Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout184-030MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, January 10, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC X-26 PRUDHOE BAY UNIT X-26 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/10/2025 X-26 50-029-21085-00-00 184-030-0 W SPT 8459 1840300 2115 1470 1470 1469 1470 4 15 14 12 4YRTST P Bob Noble 11/10/2024 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT X-26 Inspection Date: Tubing OA Packer Depth 10 2507 2496 2488IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN241111144219 BBL Pumped:5 BBL Returned:4.5 Friday, January 10, 2025 Page 1 of 1 9 9 9 9 9 9 9 999 9 9 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.01.10 15:58:50 -09'00' MEMORANDUM TO: Jim Re P.I. Supervisor FROM: Brian Bixby Petroleum Inspector I Well Name PRUDHOE BAY UNIT X-26 Insp Num: mitBDB201102162109 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, December 8, 2020 SUBJECT: Mechanical Integrity Tests Hitcorp North Slope, LLC X-26 PRUDHOE BAY UNIT X-26 Sre: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-21085-00-00 Inspector Name: Brian Bixby Permit Number: 184-030-0 Inspection Date: 11/2/2020 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min X-26 Type In PTD I Type :Test psi � 8459 � 1569 1572 1572 1571 ' Well YP J w T�Tubing, 1840300 � 1 -- I T e Testi SPT 2115 L A 778 2398 2387 2381 -� - - - - -- BBL Pumped: ! 22 BBL Returned: 2.4 OA 11 323 504 499 498 ' --- Interval 4YRTST IP/F P- Notes: Tuesday, December 8, 2020 Page I of 1 MEMORANDUM TO: Jim Regg -i�„q q l Pj � 7Tjr P.I. Supervisor `� ll FROM: Brian Bixby Petroleum Inspector Well Name PRUDHOE BAY UNIT X-26 Insp Num: mitBDB201102162109 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, November 3, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC X-26 PRUDHOE BAY UNIT X-26 Src: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-029-21085-00-00 Inspector Name: Brian Bixby Permit Number: 184-030-0 Inspection Date: 11/2/2020 Packer Depth Well X-26 Type Inj w ',TVD 8459 PTD 1840300 Type TestSPT Test psi 2115 BBL Pumped: 2.2 Returned: 2.4 Interval -BBL -- 4YRTST P/F P Notes: Pretest Initial 15 Min 30 Min 45 Min 60 Min Tubing 1569 1572 ' 1572 - 1571 - IA 778 2398 _ 2387 2381 OA Tuesday, November 3, 2020 Page 1 of 1 Operator Name:2. Development Exploratory Service… …… 5 Permit to Drill Number:184-030 6.50-029-21085-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 9770 9724 9211 8934 8460 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 38 - 118 38 - 118 Surface 2638 13-3/8" 38 - 2676 38 - 2676 5380 2670 Intermediate 9204 9-5/8" 36 - 9240 36 - 8749 6870 4760 Production Perforation Depth: Measured depth: 9280 - 9719 feet True vertical depth:8787 - 9206 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 34 - 9039 34 - 8559 8934 8460Packers and SSSV (type, measured and true vertical depth) 4-1/2" BOT Perm Packer Liner 788 7" 8982 - 9770 8505 - 9254 7240 5410 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 14980 450 1261 14214 1259 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907)777-8547 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG 5 GINJ …SUSP ……SPLUG 16. Well Status after work:Oil …Gas … Exploratory …Development …Stratigraphic … 15. Well Class after work: 5Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9254 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028313 PBU X-26 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 500 By Samantha Carlisle at 2:48 pm, Sep 24, 2020 Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.09.24 14:17:12 - 08'00' Stan Golis DSR-9/24/2020 SFD 9/25/2020 MGR29SEP2020 RBDMS HEW 9/28/2020 ACTIVITY DATE SUMMARY 9/22/2020 ***WELL INJECTING ON ARRIVAL*** (HES E-Line Drift & Perforate) DRIFTED W/ 3-3/8" x 30' DUMMY GUNS (3.66" O.D.) TO 9721' ELMD (no issues). PERFORATE 9658' - 9688' W/ 3.125", 6 SPF, 60 DEG PHASE MILLENIUM GUNS. LOG CORRELATED TO GEARHART CBL DATED 17-MAR-1984. ***JOB COMPLETE ON 22-SEP-2020*** Daily Report of Well Operations PBU X-26 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS jAN h 1. glon 1. Operations Performed 1 - Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations utggddyy��r%�(,.p Suspend ❑ Perforate 21 Other Stimulate ❑ Alter Casing ❑ Change Apjir Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Mill Cement & Sand Plug RI 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ❑ Exploratory ❑ 5. Permit to Drill Number. 184-030 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ® 6API Number: 5M29-21085-00-00 7 Property Designation (Lease Number): ADL 028313 8. Well Name and Number: PBU X-26 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 9770 feet Plugs measured None feet true vertical 9254 feet Junk measured None feet Effective Depth: measured 9724 feet Packer measured 8934 feet true vertical 9211 feet Packer true vertical 8460 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 38-118 38-118 Surface 2638 13-3/8" 38-2676 38-2676 5380 2670 Intermediate 9204 9-5/8" 36-9240 36-8749 6870 4760 Production Liner 768 7" 8982-9770 8505-9254 7240/8160 5410/7020 Perforation Depth: Measured depth: 9280-9719 feet True vertical depth: 8787-9206 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 34-9039 34-8559 Packers and SSSV (type, measured and 4-1/2" BOT Perm Packer 8934 8460 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Md Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 2959 20 940 Subsequent to operation: 12815 500 1280 14.Attachments: (required per20 roc 25.070 25 071. 625.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Printed and Electronic FractureStimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG Rl GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Tempel, Joshua Contact Name: Tempel, Joshua Authonzed Title: Well Integrity Engineer Contact Email: Joshua..Temp�jel(Mbp.corn Authorized Signature: � �� Date: LRo Contact Phone: �y57 3 Form 10-404 Revised 04/2017 �/'7" �". RBDMs, .J SAN 162020 Submit Original Only Daily Report of Well Operations PBU X-26 ACTIVITYDATF CI IAA\IAOV ***WELL INJECTING UPON ARRIVAL*** (perforating) R/U SWCP 4516 SLICKLINE UNIT 12/3/2019 ***CONT WSR ON 12/4/19*** ***JOB CONTINUED FROM 03 -DEC -2019*** (Perforating) DRIFTED W/ 3.80" GAUGE RING & EQ PRONG TO MCX @ 2,141' SLM. PULLED 4-1/2" MCX (ser# M-06) FROM 2,161' MD. RAN 12'x 3-3/8" DUMMY GUN, 3.70" CENT, TEL, 2-1/2 SAMPLE BAILER. LOCATE TT @ 9,013' SLM (+18' to ELMD) -- TAGGED BOTTOM @ 9,433' SLM_ (9,451' corrected elmd). 12/4/2019 ***WELL S/I ON DEPARTURE*** CTU #9 1.75" coil 0.156WT Objective: under ream cement cap, FCO sand, Drift/log, Adperf Complete weekly bop test. MU/RIH with BOT under reamer 7" 26# blades. Under ream from 9456ft to 9640ft & fluff/stuff using 5300bpd injection water. POOH. 12/19/2019 ***In progress' CTU #9 1.75" coil 0.156WT ***Continue from 12/19/19*** Objective: under ream cement cap, FCO sand, Drift/log, Adperf Clean out down to 9699'w/ 3.70" mill with well on injection. RIH w/ HES Memory log in carrier w/ 3.0" DJN, tag high @ 9655', unable to jet through. POOH. +53' correction on log, shallow of perf interval. Confirm with APE that they want to get to TD. RIH w/ under reamer w/ 6.08" blades. Correct depth at flag, tag @ 9707', under ream from tag down without seeing any motor work at all. Spike of motor work @ 9724' then seemed to level off, PUH chasing returns to perfs. Wait for fill in sump to settle out before attempting dry tag. 12/20/2019 ...Continue to 12/21/19— 2/21/19...CTU CTU#9 1.75" coil 0.156WT ***Continue from 12/20/19*** Objective: under ream cement cap, FCO sand, Drift/log, Adperf Let sump settle out for one hour after under reaming to 9724', tagged @ 9708', same depth as previous attempts. Shut in injection, under reamed down to 9724' again without seeing any motor work. Let sump settle out for one hour. Tag at 9724'. POH. MU & RIH w/ perf gun. Perforate from 9688' to 9719ft usin SLB 3.38" 6spf 3406PJ. Check injection rate - 5.8bpm/1142psi. Shots fired. RDMO. ***Complete*** 12/21/2019 TREE= 4'CNV WELLHEAD= MCEVO ACTUATOR= CNV NIDAL KB. ELEV= 75.00 - Imp nml- DJS/JMD PULLEDPXNPLUG(01/16/16) SAFETY NOTES: H2S READINGS AVERAGE 125 ppm XA ml ON M I — WELL REQUIRES A SSSV WHEN ON DATE REV BY COMMENTS DATE REV BY COMMENTS 03MB194 AUDI INITIAL COMPLETION 02/12/16 DJS/JMD PULLEDPXNPLUG(01/16/16) 10/15/13 RM/PJC ADPERFS 01/1320 JTWJMD UNDERREAM & ADPERFS 1221/19 01/07/14 CRW/JM CMT TOP CORRECTION 01/1320 DDJMD CORRECTED BF DEPTH 06/16/14 JTG/JMD CORRECTED NP 01/05/16 MGS/JMD SET PXN PLUG 01/03/16 02/12116 RB/JMD TREE C/O (01/11/16) PRUDHOE BAY UNIT WELL: X-26 PERMIT NO: 1840300 API No: 50-029-21085-00 BP Exploratim (Alaska) 0 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday,November 29,2016 TO: Jim Regg 7 ,Ir1111� P.I.Supervisor Ike�I SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. X-26 FROM: Lou Grimaldi PRUDHOE BAY UNIT X-26 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry J`' NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT X-26 API Well Number 50-029-21085-00-00 Inspector Name: Lou Grimaldi Permit Number: 184-030-0 Inspection Date: 11/22/2016 Insp Num: mitLG161122124734 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well X-26 Type in ' W TVD 8459 - Tubing 1050 I 1050 - 1049 - 1049 - PTD 1840300 - Type Test SPT Test psi 2115 IA 110 2394 - 2389 - 2382 Interval 4YRTST P/F P OA 47 186 183 . 181 • Notes: 3.8 bbl's diesel pumped,2.9 returned.Good four year MIT.All pertinent,required paperwork supplied on location by BP rep,Josh Murphy. SCANNED APR 0 6 2017 Tuesday,November 29,2016 Page 1 of 1 \-1'4 -0 3 0 • Z6g21 WELL LOG TRANSMITTAL RECEIVED PROACTIVE DINOSTIC SERVICES, INC. MAR LULU AG DATA LOGGED OGC40K.BENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2— 1 900 Benson Blvd. Anchorage, AK 99508 oancodc(a�bn.com and SWa APR 0 8 2016: ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 20-Jan-16 X-26 BL/CD 50-029-21085-00 2) Signed : v 6,..e.o.exeetDate : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE(p MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Saturday, January 23, 2016 2:24 PM To: Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator; Regg,James B (DOA) Subject: Injector X-26 (PTD 1840300) Packer Anamoly logged Attachments: X-26 (PTD #1840300) Wellbore Schematic.pdf Chris, Per the voicemail left yesterday, Injector X-26 (PTD 1840300) is an Operable WAG injector that failed a MIT-T January 02, 2016 after a downhole plug was set below the packer at 9007' MD for upcoming tree change out. There was no indication of inner annulus (IA) pressure communication during the failing MIT-T so the plug was pulled and reset on January 03, 2016. However, due to a leaking surface safety valve (SSV), the downhole plug was unable to be re-tested . A passing MIT-IA was obtained on January 05, 2016 to verify the well had two competent barriers and to confirm that it was the downhole plug not holding. Following a tree replacement, a MIT-T to 2500 psi was performed on January 13, 2016 to verify that the downhole plug set on January 03, 2016 was holding. Again the MIT-T failed with no indication of IA pressure communication. Between the January 16th and January 19th, Slickline performed diagnostics to troubleshoot the plug but a passing MIT-T was not obtained nor was there any indication of tubing to IA communication during these failed pressure tests. On January 20, 2016 a leak detect log identified a packer anomaly between 8936'to 8938' MD (packer depth is 8934' MD). The anomaly does not appear to be a through packer leak given the passing MIT-IA. On January 20, 2016 the plug was pulled and reset higher at a depth of 8850' MD and a passing MIT-T to 2500 psi was obtained. BP will continue to operate this WAG injector with no plans for remediation as the passing MIT-IA obtained on January 05, 2016 and the passing MIT-T obtained on January 20, 2016 indicate two competent barriers to formation. At this time, no further actions will be pursued unless the state advises a different course of action. A copy of the wellbore schematic has been attached for reference. MIT data can be provided upon request. Please call with any questions or concerns. Thank you, Whitney Pettus sC U EQ MIV 2 6 2016, (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator G WIC Office: 907.659.5102 WIC Email: AKDCWeIllntegrityCoordinator@BP.com 1 TREE= d"CNV SA.NOTES: 112S READINGS AVERAGE 125 ppm WI3.LhEAD= MCEVOY —� WHN MI"""WELL REQUIRES A SSSV WHEN ON ACTUATOR= AXELSON A" INITIAL KB.ELM 75.00' BE 13EV= 39.90' KOP= 3100' Max Angle= 26"@ 3800' , 1 2161' I--14-1/2"OTIS X NP,ID=3.813" 1 Datum ND= 9372' Datum TVD= 8800'SS 13-3/8"CSG,72#,L-80,0=12.347" H 2676' A Minimum ID = 3.725" 9007' 4-112" OTIS XN NIPPLE I I • 8860' —14-1/2"OTTS xA SLD SLV,0=3.813" --I 8910' __1113G SEAL ASSY W/G SEAL ( 8934' J-9 5/8"x 4-1/2"BOT PKR 0=3.813" 8976' —(4-112"OTIS X NP,0=3.813" TOP OF 7"LNR —( 8982' 9007' -j4-1/2"0115 XN NP,0=3.725" 9007' —4-1/2"PXN PLUG(01/03/16) 4-112"TBG,12.6#,L-80,.0152 bpf,0=3.958" H 9039' - 9039' H4-1/2"WLEG,0=3.9589" 9031' H ELMD TT LOGGED 08/31/85 9-5/8'CSG,47#,L-80,0=8.681" —1 9239' • ' 9360' 1 MARKER JOUNIT FERFORATION SUMMARY ' REF LOG:BRCS ON 03/13/84 ANGLE AT TOP PERF:18"@ 9280' ' Note:Refer to Production DB for historical perf data SIZE SW INTERVAL Opn/Sq7 SHOT SQZ 3-3/8" 6 9280-9302' 0 03/13/84 3-3/8" 6 9393-9413 0 10/15/13 3-1/8" 4 9393-9413' 0 03/13/84 11111111 9427' ELM -TOP OF CEMENT(TAGGED 10111/13) 3-1/8" 4 9423-9440' 0 03/13/84 11111111111, 3-1/8" 4 9450-9483' S 10/26/00 111111. 2-7/8" 4 9493-9542' C 10/26/00 9467' SAND TOP(10/06113) MID -- 9727' 11111111 1 11/1111111111114 7"LNR,26#,L-80,.0383 bpf,ID=6.276" -J 9768' 11 WA.. DATE REV BY COM,NTS DATE REV BY COMMENTS PRUDI-DE BAY UNIT 03/18/84 AID INTIAL COMPLETION 10/15/13 RM PJC ADF H FS WELL: X-26 07/13/02 JC/KAK CORRECTIONS 01/07/14 CRW/JM)C ff TOP CORRECTION PERMIT ND:'1840300 02/16/11 M3/JM3 ADDED SSSV SAFETY NOTE 06/16/14 JTG/JM) COI2fT®X NP AR No: 50-029-21085-00 01/20/12 T asYJND ADDED l-QS SAT-EIY NOTE 01/05/16 MGS/JM3 SET PXN PLUG(01/03/16) Sec.6,T1ON,R14E 200'FSL&618'FEL 10/11/13 TTR/JM3 SAND PLUG/CMT(10/6-7113) 11/07/13 PJC CMF TOP CORRECTION BP Exploration(Alaska) • IVGI� STATE OF ALASKA , 3KA OIL AND GAS CONSERVATION COMMISSION NOV 0 7 2013 REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon ❑ Repair Well❑ Plug Perforations Ll Perforate U OtherH Move Cmt Cap Deeper Performed: Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Development❑ Exploratory ❑ 184-030-0 ' 3.Address: P.O.Box 196612 Stratigraphic0 Service 0 6.API Number: Anchorage,AK 99519-6612 50-029-21085-00-00 • 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0028313 PBU X-26 • 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 9751 feet Plugs measured 9427 feet true vertical 9238.29 feet Junk measured None feet Effective Depth measured 9427 feet Packer measured 8934 feet true vertical 8927.38 feet true vertical 8459.43 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 35-115 35-115 Surface 2641 13-3/8"72#L-80 35-2676 35-2675.89 4930 2670 Intermediate None None None None None None Production 9205 9-5/8"47#L-80 35-9240 35-8749.44 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9280-9302 feet 9393-9413 feet 9423-9440 feet 9450-9467 feet 9467-9483 feet 9493-9542 feet True Vertical depth 8787.43-8808.35 feet 8894.98-8914.04 feet 8923.57-8939.77 feet 8949.3-8965.51 feet 8965.51 -8980.76 feet 8990.29-9037 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-9039 32-8558.85 Packers and SSSV(type,measured and true vertical depth) 4-1/2"BOT Perm Packer 8934 8459.43 Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): Underream 9390'-9467';Lay Cmt Cap 9427'-9467'.Add Perfs 9393'-9413'. Treatment descriptions including volumes used and final pressure: JAN E c--, i ,ii. 1 Bbl 15.8 ppg Class G Cement,658 psi. NED 2 '- 13. Representative' ai y Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 5647 0 1046 Subsequent to operation: 0 0 4515 0 1035 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Explorator10 Development❑ Service 0• Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil ❑ Gas ❑ WDSPI❑ GSTOR ❑ WINJ ❑ WAG 0• GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron @BP.Com Printed Name Garry Catron Title PDC PE Signature iJetol ,may 0/41 Phone 564-4424 Date 11/7/2013 � z.3,�y RBD Ms NOV 19 1 , i//q /t4 Form 10-404 Revised 10/2012 Submit Original Only C) a 000 00 Cp N CO N- o C Cif) ON Tr N m V .4- CO I"- ) C) • N x- CO O) m CO CO Nr CO N [t N O LO � o ` r-r- co co• xNI"- MCD LO 0) CA CO CON CO 0000 0) Cc))o cxx CO O CC) �- co co 0) CO N- 0 0 LO CO 0) 00) 0) 0N) 00O N O) ▪ 2 Q M toccooa) to N co M co CO co M co co 0 m N 1— N ▪ Q O (1) 0 0 O) _ 0000 C O 00 CD JJ CO CO J d M J J 4t N CO •Ch N X 4t *k N- N Uyit) ZO - CA 46 (V 4 .c Nr COODON- NNr CCD0 C) 0) N co z W E• o 0 W 0 0 e° aCLCLa - LLZ U Q Z Z ce J D D U J J d U) U) F- I ' 1 o (1) E o2 o c CD -Z to �• � 2 = -0o 0 I� E CO CO ti CI O) - N 'c_ O) O N O U) __I •c 73 a' Z v 0 E O N (a LL cu a) E Q us a) co bHW cn = c a -0 aa)) a_0 cO o _ c O -o 0 ,_ D c - a) c)._ m m o E Ws 3 _O ` N O ms 5 4= N w U) O 0 = a) V' JH .0 0 u) 0 cn 0) O Z ca 0 N rn 0 - N- C t = w 0) a) L CO c o -0 O _E < un v1 0- m � o U p - C E 'O CO D a3 ~ 0 LL w W N ca E as is � C a) c 0 IL V) ca o 0 c Q .° w F- CD o_ Q -0 0 _C 0 n m t -J O a�i °o C. ca ai CO o o ca is w ,- P 2 Z ` 0 0 M U a U m o U -0 § X0,5 0 a) Q a c M c 0 c CI co a� O ca c 2 C J O 2 O Zco E 0 E Y 0 - a) C a) E ~ ° 0) 0 H 0 0 u) Q ~ p 0 a) ca = >, 0 aEi U c c 't t c) 0n- 0 O J c p c m U 0 c �� < d p E* pW 0 3 C U * u, >, Cc � LLI - ru) < 0- �' U }c U . m w -o rnm' OU (cn �° *, u) � aov. mw E 0 A L.L. 5O u- in O '> as a.j---...- L\ O < 0) 000 a) II . E m ' Eat a) ca a) CO E c> o' O � 2 � z z 03 co 0 H a) c H a) E > c) - c I- a) n. E a x- O J 0) O U • U L N O U ` O O -0 7, ,� O U L — 7 * Q " � 4) -p a) m U Q c Zr) o -0 a) to * co CO - U) U L() -O O in- a CV _E ca s_ O LO -0 _ N 4) Z O_ CO _ O O + I II � � � � � � � -0 0 � 3 ^ � c a) 0Lo O xov ,_ LLO > a) co s ? c _ O 7 a) Q— �T Z cc O O > C0 0 3 0- o ` 'a_ 0 0 > C> ca a) 0 _1Ou- - . , _1Q - (0 ° — 0 0 o E -c .0 E 0 0 0 _ °) E 0 -1 --- z z F- o ,- � > *k (n a) 0 *kin o E 5_ c ~ Q.� a* � � w 00 --' Yw II a .6-(z) cn DID > -0) D � 't o a) a) 2 -0 9) D _o E E � � DUUF- UOU O w O - H U - 0 _0u)) O0 c *: U - a Do :. . a „ o _J1- U) * H oU) CO CO CO CO CO CO O O O O O O dI N (N N N N N ar r O O O O O O I ± L z I 0 / @ - E f U..1 < < / \ \ 21 ± 02 0 R / < < O 2 z O 5 H < E O 2 2 2 I ± e < < 2 w # DC a 2 o e W / 0_ ° ® 0) 0w - / " O ± $ o I F- / Z O O 0 6 / iw @ / f \ / ° cc ® O 2 Ta 5 \ I 2 — 2 0 ® O O / O H / @ Cl) A / U a < I / \ a Rm / k \ / \ / 2 \ \ _\ - a IP ROL �� — .// O. \ / \ 5 � / 2 \ O / £ $ IIL - m O 01 yRR $ m2R e2 > = c, % / a / ƒ � k 0b U / 7j) co em0ELO2 AR 5 " � / \ \ / h \ / \ cn ƒ / t 0R \ R _, ± « Q0d / D \ 0 I < o < L < \ / w \ 2 . < < a — > G ± < I < 7 « CD \ E © ƒ / / i ii g \_ . >+ 4 z z < / E < E " 0 6 0 / _\ / CD 0 \ \ cc w L A. \ 2 Z � O .tHO E / / 1 » / O / E \ / - I / ƒ I � > / 2 \ / cc c O D 5 a ? / / \ ±- < $ ƒ < I � i m � \ 2 > - 2 < O ƒ E < -_ / - / >ci i / ƒ ƒ o / a \ % i 6 / / $ co co co / / / LO « 6 / / / TREE= 4'CIW • ACTUATOR= AXE.SON X-2 6 WH O MI. WELL REQUIRES A SSSSSV WHEN ON OKB.REV= 75.00' MI. BF.H_EV= 39.90' KOP= 3100' Mtax Angle= 26° 3800 2161' H4-1/2"OTIS DBD SSSV NP,0=3.813" Datum AM= 9377 • Datum ND= 8800'SS 13-3/8'CSG,72#,L-80,0=12.347' H 2676' Minimum ID =3.725" @ 900T 8850' —�4-1/2'OTIS XA SLIDING SLEEVE,D=3.813' I 4-1/2" OTIS XN NPPLE I I { 8910' 1—ITBG SEAL ASSY W/G SEAL I M ( 8934' H9 5/8"x 4-1/2"BOT PKR,D=3.813" I I ( 8976' H4-1/2'OTIS X NP,D=3.813' I TOP OF 7'LNR H 8982' I ' I 9007' I-14-1R'OTIS XN NP,D=3.725" I 4-1/2"TBG,12.6#,L-80,0.0152 bpf,D=3.958' H 9039' I \ I 9039' H4-112'TUBING TAIL I 9031' H ELMD TT LOGO 08/31/85 I I 9-5/8"CSG,47#,L-80,D=8.681" H 9239' I A 1. I I 9360' —I MARKER JOINT I PERFORATION SUMMARY REF LOG:BHCS ON 03/13/84 ANGLE AT TOP PBRF:18°Q 9280' Note:Refer to Production 06 for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8' 6 9280-9302' 0 03/13/84 3-1/8' 4 9393-9413' 0 03/13/84 3-1/8" 4 9423-9440' 0 03/13/84 �.�.�1.��1�. I —9441' I—ITOC(10/07/13) 3-1/8' 4 9450-9483' S 10/26/00 #4.44.#4.44:44.#6.1 2-7/8' 4 9493-9542' C 10/26/00 A�•�•�•�•�•�•�W, 9467' —I SAND TOP(10/06/13)I PBTD 9727' *WRAY 7" R,26#,L-80,0.0383 bpf,D=6.276' 8768' 1.� 1.� LN DATE REV BY COMMENTS DATE REV BY COMMENTS N(TS PRUDHOE BAY WIT 03/18/84 ORIGNAL COMPLETION 02/16/11 MS/JMD ADDED SSSV SAFETY NOTE WE-L: X-26 02/22/01 SIS-OAA CONVBZTS)TO CAMAS 01/20/12 TMltYJMD ADD®112S SAFETY NOTE PERMIT No:'1840300 02/26/01 SIS LG FINAL 10/11/13 TTR/JMD SAND PLUG/CMT TOP(10/6-7/13 API No: 50-029-21085-00 06/26/01 I'YTP CORFECTIONS Sec.6,T1ON,R14E 200'FSL&618'FEL 07/13/02 JC/KAK OOFTIONS BP Exploration(Alaska) • w w�\ %%%s THE STATE Alaska Oil and Gas �� �f�Ll 1V� Conservation Commission GOVERNOR SEAN PARNELL 333 West Seventh Avenue OF Q. Anchorage, Alaska 99501-3572 ALASY' Main: 907.279.1433 Fax: 907.276.7542 SCANNED , r Laurie Derrick Petroleum Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X-26 Sundry Number: 313-431 Dear Ms. Derrick: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster Chair DATED this Iday of August, 2013. Encl. • 411t,‘,(5 RECEIVED STATE OF ALASKA lit AUG 0 7 203 ALASKA OIL AND GAS CONSERVATION COMMISSION 07.5 PI 1 S/LI APPLICATION FOR SUNDRY APPROVALS AOGCC 20 AAC 25.280 1.Type of Request: Abandon❑ Plug for Redrill❑ Perforate New Pool❑ Rep&Well❑ Change Approved Program❑ Suspend❑ Plug Perforations❑ Perforate 0 • Pull Tubing❑ Time Extension❑ Operations Shutdown❑ Re-enter Susp.Well Stimulate❑ Alter Casing❑ Other. Mill&Re-Cement El• 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. BP Exploration(Alaska),Inc. Development ❑ Exploratory ❑ 184-030-0 • 3.Address: Stratigraphic ❑ Service 0 • 6.API Number. P.O.Box 196612,Anchorage,AK 99519-6612 50-029-21085-00-00 . 7.If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? 341 D PBU X-26 • Will planned perforations require a spacing exception? Yes ❑ No ❑ _ 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0028313 • PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 9751 . 9236 . 9388 8890 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 75 20"x 30" 35-110 35-110 Surface 2642 13-3/8"72#L-80 34-2676 34-2675.89 4930 2670 Intermediate None None None None None None Production 9207 9-5/8"47#L-80 33-9240 33-8749.44 6870 4760 Liner 788 7"26#L-80 8982-9770 8504.86-92544 7240 5410 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6#L-80 L-80 32-9039 I Packers and SSSV Type: 4-1/2"BOT Perm Packer Packers and SSSV MD(ft)and TVD(R): 8934 8459.43 No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal ❑ 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Development ❑ Service El 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 9/1/13 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG 0 • Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Laurie Derrick Email Laurie.DernckkaBP.com Printed Name Laurie Derrick Title PE Signature � n Phone Date AA—l.-4.4 .44., 564-5952 8/7/2013 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 31 f 3 -4431 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ MY Mt OCT 1 0 201 Other: Spacing Exception Required? Yes ❑ No E Subsequent Form Required: /0 i y 4 / APPROVED Y Approved by: I COMMISSIONER THE COMMISSION (�Date: — —1 Form 10-403 Revised 1/2010 Appro a i v i fo 12 onths from the date of approval. Submit in Duplicate ', • . • X-26 AFE# APBINJEC by To: Len Seymour/T. Norene: GPB Well Service TLs Date: 07/16/2013 From: Michael Hibbert: Wells Engineer AFE: APBINJEC Brittany Black: X-Pad Engineer Subject X-26 FCO IOR: 110 Job Sequence 1 S D&T w/ TEL 2 C FCO to 9471'MD w/ ASRC; Reset Cement Cap (TOC @ 9445') 3 E Reperf —50' Current Status Operable WAG Injector Injection 07/15/2013 6390 bwpd @ 1379psi Max Deviation 26° @ 3800' MD Min ID 3.725" @ 9007' MD (4-1/2" Otis X Nipple) Last CT Tag 05/29/2013 Hard tag @ 9386' Last CT Downhole SBG, Fluff& Stuff cancelled when cement cap found @ Op 05/29/2013 9386 rather than 9442' Last SBHP 07/02/2013 3339 psi Objective • Underream cement cap found at 9386' • Clean out sand down to 9471' (use N2 if needed) • Reset cement cap (TOC @ 9445') • Reperf 9393-9413 interval and 9423-9440' interval '` X-26 Squeezed Perforation Summary On 7/11/2001 a 10-404, permit number 184-030 was submitted for well X-26 summarizing a coiled tubing intervention completed on 10/26/2000 to set a sand plug with a cement cap at 9442' and to cover the perforations 9450-9483' & 9493-9542'md. The subsequent slickline drift tagged PBTD at 9390'md and recovered a sample of mostly schmoo with little cement. The 10- 404 reported the PBTD as Junk since the sample of schmoo was recovered. The cement cap depth was reported at 9442'md based on the calculated depth from volume of cement pumped. Page 1 of 7 • • X-26 AFE# APBINJEC On 5/29/2013 during a coiled tubing intervention to fluff the fill at 9390'md and remove it from the wellbore, it was confirmed that the junk/fill was actually cement. The perforations from 9393-9413' & 9423-9440'md, which were originally reported as open in sundry 184-030, have in fact been closed and below a cement cap. These perforations need to be re-opened so a program has been written to mill the cement & clean out the sand plug. Following the cleanout, a new cement cap will be set with a proposed top at 9445'md and the perforations 9393-9413 / and 9423-9440 will be reperforated to remove any damage. Well History After placing the well on MI in October 2012, the well never warmed up past 60 deg F and the pressure was above 3200 psi. Several SBGs were pumped and the sticky bottom was tagged at 9395' indicating that the only open perfs were Sag perfs. The sag in the area is very poor quality and does not take water or MI well. The objective is to uncover the 2 sets of Zone 4 perfs (9393-9413' and 9423-9440') to increase the injectivity of the well and hopefully get the well to take MI. CT went out to X-26 on 5/29/2013 and found the TOC to be at 9386' rather than 9442'. Please contact Brittany Black at 564-4589(w) or 832-344-8383(c) or Michael Hibbert (o) 564-4351 or 903-5990 (c) with any questions or comments. cc: w/a: Well File Procedure Slickline 1. RU SL 2. D&T w/ TEL. Note corrected depth in AWGRS. Coil Tubing — FCO (underream cement, clean out sand) 1. MIRU CTU and ASRC. PJSM. 2. M/U uderreamer. 3. RIH tag TOC. Correct depth to SL tag. Flag coil. 4. Pull up 50' and begin slowly pumping to check everything is functional. 5. Gradually increase pump rate as per mud motor/milling bit rep recommendations. 6. Periodically pump 10 bbl Geovis to help carry solids to surface. 7. UR to 9471' (top of sand @ 9414'). Treat all fill material the same, ie-do not UR through sand faster than through the rest of the cement/fill. 8. PUH and backream to 9100' 9. RBIH @ 30 to 50 fpm to max depth and pump 20 bbl PowerVis sweep then follow up with slick 2% KCI bottoms up to ensure debris are swept to surface. 10.SD pumping and pull up into the 4.5"tubing to ensure the underreamer will close, if it closes RBIH to liner 11.Drop ball, circulate down w/20 bbl gel pill. W/ circ sub open POOH 80% Page 2 of 7 • • X-26 AFE# APBINJEC Reset Cement Cap 12. POOH, M/U BHA with ball drop shear nozzle (Pig Shear Nozzle) and stinger bar (no checks) 13.RIH. Tie into flag. Dry tag top of sand and determine if sandtop is acceptable (9471' +/-5'). 14.Adjust the depth indicator if needed and position the reel to allow the pigs to be loaded. 15.PUH 10' above sand plug and pump the following in order: a. 5 bbl fresh water spacer b. Foam pig c. 1 bbl cement d. Foam pig loaded with ball e. Sbbl fresh water spacer 16.Displace the cement to the nozzle @ 1-2 bpm and slowly reduce the pump rate to .5 bpm when cement is 2 bbl from the nozzle. a. In cold weather, it is recommended to use methanol/water to displace coil in case the nozzle does not shear 17.Continue to pump until the ball seat. When the ball seats, DO NOT shear. 18.Slowly pull the coil 100' above the calculated cement top and wait 5 min for cement to settle. 19.Shear open the nozzle and POOH while circulating at a minimum rate to keep hole full. 20.FP as necessary. E-Line — Reperf after 3 days of cement curing 1. Ensure well has fluid covering proposed perforation depths — fire perf guns in fluid 2. Tag TOC w/ perf guns before shooting perfs (TOC —9445' MD) a. Call Brittany Black and/or Michael Hibbert if TOC is higher than 9440'MD. 3. Add 17' of perforations from 9423-9440 MD using 3-3/8" PowerJet 3406, HMX guns w/ 6 SPF. See attached annotated log and perforation attachment. 4. Add 20' of perforations from 9393-9413' using 3-3/8" PowerJet 3406, HMX guns w/ 6 SPF. See attached annotated log and perforation attachment. 5. POOH, ensure well is freeze protected if necessary. 6. RDMO. Notify Pad Operator to return the well to injection. Page 3 of 7 X-26 AFE# APBINJEC Tie-In Log: i GE4RHART OEOIOGYorDEPT. • FILING NO. COMPANY SOHIO ALASKA PETROLEUM COMPANY WELL X-26 i24-06-10-14) OEV. END GAZIEU NOW Lei HELD PRUDHOE BAY cc c N COUNTY NORTH SLOPE STATE ALASKA 1 rrtie LOCATION Other Services ci AT SURFACE 200' NSL A 617' WEL { w a SEC. 6 TWP ION RGE 14E Permanent Datum I4SL Elev. 0 Elev.: K.R. 75 Log Measured from KB t 75 Ft.Above Permanent Datum D.F. 73.5 Drilling Measured from BF 39.9 Date 3-17-84 Typo Fluid in Hole Run No. ONE Dens. Viso, Depth—Driller 9727 Max. Rec.Temp, Depth—Logger 9729 Est.Cement Top Btm. Log Interval 97 '3 Equip. ) Location 7542 I 115 Top Log Interval 8480 Recorded By WAITE Owen Hole Size 8,6" Witnessed By ROMRERG CASING REC. Size Wt/Ft Grade Type Joint ' Top Bottom Surface String 133/8 72 L-80 BUTTRESS SURFACE 2676 Prot.String 95/8 47 1-80 BUTTRESS SURFACE 9239 Prod.String . Liner 7 26 L-80 ^ 1 J45 8982 9:720 Page 4 of 7 . . . .. • 0 X-26 AFE# APBINJEC . . ..... aii•P- In Ism mum No or'Ea.. INC ---siml MIll 1M so- al ,m sin En as MD Me illa I ITIM a . ---I!Ma MIN 0101111111111 .."— 11111011111111111 MN!I OM 1101 11 11/11/ANN 111.101111011111111M MIII Mil VIM mi"`_=...-at'MOM 11111111111:1011.1=11 t 8111111M11 MIN MIII I!'MIIMIIIIIII.III MR IIII ...• IIMIMMEM UM M.'1101111111•111111 MIMI KIM SIMI IIIMIINEMNI NM=-•. 11111111111.1111111111111 al11111= NB wilmt- 111111 .m111111i1l m111111a 11 a111111.ft gMio:_.e.l,f..B.I..M•MID 11011111101111 P". 0 M t—o 11 1 i • - . I a MIM MM 6MMa:Wft I 1N1I M Mm;1. . 4M -_MM M M aSC 8M am ME 1mw am=n . o o m n 1 MIIIIM ',MM M . 1m M■M M am I = M SHORT MMEMMIll MIII■11111111■■•=111111111 11111111111MIIIIM MEM MIMI 11=1 IIII op .-- um=asizz..1.1.11111.---- --- lig wmaor..-:.- ims MEE= •I N I NIMINBENtilMIN1111111111111111EII um NE 11111 um ow up--alms morn an ME. MP or;1■••18 IOMMIS MO : IMO IIIM MI NMI MIll Mb rmWm":"— MINN MIMI amotallt ---- --- MI MIE NMI IIIIIW ...■ 1111 MI IMMINIO -AMMINIF inii mireimems - i .......................--.7-........=-.-_-= -— smr-:-.....iimminsp a ase 11111111111111111= _— - 1110.■+mow maw INEMININurtam millill -- - no EN NIP 7.--si iiEl--- is aim ElliiIIIIIIIINulmoir.r.allIIMINI MN MN MIL moll Il■ME/IMMO= miI MIII MIIMIMIMMImemmy!, , V.110■11•111111•••■•••=sr,..■.. —--—.".■ MIMIIIMMIIIIIIIIIIIIIIII , — tn......m b...,■,....... --— --..__ 1=IMIMIIII If A-- =MI 11111M11111MIMP 17.7rm mom--- IMI MIR 1111111011111.NM m.---111111111111111 am alec...-..ims NMI MO NO Imo IN EiN ,mem mi.2.9.-- -- - - ammismo ow!!. .4 mamma iii mil , moims.:ma wit mine . - -- -.... 0111111 IMiN IMEN•1111111■1=II MEI 0 g ,'V-- -- Iiiall•Or......--E.— OD iMiMiii 111111 MOM MN MIMI EMI MI=I .......1................, I Win Is in ti. Emir wt.:. WM/111111MIIIIMM MIN= 4,- Ay. ‘'l 1111111111WA as mum ma* um =1* MI Ma'MO Mill---mom =Li.IIIMMIIIIIIIIIIII MI MIM MI INN MO I MI MI MI MI MIIIIIMIN MUM MINA.Ma MI!a 1111111111111111111 ma 14) ',1 . ' - EIN■ir al =me MIN MN MIMI ft 6,10 _41111111111ME AM MIll If&NM 1.11.1.11111111111 1 1. ■ 't miumral malummo ale v% Ems.limmoup sr. rommale --fl- ow 1111.111111111111 MN El VW..a•I MINED E•ojEBIMIIIIII ENNEENIII P- Inie EIENNIEE am Wm MEI NMI EMI NM mmill1111 t - MN AIM■Moo....""IIIIII IMO ME— =16.7•1 IMMMIIIIIIII MI MIMI r--- 1•111111111111111 Maim 1111111•PA um NE_r,NENNININNEE 11.11 4 11111••••••041M 11111111111i=.E'm MEM 1011111•1111111111111111111111111 IIN Wu MINIM MIEN 1 M11111111111111111r==.,'INEMMiniel En r... El sa.=trim mmuM11/ i . 111.9 .-iii isiiME1111111 „.1,e,v, ..., ....... ,..,,,.... .,..:441111111111111111111m NimIENNEEmmp-,.. i pow. lirgimi 1110 owsimaisror anis --or Me NNW A -OHO :mum wiNIIIIILmi Sell 4 MEMEMONS MB.. Emegem iralIMMIIIIIIIIM 11011111111•MIIIIIIMMI imMIII 3 Biri=2112n11.11.111 INN NM -----omossonriez..0:--.-......nnuomme 1 «am NEM111111111111111111111 NMI „ivy inn t,,r„,,..i. .___,..,...aaror...... 1 ..... „0,, ,,,,,...14 11•11111110,-., EN wiNmilliNIMINI ;t I Ell ibr • _ Jr um IMMO„t,..Ava,054,A,111111111111a.alla ! 01111111 laIIIIII•111! 116.7a Mal=I!AREN fp,EINIE.2'rill =arm Emlimi NEB III 111111=11 MIMI I Ne.1,6i P 1 UMW mai r MINI IIIINIM r 1.1INE+P...a EN MO SIIININNINIEN .,I ; • • 111 ...--==,...imst!,-0 r,'.---..---41,....-• ....-17......-----•......-- ...., 4 •-=Inc: flre.rii-:MIR=NIT 81121111111MIIIIIIM I dila WTI= -"""Aillirgi MI MOM Me ait........ ■ .. , T OM -AAA 110111111111 MI! ,r 1..""!-A101 al 11111111111111110111111111100 -- —0,51. =MN MEN alli MI MI OM MMIIIIIIII NE=twm• ,,m-z;Taill do 1 Imo Eli IM NM MOM AMEN p4111111•111111111111111PTL fa 11111•Esop .i MEI Illp NMI---'All MIII •IIIIIIMIMIIIMMI6=9. IMMIIIIM um MN WM IIIIII EN■I INN NEIN 4 EIENNIIIIIIIIIIIIIN :1114 NM MIS FM INN 1•111 NM=I MN MIN IMO 4 EIEENENIINNINErN t. ...,■Ii•NM MI IMIII/ha."/WI MIII I■IMMI.ammo ,nommommumm,:v.Zlli.M.I.MPain um itor.pm---us mlimirl•NEHLamorsirrommome mei woo im or ow No dm AM IMO IMP t..:IM Wilma I IMMO NM IIIII 11.11 al % Ma la' 1!!1=111 an!OM mei NIL'Mims .2= a ; NMI 111.11111MAN MI MI=I=I WO MON IMIr*ANNIE MINIM* 111111111111111111MIM OM fir Tla iiii liii 11111111111111111111 NM MINN In NMI= =Mt In = -: NMI 111111111.7.7•11=1 MI&MIN IMIN MR MON 1111111111ram ENI moo*WIMINIIIIIII•111111,NEM Um'111111111 MI rri iten 1 % NS INIVEll Om mows= swim y Eir offum um: MINI Ns ••••am a.lit NINI um INN al•lim am ...1 MIMMIL.IIMM MMIII MIMIIIMIIIMMIMIIIIIII MM.MIMI=IMIIIIIIIIIIMI ORM= "IS°' Enimiter.;---Immo ens immemie t 1: ININI Mr EOM M Minimas NE im ,niatagi_imlatintani= MO Insiiio ma ow iiim sm.NMI. - - =111 MI!MINIM IIIIIIIMI I SIB IN MIIII ,Emma=III.Banmer;.-..._= - NE ENE•EE•Ils•••■•Ns 111=1011•11 ' MP eiNOMMQM- NIIIIIIIIIIIIr"11111111111•Noman maw im am EN asEENIIINEMAIN ENIMP:dimi =111111111.MINE= ENINEUIMIIIMEN NE i '=":1,..0•1111111111 ' ER MeV 11111 IME!!MN .Elm IMININIIIIIIIIIIIIIIIIIMIN t".7.17..111111111111101011. NM Ilit GM Win UM=MN 1 1=1 MIIIIIIMINMINIP MI IIIMIMIIIIIMMIN =NEW An MI Nom MI Win illasMII MN IMMomillIllIrta MI'MMMIIIIIIIIIIIMIMI Ma&4111 MIN=II NM IIIIIIIIIIIIIIIIIIIIIM MEMO 1 EM■1111M"Zigi MI UM 11111111111 1111111 MIN MIMI.------OM= WIWilir;Ai M 11111111111INE meow a INN EN------TwalINI 1■alir:dem 1111111111111111111111111111111.1 NM MO 11111111111111111P IIIIIIII MUM NM IIIIIIMIP __p awn isremom ammo ***WIF411111111111111111111111111111111111111 INN 111111111111111 NMI Ilradi MO On INIVEMOMM illifiNs mime-- -linimmill111111, 11111111101111111111111 • ,). mg mil-.:.-7-----MIMI= ■MEW 1 NM 0 11111111111=1111111111101111111 =I MP!MN NMI IMM IIMI II II I in IMMO MB AMIE IIIIIIIIP 11111111=IIIIIIMI NM MC'1111111 I I III.1 I MINIM MEI MIMI III 11111M...= 1■MIN WAN MO!MI!MO Mn= MIL--- - 1 1M11::-.41 NMI!NEM Mal an! .i- 41 NW MINN im+ammo NE Emu= NE MIN Imo..-."=5•EiminimaiN-- 11''0 T Eb..ireams MY lis IN NNE= ii=w+__-.•- .•.-...INNINNIIIEE.simi At.EIIINIEP f.,,,,) EN amain mom ENE mi.:rm.soll IMMI MIIIIMMI11111116---—11 -1 MIIIIIIII:=.16 MI emIENINEENI it4,. 1 ■mil Elia me r Aor mum ENE NEN/NOM ' 11•11.1.1■1111■Z=04 Imo ImmimmOM I■IIIIM•,"' ''--.1.7.NM 111111111111111111 IMO IIIM■ at IIMI I 1111MIIIIIMIIIIII...-z".•-•,....•mom i■MIMI MUM iiiiiiiiiiiiii MUM■=MI 8.1.1111=11111111•11111M as...-67.-,:..-_,....lie a 't- sorr a•••••111111111111111111111111111 MEM 1•1111111111111111.1IM au am EiNium ■•MO-----1/5/1/IIIIIIIIIII IhoZ''mei UM mom me IIM 1 MN Mil MN V AI SIM MIM MN IIIM EMI 'MEM MEM ma mmii■i■im IMO 11.111111111111111111111 111 INN 111M,.iMIIIIIIIIIIIIIIIIIIIIIII Page 5 of 7 ��N� ---- • ���y - `�' X-26 AFE# APBINJEC 0 PERFORATING PROCEDURE ver.zm°,w".m. nwm X-29 ^�m Date: p"odanr Brittany Balt Office Ph: __- 564c45119 14213 Level: Home Ph: m«"�, Cost Est: om,p"�" mu�w4m3 cc�xrs. ap�musn -----� '---------- � WEILsbbs mw Type Work Dominion 110 eReProds Well Obiectives an*pwrloram" Notes: ^iperfr Reference Log feet Log: BIC LcCemeni Bond Log m the tio-m log m^""" Date: depth with the reference log. Company: *��y� ��c�-- De*hs(frose4e) DRAM(fram4o) Fast SPF nrien* plueino bins »dinark=m ga_383L 94413' 9,383' 92113' 30 _-�6 RmIclom - —__60° 4B.--__Re___ 9 423' 9 440' 9 z423' ' 9 440' I[ _-�6 �-�lrmydom-- ' _____ _____ _____ -_____ ___ ____ ______ ------- ----- ----- ------ --- ---- ---- -------- -------------- _____ _____ _____ ___ ____ nu""este*Gun Size: __3£/81_ Charge: 3406 Power Jet,I-IM).5 /"ora~"m~"w="ss",rn°m=*Unnecessary During Perforating P4/A_______________________ Preferred Amount",o,="do°"/s~v"*."""/"Achieve v"°do~" N/A__________ Last Drift xwu"" Est Res.Pres.@ sy.2 k 3339 pm Perforation Summary Summary Dist Well: x-29 Town: Date. ��m Prod x�^p"oc�, '--'--- --------- -- 1po Canter pom Genera]Comments: �— -------- --- ' -------------------- -------- Depths Babb* Based on Ref Log am Ob. mda& OPP Robing Zone ^dpemRoper( u'u/u __________ _____ ___ ____ ________ m'e/o __________ o'o'o o'o'o - o'o'u ------ -------- ---- ---- -------- -- --- ----------.-------- .--------- .--.--- o/a'u __________ ______ ___ ___ _______ ___________ n/u/o ___ _____ ___ ____ ________ Page 6 of 7 ' . S 0 X-26 AFE# APBINJEC Redlined Wellbore Schematic TREE. 4*CM WEILHEAD' - MLEVOY SAFETY NOTEET:las READINGS AVERAGE 124 ppm ROLIATOR= A • X-26 WHEN ON MI. WELL REQUAIES A SSSV WNEN ON KR ELEV= /5 04 AV . OF.ilEt/• 3984 PROP= 310D Max Angie= 28'0 3804 { 218i. H4-1/7 OTIS MO SSW NP,ID=3 813' I (Wm kV= 9377 411 opium Tvo. 9800 SS i 13-319 050,720,Le0,V.12 34-1-q-1 2676 1--A I Minimum K) =3.725"@ 900T 4-1/2" OM XN NPPLE III SSW* H - -ons XA'LIMO 31.2381/E,ID 03.91r I 1 891r 1_11SGSBAL ASSY VWG SEAL I -1:11 in 89344 4 9 Si&x 4 112.BOTFKR,D.3813 I • 13975. i ..4-112 OTIS x NP,,10•34ir 1 r TOP of ri-m4 H S987 • r tam 1-1-4.1 1r cms xN NV,0=3.7W I 1-4-1.17 TBG,12. ,1.90,00152 BO,p=3 951r IIH_101, I k I-TeliC-Fi-i?2••T6BNG.--i,ii,--q L 2- . ..i. f-a-7-•—rtmo LoGGED moues i ....., i 9-54fr C9G,479,L-80,13•&gar H 923, j A Si I i nett HUMMER JOINT I PEFFORATION SUI161ART REF LOG.8HCS ON 03/13+54 ' rod ANGLE AT TOP FEFF.1r 9290' 01,4'44 Note War to Rodur bon 08 to/historical pad dem hh AI ILL i if LA-As 1"..•/44 trt, oc- Sa/6-A. ww-- — (....sim.--- SCZE Tor- MEM AL opoisqr !Alt eAtAtLki-,-3-war I ---- 9290-9302 0 03113/04 3-Ur 4 9303,9413' 0 03113/84 3-1117 4 9423-944Q 0 03t13/84 alli 3-116r i 4 9450-9493' S 10128/00 2-(18" I 4 9493-9547 C 10/28/00 vs'or:44-ir siser --icarivr TOP I 1.4.4.14•404 1 111...ttiltt ....V li.-- Mint fa".2 . INiMINMONSi PM OUT -- reiraiT1oV 14.4■0101,. #4.••••* r LW,NC L-80,0 0383 W,El P 4.2.7r ei- -NW— 1.4.4.4,4,4,411.1 I DATE REV BY r;111111111jOiril .4,, , ... PRUDHOE BAY UNIT • r L.• PLETION ■-,, 41111 ITIVAID •o' • -- V -7* rr. WELL )428 02122/01 818.08A CONVERTED 10 CANVAS 0V20/12 1101/AID A CI H----- ------25 5ATEWF41311 PE/0M17 Nu-1940300 4,7 7,1".' ti-:=11 FrodL 07/30/12**As3/.94• 8E7 PYN PLUG tairnt12)— APING: 504129-210115-00 010%0 R- iga" ; Mkt *er"' e" 4: TIII "' See.A,111:1N,1414E an ''., ..T*ry ov--. CTIONS . TV Exploration PVialra) - Page 7 of 7 • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations performed: Operation shutdown_ Stimulate X Plugging Perforate_ Sand Plug/Schmoo Treatment Pull tubing_ Alter casing_ Repair well_ Other 2.Name of Operator 5.Type of Well: 6.Datum elevation(DF or K8 feet) BP Exploration (Alaska), Inc. Development_ RKB 75 feet 3.Address Exploratory Unit or Property name P. O.Box 196612 Stratigraphic_ Anchorage, AK 99519-6612 Service_,X Prudhoe Bay Unit 4.Location of well at surface 8.Well number 200' FSL,617' FEL, Sec. 06, T1ON, R14E, UM (asp's 665261,5940316) At top of productive interval 9 Pe /approval number n/a ---WAG Well (asp's n/a) 184-030 At effective depth 10. API number 479' FSL, 1977' FWL, Sec.06,T1ON, R14E, UM (asp's 662814,5940542) 50-029-21085 At total depth 11.Field/Pool 523' FSL, 1877' FWL, Sec.06, T1ON, R14E, UM (asp's 662713,5940584) Prudhoe Bay Field/Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9751 feet Plugs(measured) Cement Top @ 9442'. (10/26/2000) true vertical 9236 feet -ro t✓ —coNfirMtc1 a4 ' 3'c'Mb on 5/29/13 Effective depth: measured 9390 feet Junk(measured) Tagged TD @ 9390'w/2.5"Cent& Sample Bailer true vertical 8892 feet Ls,do( Tun K a At4.s I TO(.- Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" x 30" 72 c.f. 145' 145' Surface 2641' 13-3/8" 3813 c.f. 2676' 2676' Intermediate 9205' 9-5/8" 2159 c.f. 9240' 8749' Liner 769' 7" 320 c.f. 8982' -9751' 8504'-9236' (-1i r4�4-ua-1(y below-ICte- Perforation depth: measured Open Perfs 9280'-9302' 393'-9413', 9423'-9440'\ ceA(e Gar. Below Cement Top 9450'-9483', 9493' -9542' true vertical Open Perfs 8787'-8808', 8895'- 8914', 8924' -8940', Below Cement Top 8949'-8981', 8990'-9037' Tubing(size,grade,and measured depth) 4-1/2", 12.6#, L-80 TBG @ 8910' MD. TBG Seal Assy W/G @ 8910'. Tubing Tail @ 9039'. Packers&SSSV(type&measured depth) 9-5/8"x 4-1/2" BOT PKR @ 8934'. 4-1/2"Otis DBD SSSV NP @ 2161'MD. 13.Stimulation or cement squeeze summary Intervals treated(measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Infection Data Oit-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16.Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations— Oil_ Gas Suspended_ Service_Water&Gas Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Rt/ytp_/ Title: Technical Assistant Date July 11,2001 DeWayne R.Sch orr Prepared by DeWavne R.Schnorr 564-5174 Form 10-404 Rev 06/15/88• SUBMIT IN DUPLICATE . � • • • Perforation Attachment ADL0028313 Well Date Pelf Code MD Top MD Base TVD Top TVD Base X-26 2/19/89 APF 9280 9302 8787 8808 X-26 2/20/85 PER 9393 9413 8895 8914 X-26 10/26/00 SPS 9423 9440 8924 8940 X-26 10/26/00 SPS 9450 9483 8949 8981 X-26 10/26/00 SPS i 9493 9542 8990 9037 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BRIDGE BPS PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK,CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF V OF 7 • • yw \ \ \I / /7 7 THE STATE Al Gil and Gas fA LAsKA Conservation Com fission T�. GOVERNOR SEAN PARNELL 333 West Seventh Avenue ALASY'� Anchorage, Alaska 99501 -3572 Main: 907.279.1433 Fax: 907.276.7542 Brittany Black S(JNNED tiNt 0 3 2013 Petroleum Engineer BP Exploration (Alaska), Inc. 81+4)36 P.O. Box 196612 l Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X -26 Sundry Number: 313 -203 Dear Ms. Black: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner h a! DATED this 2 day of May, 2013. Encl. . • 411 RECEIVED STATE OF ALASKA APR 2 6 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend Plug Perforations Perforate Pull Tubing Time Extension ❑ P ❑ 9 ❑ ❑ n9 ❑ Operations Shutdown ❑ Re -enter Susp. Well ❑ Stimulate El ' Alter Casing ❑ Other: ❑ 2. Operator Name: ,/ 4. Current Well Class: ,r 5. Permit to Drill Number. ✓ BP Exploration (Alaska), Inc. Development ❑ Exploratory ❑ 184-030-0 . 3. Address: Stratigraphic ❑ Service El - 6. API Num V P.O. Box 196612, Anchorage, AK 99519 - 6612 50 -029- 21085 -00 -00 • 7. If perforating: 8. Well Name and Number ✓ What Regulation or Conservation Order governs well spacing in this pool? 341 D PBU X -26 Will planned perforations require a spacing exception? Yes ❑ No ❑ 9. Property Designation (Lease Number): 10. Field /Pool(s): ✓ ADL0028313 • PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): / Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): - 975716` 04 tl 1� ?/ vli, . 1 9 4 42 8942 None None Casing , Length ! Size MD TVD Burst Collapse Structural Conductor 75 20" x 30" 35 - 110 35 -110 Surface 2642 13 -3/8" 72# L -80 34 - 2676 34 - 2675.89 4930 2670 Intermediate None None None None None None Production 9207 9 -5/8" 47# L -80 33 - 9240 33 - 8749.44 6870 4760 Liner 788 7" 26# L -80 8982 - 9770 8504.86 - 9254.4 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): See Attachment See Attachment 4 -1/2" 12.6# L -80 L-80 32 - 9039 Packers and SSSV Type: 4 -1/2" BOT Perm Packer Packers and SSSV MD (ft) and TVD (ft): 8934 8459.43 No SSSV Installed No SSSV Installed 12. Attachments: Description Summary of Proposal ❑ 13. Well Class after proposed work: ✓ Detailed Operations Program la BOP Sketch ❑ Exploratory ❑ Development El Service 0 14. Estimated Date for 15. Well Status after proposed work: / Commencing Operations: 5/15/13 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: WINJ 0 GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Brittany Black Email Dritta nv.Black( BP.com Printed Name Brittany Black Title PE Signature 2 Phone Date 907 - 564 -4589 4/25/2013 COMMISSION USE ONLY 2 Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 31 + ✓ 2 03 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: / Spacing Exception Required? Yes ❑ No ® Subsequent Form Required: /91 — q a G} c i ABDMS MAY - 2 :013 Approved by: COMMISSIONER APPROVED Y THE COMMISSION Date: 0 `� l// 1 �S F kw' OF s\/ `7 /'� n �, , ; �11 " "" 1 i/N ,5/� � v t a Form 10 -403 Revised 1/2010 Approved le ra I fo[ �;C $�onths from the date of approval. Sub it in Duplicate 4 Z,, / ri0 X -26 • • AFE# APBINJEC dap 0 To: C. Olsen/T. Norene: GPB Well Service TLs Date: 04/23/2013 From: Michael Hibbert: Wells Engineer AFE: APBINJEC Brittany Black: X -Pad Engineer Subject X -26 FCO IOR: 110 Job Sequence 1 S D &T w/ sample bailer, TEL for TD tie in. (Collect Sample for analysis) 2 D Shoot IA FL & TIFL 3 C Fluff & Stuff, Jet SBG, Injectivity Test 4 CP Contingent Acid Stim if Injectivity < 5bpm @ 1400psi Needs Sundry Approval Current Status Operable WAG Injector Injection 04/01/2013 6180 bwpd @ 1300psi Max Deviation 26° © 3800' MD Min ID 3.725" @ 9007' MD (4 -1/2" Otis X Nipple) Last Tag 11/08/12 Tagged sticky bottom © 9395' ELMD, 47' o fill Last Downhole Op 11/08/12 Pulled MCX, tagged sticky bottom Last SBHP Estimated ^3100 psi Objective • Flush schmoo from the wellbore into the formation to open up the Ivishak perfs for better conformance and to hopefully get the well to take MI Injection. • The well will only need to be acidized if the injectivity is reduced as a result of stuffing the schmoo into the perfs. The acid should be available on the slope. The job can go on hold if the injectivity test results in a rate lower than 5bpm at 1400psi to get the acid out to the pad. o A sundry will be required for the acid stimulation of this injector. o The Acidizing program requires 48 bbl of 12% HCI. See attached table for acid additives. • The ideal cleanout depth would be 9442'. The total volume of fill to be fluffed and stuffed away is N 1.8 bbls if the ideal depth of 9442' is reached. Page 1 of 4 X -26 • AFE# APBINJEC Well History After placing the well on MI in October 2012, the well never warmed up past 60 deg F and the pressure was above 3200 psi. Several SBGs were pumped and the sticky bottom was tagged at 9395' indicating that the only open perfs were Sag perfs. The sag in the area is very poor quality and does not take water or MI well. The objective is to uncover the 2 sets of Zone 4 perfs (9393 -9413' and 9423 - 9440') to increase the injectivity of the well and hopefully get the well to take MI. Please contact Brittany Black at 564- 4589(w) or 832 - 344- 8383(c) or Michael Hibbert (o) 564 -4351 or 903 -5990 (c) with any questions or comments. cc: w /a: Well File Procedure Slickline 1. RU SL 2. Drift & Tag with TEL & sample bailer. Attempt to collect sample of fill for analysis a. Save all material recovered in the sample bailer for analysis. Mark and label sample with well #, date collected, and collection depth. Drop off sample at Lab for solubility testing to determine if any other fluids will be necessary during this job. b. Please send lab report to Brittany.black and Michael.Hibbert @bp.com DHD 1. Shoot IA FL & Perform TIFL Coil Tubing 1. MIRU CTU. 2. M/U BHA w/ CT Connector, MHA with checks, stingers, and 2 -1/2" JSN. 3. Ensure well is not on injection. Close wing if it is open. 4. Establish injection into wellbore. 5. Freeze protect to 2000' of tubing with 60/40. 6. RIH to 9000'. 7. Establish injection through CT with hot slick 1% KCL. Order 1% KCL at 160F. 8. Ensure backside is closed in and start pumping at max rate into formation with hot slick 1% KCI. 9. Wash down tubing while pumping at max rate to cement cap @ 9442' MD • Take small bites and ensure clean pickup weights. • If unable to wash down successfully, consider opening up backside to circulate bottoms up and POOH to replace JSN with motor /mill. 10.Tag top of cement once fill has been stuffed and begin pumping SBG. 11. Jet 155 bbls of SBG from the TOC across perforations to 9200'. Reciprocate 4 -6 times across perf interval. 12. PUH to 9000' and pump remaining SBG and displace CT with 60/40 meth. Page 2 of 4 X -26 • • AFE# APBINJEC • Avoid over displacing the SBG into the formation, allowing it to soak across the perfs for 3 hours. 13.Open well and line up down the production tubing with 1% KCL. Pump at least 1 WBV (155bb1) then start injectivity test. Continue pumping until a steady injectivity is established. Note results in WSR. a. Goal of injectivity test is to achieve 5 bpm at a maximum of 1400psi WHP. Do not exceed 1600psi WHP. 14.If injectivity of 5bpm @ 1400 psi is achieved, RDMO CTU, contact Pad Operator to resume injection on well. If Injectivity is less than 5 bpm prepare to execute contingent acid stimulation. Coil Tubing Pending — HCI Perf Wash 15. Prepare for Acid stimulation: a. Call for acid: 48 bbl of 12% HCI. b. Ensure Sundry is on site. c. Confirm passing TIFL. 16. RIH to 9350' and start jetting 48bb1 12% HCI across prefs (9393- 9440). Make 1 -2 reciprocating passes across perfs. 17. Displace coil with 1% KCI while pulling up to 9200' and allow the acid to soak. 18.After soak period, pump 75 bbl 1% KCI while RBIH to over displace HCI from the near wellbore and sump. 19. FP coil on way OOH. 20.Turn well over to Ops to POI. Notify Pad Operator that the IA is fluid packed. 21. RDMO Acid additives for the HCL for this job. Temperature law (ambient to 175 F) Completion metallurgy L80 13 r Loading for 12 Product % code Function Units HCI Acid Corrosion GaI /Mgal 4 A264 Inhi A201 InhibitorAid GaliM 0 A153 Intensifier I bIal 0 F103 FlowbackAid GalIMIl j 2 L058 Iron Control I bIMgaI, 20 W054 Anti emulsifier GaIIMgal 5 U067 Mutual Solvent Gal /Mgal 0 Page 3 of 4 .. X -26 AFE# APBINJEC Wellbore Schematic . 4" ON MS RM.011909 AVERAGE 125 ppos A,�AT . A, X -2 6 130 ON hU NOTES: REQWIES A $301e WHEN ON Kk1, REV --t _.._ 75,t)0' 1M7: SF, 8.EV = 39.90 i�cAngle.. 26° @3 1 r 21 i1 * _._ A'1t • ttTii MD S1r tom,In =j t3• Mum NO = 93t2 0 Datum TIM= 8540 SS 13 -3nB' C50„ 140, ID * 12.317' 2870' Msrimtzn D = 3.725" F_ 9oeT l 4-1/2" O i l s XN NPPLE 1 {4 -11r° XA et VP, ID *3813" 89111' 4TBG SEAL. ASSY WG SEAL I - "'r111 89344' H9 5/8" x 4- 912" BOT PKR. D = 3E13` I L 8976" 4 011S X /4 D 3$17 I I TOPOF 7 I� R 10 L 6IG2' , I [ 5007' . 1 - 14 - , .. XNIMIP, Id x a yw 4-102' T00, 12,00, L-00, 0,0152 brit D. 3.958" *03W 1 I 5Q39' 1--14 V2 T1 NG TAT_ .0111* fit 4 )1I t (WAD 00f3145 F cso 479, 1.80, Ib • 8841°' }-i A • 1 F1(3dTlFaI1TIt1NSiMr9ARY 9360` 11 I REF Lea OFr".. ' ANt EAT TOP FEW: Bata: MN b Ftaduoion IEfor hishatal part data ME V* INTEFd7AL OprIK198 DATE ' 3-.3811" 8 9280 -9302 0 0311364 3-118" 4 9343 - 9413' 0 01113184 3.118" 4 9423 - 94412 0 03113134 -118" 4 9454 - 548.7 5 1012804 2-745" 4 9493 - 9542 " C 10/2050 a ,(, ♦ 4 t.+ 1 5442' 1 Tel ® — SAM? TOP I PBTD 1727 f' *'OI VO V. fefiO y 1 1 2- LNR. , L -80, 0.0383 bpf, a: e.2ae' 9761 r.� �.�.� t i DATE REY BY COSIAEIAB GATE 1EV BY COAMENII8 PRUDHOE BAY UNIT 0311N8.1 OitlGaNALCOIlFLOWN M16/11 MBYJIAD ADDED SSSVSAFETYNENE WELL 34,28 =WI 813-QAA CONVERTED 10 CANVAS 0120112 TMNI*ID AOCED 1125 SAFETY NOW PERMIT Nm: x 1340300 02 5101 $18-1.G FINAL 07110/12 M88.14b 0 SET P)'N PLUG (07127112) API Noc 50029-2I085-G0 - Darman IIYIP CORRECTIONS se2QI12 TL& PJC P(LL PIN Sae. IL TUNl, R14€ .ICNGAX. CCORRECTIONS —_ 11 aP Bepaaaaon {Alaska) Page 4 of 4 • . • • Perforation Attachment ADL0028313 Well Date Perf Code MD Top MD Base TVD Top TVD Base X -26 2/19/89 APF 9280 9302 8787 8808 X -26 2/20/85 PER 9393 9413 8895 8914 X -26 2/20/85 PER 9423 9440 8924 8940 X -26 10/26/00 PER 9450 9482 8949 8980 X -26 10/26/00 SPS 9482 9483 8980 8981 X -26 10/26/00 SPS 9493 9542 8990 9037 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BRIDGE BPS PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF TREE. =* 4" OW • * WaLFEAD= NCEVOY SAN NOTES: H2S READINGS AVERAGE 125 ppm ACTUATOR= AXI1S ON X -2 6 WHOM ON MI. WELL REQUIRES A SSSV WHEN ON KB. aEV = 75.00' Mi. BF. ELEV = 39.90' kop= 3100' 1 - Max Angle = 26 CO 3800' 2161' 1--14-1/2* OTIS DBD SSSV NP, ID = 3.813" I Cetum1A3= 9372' • 1 [ filiTUMTVD= 8800' SS I 13-3/8" CSG, 72#, L-80, ID = 12.347" H 2676' I — A Minimum ID = 3.725" @ 9007' , I 8850' H4-1/2" OTIS XA SLIDING SLEEVE, D = 3.813" 4-1/2" OTIS XN NPPLE I I M t 8910' __ITBG SEAL ASSY W/G SEAL I 8034' —19 5/8' x 4-1/2" BOT PKR, 113 = 3813' I I L 8976' —14-1/2" OTIS X NP, ID = 3.813' I TOP OF r LNR --I 8982' 1 I I 9007' I —14-1/2" OTIS XN NP, N3 = 3.725" I 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, 13 = 3.958" --I 9039' I \ 9039' 1 4-1/ 7' TUBING TAIL I 1 I 9031' 1 — I ELMO Tf LOGGED 08/31/85 9-5/8" CSG, 47#, L-80, 13 = 8.681" H 9239' -4 • I 9360' --I MARKER JONT PERFORATION SUMMARY REF LOG: BHCS ON 03/13/84 ANGLE AT TOP PEFF: 18° @ 9280' I Note: Refer to Production DB for historical perf data SIZE SFF INTERVAL Opn/Sqz DATE 3-3/8" 6 9280 - 9302' 0 03/13/84 I 3-1/8" 4 9393 - 9413 0 03/1384 3-1/8' 4 9423 - 9440' 0 03/13/84 31/8" 4 9450 - 9483 S 10/26/00 EMENT 2-7/8" 4 9493 - 9542' C 10/26/00 OVONNT I 9442' ---1 C TOP *44**,4 tWAV4 avavavavavavava., 9482' H SAM) TOP I PBTO H 9727' WAW414 1•4•••••• ••••••••4 1 .0.0.0.0 7" LNR, 26#, L-80, 0.0383 bpf, 13 = 6,276" 1-1 9768' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/18/84 ORIGINAL COMPLETION 02/16/11 MB/JMD ADDED SSSV SAFETY NOTE WELL: X-26 02/22/01 SIS-QAA CONVERTED TO CANVAS 01/20/12 TMN/JMD ADDED H2S SAFETY NOTE PERMIT No: 5840300 02/26/01 SIS-LG FINAL 07/30/12 MSS/JMD SET PXN PLUG (07/27/12) API No: 50-029-21085-00 06/26/01 RN/TP CORRECTIONS 08/20/12 TQ/ PJC PULL PX74 Sec. 6, T1ON, R14E 07/13/02 7 JC/KAK CORRECTIONS BP Exploration (Alaska) Fri) 1. e 3 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com] Sent: Friday, October 05, 2012 9:35 AM l "1-5/11 To: Regg, James B (DOA); Wallace, Chris D (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C DHD Well Integrity Engineer; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Injector X -26 (PTD #1840300) Ready for POI All, The obstruction in the tubing of Injector X -26 (PTD # 1840300) has been cleared and the well is ready to be placed on injection. The well is reclassified Under Evaluation so it may be placed on injection. Once stabilized, an AOGCC witnessed MIT -IA will be performed. Thank you, Mehreen Vazir BPXA Well Integrity Coordinator SCANNED APR 1 7 2013 907 -659 -5102 From: AK, D &C Well Integrity Coordinator Sent: Tuesday, September 11, 2012 8:22 PM To: 'Regg, James B (DOA)'; Chris Wallace (chris.wallace(aalaska.gov); 'Schwartz, Guy L (DOA)'; AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C DHD Well Integrity Engineer; Walker, Greg (D &C) Subject: NOT OPERABLE: Injector X -26 (PTD #1840300) Suspected Hydrate Plug All, Injector X -26 (PTD # 1840300) is suspected to have formed a hydrate plug in the tubing as attempts to place the well on injection failed. Further remediation is needed at this time to remove the plug in order to place the well on injection. The well is reclassified to Not Operable until ready for injection. The well will be placed on the AOGCC Quarterly Injection Report. Thank you, Mehreen Vazir BPXA Well Integrity Coordinator 907 - 659 -5102 1 • • Wallace, Chris D (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWelIlntegrityCoordinator @bp.com] Sent: Tuesday, September 11, 2012 8:22 PM To: Regg, James B (DOA); Wallace, Chris D (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C DHD Well Integrity Engineer; Walker, Greg (D &C) Subject: NOT OPERABLE: Injector X -26 (PTD #1840300) Suspected Hydrate Plug All, Injector X - 26 (PTD # 1840300) is suspected to have formed a hydrate plug in the tubing as attempts to place the well on injection failed. Further remediation is needed at this time to remove the plug in order to place the well on injection. The well is reclassified to Not Operable until ready for injection. The well will be placed on the AOGCC Quarterly Injection Report. Thank you, Mehreen Vazir %AIRED MAY 0 7 2°13 BPXA Well Integrity Coordinator 907 - 659 -5102 From: AK, D &C Well Integrity Coordinator Sent: Wednesday, August 29, 2012 8:56 AM To: 'Regg, James B (DOA)'; Chris Wallace (chris.wallace(6 alaska.gov); 'Schwartz, Guy L (DOA)'; AK, OPS GC3&PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Wills, Shane M; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Injector X -26 (PTD #1840300) Passed MIT -IA Prior to Returning To Injection All, Injector X - 26 (PTD #1840300) passed a MIT - IA to 3500 psi while shut -in on 08/09/2012, after re- energizing the pack -off seals in the inner casing hangar. The passing test confirms the presence of 2 competent barriers in the wellbore. The well is reclassified as Under Evaluation to resume injection on the well. Plan forward: 1. Operations: Resume injection on miscible gas (M -I) 2. Full -bore: MIT -IA to 2500 psi once well is on injection and thermally stable A copy of the MIT -IA results are included for reference. 1 • • Wallace, Chris D (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator ©bp.com] Sent: Wednesday, August 29, 2012 8:56 AM To: Regg, James B (DOA); Wallace, Chris D (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Wills, Shane M; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: UNDER EVALUATION: Injector X -26 (PTD #1840300) Passed MIT -IA Prior to Returning To Injection Attachments: MIT PBU X -26 08- 09- 2012.xls All, Injector X -26 (PTD #1840300) passed a MIT -IA to 3500 psi while shut -in on 08/09/2012, after re- energizing the pack -off seals in the inner casing hangar. The passing test confirms the presence of 2 competent barriers in the wellbore. The well is reclassified as Under Evaluation to resume injection on the well. Plan forward: 1. Operations: Resume injection on miscible gas (M -I) 2. Full -bore: MIT -IA to 2500 psi once well is on injection and thermally stable A copy of the MIT -IA results are included for reference. «MIT PBU X -26 08- 09- 2012.xls» Please call if you have any questions or concerns. Thank you, Gerald Murphy BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator @BP.com From: AK, D &C Well Integrity Coordinator Sent: Sunday, July 29, 2012 1:47 PM To: 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Clingingsmith, Mike J; Arend, Jon (NORTHERN SOLUTIONS 1 • • LLC) Subject: NOT OPERABLE: Injector X -26 (PTD #1840300) Failed MIT -IA All, WAG injector X -26 (PTD #1840300) failed a MIT -IA to 4000 psi on 7/27/2012 showing slow IA by OA communication prior to an intended WAG swap. The failing test indicates a lack of 2 competent barriers in the well. A tubing tail plug had been set prior to the test, and a passing MIT -T to 2500 psi was obtained. The well had previously passed an AOGCC witnessed MIT -IA to 2500 psi on 11/29/2011. The well is reclassified as Not Operable. Plan forward: 1. Wellhead: Positive pressure pack -off test on the inner casing void — Failed on 7/28/2012 2. Wellhead: Attempt to re- energize wellhead seals 3. DHD: Repeat MIT -IA 4. WIE: Pending MIT -IA results, evaluate for a potential wellhead Seal -Tite treatment A copy of the TIO plot, injection plot and wellbore schematic are included for reference. Please call if you have questions or concerns. Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Email: AKDCWelllntegrityCoordinator (cr�BP.com 2 • Mot 1 ,4 o3vo Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Q611- 7(31' Sent: Sunday, July 29, 2012 1:47 PM To: Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; AK, OPS Well Pad CX; Black, Brittany Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Clingingsmith, Mike J; Arend, Jon (NORTHERN SOLUTIONS LLC) Subject: NOT OPERABLE: Injector X -26 (PTD #1840300) Failed MIT -IA Attachments: Injector X -26 (PTD #1840300) TIO and Injection Plot.docx; WAG Injector X -26 (PTD # 1840300) wellbore schematic.pdf All, WAG injector X -26 (PTD #1840300) failed a MIT -IA to 4000 psi on 7/27/2012 showing slow IA by OA communication prior to an intended WAG swap. The failing test indicates a lack of 2 competent barriers in the _ well. A tubing tail plug had been set prior to the test, and a passing MIT -T to 2500 psi was obtained. The well had previously passed an AOGCC witnessed MIT -IA to 2500 psi on 11/29/2011. The well is reclassified as Not Operable. Plan forward: 1. Wellhead: Positive pressure pack -off test on the inner casing void — Failed on 7/28/2012 2. Wellhead: Attempt to re- energize wellhead seals 3. DHD: Repeat MIT -IA 4. WIE: Pending MIT -IA results, evaluate for a potential wellhead Seal -Tite treatment A copy of the TIO plot, injection plot and wellbore schematic are included for reference. «Injector X -26 (PTD #1840300) TIO and Injection Plot.docx» «WAG Injector X -26 (PTD #1840300) wellbore schematic.pdf» Please call if you have questions or concerns. SCANNED MAY Z�1= Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Email: AKDCWeIIIntegrityCoordinator c� BP.com 1 • • • • PBU X -26 PTD #1840300 7/29/2012 TIO Pressures Plot w * 26 3. -.-110 t 6f 2C0J -BOA 00A + 000A 1 1 •iii 050Y'2 0602112 05.1912 052S12 060212 %%02 001612 002112 069312 010712 07nt12 072,12 072512 Injection Plot WI: x46 3222 Q0 500 3000 /v ^ } 2%0 1.100 ` 2600 1 vx 1.300 26:0 25.'0 I 200 23:0 I 2000 1100 2 207 2100 1'000 2000 1600 900 - ! 1604 c. II 1pr, - � I 'z 1.600 ; -600 ni . , SOO .. x.. t 2C0 H. I 60 ( 100' ! "'_ / I I 0 350522 051212 0511911 052612 0641712 060912 06^612 06'23^2 06,1012 071' ..1012 072 0777312 e I Tom= 4 WELLI.IEAC = MCEVOY SAFETY NOTES: H2S . , t3NGS AVERAGE 125 ppm ACTUATOR = AXELSON X -26 WHEN ON MI. WELL REQUIRES A SSSV WHEN ON KB, ELEV = 75,00' M1. BE ELEV = 39,90' KOP = 3100' - Max Angle = 26" 38t')0' - I 2161' H4 - 12" OTIS DBD SSSV NIP, ID = 3,813" Datum MD = 9372' ID Datum TVD= • 1tt'S S ` 13 -3/8" CSG, 72 #, L -80, ID = 12.347" , H 2676' HA , Minimum ID = 3.725" @ 9007' 8860' — 4 -12" OTIS XA SLIDING SLEEVE, ID = 3.813" 4-1/2" OTIS XN NIPPLE I I 8910' TBG SEAL ASSY W/G SEAL I M ►� ( 8934' — 9 5/8" x 4.1/2" BOT PKR, ID = 3 813" 8978' 4 -112" OTIS X NIP, ID= 3.813" – I TOP OF 7" LNR H 8982' 9007' 4-1/2" OTIS XN NIP, If = 3.725" 4 -12" TBG, 12.6#, L -80, 0'.0152 bpf, ID = 3,958" I- { 9039' 9039' H4 -1/2" TUBING TAIL l I 9031' — ELMD TT LOGGED 08/31/85 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 9239' I 9 I — MARKER JOINT PERFORATION SUMMARY REF LOG: BHCS ON 03/13/84 I ANGLE AT TOP IERF: 18° © 9280' Note: Refer to R DB for historical perf data SIZE SPF INTERVAL Opn/Sgz DATE I 3.3/8" 6 ` 9280 - 9302' 0 03/13/84 3-1/8" 4 9393 9413' 0 03/13/84 3-1/8" 4 9423 - 9440' 0 03/13/84 3-1/8" 4 9450 - 9483' S 10/25/00 2 -7/8" 4 9493 - 9542' C 1026100 1 ( 9442' --I CENEIT TOP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 ' •• A A., 2' SA ND TOP PBTD 9727' 1�1�l�1�1�1G�1 1 111111 I 111H11l+ l 7" LNR, 264, L 0383 bpf, ID = n 6_.2_ 76 --{ -9768 __ •• ' I••• ••• • • �1 1 - DATE REV BY ' COMIfVENTS DATE - REV BY COINVIEt'ITS F 3UDHOE BAY UNIT 03/18/84 ORIGINAL COMPLETION 02/16/11 MB/JMD ADDER SSSV SAFETY NOTE WELL X -26 0222/01 SIS -QAA CONVERTED TO CANVAS 01/20/12 TMTYJMID ADDED I-12S SAFETY NOTE PERMIT No '1840300 02/26/01 SIS-LG FINAL AR No: 50-029-21085-00 0626/01 RN/TP 'CORRECTIONS Sec. 6, Ti ON, R14E 07/13/02 JCJKAK ,CORRECTIONS BP Exploration (Alaska) • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, December 15, 2011 TO: Jim Regg P.I. Supervisor r �� `�`"/' 1 4111 SUBJECT: Mechanical Integrity Tests ( ( BP EXPLORATION (ALASKA) INC X -26 FROM: Lou Grimaldi PRUDHOE BAY UNIT X -26 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry . jj' — NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UNIT X - 26 API Well Number: 50 029 - 21085 - 00 - 00 Inspector Name: Lou Grimaldi - Insp Num: mitLG111130140224 Permit Number: 184 - 030 - Inspection Date: 11/29/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well X-26 - Type Inj. W TVD 8459 IA 550 2500 - 2495 2485 - P.T.D 1840300 ' TypeTest SPT I Test psi 2500 - OA 26 88 86 84 Interval 4YRTST P/F P ' Tubing 1545 1540 1515 1545 Notes: 3.2 Bbl's pumped, 2.9 retumed. Good test, approxately ten psi lost in second 15 minutes. Not considered excessive as it was within accepted tolerance of test gauge. Thursday, December 15, 2011 Page 1 of 1 MEMORANDUM • ~ ~ 1:~ TO: PimRpggisor ~~`~~ ~L'~il„ FROM: John Crisp Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, December 18, 2007 SliBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC X?6 PRUDHOE BAY UNIT X-26 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~~- Comm Well Name: PRUDHOE BAY UNIT X-26 Insp Num: mitJCr071217075104 Rel Insp Num: API Well Number: 50-029-21085-00-00 Permit Number: 184-030-0 Inspector Name: John Crisp Inspection Date: 12/16/2007 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~ x-z6 Type Inj. ' w TvD 84~ IA 140 4000 /~ 3960 ~ 3940 P T ]840300 ~TypeTeSt ~ SPT ~ TBSt pSl 2114.75 ~ OA 25 ~ 150 ~ 150 ~ 150 = Interval 4YRTST P~F P _ ~~ TllblIlg ~ 1500 ~ 1400 ~ - 1400 ~ 1400 Notes: 6.3 bbl's pumped for test. fi'r` ,'~~ JAS I. ~. ZQG Tuesday, December 18, 2007 Page ] of 1 e 0 og escnptlon ae o or P-27 11588703 MEM GLS 12/29/06 1 X-26 11536191 INJECTION PROFilE 12/31/06 1 W-17A 11588701 MEM PROD PROFILE 12/26/06 1 GNI-02A 11540232 INJECTIVITY STEP RATE 01/05/07 1 NK-21 11630446 PROD PROFilE 01/10/07 1 NK-10 11638606 INJECTION PROFILE 01/13/07 1 D-16 11555035 PROD PROFilE 12/26/06 1 l5-25 11538589 lDL 12/28/06 1 Y-16 11626467 lDL 01/19/07 1 L-04 11603118 MEM lDl 12/30/06 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth UIc" 1~1'-C53Ò WII J b# l D PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Cr"ANNED FEB 2 1 2007 Petrotechnical Data Center LR2-1 ~ . 900 E. Benson Blvd Anchorage, Alaska 99508 Date Delivered: 02/12/2007 NO. 4131 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay D t CI . CD Bl . Alaska Data & Consultin 2525 Gambell Street, Suit Anchorage, AK 99503-2 ATTN: Beth Received by: FEB 2 0 zam ¡ I ,~!a,~k~ QiI .( \ f STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Winton_Aubert@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration (Alaska) Inc. Prudhoe Bay I PBU / X Pad 12/22/03 Anna Dube Witnessing declined by John Crisp Packer Depth Pretest Initial 15 Min. 30 Min. Well X-26 Type Inj. F TVD 8,459' Tubing 1,850 1,850 1,850 1,850 Interval 4 P.T.D. 1840300 Type test P Test psi 2,115 Casing 50 2,500 2,460 2,450 P/F P Notes: 4-Year required test. AOGCC representative declined witnessing test. Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Well Type Ini. TVD TubinQ Interval P.T.D. Type test Test psi CasinQ P/F Notes: Well Typelni. TVD Tubing Interval P.T.D. Type test Test psi CasinQ P/F Notes: Well Typelni. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover a = Other (describe in notes) ~t~NEt: ÐEe ~ 1 2003 MIT Report Form Revised: 06/19/02 2003-1222_MIT _PBU_X-26.xls C. V~ C~atterton December 16, 1986 Cha',~.~ n ~ D.BDF.89 Lonnie C. Smith Commissioner Bobby D. Foster Petroleum Inspector Mech Integrity Test SAPC PBU Pads S, M, U, R, N, T, Y, H, F, X Prudhoe Oil Pool Wednesday, November 19, 1986: The tests began at 7:00 a.m. and were concluded for the day at 4:30 p.m. with 1Owel'ls being tested. Thursday, N.o. vember .20, 1986.: The tests began at 7:00 a.m. and were concluded for the day at 7:00 p.m. with l'4"~wells being tested. Friday, November 21, 1986: The tests began at 6:30 a.m. and were concluded for the day at 4:30 p.m. with 10?'wells being tested. ~aturday.,. Nov.embe~r..22,..198.6: The tests began at 6:30 a.m. and were concluded at 1:00 p.m.; and were resumed at 6:00 p.m. and concluded for the day at 9:00 p.m. ~-£ As the attached mechanical integrity tes_t ~ports show, were tested, all of which met theJAOGCC regulations. In summary, I witnessed the mechanical integrity tests on Standard Alaska Production Company's injections wells listed on the attached test forms. sGANNED DEC Attachments AIJ~KA OIL AND, GAS CONSERVATION ~SSION MEG-t~ICAL IN'I'E~LITY TEST ! PRETEST STAKr 15 MIN 30 M-IN! *P *I TYPE OF PKR CASING TBG REQ "TBG TIME TIME TIME WELL *S --- ANNULUS TVD SIZE/WT/GRADE SIZE TEST CSG. TBG TBG TBG C~ ~! ~ FIIIID 1~ PRESS PRESS CSG CSG CSG '- PRESS PRESS PRESS . .' ,, ,,, · . _ : : ii , , P -. P~ WATER. INJ DIF..%7~ ', ~..q"2_ S = SALT WATER INJ GLYCOL C(1MPANY REP SIGNATURE M - M~~ n~r~ON SALT WATEa ~' -~ - I = INJF..CrII, tG DR'rrLING MUD ~~ 20 AAC 25.030(a) N - NOT I1%IFL'rIN3 OTHER 20 AAC 25.412(c) ' OTHER 20 AAC 25.252(d) STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Pedorate_ Sand Plug/Schmoo Treatment Pa, tubing _ Alter casing_ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) BP Exploration (Alaska), Inc. Development__ RKB 75 feet 3. Address Explorato~__ 7. Unit or Property name P. O. Box 196612 Stratigraphic__ Anchorage, AK 99519-6612 service__x Prudhoe Bay Unit 4. Location of well at surface 8. Well number 200' FSL, 617' FEL, Sec. 06, T10N, R14E, UM (asp's665261, 594O316) X-26 At top of productive interval 9. Permit number / approval number n/a --- WAG Well (asp's n/a) i84-030 At effective depth 10. APl number 479' FSL, 1977' FWL, Sec. 06, T1 ON, R14E, UM (asp's 662814, 5940542) 50-029-21085 At total depth 11. Field / Pool 523' FSL, 1877' FWL, Sec. 06, T1 ON, R14E, UM (asp's 662713, 5940584) Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 9751 feet Plugs (measured) Cement Top @ 9442'. (10/26/2000) true vertical 9236 feet Effective depth: measured 9390 feet Junk (measured) Tagged TD @ 9390' w/2.5" Cent & Sample Bailer true vertical 8892 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 110' 20" x 30" 72 c.f. 145' 145' Surface 2641' 13-3/8" 3813 c.f. 2676' 2676' Intermediate 9205' 9-5/8" 2159 c.f. 9240' 8749' Liner 769' 7" 320 c.f. 8982' - 9751' 8504' - 9236' RECEIVED Perforation depth: measured Open Perfs 92e0'- 9302', 9393'- 9413', 9423' - 9440',JUL 0 001 Below Cement Top 9450' - 9483', 9493' - 9542' true vertical Open Perfs 8787' - 8808', 8895' - 8914', 8924' - 8940', Alaska 0ii & Gas Cons. Commission Below Cement Top 8949' - 8981', 8990' - 9037' Anchorage Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 TBG @ 8910' MD. TBG Seal Assy W/G @ 8910'. Tubing Tail @ 9039'. Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" BeT PKR @ 8934'. 4-1/2" Otis DBD SSSV NP @ 2161' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations __ Oil __ Gas __ Suspended __ Service _Water & Gas Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. DeWayne R. Schff'orr ~,, Prepared by DeWayne R. Schnorr 564-5174 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE~~ X-26 DESCRIPTION OF WORK COMPLETED' NRWO OPERATIONS 0/18/2O0O 0/22/200O O/25/2OOO 0/26/2000 O/29/2000 2/17/2000 2/15/2001 2/16/2001 3/ 2/2001 SAND PLUG: SBG DISPERSANT TREATMENT SAND PLUG: D/T W/3.62" CENT TO 9576' ELM (34' RH) (PRE ST SD PLUG) SAND PLUG: SANDPLUG/CEMENT CAP SAND PLUG: SANDBACK/CEMENT CAP SAND PLUG: TAG CEMENT TOP(POST SAND PLUG) SCHMOO B GONE: SBG TREAT SCHMOO B GONE: PERFORM SBG SCHMOO B GONE: FINISH SBG FLUSH SSSV C/O OR STROKE: SET ISSSV (MCX) 10/18/00 10/22/00 10/25/00 10/26/00 10/29/00 12/17/00 02/15/01 02/16/01 03/02/01 EVENT SUMMARY PUMP 157 BBLS SGB TREATMENT. LET SOAK FOR 3 HRS. PUMP 200 BBLS DRIFTED WITH TEL & 3.625" CENTRALIZER TO TD @ 9539' WLM (9576' CORRECTED). 34' RATHOLE. RIH, TIE INTO TT, RIH TAG TD AT 9617 ELMD, PU PAINT FLAG, CHECK TIEIN, POOH. MU SHEAR NOZZLE, RIH ..... CONTINUE CPS RERUN TIEIN, RIH W/SHEAR NOZZLE, JET PERFS, SANDBACK TO 9482, PLACE 1.5 BBLS CEMENT TO 9442, HESITATE, POOH AND FREEZE PROTECT TUBING. NOTIFY PAD OPERATOR, NEED TO LEAVE WELL SHUTIN UNTIL 1800 HRS,0N 10/28/00. TAGGED PBTD @ 9388' ELM WITH A 3.5" CENT TAGGED PBTD @ 9390' ELM WITH A 2.5" CENT & SAMPLE BAILER, GOOD SAMPLE OF MOSTLY INJECTOR SHMOO WITH VERY LITTLE FRAC SAND AND CEMENT PUMPED SBG PER PROCEDURE. PAD OPERATOR TO RETURN TO INJECTION. 183 BBLS SBG, SHUT DOWN BECAUSE OF WEATHER DID NOT FLUSH FINISH SBG SET 4-1/2" MCX (# M-02) @ 2143' WLMD. BLED TBG DOWN FROM 2200 PSI TO 1600 PSI. HELD FOR 15 MINUTES. GOOD TEST RETURN WELL TO INJECTION Page 1 Fluids Pumped 4 DIESEL FOR PRESSURE TESTING SURFACE EQUIPMENT 200 PRODUCED WATER 526 SCHMOO B GONE 206 METHANOL · 5 50/50 METHANOL WATER 119 SLICK KCL WATER 3 GEL 4 SEA WATER 200 SALT WATER 151 FRESH WATER 1.5 CEMENT 15.8 PPG 322.5 SLURRY 1742 TOTAL Page 2 ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT SUNDRY WELL OP[._ ATIONS 1. Operations performed: Operation shutdown~ Pull tubing__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 200' NSL, 617' WEL, SEC. 06, TION, R14E, UPM At top of productive interval N/A - water iniection well At effective depth 498' NSL, 3102' WEL, SEC. 06, TION, R14E, UPM At total depth 527' NSL, 3165' WEL, SEC. 06, TION, R14E, UPM Stimulate X Plugging__ Perforate.. Alter casing __ Repair well Other__ 5. Type of Well: Development __ Exploratory __ Stratigraphic __ Service X 6. Datum elevation (DF or KB) KBE = 75.00 AMSL 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number X-26 (24-06-10-14) PBU 9. Permit number/approval number 84-30 / 10. APl number 50- 029-21085 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9770 feet BKB 9254 feet 9540 feet BKB 9035 feet Plugs (measured) Junk (measured) fill at 9540' MD (11/88) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth -- 110 20 x 30 8 c.v. 145 2641 13 3/8 3813 c.f. 2676 9205 9 5/8 2159 c.f. 9240 __ 788 7 320 c.f. 8982-9770 measured 9280'- 9302' (Sag R) .g,9.q,9'-.g41R'. .g42,9'-.q44(~'_ ,g4,~O'-.q4R,9'_ .g4.q,9'-.q,~42' I'lvi.~h~k) true verticalsubsea 8712'-8733' (Sag R) 8820'-8962' (four Ivishak intervals) Tubing (size, grade, and measured depth)4 1/2" L-80 to 8934' with 4 1/2" tailpipe to 9039' Packers and SSSV (type and measured depth)9 5/8" BOTpacker at 8934'; 4 1/2" BVN at 2162' 13. Stimulation or cement squeeze summary See Attachment -True vertical depth BKB 145 2676 8749 8504-9254 14. Intervals treated (measured) Treatment description including volumes used and final pressur6 Representative Daily Average Production or Injection ~~ Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 16438 2254 Subsequent to operation 16068 2167 15. Attachments I 16. Status of well classification as: Copies of Logs and Surveys run. J Daily Report of//Well Operations? I ~? Oil~ Gas Suspended 17. I hecr, e~y~ce~ that(~the forej~f~g .,s true and,,~ect to the best of my knowledge. si~ned ~ Title ' ' Form 10-404 R~v 06/15/8'-8 ' " Service water iniection well SUBMIT IN DUPLIC~ X-26 DESCRIPTION OF WORK COMPLETED Stimulation Operation 1 O/22/99 A Acid Stimulation Treatment was performed using the following fluids: SUMMARY Perform tubing wash for up coming CTU work. Rig up ad P-T hardline. Safety Meeting and S.I Well. Flush out pump and hardline. RDMO. Job went well. Notified Pad Operator and GC-3 to put Well back on injection at 2400 hrs. That will allow a 6 hour soak. Also, after injecting for 24 hrs. to S.I. Well and freeze protect P-W line and tubing. Fluids Pumped BBLS. Description 157 Surfactant 30.55 Schmoo Be Gone 130 Fresh Water (170 deg.) 2 Neat 319.55 Total Pumped STATE OF ALASKA ALASi ')IL AND GAS CONSERVATION COMMISSIO REPORT O'F SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 200'NSL, 617' WEL, SEC. 06, TION, R14E, UPM At top of productive interval N/A - water injection well At effective depth 498'NSL, 3102' WEL, SEC. 06, TION, R14E, UPM At total depth 527'NSL, 3165' WEL, SEC. 06, TION, R14E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service X 6. Datum elevation (DF or KB) KBE = 75.00 AMSL feet .7. Unit or Property name Prudhoe Bay Unit 8. Well number X-26 (24-06-10-14) PBU 9. Permit number/approval number 84-30 / 10. APl number 50- 029-21085 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical 9770 feet BKB 9254 feet Plugs (measured) Effective depth: measured true vertical 9540 feet BKB 9035 feet Junk (measured) fill at 9540' MD (11/88) Casing Length Structural -- Conductor 110 Surface 2641 Intermediate 9205 Production -- Liner 788 Perforation depth: measured Size Cemented Measured depth 145 2676 9240 20 x 30 8 c.y. 13 3/8 3813 c.f. 9 5/8 2159 c.f. 7 320 c.f. 8982-9770 9280'- 9302' (Sag R) 9393'-9413', 9423'-9440', 9450'-9483', 9493'-9542' (Ivishak) true vertical subsea 8712'-8733' (Sag R) 8820'-8962' (four Ivishak intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8934' with 4 1/2" tailpipe to 9039' True vertical depth BKB 145 2676 8749 8504-9254 RECEIVED jUN 2 8 i99 Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 8934'; 4 1/2" BVN at 2162' Gas Cons. Commis~ Anchoraae 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 16438 16068 2254 2167 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service water in_iection well 17. I hereby certify that the foregoing-is true and correct to the best of my knowledge. Signed Title SeniorTechnicalAssistantl :orm lO-;fO-~ Rev 06/15/88 7 SUBMIT IN DdPLI~ATE joil 5~2~3 WELL X-26i(24-06-10-14) Stimulation Oneration A CO & HCL Acid Wash Treatment was performed using the following fluids: SUMMARY RIH JETTING TBG. JETTED LINER, TAGGING TD AT 9720 CTD. PUMPED 34 BL BIOZAN WITH CHOKE WIDE OPEN TO SLOP TANK. CHASE BIOZAN WITH 170BBL SW. RTNS CAME CLEAN. PUMPED 39 BBL 15%HCL WITH 10% XYLENE. PRE-ACID NJECTION RATE 2 BPM @940, POST ACID RATE 1.8 BPM @420. POOH, POI, F/P, RD. PRE-INJECTION RATE FROM SCADA 16.3 M @ 2350, POST INJECTION RATE 16.7 M @ 2147. fjh 6/25/94 FLUIDS 584 BBLS SW 39 15% HCL ACID W/10% XYLENE 34 BBLS DUO POLYMER 23 BBLS MEOH (FREETF. PROTECTION CT) JUt,~ 2 8 1994 .~.ok~" gl! & 6as Cons. 6ommJssior~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 05/25/93 T# 84580 BPX/PBU~OGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at A-04'''''0~~ PFC 05/13/93 ~1 B-07~'O~ PRODUCTION LOG' 05/11/93 #1 C-29~'~~ CNA 05/12/93 #1 C-42~5~ STATIC 05/12/93 %1 E-07~O'~PROD-F 05/12/93 ~1 E-13~'~N PRODUCTION LOG 05/12/93 %1 E-20~--~ PROD-F 05/13/93 #1 F-11~--~O~ PROD-F 05/10/93 ~1 F-16~q~ CNn 05/11/93 ~1 F-17~--%~ PFC 05/10/93 ~1 F-429~-~%~ PRODUCTION LOG 05/09/93 %1 F-46~-%~ PDK-100 05/08/93 ~1 H-l?~-~0 PROD-F 05/09/93 ~1 M-21~-~ TUBING CUTTER 05/19/93 ~1 M-26A~ GR 05/11/93 #1 P-04~{-~ PFC 05/18/93 ~1 R-30~-Q~ PFC 05/16/93 #1 S-07A~,9~SPINNER/TEMP 05/14/93 #1 X-26~ '~" ~, INJ/TEMP 05/20/93 #1 below. If you have any (907) 564-4004. 10500.00-10893.00 ATLAS 5 " 11540.00-11785.00 ATLAS 5 " 11000.00-11811.00 ATLAS 5 " 8750.00- 9852.00 ATLAS 5 " 9050.00- 9400.00 ATLAS 5 " 11000.00-11350.00 ATLAS 5 " 9700.00-10140.00 ATLAS 5 " 9200.00- 9500.00 ATLAS 5 " 8830.00- 9564.00 ATLAS 5 " 10380.00-11165.00 ATLAS 5 " 2158.00-11300.00 ATLAS 5 " 9000.00- 9383.00 ATLAS 5 " 10260.00-10720.00 ATLAS 5 " 8400.00- 8474.00 ATLAS 5 " 9100.00-11110.00 ATLAS 5 " 11400.00-11750.00 ATLAS 5 " 11130.00-11400.00 ATLAS 5 " 0.00-10916.00 ATLAS 2/5" 9100.00- 9680.00 ATLAS 5 " Information Control Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/30/22 T# 84193 BP/ PBU CH (PRODUCTION) LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. B-12 fS'~/ PRODUCTION LOG 12/22/92 #1 D-16~/-/~/ PFC 12/20/92 #1 M-18 82-18! CCL 12/23/92 #1 M-19 g~'~ CCL 12/23/92 #1 P-14 ~/-~ PRODUCTION LOG 12/23/92 ~1 R-08 8/--( PFC 12/19/92 #1 R-10 ~/-~ PRODUCTION LOG 12/20/92 #1 R-25~$-~ PRODUCTION LOG 12/19/92 #1 X-03 ~-~ PRODUCTION LOG 12/21/92 #1 X- 195/-~62 CCL 12/24/92 #1 X-26~-~ PRODUCTION LOG 12/21/92 #1 Y-31 ~/.j-~ PDK-100 12/19/92 #1 7570.00-10028.00 ATLAS 5 " 9000.00- 9350.00 ATLAS 5 " 9650.00- 9880.00 ATLAS 5 " 8220.00- 8320.00 ATLAS 5 " 9450.00- 9540.00 ATLAS 5 " 10100.00-10285.00 ATLAS 5 " 10830.00-11090.00 ATLAS 5 " 9900.00-10350.00 ATLAS 5 " 10050.00-10680.00 ATLAS 5 " 11350.00-12000.00 ATLAS 5 " 9020.00- 9107.00 ATLAS 5 " 500.00- 965'0.00 ATLAS 5 " 10200.00-10503.00 ATLAS 5 " Information Control Well Records JAN 0 4 199 5 Alaska 011 & Gas Cons, BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/04/92 T# 84148 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-06 '~'/~ PROD-F 09/14/92 #1 A-16 ~--1~3 INJF 10/17/92 #1 D-16~;--/~;, TEMP 10/16/92 #1 E-21 ~--~ LEAK DET H-26 ~-A~ PROD-F 10/26/92 ~-~ R-31 TE~ ~'--;~3 10/16/92 ~1~ - 10700.00-11010.00 CAMCO 5 " 10500.00-11079.00 CAMCO 5 " 9300.00- 9897.00 CAMCO 5 " 9100.00-10580.00 CAMCO 5 " 9600.00- 9900.00 CAMCO 5 " 9700.00-10462.00 CAMCO 5 " 9200.00- 9730.00 CAMCO 5 " Information Control Well Records EIVED DEC 1 8 1992 '%laska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 RECEIVED OCT 1 8 1991 ~aska Oil & Gas Cons. Commission Anchorage BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well . Records at (907) 564-4004. . DATE: 10/10/91 T# 82910 ~'%M-t6'~'~ PITS 09/20/91 ~1 10860.00 3~-~ B-22/ PITS 09/07/91 ~1 10800.00 9[-tf Y-30~"' CCL 09/16/91 ~1 8650.000 ~o-~ Y-29~'~ CCL 09/16/91 ~1 10131.00 ~3-3~jN-19 ~ CCL 09/25/91 #1 9000.000 ~-~W-38/' GAS LIFT SURVEY 09/15/91 ~1 200.0000 ~Z-/?&B-21~ PROD-F 08/13/91 ~1 9550.000 ~1-90 Y~26--- GAS LIFT SURVEY 09/16/91 ~1 5400.000 ~-~0 X-26~' INJ 09/24/91 ~1 9150.000 ~~-05~_ CL 09/07/91 ~1 9100.000 ~9-~K-06~ INJ 09/11/91 #1 9800.000 %~-~KL02Au/ PROD-F 08/24/91 ~1 11000.00 Fg-f~W-09/ GR 09/11/91 ~1 14200.00 ~-&~E.-03/ PROD-F 09/25/91 ~1 12450.00 ~o-~6 W-16v/ LEAK DET 09/19/91 ~1 2000.000 ~-/~-22~/ PROD-F 08/20/91 ~1 10350.00 ~/-~O B-32u/' TEMP 09/15/91 ~1 10275.00 T3-~7 C-04~ P~OD-F 08/24/91 #1 10350.00 ?~-~7~G-26~ CL 09/04/91 ~1 10200.00 ~2~?B-20~ LEAK DET 08/23/91. ~1 7992.000 ~-I~P-20 / LEAK DET 08/23/91 ~1 11800.00 7~ ~-04~', GAS LIFT SURVEY 09/04/91 ~1 3200.000 ~~H-18~ PROD-F 09/25/91 #1 9250.000 ~'~ W-37~ PROD-F 09/15/91 #1 9800.000 ~'[93S-0'5/ CA 09/15/91 ~1 9500.000 ¥~-I~F-2~ TEMP 09/03/91 ~1 11800.00 \ ~M-16~ PROD-F 08/26/91 ~1 10850.00 ¥$~R-04~' GAS LIFT SURVEY 08/26/91 ~1 2500.000 ~ B-32~ INJ 09/06/91 ~1 10240.00 ~9-$.0W-26 ~' JEWELRY LOG 08/22/91 ~1 CAMCO 5 JEWELRY LOG CAMCO 5 CAMCO 5 08/21/91 #1 08/23/91 10900. 12550. 9950.0 11444.00 CAMCO 11140.00 CAMCO 9240.000 CAMCO 12500.00 CAMCO 9755.000 CAMCO 4000.000 CAMCO 9850.000 CAMCO 10986.00 CAMCO 9680.000 CAMCO 10941.00 CAMCO 10279.00 CAMCO 11480.00 CAMCO 15162.00 CAMCO 12685.00 CAMCO 11270.00 CAMCO 10720.00 CAMCO 10953.00 CAMCO 10660.00 CAMCO 10522.00 CAMCO 9062.000 CAMCO 12553.00 CAMCO 8639.000 CAMCO 9722.000 CAMCO 10100.00 CAMCO 10224.00 CAMCO 12175.00 CAMCO 11150.00 CAMCO 9821.000 CAMCO 10807.00 CAMCO 00 11758.00 00 13284.00 00 10120.00 5 5 5 5 5 2 5 5 5 5 5 5 5 5 2/5 5 5 5 5 5 5 5 5 5 5 5 2/5 5 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/19/91 T#:82655 FROM' Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. PITS 07/06/91 #1 9100-9478 Camco 5" Temp 07/04/91 #1 9200-9413 Camco 5" GR 07/09/91 #1 8750-9269 Camco 5" Temp 07/04/91 #1 50-9800 Camco 5" Temp 07/05/91 #1 9000-9433 Camco 5" Temp 07/05/91 #1 8800-9500 Camco 5" Jewelry Tie-In 07/07/91 #1 10550-11288 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JUL 2 3 199i Alaska Oil & Gas Cons. Commiscicn Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/12/90 T#:81343 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-44,!.5. F-26 GR/TEMP .06/17/90 #2 10250-10530 Camco 5" F-27 PROD-F 06/08/90 #1 10300-10570 Camco 5" M-19 GR/TIE-IN 07/01/90 #1 9500-10502 Camco 5" M-13 GR 06/25/90 #1 9200-9880 Camco 5" 'R-08 TEMP 06/14/90 - ¢1 - 10900-11170 Cam, so - W-17 TEMP 06/16/90 #1 Surf-3000 Camco 5" X-23 INJ 06/27/90 #1 11250-11700 Camco 5" X-26 INJ 06/28/90 #1 9150-9515 Camco 5" Y-04 CCL 06/16/90 #1 9100-10100 Camco 5" Z-22 PROD-F 06/23/90 #1 13600-14050 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESER_V__OI R ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc,. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES . Date: 04/17/89 TS: 79969 BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: C-23 -Prod-F 03/25/89 $1 9800-10170 Camco 5" D-04A PITS 03/22/89 $1 10300-10600 Camco 5' E-14 Prod-F 03/31/89 $1 11400-11680 Camco 5' H-02 CCL/GR 03/15/89 $1 7600-9100 Camco 5' M-06 Spin Temp 03/27/89 ~1 2500-11248 Camco 5' M-29 Inj-F 03/18/89 $1 9450-10210 Camco 5' S-18 Leak Der 03/17/89 $1 50-11550 Camco 2"/5' W-17 CNL-GR 04/11/89 91 11350-11850 Sch 5' X-26 Inj-F 03/17/89 91 9200-9530 Camco 5' Z-31 Prod-F 03/16/89 91 12900-13196 Camco 5' & 6~s Con.% Commission Anchorage Received: Information Control Well Records LR2-1 Date: J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 February 27, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well X-26 (24-06-10-14) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, B. J. Policky Supervisor Waterflood & Miscible Flood BJP:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File ' STATE OF ALASKA A~'~KA OIL AND GAS CONSERVATION COMMIS~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown . Stimulate Plugging Perforate Pull tubing .. 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 200' NSL, 617' WEL, SEC. 06, TION, R14E, UPM At top of productive interval N/A - water injection well At effective depth 498' NSL, 3102' WEL, SEC. 06, TION, R14E, UPM At total depth 527, NSL, 3165' WEL, SEC. 06, TION, R14E, UPM 12. Present well condition summary Total depth: measured true vertical BKB Alter casing 9770feet 9254feet Repair well 5. Type of Well: Development ~ Exploratory Stratigraphic Service Plugs (measured) Other 6. Datum elevation (DF or KB) KBE = 75.00 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number X-26 (24-06-10-14) PBU 9. Permit number/approval number 84-3O / 9-079 10. APl number 50- 029-21085 ~ 1. Field/Pool - Prudhoe Oil Pool Effective depth: measured true vertical 9540feet BKB 9035feet Junk (measured) fill at 9540' MD (11/88) Casing Length Structural -- Conductor 110 Surface 2641 Intermediate 9205 Production -- Liner 788 Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Size Cemented Measured depth 145 2676 9240 20x30 8 c.y. 13 3/8 3813 c.f. 9 5/8 2159 c.f. 7 320 c.f. 8982-9770 9280'- 9302' (Sag R) 9393'-9413', 9423'-9440', 9450'-9483', 9493'-9542' (Ivishak) subsea 8712'-8733' (Sag R) 8820'-8962' (four Ivishak intervals) 4 1/2" L-80 to 8934'with 4 1/2"tallpipe to 9039' True vertical depth BKB 145 2676 8749 8504-9254 Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 8934'; 4 1/2" BVN at 2162' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Reoresentative Daily Avera3e Production or In!ection D~I . ~ ....... OiI-Bbl Gas-Md- Water-Bbl Casing Pressure ~U~Cl~r~ssure Prior to well operation 6165 1600 Subsequent to operation 6320 1600 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil Gas Suspended Service water in. iection well 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~_ ~,~- ~/f'? ~,~ ~. t~.3". ~o I; c ~: ~ Title Supervisor Waterflood/Miscible Flood Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE WELL X.26 (24-06.10.14~ PBU ADD~L. PERFORATION OPERATIONS The following Sag River interval was perforated February 19, 1989 using Schlumberger 3 3/8" carrier guns at 6 spf: 9280' - 9302' MD BKB (Ref. BHCS, 3/13/84) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to injection immediately following perforating operations, then tested. jm 2/24/89 .- BP EXPLORATION HOUSTO~ BP Explora~on (Alaska) 900 East Benson I~ulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) .561-5111 INDEXED A~CO CHEVRON E~%ON TEXACO MOBIL 0 ei'e: 02-22-89 79838 PHILLIPS ST.A'I~ OF ALASKA GEOSCIENCES RESERVOIR 'REFERENCE: ARCHIVES B~ CASED HOLE FINAL LOGS The following ma,eriai is being submi,,ed herewi,h. Please acknowledge receip, by signing a copy of ,his letter and re, urning I, ~o ,his office: _ · . C-12 ' PROD-F #1 11300-11985 .X-06 I PERF #2 11960-12308 X-'10 PROD-F #1 10400-10960 X-26 PERF #1 8900-9400 Y-24 Completion #1 12700- 02-16-89 02-17-89 02-13-89 02-19-89 02-18-89 Sch Sch Sch Sch Sch 511 5" 5" 5" Received Shirley R. McCurry I NFO~MAT I ON CONTROL 'He i ! Records LR2- i Standard Alaska Production Company _ 900 East Benson Bouleva~t:~,~w P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 23, 1989 STANDARD ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, Approvals, Well X-26 (24-06-10-14) PBU in triplicate, is Form 10-403, Application for Sundry for the above-named well. This contains our proposal to perforate the well. BJP:JAM Enclosures (g) cc: L. Burke (MB12-1) Well File Yours very truly, B. ~ Po~cky,-Supervisor Waterflood & Miscible Flood A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA A'~KA OIL AND GAS CONSERVATION COMMIS'~,,~N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend Alter c,~ing Repair well Change approved program __ 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 200'NSL, 617'WEL, SEC. 06, TION, R14E, UPM At top of productive interval N/A - water injection well At effective depth 498' NSL, 3102' WEL, SEC. 06, TION, R14E, UPM At total depth 527' NSL, 3165' WEI_, SEC. 06, TION, R14E, UPM 12. Present well condition summary Total depth: measured 9770 feet true vertical. BKB 9254 feet operation Shutdown ~ Re-enter suspended well~ Plugging ~ Time extension ~ Stimulate ~ Pull tubing.. Variance~ Perforate X_ Other~ 5. Type of Well: 6. Datum elevation (DF or KB) Development. x KBE = 75.00 AMSL feet Exploratory ~ StralJgraphi¢~ 7. Unit or Property name' Service__ - Prudhoe Bay Unit 8. Well' number X-26 (24-06-10-14) PBU 9. Permit number 84-30 10. APl number 50- 029-21085 il 1. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 9540 feet Junk (measured) fill at 9540' MD (11/88) true vertical BKB 9035 feet Casing Length Size cemented Measured depth Structural -- Conductor 110 20 x 30 8 c.y. 145 Surface 2641 13 3/8 3813 c.f. 2676 Intermediate 9205 9 5/8 2159 c.f. 9240 Production -- Liner 788 7 320 c.f. 8982-9770 Perforation depth: measured 9393'-9413', 9423'-9440', 9450'-9483', 9493'-9542' true vertical subsea 8820'-8962' (four intervals) Tubing (size. grade, and measured depth) 4 1/2" L-80 to 8934' with 4 1/2" tailpipe to 9039' Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 8934'; 4 1/2" BVN at 2162' True vertical depth BKB 145 2676 8749 8504-9254 CulThi~,,$~,OB 0il & Gas Cons. ~, ~ ~ .i- ~ ' ~ ~ch0mge. 13. Attachments Description summary of proposal x: Detailed operations program BOP sketch X 14. Estimated date for commencing operation February 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil ~ Gas ~ Suspended Service water injection well 17. I hereby certify that the foregoing is trj4e and correct to the best of my knowledge. Sic~nod~fJ~ Title Supervisor Waterf/ood/Miscible Flood '~ ~ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test~ Location clearance ~ Mechanical Integrity Test Approved by order of the Commission F°rm 10-403 Rev 06/15/88 Date ~,,,',,~./~'. IApproval No. ~ _ ~ 7~;; u,u t for. a3~:iuired 10-, ?c) / - '_._,/ , {~?,~/,~~~ Commissioner --,.~c..~ oved Copy 'Returned WELL X-26 (24-06-10-14~ PBU ADD'L. PERFORATIQN PROPQSAL We propose to perforate the following Sag River interval during February 1989: 9280' - 9302' MD BKB (Ref. BHCS, 3/13/84) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to injection immediatelY following perforating operations, then tested. jm 1/18/89 FLOW TUBES & PACKOFF BOWEN PACKOFF ~ j-,-- HAND PUMP FLOWLINE FLOWLINE VALVE -- GREASE SEAL FLOWTUBE GREASE LINE GREASE /'~- MANIFOLD ~G'REASE II PUMP RISER '----'-'--':--- ~R G R EASE . ESERVOIR BOP' INOEXED HOUSTON ARCO S-fflNDARD CHEVY. ON ALASKA PRODUCTION E>C(ON O~te: 11-23-88 TEXACO TO: ri: 79577 MOBIL PHILLIPs STATE OF ~LASKA ! ARCHIVES REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: D-~'7 H-12 H-23 H-29 X-26 Y-15 E-19 Z-02 W-37 .D-24 N~03 B-26 S ta°tic Gradient Static Gradient Static Gradient Static Gradient Static Gradient Flowing Gradient Pump-In Survey Press. Buildup Flowing Gradient Static Gradient S tatic Gradient Flowing Gradient 11-07-88 Camco 11-06-88 Camco 11-05-88 Camco 11-01-88 Camco 11-02-88 Camco 11-07-88 Camco 10-28-88 Gearhart 10-15-88 Gearhart 10-28-88 Camco 11201-88 Camco 11-15-88 Camco 11-11-88 - Camco Received Shirley R. McCurry ! NFORPLAT I ON CONTROl_ Wel I Records LR2-1 INDEXED TO: DALLAS ARCO CHEVRON EX~"~ON TEXACO MOBIL GEOSCIENCES STANDARD ALASKA PRODU,--. TION D~te: 06/09/86 TI: 77102 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The roi lowing material is being submlt-fed herewith. Please acknowledge receipt by slgning e copy of this let-ret and returnlng It to thls office: -'~ A-31 '- A-32 --A-33 '~A-33 ~ B-30 ~C-15 ~E-6 ~ E-19 ~F-6 -.OF-24 ~F-24 '- G-16 ~J-6 "J N-4A '~R-9 '-U-10 ~X-tA --X-26 ~X-27 03/29/86 04/24-26/86 03/28/86 04/14/86 PBU 03/29/86 Static Gradient 04/17/86 Static Gradient 05/10/86 Static Gradient 05/10/86 Static Gradient r.,~ 03/27~_ r/~Camco Flowing Gradient ~/~ 05/03-~0_5/8~' ~Camco BHPD & Pres. Drawdown-05/05~86 Camco Static Gradient 05/08/86 Camco Static Gradient 04/17/86 Camco BF3D & Flowing Gradient 04/21/86 Camco --S :a:i6 Gradient 03/28/86 Camco Static Gradient 04/27/86 Camco " " 04/30/86 Camco " " 05/07/86 Camco " " 03/30/86 Camco " " 03/31/86 Camco " " 03/30/86 Static & Flow Static Gradient Flowing Gradient Static Gradient GO Camco Camco Camco GO Camco Camco Camco I~ece i veal D~*e We_il Re~:orcs LR2-1 SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO CHEVRON EX~XON To DAL/UNIT/STATE: TEXACO (-.~a rat hon) MOBIL PHILLIPS 3111 "C" STREET A~ICHORAGE. ALASKA (907! 265-0OO0 MAIL POUCH 6-612 ANCHORAGE. ALASKA 99502 Da te: 04/14/86 76993 STATE OF AK BPAE GEOSCIENCES REFERENCE: SOHIO CASED HOLE FINAL LOGS The following material is being submitted herewilh. Please acknowledge receil~t by signing copy of this letter and returning it to lhis office:-- A-32 A-33 B-16 B-27 D-25 D-29 Temp. Survey 04/04/86 #1 Temp./Gas Lift Check 04/06/86 #1 Leak Detection/Spinner 03/29/86 #1 Temp. Survey 04/04/86 #1 Temp. Survey 04/02/86 ~1 Temp. Survey 04/03/86 #1 · t~~O H-24 Temp. Survey , 04/05/86 #1 '-i~..e, ~--~J--' [M:lS[~,,ip'-';~:Survey, .T~. ~.~_ 04/04/86 ~1 ~ ~'J~T-7 T=p. Sure;' 04/05/86 91 ~- ~-~ .~' ~--'-':~ Spinner/C~ 03/30/86 ~1 b. I ~ X-26 Injection Profile/Spinner 03/31/86 D~/~CO/GEOS. O~Y: D-27 CBT 03/23/86 ~1 D-28 CBL/~D 03/27/86 ~1 #1 SURF.-2500 Camco 5" 3400-11300 Camco 5" 8800-10100 Camco 5" Surf. -2500 Camco 5" Surf. -2500 Camco 5" Surf. -3000 Camco 5" Surf. -2500 Camco 5" Surf. -2500 Camco 5" Surf. -2500 Camco 5" Surf. -2500 Camco 5" 10500-11580 Camco 5" Surf. -2500 Camco 5" 9250-9540 Camco 5" R£C[~v[O · ' 19 Victoria Aidridge LR2-1 INFORMATION CONTROL WELL RECORDS LR2-1 SOHIO ALASKA PETROLEUM COMPANY March 31, 1986 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502q3612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton . ._ Wells X-10, X-12, X-19, & X-26 Gentlemen: Enclosed, in duplicate, are Forms 10-403, Sundry Notices and Reports on Wells, for each of the above-named wells. These contain our sub- sequent report of stimulating these wells. Yours very truly, ~upervisor Production Operations JAB: JAM~ Enclosures (8) cc: Drilling Well Files (MB12-1) Well Records (LR2-1) X-10,X-12,X-19,X-26 Well Files STATE OF ALASKA AkASK~A~OIk AND GAS CONSERVATION C~MMIsSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. STANDARD ALASKA PRODUCTION COMPANY 84-30 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 4. Location of Well At surface: 99519-6612 200' NSL, 617' WEL, Sec. 6, T10N, R14E, UPM · 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 75.00' AMSL J ADL 28313 12. 8. APl Number 50-029-21085 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number ×-26 (24-06-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation ~] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operati.ons (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A bullheaded four-stage mud acid stimulation was performed March 24, 1986 on the following perforated interVals in water injection well X-26: 9395' - 9417' BKB 9423' - 9440' BKB 9450' - 9483' BKB 9493' - 9542' BKB Each of the first three Stages consisted of the following: 1500 gal. 15% HC1 3000 gal. '12% HCl - 3% HF 3000 gal. 3% NH4Cl 750 gal. 3% NH4C1 w/750 lbs. benzoic acid flakes The fourth stage consisted of'the fOllowing: 1500 gal. 15% HC1 3000 gal. 12% HCl - 3% HF 3000 gal. 3% NH4C1 1100 gal. methanol ,14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The s~affe belo~ for Commission use J. a. Br~rj~ Condl~ions of Approval, if any: Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY February 6, 1986 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: ~ir. C. V. Chatterton Well X-26 (24-06-10-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB: JAM~ J/. A. Bragg ~uperVisor Production Operations Enclosures (3) cc: Drilling Well File (MB12-1) Well Records (LR2-1) X-26 Well File STATE OF ALASKA ALASKA r.W'L AND GAS CONSERVATION COwrMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER ~ 2. Name of Operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 84-30 3. Address P. O. BOX 196612, Anchorage, Alaska 4. LocationofWell At surface: 99519-6612 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 75.00' AMSL I6. Lease Designation and Serial No. ADL 28313 12. 8. APl Number 50-029-21085 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-26 (24-06-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing I--I Perforations [] Altering Casing [] Stimulate [~ Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A bullheaded four-stage mud acid stimulation is proposed for the following perforated intervals in water injection well X-26. This work is scheduled to commence in Feb. 1986.. 9395' - 9417' BKB 9423' - 9440' BKB 9450' - 9483' BKB 9493' - 9542' BKB three stages will consist of the following: Each of the first 1500 gal. 15% HC1 3000 gal. 12% HC1 - 3% HF 3000 gal. 3% NH4C1 750 gal. 3% NH4Cl w/ 750 lbs. benzoic acid flakes The fourth stage will consist of the following: 1500 gal. 15% HCl 3000 gal. 12% HC1 - 3% HF 3000 gal. 3% NH4C1 700 gal. methanol 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. -"~5~ ~~ ~~ Supvr Production Operations Signed Title · spac/e//elow for Commission use~ ("/ J- A. Bragcj Conditi~s of Approval, if any: Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 900 EAST RENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502~612 October 16, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr~ C~ V' Chatterton Gentlemen' Well X-26 (24-06-10-14) PBU Enclosed in duplicate, are the follouing forms for the above-named well' 1. Form 10-407, Completion Report 2. Form 10-403, Sundry Notice and Reports on Wells 3. Form 10-104, Monthly Report of Drilling and Workovers '18 Very truly yours, Michael D. Martin Senior Petroleum Engineer Enclosure cc' T. N. Tyler Well Records Drilling Well File #17 STATE OF ALASKA ¢ C.- ALASKA~o'TL AND GAS-CONSERVATION CO"~'T'~MISSION ~- WELL COMPLETION OR RECOMPLETION REPORT AND LOG - 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE I~ Water In.iector ~. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 84-30 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21085 4. Location of well at surface 9. Unit or Lease Name 200' NSL, 617' WEt, Sec. 06, TiON, R14E, UPM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 467' NSL, 3029' WEt, Sec. 06, T10N, R14E, UPM X-26 (24-06-10-14) PBU At Total Depth 11. Field and Pool 527' NSL, 3165' WEt, Sec. 06, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay KBE = 75.0' AMSLJ ADL 28313 Prudhoe Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 3-01-84 3-12-84 3-18-84J feet MStI OD_e 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 9770'MD 9254'TVD 9727'MD 9213'TVD YES~ NO[]I 2162 feetMD 2100' 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, CDL/CNS/GR/CAL, SFT, CBL/VDL/GR/CCL, Gyroscopic survey . 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MO CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 2.0 x 30 Insulate~ Conduct<,r Surface 1!0- 36 8cu.¥ds. concretf~ 13-3/8 72~ L-80 Surface 2676 17% 3813 cu.ft.Permafroi;t II 9-5/8 47~ L-SO Surface 9240 12¼ 1650cu.ft.C!ass G w.'8% Gel followed 230cu.ft.Class G; 2]'9cu.ft.Perm~frosl 7. 26# L-80 8982 9770 8~ 320cu.ft.ClassG witt 18% salt. 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) M~) T~V~) SIZE DEPTH SET (MD) PACKER SET (MD) Prudhoe Oil Pool Top: 9395' 8821' 4~" 8934' 8934' Bottom: 9542' 8962' ~ 4-z~'' tailpi)e 9039' 9395 '-9417 ' BKB (8821 ' -8842 ' TVDss) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9423'-9440' BKB (8848'-8864' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9450'-9483' BKB (8874'-8905' TVDss) 9493~-9542' BKB (8915'-8962' TVDss) · : -. 27. PRODUCTION TEST Date.'First Production - - Method of Operation (FIowing,_gas lift, etc.) February 20, 1985 Water injector . Date of Test HoursT'ested PRODUCTION FOR OIL-BDt GAS-MCF WATER-BDt CHOKESIZE IGAS-OILRATIO' TEST PERIOD I~ I FIowTubing Casing Pressure CALCULATED I1~' OIL-DSt GAS-MCF WATER-BDt . OIL GRAVITY-APl (corr) Press. -- 24-HOUR-RATE . . 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED OCT 2 4 Alaska Oil & Gas Cons. Commission Anchora. gs Y C, Form 10407 ~ Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB Subsea Sag R. Sst. 9281' 8713' Shublik 9303 ' 8734 ' Ivishak 9391 ' 8818 ' 31. LIST OF ATTACHMENTS 32. ,\ I hereby certify that the foregoing is true and correct to the best (~f my knowledge Sig TitleSr. Petroleum ]~lq~_IDate I NSTR UCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for dePth measUrements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in-item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALASKA O'lT_ AND GAS CONSERVATION COIV~rMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL r~ OTHER [] 2. Name of Operator SOHIO Alaska Petroleum Company 3. Address P. O, Box 196612' Anchorage, Alaska 4. Location of Well At Surface' 9951 9-661 2 7. Permit No. 84-30 8. APl Number 50- 029-21DS-~ 9. Unit or Lease Name Prt~_dhoe Bay Unit . _ . 200' NSL, 617' WEL, Sec 06, TION~ R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) - KBE = 75~00' AMSL 12. 10. Well Number X-26 (24-06-10-14~PBU 11. Field and Pool I 6. Lease Designation and Serial No. Prudhoe Bay ADL 283!3 Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) ])II] Altering Casing [] [] Abandonment [] [] Other J~ 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following interval was 2-7/8" Hyperdomes at 4 s,p'f, psi on all well work~ perforated August 31~ 1985 using Schlumberger A lubricator was installed and tested to 3000 9493' - 9542' BKB (Ref- BHCS/GR; 3-13-84) On September 21, 1985 th the W.P.W.Z Waterflood perforations at 4 s.p.f, 9395' - 9415' BKB 9423' - 9440' BKB 9450' - 9483' BKB 9493' - 9542' BKB is well was converted into a water injection well for Project Water was injected through the above (Ref. BHCS/GR, 3-13-84) (Ref. BHCS/GR, 3-13-84) (Ref. BHCS/GR' 3-13-84) (Ref. BHCS/GR, 3-13-84) RECEIVED OrsT 2 Alaska 0il & Gas Cons. Commission Anchorage. 14..J[! hereby certify that the forego,ng ,s tru~rect to the best of my knowledge. S ,~~~~~~ Title Senior Petroleum Enqineer Tt~ space below for Commission use Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-?-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate STATE OF ALASKA % ALASKA 0'TI' AND GAS CONSERVATION coM~i~IISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well 5. 2. Name of operator Sohio Alaska Petroleum Company 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 · 4. Location of Well at surface 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM Elevation in feet (indicate KB, DF, etc.) KBE = 75.00' A~SL 6. Lease Designation and Serial No. ADL 28313 Workover operation 7. Permit No. 84-30 8. APl Number 5o- 029-21085 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. X-26 (24-06-10-14) PBU For the Month of September ,19 85 t'12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run RECEi VED 6. DST data, perforating data, shows of H2S, miscellaneous data See Attached. 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Oil & .Gas Cons. Commission AnChorage hereby certify that the foregoing is true and correct to the best of my knowledge. ~~~~ TITLE .S.r. Petroleum Engr, .. DATE , N'OTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed iA duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 [~v 7-1-R0 Submit in duplicate PERFORATING DATA - Well 'X-26 (24-06110-14) PBU August 31, 1985' Rigged up Schlumberger and perforated the following additional interval using 2-7/8" Hyperdomes at 4 s~p~f' 9493' - 9542' BKB (Ref~ BHCS/GR, 3-13-84) September 21, 1985: Well put on water injection, A!as~a Oil & Gas Cons, SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON To~ SFO/UNIT/STATE: TE]CACO (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907l 265-0000 MAIL: POUCH 6-6 ] 2 ANCHORAGE. ALASKA 99502 Date- 07/26/85 T#- 76338 REFERENCE: .- SOHIO CASED HOLR FINAL LOGS ~ ~o ' The following material is being submitted herewit wledge receipt by signing a ' copy of this letter and returning it to this office:-- UNIT/STATE: X-26 Cont. Flow SurVey 6/18/85 #1 9200-9550 GO 5" DAli Alaska 0ii & Gas Cons. c°mmissi°nV±ct°r±a Aldr±dge LR2-1 Technical Documentation Anchorage ~9 Records Management SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 August 22, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr. C.V. Chatterton Wells A-11, A-1 7, U-4, U-5, X-23~ X-24, X-26, and Y-5 PBU Gentlemen- Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above named wells. These contain our proposals to perforate these wells and convert them to seawater injectors for the WPWZ Waterflood Project. Yours very truly, Michael D. Martin Sr. Petroleum Engineer Enclosures cc' T. N. Tyler Well Records (LR2-1) Well File #17 RECEIVED AUG 2 6 ! 85 Alaska OiJ & Gas Cons. Commission Anchorage STATE Of ALASKA ALASKA AND GAS CONSERVATION CO '" ISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELLX] OTHER [] 2. Name of Operator SOHIO Alaska Petroleum Company 3. Address P. O. Box 6612, Anchorage, Alaska 4. Location of Well At Surface' 200' NSL, 617' WEL, Sec. 06, TION, R14E, UPM 99502 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE : 75;0' 12. 7. Permit No. 84-30 8. APl Number 50-02 9-21085 9. Unit or Lease Name P?,Jdhoe Bay ~Jnit 10. Well Number X-26 (24-06-! O-! 4)PB~J 11. Field and Pool Prudhoe Bay Check Appropriate Box To Indicate Nature of Notice, Report, or O~l~e~l~ ~' ' · ~ ' NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other J~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following additional interval will be perforated in August/September, 1985. A lubricator will be installed and tested to 3500 psi on all well work. 9493' - 9542' BKB (Ref. BHCS/GR, 3-13-84) Following perforating, this well will be converted-to a seawater injection well for the WPWZ Waterflood Project. Water will be injected through perforations at' 9395 -- 9415 BKB {Ref. BHCS/GR, 3-13-84) 9423 -- 9440 BKB (Ref. BHCS/GR, 3-13-84) 9450 -- 9483 BKB (Ref. BHCS/GR, 3-13-84) 9493 -- 9542 BKB (Ref. BHCS/GR, 3-13-84)- RECEIVED AUG 2 6 1985 Alaska 0il & Gas Cons. C0mmissi Anchorag~ to the best of my knowledge. Title Senior Petroleum Engineer Conditions of Approval, if any: Approved by ORIGINAL SIGNED BY H~ItRY V~. ~I]GLER Approved Copy Returned By Order of COMMISSIONER the Commission Date <~-C~ ~' On Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY SYO ARCO CttEVR. ON F. XXON ~o: SF0/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS ~T~TETOF-AK :~: BPAE 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T#: 8-09-85 76372 REFERENCE: S~I0 ~SED HOLE FINAL LOGS ~The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: D-6 CFS 7-07-85 9050-9400. GO #1 5" D-7 CFS 6-20-85 11900-12330 GO #1 5" X-7 CFS 7-02-85 10700-11000 GO #1 5" X-26 Temp 6-18-85 9200-9660 GO #1 5" ' ' 6-20-85 9200-9667 #2 RECEIVED DATt' Alaska Oil & Gas Cons. Commissi~thy Perkins Anchorage 19 LR 2-1 Technical Documentahion Records Management INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON To:SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS !.. STATE'~'.' BPAE (Transmittal Only) 3111"C"STREET ANCHORAGE. ALASKA TELEPHONEI9071265-OOOO MAIL:POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T#: 7/19/85 76322 REFERENCE: SO~O FINAL DATA - PRESSURE SURVEY DATA coy fOllowing material is being submitted herewith. Please acknowledge receipt by signing a of this letter and returning it to this office:-- A-3~' Static Gradient B-9 ~- Static Gradient B-13- Static Gradient D-6-/.'PBU & BHPD D-7 f PBU & BtIPD H-8'-~' 'Static x_7~ ~x-~6"~ X-26~ Static Gradient BHPD & Falloff BHPD & Falloff PBU & BHPD Flowing Gradient PBU & BHPD 7/05/85 7/03/85 7/04/85 7/08/85 6/22/85 7/06/85 7/06/85 3/04/85 2/01/85 7/03/85 7/06/85 6/20/85 RECEIVED DATE _~2~zslm r<.,~..~; .... ,;,. ~--~j..~. C;."..; ..... :~'~ctoria Aldridge 19 LR2-1 Technical Documentation Records Management L SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON TO~ SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS STATE BPAE (Transmittal Only) :51 I I "C" STRE£1 ANCHORAGE. ALASKA TELEPHONE (9071 265 0000 MAIL: POUCH 6-6 ] 2 ANCHORAGE. ALASKA 99502 Date: 3/27/85 T#: 7 6080 REFERE~ ' SO~O FINAL DATA - PRESSURE SURVEY DATA ,.. ~he following material is being submitted herewith. Please acknowledge receipt by signing a [-~ copy of this letter and returning it to this office:-- K-1 K-6 X-24 X-26 Static Gradient & BHPD Flowing Gradient & BHPD Static Gradient Static Gradient 3/1-2/85 Camco 3/6-8/85 Camco 2/27/85 Otis 2/28/~5 Otis RECEIVED DATE .~ - .~ . Cathy Perkins LR 2-1 Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON .. EXXON TO: SFO/UNIT/STATE: TEXACO (-Mara then) MOBIL PHILLIPS STATE OF AK BPAE 31 ! ! "C"STREET ANCHORAGE. ALASKA TELEPHONE {907! 265-0000 MAIL: POUCH 6-6 ! 2 ANCHORAGE, ALASKA 99502 Date: T#: 3/13/85 76053 REFERENCE: CASED FINAL LOGS HOLE ng material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- SFO/UNIT/STATE: ,,-K- 3 CFS CFS G R-:Co 11 ar 2/26/85 3/01/85 2/18/85 #1 9550-10000 GO 5" 9465-9474 GO 5" DRES 5" fl[.C[~vfO I}^ I i Cathy Perkins LR2-1 Development Geology SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA '/d,C. TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 March 15, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well X-26 (24-06-10-14) PBU Enclosed, in duplicate, are the following forms for the above,named well, 1. Form 10-407, Completion Report. 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. JAB/~~/jmw Enclosures cc: A. E. Leske Well Records (LR2-1) Drilling Well File #17 Yours very truly, istrict Petroleum Engineer (Act' g) REC[ VED Alaska 0ii & Gas Cons. Commission A~.chomge. STATE OF ALASKA ALASKA%~-L AND GAS CONSERVATION C '-(:~.¢~MISSION ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 84-30 3. Address 8. APl Number P. O. Box 6612, Anchorage, Alaska 99502 50-029-21085 4. Location of well at surface 9. Unit or Lease Name 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 467' NSL, 3029' WEL, Sec. 06, T10N, R14E, UPM X-26 (24-06-10-14) PBU At Total Depth 11. Field and Pool 527' NSL, 3165' WEL, Sec. 06, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay KBE = 75.0' AMSLI ADL 28313 Prudhoe Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore I16. No. of Completions 3-01-84 3-12-84 3-18-84I feet MSLI One 17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 9770'MD 9254'TVD 9727'MD 9213'TVD YES[] NO[] 2162 feetMDI 2100' 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, CDL/CNS/GR/CAL, SFT, CBL/.VDL/GR/CCL, Gyroscopic survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20 x 30 Insulated Conducto] Surface 110 36 8 cu.yds, concrete 13 3/8 72# L-80 Surface 2676 17~ 3813 cu.ft. Permafro.,t II 9 5/8 47# L-80 Surface 9240 12¼ 1650 cu.ft.Class G w'8% Gel followed 230 cu.ft.Class G; 2]'9 cu.ft. Permafrc 7 26# L-80 8982 9770 8~ 320 cu ft. Class G w:.th 18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) ~) TVDss SIZE DEPTH SET (MD) PACKER SET (MD) ~., Prudhoe Oil Pool Top: 9395' 8821' 4~" 8934' 8934' Bottom: 9483' 8905' w 42" ,_ tailpi)e 9039' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9395'-9417 ' BKB (8821 '-8842' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9423'-9440' BKB (8848'-8864' TVDss) 9450'-9483' BKB (8874'-8905' TVDss) 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) February 20, 1985I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD I~ ' Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None RECEIVED :MAR l 9 1985 Alaska 0il & Gas Cons. Commission Anchora, ge Y tC Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB SUBSEA Sag R. Sst. 9281' 8713' Shublik 9303 ' 8734 ' Iv±shak 9391 ' i~ 8818' 1 ! II , i 31~:~.~.ST];~OF ATTACHMENTS 32. !l' I hereby certify that the foregoing is True and correct to the best of my knowledge · Signed Bragg' Title Petroleum EngineerDate INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form i 0-407 STATE OF ALASKA ,-..~ ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 84-30 3. Address 8. APl Number P. O. Box 6612, Anchorage, Alaska 99502 50-029-21085 4. Location of Well OTHER [] At Surface: 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 75.00' AMSL 6. Lease Designation and Serial No. ADL 28313 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-26 (24-06-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals were perforated February 20, 1985 using Dresser Atlas 3 1/8" Carriers at 4 s.p.f. ~ A lubricator was installed and tested to 3000 psi on all well work. "9395'-9417' BKB (Ref. BHCS/GR, 3/13/84) 9423'-9440' BKB ( " ) 9450'-9483' BKB ( " ) An SSSV was set and tested in the ball valve nipple at 2162'. 1\.4~1 hereby certify that the for going is true and correct to the best of my knowledge. ~ ~ Acting District igned Title Petroleum Engineer fhe spac,~below ,or L;om_m,ss,on use vv Conditij~s of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Submit "Intentions" in Triplicate Form 10-403 Rev. 7-1-80 and "Subsequent Reports" in Duplicate ,, STATE OF ALASKA ~ ~ ALASKAi,,~,LAND GAS CONSERVATION CL~.~'MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS Y-''''' · Drilling well .~. Workover operation [] 2. Name of operator 7. Permit No. Sohio Alaska Petroleum Company 84-30 3. Address 8. APl Number P. O. Box 6612, Anchorage, Alaska 99502 50-029-21085 4. Location of Well at surface 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 75.00' AMSL ADL 28313 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. X-26 (24-06-10-14) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool For the Month of. March ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run 6. DST data, perforating data, shows of H2S, miscellaneous data RECEIVED See Attached. AlaSka Oil & Gas Cons, Commission Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Acting District ~ ~ TITLE Petroleum Engineer DATE )rt on this form is require~/~,~r each calendar month, regardless of the Status of operations, and must be f/led in duplicate with the Alaska Conservation Commission by the 15th of the succeeding month, unless otherwise directed. GNE !!lrTamnEi- a~4~ Submit in duplicate PERFORATING DATA - WELL X-26 (24-06-10-14) PBU February 13, 1985: Pressure tested tubing and inner annulus. February 18-20, 1985: Rigged up Dresser Atlas and perforated the following intervals using 3 1/8" Carrier guns at 4 spf: 9395'-9417' BKB (Ref. BHCS/GR, 3/13/84) 9423'-9440' BKB ( " ) 9450'-9483' BKB ( " ) Put well on production. February 26, 1985: Shut well in to prepare for static pressure survey. February 28, 1985: Ran static pressure/temperature survey at 8800' TVDss. March 4, 1985: Set and tested SSSV in ball valve nipple at 2162'. Well on production. RECEIVED Alaska Oil & Gas Cons. Commission Anchora.c...,e SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 January 29, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells X-24 and X~26 Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells~ for the above-named wells. These contain our proposals to perforate these wells. JAB / J~/pw Enclosures cc' A. E. Leske Well Records Well File #17 Yours very truly, s A. Bragg istrict Petroleum Engineer RECEIVED F E B 0 4 1985 Alaska 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA ~_._AND GAS CONSERVATION CC. vllSSlON SUNDRY NOTICES AND REPORTS -ON WELLS 1. DRILLING WELL[] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 84-.30 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029--21085 4. Location of Well At Surface: 200' NSL, 617' WEL, Sec. 5. Elevation in feet (indicate KB, DF, etc.) KBE = 75.00' AMSL 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-26 (24-06.-10-14) PBU 06, T10N, R14E, UPM 6. Lease Designation and Serial No. ADL 28313 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate i~] Alter Casing [] Perforations Stim u late [] Abandon ~ Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other [] [] [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated in February, 1985 using 3 3/8" scallop guns at 6 spf. A lubricator will be installed and tested to 3500 psi for all well work. 9395'-9415~ BKB (Ref. BHCS/GR, 3/13/84) 9423'-9440' BKB ( " ) 9450'-9483' BKB ( " ) An SSSV will be set and tested in the ball valve nipple at 2162~, RECEIVED 0 4 ]985 Alaska Oil & Gas Cons, Commissic Anchorage ~or Commission use Con~//~ns of Approval, if any: Approved by hereby certify that the foregoing is true and correct to the best of my knowledge. Title District Petroleum Engineer Date COMMISSIONER By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate INDF, X~D SOHIO ALASKA PETROLEUM COMPANY SFO ARCO EXXON TO: PHILLIPS STATE OF AK CENTRAL FILES (CC#' s-Transmittal Only 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE ;907) 265-0000 MAIL: POUCH 6-6i 2 ANCHORAGE, ALASKA 99502 Date: 6-27-84 CC#: 75452 REFERENCE: SOHIO MAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:- OPEN HOLE LOGS: ! X-26 ~ SFT w/ Listing 6-26-84 CASED HOLE LOGS: Tape Pos # GO #396 11338-01 03023 · E-4 / CH/CNS W/ Listing 6-25-84 GO ~ J-8~ CH/CNS w/ Listing 6-26-84 GO · M-2~/ CH/CNS, w/ Listing 6-26'84 GO -N-6~ CH/CNS w/ Listing 6-26-84 GO · N-87 CH/CNS w/ Listing 6-27-84 GO ' a-4/ CH/CNS w/ Listing 6-28-84 GO · C-8~/ "CH/CNS w/ Listing 6-27-84 GO · E-2u/ CH/CNS w/ Listing 6-28-84 GO . H_7w~ CH/CNS w/ Listing 6-28-84 GO · J-~ CH/CNS w/ Listing 6-27-84 GO JTN#281832 03025 JTN#281834 03024 JTN#281836 03028 JTN#281833 03027 JTN#281835 03026 JTN#281838 03033 JTN#281838 03029 JTN#281840 03031 JTN#281841 03032 JTN#281839 03030 glib- o- I ;387- received the Tape(s) and Listing(~~l~~ the respective se~ice c~pany. Please confi~ this~ / ~ 7-7~' ---- m~cmv~m ~ ~3, ~ ....... C~olvn Bishop -' /. /O U k O ~ ~ DevelOpment Geology q-~'~ , / ,- Well Records ' DATE / ~ O/ AlasKa 01i & Gas Cons.'Co~sion ( 4 / 8 ~ Anchorage INDEXED SOHIO ALASKA PETROLEUM COMPANY S¥0 ARCO CHF. VRON EXXON ~o: SFO/UNIT/ GETTY STATE: MARATHON MOBIL PHILLIPS ~* STATE OF AK BPAE (Transmittal Only) 3111"C"STREET ANCHORAGE, ALASKA TELEPHONE{907) 265-O000 MAIL:POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: CC#: 75382 * Date to State -~.-. Via Drilling: ~ '~' .EFERENc~.ENTRAL FILES(CC#'s-Transmittal Only) DEN IAL ' ~, I '-~ HIO, OPEN HOLE ,FINAL LOGS STATE OF ~,~,ASK. C.0Pt / The following material is being submitted herewith. Please acknowledge receipt by signing a L/' copy of this letter and returning it to this office:-- SFO/UNIT/STATE: -{, · X-26 CDL 3-13-84 #1 9239-9760 GO 5" JUN 1 8 198,~'~-~ Alaska 0ii & Gas Cons, Commission Anchorage STATE ONLY: DIRECTIONAL SURVEYS: Magnetic Single Shot Directional Survey Gyroscopic Directional Survey Date: Job#: Date: Job#: RECEIVED DATE 19 Carolyn Bishop Development Geology Well Records GEARHART INDUSTRIES, INC. June 13, 1984 To Whom It May Concern' RECEIVED JUN ] 8 ]984 Alaska O# &A~as Oons, Oornrnission '-Chore?.¢~e The enclosed copies of the Compensated Density Log for Well X-26, run on 3-13-84, are being redistributed as the main and repeat sections were reversed in the field. This log is now corrected and will match the L.I.S. tapes that have been distributed. The field prints have not been changed and, therefore, the main and repeat sections are in the reverse order as compared to the L.I.S. tapes and the redistributed finals. David W. Douglas Computing Center Gearhart.Industries Inc. DWD/sjt Post Office Box 102436 Anchorage, Alaska 99510 Telephone 907-562-2538 SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 April 12, 1984 Alaska Oil & Gas Conservation Conmtission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: W~'.T. X-26 (24'06'10'14) PBU Enclosed, in dupliCate, is Fo~m 10-407, Well Cc~pletion Report, for the above-named well together with the Well History and Directional SurveyS. Well logs had been submitted to you previously under separate cover. This well has been completed as a non-perforated oil well. Very truly yours, ~District Drilling Engineer . encs CC: Well File #17 Geology ' ' STATE OF ALASKA ALASK~.~IL AN D GAS CONSERVATION ~'~MISSIO0 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 84-30 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50J]29-21085 4. Location of well at surface 1 L"~'~--~]©~$~ 9. Unit or Lease Name 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM i~~vEmFiED, I Prudhoe Bay Unit At Top Producing Interval Top of Sag. R. Sst. Sur~.----~ 10. Well Number X-26 (24-06-10-14) PBU 467' NSL, 3029' WEL, Sec. 06, T10N, R14E, UPM At Total Depth ~3~/ 11. Field and Pool 527' NSL, ~L, Sec. 06, T10N, R14E, UPM Prudhoe Bay 5. Elevation[~3E. =in feet75.0,(indicateAMsnKB, DF, etc.) I 6. Lease ADADesignation28313and Serial No. P:L'~C~Oe Oil Pool 12. Date Spudded3_01_84 13. Date T.D. Reached3_12_84 14' Date C°mp" SuMp' °r Aband' J 15' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns3--18--84. feet MSL One 17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 9770 'MD - 9254'T~) 9727 'MD- 9213'T~ )YES [] NO []I 2162 feet MD 2100 ' 22. Type Electric or Other Logs Run DIL/BHCS/SP/GR, : CDL/CNS/GR/CAL, SFT, CBL/VDL/GR/CCL, G~yroscopic survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 20x30 Insulate! Conduc~)r Surfac_= 110 36 8 cu.yds, concrete 13 3/8 72~ L-80 Surface 2676 17½ 3813 cu.fto Peri, afro: ;t II 9 5/8 479 L-80 Surface 9240 12¼ 1650 cu.ft.Class G w,/8% Gel followed 230 cu.ft.Class G;27!) cu.ft.Permafrost 7 26# L-80 8982 9770 8% 320 cu.ft.Class G wi-~ 18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4½" 8934 ' 8934 ' W 4½" tailpi pe 9039 ' 'None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED~1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. con E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Alaska 0il & Gas Cons. ' WELL COMPLETION OR RECOMPLETION REPORT AND LOG C Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Sag R. Sst. Shublik Ivishak GEOLOGIC MARKERS MEAS. DEPTH BKB 9281' 9303' 9391' TRUE VERT. DEPTH 8713' 8734' 8818' 30. FORMATION TEsTs Include interval tested, )ressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. Well History and Directional Surveys I hereby certify that the foregoing is true and correct to the best of my knowledge  District Drilling Engineer Signed__ Title Date R~ H. R~]~y INSTRUCTIONS (Logs previously sent under separate Dover) General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If.this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic pUmp, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 WELL X-26 (24-06-10-14) WELL HISTORY Spudded well at 0030 hours March 1, 1984. Vertically drilled 17½" hole to 2700'. Ran 66 jts. 13 3/8" 72# L-80 Buttress casing to 2676'. Ceman~ with 3813 cu. ft. Permafrost II c~T~nt. Installed and tested BOPE. Cleaned out to 2630', tested casing to 3000 psi, okay. Drilled out to 2730' , ran leak-off test to 0.68 psi/ft, gradient. Directionally drilled 12¼" hole to 9253'. Ran 228 jts. 9 5/8" 479 L-80 Buttress casing to 9240'. Cemented with lead slurry of 1650 cu. ft. Class G cement with 8% Gel followed by tail slurry of 230 cu. ft. Class G neat. Tested casing to 3000 psi, okay. Cleaned out float equi~_nt and directionally drilled 8½" hole to 9770'. Ran cgen hole logs. Dc~n-squeezed 175 bbl 9.3 ppg. NaCl, then 279 cu. ft. Permafrost C cement followed by Arctic Pack. Ran 19 jts. 7" 26# L-80 IJ4S liner to 9770'. Cemented with 320 cu. ft. Class G ~t with 18% salt. Cleaned out to 8982', tested liner to 3000 psi, okay. Cleaned out to 9727', tested liner to 3000 psi, okay. Changed well over to NaC1. Tested ] ~ner to 3000 psi, okay. Ran C~L. Ran 214 jts. 4½" 12.6# L-80 A/B Mod Buttress IPC tubing with 4½" tailpipe assembly to 9039'. Landed tubing with ball valve at 2162'. Installed and tested tree. Displaced tubing to diesel, set packer at 8934'. Tested tubing to 3500 psi, okay. Released rig at 0600 hours March 18, 1984. Ran gyroscopic survey, tested and secured well March 24, 1984. APR 1 2 984 Alaska Oil & Gas Oons. Commission A~chorage SOHIO ALASKA PETROLEUM CO. PAD-X (24.06. I0-~4) X'26 Controlled LES HENDERSON 349-3114 Drilling Consultants CONTR LED_oRILLINGCON OLTANTs; INC. .' ' 'RE: Magnetic Single Shot'.Survey JOb No. ~0'384-001 " - Well ' '!X~26 (2'4-06-101'14) . Prudhoe.. Bay Field "North. SloPe, Alaska - . Date Of Survey-' 03-0i-84 to 03-11-84 . .. Dear Mr o Rose -' ' .. : Please find enclosed the "Original" and: Six (6) copies of our ' Magnetic Single Shot .SUrvey on the above ;well. .The method used in calculating this survey was-Radius _0f:~Curvature.~ The depth of the survey was 2676 ¢o 9253' ' "= -- Thank' you for giving us: this °pportuni~Y';to be of-service. . _ . . Yours very truly, · - : --Controiied-'Drilling Consul nts, Inc. - 'Terry -V. Henderson Directional Supervisor - .~. - . - .. : . . · .. .. ·_ - _ . - - -_. _-_ ,. ........... :jO . . - - . _ _ . '. ~ - : . :: . ._ Mr. Brian Rose . Sohio Alaska Petroleum 'Company ' . - · : Pouch '6-612 . . · . Anchorage, AK 99502. ' .'. -. : _. -. March 16 .. - ~ . . -: ]HIO HLH~KA PETROLEUN ,~3NETIC SINGLE SHO'T SURVEY ¢IDIUS OF' CURVATURE METHOD OF' COi'dPUTAT]ON NGINEER TERRY HENDERSON DHPUTED FOR CDC BY OCEANTECN<FH L.~{NLtSEY r.~u A-- i.dELL. X-26 H::B ELEV 75,00 FT, SURVEY DRTE F ROPOSED RE .P. OP, D OF $ U R './E Y TRUE EPTH AN6LE OEPTH S E A C, ;I: R E C: 'l" OTAL -.,, ~ur~..~., I NATES C L 0 S U R E :'S DISTANCE ANL~LE :$SUM£O VERTICRL, TO ,26.76 FT., oo W 3.69 ti 38,42 W 55,i? kI 7'5.57 W 99,i4 W 4il 8i ki 82'6 92 Y I814,16 W 846 3~ .W ii .96 24,40 55,19 75.57 99.28 t27,59 i60,~2 ~96.76 527.7 i 021, ~9 !220.07 4;~4. G2 978.1 'B 1 ..~.2. I SEVER I T'Y SEC1 1 ON tsP. L~,.., I 0 OFT [:' I STAWC JOB NO ~-0S84-001 KB ELEY 7'5, O0 RECORD OF' .SUF;YEY ........................ TRUE EAS, DRIFT YERTICAL ..E_..P TH___.A.N G_~. ........ DEP TH D H SUB DR IFT SEA D Z RE ~'": TOTAL COORDINATES CLOSURES D I STANCE ANGLE D H . . ,.. =.-,' .... I TY SEC T I ON '"/ I..,TANCE DE~, i 80FT 5 ~ 919,3 18 .3{3 ~'-"n , ,. . ".'..~, . 22~,R 2:6 N 8': .. ,~...~93.1~-~,., N 81 50 38 W HE FOLLOWING I'S EXTRAPOLATED TO TD 9,,=.53 18 3 ~ ,~,' 5~, 4~ 8,683,45 N65.0 Oi.(I 2411 ,41 N 8i "'I' OTTOI~t HOLE CLOSURE 241! ,41 FEET EClSURED DEPTH AND OTHER DRTR FOR EVERY E~?EN' '~O0 FEET' OF SUB SEA DE:PT'H, COMPU T¢:R, ,.., -, ~ ,,,.';' H,qR Kb ELEY 75,00 FT, ........................................ 'rRU . ~ -~ ¥ HER~UREC ERT ICAL. SUE, ......... DE_P_TH.'._ DEP TH SEA i't [3 - T V.9 V E R T I C A L '" ZF'FE~ENCE CORRE',CT _! nb: TOTAL COORDINATES ................... 2Z7~ ....................... 2775, 2875 2875, ................. :2~76 ............. 2975. ........................ ~..;L8_._5 ~75.. 2700 2800 2900 3000 7100 ?""' 00 ,~300 .................................. ..................... ~,_,;_0.~_ ............... ,,..~_ 75, .......................~l'Z,_8,. 37~57 , ............... .~.~g_.~ 3 ~ s, .................................. ~=,~ ~...~) Z975, ...................... ~2 ................................. ~.07 ..................... ~_~ ....................... ~.7_5.., ................ ~_~_4..:~$.. ................... ~_5~ ~ 475 .. 48 i6 4675, .............................. .~..~Z 3475, 3,400 3500 3600' 3700 3,800 3900 40'00 4100 4,200 4300 44.0.0 4~OO 47 O ',} 0 0 o 0 0 0 G i' '= 6 .~ 33 ~ 0 43 54 64 10 87 i 09 1 i t3i ii i4i iO i 7 0 9 i 8 0 ~ O 209 I 0 2'¢9 240 i ~ ',,. .00 S i,l? S 2,i9 S 2,67 S 1.64 S ,4~ N 7,76 N 8.84 N I3.28 N i7.94 N 22.8~ N 27.76 N 32.76 N 43,08 N 48, ~4 N 53,84 N 59,50 H 65,35 N 7i .62 N 85,42 N 92,9J N t00,32 N i 07,24 N 125,3i N ISi,O? N t36,77 N t~2,60 N 140.3t N 153,31 N 157,52 N .OO 7. '!4 i9,22 34,6;2 52 46 74 92 i8~ 95 i3477 i 75 05 ~.~ 22O 4~ ~,~ ,36i ,48 409,67 458,05 554,03 6Oi, 63 74 O. 83 iU ( 7S5,45 87 iii 54 1338.:~0 96 'i tO07 053 099 193 i24i 289 IOHIO W~LL OTHER EVERY E""'wN lO0 FEET O~ SU~ SEA DEPTH C ;3 H P UTE" K8 ,ELEV TRUE ~ ~'' " ~UB !~D'-~'''~r~ ..... HE~U~,.ED ~ERTICAL '~ ' ....... D~FFERE VERT I CORRECTION TOTAL COORDINATES ........... ..5_8.~ ........... 6275 ........... 6_693 .......... 6375. ............. 6.8_0_4 ...... ~ 47'5, 702~ 6675, .................. F_2.~? ................................. (5.875, 7355 6975, .................. ?_~_.6_,5_'. ..................... 707'5. 757.3 7 ~ 75, ......................... ~.8~.~_ ...................... .......... 8 ~.:~U_ ........................... 757.'~., ............................ ~..!_0_~ .................... 7675, ............. .~_3U~ ..................... 7e75, ................. ~4~ ......................... 7 ~.~ 5, ................. 8.~3J. ............................... e 07~, ............................... ~Z.~.~ ................... 827_5, .................. ¢~.~ ........................... s 375, ................ ~;~_~.¢_ .................. 847~, ................... ~_0_5_~ ...... ~575, ......................... ~_.~_.6~ ........................... e~7~, 9~ 8758 61 O0 295 6.200 3 ~300 3i 650 0 .14,4 0 6600 .~1 6780 6800 6900 7000 71 O0 397 7200 405 73 O O 4 ~ ;:2 7400 4~ 9 7500 76 O 0 7700 4 ;i~ 8 ,' ,:,OO 44 79 O 0 45 8 't 0 0 4~51. 8200 4,67 - 8.~ O ~ 47 8400 47 8683 49 4 2 f i 9 9 S' 7' ,, 6 .rS ,S 6 6 160..'9.4 16J. ~S7 i 69.79 i77,34 !Si ,57 186,08 ~90.6I i95,37 205.37 2~0,74 216, ~8 222,45 229,26 23.6, ~3 o 245.05 25.3,96 &~63,54 27;~, 85 284', 87 296.6 0 309.02 322,09 347,5~ '! 386,8 ! 1435,4'7 i 58 0.09 ~ 527.76 ~674,68 f 72 O, 04 1886.44 i 924,75 !961,90 1998. 08 2033,5:5 2 i 02.3 4 2135.69 220! . ~E. 2, ......... 22~4.24 ;226.6,61 ,, t2 75, O0 FT, ,kITERPOLATED VALUES FOR EVEN 'TRUE ......... MEAS-U-~ED ............ VERTICAL DEPTH DEPTH 3000 4000 3939, 5000 4842, 6000 5751, ............................................ ?000 ~I. 8000 7~74. ......................... ~_.0.0. o i. JOB NO A-O.S~'4-OOI 1000 iZEET bf-' i"!EASURE£.~ DEPTH. · :3" L}FS S EI::~ T<?., 7'AL C:OORD i' NA TiES -'?5, , cO 2924, Z, i4 :.'_'; 4767, 33,03 S576, 't'FG.38 H 1~i6,55 W 7499, 222,40 N ~997,80 868~, 3;4'7, SE, N 2386,23 L,.~ C 0 H P IL.,' T E R - i 2 i"i A R K~; ELE9 75,00 F'T. CONFIDENTIAL ATE ALASKA April 4, 1984 Mr. Gary Plisga Sohio Alaska Petroleum Company Pouch 6- 612 Anchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job No. AK-BO-40015 Well: X-26 (SEC 6 T10N R14E) PrudhoeBay. North Slope, Alaska Survey Date: March 23, 1984 Operator: Smith Mr. Plisga: Please find enclosed the "Original" and siXteen (16) copies of our Boss Gyr. oscopic Multisho% Directional Survey on the above well Thank you for giving us this opportunity to be of service.. 3m/~ Enclosures Sincerely, NL SPERRY-SUN, INC. Kirk Afflerbach Dis%rict Supervisor APR i 2 ,. .i SPERRY-SLIN WELL SLIRVEVING COMPANY .. PAGE 1 ANCHORAGE ALA~=;KA ...:. . · ' SOH.IO .ALASKA E'ETROLEUM_CO ........................................................... . ' - - '" ' ................................. DALE-Ld~--.;=,UR YE Y.., MARCH-2L%-i19-84 X-26 (SEC: 6 T10N R14. E) COMPLITATION DA]-E BOSS GYROSCOPIC SURVEY I='RLIBPI'OE BAY MARCH 26, 19:=:4 ,..lOB NUMBER AK-BO-40015 ....... ALASKA ............ . ............................................................. ,: ................. , I<ELLY.,,.BLISH ' OF'ERATOR',J. SMITH VERTICAL SECTION CALCULATED ALONG.CLOSURE . ...: .. TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL MEASLIRED VERT I RAL VERT I CAL I NCL I NAT I ON D I RECT I ON SEVER I TY RECTAN~3LILAR E:OORD INA TER VERT I ......... DEPTH .......... DEF'TH .............................. DEP.TH ............... .............. DEG ...... MIN ..... DEGREES DEG/.iO0 .......... NORT~H/SOUT. H 0 0.00 -75.00 0 0 N 0'. 0 .... :L.O0 .................... lO 0,,.00 ................. 25,_0 O_ ............................. 0 .......... a 5 ....................... N...42 .... 10 ~. 20£} 199. '=?'.-? 124.99 0 46 N 62.69 300 299.98 224.98 0 26 N 48.89 500 4~'~9.96 424.96 0 5!, N 57. :::0 600 ... ~ :,. ="~' ' =~, ='-'~,,~4.95 O' 49 N 69 .39. E O. W ..................... O. W 0. W 0. W .............. 0, W 0, W 0, N_77. ?;0 W ....................... 0 ....... 1 ,' ................................... ,.L....' :~ . I',1 78 30 1,4. 0 .... ' _ · . L) ,='~ Zl'. N ~'] ?"] O,'q. · _7 50 W 0 .... ":' w ~ -". 1,.i .. · N ........................... 7 .L 27 _ W ....................................... 7...,.7 & ........ 1'4 :::. 60 W ".::', 1 :L N 9.7:::: W 10. :'-': 4 1500 14· '--,'".-,'..... ,_,.~c,.. 1424 . ,:,'"'::'.-. 0 1,=,'" Iq .......................... 1.6.00 ................. i 5..'.,~ ,':-?~.,,,..8'i~ ..................... 1.524..,.,..8.~L._ ............... =--.0 ................... 3 N " ' ,2 · ,.',," :" ' · . .':, ,-,C. ~.' 1700 : ,1.6,.~'9,,.,?. .I./.:',~4-,,:,.~..:::0 1.., hi ~ _0' ¢1~. ""'" , ' "C,'": ' · ,() , I "'z. '' -I """;':" : 1 ,=.. O. 17 .,., ,' c .~ 17.z: -1,. ,=, .. :... :~. :.' 0 1 .:,I',1 .... ti, '" ~,~C,,: ,--,,:,, · ,-,.-, ',,~,,-: : ::':: ' - ..1 OO,..: ............. .1.o ........ .,.~...~_ ........ --...~1.,=,~.4.,..,~ ~.:=,:=.;:i~--,,:,(J .................. Zl ........ ..... N ~. 0 L) 0 1 '-"> c~ 9 :_:: 9 i c, .=,,a ,-,,:~ 0 7 N ,. ,. , , - . ...C.~, · .-' 100 2099 '-"- ,:, .-/ :20 ~ 4. '"" , o Y 0 1 :.:.:; 22 o('} '-, ', ¢~,--, ,-,,=,, '-:, '=, F.,,:,, ' ' _,.._ .L= ',-, ,-,= ~,1..~4 ..... ,.. ......... .......... ~.) .......... 7.. N ,.,,.,..,.~,~,.,,, ,., ...... ,., ,,.. ...... ,,, ~ ,~ .,, ,,,, . .,,., ,~ .?.~ .......... . ........ .. :: .:..,::. .... c, :. .,:..,:..'" ~ .... ,, 0 ]. 8 "" . , .-,d lie L'3. ~..1.' 24. 00 239'=.,' '-"=,' .... :"="=' '"'=" 0 '":"":' '":' ''-"'' ,=,; .,:..._,.,=. 4 ,=, .', ~..:, N . 8 () E 0, 1 ":' ..~,:,00""=' ~ "~'~':"-',' '"':'.' ::::'42z1..,,..89...ii ................. i_...._0 ....... 2Zl. N 4. ~ .,.- .~. /.: .'..'.'..-,0 F:' 0.1 4. . ........... :~: ."~...~'.;..,,-.0.;,..... ...... 26 (-)(] '-' =''-''=' '="=' ":'.'=;'=',~ '-"-' 0 26 lq :3,.1.. 69 1:7. 0 07 . . .,'...! ::~ ./ · ,., ,., ., ._ ~:.... ,_', ,_--, 27o0 .... 2/--,';,":,'.:=,'"-',=, 2,".-,24. .8R 0 .,-"=',_,'=' N ..:,'""'-',=,. 6'..-? E 0 . ()5 '"' "" '- .... ' "' J,,..,I '-' 2F:OP 27'=~'-:',' 86 ~7z. 4.,. ,.=,/.: ....... . ,:.~ ........... ~ :L '-' .~ : 72 1'::' ..":' .... , · · . :, · ......... ,.,~;. ";':::!=;o :..-":.-]:4'.'.:,' '77 ::2774. 7.:7 4. '-"'--- ' .... =' . ......... .,...., ::, 7._,, 0 W ' 4,4:::: · . ' L 1 (:). 81 ,' N i :3.24 W :[ 4 · 5; i i1.:33 N i2,95 W ' 14.28 11' i,:,i:.:91,.:,~ lq ........... : ............ ...... i 2 "~.57,,, W i :3,,.,9':2 ....... 1.=` 49 N 12 li W 1'=' 60 · ' . . 1:3.1 :E: N 1 1 .6:3 W 1 ..:,'" · 91 '-' c;,7..N i:3.2:[ N ~ 4.7 12,08 iq :L 5, 9'::', W :L 7, :3':.-, .... -, ,"'~ '"'1' -v -'r , ." ' PAGE ":' :..-,.FERRY-u, LN WELl_ .=,LRVE, ING t. JMFANY. . ... ANCHr]RAGE ALAF;KA · . :: . .'. ......... ouH IU.._ ALA~.,I<A....F ETRL LELIM....CJ ................................................................ ~ .......................... DA]E_,..UF_~L RVEY_..M~RL;H,..~,~.,. .... 1.,, ~.4 .................... - '-"-' .:, JRVEY X - 2/:, ( :--; E C 6 T 1 0 N IR .1. 4 E ) F: 0 I"tF' I_1T A T I i-~ I',1 D A T E B U ;:,,:, G Y R 0 F; F: FI F' I C '-'1 -' F'RLIT~'OE BAY MAR..H'P z./:,,'-' 1':.-",_::4- ,.lOB NLIMBER AI<-BO-4001= _ ALASI<A ................................................................ .......................................... I<ELLY__BUSHI. NG - -' ~ '" - ........ , , ~,~,..,,¢,, ~ .~ . , · . .. , , , " .": UFERATJR-J, SMITH :.. ·. VERTIF:AL SECTION CALC:LILATED ALONG F:LOSURE ' :' '" ,. ...................................................................................................................................................................................... z ............. ~ ............. ,.L.~-~.~.-- ................... ~ ]'RUF' SLIB-:-':EA E:OURSE F:OIJR?:;E DAG-LEG TATAL i ~-. i--. i " .'"" MEASUREf'~ VERT I C:~L VERT Z _.AL I NC:L T NAT I ON D I REF:'I' I tin .=,EVER Z"FY RECTANGULAR C:001:;~D INA FEc, VERT ! C~L- DEF'TH ............... DEP'I'H ............ DEP.TH ............... DEG.. M I N DEGREES ....... DEG/100 ..... IxlOR.TH./'.F.;C.!U.T.H ...... E~?.;Z/~E~,;J]' ......... SECT I AN ,. 2?.00 2899.., ._,='('.) .~'-':'A'-':'z~,. _..- ....... 50 "" 7 ' 1=._, .=,'" 87 · A'..-.¢ W 6, :.,~.~'"'":' 11 46'."N" ": ~.-: .... 1.0 i W ':..;2, 2:'7'. ................. 2~0 .............. k.. ,,'.., P='. ,. ............... .,."""q-'"../ .... ,_,,..,.'"'= ....................... ' '" 6, tq ...:::".4'. ~ 9 W ..................... ..::J.:..,.,~Z ................................ i Z ...... [~L..N~ ............. ,,::..z ..... .<:?; ....... ~ .......................... .,~,, ...... ;.] · ,:,~. :[ 1 .... , ..... 30 C) (') .":, c, ,:, ,:, =;-':, .":, ,.;, .':,.:, = .'", .... ~ ....... . ..... .....~. ..... · ,,:, ::: 4'Y N ,:,'-',=,'-'. :30 N 0 '-' ') . '=;':" N :'44 91 W :36 (')9 3100 3097,26 :'::('~22 26 9 4:2: Iq '-"-' ,=,,:,. I'-.? W 1 24 .1.2 04 N 50.7:--: W P;1 ':'~ ........................ ,,:,,4,..)(.) ..¢.,1 .'::"'"5r"..44 .................. ;312 0. '.4. .4 ................... i2 ............. 2 .......... N 8:3.8()....14 .... 2, 4~: 1:3, 4::: N /-,'-.-,,. ~5 W 7,n,~/-,'::'~ q'-' .... ~ ":' ':, '":' 7 0":' '-':' .1. 7.7 0 4 4 8 '"" '-' '-' ' '" ,. ,.:,u 0 ...~ ..... ._,~. 1 . N ,:,,:, · :':: 0 H ,:: ..7 7 :1. 6. C) 5 N. ..... .. :i .;". . ':;'. 2, 6 1 H '::'., ,..,":' · 9 0 z.. 6 o 1 ,-7, · '=; ~::- ~'" ."::' '.': ':": 34 (') (') '~' '-' '-' ":' ":' ':' ~ ~ . . ,:,..:,o,:,,75 .... -' Iq ,.:,3 W '-'''-' ...... , ~. ~., · 7,..,. 17 ':'": .... ' ¢ ,_,-.,:: ...... ,_,.~. , ~-~ ': ..... 120 · 1 . 14 Z 21., 7 () . '" = =' '~' '= '-' ':) ".' ":' 48 86.6 (:)' =" 2 !5 (..") 4'-' ,:,,.,,., 0 ,:,._, ..,.- :. '7 '7 :34 !='; 4 77 N N 63 · ., 11 N 17C) 84 14 1'72 · ,:,L14 2 26 07 N 4!5 :3600 'R =-' 5 65 "'.=; ')' i ':~ 0 68 W .1. .:,._ L U 6.5 24 1 I',1 87 · '-' ') '~'.';'. '-.?'2 · -, ~ ' .-,z .-, '~ ~ '-' ':'F';-4 z "'.':, ".,=' Z' " .... ' ....... ' "" ~ '" '-' ',6. ~) .-,,--, ,.- - - ~. ~ .,.,. ~,-, N .... :-, 7. ..... 0 W .................. 2, ~ 1 ........................... ~ 7_....1.1_N ..................... z.i.,1,.,..4.:.:, ................. ,,:..~ ,.:,.., ~ 6 3700 '~ 27 '~v ':":": '" -" "- .-':,= "':> .... ~ ~..,. .... 1 N :.. ,.. 66/:,, 35S/1. · ~._ . .. .~...,,~- .. N ;::/-,..., 60 W ]. '='Y:' ":":' · '":' ,:..,~,~.-:.,,., ~, ,~,.oo.,.,.. ~'.~ ,..":,-':,,~l..., ., ._S':>.. 3800 37.=.;6.10 "'A°' '" '"'" ' '"' ' ~ ' q ' 89 ' ' = .... " '-' ...... ~ ~ :"- '"::" '-'" ....' · .:, _ o ~.. :~ ,., .... ..'- o. b: N ,.. 6. W '~ 0.._, 1 o (.). ,=,0 N. ':' .~ 76.7..., W.... .~ 7 o. 4..~:. '-"-."l'" .-,,~, ~ ,- .... , ' " ' ,~:::..":. :.. ,'?/. .',":, "., . . "":' ":,C," CZ'% ":'. . .':, "1, .'t., ¢.' ....................... ", .: ) ) -.-, . ,-,~ ~'", ....... ~, g .~. ................... .4.u.,..7 ..................... ,.:,7..ZO.~7:.-L..~.,,:=..~....,:,~..,:~ ......... 1.! ............... N ,:,6.,/.,o W .............. ~ ......... 0., _1..4. ........................ ,: ...... .~7:...~.L ............. .,.:,ZO ......... -~_W:,- ............. ,...~,..u4,~ 4000 3935.5:2 3:.:.:60.52 26 10 4 .1. O0 4025· 35 3950.35 25 5/_-, .......... 4200 ............. ,.,.~. 115..32 ................... 4040,..;'::2 4300 4205.27 41:2:0 · 27 2/:., .1. 4400 4295.23 4220.23 25 44 4600 4700 4. 800 4?00 · ..~ (. (3 (3 ..... 5 ], 0 0 5200 53C) 0 5 L!. 00 ~'~ ~' (.., ,--, · ~ ._1 .J t.I 44.75.68 44o0. .6:=-,' .z.'-'="",_, 24 45/=,6, c ._, 44.'P 1 0 5 '-' ='' .1. 6, . · d::,, ...5 ]~747.41 4672.41 24. ' 2:3 4838.58 4763.58 24 8 ........... 4F~;0.02 ...................... 4855~02 ......~ ................. 22: ...... 36 . 5021.63 4946.63 2:3 :39 511:3. i 5 5038.15 23 52 .. 5204~5'~ ................ 512,9.,57 ....................... 23 .......... 55 = ~'"'" ~ 87 ~ '~' '~' P .=, 7 ~ 4 15 · %.1 d~ ;~ ~.J. .- .~ ~ ... Ix! 86·60 W 0.06 Iq 86.5(} W 0.22 N 85.8';:' .._W ................................ 0.. 30 N 86,.:39 W 0.31 N 85.39 N.,:,"" ='._,...,.-":' c'/ N :::.: 4. ::::'i.'? 14 0.2 4 5 4.5 4 N Iq 8.'.5. 1 '::) W 0. i 8 5:=:. 23 N N .85. 10 14 ................ 0.. 25 .61 83....,N N 84.50 W 0.69 65.6i l',l N 84, 30 W 0.26 6?:,.62 N N._.({!~ ...... 1.,0 W ........................ 0.54 ..... 73,..7,1., N N 83.19 W 0.36 78.15 N '":"~' :.'-:2 '-.72 N N o.~, 1.-? W 0 .~.~. . N..84.30. W N 84.6;:,~ W /_-,25.4? W 627.34 668. 13 W ¢'_-,7£). 12 ..... 710, ,'.'!.S~ W .................... ,.7...12,.~58 ......... 752.12 W 754-, ::36 '~"~ '"' "7'? '"-' 4 /::',_', 02 W ' ....... ::::: :33 ..28,__.14 ....................... 8 .'35.. 8 :::: 7:3.13 14 875, !? 8 '!;;'13, ].5 14 9id,. :::8 ,--, '" ."! ,~1 ': . I .~ 0, 4.~'~ . . ,:, 7..-.. ~.:, 51 .....":,' '=' '-' zl"::, t,l ,..':,'=.;/- ,, 7 ,'.:-, ,, .., '. "~, ' ' :::"~" '" '7 ' "' #' ~ "~"" , ,,.,, ,,..,,,.,..,,..:,,,,,. ..... t. '~, ,.~ ..... , ":" ' ":"24. '" 0 ...... 7 ... 1 .l',l . '::;' 9' 4 ,.. . ()4 W . .. ';;"..*'.7. ._,='"',:, . , .:,FERRY-.:,LN WELL SURVEYING COMPANY ..: .... SOHIO_ ALASKA... PETROLEUM-CO ................. X-26 ,..( SEC 6 T 1 (:)1'4 F,: 14E ) F'RUDHOE BAY ......... ALASKA ............... VERTIC. AL SECTION CALCULATED ALuN~ _.LO.=,URE T R U E .=, J B- .=, E A C 0 U R S E C 0 U R :.2; E MEASURED VERT I CAL VERT I CAL I NC:L I NAT I ON lr'l I RECT I ON ANL. HuRAuE ALA.=,k.A . . ~: · .-. ": 2--L_i ....... :..' ........... DATE--OF~c;URUE..Y-':MARcH~'L2:.S,'-I- COMF'UTATION DATE BCP.--;S GYRC~SCOF'IC: SLIRVEY M A R F: H 26 .1984 d 0 B N L M B E R A I<- B O- 40015 KELL¥......£ U,.,FI I 1'4~5. ELEV ................... ' ' ' OPERATOR-,J. SM! TH · .. ................ _ ......... ,_,. ......-%.. L 'i. - , DC, G-LEG TOTAL .=,EVER I TY REF'TANGULAR F:FH]RD I NATES; VERT I CAL, .. F, EF'TH ................... DER.TI4 ....................... £ EF,].H ........... .g. EU..?.,MI N ................ DEGREES ................ DEGZ..1 O0 , . 5600 .=,3~:6.94 ~':'11 o4.'::.':." :~24 ~:' "-:'-', N '-'= :::C~ W '::' 'Ci.""'-~ 94 0.:,,,,. 1",* W lO'::'='.,.,., 84 ._ ..~t *° ':': r:. ''' , i: i' '~ ~. · · ,5700. '= ' '" = ";' ~''~ ' ............... ,=,"'"='._, .=," F, F: ¢) ('~ = ='' '-' 68 =' 68 24 4. 8 N ':'/- 5 (") W 0 4. 4 10 I. :L (] N 111 ':'. 4:3 W I ' ':'":' ....· _,4 ~.-~ ::: ,, ,-, _, .":[ 5'~00 5A~9 42 '= ="-'"~ .... ,._,,=, ,. · 42 24 54 N '''":'/- /","} W 0 14 :1. 0:2: .~'q 9 1`4 1. 160, 5:9 W .1. 164 .1. 4 -- -- . . ,_l _1 · _ . · · 600C) ~=z,,-> ,->.-, ~- ~z, o.-, ' '"= '-'= " _.:L~:.U~.,.,~_.W .......... -l~U/-~...u,Z ........ .,/~.; .... ;..o ............... ..,aj_'.~: ........ ...,c, ............. .~..-~ ...... .a~ ..................... N....8./=,....6,.-.> .. 14 ..... , .... ~,,,~,,~ ......... . :.. ' ' "":"-' ' '" ~' ' ~' '-' - ' Z '--I ,':, ,-*,-* " 6100 ..,,:,40. U ;. ..,760..U;.::.- · ..'5 ... [; Iq ,=,7.,=,;, N . . 0.6., . :I.U,:.,.U7 N. ::: 1~4o. U4' W Iz4..~ ./:,7 6.,..OU ..,..~... ~._, ..,854-. :~6 . 1..: . N ,= ....... U W ]'-' '" lq 87. 10 W 0 "'; '=' 3:=: i 6 4 0 0 610 9 :"-': 6 6 ¢ ¢ 4 3 6 .,::./=,,=, - .-:, .':, c, ,:,._":, - · ..... , 1 :L :::: 4 N 1 ,.., 7,_, W 1 '-: '::' ~ · · 6500 61';-0.1/=, 6124.1'6 26 3 N 6600 .................... 6289.~06 ................. 6.2.1.A,,,.06_.:,,,,_:~.,. 25 ............. 52 I',1 6700 ·6379.17 6304,'~7 25 30 1`4 6800 64.69':54 : 6394.: 25 11 ,N - ¢1" ' ~- "' ~- ,=,~.. !)..":::i: ".i; 7:: ,."'~~:~ ' ..... 6., U 0 ............... 6,.~6g .... 1.,,~ .................. 64 ,., ~.~,1~--.:..~ ..... -.,:4..., ..... ~.~,1 ......... 1'4.. 7000 665 .l. 06 /=,576.06 24 22 N 7.100 6742· 32 6667.2:2 23 52 'N ............... 7200 ......... ~'" ..... , o~ =,') ,- '-,'-, ':,':, .... .. ....... ~(., ~w ~ . . : . 7300 6925.85 6850.85 : 23 0 . I",l 88.39 W . o.58 114.!57 N 1,422.19 W 1425.21 88 ...30 W .., 0 .... 19 ...................... 115.,,8 :'::..,,~N..,,?~.1.4,6 :ZL...,?&,~M..,_,.,__~.L.,-~6L3.,..Y'F~ 88.3'.:'.> W O. 37 117, 08 Nil: ':~:: :I509,:30 1 ].. 94 '-"-' 39 W · ' () " ' '" '-' : =' ' ''~ ' ': :=~"Z :, 1 .t 1,'_',. = 7 N, 1,.,5,=. 11 loo [.._,.~, , ,=, ,-, · ,87. ,-,o' ~ ' .) . ,:> ::,..:17:: ,=o =,' :'37 '-'c '.',":' '-'"'" · .:,.~ ~ 0 ="-' .., ,.:, .1.~'-' i · ,.,,_, N 1/=, :36 · 00 W 16.:, o · :L/-., :.2:7. 0 W O. :52 123.4.1 1'4 167/=,. 82 W 1/=,78.91 8 6.5 0 ,,, W ............ ,??)C,,, 0,.:.52,_,,,.., ~ .................. 125 .,,68?.,N .......... ?1~7 i,,6 .,, 8, .4,T,.. W ,,! .._:.?~ ~ L7~1.,8,.,,,89 ::E.:/=,. ~(") W · O' '-":" ":"" .~q -'"~"" .... .:,,:, I.~.,:,. 09 N 17._ 6 . 16 W ,1 7._ ,:,. 19 7400 '7018 14 / '-"¢ '~' ':"":' · =,.-. 4.:,. 141 16 ~ ' ' ' 0'-' '~' ' ,'~. .............................. .7- 0 U .................... 7.1.. :LO-.... ,., ,_-,-- ......... ,~. O,,:,.,.t....o.,:, 76 F). 0 720:3 .9. 2 712 7700 7 ~; 7.26 7,... ~..':' '-" '-"· 26 ~""" I .~.'" ' 1`4 7 F: C)C) 7'::':/C) · S 9 73' 5 =':~ ":'" ................... .... .......................... t .....~ .............................. .,:..k ................. 4 ............ N 7'--~(');. Ch'~484., 12 7409 1 '":' 20 21 ' N Fa')C)C) ......... .7577 94 7.. U.~ 94 2'<:) '""~ N '" 1 O0 "~ .... ' ")'-' =" '" ' '- 7,.., .*,Z...,U.: .............. z 67,~,...:g o .................. .. N :--: 200 7766. :2: 6, 7/_-, 91. :2:/=, _1. 9 20 N :3:2:0 (2) "~'-' / '") '-' .~.5 C.) N . ,:, ,: .... · 8:2 77,: ..... ,:,"" ...'-'_1. 9. :? 400 '-"-' '=' = '-' '-"-' C / ;-._,._,. o I 7,:,,:, .)...¢ i .............. i9 1 i N :3500 ""'" '~ ".'/ '='; .s., ,::,,., ~ .". · 7974 ?~'."' 19 57 N N ':'=; A9 W C) %.,._ ~ . , # 85.6,') W O. C."~""'..:, ::,'i'. (") W 0.61 . ..... . 82.69 W :.-','1. I() W .... 8.0....;2:9 W 79. 801,4 7L=:. 0 id ,:= =;,.., 14 '7/:.,, 6O N m i..i ..,, O. 76 0.2:::.2 0. (:.::2: O, 84 SF'ERRY-SUN WELL SL1RVEYING::COMF'ANY i...:: !'i:.:i~.:I PAGE ~ ·~I~'' AIxlCHCflRACqE :. · ' .,' ;~': ':!" 'i~.~ - ,-. -' ,"' ' '",- ' · '"¥:.:: : -.:' 't". ] , ' ~,~'; ::?'i.T.~.~, :i "~'~, X-26~.(SEC.' 6 T_ION RI4E) C:OMF'UTATIC~N DATE PRUDHOE BAY MARCH 2/:,, :1.984 ....... ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE TRUE SUB-SEA COLIRSE C:OUF'(SE DOG-LEG MEASURED VERTICAL VERTICAL INCLINATIAN DIRECTION SEVERITY BOSS t..,YRUSL. L~FIC F:;URVEY ,...lOB NUMBER AK-BO-40,¢) 1..., '='' ..... K ELL,Y....B-.I ,=, !.41 N L~ .,.~ EL EV ..... =. _..7... ~ .,,.. 0 L~.... ET_ ..... OF'ERATOR-d. SMI TFI .. . · ,,, TOTAL RECTANGULAR. F:OORDINATE:=; VERTICAL(., DFF'TH DEF'TH DI='F'TH _.., DE6'~ I'11 Iq DEr:.;REE'.=; DEA / .l'o,r) I',IInRT 4 Z.SOLLT..~J,--,_...EA~E~TZ.WE;ELT .... , ................ ~ ~ ...... ~,-~,,.. ~ "-- ...... .,-,..~,.. ?~.,,~ .,, ..... ...r~, ..... , , . ' '-" ~ ~ "~ ....... .,,-~..~. ,'~ ,..~,, .? ',, '" ~ -~,~ .~.,,. '" · ' :R6oO 8143./.-,2 '"(Y :-~ 62 . · . ,=,,.o,,...:19 2:7 'lq 74. '-'(' '.0' 70 1'-"" ""~"04,"'~3'i:::W':':: 2211 4..=.; o., W Y..'. 0 ,...,,-,.-,.-,~.. ., ~ ,-,,., ,-,..., &.-',.., ,~,-,' ' .: :.: .., .:.. ':;,,.. . .-,~.... . ' ................. 8700 ................... .,.,.. .... . .7 ................ .,...~ .... .,.. ....... 7... ........... ~. ......... ~, 1'4 73.:.,10 ..W....-.-..'i:Z:%':Q....60:i. ............ : ........ 201 ..~.~:=.B~. '-' '-' ' ' '"' '~ = ~' ' '-"~/- ""' :'-] 9 W ,:,,:,0o ,..,':"":'":'":'._,..,.,:.. :2:1 ,:, ..'-...,7.31 l:E: ..,6 N 72 . 0 W 0 .6':1. 2:1..I. . 09.. N .~.~..:,,:, · -. 2:27/:, . ::3:2, , :=:900 o .-, ' ,_.-,:'.:: 1 'R '~' '~ 9 ,.,4.~6 '""" '"'-" ..... . ,:,,:,._, , ,'" ,:, 1 0 Iq 70 I W 0 5c,, '.."~ 1 62 Iq 2299, 15 W 67 ':'!" '" '" '-=' '-' ' "-" '-' ~" '-,~ ' '--,~ "" .... ' .... ' """} " '-' '-°'-' C) ~ ~'' '-' '-, .... , '-' ~¢~¢)~ ,-, ,.'1 , ) ,-,4.4.6 ,~ ,-, z4 N ~-,: ,",~) ~) .-,~- .~'.-,. /-,':~ .' · ,.. .. ,..,. ,, .z. ................ ,..... ,...u, ......... ............. _,? ....... _ ........ ,.,,., .... .... ............. .,,..,.....__ '~'~': - ...... :"':--":.:.::.-, .... --'"",4L-." % ' ']-, ': 5'"': :, ",-7--"":-,' ........ ." · ' ,-? ".::'- ::':'; :-'. :' '.' · ....,z ,,"' .. 100 '. ,:,~ 1,5. :.,~/: =,.J4:1...~6 ?::¥ ..1 .;, .:::i::.::... 2371 20 N 67.1.,: W .?'?.:.....: 0. o6: . .,: 1.4. ~.~ . . .... ~..'- ...... .,:.,....,:.~ :1.7 37 N 67.19' W' 0 , '" , · · .,:..o :l. 24 N .,::.44,., W 24/:, 1.40' .9500 899/:,· 53 :=:';,'21 F,""' ":":""-' '":' 24".','0 ':']'.-" ..... · ..:, 17 2:6 I',1 66./_-,0 W 0 18 ,.,:.. .... :, 12 I',I .,:.473 '-"-' W ~ - . ¢~ - ,~ ,-, ,~) - ,-, . .-,.-, =. , - . .-, .... , - ,:.- .-,~.. · -,~)(~ · ). ,-,-, , () E, ,-,/-, .-, .' N /-,, ,. ¢",() () .-, .-,(~., .-,., .............................. ~ ................. .~ ....... ;L....~ ..................... 1.... ...................1..7.. ....................... ,. .................. ?70u :. :: 1 c, 7. ,,:: 1 .-..1. i ~ · .,: 1, .1, 7 . ,~ .. N 6...,. ': '- _. i'.';'!'=i':' ',i. '-i.._'::' ':' !"= .i_ ...... :'":"ii ':' "~ "'7 '.--~ ...... ~'"'"."~"~'"'?-. '.i "~_,': ........... :..~,,-,. ,.---.'": :'. =~' ?.?..'::'. "-":,=:,:.-, z,-:, ..,,,,,. ,,..,.... . ..,,,......,,... ,., " · I' I ' '" i. 140RIZON]'AL DISF'LARE~ENT = ~68 .4~ FEET ~T NJR]N :'~';" DE'_O. 4:1. ~IN ~ST A'r ~D = 9770 ...... THE.. CALC:ULAT I ON F'ROF:EDLIRES' ABE BASED. UN ..THE.... LI:,.E~. 12 F....,.T. HREE D I MENS I ONAL ..,,RAI:!.IU.S;_OE_CLIRVAZ, LJBE.,.JdEZBEI~L SEC I:'RI_IBI-~_]E: BAY MARCH 26, 1984 dOB NLIMBER AK-BO-40015 :~..T.~-~::~A1Cu~s: ................ ~-c:~ ~v~' ~o°o _ .... _ _ .... .... ~: l~ ___::'l:: .,::. ..... ,. TRUE SUB-SEA TOTAL ....MEASURED~_,VER'IT,,I 1000 .9'.-?'.-?. 92 'P24.. 92 5, 71 N 10,81 W 0.08 O. 08 2000 I '.:.~'~¢':?. 8':? 1924.8'~¢ ' .1. 0.28 N 13,, 48 W 0'. 11 0.02 6 5000 4838.58 4763.58..: .' "'":':',:,:,:'~'.~. 62 N 7':P3.02.' .W I61:. 42 '.:.>6 ,: :-74 . ...,. .. ............. ,60.0,0 ....... .~JZ,.4.Z~,~.~-_-~.6Z&--.;,,.~,~-~-~_,~.O.~O,4,.N .......... ~,~ ~.o~,~,w~.- ...... _~-~,~_w~. ................ ~,o~a~ ............ 7000 6651.06 6576.06 121.38 N .1.636.00 W 34L=:. '.~'4 '.:/8. :--:7 8000 7577.94 7502.'.~4 i50.61 N 2009.4]. W 422.06 73.12 ':~ 0 <] 0 ....... ,.:. . .. , . .:.' :.' .::.. X-26 (SEC 6 TiON R14E) COMPUTATION DATE RI_I[~E BAY MARCH ~6~ 1984 dOB NLIMBER AK-BO-4001._, ~ ~LASKA ..... ." : ,:' -' - - : ' - · , . . . L F ERRTUR-J.- SM I TH'.'::' . ' ~ ] :' .. , , . : ' ...::: ,... :__.~~ROL~ED_VA~I~OR_EVEN..,.2.OO_EEEI__DF~UB~E~~L]]~' ://y~'~ ...... ' .... ; :.L:.:]:,.:~';:~;~:.;.. ]';.: ........... :::;;~.. .......... -- ..... ' 't'RUE :.';UB-SEA TOTAL .... ME A S,U R E D ........... .VER T.I CAL ........ ~.E B..T.,.T.C.'.A L~.: .~ E~T ~.BIG I. IL A R ...... C;O 0 RD.I N~ T,E;E .....MEt.: T V,D I-- ' ' , ":'' ...... f" ,' DEPTH ['-EF] H DEF'TH:,i'.:,i.i c ' '- , ..,,: N JRTH/.=,uLI] 14 EAST/WEST :,:.:DI F F EREN_,E o c,.. o,:,': ..--_z...~ :.:.::o ~oo, . _..: ............... L,o..~:.c:o:"::'":: ~,:"'.::. o-" oo 7 5 7 5.0 0 0 . (") 0 0...:.""'._, =' N0 · ....,:.":"-':' 14 () . ~:~ () 175 175.00 100.00 1·14. hi 1.19 W 0~01 O. O0 0.01 /--,7~ 675. O0 /:-,00 O0 4 '-"-' . .... ~ Iq 6.'~>4 W 0.06 () 01 77.5 77.5..0C") 70('). (:)0 4.5:1. ,N 8.27 W (:). 0'7 O. 01 · _,E_. 6 TiON R14E) X-26 (c.-p F'RUD~_]E BAY ..... ALASh'~A COMF'UTATION DATE MARCH 26, 19:::4 dOB NLIMBER AK-BO-40015 TRUE SLIB-SEA TFI]'AL (" ......... MEASUREJD ....... VER]" ICAL_.,_.VER~.T_ZC~L,,_~RECL~ANGLILAR .... C;OQRD I NATES ..... MD=T..V. D___ _-,.,,.,,~EF4."£,,I GAL ...................................... ;.--. DEF']'H £ I=.F TH DEF'TH.i'::::;i::: N JRTH/."F;Fd ITH EA'.::;T/WEST: D I FFERENE:F CFIRREPT'I ON 1,c,.7..5'-' ........ ,,_.'L~,Z,.k.,,O.O::' = ' ...... 1.L-Z,.OLL._O_O. · :' .... *:-:: .'::.::i::,.::i :L ~ 'L.C,~,i,6_N~' " ....................... 13..&,:._...W_-- ..... : .... _ .......... ~t. ....... 1_1 :::'::!:::" :~:! :'. '0.....0,.0~:,'= ...... · 1 ? 75 J. 975.00 190 ("~. 00 10 . ~:"*'.:,'-' N 1:3 . .~]_ (]. W 0 . t. 1 O. c~_ 0 '-'~'~'"= 207 ~. 00 ";' 0 (3 (') 00 10 :::9 N .1, :"3.44 W 0 ~ t 1 0 00 .'" . /._1 _ ,~. ., . # - .,. · · -, .=~ ....... 0 :l ":' 0.00 2675 ...67._ .00 ' .:' /-, (') ¢) O0 :l':' 9'7 N :ll '7,5 W .":..~' .,-.,~ - . .-) ..... ,':~ ..:,7..7..,,. ............. ~ Z.Z..,..J.).(.I .... ,,~..7..L).(.L,,.LX.~' ..................... 1,,,..~ 1 ....... I',1 ............................. 12.4 Zl.._ .,W,.L,.,..~,~:,rr ................ Ct.,.. 1 :':: · ~'-'"'=' '--'R"';~. O0 '-""PO O0 J. 1 /:" c:, N 1 '"'' .:,. 24 W 0.34 ,:"). 2 2~76 ..... o'~7.~ · 00,!," ~:'":'°nr)..,,..,.. 00 11.46 N :~- 1 . 41 W ..... 1 "21 · -~_ - o.' = ..... -, ..... ': '--')'":' N ............ : ............... 46,.:,!.~.2_W.--~:~.:.,,, ..... ..2.,..A...t .......................... :2',':1.79 :2::1.75, O0 :3.l 00, OC) 1'2, ?6 N /:5, 2:1. W ' 4, 10 1./_",:.--.: =;"':' ':":' (].~.':'; W 6 '7 2:2:--: 1 ,.,':"-"-"=..- / ._,. O0 32C)C}. .. · O0 1 ._?';.... = N ,..,,,_, · . .. · 2 ,/-,':.:'_ . X-26 (SEC 6 T10N R14E) COMPUTATION DATE I='RLIDF~]~E BAY MARRH 26, !984 dOB NUMBER AK-BO-40015 ...... '. "<~].:'.":).;~.'~,.'",~'~'/':', ', OPERATOR-J. SMITH .... : ~..,,. ,., '::' ' ':'" '::::::' ~:- · .. ~: TRUE SLIB-SEA TOTAL ...... ~IE~SURED ......VEB~T.I.~:~L.___~VER'.T. iQ'~L~_£(EL":~NGULAR ...... c~OORD INA DEPTH DEPTH DEPTH NORTH/SOLI]'H EAST/WEST :.' KfIFFERENCE CORREC;TION : .' '" :',' ": :...i,':,:,:' ' .': :..' '.;'i ,.,:. ~., :.~; .. , , ., ~ . "/' .' '~ .' - ~- .., .. . :.. , : ,~ .. ,,..~ ,.) . .~,,_-,L)t 00 :_24 10 N .-:,.-- .... 27 W ..7~ ~/-, 11 48 '~'--,~"~'~. 3875 (]0 '-'"'" ] '-'"'"'= ..... . ._._ -,,-,' ?-.,,,:.? 4043 3975.00 3900.00 37.00 N 3 ::,' 4 '::"), W /~ o. 11.42 ................... ;,,,. ............... :-r,(.,..,,r .,,,,,~ .......................... ,,,.~~. .... :,...-.., ..............~ ......... : ........ '-. ,,,~-,, ~, .:,,',~'.~. ~ ;:, :~ .'. .' :.. ,..--"'-- ....:."7:?,.':?'i~:.']:' ·~ ... ~ ...... ':','. .... ....... ' ' .' ii.ii · 4266 4175'0~) 4100.00 :.:i',, :'~::.:,., 4J:.J,;~ N 4:=,:t,..,=,.W ,' .... ?.',.... :,..~'.~; i::.J~ . ~., ::. :',;,,:? ., .:.i:.~.. . ~ . .. .. ' . . '.!'" i' ,."i '-' ~. ~-..~,~- ~-~ - ' i':". i ~.'~.~. :~'.; :!: ~, 'i,'!<' · ,i,;'~.~ : , i ' 4377 4L~7=,. O0 4~0¢1.0(; -,.:: ..... 4/_-,./_',._, N .a...' .'.~. ,_~C~... W · ...10.~. . ..,.... .... 16 W 124- o5 mm .-- # .ad.-. mm 4599 44.75 00 44C~0.00 54 ~1 N /-'-'~ 10 7'7 ~, 4.7A9 4575 00 4500.00 ~?-' 5~) / '-' 34 10.64 m · ~ < ...... N =' 7 ~. W 134. C'C .................... ~8~0 ............... 4/-75, 00 4/.nn~ ~20 A2. ~6 N 71¢~, n6 W 4~c,-~c.J 4775, O0 ' ~4700,:00'}':.'::"~.:':"::.: ' 66. E:~ N 764.57 N. ~ ..... ....... :.'L55.2':~ .:. - ... f~A'::o...~. 4c,7~"' ~".X.)C" J4800. O0 .: 7 ~ .... 24 N 809. ;~, :.N?:"..'"~ J 64.. ::~_ . - -:~. 62..'.":".'. :' . . -.- _._, ~,_, ~. ~ ...... ,~--, .'-,~, 9 19 _ c, .) N ADA ~,,., 5~,,:, ~,07._,. 00 5000.00 ""(' '~2 .:,c, N ~,-.:, ~.: .... ,,~67~-'-' -fi J 75. O0 -,~ ~ 00. O0 86 .03 N ')40, :37 N 1c~':'.. ... 65 9.37. .--, ~',.. .: (~' '~:~2n('~. ~0 ~ .':)0,..37...,N ........... .......... 9:::4./-,::: N ~02. ~ :L ...... 57..,~ ........... ~ .............. · . ~ 77 ................. ~.. ~..Z,...,, ..... ~ ........... ' ......................................................................... . ff9~86_. Ooz..~'w5. 00 ~'"',Jc, OL') .: 00':'. .... :. '7/4. ::~:'~P N 1 (.)~.'. '~":" ~:9'7 .. ""='/...,. W :~'"'......" .... :.~ ..':,.~'J' ].... 87 .... ,." ::'.,:~: 7/-, ' "",:., .:,:~:::.".- .:4: ..-... ..... '. . ': .' '.:.':':'::':::~"' ::f":::f,",:." ' 5~96 ._f::-.. ~ ~ .... ~ 00 5400 .': 00 :.:? 9. :q_. 07 N 10 7.. . :38 W .,~ ~ 1.86 .: . .:: _.JSOHZ.O._...ALAS~;:A_P.E]:REd_EuM-CO,. -26 (SEC: 6 T1C)N R14E) F'RUDF~OE BAY ALASk~A ....................................................... ZN_TE R P Cl LA.TED_.VA L. U ES..-. F_ CIR..-. E V E N-. 100. F E E T-... O F--..S.LIB .--S E A'DER-TH I_.LIMF _ 'T AT I F~N DATE MARCH 26., 1984 ,..IFIB NUMBER AK-BO-40015 -"L~' ,-. ", I --. "~ ~" ~ ..' :..;.~ ..,.__ . ........................................................ .~:'-r~L..Y,_BLISW.ZNL~?.ELF-V ............ -¢....~O0_E..T ......., ;:iii'::::ii'~ .i.ii:~.OF'ERATOR'd, L:;MITH. . , TRUE SUB-SEA TOTAL ......... MEA~;LRED ............. VERT.I CAL .......... V. ERTZCAL ....... _.REC..T. ANGULAR ...C;OORDI NATES ....... I'd D =..'F,. .V D............. VER:T~.CA~ l ' I]EPTI4 DEF'TH DEPTH '.. NORTH/SOLITH ER ..... ' ...... "' -'~'" '" :":~: ' ' " · -,!/NE.:,F 'DZFFERENL. E . t..3KREL. TILIN :...... . . . · 5%tz. nn .' ':::. on:.N il ..' - :...' ':, ':' '"':'' ":". ' ' ' 6 7,..6.2...._.~__~ : ._=..4..,~...i.~ .............. .~L.O.,.~_~, ............ . .... ' ~' '=, ~ ~"";" .... :' i 4.. '75 W '-' ~'''' 6u...7 .:77.. O0 , 106 72 Iq 1,. · . / (.)(.) 00 / . . . ..' .., ..'.. 77 i 0 5 61 '- '- ~'-"-'~ ¢)0 '=,'-'0 11 (')2 U,=, · 69 N 1 '? ~' '::' 92 .... :'~' ':' 7'::' ..:: ,:: W .~ ........... ._ ,:,/..,, ._ ,:,. 0 00 1 ' '-' · -,~"" ~:',-, r= ..... , .... , '~ '" ~5 """-' ' ZZ ' 6.... ,(~ . ,.-..7.. ,- ()()."-"q?~00,_¢)0 _ ~..~,;L10,..4(') N ............... 1. ,:' l ~... .(.) r".-- B ..... ~7 ...... ~,~ ............ Zj--...L.:I ................... 6:361 607..,, 00 6000.00. . 1.1'1, c~':R N 1:'_::.61 3:'_;-: W'i"..:':':.::."...' .'.:' .,:.,:,6 7:3 : ' 11.., .. 1 "-. ' :':-.".' '-"-: . . ,.....,..., :.: -, "" .'=; .'.: '.":""",':"', i .1. /_, 47..:, 617,_. 0 O' 6 _1_ 00.0 O, ' .' 1'14.24 1'4 1410., ..:':,'-"-,:, W.' .., ...,....., 6 e, .~._, 6,.. 7..,, 00 6200.00 117 .02 N I ~_ ¢"). 7 .31 W ._,.~.... "-11 .0 l ' '-' ') ='=;, '~ 6.=,. W 331 04 10 66 1,:, :'::4 N 1._,._,'+ o¢,L 6 6475 · O0 640('). (0(:) 1 ' '-'. · '" · . ...................... I.:1....,:, ,.:, ......................... .. .......... , .............. W .................. ~c/I.:,i ....... 7. . ........................... 6., ..1..6 ................ 65,75....00 ........ &5.0,O,...OO___?.~._..,..t_t,.S/,.._8';-~.. N 160_1..26 ' ' .-, .--, r ,-,.-, 7026 667._,.00 66()0,00: : . . .'121.P,':~_. N 1646.84 N .L": .... l,=,. . . . · '" '-'/ 360, , . ....... ,:, ,.,'-' ~' "~."- . ? .1. ~4.17 tq 1/_-,9 .1.. ~ =,.. !,4 ,:::.:.::'!':.:;':: 7:.'-: '.-."¢ 45 .... 71 677..,. 00 /_-,700 O0 · ........... '~ . · ,-J' ~ '" '. 0 '" . :.:" ..: .: :. '.:'. '"':' :" "]~ " .. ' "~'-' ........... .7.24:.4 ........ :6~.~.~,Ltf3~._e,~ O0~O~%:~ ':':~ ~.~,L~..7.6.,.N ............ _:L,/.~zL. 7~,._,c, .1. 3 Iq .1.776 90 W :378 36 ::: 63 ,:, .. ,._. 00 6'P 00.00 .~ 7. '7 . . . · · · 74/=_. 1 7075.00 7(::)0(:). O0 1 c::z · 14 N 1 ,=, I. 7.71 N .: .... 6.4 :[ ,::,'-°. 05 7.~/", ''~ ~ "' ')" ") ' "' '"-/' '-' "'~ '" ''-~ '--'OZ~ ~"~.-., .__7.;LZ~:,.~..U.O ......... 7.1.t.V...t.fJ ........... . ............ 1,.c,.4 ...... ; u. B,I ................... Z.c,,, 7,,.,..;,; ....... H ......... 7~7._,. oo 7~00, O0 .L ..,7, 7~:, N 1 ,: ..... ,. ~, ;/ W ~01., 14. .:' .... :.... 7.1,,~ .... :: .... ..:...,......;...: .,.:.... 7676 "' ~- ..... "" .... :' - ,:', ,-,,~,=., ,- :. ' z ".' ......."', - '" '-'"':' :.".:'.":: .... ';'..'." ' ." - '"':' ' "' ~ "' 7.:,L U. O0 :I. 4.1. 02 Iq 1 ":':,/:_'-:4,04 W :"" 408 ;. 30 .:.:':; 7. 'J. ':::' 77,..'~..., 7.:,7._,..,UO ' '-' ]' . " .,:, ,. ., ,--,,-- ) . · ~ ........ ,.-- .--, .. · ,- · "-z .'.-.~ · · ,::.'. ."', - ... , '. ,.-.).,4-, .": . ': ' ............................ .7oY. C ......... Z.4._7...,....0_0 ........ _7400-.-.0.0__, ...................... 1A.,_,...,.::,O ~ N .................... 1.S~7..1 ...... , ,.~-W .... ,..,~....4..1...,.,...,::..7- ................. -...=_6.,..~.,~ ............. · ............ .. ...... .. SF'ERRY-SLII'4 WELL L=;LIRVEYING COHF'ANY: .:. : .::, "..i' :~.. . . ANL. HL RAUE ALASKA ," - - ~' .' -, - ] """ '. .................................................................... :.,- .... -~AT. E-L.:~E-..~', U K.V E ¥-- Id.AR L;I.'&,...,..~,..,, .... 1 ..... =,-4 .......... ~Uld.I.EL~L A._,KA..-,F. E-T R E LEUM,-t;o ........................................... X-26 (SEC 6 T_ION R!4E) CFIMF'LITATTON DATE F'RLII-I~i]E BAY MARC:H 26, 17,'84 ,JOB NLiNBER AK-BO-4AO`15 '=' '"A ................................. .,.~ALA,.,k. ....... ......~,.,,,~..~ ................ . ....... · ! : ... :: · ; ' .:17..'?: OPER~TOR-d, SMZ'TH :::?;,. " ' : ' .-" :i:',: .: .: :.. :' . · : . ..:.: . :!.'::.: . .' · VA - . ~ - _ ,.. ,-. TNT. ERFJ~LAZEDL, .LUES_EOR EVEN..,.:LO 3_FEET._LIF.--~LtB.-~:,EA_.DEFLZH~.:-,-.~-- " TRUE SLiB-',:;EA TOTAl_ ~r' MEASLIRED ......... VERZI CAI ..... VER'E.LQAL .... REC. I.t~N6'iLILAR .. CooRr:~ I NATES ........... h'lD.-. ,T. MD ..... . 'l " I , .... r- , ..... . --,-. DEF'TH [EF TH £EFTH . NORTH/SCd. I'TH ~A.:, I/kll:,_.:,T . DIFI--ERENCE C:ORREC]"I ON ·" . ,:,,- = - ' = ' "";:~"::"'":':'?:.:"-'"".=," . :34 W ' ':'. :'.i .'..42~,'~Z "?:'.' :' ...: ./.,,,./.,O'.'.'i ::.":.:.:i ..'. ~.. -.,'-, .~7 , ()~) . . ,0¢ , o0...:..;....:. ..... .1,. O 44, N ........... 2008 ................. 7..,, ...... ~ ............ 7. ......... , ...................... 7... ~ .......... . ................. ,. ............ 5/:,. ":"-':.' 428 15 8 `103 "' //-,7.,.,.C~A_ '?/:.00. O0 1 ~= N 2()4:::: . :::6_ W . 6 . ~::'::: 8209 7775 0 A 7700 00 162. '?':> 434 1 = ·. . .... N 2078.._, '=1 W . .j a_·0,3. '""'-' ,.7. 8.7, 5,...O.O_,..,...__.Z...800..,..00 ....... Z.6.R..J} '.'.?,...,. N ,: ................ 21.1 ':'. 5 ::: W 4,4 c). ,["} (") "5 '::' F;, · ,:,,.:, ]..'=; ,=,4..'U 7975.00 79(':,C) (],0 ':1.77...2'P N ":' 44F':';. _,...., . .... .... `14.6. :2/i, W 'F.' ':=' ":'- .... '"' '=' '-~='-'"' ,'-"4C~7!--,. O0 8000, O0 ~,~',.~ ~',v :21 :..:: :1. 1 ::: W 45'-' `11 /. '='5" '" :'"" ':' ~.._,~., ...... ,.c,,_. ..-. N . ~., ...................... ,-, 8;..4.,.:, ............. ,_,_:LT.,J.,-O .(..L~ .... :,. :L.O (.L,..U..O .......... ~_2...'A,~ .... q.~.....N ............ .,~ ~ ~ ._, ......... ,.: ...... W......=,:.-;~_. .... .4....,_, ,~ ...... .,' ........................... ~.. '.'4-~"-":¢ '-'"~' 5 '--'n= 05 1'4 .,. . 4/:,4, '-"-' 6 06 ,:. ,,:, .-. ,::,...'.7._ · 00 ::~2~-)(') 00 "::'24'':? · '"~':' .~ . ._t ... '--~ W # · .... . · .:, C, ,-,,-, ,~ ~- ,.-,.-, ?] '-, ~- .':: · . ~1~,·/-,4 N W 470 1:3 5 76 ¢, ,:. ,, ,_,,::, ,:, 7 ._ 00 8300 00 _ ..:'""~ ,:,'"' ..~'"' · ...... ::~9.=, n :::4-7..,-':~,~ O0:::4nn. c~c~ 22Z.24 N ':":' ~ ....,:..., .t 4 .._72 ._.,.W.. .4. Z 5.,.8.:.-.-.'. "' .., ',-,',,' (') ~ A '-'~ ..... :,._,7.J. O0 ,.':' ~ ('" C) ....... O0 :'.':,.-':',,.v~ ::, ,.")=..., N 2:.:.:"1-/_--, ..... .'-5'1. N 4o'" .1., 48 r,=: ,Z, ' ' ....... '::' ..,~ 91.6I 8675.00 8600,00 ' 252, 11 1'4 .............. ~2 6.7. ...... 8~'ZE.,..OD..L ..... B7DO..,..O.O..--= ........ ::.~.,~65.-.6.7,N. 9372 '-"-' .=, '-'"'" ] ":'-'-', ,=,o 7 .... A 0,=,.:, U (.. .00 ..'- 7,=, ("~ :1. 1'4 'F."-"!-77 8975. O0 8'.-.-,0C:,. O0 290.40, N .9'582 ................ 'r:-.'"'OZE.X)O ........... '~'.."000....,00 ................. 3.,C~ ;'-: ..,.i 5.,... N 9687 9175.00 9100.00 316.20 N '!.~770 9253.96 'i;':178.9'6 326.5:1. N THE CALCI_ILATION F'ROCE:F~LIRES LISLE A LINEAR INTERF _LA FION BETWEEN ]'HE Iql--.ARE._T 2(], F'Or-iT I"ID (FRf'iM RADI ..I.:, i"lF I':l IRVATI IRE) F'CIII`4'I":':-; · : , Sohio Alaska Petroleum Company Our Boss Gyroscopic Survey Job No. AK-BO-40015 Well: X-26 (SEC 6 T10N R14E) Prudhoe Bay North Slope, Alaska Survey Date: March 23, 1984 Operator: Smith Scale: 1" = 500' 9770 'W -sob°, oo -~sb°. oo -~05°. oo -~ 5bo. oo -~ oho. oo -sob. oo Surface Location 200 NSL 617 WEL HEIFi I ZONTFIL PROJECTION TRUE NORTH' Q,~,, QQ ,, --500. O0 ': SuggesteG ~orm to k-e inserted in each "Active" well folder to dleck for timely compliance w-i_~31 our' rc<julations. - 0~e~a~or, ~el rName and Nu~r Reports and Materials to be received by: ~-/ Date ~equired Date Received Remarks Ccmpletion Re~ort Yes Well History Yes , , , Co r e Chip s " ~< ~/~-~ -~'~'~' Core Description ~.I~/~?~..'..- ' Registered SuI-vey Plat 7S ~' 0~.. "~ ~---~y OK Inclination Survey //~}~ Directional Survey_ 7t~¥.~_. ~.>,,; Drill Stem Test Reports /}'/..~/~- Prcd~ctiOn Test Reports _//?~~r~< ' -' Logs Run. Yes Digitized Data y~__ ~ SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO EXXON ¥O: PHILLIPS STATE OF AK CENTRAL FILES (CC# ' s-Transmittal 0nly 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 'Date: 4-5-84 CC#: 75189 REFERENCE: __HIO MAGNETIC LIS TAPES & LISTINGS ///~he following material is being submitted herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- X-26 3-29-84 #- O.H. LIS w/ Listing GO #252539 Tape Pos. # O.H. 02915 (4182) *SFO & EXXON: An~steri,sk.(*) next to a listing abouve means you should have ,-;.¢~ (~ ;. .~ .. _ received the Tape(s) ~~n~ i~i~~f~ ~e respective service company. Please confi~ this. RECEIVED Development Geology DATE .......... ;:~ '~:*; :' : '-' "' .... 1-9~::~/~)ri Well Records INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 lO: SFO/UNIT/ GETTY STATE: MARATHON Date: 3-27-84 MOBIL CC#: 75172 PHILLIPS *STATE OF AK * Date to State Via Drilling: BPAE (Transmittal Only) .... REFEREN~NTRAL FILES(CC#'s-Transmittal ~nly) ~~OOP~/__ HOLE FINAL LOGS ~- following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: ~ X-26 DiL 3-12-84 ~! 9239-9760 GO X-26 BHCS 3-13-84 ~1 9239-9756 GO X-26 CDL/CNL 3-13-84 ~1 9239-9760 GO X-26 CDL 3-13-84 ~1 9239-9760 GO X-26 GR 3-13-84 #1 2599-9238 GO X-26 FORMATION TESTER 3-13-84 #1 GO X-26 Laserlog/WEL 3-13-84 ~-. 9250-9720 GO 5" & 2" 5" & 2" 5" & 2" 5" & 2" 5" 5" STATE ONLY: DIRECTIONAL SURVEYS: _ +~agnec~c Single Shon Dir~ccion~t--~ Date: ~ r ~on_al $,~~ Date: APR DATE Alaska 0il & 6as Cons. _ . Job#: Job#: Carolyn Bishop Development Geology Well Records March 9, 1984 Mr. R. H. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Dear Mr. Reiley: We have received your letter of March, 2,1984 requesting the waiver of Rule 4(~) of Conservation Order No. 145 for the drilling of future wells on the "X" Pad. In this letter it was noted that during the drilling of .the 20" hole on the Prudhoe Bay Unit No. X-26 well there was no encounter of gas. _v~is letter will advise you that the Commission has examined the evidence available and hereby waives the requirements of Rule 4(b) of Consent'etlon Order No. 145 for the drilling of future wells from Pad "X" in the Prudhoe Bay Field. Yours very truly, .- ,.' · . .. Lonnie C. smith Corn:als s ioner ba:l MEMORANDUM TO: THRU: FROM: Stat- i of Alaska F,LE No: 4I. 6 Lonnie C. Smith '~;'~ Commissioner DougAmos~ Petroleum Inspector TELEPHONE NO: SUBJECT: Witness BOP Test at $ohio's X-26 Well. Sec. 6, TION,R14E,UPM, Permit No. 84-30 on Alaska United Drilling Rig #2. Friday~ March 2, 1984_: After witnessing the meter proving at ARCO~s Ku'paruk C'PF ~I' I traveled to A.U.D. Rig #2 to witness the BOP test there. The BOP stack had to be reassembled after the rig move from Cross Island delaying the BOP test, saturday, March 3, 1984: The BOP test commenced at 7:00 pm and w~s CJnclUded at '9:0'0 pm. 'There were no failures during this test aha I filled out an A.O.G.C.C. BOP test report which is attached. In summary, I witnessed the successful BOP test on Sohio's X-26 Well. Attachment 02-00IA(Rev. 10/79) o'-"& ~ #4 ~/~0 STATE OF AI,ASKA ALASKA OIL & GAS CONSERVATION COMbIISSION B.O.P.E. Inspection Report .~'r,. 7',oo ?,re, n, Inspector Operator Well .. ~- ~_(~ Location: Sec d~ Drilling Contractor Date Wel 1 Representative Permit # % ~/~%~Cas lng Set Rig ~ ~ Representativ~ Location, General Well Sign L.~.'.!~r:-... General Housekeeping Reserve pit Rig BOPE Stack Annular Preventer Pipe Rams ~ ~V- Blind Rams Choke Line Valves%~'~-- H.C.R. Valve ~ Kill Line Valvesq-~d/~ Check Valve Test Pres'.sure § ~ Ooc~ ACCUMULATOR SYSTEM Full Charge Pressure '~?D~ .~ psig - pressure After Closure I~::~O psig 200 psig Above Precharge Attained: ,min ~.~ sec Full Charge Pressure Attained: 7_ min I~_-sec N2 )~,~iil~D.~PO, t~l?_~psi9 ~ ' ! I Controls: Master ~ ~' Remote ~-_ Blinds switch cover~ Kelly and Floor Safety Valves Kel ly.~'I Test Pressure Upper Lower Kelly.~ [ Test Pressure Bal 1 Type Ins ide BOP Choke Manifold No. Valves ~_. Test Pressure Test Pressure I Test Pressure No. flanges I~ Adjustable Chokes Hydrauically operated choke. ~. Test Results: Failures. ~m~4~ Test Time ~ hrs. Repair or Replacement of failed equipment to be made within days and Inspector/Commission office notified. Remarks: C~t, MA~, Distribution orig.' - AO&GCC · .cc - Operator cc - Supervisor Inspector SOHIO ALASKA PETROLEUM COMPANY Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99510 Attn: Mr. C. V. Chatterton March 2, 1984 - { I 3111 "C" Sl]REETcoMM ANCHORAGE' !A -tzA. S~s MAIL: POUCH.6-~I~ T~"<~3 .__~ -~ G~OL ! i FIt Gentlemen: In accordance with the Prudhoe Bay Field Rules and Sohio's policy for drilling the first well on a new pad and/or new area, a 20" Hydril and diverter system was used when drilling the surface hole on X-26 (24-06-10-14). We did not experience any surface gas during the drilling of the 17 1/2" hole on Well X-26 and believe it unnecessary to continue the use of the 20" Hydril and diverter system on Pad X. We, therefore, request that Rule 4 (b) of Conservation Order No. 145 be waived for the remainder of X-Pad wells. RHR: JA~: ckg 3284 Yours very.truly, R. H. Reiley District Drilling Engineer cc: X-Pad/Well File K. W. Kolthoff February 27, 1984 Mr. R. H. Re!ley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AlaSka 99502 Prudhoe Bay Unit X-26 Sohio Alaska Petroleum Company Permit No. 84-30 Sur. Loc. ~00'NSL, 617'%~EL, Sec, 6, T10M, P~4E, U~' · Btmhole Loc. 733'MML, Dear Mr. Rei!ey: Enclosed i~ the approved application for pemit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core Ks required. Samples of well cuttings and a mud log are not required. A continuous directional s~ey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digit!zed log information shall be submitted on all logs for copying e~cept experimental log~, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classJ, fied as important, for the spawning-or migration of anadromous fish. Operations in these areas are ~ubJeet to A~q 16.05.870 and the regulations promulgated thereunder (Title Alaska Administrative Code).' Prior to commencingop~ratlon~..~ may be contacted by the Mabitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is proh~.bited by AS 46, Chapter 3, Article 7 and the reg~!ations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the 4 Federal Water Pol!~tz~n Control Act, as amended. Prior %o commencing operations you may be contacte~ by a representative of the Department of Environmental Consmrvation. To aid us in scheduling field work, pleame motifv this office 24 hours prior to commencing ~n~tal!at~on of the blowout prevention Mr, R. !t. Rellev-- Prudhoe Bay Unik ~ February ~ , ~ ~.7 984 equipment so that ~ r~pre~ntativ~ of th~ Cor~mission ~y be or, sent to witness temting of the equipment before th~ ~urfaee ca~ing ~hoe i~ drilled. I~ere a divert~r sy~te~ i~ required, please also notify this office 24 hours prior to eommenein~ ~qu~pment installation so that the Commission may witn~ms testing before drilling below the shoe of the conductor pipe. In the event of muspen~ion or abando~nt, please give thi~ ... o~ot~.ication ~o that .we may hawe a office adequate advance n ~ ...... witnes~ present. Very truly yours, C. V. ChattertOn Chaiman of ' Alaska 0tl and Gas Conservation Comigsio~ be cc: D~partm~nt of Fish & Game, i!ahltat Section w/o encl. D~partment of Environmental Conservation w/o ~ncl. SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 February 23, 1984 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage', Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: W~T'.T'.. X-26 (24-06-10-14) PBU Enclosed are the follcx~g documents, in triplicate, along with our check for $100 to cover the penmit filing fee. 1. Application for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram & Diverter System Detail; 4. Surveyor's plat showing well location; 5. Directional map. If you'have any questions, please call Ted Stagg at 564-5173. Yours very truly, · ~er mcr Well File #17 (23.1) ].984 Cons. Commission STATE OF ALASKA ALASKA"b-~L AND GAS CONSERVATION Co~'MISSION PERMIT TO DRILL 20 AAC 25.OO5 la. Type of work. DRILL [] REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OIL E~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC L~ SINGLE ZONE E~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 200' NSL, 617' WEL, Sec. 06, T10N, R14E, UPM At top of proposed producing interval (~c~'et) 700' NSL, 2000' 5~L, Sec. 06, TZON, R14E, UPM At total depth 733' NSL. 1841' EWLo Sec. 06: T10N. R14E. UDS~ 5. Elevation in fe~t (indicat~ KB, DF'etc.) [ 6. L~as~ d~signati~n and serial no. Est. KBE = 75' AMSL ADL 28313 9. Unit or lease name Prudhoe Bay Unit 10. Well number X-26 (24-06-10-14) PBU 11. Field and pool Prudhoe 0il Pool 12, Bond information (see 20 AAC 25,025) Type Blaz~et Surety and/or number Safeoo Ins. 2975387 Amount $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed NW of Deadhorse- 10 miles East of ADL 47472 - 2000 feet NW well X-5 -- 1450 feet 16, Proposed depth (MD & TVD) 9784' MD - 9242' TVD feet 17. Number of acres in lease 2501 18. Approximate spud date March 1, 1984 3330 psig@~ Surface 4390 __psig@ 8800 ft. ];iJ~(TVD) 19. If deviated (see 20 AAC 25.050) 23° 49 ' 120. Anticipated pressures KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE I (see 20 AAC 25'035 (c) (2) i21 Proposed Casing, Liner and Cementing Program SIZE SETTING DEPTH QUANTITY OF CEMENT i Hole Casing 36 I 20x30 17½ 113 3/8 i ~ 12 ~ I 9 5/8 8½ I! 7 CASING AND LINER Weight Grade [ Coupling Insulat :ed Conductor 72# L-80 ~ Butt. 47# L-80 ~ Butt. / 26# L-80 ! IJ4S Length 80 2650 9.137 867 MD TOP TVD Surface Surface Surface 8917 18449 MD BOTTOM TVD 110 110 80 ~1 26 80 2'6 9167I 8678 I 9784 9242 (include stage data) 8 cu.yds, concrete 3720 cu.ft. Permafros- 2082 cu.ft. Class G; 130 cu. ft. Permafros' 26 7 cu. ft. Class G w' I I 22. Describe proposed program: 18% sal~ See attached proposed drilling and completion program. As shown on the attached directional plat, we are aware of the potential intersection problems which can result from the drilling of this well. If during actual drilling operations, one of these intersections is approached within hazardous proximity, the well to be intersected will be shut-in. ~ ~ C ~ i~~ ~ ~ F E B 2 - II -C Lth Ai3.sk-a Oi! & Gas Cons, CommJssio,~ 23. I he~;eby certify that the foregoing is true and correct to the best of my knowledge ¥ . ; District Drilling Engineer SIGNED i TITLE The space below for Commission use ~.. ~. ~.L.I,~ ~ CONDITIONS OF APPROVAL DATE Samples required []YES eNO Permit number APPROVED BY Form 10-401 Mud log required i--]YES Approval date /-~2~ 27/~84~ Directional Survey required I APl number ~ES •NO I 50--O Z ~ -7¢1 SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE February 27, 1984 by order of the Commission Submit in triplicate PROPOSED DRILLING AND CO.'.:PLETION PRIAM WELL X-26 (24-06-10-14 ]~BU Install and cement 80' of 20" x 30" insulated conductor to surface. Install 20" diverter. Drill 17 1/2" bole to 2700' TVD and cement 13 3/8" 72~ L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. ~-~axim~un possible bottombole pressure is 4390 psi at 8800' q%/Dss based on original reservoir press~re, l.~aximum possible surface pressure is 3330 psi based on a gas col~nmn to surface from 9600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to +100' TVD above the Sag River Sandstone. Run 9 5/8" 47~ L-80 Buttress casing to within 5' of 12 1/4" TD and cement in two stages: first stage using Class G cement around the 9 5/8" shoe and a second stage using Arctic Pack followed by 130 cu. ft. pe~-mafrost cement dis- placed through a D.V. packer collar set 80' above the 13 3/8" shoe. Directionally drill 8 1/2" hole to T.D. Run 7" liner from T.D. to 250' inside 9 5/8" casing shoe and cement using Class G cement with 18% salt. Clean out to 7" float equipment. Change over t° 9.6 ppg.i NaC1 completion fluid. Test casing and lap to 3000 psi. ~Run-CBL. Run 9 5/8" production packer and slidin~ sleeve on-~nternal plastic coated tubing. Set packer +50' above top of liner. A subsurface safety valve with dual control lines will be placed +50' below base of p~rmafrost, Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Suspend well for perforation subsequent to rig release. Tubing Size: 4 1/2" 12.6# L-80 AB-mod. Buttress IPC B.O.P. 13 C;TACK CONFIGUR/~TION i ii · ii i j , 5/8" TRIPLE RAM STACK 5000 PSi WP ii ii DRILLING ,I ANNULAR PREVENTER I I I t PIPE RAMS BLIND RAMS 2" KILL LINE CHECK GATE GATE DRILLING SPOOL PIPE RAMS 4" CHOKE LINE GATE 10 3/4" Hydraulic operated Butterfly ~ralve opens when Annular Preventer closes. 10" DIVERTER GROUND LEVEL 12" MAX. F DRILLING RISER 20" 2000 PSI WP ANNULAR PREVENTOR DRILLING SPOOL 20" CONDUCTOR PIPE , DIVERTER SYSTEM DETAIL DRILL. DEPT. April 1982 NOTE: DIVERTER LINE HAS TWO DIRECTION DISCHARGE CAPABILITY AFTER LEAVING RIG SUB-BASES. · ~_~ SURFACE HOLE. DIVE_r~-R sYST~>.~ Two lines venting 90° apart 10 3/4" manual butterfly valves ~ 10 3/4" 55~ Buttress 10-3/4" Hydraulic operated J~~Butterfly valve ' 1. A/1 pipe connections 150~ ~SI Flanges or' welded connections. 2. ~%snual 10 3/4" butterfly raj. yes, safety wired in omen position at diver~er !ne tee~ ' C4 CA. ! $0 . _ I0 20 50 40 ~X-17(Prooosed) X-16 LAT. 70°i4' 37.77'' LO~G.:i48~39' 25.29" _ X: 666~g33 Y: 5,940}563 ~EAST CONO. ~ L 0 NS.= 148~9' [9.22" ~X= 666,~8 Y=5,939,890 8 PORTION Of T. I0 N., R.13 E. & R. 14 E., U.M. SCALE: t"=I/2MILE CERTIFICATE OF SURVEYOR ~ hereOy certify that I am properly registered to ¢.,cc~ce :and surveying ~n the State of Alaska and that this plat ,e;-esen+s a iocation surveyof the weJipad shown and the wells t~ereo~. This survey was made by me or under my supervision 3nd ti! d~men§ions and other details are correct. Bottom hole ':.3cations o, re furnished by others. Date SURVEYOR ~ZV~S~D ~ELL NUmBERS,ADDED PROPOSED X-2G BHL 8 X-23 SURF. LOG ~ 2/22/8¢ ;EY'SED =~C 3E'~-L .~ 2/17/84 RE¥~SED ~ELL NUmBERS,PAD DE~AIL ~T~ I/ 13/82 T. ION. X-15 EAST CO ,j. SUMP WELLS I PAD DETAIL SCALE· 1":.300' GRID 77~ PAD "X" EXTENSION Located in PROTRACTED SECTIONS §~6~7~8~T. ION.!R.I~ E.~U.M.~ ALASKA Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by EM. LINDSEY & ASSOC. LAND t& HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4-081 Anchorage A- ~ZOS9-8~ FOR PROPO$£D L~LL x-2~ ¢L0~£~? APPHOACH WELL i~NT /FROFOgE~, T~u ~EPnR? TUD -~EPRRT X-3 1,3 e.e bo~ 9.~ t033,5 P,4Ia~a ~-6 4930,4 7~7.2 4888,P 147g,1 ~42,4 X-7 1,4 ~.a ~.~ ~.g 76q.3 R4SS~ ~462~ ~46Be9 X-t~ 55~.5 979,~ R471~ X-ii a4T3g~ X-t3 34~3.e a5.9 Y~.e 4~.4 ?54.t X-t4 3130,1 2~.4 3e9~.6 i5,4 ?98,9 X-17 ~70G,6 X-lg 34g~.G i04,~ 3496,0 BB4,~ 359,4 X-lO 3679,1 16,4 31~7.5 685,3 54B,8 TH~ UELL UHIC~ COr~S CL0$£~T TO THF PRCtP05ED UELT. L~RT1C~L INTERSECTION 34t~&,8 82.i 4773,4 949.5 i367,4 ~ELL !DEH? /PROPO~EE, /HEARBY\ CLO$£ST ~4iE~ X-$ 53~6.9 9u~.~ 5476.~ 1487.5 438,9 x-7 ~,, e,e e.e e.e 764,3 A46?ee x-to X-Il ~TGO.D ~-1~ D57~,6 t3~,~ ~g,? 941.4 ~45.4 x-Ig THE UZLL ~.~IC~ C~r~5 C;.Og;gT TO THE PROPOSED TUD DEPART TUD DEPART 347~,i !et,? 42e3.e 97~.! I.IELL- X,.,.21 (Z~.,OB-10,.,,14! OIIIiOII¢ITOiI,,-.,I~ I"I~TIN " ~;. I/t/ELL . ~1 I:llxl '.,J t I:'W. :';' ~" "': '~"'~" .,' · : ¥'" '~.: i'jJ~ ":. .... , c'; ~ ,, , ,,, , , L..) Ir''' -- , -'", ~ ", / ^/ ~ , ~11 I i i .... ,, , ,, ., 2 ~,00 2 ~.00 Z :300 I 100 ! i00 1 ¢00 1 gl · l 10 1 R 1 IE S :CT I )N=B , SNL =S08 1', 1~ :L=B ?' , , · , , , , , ! ,, ,, , , CHECK LIST FOR NEW WELL PERMITS : ITEM APPROVE .DATE (1) Fee ' (2) Loc qthru 8) .. · , 2. Is 3. Is 4. Is 5. Is 6. Is 7. Is ,(8) (3) Admin ~~'--~- L"%,3-"~ 9. ~.~ ,~,ru 11) 10. (10 and 11) _~ (12 thru 20)' 13. 14. 15. 16. 17. 18. 19. 20. (5) BOPE ,~~.,. ,~'-,,~'~" f4/ 21. (21 thru 24) 22' 23. 24. 25. well to be located in a defined pool ...... · ..... ~ ..... · well located proper distance from property line ...... well located proper distance from other wells ........ sufficient undedicated acreage available in this pool well'to be deviated ·and is'well bore plat included ... operator the only affected· party ..................... Can permit be approved before ten-day wait ....................... Lease & Well No. YES' NO · e · e~ Does operator have a bond in force .......................... ' ....... ati d ed d ' Is a conserv on or er ne e ....................................... Is administrative approval needed ...... ' ............................ ., Is conductor string provided ...' ..................................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in Surface and intermediate or production strings Will cement cover all known productive horizons .................... Will surface casing protect fresh.water zones .......... Will all casing give adequate safety in collapse, tension and burst~. Is this'well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ................................ ~ Are necessary diagrams of diverter a~ ~6~ ~qulpment attached . . Does BOPE have sufficient pressure rating - Test to ~OO~ psig ...~_ .,. Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements ............................................. ~ Additional Remarks: 0 ~-~ ~0 Geolo · Engi e in · - g~' ~,~.!,_F ~' rev: '12/08/83 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effod has been made to chronologically organize this category of information. ~ATE,.Of: DIR:ECT DIGITAL LOGGING CO'MPUTER PROCESSED ANALYSIS Company SOHIO ALASKA PETROLEUM CO. ~:--- '- : :: ~u: : : .:: :'-- :--c.~ zz_:.~itc: e ii :! : ' :: ,,~,i,,i~_..-~,,',',,,.;,,,,' ',,,',.~',', '.: : "9 .- :::_ : ~ : .. ::: ~. :..': ~: . ::.~ Well , X-26 (24-06-18-14) :: ::::.. : :-::::::::::: : : : _£. -::: .:- ::: _: ~::: ~,,~,,,,.,,~,,,, ,~ ~ ::_ ::~'::::: : :~,, __:_. '_ ~ :: : :-:- : .: : ::: ~: ~_ Field PRUDHOE BAY iljllllll, ll, , _ i iL. i1' .L I_ . [~.. J. I,,1: %:: .: ~ . ' . . ,: [ .... , , . County~ NORTH SLOPE S%mtm ALASKA Country USA : _:...: ::::.:.;::_:~.: ::. : .::- : :: ::: :: :,_.: :-::::.. ::..:_. _ :. :::::: :: : CL'IENT F 0 R M 'A T DATA TAPE LOG I NFORMA"T'I ON STANDARD FORM'AT ( L,, I i S, ) W~ll Ho.: SOHIO · Dep'~hs: ~~ g780,_00 ~)atm: 8.~, MAR,~ ~ l~_e4 Tiaa: _1_,~;8.._:__4_7 PM THU, Page I ~_. 1 .... L, I, S, TAPE RECORDS REEL HEADER Service name: &GSF01 Previous reel: Date: 84/03/29 Comments: HEADER RECORDS Origin: Reel name: '252539 Page Continuation #: 01 ************************ TAPE HEADER **** ********************** Service name: &GSF01 Date: 84/03/29 Origin: Previous tape~ Commentz: Tape name~ 252539 Continuation #: 0'1 e'EOF *** FILE HEADER Fil~ name: ~65,F01,001 Maximum lang~h: 10~.~4, HEADER RECORDS File type: LO Previouz {'il~: Pag~ MN£M WN FN COUN STAT CTRY SECT TOWN RANG EKB EDF EGL LHF DHF RUN LCC SON LUN FL LUL WITN DL TLI BLI TCS TLAB BHT MVIS MFST R~ INFORMATION RECORDS CONTENTS SOHIO ALASKA PETROLEUM CO, X-26 (24-06-10-14) PRUDHOE BAY NORTH SLOPE .... ALASKA .... USA iON ..................... 14E ..................... 75.:000 .................. 73,500, ................. 39,900 .................. KBiii~ll Iliitltllllmlm:llliltll~ililIIiillllllllllIillll 0IiIllllllllllII IIIIIlltlllllllilllllIIIIIIlIIIIIllll ......... : .................... ...... , ..... , .... 7611 .................... , ..... ,.,,, ............. NORTH SLOP~ ........... · ........................ NORTH SLOPE ..... ,,,, ........... , ....... , ...... HUPP ....... , .......... ................. CARTER ............................. ....... 9??0.000 ............................................... 9764,008 ............................................... 9239.000 ........................................ ....... 9760.000 ............ , ......... , ............... , ........ 2330,000 ................. ,. ...... ..... , .................. 1132,.000 ............... 191.000 ................ 191,000 ........ , ..... ,, GEL ... FLOWLINE .,, 38.000 ................. 1,970 ......... ,,, ...... 2,380 ................... 63,400 ................. MEAS ........... 2,420 .................. 67.800 ................. MEAS ........... UNIT FT FT FT FT FT FT FT HR HR DEC, F i)EGF CP OHHH OHNH DEGF OHHH DEGF TYPE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CATG 0 0 0 0 0 0 0 0 0 3 3 3 3 0 0 0 0 0 0 0 0 3 3 3 3 2 4 i 1 2 2 2 2 2 2 2 2 2 2 SIZE 40 40 40 20 20 2 3 3 4 4 4 2 2 2 2 2 10 il) 20 20 28 20 4 4 4 4 4 4 4 4 20 4 4 4 4 12 4 4 12 CODE 6.5 65 65 65 65 65 65 65 79 79 65 ,55 65 6~ 6S 6~ Pag~ 'COMMENT RECORDS. This LIS tape was written by ~earhart Industpiez.Wipeline S~rvicez, All curve and tool ,mnemoni'cs used'are those which most closely match Geaphartcurve and.'.,tool mnemonics, ~EARHART TO SCHLUMBERGER MNEM SERVICE ,UNIT MNEM SERVICE,' UNIT DEPTH FEET DEPT FT' TEN DIL MV TENS DIL MV SP DIL/BCS MV SP DILBOS M9 ~R DIL ~API ~R DIL. ~API ILD DIL ONMM ILD DIL OHMM ILM DIL OHMM ILM DIL,. OHNM LL~ DIL ONMM LLSU DIL OHMM DELT DIL/BOS US?F DT DILBCS US/F AMPS DIL?BCS MV AMPL DILBCS MV OILD OIL MMNO CILD DIL MMNO Pag~ DATA ENTRY FORHAT SPEC I F I CAT IONS TYPE SIZE CODE 0 ! (;6 ****************************** ENTRY BLOCK LEGEND' TYPE DESCRIPTION 0 T~pminatop ( no'mora,antpias ) DATA FORMAT SPEC I F I CAT IONS *** DATUM SPECIFICATION BLOCKS **~ MNEM SERVICEi'SER¥iCE ID ORDER API API API API FILE UNIT LOG TYPE CLASS MOD # DEPT TENS ~P ~R ILD ILM LLSU DT AMPL ClLD DIL D ILBCS ' DIL DIL DIL DIL D ILBCS 'F D ILBCS ~ DIL 2525~9FT' 25~539 NV ~5253g ~API 25253~ OHMM 252539 ONMM 25~539 OHMM 252539 US?F 252539 NV 252539'MMHO PRC # SIZE LVL SMPL 0 0 0 0 0 4 0 1 7 0 0 0 0 4 0 0 1 0 0 0 4 0 7 31 0 0 0 4 0 7 12 46 0 0 4 0 7 t2 44 0 0 4 0 7 22 8 0 0 4 0 0 52 32 0 0 4 O 0 53 3 0 0 4 0 7 68 46 0 0 4 0 1 RC ~8 68 68 68 68 ,68 68 68 PROCESS INDICATORS 000800 000 O0 000000 O0000O 000000 000000 000000 000000 000000 000000 000000 000000 000000 O.OOOO0 000000 000000 000000 000000 R oooo 8oooo 0000 0000 000000 000000 000000 000000 000000 OO:O000 000000 000000 Pag~ DATA RECORDS Page 8 DEPT TENS SP ' ~R I LD I L'H LL8U DT AHPL CILD ~780. OOO ~00'I , 000 O, O00 O, 000 ~,541 5,164 7.~8 O, 000 .~, 1 O0 39~. 9680,000 3528,000 7,000 22,500 2,52:3 3,334 7,762 84,1 00 194.300 396.278 "3580,000 3474,000 13,.300 16,300 11,803 17,378 28,6,42 90,100 218,300 84,7'23 9480. 000 3430. 000 -I ,200 15,900 17;783 1=5,922 20,045 91 , 00.0 213,1 O0 56,234 9.,80,000 .3435,000 44,600 86,200 10,093 9,247 20,27'7 74,200 188,200 99. 083 9280,000 3381 , 000 58. 200 1 03,1 O0 1,950 2,506 4,519 1 03,300 183.200 512,861 FILE TRAILER **** Fil~ nam~ &GSF01.001 Maximum length: !024. Servic~ inam~: V~rzion #: File type: LO Next ~ile: Pag~ FILE HEADER Fil~ name: &GSF01.002 Maximum length: 1024, HEADER RECORDS S~rvic~ name: ¥~rzion'#: File type~ LO Previou~ ~ile: Page 10 MNEM CN WN FN ¢OUN STAT CTRY SECT TOWN RANG EKB EDF EGL LMF RUN SON LUN FL LUL ENGI WITN DL TLI BLI TC8 TLAB BHT MRT MT MVIS RM RMF MFST MFSS RMC HCST MCSS INFORMATI:ON RECORDS CONTENTS SOHIO ALASKA PETROLEUM CO. X-26 , ( 24- 06- I O- 14 ) PRUDHOE BAY NORTH 8LOPE .... ~ ..,,, .... ALASKA ..... , ...... USA . ,.,, ........ iON .................... ......... 14E .... , .............. ,.. .... ,... 75:000 t lllll$11'lll#11$1ll ?~ ~00 39 900 I iiiiii1111111111¢1 Iiii1111 SL.,..,,,,..,,,.,,,,,.,, KB,.,,,,,,,,,,,,,,,,,,,, 252539 . . , ............ · ..... , . .. 7611 .............. ,, ..... NORTH ,LOP~ ............ NORTH SLOPE ', ....... ~ ...., HUPP ............ CARTER ,,,, ........ 9770000 9764 000 9239 O00 i IWllllll. Jlllii$1 JlJll$#l 9?60 000 I Illllliillllll$11 illlllll 2330 000 I llllllllllllltll Illlllll 1132'000~ I lllllllilllllllll 191.000 ......................... 191.000 .................... , .... ~EL ............ FLOWLINE ...... , ..... 38'000 I Illllllll$111lllll alliillll 1,970 ........................... 2. 380 ........................... 63.400 ......... , ................. MEAS .................... 2.420 ............................ 67.800 ........................... MEAS ..................... ir m I il s il I Ii ii ii ii, ill e il I i$ tiii Iii iiIi III I irI i i II' I ~I I iII I I JI I I I Ir # II Ii I Il' IiIi I if ~:# I Ii I I~:r ~ IL I II t iIiII II III I ij IiI ;II tir s I IL II Ii I il ii1 lB il I . Iii i. I Il I !1 I Il I/II ILIi I II II aIIII Ir i II * iI l~ II ir i I~ I s a t. IIIl! ii ii, I IL II Il II $I tIIII I II t IIIrI II, I. IIL I I I t11~r I IL il I I I~ IIrI II I I II · IIIIrtIII· Ir II Ii I II I I1. III I . I~ ILI ~IiII I II I I. I Il III SI II I' .I Ir !I ~' I il II I It I I I I I Ir II . $ I III I S Iii · I I II IIi I I i1 Ir I ·I I I Ir II Il I~ I UNIT TYPE' CATG SIZE CODE 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 2 65 0 0 3 65 0 0 3 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 0 3 2 65 0 3 2 65 0 3 2 65 0 O 2 79 0 0 2 79 0 0 10 65 0 0 10 65 0 0 20 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 FT 0 3 4 68 HR 0 2 4 68 HR 0 4 4 68 DEGF 0 1 4 68 DEGF 0 1 4 68 0 2 20 65 0 2 20 65 CP 0 2 4 68 OHHM 0 2 4 68 OHHM 0 2 4 68 DEGF 0 2 4 68 O 2 12 65 OHHM 0 2 4 68 DEGF 0 2 4 68 0 2 12 65 Pag~ 11 COMMENT RECORDS Thi~ LIS ~ape was writ%en by Gearhart Industries Wirelin~ Services, All curve and tool mnemonicz,'used are those which most closely match Geaphart"curve and'~tool mnemonics, ~EARHART TO SCHLUMBERGER MNEM SER¥ICE UNIT MNEM SERVICE~ UNIT DEPTH FEET DEPT 'FT' CNDOI CDL/CHS ~ OOL NPHI FDCCNL PU TEH~ CDL?CNS NV TENS FDCCNL MV GR1 CDL?CN$ GAPI GR FDCCNL GAPI ~CAL1 CDL?CNS IN CALI FDCCNL IN YCAL1 CDL?CNS IN CAL2 FDCCNL IN FCDL1 CDLYCHS CPS FFDL FDCCNL CPS NCDL1 CDL?CNS CPS NFDC FDCCNL CPS RHOB~ CDL?CNS G?C3 RHOB FDCCNL G~C3 DRHO1 CDL/CNS G?C3 DRHO FDCCNL G~C3 CNS1 CDL?CNS ~ LI~IE NPHI FDCCNL PU FCNS1 CDL/CNS CPS FCNL FDCCNL CPS NCNS1 CDL?CNS CPS NCNL FDCCNL CPS CNSS1 CDL?CNS ~ SAND NPHI FDCCNL PU CDL1 COMPUTED DPHI Page 12 DATA m*m ENTRY BLOCKS ,ENTRY ***************************** *** ENTRY BLOCK LEGEND, ***************************** TYPE DESCRIPTION 0 T~rmina~or ( no mor~entri~ ) FORMA T SPEC I f I CAT IONS TYPE SIZE CODE 0 1 66 13 DATA FORNAT SPEC I F I CAT IONS DATUM SPEOIFIOATION BLOCKS SERVICE'SERViCE APl API APl, APl FILE MNEM ID ORDER # UNIT"LOC'TYPE CLASS MOD # PRC # SIZE LVL SMPL RC PROCESS INDICATORS DEPT 252539"FT 0 0 0 0 0 NPHI FDCCNL 252539 PU 42 68 TENS FDCCNL 252539 MV 42 ~0 0 0 1 OR FDOCNL 252539 OAPI 42 31 0 0 CALl FDCCNL 252539 IN 42 28 0 0 I CAL2 FDCCNL 252539 IN 42 0 0 0 1 FFDL FDCCNL 252539 CPS 42 0 0 0 1 NFDC FDCCNL 252539 CPS 42 0 0 0 RHOB FDOCNL 252539 GZC3 42 35 1 0 1 DRNO FDCCNL 252539 G/C3, 42 39 0 0 NPHI FDCCNL 252539 PU 42 68 2 8 1 FONL FDCCNL 252539 CPS 42 O 0 0 NCNL FDCCNL 252539 CPS 42 0 0 0 1 NPHI FDCCNL 252539 PU 42 68 3 0 1 DPHI 252539 0 0 0 0 1 4 0 1 ~68 4 0 1 68 4 0 1 68 4 0 1 ,68 4 0 I 4 O I 4 0 1 68 4 0 1 68 4 0 1 4 0 1 68 4 0 I 68 4 0 1 68 4 0 1 4 0 1 000000 000000 00:0000 000000 O0000O 000000 000000 O0000O 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 O000OO 0000'00 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 00000.0 O00'OOO 000000 000000 000000 000000 Pag8 14 DATA RECORDS Pag~ 15 DEPT NPHI TE~$ ~R CALl CAL~ FFDL NFDC RHOB DRHO NPHI FCNL NCNL NPHI DPHI ~780,000 -1,~3 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,000 0,000 4,000 ~0.~0~ 9680,000 16.360 -3,000 27.900 9,020 8,830 358,900 562,900 2,371 ,024 19.360 414,300 389.700 23.360 t6.909 9580,000 19,g67 -13,000 15,600 10,600 'I0,350 458,800 605,600 2,264 ,026 22,960 291,200 323.600 26.960 23.394 9480,000 20,521 -8,000 18,600 9, 030 8,680 415,500 583,400 2,277 , 016 23.51 0 313, :300 339,800 27.51 0 22,606 9:380,000 ! 3,660 -4,000 ~JS, 900 9,09.0 8,930 22'9,6.0.0 501 , 50.0 2,608 , 012 16,650 406,400 346,200 20,6~;0 2,.545 9280. 000 42,113 -3,000 118,900 1 O, 030 9,840 452,600 684. 900 2,385 , ! 16 43. 120 135,800 ~07.300 47. 120 16,06! FILE TRAILER m**m,mmm~m~,mm.~mmmm~mm File name: '&GSFOf,002. Maximum length: !024 TRAILER RECORDS .$arvice nam,c: File'type: LO Version#: NeXt ?il,e: Date: Page 16 EOF FILE HEADER File name; &GSF01,.O03 Maximum length: 1824. HEADER RECORDS Serv i ce '~.name: Ve'rs.~ on '#: D'ate~ File type: LO Previous ¢ile: Pag~ 17 INFORMATION RECORDS MNEN CONTENTS UNIT TYPE~ CATG' SIZE CODE SOHIO ALASKA PETROLEUM X-26 '(24-06-10-14) PRUDHOE BAY NORTH SLOPE , ALASKA , USA , 06 .... , .........,.,,, 1 ON ............ ',. .... 14E ................. 75. 000 .......... · .... 73,. 500 ......... ' ..... 39.900 ....... . , .. .... SL ..... , ............. . I m , :30 .............. 25253,9 ........... , , 7611 ...... , . , , NORTH SLOPE , NORTH SLOPE , HUPP . CARTER , 9770,000 ............. <)764,000 ............ , 9239 .~000 ............. 976 O, 2330,000 ...... , . , , .... I 132.000 ............. 191 ,000 .............. 191 .000, .. ....... · .... GEL , FLOWLINE 38. 000 ............... I ,970 ................ 2.3,80 ........ ........ 63,400 ............... MEAS ......... 2,420 ................ 67,800 ........... .... HEAS ......... ON WN FN COUN STAT CTRY SECT TOWN RANG E,KB EDF EGL PD LMF DMF RUN LCC SON LUN FL LUL ENGI WITN DD DL TLI BLI TCS TLAB BHT HRT MT MVIS RM RM.F MFST MFSS RHC NCST NCSS FT FT FT FT FT FT FT . HR , HR . DEGF . DEGF . , . CP , OH~N , OHHH , DEGF ! . OHNH , OEGF , 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 O 0 20 65 0 0 2 65 0 0 3 65 0 0 3 65 O 3 4 68 0 3 4 68 0 3 4 68 0 3 2 65 0 3 2 65 0 3 2 65 0 0 2 79 0 0 2 79 0 0 1 0 65 0 0 J 0 65 0 0 20 65 0 0 20 65 O 0 20 65 0 0 20 65 0 3, 4 68 0 3 4 68 0 3 4 68 0 3, 4 68 0 2 4 68 0 4 4 68 0 J 4 68 0 I 4 68 0 2 20 65 0 2 20 65 O 2 4 68 O 2 4 68 0 2 4 68 0 2 4 68 0 2 12 65 0 2 4 68 0 2 4 68 0 2 12 65 Page 18 COMMENT RECORDS This LiS:tape was written by G~arhart Industries Wir~line $~rvices, All curve and tool mnemonics'used are those which most closely match Qearhart curve and~.tool mnemonics, GEARHRRT TO SCHLUMBERGER MNEM ~ER¥ICE UNIT MNEM SER¥ICE~ UNIT D~PTH FEET DEPT FT~ TEN2 CDL/CNS M¥ TENS FDCCNL NV GR2 CDL?CN$ GAPI GR FDCCNL GAPI Page_ DATA ENTRY ENTRY BLOCK LEGEND.. TYPE DESCRIPTION 0 Terminator ( no mo~e,'entriez ) FORHAT SPECIFICA TYPE $I~E CODE TIONS ~0 DATA FORMAT ~PEC I F I CAT I :~ DATUM SPECIFICATION BLOCKS :~~:~~~~~~~~ MNEM SERVICE"SER¥ICE API API API API FILE ID ORDER # UNIT LOG TYPE CLASS MOD # DEPT 252539'FT' 0 0 0 0 0 TENS FDCCNL 252539 MY 42 0 0 0 2 GR FDCCNL 252539 GAPI 42 31 0 0 2 PRC # SIZE LYL SMPL RC 4 0 1 68 4 0 1 PROCESS INDICATORS 000000 000000 000000 000000 000000 000000 000000 000~000 000000 Pag~ 21 . DEPT 92~8,000 TENS 11 ,000 0.000 DATA RECORDS Pag= 22 9138.000 0,000 67,300 9038.000 0,000 55.100 8938.000 -1,000 48.300 8838.000 -3.000 47.100 8738.000 -2.00.0 200 -2,000 52.700 $538.000 0.000 50,200 8438,000 0,000 47,300 0,000 1 08,000 8238 000 0,000 1 06. 700 8138 000 -3,000, 49,?00 8038 000 0,000 61 ,700 7938 000 0,000 82,300 7838 000 0,000 76.500 7738 000 0,000 57.300 1.000 52.800 7538.000 3,000 43,400 DATA RECORDS Page_ 23 DEPT TENS GE 743~. 000 O. 000 43,200 7338. 000 -4,000 41. 600 7238,000 1,000 40,100 7138,000 0,000 43.700 7035,000 O, 000 41 .400 6938.000 -2,000 52,000 6838,000 1.00,0 49,800 6738.000 1,000 46,900 6638,000 2.000 40.300 6538.000 -2.000 37.900 6438.000 -2.000 43.400 6338,000 0,00!0 26,000 6238.000 -2.000 34.800 6138.000 -3,000 35,600 6038,000 0,.000 29,800 5938.000 -2,..000 22,300 5838,000 2,00'0 32,?00 5738.000 0.000 22,500 ,DEPT 5638.0OO TENS -2. 000 . DATA RECORDS Pag~ 2~ GR 25.600 5538.000 -1.000 24,600 5438.000 0.000 32,100 5338,00.0 -2,000 22,300 5238.000 -3,000 28,700 5138,000 1 , 00.0 24.600 5038. 000 -3.000 8.700 4938.000 1,000 41 ,800 4838,000 -4,000 27.600 .4738,000 -3,000 31,000 4638.000 0,000 13.700 4.538.000 0,000 19.400 4438,000 -2,00~0 33,300 .4338,000 1,000 38,500 4238.000 1.00'0 35.300 4138. 000 I ,000 34,?00 4038. 000 -2,000 37.800 3938,000 0.000 36,800 3738.000 0,000 35.800 3638.000 -2.000 34.300 3535,000 -2. 000 27,800 3438,000 0,000 23,500 3338,000 0,000 30.000 3238.000 2.000 25.100 3138.000 0.000 31,000 3038. 000 -1 . 00:0 36. 500 '2938.000 -2,00~0 27,300 2838,000 0,000 28.800 2738.000 0.000 26,800 2638.000 0,000 12,500 FILE TRAILER File name: &GSF01.003 Maximum length: 1024 TRAILER RECORDS File type: LO Hex~ ¢i le: Date: Page 2~ ~*'EOF <'*,EOF RILEY'$ DATASHARE (HOUSTON) REEL HEADER: LENGTH: 132 BYTES REEb NAME: RDSH2652 DATE: 84/05/22 SERVICE MANE: DIGITS REEh CONTINUATION NUMBER: PREVIOUS REEL NAME: COMMENTS: TAPE HEADER: bENGTH: !32 BYTES TAPE NAME: !!3B8~01 DATg: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: COMMENTS: EOF b.I.S. WELL$ITE TAPE CONF DB STAT[ OF A[AS~ ( RILEY'$ DATASHARE (~OOSTO~] L.I.S. FILE: I DATA FORMAT SPECIFICATION WELL$ITE T~PE 26. ENTRY BLOCKS: DATUM TYPE NAME SIZE REP ENTRY 4 UP/DOwN FLAG I 66 1 8 FRASE SP~CING 4 73 6 9 FRAME SPaCiNG [;NITS 4 65 IMC~ 16 DATUM ~LOCK SUB-TYPE 1 66 ! 0 TERMINATOR ~, 66 0 SPECIFICATION BLOCKS: DEPT HYD CC5 TEN PP TC ONITS LOG CRV CLS ~OD SIZE SAMP$ REP ~T 0 0 0 0 4 ! 68 ~D 5 71 0 I 4 t 68 ~V 5 ~ 0 1 4 1 68 CC5 5 72 0 1 4 I 68 TgN 5 73 0 1 4 ! 68 ~ 5 74 0 l 4 1 68 P? 5 75 o 1 4 1 68 TC 5 76 0 1 4 1 68 RILEY'S DATASHAR~ FILE: ! L.I.S. WELLSITE TAPE FILE HEADER: LENGTH: 64 BYTES FILE NAME: DIGITS.O0i MAX RECORD LENGTH: 01024 BYTES PREVIOU6 FILE NAME: INFORMATION: LENGTH: 226 BYTES SON : 11338-01 RUN : t.00 UWI : 926500292108500 COUN: 29.00 STAT: 50.00 CTRY: 9~6,00 WN : X-26 (24-06-10-14) FN : PRUDHOE BAY LMF : 75,OO DATE: O- O- 0 L.I,S. WELLSITE TAPE RILEY'S DATASHARE (HOUSTON) FILE: i DEPTH I-DEPT 2-HYD 3-SP 4-CCL 5-TEN 6-MM 7-PP 8-TC 9700.500 9700,500 0.000 0,000 0,000 187.000 0.000 0,000 92.000 9700.000 9700.000 6,500 -1849.008 0.000 219.000 0,000 0.000 92.000 9600.000 9600,000 0.000 -1849,008 257,000 189,000 0,000 0,000 82,000 9515.000 9515.000 0.000 -1848.004 229.000 87,000 0.000 0,000 73.000 FILE TRAILER: LENGTH: 64 BYTES FILL NAME: DIGITS,001 MAX RECORD LENGTH: 01024 BYTES NEXT FILE NAME: TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: 11338-0! DAT£: 00/00/00 SER¥iCE NAME: DIGITS TAPE CONTINUATION NUMBER: ! REEL TRAILER: LENGTH: 132 BYTES REEL NAME: RDSH2652 DATE: S4/05/22 SERVICE NA~E: DIGITS RE~5 CONTINUATION NUMBER: COMMENTS: REEL HEADER: LEN~T~: 132 BYTES REEb NAME: RUSH2660 DATE: 84/05/29 SERVICE NAME: DIGITS RE~6 CONTINUATION NUMBER: PREVIOUS REEL NAME: COMMENTS: TAPE HEADER: 132 BYTES TAPE NAME: 11338-01 DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NA~E: COM~ENT~: IO0'~IDIQ :MMVM M~IM R1LEY'S DATASHARE (HOOSTON) FILE: 2 L.I.S. WELLSITE TAP~ 26- DATA FORMAT SPECIFICATION ENTRY BI~OCKS: TYPE NANE SIZE REP ENTRY 4 ~P/DO~N FLAG 8 FRAME SPACinG 4 73 9 FRAME SPACING U~ITS 4 65 'INCH ~6 DATUM BhOCK SUB-TYPE 0 TERMINATOR ! 66 0 DATU~ SPECIFICATiUN SSOCKS: . CHAN ID UNITS LOG CRV CLS ~OD SIZE SA~PS iREP m~mmm~mmmmm~mmmmmm.mm .mm~mmmmmm mmmm mmmm . m mmmm mm m_ mm~m 1 DEPT FT 0 0 0 0 4 I 68 2 HYD HYD 5 71 0 i 4 1 68 3 SP MV 5 1 0 1 4 1 68 4 CCD CCL 5 72 0 I 4 1 68 5 TEN TEN 5 73 0 i 4 1 68 6 MM MM 5 74 O 1 4 I 68 7 PP PP 5 75 0 1 4 i 68 8 TC TC 5 76 0 ! 4 ~ 68 RILEY'S DATASHAF~E FILE: 2 DEPTH ";'"7;;;~oo ...... ';'~ 8800.000 88 8000,000 80 7200.000 72 6400.000 64 5600.000 4800.000 4000.000 40 3200,000 32 2400.000 24 1600.000 16 800.000 8 0,000 i-DEPT 2-~YD ~";;;o. ..... o~';' o 00,000 0.000 -1854.000 00.000 -!.000 -1850,012 00,000 0,000 -1850,012 00.000 0,000 -!850,012 00,000 0.000 -1849,008 00,000 0.000 -1850.012 00,000 0.000 -1848,004 00.000 0.000 0,000 00,000 O.000 0.000 00,000 0,000 0.000 00,000 0,000 0,000 0,000 0.000 0,000 L.I.S. WELL$IT5~ TAPE 3-SP 4-CCL 5-TEN 6-~1 7-PP 8-TC ......o ;7";oo ..... ~:';;o ...... o:;'~o ..... ;:~; ..... ~:;'~o ..... ;:;'; 73.000 4233.000 4101.000 0.000 7978.000 0,000 4233,000 4102.000 0.000 7978.000 0.000 4232.000 410!.000 0.000 7978.000 120.000 4232,000 4104,000 0,000 7978.000 509.999 4232.000 4103,000 0.000 7978.000 549.000 4232,000 4102,000 0.000 7978.000 553.000 4231.,000 4103.000 0,000 7978.000 0.O00 0.000 0.000 0.000 0,000 0,000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0,000 0.000 0,000 0,000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 FILE TRAILER: LENGTH: 64 BYTES FILE NAME: DIGITS,001 MAX RECORD LENGTH: 01024 BYTES TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: 11338-01 DATE: 00/00/00 SERVICE NA~E: DIGITS TAPE C~NTINIjATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: !32 BYTES TAPE NAME: DATE: 00/00/00 SERVIC~ NAME: DIGITS TAPE CONTINUATION NUMBER: 2 PREVIOUS T~PE NAME: !133~-01 COMMENTS: RILEY'$ DATASHARE (HOUSTON) FILE: 3 FIbE HEADER: bENGTH: 64 FIbE NAM~: DIG ~AX RECORO bEN PREVIOU$ FIbE INFORMATION: DENGTH: 226 SON : 11338-0~ RUN ; 1.0 OWl : 9265002 COON: 29,0 STAT: 50,0 CTRY: 926,0 WN : X-26 (24 FN : FHUDHOE LMF ; 75,0 DATE: O- O- 0 BYTES ITS,O01 GTH: 01024 NAME: BYTES 92108500 0 0 -06-!0-14) BAY 0 BYTES L.I.$, WEbLSITE~ TAPE 26* L.I.S. WELL$ITE TAPE RIDEY'S DATASHAR~ (HOOSTON) FIDE: 3 DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DO~N FLAG 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 16 DATUM SLOCK SUB-TYPE 0 TERMINATOR ~ 66 0 DATU~ SPECIFICATION BLOCKS: CHAN ID UNITS bOG CRV CbS MOD SIZE SAMP$ REP DEPT MT 0 0 0 0 4 1 68 HYD HYD 5 71 0 ! 4 1 68 SP ~V 5 ! 0 ! 4 I 68 CC~ COb 5 72 0 1 4 ! 68 TEN TEN 5 73 0 1 4 1 68 MM ~M 5 74 0 1 4 ! 68 PP PP 5 75 0 ! 4 ~ 68 TC TC 5 76 0 ! 4 I 68 -~ RILEY'S UATASHAR~ (HOUSTON) FILE: 3 L.I.5. WELLSITE TAPE 26-J DEPTH l-ûE;PT 2-HYD 3""SP 4-ccr4 5. .... T r..' f\! .t:.P 6.Mt-l 7"PP S...TC .-------""-----------.--~--.--------_.----.""-.-----""---""_.-----""-------~---""--""-------"----_.-.- '--~ c~ 9600.000 9600,,000 0,,000 0.000 0,,000 0.000 0.000 0.000 0.000 '- 8800.000 H8úO.OOO 0.000 1998.000 194.000 4229.000 4108.000 0.000 6983.000 8000.000 8vOO.OOO 0.000 1998.000 0.000 4229.000 4110.000 0.000 6983.000 7200.000 7200.000 1.000 ...705.000 0.000 4229.000 4113.000 0.000 6983.000 6400.000 6400.000 0.000 ""1419.000 0.000 4229.000 4114.000 0.000 6983.000 5600.000 56ôO.OOQ 0..000 ---1999.008 296.000 4229.000 4113,,000 .00 7978.000 0.0- '-' 4800,,000 4bUO.OOO 0,,000 -1968,,000 509.000 4229.000 4113,,000 0.000 7978.000 4000,,000 4000.000 0.000 ....1860.000 464.000 4229.000 4114.000 0.000 7979.000 3200,,000 3200.000 -2.000 ~1850.012 470.000 4229.000 4116.000 0.000 7978.000 2400.000 2400.000 0.000 ....1850.012 475.000 4229.000 4116..000 0.000 7978.000 1600.000 1600.000 0.000 "1850.012 478.000 4229.000 4116.000 0.000 7978.000 800.000 800.000 0.000 -1850.012 492.000 4229.000 4117.000 0.000 7978.000 0.000 0.000 -1.000 ...1852.008 479.000 4229.000 4116.000 0.000 7978.000 .- FILE TRAILER: LENGTH: 64 BYTES FIL~ NAME: DIGITS.OOl MAX HECORD LENGTH: 01024 BYTES NEXT FILE NAME: -=-. ~--- *************** EuF *************** --~ TAPE TRA IIJEP: LENGTH: 132 BYTES TAPE !'~Ar""r:: OAT&:: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COIIljMENTS: 2 TAPE HEAOF:R: TFNr'l\H-;. 132 BYT~.~.S U-.ß.\3.. _..~t TAP£ NAME:: 01-\ T E : 00 100/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: CtJMt4£N'I'S: 3 ,~- '-~... *************** EOF *************** -~ --,_. - RILEY'$ FILE: (HOUSTON) L.i.S. WELLSITE TAPE FILE HEADER: INFORMATION: LENGTH: 64 BYTES FIL~ NAME: DIGITS.O0! MAX RECORD LENGTH: 01024 BYTES PREVIOUS FILE NAME: LENGTH: 226 BYTES SON : 11338-01 R~N : !,00 ~Wi : 926500292108500 CO~JN: 29,00 STAT: 50.00 CTRY: 926,00 WN : X-26 [24-06-t0-!4) FN : PHUDHOE BAY LMF : 75,00 DATE: O- O- 0 RILEY'S DATASHARE (HOUSTON) FILE: 4 L.I.S, WELLSITE TAPE DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FhAG 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH ~6 DATUM BbOC~ SUB-TYPE 0 TERMINATOR 1 66 0 DATU~ SPECIFICATION BLOCKS: CHAN ID UNITS bOG CRV CLS MOD SIZE SAMPS REP DEPT FT 0 0 0 0 4 ! 68 HYD HYD 5 71 0 I 4 i 68 SP s¥ 5 1 0 ! 4 i 68 CCh CCL 5 72 0 1 4 1 68 TEN TEN 5 73 0 I 4 I 68 MM ~ 5 74 0 I 4 1 68 PP PP 5 75 0 I 4 1 68 TC TC 5 76 0 1 4 I 68 RILEY'S DATASHAR~ {HOUSTON) FILE: 4 L.I,S. WELLSITE TAPE DEPTH i-DEPT 8800,000 8800,000 8000.000 8000.000 720'0.000 7200,000 6400.000 6400.000 5600.000 5600,000 4800.000 4800,000 4000,000 4000.000 3200,000 3200.000 2400.000 2400.000 !600,000 i600,000 800,000 800,000 0.000 0,000 2-!{YD 3'SP 4'CCL ~-~' ~ ~ 6 MM 7-PP 8-TC O. 1,000 -1441,008 694.000 4~80.000 3904.000 0.000 7978,000 -~,000 -1614,000 644.000 4~79,000 3904.000 0.000 7978.000 ~.000 -1648.008 688.000 4~79.000 3904.000 0,000 7978,000 -2.000 -1640,012 669.000 4279,000 3904.000 0.000 7978.000 1,000 -1657.008 677,000 4279.000 3904.000 0.000 7978,000 -i,000 -11~8,000 531.000 4279.000 3959,000 0,~00 7978.000 1.000 -13~0.000 698.000 4279.000 4!42.000 0,000 7978,000 -~.000 -I403.0!2 714,000 4~79,000 4234.000 0.000 7978.000 0,000 -1391,012 694.000 4279.000 4287.000 0.000 7978,000 -2,000 -1418,012 714,000 4279,000 4317.000 0.000 7978,000 0.000 -1431,000 689.000 4279.000 4335.000 0.000 7978.000 -1,000 -1393,008 689.000 4279.000 433~.000 0.000 7978.000 FiLE TRAILER: LENGTH: 64 BYTES F~LE NA~E: DIGITS.O01 ~AX RECORD LENGTH: 0i0~4 BYTES NEXT FILE NAME: TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: !32 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NA~E: DIGITS TAPE CONTIMUATION NUMBER: PREVIOU6 TAPE MA~E: CO~MENTS: EOF RILE¥'$ DATASHAR~ FILE: 5 FILE HEADER: !~ENGTH: 64 BYTES FILE NAME: DIGITS.0Oi MAX RECORD LENGTH: 01024 BYTES PREVIOUS FILE ~ANE: INFORMATION: LENGTH: 226 BYTES 5ON : 11338-0! RUN : 1,00 UWI : 926500292108500 C{]ON: 29.00 STAT: 50.00 CTRY: 926.00 WM : X-26 (24-06-!0-!4) FN : PRUDMDE BAY ~MF : 75.00 DATE: 0- 0- 0 L.I.S. WELLSITE TAPE 26- RILEY'S DATASHAHE FILE: 5 L.I.$. MELLSITE TAPE DATA FORMAT SPECIFICATIuNN~ ENTRY BLOCK6: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG 8 FRAME SPACING 4 73 1920 9 FRAME SPACING ~NITS 4 65 I~CH 16 DATUM BLOCK SUB-TYPE 0 TERMINATOR ~ 66 0 DATUM SPECIFICATION BbOCKS: CHAN ID UNITS DOG CRV CLS ~OD SIZE SA~PS REP I DEPT FT 0 0 0 0 4 1 68 2 HYD H~D 5 71 0 ~ 4 ~. 68 3 SP ~V 5 I 0 1 4 i 68 4 CCh CCL 5 72 0 I 4 I 68 5 TEN TE~ 5 73 0 1 4 ~ 68 6 ~M ~ 5 74 0 ! 4 ~ 68 7 PP PP 5 75 0 1 4 I 68 8 TC TC 5 76 0 ! 4 ! 68 RILEY'S DATASHARE (HOUSTON) FILE: 5 5,I.$. WELLSITE TAPE 26-J DEPTH i-DEPT 2-H 9600.000 9600.000 8800.000 8800.000 8000.000 SO00.O00 7200.000 7200,000 6400.000 6400.000 5600.000 5600.000 4800.000 ~800.000 4000.000 4000,000 3200.000 3200,000 2400.000 2400.000 1600.000 1600.000 800.000 800.000 0.000 0.000 YD 3-SP 4-CCL 5-TEN 6-MM 7-PP 8-TC .mmmmmmmmmm~mmmm. m .mmmmmm~mmmmemmmmm._ .m ~m mm~mem m .m mm.me.mm.~mmmmmm_ 0.000 -1999.008 729.000 4436.000 4180.000 0.000 7978.000 0.000 -1999.008 732.000 4436.000 4180.000 0.000 7978.000 0.000 -1999,008 706,000 4435,000 4]80.000 0.000 7978.000 0.000 -1449,000 654.000 4439.000 4180.000 0,000 7978.000 0.000 -1573,008 633,000 4436.000 4263.000 0.000 7978.000 0,000 -1696,008 667,000 4436,000 4318.891 0,000 7978.000 i.000 -1728,000 656.000 4436.000 4374.000 0,000 7978.000 0,000 -17~6.008 666.000 4436.000 4395,000 0.000 7978,000 0.000 -1762,008 679.000 4436,000 4403.000 0.000 7978.000 0.000 -1752,000 678,000 4435,000 4427.000 0.000 7978.000 1.000 -!750.008 640.000 4435.000 4477.000 0.000 7978.000 0,000 -1761.000 657.000 4435,000 4510.000 0o000 7978.000 1,000 -1751,012 635.000 4434,000 4540.000 0.000 7978.000 FILE TRAILER: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 MhX RECORO LENGTH: 01024 BYTES NEXT FiLE NAME: TAPE TRAIl, ER: LENGTH: 132 BYTES TAP~ NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NA~E: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE ~A~E: COMmeNTS: RILEY'$ DATASHARE (HOUSTON) FILE: 6 L.I,$. WELLSITE TAPE FILE HEADER: INFORMATIgN: bENGT~: 64 BYTES FInE NAME: DIGITS.001 MAX REC(.iRD GENGTH: 01024 BYTES PR~¥iOgS FILE NA~E: hENGTH: 226 BYTES SON : 11338-01 RUN ; 1.00 UWi : 926500292108500 COON: 29,00 STAT: 50,00 CTRY: 926,00 WN : X-26 (24-06-i0-14) FN : PRUDHOM BAY I, MF : 75,00 DATE: O- O- 0 RILE¥'S DATASH^R~ (HOUSTOn) FILE: 6 L.I.S. WELLSITE TAPE 26-J DATA F[]RMAT SP_JCiFICA~fION ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DO~N FLAG ! 66 1 8 FRAME SPACING 4 73 19~0 9 FRAME SPACING UNITS 4 65 INCM ~6 DATUM BSUCK SUB-TYPE ~ 66 1 0 TERMINATOR i 66 0 DATUM SPECIFICATION BbOCKS: CHAN ID UNIT6 LOG CRV CL5 MOD SIZE SANPS REP DEPT FY 0 0 0 0 4 ! 68 HYD HYD 5 71 0 1 4 ! 68 SP ~ 5 i 0 ~ 4 ! 68 CC5 CCh 5 72 0 1 4 ~ 68 TEN TEN 5 73 0 ! 4 ~ 68 MM ~M 5 74 0 1 4 ! 68 PP PP 5 75 0 ! 4 I 68 TC '£C 5 76 0 1 4 ~ 68 RILEY'S DATASHARE (HOUSTON) FILE: 6 b.I.$. EbbSITE TAPE DEPTH I-DEPT 2- 8800.000 8800.000 0 8000.000 8000.000 7200.000 7200.000 6400.000 6400.000 5600.000 5600.000 4800.000 ~800.000 4000.000 4000.000 3200.000 3200.000 2400.000 2400.000 1600.000 1600.000 800.000 800.000 0.000 0.000 HYD 3-SP 4- C C [, 5-TEN 6-M~{ 7 'PP 8 -TC :';; .... -;:;o;- .... ' - "~-';;"--";'~;""'; ........... ;'; ........ - ' 0 . 0 . .000 O. n 0.000 · . .000 .000 .000 0.000 0.000 0.000 0.000 0.000 0.0OO 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 FILE TRAILER: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 NAX RECORD LENGTH: 02024 NEXT FI[,~ NAME: TAPE TRAIhER: LENGTH: 132 ~YTES TAPE mAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: C!]mMENT$: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTiNUATION~ NUMBER: PRKVIOUS TAPE NAME: COM!4ENTS: RILEY'S DATASHARE (HOUSTO{~) FILE: 7 FILE HEADER: INFORMATION: LENGTH: 64 FIt, g NAME: DI SAX RECORD PRgVlOUS FILE LENGTH: 2 SON : 11338 RUN : UWI : 9265 COUN: 2 STAT: 5 CTRX': 92 wN : X-26 FN : PRUDH DATE: 0- 0 BYTES GITS.OOl ~}GTH: 01024 BYTES NAME: 26 BYTES -0! 1,00 O0292108500 9.00 0.00 6.00 (24-06-10-14) OE BAY 5,00 ' 0 L.I.S. WELLSITE TAPE 26- RILEY'S DATAS[IAR5 (HOUSTON) FILE: 7 L.I.S. WELLSITE TAPE DATA FORMAT SPECIFICATION ENTRY B[,OCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FbAG I 66 t 8 FRAME 6PACING 4 73 i920 9 FRAME SPACING UNITS 4 65 INCH 16 DATU~ BLOCK SUB-TYPE I 66 1 0 TERMINATOR 1 66 0 DATUM SPECIFICATION BbOCKS: CHAN ID UNITS 50G CRV CSS MOD SIZE SA~P$ REP DEPT FT 0 0 0 0 4 i 68 HYD H¥O 5 71 0 I 4 I 68 SP ~V 5 I 0 I 4 ! 68 CCh CCh 5 72 0 I 4 I 68 TEN TEN 5 73 0 ! 4 ! 68 MM ~ 5 74 0 I 4 i 68 PP PP 5 75 0 ! 4 1 68 TC TC 5 76 0 i 4 I 68 RILEY'S DATASHARE (HOOSTON] FILE: 7 L,I,S, WELhSITE TAPE 26- DEPT~i 1-DEPT ...... . ............. ;. 4 9440.000 -99 . 8800.000 8800,000 1. 8000.000 8000.000 -2. 7200.000 7200.000 6400.000 ~400.000 -2, 5600.000 5600.000 1, 4800.000 4800,000 -1. 4000.000 4000.000 l. 3200.000 3200.000 -2, 2400.000 2400,000 O, lbO0.O00 1500.000 -2. 800.000 800,000 O. 0.000 0.000 YD 3-SP 4-CCL. 5-TE~ 6-MM 7-PP 8 -TC -; ...... ...... :::::::::::::::::::::::::::::::::: 0 0 0 9 0 , -9 000 -1441,008 694.000 4280.000 3904.000 0.000 7978,000 000 -I614,000 644.000 4279,000 3904.000 0,000 7978,000 000 -1648,008 688.000 4279.000 3904.000 0,000 7978.000 000 -1640,012 669.000 4~79,000 3904,000 0.000 7978,000 000 -1657.008 677.000 4279.000 3904.000 0.000 7978.000 000 -1128,000 531.000 4279,000 3959,000 0.000 7978.000 000 -1320.000 698,000 4279,000 4142,000 0,000 7978.000 000 -1403,0i2 714,000 4279,000 4234.000 0.000 7978.000 000 -t39!,012 694,000 4279.000 4287,000 0,000 7978,000 000 -1418,012 714.000 4279.000 43!7,000 0.000 7978.000 000 -!431.000 689.000 4279.000 4335.000 0,000 7978.000 000 -1393.008 689.000 4279.000 433~.000 0.000 7978.000 f'ILE TRAILER: LENGTH: 64 BYTES FILE NA~E: DIGITS,001 ~A× RECORD LENGTH: 01024 BYTES NE~T FiLE NA~E: TAPE TRAILER: LENGTH: 132 BYTES TAP~ NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NA~E: CONSENTS: TAPE HEADER: LENGTh: 132 BYTES TAPE aANE: DATE: 00/00/00 SERVICE NA~E: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: CO~ENT6: RILEY'S DATASHAR~ FISE: 8 (HOUSTnN) WELLSITE TAPE FILE HEADER: INFORMATIOn: bENGT!t: 64 BYTES FIhE ~A~E: DIGITS.O01 MA~ RECORD LENGTH: 01024 PR~¥iOOS FIL~ NAME: hEMGTH: 226 BYTES $0~ : 11338-01 RUN : 1.00 UWi : 92650029~108500 COUN: 29.00 STAT: 50.00 CTRY: 926.o0 WM : X-26 (24-06-10-14) FN : PRUDHOE BAY bMF : 75.o0 DATE: O- O- 0 BYTES RILEY'S DATASHARE (HOUSTON) FILE: 8 L.I.S. WELLSITE TAPE 26- DATA FORMAT SPMCIFICATION ENTRY BLOCKS: TYPE MAkE SIZE REP ENTRY 4 UP/DO~N F~AG 8 FRAME SPACING 4 73 i920 9 FRAME SPACING UNITS 4 65 INCH 16 DATU~ BLOCK SUB-TYPE 0 TERMINATOR 1 66 0 DATUM SPECIFICATION SHOCKS: ~]D SIZE SAMPS REP CHAM ID UNITS bOG CRV CbS DEPT r'T 0 0 0 0 4 ! 68 HYD HYD 5 7! 0 1 4 % 68 SP ~¥ 5 1 0 I 4 1 68 CCL CC[~ 5 72 0 ! 4 I 68 TEN TEN 5 73 0 1 4 ! 68 M~ ~s 5 74 0 I 4 I 68 PP PP 5 75 0 1 4 I 68 TC TC 5 76 0 I 4 ! 68 RILEY'$ DATASHAR~ FILE: 8 (HOUSTnM) L.I.S. WELLSITE TAPE DEPTH 1- OEPT 2-HYD 3-SP 4-ECL 5-TEN 6-MM 7-PP 8-TC 9280.000 9280. 8800.000 8800. 8000.000 8000. 7200,000 7200, 6400.000 b400. 5600.000 5600. 4800.000 4800, 4000.000 4000. 3200.000 3200. 2400,000 2400, 1600.000 1600. 800.000 800. 0.000 o. 000 1,000 -1661.012 556.898 4296.89! 4005.992 0.000 7978.000 000 -2.000 -!535,012 542.000 4796.891 4007.000 0.000 7978.000 000 0,000 -1500,000 620.000 4296.891 4007.000 0,000 7978.000 000 -2,000 -1021,006 480,000 4298,000 4052,992 0.000 7978,000 000 0.000 -1120.008 646.000 4296.891 4202.000 0.000 7978,000 000 -2.000 -!256.0i2 662.000 4296.891 4261.891 0.000 7978.000 000 0,000 -1270,008 659.000 4296.89! 4316.000 0.000 7978.000 000 -2,000 -1244,0i2 659.898 4296,891 4340,891 0,000 7978.000 000 0.000 -1237.008 610.000 4296,891 4353.000 0,000 7978.000 000 -2.000 -1262.012 63~.000 4296,89t 4366,000 0,000 7978.000 000 0.000 -1246.008 620.000 4298,000 4409,000 0,000 7978.000 000 -2.000 -1241.012 620.000 4P96.891 4411.000 0,000 7978,000 000 0.000 -1246,008 646.000 4~96,89I 4416.000 0,000 7978,000 FILE TRAILER: LENGTH: 64 BYTES FILE NAME: DiGITS,O0! MAX RECORD LENGTH: 01024 BYTES ~EXT FILE NAME: EOF TAPE TRAILER: bEN(;TH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATIOM MUMBE~: PREVIOUS TAPE NAME: C(]MMENTS: RILEY'S DATASHARE (HOOLTON) FILE: 9 FILE HEADER: INFORMATION: LENGTh: 64 SYTES FILE ~AME: DIGITS.O01 a × RECORD LENGTH: 0t024 LENGTM: 226 BYTES SON : 11338-01 ROM : 1.00 UWI : 926500292108500 COON: 29.00 STAT: 50.00 CTR~; 926.00 WN : Z-26 (24-06-10-14) FN ; P~UDHOE BAy bMF : 75.00 D~TE: O- O- 0 WEI, LSITE TAPE RILEY'S DA~.JiAoHAR~c. £HOUSTON) FILE: 9 L,I.S, WELLSITE TAPE DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAM~ SIZE REP ENTRY 4 UP/DOWN FLAG 1 66 S FRAME SPACING 4 73 19~0 9 FRAME SPACING UNITS 4 65 INCH 16 DATUM BbOC~ SUB-TYPE i 66 0 TERMINATO~ I 66 0 DATUM SPECIFICATION BLOCKS: CHAN ID UNITS [,OG CRV CLS MOD SIZE SAMPS REP 2 HYD 3 SP 4 CCL 5' TEN 6 ~4tq 7 PP 8 TC !3EPT FT 0 0 0 0 4 ~ 68 ~D 5 71. 0 ~ 4 ~ 68 CCL 5 72 0 ! 4 1 68 TEN 5 73 0 1 4 I 68 ~q 5 74 0 ~.. 4 1 68 PP 5 '15 0 1 4 1 68 TC ._5 76 0 ~, 4 1 68 RILEY'S DATASHARE (HOUSTON) FILE: 9 WELbSI I ~ TAPF 26, DEPTH 1-DEPT ~- ........ 9 8 . 8800.000 8800.000 0 8000.000 8000.000 7200.000 7200.000 6400.000 6400.000 5600.000 5600.000 4800.000 4800.000 4000.000 4000.000 3200.000 3200.000 2400.000 2400.000 1600.000 1600.000 800.000 BO0.O00 0.000 0.000 .000 -1826.012 570.000 4252.000 4024.992 0.000 7978.000 -2.000 -1270.008 508.000 4258.000 4033.000 0.000 7978.000 1.000 -!484.0i2 632.000 4553.000 4118.000 0.000 7978.000 -5.000 -!646.0!2 655.000 4~54.000 4166.000 0.000 7978.000 1.000 -1684.00~ 678.000 4254.000 4~00.000 0.000 7978.000 0.000 -1706.012 676.000 4~54.000 4~2.000 0.000 7975.000 l,O00 -!695.000 711.000 4253.000 4231,000 0o000 7978.000 -I,000 -1694,012 692.000 4252,000 4242.000 0.000 7975.000 0.000 -1706.012 678.000 ~252.000 4277.000 0.000 7978.000 0.000 -1706.012 686.000 4252.000 4261-,891 0.000 7978.000 0.000 -1703,01~ 718.000 4~52.000 4~66.000 0.000 7978.000 0,000 -1696,008 702.000 4252~000 ~80.000 0.000 7978.000 FILE TRAILER: bENGTM: 64 BYTES FILE NA~E: DIGITS,O01 ~AX RECORD LENGTH: 01024 BYTES NEXT FlbE NAME: TAPE TRAILER: LENGTH: ~.3~ BYTES TAPE NAME: DATE: 00/00/00 SER¥iCE NAME: DIGITS TAPE C~NTINUATION NUMBER: NEXT TA~E NAME: COMMENTS: REEL TRAILER: LENGTH: 132 BYTES REEL NA~E: R!)SH2660 DATE: 84/05/29 SERVICE NA~E: OIGITS REEL CONTINUATION NUMBER: NE~T REEL NAME: COMMENI8: REEL HEADER: LENGTH: 132 BYTES REnU NAME: RDSH2667 DATE: 84/05/30 SEAVICE NAME: DIGITS RE~L CONTINUATION NUMBER: PREVIOUS REEL NAME: C£JMMENTS: TAPE HEADER: hENGTi~: 132 BYTES TAPE NAME: 11338-01 DATE: 00/00/00 SE~'V1CE NAME: DIGITS TAPE CUNTINU~TION NUMBER: I PREVIOUS ~APE NAME: FII~E: 10 FISE HEADER: INFORMATION: (HOUSTDN) LENGTH: 64 BYTES FIbg NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 BYTES pREVIOUS FILE NAME: LENGTH: 226 BYTES SON : 11338-01 RUN : 1,00 UN! : 926500292!08500 COON: 29.00 STAT: 50.00 CTRY: 926.00 WN : X-26 (24-06-10-14) FN : PRODHOE BAY bMF : 75.00 DATE: O- O- 0 5.I.$. WELLSITE TAPE 26- RIL~¥'$ DATASHAR~: (HOUSTON) FIL~:IO L.I.S. WELLSITE TAPE DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG i 66 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH 16 DATUM BLOCK' SUB-TYPE 0 TERMINATOR i 66 0 DATUM SPECIFICATION BLOCKS: CHAN IO UNITS bOG CRV CbS MOD SIZE SAMPS REP OEPT f'T 0 0 0 0 4 ! 68 HYD HYD 5 71 0 i 4 1 68 SP mV 5 1 0 I 4 I 68 CCh CCL 5 72 0 1 4 i 68 TEN TE~ 5 73 0 1 4 1 68 MM M~ 5 74 0 ! 4 ! 68 PP PP 5 75 0 I 4 I 68 TC TC 5 76 0 ~ 4 ! 68 RILEY'S DATASHARg FILE:lO (HOUSTON) wEbLSITE TAPg DEPTH 1-D 9440.000 9 8800.000 8800, 8000.000 8000, 7200,000 7200. 6400,000 6400. 5600.000 5600. 4800,000 4~00, 4000.000 4000, 3200.000 3200. 2400,000 2400, 1600.000 1600. 800,000 800, O,O0O O, E 0 000 000 000 000 000 000 000 000 000 000 000 000 PT 2-HYD 3-SP 4-CCh 5-TE~.] 6-NM 7-PP 8-TC 0 ,0 7 o. 9 !,000 -1461.000 -2.000 -1460.012 1,000 -9i5.000 -1,000 -i037,012 0,000 -I146,000 0.000 -1174.008 0,000 -I!70.000 0.000 -1178,012 -1.000 -1!41,008 0.000 -1!49,004 -1,000 -1148,012 0,000 -!i47.008 587.000 4342,000 4049,000 0,000 7978.000 655.000 4342.000 4050,000 0,000 7978.000 517.000 4342.000 4093.898 0.000 7978.000 693.000 4342.000 4216,000 0,000 7978.000 673,000 4342,000 4277,000 0,000 7978,000 676.000 4342.000 4278.000 0.000 7978.000 668.000 4342,000 430i.000 0.000 7978.000 654,000 4342.000 4307.000 0,000 7978.000 659.898 4342.000 4329.000 0,000 7978.000 658,000 4340.~91 4362.000 0,000 .7978,000 684.000 4340,891 4389,000 0.000 7978,000 659.898 4340.891 4404.000 0,000 7978,000 FILE TRAILER: LENGTh: 64 BYTES Flbg NAME: DIGITS,O01 MAX RECORD LENGTH: 01024 BYTES NEXT FILE NAMe: *************** EOF TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: 11338-01 DATE: 00/00/00 SERVICE NAMEI DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: 11338-01 COMMENTS: RILEY'S DATASHARE FILE:Il (HOOSTON) L.I.5. WELLSITE TAPE FILE HEADE~: INFORMATION: bEN(;TH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 PREVIOUS FIDE NAME: LENGTH: 226 BYTES SON : 11338-01 RUN : 1,00 OWl : 926500292108500 COUN: 29.00 STAT: 50.00 CTR~: 926°00 WN : X-26 (24-06-I0-14) FN : PRiJDHOE BAY BMF : 75,00 DATg: O- O- 0 BYTES RILEY FILE: DATASHARE (HOUSTON) L.I.$. WEbLSITE TAPE 26-~ DATA ENTRY FORMAT SPECIFICATION BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DO~N FLAG 8 FRAME SP~CING 4 73 1920 9 FRAME ~PACING UNITS 4 65 IMCM 16 DATUM ~OC~ SUB-TYPE 0 TERMINATOR 1 66 0 DATUM SPEC!FICATION BLOCKS: CHAM ID UNIT6 hOG CRV CbS POD MIZE SAMPS REP m m 1 DEPT FT 0 0 0 0 4 I 68 2 HYD HYD 5 71 0 I 4 I 68 3 SP ~V 5 I 0 1 4 I 68 4 CC[, CCh 5 72 0 I q i 68 5 TEN TEN 5 73 0 i 4 1 68 6 MM MM 5 74 0 1 4 I 68 7 PP PP 5 75 0 I 4 I 68 8 TC TC 5 76 0 I 4 i 68 RiLEY'S DATASHAPE FILE:ll (HOUSTON) b.I.$. WELLSITE TAPE DEPTH i-DEPT 8800.000 8800,000 8000.000 8000,000 7200,000 7200.000 6400.000 ~400.000 5600.000 5~00,000 4800.000 ~o0.000 4000.000 4000.000 3200.000 3200.000 2400.000 2400,000 1600,000 1600.000 800.000 800.000 0.000 0.000 2-HYD 3-SP 4-CCL 5-TEN 6-MM 7-PP 8-TC ..... ;~;~ .... ;~;~ ......... ~o "' ;~;oo ..... ;-";; ~;'-~,~'- ' .... ~.' 0 0.0 .0 000 !.000 -1549,008 -2,000 -987.000 0.000 -1142.012 -!.000 -1028.0i2 0,000 -1244.012 -~,000 -1090.008 1,000 -!257.000 -2.000 -1125.000 0.000 -1234.008 -1.000 -11!8,0!2 0.000 -1200.000 -2.000 -i130,0!2 640.000 4326.000 4072.000 0.000 7978.000 670.898 4329.000 4070.000 0.000 7978.000 666.000 4326.000 4139.000 0.000 7978.000 680.000 4326.000 4i92.000 0.000 7978.000 7]2.000 4326.000 4249.000 0.000 7978.000 693.000 4326.000 4283.000 0.000 7978.000 679.000 4325.000 4298.000 0,000 7978.000 674.000 4325.000 4309.000 0.000 7978.000 672.000 4325.000 4325.000 0.000 7978.000 686.000 4326.000 4375.000 0.000 7978.000 665.000 4326.000 4395.000 0.000 7978.000 692.000 4326.000 4415,000 0.000 7978.000 FILE TRAILER: BENGTH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORO LENGTH: 01024 BYTES NEXT Fi~E NAME: TAPE TRAILER: BENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVIC~ NAME: DIGITS TAPE CONTINUATION NUMBER: ~E×T TAPE NAME: COMMENTS: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVIC~ NAME: DIGITS 'rAPE CONTINUATION NUNBER: PREVIOUS TAPE NAME: COMMENTS: RILEY'S DATASHAR~ (HOUSTON) FILE:12 L.I.S. FILE HEADER: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 PHEVIOO$ FILE NAME: BYTES INFORMATION: bENGTH: SON : 11338- RUN : UWi : 92650 COUN: 29 STAT: 50 CTRY: 926 WN : X-26 ( FN : PRUDHO LMF : 75 DATE: O- O- 6 BYTES O1 .00 O292108500 ,00 .00 .00 24-06-10-14) E BAY .00 WELLSITE TAPE 6m RILEY'S DATASHAR. E (HOUSTON) FILE:12 L.I.So WELLSITE TAPE DATA FORMAT SPECIF]iCATiON ENTRY BLOCKS: TYPE NAME SIZE REP ~FNTRY 4 UP/DOWN FbAG i 66 1 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH ~6 DATIJ~ BLOCK SUB-TYPE i 66 ~ 0 TERMINATOR I 66 0 DATUM SPECIFICATION BLOCKS: CHAN ID UNITS bOG CRV CbS MOD SIZE SAMPS REP DEPT FT 0 0 0 0 4 ~ 68 HYD ~YD 5 71 0 !~ 4 I 68 SP MY 5 ! 0 1 4 ~. 68 CCI, CCh 5 72 0 ~ 4 ~ 68 TEN TEN 5 73 0 ~ 4 ~ 68 MM ~M 5 74 0 I 4 1 68 PP PP 5 75 0 I 4 1 ,68 TC TC 5 76 0 I 4 ! 68 RILEY'S DATASHARg FILE:12 (HOUSTON) L.I.S. WELLSITE TAPE DEPTH i-D 8800.000 8800. 8000.000 8000. 7200.000 7200. 6400,000 ~400. 5600.000 5600. 4800.000 4800. 4000,000 4000. ]200.000 3200, 2400.000 2400. 1600.000 1600. 800.000 800. 0.000 O. EPT 2-HYD 3-SP 4-CC5 5-TE~ 6-MM 7-PP 8-TC o';; .... ' o .......... "oo 000 0,000 -1999.008 732,000 4436.000 4180.000 0,000 7978.000 000 0.000 -!999.008 706,000 4435.000 4180.000 0.000 7978,000 000 0,000 -1449.000 654.000 4439.000 4180.000 0.000 7978.000 000 0.000 -1573,008 633.000 4436.000 4263,000 0,000 7978.000 000 0.000 -1696.008 667.000 4436.000 43~8.891 0.000 7978.000 000 1.000 -1728.000 656.000 4436,000 4374.000 0,000 7978.000 000 0,000 -1726.008 666.000 4436,000 4395.000 0.000 7978.000 000 0.000 -1762,008 679.000 4436.000 4403.000 0.000 7978.000 000 0.000 -1752.000 678,000 4435,000 4427,000 0,000 7978.000 000 !,000 -1750,008 640.000 4435.000 4477,000 0.000 7978.000 000 0.000 -1761.000 657.000 4435.000 4510.000 0.000 7978.000 000 1,000 -1751.012 635.000 4434.000 4540.000 0.000 7978.000 FILE TRAILER: LENG~H: 64 BYTES FiLE NAME: DIGITS,U01 ~AX RECORD LENGTH: 01024 BYTES NEXT ~'I~E NAME: TAPE TRAILER: LENGTH: !32 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEX~ TAPE NAME: COMMEN~S: TAPE HEADER: LENGTH: !32 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: COMMENTS: RILEY'S DATASHARE FILE:I3 (HOUST[)N) L.I.S. WELLSITE TAPE FILE HEADER: INFORMATION: LENGTH: 64 BYTES FILE NAME: DIGITS.O0! MAX RECORD LENGTH: 01024 BYTES PRgVIOUS FILE NAME: LENGTH: 226 BYTES SON : 11338-01 R!]N : !.00 UWI : 926500292108500 COUN: 29.00 STAT: 50.00 CTRY: 926.00 ~N : X-26 (24-06-10-14) FN : PRUDHOE BAY LMF : 75.00 I)A£E: O- O- 0 RILEY'S DATASHARE (HOdSTON) 5.1.S. FILE:i3 WELL$ITE TAPE 26' DATA FORMAT SPECiFICATiON ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH 16 DAT{~M BLOCK SUB-TYPE 0 TERMINATOR 1 66 0 DATUM SPECIFICAT'fO~ BLOCKS: CHAN ID UNITS LOG CRV CbS MOD SIZE SAMPS REP ! DEPT MT 0 0 0 0 4 ! 68 2 HYD HYD 5 7t 0 1 4 ! 68 3 SP MU 5 ~ 0 I 4 ~ 68 4 CCL CCh 5 72 0 I 4 I 68 5 TEN TEN 5 73 0 i 4 I 68 6 NM MM 5 74 0 1 4 1 68 7 PP PP 5 75 0 ! 4 I 68 8 TC ~C 5 76 0 1 4 1 ~68 RIEE¥'$ DATASHARE FILE:13 (HOUSTON) WELLSITE TAPE DEPTH 9600.000 880O.OO0 8000,000 72o0,000 6400,000 5600.000 4800.O00 40OO.O00 3200.000 2400.000 1600.000 8OO,000 0.000 1-DEPT 2-HYD 9600,000 0.000 -!999.008 8800.000 0.000 -i999.008 ~000.000 -I,000 -1585.008 '7200.000 0.000 -!759.008 6400,000 0,000 -1883.012 5600.000 0,000 -19!1,000 4800,000 0,000 =1921.008 4000.000 0.000 -1907,012 3200,000 -1.000 -!902.000 2400,000 0.000 -1903,008 1600,000 -2.000 -1888.008 800,000 0,000 -1890,000 0,000 -2.000 -!901.012 684.000 4451.000 4~20,000 0.000 7978.000 889.000 4450.000 4220.000 0.000 7978.000 608,000 4453.000 4226.000 0,000 7978,000 64~,000 445~.000 43ii.000 0.000 7978,000 669.000 4450.000 4355.000 0.000 7978.000 680,000 4450.000 4395,000 0.000 7978.000 655.000 445~,000 442!,000 0,000 7978,000 702.000 4449.000 4435.000 0.000 7978.000 632,000 4450,000 4473.000 0,000 7978.000 653,000 4450.000 4480.000 0.000 7978.000 646,000 4449.000 4512.000 0.000 7978,000 661,000 4450.000 4545,891 0,000 7978.000 666.000 445i,000 4564.000 0,000 7978.000 FIEE TRAILER: LENGTH: 64 BYTES FILE NA~E: DIGITS.O01 ~AX RECORD LENGTH: 01024 BYTES NE~T FibE NA~E: TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAP~ CONTINUATION NUMBER: NEXI TAPE NAME: COmMeNTS: TAPE HEADER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NAME: COMMENTS: RILE¥'S DATASHARf (HOUSTOn) FISE:14 FILE HEADER: INFORMATIO~: LENGTM: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD [jEMGTM: 01024 PREVIOUS FILE MA~E: LENGTM: 226 BYTES SON : 11338-0! UWI : 926500292~08500 COON: 29,00 STAT: 50.00 CTR¥: 926.00 ~N : X-26 (24-06-!0-14) F~ : PRUDHOE BAY 5~F : 75.00 DATE: 0- 0- 0 BYTES L.I.S, WELLSITE TAPE 26 RILEY'S DATASHARE (HOUSION) FILE: 14 L.I.5. WELLSITE T~,PE DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG ! 66 1 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH 16 DATU~ BLOCK SUB-TYPE i 66 i 0 TERMINATOR ! 66 0 DATUM SPECIFICATION BLOCKS: CHAN ID UNITS LOG CRV CbS MOD SIZE SAMPS REP mmmm m m mmmmm.mmmmm.mmmmmmmm~mmm~mmm~mmmmmmmmmmmmmm~ ...... 1 DEBT MT 0 0 0 0 4 1 68 2 HYD HYD 5 71 0 1 4 ]. 68 3 SP NV 5 I 0 I 4 1 68 4 CC[, CCh 5 72 0 i 4 1 68 5 TEN '[EN 5 73 0 1' 4 1 68 6 MN MM 5 74 0 l 4 1 68 7 PP PP 5 75 0 1 4 I 68 8 TC TC 5 76 0 I 4 i 68 RIbE¥'$ OATASHAR~ (hUUSTON) FIbE:14 WELLSITE TAPE DEPTH i-DEPT 9440.000 9440,000 8800,000 ~800.000 8000,000 8000.000 7200.000 7200.000 6400.000 6400.000 5600.000 b~O0.O00 4800.000 4800,000 4000,000 ~000,000 3200.000 3200.000 2400.000 2aO0.O00 1600.000 1600.000 800.000 800.000 0.000 0.000 0.000 -1428.000 1.000 -1549,008 -2.000 -987.000 0,000 -1142,012 -1,000 -1028.012 0.000 -1244.0!2 -2,000 '1090.000 i.000 '!257.000 -2,000 '1125,000 0.000 -1234,008 'i.000 -1118.0i2 0.000 -!~00.000 -2.000 -1130.012 561.000 4326.000 4070.992 640.000 4326.000 4072.000 670.898 4329.000 4070,000 666.000 4326.000 4139,000 600.000 4326.000 4192.000 712.000 4326.000 4249.000 693,000 4326.000 4283.000 679.000 4325.000 4298.000 674,000 43~5.000 4309.000 672,000 43~5.000 43~8.000 6~6,000 4326.000 ~375,000 665.000 4326,000 4395,000 692.000 4326,000 44t5.000 FILE TRAILER: LENGTH: 64 BYTES FILE NAaE: OIGITS,OOI ~AX RECORD LENGTH: 01024 NEXT FILE NAME: BYTES TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: OATE: 00/00/00 SERVICE NAME: DIGITS TAPE CO~TTNU~TION NUMBER: NEXT TAPE NAME: TAPE HEAt)ER: LENGTH: 132 BYTES TAPE NAME: DATE: UO/UO/O0 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PRMVIOO$ TAPE NAME: COMME~5: FI~E:15 DATASHARE (HOUSTON) L.I.S. WELLSITE TAPE FILE HEADER: AINFORi~. liON: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 BYTES PRE~IOUS FILE NAME: L~NGTH: 226 BYTES SON : 11338-01 RUN : 1.00 UWi : 926500292108500 COON: 29.00 STAT: 50.00 CTRE: 926.00 WN : X-26 (24-06-i0-14) Fi~ : PRUDHOE BAY L~F : 75.00 DATE: O- O- 0 RILEY'S DATASHARE (HOUSTON) FIhE:15 DATA FORMAT SPECIFICATION ENTRY BLOCKS: TYPE NAME SIZE REP 8 FRAME SPACING 4 73 9 FRA{~E 6PACING UNITS 4 65 16 D~TUM BLOC~ SUB-TYPE ~. 66 0 TER~INATO~ i 66 DATUM SPECIFICATION ~bOCKS: CHAN ID UNIT6 LOG C~V CLS ~OD SIZE SAMPS DEPT ~ 0 0 0 0 4 HYD HiP 5 71 0 I 4 SP ~V 5 1 0 1 4 1 CC5 CCh 5 72 0 1 4 TEN TEN 5 73 0 1 4 MM ~i~i 5 74 0 1 4 PP PP 5 75 0 i 4 TC TC 5 76 0 1 4 1 RILEY'S DATASi~ARE FILE: 15 WEbLSITE TAPE _ ~E,~ 6-MM 7-PP 8-TC DEPTH i-DEPT 2-HYD 3-SP 4-CCL ~-" '~ . . 9440.000 94~0,000 1.000 -1359.004 669.000 4374.000 4066.000 0,000 7978.000 8800.000 ~800.000 -1.000 -790.006 611.000 ~:377.000 4066.992 0.000 7978.000 8000.000 8000.000 1.000 -941.012 622.000 4374.000 4162.000 0.000~ 7978.000 7200.000 7200.000 -~.000 -1033.008 689.000 4373 000 4~34.000 0.000 7978.000 6400.000 6400.000 0.000 -!067.0!2 659.898 4374.000 4294.000 0.000 7978.000 5600.000 5600.000 -2.000 -1069.008 636.000 4373.000 4321.000 0.000 7978.000 4800.000 4800.000 0.000 -1075.008 668.000 4373.000 4338.000 0.000 7978.000 4000.000 4000.000 -2.000 -1056.000 685.000 4373.000 4348.000 0.000 7978.000 3200.000 3200.000 0.000 -1045.008 685.000 4373.000 4356.000 0.000 7978.000 2400.000 2400.000 -~.000 -1028.012 699.000 4373.000 4383.000 0.000 7978.000 1600.000 1600.000 0.000 -102~.0!~ 695.000 437~.000 4393.000 0.000 7978.000 800.000 800.000 0.000 -1012.006 689.000 4372.000 4394.000 0.000 7978.000 0.000 0.000 0.000 -994.006 676.000 437~.000 4401.000 0.000 7978.000 FILE TRAILER: LENGTH: 64 BYTES FI£,E NAME: DIGITS.O01 MAX RECURD LENGTH: 01024 N~XT FiLE NAME: BYTES TAPE TRAILER: bENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NARE: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: TAPE HEADER: bENGTH: 132 BYTES TAPE NAME: OATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: PREVIOUS TAPE NA~E: CO~MENTS: RILEY'S DATASHARE FILE:f6 FILE HEADER: INFORMATION: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 0~024 BYTES PREVIOUS FILE NAME: LENGTH: 226 BYTES SON : 11338-01 RUN : 1.00 UWI : 926500292108500 COON: 29,00 STAT: 50.00 CTRY: 926,00 WN : X-26 (24-06-10-14) FN : PRUDHOE BAY bMF : 75,00 DATE: O- 0- 0 L.1.S. WELLSITE TAPE RILEY'S FILE:I6 DATASHARE (HOUSI'O~.) 5 I 5 W~:t,LSITE TAPE DATA ENTRY FORMAT SPECIFICATION BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG ! 66 ~ 8 FRAME SPACING 4 73 1920 9 FRAME SPACING UNITS 4 65 INCH 16 DATUM BLOCK SUB-TYPE i 66 1 0 TERMINATOR ! 66 0 DATUM T SPECIFICA.. ION BSi]CKS: CHAN ID UNITS [.,0 CRV CLS MOD SIZE SAMPS ~EP DEPT FT 0 0 0 0 4 I 68 HYD HYO 5 71 0 I 4 1 68 SP ~V 5 i 0 I 4 1 68 CCh CCh 5 72 0 1 4 ! 68 TEN TE~ 5 73 0 1 4 1 68 M~ MM 5 74 0 1 4 1 68 PP DP 5 75 0 1 4 ~ 68 TC TC 5 76 0 i 4 ~ 68 RILEY'S DATASHARE FILE:16 HOUSTON ) L.I.S. WELL$ITE TAPE DEPTH i-DEPT ....... ;;;;7;;; 8800.000 8800,000 8000,000 8000,000 7200.000 7200,000 6400.000 ~400,000 5600.000 5600.000 4800.000 4800,000 4000.000 4000.000 3200.000 3200,000 2400,000 2400.000 1600.000 1600.000 800.000 800.000 0.000 0.000 2-HYD 3-SP 4-CCL 5-TEN 6-~M 7-PP 8-TC ......0.000' ........... -1223.0:2. .... ;;;:;;;'';;;;'-;;. .0 ..... 404;:;;; .......... ;:;;; ;9;;:;""00 0,000 -i214,012 601.000 4325.000 4049,000 0,000 7978.000 0,000 -744,000 429.000 4327.000 4072.000 0.000 7978,000 0.000 -801,0!6 61.9.000 4325,000 4t59,000 0.000 7978.000 0.000 -919,006 681.000 4325.000 4209.000 0,000 7978.000 0.000 -938.012 685,000 4325,000 4260,000 0.000 7978,000 0.000 -953,0!2 661.000 4325,000 4277.000 0.000 7978.000 0,000 -946.006 658.000 4325,000 4259.000 0,000 7978.000 0,000 -981,000 685,000 4325,000 4268.000 O,OOO 7978.000 0,000 -952.006 693.000 4325.000 4284.000 0.000 7978.000 0,000 -940,006 692,000 4325.000 4298,000 0,000 7978,000 0.000 -947,01~ 710.000 4325.000 43!J.000 0.000 7978.000 0.000 -925,006 655.000 4325,000 4336.000 0.000 7978.000 FILE TRAILER: LENGTH: 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 BYTES NEXT FILE NAME: TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICE NAME: DIGITS TAPE CONTINUATION NUMBER: NEXT TAPE NAME: TAPE HEADER: LENGTH: !32 BYTES TAPE NAME: DA~E: 00/00/00 SERVICE NAME: DIGITS ~APE CONTINUATION NUMBER: PREVIOUS TAPE NAME: CO~ENT6: RI~EY'$ DATASHARE FI~E:17 L.I.S. WELLSITE TAPE FILE HEADER: INFORMATION: LENGTH: FILE NAME: MAX R~CORD PREVIOUS FI LENGTH: 22 SON : 11338- RUN : l UWI : 92650 COUN: 29 STAT: 50 CTRY: 926 WN : X-26 ( FN : PR[]DHO LMF : 75 DATE: 0- 0- 64 BYTES DIGITS.00! LENGTH: 0~024 BYTES LE NAME: BYTES I O0 292108500 O0 O0 O0 4-06-10-14) BAY 00 0 RILEY'S DATASHARg (HOOSTON) L.I.S. FILE:17 .~EI, LSITE DATA FORMAT SPECIfflCA. T!ON ENTRY BLOCKS: TYPE NAME SIZE REP ENTRY 4 UP/DOWN FLAG 8 FRAME SPACING 4 73 1920 9 FRAME ~PACiNG UNITS 4 65 INCH 16 DATUM BLOCK SUB-TYPE 0 TERMINATOR ! 66 0 DATUM SPECIFICATION BSOCKS: CHAN ID UNITS LOG CRV CLS MOD SIZE SAMPS REP DEPT FT 0 0 0 0 4 I 68 HYD HYD 5 71 0 1 4 I 68 SP ~V 5 1 0 i 4 I 68 CCD CCh 5 72 0 ! 4 ~ 68 TEN TEN 5 73 0 1 4 ! 68 M~ M~ 5 74 0 1 4 I ~68 PP PP 5 75 0 1 4 ~ 68 TC TC 5 76 0 1 4 1 68 RILE¥'S DATASHAR£ FILE:17 b.I.$. WELLSITE TAPE DEPTH 9280.000 8800,000 8000.000 7200.000 6400.000 56OO.0OO 4800.000 4000,000 3200.000 2400,000 1600,000 800.000 0.000 1-DEPT 2-HYD 9280.000 0.000 -1829,012 8800,000 0,000 -1826.0!2 ~000.000 -2,000 -1270.008 7200,000 1,000 -1484.012 6400.000 -2,000 -!646,012 5600.000 1.000 -1684,008 4800.000 0,000 -1706,0!2 4000,000 1.000 -1695.000 3200.000 -i.000 -1694.012 2400.000 0,000 -1706.012 1600.000 0,000 -1706,012 800.000 0,000 -!703,012 0,000 0,000 -1696.008 3-SP 4'CCL 5-TEN 6-MM 7-PP 8-TC 570.000 4252.000 4024,992 570.000 4252,000 4024,992 508.000 4258.000 4033.000 632.000 4253,000 4ii8.000 655,000 4254,000 4166,000 678,000 4254,000 4200.000 676,000 4254,000 4212.000 711.000 4253,000 4231.000 692.000 4252.000 4242,000 678.000 4252.000 4277.000 686.000 4252.000 426!.891 718.000 4252.000 4266.000 702.000 4252.000 4280,000 0,000 7978.000 0.000 7978.000 0.000 7978.000 0,000 7978.000 0,000 7978.000 0,000 7978,000 0.000, 7978.000 0,000 7978.000 0.000 7978,000 0,000 7978.000 0.000 7978,000 0.000 7978.000 0.000 7978.000 FILE TRAILER: hENGTH; 64 BYTES FILE NAME: DIGITS.O01 MAX RECORD LENGTH: 01024 BYTES NEXT FILE NAME: EOF _ TAPE TRAILER: LENGTH: 132 BYTES TAPE NAME: DATE: 00/00/00 SERVICM NAME: DIGITS TAP~ CONTINUATION NUMBER: NEXT TAPE NAME: COMMENTS: REEL TRAILER: hENGTH: 132 BYTES RMEL NAME: RDSH2667 DATE: S4/05/30 SERVICE NAME: DIGITS REEL CONTINUATION NUMBER: NEXT RE~b NAME: