Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-013
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-013 6.50-029-21577-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11210 11171 8723 none none Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 16" 39 - 119 39 - 119 1640 670 Surface 3873 10-3/4" 39 - 3912 39 - 3794 5210 2480 Intermediate 9501 7-5/8" 34 - 9535 34 - 8308 6890 4790 Production Perforation Depth: Measured depth: 10270 - 10990 feet True vertical depth:8727 - 8718 feet Tubing (size, grade, measured and true vertical depth)32 - 9280 32 - 8103 Packers and SSSV (type, measured and true vertical depth) Liner 1843 9365 - 11208 8171 - 8726 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 5400632137 4546486 0 44572 1824 559 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork David.Bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-4672 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8726 Sundry Number or N/A if C.O. Exempt: 321-206 Junk Packer Printed and Electronic Fracture Stimulation Data 5 Tubing Swap Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028307 PBU 18-08B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 8430 / 10160 / 10570 7500 / 10530 / 11170 NO SSSV 4-1/2" 12.6# 13Cr 4-1/2" HES TNT, 4-1/2" Baker S-3 9164 , 9314 9164 , 9314 8012 , 8130 8012 , 8130 4-1/2" x 3-1/2" x 2-7/8" By Samantha Carlisle at 12:23 pm, Jul 16, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.07.16 09:25:57 -08'00' Bo York DSR-7/19/21MGR30JUL2021 SFD 7/16/2021RBDMS HEW 7/20/2021 ACTIVITYDATE SUMMARY 5/7/2021 T/I/O= 2500/1300/0 Load and Kill Tubing (Pre-RWO) Pumped 2 bbl 60/40 methanol followed by 250 bbls 90* crude down the tubing. FWHPs= 0/1050/0 Slickline in control of well upon departure. IA/OA= OTG 5/7/2021 ***WELL S/I ON ARRIVAL*** (RWO expense) THUNDERBIRD LOADED TUBING W/ 180 BBLS OF CRUDE. SET 2-7/8" XX PLUG IN NIPPLE REDUCER AT 9,315' SLM / 9,347' MD. RAN 2-7/8" CHECK SET TO X-LOCK AT 9,315' SLM (Tool indicates good set). MADE 3 ATTEMPTS TO PULL 45KB STRADDLE PATCH AT 6,687' SLM / 6,720' MD. ONLY ABLE TO GET 31 MINUTES OF TOTAL JARRING ON PATCH (No movement). ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/8/21 WSR*** 5/8/2021 ***CONTINUED FROM 5/7/21 WSR*** (RWO expense) PULL COMPLETE BAKER 45KB x 30.33' STRADDLE PATCH FROM 6,687' SLM / 6,720' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/9/21 WSR*** 5/9/2021 ***CONTINUED FROM 5/8/21 WSR*** (RWO expense) MADE 3 ATTEMPTS TO PULL 45KB STRADDLE PATCH AT 7,799' MD (1:15 minutes of jarring). PARTED WIRE AT COUNTERHEAD 25 MINUTES INTO FOURTH ATTEMPT. ABLE TO RECOVER ALL WIRE & TOOLSTRING FROM PATCH. ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/10/21 WSR*** 5/10/2021 ***CONTINUED FROM 5/9/21 WSR*** (RWO expense) PULL BAKER 45KB STRADDLE PATCH (Missing one element) FROM 7,765' SLM / 7,799' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/11/21 WSR*** 5/11/2021 ***CONTINUED FROM 5/10/21 WSR*** (RWO expense) RAN 3.50" 3 - PRONG WIRE GRAB TO NIPPLE REDUCER AT 9,347' MD (No recovery). PULL BK-DGLV FROM ST #4 (9,248' MD, Pocket to remain empty per program). MADE THREE ATTEMPTS TO EQUALIZE 2-7/8" XX PLUG AT 9,347' MD (Possible element). ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/12/21 WSR*** 5/12/2021 ***CONTINUED FROM 5/11/21 WSR*** (RWO expense) BAIL ~1/3 TO 1/2 OF MISSING 45KB PACKER ELEMENT OFF 2-7/8" XX PLUG AT 9,347' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/13/21 WSR*** 5/13/2021 ***CONTINUED FROM 5/12/21 WSR*** (RWO expense) BAIL REMAINING 45KB PACKER ELEMENT FROM 2-7/8" XX PLUG AT 9,347' MD. RAN 2-7/8" EQ. PRONG TO 2-7/8" XX PLUG AT 9,347' MD (Good ring - psi increase). MADE ONE ATTEMPT W/ 4-1/2" GR TO PULL NIPPLE REDUCER / PLUG BODY AT 9,347' MD. ***LDFN, WELL S/I & SECURED, CONTINUED ON 5/14/21 WSR*** Daily Report of Well Operations PBU 18-08B Daily Report of Well Operations PBU 18-08B 5/14/2021 ***CONTINUED FROM 5/13/21 WSR*** (RWO expense) PULL 4-1/2" x 2-7/8" X-NIPPLE REDUCER W/ 2-7/8" XX PLUG BODY FROM 9,347' MD. BRUSH JEWELRY & DRIFT W/ 4-1/2" BRUSH, 3.50" G-RING TO 45KB LTP AT 9,479' MD. THUNDERBIRD LOADED IA W/ 226 BBLS 1% SKL & 66 BBLS OF DIESEL TO FREEZE PROTECT. THUNDERBIRD LOADED TBG W/ 107 BBLS 1% SKL & 65 BBLS OF DIESEL TO FREEZE PROTECT. SET 4-1/2" PX PLUG BODY (4 - 1/4" x 3/4" slots) W/ FILL EXTENSION & P-PRONG AT 9,347' MD. THUNDERBIRD STAYING ON LOCATION TO CMIT-T x IA TO 2500 PSI & MIT-OA TO 1200 PSI. ***THUNDERBIRD IN CONTROL OF WELL ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** NOTE: THUNDERBIRD PERFORMED SUCCESSFUL CMIT-T x IA TO 3110 PSI. 5/14/2021 T/I/O= 750/1150/0 Assist Slickline (Pre-RWO) Loaded IA w/ 226 bbls of 104* SKL and 66 bbls 40* diesel. Loaded tubing w/ 107 bbls of 104* SKL and 65 bbls of 40* diesel. CMIT-TxIA to 3200 psi ***PASSED***(See log for details) Tags/AFE hung on WV/MV/IA. FWHP= 500/500/0 SV/WV= C SSV/MV= O IA/OA= OTG Well shut in upon departure. 5/15/2021 ***WELL S/I IN ON ARRIVAL*** FIRED STRING SHOT FROM 9259.5' - 9268.5' MD. CUT TUBING WITH 3-5/8" CHEMICAL CUTTER @ 9,268' MD. THE BOTTOM HALF OF THE CHEM CUTTER AND CENTRALIZER WAS LEFT IN HOLE. ***FISH LEFT IN THE HOLE*** 5/15/2021 T/I/O= 750/450/0 Pressure Test OA (Pre-RWO) Pumped 2.1 bbl of 40* diesel to load OA. Pressure tested OA in steps to 1200 psi for 5 mins ***PASSED*** (see log) Observed no leaks or bubbling in cellar/flutes. Tag on OA, AFE sign on MV. FWHP= 750/450/0 SV/WV/SSV= C MV=O IA/OA= OTG Well shut in upon departure. 5/16/2021 T/I/O = 211/187/1. Temp = SI. CMIT-TxIA to 1000 psi FAILED (Post chem cut). No AL. TBG & IA FL @ near surface. Used 4.6 bbls Diesel to pressure T/IA to 1009/986 psi. T/IA decreased 187/186 psi in the 1st 15 min, 123/126 psi in the 2nd 15 min. Failed. On the 2nd attempt Used 0.9 bbls Diesel to pressure T/IA to 1025/1000 psi. T/IA decreased 175/170 psi in the 1st 15 min, 106/108 psi in the 2nd 15 min, 83/85 psi in the 3rd 15 min, and 78/81 psi in the 4th 15 min for a total of 442/444 psi in 1 hr. Established LLR of 1.1 gpm. Bled T/IA to 190/60 psi (1.7 bbls). Hung tags. Final WHPs = 190/60/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:00 5/19/2021 ***WELL S/I ON ARRIVAL***(rwo expense). TAGGED CHEM. CUT FISH @ 9324' SLM W/ 4 1/2 WRP DRFT SET 4 1/2 EVO-TRIEVE MID-ELEMENT @ 9316' SLM (9328' MD) SET 3.59" JUNK CATCHER ONTOP OF EVO @ 9310' SLM (9322' MD) CMIT-IA 3000PSI (passed) BLED TUBING/IA TO 500PSI ***JOB COMPLETE, WELL LEFT S/I*** Daily Report of Well Operations PBU 18-08B 6/1/2021 T/I/O=87/202/0 SI Circ well to KCL (CIRC OUT) Pumped 5 bbls 60/40 followed by 546 bbls 1% KCL down TBG up IA taking returns to 18-07 FL Pumped 100 bbls diesel down TBG and u-tubed 1 hour for TBG and IA FP DSO/WSL notified Tags hung on MV Valve positions=SV WV SSV MV closed CVs OTG Hardline SI FWHP=1194/1178/0 6/5/2021 T/I/O = VAC/VAC/VAC. Temp = SI. WHPs (pre RWO). Wellhouse & flowline disconnected. Rig scaffold installed. Integral installed on OA. SV, WV, SSV = C. MV = LOTO. IA, OA = OTG. 08:30 6/6/2021 T/I/O = 0/0/0. Pre-RWO ND Tree / NU BOP Set 4" H CTS BPV with dry rod. Sting into tubing hanger test void. 0+ psi on test void. Bled to 0 psi. Assist Worley to ND tree. Check for psi on 2 each 1/4" CCL, SSSV = 600 psi, Balance = 500 psi, bleed to 0 psi. Remove tree and THA, cut and cap CCL, clean tubing hanger void. Visually inspect 4-1/2" NSCT tubing hanger lift threads and they look good. Test fit a 4-1/2" NSCT sub into hanger. Good fit. Installed CTS inner plug for BOP test. Functioned tubing hanger LDS. Replaced 3 each LDS. Clean and inspect ring groove, installed new RX-54 on FMC Gen 4 wellhead. Installed 11" 5M x 13-5/8" 5M DSA with new BX-160 on top. Assist Worley with orienting 13-5/8" 5M BOPs per Thunderbird requirements. W orley crew torqued 11" 5M and 13-5/8" 5M connections. RDMO. 6/11/2021 TBird - 1: RD @ Z-31 and move to 18-08. Daylight operation only. Review and edit procedure for RD. Pits and pump were moved last night. Prep floor, scope and lower derrick. Hot Shot truck start moving loads to 18-08. Rd and spot equipment for travel and clean-up location @ Z-31. AAR for RD. Continue to transport equipment from Z pad to DS 18. Spot base beam. Spot Koomey unit. Spot ancillary equipment. ***In Progress*** 6/12/2021 TBird - 1: Daylight operation only. Review and edit procedure for RU & test BOPE. Continue to spot rig & equipment. Continue to spot ancillary equipment. Continue to transport workover equipment from Z pad. Procedural based RU. Rigged up the rig, Spot and RU pump, pits, Chk, kill manifold, and chk and kill lines. Spot change out gen set. RU extension & spot pipe handler. Spot XO rack. Spot pipe racks. Spot air spooler. Spot & RU heaters. Spot & RU BOP test pump & fresh water pup trailer. RU remainder of pump lines & 500bbls return tank. RU intergral on IA. ***In Progress*** 6/13/2021 TBird - 1: Daylight operation only. Continue to rig up. Prepare for BOP test operations. Set up pipe racks & organize new 4.5" tubing to be tallied & drifted. MIsc RU items. Set herculite in pipe LD area and cellar. CanRig training and calibrations. CanRig set up OA and pump pressure transducers. TS removed thread protectors, set up pipe for running order, and tallied pipe. Driller trained crew on basic CanRig set up and operation. Prepare new completion tally. Circulate KCl to test CanRig PVT & alarm system. RU OA CanRig pressure gauge. ***In Progress*** 6/14/2021 TBird - 1: Daylight operation only. Continue to rig up. Install suction pump screen. Perform offline test of BOPE in preparation for AOGCC test. Perform drills w/ crew. Test PVT's. Test gas alarms. Repalce 2 koomey unit bladders. Work on completion tally. Work on AOGCC commitment paperwork. ***In Progress*** Daily Report of Well Operations PBU 18-08B 6/14/2021 ***COST PLACEHOLDER*** Machine costs to build fishing tools for lost chem cutter ticket # HIL2-21-405 6/15/2021 TBird - 1: Daylight operation only. Continue towork on AOGCC commitment paperwork. Stae witnessed BOP test. Pipe rams failed - replace and retest. Breakdown 2-7/8" landing joint. MU new 4-1/2 landing Jt. Complete setting up hole fill pump. Organize completed procedures. Function test constant hole fill system. RU & function test air spooler. Continue to work on procedures. ***In Progress*** 6/16/2021 TBird - 1: Daylight operation only. Vac out pits & fill up w/ fresh hot fluid. Rock out diesel to OT and circ well w/ 50 bbl Baraklean pill followed w/ 425 bbls hot 1% KCL. Clean returns to surface. MU Landing Jt and BOLDS. Hanger pulled free @ 95K. Work up to 150K for 1 hour. 51" of stretch. Stop and set up 200T elevators to replace 75T elevators in order to pull to upper limit of 184K. 200T elevators did not have setting plate installed. YellowJacket Tech installed on location. Grind down bottom guide plate on elevators. RU elevators. Work up/down on tubing. Call out e-line truck. RU e-line unit. ***In Progress*** 6/17/2021 TBird - 1: Continue to RU e-line unit. RIH w/ e-line RCT. Correct to tubing tally. Cut tubing ~3ft below previous cut. Pull 174k, tubing is free. POH & RD e-line. C/O 200T elevators w/ 75T elevators. Start POH w/ 4-1/2" completion spooling. Weekly crew change night and days. Return to work meetings both crews w/ Bo and John. Power tongs failed. Replace and continue OOH. Recovered 60 ss control line bands. RD top sheave/air spooler. Perform D1 well control drill. Continue to LD 4-1/2" tubing. LD 75jts before midnite. ***In Progress*** 6/18/2021 TBird - 1: Continue to LD 4-1/2" tubing. Prep to runcompletion. RU WFD torque turn services. Review procedure for running tbg,, WC Plan, and line up Chk valves per Standing Orders. Set up PVT's, trip tank, and trip sheet. Run 4-1/2" 13Cr VAM TOP completion. Land completion over tubing stub 9251ft. Unable to determine if over the stub based on OS shear pin data. RU to reverse circulate. ***In Progress*** 6/19/2021 T/I/O = 0/0/0. Pull 11" DSA & 13-5/8" BOP's. Set FMC 11" 5M x 4-1/16" 5M THA. Torque THA x TBG Spool flange to 1890 psi. Set 4-1/16" CIW FLS tree & torque THA x MV flange to 553 psi. Wellhead tech tested adapter void. PT tree to 500 psi low and 5000 psi high for 10 minutes, no leaks. Pull 4" CIW H TWC w/ dry-rod. Install lateral piping and wellhead scaffolding. Set well shelter on 6" x 16" timbers and install floor kit, wellhouse backing. Instrument techs installed SVS hydraulic hoses. RDMO. 6/19/2021 TBird - 1: RU to reverse circulate & circ over stub for verification - success. Continue to load out trailers. RD circ iron & LD pups. 83k SOW, 100k PUW . MU & land hanger. RILDS. RD Weatherford torque turn services. Reverse 285 bbls 1% Baracor 100 w/ .1% Oxygon in 125F 1% KCL. Drop ball and rod (1-3/8" Fish Neck OAL 6.9'). Set Packer 3200 psi. MIT-T 3215 psi (PASS) lost 15/5 psi in 15/30 mins. Final pressure 3195 psi. MIT-IA 3200 psi (PASS) 0/0 in 15/30 mins. Final pressure 3200 psi. Bleed off T and to open shear valve in GLM #4. Bleed T and IA to zero. Set 4" H plug. RD and Move to 05-28 ***Job Complete*** Daily Report of Well Operations PBU 18-08B 6/20/2021 ***WELL S/I ON ARRIVAL***(post rwo) PULLED BALL & ROD ASSY FROM RHC @ 9190' MD. PULLED BK-DGLV FROM ST#3 @ 5847' MD. PULLED BEK-DCK SHEAR VLV FROM ST#4 @ 3372' MD. SET BK-LGLV IN STA #4 @ 3,3702'MD SET BK-S/O IN STA #3 @ 5,847' MD PULLED 4 1/2" RHC PLUG BODY FROM 9,190' MD ***CONT WSR ON 6/21/21*** 6/21/2021 ***CONT WSR FROM 6/20/21*** (rwo expense) RAN 9' x 3.0" PUMP BAILER TO TOP OF JUNK CATCHER @ 9,304' SLM (metal marks, no recovery) PULLED 3.59" JUNK CATCHER FROM TOP OF EVO @ 9,306' SLM PULLED 4 1/2" EVOTRIEVE FROM 9,312' SLM MADE MULTIPLE ATTEMPTS TO FISH CHEM CUTTER FROM 9,318' SLM RAN 3.80" MAGNET, UNABLE TO PASS 9,119' SLM MADE 3 RUNS W/ 9' x 3.0" PUMP BAILER TO 9,318' SLM (recovered 3 cups rig debris) RAN 2.50" HYDROSTATIC BAILER TO TOP OF CHEM CUTTER @ 9,318' SLM (no recovery) ***CONT WSR ON 6/22/21*** 6/22/2021 ***CONT WSR FROM 6/21/21*** (rwo expense) FISHED LOWER CHEM CUTTER FROM 9,318' SLM (everything intact) PULLED P-PRONG FROM 4-1/2" PX-PLUG @ 9347' MD. RAN 10' x 2.50" PUMP BAILER TO PLUG BODY @ 9347' MD.(empty) PULLED 4-1/2" PX-PLUG BODY FROM X-NIPPLE @ 9347' MD. ***WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** 7/7/2021 T/I/O = 1320/1450/370. Temp = 90°. Bleed IAP (DP). No AL. IA FL @ 5620' (227' above sta # 3 SO). Bled IAP to OT to 390 psi in 45 min. OAP decreased 140 psi. Monitored for 30 min. IAP & IA FL unchanged, OAP decreased 60 psi. Final WHPs = 1320/390/170. SV = C. WV, SSV, MV = O. IA, OA = OTG. 01:30 7/8/2021 T/I/O = 1320/390/10. Temp = 90°. WHPs (post bleed). IAP unchanged, OAP decreased 160 psi overnight. SV = C. WV, SSV, MV = O. IA, OA = OTG. 00:30 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION Reviewed Bjy: ?/ P.I. Sup" 6 ���� BOPE Test Report for: PRUDHOE BAY UNIT 18-08B Comm Contractor/Rig No.: Hilcorp Thunderbird l ' PTD#: 2120130 ' DATE: 6/15/2021 � Inspector Matt Herrera - Insp Source Operator: Hilcorp North Slope, LLC Operator Rep: Bass/Ross Rig Rep: Parker/Flores Inspector Type Operation: WRKOV Sundry No: Test Pressures: i Rams: Annular: Valves: Type Test: INIT 321-206 i ----- — - - 250/3000. 250/3000 250/3000 TEST DATA MASP: 2470 - Inspection No: bopMFH210616193200 Related Insp No: MISC. INSPECTIONS: MUD SYSTEM: ACCUMULATOR SYSTEM: Upper Kelly 0 P/F Lower Kelly Visual Alarm Time/Pressure P/F Location Gen.: T--- Trip Tank _P . P System Pressure - 3000 P Housekeeping: P Pit Level Indicators P P Pressure After Closure 1700 P PTD On Location P_ _" Flow Indicator P P 200 PSI Attained 20 P Standing Order Posted P _ Meth Gas Detector P P Full Pressure Attained 117 P Well Sign P H2S Gas Detector P P Blind Switch Covers: YES P Drl. Rig P MS Mise NA NA Nitgn. Bottles (avg): 6*2325 _ _ P Hazard Sec. P ACC Misc 0 NA Misc NA FLOOR SAFTY VALVES: BOP STACK: Quantity P/F Upper Kelly 0 NA- Lower Kelly 0 NA Ball Type 1 P - Inside BOP 1 P FSV Misc 0 NA BOP STACK: Quantity Size P/F Stripper 0- __--- NA Annular Preventer 1 13 5/8" P #1 Rams 1 2 7/8x/5 1/2 F #2 Rams I 'Blinds P #3 Rams 0 -- -NA #4 Rams 0 NA #5 Rams 0 ----NA- A#6 #6Rams 0 NA Choke Ln. Valves 1 3 1/8" P HCR Valves 1 " 3 1/8" - P " Kill Line Valves 3 3 1/8" P Check Valve 0 NA BOP Misc 0 NA CHOKE MANIFOLD: Quantity P/F No. Valves I 1 P Manual Chokes -- 2 P Hydraulic Chokes - 0 - NA - CH Misc 0 NA INSIDE REEL VALVES: (Valid for Coil Rigs Only) Quantity P/F Inside Reel Valves -_0 NA _- Number of Failures: 1 -11� Test Results Test Time 4 Remarks: 4 1/2" Test Joint 2 7/8 x 5 1/2 VBR Pipe Rams failed multiple attempts would be changed out and retested prior to startup. All PVT and Gas alarm systems tested with no issues Operator Name:2. Exploratory Development Service 5 Permit to Drill Number:212-013 6.API Number:50-029-21577-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028307 Property Designation (Lease Number):10. 8. PBU 18-08b 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well 5 Operations shutdown Op Shutdown GAS GSTOR WAG SPLUG Abandoned Oil 5 WINJ Exploratory Development 5Stratigraphic Service WDSPL 12. Attachments: PRESENT WELL CONDITION SUMMARY 11210 Effective Depth MD: L-80 11. 5/10/2021 Commission Representative: 15. Suspended Contact Name: David Bjork Contact Email: David.Bjork@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Yes No Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: OtherAlter Casing Pull Tubing Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8726 Effective Depth TVD:Plugs (MD):Junk (MD): Other Stimulate Re-enter Susp Well Suspend Plug for Redrill Perforate Perforate New Pool 9314 / 8130 No SSSV Installed Date: Liner 1843 4-1/2"x3-1/2"x2-7/8"9365 - 11208 8171 - 8726 8430 / 10160 / 1057 7500 / 10530 / 11170 Well Status after proposed work: 16. Verbal Approval: Change Approved Program 39 - 3912 39 - 3794 14. Estimated Date for Commencing Operations: BOP Sketch 39 - 119 6890 Proposal Summary 13. Well Class after proposed work: 4-1/2" Basker S-3 10270 - 10990 8727 - 8718 4-1/2" 12.6# L-80 30 - 9368 11171 8723 none none 39 - 119 670 10-3/4" 7-5/8" Contact Phone:(907)564-4672 Date: 4790 80 164016"Conductor 2480 GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 5 Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 3873 5210 Intermediate 9501 34 - 9535 34 - 8308 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. 4-21-21 55 321-206 By Grace Salazar at 9:36 am, Apr 22, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.04.21 14:56:55 -08'00' Bo York DSR-4/22/21DLB 04/22/2021MGR22APR21 10-404 BOPE test to 3000 psi. Annular to 2500 psi. XYes n Required? Comm 4/23/21 dts 4/22/2021 RBDMS HEW 4/26/2021 RWO 18-08b PTD: 2120130 Well Name: 18-08b API Number: 50029215770200 Current Status: Shut-In Rig: Thunderbird #1 Estimated Start Date: 5/19/2021 Estimated Duration: 4 days Reg.Approval Req’std? 10-403, 404 Date Reg. Approval Rec’vd: N/A Regulatory Contact: Carrie Janowski Permit to Drill Number: 2120130 First Call Engineer: Dave Bjork 907-564-4672 907-440-0331 Second Call Engineer: Ryan Thompson 907-564-5280 907-301-1240 AFE Number: 215-01273 IOR 800 Current Bottom Hole Pressure: 3,350 psi @ 8,800’ TVD 7.4 PPGE | Offset producer 18-14c - 12/19 Max. Anticipated Surface Pressure: 2,470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP: 2,400 psi (Taken on 11/24/14) Min ID: 2.313” ID Nipple reducer @ 9,479’ MD Max Angle: 93 Deg @ 10,989’ Brief Well Summary: 18-08b is a Z1A lateral producer that was CTD sidetracked in 2012 and stayed online until 2015. An LDL Indicated 3 tubing leaks in addition to the two patches. It is not worth patching again. We will now pursue a RWO to replace the L-80 tubing. Objective: Pull the existing 4 ½” L80 tubing out of the well and replace with 4-1/2” 13 chrome tubing. Achieve a passing MIT-IA & MIT-T. Pre RWO work: SL - Pull 45KB patches Pull nipple reducer Secure well with 3.81” PX plug at 9,347’ DHD – MIT OA – 1,200 psi CMIT-TxIA to 3,000-psi after resecuring well, run eline LDL if failing. Cycle LDS’s PPPOT-T to 5,000psi PPPOT-IC to 3,500pdi EL – LDL if necessary Cut tubing @ ~ 9,268’ Circulate well to 8.5 ppg 1% KCL w/ diesel FP on T & IA DHD - Bleed WHP’s to 0 Valve Shop - Set and test TWC Nipple Down Tree and tubing head adapter. Inspect lift threads. NU BOPE configured top down, Annular, 2-7/8” x 5-1/2” VBRs, Blinds and integral flow cross RWO 18-08b PTD: 2120130 Proposed RWO Procedure: 1. MIRU Thunderbird #1 Rig. 2. Test BOPE to 250psi Low/3,000psi High, annular to 250psi Low/2,500psi High (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. A. Perform Test per Thunderbird #1 BOP test procedure. B. Notify AOGCC 24 hrs in advance of BOP test. C. Confirm test pressures per the Sundry Conditions of approval. D. Test the 2-7/8” x 5-1/2” VBR’s with 4 ½” and 2-7/8” test joints. Test the Annular preventer with a 2-7/8” test joint. E. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 3. Pull TWC 4. MU landing joint or spear, BOLDS and pull tubing hanger to the floor. PU weights are expected to be ~130K. Circulate bottoms up. 5. Pull 4 1/2” tubing. 6. Run 4 ½” Chrome tubing with stacker packer completion as detailed on proposed schematic. 7. Land Hanger and reverse in corrosion inhibited 8.5ppg 1% KCl. 8. Drop ball and rod and set packer with 3,500psi pump pressure. 9. Perform MIT-T to 3,000 psi and MIT-IA to 3,000 psi for 30 charted minutes. 10. Shear valve in upper GLM 11. Set TWC 12. Rig down Thunderbird #1. Post rig valve shop work 1. ND BOPE 2. NU tree and tubing head adapter. 3. Test both tree and tubing hanger void to 500psi low/5,000psi high. 4. Pull TWC and freeze protect to ~2,000ft with diesel. Post rig Slickline Work 1. Pull Ball and rod and RHC profile 2. Set GLV’s per GL Engineer 3. RDMO & pop well Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOP Drawing RWO 18-08b PTD: 2120130 Current Wellbore Schematic RWO 18-08b PTD: 2120130 Proposed Wellbore Schematic RWO 18-08b PTD: 2120130 RWO BOPs Baker Hughes PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc. WELL NAME 18-08B FIELD Prudhoe Bay Unit COUNTY North Slope BHI DISTRICT Alaska AUTHORIZED BY Dirk Zeijlemaker EMAIL Dirk zeiilemaker(cilbakerhughes com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. EOA. PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Burka & Barbara Glassmaker 1900 E. Benson Blvd. ,Anchorage, Alaska 99508 2 Co..e.Phillips Alaska Inc. Attn: Ricky Elgarico 1 ATO 1344 .700 G Street Anchoraee, AK 99501 3 Exxon Mobil, Alaska Attn: Lynda M. yaskell and/or Lisa Boggs 13201 C Street, Suite 505 Anchoraee, AK 99503 1 No 212013 31496 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com to acknowledge receipt of this data. LOG TYPE RPM:PNC3D-CO LOG DATE October 13, 2019 TODAYS DATE November 21, 2019 Revision Details: Rev. Requested by: _- FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, chs, PDF, META, SURVEY REPORT Locs CGM, Final Surveys) (Compass) #OF PRINTS *OF COPIES J#OF COPIES #OF COPIES 4 JJ W 41 State of Alaska - AOGCC 1 Atm: Natural Resource, technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 RECEIVED 5'DNR- Division of Oil & Gas *" ',Attn: Garret Brown 1,550 West 7th Avenue, Suite 1100 j Anchorage, .Alaska 99501 61 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. Anchorage, Alaska 99508 1 :Attn: David litter 0 1 TOTALS FOR THIS PAGE: 0 1 4 0 0 RECEI D 2.-\2'O‘3 ! /2.1tiCo Rall JUN 19 2017 PRINT DISTRIBUTION LIST BAKER HUGHES ^ 4 Please sign and return one copy of this transmittal form to: COMPANY B xp ora io Alaska Inc. BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 DATA LOGGED WELL NAME 18-08B 900 E. Benson Blvd. G /u+/201/ M.K.BENDER Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE RPM:PNC3D-CO BHI DISTRICT Alaska --- LOG DATE June 3,2017 AUTHORIZED BY Paul Canizares EMAIL Paui.Canizares c(Dbakerhughes.com TODAYS DATE June 16,2017 Revision STATUS Final Replacement: No Details: Rev. Requested by: COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM (las,dlis,PDF, META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BO* LOGS LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #OF I'RIN IS #OF COPIES #OF COPIES #OF COPIES V 4 V V V 1 BP North Slope. 0 0 0 0 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 1 1 0 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 0 0 1 0 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 0 0 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 1 0 0 Attn:James Hyun 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. 0 0 0 0 0 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn:Behrooz Raessi SCANNED JUL 1 12017 TOTALS FOR THIS PAGE: 0 3 4 0 0 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p_l o�- 0_13 Well History F' a Identifier Organizing (done) Two-sided ❑ Rescan Needed RES N: OVERSIZED: NOTES: o r Items: ❑ Ma s: Grayscale Items: Logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: NM Date: Cij I At /s/ (lIP Project Proofing BY: C Maria) Date: 9JJô t if /s/ Scanning Preparation x 30 = b6. + = TOTAL PAGES b8/ (Count does not include cover sheet) ry BY: (—Maria Date: CI 10 ! f /s/ Production Scanning Stage 1 Page Count from Scanned File: bil (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES 1114 NO BY: 412. Date: id `/ L.� /s/ P Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO 1 BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o N v 2 i 9 U a) U n L c- Z C J a3 a d c coN f0 co U o) U y� + - Q 9 m c o d d Iii 2 N 0 J 0cn F. ? z >. CC a Ili tia Q c m I c Z a > U T O CL U °x J `) o u Ez c _ >a) t 0 U 4 c d U 5 a Ct (/) .cL) 'rn •y w d V °) u_ co ZU o m m a c W m > = Q E oU c co m 0 E co I- o0 o y g U a d 5L a) C E co o J U CO X CO 0 0o aE)� 2(9 a > 2 e 0 >0 U Ce E o a 1- a 2 1- 2 a O U 2 1- 0 0 2 1— a Z I .� � m 0 m O c 1N N N N co _M co co co co co co G'r ,n 0. i= U . > O O O O O O N W CO y N N N N N N N N N N N N R N 7 0 C") co co co M M OO O 0 0 0 Cl) Z A/ 0 1 co V V et V co co (O t0 l0 (O CO ("B- a. a) a) W W a)X I _ c c c c c c c c c c C c J N a) a) a) a) al a) a) N V I I a a a a a a a a a a a s a) V m "(--.5. 0 U 0 0 0 0 0 0 0 0 0 0 0 0 •> Z la 1O O O 0 N N 0 0 0 C2 0 Qco co I O N 0 N N 0 0 N N N N y 7 a7 </) o CO Oaa) r CL C9 a Z 0 0 0 o N0 0 CO N a/) O � � O O N O CO N O N .� CO M M 0 O M CO 0 M co O I I= y C/) O CP O (A O CO O O co O N a C-=-1 E a pp U m Co) c J CLZo Qo V. i Z 'O OTo co co c J fo N N LO N LO coCC t O a) v� I o f6 ,U m 0 ° I Lu Q a. co o Qo a 1 z1 / x O z o — > >. w - w w OS v Z Z Z Z fu in in in U) w z = co co u) u) aa)i a) aa)) aa)i N N CY CC CC 0 CC CC To d o c c c c c c c c c �N So O O O O o 0 0 o O c W Z(13 ) C) U U U U U U U C a) a) N N 7 7 = 7 7 7 7 7 v CI G CI Z O 15 Z Z C C C C c c to E iu CI z ° Ha )n N Q L c d E N N N N N N N N W N 2 O 5 CL a0 W o Z N N N N N N N N d w 0 E E E z • o ` LL w w a CO m N Z 0 O IN 0 O• .) c O d Q Q d J J Q ce z W o) 2 U U 0 0 U o` 2 y J IIU o d LU O F- J g H W. W UW W J W CL UW J J W Jo f Z �- r I' � l II )f 7 o 0 N / J 4 f / 7l n Z } >- >- N y N L T o a i' FL 0 a m Q N a) o ata o 0 -J J A U ° A 1 z U) z� z a Nl• e/y } o A/ J N LIQ Q p i OZ 7 f0 N H Ci O S' 0 W g a m ��// O ' LI 0 a E i� E Xa) H N a) W w ,,, N 0) D U m (T? € 3 E o Z 8 — H a? cn O 0) N N Q r O p O H) J G C 7 a • = E 0. O 2 U U M o r a) O o N o- E UIn a O o J >- >- } CO / Q03 i I I..' E 1 1 ~ o Z _N CD m M o E 1 3 O a) ` = N U N C O C C O • 15 111:1( c E• m O Z m 4.' -v.N Z a0 } } } i I o el 03 ✓ N N € 03 N -cc t i a) F. O a) O Y CC 6H co fl) o o e- O p N ea E 0. E o 0 E '1 E a 2 o a 0 0 0 oa., II c o t:si • m aJ 0.1 U I on s cu ro Iu co 0 cc X 6 N CV nW W _0Q1 a-' N CO 0 z N _C _c OC cv pin 44 ra Y co F 0cc�` . . @ a) 0 T Q a .,, co ❑ ro O v E O J a y U }, Vt E - C C L G k Y 2 z $ v v v v v v v v rcs ZQ w '. r - , . , . . , c r6 Q a- ix cc 1 0 C 3 3 7 z = z = 3 OU -O O > W' O 40 N O v > L • H F... 01 01 D • (1) Y co Y • D ra N u •_ C Y , —0 ,_ a) C O i Q CU O C O Y OD v., 6) 000000 000 0 � -a 0 N 0 03 '� La J J J J J J J J J a1 C .2 L) C yp - yam.' W W W W W W W W W tY -- "_ t �_ F LL LL LL LL LL LL LL LL LL @ u a) _0 a) . Q J J J J J J J J J y >— i H < < < < < < < < < C p Ov E6. ' E _ ZZZZZZ ZZZ 6a) Y ,o CC, LL LL LL LL LL LL LL LL LL C p C V Y.1 a) a) N w 0-1 0 IL > > C Ur3 is N O } O CO CO ��(( w m U N I I D 4Uop rn o F- m J p a L.L. i v W o J 3 3 3 a w a o O N ^' .g .ti z a' a' N N • c� r W a a a W ✓ tC > a a a Y APrf ZZ o / a CC CC N J 0 J J J J J J 0 W W 5. v a m • > `C I X N WQ Q Q Q Q f6 0o 0 LU C.7 m o0 m m m Z ~ 0 r6 On Qz W W W W Wcn 0 J Q 2 2 2 2 2 m ❑ W W y 4 ... ❑ ❑ ❑ ❑ ❑ co ,, ZZ C{{ ❑ > > > > JWa a aJ 0.0,-a a a c rp o h r t0 cocoH u) c0 V c o 0 0 0 CO 0 0 o c a , d' 0 0 0 0 0 0 o p o qp O uj 0 0 0 0 0 c = O 0 .N -0 OC M z D U m u_ p w • W - ZZC - L N U U U U U U L v m ._ o ,� w e a / u m =1 w H (9,-) ra .- aJ f6 ri_ H N Y E 1. Q 'If) O W Q O tµ m < M C) a' C ca-, [O J z 00 m m m W J N a a +�+ al CC !0 = Q CC n � W M 2 2 E J Z a1 U d 0 o rsl 3 ( o n C C th 0 0 O VD a N a m \ H a` a m oy �F� , : 1 IVA& BAKER PRINT DISTRIBUTION LIS ;N 10 2O HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME '\`-.6 + 0-6 e't -v-6 1 RUN NUMBER 9 V2 _ C)\ (mandatory) 227 2. FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 6/5/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY CD (digital FINAL digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #UI-THIN I S #OF COPIES #OF COPIES 4 4 4 4 4 4 LI 1 BP Exploration(Alaska)Inc. I 3 I 1 I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I I 1 I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 J I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I 1 I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 McMains, Stephen E (DOA) From: Lastufka, Joseph N (Northern Solutions) [Joseph.Lastufka@bp.com] Sent: Monday, April 09, 2012 11:42 AM To: McMains, Stephen E (DOA) Subject: FW: PBU 18-08B/ PTD#212-013 Hi Steve, Please reference the following well: Well Name: PBU 18-08B Permit#: 212-013 API #: 50-029-21577-02-00 Date of Test: 4/3/2012 Type of Test: IPT (Initial Production Test) Choke Size: 40 Choke Unit: 64ths Production Method: Flowing Duration (Hours Tested): 10 Top Reference (Top Perf MD): 10270' Bottom Reference (Bottom Perf MD): 10990' Tubing Flowing (Pressure): 0 Casing Pressure: 1650 Total Test (Rate f/ 0, W, G): 1543 / 26 /2394 24-Hour Rate (0, W, G): 3703 /62 / 5745 Gravity (Oil, API): 28.2 Deg GOR (Gas-Oil Ratio): 1551 This well began Production on: 4/2/2012 Method of Operations on this date: Flowing 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ,...___ . 1a. Well Status: ® Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 ® Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 3/5/2012 212-013 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 2/21/2012 50-029-21577-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 2/29/2012 PBU 18-08B 603'FNL,312' FEL, Sec.24,T11 N, R14E, UM 8. KB(ft above MSL): 53.70' 15.Field/Pool(s): Top of Productive Horizon: 915' FNL,4564'FEL, Sec.24,T11 N, R14E, UM GL(ft above MSL): Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): 999'FNL,250' FEL, Sec.23,T11 N, R14E, UM 11171' 8723' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 691439 y- 5961258 Zone- ASP4 11210' 8726' ADL 028307 TPI: x- 687196 y- 5960838 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 686233 y- 5960730 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES,GR/CCL/MCNL 9621' 8382' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 16" 62.5# H-40 Surface 110' Surface 110' 24" 1635#Poleset 10-3/4" 45.5# L-80 Surface 3908' Surface 3791' 13-1/2" 2500 sx Cold Set III.420 sx Cold Set II 7-5/8" 29.7# L-80 Surface 9536' Surface 8308' 9-7/8" 450 sx Class'G'.200 sx Arctic Set I 4-1/2" 12.6# L-80 9380' 9621' 8183' 8382' 6" 267 sx Class'G' 3-1/2"x3-114"x2-7/8" 9.2#/6.6#16.4# L-80 9487' 11209' 8269' 8725' 4-1/4" 121 sx Class'G' / 24. Open to production or injection? ® Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 spf 4-1/2", 12.6#,L-80 9369' 9314'/8130' MD TV, D 10270'-10540' -8724' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10610'-10990' :724'-871€RECENED DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ' Ls':viii I f' i ' 2500' Freeze Protect w/38 Bbls Diesel N-- APR3 212 ,F ir:> I ., 1 Alaska Di&rz8S Cons.Commission AnCh 9 27. ,Ira a I$RODUCTION TEST 4 Date First Production: , _..-.----------MetRbd of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes Ei No Sidewall Core(s)Acquired? 0 Yes IN No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RSDMS APR 0 4 1012 /� S 47) Form 10-407 Revised 12/2009 CONTINUED ON REVERSE 21` 4_�../Z �/ i i incl Only G tLoG rfarie--- 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 MC 25.071. CGL/Zone 3 9673' 8430' None Base of CGL/Zone 2C 9747' 8495' 23SB/Zone 2B 9812' 8545' 22TS 9867' 8581' 21TS/Zone 2A 9946' 8622' Z1B 10052' 8672' TDF/Zone 1A 10160' 8710' Formation at Total Depth(Name): TDF/Zone 1A 10160' 8710' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that th- . •-•oing i t ue n rest to the best of my knowledge. Signed: Joe Lastufka , 10 Title: Drilling Technologist Date: /2-/0-- PBU 18-08B 212-013 Prepared By Name/Number Joe Lastufka,564-4091 Well Number Permit No./Approval No. Drilling Engineer: Mark Staudinger,564-5733 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: TheAPI number reportedA must14 digits(ex: 50-029-20123-00-00). to be to OGCC be d g is Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. 1 Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 MC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4-1/16"CW WELLHEAD= FMC SA, NOTES:WELL ANGLE>70°@ 10108'. ACTUATOR= BAKERC DRLG DRAFT 1 8 ®p 8 D INITIAL KB. ELEV 49' BF. ELEV= 22.06' KOP= 2875' J . --)] Max Angle= 93°@ 10989' 16"CONDUCTOR, —L 110' Datum = N/9' 61#,H-40, I 2180' -14-1/2"CAMCO BA L-O SSSVN, ID=3.812" Datum TVD= 8800'SS ID=15.250" O 10-3/4"CSG,45.5#, L-80 IBTC,ID=9.950" H 3908' GAS LIFT MANDRELS TOP JOINT IS J-55 BTC ST MD 'VC DEV TYPE VLV LATCH PORT DATE 1 3016 3010 15 CA-MBX DMY BK 0 11/25/05 2 5732 5192 38 CA-MBX DMY BK 0 11/25/05 3 7805 6881 32 CA-MBX DMY BK 0 02/06/98 Minimum ID = 2.370" 10253' 4 9248 8078 38 CA-MBX DMY BK 0 11/25/05 3-3/16" X 2-7/8" XO PIN S 9314' —17-518"X 4-1/2"BKR S-3 PKR, ID=3.937" 9347' -+4-1/2"HES X NIP. ID=3.813" TOP OF 4-1/2"LNR H 9366' —1 9366' —I7-5/8"X 4-112"BKR ZXP PKR/TIEBK, fD=4.938" 4-1/2"TBG, 12.6#, L-80 IBT --1 9369' L ' 9369' --I4-1/2"WLEG, ID=3.958" 0152 bpf, ID=3.958" I"----H 9380' —+7-5/8"X 5-1/2"BKR HMC HGR, ID=4.813" -'''''\ 9386' 15-1/2"X 4-1/2'XO,ID=3.958" 7-5/8"CSG,29.7#, L-80 BTC, ID=6 875" H —9536' 7-5/8" MILLOUT WINDOW (18-08A) 9536'-9548' 1NCI, 9487' H3.70"BKR DEPLOY SLV, ID=3.00" ii 9508' —13-1/2"HES X NIP, ID=2.813" 4 Ili 3-1/2"LNR,9.2#,L-80 STL, .0087 bpf, ID=2.992" — 9541' li 4-112"LNR, 12.6#,L-80 IBT-M, -1 —9621 9541' —13-112"X 3-1/16"X0, ID=2 786" 0152 bpf, ID=3.958" IF 9599' —14-1/2"HES X NIP,ID=3.813"(BEHIND CT LNR) 8KR WHIPSTOCK(02/19/12) H 9621' A4-1/2"MILLOUT WINDOW (18-0BA) 9621'-9631' / 3-1/4"LNR,6 6#, L-80 TCII, .0079 bpf, ID=2'.850" H 10255' \ :i PERFORATION SUMMARY 10255' —3-3/16"X 2-7/8"XO,ID=2.370" REF LOG: BHCS ON 03/03/12 ANGLE AT TOP PERF: °@ 10270' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10270- 10540 0 03/04/12 2-7/8" 6 10610- 10990 0 03/04/12 PBTD H 11171' 2-7/8" LNR,6.4#,L-80 STL, .0058 bpf, ID=2.441 H 11209' o DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/21/86 N28E INITIAL COMPLETION WELL. 18-088 02/06/98 D-09 SIDETRACK(18-08A) PERMIT No:'2120130 03/05112 NORDIC 2 CTD SIDETRACK(18-08B) API No: 50-029-21577-02 03/06/12 PJC DRLG DRAFT CORRECTIONS SEC 24,T11 N, R14E,603'SNL&312'WEL BP Exploration (Alaska) North America -ALASKA- BP Page 1 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/17/2012 14:00 - 17:00 3.00 MOB P PRE BEGIN RON EVENT AT 14:00 ON 2/17/2012. MOVE RIG DOWN PAD FROM 18-04C. SET DOWN RIG. MOVE AND SPOT RIG MATS AROUND 18-08 WELLHEAD. CLEAN UP WELLHEAD AREA. 17:00 - 18:00 1.00 MOB P PRE HOLD PJSM WITH SLB&NORDIC CREW. SPOT RIG OVER WELLHEAD. 18:00 - 19:00 1.00 RIGU P PRE SECURE CELLAR AND INSTALL WALKWAYS AROUND RIG 19:00 - 20:30 1.50 RIGU P PRE ACCEPT RIG AT 19:00 ON 2/17/2012. PJSM -REMOVE TREE CAP -INSTALL ADAPTOR FLANGE 20:30 - 22:30 2.00 BOPSUR P PRE PJSM -NIPPLE UP 7-1/16"X 5M TOT BOPE, RAMS ARRANGED AS FOLLOWS: -HYDRIL GK ANNULAR PREVENTER -BLIND SHEAR RAMS -2-3/8"COMBI RAMS -FLOW CROSS,HCRS ON CHOKE&KILL LINES 2-3/8"X 3-1/2"VB RAMS -2-3/8"COMBI RAMS -INSTALL NEW REEL 22:30 - 00:00 1.50 BOPSUR P PRE PJSM -CHANGEOUT SWABS ON MUD PUMP#1 -INSTALL INNER REEL HARDLINE _ -MAKE UP BULKHEAD AND J BOX 2/18/2012 00:00 - 02:00 � 2.00 BOPSUR P PRE MU BULKHEAD AND GRAPPLE 02:00 - 02:30 i 0.50 BOPSUR P PRE CHANGEOUT LUBRICATOR FOR CORRECT HEIGHT ON RIG FLOOR 02:30 - 03:30 1.00 BOPSUR P PRE TAKE ON RIG WATER 03:30 - 05:30 2.00 BOPSUR P PRE PJSM f7L • CONDUCT FULL BOPE TEST PER AOGCC AND ADWOP REQUIREMENTS. /if -AOGCC GIVEN 24 HOUR NOTICE. -RIGHT TO WITNESS TEST WAIVED BY AOGCC,C.SCHEVE. 05:30 - 06:00 0.50 BOPSUR P PRE RIG EVAC DRILL FOLLOWED BY AAR 06:00 - 06:30 0.50 BOPSUR P PRE CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE TO TEST BOP EQUIPMENT. 06:30 - 09:30 3.00 BOPSUR P PRE CONTINUE BOP TEST PROCEDURES. COMLETE BOP TEST. NO FAILURES. SEE ATTACHED DOCUMENTATION. 09:30 - 10:30 1.00 BOPSUR P PRE DETECTED 6 PPM GAS NEAR WING VALVE. PRESSURE TEST WING VALVE TO 250/3500 PSI. NO BLEED OFF. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 2 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum:18-08A©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 13:00 2.50 RIGU P PRE HOLD PJSM. REVIEW SLB STABBING PROC. RIG UP TUGGER WITH COIL GRAPPLE. UNSECURE COIL FROM REEL. REMOVE SHIPPING MATERIALS. PULL COIL ACROSS ROOF AND THROUGH INJECTOR. SECURE SAME. RD GRAPPLE EQUIPMENT. 13:00 - 13:30 0.50 RIGU P PRE TEST E-LINE ISOLATION AND CONDUCTIVITY. BOTH INDICATE GOOD LINE. 13:30 - 15:00 1.50 RIGU P PRE DRESS COIL. MAKE UP COIL CONNECTOR. TEST SAME TO 40K 15:00 - 17:50 2.83 RIGU N RREP PRE PUMP MEOH. REEL HOUSE MANIFOLD PRESSURED UP. FOUND CEMENT IN LINES TO HIGH PRESSURE SCREENS. CLEAN OUT SAME. PRESSURE TEST STANDING IDON IN REEL HOUSE _ FILL COIL AT T 3.2 BPM FOR 64 BBLS 17:50 - 19:20 1.50 BOPSUR _N PRE PERFORM INNER REEL VALVE AND PACK-OFF TEST 19:20 - 21:00 1.67 BOPSUR N PRE INSTALL DUAL FLAPPER CHECKS -INSTALL TEST PLATE -PRESSURE TEST CONNECTOR TO 4000 PSI -PRESSURE TEST CHECKS TO 3500 21:00 - 21:15 0.25 RIGU N PRE !PJSM FOR PULLING TWC 21:15 - 23:30 2.25 ; RIGU N ' PRE RIG UP FOR PULL TWC -PRESSURE TEST LUBRICATOR TO 300 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MIN -PULL TWC -WELL ON VAC -RIG DOWN LUBRICATOR 23:30 - 00:00 0.50 RIGU N PRE AAR FOR PULLING TWC -PJSM STAB INJECTOR AND BULLHEAD WELL 2/19/2012 00:00 01:00 1.00 KILLW P WEXIT BULLHEAD WELL KILL WITH 270 BBLS OF 8.4 PPG 2%KCL WITH A FINAL CIRCULATING PRESSURE OF 475 PSI 01:00 - 03:00 2.00 KILLW P WEXIT MONITOR WELL,WELL ON STRONG VAC -ESTABLISH LOSS RATE FILLING ACROSS THE TOP OF 2.2 BPM '-CALL BP SUPT AND ODE SINCE LOSS RATE IS OVER 50%OF HOLE FILL RATE -AGREE ON PLAN TO PUMP 1.5X WELLBORE VOLUME OF MUD TO SEE IF IT HEALS LOSS RATE. 03:00 - 05:00 2.00 KILLW P 1 I WEXIT CLEAN PITS FOR MUD SWAP 05:00 - 06:00 1.00 KILLW P WEXIT MIX 40 BBL HI-VIS PILL 06:00 - 06:30 0.50 KILLW P WEXIT CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE ALL CHECKS AND ROUNDS. CONTINUE TO LOAD PITS WITH MUD. 06:30 - 08:30 2.00 KILLW P WEXIT CONTINUE TO PREP TO PUMP HI VIS PILL AND MUD. PUMP 40 BBLS HI-VIS MUD. BULLHEAD TO PERFS WITH FLO-VIS MUD. 780 PSI AT 3.5 BPM MAX PRESSURE. PRESSURE INCREASING AS PILL COVERS PERFS. SHUT DN AT 150 BBLS TOTAL PUMPED. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 3 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3 011 K0 C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (ft) 08:30 - 10 30 2.00 KILLW P WEXIT MONITOR WELL. 1.0 BPM IN/0.8 BPM OUT. COMPLETE KCL TO MUD SWAP IN PITS. 10:30 - 11:30 1.00 STWHIP P WEXIT MU WHIPSTOCK DRIFT ON BHI TOOLS. STAB COIL. TEST TOOLS. GET ON WELL. TOOK 7 BBLS TO FILL HOLE. 11:30 - 14:30 3.00 STWHIP P WEXIT RUN IN HOLE AT 55 FPM. SLOW DOWN THROUGH ALL JEWELRY. 14:30 - 15:45 1.25 STWHIP P WEXIT FLOG INITIAL GR TIE IN TO PDC LOG,FROM 9430'. SUBTRACT 19'CORRECTION. 15:45 - 16:00 0.25 STWHIP P WEXIT RUN IN HOLE TO 9710'. MONITOR HOLE. GET MANUAL PIT STRAP. 16:00 - 17:45 1.75 STWHIP P WEXIT CIRCULATE THROUGH EDC WHILE POOH. 17:45 - 18:15 0.50 STWHIP P WEXIT AT SURFACE. MONITOR WELL FOR FLOW. 18:15 - 18:45 0.50 STWHIP P WEXIT CREW CHANGE,NEW CREW FROM TOWN PRE-TOUR CHECKS,WALK AROUNDS 18:45 - 19:50 1.08 STWHIP P WEXIT PJSM MU WHIPSTOCK BHA PRESSURE TEST QUICK TEST SUB 19:50 - 23:10 3.33 STWHIP P WEXIT RIH WITH WHIPSTOCK AT 55 FPM EDC OPEN CIRCULATING 0.4 BPM WHILE RIH SLOW DOWN THROUGH ALL JEWELRY 23:10 - 00:00 0.83 STWHIP P WEXIT TIE-IN WITH GR FROM 9460'TO 9540', SUBTRACT 18'CORRECTION PUW=42K SOW=19K 2/20/2012 00:00 - 00:50 0.83 STWHIP P WEXIT CONFIRM COLLAR AT 9639'WITH CCL -VERIFY WHIPSTOCK ORIENTED AT 15 DEG LEFT OF CENTER \\J -SET WHIPSTOCK WITH TOP AT 9620' BOTTOM AT 9635.4'BY CLOSING EDC AND PRESSURING UP TO 2850 WHEN THE TOOL SET -CONFIRM SET BY PUTTING 2500 LBS DOWN ON WHIPSTOCK 00:50 - 03:00 2.17 STWHIP P WEXIT POH WITH WHIPSTOCK SETTING TOOL 03:00 - 03:15 0.25 STWHIP P WEXIT FLOW CHECK WELL FOR 10 MIN AT SURFACE 03:15 - 04:00 0.75 STWHIP P WEXIT UNSTAB COIL -LAY DOWN WHIPSTOCK SETTING BHA 04:00 - 05:00 1.00 STWHIP P WEXIT PICK UP WINDOW MILLING BHA -3.8"GO,3.79"NO-GO ON MILL AND STRING MILL -STAB COIL AND TEST TOOLS 05:00 - 06:00 1.00 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA 06:00 - 06:30 0.50 STWHIP P WEXIT CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE E j ROUNDS. CONTINUE TO RIH WITH MILLING BHA. 06:30 - 07:15 0.75 STWHIP P WEXIT CONTINUE TO RIH. LOG GR TIE IN. SUBTRACT 18'CORRECTION. CONTINUE TO RIH. RECORD SLOW PUMP RATES: #1 1.5 BPM@1824 PSI,0.5 BPM@1326 PSI #2 1.5 BPM@1860 PSI,0.5 BPM©1366 PSI Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 4 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.:NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA :UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:15 - 12:00 4.7.7 5 STWHIP P WEXIT TAG WHIPSTOCK AT 9621'. R 2900 PSI FS AT 2.78 BPM IN/OUT. 42K#UP, 20K#DN WT. BEGIN TIME MILLING. 12 MINUTES PER 0.1'. FOR 1 FT. INCREASE RATE TO 6 MINUTES PER 0.1' DHWOB: 1.5-2.0K# 12:00 - 16:00 4.00 STWHIP P WEXIT MILL TO 9627' APPEAR TO HAVE EXITED CASING. 16:00 - 18:30 2.50 STWHIP P WEXIT DRILL FORMATION FROM 9627' 2850 PSI FS AT 2.79 BPM IN/OUT. DHWOB:0.6k# L n 18:30 - 19:45 1.25 STWHIP P WEXIT RIH AT 1 FPM BACK THROUGH WINDOW -AT 9622.7'WEIGHT ON BIT FROM 0 TO 1.7K# -CALL NS SUPT AND ODE TO AGREE ON PLAN TO MILL AHEAD ATTEMPTING TO MAKE PROGRESS -MILL FROM 9622.7'TO 9623.6'WHERE WOB DROPPED TO 0 AND ABLE TO MAKE IT DOWN HOLE. 19:45 - 20:20 0.58 STWHIP _ P WEXIT WORK THROUGH WINDOW AND DOWN TO RATHOLE DEPTH OF 9639'FOR FIRST PASS. 20:20 - 21:00 0.67 STWHIP P WEXIT PULL UP ABOVE WINDOW TO 9611'AND MOVE BACK DOWNHOLE THROUGH WINDOW 'TO 9639'FOR SECOND PASS. 21:00 - 21:40 0.67 STWHIP P WEXIT PULL UP ABOVE WINDOW TO 9611'AND MOVE BACK DOWNHOLE THROUGH WINDOW TO 9635 FOR THIRD PASS. 21:40 - 21:50 0.17 STWHIP R WEXIT PULL UP TO 9611'AND SHUT DOWN PUMPS -RIH AND DRY DRIFT THE WINDOW TO TAG 9639' -NO WOB DURING DRY DRIFT 21:50 - 22:00 0.17 STWHIP P WEXIT PULL UP ABOVE WINDOW TO 9605' -OPEN EDC AND FLOW CHECK THE WELL FOR5MIN 22:00 - 00:00 2.00 STWHIP P WEXIT PUMP 20 BBL SWEEP AND POOH FROM 9605' 2/21/2012 00:00 - 00:50 0.83 STWHIP P WEXIT CONTINUE POOH 00:50 - 01:00 0.17 STWHIP P WEXIT TAG UP AT SURFACE AND FLOW CHECK WELL=OK-STAND BACK INJECTOR 01:00 - 01:20 0.33 STWHIP P PROD1 KICK WHILE TRIPPING DRILL W/AAR-VERY GOOD RESPONSE BY CREW-EXPLAIN PROCESS AND RESPONSIBILITIES TO NEW NORDIC ROUSTABOUT 01:20 - 01:30 0.17 STWHIP P PROD1 LAY DOWN MILLING BHA#3-MILL=3.79"GO/ 3.78"NO GO-STRING REAMER=3.80"GO/ 3.79"NO GO 01:30 - 02:30 1.00 DRILL P PROD1 CHECK TORQUE ON TREE BOLTS=OK-PU BUILD BHA CONSISTING OF: HYC BI-CENTER 3.75"X 4.25"BIT, BHI2.875"ULTRA LS MTR, HOT, USR,DGS, DPS, EDC, P&C,WEAR SUB, LQC,UQC,XO,CC 02:30 - 04:30 2.00 DRILL P PROD1 RIH W/BUILD BHA#4 WHILE CIRC AT MINIMUM RATE Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 5 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 06:00 1.50 DRILL P PROD1 TIE-IN WITH(-19)CORRECTION AT 9404' -OBTAIN SPRS PUMP#1 0.5 BPM= 1165 PSI,1.5 BPM= 1545 PSI PUMP#2 0.5 BPM= 1170 PSI,1.5 BPM= 1567 PSI -CONTINUE IN HOLE 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS OPERATIONS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND OUTSIDE ROUNDS. CONTINUE TO RIH. 06:30 - 11:30 5.00 DRILL P PROD1 THROUGH WINDOW OK. DRILL AHEAD FROM 9635'. 3210 PSI FS AT 3.04BPM IN/OUT. 200-300 PSI MTR WORK. 1.0-2.0K#DHWOB. IA/OA/PVT: 192 PSI/193 PSI/445 BBLS. BHP/ECD/TVD:4267 PSI/9.86 PPG/8308' DRILL TO 9761' 11:30 - 14:30 3.00 DRILL P PROD1 POOH FOR AKO CHANGE. 1.2 DEG MTR GETTING 16 DEG DOG LEG. NEED 12 DEG. 14:30 - 15:30 1.00 DRILL I P PROD1 AT SURFACE. FLOW CHECK. HOLD BHA PJSM. CHANGE AKO ON MOTOR FROM 1.2 TO 1.0 BIT GRADED 4-1 WITH CHIPPED NOSE CUTTERS. STARTING TO RING OUT. •15:30 - 16:30 1.00 i DRILL P PROD1 MU NEW 4-1/4" HYCALOG BICENTER BIT W/ TORQUE CONTROL BUTTONS ON 1.0 DEG MTR AKO. STAB COIL. TEST TOOLS. GET ON WELL TEST QUICK TEST SUB. _ TOTAL BHA LENGTH=80.64' 16:30 - 19:45 3.25 DRILL I P PROD1 TRIP IN HOLE FROM 81'MD TO 9525'MD. TIE-IN TO TSAD AT 9525'ON 18-08A PARENT WELLBORE PDC LOG(-19'CORRECTION). 'CONTINUE TO TIH TO PREVIOUSLY DRILLED MD OF 9761'MD. NO ISSUES RUNNING THROUGH WINDOW AT 9621'MD WITH PUMPS OFF. SLOW PUMP RATES AT 9761'MD,8.6 PPG, 19:30: -MP#1: 0.5 BPM= 1230 PSI,1.5 BPM= 1710 PSI -MP#2: 0.5 BPM= 1256 PSI,1.5 BPM= 1700 PSI 19:45 - 00:00 4.25 DRILL P PROD1 DIRECTIONAL DRILL 4-1/4"HOLE FROM 9761' MD TO 9854'MD(93'IN 4.25 HRS=22 FPH);3 BPM,3200 PSI PUMP PRESSURE,50-100 DIFFERENTIAL PSI,226 BIT RPM,1-3 KLBS WOB. NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=8.6 PPG. 9.9 PPG ECD. PU WEIGHT=44 KLBS,SLACKOFF =16 KLBS. IA/OA=205/220 PSI. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 6 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date: 2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/22/2012 00:00 - 04:00 4.00 DRILL P PROD1 DIRECTIONAL DRILL 4-1/4"BUILD SECTION FROM 9854'MD TO 9916'MD(62'IN 4 HRS= 16 FPI-0;2.5-3 BPM;2700-3100 PSI ON BOTTOM,50-125 PSI DIFFERENTIAL PRESSURE. 188-226 BIT RPM. 1 -3.5 KLBS WOB. NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=8.6 PPG. 9.8 PPG ECD. PU WEIGHT=42 KLBS. IA/OA= 205/230 PSI. SURVEYS EVERY 30'SHOW DOG LEG SEVERITY 16-18 DEG/100'. DECISION TO TRIP OUT OF HOLE TO DECREASE MOTOR BEND ANGLE. 04:00 - 06:00 2.00 DRILL P PROD1 CHECK WELL FOR FLOW. WELL STATIC. TRIP OUT OF HOLE FROM 9916'MD TO WINDOW AT 9621'MD. OPEN EDC AND FLOW CHECK WELL. WELL STATIC. CONTINUE I, - l TRIP OUT OF HOLE FROM 9621'MD TO BHA AT 81' MD;2 BPM,2050 PSI. 06:00 - 06:30 0.50 DRILL P I PROD1 CREW CHANGE. DISCUSS CURRENT OPS AND RIG STATUS. PERFORM INSIDE AND OUTSIDE CHECKS. CONTINUE TO CIRCULATE OUT OF HOLE. 06:30 - 07:45 1.25 DRILL P PROD1 AT SURFACE. JOG IN HOLE. FLOW CHECK. GET OFF WELL. UNSTAB COIL. STAND BACK MWD TOOLS. REDUCE MTR ANGLE FROM 1.0 TO 0.8 DEG. BIT IN EXCELLENT CONDITION. RE-RUN • HYCALOG BI-CENTER WITH TORQUE CONTROL BUTTONS. STAB COIL. TEST TOOLS. GET ON WELL. TEST QC SUB. 07:45 - 09:30 1.75 DRILL P PROD1 RUN IN HOLE. 09:30 - 10:30 1.00 DRILL P PROD1 LOG GR TIE IN FROM 9580'. SUBTRACT 19' CORRECTION. RECORD SLOW PUMP RATES: #1:0.5/1230, 1.5/1710 BPM/PSI #2 0.5/1256, 1.5/1700 BPM/PSI RIH TO BOTTOM. 10:30 - 13:15 2.75 DRILL P PROD1 DRILL AHEAD FROM 9916' 2990 PSI FS AT 3.04 BPM IN/OUT. 150-250 PSI MTR WORK. 2-3.0K#DHWOB. IA/OA PVT:205 PSI/175 PSI/437 BBLS. BHP/ECD/TVD:4425 PSI/9.91 PPG/8581' DRILL AHEAD TO 10050'. 13:15 - 14:30 1.25 DRILL P PROD1 WIPER TRIP TO WINDOW. 2990 PSI AT 3.-3 BPM IN. PVT:429 BBLS. HOLE SMOOTH. 14:30 - 17:00 2.50 DRILL P PROD1 DRILL AHEAD FROM 10050'. 3050 PSI FS AT 3.01 BPM IN/OUT. 200-250 PSI MTR WORK. • DRILL TO 10200'. Printed 3/19/2012 11:31:22AM North America-ALASKA- BP Page 7 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 17:30 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. 2770 PSI FS AT 2.79 BPM IN. PVT:431 BBLS. NOTE: WELLBORE SWITCHES TO DS18-08BPB1 DUE TO PLANNED SIDETRACK AFTER HOLE PROBLEMS DUE TO SHALE AT 11200'MD). SEE 2/22/12 REPRT#6B FFOR REMAINDER OF 24 HOUR TIME SUMMARY. 17:30 - 22:00 4.50 DRILL P PROD1 BEGIN WELLBORE DS18-08BPB1: 'DIRECTIONAL DRILL 4-1/4"HOLE FROM 10200' MD TO END OF BUILD HOLE SECTION AT 10350'MD(150' IN 4.5 HRS=33 FPH);2.8 BPM, 3000 PSI CIRC PRESSURE,150-250 PSI DIFFERENTIAL PRESSURE. 188-226 BIT RPM. 1 -3.5 KLBS WOB. NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=8.7 PPG. 9.9 PPG ECD. IA/OA= 310/311 PSI. SLOW PUMP RATES AT 10200'MD,8.7 PPG, 18:30: -MP#1: 0.5 BPM= 1252 PSI,1.5 BPM= 1721 PSI -MP#2: 0.5 BPM= 1234 PSI,1.5 BPM= 1685 PSI NOTE: BUILD SECTION LANDED AT 10332' MD,8681'TVD 22:00 - 23:15 1.25 DRILL P PROD1 PERFORM PLANNED WIPER TRIP FROM 10350'MD TO WINDOW AT 9621'MD. PICKUP WEIGHT OFF BOTTOM=44 KLBS,SLACKOFF =19 KLBS. NO HOLE ISSUES. TIE-IN TO / WHIPSTOCK RA TAG AT 9630'MD ON TIH(+4' 1' CORRECTION). 23:15 - 00:00 0.75 DRILL P rt PROD1 DIRECTIONAL DRILL 4-1/4"LATERAL HOLE SECTION FROM 10350'MD TO 10366'MD AT MIDNIGHT(16'IN 45 MIN=21 FPH). TVD= 8679'. 2.9 BPM,3100 PSI(200-300 PSI DIFFERENTIAL). WOB=3-5 KLBS. NO LOSSES TO FORMATION,MW IN=MW OUT= 8.7 PPG. ECD=9.9 PPG. IA/OA=399/383 PSI. 2/23/2012 00:00 - 06:15 6.25 DRILL P PROD1 DIRECTIONAL DRILL 4-1/4"LATERAL HOLE SECTION FROM 10366'MD AT MIDNIGHT TO 10434'MD(68' IN 6 HRS= 12 FPH);2.9 BPM, 3000-3100 PSI(100-200 PSI DIFFERENTIAL). WOB(DOWNHOLE SENSOR)=4-5 KLBS. NO LOSSES TO FORMATION, MW IN=MW OUT= 8.7 PPG. ECD=9.9 PPG. IA/OA=475/300 PSI. UNABLE TO MAKE NEW FOOTAGE BEYOND 10434'MD(POOR WEIGHT TRANSFER AND LOW MOTOR WORK). DECISION TO TRIP OUT OF HOLE TO CHECK BIT AND MUD I _ MOTOR. 06:15 - 09:30 3.25 DRILL P PROD1 CHECK WELL FOR FLOW. WELL STATIC. PULL OUT OF HOLE FROM 10434'MD TO 4-1/2"LINER WINDOW AT 9621'MD. PICKUP 'WEIGHT OFF BOTTOM=44 KLBS. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 8 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00.00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (ft) 09:30 - 11:30 2.00 DRILL P PROD1 HOLD PJSM. FLOW CHECK WELL. GET OFF WELL. UNSTAB COIL. LD BHA. BIT 1-1. CHANGE DGS SURVEY TOOL. INCREASE MOTOR AKO TO 1.2 DEG. MU NEW HYCALOG 3.75"RAZOR BIT. STAB COIL. TEST TOOLS. GET ON WELL. PT QUICK.TEST SUB. 11:30 - 13:30 2.00 DRILL P PROD1 RUN IN HOLE. 13:30 - 14:30 1.00 DRILL P PROD1 LOG GR TIE IN FROM 9575 SUBTRACT 19' 11 iv% CORRECTION. b' CONTINUE WIPER TO TD. 14:30 - 18:00 3.50 DRILL P PROD1 DRILL AHEAD FROM 10,434'MD TO 10600'MD. 2850 PSI FS AT 2.90 BPM IN/OUT. 200-250 PSI MTR WORK. 2.95K#DHWOB. IA/OA/PVT:286 PSI/72 PSI/420 BBLS. BHP/ECD/TVD:4497 PSI/9.97 PPG/8678' 18:00 - 19:30 1.50 DRILL P PROD1 PERFORM PLANNED WIPER TRIP FROM nj 10600'MD TO 4-1/2"LINER WINDOW AT 9621' MD. NO HOLE ISSUES ENCOUNTERED. 19:30 - 23:00 3.50 DRILL P I PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10600'MD TO 10724'MD(124' VVV"' IN 3.5 HRS=35 FPI ;2.9 BPM,3050-3350 PSI (100-300 PSI MOTOR WORK). WOB (DOWNHOLE SENSOR)=1-4 KLBS. NO LOSSES TO FORMATION,MW IN=MW OUT= 8.7 PPG. ECD=9.9 PPG. IA/OA=400/210 PSI. 23:00 - 00:00 1.00 DRILL P PROD1 PERFORM WIPER TRIP FROM 10724'MD TO 4-1/2"LINER WINDOW AT 9621'MD (CONTINUE ON 2/24/2012 UNTIL 01:00) 2/24/2012 00:00 - 01:00 1.00 DRILL P PROD1 COMPLETE WIPER TRIP FROM 10724'MD TO 4-1/2"LINER WINDOW AT 9621'MD. NO HOLE ISSUES. 01:00 - 02:15 1.25 DRILL P PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10724'MD TO 10772'MD(48' IN 1.25 HRS=38 FPH);3 BPM,3050 PSI FREESPIN,3100-3300 PSI CIRCULATING,1-4 KLBS WOB(DOWNHOLE SENSOR). MW IN= MW OUT=8.7 PPG. ECD= 10 PPG. NO LOSSES TO FORMATION WHILE DRILLING. IA/OA=475/300 PSI. 02:15 - 02:45 0.50 DRILL P PROD1 PERFORM SHORT WIPER TRIP FROM 10772' MD TO 10700'MD. PICKUP WEIGHT OFF BOTTOM=44 KLBS. ENCOUNTER TIGHT HOLE WHILE RUNNING BACK IN HOLE AT 10730'MD. ABLE TO WORK THROUGH WITH 1/2 BPM AND EVENTUALLY FULL DRILLING RATE OF 3 BPM. MAX PICKUP WEIGHT PULLING THROUGH TROUBLE SPOT=63 KLBS. NOTE:DEPTH OF TROUBLE SPOT ROUGHLY CORRELATES TO SHALE/SAND INTERFACE ON GAMMA RAY LOGS. Printed 3/19/2012 11:31:22AM North America-ALASKA- BP Page 9 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:45 - 04:00 1.25 DRILL P PROD1 DIRECTIONAL DRILL 3-3/4"HOLE FROM 10772' MD TO 10796'MD(24'IN 1.25 HRS= 19 FPH); 2.9 BPM,3050 PSI FREESPIN,3300 PSI CIRCULATING.1-4 KLBS WOB(DOWNHOLE SENSOR). MW IN=MW OUT=8"7 PPG- ECD = 10 PPG. NO LOSSES TO FORMATION WHILE DRILLING. IA/OA=500/315 PSI. 04:00 - 06:00 2.00 DRILL P PROD1 PERFORM WIPER TRIP FROM 10796'MD TO 4-1/2'LINER WINDOW AT 9621'MD;2.9 BPM, 2950 CIRCULATING PSI,30 FPM. SLOW PUMP RATES AT 10796'MD,8.7 PPG MW. -MP#1 3 BPM=3010 PSI,1 BPM= 1500 PSI.0.5 BPM= 1350 PSI -MP#2: 3 BPM=2974 PSI,1 BPM= 1523 PSI,0.5 BPM=1260 PSI 06:00 - 06:30 0.50 DRILL P PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTIUE WIPER TRIP FROM 10,796'. 06:30 - 10:00 3.50 DRILL -P PROD1 DRILL AHEAD FROM 10,796'. 3010 PSI FS AT 2.87 BPM IN/OUT. 200-300 PSI MTR WORK. 2.5-3.OK#DHWOB. Y� IA/OA/PVT: 538 PSI/345 PSI/401 BBLS. BHP/ECD/TVD:4658 PSI/10.35 PPG/8662' PUMP 40 BBL SWEEP WITH 1 DRUM KLEEN SCREEN TO HELP CLEAN BIT. NO EFFECT NOTED. 10:00 - 11:00 1.00 DRILL P PROD1 500'WIPER TRIP WHILE CIRCULATING NEW 8.6 PPG POWERPRO MUD IN TO HOLE. (TOTAL FOOTAGE FOR 1ST MUD SYSTEM= 1290'MD) SLOW PUMP RATES: #1: 1.5/0.5 BPM: 1725/ 1205 PSI #2: 1.5/0.5 BPM: 1705/1190 PSI 11:00 - 11:30 0.50 DRILL P PROD1 DRILL AHEAD TO 10,950'. 11:30 - 12:30 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW. .2950 PSI FS AT 2.93 BPM IN/OUT. 12:30 - 15:00 2.50 DRILL P PROD1 DRILL AHEAD FROM 10,950'. 2940 PSI FS AT 2.70 BPM IN/OUT.200 PSI MTR WORK. 3.5 K#DHWOB. DRILLING SHALE INTERVAL. HAVING TO WORK PIPE AND MAKE FREQUENT SHORT WIPER TRIPS. DRILL TO 11060'. 15:00 - 16:45 1.75 DRILL P PROD1 CONTINUE TO DRILL AHEAD FROM 11,060'to _ 11,101'. 16:45 - 19:00 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW. 2705 PSI FS AT 2.72 BPM. PVT:405 BBLS. SLOW PUMP RATES AT 11100'MD,8.7 PPG MW: -MP#1: 3 BPM=2922 PSI,1 BPM=1432 PSI,0.5 BPM= 1146 PSI -MP#2: 3 BPM=2955 PSI,1 BPM= 1421 PSI,0.5 BPM=1165 PSI Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 10 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 00:00 5.00 DRILL P PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11101'MD TO 11180'MD(79' IN 5 HRS= 16 FPH);2.9 BPM,3050 PSI FREESPIN,3100-3400 PSI CIRCULATING,2-4 KLBS DOWNHOLE WOB,NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=8.7 PPG,9.8 PPG ECD. IA/OA=510/310 PSI. MAKE 200'-500'WIPER TRIPS AS NECESSARY. CONSISTENTLY DIFFICULT TO ACHIEVE EFFECTIVE WEIGHT TRANSFER TO BIT. PUMP(2)25 BBL SCREENKLEEN/HI-VIS SWEEPS WHILE DRILLING AHEAD. NOTICE INCREASE IN ROP FOR 10'MD AFTER SWEEP PASSES BIT,BUT IMPROVEMENT IS NOT SUSTAINED. 2/25/2012 00:00 - 02:00 2.00 DRILL P PROD1 DIRECTIQNAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11101'MD TO 11180'MD(79' IN 5 HRS= 16 FPH);2.9 BPM,3050 PSI FREESPIN,3100-3400 PSI CIRCULATING,2-4 KLBS DOWNHOLE WOB,NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=8.7 PPG,9.8 PPG ECD. IA/OA=510/310 'PSI. DECISION TO TRIP OUT OF HOLE TO INSPECT BIT/MOTOR AND TO PICKUP AGITATOR TOOL 02:00 - 06:00 4.00 DRILL P PROD1 FLOW CHECK WELL. WELL STATIC. PULL OUT OF HOLE FROM 11200'MD TO 4-1/2" LINER WINDOW AT 9621'MD. CHECK FOR FLOW. NO FLOW. OPEN EDC. CONTINUE TO TRIP OUT OF HOLE FROM 9621'MD TO BHA AT 81'MD;4 BPM,3500 PSI. CHECK FOR FLOW PRIOR TO BHA ENTERING STACK. WELL STATIC. 06:00 - 07:30 1.50 DRILL P PROD1 GET OFF WELL. UNSTAB COIL. STANDBACK /LD BHA COMPONENTS. CREW CHANGE. DISCSUSS OPS AND RG STATUS. MAKE INSIDE AND OUTSIDE EQUIPMENT CHECKS. CONTINUE TO HANDLE BHA. BIT 1-1. RE-RUN SAME. REDUCE MOTOR ANGLE FROM 1.2 TO 1.0 DEG. MU AGITATOR #AGAR-0288-0066 WITH 21 HRS ABOVE MOTOR. REMOVE LOWER CHECKS. 07:30 - 08:00 0.50 DRILL P PROD1 WEEKLY FUNCTION BOPS FROM OPS CAB ANn KC1fMEY I INIT 08:00 - 09:00 1.00 DRILL P PROD1 STAB COIL. TEST TOOLS. GET ON WELL. PT QUICK TEST SUB 250/3500 PSI. FLOW TEST AGITATOR AT 300'. FUNCTION NORMAL. 09:00 - 11:30 2.50 DRILL P PROD1 RUN IN HOLE. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 11 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM 1 Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 11:30 - 12:15 0.75 DRILL P PROD1 LOG GR TIE IN FROM 9575'. SUBTRACT-19' CORRECTION. I RECORD SLOW PUMP RATES: #1 1.5/0.5 BPM: 1735/1215 PSI #2 1.5/0.5 BPM: 1730/1205 PSI. 12:15 - 14:45 2.50 DRILL P PROD1 RUN IN OPEN HOLE. TIGHT SHALE INTERVAL STARTING AT 10,705'. WORK DON TO 11,130'. REAM AND BACK REAM SECTION DOWN TO 11,150. PULLING UP TO 70K3. PUMP PRESSURS UP TO 3250 PSI AT 2.7 BPM IN. BECOME STUCK AT 11,130'. RELAX HOLE. PULL THROUGH. CONTINUE TO DRAG FROM 11,130'BACK UP HOLE TO 10,620'. CONTINUE TO PULL UP INTO 4-1/2"LINER WINDOW AT 9621'MD. HOLE HAS REALLY DETERIORATED SINCE PREVIOUS WIPER TRIP. 14:45 - 17:30 2.75 I DRILL N DPRB 11,200.00 PROD1 CIRCULATE INSIDE LINER WINDOW. CALL TOWN TO DISCUSS OPTIONS OF WEIGHTING UP AND/OR SETTING BILLET. ASSET AND GEOS EVALUATING SIDETRACK OPTION. CALL FOR MUD PRODUCT TO BE DELIVERED TO RIG. BEGIN MIXING KCL TO INCREASE MUD WT FROM 8.6 TO 9.5 PPG. 17:30 - 19:00 1.50 DRILL N DPRB 11,200.00 PROD1 TRIP IN HOLE FROM LINER WINDOW AT 9621' MD TO 10200'MD. WASH ACROSS PROPOSED BILLET SETTING DEPTH AT 110185'MD 3 TIMES. PULL OUT OF HOLE FROM 10200'MD TO LINER WINDOW AT 9621' MD. 19:00 00:00 5.00 DRILL N DPRB 11,200.00 PROD1 I CIRCULATE INSIDE 4-1/2"LINER WINDOW WHILE WEIGHTING UP ACTIVE MUD SYSTEM FROM 8.7 PPG TO 9.5 PPG(TO CONTROL SHALES);2-3 BPM,2025-2900 PSI WITH EDC PORTS OPEN. 2/26/2012 00:00 - 01:00 1.00 DRILL N DPRB 11,150.00 PROD1 CONTINUE TO WEIGHT UP ACTIVE MUD SYSTEM FROM 8.7 PPG TO 9.5 PPG WHILE CIRCULATING INSIDE 4-1/2"LINER WINDOW AT 9621'MD. 2.8 BPM=3800 PSI,10.7 PPG ECD IN. 01:00 - 02:00 1.00 DRILL N DPRB 11,200.00 PROD1 TRIP IN HOLE FROM WINDOW AT 9621'MD TO 10200'MD(PLANNED SIDETRACK DEPTH= 10185'MD). CIRCULATE OUT OLD 8.7 PPG MUD UNTIL MW IN=MW OUT=9.5 PPG. 2.5 BPM,3300 CIRCULATING PSI,10.7 PPG ECD. SLOW PUMP RATES AT 10200'MD,9.5 PPG MW: -MP#1: 2.5 BPM=3318 PSI,1 BPM=1509 PSI,0.5 BPM= 1208 PSI -MP#2: 2.5 BPM=3285 PSI,1 BPM=1447 PSI,0.5 BPM=1183 PSI Printed 3/19/2012 11:31:22AM North America-ALASKA- BP Page 12 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date: 2/29/2012 X3-011 K0-C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:30 2.50 DRILL N DPRB 11,200.00 PROD1 TRIP OUT OF HOLE FROM 10200'MD TO WINDOW AT 9621'MD.CHECK FOR FLOW. WELL STATIC. OPEN EDC. TRIP OUT OF HOLE FROM WINDOW TO BHA AT 90'MD;3 BPM,2650 PSI. FLOW CHECK WELL AT BHA. WELL STATIC. 04:30 - 05:30 1.00 DRILL N DPRB 11,200.00 PROD1 UNSTAB INJECTOR FROM WELL. BLOWDOWN TOOLS AND LAYDOWN BHA. 05:30 - 06:00 0.50 DRILL N DPRB 11,200.00 PROD1 MU AND TEST DF CHECKS. 06:00 - 06:30 0.50 DRILL N DPRB 11,200.00 PROD1 CREW CHANGE. DISCUSS OPS AND RIG STATUS. MAKE EQUIPMENT CHECKS AND ROUNDS. CONTINUE TO TEST DFCV'S _ 06:30 - 09:00 2.50 STWHIP N DPRB 11,200.00 PROD1 CONTINUE TO TEST DFCV'S. FIRST TWO SETS DID NOT PASS. THIRD SET PASSED 250/3500 PSI 5 MIN TESTS. 09:00 - 11:00 2.00 STWHIP N DPRB 11,200.00 PROD1 MU I3TTAI,UIJINUM BILLET WITH OPEN HOLE ANCHOR ON INTEQ MWD TOOLS. INCLUDEOR1ENTER. SCRIBE ANCHOR HS SLIPS TO HOT HIGH SIDE ORIENTATION. STAB COIL. TEST TOOLS. GET ON WELL. TEST QUCIK TEST SUB TO 250/3500 PSI FOR • 5 MIN EACH. 11:00 - 13:30 2.50 STWHIP j N DPRB 11,200.00 PROD1 RUN IN HOLE LIMIT RUNNING SPEED TO 50 FPM. 20 FPM IN JEWELRy 13:30 - 14:00 0.50 STWHIP N DPRB 11,200.00 PROD1 LOG GR TIE IN FROM 9575'. SUBTRACT 20' CORRECTION. 14:00 - 14:30 0.50 STWHIP N DPRB 11,200.00 PROD1 RUN IN OPEN HOLE. CLOSE EDC SLIGHT BOBBLE AT WINDOW. 48K#UP WT,19K#DN WT AT 10150'. 14:30 - 15:00 0.50 STWHIP N DPRB 11,200.00 PROD1_WITH TOP OF BILLET AT 10,185', PU COIL TO UP WT. PRESSURE COIL TO 3700 PSI. ANCHOR SET. SET DN 3.2K#ON DHWOB SENSOR. BILLET IN PLACE. DOUBLE SLIPS ORIENTED 30 DEG LEFT OF HIGH SIDE.TRIPLE SLIPS 180 DEG OPPOSITE. 15:00 - 19:00 4.00 STWHIP N DPRB 11,200.00 PROD1 PULL OUT OF OPEN HOLE AT 20 FPM. THROUGH WINDOW OK. FLOW CHECK. CIRCULATE OUT OF HOLE WITH BILLET SETTING BHA TO SURFACE. CHECK FOR FLOW PRIOR TO PULLING BHA INTO STACK. WELL STATIC. • • LAYDOWN BHA. UNSTAB INJECTOR FROM WELL AND SETBACK. 19:00 - 21:00 2.00 STWHIP N DPRB 11,200.00 PROD1 PERFORM SLACK MANAGEMENT. CUT 50' 2-3/8"COIL. CUT 20'E-LINE. INSTALL COIL CONNECTOR AND PULL TEST TO 35 KLBS. 21:00 - 00:00 3.00 STWHIP N DPRB 11,200.00 PROD? MAKEUP QUICK CONNECTS. PUMP E-LINE SLACK FORWARD. INSTALL AND PRESSURE TEST DFCVS TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH. Printed 3/19/2012 11:31:22AM North America-ALASKA- BP Page 13 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/27/2012 00:00 - 02:00 2.00 STWHIP N DPRB 11,200.00 PROD1 HOLD PJSM. MAKEUP4-1/4"DIRECTIONAL ASSEMBLY. STAB ON INJECTOR AND PRESSURE TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH FOR FIVE MIN EACH. -4-1/4"X 3-3/4"HUGHES BI-CENTER BIT -BAKER 2-7/8"ULTRA LOW SPEED 1.1 DEG BENT HOUSING MOTOR MWD TOOLS OVERAL BHA LENGTH=81' 02:00 - 04:00 2.00 STWHIP N , DPRB 11,200.00 , PROD1 TRIP IN HOLE FROM 81'MD TO 10175'MD. TIE-INTO 18IBESTOCK RA TAG AT 9631'I� - (-19.5'CORRECTION). SHUT OFF PUMPS AND CONTINUE IN HOLE FROM 10175'MD TO TAG UP ON BILLET AT 10185'MD. SLOW PUMP RATES AT 10175'MD,9.5 PPG: -MP#1: 0.5 BPM= 1143 PSI,1 BPM= 1390 PSI -MP#2: 0.5 BPM= 1135 PSI,1 BPM= 1388 PSI 04:00 - 06:00 2.00 STWHIP N DPRB 11,200.00 PROD1 CONFIRM ORIENTATION OF MOTOR AT 30 DEG LEFT OF HIGHSIDE AND BEGIN MILLING ON OPENHOLE BILLET AT 1 FPH TO KICKOFF OPENHOLE SIDETRACK;2.9 BPM,3150 PSI (100 PSI DIFFERENTIAL),0-1 KLBS WOB. MW IN=MW OUT=9.5 PPG. 10.7 PPG ECD. NO LOSSES TO FORMATION. 06:00 - 06:30 0.50 STWHIP N DPRB 11,200.00 PROD1 CREW CHANGE. DISCUSS OPERATIONS AND RIG STATUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE TO TIME MILL SIDETRACK OFF OF BILLET. 06:30 - 08:15 1.75 STWHIP iV DPRB 11,200.00 PROD1 TIME DRILL AT 10,188.6'. , 3080 PSI FS AT 2.83 BPM IN/OUT. 19K#DN WT. RECORD SLOW PUMP RATES: #1:0.5/1.0 BPM: 1150/1400 PSI #2:0.5/1.0 BPM: 1145/1395 PSI MILL/DRILL AHEAD TO 10,195'. SHOULD BE OFF BILLET AND PAST ANCHOR. 08:15 - 11:30 I 3.25 DRILL N DPRB 11,200.00 PROD1 DRILL AHEAD FROM 10,195' 3080 PSI FS AT 2.83 BPM IN/OUT. 200-300 PSI MTR WORK. 12.0 K#DHWOB. BHP/ECD/TFD:4845 PSI/10.8 PPG/8845' !IA/OA/PVT: 197 PSI/50 PSI/341 BBLS. !,MUD WT:9.57 PPG IN DRILL AHEAD TO 10,268'. ESTIMATED DOGLEG UP TO 24 DEG. NOTE: END OF 4-1/4"OPENHOLE IS 10268' _ !MD 11:30 - 13:45 2.25 DRILL N DPRB 11,200.00 PROD1 !WIPER TRIP TO WINDOW. OPEN EDC. CIRCULATE OUT OF HOLE. IHOLD BHA PJSM. AT SURFACE. JOG IN HOLE. FLOW CHECK WELL. WELL STATIC. Printed 3/19/2012 11:31:22AM North America-ALASKA- BP Page 14 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth' Phase Description of Operations (hr) (ft) 13:45 - 15:30 1.75 DRILL N DPRB 11,200.00 PROD1 GET OFF WELL. UNSTAB COIL. STAND 1 BACK BHA. BIT GRADED 1-1 TURNDOWN MOTOR FROM 1.1 DEG AKO TO 0.8 DEG AKO. HOLD KICK DRILL WITH AAR. 15:30 - 16:30 1.00 DRILL N SFAL 11,200.00 PROD1 TROUBLE SHOOT SLB PRESSURE GAUGE IN REEL HOUSE. 16:30 18:30 2.00 DRILL N DPRB 11,200.00 PROD1 CONTINUE TO MU BHA. STAB COIL. TEST TOOLS. GET ON WELL. TEST LUBRICATOR. 'BHA OVERALL LENGTH=81': ,U -USED 3-3/4"GAUGE HYCALOG -0.8 DEG BENT HOUSING MOTOR -MWD TOOLS b l� 18:30 - 21:15 2.75 DRILL N DPRB 11,200.00 PROD1 RUN IN HOLE FROM BHA AT 81'TO 9570'MD; 95 FPM,0.45 BPM PUMP RATE. TIE-IN TO TSAD GR SIGNATURE(-20'CORRECTION). CONTINUE IN HOLE FROM 9570'MD TO PREVIOUSLY DRILLED MD AT 10268'MD. USE CAUTION TRIPPING THROUGH WINDOW AND BILLET. NO ISSUES. SLOW PUMP RATES AT 10268'MD,9.6 PPG: -MP#1: 0.5 BPM= 1160 PSI,1 BPM= 1439 PSI -MP#2: 0.5 BPM= 1135 PSI,1 BPM= 1461 PSI 21:15 - 00:00 2.75 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10268'MD TO 10383'MD(115' IN 2.75 HRS=42 FPH);3 BPM,3400 PSI V FREESPIN,3550-3650 PSI CIRCULATING,1-3 IKLBS DOWNHOLE WOB,NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=9.6 PPG,10.8 PPG ECD. IA/OA= 345/165 PSI. NOTE: BUILD SECTION LANDED AT 10300' MD, 8673'TVD. 2/28/2012 00:00 - 00:30 0.50 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10383'MD AT MIDNIGHT TO 10403'MD. 00:30 - 01:15 0.75 DRILL N DPRB 11,200.00 PROD1 PERFORM PLANNED WIPER TRIP FROM 10403'MD TO 4-1/2"LINER WINDOW AT 9621' MD;2.7 BPM,3025 PSI,25 FPM. PICKUP WEIGHT OFF BOTTOM=46 KLBS. NO HOLE ISSUES. 01:15 - 03:45 2.50 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10403'MD TO 10544'MD(141' IN 2.5 HRS=56 FPH);2.9 BPM,3400 PSI FREESPIN,3550-3600 PSI CIRCULATING,1-3 KLBS DOWNHOLE WOB, NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=9.67 PPG,10.9 PPG ECD. IA/OA= 365/190 PSI. PERFORMED UNANNOUNCED KICK WHILE DRILLING DRILL AND HELD AAR WITH RIG CREW. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 15 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date: 2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay ' Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI: 500292157700 Active Datum:18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:45 - 05:00 1.25 DRILL N DPRB 11,200.00 PROD1 PERFORM PLANNED WIPER TRIP FROM 10544'MD TO 4-1/2"LINER WINDOW AT 9621' MD. PICKUP WEIGHT OFF BOTTOM=46 KLBS. NO HOLE ISSUES. 05:00 - 06:00 1.00 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10268'MD TO 10600'MD. 06:00 - 06:30 0.50 DRILL N DPRB 11,200.00 PROD1 CREW CHANGE. DISCUSS OPERATIONS AND RIG STAUS. MAKE INSIDE AND OUTSIDE ROUNDS. CONTINUE TO DRILL LATERAL FROM 10,600'. 06:30 - 07:00 0.50 DRILL N DPRB 11,200.00 PROD1 DRILL AHEAD FROM 10,656'. 3307 PSI FS AT 2.88 BPM IN/OUT. 200-300 PSI MTR WORK. 2-3K#DHWOB. BHP/ECD/TVD:4929 PSI/10.95 PPG/8669'. IA/OA/PVT:428 PSI/283 PSI/316 BBLS. DRILL TO 10,700'. 07:00 - 09:00 2.00 DRILL N DPRB 11,200.00 PROD1 WIPER TRIP TO WINDOW. 2950 PSI AT 2.6 BPM. PVT:316 BBLS. LOG GR TIE IN. SUBTRACT 6'CORRECTION. HOLE SMOOTH. SLOW PUMP RATES AT 10650'MD,9.6 PPG MUD: -MP#1: 0.5 BPM= 1219 PSI,1.5 BPM= 1847 PSI -MP#2: 0.5 BPM= 1190 PSI,1.5 BPM= 1890 PSI 09:00 - 10:45 1.75 DRILL N DPRB 11,200.00 PROD1 DRILL AHEAD FROM 10,700'. 3280 PSI FS AT 2.87 BPM IN/OUT. DRILL TO 10,850'. 10:45 - 12:30 1.75 DRILL N DPRB 11,200.00 PROD1 WIPER TRIP TO WINDOW. 3270 PSI AT 2.86 BPM. PVT:310 BBLS. 12:30 - 14:00 1.50 DRILL N DPRB 11,200.00 PROD1 DRILL FROM 10850 FT TO 10950 FT. 14:00 - 15:30 1.50 DRILL N DPRB 11,200.00 PROD1 TRY TO PICK UP CT AFTER LOSING MOTOR WORK. DIFFERENTIALLY STUCK ON BOTTOM. PUMP A BOTTOMS UP THEN SHUT DOWN PUMP, RELAX HOLE FOR 5 MIN. CYCLE PIPE 10K TO 80K 4 TIMES, NO LUCK. SEEING TENSION AND COMPRESSION ON DWOB WHEN CYCLING PIPE. ABLE TO TURN ORIENTER FREELY CALL FOR 50 BBLS MINERAL OIL. CIRCULATE ANOTHER 20 BBLS TO WARM UP CT. 15:30 - 15:45 0.25 DRILL N DPRB 11,200.00 PROD1 SHUT DOWN PUMP,RELAX HOLE FOR 15 MIN. CYCLE PIPE-8K TO 60K,PIPE IS FREE. 15:45 - 17:00 1.25 DRILL N DPRB 11,200.00 PROD1 PERFORM WIPER TRIP FROM 10950'MD TO 4-1/2"LINER WINDOW AT 9621'MD AND BACK TO BOTTOM. NO HOLE ISSUES. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 16 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date:2/29/2012 X3-011 K0-C:(2,173,801.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA 1 UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 19:45 2.25 DRILL N DPRB 11,200.00 PROD1 DISPLACE WELL FROM OLD 9.6 PPG POWERPRO TO NEW 9.5 PPG POWERPRO WHILE RECIRPCATING 300'-500'PIPE OFF BOTTOM;2.8 BPM,2950-3050 PSI. SLOW PUMP RATES AT 10950'MD,NEW 9.5 PPG MUD: -MP#1: 0.5 BPM=996 PSI,1 BPM=1241 PSI -MP#2: 0.5 BPM=1016 PSI,1 BPM=1260 PSI 19:45 - 21:30 1.75 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 10950'MD TO 11092'MD(142' IN 2 HRS=71 FPH);2.9 BPM,3100 PSI FREESPIN,3350-3450 PSI CIRCULATING,1-3 KLBS DOWNHOLE WOB,NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=9.5 PPG,11 PPG ECD. IA/OA=455/300 PSI. 21:30 - 23:30 2.00 DRILL N DPRB 11,200.00 PROD1 PERFORM PLANNED WIPER TRIP FROM 11092'MD TO 4-1/2"LINER WINDOW AT 9621' MD. NO HOLE ISSUES. 23:30 - 00:00 0.50 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11092'MD TO 11115'MD(23' IN 0.5 HRS=46 FPH); 2.9 BPM.3100 PSI I FREESPIN.3450-3550 PSI CIRCULATING,3-4 KLBS DOWNHOLE WOB, NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=9.5 PPG.10.9 PPG ECD. IA/OA= '425/275 PSI. 2/29/2012 00:00 - 01:00 1.00 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11115'MD TO 11186'MD(71' IN 1 HR=71 FPH);2.9 BPM.3150 PSI FREESPIN,3350-3550 PSI CIRCULATING,2-4 KLBS DOWNHOLE WOB, NO LOSSES TO FORMATION WHILE DRILLING. MW IN=MW OUT=9.5 PPG,11 PPG ECD. IA/OA=565/405 PSI. BOTTOMHOLE CIRCULATING TEMPERATURE =134 DEG F. 01:00 - 02:30 1.50 DRILL N DPRB 11,200.00 PROD1 UNABLE TO DRILL AHEAD DUE TO DIFFICULTY TRANSFERING WEIGHT TO BIT. MAKE SEVERAL 100'-400'WIPER TRIPS WITH NO SUCCESS. 02:30 - 04:30 2.00 DRILL N DPRB 11,200.00 PROD1 MAKE WIPER TRIP FROM 11186'MD TO 4-1/2" LINER WINDOW AT 9621'MD. NO HOLE ISSUES. 04:30 - 05:00 0.50 DRILL N DPRB 11,200.00 PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11187'MD TO 11200'MD. PUMP 20 BBL PILL OF NEW 9.5 PPG POWERPRO MUD WHILE DRILLING AHEAD. NOTE: END OF NPT BECAUSE 11200'MD WAS PREVIOUSLY DRILLED TO DEPTH IN 18-08 PB1. 05:00 - 06:00 1.00 DRILL P PROD1 DIRECTIONAL DRILL 3-3/4"LATERAL HOLE SECTION FROM 11200'MD TO 11205'MD. AT 11205 FT NO FURTHER PROGRESS IS MADE. POOH FOR AGITATOR. Printed 3/19/2012 11:31:22AM North America -ALASKA- BP Page 17 of 17 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:2/17/2012 End Date: 2/29/2012 X3-011 KO-C: (2,173,801.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM I Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 09:00 3.00 DRILL P PROD1 WHILE POOH,TD IS CALLED ON WELL. k ENOUGH CLEAN SAND HAS BEEN FOUND TO SATISFY SOR OBJECTIVES. PICK UP AND TIE-IN DEPTH. RUN BACK TO BOTTOM AND TAG AT 11210 FT, OFFICIAL TD. CLEAN PASS GOING BACK DOWN. 09:00 - 10:30 1.50 DRILL P PROD1 PULL WIPER TRIP BACK TO BILLET,THEN TO TD,CLEAN PASS UP AND DOWN. 10:30 - 12:00 1.50 DRILL P PROD1 PERFORM 5 MIN FLOW CHECK AT TD WHILE MOVING CT SLOWLY. GET SLOW PUMP PRESSURES THEN LAY IN LINER PILL WHILE POOH. 12:00 - 14:20 2.33 DRILL P PROD1 PULL THROUGH WINDOW AND POOH. FLAG PIPE AT 9200 FT,7600 FT EOP. 14:20 - 15:30 1.17 DRILL P PROD1 TAG STRIPPER AND FLOWCHECK WELL. TRIP SHEET IS-5 BBLS CUMULATIVE. L/D BHA. BIT IS 1-1, SLIGHT CHIP ON NOSE. END DRILLING EVENT AT 15:30 ON 2/29/2012. IBEGIN COMPLETION EVENT. Printed 3/19/2012 11:31:21AM North America-ALASKA- BP Page 1 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 KO-C: (1,209,667.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/29/2012 15:30 - 16:30 1.00 CASING P RUNPRD BEGING COMPLETION EVENT AT 15:30 ON 2/29/12. RIG UP TO PUMP SLACK FORWARD. PUMP 320 FT OF CABLE OUT OF THE CT. 16:30 - 18:30 2.00 CASING P RUNPRD PUT BALL CATCHER NOZZLE ON. LAUNCH 3/4"BALL AND PUMP IT AROUND. 18:30 - 19:30 1.00 CASING P RUNPRD REHEAD COIL WITH NEW CONNECTOR. PULL TEST TO 35 KLBS. LEAK TEST TO 4000 PSI. STANDBACK INJECTOR IN CIRCULATION HOLE ON RIG FLOOR. 19:30 - 20:30 1.00 CASING P RUNPRD RIG UP LINER RUNNING EQUIPMENT. HOLD PJSM FOR RUNNING LINER. 20:30 - 00:00 3.50 CASING P RUNPRD MAKEUP AND RUN IN HOLE WITH 2-7/8"X 3-1/4"PRODUCTION LINER FROM SURFACE TO 1170'MD AT MIDNIGHT(TOTAL LINER LENGTH= 1722'MD). CONFIRM FLOATS ARE HOLDING WHILE RUNNING PIPE IN HOLE. FILL PIPE EVERY 10 JOINTS. MAKEUP TORQUE FOR 2-7/8",6.4#, -80 LINER =900 FT-LBS. MAKEUP TORQUE FOR 3-1/4",6.6#, L-80 LINER=1200 FT-LBS. DRIFT THE FIRST FIVE JOINTS OF EACH SIZE PIPE TO CONFIRM PROPER MAKEUP TORQUE. PERFORM KICK WHILE TRIPPING DRILL AND AAR. CREW RESPONSE TIME TO SECURE WELL=<3 MIN. 3/1/2012 00:00 - 01:30 1.50 CASING P RUNPRD CONTINUE TO RUN IN HOLE WITH 2-7/8"X 3-1/4"PRODUCTION LINER FROM 1170'MD AT MIDNIGHT TO TOTAL LINER LENGTH AT 1722' MD. h 01:30 - 02:00 0.50 CASING P RUNPRD MAKEUP BAKER GEN II SELRT LINER RUNNING TOOLS WITH 4 JOINTS OF 2-3/8" PH6 PIPE TO ALLOW FOR E-LINE SLACK. 02:00 - 02:30 0.50 CASING P RUNPRD STAB ON INJECTOR AND PRESSURE TEST QUICK TEST SUB TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS). Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 2 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 KO-C: (1,209,667.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 04:45 2.25 CASING P RUNPRD RUN IN HOLE WITH LINER ON 2-3/8"COILED TUBING FROM 1722'MD TO LANDING DEPTH AT 11210'MD. NO HOLE ISSUES. PICKUP WEIGHT ON BOTTOM=48 KLBS, SLACKOFF= .16 KLBS. 0.5 BPM= 1200 PSI CIRCULATING PRESSURE. NO LOSSES TO FORMATION WHILE RUNNING LINER. 1ST FLAG AT 4-1/2"LINER WINDOW=-20' CORRECTION,PICKUP WEIGHT=47 KLBS,19 KLBS SLACKOFF. 2ND FLAG=-20'CORRECTION,TD=-20' CORRECTION(ALL DEPTHS MATCH FOR CORRECTED TD). CASED HOLE RUNNING LINER: PUMP TRIPS AT 1200 PSI,100 FPM RUNNING SPEED,0.5 I BPM,1150-1185 PSI CIRCULATING PRESSURE. OPENHOLE RUNNING LINER: PUMP TRIPS AT 1200 PSI,50 FPM,0.5 BPM,1185 PSI CIRCULATING PRESSURE. NOTES: TOP OF LINER AT 9488'MD,8270'TVD PBTD IS AT 11172'MD,8723'TVD LINER IS SET AT 11210'MD,8726'TVD HES X NIPPLE IS AT 9509'MD 04:45 - 05:30 0.75 CASING P RUNPRD PICKUP LINER 20'OFF BOTTOM TO 11190'MD TO POSITION COIL REEL FOR BALL DROP. ESTABLISH CIRCULATION AT 2 BPM,2090 PSI. ri PUMP 5 BBLS 9.5 PPG 2%KCL. DROP 5/8" STEEL BALL. LAUNCH BALL WITH 1500 PSI. CHASE WITH 5 BBLS 9.5 PPG 2%KCL. DISPLACE BALL WITH 40 BBLS 9.5 PPG I POWERPRO MUD AT 2.5 BPM,2450 PSI (HEAR BALL MOVING IN COIL REEL). SLOW RATE TO 0.75 BPM,1175 PSI AT 70%OF COIL REEL VOLUME. LAND BALL IN GENII SELRT SHEARABLE BALL SEAT AT 49 BBLS AWAY (REEL VOLUME=59.5 BBLS). PRESSURE UP TO 4300 PSI AND OBSERVE PRESSURE DROP(LINER RELEASE FROM RUNNING TOOLS). PICKUP 2'OVER STRING WEIGHT BREAKOVER. OBSERVE 10 KLBS LOSS IN STRING WEIGHT TO CONFIRM LINER RELEASED. NEW PICKUP WEIGHT=38 KLBS. SET BACK DOWN WITH 10 KLBS ON LINER. 05.30 - 06:00 0.50 CEMT N WAIT 11,210.00 RUNPRD CIRCULATE 9.5 PPG POWERPRO MUD AT 0.75 BPM,1320 PSI. WAIT ON CEMENTING TRUCKS(ALLOCATED TO GC-2 EMERGENCY FREEZE PROTECTING WORK). NO LOSSES TO FORMATION. 06:00 - 12:20 6.33 CEMT N WAIT 11,210.00 RUNPRD CONTINUE CIRCULATING MUD,WAIT ON CEMENT TRUCK AND CREW. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 3 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:20 - 14:30 2.17 CEMT P RUNPRD CEMENT CREW ARRIVES,START TO SWAP WELL OVER TO KCL. RIG UP CEMENT PUMP TRUCK. 14:30 - 17:00 2.50 CEMT P RUNPRD KCL CIRCULATED ALL THE WAY AROUND. EMPTY PITS 1,2 AND PREP TO MIX BIOZAN IN PITS 4,5 17:00 - 19:00 2.00 CEMT P RUNPRD MIX 100 BBLS 9.5 PPG 2%2 PPB BIOZAN PILL FOR CEMENT CONTAMINATION. CONTINUE TO CIRCULATE 9.5 PPG KCL DOWNHOLE AT 2 BPM,1500 PSI. 19:00 - 21:00 2.00 CEMT P RUNPRD PRESSURE TEST SCHLUMBERGER CEMENT LINES WITH 7 PPG MINERAL OIL TO 250 PSI LOW AND 6500 PSI HIGH FOR FIVE MIN EACH (PASSING TESTS). 21:00 - 21:30 0.50 CEMT P RUNPRD HOLD PRE-JOB SAFETY MEETING WITH ALL CREWS ON LOCATION FOR CEMENT JOB. CONTINUE TO CIRCULATE 9.5 PPG 2%KCL AT 1.5 BPM,1055 PSI. 21:30 - 22:30 1.00 CEMT P RUNPRD CLEANUP PUMP TRUCK AFTER PRESSURE _ ( TESTING WITH MINERAL OIL. 22:30 - 00:00 1.50 CEMT P RUNPRD LOAD 10 BBLS 9.5 PPG KCL FOR SPACER ONTO CEMENT TRUCK WITH SPECIAL CONSIDERATIONS FOR FLUID TRANSFERS IN -35 DEG F TEMPS. HEAT KCL TO 110 DEG F ION PUMP TRUCK FOR PUMPING THROUGH HARDLINE AHEAD OF CEMENT. 3/2/2012 00:00 - 01:30 1.50 CEMT P RUNPRD CONTINUE TO CIRCULATE 9.5 PPG KCL AT 1.5 BPM,1100 PSI. HEAT 10 BBL 9.5 PPG KCL SPACER TO PUMP AHEAD OF CEMENT. 01:30 - 01:45 0.25 CEMT P RUNPRD BATCH MIX 25 BBLS 15.8 PPG CLASS G CEMENT. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 4 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 01:45 - 03:30 1.75 CEMT P RUNPRD CEMENT 2-7/8"X 3-1/4"PRODUCTION LINER AT 11210'MD WITH 2-3/8"FLASH FREE COILED TUBING REEL(TOTAL REEL LENGTH = 15792')AS FOLLOWS: 01:45-SCHLUMBERGER PUMP 10 BBLS 100 DEG F 9.5 PPG KCL AS SPACER BETWEEN RESIDUAL MINERAL OIL FROM PRESSURE TEST AND CEMENT;1.5 BPM,1050 PSI. 01:55-ZERO MICROMOTION(MM)IN. N V SCHLUMBERGER PUMP 16.8 BBLS 15.8 PPG CLASS G CEMENT;2 BPM, INITIAL CIRCULATING PRESSURE(ICP)=1750 PSI, FINAL CIRC PRESSURE(FCP)=2995 PSI. 02:05-DISPLACE CEMENT WITH 9.5 PPG 2% KCL WITH 2 PPB BIOZAN. PUMP 43.2 BBLS UNTIL LEADING EDGE OF CEMENT IS AT SELRT TOOLS;2 BPM, ICP=3255 PSI, FCP= 1950 PSI. 02:30-AT 43.2 BBLS, DROP RATE TO 1 BPM, 150 PSI WHILE DISPLACING CEMENT THROUGH LINER. CEMENT REACHES LINER TAIL AT 54.7 BBLS AWAY. I ' 02:40-DISPLACE CEMENT UP BACKSIDE OF LINER FROM 54.7 BBLS AWAY TO 58 BBLS AWAY;1 BPM, ICP= 150 PSI, FCP=500 PSI. AT 58 BBLS AWAY,2 BBLS OF CEMENT REMAIN IN COILED TUBING ABOVE SELRT TOOLS. 02:45-PICKUP 13'ABOVE PICKUP WEIGHT TO EXPOSE SIDE EXHAUST PORTS. NO SIGN OF CEMENT U-TUBING. SET BACK DOWN WITH 10 KLBS(10'HIGHER THAN PREVIOUS DEPTH)TO RELEASE PEE-WEE DART. 02:50-PRESSURE UP BEHIND PEE-WEE DART WITH 850 PSI TO LATCH IT INTO LINER WIPER PLUG. PICKUP 2'ABOVE PICKUP WEIGHT TO EXPOSE SIDE EXHAUST PORTS. OBSERVE PRESSURE DROP TO 100 PSI. 02:55-PUMP 5 BBLS(2 BBLS CEMENT+3 BBLS BIOZAN KCL)OUT SIDE EXHAUST AT 1 BPM,430 PSI. OPEN BAKER CHOKE TO BLEED OFF COILED TBG PRESSURE. 02:58-RUN BACK IN HOLE 2'AND SET BACK DOWN WITH 10 KLBS. CLOSE BAKER CHOKE. 03:00-PRESSURE UP ON COILED TUBING TO 3450 PSI TO RELEASE LINER WIPER PLUG. PUMP 11.7 BBLS(CALCULATED=11.3 BBLS) UNTIL PLUG BUMPS;1.7 BPM, FCP=2600 PSI. 03:10-CEMENT IN PLACE-PRESSURE UP TO 3500 PSI BEHIND LINER WIPER PLUG AND Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 5 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) HOLD FOR ONE MIN. OPEN BAKER CHOKE TO BLEED OFF TUBING PRESSURE. CHECK FLOATS. FLOATS HOLDING. 03:15-CLOSE BAKER CHOKE AND PRESSURE UP ON COILED TUBING TO 700 PSI. PICKUP 3'TO EXPOSE SIDE EXHAUST PORTS. OBSERVE PRESSURE DROP OFF TO 0 PSI. CIRCULATE 5 BBLS ON TOP OF LINER AT 0.4 BPM NOTE: NO LOSSES TO FORMATION DURING JOB. TOP OF CEMENT PLAN=TOL AT 9488'MD TOP OF CEMENT BASED ON JOB DETAILS= TOL AT 9488'MD 03:30 - 06:30 3.00 CASING P RUNPRD PULL OUT OF HOLE AT 75 FPM, PUMPING 9.5 PPG KCL WITH BIOZAN REPLACING PIPE VOIDAGE+0.5 BPM TO CONTAMINATE ANY CEMENT IN COILED TUBING ANNULUS. CHECK FOR FLOW PRIOR TO PULLING BHA INTO BOP STACK. WELL STATIC. NO CEMENT OBSERVED IN RETURNS DURING TRIP OUT OF HOLE. 06:30 - 07:00 0.50 CASING P RUNPRD SHIFT CHANGE AND RIG WALKAROUNDS. 07:00 - 08:00 1.00 CASING P RUNPRD L/D BHA AND RECOVER 5/8"BALL. 10'OF E-LINE FOUND IN PH6 PIPE. TOOLS HAVE FUNCTIONED NORMALLY. 07:00-NOTIFY AOGCC REPRESENTATIVE JEFF JONES OF INTENTION TO TEST BOPE BEGINNING AT 07:00 ON 3/3/2012. MR.JONES REQUESTED A 2 HOUR CALLOUT NOTICE FOR TEST. 08:00 - 09:30 1.50 EVAL P OTHCMP M/U SAFETY JOINTS. PREP RIG FLOOR FOR RUNNING CSH. 09:30 - 11:30 2.00 EVAL P OTHCMP REVIEW RISK ASSESSMENT WITH ALL CREWS FOR RUNNING CSH. M/U BHA#13-MCNL BHA WITH 2.30"MILL, MUIUR. 11:30 - 12:15 0.75 EVAL P OTHCMP CONDUCT KICK WHILE TRIPPING DRILL. � P CREW PICKS UP SAFETY JOINT AND M/U, TORQUE WITH LITTLE JERKS AND RUN IT , 13 INTO THE WELL. EXERCISE IS ENDED WITH THE SAFETY JT ACROSS THE BOPS. TOTAL TIME TO PUT SAFETY JT IN A POSITION TO SHUT IN WELL IS 2.5 MIN. CONDUCT AAR FOR SAFETY JOINT DRILL. 12:15 - 16:30 4.25 EVAL P OTHCMP CONTINUE PICKING UP 1.25"CSH FROM DERRICK. RATTLE EVERY STAND WITH A HAMMER AND PUMP THROUGH THE STRING EVERY 10 STANDS. 16:30 - 17:00 0.50 EVAL P OTHCMP M/U CT RISER. PRESSURE TEST QTS TO 300 /3500 PSI,GOOD. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 6 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/26/2012 End Date:3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date i From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 19:00 2.00 EVAL P OTHCMP RUN IN HOLE FROM BHA AT 2177'MD TO 9520'MD(32'INSIDE LINER TOP AT 9488'MD); PUMP 1.6 BPM WHILE RIH,2375-2600 PSI. OBSERVE TWO SEPARATE INTERVALS OF 10 PPG FLUID IN RETURNS(INDICATIONS OF CEMENT FROM SIDE EXHAUST AND EXCESS OVER LINER TOP)WHILE TRIPPING IN HOLE. DIVERT RETURNS TO CUTTINGS BOX. 19:00 - 19:30 0.50 EVAL P OTHCMP PULL OUT OF HOLE FROM 9520'MD TO 9000' MD(BEGINNING DEPTH FOR LOGGING). 19:30 - 20:30 1.00 EVAL P OTHCMP LOG DOWN WITH GR/CCL/CNL TOOLS FROM 9000'MD TO PBTD AT 11201'MD (UNCORRECTED)AT 30 FPM,1.6 BPM,2630 PSI. NOTE: LINER TALLY PBTD= 11172'MD 20:30 - 21:30 1.00 EVAL P OTHCMP CIRCULATE PERF PILL DOWN COIL WHILE RECIPROCATING PIPE. 21:30 - 22:00 0.50 EVAL P OTHCMP START WITH STRING IN COMPRESSION ON LANDING COLLAR. PULL OUT OF HOLE, LOGGING WITH GR/CCL/CNL TOOLS. FROM 11201'MD TO 9000'MD(TOL AT 9488'..TSAG TIE-IN AT-9200'MD): 60 FPM,0.7 BPM IN,0.35 BPM OUT,450 PSI. PICKUP WEIGHT OFF BOTTOM=45 KLBS. SLACKOFF=21 KLBS. FLOW CHECK WELL AT 9000' MD(STATIC). NOTE: PAINT FLAG AT 11000'MD FOR PERFORATION RUN. 22:00 - 00:00 2.00 EVAL P - OTHCMP PULL OUT OF HOLE FROM 9000'MD TO BHA AT 2177'MD. FLOW CHECK WELL AT BOP STACK(STATIC). 3/3/2012 00:00 - 00:30 0.50 EVAL P OTHCMP HOLD PJSM FOR LAYING DOWN BHA AND HANDLING 1-1/4"CSH PIPE. UNSTAB INJECTOR AND STANDBACK ON RIG FLOOR. 00:30 - 02:00 1.50 EVAL P OTHCMP LAYDOWN CLEANOUT AND LOGGING BHA FROM 2177'MD TO 300'MD(NUCLEAR SOURCES IN BHA) DROP 1/2"STEEL BALL DOWN BHA TO CIRC SUB. PRESSURE UP BEHIND BALL 8.4 PPG WATER TO SHEER OPEN CIRC SUB AT 2300 PSI. ALLOW BHA TO U-TUBE WITH BACKSIDE 9.5 PPG KCL. BALL RECOVERED IN CIRC SUB WHEN OUT OF HOLE. RACKBACK STANDS OF 1-1/4"CS HYDRIL PIPE. .02:00 - 03:30 1.50 EVAL P OTHCMP HOLD PJSM WITH SLB LOGGING REPS. PULL OUT OF HOLE FROM 300'MD TO 70'MD. REMOVE NUCLEAR SOURCES FROM BHA. LAYDOWN SLB GR/CCL/CNL LOGGING TOOLS. 03:30 - 04:00 0.50 EVAL P OTHCMP LAYDOWN BHA FROM 70'MD TO SURFACE. FLUSH DEAD LEGS IN CHOKE MANIFOLD AND CLEAR RIG FLOOR AFTER TRIPPING. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 7 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:30 0.50 EVAL P ' OTHCMP INSTALL TREE CAP AND PRESSURE TEST(IN PREPARATION FOR LINER LAP PT) SLB LOGGERS DOWNLOAD DATA AND NORMALIZE GR/CCL/CNL OVER 10650'MD- 10750'MD CLEAN SAND INTERVAL. TIE-IN LOGS TO PDC LOG. DEPTH CORRECTION=-29.5' FINAL PBTD= 11171'MD(-1'FROM ORIGINAL PIPE TALLY) EOP FLAG NOW OFFICIALLY AT 10999'MD 04:30 - 06:00 1.50 EVAL P OTHCMP PRESSURE TEST 2-7/8"x 3-1/4"PRODUCTION L INFR I AP TO 250 PSI I OW(PASS)Ann?Ann PSI HIGH FOR 30 MIN(FAIL). PRESSURE UP TO 2400 PSI AND MONITOR. PRESSURE BLEEDS OFF TO 700 PSI IN 3 MIN. ESTABLISH INJECTION RATE-PUMP 4 BBLS AT 0.7 BPM,2030 PSI. LINER LAP TEST FAILS. v n WTL JIM WILLINGHAM INFORMED OF FAILED A. LINER LAP. 06:00 - 08:00 2.00 WHSUR P OTHCMP GET INDEPENDENT TEST OF SWAB AND MASTER VALVES TO PREP FOR REMOVING DOORS ON BOPS. 08:00 - 14:00 6.00 BOPSUR P OTHCMP PJSM THEN CONDUCT LO/TO OF KOOMEY UNIT. GREASE CHOKE VALVES. REMOVE BOP DOORS AND INSPECT RAMS. REPLACE UPPER 2-3/8"PIPE/SLIP RAM BLOCKS AND 1 UPPER P/S SEAL,AND BLADE SEAL ON BLIND/SHEARS. REPLACE DOORS ON BOP RAMS. 14:00 - 21:30 7.50 BOPSUR P OTHCMP PRESSURE TEST BOPE WITH 2-3/8"TEST JOINT TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH PER AOGCC AND ALASKA DWOP STANDARDS. STATE'S RIGHT VTO WITNESS TEST WAIVED BY AOGCC REP, JEFF JONES. ALL BOP STACK COMPONENTS FUNCTIONED FROM ALL CONTROL PANELS. NO COMPONENTS FAILURES DURING TESTS. (SEE ATTACHED CHARTS AND REPORTS). 21:30 - 22:00 0.50 BOPSUR P OTHCMP RIG DOWN AFTER BOPE TESTING. FILL HOLE(12 BBLS). 22:00 - 00:00 2.00 PERFOB P OTHCMP HOLD PJSM WITH SLB PERFORATING REPS AND RIG CREW. LOAD PIPE SHED WITH GUNS AND EQUIPMENT. CONFIRM GUN COUNT AND TALLIES. RIG UP PIPE HANDLING EQUIPMENT. 3/4/2012 00:00 - 00:15 0.25 PERFOB P OTHCMP HOLD PJSM FOR MAKING UP PERF GUNS. BARRICADE OFF CELLAR. 00:15 - 02:15 2.00 PERFOB P OTHCMP SCHLUMBERGER REPS ON LOCATION TO MAKE UP 35 TOTAL PERF GUNS(650')AND - RUN IN HOLE. 02:15 - 03:15 1.00 PERFOB P OTHCMP RUN IN HOLE WITH 1-1/4"CS HYDRIL PIPE FROM DERRICK AS PERFORATING WORKSTRING. CONDUCT KICK WHILE TRIPPING DRILL. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 8 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type: COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM I Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 103:15 - 06:15 3.00 PERFOB P OTHCMP TRIP IN HOLE FROM BHA AT 2083'MD TO PRODUCTION LINER TOP AT 9488'MD;70 FPM,0.4 BPM. 06:15 - 06:40 0.42 PERFOB P OTHCMP STOP AT FLAG AND CORRECT-28 FT TO 10875 FT. CONSISTENT WITH EARLIER CORRECTIONS. CONTINUE RIH SLOWLY. TAG PBTD AT 11162.8 FT. PICK UP AND REPEAT, SAME DEPTH. PBTD FROM LOGGING RUN WAS 11170.6 FT. 06:40 - 07:30 0.83 PERFOB P OTHCMP PICK UP TO CT WEIGHT AND DEPTH READS 11157 FT. THIS CORRECTION WILL BE MORE THAN 10 FT,CALL ODE AND DECIDE TO PULL BACK AND CORRECT TO FLAG ON THE UPSTROKE,HOW IT WAS PAINTED WHILE LOGGING. NO DEPTH CHANGE. RE-CHECK 1-1/4"CSH PIPE TALLY, FIND THAT THE AVERAGE JOINT LENGTH THAT WAS USED FOR THE PERF BHA WAS SKEWED BY PICKING UP MOST OF THE SHORT STANDS FOR THE PERF GUN RUN. PULL UP TO FLAG AND INPUT NEW BHA LENGTH AND EOP FLAG DEPTH,WHICH IS -17 FT CORRECTION. 07:30 - 09:30 2.00 PERFOB P OTHCMP RIH AND TAG PBTD AT 11146 FT. ERAD DEPTH IS ONLY 8 FT OFF FROM WHERE IT SHOULD BE. DISCUSS DEPTH DISCREPANCY WITH MEMORY LOGGER, SLB TCP,ODE AND CTD SUPT. DECISION IS MADE TO USE THE PLUGBACK 'TAG AS THE DEPTH REFERENCE,SINCE THE ERAD DEPTH AND THE INITIAL TAG ARE VERY CLOSE. 09:30 - 10:00 0.50 PERFOB P OTHCMP TAG PBTD AND CORRECT TO 11170.7 FT,+30 FT. PICK UP TO 2 FT BELOW SHOT DEPTH AND CONDUCT PJSM WITH NORDIC CREWS AND SLB TCP FOR GUN FIRING. 10:00 - 10:20 0.33 PERFOB P OTHCMP START PUMP CYCLE TO ACTIVATE FIRING HEAD. USE 2 DIFFERENT RATES 0.3 AND 1.4 BPM. 1ON THE LAST PUMP CYCLE LEAVE THE PUMP RUNNING AT 0.3 BPM. 10:20 - 10:50 0.50 I PERFOB P OTHCMP GOOD SHOT INDICATION FROM ACOUSTIC SENSOR AND FLUID LOSSES,AND 4K WEIGHT LOSS. CLOSE CHOKE TO BUILD WHP. INCREASE PUMP RATE TO 1.5 BPM,SLOW PULLING SPEED UNTIL WELL IS FULL. POOH HOLD 200-300 PSI WHP. KEEP PULLING SPEED<60 FT/MIN WHILE PERFORATED INTERVALS: 10270-10540 FT 10610-10990 FT Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 9 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/26/2012 End Date:3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.:NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft)_ 10:50 - 11:20 0.50 PERFOB P OTHCMP STOP AT 9400 FT AND SHUT DOWN PUMP, OPEN CHOKE FULLY. 30 MIN FLOW CHECK. TRIP SHEET TO THIS POINT IS-7 BBLS OVER PIPE DISPLACEMENT. AFTER 15 MIN PUMP 2 BBLS TO WARM UP CT. TAKES 1.6 BBLS TO FILL WELL. AFTER THE FINAL 15 MIN STILL NO FLOW. 11:20 - 13:00 1.67 PERFOB P OTHCMP FILL WELL WITH 1.4 BBLS. PUMP 1.0 BPM AND POOH. 13:00 - 13:30 0.50 PERFOB P OTHCMP TAG STRIPPER AND FLOW CHECK WELL. TRIP SHEET IS-7 BBLS SINCE THE INITIAL FLOW CHECK AT THE LINER TOP,-14 BBLS SINCE SHOTS FIRED. ERAD IS 0.8 FT WHEN TAGGED UP. PUMP 1.2 BBLS TO FILL WELL AND WARM UP 1 CT MIDWAY THROUGH THE FLOW CHECK. 13:30 - 14:00 0.50 PERFOB P OTHCMP SET INJECTOR BACK ON LEGS. INSTALL TIW VALVE IN BHA FOR NORDIC CREW CHANGE. 14:00 - 15:30 1.50 PERFOB P . OTHCMP REMOVE 2 JTS OF 2-3/8"PH6. REMOVE 15 STDS OF 1.25"CSH,LEAVING 5 STDS ABOVE THE GUNS. 15:30 - 15:50 0.33 PERFOB P OTHCMP PJSM WITH SLB TCP AND NORDIC CREW FOR PULLING PERF GUNS. BARRICADE OFF CELLAR. 15:50 - 16:00 0.17 PERFOB P OTHCMP PULL REMAINING 5 STDS OF CSH OUT AND 145 PERF GUNS. 16:00 - 18:30 2.50 PERFOB P I OTHCMP LAYDOWN PERFORATING GUNS. ALL SHOTS CONFIRMED TO HAVE FIRED. 18:30 - 20:30 2.00 PERFOB ` P OTHCMP 1CLEAR RIG FLOOR. LOWER PERFORATING !GUNS AND EQUIPMENT DOWN TO GROUND LEVEL. 20:30 - 21:30 1.00 WHSUR P POST MAKEUP CLEANOUT BHA W/CTC,STINGER, 'DUAL FLAPPER CHECK VALVES,AND JET NOZZLE. BHA OAL=9'. STAB ON INJECTOR AND PRESSURE TEST QUICK TEST SUB TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASS). MIRU LITTLE RED PUMP TRUCK. 21:30 - 22:30 1.00 WHSUR P POST TRIP IN HOLE WITH NOZZLE BHA FROM SURFACE TO 2500'MD.CIRCULATE AT 0.85 BPM,200 PSI. PRESSURE TEST LITTLE RED LINES TO 250 PSI LOW AND 2500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS). 22:30 - 23:30 1.00 WHSUR P POST LITTLE RED PUMP 43 BBLS DIESEL INTO COILED TUBING;1.8 BPM,1000 PSI,HEATING ON FLY TO 68 DEG F. RIG DISPLACE DIESEL TO NOZZLE. 23:30 - 00:00 0.50 WHSUR P POST PULL OUT OF HOLE,LAYING IN 38 BBLS 6.8 PPG DIESEL TO FREEZE PROTECT 4-1/2", 12.6#TUBING FROM 2500'MD/TVD TO SURFACE. 5 BBLS DIESEL LEFT IN COIL FOR FREEZE PROTECTION DURING RIG MOVE. NOTE: THE CALCULATED OVERBALANCE TO THE FORMATION(7.3 PPG EMW AT 8725' TVD)IS 485 PSI WITH DIESEL AND 9.0 PPG 2%KCL IN TBG/LINER. Printed 3/19/2012 11:32:48AM North America -ALASKA- BP Page 10 of 10 Operation Summary Report Common Well Name: 18-08 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/26/2012 End Date: 3/5/2012 X3-011 K0-C: (1,209,667.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud Date/Time:4/6/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292157700 Active Datum: 18-08A @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 3/5/2012 00:00 - 01:00 1.00 WHSUR P POST MONITOR WELL AFTER FREEZE PROTECT. WELL STATIC. SET INJECTOR BACK IN STUMP. VALVE SHOP CREW ON LOCATION TO GREASE TREE VALVES IN PREPARATION _ FOR TESTING. 01:00 - 01:30 0.50 WHSUR P POST SET 4"CAMERON TYPE H BPV WITH CS HYDRIL DRY ROD. 01:30 - 03:00 1.50 WHSUR P POST DRAIN BOP STACK AND PRODUCTION TREE. FILL TREE WITH METHANOL. PRESSURE TEST MASTER AND SWAB VALVES INDIVIDUALLY TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS). CLOSE SURFACE SAFETY VALVE. 03:00 - 05:30 2.50 BOPSUR P POST LO/TO ACCUMULATOR UNIT. OPEN DOORS ON STACK AND INSPECT FOUR RAM COMPONENTS(ALL COMPONENTS VISUALLY ACCEPTABLE). CHANGE OUT BLIND RAM BLADE SEALS PROACTIVELY. i 05:30 - 06:00 0.50 BOPSUR . P POST RIG DOWN LUBRICATOR. V 06:00 - 09:30 3.50 RIGD P POST CLEANOUT PITS. PERFORM REPAIR WORK INSIDE PITS#1,2. 09:30 - 12:00 2.50 BOPSUR P POST NIPPLE DOWN BOPS. BLOW DOWN CHOKE MANIFOLD AND FLOWBACK TANK LINE. 12:00 - 13:00 1.00 WHSUR P POST INSTALL TREE CAP AND PRESSURE TEST WITH DIESEL TO 370 PSI LOW AND 4200 PSI HIGH FOR FIVE MIN EACH(PASSING). 13:00 - 14:00 1.00 RIGD P POST PREPARE TO MOVE RIG. WELLWORK TRANSFER PERMIT CLOSED OUT WITH DRILLSITE OPERATOR. WELL HANDOFF COMPLETED TO WELLS GROUP. i I I'I ALL TREE AND WELLHEAD VALVES CLOSED TO PRESSURE GAUGES. FINAL T/I/O PRESSURES=0/15/35 PSI. ***RELEASE RIG AT 14:00. ALL FURTHER ENTRIES FOR 3/5/2012 ON WELL 18-15. *** Printed 3/19/2012 11:32:48AM North America - ALASKA - BP Prudhoe Bay PB DS 18 18-08 - Slot 08 500292157700 18-08B Survey: MWD Survey Report - Geographic 02 March, 2012 BAKER HUGHES INTEQ Vii,71i � - �>> 3 Mai B R by Survey Report Geographic HUGHES 1 INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Well: 18-08 North Reference: True Wellbore: 18-08B Survey Calculation Method: Minimum Curvature Design: 18-08B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44 ft Longitude: 148°26'55.555 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-08 API No. 500292157700 Well Position +N/-S 0.00 ft Northing: 5,961,257.55 ft Latitude: 70°17'55.390 N +El-W 0.00 ft Easting: 691,439.32 ft Longitude: 148°26'58.236 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 16.00 ft Wellbore 18-08B API No 500292157702 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 2/20/2012 21.25 81.04 57,668 Design 18-08B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,182.34 Vertical Section: Depth From(ND) +NI-S +E/-W Direction (ft) (ft) (ft) (0) -16.00 0.00 0.00 0.00 Survey Program Date: 2/29/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,600.00 Gyrodata Gyro(18-08A) GYD-CT-CMS Gyrodata cont.casing m/s 9,620.50 10,182.34 MWD(18-08BPB1) MWD MWD-Standard 10,186.00 11,210.00 MWD(18-08B) MWD MWD-Standard 3/2/2012 8:34:51AM Page 2 COMPASS 2003.16 Build 73 NM B• 0 by Survey Report-Geographic UGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Well: 18-08 North Reference: True Wellbore: 18-08B Survey Calculation Method: Minimum Curvature Design: 18-08B Database: EDM.16-ANC Prod-WH24P Survey Measured TVD Below Map Map Depth Inclination Azimuth System +N/-S +El-W Northing Easting j (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,182.34 75.09 285.29 8,662.47 -307.58 -4,273.08 5,960,841.24 687,175.71 70°17'52.353 N 148°29'2.796 W TIP 10,186.00 75.40 285.79 8,663.40 -306.63 -4,276.49 5,960,842.10 687,172.28 70°17'52.362 N 148°29'2.895 W KOP 10,217.87 82.84 282.98 8,669.41 -298.87 -4,306.79 5,960,849.08 687,141.80 70°17'52.438 N 148°29'3.779 W 10,246.46 86.10 280.94 8,672.17 -292.98 -4,334.62 5,960,854.27 687,113.82 70°17'52.496 N 148°29'4.590 W 10,274.76 88.25 277.53 8,673.56 -288.44 -4,362.51 5,960,858.09 687,085.82 70°17'52.540 N 148°29'5.403 W 10,308.64 91.29 272.88 8,673.70 -285.37 -4,396.24 5,960,860.30 687,052.03 70°17'52.570 N 148°29'6.386 W 10,338.95 90.92 269.81 8,673.12 -284.66 -4,426.53 5,960,860.24 687,021.73 70°17'52.577 N 148°29'7.270 W 10,369.25 90.37 265.61 8,672.77 -285.87 -4,456.80 5,960,858.26 686,991.51 70°17'52.565 N 148°29'8.152 W 10,398.81 90.80 262.62 8,672.47 -288.90 -4,486.20 5,960,854.48 686,962.20 70°17'52.535 N 148°29'9.009 W 10,428.59 91.35 259.61 8,671.91 -293.50 -4,515.61 5,960,849.13 686,932.91 70°17'52.490 N 148°29'9.866 W 10,458.83 90.52 257.42 8,671.42 -299.52 -4,545.24 5,960,842.36 686,903.45 70°17'52.430 N 148°29'10.730 W 10,490.49 90.77 254.43 8,671.06 -307.22 -4,575.95 5,960,833.88 686,872.95 70°17'52.355 N 148°29'11.625 W 10,518.47 90.52 251.59 8,670.75 -315.39 -4,602.70 5,960,825.03 686,846.42 70°17'52.274 N 148°29'12.404 W 10,553.57 90.43 247.97 8,670.46 -327.52 -4,635.63 5,960,812.07 686,813.81 70°17'52.155 N 148°29'13.364 W 10,583.57 89.75 245.34 8,670.41 -339.41 -4,663.17 5,960,799.48 686,786.58 70°17'52.037 N 148°29'14.167 W 10,616.01 90.43 242.27 8,670.36 -353.72 -4,692.28 5,960,784.43 686,757.85 70°17'51.896 N 148°29'15.015 W 10,648.93 91.47 239.28 8,669.81 -369.79 -4,721.00 5,960,767.64 686,729.55 70°17'51.738 N 148°29'15.852 W 10,679.29 89.82 239.00 8,669.47 -385.36 -4,747.06 5,960,751.41 686,703.90 70°17'51.585 N 148°29'16.611 W 10,719.12 91.38 243.82 8,669.05 -404.42 -4,782.02 5,960,731.47 686,669.44 70°17'51.397 N 148°29'17.630 W 10,748.87 91.75 248.11 8,668.24 -416.53 -4,809.17 5,960,718.67 686,642.60 70°17'51.278 N 148°29'18.421 W 10,779.12 91.20 251.57 8,667.46 -426.95 -4,837.55 5,960,707.53 686,614.49 70°17'51.175 N 148°29'19.248 W 10,808.97 90.46 257.16 8,667.03 -434.99 -4,866.28 5,960,698.77 686,585.98 70°17'51.096 N 148°29'20.086 W 10,838.95 90.21 260.45 8,666.85 -440.81 -4,895.69 5,960,692.20 686,556.73 70°17'51.039 N 148°29'20.943 W 10,868.85 90.83 262.24 8,666.58 -445.31 -4,925.25 5,960,686.95 686,527.30 70°17'50.994 N 148°29'21.804 W 10,899.05 90.03 263.71 8,666.36 -449.00 -4,955.22 5,960,682.49 686,497.44 70°17'50.958 N 148°29'22.678 W 10,928.81 91.32 267.71 8,666.01 -451.22 -4,984.89 5,960,679.51 686,467.84 70°17'50.936 N 148°29'23.542 W 10,958.62 90.83 271.30 8,665.45 -451.48 -5,014.68 5,960,678.50 686,438.06 70°17'50.933 N 148°29'24.411 W 10,988.65 93.10 276.77 8,664.42 -449.37 -5,044.61 5,960,679.84 686,408.09 70°17'50.953 N 148°29'25.283 W 11,018.74 89.85 279.47 8,663.64 -445.12 -5,074.38 5,960,683.33 686,378.22 70°17'50.995 N148°29'26.151 W 11,048.37 89.48 283.81 8,663.81 -439.15 -5,103.39 5,960,688.57 686,349.07 70°17'51.054 N 148°29'26.997 W'' 11,078.66 87.51 286.75 8,664.61 -431.17 -5,132.60 5,960,695.80 686,319.67 70°17'51.132 N 148°29'27.849 W 11,108.84 87.08 290.63 8,666.04 -421.51 -5,161.15 5,960,704.73 686,290.88 70°17'51.227 N 148°29'28.681 W 11,128.87 87.18 292.67 8,667.04 -414.13 -5,179.74 5,960,711.63 686,272.11 70°17'51.299 N 148°29'29.223 W 11,148.41 86.56 295.16 8,668.11 -406.22 -5,197.58 5,960,719.08 686,254.08 70°17'51.377 N 148°29'29.743 W 11,210.00 86.56 295.16 8,671.80 -380.08 -5,253.22 5,960,743.79 686,197.79 70°17'51.634 N 148°29'31.366 W', TD I Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 10,182.34 8,662.47 -307.58 -4,273.08 TIP 10,186.00 8,663.40 -306.63 -4,276.49 KOP 11,210.00 8,671.80 -380.08 -5,253.22 TD Checked By: Approved By: Date: 3/2/2012 8:34:51AM Page 3 COMPASS 2003.16 Build 73 1 Qbp North America - ALASKA - BP Prudhoe Bay PBDS18 18-08 - Slot 08 500292157700 18-08BPB1 Design: 18-08BPB1 Survey Report - Geographic 02 March, 2012 ISM BAKER HUGHES INTEQ E ,,, L 91 - Mill 0 by Survey Report-Geographic HUGHESBAKR 04 INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Well: 18-08 North Reference: True Wellbore: 18-08BPB1 Survey Calculation Method: Minimum Curvature Design: 18-08BPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N I From: Map Easting: 691,583.44 ft Longitude: 148°26'55.555 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-08 API No. 500292157700 Well Position +N/-S 0.00 ft Northing: 5,961,257.55 ft Latitude: 70°17'55.390 N +E/-W 0.00 ft Easting: 691,439.32 ft Longitude: 148°26'58.236 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 16.00 ft Wellbore 18-08BPB1 API No 500292157771 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2011 2/20/2012 21.25 81.04 57,668 Design 18-08BPB1 Audit Notes: I I Version: Phase: ACTUAL Tie On Depth: 9,600.00 Vertical Section: TVD From Depth +N/-S +E/-W Direction p (TVD) (ft) (ft) (ft) (') -16.00 0.00 0.00 265.91 Survey Program Date: 2/28/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,600.00 Gyrodata Gyro(18-08A) GYD-CT-CMS Gyrodata cont.casing m/s 9,620.50 11,200.00 MWD(18-08BPB1) MWD MWD-Standard 3/2/2012 8:38:25AM Page 2 COMPASS 2003.16 Build 73 //%11 BA• 0 bp Survey Report-Geographic HUGHES INTEQ INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Well: 18-08 North Reference: True Wellbore: 18-08BPB1 Survey Calculation Method: Minimum Curvature Design: 18-08BPB1 Database: EDM.16-ANC Prod-WH24P Survey 1 Measured TVD Below Map Map Depth Inclination Azimuth System +N/-S +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,600.00 25.75 267.93 8,308.64 -244.27 -3,856.41 5,960,915.13 687,590.61 70°17'52.978 N 148°28'50.651 W TIP 9,620.50 20.48 267.93 8,327.48 -244.57 -3,864.45 5,960,914.64 687,582.58 70°17'52.975 N 148°28'50.885 W KOP 9,651.00 21.08 267.51 8,356.00 -245.00 -3,875.26 5,960,913.93 687,571.78 70°17'52.970 N 148°28'51.200 W 9,676.42 25.12 267.15 8,379.38 -245.46 -3,885.22 5,960,913.21 687,561.84 70°17'52.966 N 148°28'51.491 W I 9,707.08 28.31 258.38 8,406.77 -247.25 -3,898.85 5,960,911.07 687,548.26 70°17'52.948 N 148°28'51.888 W 1 9,736.96 31.30 254.54 8,432.70 -250.75 -3,913.27 5,960,907.21 687,533.93 70°17'52.914 N 148°28'52.309 W 9,767.09 37.38 255.08 8,457.57 -255.20 -3,929.67 5,960,902.35 687,517.65 70°17'52.870 N 148°28'52.786 W 9,797.35 42.91 253.47 8,480.69 -260.50 -3,948.44 5,960,896.57 687,499.03 70°17'52.818 N 148°28'53.333 W 9,826.60 47.65 249.50 8,501.27 -267.12 -3,968.12 5,960,889.45 687,479.52 70°17'52.752 N 148°28'53.907 W 9,852.39 51.55 247.58 8,517.98 -274.31 -3,986.39 5,960,881.79 687,461.44 70°17'52.681 N 148°28'54.440 W 9,884.93 56.33 245.32 8,537.13 -284.83 -4,010.49 5,960,870.66 687,437.62 70°17'52.578 N 148°28'55.142 W 9,912.67 59.19 249.49 8,551.93 -293.83 -4,032.15 5,960,861.12 687,416.20 70°17'52.489 N 148°28'55.773 W 9,942.18 60.71 253.24 8,566.71 -301.98 -4,056.35 5,960,852.35 687,392.22 70°17'52.409 N 148°28'56.478 W 9,972.38 61.55 257.33 8,581.30 -308.70 -4,081.92 5,960,844.99 687,366.83 70°17'52.343 N 148°28'57.224 W 10,002.41 61.19 262.07 8,595.69 -313.41 -4,107.84 5,960,839.62 687,341.03 70°17'52.296 N 148°28'57.979 W I 10,032.36 62.03 264.38 8,609.94 -316.51 -4,134.00 5,960,835.85 687,314.96 70°17'52.266 N 148°28'58.742 W!, 10,062.32 66.13 266.80 8,623.03 -318.58 -4,160.86 5,960,833.10 687,288.17 70°17'52.245 N148°28'59.525 W 10,092.57 69.55 270.70 8,634.44 -319.17 -4,188.86 5,960,831.79 687,260.19 70°17'52.239 N 148°29'0.341 W 10,122.34 70.43 275.36 8,644.64 -317.69 -4,216.78 5,960,832.56 687,232.24 70°17'52.254 N 148°29'1.155 W 10,152.38 72.67 279.99 8,654.15 -313.88 -4,245.01 5,960,835.65 687,203.93 70°17'52.291 N 148°29'1.978 W 10,182.34 75.09 285.29 8,662.47 -307.58 -4,273.08 5,960,841.24 687,175.71 70°17'52.353 N 148°29'2.796 W 10,212.32 77.63 289.33 8,669.54 -298.91 -4,300.89 5,960,849.20 687,147.69 70°17'52.438 N 148°29'3.607 W 10,242.19 81.74 292.88 8,674.89 -288.32 -4,328.29 5,960,859.08 687,120.03 70°17'52.542 N 148°29'4.406 W 10,272.55 85.17 297.95 8,678.35 -275.38 -4,355.52 5,960,871.32 687,092.48 70°17'52.669 N 148°29'5.200 W 10,302.08 87.97 302.22 8,680.12 -260.61 -4,381.01 5,960,885.44 687,066.62 70°17'52.814 N 148°29'5.943 W 10,331.96 90.28 304.46 8,680.58 -244.19 -4,405.97 5,960,901.22 687,041.26 70°17'52.975 N 148°29'6.671 W 10,361.45 92.27 305.19 8,679.92 -227.35 -4,430.17 5,960,917.43 687,016.64 70°17'53.141 N 148°29'7.377 W 10,392.53 92.94 303.88 8,678.51 -209.75 -4,455.75 5,960,934.37 686,990.62 70°17'53.314 N 148°29'8.122 W 10,422.38 92.61 300.54 8,677.06 -193.86 -4,480.97 5,960,949.61 686,965.00 70°17'53.470 N 148°29'8.858 W 10,452.80 92.98 297.19 8,675.58 -179.20 -4,507.58 5,960,963.59 686,938.03 70°17'53.614 N 148°29'9.634 W 10,482.62 93.37 292.83 8,673.93 -166.61 -4,534.55 5,960,975.49 686,910.75 70°17'53.738 N 148°29'10.420 W 10,512.94 93.50 289.30 8,672.11 -155.74 -4,562.79 5,960,985.64 686,882.24 70°17'53.844 N 148°29'11.244 W I 10,542.80 92.39 285.40 8,670.57 -146.85 -4,591.25 5,960,993.80 686,853.57 70°17'53.932 N 148°29'12.073 W 10,572.28 92.27 280.99 8,669.38 -140.12 -4,619.92 5,960,999.79 686,824.74 70°17'53.998 N 148°29'12.909 W I 10,601.79 92.49 276.81 8,668.15 -135.56 -4,649.04 5,961,003.61 686,795.51 70°17'54.042 N 148°29'13.758 W 10,632.45 92.03 271.61 8,666.94 -133.32 -4,679.58 5,961,005.08 686,764.92 70°17'54.064 N 148°29'14.649 W 10,662.48 91.84 267.60 8,665.92 -133.52 -4,709.59 5,961,004.11 686,734.93 70°17'54.062 N 148°29'15.523 W 10,692.70 93.04 263.87 8,664.64 -135.77 -4,739.69 5,961,001.10 686,704.90 70°17'54.040 N 148°29'16.401 W 10,722.13 91.41 260.53 8,663.49 -139.76 -4,768.82 5,960,996.36 686,675.88 70°17'54.000 N 148°29'17.250 W 10,753.70 91.47 255.51 8,662.70 -146.31 -4,799.69 5,960,989.03 686,645.20 70°17'53.936 N 148°29'18.150 W 10,783.50 91.78 251.08 8,661.86 -154.87 -4,828.21 5,960,979.75 686,616.90 70°17'53.851 N 148°29'18.981 W 10,813.50 90.64 247.00 8,661.22 -165.59 -4,856.21 5,960,968.31 686,589.18 70°17'53.746 N 148°29'19.797 W 10,843.78 89.66 241.85 8,661.14 -178.66 -4,883.52 5,960,954.55 686,562.22 70°17'53.617 N 148°29'20.593 W 10,873.94 89.66 235.58 8,661.32 -194.31 -4,909.28 5,960,938.25 686,536.87 70°17'53.463 N 148°29'21.343 W 10,903.21 88.62 231.28 8,661.76 -211.75 -4,932.78 5,960,920.23 686,513.83 70°17'53.291 N 148°29'22.028 W 10,933.69 89.23 227.10 8,662.33 -231.66 -4,955.84 5,960,899.73 686,491.28 70°17'53.095 N 148°29'22.700 W 10,963.27 88.37 222.78 8,662.95 -252.59 -4,976.72 5,960,878.28 686,470.94 70°17'52.889 N 148°29'23.308 W 10,993.56 89.42 227.34 8,663.54 -273.97 -4,998.15 5,960,856.36 686,450.06 70°17'52.679 N 148°29'23.933 W 11,023.39 90.15 232.32 8,663.65 -293.21 -5,020.94 5,960,836.55 686,427.77 70°17'52.490 N 148°29'24.596 W 11,053.30 88.86 235.94 8,663.91 -310.73 -5,045.17 5,960,818.42 686,404.00 70°17'52.317 N 148°29'25.302 W 11,083.52 89.39 241.13 8,664.37 -326.50 -5,070.94 5,960,802.00 686,378.64 70°17'52.162 N 148°29'26.053 W 11,113.34 90.15 245.91 8,664.49 -339.79 -5,097.62 5,960,788.03 686,352.31 70°17'52.031 N 148°29'26.831 W 11 143.38 89.75 250.20 8,664.52 -351.01 -5,125.48 5,960,776.10 686,324.7570°17' 1. 2 N 14 °2 '27. 4 5 9 0 8 9 6 3 W 3/2/2012 8:38:25AM Page 3 COMPASS 2003.16 Build 73 eMTP h? Survey Report-Geographic HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Well: 18-08 North Reference: True Wellbore: 18-08BPB1 Survey Calculation Method: Minimum Curvature Design: 18-08BPB1 Database: EDM.16-ANC Prod-WH24P Survey l Measured TVD Below Map Map Depth Inclination Azimuth System +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,200.00 89.75 250.20 8,664.76 -370.19 -5,178.75 5,960,755.57 686,271.98 70°17'51.731 N 148°29'29.195 W TD — — f Casing Points WI Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 11,400.00 PRODUCTION LINER 1 2.875 3.750 fFormations Measured Vertical Dip Depth Depth Dip Direction (ft) (ft) Name Lithology (°) (°) 9,811.00 8,490.51 23SB 10,160.00 8,656.38 TDF Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 9,600.00 8,308.64 -244.27 -3,856.41 TIP 9,620.50 8,327.48 -244.57 -3,864.45 KOP 11,200.00 8,664.76 -370.19 -5,178.75 TD Checked By: Approved By: Date: 3/2/2012 8:38:25AM Page 4 COMPASS 2003.16 Build 73 Letter of Transmittal c7. - 13 BAKERDate: HUGHES March 30, 2012 To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): R-14B F-29BPB 1 F-29B F-31 APB 1 F-31A W-12AL1 18-15CPB1 18-15C 18-08BPB 1 18-08B Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: V. CJlr--J , State of Alaska AOGCC DATE: 3 J- 2,3c51.1- 1 ,t, ' sir ir/A:, I SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-08B BP Exploration (Alaska), Inc. Permit No: 212-013 Surface Location: 603' FNL, 312' FEL, SEC. 24, T11N, R 14E, UM Bottomhole Location: 81' FNL, 1528' FEL, SEC. 23, T11N, R 14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincere41 like % IIK . m. Com issioner DATED this5/ day of January, 2012. cc: Department of Fish 8s Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) < STATE OF ALASKA ALAS,.. .OIL AND GAS CONSERVATION COMMISolON JAN 2 Q 2012 PERMIT TO DRILL18s8 �� t�lt:s ® 20 AAC 25.005 munaS10111 t r 1a.Type of work: lb.Proposed Well Class: ® Ant: Development Oil 0 Service-Winl 0 Single Zone 1 c. Sp l w� proposed for: ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska) Inc. Bond No. 6194193 - PBU 18-08B • 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12838' - TVD 8670'ss • Prudhoe Bay/Prudhoe Bay. 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028307 603'FNL, 312'FEL, Sec.24,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 799'FNL,4042'FEL, Sec.24,T11N, R14E, UM • February 15,2012 Total Depth: 9.Acres in Property: 14. Distance to Nearest Property: 81'FNL, 1528'FEL, Sec.23,T11N, R14E, UM 2560 39000' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 53.70' • feet 15.Distance to Nearest Well Open Surface: x- 691439 • y-5961258 • Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 1500' 16.Deviated Wells: Kickoff Depth: 9630' feet . 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 3203 • Surface: 2323 • 18. Casing Program: Specifications - Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD ND (including stage data) 4-1/8" 3-1/4"x2-7/8" 6.6#/6.5# L-80 , TC-Ii/STL 3338' • 9500' •8226'ss, 12838' 8670'ss 165 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD (ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 11460' 8739' None 11373' 8738' Unknown Depth Casing Length Size Cement Volume MD ND Conductor/Structural 110' 16" 1635#Poleset 110' 110' Surface 3908' 10-3/4" 2500 sx Cold Set III.400 sx Cold Set II 3908' 3791' Intermediate 9536' 7-5/8" 450 sx Class'G'.200 sx Arctic Set I 9536' 8309' Production Liner 2079' 4-1/2" 267 sx Class'G' 9380'- 11459' 8183'-8739' Perforation Depth MD(ft): 10042'- 11347' Perforation Depth ND(ft): 8719'-8736' 20.Attachments: 0 Property Plat ® BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoi.g is true and correct. Contact Mark Staudinger,564-5733 Printed Name ..hi (u1179,/ Title Engineering Team Leader Prepared Name/Number: Signature - Phone 564-4711 Dateii..-6// Joe By Joe 564-4091 Commission Use Only Permit To Drill /j C0(5 API Number: Permit Ap ioval Date.._ See cover letter for Number: 7_,/-2._ 50- 02a. 2I C77-�z-"e- 1I,)l 1i 2 other requirements Conditions of Approval: If box is checked,well may /7not be used [d usto explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales:— Other: -.1 �O O S 4- igo/' S't --. Samples Req'd: ❑Yes I'No Mud Log Req'd: 0/Yes I3/No H2S Measures: at Yes 0 No Directional Survey Req'd: Lid Yes 0 No Date A.F/'/ ' APPROVED BY THE COMMISSION ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months toji o =•..! ., o I 0 AAC 2- 105 • Submit In Duplicat'j 7 .v [ t. , , L,. 1.3a-/Z-/ / ,.0 To: Alaska Oil & Gas Conservation Commission 41 From: Mark Staudinger bp CTD Engineer Date: January 19th, 2012 Re: 18-08B PTD Request Approval is requested for a permit to drill a CTD sidetrack from well 18-08A. CTD Drill and Complete 18-08B Program: Rig Start Date is February 15th, 2012 Pre-CT Rig Work: The pre CTD work is planned to begin January 25th, 2011. 1. W Check tubing hanger LDS. 2. W PPPOT-T to 5000 psi 3. S Dummy off GLM 4. D MIT-IA to 3000 psi, MIT-OA to 2000 psi. 5. S Run Dummy Whipstock Drift down to -10,000' MD. 6. E Set 4-1/2" KB Packer Whipstock at-9,630' MD. 7. V PT tree (MV,SV,WV) 8. 0 Bleed production flow lines and GL lines down to zero and blind flange. 9. 0 Remove S-Riser, wellhouse, and level pad. 10. V Set TWC -24 hrs prior to rig arrival ec,-ARig Sidetrack Operations: (Scheduled to begin on February 15th, 2012 using Nordic Rig 2) 1. MIRU 2. NU 7-1/16" CT Drilling BOPE and test 3. Mill 3.80" single string window in the 4W liner at 9630'. 4. Drill 12 DLS lateral sidetrack with 4-1/8" bi-center bit in Zone 1A713 to a finaTTD of 12,838' md. 5. Run and cement 3-1/4" x 2-7/8" L-80 liner leaving TOL/TOC -130' inside window. 6. Perform cleanout/log run with mill, motor, and MCNL %�'2- JI"Z 7. Perforate well (-1000' planned) Nom`' 8. Freeze protect well to 2200' TVD. 9. Set BPV. ND 7-1/16" BOPE stack. Freeze protect tree and PT tree cap to 3500 psi. 10. RDMO Post-Rig Work: 1. Re-install S-riser, wellhouse and FL's 2. Pull BPV. 3. Run 4-1/2" liner top packer if needed, and test to 2,400 psi. 4. Install GLV. 5. RU PBGL. 6. RU test separator. Mud Program: • Well kill: 8.4 ppg seawater/ brine. • Milling/drilling: 8.6 ppg Geo-VIS for milling window and drilling (-732 psi overbalance). Disposal: • All Class !! drilling and completion fluids and all other Class II wastes will go to Grind & Inject at DS 4. • All Class I wastes will go to Pad 3 for disposal. Hole sizes: 4-1/8" 9,630' and— 12,838' and Liner Program: Solid, cemented, and perforated completion. • 3-1/4", L-80, 6.6 lb/ft TC-II liner 9,500' and — 10,250' and • 2-7/8", L-80, 6.5 lb/ft STL liner 10,250' and— 12,838' and • Planned 34 bbls of 15.8 class G cement will be used for liner cementing (assuming 4-1/8" hole size to TD and 20% excess in open hole). • TOC planned at 9,500' MD. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. / • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in the hole. ✓ Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 99°, inclination at kick off point is 18°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 39,000' and (South). • Distance to nearest well within pool — 1,500' from 18-07A. Anti-Collision • 18-08A 1' (ctr—ctr distance) Status: Parent Wellbore. • 18-08A PB1 1' (ctr—ctr distance) Status: Plugged and Abandoned. • 18-27C 54' (ctr—ctr distance) Status: Plugged and Abandoned. V Logging • MWD directional, Gamma Ray and Resistivity logs will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. Perforating • SWS 2", 6 spf, perf guns, 1-1/4" CSH work string and 2-3/8" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in the hole. �( Hazards • The maximum recorded H2S level on DS 18 was 70 ppm on well 18-18B (5/22/2010). Reservoir Pressure • The reservoir pressure on 18-08B is expected to be 3,203 psi at 8,800' TVDs (7.0 ppg equivalent) • Max expected surface pressure with gas (0.10 psi/ft) to surface is 2,323 psi. �_ • A EMW of 8.4 ppg for this well will provide —640 psi over-balance to the reservoir. Mark Staudinger CC: Well File Coiled Tubing Drilling Engineer Sondra Stewman/Terrie Hubble 564-5733 TREE= 4-1/16"CIW WELLHEAD= FMC 1 8-0 0A SAFETY NOTES:WELL ANGLE>70°@ 10060'. ACTUATOR= BAKER C KB.ELEV= 53.70' BF.ELEV= 22.06' KOP= 2875' Max Angle= 98 @ 10643' 2180' —4-1/2"CAMCO BAL-O SSSVN,ID=3.812" Datum MD= N/A 21 ' Datum TVD= 8800'SS J GAS LIFT MANDRELS 10-3/4"CSG,45.5#,L-80,J-55, ID=9.953" H 3 ST MD TVD DEV TYPE VLV LATCH FORT DATE Ir 1 3016 3010 14 CA-MBX DMY BK-2 0 11/25/05 Minimum ID = 3.812" @ 2180" I. 2 5732 5198 38 CA-MBX DMY BK-2 0 11/24/05 3 7805 6888 32 CA-MBX DMY BK 0 02/06/98 4-1/2" CAMCO BAL-O SSSVN 4 9248 8088 39 CA-MBX DMY BK-2 0 11/25/05 4-1/2"TBG, 12.6#,L-80,.0152 bpf, ID=3.958" —I 9314' g . ,---I 9314' —17-5/8"X 4-1/2"BKR S-3 PKR,ID=3.937" • 9347' H4-1/2"HES X NIP,ID=3.813" I 9366' —17-5/8"X 4-1/2"BKR ZXP PKR/TIEBK,ID=4.938" 4-1/2"TTP, 12.6#,L-80,.0152 bpf, ID=3.958" --I 9368' I J 9369' H4-1/2"WLEG, ID=3.958" 7-5/8"X 4-1/2"BKR HMC LNR HGR ID=4.813" 9380' , 4 -ELMD TTL(NOT LOGGED) TOP OF 4-1/2"LNR,ID=3.958" — 9387' 7-5/8" MILLOUT WINDOW 9536'-9548'(OFF WHIPSTOCK) PERFORATION SUMMARY REF LOG: BHCS ON 04/18/86 9599' —I4-1/2"HES X NIP,ID=3.813" ANGLE AT TOP PERF: 66 @ 10042' I:JP:P1 .1A.1.1.4Note:Refer to Production DB for historicalperf data 111111111 9935' I- -1 "HESXNIP,ID=3.813" SIZE SPF INTERVAL Opn/Sqz DATE1111111111111•2-7/8" 6 10042-10052 O 02!07/05 111111 10068' —129'MLAS JT,ID=3.898" 2-7/8" 6 10052-10072 O 02/05/05 .��..����2-3/4" 4 10147-10357 O 02/04/98111111112-3/4" 4 10407-10432 O 02/04/98 1111111111 10662' —129'MLAS JT, ID=3.898"2-3/4" 4 10447-10632 O 02/04/9811111111111 11111111111 2-3/4" 4 10717-11012 0 02/27/02 ►1111111111111111111• 11111111114 , ? —FISH-DEBRIS 2-3/4" 4 11072-11142 0 02/27/02 ►1/11111111111111111 2-3/4" 4 11172-11347 0 02/27/02 11111111111 MILLED CIBP ►1111111111111111111• 4 (07/17/07) 1/11/111111 11111111111 ►1111111111111111111• ,' PBTD — 11373' 11111111111111111111• 11111111111111111111• 1'1 7-5/8"CSG,29.7#,L-80,ID=6.875" 9536' .1.1.1.1.1.1.1.1.1.1.E 1���1�11' 4-1/2"LNR, 12.6#,L-80,.0152 bpf,ID=3.958" H 11459' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/21/86 ORIGINAL COMPLETION 02/07/05 JNA/PJC ADPERFS WELL: 18-08A 02/06/98 RIG SIDETRACK 11/20/05 BR/PJC CSG CORRECTION @ 3808' PERMIT No:'1980040 10/19/01 CH/KAK CORRECTIONS 12/02/05 KSB/TLH GLV C/O(11/25/05) API No: 50-029-21577-01 02/27/02: MH/KAK CIBP INSTALLED 07/17/07 RLM/PJC MILL CIBP&PUSH BTM SEC 24,T11 N,R14E,603'SNL&312'WEL 09/13/03 CMO/TLP DATUM MD/TVD/PERFS/ANGLE 02/05/05 JNA/PJC ADPERFS BP Exploration (Alaska) 4-1/16"CI WEL 1 6 1 WELLHEAD= FMCC - _V{ SAFETY NOTES:WELL ANGLE>70°@ 10060'. ACTUATOR= BAKER C 0roposed CTD Sidetrack KB. ELEV= 53.70' BF.ELEV= 22.06' KOP= 2875' i 1 Max Angle= 98 @ 10643' - 2180' —4-1/2"CAMCO BAL-O SSSVN,ID=3.812" Datum MD= N/A 0 Datum TVD= 8800'SS 616‘. 3::; — 10-3/4"CSG,45.5#, L-80,J-55, ID=9.953" GAS LIFT MANDRELS IIDST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3016 3010 14 CA-MBX DMY BK-2 0 11/25/05 2 5732 5198 38 CA-MBX DMY BK-2 0 11/24/05 3 7805 6888 32 CA-MBX DMY BK 0 02/06/98 4 9248 8088 39 CA-MBX DMY BK-2 0 11/25/05 >< IP" 9314' H7-5/8"X 4-1/2"BKR S-3 PKR, ID=3.937" 9314' -I 4-1/2"TBG, 12.64,L-80, .0152 bpf, ID=3.958" ' 9347' —4-1/2"HES X NIP,ID=3.813" Minimum ID = 3.812" @ 2180" 4-1/2" CAMCO BAL-O SSSVN 9366' —17-5/8"X 4-1/2"BKR ZXP PKR/TIEBK, ID=4.938" 9368' — 4-1/2"HP, 12.6#, L-80, .0152 bpf, ID=3.958" _' MN 9369' —4-1/2"WLEG, ID=3.958" ' 9380' —17-5/8"X 4-1/2"BKR HMC LNR HGR, ID=4.813" 9387' -JTOP OF 4-1/2"LNR, ID=3.958" 7-5/8"Millout Window 9536'-9548' 3.7" deployment sleeve/4.5" KB LTP (Off Whipstock) TOL/TOC —9,500' 101.0111 17-5/8"CSG,29.7#,L-80, ID=6.875" 1��A�.�A�.�A�.�A�.4 PERFORATION SUMMARY 9599' —4.5"X Nip, ID=3.813" REF LOG: BHCS ON 04/18/86 TD @ —12,838' I ANGLE ATTOPPERF: 66 @ 10042' 3-3/16"x 2-7/8"XO @ —10,250' 2-7/8"4.7#L-80 liner Note:Refer to Production DB for historical perf data All Perfs Closed with Packer Whipstock and Liner Cmt Job _ r� SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 6 10042- 10072 Pendine 2-3/4" 4 10147- 11347 Pending 444 10068' —129'MLA S JT, ID=3.898" 17 degrees TSGR 11,170' 4 10662' —29'MLAS JT, ID=3.898" 4.5"whipstock @ 9,630' .'',',��I ? —1 FISH-DEBRIS MILLED CIBP(07/17/07) 4,# PBTD —1 11373' 4-1/2"LNR, 12.64,L-80, .0152 bpf, ID=3.958" 11459' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 08/21/86 ORIGINAL COMPLETION 02/07/05 JNA/PJC ADPERFS WELL: '8-08B 02/06/98 RIG SIDETRACK 11/20/05 BR/PJC CSG CORRECTION @ 3808' PERMIT No: 1=NDING 10/19/01 CH/KAK CORRECTIONS 12/02/05 KSB/TLH GLV C/O(11/25/05) API No: 50-029-21577-01 02/27/02 MH/KAK CIBP INSTALLED 07/17/07 RLM/PJC MILL CIBP&PUSH BTM SEC 24,T11 N, R14E,603'SNL&312'WEL 09/13/03 CMO/TLP DATUM MD/TVD/PERFS/ANGLE 08/29/11 EV CTD PROPOSED SIDETRACK 02/05/05 JNA/PJC ADPERFS BP Exploration(Alaska) VS W o 1 m Niuex g as 123 LW o -On C^ w e Q m Z -N O Kv x Q 25. _ 1 41 n F o PG _ m g m \I F Y O , n 5 co $moiE W h N [�^ ^ m 88§8 E N . N Z F c y 9 -2 V F ^ h .49; h l' m _ ` _ _ .n _moo • o O 6N o0 x� _ ,� "„ 01 a8 co F Qy 8 O ow mt c 0 C. " $ "o o c o h kin w 3m 8 8 Q g = 7 4 4 c S o N �m/8 OSI)�+)�0fsMipn0S r F NN Oc v _ I. Fjj PS m18 ys F v ,sg 5Fool r g — mh „ I g $ ',2 i Q /0 .- �N e7 Q"n.D l�mm O Q o 6 q V r F _8 m m4 O� m _ m4 r�i,Nomm12,"q $ai-'= $�.mo.m O T o 3 i & .c� ps� a$ssssaasa$asaag .cu) in., oMR22s228nS� X82mm c4 c4 cv c4 Sab%2 Q D-,-s-••••• E mroeC � 3s$ss$sas$$$8888$88oNa .lo.c ,,c4 i [ VSo y 8. N3Fm ^g o; _4"dt37al�mN$2�e,2 0`lR:2RF.9f2. a m.,,.,,,.,,,,,..,..—„,,l $ � N m o a .722$2.82:-$m$2mm#iNPEo63$$, $ 1.6 gig a y 2 en � ! !! !!!!!:!! !!_!!!!_!!! Q < ¢ S AianFO—kIRIIEVA0A7 ;"=„ A .0 0 o�'2RRaSaESBS2S$82m* 3 �mm ' u jo ,R8a$8 �F "�{ „2$2$2$88 0 A. �?oo N'Nrf N N N m m m m m IT 000� BrSSilSX3�R� oa� Cr$ ^ 8 P N m m v m a 0 �O .A._Nt�l Q.nml�..o NPJQmoc.,.mNH (UM/06)yidaQ Moll-10A°nil V1 Iw 1111ZW' d 9 Pi CI Q00 7 9 c'c'b '7 F 0 4 -- oSz8 - -05Z8 g sg $ sa E7. z IgY,2450 Hifi85 a 1D1'.ii IE 0018 F co a N 8300 V- F m 0Sg G .. � • ❑ a O j K m e • cn 3 a co f"F' spm ` '� 8350_ - 8450 j en ros am m os£s • 2 Nm tw 2m9 sa< 8400 c. EN3it.a= =a a LM 3 c a. W on fP o O 0 [-, a -7 0 O O < Jj0 P. P. R. c7. R. r.. ',I ,c1 ,c1 gl g.1 'A ',1 gi gi A n 'A n g ,,, A lz; `A 'i,--, `i,i gen °N° (u!/8 £)(+)tphoN/(-)1I1nog 1 a Wiwi NW Wm 00LS: o CO4:1� a 00 Z ooss 0018 °° CTo-- 15001 0065 bB_ .400 .200 0�0 � 0058OO ;500 Io 0009 0098_ ,60� .300 k� m • OOL8 [o S a OOI9 szks V o • o0 00 a c:, + -,11;11 ooZ9 N q z 3 1612 i 0019 :696 0 500 11111 o 6t2 OOb9 61'0 v $ I 00E9 .701 0099 v .800+ OOL9 m a Qo iii m 2:101 !i09_ .900 J.7 a ,-m b a m 0 f 0069 g a 0 cc m o 00' O 3OOOL d + a 00[L . (I00 + ' �zl m f e PIM OOZL.. 200 g ai 4+41 300 i o ODS 009 06. / 00 o F.:. I'' 0' 0%%. 119L 500 ,' 0 - owl 004L ' m o ' 600 m o6. ,,C CO ¢ 008L :4111 IS Cr, oOLL•_ ,o tg: Y m 3 a g O o06L f s- a .1.,=i o0 008L_ 3 t7 0008_ 006L i 0018 a O 0008 Q N F. 9 og9e8 � O O O -v � W _ � N Oro 00` / O o0 `? 0_ 9 00 CO OO!8_ // O O A / 00 N 00 `yy, pp 1 00£8 \0Q`g\� // i ...... , -i 0 S S rQ b C NV 2 O 4 • Y Y b I N o o Q G ?g,.,.., 1(n m ,G N Q T N1 W v mil �' Yo W4, $ aPtI RIM F --981Am Xul rIMMENIEHEIE 55 la= §8gE$$$$$$$$$$$$$$$$H$ m 2 m [.. Io �� W�Sf,MgBo E"M8RmR88R m 5 S S 9 s Z q H$8HH88HHHH8$8SSSSSHS 55 a I' o N gb>y m S 9 $M$ 4NMR` $m$rW02rR ocq ii!! yaz 5“R oSIlo8zzzC,gP ; �¢$*emsasm0pA sn !! 2nds6a.5,66,6.5SoSSoo� 222. #4iigg4P4yg88§01 r` zA �^7oco w �1opo pyq - -§§abH 5 0 w adobaboSW�y �$ an,. !!!M n1F-si bddabd i m fcc WWE LL O N `v I` gw 25pG8F18,I 9972668S83S28$ o € ;_ wl €N - 'Qmmio8888Ci888gMg% $§$€3¢Q 8 '� a Hill Z g68qgHg gHg��NgNNNHp Trg%3E 8 U 3$ m o 0 0 a '--7---______ O o r c"„'2 E n. i/ -ig '6775 8 -_ \ \ ab c 8°4- 0 - 0. -fe. ----,---,---------.. . ... R$v a L. m m Oh I;s':...;.S -752-. `•'` \ \, co co L11 t o app coc,�... % -._-AN 09:5%501, \ oo ani "+ �pp�` ,' ,. -. 736 \`'' o y ^p h ` � 718 `` \\�\` o O ' 1111��//������ \ � `� 111111111 o a`o ,,. �, O � � \\\ i\ c N FO 8 co O O O O C�\\ O O O .fl ul N_.. tn �.. in m u O :9 O > 6 m m n. co u3 a\\\cq a g50 " N c'' v cn co ^ m m ro a \%%\t\\*13\\��� ,,�. sililit F_ r±) , ;--� �r lllllllll��ll oas / g lif 11 N 4, a _ \ \ -...„. 4mRkpAtt!!! -- _____. 1::::40.5:3 15 Sag \\-..''.•.'.- '---•...'"•-_,..,--.--•:,.... ._". _.'' .,---------.-' ---------..___----________,.____.%---------•••--.•--,..7-, ,# 0 :ft_..._ ....____ft.i- _ - ----------'--.---------"..----_-./'._...._.,„- ._.............;..-------..-.i N 0- CO I a 0 a a, a Ce I o _ a, = E F-- N ac ' 2 � .. N CO o c 0 II h uVt , a ra �N= ooo � m � ��; co a m CD mCY = W H Z a Z 1 3 ZI o cO = I m N to 0 . C o )) co O I co LO L0 V o O 0cl, in 0 ZO N CD N CO N 0 oM C/) 0 0 , N mI C 8O 0 o i 0 c d m a) ao °) a) o °� o c m = m d a) v CO > on o Z > c) cliZ a ) 0 J t[) U < J- '~a, d O a) 11 E CO a), > co Cn Q 7 7 0> 0 d J 1 a• cinioo cM mc) c c r c 0.7 o a) y y a) c F- W 2: D W yy, c O y > co J C9 a) d r O u o '° 0 o ' co lo ▪ c ._ co w d J J 0 .c r O 2 a c a7 c O r E a)) , c :as E to > > a 6 0 c ,- C) R y 0 O m a) m m 0 0 o w ad 0 y C Oo o wre E = = N 0>, R L d « 0 V o :+ � o � r 2 :° H v, 0 rn m� � J• H 2 Z C/) o co M 0 O 0 a✓ a= Q N cC7 cC7 N o CA M o O) CO cn M Os-EI o_ cuj N 0 a) (U N CO Q CO in EL C O. t ti M = o a) H 0 E so 0 o i ° E o U s o ~ + a 3 > co N CO o) v w `'? a) zr E• co co m c N CO r0 C,5▪ C .c C .c 0 2 W i/) r N d as 2 W v) o I a, 0 o + o z Q J Cl_ m m 0 w N 0 g aso os °' .0 D = a ca ... d N m co m a E o Dv o u) O`= co [l m m Z o LL m 0 I l 0 « >; r Z 0 0 0 0 m g m oN,O ~ o 0 0 0 o 0 C) W oE75 y E N Q O c Q O CO 0 m ca 2 Lo CO Z a) 0 O co Z C Ca ` 0_ c m 0 a) u d a)N N (1 O ao oD m d Amo m a) ca a) o E a) 'e M N 3 2 Cti r --000 c )Z Q - + + o 2mc60 m c_ c•ta_ a za a a 2v C �, W Ic o C ) ►��1OIZ EE O c o c iii i o « C = D • n rn N 6� � > Rc `� c .. d � 11 i o o oc g o a) R°S= Z a .. rn m MON a . a c ea 0 o m [+ p .O dd ,� 'O : « O .. « OmdO cw d co d m d CO Z 0aio55o a 202 m , LLa ?s 3 a 3 2 0 Q > > co 0 N 0 0 CO 0 0 U) 0 O 0 0 O N 0 0 N. O CO 0 O CD CO ON- CO O 0 O O N O O .a O O) U, CO ' M co '7 N CO O) O) O O N M N N N N CO CO CO CA O CO 0) V ... CO R 0 u. M O O N CO) (V V- N- M O) CD CO CO 0 )O CO O CO ' N- r co CL O) •a- (O N- CO O) CO CO O) O N CO O) 0 Cr) 00 0 a. O N W O (O (C) N O M W W O O sf O O (y N- r N CO N 0 N (O N CO O Na- to CD )O T u (D CO CO CO N N- CO CO CO O 0 .- a- N N CO 0 • j M M M M ccM CO M M NI V ' V .4 V ' 0 C N 0 CO CO N O o g 3a o > o m 0 (n a) c'' Z Z o 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 J (�n < O v O o O o O o O, 7 O 0 0 0 0 O 0 0 O N O O cp v N N N N N N N N N N N N N CO CO Q -E co co r r r r r r r r r r r d O Co co CU J o O O 0 o C o 0 F M w 600 C) CO 0 CO CO CO V � N N C) a- CO N '.. o ••• o a O O O (O o CO CO CO N- N ,- N C O O CO 'U- N O 4 CO N (n M O N N O 4 d t CO N (O 0 CO M (O N W O 0 N O .0 (O (O (O ([) V' M N O O CO O CO - d r N N N- N- r r r r r r r N o O O K 2 .N 5 ow co co o co co COCO 0 CO CO CO CO OD 00 0 C (6 (O O CD CO CO CD CO o CO CD CD CD CO CO CD O d O w CO .. U' *.. .- C 0 C C c V N CO O CO (n 00 O CO O (O N O 00 N N-- 0 C d w CO . (f) C 0 CO N CO (O CO U N CO N- CO N cD O w it a) O y 4 4 V N O (!) M 00 n 06 00 O n O o cp ..- Ce A (C o) tT 0 0 CO N v CO (n v 0 CO CO in W Q. . d - C m CO C) O) COC CO CO co r N N N CO CD (o Y Cn O o o O O O 6666 0 O O O O O ! 0 > ... t c N Cm) a r g CO O M CO O CD CO CD CO CO CD CO CD CD CO CO J F- 2 z 0) Cl . @ o C) rn O 0 0 O O O O O O O C) C) rn C) l c O C Z (n U, (n ((i ((i (n in ((i (n (o (n (n (n (n (n (n t 0 0 oo 0r.... 0 CO (n v (n CO CO vin (D CO N 0 ,:r N 0 O CDN p 0 O n O O( 0 COO M (O 0 O M M a 0 (n N- M M O N N co 4 N N V' o N O UrCD co co N O V r O N CO CO (n TN N ' CO C CO a0 co CO CO O O O r N CO M ([) Io CO CL M ".5- M M M M .- CO 7 w I- 0 U (1) co Co 00 N ' 0 ' (O M 0 0 (f) co co co O a• g (n co 00 a- O v 00 v a- (n 0 v M (n CO CO CO m d (� d' V M 0 O O O O O a0 O Na) O Tt Tr to to (!) (O O M (n (n O) (o F- N N N N N N N N M M M M 'T V co z v �-- a c >-0 � z I- O 2 co N CO ' ' CO (n N o V- 0 CO N a V (n CD CO N CO 0 CO (V O) CON. ' . . • m (n co a O a- O CO O Co CO (n CO N co co to o co N U) CO CO CO CO CO 00 (0 CO CO M M M � � to (n O CO CO CO CD CO CO O (O CO 0 0 CO CO 00 O o O CO 00 CO 0 CO OO CD 00 CO I- ...i. CO p 0 co O N (n (O C) co r N O CO CO CO CO CO O CD O (O at O r CO CO CO CO CO (O CO W r (() CO O N N CO CO co co CA CO CO CO CD CO CO (O CO ' M NY In CO CO it d• O co N N N N N N N N N N N N N N N N m N (7 Q O < CO N >` CO fU CO (D p (l ) C J3 >`@ o co N (n N M to N 0 ' N N CO CO Q 0 d N CO U) (n (n M) r u) (n N- O o N M CO N d 0 0 CO N- CO (n r CO CO CO O Co co O O co N M ' V (n r CO O O O O O O O T0 (O W J • co N OD C) CD CDCO CO 0 PV' (A CO 00 Co 0 Q O co I- , b t 'O O 00 co C O i oo o0 00 f6 co' d ix Z 0 a O ol O O O >� 0 0 0 0 0 0 0 0 0 0 0 C` O O N 0 O ix ' N 2 p 0 > O O O O 0 O 0 O O O 0 N 0 0 t` O O `Ft O N_ Z N CO (O O 0 0 (On 0 0 0 0 CO 0 0 CO 0 0 O yt Rio O E co 3 co CO Q CO v N co co O O a- N N M at v_ (O CO 0§110 > ai F o F °) Cl) 0 - o) d o)• O o) c ooO ao 0 0 0 o O o o O 2FY w a �� �� N' `7 a > LL 0= H a � ) a o 'o« m m m Z °a co Z 0 o- CO 0 Cn a _ CO N O h r O O CO O O O N O O O N O O N. M O CO COO O O O O O O CO 4 O O O N O O a O N N O O O O O O O O O O C) O O O O) 6) O) 6) O) 6) O 1- r N- CO CO O) O O) C) m CD Cao CO H C`) O O N CO CO N- O M N CO O CO 0 CO r N CO O CO 0 N r CO C. CO CO CO CO O CO CO CO O N O O ON O N- O M a Nr N r r Cb O r 4 CO M M CO M O V 6) O .4 O r N CO M N CO N CO N CO N N CO N N CO CO O V M V CO CO CO N.- h CO (A O O N N M M CO0 75 N v v v v v v v v v v v 0 0 ori 1.6 i6tr.; ..6 .4 .n 0 c a) o > 0o ca a o o = o a B. 5ca U V) a) co Z Z O O O O O O O O O O O o 0 0 O o O o 0 0 O c Q o c) 0 0 O O O O O o 0 0 c) o O O O O o 0 OD co ,,\ 0 NN N N N N N N N N N N N N NCV N N N N �.., CO coQ7 ,- O)G a) co0 2c2 JO NN.- N N 4N r CO O N- CO CO O CD O CO CO CO O I', C) N CA N O 4 7— CO 1- O M CO r V CO ,—• CO O O) ,- CO C 0 ' N CO CO V CO O O O r') CO • CO n O ` L co N N CO NCO N CO CO CO N Nr a CO CO r N CO CA C N- r CO O CO Nr 4 M CO N N '- O O O O CO CO r CO w N c CD CO CO CD CCOD CO CO CO CO CO O O O O O6 e 2 H g CO CO C coco coo co ao co co co co co co co co ao co ao co co co co C R co co co co co co co co co co co co m m m CO m m m m m 0 W I; ci = V N C 7 c c .- C) N h N CO O 4 N CO CO CO r M O O O O M N C a) ,4? 1a CD CO M CA hN CO M 4 CO V r CO O CD CO a- N I- O w a) a) O N CO CO • W N O t` O or; r O •7 O 1� N W (J a) 4- R' >, Ca p) V N O O O O N CO CO CO O 4 CO O O v CO CO N is re .c m a c Co Co co O co co co co CD co co N- I,- N- CO CO co CO CO a) S t CoOm0000mmmmoOmm 000 J > Cl as p- 0) Co CD 0 0 0 co co 0) 0) co co 0) rn 01 0) 0 CD CD O 01 C0 0 0 co 01 0 co co CD o) FZ CA Lci Lci ci Lci O O O O O O ori ri ..6 Iri ci U) O cri U) kriZ t 0 O" r O f CO O M r O V I,- O N O N N CO M O N M M N O O r N- V O CO CO r• CO N CO O N O M O N N- 4 CO 4 CO • CO M r O O M O O CO CO N- M N- O) N aD N CO O M CO CO CO CO O MC co N- a0 CO O O O N N CO V Nr O CO CO r W 7 g^. sf V sf Nf O C[) OCC). O II) In I[) In C[) CC) Cn O Cn I— o U r N CO O O 4 CO O 0) 4 h CO 4 N N- CO IN a O CO CD 4 CO CON 't O CO CO V N 4 CO N d. CO N O M V O N O CO r O M N O (O M O N- N a) O MM CO N O CO CD CO CO N- CO 4 M Cb p) O O O In Cn O a sra M M ) M N N N7 Ca z. a O N N sf O I m CD v o O v vCO n CD CO CO CO r CO CO O O CO CO CO CO O M _ V N 4 O N CO r r CO CO CO CO CO 4 4 CO N N6 O O O Co co I N- IN N n I r r` N- N. m O O O O O O O (I) co co CO co co co CD CD Co co co co Co co co CO co CD co co CO co co 06 co 0o m 0 o co co CD co co o co co co co c c N O O N CD O 4 a CO O CO CO CO O CO Nr 4 CD CD CO CO CD CO CD N I-- r N O 4 M M CO O CD N N O M O O IN N O 11 N O O O O O LOU) C) r M O CV O CO r IN CO CO O O CO N- CO O O O O O CO O O N N N N N N N N N N N N CO M CO M N N N M CL Q Qm Cl) J CO O r CO CO N N N N CO CO 4 N- O O O O O Q N CO t` 4 N O O O O O O N CO LO O O O O O O O O O O O O M N- O N O O O O O O O O O O O O O O O Cr) Cr) O O O O O Cr) O 0 T 1 W CO W C u Q Om O , 7 co 0 a O O c Z d a ,- d r O o N 0 I- O N- O O r O o IN o I-- 0 O o O a vT N o o N O N o N0 O IN O O N- o 0 O CO o O v1111W d NM O O CV O O V O N O O N O O O O N O O O O N O O O O O O O Mco O O O O O Oj p Meg= c CO r Cb O O O OO N N CO. MI O O CO CO r CO :Wb 1doO cR .. y 0 oo 0 0 o o l- r2 ^ ocv p c a) m= w(— E -•6 = - Zo c omm C' R co co O 0 0 O O 0 CO OO V O O CO O O N O O O O O O 00 O r O O CO O W O f� M a O O O O O r (O O6 O O m CO 4i O 0) 6) O) O m O) 9' O 6) CA aO 6) co co O O O) C9 CO m 0 U co (6 0 I- O N '� !:- NdO W CD 0) N O O m CD e 0 O) 0) r M O) N- F- M M N CO O W 0 M W ) 00 O O r O O O aO O C) C) N M (O O ad1 Nr r CO r « O V- N M CO O O I- Z U O O O r r CO CO CO O O a- N- N N N M V O (n ui uCO O n cr cc o (0 (o (o o o m Co (o 0h> co a) o▪ Tv> o m 0 u) a) ML Z o O O o 0 O O 0 0 0 0 0 O O 0 O O J CO 7 < 00 00 O 00 00 O O O O O 0 0 0 °C5"31 �\ U N N N N N N N N N N N N N N N N N _ O O N N co j C J N NrCO CO 0 I- CO CO N O CO O CO N N O U .� a- 6) CO a- 1- M CO CO Nr CO N O (n CO O (O N C O m M M (b CO 17. CD to r CO CO (O In N O N E -c ,- 6, 0r- r O O N U) M CO O Cr) N CO CO C3 CO CO CO a V V co co N N a- s- O O O O C) w d = CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO V ', 0 2 .N E co co co co co co co ao co oo co op a) co co co co N --- CO C CO CO CO CO CO O 00 (O CO CO CD O O CD O d o W is -i w U a U U ` 7 C C C) C6 Lo r CO O CO a co r r r O CO co C` Q CO- ` w (p CO O N N CO O N- O) 0 Cn CO M N CO (C) 0 O o w 0) a) V N N M CO M (C) r Q) O CO N I� V W M I- 0 d '. re T co Co O CO CO M CO O) W CO O CO O M COTo W Q) O L d s c O O O I- a- I- a- N CO CO CO N' V V C() CO (0 Y o > Q o = to CO (o (o Co (o co co co 0 0 0 o co co 0 0 0 - F Z co 0 o rn o) pp rn pp Q) O on or, rn rn rn rn co rn Z (n tri U U U U u) (n 6 tri tn. (ri 6 ri LO LC (n O a) co N Nr O 0 CO (n N M O m N f` a0 N CO M M CO It- r r a0 M O O 0 O V 0) Nr N CC COQ) Cb N (O r O N W a0 O r r (A r CO O) N R) CO CO CO CO I� CO N- r O O m C CO ao aD m (A O O N CO CO CO Nr Nr V Mz E Cn (C) «) (n C() CO CO CO CO CO CO CO CO (O CO CO CO LY I- 0 0 _ N I- N CO CO r r r CO Cp CO Nr 0 r CO d 0 N M CO r M O 0 O CO CO CO CO N V N LC) CO (OCO O I- O M O O6 O W CO O CO O CO a) r Ch N N W CT CO O CO 0 Nr CO N O N CT N N N M M M V CO CC) CB Z �- Cb CO CO CO CO CO CO 03 0) O M CO O r M nt CD I- M CO CO O W r N O O O O O H M (O (O W 0) CO 4 W O CO CO CO CO U) CO CO CO CO (O CO (O CO CO CO CO r-- (I) W (O CO CO CO (O CO CO CO CO CO CO CO CO CO CO CO CO 0 W 06 6N Co W CD 6 co. Cd Cb op- CO W CO N CO > I- V co — — co CO Cr) N CO Nr CO W CO M Nr CO r SII N CO a- (O CO O CO r CO a- O 00 CO M f- M (b co (r) r r (O O W C- M O N6 I N Cis' O O O O N M N O M M M M M M M M N N CO CO M M M M M �a C° *-el e.. I1 __J 0 O O 0 0 O u) CO Cr (O 6) M CO00 0) 0) U) . Q O O O O O O CO l) CO CO CO N N CO (O r CO C O O O O O CO CO CO Cb CO CO CO W h r r r «x. (0 CO CO CA CD COOD CD OD 00 CO0 CO CO CO CO CO O U T pp a, m N n C N Q O m '7'C 'O 0 O O C O ` 02030303 CO 03 Z { Z d aa O CO O O CO O (O O U) O O CO O CO O O O co V d O co O O CO O CO O co O O co O O O O O N V Z O M O O M O M O CO O O M O r O O ed e- CA O CO O O O O O O 1� O O CO O CO O O M LlieI= 7 6) O O — a- N N CO M V CO CO CO CO N- N O ( CO Ewe s 0 ,a N N N N N n N N N N N N N C N N N 0 Ma 0 M N- iz a- a- a- — a-- N a- a- F 0 CV �=C O. d .. Q 0) c O m E'• C O r N d .O mco Z U o. co 0 a co N, a m d O coo co00) CU) 0 co O O u) N O O) 3 u) N N O r co co co Cn m 0 0 m -O) cu N N O) O N C• N N N N CO COCO J s V0' a .�- CO sr Q CO CO a a N rn Z Z Z Z Z Z 0 COO O N- 0 v 0 c a) -p N n o) N CO Cr) 0 m Q) O '00 W O N u) O O = a d O u) u) 4 u) u) 10 o > o z zz co ,- .r-- F- F- J u) Q -.1 o m U o 0 0 E. 0 0 CO (n Q E . c o w o o 2' 0 o 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 r° I- w CO CO ui m ui u) ui of • o m N N- o of ui CO m 0 u) u) n u) r CO aD co N W O 0 N O O 6) CO O O O O N O O O N O c- O u) 0 CT 0CO CO u) u) u) 0 0 0 0 u) 0 u) c0 c0 0 r u) 0 d CN W W 0 W W 0 O O O O W W CD CD W Co O O M N CY1 t) e CO CO CO 0 CO 0 CO CO CO tD 0 0 0 0 0 0 0 CO CO CO CO C co ` t W w d a) C G c' dj O O o O o 0 O o 0 0 0 0 0 o O 0 0 o O O 0 Cd C) is O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 O C) a) C O .' v .- V r r r ao r ri 0 co r oo r r co CO O .- C C ` V 0 0 N W CO N 0 CO N N CO N W M co N G ` d d n 4 v O - O u) u) u) u) 0 7 0 u) O O O 0 co C ) - N V 0) ' C O O O O O O O O U y to = m co co co m m m m m m co co Co co Co Co co m m Co 0 t• IX CD d d .0 O) 0) CO 0) 0) 0) 0) Q) 0 0 0 O O O O O) O 0) 0) 0) 0) 1 .R. Z ui u) ui ui u) u) ui ui ui ui CO u COi CO ui u) ui ui ui ui u) p O Q O c F J 2 Z W O CL N Ct co co M u) (0 u) N N Co n 0 0 n M sr W MN O) O c0 CO c- Co c- N N r NC O ' M N N n O NC O O) N CD O d) O) O O O O O n u) N O O) N a) r u) 4 4 C 4r n CO Co r n O M N 0 O 0 O u) u) Na) i eN M M co CO N Nt c0 u) N sr N sr N O r- m03 7 W tc) u) u) Cc) u) u) -1-- ..,:i u) 9 Co Co CO Co CC) CC) 1 CC) = W in U) W W o co rn rn 0 0 („) O N N u) N n n O u) O r N 0 sr CD n r Co N u)N O WN O) N M CO 0 CO N Cn N CO CO o0 u) CO 0 0 c- N O O r O N si co N 0 a N Ni N CO Cv0) M r U) r c0 Cv0) 0 u) ,- M 4 4 O 0 n CO N COO u)P co m 'i u) O co O u) u) O O) 0) co co op O) O u) N O) co co co Co to CO Co M u) t M co U) g' I O O) + zZ co Z '? Z Cl. ccoo u) 4v v QZ Co V V O u) m MN N Co O " op o. . . . . 0> . . . . . . . . . . . op op op r-> op o 0 0 o OF o o 6 0 0 0 0 0 0 0 0 ri> o> o) • ^,, n n co co 000-N FF-- c0 N CO M co O O O O CO O 0 0 0 CO M N Cb 2E 2E 2E • O cp O Q 6 O OO OO O. N 0) a n O N- CL O O N O co C0 CD ca .- C0 f0 (a `LQ u) Lo v = = 0) 00 oO OC") OM O0D Q d O e' ow 0O 6j O r O M 0 Nt O 0 O O O N O N O CO Q CT T T T T T Q:... 0 0 0 0 0 0 U T O. N N N N N N m o • a, .0 o-0m ,n o morO o o c rn rn rn o 2m � � a)a a Sa s ca m a z a a ca ur O w w CO v 111 N N .N-. N N co V cO co N. N M u) (O n W O a)) ti W d y cn N C C C C C CC!n C C C C C C C C c C C C N u) N p Mom E o y E 5 E 5 5 o f 0 5 0 0 0 0 0 5 5 7 E w CO E N E ih W M, >+ 4i CO '£ a c c LL c >,d a d a a c >,d d d d d 0 0 0 0 0 F C c F c c c c N MN c ; Z co � o mo mo 0o � o mo l0 V O c .0 ' E .c m as m as m as mad mad m Eo .- �= d a d .. ,p a) N 0 L Vf 00 o co 0o 0o °o C W - rn rn 9 9 0 9 9 9 m (- .o« m m ayi `m R w co w co co co co --. . . . . . . . . � , e 4 * 4 4 ._ Ti-o N- § \ q � CO . . 7 -co \ § co C ® \ st k - / - _ / z z z z 0 ow - \ . - - - Co Lo in o § k © of » a b )co / E � § }2\ 0 \ \ \\ § / & i j ILi: k $ $ 15 csi # Jc ii 20 ° e \ & N } E • ; | - >/(. ) _ k)o 7ceJ = o2 w w It £ ] \ LO eR7 ] e2znoco a V wE — /�0. 0 iv o LL / / to_ In / / % , , = & 2 & inE o ° co \ �co )7 §� j■ \/ r. 03 co§ f CO* & > - . > z CO sr Z srco § m R m a 2 \\ \\ \\ C 2 \ co co co c\I \ 0 0 / §$ §/ §§ §§ @ CO Lc) co \ sr \ §\ §\ §\ §\ } / \ < > p 'Cr) < 0 _ � § ) k k � �FTs \ .c -c too k § E § $ ECO CO co k \ 111 I § § CO ) a \ M■■ et_ mt_ ft_ @E_ ] % Ig® C ° F (5 I (5 T-- -.E' '- 'E. a. 2 4 D © t 2 = _�a_ =5� =am =s� �. Z \/kkk \ \ „ § „ § „ § „ f \ co I` -o 0 CO (0 Ci O (0 N (7 0) a Q N m j 0 N• -O CO m N O O = a d 6 > P. W 0 ' Ju) z < 4) o m dU U ' N Eco 0.,- -=—`- cN O a) 2E 2 2 ci () -a c o r w m (u g Ce c d) O is •• a) 0 :0• V U d C o a) o w 0 0 0 H O m w mre ix r m a o• > 0 0 :° 3 m J H L 2 N 0 -C I 0 Q a) CC 0) O. = � CO = ° I— o O O °' 6 mM 0) 0C) CO N 0 CO m E N > 0) (13 O a0 C O N CO V' O CO N 00 Cr) 0 0 0. 0 H Y W v co co N ao co N H Q Q O V' O V' O r N r CO M 4) N O U) CO N CO M CA O O M O M CO N M CO (- Cn CO CO O N C) C) e- N ON C) N r O 6) C) N V' O CD (- C) C) O O C) h C) (O co co h r CON CD r r CO N CO CO O CD d• N N CA (L) CD CD C) M O CD 00 C) 0 N V. NY CO CO CA 0 C) C) NI- a) W (M c7 M c? 'T a v a O O O U 9 (9 (9 (0 (9 (0 (0 (0 N + c_ 0 0 O O O co C) co O co co r 6) V' CO W CA N CO r CD N I- CO 0 cii O (O CO V' O O 1- CD O CO C) N M N r O O CO CO N C) 44 4 4 O N N4 N O O C) N 0 0) CO O O 6) O O (n a V' V' O 6) O O C) N CO C) V V' N- N O) 0 0 CO N J _ g N N N N C) 1" V' u? CO 1" 'T C) C) N N C) CO O 2 + a co CO r I- V- a- 0 0 at r CO 0 V' r CO CO CO CD 6) V' O (n N V- v (O N I- O CO CO N V• Ps. N V wCO O V' CA co co r (o co CON 0 0 0 O 6) C) 0 a^ C) CO O N CO CO 03 N- r r r O O O O O O O U) CO I� Q C y co Ch Ch co co co CO co CO CO CO CO CO co CO CO CO Co Co Co CD • 0 Co ao (n or; ao co 00 6 ao Co Co 05 Co C6 cc Co CO 0o Co ao Co CO O >. C co N co E N TS O 0 O 0 r r I,- r N r r I,- O CO O CO CD CD CO CD O Q O CO 0 r r CO of r O O O O N N N N N N N N O C) M O M Cv M t) C) Hi 0 c) c N p_- N co O O CO CO co 4 4 co 4 0 co 0 0 0 (- co co M _ CO CO co co N V- CD co 6) O N •V O O W .- N C) O co W Z a a °.� :-, a C CO 0 6) 6) 6) 6) O O O O O ,— ,— .— .— .— N N N N N N v ' N O 2 :.. v Y1 co of O 'p C) MWe lign c .. 0) c N N `m= W o ° ai d m coN 'c° co 7 0a ink 0 a 0 ,p.■ BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-08 18-08B Plan 5 Travelling Cylinder Report 16 January, 2012 Hill BP BAKER HUGHES Travelling Cylinder Report INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Site Error: 0.00ft North Reference: True Reference Well: 18-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 18-08B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Reference Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,625.00 to 12,838.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,480.03ft Error Surface: Elliptical Conic Survey Tool Program Date 1/16/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,625.00 Gyrodata Gyro(18-08A) GYD-CT-CMS Gyrodata cont.casing m/s 9,625.00 12,838.00 Plan 5(18-08B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 12,838.00 8,670.21 2 7/8" 2.875 4.125 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/16/2012 3:01:44PM Page 2 of 34 COMPASS 2003.16 Build 73 • Mill BP BAKER HUGHES Travelling Cylinder Report INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-08-Slot 08 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 18 MD Reference: 18-08A @ 53.70ft(gen rig) Site Error: 0.00ft North Reference: True Reference Well: 18-08 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 18-086 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 5 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 18 18-06-18-06A-18-06A 10,450.00 11,934.00 919.03 333.37 596.94 Pass-Major Risk 18-07-18-07-18-07 12,450.00 11,700.00 915.45 300.58 646.95 Pass-Major Risk 18-07-18-07A-18-07A 12,450.00 11,700.00 916.79 300.83 646.55 Pass-Major Risk 18-07-18-07APB1 -18-07APB1 12,450.00 11,700.00 916.79 300.83 646.55 Pass-Major Risk 18-07-18-07APB2-18-07APB2 12,450.00 11,700.00 916.79 300.83 646.55 Pass-Major Risk 18-08-18-08-18-08 9,933.18 9,925.00 28.21 6.66 27.73 Pass-Major Risk 18-08-18-08A-18-08A 9,649.93 9,650.00 1.26 2.64 -1.38 FAIL-Major Risk 18-08-18-08APB1 -18-08APB1 9,649.93 9,650.00 1.26 4.89 -3.24 FAIL-Major Risk 18-09-18-09-18-09 12,838.00 10,850.00 658.41 313.60 488.97 Pass-Major Risk 18-09-18-09A-18-09A 12,838.00 10,725.00 973.77 309.89 738.86 Pass-Major Risk 18-09-18-09B-18-09B 12,838.00 10,725.00 973.77 309.89 738.86 Pass-Major Risk 18-10-18-10-18-10 Out of range 18-10-18-10A-18-10A Out of range 18-10-18-10APB1 -18-10APB1 Out of range 18-10-18-10APB2-18-10APB2 Out of range 18-10-18-10B-18-10B Out of range 18-10-18-10C-18-10C Out of range 18-10-18-10CPB1 -18-10CPB1 Out of range 18-10_DO NOT USE-18-10-18-10 Out of range 18-10_DO NOT USE-18-10A-18-10A Out of range 18-10_DO NOT USE-18-10APB1 -18-10APB1 Out of range 18-10_DO NOT USE-18-10APB2-18-10APB2 Out of range 18-10_DO NOT USE-18-106-18-10B Out of range 18-10_DO NOT USE-Plan 2,18-10C-Plan 2 Out of range 18-27-18-27-18-27 9,700.00 10,300.00 1,354.22 296.86 1,059.70 Pass-Major Risk 18-27-18-27A-18-27A 12,838.00 12,550.00 1,479.13 419.76 1,059.49 Pass-Major Risk 18-27-18-27B-18-27B 12,838.00 12,550.00 1,479.13 420.04 1,059.21 Pass-Major Risk 18-27-18-27C-18-27C 12,523.44 14,208.00 54.27 370.97 -293.86 FAIL-Major Risk 18-27-18-27D-18-27D 12,075.00 12,200.00 1,432.90 356.58 1,076.39 Pass-Major Risk 18-27-18-27DPB1 -18-27DPB1 10,088.24 13,445.00 558.32 298.48 261.66 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/16/2012 3:01:44PM Page 3 of 34 COMPASS 2003.16 Build 73 2 2hl J d sly: Y 1 - U :111.6, 1 U v fU'O of U ". pp>m W 2 _ - €0 � ` I Y eta itiC LU m ar O s_ a io =� 1. o U —How ,fR H `w Y A v S m � 0,---F, 2 32 0 I o 0 im V 1111 � L> m I I II • j i al e OIlI U I `! + LL �; III11M11 m� Mil Q = O C .LI I •r I�p I F X111111 0 f f m m t 11• ro 11 J lix—_a" o v c0 uUa 5 4O Z • t z z g Q m LL C c> S . _ c 2 zi W ~ Z a 3 O o�o S a-. w Y 2 j i n m 0 U °a U 111111 u ,o N a Si) _ n W o Ids a ''E' > I ! U O Y _, mi V A E ,o19: r y N O = w f rg :,-: V. - f t Z 0 ■LI 0 J • . Ii 8.•. 9 " h II11 illl c II 11 I d � 1 I w ! G- •• ..• W t " 1111 ^ q _ N 0 -.-2 C i. `m ■ fa .1101111110F U U -r -, . / lie 0 cc W a c E* Z c vhtí1I OD NIJ U LL w 1 NM _ U ill 111 I I II II Q Z m EE U 11• II 11,11111 S a. S 7.I OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME (/5(4. / '-( PTD# �- C L Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: ( >''G^-c- hc E= POOL: r G�cl tC <I Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL Thepermit is for a new wellbore segment of existing g well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 RI C/) .a G) r- -0 COa 3 0 G 0 0 r o 3 o fl1 3 O co N' N 3.(D 1 , o w 0 M 0 co 01 0 o D CO o D 0 () in 75. 0 CD j CD 0 m ' 0 -I •• N N N n W co co co co co W W W 0) N N N N N N N N N N — — CD OD J O) cT A W N o n CO Oo ) A -, 0 CO CO J C) 01 A c 0 CO ) 01 A 0 13 m J O (n W N0.) N -, W DW N) -, J 0 0) 0) 0 0 K v * 0 CO CO 0 ', D = D 0 0 0 O u) (-) -0 D * 0 -0 -o O O .4, en * * * c r m z ,? C7 O o CD CD D CD 0 'o O 7' 0 0 = n 0- co n 0) K K K C 0 • = cD 'C) (D YD 'O 13 n C 0 (D 07 ,,,1- cD 0 X CD F.! v Q v D- 0 it m m �' 3 -i c < C o _ 3 < chi = _ _ 3 0 co r 774 CD ci 0 0 ? = 3 -o v (° CD w Leo Q = o o co o a u, - m 0 0 0 0 m c 0) 00) 0 F c cD < m . 1 07) CO v o N o a CD m o n n a)) o 0 F. m 3. c a 7- o 9- o) CD CD CD CD 3 m t X 3 co 0 O' 0 co N a, 0- O7 < 0 0 0 'CD 0- Cl Q 'Q 0- CD 0 Cl n n Q 0) �. 1- rn cam/) CD N j ° a N N 0 o, y : N c�D C C (D = n *. (D '(D 'o d N � CD 'O '0 7 D) , 0) 0) O (D M < ai cn b o oN 0 cn %n o- 0 0 O cn D- N * 0 7 (D (D o (U (O coD) O) coN -o (D CD 3 �N c 'o N (D CD 'o 'o w 0 -0 7' 0 D Oo 0 y 0 = c o co 3 v Q- m -, m n ( m a -o c) a g -o c c Q m or a -o m -I r., co cc.n -o o_ c co 0 3 a) CD 3 0- y uu 0 3 v o' a a v ccDD 0 < 0_ 0_ c o o R Oco 0. "O 'o N o O A C :1 - < n (D 017 n "D co N b m o o a v m fD m F ni v �' m 0 Z o o ' ° o a co m m w m m 7 j. c v a c v CD Q c- m y Q > j n °) a D v 7 o m �_ c o = m 7 0 0 0 o a o b 3 CD r N O O o Q 0 co 0 D 7 v 0 0 0 0) (D O� 0Q. 0 CD ;- CD Q. Cl CU o .C. .C. `< n -O+. o N 0 C •c Na m ° o 3 m o v ° n o7 'p o nc n o o T'0 7- N -o m co 3 0 7 .Z1 CD Po o 7 > > o m 3 7 '� n = 3 3 D O (p O O cn .y. -0 O- < 0 ti, < CO & CD CD an (D 7 CD 7 7" CO 0 O W (D O C 'o m' N n 3. N O n 7 O n o Z m N 0 c c > Q c)C 61 0 a C CD 3 Q0 0 c°. too n 0 m 15 a 0 '< CD CD CD cn n co CO CD m o — 5. .07. m o v o m °. v <' c -�., cD o N < 7 0) .�. C O n O N - ZD C 0 3 m < a CO 3 ai c m 0) o in Z. �_ M 7 n CA, 0 no) 0 co (0 CDD 7 a v0) N Pa O 00_ 0- --o N 0 D 0 N N C n 3 1] N. O C 7 '< a C v 2 (D C so "o a, TI 7 C �/ X con O O 0 -0 0 N CD v N O o N 3 o co �' CD ». D 0 7 n c 5' 7 p 0 m CD v w m O rn 0 m o O * 3 7 0 0 C 0 �* o O S 7 i cn -0 cn C.-.6 0 CO z z z -< z z -< -< -< -< -< z -< -< -< -< -< z z z z z z z -< -< -< -< -< -< -< -< -< -< -< z z D D D o 0 D o 0 0 0 0 o D o CD o 0 o D D D D D D D o 0 0 0 0 0 0 0 0 0 0 o D D i 0 cn cn N V) N N (n N cn N (n (n Vi cn (n CO N N N N 4) N N N 0 0O 1 Hm a _o •..._ ,D -o m ox E K * m _X r m (n (n C) o st 0 •U x m 0 CO 0 0) x CD 0 N m CD n 4, 03 c 0' '- O C c O m 3 .0. 00 0 TS 0 0 3 O, -0 N c n 0.3 c CD0CO 0 0 7. — S. c CD 7 II N . CO c. (D cD 0 n) x - Z 0)0 n o 0 w CO3n < cn ' c nai CD ° m CD 0 1 m 3 0 K (D () j N —• 7 0 (D (D 0 cn co cn (') < m 0 W ma' co w 0 •o 0 = n CD N 3 > 0 0 y c W D (D CO 7 N ,G � cC < 0) CO O n cp D �p o m o n v. o m 0 m -< a v 00 o Q. x C' m m cn -0 7- 0 CO c CD o (n o- N n m (D -o 'o (n 3 _< CO N CO CSD 70r CD 3 (D 0 7 -. O 3 .Z1 0 O 0 N N O' 0) W O 0, 0 cD j . CD 0 9' 'O 0 C O 0 7 CI) co v m N o a 9 3 to o m o m x CD n m > v co a m 7 ca cD o s in co 7 CO D a 3 0 = 0 'm o N. c' o CO m o 0 o D c -, n C3 3 n) m n CO m _ a CO o O D CD E �) m -0 o ° -0 o D o m r o -< 7 — CD 7 O J N 7r CD CO 7 C N ? o rn a G.) m CO 0 .- m > m 0 o) 7 Z v) 73 c N cn •o n cD n 0 A > -I M vCO fD, °) oo c 0 ° 0 3 vo) cn r w _ O 0 m CD .7 - O (n * m 0 N. 0 cn co 0» co coO < 0 A X 0 N = < W C co o (D C. < 13 '+ 7 01 CD O O- CD W - CL 0 - n c in' 0 0 *__ c w * Sw w w 0 o o N 7' (D D Q "6 * StN j CD Oo (D CD (D CD 0_ O) 0 c.o ' j' 0 a N p N O (0 C (D n O 7 X N C m) c co O3 CO < 0 0o v- m 3 7- < c o 0o n m O D 7 co 7 — c — m Q 0 O (o 'NW o 0 m o 0)