Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout181-101MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, January 12, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Austin McLeod P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC 14-13 PRUDHOE BAY UNIT 14-13 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/12/2024 14-13 50-029-20624-00-00 181-101-0 W SPT 8337 1811010 2084 402 402 403 403 151 318 320 318 4YRTST P Austin McLeod 11/13/2023 MITIA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT 14-13 Inspection Date: Tubing OA Packer Depth 151 2316 2280 2273IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSAM231113193413 BBL Pumped:7.2 BBL Returned:5 Friday, January 12, 2024 Page 1 of 1           MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To: Jim Regg DATE: Tuesday, December 3, 2019 P.I. Supervisor SUBJECT: Mechanical Integrity Tests Rel Insp Num: BP Exploration (Alaaka) Inc. 14-13 FROM: Austin McLeod PRUDHOE BAY UNIT 14-13 Petroleum Inspector 14-13 Type Inj Src: Inspector TVD Reviewed By: Tubing P.I. Suprv, NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 14-13 API Well Number 50-029-20624-00-00 Inspector Name: Austin McLeod Permit Number: 181-101-0 Inspection Date: 11/30/2019 - Insp Num: mitSAM191 I3018t049 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 14-13 Type Inj W TVD 8337 Tubing 566 566 566' 566 ' PTD 181101U .,Type Test SPT Test psi- 2084 IA 652 2299 - 2282 - 2276 - BBL Pumped; 2.7 BBL Returned: ? 9 OA sz uz - s v Interval 4YRTST PIF P Notes: MIT -]A Tuesday, December 3, 2019 Page 1 of I h3v- [4-is PTh 16( ICAO Regg, James B (DOA) From: AK, OPS FF Well Ops Comp Rep <AKOPSFFWeIIOpsCompRep@bp.com> Sent: Tuesday, March 19, 2019 8:13 AM I To: Regg, James B (DOA) Cc: AK, OPS FF Well Ops Comp Rep Subject: RE: GPB DS -14 Temporary PWI LPP defeats Attachments: DS -14 LPP Defeat Notification 3-18-19.xlsx Mr. Regg This note is to inform you that all the PWI wells on DS14 are back to normal operating conditions. '� Regards, Lee Hulme From: AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com> Sent: Monday, March 18, 2019 5:54 PM To: Regg, James B (DOA) <jim.regg@alaska.gov> Cc: AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com> Subject: GPB DS -14 Temporary PWI LPP defeats Mr. Regg, Per AOGCC waiver dated 3/11/13, PBU Oil Pool Low Pressure Water Injectors, BPXA is providing notification that all PWI wells on Drill site 14 are currently operating with the SVS defeated with a well pressure of < 75 psi. This condition is expected to remain until the PWI pig launcher has been replaced some time into the night. It is expected that all the defeats will be lifted by commencement of our morning tour. I will advise when wells are returned to normal. Per the waiver, BPXA has tagged and logged the defeated components in our Defeated Safety Device data base and we will notify AOGCC once the SVS is returned to service. Please feel free to contact me with any questions that you may have. Thank you, Lee Hulme Well Ops Compliance Rep BP Exploration (Alaska) Inc. Office: (907) 659-5332 Cell: (907) 229-5795 Harmony — 7187 (Alternate: Vince Pokryfki) BPXA Low Pressure Water Injector SVS Defeat Report Date 3/18/2019 Submitted Lee Hulme Defeated: By: Well # Permit # Date WHIP (PSI) Returned to Service 14-13 1811010 3/18/19 14-21 2051070 3/18/19 14-25 1831020 3/18/19 14-27 1831700 3/18/19 14-35 1831420 3/18/19 14-36 1831630 3/18/19 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Re gg DATE: Thursday,November 19,2015 k .. P.I.Supervisor �� I((LI i� SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. 14-13 FROM: Chuck Scheve PRUDHOE BAY UNIT 14-13 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry Jae-- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT 14-13 API Well Number 50-029-20624-00-00 Inspector Name: Chuck Scheve Permit Number: 181-101-0 Inspection Date: 11/14/2015 Insp Num: mitCS151115072755 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 1443 - Type Inj W-TVD 8337 - Tubing 1450 - 1454- 1454- 1452 PTD 1811010 - Type Test SPT Test psi 2084 - IA 188 2307 - 2287 - 2277 - Interval 4YRTST P/F P ✓ OA 152 337 - 332 - 330 - Notes: Md-Adkel 73-0 f1-4* (0) week s Cc • SCANNED SEP 1 6 2016' Thursday,November 19,2015 Page 1 of 1 • • \n, ++4 + I ‘6.1) (/) \f' r , I+) 64- \- .x • - ° \ • • • • • • • • • • • • • tsg .1. • . • -• TREE= GRAY GEN 2 . SOI'NOTES: I-12S READINGS AVERAGE 125 WELLHEAD= GRAY14�13 ppm WHEN ON ML. WELL REQUIRES A SSSV B. ACTUATOR= AXSON WHEN ON MI. KB.ELEV= 71' BF.B-EV_._...- KOP= 3200' Max Angle= 44"@6600' tum MD= 10178 2196' H 5-1/2"CAM BA L-0 SSSV NIP,D=4.562' tu ). 1 Datum 7V D= 8800'SS 13-3/8"CSG,72#, L-80,D=12.347" H 2581' — ' 9556' —I 5-1/2'BAKER PBR ASSY Minimum ID = 3.813" @ 9642' 4-1/2" CAM DB-6 LAND NIPPLE 2 _ 9571' — 9-5/8"X 5-1/2"BAKER SAB PKR 5-1/2"TBG-PC, 174,L-80,.0232 bpi,D=4.892" — 9582' 9582' — 5-1/2"X 4-112"XO TOP OF 4-1/2"TBG-R — 9582' TOP OF 7'LNR — 9619' I I 9642' — 4-1/2"CAM D6-6 LAND NP,D=3.813" 9643' — 4-1/2"BAKER SHEAROUT SUB 4-1/2"TBG-PC, 12.64,N-80,.0152 bpf,D=3.958" 9643' / ` 964.4' — 4-1/2"WLEG . , 9645' — ELMO TT LOGGED 07/10/82 9-5/8"CSG,47#,L-80,D=8.681" — 9900' PERFORATION SUMAARY REF LOG:CH CN_.ON 11/23/81 ANGLE AT TOP PERE:28°@ 10037' Note:Refer to Production D8 for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 10037- 10066 0 05/27/89 3-3/8" 4 10080-10114 0 05/27/89 3-3/8" 4 10118- 10128 0 05/27/89 3-3/8" 4 10134-10164 0 05/27/89 10260' —INTER WELL 350-700 IflC RUG, 3-3/8" 4 10170-10188 0 05/27/89 ME@ 10264',(11/14/12) 3-3/8" 4 10204- 10214 0 05/27/89 3-3/8" 4 10224- 10242 0 05/27/89 3-3/8" 6 10340-10344 S 09/06/88 3-3/8" 4 10340-10374 C 01/16/99 3-3/8" 4 10476-10498 S 09/06/88 3-3/8" 4 10530-10546 S 09/06/88 3-3/8" 4 10581 - 10599 S 09/06/88 3-3/8" 4 10606-10630 S 09/06/88 7"LNR,294,L-80,.0371 bpf,D=6.184" — 10762' TD — 10765' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDH©E BAY LINT 11/19/81 ORIGINAL COMPLETION 11/15/12 TQ/JMD SET HEC BP(11/14/12) WELL: 14-13 02/15/01 SIS-MD FINAL FERMI No: 1811010 10/28/01 RN/TP CORRECTIONS AR No: 50-029-20624-00 12/18/03 BI-IC/TLH PERF CORRECTIONS SEC 9 T1ON R14E 2235.18 F8 183.04 FNL 02/14/11 MB/JM) ADDED SSSV SARI Y NOTE 01/16/12 TMNJAC ADDED H2S SAFETY NOTE BP Exploration(Alaska) RECEIVED STATE OF ALASKA AIL OIL AND GAS CONSERVATION COMMON DEC 18 2011 REPORT OF SUNDRY WELL OPERATIONS OGCC 1. Operations Abandon LJ Repair Well LJ Plug Perforations U Perforate U Other LI Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeII❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development Exploratory ❑ Y 181 -101 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ISI 6. API Number: e Anchorage, AK 99519 -6612 50- 029 - 20624 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028312 PBU 14 -13 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): -- To Be Submitted i PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 10765 feet Plugs measured 10260 feet true vertical 9405.28 feet Junk measured None feet Effective Depth measured 10260 feet Packer measured 9571 feet true vertical 8944.09 feet ti true vertical 8337.24 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 87 20" 94# H-40 30 - 117 30 - 117 1530 520 Surface 2552 13 -3/8" 72# L -80 29 - 2581 29 - 2580.92 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 1143 7" 29# L -80 9619 - 10762 8379.43 - 9402.51 8160 7020 Perforation depth Measured depth See Attachment feet True Vertical depth See Attachment feet SCANNED MAR 112013 Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) 5 -1/2" Baker SAB Packer 9571 8337.24 Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 16042 0 1077 Subsequent to operation: 0 0 10811 0 1253 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Explorator10 Development ❑ Service El Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ❑ Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG El GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Email Garry.Catr0n(C,BP.COmmt Printed Name Garry Catron Title PDC PE Signature a441e Phone 564 -4424 Date 12/18/2012 5# , X DEC 1 9 2012 /H261 Form 10 -404 Revised 10/2012 Submit Original Only Casing / Tubing Attachment ADL0028312 Casing Length Size MD TVD Burst Collapse CONDUCTOR 87 20" 94# H -40 30 - 117 30 - 117 1530 520 LINER 1143 7" 29# L -80 9619 - 10762 8379.43 - 9402.51 8160 7020 PRODUCTION 8810 9 -5/8" 47# L -80 27 - 8837 27 - 7697.65 6870 4760 PRODUCTION 1063 9 -5/8" 47# S00-95 8837 - 9900 7697.65 - 8625.86 8150 5080 SURFACE 2552 13 -3/8" 72# L -80 29 - 2581 29 - 2580.92 4930 2670 TUBING 9546 5 -1/2" 17# L -80 24 - 9570 24 - 8336.36 7740 6280 TUBING 74 4 -1/2" 12.6# N -80 9570 - 9644 8336.36 - 8401.37 8430 7500 • • 1 1 Daily Report of Well Operations ADL0028312 ** *WELL INJECTING ON ARRIVAL***(ELINE HEX PLUG) INITIAL T /I /O = INJECTING /100/450 LRS FREEZE PROTECT DOWN FLOW LINE. RIG UP ELINE EQUIPMENT AND PT. RIH HEAD /ERS /CCL /HEX PLUG OAL = 25.1' OAW = 400LBS MAX OD = 3.6" FN = 1.38" SET 350 -700 HEX PLUG ME SET DEPTH = 10264' CCL TO ME = 17' CCL STOP DEPTH = 10247' TOP OF PLUG = 10259.65' POOH AND RIG DOWN ELINE EQUIPMENT. CREW AND EQUIPMENT OFF SITE. WELL SHUT IN ON DEPARTURE. DSO NOTIFIED. FINAL T /I /O = 0/0/0 11/14/2012 ** *JOB COMPLETE * ** TfiEE= GRAY GEN2 • *EY NOTES: H2S READINGS AVERAGE 125 V4'i3LFfAD= GRAY 14 13 • ppm WHEN ON MI. WELL REQUIRES A SSSV ACTUATOR= � AXELSON WHEN ON MI. KB. ELEV = 71' BF. EIEV = - - - KOP= 3200' Mix Angle = 44° at 6E00 Datum WD = 10178' I 2196' H 5-1/2° CAM BAL -O SSSV NP, D = 4.562" 'DatumTVD= 8800' SS I 13- 318" CSG, 72#, L-80, D = 12.347' H 2581' I —All I J I 95566' I--I 5-1/2" BAKER PBR ASSY I 1 Minimum ID = 3.813 "@ 9642' 4 -1/2" CAM DB-6 LAND NIPPLE S3 I 9571' 1-1 9-5/8" X 5 -1/2" BAKER SAB PKR I 1 5-1/2" 1BG -PC, 17 #, L -80, .0232 bpf, D = 4.892" I-1 9582' ITOPOF 4-1/2" TBG-PC H 9582' I \ I 9582' IH 5-1/2" X 4-1/2- XO I ITOP OF 7' LNR H 9619' 9642' -{ 4-1/2" CAM DB-6 LAND NEp D= 3.813" I I 9643' H 4 -1/2" BAKER SHEAROUT SUB I I4 -1/2" TBGPC, 12.6#, t -80, .0152 bpf, D = 3.958' I I 9643' I / ♦ I 9644' H 4 -1/2" WLEG I 9-518° CSG, 47 #, L -80, D = 8.681" H 9900' I---Ai , I 9645' H ELM TT LOGGED 07/10/82 I PERFORATION SUMMARY REF LOG: CH CNL ON 11/23/81 A NGLE AT TOP PE RF: 28° @ 10037' I Note: Refer to Ftoduction DB for historical perf data SIZE SFF PITERVAL Opn/Sgz DATE 3-3/8" 4 10037 - 10066 0 05/27/89 I �-„.. 3-3/8" 4 10080 - 10114 0 05/27/89 3-3/8" 4 10118 - 10128 0 05/27/89 3-3/8" 4 10134 - 10164 0 05/27/89 I I 10260' I- INTER WELL 350 -700 HEX PLUG, `� 3-3/8" 4 10170- 10188 0 05/27/89 kE % 10264', (11/14/12) 3-3/8" 4 10204 - 10214 0 05/27/89 _" 3-3/8" 4 10224 - 10242 O 05/27/89 3-3/8" 6 10340 - 10344 S 09/06/88 I --� 3-3/8" 4 10340 -10374 C 01/16/99 3-3/8" 4 10476 - 10498 S 09/06/88 3-3/8" 4 10530 - 10546 S 09/06/88 3-3/8" 4 10581 - 10599 S 09/06/88 3-3/8" 4 10606 - 10630 S 09/06/88 I 7° LE( 29#, L -80, .0371 bpf, D = 6.184" H 10762' 1.•.•.1A,,, , TD H 10765' DATE REV BY COMVENTS DATE REV BY COMo6YTS PRUDHOE BAY UNIT 11119/81 ORIGINAL COMPLETION 11/15/12 TQ /JM) SET HEX BP (11/14/12) WELL: 14-13 02/15/01 SI5-ND FNAL PERMIT No: 9811010 10/28/01 RNRP CORRECTIONS API No: 50- 029 - 20624 -00 12/18/03 BHC/ 1LH PERF CORRECTIONS SEC 9 T1 ON R14E 2235.18 FH.183.04 FN. 02/14 /11 WB/JM) ADDED SSSV SAFETY NOTE 01/16/12 TM VJND ADDED H2S SAFETY NOTE BP Exploration (Alaska) • • dtanA SEAN PARNELL, GOVERNOR 03 Li ALASKA OIL AND GAS 333 W 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ross Huebel Petroleum Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 keMitiED MAY 22 ZO1Z Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-13 Sundry Number: 312-182 Dear Mr. Huebel: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, / Cathy 1 . Foerster Chair 7 DATED this ; day of May, 2012. Encl. i 54 A-1V RECEIVED t STATE OF ALASKA • • ALAI OIL AND GAS CONSERVATION COMMI N MAY 1 20 2 i ' s APPLICATION FOR SUNDRY APPROVALS �' s���i Z 20 AAC 25.280 AOGCC 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations 0 • Perforate❑ Pull Tubing ❑ Time Extension ❑ Operation Shutdown ❑ Re -enter Susp. Well ❑ Stimulate❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ✓t BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 181 -101 • 3. Address: P.O. Box 196612 Stratigraphic ❑ Service El • 6. API Number: Anchorage, AK 99519 -6612 50- 029 - 20624 -00 -00 • 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: • Spacing Exception Required? Yes ❑ No 151 PBU 14 -13 9. Property Designation (Lease Number): 10. Field / Pool(s): ADLO- 028312 • Prudhoe Bay Field / Prudhoe Bay Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10765 • 9405 , 10762 9403 NONE NONE Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" Conductor 28' 108' 28' 108' Surface 2554' 13 -3/8" 72# L -80 27' 2581' 27' 2581' 4930 2670 Production 9874' 9 -5/8" 47# L -80 26' 9900' 26' 8626' 8150 5080 Liner 1143' 7" 29# L -80 9619' 10762' 8379' 9403' 8160 7020 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): SEE ATTACHED - - 5 -1/2" 17# L -80 25 9582 - - 4 -1/2" 12.6# N -80 9582 9643 Packers and SSSV Type: 5 -1/2" Baker SAB PKR Packers and SSSV MD and TVD (ft): 9571 8337 12. Attachments: Description Summary of Proposal 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development ❑ Service IO • 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 5/29/2012 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG 0 • Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ross Huebel Printed Name Ross Hu bel Title PE Signature Phone Date Mk 564 -5779 5/15/2012 Prepared by Nita Summerhays 564 -4035 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3 1 211 1....., Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test p Location Clearance ❑ Other: Subsequent Form Required: /O -1 APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: 6— - 2,/- / Z "° BDMS MAC 2 2 2O12 5/l e/i z- s Z , - I z' `� �7/?/ '' U ,( .✓ Form 10 -403 Revised 1/2010 rL�.; 0RIGINAL Submit in Duplicate �j 14 -13 181 -101 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 14 -13 7/11/82 PER 10,134. 10,164. 8,831.74 8,858.38 14 -13 7/11/82 PER 10,170. 10,188. 8,863.72 8,879.73 14 -13 7/11/82 PER 10,204. 10,214. 8,893.98 8,902.91 14 -13 7/11/82 PER 10,224. 10,242. 8,911.84 8,927.95 14 -13 4/15/83 APF 10,080. 10,114. 8,783.93 8,814.02 14 -13 4/15/83 APF 10,118. 10,128. 8,817.56 8,826.42 14 -13 11/22/84 RPF 10,204. 10,214. 8,893.98 8,902.91 14 -13 11/22/84 RPF 10,170. 10,188. 8,863.72 8,879.73 14 -13 11/22/84 RPF 10,134. 10,164. 8,831.74 8,858.38 14 -13 11/22/84 APF 10,037. 10,066. 8,746.03 8,771.58 • 14 -13 11/22/84 RPF 10,080. 10,114. 8,783.93 8,814.02 14 -13 11/22/84 RPF 10,224. 10,242. 8,911.84 8,927.95 14 -13 11/22/84 RPF 10,118. 10,128. 8,817.56 8,826.42 14 -13 6/11/88 APF 10,606. 10,630. 9,258.22 9,280.36 14 -13 6/11/88 APF 10,581. 10,599. 9,235.23 9,251.78 14 -13 6/11/88 APF 10,530. 10,546. 9,188.52 9,203.14 14 -13 8/31/88 APF 10,340. 10,344. 9,016.22 9,019.83 14 -13 9/6/88 SQZ 10,037. 10,630. 8,746.03 9,280.36 14 -13 9/8/88 APF 10,476. 10,498. 9,139.35 9,159.35 14 -13 4/25/89 SQZ 10,037. 10,630. 8,746.03 9,280.36 14 -13 5/27/89 RPF 10,224. 10,242. 8,911.84 8,927.95 14 -13 5/27/89 RPF 10,204. 10,214. 8,893.98 8,902.91 14 -13 5/27/89 RPF 10,170. 10,188. 8,863.72 8,879.73 14 -13 5/27/89 RPF 10,080. 10,114. 8,783.93 8,814.02 14 -13 5/27/89 RPF 10,118. 10,128. 8,817.56 8,826.42 14 -13 5/27/89 RPF 10,037. 10,066. 8,746.03 8,771.58 • 14 -13 5/27/89 RPF 10,134. 10,164. 8,831.74 8,858.38 14 -13 1/16/99 APF 10,344. 10,374. 9,019.83 9,046.94 14 -13 1/16/99 RPF 10,340. 10,344. 9,016.22 9,019.83 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED 14-13 181 -101 PERF ATTACHMENT MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STC? STRADDLE PACK, OPEN OH OPEN HOLE 0 • • , TREE = GRAY GEN 2 • SA. NOTES: H2S READINGS AVERAGE 125 WELLHEAD GRAY 1 4-1 3 ppm WHEN ON MI. WELL REQUIRES A SSSV ACTUATOR = AXELSON WHEN ON ML KB,ELEV= 71 BF. ELEV = KOP 3200' WilAngle = 44- @ 6600 = I 2196' H=. CAM F3A IL-0 SSSV NIP, ID = 4.562" 1 Datum IVO = 10178' II/ DaturnTVD = 8800' SS I 13-3/8" CSG, 720, L-80, ID = 12.347" H 2581' I — A 1 9556' H 5-1/2" BAKER PBR ASSY I Minimum ID = 3.813" @ 9642' 4-1/2" CAM DB-6 LAND NIPPLE 1 9571' H 9-5/8" X 5-1/2" BAKER SAB PKR 1 I 5-112" TBG-I, 17#, L-80, .0232 bpf, ID = 4.892" I-1 9682' I 1 9682' H 5-1/2" X 4-1/2" X0 I TOP OF 4-1/2" TBG-PC H 9682' I 1TOP OF 7" LNR I 9619' ir • • 9642' H 41/2'' CAM DB-6 LAND NP, ID = 3.813" 1 I 9643' H 4-1/2" BAKER SHEA ROUT SUB I 14-1/2" TBG-PC, 12.60, N-80, .0152 bpf, ID = 3.958" H 8643' 9644' H 4-1/2" WLEG 19-5/8" CSG, 470, L-80, ID = 8.681" H 9900. I-A • 9646' ELmD TT LOGGED 07/10/82 PERFORATION SUMMARY REF LOG: CH CNL ON 11/23/81 ANGLE AT TOP PERF: @ 1003T Note: Refer to Production DB for historical perf data SIZE SFF INTERVAL Opn/Sqz DATE 3-3/8" 4 10037 - 10066 0 05/27/89 3-3/8" 4 10380 - 10114 0 05/27P 3-3/8" 4 10118 - 10128 0 05/27/89 I 4 I. 3-3/8" 4 10134 - 10164 0 05/27/89 3-3/8" 4 10170 - 10188 0 05/27/89 - -roc (0‘ 3-3/8" 4 10204 - 10214 0 05/27/89 3-3/8" 4 10224 - 10242 0 05/27/89 3-3/8" 6 10340 - 10344 S 09/06/88 3-3/8" 4 10340 - 10374 0 01/16/99 t it* I • 3-3/8" 4 10476 - 10498 S 09/06/813 3-38' 4 10530 - 10546 S 09/06/88 3-3/8" 4 10581 - 10599 S 09/06/88 3-3/8" 4 10606 - 10630 S 09/06/88 1 7" LNR, 290, L-80, .0371 bpf, ID 6.184" H 10762' ttst“. ••••••••■ I TD H 10765' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNfT 11119181 ORIGINAL COMPLETION WELL: 14-13 02/15/01 SIS-MD FINAL PERMT ND: 1811010 10/28/01 RN/1P CORRECTIONS AR No: 50-029-20624-00 12/18/03 BHC/TLH PERF CORRECTIONS 1 SEC 9 T1ON R14E 2235.18 FEL 183,04 FNL 02/14/11 P43/JAI) ADDED SSSV SAFETY NOTE 01/16/12 TMN/JMD ADOEDI-26 SAFETY NOTE BP Exploration (Alaska) • • To: J.Bixby /R. Liddelow Date: 26 March 2012 Well Operations Team Leaders From: Anthony McConkey, EWF Production Engineer Code: APBINJEC Subject: 14 -13i WSO w/ HEX plug IOR: 100 bopd 1. S Drift and Tag as deep as possible. 2. E Set 350 -700 HEX plug @ 10,260' MD (mid - element). Current Status: Water Injector Online • Last Injection Data: 03/26/12 22,119 bwpd @ 1374 psi WHIP Max Deviation: 44° @ 6600' MD Minimum ID: 3.813" @ 9642' MD 4 -1/2" CAM D B -6 Land Nipple Last Tag: 08/03/06 Tag @ 10430' MD for Fill Clean Out Last Drift: 05/03/06 3.50" CENT to TT @ 9645' MD Latest H Value: N/A Injector Tie -in Log: 11/23/81 CH CNL Log Well Objective: The objective of this program is to set a 350 -700 HEX plug at 10260' MD in order to shut off injection in • zone 2 &3. The HEX plug will isolate the 27/31 P perforation, allowing increased injection in the 41 P — 44P zones and optimizing waterflood performance in the 14 -13 pattern. Wellwork Justification: Historically, injection into zone 2 & 3 supported many of the offset wells in the 14 -13 pattern. Evaluation of the pattern during the most recent pattern review in January 2012 suggests that injection into these lower zones is no longer benefiting pattern conformance. None of the wells within the 14 -13i pattern produce from the 27/31 P (illustrated in Figure 1 below). Page 1 of 8 / 1;33 \ 14-15: Online 4-0 14 -32: Online , .r Adperf through scab ------ liner in the 42P. Last spinner resulted - , 100% in erroneous spinner 1 / \ Producing 100 /o from results. Temp/density �''- 1/�s4. 42P. , suggests that majority 't ._ t . _� � production from p of - " y = 14 34: Online 44P saueezedoefs. s l ' \ Severe split pipe along - `' 1: liner. Producing 100% 1 4 -13 INJECTOR \ 4 - • - � „ � �� from Zone 4. 43P -1% 4 111 42P - 23% 4- IUMPI1 14 41P -11% .)1 11111 1' } 4 ,' ' 27/31P - 65% $ 1 \ 14 -07: Online - -' .' :‘ 11 a i Sag-18/0/5 .ai i .i i 46P - 77 / 91 / 93 ■ _ 44P -5/9/2 14 -12: Online •L =�'� .,, (No clear interaction w/ Sag - 24/4/2 s 4' Ill iii • '' 14 -13i) 42/43P - 76 / 96 / 98 Figure 1: Map of 14 -13i pattern, including interactions Currently 14 -13i has a target injection rate of 16,000 bwpd, and 65% (10,000 bwpd) of this injection is going into the 31 P /27P interval. This 31 P /27P injection is essentially being wasted since no offsets have offtake from this interval. Setting this plug will restrict injection into Zone 4 and improve injection support to the offset producing wells. Isolating injection into Zone 4 will enable this well to inject an additional -3,000 to 5,000 bwpd into Zone 4 based on historical injection performance. Using the typical Prudhoe value of water of 0.03 bo /bw, this would suggest an incremental oil benefit of -100 bopd. • An HEX plug will be used for the zonal isolation for its ease to be removed and re -used, which may prove very valuable if it is ever decided to re -open injection in the lower perfs. The plug is also capable of holding high differential pressures which will increase the chance of success for zonal isolation. Page 2 of 8 • • Objective of Program 1. Set the HEX plug to SO the water injection to zones below 10260'MD - providing increased • injection to the higher perforations in the well. Slickline 1. Drift and Tag TD w/ 3.5" Dummy Plug 2. Record final depth of tool. 3. POOH. E - line Arrange pre job meeting with all involved personnel and discuss handling and operation of the tools. Ensure that required retrieving /fishing tools are available. Check the color codes for adapter kit and the 4 Zink barrier arrangements so we are sure the color code matches the ID of the tubing the plug will be set in. Tie -in to log: 11/23/81 CH CNL Log 1. Check connection between Omega Hydrostatic Setting Tool and CCL or other connections to wireline running string. Apply voltage from logging unit through cable, cable head and CCL. Record voltage from power panel when 12VDC is reached below CCL. 2. Perform a shortcut test in steps 20V / 50V/ 100V and 150V below CCL and record the current (amp. on the power panel) at each step. 3. Connect the omega motor to the CCL and test that the motor is running and record the current (amp. on the power panel) before running in hole. 4. Make up adapter kit to the HEX Bridge Plug and Omega Hydrostatic Setting Tool. Ensure that all the connections are secured with lock rings or set screws. Do not lift the setting tool and plug from horizontal to vertical with setting sleeve made up against the plug. Remove clamps on element. 5. Make up connections from setting tool to CCL and tool string. 6. Install assembly in lubricator and start pressure test. Note: Go through completion schematic with winch operator and discuss where to take care while running in hole. 7. Run into Well bore; care to be taken when passing restrictions and profiles such as sub surface safety valve, and nipples. Do not at any point exceed 100 feet/minute (35 meters /minute). 8. Correlate depth using E -line CCL and reach setting depth in upwards motion. 9. After reaching setting depth of 10,260' MD (mid - element), power up to activate setting tool. Two "kicks" on the weight indicator may be observed during the setting. One will be the shear pins Page 3 of 8 • • and the other the shear stud. Watch the current (amp) while sending power down to setting tool. The current should be between 20 and 100 mAmp. 10. Observe weight loss on weight indicator. 11. Run back in hole and lay down weight to assure the plug is set. 12. Pull out of hole. 13. Visually check at surface that the setting prong has been recovered intact and shear stud has sheared properly. 14. RDMO. Page 4 of 8 S • 0 Mini log for Well TeChlOg Project 1,81.1_,WF 14-13 Aarc, LAURAJ. LARSON Scale 1 SOO Ult. icweezon Injector Well 14-13 uwt: 300292062400 Elevation: 71 5: 6194,7.08 f eet SPUD deit• 1961-10-26 00:0000 - ,urit , , USA .hort name 14 Elevation detturc 65 Y: 5940233.47 feet C01780008 d 1, 1961-11-1900:00:00 F441 PRU01406 1„,, nn'. : 0111111SITE 14 FM 13 Total depth: 10745 longitude: -1411.543044 Status: Stat.. Masks Co.orlusatt systors: NA527 MT 1.1441414: 70.239434 Otrtratar : OPX4 <Alvan , eamA 43 a. li i i NOSS MP , " ,. . • ' s ,,,,, Ift) rt” Comments n (Au 1:900 1'900 g FY 481.9ti• Ati) : r .' ' ' ' ' .•-• —;.'„ y'149.4"1"iiitt"Wit.s.°e SW 1010a ..., Glt 9176 m .160 oss Fe a. Z . . . • . • E211111/ a - , ■ & 1ni11111111117.,... . v.., . , • . Illi annommemill6,...- ::, T1140 ' 1111 •---- --.A1----,„„„ ' 10000" . 3 1 - ki ......... ,...... . PEW ass - 8700 : . .—.■ Z. " ....-..,„ 10100. i ' 1r CU . a 1,5 i 111 ' .■•••■•••■• < 1 r............ 1> i. 0800 .‘ OM F04 • ,... ' it IN1 1 . . 10200: i 1 4 11*- , .--... . OE111 04 t • HEX Plug set ilite. 11111111°"" --- ' . • @ 10260' MD ism . .c. IIII 7 1900 . 3 . 1000.— t — . ' A Li ; : • '.... , . . - 9000 10400- 0111/ Au .--.- , 1111111 . . 1 All IP ........ 111 i - . . . 1. EM ) III . . , • 10500. .--- 507 •44.! --••••••••-■ Allt I l ' -. • .. . _ • . ...--. .... • L ,. • . ., ... ...., . ... .-- _ . ...—.... MI 4 , ----s. . . .. . . , . i gion 107007 " . • . il . ..- "7: ..,.... fz- _-.. '. ...- Ne . . . .-- 1. — -4 • Page 5 of 8 • 4110 . . Cl 4' — i 1 / 1 ,, e ' — . — i , 111111101111111111111111 COMPENSATED NEUTRON LOG Schlumberger CASED HOU N COMPANY Ail ,A NT1C RI CHI? ! Eli) COMPANY - _ - I - :- WELL nxt Li,. SITE 14-13 1•2 >-- — ; FIELD, PRUDHOE RAY . ti ,.- COUNTY.. NORTH S I AVE STATE ALASKA 1402' S & 1019' W OF NE CORN . °thet SenriCti: 2 , n-, •-: 11: • 4 Z s• V ... C 1 S ^CY RO r 2 i ti 50-029-20624 CI S-RALL VAL. 6. il IERIAL NO SEC, T I I g Ar S I g I I I ON WP -0 V TANGE 9 14E 1 , i Permanent Daturn: MSI ; Elev.: 0 Elev.: K.B. 71 Log Measured From. KB 71 Ft. Above Perm. Datum D.F. Drilling Measured Fro GL. 40 Date 11 /23181 MTH ENfilktRimi Run No. ONE Depth—Driller 10722 Depth (Schl.) 1.0718 Bun. Log Interval 10715 1 C.)6' FILE Top Log Interval 9200 GNI., 2600 CR , JON CCI . Type fluid in hole DI ESKI. - Salinity pp Na CI, . Density • Fluid level Max. rec. temp., deg F. . . Operating rig time Truck no. 0 Truck no. 7856 I I i i Location 4614 ' L Recorded by RATHERT Witnessed by 1111.1. RUN BORE-HOLE RECORD _ CASING & TUBING RECORD No. Bit From To si Wgt. Rar emks From To . . _ . ' _ .. . Page 6 of 8 . . : • =MP JMMI= = s !M!!!!ilirsNP'.__I _M__ IIIII[M!M!M!M; • !i!!liiNNIMMA, 11•111• ! #liiMMiii■ • O IIIMMIMMINININIMINIMMINNIMMIIIMMIIIIIMMIMINIMIIIIIMMI MINE IMIMIMIMI/lii • !Midi --! 1111•11111MMIMMINNIMIMISOMMIll -- 4• ii!!lliiiE•l /i- — E•_M_M__ ■ MMM— Mlii!!! —E•._I _M__ E•lailiiaa•l■ • lii— M— Milri:!— EL.— Ea•!!M• MItfii!lMMIMIS N 0 MIMIIIMEIM/ __/aaFlMIM:iiEESM _i IaEPlllllllMI!•■ MIlill iilMIL7iii /[>•iiiii ln1MMIiiils■ liiii aa■iiiG.1li�'� iE3EMM! WIN iiMIr■Eliii•■ U MIli MiiaR7 IMIE _ ___ 7sEli■t•MMiis■ liiMMMMMGi•!<QSMa>•MIHiI MINN MIi!liiiss iiMIMIli _ ___ MIE►.7lESEliii! MIM (111•121•1111111••••••••••111111111 IS 0 liiNMi MMMis►' MIMs.1iE iMIMIii MlMI!liii■■ _iii! ! 'r •11111111.11•1111•1111•11111•• • 41.11111/74111111111111111.111111111111•MINIIII MI ME EMEMIl !a \ /iis ■M77�1 = ! ii:iMIiliii! • O :� _ _ ■<siii�i!!N • aas M 1111• MI ME• ■ p i�iisaa ! =Ai =MI / —MI_■ • !!MI!l IMIMIEIG3 IMIMI• NIIMMJNIMMIIMINMMIIMI NI !•MIMM!!ii• • liiii /MIi! IIMMIiiiliii ii' �ili'i■ al O t •i"'�MIiili■ ■ !il•Bil iMISiMIi■ MI _ !! :711i•IIi i aESSLfaESI!!ii • : j .._'._ I � m III iiE� i iEr•• • 10200 MINIMPt.7iNsOMONIIMMIIIIIIIIIIIIIIII IN •••!0s'3M•i■L•••••_ M■siiii III ■ 0 !mnim!'amm■iiii 111111•11i!• 11 liisf Eat AlESElilii !liiiMIiii• ■ !.�laEilil�MiMi! !l��iilMiis II ixsr.- ..aiawl>• n11•• Z•11i MIilMti i iitliiii M a!lMii•■ IIIIIIMMMINIIMINIIMINIMIR IINIMMIBINIU= I maw 1i _ _ • no IIIMMEMINIMIMIMMINIII i/ — as MIMI — MIMIlcil!!I!".EIrrMIS•iIiMIMI I El.MMMM•■ . MiiililMIE►7 ■i / Ml�i! iE man s a s'' - MIlMIiii■rcii.7inoma■iMI • iiMiliiliMI 2MI ____ ■ liiiiliiii _rsLiliiiMI El►Ji •r•riiiis■ 11111111■. 5 _a.--- M—ii•• INIIIMMINNIIIIIIIININIMINIMINNINIMMINIMMIMIMMIMMINIIIIIMM i'"!I■MIMS• liMilliMISTS += irfilMii l ilr�fii ■■ Mi !liiisE'.IMiMI ■s lii— MlMIMIa•NN: .1111••W>tNIIIIlii MiiTriii ■■ gmlumuNi•NEN MillnwoliIIMININIIIMMINIIIIINIMIN IMMM_IIMIr___ Mf MIMEO !MINIMUM • !MMlii�MI i""" - "" ∎rama,7ll MI /ll• • ls•••• li /illlsrallPES llEr•a•ai• 110iriaril ,- ! •MlsC4i•[sLMii li a - aa '?�lm�?■� •EwMlMMI ■■ H EX .Plug set MI 111.1 0.1. wo NMI AIM M•11•1111•11•111111 ■ l/ MISyMI!► ∎ MIMIiii sMOs�iii ■■ 0260 v 13 - .. �s�M>iiCM�� i Mali i■� • ■ ■• mi - - - er e ent lMMIMI�7liELlMii II ■ t) =m: 1"z in U.• •IREFAIMINIIIMIN•1111111M11= 11 iE`Pii!! • is i!!! a i! i.'m+e i•�iiiii//ss 10300 ! r�iiaECSmiE�� iii /MI BMW IM • M M i �� t i i �_''�, �i! S • iiMili�i� =1.111 1 i MEIN. is a M ri�iii WIL =II a Ili -- - MIii■■1 s■ MM - IEIIIIl___ lINFiiii —M•■ — MilmEIIIIIIiilaL =rs 11•M TENS(LB ) 5000. 0.0 CCL ( ) RN{2At ) -19.00 1.000 5.000 0.0 GR (GAPI) MPHI< ) 0.0 100.0. 0.6000 0.0 PARAMETERS MAME UNIT VALUE NAME UNIT VALUE NAME UNIT VALUE HC CALI PSNR 2.097 BS INCH 8.500 FPHI PHIX MATR SAND DO 0.0 BHS CASE Page 7 of 8 • • TREE= GRAY GEN 2 SAFETY NOTES: H2S READINGS AVERAGE 125 WELLHEAD= GRAY` 14 -13 ppm WHEN ON MI WELL REQUIRES A SSSV ACT �� R= AXELSON I WHEN ON ML 1 BF. ELEV = KOP = 32001 Mix Angle = 44° @ 6600'; 2196' H 5 - 112" CAM BAL -O SSSV NIP, ID = 4.562" Datum MD = 10178'' O Datum TVD= 8800' SS' 13 -3/8' CSG, 724, L -80, !D = 12 347" —{ 2581' — 9556' H 5 -1/2" 3AKPR Ptili ASSY I Minimum ID = 3.813" § 9647 4 -112" CAM DB -6 LAND NIPPLE 9571' H 9 -5/8" X 5 -1'2" BAKER SAB PKR 15 -1/2" TBG -PC, 17$, L -80, .3232 bpf, ID = 4.892" 9582 J / I 9582' — 5 -1/2" X 4 -112" X0 'TOP OF4- 1 /2"TBG -PC H 9582' TOP OF 7" LNR I—{ 9619' 9642' H 4-1/2" CAM DB-6 LAND NIP, ID = 3 813" 9643' H 4 -1/2" BAKER SHEAROUT SUB 4-1/2" T8G -PC, 12.6 #, N -80, 0152 bpf, 10 = 3 958" H 9643' / \ i 9644' 4 1/2" WLEG 19.5,8" CSG 47$ L -80, ID = 8.681" I—I 9900' I--, 9645' 1 - 1 ELMD TT LCGGED 07/10/82 1 PERFORATION SUMMARY RE LOG: CH CNL ON 11/23/81 ANGLE AT TOP PERF: 28` @ 10037 Note Refer to f'oduction DE for historcal pert data SIZE SPF INTERVAL Opn /Sqz DATE 3 -318" 4 10037 - 10066 0 05/27/89 3 -318" 4 10080 - 10114 0 05r2 7189 3 -3/8" 4 10118 - 10128 0 05/27/89 3 -318" 4 10134 - 10164 0 05/27189 3 -318' 4 10170- 10188 0 05/27189 l HEX Plug set 3 -318" 4 10204 - 10214 0 05/27/89 @ 1 0260' MD 3-3/8" 4 10224 10242 0 05/27189 3 -3/8" 6 10340- 10344 S 09/06/88 ' in 7" Liner 3 -3/8" 4 10340 - 10374 0 01/16/99 3 -318" 4 10476 - 10498 S 09/06/88 3 -318" 4 10530 - 10546 S 09/06188 3 -3/8" 4 10581 - 10599 S 09/06188 3 -318" 4 10606 - 10630 S 09/06/88 7" LNR, 294, L -80, .037' bof, ID = 5.184" 10762' ••••••11-0/ WAWA TD - 10765' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/19/81 ORIGINAL COMPLETION WELL: 14 13 02/15/01 SLS -MD - IM L PERMIT No: '1811010 10/28/01 RNTP CORRECTIONS API No 50- 029 - 20624 -03 12/18/03 5HC/TLH PERFCORRECTIONS SEC9 -10N R14E2235.18 FEL 183.04 FNL 02/14/11 MB /JMD ADDED SSSV SAFETY NOTE 01 /16/12 TMN/JMD ADDED H2S SAFETY NOTE BP Exploration (Alaska) Page 8 of 8 " 7IML010 • TIME SHEET 05/15/12 10:49 Reg : _40.00 Personnel ID: G5070 TOUSSANT A C OT : Time Period : 05/14/12 To 05/20/12 UO : Notes : 1 Other : T/S Model : ;GCI WIRELES Reload: N Status: ORIG Total _40.00 MO 14 TU 15 WE 16 TH 17 FR 18 SA 19 SU 20 * - - -- Reference Status SVC H 41 42300997 01 REG____] _ ' Acct Dtl WO 142300997 01 REG _ Acct: -T; Dtt: On 1 I - H - i. - - 1I r WO 42301044 06 ORIG REG 8.00, 8.00; 8.00 L8.00' 8.00 • Acct: I+ Dtl: - E ITu - I I , - • I Acct: E Dtl: - 1- - Acct: r- Dtl:� - ' " L - More: Daily Totals: _8.00 _8.00 _8.00 _8.00 _8.00 Enter time charges. • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission To Jim Regg � DATE: Monday, January 09, 2012 2/ P.I. Supervisor l l '0 1 i SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC 14 -13 FROM: Chuck Scheve PRUDHOE BAY UNIT 14 -13 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry NON CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT 14 - 13 API Well Number: 50 029 - 20624 - 00 - 00 Inspector Name: Chuck Scheve Insp Num: mitCS111216075154 Permit Number: 181 - 101 - Inspection Date: 12/15/2011 Rel Insp Num: _ Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 14-13 ' Type Inj. W ' TVD 8337 - IA 205 2570 - 2557 2553 P.T.D 1811010 ' TypeTest SPT Test psi 2084 OA 255 482 478 478 Interval 4YRTST P/F P Tubing 1145 1145 1145 1145 Notes: S«r1 N NED FEB ' LUii Monday, January 09, 2012 Page 1 of 1 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 Dec 07, 2009 by ~~ DEC ~ ~" Z0~9 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 14 Dear Mr. Maunder, s_. ,~. !~l-lol ~y.-r3 Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 14 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-14 Date: 12/05/09 r Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 14-01A 1931850 500292031701 Sealed Conductor NA NA 14-02C 2071150 500292031803 Sealed Conductor NA NA 14-03A 1961290 500292031901 Sealed Conductor NA NA 14-04A 1961640 500292032001 Sealed Conductor NA NA 14-05A 1920010 500292032701 Sealed Conductor NA NA 14-06A 2040360 500292032801 Sealed Conductor NA NA is-07 1780660 500292032900 Sealed Conductor NA NA 14-o8A 2022100 500292033001 Sealed Conductor NA NA 14-098 1820340 500292053402 Sealed Conductor NA NA t4-1o 1801300 500292052800 Sealed Conductor NA NA 14-11A 2051260 500292052901 Sealed Conductor NA NA 14-12 1811090 500292063100 Sealed Conductor NA NA 14-13 1811010 500292062400 Sealed Conductor NA NA 14-14 1811020 500292062500 Sealed Conductor NA NA t4-15 1810840 500292061100 Sealed Conductor NA NA 14-16A 1971670 500292060801 Sealed Conductor NA NA 14-17A 2030010 500292056201 Sealed Conductor NA NA is-186 2071290 500292055102 Sealed Conductor NA NA 14-19 1810450 500292057800 Sealed Conductor NA NA 14-20 1810700 500292059800 Sealed Conductor NA NA 14-21A 2051070 500292075601 Sealed Conductor NA NA 14-22A 1921230 500292074701 Sealed Conductor NA NA 14-23A 2090200 500292075701 NA 4 NA 25.50 10/20/2009 14-24 1830910 500292097000 NA 0.6 NA 3.40 10/20/2009 14-25 1831020 500292098100 NA 2.1 NA 15.30 11/16!2009 14-26 1811100 500292063200 Sealed Conductor NA NA 14-27 1831700 500292104600 NA 3 NA 17.00 10/25/2009 14-28 1820120 500292070800 Sealed Conductor NA NA 14-29 1811680 500292068000 Sealed Conductor NA NA 14-30 2050940 500292067901 Sealed Conductor NA NA 14-31 1831110 500292098900 Sealed Conductor NA NA 14-32 1831220 500292099900 NA 0.6 NA 3.40 10/19/2009 14-33 1831250 500292100200 Sealed Conductor NA NA 14-34 1831330 500292101000 NA 7.3 NA 47.60 10/20/2009 14-35 1831420 500292101800 Sealed Conductor NA NA 14-36 1831630 500292103900 NA 0.7 NA 3.40 10/20/2009 14-37 1880490 500292181000 NA 1.3 NA 5.10 10/20/2009 14-38 1881030 500292186200 NA 0.8 NA 3.40 10/24/2009 t4-4oA 2011350 500292187501 Sealed Conductor NA NA 14-41 1920960 500292229000 NA 0.8 NA 6.80 10!18/2009 14-43 1921080 500292229600 NA 1.4 NA 10.20 10/23/2009 14-44A 2021930 500292257301 NA 10 NA 88.40 11/24/2009 ` STATE OF ALASKA ALA OIL AND GAS CONSERVATION COM~ION REPORT OF SUNDRY WELL OPERATIO~ka q~j 1. Operations Abandon ~ Repair Well Q. Plug Perforations ~ Stimulated Othe 1 - Performed: - '~~" Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~ATMENT Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 181-1010 - 3. Address: P.O. Box 196612 Stratigraphic Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-20624-00-00 7. KB Elevation (ft): 9. Well Name and Number: 71 KB ~ PBU 14-13 , 8. Property Designation: 10. Field/Pool(s): ADLO-028312 ~ Prudhoe Bay Field/ Prudhoe Bay Pool 11. Present Well Condition Summary: Total Depth measured 10765 ~ feet Plugs (measured) None true vertical 9405.28 ~ feet Junk (measured) None Effective Depth measured 10421 feet true vertical 9090 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" Surface - 108' Surface - 108' Surface 2553' 13-3/8" 72# L-80 Surface - 2581' Surface - 2581' 4930 2670 Intermediate 9882' 9-5/8" 47# L-80 Surface - 9900' Surface - 8626' 6870 4760 Liner 1143' 7" 29# L-80 9619' - 10762' 8626' - 9403' 8160 7020 Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: _ _ Tubing: (size, grade, and measured depth) 4-1/2"17# L-80 SURFACE - 9643' 0 0 - Packers and SSSV (type and measured depth) 9-5/8"X5-1/2" BAKER SAB PKR 9571' 0 0 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 11697 393 Subsequent to operation: 11962 408 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory ; Development Service Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas ~ WAG ~ GINJ ~'' WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preb Title Data Management Engineer Signature Phone 564-4944 Date 10/20/2008 ~ ~ ~ ~ Y 2008 Form 10-404 R vised 04/20 ~°f F-_ ~ ~ ~ ~ Submit Original Only ~ 14-13 181-1010 PERF ATTACHMENT s• Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 14-13 7/11/82 PER 10,134. 10,164. 8,831,74 8,858.38 14-13 7/11/82 PER 10,170. 10,188. 8,863,72 8,879.73 14-13 7/11/82 PER 10,204. 10,214. 8,893,98 8,902.91 14-13 7/11/82 PER 10,224. 10,242. 8,911,84 8,927.95 14-13 4/15/83 APF 10,080. 10,114. 8,783.93 8,814.02 14-13 4/15/83 APF 10,118. 10,128. 8,817,56 8,826.42 14-13 11/22/84 APF 10,037. 10,066. 8,746.03 8,771.58 14-13 11/22/84 RPF 10,080. 10,114. 8,783.93 8,814.02 14-13 11/22/84 RPF 10,118. 10,128. 8,817.56 8,826.42 14-13 11/22/84 RPF 10,134. 10,164. 8,831.74 8,858.38 14-13 11/22/84 RPF 10,170. 10,188. 8,863.72 8,879.73 14-13 11/22/84 RPF 10,204. 10,214. 8,893.98 8,902.91 14-13 11/22/84 RPF 10,224. 10,242. 8,911.84 8,927.95 14-13 6/11/88 APF 10,530. 10,546. 9,188.52 9,203.14 14-13 6/11/88 APF 10,581. 10,599. 9,235.23 9,251.78 14-13 6/11/88 APF 10,606. 10,630. 9,258.22 9,280.36 14-13 8/31/88 APF 10,340. 10,344. 9,016.22 9,019.83 14-13 9/6/88 SOZ 10,037. 10,630. 8,746.03 9,280.36 14-13 9/8/88 APF 10,476. 10,498. 9,139.35 9,159.35 14-13 4/25/89 SOZ 10,037. 10,630. 8,746.03 9,280.36 14-13 5/27/89 RPF 10,037. 10,066. 8,746.03 8,771.58 14-13 5/27/89 RPF 10,080. 10,114. 8,783.93 8,814.02 14-13 5/27/89 RPF 10,118. 10,128. 8,817.56 8,826.42 14-13 5/27/89 RPF 10,134. 10,164. 8,831.74 8,858.38 14-13 5/27/89 RPF 10,170. 10,188. 8,863.72 8,879.73 14-13 5/27/89 RPF 10,204. 10,214. 8,893.98 8,902.91 14-13 5/27/89 RPF 10,224. 10,242. 8,911.84 8,927.95 14-13 1/16/99 APF 10,344. 10,374. 9,019.83 9,046.94 14-13 1/16/99 RPF 10,340. 10,344. 9,016.22 9,019.83 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMO VED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SOF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SOZ SOUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~: • • 14-I3 ... DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10/2312008 We pumped Bright Water Chemical (EC9360A} Surfactant starting on 10-13- 08 at 2100 Hr at a rate of 88 GPH and increased the rate to 117 GPH after the Polymer was complete at 1800 Hr on 10-16-08 and pumped at this rate until injection was completed at 1030 Hr on 10-17-Q8. Total pumped 10454 Gallons. We started pumping (EC9378A} Polymer on 10-13-08 at 2230 HR at a rate of 176 GPH and completed injecting on 10-16-08 at 1800 HR. Total chemical pumped was 21379 Gallons. The water rate stayed between 10600 BPD and 12000 SPD. JOB COMPLETE FLUIDS PUMPED GALS 10454 SURFACANT 21379 POLYMER 31833 TOTAL MEMORANDUM To: Jim Regg -; ~ i Y ;~ i Lf ~-~;i; P.I. Supervisor r-,~!jE!j ~ ~ ~" "" FROv[: Chuck Scheve Petroleum Inspector State of Alaska • Alaska Oil and Gas Conservation Commission DATE: Wednesday, December 26, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) NC 14-13 PRUDHOE BAY UNIT 14-13 Src: Inspector NON-CONFIDENTIAL. Reviewed Bye P.I. Suprv J T Comm Well Name: PRUDHOE BAY UNIT 14-t3 Insp Num: mitCS071221093253 Rel Insp Num: API Well Number: 50-029-20624-00-00 Permit Number: t81-t01-0 Inspector Name: Chuck Scheve Inspection Date: 12;1912007 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~14-]3 'I'~,peln]_ i ~,y TVD I~ $337 `'~ IA ' 160 ~ 2310 2280 ?270 ~~, P T. ~i 181]010 TypeTOSt SPT I 'Test pSl ~I ! 2084.25 ~~~ OA ! ~ 180 260 18 260 ~ 26G Interval ~vxrsT P/F ~ P - Tubing ~ loo lz2o ~~ lszo '~ llso '~t NOteS' Pre-test pressures observed and found stable. ~ - - - ~~" ~~ ~~~~,~~,1a~ ~ 4: 20~~' Wednesday, December 26, 2007 Page l of t RECEIVED 08/16/06 Schlum~erger AUG 2 3 2006 NO. 3929 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth -îJask.a Oil & Gas Cons. Commission Anchorage U3G {L6\ -lot -d· Ii.. 't,J ¡,~;;:.n ~:)\.¡n, ~. '\;1-"" ¡,;; ( ~.':.t Q,;J Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay WII J b# l D D t Bl CI CD e 0 oa escrlptlon ae o or 07 -34A N/A SENSA/MEMORY lDl 03/22/06 1 C-08B 11209599 MEM PROD & INJECT PROFilE 04/22/06 1 D.S.04-11A 11211384 INJECTION PROFilE 03/29/06 1 D-10 11258702 lDl 04/17/06 1 09-24 11217261 PROD PROFILE W/DEFT & GHOST 06/12/06 1 14-13 N/A INJECTION PROFILE 08/03/06 1 V-01 40010636 OH EDIT OF MWD/lWD 07/05/04 2 1 . . Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ( f STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test ... ( {ù 3> ~(t /2 Z~ - Email to: Winton_Aubert@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay I PBU I Drill Site 14 12/23/03 Anna Dube Witnessing declined by John Crisp Packer Depth Pretest Initial 15 Min. 30 Min. Well 14-13 Type Inj. F TVD 8,337' Tubing 1,650 1,650 1,650 1,650 Interval 4 P.T.D. 1811010 Type test P Test psi 2,084 Casing 540 2,500 2,440 2,440 P/F P Notes: 4 year required test. AOGCC representative declined witnessing test. Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Well Type Ini. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi . Casing P/F Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover a = Other (describe in notes) ;s,Çt\NNE() DEC 2 1 2003 MIT Report Form Revised: 06/19/02 MIT PBU 14-1312-23-03.xls SENT BY :ARCO .ALASKA INC ARCO Almka, Inc./' ~ Post Office I ~00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 December 4, 1998 ' 4-12- 0 'IO'17Ai~I ;PRB RESOURCE DEVELOP-,. 907 276 7§42;# 1/ 1 /'" ..~ ~" ' .. !_....-.,~'~L ./ ,,~"~f'~. ,. ,.._ ~ Mr. D~vid JohnSon, Chairrr~n. Alaska Oil & (las Consenmtion Commission 3001 Porcupine Drive Anchorage, AK 99501 Fro( 276-7642 Dear Mr. Johnston: ' Re: DS14-1 ;_~. MUn...Jest. iota The purpose of thi~ letter to notify you of a change in the injection fluids into 14-13, I,j~-lor 14- 13 has been injecting water since January of 1983. Facilily modifications are currently underway to allow for this well 1o inject wateror MI. The expansion of MI injection to this pattern is for EOF1 purposes and as a result the offset producers are expe~ted to recover an addititx~l 2.0 MMBO', FKility work will be completed my mid D~ember of 1998 and the well ,is expected was, performed on '7116/95. This well is included in lhe Prudl~oe Ela¥ Idis¢lble G,~ Project if notific~tion other than this letter is necessary or you require anything else'from us, please let us know. Please call ma at 265-1501 if you have any questions. Senior Drillslte Pmduc'tion Engineer Pruclhoe Bay Resource Development APR 1 2 2000 ~ STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operators performed: Operation shutdown _ Stimulate _ Plugging _ Pertorate _X Pull tubing _ Alter casing _ Repair weli _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. ~eve~opment_ RKB 71 feet 3. Address Exploratory_ 7. Unit or Property name P. O. Box 100360 stratigraphic_ Anchora e, AK 99510-0360 service x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1401' FNL, 1017' FEL, Sec. 9, T10N, R14E, UM 14-13, At top of productive interval 9. Permit number / approval number 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM 81-101 At effective depth 10. API number 50-029-20624 At total depth 11. Field / Pool 183' FNL, 2235' FEL, Sec. 10, T10N, R14E, UM Prudhoe Bay Oil Pool 12. Present weil condition summar Total depth: measured 10765 feet Plugs (measured) PBTD tagged C~ 10415 (1/14/1999) true vertical 9405 feet Effective depth: measured 10415 feet Junk (measured) ~ ~ ~ ~ ~ ~ ~ ~ true vertical 9084 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 80' 20" soo sx PF 80' 80' Surface 2510' 13-3/8" 3000 Sx AS III & 400 Sx AS II 2581' 2581' Production 9829' 9-5/8" 50o sx Class G 9900' 8626' Liner 1143' 7" 35o sx Class G 10762' 9403' Perforation depth: measured 10037' - 10066'; 10080' - 10114'; 10118' - 10128'; 10134' - 10164'; 10170' - 10188'; 10204' - 10214'; 10224' - 10242'; 10340' - 10374'. true vertical 8746' - 8772'; 8784' - 8814'; 8817' - 8826'; 8832' - 8858'; 8864' - 8880'; 8894' - 8903'; 8912' - 8928'; 9016' - 9047'. µ. { '" , r ~~ ~ . Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 PCT ~ 9582' MD; 4-1/2", 12.6#, N-8o PCT ~ 9644' MD. „~-. ~ ~ Packers & SSSV (type & measured depth) 9-5/8^ X 5-1/2" BAKER SAB PACKER ~ 9572' MD. 5-1/2" CAMCO BAL-O SSSV ~ 2197' MD. 13. Stimulation or cement squeeze summary f , ~,~, , a,~; v ~`~+ ~ F-~ s Intervals treated (measured) (see attached) =f~ ~~s~ ~~~~~~~'' ~ Treatment description including volumes used and final pressure 14. Representative Dailv Average Production or InLction Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 4051 1113 Subsequent to operation 19195 2332 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations X Oil _ Gas _ Suspended _ Service WAG InLctor 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed --{' ' ~ ~ Title Arco Well Group Supervisor Date 7~d '" ~`~ ~ Piapared by Paul Rauf 263-4990 Erin Oba ) Form 10-404 Rev 06/15/88 • SUBMIT IN DUPLICATE ~ 14-13i ~ DESCRIPTION OF WORK COMPLETED PERFORATION Date Event Summary 1/14/1999: RIH & tagged PBTD ~ 10415' MD. 1/16/1999: RIH & shot 34' of Add Pertorations located ~: 10340' - 10374' MD (Zone 3/2C) Reference Log: CNL 11/23/1981. Used 3-3/8" carriers & shot all perfs C~3 4 SPF, 60° phasing, balanced press, & random orientation. POOH w/ perf guns. ASF. RD. Returned well to injection & obtained representative injection rate. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: SCHMOO-B-GONE Operation shutdown_ Stimulate _X Plugging _ Pull tubing _ Alter casing _ Repair well _ 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchora~le, AK 99519-6612 5. Type of Well: Development __ Explorato~__ Stratigraphic__ Service X 4. Location of well at surface 1401' FNL, 1017' FEL, Sec. 09, T10N, R14E, UM At top of productive interval 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM At effective depth 222' FNL, 2365' FEL, Sec. 10, T10N, R14E, UM At total depth 183' FNL, 2235' FEL, Sec. 10, T10N, R14E, UM (asp's 675458, 5938944) (asp's 679196, 5940163) (asp's 679360, 5940216) (asp's 679488, 5940257) 12. Present well condition summary Total depth: measured true vertical 10765 feet Plugs (measured) 9334 feet Perforate _ Other _ 6. Datum elevation (DF or KB feet) RKB 71 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 14-13 9. Permit number / approval number 181-101 10. APl number 50-029-20624-00 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool' Tagged TD @ 10421' (05/22/1999) Effective depth: measured true vertical 10421 feet Junk (measured) 9090 feet Casing Length Conductor 80' Surface 2553' Intermediate 9882' Liner 1143' Size Cemented Measured Depth True Vertical Depth 20" 300 sx PF 108' 108' 13-3/8" 3000 sx AS III, 400 sx 2581' 2581' AS II 9-5/8" 500 sx Class 'G' 9900' 8626' 7" 350 sx Class 'G' 9619' - 10762 9403' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 13. Stimulation or cement squeeze summary Open Perfs 10037'-10066', 10080'-10114', 10118'-10128', 10134'-10164', 10170'-10188', 10204'-10214', 10224'-10242', 10340'-10374' Sqzd Perfs 10476'-10498', 10530'-10546', 10581'-10599', 10606'-10630' Open Perfs 8746'-8772', 8784'-8814', 8817'-8826', 8832'-8858', 8864'-8880', 8894'-8903', 8912'-8928', 9016'-9047' Sqzd Perfs 9139'-9159', 9189'-9203', 9235'-9252', 9258'-9280' 5-1/2", 17#, L-80 PC TBG @ 9582' MD. 5-1/2" X 4-1/2" XO @ 9582'. RECEIVED 9-5/8" x 5-1/2" Baker SAB PKR @ 9571'. 5-1/2" CAM BAL-O SSSVN @ 2196' MD. u 2002 Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure Alaska 0il & Gas Cons. C0mmissi0r~ 14. Prior to well operation 02/11/2002 Subsequent to operation 02/16/2002 OiI-Bbl Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 24920 44945 Tubing Pressure 3090 3425 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended __ Service WAG INJECTOR 17. I hereby certify that the foregoing, is tr~e and correct to the best of my knowledge. ,~~f~ ,~_..~~ Title: Technical Assistant DeWayne R. Schnorr ORi ii AL Form 10-404 Rev 06/15/88 · Date April 30, 2002 Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE ~ 14-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 02/12/2002 SCMOO-B-GONE--SBG: SCMOO-B-GONE EVENT SUMMARY 02/1 2/02 LINED UP JOB WITH DSO, LOADED TRUCK AND TANKER WITH 60 BBLS SCHMOO CHEMICAL AND WAITED IN LINE TO LOAD 290 BBLS 160 DEG FRESH WATER, ROAD TO DS14, STANDBY FOR INSTRUCTIONS, UNABLE TO PUMP FROM SKID,PUMP 352 BBLS SCHMOO TREATMENT BEGINNING AT 2100PSI, IA 360, OA 0, PRESSURE SLID OFF TO 400 PSI AT 200 BBLS, THEN AT 220 BBLS PRESSURE STARTED UP AND BOUNCED UP AND DOWN UNTIL LEVELING OFF AT 1000 PSI. PUMPED BALANCE OF SCHMOO AT 1000 PSI, 3 BBLS METHANOL FREEZE PROTECT, LET SOAK FOR 3 HOURS AND LOAD TANKER WITH 185 BBLS120 DEG SEAWATER FOR FLUSH. PUMP FLUSH, PUMP 3 BBLS METHANOL FREEZE PROTECT, RDMO, TURNED OVER TO DSO TO BRING WELL BACK ON AFTER 3 HOUR SOAK. Fluids Pumped 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( :0 TEST) 6 METHANOL 60 SCHMOO CHEMICAL 185 120 DEGREE SEAWATER 292 160 DEGREE FRESHWATER 543 TOTAL Page 1 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10246 Company: Alaska Oil & Gas Cons Corem Attn: Howard Oakland 3001 Porcupine Drive. Anchorage, Al( 99501 6/18/96 Field: Prudhoe Bay Anadrill Anadrill Floppy Well Job # Log Description Date BL RF Sepia Survey Program Disk Calculation D.S. 4-30 ST 96'1 50 CNT-D' -~ 7/~ (~ 96051 0 1 D:S. 5-25 961 37 TDT-P ~- ? ! ~') 960425 1 D.S. 1-9A / PERFORATION RECORD 960529 I 1 , , , D.S. 1-22A / PRODUCTION & GAS ENTRY LOG 960529 1 1 ...... D.S. 2-18A .~ TDT-P BORAX 960603 1 1 D.S. 7-13A '/ PERFORATION RECORD 960602 I 1 D.S. 9-10 PERFORATION RECORD 960523 I 1 p:.,S,,. 9-35 ~,; PERFORATION RECORD' 96.0,526 I 1 O.S. 11-30 ~' PERFORATION RECORD 96050 9 I 1 D.S. 12-31 -/ INJECTION PROFILE 960525 I 1 ............ D.S..13-16 '~ INJECTION PROFILE 960527 I 1 D.,.S. 14-13 .// INJECTION PROFILE 960527 I I , D.S. 14-16 / LEAK DETECTION LOG 960523 I 1 D.S. 14-27 '/ INJECTION PROFILE 960527 I 1 , ,, ' I ', ...... .,,.. ~ k~r~-` i~ ~b .... Please sign and return one copy of this transmittal to' Sherrie at the above address. Thank you. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 9-9-93 1-5ST 1-24A 31-25 wS-~<~ 2-10 x2-10 2-13 2-21 3-1~ 4-4 4-38' n~9-29 11-9 11-22 12-28 ~- ~ 12-3o 13-12 14-13 /16- a ~ 6-29A 17-16 17-21 8-14-93 8-6-93 8-8-93 8-13-93 8-13-93 8-14-93 8-9-93 8-9-93 8-6-93 8-8-93 8-11-93 8-16-93 8-14-93 8-5-93 8-15-93 8-7-93 8-11-93 8-11-93 8-15-93 8-7-93 8-8-93 8-9-93 8-10-93 8-12-93 8-16-93 Production ~to% Perf Record I ~?ac~ Peri Record CNL ~oo-~ ~od ~offie ~od ~offie Pe~ Record Pe~ RecOrd Rn_- 1, 5" Sch R,m 1, 5" Sch Run 1, 5" Sch R-- 1.5" Sch R~_m 1, 5" Sch R.n 1, 5" Sch R-n 1, 5" Sch R-- 1, 5" Sch R~_m 1, 5" Sch R-n 1, 5" Sch R.n 1, 5" Sch Production q.~-'~t55 R._- 1, 2"&5" Sch Baker IBP ~%0-[o>~z R-n 1, 5" ~h TBG Patch Set Record Run 1, 5" q~0-lO~/~h Leak Detect ~0 - lv~ Run 1, 5" Sch Perf Record,2z~ -) ?..cz>~ Peri Record ~1o70.-- I tq ~ 0 R-~ TBG Patch ~3~o-~co R-- Inj Profile/S~-~- ?°--e~R.- Peri Record ~r'~o-~z Microsetsmtc Survey Inj ProfllelS~-~~> R-- Microseismtc Survey Rnn Peri Record ~v~o-~~2 Completion ~%~-~Sao 1, 5" Sch 1, 5" Sch 2, 5" ~q~o- to 1, 5" o~h 1, 5" ~m0- {z~ h 2, 5" ~'~o- Sch ~/z-~0 1, 5" Sch 1, 5" Sch RECEIVED BY~~ Sonya Wnl!nce ATO-15~ * The correct API# for 1-5ST is 50-029-20076-00. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-20-93 REFERENCE: ARCO CASED HOLE FINALS 1-28 ~ %-18-93 3-25A [?'~3 6-17-93 3-31 ~V-~ 6-16-93 3-32 ~ ~/-~r7 6-15-93 3-33 ~ ~- ;. o 6-16-93 4-8 ?f.-r~ 6-11-93 5-14 ??-~ 6-12-93 6-22A ~ ~.~76-6-93 6-22A 6-10-93 7-25 ~-~' f. 6-6-93 9-44 ~ 0 - ~ ~6.6.93 11-18 f~- ~i~6-7-93 14-6 Y V ~6-8-93 14-8 7~-/,7 6-10-93 14-13 ~7~016-13-93 14-15 tF~ 6-8-93 16-4A ~z'~¢~6-9-93 16-17 [~" zz~6-14-93 16-31 ~ ~"~ { 6-7-93 17-4 ~0-~g~ 6-14-93 AGI-5 5~-,~-6-13-93 AGI-6 ?]-o~ 6-14-93 AGI-7 x _6-8-93 AGI-7 } {~'~-!6.15.93 AGI.7 6' 17-93 AGI-8 ~ ~3 3 Prod Profile Completion Record Plug Setting Record Plug Setting Record Plug Setting Record Perf Record TBG Cutter Record Leak Detect Leak Detect Perf Record Perf Record Production Log PITS/Leak Detect Leak Detect Inj Profile Completion 'Record Prod Profile ~ Lift; Perf Record Production Log Completion Record Completion Record Completion Record Perf Record R~!n Rnn R~ln Run Run Run Run R~n Rl_~_n Run Run R~ Run R~ R~ R~ R~m Rnn 1.5" 1.5" 1.5" 1.5" 1.5" 1.5" I 2" 1.5" 1.5" 1.5" 1.5" 1.5" 1.2"&5" 1.5" 1.5" 1. 1'&5' 1.2"&5' 1.5" 1.5" 1.5" 1.5" 1.5" 1.5" 1.5" 1.5" Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch /6-9-93 AGI-9~ ~ ~.3I 6-9-93 GR/CCL Rim 1.5" Sch AGI-91 -t' 6-17.93 Perf Record Run 1.5" Sch Please sign ~d re t~~~che~u ~~ .......... ATO-1529 ~., 93073 #BPX # STATE OF ALAS~ * The correct Al'I# for 3-32 is 504Y29-21141-00. ** The correct well name for this log is 6-22A. ARCO ,~lAakn, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 11-3-92 REFERENCE: . ARCO CASED HOLE FINALS 10-3-92 Prod Profile Run 1. [~' Camco 9-28-~)2 Leak Detect (Flexstak) Run 1, [~' Camco ~)-14-~)2 Inj Profile Run 1, [~' Camco 9-21)-g2 InJ Profile Run 1, [~t Camco 10-2-1)2 Prod-InJ (Flexstak) Run 1. [~* Camco 9-19-92 Leak Detect Run 1, ~' Camco 9-26-92 GR/Collar Run 1, [~' Camco 9-27-92 GR/Collar Run 1. [~' Camco 9-25-92 Prod Profile Run 1. [~' Camco 9-14-g2 Prod Profile Run 1, [~' Camco 10-2-92 InJ Profile Run 1, [~' Camco ~)-4-92 Prod Profile Run 1, ~' Camco '10-4-92 InJ Profilc Run 1. [~t Camco 9-26-~)2 Prod Profile Run 1, [~' Camco 9-26-92 GR/Collar Run 1, [~' Camco 10-5-92 InJ Profile/PITS Run 1, [~' Camco 9-27-92 InJ Profile Run 1, [~' Camco 9-1~-~)2 Leak Detect Run 1, [~' Camco 9-27-92 Prod Profile Run 1, [~t Camco 10-4-92 InJ/Shut-In Temp Run 1, ~' Camco 10-2-92 InJ Profile Run 1, [~' Camco 10-2-92 InJ Profile (Flexstak) Run 1, [~' Camco 10-1-92 ~ InJ Profile Run 1, [~' Camco 9-15-92 InJ PrOfile Run 1, [~' Camco 9-17-92 Prod Profllc (Flexstak) Run 1. ~' Camco 10-1-92 Prod Profile Run 1, [~' Camco 9-28-92 GR/Collar Run 1, [~' Camco 9-28-~)2 Prod Profile Run 1, [~t Camco 9-15-92 Prod Profile Run 1, [~' Camco 10-1-92 Prod Profile Run 1, ~' Camco Please sign and return~]le attac~e~d copy as receipt of~C E I V Have A Nice D~ J ,/ '"' Alaska O~l & Gas Cons. COmmission Anchorage) Sonya Wallace APPROVED ._.~~-~_ ATO- 1529 Trans# §224,~-'~ ..... # CENTRAL FILES # CHEVRON # LUCILLE JOHNSTON # EXXON # MOBIL # PHILLIPS PB WELL F~ # BPX # STATE OF ALASKA ARCO ALASKA, INC. { F'.O. BOX iOe360 ' ANCHORAGE, ALASKA 995i~ REFERENCE. ARCO CASED HOLE FINALS 3-22 t~-"~8-90-- GR RUN i , 5' HRS * 5-20 4-22-9i SB.L,SCL RUN t, 5' ATLAS 6-7 i2-5-90 TEMF'/SF'INNER RUN i, 5' HR'S 7-28 5-4-9i LEAK DETECT. RUN i, 5' CAMCO 9-S i2-iS-9¢ CORR GR RUN i, 5" HRS 9-45 t2-te-9¢" TEMF' '' RUN i, 5' HRS i2-5 i2-28-9e GR RUN t, 5' HRS t~ ~, ~ o-9 ~-UB ~-i ~ t VERT!LOG J;:i. Jb~ i , 5" ATLAS i2-t8 5-3-9i PROD. F'ROFILE RUN 2, 5' CAMCO t2-29 5-5-9i PROD. PROFILE RUN i, 5' CAMCO ia-i. 3 5-t-9i INJ. PROFILE RUN t, ~ ~" CAMCO i6-6 5-6-9! COLLAR/PERF .... RUN t, 5' Al'LAS t6-9A 5-5-9i CBT RUN i, 5' SCH t6-9A 5-5-9i -- CET RUN t, 5' ...... SCH i6-9A 5-6-9i PACKER REC. 'RUN t, 5' ' ' '('SCH i8-ii 5-4-9i GAS DETECTZON '-~ RUN i, 5' ......... CAMCO _. PLEASE SIGN AND RETURN THE ATTACHED ~CoF'Y AS'RECEIF'T OF DATA. - RECEIVED BY. __ ~ · HAVE A NICE DAY! . SUNNY WALLACE . AF'PROVED AT0-~529 "TRAN$~ 9i D I~'T R I BI_~T I ON CENTRAL FILES -,-~'F:HILLIF'S' CHEVRON F'B WELL FILES D & M R & D E,(TI--.,....:. ION EXF'LORATION ~ BF'X EXXON -,,.'"' S'TATE OF ALAS'KA MARATHON TEXACO MOBIL THE AF'I~ FOR 5-2~ IS 50-¢529-22i37 · . RECEIVED - WAY 2 5 1991 Alaska Oil & Gas Cons. oommj~'_~'! Anchorage ARCO Alaska, In~L Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 10, 1990 Mr. John Boyle Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear John: Please canCel the following 14 Forms 403 for which no Forms 404 were written. Per the drill-site engineers, this work has not'been done. and is no longer planned. D.S. ~ Date Signed 1987 3-4 7-51 1/26/87 4-6 7-263 4/20/87 4-10 7-188 3/20/87 4-10 7-238 4/8/87 4-14 7-264 4/20/87 5-8 7-624 9/23/87 9-16 7-291 4/27/87 14-13 7-399 6/18/87 14-30 7-100 2/13/87 16-24 7-117 2/26/87 1988 3-9 8-826 11/2/88 3-13 8-854 11/17/88 6-13 8-316 4/28/88 9-34 8-864 11/21/88 ,.6,,-4,,10 if you have any questions '~ "~ ~ .... ~ ..... Please call me at '~ ~ ~ c,,n,.,.r, ,,ng these q' S. T. H~ffecke, t/~ i~ecoras t-'rooessor STH/ab/034 J. L. Glaeser - ATO 1528 l~ CC: ,RECEIVED ARCO Alaska, Inc. is a SubSidiary ol AtlanticRichfieldCompany APR 1 Il 1990 AF¢(":O ;Ai_A2KA, iNC,. F'.~ 0 ~ BL)X i ,:'-'::,'..?.,360 AN. Ci4,0RAGE: ALA2K~'~ 99.5i DATE' ,-_'~-i 4-00 REFERENCE' ARCO F'RE~SURE DATA i-tA i i-"23-89 BHF'--£TATiE: GRADIENT 2--8 1i-36,-89 BHF ....2.'TATIC GRAD]:ENT 3--7 i.-'~-4-8c~, BHF ....STATIC:_ C. RAD i EMi' ~..-z i'A i i -25-89 BHP--;:~'t-ATIC Gq'ADIENT,, 4-"9i~.. i i-24-8o, BI..IF: ....... ,'~-* ~" A TTr': ,. ,., GRAD l' ENT 7-5 '2-~r-4'~ '27 - 8 ",-7 Bi4F ..... £'TA'F ! C,GRADIENT i ;5-5 i i -24-89 BHF ..... :";;TAi"IC GRAD]:ENT i3-9 i'2-i6-89 BHF ....STATIC C;RAD;[ENi- i,5-22 t2-i6-89 BHF ....STATIC GRADIENT ! 4-i 3 t 2-6--89 BHP--;~.~TATIC 'GRADIENT i4-2'7 t2--t7-89 BHF ....J;TAT!C; GRADIENT t 4--.3i t 2-4-89 Bt-iF .... Z'rAT.[C GRAD,ZENT i*.,.'"'- ~ A._,~ i 2-t 6-.Ro_, BHP--$TATIC GRAD ]: ENT CAMCO CAMCO CAMCO CAMCO CAMCO C A M C 0 CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCC) PLEASE ~IGN AND RETURN THE ATTACHtED CO Rt_-'.-'.CE ]: VED BY HAVE A NI. CE DAY! ;":: A L L Y HOFFECKE:R ATO-t 529 FEB 1_ 61990 · · Alas~ Oil & Gas Cons..6~sCB... - . Anchorage ~$TR~BUTION PY A;~ RECEIPT OF DATA. I'RAN$~ 9r'3 · '" CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON' '" MOBIL F'H ILLIP,?? PB WELL FILES R & D BF'X STATE OF ALA:ZKA TEXACO ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 17, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 14-13i, Approval No. 8-274 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/TAB/jp Attachment cc: J. Gruber, ATO-1478 PI(DS 14-13i) Wl-3 RECEIVED OCT 2 0.1589 41aska 0it & Gas Cons, Cornrnisslor~ Anchorage ARCO Alaska, Inco is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-O STATE OF ALASKA ALASKAi[.~ _ AND GAS CONSERVATION CC;( ,"IISSION REPORT OF SUNDRY WELL OPERATICI q% ..,.,... ~, 1. Operations performed: Operation shutdown Plugging Perforate X IGIN, L Pull tubing AItercasing Repairwell Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM At effective depth At total depth 183' FNL, 2238' FEL, Sec. 10, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 71' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 14- 13i 9. Permit number/approval number 81 - 101/8- 274 10. APl number 50 - 029 - 20624 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 10765 feet Plugs(measured) true vertical 9405 feet Effective depth: measured 10721 feet true vertical 9364 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx PF 80' 80' Sudace 2510' 13-3/8" 3000 sx AS III & 400 sx AS II 2581' 2581' Production 9829' 9-5/8" 500 sx CI 'G' 9900' 8626' Liner 1143' 7" 350 sx CI 'G' 10762' 9402' Perforation depth: measured 10037 - 10066'; 10080 - 10114'; 10118 - 10128'; 10134 - 10164'; 10170 - 10188'; 10204- 10214'; 10224 - 10242' true vertical 8746 - 8772'; 8784 - 8814'; 8817 - 8826'; 8832 - 8858'; 8864 - 8880'; 8894 - 8903'; 8912 - 8928' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT@ 9582' MD; 4-1/2", 12.6#, N-80, PCTTail @ 9644' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 9571' MD; 5-1/2", Camco BaI-O SSSV @ 2196' MD i3. Stimulation or cement squeeze summary Intervals treated(measured) SEE ATTACHED RECEIVED 14. Treatment description including volumes used and final pressure OCT 2 0 ]989 Representative Daily Average Production or Injection Data ........ """ & Gi~ doris. OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 'ArlcJjll~i~'~"~u~'~ Prior to well operation - - 18386 .... 378 Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16127 .... 1070 16. Status of well classification as: Oil Gas Suspended Service INJECTOR 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .... ~ Title Operations Engineering Manager Form 10-404 Rev 06/15/88 T.A. BILLINGSLEY Date /PZ ~/~"~ SUBMIT/IN D/UPLICATE DS 14-131 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE : INJECTION PROFILE MODIFICATION 8/31188 : Squeeze perforations were shot as follows: MIRU equipment, and pressure test BOP's. RIH w/perf gun, and shot: 10340 - 10344' MD Ref. Log: CH CNL 11/23/81. POH. Rigged down. 9/2/88 : A Pre-squeeze Mud Acid stimulation was performed,as follows: MIRU equipment, and PT equipment to 4000 psi. RIH w/CT and washed perforations at: 10037 - 10066' MD Ref. Log: CH CNL 11/23/81. 10080 - 10114' MD 10118 - 10128' MD 10134 - 10164' MD 10170 - 10188' MD 10204 - 10214' MD 10224 - 10242' MD 10340 - 10344' MD 10476 - 10498' MD 10530 - 10546' MD 10581 - 10599' MD 10606 - 10630' MD Pumped the following treatment: 2 bbls 15% HCl w/10% Xylene. POH and unplugged CT nozzle. RIH w/CT and resumed pumping as follows: 15 bbls 2% NH4Cl water, followed by, 50 bbls 15% HCl w/10% Xylene, followed by, 24 bbls 2% NH4Cl water, followed by, 65 bbls HEC polymer gel water (40 Ibs/Mgal), followed by, 71 bbls 2% NH4Cl water, followed by, 162 bbls 12%-3% HCl - HF, followed by, 164 bbls 2% NH4Cl water. Flushed acid away with Meth/Water, POH, and rigged down.. 9/6/88: A CTU Cement Squeeze was performed as follows: MIRU, and PT equipment to 4500 psi. RIH w/CT, and fluid packed wellbore w/seawater. Pumped 60 bbls Musol, followed by 84 bbls of diesel, followed by 90 bbls cement. Squeezed perforations at: 10037 - 10066' MD Ref. Log: CH CNL 11/23/81. 10080 10118 10134 10170 10204 10224 10340 10476 10530 10581 10606 - 10114' MD - 10128' MD - 10164' MD - 10188' MD - 10214' MD - 1O242' MD - 10344' MD - 10498' MD - 1O546' MD - 10599' MD - 10630' MD Contaminated cement with 175 bbls contaminant. POH. Rigged down. DS 14-13i DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE : INJECTION PROFILE MODIFICATION 9/7188: Cleaned out contaminated cement from wellbore. 10115/88: Performed a post squeeze Injection Profile. Injection Profile indicated that some squeezed perfs were leaking. 4/25/89: A post squeeze Sand Dump was performed to place sand across leaking zone 3 squeezed perforations, as follows: MIRU, and PT hardline to 2800 psi. RIH and pumped 120 bbls Sand Slurry (4200# 20/40 mesh, 525# 100 mesh, 525# Silica Flour), to cover leaking squeezed perfs. Displaced with 20 bbls MethANater. POH. Rigged down. 4~27/89: Post sand placement tag run made to 10185' SLM. 5/5/89: Post sand placement tag run made to 10194' SLM. 5/6/89: Fill cleanout was performed as follows: MIRU, and PT equipment to 4000 psi. RIH w/jetting nozzle to 10175' MD, and jetted: 10 bbls 15% HCL, followed by 24 bbls 1-1/4# XCD Gel, followed by 9 bbls 15% HCI, followed by 59 bbls 1-1/4# XCD Gel, followed by 131 bbls 1/2# XCD Slick Water. POOH. Rigged down. Took 457 bbls of returns. 5/8/89: Post fill cleanout bottom tag run made to 10254' MD. 5/27/89: Reperforated: 10037 - 10066' MD 10080 - 10114' MD 10118 - 10128' MD 10134 - 10164'~MD 10170 - 10188' MD 10204 - 10214' MD 10224 - 10242' MD Ref. Log: CH CNL 11/23/81. Made tag run, after shooting reperforations, to 10271' MD. Returned well to seawater injection and obtained a valid injection test. ARCO AI...A.?I(A, INC:., F:'., O, B 0 X ~ .;) (-) 3 6 (') ANCI-IOI:~A~E:', ALASKA "795~ ¢) / 3 I~F:'I'-"ERENCE' ARC[] CASED HOLE FINALS i -. t 9 4--t 4-.89 COL. LAR/F'ERF 3-7 6-7-.89 IN,JECTION F'ROFILE 3-t 2 6.-.t 2-89 F:'E:RF F;,'EC;L"JRD 4-3 4-t 4-89 COI..LAR/F'ERF 4 .... t S 6-.t t-89 COL. LAR/PERF 4'-2Q 6-2-89 INJEC"f ION PROFILE 5'-~ 2 6-'3'-89 PITS 5-~ ~ 4 -2(~'""89 COI..I..AR/PERF i2""5 6-4-89 GAS I..IF'I' SURVEY ~ 2-32 6-'J 4-89 COI..I..AR/PERF t4'-~3 6-'3-89 INJECTION PROFILE: t 4'-t4 6-3-89 INJEC'I"ION F'ROFII_E i5-4 6-4'"'89 LEAK DETECTION ~'.5-t5 6-t 7-89 C[)I..I..AR/F'ERF : ~ 6-7 4-28-'89 COL. LAR/PE:RF ~ 8-23 5-3i -89 P[l'~ F'I_EASE SIGN AND REI'URN THE A'1"I'ACFIE:D COF'Y AS RECEIF'I" OF RUN ~, !5" RUN RUN t , 5" RUNS t -3, RUN t, 5." I;:ON ~, 5 ' F;.'.UN t , .5'" F:UN Rt.JN i , .5" RUN i , 5" R LJ N RUN RUN i, t" R Lt N F;.'.UN t, 5" RUN I , 5" DA'FA, t-tLS CA~tCO $C1--I HI_$ A'FI_A$ CAMCO C A t.i C 0 HL.S C A t,I [; 0 A'I LAS C A t'i C 0 C A iff C I] C A N C 0 A I'LAS HLS CA~CO HAVE A NICE DAY! S'AL.t..Y HOF:,F:'ECKiiilF~: ~ JUN 2 8 ]~18,9 AP'I"~VFI) ,,J.~. Al'O-t 529 'I"RAN,S':~ 89263 Alaska Oil & Gas Cons. Commission Anchorage D I SI'RI Bu'r I ON · ' [.'.FNTRAL FILES "" F'H ILL I P,g 'Ir 'Ir . '"' CFIEVRON F:'B WELL F'ILES D & M R &'D ~' EXTENSION EXPLORATION 'Ir '"" EXXON '"' · - SI'AI'E OF ALASKA 1' '"' TEXACO MARATHON · '~ ... · .. MOBIL DATE ' 6-9-89 REFERENCE' ARCO CASED HOLE FINALS 3-9 5-22-89 PRODUCTION PROFILE RUN i, :3-24 5-22-89 GR SPEC .TOOL RUN . · -- j'~ ~1 J 3-2° 5-26 89 ~,R SPEC TOOL RUN i 4-t5 5-t7,i9-89 TEHF' I;:UN i, 4-26 5-i 9-89 PRODUCTION PROFILE RUN 4-3e 5-t 8-89 PRODUCTION PROFILE RUN 5-i3 5-2~,2i-89 [EHF' RUN i 5-i7 5-2~-89 PRODUCTION PROFILE RUN ~7-7A 5-28-E',9 F'ERF RECORD RUN 9-t4 5-22-89 INJECTION PROFILE RUN --i 2-i i 5-2i -89 F']] T~' RUN '~i2-t9 5-2i-89 INJECTION PROFILE RUN ~i 4-t3 5-27-89 COLLAR/PERF RUN i t 8-2~ 5-22-89 CBT RUN OWDW-NW 5-24,25-89 F']:T~' RUN t, OWDW-,S'E 5-25-89 F'IT~ RUN OWDW-~W 5-2~-89 F'IT2 RUN t, PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. ii 5' 5" 5' 5' 5' 5' 5' 5' 5' 5' 5' 5' CAMCO S'CH ,S'CH CAMCO CAMCO CAMCO CAMCO C A M C 0 ."_<: C I.-i CAi'4,.Z:O CA~C[) CAi'iCO A'F. LA~' ~'CH CAMCO CAMCO CAMCO CENTRAL FILES EXTEN£'IO~-~ EXPLORAI'I ON EXXON. MOBIL F'HILLIF'~' PB WELL FILE~' "'- BPX ~~ ~"I'A'¥E OF' ALA~'KA ~ TEXACO ARCO ALASKA, INC. F'.O. BOX i00368 ANCHORAGE, ALASKA DATE: REFERENCE: ARCO PRESSURE DATA i-i t 8-24-88 i-i 9 i 8-28-88 2-4 t 8-24-88 4-i? i8-i~-88.-- 4-3i . 9-2~-88 4-32 9-2i -88 5-i i t 8-t 9-88 5-i3 i O-i 9-88 5-i 5 t ~}-i 9-88 6-i 7 i 8-i 8-88 '7-2 i 8-9-88 7-8 i 8-,o-88 9-5 i 8-5-88 9-29 8--28-88 9-3:..~ 8-28-88 i2-3 i()-i 4-88 i2-6 i ~-i3-88 i 2-i (') i (-)-i 2-88 i2-2i i 8--i 9-88 i 3-i i i ()-6-88 i 3-26 i ~-6-88 iT~-28 i 8-6-88 i 4-i 0 7-i ~.)-88 i4-.i S 6-~8-88 i 4-i '7 t i 4-.i 8 i t'i:,-7-88 i 4-32 i 8-7-88 i 5-7 i 8-8-813 i 5-i 8 i 8-9-88 i 5-i 5 i 8-8-88 i 5-i 9 i 8-8-88 i '~'-29., · ,.i 8-i 7-88 i 5-25 i ~-28-88 i 6-7 i 0-22-88 F'WDW3-i i 8-t 3-88 BHF'--STATIC GRADIENT BHF'--STATIC GRADIEN'F BHP--STAI'IC GRADIENT BHP--F'RESSURE FALL-OFF BHP--STATIC GRADIENT BHP--STATiC GRADIENT BHP--STATIC GRADIENT BHP--STATIC GRADIENT BHP--STATIC GRADIENT BHP--STATIC GRADIENT BHP--STAI-IC GRADIENT BHP--$TATIC GRADIENT BHP'--FLOW!NG GRADIENT BHP--STATIC GRADIENT BHP--STAI'IC GRADIENT BHF ..... FLOWING GRADIENT BHP--FLOWING GRADIENT BHF .....FLOWING GRADIENT BHP .... STATIC GRADIENT BHP--STATIC GRADIENT BHF'--STAI'IC GRADIENT BHP--STATIC GRADIENT BHP--FLOWING GRADIENT BHF .... STATIC GRADIENT ~HF .... S l' A T l C BHF .... STATIC BHF .... STATIC BHF ...... STATIC BHF .... S'l'Al' IC BHF .... STATIC BHP--STATIC BHF .... STATIC GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT GRADIENT BHP.--STATIC GR. AD I ENI' BHF' .-.-FLOWING GRADIENT BHP--STATIC GRADIENT F't_FASE SIGN AND RETURN THE AI'TACHED COPY AS RECEIF'T OF' RECEIVED BY s A L L Y c Ka & rm, TRAN$ ~88642 AF'F'ROVE~__ D I S'F R I B U T I 0 N CENTRAL F ILF'S ~ i::'HIt._t...ZF'$ EXTENSION i.:.:XPL. ORA T l Oi'~ ~. ,S:AF'C EXXON ~ STATE OF AI_A;.,,'KA MARATHC}N ~ I'EXACO HOBIL CAMCO CAMCO CAMCO CAMCO OTIS OTIS CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO DATA ARCO ALASKA: INC~ P 0 BOX ~ ,":;n~ ~,;-~ ANCHC!R. AC~E , ALASKA REFERENC~E F:" L ['!: A S E $ i i -,S- 88 CNL-[;AMMA ,::) - '24 .- 8 (3 C C i.. i -:~--88 CNL--GAMMA i '-S-88 C N L-{;, Ai'ii'i A ;3--i 4-F38 F'RODUCTiON F:'ROFiLE i '- 5'--- 8 8 CNL-GAMMA i -5:'-88 C NI...-'(; A H.P~A ":"-,, i :3-8n,.-. I N. .... iEC'T l ON ,r'F;.'.n~:._.. I L.F' ,:Z:, .... i 2 -- 88 i N ..J E C: i" i 0 N F' F;,' 0 f" '.il i... El i --4-88 CN L'-(.i. ANi'qA i .... 2'-88 C:N L.--'-(;;A M M A 4 ..- 2 --- 8 8 ;" N L .-- il;.. A iq M A , :.... ~ -5: -' 88 "i" U B I N G C Lt T T E R. (:} - ~ 4 -" 88 P R 0 'C' U C T I 0 N F' R. 0 F I i_.. tE £' U R V [:' Y 6' - ~ ..3 "" 88 P R 0 D U C "I" ! 0 N P R U F' ! L E 6'- 3 ~ .... 88 C B '!" ..... - o o C E "i" ':!)-"5 ~ .... :iii:'8 C B T ,:.:) -'$ i "-" 88 C E T ':3' .... 25""88 CCi_-GAMMA (') -' 22 - 88 P R '3 P U C 'i" '.1: i-) N f" R U F' i[L ':':) .... ':2. :'J .... :!ii:iii: C C L GN AND RE:'T'URN THE ATTACi"IED COP:f' AS RECE:iF'"F RUN i, RUN i; I:,.' i_1N. i , ..., RUN i , 5" RUN i RUN i .. 5" RUN. i , -, RUN i , ':'.';' F;:I._iN i , _,"'":" RtJN i , 5 F;:U Ni , ..;-~':' RUN i, ~" R.L.INi , '~'.,." RUN i , 5" RUN i R l.j N !:;.:UN i , .5' RUN R. Lt N RUN R U N F..'tjN. i , 5 F,'UN i, I:(tJNi, 5" RI. JNi, 5 F;.'.UN. i , "-/.;:" F; i'LAS C A ri; C 0 A T'L A $ A'i'i_AS C A M C ti A'f'LA;~ ATLAS C A M C 0 C A M C 0 ATLAS ATLA;); A'i'L. AS ATLAS C A M C 0 CAMCO CAMCO CAMCO SCH SCH a. CFt SCH' C A M C 0 C A i'd C 0 CAMCO C A M C 0 i..iAVE A F.I]:CE DAYf SAi...L.Y !"IOF:'F-iECK F'R ,'"~ 'T' o .- i 5:"2 '7' & G~ , ~chom~;e T F.: A N ;!; ~ 8 8 ~; :-(:;,. ~ AF'PROVFD:'~.;~.; ......................................... D :[ $ 'f' R 1[ B U 'i- i [3 N f'.r"~, ..... ,,'. r.:' L. ES ~ ~,:.,4 i',.,--,L. : I .ii: C H E ".-" t'i' 0 N D & f"i :'~ E X'f' ii:.. N ::'.': :[ 0 N :" "'"" . . t.:. ,,.. ,'- L 0 F< A r Z 0 N E 'x' Y 0 N . · . H A R A T H 0 N · '"-,,. M 0 }):. t L. · i~ P H :1: I... L. I F' $ F'£4 WELl_ F' :!: !_ F: ;:':.,' F,' & D :,",:S A F:' C :~: S T A T E 0 i::' A i... ~':':~ ;? i-:.'..,'::'~ ~ T E X A C 0 ARCO ALASKA, INC. P.O. BOX te0360 ANCHORAGE, ALASKA 995t0 DATE:. 9-23-88 REFERENCE : ARCO CA£ED HOLE FINAL ~"2-i A 8-t (~-88 ~"COLLAR/F'ERF RUN i, 5 · ,. ~.3 8-28-88 COLLAR/F'ERF RUN t 5 ~3-i t 8-27-88 SF'INNER/TEMF' RUNS i &2, ~4-4 8-t2-88 COI_LAR/F'ERF RtJN i, 5' *~--8 8-5-.88 COLLAR/"F'EF.'F RUNS i 6,2, ~:44 9-i6-88 VERTILOG RUb, i, 5' 9-i6-88 COLI. AR/F'ERF RUN i , _~;~-i 2 9-1 5.-88 COLLAR/F'ERF' F:tJN 3, 5" -5 . 9-t 8-88 COLLAR/F'ERF RUN 2, '~t i-i 9-i 7-88 COLLAR/F'ERF RtJN 2, 5' '~c'i i -i 2 9-i 7-88 COLLAR/F'ERF' RUN t , 5 · ""4 4-i t 9-4-88 COLLAR/F'ERF RUNS t -;3, ~i 4-t 3 8";3i -88 r" ', , ', "',- , , ..,OLLAR/FEF, F RUN t ~ 5-1 4 8-8-88 COLLAR/F'ERF RUN t , 5' ~'i5-25 9-i6-88 CBT RUN i, 5' ~'"'4t5-25 9-i6-88 CET RtJN i, 5' 6-'7 8-6'"88 COLLAR/F'ERF' F(UNS i -8, PLEASE SIGN AND REI'UI'~N I'HE ATTACHED COF'Y AS RECEIF'T OF DATA. RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-t52~ TRANS ~88582 ~ APF'ROV E ~ DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXF'LORA'FION EXXON HARATI~ON MOBIL. PHILLIPS PB WELL FILES R & D SAPC STATE OF' ALASKA .TEXACO I _5" 5" 5' GEAR GEAR OTIS GEAR GEAR ATLAS ATLAS ATLAS Al'LAS Al'LAS ATLAS GEAR GEAR GEAR $CH $Ci4 GEAR ARCO ALASKA, INC. P.O. BOX t80368 ANCHORAGE, ALASKA DATE: 9-~6-88 REFERENCE 2-7 9-i 2-88 ~ J-9 8-27-88 4-2 ?- t 2-88 % 4-4 8-~ 8-88 ~6-9 9-~ t-88 ~ 6-i 2 9-8-88 "~7-4 ?-i ~)-88 m~, 7-4 9-t 0-88  i 4-i 3 8-20-88 i 5-t 8A 9-5-88 "~ i 6-4 8-i 8-88 ~ t 8-9 8- t 9-88  WDW-$W 8-24-88 OWDW-£E 8-25-88 PLEASE : ARCO CASED HOLE FINAL COLLAR/PERF PRODUCTION PROFILE CET PRODUCTION PROFILE COLLAR/PERF PRODUCTION PROFILE COLLAR COLLAR/PERF TEMP SURYEY CBT PITS--GAMMA RAY PITS--GAMMA RAY PIT£ PITS SIGN AND RETURN I'HE ATTACHED COPY AS RECEIPT OF A ]' O- t 5:29 : ' Anchorage TRAN$ ~8857i APPROVED_ DISTRIBUTION RUN t, RUN t, RUN i, RUN ~, RUN i, RUN t, RUN i, RUN t, RUN i, RUN t, RUN i, RUN i, RUN i, RUN t, DATA. 1 5" 5" 5" 5" 5' 5" 5" 5" 5" 2'&5" 5" 5" 5" ATLAS CAMCO $CH CAMCO ATLAS $CH ATLAS ATLAS CAMCO $CH CAMCO CAMCO CAMCO CAMCO CENTRAL FILES ~ ~ F'HILLIF'$ CHEVRON F'B WELL FILES D & M R & D EXTENSION EXPLORATION ~ ~ SAPC EXXON ~ STATE OF ALASKA MARATHON ~ ~ TEXACO MOBIL ARC(] ALA..~KA: TNC, ( P., 0., Rf.lX i ¢O.'4,4(~ ANCHOR'AGE: AI..ASKA o°~t,,. (..~. DFFERFNCF' ARCO CA~FD HnI.F FTWAI. 5-'t 7 ,..A. -t 9 7-{ 4-RR ~ 4-~ t3 ?-'t 'i 4-~ ~ · I/-,-,4,. '7-'t ! -RR F'RRDIlCTTrlN F'F,.'nFTI..F' RIIN ~ .... .., : . TFHPI--F-,,'~TllE'E/I FAR' I'~FTFD. TTI"IN E'llKI 'i: I.EC~K T'I'I/TEMF'Er4'ATIIR'F/i-:.D.! R'tlN 4. FI,. nWHFTFF,,' R'! IN 'i . ':,'; · TN.!F'RT'[nH F'RnFI'I F R'llN 4: ., DATe, FF-,.'¢,C/TF..PiPFF,.'ATI.IF,.'F ~IIE'VEY I;.'lli"J 't: !:',! FA~E .~TF, N Aisle4 THF ATTA, F.'.HF:'D F':OPY A,? I:;.'.F.F':.FTPT nF RECE T.~_~. .... HAVE ~[-.'. DAY! F'FF..;f;Y A'I'O- t ..%.'29 'rF~.N.q' :,";RR49;'.,~t'~ .j i ~ f / ./b"% ,, , , h T,'..r'.. T E' ][ RI ! T T R N CAM£O CAHnn CHEVRnN T) ,~. M ~. I:EY,'T F~N ~ T F1N · ~- .. M r2,1E' r~ Ti-i n N ~'¢ Mr'IR T. I... EXI- .~ flR'¢:~T T F1N '"- Oil & Gas Cons. Commission ; Anchorage f'.., t' ."-;: T 1:;: T R ! !T T f'i i"-J " i": ~-~.~ H.£: t'i .f': ¢, H f": f'", RAHf".f'i f": ¢, H r'.' f': A H f". Fi F': ¢'., H r": f"l f": A H f".' Fi f-:A Hf":f~ r':d, MF:Fi f".' ,'-", H R f'i F': ¢..', H F'.' FI f-: A M F': f"i f": A H f": Fi f-: A i'.-i F: f'i F: A Pi F: Fl ARCO Alaska, Inc.flL~ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 27, 1988 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 14-13 Approval Number: 8-429 Enclosed is the Completion Report and Report of Sundry Well Operations detailing work completed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/SAD/sd Enclosures cc: Standard Alaska Production Company J. Gruber, ATO 1478 File: PI(DS14-13)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-(~ STATE OF ALASKA ' ALASK IL AND GAS CONSERVATION ,vIMISSION "WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE I~[ W~ter ]'nject-[on /' , 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99.510 50- 029-2062/+ 4. Location of well at surface 9. Unit or Lease Name 1/+02'FNL, 1019'FEL, Sec. 9, T10N, R1/+E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 271'FNL, 2530'FEL, Sec. 10, TiON, R1/+E, UM 1/+-13 __ At Total Depth 11. Field and Pool 183'FNL, 2238'FEL, Sec. 10, TION, R1/+E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Design. etlon and Serial No. Prudhoe Bay Oil Pool 71' RKBI ADL 28312 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 10/26/81 11/13/81 11/19/81I N/A feet USEI 1 __ 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10765'MD, 9/+05'TVD 10682'MD, 9328'TVD YES~ NO []I 2202' feet MD 1800' (Approx.~ _ 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, GR/IEL; DENSITY/CNL/GR/CBL/GR _ 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH'MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 9/+# H-/+0 Surf. 80' ~9.,, ~O~3 .~x pe_~,afre_,t 13-3/8" 72# L-80 Surf. 2581' 17~" 3oi3o mw AR TTT ~, /.{3t3 ew AR TT 9-5/8" /+7# L-80 & Surf. 9900' '[9~" ~,~0 ~c C1~.~ C. n_mt S00-95 7" 29# L-80 9619' 10762' 8~" 350 .~x C],.~.~ C~ 24. Perforations open to Production (MD+IVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) *10037-10066 *added on 11/22/8/+ 10/+76-10498 5% q&/'/" e576' 10080-1011/+ 10530-105/+6 10118-10128 10581-10599 26. ACID, FRACTURE, CEMENT SQUEEZE, ETCi 1013/+-1016/+ 10606-10630 DEPTH INTERVAL (MO) AMOUNT & KIND OF MATERIAL USED 10170-10188 ~/~ 1020/+-1021/+ 1022/+-102/+2 w//+ spf Ref: CNL 11/23/81 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) Water In~ecttonI N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO N/A TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OI L-BBL GAS-MCF WATER-BBL OIL GRAVITY2API (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. . Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Top Sadlerochit Base Sadlerochit MEAS. DEPTH 10037' 10656' TRUE VERT. DEPTH 8746' 9304' GOR, and time of each phase. N/A 3~olnl~T OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to .the best of my knowledge Signed . __ Title Opr. Engr. Mgr. Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, amd in item 24 show the producing intervals for only the interval reported i~n item 27. 'Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM -~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 3. Address Post Office Box 100360, Anchorage: AK 99.51(3 4. Location of well at surface 1402'FNL, 1019'FEL, Sec. 9, T10N, R14E, UM At top of productive interval 271'FNL, 2530'FEL, Sec. 10, T10N, R14E, UM At effective depth 193'FNL, 2271'FEL, Sec. 10, T10N, R14E, UM At total depth 183'FNL~ 2238'FEL, Sec, 10, TION: R14~= ~M 11. Present well condition summary Total depth: measured 10765 feet true vertical 9405 feet Effective depth: measured 10682 feet true vertical 9328 feet 5. Datum elevation (DF or KB) '/1 ' DVD 6. Unit or Property name Feet Prudhoe Bay Unit 7. Well number DS 14-13 8. Approval number 8-429 9. APl number 5O-- 029-20624 10. Pool Prudhoe Bay 0il Pool Plugs (measured) Junk (measured) Casing Length Size Conductor 80' 20" Surface 2581' 13-3/8" Cemented 300 SX 3000 + 400 SX Measured depth 80' 2581' True Vertical depth 80' 2580.9' .Producti on 9900' Liner 1143' 9-5/8" 500 Sx 'G' 7" 350 Sx 'G' 9900' 10762' 8625.74' 9402.4' Perforation depth: measured true vertical 10037-10066' 10170-10188' 10530-10546' 8746-9280' , 10080-10114' , 10204-10214' , 10581-10599' Tubing (size, grade and measured depth) 5½"; 17#, L-80 PCT, 4½", 12.6#, N-80 @ 9644'MD Packers and SSSV (type and measured depth) Baker Packer @ 9571'MD; £amcn Ral-O ~$$V _(a _~!96'MD 12. Stimulation or cement squeeze summary Intervals treated (measu red) N/A Treatment description including volumes used and final pressure , 10118-10128' , 10224-10242' , 10606-10630' , 10134-10164', , 10476-10498', 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data HA OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge J~...~. ~<'--~.~?,.'7.- ~ Signed 2~"~~/~ Title Operations Engineering Manager Form 10-404 Rev. 12-1-85 14-13/STAT17 Sharon K. Allsup-Drake (263-4244) Date ~¢~'~' Submit in Duplicate Began perforating operation on 6/11/88. RU perforating unit and pressure tested equipment. RIH w/gun # #1, shot interval 10610-10630'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH with gun #2, shot interval 10581-10599'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH w/gun #3A and Gun #3B, shot interval 10606-10610'MD (4 spf) and shot interval 10530-10546'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH w/gun #4, shot interval 10476-10498'MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. Secured well. R.D. Ref: CNL 11/23/81 STAT17:SN 4-29 !-41-1t-I:: F'I'NAI f':.N ! f":,711 t. AK'/P,r-:'F,:F~qR'~T T FIN PI F-¢~y.:F' ~'rl",.N t.'.-,NT:, R'F'TII!:.:i'-4 'TI-IF ~,T'T¢~f't. NF'T'., F:f'iPY ¢-,:'7 R: I:' f":. F 'I' !:' T flF T'.~¢-,'F¢,. ¢,T! ,,'~ R' _.':...-' 1171-4 ~'TI ;.~ :.:.' ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager May 27, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 14-13 Permit No. 81-101 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/SKD/jp At tachment cc: Standard Alaska Production Company J Gruber, AT0-1478 r~v [~[ P1 (DS 14-13)W1-3 WELLS2/165 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM ~ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate I~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM At effective depth 188' FNL, 2256' FEL, Sec. 10, T10N, R14E, UM At total depth 183' FNL, 2238' FEL, Sec. 10, T10N, R14E, UM 11. Present well condition summary Total depth: measured 10765 feet true vertical 9405 feet Plugs (measured) 5. Datum elevation (DF or KB) 71' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 14-13 8. Permit number 81-101 9. APl number 50-- 029-206Z4 10. Pool ?rudhoe Bay O±1 ?ool Effective depth: measured 10721 feet true vertical 9364 feet Casing Length Size Structural Conductor 80 ' 20" Surface 2581 ' 13-3/8" Intermediate Production 9900' 9-5 / 8" Liner 1143' 7" Perforation depth: measured Junk (measured) Cemented Measured depth True Vertical depth 300 Sx 80' 80' 3000 + 400 Sx 2581' 2580.9' 500 Sx 'G' 9900' 8625.74' 350 Sx 'G' 10762' 9402.4' true vertical 8746-8928' (7 intervals) Tubing(size, grade and measured depth) 5~", 17#, L-80 PCT, 4~", 12.6#, N-80 @ 9644' MD Packers and SSSV(tvpe and measured depth) Baker Packer @ 9~?1' MD; Camco Bal-0 sSsv @ 2196' MD 10037-10066', 10080-10114', 10118-10128', 10134-10164', 10170-10188' , 10204-10214' 10224-10242' 12.Att ac h me nts Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation Subsemtent Worlc Bennr~,~l nnJune 1988 14. If proposal was verbally approved l~orl:aNO./¢_ Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~j~//O,.~,~3~l~/,~'/~ Title Operations Engineering Manager Commission Use Only Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI Approved Copy Returned ORIGINAL SIGNED BY ~-/_ ~ ~ ~ LONNIE C, SMITH Commissioner WELLS2/165 S. K. Allsup-Drake, 263-4244 by order of the commission Date ~',--/~ ~/,f~ Submit in triplicate DS 14-13 PROPOSED PERFORATIONS ARCO Alaska, Inc. proposes to add perforations within the Sadlerochit interval in well 14-13. The proposed perforations will be performed before the planned CTU squeeze and the intervals are as follows: Existing Perforations Proposed Add Perforations 10037-10066' (29') MD 10080-10114' (34') MD 10118-10128' (10') MD 10134-10164' (30') MD 10170-10188' (18') MD 10204-10214' (10') MD 10224-10242' (18') MD 10476-10498' (22') MD 10530-10546' (16') MD 10581-10599' (18') MD 10606-10630' (24') MD Ref: CNL of 11/23/81 A 5000 psi WP wireline lubricator and BOP, tested to 4000 psi working pressure prior to the job, will be utilized for this operation. WELLS2/165 3 mm' 2 '1' 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) 5. 5000 PSI 4. 1/6" LUBRICATOR 4. 5000 PSI 4. 1/6" FLOW TUBE PACK-OFF WIRELINE BOP EQUIPMENT REV .' Prudhoe Bay gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 13, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission ~/~.~ 3001 Porcupine Drive Anchorage, Alaska 99501 ' Re: DS 14-13 Permit No. 81-101 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/TAB/jp At ta chment cc: Standard Alaska Production Company Pi(DS 14-13)W1-3 APR ! Oil & Gas Cons. A,,i, chorage WELLS/~0c% Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend . * Operation Shutdown . ~ Re-enter suspended well ~ Alter casing Time extension Change approved program Plugging *~. Stimulate .'~ Pull tubing Amend order .r Perforate 2 Name of Operator ARCO Alas~, Inc. 3 Address P.O. Box 100960, AnchoraAe, AK 99510 4. Location of well at surface 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 5. Datum elevation (DF or KB) 71' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 14-13 8. Permit number feet 271' FNL, 2530' FEL, Sec. At effective depth At total depth 183' FNL. 2238' FEL. Sec. 11. Present well condition summary Total depth: measured true vertical 10, TiON, R14E, UM 10. TION~ R14E. UM 10765 feet 9405 feet Plugs (measured) Effective depth: measured 10721 feet Junk (measured) true vertical feet 9364 Casing Length Size Cemented Structural Conductor 80 ' 20" 300 Sx Surface 2581' 13-3/8" 3000 + 400 Sx Intermediate Production 9900' 9-5/8" 500 Sx 'G' Liner 1143' 7" 350 Sx 'G' 81-101 9. APInumber 50-- 029-20624 10. Pool Prudhoe Bay Oil Pool Perforation depth: measured true vertical 8745.8-8927.7' (7 intervals) Tubing (size, grade and measured depth) ~" 1 L /'~" ' 52, 7#, -80 PCT, , 12.6#, N-80 @ 9644 MD Packers and SSSV (type ~'r~ measured depth) Baker Packer @ 9571' MD; Camco Bal-0 SSSV @ 2196' MD Measured depth True Vertical depth 80' 80' 2581' 2580.9' 9900' 8625.74' 10762' 9402.4' 10037-10066', 10080-10114', 10170-10188', 10204-10214', 10118-10128', 10134-10164', Gas Cons. Commiss!o; Anchorage 12.Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch ~., 13. Estimated date for commencing operation 14. If proposal was verbally approved Name of approver June 1~88 Date approved 15. I hereby 9~rtify that the fore_going is true and correct to the best of my knowledge Signed ~~j~~?~'~_,,~,,..~' Title .Oner~tinn~ gn~n. eer~n~ M~na~er Date Commission Use Only Conditions of approval Approved by Notify commission so representative may witness i Approval No. ~ Plug integrity ~ BOP Test ~ Location clearanceI ~-')"- c=2 ~ ¢ %~pproved Copy Returned ORIGINAL SIGNED BY .'~ '~/_~'--~?~. by order of L01~I{bE C. SMITH Commissioner the commission Date'S7/-/,.~ ~_~ Form 10-403 Rev 124-85 WELLS/105 T. A. Billingsley, 265-6871 Submit in triplicate DS 14-13 CTU SQUEEZE PRELIMINARY PROCEDURE · me · Shoot squeeze perforations: Ref: CNL 11/23/81. 10340-10344', 4 SPF, Zone 3 Acid wash existing perforations. Pump cement through coiled tubing, squeezing existing perforations. Zone 10037-10066' 4 spf 4 10080-10114' 8 spf 4 10118-10128' 8 spf 4 10134-10164' 8 spf 4 10170-10188' 4 spf 4 10204-10214' 4 spf 4 10224-10242' 4 spf 4 4. Pressure up on squeeze and hold for 1 hour. · e · Me Ref: CNL 11/23/81 · Contaminate cement in wellbore. Leave well shut-in overnight. Jet out contaminated cement. Leave well shut-in. After at least 2 weeks, test for injectivity. Reperforate: Ref: CNL 11/23/81 Zone 10037-10066 ' 4 spf 4 10080-10114' 4 spf 4 10118-10128' 4 spf 4 10134-10164 ' 4 spf 4 10170-10188' 4 spf 4 10204-10214' 4 spf 4 10224-10242 ' 4 spf 4 Return well to injection. 14-13 current status: Sea water injector Expected static bottomhole pressure: 3750 psi at 8800' SS Expected fluid in hole prior to perforating: sea water RECEIVED Gas Cons. Commission; Anchorage WELLS/105 6 5 4 2 1. 5000 PSI 7" W£LLHF. AD CONNECTOR FLANGE 2. 5000 PS1 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAUL lC SLIPS 4. 5000 PSi 4 1/6" $H£AR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" $TUIrIrING BOX RECE~/ED~ Oil & Gas Cons. Comm[ss[o:~: Anchorage COILED TUBING UNIT -' i I I I I II BOP EOU! PHENT 1. ~>000 P,~I 9" W£LLHEAD CONN[CIOR rLANG[ 2. ~000 PSI WIR[LIN[ RAUS (VAR~BL[ SlZ[) 3. ~OOO PS~ 4 1/6" LUBR~TOR 4. 5000 PSI 4 1/6" FL~ TUB[ PACK-Orr 2 Oil & Gas Cons. Commissic~ Anchorage NIREL]NE B~ EOUIPHENT ARCO Alaska, Inc~f~'' Prudhoe B~i¥ '~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 16, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Co~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 14-13 Permit No. 81-101 Dear Mr. Chatterton: Attached is the Application for Sundry performed on the above-referenced well. Very truly yours, DFS/TAB/jp Attachment cc: Standard Alaska Production Company PI(DS 14-13)W1-3 Approval detailing work to be WELLS / [~c5o Alaska, Inc. isa Subsidiary o! AtlanticRichfieldCompany STATE OF ALASKA ~ ALA .A OIL AND GAS CONSERVATION CO ,.,,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing¢ Amend order [] Perforate [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchora~e~ AK 99510 4. Location of well at surface 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM At effective depth At total depth 183' FNL, 2238' FEL, Sec. 10, T10N, R14E~ UM 11. Present well condition summary Total depth: measured true vertical 10765 feet 9405 feet Plugs (measured) 5. Datum elevation (DF or KB) 71 ' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 14-13 8. Permit number 81-101 9. APInumber 50-- 029-20624 10. Pool Prudhoe Bay Oil Pool Effective depth: measured true vertical Casing Length Structural Conductor 80 ' Surface 2581 ' Intermediate Production 9900 ' 1143' Liner Perforation depth: measured 10721 feet 9364 feet Size 20" 13-3/8" 9-5/8" 7" Junk (measured) Cemented 300 Sx 3000 + 400 Sx 500 Sx 'G' 350 Sx 'G' 10037-10242' (7 intervals) true vertical 8745.8-8927.7' (7 intervals) Tubing (size, grade and measured depth) 5½", 17#, L-80 PCT, 4½", 12.6#, N-80 @ 9644' MD Packers and SSSV (type and measured depth) Baker Packer 0 9571' MD-' Camco Bal-~ SSSV fa ~196' MD 12.Attachments Measured depth 80' 2581' 9900' 10762' ~ue Verticaldepth 80' 1580.0' 8625.74' 9402.4' Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation July 1987 14. If proposal was verbally approved Name of approver Date approved Signed Commission Use Only Conditions of approval Approved by Notify commission so representative may witness [] Plug integrity [] BOP Test ~e~hanic~t integrity _Tes~ [] Location clearance · Commissioner [Approval No. '7 -~ 3 ~2 by order of the commission Date Form 10-403 Rev 124-85 WELLS/105 T. A. Billingsley, 265-6871 Submit in triplicate DS 14-13 CTU PACKER INSTALLATION PROFILE MODIFICATION PROCEDURE AFE #699047 1. RU slickline. Pull SSSV. Run gauge ring to PBTD. 2. RU CTU. RIH with inflatable packer. Set packer in blank interval from 10188-10204' (casing collar at 10195'). Minimum restriction is a DB-6 nipple (3.813" ID) at 9642' MD. Packer can be set by either: a. tying in the TTL (TT at 9644' as per CNL 11/23/81) or b. CTU E-line. 3. POH with CT. 4. Resume injection. Monitor for decrease in injectivity because of packer. 5. If necessary, run spinner to confirm packer seal. 6. After confirming packer seal, size orifice to replace plug in packer. WELLS/105 ,'-, ;:" ;'" c' r, "-N ;-' E ' r', ,.:. ,-- ,:. :',. 1::...P., F;.' C: C! C.". a :~: e d H o L e F' i ~"~ a L t.....:.:t iff C ,':':',",'."' (:) ..... i 4 2':i;' F:' .... · ,- .7. f"i' ~ Alaska 0il & Gas Cons Commissior~ ',"'" .L ;.:';: 'i" B: .~. B U 'i" ...~ r~. , Anchorage I' ARCa Aia.ka. inc. ~ Post Office Bol 100360 ( Anchorage. Alaska 995'0 Telephone 907 276 '2'5 Date: June 26, 1985 Reference: ARCO CH Finals , . ' 1-13 vtual Spaced Neutron I-IV Epilog 3-9 ¿/ Epilog c/ 6-14 Dual Spaced Neutron 6-24 V'" Epilog 7 -2 6 ~pilog 9-21 ../ Spinner 9-25 JSpinner 14-13 ~pinner 15-1) Epilog 16-1V Temperature Log L¡gn as receipt Reeei ved by Pam Lambert A TO 1429C Trans 180 5-17-85 5-17-85 5-15-85 5-10-85 5-18-85 5-16-85 6-19-85 6-19-85 6-10-85 5-16-85 6-8-85 of data. "Þ 1\ , Run 1 5" Welex 1 5" DA 1 5" DA 1 5" Welex 1 5" DA 1 5" DA 1 5" Cameo 1 5" Cameo 1 5" Cameo 1 5" DA 1 5" Cameo ,t!þ~ ,»)þC,~íW, '-~~--t_/ / ~ , JU!~ £::' " '~rl/'L"y"" , '. I .¡....,. ,,¡ iChêvron, r D & M Expr~: Service's ~ , ' - Ext., Exp lor.ation ,1' . Exxon' , . Marathon Hø'b Ï"l ' Alaska, Oil' . t. , . " 6" uu.:> Cons. CommISSion , ,AnchoraGe ;;;J ~ P'tii:il'ips \ PB Well Files R & .D Sëtii 0 . Ståte~.of Alaska;:" Texaco..:. ' , , ~~ ~~ 't. ARCO Ala~.ka F'. O, Box A~chorage, DATE' December '~i i°°'~ REFEF.,'ENCE' F~l-,,..d Ca~ed Hole F ina D ~" ' '"'" -- ':- : 6 -' E; ' "-' d . ,.:. 'I -t A o '. · ,..:, .... -'.', CCL,,-F-~'~" t"' Recor D S 3'-4 i t ~ o..~ ' 'f 'T' _. - - -, -,;.,'.'~ D i I"' e m p L. r', g D,£', 3-tt ii-S--84 CF::i;/Spir~'ner D $ .S-m8~,'" tt-f° '-' · ...... ,.;-o'I CN/i'"i .'..'~' ./G F..' D,..".,', 4-3; ~ I i i 7-.84 CN/HS'/E,R D, S, 5-4 ~/ t I -i "I--84 CN/MS/GR D, £..', 7--4 --"- 8-3,":,:,-84 CCL./Per 'f Rec c,r d D :.,' 7- 4 -' c, ,--,,.-, , . ...,--....;. ;:.---84 C:ET Log , , '--, ...,A_.-/ ...... ;. ,...,~., / ·., D .;"!,: ,.'-.; f 'i --I o-84 CN,. rt.,.., [,.'R D $ 7 i0'~''' ii i'=-.84 f''' '' l / ''~ ':'' ''' r" ''' , · -- - ..., ._.tx., t,~.... _ D, ~' .... ~'"x' ' t ,..:,'"c,~- [';N/HS/[:,R ,.,, ;-l 4 I i'" '" ""/' D, S, i 2 2,.:,':"'"'"t i -,'30-84 Per fora t' i ng F:ecord D., S , i S--2A .~'~' i ,.,-;;;-- ,...,c'-' -- ":>,.., ,,~'" CF"L.., .. ,." r':' e r, .... f t:~'. ~';, c: or d i4~tS~' ii-22--.8;q- Cc, ILar/F'erf Log D '~', i4 156',/' ,..., ,.:..., ,...,. CCL/Perf F,'ecc, rd D.Z..' I 5-.7" 9- i ,:'.-'.,-~4 CET I), Z ,i _,="--',"o_,, '~ ,;")--84 r':BL/v D_ ' ' D, S ,. i 7-6, ''/' t t ---2-84- CFS.:/.S'p i r~'ne',- ,_,,'r), ,..:."' , .~, 7-8-~"'"~' I f ._ z: - .c, ,,.., ..., . CF'£//,.-:."" r.:' i 'ri'ncr " SC h ii f'- "I)A DA DA Z:; c: h ,? c h I) A DA DA ,'.'; c h a. £: h ....' . .. S c h ,? c h · '.. c: h sign and 're't'urr~ 't:he a,'!:'t'ached copy as-..- receip-i: ,,,'ecl I:.4 "..,' HAVE A FIAF'F'Y HOL. IDAY ,?EA$ON! Ke L L':.,,' Mc:F:'ar La'nd A T 0- i 4 '29 F Alaska Oil & Gas Corm. Commission Anchorage, o 't:' d a i' a .~ Chevr'o'n I) & H Exp t. orai' i c','n Service.s:. E x ~,: e n '-:.- ~: i on E x r.:, 1. o r a t' i o'n E x x c,r., Qe!'ty Mc)bi L ;'""i c:, b i I. E: F:'hi 1. 1. il::' :.:: i::: l" u. cl h o c.-:, R & D ,S: c:, h i c, :'i: 't'a 't'e ,:::, ','" "':" i4el I. ..'..,a'? . . . A L a :::i< a i i J. e2' STATE OF ALASKA ALASKA"~"_ AND GAS C AISSION CONSERVATION ~0( SUNDRY NOTICES AND REPORT ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address P.O. Box 100360, Anchorage, Alaska 99510 4. Location of Well (Su~faC~) 1402' FNL, 1019'FEL, Sec. 9, T10N, R14E, UM (Producing Interval) 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM (Total Depth) 183' FNL, 2238' FEL, Sec. 10, T10N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 71' RKB I 6. Lease Designation and Serial No. ADL 28312 12. 8. APl Number 50- 029-20624 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [~ Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Cpmpleted Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation on 11/22/84. RU perforating unit and pressure tested surface, equipment. RIH w/gun #1, shot interval 10,144-].0,164' MD (4SPF). Shut-in well, POOH, all shots fired. RIH w/gun #2, shot select fire interval 10,134- 10,144' MD (4SPF), pulled up, shot select fire interval 10,118-10,128' MD (4 SPF). Shut-in well, POOH, all shots fired. RIH w/gun #3, shot interval 10,094'-10,].14' MD (4SPF). Shut-in well, POOH, all shots fired. RIH w/gun #4, shot interval 10,080-10,094' MD (4 SPF). Shut-in well, POOH, all shots fired. RIH w/gun #5, shot interval 10,046-10,066' MD (4 SPF). Shut-in well, POOH, all shots fired. RIH w/gun #6, shot interval 10,037-10,046' MD (4 SPF). Shut-in well, POOH, all shots fired. Secured well, RD. REF: CNL 11/23/81 RECEIVED DEC 2. 4 Alaska .Oil & Gas Cons. Col]l~issiorl Anchorage 14. '1 hereby certify that the foregoing is true and correct to the best of my knowledge. Signed .~..~~ ~. ,/~'~'~_,~../¢_. Title Regional Engineer The space below for Commission use Date Conditions of APproval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc.#~ Prudhoe BayEngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer December 21, 1984 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 13-2A Permit No. 83-21 DS 14-13 Permit No. 81-101 Attached are Well Completions for above-mentioned wells. Very truly yours, D. F. Scheve DFS/JEB/mjb Attachments CC: Sohio Alaska Petroleum Company File P1 (DS 13-2A) W4-3 File Pi(DS 14-13)W4-3 work completed on the £C£1v£D Oil ,~ Oas Co~o AnChorafle°' Commission ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany · STATE OF ALASKA od® WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [~ ~ELr~ In~~ 2. Name of Operator 7. Permit Number ~ ~, Inc. 81-101 3. Address 8. APl Number P.O. ~ 100360, ~, ~ 99510 50- 029-20624 4. Location of well at surface 9. Unit or Lease Name 1402' FNL, 1019' F~L, Sec. 9, Ti(]N, PJ.4E, UN ~ Bay_ [~Lit At Top Producing Interval 10. Well Number 271' ~/~L, 2530' F~L, SDc. 10, Ti(/~, R14E, UN D,S, 14-13 At Total Depth 1 1. Field and Pool 183' FNL, 2238' F~L, Sec. 10, T10N, R14E, UN ~ Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ~ ]~ ~ 71' lqKBI ~ 28312 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 1'16. No. of Completions 10/26/81 11/13/81 11/19/81,I N/A feet MSLI 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10765'FD,9405'T~D 10721'FD,9364'TtD YES ~ NO []I 2202' feet MD 1800' 22. Type Electric or Other Logs Run DIL/SP~/ER. (;R/m., r3~'W~./CN~J(~R, cRr:/c~ 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED lq--q/R" : 79~ T,-RR ~w-I:_ 9¢~ql' 17~' 3~lh ~r Ac: TTT ~ ~ ~r Z ~ TT Q-~/R" ,17,~ T,A::~ ~, ~Tr'F clq(~' 19Z~.' ~ ~z C¢!~ ~ r~nF 7"' 20~ T~R{3 o~19' 1137R2' R~J' qr-,D ~ Cla.g,:: C. cml-_ 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) *10037-10066 *a:t:]~ (::n 11/22/84 5~ 96~_4' 9576' 10118-10128 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10134--10164 ~ of ~:8~O-'89~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10170-10188 N/A 10204-10214 10224-10242 w/4 SPF REF: QqL 11-23-81 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) ~ In-' ¢L-e._i .Ch N/A. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I'GAS-OIL RATIO N./~ TEST PERIOD I Flow Tubing Casing Pressure CALCULATED=1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl, (corr) Press. 24-HOUR RATE ~ 28. COP E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core ch~. ' '%y, ,, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ..... '. :. : J~gluoe mtervai tested, pressure data, all flu~cis recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. .., Top Sa~ ~t 10037 8746 Base S~t 10656 9304 31. L~ST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .... Title ]~rl"~" C7%~] ]~1~" ~ Date / .~../27. / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal; water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well. is completed for separate production from more than one interval (multiple completion),~.~o state in item 16, and in,item 24 show the producing inter~als for only the interval rep. orted in item 27. Submit a separate form fC;'~ each additional interval to be separately produced, showii~g the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, In(r Post Office ~ox 360 Anchorage, Alaska 99510 July 14, 1983 Reference: Arco Cased Hole Finals D. S. 1-21 D.S. 2-12~- D.S. 5-12"- D.S. 6-19 D. S . 6-22f' D. S. 7-22 D.S. ll-4~- D.S. 13-6/'.' 7-2-83 5-11-83 5-12-83 6-30-83 7-2-83 3-18-83 5-27-83 5-13-83 5-13-83 5-19-83 5-20-83 5-21-83 6-17-83 5-21-83 6-13-83 D.S. D.S. D.S. D.S. 1 D.S. 1 D.S 1 D.S. 1 D.S. 1 ~se 13-6 /' 13-20 3- 26 3-27.~ 4-13~. 4 22 8-1'--" 5-18-83 sign and return Spinner CH CNL CH CNL Spinner Spinner GR EPL Hydrostatic Pressure and Gradients EPL Temperature Survey Temperature Survey EPL Collar Log Temperature Survey Diff Temp Log EPL the attached copy as 5" Camco Run 2 5" Sch Run 9 5" Sch Run 1 5" Oti.< Run 1 5" Oti.< Run 1 2" & '5' Run 1 5" Sch Survey, Drawdown Run 1 Sch Run 1 5" Sch Run 1 5" Cam( Run 1 5" Cam( Run 1 5" Sch Run 1 5" GO Run 1 5" Cam( Run 1 5" GO Run 1 5" Sch receipt of data. Kelly McFarland ATO-1429D Trans. ~ 421 Chevron D & M Dallas Drilling Exxon Getty Marathon Mobil DISTRIBUTION North Geology Phillips -. Caroling Smith State of Alaska ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 29, 1983 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re' DS 13-6 DS 1 3-9 DS 13-19 DS 13-21 ~]3-24~ DS 14-14 Pe.r. mit No. 81-121 Permit No~. 81-158 Permit No. 81-180 Permit No. 82-53 Permit No. 82-65 Permit No. 81-101 Permit No. 81-102 Enclosed are the Completion Reports for Work done on the above-mentioned wel 1 s. Very truly yours, D. F. Scheve Regional Engineer DFS/JCD/lw Enclosures cc' Sohio Petroleum Co. JUL - 1 1983 Aiask. a 0ii & Gas Cons= Commission. Anch0mge ALASK ~_,LAND GAS CONSERVATION C .,MISSION '~- ..... WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [~ Water Injection 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-101 3. Address P. 0. Box 100360, Anchorage, AK ~99510 4. Location of well at surface 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UN At Top Producing Interval 271' FNL, 2530'.FEL, Sec. 10, T10N, R14E, UM At Total Depth 8. APl Number 5oq329-20624 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 11. Field and Pool 1R3' FNI; 2238' FF/; Sec. 10; T!0N~ R14E~ UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Pool RKB 71' I ADL 28312 12. Date Spudded 113. DateT.D. Reached 114. Date Comp., Susp. orAband, llE. Water Depth, ifoffshore 116. No. of Completions 10/26/81 + I pll/13/81 [ 11/19/81 ___ feet MSL 1 17. Total Depth (MD TVD)I18. lug Back Depth(MD+TVD)I 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10765'MD,9405'TV[~ 10721'MD,9364'TV[~YES[X NO[]] I 2202' feetMD ]800' (approx) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, GR/IEL, DENSITY/CNL/GR, CBL/GR 23. CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. GRADE 20" 94# H-40 13-3/8" 72# L-80 9-5/8"' 47# L-80 & S00-95 7" 29# L-80 9619' 10762' 24. Perforation open to Production (MD+TVD of Top and Bottom and interval, size and number) SETTING DEPTH MD TOP BOTTOM Surf 80' Surf 2581' Surf 9900' HOLE SIZE 32" 17-1/2" 12-1/4' 8-1/2" CEMENTING RECORD AMOUNT PULLED 300 sx permafrost 3000 sx AS III & 40¢ sx AS II 500 sx Class G cmt. 1350 sx Class G cmt. 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 9644' 9576' 10t1'8'-1~0128' MD 100801-10094' MD 8784'-'8826' TVD Ref' FDC/CNL 11/12/81 4 spf 5-1/2" 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT &KIND OF MATERIAL USED N/^ 27. PRODUCTION TEST Date First Production I' Method of Operati'on~'(Flowing, gas lift, etc.) Water InjectionI N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL IGAS-MCF N/A ' : TESTPERIOD:~ :: ' II ''~ Flow Tubing Casing Pressure . CALCULATED I~'IOIL-BBL IGAb-MCF' Press. . 24-HOUR 'RATE. "r'I' · . 28. CORE DATA WATER-BBL WATER-BBL ! CHOKE SIZE IGAS-OIL RATIO I O L:GRAVITY-API (corr) · Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev, 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ............... Top Sadlerochit 10037' 8746' Base Sadlerochit 10656' 9304' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title ~,,~ ...... ! INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification oi~ Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), s~,~. state in item 16, and in item 24 Show the producing interw~.~ for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.). Item 23' Attached supplemental ,~.ecords for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc Post Office ( 360 Anchorage, Ai.]ska 99510 Telephone 907 277 5637 June 23, 1983 Reference: Arco PressUre Data D.S. 2-25 3-25-83 3-23-83 D.S. 2-26 · 3-24-83 3-24-83 D.S. 7-7A, 5-29-83 ~.S. 13-6~' 4-17-83 D.S. 13-18~' 5-19-83 D.S. 13-20" 5-20-83 D.S. 14-13" 5-21-83 D.S. 18-10 ~ 5-19-83 5-19-83 Pressure Build-up Pressure Build-up Survey Report Pressure Build-up Pressure Build-up Survey Report Static Survey · Ihjection Fall-Off Pressur~ Suryey Pressure Draw-down Pressure Draw-down Pressure Fall-off Pressure Build-up Pressure Build-up Survey Report DA DA DA Ca~co Ca/nc o Ca/~co GO / /Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. # 391 NORTH GEOLOGY R&D DRILLING PHILLIPS SOH I 0 MARATHON CHEVRON DISTRIBUTION EXXON MOB I L GETT - '..,¢/2,,:~ !': ~' ,F ! !? ~ ~"~ D & ; 1~',~ STATE OF ALASKA, .,,., DALLAS _., CAROLINE SMITH ARCO. Alaska; Inc. ["' Post Office Eic~ .60 Anchorage. AlasKa 99510 Telephone 907 277 5637 June 10, 1983 Reference: Arco Cased Hole Finals ~"D.S. 1-8..~ .,,4-18-83 CH CNL Run 6 5" ~--D.S. 1-24~? '2-4-83 PLS/Temperature Run 1 5" ~-D.S. 5-11~' 4-17-83 EPL Run 1 5" ~--D.S. 5-11~ 4-17-83 PAL ·Run 1 5" vD..S. 6-17~/ 2-11-83 PLS/Temperature Run 1 5" -~D.S.~ 7-20~' 2-13-83 ACBL/VDL/GR/Sig Run 1 5" ~'D.S. 9-4~' 4-17-83 CH CNL Run 7 5" ~D.S. 11-6j 4-22-83 CFS Run 1 5" -~D.S. 12-17/ 2-3-83 ACBL/VDL/GR/Sig 'Run 1 5" ~-D.S. 14-13~ 4-25-83, EPL Run 1 5" Sch DA Sch Sch DA DA Sch GO DA Sch Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. ~ 368 DISTRIBUTION .'.,.i._,; O-~.:..GEOLOGY '. ] R&D ).~'FHI'ELI .';~?.S~IQ:T~~-, MARATHON CHEVRON .-MOBIL J D&M ~,~-,.~,~:.~-,- ~.,.:..~,.. _ .;-STAIE..OF A~S~ DALLAS CAROLINE SMITH RECEIVED ). iS 1983 Alaska ARCO Alaska, Inc. Post Office B Anchorage, Alaska 99510 Telephone 907 277 5637 May 18, 1983 Reference: Arco Pressure Data D.S. 4'-5'% 5-4-83 D.S. 14-6-'/ 3-21-83 --.D.S. 14-13 4-23-83 Static Survey Pressure Build-up Pressure Data Pressure Build-up Otis Otis Sch D.S. 15-12¢ 4-24-83 Camco 4-24-8.3' Pressure Build-up Survey Report Please sign and return the attached copy as receipt of data. Kelly McFarland AFA-403 Trans. ¢ 344 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO' MARATHON CHEVRON EXXON MOBIL GETTY D &M STATE OF ALASKA DALLAS CAROLINE SMITH ARCO Alaska, Inc( Prudhoe Ba~ _ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 15, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: D.S. 13-2A D.S. 13-11 D.S. 13-13 D.S. 14-13 D.S. 14-14 Permit No. 83-21 Permit No. 81-76 Permit No. 82-178 Permit No. 81-101 Permit No. 81-102 Attached are "Notice of Intention" Sundry Notices for work proposed on the above-mentioned wells. Very truly yours, D. F. S cheve DFS/TKKW/lmi At tachment s cc: Sohio Petroleum ARCO Alaska, Inc. Is a Subsidiary of AtlanllcRIc'3fleldCompany  STATE OF ALASKA :O~,v ALASKA iLAND GAS CONSERVATION C ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL:~ OTHER [] 2. Name of Operator. 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20624 4. Location of Well 1402' FNL, 1019' FEL, Sec. 9, T10N, R14E, UM 9. Unit or Lease Name Prudhoe Bay Unit 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UM 183' FNL, 2238' FEL, Sec. 10, T10N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 71' RKB 6. Lease Designation and Serial No. ADT. 28312 10. Well Number DS 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate ~] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment ' [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit Sand for injection into the Prudhoe Bay Unit. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Intervals Ref: FDC/CNL 11/12/81 10037-10066 '~. }~D . 1008-0-t.0094 ''~' ~ !0118't0128" MD Alaska OL, & 8as Cons. (;omrnission 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of Approval, if any: Approved by COMMISSIONER 2~pproved Copy [aturned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in TripJicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. { Prudhoe Bay'r_,,gineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 283 4248 Donald F. Scheve Regional Operations Engineer February 2, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: D.S. 14-13 Permit No. 81-101 14-14 81-102 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/TKKW/lmi Attachments cc: Sohio Petroleum ARCO Alaska, Inc, Is a Subsidiary of AflantlcRIchfleldCompany ALASKA ~L AND GAS CONSERVATION C v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O.. Box 360, Anchorage, Alaska 99510 50- 029-20624 4. Location of Well 1402'FNL, 1019'FEL, Sec. 9, T1ON, R14E, UM 271'FNL, 2530'FEL, Sec. 10, TiON, R14E, UM 183'FNL, 2238'FEL, Sec. 10, TiON, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 71' RKB 6. Lease Designation and Serial No. ADL 28312 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other ~~?d~' Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. has converted well D.S. 14-13 to produced water injection service. This well is part of the Flow Station 3 Injection Project and was intended for this service as indicated in the "Application for Approval as a Qualified Tertiary Recovery Project for Purposes of the Crude Oil Windfall Profit Tax Act of 1980, "(August, 1982). The well began receiving water on January 25, 1983. Note: Due to an oversight, the "Notice of Intention'' was not submitted. RECEIVED F E B - 4 B83 Alaska 0il & Gas Cons: C0mmJssi0n Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~/. ~/~/~ ~./~.-- ~~c- Title Regional Operations Engineer Date The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date __ Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate AR~fJ AlasKa, inc. Post Office Box 360 Anchorage. ~' -ka 99510 Telephone 9~, _77 5637 December 30, 1982 RE' ARCO Cased Hole Finals D.S. 13'5 10-29/30/31-82 Spinner Camco D.S. 14-13 - 10-6-82 Spinner Camco D..S. 17-8 10-28/29-82 Spinner Camco D.S. 18-7 Initial run Perf. and Collar Log Camco · sign and return the attached copy as receipt of data. Becky Benedict. AFA - 403 Trans. #685 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M~ ~ Alaska Oil & Gas Cons. Anchorage ARCO Alaska. Inc. is a Subsmdiary of AtlanticRichfieldCompanv ARCO Alaska, Inc. Post Office I~ 360 Anchorage, ASo:~ka 99510 Telephone 907 277 5637 November 15, 1982 Re: ARCO Pressure Data D.S. 14-13 10-6/7-82 D.S. 14-14 9-3/5-82 D.S. 14-20 9-2-82 D.S. 17-9 10-8-82 Pressure Build-Up Survey Pressure Build-Up Survey Pressure Build-Up Survey Pressure Build-Up Survey ase sign and return the attached copy as receipt of data. Camco Camco DA DA Becky Benedi ct AFA - 403 Trans. #610 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON yas Co,s GE~Y D&M STATE OF ALAS~ DALLAS ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Inc .... Post Office!' : 360 Anchorage, Alaska 99510 Telephone 907 277 5637 September 22, 1982 Mr. C. V. Chat Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton- Re: D.S. 12-14 - Permit No. 81-138 D.S. 13-8 - Permit NO. 81-148 D.S. 13-12 - Permit No. 80-142 D.S. 14-13 - Permit No. 81-101 D.S. 14-14 - Permit No. 81-102 D.S. 14-15 - Permit No. 81-84 Enclosed are Completion Reports for work done on the .above- mentioned wel 1 s. Very truly yours, D. F. Scheve Regional Engineer DFSo TKKW. skh Enc]osures cc: Sohio Petroleum Co. ARCO Alaska. Inc is ;~ subsidiary ol AllanticRi(:hheldComp,'~ny WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL rXl GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P. O. Box 360; Anchora§e, AK 99510 50- 029-20624 4. Location of well at surface 9. Unit or Lease Name 1402'FNL, 1019'FEL, Sec. 9, TION, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 271'FNL, 2530'FEL, Sec. 10, TION, R14E, UM D.S. 14-13 At Total Depth 1 1. Field and Pool 183'FNL, 2238'FEL, Sec. 10, TION, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Pool RKB 71'I ADL 28312 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 10/26/81 11/13/81 11/19/81 -- feetMSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost !0765'MD 9405'TVD 10721'MD 9364'TVD YES~] NO[] 2202' feetMD 1800' (approx.) 22. Type Electric or Other Logs Run [1TI /gP/BH£S/GR: GR/IEL, DENSITY/CNL/GR, CBL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" .94# H-40 Surf 80' 32" 300 sx permafrost 13-3/8" 72# L-80 . Surf .2581"" 17-1/2" 3000 sx AS III & 40)sx AS II 9-5./8" 47# L-80 & Surf 9900' 12-1/4" 500 sx Class G cmt. S00-95 7" 29# L-80 9619' 10762' 8-1/2" 350 sx Class G cmt . 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD -- interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) - 5-1/2" 9644' 9576' Ref: DIFL 11/12/81. 10094-10114'MD ... 10134-10164'MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. , -- 10170-10188'MD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10204-10214 'MD _N/A 10224-10242'MD -- · 8797-8930' TVD ~?. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 7/15/82I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL 8/14/82 6,2 TESTPERIOD ~ ! 1601 ~1316 0 83 A~nera~22 Flow Tubing ~ Casing Pressure CALCULATED..k OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press'728 N/A 24.HOURRATE "F 6199 5096 0 27,0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. , Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sad] erochil 10037' 8746' Base Sad]eroch' t 10656' 9304' 31 LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~. ~'~~ Title Reg'i ona'! Ellg-i neer' Date ~"/~-- '~'"/~"',~.-- INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt .water disposal, water supply fOr injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this welL.is completed for separate production from more than one::.,interval (multiple completion), so state in ite~:. 16, and in item 24 show t,he producing intervals for only thS;::::interval reported in item 27 '~Submit a separate form for each additional interval to be: separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 August 3, 1982 Mr. C. V. Chat Chatterton Alaska Oil and Gas Conservati on Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Re. D.S. 14-11 ~' D.S. 14-13 D.S. 14-14 D.S. 14-16 D.S. 15-11 D.S. 15-12 D.S. 15-13 D.S. 15-14 D.S~. 15-15 Permit No. 80-131 Permit No. 81-101 Permit No. 81-102 Permit No. 81-81 Permit No. 81-132 Permit No. 81-146 Permit No. 81-124 ~Permit No. 81-170 Permit No. 81-181 Enclosed are. "Subsequent" Sundry Notices detailing work done on the above-mentioned wells. Very truly yours, D. F. Scheve Regional Operations Engineer DFS-TKKW: ml c Enclosures Distribution- Sohio Petroleum Co. ARCO Alaska. Icc is a su~;sidia~y ol AltanlicRichfietdComp.ar~y K~A STATE OF ALASKA ~'~ ALAS OIL AND GAS CONSERVATION MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. 360 Anchorage~ Alaska 99510 4. Location of Well 1402'FNL, 1019"FEL, Sec 9, T10N, R14E, UM (s~rface) 271'FNL, 2530'FEL, Sec 10, TION, R14E, UM (top producing) 183'FNL, 2238'FEL, Sec 10, TiON, R14E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 71'RKB I ADL 28312 7. Permit No. 81-.101 8. APl Number 50-- 029-20624 12. 9. Unit or Lease Name Pr~dho~_ Bmv TTn-lt 10. We~ Number D. S' 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 7-10-82. RU perforating unit, pressure tested surface equipment. RIH with gun #1, shot 10224~.0~'MD 4 spf (18' ref CNL 11-23-81), flowed to tank for clean-up, monitored rate, and took shakeouts. POH - 2 shots misfired, RIH with gun #2, shot 10204-10214'MD, I0180±10'188'MD. 4 spf (10' and 8' ref CNL 11-23-81), flowed to separator for'clean-up. POH - all shots fired. RIH with gun #3, shot 10170'-10180'MD, 10154'-10164'MD. 4 spf (10' and 10' ref CNL 11-23-81), flowed to separator for clean,up. POH - all shots fired. RIH with gun #4, shot 10134'-10154'MD. 4 spf (20' ref. CNL 11-23'81), flowed to separator for clean-up. POH - all shots fired. RIH with gun #5, shot 10094- 10114'MD, 4 spf (20' ref CNL 11-23-81), flowed to separator for clean-up. POH - all shots fired. RD. Ran SSSV. Secure~ well 7-15-82. AUG- 6 0i~ & Bas Cons. C0mmissi0~ 14. I hereby,e~rtify that the foregoing is true and correct to the best of my knowledge. Signed __ . _ _ Title Regional Engineer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office B~x 360 Anchorage.(' ;ka 99510 Telephone 907 277 5637 July 27, 1982 Reference: Arco Pressure Data D.S. 14-13 D.S. 14-14 D. $. 15-15 7-12-82 7-12-82 6-28-82 Shut-in Pressure Gradient Survey Shut-in Pressure Gradient Survey Shut-in Pressure Gradient Survey GO GO GO Please sign and return the attached copy as receipt of data. Kelly McFariand Trans. ~ 321 DISTRIBUTION NORTH GEOLOGY DRILLING MARATHON CHEVRON GEOLOGY Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, In~.' Post Office B~.. 360 Anchorage, Alaska 99510 Telephone 907 277 5637 June 11, 1982 Mr. C.D. Chat Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Subject: D.S. 14-13 Permit No. 81-101 Enclosed is our Sundry Notice detailing the work to be done on the above mentioned well. Very truly yours, D. F. Scheve Regional Engineer DFS:TKKW:kam Enclosure JUN 1 4 1982 A!~oka 0il & Gas Cons. Commission Anch0rag9 ~ · ARCO Alaska, Inc. is a Subsidiary of At{anticRichfieldCompany (r STATE OF ALASKA ~, ALASKA ~,L AND GAS CONSERVATION ~ ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O. BOX 360 Anchorage, AK 99510 50-029-20624 4. Location of Well 1402'FNL, 1019'FEL, Sec 9,T10N,R14E, UM (surface) 271'FNL, 2530'FEL, Sec 10, T10N,R14E, UM (top-producing) 183'FNL, 2238'FEL, Sec 10, T10N,R14E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) RKB 71 ' 12. I 6. Lease Designation and Serial No. ADL 28312 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data Perforate Stimulate Repair Well Pull Tubing NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) ~,. Alter Casing [] Perforations ~ Altering Casing [] Abandon [] Stimulation [] Abandonment [] Change Plans [] Repairs Made [] Other [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe proposed Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit Sand for production from the Prudhoe Bay Unit. Upon perforating, the well will be flowed to the flow station for clean-up and production. Should additional drawdown be necessary to unload the wells, it may be flowed to a tank for initial clean-up, The perforated intervals will be given in the subsequent report. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to working pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. JUN 1 4 ]982 AJaska 0il & Gas Cons. Commissio~ - Anc?10rag9 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. si., d The space below for Commission use Engineer Date Conditions of Approval, if any: COMMISSIONER Approved Cop,/ Returned By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Telephone 907 277 5637 May 11, 1982 Mr. C. V. Chatterton Commissioner StaLe of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Well Completion Reports Dear Mr. Chatter[on: Enclosed are revised completion reports and gyroscopic surveys For the Following wells: DS 13-6 DS 13-9 ,,DS 14-1.3 DS 15-11 DS 16-1 The original completion reports indicated that certain items would be submitted at a later dale. These items are now included irt the attached completion reports. Sineerely~ P.A. VanDusen ~/,~,,,,, District Drilling Engineer PAV: Jg/1 lm Enclosures GRU5/A13 · WELL COMPLETION OR RECOMPLETION FIEPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Aiaska, Inc. 81-101 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 - $0-029-2062z~ 4. Location of well at surface LO(]ATtOI-qS. 9. Unit or Lease Name lZ~02' FNL, 1019' FEL, Sec. 9, T10N, RlZ~E, UN VERIFIED Prudhoe Bay Un±t At Top Producing Interval Surf. ~ 10. Well Number 271' FNL, 2530' FEL, Sec. 10, T10N, R14E, UN B.H. F- _ 14-13 ,, , At Total Depth 11. Field and Pool 183' FNL, 2238' FEL, Sec. 10, T10N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe 0il Pool 71' RKBI ADL 28312 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 10/26/81 11/13/81 11/19/81 IN/A feet MSL 1 10765'MD,9405'TVD 10721'MD,9364'TVD YES~[] NO[] 2202' feetMD 1800' (approximate) 22. Type Electric or Other Logs Run DIL/SP/BHCS/GR, GR/IEL, DENSITY/CNL/GR, CBL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 20" 9Z;# H-Z~0 Surf 80' 32" 300sx Permafrost 13-3/8" 72# L-80 Surf ' 2581' 17-1/2" 300'0sx AS III & z;00 sx AS II 9-5/8" 47# L-80 & Surf 9900' 12-1/4" 500sx Class G cmt S00-95 7" 29# L-80 9619' 10762' 8-1/2" 350sx Class G cmt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A. 5-1 / 2" 96z~4 ' 95 76 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A. 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing; gas lift, etc.) N/A. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO ' : TEST pERIOD ~ Flow Tubing Casing Pressure .. CALCULATED '.k OIL~BBL · GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE mlr 28. CORE DATA Brief description of lithology, porosity, fractures, aPparent dips and presence of oil, gas or water. Submit core chips. N/A. Form 101407 CRUZ,/B25/26/27 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE MEAS. DEPTH TRUE VERT. DEPTH ~OR, and time of each phase. Top Sadlerochi[ 10044' 8752' N/A. O/W Con[ac[ 10418' 9087' Base Sadleroehi[ 1066~' 9311' 31. LIST OF ATTACHMENTS Gyroscopic Survey (2 copies) 32. I herebg certifg that the fore~oin~ is true and correct to the best of m~ knomled~e S,~ned ~~ T,t,~ Area D~lg. Eng,. Date ~/~/~ .... INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item .,16 and 24: If this well is completed for separate production, from more than one interval (multiple completion), so state in item 16?and in item 24 show the produci~g intervals for only the interval reported in item 27. Submit a separal~e form for each additional interval to be separately produced, showing the data pertinent to such intervaC Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other,exPlain. Item 28' If no cores taken, indicate "none" Form 10-407 ARCO Alaska, Inc. ,~ Post Office t~ 350 Anchorage. Alaska 99510 Telephone C-07 277 5637 March 29, 1982 Reference: ARCO DIRECTIONAL SURVEY DATA D.S.13-9 '3/1/82 D.S. 14-29 2/27/82 Gyroscopic. Multi-Shot Gyroscopic Multi-Shot Single-Shot Jon No. AO382G0405 Job No. A0382G0406 Job No. AO282D0268 Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineer£ng Transmittal #70 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M Alaska Oil & Gas Cons. Commission Anchorage GEOLOGY STATE OF ALASKA ARCO Alaska. J,qc. Is a sucs~;gi~ry ct AllantlcRichfie!GCompany District OperaJions Engineer March 16, 1982 Mr. C. D. Chat Chatterton State of Alaska- Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton- Subject: D.S. 4-11 Permit No. 78-6 D.S. 4-14 Permit No. 78-36 D.S. 11-1 Permit No. 81-123 D.S. 11-2 Permit No. 81-128 D.S. 11-3 Permit No. 81-147 D.S. 11-5 Permit No. 81-155 D.S. 11-6 Permit No. 81-161 D.S. 12-4A Permit No. 81-187 D.S. 12-7A Permit No. 81-175 D.S. 12-8B Permit No. 81-167 D.S. 12-13 Permit No. 81 -87 D.S. 13-5 Permit No. 81-103 D.So 13-7 Permit No. 81-129 D.S. 13-8 Permit No. 81-148 D.S. 13-9 Permit No. 81-158 D.S. 13-10 Permit No. 81-165 D.S. 13-12 Permit No. 81-142 D.S. 13-19 Permit No. 81-180 D.S. 14-12 Permit No. 81-109 D.S. 14-13 Permit No. 81-101 D.S. 14-26 Permit No. 81-110 D.S. 12-14 Permit No. 81-138 Enclosed are our Sundry Notices detailing the work to be done on the above mentioned well. Very truly yours, · · J. A. Rochon JAR-TKKW :ml c Enclosure Anchorage ARCO Alaska. Inc. is a subsidiary o! Allanl,clt~ch~:..:,lCumpau~y SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O. Box 360 Anchorage, AK 99510 50-029-20624 4. Location of Well 1402'FNL,1019'FEL,Sec 9,T10N,R14E,uM (surface) 200'FNL,2700'FWL,Sec 10,T10N,R14E,UM (TD-taken from single shot directional survey-gyro not avail- able at this time) 5. Elevation in feet (indicate KB, DF, etc.) RKB 71 ' I 6. Lease Designation and Serial No. 12. ADL 28312 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate / [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadierochit Sand for production from the Prudhoe Bay Unit. Upon perforating, the well will be flowed to the flow station for clean-up and production. Should additional drawdown be necessary to unload the wells, it may be flowed ~o a tank for initial clean-up. The perforated intervals will be given in the subsequent report. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to working pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. SuBsequeNt Wor]~ Bepo~tecl 14. I hereby certify that the foregoing~and correct to the best of my knowledge. Signed '~ Title Dist, Oprs: The space b~?o~ for Commission use Engineer Date Conditions of Approval, if any: '- Approved by Appreveg Copy Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate February 1, 1982 Reference: ARCO CASED HOLE FINALS D.S. 14-26 12/31/81 CNL ~ D.S. 14-12 12/5/81 CNL Run 1 Run 1 2"/5" 2"/5" D.S.13-3 / 1/2/82 Gamma Ray Run 1 5" D.S'. 15-10 ~.-~' 12/3/81 Collar Log Run 1 '5" ----- D.S.14-26'--~, 1/4/82 ACBL/VDL/GR Run 1 5" D. S. 14-14 L'~ 10/29/81 D.S. 13-19 ,~'/~/18/82 CNL/GR ACBL/VDL/OR Run 2 Run 1 2"/5" 11 ._ D. S. 14-13,75 11/23/81 CNL s. cm., -----D;Sol3-10 12/5/81 D..oS.14-13· / 11/23/81 D.S.14-12d 12/7/81 Run 1 2" Run 1 5" Temp Log Run i 2"/5" CCL With Gyro Run 1 2"/5" CBL/VD Run 1 5" D.S.15-13 x~/11/28/81 CBL/VD Run 1 '5" *NOTE::D.S.14-13 2" CNL is dated incorrectly and the date should be 11/23/81 instead of 11/2/81. /~e sign and return ~the attached copy as receipt of data. Mary Fo Kellis North Engineering~ Transmittal # 924 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA cHEVRON ARCO Alaska. inc. Is a ~,ul.;~-J,ary ol Alt.'lnlic~l~chheldCompany Oil & Gar, Cons. CommJssior} tmcborage ARCO Oil and Gas Company North Alask~f'";strict Post Oil;ce ~ 350 Anchorage. Alaska 99510 Telephone 907 277 5G37 Jerry A. Rochon District Operaiions Engineer january 11, 1982, Reference: ARCO MAGNETIC TAPES & LISTINGS D.S'.12-7~$~'' 12/24/81 D.S.11-5~ 12/23/81 D.S.14-12/ 2/23/81 D.S.12-8BV' 12/19/81 D.S.15-14V'~ 12/17/81 D.S.9-5~ 12/13/81 D.S.i~-13 L,,'" 11/23/81 D.S.15-12O/ 12/22/81 Tape #62424 TaPe #62421 Tape #62425 Tape #61416 Tape #62376 Tape #62365 Tape #62326 Tape #62426 ..... I. 4 ENG t ! ]"2GEOi ...... 3 ~ STAT TEC J ,,STAT TEC-" I J FILF: gn and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #871 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS MARATHON CHEVRON Nask~ Oil & G~B Cons. Commissieo ARCO Oil and Gas Company is a Divi.s~on ol ,AllanticRichlieldCompany ARCO Oil and Gas,~:'3mpany North Alas~, ~istricl Post Office Box Anchorage, A!~-~ska '2.9510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer .D'ecember 18,.,~,781 ReferenCe: ARCO Cased Hole Finals D.S.12-14 11/10/81 D.S.ll-3 11/21/81 D.S.6-6 10/28/81 D.S.ll.3 11/21/81 D. S. 14-13 11./17/81 D.S.16-8 10/9/81 CNL Run 1' 5" CNL Run 1 5" Gamma 'Ray Run 1 5" CBL/VD Run 1 5" CBL/VD Run 1 5" Spinner Survey Run 1 5" /~l~se~,.sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 833 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO O*1 and Gas Company Is a O~vl$1on et AtlanbcRichhel(3Company EXXON MOBIL GETTY PHILLIPS so 'o · V.,I I) ~S~ O# & Gas Cons. ~chorago Commission ARCO Oil and Gas Company North Alask~''~' ;strict Post Office [ ~'" Anchorage, A~aska '~9510 Telephone 907 £77 5537 Jerry A. Rochon District Cperaiions Engineer December 15,.1981 Reference: ARCO Magnetic Tapes & Lists D.S.14-15 9/24/81 Tape # ECC 1127 DIFL,CDL,CN,GR,SP,BHC,AC,CAL 10680-11650 D.S.14-13 11/8/81 Tape # ECC 1125 DIFL,CDL,CN,GR,SP,BHC,AC,CAL 2550-10800 Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmi~alL # 823 DISTRIBUTION NORTH GEOLOGY EXXON R & D MOBIL DRILLING GETTY ENG. MANAGER PHILLIPS D & M SOHIO GEOLOGY MARATHON STATE'OF ALASKA CHEVRON ARCO Oil and GaS Company tS a D~'~s~on of AtlanhcRichtieidCompany DE,., -" Oil & Gas Cons. Commissio~ Anchorage ARCO Alaska, Inc. ,~Post Olfice B'o~ :0 ,I Anchorage. Ah-;~a 99510 Telephone 907 277 5637 December 22, 1981 Mr. Hoyl e Hamil ton State of Alaska Alaska Oil and Gas Conservation Commi ssion 3001 Porcupine Drive Anchorage, AK 99501 Subject' DS 11-3, DS 12-8B, DS 12-14, DS 13-9, DS 13-10, DS 14-12, DS 15-13, DS 14-13, lA-9, lA-10, B-9GI, B-IOGI Dear Sir- Enclosed please find the following' 1. Monthly Reports for drill site 13-10, 14-12, B-IOGI. Well Completion Reports for drill sites ll-3, 12-14, 13-9, 14-13, 15-13. 3. Completion Gyroscopic Surveys for drill sites 12-8B, 15-13, lA-9, lA-10 and B-9GI. Sincerely, P. A, VanDusen District Drilling Engineer PAV' GA- 1 tc RE£EIVED DISC2 ~ 1981 Alaska Oit & Gas Cons. Commissior~ Anchorage ARCO Alaska. Inc. is a subsidiary of AtlanticRichfieldCompany ' [ STATE OF ALASKA -. ALASKA .~ ,ND GAS CONSERVATION CC., iSSlON WELL COMPLETION OR RECOMPLETION R PORT AND LOG 1. O~atus of Well Classification of Service Well OIL)~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P. O. Box 360, Anchorage, Alaska 99510 5o- 029-20624 '4. Location of well at surface 9. Unit or Lease Name 1402' FNL, 1019 FEL, Sec. 9, T10N, R14F., UM ~-'LOC~T'~o~s~/ Prudhoe Bay Unit At Top Producing Interval VERIFIED 10. Well Number 14-13 To Be Submitted. , Surf. , At Total Depth B.H. ~ 11. Field and Pool To Be Submitted. -~ t>rud~oe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ~'u~oe 0il Pool RKB 71'I 28312 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ! 15. Water Depth, if offshore 116. No. of Completions 10/26/81 11/13/81 11/19/81I feet MSLI 1 .-17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10765' MD 10721 ! MD YESXX NO [][ 2202 ! feet MD 1800' (approx.) 22. Type Elec~'ric or Other Logs Run DIL/SP/BHCS/GR, GR/IEL, DENSITY/CNL/GR, CBL/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP -BOTTOM HOLESIZE 'CEMENTING RECORD AMOUNT.PULLED 20" 94# H-40, Surf. 80' 32" 300 sx Permafrost 13-3/8" 72# L-80 Surf, 2581' · t7½" 3000 sx A.S.III g 430 sx A.S. II 9-5/8" 47# L-80/ Surf. 9900' 12~" 500 sx Cla55 "G" cnt. S00-95 ~" 350 sx Class "G" c:nt 7" 29# L-80i 9619 10762 ' 8>. . 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD . interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) z,, 9644' 9576' 2 To Be Submitted. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. · " '"': ": DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED : ' i :,.~ · . N/A , . , -. · . · 27. PRODUCTION TEST Date First. Pr. oduction .'. I.M~th0d"of Operation (FlOwing, gas lif~', etc.) ' ' N/A[ '. Date of Test Hours Tested PRODUCTION FOR OI L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD .... Flow Tubing . Casing Pressure CALCULATED OIL~BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr} Press. . 24-HOUR RATE '.' ' 28. CORE DATA . -Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .. ,. · ,, '. ' ..,- ..,,. '.', :' .DEC2- '198! Alaska 0il & Gas Cons. 6ommissiorl Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME ~ Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. TO BE UBMITTED _. 31. LIST OF ATTACHMENTS · ,, , 32. I hereby certifY that the foregoing is true, nd correct to the best of my knowledge Signed ~~i~~,~ Title Senior Drlg. ~'!,~Oate .... INSTRUCTIONS General: This form is designed for submitting a complete and correct 'well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells': Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. It~m 16 and 24' If this well is completed fori:!~eparate produ(~tion from more than one interval (multiple:~i completion)?§° state in item .~16, and in item 24 show the producing inte~als for only the.interval reported in item 27. Submit a .separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, .etc.). , Item 23: Attached supplement'al records for this well should show the details of any 'multiPie stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water I'n- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". DS 14-13 Drilling History NU 20" Riser. Spudded well @ 1900 hrs, 10/26/81. Drld 17½" hole to 2610' Ran 63 jts 13-3/8" 72#/ft L-80 csg w/shoe @ 2581' Cmtd 13-3/8" csg w/3OO~sx A.S. III and 400sx A.S. II. ND 20" riser. Instl~ 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok. Tstd csg to 2000 psi - ok. Drld FC & cmt. Tstd~csg to 2000 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 12¼" hole to 9920'. Ran 237 jts 9-5/8" 47#/ft L-80 S00-95 csg w/shoe @ 9900' Cmtd 9-5/8" csg w/SOOsx Class "G" cmt. Instld 9-5/8" packoff & tstd to 5000 ~si - ok. Tstd csg to' 2000 psi - ok. Drld FC & cmt. Tstd csg to 2000 psi' - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW- ok. Drld 8½" hole to 10,765'TD. Ran DIL/SP/BHCS/GR, GR/IEL, and density CNL/GR. Arctic packed 9-5/8" x 13-3/8" annulus w/300 bbl H20, 300sx ACI and 131'bbl Arctic Pack. Ran 28 jts 7" 29#/ft liner 9619' to 10,762' Cmtd 7" liner w/350sx Class "G" cmt. Drld cmt to 10,721' PBTD. Ran GR/C~L. Tstd lnr lap to 2000 psi - ok. Displaced well to NaC1/NaBr. Ran 5½" completion assy w/tail @ 9644' & pkr @ 9576'. Tstd tbg hanger & packoff to 5000 psi - ok. Displaced well to diesel. Dropped ball & set pkr. Tstd tbg to 2000 psi & ann to 200 psi - ok. Tstd tbg to 200 psi' & ann to 2000 psi - ok. Closed SSSV @ 2202' MD. Instld tree cap & tstd to 5000 psi - ok. Secured well & released rig @ 0000 hrs, 11/19/81. DEC2'~ 198t A~sk~ Oil & Gas Cons. Commission Anchorage DS-14P .... WELt, NOI 1:'~ (~ PF~UDHO~ B~Y~ NORTH SLOPE~ ~'OAM~RA-'NOI ..... 1488 ......................... ~YRO"~'NO ";' ~>.. . ; . ,. ..~ .~ ' .~ .~ · .. 14~ W[,LL NO! ~3 8H8 JOB NOI A0~8'2~0405 · T~H~ DATE TRUE tEAGUF(ED.-~DRT. FT" ......... DF([F'T '-'COURSE VERTICAl. VERTiCAl," SUBGEA- R E: C-T- A.-N-'-G~-I.I...I.r.-.A,,'R lIEF'TH ANGLE D~REC'rION LENOTH DEF'I'H SECT]ON TV[t C 0 0 R [I I N A l'g 8 D~S'IANCE DIRECI'ION SEVERI'I'~ O. 0 0 0 0 O. 0.00 0,00 -7~,00 0.00 ~ 0;00' 0.00 0 0 0,00 100.'" 0 15 S 67 0 W 100, ]00,00 -0.22 29,00 0,08 S 0,20 W. %,: 0,96 S 58 34 W 0,44 400, "0 30 S 8~ 0 W 100. 400.00 -1,44 ~29.00 0.29 ~ 1.42.~'W: 500., 0~:~ 0 0 0 100. 499,99 -1,B7 428.99 0.35 S ;~.;~? ~:l;:85LW:~?.:~l,.~";J.88 S. 79 21 W 0~0 800. 0 15 S 51 0 E 100. 799.99 -2.28 728.99 0.70 S 2.]7 W 2.28 S 72 7 W 0.46 900,~ 0 ~5 S 75 0 E 100. 899.99 -1,97 828.99 0.90 S ~;.~:'~1.78 W ; 1.99 S 6~ 17 W 0 10 1000, :~; 0 ~0 S 7] 0 E 100',.~ ....... 999.99~,~,~,~ -~.4~ 928.99 1.09 S - ~1.~5 W ' 1.58 S 46 40 W 0.25 1500. 0 45 S 73 0 W 100, 1499.97 -0.61 14~8:./97/~(')/Af, yFg'J:~6NN 0.76 W 1600. : 0 45 S 68 0 W 100. J5~.96 -J,92 J528.96 0~08 S 1,99 W 1.99 S 87 44 W 0,07 1800. 0 45 S 3 0 E 100, 1799,94 -2.5~ 1728.94 2.~9 S 1.89 W 3.05 S 38 20 W 0.4I 1900. 0 ~0 S 82 0 E 100, -J899.94 -2.1J J828.94 ~.13 S 1,21 W ~.~6 S 21 9 W 0.82 I~. I~. ' :' fih 2000, 0 7.0 N 65 0 W 100, 1999.95 -1,Y7 I928,93 2,.,., B 1,04 W.': 2,76 2100. 0 30 N 76 0 E' 100. 2099.93 -1,5.1 2028.9~ 1.89 $ 0.98 W 2,12 S 27 21 W 0.94 ..... 2200-~- ........ 1 ......... 0-'S'-"89 ....... O'E ............ 100'. ........ 2199,92 ...................... 0',~'23 ........... 2128',92 .................... 1'."7'4-9 .... ' O'~-~2-'E ........... 1-~-'?'7 ......... S .... lO 25 E 0.5~ ....... 2~00, 0 45 S 59 0 E _100. 2299.91 1.03 ->~.o_¢~ 91 ~ 16 ,~ 1,77.E ,'. ~.,=,=,.,. ,_. . 2.79 S 39 2L~ E 0.,,,1 2400, 0 45 S 7 0 E 100. 2399.90 · ].36 2328.90 3,22 S '2,'46 E¢''';' ,4005 S 37 24 E 0.66 ................. ~"7'T ................................................................................................................................................................................................................................................................................... - .... ;'-,: ~';' ,S" '"7"i' -: r; -- , -~:, .. : i14'.98 8 30 13 E 0.27 2500'~ :0' 30 S 2 0 W 100. 2499.89 1,07 2428.89 4.30 8: i:~~ 517 E ~&O0, 0 .0 9 .~ 0 ~ lO0, .,.,~,8~ O,T& ~o~8,8~ .,18 ~ ~ .~,4.~ B ,u,7~ --2700"~-0--'30-S ...... 4 ..... O-E ................. 100'~ ....... 2699~"89 ............... 0--~'"49---2628'~"8~ ............ 6"~-'05-'S----2'r45-E~~"~-52 ..... S-'22 ...... ]' E" 0'~' 08 2800, 2 ~0 S 7~ 0 E 100. 2799,85 1.~6 2728,85 7,77 S ~.98 E 8.91 S 26 31 E 2.~7 '~ 52 · 2900. 5 0 S 78 0 E 100. 2899.62 6.89 2828.62 9.61 S lO,3J E', .;; 14,09 S 47 0 ~' .,., . :. . '~ ., ':'RIJDHOE"BAY'~ 'NORTH ~iLOF'E : ' I'RUE tE~ASURE:'[F"~R~FT ................ PRIF'I ..... COUR~;E VE:RT~At. VERTICAl.. I,I[:,F, TH ANOLE rIZRF~:I,,I~(')N I,.EN(:~TH FEET D M D M FEET I:~EP'rH SE:CI',TON 'I'VP C,, 0 0 F'~ET FEET F'EET F"EET. ,.. FEET, .1 00, :100 .. i00, 100, 100, 2999.07 .'1, 6. ,9;3 2928. O? 3098,16 29', 68 30'27.16 · 3.196i89 .......... 45i31 ..... `7295, O0 64.53 3224. O0 3392,07 88,18 3`72:1 , 07 100. ~487,82 115.85 3416.82 24.04 N 113.94 E ~'116.45 100, 3581,38 150.04 3510.38 42,44 N ..... ~700'; .... 25"~0-'N--62 ............ O-'E ....... lOOi" 3672"~"73 ....... 1.90~'00 ......... ~'601-i'73 ................. 6i'i-84--N .... i~9~OTE=----190-r05 .... ~BO0. 25 45 N 63 0 E JO0, 3763.08 23'>~.24 3692.08 81.6~ N 217.71 E o~.~ 51 3900. 27 0 N 63 0 E 100. 3852,67 276.08 3781.67 101.80 N 257,30 E' 276.70 N 78 5 E N 7~ ~5 E N"-71 .... 1 E N 69 27 E N 68 25 E 1,59 1,2~ 3,24 4,70 2','04 .... 0.86 1.25 4000, 28 15 N 83 0 E: 4100. 30 0 N 63 0 E .... 4200~----2;0--~45'-'- N-"65 ......... 0 '-' E 4300, 32 0 N 66 .0 E 4400. .-"43. 45 N 68 0 E 4500. ~5 ~0 N 4600. ~7 0 N .... 4700T ........ ~9-"'~O'-N 4800. ~ 15 N 4900. 40 0 N 71 0 E 71 0 E '73 ............ :'0 E:"; .......... 100. 7~ 0 E 100. 7~ 0 E 100. 100 "~ "> .~, ' "~- 9"~ ~ "~ ' 100::~? ~:~028.62;':~ :iT'6~<i':88::~Ty~95~?i"6~:) 144.95' N '~ :'341.97 E ~ ~ .: ...... .,,::,.,.~'%z .~ -.-%, .>.,: ..... :'-:r ,~ . ' ., .~ ~ ,~.. ·. ,:e '. 5. , ~.. ~ ~ .. .~m:~ ~: ~ ' ~.~., J 00. 4366.54 582,42 4295"~.JS~zi'(~L.,,~229~'~BO~.~N 5:~7.97 E 585. O0 N 66 52 100. 4447.18 641.53 4~76.18 249.05 N 593.88 E 643.99 N 67 15 4525~-71 .............. 703 .-4~ ........... 4454'¥"71 ............. 268'~' 18'-N .............. 6'52 ¥'75-E ........ 705",'69 ..... N-67 40 4603.01 766.87 4532.01 286.73 N 713.42 E 768.88 N 68 6 4680.03 830.64 4609.03 305.38 N 774.41 5 832.44 N 68 29 :'.322.8~ N 67 38 ~71.42 N 67 2 421'-r~2 ........ N'-66'40 "473.98 N 66 32 :528.25 N 66 35 E 1.25 E J.75 E 1,26--- E 1.35 E 2.06 E 2.44 E 1.50 E 2.79 .... E: 0.25 . 5000. 39 ~0 N 73 0 E 100. 4756.91 894.,,8 4685.91 324.07 N 835"56 E 896,20 5100. 38 45 N 74 0 E 100. 4834,49 957.66 4763,49 341.99 N 896.06 E 959.10 .... 5200:~'-:9 ....:"'O'"-N-"~3 ....... O-E ............. 100¥ ......... 491"2T"~4 ......... 1'020',-41 ........ 484'1"¥34 ......... G59"~'B2-N ..... 956T23-'E-:'l'02'1:-69-~ 5300.. 39 15 N 74 0 E 100+ 4989,92 108~.49 4918,92 ~77.74 N 1016,73 E 1084,64 5400, 39 0 N 74 0 E 100, 5067.50 . 114'6.56 4998,50 395,13 N 1077o'39 E:::1147oS6 N 68 48 N 69 7 N 69 37 N 69 52 E 0.50 E 0.98 · E .... 0~-68 E: 0.68 E 0.25 5500,'~' 2;9 0 N 73 0 E 100, 5145,21. 1209.48 5074,21 4.1.2~,0.1 N 1137,73 E 1210,37 N 70 5600, 2;9 4~ ,. N 7,3 0 E 100. ,.,~'-~'~,~.-.51 1272.91. 5151.51 431.56 N 1:1.98.:~9 E ?:1273,72; N 70 12 '--5700:~---:~9--30-'N -73 .... O-E ................. 1 O0 ,-: 5299, 53 ........... 1"336-~"68 ....~'z:: 8To2; .....4.,0-~' zO-N--l"-zug-r38-~,l-Bi~'7'r43- 'N-~0'"- 5800,. 39 30 N 74 0 E 100 ~;~76 70 1400 27 ~ ' · · · .ovo,70 468.27 N 1320,37 E 1400.94 N 70 28 ~00+' 40 0 N 76 0 E 100, ~*~. . . - ~. 58 1464 14 S::B2 58 484,82 N 1~82,~g ~ ~464 69 N 70 40 E 0.62; E 0.75 · E ........ 0 :-'25~ F.. O. 64 F. 1.37 14, WELL NO; 13 GMS :'RUDHOE-BAY~ ..... NORTH-SLOPE, .... ALASKA ,./OB NO; AO382G0405 TRUE 4EA'SURED-DR'I'F~ ..... DRIFT ................ COURSE VERTICAI.--VERT'ICAL ........... SIJBSEA ......... R -E:-C-'T'-A-N-G-tJ-I~.--A-R ......... (~-'I~--O-.S · U -R E DEPTH ANGLE DIRECTION LENGTH [EFTH~ ' SECTION TVD C 0 0 R D I N A T E $ DISTANCE DIRECTI FEET D M D H FEET FEET FEET FEET FEET ~ 'FEET )) 6000. 40 30 N 7~' · ., 0 E 100, 5529,9Q 1528,64 5458 90 · ..,00,99 N ]444,68 E 1529,08 N 70 6100, 40 15 N 75 0 E 100· 5606,09 1593,35 5535,09 517,76 N '1507,25 E 1~;93,70 N 71 ~--6200s-'--~'1-~5'"~N-76 ....... O-E ........... 100~ ...... 568~'",84 ......... ]'658,51'"'"~ .... 561"0,84 .......... 6300,:';' 42 30 N 76 0 E J00, 5756,30 1725,12 5685,30 550.25 N 16~i,21 ~EL 1725,31 N 71 6400, 43 15 N 77 0 E 100 5829 59 1792,97 .~7.,8,59 566,13 N 1701,37'E 179~,09 N 71 . · 6500, 44.~:'0 N 77 0 E 100, 5901,97 186],73 5830,97 581,65 N 1768"60i. E;',~ 1861,79 N 71 6600, 44:15 N 77 0 E 100, 5973,75' ]93~,11 5902,75 597,32 N i:'~836',441E 1931,13 N 71 ..... 6700~---4~-45--N--74 ........... O.-...E ............. 100, .... 6045°-69 ......... 2000-,-46 ........ 5974-,.69 ............ 6800, 44 0 N 74 0 E 100. 6117.77 2069,73 6046,77 6~3,81N 1970,30 E 2069,73 N 72 6900, 44 0 N 75 0 E 100~' 6189,71 21~9,14 6118·71 652,37 N 2037,24 E..~ 2139,]4 N 72 . DOGLEG. ON SEVERIT' N .x~G/IOOFT. 52 E 3 E 0,25 .13 E 1-,19 24 E 1.25 36 E 1.01 48 E 0,75 59 E 6 E ,20--1,4 10 E 0,25 15 E 0.69 7000, 43 45 N 75 0 E 100; 6261,79..~,..2208,37 6J90,79 670o3J N 2104,18 E 2208,;~7 N 72 20 E 7100. 43 30 N 75 0 .E ].00,;,'~; .:, 63~4, ]Gf~,:~.,;,.,,,2~lf;~:j'~i~6-26,5~'l, 8~f,~qb, 688.17 N<- 2J70.8~ E 2277.30 N 72 ~",:,~ E J O0 ':'~':"';" P': ~ ...... "":'~ ~ ~;~' ':' r- ,:~.:~5~ ~ .... ~.. . :' ' ' ~ ' 7400 40 45 N 75 '0 E :~ .6:~ 72 100,..~:-..6~,,,~0 ,,477~:9~,~.. ~4.84,.~,0~,~¢742~,.94,~;~U ,[/~..~,11-::E 2480 01 N 34 E ~ "~ ' ' - ~ ~ 33 E 2545, 7500.~: 41 15 N 74 0 E 100 6630.67 254 7600, 40 45 N 74 0 E JO0. 6706.~4 2611.10 6635.14 778,55 N 2492.40 E 2611.17 N 72 ;~9 E' ~7700, ........... 40 ..... JS-.N 74 ........... 0 .E ..... 100,-- 6782,-18 2676,0~ .......... 6711.,18 .......... 796.45--,N ......... 2554,.82-.,-E ....... 26-76,09 ......N-..72 E 7800. 39 15 N 74 0 E ~00, 6859.06 27~9,93 6788.06 8~4.08 N 2616.29 E 2740,02 N 72 E 7900. 38 15 N 73 0 E JO0, 6937,05 2802,50 6866.05 83~.86 N 2676,30 E~ 2802,60 N 72 E 8000. 37 30 N 74 0 E 100, 7015,98 2863,88 6944,98 849,29 N 27;~5.17 E 2863.99 N 72 8100, 37 15 N 74 0 E 100. 7095.45 2924,~,~5 7024,45 866.02 N 2793.52 E, 2~24.68 N 72 8200,: ......... 37 ............ 0-~N.,--..-74 ........... 0 E ........... J.O0. ....... 71-75-.o-.~8 ........ 298.4o-88 ........... 7-1-04-,-t8 ........... 882..66-N .......... 28.51~.,5~-...E~'~985-~02 ...... 8300, ~6 0 N 7~ 0 E 100, 7255.57 ~044.~5 7184,57 899,55 N 2908,56 E 3044,49 N 72 8400, 35 30 N 7~ 0 E 100. 73~6,72 3102·~7 7265,72 916,64 N 2964,44 E~:~.3102,92 'N 8500. 35 0 N 74 0 E 100. 8600, 34 30 N 74 0 E 100. 8700~---~4---0'"'N-'75 ............ O-'E ................ ].00, 8800, ~3 15 N 75 0 E 100· 8?00, 31 45 N 75 0 E 100o , 72 47 48 49 0.25 0,25 0,85 0.50 1.87 0.82 0.50 0,50 ...... 1,00 1,18 7418,39 3160,47 7347,39 933,03 N i-~019,78 E 3160,63 N 72 50 7500·55 3217,44 7429,55 948,74 N 3074,57 E ;~2J7,62 N 72 51 7583'i"21' ......... ~273'~68 ....... 7~'1'2~'21 ....... 7666.48 %~28.99 7595.48 978,11N 3182,29 E 3329.21 N 72 55 7750.82 ~82,66 7679°'82 992°02 N 3234.19 E 3382,91 N 72 57 41 44 45 E E 0.25 E 0-,25 E 1,16 E 0,50 E 0.76 E 0,50 ~'E .... 0,75 E 0°75 ... ."~S 14, 'WELL NO,* J. 3 GHS " , ,.10~ NO~ AO~82G0405 ' ""':'~:"?~"'?'TIH~' ' DATE :'RUDHOE~-B'AY~ .... NORTH~-SL'OF'E~,'' AI~ASKA TRUE 4E'ASgR'EZORI ~T ..... DR'I FT ............... C OURSE YERTI CAI:"'gERT I CAI; ........... SUDSE~ ..... R"' E'"-C-T--A-N-G-UL"L~'-R~-C-E-O-S--'ll R E [~OGL EG' DEF'TH ~NGLE DIRECTION LENGI'H DEPTH SECTION 7'~D C 0 0 R D I N R T E S DISTANCE DIREC'I'ION SE~ERIT~ . FEET g H D H FEET FEET FEJET FEET' FEET , FEET D H -~.~(~/100FT .................. ~ ..... ~ ................................................................................................... , ............................................................................... -: ................................ 9000, . 30 30 N 76 0 E 100. 7836.42 3434.26 7765.42 1004,96 N 3284;,23 E 3434.54 N 72 59 E 1,35 9100, 30 0 N 76 0 [~ ]00, 7~22.80 3484,o3 785~.,80 1017,~~., N 3333.~.1 E 3484.85 N 73 2 E 0,50 ...... ~200;,-~8~"~N-'7~- .... O'-"E' ........... ]'00'~' 801-0'~I5 9300." 28 15 N 76 () E 100. 8098.24 3580.33 8027,24 1040,37 N 3426,26:E'?~'m,:-~;,~,~80,7~ N 73 7 E 0.00 9400. 28 15 N 76 0 E 100, 8186,3~ 3627.56 8115.33 1051.82 N. 3472,18 E'?':~628.00 N 7~ 9 E 0,00 9500. 28 0 N 77 0 E 100, 8274,52 3674.57 8203.52 1062,83 N -,~518002 E~; 3675,06 N 9600. 28 30 N 77 0 E ]000 8362.61 3721,73 8291,6] 1073.47 N 3564.14 E~:/;3722~29 N 73 14 E ~0 .... 9700~9--~0-N--75 .............O--"E .................. 1'00-~ ........ 8450'~29 ......... 3-769-~-7~ .............. 8'~79"~-29 ..... 1'085'-,-J:-1--N~3"6-1"~81~8~3'YTO'~53---N--73--' 1. 6 E" '1", 08 9800, 28 30 N 75 0 E 100, 8537.96 3817.77 8466.96 1097.56 N 3657.27 E ~8J8,41 N 73 18 E 0,50 9'900, 28 45 N 73 0 E 100~ 8625.74 3865,66 8554.74 J110.76 N 3703.32 E ' ;~866.;~1 N 73 18 E 10000.. 28 45 N 73 0 E 100, ...... ~8713.41~,~9~3.75 8642.41 1124.83:N ::3749,~2;'E :~3914,41 N 73 18 E 0,00 10300, 25 30 N 73 0 E 100";::::J~:8979,98 .....4'85.!'"~::2~':~:89:08','~8 ".-j165 , 04 GN 'S~':~:~eS.:E 4051,95 N 73 17 E 1 50 10500, 24 ~0 N 73 0 E 100. 916J.06 4136.1~ 90~0:.,'06,.,'<)/1718,~,'87.~N 3962.05 E 41~6,87 N 7[~ 17 E' 0.75 10600, 23 0 N 74 0 E J00. 9252.59 4176.45 9181,59 J201.31 N 4000,67 E 4177.14 N 7~ 1'7 E 1.55 -"1-0650'~- ......... 22 ...... 1'5-'N'"74 .......... :'O'-'"E ................ 50-~" 9298'-i-74 ............... 4J 95i'68 ............. 9227,'74 ....... 1206'~"61-N ........... 401'9-'~'-'l"6-E-:-'4'J"96-'i-'37 ...... N"--7~-"17 E J, 50 ..... :'ROJECTED TO TD 10765, 22 15 N 74 0 E 115, 9405,18 4239,20 9334,18. 1218,61N.'i:'406J,O,2 E?,i.::4239,91 N 73 18 E FINAL CLOSURE - DIRECT'ION; DISI'ANCE; N 73 DEGS 17 HINS 49 SECS E 4239.91EEET . . . . ) :_-:'! . .... ................. DS--1-zP,---WEI:L:-NO'; .......... I"3-Gi'IS ...... ? .............................................. ~OB-NO .~ ..... AO?J821}040~' ....... - '-- .:' ............ ; ~':" PRUDHOE BAY, NORTH SI.OPE, ALASKA GHS, 0-]0650 HD, SURVEYORI D FEFFERKORN ;:.lATE RUN: 03-HAR-82 OAMER'A-NO',*.-"1488 .........................(.,YRO- NO: ..... /¥~.--~, -':>~ 5-90 ]:lEG. A/IJ NO.* ]135 fl8 14, WELL NO; 15 ONS ' ,.lOB NO; A0:~828040~,., '~' "~:?'~!"TIHF. ' DATE :'RUDHOE~'~'BAY, .... NORTH SLOPE, ALASKA ----~-ffARKBR ....... TRUE - NAHE ...... DEPTH DEFTH BIFF ., FEET F'EET FEET FEET FEET ' FETE T I) N ..' TOP OF SADLEROCH1T 10044 O0 87~,:,17 12~1 8 868~ ~7 11~0 92 N ~76~,23';'E 3~,.~,24 N 73 18 E O/W CONTACT 1041~,00. ~086,67 ~33~,~ ~015,67 1179,78 N 3~2~,07'E ... 4~02,~7 N 73 17 E PBTD ~.' ~'.-~' .'.:- : 10721,00 9~64.45 1356.5 929~.45 1214.02 N 4045,00;~:E'~'~t.~:4223.25~ N 73 18 E - TD .~.~ 10765.00 9405,18 13.,9.8 9334,18 1218,61 N 4061,02E ,~-, '~4239',91.. N 73 18 E / Eastman / ~ , Whipstock l)~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTiON~4L SURVEY ARCO ALASKA, INC. COMPANY DS 14¢ Well ~umber: 13 WELL NAME Prudhoe Bay, North Slope, Alaska LOCATION JOB NUMBER TYPE OF SURVEY DATE A1081D0074 SURVEY BY D LeJuene Directional Single Shot RECeIVeD ~-_,ov-~ DECO 8 ~ka 0il & Gas Cons. Anchoraga OFFICE ~aska Eastman Whipstock A PETROLANE COMPANY P. O. Box 4-1970~Anchorage, Alaska 99509/(907) 349-4617 November 12, 1981 ARCO ALASKA, INC. P.O. Box 1479 Anchorage, Alaska 99510 Well Number: DS 14-13 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Directional Single Shot Date: il-Nov-81 Method of Computation: Radius of Curvature Surveyor: D LeJuene Job Number: A1081D0074 Attn: Bob Hines Dear Mr. Hines, I am enclosing the original and one copy of the Directional Single Shot Survey run on the above mentioned well. We wish to take this opportunity to thank you for calling on our services and trust that we may continue to serve you in the future. Sincerely, ES Di~idt Directional Driiling Coordinator RJ/bb cc: file enclosure Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwid~ ~RCO ALASNA,? INC. ..... ' ...... ~ ....... ' DS 14~ WELL NO; 13 riSS JOB NO; AA1"O81D0074 F'RUDHOE BAY, NORTH SLOF'E, ALASKA [oS, 0-9845 ~4D, DRILLER; D LEJUENE RIG: F'AR~{ER 191 DECLINATION; 30 1/2 DEG EAST VERTICAL SECI'ION C'.ALCULATE~_~'.:IN PLANE -OF PROPOSAL ' ~i'~' ~!':' -i?~ !~.,~' ~'~ . DIRECTION~ ~N~72 DEG, RECORD OF SURVEY RAI';IUS OF CURVATURE METHOD ALASKA, INC, , WELL NO; '17 DSS :'RUI)HOE BAY, NORTH SLOPE, ~L~SKA JOB NO; AA1081D0074 ..' COt'IPUTATION PAGE .TIME .......... I)ATE 15,' ~1 ,'48 12-NOV-81 TRUE · .q · ", DOGLEG ~EASURED DRIFT DRIFT COUR..E VERTICAL VERTICAl. SUBSEA R E C T A N G Li L. A R C L. 0 S U R E [EFlH ANGLE DIRECTION LENGTH DEF'TH SECTION I'VD C 0 0 R 0 I N A T E S r_~ISTANCE OIRECTION SEVERIT'~' FEET D M rJ M FEEl' F'EET FEET FFET .................. F'E:ET .............. FEET ............ D M .... DG/IOOF1 O, 0 0 0 0 O, 0,00 0,00 -71,00 0,00 0·00 ' 2750, 0 0 0 0 2750, 2750,00 0,00 2679,00 0·00 0,00 287~ 4 45 S 78 0 E i2~ '~ -' '~" · · · ' , · ~872,86 4,42 ..801 86 1 06 S 4 98 E 2975, 6 70 N 86 0 E 122, 2994·27 15,49 2927·27 1·89 S 16·87 E Z119. 8 0 N 84 0 E 124. Sl17.27 70.76 S046.27 0.57 S 72.46 E ~242, 10 15 N 79 0 E S357, 1S 45 N 62 0 E ~414, 15 O'N 58 0 E ~477, 17 45 N 56 0 E S570, 21 15 N 59 0 E 127. S278.71 111. S747·27 61. S406.75 67. 7466.79 97. 7554,44 50.00 S167.71 72.98 S276.27 87.78 ~75.75 104.91 3795.79 1S4.92 S48S.44 0.00 0 0 0.00 0.00 0 0 0.00 5.10'" S '78 0 E S.86 16.98 S 87 S6 E 1.91 Z2,47 S 89 4 E 1,23 2,76 N 51·75 E 51·80 N 87 24 E 10,07 N 7~,42 E 74·10 N 82 1S E ~ ,5 17,60 N 86,53 E '" 88,30 .... N 78 ~0 E .... 2,62 27,27 N 101·42 E: 105,03 N 74 57 E 4,46 4~,95 N 127·60 E 1~4,96 N 71 0 E ~,91 7895. 26 ~0 N 67 0 E 4298. 72 15 N 64 O'E 4695. 78 ~0 N 69 0 E 5722, S9 0 N 72 0 5870, S9 15 N 77 0 E 6116. 40 SO N 76 0 E ~uo9 44 0 N 76 0 E 7090. 47 SO N 75 0 E 7706. 40 0 N 74 0 E 8208. S6 15 N 74 0 E 8585, S4 15 N 75 0 E 9015, 71 15 N 76 0 E 9847, 28 S0 N .77 0 E 725, -.=Z851,57'-:.~:~267,87 S780,57 107,68 N 242,58 E 265,41 N 66 4 E 407,.?4202,57 '-.459,167~ 4~.Z1*57 195,85 N 419,42 E 462,89 N 64 58 E S97,:~"!74526,11. ~-:~ ~687,65.~-4455;~1.1~;- 287,42~-N:~:'~i 670,02 E 692,48N 65 29 E 627, i~ 5015,11 1079,87 49,14,11 418,41i'N !!999,91 E 108~,92 N 67 18 E =' ~ 514,80i~N 1~05,61E 140~,44 N 68 29 E 508,.. 5409,19 .1400~41~' ~8,~19 ~i-~, .~ ~ ........... 1.69 1.47 1.73 0.71 0.13 286, 5628,68 1587.,,60 5557,68 '567,79 N 148-~,...8 E 1585,88 N 69 11 E 0,80 447, 5956 ~ 880 .'-.o ,- =' · ~4 I,77 ~,.~85,54 ~S.,,84 N 1771,25 E 1881,92 N 70 15 E 0,79 . 571, 6~40,12 2247,77 6269,12 727·77 N 2126,77 E 2247,81 N 71 7 E 0,16 , 7,.~,62 877,77 N 521,94 E 2657,72 N 71 S8 E 0,58 616 6799.62 2657.17 6' ~ 2 502· 7194,45 ~966,89 7127,45 922 78 N 2819 80 E: 2966·95 N 71 5S E 0,75 ....................................... S77. 7502.71 7184.29 74~1.71 980.92 N 7029.46 E 7184.71 N 72 4 E 470. 7867.92 Z416.51 7792.92 1079.16 N S'~"'4.64~., E S416.51 N 72 18 E 8~ 8581.82 S828.54 8510 82 1149 S6 N S651.99 E S828.59 N 72 72 E 0·05 0,71 0.78 FINAL CLOSURE - DIRECTION; DISTANCE: . N 72 DEGS S1MINS 49 SECS E ~828,59 FEET DRIFT CHART'S RELAI'EI)DA'f'A FIL. E . · .~RCO ALASKA, INC, :IS 14, WELL NO; 1;S DSS ::'RUOHOE BAY, NLRTH ,.,LOFE, ALASKA JOB NO~ AAlOS~DO074 ..................................... ~tJRVEY FILE NUMBER{ ' 188 DEF'TH 0o00 2580°00 3292,00 3640,00 4765,00 5900,00 6629,00 9920,00 BOI'I'OH HOLE ASSEHBLY VALUES USED FOR DEF'TH ARE Ml:l DESCR I F'T I ON SLICK ASSEMBLY JETTING ASSEHBLY;~.? ANGLE: BUILD ASSEMBLY F'ACKED HOLE ASSEMBLY- PACKED HOLE; ASSEMBLY PACKE:D FIOLE ASSEMBLY DRILLING DAYS VALUES USED FOR OEF'TH ARE MD DAY DEF'TH 1 2 3 4 5 6 7 8 9 10 11 12 1S 14 15 16 17 D E P T FI 1500.00 2610000 2810,00 3~3.00 3640.00 5760.00 6187,00 ~840.00 7955,00 8517.00 8891,00 9S9S.00 9903,00 9920,00 9920,00 9920,00 9920.00 WEIGHT ON BIT WEIGHT IS GIVEN PER 1000 VALUES UoED FOR DEFTH ARE; F'OUNDS MD WEIGHT 0,00 2580.00 3292.00 3640.00 4765,00 5900,00 6629.00 9920.00 65,00 140.00 0.00 65,00 65.00 60.00 0,00 55,00 RE:VOLUTIONS PER MINUTE VALUE:S USE:O FOR DEF'TH ARE MD DEF'TH R.F'.M. 0.00 2580.00 3292.00 3640.00 4765,00 5900.00 6629.00 9920.00 140,00 140,00 0o00 140,00 140o00 140o00 0.00 120,00 DS 14I. I , 'NORTH_; SLOPE., t ~ 5001FEET TBR:.MB (DEPTH 9843 HD. NORTH 1149.35 ERST 3651;99' ', N 2 31 ;'..-.LL__; £ )o 6o , .. j4o I '. ~-' 270 - ...IETTIN6' :R$$EIdBL¥ '''I .~' -i .- , 3/4. BYNI::I. I .... '~ D: flN6LE BUILD R$$EI'IBL¥ I:. 1' ' ' ~ ...... r .... t--- rt ..... E: ?I::~KED HOLE R3$EI"iBL¥ ........... '-7' .........~Z-':': _-7- B-" ...... PI:tCKEB HI:A.E R~SEI~..BLT ..... Eastman/ I Whipstock A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO ALASKAr INC. COMPANY DS 14 Well Number: 13 WELLNAME Prudhoe Bay, North S!ope,.Alaska lOCATiON JOB NUMBER A0382G0405 SURVEY BY D Pefferkorn TYPE OF SURVEY Gyro Multi Shot DATE Eastman Whipstock A ~ TROLANE COMPANY P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 349-4617 March 22, 1982 ARCO ALASKA, INC. P.O. Box 360 Anchorage, Alaska 99510 Well Number: DS 14-13 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Gyro Multi Shot Date: 03-Mar-82 Method of Computation: Radius of Curvature Surveyor: D Pefferkorn Job Number: A0382G0405 Attn: Bob Hines Dear Mr. Hines, We are enclosing the original and sixteen copies of the Gyro Multi Shot Survey run on the above mentioned well. To date, the following distribution has been accomplished: A. 1 copy telecopied to E/W North Slope office for delivery, to ARCO field representives. B'''16 copies delivered to drilling for in-house distribution. C~ ,,,,,3~,. copies for E/W permanent well files. We wish to take this opportunity to thank you for calling on our services and we trust that we may continue to serve your needs in the future. Sincerely, District Operations Manager ST/bb cc: file enclosure Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide ARCO ALASKA, ~(N.C. :~i ......DS 1'4"~ ........ WELL .....NO: ..... !~"'GkiS :.".IOB"-'NO: ........ ~(t,~82G0405 i' PRUDHOE BAY, NORTH SLOPE, Al_ASEA i' GMS, 0-10650 MD, SURVEYOR; D PEFFERKORN DATE RU~: O~-HAR-82 ~'.' ...................... C'AMER'A-~-NO'~ ......... 1"a88 .................................... GYRO~"NO ~ '628, ..... 6'22 ~;~ .............. '~"FORESIGHT': N41- 30E [ . RECORD OF SURVEY RADIUS OF CURVATURE ME'I'HOD [iS 14, WELL NO; 1S GMS JOB NO; 'AO382G0405 TIME DATE ~RUDHOE--'BAY'~ ...... NORTH' SI:OPE, ALASKA 13; 57; 58 ..... 22-MAR-82 TRUE T COURSE-'VERT~CAIz VERTtCAt~ ...... SUBSEA .... R-E-'----C----T--A---N---G--U-~:-A-'R c ~ 0 S U R---E ............ DOG~EG-- DEPTH ANGLE DIRECTION LENGTH DEF'TH SECT]ON TVD C 0 0 R D I N A T E S DIS'lANCE DIRECTION SEVERITY' FEET D M D M FEET FEET FEET FEET FEET FEEl D M DG/100FT O. 0 0 0 0 Oo 0.00 0.00 -71.00 0.00 0.00 0.00 0 0 0.00 100. 0 1~ S 67 0 W 100. ~00.00 0.22 : -, - 29.00 0.08 S 0.20 W 0.22 S 67 0 W ............ 200'~ ............... 0-~5-"S t4 ...... O'W ....... t'00~ ........200.00 ...... : ...... 0,57 ................ t'2'9,'00 ................. 0~-40-"S .............0'.47 W .... 0.-62 ....... S'"-49-'27'"'W ........... 0,'2'2 ..... 300. 0 ~5 N 45 0 W ~00. 300.00 0.93 ~9.00 0.50 S 0.82 W 0.96 S 58 34 W 0.44 400. 0 30 S 83 0 W 100. 400.00 -1.44 329.00 0.29 S 1+42 W J.45 S 78 16 W 0.40 500. 0 0 0 0 100~ 4e~.ee -1.87 428.ee 0.35 s 1.85 w ~.88 s 7~ 21 w (~--~0 600o 0 0 0 0 100. ~.~+~ -1.87 528.~ 0.35 s 1.85 w 1.88 s 7~ 21 w (...~0 .................... ?00~ ............. 0'i'5'S 84 O-W ]00~ 699,'99 ............ 2~08 .............. 628'~99 ............. 0~'37--'S .......... 2.07'W 2.10 .... S'-7~ 50'W .........0.'25 800. 0 15 S 51 0 E 100~ 7eg.ge -2.28 728.e9 0.70 s 2.~7 w e00. 0 ~5 s 75 0 E 100. 8~.~ -1.~7 828.ee o.eo s 1.78 w 1000. 0 ;30 S 7] 0 E 1100. 0 15 N 87 0 ~ ........... 1'200-~ ........... 0'-45---N 64 -- 0 E 1300. 0 30 N .1 0 W 1400. 0 30 N 87 0 W 1500. 0 45 S 7.% 0 W 1600. 0 45 S 68 0 W ...... :J"700~ 0'4~'S 3~ 0 E 1800. 0 45 S .3 0 E 1900. 0 30 S 82 0 E " 2000. 0 ~0 N 65 0 W 2100. 0 30 N 76 0 F_ .......... 2200'~ I O' S 89 0 E 2~00. 0 45 S 59 0 E 2400. 0 45 S 7 0 E ~.00. 0 30 S 2 0 W 2600. 0 30 S .~ 0 W ....... 2?-00 ~ ......... O'-':30 S 4 0 F. 2800. 2 ~0 S 73 0 E 2900. 5 0 S 78 0 E 100. 999 99 -~.43 928.99 1.09 S 1.:15 W ~00o 1099. 1.18 S 0.51 W I00. 1299.98 :0.81:::":::: 1228.98 0.08':S ::0*87 E 100~ 14~. ~7 -0.61 N 0.76 W -' - ~5 ,96 0.08 S 1.99 W 100~ t699~95 -2.56 '1628~95 ]-.J7-S 2.31 W 100~ 1799~94 -2~5~ 1728~94 2,39 S 1.89 W ~.00~ ~899.94 -2.1J J828.94 ~.13 S 1~21 W 2.28 S 72 7 W 0.46 : 1.99 S 63 17 W 0.10 .8 S 46 40 W 0.25 1.28 S 23 17 W 0.28 1.02 S 19 -5 £ 0.53 ..... 0.88 S 84 44 E 0+70 0.5~ N ~3 ~4 E 0.68 0.84 N 64 39 W 1.~ S 87 44 W 0.07 3.05 S 38 20 W 0.4! I00. 1999~9~ -1.77 1928.9.3 2.55 S !.04 W 100. 2099~93 -.I~5] 2028.93 1.89 S 0.98 W 100. 2199~ 92 -'~' '~ ~ ~ JO0~ 2299~91 1.03 2228.91 2.16 S 1.77 E t00. 2399.90 ].S6 2328~90 ~.22 S 2.46 E 100~ 2499~89 1.07 2428~89 4~S0 S 2.~. 1 E 100~ 2599~89_ 0~76 2528.89 ..~18 S ...9~45 E 100~ _~699~89 0~49 -'2628~89 ...... 6.'05 S ~4...~ E- 100~ 2799~85 1~36 2728.85 7~97 S 3~98 E 100~ 2899~62 6~89 2828~62 9.61 S t0~S~ E 2.76 S 22 10 W 0.99 2.12 S 27 21W 0.94 ~,77 S 10 ~ E 2.79 S 39 2~ E 0.51 4.05 S 37 24 E 0.66 4.98 S 30 1~ E 0.27 5.73 S 25 22 E 0,03 6.52 S 22 ] E 0.08 8.91 S 26 S1 E 2.37 14.09 $ 47 0 E 2.52 DS 14. WELL NO.' 13 GMS JOB NO**. A0.$8260405 TIME DATE F'RU~DHOE-BAY~ .... NORTH 'SE'OPE~ ...... AIZASKA 13;57158 .... 22-MAR=82 TRUE MEA~SURED-XBRIFT ............. DRIFT ............. COURSE-VERT'ICAI, VERTICAIZ .... SUBSEA .... R'E'C'-T--A-~N-G-'U"E'A R C L 0 S U R E ........ ~;OGI;EG'7 OEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S D~(S'FANCE DIRECTION $EVERIT~i FEET D M D M FEET FEET FEET FEET FEET FEET D M DG/iOOFT 3000. 7 0 N 87 0 E ~00 2999 07 16 .3 2928 07 10.43 S 20.70 E 3.18 S 6~ 16 E 2°53 3100o 8 30 N 83 0 E JO0o 3098.16 29.68 ~027.16 9.25 S ....... ~200; ...... 9 4o N 81 0 E ..00, ~J96,89 ~': ~45,3] ......... ~'25-;'89 .................... 7,05-'S ............... ~9~"B3 E 50 3~ S 81 57 E ...... 1,"29 3300. 12 30 N 72 0 E 100. ~9...00 64.5~ 3~4.00 2.55 S 68 57 E 68.62 52 24 3400. 15 15 N 56 0 E 100. ~392o07 88.18 ~2J.07 7.93 N 90.05 E 90.40 N 84 58 E 4.70 · 3500. 18 15 N 56 0 E 100. ~487.82 115.85 ~416.82 24.04 N 113.94 E 116.45 N 78 5 E .~0 3600. 23 0 N 61 0 E 100. S581.~8 150.04 ~510.~8 42.44 N 143o96 E 150.08 N 73 35 El L .)6 3700~ 25 .... 0'-'N"-62 .... O'-E ...... I00~ 36'72~'73 190.00 "~601-,7~ ......... 61'~84-'N ............. I79~70 E 190.05 N 71 1E--2~'04 ........ 3800. 25 45 N 63 0 E JO0. ~76~,08 232.24 ~692,08 81,67 N 217.71E 2~2.51 N 69 27 E 0.86 3900. 27 0 N 6~ 0 E 100. ~852.67 276.08 3781.67 101,80 N 257.~0 E 276.70 N 68 25 E 1,25 4000. 28 15 N 6~ 0 E 4100, 30 0 N 63 0 E 4200, .......... 4300. 32 0 N 66 0 E 4400. 33 45 N 68 0 E 4500. 35 30 N 71 0 E 4600. ~7 0 N 71 0 E 100. ...... 3941.27 .$21.85 S870.27 122.85 N 298.61 E .: · 100; 4028.62 ~69~88:: J44.95 N 341.97 E 100:'~: 4]14.90 419J92. 40 .42 E 100~- 4200.27 471.62, 4129.27 . 188.70,:.:N 4~4;79 E 100~: ~4284.25 525~'67 484'.7& E ]000 4366.54 100. 4447.18 4700~ 39-30N"73 O"~-~E ....... ~00, 4525,71 4800. 39 15 N 73 0 E 100. 4603.01 4900. 40 0 N 73 0 E 100, 4680.03 582.42 4295:~,54~i~:7;:~229'~80~,~N 5~7.97 El 641.53 4376.],8 249.05 N 593.88 E 703.43 4454.71 268,--18---N 652.75 E 766.87 45~2.01 286.73 N 713.42 E 830.64 4609.03 S05.38 N 774.41E ~;~2o89 N 67 38 E 371.42 N 67 2 E 421.92 N 66 40 E 473.98 N 66 32 E 528.25 N 66 35 E 1.25 1.26-~ 1.35 2.06 585.00 N 66 52 E 2.44 64~.99 N 67 15 E 1.50 705.69 N 67 40 E 2.79 E 5000. S9 SO N 73 0 E 100. 4756.9~ 894.58 4685.91 324.07 N 8~5.56 E 896.20 N 68 48 E 0.50 5100. 38 45 N 74 0 E 100. 4834.49 957.66 4763,49 341.99 N 896.06 E 959.]0 N 69 7 E 0.98 '5200'~ ~9 .....0"N'-7~ ..... O-'E ........ 100, '~'491'2~4~' 1020,41 4841'~4 ~59~"82'-N 956.23 E 1021.69 N 69 5300, 39 J5 N 74 0 E 100. 4989.92 108~,49 4918.92 377.74 N 1016.73 E 1084.64 N 69 37 E' 0°68 5400. 39 0 N 74 0 E 100. 5067.50 1146.56 4996.50 S95.13 N 1077.39 E 1147.56 N 69 52 E 0.25 5500. 39 0 N 73 0 E 100. 5145.21 1209.48 5074.21 413.0] N ]137.73 E 1210.37 N 70 ~ E 0.63 5600. 39 45 N 73 0 E 100. 5222.51 1272.91 5151.51 431.56 N 1198.~59 E 127~.7~ N 70 12 E 0.75 -5700. 39~--30~N'-73 ..... O~--E .... 100, 5299,53 1336,68 5228,53 ........ 450.20-N 1259,~38 E 13~7,43 N 70 20 E 5800. 39 SO N 74 0 E 100. 5~76.70 1400.27 5305.70 468.27 N 1~20.37 E 1400.94 N 70 28 E 0.64 5900. 40 0 N 76 0 E 100. 5453.58 1464.14 5382.58 484.82 N 1382.1~ E 1464.69 N 70 40 [JS 14~ WELL NO: 13 GMS JOB NO: 'AO382G0405 TIME DATE PRUI)HOE ...... BAY-~ ...... NORTH 'SLOF'E-~ ...... AI;ASKA 13;~5'7~58 22-MAR-82 ............................................... 7'--- TRUE ~'EA'SURE'D'"-'DR'~[ F'-T ................ DR"I F-T- ............. COURSE-'--VERT ICAi - -VERT ICAt~ SUBSEA E'-'-'-C-'-'T----A--N-G---ILI.--L.. A-.-R . _ R C L. 0 S U R-E ......... DOGLE-G--- DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEk~ERITY FEET D M D M FEET FF.~ET FEET FEET FEET FEET D M DG/IOOFT~ 6000. 40 3;0 N 75 0 E 100...~.~.q~-'~°,90 1.~.=8,64 5458,90 ..,00.$~9 N ~444068 E 1529.08 N 70 52 E 0.82 · · · 6100, 40 15 N 75 0 E 100 5606 09 1593;,3;5 5535 09 517.76 N 1~,07025 E 1593,70 N 71 3 E 0,25 .......... 6200"~ .......... 4't .... 1'5'-'-'N"--7'6 .......... O""E ............ "100,- ........ 568:t ,' 84 .1'658 ~'5t ....... 5610'~"84 ........ 53;4","'t0""-N ...... 1'570','-45 E 1658,78 N' '71 13 E ....... 1-,-1-9--: 63;00 4-~ SO N 76 0 E JO0 5756,3;0 1 '~ ~_ ' . ~- . 7.~o,1-~ 5685.3;0 550.25 N 16~5,21 E 1725.3;1 N 71 24 E _1.,25 6400. 43; 15 N 77 0 E 100. 5829,59 1792,97 5758,59 566,13 N 1701,3;7 E 1'79.%,09 N 71 ~6 E 1.01 '500, 44 0 N 77 0 E 100, 5901.97 186~,73; 583;0.97 581,65 N 1768.60 E 1861.79 N 71 48 E 6600, 44 15 N 77 0 E 100, 5973,75 ~9~},11 5902,75 597.3;2 N 1836,44 E 1931,1~ N 71 59 E ..... 6700,- ........ 4'3;----45---N---.74 O--E ......... 100, 6045,-69 2000,46 ....... 5~74,-69 .......... --61-4-,-.7.1 ....... N ........ -1-~P.03; ,- 68 E 2000,47 N -72 6 E .... 2,--1.4 ........ 6800, 44 0 N 74 0 E 100. 6_117,77 2069.73; 6046,77 63;3;,81 N 1970,3;0 E 2069.73; N 72 10 E 0,25 6900. 44 0 N 75 0 E 100. 6189,71 2139,14 6118,71 652,3;7 N 2037,2.4 E 2139,]4 N 72 15 E 0,69 7000, 43; 45 N 75 0 E !00, 6261.79 2208,37 6_190,79 670,31 N 2104.18 E 2208..~7 N 72 20 E 0,25 7100. 43; 3;0 N 75 0 E 100' 6~34 ...... 18 2277,29~' 688,17 N 2]70,83 E -~-77 30 N 72 ~-_.~ E 0,25 ........ 7200-~' ........... 43 ......... 0-N--"74 ...... O-'E ~.00,:~ 6407 ~ ~ : ~':': ' ' ~ .......' ...... ' ' ,0~. .,~4~,~ ~:~ -';, 7~:~:~'~:~'~22S:6,86 E 2345,77 N 72 28 E - 0,- 85 ...... 7300, 42 30 N 74 0 E 100': 6480.45 2413;,&0.~.~640~,45 .... ...7~'~¢7'j"'~'~' ....... ~07,11 E 2413.6~ N 72 S1 E 0,50 7400, 40 45 N 75 0 E 00, &~..,..~ ..0 .~ 79:,97 1~ E ~480,0~ N 72 34 E 7500 4~ ~5 N 74 0 E 100, 6630~67 o~.,.~4.~ 5~ ~ ' ........ 5 72 * · 6.~. 9,67.~': ,~'~760'~4:7~,~N 2429,3~ E 2545 · .. 8 N 37 E 0 · 82 7600. 40 45 N 74 0 E ]00. 6706.J4 2611,10 6635.14 778,55 N 2492,40 E 2611.17 N 72 39 E 0,50 -7'700~ 40 J5-N '74 0 E 100, 6782.18 2676~0J 671'1,18 ...... 796-~-45-'-N ..... 2554,82 E 2676.09 N 72 4! E 0,50 7800, 39 15 N 74 0 E 100, 68..9~ .06 27~9.93 6788.06 8J4,08 N 2616~29 E ..~740,02 N 72 4S E 1,00 7900~ $8 15 N 7S 0 E JO0. 6937~05 2802~50 6866,05 8S1,86 N 2676.30 E 2802,60 ~-~ 72 44 E 8000~ 37 SO N 74 0 E 100, 7015.98 286~,88 6~'44,98 849,29 N 2735,17 E 286~.99 N 72 45 E 0,77 8100, 37 15 N 74 0 E 100 7095 45 ~9~4 ~ · '~ '~ 72 , · ..... ,o. 7024,45 866,02 N 2793 52 E ..9.:4,68 N 47 E 0,25 8200-, .... ~7 O-.N 74 0 E ~00, 7175,18 2984,88 -7-i04,-t-8 ....... 882--,-66-.-N ..... 285-1-.,53 E 2985,02 N 72 48 E 0,2.,-~ 8S00 ~6 0 N 7S 0 E 100 7~ ..... ~. S044 ~5 7184 57 8~,55 N 2~08,56 E ~044~4~ N 72 4~ E 1,16 8400~ 35 30 N 73 0 E 100. 73S6~72 ~102~77 7265.72 ~16,64 N 2~64,44 E 31.02.~2 N 72 4~ E 0,50 8500~ S5 0 N 74 0 E 100, 7418~S~ S160~47 7~47,3~ ~3~.0~ N ~01~.78 E ~160.6S N 72 50 E 0.76 8~00. 34 30 N 74 0 E 100, 7500~55 ~217~44 742~.55 ~48,74 N ~074,57 E ~2~7~62 N 72 51 E 0.50 ..... 8~00~ ...... 34 .... O"N 75 .....O"E ~00.' 7583~21 327~.68 7512~-2~ .............. ~'63"~--~8-'N ......... -31'28'~80 E ~27~.87 N 72 5~ E 0,75 ' 8800~ ~3 15 N 75 0 E 100~ 7666~48 ~S28.~ 75~5.48 ~78.11 N ~182,2~ E ~2~21 N 72 55 E 0.75 8~00, ~1 45 N 75 0 E 100, 7750~82 ~82,66 767~,82 ~2,02 N ~2~4,1~ E 3~82,~1 N 72 57 E 1,50 14, WELL NO.' ]3 GMS JOB Nil;. A0382G0405 TIME DATE F'RUDHOE"'BAY', .... NORTH'--"'SLOPE~ ..... AL'A'SKA 13157:58 ..... 22~MAR=82 TRUE ME~SURED-~RIFT .... DRIFT ....... COURSE-VERTICAI_'-'VERTICAL''SUBSEA ......... R~-'E-'C-'T--A~-N~-U-'L'A R~ C L'O S~'U'R-E ........... DOGE~EG- DEPTH ANGLE DIRECTION LENGTH DEPTH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION SEVERITY FEET D M D M FEET FEET FEET FEET FEET FEET D M D6/IOOFT 9000. 30 30 N 76 0 E 100. 7836.42 ~4~4.26 7765,42 1004.~6 N 3284.23 E ~434.54 N 72 9100. 30 0 N 76 0 E ~00. 7~22.80 3484.53 7851,80 1017,]5 N 3333.11E 3484.85 N 73 2 E 0,50 ..... ~200~ ...... 28~'~5-N'-'~7~--'O'-E ..... I00~ ........ 8010~15 ....... 3533.10' 7~3~'~15 ...... 1028~'~2-N 9300. 28 15 N 76 0 E 100. 8098.24 ~580.33 8027.24 1040.37 N 3426,26 E ~580,73 N 73 7 E 0.00 9400. 28 15 N 76 0 E. 100. 8186.3~ 3627.56 8115.33 1051.82 N 3472.18 E 3628.00 N 7~ 9 E 0.00 9500. 28 0 N 77 0 E 100. 8274.52 3674.57 8203.52 1062.83 N ~518o02 E ~675.06 N 7~ 11E 0-~ 9600. 28 30 N 77 0 E ]00. 8362.61 ~721.73 829].61 1073,47 N 3564o14 E ~722.29 N 73 14 E --~V700-~ .......29 ......... 0~-N-~7'5 ....... O-'E ........ ]00~ 8450.29 3769.73 8~79,29 ...... 108~1~1 ...... N ~800. 28 ~0 N 75 0 E 100, 8537.96 3817o77 8466,96 1077,56 N 3657,27 E ~818.41 N 73 18 E 0.50 V900, 28 45 N 73 0 E 100. 8625,74 3865.66 8554.74 1110.76 N 3703.32 E ~866.31 N 73 18 E 0.~9 10000. 28 45 N 73 0 E 100o .......... 8713o41 3913.75 8642,41 1124.83 N ~74~,~2 E 3914,41 N 7~ 18 E 0o00 10100. 27 45 N 73 0 E 100;~ ~i 8801.50 3961,08' 8~,30'~50!~-~i~:~.1138.67 N ~7~4o58 E 3~61.74 N 73 18 E 1,00 "1'0200"~ ...... 27 ........ 0-"'N--'"73 ......... O""E ]00~ '8890.30 4007.0& 88I~i~;'30_ ~'1] .... .,.,~= E 4007.72 N 73 18 E ' 0.75 ..... 10300. 25 30 N 73 0 E 10~;!: ..~i8979.98 4051 28 ~ . 8908.98 ~]].6~.04~N ~880~,85 E 4051.95 N 73 17 E 1.50 10400. 25 15 N 73 0 E 100~ ~.070.34 4094.13' 8999'~3417~'!~~N~ ~.8~ E 4094,80 N 73 17 E 0.25 10500. 24 30 N 73 0 E 100. 916].06 4136.19 9090~.06 .1189,8~'~N 3962.05 E 4136.87 N 73 17 E 0,75 10600. 23 0 N 74 0 E ~00. 9252°59 4176.45 9181.59 1201.31N 4000,67 E 4177.14 N 73 17 E 1.55 'I0650; 22"~'-~5'~N"'-74 ..... O-~'E ........... 50~ · 9298.74 4195.68 9227.74 1206,61~ N 40'19,16 E 4~96.37 N 73 17 E 1.50 F'ROJECTED TO Tlr; 10765. 22 15 N 74 0 E 115. 9405.18 42~9.20 9334.18 1218.61 N 406].02 E 4239.91 N 73 18 E 0.00 FINAL CLOSURE - DIRECTION; DISTANCE: N 73 DEGS 17 MINS 4~ SECS E 4239.~1 FEET ARCO ALASKA, INC~ PRUDHOE BAY, NORTH SI.OPE, ALASKA GMS, 0-~ 0650 MD, SURVEYOR; D PEFFERKORN DATE RUN** O~-MAR-82 ........... OAME'RA~-NO"~--I"488 ............................. ~"GYRO'-NO ** ...... 6'28, ..... 622 5-90 DEGo A/U NO; ]135 ................... FOREStGHT-~---N41 JOE .......................................................................... DS 14, WELL NOI 15 GMS JOB NO;. AO582G0405 TIME DATE F'RUDHOE-"BAY'~ ...... NORTH-'SLOPE~ ....... AIi'ASKA .................................................................... :- 1'4';'0;~'t'0~' ...... 22~M'AR=82 ........................................... MARKER ....... TRUE SUBSEA ................................................... C 0 ~'~E ............................................... M E'iq'S URE~D-VERT"~"C'At ...... N D"- T V D'--"VE_ R T'I CA k R - E-_ 'C" 'T---A'~'N '- G .................................... U [ A R C'- [-"0- S'" U'-R'~ E .............. VERT~I'CAL ....... NAME DEPTH [;EF'TH DIFF DEPTH C 0 0 R D I N A T E S [~ISTANCE DIRECTTON THICK~ESS FEET FEET FEET FEET FEET FEE T 7.'; H TOP OF SADLEROCH1T 10044.00 8752.17 ~_2~.8 868~.~7 11~0.92 N ~769.2~ E ~5.24 N 7~ 18 E O/W CONTACT 10418~00 ~086~67 ~JJ]~ ~015.67 117~.78 N ~2~.07 E 4JO2.J7 N 7J t7 E BASE-'-OF'""SADE~'ROCH'I'T ............ ~0'6~-~-0 .... 9~-~'0'-;'77 ...... I"~52 ;-2 92~9 ~-77 -- -I 207 ;-'9'6-"N-'4'02~ ;--89'-'""E ................. -420 I"~ 29 ........ N'--7~ 1- 7 E ......... F'BTD 10721.00 ~J64.45 1J56.5 ~2~S.45 1214.02 N 4045.00 E 422J.25 N 7~ 18 E TD 10765.00 9405.18 1359.8 93~4.18 1218.61 N 4061.02 E 42~9.91 N 7~ 18 E j, I 1 RTl- '-I · -- Suggested form to be i~ertcd in each "Active" well folder to d~eck for timely compliance with our regulations. N/ r/3 ' ' O~2rator, Well Na~ and Reports and Materials to be received by: ./ ~ -- / ~ '~/ Date Required Date Received Remarks -- - _ Ccmpletion Report Yes / ~--~. ' Well History Yes Samples ~re ~ips Core Nscription Inclination Su~ey ~d Drill Stm Test Re~S Pr~u~i°n T"t~e~r~~'~ ~s R~'": ' Yes Digitiz~ ~ta~ ARCO Oil and Gas~r~' 'mpany North Alaskl~ ~istrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer December 8, 1981 Reference: ARCO 'OP~F.N HOLE~.?.%NALS D.S.14-13 11/8/81 Computed 4-Arm Diplog Run 1 2"/5" D.S.14-i3 11/8/81 Hi Resolution 4-ArmDipmeter Run 1 5" ~e sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal Cf 808 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PH~LLIP °'~""? ' ..ECEJVED MARATHON ~askaOil& GasCons. Commissio~ CHEVRON Anchorage ARCO Oil anti Gas Company ~s a Division of AttanticR~chfietdCompany ARCO Oil and Gas Company North A!ask~ "~is~rict Post Office {t, 35(; Anchorage. A!aska 9951.0 Telephone 907 277 F:637 Jerry A. Rcchon District Operadons E:]gineer DeCember 3, 198~i Reference: ARCO DIRECTIONAL SURVEY UATA D.S.ll-2 ~ 10/6/81 Gyroscopic .D.S.13-8~'/ 11/5/81 Gyroscopic D.S.14-16~ 9/~/81 Gyroscopic Job No. A1081GO052 Job No. Al181GO097 Job Noo A981GO014 D.S.13-9L/ 11/13/81 Single-Shot D.S.14-13~ 11/12/81 Single-Shot Job No. A1081DO088 Job No. A1081DO074 Please sign an~d return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 793 DISTRIBUTIO~ NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO Oil a'ld gJs Cort~pany ~s a girls,on o' ;,llaohcR~chtieloCompany EXXON MOBIL GETTY MARATHON DECO 8 1981- CHEVRON Alask~Oil & Bas Oons. Com~issio~ Anchbrage ARCO Alaska, Inc. Bo 'a(~' Past OffiCe 0 Anchorage, Al . I 99510 Telephone 907 277 5637 November 25, 1981 Mr. Hoyl e Hamil ton State Of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS ll-3 DS 15-11 DS 12-14 DS 14-12 DS 13-8 DS A-7 DS 1'4-13 DS lA-9 DS 14-14 DS B-8 DS 14-15 DS B-9GI Dear Sir' Enclosed please find the following: (1) The Completion Reports for DS 13-8, DS 14-14, DS 14-15, DS 15-11, DS 15-12, DS A-7, DS lA-9 and DS B-8. (2) The Monthly Drilling Reports for DS 11-3, DS 12-14, DS 14-13, DS 15-12, DS lA-9 and DS B-9GI. Sincerely, P. A. VanDusen District Drilling Engineer PAV' GA: 1 tc Enclosures ARCO /',tnska. !nc is a subsidiary c~f AllanlicRic. hliridCornp~ny STATE (JF ALASKA ' ALASKA('6 AND GAS CONSERVATION cd~~ MISSION IONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [] Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 81-101 3. Address 8. APl Number P.O. Box 360, Anchorage, Alaska 99510 so_029-20624 4. Location of Well at surface 1402'S & lO19' of NE cr Sec. 9, TION, R14E, UM 5. Elevation in feet (indicate K~B, DF, etc.) 6. Lease Designation and Serial No. RKB 71' ADL 28312 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. DS 14-13 11. Field and Pool Prudhoe Bay Field Prudhoe 0il Pool For the Month of October ,19 8] 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well @ 1900 hfs, 10/26/81. Ran & cmtd 13-3/,8" csg. ~nd dril[led 12¼" hole to 3640', as o¢ 10/31/81 See Attached Drilling History 13. Casing or liner run and quantities of cement, results of pressur9 tests 20", 94# H-40 conductor to 110' 13-3/8", 72# L-80 csg to 2581'. . Cmtd w/3OOsx Permafrost Cmtd w/3OOOsx A.S. III and 400sx A.S. II. See Attached Drilling History 14. Coring resume and brief description N/A 15. Logs run and depth where run None to Date 1 6. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing 4rue and correct to the best of my knowledge. iSiGNED ~~ "~,",'~,'~'~ TiTLESr. Drilling Engineer NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 DS 14-13 - Drilling History - NU 20" Riser. Spudded well @ 1900 hrs, 10/26/81. Drld 17½" hole to 2610' Ran 63 jts 13-3/8" 72#/ft L-80 csg w/shoe @ 2581' Cmtd 13-3/8" csg w/3OOOsx A.S. III and 400sx A.S. II. ND 20" Riser. InstlJ 13-3/8" pack-off & tstd to 2000 psi-O'K. NU BOPE & tstd to 5000 psi-OK. Tstd csg to 1500 psi-OK. Drld FC & cmt. Tstd csg to 1500 psi-OK. Drld FS & 10' new form. Tstd form to 12.5 ppg. EMW-OK. Drld 12¼" hole to 3640', as of 10/31/81. ARCO Oil and Ga mpany North Alaska Disiric[ Post Office 8ox 360 Anchorage. Alaska 99510 Telephcne 907 277 5637 Jerry A. Rochon District Operations Engineer December 3, 1981 Reference: ARCO OPEN HOLE FINALS D.S.14-13 11/13/81 DOS.14-13 11/12/81 D.S.14-13 11/8/81 D.S,14-13 11/12/81 D.S.14-13 11/14/81 Compensated Densilog Compensated Densi/Neutron/GR DIFL Induction Log Prolog(Sandstone Analysis) Run 1 Run 1 Run 1 Run 1 5t! 5" 2" & 5" 2" & 5" ,! Note: 4-Arm diplog to follow as soon as I receive fron Dresser. Please sign and return the attached copy as receipt of data. Mary Fo Kellis North Engineering Transmittal # 791 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL GETTY PHILLIPS SOHIO MARATHON CHEVRON and ('].is Company ts a giws~on of AtJant~cRJcnfieidCompany ALASKA OIL AND GAB CONSERVATION COMMISSION Hoyle H. Hamilton Chairman Commissioner Doug Amos Petroleum Inspector November 2, 1981 Witness BOPE Test on ARCO's DS 14-13 Well, Sec. 9, T10N, R14E, U.M. Permit No. 81-101 on Parker Rig No. 191 Thursday. October_ 29, 1981 - I traveled this date from I-~abors Rig '~E' t~'"~arker Rig I9~, to witness the BOPE test. The test commenced at 7..00 a.m. and was concluded at 9:45 a.m. There were no failures and I filled out an A.O.G.C.C. BOPE test report, which is attached. In summary: I witnessed the successful BOPE test on ARCO's DS 14-13 well. I filled out an A.O.G.C.C. BOPE test report, which is attached. O&G ~ 4 4/80 ._ rA,l., ~i~ AI,ASKA KA OIL & GAS CON:~E!<VATIO[~ COMHI ION B.O.P.E. Insl'~ection Report Inspector Operator ~v~c,O Well I2).~. I~- I_~'; . Location: Sec ~ TIOM R IJ,.~ tl tA.t.A, Drilling Contractor ~~v~ Location, General' %;ell Sign General tiousekeeping Reserve pit Rig Representative ~.-c>, '." ¢ ~,] la'~ I Permit # ~:>1- I01 ~ {~Casing Sut ~ ~,~ ft. Rig # %~ ~ ~epresentativ~~~ ~,~ ~ ... [; ................................ -.=--.. ,' ACCiJ~ILJI~,TO R SYSTEH ~Full Charge Pressure ~O,,")~ psig ,, PreSsure After Closure ]~'~0 psig '~200 psig. Above Precharge Attained: rain ~ ~Full Charge Pressure Attained: + min~ sec COntrols: gas~er~ Remote 0~_' Blinds switch cover BOPE Stack Test Pressure KellZ ao_d_F!.gp__r__S_a._[_e__t.-lf Valves Annular Preventer / ~ D,~9OO iiUpper Kelly } /Test Pressure Pipe Rams ~t_ ~ ~,~O~O Lower Kelly .] /I'est Pressure !, Blind Rams I ' Ball Type I 'Pest Pressure Choke Line Valves~ %' " , Inside BOP ~ Test Pressure -~-~- I H.C.R. Valve V/ I " I Choke Manifold I -~st Pressure U ~.~-" Kill Line Valves ~0 ?" I· "i NO'. Valves. ~_~__ Check Valve %/ I I ' No. flanges ' / Adjustable Chokes~- '2- ' ' ' t~ I{ydrauically operated cho~c' ~J(l%-'s:~-i-~l:~==~J-&-:e:~'' .... -::~-:~,--S'~ ................. -~:?'L--~'~'~--' ..... ~ ...... '~-i{~'s ....... - a'~ ...... :"- Repair or Replacement of failed equipment to be made within .days and Inspector/Commission office notified, t~-~..~ Remarks Distribution ., orig.- - AO&GCC cc - Supervisor Inspector " July 13, 1981 Mr. Pj A. VanDu~n District Drilling Engineer ARCO Alaska, Inc. P. O. Box 360 ~chorage, Alaska 99510 Re: Prudhoe Bay Unit DS 14-13 ARCO Alaska, Inc. Permit No.. 81-101 Sur, Loc.~ 1402'S, 1019'W, of NE cr Sec 9, TiON, Ri4E, UM. Bottomhole Loc'~ 118'S, 2287'W of NE cr Sec 10, TiON, R14E, UM. Dear Mr. VanDusen ~ Enclosed is the approved application for permit to drill the above referenced wel 1. Well samples and a mud log are not required. A directt~onal survey is required. If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.50.870 and the regulations promulgated thereunder (Title 5, AlaSka ~ministrative Code). Prior to commencing operations you may be contacted by the ~abitat Coordinator's office, Department of Fi~ and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to Mr, P. A. VanDusen Prudhoe Bay Unit DS 14-13 -2- July 13, 1981 commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a repre- sentative of the commission may be present to witness testing of blowout preventer equipment before surface casing shoe is dri 1 led. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very trUly yours, ~arry W. Kugler/ Commissioner of ~ O~D~ O~ TH~ CO~,~:~IS~ON Alaska Oil & Gas Conservation Co~ission Enclosure ~ cc~ Department of Fish & Game, ~abitat Section w/o encl. Department of Environmental Conservation w/o/encl. ARCO Alaska, Inc.( Post Office I~,~ 360 Anchorage, Alaska 99510 Telephone 907 277 5637 July 6, 1981 Mr. Hoyl e Hamilton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Subject: DS 14-13 Dear Sir: Enclosed please find: 1. The Permit to Drill application for DS 14-13. 2. The. $100.00 application fee. 3. The horizontal & vertical wellbore projections. 4. A preliminary as-built drawing. (An updated as-built for Drill Site 14 will be submitted as soon as it becomes available. ) 5. The BOP stack diagram & description. Sincerely, P. A. VanDusen District Drilling Engineer Attachments PAV/HMP:sp RECEIVED Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany A(..' STATE OF ALASKA (i. ALASK ,L AND GAS CONSERVATION C ~MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL IX] lb. Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC [] REDRILL [] DEVELOPMENT OIL ~-I SINGLE ZONE ~] DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inc. 3. Address P.O. Box 360, Anchorage, AK 99510 4. Location of well at surface 9. Unit or lease name 1402'S & lO19'W of NE cr Sec 9, TION, R14E UM ~ Prudhoe Bay Unit At top of proposed producing interval ' RE [E IVE 1 o. we. number 215'S & 2590'W of NE cr Sec 10, TION, R14E, UM DS 14-13 At total depth JUL, 0 9 1~[t11. Field and p°°l ll8'S & 2287'W of NE cr Sec lO, TION, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation ar~;~l~l~ 0~'& Gas Cons. 6mnm~iJi~thoe 0i 1: Pool RKB 71 ' 28312 Anchorage 12. Bond information (see ~0 AAC 25.025) Type Statewide Surety and/or numberFed Ins Co. #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed NE of Deadhorse, AK 5 miles 1320 feet well 2640 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 10721 'MD 9415'TVD feet 2560 November 1, 1981 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures +.'~r~r) psig@ -- Surface KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE +36 o I' (see 20 AAC 25~.035 (c) (2) +-4600 psig@~ft. TO (TVD) Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF 'CEMENT . Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 32" 20" 94# H-40 -- +100 surf i +llO ~l+llO .250 sx PF II to surf. - ~ +-2650 +--2650 Circ to surf-apx 3000., 17½" 13-3/8 72# N-80 BTC +2650 surf .12~4" 9-5/8 47# L-80 & BTC +9680 surf ~ +'9680 11+8575 500sx cmt column On 1., S00-95 - ~ I stage, +300 sx on 2nd stage 8½" 7" 29# N-80 AB .M~O~D, +_1341+_9380 ~9205 +_1'0721 ~+_9415 +400 sx Class G 22. Describe proposed program: or D I L, ARCO Alaska, :[nc. proposes to directionall~v drill this well to 10,721'MD (9415'TVD) to Pro- duce the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8" 5000 psi RSRRA BOP stack will be used. The BOP equipment will be pressure tested each week and oper- ationally tested each trip. A string of 5½" 17# L-80 tubing, packer and necessar~v provisior for subsurface safet~v equipment will be run. A non-freezing fluid will be left in all un- cemented annuli within the permafrost interval. Selected intervals within the Sadlerochit to be perforated and reported on a subsequent report. A 5000 psi~WP wireline lubriCator, tested to working pressure, will be used on all wireline work. The packer will be set abov~ the Sadlerochit. The downhole safety valve will be tested and installed upon conclusion' of job. The 13-5/8" 5000 psi RSRRA BOP stack will be tested to 5000 psi. A surface diverter system will be installed and operationally tested prior to spud at least dail.v thereafter. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNED T~TLEDist. Drilling Engineer DATE The space b~low fo~' Commission use CONDITIONS OF APPROVAL Samples required Mud log required Directional Survey required I APl number []YES (~NO []YES [~NO ~ii~YES []]NOI 50- ~;~- Permit number Approval date .00/.-. /0/ O?/~t3/~l I SEE COVER LETTER FOR OTHER REQUIREMENTS ./ ''1,~ " / / b'y order of the Commission "---' .... Form 10-401 / Submit in triplicate Rev. 7-1-80 i il -- . i~ ~y.~"~ I'~' ~~~ ~.REBY't~ERTI FY THAT '1 AM ' ' ~ T0 PRACTICE LAND SURVEYING IN ~E~ ~ '~ THE STATE 0F ALAS~ AND THAT ~/ . -- ~ ~ ....... ~;..~.. 1~O' ~ ~_~ _ ~ '~. ~-. N,...~277.-S ..'~ ~ .......... ~ .... --~, ~ -.', k~'.. .,- ~-~ ,~, .,,, ~ ~ ~, ~ - . '1 .... .' . ~ . ' 14 , D.S. 13 CONDUCTORS ~-lO . x = 6~7,276.s7 x = 697,3s9.~ .. , LAT = 70°1~'07.06~'' LAT = 70°1~'03.601'' LONG = 1~8o29'20.~k7" LONG .= l~°29'lP,. , . LAT = 70°13'05.910'' LAT = 70°1~'02.~39TM LONG = 1~8°29'20 l~" LON~ = 1~°2~'17 961" 7. Y = 5 931 595.51. I0. Y = 5 931 245.26 .... X : 687,331.97 . X = 687,415.71 LAT = 70°13,O4.755,, LAT = 70°13'01.290'' LONG- 1~~-~ LONG = 148°~'17.228'' i~1 [ Ali,,~RichfieidCompany ~~~ DATE: DRAWING No- NORTH A ME R~~~~"iVIS ION ALASKA DISTRICT-PRUDHOE BAY CASE I SOt. UTION BUILD RA1'E = 2+50 DEG/iO0" BUILD RADIUS = ~....~,1.,83, TVI) [lEV ANULE;~ .... ': ME~' ~! . ' K:I:CKOF:'F DEI":'I"H AT ~00,00 0,00 0,00 2800,00 AN[')LE ESTABLISHED AT 41..., 4 ,, V ~:% ........ ~ ~:; ................................ 4.- ,., '¢ 1~""] ';'~....,, o,,.."~:"~:~' '"" "':' ........ 4.,..~.4, :.,',".:'"':" i ,:"? OB,JECI" I VE: Al' 8971, O0 o~"'"e .,.*. ,:...,, ,..,. 31 .-_'~ · 62,'q 10174,48 ADDITIONAL F'OINT AT 6181,00 1895,07 S5,62 6742,13 ~-~. ADDtl'IONAL ROINT AT 6746,00 2299,94 S5,62 74S7,21 ~.~ ADDITIONAL POINT AT '~;, 38o~00'~ : ~., .~, ~4:~;=~=;:" ~' .......... o..,, o~~;=" ;"'~ ........ 8~4,~6°° ~ · .... ~_~ ADDITIONAL F'OINT AT .... /~:36,.00 3081,00 35,62 , 8778,i7 ~-~ ADD I T l 0NAL' F'O I.~T .AT. 80 ! & ~C'O ~.~09,98 ~.5 t.&2 ......... 8999* 61 ~, , ADDII'IONAL POINT Al' ADDITIONAL POINT AT ~DI. ITIONAL F'OINT Al' :':'.',D[Ii TI ONAL. 'Poi N~~' '~ T ......... ADDITIONAl... POINI" Al" ADI)ITIONAI_ F OINI' AT ADDITIONAL F'OINI' AT ADDITIONAL F'OINT AT ADDITIONAL F'OINI' Al' A D D I A D D I - .~*'- 62 9018,06 8031,00 3220,7¢ ~, TIONAL ........................... F'O I N'l' Al' '-'-3800,67 2:30, ,....., v"' "' ' .<.::, · _ .:,'"' '?' F::"'" ..-',c:,,.t.,..,, ._,...,'-' r.:...,,_.:. ':, .-..- _.._- i ILi'.4~L F'OINT Al' ----3821,02 ~.'~40.00 26,46 3858,':"'-" ',---~.,_ m , TION, RI4E, U.M. GEO: ~~ 1050'. 16 1167'------~ I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA Al'ID THAT THIS PLAT REPRESENTS AN AS- BUILT SURVEY MADE BY ME, AND THAT ALL D I,'4EI'ISI0NS AND OTHER DETAILS ARE CORRECT, AS OF: DATE D.S. 14 - CONDUCTORS 9 THRU AS RUII_T LOCATISI'IS STATE PLANE LAT & LC)NC, 9. v = 5,938,475.76 x = 675,5;67.36 LAT = ?0 <' ] 4' ] 5.8q9" LONG : 1~:P.~34'56.2.932' 10. Y 5.~ o : ~3~.:, 593. c.,O x = 675,537,.61 LAT = 7~" 1/4,16. 349" LONG : !~'f;:3~'SY.q2" 4 \\ '\ ,( 1284' \\' ~\ · 14 \\ 1402'.---~ 13 \ ~ 1520'-'-'''''''c \ 12 1637,..--z' 1754,.L~ x\ 0 1872,../'z 9 OEO = 1093' 1068' 1044' 9 1019' 994.' \ \ 970' 3 \ \\ 9.15' \ 920 \\\ ~"~-WELL LINE ANCHOR 13. Y = 5,938,743.~3 :, ....~ [.Al -- 70~1/4'l.q.~lS'' LONG = 148"3/,'5q. .107''; :'"? JUL 0 9 I'98i 14. Y = S, 930,060. ~la ' -. x = C, 7 S. 42 $ . ska Oil & ~as Cons. LA T -- ' 7 0 ° 1 a, 2 O. o 71" Anchorage Commissior~ LONC, = 148"34'Sc'.'-]2]" 12. Y X L;,T L qtlr'.. -- i II ii iii i ii , il il___ - i-- ---- .... -- i iii i i AllanticRichfieldCompany ~;~ -jDATE- [DRAWING No: NORTH AMERICAN PRODUCING DIVISION16'AUG'i98 ' ' ALASKA DISTRICT -- PRUDHOE BAY I, 0 -'-':'-: ': ..... '"','.*: ..... '--' IIII ' -- ]' - -- ~ ~~_ ~'-?TmZ~lllL I ii jll ii i i i ii iiii L~ SURFACE DIVERTER S',' ST E D,I Note: Valves on Jiverter lines open automatically when the annular preventer is closed. JUL 0 91~'] 1. 20" BRADEHHf:AD ~. 20" 2000 PSI DRILLI:'IG SPOOL 3, 20" 2000 PSI AI'IHULAR PREVEHTER 4. 10" BUTTERFLY VALVES 5. RIG DRILLING RISER 6. 10" LIHES TO SUMP 13-5/3" SOP ST~C~ ~ ...... Accu,.-.ulat~r £a~acit': Test PREVENTER BL I ND R,.qHS PIPE RR~S . DRILLING SPOOL PIPE RR~S . .,JUL 0 9 12. Alaska 0]1 & Gas ConS. CommissJor~ z~.nchorago Check and fill accumulator reservoir to proper level ~.¢ith hydraulic fluid. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. Observe time, then close all units simultan- eously and record the time and pressure re- maining after all units are closed with charging pump off. Record on IADC report. (The acceptable lo~er limit is 45 seconds closing time and 1200 psi remaining pressure.) 13-5/8" BOP Stack Test 1. Fill BOP stack and manifold with a non- freezing liquid. 2.., Check that all hold down screws are fully re- tracted. Predetermine depth plug will seat & mark running joint. Run test plug on drill pipe and seat in wellhead. Run in lock down screws in head. 3. Close annular preventer and chokes and ~ypass valves on mani fold. 4. ~ In each' of the following tests, first hold ~- 250 psi low pressure test for a minimum of 3 minutes, then test at the high pres'sure. ...5. Increase'"f~-essure to 3000 Psi arid hold for a min.ir~Jm-..of ~:..minutes. Bleed pressure to zero. 6. Open annula.~ preventer and close top set of pi) · "rams. Increase pressure to 5000 psi & hold fo: at least 3 minutes. Bleed pressure to zero. 7. Cl'ose valves directly upstream of chokes & opel chokes. Increase press, to 5000 psi & hold fo: at least 3 min. Bleed pressure to zero. 8. Open top set of pipe rams then close bottom se of. pipe rams. Increase press, to 5000 psi bel. the bottom set of pipe rams & hold for at leas 3 mi nutes. 9. Test remaining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. - .i.,.. '.'.' lO. Bleed pressure to zero. Open bottom set Of pipe rams. ll~ Back iff running joint and pull ou~ o'f hole. Close blind rams and test to 5000 psi for at least 3 minutes. Bleed pressure off all equipment] Open blind rams. Make sure manifold & lines are full of non-freezing liquid and all valves are set in drilling position. 13. Test standpipe valves to 5000 psi. 14. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. · 15. Check operation of De Gasser. 16. Record test information on Blowout preventer test form. Sign and send to Drilling Super. '.. 17. ~erform cgmPlete BOPE test onc~ 'W~ek J'AJ .,. CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE YES NO REb~RKS (2) Loc - ,,, (2 thru 8) Is the permit fee attached .......................................... ~Z~__ · 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. ~/~ .. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ................................. 8. Can permit be approved before ten-day wait .......................... (3) Admin ~-~/< ~-/O ~/ 9. (9 thru 11) 10. 11. Does operator have a bond in force .................................. ~ Is a conservation order needed ...................................... Is administrative approval needed ................................... (4) Casg 2~thru ?0~/~ ~ / (5) BOPE 2i~thr-u 7-/24) ~p-~/ (6) Add: 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Is conductor string provided'. ..... ' ......... Is enough cement used to circulate g~'gog~ug~g~'~gd gg~gg ..1[ .... Will cement tie in surface and intermediate or production strings Will cement cover all knOwn productive horizons .................... Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burs this well to be kicked off from an existing wellbore Is Is old wellbore abandonment procedure included on 10-403 ............ well bore separation proposed ........................... Is adequate Is a diverter system required ...................................... Are n~cessary diagrams of diverter and BOP equipment attached ...... Does BOPE have sufficient pressure rating'- Test to ~-~ psig Does the choke manifold comply w/AP1 RP-53 (Feb,78) .................. Additional requirements ............................................. Additional Remarks: Geology: Engineering: · HWK ~ \ LCS~ BEW JAL rev: 03/10/81 iNiTIAL I GEO. UNIT 'ON/OFF POOL CLASS STATUS AREA NO.. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIXi .. No special'effort has been made to chronologically organize this category of information. .o LIBk~RY TAPE CURVE SPECIFICATIONS Company ARCO ALASKA, INC. Well D.S. 14-13 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date 11-8-81 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale R!L.D' ~ Induction Log - Deep DIFL. . . ~'2-2000.. RILM " " - Medium " " RFOC - " " - Focused " " 'GR Gamma Ray " ' 0-100 !00-200 SP Self Potential.· " 0-100, 100-200 · CAL Caliper ' CDL 6-16 DEN Bulk Density ~ ~ CDL 2-3 CN .Compensated Neutron I CN 60-0 · AC Accoustic BHC AC 150-50 · , GR1 Gamma Ray CDL 0-100, 100-200 DENP Density Porosity · CDL ' 60-0 · CORR Correction Curves. CDL -. 25-. 25 , · · , , , , , , , ,,, , ........ , -COM'MEN'TS'I 0:"t'..0 ................................................................. .................... PI.~G'E ............... ...................... .......................... 2550";-00 ............... 255-1--;-90 ................ · 255'-t"-;'-50 LASK 4"~-";'"~"~ 4'9";'"~'"~ '00 .............................. rl'~;' 0'0 .............................. 0 ';'O-O ~mmmmmmmmmmmmmmmmmmmm~ ~----BCHSUMBERGER .... · ~mmmmmmmmmmmmmmmmmmmm~ LIS TAPE VERIFICATION LISTING. LVP 009,H05 VERIFICATION LISTING PAGE ** REEL HEADER ** SERVICE NAME :$ERVIC DATE :81/12/23 ORIGIN : REEL NAME ~REEL ID CONTINUATION # ~01 PREVIOUS REEL : COMMENTS :REEL COMMENTS ** TAPE HEADER ** SERVICE NAME :SERVIC DATE :81/12/23 ORIGIN :1070 TAPE NAME :62326 CONTINUATION # :0! PREVIOUS TAPE : COMMENTS :TAPE COMMENTS ** FILE HEADER ** FILE NAME :SERVIC.O01 SERVICE NAME : VERSION # : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE ~ INFORMATION RECORDS MNEM CONTENTS CN : ARCO ALASKA INC. WN ~ D.S. 14-13 FN : PRUDHOE BAY RANG: 14E TOWN: iON SECT: 9 COUN: NO, SLOPE STAT: ALASKA CTRY: USA MNEM CONTENTS PRES: CNL001F RECORD TYPE 047 ** UNIT TYPE CATE SIZE CODE 000 000 016 O65 000 000 010 065 000 000 012 065 000 000 003 065 000 000 003 065 000 000 001 065 000 000 0t0 065 000 000 006 065 000 000 004 065 UNIT TYPE CATE SIZE CODE 000 000 O07 065 LVP 009,H05 VERIFICATION LISTING RECORD TYPE 047 ** RECORD TYPE 047 ~* COMMENTS JOB 10707,62326 CNL RUN #t, 23'NOV'81 BTM. LOG INTERVAL TOP LOG INTERVAL TYPE FLUID IN HOLE BIT SIZE 10715 2600 DIESEL 8.5 IN. PAGE ~* DATA FORMAT RECORD ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 4 8 4 73 60 9 4 65 .lin 0 1 66 0 ID ORDER # LOG TYPE CLASS MOD NO. LEVEL co~g DEPT FT 0 0 0 0 0 4 0 I 68 RNRA ISN 0 0 0 0 0 ~ 0 I 68 ~H~ ~s. ~U 0 6~ 2 0 0 ~ 0 ~ NRAT ISN 0 42 ! 0 0 4 0 ! 68 G~ ~s. GA~ 0 ~ ~ 0 0 ~ 0 ~ LVP 009.H05 VERIFICATION biS?lNG PAGE 3 NCNb FCNL DATA DEPT 10740.500 RNRA GR 40,844 NCNb DBPT 10700,000 RNRA GR 62,188 NCNb DEPT 10600.000 RNRA GR 19,453 NCNb DEPT 10500,000 RNRA GR 60.375 NCNb DEPT 10400.000 RNRA GR 18.891 NCNb DEPT 10300.000 RNRA GR 13,344 NCNL DEPT 10200.000 RNRA GR 36.406 NCNb DEPT 10100,000 RNRA GR 20,469 NCNb DEPT 10000.000 RNRA GR 72,188 NCNb DEPT 9900,000 RNRA GR 32.094 NCNb DEPT 9800,000 RNRA GR 43.563 NCNb DEPT 9700,000 RNRA GR 39,906 NCNb DEPT 9600,000 RNRA GR 49,844 NCNb DEPT 9500,000 RNRA GR 39,312 NCNb DEPT 9400.000 RNRA GR 49.312 NCNb DEPT 9300.000 RNRA GR 53,000 NCNb 0 34 92 0 0 0 34 93 0 0 2 1069 3 1052 2 1495 3 1016 2 1376 2 1849 2 1455 2 1598 2694 4 825 3 921 4 1008 3 794 4 1158 4 1012 4 1120 .846 .000 .322 .000 .639 .000 .146 ,500 666 :000 .154 ,000 .467 .000 .609 .000 .300 .000 .523 ,500 .654 ,000 .996 ,000 9O2 '000 . 914 :000 ~477 000 219 :000 NPHI FCNL NPHI FCNL NPHI FCNb NPHI FCNL NPHI FCNb NPH! FCNb NPHI FCNb NPHI FCNL NPHI FCNL NPHI FCNb NPHI FCNb NPHI FCNb NPH! FCNb NPHI FCNb NPHI FCNL NPHI FCNb 27 312 33,984 316,500 24,768 566,500 28,224 323,000 23,856 516.000 19,248 858.000 19,776 589.500 21,264 612,000 5,472 2072,000 56,209 182.375 46.417 252.000 201. 59.377 203.375 53.761 235.500 63,265 226,000 49.~41 265, 50 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT 68 68 2.928 3.299 2,785 2.979 2.734 2.457 2.492 2.588 1.360 4,539 3.994 4,684 4,715 4,402 4,930 4.160 bVP 009,H05 VERIFICATION DEPT 9200,000 RNRA GR 79.125 NCNb DEPT 9100.000 RNRA GR 77,625 NCNb D£PT 9000,000 RNRA GR 58,312 NCNb DEPT 8900,000 RNRA GR 47.250 NCNb DEPT 8800,000 RNRA GR 66,500 NCNb DF.P? 8700 000 RNRA GR 66:938 NCNb DF.PT 8600 000 RNRA GR 81~063 NCNb DEPT 8500.000 RNRA GR 58.906 NCNb DEPT 8400,000 RNRA GR 67,813 NCNb DEPT 8300,000 RNRA GR 36,938 NCNb DEPT 8200.000 RNRA GR 34.406 NCNb DEPT 8100,000 RNRA GR 35.406 NCNb DEPT 8000.000 RNRA GR 26,766 NCNb DEPT 7900 000 RNRA GR 32:469 NCNb DEPT 7800,000 RNRA GR 34.312 NCNb DEPT 7700.000 RNRA GR 42.531 NCNb DEPT 7600,000 RNRA GR 51.563 NCNb D£PT 7500,000 RNRA GR 31.875 NCNb EISTING -9, -999, -999. -999. -9 '9. -999. '9. '999, -9 '9. -999. -9 '999: '999. '9. '999. '9, -999. '9, -999, '9. -999. '9. -999, -9 -999: 993 250 993 250 993 250 993 250 993 250 993 250 993 250 993 250 993 250 993 250 993 25O 993 25O 993 250 993 25O 993 25O 993 25O 993 250 993 250 NPHI FCNb NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNb NPHI FCNL NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNL NPHI FCNb NPH! FCNb NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNb -999.250 -999,250 2so :999,250 999,250 -999,250 -999,250 -999,250 -999,250 -999 250 -999:250 -999,250 -999o250 -999,250 -999,250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 :999.250 999.250 :999 250 999:250 -999,250 -999,250 -999,250 -999,250 -999,250 -999,250 -999.250 -999,250 -999,250 -999,250 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT PAGF. -9.993 -9,993 -9,993 -9,993 -9,993 -9,993 -9.993 -9,993 -9,993 -9.993 -9,993 -9,993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 LVP 009.H05 VERIFICATION LISTING PAGE 5 DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR DEPT GR 7400.000 RNRA 35,500 NCNb -9,993 -999.250 9 993 9, 50 9 993 -9.993 -999.250 -9.993 -999.250 -9.993 -999.250 -9 993 -999:250 -9 993 -9 993 -999°250 -9 993 -9 993 -9.993 -999.250 -9 993 -9.993 -999'250 -9.993 -999.250 -9.993 -999.250 9.993 -9~9,250 7300,000 RNRA 41.844 NCNb 00,000 RNRA 7241.594 NCNb 7100,000 RNRA 31.375 NCNb 7000,000 RNRA 25.031 NCNb 6900.000 RNRA 32,656 NCNb 6800,000 RNRA 30,469 NCNb 6700,000 RNRA 38.219 NCNb 6600.000 RNRA 22'094 NCNb 6500.000 RNRA 37.906 NCNb 6400.000 RNRA 35'469 NCNb 6300.000 RNRA 15,484 NCNb 6200,000 RNRA 16.047 NCNb 6100,000 RNRA 28.516 NCNb 6000,000 RNRA 20,656 NCNb 5900,000 RNRA 23.156 NCNb 5800,000 RNRA 25,516 NCNb 5700 000 RNRA 14:117 NCNb NPHI FCNL NPHI FCNb NPHI FCNb NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNL NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNL NPHI FCNb NPHI FCNL NPHI FCNL NPHI FCNL -999.250 -999.250 -99~.250 -99 .250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 -999.250 -999,250 -999.250 -999 250 -999:250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999 250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT -9.993 -9.993 -9.993 -9,993 -9,993 -9,993 -9.993 -9,993 -9,993 -9,993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 bYP 009,H05 VERIFXCATfON blS?lNG DEPT 5600,000 RNRA GR 29,797 NCNb 999,993 ' 9,250 DEPT 5500.000 RNRA GR 26,063 NCNb - 250 DEPT 54~.000 RNRA GR .625 NCNb -9.993 -999.250 DEPT 5300,000 RNRA GR 13,641 NCNb -9.993 -999.250 DEPT 5200.000 RNRA GR 36,375 NCNb 9~9.993 = 9,250 DEPT 5100,000 RNRA GR 30,156 NCNb -9.993 -999'250 DEPT 5000 000 RNRA GR 31:219 NCNb '9,993 '999,250 DEPT 4go0.o00 RNRA GR 33.000 NCNb 9;~'993 -.250 DEPT 4800.000 RNRA GR 32.469 NCNb -9.993 -999,250 DEPT 4700.000 RNRA GR 14,688 NCNb 9~9.993 - 9.250 DEPT 4600,000 RNRA GR 30,531 NCNb -9.993 =999.250 DE:PT 4500 000 RNRA GR 28~234 NCNb =9 993 -999:250 DEPT 4400.000 RNRA GR 21.406 NCNb =9 993 -999:250 DE:PT 43~:000 RNRA GR 125 NCNL =9.993 =999,250 DEPT 4200.000 RNRA GR 31.688 NCNb =9.993 =999'250 DEPT 4100,000 RNRA GR 20,219 NCNL -9 993 DEPT 4000.000 RNRA GR 28,875 NCNb =9,~93 -999. 50 DEPT 3900,000 RNRA GR 21.094 NCNb -9 993 -999:250 NPH! FCNL NPHI FCNL NPHI FCNL NPHI FCNG NPHI FCNb NPHI FCNG NPHI FCNL NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNL NPHI FCNL NPHI FCNG NPHI FCNb NPHI FCNb NPHI FCNb NPHI FCNb ~99 290 99~:250 -999.250 -999,250 -999,250 -999.250 :999 250 999:250 -999.250 -999.250 ,250 '999,250 '999,250 '999,250 '999'250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,250 '999,~50 '999, 50 -999,250 -999,250 -999,250 -999,250 -999,250 -999,250 -999.250 -999,250 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT PAGE: -9.993 -9.993 -9,993 =9,993 -9.993 -9.993 =9.993 -9,993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 LVP 009,H05 VERIFICATION LISTING PAGE 7 DEPT 3800,000 RNRA GR 36,000 NCNb -9.993 NPHI -999.250 FCNL -9,993 NPHI -999.250 FCNL -9,993 NPHI -999,250 FCNb -9 993 NPHI -999:250 FCNb -9 993 NPHI -999:250 FCNL -9 993 NPH! -999:250 FCNL , 0 FCNL 9~9,993 NPHI - 9,250 FCNL 9~9 993 NPHI - 9:250 FCNb 9,993 NPHI -9~9.250 FCNL 9;9 993 NPHI - 9:250 FCNL -9.993 NPHI -999,250 FCNb 9 993 NPHI DEPT 3700.000 RNRA GR 30,000 NCNb DEPT 3600.000 RNRA GR 21,781 NCNb DEPT 3500.000 RNRA GR 24.297 NCNb DEPT 3400.000 RNRA GR 36.781 NCNb DEPT 3300,000 RNRA GR 29,000 NCNb DEPT 3200.000 RNRA OR 30.734 NCNb DEPT 3100.000 RNRA OR 27.547 NCNb DEPT 3000,000 RNRA GR 40.719 NCNb DEPT 2900.000 RNRA GR 20.500 NCNb DEPT 2800,000 RNRA GR 11,172 NCNb DEPT 2700,000 RNRA GR 16.250 NCNb DEPT 2600.000 RNRA GR -999.250 NCNb ** FILE TRAIbER **' FILE NAME {SERVIC,O01 SERVICE NAME l VERSION # l DATE l MAXIMUM bENGTH { 1024 FILE TYPE l NEXT FILE NAME ~ ** TAPE TRAILER ** SERVICE NAME lSERVIC -999.250 -999'250 250 999~250 -999,250 -999,250 -999,250 -999.250 -999,250 -999,250 -999,250 -999o250 -999,250 -999.250 -999 250 -999~250 :999,250 999,250 '999.250 '999,250 '999.250 '999,250 '999.250 '999,250 999,250 :999.2S0 NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT NRAT -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9.993 -9,993 -9.993 -9.993 -9.993 -9,993 -9.993 LVP 009,H05 VERIFICATION LISTING PAGE DATE :81/1~/23 ORIGIN :10 0 TAPE NAME :62326 CONTINUATION # :01 NEXT TAPE NAME : COMMENTS :TAPE COMMENTS ** REEL TRAZLER SERVICE NAME ~SERVIC DATE :81/12/23 ORIGIN : REEL NAME :REEL ID CONTINUATION # :01 NEXT REEL NAME : COMMENTS :REEL COMMENTS