HomeMy WebLinkAbout183-163MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, July 30, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Bob Noble
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
14-36
PRUDHOE BAY UNIT 14-36
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/30/2025
14-36
50-029-21039-00-00
183-163-0
W
SPT
8439
1831630 2110
1640 1654 1661 1661
0 7 6 6
4YRTST P
Bob Noble
5/17/2025
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT 14-36
Inspection Date:
Tubing
OA
Packer Depth
30 2494 2460 2453IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitRCN250518165543
MITOP000011024
BBL Pumped:4.8 BBL Returned:4.6
Wednesday, July 30, 2025 Page 1 of 1
MEMORANDUM
TO: JimRegg� l SIZI'Zr21
P.I. Supervisor [ 2
FROM: Adam Earl
Petroleum Inspector
Well Name PRUDHOE BAY UNIT 14-36
Insp Num: mitAGE210518193350
12e1 Insp Num:
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, May 19, 2021
SUBJECT: Mechanical Integrity Tests
Hilcorp North Slope, LLC
14-36
PRUDHOE BAY UNIT 14-36
Sre: Inspector
Reviewed By:
P.I. Supry .J-PR—
Comm
API Well Number 50-029-21039-00-00 Inspector Name: Adam Earl
Permit Number: 183-163-0 Inspection Date: 5/14/2021
Packer Depth
Well 11-36 - Type lnj W TVD 8430 Tubing
PTD Type Test s"I Test psis 2110 IA
BBL Pumped: 4 2 BBL Returned: 4' OA
Interval naTsr P/F 1' ✓
Notes: MIT IA '
Pretest Initial 15 Min 30 Min 45 Min 60 Min
1642 - 1638 -1 1639 - 1637 '
133 2397 - I 2359- 2348 "
s 21 21 - 20 -
Wednesday, May 19, 2021 Page 1 of 1
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Thursday,May 25,2017
TO: Jim Regg ,—I
P.I.Supervisor 1� `�,�l Z-t c `i SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC.
14-36
FROM: Brian Bixby PRUDHOE BAY UNIT 14-36
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry \I-P---
NON-CONFIDENTIAL
--
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT 14-36 API Well Number 50-029-21039-00-00 Inspector Name: Brian Bixby
Permit Number: 183-163-0 Inspection Date: 5/25/2017
Insp Num: mitBDB170525144407
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well ! 14-36 ' Type Inj [w -TVD 8439 ' Tubing 1324 1326 " 1326 ' 1331
PTD 1831630 - Type Test SPT Test psi 2110 IA 35 2497 " I 2480 " 2476
BBL Pumped: 5.4 ' ;BBL Returned: 4.5 OA 20 20 22 23 '
J
Interval 4YRTST P/F P V/
i_
Notes:
SCANNED j U L 1 1201 t?.
Thursday,May 25,2017 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
/ DATE: Friday,May 31,2013
TO: Jim Regg Ti1c f l 3
P.T.Supervisor ( � SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC
14-36
FROM: Lou Grimaldi PRUDHOE BAY UNIT 14-36
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry L11�1�-
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT 14-36 API Well Number 50-029-21039-00-00 Inspector Name: Lou Grimaldi
Permit Number: 183-163-0 Inspection Date: 5/29/2013
Insp Num: mitLG130529160522
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 14-36 'Type Inj W TVD 8439 , IA 670 2503 . 2478 . 2450 - 2456 - 2458
PTD 1831630 Type Test SPT Test psi 2109 OA 347 478 444 -j 446 456 467 _
Interval 4YRTST 'P/F P ✓ Tubing 991 - 990 H 988 900 973 . 995
3.2 bbl's MeoH pumped,3.5 returned.During test waterflood went down for 10/15 minutes then u ra
Notes: p P g came back up.'Tubing pressure/temperature
fell off influencing IA pressure.Held for additional 30 minutes for stabilization.
SCANNED FEB 2 6 2014
Friday,May 31,2013 Page 1 of 1
C~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator,. PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
Dec 07, 2009
i~,J~~'l,i'
•
by
~, -
~'-`e
LEC ~ _ ~0~9
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB DS 14
Dear Mr. Maunder,
rv S ..~ ~ _ ~. ~_. ~ ~/gyp: .u~~l~4t
r_:..
I g~-- ~
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
14 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
•
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
DS-14
Date: 12/05/09
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
14-otA 1931850 500292031701 Sealed Conductor NA NA
14-02C 2071150 500292031803 Sealed Conductor NA NA
14-03A 1961290 500292031901 Sealed Conductor NA NA
14-04A 1961640 500292032001 Sealed Conductor NA NA
14-05A 1920010 500292032701 Sealed Conductor NA NA
14-06A 2040360 500292032801 Sealed Conductor NA NA
14-07 1780660 500292032900 Sealed Conductor NA NA
14-08A 2022100 500292033001 Sealed Conductor NA NA
14-09B 1820340 500292053402 Sealed Conductor NA NA
14-10 1801300 500292052800 Sealed Conductor NA NA
14-11A 2051260 500292052901 Sealed Conductor NA NA
14-12 1811090 500292063100 Sealed Conductor NA NA
14-13 1811010 500292062400 Sealed Conductor NA NA
14-14 1811020 500292062500 Sealed Conductor NA NA
14-15 1810840 500292061100 Sealed Conductor NA NA
14-16A 1971670 500292060801 Sealed Conductor NA NA
14-17A 2030010 500292056201 Sealed Conductor NA NA
14-18B 2071290 500292055102 Sealed Conductor NA NA
1a-19 1810450 500292057800 Sealed Conductor NA NA
14-20 1810700 500292059800 Sealed Conductor NA NA
14-21A 2051070 500292075601 Sealed Conductor NA NA
14-22A 1921230 500292074701 Sealed Conductor NA NA
14-23A 2090200 500292075701 NA 4 NA 25.50 10/20/2009
14-24 1830910 500292097000 NA 0.6 NA 3.40 10/20!2009
14-25 1831020 500292098100 NA 2.1 NA 15.30 11/16/2009
14-26 1811100 500292063200 Sealed Conductor NA NA
14-27 1831700 500292104600 NA 3 NA 17.00 10/25/2009
is-28 1820120 500292070800 Sealed Conductor NA NA
14-29 1811680 500292068000 Sealed Conductor NA NA
14-30 2050940 500292067901 Sealed Conductor NA NA
14-31 1831110 500292098900 Sealed Conductor NA NA
14-32 1831220 500292099900 NA 0.6 NA 3.40 10/19/2009
14-33 1831250 500292100200 Sealed Conductor NA NA
14-34 1831330 500292101000 NA 7.3 NA 47.60 10/20/2009
14-35 1831420 500292101800 Sealed Conductor NA NA
14-36 1831630 500292103900 NA 0.7 NA 3.40 10/20/2009
14-37 1880490 500292181000 NA 1.3 NA 5.10 10/20/2009
14-38 1881030 500292186200 NA 0.8 NA 3.40 10/24/2009
14-40A 2011350 500292187501 Sealed Conductor NA NA
14-41 1920960 500292229000 NA 0.8 NA 6.80 10/18/2009
14-43 1921080 500292229600 NA 1.4 NA 10.20 10/23/2009
14-44A 2021930 500292257301 NA 10 NA 88.40 11/24/2009
STATE OF ALASKA
ALAS~L AND GAS CONSERVATION COMMIS
REPORT OF SUNDRY WELL OPERATIONS
~' o~~D9
1. Operations Abandon ~ Repair Well ~ Plug Perfora6ons ~ Stimulate~ Other Q BRIGHT WATER
Pertormed: Alter Casing ~ Pull Tubing~ Pertorate New Pool ~ Waiver~ Time Extension~ TREATMENT
Change Approved Program ~ Operat. Shutdown ~ PerForate ~ Re-enter Suspended Well ~ Polvmer/Surfactant
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development ~ Exploratory ~ 183-1630 ~
3. Address: P.O. Box 196612 Stratigraphic^ Service Q 6. API Number:
Anchorage,AK 99519-6612 50-029-21039-00-00
8. Property DesignaGon (Lease Number) : 9. Well Name and Number.
ADLO-028312 ~ PBU 14-36 -
10. Field/Pool(s):
.
Prudhoe Bay FIELD / Prudhoe Bay oil POOL
11. Present Well Condition Summary:
Total Depth measured 9565 - feet Plugs (measured) Fill (u~ 9470' 12/92 feet
true vertical 9251.01 - feet Junk (measured) None feet
Effective Depth measured 9470 feet Packer (measured) 8694'
true vertical 9163 feet (true vertical) 8439'
Casing Length Size MD ND Burst Collapse
Structural
Conductor 80 20" Surtace - 80 Surface - 80
Surface 2605 13-3/8" 72# L-80 Surface - 2678 Surface - 2678 4930 2670
Intermediate
Production 8993 9-5/8" 47# L-80 Surface - 9065' Surface - 8788 6870 4760
Liner 809 7" 29# L-80 8721 - 9560 8465 - 9246 8160 7020
Liner
Perforation depth: Measured depth: see attached - _ _ _ _
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# L-80 Surface - 8713' Surtace - 8457'
4-1/2" 12.6# L-80 8721' - 8787' 8457' - 8527'
Packers and SSSV (type, measured and true vertical depth) 9-5/8"X5-1/2" BKR FB-1 PKR 8694' 8439'
~
~4.T7'~ `a~e
12. Stimulation or cement squeeze summary: ~q:1 ~ ~, , r~_ ~~
~+~~~~~wd ,~ ,< ;; ~ ~~~
t
I
l
d
~
nterva
s trea
e
(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: 15974 1303
Subsequent to operation: 11838 1127
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory^ Development ^ Service ^~ -
Daily Report of Well Operations X 16. Weii Status after work: Oil Gas WDSPL
GSTOR ^ WAG ^~ ~ GINJ ^ WINJ ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone 564-4944 Date 9/21/2009
,..
Form 10-404 R sed 7/2009 ~~ ~"' `~' ~ Submit Original Only
~~ '~-S"e
14-36
183-163
PERF ~4TTACHMENT
n
U
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
14-36 8/26/84 PER 9,161. 9,191. 8,876.01 8,903.86
14-36 8/26/84 PER 9,210. 9,240. 8,921.51 8,949.38
14-36 8/26/84 PER 9,250. 9,270. 8,958.67 8,977.24
14-36 8/26/84 PER 9,280. 9,308. 8,986.52 9,012.5
14-36 12/20/89 APF 9,056. 9,080. 8,778.73 8,800.98
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
.
~ ~
14-36
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
9/17/2009;T/I/0=1050/480/20. Temp=lnj. Brightwater project. Pumped Brightwater
[treatment per procedure.
iPumped 586 gallons EC9360Afrom TIFU124520A
~ Pumped 1334 gallons EC9378A from AWXU630133A
~Pumped 1605 gallons EC 9378Afrom EXFU051951A
( Pumped 781 gallons of EC9360A & 2939 gallons of EC9378A for the day.
~Continued WSR to 9-18-09
9/18/2009`T/I/0=1100/480/20. Temp=lnj. Brightwater Project. Pumped Bright Treatment
j per procedure.
j Pumped 3573 gallons polymer from EXFU051951
? Pumped 2575 gallons polymer from AWXU630133 transfered from
~CLGU240010
~ Pumped 1263 gallons surfactant from TFU124520
;Continued WSR to 9-19-09
9/19/2009ET/I/0=1100/480/20. Temp=lnj. Brightwater Project. Continue from 9-18-09
~ pumping Brightwater Water treatment per procedure.
~ Pumped 4008 gallons of polymer from tank EXFU051951 _ transfered from
!TIFU324149
j Pumped 2546 gallons of polymer from AWXU630133 _ transfered from
' CLGU240010
; Pumped 1484 gallons of surfactant from TFU124520
~Transferred EC9378A from TIFU348365 to AWXU630133 (XXX gallons) did
~ not pump today.
; Pumped a total of 6554 gals of Polymer, pumped a total of 1484 gals of
( Surfactant.
9/20/2009~T/I/0=1100/480/20.~ ~Temp=lnj.~ BrightwaterProject continued from 9-19-09.~
~ Finished pumping Brightwater chemicals @ 1900 hrs.
iSurfactant TIFU124520 pumped 3832 gallons
~ Surfactant AWXU630144 pumped 903 gallons. Has 4154 gallons left in tank
moved to X-28.
Polymer AWXU630133 pumped 1360 gallons
~ Polymer EXFU051951 pumped 5200 gallons
~Polymer CLGU240010 pumped 5200 gallons (off loaded into AWXU630133)
~ Polymer TIFU324149 pumped 4923 gallons (off loaded into EXFU051951)
; Polymer TIFU348365 pumped 3519 gallons (off loaded to AWXU630133) HAS
;31" - 1704 GALLONS IN TANK moved to X-28.
~TOTAL VOLUMES: Pumped 20202 gals of EC9378A Polymer. Pumped 4735
gals of EC9360A Surfactant.
~Water injection rate started @ 10,000 BPWD and was between 9,800 to 10,200
BWPD. Total pump time was 78 hrs. Final WHPs=1120/480/20.
`SC=Closed. WV, SSV, MV=Oqen. IA, OA=OTG. NOVP.
~
MEMORANDUM
To: Jim Regg ~
P.L Supervisor '`~~~ 7('ZZ-(0 ~
FROM: Chuck Scheve
Petroleum Inspector
•
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, June 1Q 2009
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
14-36
PRUDHOE BAY UNIT 14-36
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.L Suprv .~ ~-'
Comm
Well Name: PRUDHOE BAY UNIT 14-36
Insp Num: mitCS090606074622
Rel Insp Num: API Well Number: 50-029-21039-00-00
Permit Number: 183-163-0 ~ Inspector Name: Chuck Scheve
Inspection Date: 6/5/2009
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
We~l 14-36 Type Inj W 1'~ 8439 ~ jA 125 2500 2450 2450
P.T.D 1831630 TypeTest SPT Test psi
Interval antTST p~F P f 2109.75 j QA
Tubing 15
tzso 30
izso 30
i2ao _ 30
izso
NOtes• Pretest pressures observed and found stable .
,rt,;-
~~,~, , ~ ~ ~ ,,%~~1;;
k:"~..~..w. . _ ~_ _
Wednesday, June 10, 2009 Page 1 of 1
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
- MPI-09
MPI-09 J-.()Q - (\"..):) ___
., ~:I-~"-'~01=L1
[ NK-08A G
NK-08A
18-34 iG\Ç'" it,lf'
04-05A í r¡ 3 .. I 'j l~
18-05Al (, ). - :2. . G
07 -36 i q '7 - { t 'I
14-36 18 J.. j (3
C-13A I q 7 - ; '1 J
U-12 18S--/~Á.
R-21 ¡ ð3 '. 11.tJ
R-12 í93-· 0))'"
E-16 /Sc - t;' :3
J-23 I 8 7.. C J t
F-31 I 3 ~ - 1)-7
H-35 G 'i .... J L.f q
Job#
10563225
10980572
10772241
10560316
10703956
10564525
10703939
10563112
10866557
10564527
11075900
10674388
10687647
10564529
10663003
10703943
10563217
10563216
Log Description
INJECTION PROFILE
INJECTION PROFILE
INJECTION PROFILE
PSP GLS
PPROF W/DEFT
PSP LDL
PRODUCTION PROFILE
LEAK DETECTION LOG
LEAK DETECTION LOG
INJECTION PROFILE
MEM PROD & INJECTION PROFILE
LDL
PRODUCTION PROFILE
PSP PPROF W/GHOST/DEFT
PRODUCTION PROFILE
SBHP SURVEY
SBHP SURVEY
PPROF W/GHOST
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
) (
;})'v (,0~ì
ì h, .-
r/.,-(,'-(' ) -
SCi~NNED
SE? ~
Date
10/05/03
06/09105
04/04/04
10/22/03
11/27/03
09/27/03
10/24/03
10/13/03
07/14/04
09/29/03
07/05/05
10/27/07
09/20/03
10/01/03
03/10/04
10/28/03
09/28/03
09/27/03
c 'ìíìOt::
FL.;' J
07/20/05
NO. 3438
,~7T lþ
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
CD
Color
-
~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth F1/' J "'k ,f }
! ! ('1 /! ,
Received by: ljr~\I''. '. L) vth..c·"
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COIVIIVlISSION
Mechanical Integrity Test
Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska) Inc.
Prudhoe Bay / PBU / OS 14
06/10/05
Donald Reeves
Packer Depth
Well 14-36 Type Inj. S TVD 8,439' Tubing
P.T.D. 1831630 Type test P Test psi 2,500 Casing
Notes: 4 year MIT-IA to 2500 psi. Chuck Scheve declined to witness
Well Type Inj. TVD Tubing
P.T.D. Type test Test psi Casing
Notes:
Well Type Inj. TVD Tubing
P.T.D. Type test Test psi Casing
Notes:
Well Type Inj. TVD Tubing
P.T.D. Type test Test psi Casing
Notes:
Well Type Inj. TVD Tubing
P.T.D. Type test Test psi Casing
Notes:
Test Details:
Pretest
1,300
120
Initial
1,300
2,500
15 Min. 30 Min.
1,300 1,300
2,480 2,470
SC.ANNED JUL 0 t¡ 2.005
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
Notes:
If the test was not AOGCC witnessed, leave the "AOGCC REP:" box blank.
MIT Report Form
Revised: 06/19/02
MIT PBU 14-36 06-1 O-OS.xls
!§d2- b\ \3\05
~ 1~3
\~
Interval
P/F
4
P
.¡,../'
Interval
P/F
Interval
P/F
Interval
P/F
Interval
P/F
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
o = Other (describe in notes)
ARCO ~ls_~k_~_; Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 3-22-93
REFERENCE: ARCO CASED HOLE FINALS
Prod Profile
]nj Profile
Prod Profile
z~J ~zome
~k Dete~t~To~e/?emp
Pzod Pzo~le
Pzod
Pump-Z~ ~owmete~
Please sign and return the attached colby
RECEIVED. BY_~~
Have A Nice Day!
Sonya Wallace
ATO-1529
as receipt of data.
AP PROVED__~,J~__
Trans# 93040
CKmco
Camco
Camco
Camco
Camco
Camco
C~__mCO
Camco
Camco
Camco
# CENTRAL FILES
# CHEVRON
D&M
# LUCILLE JOHNSTON
# EXXON
MARATHON
# MOBIL
# PHILUPS
PB WELL FILES
R&D
# BPX
# STATE OF ~KA
TEXACO
ARCO .A~ka, Inc.
P.O.Box 100360
Anchorage, Alaska 99510
DATE: 11-3-92
REFERENCE: ARCO CASED HOLE FINALS
10-3-92 Prod Profile Run 1, [~' Camco
9-28-92 Leak Detect (Flexstak) Run 1, [~' Camco
9-14-92 InJ Profile Run 1, [~' Camco
9-29-92 InJ Profile Run 1, [~' Camco
10-2-92 Prod-InJ (Flexstak) Run 1, [~' Camco
9-19-92 Leak Detect Run 1, ~' Camco
9-26-92 GR/Collar Run 1, ~' Camco
9-27-92 GR/Collar Run 1, ~' Camco
9-25-92 Prod Profile Run 1, ~' Camco
9-14-92 Prod Profile Run 1, ~' Camco
10-2-92 lnJ Profile Run 1, ~' Camco
9-4-92 Prod Profile Run 1, ~' Camco
10-4-92 lnJ Profile Run 1, ~' Camco
9-26-92 Prod Profile Run 1, ~' Camco
9-26-92 GR/Collar Run 1, ~' Camco
10-5-92 InJ Profile/PITS Run 1, ~' Camco
9-27-92 InJ Profile Run 1, ~' Camco
9-19-92 Leak Detect Run 1, ~' Camco
9-27-92 Prod Profile Run 1, 5~' Camco
10-4-92 Inj/Shut-In Temp Run 1, 5" Camco
10-2-92 InJ Profile Run l, ~' Camco
10-2-92 InJ Profile (Flexstak) Run 1, [~' Camco
10-1-92 , InJ Profile Run 1, ~' Camco
9-15-92 InJ PrOfile Run 1, [~' Camco
9-17-92 Prod Profile (Flexstak) Run 1, [~' Camco
10-1-92 Prod Profile Run 1, ~' Camco
9-28-92 GR/Collar Run 1, ~' Camco
9-28-92 Prod Profile Run 1, [~' Camco
9-15-92 Prod Profile Run 1, [~' Camco
10-1-92 Prod Profile Run 1, [~' Camco
Ple.e sign and return ~le attac/I}e~d copy. receipt of ~C E [ V E D
RECEIVED
Have A Nice D~. //- v ~/aska 0il ~nac~0~;
~o_n~52W?ce ~s5~55~-~-
# CENTRAL FILES
# CHEVRON
# LUCILLE JOHNSTON
# EXXON
# MOBIL
# PHILI31'S
PB WELL FILES
# BPX
# STATE OF ~KA
STATE Of ALASKA
~-,.....,
~ -' ALASK/'~-"IL AND GAS CONSERVATION C( :MISSION
REPORT SUNDRY WELL OPERATIONS
1. Operations performed: Operatmnshutdown __ Stirnu,ate ~ P,uooing __ Perf°rate~ I G
Pull tubing Alter casing Repair well
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM
At top of productive interval
2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM
At effective depth
2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM
At total depth
2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM
5. Type of Well
Development
Exploratory
Strafigraphic
6. Datum of elevation(DF or KB)
73' RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
14-36i
9. Permit number/approval number
83-163
10. APl number
50 - 029-21039
11. Field/Pool
Prudhoe Bay Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
9565 feet
9251 feet
Plugs(measured) Fill @ 9470' MD (12/22/92)
Effective depth: measured 9470 feet
true vertical 9163 feet Junk(measured)
Casing Length Size Cemented Measured depth True vertical depth
Conductor 80' 20" 375 sx PFII 80' 80'
Surface 2605' 13-3/8" 2000 sx Fondu & 400 sx PFC 2678' 2678'
Production 8993' 9-5/8" 500 sx Class G & 300 sx CS I 9065' 8788'
Liner 809' 7" 300 sx Class G 9560' 9246'
Perforation depth: measured 9056-9080'; 9161-9191'; 9210-9240'; 9250-9270'; 9280-9308'
true vertical 8778-8801 '; 8876-8904'; 8921-8949'; 8958-8977'; 8986-9012'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713' MD; 4-1/2", 12.6#, L-BO, PC tubing w/tail
@ 8787' MD
Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230' MD; Baker packe~r~EB~. @ 8694' MD
13. Stimulation or cement squeeze summary '~% ~ _r
Intervals treated(measured) See attached. ~:~=
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or miection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation .... 16789 -- 1649
Subsequent to operation
19916 -- 998
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service Iniector
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Engineering Supervisor
:orm 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
14-36i
DESCRIPTION OF WORK COMPLETED
FILL CLEANOUT/AClD PERF WASH & STIMULATION TREATMENT
11/30/92:
RIH & tagged top of fill at 9283' MD.
12/5/92:
MIRU & PT equipment to 4300 psi. RIH w/CT & performed a fill cleanout down to 9496' MD,
then reciprocated an acid wash across the perforations at:
9056 - 9080' MD (Sag)
9161 - 9191' MD (Z4)
9210 - 9240' MD (Z4)
9250 - 9270' MD (Z4)
9280 - 9308' MD (Z4)
Ref. Log: BHCS
12/31/83.
Jetted 29 bbis 12% HCI w/10% Xylene @ 3 bpm, then surged well w/nitrogen. POOH w/CT.
Rigged down.
I 2/1 6/92:
Performed a fullbore Chem Frac Stimulation treating the perforations (listed above) as follows:
MIRU & PT equipment to 5000 psi, then pumped:
a) 50 bbls 15% HCI w/10% Xylene @ 5 bpm, followed by
b) 50 bbls 7.5% HCl/Musol @ 10 bpm, followed by
c) 25 bbls 1% KCl Water Spacer @ 10 bpm, followed by
d) 200 bbls 2% Hydrogen Peroxide @ 10 bpm, followed by
e) 25 bbls 1% KCl Water Spacer @ 10 bpm, followed by
f) 100 bbls 7.5% HCl @ 10 bpm, followed by
g) 50 bbls 1% KCl/Foam Flush @ 10 bpm, followed by
r)
s)
t)
u)
v)
x)
Y)
z) 50 bbls Meth Water, followed by Shutdown.
h) 60 bbls 1% KCl/Nitrogen/Foam Diverter @ 2 bpm, followed by
i) 50 bbls 1% KCl/Foam Spacer @ 15 bpm, followed by
j) 50 bbls 7.5% HCI/Musol @ 15 bpm, followed by
k) 25 bbls 1% KCl Water Spacer @ 15 bpm, followed by
I) 200 bbls 2% Hydrogen Peroxide @ 15 bpm, followed by
m) 25 bbls 1% KCl Water Spacer @ 15 bpm, followed by
n) 100 bbls 7.5% HCl @ 15 bpm, followed by
o) 50 bbls 1% KCI/Foam Flush @ 15 bpm, followed by
p) 60 bbls 1% KCI/Nitrogen/Foam Diverter @ 2 bpm, followed by
q) 50 bbls 1% KCl/Foam Spacer @ 20 bpm, followed by 50 bbls 7.5% HCl/Musol @ 20 bpm, followed by
25 bbls 1% KCl Water Spacer @ 20 bpm, followed by
200 bbls 2% Hydrogen Peroxide @ 20 bpm, followed by
25 bbls 1% KCl Water Spacer @ 20 bpm, followed by
100 bbls 7.5% HCl @ 20 bpm, followed by
50 bbls 1% KCl/Foam Flush @ 20 bpm, followed by ~ r" ~,~
300 bbls 1% KCI Water DiSplacement @ 20 bpm, followed by~-~"~ ~ C~.~ 1¥ ~
12/22/92:
RIH & tagged top of fill at 9470' MD.
Returned well to produced water injection & obtained a valid injection rate.
ARCO/~lnsk~, Inc.
P.O.Box 100360
Anchorage, Alaska 995 10
DATE: 7-10-92
REFERENCE: ARCO CASED HOLE FINAL~
2-32 ?/-/// 6-21-92 Prod Profile Run 1, 5"
3-10 ??--~/ 6-20-92 Inj Profile Run 1, 5"
3-26~3-~_?s'l 6-28-92 Prod Profile Run 1, 5"
4-14 ?~' 3~ 6-28-92 Temperature Run 1, 5"
5-5 Y~" ~/? 6-22-92 Prod Profile Run 1, 5"
7-5 6-23-92 Prod Profile Run 1,
9-38 6-30-92 Inj Profile Run 1, 5"
9-39 6-30-92 Inj Profile Run 1, 5"
12-17 ~-~ 6-29-92 Leak Detect Run 1, 5'
13-15~.l-/~' 6-27-92 Inj Profile Run 1, 5"
13-298J-~/~ 6-19-92 Prod Profile Run 1, 5"
13-32~-~/:z~ 6-27-92 Inj Profile Run 1, 5"
14-14~/o/~ 6-26-92 Inj Profile Run 1, 5"
14-36~-/~$ 6-26-92 Inj Profile Run 1, 5"
16-7 ~5'-~/ 6-19-92 Prod Profile Run 1, 5"
CanlCO
Camco
Camco
C~mco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Camco
Please sign and return the attached copy as receipt of data.
RECEIVED BY
Have A Nice Day!
Sonya Wallace
ATO-1529
APPROVED_ __
Trans# 92150
# CENTRAL FILES
# CHEVRON
D&M
# EXTENSION EXPLORATION
# EXXON
MARATHON
# MOBIL
# PHILLIPS
PB WELL FILES
R&D
# BPX
# STATE OF ALASKA
TEXACO
P,O,' BOX. tO036e .......... ".i ..... :. . --::.::_:_i :-_ ........... ~;~ ...........
..... E.C.E_IV_ED_:.
· ... ............................. :L~;~:..., .......... ' JUN. 1- 1 1~91
DATE: . ' 6 t3-9t ~-~"
~ . - f~-. .-
REFERENCE'. ARCO CASED HOLE FINAL~~ ~cho~ge
~i~fZ?' ' .... - t COLLAR-PERF · RUN
..... = t 3~2~ ...... 6-2-9t COLL~R-PERF~:;.LL.~ ..... ~ ............... '~.L ........ RUN-.t .--5"
.,.-... . ~.. '~ ......
' t ~f?--' 5-f 6-9t -:'~'L~:-"-' ]NJ PROF.-~ '~-.~':' ' ".'~;~--- '- RUN
--t 4-2~L,-: .... 5-~ 6,9t ,-~.<=~,L-[NJ F'ROF~ ....... ~=.-. - - ': ? - ' ,-
. . . .............. T~=, ........ =--. R U N -'-t
.... t ~-25 5-t 6,9t :_.=.'~INJ PROF.~GR-..~ :. ;.': ' .~,~=~?- . . RUN t, 5
._ .
........ :.s'.t ~-36 '=--~-5-t 6-9t--.~S.-tNJ PROF ~ ..... - .... . , ? . RUN---t
' ~:t5-f5' 5-t7-9t-_':~:~:~PR06 :~ROF'-.:,:~:~-:~-' ' : -~.;'-".:'"~['.::?::' . RUN .t-~
--~-t.6-~i-i-:---:---5-23-9 t-.-;-'-.~ ~[NJ--PRO~ ,~.~.;~;~:~:; ............. :. -.:-:S---: ............ RUN ~ ,---5
· .
ATLAS
A~LA$-
CAMCO
' .CAMCO
· CAMCO
" ........... ~AMCO-
· 'CAMCO
· CAMCO
" CAMCO
.-/t ~~._...l_~.i 6-$~-.---.:. 5-2S-9t ;" F'ROD PROF '~.;:'"_'...'. . - ':'. ~ RUN ~ . 5
.... ::--.t 6---24 ...... 5-1 9-9t~ .... _-~.PROD ..PRO~- ,':'--:~'~ ..... i~: .... ' -' " "' ' N '.-. .-.: . .
......... -_ .--~..---.'-~:.-.-,~: .... RU .-i-, :---5 -_.-..CAMCO --.
- _ .'. - -- - · ~ -_'.- _~.; ' ;;.~' _.>.~-",~,;- " . ~., , ._ ._- - . .. -' -...-.'::;~ .x. ~ - ,.. .' , . - ...-~:.:'~,~ · ' :~ ' .;- ., .
.-:. :.'>;~_i 7,..~. ':-:.:--' '5-B-9t -'?:':_;"-;~,-s-:LEAK..DETE~[.~!?.-:.::~ ..--'.-_ .... . ' -. ,'::-::-':~e~.;'_'...~-;-.;..:.~RUN ..t ., :.:~ ~. ..- ..-- !: : :- ' ..-CAMCO
- : '~ ~ .': - - --;:"~'---~'-'-...-' ' ':-L'~'>;?--- ..... -~,,~:~_'-:-'~-:'- 7 ': : · ' .' .... :::~;~.'.~.d~:.'~-~.: .:::.:. .- :, 's'= .'-;-'~: i'::'~'.:~'-".:'..i ': :"-,"
- ' . : -- - ~ ,-~ --' -' .L:~-' -' - ---:..:_' --.-¥-_.. ' - ~ ~ ':.--..?,L': ~.. ... .. -.~ ? .,)-.. · ,-:j,.~ .... ..- ·: .
-- --. -- t 7---t t - 5-.-, -9t -.--.-: '. LEAK DETECt__ --.-- . ...... ~.~':~,.'- . .. RUN .~ , ,..5 .-:... ...... .-::'-,-, CAMCO
.... L=..:~. ~:?.'---..t_4~-_L~5-.--I t.-~._t--~.:~-.!~PROD-. PROF.,..~-;~-'~_~_ ' L __:.-'-_!:'~:~:- ;: .... ;.' :i'i!:.'.RUN'~' ;-'= 5 "--"~'~-:'"" :"":"'-"::~CAMCO ·
- _~'-"-'i~:':-:----:N~I ~':7 :,,'-~"-'-:.5-t'2-9i-'--->~:i~i'"~I NJ - --"~'~-' :-' ...... ' ...... '~:~' '
PROF-~-: ?~:'~?~---';~.;'-. -'--....-." :. :' "-:,':S:~>".:?' '" ::~"RUN ~'~ :'::?, 5 · '..:~s?" :-'"'-.'~.,:JCAMCO .
~._-'W~I,5'-;.-.:.'SSt2"gt_".-'~"~.--'iNJ pF.'OF""!'!"'~'~':":__'-.;i'"'.'_.'_ i'~':.i~.'-i'~:~'-'i.." -RUN"i',;"5" >~:::i_':~':.-'i.~'!./CAbtCO''
_
.... · ' . 'i- '~
~ . .:'.---... '. :':_~- .:.~-'
F'LF_~zsE ST_GN AND RETURN THE ATTACHED COF'Y A~-: RECE~F'T OK DfiTA, . ...... . .........
· ..
~ -_ . - ' - .. . · ' ~
5 ' . . ; : . .-.-.
.
RECEIVED B
.'J.'H'AVE'.i~-N~ce' DAY.,._.._-~-:-i--.'.-. ;.-_~:::i_..::--_,_.-'~.-.~----:~ii~i.----.,.:---..-i"..;..' . -..:~,~-:Y. ;..' .... / '-' ..: " -
----~'.~..~---,._-:~- ..... ~'-~-__.-.:__._ '~-~;~~--;"-: '~:~' "-'~ ~-'-';-~?' .... '-' ' ' ....... _ i..i_! ....... . . .... -- -~,-..-~:.._-_ ..... . ~-_-. ---~-. -~- ..... ~----
~?-.-i~:<.-_?_,:._-'._~:.!~r~.~,.~.,._-..._.~... :.':.-, '.,:.'i~?.~':---. '--,-'-" ' ~ ' :'.-'- ' - '
-';~.-"_'$ONYA ..-WALLACE' --: ::-"V~"::~'.-?;----:.-::'?~:.'-:::-~!~-~i~--~~!~i~/";-':;:~-i-~._ 'A~ }?.'?~!~ii~:~;'-':'?}'~i' .":::---'.-..'-i-:;.~"~-" -:" ': '.
-. ~;:,-., . -~ - . ~ .,~: ...._ .. :- - .; ?:,~:::_:::::~-:~;_-.:-. ::.__.-.;-_.-~:.:-.~-?.-.-~~W~;!?;~¥.:. --,-_, :.~..- , ~.'~ .-- . ,.. ?:-~ .. .. ..,:..'..iL- ~;;.-'.:~_ ...-- .: :.. ~- .- : /, ...- . .....,;-:...,, ..
..... .-..~a t_o---~.,m-,:~ :.:-.-:: .... ,.?.~,..-..___.,>,~?~.._-.:~_:~_:.~.~:_.._?,_. _......T. rAN~~~i;i_~...,...~......,: .... , ..... ._.~....: ..... ....~ .......
--'--Y'-':':'-: -' -' ' .. i'i./' 57-'': '-ii_:i:..-::_'.' ii_ .....
- -'.'?-%~-.~-~- .'-~- ;"'-'--"'~'.. _. ........... . ....... -~}~ ..:'. .~ _ ~. ;.' .... ?._.: . ..-.-_..
· . -..
........
.- D'I.$T-RIBUT. ION .......... ',~---.--' - .......
. _ _ - . . .
~ .. - ~. ~_.. - .-- .. -. '._ :.-.
.._.~__~L___: ....... ·-. CENTRAL-F--~LE£ ...._,:~;.L.L ..... _-~. _--~. ...... . -~ ..... F.'HTLL]P$ ' -'' ' ' '
-' . --.- ...:
' .--~ CHEVRON '- -' ...... '""-':::::~' '"- P~ WELL'F~LE$ '
--
................. ~ D & M. ' ....... R.&.D
~- EXTENSTON EXPlORaTiON ' ~ BF'X
...................... ~". ~ .EXXON ...... ' ~;-%-5---.-~- .... STATE.-OF-.~L~$KA .........................................
.. ~
MARATHON . TEXACO ' ' ....
' MOBil -
ARCO ALASKA, INC~
F'.O, BOX iOOJ&f~
ANCHORAGE, ALASKA 99510
DATE' 4-27-90
REFERENCE' ARCO CASED HOLE FINALS
2-4 i0-t2-89 F'ERF RECORD RUN ~, 5'
4-4 4-J-9() PRODUCTION F'ROFILE/F'ITS RUN i, 5'
4-5 4-5-9~ PRODUCTION PROFILE/PITS RUN i, 5'
4-'~7 i2-9-89 F'ERF RECORD RUN t S'
5-i 0 i t~-i2-89 F'ERF RECORD RUN i , 5'
6-i i~-29-89 TEMF' RUN i, 5'
?-i i2-24-89 F'ERF' RECORD RUN i, 5'
?-i 4-7-9~ PRODUCTION PROFILE RUN i, 5'
7-2 4-7-90 PRODUCTION PROFILE RUN i, 5'
7-20 4-6-9r~ PRODUCTION PROFILE RUN t, 5'
?-23- i2-24-87 F'ERF RECORD RUN i, 5'
9-9 4-8-90 F'RODUCTION PROFILE RUN i, 5'
t3-4 it-25-89 F'ERF RECORD RUN i, '5'
t4-~56 i2-20-89 PERF RECORD RUN t, 5'
i?-3 i2-8-89 COLLAR RUN i, 5'
PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIP'F OF DATA.
FILS
CAMCO
CAMCO
HLS
HLS
HLS
HLS
CAMCO
CAMCO
CA~CO
HLS
CAMCO
HL.S
HL~
HLS
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
'AT0-i529
t A¥ - ? 990 - ,/
Commission A F' F'R 0 V E D~
&
Cons.
TRANS'~ 90q 75
~cho~e
DISTRIBUTION
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORATION
EXXON'
MARATHON
MOBIL
PHILLIPS
PB WELL FILES
R & D
BF'X
$1'ATE OF ALASKA
TEXACO
* THE CORRECTED API~ FOR 4-27 IS 50-~29-2i505.
ARCO AL.A.?KA, INC.
P.O. BOX ~0036(}
ANCHORAGE, ALASKA
9954
DATE' 3-9-90
REFERENCE' ARCO PRESSURE DATA
3-4 I -6-90 BHP--STATIC GRADIENT CAMCO
S-~8 t-6-90 BHP--~TATIC GRADIENT CAMCO
9-J5 4-~5-90 BHP--STATIC GRADIENT CAMCO
9-49 4-45-90 BHP--$TATIC GRADIENT CAMCO
t t-4 4-5-90 BHF'--$TATIC HRS
t t .-t 6 4 -5-90 BHP--$TATIC HR3'
t 2-23 ~ -7-90 BHP--$TATIC HRS
42-29 4-~3-90 BHP--STATIC GRADIENT CAMCO
~ 3-32 t -7-9~ BHF'--STAT IC HR$
44-2~ ~-3-9~ BHP--FLOWING GRADIENT CAMCO
~4-36 ~-S-90 BHP--FLOWING GRADIENT CAMCO
~6-~t ~-43-9~ BHP--STATIC GRADIENT CAMCO
~8-S ~-29-89 BHP--STATIC GRADIENT CAMCO
~8-9 ~4-:29-89 BHP--£TATIC GRADIENT CAMCO
~8-~6 ~-29-89 BHP--£TATIC GRADIENT CAMCO
~8-20 4~-29-89 BHP--STATIC GRADIENT CAMCO
PLEASE SIGN
RECEIVED BY
HAVE A NICE DAY!
SALLY HOFFECKER
ATO-~ 529
AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA.
RE-C- 't-¥E D
MAR ! 4 !990
Oil & GB.S COilS. Cottllll[~,S'tOJ~ APPROVED~___
DISTRIBUTION
CENTRAL FILES ~ ~ ~'HILLIF'$
CHEVRON PB WELL F'ILES
D & M ~ ~' R & D
EXTENSION EXF'LORATION ~ BPX
EXXON -,.~'STATE OF' ALASKA
MARATHON ~ TEXACO
MOBIL
ARF'.'f] Ai_A,ffK A., ][ N"'"
F'.. FO ~ BOX i "L':'(i:,$6,3
:'-": i'~ r' H F~ R A G E ALA~,'K A
DATE:' 2-i 4-90
REFERENCE' ARCO PRESSURE DATA
-i A i i -".23-89 BHF'--STATiC: ',]-i~:.ADiEN"I'
:.-'--~_ i i--~E:,-89 BHF ...... ~?TA'TIC GRADZENT
3-7 i 2-4-89 BHF'--[.,'TAT]:C [;-RAD]:ENT
S--f"5 i i-22;--89 BHF'--ZTATIC GR.,':~Dii'ZNT
4-2i ii-24-89 BHF ...... .ffTATIC GRADIENT
,'-_.-. ~-~--27--:.gv BH.:'F .... .'-'.-:TA'F:[C Gi~.-'.ADtENT
5-5' ~, .i, - 24- 8'.-F." _'F,' N F.. ..... $ T A T T '-'~. ,_, GRAD ]: EN T
Z,-'Y 'i 2--i 6'-89 BHP--$TATiC: :SF-.'.AD:[ENi'
5-22 t2-i6-89 BHF'--Zi"ATtC GRADT_ENT
4-i S i '.2-6--89 BI4. F'--ZTATiC C-RADIENT
4-27 i2-i7-89 BHF'--$TAT!C GRADTENT
4-.3i i :'--'- ~- 8o, , BHP--$'TAT .[ F:_ -GRADIENT.:,
4-.'56 i 2"-i 6-89 BHP--,~;TATIC GI~..'Ar~IENT
CAHCO
CAMCO
C A H C 0
CAMCO
C A H C 0
C A M C 0
C A i',i C 0
C A M C
Cg, MCO
CAMCO
CA~4CO
CAMCO
C A M C il)
PLEASE SIGN AND RETURN THE ATTACHED
REnEIVED~. BY
::.'-_.'ALLY HOFFECK ER
ATO-t Z29 FEg 15 !990
Anchomg~
DISTRIBUT]:ON
COF'Y AS F.'.ECEiF'T OF DATA
AF'F'ROVEi) .~. ....
]'RA NS'-'~ 9 ":J":~' 6 S
CENTRAL FILES
CHEVRON
D & M
EXTENSION EXPLORaTiON
EXXON
.
MARATHON' "
MOBIL
F'HILLIF'Z
F'B WELL F'ILE~
OF ALASKA
F,' & D
Bpv
.i ,,-%
$'FATE
T E X A C 0
ARCO A!_A£'KA... INC,.
P~O, BOX i,3;3,36¢,
ANCHORAGE, ALASKA 995i~-~
REFERENCE- ARCO CASED HOLE FINALZ
3-t6 i-7-9~ INJECTION PROFILE RUN
4-'~-.' f 2-28-89 INJECTION F'ROFI~ ~' ~'IIN
7-22 i-5-9~D PRODUCTION Pr.;.~OFILE RUN ~, 5.'
9-~ ~ -8-9~.D PRODUCTION PROFit_E RUN
~, .~-2~A i. - ~ i - ~,.'D,. I NJECTI,.,,~-! PROFILE RUN
i 4-6 ~ -4-96, F-'TT~ Ptj~'J
~ ! .~ , ,. · . .. o~.,
,i ..a.--~ '
. . .~.~ i-3-?~.-) INJECTION F'RF~FILE._ RUN i, _,-
14-36 i-5.-9¢ INJEC-FiON PROFI!_E RUN
-- ~' F ,~'.uDUCT I .,.
i5 i i-i¢-9¢ 'P-- ON PROFILE RUN i, ~"
i8-24 !-i¢-96, PRODUCTION pROF:"rLE RUN
PLEA.'.'TE .~IGN AIND RETURN'~ ATTAC'Hr-..:.'D COF'Y~ A~.--: RECEIF'T OF DATA~
HAVE A NICE
SALLY HOFFE,-:KER ' B -- 9 !~s~O '..-
~TO- i
DZ3'TRIBUTION
APF'ROVED _~__
TRAN~ 9 ~-5 r-354
CENTRAL FILES
CHEVRON
D&M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
PHILLIF'~ '
11"
F'B WELL FILE~
R & D
~~ BF'X
"' *d'TATE OF ALASKA
· " TEXACO
THE CORRECTED WELL NUMBER IS t3-23A, NOT i3-25,
CAMCO
(]AMC(]
C A M C C)
C A M C 0
CAMCO
il'"-';. ;"' Im
CA~'ICO
CAMCO
CAMCO
UAMCt]
..--.~ STATE OF ALASKA ~--
ALASK )ILAND GAS CONSERVATION (,. '/IMISSION ~
REPORT OF SUNDRY WELL OPERATION, . i
1. Operations performed:
Operation shutdown Plugging Perforate X
Pull tubing ~ - Alter casing Repair well Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
2085' FNL, 1055' FEL Sec, 9, T10N, R14E, UM
At top of productive interval
2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM
At effective depth
2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM
At total depth
2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM
5. Type of Well
Development
Exploratory
Stratigraphic
Service
6. Datum of elevation(DF or KB)
73' RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
14-36
9. Permit number/approval number
83-163/9-1028
10. APl number
50 - 029-21039
11. Field/Pool
Prudhoe Bay Oil Pool
feet
True vertical depth
80'
2678'
8788'
9246'
Tubing Pressure
562
607
Injector .
Date
SUBMIT IN DUPLICATE
12. Present well condition summary
Total depth: measured
true vertical
9565 feet Plugs(measured)
9251 feet
Effective depth: measured 9516 feet
true vertical 9205 feet Junk(measured)
Casing Length Size Cemented Measured depth
Conductor 80' 20" 375 sx PFII 80'
Surface 2605' 13-3/8" 2000 sx Fondu & 400 sx PFC 2678'
Production' 8993' 9-5/8" 500 sx Class G & 300 sx CS I 9066'
Liner 809' 7" 300 sx Class G 9560'
Perforation depth: measured 9054-9078', 9161-9191', 9210-9240', 9250-9270', 9280-9308'
true vertical 8776-8799', 8876-8904', 8921-8949', 8958-8977', 8986-9012'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713'; 4-1/2", 12.6~, L-80, PC tubing w/tail @
8787'
Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230'; Baker packer FB-1 @ 8694'
13. Stimulation or cement squeeze summary
Intervals treated(measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Averaae Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
7261
8178
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed _.~. ~,/,,~_~__~]~ ~_,,~ ~4 ~ ~ Title Operations Engineering Manager
v
Form 10-404 Rev 06/15/88
DS 14-36
SAG RIVER ADD PERF PROCEDURE
REPORT OF WEll OPERATIONS
PROCEDURE:
WORK PERFORMED 12/20/89
1. RIG UP E/L AND TEST LUBRICATOR
2. RIH WITH PERFORATING GUNS AND TIE IN TO REFERENCE LOGS
3. PERFORATE SAG INTERVAL 9056'-9080' MD (BHCS 12/31/83)
TO ATTAIN 8 SPF WITH RUNS AS REQUIRED POOH.
4. RD AND RELEASE E/L.
5. RETURN WELL TO INJECTION STATUS
STATE OF ALASKA ~ ~- -,)
ALASK,~'"~'IL AND GAS CONSERVATION C,_ JMISSI(DN~ ~- ~
APPLIC ,'ION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon Suspend Operation shutdown Re-enter suspended well
Alter casing Repair well Plugging Time extension Stimulate
Change approv'~ program ~ull tubing Vadance Perforate ~ Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM
At top of productive interval
2647' FNL, 2600' FEL, Sec. 9, T10N, R14E, UM
At effective depth
2624' FNL, 2548' FWL, Sec. 9, T10N, R14E, UM
At total depth
2621' FNL, 2530' FWL, Sec. 9, T10N, R14E, UM
6. Datum of elevation(DF or KB)
RKB 73'
7. Unit or Property
Prudhoe Bay Unit
8. Well number
14-36
9. Permit number
83-163
10. APl number
50 - 029-21039
11. Field/Pool
Pru, dh9_e ,.B. ay..O!1 po_o!
~-:.
12. Present well condition summary ._~ ,, .... .
Total depth: measured 9565 feet Plugs(measured)
true vertical 9251 feet
Effective depth: measured 9516 feet
true vertical 9205 feet Junk(measured)
Casing Length Size Cemented Measured depth' True vertical depth
Conductor 80' 20" 375 Sx PFII 80' 80'
Su dace 2605' 13-3/8" 2000 Sx Fondu & 400 Sx PFC 2678' 2678'
Production 8993' 9-5/8" 500 Sx Class G & 300 Sx CS 1 9066' 8788'
Liner 809' 7" 300 Sx Class G 8751-9560' 8493-9246'
feet
Perforation depth: measured 9161-9161'; 9210-9240'; 9250-9270'; 9280-9308'
true vertical 8876-8904'; 8921-8949'; 8958-8977'; 8986-9012'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PC tubing @ 8713'; 4-1/2", 12.6#, L-80, PC tubing w/tail @ 8787'
Packers and SSSV (type and measured depth) 5-1/2" Camco BaI-O SSV @ 2230'; Baker Packer FB-1 @ 8694'
13. AttaChments
Description summary of proposal x Detailed operations program BOP sketch
14. Estimated date for commencing operation
December 1989
16. If proposal was verbally approved Oil x Gas
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
/
Signed ~~7~.~.~ ~ "~~¢,2' Title Operations Engineering Manager
FOR COMMIRRION H~E ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10- ~
Approved by order of the Commissioner
ORIGINAL SIGNED BY
LONNIE C. SMITH
15. Status of well classification as:
Suspended
Date 2,7~.~¢' ~'
I Approval No.F~
~kpproved CoPY
Returned
Commissioner Date //-~'~:~
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
PROPOSED PERFORATING
DS 14-36
ARCO Alaska proposes to add perforations in the DS 14-36 Injector
in the Sag River formation of the Prudhoe Bay Unit. All wire line
work will be done through 5000 PSI working pressure
BOP/Lubricator, tested to 1.2 times the maximum expected surface
pressure. The purpose of the proposed perforating will be to
provide effective drainage of the Sag River reserves.
Ref: BHCS 12/31/83
Proposed Perforation Interval'
9056-9080' MD
1. 5000 PSI 7" WELLHEAD CONNE:CTOR FLANGE
2. 5000 PSI WIRE:LINE RAMS (VARIABLE SIZE:)
3. 5000 PSI 4 1/6" LUBRICATOR
4. 5000 PSi 4 1/6" FLOW TUBE PACK-OFF
N I REL I NE BOP EGU,I pHENT
ARC(] ALASKA, INC.
F'.O, BOX 'i00360
ANCHORAGE, ALASKA
995J0
DATE' 8-29-89
REFERENCE' ARCO PRESSURE DATA
S-t 5 7-27-89 BHF'--5'TATIC GRADIENT CAMCO
3-33 7-t4-89 BHF'--£TATIC GRADIENT CAMCO
4-2 7-8-89 BHP--$TATIC GRADIENT (W/ATTACH.) CAMCO
7-5 7-~9-89 BHF'--£TATIC GRADIENT CAMCO
7-7A 7-S~ -89 BHF'--PBU HRS'
7-8 7-29-89 BHP--$TA'I'I C GRADIENT CAMCO
7-t ¢., 8-5-89 BHF'--S'TATIC GRADIENT CAMCO
7-~ 4 7-29-89 BHP--F'BU HR$
7-27 7-2~;-89 BHP--$TATIC GRADIENT CAMCO
7-33 7-23-89 BHP--£'I'AT I C GRADIENT CAMCO
9-24 7/t4-t5/89 BHF'--S'TATIC GRADIENT CAMCO
9-38 8-~2-89 BHF'--$TATIC GRADIENT CAMCO
~t-:2 7-7-89 BHP--$TATIC GRADIENT HRS'
t~-7 7-9-89 BHP--$TATIC GRADIENT HR$
~t-i6 7-~0-89 BHP--$TA'[IC GRADIENT HR~~
~-~7 8-~-89 BHP--FLOWING GRADIENT CAMCO
~ 2-30 7-:23-89 BHP--$TATIC GRADIENT CAMCO
~4"'t9 8-~0-89 BHP--$TATIC GRADIENT CAMCO
~4-22 8-t7-89 BHF'--$TATIC GRADIENT CAMCO
~ 4-36 7-29-89 BHF'--FLOWING GRADIENT CAMCO
~4-39 8-~S-89 BHP--S'TATIC GRADIENT CAMCO
~5-~ T-2~-89 BHF'--$TATIC GRADIENT CAMCO
~ 6'-i 2~ 7-26-89 BHF'--~'TATIC GRADIENT CAMCO
~ 6-2~) 7'-t S-89 BHP--£TATIC GRADIENT CAMCO
~8-25 7-~S-89 BHP--$TATIC GRADIENT CAMCO
PLEASE £IGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA.
DISTRIBUTION
AF.F. ROVED-~J-~
TRAN$:~ 89363
CENTRAL FILES
CHEVRON
"' D & M
EXTENSION EXPLORAI'ION
~ EXXON
HARATHON
/2.. - ~ MOBIL ~
PHILLIPS
F'B WELL F'ILES'
· "' R & D
· "-,- BPX
~ STATE OF ALASKA
· "~ TEXACO
ARCO ALASKA, INC.
P.O. BOX t0~36(}
ANCHORAGE, ALA~'K A
995i ~3
DATE- 8-tl-89
REFERENCE:
7-t2
7-23
9-8
I2-3
t2-7A
t 4-36
t5-tt
t7-8
PLEASE
ARCO CASED HOLE FINAL~
7-29-89
7-28-89
7-3~-89
7-26-89
8-4-89
8-4-89
7-29-89
7-3i-89
?-2?-89
F'RODUCTION F'ROFILE
PRODUCTION F'ROFILE
F'RODLJCTION PROFILE
INJECTION PROFILE
F'ERF RECORD
PERF RECORD
INJECTION PROFILE
PRODUCTION PROFILE
INJECTION F'ROFILE
N AND RETURN THE ATTACHED COPY AS
RECEIPT OF
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
RUN
DATA.
DISTRIBUTION
CENTRAL FILE£
~ PHILLIPS
CHEVRON PB WELL FILES
D & M R & D
EXTENSION EXPLORATION ~ BF'X
EXXON
~ STATE OF ALASKA
MARATHON
~ TEXACO
MOBIL
·
5'
5'
5'
5'
5'
5'
CAMCO
CAMCO
CAMCO
CAMCO
~CH
$CH
CAMCO
CAMCO
CAMCO
~, STATE OF ALASKA ~,i~..- j
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETIOI'I OR RECOMPLETION REPORT Al,ID LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE I~1 WATER INJECTOR
2. Name of Operator 7. Permit Number
ARCO A1 aska, I nc. 8:3-1
3. Address 8. APl Number
P. 0. Box 100360~ Anchorage, AK 99510 50- 029-210_~9
4. Location of well at surface 9. Unit or Lease Name
2085' FNL, 1055' FEL, Sec.9, T10N, R14E, UM Pr. udhoe Bav Unit
At Top Producing Interval 10. Well Number
2647' FNL, 2601' FEL, Sec.9, T10N, R14E, UM 14--~;
At Total Depth 11. Field and Pool
· 2621' FNL~ 25:30' FWL, Se¢.9, T10N, R14E, UM - Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
Prudhoe
Bay
0i
1
Pool
RKB 7:3' I ADL 28:~12
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
12/20/83 1 2/30/83 01/10/84*I N/A feet MSLI 1
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey [ 20. Depth where SSSV set 21. Thickness of Permafrost
9565'MD/9251 'TVD 9516'MD/9205'TVD YES [~ NO []I 2230 feet MD lqnN' (Annrn~
22. Type..IElectric or Other Logs Run
D I L/BHCS/SP/GR. LDT/CNL/Cal/GR. CBL; Gyro
23. CASING, LINER AND CEMENTING RECORD
, ,
SETTING DEPTH MD
CASING SIZE WT. PER FT. i GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20t' 91 .~# H-40 Surf -R0' 30" 375 sx PF I I
13-3/8" 77.N# I-RN .c;,,rf 9~,?R' 17-1/91, 9~Bn ~v l~,~n4,, ~ /~nn .~ E,~ r
'9-~._/.Fl" - b. 7:0# I-RN Surf 9066' 12-!/~.'' 500 :x Clasc n ,_ ~n0 s~ CS I
.
7'" ' .... 29.0# L-BO FlT~,1' 95¢,N' 8-1/~" ~n0 ~ Class G
.
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBIN~ RECORD
interval, size and number) Perforated w/4 spf SIZE DEPTH SET (MD) PACKER SET (MD)
5~2/4½" 8787 ' 8694 '
9161 ' -9191 ' MD/8876 ' -8904 ' TVD
9210 ' -9240 'MD/8921 ' -8949 'TVD 26. ACID, FRACTURE, CEMENT SOU E'EZE, ETC.
,
9250'-9270'MD/8958'-8977'TVD DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
9280 ' -9:308 'MD/8986 ' -901 2 'TVD N/A " '
,
27. PRODUCTION TEST
, ,,
Date First Production Method of Operation (Flowing, gas lift, etc.)
N/A
Date of'T~st Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE l GAS-OIL RATIO
TEST PERIOD I~
1
,
,
Flow Tubing Casing Pressure CALCULATED OI L-BBL GAs-McF WATER-BBL OIL GR~V'ITY-API' (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
* NOTE: Perforated well 8/26/84. Workover performed 6/16/88.
A~:~,,.~, ,'~j;
--
Form 10-407 (Dani) WC5/025
Submit in duplicatel~~.
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
29.
GEoLoGIc MARKERS. " .'
~ ~ i: ~' ' ':~ _' .~': i ';'~ '" ~ · '', ';' .-
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAs. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sadlerochit ' 9158t 88~3t None
0WC 9:392
Base Sad]erochit Not. Reached i .,
.
·
~ . -.
31. LIST OF ATTACHMENTS
None
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed //~~~~l'~L~ Title ^Ssoc, a~;e 'Encj, neet' Date ~/'~)/~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMM~oSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown ~
Alter Casing ~.' Other
2. Name of Operator
ARCO Alaska, inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
4. Location of well at surface
2085' FNL, 1055' FEL, Sec.9, TION, R14E, UM
At top of productive interval
2647' FNL, 2600' FEL, Sec.9, TION, R14E, UM
At effective depth
2624' FNL, 2548' FWL, Sec.9, TION, R14E, UM
At total depth
2621' FNL, 2530' FWL, Sec.9, TION, R14E, UM
11. Present well Condition summary
Total depth: measured
true vertical
12.
9565 ' MD
9251 ' TVD
13.
Effective depth: measured 9516'MD
true vertical 9205'TVD
Stimulate [] Plugging ~ Perforate ~ Pull tubing,l~
WORKOVER
Casing Length
Conductor 80'
Surface 2649'
Production 9040,
Liner 809'
5. Datum elevation (DF or KB)
RKB 73'
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
14-36
8. Approval number
8-377
9. APl number
50-- 029-21039
10. Pool
Prudhoe Bay Oil Pool
feet Plugs (measured) None
feet
Perforation depth: measured
Feet
feet Junk (measured) None
feet
Size Cemented Measured depth
20" 1965 # Poleset 80'MD
13-3/8" 2000 sx.Fondu & 2678'MD
400 sx PFC
9-5/8" 500 sx Class G & 9066'MD
300 sx CS I
7" 300 sx Class G 8751'-9560'MD
9161 '-9191', 9210'-9240', 9250'-9270', 9280'-9308'
true vertical
Tubing (size, grade and measured depth)
5½"/4½", L-80, tbg w/tail @ '8787'
Packers and SSSV (type and measured depth)
FB-1 pkr ~ 8694' & Bal-0 SSSV (~ 2230'
Stimulation or cement squeeze summary
N/A
Intervals treated (measured)
~ue Vertical depth
80'TVD
2678'TVD
8788'TVD
8493'-9246'TVD
8876'-8904', 8921 '-8949', 8958'-8977', 8986'-9012'
Treatment description including volumes used and final pressure
N/A
Prior to well operation
Subsequent to operation
Representative Daily Average Production or In(ech°n~0'atasCasing pre
Oil-Bbl Gas-Mcf Water-Bbl suCe' d '¥~¢blng Pres
14. Attachments (Workover Wel 1 History)
Daily Report of Well Operations ~]
Copies of Logs and Surveys Run []
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~'~) ~/)(.~/ .~/J~L ~L ~/ Title
Form 10-404 Rev. 12-1-85 ~
Asso¢i ate Engi neet
(Dani) SW03/009
Date
Submit in Duplicate
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started,
Daily work prior to spudding should be summarized on the form giving inclusive dates only.
District
kRCO ~LAS~ INC.
Field
PRUDHOE BAY FIELD
Auth. or W.O. no.
AS2262
ICounty, parish or borough
NORTH SLOPE
Lease or Unit
ADL: 28312
Title
WORKOVER
Lst.j~
J
Well no.
DS 14-3~
API: 50-029-21039
Date
Operator
ARCO
Spudded or W.O. begun
~CCEPT
Date and depth
ss of 8:00 a.m.
06/11/88 (
TD: 9565
PB: 9516
SUPV:RO
06/12/88 (
TD: 9565
PB: 9516
SUPV:RO
06/13/88 (
TD: 9565
PB: 9516
SUPV:RO
06/14/88 (
TD: 9565
PB: 9516
SUPV:RO
06/15/88 (
TD: 956E
PB: 9516
SUPV:RO
06/16/88 (
TD: 9565
PB: 9516
SUPV:TJ
Complete record for each day reported
WESTWARD RIG 1
06/10/88
IHour HRS
2000
IARCO W.I.
22.0000
Prior status if a W.O.
NU BOPE 7"@ 9560' MW: 8.5 SEAWATER
MOVE RIG F/ DS 13-34 TO DS 14-36. RU ON 14-36. ACCEPTED RIG
_
AT 2000 HRS 6/10/88. KILL WELL. BULLHEAD DOWN TBG AND ANN.
WELL ON VACU~ SET BPV. ND TREE AND NU BOPE. TEST SAME.
ND BOPE. LEAK BETWEEN TBG SPOOL AND BOPE.
DAILY:S31,350 CUM:$31,350 ETD:S31,350 EFC:$468,000
TIH 7"@ 9560' MW: 8.5 SEAWATER
TEST BOPE. PULL HGR TO FLOOR. OBSERVE WELL. PUMP HEC
PILL (100 BBLS). OBSERVE WELL. POOH-LD 5-1/2" TBG. RU AND
PU BHA AND RIH.
DAILY:S27,906 CUM:$59,256 ETD:S59,256 EFC:$468,000
POOH 7"@ 9560' MW: 8.5 SEAWATER
FIN TIH TO RETRIEVE PKR. CDL. FIN TIH. LATCH UP ON PBR.
WORK PKR LOOSE. POOH W/ FISH. PKR DRAGGING AND SWABBING.
LD PBR, PKR AND 2 JTS OF DP. MU BHA AND RIH. TAG LINER AT
9048'. POOH. .
DAILY:S27,906 CUM:$87,162 ETD:S87,162 EFC:$468,000
CIRC BTMS UP 7"@ 9560' MW: 8.5 SEAWATER
POOH LD BHA. MU 9-5/8" RTTS AND RIH TO 8730'. SET RTTS.
TEST CSG TO 3000 PSI (30 MINS). POOH W/ RTTS. MU BIT AND .
BHA AND RIH. SLIP DRL LINE. TIH TO 9503'. CIRC BTM~UP
THROUGH CHOKE DUE TO GAS AND C-193 IN SEAWATER.
DAILY:S44,430 CUM:$131,592 ETD:S131,592 EFC:$468,000
LD 3-1/2" DP 7"@ 9560' MW: 8.5 SEAWATER
CIRC BTMS UP. PUMP HEC PILL AND CIRC CLEAN SEAWATER. POOH.
LD BHA. RU DRESSER AND RIH W/ 8.5" GR/JB TO TOL. RD
DRESSER. MU BAKER PKR AND TAILPIPE AND TIH ON DP. SET PKR
AT 8680'. PRESS TEST PKR AND CSG TO 3000 PSI. POOH LD
3-1/2" DP.
DAILY:S40,552 CUM:$172,144 ETD:S172,144 EFC:$468,000
CHNG RAMS 7"@ 9560' MW: 8.5 SEAWATER
POOH. LD DP. PULL WB. RU AND RIH W/ 5-1/2" COMPLETION.
TEST SSSV TO 5000 PSI. CONTINUE RIH. STAB INTO
PKR-VERIFY W/ 500 PSI. SPACE OUT AND LAND TBG. CAN NOT
GET TEST ON TBG HANGER. CHANGING RAMS.
DAILY:S75,722 CUM:$247,866 ETD:S247,866 EFC:$468,000
The above is correct
Signature
For form prepar~on and distribution,
see Procedures llyl_anual, Section 10,
Drilling, Pages I~ -and 87.
Date [ Title
ASSOCIATE ENGINEER
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire
operation if space is available.
J Accounting cost center code
District I Stal~[K
ARCO ALASKA INC.
Field
ICounty or Parish
NORTH SLOPE
Lease or Unit
ADT,: 28312
Title
WORKOVER
Well no.
DS 14-~6
PRUD}{OE BAY FIELD
Auth. or W.O. no.
AS2262
Operator I A.R.Co. W.I.
ARCO 22. 0000
Spudded or W.O. begun I Date
ACCEPT I 06/10/88
Complete record for each day reported
WESTWARD RIG 1
50-029-21039
I otal number of wells (active or inactive) on this
ost center prior to plugging and ~
bandonment of this well
J
our ~ Prior status if a W.O.
2000 HRS
Date and depth
as of 8:00 a.m.
06/17/88 (
TD: 9565
PB: 9516
SUPV:TJ
RIG RELEASED 7"@ 9560' MW: 6.9 DIESEL
RIH. LAND TBG. TEST TBG AND ANN W/ 3000 AND 2500 PSI. SET
BPV. ND BOPE. NU TREE. TEST TO 5000 PSI. SHEAR OUT SOS AT
3900 PSI. SECURE WELL. RELEASE RIG AT 2000 HRS, 6/16/88.
DAILY:S46,905 CUM:$294,771 ETD:S294,771 EFC:$468,000
Old TD
New TD
Released rig Date
IPB Depth
Kind of rig
Classifications (oil, gas, etc.)
Type completion (single, dual, etc.)
Producing method Official reservoir name(s)
Potential test data
Well no. Date Reservoir Producing Interval Oil or gas Test time Production
Oil on test Gas per day
Pump size. SPM X length Choke size T,P. C.P. Water % GOR , Gravity Allowable Effective date
! corrected
The above is correct
Signature ~
For form pr,~rarati,on and distribution,
see Proced~s Manual, Section 10,
Drilling, Pages 86 and 87.
IDate JTitle
A,~5OOIATE ENGINEER
,.d
; .......... ,~:~-. ..... ~r.
Cons. Commission
.~n¢ora~e
STATE OF ALASKA '~-"
ALASI,,.. OIL AND GAS CONSERVATION COMM.,.,SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing ~
Time extension ~ Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~. Amend order ~ Perforate ~ Other"~,,,
2. Name of Operator 5. Datum elevation (DF or KB)
ARCO Alaska, Inc. RKB 73' feet
3. Address 6. Unit or Property name
P. 0. Box 100360, Anchorage, AK 99510-0360 Prudhoe Bay Unit
7. Well number
14-36
4. Location 2085 '
At top of 2647 '
At effective depth
2624' FNL, 2548'
At total depth
2621 ' FNL, 2530'
of well at surface
FNL, 1055' FEL, Sec. 9, TION, R14E, UM
productive interval
FNL, 2600' FEL, Sec. 9, TION, R14E, UM
FWL, Sec. 9, TION, R14E, UM
8. Permit number
83-163
9. APl number
50--029-21 039
10. Pool
FWL, Sec. 9, TION, R14E, UM
Prudhoe Bay Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
9565'MD
9251'TVD
feet Plugs (measured) N o n e
feet
Effective depth:
measured 951 6 ' MD feet Junk (measured) None
true vertical 9205 ' TVD feet
Casing
Conductor
Surface
Length Size Cemented Measured depth ~ue Verticaldepth
80' 20" 1965# Poleset 80'HD 80'TVD
2649' 13-3/8" 2000 sx Fondu & 2678'HD 2678'TVD
400 sx PFC
9040' 9-5/8" 500 sx Class G & 9066'MD 8788'TVD
300 sx CS I
7" 300 sx Class G
Production
Liner 809'
Perforation depth: measured
8751 '- 8493'-
9560' MD 9246' TVD
91 61 '-9191 ', 9210'-9240' 9250'-9270', 9280'-9308'
, . .
true vertical
8876 '-8904~
, 8921'-8949', 8958'-8977,, 8986'-9012'
Tubing (size, grade and measured depth)
5½" 17 O# L-80 tubing with tail ~ 8780'
Packers and SSSV (type and measured depth)
Baker FHL packer @ 8691', Camco Bal-O SSSV ¢ 2097'
12.Attachments Description summary of proposal ~L .. Detailed operations program
13. Estimated date for commencing operation
Au~lust 15~ 1988
14. If proposal was verballY approved
Name of approver ,-~ ~r,~w~ ~d- ¢7/(~//~_~ '~_~__~_ Date approved
_ .
15. I hereby certify that the foregoing is true and correct t(~ the best of my knowledge
Signed ~j~~q~ ~t,~~ Title Associate Engineer
Commission Use Only (.76) SA3:98
Conditions of approval Notify commission so representative may witness I Approval No. ~,~ -~
?
~ Plug integrity [] BOP Test [] Location clearanceI (,.-J -"
Returned _
-o
Approved by _ , _ ~ ~-c, mmi-_~;~inn~.~
Form 10-403 Rev 12-1-85
Date
by order of
the commission Date
S~,~bmit/in triplicate
P'-i
APPLICATION FOR SUNDRY APPROVALS
DS 14-36 (WAG) WORKOVER
PROCEDURE SUMMARY
OBJECTIVE: Retrieve existing 5-1/2" completion assembly and replace with
new plastic coated 5-1/2" tubing and permanent packer. Well will be cleaned
out to PBTD.
1) MIRU WW1. ND tree. NU BOPE and test.
2) Pull BPV. Check well for flow.
3) POOH w/5-1/2" tubing and seal assembly.
4) RIH w/3-1/2" DP and PBR retrieving tool.
5) Engage PBR and release packer. POOH w/packer and PBR.
6) RIH w/test packer and test 9-5/8" casing to 2500 psi. Test 9-5/8"
packoff to 3500 psi.
7) POOH. MU new 9-5/8" permanent packer on DP and RIH and set same.
POOH, LDDP.
8) RIH w/new 5-1/2" completion assembly.
9) Land tubing. Set BPV. ND BOPE. NU 5-1/2" 5M tree and test. Test
tubing and annulus to 3000 psi and 3500 psi, respectively.
10) Release rig. Turn well over to Production.
BHP: 3750 psi @ 8800'TVD (8.4 ppg)
Workover fluid: 8.5 ppg seawater
DCS/29b
5/4/88
ANNULAR
PREVENTER
§
ACCUMULATOR CAPACITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS $000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
I I
TUBIN6
HEAD
1. 13-3/8" CASING HEAD
2. 9-5/8" CASING HEAD
3. 5000 PSI TUBING HEAD
4. 13-5/8" - 5000 PSI BLIND RAMS
5. 13-5/8" - 5000 PS! PIPE RAMS
6. 13-5/8" - 5000 PSI ANNULAR
BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL.
2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS.
7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES.
O. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM
PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED
MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED
TO ZERO PSI.
10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND
LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 5000 PSI.
12, TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP.
13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN
AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY.
JG NOVEMBER 21, 1986
ARCO A!_.A,?KA: IN.r.'.,.
.i::,., l."l.., BOX
ANCI-IC!RAG[.:., ALA,?K A
.: .
DATF..' 4-7-88 --...
I.~'E'F.'ERE"_i',~CE-.' ARCO CAS'ED I--lf'.ll..F.~ I::' Il NA!..
P R' O D I I C 1' .1:. I') N I::' R f') I'-" :[ I.. I:.'
P r.;.' 0 D ! I (:.'. T T 0 N F' IR' F! F T !.. F
F' F: ['l l) ! ! F..'. 1' '!: F) N F:' R'. ri I::' ]: I.. F:'
F'RI]!/!.IF:T T fin F'K'FIF !: I..F
e !'? [:'.! D I !f':: T T_ I'] N !::' f;.' F.! !:: T. !.. !!.'.
T N. I E [.'. T T !1N F' F..' !'.! F' T I.. I:!'
F' R fi !) I.! f] T T. C) t'-J r.:, f;: f') F.:' !: !.. F!:
F:' F.' f:l ~') ! .I f't T T 0 H F' F..' f'! F T [ I--.
!_ IE A N r~ F.::'T' E F..'.".l" T f'~ N
]' N. t [.: It. 1' 1' Il FJ F' F;.' O F' T I. I::'
!::' I:;.' 01) ,. F:' !:;~'1:'1.. [!:-.-. f.'; ['~' / T E N P / I,I A T I![ R' HI.. I) U I::'
PI..EA,.%[? ,.'c.,']:.C-N AN]) F:E:'I'!!F.'K~ 'f'!'~[." A'I'TAF:HE:!) C?I:'Y A,.? !:;.'_F['.'F']'PT
R El [
^PR ! ]
HAVE A NICE DAY!
Alaska 0il & 6as Oons. Commissior~
F' F:: 6 f'..; Y f.:{ E N N E:'T' T Anchorage
A'T' !'i ~ r"" '? o
.... ~ _..~ ~... ·
¥) T :':'. 'f' R T 'R I 11' T (i
I:;'1 IN
I~'! IN
RI.IN
I~'!.IN
~R'I !N
RIIN
I:;.'. I.I N
RI. IN
R'! IN
!~'1 lt'-J
I:;.'I.IN
5"
5"
5"
5"
!:.~ .
n;"
I".A MFtI:!
(':AMf'tFI
P. AMf:I1
I:: A M F'.
f': A id f': f'!
EAM¢.I'I
I':AMCO
f": ~ H fi II
ARCO Alaska, Inc.
Prudhoe Bay Engineering
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4248
Donald F. Scheve
Operations Engineering Manager
April 1, 1988
C. V. "Chat" Chatterton
Alaska Oil & Gas Conservation Commission
3001 Porcupine Dr.
Anchorage, AK 99501
Subject: DS# 14-36 Permit No. 83-163
Dear Mr. Chatterton:
Attached is the Application for Sundry Approval as required per Rule 7 of Area Injection
Order No. 4 for the above referenced well.
Very truly yours,
D. F. Scheve
DFS:HGL
Attachment
Standard Alaska Production Co.
M. L. Bill, ATO 1550
L. L. Gantt, ATO 1520
P.-S. Pierce/E. W. Skaalure, PRB20
T. G. Zibell/J. D. Ottoson, PRB 24
PRB Files (14-36)
Oper. Eng. Files (14-36)
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C
STATE OF ALASKA
ALAS,.., OIL AND GAS CONSERVATION COMN,,,SSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other
2. Name of Operator 5. Datum elevation (DF or KB)
ARCO Alaska, Inc. 73' RKB feet
3. Address 6. Unit or Property name
P. O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit
4.
Location of well at surface
2085' FNL, 1055' FEL, Sec. 9, T10N, R14E, UM
At top of productive interval
2647' FNL, 2601' FWL, Sec. 9, T10N, R14E, UM
At effective depth
At tot, al depth
2621 FNL, 2530' FWL, Sec. 9, T10N, R14E, UM
7. Well number
DS 14-36
8. Permit number
83-163
9. APl number
50-- 029-21 039
10. Pool
Sadlerochit
11. Present well condition summary
Total depth: measured 9565 feet
true vertical 9251 feet
Effective depth: measured 9516 feet
true vertical 9205 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
80' 20"
2678' 13-3/8"
Plugs (measured)
Junk (measured)
Cemented
375 sx Permafrost II
2000 sx Fondu/400 sx PF "C'
None
Alaska Oil & Gas Cons. Commissio
Anchorage
Measured depth True Vertical depth
80' 80'
2678' 2678'
9066' 9-5/8" 500 sx Cl "G"/300 sx CS1 9066'
839' 7" 300 sx cl "G" 8271 '-9560'
8787'
8464'-9246'
measured
9161'-9191' MD; 9210'-9240' MD; 9250'-9270' MD; 9280'-9308' MD
true vertical 8876'-8903' TVD; 8921'-8949' TVD; 8958'-8977' TVD; 8986'-9012' TVD
Tubing (size, grade and measured depth) 5-1/2", 17#, L-80, 0-8685' MD (Plastic Coated)
4-1/2", 12.6#, L-80, 8685'-8780' MD (Plastic Coated)
Packers and SSSV (type and measured depth) Baker FHL Packer @ 8691'
Camco BaI-O SSSV Nipple @ 2096'
12.Attachments
Description summary of proposal J~ Detailed operations program [] BOP sketch []
13. Estimated date for commencing operation
N/A
14. If proposal was verbally approved
Mike Minder
Name of approver
Date approved 3/29/88
15. I hereby/certify th,at the foregoing is true and correct to the best of my knowledge
Signed
Date ¢~'/o¢"~''
Commission Use Only
Conditions of approval Notify commission so representative may witness I Approval No. ~ ~,~.-
.L~Z_~"~_e~hanJcal [] Plug integr!~y [] BOP Test [] Location clearanceI
Integrity Te~JJ
It is approved to cont~inue ~ater injection tillworkover operations commence
this fall. ~pproved Copy
Returr),eC¢ by order of
Approved by ORIGINAL SIGNED BY --~/--~/-~(~mmissioner the commission Date
Form 10-403 Rev 12-1-L~NNtE C. SMITH Submit in triplicat
INJECTION WELL ANNULAR COMMUNICATION
VERBAL NOTIFICATION OF AOGCC
PER AREA INJECTION ORDER #4
DATE:
TIME:
NOTIFIED BY:
REASON:
3-29-88
0915 hrs
Pam Pierce AOGCC CONTACT: Mike Minder
Injection Well 14-36 Annular Communication
Per Rule 7 Requirements of Area Injection Order No. 4
DISCUSSION: On 3-28-88 a CCL Icg identified the Baker FHL packer had failed and fell 28'
downhole to the liner top. Temperature/Spinner logs were inconclusive. No signs of 9-5/8" x
13-3/8" communication were evidenced during the logging operation. ARCO recommendation is
to place the well on water injection only until a workover can be scheduled.
AOGCC RESPONSE: OK to resume water injection on temporary basis (_+ one week). Sundry
Notice is required with approval for long term water injection until a workover can be planned.
Sundry Notice Req'd at this time? YES X NO
SIGNED:
PRODUCTION SUPPORT SUPERINTENDENT
Original to G. D. Herring/H. G. Limb - PRB #24
Production Support Superintendent (P. Pierce/E. W. Skaalure) - PRB #20
Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB #20
Field Area Operations Engineer (J. D. Ottoson/T. G. Zibell) - PRB #24
DS Supervisor - FS #3
FS Superintendent - FS #3
DS Engineer- ATO 1552 (M. R. Cook) R [CE~V iD
..
Alaska Oil & G~s Cons. ,.,on,~,~ ....... ~..
Anchora~
AFi'f.']O AI.A:.?I(A, TNF:,
¢.i :
R.I::'F:'IiilF~IENC[il · ARC:O I"'.'A,,) I::"T.') Uf..'llllF. I::' ]' NAI.
F" I;;.l {') T) I J C T ;1' 0 Ig H I::' I::' M / 'f' F.!'M I::'
H 1 S' C ;I; B I_. I!!; ('..; A,.'¢ I N, I / F:' Fi' 0 F:' ]' I. F:'
I:i'. I!:; C.: IE ]' ",/1.7:; l) B Y
ll"l A \,"[':; A N I C E .l.~ A Y !
D! ,5.,' T R T BI. IT
C A H f': r'l
.,-fi,: C':E'NTI:;.'.AI. F:']'!. Ii!;,'.';'
· "'.,,. C !"1F'V... I;: f'il N
l) * H
· '" _.F. X '}" E N..":,' .T R N F;.Y, r-:'l.. OR A'r T riN
HARA'f'HF..IN
~'! 0 B I L.
Pll-! T I...ll.. :r p s
F:' ~'{ L~ [:' I. Il. F ;1' I... IF. ~':
R k .r~
~:
E ,$;I'ATF' OF' AI..A,~'ICA
4[:
~Jas_k,~ Oil & .Gas Cons. Com$[s_s_[qtl
ARCO ALto.si(m, Inc.
P,O, Box i00~6r~
Anchorage, ALm.ska
99.51 (~
DATE: i (')-t 2-87
REFEF~ENCE: ARCO Cased
Ho I.e F:'ir, a t
t4-~6 9-26-87 Inject ion F'rofi L~,
Run t , 5"
PLease ~ign and re~u~e of
Received By_ 0
Gas Cons. C0mmiss[0~
l--IA V E: A N I C E AlaSk~ Oi~ & ~C~OT~B
Recor d.~ F'r oce~.~or
ATO--t 52~
da$.a,
TRANS ~875S~
Approved
DISTRIBUTION
C 8 fll ~ 0
Cen!raL Fi [e~ ~ Phi l[ip.~
Chevron PB WeL£ Fi Les
D & M R & I)
Extension E×p loraf ion ~ SAF'C
~ S+a~e of ALaska
E x x o ii ~ .
Marathon ~ ~ Texmco
Mob ~ t
.
o- ~ -~-'J:~-t:-:O 2T.'~:- , r'_.~ 'i['~.'.'-'~F':. Lo'g R:u"---'. ":
,:.._ c~ ,./., ,_, ~.:--~ ---S.!- .iff~ in ~ ~tu':..-v ~ ir.-_; _. F"r'c.','f ~ ,P,~n..._ "i
?- 'i 2 ~/ ~ - 2-- :-'-< 6 i :-:-- _.-; ,:-:c, c t; ,::: 'r., P r- c-- f ~. L e -'--: --:., '..-,. ':
i i i -_-? ~. z._.q..z. ~ ~' R ': 5 '
'=: :."-~ 'z'"/ S-'7-F:6 .~ ,: iec. ,-. ~ :_-,:,'::. ..... r'ro{'i [e R,'..~'..:': ".. ...
...... .-- ~ ? · - .--. - · , ,--~ ..
: .-._, 3---~--~i~: :.R iCrCT. ~C:,.i P'i-C,'-- ~ ;_~ ?'-..Ui'i 'i
i ~--'-? ,/ 5: -- C--'-'F~ 6 ]:-.,_~ec~ i.-::,'.,", "'..-:' ? c f Z [ e F: ,..~ ',-.,
· 'i3-i8/ ~::--9-86 Z'~-:]ect ~o'n fi"rofi ::_c-. F:,'_'..'.,-~
~ ~"---"-~'/-.. : Y-i--:_--:,-86 ~'~-.: ~E,,._-~ ~-:::,'r'~ i'--::'.,-c,-..:i ~_:.:_ $.'u'n
i 4-'---'S/ ~:-"::"-.'-'q?. :-:F' ~n. Lc.-,-] Z'.,"~] _...."-':",.-of~ Run i
i ~-27d' S--¥-~:A 2-~-~ ~ "~'r,e'_,- ."-.Tu',- ¥~:.-,. Run i _~-~''
i4-36/ ~-A-F.:A .i'-:-~ i---.--_-':c± i c,'r.: P':.-o~ } [e Run
i6-ii¥ S--iA-?-6 l-r~iection F'rot~ :e Run "- 5'
i6-i6'/ 12 ~ ,- _o:- -: ..... r~ .....
-.~o :_,=- ...... Lag. L.'-~'----vices ~... .... i
il. -Z. fO C: C..'
;.;a h'lC O
L, a [,'i "Z: C:
,.-.
L- ..-ii iii C C,
{.: .e ~, ,:: ':
~.]: a ;~'~ ..T. ,:3
'-i.1 -=': ~'i~ ,i (;~
C a ~iC 0
0 ± i _--.
CamEo
Ca ~r~c o
Pi.e..-:~se si.~'._<, a;-..d :-e+u}.-:.,-~ +h~ :':-::'{acv. E-d copy as- ?.-~cei[:"? of data.
/ JUN 0 1986
~..: H__~ ~...--. ~ ~ 0il & Gas Cons_ Co
Pl.'aC E 'T T; .~';":.
ARCO Alaska, Inc~
Post Office =Ox 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
Date:
Reference:
January 29, 1985
ARCO Pressure Data
/
3-11wPressure Survey
--tl-7 Static-Gradient
14-25~/Pressure Fall Out
~¥1~6!~essure Fall Out
14-26~Pressure Build-up
11-3-84 GO
1-11-85 Camco
1-7-85 Camco
1-7-85 Camco
11-16/17-84 Camco
n and return the attached copy as recipt of data.
Pam Lambert
ATO 1429C
Anchora~je
Trans 014
Chevron
D & M
Exploration Services
Extension Exploration
Texaco
Marathon
Mobile
M~bile E & P
Phillips
Prudhoe Bay Well Files
R & D
Sohio
State of Alaska
ARCO ALasl<a: .Thc
P.O.. 'c, ..
,..,o.,, i 00360
Anchorage: A L ~ _.--: i-.': a
9'.: _:- i 0
¥)ATF-.'- I)F. cembei" 24 : i oc.-..,,,
REF'r:~RENCE- ARCO Cased HoLe F in@Ls
D.S, S-4J. Ii-7-84
D ,. :'-"::-. ,. -~-'I'':;/~ .....
~.: -._. I I '- I --~-.~'"i
D,S,. '~-" ~ ''
,.., '~i '~'~ 3.-84
D ;? S-12 i i _.,-:, _ c:, ,-,
~'.', S S- t "'" ' -2--84
.... .. 'Ii
D,.,S'..~ .'5-'J3 i i--'~--,:::,.~¥
O.$'. '"-;--l"'" I I -'] ,-, ,-.,-,'
: ' ")_.; '")- 0 /~
D., ..c..,, 9_.j,,/ -~ .-_ ~ .......
I) %' c:.- ',>" ' ' '"'
....... ~: /- I ",-"~
D, ..,...,, 9-'4-"-- i i - i 8-84
I) v' 9 - '~.'--'"" ' '~-c)-84
· . ~. ~.:- ~. . .. I ~'..
D. S.'. o_~..'.-.. ~ / i ! -! 9-84
D ~" 9-6':' , ,-.,_' -~_.c:,
..~. I .-. 1--.
o_.-., u I 2-' I ;"' 84
t').S .... , ~.-
D e o_., c.-._,./ · ' O-8
~,:, ,- ~,.' ~2 .... i 4
D y t3-24,--'; i 2
D :";' i :5-'32 i 2-5-°'''' '~
·
·
· .-.~ r--., .'-- ,.
D, Y, i 4-~..:- i 2--6-~"~
D ~:; 14-'') '-' ~'''
. ,, i 2-6-o/`
.~ ,~ . I_: ~¥
D,. S ,. I 4-~:~:?" i 2-6-84
D, ~., i~.;- i i -- ,'~
~.ease sign and return
CFS/£'p inner Ru'.n i
C F,~,,'",,~ p i nr~er
l)-i f f T e m [.:, L o g I::..' u.'n i
Dif'F Temp F,'u.n I
CFS/Sp inner I:;.'. u'.r~ . i
CFS,/~p inner Run t
:~1 ...:; ..:., ..../- ., r- -.
[,rx/ VIc:. ,.
,?p i nne'F Log F;tun
c.~-.i :~'..- ..'r'c, F:.'.~n i
CN/ifiS-./GR Ru.n
SP inner Log Ru.'i"~ i
i'" :: i ," ~4 .'"
,_.In,,,.,, GF: Ru'n 'i
Ypi'nner l_og !:;,"u.r~ i
~.'nj ~' Pr of i Le/c:~'p i r~'ner R,,r,_. i
:'-; .... p ~ n n e r / T e mp. ,....-
Sp i 'nr~er/-Femp / I n J F'r c': I"' i [ e F;..' u'n i
i n i F'r o f
Sp i 'r'~ner L c:,a., t:;..'u',"~ i
Inj J::'rofi le/,S'F, i'nr~er/TemF, Ru.n
,_."-'FY/Sr.:-' inner F;: u.n i
D iff ]"em? Log F:u'n i
q:he a!:!'acl".,ed copy as rec:eiF, i' of clat:a.
Received By
HAVE A IqAF'F'Y NEW
i<eL t.y McFar Land
ATO--1 4. 2":,;',r-:'
:""" [; 0
I]- ['i
_
=:" [:, Fi
";" G i'i
=:"
="" G (:i
...:' . .
~... ~.
~..' u I)
#.:'
./r'r . C Fa iii C (3
"".'" i)A
")" C i'l (il C: Fi
I)A
.~.-
r-. II
"~" C ~ Ill C C)
.,~,
">" I-i .='t Ill C C)
r-T .. C ~.'J fi'i C fa
..! ...
"::" CalliC:O
...'
:::" C L:i i'il C 0
....-
· ') ,i C El ill [: 0
~..
c:' Il, ~...
..;. L., -.':i Ill C
I:~U "
..:. [-;0
I:,"' tt
.;. (; 0
D i S 'T' R l E-: U 'i" ]: 0 iq
Chevron
!) & M
Expi. orai'ion Services
Fx'l:en~ion Ex[:,Loration
Ex xon
Get -~ y
M a r a 't' h o n
Mob i L
M,::,bi i. E: & I:-'
F'hi Ll. ips
Pr udhc:,e I-'-',a'x' We L i.
i:;: & :[:'
Zoh i c:,
F:' i I. e :?
ARCO ALa~.l..'.a, Inc.
P.O. Box iOOS60
Anchoy'age, ALaska
DATE' D~'.c_. emhe'r' ,.~o, , ~,o;84
REFERENCE' ARCO Caz. ed Hole F
D S i--i '~ ~'~' 8 -- '.-;' 6 -- F:: 4 CCL,,q:-er
, · ~i ...... :" I'- ......
~ ~ ~' "__-2.. __,--~ 4 "- '~'
D S .S-4 i"i , o,..-, D'iTf ~emp L.o--::¢
D., £',. 3-1 t" i i -5-'-3--I. CF,S'/,S:p i ri'net
D S "-"'"8 ~ f i - i 8-84 "'""
..... .-'. ,_.m/M..'?/GR
D,,.,":',.4-S '~' ~: i --i 7--8"t CN/M5'/GR
D,. S ,. ':':-*_.. --,- .¢/ I 'i -i 4-84 CN/i"i;~-."/[,R
I), ":-.' ,. ",::-4--"-'- 8-";-',':;-':::'*. ,.., ... ,..:-., ['.'CL/Per f. Recc,-rd
D S.,' ¢-"-4-' o_.,-.,o_.,.:-.,, ,
.., ,..~/ ,., CET Log
I), S , 7--;~ i i -i 6-84 CN.,"M.°.../'r-:R_.
D S-. ,' i u '~'"" '~ 'i -'~ ...,--c,~ E':N/H.'-'-:/L,-F-.:
D., S, 7- i "-,'. ,¢-" ,,. i i - i 6-84 CN/H,S'/[;R
r:,,S,, i2-23'~' -~-~--3¢-84 F'ey'fora'ting Record
I),. ,".," ., i 2:-- 2 A -~""' i ¢ - c:,,.: - :.,':-:' -..,'"- f':.. C'_ L .,'" P e r I'- I:;'. e c o r d
D,. Z.. .,iq-iS---" ii-- '':' '':' - c:' '''~ ,.._ ,._,-.? Co I [ar/Perf_ Log
.,
,.:., '~--,- 56/' _. _.c:,, CCL/Perf Reco'rd
D S'- i,~ ":' c', 0-84 ,"- 'r
. . -.-, ?-i ,_.E,
D' ~'' I i 5-7. c:,,. - 'i' ,:.9--84 r'BL,..,., ,-'"'VD
D S-. '~ 7-6-/' i i --2-,qa ,'-'n..-".' ,',':',- i
....... ,-.., ,.:- .-' ,> ~-: , ~] 1] e !-
D ~.' i 7-8 '""" I i '"--84 r'.":'.-'., ,'r',...'
: -. -' -;' ,-,, ,.:. ,- ,.~ ~, I i-I i] e l-
~-" y..ign and re'-:::u':-'n The a'fi'ached copy 8:.::.': rer-eil.",i'
,--'7
HAVE A HAF'F'Y HOLIDAY SEASON!
Ke L t'.-.,-: Mc:Far La'nd ' Alaska 0il &
ATO-. i ..,.-'" ..;_":' '-7...:' ~-,
I I-,,~-.~r4,.:..,-,-'"'42i
o 'f' cI ,.'~ 't'a.
Chevro'r; Mob i L
I) & i~.i J'"i c:, !::, i I. E
ro , · .
r..xp i. ora 'r i c,'n :'-:err ices'. F:'h i I. I. ~ p:.::
Ex 4. e:.'-:~ -!.. i o'r: E x p L or .:_', 4( i r~'n F:"r' :..:. cl ~",
-. ~. C) r_...',
E x x ('.:', r., R &: D
Ge 4,.- t y ,S:c:,h i r.:':
i'd a '..," .:-', I' ~--
,: o'n £ ',.:: a 't' e .~:.', f
F' i I. e
ARCO Alask:-, .,t,_.
Prudhoe Bay Engineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
October 23, 1984
Mr. C. V. Chatterton
STATE OF ALASKA
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, AK 99501
DS 4-15
DS 14-31
DS 14-36
Permit No. 78-37
Permit No. 83-111
Permit No. 83-163
Dear Mr. Chatterton:
Enclosed are the Completion Reports for work done on the
above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/JB/mjb
Enclosures
cc:
SOHIO Alaska Petroleum Co.
File PI(DS 4-15)W4-3
PI(DS 14-31)W4-3
Pi(DS 14-36) W4-3
ARCO Alaska_ Inc. I,, ~. Subaldlarv of AllantlcRIchfleldCompany
-
'" ~ ~'-~ STATE OF ALASKA
ALAS,_ .,. ,.AND GAS CONSERVATION .. :vllSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
,,,
1. Status of Well Classification of Service Well
OIL[] GAS [] SUSPENDED[] ABANDONED [] SERVICE[~[ Water In~eqtor
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 83-163
3. Address 8. APl Number
P. O. Box 100360, A~chorage, AY, 99510 50- 029-21039
~. Location of well at surface 9. unit or Lease Name
2085' FNL, 1055' FEL, Sec.9, TION, R14E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
2647' FNL, 2601' FEL, Sec.9~ T10N, RlhE, UM 14-36
At Total Depth 11. Field and Pool
2621' FNL, 2530' FWL, Sec.9, T10N, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool
73' RKBI ADL 28312
12. Date SPudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
12/20/83 12/30/83 01/10/84 N/A feet MSLI 1
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost
9565'MD, 9521'TVD 9516'MD, 9205'TVD YES [~ NO [] 2115 feet MDI 1900' (Approx)
22. Type Electric or Other Logs Run
DIL/BHCS/SP/GR, LTD/CNL/Cal/GR, CBL, Gyroscopic Survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASINGSlZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5~ H-40 Surf 80' 30" 375 sxs Permafrost II
13-3/8" 72.0# L-80 Surf 2678' 17-1/2" Cmtd w/2000 sxs Fondu + 400 sxs PF "C"
9-5/8" 47.0# L-80 Surf 9066' 12-1/4" Cmtd w/500 sxs Class "G + 300 sxs CS 1
7" 29.0# L-80 8751' 9560' 8-1/2" Cmtd w/300 sxs "G" cmt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING R~CORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
9160- 9180' MD 5-1/2" 8780' 8700'
9287 - 9307' MD
9249 - 9268' MD Added on 8/26/84 26. ACID, FRACTURE, CEMENT sQuEEZE, E-I~C.
9229 - 9239' MD w/4 SPF DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
9209- 9229' MD Ref: CBL 1/5/84 N/A
9277 - 9287' MD
9614- 9616
27. N'/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED.k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CDR E DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
R£C 'i
Alaska 0il .
~.~a~ CDr,% Cor~[nis.s,/or/
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. ~ - ~ ~ : ~ ~. ~-~ ~' ~' 30 · ~ ~.~ ~, ..
NAME r · . - · ·
Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT-. DEPTH GOR, and time of. each phase.
. .
. _
_..
.
' ~op SadIeToch~t :. -9~8"_ '-8873' NO~
0/W Contact ~ -. 9392' 9090'
_.
Base Sadlerochit . Not Re~ :hed
.
,
.
31. LIST OF ATTACHMENTS
.
.
32. I hereby certify that the foregoing is true and correct ~o the best of my knowledge
Signed ~~~~~
INSTRUCTIONS
General' This form is designed-for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise Shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in' item 24 show the producing, intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
..~-, STATE OF ALASKA
ALASKA ~, AND GAS CONSERVATION C( ~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL [~×
OTHER []
Water Injector
2. Name of Operator 7. Permit No.
ARCO Alaska, Inc. 83-163
3. Address 8. APl Number
P.O. BOX 100360, Anchorage, Alaska 99510 50- 029-21039
4. Location of Well (Surface)
2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM
(Producing Interval)
2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM
(Total Depth)
2621' FNL, 2530' FWL, Sec 9, T10N, R14E, UM
I '
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
73' RKB ADL 28312
12.
9. Unit or Lease Name
. Prudhoe B~y Unit
10. Well Number
DS 14-36
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations C~ Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Began perforating operation 8/26/84. RU perforating unit, pressure tested surface
equipment. RIH with gun #1, shot 9160-9180' MD 4 spf, flowed well to separator
for cleanup, monitored rate, and took shakeouts. POOH - all shots fired. RIH
with gun #2, shot .928~-_93~7.' MD 4 spf, flowed well. POOH - all shots fired. RIH
- .
with gun #3, shot 9249-9269' MD 4 spf, flowed well. POOH - all shots fired. RIH
with gun #4, shot 9229-9239' MD and 9180-9190' MD 4 spf, flowed well. POOH - all
shots fired. RIH with gun #5, shot 9209-9229' MD 4 spf, flowed well. POOH - all
shots fired. RIH with gun #6, shot 9277-9287' MD 4 spf, flowed well. POOH - all
shots fired. RD. Secured well 8/28/84.
DS 14-36 is a source water injector in the Prudhoe Bay Waterflood Area. The well
began receiVing water on 9/23/84.
Ref: CBL 1/5/84
14. I hereby,,ce, rtify that the foregoing is true and correct to the best of my knowledge.
Si§ned ...... ~ litle Regional Engineer
The space below for Commission use
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc_
Prudhoe Bay Engineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
October 17, 1984
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
Re:
DS 4-15
DS 14-25
DS 14-27
DS 14-31
DS 14-36
Permit No. 78-37
Permit No. 83-102
Permit No. 83-170
Permit No. 83-111
Permit No. 83-163
Attached are "Subsequent" Sundry Notices for work completed on the
above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/JB/la
Attachments
cc: Sohio Alaska Petroleum Co.
File PI(DS 4-15)Wl-3
File PI(DS 14-25)W1-3
File Pi(DS 14-27)W1-3
File PI(DS 14-31)W1-3
File PI(DS 14-36)W1-3
Alaska Oil & Gas Cons. Commission
Anchorage.
AR~.~ AI~=I~= Inn In n Suhnldlnrv of AtlantlcRlchlleldCompany
STATE-OF ALASKA
ALASKA'~-''. AND GAS CONSERVATION C(-"MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL I~x
OTHER []
Water Injector
2. Name of Operator 7. Permit No.
ARCO Alaska, Inc. 83-163
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50- 029-21039
4. Location of We, (Surface)
73' RKB
12.
2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM
(Producing Interval)
2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM
(Total Depth)
2621' FNL~ 2530' FWL, Sec 9, T10N, R14Eo UM
Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No.
I
ADL 28_ql 2
Check Appropriate 8ox To Indicate Nature of Notice, Report, or Other Data
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
DS 14-36
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
[]
[]
[]
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations I~ Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Began perforating operation 8/26/84. RU perforating unit, pressure tested surface
equipment. RIH with gun ~1, shot 9160-9180' MD 4 spf, flowed well to separator
for cleanup, monitored rate, and took shakeouts. POOH - all shots fired. RIH
with gun #2, shot 9287-9307' MD 4 spf, flowed well. POOH - all shots fired. RIH
with gun #3, shot 9249-9269' MD 4 spf, flowed well. POOH - all shots fired. RIH
with gun #4, shot 9229-9239' MD and 9180-9190' MD 4 spf, flowed well. POOH - all
shots fired. RIH with gun #5, shot 9209-9229' MD 4 spf, flowed well. POOH - all
shots fired. RIH with gun #6, shot 9277-9287' MD 4 spf, flowed well. POOH - all
shots fired. RD. Secured well 8/28/84.
DS 14-36 is a source water injector in the Prudhoe Bay Waterflood Area. The well
began receiving water on 9/23/84.
Ref: CBL 1/5/84
14. I hereby,~6trtify that the foregoing is true and correct to the best of my knowledge.
e ,ona= .n ,nee,
The space below for Commission use
Date
Conditions of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1 ~0
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO A£a.ska, Inc,.
P.O. Box ~OOS60
Anchorage, ALaska
DATE- ,~eptember t3, ~984
REFERENC'.E' ARCO F:'re~s'ure Data
· $ · 2-~ A'---~ '7-22--84 '<PBU:
,~..~--7-22-84 ~D.~ R_..
· .m
S 7-2 7-26-84 ~ F'B~.~
7-4-84 CDBR
~2 ~9 ~''6-28-84
6-28/2~'-84 CDBR
i4 36-~' 8-27-84
~ . - ~,at Jc 3'urvey
7-7-84 CDBR
C 8 fll C 0
C a m c o
GO
C El IlIC 0
HAVE A NICE DAY!
Kel. ty McFarLand
ATO- ~ 4'~9F~.
TRAN~. ~35~ -
o f r.I a t a,
DI~'TRIBUTION
Chevron
Exp Lorat i on 5'err i ce~
Ex tens i on Exp Lora t i on
Ex xon
Getty
Marathon
Mob i ]
Mobil E & F'
Phi L L i p.s-
F'rudhoe Bay WeLL
R&D
5'oh i o
State of ALaska
F:'i Les
! -
ARCO Alaska, Inc.
Post Office L 100360
Anchorage, Alaska 99510
Telephone 907 265 6375
E. M. Pringle
Vice President
July 31, 1984
Mr. Robert S. Burd
Director, Water Division
U. S. Environmental Protection Agency
Region X
1200 Sixth Avenue
Seattle, Washington 98101
RE: Prudhoe Bay Eastern Operating Area
Underground Injection Control Permit
~ 1 G~!OL
~--2
,.,-~ G[-~LT
ST~..T T_~C '-
STAT TEC '-
, CONFER:
FILF;
--
Dear Mr. Burd:
Please be advised ARCO Alaska, Inc. intends to initiate water
injection into Wells 14-25, 14-27 and 14-36 on or about August 12,
1984. These wells were included in our area permit application
dated June 20, 1984, supplemented by our letter dated July 10,
1984.
I certify under the penalty of law that I have personally
examined and am familiar with the information submitted in
this document and all attachments and that, based on my
inquiry of those individuals immediately responsible for
obtaining the information, I believe that the information is
true, accurate, and complete. I am aware that there are
significiant penalties for submitting false information,
including the possibility of fine and imprisonment. (Ref. 40
CFR 144.32)
Sincerely,
Vice President
Production & Drilling Operations
EMP/JLG/la
cc: C. V. Chatterton
Alaska Oil and Gas Commission
Gerald Opatz
EPA, Seattle
Jean Parson
Sohio Alaska Petroleum Co.
File 3.5-2
RECEIVED
AUG 0 2
Alaska 011 & Gas Cons. Commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
ARCO Alaska, Inc. ~"~
Prudhoe Bay~ .~ineering
Post Office Box 360
Anchorage, Alaska 99510
Telephone 907 263 4248
Donald F. Scheve
Regional Operations Engineer
July 18, 1984
Mr. C. V. "Chat" Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Chatterton:
Re: DS 14-25
DS 14-27
DS 14-31
DS 14-36
Permit No. 83-102
Permit No. 83-170
Permit No. 83-111
Permit No. 83-163
Attached are "Notice of Intention" Sundry Notices for work
proposed on the above-mentioned wells.
Very truly yours,
D. F. Scheve
DFS/WT/lmh
Attachments
cc: Sohio Petroleum
File Pi(DS 14-25)Wl-3
File Pi(DS 14-27)Wl-3
File Pi(DS 14-31)W1-3
File Pi(DS 14-36)W1-3
ARCO Alaska, Inc. Is a Subsidiary of AtlmntlcRIchfleldCompany
STATE OF ALASKA -~.
ALASKA ,. AN D GAS CONSERVATION C(. MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL []
COMPLETED WELL []
OTHERXI29
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, Alaska 99510
4. LocationofWell (Surface)
2085' FNL, 1055' FEL, Sec 9, T10N, R14E, UM
(Producing Interval)
2647' FNL, 2601' FEL, Sec 9, T10N, R14E, UM
(Total Depth)
2621' FNL, 2530' FWL, Sec 9, T10N, R14E, UM
5. Elevationinfeet(indicateKB, DF, etc.)
73' RKB
6. Lease Designation and Serial No.
ADL 28312
7. Permit No.
83-163
8. APl Number
5O-- 029-21039
9, Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
DS 14-36
11. FieldandPool
Prudhoe Bay Field
Prudhoe Bay Oil Pool
12.
(Submit in Triplicate)
Perforate ~ Alter Casing [] Perforations
Stimulate [] Abandon [] . Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each coml~letion,)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
[]
[]
[]
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
propo~d work, for Abandonment see 20 AAC 25.105-170).
ARCO Alaska, Inc. proposes to perforate DS 14-36 in selected intervals within the.
Sadlerochit Sand of the Prudhoe Bay Unit. All wireline work will be done through
a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface
pressure. The SSSV will be installed at the conclusion of the perforating and
clean-up operation.
Proposed Perforation Intervals:
Ref: BHCS 12/31/83
9161 - 9191' MD (30')
9210 - 9308' MD (98')
DS 14-36 is a water injector in the Prudhoe Bay waterflood area.
Sub~ctuent Work
14.1 here~tify ~/~~regoingTue and correct to the best of my knowledge.
.~~ ~ /~'3 ~, ~7~ Regional Engineer
Signed. . ' ( Title
The space below for Commission use/
RECEIVED
JUL 2 1984
Alaska 011 & Gas Cons. Commission
Anchorage
Conditions of Approval, if any:
Approved by. COMMISSIONER the Commission
Approved Copy
AP -~eturned ,
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc.
Post Office.,-~..p. x 360
Anchorag~ iaska 99510
Telephone 907 277 5637
April 2, 1984
Reference' ARCO Cased Hole Finals
D.S. 3-25 ~' 12-2-83 ACBL/VDL/Signature/GR
D.S. 3-26f 11-10-83 ACBL/VDL/S ignature/GR
D.S. 13-19 /' 12-28-83 EPL
D.S. 13-21~' 1-2-84 EPL
· D.S. 13-98~' 3-7-84 CPL/GST Run 3
D.S. 1.4-7 ~ 3-3-84 Temperature
D.S. 14-36/' 1-5-84 CBL/VD
Run 1 5" DA
Run 1 5" DA
Run 2 5" Sch
Run 2 5" Sch
5" Sch
Run 1 5" Otis
Run 1 5" Sch
~se sign and return the attached copy as receipt of data.
HAVE A HAPPY EASTER!
Kelly McFarland
ATO-1429F
Trans. # 124
DISTRIBUTION
Chevron
D&M
Dallas
Drilling
Ext. Exploration
Exxon
Getty
Marathon
Mob i 1
Mobil E & P
Phillips
Prudhoe Bay Well Files
R&D
Carolyn Smith
Sohio
State of Alaska
ARCO Alaska, Inc.
Post Office~c~x 360
Anchorage, ~ska 99510
Telephone 907 277 5637
March 7, 1984
Reference: Arco Magnetic Tapes
14-36---2-20-84
D.S. 14-27 2-22-84
D.S. l-lA~ 1-30-84
D.S. 12-26/ 2-24-84
CORRECTED OH # 123183 w/listing GO
CORRECTED OH #228638 w/listing GO
OH #68974 w/listing
OH #252538 w/listing GO
Run 1
Sch
/~" Please sign and return the at~ached copy as receipt of data ·
Happy St. Pats Day
Kelly McFarland
ATO-1429F
Trans. # 088
DISTRIBUTION
Chevron
D&M
Dallas
Drilling
Ext. Exploration
Exxon
Getty
Marathon
Mobil
Mobil E & P
Phillips
Prudhoe Bay Well Files
R&D
Ca r ° 1 yn~h / ~/~/9~ ~ !~~~/~_~
~$t.-a~l:eL.e~' Alaska~
A!zs~ Oil & G~s Cons. Commission
GEARHART INDUSTRIES, INC.
February 29, 1984
Arco Alaska Inc.
P.O. Box 6247
'Anchorage, Alaska
To Whom It May Concern'
RE: L.I.S. Tapes for DS 14-36
Please disregard previously delivered L.I.S. tapes on the above well
because the digitized repeat section was recorded from the field instead
of the main run section. The enclosed tapes were redone with the main
run section recorded.
Sorry for any inconvenience.
Regards, ~ -- /3-?z/f ~
David Douglas
DWD/sjt
Enc.
ECEI'VED
MAR 1 21984
.... "'~'
Post Office Box 102436 Anchorage, Alaska 99510 Telephone 907-562-2538
, , ~*~'-; STATE OF ALASKA
ALAS~ ...... L AND GAS CONSERVATION '.MISSION
WELL COMPLETION OR RECOMPLETIOh. REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE ~ Water Injector
2. Name of Operator 7. Permit Number
ARC0 'Al aska, Inc. 83-163
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21039
4. Location of well at surface m - 9. Unit or Lease Name
2085' FNL, 1055' FEL, Sec.9, T10N, R14E, UM JL:%C,"-'.TiONSI Prudhoe Bay Unit
At Top Producing Interval r 10. Well Number
2647' FNL, 2601' FEL, Sec. 9, T10N, R14E, UN Surf.
, -__I___ 14-36
At Total Depth i B. H.~ 11 . Field and Pool
2621' FNL, 2530' FWL, Sec.9, T10N, R14E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i I Pool
7~' RKB ADL 28~12
-
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
1 2/20/8:3 12/:30/83 01/10/84I N/A feet MSL 1
17- Total Depth (MD+TVD) 18. Plug Back Depth (MD+-['VD} 19. DirectionalSurvey ] ~;~);p~whereSSSVse' I 21. Thickness of Permafrost
9565'MD,9251 'TVD 9516'MD, 9205'TVD YES CZ] NO [] N 2115 feet MD 1900' (Approx)
22. Type Electric or Other Logs Run
DIL/BHCS/SP/GR, LDT/CNL/Cal/GR, CBL, Gyroscopic Survey
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE; WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surf 80' 30" 375 sxs Permafrost II
13-3/8" 72.0# L-80 Surf 2678' 17-1/2" Cmtd w/2000 sxs Fondu + ~D0 sxs PF "C"
9-5/8" 47.0# L-80 Surf 9066' 12-1/4" Cmtd w/500 sxs "G" + 300 sxs CS I
..
7" 29.0# L-80 8751' 9560' 8-1/2" Cmtd w/300 sxs "G" cmt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
NONE 5-1 / 2" 8780' 8700 '
2~. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/^
27. N/A PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL cHOKE SIZE IGAS-OILRATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE *
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
FEB 2 '-s
' - - '- *..~'DH-
A,,i2;'.'.,~ 0i! ~ u;J.,, .¢.,L5.',.'].S,
Form 10~,07 Submit in duplicate
Rev. 7-1-80 DRN/WC06 CONTINUED ON REVERSE SIDE
;..' r: . .; -.---~1 ,--GEC~LOGic:M-~-Ri~E.~'$.~ -: :? ~:. '-; ,-: ~t~;: ' 'i: _' ~' :;;:;:'.'~?-!. -'-"' ; ' ".:~ ~ :FoRMAT'iON.T,,~STS:
.
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Sadl erochi t 9158' 8873 ' NONE
O/W Contact 9392' 9090'
Base Sadlerochit NOT REA~ HED
31. LIST OF ATTACHMENTS
Drilling History, Gyroscopic Survey (2 copies)
32. I hereby certify that the foregoiT/sj~ true and correct to the best of my knowledgeArea Drilling Engr. ~, ,~/~--,~
Signed ?~'L/', v Title Date ~- .
. i -/
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: FlowinD, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
DS 14-36
DRILLING HISTORY
NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2"
hole to 2708'. Ran 69 jts 13-3/8,' 72#/ft~kw/FS @ T2,6~7+8~' Cmtd 13-3/8"csg
w/2000 sxs Fondu + 400 sxs PF "C". ND 20" 'h~ytlril.~..~..d' 13-3/8" packoff &
tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500
psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new
form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to
9081'. Ran 226 jts 9-5/8" 47#,/Nw/FS @ 9066'. Cmtd 9-5/8" csg w/BOO sxs "G"
cmt. Tstd csg to 3000 psi _o~.t Drld FC & cmt. Tstd csg to .3000 psi - ok.
Drld FS & 10' new f~r~orm. Ts%d form to 12.5 ppg EMW - held 12.0 ppg. Drld
8-1/2" hole to~565_~(12/20}83'), Ran DIL/BHCS/SP/GR f/9560' - 9050'.
~.LDT/CNL/Cal/GR f/95-60' - 90-§OJ'~? GR to 2600'. Arctic packed 9-5/8" x
13-3/8" annulus w/300 sxs CS I + 128 bbl A.P. Ran 20.jts 7" 29#/ft,Af/8751'
- 9560'. Cmtd 7" lnr w/300 sxs "G" cmt. Drld cmt to 9516' PBTD~.~ Displ
well to NaC1. Run CBL f/9516' - 8500'. Ran 5-1/2" completion assy w/tail @
8780' & pkr @ 8?00' & SSSV @ 2097' Tstd hanger and packoffs to 5000 psi -
ok. ND BOPE. NU tree & tstd to 5~00 psi - ok. Displaced well to diesel.
Dropped ball & set pkr. Secured well & released rig @ 2000 hrs, 01/06/84.
DRN/DH53-tw
ARCO AI,ASKA~ INC:.
D'."-; lq-~ WELL NO: 36 SIGMA-.GYRO dOB NO: AO184RO405-NZ
PF~I...IDHOE BAY, NORTH SI...OPE~ ALASKA
'.:3IGMA-GYRO~ 0.....'.--.~516 M.l]~ SURVEYOR: CORAM/dAHN., DATE RUN: 10"-dAN-84
'...=.:IGMA 175 NO: 662, PROBE NO: 0/.:,4
I::'OF;:E',_--;IGHT: N 1.4, 46 W
:'-':;URVE:"Y TAI<EN F'ROM WEI.,..I_HEA[I
VERTICAl... SECTION CALCUI_ATED IN F'LANE OF PROPO::;AL
DIRECTION: '.3 66 DEG....,":'1 MIN. W
RECORD OF SURVEY
RADIL.IS OF RURVATURE METHOD
ARCO AI_ASKA, INC,,
D:=; 14, WELL NO: :36. SIF~MA.-GYRO
PFdJ[IHOE ~AY~ NOR].'H SLOPE::., ALASKA
,J 0 B N 0: A 018.4 R () 405.-N Z
C: 0 H F:'U ]"a T I 0 N
.T...I~'I E DATE
13 ". 54. -" 11 18- ,J A N - F-: 4
F' A,.':; E N (:ii.
'1 '
HEAF:URED DF:: I F'T E R ! FT
DE;PTH ANGL. E. D I REC:T T FIN.. L. ENGTH [~ EF ' TH
F' E E T D H D M F E E T F E E T
TRUE
COURSE VERTICAL VERTICAL SLIBSEA R E C: T A N G U L A R C L 0 S U R E DOGLEG
SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTIOI',I SE:VEERIT
FEET FEET FEET FEE]'' D M DG/100F:'
0. 0 0 () 0 (). 0.00
.1. 00. 0 /=. S 2,6 0 W 100. 1 ()0.00,
2()0,. 0 4 S 5:3 1 E 100. 200.00
:::.:00. 0 7 S 49 14 E 1 CDC). :-=:C)0.00
40,0,. 0, 6 '.3 .'=55 4 E 100., 4 C) 0.0()
!::~,(')(') (') /=, '"' 66, =~"' . ....
....... ;=, .. 7 E 100 .':;~00 o0
600. 0 8 S 67 16 E 100. 600.00
'70(). 0 8 '.:; ::2 28 E 100. 700.00
800. 0 11 N 84 56 E 100. ::',00.00
900. 0 1 ::: N 6,:z: 6, E 100. ',-'.~00,, 00
0.00 =69.00 0.00 0. ()0
0.07 .31.00 0.08 '.-]; 0.04 W
O. 10 '1. :.7..' .'1.. 0,0 O. 24 S Cf,. 00 W
0.02 2:.:: 1. O0 0. :34. S (). 12 E
· -0.07 :3:31.00 0,46 S 0,2'7 E
-0.18 431.00' 0.55 S 0.4.3 E:
-C) '" ~"-'
· :, 1 I C) C) ('I, 62 ':'
. ._,.:, ..... 0.61 E
-0.50 6, :31.00 0.68 S 0.84 E
-0.75 731.00 0.69 S 1. 12 E
-1.18 8.31.00 0.57 S 1.53 E
0.00 0 0
0.09 S 26. 0 W
0.24 S 0 5:6 W
0.36 S 19 56, E
0,.~':'. ._ ._, '.3 .... '--'c.) :]'.,,'.-], E
0.70 S 38 28 E
0.87 S 44:33 E
1 o¢.~ ':' ~0 54 E
I :32 :=; .=,'::' ":'
. · ....,.1E
1.6,4 '._=: 6.9 33 E:
0.00
0. 10
0.11
0.05
0.02
0. (.)
O. 03
O. 04
0. ()7
0.14
1000.
1100.
1200.
1:300.
1400.
0 19 N 54 51 E
0 13 N 4(:) :B1 E
0 11 N 2' 48 E
() 10 N ], 15 E
0 8 N 38 28 W
100. 1000.00
100. 1099.99
1 O0. 1199. '.:.~'.'.-~
100. 1299.99
100. 1399. '.-.'¢9
-1.73 9:31.00 0.28 S
-2.18 1030.99 ' 0.03 N
-'2, 44 11:30.9'..7..' 0. :37 N
-2, 57 1230, 9'9 0.6".:'/ N
-2.6.0 1330. '79 O, 95 N
2.01 E
2.36 E
2.49 E
2.51 E
2.42 E"'
2.03 S 81 56 E
2.36 N 89 14 E
2.52 N 81 29 E
2.60 N 74 37 E
2.60 N 68 30 E
0.0.5
0.12
0. 14.
0.02
0. 1 '2
:L 500.
1600.
1700.
1800.
1900.
2000.
2100.
2200.
:2300.
2400.
17 S :E:9 19 W
':"7 '.:; .~,::: ".'-'"=-' W
2:=: '..:; 57 11 W
26 S 40 54 W
2.6,. S 31 57 W
0 31 :E: 12 52 W
1 5 '-:-'; 12 10 W
I I :3 16 2:2 W
I 5 S 1 I 26 W
i 1 :_:: ':.' 21 W
00. 1499.99'
00. 15'? 9.99
00. 16,99.99
00. 1799.99
00. 1 :_::99.98
100. 1999.98
100. 2099. '.--./7 .
100. 2199.95
100. 2299.94
100. 2399.92
-2.36 1430.99
-1.79 1530.99
-1.14 16,30.99
-0.43 1730.99
0.25 1830.98
0.85 19:2:0.98
I. 6:--: 20.30.97
2. :31 2130.95
· 3.93 2230.94
4.86 2330.92
1.11 N
0.95 N
0.60 N
o. 10 N
0.52 S
1.:30 S
2.68 S
4.47 S
6,.25 S
8.08 S
2.09 E
1.54 E
0.99 E
0.42 E
0.04 W
0.36 W
0.67 W
1.1:3 W
1.57 W
1.79 W
2.37 N 6,2:10 E
1.81 N 58 2:_,' E
I. 15 N 58 48 E
0.43 N 76, 0 E
0.52 S 4 39 W
1.35 S 15 40 W
2.76 .S 14 :--: W
4.61 S 14 9 W
6.45 S 14 5 W
8.27. '.S 12 29 W
0.2:B
0.20
0.02
0. I:B
0. r )
O. 1:9
0.55
0. 10
0. 11
0. 18
2500. i 1. '.-; ].1 18 W
26,0o. (') 56, .'=; 1.5 10 W
:270('). 0, 45 S /=, '=..".=..' W
2:E:00. 0 4.4 S 5 56 E
2900. · 0 26. '.:~ 6 49 E
100. 2499.90
100. 2599.89
100. 2699.88
100. 2799.87
t 00. =.'. 89 9.8 6.
5.76: 2430.90
6.78 253(3.89
7.6.2 2630.88
:3. 14 2730.87
8.4- 4 28:=:0.86,
9.84 S
11.51 S
12 97 ¢'
] 4.26 ',3
15.29 '.-_.;
~_.":' 00_ W
2. :39 W
2.67 W
2.68 W
· --' F,/-, W
10.04 c._, 11 c.,,-}~_. W
11.76 :3 11 45 W
13.24 S 11 .=-:8 W
14.51 S 10 3:.:: W
15.50 S 9 .31 W
0.16.
0. 10
0.2:_=:
0. 16
0.30
AF"¢CO ~I.._A:BK ~., ! N F:.
:D S 14.~ 14 E L L. N 0: 3. 6 c:...., 113 FI ~-'-G Y R lEI
F'RI_IDHOE B~Y~ NORTH SLOPE~ AL.~SF'.'.'~
,..lOB NO: AO184RO405-NZ
COMPUTAT I ON
T I ME DATE
13: 54: I 1 18-,..lAN-:=:4
· ,,
PAGE NO. 2
TRUE
MEASIJRED DR IF'F DRIFT COURSE VERTICAL VERTICAL :=:LIBSEA R E C T A N G U L A R C L 0 S LI R E . DOGL. EG
DEPTH ANGI_.E DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION '.SEVER
FEET D 1'4 D M FLEET FEE"r FEEl" FEET FEET FEET D M DG/1
:3000. 0 28 S 6:34 W 10(). 2999.86 8.75 2930.:96 16.07 S 2.56 W
:3100 0 '="2 '=' o.-., 4. E .16)0 :30'2'?~.86 o ?4 :=:¢x=:A ~"/- :2 46 W
· ...... ._ ................. c .... 16, 78 ..., ¢' .
:3200. () '2 S :3:3:3:3 W 100. :3 :t 9',.}. 86 9.15 :3130. :=:6 17. i.!:2 S 2.5(3 W
:3:300 .............. 0 6 ¢' 40 4. 7 E 100 22'.]'~'-':'¢ '-':,_,~.9 ..... ..'-":':~: 2 ::: ¢) .86 17 45 ._,c. .....-, .4:=: W
:..-:: 400. () ! 0 S :2 :=: :37 E. 100, :3:3'..=' 9.86 9. 1 :=: :'-: :3 :.".': 0, :=: 6 17.67 S 2. :.--: 4 W
:'::.~A() 0 7 S 4.0 ._ 7 E :1 (')0. :::49'-}. 86 9 1:3 34.:3() 86 17. o,:, .'=, 2. 18 W
:360(). 0 12 S 32 2:3 W 100. :3599.85 9.:;:.'2 3530.:=:5 18. 15 S 2. t6 W
:3700. 0 1:3 S 83 :=: W 10(). 36'29.85 9.58 3/=,30.85 18. :_-:5 S 2.47 W
3800. 0 17 S 85:35 W lc) 0. :37'79.85 10.00 3730.85 18.:39 S 2.92 W
:3'F/00. 0 4.2 '.="; 65 29 W 100. 38'.=.rF~.85 10.86 3830.,c_:5 18.61 S 3.7.6 W
16. :27 :..-.-; '-.?. ._,":' W 0 .11
16.96 :-]; :=: 20 W ' 0.2 ::-':
17.40 S 8 15 W
17./=,:--: ':'._,o,_, 6 W
17.:=:2 S 7:32 W
18.02 '._=;6 58 W
18.28 S 6 4:..3 W
18.51 S 7 40 W
18.62 L=; 9 I W
18.98 S 11 26 W
0.32
0.16
O. 07
0. C, )
0.2()
0.1 '?
0.06
0.45
4000. :3 5:3 S 6'P 20 W
4100. 8 4 S 68 4,6 W
4200. 11 :34 S 63 0 W
43A0. 15 38 S 62 :'::6 W
44-00. 17 5:=:' S 56 53 W
1 O0. 3°?'.~'.-.-~. 76
1 PO. 409'2.1 ~
100. 4197.71
100 · 4294.88
100. 4390.60
14.89 39:30.76
25..~:0 4030.19
42. :36 4128.71
65 · 83 4225.88
~4.52 4321.60
20.15 S 7.47 W
23.88 S 17.21 W
30.:E:5 S 32.78 W
41·5'::? S 53.70 W
56.15 S 7:9.67 W
21.49 S 20 21 W
29.44 S 35 47 W
45.01 .'iS 46' 45 W
67.92 S ~".) 1..5 W
"P6.6..5 '.S._4~ 29 W
:3. 18
4. 18
:3.62
4.07
2. :=:6
45('D(). 20 38 :-3 60 6, W
4600. 21 6 S 60 57 W
470o, 21 6 ¢'._, 61 13 W
4:=:00. 20 .'.55 S 61 2:3 W
4'.:.)0c). :.30 58 S 62 2 W
~(')(')('l . 2("1 ._,_,~':' :--; 62 15 W
t":~. · . .
.... 100 .'.=_-'A :2:7 S /-.1 57 W
5200. 20 2:3 '.S 62:3~ W
5:300. 2£) 46 S /_-,3 0 W
5400. 20 54 S /_-,3 24 W
100. 44:=:4.97
10("). 4578.41
.1. OA. 4/=,71.70
100. 4765.05
100. 4858.43
100. 4951.80
100. 5045.28
100. 51:38.94
100. 5232.56
100. 5:326.
127.25 4415.97
162.69 4.509.41
198.54 4602.70
2:34.25 46'?~6.05
269.89 4789.43
:305.59 4882. :=:0
34..1.. 00 4976.28
375. ?5 50/=,'=.-*. 94
411.04 516:3.56
446.55 5257.02
73.42 S 106.:=:5 W
90.95 S 137.87 W
108.35 S 169.37 W
125.56 S 200.85 W
142.51 S 232.35 W
159.23 S 264.01 W
175. :=:5 C-; 2'.-}5.39 W
1'P2.14 'S 326.42 W
· :,A,c: 19 o :357 71 W
.~... - m . --, ·
224.2:3 :=; :38'?. 46 W
129 64 c. 55 :::¢'1 W
165. 16 S 56 35 W
201.08 S 57 24. W
2:3./-,.87 S 57 59 W
272.57 S 5:=: 29 W
308.31 S 58 54 W
343.77 S 59 14 W
· -., ,=, - .
._,7,_,.77 :~ 59:31 W
413.:=:8 S 5'P 48 W
449. :3'?~ S 60 4 W
a:-'- .
0.57
0.10
0. 18
0. '- )
0.08
0.37
0.3:3
0. :E:,=-/
0.20
· 5500. 20 53 :=; 6:3 4:3 W
560c). 20 45 S 6:3 57 W
5700. 'ZO 1:=: S 64 12 W
5:=:00. 20 45 ,.E; 64 21 W
.5':T¢OCD. 21 2 S /=,4 25 W
100. 5419.44
1 c)O. 5512. '? 1
1 ()0. 560/=, · 56
100. 5700.20
100. 5793.62
482.17 5350.44
517.6:3 5443.91
552.71 5537.56
587.76 5631.20
623.43 5724.62
240.10 :=; 421.3'P W
255.77 S 453.30 W
271· 10 c.._, 4:=:4 .84 W
286.:32 S 516.44 W
301.74 S 548.6:3 W
484. 'P'P :=; 6cED 20 W
520· 48 "--=; 60 34 W
555.4"F.~ S 60 47 W
590.50 S 61 0 W
626. 13 S 61 11 W
0.11
c). 16
0.4.5
0.45
0. '-"':'
ARC 0 A I...A:.=:I< A, I N C.
DS 14., WELL. NO: 36 SIGMA-'-GYRO
PRIJDHOI5 BAY., NORTI-~ '.=;L. OF'E., AL. AF.;I<A
,J 0 B N 0: A 0184 R 04. () 5-N Z
C 0 I'1F' U T A T I A N
T I ME [sATE
1:3: 54: 11 18-._1AN.-84
PAAE Nfl. :3
TRUE
MEASURED I"~RIF:T DRIFT C:OURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 .L=: U R E DOGLEG
DEF'TFJ ANGI_E DIRECTION LENGTH DFPTH SECI'ION TVD C 0 0 R D I Iq A T E '.B DISTANCI= DIRECTION SEVERIT',
F:EET D M D M F:EET FEET FEET FEET FEET FEET D M DG/100F"
6000. 21 23 L:: 64 4'7 W
6100. :2:1 3:=: S 65 5 W
62c)c). 22 6 S 65 23 W
6:300. 22 21 '.:J; 65 18 W
6400. 22 38 S 65 2'7 W
6500. 22:20 .S 65 23 W
/ ,- o.5
66 () A. 2. 2 1 S '-:,.:, ....... 14
6.. '70. 0 . 21. 4 :z: ,:....., 65. M.. :L W
6800. 21 17 8 66 19 W
/::,'?AO. 20
· _,.. S 66:2:2: W
100. 58:36.84
100. 5'279.90
1 c)('). 60'72.72
100. 6165.2'.-.TM
1()0. 6257.68
10C). 6 =:50.07
1 c)O. 6442.67
1. 00. 6535,47
i c)0. 6628.50
100. 6721.81
659.6c) 5817.84
696 '"'
. ..: 1 591 (). 90
7:3:3. :2:,'9 6003.72
771.21 6096.2':':'~
809, 48 6188,6:3
847.7'.:-: /:,281.07
885.47 6373.67
.v ~.:z,. 72 6466.47
95'.;). 38 655'...'.~.
'.-}'25.35 6652.81
317.26 S 5:31.:33 W
332.77 S .614.5c) W
348.:34 8 64:3.27 W
364. 12 S 682.66 W
380.06 S 71'7.45 W
..., .~.., ...... 7._,z. 24 W
41.1.64 :E; 786.59 W
426 'F,'6 '.:-; '--'""" 55
· ,"', .,::. ~,.). W
. ,:,._ 4.07 W
441 :=:1 ':'._, '-'.~
456.19 S :_::::.:7.04 W
662.27 S 61 23 W
698.82 S 61 34 W
735.93 S 61 45 W
773.70 'S 61 56 W
:::11.90 S 62 5 W
,-'..... 10 S 62 14 W
88'7.79 S 62 2:3 W
,=r:.,ZL ,',:", ':' 62 31 W
.. ,,. --..'],'.,:, ..,
961.58 $ 62 39 W
9'.:.~7.47 S 62 47 W
0.38
0.20
0.55
0.26
0.29
0.3 )
0.3:3
0.31
0.47
0.42
700(). 20 11 S 6'7 7 W
'7100. 19:33 S 67 24 W
7200. 18 54 S 67 59 W
73('~0. 1.8 19 ::i: 68 12 W
'740c). 17 42 S 69 36 W
1 c)O. 6815.46 1030.43 6746.4/_-.
100, 6.909.50 1064.42 6840.50
100. 70c)3.92 I c397. :36 6934.92
100. 7098.68 I 129.27 702'.~. 68
100. 71~3.78 116c). 16 7124.78
46?. 99 S 919.28 W 1032.46 $ 62 55 W 0.7:2
483.12 S .950.64 W 1066.36 S 6:3 4. W ' 0.63
495.63 ,S ~81.12, W 109'i.,'~. 2(') $ 63 12 W 0.68
507.53 S 1010.74 W 1131.01 8 63 20 W 0.60
518.66 S 1039.59 W 1161.79 S 63 29 W c).75
:3000, 15 11:3 79 14 W
:E:100. 15 19 S 81 13 W
:E:200. 14 54 S :}:2 44 W
:E:300. 15 2' S 84 25 W
8400. 15 3::: 8 86 9 W
100. 7289.30 1189.72 7220.30
100. 7385.25 1217.83 7316.25
100. 7481.60 1244.50 7412.60
100. 7578. 19 1. 27£). 18 7509. 19
100. 7674.82 1295.63 7605.82
10c). 7771.38 1321. 12 77c)2. :38
100. 7867.85 1:2:46.69 77'? 8.85
100. 79/:,4.3'.-.? 1371.83 78'25.3'.-.?
100. 8061.00 1396.53 7992.00
100. 8157.44 1421.57 8088.44
528.96 L=: 1067.34 W 1191.22 S 63 38 W
:.::A 5/-. '.:-; 10'.=.~:2:82 W 121'P '-"-' '..':: 6:3 47 W
- - . - ,. . . ~::,~:%
547.04 S 1119'.21 W 1245.75 S 63 57 W
554.40 S 1144.02 W 1271.27 S 64 9 W
~/-,o. 9';.'_ _. ~,c. 11 :,,:, . ';~."::. _ W 1'='9/-,_. _. 54.'S 64 .-..."-"-' W
566.42 S 1194.:33 W 1321.84 S 64 38 W
570.._. ¢',_.':' S 1 ...-.., 9.. c')...._-, :::.. W 1:347 . ~_'-.' 1 c.._. 6. 4 56. W
574.52 S 1246.1c) W 1:372.17 S 65 15 W
577.40 S 1271.78 W 13'F~/=..72 S 65:35 W
579.57 S 12.c.~::-:.14 W 1421.64 S 65 56 W
0.96
0.81
1.06
O. 48
0. ~
..
0.80
0.54
0.57
0.45
0.76
:i.:.':500. 16 21 ,.E; :E:::: -2:6, W
8600. 17 13 N 8'2 9 W
8700. l:E: ~::6 N 87 ~P2 W
:=:800, 19 :]3 N 84 1. 4- W
:::::,:.t A (-~ . 20 23 N ,_,'=":'._, :37 W
00. ::-:253.56 1447.33 8184.56
0c). 834.9. ':-':9 1473.88 828c). 29
00. 8444.44 1501.73 8375.44
00. 853'2.04 153c). 46 8470.04
00. ',E:633. I 2 1559. 94 8564. 12
5:::c') 83 c. 1F:2M 6:3 W 1447 34 8 /-,6 20 W
-- ~ m '--' -- -- ~ - --
580.96 S 1354.56 W 1473.89 S 66 47 W
580.08 S 1385.31 W 1501.86 S 67 17 W
577.75 S 1417.65 W 153o.86 8 67 50 W
574.17 S 1451.35 W 1560.80 S 68 25 W
0.9:E:
1. 07
1 .48
1. 24
1.18
~ ~ C 0 ~1_ ~'.iii; K ~, I H C.
) S 14, W E L.. L Iq Fi: 3 6 'F; 1' C.~ M A-. f"~ Y R f'l
:'RIJDH(:)E.. BAY, hlOF(I'H '.E;Lr)F'E~ AL. ASKA
,JOB NO: AO184RO405-NZ
COMPUTAT I ON
T I ME DATE
1 :'::: 54: 1 1 18-.,J A N- 84.
F'AGE NO.
TRUE
· 'IEASURED DRIFT DRIFT COURSE VERTICAL VERTIF:AL SUBSEA R E:' C T A N G U L A R C L 0 S LI R E: DOGLEG
DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TV.D C 0 0 R D I N A 'T E S DISTANCE DIRECTION SEVERITi
FEE]'' D I"1 B M FEET FEET FEET FEE]" FEE]" FEET D I',1 DG/100F'"
':.-.,'000. :21:37 N 8:;.:" 31 W
'i;:' 100. ':'.."2 1/_.., N c.,.-,,=,... 0 W
'?'200: 21 41 N 81 14 W
'.-..~ ::: (] C~ . 21 =;._ ...,':' N :=:_ 0 4 0 W
9400. 21 45 N 79 4'.';~ W
'FJ450. 21 55 N 7'P 1';:' W
100. 8726.47 1590.86 8657.47
100. 8819.22 1622.82 8750.22
10£;. 8:-.'¢ 1 I. ?.~5 1654.62 8842. '?~5
100. ".-.'~004. ::::0 1685. ?2 ,c':'.-}35.80
100. '~0'F¢7.64 1 '716. '.'.-¢'? '.:.~028.64
5('~. '.:.'¢ 144. (;5 17:32.41 :;¢075. (;5
56'.:).84 S ].486. '.:.>4 W 15'?¢2. :3?, S 6':-.¢ 2 W
=i'-'"' c:. 6'F' 40 W
· '::~/~,4 °2 c. 1..2.:, ~:'7 W 1/-'::.'~ 2.7
55'?¢.36 S 1561.01 W 1658.21 S 70 17 W
553.53 S 1577.67 W 16'70.84 S 7(; 53 W
547.20 S 16:]-:4. :30 W 1723.48 S 71 2'.-.-¢ W
543.80 'S 1652.5S~ W 1737.76 S 71 47 W
1.
0./_-,8
¢;. 64,
0.28
0. :3'8
0.5~.
:'RO,_IE)-:TED TO F'BTD
~:¢!'.5;I./~:,,, 21 5;!5 N '7'~ 12 W 66. '.:.)205. 27 1752.78 S¢136.27 53'F.J. 18 S 16.76.80 W 1761. :36 S 72 10 W 0.00
:' R O,J E C T E D T 0 T D
'7565. 21 5;5 N 7'.-T~ 12 M 4S]. 'F/250.73 1767.8S~ '~181.73 535.76 S 1694.77 W 1777.44 '.:-..: 72 27 W 0.00
F I hlAL C LO:":;LIRE - D I IRECT I 0 N:
D I STANCE:
S 72 DEGS 27 M INS 25 SEC::_-'; W
1777.44 FEET
ARCO ALASKA~ INC:.
DS 147 WELL NO: 36 .'E:IGMA-OiYRO ,JOB NO: AO184RO405-NZ
F'RUDHOE [~AY~ NORTH SL. OF'E, ALASKA
SIGMA-GYRO~ 0.-~)516 MD~ SLIRVEYOR: CORAM/JAHN., DATE RLIN: 10-,_1AN-84
'.SIGMA 17.5 NO' ~-- '-~ ' '"' 064
· :,6~, FRUBE NO:
F:'CIF~E[E;I[iHT: N 14 46 W
SURVEY TAKEN I::'RIZIM WELLHEAD
RECORD OF INTERPOLATED SURVEY
ARFO ALASKA, INC.
l.J.:, 14, WEI...L NO:. ._,'='/~_, ':'._, I nMA-GYRO_ _
PRUI]HF~E BAY, NORTH SLOPE, ALA.SI<A
,_lOB NO: A0184RCT405-.NZ
CCI M P U T A T I 0 N
T I ME DATE
?, : , 8-._1AN-84
1:3:._6 :'::7 I
PAGE NO.
1
..................... M A R K E R ................
......................... C 0 D E
.............. FLAME
TRUE SUBSEA
MEASURED VERTICAL MD-TVD VERTICAL R E C T A N G U L A R C L 0 S U R E VERTICAL
DEPTH DEPTH DIFF DEPTH C 0 0 R D I N A T E S DISTANCE DIRECTION THICKNESS
FEET FEE:]' FEE]' FEET FEET FEE'[' D M
TOF' SAG RIVER
TOF' t=:I.-IUBL I K
TOP SA['~I_EROC:I.-JIT
I."ICF'['
'I'OP ZONF :=: / ()WC
T Cf P Z 0 N E~..'"'
9056.00 8778.41 277,6 870'.-=~. 41
9077.00 8'7'.TJ'F.~. 74 279.3 8730.74
9158.00 887:3.00 285.0 8804 .. 00
"" '""""=: (]T(:)'- '""""
:~..:, ..:._,. ~ 0 ..: ,:, 01 297 () '::':) =;':~ 01
· . 1~ i, i. ,.' ._ ...
.-.~ .:, ::, .,:., 0 0 '.::) ('~ '.:.) 0 ..... 21 :3 <"} 1 '-':, ':i'~ (:~ ...'.'- 1 · .. 1
.-. 46....,. 00 91 .=_;7.96 307. CT .-.-..,,:,,-_,, "/
567.03 S 1507.68 W
565·:_::7 S 1516.20 W
..... '~,"'= 4.6 W
· ":;/-. 1 6 5 S 1 .. ,,.:..
551.95 S 1606.83 W
547.71 S 163'1.37 W
~o 7.5 c. 1/-.58 (')':-.> W
· ...--" mm -.~ . -- # # .
1610.78 S 69 23 W
1618.35 S 69 32 W
1644.35 S 70 2 W
16~8.~ S 71 3 W
1720.86 S 71 26 W
1744 66 c. 71 .':",':' W
· ._. ...._1
Suggest~ form to be inserted in each "Active" well folder to d]eck
for timely ccxnpliance wJ.~ our rc<julations.
· '" ~perator,' W~I 1 N~un~ and Number
Reports and Materials to be received by: ~--~ ~-~
Date
Required Date Received Remarks
· ,
_
· Ccmpletion Report Yes ~ _ ~ ~. _. ,.~.~..._ ,. /,..? :~. --.
'.
· ~_Well History yes d~",~_3-~'~'_ i,D.. ~/"~':, .... -
·
..
--
Core Chips .... ,/~ 4
- ,
Core
Description ....... ., ...
Registered Survey Plat
·
Inclination Survey ,f /.:.: ..... ' - x
Directional Survey
Drill Stem Test Reports , .." .:,
_
Proddctidn Test Reports
Logs Run. Yes .
·
....Digitized Data
? ~-~, STATE Or: ALASKA ~
.... ALASKA ,L AND GAS CONSERVATION C~..,IMISSlON
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drill,lng wellx[~ Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 83-163
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 029-21039
4. Location of Well 9. Unit or Lease Name
FNL, 1055' FEL, Sec. 9, TION, R14E, UM Prudhoe Bay Unit
at surface 2 0 83 '
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
RKB 73' ADL 28312
10. Well No.
14-36
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
For the Month of. January ,1984
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well (~ 0100 hfs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran, cmted & tested
13-3/8" csg. Drld 12-1/4" hole to 9081'. Ran, crated & tested 9-5/8" csg. Drld 8-1/2"
hole to 9565'. Arctic packed 9-5/8" x 13-3/8" annulus. OH logs. Ran, cmted & tested 7"
lnr. Ran CBL. Ran 5-1/2" comp. assy. Secured well & RR ~ 2000 hfs, 01/06/84.
SEE DRILLING HISTORY
13. Casing or liner run and quantities of cement, results of pressure tests
20", 91.5#/ft, H-40 weld conductor set (~ 80'. Cmtd w/375 sxs PF II.
13-3/8", 72.0#/ft, L-80 BTC csg w/FS ~ 2678'. Cmtd w/2000 sxs "Fondu" + 400 sxs PF "C";
9-5/8", 47.0#/ft, L-80 BTC csg w/FS @ 9066'. Cmtd w/500 sxs "G" cmt + 300 sxs CS I.
7", 29#/ft, L-80 BTC csg f/8751' - 9560'. Cmtd w/300 sxs "G" cmt.
SEE DRILLING HISTORY
14. Coring resume and brief description
NONE
15. Logs run and depth where run
DIL/BHCS/SP/GR f/9560'
LDT/CNL/Cal/GR f/9560'
CBL f/9516' - 8500'.
- 9050'.
- 9050'. GR to 2600'.
O. DST data, perforating data, shows of H25, miscellaneous data
NONE
17. I hereby certify that the for/e~7oing is true and correct to the best of my knowledge.
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in d6plicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10404 DRN/MR61
Submit in duplicate
DS 14-36
DRILLING HISTORY
NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2"
hole to 2708' Ran 69 jts 13-3/8" 72#/ft, w/FS @ 2678' Cmtd 13-3/8"csg
w/2000 sxs Fondu + 400 sxs PF "C". ND 20" h'~dril. Instld' 13-3/8" packoff &
tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500
psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new
form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to
9081'. Ran 226 jts 9-5/8" 47#, w/FS @ 9066'. Cmtd 9-5/8" csg w/500 sxs "G"
cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok.
Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 12.0 ppg. Drld
8-1/2" hole to 8565'(12/20/83). Ran DIL/BHCS/SP/GR f/9560' - 9050'.
LDT/CNL/Cal/GR f/9560' - 9050'. GR to 2600'. Arctic packed 9-5/8" x
13-3/8" annulus w/300 sxs CS I + 128 bbl A.P. Ran 20 jts 7" 29#/ft, f/8751'
- 9560'. Cmtd 7" lnr w/300 sxs "G" cmt. Drld cmt to 9516' PBTD. Displ
well to NaC1. Run CBL f/9516' - 8500'. Ran 5-1/2" completion assy w/tail @
8780' & pkr @ 8692' & SSSV @ 2097' Tstd hanger and packoffs to 5000 psi -
ok. ND BOPE. NU tree & tstd to 5~)00 psi - ok. Displaced well to diesel.
Dropped ball & set pkr. Secured well & released rig @ 2000 hrs, 01/06/84.
DRN/DH53' tw
ARCO Alaska, Inc.
Post Office B"--h~.60
Anchorage, A._.,ka 99510
Teiephone 907 277 5637
January 19, 1984
Reference: Arco Open Hole Finals
D.S. 14-36
12-31-83
12-3 [-83
12-31-83
12-31-83
12-31-83
WEL
BHCS
DILL
CDL
CDL/CNL
5" GO
Run 1 2" & 5"
Run 1 2" & 5"
Run 1 2" & 5"
Run 1 2" & 5"
se sign and return the attached copy as receipt of data.
Kelly McFar!and
ATO-1429F
Trans. # 023
D & M-
Dallas
Drilling
~Exxon
-Getty
Marathon
Mobil
DISTP~IBUTION
North Geology ~
R&D
Caroline Smith
ARCO A;ask~':. !nc. ~5 & S~;t'-cic:ar~ ol At:an~.icR~cr, iie:cC--'- z--'-''
ARCO Alaska, Inc.
Post Office r"'"-~ 360
Anchorage ..... ska 99510
Telephone 907 277 5637
January 19, 1984
Reference: ARCO Magnetic Tapes w/Listings
D.S. 2-10--~ 11-6-83 CN/MSN #1861 DA
-'~-~ :~ :/ ?-:7 ;.' --- /~- '-'- :.-../_i: . _
~- D ;S-W9ni~~12'J~"8~3 .... dN¢~'SN #1886 DA
GO
--D;~'~5;I2~"I';I2:84 --' CH CNL #228638
--~."S'7 2-6 ~ ..... ~-]~=84 ......... ~B'C~ #228635 w/LLs~8 ......... GO
D.S. 7'14 1-12-84 CH C~ ~,228636'w/i~s't'~ng GO
D,S, ~5-2 ~ ~-~-84 C~ C~ #228633 wll~s~8
~ ~ 5.~.:..A,L-~:~.,; :~ L~L-.~. ~ .L~: ......'...-' .' ...
~]} 2-1~;1-i1'84 ....... e~ C~ #228~3'4 ~/listing GO
~~~I'4-~-I~'I-2:1x83 TDT Edit #68838 W/listing
~D.S. 3-25~"~-.28,83 "-0~#68848 w}~s~8 - '
~ ~S::~w~~-12-1-83 TDT ~nswer #68839 w/listing
Run 1 Sch
Run 1 Sch
Run 1 Sch
D.S. 6-11~ .... -12-21-83 CH CNL #68871 w/listing Run 3 Sch
~.s. 4-11~- 12-5-83 c~/~s~ ~>18'8'i'"~-I~'L:~-~h"~' ...........
~~. ! q .-.:': - L" -: ':": .: :>-:' ' l:- :- :::, 7- · --' -,:' :-
Please sign and return the attached copy as receipt of~data.
Kelly McFarland
ATO-1429F
Trans. # 019
DISTRIBUTION
Chevro~
D&M
Dallas
Drilling
~xxon,U~
Getty
Marathon
Mobil
North Geology
Phillips
Prudhoe Bay
R & D
Sohio
ARCO A~aska !mr. 5 a S~_-.c:ar', ..~ ~'~:.~nticR;cbf,P-r_ . .
~,~ STATE OF ALASKA ,--
MONT LY REPORT OF DRILLING AND WORKOVER OPERATION
1. Drilling wellX~ Workover operation [~
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 83-163
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 029-21039
4. Location of Well 9. Unit or Lease Name
atsurface 2083' FNL, 1055' FEL, Sec. 9, T10N, R14E, UN Prudhoe Bay Unit
10. Well No.
14-36
11. Field and Pool
Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oi 1 Poe 1
RKB 73' ADL 28312
For the Month of December ,1983
.12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks ,
Spudded well ~ 0100 hrs, 12/20/83. Drld 17-1/2" hole to 2708'. Ran, crated & tested
13-3/8" csg, Drld 12-1/4" hole to 9081'. Ran, crated & tested 9-5/8" csg. Drld 8-1/2"
hole to 9565'. Arctic packed 9-5/8" x 13-3/8" annulus. OH logs, as of 12/31/83.
SEE DRILLING HISTORY
13. Casing or liner run and quantities of cement, results of pressure tests
20", 91.5#/ft, H-40 weld conductor set ~ 80'. Quantities of Poleset u~ed N/A yet.
13-3/8", 72.0#/ft, L-80 BTC csg w/FS @ 2678'. Cmtd w/2000 sxs "Fondu" + 400 sxs PF "C".
9-5/8", 47.0#/ft, L-80 BTC esg w/FS ~ 9066'. Cmtd w/500 sxs "G" cmt + 300 sxs CS I,
SEE DRILLING HISTORY
14. Coring resume and brief description
NONE
15. Logs run and depth where run
N/A
.
REC iV[D
16. DST data, perforating data, shows of H25, miscellaneous data
NONE
Ala~! Oil & Ga~ Cons.
SIGNED17' I hereby__~.L,certify~_ ' ~ ~/-~f-~v-~.that .... '~h~ foregoing/ is true and correct tOTiTLEthe best Area°f my knowledge.Dri l 1 i ng Engi neer DATE .] /,~
'' I !
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 DRN/MR54 Submit in duplicate
DS 14-36
DRILLING HISTORY
NU 20" hydril & diverter. Spudded well @ 0100 hrs, 12/20/83. Drld 17-1/2"
hole to 2708'. Ran 69 jts 13-3/8" 72#/ft, w/FS @ 2678'. Cmtd 13-3/8" csg
w/2000 sxs Fondu + 400 sxs PF "C". ND 20" hydril. Instld 13-3/8" packoff &
tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 1500
psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Frld FS & 10' new
form. Tstd form to 12.5 ppg EMW - held 10.8 ppg. Drld 12-1/4" hole to
9081'. Ran 226 jts 9-5/8" 47#, w/FS @ 9066'. Cmtd 9-5/8" csg t/500 sxs "G"
cmt. Tstd csg to 3000 psi - ok. Drld FC & cmt. Tstd csg to 3000 psi - ok.
Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - held 12.0 ppg. Drld
8-1/2" hole to 9565' (12/20/83). Arctic packed 9-5/8" x 13-3/8" annulus
w/300 sxs CS I + 128 bbl A.P. Ran DIL/BHCS/SP/GR as of 12/31/83.
DRN/DH48'tw
RECEIVED
'JAN I
Oil & Gas Con~ gulltl~i~c~jr,,,
<-
M E'MOR -,NDUM of
AI~&S~A OIL A~D GAS CONSERVATIOI~ CO~..,~ISSIOf.T
~...~t~
TO: C. ~. Ch n ~
Chai~an~~ /
THRU: Lonnie C. Smith ~
Co~issioner TELEPHONE NO:
Alaska
DATE: December 28, 1983
FILE NO: 2 I. 7
Petroleum Inspector
SUBJECT: Witness BOPE Test on
ARCO Alaska, Inc. ,
Well ~o. 14-36, PBU,
Sec. 9, TllN,R14E,~f,
Permit ~?o.'83-!63.
!'7ednesdav, December 21, 1983: I left Conoco's Milne Point M-l,
Subj'e'ct ~f JhO'ther r~POrt, to ARCO's Well ~]o. 14-36 P.B.U. to
witness a BOPE test.
I witnessed the BOPE test on ARCO's l~Te!! ~o. 14-36. There were no
failures.
I filled out an A.O.G.C.C. report which is attached.
In s~mary, I ~itnessed the BOPE test on Parker Rig 176, for ARCO
on Well No. 14-36. I*~en the BOPE tests were completed they were
satisfactorily performed.
Attachment
%&G? #4
4/80
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Inspector
Well
Location: Sec
Drilling Contractor /3~/~/fL~C/~. Rig # /?~
Representative ~7{'~/C~,~L,-j-f ~,- /3/c/7'A,-_-/~.~'C3/j'
Permit ~ ~ --/~
t~asing Set ~ ~67~' ft.
Representativ~ ~~ /~~/~-~
Location, General
Well Sign.
General Housekeeping .
Reserve pit ~/~
Rig ~/~
BOPE Stack
Annular Preventer
Pipe Rams
Blind Rams
Choke Line Valves
H.C.R. Valve
Kill Line Valves
Check Valve
Test Pres sure
ACCUMULATOR SYSTEM
Full Charge Pressure ~ ~&3 ~P psig
Pressure After Closure /:f-~ psig
200 psig Above Precharge Attained: ~-
Full Charge Pressure Attained: ~
Controls: Master ~/~
Remote d~/~ Blinds .switch cover¢~/~
Kelly and Floor Safety Valves
Upper Kelly.
Lower Kelly
Bal 1 Type
Inside BOP
Choke Manifold
No. Valves ~ _~-
·
NO. flanges. ~ ~
¸~
Test Pressure
Test Pressure,.,
Test Pressure
Test Pres sure
Test Pressure_3~
Adjustable Chokes ~A~C
Hydrauically operated choke
Test Results: Failures ~/~/~c Test Time ~ hrs.
min ,~d~ sec.
min 3 ~ sec.
Repair or Replacement of failed equipment to be made within
Inspector/Commission office notified.
Remarks:
/
------ days and
. Distribution
orig. - A0&GCC
cc - Operator
cc - Supervisor
inspector
~ovember 9, 1983
Mr. D. S. Smiley
Area Drilling Engineer
AR~CO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510
Re: Prudhoe Bay Unit DS 14-36
ARCO Alaska, Inc.
Permit No, 83-163
SUr. Loc. 2083'F~, 1055'FEL, Sec. 9, T10N, R14E, U~.
Btmhole Loc. 2444'FSL, 2491'FWL, Sec. 9, T10N, R14E.
Dear ~. Major
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is conducted, a one' cubic inch chip from each foot of
recovered core is required. Samples of well cuttings and a mud
log are not required. A continuous directional survey is
required as per 20 AAC 25.050(b)(5). If available, a tape
containing the digitized log information shall be submitted on
all logs for copying except experimental logs, velocity ~urveys
and dipmeter surveys~
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 16.05,870 and the regulations promulgated thereunder
(Title 5, Alaska Administrative Code). Prior to commencing
operations you may be contacted by the Habitat Coordinator's
Office, Department of Fish and Game.
Pollution of any ~aters of the State ia prohibited by AS 46,
C~apter ~ Article 7 and the regulations promulKated thereunder
(~ttl~ lu Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
c~_encing operations you may be contacted by'a representative
of the Department of Enviro~ental Conservation.
To aid us in scheduling field work, please notify this office
24 hours prior to commencing installation of the blowout
Mark A. Major
Prudhoe Bay Unit DS 14-36
-2-
November 9, 1983
prevention equipment so that a representative of the Co~ission
may be present to witness testing of the equipment before the
surface casing shoe is drilled. ~ere a diverter symtem is
required, please also notify this office 24 hours prior to
c~m~ncing equipment tn~tal!ation ~o that the Commission may
witness testing before drilling below the shoe of the conductor
pipe.
in the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witnes~ present.
Very truly .yo_ur~,
.
C. V. Chatterton ~ Q~D~ O~2 .~'~ GQ~]~.~S~C~N
Chai~an of
Alas~aO~. and qa~ Conservation Commission
be~6~H/A
Enclosure
cc: Department of Fish & Gm-e, ~abitat Section w/o encl.
Department of Environmental Conservation w/o encl.
ARCO Alaska, Inc.
Post Office B~., 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
November 4, 1983
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT' DS 14-36, Permit to Drill
Dear Mr. Chatterton'
Enclosed is our application for Permit to Drill DS 14-36 and the
required $100 filing fee. Attachments to the application include
a plat detailing the section and plan views of the proposed
wellbore; a proximity plat; a sketch and description of the BOP
equipment; and a sketch and description of the surface hole
diverter system.
Since we anticipate spudding this well on November 17, 1983, your
earliest~ approval will be appreciated. If you have any
questions, please call me at 263-4610.
Sincerely,
D. S. Smile~~
Area Drilling Engineer
DSS/JG4L84-tw
Enclosures
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA IjiL AND GAS CONSERVATION CO,,,MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
2. Name of operator
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL []
DEVELOPMENT GAS []
ARCO Alaska, Inc.
3. Address
SERVICE [~X STRATIGRAPHIC I--I
SINGLE ZON E,~X
..,.~ ~ '~ ,
~. Umt or lease name ~ .~ ".~
Prudhoe Bay Unit ~ '~,
10. Well number ~.
14-36
11. Field and pool
P. O. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
2083' FNL,1055' FEL, Sec. 9, T10N, R14E, UH(Approximate)
At top of proposed producing interval
2496' FSL, 2611' FWL, Sec. 9~ T10N~ R14E, UN
At total depth
2444' FSL, 2491' FWL, Sec. 9, TION, R14E, UM
5. Elevation in feet (indicate KB, DF etc.) ] 6. Lease designation and serial no.
73' RKB I ADL 28312
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewide Surety and/or number #8088-26-27
Prudhoe Bay Field
Prudhoe Bay Oil Pool
Amount $500,000
13. Distance and direction from nearest town
5 mi, NE of Deadhorse
16. Proposed depth (MD & TVD)
9581 'MD, 9231'TVD
19. If deviated (see 20 AAC 25.050)
KICK OFF POINT 4000 feet.
21
14. Distance to nearest property or lease line
15. Distance to nearest drilling or completed
well feet
18. Approximate spuc cate
11/17/83
m il es feet
246!' ~ TD fr/^DL 283!~.
17. Number of acres in lease
feet 2560
20. Anticipated pressures
MAXIMUM HOLE ANGLE 22 ° I (see 20 AAC 25.035 (c) (2)
I
3387 psig@____ Surface
4140 _psig@ 97~1 ft. TD (TVD)
Proposed Casing, Liner and Cementing Program
SIZE
Hole I Casing
~0" 20"
il 7-1/2" 13-3/8"
2-1/4" ] 9-5/8"
/
8-1/2"! 7"
Weight
91.5#
72#
47#
29#
22. Describe proposed program:
CASING AND LINER
Grade Coupling
H-40 Welded
L-80 BTC
L-80 I BTC
Length
SETTING DEPTH
MD TOP TVD
80' 30' I 30'
2670' 30' I 30'
I
9082' 29'
I 29'
770'
8811 ' 18515,
D BOTTOM TV D
110'1 110'
2700' I 2700'
9111'I 8795'
I
9581'! 9231'
I
QUANTITY OF CEMENT
(include stage data)
375 sx Permafrost II
2300 sx Fondu+4OOsx PF
500 sx G 1st stage
300 sx PF 1, 2nd stage
400 sx Class "G" cement
ARCO Alaska, Inc., proposes to directionally drill this well to 9581'MD (9231'TVD) to inject into the
Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8", 5000 psi, RSRRA BOP stack will be
installed. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will
be pressure tested each week and operationally tested each trip. A string of 5-1/2", 17#, L-80 tubing, packer,
and necessary provisions for subsurface safety equipment will be run. A non-freezing fluid will be left in all
uncemented annuli within the permafrost interval. The packer will be set above the Sadlerochit. A separate
Sundry Notice will be submitted when the well is to be perforated. A surface diverter will be used on this
well. DS 14-36 will be 25' away from DS 14-8 at a depth of 3230' TVD and 129' away from DS 14-11 at a depth of
6075' TVD. There are no other wellbores anywhere down hole within 200' of the proposed DS 14-36 well course. DS
14-36 will be guided to the Southwest at approximately 1300' TVD and then monitored to try and maintain a
minimum distance of 100' from the DS 14-8 wellbore prior to kickoff.
23. I hereby certify that the foregoing is true and correct to the best of my knowledge
SIGNED ~.~. TITLEArea Drilling Engineer
CONDITIONS OF APPROVAL
DATE
Samples required Mud Icg required
[]YES [~O []YES ,~10
APPROVED BY~
Form 10-401 X~l~4/PD22
.
Directional Survey required J APl number
[~YES i--]NO J 50- C~"~ -
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE November 9, 1983
by order of the Commission
Submit in triplicate
LD
1200
2{00
3600
4800
6OOO
7200
8~.00
i 200 2400 3600 4800 6000 7200
~ i .... ~ ......... L , J .[ i ' i ..... i ..... i , i , , , , , , , , !
20 CASING TVi~ = I'JO i j
i
.
t3-3/8' CASINGTVD=2700
(OP TVD - 4O0g
, 12.5
~ 17.5
~(TO TAflQBe ET)
AVERAGE AN~LE
~ 21 DE~ 1 MIN
. 111
._
' LCU TVD=8~23 TMD-8282 3EP =1415
,
- 9-518' C;~SING TVD -- 87~ 5 TMD -- 9111 Oi P -- 1719
SAG RIVE~ TVD -- 8805 TMD -- e122 'DEP - 1723
SHUBLIK TVD -- 8827 TMD -- 9146 DEP -- 13 32
TARGET TVD =aaTS TMD =g19E DEP =1~50
TOP SADLEROCHIT TVD ~8898 TMD =g2~2 DEP =1760
I O/W CONTACT TVD = 9092 TMD = ~431 IDEP = 1B35
~-. ~ - ~ COOROINBTES
-5000 -4000 ~5000 -2000 -1000 O 1000 2000
~':':':':':':': =========================== ~¢:i:}:i: ~::::::::: :::::::::
i-;.i-;.;.;.i 'iDiSii' . ......... :
;:;:;:;:;:;:; -:-:-:-:-:-:-:-:-:-':::::::: ......... . ::::::::: -i.i.i.i.i.i.i.i.
-:-:-:-:-. .............................. -:-:-:-:-:-:-:-:-
':':':':':':': ' TARGET ....................................
............. TVD=8873 ' ........ .i ....................................
.:-:.:-:-:.:.' MD~ 9~ 95 ' ................................... · ..............
I o,,,..,, ,o..,..,. .,,.,o,,. .,,,...,,,
BEP*[750' ............................................
~ ....... SOUTH 697~ ................................... !:.:.:.:.:.:.:.:.:
-i-i-i-i-i-i-i WEST 1605' ::: ::::: :::::::7: ::::::::: :::::::':: ii-' .......
................ ' ................................. :'2'~-~'~'~'r-2-r~ ' ' 'o~ -:-~-:-~-~-r-r-2
.:.:.:.:.:.:.: ::::::::: ::::::::: :::;::::: 1055' ........ .
, ...... ,.,',,., ........ o..
':'~':-:-:';': .................. - .............
:::::;:::::::; .................. ~.~.~.~.~ ....
-!-i-!-i-!-!-! :-:-:-:-:-:-~-:-:-:-:-:-:-:-:-:-:-:-:- ' .... ~' .......
o'. ..... '' '.'...... .... ...... ~V~V ,.
:!:!:!:!:!:i:~ :-:-:.:-:-:-:-:-:. :-~-i-i~.i.i-i.i. . .... ::::: ...... 'i';'i'i'~';'i'
'.;.;.;.;.;.~ ........... .;.;.;.;.;.;.;.;. ' ..............................
......................... ' .......... '' ":":':':':':' ' ................
......................... '~'~'~'~'~ ':-t'~':'. .....................
....... ~'~'~':'2'~'~'~'~' , '~'~'t'~'~':'~' '~'~'~':'~ ~'~'~'~'~'~'~'~'. ..................
· ':':':':':': ......... 2500' ..... -i :-:-:-:-:-:-:-:-:- ' .........
.... ' .............. :i:i:i SHL: 2083;FNL, 1055' FEL, Sec
......... ~ ......... I ......... I~: ........
~-.-.-:-~-~-~ ~-~-~-~-~-~-~-~-~ ......... , . . - ..... .
....... ' .................. '~ .... THL' 2500'FSL, 2620'FWL, Sec 9
T10N, R14E,
.:.:.:.:.:.:.:.~.:..:.:.:.:.:.:.:.:.:. .............................. :i:!:i:!:!:!:!:!:;
-!-i-i-i-i-i-i-i-i-,-i-i-!-i.i-i-i-i-i-!-i-i-i-i-i-i-i-!-i--' ................. :::::::::'
.;.!.:.:.:.:.:.:.:.:.:.L.:.;.:.:.:.;.;.;.;..;.;.:.;.:.;.;.:.:.I.;.:.;.;.;.:.:.; .... ;.;.;.;.;.~:~:.~.;.~;.;i:;.::;;.;.;.;.:.
i,,~,,,, · : ''' ;' ' ;''l' ;;';'; ;; ; ' ; ; ;; ;; ;; ;; ;;~;;;;ii:'''; ;
, | I , , . , , ' ' I ' ' ' ' ' ' ' ' ' ' ' ' ' i ' ' I ' ; ' ' '
-5000 -~O00 -3000 -2000 -i.000 0 ::'! ':'~-~;~' :"1000~'' ~;:":~':;~;"~ ;~000
E - N CooRn*~'~TFq~,~,,,, _~ ......... '
-5000
E - IA COOROINFITE
-'~000 -3000 -2000 - 1000 0 1000
2000
W
0 ·
Z
[ Iil]llJ ! IiIiiiiii tllllllll Illllllll lilllliiJ IIIIIIIII .lllllllJ
''~'~';'~";'~'~ ;':'";'~'~':':';':';';' ';'~':'"~'~'~'":"'i':'~'": ................... ;"'; ........................ ]; ........... ; .....
............................................. ~ ....... : .......... ~...~.;.;.;.,.~.;.;.~...~...;.;..:.~.~.;.~.;.;.;.;. ..;.;.~.~.~...~.~.
~:~:[:~:!:i:i:i [:~: :~:[:[: " ':.........................................................................
.........
''t':':'t':':':'":' ':-t-:'t-:-:':-:-:-':-:-:-:'t't-:-:-:--:':-:':':-:'t-t't' ':':':':-:':'t':'t'":':':':':-:'t':':-
' °~'~'~'~'~'~'~'"~'"~'~'~'~'~'~'~'~' '~'~'~'~'~'~'t'~';' '~';'~'~'~';'~'~'~' '~'~'~'~'~'~'~'~'~'"~'~'~'~'~'~'~';'~' ~';';'~'~'~'~'~'~'
';';';';';';';'";' ';'~';'~'~';'~°;'t' ';'~';';'~';'t';'t' ';';'~';'~';'~'~'~'i'~';'~-t'~-;';-;';-";-;-~-~';-~-t';-;- ;-;-;-~-~-;-~-~-;-
i~'~'~ .........................................................
============================================================= :!:i:!:i:!:i:!:i:!: :!:i:i:!:i:i:!:!:i:iZi:!:!:!:i:i:!;!Z!:
, . ...............
-,-''''''',,-' .:.:.:-:.:.:.:.:.:.:.:.:-:-:.:.:-:.:.:.l.:.:.:.:.:.:.:.:.:. ',,,,,,. --------- ---------~ ........ :::::':::
'::i:i:i:i:[:i:i ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :[:r:[:r:[:[:~:~:i: :::::::::::::::::::::
'":°;";':'t';°:' -;-i ......................................................
-.oi.i-ioi.i-i-i '- ......... "i:i:i:i:i:;:!:i:i:::i:i:i:i:i:i:i:i:i:;:i:ii:¢~_~,::~gei'i'~'i'!'
";';'Y'Y'Y';'Y ......... i-i-i.i-~.i-i.!-i..-i.i.i-i-i-i-i-i.i..-i-i-~-,-~-Z-L, ~;~[:i:5:[::
- . ........ . ........ ~.-.~.-S~ ~0~ , , ................ ~ ........... 5,, ,-..-..
-~-i-i-~-i-i-~! ,-~--i-i-i-~ :-~,~S~-~-i-i-~-i-i-,-~-i-~-i-~-i-~-i-~--i-~.~.~-~-~.' -= 3~i.~.i.i.i-i- i-~.'.~253!.
:5:[:5:[:[:i:5~ :[: :5:i:[:[:i:5:[:i:5: ::[:r:[:~:[:!:i:z:!: ::;:i:[:r:r:r:i:r:[: ::i:r:r:r:;:~:;:~:s: :~:r:r:~:r:r:z:~:~::
-,-::::::: .i..i.i.i°i-i.!.i.i.i...i.i.i.!.i.!.i.i.!...i.i.i.i.i.i.i.!.i.~.!.!.!.!.i.i.i.!.!...!.i.!.i.i.!.~.i.i.~!.!.!.!.!.!5.~..
:::i:i:i:i:i:i:i i:i: :i:i:i:i:i:!:!:i:!:::!:i:i:!:i:i:i.!:i.::!.i:i.i:!.i:~.i:i.::i.~:~.i:~.~:~:i:i.::i.i:i.i:i:!:i:~:i: i:i:i:i:i:i:i.'::'.~
.................. ~ ....... '..': .'t ,', .'r .'r ,' ,', .'..' .... ' .'J .'.. r ............
~.i.¢.i.~.i.i.i~..i...i.¢.i.~.i.i.i.i.i..!.i.!.i.i.¢.i.(.i..i.!.i.i.i.i.i.i.i..i.i.i.i.i.!.i.i.i..i.i.i.i.i.i.i.i.i- i-i-i-i-i-i-i-i-i-
~.:.:.:.:.:.:.:..:...:.:.:.:.:.:.:.:.:.I.:.:.:.:.:.:.:.:.:.~.:.:.:.:.:-:.:.:.:..:.:.:.:.:.:.:.:.:..:.:.:.:.:.:.:.:.:.
..:.:.:.:.:.:.:...:...:.~.!.~.!.;.!.[.?.[.;.;.:.;.;.!.7.!.;...:.:.:.:.:-:.:.:.:..~.[.!.:.!.:.!.;.;..:.:.:.:.:.:.:.:.:. '
..,.,.,.,.,.,.,,.,..,.,.,.,.,.,.,.,...,.,.....,.,...,....
.~.i.!.i.i.~.~.i~.i.'.i.i.i.!.i.i.i.i.i...i.i.i.!.~.i.i.i.i...i.i.i.i.i.i.i.i.i.~.i.i.i.i.i.i.i.i.i...i.i.i.i.i.i.i.i.iI._.... .........
:':i:i:[:i:i:[:i :i: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
-5000 -4:000 -3000 -2000 - lO00 0 "'; "',.1'0'00 ' 2000
E - N COORDINFtTES
,. , ., ; ;:
NCrrF~. WELL PATHS EXTEND BEYOND VIEWING WINDOW.
D S 14- - $6 - 1,',1 COl]RD I NFITF':S
- 1000 -900 -800 -700 -600 -500 -dO0 -300
I i i i i i I I I I i i I i i i i i i i i i i i I i, i i i i i i i I I I I I I I I I I I I I I I I I I i I i i i I i I I I I
~ ~399
5295
6
~,5843
· ~378
/706~~ 5761
~78~ ~s947 ~261
7008 ~
5285 ~ 6591
~' ': [~', Jtq~ .,.~.: '~.'~.'~f~f~.'., ~, ",
i i i I i i i i i i i i i i i i i i i i i i i i ~ i i i I i i i i i i i i i i i i i i ; i '1 i i-i i i i i i i i i i i i i i i i
i.-,.i I
z
- 1000 -900 -800 -700 -600 -500 ...... "- -~tO0 -300
g - N COORDINFITES
ANNULAR
PREVENTER
~DSILLIN6~~'~
13-5/8' BOP STACK OIAGRAM
Accumulator Caoacity .Test
1. Check and fill accumulator reservoir to proper
level with hydraulic fluid.
2. Assure that accumulator pressure is 3000 psi
with 1SO0 psi downstream of the regulator.
3. Observe time, then close all units simultane-
ously and record the time and pressure remaining
after all units are closed with charging p~mm~
off.
4. Record on IADC report, (The accemtable lower
limit is 45 seconds closing time and 1200
psi remaining pressure.
13-5/8' BOP Stack Test
1. Fill BOP stack and manifold with a non-freezing
liquid.
2. Check that all hold down screws are fully
rmtract~d. Mark running Joint with predeter-
mined plug seating depth. Run test plug on
drill pipe and seat in wellheaa, Run in lock
down sCreWs.
3. Close annular preventer and chokes and bypass
valves on manifold.
4. In each of the following tests, First hold
a 250 psi low pressure test for a minimum of
3~ minutes, then test at the high pressure.
5. Increase presure to 3000 psi and hold For
minim~m~ of 3 minutes. 8lead pressure to zero.
6. Open annular preventer and close top set of
pipe rams. Increase pressure to 5000 psi
and hold For at least 3 minutes. 8lead pres-
sure to zero.
7. ClJse valves directly upstream of chokes
open chokes. Increase pressure to ~000 psi
& hold for at least 3 minutes. Bleed pressure
to zero.
8, O;en top set of pipe rams then close bottom set
of pipe rams. Increase pressure to ~000 psi
below the bottom set of pipe rams and hold For
at least 3 minutes.
g. Test remaining untested manifold valves (if
any) with SO00 psi upstream of valve and zero
pressure downstream.
~0. Bleed pressure to zero. Open bottom set of pi;e
rams.
~1. Back off running joint and pull out of hole.
Close blind rams and test to 5000 psi For at
least 3 minutes.
~2. Bleea pressure off all equimnent. Open blind
rams. MaRe sure manifold and lines are full of
non-(r~ezin~ liquid and all valves are set in
drilling position.
~3. Test standDipe valves to ~000 psi.
1¢. Test Kelly cocks and inside BOP to 5000 ~si with
Koomey
~5. Chec~ o;eration of Degasser.
16. Record test information on blowout ~reventer
test form. Sign and send to Drilling Super-
visor.
17. Perform complete 8OPE test once a week and
functionally operate BOPE daily.
35 Rev. ''
~/13/8~ . . ~.:.: '~': ,
SURFACE
HOLE D ]'VERTER
ARCO 'ALASKA
SYSTEM
INC'.
SCHEMATIC
IO" HYD. OPR. BALL VALVE
~WELL BORE
./ /~-----IO" HYD. OPR. BALL VALVE
// // // I ALL 90* TURNS ARE "TEE"
] CUSHION
I
RESERVE
AREA
I
I
I
I
WELL
Q BORE
I I NOTE'
, I
I I
t I
I
' I
FLOWL INE
DRILLING
RISER
,
F
20" 2OOO PSI WP
ANNULAR PRE VENTOR
"'"' I
Valves on diverter
lines open automati-
cally when the annular
preventer is closed.
20"
CONDUCTOR
PIPE
/
I O" HYDRAULIC
OPERATED BALL VALVES
"DETAIL"
202601020:
ARCO Alaska, Inc. '
Post Office Bo^ 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
October 31, 1983
Mrs. Elaine Johnson
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT' Conductor As-Built Location
Dear Elaine'
Enclosed is
If you have
Sincerely,
J. Gruber
Associate Engineer
an as-built location plat for
any questions, please call me
JGRUS/L19'tw
Enclosure
Plat - DS 14 - Wells:36-37
the subject wells.
at 263-4944.
ARCO Alaska, inc. is a Subsidiary of AllanticRichfieldCompany
D.S. 14
EAST
PAD
4
9
,
VICINITY MAP
TION~,,~ R 14oE U.M.
I 4 O0 °~
ASBUILT LOCATIONS
WELL ~6 Y=59~8260.8~4
X = 6754;58.3:56
LAT · ?0~14'1 ~.10 6"
LON 4i= 148e:~5' 00.188'
N.W. ¢OR. CELLAR BOX ELEV. z42.3'
WELLI137 Y=B9;~BI44.061
PROTRACTE:D
RI4E,
SEC 9, TION,
X = 675465.921
LAT = 70*14'11.951
I;OH G · 148e34'5 9.'1~5
~N..W, COR. C£Lt. AR BOX EL~V.,41.9'
:~ fY8~'~'?~OORDS ASP ZONE ~
~.,~; -:,..; . ,
"~'~';~;~ 0,"/ · ,. '
' '"' '-~'&S' ~: ~.
/j ~-'/lf' , .
I HEREBY CERTIFY THAT I HAVE MADE A SUI:~'~E¥9'~i "~"J'",";;4,
OF T~ ABOVE DE~ED PROPERTY AND THAT
~E ~OVEMENT8 81TUATED THEREON ARE
WITHIN THE BOUNDerS OF SA~ TRACT ANO DO
~T O~ ~ ~OACH ON THE ~ERTY
LY~ A~ACENT T~~O, EXC~T A8 ~ICATED ~ SE~B~RT-' '
HEREON. MONUMENTATiON REPRESENTING NC.~;2-S ..'~ ~
BO~~ CON~~ BY PLAT tS ~WN ~ "~
~~ ~ ~ A~TE TO THE BEST ~ MY ~
~WLEGE
ARCO
D.S. 14 WELL 36-37. A$BUILT
I II I
0il and Gas Company
Dlvt~oa of Atlantic Richfield Company ..........
...... -.---.-,~.,---.- . -,.-,..,.,,,,-,- ,-, ,,,
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No. . ,ii.!~'"
ITEM APPROVE DATE
(1) Fee
(2) Loc
(3) Adrnin [,/L,.j..,%,. .........
thru 11)
(4) Casg ~~-~/~]/~
(12 thru 20)
(21 thru 24)
YES NO
1 Is the permit fee attached
2. Is well to be located in a defined pool ............................
3. Is well located proper distance from property line................~.__. .~.,,.~
4. Is well located proper distance from other wells
5. Is sufficient undedicated acreage available in this pool ............
6. Is well to be deviated and is well bore plat included ............
· · · ,'
7 Is operator the only affected party ......... ;;it ~]~]]]]] ]]]]~]]]
(.'"' "~,
9. Does operator have a bond in force .................................. "~
10. Is a conservation order needed ......................................
11. Is administrative approval needed ....................................... '
13. Is enough cement used to circulate on conductor and surface ...... ~. ,.,
14. Will cement tie in surface and intermediate or production strings
15. Will cement cover all known productive .horizons ...................
16. Will surface casing protect fresh water zones .................... ;1
17. Will all casing give adequate safety in collapse, tension and burs
18. Is this well to be kicked off from an existing wellbore ............. ~
·
19. Is old wellbore abandonment procedure included on 10-403 ............
20. Is adequate well bore separation proposed ........................... ~ "
, ,,
·
21.
22.
23.
24.
25.
REMARKS
Is a diverter system required . ·
Are necessary diagrams of diver;;;';;~'~;;';;gl;~;;;';;;;g~;~ ~~ "
Does BOPE have sufficient pressure rating -Test to ~-~ psig'' .
Does the choke manifold comply w/API RP-53 (Feb.78) .................. /~ ~tfgJ~l
·
Additional requirements .............................................
·
Additional Remarks: ~J~2.2. /~/-~
Geology: Engi.n~er~i- ng:
',
WVA ..~ JKT ---HJH .~-/]
J AL~_(..,::. ~';-. ~_._,,_ MTM ~-
rev: 12/06/82
- INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effod has been made to chronologically
organize this category of information.
DIR'ECT
DIGITAL
LOGGING
C'OPiPUT E,R P~ROCES'S.ED A'N A,LYSIS
Company ARCO. ALASKA INC,
Wel 1 i)S ! 4-:36
Field PRUDHOE BAY
Count~ .... NORTH SLOPE
State ALASKA
...~_, ~._,J.~, ,~, .i ,,, , ~- -
CLIENT
F 0 R'M',AT
DATA
TAP'E
LOG
I HF 0 RM A"T"I ON
STANDARD
FO~RMAT < L, I',
$, )
No,: ARCO' ~4-J6
Depthz: 90~, 0,0 to 9570, O0
Name:; DS 14-3'6
Field: PRUDHOE,B~Y,
Date: 20 FEB, ai..l~84
Time: 2:43 PI'! I'ION,
L, I,
S i
TAPE RECORDS
REEL HEADER
***********************
Service name: &C=SF01
Previous reel:
HEADER RECORDS
Date: 84/02/20
Commente:
Origin: Real name:
123183
Page
Continuation #: 01
************************
TAPE HEADER
Service name: &GSF01
Previouz tape:
Date: 84/02/20
Commentz:
Origin:
Tape name:
123183
Continuation #: 01
mmmmmmmm,mmmmm
FILE HEADER
***********************
File name; &G5F01,001
Maximum l~ngth: 1024.
Service name:
HEADER RECORDS
Version #:
File type: LO
Previous ¢ile:
Date:
Page
HN£H
CH
WN
FN
COUN
STAT
CTRY
SECT
TOWN
RANG
EKB
EDF
EGL
PO
LMF
DNF
RUN
LOC
SON
LUN
FL
LUL
EHGI
WITN
DL
TLI
CS
TLAB
BHT
MRT
HT
MSS
NVlS
RM
RMF
MFST
MFSS
RMC
NeST
MCSS
I NFORMAT I ON RECORDS
CONTENTS
ARCOiALASKA IRC .... ' .............
O~ 14-~6 .,.,,,,,,,,,,~,.,
PRUDNOE BAY ...............
NORTH SLOPE .,...,,. ..... , ..... ,,' ................
ALASKA ,.. .... ' ......... ,..,,.'... ......... .,..
USA ....... ,,.,,,, ........ ,, ,,,, ,,, ....
9 1 I i i i # t i i i s I i i I: $ i i I i i I i i i: l i I i i i i i i I I i I I i i: i i: i i i t I i I i I I
1 ON I 1' , I , , ........ ; I I' I I I I ....... , , ...... , , I , i~,~I , ....... , I I
14£,..,,.,.,,,,,,.,,.,, ,,.,,,..,o..,,.,,,,,,.,,.,,,..,,,,,
69,000 ........ ,.,~,, ....... , ........... ..... ~,,:,,. .... ,,,,
~e. O00 ...............
39,000 ...............
KB .............. . ....
lllIIImIIIllIalmllI. II
NORTH SLOPE .
NORTH SLOPE ,
WAITE ,
LAUE ,
9565.000 .......... , .
9551,000 ......... .
9060,000 ............
9547,000 ......... .., ,
20.30,000 ............
1200,000 ............
190,000.., .........
190.000 .............
LIGN
FLOWLIHE
.38. 000 .......
1.400 ........
! ,600 ........
59,000 .......
MEAS ,
1,400 ........
61,000 .......
MEAS .
I
IIIISlI
IIllIII
IIIIlIl
IIIIIII
IISIISl
IIeII'lI
IlIIllI
IIIlIII
IIlIIIIIIlIliIIIIIII~III, IiIIIIIIII
IIlIIgIIiIIlIlIlllIlI'llilIIIIIIIl
IIl'IIIIIIIlIIIlIIIII~III'lIIlIIlIII
IlIlIIIIlItllIIIlIlItlllIlIIIllIt
IlllI'IItIIlIlIIIlIIIIIlIIIIIlIIII
IIlIIIIlIIIIIlIIIIII, IIlIIIIlIlIIl
IlIIIlIlIlIlIlIIlIlIIIlIIIlIIIllI
iIIII:IlllIIIIIIIIlII~IIi'II'IIilIilI
IIIII;lI, IlIIlIIiIlIIl:llIIllIIlIIIl
IIIIIII, IIIIIl. IIIIIIIIlIlIIIaIIIII
IIIIl'II, IIIIIIIIllIIIIllIIllIIIllI
IlIIIIl~IIIIIlIlItIII:IIIIllIiIIlII
IIIlIIIIIIIlIlIIIlII, IlIIlIIIlII'III
IliII~IIllIIIIIlIlIIIIIiIII'IIIIIII
IIIllIlIlIIIIIIIIIII. I, IlIIIlIIIIII
IIIlIIIIIIlIlIIIlllIIIIIIlIlIIIII
iIIlI:II. IlIIIIlIlIiIIlIIIIIIllllll
IIIIIItIIIIIIllIIIlIIIItlIIIIIIll
IlliIlillIliIlIIiIIIrIlIlIIiIIIlI
iiIilII. IIIiIiiIIiiiIrIIIIIIIIIIII
IIIiIilIilIlIlIiIIlIIlIIlIlIlIlII
IlIiIllIIIiIIIIllIIl. llIIIIIIIlill
IIliIIIIIiIIIllliiIiIlIIlIlIIIlII
IiIIiIiIlliilIIIIIIiiaIIIIIlIiIII
IIIIIllllIIIIIIIIlIl. IlIIllIiIIlII
iiIiIiIIllliiIIilIii'iiiIiiIiIliii
IIIiIIlIIliIlIIllIIIlIIIIIIlIlIII
iiiiiii:lIIIiiIIiliiIlIliIiIliIIlI
IIlIlIIiIIiiIIaIlIIII'IIlIIlIIIllI
IIiIiliIIlIIiiIIIlIliIIlIIlIIilII
UNIT
TYPE
'CAT~'
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
FT 0
FT 0
FT 0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
FT 0
FT 0
FT 0
FT 0
HR 0
HR 0 4
DEGF 0 1
DEGF 0 1
0 2
0 2
CP 0 2
OHMM 0 2
OHMM 0 2
DEGF 0 2
0 2
OHMH 0 2
DEGF 0 2
0 2
SIZE
CODE
40 65
40 65
40 65
20 65
20 65
20 65
2 65
3 65
4 68,
4 68
4 68
2 65
2 65
2 65
2 79
2 79
10 65
1 0 65
20 65
20 65
20 65
20 65
4 68
4 68
4 6~
4 68
4 68
4 68
4 68
20 65
20 65
4 68
4 68
4 68
4 68
12 65
4 68
4 68
12 65
.Pag~
COMMENT RECORDS
This LIS'tape was written by Gearhart Industrie$.Wireline
All curve and tool.mnemonics'used are those which most closely match
Gearhart'curve and',tool'mnemonics,
GEARHART TO SGHLUMBERGER
MNEM SERVICE UNIT MNEM SERVICE" UNIT
DEPTH FEET DEPT FT
TEN DIL/BC$ MY TENS DILBC$ MV
SP DIL/BC~ MV SP DILBC$ MV
GR DIL?BCS GAPI QR DILBGS ~API
ILD DIL/BCS OHMM ILD DILBGS OHMM
ILM DIL?BC$ ONMM ILM DILBGS OHNM
LL3 DIL?BCS ORMM LLSU DILBCS OHNM
DELT DIL/BGS US?F DT DILBCS U$/F
AMPS DIL?BCS NV AMPL DILBOS MY
GILD DIL/BOS MMHO GILD DILB~S MMHO
Pag~
DATA
ENTRY BLOCKS
ENTRY
ENTRY BLOCK LEGEHD'
TYPE DESCRIPTION
~m ~m~m~
0 Terminator ( no more entries )
FORMAT
SPECIFICATIONS
TYPE SIZE CODE
0 1 66
Page 6
DATA FORHAT
SPECIFICATIONS
· ** DATUH SPECIFICATION BLOCKS
SERVICE SERVICE API API API API FILE
ID ORDER # UNIT LOG TYPE CLASS MOD #
mmmm' mmmmm m~m mmmm
DEPT 123183
TENS DILBCS 123183
SP DILBCS 1231813
GE DILBCS 12318~
ILD DILBC$ 123183
ILH ~ILBC8 123183
LLSU DILBCS 123183
DT DILBCS 123183
AHPL DILBCS 123183
CILD DILBCS 123183
FT' 0 0 0 0 0
HV 0 0 0 0 0
HV 0 1 0 0 0
GAPI 0 31 0 0 0
OHMM 0 12 46 0 0
OHMH 0 12 44 0 0
OHMN 0 22 8 0 0
US/F 0 52 32 0 0
MV 0 53 3 0 0
HMNO 0 68 46 0 0
PRC #
SIZE LYL SMPL RC
mmmmm mmm ~mmm ~
4 0 1 68
4 0 I 68
4 0 1 68
4 0 1 68
4 0 ! 68
4 0 1 68
4 0 ! 68
4 0 1 68
4 0 1 68
4 0 1 68
PROCESS INDICATORS
mmmmmmm'mmmmmm~mmmm
000000 0"000'00 000000
000000 000000 000000
000000 ,000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 00.0000
000000 000000 000000
000000 000000 000000
000000 000000 000000
Page
DATA RECORDS
DEPT TENS SP" GR ILD ILM
AMPL CILD
9~63,~00 0,000 0,000 0,000 1,000 ~*********
0,000 100:0,000
9463,§00 390,0.00 20.600 21,900 2,'95J 3,467
108,000 3.38,844
9.363,500 346,000 50,8:00 78.600 7.'656 8,356
114,000 130.617
9263. 500 287,000 12.90'0 27.1 O0 24.660 21 .281
89,500 40,551
9163.500 351 . OOO 15. 700 29.700 . 726 1 .592
86.200 1377.210
906.3.500 268. Ooo 66. 700 70.900 2.951 14.2'23
70.700 338.044
Pag,s: 8
LLSU DT
1,000 0,000
5. 117 81 . 1 O0
11,803 78. O0'O
22. 182 84.600
!6. 032 1 00,800
12.853 80.00'0
FILE TRAILER
File name: ~G5F01.001
Maximum length; 1024
TRAILER RECORDS
Se'rvice',,nam¢:
Version'#:
File,type: LO
Next
FILE HEADER
~m~~~~~
File name: &GSF01,002
Maximum length: 1 024 I
HEADER RECORDS
File type~ LO
Version'#:
Pr~vi'ouz
Dat~:
Pag~
10
CN
WN
FN
COUN
STAT
CTRY
SECT
TOWN
RANG
EKB
EDF
EGL
PD
LPIF
DI'IF
RUN
LCC
SON
LUN
FL
LUL
ENGI
WITN
DD
DL
TLI
BLI
TCS
TLAB
BHT
MRT
lit
RMF
MFST
HCSS
coNTENTS
ARCO i ALASKA INC,
DS 14-36
PRUDHOE BAY
NORTH SLOPE ,.
ALASKA ,.
USA ,,
09 .......... ........,...
1ON ..... '. , , ,., , ... .....
14E... ............... ~...
69,000 ..... , .... , . , , , . ,
68.000.......... .......
39. 000 ................
'gL ................. ....
KB ...... · ........ ......
:30 ...........
............
7611&7612 ............
NORTH SLOPE ..
NORTH SLOPE ..
WAITE ,.
LAUE , .
9565. 000 .......... ~ ....
9551 , 000 ..............
9060,000 ..............
9547,.000.. ...... ......
2030,000 ........ . ......
1200,000 ........... ,,,
190,000. , .. ............
igo.ooo ...............
LIGN . ,
FLOWLINE . .
38. 000 ............. . .
1.400 .......... .....
1 ,600 ...............
59.000 ..............
MEA8 ........
1.400 ...............
61 ,000 ............. ,
MEAS ........
INFORMATION
fill'Il
mmllll
IIIlll
llllli
I11111
IIIIII
t11111
IIIIII
III111
IIIIII
IIII11
II!$11
IIIIII
IIIIII
IIIIII
II1'111
IIIIII
IIIIII
IIIII1
IIIIII
III1'11
IIIIII
IIIIii
IIIIII
IIIIII
IIIIII
IIIIII
II1111
Illlll
IIIIII
III1.11
IIIIII
Ill
111
lllllll~;'llrll
iIiI1111~IIi~1,
Iii11111~111~1
IIIIIl$ii'lill
llllllll'lilll
iiiiiiiiiiii
Iiiiiit11111
iiiiiiiiii1'1'
Iiiii1111111
iiiiiiiiiiii
IIIII1111111
t11t1111,1111
Illlllll'lllil
iiiiiiiiiii1'
Iiii111111tl
iiiiiiii1111
~11IIiIIII1:1
iiiiiiii1111
iiiiiiiiiiii
iiii1111'1111
Illllllll, llll
iiiiii111111
IIii111111111
iii!1111.1111
iiiiiiiiiiii
Iiiiiiiiiiii
iiiiiiiiiiii
Ilillllllllll
Iiiiiii1'1111
IIiit1111111
Iiii!1111111
illllllilllll
iIIilillllllll
i: i I I
I I II I
I I II I
I ! Ii i
I I IIl Il
I I iI I
IlII I Ii Il
I Il e I I
I Ii I I i
I i ii i
i i I! I
I I Ii m
I I Ii I
! II I
I II I I
I II Il I
I IiiI I
I II I l
i II i !
I i! ! I
· Ii i I
i II Il
i Ii i II
i II ii
I II II
ii II
RECORDS
UNIT
I I I I I I 1
I I I I I I I
I I I I I I I
I I I I I I I
i I i i i I l
,,,,,,, F'T
i e · I i i I
i · I I i i 1
i I I i i · I
I I I I I I I
I i I I I I I
i e i I i I I
....... ET
....... F'T
....... DEGF
....... DEaF
a i I I i i I
....... OHMH
.. ...... OHHII
....... DEGF
I I I I I I i
....... OHIIH
........ DEaF
i i ! · i i i
0 0 40
0 0 4O
0 0 40
0 0 20
0 0 20
0 0 20
0 13 2
0 0 3
0 0 3
0 3 4
8 3 4
0 3 4
0 3 2
0 3 2
13 3
0 0 2
0 0 2
0 O 10
0 0 10
0 0 20
O 0 20
0 0 20
0 0 20
0 3 4
0 3 4
0 3 4
0 3 4
0 2 4
0 4 4
0 1 4
0 1 4
0 2 20
0 2 20
0 2 4
0 2 4
0 2 4
0 2 4
0 2 12
0 2 4
0 2 4
0 2 12
CODE
65
65
65
65
65
65
65
65
65
60
68
65
65
65
79
79
65
65
65
65
65
65
60
60
60
60
65
65
60
65
60
65
11
COHHENT RECORDS
This LIS'tape was written by G~arhart Induzteie~,Wireline Service~,
All curve and tool.mnemonicz'us~d ar~ tho$~ which mo$% cloz¢ly match
G~aphart'curve and,'~,tool'mn~moni,c~,
GEARHART TO SCHLUMBERGER
MNEM SERVICE UNIT MNEM SERVICE, UNIT'
DEPTH FEET DEPT 'FT
CDL1 COMPUTED DPHI
CND01 CDL?CN$ ~ DOL NPHI FDCCHL PU
GR1 DIL?BCS GAPI GR DILBCS GAPI
~CAL1 CDL?CNS IN CALI FDCCNL IN
YCAL1 CDL?CNS IN CAL2 FDCCNL IN
CNSS1 CDL/CNS Z SAND NPHI FDCCNL PU
NCNS! CDL/CNS CPS NCNL FDCCNL CPS
FCDL1 CDL/CNS CPS FFDL FDCCNL CPS
NCDL1 CDL/CN$ CPS NFDC FDCCNL CPS
RHOB1 CDL?CNS G?C~ RHOB FDCCNL G?C3
DEN01 CDL/CNS G?C3 DRHO FDCCNL G?C3
CNSl CDL?CNS Z LIME NPHI FDCCHL PU
FCNS1 CDL?CNS CPS FCNL FDCCNL CPS
DATA FORMAT SPEC I F I CATIONS
*** ENTRY BLOCKS
ENTRY
TYPE DESCRIPTION
0 Terminator ( no:more entries )'
TYPE SIZE CODE
0 1 66
13
DATA FORMAT SPEC i F I CAT'I ONS
*** DATUH SPECIFICATION BLOCKS
*************************************
SERVICE SERVICE APl AP1 APl APl FILE
MNEM ID ORDER # UNIT LOG TYPE CLASS MOD #
DEPT 123183
DPHI
HPHI FDCCNL 123183
GR DILBC$'12318~
CAL2 FDCCNL 123183
NPHI FDCCNL 123193
NCNL FDCCNL 123183
FFDL FDCCNL J23183
NFDC FDCCNL 123183
RHOB FDCCNL 123183
DRHO FDC~NL 123183
NPHI ~DCCNL 123183
F~NL FDCCNL 123183
0
0
PU 4~
GAPI 0
iN 42
IN 42
PU 42
CPS 42
CPS 42
CPS 4~
G/C3 42
PU 42
CPS 42
0 0 0 0
0 0 0 1
68 I 0
31 0 0
28 0 0 1
0 0 0 1
68 3 0 1
0 0 0 1
0 0 0
0 0 0 1
35 1 0 1
39 0 0 1
$8 2 0 1
0 0 0 1
PRC #
SIZE. LYL SHPL RC
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 ~8
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 I 68
4 0 I 68
4 0 1 68
4 0 1 68
4 0 1 68
PROCESS:INDICATORS
000000 000000 000000
000000 O000,OO 000000
000000 000000 000000
000000 000000 0000'00
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
Page
14
DATA
Page
DEPT DP.HI NPHI GR CALI CAL2 NPHI NCHL
'FFDL NFDC RHOB DRHO NPHI FCNL
gS?O,O00 160,G06 -1,663 0,000 0,000 0,000 4,000 0,000
0.000 0,000 0,000 0,000 0,000 0,000
94;'0,000 lg, 758 16.600 29.400 8;750 8,930 23. 600 356.300
404.600 644. JO0 2.324 , 016 19,600 358. 000
'9370. 000 20. t21 I ?.330 25.200 8.'730 9.130 24,330 369.400
404,800 633.400 2,318 , 016 20.330 367,800
9270,000 19,515 1:8.441 25. 000 8; 7::30 9,120 25,440 348. 000
403. 200 627.800 2,328 . 011 21 ,440 340. 100
9170.000 26.545 15.t22 25.000 8,700 9.110 22.120 383.700
492,200 667.900 2.212 .013 18.120 407.200
'9070. 000 1 ?,.333 15.481 55.400 8,91 0 9.3'70 22.480 356.cj00
390. 500 637. 400 2.364 ,030 18,480 376. 500
FILE TRAILER
.~.~,~**~~***~.~
name: &GSF01.002
Maximum length: !024.
Seevice",name:
TRAILER RE'CORDS
File type: LO
Yersion'#:
N,e×t ¢ile:
Page
16
*'" EOF ***