Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout182-0027. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU B-18
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
182-002
50-029-20702-00-00
9410
Conductor
Surface
Intermediate
Production
Liner
9239
80
2666
8557
1325
9338
20"
13-3/8"
9-5/8"
7"
9169
30 - 110
30 - 2696
28 - 8585
8080 - 9405
30 - 110
30-2695
28 - 8445
7962 - 9234
None
2670
4760
5410
None
4930
6870
7240
9123 - 9198
4-1/2" 12.6# x 5-1/2" 17# 13cr80 x L80 26 - 8136
8962 - 9034
Structural
4-1/2" Baker S3 Packer
7993, 7879
7845, 7993
7737, 7879
Stan Golis
Sr. Area Operations Manager
Oliver Sternicki
Oliver.Sternicki@hilcorp.com
907.564.4891
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028310
26 - 8016
OA at Surface
1.5-gallons WellLock pumped with 1000-psi final pressure. Re-treat with .25-gallons WellLock at 1000-psi final pressure.
612
347
29329
30225
2035
2173
0
0
789
865
322-612
13b. Pools active after work:Prudhoe Oil
5-1/2" Packer
7845, 7737
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
No SSSV Installed
ct to the best of my kno
January 13, 2023
By Samantha Carlisle at 3:35 pm, Jan 13, 2023
WCB 11-1-2023 DSR-1/17/23
182-002
RBDMS JSB 012623
OA Squeeze
PBU B-18
PRUDHOE BAY, PRUDHOE OIL
Repair Well
Sundry Number
322-612
ACTIVITY DATE SUMMARY
11/19/2022
T/I/O = 1020/50/0. Temp = 148°. Steam conductor (wellock). No AL. Evacuated
blue goo & steam cleaned conductor. 20" Conductor depths = 2 o'clock side @ 6". 4
o'clock @ 6". 7 o'clock @ 13", 9 o'clock @ 13 ". Outer casing 9 5/8".
SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30.
11/19/2022
T/I/O=1020/50/0. RD OA & OA companion flange. Pull VR plug from companion side.
RU Integral Flanges and block valves with 1502 caps. Torque flanges to API specs.
11/21/2022
T/I/O = 1100/0+/0. Temp = 146°. OA WellLock Squeeze (repair SC leak). No AL.
OA cemented to surface. Remove 1502 cap & block valve, re-install hardline 90°.
Poured 1 gallon of Wellock to fill OA void & hardline. Pumped 1.5 gallons of
WellLock into OA. No returns in conductor. Heater installed in well house, man door
ajar. Final WHPs = 1100/0+/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00.
11/22/2022
T/I/O = 1100/0+/580. Temp = 144°. WHPs (post wellock). No AL. OAP decreased
420 psi from increase at beginning of shift. Increased OAP to 1000 psi. Wellock
consistancy of cold molasses. Heater still in WH with door propped open. Tree cap
psi @ 1040 psi. Final WHPs =1100/0+/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30
11/23/2022
T/I/O = 1060/0+/720. Temp = 146°. WHPs (post wellock). No AL. OA cemented to
surface. Integrals installed on OA and OA companion. TP decreased 40 psi and
OAP decreased 280 psi over night. Increased OAP to 1000 psi. Wellock sample has
set. Heater still in WH with door propped open. Tree cap psi @ 1040 psi. Final
WHPs = 1060/0+/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:30
11/23/2022
T/I/O = 790/0+/920. Temp = 143°. WHPs (post wellock). No AL. OAP decreased
80 psi from increase at beginning of shift. Increased OAP to 1000 psi. Wellock
consistancy of taffy. Heater still in WH with door propped open. Final WHPs =
790/0+/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:00.
11/23/2022
T/I/O = 790/50/700. Temp = 142°. WHPs (Well Lock). No AL. Integrals installed on
OA and OA companion. Pressured up OAP to 1000 psi. FWHPs = 790/50/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 08:00
11/24/2022
T/I/O = 1060/0+/980. Temp = 146°. WHPs (post wellock). No AL. OA cemented to
surface. Integrals installed on OA and OA companion. OAP decreased 20 psi over
night. Increased OAP to 1000 psi. Wellock sample has not set up. Heater still in
WH with door propped open. Tree cap psi @ 1040 psi. Final WHPs = 1060/0+/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 08:30
11/25/2022
T/I/O = 1050/40/850. Temp = 142°. WHP's (Well Lock). No AL. OA cemented to
surface. Intergrals installed on OA & OA companion. OA decreased 150 psi over
night. Increased OA to 1000 psi. Bled tree cap psi from 1050 psi to 0 psi. Well lock
sample is set but not fully cured. Upon arrival heater was not working. Reinstalled
new working heater upon departure, WH door ajar. Final WHP's = 1050/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 0915
Daily Report of Well Operations
PBU B-18
g
sample is set but not fully cured
OA cemented to surface.
OA WellLock Squeeze (repair SC leak).
g
set.
Well lock
Wellock sample has
Poured 1 gallon of Wellock to fill OA void & hardline. Pumped 1.5 gallons ofg
WellLock into OA. No returns in conductor
Daily Report of Well Operations
PBU B-18
11/26/2022
T/I/O = 1050/40/1000. Temp = 142°. WHP's (Well Lock). No AL. OA cemented to
surface. Integrals installed on OA & companion. Did not increase OA. Bled tree cap
psi from 500 psi to 0 psi. Well lock sample is not fully cured. Heater is working &
installed w/ door ajar. Final WHP's = 1050/40/100.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 08:50
11/27/2022
T/I/O = 1020/40/840. Temp = 142°. WHPs (post wellock). No AL. Wellock sample
firm with a slight give when squeezed. Heater in wellhouse with door propped open.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30
11/28/2022
T/I/O = 1100/40/1000. Temp = 142°. WHPs (post wellock). No AL. Wellock sample
firm with a slight give when squeezed. 5 gallon bucket with leftover wellock still soft.
Heater in wellhouse with door propped open.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30
11/29/2022
T/I/O = 1050/40/1000. Temp = 145°. WHP's ( Post Wellock). No AL. OA cemented
to surface. Wellock sample not fully cured, can still make indent mark in sample. 5
gallon bucket w/ leftover wellock is still soft. Heater is working & installed w/ door
ajar. Did not increase OAP.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:50
11/30/2022
T/I/O = 1050/40/1050. Temp = 150°. WHP's (Post Wellock). No AL. OA cemented
to surface. Wellock sample is not cured, can still make indent mark in sample. 5
gallon bucket w/ leftover wellock is still soft. Did not increase OAP. Heater is working
& installed with WH door ajar.
SV = C. WV, SSV MV = O. IA, OA = OTG. 14:00
12/1/2022
T/I/O = 1050/40/850. Temp = 145°. WHP's (Post Wellock). No AL. OA cemented
to surface. Wellock sample not fully cured. 5 gallon bucket is starting to set up.
Increased OAP to 1000 psi. Heater working & installed w/ WH door ajar. Final
WHP's = 1050/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 12:40.
12/2/2022
T/I/O = 950/40/1000. Temp = 145°. WHP's (Post Wellock). No AL. OA cemented
to surface. Upon arrival wellock sample looked cured. During RD wellock @ 3:00
companion side was not set up. RU accumulator @ 3:00 companion side, increased
OAP to 1000 psi. Wellock appears to be set up @ 9:00 position, guage = 0 psi.
Moved heater trunk to direct heat @ 3:00 companion side. Wellock is not fully cured.
Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 12:30
12/3/2022
T/I/O = 950/40/900. Temp = 145*. WHP's (Post Wellock). No AL. OA cemented to
surface. OA guage on accumulator reading 950 psi, guage on hardline reading 0 psi.
Sample does not appear to be fully cured.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 13:30.
12/5/2022
T/I/O = 950/40/800. Temp = 142°. WHP's (Post Wellock). No AL. OA cemented to
surface. Heater working & installed w/ WH door ajar. Wellock sample not fully cured.
Increased OAP 200 psi. Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 10:15
12/6/2022
T/I/O = 950/40/900. Temp = 145°. WHP's (Post Wellock). No AL. OA cemented to
surface. Heater working & installed w/ WH door ajar. Wellock sample not fully cured.
Increased OAP to 1000 psi. Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 14:30
Daily Report of Well Operations
PBU B-18
12/7/2022
T/I/O = 950/40/750. Temp = 142°. WHP's (Post Wellock). No AL. OA cemented to
surface. Upon arrival heater was not working, ordered new heater. Wellock sample
appears to be set up. Wellock on working side OA @ 9:00 positon appears to be
cured, Wellock @ 3:00 companion side OA is not cured. Increased OAP from 750
psi to 1000 psi. Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30
12/8/2022
T/I/O = 950/40/1300. Temp = 142°. WHP's (Post Wellock). No AL. OA cemented
to surface. Heater working & installed w/ WH door ajar. OA thermaled up over night.
RD jewlery @ 3:00 position to check Wellock, appears to be foamy. Reinstalled
Jewlrey & increased to 700 psi. Wellock still not cured @ 3:00 position. Final WHP's
= 950//40/700.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:30
12/10/2022
T/I/O = 960/40/550. Temp = 142°. WHPs (Wellock). No AL. Heater working
properly. Ajusted heater trunk. Wellock samples cured. OAP decreased 150 psi
from 12/8/22.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 04:00
12/11/2022
T/I/O = 900/40/550. Temp = 140°. WHPs (Wellock). No AL. Heater working
properly. Wellock samples cured. Increased OAP pressure to 700 psi with lift gas
from B-29. OAP decreased 150 psi from 12/10/22. FWHPs = 900/40/700
SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:00
12/12/2022
T/I/O = 940/40/550. Temp = 150°. WHPs (Wellock). No AL. Heater working
properly. Wellock samples cured. TP increased 40 psi and temperature increased
10° over night.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 07:30
12/19/2022
T/I/O = 920/40/600. Temp = 146°. WHPs (Wellock). No AL. Heater working
properly. Wellock samples cured. Wellock is not cured at 3:00 position. OA will
have to be resqueezed with Wellock.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 09:00
12/28/2022
T/I/O = 900/40/0+. Temp = 141°. OA WellLock Re-treat. No AL. OA cemented to
surface. Pumped 1/4 gallon of Wellock into 3:00 side of OA to 2000 psi. No returns
into conductor and no communication with 9:00 side of OA. Moniitored for 1 hr. OAP
unchanged. Bled OAP to 1000 psi. Accumulator hose attached to 3:00 side of OA
charged with lift gas with valves closed for future psi increase. Heater installed in well
house, man door left open. Final WHPs = 900/40/1000.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 15:00.
12/29/2022
T/I/O = 900/40/1050. Temp = 140°. WHP's (post Wellock). No AL. OA cemented to
surface. Heater is working and installed @ 3:00 position w/ WH door ajar. Wellock
sample is not fully cured, starting to set up. Did not increase OAP.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 15:00
12/30/2022
T/I/O = 900/40/950. Temp = 140*. WHP's (post Wellock). No AL. OA cemented to
surface. OAP decreased 100 psi from 12-30-22. Heater is working and installed @
3:00 position w/ WH door open. Wellock sample is not fully cured but is setting up.
Did not increase OAP.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 15:00.
() g
Wellock samples cured. Wellock is not cured at 3:00 position. OA will y
have to be resqueezed with Wellock
Wellock sample g
appears to be set up. Wellock on working side OA @ 9:00 positon appears to beg@
cured, Wellock @ 3:00 companion side OA is not curedA
OA WellLock Re-treat
()
Wellock samples cured
Pumped 1/4 gallon of Wellock into 3:00 side of OA to 2000 psi. No returnsAg
into conductor and no communication with 9:00 side of OA
Daily Report of Well Operations
PBU B-18
12/31/2022
900/40/920. Temp = 142*. WHP's (post Wellock). No AL. OA cemented to surface.
OAP decreased 30 psi from 12-30-22. Heater is working and installed @ 3:00
position w/ WH door open. Wellock sample is not fully cured but is setting up. Did
not increase OAP. Final WHP's = 900/40/920.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 13:30.
1/1/2023
T/I/O = 950/40/920. Temp = 146°. WHP's (post Wellock). No AL. OA cemented to
surface. OAP unchanged since 12/31/22. Heater is working and installed @ 3:00
position w/ WH door open. Wellock sample is not fully cured but is set up. Increased
OAP from 920 psi to 1000 psi. Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 15:50
1/2/2023
950/40/900. Temp = 146°. WHP's (post Wellock). No AL. OA cemented to surface.
OAP decreased 100 psi since 01/01/22. Heater is working and installed @ 3:00
position w/ WH door ajar. Wellock sample is not fully cured but is set up. Increased
OAP from 900 psi to 1000 psi. Final WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 15:20
1/3/2023
950/40/1000. Temp = 142°. WHP's (post Wellock). No AL. OA cemented to
surface. OAP unchanged since 01/02/23. Heater is working and installed @ 3:00
position w/ WH door ajar. Wellock sample is not fully cured but is set up. Final
WHP's = 950/40/1000.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 17:10
1/4/2023
1250/40/850. Temp = 142°. WHP's (post Wellock). No AL. OA cemented to
surface. Heater is working and installed @ 3:00 position w/ WH door ajar. Wellock
sample is cured. Bled OAP to 0 psi, monitor overnight for pressure build up. Final
WHP's = 1250/40/0.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 14:00
1/5/2023
950/40/850. Temp = 142°. Bleed OAP to 0 psi (post Wellock). No AL. OA
cemented to surface. Wellock sample is cured in OA, ops notified. Bled OAP to 0
psi. Well support notified to re-install CV/VR plug & blind on OA. Heater released.
Final WHP's = 1250/40/0.
SV = C. WV, SSV, MV = O. IA & OA = OTG. 11:00
1/5/2023
T/I/O=1250/40/0. Post Wellock. Verified 0 psi on OA, RD working OA hardline and
installed 3" McEvoy valve, Torque to API spec. RD Comp OA hardline and Iinstalled
3" tapped blind. Wellock in VR profile, unable to set VR plug. ***Job Complete***
Final WHP's 1250/40/0.
()
Wellock sample is cured in OA, ops notified
g@
Wellock sample is not fully cured but is setting up.
Post Wellock. Verified 0 psi on OA
Ja
,ISHUIRUDWLQJ
7\SHRI5HTXHVW
2SHUDWRU1DPH
$GGUHVV
&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
$3,1XPEHU
:HOO1DPHDQG1XPEHU
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
$EDQGRQ
6XVSHQG
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO
3HUIRUDWH
3OXJ3HUIRUDWLRQV
5HHQWHU6XVS:HOO
2WKHU6WLPXODWH
)UDFWXUH6WLPXODWH
$OWHU&DVLQJ
3XOO7XELQJ
5HSDLU:HOO
2WKHU
&KDQJH$SSURYHG3URJUDP
2SHUDWLRQVVKXWGRZQ
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
35(6(17:(//&21',7,216800$5<
3HUIRUDWLRQ'HSWK0'IW 3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0'IW
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
&DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH
([SORUDWRU\
6WUDWLJUDSKLF
'HYHORSPHQW
6HUYLFH
$WWDFKPHQWV
(VWLPDWHG'DWHIRU
&RPPHQFLQJ2SHUDWLRQV
:HOO&ODVVDIWHUSURSRVHGZRUN
:HOO6WDWXVDIWHUSURSRVHGZRUN
9HUEDO$SSURYDO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO
3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF
%236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP
2,/
*$6
:,1-
:$*
*,1-
:'63/
*6725
2S6KXWGRZQ
6XVSHQGHG
63/8*
$EDQGRQHG
6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$XWKRUL]HG7LWOH
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$2*&&86(21/<
&RPPLVVLRQ5HSUHVHQWDWLYH
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
/RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV
<HV 1R
1R 6XEVHTXHQW)RUP5HTXLUHG
$SSURYHG%\'DWH
$33529('%<
7+($2*&&&200,66,21(5
3%8%
2$6TXHH]H
+LOFRUS1RUWK6ORSH//&
&HQWHUSRLQW'U6XLWH
$QFKRUDJH$.
-
$'/
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
1RQH
1RQH
[ FU[/
6WUXFWXUDO
%DNHU63DFNHU
3DFNHU
'DWH
6WDQ*ROLV
6U$UHD2SHUDWLRQV0DQDJHU
2OLYHU6WHUQLFNL
2OLYHU6WHUQLFNL#KLOFRUSFRP
358'+2(%$<358'+2(2,/
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
&RPP &RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
1R6669,QVWDOOHG 1R6669,QVWDOOHG
RFHGXUHDSSURYHGKHUHL
2FWREHU
By Anne Prysunka at 1:52 pm, Oct 20, 2022
0*52&76)''65*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2022.10.21 21:22:33
-08'00'
RBDMS JSB 102522
KtĞůů>ŽĐŬ^ƋƵĞĞnjĞ
tĞůů͗ Ͳϭϴ
Wd͗ ϭϴϮͲϬϬϮ
W/͗ϱϬͲϬϮϵͲϮϬϳϬϮͲϬϬ
tĞůůEĂŵĞ͗Ͳϭϴ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϭϴϮͲϬϬϮ
tĞůůdLJƉĞ W W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϬϳϬϮͲϬϬ
:Žď^ĐŽƉĞ͗KtĞůů>ŽĐŬ^ƋƵĞĞnjĞ ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ
ƵƌƌĞŶƚ^ƚĂƚƵƐ͗hŶĚĞƌǀĂů͕ KĨĨůŝŶĞ ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͗
ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϭϭͬϯͬϮϬϮϮ ƐƚŝŵĂƚĞĚ ƵƌĂƚŝŽŶ͗ϮĚĂLJƐ
ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞ ĂƌŬĞƌ
&ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗KůŝǀĞƌ^ƚĞƌŶŝĐŬŝ
^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ
ƌŝĞĨtĞůů ^ƵŵŵĂƌLJ͗
ͲϭϴŝƐĂŶĂƚƵƌĂů ĨůŽǁ ƉƌŽĚƵĐĞƌ ǁŚŝĐŚ ůĂƐƚLJĞĂƌ ďĞŐĂŶĞdžŚŝďŝƚŝŶŐďƵďďůŝŶŐŝŶƚŚĞ ĐŽŶĚƵĐƚŽƌďLJƐƵƌĨĂĐĞ
ĐĂƐŝŶŐĂŶŶƵůƵƐ ŽŶ ϴͬϭϵͬϮϬϮϭ͘ dŚĞKǁĂƐĨƵůůLJ ĐĞŵĞŶƚĞĚ ĚƵƌŝŶŐĂZtKŝŶϮϬϬϵƚŽƌĞƉĂŝƌĂƐƵƌĨĂĐĞ
ĐĂƐŝŶŐůĞĂŬĂƚ Εϱϳ͛͘ dŚĞ ƉƌĞƐƐƵƌĞ ĐŽŵŵƵŶŝĐĂƚŝŽŶƉĂƚŚ ĨŽƌ ƚŚĞ ďƵďďůŝŶŐǁĂƐ ĚĞƚĞƌŵŝŶĞĚ ƚŽďĞ ĨƌŽŵƚŚĞ
/ƚŽƚŚĞK ƚŚƌŽƵŐŚ ƚŚĞ/ƐĞĂůƐŝŶƚŚĞǁĞůůŚĞĂĚŽŶϴͬϮϬͬϮϬϮϭ͘ ŶD/dͲ/ƉĂƐƐĞĚŽŶϴͬϮϰͬϮϬϮϭĂŶĚĂ
ƉƌĞƐƐƵƌĞƚĞƐƚŽĨƚŚĞ /ƐĞĂůƐƉĂƐƐĞĚŽŶϴͬϮϱͬϮϬϮϭĂĨƚĞƌƚŚĞLJǁĞƌĞƌĞĞŶĞƌŐŝnjĞĚ͘ dŚĞ KǁĂƐƚƌĞĂƚĞĚǁŝƚŚ
tĞůůŽĐŬŽŶϵͬϮϬͬϮϬϮϭ ƌĞƉĂŝƌŝŶŐƚŚĞĐŽŶĚƵĐƚŽƌďƵďďůŝŶŐ ĂƚƚŚĞƚŝŵĞ ͘ŽŶĚƵĐƚŽƌďƵďďůŝŶŐŚĂƐďĞĞŶ
ƌĞƉŽƌƚĞĚĂŐĂŝŶ ŽŶϭϬͬϭϲͬϮϬϮϮ ŝŶĚŝĐĂƚŝŶŐƚŚĂƚƚŚĞƉƌĞǀŝŽƵƐƚƌĞĂƚŵĞŶƚŚĂĚďƌŽŬĞŶĚŽǁŶ͘ WWWKdͲ/
ƉĂƐƐĞĚŝŶϭϬͬϭϵͬϮϬϮϮ ĂĨƚĞƌ ƚŽƌƋƵŝŶŐ ƚŚĞ>^ĂŶĚƌĞͲĞŶĞƌŐŝnjŝŶŐ ƚŚĞLJͲƐĞĂůƐŝŶƚŚĞƉĂĐŬŽĨĨ͘ K
ƌĞƚƌĞĂƚŵĞŶƚǁŝƚŚƐĞĂůĂŶƚŝƐŶĞĐĞƐƐĂƌLJ ƚŽƌĞƉĂŝƌƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐůĞĂŬ͘
ƵƌƌĞŶƚ ^ƚĂƚƵƐ͗
Ͳϭϴ ŝƐĐƵƌƌĞŶƚůLJƵŶĚĞƌĞǀĂůƵĂƚŝŽŶƐƚĂƌƚŝŶŐ ϭϬͬϭϴͬϮϬϮϮ͘
^ĐŽƉĞŽĨtŽƌŬ͗
^ƋƵĞĞnjĞKǁŝƚŚ ƐĞĂůĂŶƚ ;Žƌ ŵŝĐƌŽͲĨŝŶĞ ĐĞŵĞŶƚͿƚŽ ƌĞƉĂŝƌ ƐƵƌĨĂĐĞĐĂƐŝŶŐůĞĂŬ͘
WƌŽĐĞĚƵƌĞ͗
9DOYH6KRS 1' 2$*$7( 9$/9(182$,17(*5$/
'+'648((=(2$:,7+ 6($/$17 25 0,&52),1(&(0(17
'+'3238(021,725)25 6&/($.
'+'5(648((=( 2$:,7+:(///2&.,) 1(&(66$5<
9DOYH6KRS 1'2$,17(*5$/182$*$7(9$/9(
ͲϭϴŝƐĂŶĂƚƵƌĂů ĨůŽǁ ƉƌŽĚƵĐĞƌ ǁŚŝĐŚ ůĂƐƚLJĞĂƌ ďĞŐĂŶĞdžŚŝďŝƚŝŶŐďƵďďůŝŶŐŝŶƚŚĞ ĐŽŶĚƵĐƚŽƌďLJƐƵƌĨĂĐĞ
ĐĂƐŝŶŐĂŶŶƵůƵƐ Ž
KtĞůů>ŽĐŬ^ƋƵĞĞnjĞ
tĞůů͗ Ͳϭϴ
Wd͗ ϭϴϮͲϬϬϮ
W/͗ϱϬͲϬϮϵͲϮϬϳϬϮͲϬϬ
+LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH 2FWREHU6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO %6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU:2³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\,QLWLDOV+16$SSURYHG%\,QLWLDOV$2*&&:ULWWHQ$SSURYDO5HFHLYHG3HUVRQDQG'DWH$SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU B-18
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
182-002
50-029-20702-00-00
9410
Conductor
Surface
Intermediate
Production
Liner
9239
80
2666
8557
1325
9338
20"
13-3/8"
9-5/8"
7"
9169
30 - 110
30 - 2696
28 - 8585
8080 - 9405
30 - 110
30 - 2695
28 - 8445
7962 - 9234
None
2670
4760
5410
None
4930
6870
7240
9123 - 9198
4-1/2" 12.6# L80 26 - 8136
8962 - 9034
Structural
4-1/2" Baker S3 Packer 7845, 7737
7845, 7737
7993, 7879
Stan Golis
Sr. Area Operations Manager
Oliver Sternicki
Oliver.Sternicki@hilcorp.com
907.564.4891
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV (type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final
13.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028310
4-1/2" Baker S3 Packer
26 - 8136
7993, 7879
OA from Surface to 40'
17.9-gal 15.6-ppg Permafrost C cement (applied 20-psi squeeze pressure) followed by 19.1-gal WellLock
494
437
36888
19970
1783
2352
1000
300
999
811
321-451
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2021 Submit Within 30 days or Operations
Sr Res Eng:
By Samantha Carlisle at 8:22 am, Oct 08, 2021
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.10.08 07:05:29 -08'00'
Stan Golis
(880)
MGR15OCT2021 DSR-10/11/21
RBDMS HEW 10/8/2021
SFD 10/8/2021
ACTIVITYDATE SUMMARY
9/13/2021
T/I/O = SSV/0/0. Verified Zero flow on working OA. Removed working side OA.
Installed integral w/Block vlave and cap. FWHP = SSV/0/0 OTG.
9/16/2021
T/I/O = SSV/0/0. Temp = SI. Steam conductor (Pre Wellock). Performed a NFT test
on the OA. Removed 1502 OA block valve and strapped the TOC in the OA @ 10'
w/ 8' of liquid (25 gallon fill up). Steamed the conductor flutes for 5 hours. Flute @
the 4 o'clock position has a 61" void (leak point). All other flutes are ~18" deep.
Flutes will need more steaming if conductor is to be cemented. Ran out of time.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 15:10
9/18/2021
T/I/O = SSV/0+/0. Temp = SI. Cement OA (Pre wellock). No AL. Performed a NFT
on the OA. Removed 1502 block valve and strapped OA at 10' (2' of liquid in OA).
Used a barrel pump to remove 1' of liquid from the OA (could not pull from exact
bottom). Poured 18.4 gallons of perm - C into the OA to fill. Incrementally applied N2
to the OA to create a void (@ 200 psi conductor filled up w/ cement, ~ 1.5 gallons
returned from conductor). Poured another gallon of Perm - C into the OA to fill and
applied 40 psi of N2 (no returns from conductor. After initial set-up (2 hours) OAP
decreased to 30 psi (no returns from conductor). FWPs = SSV/0+/30.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:50
9/20/2021
T/I/O = SSV/0+/0+. Temp = SI. OA WellLock Squeeze (repair SC leak). No AL. OA
cemented surface (~7' TOC). Remove 1502 cap & block valve, re-install 1502 90° &
pup joint. Poured 16 gallons of Wellock to fill OA void. Pumped 3.1 gallons of
WellLock into OA when returns began coming out of the flute @ the 1 o'clock
position. Monitor WH temp & Wellock sample until sample is set up. WH temp
between 60° - 90° until sample is set up. Heater installed in well house, man door
ajar. Final WHPs = SSV/0+/140.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00
10/1/2021
T/I/O=SSV/0/0. Post well lock job. RD 3" 5000 integral and hardline. RU 3" McVoy
O/A valve. Torqued to API spec. Job Complete. Final WHP's SSV/0/0.
10/1/2021
T/I/O = SSV/0+/80. Temp = SI. WHPs (post Wellock). No AL. Heater working
properly. Both wellock samples are set up. Ops to keep heater.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 07:30
10/2/2021
T/I/O = 900/137/0. Temp = 132*. WHP's (post well lock). No AL. Heater removed,
well was POP'd this AM.
10/3/2021
T/I/O = 920/270/0. Temp = 134*. WHPs (post wellock). No AL. OA cemented to
surface. Heater has been removed and the well has been popped.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 04:00
10/4/2021
T/I/O = 880/350/0. Temp = 138°. WHPs (Post Wellock). No AL. IA FL @ surface.
OA cemented to surface. IAP increased 80 psi since yesterday at 04:00.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:00
Daily Report of Well Operations
PBU B-18
7. If perforating:
1. Type of Request:
2. Operator Name:
3. Address:
4. Current Well Class:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Property Designation (Lease Number):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well
Other:
Change Approved Program
Operations shutdown
What Regulation or Conservation Order governs well spacing in thes pool?
Will planned perforations require a spacing exception?Yes No
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD):
PRESENT WELL CONDITION SUMMARY
Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft):
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
12. Attachments:
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
15. Well Status after proposed work:
16. Verbal Approval:
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approcal.
Proposal Summary Wellbore schematic
BOP SketchDetailed Operations Program
OIL
GAS
WINJ
WAG
GINJ
WDSPL
GSTOR
Op Shutdown
Suspended
SPLUG
Abandoned
ServiceDevelopmentStrastigraphicExploratory
Authorized
Name:
Authorized Title:
Authorized Signature: Date:
Contact Name:
Contact Email:
Contact Phone:
COMMISSION USE ONLY
Commission Representative:
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Location ClearanceMechanical Integrity TestBOP TestPlug Integrity
Other:
Post Initial Injection MIT Req'd?
Spacing Exception Required?Yes
Yes No
No Subsequent Form Required:
Approved By:Date:
APPROVED BY
THE COMMISSIONCOMMISSIONER
PBU B-18
OA Squeeze
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
182-002
50-029-20702-00-00
N/A
ADL 0028310
9410
Conductor
Surface
Intermediate
Production
Liner
9239
80
2666
8557
1325
9338
20"
13-3/8"
9-5/8"
7"
9169
30 - 110
30 - 2696
28 - 8585
8080 - 9405
2558
30 - 110
30 - 2695
28 - 8445
7962 - 9234
None
2670
4760
5410
None
4930
6870
7240
9123 - 9198 4-1/2" 12.6#L80 26 - 81368962 - 9034
Structural
4-1/2" Baker S3 Packer
5-1/2" Brown Packer
7845, 7737
7993, 7879
Date:
Stan Golis
Sr. Area Operations Manager
Oliver Sternicki
Oliver.Sternicki@hilcorp.com
907.564.4891
PRUDHOE BAY, PRUDHOE OIL
9/20/2021
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval.
By Samantha Carlisle at 10:15 am, Sep 07, 2021
321-451
Digitally signed by Stan Golis
(880)
DN: cn=Stan Golis (880),
ou=Users
Date: 2021.09.04 16:10:32 -08'00'
Stan Golis
(880)
DSR-9/7/21MGR15SEP2021SFD 9/7/2021
10-404
dts 9/15/2021
JLC 9/15/2021
Jeremy Price
Digitally signed by Jeremy
Price
Date: 2021.09.16 10:28:26
-08'00'
RBDMS HEW 9/16/2021
OA WellLock Squeeze
Well: B-18
PTD: 182-002
API: 50-029-20702-00-00
Well Name:B-18 Permit to Drill Number:182-002
Well Type P API Number:50-029-20702-00-00
Job Scope:OA WellLock Squeeze Reg.Approval Req’d?Yes
Current Status:Under Eval, Offline Date Reg. Approval Rec’vd:
Estimated Start Date:09/20/2021 Estimated Duration:2day
Regulatory Contact:Mel Rixse
First Call Engineer:Oliver Sternicki
Second Call Engineer:Wyatt Rivard
Brief Well Summary:
B-18 is a natural flow producer which on 8/19/2021 began exhibiting bubbling in the conductor by
surface casing annulus. The OA was fully cemented during a RWO in 2009 to repair a surface casing leak
at ~57’. The pressure communication path for this recent bubbling was determined to be from the IA to
the OA through the IC seals in the wellhead on 8/20/2021. An MIT-IA passed on 8/24/21 and a pressure
test of the IC seals passed on 8/25/2021 after they were reenergized.
Current Status:
B-18 is currently under evaluation starting 08/19/2021.
Scope of Work:
Squeeze OA with Well Lock (or similar) to repair surface casing leak.
Procedure:
1 Valve Shop ND OA GATE VALVE, NU OA INTEGRAL
2 DHD STRAP TOC. TOP OA WITH CEMENT AS NEEDED. WELL LOCK OA
SQUEEZE
3 Special Projects A/DHD WELL LOCK SQUEEZE
4 DHD POP U/E, MONITOR FOR SC LEAK,
5 Valve Shop ND OA INTEGRAL, NU OA GATE VALVE
6 DHD RE-SQUEEZE OA WITH WELL LOCK IF NECESSARY.
g bubbling in the conductor
OA WellLock Squeeze
Well: B-18
PTD: 182-002
API: 50-029-20702-00-00
� � • •
f c 9
11-
a)
r
LIVI
v �t�w 440 `0 a
CL H ca 4- D to h
0O 0 Y 0 a) E a
0 N Z --1 Z r r r r r r r r r r U 4 >
O�m co 0 a0
Ls C. C C
<-7-- O a m '� > y
73
d
❑ -' w co rm co m " C
p 0-
ma
co ` N
d r C7 Qa
Oo o
°Q cn N O tQ o p p « srw C u a)N N ,- ' N N r CD 0 C
Z Q M -00 +'
Z d q11
. a u
CU > o v
d F- • O C i
❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ C t.- a -, U
J J J J J J J J J J -" C y= O
W W W W W W W W W Wt,, a
LL LL LL LL LL LL U. LL LL LL a� aa) a) -0
C J J J J J J J J J J a 0 > Q)
td d d d d d d d d d d (1) v, C , 4-
5 C, Z Z Z Z Z Z Z Z Z Z u ca a) O
• c) LL U. U. U. U. U- U- U. U. LL CC L -0 4-, >
G �c ...'r Z• m a) a) O O to o
� >
O O a) a) a) @ a) Y U L C
b •O rO loJ N d d < a) a a c a
J
O 0 WLI-I W W O O O J 3 O U
a' cc re Q' L- ❑ to
LL, F- F- F- D a 7 J F- = J
F rt ,ea � vC G . cezz z
M O tb _ _
W 0.) to w 7 7 5
V > ❑ a a a s n
m
o tq °° °tS "Z ° NJ
kJ Z
14 CI.y CO V a J J J J O J J J J O C�
A S yb
tel C",
. . 3333 3333 E , �W
It 11).2—ViiIP a CI
>- >- Y >- >• >- r r >- > 1 WI
-
w Q Q Q Q Q Q Q Q d d
g m CO CO CO m CO CO CO CO m
< W W W W W W W W W W
2 0 0 0 0 0 0 0 0 0 0 Itn
0 1111111111
000000000 0 v
w > > > > > > > > > > '
Cila a a a a a a a a a li ro 0
p� � a
FS 0 0 ' o o '- c(NN o COM0 CV in
X v) 0 0CO
N ! Cr N O 0 r 0 0 0 0 0 0 (0 Ln0)
j
0 0 0 0 O 0 O 0 0 0 0
O 0 O O O O O O O O E Q
ill C 0 5 ,._� Y 2 2 Q N a. 0 2 2 N �_ v
• Z Z a O O Z Z Y • CIO
LLI COO 00 C1001:10 M
gg�� �� a L
33s
V
or R . . . . O O 0 0 ++ <
O O O O O O O O O O d
coN , O TorN 0 of O N 4, 'B
CO 00 a_0 N N C") 'Cr C) m
N N N N N N N N N N N tn U
NC) O) O) O) 0) O) C) O) C) O) C 0
091 N N N N N N N N N N
000000000 O fl0 aC
O 0 0 0 0 0 0 0 0 0 y f' a/
00 N N CL) in N in C() CC) U) 1l) a -a 0]
CD tc LLti •y d w
On $i E u C E O
Z 0 •0q 0 0
CID W Y p :W. 3 of U
.tit 14 co, Z @
9 Z a a �+ Q W 3 ca m o M rn v E a -0
c mom d 6 E N _, ❑ 3 0 m co m c $ 6 E cc
n J
0 �C r b 3 O O p O co c y . a
L� Q H a` a ns m
o7r27n o
C~
Schlu~6erper
Alaska Data 8 Consulting Services
2525 Gambell Street, Suite 400
Anehorege, AK 99503-2838
ATTN: Beth
Well Job #
N0.5567
Company: State of Alaska
Alaska Oil 8 Gas Cons Comm
Attn: Christine Mehnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Log Description Date BL Color CD
P2-16
F BB6M-00027. LDL - 1
- 07/20/10 1 1
-03A
V
225 AYKP-00096 SCMT ~ ~ 07/22/10 1 i
-
S-100 BBKA-00039
BC22-00014 USIT _
USIT ... r ~ 07/01/10
07/14/10 1
1 1
1
2-58/S-09 BCZ2-00016 LDL 07/17/10 1 1
1-15/P-25 AYKP-00094 LDL - 07/11/10 1 1
W-19A BCRD-00036 USIT 07/25/10 1 1
01-228 AZ2F-00042 MCNL _ 05/19/10 1 1
8-20 AY1M-00042 RST - 05/07/10 1 1
04-20
8-18
05-32A BCRJ-00020
AYKP-00082
BBK5-00040 RST
RST
RST 05/30/10
06/02/10
05/19/10 1
1
1 1
1
1
H-25
P2-34 BCRD-00017
AVVO.00063 RST
RST - 05/10/10
04/17/10 1
1 1
1
PLEACF A(`KNrIWI Fnr:F QCr `C1oT Cv Crnruu n_ wr.in oeT„nun,n ...,~ ........ ~..... .....
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Btvd.
Alaska Data 8 Consulting Services
2525 Gambell Street, Suee 400
Anchorage, AK 99503-2838
+~'9
au~~ ~ a~ ~a1o
~~F,-,. • pit ~. ~
~~
ib
•
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
Dec 11, 2009
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB Pad B
Dear Mr. Maunder,
by
:~ ~,
A ~~ ' ~tU
w : ~:r~r. . ~~o~nssar~
,_ .~._.
~a-oo~-
Q-l~
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad
B that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date: 12/11/09
Well Name
PTD #
API #
Initial to of cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
B-01 1700080 50029200590000 Sealed Conductor NA NA NA NA NA
B-02 1961110 50029200660100 Sealed Conductor NA NA NA NA NA
B-03A 1870480 50029203060100 NA 0.5 NA 3.40 8/20/2009
B-04 1700320 50029200720000 Sealed Conductor NA NA NA NA NA
B-058 2010680 50029202760200 NA 1.8 NA 13.60 8/22/2009
B-06 1770740 50029202790000 NA 1 NA 5.10 8/20/2009
B-07 1780020 50029202850000 NA 1 NA 5.10 8/20/2009
B-08 1780410 50029203140000 NA 1 NA 6.80 8/20/2009
B-09 1780490 50029203160000 NA 0.5 NA 3.40 8/20/2009
B-10A 2082050 50029203210100 Cellar liner welded to casin NA NA NA NA NA
B-11 1780690 50029203310000 NA 0.5 NA 3.40 8/20/2009
B-12 1970090 50029203320100 NA 0.6 NA 3.40 8/22/2009
B-13 1990570 50029203410100 NA 0.4 NA 1.70 8/20/2009
B-14 2090590 50029203490000 NA 0.4 NA 1.70 8/20/2009
8-15 1790190 50029203600000 NA 0.1 NA 1.70 8/20/2009
B-16 1790250 50029203650000 NA 0.8 NA 5.10 8/21/2009
B-17 1790280 50029203680000 NA 0.1 NA 1.70 8/20/2009
B-18 1820020 50029207020000 NA 1.5 NA 15.30 8/21/2009
B-19 2001610 50029207030100 NA 0.1 NA 1.70 8/21/2009
B-20 1821680 50029208420000 NA 0.5 NA 3.40 8/21/2009
B-21 1821760 50029208500000 25 4.5 BBLs 0.1 11/30/2009 1.70 12/3/2009
B-22A 2001570 50029207590100 34 6.5 BBLs 0.2 11/30/2009 1.70 12/3/2009
B-23 1970590 50029207790100 12 2.2 BBLS 3.2 11/30/2009 10.20 12/4/2009
B-24 1821400 50029208150000 NA 3 NA 22.10 8/21/2009
B-25 1821510 50029208260000 NA 0.25 NA 1.70 8/13/2009
B-26 2000570 50029209760200 NA 0.3 NA 1.70 8/21/2009
B-27 1961010 50029214710100 Sealed Conductor NA NA NA NA NA
B-28 1853030 50029215100000 NA 1.1 NA 6.80 8/22/2009
B-29 2002090 50029215230100 NA 0.7 NA 6.80 8/21/2009
B-30 2011050 50029215420100 NA 0.2 NA 1.70 8/21/2009
B-31 1910460 50029221520000 NA 0.3 NA 1.70 8/20/2009
B-32 1991180 50029221650100 NA 0.3 NA 1.70 8/20/2009
B-33 1931450 50029223390100 NA 1.2 NA 8.50 8/21/2009
8-34 1930370 50029223520000 NA 1.2 NA 10.20 8/21/2009
B-35 1931460 50029224060000 NA 0.3 NA 1.70 8/20/2009
B-36 1960650 50029226670000 NA 0.3 NA 1.70 8/21/2009
B-37 2071450 50029233750000 Sealed Conductor NA NA NA NA NA
STATE OF ALASKA Q
ALA OIL AND GAS CONSERVATION COM~ION
~ u
CEP ~ ®?Q0~
REPORT OF SUNDRY WELL OPERATIONS -
1, Operations Performed: °`'°' `- ='"
~~ ..
^ Abandon ®Repair Well , ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
®Alter Casing ®Pull Tubing ~ ^ Perforate New Pool ^ Waiver ^ Other
^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill. Number:
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 182-002
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20702-00-00'
7. KB Elevation (ft): 73 8,, 9. Well Name and Number:
PBU B-18 -
8. Property Designation: 10. Field /Pool(s):
ADL 028310 ~ Prudhoe Bay Field / Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 9410' feet
true vertical 9239' , feet Plugs (measured) 8054'
Effective depth: measured 9338' feet Junk (measured) None
true vertical 9169' feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110' 20" x 30" 110' 110'
Surface 2696' 13-3/8" 2696' 2695' 4930 2670
Intermediate 8585' 9-5/8" 8585' 8445' 6870 4760
Production
Liner 1325' 7" 8080' - 9405' 7962' - 9234' 7240 5410
~cy~}~~ ~~; ~. ~ 2008
Perforation Depth MD (ft): Below Plug: 9123' - 9198'
Perforation Depth TVD (ft): 8962' - 9034'
5-1/2", 17# x 4-1/2", 12.6# 13Cr80 / L-80 8136'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker S-3 Packer 7845'
9-5/8" x 5-1/2" BOT Packer 7993'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final p ressure:
Cut and pull tubing from 7934'. Cut and pu119-5/8" casing from 2120'. Run 9-5/8" (47#, L-80) tieback to surface. Cement w/ 155 bbls
Class 'G' 870 cu ft / 750 sx . Clean out and run new Chrome tubin .
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation: 0 0 0
Subsequent to operation: 397 7701 3107 1740 600
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work:
^ Exploratory ®Development ^ Service
® Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ®Oil ~ ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N!A if C.O. Exempt:
Contact Hank Baca, 564-5444 308-230
Printed Na a Sondra Stewman .Title Drilling Technologist
`.~~ Prepared By NamelNumber:
~
~
ignature Phone 564-4750 Date
Terrie Hubble 564-4628
j
Form 1 Revised 04 Submit Original Only
__ /~~
_ ~~ SEP ~~ ~QQ~
.~ ~~ t ~ ~ 1 v/ fit-.
l\
41
WELLHEAD= Cameron
ACTUATOR= Cameron
KB. ELEV = 73.75'
BF. ELEV = ..45.3'
KOP = 5900'
Max Angle = 22@ 6500'
Datum MD = 9032'
Datum TV D= 8800' SS
9-518" CSG PATCH, 47#, L-80; iD = 8.681" ~~ 211s
13-3/8" CSG, 72#, L80, ID = 12.347" 2696'
L T
20' CONDUCTOR -~ 110'
B-18
S OTES: ***4-1 /2" CHROMETBG***
2102-19 5/8" HES ES STAGE CEMENTER
2125' 4-1,2" OT1S X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
4 3296 3295 0 MMG DOME RK 16 08!17/08
3 5618 5617 0 MMG SO RK 20 08/17/08
2 6966 6904 21 MMG DCv1Y RK 0 48J13108
1 7753 7648 17 MMG Div1Y RK 0 48J13108
Minimum ID = 3.725" @ 8094'
4-1/2" OTIS'XN' NIPPLE
7$24" -14-112" OTIS X NIP, ID = 3.813"
4-112" TBG, 12,6#, 13CR80, .0152 bpf, ID = 3.958" ~ 7920'
4-1/z" TUBING STUB (07/22108) 7934'
5-1/2" TBG, 17#, L80, .0232 bpf, ID = 4.892" ~~ 7993'
TOP OF 7" LNR ~~ 8080'
4-1/2" TBG,12.6#, L-80 .0152 bpf, ID = 3.958" ~ 8136'
9-518" CSG, 47#, L-80, ID = 8.681" 8585'
PERFORATION SUMMARY
REF LOG: DA-BHCA ON 05/21/82
ANGLE AT TOP PERF: 15 @ 9156'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-1/8" 4 9090 - 9116 S 04/06/89
3-1/8" 4 9120 - 9123 S 04/06/89
3-3/8" 4 9123 - 9147 O 04/13/89
2-7/8" 4 9156 - 9166 S 04/06/89
2" 4 9164 - 9174 O 05/24/00
3-3/8" 4 9184 - 9198 O 04/13/89
PBTD 9338'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9405'
MA RKER JOINT
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/25/82 ORIGINAL COMPLETION
08/14/08 N4ES RWO
08/18/08 KDGSV GLV GO (08/17/08)
PRUDHOE BAY UNIT
WELL: B-18
PERMfr No: x1820020
API No: 50-029-20702-00
SEC 31, T11 N, R14E
BP Exploration (Alaska)
7845' 9 5J8" x 4-1?2" BKR S-3 PKR, ID = 3.875"
7870' 4-112" OTIS X NIP, ID = 3.813"
7925' 9-5I8" x 5-1f2" UNIQUE OVERSHOT
7973' BOT SBR SEAL ASSY
7993' 9 5/8" x 5-1/2" BOT PKR, ID = 4.75"
7993' 5-1 /2" x 4-1 /2" XO
$054' 4-1/2" OTIS X NIP, ID = 3.813"
8094' 4-1 /2" OTIS XN NIP, ID = 3.725"
8136' 4-1/2" TTL BOT SO SUB, ID = 4.063"
8128' --~MD TT LOGGED 06/29/83
.Page 1~ of 3
Well: 6-18
Well History
Well Date Summary
B-18 7/16/2008 T/I/O = 30/0+/0. Temp = SI. Bleed WHPs to 0 psi pre PPPOT (RWO prep). No AL line. TBG FL near
surface. IA FL near surface. Bled TBGP from 30 psi to 0 psi in 10 min into BT. Bled IAP from 0+ to 0 psi
in 2 min into BT. Monitored pressures for 30 min. TBGP &IAP unchanged. Cellar liner previously
installed around conductor, fluid in cellar -2" above cellar liner. Final WHPs = 0/0/0.
MV &SSV open. Swab & WV closed. IA & OA valves OTG's.
B-18 7/17/2008 T/I/0= 0/0/0. Temp= SI. WHPs post- bleed pre- PPPOT. TP, IAP, OAP unchanged overnight.
SV, WV=Closed. SSV, MV= Open. IA and OA= OTG.
B-18 7/17/2008 T/I/0= 0/0/0, Temp=S1. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO.
PPPOT-T: Alemite external check previously installed. Stung into test port (400 psi), bled to 0 psi.
Function LDS, all moved freely. Pumped through void, clean returns. Pressured void to 5000 psi for 30
min test, lost 200 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi.
PPPOT-IC: Alemite external check previously installed. Stung into test port (0 psi). Function LDS, all
moved freely. Pumped through void, clean returns. Re energized secondary Y seal with plastic.
Pressured void to 3500 psi for 30 min test, lost 150 psi in 15 min, lost 0 psi in second 15 min (PASS).
Bled void to 0 psi.
B-18 7/18/2008 ***WELL S/I ON ARRIVAL****
PUI I Ff) P-PRONG FROM PX PLUG BODY (c~ $054' MD
PULLED 4 1/2 PLUG BODY FROM 8054' MD
DRIFTED TBG W/ 4.50" CENT TO TOP OF 4 1/2 XO @ 7993' MD
DRIFTED TO 8200' SLM W/ 3.70" CENT
***CONTINUED ON WSR 07/19/08***
**NOTE: FLUID IN CELLAR ON ARRIVAL**
B-18 7/19/2008 ***CONTINUED FROM WSR 07/18/08***
RIG DOWN SLICKLINE UNIT
***WELL LEFT S/I, DSO NOTIFIED***
B-18 7/19/2008 T/I/0=13/2/1. Temp=Sl. WHP's & check cellar for liner. (Pre-RWO). TP increased 13 psi in 2 days. IAP
increased 2 psi in 2 days. OAP increased 1 psi in 2 days. Cellar has a removable liner around SC with 4"
walls and is attached with velcro. Cellar has 8" of standing water in it and needs to be vac'ed out.
SV & WV CLOSED MV &SSV OPEN. IA & OA OTG.
B-18 7/20/2008 ***WELL SHUT IN ON ARRIVAL. INITIAL T/I/O: 0/0/0.***
RIH--TS: HEAD/ 2 WEIGHT BARS/ CCU HALLIBURTON SETTING TOOU 4.5" HALLIBURTON PLUG.
SET TOP ELEMENT AT 8030 FT PER PE'S INSTRUCTIONS.
SURFACE AND VISUAL IND ATION OF SETTING.
RUN SLB LEAK DETECTION LOG WITH LRS PUMPING.
***JOB IN PROGRESS AND CONTINUED ON 21-JUL-2008 WSR***
B-18 7/20/2008 T/I/0=0+/0+/0+. SI. TBG & IA FL (for-Fullbore). TBG FL near surface. IA FL C~ 42' (2 bbls).
SV, WV=closed. SSV, MV=open. IA & OA valves OTG.
B-18 7/20/2008 T/I/0= 0/0/0. Assist E-Line with LDL. (RWO Prep) Pressure the TBG to 3000 psi with 5 bbls of crude.
***WSR continues on 07/21/08**"
B-18 7/21/2008 ***LOG CONTINUED FROM 20-JUL-2008***
CONTINUE SLB LEAK DETECTION LOG WITH LRS PUMPING.
RIH WITH HEAD/2 -WEIGHT BARS/ CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5" HAL
FASDRILL PLUG. MAX OD= 3.66", TOOL WEIGHT= 250 LBS. IGNITOR DID NOT FIRE, PLUG DID
NOT SET. POOH.
RIH WITH TS: HEAD/2 -WEIGHT BARS/CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5"
HAL FASDRILL PLUG. MAX OD= 3.66", WEIGHT= 250 LBS. SURFACE AND VISUAL CONFIRMATION
OF PLUG SETTING.
RIH WITH HEAD/CCL/WPSA/SHOCK MANDREL X 2/FIRING HEAD/4.15" POWER CUTTER. MAX OD
= 4.15", WEIGHT = 200 LBS.
***JOB IN PROGRESS AND CONTINUED ON 22-JUL-2008 WSR***
B-18 7/21/2008 ****LOG CONTINUED FROM 20-JUL-2008"`***
CONTINUE SLB LEAK DETECTION LOG WITH LRS PUMPING.
RIH WITH HEAD/2 -WEIGHT BARS/CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5" HAL
FASDRILL PLUG. MAX OD= 3.66", TOOL WEIGHT= 250 LBS. IGNITOR FIRED, PLUG DID NOT SET.
POOH.
Page 2 of 3
"
~
~
ON SETTING TOOU 4.5
2 -WEIGHT BARS/ CCL FIRING HEAD/ HALLIB
RIH WITH TS: H
HAL FASDRILL PLUG. MAX OD= 3.66", WEIGHT= 250 LBS. SURFACE AND VISUAL CONFIRMATION
OF PLUG SETTING.
RIH WITH HEAD/CCL/WPSA/SHOCK MANDREL X 2/FIRING HEAD/4.15" POWER CUTTER. MAX OD
= 4.15", WEIGHT = 200 LBS.
****LOG CONTINUED ON 22-JUL-2008****
B-18 7/21/2008 T/I/O = 0/0/0. Temp = SI. Install Katch Kan in cellar (pre rig). No AL line. Installed 36" Katch Kan around
conductor. Cellar liner previously installed is partially frozen to ground, will need heater & vac truck after
Katch Kan is removed.
MV &SSV open. WV & SV closed. IA & OA valves OTG's.
B-18 7/21/2008 T/I/0= 0/0/0. Temp = SI. Assist E-Line (RWO Prep)MIT-T *PASSED* to 1000 psi. Pumped 1.2 bbls of
74* crude to achieve test pressure. Lost 40 psi / 1st 15 min & 20 psi / 2nd 15 min. Lost 60 psi during the
30 minute test. Bled back -1 bbl to FWHP= 0/0/0. Annulus casing valves are open to gauges. E-Line had
well control upon our departure.
B-18 7/21/2008 ****LOG CONTINUED FROM 20-JUL-2008****
CONTINUE SLB LEAK DETECTION LOG WITH LRS PUMPING.
RIH WITH HEAD/2 -WEIGHT BARS/ CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5" HAL
FASDRILL PLUG. MAX OD= 3.66", TOOL WEIGHT= 250 LBS. IGNITOR FIRED, PLUG DID NOT SET.
POOH.
RIH WITH TS: HEAD/2 -WEIGHT BARS/ CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5"
HAL FASDRILL PLUG. MAX OD= 3.66", WEIGHT= 250 LBS. SURFACE AND VISUAL CONFIRMATION
OF PLUG SETTING.
****JOB COMPLETE. NOTIFIED DSO OF VALVE POSITIONS.****
B-18 7/21/2008 ****LOG CONTINUED FROM 20-JUL-2008****
CONTINUE SLB LEAK DETECTION LOG WITH LRS PUMPING.
RIH WITH HEAD/2 -WEIGHT BARS/CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5" HAL
FASDRILL PLUG. MAX OD= 3.66", TOOL WEIGHT= 250 LBS. IGNITOR FIRED, PLUG DID NOT SET.
POOH.
RIH WITH TS: HEAD/2 -WEIGHT BARS/CCL FIRING HEAD/ HALLIBURTON SETTING TOOU 4.5"
HAL FASDRILL PLUG. MAX OD= 3.66", WEIGHT= 250 LBS. SURFACE AND VISUAL CONFIRMATION
OF PLUG SETTING.
B-18 7/21/2008 ***WSR continued from 7/20/08*** Assist E-Line with LDL. Pump 2 bbls of crude to maintain 3500 psi
during logging., MIT-T *FAILED* to 1000 psi. (3 attempts) Lost 80 psi / 1st 15 min & 80 psi / 2nd 15 min.
Lost a total of 160 psi during minutes of test #3. Final WHP = 0/0/0. Annulus casing valves are open
to gauges. SWS E-Line had control of the well upon our departure.
B-18 7/21/2008 T/I/O = 0/0/0. Temp = SI. Eval cellar for possible gravel removal pre-Katch-Kan. Cellar is -59"deep with
10" fluid in cellar (measured C~1 tree). Conductor is 30" and gravel level is -2' below conductor top. Flutes
are -14" deep with 2" fluid. Well currently has yellow cellar liner installed, will need removed prior to any
gravel removal/Katch-Kan installation.
Wellhead valves turned over to SLB unit currently on well.
B-18 7/22/2008 ***LOG CONTINUED FROM 21-JUL-2008**'*
CONTINUE TO RIH WITH HEAD/CCL/WPSA/SHOCK SUBS X 2/FIRING HEAD/4.15" POWER JET
CUTTER.
JET CUT 5-1/2" TBG C~3 7934'...POSITIVE INDICATION OF FIR
--Fi1~TALT/17~(J7fJ7QF
****WELL LEFT SHUT-IN. DSO NOTIFIED****
B-18 7/23/2008 T/I/0= 0/80/0 Temp=S/I Circ well CMIT TxIA PASSED to 3500 psi (RWO prep) Pumped a 5 bbl neat
spear followed by 824 bbls of 9.3 NaCI brine down the tubing taking returns up the IA to the flow line.
Pumped 34 bbls of diesel into the tubing to freeze protect, U-Tube diesel into place. CMIT TxIA with 6
bbls of diesel. T/IA lost 40/40 psi in the 1st 15 mins, T/IA lost 20/20 psi in the 2nd 15 mins for a total loss
of 60/60 psi in 30 mins. Bled pressures. Final WHP's = 0/0/0 Valve positions at time of departure: Swab
closed /Wing closed /SSV closed /Master open / IA open to gauge / OA open to gauge
B-18 7/24/2008 T/I/0=0/0/0. Set 6" CIW J BPV. Pre Nabors 4ES.
B-18 8/1/2008
~~ T/I/O =Vac/0/0 Pulled 6 3/8" CIW J BPV Rig 4ES move on well.
B-18 8/2/2008 T/I/O = 0/0/0 Pulled 6-3/8" CIW "H" TWC #419 C~ 102" 3-5" ext. used ....post BOP test for 4ES...no
problems.
B-18 8/14/2008 T/I/0=0/0/0; Pull 4-1/16" CIW "H" BPV #255 thru tree for 4ES Completion; 1-2' ext. used, tagged C~3 102";
(Best/Wortham)
B-18 8/14/2008 T/I/0= 0/0/0; pull 4-1/16" CIW "H" TWC #255 thru tree for 4ES Completion; 1-2' ext. used, tagged C~3
108"; (Best/Wortham)
Page 3 of 3
B-18 8/15/2008 T/I/0=0/0/0; Pull 4-'716" CIW "H" BPV thru tree post 4ES; 1-2' ext. used,~gged C 102"; (Best/Wortham)
B-18 8/16/2008 ***WELL S/I ON ARRIVAL*** (post rig)
PULL B&R FROM X-NIP C~ 7870' MD.
ULL RK-DGLV FROM # 56 8' MD, RKP-DCR GLV FROM STA #4 @ 3296' MD.
****CONT JOB ON 8-17-08****
B-18 8/17/2008 ****CONT JOB FROM 8-16-08****(post rwo)
SET RK-LGLV IN STA # 4 ~ 3296' MD, RK-OGLV IN STA #3 ~ 5618' MD.
PULL RHC PLUG FROM X-NIP ~ 7870' MD.
TAG TD W/ 3.68" CENT, TEL, S-BAILER ~ 9220' MD. (S-BAILER EMPTY)
****WELL LEFT S/I, PAD OP NOTIFIED****
B-18 9/4/2008 ***WELL FLOWING ON ARRIVAL***(GL for rate)
SET 4 1/2" WHIDDON CATCHER C~ 8071' SLM
PULLED DGLV FROM STA# 1 ~ 7744' SLM
PULLED DGLV FROM STA# 2 ~ 6959' SLM
PULLED DGLV FROM STA# 3 ~ 5612' SLM
****CONT ON WSR 9/5/08****
B-18 9/5/2008 ****CONT FROM WSR 9/4/08**** (gl for rate)
PULLED LGLV & SET LGLV IN STA# 4 C~3 3287' SLM (PORT 16/64" TRO 1677 LBS)
SET LGLV IN STA# 3 C~3 5612' SLM (PORT 16/64", TRO 1679 LBS)
SET LGLV IN STA# 2 ~ 6959' SLM (PORT 16/64", TRO 1669 LBS)
SET OGLV IN STA# 1 C~ 7744' SLM (PORT 24/64")
PULLED WHIDDON CATCHER FROM 8071' SLM (EMPTY)
****WELL TURNED OVER TO PAD-OP UPON DEPARTURE****
Print Date: 9/8/2008 Page 1 of 1
•
BP EXPLORATION
Operations Summary Report
Page 1 of 9
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date From' - To Hours Task Code NPT Phase Description of Operations
8/1/2008 13:00 - 15:00 2.00 RIGD P PRE Scoped down and lowered derrick.
15:00 - 16:00 1.00 MOB P PRE Moved rig from B-27A to B-18.
16:00 - 18:00 2.00 MOB P PRE Laid Herculite. Spotted and bermed sub, pits, and pipe shed.
Spotted camp.
18:00 - 20:00 2.00 RIGU P PRE Raised and scoped derrick. ' ' ' Accepted rig at 19:00 hrs
8/1/2008. ' ' ' RU circulating lines to tree and tiger tank. Took
on hot seawater.
20:00 - 22:00 2.00 WHSUR P DECOMP RU DSM lubricator and tested to 500 si. Pull and RD
lubricator.
22:00 - 00:00 2.00 KILL P DECOMP Held crew change and performed pre-tour checks of PVT
system and derrick. Held Fire Drill. Tested circulating lines to
3500 psi. Displaced well with 588 bbls hot 8.5 ppg seawater.
Pumped 5 bpm, max circ pressure 1400 psi. Circulated out
estimated 30 bbls diesel.
8/2/2008 00:00 - 01:00 1.00 KILL P DECOMP Continued displacing well with hot 8.5 ppg seawater.
01:00 - 01:30 0.50 KILL DECOMP Shut down pump and monitored well. Tubing and annulus
dead and stable.
01:30 - 02:30 1.00 WHSUR P DECOMP Set TWC with T-Bar. Tested TWC from above to 3500 si for
10 charted minutes. Tested TWC from below to 1000 psi for
10 charted minutes.
02:30 - 05:00 2.50 WHSUR P DECOMP RD circulating lines. ND tree and adapter flange.
05:00 - 06:00 1.00 BOPSU P DECOMP NU BOPE.
06:00 - 08:30 2.50 BOPSU P DECOMP Held crew change. Serviced rig, checked PVT alarms.
Continued NU BODE. RU BOPE test equipment.
08:30 - 14:00 5.50 BOPSU P DECOMP Tested BOPE to 250 si low / 3500 si hi h per BP and
AOGCC requirements. Tested VBR with 3-1/2" and 5-1/2" test
joints. Tested annular with 3-1/2" test joint. BOPE test
witnessed by J. Crisp, AOGCC. RD BOPE test equipment.
14:00 - 16:00 2.00 WHSUR N WAIT DECOMP Waited on DSM for lubricator to pull TWC.
16:00 - 17:00 1.00 WHSUR P DECOMP RU DSM lubricator and tested to 500 psi. Pulled TWC and RD
lubricator.
17:00 - 18:00 1.00 WHSUR P DECOMP MU landing joint with XO to 7" IJ4S pin. Screwed in to tubing
hanger. BOLDS. Pulled tubing hanger free with 140k Ib PU.
LD tubing hanger.
18:00 - 20:00 2.00 PULL P DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. MU head pin and RU to circulate.
Circulated 535 bbls seawater around from just above tubing cut
depth. Required 16 bbls to fill well, then lost 4 bbls during
circulation. Pumped 5 bpm and 150 psi. Shut down and
monitored well; well stable.
20:00 - 00:00 4.00 PULL P DECOMP POH and LD 5-1/2" tubing. Spooled dual control lines and
braided cable. Used pneumatic chisel on control line clamps.
47 jts LD at 00:00 hrs.
8/3/2008 00:00 - 06:00 6.00 PULL P DECOMP Continued POH and LD 5-1/2" tubing. RD control line spooling
unit after jt #48. Recovered 23 plastic control line clamps and
5 ss bands. 135 jts LD at 05:00 hrs.
06:00 - 06:30 0.50 PULL P DECOMP Crew change. Service Rig. Check PVT alarms. Inspect
Derrick.
06:30 - 09:30 3.00 PULL P DECOMP Finish laying down 5 1/2" completion. Recovered 179 Jts 5
1/2" Tubing, SSSV, 13 GLMs, SS, and a 9.24-ft jet cut stub.
Jut cut flare =normal. Clean and clean floor.
09:30 - 10:30 1.00 PULL P DECOMP Hold weekly safety meeting with Crew, TP, and WSL.
10:30 - 11:30 1.00 CLEAN P DECOMP Install Wear Bushing (ID = 9 1/8"). Bring BHA tools to Pipe
Printed: 9/2/2008 11:47:36 AM
BP EXPLORATION Page 2 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18
Event Name: WORKOVER
Contractor Name: NABOBS ALASKA DRILLING
Rig Name: NABOBS 4ES
Date From - To Hours Task Code NPT
8/3/2008 10:30 - 11:30 1.00 CLEAN P
11:30 - 14:00 2.50 CLEAN P
14:00 - 16:00 2.00 CLEAN P
16:00 - 17:30 1.50 CLEAN P
17:30 - 18:00 0.50 CLEAN P
18:00 - 21:00 3.00 CLEAN P
21:00 - 22:00 1.00 CLEAN P
22:00 - 22:30 0.50 CLEAN P
22:30 - 00:00 1.50 CLEAN P
8/4/2008 00:00 - 02:30 2.50 GLEAN P
02:30 - 05:30 3.00 CLEAN P
05:30 - 06:00 0.50 CLEAN P
06:00 - 07:00 1.00 CLEAN P
07:00 - 08:00 1.00 CLEAN P
08:00 - 09:00 1.00 EVAL P
09:00 - 14:00 5.00 EVAL P
14:00 - 14:30 0.50 EVAL P
14:30 - 16:00 1.50 EVAL P
Spud Date: 5/11 /1982
Start: 8/1 /2008 End: 8/14/2008
Rig Release: 8/14/2008
Rig Number:
Phase Description of Operations
DECOMP Shed. Rig up to handle BHA.
DECOMP Make up BHA #1 as follows: 8 1/2" x 5.625" Dress-Off Shoe, 3
ea WP EM (16-ft swallow), (4 7/8" Tbg Dress Mill up inside
WP), Washover Boot Basket, XO, 9 5/8" Casing scraper, Bit
Sub, Bumper Jar, XO, 6 ea 6 1/4" drill Collars, XO,
Pump-Out-Sub.
DECOMP RIH with BHA #1 and single in with 3 1/2" drill Pipe from Pipe
Shed. Stop with 73 joints picked up.
DECOMP PJSM. Cut and slip Drilling Line (84').
DECOMP Resumed RIH with BHA #1, picking up 3-1/2" DP.
DECOMP Held crew change and performed pre-tour checks of PVT
system and derrick. Continued RIH with BHA #1.
DECOMP Held weekly safety meeting with all rig personnel. Discussed
Safety Alerts, recent incidents, rig ops performance, and
individuals' concerns.
DECOMP Continued RIH with BHA #1.
DECOMP Ta ed 5-1/2" tubin stub 7 '. PU kelly and established
parameters: PU 140k Ib, SO 125k Ib, Rot 133k Ib, 60 rpm,
130a, 2900 Ib-ft, 4 bpm, 515 psi, 1-3k Ib WOB. Rotated and
milled over stub with shoe. Continued rotating over stub,
swallowed 18'. Increased WOB to 5k Ib. Dressed 1' to mill
de th of 7926'. Shoe depth 7944'. PU above stub and made
two unrestricted passes to mill depth of 7926', with and without
rotation.
DECOMP Pumped 40 bbl high-vis sweep. Reverse circulated around
until clean returns. Sand, metal and rubber pieces in returns.
Pumped total of 640 bbls at 4 bpm and 1100 psi.
DECOMP POH with dress-off BHA #1, standing back 3-1/2" DP.
DECOMP Lay down BHA #1. Stop for Crew change.
DECOMP Crew change. Check PVT alarms. Inspect Derrick. Spot
SWS E-line Unit.
DECOMP Lay down BHA #1.
TIEB1 PJSM. Rig up SWS E-Line equipment and tools.
TIEB1 RIH with USIT to in suite. Log well from 4,050' back to
surface. Field TOC pick at 2,150'. Rig down SWS. Send log
results to Anchorage Engineer.
TIE61 Pick-up Halco Running Tool and 9 5/8" RBP.
TIEB1 RIH with RBP and 3 1/2" Drill Pipe. Set RBP with the center
element at 2.150'. Top of RBP at 2.145'.
16:00 - 16:30 0.50 EVAL P TIEB1 Pressure test RBP at 1 000 six 10 minutes. Record on chart.
16:30 - 18:00 1.50 EVAL N HMAN TIEB1 Dumped 25 sk 20/40 mesh sand on RBP. Discovered error in
RBP setting depth; RBP inadvertently set 100' high at 2150'.
18:00 - 18:30 0.50 EVAL N HMAN TIEB1 Held crew change and performed pre-tour checks of PVT
system and derrick. Reverse circulated and washed sand
2093' - 2145' (TOFN). Reversed 130 bbls seawater at 5 bpm
and 370 psi, until clean returns.
18:30 - 19:30 1.00 EVAL N HMAN TIEB1 Engaged 9-5/8" RBP at 2145'. Released RBP. RIH 2 stands,
reset at 2250 COE 2245' TOFN. Released from RBP
and POH 2 stands.
19:30 - 23:30 4.00 EVAL P TIE61 Pressure tested 9-5/8" RBP to 1000 si for 10 charted minutes.
Good test. Dumped 44 sk 20/40 mesh sand dawo_3-1/2" DP
and allowed to settle on RBP. Cleared drill pipe with 15 bbls
seawater. RIH and tagged sand at 2198' DPM.
Printed: 9/2/2008 11:47:36 AM
• •
BP EXPLORATION Page 3 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date From - To III Hours '.Task Code's NPT II Phase ~ Description of Operations
8/4/2008 23:30 - 00:00 0.50 EVAL P TIEB1 POH with RBP setting tool, standing back 3-1/2" DP.
8/5/2008 00:00 - 01:00 1.00 EVAL P TIEB1 Continued POH with RBP setting tool. LD setting tool and
cleared floor.
01:00 - 04:00 3.00 EVAL P TIEB1 PU 9-5/8" casin cutter BHA #2: multi-string cutter, stabilizer,
XOs, 6 x DC. Blade retaining wire repositioned on cutter and
blades duct taped to prevent premature blade extension. RIH
on 22 stands 3-1/2" DP. Pumped 3-1/2 bpm to extend blades.
Located casing joint gaps at 2097' and 2136'. Placed cutter
blades at 2120' DPM nd established parameters: PU 54k Ib,
SO 54k Ib, Rot 53k Ib, 60 rpm, 60 a, 1100 Ib-ft, 3-1/2 bpm, 100
psi. Increased pump rate to 5-1/2 bpm and 800 psi. Torque
increased to 150 a, 3000 Ib-ft, and lost 300 psi pressure after
about 10 minutes rotation. Continued rotation for 15 additional
minutes. Stopped rotation and reciprocated cutter to confirm
cut.
04:00 - 06:00 2.00 CASE P TIEB1 RU to take returns from OA. Attempted to establish circulation
throw h cut and u OA immediate) observed fluid retur into
well cellar. Shut down pump, fluid returns continued into cellar.
Positioned vac truck to evacuate cellar. Began pumping OA
fluid from cellar; fluid returns stopped.
06:00 - 07:00 1.00 CASE P TIE61 Crew change. Service Rig. Inspect Derick. Check PVT
alarms. Re-position Lil' Red Hot Oil Unit. Off-load second Vac
Truck with hot 9.8 Brine in Pits.
07:00 - 16:30 9.50 CASE P TIEBi LRS start 140 deg diesel at 1 bpm. fluid returns in cellar after
13 bbls pumped. Continue at 1 bpm and allow returns to
stabilize in cellar. Starting to get returns from OA in
containment tank. Had to reduce rate to 0.5 bpm several time
when cellar returns started to getting gas-cut. Shut down
diesel with 70 bbls pumped. Start hot 9.8 Ib/gal Brine with Rig
Pump at 1.0 bpm. Tried to increase rate to 1.5 bpm several
times. However celar returns still gas cut. Returns = 60%
cellar, 40% containment tank. End 9.8 Ib/gal Brine with 50 bbls
pump. Pump a 20 bbl 9.8 Ib/gal Hi-Vis pill. Shut down and let
hot fluids soak. Total bbls pumped = 140. Total bbls
recovered 160. Returns =thin Arctic Pack, diesel, and a brown
colored fluid. Resume circulations. Second Vac Truck on
location. Put two Vac trucks on cellar. Bring Rig Pump on line
with hot 9.8 Ib/gal Brine at 1 bbl/min. Returns in cellar after 2.5
bbls pumped. Walk rate up to 6.0 bpm/900 psi. Pump a total
of 140 bbls 9.8 Ib/gal Brine. Shut down and let hot Brine soak.
Recovered thin Arctic Pack, Diesel, brown fluid, Brine.
Pumped 140 bbls recovered 150 bbls. Returns 70
containment tank, 30% Vac Trucks. Resume circulations.
Bring LRS on with 140 deg Diesel at 1.5 bpm. End diesel with
50 bbls pumped. Bring Rig pump on line and pump a 20 bbl
9.8 Ib/gal Hi-Vis pill. Displace diesel and Hi-Vis pill with 140
bbls of 9.8 Ib/gal Brine at 5.0 bpm/750 psi. Returns =diesel,
thin Arctic Pack, dirty brine.
16:30 - 18:00 1.50 CASE P TIE61 Close OA Valve. Open Hydril. Circulate bottoms up with 9.8
Ib/gal Brine and take Sea Water returns to Tiger Tank.
18:00 - 20:30 2.50 CASE P TIE61 Held crew change and performed pre-tour checks of PVT
system and derrick. POH with casing cutter BHA #2, standing.
back 3-1/2" DP and 6~x DC. LD BHA #2. Pulled wear ring,
Printed: 9/2/2008 11:47:36 AM
•
BP EXPLORATION
Operations Summary Report
Page 4 of 9
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABORS 4ES Rig Number:
Date From - To Hours ~ Task Code NPT Phase Description of Operations
8/5/2008 18:00 - 20:30 2.50 CASE P TIEB1 cleared rig floor.
20:30 - 22:30 2.00 CASE P TIE61 MU 9-5/8" casing spear ass'y and stood back in derrick. RU
casing handling equipment.
22:30 - 00:00 1.50 CASE N WAIT TIE61 Waited for delivery of 9.8 ppg brine.
8/6/2008 00:00 - 02:00 2.00 CASE N WAIT TIEB1 Continued waiting for delivery of 9.8 ppg brine.
02:00 - 03:30 1.50 CASE P TIEB1 Loaded 9.8 ppg brine in pits.
03:30 - 06:00 2.50 WHSUR P TIE61 RIH, speared casing hanger and set grapple. BOLDS on
casing hanger. PU 225k Ib, casing hanger would not come
free. Wrapped and steamed wellhead. Continued pulling with
max PU 260k Ib.
06:00 - 06:30 0.50 WHSUR P TIE61 Crew change. Inspect Derrick. Service Rig. Check PVT
alarms. Continue to monitor cellar.
06:30 - 07:30 1.00 WHSUR P TIEB1 Continue to wotk to pull 9 5/8" Casino Hanoer free. Dead gull
07:30 - 09:30 2.00 WHSUR C TIEB1 Lay down Spear assembly. Pick up pick-up pack-off release
tool. Attempted to pull 9 5/8" pack-off. Worked to pull pack-off
free. Pull up to 80K per Cameron Rep. No joy. End steaming
Wellhead. Cameron Rep pulled all lock down pins one at a
time to inspect for broken pins. None were found. Pins were
re-installed in the correct "backed out" position.
09:30 - 10:00 0.50 WHSUR C TIE61 Submit and discuss plan forward to jar hanger free with
Anchorage Eng.
10:00 - 11:30 1.50 WHSUR C TIE61 PJSM. Make u surface 'ar tool strin as f II :Casing
Spear, Oil Jar, 1 ea 6 1/4" Drill Collar, Accelerator Jar, 3 1/2"
Drill Pipe Pup Joint (S-135 Grade), TIW Valve.
11:30 - 16:00 4.50 WHSUR C TIEB1 Plant Casing Spear. Begin jarring to free Casing hanger.
Tripping jars at 50K and work up to 90K to un-seat Hanoer. No
'our. Discuss higherjaring parameters with Anch Eng.
C ntinue to tri 'ors to un-seat Han er at 10 K d rk to
150K. Han er remains stuck Total 'ar licks = 210.
Accelerator Jar starting to leak. Stop further jarring. Inspect
Derrick. Discuss next option with Anch Eng.
16:00 - 17:00 1.00 WHSUR C TIEB1 Disengaged spear. LD spear ass'y. Discovered bull nose off
casings ear lost in hole. Lost " OD x 1.33' Ion .
17:00 - 18:00 1.00 BOPSU C TIE61 Waited for instructions.
18:00 - 18:30 0.50 BOPSU C TIE61 Held crew change and performed pre-tour checks of PVT
system. Re-inspected derrick, continued waiting for
instructions.
18:30 - 23:00 4.50 BOPSU C TIEBi Split stack below tubing spool. PU stack, 9-5/8" casing
pack-off lifted with spool. Set stack down, ND BOPE from top
of tubing spool. Set back BOPE. Removed old tubing spool
with pack-off and replaced with new spool without pack-off. Set
test plug in tubing spool. Notified AOGCC at 22:15 hrs of
upcoming BOPE body test. C. Scheve (AOGCC) waived test
witness.
23:00 - 00:00 1.00 BOPSU C TIEB1 NU BOPE.
8/7/2008 00:00 - 00:30 0.50 BOPSU C TIEB1 Continued NU BOPE.
00:30 - 02:30 2.00 BOPSU C TIEB1 Tested BOPE break to 250 psi low / 3500 psi high. Discovered
pinhole-sized leak in mud line. About 1/2 gal 9.8 ppg brine
leaked to secondary containment. Made all Level '0'
notifications. Traction No. 2008-IR-2741334. Pulled test plug.
02:30 - 04:00 1.50 WHSUR C TIEB1 MU 9-5/8" casing spear. Engaged grapple. Pulled casing
hanger to rig floor with 102k Ib PU.
Printed: 9/2/2008 11:47:36 AM
BP EXPLORATfON Page 5 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABORS 4ES Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
8/7/2008 04:00 - 06:00 2.00 CASE C TIE61 Disengaged and LD spear. Broke out and LD casing hanger
06:00 - 06:30 0.50 CASE P TIE61
06:30 - 16:00 9.50 CASE P TIEB1
16:00 - 16:30 0.50 CASE P TIEB1
16:30 - 18:00 1.50 CASE P TIEB1
18:00 - 19:30 1.50 FISH N DPRB TIEB1
19:30 - 21:30 I 2.001 FISH I N I DPRB I TIEB1
8/8/2008
21:30 - 23:00 I 1.501 FISH I N I DPRB I TIE61
23:00 - 00:00 1.00 FISH N DPRB TIEB1
00:00 - 01:30 1.50 FISH N DPRB TIEBi
01:30 - 03:30 2.00 FISH N DPRB TIEB1
03:30 - 04:00 0.50 FISH N DPRB TIE61
04:00 - 06:00 2.00 FISH N DPRB TIE61
06:00 - 06:30 0.50 FISH N DPRB TIEB1
06:30 - 08:00 1.50 FISH N DPRB TIEB1
08:00 - 08:30 0.50 FISH N DPRB TIEB1
08:30 - 09:30 1.00 FISH N DPRB TIEBi
09:30 - 10:00 0.50 FISH N DPRB TIEB1
10:00 - 11:30 1.50 FISH N DPRB TIEBi
11:30 - 13:00 1.50 CASE P TIEB1
13:00 - 14:30 I 1.501 CASE I P I ITIEBI
14:30 - 16:00 I 1.501 CASE I P I I TIE61
16:00 - 18:15 I 2.251 CASE I P I ITIEBI
No visible marks on hanger. RU 9-5/8" casing handling
equipment.
Crew change. Service Rig. Inspect Derrick. Test PVT alarms.
Maintain watch on cellar.
Lav down 9 5/8. 47 Ib/ft. L-80. BTC Casino. Recovered 53
'oi inta and a 26.40' cut-off stub. Cut was "texbook".
Rig down casing handling equipment.
Clear and clean floor.
Held crew change and performed pre-tour checks of PVT
system and derrick. PU fishing magnet BHA #3: 8" cut lip
magnet, bit sub, bumper jar, XO, POS.
RIH with BHA #3 on 23 stands 3-1/2" DP. Tagged 9-5/8"
casing stub at 2120'. Manually rotated into stub. Had fluid
returns to well cellar. PU kelly. PU/SO/Rot 43k/43k/43k, 20
rpm, 45a, 900 Ib-ft. Tagged fish at 2196', SO 5k Ib.
POH with fishing magnet BHA #3. No recovery. LD magnet
ass'y.
PU RCJB BHA #4: RCJB, bit sub, bumper jar, X0, POS.
RIH with RCJB BHA #4 on 3-1/2" DP. Continuing to take fluid
returns to cellar. Evacuating cellar with vac truck.
Repaired mud pump fluid end seal.
Tagged fish or sand top at 2196'. Dropped ball, rotated and
washed to 2203'. Pumped 6 bpm at 800 psi, rotated 90a, 1900
Ib-ft.
POH with RCJB BHA #4. LD BHA #4, cleared RCJB, no
recove .discuss plan forward with Anch Eng.
Crew change. Service Rig. Inspect Derrick, Check PVT
alarms. Maintain cellar watch.
Re-run BHA #4. RIH with RCJB. PUW = 43K. SOW = 43K.
Amps = 60. RPMs = 52. Pick up Kelly. RWT = 45K.
Wash and rotate down to TOS at 2,204-ft. Reduce pump rate
to 0.5 bpm. Rotate into sand down to 2,209'. Stalled out and
pressured up. Pulled free. Back surge pressure from Drill
Pipe. Pull up hole . Re-establish circulations.
POOH. Break down RCJB. Fish recovered complete.
Lay down BHA #4.
Cler and clean rig floor.
Make-up BHA #5 as follows: 12" x 9 5/8" Dress-off shoe, W P
Ext, Csg Dress Mill (inside Ext), washover Boot Basket, XO 13
3/8" Casing scraper, XO, Bumper Jar, XO, float sub, 6 ea 6
1/4" Drill collars, XO.
TIH with BHA #5 and 3 1/2" Drill Pipe to 1150-ft. Mix and
pump a 40 bbls 9.8 Ib/gal Brine Hi-Vis sweep. Chase to
surface with 9.8 Brine. Returns to cellar via 13 3/8" x
Conductor continue.
Continue to TIH. Pick-up Kelly. RTW =55K, Amps = 90, Pump
Rate = 3.5 bpm/150 psi. Tag top of 9 5/8" stum at 2 120-ft.
Dressed off top of Casing to 2,121- wallowed 8-ft down to
2,129-ft. Returns in Cellar bridged-off and quit.
Circulate and condition well bore. Mix and pump 20 bbl 9.8
Ib/gal Brine Hi-Vis pill. Swap over to hot 1 %KCL Water. Mix a
40 bbl Safe-Surf-O pill and chase to surface with hot 1 %KCL
Printed: 9/2/2008 11:47:36 AM
•
BP EXPLORATION Page 6 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date From - To I' Hours Task Code I NPT Phase I' Description of Operations
8/8/2008 16:00 - 18:15 2.25 CASE P TIE61 Water until well cleaned up.
18:15 - 20:30 2.25 CASE P TIE61 Held crew change and performed pre-tour checks of PVT
system and derrick. POH with dress-off BHA #5, standing
back 3-1/2" DP.
20:30 - 22:00 1.50 CASE P TIE61 Stood back DC. LD BHA #5. Cleared boot basket.
22:00 - 23:30 1.50 CASE P TIEB1 Cleared and cleaned rig floor of Arctic Pack solids.
23:30 - 00:00 0.50 CASE P TIEB1 PUMU 13-3/8" RTTS.
8/9/2008 00:00 - 02:00 2.00 CASE P TIEB1 RIH with 13-3/8" RTTS on 20 stands + single 3-1/2" DP.
02:00 - 04:00 2.00 CASE P TIEB1 Set RTTS at 2113' COE. RU head pin and line. Tested
13-3/8" casina shoe to 2000 psi for 30 charted minutes.
04:00 - 06:00 2.00 CASE P
06:00 - 06:30 0.50 CASE P
06:30 - 07:00 0.50 BOPSUFj P
07:00 - 13:30 6.50 BOPSU P
13:30 - 14:00 0.50 BOPSUF~ P
14:00 - 15:00 1.00 CASE P
15:00 - 18:00 3.00 CASE P
18:00 - 22:00 4.00 CASE P
22:00 - 00:00 2.00 CASE ~ P
8/10/2008 100:00 - 01:30 I 1.50 I CEMT I P
01:30 - 02:30 I 1.00 I CEMT I P
02:30 - 04:30 I 2.001 CEMT I P
Pressure ell about 200 psi in 20 minutes. RD pump-in line and
head pin. Unset RTTS.
TIEB1 POH with RTTS, standing back 3-1/2" DP. LD RTTS.,
TIE61 Crew change. Service rig, Inspect derrick. Check PVT
alarms. Maintain cellar watch.
TIEB1 Install test plug. RILDS.
TIE61 Rig up test equipment. Test BOPE per BP/AOGCC
requirements at 250/3500 psi. Tested VBPRs with 3 1/2" and 4
1/2" Test Joints. Tested Hy-Dril with 3 1/2" Test Joint. State's
right to witness test was waived by C. Scheve 18:45 hrs
8/7/2008.
TIE61 BOLDS. Pull Test Plug.
TIE61 Rig up to handle 9 5/8" Casing. Rig up Torque Turn
equipment.
TIEB1 Run 9 5/8" Casin as follows 9 5/8" Bowen Casing Patch, Pup
Joint, Halco ES Stage Cementer, XO Joint, 53 Jts 9 5/8" 47
bl/ft L-80 Hydril 563 Cond B Casing. Baker-Lok ES Cementer
threads.
TIE61 Continued RIH with 9-5/8" 47# L-80 Hydril 563 tieback casing.
Ran total of 53 jts and 52 centralizers. PU 98k Ib, SO 96k Ib.
Slowly rotated over and engaged overshot. Bottomed out on
casing stub and SO 25k Ib. PU 30k Ib over neutral to set
grapple. PU total of 250k Ib to confirm set. SO to 200k Ib,
holding 100k overpull tension.
TIE61 RD casing handling equipment. RU cementing head and lines.
Pressure tested 9-5/8" tieback to 2000 psi for 30 charted
minutes. Good test. Increased pressure to 2600 psi to shear
open ES cementer. Established circulation through cementer
ports with warm 1 %KCI brine, at 5 bpm and 125 psi.
TIEB1 Moved in and spotted SWS cementing equipment. Spotted
vac trucks for fluid and returns. Laid and MU cementing lines.
Circulated 1 %KCI through ES cementer to warm wellbore.
TIEB1 Held pre-cementing safety meeting with all rig personnel and
contractors. Continued RU cementing equipment.
TIE61 Tested cement lines to 4000 psi. Cemented 9-5/8" tieback
casing with 155 bbls CI G cement + additives. Pump pressure
370 - 350 psi while pumping cement at 5 bpm. Released plug,
saw tattle tale move. SWS displaced cement with 1%KCI
brine at 5 bpm. Caught cement at 65 bbls displacement.
Began getting cement returns to cellar at 115 bbls
displacement. Max displacement pressure 1055 psi. At 145
bbls displacement reduced pump rate to 2 bpm and pressure
to 875 psi. Reduced OA valve opening to force good cement
Printed: 9/2/2008 11:47:36 AM
• •
BP EXPLORATION Page 7 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABORS 4ES Rig Number:
Date From - To Hours ! Task Code NPT Phase Description of Operations
8/10/2008 02:30 - 04:30 2.00 CEMT P TIEB1
04:30 - 06:00 I 1.501 CEMT I P
06:00 - 07:00 1.001 WHSUR P
07:00 - 09:00 2.00 CASE P
09:00 - 12:00 3.00 WHSUR P
12:00 - 14:00 2.00 BOPSU P
14:00 - 15:00 1.00 CASE P
15:00 - 15:30 0.50 CASE P
15:30 - 18:00 2.50 CASE P
18:00 - 19:30 1.50 DRILL P
19:30 - 21:00
21:00 - 22:00
22:00 - 00:00
8/11/2008 00:00 - 00:30
00:30 - 01:30
01:30 - 02:30
02:30 - 04:00
1.50 DRILL P
1.00 DRILL P
2.00 CASE P
0.50 CASE P
1.00 CASE P
1.00 CASE P
1.50 CASE P
TIEB1
TIEB1
TIEB1
TIEBi
TIEB1
TIE61
TIE61
TIE61
TIE61
TIE61
TIE61
TIEB1
TIEB1
TIEB1
TIE61
TIEB1
into conductor annulus and cellar. Reduced pump rate to 1
bpm, had about 15 bbls uncontaminated cement returned to
cellar. Bumped plug at 159.5 bbls displacement (4.5 bbls over
calculated volume) and increased pressure to 2500 psi. Held
pressure for 5 minutes. Released pressure, bled 1-1/2 bbls
back to cementers. CIP at 04:00 hrs.
Blew down cementing lines. Sucked out BOPE. RD
cementing equipment. Collected all cellar and catch tank fluids
for disposal.
Crew change. (Cement top seen in the 13 3/8" x Conductor
Annulus at surface. Unable to see cement top in the 9 5 8" x
13 3/8" Annulus). fipple down Choke and Kill Lines. Pick-up
BOP Stack and Spool. Install slips and set with 100k tension.
Rig up WACHS cutter. Cut 9 5/8" Casing per Cameron Rep.
Rig down cutter. Lay down a 17.14' 9 5/8" Casing stub.
Install new 9 5/8" Pack-Off. RILDS. Nipple up Spool and BOP
Stack. Test Spool void at 3,800 psi x 30 minutes. Good test.
(Compressive strength of the cement at 11:15 hrs = 301 psi)
Install test plug. Fill stack. Rig up test equipment. Body test
BOP stack at 250/3,500 psi per BP/AOGCC requirements,
Record on chart. State's right to witness test was waived by C.
Scheve. Pull test plug. Install Wear Bushing.
Hold Weekly Sunday Safety Meeting with all.
Pick-up BHA #6 as follows: 8 1/2" Blt, 2 ea Boot Baskets, Bit
sub, Oil Jar, XO, 6 ea 6 1/4" drill Collars, XO, Pump-Out- Sub.
(Compressive strength of cement at 15:30 hrs = 693 psi).
TIH with BHA #6 and 3 1/2" drill Pipe. Pick-up Kelly.
Parameters as follows: PU/SO/Rot 55k/55k/55k, 60a, 1100
Ib-ft, 50 rpm, 3 bpm, 100 psi. Tagged cement at 2104'.
Held crew change and performed pre-tour checks of PVT
system and derrick. Drilled cement 2104' - 2127'. WOB 5k-6k
Ib. Pumped 3-1/2 bpm, 140 psi. Rotated up to 84 rpm, 80a,
1900 Ib-ft.
PU 3 singles. Rotated and washed 2127' to hard sand at
2206'. Pumped 3-1/2 bpm, 150 psi.
Dry drilled on hard sand 2206' - 2208'. Pumped 40 bbl high-vis
sweep around and reciprocated pipe. Had sand, cement and
metal shavings in returns. Pumped 6 bpm and 400 psi.
Closed VBR. Pressured up to 3500 psi to test tieback.
Discovered pinhole sized leak in mud line. Bled pressure.
About 5 gallons 1 % KCI brine released to secondary
containment. Made all Level '0' notifications and cleaned up
leaked fluid. Traction No. 2744644. Polar bear made way onto
pad, then moved off toward CPS, attracting quite a bit of
attention and traffic along the way.
Resumed test of 9-5/8" tieback to 3500 psi for 30 charted
minutes. Good test.
Held weekly safety meeting with night rig personnel.
Discussed recent incidents, STOP cards, and rig performance.
POH with drill-out BHA #6, standing back 3-1/2" DP. Stood
back drill collars.
LD BHA #6. Cleared junk basket. Cleared and cleaned rig
Printed: 9/2/2008 11:47:36 AM
• •
BP EXPLORATION Page 8 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABOBS ALASKA DRI LLING I Rig Release: 8/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date ;From - To Hours Task- Code NPT Phase , Description of Operations
8/11/2008 02:30 - 04:00 1.50 CASE P TIEB1 floor.
04:00 - 06:00 2.00 CASE P TIEB1 PU RCJB BHA #7: RCJB, boot baskets, 9-5/8" scraper, bit
sub, oil jar, XO, 6 x DC, XO, POS.
06:00 - 07:00 1.00 CASE P TIEB1 Crew change. Service Rig. Inspect Derrick. Check PVT
Alarms.
07:00 - 07:30 0.50 CASE P TIE61 TIH with BHA #7 RCJB #1 and 3 1/2" Drill Pipe.
07:30 - 09:00 1.50 CASE P TIEB1 Pick-up Kelly. PUW = 55K, SOW = 55K, RTW = 56K, Amps =
80, RPMs = 64. Tag Top of sand at 2,208'. Wash and rotate
09:00 - 10:30 1.50 CASE P
10:30 - 11:30 1.00 CASE P
11:30 - 12:30 1.00 CASE P
12:30 - 13:30 1.00 CASE P
13:30 - 14:00 0.50 CASE P
14:00 - 15:00 1.00 CASE P
15:00 - 18:00 I 3.001 CASE I P
18:00 - 20:00 2.00 CASE P
20:00 - 22:00 I 2.00 I CASE I P
22:00 - 00:00 2.00 CASE P
8/12/2008 00:00 - 01:00 1.00 CASE P
01:00 - 03:30 2.50 CLEAN P
03:30 - 06:00 2.50 CLEAN P
06:00 - 06:30 0.50 CLEAN P
06:30 - 09:00 2.50 CLEAN P
09:00 - 12:30 3.50 CLEAN P
12:30 - 20:30 8.00 CLEAN P
20:30 - 22:30 2.00 CLEAN P
22:30 - 00:00 1.50 CLEAN P
8/13/2008 00:00 - 02:00 2.00 BUNCO
TIE61 Set back Kelly. Start Trip out. Tubing still plugged. Drop ball
and open pump-out sub. Continue TOH.
TIEB1 .Lay down RCJB and Boot Baskets and clean out. Recovered
several pieces of cast, brass, and rubber. Also cleaned out
gummed-up sand.
TIEB1 Clean flo d make u RCJB for run #2 BHA #8).
TIE61 Trip in with RCJB #2 and 3 1/2" Drill Pipe.
TIEB1 Pick-up Kelly and tag top of sand at 2,210'. Wash and rotate
down to 2,230'.
TIE61 Reverse in with a 20 bbls Hi-Vis sweep. Reverse circulate ar
4.6 bpm/1500 psi. Recovered much 20/40 mesh sand and a
few bit of rubber.
TIE61 POH with RCJB BHA #8. Stood back 3-1/2" DP and DC. LD
BHA and cleared boot baskets. Recovered few metal and
rubber pieces.
TIEB1 Held crew change and performed pre-tour checks of PVT
equipment and derrick. Cleared rig floor. PU RBP retrieving
tool. RIH on 23 stands + double 3-1/2" DP.
TIEB1 MU head pin and closed annular. Reverse circulated and
washed 2233' - 2245'. Reversed around 20 bbl high-vis sweep.
Some Arctic Pack in returns. Pumped 5 bpm and 700 psi.
Held Fire Drill in pits.
TIEB1 PU/SO 40k/40k. Engaged RBP at 2245'. PU 35k Ib over string
weight to release RBP. CBU from 2245' at 5 bpm and 350 psi.
POH with RBP on 3-1/2" DP.
TIE61 BO and LD 9-5/8" RBP. Cleared rig floor.
DECOMP RU to handle 2-7/8" PAC DP and shear-out guide. PU tubing
slug mill BHA #9; 3-5/8" mill, shoe, TSWP bushing, shear
guide, 8 x PAC DP, XOs, boot baskets, bit sub, bumper jar, oil
jar, XO, 6 x DC, XO, POS.
DECOMP RIH with tubing plug mill BHA #9 on 3-1/2" DP.
DECOMP Crew change. Rig service. Inspect Derrick. Check PVT
alarms.
DECOMP Cont RIH w/ BHA. Tag fill ~ 7986'.
DECOMP Rotate & mill from 7986' to 8030'. Cont to push 3 5/8" mill thru
4 1/2" tail to 8156'. PUW = 139K, SOW = 125K. Rotate ~
4000 ft-Ibs, 53 RPM, WOB = 3-5K. Pump rate 3 BPM ~ 521
psi. Nothing over shakers while milling. Well went on vac.
Maintain continuous hole fill ~ 60 bbls/hr.
DECOMP POH. LDDP while maintaining 60 bbl/hr.
DECOMP L/D PAC pipe & BHA. Recovered 3 gallons of sand and fine
fibers.
DECOMP Clear rig floor. Pull wear ring. R/D drill pipe equipment.
RUNCMP R/U 4 1/2" chrome completion equipment.
Printed: 9/2/2008 11:47:36 AM
•
BP EXPLORATION Page 9 of 9
Operations Summary Report
Legal Well Name: B-18
Common Well Name: B-18 Spud Date: 5/11/1982
Event Name: WORKOVER Start: 8/1/2008 End: 8/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 8/14/2008
Rig Name: NABOBS 4ES Rig Number:
i
Date From - To 'Hours Task I'I Code ~, NPT I' Phase Description of Operations
8/13/2008 02:00 - 06:00 4.00 BUNCO RUNCMP PJSM with all crews. MU &RIH w/ 4 1/2" 13Cr80 Vam-Top
completion. MU torque = 4440 ft-Ibs. RIH w/ 25 jts. High winds
slowing stabbing of connections.
06:00 - 07:00 1.00 BUNCO RUNCMP Service Rig. Inspect derrick, check PVT alarms.
07:00 - 16:00 9.00 BUNCO RUNCMP Con't to RIH w/ 4 1/2" 12.6" 13Cr-80, Vam To tubin .Ran
total of 180 jts. P/U Wt = 106K, S/O Wt = 96K.
16:00 - 16:30 0.50 BUNCO RUNCMP P/U jt # 181 & go down over tubing stub. Saw shear pins go ~
6K over. Con't in stack out & P/U & re-verify taa C«~ 7932'.
P/U 2' & perform space out. MU 10' pup & install below Jt #
180. M/U landing jt & tubing hanger.
16:30 - 17:00 0.50 BUNCO RUNCMP Land TBG hanger. RILDS. LD landing joint.
17:00 - 19:00 2.00 BUNCO RUNCMP RD torque turn equipment. RU lines in cellar to reverse
circulate. Spot & RU brine trucks.
19:00 - 20:00 1.00 BUNCO RUNCMP C/O pop-off valve on mud pump -leaking by. Test to 3500 psi.
20:00 - 23:00 3.00 BUNCO RUNCMP Circulate inhibited seawater ~ 3 BPM / 50 psi. Circulated 490
bbls of inhibited seawater.
23:00 - 00:00 1.00 BUNCO RUNCMP Drop Ball & Rod. Pressure up on TBG. Gland nuts leaking.
C/O gland nut packing.
8/14/2008 00:00 - 02:30 2.50 BUNCO RUNCMP Set packer & test tubing to 3500 psi for 30 min. Bleed tubing to
500 psi. ressure to si or min.
sheared DCR ~ 2400 psi differential. Circulate thru port 3 BPM
both ways. Entire test charted.
02:30 - 03:00 0.50 BUNCO RUNCMP FMC dry rod TWC. Test above & below for 10 min -charted.
03:00 - 05:00 2.00 BOPSU P RUNCMP P M. 3 1 ' x 6" VBR to 2 7/8" x 5" VBR.
05:00 - 06:30 1.50 BOPSU P RUNCMP ND B E. Set BOP in cradle and secure. Noticed some
bubbles in the annulus
06:30 - 09:00 2.50 WHSUR P RUNCMP N/U adapter flange & X-mas tree. Pressure tested hanger void
to 5000 psi for 30 min. Filled & tested tree to 5000 psi.
09:00 - 10:00 1.00 WHSUR P RUNCMP P/U lubricator & test to 500 psi, Ok. Pull TWC, L/D TWC &
lubricator.
10:00 - 11:30 1.50 BUNCO RUNCMP R/U LRS & pressure test lines to 2500 psi. Pump down IA &
freeze protect well w/ 150 bbls of diesel. Pumped 2 BPM ~
350 psi.
11:30 - 12:30 1.00 BUNCO RUNCMP R/U & allow well to U-tube from IA to Tubing.
12:30 - 13:00 0.50 WHSUR P RUNCMP Install BPV w/ T-bar. Pressure test BPV w/ 1000 psi for 10 min.
Charted test.
13:00 - 14:00 1.00 WHSUR P RUNCMP Blow down & remove lines. Secure well & cellar. ELE~i ASE
RIG C~3 1400 hrs.
Printed: 9/2/2008 11:47:36 AM
08/25/08
\`
~~
.._ _~
~P5}~
+~e
~CII~~~~~~~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Wall .Inh ik
N0.4826
Company: State of Alaska
~"''`~~~y t+E~ ~ ~ +1{1~~ Alaska Oil & Gas Cons Comm
e~ea J LU Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Inn rlacrrin+inn n~fa RI (`nlnr !_rl
A-02 12086677 RST ~ - 0 ( 07/23/08 1 1
A-24 12034903 RST - 06/18/08 1 1
A-13 12086676 RST (~ 07/23/08 1 1
G-02A 11968945 RST ~ ~ 06/08/08 1 1
B-19A 12017500 RST / ~~ 06/14/08 1 1
15-18A 12005216 MCNL - ~ - 06/24/08 1 1
C-02 11982437 RST / ~ 06/19/08 1 1
X-14A 11978452 CH EDIT PDC-GR (MEMORY DDL) _ G / 04/21/08 1 1
B-37 12034907 CH EDIT PDC-GR 06/10/08 1
V-207 11999031 MDT aO~' 07/23/08 1 1
V-207 11999031 MDT QUICKLOOK "~ 07/23/08 1 1
V-210.- 12096908 MEM INJ PROFILE 08/08/08 1 1
L-116 12071885 SBHP SURVEY /(p 08/16/08 1 1
C-37A 12005221 MEMORY CBL (REVISED) - ~ Q 07/28!08 1 1
B-18 11978471 USIT _~ /(~ ~ ~ 08/04/08 1 1
05-31A 12057635 LDL '~ 6 07/21/08 1 1
13-29L1 11962614 LDL ~ ~ -d(~ / 07/30!08 1 1
13-29L1 11966271 USIT q /(p '~ 08/05/08 1 1
H-11 12017507 USIT 08/04/08 1 1
/-' w t
rLCAac A~.nrvvvvLeulle r{CVCIYI fib JWrvIrvU AIVU MtI UtS1V11V1a VIVt LVYT tAl:tt 1 U:
BP Exploration (Alaska) Inc. ` r ~, ~ ~. °~=~ x~,t
PetrotechnicalDataCenter LR2-1 ~ ~ ~~,,,„;
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered: ~~~~ '~ ~ ~~C~j
x, 1' sc,;
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503-283
ATTN: Beth
Received by:
~~
t~s V
07/23/08
~-^'_
Sch~mberg~r
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
sai~d~~ ~V l~'~ .s. .~~ LUUt~
wou _i..h ~
~ .... nse.. ...:,...
N0.4786
Company: State of Alaska
Alaska Oil & Gas Cons Gomm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
WB-05 12021166 MEM SBHPS / 06/13/08 1 1
G-16 1 9 2438 PRODUCTION P OFILE _ a~ a 06/21/08 1 1
R-12 12034908 PRODUCTION PROFILE _ ~?~ 07/14/08 1 1
01-03A 12017505 PRODUCTION PROFILE ~,.,~ ' ~(p 07/15/08 1 1
J-158 11970838 SCMT 07/17/08 1 1
01-23 12057631 PRODUCTION PROFILE 07/16/08 1 1
B-18 12071875 LDL G 07/20/08 1 1
4-04/T-26 11999025 LDL /
~ 07/12/08 1 1
J-14A 12066524 MCNL ~ p (- 05/25/08 1 1
G-15B 11963096 MCNL `p'-(~(p ' 05/30!08 1 1
L3-19 11968944 RST X65 - 06/07/08 1 1
L2-11 12014019 RST ~' 06/05/08 1 1
r~cnvc nvn,w ~~ccvVC 1'1cVClr 1 D7 ~71V1711Y\7 AIYY 11C1 Ur11Y11Y~7 V17C IiVYT CNCn 1 V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Alaska Data & Consulting Service
2525 Gambell Street, Suite 40
Anchorage, AK 99 3-2838
ATTN: Beth -s-~~._
Received by:
•
F "l S ~ s 6
p, ~~~, ,~
AI,ASSA OIL A1~TD GA5
COrTSERQATIOI~T CO~`II-II551O1~T
David Reem
Engineering Team Leader ~~~~~® ~ U ~ ~, ~ 2008
BP Exploration Alaska Inc. L~
SARAH PALlN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
PO Box 196612
Anchorage, AK 99519-6612 ~ ga,~ ~ D
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU B-18
Sundry Number: 308-230
Dear Mr. Reem:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehe ~g date of this 1 tterelor the next worlflng
4:30 PM on the 23rd day following
day if the 23rd day falls on a holida ~orCoeeuk~e unles s rehearing has been
a Commission decision to Supe
requested.
Sincerely,
~~
Daniel T. Seamount, Jr.
Chair
DATED this ~ day of J e, 2008
Encl.
~'-8 ~
„ ~ ~ %~~~` ~,~`~ STATE OF ALASKA
I O
~ti `~ ~~AL~A OIL AND GAS CONSERVATION COMMISSION ~ `t'its ~~~ ~ 0'
~° / ~~ APPLICATION FOR SUNDRY APPROVAL A1~~~~ ~~~ °, u~-:~ ~~ ~,,. ,a ,~~ ;;~
20 AAC 25.280 ~:°;;; :;
1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension
~ Alter Casing - ~ ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ,® Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 182-002 '
3. Address: ^ Service ^ Stratigraphic 6. API Number: -
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20702-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU B_~ $
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028310' 73.8'- Prudhoe Bay Field / Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
9410' ~ 9239' ' 9338' 9169' 8054' None
Casin Len th Size MD TVD Burst Colla se
Structural
Conductor 110' 20" x 30" 110' 110'
Surface 2696' 13-3/8" 2696' 2695' 4930 2670
Intermediate 8585' 9-5/8" 8585' 8445' 6870 4760
Prod ction
Liner 1325' 7" 8080' - 9405' 7962' - 9234' 7240 5410
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
Below Pluq: 9123' - 9198' 8962' - 9034' 5-1 /2", 17# x 4-1 /2", 12.6# L-80 8136'
Packers and SSSV Type: 9-518" x 5-1/2" Baker Packer Packers and SSSV MD (ft): 7993'
13. Attachments: 14. Well Class after proposed work:
~ Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: August 15, 2008 ®Oil ^ Gas ^ Plugged ^ Abandoned
17. Verbal Approval: Date:
^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Hank Baca, 564-5444
Printed Name vid Reem Title Engineering Team Leader
~ Prepared ey NamelNumber:
Signature ~ Phone 564-5743 Date 6 LE ,~~ Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number: ~~
Conditions of approval: Notify Commission so that a representative may witness
_
^Pluglntegrity ~OPTest ^MechanicallntegrityTest ^LocationClearance +~~'~~ ~'~- '~
~
~
~~`
)~
~
,
/4''L r" ~
Other: _~~~ s~c~~ +~~~v~,~~.~ a-~~~~ ~:5'~
Subsequent Form Required: ~`~
APPROVED BY '~
/
A roved B . COMMISSIONER THE COMMISSION Date
(((JJJ
Form 10-403 ReYiisq(i ~6%2006
',IGINAL
- ~ ~ ~xCJE_ ~ ~' 2~~~
Submit In Duplicate
by
cr,~,y
B-18 Rig Workover (Restore OA/IA integrity)
•
Scope of Work: Pull 5.5/4.5" L-80 completion, cut and pull 9 5/8" casing, tie-back w/ new 9-5/8" casing
(cemented to surface), replace 9 5/g" hanger and primary pack-off, and run 4.5" 13 Cr-80 completion.
Engineer: Hank Baca
MASP: 3231 psi
We11 Type: Producer
Estimated Start Date: August 15th, 2008
S 1 Pull P-prong and PX plug body at 8,054' MD. Drift past 7,950' for 5-1/2" Power Jet cutter and 5-
1/2" Fasdrill.
E 2 Set 5-1/2" Fasdrill at 7,950' MD (P/T to 1000 psi). If P/T passes, Power Jet cut tubing C~
7,945' (Ref: 5/26/82 tubing summary). Jet cut desired to be in the middle of the 1St full joint
above the aaker.
F 3 CMIT TxIA to 1000 psi for 30 minutes. Circulate well with seawater and FP w/ diesel thru the
cut. Bleed WHP's to 0 si.
O 4 PPPOT-T, -IC, check all LDS.
O 5 Set a BPV in the tubing hanger. Remove the wellhouse & flow line. Level the pad as needed
for the ri .
Proaosed Procedure
1. MIRU. ND tree. NU and test BOPE to 250 psi low/ 3500 psi high. Circulate out freeze protection
fluid and circulate well to clean seawater through the cut.
2. Pull and LD tubing string to the cut.
3. RU wireline and run USIT from cut to surface.
4. Run 9-5/8" RBP and set 100' below TOC determined from USIT. PT RBP to 1000 psi to prove plug
is set. Stack ~50 ft of sand on RBP.
5. Mechanically cut 9-5/8" casing in 1St full joint above top of cement. Pull casing thru stack. Dress-off 9-
5/g" stub in preparation of casing overshot. Note: VBR's will not be changed to 9-5/e" pipe rams as
the well has two tested barriers (Fasdrill ~ -7,950' MD and RBP) to the reservoir.
6. Run back in with new 9 5/8", 47#, L-80 casing and land on new emergency slips with new primary
pack-off. PT 9 5/$" pack-off to 3500 psi. Cement new 9 5/$" casing to surface
7. Cleanout above 9 5/a" RBP. Pull 9 5/" RBP.
8. Fish/mill up remaining 5.5" & 4.5" tubing. Packer at 7993', 4.5" tubing tail C~ 8136'
9. Run 4-~/z" 13Cr-80 completion with Baker S-3 packer.
10. Displace the IA to packer fluid and set the packer.
11. Test tubing and IA to 3500 psi. Freeze protect to 2,200' MD.
12. Set TWC. ND BOPE. NU and test tree. Pull TWC and set BPV. RDMO.
TREE = 6"
IWELLHEAD= MCEVOY
'ACTUATOR= OTIS
KB. EL(=l/ = 73.75'
BF. ELEV = 45.3'
KOP = 5900'
Max Angle = 22@ 6500'
Datum MD = 9032'
Datum TV D= 8800' SS
- ~ ~ S NOTES:
20'CONDUCTOR 110'
2040' S-1/2" OTIS SSSV LANDING NIP, ID = 4.562"
GAS LIFT MANDRELS
13-3/8" CSG, 72#, L80, ID = 12.347" ~~ 2f
Minimum ID = 3.725" @ 8094'
4-112" OTIS 'XN' NIPPLE
ST MD TVD DEV TYPE VLV LATCH PORT DATE
13 3113 3039 0 OTIS DOME RM 16 02/04/06
12 4486 4412 1 OTIS SO RM 20 02/04/06
11 5312 5238 0 OTIS DMY RA 0
10 5797 5722 6 OTIS DMY RA 0
9 5949 5872 11 OTIS DMY RA 0
8 6353 6260 22 OTIS DMY RA 0
7 6501 6397 22 OTIS DMY RA 0
6 6863 6734 21 OTIS DMY RA 0
5 7013 6873 21 OTIS DMY RA 0
4 7425 7261 19 OTIS DMY RA 0
3 7581 7420 17 OTIS DMY RA 0
2 7734 7553 17 OTIS DMY RA 0
1 7887 7703 16 OTIS DMY RA 0
~ ~ 7906' -{5-1/2" OTIS XA SLIDING SLV, ID = 4.562"
' 7973' BOT SBR SEAL ASSY
5-1/2" TBG, 17#, L80, .0232 bpf, ID = 4.892" 7993' 7993' 9 518" x 5-1/2" BOT PKR ID = 4.75"
7993' 5-1/2" X 4-1/2" XO
$054' 4-1/2" OTIS X NIP, ID = 3.813"
TOP OF 7" LNR 8080' $054' 4-1/2" PX PLUG (01/09/08)
$094' 4-1/2" OTIS XN NIP, ID = 3.725"
"
" '
4-1/2
TBG,12.6#, L-80 .0152 bpf, ID = 3.958 8136 8136' 4-1/2" TTL BOT SO SUB
ID = 4.063"
,
" ' 8128' ELMD TT LOGGED 06/29/83
9-5/8
CSG, 47#, L-80, ID = 8.681" $5$5
PERFORATION SUMMARY
REF LOG: DA-BHCA ON 05/21/82
ANGLEATTOPPERF: 15 @ 9156'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-1/8" 4 9090 - 9116 S 04/06/89
3-1/8" 4 9120 - 9123 S 04/06/89
3-318" 4 9123 - 9147 C 04/13/89
2-7/8" 4 9156 - 9166 S 04/06/89
2" 4 9164 - 9174 C 05/24/00
3-3/8" 4 9184 - 9198 C 04/13/89
PBTD 9338'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9405'
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/25/82 ORIGINAL COMPLETION 08/19/06 COM/TLH WA V ER SFTY NOTE DELETED
04/05/03 JDW/KK PERF CORRECTIONS 07/19/07 BSE/PJC PULL PXN @ 8078' (07/09/07)
11/21/05 WTS/PJC XXP PLUG CORRECTION @ 8054' 01/15/08 SEW/SV SET PX PLUG (01/09/08)
01/05/06 EZL/PJC UPDATE WANER SFTY NOTE
01/14/06 KSB/PAG PULLED TTP
07/04/06 GJF/PAG SET PXN PLUG
I MARKER JOINT I
PRUDHOE BAY UNff
WELL: B-18
PERMff No: 1820020
API No: 50-029-20702-00
SEC31, T11N, R14E
BP Exploration (Alaska)
TREE = 6" CM!
WELLHEAD= MCEVOY ~
-
ACTUAT01~= OTIS
' PROPOSED
KB. EL~1/ = 73.75
BF. 6iEV = 45.3'
KOP= 5900' 20' CONDUCTOR 110'
Max Angle = 22@ 6500'
Datum MD= 9032'
' NEW 9-5/8" CSG, 47#, L-80 from TOC to surface
DatumTVD= 8800
SS
GAS LIFT MANDRELS
13-3/8" CSG, 72#, L80, ID = 12.347" 2696'
4-1/2" 12.6#/ft, 13Cr-80, Vam Top @ 8140`
3.5" X NIPPLE
Baker S-3 Chrome PKR @ 8000`
3.5" X NIPPLE
3.5" XN NIPPLE
TOP OF 7" LNR 8080'
9-5/8" CSG, 47#, L-80, ID = 8.681" 8585'
8732' MARKER JOINT
PBTD 9338'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 9405'
PRUDHOE BAY UNfT
WELL: B-18
PERMfT No: 1820020
API No: 50-029-20702-00
SEC 31, T11 N, R14E
BP Exploration (Alaska)
DATE REV BY COMMENTS DATE REV BY COMMENTS
05/25/82 ORIGINAL COMPLETION 08/19/06 COANTLH WAVER SFTY NOTE DELETED
04/05/03 JDW/KK PERF CORRECTIONS 07/19/07 BSE/PJC PULL PXN @ 8078' (07/09107)
11/21/05 WTS/PJC XXP PLUG CORRECTION @ 8054' 01/15/08 SEW/SV SET PX PLUG (01/09/08)
01/05/06 EZUPJC UPDATE WAVER SFTY NOTE
01114/06 KSB/PAG PULLED TTP
07/04/06 GJF/PAG SET PXN PLUG
PERFORATION SUMMARY
REF LOG: DA-BHCA ON 05/21/82
ANGLE AT TOP PERF: 15 @ 9156'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-1/8" 4 9090 - 9116 S 04/06/89
3-1/8" 4 9120 - 9123 S 04/06/89
3-3/8" 4 9123 - 9147 C 04/13/89
2-7/8" 4 9156 - 9166 S 04/06/89
2" 4 9164 - 9174 C 05/24/00
3-3/8" 4 9184 - 9198 C 04/13/89
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 3301
2 5601
3 6962
4 7920
o2iz~/oa
~~~~~~~~~~~ NO. 4599
Alaska Data 8 Consulting Services ~ Company: State of Alaska
2525 Gambell Street, Suite 400 _ ~ ~~i't ~~ i~y'~ ~~~(! Attnk Christine Mahnkenomm
Anchorage, AK 99503-2838 &V' E}
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay,Polaris,Lisburne
Wall .Inh $ Inn r1n .,ti.,., nos., of n..l..- nn
W-216 40016312 OH MWD/LWD EDIT - 2 d- 01/07/08 2 1
LGI-04 11970706 RST ~_p q 12/31!07 1 1
W-45 40016146 OH MWD/LWD EDIT '~-) '~ ( 12!18/07 2 1
15-046 12005202 CH EDIT PDC GR (SCMT) ~- ~ 12/28107 1
C-16B 11209604 MCNL ~~(o-ps' p f C 05/19/06 1 1
B-18 11962779 RST 'd 01/05/08 1 1
~r+v~ r~v,"~v~~~~,.iv a. ,~~.vl_I~ 1 DI JIVI~IIYV MI~V RGI VRIY119V VIYC liVfr CNlirl 1 V.
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1 _ -
900 E. Benson Blvd. ~,
Anchorage, Alaska 99508
Date Delivered: 'i ~~_ ~:~ ~ ~ R j t)"
~~ ~.._..
Alaska Data & Consulting Services
2525 Gambell Street, Suite 4 ~
Anchorage, AK 99503-28 8 ~
ATTN: Beth ~q /
V
Received by:
•
r
"q.. '-U
1. Operations Abandon 0 Repair Well 0
Performed: Alter Casing 0 Pull Tubing 0
Change Approved Program 0 Operat. Shutdown 0
2. Operator BP Exploration (Alaska), Inc.
Name:
ALAS.OIL AND ~:~T¿6~s~~;A~ON COMM.N ngC 0 4 2006
REPORT OF SUNDRY WELL OPERATIONS Aløsktt gill Oil Cons. Commission
o Stimulate 0 Other 0
o WaiverD Time Extension 0
o Re-enter Suspended Well 0
5. Permit to Drill Number:
182-0020
Plug Perforations
Perforate New Pool
Perforate
4. Current Well Class:
Development ¡yo
Stratigraphic
air
3. Address:
Exploratory
Service
6. API Number:
50-029-20702-00-00
P.O. Box 196612
Anchorage, AK 99519-6612
7. KB Elevation (ft):
9. Well Name and Number:
73.8 KB
PBU B-18
ADLO-028310
11. Present Well Condition Summary:
10. Field/Pool(s):
PRUDHOE BAY Field/ PRUDHOE OIL Pool
8. Property Designation:
Total Depth
measured
true vertical
9410
9239
feet
feet
Plugs (measured) None
Junk (measured) fill @ 9278' MD
Effective Depth measured 9278 feet
true vertical 9111 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" Insulated 29' - 139' 29' - 139'
Surface 2666' 13-3/8" 72# L-80 30' - 2696' 30' - 2695' 5380 2670
Intermediate 8556' 9-5/8" 47# L-80 31' - 8585' 31' - 8445' 6870 4760
Liner 1325' 7" 26# L-80 8080' - 9405' 7962' - 9234' 7240 5410
Perforation depth:
Measured depth: 9090' - 9198'
True Vertical depth: 8930' - 9034'
-
-
-
-
Packers and SSSV (type and measured depth)
5-1/2" 17#
4-1/2" 12.6#
9-5/8"X5-1/2" BOT PKR
o
o
o
L-80
L-80
Surface - 7993'
7993' - 8136'
7993'
o
o
o
Tubing: (size, grade, and measured depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
, . ~~~1'~\\'
."{i~.. .. !àìÞ-l~~C.·'"
~"'\o;:I(I-'); \':
, ..
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
Oil-Bbl
644
Shut in
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casing Pressure
6525 1083 0
o 0 0
15. Well Class after proposed work:
Exploratory Development P
16. Well Status after proposed work:
Oil I~ Gas WAG
Tubing pressure
1179
o
13.
Service
x
Contact Gary Preble
WINJ
WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title Data Engineer
Signature
Phone 564-4944
Date 11/30/2006
,; "-" ._-~"
Submit Original Only
ORIGINAl
.
.
B-18
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
*** WELL S/I ON ARRIVAL *** (surface csg repair)
RIG UP UNIT
*** CONTINUE TO 11/23//06 ***
11/23/2006 *** CONTINUE FROM 11/22/06 *** (surface csg. repair)
PULL PXN PLUG FROM 8078'SLM (SET 07/04/06).
SET PX PLUG BODY / WITH 4 EA. 3/16 EO. PORTS @ 8042' SLM. RAN
CHECK SET/SHEARED.
SET PRONG @ 8036' SLM (1.80 BODY, 1.75, FN, 96" OAL. TESTED PLUG TO
3000 PSI W/LRS.
DRAW TBG DOWN TO 300 PSI PRIOR TO DEPARTURE.
***LEFT WELL S/I*** PAD OP NOTIFIED.
11/23/2006 T/I/O= 20/20/20. Temp.= SI. No AL. TBG & IA FL. (S/L). TBG FL @ 300'. (7
bbls). IA FL @ 310'. (14 bbls).
FLUIDS PUMPED
BBLS I
16 DIESEL
16 TOTAL
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 19 March 1996
RE: Transmittal of Data
ECC ~: 1317.03
Sent by: HAND CARRY
Data: LDWG
Dear Sir/Madam,
Reference:
BP
B-18
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: i
LDWG TAPE+LIS
Run ~ i
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
to (907) 563-7803
Received by: Date:
RECEIVED
Alaska Oil & Gas Cons. Gommissk)n
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 12 March 1996
RE:
Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
1 CN FINAL BL+RF
1 PFC/PERF FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
Run # 1
Run $ 1
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
1317.03
1531.03
5748.03
5942.03
6431.04
6619.00
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Received by:
FAX to (907) 563-7803
Date: ~aska
Please sign and return t~
Petrotechnical Data Oente~
BP Exploration (Alaska) Tho
900 East Benson Boulevard
Anchorage, Alaska 99508
Received
-- ALASKA OiL & ~a~ ~vm~.u~¥ATIO.l COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 4 August 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
7F-71 .-12 (43-31-1-14)
1 PLS STATIC FINAL BL
1 PLS STATIC RF SEPIA
~' 2, - o % s-18
i PLS STATIC FINAL BL
i PLS STATIC RF SEPIA
7-~" '~ 2 M-32 (41-01-11-12)
i PLS STATIC FINAL BL
1 PLS STATIC RF SEPIA
'tV ' 73 .-25 (33-7-11-13)
1 PL/STATIC FINAL BL
1 Pi/STATIC RF SEPIA
I PLS STATIC FINAL BL
i PLS STATIC RF SEPIA
~ d>-- 3 g'' B-04 (23-29-11-14)
i PLS STATIC FINAL BL
i PiS STATIC RF SEPIA
f ~-rPV w-31 (31-17-11-12)
1 PLS STATIC FINAL BL
i PLS STATIC RF SEPIA
ECC No.
Run # 1 5791.03
Run # 1
Run # 1 1317.02
Run # 1
Run # 1 5790.01
Run # 1
Run # 1 6238.02
Run # 1
Run # 1 4146.02
Run # 1
Run # 1 5807.01
Run # I
Run # 1 5659.02
Run # 1
Please sign and return to: Atlas Wireline Services
.. 5600 B Street
Suite 201
. Anchorage, AK 99518
~ ./~odney;. Paul,on .
Received b~--~~//z/ ~/ b~te:
RECEIVED
AU(; 08 1994
Alaska Oi~ ~ ~-_.s Ce,-.s. C~r~'imJa~lo~
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 2 August 1994
RE: ~\ Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL ~ ~ t% ~ # DESCRIPTION
Please sign and return to: Atlas Wir~line S~rvices
5600 B Street
Suite 201
ECC No.
Run # 1 1423.06
Run # 1 5806.02
Run # 1 5922.02
Run # 1 1317.01
Run # 1 6245.00
An
At
Received
~or~ge, AK 99518
~°~~Paul s°nDat~:
Please sign and return to:
Petrotechnical Data Center
BP Exploration (Alaska) Ino
900 East Benson Boulevard
Anchorage, Alaska 99908
P~eeived by
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 2 August 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
ECC No.
.07 - Run
~E-08 (22-32-12-14) Run # 1
~ J~-lS" Run ~ 1
Please sign and return to: Atlas Wireline Services ~0~
5600 B Street %~
Suite 201 ~C~ 0~
Anchorage, AK 99518 '~8 ~/~
F3ne
1 CN/GR LDWG TAPE+LIST
1 CN/GR LDWG TAPE+LIST
1 CN/GR LDWG TAPE+LIST
1 CN/GR LDWG TAPE+LIST
1 DIFL LDWG TAPE+LISTR
1423.06
5806.02
5922.02
1317.01
6245.00
Please sign and return to:
Petrotechnical Data Center
BP Exploration (Alaska) Ine
900 East Benson Boulevard
Anchorage, Alaska 99~08
Received b~'
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 20 July 1994
RE:, Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
$Z-05 s-19
-02- s-18
5~--- [\7-- B-23
B-22 (32-32-11-14)
B-15 (21-13-11-14)
DESCRIPTION
~f~N/GR FINAL BL
CN~GR FINAL RF S~PIA
,~-r~'CCL PATCHST FINL. BL
CCL PATCHST RF SEPIA
ECC No.
Run # 1 5806.02
Run # 1
Run # 1 ~317.01
Run # 1
Run # 1 5808.03
Run # 1
Run # I 1423.06
Run # 1
Run # 1 5798.09
Run # 1
Received by:
Please sign and return to: Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Please sign and return to:
Petrotechnical Data Center
BP Exploration (Alaska) Inc
900 East Benson Boulevard
Anchorage, Alaska 99508
Received by
Date:
Date
STATE OF ALASKA COMMI( 'N
~ ,CA OIL AND GAS CONSERVATION 0 R i G I 'I~A L
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:' Operation shutdown ,
Pull tubing
Stimulate X Plugging
Alter casing Repair well
2. Name of Operator
BP Exploration (Alaska)/nc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development .Z._
Exploratory
Stratigraphm
Service
4. Location of well at surface
344' SNL, 1892' WEL, SEC. 31, T11N, R14E, UPM
At top of productive interval
403' NSL, 1589' WEL, SEC. 30, T11N, R14E, UPM
At effective depth
470'NSL, 1461' WEL, SEC. 30, T11N, R14E, UPM
At total depth
485' NSL, 1431' WEL, SEC. 30, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
9410feet
true vertical BKB 9239feet
Effective depth: measured 9278feet
true vertical BKB 911~feet
Casing Length Size
Structural --
Conductor 110 20 x 30
Surface 2667 13 3/8
Intermediate 8556 9 5/8
Production --
Liner 1325 7
Perforation depth: measured 9123'-9147', 9184'-9198'
Plugs (measured)
Junk (measured)
Cemented
8 c.y.
3720 c.f.
1285 c.f.
390 c.f.
Perforate
Other .....
6. Datum elevation (DF or KB)
KBE= 73.75 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
B-18 (34-30-11-14) PBU
9. Permit number/approval number
82-2/
10. APl number
50- 029-207o2
11. Field/Pool
Prudhoe 0il Pool
fill at 9278' MD BKB (04/89)
Measured de~h True vertical de~h
BKB
139 139
2696 2696
8585 8445
8080-9405 7962-9234
Sqzd: 9090~9116~ 9120~9123~ 9156~9166'
true vertical subsea
8888'-8960' (two intervals)
Tubing (size, grade, and measured depth) 5 1/2 L-80 to 7993' with 4 1/2" tailpipe to 8136'
Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 7993~ 5 1/2" SSSV at 2020'
13. Stimulation or cement squeeze summary 11~/91 HCL ACID Treatment
Intervals treated (measured) 9184'- 9198'
189 BBL Production Water
Treatment description including volumes used and final pressure 47BBL MEOH
28 BBL 15% HCL
SEP - 8 1992
· ~,,,~ ~uJl & (~as Cons. C0mmiss
14.
Prior to well operation
Subsequent to operation
Re0resentative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
990 5309 13 0
1410 5054 34 0
Tubing Pressure
2o59
1905
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil ..X ~.. Gas Suspended
Service
17. I hereby ce,rtify that the foregoipg is true. a, nd correct to the best of my knowledge.
Signed _ ./-~ ,d../~ Title Senior TechnicalAssistant I
Form 10-404'Rev 06/15/88 /
Date
SUBMIT I1~" DfJ PLI~.,ATE
BP EXPLORATION
BP Exc c'at~on (Alasxal Inc
900 F. as' Benson Bou~evarcl
PO Box ~96612
~c~c-~:e Alaska 995"9-6612
(907) 56;-5111
DATE: 10/30/91
T~ 82965
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907), 564-4004.
~-~ ~ 10/11/91 ~1
] -18 -- iO/i ./9:L
~.~? S-05~ 09/29/91 ~1
, A-01 ~' 09/20/91
10900.00-11039.00 HLS 5 "
8950.00- 9231.00 HLS 2 "
9400.00- 9660.00 HLS 2 "
9124.00- 9535.00 HLS 5 "
9979.00-10221.00 HLS 5 "
8686.00- 9024.00 HLS
CL
P ROD-F
PROD-F
STATIC
STATIC
ROTASCAN
2 "
ROTASCAN
5
5
~-0~ ~ T~CER CHEC~
5
A-01 ~ T~CER CHECK
%'A-01~-/' 09/20/91
" A-0' '- 10/05/91
8700.00- 9025.00 HLS
8700.00- 9013.00 HLS
09/'20/91' ~i 'F'U',' 8600J00 9500;00
09/20/91 ~1 8700.00- 9010.00 HLS
09/20/91 $1 8600.00- 9040,.00 HLS
Information Control
;Tel! Records
Adrian J. Martin
BP EXPLORATION
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 02/08/90
Transmittal: 80896
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINkL LOGS
Enclosed is your copy of the material listed below. If
questions, please contact BP Well Records at (907) 564-4445.
you have any
B-18 LEAK DET. 01/26/90 #1 400-9200 Camco
Y-17 GAS LIFT 01/26/90 #1 Surface-10472 Camco
Y-18 INJ 01/24/90 #1 10890-11285 Camco
2"/5"
2"/5"
5"
Distribution:
kRCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
ARCHIVES------
BP E~PLORATION
BP Ex01oratlon (Alaska) Inc.
900 East 8enson 8oulevarcl
PO Box 196612
Anct~orage. Alaska 99519-6612
(907) 561-5111
To: Distribution
Date: 01/29/90
Transmittal: 80826
From: Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material
questions, please contact BP Well Records
listed below. If
at (907) 564-4445.
,~
you have any
B-04 PROD-F 01/12/90
B-18 PROD-F 01/15/90
C-24 PROD-F 01/13/90
G-Il PROD-F 01/14/90
Z-01 PROD-F 01/15/90
Z-10 PROD-F 01/13/90
#1 10350-10650
#1 8950-9230
#1 10150-10450
#1 11200-11550
#1 10450-10720
13450-13890
Camco 5"
Camco
Camco 5"
Camco
Camco 5"
Camco 5"
Distribution:
ARCO
CHEVRON
E~XON
GEOSCIE~CES
MOBIL
PHILLIPS
ARCHIVES
,.
R£¢EIVEO
lC~
JAN ~ 1 .~90
Alas~,'a. 0il ~ S~s Cons,, comm~
Anchorage
BP EXPLORATION
IGINAL
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
August 14, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well B-18 (34-03-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of performing a cement squeeze and reperforation
of the well.
Yours very truly,
J A Bragg ~U
~roduction Engineering
JAM:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
REPORT OF SUNDRY WELL OPERATIONS
Stimulate ~ Plugging
Alter casing ....... Repair well
5. Type of Well:
Development X
Exploratory .
Stral~graphic
Service
9410feet Plugs (measured)
9239feet
9278feet Junk (measured)
9111 feet
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
344' SNL, 1892' WEL, SEC. 31, T11N, R14E, UPM
At top of productive interval
403' NSL, 1589' WEL, SEC. 30, T11N, R14E, UPM
At effective depth
470'NSL, 1461' WEL, SEC. 30, T11N, R14E, UPM
At total depth
485' NSL, 1431' WEL, SEC. 30, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Effective depth: measured
true vertical BKB
Size Cemented
20x30 8 c.y.
13 3/8 3720 c.f.
9 5/8 1285 c.f.
7 390 c.f.
Casing Length
Structural --
Conductor 110
Surface 2667
Intermediate 8556
Production --
Liner 1325
Perforation depth: measured
9123'-9147', 9184'-9198'
true vertical subsea
8888'8960' (two intervals)
Perforate
Other X
6. Datum elevation (DF or KB)
KBE ~ 73. 75 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
B-18 (34-30-11-14) PBU
9. Permit number/approva'l'number
82-2 / 9-151
10. APl number
5O- O29-207O2
11. Field/Pool
Prudhoe Oil Pool
fill at 9278' MD BKB (04/89)
Measured depth True vertical depth
BKB
139 139
2696 2696
8585 8445
8080-9405 7962-9234
Sqzd:9090~9116~ 9120~9123~ 9156~9166'
Tubing (size, grade, and measured depth) 5 1/2 L-80 to 7993' with 4 1/2" tailpipe to 8136'
Packers and SSSV (type and measured depth) 9 5/8" BOT packer at 7993';5 1/2" SSSV at 2020'
13. Stimulation or cement squeeze summary see attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Reoresentative Daily Averaae Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Prior to well operation 1190 11349 0 0
Subsequent to operation
6850 3822 220 0
15. Attachments ~ 16. Status of well classification as:
Copies of Logs and Surveys run ........
I
Daily Report of Well Operations X Oil X Gas Suspended.
Service
Tubing Pressure
2419
272
17' I her~j:~l~/-'~- ~ that the f°~g~'~g is true and c°rrect t° the best of mY kn°wledge'
Form
( (
WELL B.18 ¢34-30-11.14~ PBU
CTU CEMENT SOUEEZE OPERATIONS
A coiled tubing cement squeeze of existing perforations was performed as follows:
3/21/89
4/6/89
4/9/89
4/13/89
Performed perforation mud acid wash with ballsealers; flowed well.
Rigged up coiled tubing unit and pressure tested to 4000 psi. Cement squeezed
all perforations.
Performed inflow test; squeeze good.
Rigged up Halliburton and perforated the following intervals using 3 3/8"
carrier guns at 4 spf:
Reperf 9123' - 9147' MD BKB
Add perf 9184' - 9198' MD BKB
Returned well to production and tested.
jam
8/4/89
BP EXPLORATION
BP Exploration (Alaska) Inc.
gOO East Benson Boulevard
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL' '
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
ARCHIVES
Date: 06-21-89
'T%: 80131
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
B-18 CCL/PERF 04-13-89 #1 8030-9234 HLS 5"
D-08 CCL/PERF 04-27-89 #1 9900-10466 HLS 5"
F-03 CCL/PERF 04-20-89 #1 9500-11100 HLS 5"
H-23 CCL/PERF 04-11-89 #1 9700-9950 HLS 5"
N-4A CCL/PERF 04-10-89 #1 9830-10419 HLS 5"
R-18 CCL 06-17-89 #1 9000-9968 Atlas 5"
Y-10 CCL 06-15-89 #1 9382-9797 Atlas 5"
Received:
Date:
RC V
Alaska 0il & (~as Cons. Co 'ss'on
Anchorage
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
BP EXPLORATION
February 21, 1989
BP Exploration (Alaska) Inc
900 East Benson Boulevard
PO Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well B-18 (34-30-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perform a cement squeeze and reperforation of the
well.
Yours very truly,
Manager Production Engineering
JAB:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
Anchoraeje
1. Type of Request:
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
Operation Shutdown ,, Re-enter suspended well ~
Plugging ~ Time extension Stimulate
Pull tubing ~ Variance ,. Perforate Other X ~
5. Type of Well: 6. Datum elevatiocr'(bF" or KB)
KBE= 73.75 AMSL feet
Abandon Suspend
Alter caslng ~ Repair well~
Change approved program ~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
344' SNL, 1892' WEL, SEC. 31, T11N, R14E, UPM
At top of productive interval
403' NSL, 1589' WEL, SEC. 30, T11N, R14E, UPM
At effective depth
477' NSL, 1447' WEL, SEC. 30, T11N, R14E, UPM
At total depth
485'NSL, 1431' WEL, SEC. 30, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
true vertical BKB
Development X
Exploratory ~
Stral~graph~c
Service
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
B-18 (34-30-11-14) PBU
9. Permit number
82-2
10. APl number
50- 029-20702
11. Field/Pool
Prudhoe Oil Pool
9410 feet Plugs (measured)
9239 feet
Effective depth: measured 9338 feet Junk (measured)
true vertical BKB 9169 feet
Casing Length Size Cemented
Structural --
Conductor 110 20 x 30 8 c.y.
Surface 2667 13 3/8 3720 c.f.
Intermediate 8556 9 5/8 1285 c.f.
Production --
Liner 1325 7 390 c.f.
Perforation depth: measured 9090'-9116', 9120'-9147', 9156'-9166'
Measured depth
139
2696
8585
8080-9405
True vertical depth
BKB
139
2696
8445
7962-9234
true vertical subsea
8856'-8929' (three intervals)
Tubing (size, grade, and measured depth) 5 1/2 L-80 to 7993' with 4 1/2" tailpipe to 8136'
Packers and SSSV (type and measured depth) 9 5/8" BO Tpacker at 7993~ 5 1/2" SSS Vat 2020'
13. Attachments Description summary of proposal X
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Detailed operations program
Suspended~
BOP sketch X
15. Status of well classification as:
Date ,~ ' [~(~'~' [
lapprOvalNO' ~-/"',.~'"'-//
14. Estimated date for commencing operation J
February 1989
16. If proposal was verbally approved Oil X Gas ~
Name of approver Date approved Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SJ~ned ~/,,~Y[~ ~x~. ~~ Title Mana~Ter Production Engineering7
n/'/d~ons al °tif ~/~ FOR COMMISSION USE ONLY
Co of approv : N y Commission so representative may witness
Plug integrity__ BOP Test __ Location clearance __
Mechanical Integrity Test__ Subsequent form required 10- ~/~'~
ORIGINAL SIGNED BY
LONNIE C. SMITH
Commissioner
r~,pproved Copy
Date ~=,e
SUBMIT IN ~RIPLICATE
( (
WELL B-18 (34-30-11-14~ PBU
CTU CEMENT SOUEEZE PROPOSAL
A coiled tubing cement squeeze of existing perforations is proposed as follows'
1. Perform pre-workover surveillance.
2. Rig up CTU and support equipment and pressure test BOP's to 4000 psi.
3. Perform perforation mud acid wash; flow well.
4. Cleanout wellborc to PBTD or to top of solid fill.
5. Fluid pack wellbore with produced water.
6. Pump cement and squeeze existing perforations.
7. Reverse out cement after squeeze is obtained. WOC for 24 hours, then test
squeeze. If squeeze fails, immediately resqueeze and WOC.
8. If squeeze is successful, perforate the following intervals:
Rcpcrf 9123' - 9147' MD BKB
Add pcrf 9184' - 9198' MD BKB
The intervals 9090' - 9116' and 9120'- 9123' will be left squeezed. All depths
are referenced to BHCS 5/21/82.
9. Return well to production and test.
jam
' ~,nchorage
(
Coiled Tubing Blow-Out-Preventers
/,~ Coiled Tubing
INDEXED
DALLAS
ARCO
CHEVRON
E~XON
TEXACO Date: 04/27/88
TO: MOBIL TI: 78759
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
AL AS~\ PRODUC
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material ts being submitted herewith. Please acknowledge recelpt by
$1gnlng a copy of this letter and returning It to this office:
~A-16
· ~ A-23
B-12
~G-2
~ H-23
R-9
'~ R-20
Injection Profile 04/15/88 #1 9400-9850 Camco 5"
" " 04/13/88 #1 10550-10850 Camco 5"
Production Profile 04/10-11/88 #1 11200-11600 Camco 5"
GR/CCL 04/15/88 #1 8650-9025 Sch 5"
Spinner 07/18/83 #1 9090-9147 Camco 5"
GR 04/13/88 #1 9600-10228 Camco 5"
CBT 04/21/88 #1 8995-10156 Sch 5"
Spinner/Temp/Tracer 04/17/88 #1 9400-9900 Sch 5"
Production Log 04/18/88 #1 9000-9500 Sch 5"
Injection Profile 04/15/88 #1 11200-11850 Camco 5"
Standard Alaska
Produchon Company ~ I
900 Eos! Benson Boulevo~k
P O Box 196612
Ancho~oge Alosko 99519 6612
1907) .%64 51 I I
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 1i/18/86
TO: MOBIL T~: 77525
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
STANDARD
AL ASKA PRODUCT ION
REFERENCE:
SA]PC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
B~18 Perf. Record 07/04/86 #1 8650-9250 $ch 5"
B-20 Perf. IRecord 07/05/86 #1 9530-9854 Sch 5"
G-30 CET 08/06/86 ~Jl 8762-9766 Sch 5"
G-30 CBT 08/06/86 ~/1 8672-9743 Sch 5"
G-32 CBT 08/27/86 t/1 8350-9550 Sch 5"
J-1 Tubing Cutter Record 08/23/86 ~/1 8600-9100 Sch 5"
J-19 GCT 07/12/86 #1 SURF-1390 Sch 5"
J-19 GCT 07/12/86 ~J2 SUR~'-i 772 Sch 5"
M-2 Perf. Record 07/01/86 f/l 10000-10334 Sch 5"
M-2 Spinner Profile 07/09/86 #1 9695-10300 Sch 5"
M-21 Perf. Record 07/04/86 #1 8370-9250 Sch 5"
R-18 Perf. Record 07/06/86 #1 8990-10067 Sch 5"
R-23 Perf. Record 07/03/86 f/1 11240-12174 Sch 5"
S-19 GCT 07/21/86 I/1 SURF-1498 Sch 5"
S-19 CBT 08/13/86 #1 9100-10110 Sch 5"
S-20 CBT 08/30/86 ~/I 8710-9774 Sch 5"
Y-24 GCT 07/15/86 ~/1 SURF-13450 Sch 5"
Y-24 CBT _ ~ 07/15/86 fJl 12600-13488 Sch 5"
~la~kaOii & Gas I . '~sion ~
Anchorage
Received
Dote
A un,I OI the o.g,nol .5toncJz~,d 0,1 Co,npony
l~o,,,,cJed ,n Cle~,.Iond Oh,o .. Itl/()
Victoria Aldridge
INFORMATION CONTROL
Well Records LR2-1
Standard Alaska
Productmn Company (
900 East Benson Boulevak
P O Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
STANDARD
ALASKA PRODUCTION
July 10, 1986
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Well B-18 (34-30-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations,
for the above-named well. This contains our subsequent report of
perforating the well.
PFB:JAM~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
B-18 Well File
Yours very truly,
P. F. Barth, Supervisor
Reservoir/Production
Surveillance Unit I
JUL ~. z~
kl~ska Oil & Gas Cons. Goings,lam
Anchorage
A un,t of the or,g~nal Standard Od Company
Founded ,n Cleveland Oh,o, ,n 1870
REPORT OF SUNDRY WELL OPERATIONS
I Operations performed Operation shutdown [] Stimulate [] Plugging ~ Perforate ~ Pull tubing ~
AIterCas~ng ~ Other ~
2 Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3 Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, UPM
At top of productwe ~nterval
403' NSL, 1589' WEL, Sec. 30, TllN, R14E, UPM
At effective depth
477' NSL, 1447' WEL, Sec. 30, TllN, R14E, UPM
At total depth
485' NSL, 1431' WEL, Sec. 30, TllN, R14E, UPM
5 Datum elevation (DF or KB)
KBE = 73.75
6 Unit or Property name
Prudhoe Bay Unit
7. Well number
B-18 (34-30-11-14) PBU
8 Approval number
195
9 APInumber
50-- 029-20702
10 Pool
Prudhoe Oil Pool
Feet
11 Present well condition summary
Total depth measured
true verhoal
9410 feet
9239 feet BKB
Plugs (measured)
Effective depth' measured
true vertical
9338
9169
feet Junk (measured)
feet BKB
Casing Length
Structural --
Conductor 65 '
Surface 2651 '
Intermediate 8540 '
Production __
Liner 1325 '
Perforahon depth, measured
9090' -
9166'
Size
Cemented
8 cu.yds.
3720 c.f.
1285 c.f.
20"x30"
13 3/8"
9 5/8"
1!
390 c.f.
(three intervals)
true vert,cal (subsea)
8856' - 8929'
Tubing (s~ze, grade and measured depth)
5 1/2" L-80 to 7993' with 4 1/2" tailpipe to 8136'
Packers and SSSV (type and measured depth)
9 5/8" BOT packer at 7993': 5 1/2" Otis SSSV at 2020'
12 Shmulahon or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Measured depth
110'
2696'
8585'
8080'-9405'
True Verhcal depth
BKB
110'
2696'
8445 '
7962'-9234'
, ,~r~a ~'
Alaska Oit & Gas Cons. Comm'~ssiot~
AnCh0rag0
13
Prior to well operation
Subsequent to operation
Representative Daily Average Pr)duchon or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl
3350 2050 0
Casing Pressure
0
0
8070 10895 0
~bing Pressure
849
1079
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Title Supvr. Res./Prod. Surveillance I
Form 10-404 Rev 12-1-85 Submit ~n Duplicate
(
Well B-18 (34-30-11-14) PBU
ADDITIONAL PERFORATING OPERATIONS
7/4/86:
Installed and tested lubricator to 3500 psi. Rigged
up Schlumberger and perforated the following additional
interval using 2 7/8" Hyperdome guns at 4 spf:
9156' - 9166' MD (8919' - 8929' TVDss)
Above depths are referenced to BHCS/GR, 5/22/82.
Put well back on production and tested.
jm
7/9/86
Standard Alaska
Productmn Company
900 East Benson Bouleva~.
P O Box 196612
Anchorage, Alaska 99519-6612
(907) 564 5111
June 17, 1986
STANDARD
ALASKA PRODUCTION
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Well B-18 (34-30-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal to
perforate the well.
·
PFB: JAM ~
Enclosures (9)
cc: J. L. Haas (MB12-1)
B-18 Well File
Yours very truly,
P. F. Barth, Supervisor
Reservoir/Production
Surveillance Unit I
A un,t of the or,g,nal Standard O,I Company
Founded ,n Cleveland Oh,o ,n 1870
RECEIVED
JUN 2 o
Ala:ka Oil & (~s Cons.
STATE OF ALASKA
ALASK/~' L AND GAS CONSERVATION COMMI~r 9N
APPLICATION FOR SUNDRY APP IOVALS
I Type of Request Abandon ~ Suspend ~ Operahon Shutdown F' Re-enter suspended well ~ Alter casing Z
T~me extension ~ Change approved program- Plugging ~ Shmulate ~_ Pull tuWng ~" Amend order-_ Perforate ~ Other
2 Name of Operator 5 Datum elevation (DF or KB)
STANDARD ALASKA PRODUCTTON COMPANY KB:E = 73.75 feet
3 Address 6 Und or Property name
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit
4
Location of well at surface
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, UPM
At top of produchve ~nterval (top Ivishak/Sadlerochit)
403' NSL, 1589' WEL, Sec. 30, TllN, R14E, UPM
At effechve depth
477' NSL, 1447' WEL, Sec. 30, TllN, R14E, UPM
At total depth
485' NSL, 1431' WEL, Sec. 30, TllN., R14E¢ UPM
11 Present well condition summary
Total depth measured
true vertical
7 Well number
B-18 (34-30-11-14) PBU
8 Permit number
82 -2
9 APl number
50--029-20702
10. Pool
Prudhoe Oil Pool
9410 feet Plugs (measured)
9239 feetBK. B
Effective depth measured 9338 feet Junk (measured)
true vertical 9169 feetBKB
Casing Length S~ze Cemented
Structural --
Conductor 65' 20"x30" 8 cu.yds.
Surface 2651' 13 3/8" 3720 c.fo
Intermediate 8540' 9 5/8" 1285 c.fo
Production __
Measured depth
110'
2696'
8585'
True Verhcal depth
BKB
110'
2696'
8445'
L~ner 1325' 7" 390 c.f.
Perforation depth measured
9090' - 9147' (two intervals)
true vertical (subsea)
8856' - 8911'
~b~ng(s~ze, grade and measured depth)
5 1/2" L-80 to 7993' with. 4 1/2" tailpipe to 8136'
Packers and SSSV(type and measured depth)
9 5/8" BOT packer at 7993'
8080'-9405'
; 5 1/2" Otis "RQY" SSSV at 2020'
7962 '-9234'
[C/IV D
JUN 2 0
'Alaska 0il & Gas C0~]s.
12 Attachments
Description summary of proposal :~ Detailed operahons program ~ BOP sketch
13 Estimated date for commencing operation
June/July 1986
14. If proposal was verbally approved
Name of approver Date approved
15..I hereby ce. rhfy that the f~ego~ng is true and correct to the best of my knowledge
Sign'~ed /~ f. ~~ Titlesu~vr. Res./Prod. Surveillance i Date
P. F. Barth Commission Use Only
Conditions of approval
Notify commission so representative may witness
[] Plug ~ntegnty [] BOP Test []
P,~.turned
_
,,,,
Commissioner
Approval No
Approved by
by order of
the commission Date ~'~ ~-- ~'
Form 10-403 Rev 12-1-85 Submit ~n triplicate
Well B-18 (34-30-11-14) PBU
ADDITIONAL PERFORATING PROPOSAL
We propose to perforate the following additional interval in Well B-18
during June/July 1986 at 4 spf:
9156' - 9166' MD (8919' - 8929' TVDss) Ref. BHCS/GR, 5/22/82
A lubricator will be installed and tested to 3500 psi for all well work.
The SSSV will be pulled prior to perforating and reset after the job at
2020'.
jm JUN 2 o
6/17/86 ~'~'~,~ Oii& Gas Cons. Co,~ ........ ~
BASIC SYSTEM MAKEUP
BOWEN PACKOFF
HAND PUMP
GREASE SEAL
FLOWTUBE
~LOWLINE
GREASE LINE
FLOWLINE
VALVE
GREASE
, )~/~ MANIFOLD
RISER
GREASE
RESERVO{R
BOP
CEIV -D
(
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO SFO/UNIT/STATE: GETTY
(-Marathon) MOBIL
PHILLIPS
BPAE (Transmittal Only)
CENTRAL FILES(CC#'s-Transmittal Only)
REFERENCE
31 1 1 "C" STREET
ANCItOFiAG[ ALASKA
'[FL[I'HONE 1907l 265 0000
MAIL PQUCH 6-612
ANCHORAGE, ALASKA 99502
Date: 2-15-84
CC#: 75040
2~HIO CASED HOLE FINAL LOGS
5/T~ ~ol'ow,nc3 mater,al :s be,nc3 subm,tted herew,th Please acknowledc3e recefpt by s,c3n,ncj a
copy of th~s letter and return,ncj it to th~s off~ce --
SPO/UNIT/STATE:
D.S. A-11''/
TDT-M 10-19-83 - #2 9650-10639 Sch 5"
D.S. B-18~ TDT-M 10-10-83 #1 8550-9319 Sch 5"
D.S. B-22 ~ TD]7-M 10-12-83 #1 10200-11200 Sch 5"
D.S. B-23~ TDT-M 10-08-83 #I 9150-10010 Sd~ 5"
D.S. E-!3'-- TDT-M 10-07-83 #1 10300-11310 Sd~ 5"
D.S. N-9/ TDT-M 10-11-83 #1 8800-9712 Sch 5"
D.S. x-16'~ TDT-M 10-13-83 #1 10100-10878 Sd~ 5"
D.S. X-17~ TDT-M 10-15-83 #1 9300-10352 Sch 5"
D.S. A-11 ~ EPL 10-19-83 #- 9800-10640 Sch 5"
(4/82)
RECEIVED
DATt'
19
Development Geology
Well Records
SOHIO
ALASKA
PETROLEUM
COMPANY
3111 '°C'° STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
TO State of Alaska
11-17-83
CC#: 074826
REFERENCE:
SOHIO MAGNETIC LIS TAPES AND LISTINGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
~,,
ACC # .
.... / A-29 , ~ 68633~ -~- -10-4-83 ~ ~'m 1"~¢ /
~'/~/- ~~~. ~ ,, 68667~/ z0-?-83 ~ ~ - ,p ,...
' ~" / N-B ~ 68671~ 10-11-83 ~ ~ -- ----
/~17f'fl~~ _~ . .... /_.. ~/~3~-0~~~~/~17 7~'
~ ~-1~ O.~ '~68536~/. 9-2-83 ~ ~ 2
A-~ O.~ 68623 ~/ 9-27-83 ~ ~2 ~ ~ 3
RECEIVED
DATE
Devel~t Geology
~ ~ml~-~-"~eli Records
Anchorag9 k~t
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
November 17, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
We1~'I$~34-30-11-14) PBU and B-20 (14-29-11-14)PB~
Enclosed, in duplicate, are Forms 10-403, Sundry Notices and Reports
on Wells, for the above-named wells. These contain our subsequents
to performing scale inhibitor squeeze treatments on these wells.
GJP/J~H~/pj w
Enclosures
cc: J. D. Hartz
Geology
Well File #17
Yo v u y,
D±str±¢t ?etroleum Eng±neer
(~ STATE OF ALASKA C~
ALASKA OIL AND GAS CONSERVATION MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
2 Name of Operator
Sohio Alaska Petroleum Company
3 Address
Pouch 6-612, Anchorage, Alaska 99502
COMPLETED WELL
OTHER []
7 Permit No
82-2
8 APl Number
50- 029-20702
4 Location of Well
At Surface:
344' SNL, 1892' WEL, Sec.
31, TllN, R14E, UPM
5 Elevation m feet (indicate KB, DF, etc )
KBE = 73.75' AMSL
Lease Designation and Serial No
ADL 28310
9 Unit or Lease Name
Prudhoe Bay Unit
10 Well Number
B-18 (34-30-11-14) PBU
11 F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
12
Check Appropmate Box To Indicate Nature of Not~ce, Report, or )ther Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF'
(Submit m Tmphcate) (Submit m Duplmate)
Perforate [] Alter Casing [] Perforations [] Altering Camng []
Stem ulate [] Abandon [] St ~m ulat~on J~ Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
[] Other [] Pulhng Tubing []
Pull Tubing
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Descmbe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, ~ncludmg estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
A 45 barrel scale inhibitor treatment was performed over the following intervals
in early November, 1983. The well was shut-in for 24 hours after the treatment.
The SSSV was removed prior to stimulation and reset after the job at 2020~.
9090'-9116' BKB (Ref. BHCA/GR, 5/22/82)
9120'-9147' BKB ( " )
~i4 I hereby~c/e~t,f~[ that the~_ego,ng ,s true and correct to the best of my knowledge
S~gned T~tle District Petroleum Engineer
J The sp~a~,~3elow fe~.l~ommms~on use
Conditions of Approval, ~f any
Approved by
By Order of
COMMISSIONER the Commms~on
Date
Form 10-403
Rev 7-1-80
SubmIt "Intentions" ~n Tr~pl,cate
and "Subsequent Reports" ~n Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
November 4, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gentlemen:
Mr. C. V. Chatterton
Wells ~-18~and B-20 PBU
Enclosed, in triplicate~ are Forms 10-403, Sundry Notices and Reports
on Wells, for the above-named wells. These contain our proposals to
perform scale inhibitor squeeze treatments on these wells.
G~~. J.~~sga ~
District Petroleum Engineer
GJP:J~.'pjw
Enclosures
CC:
J.D. Hartz
Geology
Well File #17
(' STATE OF ALASKA ~
ALASKA OIL AND GAS CONSERVATION C MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL
OTHER []
2 Name of Operator 7 P~rc,t2No
Sohio Alaska Petroleum Company ~
3 A.¢dress_ 8 APl. Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20702
4 Location of Well
At Surface:
344' SRL, 1892' WEL, Sec. 31, TllN, R14E, U!rM
5 Elevation m feet (m(J~cate KB DF, etc )
KBE = 73.75' AMSL'
12
6 zayre D~.~n and Serial No
9. Unit or Lease Name
Prudhoe Bay Unit
10 Well Number
B-18 (34-30-11-14) PBU
11 F~eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF
(Submit m Tmpl~cate) (Submit m Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate ~] Abandon [] Stimulation [] Abandonment []
Repmr Well [] Change Plans [] Repmrs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note Reportmult~plecomplet~onson Form 10-407w~thasubm~tted Form 10-407 for eachcomplet~on)
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
A 45 barrel scale inhibitor squeeze treatment will be performed over the following
intervals during November/December, 19_83, The well will be shut-in for 24 hours
after the treatment. The S$SV will be removed prior to stimulation and reset
after the job at 2020'.
9090'-9116' BKB (Re.f. BHCA/GR, 5/22/82)
9120'-9147' BKB ( " )
14 I f mg ~s true and correct to the best of my knowledge
S,gne~,~/ '~O~./,~ ~ ~ ¢~ T,tle District Petrole~ Engineer
The ~ bel;w ,~r ~mm,ss,on use~
Condlnons of Approval, if any
Date
Approved by.
Approved Cop~
Rr,~turned
By Order of
COMMISSIONER the Corniness,on
Date
Form 10-403
Rev 7-1-80
Submit "intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
SF0
AB. CO
CHEVRON
31 1 1 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
TO SFO/UNIT/STATE:
(-Marathon)
CENTRAL
EXXON
GETTY
MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only) _
FILES (CC#'s - Transmittal Only)
8/16/83
Date:
Trans.#: -
CC#: 74652
REFERENCE:
FINAL DATA - PRESSURE SURVEY DATA~
Ilowing material is being submitted herewith. Please acknowledge receipt by signing a
this letter and returning it to this office:--
B-18// Pressure Survey & BHPD 7/18/83 Camco
B-19J' " " " " 7/26/83 Otis
B-20j " " " " 7/28/83 Otis
B-21/ " " " " 7/30/83 Otis
B-22~ " " " " 7/17/83 Otis
B-23~ " " " " 7/16/83 Camco
D-16j Stat£c Report 7/27/83 Camco
D-21 " " 8/01/83 Camco
D-22j " " 8/08/83 Camco
D-23 j " " 8/04/83 Camco
M-5j~ Pressure Survey 8/03/83 Otis
X-7Y Pressure Survey & BHPD 7/24/83 GO
~/82)
RECEIVED
DATE
,, mmi$$[j~evelopment Geology
A~aS;i:n,l & Gas~;ons, Go ~ell Records TP1-5
-" A,~ch0m~e
SOHIO ALASKA PETROLEUM COMPANY
S?O
ARCO
- CHEVRON
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
~o SFO/UNIT/STATE:
(-Marathon)
EXXON
GETTY
MOBIL
PHILLIPS
7/26/83
Date:
Trans. #: -
74603
CC#:
STATE
BPAE (Transmittal Only) _
CENTRAL FILES (CC#'s - Transmittal Only)_
REFERENCE:
SO~LI~FINAL DATA - PRESSURE SURVEY DATA
/cTohfollowing submitted herewtth. Please acknowledge receipt by signing a
material
being
y of this letter and returning ~t to this office:--
A-29f BHPD & Pressure Analysis 6/01/83 , Camco
B-18'-~ Pressure Survey 7/07/83 Otis
B_19L~ ,, " 7/05/83 Otis
B-20" " " 7/09/83 Otis
B-21~ HP Pressure Analysis 7/11/83 Camco
B-22 .- ~ " " " 7/03/83 Camco
B_23~J ,, " " 6/25/83 Camco
D-6~ Pressure Survey 7/12/83 Otis
G-3 J"~ " " 7/12/83 GO
Q-3~ HP Pressure Analysis 7/07/83 Camco
R-10 / HP Pressure Analysis 7/08/83 GO
R-16/ BHPD & Pressure BU Survey 6/6-7/83 Dres
X-3--~ BHPD & Pressure Analysis 6/20/83 Camco
X-9 / BHPD & Pressure Survey 6/04/83 GO
X-16/ BHPD & Pressure Survey 5/18/83 Otis
X-17z Pressure Survey 5/11/83 Otis
X-17 BHPD 5/24/83 Otis
X-17 Pressure Survey 5/22/83 Otis
Y-2~ BHPD & HP Pressure Analysis 5/15/83 Camco
Y-6/ Pressure Data 7/07/83 GO
:4/82)
RECEIVED
DATE
Victoria Aldridge
Development Geology
Well Records TP 1-5
SOHIO ALASKA PETROLEUM COMPANY
3111 ' C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
July 20, 1983
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well B-18 (34-30-11-14)
Enclosed, in duplicate, are the following forms for the above-named
well.
le
e
e
GJP/J~H/pjw
Enclosures
cc:
Form 10-407, Completion Report;
Form 10-403, Sundry Notice and Reports on Wells;
Form 10-404, Monthly Report of Drilling and Workovers.
ly,
'G J~ P isga ~
Distrzct Petroleum Engineer
J. D. Hartz
Geology
Well File #17
ECEIVED
Anchorage
WELL COMPLETION OR RECOMPLETION REPORT AND LOG -
1 Status of Well Classification of Service Well
OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name'of Operator .......... 7 Permit Number
Sohio Alaska Petroleum Company 82-2 /
3. Address .......... 8 APl I~lumber .....
Pouch 6-612, Anchorage, Alaska 99502 50_029-20702
4 Location of well" at surface 9 Unit or Lease Name
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, OPM (corrected) Pcudhoe Bay Unit
At Top Produc,ng Interval top of Sag R. SST. ~o W~lI Number -
388' NSL, 1618' WEL, Sec. 30, TllN, R14E, OPM B-18 ..(34-30-11-14) PBU
,,
At Total Depth 11 Fmld and Pool
485' NSL, 1431' WEL, Sec. 30, TllN, R14E, OPM Prudhoe Bay
5 Elevation ~n feet (ind~cate KB, DF, otc ) 6. Lease Designation and Serial No Prudhoe ~il Pool
KBE = 73.75' AMSL ADL 28310
12 Date Spud;led 13 Date T D Reached 14 Date Comp. Susp or ~'l~'and ('i5 Water Dep~:h. ,f offshore 16 No of comPiet;0ns
5/11/82 5/21/82 5/25/82 ,I .. feet MSL .... Pile
17"TotaiDepth(MD+~vO) 18 PI~'g Back Depth (MD+TvD) 19 D,rectl0naISurve¥ I 20 Depth where SSSV set I 21 ThlcknessofPermafro'~t '"
9410'ND 9239' ~WCD 9338'ND 9169'~'v'D YES ~ NO [] 2020 [ feet MD ~ ~
22. Type Electric or O~her Logs Run
.DIL/BHCS/GR/SP, CBL/VDL/CC~/GR, Gyroscopic survey ........ - ....
23 CASING, LINER AND CEMENTING RECORD
'S'ETTING DEP'I~H MI} ............
CASiNGSIZE,WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" x '~0"Insula'te~lC~au~.~l -~,,~f.~c,. ...... 110"' 3~" 8 cu.yds, con. crete
13 3/8" 72# L-S0 S,lrf_~ .... 269~6' 17 ]/O"i ~gn ~=~11 ~" ~'~=~--e=eJkt"' II . ..
9 5/8" 47# .... L~80 Surfac~ 8585.' 1~' 174~ [i55,, cu. Zt.. Class G. .
.. 130 cu. ft. Arcticset[ I
7" 26~ L-80 808(~' .i g4{3_K' 8 1/2" 390 ~%Aeft- Class G ~/iR~
24. Perforat,ons open to Production (MD+TvD of ToP"and Bottom and 25 ' TUBING RECORD
,nterv.l. s,ze and number) ~ ~lrDss SiZE '" E~EPTH SET' {~'D) .~KER SET (MD) ....
- 5 1/2" .......8136i ..... ' .... ' ' 71~'93' .......
Prudhoe Oil Pool top: 9090' 8856, ...............
Bottom: 9147' 8911' 26 .... AC'ID, FRA'CTURE,'CEMENT SQUEEZE, ET(~ .........
DEPTH INT'E'RVAL (MD) 'AMOUNT ~&'I~IN6 bF MATERIAL USED
9090' - 9116 ' BEB (8856 ' - 8881 ' T'v'Dss) .................... _'
9120' - 9147' BKB (8885' - 8911' ~%~DSS) .............................
27 PRODUCTION TEST
Date F,rst Product,on Meth°d of Operat,on iFl°wmg, gas hft, etc.)
June 29, 1983 . I Flowing
-Date o~'T'Bst HOURS Tested PRODUCTION FOR~ OIL-BBL GAs-M~F WATER-BBL CHOKE S ' Z EI GAS-OIL RATIo
iTEST PERIOD I~ , .
Fllo~ TublIIng Casing P;essure II cALCuLATED OIL-I~BL GAS'McF WA~EIR-BBL 'lOlL ~RAVITY-API '(corri ...................
Press. 24-HOUR RATE
28 ............. corE DATA .......................
Brief description of hthology, porosity, fractures, apparent dips an'~l presence of oil, gas or ware r submit core chips.
.oneQECE ¥ED
Atas~a 0d & Gas Coas~ ~ornrn~$ior~
A~chorage
......................
Form 10-407 Submit m duplicate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
29 30
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all flu,ds recovered and gravity,
MEAS DEPTH TRUE VERT DEPTH GOR, and t~me of each phase
BKB Subsea
Sag River SST. 8630' 8414'
Shublik 8660, 8443, :.
Ivishak 8740 ' 8519 '
31 LIST OF ATTACHME~ITS
None / ~-~,
3:2 I hereby cert~f~ that ~he foregolng~ true and correct to the best c~f my knowledge
/ ,' - ~ ' .- -)
S,g.~/ / '¢..L.L.~ (~¼lt~2~% TmeDistr. petroleum Date -9
f G.' J. Pli,Sga ~/ ,:nglneer
I NST R UCTI ONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given ~n other spaces on this form and in any attachments.
Item 16 and 24: If th~s well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such ~nterval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas L~ft, Rod Pump, Hydraulic Pump, Submersible, Water In-
iectlon, Ga~ Iniect~o~, .q.F,,. ~_~. OtSer-explain
STATE OF ALASKA
ALASKA ( _ AND GAS CONSERVATION C([ MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
'1
2. Name of Operator 7 Permit No.
Sohio Alaska Petroleum Compar,~ 82-2
3. Address 8. APl Number
Pot.cb 6-61£, ;~,r~ct~c~g~ ~3_~l~a _c,.c'50;' S0_029-20702
4. Location of Well
At Surface:
344' SNL, 1892' WEL, Sec. 31, TllN, R14E
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
B-18 (34-30-11-14)
5. Elevation in feet (indicate KB, DF, etc.) J 6. Lease Designation and Serial No.
KBE = 73.75' AMSL J ADL 28310
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
PBU
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit ~n Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] . Perforations r-~ Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
[]
(Note. Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals were perforated June 29, 1983, using Dresser Atlas
3 1/8" carrier guns at 4 s.p.f.
A lubricator was installed and tested to 3500 psi on all well work.
9090' - 9116' BKB (Ref. BHCA/GR, 5/22/82)
9120' - 9147' BKB ( " )
An SSSV was set and tested in the ball valve nipple at 2020'.
14. I hereby ~e~~egolng is true and corr~t to the best of my knowledge.
/ /
S.gn~/~~J ~~ TltleDiStriCt Petroleum Engineer Date 7/~/~
· / '
Condmons of A~val, ~f any
By Order of
Approved by COMMISSIONER the Commission Date
Form 10-403
Rev 7-1-80
Submit "Intentions" in Tnphcate
and "Subsequent Reports" in Duplicate
ALASKA OIL AND GAS CONSERVATION C MMISSION ---
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS J
I Drdlmg well ~ Workover operauon r-I
2 Name of operator 7 Permit No
Sohio Alaska Petroleum Company 82-2
3 Address 8 APl Number
Pouch 6-612, Anchorage, Alaska 99502 50_029-20702
9 Umt or Lease Name
Prudhoe Bay Unit
4 Location of Well
at surface
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, UPM
5 Elevation m feet (~ndtcate KB. DF. etc )
KBE = 73.75' AMSL
6 Lease Des,gnat,on and Serial No
ADL 28310
For the Month of July ,19 83
10 Well No
B-18 (34-30-11-14) PBU
11 F,eld and Pool
Prudhoe Bay
Prudhoe Oil Pool
12 Depth at end of month, footage drdled, f~sh,ng jobs. d~rect~onal drdhng problems, spud date. remarks
13 Castng or hner run and quantities of cement, results of pressur9 tests
14 Coring resume and brtef descrtpt~on
15 Logs run and depth where run
1 6 DST data, perforating data, shows of H2S, mtscellaneous data
See Attached
17 I here ha g ,s true and correct to the best of my knowledge
SIGNED//
'" f TITLE Distr. Petroleum ~.ngineeroATE .
NOTE--Freport on t~,s~orm ts requged for each calendar rn°n~h, regardless 0,' the s~atus of operat',ons, and must be f,le~V~m du'(cate w,,h the Alaska
Od and Gas ConserVa~T0n Commtsston by the 15th of the succeeding month, unless otherwise d~rected
Form 10-404 Submit ~n du0hcate
Rev 7-1-80
PERFOPATING DATA - Well B-18 (34-30-11-14) PBU
June 26, 1983:
Pressure ~ested tubing and inner annulus.
June 29, 1983:
Rigged up Dresser Atlas and perforated the
following intervals using 3 1/8" carrier
guns at 4 spf:
9090' - 9116' BKB (Ref. BHCA/GR, 5/22/82)
9120' - 9147' BKB (Ref. BHCA,GR, 5/22/82)
Put well on production.
July 5, 1983:
Shut well in to prepare for static pressure
survey.
July 7, 1983:
Ran static pressure/temperature survey at
8800' TVDss.
July 8, 1983:
Set and tested SSSV in ball valve nipple at
2020'.
Well on production.
SOHIO ALASKA PETROLEUM COMPANY
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
3111 'C STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
May 9, 1983
Attention: Mr. C. V. Chatterton
Wells B~18 t~rough B-23 and B-25, C-18 through C-28, and
D-16 through D-23 (excluding D-19)
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named wells. This contains our proposal to
perforate these wells.
GJP:JLH:pjw
Enclosures
CC: J. D. Hartz
Geology
Well File #17
._Dist~ Petroleum Engineer
RECE VEO
MAY }L 2 983
O~ & Gas Cons. 6ommiss!o~
Anchorage
STATE OF ALASKA
ALASKA O~ AND GAS CONSERVATION CC( ~llSSION
SUNDRY NOTICES AND REPORTS ON WELLS
I DRILLING WELL []
COMPLETED WELL []
OTHER []
2 Name of Operator 7 Permit No.
Sohio Alaska Petroleum Company 82-2
3 Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20702
4. Location of Well
At Surface:
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, UPM
5 Elevation in feet (indicate KB. DF. etc.)
KBE = 73.75' AMSL
6. Lease Deslqnatton and Serial No
ADL 28310
9. Umt or Lease Name
Prudhoe Bay Unit
10. Well Number
B-18 (34-30-11-14) PBU
11. F~eldandPool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit tn Trtphcate) (Submit ,n Duplicate)
Perforate I-~ Alter Casing [] - Perforat,ons [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pull,ng Tubing []
(Note. Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and g,ve pertinent dates, mclud,ng estimated date of starting
proposed work, for Abandonment see 20 AAC 25 105-170)
The following intervals will be perforated during June/July, 1983, using 3 1/8"
carrier guns at 4 spf. A lubricator will be installed and tested to 3500 psi
for all well work.
9090' - 9116' BKB (Ref. BHCA/GR, 5/22/82)
9120' - 9147' BKB ( " )
9156' - 9166' BKB ( " )
An SSSV will be set and tested in the ball valve nipple at 2020'.
*Contingent interval, to be perforated if well will not sustain flow.
RECEIVED
MAY 1 2 1983
er~~th~'~~e ~[tyo~m No./~C-~ D~t~ Alaska 0il & Gas Cons. Commission
S~.~t W o'k G~o~te~ ~~~ Anchorage
14 I h going ~s true and corr~t ~o the best of my knowledge,
· ~e ~e~o~ ~r C~,~,on u~
Condmons of Ap~, ~f an~
ORIGINAL $1Gfl£9
8Y LOTl;',1E C. SMITH
Approved by COMMISSlONER
Approved Copy
Returned
.5'../3 .
By Order of
the Commission
Form 10-403
Rev 7-1430
Submit "Intentions" in Tnphcate
and "Subsequent Reports" ,n Duphcate
(
SOHIO ALASKA PETROLEUM COMPANY
OFFICE CORRESPONDENCE
TO. Bill Vail Ale/1 DATE 3-10-83
FROM Anne Jones cc NO
Well ~cords, DeveloFment Geology
SUBJECT YOUR REF
Magnetic Tape listing
Enclosed is a copy of the program verification listing for
well B-18. Our apologies for not sending this to you.
Anne Jones
Well Records
Development Geology
AK3407-1 (7/81) s/s AK1009 OS
SOHIO ALASI;,", PETROLEUM CO;'.":PAr~Y
ARCO
lO.
EXXON
PHILLIPS
CENTRAL FILES(CC#' s-Transmittal Only_
124109
3111 "C SIqEEI
AI,'CHOI{AG[, ALASKA
1ELEPHONE 1907) 265-0000
MAIL' POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 1-12-83
Trans.#: 2005__
CC~: 56005
REFERENCE:
MAGNETIC LIS TAPES & LISTINGS
he following material is being submitted herewzth. Please acknowledge receIpt by signing a
copy of this letter and returning it to this office:--
~d * B-18 0.~ DIL/BHC/AL/Cg~C~ 5/22/82 t/- 1317
:ected * ~12 CH CN/q~ ~1/82 ti- 1341
Tape Pos.~~~
-- 02105 Dre~
01817 Dr~s.
lCi~tjng above means you should hav~
*SFO: . An Asterisk:(*) next to a ~'~/o}z e respective service co-~any.
received the Tape(s)an ,~L~i~g($) directly
Please confirm this. ~
R~CEZV[D ................ ~:;~'"~[~,~. /"~' ~ Development Geology
~ ;as Lj,"~ Well Reco rd s
..... - ............
"~t0~I
SOHIO ALASI;A PF. TROLEUM CO;:~PANY
SFO
ARCO
EXXON
TO
PHILLIPS
CENTRAL FILES (CC#' s-Transmittal Only
3111 ' C SlqEET
;,fdCHORAG£. ALASKA
TELEPHONE (907) 265-0000
MAIL' POUCH 6-61 2
ANCHORAGE, ALASKA 99502
Date: 1-12-83
Trans.#: 3005
CC#: 56005
]orrected * B-18
Copy)
Corrected * J-12
Copy)
REFERENCE:
/~~IO ~GNETIC LIS TAPES & LISTINGS
,~e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Tape Pos.
OH DIL/BHC/AL/CD/CN, 5/22/82 #- 1317 02105 Dres.
CH CN/GR 6/11/82 #- 1341 01817 Dres.
a/82)
*SFO:
· ,
received the Tape(s) an~tj, ng(~)~.rectly
Please confirm this.
RECEIVED ..........
An Asterisk:(*) next to a listing above means you should have
from the respective service company.
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 C' STREET
ANCHORAGE ALASKA
TELEPHONE (907) 276 5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
July 8, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Well B-18 (34-30-11-14) PBU
Enclosed find final well logs for the above-named well.
These were not available at the time Form 10-407, Well
Completion Report, was sent to you on June 25, 1982
Very truly yours,
District Drilling Engineer
RHR:MM:yr
Enclosures
cc: Well File #17
Geology
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO'
CHEVRON
EXXON .
3i 11 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE 19071 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
zo: SFO/UNIT/ GETTY
.
STATE: MARATHON
MOBIL
PHILLIPS
*STATE OF AK
BPAE (Transmittal Only)
.EFEREN~NTRAL FILES(CC#'s-Transmittal Only)
Date:7-7-82
Trans.#: 1703
CC#: 49703
* Date to State
Via Drilling: 7-7-82
(surveys- 6-24-82)
The SOHIO OPEN HOLE ,FINAL LOGS
following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
S FO / UNIT / STATE:
,.
B-18 Dres DIFL #1 5-22-82 5"
B-18 Dres BHC #1 5-21~82 5"
B-18 Dres CDL/GR #1 5-22-82 5"
B-18 Dres CDL/CNLog/GR #1 5-22-82 5"
B-18 Dres GR #1 5-22-82 5"
& 2"
& 2"
& 2"
& 2"
& 2"
STATE ONLY/ p'/~('~/~_~ _DIRECTIONAL SURVEYS: ~ 5-14-82 to
/ Magnetic Single Shot ?irectional Survey J Date= 5-23-82 Job#: 0582-023
( Gyroscopic Directional Survey j Date: 5-29-82 Jobt/: Boss-16039
- "--- ,, ,
--D'%/ ,v- - ! u--~-'- ~UL - 8 1~o~ Development Geology
o^Tc Mz~k.~ 0it & ~s O~n~. Commission Well Records
knchorage
(
SOHIO ALASI~P, PETROLEUM CO;':"..PANY
SFO
ARCO
EXXON
PHI LLI P S
CENTRAL FILES(CCtt's-Transmittal Only
31 1 I "C ' STqEET
ANCHORAGE, ALASKA
TELEPHONE {907) 265-0000
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
Da te: 6-30-R2 .
Trans.t!: 1690
CC//: 49690
',/82)
REFERENCE:
SOHIO MAGNETIC LIS TAPES & LISTINGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
, Ta~e Pos.
j-5/
6/12/82 OH-DIL/BHC/FDC/CNL/GR 65227 01804
6/10/82 CH-CNL 64216 01805
5/31/82 CH-CNL 65173 01806
5/29/82 CH-CNL 65200 01807
5/24/82 OH-DIL/BHC/FDC/CNL/GR 65205 01808
5/30/82 CH-CNL 65172 01809
6/11/82 CH-CNL 65215 01810
· 6/12/82 CH-CNL 65217 01811
6/11/82 CH-CIqL 65220 01812
6/10/82 CH-CNL 65221 01813
6/11/82 CH-CNL 65222 01814
5/18/82 CH-CN Multispaced ECC '1307 01815
5/22/82 OH-DIFL/CDL/BHC/CN ECC 1317 01816
6/11/82 CH-CN Multispaced 'ECC 1341 01817
*SFO & EXXON: An Asterisk:(*) next to a listing above means you should have
received the Tape(s) and Listing(s~[~'.e~T~.~rom
the
respective
service
company·
/ ~~1/~,
~9 We~Z Records
DATE ,~,c~,~ ~ ~; "' .~-~ , -'- , '
b~,i~o. L '."r'~;~0q
/ ,/ 1,
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
June 25, 1982
Alaska Oil & Gas Conservation Corm%ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
Well B-18 (34-30-11-14) P.B.U.
Enclosed in duplicate is Form 10-407, Completion Report,
for the above-named well together with the Well History and
Directional Surveys. Well logs printing/processing has been
delayed and they will be forwarded under separate cover
when received.
This well has been completed as a non-perforated oil well.
Very truly yours,
RHR:jm
encs
Well File 917
Geology
District Drilling Engineer
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Service Well
OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2 Name of Operator 7 PermIt Number
Sohio Alaska Petroleum Company 82-2
3 Address 8 APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20702
4 Location of well at surface 9 Umt or Lease Name
344' SNL, 1892' WEL, Sec. 31, TllN, R14E, UPM (c~. Prudhoe Bay Unit
At Top Produc.ng Interval top of Sag R. SST.LU~^i~U~l 10 Well Number
VERIFIEDI
388' NSL, 1618' WEL, Sec. 30, TllN, R14E, UPM~ . B-18 (34-30-11-14)
At Total Depth Sur[ ~_--~----t 11 F~eld and Pool
485' NSL, 1431' WEL, Sec. 30 TllN, R14E, UPM B.H~_J~---J Prudhoe Bay
1 '
5 Elevation ~n feet (md~cate KB, DF, etc ) 6 Lease Demgnat~on and Semal ~o Prudhoe Oil Pool
F~E = 73.75' A~S~, ADT, 28310
12 Date Spudded 13 Date T D Reached 14 Date Comp , Susp or Aband I 15 Water Depth, ~f offshore 116 No of Completions
5/11/82 5/21/82 5/25/82I feet MSLI one
17 TotalDepth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 DirectlonalSurvey I 20 Depth where SSSV set I 21 Thickness of Permafrost
9410'MD 9239'TVD 9338'MD 9169'TVD YES~ NO[]I 2020 feetMDI 2095'
22 Type Electmc or Other Logs Run
DIL/BHCS/GR/SP, CBL/VDL/CCL/GR, Gyroscopic survey
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT PER FT GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated ConductorSurface 110' 36" 8 cu.yds, concrete
· .
13 3/8" 72# L-80 Surface 2696' 17 1/2" 3720 cu.ft. Arcticset II
,
9 5/8" 47# L-80 Surface 8585' 12 1/4" 1155 cu. ft. Class G;
130 cu.ft. Arcticset I
7" 26# L-80 8080' 9405' 8 1/2" 390 cu.ft. Class G ~/18% salt
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None 5 1/2"" 8136' 7993'
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
27 PRODUCTION TEST
,
Date F~rst Production I Method of Operation (Flowing, gas I~ft, etc )
I
,
,Date of Test Hours Tested PRODUCTION FOR el L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-el L RATIO
TEST PERIOD II~
, ~
Flow Tub~.,ng Casing Pressure CALCULATED .k OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press 24-HOUR RATE
.... 28 CORE 'DATA
-Brief descmptlon of I~thology, porosity, fractures, apparent dips and presence of od, gas or water Submit core chips
None RECEIVED
JUN 2 5 982
A!3$ka. Oil & Gas Cons. Commismon
Anchorage
Form 10-407 Submit ~n duplicate
Rev 7-1-80 CONTINUED ON REVERSE SIDE
__
29 30
GEOLOGIC MARKERS FORMATION TESTS
NAME Include mterval tested, pressure data, all fluids recovered and gravity,
MEAS DEPTH TRUE VERT DEPTH GOR. and tlme of each phase
BKB Subsea
Sag River SST. 8630' i' 8414'
Shub lik 8660 ' 8443 '
Ivishak 8740 ' ' 8519 '
31 LIST OF ATTACHMENTS
Well History, Well L_ogs, Directional Surveys
S:2t2/~,~ I hereby cert~f~ that the foregomg ~s true and correct to the best of my knowledge
S,gned T,tle District Drilling Date ~-- b~ < ~
R. H. Reiiey Engineer
INSTRUCTIONS
General This form ~s designed for submitting a complete and correct well completion report and log cn
all types of lands and leases in Alaska.
Item 1 Classification of Serwce Wells: Gas injection, water injection, steam ~njection, a~r injection, salt
water disposal, water supply for injection, observation, injection for in-s~tu combustion.
Item 5 Indicate which elevation ~s used as reference (where not otherwise shown) for depth measurements
g~ven ~n other spaces on th,s form and in any attachments.
Item 16 and 24. If th~s well ~s completed for separate production from more than one interval (multiple
completion), so state ~n item 16, and in item 24 show the producing intervals for only the interval reported
in ~tem 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such ~nterval
Item 21 Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23 Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27 Method of Operation
Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
WELL B-18 (34-30-11-14) PBU
WELL HISTORY
Spudded well at 2100 hours, May 11, 1982. Drilled 17 1/2" hole to 2700'.
Ran 68 its. 13 3/8" 72# L-80 Buttress casing to 2696'. Cemented with 3720
cu.ft. Arcticset II cement. Installed and tested BOPE. Cleaned out to
2652'; tested casing to 3000 psi, okay. Drilled out to 2737'; ran leak-off
test to 0.84 psi/ft, gradient. Directionally drilled 12 1/4" hole to 8600'.
Ran 222 its. 9 5/8" 47# L-80 Buttress casing to 8585'. Cemented in two
stages: First stage with 1155 cu.ft. Class G cement; second stage through
D.V. packer at 2607' with 130 cu.ft. Arcticset I cement preceded by Arctic
Pack. Cleaned out D.V.; tested casing to 3000 psi, okay. Cleaned out
float equipment and directionally drilled 8 1/2" hole to 9410'. Ran open
hole logs. Ran 33 jts. 7" 26# L-80 IJ4S liner to 9405'. Cemented with
390 cu.ft. Class G cement with 18% salt. Cleaned out to 9338'; tested
casing to 3000 psi, okay. Changed well over to NaC1; ran CBL. Ran 180
jts. 5 1/2" 17# L-80 A/B mod. Buttress IPC tubing to 8136'. Landed tubing
with ball valve at 2020'. Installed and tested tree. Displaced tubing to
diesel. Set packer at 7993'. Tested tubing to 3500 psi, okay. Released
rig at 0730 hours, May 25, 1982.
RECEIVED
AI~ska Oil & Gas Cons. Cu,.m;smorj
Anchorage
SOHIO ALASKA PETROLEUM
PAD- B (:34' :.'50- II- 14)
B'I8
Controlled
Drilling
Consultants
LES HENDERSON
349-3114
7608 Highlander Drive
Anchorage, Alaska 99502
(907) 349-3114
May 24, 1982
Mr. Brian Rose
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
RE~ Magnetic Single Shot Survey
Job No. 0582-023
Well B-18 (34-30-11-14)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: 5-14-82 to 5-23-82
Dear Mr. Rose:
Please find enclosed the "Original" and six (6) copies of our
Magnetic Single Shot Survey on the above well. The method used
in calculating this survey was Radius of Curvature. The depth
of the survey was 5716 to 8530.
Thank you for giving us this opportunity to be of Service.
Yours very truly,
Controlled Drilling
Les Henderson
Directional Supervisor
COHPLETION REPORT
SOHIO A L A S K A "-F~i~SL E-U M .........
MAGNETIC SINGLE SHOT SURVEY
RADIUS OF CURVATURE METHOD OF COMPUTATION
RECORD OF SURVEY
21 MAY 82
WELL B-18(34-30-11-14)
KB. ELEV. 73.75
TRUE
HEA$;-D~.~TVE~TZC~L -
DEPTH ANGLE DEPTH
D M
0 0 0 , O0 -73,75
SEA DIREC
DEG.
N , OOE
6668 21 30
6975 21 0
.... 7'410 '-1-~'-'" 0
79'4~I 16 O
82~;2 1 ~ 3 0
85:3'0 17-:30
6629,9i 6556, 16
6916,03: 6842,28
783t.i4 7757.39
8129,72 8 055.97
5716. O0 5642.25 N · OOE
"56q5~;~ --5'~';~I7 ..... N -4.00E
5946,34 5572.59 N 3, OOE
N 3.0OE
N-5. OOE
N 6.00E
N 5,50E
Ht-i; OOE
N27. O OE
N41, OOE
N~. O OE
BOTTOM HOLE CLOSURE 809,11 FEET AT N
TOTAL COORDINATES
,00 S .00 W
,00
9,03
23,88
61
I20,40
2.46,54
357,25
5O4.43
654.89
726.86
78 O. 57
S .00 W
N .32 E
N J.22 E
N 3.15 E
N 7.32 E
N 19.47 E
N .30.61 E
N 51.95 E
N 1 03.76 E
N 1.52.31 E
N 2i.3.01 E
15 15 49 E
CLOSURES
DISTANCE ANGLE
D M
.OO S 90 0
S
0 W
.00 S 90 0 0 W
9.03 N i 59 59 E
23.91 N 2 55 59 E
120.63 N 3 28 45 E
247.31 N 4 30 52 E
358.56 N 4 53 52 E
507.09 N 5 52 49 E
663,06 N 9 0 1I E
742.65 N 1t 50 4 E
809.11 H 15' 15 49 E
DOG LEG
SEVERITY
DEG/!OOFT
,000
.000
5.070
5.337
2.229
1.888
,619
.164
.479
.610
.397
.~06
DISTANCE
,00
23.36
118.0~'
242,97
352,71
65:
74 t. 32
S 09. fl-
SINGLE SHOT SURVEY
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH.
TRUE
MEASURED VERTICAL SUB MD-TVD
DEP TH ......... DEP TH SEA -'-D-i~-~-ERENCE
VERTICAL
CORRECTION
TOTAL COORDINATEB
174 ........ i~: .......... fd'O - 0
274 274, 200 0
374 374. 3O0 0
4~4 -- ~7-4-, 400 - 0
574 574. 500 0
674 674. ~00 0
874 874. 800 0
974 974~ 900 0
i-074 ........ TO-dO4, 1000 - 0
1174 1174. 1100 0
1274 t274. 1200 0
0
1474 1474, t400
1574 1574, i500
1774 t774. 1700
1874 1874. 1800
2074 2074. 2000
2t74 2174. 21 O0
2274 227-4.
2374 2374. 2300
2474 2474. 2400
2674 26?4,
2774 2774. 2700
2974 2974. 2900
30?4 3074. 3000
317~ ~74-.- 3100
3274 3274. 3200
3374 3374. 3300
~4-/~ -- 3474. --~3~-00
3574 3574. 3500
.00 S
.00 $
,00 S
,00 S
.00 $
.00 ~
.00 S
.00 S
,00 S
.00 S
,00 S
.00 S
,00 S
.00 $
.00 $
.00 S
.00 S
,00 ~
.00 S
,00 S
,00 S
,00 S
,00 S
.00 S
.OO $
,00 S
,00 S
,00 S
,00 S
.00 S
.00 8
.00 S
.00 S
,00 $
.00 S
.00 W
,00 W
.00 W
,00 W
,00 W
,00 W
,00 W
.00 W
.00 W
.00 W
,00 W
,00 W
.00 W
.00 W
.00 td
~00 Ed
.00 W
.OO W
.00 W
.00 W
,00 W
,00 W
,00 W
,00 W
.00 W
.00 W
.00 W
.00 W
,00 W
,00 W
,00 W
.00 W
.00 W
.00 W
,00 W
SOHIO WELL B-I8
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN
TRUE
NEASURED VERTICAL SUB HD-TVD
DEPTH " DEPT~ -~BA DfFFERENCE
SINGLE SHOT SURVEY
100 FEET OF
VERT I OAL
CORRECTION
SUB SEA DEPTH,
TOTAL COORDINATES
21
MAY 82
3674 - 3674, ---3600
3774 3774, 3700
3874 3874. .3800
4074 4074. 4000
4174 4174, 4~00
4374 4374, 4300
4474 4474, 4400
4674 4674, 4600
4774 4774. 4700
4974 4974, 4900
5074 ~OF4, 5000
~7~ '5'174'. --S f 00
52?4 5274, 5200
5374 53~4 , 5300
5S74 5S74. 5S00
5674 5674. 5600
~74~ S~,
5874 58?4, 5~00
5976 5974, 5900
6~83 6174. 6t O0
6288 6274, 6200
650~ 6474. 6400
6608 6574, 6500
6822 ~F?4, 6700
~9~0 6874. 6800
-7037 ...... 697 4, ~ ~-00
7144 7074, 7000
0 0 ,00
0 0 ,00
0 0 .00
0 0 ,00
0 0 .00
0 0 ,00
'- 0 0 ,00
0 0 ,00
0 0 .OOS
0 0 ,00
0 0 .00
0 0 ,00
0 0 .00
0 0 .00
0 0 .00
0 0 .00
0 0 ,00
0 0 ,00
~' 0 0 .00
0 0 .00
0 0 .00
0 0 1.48
0 0 11.06
2 2 29.85
5 3 54,33
9 4 82.92
t4 5 115.25
20 6 150,45
27 7 186,96
33 6 2,24,75
- 4! 8 263.69
48 7 302.54
55 7 341,06
63 8 37'.3.1[ .3
69 6 416,18
.00 I~
.00 W
.00 W
.00 W
.00 W
.00 W
,00 W
.00 W
.00 W
,00 W
.00 W
.00 W
,00 W
.00 W
.00 W
,00 W
.00 W
,00 W
,00 W
,O0 W
,00 W
,02 E
,45 E
1.54 E
'2.82 E
4,47 E
6.89 E
10.02. E
1.3,46 E
~7.22 E
2t.26 E
25,23 E
29,0:5 E
32.87 E
37,39 E
SOHIO WELL B-iS SINGLE SHOT SURVEY
MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET
TRUE
MEASURED VERTICAL SUB MD-TVD VERTICAL
DEPTH ..... DEPTH SEA-~D-I~-~ERENCE CORRECT I ON
7462 7374, 7300
7672 7574, 7500
7777 7674, 7600
7985 7874, 7800
eoee ?'~z4, zeoo
~4 ............. ~ 074'; ~-~'0
8298 8~ 74. 81 O0
8402 8274, 8200
OF SUB SEA DEPTH.
TOTAL COORDINATES
452, 16 N
487,05 N
520,80 N
553.07 N
583,75 N
612.75 N
640, 03 N
665,72 N
690,44 N
714, I3 N
736,57 N
757, SO N
42., 66 E
48,64 E
55,37 E
63,50 E
73,11 E
84.07 E
96,26 E
1 09,52 E
124,57 E
14'I .77 E
161.12 E
183.01 E
207,3:8 E
2t MAY 82
SOHIO WELL B-18
8INGLE SHOT SURVEY
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH,
HEASURED
D-i~P--T-~
TRUE
VERT i CAL SUB
TOTAL COORDINATES
1 000 ! 000, 926° . O0 ::3
~rO-OD- ....... -20-00. !9-247, , O0 $
3000 3000. 2926, ,00 8
4000 4000, 3926, ,00 S
6000 5997, 5923. 35.19 N
7000 6939. 6866, 366,14 N
.00
,00
.00
.00
.00
1,82
31.49
t11.50
June 1, 1982
Mr. Gary Plisga
Sohio Alaska Petroleum Conl0any
Pouch 6-612
Anchorage, Alaska 99502
Re:
Our Boss Gyroscopic Survey
Job No. Boss-16039
Well: B-18 (SEC31 TllN R14E)
Prudboe Bay Field
North Slope, Alaska
Survey D~te: May 29, 1982
Operator: Marvin Milam
Mr. Plisga:
Please finc enclosed the "Original" and sixteen (16) copies of our
Boss Gyroscopic Multishot Directional Survey on the above well.
Thank you for giving us this opportunity to be of service.
Sincerely,
NL SPERRY-SUN, INC.
Ken Broussard
District Manager
KB/pr
Enclosures
F'¢~GE t
Ii~A]'E OV -Z, UF<VEY MAY
jJLI':,':, I,~,¥11~.]'~ L I-Ir'l i[. '31JRVIEY
,_lOl:~ IxlLIHB~LR :BOS:S-:t
I'.I:LLY L~LI'£,IIZNC; ELEV.
7_::. 75 FT.
OPE [-,:A-F OF;:--M 1 LI:~P1
1
I '. ,'=,';
t~. c30 0. O0
0.1 '-~ E -0.64
(.). '3 :_:: I£ - J . ::,:":
0. '=,' F:, E. -'_::. 1 4
1. E:/1- E. -4·40
-' (:)J- E.
SC'I-t I 0 ALA _:;~. APE YR _,LE,.. P, C. AVIF'r-~I'.t;
r-i--} ::: ( 5_, E C' ':: .",. ] ~ I(t ~-,; 1,1 E ~ ....
r'fTiJj IHChr': E~ '¢
ALASI A
WELL '-~ '""" v (~IL:.~ L.U~IFANY
,JUNIE J, L'~U.'_'
VERTJ Ch'~L SECTICd~i CAI_C'ULh TED ALUNG,..~_,_,"' '-""_,,_.,=r.~"~"
F'AGE .2
DATE 01-- SURVEY MAY~:Y,-"- lO~q-'- ,_._
BOS, S C, YROSCOF'iC SLIRVEY
,_lOB NUMBER BOSS--160.39
I.'ELLY BU'_:,t~ING ELEV. =
Ot:'E~-~ TiSI (;-:~i I LAM
73.75 FT.
T u 7 ~L
RI.:C I'ANGULAI7 ~.' OuRI] ]: NATES
NORTi-I/:::F~LI 1'~1 EAST/NE.:,]
VERTICP~
SECT I 0,.
,)
t'-)
0. "-:0
C'. 14
O.
O. 25
0.34
(] ,,
-39.08
-39.56
-40.07 ....
-40.72
"l.t/ E
~'.o. ?1 E
20.2')
-42. _
-4 3.24
-44, 27
20. O0 k.
I'-). 67 E
I9.40 E
-44.93
-45 ~ 1
-46.22
l'y. 0::: E
I8.7,:.' E
,18.4'.? E
j,-, .=,:::
19,17 E
19. '~0 E
2u.22 E
:'o. 76 L
,_'1. 17 E
..... :-'i-:-F(':, E
-46.98
- 47.55
-47. '--/4
- 48.44
-49.03
-49.58
-50 · 04
-- 50.06
-4:3. ::,6
....... i -r_- ',-," L
-4~,. -.'5
ANC:I IORAGI.: AL h'.,I.A
"' _ ..... Tt
(;::l ,' T t C, l:_ ,z ':F CIN CAL C 11LA T ILO ;:L' Ii'II, I- I..C': Ur ': -
DATE ~'lF. ::,[_IF(VEY_ HAY ,~.~,"-"-
F'AGE
CIJlbtt-'l_l]","l'[ 1CIN [:ATE
II: I ' :,
,. ,.:NI. : i':':': "'
BOSS GYld)'.:,LOF'IL SLIRVEY
,Jl]D NLIPIBL.]F( GOS'_',- 160'--:'0
~.ELL',' [C.I':,H.TNG ELEV· =
OF'ERA FOR-M.[ LAM
7:' 75 Fl'
~l · ,,
Th:I.IF, '-,I IL'-:,EA L ('~!_tl ~".E,t..F
l'",-, -,: 1171. :'t VI_R: TF:"L tYlEr( F r ' "' ,,_
'-, L ~ :,_ t k~i- L I NAT [ Lh',l
~;-F' TI ~ F:EF"TH Er[j: 'Fl I DI-G t-I I N
::. OI IR'7,1. [ u'3~:-LEG '1 01 Al_
LI £1d_C i ,I :iN '?L VL'I? LTY F,'[.'CThNGULAk< C I u_iRLI INA FES
::Il.-Gl <[- I~'z, LIE b/t Uo NL'IR'FI ~/:E, OLI'[ H EA:z;T/WEF:T
VERT I C A.
· :,E -.T I Oiq
-39.5 I
-°2-,. 02
-13· O1
,:., 4 T,
:,_,. 13
64.45
97.02
I31,29
0, '" L/-, .-:, L-':'] l,l 4 c-,. 15 L-.'
C',"'7 200..::': hi 5O.5D E
O. 73 :'...',4,. '., ' lq 5,1.40 L£
165.
1 ':/9. o 1
-'33. 16
4:]:
"44 N 5:R (.).. E
27 ... _.
::~)7 7/., N 61 '- '=
. ,, _ ,. :;] ._1 E
342..:-:6 t'4 66. J3 E
L:/ 37o.0'v hi z(').'?3 E
0 ,,
I ,,
2::: 4(")'-?. / N /-' .... ,4 E.
,{:_] '4J.5t. N :3i:. :':/1. E
0.
0 ·
76 4.72..37: N 91 . .~':'" E
'.,'4 50 J · 7'3 N ',:~'y..30 E
Zl ,I- ~' ""
.-':,~.~. 04 N ] 07. '::~ E
3'-74. ':'/U
426. --:9
457 · 14
4P/ ::--.'3
':Z,
515.71
E
E
F
L
t.'_,'/ .L:,'_,/.OL: {I 1 LT.'Sly E
1,, 16, q:::::.6,7 N 1,:';.17 E
l. ::7 60L,. ':'.3 l:..l i 4._' · 49 E
1.06 62'P. 73 N 157. ,'::5 E
i.'30 651.60 I',l 17'3. o4 E
1 ,, .S'6 67 ;.:. ',-'/'? N .1 93 · 22 E
L ~
6 7
' '; C:
'q 4.04
72. U4
5'P'). 72
6...6. :::6
654.04
:B 2, 10
71 (') "=
· -2 _t
7.3'°. 32
7,"55. ,'-,4
-/,.%,t'~
F'AGF.: 4
982
[ I,;t. 1!- ':-'11,~ _ . _
";IS A':,UI,'~ 'L]VIER FtC6L VERI rc
, f ~. r hll. [ t NAT J l.'li',l Ii £ RlZr F f Olu
'-ri t Lff-_F' T1 ~ DEI-"I-I-~, tiE" r_~ t"l ! I',1 IIE. GF,'F.t. '-=,
_ .
,IAB hll.IM E415 I:(
f:ITLLY l=.:LIC, l-I] big E"LE~, =
c, pb R?\-~ i.;)i C I",f~ Lnl,1
73.7.5 FT.
I.,.~G Ir:o,
, ,I,:VI=R [ ]- 'r'
DEb/ 1.00
7 U] F~l..
t (rzc F/1Nc~IJLAI ( E OrjI (IJ I NAT Et:;
N 0 R T H / ':; 0 U TH12 ri c_, r / t4 E'_=; T
VERTICAu
SEL'T I ON
317, c,., E
i:4,:-'. 62 E
3o6.68 E
::'.-'/0. 08 E
,I1.,". ~11.
813.69
8o6, 84
..~.~
~46.83
948, 99
~t'_-~iR/Z¢¢I,I~';1L DF'E,I-'L,.~C. EP, I£11? ='-,i;' ,"' i,r~ I AF ~lr ,~'l-ll "'; l:l..f',. ,,[ fi[Pl, l:{y~,l-
rfl~- ,.ri'_i !.ii-it'l 1U,'l r-'RqC~;.,J~¢:'-, "',rTr~ t'r~";Ci, C. rr,~-'I]-IE U'E.E Cfi" 'rl ll:,,l=lZ ,[.~1}1[ J-xE:';:['Cilt,h'-"-',L RADII I:=; uk L'LIRVATLU:RE METHOD,
IC,~.,/1L,,L AL
F 'JI'iF'IJT;4 F1F!N Lh '~'I l-
,_il J I~I~_ L . L' ,; ,.'q -'
DA1% I)F '£,[tlRVEY MAY 29,
,JOB I~lLIhlUI IR
P. ELLY BU.':,I-I1NC~ ELEV, =
CIF'EI:Ri-I I-OR -M I LAM
PAGE
1
7B. 75 FT.
t')~,~, ....... r r:,. f OF ?u A':I q-'r:O._._..,, rt~'l''~..:,
PI U -.-T VEl
Li I F'FERENC, E
VI-- R r I I."AL
C'ORWEL'} .I. ON
c). 00
0.
, , , ~ .. " ........ I I'~F]N':':IONF~L R,d,II I':, FJl- L'I. IRVATLIFCE METHOD.
DATE F~r'_ ,,_,~v'~:. t MAY .~..",
[:'AGE
7i:. 75 FT.
INTERF:'FfL..,.':'~T,-r3 VOLL'Z'-b FOR EVi:'N
! 1
v EIR 1' I ~' Al_
F.C~RR[.IZ. f 1 O1'4
O, t')L~ O. 0:] O, O0
1
I
,_t[INI.Z J. ? ~ o5; "'
DATE OI .... L, LIRVEY MAY 29~
,_ FiB i',II_IMBLR BO':";'-],- 1/_:-,F) '..:'?
I:ELLY BLI':',1111'.113 ELEV. "=
t:: E:.l(,fl] [,.IR-MILAM
F'AGE 7
7,:-:. 75 FT.
%1 t!:',. · ,F ,"s ]'~ i't Al
~ ~7-i-:T 1-7 NO!-~711/':;OLI] t I 1Z,:~", 1 /ld[ :5 1 D [ I::FI£R-~-JxlCI~
',.,'Eli r IF'AL
C F[RI:,tEC'T 10iq
'5. :'.'", E 0.2::3 0.01
0.01
O. 02
O. 04
O. 05
O. 05
O. 05
}. I ~., [: O, 5'., O. O!5
7.,/,7 I' 0.5'? 0.04
-'. L:',:I f. 0 ,,/:," O. (..z,
DATE OF :£:URVEY MAY ~--~
dOD Nt.I ~,- , ' -,o
MF c..R BlISS- I/_-,0,:,~
k'ISLI_Y BIj'_:,I~ING ELEV. =
Cff':'E RA TOI';~-M I L ~1"!
PAGE
7:3.75 FT.
IN]LI;,'POLNFED VALLIES FOR EVEN 10o !:FF:'F IJt Stl ""'
' B-.:,.E A DEF'TI~t
I RLtE r{;I.l.tT:--'{,l_ ~"1, Jill] "I_
hi ,h'].; lr:'rt~ V/£I'R"F~ F'~L L,'EF,'] TI',]I ~.q!--"I t'61'h}l.!~ '"'' iL' ;i];lrl [l'hi ""'1,1D 1'~,'O
Il.. 7,,
- - - tTM /'TFt -" ~.IFPT-T~ !;ISI "1 j'l ..... x-h~]il~Tii/::,~-d-L~ J'l i ..... 1~]~1-i-7~L:-S F I, ITFF'ERENC. E
vr:'l~:l' I r NL
L OI'~NECT I ON
0. O0
O. 6?
O. 70
0.70
o. O0
O. O0
0. O0
6:00
0.00
0.0i
O. 7.1
C). 7 I
u. 72
0.7:'
O. / -'.
' 0
O. } ::
O. 72
O. 73
O. 74
O. 75
O. O0
0.01
0.00
O. O0
0.00
O. O0
0.
O. O0
O. O0
O. O1
0.01
O. O0
' ,:'IqT,.~ Pt A'.:.,~'A F'r:T!--,,'CrI_EUP! [C'I"PAr ',
'BF'EF'RY- E:UN WELL L:[LIt<V[ Y ]NG F.OMF'ANY
CI'rFiF'L!I,',TI L]~'I L'A t'r:
, tLINE .1..,
DATE OF =,LRVEY MAY
,JOB NUMBER BO'5'B- 1/_-,0 :-.:'.-?
k'I-iLL. Y I3LI'_:;[~I:NG ELEV. =
OF'ER(I I CIR-Iq ] LAM
PAGE
1 '.~82
7:::. 75 FT.
fit Cf: ;.~,'%. 4 Ii r, ,..4 ~,1. I ',-" .:,L B-.:,EA D[LF'TH
".LE :, FOR £EVITl,,I tOq f EIZT ~]1:- ,'-I ,"'
f'l!'
D.F i']'! F
] -<U[:.. ' ,I tU-'
VFER T I L"AI_ UI:RT r ,: ,'-',t_
-- -'-D<'=7 q7 ............ j:!:]'"YN
fRI-_-C Ti] l',,tl:,Lil_r"lf:( F Oc~!?D l i'h l'l [.".,
NUI,'I H/'- '~
,:,IL U] H LAG, I/WI/5]
M!]..- TVD
IL~ I F F EF~ENC:.E
V£:R F I C AL
C. OR~(ECT 1 ON
0 .. 0 0
0. t) 7
O. 77
1.98
-' O5
4.05
5.36
o. /8
7.64
7.
/.48
7. t7
.Z,, :1.:";
6,.54
/,. -,
5.16
",t-fi, I '[ Fi ~'-IL~C,I',¢'~ F'FT::dld~E1JM, [2 Fd
I'J iF' RJ4L,.')
C CIhil::'t.lT Ii I t C!lq L]£~ FL:
,Jl. li,,il'i I, t 5:;32
DATE OF
-' I ' - 29,
::,L RVEY MAY
,.IOI3 NLIMBE[< .~F'-'-
[ --I'=l :l- 1 t' (~ i!I '?
..LLI_Y BU'_:,~t.[NG ELEV, =
UFEI-~A]UR MILAM
73.75 FT.
:rhiTFlkr, JLA . _ I '
..... ',,~I .... ~!:..., F~3F.' E~.;r{N I0,} Fr:[T 01:' :3UB-SEA EEFTH
I ~,~- q':,; ~I dZL'
..... UFFTI r
] Rl. lr
:,,'F F,' T £ C ,'~L
VERT I CAL
CORRECT I ON
'7 6 7 ~:";
7' 'q-~-r
'rqt' :' 'j
7r:]7 .:-,'. 75 7500 ,. O0
7773, '75 7 s"o C',, 0 L'
71--171-I -~= 'TI:.F'(] ,-', ~
/ .~1
~ - · i e -- · - ,: -
7.3.75 81%3
2,t '.d6 E i36.67
,-'7C',0:' F J4t.62
,0o. Z d 4 .0']. _ N l'J '~>' 75i - ~< ........... ]Ti-&V: --,=,:.,
(~,~ 757 -"~ N '"'"'-' 87 .
..... :, ~ :,.. o. g 15c) 52
.,, ~t'~ 77,}. 15"; 1'.1 '::4'F;. AO E ~ 54.62
,, ':" ~ ,'::: 3.6,6 N ::/4. -"5 F J ~2.L:. 4 4
. '3t' 7':'/,. '1'1 N 3'~C:. ,I. 3 E 1. ~1. ' . J. I
.0'3 :::q'--'~ 0 :: N '~1] "t':O E 165"
:5,t o,.,,-, 46 N 46~ OA E t71 4]
4.73
4.4:3
4. '"1
4.10
'3.04
'-' ':;9
4.43
4.97
5.1.2:
4.95
4./.:,2
4.2,°,
4.10
3.6,7
3.4 8
'3.53
2.29
- ~_i']~JY"Tq - c i NEdR t NTIZIRFu3L. A]l FJN
¢. r F,'~ fi-1 RFIO [UC, OF f URVATLIRE) F'O I NTC,
,(
Sohio Alaska% croleun Company
Our Boss Gyroscopic Survey
Job No. Boss-16039
Well: B-18 (SEC31 TllN R14E)
Prudhoe Bay Field
North Slope, Alaska
Survey Date: May 29, 1982
Operator: Marvin Milam
Scale: 1"= 250'
TRUE NORTH
· oo
Surface Location
(344SNL 1892WFL)
25QI. QO
l_250. O0
9410
HORIZONTAL
PROJECTION
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
~ bp~ratOr,~WelI Name and Number
Reports and Materials to be received by: ~..' ~
Date
Required Date Received Remarks
· .... Ccmpletion Report ... Yes
Well History Yes ~_~,~,
~ ....
Core ~scription , ~.~ ~ ~.~ .......... ~, - ~/~
Registered Su=ey Plat ~/~c~ / --
m, ,
Inclination Sudsy 4~.'~
...Drill Stm Test Returns /t d/;'*~ = .............. ~ ~/ ,, ,
/~Pr~u~ion Test Re. rte ~_
MEMORAt DUM Stat! of Alaska
ALASKA_OIL AND GAS CONSERVATION COMMISSION
TO Chatterton _DATE May 24, 1982
Chai~ '-'
FILE NO 108A/$
THRU:
Commissioner
FROM Bobby Foster%~
Petroleum Inspector
TELEPHONE NO
SUBJECT Witness BOPE Test on
Sohio's B-18
Sec. 31, TllN, R14E, UM
Permit #82-2
Thursday., May 13, 1982 - I traveled this date to Prudhoe
Bay' and witnessed the BOPE test on Sohio's B-18.
As the attached BOPE inspection report shows there ~ere two
failures. These failures ~ere repaired and tested while I
was on location.
In mammary I witnessed the BOPE test on $ohio's B-18.
02-00 lA(Rev.10/79)
O&G ~4
("
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Inspector
'~pera
Well
Date ' '"
Well
Representative ~~
Permit
Location: Sec
Drilling Contractor
Location, General
Well Sign
General Housekeeping
Reserve pit
Rig
nOPE Stack
Annular Preventer /
Pipe Rams c~
Blind Rams /
/
Choke Line Valves
H.C.R. Valve /
Kill Line Valves 4
Check Valve /
Test Pres sure
.:5% ° o
/y~casing Set @~ 46. , ft.
Rig ~~Representative.~g ~-/'/P~-.-5~/
ACCUMULATOR SYSTEM
Test Results: Failures
Full Charge Pres sure ~~O psig
Pressure After Closure /d-t]~.~) pslg
200 psig Above Precharge Attained: - mind.sec
Full Charge Pressure Attained: ~ mit /~sec
N2,=~Q,~o°~ ~.Q ;~O) D~O%,~3~psig
Controls: Master ~~
Remote ~3 Blinds switch cover
Kelly and Floor Safety Valves
Upper Kelly / Test Pressure ~~
Lower Kelly / Test Pressure ~~
Ball Type / Test Pressure ~/ ~
Inside BOP ] Test Pressure ~./ ~
Choke Manifold ~ Test Pressure ~OO
No. valves /7
No. flanges ~ ~
Adjustable Chokes ~
Hydrauically operated choke /
_ _
Test Time ~ hrs.
Repair or Replacement of failed equipment to be made within ---, days and
Inspector/Commission office notified.
Distribution
orig.' - AO&GCC
cc - Operator
cc - Supervisor
I n s
M~o R, H. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 8-612
Anchorage, Alaska 99501
Re~ Prudhoe Bay Unit B-IS
8ohio Alaska Petroleum Company
Pex~ni t No. 8~t*~
Sur, Loc.~ 347*8~, 1895*WEL, flee 31, TIIN, R14E, UPM,
~tt~ole ~e.: 889aNaL, 168S*~, See 30, TI1N, RI4E,
Dear M~. Reiley~
Bnclosed is the approved application for permit to drill the
above re~ferenced wel 1.
Well samples and a mud log are not required, A continuous
direotional sul*vey, is required as per 20 AAC ~lS.0$0(b)($). If
available, a tape containing the digitised log information
shall be outmaitted on all logo fo]~ copying except experimental
'10gs, velocity ~rvey$ and dtpmeter surveys.
'Ma~y rivers in Alaska and their drainage systems have been
c essified as important for the spawning or siltation of
anadl~omous fish. Operations in these areas are subject to AS
16.$0,870 and the resmlations promulgated thereunder (Title S,
Alaska Administrative Code). Prior to commencing operations
you my be contacted by the Habitat Coordinator's office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 48,
~apter ~J, Article ? and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter ?0) and by the
Federal Water Pollution Control Act, as amended, Prtot~ to ~
¢
Mr. R. H, lbiley
Prudhoe Bay Unit B-18
January ?, 19a~
commencing operations you may be contacted by a representative
of the D~partment of Environmental Conservation,
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spudd®d, We would also like to be notified so that $ repre-
sentative of the Coam~iesion my be present to witness testing
of blowout preventer equipment before surface casing shoe is
drtl led.
In the event of suspension or abandomnent, please give this
office adequate advance notification so that we nay have a
wi rheas preoont o
Very truly yours,
Harry W. Kugl ·
Cmmmisaloner of j~ pRDP~a OE TH~
Alash Oil a Gao ~nse~ation ~ission
Eno 1 o sure
ocs Department of Fish & Game, Habitat Section w/o anal.
Department of Environmental Conservation w/o/encl.
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
January 5, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well B-18 (34-30-11-14)
Enclosed are the following documents, in triplicate, for the
above-named well together with our check for $100.00 to cover
the permit filing fee.
1. Application for Permit to Drill,
2. Proposed Drilling Program Outline,
3. Blowout Prevention Equipment Diagram & Diverter Diagrams,
4. Surveyor's plat showing well location,
5. Directional Map.
If you have any questions, please contact either R. H. Reiley at
263-5183 or K. W. Kolthoff at 263-5176.
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
RECEIVED
19g !
Alaska Oil & Gas Cons. Commiss~or~
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 276-5111
MAIL POUCH 6-612
ANCHORAGE, ALASKA 99502
January 5, 1982
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well B-18 (34-30-11-14)
In accordance with Prudhoe Bay Field Rules and Sohio Alaska
Petroleum Company's policy for drilling the first well on a
pad expansion, a 20" hydril and diverter system will be used
when drilling the surface hole on PBU Well B-18 (34-30-11-14).
B-18 will be the first well drilled on this pad in 1982. A
permit has already been submitted for B-lA (22-31-11-14),
requesting that the surface hole be drilled without a diverter.
If shallow gas is not encountered during the surface hole of
B-18, a waiver for installation of a diverter will be requested
for the remaining B-pad expansion wells, including B-lA; other-
wise we will submit a revised drilling permit to include a
diverter on Well B-lA.
Yours very truly,
R. H. Re iley
District Drilling Engineer
RHR: ja
PERMIT TO DRILL
20 AAC 25 005
la Type of work DRILL [] lb Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC []
REDRILL [] DEVELOPMENT OIL [] SINGLE ZONE []
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2 Name of operator
Sohio Alaska Petroleum Company
3 Address
Pouch 6-612, Anchorage,_Alaska 99502
4 Location of well at surface 9 Umt or lease name
347' SNL, 1895' WEL, Sec. 31, TllN, R14E, UPM Prudhoe Bay Unit
At top of proposed producing interval (target) 10 Well number
700' NSL, 1700' WEL, Sec. 30, TllN, R14E, UPM B-18 (34-30-11-14)
At total depth 11 F~eld and pool
889' NSL, 1665' WEL, Sec. 30, TllN, R14E, UPM Prudhoe Bay
5 Elevation m feet (indicate KB, DF etc ) I 6 Lease designation and serial no Prudhoe Oil Pool
Est. KBE = 75' AMSLI ADL 28310
12 Bond information (see ~0 AAC 25 025)
Type Blanket Surety and/or number Safeco Ins. 2975387 Amount $200,000.00
13 D~stance and d~rect~on from nearest town 14 D~stance to nearest property or lease line 15 D~stance to nearest drdlmg or completed.
NW of Deadhorse 10mdes east of ADL 28286 3296feet well B-6 1500feet
i6 Proposed depth (MD & TVD) 17 Number of acres m lease 18 Approximate spud date
9558'MD 9305'TVD feet 2491 April 5, 1982
'"i9 If dev,ated (see 20 AAC 25 050) J20 Ant,c,pated pressures 3330 pslg@ .... Surface
KICK OFF POINT 6000 feet MAXIMUM HOLE ANGLE 24 oI (see 20 AAC 25 035 (c) (2) 4390 ps,g@ RRI10 ft T/,J~(TVD)
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
36" 20x30 Insulat'.ed Conductor 80' Surface ll0'J 110' 8 cu.yds, Concrete
17 1/2 13 3/8 72# L-80 Butt. 2680' Surface 2680'I 2680' 3720 cu.ft. Permafros'
12 1/4 9 5/8 47# L-80 Butt. 8559' Surface 8559'1 8392' 1155 cu.ft. Class G;
~ 130 cu.ft. Permafros~
8 1/2 7 26# 5-80 IJ4S 1499' 8059' I~ 7936' 9558' iI 9305' 365 cu. ft. Class G
22 Describe proposed program W/18% salt
See attached proposed drilling program outline.
RECEIVED
6 lqfl2
Alaska 0il & Gas Cons. Commission
Anchorage
~;3/}l.b~reby ~ertffy that~st of my knowledge
,fr.
SIGNED mlTLEDistrict Drilling EngineeDAmE
The space below for Commission use R. H. Reiley~
CONDITIONS OF APPROVAL
Samples required Mud Icg required D~rect~onal Survey requ,red J APl number
J o_o
Permit number Approval date "
~;q'-"~" 01/07/82 I SEE COVER LETTER FOR OTHER REQUIREMENTS
,,.
·
_T~r.,..~. 7, 1982
' /' - / by order of the Commission
~S
II
C
Form 10-401 Submit in trlphcate
Rev 7-1-80
(
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL B-18 (34-30-11-14)
Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated
conductor to surface using 8 cu.yds, concrete.
Install diverter and drill 17 1/2" hole to 2700' and cement 13 3/8" 72#
L-80 Buttress casing to surface using 3720 cu.ft. Permafrost II cement.
Blowout prevention equipment consists of 5000 psi W.P. pipe rams, blind
rams, and annular preventer from 13 3/8" casing point to T.D. Maximum
possible bottomhole pressure is 4390 psi at 8800' TVDss based on original
reservoir pressure. Maximum possible surface pressure is 3330 psi based on
a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss.
Directionally drill 12 1/4" hole to 8392' TVD. Run 9 5/8" 47# L-80 But-
tress casing to 8392' TVD and cement first stage with 1155 cu.ft. Class G
cement. Cement second stage through D.V. packer collar at 2600' with
130 cu.ft. Permafrost C cement. 9 5/8" casing will be hung at surface;
the 9 5/8" x 13 3/8" annulus will be Arctic Packed.
Drill 8 1/2" hole to T.D. at 9305' TVD. Cement 7" liner to 500' inside
9 5/8" casing shoe with 365 cu.ft. Class G cement with 18% salt.
Run 5 1/2" 17# L-80 IJ4S IPC tubing with 12 gas lift mandrels and a
production packer assembly at 7890' TVD. A subsurface safety valve with
dual control lines will be placed at 2120'. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of
proposed perforations to be submitted on Sundry Notice to follow.
JAN- 6
~Jaska 0il & Sas Cons,
Anchorage
.B,.O.B STACK C:.ONFI,GUF~.T, ION
1:5 5/8" TRIPLE RAM STACK
5000 PSI WP
DRILLING
.iI
ANNULAR
PREVENTER
PIPE RAMS
BLIND RAMS
CHECK
KILL
GATE
LINE
GATE
DRILLING
SPOOL
4" CHOKE LINE
GATE HYDR. ASST.
GATE
PIPE RAMS
RECEIVED
JAN- 6 1982
Alaska Oil & Gas Cons. Commissio~
Anchorage
FLOWLINE
[-
DRILLING
RISER
;ROUND LEVEL
-- I IH II !
10-3/4" EYDRAHAIC
12"
20" 2000 PSI WP
ANNULAR PREVENTOR
DRILLING
SPOOL
20"
CONDUCTOR
PIPE
DIVERTER SYSTEM DETAIL
DRILL. DEPT.
MARCH 1980
lit i _'1
NOTE: DIVERTER LINE HAS
TWO DIRECTION DISCHARGE
CAPABILITY AFTER LEAVING
RIG SUB-BASES.
SgR~ACE HOLE Di~,'E]~i~_R SYST-~d
Two lines venting 90° apart
-- 10 3/4" manual butterfly valves
1. All pipe connections 150~
ANSI Flanges or welded
connections.
Manual 10 3/4" butterfly valves,
safety wired i]~ open pisit]on at
diverter line tee.
~ 10 3/4" 55,~ Buttress
10 3/4" Hydraulic operated
Butt~er fly valve
' ·
20" Diverter Spool w/10 3/4"
Side Out/et.
JAN- 6 ],982
~aska Oil & Gas Cons. Commission.
Anchorage
! =0 i 40n;c~lOi~ 20 , =0 ,. 40 I '0 :' =° i ~° i 4°
I
,
'; B-~9 ~ .... ~ CP~opose~ [
7 ~PrOposed) ~ , 1700' ! ~
T :' ....]- - ,
~ , ~:~ ' I LAT, · 70° 1~'14.05":
.... ~ ........ ~ ....... ~ ~ ..... t LO~I~= ~0' S2.~~ -
SCALE I "= I/2 MILE
~RTIFICATE OF SURVEYOR
FLARE
PIT
T. IIN.
T. ION.
SUMP
i.$o- 11-14)
- $o. I/-
PAD, DETAIL
SCALE t"= 300'
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska and that this plat
represents a location survey of the wellpad shown and the wells
thereon. This survey was made by mede under my supervision
and all dimensions and other details are correct. Bottom hole
locations are furnished by others.
bec.
Date
Sheet 3 of 3
REVISE B-18 8 B- 19 BHL
RECEIVED
JAN- 6 ]9~,2
Naska Oil E Gas Cons. Commi:
Anchorage
(~L~I /S/82
PAD "B" EXTENSION
Located in
rveyed for
SOHIO ALASKA PETROLEUM CO.
Surveye,
~Jon F.M. LINDSEY I~ ASSOC.
LAND & HYDROGRAPHIC SURVEYO'RS
2502West Northern Lights Boulevard Box 4-081
Anchorage
B-18 INTERSECTION~
SCALE: 1 "= 100
: 4358' TVD BKB
B-~18: 7071' TVD BKB
~OP ~700"
goP 28oo'
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No. 1, ~, ~.
ITEM APPROVE DATE
(1) Fee ~/__ /-~l,
(2)
/2 thru 8)
(3) Admin ~,-~
~g thru 11)
(4) _Casg
(12 thru 20)
(5) BOPE
(21 thru 24)
(6) Add:
9~
10.
11.
YES NO
1. Is the permit fee attached .........................................
2. Is well to be located in a defined pool .............................
3. Is well located proper distance from property line .................
4. Is well located proper distance from other wells ...................
5. Is sufficient undedicated acreage available in this pool ............
6. Is well to be deviated and is well bore plat included ...............
7. Is operator the only affected party .................................
8. Can permit be approved before ten-day wait ..........................
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
12. Is conductor string provided ........................................
13. Is enough cement used to circulate on conductor and surface .......
14. Will cement tie in surface and intermediate or production strings
15. Will cement cover all known productive horizons ..................
16. Will surface casing protect fresh water zones .................
17. Will all casing give adequate safety in collapse, tension and b~rst.
18. Is this well to be kicked off from an existing wellbore ..... // ......
19. Is old wellbore abandonment procedure included on 10-403 ..;~ .......
20. Is adequate well bore separation proposed ............. ../ .........
/
21. Is a diverter system required ........................ / .............
22. Are necessary diagrams of diverter and BOP equipment/~ttached ......
23. Does BOPE have sufficient pressure rating - Test to/ .......... psig .
24. Does the choke manifold comply w/API RP-53 (Feb.7~.777]]777i'. ......
25. Additional requirements ...................... /~ .....................
Additional Remarks:
REMARKS
Geology: ~q~ineering:
HWK LCS BEW
WVA JKT RAD
JAL~~_
rev: 03/10/81
INITIAL [ GEO. UNIT ON/OFF
POOL CLASS STATUSI AREA NO. SHORE
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No.
ITEM APPROVE DATE
(1) Fee //~~F'~ ?~_~ wgl..
(2) Loc ~2~
thru 8)
2. Is well to be located in a defined pool ..............
3. Is well located proper distance from property
4. Is well located proper distance from other wells . i ' °'.''.
5. Is suff±cient undedicated acreage available in this pool
6. Is well to be deviated and is well bore plat included ...............
7. Is operator the only affected party
8.
(3) Admin ~/~ ~-'~% 9.
ythru 11) 10.
11.
(4) Casg ~ .I/~/~Z
(12 thru 20)
(5) BOPE ~ //~/M2-
(21 thrd 24)
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
1. Is the permit fee attached ........................................
(6) Add:
YES NO
Can permit be approved before ten-day wait ..........................
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is conductor string provided ........................................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ..
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones .......................
Will all casing give adequate safety in collapse, tension and burst.
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate well bore separation proposed ...........................
Is a diverter system required .......................................
Are necessary diagrams of diverter and BOP equipment attached . ..
Does BOPE have sufficient pressure rating - Test to 3-~)O ~si'~ .~
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
Additional requirements .............................................
REMARKS
Additional Remarks:
Geolog. ~.' Engin~_$~e~_e in~.- ~ ,
WVA ~_ JKT ~ RAD-----
JAL .~~
rev: 03/10/81
INITIAL l GEO. UNIT ION/OFF
POOL CLASS STATUS AREA NO. SHORE
Well History. File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify 'finding information, information of this
nature is accumulated at the end of the file under APPEN. DIXi
No special'effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
RECEIVED
* *
.............................. JUL 1 ~ 1998
~ ............................ .
* ....... SCHLUMBERGER ....... t
............................ _~ask~ Oi~ & (~as Cons. Commission
.............................. ~omge
COMPANY NAME : BP EXPLORATION
WELL NAME : B-18
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292070200
REFERENCE NO : 98333
% 8-JUL-1998 11:09 PAGE: 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/07/ 8
ORIGIN : FLIC
REEL NAME : 98333
CONTINUATION # :
PREVIOUS REEL :
COMF~EN~f : BP EXPLORATION, B-18, PRUDHOE BAY, API# 50-029-20702-00
**** TAPE HEADER ****
SERVICE NAME '. EDIT
DATE : 98/07/ 8
ORIGIN : FLIC
TAPE NAME : 98333
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, B-18, PRUDHOE BAY, API# 50-029-20702-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: B- 18
API NUMBER: 500292070200
OPERATOR: BP EXPLORATION
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 8-JUL-98
JOB NUMBER: 98333
LOGGING ENGINEER: S.DECKERT
OPERATOR WITNESS: A. COLEFiAN
SURFACE LOCATION
SECTI ON: 31
TOWNSHIP: 1 IN
RANGE: 14E
FNL: 344
FSL:
FEL: 1892
FWL :
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 73.75
DERRICK FLOOR: 72.75
GROUND LEVEL: 45.30
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 8.500 7. 000 9405.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
% 8-JUL-1998 11.09 PAGE: 2
LIS Tape Verification Llstlng
Schlumberger Alaska Computing Center
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
..............
88888.0
9180.0
9168.5
9150.5
9119.5
9118.5
9089.0
9088.0
9080.5
9076.5
8960.5
8958.0
8955.0
8945 5
8934 5
8920 0
8915 5
8908 5
8898 5
8896.5
8893 5
8892 5
8878 5
8853 5
8845 0
8839 5
8829 0
8819.0
8806.5
8805.5
8794.0
8785.0
8778.5
8777.5
8767.0
8753.5
8746.0
8738.5
8718.5
8707.0
8696.5
8689.0
8686 0
8679 5
8664.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GR CH TDTP
..............
88887.5 88887.5
9179.5 9179.5
9168.0
9150.0 9150.0
9119.0
9088.5
9119.0
9088.5
9081.0 9081.0
9077.0 9077.0
8962.0 8962.0
8959.5 8959.5
8956.0 8956.0
8946.0 8946.0
8935.5 8935.5
8921.0 8921.0
8917.0 8917.0
8910.0 8910.0
8900.0 8900.0
8898.0 8898.0
8895.0
8895.0
8880.5 8880.5
8855.5 8855.5
8847.0 8847.0
8841.5 8841.5
8831.5 8831.5
8821.0 8821.0
8808.0
8795.5
8787.0
8780.5
8769.5
8756.0
8749.5
8741.0
8720.0
8709.0
8698.5
8691.0
8687.0
8681.5
8666.0
8808.0
8795.5
8787.0
8780.5
8769.5
8756.0
8749.5
8741.0
8720.0
8709.0
8698.5
8691.0
8687.0
8681.5
8666.0
% 8-JUL-1998 11:09 PAGE: 3
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
8659.5 8661.5
8659.0 8661.5
8653.0 8655.0 8655.0
8634.0 8635.5 8635.5
8630.5 8632.5 8632.5
8618.5 8620.0 8620.0
8613.0 8616.0 8616.0
8600.5 8602.5 8602.5
100.0 102.0 102.0
$
REMARKS:
CONTAINED HEREIN IS THE TDTP DATA ACQUIRED ON
BP EXPLORATION WELL B-18 ON 22-FEB-98. THE DEPTH SHIFTS
SHOWN ABOVE REFLECT TDTP PASS #1 GRCH TO THE BASELINE
GAM~A RAY PROVIDED BY THE CLIENT; AND TDTP PASS #1 SIGM
TO THE BASELINE GAF~IA RAY. ALL OTHER TDTP CURVES WERE
CARRIED WITH THE SIGM SHIFT.
$
$
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and cl~pped curves for each pass in separate files.
PASSNUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUiVlF~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 9205.0 8595.0
TDTP 9230.0 8595.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE'
PASS NUMBER:
BASELINE DEPTH
..............
$
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH TDTP
..............
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~OL6~ $~D ~£~£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~ $~D ~£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~OL6~ S~D ~£0£ OND£
0000000000 89 ~ r r r 0 O0 000 O0 rOL6£rr S~D ~£0£ ~O£
0000000000 89 ~ r r r 0 O0 000 O0 rOL6Srr SWD
0000000000 89 ~ r r r 0 oo 000 oo roL6srr s~o d£~£
0000000000 89 ~ r r r 0 O0 000 O0 rOL6£r[ SdD d£0£
0000000000 89 ~ r r r 0 O0 000 O0 roz6£rr OD ~£0£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~ 8£0£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~OL6~rr OD ~£0£ H~I£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~ OD ~£0£ DDI£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 [OL6~rr OD 8£O£NIq~S
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 rOL6~r[ OD ~£0£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 [OL6Srr S-OW ~£0£ IH~£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~ OD ~£0£ ~I£
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~ £~
(X~H) ~OOD W~q~ WI4~S ~I41'IN OOW SS~"ID ~X£ DOq # ~O~IO OI
SS~DO~8 ~ ~ZIS gWON ~I40N ~I~ I~ IS~ IW~ I~ ~DIA~S ~INO A~S ~Ia~N
.......................................................................................
0 99 0
~ 99 9~
89 99
0 99
89
~ 99
.r.~q ~9 6
£ '0 89 8
£9
£I. 9
99
I 99
88 6£
0 99
0 99
i~tl'YIVA ~JOOD Hd~H ~dA,L
~ CHOD~ NOI£VDIWIDSWS £VI4~0~ V£VO ~
V£VG £V~HOX
'V£VG SIH~ 0£
C~I~WWV ~H~L~ S~IHS ESVd 0£ SSVd ON 'r# SSVW W£C~ HO~
V£VC C~£D~qIOD I{Ld~G GA~V ~ddI~D SH~ SNIVJ~NOD ~qI~ SII-I~
~ :~DVd 60:rr 866r-~flp-8 ~
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
.......................................................................................
TSCF TDTP CPS 1159701
INND TDTP CPS 1159701
INFD TDTP CPS 1159701
GRCH TDTP GAPI 1159701
TENS TDTP LB 1159701
CCL TDTP V 1159701
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 9229
SBHN. TDTP 71
SDSI. TDTP 0
TCAF. TDTP 11797
TSCF. TDTP 2627
TENS. TDTP 1373
DEPT. 8597
SBHN. TDTP 52
SDSI. TDTP 1
TCAF. TDTP 5295
TSCF. TDTP 350
TENS. TDTP 1271
500 SIGM. TDTP 13. 298 TPHI. TDTP 29. 632 SBHF. TDTP
405 SIGC. TDTP O. 339 SIBH. TDTP 104. 013 TRAT. TDTP
310 BACK. TDTP 142.123 FBAC. TDTP 40. 538 TCAN. TDTP
336 TCND. TDTP 19973. 621 TCFD. TDTP 6609. 628 TSCN. TDTP
555 INND. TDTP 2100. 846 INFD. TDTP 321.223 GRCH. TDTP
000 CCL. TDTP 0. 000
· 000 SIGM. TDTP 44. 770 TPHI. TDTP 62. 809 SBHF. TDTP
· 028 SIGC. TDTP 0.162 SIBH. TDTP 64.217 TRAT. TDTP
· 356 BACK TDTP 145.776 FBAC. TDTP 30. 674 TCAN. TDTP
· 913 TCND. TDTP 14413. 396 TCFD. TDTP 3459. 853 TSCN. TDTP
· 727 INND. TDTP 1650. 815 INFD. TDTP 307.289 GRCH. TDTP
· 000 CCL. TDTP O. 000
58. 613
1. 803
27177. 762
6053· 150
- 999· 250
47. 029
1. 752
21194. 004
1277· 794
51.3 61
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE ' FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
8-JUL-1998 11:09 PAGE: 6
%
LIS Tape Verification Llstlng
Schlumberger Alaska Computing Center
FILE HEADER
FILE AU3M~ER: 2
EDITED CURVES
Depth shifted and cl~pped curves for each pass in separate flies.
PASS NUMBER: 2
DEPTH INCREF~ENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 9205.0 8595.0
TDTP 9230.0 8595.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: i
BASELINE DEPTH
..............
88888.0
9213.5
9179.5
9178.5
9168.0
9151.5
9150.0
9139.0
9136.0
9133.5
9119.0
9118.5
9109.0
9088.5
9076.5
9073.5
9054.5
9035.5
9017.5
9014.0
9013.0
8989.5
8980.0
8963.5
8960.5
8960.0
8954.5
8944.5
8936.5
8934.5
8932.0
8920.0
8919.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH TDTP
..............
88888.5 88888.5
9214.0
9180.0
9179.0
9168.0
9152.0
9150.0
9139.0
9136.5
9134.0
9119.5
9119.5
9110.0
9089.0 9089.0
9077.0
9074.5
9055.5
9035.5
9017.0
9015.0
9013 0
8991.0
8981.5
8965.5 8965.5
8962.0
8961.5
8956.0
8946.5
8938.0 8938.0
8936.0
8933.5 8933.0
8921.5
8921.0
8-JUL-1998 11:09 PAGE: 7
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
8915.0 8917.5
8908.5 8910.5
8908.0 8910.0
8899.0 8900.5
8896.0 8898.5
8894.0 8895.5
8892.5 8895.0
8879.5 8881.0
8875.0 8878.0
8852.5 8855.0 8854.5
8850.0 8853.5
8845.0 8847.0
8844.0 8846.5
8840.0 8842.0
8839.0 8841.5
8830.5 8832.5
8829.5 8832.0
8819.0 8821.5
8818.5 8821.0
8806.5 8808.5
8806.0 8809.0
8794.0 8796.5
8785.0 8787.5
8784.5 8787.5
8778.0 8780.5
8766.5 8769.5 8769.5
8753.0 8756.0
8745.5 8749.5
8738.5 8741.0
8737.0 8740.0
8736.0 8739.0
8728.0 8730.5
8723.0 8723.5
8718.5 8722.5
8715.0 8717.0
8711.0 8713.5
8706.5 8709.0
8704.0 8706.0
8696.5 8698.5
8691.5 8694.5
8686.0 8687.5
8685.0 8685.5
8679.5 868O 0
8664.0 8666.0
8660.0 8662.5
8658.5 8661.5
8633.5 8635.5
8631.0 8634.0
8630.0 8632.5
8619.5 8622.0
8617.0 8617.5
100.0 102.5 100.5
$
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
8-JUL-1998 11:09 PAGE: 8
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
FOR TDTP PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT
TDTP PASS #2 GRCH TO TDTP PASS #1 GRCH; AND TDTP PASS
#2 SIGM TO TDTP PASS #1 SIGM. ALL OTHER TDTP CURVES
WERE CARRIED WITH THE SIGM SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SIGMTDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI TDTP PU-S 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SBHF TDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SBHN TDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SIGC TDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SIBH TDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT TDTP 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
SDSI TDTP CU 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
BACK TDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
FBAC TDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TCANTDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TCAF TDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TCND TDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
TCFD TDTP CPS 1159701 O0 000 O0 0 2 1 1 4 68 0000000000
8-JUL-1998 11.09 PAGE: 9
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
TSCN TDTP CPS 1159701
TSCF TDTP CPS 1159701
INND TDTP CPS 1159701
INFD TDTP CPS 1159701
GRCH TDTP GAPI 1159701
TENS TDTP LB 1159701
CCL TDTP V 1159701
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9230.500 SIGM. TDTP 13.014 TPHI.TDTP 27.355 SBHF. TDTP
SBHN. TDTP 65.970 SIGC. TDTP O. 745 SIBH. TDTP 89. 896 TRAT. TDTP
SDSI. TDTP 1 . 135 BACK. TDTP 122. 672 FBAC. TDTP 29. 030 TCAN. TDTP
TCAF. TDTP 2618.514 TCND. TDTP 3993. 955 TCFD. TDTP 1378. 649 TSCN. TDTP
TSCF. TDTP 585.918 INND. TDTP 341.146 INFD. TDTP 74 . 832 GRCH. TDTP
TENS. TDTP 1354. 000 CCL. TDTP O. 014
DEPT. 8595. 500 SIGM. TDTP 42. 482 TPHI. TDTP 61. 704 SBHF. TDTP
SBHN. TDTP 54.309 SIGC. TDTP 2.379 SIBH. TDTP 69.390 TRAT. TDTP
SDSI. TDTP 3. 156 BACK. TDTP 86. 999 FBAC. TDTP 20. 226 TCAN. TDTP
TCAF. TDTP 1320.610 TCND TDTP 3234.134 TCFD. TDTP 771.285 TSCN. TDTP
TSCF. TDTP 78. 881 INND. TDTP 314. 686 INFD. TDTP 57. 850 GRCH. TDTP
TENS. TDTP 1255. 000 CCL. TDTP 0. 000
61 945
1.752
5856.940
1310.547
-999.250
44.271
1 713
5273 311
301. 341
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
10
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass ~n separate f~les.
PASS NUMBER: 3
DEPTH INCREFIENT: 0 5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 9205 0 8575.0
TDTP 9230.0 8575.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
..............
88888.0
9212.0
9199.0
9179.5
9179.0
9152.0
9150.0
9147.0
9139.0
9119.0
9118.5
9106.0
9088.5
9087.5
9082.5
9076 5
9076.0
9073.5
8990.5
8990.0
8971.0
8968.5
8964.0
8963.5
8960.0
8958.0
8957.5
8955.0
8954 5
8937.0
8933.5
8932.0
8931.0
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH TDTP
..............
88888.0 88888.0
9212.0
9199.0
9180.0
9179.0
9151.5
9150.0
9147.0
9139.0
9119.0
9119.5
9107.0
9088.5
9088.5
9083.0
9077.5
9077.0
9074.0
8991.5
8991.0
8973.0
8970.5
8965.5
8965.0
8962.0
8960.0
8959.0
8956.0
8955.5
8938.0 8938.0
8935.5
8933.0
8932.5
LIS Tape Verl£~catlon Llst~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
11
8920.0 8921.0 8921.5
8908.5 8910.0
8899.0 8900.5
8898 5 8900.0
8893.0 8895.5 8895.0
8876.5 8878.5
8873.0 8875.0
8852.5 8855.0
8852.0 8854.5
8845.0 8847.5
8844.0 8846.5
8840.0 8841.5
8837.5 8839.0
8829.5 8832.5
8829.0 8832.0
8826.0 8828.5
8819.0 8821.0
8818.5 8821.0
8806.5 8808.0
8805.5 8808.5
8785.0 8787.5
8784.5 8786.5
8782.5 8784.5
8767.0 8770.0 8769.5
8753.5 8756.0
8750.5 8753.5
8747.5 8750.5
8745.5 8749.5
8738.5 8741.0
8734.5 8737.5
8734.0 8737.5
8728.0 8730.5
8717.5 8719.5
8706.5 8709.0
8696.5 8698.5
8691.5 8694.5
8685.5 8687.5
8679.5 8681.5
8678.5 8680.5
8664.0 8666.0
8659.5 8661.5
8658.5 8661.5
8649.5 8651.5
8644.0 8644.5
8633.5 8635.5
8631.0 8633.5
8630.5 8632.5
8623.0 8624.0
8617 . 0 8619.5
8615.5 8617.5
8599.5 8602 5
100.0 103.0 102.0
$
REMARKS: THIS FILE CONTAINS THE CLIPPED AND DEPTH CORRECTED DATA
LIS Tape Verification Llstlng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
12
FOR TDTP PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT
TDTP PASS #3 GRCH TO TDTP PASS #1 GRCH; AND TDTP PASS
#3 SIGM TO TDTP PASS #1 SIGM. ALL OTHER TDTP CURVES
WERE CARRIED WITH THE SIGM SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELi~,~ CODE (HEX)
DEPT FT 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SIGM TDTP CU 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TPHI TDTP PU-S 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SBHF TDTP CU 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SBHNTDTP CU 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SIGC TDTP CU 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SIBH TDTP CU 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TRAT TDTP 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
SDSI TDTP CU 1159701 O0 000 O0 0 3 I 1 4 68 0000000000
BACK TDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
FBAC TDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TCANTDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TCAF TDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TCND TDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
TCFD TDTP CPS 1159701 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verlflcatlon L~st~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE: 13
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
TSCN TDTP CPS 1159701
TSCF TDTP CPS 1159701
INND TDTP CPS 1159701
INFD TDTP CPS 1159701
GRCH TDTP GAPI 1159701
TENS TDTP LB 1159701
CCL TDTP V 1159701
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 9230. 000 SIGM. TDTP 15.114 TPHI. TDTP 25. 354 SBHF. TDTP
SBHN. TDTP 64. 464 SIGC. TDTP O. 372 SIBH. TDTP 88.169 TRAT. TDTP
SDSI. TDTP 1. 953 BACK. TDTP 85. 000 FBAC. TDTP 20. 696 TCAN. TDTP
TCAF. TDTP 1523. 490 TCND. TDTP 2406. 870 TCFD. TDTP 839. 569 TSCN. TDTP
TSCF. TDTP 340.216 INND. TDTP 216.253 INFD. TDTP 45.371 GRCH. TDTP
TENS TDTP 1342. 000 CCL. TDTP O . 000
DEPT. 8577. 000 SIGM. TDTP 45. 929 TPHI. TDTP 76.076 SBHF. TDTP
SBHN. TDTP 57. 820 SIGC. TDTP 0 . 000 SIBH. TDTP 77. 357 TRAT. TDTP
SDSI. TDTP 3. 077 BACK. TDTP 72.181 FBAC. TDTP 17. 527 TCAN. TDTP
TCAF. TDTP 1292. 828 TCND. TDTP 3941 . 749 TCFD. TDTP 850. 986 TSCN. TDTP
TSCF. TDTP 75 954 INND. TDTP 400.816 INFD. TDTP 71 . 658 GRCH. TDTP
TENS. TDTP 1251. 000 CCL. TDTP O . 000
53. 935
1.617
3220.254
719. 127
-999.250
55 117
1 896
5762.291
314.832
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE · 1024
FILE TYPE : LO
LAST FILE :
· 8-JUL-1998 11:09 PAGE: 14
LIS Tape Verification Lxstlng
Schlumberger Alaska Computing Center
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average
of edlted static baseline passes for all other curves.
DEPTH INCRE~iENT 0.5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
1, 2, 3,
TDTP
REMARKS:
THE ARITH~ETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
SIGM PNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TPHI PNAV PU-S 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
SBHF PNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
SBHNPNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
15
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
SIGC PNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
SIBH PNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TRAT PNAV 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
SDSI PNAV CU 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
BACK TDTP CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
FBAC TDTP CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TCANPNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TCAFPNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TCND PNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TCFD PNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TSCN PNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
TSCF PNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
INNDPNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
INFD PNAV CPS 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH TDTP GAPI 1159701 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 9229.500 SIGM. PNAV 13.572 TPHI.PNAV 27.379 SBHF. PNAV 57.817
SBHN. PNAV 67.650 SIGC. PNAV 0.524 SIBH. PNAV 95.223 TRAT PNAV 1.727
SDSI.PNAV 1.035 BACK. TDTP 142.123 FBAC. TDTP 40.538 TCAN. PNAV 12139 125
TCAF. PNAV 5332.497 TCND.PNAV 8814.443 TCFD.PNAV 2948.617 TSCN. PNAV 2706.278
TSCF. PNAV 1188. 830 INND PNAV 882. 598 INFD. PNAV 145. 156 GRCH. TDTP -999. 250
DEPT. 8597.000 SIGM. PNAV 44.195 TPHI. PNAV 52.353 SBHF PNAV 44.512
SBHN. PNAV 46.903 SIGC.PNAV 0.343 SIBH. PNAV 52.595 TRAT. PNAV 1. 735
SDSI.PNAV 2.874 BACK. TDTP 145.776 FBAC. TDTP 30.674 TCAN. PNAV 11146.568
TCAF. PNAV 2801.067 TCND.PNAV 7453.593 TCFD.PNAV 1781.578 TSCN PNAV 682.336
TSCF. PNAV 184. 559 INND. PNAV 781. 098 INFD. PNAV 146. 271 GRCH TDTP 51 361
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Llst~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
16
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate f~les; raw background pass in last flle
PASS NUMBER: 1
DEPTH INCREMENT: 0. 5000
FILE SUM~i~Y
VENDOR TOOL CODE START DEPTH
TDTP 9258.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAI~IA RAY
TDTP THERMAL DECAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
STOP DEPTH
8579 5
22-FEB-98
8C0-609
1839 22-FEB-98
9242.0
9241.0
8600.0
9229.0
1800 0
NO
TOOL NUMBER
...........
CGRS-A
TDT-P
8.500
9405.0
SEA WATER
LIS Tape Verification Llstlng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE: 17
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO DRESSER BHCS DATED 5-21-82.
PUMPED TOTAL OF 315 BBLS.
THIS FILE CONTAINS THERAW TDTP DATA FOR PASS #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
18
** SET TYPE - CHAN **
NAlWiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELTO4 CODE (HEX)
O0 000 O0 0 5 1 1 4 68 0000000000
DEPT FT 1159701
SIGM PS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TPHI PS1 PU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
SBHF PS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
SBHNPS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
SIGC PS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
SIBH PS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TRAT PS1 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
SDSI PS1 CU 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
BACK PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
FBAC PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TCANPS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TCAF PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TCNDPS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TCFD PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TSCN PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TSCF PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
INND PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
INFD PS1 CPS 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS1 LB 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
CCL PS1 V 1159701 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 9258.000 SIGM. PS1 -999.250 TPHI.PS1 -999.250 SBHF. PS1
SBHN. PS1 -999.250 SIGC PS1 -999.250 SIBH. PS1 -999.250 TRAT. PS1
SDSI.PS1 -999.250 BACK. PSI -999 250 FBAC.PS1 -999.250 TCAN. PS1
TCAF. PS1 -999.250 TCND.PS1 -999.250 TCFDPS1 -999 250 TSCN. PS1
TSCF. PS1 -999.250 INND.PS1 -999.250 INFD.PS1 -999.250 TENS.PSI
GR.PS1 135.606 CCL.PS1 -0.029
DEPT. 8579.500 SIGM. PS1 44.371 TPHI PS1 67.233 SBHF. PS1
SBHNPS1 52.697 SIGC. PS1 0.920 SIBH. PS1 65.735 TRAT. PS1
SDSI.PS1 1.670 BACK. PSi 141 057 FBAC.PS1 33.727 TCAN. PS1
TCAF. PS1 5169.242 TCND. PS1 13879.533 TCFD PS1 3224.997 TSCN. PS1
TSCF. PS1 316.885 INND. PS1 1625.508 INFD.PS1 279.248 TENS.PSi
GR.PS1 50.053 CCL.PS1 -999 250
-999.250
-999 250
-999 250
-999.250
1028.000
46.640
1.825
20786 914
1241.090
1276.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
19
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass in separate flies; raw background pass in last flle
PASS NUMBER: 2
DEPTH INCREMENT. 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
9261.0 8583 0
TDTP
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAMMA RAY
TDTP THERMAL DECAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
22-FEB-98
8C0-609
1839 22-FEB-98
9242.0
9241.0
8600.0
9229.0
1800.0
NO
TOOL NUMBER
...........
CGRS-A
TDT- P
8.500
LIS Tape Verification L~st~ng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
2O
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
9405.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G) ..
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO DRESSER BHCS DATED 5-21-82.
PUMPED TOTAL OF 315 BBLS.
THIS FILE CONTAINS THE RAW TDTP DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PA GE: 21
TYPE REPR CODE VALUE
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
DEPT FT 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SIGM PS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TPHI PS2 PU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SBHF PS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SBHNPS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SIGC PS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SIBH PS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TRAT PS2 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
SDSI PS2 CU 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
BACK PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
FBAC PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TCANPS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TCAF PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TCNDPS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TCFD PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TSCN PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TSCF PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
INNDPS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
INFD PS2 CPS 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS2 GAPI 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS2 V 1159701 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 9261.000 SIGM. PS2 -999.250 TPHI.PS2 -999.250 SBHF. PS2
SBHN. PS2 -999.250 SIGC. PS2 -999.250 SIBH. PS2 -999 250 TRAT. PS2
SDSI.PS2 -999.250 BACK. PS2 -999.250 FBAC. PS2 -999.250 TCANPS2
TCAF PS2 -999.250 TCND. PS2 -999.250 TCFD. PS2 -999.250 TSCN. PS2
TSCF. PS2 -999.250 INND.PS2 -999.250 INFD.PS2 -999.250 TENS.PS2
GR.PS2 54.242 CCL.PS2 -0.010
-999.250
-999.250
-999.250
-999.250
886.000
LIS Tape Verification Llstlng
Schlumberger Alaska Computlng Center
8-JUL-1998 11:09
PAGE:
22
DEPT. 8583.000 SIGM. PS2
SBHN. PS2 53.568 SIGC.PS2
SDSI.PS2 4.304 BACK. PS2
TCAF. PS2 1348.851 TCND.PS2
TSCF PS2 85.093 INND.PS2
GR.PS2 54.969 CCL.PS2
41.891 TPHI.PS2
1.983 SIBH. PS2
88.411 FBAC. PS2
3191.308 TCFD.PS2
317.200 INFD.PS2
-999.250
61.793 SBHF. PS2
67.709 TRAT. PS2
19.757 TCAN. PS2
786.533 TSCN. PS2
56.947 TENS.PS2
49.235
1.736
5245.747
315.154
1242.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW CURVES
Curves and log header data for each pass ~n separate f~les; raw background pass in last f~le
PASS NUMBER: 3
DEPTH INCREMENT: O . 5000
FILE SUFmlARY
VENDOR TOOL CODE START DEPTH
...........................
TDTP 92 61.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
STOP DEPTH
..........
8558.0
22-FEB-98
8C0-609
1839 22-FEB-98
9242.0
9241 0
8600.0
9229 0
LIS Tape Verlfacatlon Llstlng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE.
23
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
1800.0
NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAMMA RAY
TDTP THERMAL DECAY
$
TOOL NUMBER
CGRS-A
TDT- P
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
8.500
9405.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS) · 12000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 30000
TOOL STANDOFF (IN):
R~fARKS: CORRELATED TO DRESSER BHCS DATED 5-21-82.
PUMPED TOTAL OF 315 BBLS.
THIS FILE CONTAINS THE RAW TDTP DATA FOR PASS #3.
$
LIS FORMAT DATA
0000000000 £9 ~ ~ ~ L 0 O0 000 O0 ~0£6~ A ESd ~OO
0000000000 ~9 ~ ~ T L 0 O0 000 O0 TOL6£~T
0000000000 89 ~ T ~ £ 0 O0 000 O0 ~OL6~
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6£~ S~D ES~ ~I
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0~6~ $~D E$~ ~I
0000000000 89 ~ ~ ~ ~ 0 O0 000 O0 ~0£6~
0000000000 89 ~ r ~ L 0 O0 000 O0 rOL6S~
0000000000 89 ~ ~ ~ L 0 00 000 00 ~OL6g~ SdD
0000000000 89 ~ ~ ~ L 0 00 000 00 ~OL6g~ SdD ESdG_ND~
0000000000 89 ~ ~ ~ L 0 00 000 00 rOL6g~ SdD gSd
0000000000 89 ~ ~ ~ L 0 00 000 00 ~OL6g~I SdD ESdNVD£
0000000000 89 ~ ~ ~ L 0 O0 000 O0 IOL6g~ SdD
0000000000 89 ~ ~ ~ L 0 O0 000 O0 ~OL6g~r SdD
0000000000 89 ~ ~ ~ L 0 O0 000 O0 ~OL6g~ ~D ESd ISC$
0000000000 89 ~ ~ ~ L 0 O0 000 O0 ~OL6g~
0000000000 89 ~ ~ ~ L 0 O0 000 O0 ~OL6g~ ~D gSd HHIS
0000000000 89 ~ r r L 0 O0 000 O0 roL6grr ~D ged DDIS
0000000000 89 ~ r r L 0 O0 000 O0 roL6grr ~O ~£d NHgS
0000000000 89 ~ r r L 0 O0 000 O0 roL6~rr ~O gSW ~HgS
0000000000 89 ~ r r L 0 O0 000 O0 roL6~rr Od ~£~ IHd£
0000000000 89 ~ r r L o OO 000 OO roz65rr OD t£~ ~DIS
0000000000 89 ~ r r L 0 oo 000 O0 roL6grr
(X~H) SCOD ~g~H dI4VS ~WON COW SSV~ID HdA.r. DOq # HSCHO CI
SS~DOHW ~rd~H ~ZIS SWIIN gW[1N ~I~t IWV IWV IdV IWV ~DIAH~S .r. INO AHSS ~I4VN
.......................................................................................
r 99 0
r 99 9r
89 99
0 99
89
rr 99 rr
£~ g9 6
£'0 89 8
£9 L
fL 9
99
r 99
0 99
0 99 r
~O~I~A ~COD HdiF~ ~dIuL
~,, GHOD~H NOI£VDI~ID~dS £VWHO~t V.r. VG ~
:HDVd
60:rr £66r-qflO-8
LIS Tape Verification L~stlng
Schlumberger Alaska Computing Center
8-JUL-1998 11:09
PAGE:
25
** DATA **
DEPT. 9261.000 SIGM. PS3
SBHN. PS3 -999.250 SIGC. PS3
SDSI.PS3 -999.250 BACK. PS3
TCAF. PS3 -999.250 TCND.PS3
TSCF. PS3 -999.250 INND.PS3
GR.PS3 0.000 CCL.PS3
DEPT. 8558.000 SIGM. PS3
SBHN. PS3 61.499 SIGC. PS3
SDSI.PS3 3.510 BACK. PS3
TCAF. PS3 1348.006 TCND.PS3
TSCF. PS3 71.218 INND.PS3
GR.PS3 47.786 CCL.PS3
-999.250 TPHI.PS3
-999.250 SIBH. PS3
-999.250 FBAC. PS3
-999.250 TCFD.PS3
-999.250 INFD.PS3
0.000
47.239 TPHI.PS3
0.000 SIBH. PS3
75.825 FBAC. PS3
3720.446 TCFD PS3
395.820 INFD.PS3
-999.250
-999.250 SBHF. PS3
-999.250 TRAT. PS3
-999.250 TCAN. PS3
-999.250 TSCN. PS3
-999.250 TENS.PS3
75.115 SBHF. PS3
85.701 TRAT. PS3
15.650 TCAN. PS3
848.124 TSCN. PS3
68.657 TENS.PS3
-999.250
-999.250
- 999. 250
-999 250
1010. 000
53 561
1. 823
5593.506
295. 233
1269. 000
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/07/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/07/ 8
ORIGIN : FLIC
TAPE NAME : 98333
CONTINUATION # : 1
PREVIOUS TAPE :
COM~ENT : BP EXPLORATION, B-18, PRUDHOE BAY, API# 50-029-20702-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE ' 98/07/ 8
ORIGIN : FLIC
REEL NAME : 98333
CONTINUATION # :
PREVIOUS REEL
COMMENT : BP EXPLORATION, B-18, PRUDHOE BAY, API#
50-029-20702-00
elOH peseo
~ID/NO
966 ~ - qo~ei/~l - 60
:~ un~l
/, ,,,'/
eOe~oqow
uo!ss!u~uoo 'suoo s~O ~, ID
966l 6 0 BdV
":~V~i ~lOH(lfllid
O3AI:::IO_::I~I
0 '6~98
S'8~98
S'6~98
g'8~98
0 '0~98
0'/-I98
0 'SI98
0 'II98
S'8098
S'~098
0 'I098
0'8658
0'~Sg8
HDHD
......... HJ~HG GH/~/IHSNI1 ~NH~U~AIflOH .........
S 'I~98
g '0~98
S 'I£98
0 'I~98
S'~98
0 '0Z98
S'LI98
0'~I98
0 '0198
0 '9098
0'C098
0 '0098
0 'SSS8
H~H~ HRI~HS~8
HO
S~/IHS HO& HAHD3 HNI~HS~
(H&4HG GHHDSF~H) (R~G~&S O.T. SHSS~ TT~ - ~G ~/IHS HAHO~
09'~I 0'9CI8 00S'~
00'/-I 0' C66/- 00S'S
00'9~ 0'S0~6 000'/-
00'L~ 0'58S8 S~9'6
(~/g'Z) ~HO'ra~ (Zm) ~a;~ac~ (~z) az'rs (~) az~s &ze
ONISVO SHHqqIH(~ ONIS~O H~OH NH~O
OC'S~
gL'EL
SL'~L
OHIH~S NOI/~DD~OH~
ONIH~S GHC
ONIH~S GNC
ONIH~S ~SI
SI~ :~A~ sT ~ alT~qns
0 'I~68
0'6168
0'gI68
g'£068
0'~068
0'8688
0 '9688
0'~688
0'8888
g'L888
g'6L88
0 'gL88
0 '0/..88
0'~g88
S' t,~,88
0'6~:88
0 '0~88
g'6~88
g 'g~88
g'~,~88
g'8188
g'~88
O' ~:T88
g ' ~'[88
g'g088
S'I088
0 'I088
g '0088
0'68L8
g'~8£8
0'8/../..8
S'99L8
g 'I9L8
o'~gL8
0'£~,t8
O'~L8
0 '6~L8
~'L~.L8
0 "1; ~:L8
~ ' LIL8
O' ~'OL8
g'gOL8
O' {;OL8
O' ~:OL8
g 'OOL8
0'6898
0 'g898
g'~898
g'8L98
g'LL98
O'LL98
0 '~L98
0'CL98
g "[L98
0 'TL98
O' ~,998
0'~998
0'~g98
0'~98
0'~68
0 'I~68
0'LI68
0 '0168
0'~068
0 '0068
0'8688
0 'g688
S '0688
g'6888
0 '~888
g'LL88
S'~L88
0 'gg88
O' LI~88
O' ~:~88
S'~:C88
g 'TC88
g'LZ:88
0'L~:88
0 ' T~:88
0 '9T88
0 'g~88
g' ~,T88
0'~88
0 ' 8088
0'~088
0'C088
g' ~:088
g 'T6L8
0 'LSL8
0 'TBL8
S'69L8
0 ' ~'9L8
0 'ggL8
0 'OSL8
g ' 9~'L8
0 ' ~/..8
0 ' T ~/..8
g' C~:/..8
0 'O~L8
~ '90L8
g 'gOL8
0 'gOL8
g' ~,OL8
O'COL8
g '0698
0'L898
0 'g898
g '0898
0 '0898
0'6L98
O'LL98
g 'gL98
0'~,L98
0'CL98
0 '9998
0'~,998
0 'gg98
g'~98
HOD~
HH~SSHH4 DNIS~D
H~YH S~D
HOD
H~YH S~D NOI~AHO&
H~YHHH&~M
H~YH OIQ~& SSOHD
H~Q
' (~(]/ES-AkrD~-IE) U~/DH~ :O~NI GaI~ DOT
'~IOH paseD HD/ND
: SHHgPw~H
0'CEE6
0 'E~E6
0 ' LOE6
0 '90~6
0 ' DOE6
0 '6LT6
g '09T6
~ ' 6~T6
g' D, GT6
0 ' ~gT6
0 'OGT6
0 ' 9D, T6
0 ' GD'T6
g' CD'T6
0 'TET6
0 '6TT6
0 'GTT6
0 ' ~TT6
O' ~;TT6
g'C606
0'C606
0'E606
0'8806
O'~B06
O'LL06
0 'TL06
0 '9g06
g ' ~,g06
g '9L68
0 '9L68
g 'gL68
0 'gL6B
0'6968
0'L968
g '9968
g '~968
g'D968
0'6968
0 '9968
0 '0968
g'~;~69
0'ED6B
0 ' TD'6B
0'8C68
0 'GC6B
810~ 9IS~[
(o~o) ;mo
~NIN.~O .~OHD
S 'I9/..8
O' ~:SL8
0'L~,£8
O' ~'t, L8
O' 6~:L8
S' L~:L8
0
0'~0L8
0' C0~-8
0'~0L8
g '00£8
0'6898
0'g898
g'~898
g' 81.98
g'/./.98
0'LL98
0 ' g~-98
0'~L98
g 'IL98
0
0 'g998
0'~998
0'8998
0'~g98
0'~98
0'6~98
S'8~98
0 '0~98
0' ~-T98
0 'gi98
0 'II98
g'8098
g' t'098
0 'I098
0 '86g8
0'~:Sg8
......... H&4aa OHJ./IHSN/1 &NHqVAI~H .........
0'0~6 0'0SS8
0'I~Z6 0'0SS8
H~dHO ~O~S H~dH0 ~H~&S
0'~9L8
0'9SL8
O'OSL8
S'9~L8
O'~L8
O'I~L8
O'O~L8
S'90L8
S'SOL8
0'SOL8
g'~0~8
0'C0L8
~'0698
0'L898
0 'g898
g '0898
0 '0898
0'6L98
O'LL98
g'gL98
0'~L98
0'~L98
0'9998
0'~998
0'T998
0'Sg98
S'~98
S'I~98
g'0~98
g'~98
0'0~98
S'L~98
0'~98
0'0~98
0'9098
0'~098
0'0098
0'ggg8
HNI~HSV~
:HH~
HDHD :HOOD HAH~D
SJ~/IHS HO& HAH~D HNIT~S~8
SS~4 Ok SS~ - V~0
HDHD
HOOD qOO~
000S'0 :&~HONZ H~H~
'soTT= ~e~ed~s uT un~ qoe~ .~o..= s~A~no p~ddTTo puc p~3Tqs
SHAHflD OH.T. IOH
O'~II6
g'CtI6
g'EII6
0'~606
g 'I606
0 'I606
g '9806
0'~806
0 '9/-06
0 '0/-06
S' ~,S06
0'C~06
g'9L68
0 '9L68
g' ~'L68
0'~L68
~'L968
0 '~968
0'C968
0'6968
O'Lg68
0'~g68
~'8~68
S 'I~68
0 '0~68
g'6~68
S'9~68
S'~C68
0 'I~68
0'6~68
0 '~I68
~'8068
0'~068
~'L688
0 '9688
g '0688
g 'g888
g'8L88
0 '0L88
g 'TS88
0'~88
0 'I~88
0'6~88
0 '0~88
g'6~:88
S'g~:88
0'LI88
S' ~:'1:88
0'C~88
S'~I88
S'TT88
0'9088
S "1:088
0 '~088
S '0088
0'C6L8
0'68L8
S' t, SL8
S '99L8
0
O' ~T'I:6
O'CTT6
S ' C606
0'C606
0 ' ~:606
0'8806
0'C806
O'LL06
0 'TL06
0'9~06
S' ~,S06
g '9L68
0'9L68
(:5 'gL68
0 'gL68
0'6968
0'/..968
0 'g968
g 'T968
0 ' 6g68
0 '9g68
0 '0g68
S'~:~68
0'~68
0 '~68
0'8~68
0 'gC68
0'CC68
0 '~68
0 'LI68
0 '0~68
0'~068
0 '0068
0 ' 8688
0 '5688
S '0688
0 'T888
S'CL88
0 'gS88
O' L~,88
g' l,t, 88
0'~88
g' ~:~88
g '~88
0'8~88
0
0 '9T88
0 'ST88
S'~,T88
O' 1,T88
0 ' 8088
0 ' ~,088
0'~088
g' ~:088
0 '96/..8
g 'T6L8
O'LSL8
0 'TSL8
~'69L8
O0000g'O
O00000'g~8
O00000'g~6
6~
:spzooe~ e~ea ICAO&
900I (0 #H~X~) aHOD~H V~VG ~
9I
mmmemmm
66 ~66 ~ ~ ~
66 g66 ~ ~ ~
66 g66 ~ ~ ~
66 966 ~ ~ ~
S-flcI I 89 819~ IH4N ~
I~9 I 89 8I~ HDHO I
DoH slD dX& dia q:~6u~,'I sz~.s
s~Tua ssIdmeS spoD Ioo& amen
Hk~fH& HH~ H.T.~H(] HNO
%DIS~"'i%f :
H4OqS H&HON :
8I-~ :
(%DlSlfllf) NOI&I/%IO'IaXH a8 :
HIIOD
N&
'A~H ~O HqOH NH40 (AL GHHD&%~ H&~H~ S~M HDHO
'IH4N H&IM ~H~IHS HHHM~RN ~
:
0'~Z6
0'~6
O'LO~:6
0 '90E6
0'~0~6
g' L61~6
0 '6LI6
g '09X6
g ' 6gX6
O' ~,gX6
0 'ogI6
0 '9~I6
O'g~X6
g' C~,~6
0 ' IZ'[6
0'6~6
sa~lq 900I :q~uaI paooaa ~m~lxeH
sa~lq :9 :q~uaI p~ooaa mn~lulH
· --spaooaa gS: Z :alllqns
sum~ep 90~L 89 :apoo doH
:A=~mmns ~u~poo~p ~poo uo~u~s~d~I
·
0'6898 0'0698
S'8898 0'6898
0'S898 S'5898
S'I898 0'C898
0'I898 S'~898
0'8&98 0'0898
S'S&98 0'~£98
S'~L98 S'9L98
0'S£98 0'9£98
0'~L98 S'S~98
S'CL98 0'~98 S'~L98
S'~L98 0'E£98
S'~998 S'9998
0'~998 S'5998
0'£998 0'~998
S'L~98 0'6~98
0'&~98 S'L~98
S'~98 0'~98
S'S~98 0'LC98
0'I~98 S'~98
0'0£98 S'0~98 0'~98
S'6~98 S'~C98
0'S~98 0'£~98
0'~98 S'9~98
S'~98 S'S~98
S'~98 S'~98
0'~98 S'~98
0'8~98 S'0~98
0'8098 S'0198
S'~098 0'S098
0'86S8 0'0098
0'6&S8 S'08g8
O'LLg8 g'8£g8
0'9558 O'LSS8
S'SSS8 S'9558
o'~gg8 0'9gg8
S'~S8 g'~g8 g'9~g8
IH4N HOHO H~4Ha HNIqHSV~
......... H~H~ ~H~/IHSI~I ~HHT~AI~H .........
SIq :aclA~ sT E aI]~qns sd~&
S'~:88
g'~88
S' ~:~88
0'~88
g '/..]:88
S' ~:]:88
0 '9088
g 'I088
0 "i:088
0 '0088
0 '66L8
0 'S8L8
0 ']:8L8
0 '08L8
0 '8L£8
0 '~LL8
0 'L9L8
0'C9L8
S'8SL8
0'8gL8
O'LSL8
0 '9SL8
S'CSL8
S'6~L8
0 ' ]:eL8
S 'OCL8
0 'IIL8
0 'OIL8
S' ~:OL8
O'~:OL8
0 'OOL8
S'6698
0'~,698
S '0698
0 '0698
0'~,C88
0'~88
S ']:~88
0 ']:C88
S ' ]:088
g '0088
0 '0088
S'~6£8
0 '68L8
g'~8L8
g ']:8£8
S'CSL8
g'Lf~L8
g ' Or:L8
g't:~L8
O'C~L8
O'~&8
0 ']:eL8
0 ' 8'1:£8
g
S 'S]:L8
O'C]:L8
S ' ]:]:LB
g "1:698
0 ']:698
S '6898
S
S
0
0
0
0
S
0
S
0
S
0
0
0
0
0
0
0
S
0
0
0
0
0
0
S
0
S
0
0
0
0
0
S
S
S
S
0
S
0
S
0
0
0
0
0
S
0
0
' t, C88
'9C88
'9C88
' ~,C88
' ~,:88
'CC88
'CC88
']:Z88
'~I88
'8088
'~088
'C088
'C088
'~088
'I088
'I088
'96L8
'I6L8
'L8£8
'~8L8
'~8L8
'C8L8
'C8L8
'08L8
'LLL8
'69L8
'99L8
'09£8
'6gL8
'8gL8
'9g£8
'SSL8
'~SL8
'OSL8
'eCL8
'9~L8
'SCL8
'~L8
'COL8
'~CL8
'O~:L8
' L]:L8
'90L8
'SOL8
'COL8
'TOL8
'g698
'C698
'~698
'C698
']:698
'0698
0'~06
0 '0~06
S'~g06
0'6~06
0 '6106
O'gI06
S 'I668
S '0868
0 ' ~:/..68
'I/..68
S'8968
0'~968
S'6568
S' ~,~68
S' ~:68
0'~68
O' ~:68
' S'1:68
S'6068
S' ~,068
S't:068
"1:068
S'0068
S'/..688
'9688
'I688
'9888
S'~988
0'~988
g'~S88
0'£~88
'I~88
S'~88
0'~88
S'LL68
0'9L68
S'~L68
0'~L68
S'0968
S'8568
S'6~68
0'6~68
0'8C68
0'LC68
S'S~68
S'~68
0'~68
S'~I68
S'~I68
0'~068
S'I068
0'0068
0'6688
S'£688
0'L688
S*S688
g*~688
0'~688
g'g888
0'0888
S'0L88
0'LS88
g'I~88
0'~06
S'0~06
S'~06
S'6~06
0'0~06
0'~I06
S'I668
S'0868
S'LL68
0'9L68
S'SL68
0'~L68
0'~L68
0'0L68
S'~968
S'I968
0'0968
0'IS68
0'0S68
0'6~68
g'8168
0'L~68
S'9~68
0'9~68
S'S~68
0'S~68
S'~68
0'8168
0'9168
g'gI68
0'0168
g 'g068
0 'S068
0 ' ~068
0'C068
g'~068
g'I068
0'I068
0'0068
S'6688
S'8688
0'8688
0'£688
S'9688
0'5688
S'~688
g'6888
S'L888
g'I888
0'~L88
S'~988
0'~988
S'6588
0'Sg88
0'0S88
0'L~88
g'~88
0'~88
0'£~88
g'SC88
X~f~ .gOHG/TH~I :
8I-~ :
NOI,TAfHO~X.q d~ :
· ,.no - s ZHD&~-~Z Z /
N&
NM
ND
g'8I~6
0'L616
g'6~I6
O'~T6
0'AEI6
0'EEI6
~ '9EI6
0 '0EI6
0'III6
~'6016
~'0606
0'&806
0'9806
0'I806
~'LL06
O'~L06
~'~906
0 '9~C6
O'C~E6
O'CT~:6
0 '
g'gO~6
0 ' gO~:6
g'~6T6
g 'T6T6
O' 8/..T6
0'99T6
ii '09T6
g'SgT6
g'LGT6
O'LgT6
0 'ggT6
g ' C~T6
0 '
g'i:TT6
O'CTT6
g' ~:TT6
g'Z:606
g 'T~06
0 '9L06
O'~g06
g'8~,06
: S~H~,~H
0 'g~6
g' ~,~:6
0'9~6
G '9E~6
0'~6
0 ' 6T ~6
0 '
G'~T~6
0 '90~6
0 '~0~6
~'L6T6
G'~6~6
0'~6T6
0 '6LT6
G '99~6
~ '09~6
~ ' 8~T6
0 ' 8GT6
O'&~T6
0 'OGT6
~'~T6
~'C~T6
O'&~T6
O'C~T6
O'&~T6
0 'T~T6
~ '9TI6
O'~TT6
O'~TT6
G'~TT6
G 'TTT6
G 'OTT6
G ' 60T6
G'&OT6
0'~606
~ 'T606
0'8806
0 '~806
0'~806
0'8&06
O'&&06
G'~&06
G '9906
0 '~06
G'6~06
sa~Xq
saq~q ~9
:q~6uaI paooa~ ~m~!xe~
: q:~6uaI paooa:t
· --sp~ooa~ L9Z
s~n~ep 90~L 89 :apoD daH
:Kaemm~s 6u~poo~p apoo uol~e~uasaadaa SI~
O00000'gCg8 = q~dsa puH aI~& ade&
000000'~6 = q~da~ ~e~S aIT& ade&
6g
:sp~ooaH e~e~ Ie~o~
9I
mmmmmmm
66 g66 g~ ~
66 g66 ~ ~
66 g66 ~ ~
66 g66 ~9 9
I~D I 89 8I~g HDH~ I
pol~l sIO dA,T,
a~O nad
s~Tu~ saIdmes apoo IOO~ amen
& :~I q~dap sde&
HIF~I& HHcI H2~IHCI HNO
H~OqS H~HON : N~IOD
S'6£98 S'~898
S'6£98 S'0898
S'8L98 0'0898
S'9L98 S'8L98
0'9£98 0'8L98
S'SL98 O'LL98
0'S/-98 S'9L98
S'~L98 S'SL98
S'IL98 S'~L98
0'~998 S'5998
S'~598 0'9598
S'~598 S'~598
S'6~98 0'~598
0'8~98 0'0598
S' ~-~98 0'8~98
O' L~,98 S'L~98
S'~98 S'S~98
0'8~98 S'0~98
S'~-~98 0'6~98
S'S~98 0'L~:98
0'S~98 0'9~98
S'~98 S'~98
0'~98 S'~98
S'I~98 0'~98
0'0~98 S'I~98
0'6~98 0'I~98
0'6~98 S'0~98
0'~98 0'S~98
S'~98 S'~98
0'~98 0'~I98
S'8098 0'0198
0'~8g8 g'gsg8
0'6LS8 g'osg8
S'SLS8 O'LLS8
0'~SS8 0'9SS8
0'~SS8 O'ggg8
g'~S8 S'~S8 g'9~g8
IH~ H~H~ H&4Ha HNIqHS~8
......... H~H(] OHJ~/IHSH~ &NH~[~AI~OH .........
~'LLL~
O'L9L8
0
S '09/..8
S' 85/.8
S' LS/.8
S'CSL8
S'8~,L8
0'8t, L8
S'9~L8
S'S~'L8
g' Ct, L8
O'~:~L8
S'8CL8
S'LCL8
0'£~L8
g '9CL8
O'~L8
O'~L8
0 'I~L8
S'OCL8
0 'O~L8
S'6~L8
0'6~L8
S'9~:L8
g' C~:L8
0'8'[L8
S'LIL8
O'LIL8
~ '9~L8
0 '9~L8
S't, TL8
S 'ITL8
g 'OTL8
O'~,OL8
g' t:OL8
0'C698
0 '0698
S'6898
0 '6898
S'8898
0'/..898
0 '9898
0 '5898
0'8LL8
O'~LL8
S 'ILL8
g'6SL8
S'8SL8
0 'TSL8
S'Lf~L8
S'~L8
O' ~,~,L8
S'£~,L8
g'Et'L8
g 'OCL8
0 'OCL8
0'8~:L8
0 'gTL8
0 'STL8
0 'TOL8
0 'T698
~'0698
S'6898
S' ~:898
'08L8
'08L8
S'~LL8
S'CLL8
S'69L8
S'C9L8
g'~9L8
'T9L8
'I9L8
'09L8
'09/-8
'9~L8
S' ~:gL8
· OSL8
S'8~,L8
0'8~,L8
' L~L8
'9~'L8
'g~L8
'O~,L8
'O~'L8
g'6CL8
S'8CL8
'9CL8
'SCL8
S'CCL8
O'CCL8
g' ~:CL8
O' ~:£L8
'T~L8
'0£L8
'OCL8
0'6~:L8
'9~L8
O' ~:L8
'O~:L8
' 6TLS
' 8T£8
g'LTL8
O'LTL8
'9TLS
O'CTL8
'
'90L8
O'SOL8
O'COL8
'~698
g' ~:698
"1:698
'0698
S'6898
g'8898
0'L898
'9898
'g898
g'~898
0'9C68
S'IC68
S'6T68
S'L068
S'T068
0'8688
0'9688
S'~688
g'~888
0'~888
0'C888
0'9L88
g'0988
0'0988
g'6S88
S'L~88
g'~88
0'~88
0'gC88
g'~C88
S'~88
S'~C88
0'~C88
0'~C88
0'0C88
g'9~88
0'9E88
g's~88
S'~88
0'~88
S'~88
g'8~88
0'~88
S'C~88
0'C~88
S'~T88
S'~T88
0'9088
S'~6L8
S'~6L8
0'58L8
0'6LL8
0'9~68
0'~68
0'~I68
0'~I68
0'~068
g'~068
g'8688
g'8888
S'L888
0'9888
S'g888
S'9L88
0'~L88
0'~S88
S'SC88
0'g~88
g'~C88
0'~£88
S'~88
0'~C88
0'~88
0'~I88
g'~I88
g'C~88
S'~T88
0'~T88
g'6088
g'8088
S '9088
0'58L8
0'6£L8
0'LC68
g'CC68
0'CC68
g '0~68
g'~68
0 ' ~I68
0 '0T68
0'9068
0'S068
S'~068
0'0068
0'8688
S'~688
0'0688
g'6888
0'8888
0'£888
0'9888
0'g888
g'L£88
O'gL88
0'C988
g'~988
0'~988
g'~S88
0'0S88
0'L~88
g'~88
0'8C88
0'£C88
g'9C88
0'9C88
0'gc88
0'~C88
0'CC88
0'~688
g'I£88
0'8~88
0'£~88
g'9~88
0'9~88
g'g~88
0'g~88
0'~88
0'~88
S'9T88
0'9~88
0'g~88
0'~T88
6'~T88
0'CT88
S'CT88
O'TT88
6'0T88
0'8088
0'96L8
S'S6L8
O'L8L8
O'TSL8
g'~g16
g'6~16
G' L~,I6
'9~16
'9~I6
'I~I6
'~6
'0~6
'9~6
0'~6
~'60~6
' ~0~6
'~606
'~606
'OL06
'~06
0'~06
0'~06
S'8968
0'~968
'0968
0'8568
S'LS68
0'LS68
'9568
'SS68
'IS68
0'~68
0'LC68
S'0916 S'0916
0'0916 0'0916
0'6516 S'6SI6
S'8SI6 S'8SI6
O'Sg~6
S'~SI6 g'~SI6
S'CSI6 O'~SI6
0 '0S~6
0'8~I6
S'9~I6
S'~I6 0'~I6
S 'I~I6
g '9~6
O'I~I6
0'0~I6
g '9~I6
S'C~I6 g'~6
S'E~6
0'6I~6 0'6I~6
S'0~6
~'~0~6
O'SOI6
S'E606
S '~606
0'8806 0'8806
0'S806
0'~806 0'~806
S'9L06 O'LL06
S'SL06 0'9L06
O'~L06
S'8S06 g'6S06
S'~S06 g'gg06
S'OS06 g'~g06
g'9~06
0 'g~06
0'~06
0 'g868
S'SL68 O'LL68
0'SL68
S'~L68 S'~L68
0'IL68 O'ZL68
S'IL68
0'0L68 S'OL68
0'0L68
S'L968 0'8968
g'~968
0'I968 g'I968
0'6g68 g'0968
g'6968
g'sg68
0'8g68
S'LS68
g'9968
0'~S68
S'8~68 0'0S68
0'~68 0'C~68
g'~68
0'8~68
:spaooe~ e~eG Ie~O&
90011 (O #~dX.T.) aaOO.~a y.v.y<l ,~
~ 66 G66 ~
~ 66 G66 ~
~ 66 ~66 ~
~ 66 ~66 ~
9I
mmmmmmm
~ S-~ I 89 8I~ IH4N E
~ I4~ I 89 8I~E HOHO I
s~!u~ said=es apoo Ioo& a~eN
:saaano ~
HNFt~ 2~3}{d ~CI HNO
(~9 #H4A~) C~ODHH &F~HO& ~
~HS~i~ :
H4OqS H~HON :
AY8 HOHGiTH4 :
8] - 8 :
('~{S~) NOI~O~dXR dR :
NnO0
N~
'IH4N H&I~ GHJ~/IHS HHH~ ~D/~H ~ ~O~/
0'~6
O'g~g6
g'~Z6
0'~C~6
0'6g~6
g'Olg6
g'9~g6
0'9~g6
O'g~g6
g'~6
g'9~6
g'g~g6
0'9~E6
O'~E~6
g 'I616
0 '~6~6
g '0616
0'~816
g'6LI6
0'L916
g'~916
g'9~E6
0'9~g6
O'g~E6
0'~E6
g'9~6
0'96E6
0'~6
0'~6
O'Og~6
g'9gg6
0'~6
0'6~Z6
g'glg6
g 'I616
g '0616
0 '06~6
0'~816
~ ' 6£~6
0'~9~6
~'~9~6
sa~Xq 900~ :q~6uaI p~ooa~ mnm~xe~
· -'sp~ooa~ :o~ ~ :aTT~qns
smm~ep :T~T 89 :apoD
:Xaemmns ~u~pooap apoo uo~4e~uasa~da~
~aa& = S~TUfl q~da~ aIT& ade~
00000~'0 = 6UTOedS IaAa~l a~T&
000000'~8 = q~doa pu~ alT& adc&
000000'f~:6 = q~da~ ~ze~S alT&
:A~eununs 6uTpooap apoo uoT~e~uasa~da~ SI~
%aa& = s%TuR q%daG alT& ade~
00000~'0 = BuToedS IaAa7 alT& ade~
000000'~C~8 = q~daG puH alT& ada&
O00000'~g~6 = q~daG ~e~S SIT& ada&
6~
:sp~ooeH e~ea Iago&
900I (0 $.'q'dA,I,} ~HODHH V.T.~C! ~
I 66 ~66 8~
I 66 ~66 8E
I 66 ~66 8E
I 66 g66 8~
9T
mmmmmmm
~ I4~0 I 89 A~ND HDH~ ~
poH SlO d~& dA& q~Bua~ azTs
A~O A~O ~0~
I~%T I4~T Ia~T Id~T
S~TU~ saldmes apoo IOO~ amen
: saA~no ~
& :GI q~dap ada&
HkW~H& HH4 ~(] HNO
(99 SH4A~) C~ODHH ~AHO.~ ~
t~SI~I~ :
H4OrlS H~HON :
R~8 HOH~IH~ :
8I - ~ :
(~HS~rl~) NOI~rHO'I~XH d~ :
Z ~I~V HO& ~HDYHHA~ HHHM ~OflN 9 '2~Dfl& 'IH4N 'HOHD
' SS~Z4 GHOt~HA~
: SHH3re~H
8T~C
HDFelHAI~ NI ~H~NI SHSS~
000g ' 0 : ~NI
~s~unoo puno~6~oeq pue Ze~ e~e6 T sse~ pa~Tpa pa6e~aAeu~ :uo~naN pasIn4 -sa~no ]Ie ~o~ sassed pa~Tpa ~o a6e~aAe o]~a~T~ :uo~naH pa~esuadmo0
:~~ ~I~
~~H
HNOZ qI0 NI NOI~VZIT%54HON H~VH &N~0D HNIqHDq~
000'0
00'0
HN0&SGN~S
0'0
000 '0
000 '0
000 '0
0'0
0
0'0
0'0
00 '0
HH&VM F~S
0'0
0 'gO~6
000 '0
~X~9~8
Fa8~8/Fa0SZ8
VN~I6£
TOO&
0'00gl
0'0~6
0'0gg8
0'~6
96-H%~-60
l'I 'HHA 100£ 'AHH
96-H%fH-60
: (~) H~4Ha 0HIS~fD S,HHDD0q
: (J~) H~Ha 0NISVD S,HHT~IHG
: (NI) HZIS ~IH H~0H NH40
V~%fG DNIS~fD GN~ H~OHHHO~
0 'g~6
0'9£E6
H.~.clHG HO~S
puno~6xoeq Re2 ~saI~ a~e2edas u~ ssed qoea ~o~ e~ep ~apeaq 6oi pue
SHAH~O
HH(~F~H
SI~[ :aclX~, s~ 9 Slx.~qns ade&
· .-spzoowz 9AI 9 :wI~qns
s~n~wp ~086£ 89 :~poD deH
:Azw=ums ~u~poo~p wpoo uo~w~u~s~zd~z
~aa& = s~Tufl g~dao aTT&
0000~:'0 = ~uToeds TaAa~ aTT& ade&
000000't~8 = q~daO puH aTT& ade&
000000'6t:6 = q~daQ ~=e~S a~&
TOT :spaooaH e~eO Te4O~
66 ~C9 ~P ~ ~
66 969 ~P ~ ~
TO 068 ~ ~ ~
66 ~66 ~ P ~
TO OTC ~ ~ ~
W/ T 89 8T9~ 1~ 8
HH/& T 89 8T~ OaS L
T 89 STP: qDD 9
S~D T 89 8T9~ NSS ~
S~D T 89 8T~ NS~ ~
q-~ T 89 8TP~ ND ~
S-~d T 89 8T~ DND ~
I~D T 89 8T9~ HD T
poH SlO dA& dA& q46us7 azTs
A.TD AaD 607
s~Tu~ sald~es apoD TOO&
& :OI q-4dap ~de&
HH~rH& HH~[ H~HO HNO
(P9 #H~R&) OHODHH &WAHO& ,
I~HSFI~ :
H~OqS H&HON :
A~G HOHO/1H~ :
8T - ~ :
(I~HS~/~) NOI&%rHOq~XH ~ :
lillOD
N&
ND
· T SS~'4 : S~
0'0
. . oosv&s uooz
0'0
0'0
:(~&) MOONIM ONIZIqES~HON
: (~&) MOONIM DNIZIq~fHHON cIO&
:q~6ua~ p~ooa~ m'taTUTN
HNOZ qIO RI NOI~ZIqk54HON H~H ~NIIOD HNIqH~q~
000'0
00'0
HNO&SGN~S
q~q~HHH~
: (NI) NOI~D.~HHOD aqOH
: A&ISNHG XIH&%5{
: X IH~k~H
: (Ts54HHH,~. HO ~AHHH~IdH) H~;~ 5[OO~
qOO~ NOH/ZlHN
0'0
000 '0
000 '0
000 '0
0'0
0
0'0
0'0
00 '0
HH&%fM %~S GHHH&~[I&
0'0
0 'g0~6
000 '0
:(~) H&4Ha DNIS~D S,HHDD(YI
:(~./) H~4HG DNIS~D S,HHq~IHO
:(NI) HZIS ~I~ HqOH NH~O
~&~O DNIS~D ON%f H~OHHHO~
YXSI~
~X~9~8
%,'as~,~s/Faosz8
NOHJ~qHN OH&~SNH~OD ND
A%IH~D HD
aaA& uoo& a~oD uoom aO~NaA
(~O&LO80Z aom) vNIa&s ~oo&
O'OOgI
0'0~6
0'0gg8
0'~Z6
0'8~C6
96-H~A-60 ~Z~I
~'~ 'HHA ~00£ 'AHH SAS&
96-H~A-60
O'L~6
0'8Z~6
H~HG 40&S
puno~6xoeq Re~ IsalT~ a~e~edas uT ssed qoea ~o~ e~ep ~apeaq 6oi puc
SHAH0.~
HHf~HH HqI&
· ''spaooaa 9LI L :alTlqns
smngep 99L6E 89 :apoD daH
:~aemmns 6uTpooap apoo uo~e~uasa/daa
0000~E'0 = ~UTOedS I~A~q oIT~
000000'AD~8 = g~d~O puH SIT&
000000'I~E6 = q~d~o ~xe~S oIT~
I0I :spaooeH e~e~ IagO&
mmmmmmm
I0 068 ED D D
66 g66 ED D D
IO OIE ED D D
s~u~ seIdmeS epoo IOO~ amen
:SaAa~qO 8
& :0I q~dop ada&
HH%~/HH~H~H~ HNO
(99 SH~[A~) (I~ODHH .~.%UAHO.~ ~
H4OqS H~HON :
;~%f~ HOHOflH~ :
BI-8 :
(%9~SFl~) NOI~Oq4XH dB :
NflOO
· Z SS~fcI : S~
0'0
0'0
0'0
: (~&) MO(]NIM ONIZIq~AHON HS~
: (~&) MOONIM DNIZIq~AHON ~0~
HNOZ ~IO RI NOI~ZI~54HON H~ ~N/IOD HNIqHQq~
000'0
00'0
: (HI) NOI~OHHHOD HqOH
: A&ISNH~ XIH~
: X I
: (~k54HHH& HO q~AHHH&I~H) HdX& ~OO~
qOO& NOH~HN
0'0
000 '0
000 '0
000 '0
0'0
0
0'0
0'0
00 '0
HH.~.%fM F~S QHHH&qI&
0'0
0 '~0P6
000 '0
:(J~/) H~Ha DNIS~D S,HHDDO~
:(~/) H~a DNIS~D S,HHq~IH~
:(NI) HZIS ~I~ H~OH NH~O
~&~G DNIS~D GN~ H~OHHHO~
~X~9~8
vas zs/vaosz8
0'00gI
0'0~6
0'0gg8
0'~9~6
0'8~6
96-H%"A-60 8g~I
I'I 'HHA 100£ 'AHH SAS&
96-H~r~-60
O'L~6
0'8~6
puno~Bxoeq ae~ tselT~ e~e~edes uT ssed qoee ~o~ e4ep ~epeeq BoI puc
SHAHRD M~fH
:HH~
HHQFaH HqI&
SI~ :adX$ sT 8 alT~qns ade&
89 : ~poD d~H
:Kaemmns 6u~poo~p apoo uo~e~uasa~daa SIq
0000g~'0 = 6u~oeds IaAs~ sI~& ade~
000000'6~g8 = g~daG puH aI~ ade~
000000'IGC6 = qsdaH ~le~S al!& ade&
EOI :spaooaH e~eG Ie~o~
s~Tu~ said=es spoo IOO& amen
: saaaxtD 8
HHFS~ HH~ H~,clH~ HNO
(99 SH~R~) C~0DHH ~AHO~ ~
H40qS H~HON :
X~8 HOH~IH~ :
8I-g :
NnOO
N~I
NO
0'0
: (ar) "xoo ,
gt0I : (SdO) H~fDS HOIH H.~.~fH ~NflOO HYHN
0 : (S~D) HT~DS M0q H.T.%fH .T.N~IOD H~&
HHHNIONH GqHI& A~ ~HS SHT~DS H.T.~rH ~N/10O HNIqH~q~
0'0
0'0
: (&-~) ~O~NI~ DNIZIq~AHON HSd8
: (~&) MO~NIM ONIZI~'HON ~O~
s~Xq
: q~,6ua'E p~ooa..~
0 = ~GOO NHa&~
· spuooas 8~'0I = a~T~ uo~no~xa
d&9:I 96 H%f~ 8I uoH :uo~nosxa ~o
sa~Xq ~I :q~BuaI p~ooa~ mn~x~H
IO
IO
/96
$O:).lA.i~l~ Oll.ilO. I!~ Sel~¥
alOH pasco
~dOINO
t~66 ~ ' '1hi' - 8 L
: ~ un~l
%/ \~' V
S'L998
0 '/..998
0 '9598
S' ~,98
O' ~:~98
S"1:~,98
0 'I~98
0'/-~98
0 '9~98
~'~98
~'~98
~'~98
0'/-~98
HDH~
......... H.T.~H~ ~H,T,&IHSN/7 ~RHq~AI~)H .........
S'9998
S'5998
S' ~,598
O' ~:~'98
0 'I~98
S'0~'98
S'6~98
S 'S~98
0 'S~98
0'~98
0'~98
~ 'I~98
0'9~98
HD
SDH~
:AN~NOD DNIDDOq
:GHDDOq
:HH~HIN
:HHS~TN N~H
:H~OD HAH~D
:HaOD ~OO~
S.T.&IHS HO& HAH~D HNI~IHS~8
(H,T,~HO O.gH~SFH~) GH~GN~AS O~ S.gSS~ q~ - ~.T,~G &&IHS HAH~D
O0'LI 0'9~I8 OOS'S
00'6~ 0'S0~6 O00'L
O0'L~ 0'5858 S~9'6
O0'~L 0'969~ SL~'~I
(~&/aq) &HOIa~ (&&) H&aa~ (RI) aZlS (RI) aZlS &IS
DNIS~D SHH~IH~ DRIS~D H~OH NH40
O~'S~
SL'~L
g68I
DRIH~S NOI&DB~OH~
DNIH~S (]HE
DNIH&S ~Ng
DNIH~S ~SI
SI~ :adA~ sT : alT3qns ade&
O' 9~:~:6
S ' 0'!: ~:6
0 ' 0'1:~:6
S 'S0~6
0 'S816
~'LL~6
O' ~:916
S'~916
0'~916
0'6SI6
S'8516
0 '9516
0 'SSI6
0'9916
S '5916
0 'S~I6
0 'SII6
§'9II6
0'9II6
g'9606
0'9606
~'~606
S'8806
S'gS06
0'CS06
0'8568
0'8~68
0'L~68
S'LI68
0'LI68
S'9168
0'5688
0'9688
0 'I688
S'0688
0 '0688
S'6888
0'8888
S '0888
0'L988
0'~C88
0 'SI88
S'£I88
0'~I88
0 '9LL8
S'~.LL8
S'~L8
0'~;-8
0 'O~t8
S '9~L8
0 '9~L8
0 '9IL8
g ' S'I:L8
0'~698
S 'I698
0 '0£98
0'8998
O'~EE6
O'ZEE6
0'60E6
0'80E6
S'EOZ6
0'9816
S'9LI6
g'~916
0'~916
0 'I916
0 ' 8~I6
O'ASI6
S'9SI6
0 '9SI6
0 'S916
0'9916
S'9~I6
S'~ZI6
0 ' 9II6
S'~II6
0'Z606
0'~606
0'L806
0'~S06
S'~S06
0'£568
O'LE68
~ '9~68
0'LI68
S '9168
0 '9168
S'~688
0'9688
0 'I688
0 '0688
S'6888
S'8888
0'L888
0 '0888
0'L988
O' ~:~88
S'~I88
S'gI88
S'~I88
S 'gAL8
g'~.LL8
g' ~:£L8
S 'I~L8
S'6~L8
S ' 9~:L8
S'S~L8
S' S'IiL8
g'~IL8
0 'I698
0 '0698
S'8998
O' ;-998
.'r,flO' ~t'IHO~L~'I& & /
.(I~,I,&IHS. O,I, O~HD.'r.'~n.~I H.T. cI~(I NO~;I,I'IHN SS~cI .'r.s~I&
· A~rH
a~IOH N.g40 0,~, G.~HD.~,k~t H~4.ga A~fH ~IN~D SS~4 $SHI& (l
:SMO~I~O& S~ .gHllGa~OH~ &~IHS
' ~NIOOOq
O~ HOIH4 ~HSHIG Sq~ E~ ~ HH&~F~S &O S~ I0E GH~74
&&O SNOI~DHHHOD ONIS~FO
~E9'0I = NOI~DHHHOD HHdI~D
&~O ~SIHD
XIH~HNO&SGNn~S :S~[H~ PNI~Oq ND
· alOH p~swD HO/ND
:
G'gGI6 ~'~I6
O'g~I6 0'~I6
~'6II6 0'6I~6
G'g606 ~'~606
0'C606 0'C606
G'E606 0'E606
S'8806 0'8806
~'SS06 0'SS06
S'~968 0'S968
0'9568 S'gS68
0'~68 S'~68
O'AE68 S'9E68
S'9E68 S'SE68
0'9E68 0'SE68
0'II68 0'0168
S'8688 S'8688
S'~588 0'SS88
0'A~88 S'£~88
S'I~88 0'E~88
0'E~88 0'E~88
S'6188 S'IE88
0'£088 0'8088
S'£8L8 S'L8£8
S'08£8 0'I8£8
O'OLL8 S'69£8
S'9SL8 S'95L8
O'I~A8 0'I~£8
0'L~£8 O'A~L8
S'60L8 0'60L8
0'0898 S'8L98
0'6L98 S'LL98
~'8L98 0'9L98
0'8L98 S'SL98
0'E998 S'~998
0'I~98 0'I~98
S'8~98 S'8~98
0'IE98 S'0E98
S'6658 S'0098
0'0~58 0'0~58
IHEN H~EHG H~IqHS~
0'0~E6 0'09S8
0'E£E6 0'8~S8
· s~IT~ ~wzed~s u~ unz qow~ zo~ s~nzno p~ddTIo pu~ pa~Tqs q~dao
:HH~D~N HqI&
s~n~ep £~98 89 :~poD d~H
:Ax~ua~ns 6u~pooap apoo uo~$uasa~ds~ SIq
~sa& = s~u~ g~daG aI~& ad~
00000~'0 = 6u~o~ds Iaaa~ aI~&
000000'0~8 = g~d~G puH ~I~& ~d~
000000'09E6 = q~d~G ~I~S ~I~
:sp~ooaH e~eG Ie~O~
~ SH~A~ 9IOI (0 #H~A~) GHODHH ~G ~
0~
mmmmmmm
S9 O~A 98 ~ ~
S9 0~£ 98 ~ ~
S9 0~£ 98 ~ ~
S9 O~t 98 ~ 9
S9 0~£ 98 ~ ~
g~ I 89 8I~E SNH&
S~D I 89 819E ~D~&
S-~ I 89 819~ IH~N
I~9 I 89 8I~E HDH9
po~ sID d~ dAA g~Buaq az~s
AaD AXD
S$~U~ saldm~s apoD IOO~
:SaAInD S
& :GI g~dsp
H~SfH& HH~ H~HG HNO
(99 #H~A~) GHODHH ~k54HO~ ·
HdO~S H~HON :
(~-~-0Z-~Z) S~-S :
NOI.~AfHOq~XH ~ :
AaO' ~I HO&kg{a & /
~S
NnOD
N&
NM
ND
'A~H ~9 H~OH NH~O O& GHHDA~ H&~HG S~M HDHD
'IHdN H~IM GHA&IHS HHHM SNH& 9 '~D~N
'I SS~
0'09~6
0'9~6
S'0~6
O'LSI6
S'9516
0'9516
O'SSI6
S'~SI6
0'~SI6
:S~H
0'09~6
0'9£E6
0'0~6
S'0916
0'0916
0'6SI6
0'8GI6
O'L~I6
S'9516
-''spaosaa
:q%~UaT paooa~ m*n~TxeN
:q~SUaT p:ooa~ m'~TUTN
~ :aiT~qns ade&
S 'I0/..8
S '0698
0 '0698
S'6898
0'8898
0 '5898
0'6/..98
0'8t98
S'LA98
0'9/-98
0 'St98
S ' ~/..98
0'SL98
S' 1~/..98 0'9/..98
g' C/..98
0 '9998
S' ~'998
0'6598
S '9598
0 '9598
0 '9598
S'SS98
0'ES98
S' 6~'98
0'9~'98
S'S~:98
0'S~98
S' ~'~98 O' ~'~98
S' ~:~98
S'6E98
0 '6E98
S'8E98
S 'SE98
0 '0098
0 'I858
0'C958
0 ' 0~,S8
IHdN HDH9
......... H~HG GH~&IHSN/~ ~H~AI~H .........
(H,T. clH(I GHH~S~)
0'09E6 0'0LS8
0'~6 0'8SS8
H~HG 40~S H~HG
S'I0£8
0'0698
0'6898
S'8898
0'8898
0'S898
0'6£98
S'8£98
0'8L98
S'9L98
g'g~98
S'~£98
0'~98
S'~£98
0'CL98
0'9998
0 'g998
S '6998
S'LS98
S'9S98
0'9598
0'SS98
S'ES98
S'L~98
0'~98
0'SC98
S'~98
0'~98
S'~C98
S'0C98
S'6E98
S'8~98
S'g~98
0'0098
0'~8S8
0'~9S8
O'O~g8
I :B~N SS~d
HDHD :HGOD HAH/lO ~d
S~&IHS HO& HAHflD HNI~HS~
SS~ O~ SS~ - ~G ~&IHS HAH/10
H~HO
H~OD ~OO~
000S' :~NHI~IHDNI
~ :HHSHOR SS~d
's~I!~ a~eaedas u! una qoea aol ssaano psddTIo pue pa~l!qs qldaa
:HH~HflN
HHG~H HqI&
SI~ :sdi~ sT ~ slllqns adc&
0 '0188
~'~088
0'£088
S'~088
O' ~:088
0 ' ~ 6/... 8
0'88/..8
S '08L8
S'~LL8
S'F. LL8
0'~:9L8
S' T9/..8
0 "[9/...8
~'09L8
S' 8S/..8
0'85L8
O'LSL8
S' St, L8
0
0 ' ~,/...8
S' ~:~:t8
0 ' ~:C/..8
0 "lift8
0 ' 0 ~/...8
S' 6~:L8
0 ' 6 ~:/..8
S'8~:L8
0 ' 9 ~:/..8
S ' ~: ~:/...8
O' ~:~:L8
S'9IL8
S' ~:TL8
0 'TTL8
0'80/..8
0 '90/..8
O' ~,Ot8
O'~Ot8
O' ~:Ot8
S'~T88
0'~T88
S 'S8L8
S't, SL8
0 '08L8
~'SLL8
~ '9gL8
S 'S~L8
S 'TCL8
0 'TCL8
S '0£L8
0 ' S~:L8
S'~:L8
O' ~,~:L8
S'6TL8
0'6T[8
0 '8T~8
g' ~-T~-8
O'LT£8
0 '9TLS
S ' ST/..8
S'~:TL8
O'~TL8
O' ~:OL8
S'/..T88
S 'ST88
O' ~:T88
S' ~:T88
S 'S088
0 'S088
0'~088
S' ~:088
0'~:6L8
0'68L8
0 '98L8
S' S8/..8
0'~:8L8
0 'T8£8
0'6~L8
0 'SCL8
g'~.LL8
O' ~:9L8
O' ~:9L8
0 'I9L8
~ '09L8
~'6~L8
0'6~L8
S'8SL8
0 'OSL8
S '9~L8
0 '9~L8
0 ' S~,L8
O'gt, L8
0 'SCL8
O'~'CL8
O'~t8
0
0
0 ' O~:t8
S'6~:L8
g'8~:L8
0 ' 8~:L8
S'L~L8
S 'S~L8
0 ' S~:L8
S' ~,~:L8
O' ~:L8
0 'O~:L8
S'6TL8
0 '6IL8
S'8TL8
S'LTL8
S '9TLS
S 'STL8
0 'STL8
S' ~:TL8
S'CTL8
0 'OTC8
S'LOL8
S 'SOL8
0 'SOL8
O'~OL8
S' ~:OL8
S 'IOI6
0 'I606
0 'I&06
~ '9868
0'9868
0'~868
0 '9£68
S 'SL68
0 'SL68
S'0968
0'CS68
S 'IS68
0 '5968
S'LC68
~ ' 9~:68
0 '0~68
O' L~:68
S '9~68
0 '9~68
S'6168
0'6068
g '9688
g 'I688
S'~888
S'9588
0'8988
S 'g~88
0'9~88
0'C~88
g'Z~88
S'LI88
S 'SI88
0'9606
0'E606
S 'I606
0 'I606
0'9806
0'Z806
S'E806
S 'gL68
S 'I968
0 'I968
S '0968
0 'L~68
S '~I68
S'9168
S 'I068
0 'I068
S'~688
S 'I688
S'6888
S '8888
S'L888
0'L888
S '9888
0 '6588
0'9S88
0'~g88
0 '9988
0'~988
0 'I988
S'£~88
S'~88
S'9016
0'9606
0'~606
S 'I606
0 'I606
0'9806
S'~806
0'~806
O'~t06
g'8868
0 '9868
S'~868
g'Lt68
O'LL68
S '9L68
S 'SL68
O' ~:968
S'CS68
0'~S68
0 '9968
S 'I968
S '0968
0 '0968
S'8C68
0 '8C68
S 'I~68
S'L~68
0'L~68
0 '9~68
S '6168
0 '9168
S 'gi68
0 '0168
S'~068
S 'I068
S'L688
0'~688
S'~688
S '0688
0 '0688
S'6888
0 '6888
0 '8888
0'g888
S '6S88
S'8588
0 'SS88
g'~g88
0 '0S88
0'L988
0 'g988
S'~988
0'L~88
g'g~:88
0 'g~88
S'9Z88
0'9~88
S'~88
0 '0~88
0'8188
9 S9 O~t 98 ~ ~
9 S9 O~t 98 ~ ~
9 S9 0~£ 98 ~ ~
9 S9 0~£ 98 ~ ~
po~ SlO dA& dA& q~Bu~q sz!s
S~D I 89 819Z ~D~IN 9
SdD I 89 819E ~Dfl.~ ~
S-~I~ I 89 8I~Z IH~N E
I~f9 I 89 819~ HDH9 I
s$~u~ sald~es apoD IOO& amen
:S~AanD S
& :al g~d~p ~d~
H~fH& HH~ H&~HG HNO
(99 #H~X.~.) GHODHH .~.~HO& ·
k~ S ~f'l~ :
H~OqS H.~.HON :
X~f~ HOHGflH~ :
(gT-I~-0Z-gZ) 8I-~ :
NOI.~.k~HO~XH ~ :
NnOD
N&
NM
ND
'IH~N H~IM GH~IHS HHHM SNH~ 9 '~D~N
'E SS~
0'09E6
0'£S~6
S'ZSE6
S'6Z~6
S'8CE6
S'9Z~6
0 'SCE6
0 'I~Z6
S '0~6
S'S0~6
S'~816
S '0916
0 '0916
S'6516
0 '9516
0'SSI6
S'9516
0'S916
S'L~I6
g'9~I6
S'E~I6
0'CZI6
0'~I6
0'6II6
0'CII6
S'~016
:S~H
0'09~6
~'0~6
0'05~6
O'A~Z6
S'9~6
S'S~6
O'C~E6
0'0~6
0'E816
0'I916
~'0916
~'6~I6
0'9~I6
0'L916
g'8~I6
0
~'6II6
~'EII6
~'g016
:g~BuaI paooaa ~n~xeN
:g~BuaI paooaa ~n~u~
~ :aI~gns adc&
s~n~ep A~98
89 :apoD d~H
:Aaemmns 6u~pooap apoo uo~e~uasazdaa SIq
~aa& = s~ua q~daG aI~& adc&
O0000g'O = 6u~oeds IaAa~ sIT&
000000'0998 = g~daG puH siT&
000000'09~6 = q~d~ ~X~S ~I~
OE
cj9 OEL 98 I;'
~ SH,T,A~ 9IOI
S ~: : spaooeH e~,eG I~o.~.
S'5898 S'5898
0'0898 S'0898
S'LL98 0'8L98
S'9L98 S'LL98
0'SL98 0'9£98
S'~98 0'S£98
0'~£98 0'~£98
S'~£98 S'C£98
0'C£98 O' ~/-98
S'0£98 0'I£98
S'5998 0'9998
0'5998 0'5998
0'SS98 S'~598
S'~598 0'~598
S'IS98 S'~598
0'S~98 0'9998
0'8~98 S'6C98
S'£~98 S'8~98
0'/.~98 0'8~98
0'9C98 S'9~98
0'S~98 0'S~98
S'~C98 0'~98 S'~98
S'0~98 S'I~98
0'0C98 S'0~98
O'/-~98 S'£~98
0'9~98 0'£~98
S'S~98 0'9~98
0 'S~98 S 'S~98
S'8658 S'0098
0'I8S8 0'~8S8
S'L/-S8 S'6£S8
S'9958 0'6958
O'SSS8 0'9558
S'~SS8 O'SSS8
0'~SS8 0'~SS8
S' 8~58 S'8~58
0 '0~S8
HDH9 H.T.~H~ HNI~HS~
0'0~S8
IHdN
(H.T. clH{(I <IS[Ht'IS~I4)
0'0~6
0'~E~6
H~HG ~O~S
· saI~ a~ezedas u~ unz qoea
SI~ :adA~ s~ 9 aI~qns ade~
0'68£8
0'88£8
O'~LL8
'ILL8
'S9L8
s'fgL8
'I9L8
'I9L8
'09L8
'09L8
'8SL8
g'LgL8
S'95L8
' 8~'L8
S'L~'L8
O' t,~,t8
0 ' ~:~,/...8
S'6~L8
S'8~L8
0'8~L8
g' ~:~t8
S'6~:L8
'S~:L8
'S~:L8
S' ~:t8
O' ~,~:t8
O' ~:~:L8
~' ~:~:L8
O'~:~L8
'S'[£8
S'LOL8
'90/..8
S'OOL8
g'6698
0'6698
S'8698
g'6898
0'6898
S'8898
g'£898
S '9898
S'~8L8
S 'O8£8
S'~L£8
0 'I£L8
0'6~L8
S '9~£8
O'~L8
S"[~L8
O' 6~:L8
S'8~L8
0'8~L8
O'L~L8
0 '9~L8
S'S~L8
O'S~L8
O'~L8
O'L~L8
S '9~L8
O'~L8
S'~L8
O'[~L8
O'~L8
O'~OL8
S '~OL8
S '06L8
0 '06L8
0'S8L8
S "[8L8
S'SLL8
O'~,LL8
O'r. LL8
S'~LL8
S '99L8
S '59L8
S'~9L8
S "[9L8
S'09L8
0 '09L8
S'6SL8
0'6SL8
S'8S£8
S 'OSL8
0 'OSL8
S ' St, L8
S ' St, L8
S' ~:~L8
S · O~,L8
0 ' O~,L8
S' 6~:L8
0
O't, gL8
0 ' ~: ~:/...8
O' ~:~:t8
S'OgL8
S'6~:L8
0 ' 6~:L8
S'8~:L8
0 ' 8~:L8
S'LF. L8
S'9~:L8
0 ' 9~:L8
S'S~:L8
S' ~'~:L8
O' t,~:L8
S' 8'[L8
S ' LT. L8
0 ' 9'[L8
0 ' S'I:L8
0 ' ~"1:L8
S' ~:'[L8
O' ~'[L8
S'80L8
0 '80£8
O' ;:OL8
O' ~:OL8
S "[OL8
S 'OOL8
0 ' O0/..8
S'6898
0 '6898
0'8898
0'/..898
S '9898
S 'I968
0'SS68
0 '0568
0'6~68
S'8~,68
S'~C68
S'C~68
0'6~:68
S ' 9~:68
O' ~:68
S'~68
S' 6'[68
0'8068
S'S068
S' ~,068
S'~068
0'L688
g'8888
0'8888
S'L888
0 '9888
0 '5888
S' ti, 88
S'9t, 88
0'~,~88
S' £~:88
S'9~:88
S' ~,~:88
O' £~:88
O' ~:~:88
0 'I~88
S' C'[88
0'CI88
O' t, 088
S' ~;088
S'~088
0 'I088
S '0088
0 '0088
S'06£8
0'~568
0'~568
S'IS68
0'Ig68
0'8~68
S'9~68
S'~I68
S'~I68
S'~068
0'~068
S'~068
S'I068
S'6688
0'6688
0'6888
0'8888
S'9888
0'~588
0'9~88
0'0~88
0 'S~88
S'~088
0'~088
0'I088
0'I6L8
S'C968
0'9568
S'CS68
S'~S68
0'~568
S'Ig68
0'IS68
S'0568
0'0568
S'8~68
0'9~68
S'S~68
0'I~68
S'L~68
0'~68
0'~68
0'0~68
S'~I68
0'~I68
0'6068
S'9068
0'9068
S'S068
0'S068
S'g068
0'~068
0'I068
0'0068
0'6688
0'0688
S'6888
0'6888
0'8888
S'9888
0'9888
0'SS88
0'0S88
0'6~88
S'9~88
0'~88
S'S£88
0'6~88
S'8~88
S'9~88
0'9~88
S'S~88
S'~88
0'~88
0'LI88
g'9188
g'9088
s'g088
S'~088
S'~088
0'C088
S'~088
0'~088
g'I088
S'~6L8
0'~6L8
~807S HE~ON :
NOI&~IOT~X~ d~ :
NnOD
N&
'IH~N H~IM OH~&IHS HHHM SNH~ ~ '~D~N '~D~&
'~ SS~
0'09E6
S'8I~6
S'£816
O'ggI6
O'~EI6
0'6II6
~'9016
g'~OI6
O'EOI6
0'E606
S'I606
S'9L06
S 'SL06
0 'SL06
S'OL06
0 'OL06
~' ~,~06
0'8006
g' ~'006
0'8668
0'6868
0'8968
0';-968
S '9968
~ 'ISE6
0 'IGC6
O'L~6
O'g~6
~'8IE6
0 '8IE6
O'LIE6
0 '9IZ6
0 'gOE6
g'0916
S'ggI6
0'9gI6
g '9916
g 'S916
0 'g916
g'9916
0'~916
0'9EI6
O'~II6
0'Z606
S'~806
:SHHk54HH
0 '09E6
~'0SE6
0'05~6
S'~6
0'9ZZ6
S'~6
0'0~6
0'8I~6
O'LI~6
0'9I~6
~'~IZ6
~'~OZ6
0 '0616
0 'I916
S '9~I6
0'9~I6
O'g~I6
0'9SI6
~ '9~I6
0 '9~I6
S'S~I6
S'~I6
0'~I6
~'9~I6
S'OEI6
~'~II6
0'£016
0 '~016
0'9016
~'~606
0'~606
g'~606
S'~806
S'~£06
0'~£06
S '9£06
S'~£06
0 'Z£06
S'S~06
S'II06
0'8006
0'0006
~'I668
S'0L68
S'6968
S'8968
sa~Xq 9IOI :q~BuaI paooaa mnm~xeN
sa~Xg ~9 :q~6uaI p~ooa~ mnm~u~N
· --spaosaa E£E 9 :aI~qns
s~n~ep ~6E£I 89 :apoD
00000~'0 = ~u~oeds IaAa~ aI~&
000000'0~S8 = g~daG puH aI~&
000000'09E6 = qsdaG ~Ie$S aI~&
O~
S9 0~£ 98 ~
S9 0EA 98 ~
S9 0E& 98 ~
S9 O~t 98 ~
S9 0E& 98 ~
9 8~ I 89 819E SNH& S
~ S-~ I 89 8I~ IH~N
~ I~D I 89 819~ HDHD
pon sID
s~uo saIdmes aPOO IOO& amen
:SaAxnD S
& :OI q~dap ade~
Hk"ffH& HH~ H&~G HNO
(99 #H~A.T,) (]HODHH .TAllYHO& ~
:iaemmns Bulposap apos uol~e~uasaTdaa
~aa& = s~lu~ q~daG ail& adea
00000~'0 = 6UToeds IaAaq alT& adc&
000000'0~8 = g~dao puH siT& ade~
000000'09E6 = q~daG ~Ie~S aI~& ade~
6~
:spaooaH e~eG Ie$O&
~ SH.~,A8 900I (0 #HdA,~.) ~HODHH ~f~fG ~
9I
S~D I 89 A~ND ~DfiN
S~D I 89 A~ND ~Dfi&
S-fi4 I 89 A~ND IH4N
I~D I 89 A~ND HDHD
po~ SlO dXA c1X~ q~6ua~
s~!u~ saId~es apoD IOO~ a~eN
:saAInD 9
& :GI q~dap ade&
(99 #H~A~) (]HODHH ~HO~ ~
HdOqS H.~.HON :
NOI.T.¥HOq~X.g ~t :
· SHSS~f~
~ ~f HO& GHDk~HHA~f HHHM .~.DflN 9 '.~.Dfl& 'IH4N 'HDHD
· SS~f~ GHD~HHA~f
NnOD
N&
NM
:
8I~
HDHD
SHH81~N SS~ HGOD qOO& ~
HD%fHHA~ NI GHG~qDNI SHSS~
000~'0 :&NH~HDNI H~HG
· saAano laq~o IIe ~o~ sassed au~Iaseq o~e~s pa~pa ~o a~elaAe o~a~n4~Ie
~s~unoo punoaB~oeq pue Xea emme6 I asea pa~pa pa6elaAeU~ :uoa~naN PasIna
· saA/no lie lo~ sassed pa~pa ~o aBeaaae o~am-g~aV :uoa~naN pa~esuad~oD
:HH~N HqI~
HH~H H~I~
SIq :adA~ s! S aI~qns ade&
sa~q 900I :q~6ua~ p~ooa~ ~na~xeN
som~ep ~585~ 89 :apoo daH
HNOZ qIO NI NOI~ZIq~R/ON H~¥H ~N/7OD HNI~H~q~
~E9'0I
00'
: (az) Noz&Daauoa a~OH
: X~ISN.gO XIH~%UA
: X IH.T,~q~
: (qkS{H.gH& HO ~kg~H.gH&I~.g) H~A& ~OO,T.
~OO& NOH,T,~.gN
®
000'
000'
000'
0'
0
0'
0'
00'
~S~IO/O~H ~S
·
0'~096
000 '
VXOI~I
~X£0~
HH~t~qN ~OO,T,
HO,TAf/flGOH HOOD HSd/Id
'DOq H¥/~O0 DNIS~fD qDD
NOHJ/1HN OH~fSNH~OD ND
H~X,T, qoo~ .gOOD ~OO,T. HOONHA
(~OA,T,O~ O~ ~O,T,) DNIH,T,S ~OO&
0'008I
0'I9E6
0'0998
0'EgE6
0'0~E6
96-~/1£-8I 0E~I
I'I 'HHA I00f 'AHH SAS&
96-~flf-SI
0'8~E6
g'6£~6
HA4HO dO&S
puno~6~oeq Rea tSalT~ a~e~edas UT una qoea ~o~ e~ep ~apeaq 6Ol puc saA~nD
SHAHnD MVH
g :HHE[HflN ~qI&
HHGF~H aqI&
SIq :sdK~ sT 9 alT~qns ade&
s~n~p ~SLg~ 89 :~poD d~H
:Aa~mmns 6u~pooap apoo uo~uasaadaa
gaa& = s~u~ g~daG aI~& ad~
0000~E'0 = 6u~o~ds IaAaq aI~& ad~
000000'~8 = g~d~G puH ~I~&
000000'g~E6 = g~daG ~ae~S aI~& ad~&
~ SH~X~ 900I (0 #HgX~) GHODHH ~0 ~
9C
mmmmmmm
0 L8 ~0~ I~ ~ ~
0 L8 ~0~ I~ ~ ~
0 L8 998 ~9 ~ ~
I IE 0~I 6£ 9 ~
9 96 69I I~ 9 ~
9 ~9 0~£ 98 ~ ~
~ t9 I66 6I ~ ~
poH sIO dA& dAA q~Bua~ sz!s
AxD AXD
sg~u~ seId~s epoD IOO& e~eN
:saAxnD 6
& :GI g~dap ade&
H~k~H& HHd H~dHG HNO
(99 #H~A3.) GHODHH ~AHO.~ ~
%O{S~I%f :
H~OqS H.~.HON :
X%f~ HOHGI1H~ :
NOI,~.%fHO~XH ~ :
NnOD
N&
ND
· I SS~f~ :
·
: (ii) ttOaN~&S ~OO&
0SOI :(S~D) H~DS HDIH H~%fH ~N~7OD H~HN
OS :(S4D) H~DS aOq H&%fH &N~OD H~HN
009 :(S~D)
HHHNIgNH G~HI& A~ ~HS SH~DS H~fH ~NI1OD HNI~H~q~
O·
:(~&) MOGNIM DNIZI~g~{ON
:(&~) MOGNI~ DNIZIT~ON
s~Kq 900I
S~q Z9
'''sp~ooaI
:q~5uaI paooaa ~n~xeN
:g~SuaI paooax an~u~
9 :sI~qns ade~
HNOZ ~IO NI NOI~ZI~kg4HON H&k~H ~N/IOD HNI~H~q~
SE9'0I
00'
HNO~SGN%fS
O.
000'
000'
000'
O'
0
O'
O'
00'
~HSHIO/O~H ~$
O.
0 'gO~6
000 '
~fX0I~I
HH~N ~OO&
'OOq H%FI~OD DNIS~D
NOHJJ1HN OH~SNH~OD ND
A~H ~H~gfD HD
HOAkW~/lOO~ HOOD
H~A& qOOA HOOD qO0~ HOONHA
(~O&~O~ O~ ~0~) DNIH~S TOO&
0'008I
0'I~E6
0'09~8
0'E~E6
0'0~E6
96-Tflf-8I C0gI
I'I 'HHA I00f 'AHH SAS~
96-TD_C-SI
~'89~6
0'0~6
H~HO ~O~S
punoaB~o~q a~a /s*Ilg a~a~d~s ul uno qo~ Hog ~p a.p~.q 6oi pu~ s~aanD
SHAH~D Mk~H
9 :H~HQN HTI&
H~(~HH HTI&
SIT :adA~ sT L aIT~qns sde&
s~nqep ~0~ 89 :apoD daH
:Xaemmns 6u~poo~p ~poo uo~e~uasa~daa
~ HHqlkrH~ HqI& ~
0000gZ'0 = 6u~oeds IaAa~ aI~&
000000'Z~8 = q~daG puH aI~& ade~
000000'9~E6 = q~daG ~Ie~S aI~
ZII :spaoosH ~G Ie~O&
~ SH~A8 900I (0 #H~A~) (~IODHH ~ ~
9~
0 £8 E09 IZ ~
0 £8 ~0~ I~ ~
0 L8 998 S9 ~
~ L8 99~ L~ ~
9 96 6~I IE 9
9 ~9 0~L 98 ~
~ L9 I66 6I ~
9 ~ I 89 819~ NH~ 6
9 ~q I 89 819~ NH~ 8
~ N~/& I 89 8I~ GdS
9 I 89 8I~E ~DD 9
9 S~D I 89 819~ NSS
~ q-~d I 89 819~ ND
9 S-~ I 89 819~ DND
9 I~9 I 89 819~ HO
PoH sID d/~L RAA g~Bua~ az~s
s~ufl sald~es ~poo Ioo& ~wN
:saAInD 6
& :GI q~d~p ~de&
HN~H& HHd H~dHG HNO
(99 #H~A.I.) GHODHH .T. Yd54HO& ~
~IS k.'I~f :
HdOqS H,~.HON :
X~ HOHGflHg :
(~I-II-0E-gE) 8I-~ :
NOI,~.~HO~XH ~g :
NDOD
N&
ND
· ~ SS~fd· ' S~H
·
·
:(&&) MOGNIM 9NIZIq~"AHON
:(&&) MOGNIM 9NIZIq%UAHON
~a~,~q 900I
sa~,,~q ~9
· --spaoo~a 88I
:q~BuaI p~ooaa uma~xeN
:q~BuaI p~ooaa um~u~N
£ :aI~qns ade&
HNOZ qlO NI NOIK~Zlqk54HON HKk~H KNDOD HNIqHDq~
SE9'0I
00'
HNOKSGN~S
: (RI) ROIKOHHHOO HTOH
: AKISRHG XIHK~/H
: X IH&~4
: (~HH~ HO q~HH~I~H) HdA~ qOO~
qOO~ NOH~HN
.
000'
000'
000'
O'
0
O'
O'
00'
O.
0'~096
000'
krXSI~E
~fX0IZI
~rXL0~
TOOK
'DOT H~FITOD DNIS~D TOD
HdAK TOOK HGOD qOOK HOGNHA
(~OKKO~ OK dOK) 9NIHKS TOOK
0'008I
0'I9E6
0'09~8
0'ZgE6
0'09E6
96-TDE-8I 9C~I
I'I 'HHA I00f 'AHH SAS~
~6-T~f-SI
~'O~E6
O'ERS6
puno26~oeq Re2 ~saI~ a~eaedas u~ un~ qoea ~o~ e~ep 2apeaq 6Ol pue
SHAH~D M%rH
:H~LqN
s~n~p 9L~9£ 89 :wpoD dWH
:A~emmns Bu~pooap apoo uo~e~uasaada~
0000~'0 = 6u~o~ds Iaaa~ aI~& ad~&
000000'99~8 = g~daG puH aI~&
000000'8~E6 = ggdaG ~I~S sI~&
9II :spaoo~H w~wG IW~O&
~ SH~X~ 900I (0 #H~X~) (]HODHH V~G ~
9C
9 ~ I 89 819E NH& 6
9 N~/& I 89 819E ~aS
9 I 89 8I~E ~DD 9
9 S~D I 89 819E NSS
9 I~VD I 89 8I~E HO
po~ SlD dK~ cL~ q~6ua~ sz~s
AaD AaD
I~ I~ I~ I~
s~u~ saIdm~s apoo IOO~ a~eN
:saAanD 6
& :GI g~dsp ade&
(99 #H~A~) GHODHH ~tUAHO& ~
~HSFI~ :
H~O~S H~HON :
AV~ HOHG~H~ :
(9I-II-0~-9~) 8I-8 :
NOI~tfHOq~XH ~ :
N/IOD
N&
ND
·
: (N~) &&oaN~&s UO0.T.
·
:(&&) MOGNIM 9NIZI~ON .gS%f8
:(3.&) MOGNIM PNIZI~]~ION ~0.~.
sa~q 900~
s~q ~9
· --spaooaa 68I
:q~buaI paooaa ~n~xeN
8 :aIT~qns
· spuo~as 96'~ = a~ uo~n~axa pasd~I~
· --spaooaa E 6 :aI~qns
IO
9E/L /96
IO
9~/L /~6
SI~ :adA~ s~ 6 aI~gns ad~
O..q. 8-18
CAI SSN LSN GR DEN CORR CN Sp GR1 AC RFO~ RILM RILD £FO£ fILM CILD
0
9~-8 'S'O
'03 Wf1330~£3d VM$¥qV O/HOS
'o£~
0 ~
O'O O'u 0'0 ~:
~-8 's'o
'03 ~flg30ai3d YNSV~V OiHOS
L'OG 'O£L~
~ 39~d
0 0__u 0 0 0'0 0'0 0'0 0'0 u'o 0'0 0'0 0'0 .17'.17£
0 0 U 0 0 0'0 0'0 0'0 0'0 U'O O'U 0'0 0'0 9'9'17
0'0 O'U 0'0 :'h
0'0 O*U 0'0 0'0 0 :,~
0 0_U 0 0 00~ 0 0 0 0 ~0 0 ~,U 0 0 O 0 0 0 0 6 9'17 0£
0'0 O*U 0'0 0'0 0'0 0'0 0'0 U*O O*O 0'0 0'0 ~*L~ *0~
o'o~ o-u 'o'o- ' 0'~ o*o o*o o*o u*o o*u o'o o*o ~*~ *o6oh
0'0 0'~ 0'0 0'0 0'0 0'0 0'0' U'O O'O 0'0 0'0 ]'Oh '0~0~
o'0 O'U 0'0 0'0 0'0 o*0 0'0 u'o O*U 0'0 0'0 h*~ *OEO~
0'0 O'U_ 0'0 0'0 0'0 0'0 0'0 u'o O'O 0'0 0'0 ]'Bh 'O]Oh
0'~
3/~ ~ ~ NI Aid
IdV Id~/ *id
*]dIO HIIM NFI~ SI 'i:~19
~ 'O£L~
O~Z~
°06 }'~
*0~9~
U 0 0 0'0 0'0 0'0 0'0 U'O O'U 0'0 0°0 £'~
0'0
U 0 0 0'0 0'0 0'0 0'0 U'O O'U 0'0 0'0 ~'0~ '06~
0'0 h'6~
NI AW
"'03 WfltqO~13d ViH~V'IV
'S'O
OIHOS
£
0 O'U O'O 0'0
0 0 u 0 0 0'0
0 0 0
0 0 0
0'0 U'O O'U
0'0 0'0 0'0 U'O O'U
e~
0 0 0'0 0'0 u'o O*U
0'0 0'0 0'0
0°0 0 ~b '0£1:~
0 0 0 0"0 u'U O*u 0'0 0'0 G'O~ '0£0~
0'0 1:'g£ '066~
9~-8
'03 W~]~O~13d V~SV~ OIHOS
9 39Vd
*03 W[1390B£3d V~SVgV 01HOS
0'0 0'~ 0'0 0'0 0'0 0'0 0'0 ,3'0
0 0 9 ~
0'0 O'U 0'0 ~
~-8 'S'O
'03 N['13qO~£]d VH$~qV OIHOS
~ ~gVd
0°0
0 0 0 0'0 0'0 U'O 0'0 0'0 0'0 6']i 'O£G~
0
0 0 0 0'0 0'0 U'O O'U 0'0 0'0 0'99
0'0 0'0 0'0 u'o O*O 0'0 0'0 G*~ '06b~
81: -El
0:3 WFl]]'lOSi3d '~)4S~'1~
OIHOS
6 39~d
i'0 O'U 0'0 0'0
0 0 u 0'0 0'0
0 O'u 0'0 0'0
0'0 0'0 u'o O'U 0 0 0 0 Z
0 l: il: 06! 2.
Oi L
. 0 0 0 U'O O*O 0'0 0'0 £'0C~ ' O£OZ.
0 0 0 0'0 0'0 u'o O*U 0'0 0'0 9'~ · Ol:OZ.
*03 ~n3qoal3a V~SVqV 01HOS
Ot 39¥d
0'0 g'°£~ °0/.,
'O~LL
,i
· o3 wn~3oai3a v~svnv 01HOS
0 0'0 0'0 0'0 0'0 u'o O'U 0'0 0'0 O'9g 'Oggb
O'O O'U 0'0 u
0 ~ :9 0
9~-f:l
*03 ~II3']OBlld ¥~S~/'1~ OJHOS
8~ 39Vd
0~t v
6'g6 'O£LW
,~ OLGU
£'8b 6'~ 0'66660'6666U'66660'66660'66666'~9 Z'~£ 'OGSV
0 0'0 0'0 U*O O'U
u 0 0 0 0 0'0 0'0 0'0 u'o O'U
· 03 I.tI13'10~iL3cl
's'o
~/>tS ¥"1~/ OIHOS
£L
121.
0 £
9Z £ 9 S'h~ ~'06 U*~ 8*e~ Z*6T T*h£ T'h£ '0606
9 £ O~T 9'£6 ~'6~ ~'~ T*~£ T'~ T'~ '0£06
ST 9'9 §*0~ 9'0~ l*L~ l'ih 0'0£ S'6] S*6T
9T'8 "S'O
*03 W[1330~12d ~HS~q~ OIHOS
TAPE
VERiIFICA?)ON
0.00000000
E-.~I
OI
r~jt
II II II II It
II II H tl It II
o0.o0o0ooo0o ~0oooo
Itl tt tl
~tl II I!