Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-016
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Saturday, January 25, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC ORIN V-229 PRUDHOE BAY UN ORIN V-229 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/25/2025 ORIN V-229 50-029-23464-00-00 212-016-0 G SPT 4407 2120160 1500 1563 1572 1562 1560 585 597 597 596 4YRTST P Bob Noble 12/2/2024 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN ORIN V-229 Inspection Date: Tubing OA Packer Depth 0 2504 2404 2380IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN241202173347 BBL Pumped:3 BBL Returned:2 Saturday, January 25, 2025 Page 1 of 1 9 9 9 9 9 9 99 999 999 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.01.25 23:14:56 -09'00' MEMORANDUM TO: Jim Regg I`� 24 ',u�1 P.I. Supervisor I\ I Zz' FROM: Matt Herrera Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, January 7, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC V-229 PRUDHOE BAY UNIT V-229 Ste: Inspector Reviewed By: P.I. Sup" V Comm Well Name PRUDHOE BAY UNIT V-229 API Well Number 50-029-23464-00-00 Inspector Name: Matt Herrero Permit Number: 212-016-0 Inspection Date: 12n/2020 - Insp Num: mitMFH2O1208155605 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well V-229 Type Inj O- TVD 4407 - Tubing 1488 - 1485 - 1475 1474 - PTD 2120,60 'ITypeTestj SPT Test psi 1500 - IA zss 2095 - 2044- 2032' BBL Pumped: 11.2 BBL Returned: 1.2 OA 496 504 - 504 - 504 - Interval 4YRTST P/F P Notes: MR -IA performed to 2100 PSI Per Opemtor Thursday, January 7, 2021 Page I o1 MEMORANDUM TO: Jim Regg P.I. Supervisor 1 I FROM: Matt HerPera Petroleum Inspector Well Name PRUDHOE BAY UNIT V-229 Insp Num: mitMFH2O1208155605 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, December 10, 2020 SUBJECT: Mechanical Integrity Tests Hilcorp North Slope, LLC V-229 PRUDHOE BAY UNIT V-229 Src: Inspector Reviewed By P.I. Supry Z3;p-- Comm API Well Number 50-029-23464-00-00 Inspector Name: Matt Herrera Permit Number: 212-016-0 Inspection Date: 12/7/2020 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well v 229 T_ a In �� . T-Tubing-,--- -- zlzol6o IT e Test; sPT 'TVD aaoz Tubin lass lass 1475 taxa - YP J� g �Test Sl 1500 [ j 258 2095 20441 2032 PTD - YP P - - - - - - - — 5 504 - soa --- Returned: 12 BBL Pumped: 1.z BBL Ret ` OA 496 i soa � - Interval 4YRTST 'P/F P Notes: MIT -IA performed to 2100 PSI Per Operator Thursday, December 10, 2020 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Wednesday,December 21,2016 P.I.Supervisor )(e (114°16I l t SUBJECT: Mechanical Integrity Tests (' BP EXPLORATION(ALASKA)INC. V-229 FROM: Chuck Scheve PRUDHOE BAY UNIT V-229 Petroleum Inspector Src: Inspector Reviewed B P.I.Supry J6 NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT V-229 API Well Number 50-029-23464-00-00 Inspector Name: Chuck Scheve Permit Number: 212-016-0 Inspection Date: 12/20/2016 Insp Num: mitCS161220150833 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well, V-229 Type Inj j W 4TVD 4407 -Tubing 902 - j 907 900 892 . PTD 2120160 Type Test SPT Test psi 1500 - IA 945 1803 , 1763 - 1754 • Interval 4YRTST PAF P ' OA 395 398 . 396 - 394 . 1_ 1 Notes: SCAt,H�D A�' U 5 201 . Wednesday,December 21,2016 Page 1 of 1 • 111 Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com> Sent: Tuesday, December 13, 2016 10:26 AM To: AK, GWO SUPT Well Integrity;AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS GC2 Facility OTL;AK, OPS Well Pad LV; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers; Peru,Cale Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R;Wallace, Chris D (DOA);AK, GWO SUPT Well Integrity Subject: OPERABLE: INJECTOR V-229 (PTD#2120160) Ready For Injection All, Injector V-229(PTD#2120160) is ready to be put on injection post subsidence remediation work at V pad.The well is now reclassified as Operable. Plan Forward: 1. Operations: Put on water injection. Use caution and anticipate annular thermal expansion. 2. Downhole Diagnostics: Perform 48 month AOGCC MIT-IA once thermally stable Please call with questions or concerns. Thanks, Ryan Holt Well Integrity —GWO Alaska SAAWED JAN 0 2017. (Alternate:Lee Grey) Office: (907)659-5297 • AK, GWO SUPT Well Integrity Sent: day, August 23, 2016 3:52 PM To: AK, OPS OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS GC2 Facility OTL; AK, OPS Well Pad LV; Cismoski, .• A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Peru, Ca - Cc: AK, GWO DHD Well Integrity, • GWO Projects Well Integrity; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; AK, GWO Well Integrity Well Informatio • 'chris.wallace@alaska.gov' Subject: NOT OPERABLE: INJECTOR V-229 • D #2120160) MI Unavailable for AOGCC MIT-IA All, Injector V-229(PTD#2120160) is currently shut in and rolled to MI. ► -e to subsidence issues the well will not return to Ml injection before its AOGCC witnessed MIT-IA is due. This well is now re .ssified as Not Operable. Once MI service is available the well will be POI and pressure tested. Thanks! Jack Lau (Alternate:Adrienne McVey) BP Alaska-Well Integrity Superintendent 1 • S Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWelllntegrityCoordinator@bp.com> Sent: Tuesday, August 23, 2016 3:52 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS GC2 Facility OTL; AK, OPS Well Pad LV; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Prod Controllers; Peru, Cale Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; AK, GWO Well Integrity Well Information;Wallace, Chris D (DOA) Subject: NOT OPERABLE: INJECTOR V-229 (PTD#2120160) MI Unavailable for AOGCC MIT-IA All, Injector V-229 (PTD#2120160) is currently shut in and rolled to MI. Due to subsidence issues the well will not return to MI injection before its AOGCC witnessed MIT-IA is due. This well is now reclassified as Not Operable. Once MI service is available the well will be POI and pressure tested. Thanks! Jack Lau (Alternate:Adrienne McVey) BP Alaska-Well Integrity Superintendent W: 907.564.5102 C: 907.943.0296 H: x2376 WED NOV 0 8 2016 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 02 4 c - 0_1 (p Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RE AN: OVERSIZED: NOTES: 1\ e7.1or Items: ❑ Ma Grayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: g//7//9. /s/ i Project Proofing BY: aZOP Date: q7 /9. /s/ rop Scanning Preparation ca x 30 = to © + 10 = TOTAL PAGES 17 151/- (Count does not include cover sheet) rn BY: Date: t I /s/ Production Scanning Stage 1 Page Count from Scanned File: 7(7 (Count does include cover et) Page Count Matches Number in Scanning Preparation: YES fVJ NO BY: OP Date:ql/ t /s/ 1 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal 'ate: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o 9 o I 1 t �, y -o 9 H p ;f0 o y P v (0 _ to + a vi coo o ZO -p C) U v o M C H 'O E'O r- J _ fA O O 2 P y N la (n O. + m O fC �? o o N 0 a) (1) N Ca �.'.p J O a :.0 0 u) 0 N u) 4 /}I ca D f6 fn O p S� N f0 V a Q Q a N J y` w J O V N D 0 a co N m U co v N S a 7° ••.c aa)) o r H Z o m o o a m= y o E- .N c C 0 0 c a u) w I- V_ Fp- O. •C N -pco `O �' d a N N N O N O 76 N �a Q c m Fo- CO 0 m= o O UU) (U)) E.o Ce + (a)) (2) (a)) a) Z �i u m o) o. m + my H + y aZi a)2 w?o t .2 .2 Z O a) O E N E-I -) o-o cn T v toy y a U) U) a) U) 0 > 0 O C O y t U0 0 a 0 a N •0 W o J <U - Z0 Za Za Z0 > C a) c E a a c H U V O N to •_N a V U to T a a 0- a Y U a m ca C7 mQ Q o �+ Uri 13 o •2W m0 ? Oo O0 Oo Oo N O ... O U + «g U H � 2 N E .-. U) >J >J 5J 5J N m o U � mo F Oa Oa .2 �o -- 0 � rnU) O) a) rno CAO J J O .. N 0 OW (I) 0 0 , a ?�t0 .924) c O. c_ N O N O N O N O IX < E 2 D0 2 20 > JU _I lc 2 F.- Luc)) a0 it >2 >2 >'2 >2 Oz w _ _ _ _ _ _ _ _ _ E. _ _ _ _ _ O 4- c 1:3 N N M M N N M M M M CO M M M M a. 0 y > O O O O O O O O O O O O O O O O W w° •O N N N N N N No N N N N N N N N N O f4 e N N N N sei N N N M M M M M CO co (M M Ce J 6 re CO (D CD 1A N N to in LO 10 Uf) �A O. 1.1.1J X Z c c c c c c c c c c c c c c c W N a) N N N N N N N N N N N V m CO /Q 22 a s a s 0. a 0. 0. a a s a 0 U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z 0. O o 0 0 o O o 0 0 0 0 0 0 0 0 < 0o 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) r- CO N .. N N N N N N N CO) M M M N- N- N- y c A (/) co co CO CO CO (D CO O CO co (O v v v J o. i13 Z O 0. to oli M c '-y O O o 0 o O O O o O 0 IIC !" '� N N N N N N N N N N ONS n O U °° 0 I to li 0.S , o N a Q: Z Q N 10 r a O)Vs H 5� z_ o w �'1 o 0 0 0 G N } O a) Qato CO, CO (f) W J U N N N N O /a) Z o Ts LU 0 w cc 1/4 2 0 a •I— a) C7 CC Q - , / ZI I c Z o 0 o Y w w w Qd U I co 0 '� N •> '> > > E > Z •N •N .N .tl) O 0 y N N N Zas as 2 I co co co co O: Q' ct cC I N us N a) a), a) N 5 @ a) C C C C C 3 C E p p O O N 0 O O O O o O M aoo i O to 1 o o o Z Z g E E w Z 0 0 0 0 0 iv 2 Z 'c 'c c U) O w c E E a) d > > > > H O O O a) a) a) 0 O O O) a) c c c C O 0) ` CO v) N N CO N o o a v) 0 - — _ — Z 0 +. _ _ CO > J O N V v (o O CON CON CON CO CON CO N N% N I O ►. +•+ N a ! N N (O (O N N N N N N N N N 0 1 a) O 2 E '�($ S (8 N N O CO t` N N (N N N-N N N N N Q I z L C d )a N N N N N N N N N N N N N — 2 O 0 a0+ w a z N N N N N N N N N N N N N N N N O Q 0 CO a+ _ LL E M O c 0 a a a s a a a a a 2 m W LL °) rn 2 U 0 0 0 0 0 U U 0 0 0 / _� ? W O J E a Q w _ `- 0 C7 F. Oa m o).3 a 0 0 a p a a a 0 0 a n a a a a a d w 0 3 J o J W W J W W W J J W K W W W W W �__ o I o v9 tz/Zr A N >H >- r r 0 N U CO c(isi i4. C = N N I N C rn Q � Z H ca o a 15 o I a U a m a Q NO N 2 Z cn U U � ` U c Z i it r Ilk CO i� a) E Z /Z = Q E Illiw LL J co N U CNIC /Q p = M p,« a a ii 11111. 1 :6 �° ail • co �w cn z ti Ce Lo III m a) I Jll E a _ N W W Z v rn ui m m rn a C) m Q O m co Z GrG N c Q +� Cr) o 0) 0 11 td y M J a c y = CO i J a O C = CL C U U M � � N 0 0 ti E Q l Uoo U Z 11 CD o Q / /o J N I— O I— ~ N N O 1 1 Z O IC O C 1 !1 C N Z f0 Z' I c/� Q03 ad+ N E 1 �p�/� N l c ,1 V� = 7,5 . p y CD c CcM - '.7. 1E O ..... _ c. I H < ce a_ . Q a ° m O `, ZEO y• v .�' Ii 0 iii UI o 2 o I' I Zr i.,_ m 1 Mil OMj 1 E C /z 111� al . y o U E 1. D c . >j Ico I- CV ,moo w 1 j m N N w E a m N N aa) W t o t od Z. m a 5 u, > E E z a ce Q U N Z O F- co y V f/! C w V a .-j o E C ,as d 0 ,p m OLL o 2 ami , E I o a Iw 0 a c9 0 1 0 McMains, Stephen E (DOA) ( 0 ( From: Ramos, Tania ((Udelhoven Oilfield System Services (UOSS)) <Tania.Ramos@bp.com> Sent: Tuesday, August 06, 2013 3:27 PM To: McMains, Stephen E (DOA) Cc: Bill, Michael L (ASRC); Lastufka,Joseph N; Douglas, David W(Wipro) Subject: FW: Missing Well Logs Attachments: AOGCC Letter 11-15-2006.doc Steve, We had a conversation with Dave Douglas w/PDC concerning BP's internal process for distributing logs and learned of a June 13, 2001 letter from Cammy Taylor concerning electronic submission of logs. According to the letter, graphical files can be submitted in lieu of sepias or bluelines (see attached).We also understand there was an agreement with the Commission to limit the submission of large paper log copies greater than 2 inches. Internally, BP is still sending paper logs less than 3 inches thick. We checked and the V-229 MDT log is about 5 inches thick. Please clarify if either of these guidelines still apply and if you would still want the V-229 MDT log in paper format. Thank you, Tania Ramos Drilling Technologist BP Exploration (Alaska) Inc. 900 E. Benson Blvd MB 7-1 Anchorage, AK 99508 Direct: 907.564.5058 Fax: 907.564-4014 Cell: 907.947.7727 Email:tania.ramosbp.com wa ..vpc4h. ar t7.a€uz. Lara Alaska Region Wells Integrity and Compliance From: McMains, Stephen E (DOA) [mailto:steve.mcmains@alaska.gov] Sent: Tuesday, August 06, 2013 8:32 AM To: Ramos, Tania ((Udelhoven Oilfield System Services (UOSS)) Cc: Okland, Howard D (DOA) Subject: RE: Missing Well Logs Another missing log. PTD 212-016, PBU V-229 AOGCC needs a paper log for MDT that was run during drilling operations and was on the completion report in block 21. 1 Drilling&Measurements = -9.._17_-D 1 � ` c 2525 Gambell Street.Suite 400 1 1-1.J Anchorage AK 99503 Schlumberger Tel(907)273-1700 Fax(907)561-8317 `°' 2-1 Z. ‘ Date: May 28,2013 Well Name: V229 Company: BP Exploration(Alaska),Inc. API Number: 50-029-23464-00 AFE Number: X3-0110G-C:DRILL Location: X=590,587.170 US Feet;Y=5,969,915.840 US Feet Field: Prudhoe Bay/Orion Schrader Bluff Rig: Doyon 25 Drilling and Measurements Field Support: Operations Manager, Mario Pepe Field Service Manager, Brian Muzny Drilling and Measurements Field Crew: Cell Managers, Jessica Dake Arina Fell Cell Engineer, Jessica Dake SERVICES PROVIDED P2-39 Services Services Dates Depth Intervals Directional Survey Service 22-Apr-12 to 2-May-2012 130 feet to 6390 feet TeleScope*Direction&Inclination 23-Apr-12 to 02-May-12 321 feet to 6390 feet VISION*(Resistivity,Gamma Ray) 30-Apr-12 to 02-May-12 3335 feet to 6390 feet VISION*(Neutron,Density Azimuthal) 30-Apr-12 to 02-May-12 3335 feet to 6390 feet OPERATING STATISTICS Total MWD Pumping Time: 95.04 hours Total LWD Pumping Time: 45.64 hours Total MWD Time Below Rotary: 137.25 hours Total LWD Time Below Rotary: 64 hours Total MWD Depth Interval: 6069 feet Total LWD Depth Interval: 3055 feet Total MWD Runs: 3 Total LWD Runs: 1 Total 1 JOB PERFORMANCE Schlumberger Directional V229 The final MWD survey point was located at 6324.34 feet with an inclination of 44.97 degrees and an azimuth of 83.84 degrees. This direction and inclination was projected from the final survey point to TD, which resulted in the following bottom-hole location. Measured Depth: 6390 feet True Vertical Depth: 4892.76 feet Formation Evaluation 12-1/4 inch Surface Section The surface section was drilled from 130 feet to 3335 feet MD in three runs. A motor was used for directional control during the runs. There was no MWD during the first run. Gamma Ray was delivered in real-time and recorded mode for the second and third run. After reached TD,9 5/8 inch casing was run.The final measured bottom-hole temperature was 80.00 degrees Fahrenheit. 8-3/4 inch Production Section: The production hole section of the well was drilled from 3335 feet to 6390 feet MD in one run. A motor was used for directional control during the run.Resistivity, Gamma Ray,APWD,Density and Porosity data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom- hole temperature was 107.6 degrees Fahrenheit. Schlumberger Oilfield Services — Drilling & Measurements appreciates the opportunity to provide BP Exploration(Alaska)with MWD and LWD services. Sincerely, Jessica Dake MWD/LWD Engineer Schlumberger Drilling&Measurements 2 • 1 Schlumberger ez_sr Drilling&Measurements MWD/LWD Log Product Delivery Customer BPXA Dispatched To: Christine Shartzer Well No V-229 Date Dispatched: 28-May-12 Installation/Rig Doyon 25 Dispatched By: Jessica Dake Data No Of Prints No of CDs 1 Surveys 2 Perform Letter 1 Logs: VISION Service MD 2in 9609 to 15778 1 PDF included VISION Service TVD 2in 9609 to 15778 1 PDF included Digital Data )(614te Received By: Please sign and return to: Hector Echeto Drilling&Measurements DSM 2525 Gambell Street,Suite 400 Anchorage,Alaska 99501 hechetoslb.corn Fax:907-561-8317 LWD Log Delivery V1.0,01/22/2010 0 7. Cl)I Pall v1 A ,...... . ,. . ,..... `i` o o 0 0 o 0 0 o C1 Q ,�,I ,;� r 0 0 0 0 0 0 0 0 0 00 0 0 ft g 6 o Fs r O ` , CD o • f'� !I�je F- a).G 0 'Q • r r r O O Y N O o. > ' Q PEI U ^' o v., C E. 0 = ; v ) 0 v M ID mU ;T: ~ a) _op cu v, cn H ,z � � � ,V al a m 0 a, rQ ` \ V1 O O Pap 03 .• 07 M O (44 M N N 00 Tt 00 N N 03 .Val 1- 03 u!) N X a > Q iiilif • J H V Z ". CereCGCCDO2CLMW , LL LL LL LL LL LL LL LL LL LL 0 0 0 0 0 0 0 0 0 0 F- F- F- F- F- F- F- F- F- I- CL •" 0 L3C 0 ® CDC CDQ O y W W W W W w W W W w C9 C7 C7 CD O U' O CD O C7 J J2 3 3 3 3 3 3 3 3 Z Z I- 00000000000 = I- o m o ri M 2 . o X X X X X X X X X X X X m N • ii ui Z X 0 CZ F • F- 0 N I . 62 i 'CID 00 — in co O 1I') M ,r Tr �' 0' CO N M ,- N N N CO In O y .- w NO s- 0 0 0 M O O - N 0 0 O O O O O p O O O O O O ? 0_ O 0 O D O D 00 0 0 0 0 0 Q CID p O 05 Y V Q 4 4 Y Y U X o o Cr) W Z H N !� co W - .-, ,- m N N M 0 Re m d' m 0 ) N � VVVVm mVV C O Ocil 00 -O V, O N Ln N d oY0 CID N Q O, t. '1.:I-1J to N N < N O Q CR co N U 0 ✓ D: O9 Q N c a LU Z E n wE-< Csi N O o N ' J J J 22 ' ami rano s o Z J a °r° J > N N t9 C7 c Q m• LIJ o EL co 3 W ,n r /yam ,: • p u ., .. C� N u go X 0- [0 Q, Q v, o ti N Q - RECEIVED STATE OF ALASKA JUN 0 6 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION QQGCC WELL COMPLETION OR RECOMPLETION REPORT AND L"OG Vv 1a. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25.105 20AAC 25.110 0 Development 0 Exploratory 0 GINJ 0 WINJ WAG - 0 WDSPL 0 Other No.of Completions One CO Service • 0 Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 5/11/2012 212-016 ' 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 4/22/2012 50-029-23464-00-00 ' 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 5/1/2012 PBU V-229 • 4668' FSL, 1716' FEL, Sec. 11,T11 N, R11 E, UM 8. KB(ft above MSL): 95.09' - 15.Field/Pool(s): Top of Productive Horizon: 2498' FSL, 1114' FEL, Sec.2,T11 N, R11 E, UM GL(ft above MSL): 54' • Prudhoe Bay/Orion Schrader Total Depth: 9.Plug Back Depth(MD+TVD): Bluff 2939' FSL,990' FEL, Sec.2,T11 N, R11 E, UM _ 6304' 4832' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 590587 • y- 5969916 ' Zone- ASP4 _ • 6390' 4893' • ADL 028240 • TPI: x- 591149 y- 5973032 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 591267 y- 5973475 Zone- ASP4 None 18. Directional Survey: ® Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1761' 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR,GR/RES/NEU/DEN/PWD, MDT, USIT N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE 1 AMOUNT CASING WT.PER FT. GRADE TOP I BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# A-53 Surface 105' Surface 105' 42" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 41' - 3330' 41' 2825' 12-1/4" 1278 sx DeeoCrete. 398 sx Class'G' 7" 26# L-80 39' , 6388' 39' 4891' 8-3/4" 56 sx LiteCrete.276 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 4-1/2"Gun Diameter,5 spf 3-1/2",9.2#, L-80 6148' 5704'M407',580674479',588074531', MD TVD MD TVD595574585',602774636' 5740'-5794' 4433'-4471' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 5832'-5872' 4497'-4526' 5892'-5918' 4540' 4558' .COM 'P., ,. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 5976'-5990' 4599'-4609' 6045'-6100' 4648' 4687 s I i 2 2375' Freeze Protect w/67 Bbls of Diesel ;req. Li. 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes IS No • Sidewall Core(s)Acquired? 0 Yes IS No - If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water- (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None FBDMS JUN 0 7 2012 67 Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Glji.,/ 4.//2//3 „.14tubmit Original Only l�n/L9 �i-% 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base 1859' 1803' results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 3396' 2863' None Schrader Bluff NA 5528' 4288' Schrader Bluff NB 5561' 4310' Schrader Bluff NC 5611' 4344' Schrader Bluff NE 5623' 4352' Schrader Bluff NF 5683' 4393' Schrader Bluff OA 5741' 4433' Schrader Bluff OBa 5831' 4497' Schrader Bluff OBb 5891' 4539' Schrader Bluff OBc 5976' 4599' Schrader Bluff OBd 6094' 4683' Schrader Bluff OBe 6140' 4716' Schrader Bluff OBf 6203' 4760' Base of Schrader Bluff/Top of 6254' 4796' Colville Mudstone Formation at Total Depth(Name): Colville Mudstone 6254' . 4796' 31.List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the f reg g is tr.e= • rest to the best of my knowledge. L Signed: Joe Lastufka r I �itle: Drilling Technologist Date: b1II2_ PBU V-229 12-016 Prepared By Name/Number. Joe Lastufka, 564-4091 Well Number Permit No./Approval No. Drilling Engineer: Ryan Ciolkosz, 564-5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4-1/16 CW SAFET' ES:WELL REQUIRES A SSSV WHEN ON MI'""' WELLHEAD= FMC PJC DRAFT V-2 2 9 BOT&H..,..PKRS ARE CUT-TO-RELEASE HES PKR ACTUATOR: LEO PRESSURE RATING=7500 PSI. HES PKR PRESSURE KB. ELEV= 95.09' I L J I RATING=5000 PSI(4000 PSI IS 80%OF PKR RATING). BF ELEV= 54' KOP= 953 20"CONDUCTOR, H 105' 37' H4-1/2"X 3-112"XO,ID=2.992" Max Angle= 56° @ 3042' 91.5#,A-53, Datum MD= 5829' ID=19.124" 2498' —13-1/2"HES X NIP„ID=2.813" Datum TVD= 4400 SS Mil GAS LIFT MANDRELS 9-5/8"CSG,40#,L-80 BTC,ID=8.835" H 3330' ST MD ND DEV TYPE VLV LATCH PORT DATE J 10 5675 4387 46 MMG DCR RK - 05/10/12 7'X 3-112' BOT DUAL FEED THRU PKR H 5704' 2 (CUT TO RELEASE), ID=2.965° , 5716' —I3-1/2" HES X NIP,ID=2.813" 7'MARKER PUP w/RA TAG H 5714' �� 5722' —{3-112"NDPG MULTI SUB, ID=2.992" WATER INJECTION MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE Minimum ID = 2.75O' 6125' 11.11 9 5743 4434 45 MMG-W DMY RK 0 05/10/12 I 3-112 HES XN NIPPLE 8 5787 4465 45 MMG-W DMY RK 0 05/10/12 =I 7 5835 4499 45 MMG-W DMY RK 0 05/10/12 6 5864 4520 45 MMG-W DMY RK 0 05/10/12 7"X 3-1/2"BOT SINGLE FEED THRU PKR H 5806" 5 5907 4550 45 MMG-W DMY RK 0 05/10/12 X '- 4 5936 4571 45 MMG-W DMY RK 0 05/10/12 (CUT TO RELEASE),ID=2.965" 3 5982 4603 45 MMG-W DMY RK 0 05/10/12 I 2 6011 4624 45 MMG-W DMY RK 0 05/10/12 3-1/2"NDPG MULTI SUB, ID=2.992" H 5821' - F 1 6065 4663 45 MMG-W DMY RK 0 05/10/12 =1 5818' H3-1/2" HES X NIP,ID=2.813" =1 7"X 3-1/2"BOT SINGLE FEED THRU PKR H 5880' x -'4 (CUT TO RELEASE),ID=2.965" ' I 5892' H3-1/2"HES X NIP,ID=2.813" F 5894' H3-1/2"NDPG MULTI SUB, ID=2.992" IMP =' 7"X 3-1/2" BOT SINGLE FEED THRU PKR —I 5955' (CUT TO RELEASE),ID=2.965" ' ' 2:14 5967' H3-1/2"HES X NIP,,1D=2.813" ■ 5969' 3-112"NDPG MULTI SUB, ID=2.992" PERFORATION SUMMARY Mil REF LOG: USIT ON 05/08/12 g _ 6027' —7"X 3-112' HES SINGLE FEED THRU PKR ANGLE AT TOP PERF: 45° @ 5740' I (CUT TO RELEASE), ID=2.965" Note: Refer to Production DB for historical perf data , ' 6039' H3 12"HES X NIP,ID=2.813" SIZE SPF ZONE INTERVAL Opn/Sqz DATE 4-1/2" 5 OA 5740-5794 0 05/07/12 4-1/2" 5 OBa 5832-5872 0 05/07/12 6045' H3-112'NDPG SINGLE SUB, ID=2.992" 4-1/2" 5 OBb 5892-5918 0 05/07/12 I' LJ 4-1/2" 5 OBC 5976-5990 0 05/07/12 WI 4-1/2' 5 OBd 6045-6100 0 05/07/12 I I 6105' H3-1/2"HES X NIP,I0=2.813" 1E116125' H3-1/2"HES XN NIP, ID=2.750" 3-1/2'TBG,9.2#, L-80 TCII, .0087 bpf,ID=2.992' H 6147' H 6125' H2-1/2'HACPA IN 3-1/2"PX LOCK (05/10/12) PBTD H 6304' 6148' H3-112"WLEG(SCR), ID=2.905" 7"CSG,26#, L-80 TCII, .0383 bpf, ID=6.276" H 6388' ` ��������������.������; HELMO TT NOT LOGGED DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 05111112 -25 INITIAL COMPLETION WELL: V-229 05/17/12 PJC DRLG HO CORRECTIONS PERMIT No: 120160 AP No: 50-029-23464-00 SEC 11,T11N, R11E,611'FNL&1716'FEL BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg .—) DATE: Friday,September 28,2012 P.I.Supervisor f el C 1 '(�� I SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC V-229 FROM: Jeff Jones PRUDHOE BAY UNIT V-229 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry OZ._ NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT V-229 API Well Number 50-029-23464-00-00 Inspector Name: Jeff Jones Permit Number: 212-016-0 Inspection Date: 8/19/2012 Insp Num: mitJJl20927205959 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min - _ I- OA 2472 2475 Well z12o160 �TypeYPIn t SPT TVDp - aao7 _ T-_--_- ;__630 � 2496 •� - _ -' - -- - -- V 229W IA PTD Te Test ITest psi_ 1500 I 176 209 211 213 II — 1633_. 1639 Interval iINITAL - P/F P - Tubing' 1581 1607 Notes: Post rig workover. 1.3 BBLS diesel pumped. 1 well house inspected;no exceptions noted. Friday,September 28,2012 Page 1 of 1 BP AMERICA LOT/ FIT Summary Well Name: V-229 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 04/30/12 LOT 3,355.29 2,824.29 9.20 490.00 1,839.70 12.54 Page 1 of 1 CO O N cCc 0 0 o aa) 3 0 N O O O `) 'O N `d c __ O c c 7 o CA Cl) O ''. = O a OU O Cl) O N c 7 D L CA O- 7 IC CO CS o CD 0 — 0 c =r.) a ci o ao)3 .5 NE 3 9 >. E co 0 7 T CO T N N d 0 -0 c 'O 5 = 7 .c -0 N co ' iO L O N o N C O a) To co E N O 0 E p.0 10'N N N O p_ 7 c (0 o N O N O N N N N 3 'V O N E G G O. a EEEE N m `) -0 NO C c m co W C0 W OQ co coIII co ;,0 in = co O 3 L .5 CA 0 C0 N (U 7 N -- 0 0 N o — C1 m N f0 00 CU v 8 3 0 0 0 E a M a 7 ` 0 a .I W `L `O_ C � 10 1O 47 1007 E To 0o o ` °' n m v v Q2rr v2 O c N O O N c .210ON O ` O ., .§ F L :0 N O. CC a < .c N LE LL U H -r - 0 O)•n M N CO N- - OM) NY CO 1)CO OD VI 01 W O)mr C N r7 a LL 0) 0) 0) 0) O) O) O) E o) 0 0 H 77 n O a- sr CC) M CO N O r- v O O ai >itt•O CO O CO VINO. Nr- N cO(N V r 10 12 NN,_ CD CO CO CD d) a I co d c1 up I o a7)'c° I N o Gail , 7 a LL W co 0 I OD On (0 0 M 10 0 Op00 n co c, N- CO co 2' co '1T O) M 0) M 0- y- C1) Cfl n co co V CO CD CD O DOD M, ,_ co co O v71a � r.) v N: � � 0) N- (0 t 2 c mm In til 0) E .4 Ny 7 N > m o 1 LL LL V 0 Cf) s- V N N O)— CO V ,- .(0 0 O '- '- M CO it U) N-, CO OO f0 '- N N N N N N N N N C') C') C•) - CCS N N N N N N N N N N N N 7) N O E O as co 0) ,r\o — — N- CA CAO C7:00 CO 00 C7-000 O C) O C+) r) n O 0:11) CO N p O.1.; h W1'1'3' - N N N N M O N N M IO NMN N .O m N N N NN N N N N.� O °� N NNN N N N N N co co M N `O N N N N e'er 7 >, as CO▪ CM0 n0.- � U) o � Lc) � N- co 10 mCO 0�{{A Nm- C') C) CD1 V Cf) UC) CC) U) 1C) f) '� vv vV � sr vvvv VV v .3. � M� U)� � .�O co t 0 • 1 CO CO CO tp n 0) OO O ,— O CO• CO 00 0 0)1p 10 n O) 0+) Y 0) 0) 03 00 1n CO r 0) O)On P Op CO n n n OD CO co 0) 0) 0 0 O O 0)n 0 CO 0) L a CO tO CO 01 0 10 CC) Cf) Cf) CO 0 CD CD U)U)CD CO CO Eii a. V , W 0 .c C o A .Q 'O'O 'O 5 A 'O co c) 0 nN 00 0000 000000 0 0 x000.00 North America -ALASKA- BP Page 1 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/18/2012 '00:00 - 04:30 4.50 RIGD P PRE SLIP AND CUT 320'OF DRILLING LINE: -PJSM WITH RIG CREW PRIOR TO TASK. -MANRIDER OPS: HANG OF BLOCKS FOR SLIP AND CUT. -CUT 320'OF 1-3/8"DRILLING LINE. 04:30 - 11:00 6.50 RIGD P PRE SCOPE DERRICK DOWN: -PJSM PRIOR TO STARTING TASK. -MANRIDER OPS: PREP DERRICK FOR SCOPING DOWN. BRIDAL UP AND SCOPE DOWN DERRICK. -SECURE TOP DRIVE FOR RIG MOVE. .SIMOPS:CONTINUE TO PREP MOTOR, PIT __ _ AND PUMP COMPLEXES FOR RIG MOVE. 11:00 - 12:00 1.00 RIGD P PRE SPOOL OFF DRILLING LINE AND PULL DRILLING LINE FROM DEADMAN. SIMOPS:CONTINUE TO PREP MOTOR, PIT • • AND PUMP COMPLEXES FOR RIG MOVE. 'SWAP TO COLDSTARTS. 12:00 13:30 1.50 RIGD P PRE SECURE THE STABBING BOARD IN THE DERRICK. REMOVE PINS FROM THE"C" SECTION. RAISE"C"SECTION FOR RIG MOVE AND SECURE WITH PINS. SECURE ROLLING WIND WALLS. • SIMOPS:DISCONNECT ELECTRICAL LINES FROM ALL COMPLEXES. BLOW DOWN RIG STEAM LINES. 13:30 - 14:30 1.00 RIGD P PRE REMOVE AIR LINES,VAC LINES,GRAY WATER LINES AND WATER LINES IN PUMP AND POWER COMPLEX INTERCONNECTS. SIMOPS:HELD PJSM FOR BLIND PICK TO REMOVE AND REPLACE THE DRILLING LINE SPOOL. 14:30 15:00 I 0.50 RIGD P PRE RAISE STAIRS AND SECURE WALKWAYS ON POWER COMPLEX. MOVE POWER COMPLEX 10'TO THE EAST TO STAGE FOR RIG MOVE. • SIMOPS: RIG UP AND VERIFY ALL EQUIPMENT IS IN PLACE AND SUITABLE FOR BLIND PICK TO REMOVE AND REPLACE THE DRILLING LINE SPOOL. • 15:00 - 15:30 0.50 RIGD P PRE •RAISE STAIRS AND SECURE WALKWAYS ON PUMP COMPLEX. MOVE PUMP COMPLEX 10' TO THE NORTH TO STAGE FOR RIG MOVE. SIMOPS:CONTINUE TO RIG UP AND VERIFY ALL EQUIPMENT IS IN PLACE AND SUITABLE 'FOR BLIND PICK TO REMOVE AND REPLACE THE DRILLING LINE SPOOL. Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 2 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date:5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:OOAM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. 1UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:00 0.50 RIGD P PRE SECURE DOORWAYS ON THE PIT COMPLEX. MOVE PIT COMPLEX 5'TO THE NORTH AND STAGE FOR RIG MOVE. SIMOPS:CONTINUE TO RIG UP AND VERIFY ALL EQUIPMENT IS IN PLACE AND SUITABLE 'FOR BLIND PICK TO REMOVE AND REPLACE THE DRILLING LINE SPOOL. 16:00 - 19:30 3.50 RIGD P PRE POSITION POWER COMPLEX TO REMOVE THE RIG MATS FROM UNDERNEATH. REMOVE THE RIG MATS FROM UNDER THE POWER COMPLEX AND STACK THEM FOR TRANSPORT TO V PAD. SIMOPS:REMOVE PINS AND LIFT OFF LID ON DRILLING LINE SHED WITH CRANE. RIG UP AND REMOVE EMPTY DRILLING LINE SPOOL FROM SHED. PREP NEW DRILLING LINE SPOOL AND LIFT INTO PLACE WITH CRANE. RE-INSTALL LID ON DRILLING LINE SHED AND SECURE WITH PINS. 19:30 - 21:00 1.50 RIGD P PRE LOWER CATTLE CHUTE INTO STORED POSITION ON TOP OF PIPE SHED. -PJSM WITH RIG CREW PRIOR TO TASK. SIMOPS:CONTINUE TO REMOVE RIG MATS FROM UNDER COMPLEXES AND STACK THEM FOR TRANSPORT TO V PAD. 21:00 - 21:30 0.50 RIGD P PRE SKID RIG FLOOR INTO POSITION TO LOWER THE DERRICK. -PJSM WITH RIG CREW PRIOR TO TASK. 21:30 - 00:00 2.50 RIGD N WAIT PRE WAIT ON PEAK TRUCKS FOR RIG MOVE LOWER THE DERRICK FOR RIG MOVE WHILE WAITING ON TRUCKS. I-PJSM WITH RIG CREW PRIOR TO TASK. 4/19/2012 00:00 - 02:00 2.00 MOB N WAIT PRE WAIT ON PEAK TRUCKS FOR RIG MOVE PLACE PIT, PUMP AND POWER COMPLEXES ON SUSPENSIONS FOR MOVE TO V-229. SIMOPS:SECURE DERRICK FOR RIG MOVE. 02:00 - 04:00 2.00 MOB N WAIT PRE CONTINUE WAITING ON PEAK TRUCKS FOR RIG MOVE. PREP PIPE AND DRILL COMPLEXES FOR RIG MOVE. -PEAK TRUCKS ON LOCATION AT 03:30. 04:00 - 06:00 2.00 MOB P PRE HOOK UP TRUCKS TO RIG COMPLEXES FOR MOVE TO V-229. -PJSM WITH PEAK DRIVERS AND RIG CREW. -POSITION TRUCKS AND EQUIPMENT TO HOOK UP SOWS TO O RIGCOMPLEXES. 06:00 - 07:30 1.50 MOB P PRE MOVE PIPESHED FROM SUB 07:30 - 08:30 1.00 MOB N WAIT PRE WAITING ON SECURITY SIMOPS:CONTINUE TO MOVE PIPESHED FROM SUB AND STAGE FOR MOVE. INSTALL JEEP TO SUB. Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 3 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) '08:30 - 13:30 5.00 MOB P PRE MOVE PIT,PUMP AND POWER COMPLEXES FROM P2-39 TO V-229. 'SIMOPS:MOVE WELLS GROUP EQUIPMENT FROM IN FRONT OF V-229. BELL AND ASSOCIATES SURVEYED V-229. REMOVE LADDERS FROM WELL HOUSES NEAR V-229. SET WELL HOUSE IN PLACE FOR DRILLING V-229. 13:30 - 15:00 1.50 MOB N RREP PRE PIT COMPLEX HADA FLAT TIRE WHILE CROSSING THE CENTRAL KUPARUK BRIDGE. 15:00 - 19:30 4.50 MOB P PRE 'CONTINUE TO MOVE PIT,PUMP AND POWER COMPLEXES FROM P2-39 TO V-229. STAGE COMPLEXES ON THE EAST SIDE OF V-PAD. SIMOPS:MOVE WELLS GROUP EQUIPMENT FROM IN FRONT OF V-229. BELL AND ASSOCIATES SURVEYED V-229. REMOVE LADDERS FROM WELL HOUSES NEAR V-229. SET WELL HOUSE IN PLACE FOR DRILLING V-229. PLACE RIG MATS ON LOCATION FOR RIG UP. 19:30 - 20:00 0.50 MOB , P PRE RETURN WITH TRUCKS TO P2-39 AND HOOK UP TRUCKS TO PIPE, DRILL AND CASING i COMPLEXES. 20:00 - 00:00 4.00 MOB P PRE MOVE PIPE,DRILL AND CASING COMPLEXES FROM P2-39 TO V-229. 4/20/2012 00:00 - 03:30 3.50 MOB - P PRE CONTINUE TO MOVE PIPE, DRILL AND CASING COMPLEXES FROM P2-39 TO V-PAD. 03:30 - 04:30 1.00 MOB P PRE STAGE DRILL AND PIPE COMPLEX WITH TRUCKS ON V-PAD. 04:30 - 07:30 3.00 MOB P PRE REMOVE JEEP FROM DRILL COMPLEX AND SPOT COMPLEX OVER V-229. 07:30 - 11:00 3.50 MOB P PRE MANEUVER PIPE, PUMP,PIT AND POWER COMPLEXES INTO PLACE AND UN PIN THE SUSPENSIONS. AOGCC,MATT HERRERA,NOTIFIED UP UPCOMING DIVERTER TEST AT 08:00. 11:00 - 16:00 5.00 MOB P PRE WALK THE PIPE COMPLEX INTO POSITION AND CONNECT IT TO THE DRILL COMPLEX. 16:00 - 18:00 2.00 MOB P PRE SHIM AND LEVEL THE DRILL AND PIPE COMPLEXES. 18:00 - 20:30 2.50 MOB P PRE RAISE AND PIN THE DERRICK. -PJSM WITH RIG CREW PRIOR TO TASK. 20:30 - 21:30 1.00 MOB P PRE INSTALL FLOOR PLATES AND SKID FLOOR BACK INTO PLACE. INSTALL HANDRAILS AND CLOSE LARGE DOORS. 21:30 - 23:30 2.00 MOB P PRE SPOT PIT AND CASING COMPLEXES IN PLACE. RIG UP THE SHORT GAS BUSTER HOSE. RIG UP ELECTRIC CABLES BETWEEN THE UNITS. 23:30 - 00:00 0.50 MOB P PRE SPOT PUMP COMPLEX. 4/21/2012 00:00 - 02:00 2.00 MOB P PRE CONTINUE TO SPOT PUMP AND POWER COMPLEXES. SIMOPS: RIG UP STEAM,WATER AND AIR LINES THROUGHOUT RIG. Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 4 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:30 1.50 MOB P PRE LOWER AND PIN"C"SECTION IN PLACE. PJSM PRIOR TO STARTING TASK. SIMOPS:CONTINUE TO RIG UP STEAM, WATER AND AIR LINES THROUGHOUT RIG. 03:30 - 05:30 2.00 MOB P PRE RAISE CATTLE CHUTE AND PIN IN PLACE. -PJSM PRIOR TO STARTING TASK. SIMOPS:CONTINUE TO RIG UP STEAM, WATER AND AIR LINES THROUGHOUT RIG. 05:30 - 08:30 3.00 MOB P PRE CONTINUE TO RIG UP LINES AT INTERCONNECTS -SWAP POWER FROM COLD START GEN-SETS TO RIG POWER MODULE -PREPARE TO SCOPE DERRICK UP. 08:30 - 12:00 3.50 MOB P I PRE SPOOL LINE BACK ONTO DRAW WORKS -UN-PIN TOP DRIVE. -BRIDLE&SCOPE DERRICK UP. -BEGIN RIG DOWN OF BRIDAL LINES. '12:00 - 13:30 1.50 MOB P PRE FINISH RIG DOWN OF BRIDAL LINES -TIE-BACK TOP DRIVE HANGING LINE. • SIMOPS:CALIBRATE&TEST GAS ALARMS. 13:30 - 16:30 3.00 RIGU P PRE RIG UP KELLY HOSE SIMOPS:WORK ON FLANGING UP DIVERTER LINE. RIG ACCEPTED AT 15:00 HRS ON 4/21/2012 16:30 - 17:00 0.50 RIGU P PRE INSTALL BAILS 17:00 - 18:00 1.00 RIGU P PRE PICK UP 17'SURFACE RISER&SET IN PLACE WITH BLOCKS -CONTINUE TO FLANGE UP DIVERTER LINE 18:00 - 19:30 1.50 RIGU P PRE INSTALL 21-1/4"SURFACE ANNULAR ON TOP OF SURFACE RISER -CONTINUE TO FLANGE UP DIVERTER LINE. 19:30 - 00:00 4.50 RIGU P PRE SLIDE JOE'S BOX INTO PLACE, CUT LOW PRESSURE RISER TO LENGTH AND INSTALL -HANG SELF-RETRACTING SAFETY LANYARDS IN THE DERRICK. -GREASE CROWN. -CONNECT POWER TO DERRICK LIGHTS. -CONTINUE TO FLANGE UP DIVERTER LINE. 4/22/2012 00:00 - 01:30 1.50 BOPSUR P PRE TIGHTEN BOLTS ON SURFACE RISER& ANNULAR -INSTALL LOW PRESSURE RISER. Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 5 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 06:00 4.50 RIGU P PRE FINISH RIGGING UP ON V-229 -SEAL JOE'S BOX -INSTALL STRIP-O-MATIC. -R/U FLOW LINE. -REMOVE FLOW PADDLES FROM FLOW LINE. R/U FLOW LINE JETS&HOLE FILL. -R/U DRAIN LINES. -R/U TURN BUCKLES ON STACK. -HOOK UP KOOMEY HOSES TO ANNULAR& KNIFE VALVE- -SERVICE&INSTALL PS21 SLIPS. -INSTALL 4"ELEVATORS ON TOP DRIVE. SIMOPS: PREP PIPE SHED FOR 4"DP, LOAD 344"DP SINGLES&14 JOINTSOFHWDP INTO PIPE SHED,PREP&STOCK PITS FOR SURFACE DRILLING, PRIME MUD PUMPS. 06:00 - 06:30 0.50 RIGU P i PRE CLEAN&CLEAR THE RIG FLOOR AND BOP DECK -PICK UP TOOLS. 06:30 - 07:30 1.00 RIGU P PRE ADJUST KELLY HOSE TO KEEP CLEAR OF OFF-DRILLER SIDE BOARD WHILE RACKING PIPE 07:30 - 08:30 1.00 RIGU P PRE 'PICK UP 4"DP SINGLES FROM PIPE SHED& BUILD 2 STANDS 08:30 - 09:30 1.00 BOPSUR P PRE PERFORM KOOMEY DRAWDOWN TEST. -ACCUMULATOR PSI=3000. -PSI AFTER CLOSING 21-1/4"DIVERTER= 2200. -KNIFE VALVE OPENING TIME= 13 SECONDS A.)(- ANNULAR CLOSING TIME=32 SECONDS -18 SECONDS TO RECOVER 200 PSI WITH 2 ELECTRIC PUMPS. -58 SECONDS TO RECOVER TO FULL PRESSURE WITH 2 ELECTRIC PUMPS AND 2 AIR PUMPS. -6 NITROGEN BOTTLES AVERAGE PSI=2240. TEST WITNESS WAIVED BY AOGCC CHUCK SCHEVE 09:30 - 10:00 0.50 RIGU P PRE PERFORM RIG EVACUATION DRILL -RESPONSE TIME=4 MIN 20 SEC 10:00 - 14:30 4.50 RIGU P PRE CONTINUE PICKING UP 4"DP FROM PIPE SHED L-_TOTAL OF 34 STANDS IN DERRICK 14:30 - 16:00 1.50 RIGU P PRE CHANGEOUT PS21 SLIP INSERTS -MAKE UP 6 1/4"DRILL COLLAR STANDS 16:00 - 17:00 ' 1.00 RIGU P PRE CHANGEOUT PS21 SLIP INSERTS -PICK UP STABILIZER,UBHO,&CROSS OVERS. 17:00 - 19:00 2.00 RIGU P PRE RIG UP SPERRY WIRELINE FOR RUNNING GYRO 19:00 - 21:00 2.00 DRILL P SURF MAKE UP 9 5/8"1.5 DEG MOTOR,12 114"USED MILL TOOTH BIT, UBHO&CROSS OVERS 21:00 - 21:30 0.50 DRILL P SURF DRILL OUT ICE PLUG FROM 45'MD TO 120' 'MD, DRILL TO 143'MD -450 GPM,450 PSI -40 RPM,TQ= 1-2K, WOB=5K -P/U WT=61K,S/0 WT=51K.ROT WT=53K Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 6 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:OOAM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 143'MD TO 155'MD '-RUN GYRO SURVEY AT EVERY CONNECTION -450 GPM,450 PSI -40 RPM,TQ= 1-2K, -WOB=5K P/U WT=61K,S/O WT=51K. ROT WT=53K ART=0.67 HRS,ADT=0.67 HRS,TOTAL BIT HRS.=0.67 4/23/2012 00:00 - 02:00 2.00 DRILL P SURF DRILL 12 1/4'SURFACE HOLE FROM 155'MD TO 243'MD -RUN GYRO SURVEY EVERY STAND -404 GPM,420 PSI ON/380 PSI OFF -40 RPM,TQ= 1-2K ON/0.5K OFF -WOB=12K -P/U WT=51K,S/0 WT=62K.ROT WT=52K 02:00 - 04:30 2.50 DRILL P SURF FLOWLINE INTERMITTENTLY PLUGGING AND LOOSING PRIME TO MUD PUMPS -STAND BACK HWDP STAND#2 -WORK PIPE AND CIRCULATE WHILE TROUBLESHOOTING JET LINES AND MUD PUMPS -P/U HWDP STAND#2 04:30 - 07:30 3.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 243'MD TO 321'MD -RUN GYRO SURVEY EVERY STAND -425 GPM,560 PSI ON/490 PSI OFF -40 RPM,TQ=8-10K ON 0.5K OFF WOB=10K -P/U WT=52K,S/O WT=63K. ROT WT=52K 07:30 - 08:30 1.00 DRILL P SURF PULL OUT OF HOLE FROM 321'MD TO 54'MD 08:30 - 11:30 3.00 DRILL P SURF PULL OUT OF HOLE WITH 12 1/4"SURFACE BHA#1 &BREAK OUT UBHO M/U 12 1/4"SURFACE BHA#2&RUN IN HOLE TO 277'MD 11:30 - 12:00 0.50 DRILL P SURF RUN GYRO SURVEY AT 277 MD TO CONFIRM ORIENTATION RIH TO 321'MD 12:00 - 00:00 12.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 321'MD TO 1,100'MD i -523 GPM,1,330 PSI ON/1,225 PSI OFF -40RPM,TQ=5K ON/1.5KOFF -WOB=12-30K MW 9.0 IN/9.0OUT -P/U WT=80K, S/O WT=85K. ROT WT=82K -CLEAN MWD SURVEYS AT 662' FLOW PADDLE INSTALLED AT 1,000'MD ADT=6.40 HRS,ART=2.87,AST=3.53 HRS, TOTAL BIT HRS= 10.11 Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 7 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type:DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/24/2012 00:00 - 07:00 7.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 1,100' MD TO 1,781'MD,1,730'TVD -536 GPM,1,800 PSI ON/1,565 PSI OFF 40 RPM,TQ=5-6K ON/1.5K OFF -WOB=25-30K MW 9.0 IN/9.0 OUT -P/U WT=90K,S/O WT=90K.ROT WT=90K ADT=4.59 HRS,ART=3.46,AST=1.13 HRS, TOTAL BIT HRS=14.7 07:00 - 08:00 1.00 DRILL P SURF ROTATE AND RECIPROCATE WHILE CIRCULATING 2 BOTTOMS UP -500 GPM/1380 PSI -40 RPM/2K TQ MONITOR WELL FOR 10 MIN-STATIC { MW9.01N/9.0OUT 08:00 - 10:00 2.00 DRILL P SURF POOH FROM 1,686'MD TO 644'MD -WORK THROUGH TIGHT SPOTS AT 1120', 1030',AND 987'MD 10:00 - 11:30 1.50 DRILL P SURF STAND BACK HWDP,JARS,AND DRILL COLLARS. -L/D UBHO BIT GRADE 2-6-WT-A-E-1-SS-BHA -CHANGE OUT BIT FOR BHA#3 11:30 - 12:30 1.00 DRILL P SURF CLEAN AND CLEAR RIG FLOOR 12:30 - 13:00 0.50 DRILL P SURF GREASE WASHPIPE AND SWIVEL PACKING 13:00 - 17:00 4.00 DRILL P SURF RIH WITH BHA#3 -WASH DOWN FROM 1119'TO 1781' -147 GPM/350 PSI 17:00 - 00:00 7.00 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 1,781' MD TO 2,726'MD,1,471'TVD -600 GPM,2520 PSI ON/2225 PSI OFF -80 RPM,TQ=4-7K ON/2-3K OFF -WOB=5-30K -MW 9.2 IN/9.2 OUT -P/U WT= 104K, S/0 WT=90K. ROT WT=96K ADT=3.3 HRS,ART= 1.03,AST=2.27 HRS, TOTAL BIT HRS=3.3 4/25/2012 00:00 - 04:30 4.50 DRILL P SURF DRILL 12 1/4"SURFACE HOLE FROM 2,726' MD TO 3315'MD -600 GPM,2750 PSI ON/2610 PSI OFF -80 RPM,TQ=5-6K ON/3-4K OFF -WOB=25K -MW 9.4IN/9.4OUT -P/U WT= 107K, 5/0 WT=95K. ROT WT= 102K ADT=2.1 HRS,ART=1.63,AST=0.47 HRS, TOTAL BIT HRS=5.4 MINOR HYDRATES SEEN DURING DRILLING 04:30 - 06:00 1.50 DRILL P SURF CIRCULATE 3 BOTTOMS UP WHILE ROTATING AND RECIPROCATING -700 GPM,3360 PSI -100 RPM,3-5K TQ -P/U WT=102K, S/0 WT=96K. ROT WT=97K MONITOR WELL FOR 10 MIN-STATIC MW9.4IN/9.4OUT Printed 5/29/2012 10:28.52AM North America -ALASKA- BP Page 8 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 09:30 3.50 DRILL P SURF POOH ON ELEVATORS TO 3150'MD -ENCOUNTERED TIGHT HOLE AT 3150'MD PUMP OUT OF HOLE FROM 3150'TO 1876'MD -425 GPM,1500 PSI '09:30 - 11:00 1.50 DRILL P SURF CIRCULATE 3 BOTTOMS UP -550 GPM,1800 PSI MONITOR WELL FOR 10 MIN-STATIC MW 9.4IN/9.4OUT 11:00 - 12:00 1.00 DRILL P SURF POOH ON ELEVATORS FROM 1775'MD TO 1100'MD -TIGHT HOLE ENCOUNTERED FROM 1200'TO 1100'MD -UNABLE TO WORK PAST 1100' 12:00 - 12:30 0.50 ' DRILL P SURF PUMP OUT OF HOLE FROM 1100'MD TO 925' MD -126 GPM,275 PSI 12:30 - 13:00 0.50 DRILL P SURF CBU WHILE ROTATING AND RECIPROCATING -425 GPM,925 PSI -40 RPM,1.5K TQ 13:00 - 14:00 , 1.00 DRILL P SURF RIH ON ELEVATORS FROM 830'TO 1400'MD -UNABLE TO WORK PAST TIGHT SPOT AT 1400'MD 14:00 - 16:30 2.50 DRILL P SURF BACKREAM FROM 1400'TO 1020'MD -425 GPM,950 PSI -40 RPM,1-2K TQ 16:30 - 19:00 2.50 DRILL P SURF RIH ON ELEVATORS FROM 1020'TO 3019'MD -WASH EVERY 5TH STAND DOWN AT 126 'GPM,300 PSI -ROTATE THROUGH TIGHT SPOTS AT 2400' AND 2870'MD 19:00 - 19:30 0.50 DRILL P ' SURF ESTABLISH DRILLING PARAMETERS AND WASH TO BOTTOM DRILL ADDITIONAL 20'TO A FINAL TD OF 3335'MD,2826'TVD -600 GPM,2750 PSI ON/2610 PSI OFF -80 RPM,TQ=4K ON -WOB=20K 19:30 - 21:00 1.50 DRILL P SURF CIRCULATE 3 BOTTOMS UP WHILE ROTATING AND RECIPROCATING -650 GPM,3350 PSI -100 RPM,3-4K TO -P/U= 108K, S/O=90K MONITOR WELL FOR 10 MIN-STATIC MW 9.4 IN/9.4 OUT 21:00 - 00:00 3.00 DRILL P SURF I POOH ON ELEVATORS FROM 3335'TO 1100' MD 4/26/2012 00:00 - 00:30 0.50 DRILL P SURF FINISH WIPER TRIP TO 925'MD -POOH CLEAN ON ELEVATORS 00:30 - 03:00 2.50 DRILL P SURF RIH ON ELEVATORS FROM 925'TO 3150' -WORK PAST TIGHT HOLE FROM 1900'TO 2100' -WASH THROUGH TIGHT SPOT AT 3000'AT 126 GPM,375 PSI 03:00 - 03:30 0.50 DRILL P SURF WASH THROUGH TIGHT SPOT AT 3000'AND WASH TO BOTTOM -126 GPM,350 PSI Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 9 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 03:30 - 05:30 2.00 DRILL P SURF CIRCULATE 3 BOTTOMS UP WHILE ROTATING AND RECIPROCATING -700 GPM,3,380 PSI -100 RPM,TQ=4K 05:30 - 06:00 0.50 DRILL P SURF MONITOR WELL 10 MIN AND OBTAIN PARAMETERS -WELL STATIC -P/U WT= 109K, S/O WT=87K 06:00 - 08:30 2.50 DRILL P SURF PULL OUT OF HOLE ON ELEVATORS FROM 3,206'MD TO 640'MD 08:30 - 11:30 3.00 DRILL P SURF LAY DOWN 12 1/4"SURFACE BHA -RACK BACK HWDP,JARS&DRILL COLLARS -BIT GRADE 1-1-WT-A-E-I-NO-TD 11:30 - 13:00 1.50 CASING P SURF CLEAN&CLEAR RIG FLOOR -SEND OUT BHA#3 -P/U CASING RUNNING TOOLS. _ -DRAIN STACK 13:00 - 14:30 1.50 CASING P SURF SERVICE RIG&PREPARE TO RIG UP VOLANT TOOL -CHANGEOUT SAVER SUB FOR VOLANT 'TOOL RIG UP. -SERVICE TOP DRIVE. -CHECK FLUIDS&GREASE FITTINGS. 14:30 - 15:00 0.50 CASING , P I SURF PULL PS-21 SLIPS&STRIP-O-MATIC -CLEAN, INSPECT,AND GREASE BOTH PIECES OF EQUIPMENT. 15:00 - 16:00 1.00 CASING P SURF RIG UP TO RUN 9 5/8"40#L-80 BTC SURFACE CASING -RIG UP VOLANT TOOOL TO TOP DRIVE. -INSTALL BAIL EXTENSIONS&SIDE DOOR ELEVATORS. 16:00 - 16:30 0.50 CASING P SURF PERFORM DUMMY RUN WITH LANDING JT& HANGER AND MARK PIPE 16:30 - 17:00 0.50 CASING P SURF PICKUP 9 5/8"REAMER SHOE AND JOINT#1 -ENSURE SLIPS,DOG COLLAR,AND VOLANT TOOL ALL FIT PIPE. 17:00 - 17:30 0.50 CASING P SURF HOLD PRE-JOB MEETING WITH RIG CREW,GBR HANDS,TOOL PUSHER,AND WSL -DISCUSS RUNNING CASING WITH VOLANT TOOL,HAZZARD MITIGATION,AND WELL CONTROL. 17:30 - 00:00 6.50 CASING P SURF RUN 9 5/8"40#L-80 BTC CASING PER PROGRAM WITH VOLANT CASING RUNNING TOOL TO 1,550'MD -PICK UP SHOE TRACK&CHECK FLOATS (FLOATS HOLDING). -RUN 9 5/8"SURFACE CASING FILLING EVERY JOINT. -TORQUE RING INSTALLED IN EVERY CONNECTION -M/U TORQUE 18K FT-LBS -TOP OFF EVERY 10 JOINTS. -5 BBL LOSSES PER 10 JOINTS OF CASING. -P/U WT=74K,S/O WT=74K 4/27/2012 00:00 - 01:00 1.00 CASING P SURF INSTALL PS21 CENTERING GUIDES -LAY DOWN CASING JOINT#45&REPLACE WITH JOINT"A" Printed 5/29/2012 10:28:52AM North America-ALASKA- BP Page 10 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 06:00 5.00 CASING P SURF CONTINUE RUNNING 95/8"40#L-80 BTC CASING WITH VOLANT CRT TO 3,330'MD -RUN 9 5/8"SURFACE CASING FILLING EVERY JOINT TORQUE RING INSTALLED IN EVERY CONNECTION -M/U TORQUE 18K FT-LBS -TOP OFF EVERY 10 JOINTS -TIGHT SPOT AT 2200'MD,WORK PAST WHILE PUMPING AT 3 BPM 106:00 - 06:30 0.50 CASING P SURF MAKE UP 9 5/8"FLUTED HANGER&LANDING JOINT 06:30 - 10:00 3.50 CASING P SURF RECIPROCATE CASING WHILE CONDITIONING MUD FOR CEMENT JOB STAGE UP TO 6 BPM,135 PSI -BROUGHT MUD PROPERTIES DOWN TO<20 YP AND 50 VIS. -PRESSURE TEST CEMENT LINES 250 PSI LOW/3,500 PSI HIGH 10:00 - 10:30 0.50 CEMT P SURF RIG UP CEMENT HOSE TO PUMP IN SUB ON VOLANT CRT -TEST TO 250 PSI LOW/3,500 PSI HIGH -BREAK CIRCULATION&STAGE PUMPS -255 GPM,130 PSI 10:30 - 11:00 0.50 CEMT P SURF HOLD PRE-JOB SAFETY MEETING WITH SCHLUMBERGER, RIG CREW,GBR, -r CH2MHILL,AND MI•SWACO PERSONNEL. 11:00 - 14:30 3.50 CEMT P SURF CEMENT 9 5/8"SURFACE CASING WITH �/ RECIPROCATION AS FOLLOWS: C!" �-PUMP 104 BBLS OF 10.1 PPG MUDPUSH c i-RELEASE VOLANT TOOL AND DROP I BOTTOM PLUG 1 1 -PUMP 421 BBLS(1380 SX) 11.0 PPG LEAD CEMENT.YIELD 1.85 CUFT/SK I-RECIPROCATE CASING UNTIL 344 BBLS AWAY AND LOSS OF 25K S/O WT, LAND ICASING HANGER ON LANDING RING I-PUMP 83 BBLS(420 SX) 15.8 PPG TAIL CEMENT.YIELD 1.17 CUFT/SK -RELEASE VOLANT TOOL AND DROP TOP PLUG. -CHASE PLUG W/10 BBLS WATER SWAP TO RIG AND DISPLACE WITH 9.4 PPG SPUD MUD -BEGIN DISPLACEMENT AT 7 BPM,500 PSI -BUMP PLUG AT 236 BBLS AT 1,000 PSI -PRESSURE UP 500 PSI OVER FCP, HOLD FOR 5 MIN -BLEED OFF PRESSURE AND CHECK FLOATS, FLOATS HOLDING CMT IN PLACE 14:30 HRS -25 BBLS OF CONTAMINATED CEMENT BACK TO SURFACE OVER LAST 70 BBLS OF RETURNS -DECISION MADE TO PERFORM CEMENT TOP JOB Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 11 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:OOAM Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 22:00 7.50 CEMT P SURF RIG DOWN 95/8"CASING RUNNING TOOLS& DIVERTER SYSTEM -R/D VOLANT TOOL -DRAIN&RINSE STACK -PULL LANDING JOINT -RINSE JOES BOX -PULL LOW PRESSURE RISER -FUNCTION, RINSE,AND REMOVE 21-1/4" HYDRIL SURFACE BAG -PULL SURFACE RISER&SEND OUT THE BEAVER SLIDE R/D DIVERTER LINE 22:00 - 00:00 2.00 CASING P I SURF REMOVE FLOOR PLATE IN BOP DECK& REMOVE DIVERTER TEE 4/28/2012 00:00 - 02:00 2.00 CEMT P SURF CONTINUE TO REMOVE DIVERTER TEE AND RE-INSTALL FLOOR PLATE IN BOP DECK. 02:00 - 03:30 1.50 CEMT N CEMT SURF R/U FOR CEMENT TOP JOB -RUN 1/2"SCHEDULE 80 PIPE DOWN THROUGH HANGER FLUTES -TAG AT 124'BELOW HANGER -UNABLE TO ESTABLISH CIRCULATION ON 1ST ATTEMPT AT 700 PSI -PULL STRING AND REPLACE BOTTOM JOINT 03:30 - 09:00 5.50 CEMT N CEMT SURF R/U FOR CEMENT TOP JOB RUN 1/2"SCHEDULE 80 PIPE DOWN THROUGH HANGER FLUTES -TAG AT 124'BELOW HANGER -UNABLE TO ESTABLISH CIRCULATION ON 2ND ATTEMPT AT 1000 PSI -POOH TO 60'MD AND ESTABLISH CIRCULATION AT 1 BPM,700 PSI -CIRCULATE AND FLUSH OUT CONDUCTOR AND HANGER. -PUMP IN HOLE FROM 60'MD TO 124'MD WITH TEST PUMP. 09:00 - 10:00 1.00 CEMT N CEMT SURF CIRCULATE AND STAGE PUMPS UP TO 1 BPM,950 PSI -PUMP 26 BBLS AROUND -POOH AND UD 1/2"PIPE -SIMOPS: REMOVE BOLTS FROM 13-5/8" ANNULAR PREVENTER 10:00 - 13:00 3.00 CEMT N CEMT SURF R/U FOR CEMENT TOP JOB -P/U 1"HYDRIL AND RIH HOLE TO 105'MD UNABLE TO CIRCULATE, POOH AND CHANGE OUT BTM JT -RIH TO 105'MD AND ESTABLISH CIRCULATION AT 1/2 BPM,100 PSI -RIH TO 130'MD AND ESTABLISH CIRCULATION AT 2 BPM,380 PSI -SLOW RATE TO 1/2 BPM,45 PSI -TAKE RETURNS TO CELLAR,CIRCULATE FRESH WATER(47 BBLS OF WATER _ PUMPED TOTAL) 13:00 - 13:30 0.50 CEMT N CEMT SURF PJSM WITH SLB,DOYON,MI SWACO, CH2MHILL,BP ON CEMENT TOP JOB. Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 12 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:OOAM !Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 13:30 - 14:30 1.00 CEMT N CEMT SURF PERFORM 9-5/8"CASING CEMENT TOP JOB /'n"iT -SWAP OVER TO SLB CEMENTERS (J -PUMP 11.0 PPG DEEPCRETE CEMENT(204 SX AT 1.88 CUFT/YIELD) c -2 BPM,500 PSI -CEMENT RETURNS AT SURFACE AFTER 55 BBLS PUMPED -PUMP UNTIL GOOD CEMENT BACK TO SURFACE(68 BBLS TOTAL) . AOGCC-LOU GRIMALDI WAIVED WITNESS k TO CEMENT TOP JOB 14:30 - 17:30 3.00 CEMT N CEMT SURF PULL 1"HYDRIL,FLUSH WITH WATER TO CLEAN, B/D AND L/D. CLEAN OUT CELLAR BOX,R/D HOSES AND SECURE IN B OP E DECK. 17:30 - 19:00 1.50 CEMT P i SURF PJSM, P/U STARTING HEAD,TBG SPOOL AND TEST. R/U 13-5/8"X 11"DOUBLE STUDDED ADAPTOR,3'SPOOL,13-5/8"X 13-5/8" DOUBLE STUDDED ADAPTOR AND 14"RISER. 19:00 - 00:00 5.00 BOPSUR P SURF CHANGE OUT ANNULAR ELEMENT -PJSM -PULL FITTINGS, RAMS AND ROTATING •PLATES FROM 13-5/8"ANNULAR CAP H REMOVE BOLTS AND SPOT NEW ELEMENT IN BOPE DECK -PULL CAP AND REMOVE OLD ELEMENT CLEAN OUT ANNULAR CAVITY AND CAP -GREASE ANNULAR CAVITY AND CAP INSTALL NEW ELEMENT AND RE-INSTALL CAP 4/29/2012 00:00 - 10:00 10.00 BOPSUR P SURF N/U BOPE EQUIPMENT AND CHANGE OUT SAVER SUB ON TOP DRIVE. CUT&INSTALL RISER n D -INSTALL STRIP-O-MATIC 6 INSTALL CHOKE&KILL LINES 1-INSTALL FLOW BOX, FLOW LINE, HOLE FILL LINE,AND DOUBLE ANNULUS VALVES -INSTALL TEST PLUG&TEST JT M/U FOSV'S TO TEST -FUNCTION TEST ANNULAR BAG Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 13 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PBV Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase ! Description of Operations (hr) (ft) 10:00 - 15:00 5.00 BOPSUR P SURF TEST BOPE PER BP/AOGCC/DDI REQUIREMENTS TO 250-PSI LO/4000-PSI HI. TESTED 2-7/8"X 5-1/2"UPPER VBR'S,2-7/8"X 5-1/2"LOWER VBR'S WITH 3-1/2"&4"TEST JT.,TESTED BLIND SHEAR RAMS 250-PSI LO/ 4000-PSI HI,2 EA.OF 4-1/2"IF FOSV'S, 1 EA. OF 3-1/2"IF DART VALVE&FOSV. TESTED CHOKE MANIFOLD VALVES 1-15, CHOKE AND q p KILL MANUAL&HCR VALVES,4"KILL LINE 'J(lnll VALVE&UPPER AND LOWER TOP DRIVE IBOP'S. TESTED MANUAL AND SUPER CHOKES TO 250-PSI LO/2000-PSI FOR 5 CHARTED MINUTES EACH TEST. TESTED ANNULAR PREVENTER WITH 3 1/2"&4"TEST JT.TO 250-PSI LO/3500-PSI HI. CHARTED ALL HI AND LO TESTS FOR 5-MINUTES EACH. ! I I I PERFORMED KOOMEY DRAWDOWN TEST: -ACCUMULATOR PSI=3000, MANIFOLD PSI= -500 ACCUMULATOR PSI AFTER FUNCTIONING BOPE= 1750-PSI -200-PSI RECOVERY TIME WITH 1 ELECTRIC PUMP=26-SECONDS -RECOVERY TO FULL SYSTEM PRESSURE WITH 2 ELECTRIC PUMPS AND 2 AIR PUMPS =136 SECONDS. -6 NITROGEN BOTTLES AVERAGE PRESSURE=2217-PSI BOP CLOSING TIMES: -ANNULAR PREVENTER=23-SECONDS -UPPER PIPE RAMS=21-SECONDS -LOWER PIPE RAMS=21-SECONDS -BLIND/SHEAR RAMS=25-SECONDS -HCR KILL VALVE=5-SECONDS -HCR CHOKE=5-SECONDS. REFERENCED DDI SOP#432 FOR ALL TESTING. GAVE AOGCC 24-HRS. NOTICE OF BOPE TEST AT 17:00-HRS.ON 4/26/12 BOB NOBLE-AOGCC WAIVED WITNESS BOPE TESTING. 15:00 - 15:30 0.50 BOPSUR P SURF !RIG DOWN BOPE TEST EQUIPMENT -PULL TEST PLUG 15:30 - 16:00 0.50 BOPSUR P SURF STRAP RKB&BOPE STACK -INSTALL WEAR BUSHING / I�` 16:00 - 17:00 1.00 CASING P SURF PERFORM 9 5/8"SURFACE CASING TEST GUS J -TEST 250-PSI LO FOR 5 MIN CHARTED,TEST PASSED -TEST 3500-PSI HI FOR 30 MIN CHARTED, TEST PASSED 30° WTL-(ALAN MADSEN FILLING IN FOR MIKE SCHULTZ)APPROVAL TO PROCEED. 17:00 - 18:00 1.00 CASING P SURF MAKE UP FOSV TO SHEAR JT.&LAY DOWN -B/D CHOKE&KILL LINE CLEAN&CLEAR RIG FLOOR 18:00 - 19:00 1.00 CASING P SURF PREPARE 8-3/4"PRODUCTION DRILLING BHA #4 COMPONENTS IN PIPE SHED -P/U TOOLS FROM SLIDE Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 14 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:00 - 21:30 2.50 CASING P SURF MAKE UP 8-3/4"PRODUCTION DRILLING BHA TO 649'MD -PDC BIT,1.5 MOTOR, PWD, MWD,ADN, LOAD SOURCES, DRILL COLLARS, HYDRAULIC JARS&HWDP 21:30 - 00:00 2.50 CASING P SURF RUN IN HOLE WITH 8-3/4"PRODUCTION 'DRILLING BHA FROM 649'MD TO 1,600'MD PERFORM SHALLOW PULSE TEST AT 1089' MD, GOOD DETECTION 404 GPM,1010 PSI 4/30/2012 00:00 - 01:00 1.00 CASING P SURF RIH WITH 8-3/4"PRODUCTION DRILLING BHA #4 FROM 1600'MD TO 3175'MD -MONITOR WELL ON TRIP TANK 01:00 - 02:00 1.00 CASING P I SURF WASH FROM 3175'MD TO 3215'MD AND TAG CEMENT -550 GPM,2600 PSI SPR'S: 3180'MD(2743'TVD)-TIME=1:30, MW=9.2 PPG #1 MP-20/30 SPM=360/440 PSI #2 MP-20/30 SPM=340/440 PSI 02:00 - 03:00 1.00 CASING P SURF DRILL SHOE TRACK FROM 3215'MD TO 3318' MD, 10'ABOVE 9-5/8"SHOE -550 GPM,2640 PSI -40 RPM,6K TQ -5-10K WOB 03:00 - 04:00 1.00 CASING P SURF DISPLACE WELL WHILE RECIPROCATING 'AND ROTATING -PUMP 34 BBL WATER SPACER -PUMP 33 BBLS 300+VIS PILL -DISPLACE WELL TO 9.2 PPG LSND DRILLING FLUID -400 GPM,975 PSI -40 RPM,5K TQ SPR'S: 3318'MD(2780'TVD)-TIME=4:00, MW=9.2 PPG #1 MP-20/30 SPM=320/340 PSI #2 MP-20/30 SPM=300/340 PSI 04:00 - 04:30 0.50 CASING P SURF DRILL THROUGH 9-5/8"CASING SHOE AND 20' MD OF NEW HOLE FROM 3318'MD TO 3355' MD -550 GPM,1540 PSI -40 RPM,6K TQ -5-10K WOB 04:30 - 05:00 0.50 CASING P SURF CIRC B/U AND MONITOR WELL FOR 10 MIN- STATIC -MW 9.2 PPG IN AND OUT -B/D TOP DRIVE 05:00 - 06:00 1.00 CASING P SURF PERFORM LOT AT 3355'MD,2824'ND -MW 9.2 PPG -SUCCESSFULL LOT TO 12.5 PPG EMW -ODE APPROVAL TO PROCEED Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 15 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay - Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 12:00 6.00 DRILL P PROD1 DRILL 8-3/4"PRODUCTION HOLE FROM 3355' MD TO 4065'MD(3289'TVD) '-575 GPM,1900 PSI ON/1790 PSI OFF -80 RPM,TQ=5-6K ON/4K OFF -WOB=3K MW=9.2PPGIN/9.2PPGOUT -ECD= 10.05 PPG(CALC ECD=9.91 PPG) P/U= 116K, S/O=92K, ROT= 103K AST=1.30 HRS,ART=1.51,ADT=2.81 HRS I TOTAL BIT HRS=2.81,TOTAL JAR HRS= 1115.4 'SPR'S: 4064'MD(3289'TVD)-TIME= 11:50, MW=9.2 PPG #1 MP-20/30 SPM=260/320 PSI 1 #2 MP-20/30 SPM=260/320 PSI 12:00 - 00:00 12.00 DRILL P ' PROD1 DRILL 8-3/4"PRODUCTION HOLE FROM 4065' MD TO 5586'MD(4326'TVD) ,-575 GPM,2650 PSI ON/2360 PSI OFF 1-80 RPM,TQ=7-8K ON/6-7K OFF WOB=2-10K MW=9.2PPGIN/9.2PPGOUT -ECD= 10.29 PPG(CALC ECD=9.91 PPG) -P/U= 114K, S/O= 102K, ROT= 117K I AST= 1.15 HRS,ART=4.38,ADT=5.63 HRS 1TOTAL BIT HRS=5.63,TOTAL JAR HRS= 1121.1 ;TOTAL LOSSES FOR LAST 24 HRS=0 BBLS SPR'S: 4540'MD(3615'TVD)-TIME= 15:20, MW=9.2PPG #1 MP-20/30 SPM=320/380 PSI #2 MP-20/30 SPM=320/380 PSI I � SPR'S: 5010'MD(3946'TVD)-TIME=19:00, MW=9.2PPG #1 MP-20/30 SPM=340/400 PSI #2 MP-20/30 SPM=340/400 PSI SPR'S: 5492'MD(4263'TVD)-TIME=23:150, MW=9.2PPG #1 MP-20/30 SPM=350/420 PSI #2 MP-20/30 SPM=350/420 PSI Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 16 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date:5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/1/2012 00:00 - 07:30 7.50 DRILL P PROD1 DRILL 8-3/4"PRODUCTION HOLE FROM 5586' MD TO 6390'MD(4893'TVD) 575 GPM,3000 PSI ON/2780 PSI OFF 80 RPM,TQ=9K ON/6-7K OFF -WOB=8K -MW=9.2 PPG IN/9.2 PPG OUT -ECD=10.52 PPG(CALC ECD=9.91 PPG) -P/U=166K,S/O= 107K, ROT= 124K AST=0.79 HRS,ART=3.29,ADT=4.08 HRS TOTAL BIT HRS= 12.52,TOTAL JAR HRS= 125.1 PRODUCTION HOLE TD CALLED BY GEOLOGY AT 6390'MD(4893'TVD) SPR'S: 6062'MD(4660'TVD)-TIME=4:00, MW=9.35 PPG #1 MP-20/30 SPM=340/420 PSI #2 MP-20/30 SPM=340/420 PSI SPR'S: 6390'MD(4893'TVD)-TIME=9:15, MW=9.35 PPG #1 MP-20/30 SPM=340/420 PSI #2 MP-20/30 SPM=340/400 PSI 07:30 - 09:00 ( 1.50 DRILL P PROD1 'CIRCULATE,ROTATE AND RECIPROCATE 3X B/U -575 GPM,2800 PSI -100 RPM,5K TQ -FROM 6390'MD TO 6345'MD 09:00 - 14:30 5.50 DRILL P PROD1 BACKREAM/MAD PASS FROM 6390'MD TO 15320'MD -575 GPM,2450 PSI -100 RPM,7-8K TQ -360 FT/HR PULLING SPEED -ECD'S CLIMBING FROM 10.21 PPG EMW TO 111.0 PPG EMW 14:30 - 15:30 1.00 DRILL P PROD1 CIRCULATE, ROTATE AND RECIPROCATE TO LOWER ECD'S -PUMP 30 BBL HI-VIS SWEEP,30% INCREASE IN RETURNS HOCKEY PUCK SIZE CLAY BALLS ACROSS ;SHAKERS -ECD=10.2 PPG EMW(CALC ECD=9.98 PPG) -MW=9.4 PPG 15:30 - 00:00 8.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 5320'MD TO 3369'MD -575 GPM,2450 PSI -100 RPM,6-7K TQ -600 FT/HR PULLING SPEED ECD'S CLIMBING TO 11.0 PPG EMW,BACK RATES OFF PERIODICALLY TO MANAGE ECD'S -400 GPM,1575 PSI -50 RPM,5-6K TQ -400 FT/HR PULLING SPEED PULLING BHA INTO 9-5/8"CSG SHOE ECD= 10.98 PPG EMW(CALC ECD=9.91 I- PPG) TOTAL LOSSES FOR LAST 24 HRS=0 BBLS Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 17 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay • Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:OOAM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/2/2012 00:00 - 00:30 0.50 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 3369'MD to 3309'MD -550 GPM,2050 PSI -100 RPM,4K TQ -600 FT/HR PULLING SPEED • -ECD=10.98 PPG EMW(CALC ECD=9.91 PPG) .00:30 - 01:30 1.00 DRILL P PROD1 CIRCULATE ROTATE AND RECIPROCATE 4X B/U IN 9-5/8"CASING -575 GPM,2100 PSI -100 RPM,4K TQ -WORK PIPE FROM 3309'MD TO 3210'MD 01:30 - 02:00 1 0.50 DRILL P PROD1 MONITOR WELL FOR 10 MIN-STATIC -MW 9.4 PPG IN AND OUT B/D TOP DRIVE 02:00 - 03:30 1.50 DRILL P PROD1 RIH WITH 8-3/4"PRODUCTION BHA FROM 3309'MD TO 6390'MD -MONITOR WELL ON TRIP TANK 03:30 - 06:00 2.50 DRILL P PROD1 CIRCULATE,ROTATE AND RECIPROCATE 4X B/U -575 GPM, ICP=2830 PSI. FCP=2630 PSI -100 RPM,9K TQ -WORK PIPE FROM 6390' MD TO 6295' MD •-PUMP 30 BBL HI-VIS SWEEP(300 VIS AND 9.4 PPG). SLIGHT INCREASE IN CLAY BALLS ON RETURN -150 BBL DILUTION OF NEW 9.3 PPG LSND MUD AT BOTTOMS UP NOTICED AN INCREASE IN FLOW OUT,SHUT PUMPS DOWN AND MONITORED WELL.OBSERVED AIR BREAKING OUT OF MUD AT SURFACE, BUT WELL WAS NOT FLOWING. CONTINUED CIRCULATING AFTER 10 MIN OF MONITORING WELL WITH NO FLOW. SPR'S: 6390'MD(4893'TVD)-TIME=5:45, MW=9.35 PPG #1 MP-20/30 SPM=300/390 PSI #2 MP-20/30 SPM=300/390 PSI 06:00 - 08:30 2.50 DRILL P PROD1 POOH ON ELEVATORS FROM 6390'MD TO 3300'MD -MONITOR WELL ON TRIP TANK MONITOR WELL AT CASING SHOE FOR 10 MIN-STATIC -MW 9.4 PPG IN AND OUT 08:30 - 10:30 2.00 DRILL P PROD1 POOH ON ELEVATORS FROM 3300'MD TO 230'MD -MONITOR WELL ON TRIP TANK MONITOR WELL AT BHA FOR 10 MIN-STATIC MW 9.4 PPG IN AND OUT Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 18 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 12:00 1.50 DRILL P PROD1 L/D 8-3/4"PRODUCTION BHA#4 FROM 230' MD TO SURFACE -PJSM WITH SLB MWD AND DD ON REMOVING RA SOURCE -REMOVE NUCLEAR SOURCES AT 100'MD MONITOR WELL ON TRIP TANK BIT GRADE:2-2-CT-A-X-118-BT-TD 12:00 - 14:00 2.00 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR -REMOVE BTM HOLE TOOLS,SUBS,AND BIT BREAKER FROM FLOOR -MOVE COLLARS,JARS, AND HWDP -LOAD LOGGING TOOLS IN PIPE SHED -PJSM WITH SLB WIRELINE CREW ON RIG UP WIRELINE 14:00 - 14:30 0.50 DRILL P PROD1 P/U STACK WASHER AND FLUSH STACK -357 GPM,55 PSI -60 RPM -WASH ALL RAMS 14:30 - 15:00 0.50 BOPSUR P PROD1 FUNCTION TEST ALL BOP RAMS -WASH STACK AFTER FUNCTIONING RAMS -BLOW DOWN SURFACE EQUIPMENT 15:00 - 18:00 3.00 EVAL P PROD1 P/U LOGGING TOOLS FROM SLIDE. M/U MDT LOGGING BHA AND RUN IN HOLE TO 144'MD -TEST DOWN HOLE WET CONNECT(GOOD TEST) 18:00 - 18:30 0.50 EVAL P PROD1 C/O SLIP INSERTS AND GUIDES FROM#3'S TO 4"DR 18:30 - 21:00 2.50 EVAL P PROD1 RIH ON ELEVATORS WITH 4"DP FROM 144' MD TO 3279'MD -MONITOR WELL ON TRIP TANK -P/U=98K,S/O=83K -CIRCULATE 20 BBLS EVERY 4 STANDS AT 298 GPM 21:00 - 22:00 1.00 EVAL P ' PROD1 CIRCULATE AT 9-5/8"CASING SHOE -298 GPM,410 PSI -P/U=98K,S/O=83K -R/U E-LINE SHEAVES 22:00 - 00:00 2.00 EVAL P PROD1 RIH ON ELEVATORS WITH 4"DP FROM 3279' MD TO 5075'MD -MONITOR WELL ON TRIP TANK -P/U= 120K, S/O=90K -CIRCULATE 20 BBLS EVERY 4 STANDS -298 GPM,539 PSI TOTAL LOSSES FOR LAST 24 HRS=0 BBLS SPR'S: 4700'MD(3750'TVD)-TIME=23:35, MW=9.4 PPG #1 MP-20/30 SPM=80/100 PSI #2 MP-20/30 SPM=80/100 PSI Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 19 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) , (ft) 5/3/2012 00:00 - 02:00 2.00 EVAL P PROD1 M/U SIDE DOOR ENTRY SUB WITH E-LINE. -INSERT E-LINE WITH PUMP DOWN WET CONNECT INTO SIDE DOOR ENTRY SUB 1-RUN IN HOLE WITH E-LINE TO 500'MD ABOVE DOWN HOLE WET CONNECT -PUMP AT 435 GPM,1130 PSI -RUN IN HOLE WITH E-LINE TO CONNECT TO DOWN HOLE WET CONNECT(GOOD CONNECTION) -INSTALL CLAMP TO E-LINE AND SIDE DOOR ENTRY SUB -SLB E-LINE PULL TEST SIDE DOOR ENTRY SUB CLAMP TO 2400 LBS(GOOD TEST) 02:00 - 03:30 1.50 EVAL P PROD1 RIH WITH MDT LOGGING ASSEMBLY -MONITOR WELL ON TRIP TANK -FILLING PIPE EVERY JOINT 03:30 - 11:00 7.50 EVAL P PROD1 OBTAIN FORMATION PRESSURE SAMPLES WITH MDT LOGGING ASSEMBLY -LOGGED ON DEPTH -5756'ELM IN OA -5776'ELM IN OA -5791'ELM IN OA -5839'ELM IN OBA -5846'ELM IN OBA 5869'ELM IN OBA -5897'ELM IN OBB -5980'ELM IN OBC -5985'ELM IN OBC -6050'ELM IN OBD -6070'ELM IN OBD -6093'ELM IN OBD 11:00 - 00:00 13.00 EVAL P PROD1 OBTAIN FORMATION FLUID SAMPLES WITH MDT LOGGING ASSEMBLY 1-LOGGED ON DEPTH -5899'ELM IN OBB -5756'ELM IN OA -6070'ELM IN OBD 5/4/2012 00:00 - 03:30 3.50 EVAL P PROD1 OBTAIN FORMATION FLUID SAMPLES WITH 1MDT LOGGING ASSEMBLY -LOGGED ON DEPTH -5839'ELM IN OBA -5980'ELM IN OBC 03:30 - 04:30 1.00 EVAL P ' PROD1 POOH ON ELEVATORS WITH MDT LOGGING ASSEMBLY -MONITOR WELL ON TRIP TANK 04:30 - 05:30 1.00 EVAL P PROD1 R/D SLB E-LINE AND SIDE DOOR ENTRY SUB. 105:30 - 07:00 1.50 EVAL P PROD1 CIRCULATE B/U WHILE RECIPROCATING FROM 5078'MD TO 4989'MD 400 GPM,640 PSI Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 20 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date:3/1/2012 End Date: 5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 09:30 2.50 EVAL P PROD1 MONITOR WELL FOR 10 MIN-STATIC -MW 9.4 PPG IN AND OUT POOH ON ELEVATORS FROM 5895'MD TO 3330'MD -MONITOR WELL ON TRIP TANK MONITOR WELL FOR 10 MIN-STATIC -MW 9.4 PPG IN AND OUT POOH ON ELEVATORS FROM 3330'MD TO 150'MD -MONITOR WELL ON TRIP TANK 09:30 - 12:00 2.50 EVAL P PROD1 MONITOR WELL FOR 10 MIN-STATIC MW 9.4 PPG IN AND OUT UD MDT LOGGING ASSEMBLY 12:00 - 12:30 0.50 EVAL P j PROD1 CLEAN AND CLEAR RIG FLOOR. 12:30 - 13:30 1.00 EVAL P PROD1 ADJUST#2 CHARGE PUMP IMPELLER AND FIX PIPE SHED DRIVE MOTOR. 13:30 - 15:00 1.50 EVAL P PROD1 TROUBLESHOOT OSCILLATOR PROGRAM ON AMPHION SYSTEM WITH DOYON ELECTRICIAN AND NOV TECH. 15:00 - 15:30 0.50 EVAL P PROD1 M/U CLEANOUT BHA#5 -PDC BIT -NEAR BIT STABILIZER -3X FLEX COLLAR -HYDRAULIC JARS 15:30 - 16:00 0.50 EVAL P PROD1 ,RIH WITH CLEANOUT BHA TO 175'MD AND C/O PS-21 SLIP INSERTS TO 4"DP. 16:00 - 17:30 1.50 EVAL P PROD1 RIH WITH CLEANOUT BHA FROM 175'MD TO 3311'MD -FILL PIPE AT 1981'MD AND 3311'MD 17:30 - 21:30 4.00 EVAL P PROD1 RIH WITH CLEANOUT BHA FROM 3311'MD TO 6390'MD -BREAK CIRCULATION EVERY 10 STANDS -211 GPM,350 PSI 21:30 - 00:00 2.50 EVAL P PROD1 CIRCULATE, RECIPROCATE,AND ROTATE 3X B/U -FROM 6351'MD TO 6390'MD -600 GPM,2480 PSI -120 RPM,7-8K TQ -P/U=155K, S/0=94K, ROT= 112K -PUMP 30 BBL HI-VIS SWEEP-10% INCREASE IN CUTTING ON RETURN -PUMP 290 BBLS OF NEW 9.2 PPG LSND MUD INTO SYSTEM 5/5/2012 00:00 - 00:30 0.50 EVAL P PROD1 CIRCULATE, RECIPROCATE,AND ROTATE B/U -FROM 6351'MD TO 6390'MD -600 GPM,2480 PSI -120 RPM,7-8K TQ -P/U= 155K, S/0=94K, ROT=112K SPR'S: 6390'MD(4888'TVD)-TIME=01:00, MW=9.35 PPG #1 MP-20/30 SPM=220/280 PSI #2 MP-20/30 SPM=220/280 PSI Printed 5/29/2012 10:28:52AM North America -ALASKA- BP Page 21 of 21 Operation Summary Report Common Well Name:V-229 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 3/1/2012 End Date:5/5/2012 X3-0110G-C: (5,892,314.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 03:00 2.50 EVAL P 1 PROD1 MONITOR WELL FOR 10 MIN-STATIC -MW 9.3 PPG IN AND OUT POOH WITH CLEANOUT BHA#5 FROM 6390' MD TO 3330'MD -MONITOR WELL ON TRIP TANK 03:00 - 03:30 0.50 EVAL P PROD1 CIRCULATE, RECIPROCATE,AND ROTATE B/U -600 GPM,2480 PSI -120 RPM,7-8K TQ I � MONITOR WELL FOR 10 MIN-STATIC -MW 9.3 PPG IN AND OUT 03:30 - 05:00 1.50 EVAL P PROD1 POOH WITH CLEANOUT BHA#5 FROM 3330' MD TO 560'MD -MONITOR WELL ON TRIP TANK 05:00 - 06:00 1.00 EVAL P PROD1 L/D HWDP AND CLEANOUT BHA#5 FROM 560' MD TO SURFACE -MONITOR WELL ON TRIP TANK 06:00 - 07:00 1.00 EVAL P PROD1 CLEAR AND CLEAN RIG FLOOR. **END HOLE SECTION** Printed 5/29/2012 10:28:51AM North America-ALASKA- BP Page 1 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date:3/27/2012 End Date: 5/11/2012 X3-0110G-C: (3,289,289.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/5/2012 07:00 - 08:30 1.50 BOPSUR P RUNPRD **START"CON"EVENT.** CHANGE UPPER PIPE RAMS FROM 2-7/8"X 5-1/2"VBR'S TO 7" FIXED RAMS.. CHANGED SAVER SUB FROM 4"XT-39 TO 4-1/2"IF. 08:30 - 09:30 1.00 BOPSUR P RUNPRD PULLED WEAR BUSHING. SET BOP TEST PLUG AND RIGGED UP 7"BOPE TEST EQUIPMENT. 09:30 - 10:00 0.50 BOPSUR P RUNPRD PRESSURE TESTED 7"PIPE RAMS TO 250-PSI LO/3500-PSI HI FOR 5/5 CHARTED MINUTES. 10:00 - 11:00 1.00 BOPSUR P RUNPRD RIG DOWN 7"BOPE TEST EQUIPMENT. RIG UP 7"VOLANT CASING RUNNING TOOL WITH PUMP-IN SUB, BAIL EXTENSION AND 7"SIDE DOOR ELEVATORS. VERIFIED SIDE DOOR ELEVATOR BORE IS CORRECT FOR 7" CASING. 11:00 - 12:00 1.00 CASING P RUNPRD MU 7"SHOE TRACK AND RIH TO 130'MD. BAKER LOK'D ALL CONNECTIONS BELOW FLOAT COLLAR. CHECKED FLOATS(GOOD). TORQUED ALL CONNECTIONS TO 10,000 FT-LBS.TORQUE. USED JET LUBE SEAL GUARD THREAD COMPOUND. 12:00 - 19:00 7.00 CASING P RUNPRD RIH WITH 7"26#, L-80 TCII CASING FROM 130' MD TO 2607'MD PER CASING RUNNING ORDER WITH VOLANT CASING RUNNING TOOL. TORQUED ALL CONNECTIONS TO 10,000 FT-LBS. USED JET LUBE SEAL GUARD THREAD COMPOUND. FILLED EVERY JOINT ON THE FLY AND BROKE CIRCULATION EVERY 5 JTS.@ 3.0-BPM AND 115-PSI. 19:00 - 20:00 1.00 CASING N RUNPRD PIPE SLIPPED DOWNWARD—12"IN PS-21 SLIPS DUE TO FAULTY PIPE TO SLIP SEGMENTS ALIGNMENT CAUSED BY INCORRECT SIZE PIPE GUIDE. 7-5/8"PIPE GUIDE VS.7"PIPE GUIDE. JOINT#64(41.68') WAS DAMAGED AND REPLACED WITH EXTRA JOINT(40.57')FROM OUTSIDE. CHANGED FROM 7"SLIP INSERTS TO 7"HAND SLIPS. 20:00 - 21:00 1.00 CASING P RUNPRD CONTINUED RIH WITH 7"7"26#, L-80 TCII CASING FROM 2607'MD TO 3280'MD. MONITORING PIPE DISPLACEMENT VIA PITS 1,2,AND 3. FILLED EVERY JOINT ON THE FLY AND BROKE CIRCULATION EVERY 5 JTS. @ 3.0-BPM AND 115-PSI. 21:00 - 21:30 0.50 CASING P RUNPRD RECIPRCOCATE AND CIRCULATE BOTTOMS UP AT CASING SHOE AT 3304'MD. BROOMSTICK PLOT FRICTION FACTOR 0.0 AT CASING SHOE. -211-GPM @ 230-PSI -PUW= 109K,SOW= 105K -PUMPED 1105 STROKES 21:30 - 22:00 0.50 CASING P RUNPRD CONTINUED RIH WITH 7"7"26#, L-80 TCII CASING FROM 3304'MD TO 3900'MD. MONITORING PIPE DISPLACEMENT VIA PITS 1,2,AND 3. FILLED EVERY JOINT ON THE FLY AND BROKE CIRCULATION EVERY 5 JTS. 3.0-BPM AND 185-PSI. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 2 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date:3/27/2012 End Date:5/11/2012 X3-0110G-C: (3,289,289.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 22:30 0.50 CASING P RUNPRD RECIPROCATED AND CIRCULATED BOTTOMS UP AT 3922'MD. BROOMSTICK PLOT FRICTION FACTOR INCREASED FROM 0.0 AT CASING SHOE AT 3304'MD TO 0.35 AT 3922' MD. -21-GPM @ 230-PSI -PUW=126K,SOW=105K PUMPED 1105 STROKES 22:30 - 00:00 1.50 CASING P RUNPRD CONTINUED RIH WITH 7"7"26#, L-80 TCII CASING FROM 3922'MD TO 4080'MD. MONITORING PIPE DISPLACEMENT VIA PITS 1,2,AND 3. FILLED EVERY JOINT ON THE FLY AND BROKE CIRCULATION EVERY 5 JTS. @ 3.0-BPM AND 185-PSI. 5/6/2012 00:00 - 05:00 5.00 CASING P RUNPRD CONTINUED RIH WITH 7"7"26#, L-80 TCII CASING FROM 4080'MD TO 6340'MD. MONITORING PIPE DISPLACEMENT VIA PITS 1,2,AND 3. FILLED EVERY JOINT ON THE FLY AND BROKE CIRCULATION EVERY 5 JTS. @ 3.0-BPM AND 185-PSI. RE-ORIENTED ROTARY TABLE. SWAPPED FROM HAND SLIPS TO 7"INSERTS IN PS-21 SLIPS. BROOMSTICK PLOT FRICTION FACTOR ST 5365'MD=0.35. 05:00 - 09:30 4.50 CASING P RUNPRD CIRCULATE WHILE RECIPROCATING PIPE FROM 6350'MD.TO 6320'MD. -STAGED PUMPS UP TO 252-GPM @ 330-PSI. -TOTAL STROKES PUMPED= 11200 PICK UP AND MAKE UP LANDING JOINT WITH FMC FLUTED HANGER. SIMOPS-PJSM WITH DDI,SLB CEMENTERS, M-I MUD ENGINEER, BP WSL,GBR CASING, CH2MHILL PERSONNEL. PRESSURE TESTED CEMENTING LINES TO 250-PSI LO/4000-PSI HI FOR 5/5 CHARTED MINUTES. 09:30 - 10:00 0.50 CASING P RUNPRD FLUSH RIG MUD LINES WITH 9.0-PPG BRINE WHILE BATCHING CEMENT. Printed 5/29/2012 10:37:33AM North.America -ALASKA- BP, Page 3 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date: 3/27/2012 End Date: 5/11/2012 X3-0110G-C: (3,289,289.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 11:30 1.50 CASING P RUNPRD CEMENT 7"PRODUCTION CASING. CEMENT JOB: C -RECIPROCATE 10'STROKES -PUMP 35 BBLS 10.2 PPG MUD PUSH AT 4.5 BPM,450 PSI -DROP BOTTOM PLUG. -PUMP 19-BBLS. (75 SX) 11.0-PPG LITECRETE LEAD CEMENT,YIELD 1.92 CUFT/SK.@ 5.0 BPM @ 630-PSI. 1(3bbl -PUMP 57.51 BBLS(327 SX) 15.8 PPG CLASS G TAIL CEMENT.YIELD 1.17 CUFT/SK.@ 4.0 to 5.3 BPM @ 560 PSI. -DROP TOP PLUG. SWAP TO RIG AND DISPLACE WITH 9.0 PPG BRINE: -DISPLACEMENT RATE 6 BPM,833 PSI AT 212 BBLS AWAY -BUMP PLUG AT 234 BBLS AT 1469 PSI -CONTINUE TO PUMP AT 2 BPM TO PRESSURE UP TO 2535 PSI -STOPPED PUMPING AND HELD PRESSURE FOR 5 MIN -BLEED PRESSURE OFF AND CHECK FLOATS(FLOATS GOOD) -RECIPROCATED PIPE WITH 10'STROKES FROM 6385'MD TO 6375'MD THROUGHOUT JOB UNTIL PLUG BUMP. LANDED CASING ON FLUTED HANGER. -7"PRODUCTION CASING SHOE AT 6,388.33' MD CEMENT IN PLACE AT 11:26-HRS: -76.51-BBLS OF CEMENT IN PLACE -FULL RETURNS DURING ENTIRE CEMENT JOB -GOOD LIFT PRESSURE THROUGHOUT JOB, FINAL CEMENT LIFT PRESSURE 1021-PSI -ESTIMATED TOP OF CEMENT AT 5130'MD. TOP OF UG-MA SAND=5170'MD. TAIL CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH IN 9 HRS 40 MIN 11:30 - 12:00 0.50 CASING P RUNPRD LAY DOWN LANDING JOINT. PICKED UP 7" TEST JOINT AND MADE UP PACK-OFF RUNNING TOOL. DRAINED BOP STACK. 12:00 - 14:00 2.00 CASING P RUNPRD SET CASING PACK-OFF PER FMC REP. FMC REP. RAN IN LOCKDOWN SCREWS. THAW LINES IN CELLAR. PRESSURE TESTED PACK-OFF TO 250-PSI LO/5000-PSI HI FOR 15/30 CHARTED MINUTES. 14:00 - 14:30 0.50 CASING P RUNPRD LAYED DOWN 7"TEST JOINT AND PACK-OFF RUNNING TOOL. RIGGED DOWN VOLANT CRT, BAIL EXTENSIONS AND 7"SIDE DOOR ELEVATORS. 14:30 - 15:00 0.50 CASING P RUNPRD CHANGED FROM 4-1/2"IF SAVER SUB TO 4" XT-39 SAVER SUB. RIGGED UP LINES TO FREEZE PROTECT 0/A. 15:00 - 16:30 1.50 CASING N RUNPRD PICKED UP 7"CASING TEST JOINT. INSTALLED 7"PS-21 SLIP INSERTS AND INVESTIGATED FOR PROPER CLOSURE ON 7"JOINT. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 4 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/27/2012 End Date: 5/11/2012 X3-0110G-C:(3,289,289.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 17:30 1.00 BOPSUR P RUNPRD CHANGED FROM 7"FIXED UPPER PIPE RAMS TO 2-7/8"X 5-1/2"VBR'S. CLEANED CEMENT VALVES IN MUD MANIFOLD. INSTALLED HYDRAULIC TANK AND ACCUMULATOR IN TOP DRIVE. 17:30 - 18:00 0.50 CASING P RUNPRD PUMPED 8.0-BBLS.OF 9.4-PPG LSND MUD INTO 0/A TO BREAK DOWN FORMATION FOR FREEZE PROTECT. -ICP=900-PSI -FCP=850-PSI 18:00 - 18:30 0.50 CASING P RUNPRD CHANGED OUT TOP DRIVE SWIVEL PACKING ON WASH PIPE. 18:30 - 19:30 1.00 BOPSUR P RUNPRD INSTALLED BOP TEST PLUG WITH 4"TEST JOINT. PRESSURE TESTED UPPER PIPE RAMS TO 250-PSI LO/4000-PSI FOR 5/5 CHARTED MINUTES. LOADED PERFORATING GUNS IN PIPE SHED. PUMPED 2.0-BBLS. MUD INTO 0/A. 19:30 - 20:30 1.00 BOPSUR P RUNPRD LAYED DOWN 4"TEST JOINT AND PICKED UP 3-1/2"TEST JOINT. PRESSURE TESTED UPPER PIPE RAMS TO 250-PSI LO/4000-PSI FOR 5/5 CHARTED MINUTES. STAGED SLB PERF GUN TOOLS TO RIG FLOOR. 20:30 - 21:30 1.00 BOPSUR P RUNPRD LAYED DOWN BOP TEST PLUG AND 4"TEST JOINT. INSTALLED 6-11/16"I.D.WEAR RING. INSTALLED STRIP-O-MATIC. PUMPED 2.0-BBLS.MUD INTO 0/A. 21:30 - 22:30 1.00 CASING P RUNPRD CLOSED BLIND/SHEAR RAMS. PRESSURE TESTED 7"CASING TO 250-PSI LO/4000-PSI HI FOR 5/30 CHARTED MINUTES PER DDI ��p SOP-265 AND CRT-AK-10-45 PASS/FAIL CRITERIA. E-MAILED TEST CHART AND TEST CRITERIA SPREADSHEET TO DRILLING SUPERINTENDENT STANDING IN FOR WTL- MIKE SCHULTZ FOR REVIEW AND AUTHORIZATION TO PROCEED. VERBAL AUTHORIZATION RECIEVED TO PROCEED WITH OPERATIONS. CASING PASSED PRESSURE TEST. VERIFIED NO TRAPPED PRESSURE IN CASING. OPENED BLIND/SHEAR RAMS. PUMPED 2-BBLS.MUD INTO 0/A. 22:30 - 23:00 0.50 PERFOB P OTHCMP PJSM-REVIEWED DDI SOP,SLB PROCEDURE AND ADW RP"DRILL PIPE CONVEYED PERFORATING"FOR HANDLING AND RUNNING DRILL PIPE CONVEYED PERFORATING GUNS WITH SLB CREW,DDI RIG CREW, DDI TP AND BP WSL. REVIEWED WELL CONTROL ISSUES AND CONTINGENCIES WITH NON-SHEARABLE TUBULARS ACROSS BOP STACK. 23:00 - 00:00 1.00 PERFOB P OTHCMP PICK UP AND MAKE UP 4.5"SLB DRILL PIPE CONVEYED PERFORATING GUNS FROM PIPE SHED. 5/7/2012 00:00 - 01:30 1.50 PERFOB P OTHCMP PICK UP AND RIH WITH 4-1/2"SLB PERFORATING GUNS FROM PIPE SHED. 01:30 - 02:00 0.50 PERFOB P OTHCMP RIH WITH 4-1/2"SLB PERFORATING GUNS ON 4"DP FROM DERRICK FROM 433'MD TO 917' MD. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 5 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date: 3/27/2012 End Date:5/11/2012 X3-0110G-C: (3,289,289.00) Project:Prudhoe Bay Site: PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 02:30 0.50 PERFOB P OTHCMP SHALLOW TEST LWD. -260 GPM @ 480-PSI -BLEW DOWN TOP DRIVE 02:30 - 06:00 3.50 PERFOB P OTHCMP RIH WITH SLB PERF GUNS FROM 917'MD TO 6304'MD. MONITOR DISPLACEMENT VIA TRIP TANK. TAGGED ON DEPTH AT 6304'MD. 06:00 - 06:30 0.50 PERFOB P OTHCMP CIRCULATE AT 260-GPM AT 880-PSI. 06:30 - 07:00 0.50 PERFOB P OTHCMP POH FROM 6304'MD TO 6237 MD. CORRELATE DEPTH WITH SLB LWD. 07:00 - 09:00 2.00 PERFOB P OTHCMP LOG WHILE POH FROM 6327'MD TO 6100'MD. CORRELATE DEPTH WITH MARKER JOINT. 09:00 - 09:30 0.50 PERFOB P OTHCMP CLOSED ANNULAR PREVENTER. PERFORMED TCP EFIRE RATIONALIZED COMMAND SEQUENCE FOR PERFORATING GUNS PER SLB REPRESENTATIVE. GOOD INDICATION OF GUN DETONATION AT 09:15-HRS. CHECKED FOR TRAPPED PRESSURE AND OPENED ANNULAR PREVENTER. FLOW CHECKED WELL. LOST 7.0-BBLS.TO HOLE ON DETONATING GUNS. PERFORATION INTERVALS: 5740'-5794'MD 5832'-5872'MD 5892'-5918'MD 5976'-5990'MD 6045'-6100'MD 09:30 - 10:00 0.50 PERFOB P OTHCMP POH FROM 6100'MD TO 5665'MD. MONITOR DISPLACEMENT VIA TRIP TANK. 10:00 - 11:00 1.00 PERFOB P OTHCMP CIRCULATE BOTTOMS UP. -260-GPM @ 800-PSI. -MONITOR WELL.STATIC-NO LOSSES. -MW 9.0-PPG IN/OUT 11:00 - 11:30 0.50 PERFOB P OTHCMP CIRCULATE 150-BBLS CLEAN BRINE INTO WELL. -260-GPM @ 800-PSI. -NO LOSSES TO HOLE. -BLEW DOWN TOP DRIVE 11:30 - 12:00 0.50 PERFOB P OTHCMP POH LAYING DOWN 4"DP DOUBLES TO PIPE SHED FROM 5665'MD TO 5210'MD. FREEZE PROTECTED 7'X 9-5/8"0/A: -STAGED PUMPS TO 3.0-BPM @ 965-PSI. -PUMPED 100-BBLS.OF 9.4-PPG LSND MUD FOLLOWED BY 61-BBLS.OF 13.5-PPG LSND MUD. 12:00 - 16:30 4.50 PERFOB P OTHCMP POH LAYING DOWN 4"DP DOUBLES TO PIPE SHED FROM 5210'MD TO 528'MD. FREEZE PROTECTED 7'X 9-5/8"0/A: -STAGED INJECTION PUMP TO 1.25-BPM @ 920-PSI. -PUMPED 67-BBLS.OF 80 DEGREES FAHRENHEIT DIESEL. 16:30 - 17:00 0.50 PERFOB P OTHCMP RIH WITH 9 STANDS FROM DERRICK FROM 528'MD TO 1382'MD. 17:00 - 18:30 1.50 PERFOB P OTHCMP POH FROM 1382'MD T0433'MD LAYING DOWN 4"DP DOUBLES. CHANGED OUT PS-21 SLIP INSERTS TO HAND SLIP INSERTS. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 6 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date: 3/27/2012 End Date: 5/11/2012 X3-0110G-C: (3,289,289.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:00 0.50 PERFOB P OTHCMP PJSM-LAYING DOWN PERF GUNS. DDI CREW,SLB CREW,DDI TP AND BP WSL. GENERATED HAZARD PLUS WORKSHEET TO IDENTIFY HAZARDS WITH HANDLING SPENT PERF GUNS IN ABSENCE OF DDI SOP. BEACON SCS NOTIFIED TO RESTRICT NON-ESSENTIAL PERSONNEL ACCESS TO RIG WHILE LAYING DOWN PERF GUNS. 19:00 - 19:30 0.50 PERFOB P OTHCMP POH FROM 433'MD TO 387'MD LAYING 4"DP DOUBLES TO PIPE SHED. LAYED DOWN XO, SLB LWD AND LUBRICATED BUMPER SUB. 19:30 - 21:00 1.50 PERFOB P OTHCMP LAYED DOWN SPENT 4.5"PERF GUNS FROM 387'MD TO SURFACE. ALL SHOTS CONFIRMED AS FIRED. 21:00 - 22:00 1.00 PERFOB P OTHCMP CLEAR AND CLEAN RIG FLOOR. STAGED SLB PERF GUN HANDLING TOOLS FROM RIG FLOOR TO GROUND LEVEL VIA BEAVER SLIDE USING JIB CRANE. 22:00 - 23:30 1.50 CASING P RUNPRD PJSM-REVIEWED DDI SOP-419 AND SLB PROCEDURE FOR RIGGING UP WIRELINE WITH DDI CREW,SLB CREW AND BP WSL. RIGGED UP WIRELINE TO RUN GR/JB AND USIT LOG. 23:30 - 00:00 0.50 EVAL P RUNPRD CALIBRATE DEPTH CONTROL TO RIG FLOOR. RIH WITH 6.0"GAUGE RING/JUNK BASKET. FLUID LOST TO PERFS SINCE FIRING GUNS= 19.0-BBLS. 1.26 BPH LOSS RATE 5/8/2012 00:00 - 03:30 3.50 EVAL P RUNPRD RIH WITH 6.0"GR/JB. 1ST RUN: SET DOWN AT 5824'ELM. WORK GR/JB THROUGH TIGHT SPOT. TAGGED UP AT 6304'ELM. WORKED GR/JB FROM 6320'ELM TO 5700'ELM SEVERAL TIMES. JUNK BASKET CONTAINED APPROXIMATELY 1 CUP OF DEBRIS. 2ND RUN: RIH AND TAG AT 6320'ELM. NO OBSTRUCTIONS ENCOUNTERED. JUNK BASKET WAS CLEAN-NO DEBRIS. LAYED GR/JB TOOL STRING DOWN. INSTALLED CAMERA SYSTEM IN DRILLERS CABIN. COMPLETE MP2 WORK ORDERS. INSPECT RIG MOVING SYSTEMS. 03:30 - 05:00 1.50 EVAL P RUNPRD PICKED UP USIT LOGGING TOOL STRING. US CALIBRATE DEPTH CONTROL TO RIG FLOOR. 05:00 - 11:00 6.00 EVAL P RUNPRD RIH WITH USIT LOG TOOL STRING TO 6390' ELM. LOG UP FROM 6390'ELM TO 5100'ELM. RBIH TO 6390'ELM AND LOG UP TO SURFACE. 11:00 - 12:30 1.50 EVAL P RUNPRD INSPECT LOG DATA QUALITY. 12:30 - 13:30 1.00 EVAL P RUNPRD RIG DOWN SWS E-LINE TOOLS AND UNIT. 13:30 - 15:00 1.50 RUNCOM P RUNCMP PULL WEAR BUSHING. PICKED UP AND MADE DUMMY RUN WITH 4-1/2"LANDING JOINT AND TUBING HANGER. Printed 5/29/2012 10:37:33AM North America -ALASKA BP Page 7 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date:3/27/2012 End Date:5/11/2012 X3-0110G-C: (3,289,289.00) Project: Prudhoe Bay Site:PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release:5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To Mrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 20:00 5.00 RUNCOM P RUNCMP CONDUCT DERRICK INSPECTION AS PER BP REP. BILL HOPKINS. STAGED 3-1/2" COMPLETION TUBING HANDLING TOOLS TO RIG FLOOR. STAGED I-WIRE SPOOLERS TO RIG FLOOR. CHECK AIR PRESSURE AND LUG NUT TORQUE ON MOVING SYSTEM TIRES AND WHEELS. 20:00 - 21:30 1.50 RUNCOM P RUNCMP WAIT ON COMPLETION HARDWARE TO ARRIVE. RIGGED DOWN STABBING BOARD AND STORED IT IN PIPE SHED. 21:30 - 00:00 2.50 RUNCOM N WAIT RUNCMP WAIT ON COMPLETION HARDWARE TO ARRIVE. CONTINUE RIGGING UP RIG FLOOR TO RUN 3-1/2"COMPLETION. FLUID LOSSES TO HOLE TODAY=20 BBLS. 5/9/2012 00:00 - 03:00 3.00 RUNCOM N WAIT RUNCMP CONTINUE RIGGING UP FLOOR TO RIH WITH 3-1/2"COMPLETION. 03:00 - 04:30 1.50 RUNCOM P RUNCMP LOAD COMPLETION HARDWARE INTO PIPE SHED AND PLACE IN RUNNING ORDER. VERIFY ALL LENGTHS AND HARDWARE PLACEMENT IN RELATION TO DOWNHOLE PERFORATIONS. PJSM-DDI RIG CREW, DDI TOOL PUSHER, SLB COMPLETION PERSONNEL,BAKER COMPLETIONS REP., AND BP WSL. REVIEWED DDI SOP FOR RIG UP AND RUN 3.5"TUBING. 04:30 - 12:00 7.50 RUNCOM P RUNCMP PICK UP AND MAKE UP 3-1/2"L-80 TCII COMPLETION HARDWARE AS PER COMPLETION RUNNING ORDER. BAKER LOK'D ALL CONNECTIONS BELOW BOTTOM PACKER. TORQUE TURNED ALL 3-1/2"L-80 TCII CONNECTIONS TO 2300 FT-LBS.AND USED JET LUBE SEAL GUARD THREAD COMPOUND. CURRENT FLUID LOSS RATE TO WELL=2.0 BPH. 12:00 - 18:30 6.50 RUNCOM P RUNCMP CONTINUE PICKING UP AND MAKING UP 3-1/2"L-80 TCII COMPLETION HARDWARE AS PER COMPLETION RUNNING ORDER TO 483' MD. TORQUE TURNED ALL 3-1/2"L-80 TCII CONNECTIONS TO 2300 FT-LBS.AND USED JET LUBE SEAL GUARD THREAD COMPOUND. 18:30 - 00:00 5.50 RUNCOM P RUNCMP RIH WITH COMPLETION BHA ON 3-1/2"9.2#, L-80 TCII TUBING FROM 483'MD TO 2453'MD. TORQUE TURNED ALL 3-1/2"L-80 TCII CONNECTIONS TO 2300 FT-LBS.AND USED JET LUBE SEAL GUARD THREAD COMPOUND. TESTED I-WIRE EVERY 30 JTS. FLUID LOSSES FOR 24 HRS.=15.0-BELS. 62 JTS. RIH AT 00:00-HRS. 5/10/2012 00:00 - 08:00 8.00 RUNCOM P RUNCMP RIH WITH COMPLETION BHA ON 3-1/2"9.2#, L-80 TCII TUBING FROM 2455'MD TO 6106' MD. TORQUE TURNED ALL 3-1/2"L-80 TCII CONNECTIONS TO 2300 FT-LBS.AND USED JET LUBE SEAL GUARD THREAD COMPOUND. TESTED I-WIRE EVERY 30 JTS. 108 JTS. RIH AT 03:00-HRS. 120 JTS.RI AT 04:00-HRS. 135 JTS RIH AT 05:00-HRS. FLUID LOSS RATE=1.0-BPH. 08:00 - 08:30 0.50 RUNCOM P RUNCMP MAKE UP SPACEOUT PUPS AND SET COMPLETION ON DEPTH AT 6148'MD. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 8 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/27/2012 End Date: 5/11/2012 X3-0110G-C: (3,289,289.00) Project:Prudhoe Bay Site:PB V Pad Rig Name/No.:DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 13:30 5.00 EVAL P OTHCMP MIRU SWS E-LINE UNIT. RIG UP PRESSURE CONTROL EQUIPMENT WITH 3-1/2"TCII PIN X 3-1/2"IF BOX XO,3-1/2"IF FOSV,4-1/2"IF PUMP-IN SUB,4-1/2"IF FOSV,QUICK TEST SUB,LUBRICATOR AND DOUBLE PACK-OFF. 13:30 - 14:00 0.50 EVAL P OTHCMP PRESSURE TEST SWS E-LINE PRESSURE CONTROL EQUIPMENT WITH DIESEL TO 250-PSI LO/2500-PSI HI FOR 5/5 CHARTED MINUTES. 14:00 - 17:00 3.00 EVAL P OTHCMP RIH WITH GR/CCL TOOL STRING. CORRELATE COMPLETION DEPTH(PACKER #3 BOTTOM AT 5887.49 AS PER ASSET REQUIREMENT. 117:00 - 17:30 0.50 EVAL P OTHCMP POH AND LAY DOWN GR/CCL TOOL STRING. 17:30 - 18:30 1.00 EVAL P OTHCMP RIG DOWN SWS E-LINE PRESSURE CONTROL EQUIPMENT AND STAGE TO PAD LEVEL. 18:30 - 19:00 0.50 RUNCOM P, RUNCMP POH AND LAY DOWN 3 EA.3.5"TUBING SPACEOUT PUPS AND JT.#177. PUW=90K, SOW=72K. 19:00 - 20:30 1.50 RUNCOM P RUNCMP PICKED UP LANDING JOINT AND TUBING HANGER. TERMINATED TANDEM I-WIRE IN HANGER. PRESSURE TESTED TUBING HANGER I-WIRE PENETRATIONS TO 5000-PSI. LANDED TUBING HANGER. FMC REP RAN IN LOCKDOWN SCREWS. RAN 193 FULL CANNON CLAMPS AND 21 HALF CLAMPS ON I-WIRE. 20:30 - 21:00 0.50 RUNCOM P RUNCMP RIG UP LINES TO SET PACKERS,AND TO PRESSURE TEST TUBING AND INNER ANNULUS. 21:00 - 22:00 1.00 EVAL P OTHCMP CIRCULATED TUBING VOLUME(54-BBLS.)TO CLEAR TUBING OF ANY POSSIBLE DEBRIS. -3.0-BPM @ 320-PSI 22:00 - 22:30 0.50 EVAL P OTHCMP DISCONNECTED HEAD PIN AND CIRCULATING LINES. MADE UP AND DEPLOYED"HACPA"(HIGH ANGLE COMPLETION PRONG ASSEMBLY)TO 3-1/2" TUBING. RECONNECTED HEAD PIN AND CIRCULATING LINES. 22:30 - 00:00 1.50 EVAL P OTHCMP PUMP HACPA DOWN AT 3.0-BPM AT 360-PSI. HACPA ON SEAT AT 50-BBLS.AWAY. TUBING VOUME=54.0-BBLS. PRESSURED UP TUBING TO 4500-PSI AND HELD FOR 5.0-MINUTES TO SET PACKERS. BLED PRESSURE DOWN TO 250-PSI AND HELD FOR 5 CHARTED MINUTES. INCREASED PRESSURE TO 4000-PSI FOR 30 CHARTED MINUTES. FLUID LOSS TO WELL LAST 24-HRS.=16.0-BBLS. 5/11/2012 00:00 - 01:00 1.00 RUNCOM P RUNCMP BLED TUBING PRESSURE TO 2500-PSI. PRESSURE TESTED VA TO 250-PSI LO/ 4000-PSI HI FOR 5/30 CHARTED MINUTES. **STOP POINT IN PLAN FORWARD TO GAIN WTL APPROVAL TO PROCEED.** MATT HERRERA-AOGCC WAIVED WITNESSING CASING AND TUBING INTEGRITY TESTS. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 9 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type: COM-ONSHORE(CON) Start Date:3/27/2012 End Date:5/11/2012 X3-0110G-C: (3,289,289.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:V-229 actual @95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 01:30 0.50 RUNCOM P RUNCMP GENERATED BPXA STP WELL TESTING CRITERIA CALCULATOR SPREADSHEETS AND MARTIN-DECKER CIRCULAR TEST CHART AND E-MAILED TO ADW WTL. PHONED WTL-SCHULTZ FOR APPROVAL TO PROCEED WITH OPERATIONS. RECEIVED WTL VERBAL APPROVAL TO PROCEED. 01:30 - 02:00 0.50 RUNCOM P RUNCMP BLED OFF TUBING PRESSURE TO SHEAR OPEN DCR SHEAR VALVE. VALVE SHEARED OPEN AT 2600-PSI DIFFERENTIAL PRESSURE. PUMPED 5.0-BBLS. BOTH WAYS THROUGH SHEAR VALVE AT 3.0-BPM AT 490-PSI VA TO TUBING AND 430-PSI TUBING TO VA. DISCONNECTED CIRCULATING LINES AND HEADPIN FROM LANDING JOINT. PULLED AND LAYED DOWN 4-1/2"TCII LANDING JOINT. 02:00 - 02:30 0.50 RUNCOM P RUNCMP FMC REPRESENTATIVE SET TWC WITH DRY ROD. 02:30 - 04:00 1.50 RUNCOM P RUNCMP PRESSURE TESTED TWC FROM BELOW TO 250-PSI LO/3500-PSI HI FOR 5/10 CHARTED MINUTES AND PRESSURE TESTED FROM ABOVE TO 250-PSI LO/3500-PSI HI FOR 5/30 CHARTED MINUTES. 04:00 - 05:00 1.00 BOPSUR P RUNCMP PULL AND SET BACK PS-21 SLIPS. PULL FLOW NIPPLE. DISCONNECT FLOW LINE AND FLOW LINE JET LINES. SKID JOE'S BOX. DISCONNECT CIRCULATING LINES IN CELLAR AND FROM SQUEEZE MANIFOLD ON BOP DECK. DRAIN BOP STACK. 05:00 - 09:00 4.00 BOPSUR P RUNCMP NIPPLE DOWN BOPE. PICK UP DRY HOLE TREE AND ADAPTER FLANGE TO RIG FLOOR. 09:00 - 12:00 3.00 WHSUR P RUNCMP NIPPLE UP DRY HOLE TREE AND ADAPTER AND TEST TO 250-PSI LO/5000-PSI HI FOR 5/ 10 CHARTED MINUTES. PRESSURE TEST TUBING HANGER VOID TO 250-PSI LO/ 5000-PSI HI PER FMC REQUIREMENT. SLB TEST I-WIRES. REMOVE KELLY HOSE FROM TOP DRIVE AND STORE IN DERRICK. 12:00 - 13:30 1.50 WHSUR P RUNCMP PICK UP DSM LUBRICATOR AND INSTALL ON DRY HOLE TREE. PRESSURE TEST LUBRICATOR TO 250-PSI LO/2000-PSI HIGH FOR 5/5 CHARTED MINUTES. 13:30 - 14:00 0.50 WHSUR P RUNCMP PULL TWC. 14:00 - 14:30 0.50 WHSUR P RUNCMP CLEAR AND CLEAN RIG FLOOR. SUCCESSFULLY PRESSURE TEST 0/A INNER VALVE TO 500-PSI. 14:30 - 15:30 1.00 WHSUR P RUNCMP PJSM-REVIEW DDI FREEZE PROTECT SOP WITH BP WSL,DDI CREW,M-I MUD ENGINEER&CH2MHILL VAC TRUCK DRIVERS.RIGGED UP LINES TO PUMP CORROSION INHIBITED BRINE AND FREEZE PROTECT WELL WITH DIESEL. Printed 5/29/2012 10:37:33AM North America -ALASKA- BP Page 10 of 10 Operation Summary Report Common Well Name:V-229 AFE No Event Type:COM-ONSHORE(CON) Start Date: 3/27/2012 End Date:5/11/2012 X3-0110G-C: (3,289,289.00) Project: Prudhoe Bay Site: PB V Pad Rig Name/No.: DOYON 25 Spud Date/Time:4/22/2012 12:00:00AM Rig Release: 5/11/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:V-229 actual©95.09ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 17:30 2.00 WHSUR P RUNCMP DISPLACE 9.0-PPG BRINE FROM INNER ANNULUS WITH 85-BBLS.OF 9.0-PPG CORROSION INHIBITED BRINE AND 87-BBLS. OF 80 DEGREES FAHRENHEIT DIESEL. CORROSION INHIBITED BRINE: -3.0-BPM @ 460-PSI DIESEL: 1.5-BPM @ 540-PSI ICP,785-PSI FCP 17:30 - 18:30 1.00 WHSUR P RUNCMP ALLOW DIESEL TO U-TUBE FOR 1.0-HRS. BRIDLE UP TO SCOPE DERRICK. 18:30 - 19:00 0.50 WHSUR P RUNCMP STAB DSM LUBRICATOR ON DRY HOLE TREE. PRESSURE TESTED SAME TO 250-PSI LO/ 3500-PSI HI FOR 5/5 CHARTED MINUTES. SET BPV. 19:00 - 21:00 2.00 WHSUR P RUNCMP PRESSURE TESTED BPV FROM BELOW TO 250-PSI LO/3500-PSI FOR 5/30 CHARTED MINUTES. INJECTION PUMP LINE TO RIG FLOOR DEVELOPED DIESEL LEAK(25 GALLONS)INTO SECONDARY CONTAINMENT FROM KEMPER 1502 HAMMER UNION. BLED PRESSURE FROM LINE TO STOP LEAK. REPORTED LEAK TO 5700, PAD OPERATOR AND ADW BASE OPERATIONS SUPERINTENDENT. CLEANED UP DIESEL WITH RIG VACUUM SYSTEM AND ABSORB. REPLACED SEAL RING IN HAMMER UNION AND RECONNECTED. PRESSURE TESTED INJECTION PUMP LINE TO 3500-PSI(GOOD TEST). RE-PRESSURE TESTED BPV FROM BELOW TO 250-PSI LO/3500-PSI FOR 5/30 CHARTED MINUTES. BLEW DOWN STEAM LINES. DISCONNECTING RIG COMPLEX INTERCONNECT SERVICE LINES. 21:00 - 00:00 3.00 WHSUR P RUNCMP PRESSURE TESTED VA INNER VALVE TO 500-PSI. NIPPLE DOWN VA AND 0/A OUTER WORKING VALVES IN CELLAR. DSM RIG UP LUBRICATOR AND INSTALL VR PLUG IN 0/A AND PRESSURE TEST SAME. RIGGED DOWN AND BLEW DOWN SQUUEZE MANIFOLD LINES. SECURE CELLAR AND TREE. "*RELEASED RIG AT 00:00-HRS.** Printed 5/29/2012 10:37:33AM N ^Ire rO EM 0N nM m p umHaN l N yym '01v05 N M _ P EVMMN MQ MhpNN pQNmN nn 0<V<O Q ]MMNONN00 Qm NWWMO NWON NWaNNNNN N NNN NNN NN NNNN aJemmnm moama "erm mmmmmomopmmcspmumormmompmm QQQQ QQQaQ raQQQQQQ ,1-,1-4-4-a QQQQQ QQQQQ Qv-Q,, C_ V V^ OO' p .'20:227 TM Af 22322 lO p W 001pN NOnMOT OOQ0N VQoM' M08O V NNr N Q4P.26-4 N4T0bQN Qn.QWNnOyTNTm.mSOYomOOO0N CbQH " drD, WNONONNYON N0 M0 0 N0 N00000 NNN0 NMo Nn No1 Nr0Nn0 No N0 No tNr0 tNOh O r r0 n0Nr0n0n0r0 r0n0n0r0r0 r0 M on M on n 0O 0 \ OO "6.q"°. C N� G'1N01 O W O0t0 Nm000+1 lGON1t0pM0 TN 0h00N 000) o 0 N 00 m0 O v10 '-�r �Np; Nr N nN�pi GooaNlV N�l�M� NI�iO ET,, e� tv vqi 6N b XW W W W W 2"" nr r r rr W GDT T{Op{§p �N�pp{Mlpp lNtpplrtpp{T{pp M EE g QAQ1 O s W O O O O 22222 O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 N KNEE N Nh hh HIM �GTINNNN 222,22 NNNN N 22222 T ETNN N h C NNmNnNGrV ^�M0 vmQn W N O t;r N GoN H W 0Mg CmA00N1 dT H§p§ zsEE, 0 OOV 0 00oA ' E.^ nZOtWWWW NWFE WM Thi, NNNN NTNNN TTTfTOT NTT0T J Q"" f lDN ^GJNQGD Tr °..: trh GO'f N V:t On O, lr� A Q1 HNN Q< E0 OTi� Q r NON NT�d k E D O� �O �V� N�-C C ��l'M O M N M M N O V O�l V O O<� i 3"ET 0�<N m ENN W ^TN 2 O N N T nt T QY l N 2.;;54 GD N N 2,7222 O T Np 0 7.P.1 WOOON N,'ONoCW Wl 7 NEQNrQ 4pm, rQry TTM m r�p 2." 23871,t3 C1 Mmtp01 rrn h0 41:;,70,12 lr�NNO �O<OW22P-.23 22-.23 NONNO 2.05P,'“OP,0 2 666.'4 N, NWT p0W--S NONON N0(0NN NN0WN 0NrQGTi WNQr( 0 000 MM00N WWrrW TTO,- - Q -- - N 3 22. 0) C (0(0 N 2 C d N XOONN O nNMMtO ',,,13g:;:2 O RC1 Ol0T:2,:.'43.4 th NYl O COT NO m�OE N W Q r0 W r A l 0CN mtm1O l p .n�N N 0 O N T N 2 0 d 0 > C O O Ot]-N lT^GV G O)Qp NtnN M W QO IQ� QO NN,Q W U E%-a W O N, V O NthO 1pmT NYI NN M N'I tTh h m Q m TTo<N W E o C I-C C ooy e N N G o 2 U N N O N-^Q Q N C N O CO O y O E a E U� Z O 'p 2 7 O K 01 N N N GOD gL m 2 0 N 3 C a QE `Nr.-2-7'42nMv22ONyy00NNCM NSN0 N ONN N003 Q00000 0NN - ""FAT ON0Np mm0NOOM N0N 0E0 O EWN W NNNM MQQO NbnrW T0O'' 'M^ . QZ O of s Nd Eg g. _w o£ 5i ° mfg pp1 a I�f� C o O W C to B N C U C Z~d 0-0.0m00- n,TI« N01iON Q V N.,T 'c°6°'.° ' m GOOOMI EN N,ONi NCOWi NO 22'32 m V O y C Y J- U Tel "9- N NNN W NNN r Oil?NNN NNNr ONCO '0;28 MOON m NO N T O` d 60 d 2O .-N MQ 0'07:! ^�Q W A .,4'. WW p d E E 2 O m 0 .5 W d j r N N N M th M Q O h N tO r r W T T O�N N M'Q< ff//ll ff//l1 d d 3 dt T R 9 l LL 1C rya t V 8 U a2Nw0p aafZamJ C O OTO W TNv rr W N rTrWM M T O $232`4. mNN TMON02233r8. Nyatr r M O W rN , n m IT: a 1- 0 Q7" NiOE Oc03 M00 Vmm. 0 N tWTt011 NV - m-v- NN NNNNN N00NN NNNN N oCa T O T T m Q O N W T M M 2,7i3.22 M N O09.421°4 Q N N W Q T W E T M Q N N N E000 W W lO C0 0 TNnQM ON W TN Q00CD 0 W NQS W b W O N O 0 m W W W MNO W W r N 0NNWT gnu QQ NM m th QM G > g$7;0 N N Q�p t p 0 0 0 0 O 0 0 r Q M T Q O O N N ',50.1 W T F Q N ,000- N G'1 Q p l0 r W T T O N N Q d N W r r � N NNN N N NNN N N NNN N IL� V Q N l0 Q Q QO h r %e OO O 0 m W QO O T P�p O n M 3 4,%.,1“ r W N N Q T T M N N O .7!2P.26-,. < W lO T lO .0 O - F O O N 0 0 0 0 t p 00— -.20" l V N N An0 E ���� �� � NNN N Ntv N o r Gj'O Q W c a o . c a w - d w ' o 71'm 1O D o E'..1(7 ¢1y >N o N>O y NQ�G C NToN _x•00'A2 n h0 n7 220'n2 p n42 3, 22222 m22O mONot F2.2222 20° 2 N ,ST> NEY'mo - OOOV MQ.nW OIN O 7,NNO NHWOM E;4 4 0 hNNTN STVAI N.2 '9-- �mCgG- dPNE a` N WO OWLdNNONMN0 Ima > 3c3zzO cTAI p EOT00n 0 2822; N n N N1m 2 2322 228.'4Y:2. W p' NC R.0N<^ O N 2c 0 0Qh ENNWm tNQOl7NN00000O GrCON N00p N0000T- ,.Wr 0N0- .W. WTN NW N00 0NMQ E -- .. � N NNNN NN0M M,MM O i g O 12,P; d` ID mW ..y1- E c W3 T i 5$23dd d OQCLE «Od UVd z.32 ,10! O- NmO o .5 . rdwE70oE Ec M.N�mQN NrUJJ UU' U K d, ❑ N O a. yy ,-012 ,-wwww $y MMD,w8 N 00a ' - ,4WVDO WN,-,w N,,Ww r' EllA228 mW N p OWWm - 0e82 vvOWW HRH NRWNpO WCNNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNN d J OaOvo OOa00 aaaaa OOOoa 00040 44.140 Oat d f rl 1_ p _ f p $ ytNN NRMryEGpW2eyn iotar98R4,.p.,hMMM MMM000 VMhMMM MMMMO2MM1pM MMMM M2M Ncp Oh O0 00000 GCC G 00000 GOO 0 G G 00000 G G O0 0O 0O 000 NN hOW U, P^ 212M0 20283 Wm2172rblr0WM SAPV71NOOOmOmm ME 22R0 4T�N ,Ilvv , stoggg v"am WOOOO00000O 0 00000 q-.-NMA '4'24 22222 2222 222222a2S22 222222 2222 222220 22222 2 2 2 Cm 0F ,z.A2 .4$4nM OEo PV4ORNq,e. O,!, O22s la a0Npn rlWrfi .mi owe QtiR,:n 2 rr ;7.,,.. ,, rr_, NNrNrN mil Onrrn rQr 22222 22222 22222 .2222 22222 22222 222 jg28842 200104 0.44070 :24448 mWO22 NOOMO OOo 660166 C1VV�G . CC.- .-,-,,Ovi GGOGG�PVG OO 88 8024'44 YoMM1pi g' 26-4V,04 WO.- WhaD<N eimiofV gpEDOWo:6666.—g6aOO�CI 22244 4444 4 .4. AM223 222.. mpmO Or^ O Z ...... A gRgq {{+y1((yy pmp p SM tp -, $ $$$$ Z C r22RM C2V g8A NR M.1Of 0mm�PO'1 M 200{00 SM0p01N Omr 2 num pry1(py1(Oy1�Wy(py1 XOO O�rpO va�O 2X20 pNN 0(2y{�ryy{OR01�p�p 1h�0p�0p0 020 pmpR (ry(CyD On yOy�1t��OO C NNNNNN ':I'z rn '2tO" MOT W NN NNNN N NNNNN N RM17 44 MM 222 O »»» 18V N m 4 N W 6 N 00 N 1_ WNW20 aOMY p4242 '242 00p:2 08008 R4t3o O0 ,ro f p 22022W 004 . R4RWW xM U 4008NN NNNR INNR Nm8AM RMAAO 222 N 1 N 1p to 1� t0�O ♦ yy�1 n t0 O �n W d O E tV M:430A 1202.22�On 1$�M8 846 1G2p�M0420 $�8 R Wg P4s. O N1♦0 t1+R O 722 M 'I E a ----W OT W Oc'N NNNNN 1V NNNN N1010'0((OOPN9 m2A22 1201RIt20 1 M o r 2 R 2 C s. VI E RC1 Oi,•Of r.:a1p•ei N tV (r_'ci{mi a4 Pl poi fis/oi�peii .4M .-4441.44R 4 eii 86 ri(_y (M{tray)oi(Gb HI O:1np W fn�2� CO > N 220 CND 20T NN N NNNN N NNN N 210100/10 lO2 AA2 2l.2j 2 o u_o u.mu_Z L owaz 77 Upm WW W e NmMOR mvWN AV.2WV. 42.m0 O200m 40W8M gm O0 mm 82 *822 T82 NNMM 2222 224% 0m 2 ,?? 444 4440 V0 E E SE24mAmOo 224%.1 mw. 22.$22 om2 "2221rvm002y 2c% PECcccccc RAM224 4NNNoM MNNOM MQ428%4 avea4'4444v4 7 T ¢ ct-ca 0 W 7 m W . �rppN0 22002 4orp0NNN2� 0, OO 02��V AZA U FppSSNMO2 7 6GROCD Oi' AAA 6mmmm 6066 OcCD" R"m RR 008 • 'w E -- ' D axP6G _rcp6 n222152 O2WH A LL N WO1 yy tp 1(+01 a�p {y(�p1 1y C W J P:. o�003 QNCDA 2332A 722 W 0 :22228 CDOImO mm2 10 O$�000 0 R W �Ng4d :2040 40066 Oc-66N rrrriui 44444 44: m 1EgcEairiM =';:8 K O O V r N O a W Q f M 1N0(MOccp p W J f/j ((�� O aLL LL 3 p N JON fE $ '. p2W: 002V OQ2O.V.po4'7, 2WoNC MpO Ni' 2 2 8 4p apopNm rp2244;44 4444 4..4 32220 w, 22mM N O O O O_ N _ C N 0 E g N U_ .` o I wk n n p McMains, Stephen E (DOA) From: Lastufka, Joseph N (Northern Solutions) [Joseph.Lastufka@bp.com] Sent: Wednesday, August 29, 2012 4:37 PM To: McMains, Stephen E (DOA) Subject: PBU V-229/ PTD#212-016 Hi Steve, Please reference the following well: Well Name: PBU V-229 Permit#: 212-016 API #: 50-029-23464-00-00 This well began Injection on: 8/1/2012 Method of Operations on this date: Water Injection RBDMS AUG 2 9 2012 9fh* I ' r 6 AJ r SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Orion Schrader Bluff Pool, V-229i BP Exploration (Alaska), Inc. Permit No: 212-016 Surface Location: 4668' FSL, 1716' FEL, SEC. 11, T11N, R 11 E, UM Bottomhole Location: 2932' FSL, 992' FEL, SEC. 2, T11N, R11E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, :I Daniel T. Seamount, Jr. Chair DATED this 1day of February, 2012. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) - t STATE OF ALASKA RECEIVED��'° � ALAS OIL AND GAS CONSERVATION COMM. 0 o?-A/� PERMIT TO DRILL FEB 0 3 2012 20 AAC 25.005 1 a.Type of work: lb.Proposed Well Class: 0 Development Oil 0 Service-Winj 0 Single Zone A ic. e i if w II is r osed,for; ® Drill 0 Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zonerlia6 ea 440 �i I pp 0 Re-Entry 0 Exploratory ®Service-WAG 0 Service-Disp Af1Ch0183Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single We aName an um er: BP Exploration(Alaska) Inc. Bond No. 6194193 V-229i 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 6400' ND 48 .1_ --1 Prudhoe Bay/Orion Schrader 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bluff Surface: ADL 028240 4668' FSL, 1716'FEL, Sec. 11,T11N, R11E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2490' FSL, 1103' FEL, Sec.2,T11 N, R11 E, UM March 1,2012 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2932'FSL,992' FEL, Sec.2,T11 N, R11 E, UM 2560 12840' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 94.8' feet 15.Distance to Nearest Well Open Surface: x- 590587 y-5969916 Zone- ASP4 GL Elevation above MSL: 54.0' feet to Same Pool: 600' 16.Deviated Wells: Kickoff Depth: 250' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 55 degrees Downhole: 2144 Surface: 1664 ` 18. Casing Program: _ Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 42" 20" 91.5# A-53 WLD 80' Surface Surface 105' 105' 260 sx Arctic Set(Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 3332' Surface Surface 3332' 2820' 1208 sx DeeoCrete.366 sx Class'G' 8-3/4" 7" 26# L-80 TCII 6400' Surface Surface 6400' 4891' 51 sx LiteCrete. 263 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): Casing , Length Size Cement Volume MD. TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20.Attachments: 0 Property Plat IN BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Ryan Ciolkosz,564-5977 Printed Name Ken Allen Title Engineering Team Leader cv�� Prepared By Name/Number > Signature . _. 76. Phone 564-4366 Date .3 2_ Joe Lastufka,564-4091 Commission Use Only Permit To Drill API Number: Permit Approv�aliDate: See cover letter for Number: ,W076160150-L?9a23-�6�GY'9O Z '117 other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: [r Other: v 1/0°° /OS" o r 105 Samples Req'd: ❑,Yes 'No Mud Log Req'd: Oyes 131<lo Z S- P A ��y -(..- ) HHZS Measures: "Yes 0 No Directional Survey Req'd: 0 Yes 0 No nGW a-oc AWL ^�' - C�oc>v� �6 �E�o �S v33C�� M 1 "l- f"" _ / /Z APPROVED BY THE COMMISSION -Z./7 L 7 Date i- • ,COMMISSIONER Form 10-401 Red 07/2009 This permit is valid for 24 month a p v 1(20 AAC 25.005(g)) Submit In Duplicate Well Name: V-229 Drill and Complete Plan Summary Type of Well (service/ producer/injector): WAG Injector Surface Location: X=590587 Y=5969915 As-Built 4667' FSL, 1715' FEL, T11N, R11 E, Sec. 11 Target Locations: X=591160 Y=5973025 Z=4344 Top OA sand 2490' FSL, 1102' FEL, T11N, R11 E, Sec. 2 Bottom Hole Location: X =591265 Y =5973468 Z=4706 2932' FSL, 991' FEL, T11N, R11E, Sec. 2 Bob Dawson Geologist 564-5264 Mike Francis Prod. Engineer 564-4240 Ryan Ciolkosz Drilling Engineer 564-5977 API NUMBER: TBD Rig: Doyon 25 Estimated Start Date: 3/1/2010 Operating Days to complete: 35 MD: 6400' TVD: 4890' RT/GL: 40.8'/54' RTE: 94.8' Well Design: Grassroots Schrader Bluff Injector 3 1/2" tbg, 9.2# L-80, TCII, multi-packers, WAG Injector Objective: WAG Injector into Schrader Bluff OA, OBa, OBb, OBc, OBd Directional Plan: Version: SLB WP 9b KOP: 250' MD, build 1/100 Maximum Hole Angle: 55.39° Close Approach Wells: All wells pass major risk criteria. Reference anti-collision report Nearest well within Pool: V-105 and V-123 600' ✓ Distance to Nearest Property 12,840 PBU unit boundary Line: V-229 Permit Application Page 1 Wells Within 1/4 mi. Within pool V-105 600 ft from V-229. Miscible Injector into Schrader Bluff and Kuparuk No anncomm issues See area review for details V-123 600 ft from V-229. Kuparuk Injector No anncomm issues See area review for details V-106A 1170' away from V-229 Kuparuk Producer No anncomm issues See area review for details V-204 1170' away from V-229 Schrader Multi-lateral Producer No anncomm issues See area review for details V-202 1170' away from V-229 Schrader Multi-lateral Producer No anncomm issues See area review for details V-216 1070 ft from V-229 Schrader Water Injector No anncomm issues See area review for details Logging Program: Surface Interval Drilling, MWD: GR Open Hole: None Cased Hole: None Production Interval Drilling, MWD: GR, RES, NEU, Density, PWD Open Hole: MDT oil samples and formation pressures Cased Hole: USIT (Primary Depth Control Mode) Mud Program: 12 '/4" Surface Hole: Spud Mud Funnel Plastic API Fluid Interval Density Viscosity Viscosity Yield Po2nt Loss pH (ppg) (seconds/qt) (cp) (Ib/100ft ) (mis/30min) Initial to Base Perm 8.8-9.2 400 -300 55 - 30 70 - 55 NC- 8.0 9.0 -9.5 Base PF to top SV1 92 .95 250 -225 55 -30 60 -45 8.0 9.0 -9.5 (surface hole TD) V-229 Permit Application Page 2 8 3/4" Production Hole: LSND Mud DensityPlastic API Yield Point Interval (PPM Viscosity (Ib/100ft2 Fluid Loss pH MBT (cp) (ml/30 min) SurfaceCsg. g0 - 9.4 12 - 18 18 -24 < 6.0 9- 10 < 18 Shoe to TD Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Connection Length Top Btm Tbg O.D. MD/TVD RTE MD/TVD RTE 42" Insulated 20" _ 91.5 A-53 WLD 80' GL 105'/ 105' 12 1/4" 9 5/$" 40 L-80 BTC 3332' GL 3332' /2725' 8 3/4" 7" _ 26 L-80 TC-II 6400' GL 6400' /4890' Tubing 3 %.,, 9.2 L-80 TC-II 6090' GL 6195' /4652' Comments: Tbg crossover to 4 1/2"just below tree Integrity Testing: Test Point Depth Test Type 9 5/8" Surface Casing 20' —50' from surface shoe LOT Cement Calculations: Casin Size Surface Casing -9-%" 40 ppf L-80 BTC - Single Stage Basis Lead: Open hole volume + 250% excess in permafrost, 40% excess below permafrost. TOC at surface. Tail: Open hole volume + 40% excess + 80' shoe track. TOC is 895' ft above Surface Casing Shoe. Fluid Sequence and TAM port collar potentially run at 500' MD as a contingency for cement to surface. Volume: Wash None Spacer 100 bbls of MudPush II weighted to 10.0 ppg Lead 407 bbls(1208 sks) 11.0 ppg Deeperete— 1.89 ft'/sk , Tail 76 bbls (366 sks) 15.8 ppg Class G— 1.16 cuft/sk r' Temp BHST= 56° F In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. 4 Casingi Size Production Casing —7" 26 ppf L-80 TCII - Single Stage "--"/ Basis Lead: Open hole volume + 30% excess. TOC is 1000' MD below surface casing shoe Tail: Open hole volume + 30% excess+ 80' shoe track. TOC is 4908' MD Wash None Spacer 30 bbls of MudPush II weighted to 10.2 ppg Lead 17 bbls (50.5 sks) 11.0 ppg Litecrete— 1.89 fts/sk ✓ Tail 55 bbls (263 sks) 15.8 ppg Class G— 1.17 ft3/sk Temp BHST=94° F V-229 Permit Application Page 3 Pore Pressure Prediction Estimated Fluid Formation Depth Type Most Likely Top Uncertainty (For Pore Pressure Formation (TVDss) (+/-TVD ft) Sands) (EMW ppg) G1 -245 +/-25' wet 8.37 SV6 -895 +/-25' wet 8.37 EOCU -1,460 +/-25' wet 8.37 SV5 -1,565 +/-25' wet 8.37 Wet above BPRF, SV4 -1,690 +/-25' hydrates in 8.37 sand below. BPRF -1,700 +/-25' 8.70 SV3 -2,100 +/-25' hydrates 8.37 SV2 -2,280 +/-25' hydrates 8.37 Fault#1(V-Pad -2,330 +/-100'M.D.-see Fault Section for Fault) Details SV1 -2,480 +/-25' hydrates 8.37 UG4 -2,773 +/-25' Coal 8.80 UG4A -2,806 +/-25' Heavy oil 8.80 UG3 -3,150 +/-25' Heavy oil 8.70 UGI -3,660 +/-25' Heavy oil 8.70 UG_MA -3,950 +/-25' wet 8.70 UG_MB1 -3,995 +/-25' wet 8.70 UG_MB2 -4,060 +/-25' heavy wet oil/ 8.70 UG_MC -4,120 +/-25' wet 8.70 SB_NA -4,185 +/-25' wet 8.70 — SB_NB -4,205 +/-25' wet 8.70 SB_NC -4,240 +/-25' wet 8.70 SB_NE -4,250 +/-25' wet 8.70 SB_OA -4,344 +/-25' oil 8.70 / — SB_OBa -4,407 +/-25' oil 8.40 SB_OBb -4,448 +/-25' oil 8.40 SB_OBc -4,505 +/-25' oil 8.40 — SB_OBd -4,558 +/-25' oil 8A0 SB_OBe -4,620 +/-25' oil 8.60 SB_OBf -4,665 +/-25' oil 8.60 BaseOBf -4,713 +/-25' n/a 8.60 T.D. -4,796 I 8.60 V-229 Permit Application Page 4 Well Control: The 12 1/4" hole will be drilled with diverter. The 8 '/<" intermediate hole will use well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Annular preventer will be tested to 3500 psi. Rams will be tested to 4000 psi. The BOP test frequency will be conducted on a 14 day frequency, with a function test every 7 days. Except for significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Production Interval- • Maximum anticipated BHP: / 2144 psi @ 4796' TVDss, 8.6 ppg EMW • Maximum surface pressure: 1664 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) • Planned BOP test pressure: • Annular Preventer 250/3500 psi • Rams 250/4000 psi • Planned completion fluid: 8.8 -9.4 ppg brine/6.8 ppg diesel Kick Tolerance/ Integrity Testing Summary Table Casing and Casing Test Maximum Mud Weight Exp Pore LOT/ Interval Pressure Influx Press FIT Volume 95/8" Surface 3500 psi 50 BBLS 9.0 8.6 LOT Casing (assuming 11.3 LOT) 7" Production 4000 psi NA NA NA NA Casing Disposal: • No annular disposal in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for disposal. Haul all Class I wastes to Pad 3 for disposal. Variance Request: To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line. 20 A4c 2.3-.033C�) V-229 - Drill and Complete Procedure Summary Pre-Rig Work: 1. Weld an FMC landing ring for the FMC Gen 5 wellhead on the conductor. 2. Shut-in V-105, V-216, V-222 V-229 Permit Application Page 5 3. Remove well houses 4. Level the pad and prepare location for rig move. Rig Operations: 1. MIRU Doyon 25. 2. Nipple up and function test diverter. Take on spud mud. PU 4" DP and rack back 3. MU 12 /4" drilling assembly with MWD/GR and directionally drill surface hole to the bottom of the permafrost. Wiper Trip the Permafrost 4. RIH and Drill to surface hole TD. Approximately 40' TVD above the UG4. POOH 5. Run and cement 9 5/8" 40# L-80 BTC surface casing. A TAM port collar may be run at 500' as p contingency. ,n,;4:L /,4M s 6. ND diverter and NU casing / tubing head. NU BOPE and test to rams to 40QOpsi and annular to 3500 psi. 7. Make up 8 3/4" drilling BHA with MWD/GR/RES/Den/NEU/PWD and RIH to float collar. Pressure test casing to 3500 psi for 30 min. Chart test Drill out shoe track and displace well to LSND drilling fluid. Drill 20' of new formation and perform LOT. it,3 ,'i) 8. Drill ahead to production hole target TD. Clean up hole and POOH 9. RU Schlumberger E-line. RIH with MDT logging tools and take fluid/pressure samples. 10. Perform clean out run with "dumb iron" BHA ,_-. 7' >�,i►ws 11. Run and cement the 7" 26# L-80 TCII production casing. Reciprocate casing throughout entire cement job. Displace with 8.8 - 9.2 ppg brine. Pressure test casing to 4000 psi for 30 minutes at plug bump. Chart test. Install and test 9 5/8 x 7" pack-off 12. Freeze protect the 7" x 9-%" annulus. Confirm 500 psi cement compressive strength prior to freeze protecting. 13. PU DPC guns and RIH w/-190' of 4.5" Power Jet 5 spf, perf guns with LWD GR for gun correlation. 14. Space out perf guns by utilizing GR and LWD log. Confirm cement compressive strength is at least 1000 psi before firing. Perforate OA, OBA, OBb, OBc, OBd. POOH. LD DP and guns. 15. RU Schlumberger E-line. RIH with gauge ring and junk basket to recover any perf debris. 16. Run USIT log following Primary Depth Control procedures. Log from just above float collar to surface "31--- 17. "-t3L_17. Run the 3-'/2", 9.2#, L-80, TCII completion with (5) 7" x 3-W straddle packer assembly, I-wire, gauges, and injection mandrels. Torque turn TC-II threaded tubing. 18. Space out packers using GR/CCL. 19. Run in lockdown screws, drop prong assembly and set the packers. Give AOGCC 24 hours notice, then pressure test tubing to 4000 psi. Bleed tubing pressure down to 2500 psi and pressure test IA to 4000 psi while holding pressure on tubing. 20. Shear the DCR-1 valve and pump both ways to confirm circulation ability. 21. Install TWC. Test TWC to 3500 psi from above and below. Nipple down the BOPE. Nipple up and test tree to 5000 psi. RU lubricator and pull TWC. 22. Freeze protect the well to 2200' TVD by first pumping corrosion inhibited brine down the IA with rig pumps followed by diesel down IA w/ Hot Oil truck, taking clean brine returns to surface. Allow diesel to U-tube into tubing. 23. RU lubricator and Install BPV in tubing hanger. Test BPV from below to 3500 psi. Install all annulus valves and secure the well. 24. RDMO. Post-Rig Work: 1. Pull BPV 2. MIRU slickline. Pull shear valve from top mandrel and replace with a dummy GLV. 3. Pull dummy valves from injection mandrels and replace with injection valves. 4. Install wellhouse and flowlines V-229 Permit Application Page 6 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Maximum reservoir pressures anticipated: Interval Psi (EMW) TVDss (ft) MD (ft) Schrader Bluff 2144 (8.6) 4796' 6400' Sands II. Hydrates and Shallow gas: A. Rig should expect to encounter gas hydrates in the SV sands below the Permafrost base. Use standard operating procedures for hydrates, if encountered. Set surface casing below sand hydrate zone to isolate gas bearing intervals behind cemented pipe in surface hole from intermediate hole section. III. Running Gravels: A. Unconsolidated sand, gravel, &cobbles and thawing permafrost could impede well angle build and casing running through permafrost. Keep moderate to low build angles until out of permafrost section. Keep flow rates low. Hazards include cobbles/boulders, running gravels, wood, lost circulation and tight hole problems while drilling and running casing. See Pad data sheet for details. IV. Broaching: A. Surface broaching in nearby wells has been an issue on past V-pad wells. Drill out the conductor with high viscosity spud mud. Do not drill out the conductor with water. While drilling surface hole, watch for losses and monitor the nearby well houses for flow V. Lost Circulation: A. Drilling mud losses up to 2107 bbl have been encountered while drilling surface hole on V-pad. If mud losses occur, reference standard operating procedures, including running LCM and increasing mud viscosity. VI. Kick Tolerance/ Integrity Testing: I Kick Tolerance/ Integrity Testing Summary Table Casing and Casing Test Maximum Mud Weight Exp Pore LOT/ Interval Pressure Influx Press FIT Volume 95/8" Surface 3500 psi 50 BBLS 9.0 8.6 LOT Casing (assuming 11.3 LOT) 7" Production 4000 psi NA NA NA NA Casing VII. Heavy Oil A. Heavy oil is expected in the Ugnu sand intervals which could result in plugging of shaker screens. Follow established operating practices for drilling in heavy oil zones. VIII. Hydrogen Sulfide V-229 Permit Application Page 7 A. All V Pad wells are expected to have H2S levels as high as 46 ppm range. While no H2S is anticipated on this site, standard H2S precautions should be followed at all times. H2S Summa Table Well Name H2S Level • •m Date of Readin• #1 Closest BHL Well H2S Level V-202 40 ppm 3/6/2011 #2 Closest BHL Well H2S Level V-204 46 ppm 3/2/2011 #1 Closest SHL Well H2S Level V-204 46 ppm 3/2/2011 #2 Closest SHL Well H2S Level V-109 46 ppm 1/4/2011 Max. Recorded H2S on Pad/Facility V-117 300 ppm 4/3/2007 VIIII.Faults A. Penetration of the fault#1 will occur during drilling of the SV2 interval. Fault throw: southwest direction, approx. 100 to 140'. Many of the well drilled to the west of the pad have crossed this fault without issues CONSULT THE V PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION V-229 Permit Application Page 8 by 0 V-229 Area of Review V-229 is a Schrader injection well targeting OA, OBa, OBb, OBc, OBd sands. The following six wellbores are within 1/4 mile of the planned V-229 wellbore within the Schrader formation. The primary cement jobs for each wellbore and current well status are provided. 1) V-105 a) 600 ft from V-229 in Schrader reservoir b) Well Status: Miscible Injector. Currently injecting. c) Production Casing: 7", 26#, L-80 set at 8,243 ft MD, 7,123 TVD. ES cementer at 6011' MD i) 1st stage 35 bbls 15.8 ppg lead. Bond Log shows top of cement at 4406' MD ii) 2nd stage 69 bbls 15.6 ppg lead. Bond Log shows top of cement at 7350' MD 2) V-123 a) 600 ft from V-229 in Schrader reservoir b) Well Status: Water Injector in the Kupaurk formation. Currently injecting c) Intermediate Casing: 7" 26# L-80 top set in the Kuparuk at 9759 ft MD/6717' TVD. i) 287 bbls 11.5 ppg lead and 66 bbls 15.8 ppg tail cement. Estimated TOC 3400' MD 1/ d) Production Liner: 3-1/2" 9.2# L-80 set at 11759' MD i) 74 bbls 15.8 ppg class G. Estimated TOC from CBL: 10,420 MD 3) V-106A a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Kuparuk Oil producer. Currently producing c) Intermediate Casing: 7" 26#top set at 9407 ft MD/6656' TVD. i) 137 bbls 12.5 ppg lead and 38 bbls 15.8 ppg tail cement. Estimated TOC: 4454' MD d) Production Liner: 4-1/2" 12.6# L-80 set at 13228' MD i) 104 bbls 15.8 ppg lead. 20 bbls contaminated cement circulated off top of liner at 8710' MD. 4) V-204 (L1,L2,L3) - Multi-lateral with 4 laterals in the Schrader a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Schrader Oil producer. Currently producing c) Intermediate Casing: 7-5/8" 29.7#top set at 5408 ft MD/4638' TVD. i) 101 bbls 15.8 ppg Class G lead. Estimated TOC: 3377' MD d) Production Liner: 4-1/2" 12.6# L-80 Slotted Liner in the OA, OBa, OBb and OBd 5) V-202 (L1,L2) - Multi-lateral with 3 laterals in the Schrader a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Schrader Oil producer. Currently producing c) Intermediate Casing: 7-5/8" 29.7#top set at 5966 ft MD/4638' TVD. i) 94.7 bbls 15.6 ppg Class G lead. Estimated TOC: 3589' MD d) Production Liner: 4-1/2" 12.6# L-80 Slotted Liner in the OA, OBa, and OBd 6) V-216 a) 1070 ft from V-229 in Schrader reservoir b) Well Status: Water Injector in the Schrader formation. Currently injecting c) Production Casing: 7" 26## L-80 set at 6801' MD/4908' TVD i) 66 bbls 15.8 ppg class G. Estimated TOC from CBL: 4,513 MD II, i z a m o IX w a% at i u y m ON Oi !1 O� O 001 4 z a a g z x > i 08 0H oil 1, - Nr., v m m n mo�•g 30l 'lll oi IIi 01 � ti E O 1eoito! ojoI 3 0e h - IL 0 OH OH ° off off off o1 off o1 i �i 9 c zY a .1N • Itut I A pAmok. It 14 r—, — a OW I. g-'.°,)co e )1 Irrilil-411—Vali In (IT k co u, 101 W,� Q�o� — co V Q v_r_ i' a ` . -p I z s -410 or- • 1 v' I Mme, . oCW g2 , c'< __ I I .1 g we.;• fyo 3 II JI Q. a"' Eli o fl'.�^ .ye> ••II III O .:fir :< Edi f 1 111 1 III = 1 III I III 1 ali 1 III �u ullm z , I�1=� \\I 1 i CD E ° ° 3 Ill 10 Fi • 1 L ::'" E,:ioc , , (n Qa Lu h J 1 1 1 1I I \1// 1 1 I 1 I III 1 111 1111 Ct iiiamoms Ce 1 N L 5 • A A A 'i� L.... ,C-' E 5,172 g �f' �' 1 s Vit, 1 GR �N— 15'00'00 �D — _, PROJECT AREA - I PLANT 1 cl J .2 ,12 c V-2201 ■ i ki s , V-207 ■ • V-2241 i, ' -''-` `I: V-2271 ■ • V- 19i 0 V-120 • • V-115 0 -"o V PAD ---vr .. - ~ V-03 • • V-2131 c \JN � V-218i ■ • V-100 w V3B11 • ■ V-122 r " ` '. 1. 5 1i ■ V-117 r ,l''.'"V- 6 : V-212 • • V-121 ; ;� i --1V-106 ■ • V-2171 ' .,_— y4 . V-1231 ■ ■ V-205 ':;fti '"-, V-10 5i i ■ V-01 1 . `%4P° V-221i ■ ■ V-223i -A 9,'''''n ` l\ V-2221 • ~ 0, "'° �' { M V-102 • -�-V-229 N u o r `G�j , , i 1 ( ' es V-201 • 0.0m V-107 ■ -J o z V-02 • • V-215i Z VICINITY MAP V-104i • ■ V-204 V-210i ■ ■ V-114 N.T.S. HA V-202 • • V-119 V-214i ■ ■ V-109 ,����‘U"„IIIIi. V-101 ■ ■ V-225i ��� << O F A V-211i ■ • V-113 `� � .,°°.°°,,-.:-Is,' ,9 I��� V-108 ■ ■ V-05 *� \Q'°°°° ° °sTr...., 1* V-203 ■ • V-112 01 =•co...° `) °°° At- am:*0°49 /\ 0,,1a fdp s s efeeeo OA i Richard F. Allison °° °°° ;�,,°° 10608 V—PAD •sio ' TO SPINE ROAD y ssicoh -so ,1401''\-,PPo SURVEYOR'S CERTIFICATE M I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE LEGEND STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY 4- RENAMED CONDUCTOR MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL ■ EXISTING CONDUCTOR DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JANUARY 28, 2012. NOTES: 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. GEODETIC POSITIONS ARE NAD 27. RENAMED CONDUCTOR REVISION NOTE 2. BASIS OF HORIZONTAL AND VERTICAL CONTROL ARE V PAD OPERATOR MONUMENTS. WELL: V-SPARE 3. ELEVATIONS ARE BP MEAN SEA LEVEL. THIS AS-BUILT DRAWING IS A REISSUE OF A 4. PAD AVERAGE SCALE FACTOR IS 0.999909334. PREVIOUS AS-BUILT DRAWING FOR 5. ORIGINAL CONDUCTOR AS-BUILT INFORMATION FOR THIS CONDUCTOR V-SPARE LOCATION WAS INITIALLY PUBLISHED AS CONDUCTOR V-116 RENAMED CONDUCTOR IS AS FOLLOWS: IN 2003. THE CONDUCTOR WAS RENAMED IN 2004 TO OLD COND. NAME NEW COND. NAME V-SPARE, REFERENCE AS-BUILT DRAWING FRB04 WOV 08-00. THE GEODETIC POSITION HAS BEEN REVISED ON V-SPARE V-229 THIS DRAWING. LOCATED WITHIN PROTRACTED SEC. 11, T. 11 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y= 5,969,915.84 N 10,000.44 7019'39.161" 70.3275447' 4,668'FSL V-229 X= 590,587.17 E 4,795.31 149'15'55.245" 149.2653458' 54.0' 1,716'FEL F. Robert DRAWN: „ BARNHART b bull /� CHECKED: „ CHIASSON r� ■ ����it DATE1/28/12 I r_ Y DRAWING: SHEET o FRB12 WOV 01 WOA V PAD assoc. DB NO: RENAMED AS-BUILT CONDUCTOR 1 OF 1 0 1/26 78/12 ISSUED FOR INFORMATION B KC nam AM 1.10s..1MISMI KW MIMEO We SCALE: NO. DATE REVISION BY CHK roAPz AAPA NW 1"=150' WELL: V-229 by 0 V-229(P9b)Proposal Report Schlumberger (Def Plan) Report Data: January 24,2012-03:37 PM Survey/DLS Computation: Minimum Curvature/Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 11.503°(True North) Field: Prudhoe Bay Unit-WOA Vertical Section Origin: 0.000 8,0.000 ft Structure/Slot: V-Pad/Plan V Slot(S-L) TVD Reference Datum: Rotary Table Well: Plan V-229 TVD Reference Elevation: 94.800 ft above MSL Borehole: Plan V-229 Seabed/Ground Elevation: 54.000 ft above MSL UWI I APIA': Unknown/Unknown ) Magnetic Declination: 20.843° Survey Name: V-229(P9b) ) Total Field Strength: 57648.413 nT Survey Date: January 23,2012 Magnetic Dip Angle: 80981° Tort/AHD/DDI/ERD Ratio: 76.121°/3640.221 ft/5.559/0.744 Declination Date: March 21,2012 Coordinate Reference System: NAD27 Alaska State Plane,Zone 04,US Feet Magnetic Declination Model: BGGM 2011 Location Let/Long: N 70°19'39.16116",W 149°15'55.24478" North Reference: True North Location Grid N/E 710: N 5969915.840 ftUS,E 590587.170 ftUS Grid Convergence Used: 0.000° CRS Grid Convergence Angle: 0.69177860° Total Corr Mag North->True North: 20.643° Grid Scale Factor: 0.99990932 Local Coord Referenced To: Well Head Comments MD Mel A=im True TVDSS TVD VSEC NS EW TF DLS Directional Northing Easting (ft) (1 (°) (ft) (ft) (ft) (ft) (ft) (°) (°/1OOft)Difficulty Index (BUS) (ftUS) RTE 0.00 0.00 0.00 -94.80 0.00 0.00 0.00 0.00 OM N/A 0.00 5969915.84 590587.17 150.00 0.00 0.00 5.20 100.00 0.00 0.00 0.00 OM 0.00 0.00 5969915.84 590587.17 200.00 0.00 0.00 105.20 200.00 0.00 0.00 0.00 OM 0.00 0.00 5969915.84 590587.17 KOP Bid 1/100 250.00 0.00 0.00 155.20 250.00 0.00 0.00 0.00 OM 0.00 0.00 5969915.84 590587.17 300.00 0.50 000 205.20 30000 0.21 0.22 0.00 OM 1.00 0.00 5969916.06 590587.17 01 339.80 0.90 0.00 245.00 33980 0.69 0.70 0.00 OM 1.00 0.00 5989916.54 590587.16 400.00 1.50 0.00 305.18 399.98 1.92 1.96 0.00 OM 1.00 0.47 5969917.80 590587.15 Cm 2/100 450.00 2.00 0.00 355.18 449.96 3.42 3.49 0.00 355.56M 1.00 0.84 596991933 590587.13 500.00 2.99 355.56 405.11 499.91 5.53 5.66 -0.10 352M 2.01 1.23 5969921.50 590587.00 600.00 4.99 35200 504.86 599.66 12.13 12.57 -0.91 350.48M 2.01 1.80 5969928.39 590586.11 700.00 7.00 35048 604.31 699.11 21.92 22.88 -2.52 3.77L 2.01 2.21 5969938.68 590584.37 Cry 2/100 750.00 8.00 350.00 653.88 748.68 28.00 29.31 -3.63 HS 2.01 2.38 5969945.10 590583.19 800.00 9.00 350.00 703.34 798.14 34.87 38.59 -4.91 HS 2.00 2.53 5969952.36 590581.82 900.00 11.00 350.00 801.81 896.61 51.03 53.69 -7.93 HS 2.00 2.78 5969969.42 590578.60 Cry 1.5/100 950.00 12.00 350.00 850.81 945.01 60.30 63.50 -9.666 34.211 2.00 2.89 5969979.22 590576.75 SV6 995.23 12.57 351.75 89500 989.80 89.31 73.00 -11.18 32.49R 1.50 2.98 5969988.70 59057511 1000.00 12.63 351.93 899.66 994.46 70.29 74.03 -11.33 32.3211 1.50 2.98 5969989.72 590574.95 1100.00 13.92 355.26 998.98 1091.78 92.13 96.84 -13.88 29.07R 1.50 3.15 5970012.50 590572.15 1200.00 15.25 358.04 1093.76 1188.56 118.47 121.97 -15.30 28.39R 1.50 3.29 5970037.60 590570.40 1300.00 16.60 0.37 1189.92 1284.72 143.27 14940 -15.66 24.14R 1.50 3.42 5970065.02 590569.71 1400.00 17.98 2.36 1285.40 138020 172.53 179.11 -14.93 22.25R 1.50 3.54 5970094.74 590570.08 1500.00 19.38 4.07 1380.13 1474.93 20422 211.08 -13.12 20.63R 1.50 3.64 5970126.73 590571.51 EOCU 1584.98 20.58 5.35 1480.00 1554.80 233.05 240.01 -10.72 19.42R 1.50 3.72 597015568 59057355 1600.00 20.79 5.56 1474.05 1568.85 238.33 245.29 -10.22 19.23R 1.50 3.74 5970160.97 590573.99 SV5 169774 22.18 6.84 158500 1859.80 273.97 280.87 -6.34 18.04R 1.50 3.83 5970196.59 590577.44 1700.00 22.21 6.87 1567.09 1661.89 274.82 281.72 -6.24 18.01R 1.50 3.83 5970197.44 590577.53 1800.00 23.64 8.02 1659.19 1753.99 313.67 32034 -1.18 16.95R 1.50 3.91 5970236.11 590582.12 SV4 183369 24.12 8.38 1690.00 1784.80 32729 333.84 0.78 16.6211 1.50 3.94 5970249.64 590583.90 BPRF 1844.66 24.28 8.50 1700.00 1794.80 331.78 338.29 1.42 16.51R 1.50 3.95 5970254.09 590584.51 End Cry 1894.52 25.00 9.00 1745.32 1840.12 352.54 358.84 4.59 HS 1.50 3.99 5970274.67 590587.42 190000 25.00 9.00 1750.29 1845.09 354.86 381.12 4.95 HS 0.00 3.99 5970276.96 590587.76 Cry 4/100 1944.52 25.00 9.00 1790.64 1885.44 373.65 379.71 7.89 19.23R 0.00 4.01 5970295.58 590590.48 2000.00 27.10 10.80 1840.48 1935.28 398.00 403.71 12.05 17.79R 4.00 4.08 5970319.63 590594.35 2100.00 30.94 12.98 1927.91 2022.71 446.50 451.17 22.02 15.71R 4.00 4.19 5970367.20 590603.74 2200.00 34.80 14.88 2011.89 2106.69 50070 503.82 35.13 14.11R 4.00 429 5970420.00 590618.21 2300.00 38.69 18.44 2092.00 2186.80 560.35 561.40 51.30 12.86R 4.00 438 5970477.77 590631.69 SV3 2310.27 3909 16.58 2100.00 2194.80 588.78 567.58 53.13 12.758 4.00 4.39 5970483.97 590633.44 2400.00 42.60 17.75 2167.87 2262.67 62516 623.64 70.47 11.87R 400 448 5970540.22 590650.10 2500.00 48.52 18.88 2239.11 2333.91 694.81 690.22 92.54 11.06R 400 4.56 5970607.07 590671.36 SV2 2560.78 48.91 19.50 2280.00 2374.80 73937 73268 107.32 10.64R 4_00 4.61 5970849.70 590685.63 2600.00 50.45 19.88 2305.38 2400.18 768.97 760.84 117.40 10.4R 4.00 4.65 5970677.97 590695.36 2700.00 5439 20.76 2366.35 2481.15 847.26 835.13 144.93 9.6611 4.00 473 5970752.58 590721.99 EOC#1(30-S) 2725.48 55.39 20.98 2381.01 2475.81 867.83 854.61 152.35 HS 4.00 4.75 5970772.15 590729.18 2800.00 55.39 2018 2423.33 2518.13 928.32 911.88 174.31 HS 0.00 4.78 5970829.67 590750.44 2900.00 55.39 2018 2480.13 257493 1009.50 988.73 203.77 HS 000 4.82 5970906.86 590778.97 SV1 2952.59 55.39 20.98 2510.00 2604.80 1052.20 1029.14 219.27 HS 0.00 4.84 5970947.46 590793.98 3000.00 55.39 20.98 2536.93 2631.73 1090.69 1065.58 233.24 HS 0.00 4.86 5970984.06 590807.50 3100.00 55.39 20.98 2593.72 2888.52 1171.87 1142.43 262.70 HS 0.00 4.90 5971061.25 590836.04 3200.00 55.39 20.98 2850.52 2745.32 1253.05 1219.28 292.18 HS 0.00 4.93 5971138.44 590864.57 330000 55.39 20.98 2707.32 2802.12 1334.24 1298.13 321.63 HS 0.00 4.96 5971215.64 590893.10 9-58"Cao 3332.02 55.39 2098 272550 2820.30 1360.23 1320.73 331.06 HS 0.00 4.97 5971240.35 590902.23 KOP A'2 333412 55.39 2098 2726.69 2821.49 1381.93 1322.35 331.68 107.64L 0.00 4.97 5971241.98 590902.83 3400.00 54.63 17.90 2764.48 2859.28 1415.38 1373.24 349.64 105.87L 4.00 5.01 5971293.07 590920.18 004 3414.70 54.47 17.20 2773.00 2867.80 1427.28 1384.65 353.25 10547L 4.00 502 5971304.53 590923.65 V-229 uphole tat 3460.89 54.00 15.00 2800.00 2894.80 1464.64 1420.86 383.65 141.56L 4.00 5.04 5971340.65 590933.61 UG4A 3471.06 53.69 14.69 290600 290090 1472.84 142060 365.75 141.371 4.00 5.05 597134662 59093582 3500.00 52.78 13.78 2823.32 2918.12 1498.00 1451.07 371.45 140.831 4.00 5.07 5971371.15 590941.04 3600.00 4972 1047 2885.92 2980.72 1573.95 152728 387.87 138.761 4.00 512 5971447.55 590956.54 End Cot 3674.16 47.52 7.82 2934.94 3029.74 1629.55 1582.21 396.74 HS 400 5.15 5971502.58 590964.74 3700.00 47.52 7.82 2952.39 3047.19 1648.56 1601.09 399.33 HS 0.00 5.16 5971521.48 590967.10 3800.00 47.52 7.82 3019.91 311471 1722.17 1674.16 409.36 HS 0.00 5.18 597159466 590976.25 390000 47.52 7.82 308744 3182.24 1795.77 174723 419.39 HS 0.00 5.20 5971867.84 590985.40 UG3 3992.84 47.52 7.82 3150.00 3244.80 1863.96 1814.92 42668 HS 0.00 5.22 5971735.64 59099387 4000.00 47.52 7.82 3154.97 3249.77 1889.37 1820.30 429.42 HS 0.00 5.22 5971741.02 590994.55 4100.00 47.52 7.82 3222.50 3317.30 1942.98 188337 439.45 HS 0.00 5.24 5971814.20 591003.69 420000 47.52 7.82 3290.03 3384.83 2018.58 1966.44 449.48 HS 0.00 5.25 5971887.38 591012.84 430000 47.52 7.82 3357.55 3452.35 2090.19 2039.51 459.52 HS 0.00 5.27 5971960.56 591021.99 4400.00 47.52 7.82 3425.08 3519.88 2163.79 2112.59 489.55 HS 0.00 5.29 5972033.74 591031.14 4500.00 47.52 7.82 3492.61 3587.41 2237.39 2185.66 479.58 HS 0.00 5.30 5972106.92 591040.28 4600.00 47.52 7.82 3560.14 365494 2311.00 2258.73 489.61 HS 0.00 5.32 597218010 591049.43 4700.00 47.52 7.82 3627.66 3722.48 2384.60 2331.80 499.64 HS 0.00 5.33 5972253.28 591058.58 001 4747.88 47.52 782 3660.00 3754.80 241984 2386.79 504.44 HS 0.00 5.34 5972288.32 591062.96 4800.00 47.52 7.82 3695.19 3789.99 2458.20 2404.87 509.67 HS 0.00 5.35 5972326.46 591067.73 4900.00 47.52 7.82 3762.72 3857.52 2531.81 2477.94 519.70 HS 0.00 5.36 5972399.64 591076.87 5000.00 47.52 7.82 3830.25 3925.05 2605.41 2551.01 529.73 HS 0.00 5.38 5972472.82 591086.02 5100.00 47.52 7.82 3897.78 3992.58 2679.01 262408 539.77 HS 0.00 5.39 5972548.00 591095.17 UG MA 5177.34 4752 7.82 395000 4044.80 273594 2680.59 54752 HS 0.00 540 597260260 591102.24 onII,nu Olra p.5.MOO P.B.Bay Unit-wOv:v.PMW.n v-000Mn v-n6,n9(P9e) 1.2012 212 PM Pape 1 02 Comments (ft) Incl Azim True TVDSS TVD VSEC NS EW TF DLS Directional Northing Easting (ft) (1 (°) (It) (R) (R) (1t) (R) (°) (11o0R)Difficulty Index (RUS) (SUS) 5200.00 47.52 7.82 3985.30 4060.10 2752.62 2697.15 549.80 HS 0.00 5.40 5972819.18 591104.32 UG MB1 5243.97 4752 7.82 3995.00 4089.80 2784.98 2729.28 554.21 HS 0.00 5.41 5972651.38 591108.34 5300.00 47.52 7.82 4032.83 4127.63 2826.22 2770.22 559.83 HS 0.00 5.41 5972692.36 591113.46 UG MB2 534023 47.52 7.82 4080.00 4154.80 2855.83 2799.62 563.86 HS 0.00 542 5972721.80 591117.14 5400.00 47.52 7.82 4100.36 4195.16 2899.83 2843.29 56586 HS 0.00 5.43 5972765.54 591122.61 UG MC 5429.08 47.52 782 412000 4214.80 2921.23 2864.55 572.78 HS 0.00 5.43 5972788.83 591125.27 5500.00 47.52 7.82 4187.89 426269 2973.43 2916.36 579.89 HS 0.00 544 5972838.72 591131.76 SB NA 552534 47.52 7.82 4185.00 4279.80 2992.08 2934.88 58243 HS 0.00 544 5972857.27 591134.08 SB NB 5554.98 47.52 7.82 4205.00 4299.80 3013.88 2956.52 58540 HS 0.00 5.45 5972878.94 591136.78 5600.00 47.52 7.82 4235.42 4330.22 3047.03 2989.44 589.92 HS 0.00 5.45 5972911.90 591140.91 SB NC 5608.79 47.52 7.82 4240.00 4334.80 3052.03 2994.40 590.60 115 0.00 5.45 5972916.87 591141.53 SB NE 5621.80 47.52 782 4250.00 4344.80 3082.93 3005.22 592.09 HS 0.00 5.45 5972527.71 591142.88 Cry4/100 5631.19 47.52 7.82 4256.48 435128 3069.99 3012.23 593.05 118.74R 0.00 5.45 5972934.73 591143.76 5700.00 4625 11.16 4303.51 4398.31 3120.17 3061.76 601.31 116.45R 4.00 5.48 597298435 59115142 SB OA 5758.02 45.25 14.08 4344.00 443880 3161.71 3102.30 810.38 HS 4.00 5.50 5973025.00 591160.00 5800.00 4525 1408 4373.56 4468.36 3191.50 3131.23 617.64 HS 0.00 5.50 5973054.00 591166.91 SB 089 5847.51 45.25 14.08 440700 4501.80 3225.21 3163.95 825.85 HS 0.00 5.51 5973086,62 59117472 5900.00 45.25 14.08 4443.95 4538.75 3282.45 3200.11 63492 HS 0.00 5.51 5973123.09 591183.35 SB 095 5905.75 45.25 14.08 4448.00 454280 3266.53 3204.07 635.92 HS 0.00 551 5973127.08 591184.30 SB OBc 5986.71 45.25 14.08 4505.00 459980 3323.97 3259.84 64991 HS 0.00 552 5973182.99 591197.82 6000.00 4525 14.08 4514.35 4809.15 3333.40 3289.00 852.20 HS 0.00 5.52 597319217 591199.80 SB 08d 6082.00 45.25 14.08 4558.00 4652.80 3377.39 3311.71 882.92 HS 000 5.53 5973235.00 591210.00 6100.00 45.25 14.08 4584.75 4879.55 3404.35 3337.88 869.49 HS 0.00 5.53 5973261.25 591216.25 SB OBe 6150.07 4525 14.08 4620.00 4714.80 3439.87 3372.37 678.14 HS 0.00 554 5973295.84 591224.49 6200.00 45.25 14.08 4855.15 4749.95 3475.30 3406.77 688.77 HS 0.00 554 5973330.34 591232.70 SB OBf 8213.99 45.25 14.08 4665.00 4759.80 3485.22 3416.41 689.19 HS 0.00 554 5973340.00 591235.00 Base08f 6282.17 4525 14.08 4713.00 4807,80 3533.60 3483.37 700.97 HS 0.00 5.55 5973387.10 591246.21 6300.00 45.25 14.08 4725.55 4820.35 3546.25 3475.65 704.05 HS 0.00 5.55 5973399.42 591249.15 6400.00 45.25 14.08 479595 4890.75 3817.19 3544.54 721.34 HS 0.00 556 5973468.50 591265.60 TD 6400.07 45.25 14.08 4796.00 4890.80 3817.24 3544.59ng(( 721.35 9'd 0.00 5.56 5973468.55 591265.61 Lega Surface:466718DFSL 1715.9 FEL 611 711N R11E UM 969915.8405E.717, v-229 uphola tat:808 FSL 1351 FEL 2 T11N R11EUM 5971340.850 590933.610 BHL:2932 FSL 991 FEL 2 T11 N R11EUM 5973468.550 591265.610 • • • Drilling Office 2511000 Pruawe Bay Una wonrvPeMien v2291PoenVz9.Vn9(P9n1 1/25201220PM Peq 2>2 Project: Prudhoe Bay Site: PB V Pad Under Consolidation From Colour To MD Well: Plan V-229 Wellbore: Plan V-229 Design: Plan #9 V-299 41 500 500 1000 1000 1500 1500 2000 2000 2500 From 9-5/8in Casing Point to TD Scan interval 25 ft 2500 3000 Scale 1 : 50 3000 4000 All wells pass major risk 0 4000 5000 V-123/V-123 - . -- ,.''..'•, it`l. 14 5000 6375 330 ``►.A'2r ``''"` ,��\�N 30 . 4111.111 / _/•• \ 1 Aht i% .I��arri-s 41. ,,,' .-- ,..., .....i: Ar ifFivir4441siii. ....7•?..1.N.1.1.7x04.44,P, ✓ • r err=9r,s' %/ - �—�— 300 a��\ • , / / `� �� 60 1+" - '\ •rrrrr*'.� tri 90 , Mr \ 5 \ ,"\ \ \ \\ \ \\ / \ \ . , ,.._ _ , z,.///// , / // / // \ \ \ `\ 7 , / / y 240 \\ \Y s _ � — -- --- ; /� 120 k100 i.... 210 ��� 150 180 Travelling Cylinder Azimuth (TFO+AZI)[0] vs Centre to Centre Separation [50 ft/in] Project: Prudhoe Bay Site: PB V Pad Under Consolidation From Colour To MD Well: Plan V-229 Wellbore Plan V-229 Design: Plan #9 V-299 41 500 500 1000 1000 1500 1500 2000 From RTE to 9-518in Casing Point 2000 2500 Scan interval 25 ft 2500 3000 Scale 1 : 50 3000 4000 All wells pass major risk 0 4000 5000 "'�,.$----y - y5000 6375 pg -4.K. 4 330 Y"" f':-...,.1 ,'-'.7- •'r r. -79—',.-.•-'...":7, ' `-.. -106/V-106 ',lir ek i...-..,.-::.,..„:._14. •, \ 414..' .401...._44*, 72r �1 91�i �N. `hyi;', ,...7474‘..........yrd,,N.....11P4T., / ,',".= . • *11411A;e4<-:::.'.4,e'44:4Nlimen....,..., ."'"-...-A,411,04 ii,, i gi./46,;''' ''''''s-----___ _. -------",:,- 300 ' • 9 t- r-,.� ?tc �`1411N,t ,iO„,.. It — 60 .e.1U�104 �. ,�r�►'"��� � iii�.:,,,tr.:7444111:r•.:, � , 1222 , .;065, :^'� `!0 �:�r:���`_ '?' � -Z 1034 247 r/ b;,.04. _ _ " ', � �+. -�:i 7 1055 1 1 44, z - 272 f'it yr, 1 � 1034 1294 � -.011000 r 956.N � �/ 1 903 1321`' !3J " 3 y.9- 50 �111dt5q v^0 r \ 118II I I \ I j�o7 4a ,, 1w- r 32 a -�-2+� • 1 1. ' t r 't 11,-,'i3 118 1 1' lik ., 1281.. sh .z 7 b!`-77.114616,-sr �y 1 , 'YB- 4.04f ili•3 - ;,7 , :x, i /S�°i fi:; ,V-121;v-12 I ,C2.5 t 8r , .- 201 {tf SN-,23 ri 11 v- v V-104,'V-104 ` 27 125 y;F:c t " ' , 1' 6 835 �'' ,�z 1225 .1 a• 270 -- ' PF _ 3-- — • }�_� 90 1 t 139, 1• -1 t � 1 t ! 11,1V; 1: i Z5 7d t$, 1514 1� ` 2•}7,� i t1�5 7,T.'.20A_.' 234 LS t• 1 t,3iF; 310 80e 79/9537 739 ` -\t rt rr i; 15:14A`' 34 83, 99 289'. 3 :, t . -1$`r 11' . Y 15 y f58 8$1 /Th000 857 �,'p�561 755 1 . ;„,,..v.".....• ”p- ' -. \ 1 G9' 155 31 754 ' 778 9:69 � 80 616 2 953 /25 X 11P f 676 97 11631 L. 2813,. 7"s2 818 8 V-228(S 1� rkt?n 1 .�� tt! rfOU ,_2 <.v G �:,v ttf:. )l ..3./ X63 756 841 / 1 Za 911354 8466 Pi,-"` !< $, -: , 'fi'`r` 1' F \. ?/9 �865 1749/ SOdS 10.5 7 �/ 1773 167 88$8 gg .4 , \•..'" '''. - ''' 4 826 912 42 ;4. .1 1017�iG $Q � , s8 240'.-1's / '52 .8N :.g '`,9W",-;:-.-17--- 1:70-",-..‘ 466 94t 913 120 872 101 -' �_ 1 / 967 4 V-217N-217 1 ,li `� �I ���` i 7?� 1 ti11�'�"<•-7 894 � � -,::),:•'• 8913 (111� 'N.-')124111442."_ 'qc 1 4h7, 0 �%•.n a,• •.. .0.,,,..%).. \\. 512U,'Wll13 �� .1 rr-rt_q_ • I�aK J c�. °4 V 225 8^ x1042 .moi i'•r. ! �L�f'4 s '\ '' ._,84 7°v X51036/ , , ,4t •���,..aj.i� x•4,1 \ /4532188 3 , � , c. 1065 .i:ilii' ��`~c 7�': f V-223N-223 ,� , X26 �I2X 4SSitipokii.II:u. s�:'.,.���. .1,4!x' /`.-.. ��\�y� xt�+ Z � '. 6+V-205N-205L2 \,..1 0y . " ` `a\ � :a i45' 21u teilt `•t tit�ar�Olf,/, V-111N-111PB3 f,•'* �. GLS .41. t-- .` czgh l -.74.4.4,/..,....41 t.. -_ V-226(SL)/Pbn#4 V-226 — 18 '._1i z1 N-215 Travelling Cylinder Azimuth (TFO+AZI)[i']vs Centre to Centre Separation[50 Win] North America - ALASKA - BP Prudhoe Bay PB V Pad Under Consolidation Plan V-229 Plan V-229 Plan #9 V-299 Anticollision Summary Report 23 January, 2012 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-229 Project: Prudhoe Bay TVD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Reference Site: PB V Pad_Under Consolidation MD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Site Error: 0.00ft North Reference: True Reference Well: Plan V-229 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V-229 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#9 V-299 Offset ND Reference: Offset Datum Reference Plan#9 V-299 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 835.93ft Error Surface: Elliptical Conic Survey Tool Program Date 1/23/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 40.80 1,500.00 Plan#9 V-299(Plan V-229) GYD-GC-SS Gyrodata gyro single shots 1,500.00 3,000.00 Plan#9 V-299(Plan V-229) MWD MWD-Standard 1,500.00 3,332.00 Plan#9 V-299(Plan V-229) MWD+IFR+MS MWD+IFR+Multi Station 3,332.00 4,800.00 Plan#9 V-299(Plan V-229) MWD MWD-Standard 3,332.00 6,400.07 Plan#9 V-299(Plan V-229) MWD+IFR+MS MWD+IFR+Multi Station 1/23/2012 2:14:12PM Page 2 of 6 COMPASS 200316 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-229 Project: Prudhoe Bay TVD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Reference Site: PB V Pad_Under Consolidation MD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Site Error: 0.00ft North Reference: True Reference Well: Plan V-229 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V-229 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#9 V-299 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB V Pad_Under Consolidation Plan V-206(slot V-229)-Plan V-206-Plan#2 V 464.48 450.00 265.73 8.70 257.03 Pass-Major Risk Plan V-226(SL)-Plan V-226-Plan#4 V-226 474.71 475.00 17.03 8.77 8.26 Pass-Major Risk Plan V-228(S-S)-Plan V-228-Plan#2 V-228 537.62 525.00 145.36 9.90 135.49 Pass-Major Risk V-01-V-01-V-01 487.05 475.00 70.20 8.60 61.61 Pass-Major Risk V-01_DIMS-V-01-V-01 94.80 94.80 69.79 1.57 68.22 Pass-Major Risk V-02-V-02-V-02 1,143.55 1,125.00 78.30 19.45 58.86 Pass-Major Risk V-02_DO NOT USE-V-02-V-02 1,143.55 1,125.00 78.30 19.45 58.86 Pass-Major Risk V-03-V-03-V-03 1,615.33 1,575.00 180.14 25.65 154.56 Pass-Major Risk V-04-V-04-V-04 1,253.67 1,200.00 143A7 22.86 121.32 Pass-Major Risk V-05-V-05-V-05 238.59 225.00 151.91 4.29 147.62 Pass-Major Risk V-05_DIMS-V-05-V-05 94.80 94.80 150.09 1.57 148.52 Pass-Major Risk V-07-V-07-V-07 1,030.91 975.00 185.36 18.76 167.06 Pass-Major Risk V-100-V-100-V-100 734.65 725.00 188.08 11.59 176.56 Pass-Major Risk V-100_DIMS-V-100-V-100 94.80 94.80 189.77 1.57 188.20 Pass-Major Risk V-101-V-101-V-101 1,168.35 1,125.00 194.92 19.21 176.06 Pass-Major Risk V-102-V-102-V-102 1,102.81 1,050.00 164.70 20.45 145.16 Pass-Major Risk V-103-V-103-V-103 71139 675.00 235.25 12.25 223.02 Pass-Major Risk V-104-V-104-V-104 1,237.20 1,200.00 132.23 21.23 111.08 Pass-Major Risk V-104_DIMS-V-104-V-104 94.80 94.80 189.20 1.57 187.63 Pass-Major Risk V-105-V-105-V-105 1,405.57 1,375.00 52.09 22.19 29.91 Pass-Major Risk V-105_DIMS-V-105-V-105 94.80 94.80 192.57 1.57 191.00 Pass-Major Risk V-106-V-106-V-106 3,386.41 3,175.00 189.88 77.06 135.10 Pass-Major Risk V-106-V-106A-V-106A 4,692.90 4,450.00 239.20 116.61 124.07 Pass-Major Risk V-106-V-106APBi-V-106APB1 4,692.90 4,450.00 239.20 116.64 124.05 Pass-Major Risk V-106-V-106APB2-V-106APB2 4,692.90 4,450.00 239.20 116.61 124.07 Pass-Major Risk V-106-V-106APB3-V-106APB3 4,692.90 4,450.00 239.20 116.62 124.07 Pass-Major Risk V-107-V-107-V-107 1,225.17 1,200.00 54.51 20.35 34.17 Pass-Major Risk V-107 DIMS-V-107-V-107 94.80 94.80 181.90 1.57 180.33 Pass-Major Risk V-108-V-108-V-108 706.53 675.00 239.95 12.26 227.75 Pass-Major Risk V-109-V-109-V-109 785.80 775.00 110.72 12.51 98.24 Pass-Major Risk V-109-V-109PB1-V-109PB1 785.80 775.00 110.72 12.51 98.24 Pass-Major Risk V-109-V-109PB2-V-109PB2 785.80 775.00 110.72 12.51 98.24 Pass-Major Risk V-109_DIMS-V-109-V-109 94.80 94.80 105.31 1.57 103.75 Pass-Major Risk V-111-V-111-V-111 1,607.60 1,575.00 128.49 26.12 102.55 Pass-Major Risk V-111-V-111PB1-V-111PB1 1,607.60 1,575.00 128.49 26.12 102.55 Pass-Major Risk V-111-V-111PB2-V-111PB2 1,607.60 1,575.00 128.49 26.12 102.55 Pass-Major Risk V-111-V-111PB3-V-111PB3 1,607.60 1,575.00 128.49 26.12 102.55 Pass-Major Risk V-112-V-112-V-112 337.61 325.00 166.80 7.20 159.60 Pass-Major Risk V-112DIMS-V-112-V-112i 94.80 94.80 165.31 1.57 163.74 Pass-Major Risk V-113-_V-113-V-113 436.63 425.00 137.61 6.81 130.82 Pass-Major Risk V-113 DIMS-V-113-V-113 94.80 94.80 135.09 1.57 133.52 Pass-Major Risk V-114-V-114-V-114 337.65 325.00 76.38 5.66 70.72 Pass-Major Risk V-114-V-114A-V-114A 337.65 325.00 76.38 5.66 70.72 Pass-Major Risk V-114-V-114APB1-V-114APB1 337.65 325.00 76.38 5.66 70.72 Pass-Major Risk V-114-V-114APB2-V-114APB2 337.65 325.00 7638 5.66 70.72 Pass-Major Risk V-114 DIMS-V-114-V-114 94.80 94.80 75.07 1.57 73.50 Pass-Major Risk V-114__DIMS-V-114A-V-114A 94.80 94.80 75.07 1.57 73.50 Pass-Major Risk V-115-V-115-V-115 363.36 350.00 222.26 5.95 216.32 Pass-Major Risk V-115-V-115L1-V-115L1 363.36 350.00 22226 5.95 216.32 Pass-Major Risk V-115-V-115L2-V-115L2 363.36 350.00 22226 5.95 216.32 Pass-Major Risk V-115-V-115L2PB1-V-115L2PB1 363.36 350.00 22226 5.95 216.32 Pass-Major Risk V-115-V-115PB1-V-115PB1 363.36 350.00 22226 5.95 216.32 Pass-Major Risk V-117-V-117-V-117 411.96 400.00 158.98 7.04 151.96 Pass-Major Risk 1/23/2012 2 14:12PM Page 3 of 6 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-229 Project: Prudhoe Bay TVD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Reference Site: PB V Pad_Under Consolidation MD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Site Error: 0.00ft North Reference: True Reference Well: Plan V-229 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V-229 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#9 V-299 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well•Wellbore•Design (ft) (ft) (ft) (ft) PB V Pad_Under Consolidation V-117-V-117PB1-V-117PB1 411.96 400.00 158.98 7.04 151.96 Pass-Major Risk V-117-V-117PB2-V-117PB2 411.96 400.00 158.98 7.04 151.96 Pass-Major Risk V-117_DIMS-V-117-V-117 94.80 94.80 159.79 1.57 158.22 Pass-Major Risk V-119-V-119-V-119 661.48 650.00 93.64 11.48 82.16 Pass-Major Risk V-119_DIMS-V-119-V-119 94.80 94.80 90.19 1.57 88.62 Pass-Major Risk V-119_DIMS-V-119-V-119 94.80 94.80 90.19 1.57 88.62 Pass-Major Risk V-121-V-121-V-121 586.69 575.00 125.77 11.01 114.77 Pass-Major Risk V-122-V-122-V-122 312.42 300.00 176.36 5.39 170.97 Pass-Major Risk V-122-V-122PB1-V-122PB1 312.42 300.00 176.36 5.39 170.97 Pass-Major Risk V-122-V-122PB2-V-122PB2 312.42 300.00 176.36 5.39 170.97 Pass-Major Risk V-123-V-123-V-123 3,671.55 3,475.00 135.61 88.48 59.32 Pass-Major Risk V-201-V-201-V-201 1,072.86 1,025.00 167.92 18.56 149.69 Pass-Major Risk V-201_DIMS-V-201-V-201 94.80 94.80 180.04 1.57 178.47 Pass-Major Risk V-201_DIMS-V-201-V-201 94.80 94.80 180.04 1.57 178.47 Pass-Major Risk V-202-V-202-V-202 1,348.92 1,325.00 113.49 22.93 90.56 Pass-Major Risk V-202-V-202L1-V-202L1 1,348.92 1,325.00 113.49 22.93 90.56 Pass-Major Risk V-202-V-202L2-V-202L2 1,348.92 1,325.00 113.49 22.93 90.56 Pass-Major Risk V-203-V-203-V-203 983.96 950.00 213.02 17.43 195.67 Pass-Major Risk V-203-V-203L1 -V-203L1 983.96 950.00 213.02 17.43 195.67 Pass-Major Risk V-203-V-203L2-V-203L2 983.96 950.00 213.02 17.43 195.67 Pass-Major Risk V-203-V-203L3-V-203L3 983.96 950.00 213.02 17.43 195.67 Pass-Major Risk V-203-V-203L4-V-203L4 983.96 950.00 213.02 17.43 195.67 Pass-Major Risk V-204-V-204-V-204 663.26 650.00 63.76 11.80 51.98 Pass-Major Risk V-204-V-204L1 -V-204L1 663.26 650.00 63.76 11.80 51.98 Pass-Major Risk V-204-V-204L1 PB1-V-204L1 PB1 663.26 650.00 63.76 11.75 52.03 Pass-Major Risk V-204-V-204L2-V-204L2 663.26 650.00 63.76 11.80 51.98 Pass-Major Risk V-204-V-204L2PB1-V-204L2PB1 663.26 650.00 63.76 11.75 52.03 Pass-Major Risk V-204-V-204L3-V-204L3 663.26 650.00 63.76 11.75 52.03 Pass-Major Risk V-204-V-204PB1-V-204PB1 663.26 650.00 63.76 11.75 52.03 Pass-Major Risk V-204-V-204PB2-V-204PB2 663.26 650.00 63.76 11.75 52.03 Pass-Major Risk V-204_DIMS-V-204-V-204 94.80 94.80 60.33 1.57 58.76 Pass-Major Risk V-204_DIMS-V-204L1-V-204 L1 94.80 94.80 60.33 1.57 58.76 Pass-Major Risk V-204_DIMS-V-204L2-V-204 L2 94.80 94.80 60.33 1.57 58.76 Pass-Major Risk V-204_DIMS-V-204L3-V-204 L3 94.80 94.80 60.33 1.57 58.76 Pass-Major Risk V-205-V-205-V-205 710.84 700.00 98.31 12.18 86.13 Pass-Major Risk V-205-V-205L1-V-205L1 710.84 700.00 98.31 12.18 86.13 Pass-Major Risk V-205-V-205L2-V-205L2 710.84 700.00 98.31 12.18 86.13 Pass-Major Risk V-205_DIMS-V-205-V-205 94.80 94.80 99.68 1.57 98.11 Pass-Major Risk V-205_DIMS-V-205L1-V-205L1 (OBa) 94.80 94.80 99.68 1.57 98.11 Pass-Major Risk V-205_DIMS-V-205L2-V-205L2(OA) 94.80 94.80 99.68 1.57 98.11 Pass-Major Risk V-210-V-210-V-210 238.69 225.00 195.36 4.06 191.30 Pass-Major Risk V-210_DIMS-V-210-V-210 94.80 94.80 194.17 1.57 192.61 Pass-Major Risk V-211-V-211-V-211 238.90 225.00 225.74 3.99 221.75 Pass-Major Risk V-212-V-212-V-212 1,028.98 975.00 215.53 17.99 197.79 Pass-Major Risk V-213-V-213-V-213 538.82 525.00 209.09 9.83 199.27 Pass-Major Risk V-213-V-213PB1-V-213PB1 538.82 525.00 209.09 9.83 199.27 Pass-Major Risk V-213_DIMS-V-213-V-213 94.80 94.80 159.79 1.57 158.22 Pass-Major Risk V-213_DIMS-V-213PB1-V-213PB1 94.80 94.80 159.79 1.57 158.22 Pass-Major Risk V-214-V-214-V-214 843.40 800.00 213.38 15.01 198.50 Pass-Major Risk V-214-V-214PB1-V-214PB1 1,058.26 1,006.00 179.82 22.61 157.47 Pass-Major Risk V-214-V-214PB2-V-214PB2 819.71 775.00 213.00 14.61 198.50 Pass-Major Risk V-214-V-214PB3-V-214PB3 819.71 775.00 213.00 14.61 198.50 Pass-Major Risk V-214-V-214PB4-V-214PB4 819.71 775.00 213.00 14.61 198.50 Pass-Major Risk 1/23/2012 2:14:12PM Page 4 of 6 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-229 Project: Prudhoe Bay TVD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Reference Site: PB V Pad_Under Consolidation MD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Site Error: 0.00ft North Reference: True Reference Well: Plan V-229 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V-229 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#9 V-299 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB V Pad_Under Consolidation V-215-V-215-V-215 561.97 550.00 43.52 11.90 31.62 Pass-Major Risk V-216-V-216-V-216 213.19 200.00 242.27 3.79 238.48 Pass-Major Risk V-217-V-217-V-217 512.45 500.00 113.66 8.60 105.08 Pass-Major Risk V-217_DIMS-V-217-V-217 94.80 94.80 114.57 1.57 113.00 Pass-Major Risk V-219-V-219-V-219 288.17 275.00 235.19 4.80 230.40 Pass-Major Risk V-221-V-221-V-221 366.99 350.00 189.09 6.51 182.59 Pass-Major Risk V-221_DIMS-V-221-V-221i 94.80 94.80 187.69 1.57 186.12 Pass-Major Risk V-222-V-222-V-222 2,742.64 2,600.00 112.59 66.79 46.36 Pass-Major Risk V-223-V-223-V-223 538.11 525.00 55.71 11.44 44.27 Pass-Major Risk V-223_DIMS-V-223-V-223 94.80 94.80 54.67 1.57 53.10 Pass-Major Risk V-225-V-225-Plan#4 V-225 612.03 600.00 123.45 11.31 112.14 Pass-Major Risk V-225-V-225-V-225 537.72 525.00 123.98 8.89 115.11 Pass-Major Risk V-227-V-227-V-227 976.40 925.00 301.40 17.36 284.18 Pass-Major Risk 1/23/2012 2:14:12PM Page 5 of 6 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan V-229 Project: Prudhoe Bay TVD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Reference Site: PB V Pad Under Consolidation MD Reference: V-229 D25 Plan @ 94.80ft(D25(40.8'RTE+54'GL)) Site Error: 0.00ft North Reference: True Reference Well: Plan V-229 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan V-229 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#9 V-299 Offset TVD Reference: Offset Datum Reference Depths are relative to V-229 D25 Plan @ 94.80ft(D25 Coordinates are relative to:Plan V-229 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is:0.69° Ladder Plot I I _ 1 -. 1 _ r-- 1000 I 1 I I I I I I I I I I I I I 1 I 1 I I -1_ _ __ _ _ __J_ J -I J _ -__ J_ I I I I I I 11f ( + 4 { I I I C .i'' . I .... I 750 0' 9' =� - t p 1 y.• 0 1 ► I L(7 1 i � II./1 �.i I .4�'1 I -- I I I cn 500i ,- r )„ --.Mr w I l I --- . :. i1 I'S I I I 0 I arV-21 (siotV.22a),Plan V406,•i• ; 4.'',�. , '' ...... ;,3_OMS,\.4113,V-11 -f+' V204,V104L3,V211413V4 ar V2V(SL),Plar V110,1'Iah 041 44,' .•• { f 4,V t14.1-114 V5- ' - -- J --n -V-2B4'V/'264PB1-'v 64PB1•V*-•(S•S).PIanV228.P1bn + ,' .... 4,V•114APd114' '' -•@.4 V204,V-204PB2,V104PB2V2 1 + 1 1 .01,V0EVO1 V15 • � y f-..:' „. • • ,R t I1144P81' • 7^`4. V204_OMS,V2041V204V0 O'_Da� ^��rt .V°U1"v-,_ AC '..moi I V204_D S.V2041..1,V204L VD r -02.'02,'02'12 �i 1 . r 1• -$r V204_13MS.V2041.2,V2D4L:V0 •01_DO NOT USE. ..i ►.t/� r _= .♦ . .•_.. .. • _R _4AV0 J_ �' V204_ S.V-204J.3.V204 'vD -0:,V-03,V-03 V7 -p.p. 1- V1 5,V115,.1-115 V5 I - V205,V205,V206Vt4 e,', _�' • 1 1 I 1 1 •04,V-04,V-04 V7 I -9-• V1 5,V115L11,V115L1 V2 I -04. V205,V205L1.V205L1 V9 •05,V05,V05g13 ,$ V1 5 V115L3 V11512'4 . '205 V2051_2'2[1512'8 .0!_DMS,V05,V65V0 1500 -0- \ ,10v115L2P81,V•1d, B1 V"5 6000 -6- V2057EbehS,V205,V2051000 07,'07,'07'15 '115'V11ea5urea f__?elm(1500tttin) -fg- V205_0MS,V-205L1,V205L1(OBa)V0 -100,V-100,V-100 VT V117.V117,V-117 V9 —0— V205_DMS,V205L2.V•205L2(OA)VD •109 arors,barut,,ar00-v0 -0- v-117,vtiI7PBI,v-117PB1 v0- •-0- V-210,v-210.V2I0V9 •101,V-101,V•101 V9 $• V117,V117PB2,V•117PB2VB $ V210_DMS,V210,V.210V1) -102,V102,V102V5 -3.'- V117_OMS,V117,V-117'17 •-)(- V211,V•211,V211 V5 •103,V103,V103V6 -40- V119,V-119,V119V15 -1E- V212.V212,V212V7 •104,V104V104V13 —6- V119_OMS,V119V-119'0 ` V213,V•213.V213V5 104 DMS,V104,V-104V0 -4- V119_OMS,V119,V-119vU -e- V213,V-213PB1,V213PB1V5 .105,V105.V105V13 1, V121.V121,V-121 V5 -0- V213_DMS.V213,V213V0 •105 0MS,V105,V-105'0 -4- V122,V-122,V122 V10 -44- V213_0MS,V213PB1,V213PB1 VO •106,V106,V106 V10 $ V122,V122P01,V-122P81 V10 T V214,V•214,V214V3 •106,V106A.V106AVO -$- V122,V122PB2,V122PB2V7 -A- V214,V-214P 81.V214PB1 V2 10B,V106APB1,V106APB1W -f V.123,V123,V•123VD -6- V214,V•214PB2,V214PB2V3 1/23/2012 2:14:12PM Page 6 of 6 COMPASS 2003.16 Build 73 ., TREE=- 4-1/16"CM/ SAFI IOTES:***BOT PREMIER PACKERS ARE CUT-TO- D ACTUATA R= FMC RELEAQc DESIGNS. THE 2 i Proposed WINDOW.BOT PKR PRESSURE RATT ING=75 0 PSI.S A 7"ACTUATOR= Electric - KB.ELEV= 94.8 EXCEED 4,000 PSI.*** KOP=_� 300' 4.5"X 3.5"XO,ID=2.992" —124'I) -__ L J I Max A Angle D= 55 deg 20"CONDUCTOR —I 108' ' ' 2796' I—3-1/2"HES X NIP,ID=2.813" DDatum TVD= 9-5/8"CSG,40#, L-80 BTC, ID=8.835" —1 3332' ST MD TVD DEV TYPE VLV LATCH PORT DATE 10 MIG DCR RK 0 WATER INJECTION MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE / 9 8 MMG-W RD RK 0 MMG-W RD RK 0 Minimum ID = 2.75" @ 6172' / 7 MMG-W RD RK 0 3-1/2" HES XN NIPPLE �I ' 6 MMG-W RD RK 0 5 MMG-W RD RK 0 4 MMG-W RD RK 0 3 MMG-W RD RK 0 3-1/2"RA PIP TAG I— 5712' 2 MMG-W RD RK 0 1 MMG-W RD RK 0 7"X 3-1/2"BOT PREMIER FEEDTHRU PKR,ID=2.90" —I 5704' 17'MARKER JOINT w/RA PIP TAG I— 5762' * I I 5717' I-13-1/2"HES X NIP,ID=2.813" 3-1/2"NDPG MULTI-DROP SUB,ID=2.992" -1 5723' I II 5808' —17"BOT PREMIER FFFDTHRU PKR,ID=2.90" ' , - 5820' 13-1/2"HES X NIP,ID=2.813" I— — 5826' —13-1/2"NDPG MULTI-DROP SUB,ID=2.992 L 5890' 1T BOT PREMIER FFFDTHRU PKR, ID=2.90" I I - — 5903' 13-1/2"HES X NIP,ID=2.813" ■" 5904' —13-1/2"NDPG MULTI-DROP SUB,ID=2.992 IIIIIIIIIIL� PERFORATION SUMMARY _ 5950' I---17"BOT PREMIER FEEDTHRU PKR,ID=2.90" I I I 5963' 13-1/2"HES X NIP,ID=2.813" SIZE SPF ZONE INTERVAL Opn/Sqz DATE 1- 5964' ,-13-1/2"NDPG MULTI-DROP SUB, ID=2.992 11 4-1/2" 5 OA 4-1/2" 5 OBa6028' I7"BOT PREMIER FEEDTHRU PKR, ID=2.90" I 4-1/2" 5 OBb 4-1/2" 5 OBc 641'0 13-1/2"HES X NIP,ID=2.813" • 4-1/2" 5 OBd — 6047' —3-1/2"NDPG SINGLE SUB,ID=2.992 ' '--- 6151' 113-1/2"HES X NIP,ID=2.813" I ' _ 6172' —13-1/2"HES XN NIP, ID=2.750" 3-1/2"TBG,9.2#, L-80 TCII, .0087 bpf, ID=2.992" H 6195' I 6195' I—3-1/2"WLEG, ID=2.905" PBTD H 6320' 111111111♦ 7'CSG,26#,L-80 VT HC, .0383 bpf, ID=6.276" —1 6400' 1.1.1�1.1.1.1.1.1�1�1 DATE REV BY COMMENTS DATE REV BY COMMENTS ORION UNIT 06/08/11 GJS PROPOSED COMPLETION WELL: V-229i _ PERMIT No: # API No: SEC 11,T11 N,R11 E,4667'FSL&1715'FEL BP Exploration(Alaska) Page 1 of 2 e Schwartz, Guy L (DOA) From: Ciolkosz, Ryan R [Ryan.Ciolkosz@bp.com] Sent: Wednesday, February 15, 2012 7:45 AM To: Schwartz, Guy L (DOA) Subject: RE: V-229i (PTD 212-016) Attachments: V-229 Area of Review Revised.doc AOR with TOC TVD. Ryan Ciolkosz Drilling Engineer BP Exploration Alaska Office: (907)564-5977 Cell: (907)244-4357 From: Schwartz, Guy L(DOA) [mailto:guy.schwartz@alaska.gov] Sent: Tuesday, February 14, 2012 4:33 PM To: Ciolkosz, Ryan R Subject: RE: V-2291 (PTD 212-016) Thanks... that would be great if you send the TVD too. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Ciolkosz, Ryan R [mailto:Ryan.Ciolkosz@bp.com] Sent: Tuesday, February 14, 2012 3:22 PM To: Schwartz, Guy L(DOA) Subject: RE: V-229i (PTD 212-016) Guy, Initial BOPE ram configuration from Top to Bottom: - Annular Preventer - 2-7/8" X 5-1/2"Variable rams - Blind/shear Rams - Flow cross - 2-7/8 x 5-1/2"Variable rams We will be changing out the top set of rams to 7" rams prior to running 7" casing. I will make sure I put TVD's in future PTD and pass that along to others. Do you need me to send you the TVD's for those cement tops? Thank you, Ryan Ciolkosz Drilling Engineer BP Exploration Alaska 2/15/2012 Page 2 of 2 Office: (907)564-5977 Cell: (907)244-4357 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Tuesday, February 14, 2012 11:44 AM To: Ciolkosz, Ryan R Subject: V-229i (PTD 212-016) Ryan, In reviewing the PTD I cant' figure out your initial BOP ram configuration. What size ramsNBRs are planned for the first BOP test? You don't mention changing rams out for running the 7" casing. Good job on the AOR.. but on some of the cement tops on Kuparuk completions it would be better to state TOC as ND depth also so I know the Schader is isolated. ( ie V-123&V-106) Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 2/15/2012 by V-229 Area of Review V-229 is a Schrader injection well targeting OA, OBa, OBb, OBc, OBd sands. The following six wellbores are within 1/4 mile of the planned V-229 wellbore within the Schrader formation. The primary cement jobs for each wellbore and current well status are provided. 1) V-105 a) 600 ft from V-229 in Schrader reservoir b) Well Status: Miscible Injector. Currently injecting. c) Production Casing: 7", 26#, L-80 set at 8,243 ft MD, 7,123 TVD. ES cementer at 6011' MD/4907' TVDss i) 1st stage 35 bbls 15.8 ppg lead. Bond Log shows top of cement at 4406' MD/3575' TVDss ii) 2nd stage 69 bbls 15.6 ppg lead. Bond Log shows top of cement at 7350' MD/6162' TVDss 2) V-123 a) 600 ft from V-229 in Schrader reservoir b) Well Status: Water Injector in the Kupaurk formation. Currently injecting c) Intermediate Casing: 7" 26# L-80 top set in the Kuparuk at 9759 ft MD/6717' TVD. i) 287 bbls 11.5 ppg lead and 66 bbls 15.8 ppg tail cement. Estimated TOC 3400' MD/2812 TVDss d) Production Liner: 3-1/2" 9.2# L-80 set at 11759' MD i) 74 bbls 15.8 ppg class G. Estimated TOC from CBL: 10,420 MD/6656' TVDss 3) V-106A a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Kuparuk Oil producer. Currently producing c) Intermediate Casing: 7" 26#top set at 9407 ft MD/6656' TVD. i) 137 bbls 12.5 ppg lead and 38 bbls 15.8 ppg tail cement. Estimated TOC: 4454' MD/3588' TVDss d) Production Liner: 4-1/2" 12.6# L-80 set at 13228' MD i) 104 bbls 15.8 ppg lead. 20 bbls contaminated cement circulated off top of liner at 8710' MD/6507' TVD. 4) V-204 (L1,L2,L3) - Multi-lateral with 4 laterals in the Schrader a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Schrader Oil producer. Currently producing c) Intermediate Casing: 7-5/8" 29.7#top set at 5408 ft MD/4638' TVD. i) 101 bbls 15.8 ppg Class G lead. Estimated TOC: 3377' MD/3169' TVDss d) Production Liner: 4-1/2" 12.6# L-80 Slotted Liner in the OA, OBa, OBb and OBd 5) V-202 (L1,L2) - Multi-lateral with 3 laterals in the Schrader a) 1170 ft from V-229 in Schrader reservoir b) Well Status: Schrader Oil producer. Currently producing c) Intermediate Casing: 7-5/8" 29.7#top set at 5966 ft MD/4638' TVD. i) 94.7 bbls 15.6 ppg Class G lead. Estimated TOC: 3589' MD/3305' TVDss d) Production Liner: 4-1/2" 12.6# L-80 Slotted Liner in the OA, OBa, and OBd 6) V-216 a) 1070 ft from V-229 in Schrader reservoir b) Well Status: Water Injector in the Schrader formation. Currently injecting c) Production Casing: 7" 26/44 L-80 set at 6801' MD/4908' TVD i) 66 bbls 15.8 ppg class G. Estimated TOC from CBL: 4,513 MD/3241' TVDss OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME 7 ' / /d '9 PTD# a?4? 0/6 Development / Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: 7 4%C ,4'4 2:4), POOL: <,e>, .�-e4e," Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 n "a o I- -o c Q n -0 3 0 ml n cn , 0 co 5 co v 3• xt r O 3n << 0 N _ r (D 3. O Ni N 7 N a) O m N.co c0 0 A 0 (0 co O ° m A O O N d N_ g N ci)w . O c 0 O 0 O. (D Ni N N -I W W W CO W W W W W W Ni Ni Ni Ni Ni Ni Ni Ni Ni Ni CO CO -,1 O) 01 A W Ni -� O i (O CO �l O) CD A W N -, 0 CO CO -I O) 01 A W N - 0 CO CO 0) 01 A W N -, 0 v m n 0) 0) p m (, * n W 03 p = D '=,- D n n n n cn n 'o D * n m m O O * * * C I- -0 Z , n (D °) CD (D ? 0 0 _ n n v n 0) c o = 0) CD (D ° ° n c Z. m m o U' v C) 0 ° v - <' 0 0 v_ -1 -1 -1 3- ° . F m ° m CD m m m (D a m ° co r m v 3 (D < 0 a al _o 5 m n -0 3 3 < c 0 (D �. .0 .-. N (n (D m N (05 C C (c = < < O C N 0 N 0 N - 555 -(D 0 r O m 1 • n 0) m C) ° = 3 -o n) co a o n _= 00 o °_ n 0 ° 0 o o m 0 w n('i v c' m < m -i 0))• 0 0 (ND 7 0) 0 0 7 (0n 0 Q 0 0 N O d d °) ° 0 _. 0 ,: 7 7 3 0 Q- °) (D (D CO o 3 CD 0 -10 3 Q N 0 Q n O n ' N 3 a .0 N 0 7 (0' < (D (D -N,+i a ? n 6 Q 0' N N C) n n n 0 N d 0 r- 71 CD o: •<..- a m 3 a v `< o c a N m (� a o o � S - ° m m a) m * a) ° m m v o 0- 7 N O N °- N `2_ O 7 (° (D O N (O °, fl] N N 'O (c ' 3 "06 N (/) •O a 0 O '0 '00 N 3 j- U D n 0 �, O D C co ' O O 3 A) D- (D _a (D n S. (D p "O C) A 5 "O C c 0 0 0 0 (D 0- 0 "O 0 n _l 40 m c 0 ° a 0 CO 0 3 °O °) tHhIIH ° ... 0 <.o (D (n va0 n,O. O 'O O 0 n 0• o m -° 0 c °) °-co o CD o o -m o o 7 m n c c o 7 . m 0 , 0 D C O. .0 N d N • 5 6 p (D 3 n' N -0 N -_° n c co O 07 O en Q O °" C n O O m cc) -° 0 0 -0 0 m v 73g 4.. m °° o <' u) ° ° o < v v, 3. a ° m 3 3 D O O C (D 7 (D (O O O W (D 3 p C -0 (D' °1 a 7 CD -.•• n 0 0 n CO mN (Nn > c cn 0 ° CO n (n N F �' CO0 - (o» n W co c O °- ILI p� c mD0 (D nX 'O NA < ui ' ir ,O„ 5O OWN 0 < 0 N 'C-' C ° cn OC C (n0 3m < o 3a v0 nO (D �: 00 N 0� OQO S73 M• N NaD A (Q NN Q DN C) ) D O X (D TI 0 'O 0 ( Oo N n N -° (n O O (p (n N (D CO m 0 B 0 (° N CD - .z D 73 ST) m 3 a v z0. 0 CO O G co 7 (� E ci V () MO C m m O * 3 C CD _0 o " m 3• 0 * ink 7 N c. A • o �� -, m• O* w co j co 5" (D 3 O - 3 co- 7 o 0 0 7 v -n 07 N O N i 0 -I ZZZZz -< -< -< -< -< -< -< -< -< z -< -< -< z -< z -< ZZz -< -< -< -< -< -< -< -< -< -< -< -< Zzm D D D D ° CD 0n (0n (0n U)) U)) U)) U)) (0o CO) D 0) 0) 0 ° (0n D N D D D COCD ov0) U0) v0) (0n CO CD) CI) (0o V0) 0n cCD UCD) 0) D D 1 \ O (n E3 m r co m _ 00 m Ex K D S o o Z W Ni p m c 0) O � > X o o cQ O „, ° 7 rn o 0Z m n m D o ° -_ 0 3 m o m a °n 0 a) w cn Z �' w ci) cn -10c1,4 CO N s CD C m 3 0 cn CO co N m n a 0 co. 0> m o =. a n D I E co m ° °- .< -° a (O k m (D • o- n a Xy. CD in cc) *. D Co N 0 < D s cn o D c• - O j CO C m 0 O n CD N m a 0 m NCD *, - (0,) 0 0 3 (p j 0 g cn 3 s< m O Cr) ° m co A o. F.D. 0 c) CO 0) - 0 -CIO A o 0 *. 3 > 7 O A N -O D N — °) -° 7 A N' -.°o (CD N a m 3 cn n O n m o a Z_ N 0 0 o O Ni () < O -I OD N CD 01 O • CI)'O O_O O GN' N. (° a-O N j CT) CD N C n CK `. 3 p0 C (O O J O_ C * c - to 0 N A ( C) D w n n (� °) 0 0 3 - ' 0 0 0 CD a )' co s s o ° () DO 0 v > A 0 3 0 57 D 0 Ni (o co 0 w o) D c 3 73 a O O m 0 ° D C 0 c - n, 6 O O 0 (7 (o O (c N °) EE