSL, 2620'FWL, Sec 9 T10N, R14E, .:.:.:.:.:.:.:.~.:..:.:.:.:.:.:.:.:.:. .............................. :i:!:i:!:!:!:!:!:; -!-i-i-i-i-i-i-i-i-,-i-i-!-i.i-i-i-i-i-!-i-i-i-i-i-i-i-!-i--' ................. :::::::::' .;.!.:.:.:.:.:.:.:.:.:.L.:.;.:.:.:.;.;.;.;..;.;.:.;.:.;.;.:.:.I.;.:.;.;.;.:.:.; .... ;.;.;.;.;.~:~:.~.;.~;.;i:;.::;;.;.;.;.:. i,,~,,,, · : ''' ;' ' ;''l' ;;';'; ;; ; ' ; ; ;; ;; ;; ;; ;;~;;;;ii:'''; ; , | I , , . , , ' ' I ' ' ' ' ' ' ' ' ' ' ' ' ' i ' ' I ' ; ' ' ' -5000 -~O00 -3000 -2000 -i.000 0 ::'! ':'~-~;~' :"1000~'' ~;:":~':;~;"~ ;~000 E - N CooRn*~'~TFq~,~,,,, _~ ......... ' -5000 E - IA COOROINFITE -'~000 -3000 -2000 - 1000 0 1000 2000 W 0 · Z [ Iil]llJ ! IiIiiiiii tllllllll Illllllll lilllliiJ IIIIIIIII .lllllllJ ''~'~';'~";'~'~ ;':'";'~'~':':';':';';' ';'~':'"~'~'~'":"'i':'~'": ................... ;"'; ........................ ]; ........... ; ..... ............................................. ~ ....... : .......... ~...~.;.;.;.,.~.;.;.~...~...;.;..:.~.~.;.~.;.;.;.;. ..;.;.~.~.~...~.~. ~:~:[:~:!:i:i:i [:~: :~:[:[: " ':......................................................................... ......... ''t':':'t':':':'":' ':-t-:'t-:-:':-:-:-':-:-:-:'t't-:-:-:--:':-:':':-:'t-t't' ':':':':-:':'t':'t'":':':':':-:'t':':- ' °~'~'~'~'~'~'~'"~'"~'~'~'~'~'~'~'~' '~'~'~'~'~'~'t'~';' '~';'~'~'~';'~'~'~' '~'~'~'~'~'~'~'~'~'"~'~'~'~'~'~'~';'~' ~';';'~'~'~'~'~'~' ';';';';';';';'";' ';'~';'~'~';'~°;'t' ';'~';';'~';'t';'t' ';';'~';'~';'~'~'~'i'~';'~-t'~-;';-;';-";-;-~-~';-~-t';-;- ;-;-;-~-~-;-~-~-;- i~'~'~ ......................................................... ============================================================= :!:i:!:i:!:i:!:i:!: :!:i:i:!:i:i:!:!:i:iZi:!:!:!:i:i:!;!Z!: , . ............... -,-''''''',,-' .:.:.:-:.:.:.:.:.:.:.:.:-:-:.:.:-:.:.:.l.:.:.:.:.:.:.:.:.:. ',,,,,,. --------- ---------~ ........ :::::'::: '::i:i:i:i:[:i:i ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :[:r:[:r:[:[:~:~:i: ::::::::::::::::::::: '":°;";':'t';°:' -;-i ...................................................... -.oi.i-ioi.i-i-i '- ......... "i:i:i:i:i:;:!:i:i:::i:i:i:i:i:i:i:i:i:;:i:ii:¢~_~,::~gei'i'~'i'!' ";';'Y'Y'Y';'Y ......... i-i-i.i-~.i-i.!-i..-i.i.i-i-i-i-i-i.i..-i-i-~-,-~-Z-L, ~;~[:i:5:[:: - . ........ . ........ ~.-.~.-S~ ~0~ , , ................ ~ ........... 5,, ,-..-.. -~-i-i-~-i-i-~! ,-~--i-i-i-~ :-~,~S~-~-i-i-~-i-i-,-~-i-~-i-~-i-~-i-~--i-~.~.~-~-~.' -= 3~i.~.i.i.i-i- i-~.'.~253!. :5:[:5:[:[:i:5~ :[: :5:i:[:[:i:5:[:i:5: ::[:r:[:~:[:!:i:z:!: ::;:i:[:r:r:r:i:r:[: ::i:r:r:r:;:~:;:~:s: :~:r:r:~:r:r:z:~:~:: -,-::::::: .i..i.i.i°i-i.!.i.i.i...i.i.i.!.i.!.i.i.!...i.i.i.i.i.i.i.!.i.~.!.!.!.!.i.i.i.!.!...!.i.!.i.i.!.~.i.i.~!.!.!.!.!.!5.~.. :::i:i:i:i:i:i:i i:i: :i:i:i:i:i:!:!:i:!:::!:i:i:!:i:i:i.!:i.::!.i:i.i:!.i:~.i:i.::i.~:~.i:~.~:~:i:i.::i.i:i.i:i:!:i:~:i: i:i:i:i:i:i:i.'::'.~ .................. ~ ....... '..': .'t ,', .'r .'r ,' ,', .'..' .... ' .'J .'.. r ............ ~.i.¢.i.~.i.i.i~..i...i.¢.i.~.i.i.i.i.i..!.i.!.i.i.¢.i.(.i..i.!.i.i.i.i.i.i.i..i.i.i.i.i.!.i.i.i..i.i.i.i.i.i.i.i.i- i-i-i-i-i-i-i-i-i- ~.:.:.:.:.:.:.:..:...:.:.:.:.:.:.:.:.:.I.:.:.:.:.:.:.:.:.:.~.:.:.:.:.:-:.:.:.:..:.:.:.:.:.:.:.:.:..:.:.:.:.:.:.:.:.:. ..:.:.:.:.:.:.:...:...:.~.!.~.!.;.!.[.?.[.;.;.:.;.;.!.7.!.;...:.:.:.:.:-:.:.:.:..~.[.!.:.!.:.!.;.;..:.:.:.:.:.:.:.:.:. ' ..,.,.,.,.,.,.,,.,..,.,.,.,.,.,.,.,...,.,.....,.,...,.... .~.i.!.i.i.~.~.i~.i.'.i.i.i.!.i.i.i.i.i...i.i.i.!.~.i.i.i.i...i.i.i.i.i.i.i.i.i.~.i.i.i.i.i.i.i.i.i...i.i.i.i.i.i.i.i.iI._.... ......... :':i:i:[:i:i:[:i :i: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: -5000 -4:000 -3000 -2000 - lO00 0 "'; "',.1'0'00 ' 2000 E - N COORDINFtTES ,. , ., ; ;: NCrrF~. WELL PATHS EXTEND BEYOND VIEWING WINDOW. D S 14- - $6 - 1,',1 COl]RD I NFITF':S - 1000 -900 -800 -700 -600 -500 -dO0 -300 I i i i i i I I I I i i I i i i i i i i i i i i I i, i i i i i i i I I I I I I I I I I I I I I I I I I i I i i i I i I I I I ~ ~399 5295 6 ~,5843 · ~378 /706~~ 5761 ~78~ ~s947 ~261 7008 ~ 5285 ~ 6591 ~' ': [~', Jtq~ .,.~.: '~.'~.'~f~f~.'., ~, ", i i i I i i i i i i i i i i i i i i i i i i i i ~ i i i I i i i i i i i i i i i i i i ; i '1 i i-i i i i i i i i i i i i i i i i i.-,.i I z - 1000 -900 -800 -700 -600 -500 ...... "- -~tO0 -300 g - N COORDINFITES ANNULAR PREVENTER ~DSILLIN6~~'~ 13-5/8' BOP STACK OIAGRAM Accumulator Caoacity .Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1SO0 psi downstream of the regulator. 3. Observe time, then close all units simultane- ously and record the time and pressure remaining after all units are closed with charging p~mm~ off. 4. Record on IADC report, (The accemtable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8' BOP Stack Test 1. Fill BOP stack and manifold with a non-freezing liquid. 2. Check that all hold down screws are fully rmtract~d. Mark running Joint with predeter- mined plug seating depth. Run test plug on drill pipe and seat in wellheaa, Run in lock down sCreWs. 3. Close annular preventer and chokes and bypass valves on manifold. 4. In each of the following tests, First hold a 250 psi low pressure test for a minimum of 3~ minutes, then test at the high pressure. 5. Increase presure to 3000 psi and hold For minim~m~ of 3 minutes. 8lead pressure to zero. 6. Open annular preventer and close top set of pipe rams. Increase pressure to 5000 psi and hold For at least 3 minutes. 8lead pres- sure to zero. 7. ClJse valves directly upstream of chokes open chokes. Increase pressure to ~000 psi & hold for at least 3 minutes. Bleed pressure to zero. 8, O;en top set of pipe rams then close bottom set of pipe rams. Increase pressure to ~000 psi below the bottom set of pipe rams and hold For at least 3 minutes. g. Test remaining untested manifold valves (if any) with SO00 psi upstream of valve and zero pressure downstream. ~0. Bleed pressure to zero. Open bottom set of pi;e rams. ~1. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi For at least 3 minutes. ~2. Bleea pressure off all equimnent. Open blind rams. MaRe sure manifold and lines are full of non-(r~ezin~ liquid and all valves are set in drilling position. ~3. Test standDipe valves to ~000 psi. 1¢. Test Kelly cocks and inside BOP to 5000 ~si with Koomey ~5. Chec~ o;eration of Degasser. 16. Record test information on blowout ~reventer test form. Sign and send to Drilling Super- visor. 17. Perform complete 8OPE test once a week and functionally operate BOPE daily. 35 Rev. '' ~/13/8~ . . ~.:.: '~': , SURFACE HOLE D ]'VERTER ARCO 'ALASKA SYSTEM INC'. SCHEMATIC IO" HYD. OPR. BALL VALVE ~WELL BORE ./ /~-----IO" HYD. OPR. BALL VALVE // // // I ALL 90* TURNS ARE "TEE"  ] CUSHION I RESERVE AREA I I I I WELL Q BORE I I NOTE' , I I I t I I ' I FLOWL INE DRILLING RISER , F 20" 2OOO PSI WP ANNULAR PRE VENTOR "'"' I Valves on diverter lines open automati- cally when the annular preventer is closed. 20" CONDUCTOR PIPE / I O" HYDRAULIC OPERATED BALL VALVES "DETAIL" 202601020: ARCO Alaska, Inc. ' Post Office Bo^ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 October 31, 1983 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built Location Dear Elaine' Enclosed is If you have Sincerely, J. Gruber Associate Engineer an as-built location plat for any questions, please call me JGRUS/L19'tw Enclosure Plat - DS 14 - Wells:36-37 the subject wells. at 263-4944. ARCO Alaska, inc. is a Subsidiary of AllanticRichfieldCompany D.S. 14 EAST PAD 4 9 , VICINITY MAP TION~,,~ R 14oE U.M. I 4 O0 °~ ASBUILT LOCATIONS WELL ~6 Y=59~8260.8~4 X = 6754;58.3:56 LAT · ?0~14'1 ~.10 6" LON 4i= 148e:~5' 00.188' N.W. ¢OR. CELLAR BOX ELEV. z42.3' WELLI137 Y=B9;~BI44.061 PROTRACTE:D RI4E, SEC 9, TION, X = 675465.921 LAT = 70*14'11.951 I;OH G · 148e34'5 9.'1~5 ~N..W, COR. C£Lt. AR BOX EL~V.,41.9' :~ fY8~'~'?~OORDS ASP ZONE ~ ~.,~; -:,..; . , "~'~';~;~ 0,"/ · ,. ' ' '"' '-~'&S' ~: ~. /j ~-'/lf' , . I HEREBY CERTIFY THAT I HAVE MADE A SUI:~'~E¥9'~i "~"J'",";;4, OF T~ ABOVE DE~ED PROPERTY AND THAT ~E ~OVEMENT8 81TUATED THEREON ARE WITHIN THE BOUNDerS OF SA~ TRACT ANO DO ~T O~ ~ ~OACH ON THE ~ERTY LY~ A~ACENT T~~O, EXC~T A8 ~ICATED ~ SE~B~RT-' ' HEREON. MONUMENTATiON REPRESENTING NC.~;2-S ..'~ ~ BO~~ CON~~ BY PLAT tS ~WN ~ "~ ~~ ~ ~ A~TE TO THE BEST ~ MY ~ ~WLEGE ARCO D.S. 14 WELL 36-37. A$BUILT I II I 0il and Gas Company Dlvt~oa of Atlantic Richfield Company .......... ...... -.---.-,~.,---.- . -,.-,..,.,,,,-,- ,-, ,,, CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. . ,ii.!~'" ITEM APPROVE DATE (1) Fee (2) Loc (3) Adrnin [,/L,.j..,%,. ......... thru 11) (4) Casg ~~-~/~]/~ (12 thru 20) (21 thru 24) YES NO 1 Is the permit fee attached 2. Is well to be located in a defined pool ............................ 3. Is well located proper distance from property line................~.__. .~.,,.~ 4. Is well located proper distance from other wells 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ............ · · · ,' 7 Is operator the only affected party ......... ;;it ~]~]]]]] ]]]]~]]] (.'"' "~, 9. Does operator have a bond in force .................................. "~ 10. Is a conservation order needed ...................................... 11. Is administrative approval needed ....................................... ' 13. Is enough cement used to circulate on conductor and surface ...... ~. ,., 14. Will cement tie in surface and intermediate or production strings 15. Will cement cover all known productive .horizons ................... 16. Will surface casing protect fresh water zones .................... ;1 17. Will all casing give adequate safety in collapse, tension and burs 18. Is this well to be kicked off from an existing wellbore ............. ~ · 19. Is old wellbore abandonment procedure included on 10-403 ............ 20. Is adequate well bore separation proposed ........................... ~ " , ,, · 21. 22. 23. 24. 25. REMARKS Is a diverter system required . · Are necessary diagrams of diver;;;';;~'~;;';;gl;~;;;';;;;g~;~ ~~ " Does BOPE have sufficient pressure rating -Test to ~-~ psig'' . Does the choke manifold comply w/API RP-53 (Feb.78) .................. /~ ~tfgJ~l · Additional requirements ............................................. · Additional Remarks: ~J~2.2. /~/-~ Geology: Engi.n~er~i- ng: ', WVA ..~ JKT ---HJH .~-/] J AL~_(..,::. ~';-. ~_._,,_ MTM ~- rev: 12/06/82 - INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effod has been made to chronologically organize this category of information. DIR'ECT DIGITAL LOGGING C'OPiPUT E,R P~ROCES'S.ED A'N A,LYSIS Company ARCO. ALASKA INC, Wel 1 i)S ! 4-:36 Field PRUDHOE BAY Count~ .... NORTH SLOPE State ALASKA ...~_, ~._,J.~, ,~, .i ,,, , ~- - CLIENT F 0 R'M',AT DATA TAP'E LOG I HF 0 RM A"T"I ON STANDARD FO~RMAT < L, I', $, ) No,: ARCO' ~4-J6 Depthz: 90~, 0,0 to 9570, O0 Name:; DS 14-3'6 Field: PRUDHOE,B~Y, Date: 20 FEB, ai..l~84 Time: 2:43 PI'! I'ION, L, I, S i TAPE RECORDS REEL HEADER *********************** Service name: &C=SF01 Previous reel: HEADER RECORDS Date: 84/02/20 Commente: Origin: Real name: 123183 Page Continuation #: 01 ************************ TAPE HEADER Service name: &GSF01 Previouz tape: Date: 84/02/20 Commentz: Origin: Tape name: 123183 Continuation #: 01 mmmmmmmm,mmmmm FILE HEADER *********************** File name; &G5F01,001 Maximum l~ngth: 1024. Service name: HEADER RECORDS Version #: File type: LO Previous ¢ile: Date: Page HN£H CH WN FN COUN STAT CTRY SECT TOWN RANG EKB EDF EGL PO LMF DNF RUN LOC SON LUN FL LUL EHGI WITN DL TLI CS TLAB BHT MRT HT MSS NVlS RM RMF MFST MFSS RMC NeST MCSS I NFORMAT I ON RECORDS CONTENTS ARCOiALASKA IRC .... ' ............. O~ 14-~6 .,.,,,,,,,,,,~,., PRUDNOE BAY ............... NORTH SLOPE .,...,,. ..... , ..... ,,' ................ ALASKA ,.. .... ' ......... ,..,,.'... ......... .,.. USA ....... ,,.,,,, ........ ,, ,,,, ,,, .... 9 1 I i i i # t i i i s I i i I: $ i i I i i I i i i: l i I i i i i i i I I i I I i i: i i: i i i t I i I i I I 1 ON I 1' , I , , ........ ; I I' I I I I ....... , , ...... , , I , i~,~I , ....... , I I 14£,..,,.,.,,,,,,.,,.,, ,,.,,,..,o..,,.,,,,,,.,,.,,,..,,,,, 69,000 ........ ,.,~,, ....... , ........... ..... ~,,:,,. .... ,,,, ~e. O00 ............... 39,000 ............... KB .............. . .... lllIIImIIIllIalmllI. II NORTH SLOPE . NORTH SLOPE , WAITE , LAUE , 9565.000 .......... , . 9551,000 ......... . 9060,000 ............ 9547,000 ......... .., , 20.30,000 ............ 1200,000 ............ 190,000.., ......... 190.000 ............. LIGN FLOWLIHE .38. 000 ....... 1.400 ........ ! ,600 ........ 59,000 ....... MEAS , 1,400 ........ 61,000 ....... MEAS . I IIIISlI IIllIII IIIIlIl IIIIIII IISIISl IIeII'lI IlIIllI IIIlIII IIlIIIIIIlIliIIIIIII~III, IiIIIIIIII IIlIIgIIiIIlIlIlllIlI'llilIIIIIIIl IIl'IIIIIIIlIIIlIIIII~III'lIIlIIlIII IlIlIIIIlItllIIIlIlItlllIlIIIllIt IlllI'IItIIlIlIIIlIIIIIlIIIIIlIIII IIlIIIIlIIIIIlIIIIII, IIlIIIIlIlIIl IlIIIlIlIlIlIlIIlIlIIIlIIIlIIIllI iIIII:IlllIIIIIIIIlII~IIi'II'IIilIilI IIIII;lI, IlIIlIIiIlIIl:llIIllIIlIIIl IIIIIII, IIIIIl. IIIIIIIIlIlIIIaIIIII IIIIl'II, IIIIIIIIllIIIIllIIllIIIllI IlIIIIl~IIIIIlIlItIII:IIIIllIiIIlII IIIlIIIIIIIlIlIIIlII, IlIIlIIIlII'III IliII~IIllIIIIIlIlIIIIIiIII'IIIIIII IIIllIlIlIIIIIIIIIII. I, IlIIIlIIIIII IIIlIIIIIIlIlIIIlllIIIIIIlIlIIIII iIIlI:II. IlIIIIlIlIiIIlIIIIIIllllll IIIIIItIIIIIIllIIIlIIIItlIIIIIIll IlliIlillIliIlIIiIIIrIlIlIIiIIIlI iiIilII. IIIiIiiIIiiiIrIIIIIIIIIIII IIIiIilIilIlIlIiIIlIIlIIlIlIlIlII IlIiIllIIIiIIIIllIIl. llIIIIIIIlill IIliIIIIIiIIIllliiIiIlIIlIlIIIlII IiIIiIiIlliilIIIIIIiiaIIIIIlIiIII IIIIIllllIIIIIIIIlIl. IlIIllIiIIlII iiIiIiIIllliiIIilIii'iiiIiiIiIliii IIIiIIlIIliIlIIllIIIlIIIIIIlIlIII iiiiiii:lIIIiiIIiliiIlIliIiIliIIlI IIlIlIIiIIiiIIaIlIIII'IIlIIlIIIllI IIiIiliIIlIIiiIIIlIliIIlIIlIIilII UNIT TYPE 'CAT~' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FT 0 FT 0 FT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FT 0 FT 0 FT 0 FT 0 HR 0 HR 0 4 DEGF 0 1 DEGF 0 1 0 2 0 2 CP 0 2 OHMM 0 2 OHMM 0 2 DEGF 0 2 0 2 OHMH 0 2 DEGF 0 2 0 2 SIZE CODE 40 65 40 65 40 65 20 65 20 65 20 65 2 65 3 65 4 68, 4 68 4 68 2 65 2 65 2 65 2 79 2 79 10 65 1 0 65 20 65 20 65 20 65 20 65 4 68 4 68 4 6~ 4 68 4 68 4 68 4 68 20 65 20 65 4 68 4 68 4 68 4 68 12 65 4 68 4 68 12 65 .Pag~ COMMENT RECORDS This LIS'tape was written by Gearhart Industrie$.Wireline All curve and tool.mnemonics'used are those which most closely match Gearhart'curve and',tool'mnemonics, GEARHART TO SGHLUMBERGER MNEM SERVICE UNIT MNEM SERVICE" UNIT DEPTH FEET DEPT FT TEN DIL/BC$ MY TENS DILBC$ MV SP DIL/BC~ MV SP DILBC$ MV GR DIL?BCS GAPI QR DILBGS ~API ILD DIL/BCS OHMM ILD DILBGS OHMM ILM DIL?BC$ ONMM ILM DILBGS OHNM LL3 DIL?BCS ORMM LLSU DILBCS OHNM DELT DIL/BGS US?F DT DILBCS U$/F AMPS DIL?BCS NV AMPL DILBOS MY GILD DIL/BOS MMHO GILD DILB~S MMHO Pag~ DATA ENTRY BLOCKS ENTRY ENTRY BLOCK LEGEHD' TYPE DESCRIPTION ~m ~m~m~ 0 Terminator ( no more entries ) FORMAT SPECIFICATIONS TYPE SIZE CODE 0 1 66 Page 6 DATA FORHAT SPECIFICATIONS · ** DATUH SPECIFICATION BLOCKS SERVICE SERVICE API API API API FILE ID ORDER # UNIT LOG TYPE CLASS MOD # mmmm' mmmmm m~m mmmm DEPT 123183 TENS DILBCS 123183 SP DILBCS 1231813 GE DILBCS 12318~ ILD DILBC$ 123183 ILH ~ILBC8 123183 LLSU DILBCS 123183 DT DILBCS 123183 AHPL DILBCS 123183 CILD DILBCS 123183 FT' 0 0 0 0 0 HV 0 0 0 0 0 HV 0 1 0 0 0 GAPI 0 31 0 0 0 OHMM 0 12 46 0 0 OHMH 0 12 44 0 0 OHMN 0 22 8 0 0 US/F 0 52 32 0 0 MV 0 53 3 0 0 HMNO 0 68 46 0 0 PRC # SIZE LYL SMPL RC mmmmm mmm ~mmm ~ 4 0 1 68 4 0 I 68 4 0 1 68 4 0 1 68 4 0 ! 68 4 0 1 68 4 0 ! 68 4 0 1 68 4 0 1 68 4 0 1 68 PROCESS INDICATORS mmmmmmm'mmmmmm~mmmm 000000 0"000'00 000000 000000 000000 000000 000000 ,000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 00.0000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page DATA RECORDS DEPT TENS SP" GR ILD ILM AMPL CILD 9~63,~00 0,000 0,000 0,000 1,000 ~********* 0,000 100:0,000 9463,§00 390,0.00 20.600 21,900 2,'95J 3,467 108,000 3.38,844 9.363,500 346,000 50,8:00 78.600 7.'656 8,356 114,000 130.617 9263. 500 287,000 12.90'0 27.1 O0 24.660 21 .281 89,500 40,551 9163.500 351 . OOO 15. 700 29.700 . 726 1 .592 86.200 1377.210 906.3.500 268. Ooo 66. 700 70.900 2.951 14.2'23 70.700 338.044 Pag,s: 8 LLSU DT 1,000 0,000 5. 117 81 . 1 O0 11,803 78. O0'O 22. 182 84.600 !6. 032 1 00,800 12.853 80.00'0 FILE TRAILER File name: ~G5F01.001 Maximum length; 1024 TRAILER RECORDS Se'rvice',,nam¢: Version'#: File,type: LO Next FILE HEADER ~m~~~~~ File name: &GSF01,002 Maximum length: 1 024 I HEADER RECORDS File type~ LO Version'#: Pr~vi'ouz Dat~: Pag~ 10 CN WN FN COUN STAT CTRY SECT TOWN RANG EKB EDF EGL PD LPIF DI'IF RUN LCC SON LUN FL LUL ENGI WITN DD DL TLI BLI TCS TLAB BHT MRT lit RMF MFST HCSS coNTENTS ARCO i ALASKA INC, DS 14-36 PRUDHOE BAY NORTH SLOPE ,. ALASKA ,. USA ,, 09 .......... ........,... 1ON ..... '. , , ,., , ... ..... 14E... ............... ~... 69,000 ..... , .... , . , , , . , 68.000.......... ....... 39. 000 ................ 'gL ................. .... KB ...... · ........ ...... :30 ........... ............ 7611&7612 ............ NORTH SLOPE .. NORTH SLOPE .. WAITE ,. LAUE , . 9565. 000 .......... ~ .... 9551 , 000 .............. 9060,000 .............. 9547,.000.. ...... ...... 2030,000 ........ . ...... 1200,000 ........... ,,, 190,000. , .. ............ igo.ooo ............... LIGN . , FLOWLINE . . 38. 000 ............. . . 1.400 .......... ..... 1 ,600 ............... 59.000 .............. MEA8 ........ 1.400 ............... 61 ,000 ............. , MEAS ........ INFORMATION fill'Il mmllll IIIlll llllli I11111 IIIIII t11111 IIIIII III111 IIIIII IIII11 II!$11 IIIIII IIIIII IIIIII II1'111 IIIIII IIIIII IIIII1 IIIIII III1'11 IIIIII IIIIii IIIIII IIIIII IIIIII IIIIII II1111 Illlll IIIIII III1.11 IIIIII Ill 111 lllllll~;'llrll iIiI1111~IIi~1, Iii11111~111~1 IIIIIl$ii'lill llllllll'lilll iiiiiiiiiiii Iiiiiit11111 iiiiiiiiii1'1' Iiiii1111111 iiiiiiiiiiii IIIII1111111 t11t1111,1111 Illlllll'lllil iiiiiiiiiii1' Iiii111111tl iiiiiiii1111 ~11IIiIIII1:1 iiiiiiii1111 iiiiiiiiiiii iiii1111'1111 Illllllll, llll iiiiii111111 IIii111111111 iii!1111.1111 iiiiiiiiiiii Iiiiiiiiiiii iiiiiiiiiiii Ilillllllllll Iiiiiii1'1111 IIiit1111111 Iiii!1111111 illllllilllll iIIilillllllll i: i I I I I II I I I II I I ! Ii i I I IIl Il I I iI I IlII I Ii Il I Il e I I I Ii I I i I i ii i i i I! I I I Ii m I I Ii I ! II I I II I I I II Il I I IiiI I I II I l i II i ! I i! ! I · Ii i I i II Il i Ii i II i II ii I II II ii II RECORDS UNIT I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I i I i i i I l ,,,,,,, F'T i e · I i i I i · I I i i 1 i I I i i · I I I I I I I I I i I I I I I i e i I i I I ....... ET ....... F'T ....... DEGF ....... DEaF a i I I i i I ....... OHMH .. ...... OHHII ....... DEGF I I I I I I i ....... OHIIH ........ DEaF i i ! · i i i 0 0 40 0 0 4O 0 0 40 0 0 20 0 0 20 0 0 20 0 13 2 0 0 3 0 0 3 0 3 4 8 3 4 0 3 4 0 3 2 0 3 2 13 3 0 0 2 0 0 2 0 O 10 0 0 10 0 0 20 O 0 20 0 0 20 0 0 20 0 3 4 0 3 4 0 3 4 0 3 4 0 2 4 0 4 4 0 1 4 0 1 4 0 2 20 0 2 20 0 2 4 0 2 4 0 2 4 0 2 4 0 2 12 0 2 4 0 2 4 0 2 12 CODE 65 65 65 65 65 65 65 65 65 60 68 65 65 65 79 79 65 65 65 65 65 65 60 60 60 60 65 65 60 65 60 65 11 COHHENT RECORDS This LIS'tape was written by G~arhart Induzteie~,Wireline Service~, All curve and tool.mnemonicz'us~d ar~ tho$~ which mo$% cloz¢ly match G~aphart'curve and,'~,tool'mn~moni,c~, GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT MNEM SERVICE, UNIT' DEPTH FEET DEPT 'FT CDL1 COMPUTED DPHI CND01 CDL?CN$ ~ DOL NPHI FDCCHL PU GR1 DIL?BCS GAPI GR DILBCS GAPI ~CAL1 CDL?CNS IN CALI FDCCNL IN YCAL1 CDL?CNS IN CAL2 FDCCNL IN CNSS1 CDL/CNS Z SAND NPHI FDCCNL PU NCNS! CDL/CNS CPS NCNL FDCCNL CPS FCDL1 CDL/CNS CPS FFDL FDCCNL CPS NCDL1 CDL/CN$ CPS NFDC FDCCNL CPS RHOB1 CDL?CNS G?C~ RHOB FDCCNL G?C3 DEN01 CDL/CNS G?C3 DRHO FDCCNL G?C3 CNSl CDL?CNS Z LIME NPHI FDCCHL PU FCNS1 CDL?CNS CPS FCNL FDCCNL CPS DATA FORMAT SPEC I F I CATIONS *** ENTRY BLOCKS ENTRY TYPE DESCRIPTION 0 Terminator ( no:more entries )' TYPE SIZE CODE 0 1 66 13 DATA FORMAT SPEC i F I CAT'I ONS *** DATUH SPECIFICATION BLOCKS ************************************* SERVICE SERVICE APl AP1 APl APl FILE MNEM ID ORDER # UNIT LOG TYPE CLASS MOD # DEPT 123183 DPHI HPHI FDCCNL 123183 GR DILBC$'12318~ CAL2 FDCCNL 123183 NPHI FDCCNL 123193 NCNL FDCCNL 123183 FFDL FDCCNL J23183 NFDC FDCCNL 123183 RHOB FDCCNL 123183 DRHO FDC~NL 123183 NPHI ~DCCNL 123183 F~NL FDCCNL 123183 0 0 PU 4~ GAPI 0 iN 42 IN 42 PU 42 CPS 42 CPS 42 CPS 4~ G/C3 42 PU 42 CPS 42 0 0 0 0 0 0 0 1 68 I 0 31 0 0 28 0 0 1 0 0 0 1 68 3 0 1 0 0 0 1 0 0 0 0 0 0 1 35 1 0 1 39 0 0 1 $8 2 0 1 0 0 0 1 PRC # SIZE. LYL SHPL RC 4 0 1 68 4 0 1 68 4 0 1 68 4 0 1 ~8 4 0 1 68 4 0 1 68 4 0 1 68 4 0 1 68 4 0 I 68 4 0 I 68 4 0 1 68 4 0 1 68 4 0 1 68 PROCESS:INDICATORS 000000 000000 000000 000000 O000,OO 000000 000000 000000 000000 000000 000000 0000'00 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page 14 DATA Page DEPT DP.HI NPHI GR CALI CAL2 NPHI NCHL 'FFDL NFDC RHOB DRHO NPHI FCNL gS?O,O00 160,G06 -1,663 0,000 0,000 0,000 4,000 0,000 0.000 0,000 0,000 0,000 0,000 0,000 94;'0,000 lg, 758 16.600 29.400 8;750 8,930 23. 600 356.300 404.600 644. JO0 2.324 , 016 19,600 358. 000 '9370. 000 20. t21 I ?.330 25.200 8.'730 9.130 24,330 369.400 404,800 633.400 2,318 , 016 20.330 367,800 9270,000 19,515 1:8.441 25. 000 8; 7::30 9,120 25,440 348. 000 403. 200 627.800 2,328 . 011 21 ,440 340. 100 9170.000 26.545 15.t22 25.000 8,700 9.110 22.120 383.700 492,200 667.900 2.212 .013 18.120 407.200 '9070. 000 1 ?,.333 15.481 55.400 8,91 0 9.3'70 22.480 356.cj00 390. 500 637. 400 2.364 ,030 18,480 376. 500 FILE TRAILER .~.~,~**~~***~.~ name: &GSF01.002 Maximum length: !024. Seevice",name: TRAILER RE'CORDS File type: LO Yersion'#: N,e×t ¢ile: Page 16 *'" EOF *** *"EOF