Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout182-013 • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 5cANNEDAUG 1 201 Mr. Jim Regg 0 � , 3 Alaska Oil and Gas Conservation Commission �1 333 West 7 Avenue a � Anchorage, Alaska 99501 pr-g-N.° Subject: Corrosion Inhibitor Treatments of GPB A -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad A that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, q / hg-- /C-(1) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) A -Pad Date: 04/15/2012 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal A -01A 2012420 50029201080100 1.3 _ NA 1.3 NA 11.10 7/21/2009 A -02 1710310 50029201090000 1.9 NA 1.9 NA 13.60 7/22/2009 A -03 1710380 50029201130000 0.5 NA 0.5 NA 5.10 7/21/2009 A -04 1720060 50029201150000 0.0 NA NA NA NA NA A -05A 2061280 50029201160100 0.0 NA NA NA NA NA A -06 1720180 50029201180000 0.8 NA 0.8 NA 6.80 7/21/2009 A -07 1730410 50029201310000 0.8 NA 0.8 NA 5.10 8/12/2009 A -08 1740040 50029201320000 No conductor NA NA NA NA NA A -09A 2001740 50029205520100 0.5 NA 0.5 NA 3.40 7/21/2009 A -10 1810300 50029205680000 14.0 NA 14.0 NA 103.70 7/22/2009 A -11 1810380 50029205750000 5.0 NA 5.0 NA 17.00 7/22/2009 A -12A 2071300 50029205150200 0.5 NA 0.5 NA 3.40 7/22/2009 A -13 1811590 50029206720000 0.3 NA 0.3 NA 2.55 4/15/2012 A -14 1810770 50029206050000 3.3 NA 3.3 NA 17.00 7/19/2009 A -15 1810780 50029206060000 0.5 NA 0.5 NA 3.40 7/19/2009 A -16A 1960980 50029205210100 0.3 NA 0.3 NA 1.70 7/19/2009 A -17A 2061250 50029205200100 0.3 NA 0.3 NA 2.60 7/19/2009 A -18 1921070 50029206300100 SC leak NA NA NA NA NA A -19 1811270 50029206480000 0.8 NA 0.8 NA 3.40 7/19/2009 .-4 A -20 1820130 50029207090000 0.8 NA 0.8 NA 5.10 7/20/2009 A -21 1820140 50029207100000 2.0 NA 2.0 NA 16.15 7/20/2009 A -22 1820180 50029207120000 Sealed conductor NA NA NA N/A NA A -23 1820240 50029207160000 0.3 NA 0.3 NA 3.40 7/20/2009 A -24 1820700 50029207430000 29.0 5.8 0.1 11/27/2009 1.70 3/18/2010 A -25A 2011480 50029207640100 0.3 NA 0.3 NA 1.70 8/13/2009 A -26L1 1971060 50029207946000 0.3 NA 0.3 NA 1.70 7/21/2009 A -27A 1982350 50029208090100 7.5 NA 7.5 NA 71.40 7/20/2009 A -28 1821500 50029208250000 2.5 NA 2.5 NA 20.40 7/20/2009 A -29 1821670 50029208410000 9.0 NA 9.0 NA 62.90 7/21/2009 A -30A 2040780 50029213720100 0.3 NA 0.3 NA 1.70 7/19/2009 A -31A 1990560 50029213830100 0.8 NA 0.8 NA 4.30 7/19/2009 A -32A 1990580 50029213950100 2.0 NA 2.0 NA 17.00 4/11/2012 A -33 1851830 50029214100000 0.8 _ NA 0.8 NA 3.40 8/12/2009 A -34A 1851050 50029213390100 4.4 NA 4.4 NA 28.90 7/22/2009 A -35 1850510 50029213130000 1.3 NA 1.3 NA 10.20 7/22/2009 A -37 1930070 50029223310000 0.0 NA NA NA N/A No treat A -38 1930320 500292234700 0.1 NA 0.1 NA 0.85 4/15/2012 A -39 1930280 500292234.40000 0.5 NA 0.5 NA 3.40 7/21/2009 A -40 1930140 50029223370000 0.5 NA 0.5 NA 3.40 7/22/2009 A -41 1941580 50029225300000 SC leak NA NA NA NA NA A -42A 2061300 50029225420100 0.6 NA 0.6 NA 5.10 7/20/2009 A -43 1960860 50029226770000 0.3 NA 0.3 NA 1.70 8/12/2009 A -44 2090410 50029234120000 1.5 NA 1.5 NA 8.50 6/24/2009 OPERABLE: Producer A -20 (PTD #1820130))stained IA Pressure Above MOASP • Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [AKDCWeIllntegrityCoordinator @bp.com] Sent: Saturday, November 05, 2011 10:47 AM efl , f (.7(1,‘ To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC; Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Tea° i Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: King, Whitney; Olson, Andrew Subject: OPERABLE: Producer A -20 (PTD #1820130) Sustained IA Pressure Above MOASP All, Producer A -20 (PTD #1820130) passed a TIFL on 11/05/2011 after the orifice gas lift valve was changed out. The passing TIFL confirms that tubing integrity is restored and the well is reclassified fo Operable. — Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWeIllntegrityCoordinator @BP.com 3 From: AK, D &C Well Integrity Coordinator Sent: Thursday, October 20, 2011 8:12 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); LeBaron, Michael J Subject: UNDER EVALUATION: Producer A -20 (PTD #1820130) Sustained IA Pressure Above MOASP All, Producer A -20 (PTD #1820130) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing /IA /OA equal to 1910/2060/10 psi on 10/18/2011. A TIFL failed on 10/19/2011. The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan forward: 1. Slickline: Change out orifice gas lift valve 2. DHD: Re -TIFL 3. WIE: If re -TIFL fails, evaluate dummying gas lift valves to MIT -IA A TIO plot and wellbore schematic have been included for reference. « File: A -20 (PTD #1820130) TIO Plot.doc » Please call if you have any questions or concerns. Thank you, Gerald Murphy (alt. Mehreen Vazir) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 11/7/2011 UNDER EVALUATION: Producer A -20 (PT• 820130) Sustained IA Pressure Abov1OASP Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator @bp.com] Sent: Thursday, October 20, 2011 8:12 PM n (z/i To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); AK, OPS GC3 &PCC OSM; AK, OPS GC3 Facility & Field OTL; AK, OPS GC3 Wellpad Lead; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Prod Controllers; Derrick, Laurie R Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); LeBaron, Michael J Subject: UNDER EVALUATION: Producer A -20 (PTD #1820130) Sustained IA Pressure Above MOASP Attachments: A -20 (PTD #1820130) TIO Plot.doc; A -20 (PTD #1820130) wellbore schematic.pdf All, Producer A -20 (PTD #1820130) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to 1910/2060/10 psi on 10/18/2011. A TIFL failed on 10/19/2011. The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan forward: 1. Slickline: Change out orifice gas lift valve 2. DHD: Re -TIFL 3. WIE: If re -TIFL fails, evaluate dummying gas lift valves to MIT -IA A TIO plot and wellbore schematic have been included for reference. «A -20 (PTD #1820130) TIO Plot.doc» «A -20 (PTD #1820130) wellbore schematic.pdf» Please call if you have any questions or concerns. Thank you, —5CP 6 70r5; Gerald Murphy (alt. Mehreen Vazir) ��', 6 Well Integrity Coordinator Ste' _ so,01-0 Af r� Office (907) 659 -5102 ts: 1 �' ` r �- Cell (907) 752 -0755 Pager (907) 659 -5100 Ext. 1154 11/2/2011 PBU A -20 PTD #1820130 10/20/2011 TIO Pressures Plot Well: A -20 4.000 - ?:000 - • __•__ Tbg —III--- IA 2.000 - —A-- OA OOA �.+* ■... rte ' — 00 OA On 11-/00 • - - � lum_- '' • A • 07/30/11 08/13/11 08/27/11 09/10/11 09/24/11 10/08/11 TREE = 4" CM/ SAFETY NOTES: WAR RADIO TRANSMITTER IN OFF A = McEVOY PAL a BEFORE WELL WORK INVOLVING EXPLOSIVES ACTUATOR= AXELSON ES CAN ACTU KB. ELEV = 76.98' BEGIN. CONTACT PAD OPER. KNUCKLE -UP TOOL BF. ELEV = 52.45' STRINGS BELOW 10000', CHECK PU WEIGHT EVERY 50' KOP = 1900' * ** 3-1/2" C HROM E TBG * ** Max Angle = 54 @ 6000' ' Datum MD = 11962' Datum TVDss= 8800' 1 2117' H3-1/2" HES X NIP, ID = 2.813" I GAS LIFT MANDRELS 13-3/8" CSG, 72 #, L -80, ID = 12.347" 1-1 2742' S T MD WD DEV TYPE VLV LATCH PORT DATE 5 3739 3406 49 MMG DOME RK 16 02/03/05 4 7226 5698 48 MMG DOME RK 16 02/03/05 3 9868 7355 47 MMG DOME RK 16 02/03/05 Minimum I ®= 2.75" 11421 2 11121 8255 44 MMG SO RK 22 02/03/05 *1 11326_8326 44 OTIS *DMY RA 0 N/A 3 1/2" OTIS X NIPPLE * NOTE: GLM BETWEEN PKR (04 /19105) - DO NOT USE I 11181' 1 I3 -1/2" HES X NIP, ID = 2.813" I 10 10 I 11203' H 9-5/8"x3-h12" BKR S -3 PERM PKR, ID = 3.875" I I 11261' H3-1/2" /2" HES X NIP, ID = 2.813" 1 3 -1/2" TBG, 9.3 #, 13CR -80, .0087 bpf, ID = 2.992" 1--I 11281' ' 11288' 1--1 5!8" X 3 -1/2" UNIQUE OVERSHOT Min 11346' - 13 -1/2" OTIS X NIP, ID = 2.75" I III 11 �, 11362' -ITBG SEAL ASSY 1 13 rig li,S1 11376' H 9 -5 /8" TM/ HBBP PKR, ID = 4.75" 1 I TOP OF 7" LNR 1—I 11409' i ir: 11421' 1-13-1/2" OTIS X NIP. ID = 2.75" I 3 -1/2" TBG, 9.3 #, L -80, .0087 bpf, ID = 2.992" H 11431' I 11431' 1-I TBG TAIL CUT OFF 1 1 11426' H ELMD TT - LOGGED 08 /30/90 I 9 -5/8" CSG, 47 #, L -80, ID = 8.681" H 11893' I PERFORATION SUMMARY REF LOG: SWS BHCS ON 03/10/82 12030' I-1 MARKER JOINT 1 ANGLE AT TOP PERF: 41?@ 12010' ' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn /Sqz DATE 12131' I— ITOPOF SAND (TAGGED 02812/05) I 5" 5 11881 - 11898 S 09/13/90 2 -1/2" 4 12010 - 12057 0 09/17/89 2-1/2" 4 12068 - 12072 0 09/17/90 12466' 1--1 26' 2 -1/8" D/A PERF GUN - 08/16/89 1 2 -1/8" 2 12072 -12080 S 09/13/90 2 -112" 4 12090 - 12128 0 09/17/90 12500' J-InW/ X NIP& CATCHER PLUG - 10/01/89 1 2 -1 /8" 2 12128 - 12131 S 09/13/90 - 2 -1/8" 2 12136 - 12154 S 09/13/90 12651' -1 FISH BP DEBRIS (RWO 07/03/89) I 2 -1/8" 2 12164 - 12173 S 06/19/89 1 12792' 1-118' SWS 2 -1/8" PERF GUN - 04/26/88 1 1 PBTD H 12651' 1 ,,,,,„....A. vim, R V T v T 4 1 7" LNR, 26 #, L -80, .0383 bpf, ID = 6.276" 1--I 13034 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/11/82 ORIGINAL COMPLETION 02/03/05 KSB/TLH GLV C/O WELL: A -20 07/05/89 RWO 06/16/05 LJL /PJC CORRECTION TOS /PERF PERMIT No: Y 1820130 07/31/91 LAST WORKOVER 07/25/09 NHIPJC DRILLED FASDRILL (02/07/05) API No: 50 -029- 20709 -00 01/19/05 WRR/TLH RWO 07/25/09 NHIPJC TAG SAND @ 12131' (02/12/05) SEC 35, T11 N, R13E 08/26/03 KSB /KK SAND DUMP 01/01/05 JRA/TLH FASDRILL PLUG SET BP Exploration (Alaska) 07/20/09 ~~~~U~~~~ `a~"ri'l~b l4 il r (''~ tlt:~Di"~1.`~l"~9 ,.S ~I,j;,i~'i '~ .. , ~ _, . , w. Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 40o Alaska Oil & Gas Cons Comen Anchorage, AK 99503-2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Sui4e 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 4-04A/T-30 AYTO-00023 PRODUCTION PROFILE O6/30/09 1 1 L3-31 AXBD-00030 MEM INJECTION PROFILE - / 07/01/09 1 1 G-31 B ANHY-00100 LDL ( 07/07/09 1 1 Z-32BL1 AV1H-00018 SBHP RVEY 07/02/09 1 1 14-10 AY3J-00033 PRODUCTION PROFIIE ~'$(~, 07/01/09 1 9 A-20 AV1H-00021 SBHP SURVEY - '~ 07/07/09 1 9 01-30 AY3J-00034 lDL {0 07/OM09 1 1 M-26A BOCV-00021 PRODU TION LOG 07/12/09 1 1 06-23C AXBD-00031 MEMORY PROD PROFILE - 07/03/09 1 1 L3-31 BOCV-00019 PRODUCTION LOG 07/09/09 1 1 L2-20 AYKP-00031 LDL - 07/10/09 1 1 E-09B 604C-00064 SCMT 07/01/09 1 1 04-33 AY3J-00036 USIT ( ~ 07/07/09 1 9 WGI-07 BOCV-00020 USIT 07/11/09 1 1 1-31/M-21 B146-00063 PRODUCTION PROFIL~ ~ - O6/16/09 1 1 L3-02 AZCM-00028 RST ' O6/15/09 1 1 1-31/M-21 B14B-00063 RST ~ pg/~7/pg ~ 1 18-18B ANHY-00097 RST 'a - 06/09/09 1 1 o~ reo~ nnvu~un ~r~nr nr nr~~~r e~ ' __"__ "_""'~'"~~~~.~ "~~~.. . ~. ~.~.........-.......~..........~.. v..~ vvr ~ ~~v~~ ~v. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. ~- r, )I -/ t_..) Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ~ ~ .t>¡ '\ STATE OF ALASKA '\ ALASKA ,-.t AND GAS CONSERVATION COII,..41ISSION R REPORT OF SUNDRY WELL OPERATIONS '" B FE 1. Operations Performed: 0 Abandon 0 Alter Casing 0 Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 047472 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Length Perforation Depth MD (ft): Perforation Depth TVD (ft): 1 4 2005 aD Repair Well 0 Plug Perforations 0 Stimulate 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well 0 Ot'Mf~;homge 0 Time Extension 4. Current Well Class: aD Development 0 Exploratory 0 Stratigraphic 0 Service 5. Permit To Drill Number: 182-013 6. API Number: 50-029-20709-00-00 99519-6612 77' 9. Well Name and Number: PBU A-20 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool 13034 9571 12131 9004 feet feet Plugs (measured) 12131 feet Junk (measured) 12466 feet Size MD TVD Burst Collapse 2011 x 30" 110' 1101 13-3/8" 2745' 26851 5380 2670 9-5/8" 11893' 8824' 6870 4760 7" 11409' - 13034' 8462' - 9571' 7240 5410 SCANNED FEB 1 5 2n05 110' 2745' 11893' 1625' 12010' - 12128' 8913' - 9002' 3-1/2",9.3# 13Cr80 / L-80 11431' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 3-1/2" 'S-3' packer; 9-5/8" TIW 'HBBP' packer; HES 'X' Nipple 11203'; 11376'; 2117' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and tinal pressure: R8DAfs 8Ft FEB 1 4 2005 Representative Daily Average Production or Injection Data Gas-Mct Water-Bbl Casino Pressure 996 474 1 ,832 972 15. Well Class after proposed work: 0 Exploratory aD Development 0 Service 16. Well Status after proposed work: aD Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: Contact Nick Miller, 564-4746 N/A Oil-Bbl Prior to well operation: 329 Subsequent to operation: 534 14. Attachments: 0 Copies of Logs and Surveys run aD Daily Report of Well Operations aD Well Schematic Diagram 13. Printed Name Terrie Hubble Signature ~ìt bt~ Form 10-404 Revised 04/2004 TubinQ Pressure 1500 300 Title Technical Assistant ÓhRe I G f1\rÄt Date O;¿/,Lllos Prepared By Name/Number: Terrie Hubble, 564-4628 Submit Original Only ) ) Well: Field: API: Permit: A-20 RWO Prudhoe Bay Unit 50-029-20709-00-00 182-013 Accept: Spud: Release: Rig: 01/13/05 N/A 01/19/05 Nabors 4ES PRE-RIG WORK 08/25/03 RIH W/2.25" OD NZL AND COULD NOT PASS GLM #5 AT 6837' CTMD. POOH, INSPECT NZL SHOWS SMALL DENTS, DINGS WHICH COULD BE FROM TOP OF GLV LATCH. MU DOUBLE STINGERS AND 2.25" OD NZL AND RIH. TAG TD AT 12,084' CTMD, LAY IN 5000' 20/40 RIVER SAND. 08/26/03 RIH TO TAG SAND TOP AFTER PUMPING THE FIRST BATCH OF SAND AT 11,934' CTMD. (GAINED 150'). LAY IN 4000# 20/40 RIVER SAND. TAGGED AT 11,777' CTMD. LAY IN 1150# 20/40 RIVER SAND & 250# SLUGGETS. DRY TAG AT 11,724' CTMD. PRESSURE TEST TO 950 PSI FOR 30 MINUTES. LOST 45 PSI/29 PSI FOR 30 MINUTE TEST. (VERY SPUNGY PRESSURING UP, APPEARS TO BE A FAIR AMOUNT OF GAS IN THE IA). RETAG AT 11,732' CTMD. POOH. RIG DOWN. WELL FREEZE PROTECTED TO 2500' WITH 50/50 METH. JOB COMPLETE. 11/23/04 RAN 2.50 CENT AND SAMPLE BAILER SAT DOWN AT 5044' SLM. WORKED DOWN TO 5072 SLM. 11/26/04 LRS PUMP COLD FLUID. DRIFT TBG WI 2.50 CENT + 1.5 SAMPLE BAILER. TAG FILL AT 11683' SLM. 12/31/04 RAN 2.70" DRIFT TO 11,460' SLM. NOTE: FOUND TIGHT SPOTS AT 8966' SLM & 11,343' SLM. LRS PUMPED 70 BBL OF WATER, 3 BBL METH AND 22 BBL OF DIESEL. TIIIO = 850/66010 ASSIST SLICK LINE, HOT OIL TUBING. PUMPED 73 BBLS DIESEL AT 1800 TO BRUSH & FLUSH TBG. PUMP AN ADDITIONAL 9 BBLS OF METHONAL, 58 BBLS OF SEAWATER, AND 22 BBLS OF DIESEL TO ATTEMPT TO WORK TOOL STRING DOWN HOLE. 01/01/05 SET HALLIBURTON 3-1/2 FASDRILL BRIDGE PLUG MID-ELEMENT SET AT 11410'. PT PLUG TO 3500 - HELD PRESSURE (NOTE: FAILED CMIT PERFORMED ON 1/3/05). SHOT STRING SHOT AT 11289'-11301'. PUNCHED TUBING AT 11276'-11278'. CUT TUBING AT 11300'. ) ) .BPEXPLORATION. 9p~.r~~.i..qnØ....$..ørn...rn:~.ty...."~pqrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-20 A-20 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 1/12/2005 Rig Release: 1/19/2005 Rig Number: Spud Date: 2/8/1982 End: 1/19/2005 Hdürs Täšk Code NPT [)éSCriþtiörl.öfQþér$tidns 1/12/2005 10:00 - 00:00 14.00 MOB N PRE 1/13/2005 00:00 - 02:00 2.00 MOB N PRE 02:00 - 06:00 4.00 MOB P PRE 06:00 - 16:00 10.00 MOB P PRE 16:00 - 18:00 2.00 KILL P DECOMP 18:00 - 19:00 1.00 KILL P DECOMP 19:00 - 19:30 0.50 KILL P DECOMP 19:30 - 23:30 4.00 KILL P DECOMP 23:30 - 00:00 0.50 KILL P DECOMP 1/1412005 00:00 - 06:00 6.00 WHSUR P DECOMP 06:00 - 08:30 2.50 BOPSUR P DECOMP 08:30 - 12:30 4.00 BOPSUP P DECOMP 12:30 - 13:30 1.00 BOPSUR P DECOMP 13:30 - 14:30 1.00 PULL P DECOMP 14:30 - 15:00 0.50 PULL P DECOMP 15:00 - 17:30 2.50 PULL P DECOMP 1/15/2005 17:30 - 18:00 18:00 - 00:00 00:00 - 06:30 0.50 PULL P 6.00 PULL P 6.50 PULL P DECOMP DECOMP DECOMP 1/16/2005 06:30 - 08:00 08:00 - 13:00 13:00 - 14:30 14:30 - 00:00 00:00 - 01 :00 01 :00 - 02:30 1.50 PULL P 5.00 CLEAN P 1.50 CLEAN P 9.50 CLEAN P 1.00 CLEAN P 1.50 CLEAN P DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP Rig on stand by while waiting for wellhouse to come off & pad to be prepped in the way of snow removal, due to recent blizzard. Rig on stand by while waiting for well house to come off & pad to be prepped in the way of snow removal, due to recent blizzard. PJSM. Scope down & lower derrick. Rig down rig components. Begin moving rig to A-20. Move over to & rig up on A-20. Waited (4) hours for well flowlines to be freeze protected. Accepted rig @ 12:00 hrs, 01/13/2005. Take on 120F seawater to pits. R/U and test lines for well circulation operations. P/U Lubricator and pull BPV. PJSM wI crew, Tour Pusher, and Co-Man to discuss well kill operations. Ensure lines are clear. Open well. Tubing and casing 0 psi. Circulate 120 F seawater 3-4 BPM @ 20 psi to 400 psi. Clean returns after full well bore circulation of 800 Bbls. Casing and tubing on slight vacuum. Blow down line to Tiger Tank. Bleed lines to tree. P/U and install TWC. NID Tree. Wait on Bleed Trailer to bleed pressure off OA. Bled 1650 psi to 0 psi in 20 minutes. N/U BOPE. PJSM. Conduct full BOPE test. Witnessing of test waived by AOGCC inspector Chuck Scheve. Conduct drawdown test. No failures. PJSM. P/U lubricator, pull two way check valve, lay down lubricator. PJSM. P/U landing joint & screw into hanger. BOLDs. PJSM. Pull hanger to floor. Broke free @ 85K, up wt 83K. (50) bbls to fill hole. R/U Control Line Spooler and TOOH, UD 3-1/2" tubing ang spool control lines. Recovered 25 whole clamps, 5 partial clamps, and 2 SS bands. Original RIH: 31 Clamps and 4 SS bands. Recovered full control line assembly. RID Control Line spooler, clear Rig Floor. Resume TOOH and UD 3-1/2" tubing, numbering each joint. TOOH and UD 3-1/2" tubing. Corrosion holes found in joints starting with #233 or 7,324' MD. #348 thru #353 were bent and lor cork screwed. Cut was uneven & jagged & needs dressing. Recovered 18.04' of jt # 354. 00 of cut off jt just below cut area = 3.53". Recovered (4) control line rubbers out of drip pan & (1) partial, along with (2) pins. Total fluid lost to hole during trip out = 85 bbls. Clear I clean rig floor. Install wear bushing. PJSM. Rack & tally 31/2" DP. PJSM. Pick up tubing stub dress off BHA. Fill hole, (30) bbls. PJSM. RIH wI BHA #1, picking up DP 1 x 1. Finish RIH wI BHA #1 on DP from Pipe Shed to joint #346. P/U and M/U Kelly, tag tubing stump @ -11,286'. Get Parameters: P/U wt 160K, S/O wt 115K. Wash down, swallow Printed: 1/24/2005 10:23:21 AM ) ) BP.EXPLORATION ØPê~atiøms...St.ltr'll"r'Î~rYf'Ê!pørt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: A-20 A-20 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 1/12/2005 Rig Release: 1/19/2005 Rig Number: Spud. Date: 2/8/1982 End: 1/19/2005 Hdurs Tâsk Còdê NPT Phase 1/16/2005 01 :00 - 02:30 1.50 CLEAN P DECOMP 6' and mill 2' to 11,288'. Stop rotating and pumping, P/U 15' and slowly RIH to dry tag for Top of tubing Stub. Verified twice to be @ 11,288'. 02:30 - 07:00 4.50 CLEAN P DECOMP Build Hi-Vis sweep and circulate well bore clean, 5 BPM @ 1100 psi. 07:00 - 11 :00 4.00 CLEAN P DECOMP PJSM. POOH w/3 1/2" DP. 11 :00 - 12:00 1.00 CLEAN P DECOMP PJSM. UD tbg stub dress off BHA. Good indication of stub dressed off. 12:00 - 12:30 0.50 CLEAN P DECOMP PJSM. P/U Halliburton RTTS & (9) 6 1/4" DCs. 12:30 - 14:30 2.00 CLEAN P DECOMP PJSM. RIH wI RTTS on 31/2" DP. 14:30 - 15:30 1.00 CLEAN P DECOMP PJSM. Slip & cut drilling line. 15:30 - 17:30 2.00 CLEAN P DECOMP RIH w/31/2" DP. 347 jts. Up wt 151K, down wt 115K. 17:30 - 18:00 0.50 CLEAN P DECOMP PJSM. M/U head pin & reverse circulate to fluid pack DP. Turn around & circulate the long way to fluid pack the back side. Set RTTS @ 11270' DPM. 18:00 - 19:30 1.50 CLEAN P DECOMP Build pressure to 3500+ psi for CMIT. Hold and record for 30 minutes. Pressure dropped to 3400 psi and held rock steady for last 25 minutes of test. 19:30 - 00:00 4.50 CLEAN P DECOMP Unseat RTTS packer; POOH and UD 3-1/2" DP. 1/17/2005 00:00 - 05:30 5.50 CLEAN P DECOMP POH and UD 3-1/2" DP. 05:30 - 06:30 1.00 CLEAN P DECOMP Break-out and UD 9-DCs and Halliburton RTTS running tool and RTTS packer. 06:30 - 13:30 7.00 RUNCOIVP RUNCMP PJSM. Load, strap & drift 31/2" Yam Top & 31/2" Yam Ace tubing. Rig up torque turn. 13:30 - 00:00 1 0.50 RUNCOrvP RUNCMP PJSM. Make up Unique Overshot. Pinned wI (4) brass shear pins to shear @ 15K. RIH wI completion equipment & 31/2", 9.3#, 13cr Yam Ace tubing, torquing each connection to 3200 ft-Ibs. 1/18/2005 00:00 - 01 :30 1.50 RUNCOIVP RUNCMP Continue RIH wI completion equipment and 31/2",9.3#, 13cr Yam Ace tubing, torquing each connection to 3200 ft-Ibs. 01 :30 - 02:30 1.00 RUNCOrvP RUNCMP M/U and RIH from Pipe Shed GLM #4,3 remaining jts 3-1/2" Yam Ace, and Yam Ace to Yam Top XO. 02:30 - 07:30 5.00 RUNCOrvP RUNCMP P/U and RIH 3-1/2" VamTop tubing, torquing each connection to 2900 ft-Ibs. 07:30 - 09:30 2.00 RUNCOrvP RUNCMP PJSM. M/U headpin on jt #366, (354th jt in hole). 86K up wt, 63K down wt. Bring on pump @ 2 bpm 1200 psi. Slack off and take weight 2' in on # 366. Set down and observe shear pins sheared w/1 OK setting down on stub. Continue to slack off and start taking wt 8 1/2 - 9' in. Stack 1 0-15K on stub to verify stacked out, (no pressure increase observed). Shut down pump. Lay down jt # 366, 365 and 364. M/U space out pups, 3.82' and 7.82'. M/U jt # 364. Total jts run = 352 = 236 Yam-Ace + 116 Yam-Top. Laid down 12 Yam Ace while RIH, (#238 -249). M/U tubing hanger. 09:30 - 15:00 5.50 RUNCOIVP RUNCMP PJSM. Line up & reverse circulate 125 degree seawater @ 3 bpm 1300 psi, (290) bbls, followed by 580 bbls 125 degree seawater wI corrosion inhibitor @ 3 bpm I 300 psi. 15:00 - 19:00 4.00 RUNCOrvP RUNCMP P/U wt 85K, SIO wt 62K. Land hanger, drop Ball/Rod to set Packer, RILDS, UD landing joint. Bring tbg up to 3500 psi, hold and record for 30 mins. Bleed tbg to 1500 psi; pressure Annulus to 3500 psi; bleed off tbg and shear OCR valve--indicated valve sheared @ - 2500 psi. Pump 3 BPM @ 310 psi, both ways. Printed: 1/24/2005 10:23:21 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Dåte ) ) BP.EXPLOBATION ()pe.r.¡)ti.ø..,~......$~..tr8..rtå.~.rY........~.E!.p()rt A-20 A-20 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 1/12/2005 Rig Release: 1/19/2005 Rig Number: Spud Date: 2/8/1982 End: 1/19/2005 FrÖrn~Tö ¡Yours Täsk - Code NPT 1/18/2005 19:00 - 22:00 22:00 - 00:00 00:00 - 02:00 02:00 - 03:00 1/19/2005 03:00 - 04:00 04:00 - 05:00 05:00 - 06:00 3.00 BOPSUP P 2.00 WHSUR P 2.00 WHSUR P 1.00 WHSUR P RUNCMP RUNCMP RUNCMP RUNCMP 1.00 WHSUR P RUNCMP 1.00 WHSUR P 1.00 WHSUR P RUNCMP RUNCMP P/U, set and test TWC. N/D BOPE. N/U adaptor flange and tree. Test Adaptor Flange and Tree to 5,000 psi. P/U lubricator, pull TWC. R/U Hot Oil to freeze protect well with 150 Bbls diesel. PT hot oil lines. Hold PJSM wI Hot Oil, rig personnel. Rig up Little Red and test lines, OK. Pump 150 bbl PJSM. Allow diesel to U-Tube from IIA to tubing. Bleed Down hot oil lines, RID Hot Oil. Release rig @ 0600. Printed: 1/24/2005 10:23:21 AM ) ) Well: Field: API: Permit: A-20 RWO Prudhoe Bay Unit 50-029-20709-00-00 182-013 Accept: Spud: Release: Rig: 01/13/05 N/A 01/19/05 Nabors 4ES POST RIG WORK 01/25/05 PULL BPV FOR SIL. 02102105 PULL B&R FROM 11,243 SLM. RIH W 13.5 OM-1, 1 5/8 JDS. 02103/05 PULLED DMY GLV'S FROM STA# 1, STA# 2, STA# 3, STA# 4. SET FULL GL DESIGN BACK. PULL RHC PLUG BODY AT 11 ,256' SLM. RDMO. 02107/05 MIRU WI 1.75" 16CR CT. MUIRIH WI BAKER MOTOR & 2.70" 5-BLADED JUNK MILL. HARD MILLING AT 11374' CTMD (POSSIBLY FASDRILL PLUG OR RIG TREATS). BROKE THROUGH AFTER 4 STALLS. RIH MILLING WI FLO-PRO FROM 11698' TO 11714' CTMD TO BREAK UP CRUST ON TOP OF SLUGGITS. CHASE OUT OF HOLE. FREEZE PROTECT COIL AND TUBING. SHUT DOWN FOR THE NIGHT. WELL LEFT SHUT IN AND PAD OPERATOR NOTIFIED OF STATUS. 02110/05 BOP TEST. RIH WI 1.75" JSN. TAG SAND AT 11707'. FCO TO 11960' WI FLOPRO SWEEPS, PUMP 2X BTMS UP TBG VOLUME. POOH. UNLOAD WELL WI GL OVERNIGHT, WILL RETURN TOMORROW TO FCO WI GL TO GC3. 02111/05 RIH WI 1.75" JSN. TAG SAND AT 12044'. PUH TO START JETTING BUT KEEP SETTING DOWN ABOVE SAND, 11994' - 12019', POOH. MUIRIH WI MTR & 2.69" JUNK MILL. TAG 12020', MILL WI FLOPRO SWEEPS TO 12131'. ENCOUNTER EITHER FISH OR DIFF STICKING WHILE MILLING. POOH AT 80%. WELL LEFT FLOWING. COMPLETE RDMO. TREE = ,I t 4" CrN WELLHEAD= McEVOY 7;'cT'üÃfõR";--Ã"XELSÕN KB~äE\Ï';'. ' ., ..76.98; 'SF:"ElBi; ,..,.' ." ""'s'i45' kop;' '" "''1'9ÔO' 'Max Angíë '';' . 54 @Ë,öoo' ÖatumMD='" . , "'11962' Diitüm T\ibSs;. .'8'800' ') 113-3/8" CSG, 72#, L-80, ID = 12.347" I, 2742' ~ Minimum ID = 2.75" @ 11421' 3 1/2" OTIS X NIPPLE 13-1/2" TBG, 9.3#, 13CR.80, .0087 bpf, ID = 2.992" l-f 11281' I I TOP OF 7" LNR l-f 11409' I 13-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" l-f 11431'1 A-20 . . L Jt I~ä 19-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 11893' ~ ÆRFORA TION SUMrvtA RY REF LOG: SWS BHCS ON 03/10/82 ANGLEATTOPÆRF: 40 @ 11881' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 5" 5 11881 - 11898 S 09/13/90 2-1/2" 4 12010 - 12057 C 09/17/89 2-1/2" 4 12068 - 12072 C 09/17/90 2-1/8" 2 12072 - 12080 S 09/13/90 2-1/2" 4 12090 - 12128 C 09/17/90 2-1/8" 2 12128 - 12131 S 09/13/90 2-1/8" 2 12136 - 12154 S 09/13/90 2-1/8" 2 12164 - 12173 S 06/19/89 I PBTD Ii 12651' 17" LNR, 26#, L-80, .0383 bpf, ID = 6.276" l-f 13034' DA TE REV BY COMMENTS 03/11/82 ORIGINAL COMPLETION 07/05/89 R'NO 07/31/91 LAST WORKOVER 01119/05 WRR/TLH R'NO 08/26/03 KSB/KK SAND DUMP 01/01/05 JRA/TLH FASDRILL PLUG SET SAFE"Y:>TES: WARNING: RADIO TRANSM ITTER IN WEA T I ...l MONITORING SHACK MUST BE TURNED OFF BEFORE ANY WELL WORK INVOLVING EXPLOSIVES CAN BEGIN. CONTACT PAD OPER. KNUCKLE.UP TOOL STRINGS BELOW 10000', CHECK PU W8GHT EVERY 50' *** 3-112" CHROM E TBG *** I 11181' I 11203' I 11261' 1 11288' I 11346' I I I I I I I' 11362' 11376' 11410' 11421 ' 11431' 11426' ~ ~ 732' ~ ~ I 1-f3-1/2" HES X NIP, 10 = 2.813" I l-f 9-5/8" X 3-1/2" BKR S-3 ÆRM PKR, ID = 3.875" I 1-f3-1I2" HES X NIP, 10 = 2.813" I Ii 9-5/8" X 3-1/2" UNIQUE OV ERSHOT I 1-13-1/2" OTIS X NIP, ID = 2.75" I liTBG SEAL ASSY 1 l-f 9-5/8" TrN HBBP PKR, ID = 4.75" I 1-1 ~-1/2" H:::€ F^SDrULL rLUG (0 I/O I/OG) I~~o.. 1-;3-1/2" OTIS X NIP, ID = 2.75" I I-fTBG TAIL CUT OFF I 1-1 ELMD TT - LOGGED 08/30/90 I I ITOP or 3AMD 1 ~ 1 12030' l-f rvtARKER JOINT I ~ I)..\~\' ~\emed 0\A.:k ~TOÇ>~ ~ I ~ 12466' 1-126' 2-1/8" DlA ÆRF GUN - 08/16/89 I ~v J 12500' I-fTlW/XNIP&CATCHERPLUG-10/01/89 1 112651' I-fBAKERBP-07/03/89-RWol I 1 12792' l-f 18' SWS 2-1/8" ÆRF GUN - 04/26/88 I ~ I 2117' 1-;3-1/2" HES X NIP, ID = 2.813" 1 .. GAS LIFT rvtANDRELS . ST MD 1VD DEV TYÆ VLV LATCH PORT DATE 5 3739 3406 49 MMG DOME RK 16 02/03/05 4 7226 5698 48 MMG DOME RK 16 02/03/05 3 9868 7355 47 MMG DOME RK 16 02/03/05 2 11121 8255 44 MMG SO RK 22 02/03/05 NOTE: GLM BETWEEN PKRS (1/19/05 RWO) - DO NOT USE 1 1113261 83261 44 1 OTIS 1 DMY 1 RA 1 0 1 N/A DA TE REV BY COMMENTS 02/03/05 KSB/TLH GL V C/O PRUDHOE BA Y UNrr WELL: A-20 ÆRMrr No: 1820130 API No: 50-029-20709-00 SEC35, T11N, R13E BP Exploration (Alaska) 03/18~03 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth NO. 2702 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay, Endicott Color Well Job # Log Description Date Blueline Prints CD A-20 I ~/<:~ 'O1,..~ GLS 03105103 1 PWDW2-'I 'j -7 ~"L"'){/~ ~ LDL 02/07/03 V-03 ,c~-c:~ 1 5 STATIC SURVEY/TEMPIPRESS 03/03103 1-51/V-20 ! C~;~ _ I I ~ INJECTION PROFILE 03107/03 '1 R-14A ~- ~ 23086 LDWG EDIT ARC RESISTIVITY DATA 11144/02 R-14A 23086 MD VISION RESISTIVITY 41111/02 R-14A 23086 TVD VISION RESISTIVITY 1111~102 1 R-44A ,,,~ 23086 MD VISION RESlSTIVITY(BHP) ~1/41/02 , , , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 REcE~VE~'~ Date Delivered: Ata~b~ O~ & Gas Cons. Cernmi~ion Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'I-FN: Beth Receiv~~_-_~. ~~-~ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 August 1995 RE: Transmittal of Data Sent by: ANCH. EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION A-20 Y-11 ~ ~ U-14 (11-20-11-13) M-08 1 PLS FINAL BL+RF 1 CCL FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS/STP FINAL BL+RF ECC No. Run # 1 3867.02 Run # 1 5157.08 Run # 1 6014.03 Run # 1 6156.01 Please sign and return to: Attn. Rodney D. Paulson ' age, AK 99518 / ~ Or FAX to (907) 563-7803 Received byX~,~/ ~/~/~ Date: STATE OF ALASKA At KA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Stimulate x Plugging Repair well 5. Type of Well: Development Exploratory Stratlgraphic 1. Operations performed: Operation shutdown__ Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2078' NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM At top of productive interval 1074' NSL, 1490' EWL, Sec. 01, TION, R13E, UPM At effective depth 466' NSL, 1753' EWL, Sec. 01, TION, R13E, UPM At total depth 291' NSL, 1851' EWL, Sec. 01, TION, R13E, UPM 12. Present well condition summary Total depth: measured 13034feet true vertical BKB 9570feet Plugs (measured) Perforate Other 6. Datum elevation (DF or KB) KBE = 76.98 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-20 PBU 9. Permit number/approval number 82-13/90-530, 90-752 10. APl number 50- O29-2O7O2 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 12792feet true vertical BKB 9435feet Junk (measured) top of perf gun fish @ 12792' Casing Length Structural .. Conductor 110 Surface 2720 Intermediate 11868 Production -- Liner 1625 Perforation depth: measured Size Cemented Measured depth 8 c.y. 135 3720 c.f. 2745 1711 c.f. 11893 20x30 13 3/8 9 5/8 7 630 c.f. 11881'-11898' (Sag R) 12010'.12057', 12068'.12072', 12090'-12128' 11409.13034 true vertical subsea 8738'. 8751' (Sag R) 8836'.8925' (three Ivishak intervals) Tubing (size, grade, and measured depth) 3 1/2" L-80 to 11421' with 2 7/8" tailpipe to 11431' True vertical depth BKB 139 2685 8824 8462-9570 Sqzd: 12072-80 12136-54, Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 11893'; 3 1/2" SSSV at 1989' 13. Stimulation or cement squeeze summary Intervals treated (measured) see attachment 14. Treatment description including volumes used and final pressure A~aska 0il & G~s Cons. 'Anchorage Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys 'run Daily Report of Well Operations' X 580/' 510 211 .. 2620 / 3885 1519 .' 16. Status of well classification as: Oil X Gas Suspended 956 255 0 301 Service 17. I hereby ce~rtify that the foregoing is true and correct to the best of my knowledge. Signed ~ /~C,~~ Title Supervisor Waterflood/MiscibleFlood Form 10404 Rev 06/1~/88 ~' Date I//'~, b/ SUBMIT IN DUPLICATE 8/14/90 9/12/90 9/13/90 9/14/90 9/17/90 10/11/90 CTU Well A-20 (24-01-10-13) PBU CEMENT SQUEEZE/REPERF/FRAC OPERATIONS Performed a 15% HCI perforation wash. Rigged up coiled tubing unit and performed cement squeeze of all perforations; squeeze broke down. Resqueezed perforations. Performed inflow test, okay. Reperforated the following intervals using Halliburton 2 1/2" carrier guns at 4 spf: 12010' - 12057' MD BKB 12068' - 12072' MD BKB 12090' - 12128' MD BKB Returned well to production. Pedormed hydraulic fracture of the above Ivishak perforations. Returned well to production and tested. jam 1/14/91 RECEIVED JAN 1 8 t991 Alaslm 0il & Bas cons. Commissio[~ :Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (9O7) 561-5111 TO: DISTRIBUTION Date :11121190 T#:81848 FROM: SUBJECT: Information Control Well Records LR2-1 BP (~ASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-20 Perf 09/17/90 #1 11300-12150 HRS 5" X-12 Temp 1 0/01/90 #1 8900-9350 HLS 5" Distribution: ARCO CHEVRON EXXON GEOSCiENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED NOV 2 8 1990 Alaska Oil & ~as Cons. Commission AnChorage BP EXPLORATION A,qchor~.@e BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :09/14/90 T#:81649 FROM: SUBJECT: IRformation Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-20 PROD-F 08/30/90 #1 11300-12350 Camco 5" A-20 Jewelry Log 08/30/90 #1 11300-12300 Camco 5" A-30 PITS 08/29/90 #1 11090-11100 Camco 5" E-10 Prod-F 09/01/90 #1 11350-11700 Camco 5" S-24 P rod- F 09/02/90 #1 9800-10175 Camco 5" W-17 PITS 08/31/90 #1 11550-11810 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESE~R--------~ ~.ATE OF ALA~ ARCHIVES · f .. · .A OIL AND GAS CONSERVATION COMMIS~ .4~,~. APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend __ Alter casing ~ Repair well Change approved program 2. Name of Operator BP Exploration (Alaska) In= 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Operation Shutdown Re-enter suspended well Plugging Time extension ~ SlJmulate ~ Pull tubing . Variance Pedorate X Other X 6. Datum elevation (DF or KB) KBE- 76.98 AMSL feet 5. Type of Well: Development I::xploral~/ Sltaligraphic Service 4. Location of well at surface 2078' NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM At top of productive interval 1074' NSL, 1490°EWL, Sec. 01, TION, R13E, UPM At effective depth 4015' NSL, 3866' EWL, Sec. 01, TION, R13E, UMI At total depth 291'NS1., 1851' EWL, Sec. 01, TION, R13E, UPM 12. Present well condition summary Total depth: measured 13034 feet true vertical BKB 9570 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-20 (24-01-10-13) PBU 9. Permit number 82-13 10. APl number 50- 029-20702 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 11571 feet true vertical BKB 8581 feet Junk (measured) top of per/gun fish @ 12792' Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20x30 8 c.y. 135 139 Sudace 2720 13 3/8 3720 c.f. 2745 2685 Intermediate 11868 9 5/8 1711 c.f. 11893 8824 Production -- Liner 1625 7 630 c.f. 11409-13034 8462-9570 Perforation depth: measured 11881'-11898' (Sag R) 12010'-12053', 12070'-12080', 12090'-12131', 12136'-12154' Sqzd: 12164'-12173'(lvishak) RECEIVED true vertical subse a 8738'- 8751'(Sag R) 8836'.8958' (five Ivishak intervals) Tubing (size, grade, and measured depth) 3 1/2" L-80 to 11421' with 2 7/8"taiip~oe to 11431' Packers and SSSV (type and measured depth) 13. Attachments ,;:ilaska OJJ & ~as Cons. (,omm[s,~:~.?' ' ,.'"' 9 5/8" BOTpacker at 11893'; 3 1/2" SSSV at 1989' Description summary of proposal X Detailed operations program ~ BOP'~k~6{~dh~ X 14. Estimated date for commencing operation September 1990 16. If proposal was verbally approved Name of approver Blair Wondzeli g/6/go I Oil Date approved Service 15. Status of well classification as: Gas ~ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned T~le Supervisor Watediood/Miscible Flood FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance Mechanical Integrity Test~ Subsequent form required 10- Date ~/~o i o.rova'"o9 Approved by order of the commission Form 10-403 Rev 06/15/88 ORiG;;,;AL ,.,,,,,,-nav ~,~i Ul t ~i~ ~ · LONNIE C. SMITH Appro?~ _C.,q~mmissioner Date t~l//e/q0 m, ,~,., SUBMIT IN TRIPLICATE WELL A-20 NRW~O ~TATE SUNDRY A coiled tubing cement squeeze of existing perforations is proposed as follows: 1) Rig up CTU and support equipment and pressure test BOP's to 4000 psi. 2) Pump cement and squeeze existing channel from 12154' - 12180' MDBKB to reduce water production. 3) Reverse out cement after squeeze is obtained. Wait 12 hours, then test squeeze by performing inflow test. If squeeze fails, immediately resqueeze. 4) If squeeze is successful, perforate the following intervals: 12010'-12057' MDBKB 12068'-12072' MDBKB 12090'-12128' MDBKB 5) Return well to production. RECEIVED a ]9,90 CLL 9/5/9O BOWEN PA('' '(OFF GREASE SEAL FLOWTUBE GREASE LINE RISER . · , BOP..._ ,'- . GREASE RESERVOIR '..' ' ·" .: _'.'v- .=-. ' : L :..~ ' .' . ·--'~ '-'.~- -'"~""' "' -- ' · , ,. ,.~ . . .., :;:..-.--.o,,,: ~--..- , ,- .... o. o, .. ,.'~'-.;..~ .,;~ -._ :, %. · · ........ :..:% ..... . .. i. '.~ -.-' :.-.-~ :'----.: '.' . · :...:'.?_':'-. ::.::-... .. '" ..'.- .. ' ' '~,,..ASKA OIL AND GAS CONSERVATION COMI~,..,$1ON ~ ~ !.~ [ APPLICATION FOR SUNDRY APPRO I . $ 1. Type of Request: Abandon ~ Suspend ~ Operaaon Shutdown __ Re-enter suspended well__ Alter casing __ Repair well __ Plugging __ Time extension __ Sl~mulate __ Change approved program ~ Pull tubing __ Variance__ Perforate x Other ~ 2. Name of Operator 5. Type of Well:v' 6. Datum elevation (DF or KB) BP Exploration (Alaska) inc. Development /'~ KBE = 76.98 AMSL feet Exploratory __ 3. Address Stratigraphic~ 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Ser~ce ~ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 2078' NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM A-20 (24-01-10-13) PBU At top of productive interval 9. Permit number 1074' NS/_, 1490'EWL, Sec. 01, TION, R13E, UPM 82-13 At effective depth 10. APl number 4652' NSL, 1669' EWI., Sec. 01, TION, R13E, UMI 50- 029-20702 At total depth 11. Field/Pool 291'NSL, 1851' EWI., Sec. 01, TION, R13E, UPM Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 13034 feet Plugs (measured) true vertical BKB 9570 feet Effective depth: measured 12568 feet Junk (measured) top of perf gun fish @ 12792' true vertical BKB 9224 feet Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20x30 8 c.y. 135 139 Surface 2720 13 3/8 3720 c.f. 2745 2685 Intermediate 11868 9 5/8 1711 c.f. 11893 8824 Production -- Lin · r 1625 7 630 c.f. 11409-13034 8462-9570 Perforation dePth: measured 11881'-11898' (Sag R) 12010'-12053', 12070'-12080', 12090'-12131', 12136'-12154', 12164'-12173'(ivishak) truevertical subsea 8738'- 8751' (Sag R)RECEIVED 8836'-8958' (five Ivishak intervals) Tubing (size, grade, and measured depth)JUL t :t 3 1/2" L-80 to 11356' with 2 7/8" tailpipe to 11474' Packers and SSSV (type and measured depth) A~aska 0it & Gas CI:II:I~ 9 5/8" BOTpacker at 11356~ 3 1/2" SSSV at 2162' ~ ~ 13. Attachments Description summary of proposal X Detailed operations program ~ BOP sketch X 14. Estimated date for commencing operation 15. Status of well classification as: July 1990 16. If proposal was verbally approved Oil Gas ~ Suspended ~ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~J~ //.f~l~,t,,~..~ Title Supervisor Waterflood/Miscible Flood Date Conditions of approval: Notify Commission so representative may witness I Approval No. ~,0 Plug integrity BOP Test ~ Location clearance ~ I Mechanical Integrity Test~ Subsequent form required 10- order of the Commission ORIGINAL SIGNE0 BY ~ ...... ,,- ,, o,,-ru Commissioner Date ~ ' Approved by Form 10-403 Rev 06/15/88 ~'""" ............. ^ ....... ., ,-,AS. UBMIT It~ TRIPLICATE Approved Co Returnlgd A-20 STATE SUNDRY FOR CTU HCL, JOB 1 RU slickline and pull the SSSV. RIH with a maximum size drift and a TEL. Ensure no obstruction exists in wellbore and tag PBTD. Last tag was 12568' on 6/21/90. ., Obtain wellhead sample. Using the APl RP 42 emulsion testing procedures, test emulsion tendencies when mixing a wellhead fluid sample with live and spent 15% HCL (with additives) at 180 deg F. Test with 5000 ppm ferric ion added. Adjust the type and volumes of additives as dictated by the emulsion test results. 1 Rig up for a CTU acid job. Ensure a check valve is installed between the well and pump van. Isolate SSSV. RIH with CTU. 4. Hang CT at 8850' MD and fluid pack with seawater. Acidize 112' (224 holes) of Zone 4 perfs with 4500 gals 15% HCI and additives. Maximum pressure is 4000 psi. Filter fluids to 3 microns. Reciprocate across perfs from 12010' to 12154' MD while acidizing and pump as follows. Simultaneously pump seawater down the backside at a minimum rate (.5 -1 BPM). 1) 2) 3) 4) 5) 6) 7) 8) 9) lO) 11) 9OO gal 15% HCI 1/4 diverter stage 900 gal 15% HCI 1/4 diverter stage 900 gal 15% HCI 1/4 diverter stage 900 gal 15% HCI 1/4 diverter stage 900 gal 15% HCI 1000 gal arctic diesel with 10% mutual solvent Displace to perfs with diesel (84 lbs. = 1.5 ppp) (84 lbs. = 1.5 ppp) (84 lbs. = 1.5 ppp) (84 lbs. = 1.5 ppp) 6. Rig down CT. Return well to production and obtain maximum rate test. ., Obtain a PITS/spinner survey once the well has stabilized. Ensure that ~ates do not exceed fracture pressures on the PITS. CLL 7/9/9O 1 BOWEN I(" ,CKOFF FLOW TUBES & PACKOFF ]-*--HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE VALVE FLOWLINE RISER GREASE LINE GREASE ' ~.MANIFOLD BOP '"*-GREASE RESERVOIR BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 - Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 10/11/89 Transmittal: 80475 From: Information Control Well Records LR2-1 Subject: BP CASED ~OLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-12 Completion 10/04/89 -...~1 8787-95717 Sch A-20 PROD-F 10/07/89 81 11800-12284 Sch 5' Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 10/09/89 Transmittal: 80461 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-20 Tubing Cutter 09/30/89 91 11235-11415 Sch 5" E-26 PERF 10/02/89 91 9350-9709 Sch F-Q9 PERF 09/30/89 91 9750-10169 Sch S-08 PERF 10/01/89 91 8440-9379 Sch S-08 Pressure 10/01/89 91 9097-9350 Sch Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR ~TE OF _~ ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 09/01/89 Transmittal: 80323 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-20 CCL 08/02/89 ~1 11162-12639 HRS 5" M-3I SPINNER 08/07/89 91 10865-10480 HRS Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RE ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. .,4 900 East Benson Boulevard // P.O. Box 196612 ~'~'~ Anchorage, Alaska 99519-6612 (907) 561-5tll September 6, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton Gentlemen' Well A-20 (24-01-10-13) PBU, Enclosed, in duplicate, is form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of pulling tubing, perforating, and performing a fracture job on the well. Yours very truly, R.V. Schock Workover/Completions Supervisor RVS/KTH Enclosures (4) cc: J. Martin (MB9-4) North Slope Production Engineers Mark Grindle (MB 5-3) Well File R£C£1V£D S EP o 8't989 Alaska 0ii & Gas Cons. Commission .. Anchorage STATE OF ALASKA ,$KA OIL AND GAS CONSERVATION COMM ~ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing X "~. 'N~me of operator stimulate Plugging Perforate x Alter casing Repair well Other X Fracture 5. Type of Well: Development Explorata7 StralJgraphic BP Exploration 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 Plugs (measured) 9570 feet BKB 6. Datum elevation (DF or KB) KBE-- 76.98 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-20 (24-01-10-13) 9. Permit number/approval number 82-13 / 9-227 10. APl number 50- 029-20702 11. Field/Pool Prudhoe Oil Pool 4. Location of well at surface 2078' NSL, 1704' WEL, SEC. 35, T11N, R13E, UPM At top of productive interval 1074' NSL 1490' EWL, SEC. 01, TION, R13E, UPM At effective depth 468'NSL, 1757'EWL, SEC. 01, TION, R13E, UPM At total depth 291' NSL, 1851' EWL, SEC. 01, TION, R13E, UPM 12. Present well condition summary Total depth: measured 13034 feet true vertical Baker bridge plug drilled & pushed to 12, 651' Effective depth: measured true vertical 12651 feet Junk (measured) Top of perf gun fish @ 12792' 9332 feet BKB Casing Length ..Structural -- Conductor 110' Surface 2720' Intermediate 11868' Production Liner 1625' Perforation depth: measured Tubing (size, grade, and measured depth) Size Cemented Measured depth True vertical depth BKB 20" x 30" 8 cu yd 135' 139' 13-3/8" 3720 cu ft 2745' 2685' 9-5/8" 1711 cu fl 11893' 8824' .. 630 cuft 7" 11409'-13034' 8462' - 9570' 11881'-11898'; 12010'-12053'; 12070'-12080'; 12090'-12131'; 12136'-12154' (open intervals) 12164'- 12173' (squeezed interval) true vertical 8944' (five open intervals) 8951' - 8958' (squeezed interval) 3-1/2" L-80 to 11376' with 3-1/2" taiipipe to 11454' Packers and SSSV (type and measured depth) 9-5/8" TlW packer at 11376'; SSSVat 1989' 13. Stimulation or Cement squeeze summary Performed hydraulic fracture job on Sag River interval August 9, l~,r 1¸4. Intervals treated (measured) 11881'- 11898' Treatment description including volumes used and final pressure · RePresentative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure S EP 0 81989 Alaska 0il & 6as C0as. C0mmi Tubing Pressure Prior to well operation 12 hr. test Subsequent to operation ~2 hr test "'15. Attachments 1160 931 539 1538 psig 170 16 170 812 psig 16. Status of well classification as: I Copies of Logs and Surveys run Daily Report of Well Operations X I Oil X Gas Suspended Service "'1 ~. I hereby ce~ify that the foregoing,is truce and correct to the best of my knowledge. Signed ~ ~ Title Completion Engineering Supervisor Form 10-404 Rev 06/1~8 305 psig 292 psig Date c~'~,,7/,~, SUBMIT IN DUPLIOATE ~sion ATTACHMENT I WELL A-20 WORKOVER PROCEDURE Procedure Outline: , 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. MIRU workover rig. Accepted rig at 1200 hfs on 06-24-89. Pulled BPV. Circulated diesel from well. Installed 2-way check valve. ND tree. NU & tested BOP's to 5000 psi. Cut tubing at 11,138'. Pulled 3-1/2" tubing. Recovered tubing fish. Recovered PBR. RIH with packer mill. Added storm packer to string. ND tubing spool. NU and tested spool and BOP. Recovered storm packer. RIH mill packer. Milled and recovered the 9-5/8" BOT packer and tailpipe assembly. RIH 6" bit. Tested 9-5/8" casing & 7" liner lap to 3000 psi. RIH 6" bit. Drilled out cement to 12,660'. RIH and set 7" Baker test packer @ 12,169'. Pressured annulus until formation fractured at 2800 psi. RIH w/5" perforating guns and perforated the Sag River Formation from 11881' - 11898'. Pickled drillpipe w/10 bbls of 15% HCL acid. Attempted frac job. Unable to fracture. Aborted frac job. Drilled out bridge plug. RIH and completed well w/3-1/2" tubing. ND BOP's. NU and tested tree to 5000 psi. Tested tubing by casing annulus to 2500 psi - OK. Released rig at 0200 hrs on 07-05-89. Daily Drilling Report -- PBU -- Workover June 26, 1989 at 0600 hrs Rig: NABORS 1ES Well: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: 0600 Depth: 12991' Day: 2 Cun'ent Operation: Pulled 3-1/2" tubing. MIRU. Accept rig 1200 hrs. 6-24-89 Set 2 way check. ND tree. NU and test BOP. Cut robing at 11138'. Pull and lay down tubing. S£P o 8 1989 Alaska 0ii & 6as Cons. commission Anchorage Daily Drilling Report -- PBU -. Workover June 27, 1989 at 0600 hrs tig: NABORS 1ES Veil: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: 2urrent Operation: POH. 0600 Depth: 12991' Day: 3 RIH recover tubing cutoff. RIH recover PBR. E Alaska 0il & Gas Cons. oommiSsi°~ Daily Drilling Report-- PBU -- Workover June 28, 1989 at 0600 hrs Rig: NABORS 1ES Well: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: 0600 Depth: 12991' Day: 4 Current Operation: Milling packer. IH with packer mill. Add storm packer to string. ND tubing spool NU and test spool and BOP. Recover storm packer. IH mill packer. BP EXiq.OR~N .. Daily Drilling Report -- PBU -- Workover June 29, 1989 at 0600 hrs Rig: NABORS 1ES Well: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: Current Operation: 0600 Depth: 12991' Day: 5 Circulating bottoms up. Milled and recovered 9-5/8" packer and tailpipe assembly. Tested liner lap to 3100 psi. - OK. Drilled out cement to 11918'. Daily Drilling Report -- PBU -- Workover June 30, 1989 at 0600 hrs Rig: NABORS 1ES Well: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: 0600 Depth: 12991' Day: 6 Current Operation: RIH with test packer. Drilled out cement to 12660'. Cleaned up hole. RIH with Baker Retro-o-matic test packer. Daily Drilling Report -- PBU -- Workover July 5, 1989 at 0600 hrs Rig: NABORS 1ES Well: A-20 (24-01-10-13) AFE # 160494 AFE Amount: (Expense) Current Amount: 0600 Depth: 12660' Day: 11 Current Operation: Released and moving rig. Released rig at 0200 hours on 7-5-89. Moving rig from A-20 to A-25. RIH and set 7" Baker Test packer at 12169'. Pressured annulus until formation fractured at 2800 psi. RIH with 5" perforating guns and perforated the Sag Formation from 11881' to 11898'. Pickle pipe with 10 bbl of 15% HCL acid. Attempted frae job. Unable to fracture Sag Formation. Abort frae job. Drilled out bridge plug. RIH and completed well with 3-1/2" robing. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 08/22/89 Transmittal: 80279 From: Ihformation Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907)564-4445. A-20 CCL 08/14/89 81 11330-12588 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESER3~TR ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ~ OF ALASKA~ ARCHIVES DATE: 08-08-89 T%: 80246 BP FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office A-20 Static Gradient 07/25/89 Camco A-25 Static Gradient 07-25-89 Camco M-15 Flowing Gradient 07-16-89 Camco R-18 Static Gradient 07-23-89 Camco GC-IE Static Gradient 07-27-89 Camco G-17 Static Gradient 07-23~89 Camco Received: Date: ~~]~ i~~~Inf2rmat ion Control Records LR 2-1 . cur Dietz/S_ Mc ry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL' ' PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES Date: 07-10-89 T%: 80157 BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-20 COMP 06-30-89 #1 12282-12164 Sch 5" C-26. COMP 06-30-89 #1 10482-11808 Sch 5" E-0.1 COMP 06-29-89 #1 9336-9700 Sch 5" J-~21 COMP 07-03-89 #1 8819-9632 Sch 5" R-16 Comp 07-02-89 #1 11136-11391 Sch 5" GC-1E CBT 07-01-89 #1 100-6427 Sch 5" GC-1E CET 07-01-89 #1 2582-6448 Sch 5" Received: Date: Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO HOUSTON ARCO CHEVRON EXXON MOBIL" · PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR ARCHIVES 07-10-89 Date: 80149 T%: BP CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-20 TUBING CUTTER 06-25-89 #1 10019-11168 Atlas 5" B-il GAS LIFT 05-3t-89 #1 2500-11090 Camco 1"/5" J-24 PITS 06-05-89 #1 11180-11634 Camco. 5" E-09 GR/CCL 06-20-89 #1 9600-10770 Camco 5" GC1-D TEMP 06-19-89 #1 2500-2500 Camco 5" A-10 CCL 06-17-89 #1 9100-9876 Camco 5" Received: Date: Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard Re. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 March 23, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attention' Mr. C. V. Chatterton Gentlemen' Well A-20 (24-01-10-13) PBU Enclosed, in triplicate, is form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to pull tubing and perforate the well. Yours very truly, FI. V. Schock Workover/Completions Supervisor RVS/KTH Enclosures (2) cc: Jim Bragg (MB9-4) Bob Laule Well File RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well__ Alter casing __ Repair well __ Plugging __ Time extension __ SlJmulate __ Change approved program__ Pull tubing X Variance__ Perforate X Other__ 2. Name of Operator BP Exploration 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2078' NSL, 1704' WEL, SEC. 35, T11N, R13E, UPM At top of productive interval 1074' NSL, 1490' EWL, SEC. 01, TION, R13E, UPM At effective depth 468' NSL, 1757' EWL, SEC. 01, TION, R13E, UPM At total depth 291' NSL, 1851' EWL, SEC. 01, TION, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length 5. Type of Well: Development x Expk~ory __ Strafigraphic __ 6. Datum elevation (DF or KB) KBE- 76.98 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number A-20 (24-01-10-13) 9. Permit number 82-13 10. APl number 50- 029-20702 11. Field/Pool Prudhoe Oil Pool 13034 feet Plugs (measured) 9570 feet BKB 12792 feet Junk (measured) 9435 feet BKB Top of perf gun fish @ 12792' Size Cemented Measured depth 110' 20"x30" 8 cu yd 135' 2720' 13-3/8" 3720 cu ft 2745' 11868' 9-5/8" 1711 cu fl 11893' 1625' 7" 630 cu fl 11409'- 13034' measured 11881'-11898' (Sag R) 12010'-12053', 12070'-12080', 12090'-12131' (Ivishak) true vertical (subsea) 8738'-8751' (Sag R) 8836'-8927' (three Ivishak intervals) True vertical depth BKB 139' 2685' 8824' 8462'-9570' RECEIVED Tubing (size, grade, and measured depth) 3-1/2" L-80 to 11356' with 2-7/8" tailpipe to 11474' ~, Packers and SSSV (type and measured depth) 9-5/8" BOYpacker at 11356'; 3-1/2" SSSV at 2162' ~.~.~I~[ska 0ii .& Gas 'ConS. 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch X 14. Estimated date for commencing operation 2nd Quarter 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas~ Suspended ~ Service 17. I hereby certify that the foregping is true artd cor~ best of my knowledge. Signed ~,~~ ~[~/'""~-v'"Title Completion Engineerinf~ Supervisor /' FOR COMMISSION USE ONLY o,~ eG C,.O~[ Appr°val N°- Conditions of approval: Notify Commission so representative may witness Plug integrity_ BOP Test__ Location clearance Mechanical Integrity Test __ Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE A-20 PROPOSED RIG WORKOVER Outline Procedure: Attachment 1 . 2, 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Pull SSSV. RU coiled tubing and cement squeeze all existing perforations. Test outer annulus to 2000 psi. Circulate well & freeze protect to 2000' with diesel. Set BPV. MIRU workover rig. Pull BPV. Circulate diesel from well. Install 2-way check valve. ND tree. NU & test BOP's to 5000 psi. Pull 3-1/2" tubing. Recover PBR. Install storm packer. Replace and test the 9-5/8" packoff. Mill and recover the 9-5/8" BOT packer and tailpipe assembly. RIH 7" RTTS. Test 9-5/8" casing & 7" liner lap to 2500 psi. RIH 6" bit. Clean out cement to 12,991'. Test cement squeeze to 1000 psi. RIH 9-5/8" casing scraper to 11,409'. Reverse circulate. RIH 7" casing scraper to 12,991'. Reverse circulate. Change well over to clean brine. RIH 8.5" gauge ring/junk basket to 11,409'. Perforate well with 5" casing guns as follows: 11,881'-11,898' 4 spf at 90 degree phasing RIH with 3-1/2" tubing with 6 GLM's. Set 2-way check valve. ND BOP's. NU & test tree to 5000 psi. Pull 2-way check valve. Displace the backside to inhibited brine. Set plug in the tailpipe. Set 9-5/8" permanent packer. Test tubing X casing annulus to 2500 psi. Pressure up annulus and shear valve in GLM. Displace annulus to 140 bbls diesel & "U" tube diesel to tubing. Set BPV. Release rig. RECEIVED ~.~aska ~O~l & Gas'Cons, Cornmissio~ ,~,i ~choraga WORKOVF_R B.O.P. STACK CONFIGURATION 13-S/8 IN. TRIPLE RAM STACK SO00 PSI WP ATTACHMENT II -.. DRILLING ANNULAR PREVENTER ! PI PE RAMS ! I _ 1 PIPE RAMs 2 IN. KILL LINE J,, GATE GATE [ I 1 I 4 IN. CHOKE LINE DRILLING ~ SPOOL 1 GATE GATE I ! BLIND RAMS R!EE VED I Gas Co~s, Oommiss~o~ Standard Alasl~a ~( P~aductlon Company 900 East Beflson Boulevard P.O. ~ 196612 Anchorage. AIosLo 99519-6612 (~71 564-5 ! I I TO: HOUSTON ARCO CHEVRON EXXON TEXACO MO B IL PHfLLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ALASKA PRODUCTION Date: 11-04-88 Ti: 79495 A-20 H-14 W-29 The following material Is being submitted herewith. Please acknowledge receipt by signlng a copy of this letter and returning It to this office: TF2~ 10-22-88 fi1 11100-11400 CAMCO 5" LEAK DET 10-22-88 fi1 9000-9650 CAMCO 5" PROD-F· 10-22-88 f~l 10500-10805 CAMCO 5" Rece l V ." ~ Lois Arnold -..~ ~ .as one. Corn~issjor~ I NFORNA'I'ION CONTROL Date ~'~JC'oJ'al~(~ We I I Records LR2- I A u~! of the o,~g~nol .~,onda,d O~1 Co,~pony . . Founded ;n Cle.,elond. Ohio. *n 18Z0 · : TO: REFERENCE: HOUSTON ARCO CH EVRON E:CKO':'~ TE>b\CO MO B I L PliILLIPS STATE OF ALASKA GEOSC IENCES RES ERVOIR ARCIilVES SAPC CASED HOLE FINAL LOGS I~;DEXED STANDARD ~ ,. :..o .~, . ~,.., . _ Date: 10-21-88 T#: 79453 The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-05 A-20 N-09 Prod-F 10-10-88 10700-11170 ~1 Camco 5" Prod-F 10-05-88 11900-12300 ~1 Camco 5" Temp 10-06-88 9648-9656 #1 Camco 5" Rece i ved Date ;ou.,~ed .., Cl*.~.lo,,d ~,,) .,, 1870 Shirley R. McCurry I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska .~ Production Company [[ 900 East Benson Boulevd,,~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 October 28, 1988 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well A-20 (24-01-10-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. BJP:JAM Enclosures (4) cc: L. Burke (MB12-1) Well Records (LR2-1) w/10 A-20 Well File Yours very truly, Bi J. P~icky, SuperVisor Waterflood & Miscible Flood RECEIVED A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2078'NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM At top of productive interval 1074'NSL, 1490'EWL, Sec. 01, TION, R13E, UPM At effective depth 468'NSL, 1757'EWL, Sec. 01, TION, R13E, UPM At total depth 291'NSL, 1851'EWL, Sec. 01, TION, R13E, UPM 1. Present well condition summary Total depth: measured 13034 feet Plugs (measured) 5. Datum elevation (DF or KB) KBE-- 76.98 AMSL feet S. Unit or Property name Prudhoe Bay Unit 7. Well number A-20 (24-01-10-13) PBU 8. Approval number 8-552 9. APl number 5 0 - 029-20702 10. Pool Prudhoe Oil Pool true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2720 I nte rmed i ate 11868 Production ' -- Liner 1625 Perforation depth: BKB 9570 feet 12792 feet BKB 9435 feet Size 20x30 13 3/8 9 5/8 7 : Junk (measured) top of perf gun fish @ 12792' Cemented Measured depth True Vertical depth BKB 8 c.y. 135 139 3720 c.f. 2745 2685 1711 c.f. 11893 8824 630 c.f. 11409-13034 8462-9570 measured 11881'-11898' (Sag R) 12010'-12053', 12070'-12080', 12090'-12131', 12136'-12154', 12164'-12173' (lvishak) true vertical subsea 8738'- 8751' (Sag R) 8836'-8958' (five Ivishak intervals) Tubing (size, grade and measured depth) 3 1/2" L-80 to 11356' with 2 7/8" tailpipe to 11474' Packers and SSSV (type and measured depth) 2. Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure , Prior to well operation. Subsequent to operation Representative Daily Average Production or Injection Data. OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1180 683 190 1120 1000 600 850 1435 Tubing Pressure 288 261 4. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Supervisor Waterflood/Miscible Flood Form 10 404 ev 12~85 ~ Date Submit ~n-Duplicate~/ WELL A-20 (24-01-10-13] PBU ADD'L. PERFORATION OPERATIONS Thc following additional intervals were perforated September 19, 1988 using Schlumberger 2 1/8" carrier guns at 4 spf: 12136' - 12154' MD BKB (8931' - 8944' TVDss) Ref. BHCS, 3/5/82 12164' - 12173' MD BKB (8951' - 8958' TVDss) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations, then tested. jm 9/28/88 .Slando~d Alaska ~f' Ptodu¢ lion Company 900 [O~,l ~en~,on PO Bo,, 196612 Ancho, oge. AIo,,Lo 99.519.6612 (9071 .564-5 I I I HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RES ERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ALASKA PRODUCTION Date: 9-26-88 r~: 79349 The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to thls office: A-20 A-30 M-06 M-19 PERF 09-19-88 #1 11950-12400 Sch 5" PERF 09-17-88 '#1 10800-11145 Sch 5" Packer Record 09-20-88 #1 10200-11325 Sch 5" PERF 09-20-88 #1 9400-10239 Sch 5" Rece I ved Date Shirley R. McCurry I NF~T I ON CONTROL Wel I Records LR2-1 A un;I Of ~'he or;g;nol Standard C~I Company Founded in Cle~elond. Oh;o. in 1870 / Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 July 13, 1988 ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well A-20 (24-01-10-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. BJP:JAM Enclosures (9) cc: J. L. Haas (MB12-1) A-20 Well File Yours very truly, Waterflood & Miscible Flood A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ( .... ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension r'l Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order n Perforate [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2078'NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM At top of productive interval 1074'NSL, 1490'EWL, Sec. 01, TION, R13E, UPM At effective depth 468'NSL, 1757'EWL, Sec. 01, TION, R13E, UPM At total depth 291'NSL, 1851'EWL, Sec. 01, TION, R13E, UPM 5. Datum elevation (DF or KB) KBE = 76.98 AMSL feet $. Unit or Property name Prudhoe Bay Unit 7. Well number A-20 (24-01-10-13) PBU 8. Permit number 82-13 9. APl number 5 0 - 029-20702 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2720 Inte rmed i ate 11868 Production -- Liner 1625 Perforation depth: measured 13034 feet BKB 9570 feet 12792 feet BKB 9435 feet Size 20x30 13 3/8 9 5/8 Plugs (measured) Junk (measured) top of perf gun fish @ 12792' Cemented Measured depth True Vertical depth BKB 8 c.y. 135 139 3720 c.f. 2745 2685 1711 c.f. 11893 8824 7 630 ~L 11409-13034 11881'-11898' (Sag R) 12010'- 12053', 12070'-12080', 12090'-12131' (ivishak) true vertical subsea 8738'- 8751' (Sag R) 8836'-8927' (three Ivishak intervals) 3 1/2" L-80 to 11356' with 2 7/8" tailpipe to 11474' Tubing (size, grade and measured depth) 8462-9570 Packers and SSSV (tYpe and measured depth) 9 5/8" BOTpacker at 11356'; 3 1/2" SSSVat 2162' 2. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation July/August 1988 4. If proposal was verbally approved Name of approver Subseauent Wor]~ RennH-,~ n~ Date approved 5. I herebY~,~c,ertify that/~,/~f~./,~i~s true and correct to the best of my knowledge Signed ~_~/2~_.~..~_~_.~__~/~~ Title Supervisor Waterflood/Miscible Flood f" ~ Commission Use Only Conditions of approval Notify commission so representative may witness. IApproval No. [] Plug integrity [] BOP Test [] Location clearanCe[ ...Approved Copy . ///~ ./~ ~, ~. Approved by ( ~' ~~~'~~~~~- Commissioner the commission of Form 10-403 Rev 12-1-85 "-' 8'ubn~ in triplicate WELL A-20 (24-01-10-13) PBU ADD'L. PERFORATIO]~ PROPOSAL We propose to perforate the following additional intervals during July/August 1988 at 4 spf: 12136' - 12154' MD BKB (8931' - 8944' TVDss) Ref. BHCS 3/5/82 12164' - 12173' MD BKB (8951' - ~8958' TVDss) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jm 7~08~88 Coiled Tubing Blow-Out-Preventers Coiled Tubing Pack-Off Blind Rams Cutter Rams 2" Chicksan (Kill Line) Slips Pipe Rams Pump-In Sub ~ (Circulate/Returns) ell Head Swab Valve Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99.519-6612 (907) 561-5111 ALASKA PRODUCTION July 6, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well A-20 (24-01-10-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-4044 Report of Sundry Well Operations, .for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, BJP:JAM~ Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 A-20 Well File B. J. Poficky, ~u~_~rvisor Waterflood & Mis~cible Flood A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate I'R Pull tubing I"1 Alter casing [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address i P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2078'NSL, 1704'WEL, Sec, 85, T11N, R13E, UPM At top of productive interval I074'NS1., 1490'EWL, Sec. 01, TION, R13E, UPM At effective depth 468'NS1., 1757'EW1., Sec. 01, TION, R13E, UPM At total depth 291'NSL, 1851'EW1., Sec. 01, TION, R13E, UPM 5. Datum elevation (DF or KB) KBE = 76.98 AMSL fee t $. Unit or Property name Prudhoe Bay Unit 7. Well number A.20 (24-01-I0-13) PBU 8. Approval number 9. APl number 5 0 - 029-2O702 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2720 Intermediate 11868 Production -- Liner I625 Perforation depth: measured 13034 feet BKB 9570 feet 12792 feet BKB 9435 feet Plugs (measured) Junk (measured) top of ped gun fish ~ 12792' Size Cemented Measured depth 20x30 8 c.y. 135 13 3/8 3720 c.f. 2745 9 5/8 1711 c.f. 11893 7 630 c.f. 11409-13034 11881'-11898'(Sag R) 12010'-12053; 12070'-12080', 12090'-12131' (Ivishak) true vertical subsea 8738'-8751'(Sag R) 8836'-8927' (three Ivishak intervals) Tubing (size, grade and measured depth) 3 1/2" L-80 to 11356' with 2 7/8" tailpipe to 11474' Packers and SSSV (type and measured depth) 9 5/8" BOTpacker at 11356~'3 1/2" SSSV at 2162' True Vertical depth 139 2685 8824 8462-9570 2. Stimulation or cement squeeze summary Intervals treated (measured) Treatment deScription including volumes used and final pressure . Prior to well operation Subsequent to operation F{epre~el3t~,tive Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1290 801 153 1052 1340 804 175 1067 Tubing Pressure 252 251 4. Attachments Daily Report of Well Operations !~ Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge .~~, Form 10-404 Rev.~ 2-1-85 ~ Title Supervisor Watedlood/Miscible Flood Date Submit ti~ Ouplicate WELL A-20 (24-01-10-13~ PI3U ADDITIONAL PERFORATING OPERATIONS The following Sag River interval was perforated April 26, 1988, using Schlumberger 2 1/8" Ultrojet guns at 4 spf. 11771' - 11898' MD BKB (8738' - 8751' TVDss) A lubricator was installed and tested to 3500 psi for all well work. Following perforating operations; the well was returned to production and tested. jm 6/24/88 INDEXED DA L1.A S ARCO CHEVRON E..'CXON TEXACO Date: 05/09/88 TO: MOBIL Tt: 78807 PHILLIPS GEOSCIENCES STANDARD AL ASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by slgnlng a copy of thls letter and returning it to this office: R-5 R-15 R-16 ~a X-17 ~ z-08 ~-08 -~ z-08 ~ R-16 Perf. Record 04/26/88 #1 11635-12200 Sch 5" GR Spectroscopy TOOL (GST) 04/30/88 #1 9900-10168 Sch 5" Noise-Temp. 04/27/88 #1 50-8400 Sch 5"/2" Collar 05/02/88 #1 8600-9409 Atlas 5" Perf. Record 04/29/88 #1 11100-11500 Sch 5" GR Spectroscopy Tool (GST) 05/01/88 #1 9815-10168 Sch 5" CET 04/29/88 #1 10700-11660 Sch 5" CBL/VDL 04/29/88 #1 10700-11640 Sch 5" GR/CCL (TCP) 04/30/88 #! 11110-11450 Sch 5" Collar 05/01/88 #1 11200-11400 Atlas 5" Rece i ved Date Victoria Aldridge I NFC~RMAT I ON CONTROL Well Records LR2-1 A un,t ot ,he o,,9, nol ,~l'ondord 0~1 Comport!/ Fo'-~,,'J,t'd ,n (]l,~..(,.Iond. C~,o..n Standard Alaska f~ Production Company ~, 900 East Benson Boulev6ru P.O Box 196612 Anchorage, Alaska 99519-6612 (907t 561-5111 STANDARD ALASKA PRODUCTION March 2, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well A-20 (24-01-10-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. BJP:JAM Enclosures (9) cc: J. L. Haas (MB12-1) A-20 Well File Yours very truly, B. J. ~oiicky, ~ervisor Waterflood & Miscible Flood RECEIVED A~aska Oil & Gas Cons. Commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ii' ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS ti. Type of Request: Abandon [] Suspend [] Operation Shutdown [] me ex~ens~n [] Change approved program [] Plugging [] Stimulate [] Name of Operator Standard Alaska Production Company Address Re-enter suspended well [] Alter casing [] Pull tubing [] Amend order [] Perforate [] Other r'l P. O. Box 196612, Anchorage~ Alaska 99519-6612 .. LoCation of well at surface 2078' NSL, 1704' WEL, Sec. 35, T11N, R13E, UPM At top of productive interval 1074' NSL, 1490' EWL, Sec. 01, TION, R13E, UPM At effective depth 322'NSL, 1835'EWL, Sec. 01, TION, R13E, UPM At total depth 291'NSL, 1851'EWL, Sec. 01, TION, R13E, UPM 5. Datum elevation (DF or KB) KBE = 76.98 AMSL feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number A-20 (24-01-10-13) PBU 8. Permit number 82-13 9. APl number 5 o. 10. Pool Prudhoe Oil Pool 1. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Length Structural -- Conductor 110 Surface 2720 Int e rm ed i ate 11868 Production -- Liner 1625 Perforation depth: measured 13034 feet BKB 9570 feet 12991 feet BKB 9546 feet Size Plugs (measured) Junk (measured) Cemented 20x30 8 c.y. 13 3/8 3720 c.f. 9 5/8 1711 c.f. Measured depth 135 2745 11893 7 630 C. fo 11409-13034 12010'-12053', 12070'-12080', 12090'-12131' true vertical subsea 8836'-8927' (three intervals) Tubing (size, grade and measured depth) 3 1/2" L-80 to 11356' with 2 7/8" tailpipe to 11474' True Vertical depth BKB 139 2685 8824 RECEIVE, Packers and SSSV (type and measured depth) 9 5/8" BO T packer at 11356?3 1/2" SSS V at 2162' ^~aska 0il & Gas Cons. C0mmiss[0a Anchorage 2. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation February 1988 ~nh.~e,m]ent; Work Reportecl 14. If proposal was verbally approved ]Foz~ ~o. ~ Dated.~-/~.~ Name of approver Date approved 15. I hereby cert~ that they, fbr,~9~g j~,.;J'ue and correct to the best of my knowledge SIc, lnod Title Supervisor Watedtood/Miscib/o Flood Date __~____ Commission Use Only Conditions of approval Approved by Notify commission so representative may witness IApproval No. ~--~ [] Plug integrity [] BOP Test [] Location clearance ~'f/,~ Approved Copy etu rn..~n~,ed ~ Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH Form 10-403 Rev 12-1-85 by order of commission Submit in triplicate Well A-20 (24-01-10-13) PBU ADDITIONAL PERFORATING PROPOSAL We propose to perforate the following Sag River interval during February 1988 at 4 spf: 11881' - 11898' MD BKB (8738' - 8751' TVDss) Depths are referenced to BHCS, 03/05/82 A lubricator will be installed and tested to 3500 psi for all well work. Following perforating operations, the well will be returned to production and tested. 0833Z 02108188 o. .. FLOW;TUBES & PACKOFF BOWEN PACKOFF }-'-' HAND PUMP GREASE SEAL FLOWTUBE FLOWLINE FLOWLINE VALVE GREASE LINE RISER GREASE ,,, _ / MANIFOLD GREASE PUMP --.-GREASE RESERVOIR BOP SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 June 4, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells A-15(31-01-10-13) and A-20(24-01-10-13) PBU Gent lemen: Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named welL. These contain our subsequents to performing scale ihibitor matrix treatments on these wells. Yours very truly, cc: T. N. Tyler Well Records (LR2-1) Drilling Well File ~17 ., s A. Bragg ~  District Petroleum Engineer (Acting) ,.RECEIVED JUN ! ! ]985 uii a L~as Cons. Commission Anchorage ( STATE Of ALASKA O~/ ALASKA OIL AND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum Company 82-13 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-2070~ 4. Location of Well 9. Unit or Lease Name Prudhoe Bay Unit At Surface: 10. Well Number A-20 (24-01-10-13) PBU 2078' NSL, 1704' WEL, Sec. 35, TllN, R13E UPM ll. Field and Pool Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Brudhoe 0il Pool KBE = 76.98' AMSLI ADL 47472 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate ~ Abandon [] Stimulation ~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). A 89.3 Bbl. scale inhibitor matrix ~queeze was performed over the following intervals on May 17, 1985, Prior to the inhibitor squeeze treatment, a 2000 gallon EDTA tubing wash was performed with coiled tubing on May 15, 1985. After both of these treatments the well was shut-in for 24 hours. The SSSV was removed prior to the treatments and reset after the job at 2150'. 12,010'-12,053' BKB (Ref. BHCS/GR, 3-5-82) 12,070'-12,080' BKB ( " ) 12,090'-12,131' BKB ( " ) RECEIVED Alas~a Oif& Gas Cons. Com~issiori Anchorage ~-~4'lg~ned~/~/~]hereby certify that~~the foregoing is true and correct to the beStTitleofActing DistriCtpetroleummY knowledge. Engineer Date~)/~'/i~' [~e s~a(~e below for Commission use ~ CondO,ns of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date __ Form 10-403 Rev. 7ol-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ( STATE OF ALASKA :~i ALASKA OIL AND GAS CONSERVATION C v~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL I--I COMPLETED WELL [] OTHER [] 2. Name of Operator Sohio Alaska Petroleum Company 3. Address P. O. Box 6612, Anchorage, Alaska 99502 4, Location of Well At Surface: 2078' NSL, 1704' WEL, Sec. 35, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 76.98' AMSL 6. Lease Designation and Serial No, ADL 47472 7. Permit No. 82-13 8. APl Number 50- 029-2070~ 9. Unit or Lease Na~e Prudhoe Bay Unit 10. Well Number A-20 (24-01-10-13) PBU 1 1. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NO_-I'ICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing '[] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of s:tarting any proposed work, for Abandonment see 20 AAC 25.105-170). A 89;3 Bhl~." scale inhibitor matrix squeeze will be performed over the following intervals in April/May, 1985. Prior to the inhibitor squeeze treatment, a 2000 gallon EDTA tubing wash will be performed with coiled tubing. After both of these treatments the well will be shut-in for 24 hours. The SSSV will be removed prior to the treatments and reset after the job at 2150'. 12,010' 12,053' BKB (Ref. BHCS/GR, 3-5-82) 12,070'-12,080' BKB ( " ) 12,090'-12,131' BKB ( " ) space/~ow for corn _mission'use ConditioVf Approval, if any: he[eby certify that the foregoing is true and correct to the best of my knowledge. Acting District Tit~e Petroleum Engineer Approved by Approved Copt Returned / By Order of COMMISSIONER the Commission Form 10-403 Date Submit "Intentions" in Triplicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3~ ~ ~ "c" STREE'i",' ANCHORAGE, ALASKA TELEPHONE (907') 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 ~ March 26, 1985 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Wells A-15 (31-01-10-13) and A-20 (24-01-10-13) PBU Attention: Mr. C. V. Chatterton Gentlemen: Enclosed, in triplicate, is Form 10-403, sundry Notices and Reports on Wells for the above-named wells. These contain our Proposals to perform scale inhibitor matrix treatments on these wells. Yours very truly, JAB/~H/jmw Enclosures cc: A. E. Leske Well Records (LR2-1) Drilling Well File ~17 RECEIVED 2 9 1.985 .aJaska Oil ~, Gas Cons. Commission Anchora[m INDEXED SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON GETTY TO. SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only) 3; ~ ~ "C" STREE'f ANC ~O.=.aG~ ALASKA TELEPHONE (907~ 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 9-27-84 CC#: 75766 REFERENCE: S0~. FINAL DATA - PRESSURE SURVEY DATA PULSE TEST ~/~he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- PULSE TEST A-15~..-~'PULSE TEST 8-29-84 GO A-18 PULSE TEST 8-29-84 GO A-19''~ PULSE TEST 8-29-84 GO A-20'"~_ PULSE TEST 8-29-84 Dresser A-21'" PULSE TEST 8-29-84 Otis (4/82) RECEIVED DATE Amska 0i! & Gas Cons. Comr~sion Anc,,orage Carolyn Bishop Development Geology Well Records SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON CETTY TO: SFO/UNIT/STATE: (-Marathon) MOBIL PHILLIPS ~TATE O~ BPAE (Transmittal Only) CENTRAL FILES (CC#' s-Transmit tal Only) 3111 "C" STREET ' ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 4/18/83 CC#: 56299 REFERENCE: ,. ~ CASED HOLE FINAL LOGS VThe following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- Complet ion EPL 2/17/83 #1 11780~12876 Sch 5" 1/30/83 #1 9900~11350 Sch 5" 3/5/83 #1 7960-9382 Sch 5" 1/31/83 #1 11198~12831 Sch 5" 1/31/83 #1 12337-12844 Sch 5" t~ p ? rd -~ ? ~ (4/82) RECEIVED DATE SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO - CHEVRON 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 ~o:SFO/UNIT/STATE: (-Marathon) CENTRAL EXXON GETTY MOBIL PHILLIPS BPAE (Transmittal Only) FILES (CC#'s - Transmittal Only). 4/1-3/83 Date: Trans. #: - CCf!: 56282 REFERENCE: OFINAL PRESSURE SURVEY DATA DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it"to this office:-- Pressure Survey & BHPD Otis 2/27/83 B-7~~'' Pressure Analysis & BHPD Camco 3/8/83 B-5~ " " " " Camco 3/9-11/83 C-8~ Pressure Survey & BHPD Otis 2/10,12/83 A-13~/ " " " " GO 3/15/83 J-Ir " " " " GO 3/8,9/83 R-20~-' " " " " GO 3/10,11/83 A-24 ~'~' Pressure Analysis & BHPD Camco 3/21/83 E-19~ " Survey " " GO 3/23/83 A-25~ Pressure Survey & BHPD GO 4/1,2/83 A-23 ~' Pressure Analysis Camco 4/1/83 A-26 ~' " " Camco 3/17/83 A-27 ~'. " " Camco 3/30/83 A-28f/ Pressure Survey Otis 3/9/83 B-9 w.~. Pressure Survey Otis 3/30/83 E-12 b / Pressure Analysis Camco 3/14/83 E-13 / Pressure Analysis Camco 3/19/83 E- 14 ~'< Pressure Survey Otis 3/27/83 E-i~/~'' " " GO 3/3/83 4/82) RECEIVED DATE Victoria Aldridge Gas Cons. Commis$~iDvelopment Geology An~c~orage Well Records TP1-5 SOHIO ALASKA PETROLEUM COMPANY SF0 ARCO CHEVRON EXXON 311 I "C" STREEf ANCHORAGE. ALASKA TELEPHONE (907) 265 0000 MAIL: POUCH 6612 ANCHORAGE, ALASKA 99502 GETTY To: SFO/UNIT/STATE: (-Marathon) . MOBIL BPAE (Transmittal Only) CENTRAL FILES(CC#'s-Transmittal Only). Date: 4/12/83 Trans.#: - CC#: 56280 REFERENCE:  '~TO HOLE FINAL LOGS CASED ~,//The following material is being submitted herewith. Please acknowledge receipt by sign,nd a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: Y-12 ~'' TDT-M 2/10/83 #1 8950~.9710 Sch 5" ~-2~0~' Spinner 2/27/83 #- 11800-12250 Otis 5" A-24~/~Spinner 3/23/83 #- 11020~11112 Camco 5" G-2'-'" Spinner 3/20/83 #2 9850-10222 Otis 5" H-3~'- Spinner 3/11/83 #1 9800-10306 Otis 5" H-3 / Spinner 3/28/83 #- 10071-10275 Camco 5" C-2~ ~- GR 3/10/83 #1 9600-10144 Otis 5" B-~. Temperature 3/31/83 #1 Crude-7000 Otis 5" (4/82) RECEIVED DATE Victoria Aldridge 0il & Gas Cons. !?:mmis~i0, Development Geology Anshorage ~9 Well Records TP1-5 SOHIO ALASKA PETROLEUM COL1PANY S¥O ARCO CHEVRON EXXON 3111 "C"S1~EET ANCHOI'iAGE. ALASKA TELEPHONE {9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 SFO/UNIT/STATE: GETTY (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) CENTRAL FILES (CC#'s - Transmittal Only)_ cc#: REFERENCE: SOHIO FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- 4/9/cO ,~/82) Development Geology Well Records SCHLUMBER OFFSHORE SERVICES 5000 GULF FREEWAY, P.O. BOX 2175 HOUSTON, TEXAS 77001, (713) 928-4000 PLEASE REPLY TO 500 W. INTERNATIONAL AIRPORT ROAD ANCHORAGE, ALASKA 99502 February 24, 1983 D  We have discovered an error in the Library Tapes for the following well: COMPANY NAME: SOHIO PETROLEUM COMPANY WELL NAME: S-12 LOGGING DATE: 19 MAY 82 JOB .NUMBER; 65152 ~ are replace~e~t~* tapes for the above~ Please destroy the original tapes you have already'received and re~lace with these enclosed. We apologize for any in-  venience this has caused. Thank you, S. E. Klemp Log Analyst *TO CORRECT DATA IN GR.FDN CHANNEL. SEK: sma cc: dis trib ution A DIVISION OF SCHLUMBERGER LIMITED SOl,lO ALASKA PET;{OLEUF,/1 COi:JP,,NY 10: SFO ARCO EXXON PHILLIPS sTATE OF AK CENTRAL FILES(CCI!'s-Transmittal Only ( 311 ! "C- /~t,IC t,O'~{ a GE.. ALASKA IELEI't-'ION£ 1907l 265-0000 MARL- POUCH 6-612 ANCHORAGE. ALASKA 99502 Da re' 3-9-83 Trans.#: CC#: 56201 RE F E RE NCF...: SOHIO MAGNETIC LIS TAPES & LISTINGS he following material is being submitted herewith.-Please acknowledge receipt by signing a copy of 1his letter and returning it to this office:-- 2-19-83 Open Hole ~ #68053 Run #1 Sch  H-20 2-10-83 Open Hole #68013 Run #1 Sch S-12 5-19-82 Open Hole #65152 RLm #1,2 Sch Rgp!_ac~t_~T~ R-11 1-23-83 Open Hole #66356 Run #1 Sch  D-23 1-26-83 Open Hole #66376 Run #1 Sch . H-19 1-24-83 Open Hole #66357 Run #1 Sch R-14 2-09-83 Open Hole #68001 Run #1 Sch N-17 2-04-83 Open Hole #66410 Run #1 Sch *SFO & EXXON- An Asterisk:(*) next to a listing abouve means you should have received the Tape(s) and Listing(s) directly from the respective service compa~ Please confirm this. ~[CE,VEO Anne Jones Development Geology DATE 19 Well Records C4/82) SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 February 10, 1983 Alaska Oil and Gas Conservation Commi ss ion 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: A-20 (24-01-10-13) PBU Enclosed, in duplicate are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. r s ve truly, ~.Distri~ Petroleum Engineer GJP: JLH: lh Enclosures cc: J. D. Hartz Geology Well File #17 RECEIVE! 1983 ALASKA AND GAS CONSERVATION C ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ' 1. Status of Well Classification of Service Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-13 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20709 4. Location of well at surface 9. Unit or Lease Name 2078' NSL, 1704' W-EL, Sec. 35, TllN, R13E, OPM (corrected) Prudhoe Bay Unit At Top Producing Interval top of Sag R. SST. /~) 10. Well Number 1~074' NSL, 1490' EWL, Sec. 01, T]~N, R13E, OPM A-20 (24-01-10-13) At Total Depth /~) 11. Field and Pool 291' NSL, 1851' EWL, Sec. 01, T]~N, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool KBE = 76.98' AMSL ADL 47472 12. Date Spudded2/8/82 13. Date T.D. Reached3/4/82 14' Date C°mp' Susp' °r Aband' J 15' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns3/J~l/82 feet MSL one 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 13034'MD 9570'TVD 12991'MD 9546'T~IYES[~ NOFqI 2150 feetMD 2085' 22. Type Electric or Other Logs Run GR/SP/DIL/BHCS, GR/FDC/CNL/CAL, CBL/VDL/GR/CCL, Gyroscopic Survey , _ 23. CASING. LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT.I~ER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20"×30" Insulated Conducto!~ Surface 110' 36? 8 cu. yds. concret.= · ]_q _q/8" 72~ L-80 Surface 2745' 17 1/2" 3720 cu. ft. Permafrost II 9' '5~8'" 47# L-80 Surface 11893' 12 1/4 1581 cu. ft. Class 130 cu. ft. Permafrl3st C 7" 26# L-80 11409' 13034' 8 1/2" 630 cu.. ft. Class Gi w/18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD .... interval, size and number) SIZE DEPTH SET (MD)', ' PACK'ER SET (MD) MD TVDsS Prudhoe Oil Pool Top: 12010' 8836' 3 1/2" 11475' 11356' · Bottom 12131 ' 8927 ! 26. ' ' ACID, FRACTURE, CEMENT SQUEEZE, ETC. " · .. DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED 12010'-'12053' BKB' (883,6 '-8868'' T~Dss) 12070'-12080' BKB (8881'-8889' TVDss) 12090'-12131' BKB (8896 '-8927' ~v'Dss) : , . · . · . · 27. PRODUCTION TEST · r Date First Production ~ . Methodof Operation (Flowing, gas lift, etc.) 2/2/83 Flowinq Date of Test Hours Tested PRODUCTION FOR OIL-B'BL GAS-McF WATER-BBL CHOKE SIZE JGAS-OILRATIO TEST PERIOD ~' I ' . · FI0w. Tubing Casing Pressure . . CALCULATED : OIL-BBI. ' GAs-MCF WAT.ER-BBL OIL GRAVITY-APl (corr) ~ Press. 24-HOUR..... RATE i~.. ' 28. COR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · . . , , FEB 16 1983 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .. 29. 30. GEOLOGIC MARKERS FORMATION TESTS _ NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB Subsea Sag River SST 11880' 8737' Shublik 11899' 8752' Ivishak 12003, 8831, 31. LiST OF ATTACHMENTS 32. I her .~ s true and correct to tho host of my kno~led§o S ig nej;i,"r~'~.,~ .~ ~¢~ Title District Petroleu~ate ~//~~ - / J 'G, J! Pl~isaa INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ,"'. !~ '" '4 .:' I - r ' Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. · Item 5: Indicate which elevat on?::is used as reference (where not otherwise shown) for depth m~:~isurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump~ Submersible,. Water A~ STATE OF ALASKA (' .... ALASK IL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WELL IX] OTHER [] 2. Name of Operator SOHIO AT.ASWA PRTROT.RI]M COMPANy 3. Address Pouch 6-612, Anchoraqe, Alaska 99502 4. Location of Well At Surface.: 2078' NSL, 1704' WEL, Sec. 35, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) J 6. Lease Designation and Serial No. KBE - 76.98' AMSL I ADL 47472 12. 7. Permit No. 82-13 8. APl Number 50- 029-20709 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number A-20 (24-01-10-13) 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data PBU NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [~[ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] . Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals were perforated February 2, 1983, using Schlumberger 1 11/16" Hyperdomes at 4 s.p.f. A lubricator .was installed and tested to 3500 psi on all well work. 12010' - 12053' BKB 12070' - 12080' BKB 12090' - 12131' BKB (Ref. BHCS/GR, 3/5/82) ( ,, ) ( ,, ) An SSSV was set and tested in the ball valve nipple at 2150'. by c~y t~/~~/in 14. I here g is true and correct to the best of my knowledge. Signed ~,,-/-~~~ ~/ Title District Petroleum Engineer The spac~J:~elow for. Co~mission use Conditions of Appro'tm~, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate -, ~ STATE OF ALASKA ~_ ' ' ' ALASKA('"_ AND GAS CONSERVATION C~ MISSION MONTHLY REPORTUF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [~ Workover operation [] 2. Name of operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 82-13 3. Address' 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 50-029-20709 4. Location of Well at surface 2078' NSL, 1704' WEL, Sec. 35, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. KBE = 76.98' AMSLI ADL 47472 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. A-20 (24-01-10-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool · For the Month of February ,19 83 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud. date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests :14. Coring resume and brief description 15. Logs run and depth where run 16. DST data, perforating data, shows of H2S, miscellaneous data See Attached 17. I hereby c~rti~y that.,~,r6~6?~ng is true and correct to the best of my knowledge. ~ lc':. ~- .,, J/ , District S I G N E [~'~ ~.-~,~I~_'T" ( .~ ..~ ,~ ..~ TITLE Petro]_~um Rncl ~ n~=c,r DATE ~/{{/rZ NOTE~eport o'- n t~ f~rm is-requi;e~ ~or~ac~cal'endar mOnth, regardless of tho stalUs o;2perations, and must be filld in d4licato with the Alaska Oil and Gas Conservat~ommission by th~15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 PERFORATING DATA - WELL A-20 (24-01-10-13) PBU _J_ang. a.ry _30, 1983: February 2, 1983: February 7, 1983 February 9, 1983: February 10, 1983: Pressure tested tubing and inner annulus. Rigged up Schlumberger and perforated the following intervals using 1 11/16" Hyperdomes at 4 sPf: 12010' -12053' BKB (Ref. BHCS/GR, 3/5/82) 12070' - 12080' BKB ( " ) 12090' - 12131' BKB ( " ) Put well on production. Shut well in to prepare for static pressure survey. Ran static pressure/temperature survey at 8800' TVDss. Set and tested SSSV in ball valve nipple at 2150 '. Well on production. RECEIVED FEB 16 ]983 OiJ & G~s Cons, O~'n~ssj~,~ SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 January 17, 1983 Alaska Oil and Gas Conservation Commission 3'001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells A-20, A-21, E-12, E-13, E-14, E-19, F-15, R-16 PBU Gentlemen: Enclosed, in triplicate, are Forms 10-403, Sundry Notices and Reports on Wells, for the above-named wells. This contains our proposal to perforate the wells. (~'G: j..,~ P~isga ~. Distric~ Petroleum Engineer GJP:JLH:lh Attachments cc: J. D. Hartz Geology Well File #17 JAN 1 9 ]983 Alaska Oil & Gas Cons. Commission Anchorage (~ STATE OF ALASKA O{rM ALASKA OIL AND GAS CONSERVATION C "MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator 7. Permit No. SOHIO ALASKA PETROLEUM COMPANY 82-13 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50- 029-20709 9. Unit or Lease Name 4. Location of Well At Surface: 2078' NSL, 1704' WEL, Sec.35, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 76.98' AMSL 6. Lease Designation and Serial No. ADL 47472 Prudhoe Bay Unit 10. Well Number ... A-20(24-01-10-13)PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated February/March,' 1983, using Schlumberger 1 11/16" Hyperdomes at 4 s.p.f. A lubricator will be installed and tested to 3500 psi for all well work. 12010'-12053' BKB (Ref. BHCS/GR 3/5/82) 12070'-12080' BKB ( " .) 12090'-12131' BKB ( " ) An SSSV will be set and tested in the ball valve nipple at 2150'. Subsequent X:Vork ~eported Form No.t~ Datea A//Lt.~, JAN 19 !~ 14. I here cer if¥ that the fo going is true and correct to the best of my knowledge. Sig ~ , Title District Petroleum Enqineer Date Th e~pa~e b~low f,~r ~om m ,ssion us~ Gas Cons. Commission Conditions of Approval, if any: Approved Copy Returned BY LON~I£ C. SMITIi /-zo,-~ ..~ By Order of Approved by CQMMISSlONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 April 6, 1982 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 9950~ Attn: Mr. C. V. Chatterton Gentlemen: Well A-20 (24-01-10-13) Enclosed, in duplicate, is Form 10-407, Completion Report, for the above-named well together with the Well History, Well Logs, and Directional Surveys. This well has been completed as an~unperforated oil well. RHR:ja Enclosures cc: Well File #17 Geology Yours very truly, R. H. Re±ley District Drilling Engineer  STATE OF ALASKA ~ ALASKA ,_ AND GAS CONSERVATION C°,i.ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG_ 1. Status of Well Classification of Service Well OIL [~ GAS [] SUSPENDED ri' ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number - ' Sohio Alaska Petroleum Company 82~13 3. Address 8. APl Number Pouch 6-612, Anchorage, Alaska 99502 50-029-20709 4. Location of well at surface 9. Unit or Lease Name 2078' NSL, 1704' WEL, Sec. 35, TllN, R13E, UPM (¢~r Prudhoe Bay Unit At Top Producing Interval top of Sag R. SST. VERiFiED I 10, Well Number 1074' NSL, 1490' EWL, Sec. 01, Ti~N, R13E, 'UPM Surf. ~ A-20 (24-01-10-13) At Total Depth ~,~" 'B. H. ~- ' 11. Field and Pool 291' NSL, 1851' EWL, Sec. 01, TI(I~N, R13E, UPM ' Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe 0il Pool KBE = 76.98' AMSLI ADL 47472 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 2/8/82 3/4/82 3/11/82I feet MSL one 13034'MD 9570'TVD 12991'MD 9546'TV£YE§~ NO[] 2150 feetMD 2085' 22. Type Electric or Other Logs Run · GR/SP/DIL/BHCS, GR/FDC/CNL/CAL, CBL/VDL/GR/CCL, Gyroscopic Survey 23. CASING, LINER AND CEMENTING RECORD , SETTING DEPTH MD · CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 2'0"x3.0" Insulated ConductorSurface 110' 36" 8 cu.vd.~, con~_recm_ ' ' 13 3/8" 72# L-80 Surface 2745' 17 1/2".3720 cu.ft. Permafrc~t II 9 5/8" 47# L-80 Surface ... 11893' t2.~1/4" 15.81 cu.ft. Cla.~.~ G; "' 130 cu.ft Permafrcst C 7" 26# L-80 11409' 13034' 8 1/2"I 630 cu.ft. Class G ~/18% salt 24. Perforations open to Production, (MD+TVD of Top and Bottom andr, 25. TUBING RECORD - interval, size and number) SI'ZE, DEPTH'SET (MD) PACKER SET (MD) None 3 1/2" 11475' 11356' . 26. ACID, FRACTURE, CEMENT. SQUEEZE, ETC. .~ . · . : DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED ,' . . 27. pi~O'DucTi'bN 'T~sT ." Date.First. Product .on I Method of Operation (Flowing, gas Ift, etc ) ' . . ,, . · ' .) - . .... , .. . '. ,, , , . .~ ~' ·, ' ;, , . · .. , I Date of Test Hours Tested PRODUCTION FOR Gl L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO ,,. TEST PERIOD ~ - r Flow Tub,.ng Casing Pressure CA'ECULA~ED' 0iL-SBU GAS'~Mc'F' WATER-BBL OiL GRAVITY-APl (corr) r :28. CORE DATA " · , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chipsl .. ~ . ?,,~ . .~, · , None Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS .... NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. BKB Subsea Sag River SST. 11880' 8737' Shub lik 11899 ' 8752 ' Ivishak 12003 ' 8831 ' 31. LIST OF AT-rACHMENTS Well History, Well Logs, Direc~%ona] Survev 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~~~~stri.ct DrillingDate ........ .... R.H. ReJ.ley Engineer INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate wh:i:ch elevation is used as reference (where not otherwise shown):~.~or depth measurements 'given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing,. Gas Lift, Rod Pump, Hyd'raulic Pump, Submersible, Water in- i~:i:C t:i c.. ~'.,, 117 ::i WELL A-20 (24-01-10-13) WELL HISTORY Spudded well at 1600 hours, February 8, 1982. Drilled 17 1/2" hole vertically to 1537'. Directionally drilled to 2745'MD (2700'TVD). Ran 70 jts. 13 3/8" 72# L-80 Buttress casing to 2745'. Cemented with 3720 cu.ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to 2694'. ~ Tested casing to 3000 psi, okay. Drilled out to 2756'; ran leak-off test to 0.68 psi/ft. gradient. Directionally drilled 12 1/4" hole to 11900'. Ran 311 jts. 9 5/8" 47# L-80 Buttress casing to 11893'. Cemented in two stages: First stage with 1581 cu.ft. Class G cement; second stage through D.V. packer at 2705' with 130 cu.ft. Permafrost C cement preceded by Arctic Pack. Cleaned out D.V.; tested casing to 3000 psi, okay. Cleaned out float equipment and directionally drilled 8 1/2" hole to 13034'. Ran open hole logs. Ran 41 jts. 7" 26# L-80 IJ4S liner to~t3034'. Cemented with. 630 cu.ft. Class G cement with 18% salt. Cleaned out to 12991'; tested casing to 3000 psi, okay. Changed well over to NaC1. Ran CBL. Ran 349 jts. 3 1/2" 9.3# EUE 8rd tubing to 11475'. Landed tubing with ball valve at 2150'. Installed and tested tree. Displaced tubing to diesel; set packer at 11356'. Tested tubing to 3500 psi, okay. Released rig at 2400 hours, March 11, 1982. Eastman l Whipstock A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTIONAL SURVEY SO'ElTO AT,A.~XA PF, q"RQT,I:qTTM C'Q COMPANY JOB NUMBER A0382G0419 Pad Ar Well f~umber: 20 WELL NAME Prudhoe Bay,, NOrth SloPe, A~aska LOCATION TYPE OF SURVEY /,% Gyro Multi Shot 18 -Mar -82 SURVEY BY A ~ickman CONFIDENTLY' OFFICE Alaska Eastman Whipstock APE TFiOLANE COMPANY March 23, 1982 P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 34~4617 SOHIO ALASKA PETROLEUM CO. Pouch 6-6112 Anchorage, Alaska 99502 Well Number: A--20 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Gyro Multi Shot Date: ~8-Mar-82 Method of Computation: Radius of Curvature Surveyor: A Hickman Job Number: A0382G0419 Attn: Gary Plisga Dear Mr. Plisga, We are enclosing the original and sixteen copies of the Gyro Multi Shot Survey run on the above mentioned well. To date, the following distribution has been accomplished: A;''~I copY:telecopied to E/W North Slope office for delivery to SOHIO field representive~.. B;''16 copies delivered to drilling for in-house distribution. C;'~'~3' copies for E/W permanent well files. We wish to take this opportunity to thank you for calling on our services and we trust that we may continue to serve your needs in the future. S~cerely, SHYAM TALWAR District Operations Manager ST/bb cc: file enclosure Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide SOHIO ALASKA F'ETROL. EUM CO SEC, 35, TllN, R13E, U,M, KELLY BIJSHING ELEVATION: PRUDHOE BAY, NORI'H SLOPE, AI.ASKA GYRO NO:,.,.~.~, CAMERA NO: .1648, 90 DEG A/U NO: 1110 FORESIGHT: S8~ 40E VERTICAl. SECTION CAI. C. UI.ATEX? ~N F L.AN~,O.F RECORD OF' SURVEY RADIUS OF' CURVATURE METHOD PAD A, WELL NO: 20 GMS JOB NO: AO382G0419 TIME DATE SEC~--'35~--TI'~N~ ..... R1SE", ...... i';~*'M~ KELLY-*BUSHING-EI:EVAT'~ON~--76"~98 .............................. 09:-45~16 ....... 2J-MAR-82 .......................... TRUE HE~SURE'D--DR~FT ...... DR{FT ......... COLIRSE.-.VERTtCAt:~.VERTICAI: ........ SUBSEA ...... R--E-C'--T-' A N G L! L A R C [. 0 S U R E -DOGLEG DEPTH ANGLE DIRECTION LENGTH DEF'TH SECTION TVD C 0 0 R D I N A T E S DISTANCE DIRECTION-SEVERITY FEET D M D FEET FEET FEET FEET FEE]' FEET D M DG/100FT O, 0' 0 0 0. 0.00 0,00 -76.98 0,00 0,00 0,00 100+' 0 ]5 S 51 E 100. 100.00 0,20 2~,02 0,14 S O.J7 E 0.22 ............ 200'~ .......... 0-45 ........ S ....'2 -W ..................... J O0, .... 200,'00 '1'"~'0'4 ........... 'J"-23-', 02 .................. 0-, 90-S ..... 0,52 E I . 04 ~00, 0 45 S 19 E 100, 299,99 2.27 223.01 2.19 S 0.71 E 400, 0 ~0 S 29 E 100~ ~99,98 ~,~5 J25,00 3.18 S 1.1.., ~ E 500, 0 45 S 45 E 100. 499,97 4,4~' 422,99 4.05 S 600, 0 45 S 49 E ]00 ..,99,97 .,,66 ~,99 4,9., S -700~ ........... 0-"'~0 ........ S'--36 -"E ~ O0, 699~96 ................... 6,-72 ................... 622--,-98 ................. 5,75--S .... ~-, 800, I 0 S ~4 E 900. 0 45 S 25 E 1000o 0 0 0 ] 100. 0 0 0 1JO0, 0 15 S 6 E ]400, 0 15 N 82 E 1500, 2 0 N 62 E 100. 1600. ~ 0 N 66 E JO0, ..... 1-'7'00: ........... : ...... ~'"'45 .... N-89 E 'JO0. 18000 ~ 45S 2S W 100. 1900, 10 0 S JJ W 100. ]. O0 · 799,95 8,02 ">~ 7.-- .~ o 97 6,82 S 100, 899.94 9,54 822,96 8.15 S 5.00 E 100. 999,94 ....... 10o 19 ~'~ 9,~--.96 8.74 S 5.28 E 100. :t. 099.94:: .......:':%'~0.~,::i~9~!: :l::02~2 ~:~67.:: ~ 8 · 74 S 5,28 E 100. J2~,~4 5,~2 E ]0O' ] 399.93 5,6S E 1499.91 7. 1599.8:1 11,66 1522.8~ 7.12 S 1:1, ]699~7S ........... 12-~-77 ..... J622v75 ............. 6-22 S 15. 1799,61 16.79 1722.6~ 9,58 S 17. :1898,84 25,07 1821,86 20,94 S 14, 81E 4.44 S 76 E 5,67 S 50-E 6-,-73'-S 25 E 8.03 S 49 E 41 E 43 E 69 E 00 E 9.56 10,21 10,2:1 10.40- 10.79 11.16 0 0 0.00 S 5J 0 E 0.25 S--29-5t--E ...... 0,63 S 17 58 E 0,27 S 19 54 E 0.27 24 2 E 29 12 E '31 20--E ........¢. :9 31 56 E 0.50 S ~1 33 E 0,28 S 3J 8 E 0,75 S 3:1 8 E 0.00 .S-30--~4 E 0,25 S 29 SS E 0,0:1 S S0 19 E 0.~6 S S9 4~ E :1 ~77 S 58 S E 1.01 S-68- 2 E 1-,55 S 6:1 34 E 4,74 S 33 45 E S 15 7 E 3. S 9 54 E 2.¥7 S 12 11E 3,94 S 13 59 E 3.00 ............. S 15 13 E 2.25 S 16 6 E 3.00 S 16~4J E .-4.03 S 17 7 E 1.14 S 17 49 E 5.51 11.73 13.44 16,63 20.11 25.19 2000, 12 45 S 5 W :100. :1996,86 40,77 :1.919.88 40.40 S :10, 2100, 14 15 S 6 E 100, 2094,10 61.41 2017,12 6~.71 S 1.1.. ..... 2-200~ .......... 1'6 ....... 0 S .... 1'6 E 100, 21'90.63 ............ 86','3:1: ....2':1'1"3'~'65'~ ......89.29 S' t6. 2300, 19 45 S 20 F :100. 2285,79 :1.16,51 2208,8:1 118,47 S 2400 ~- 45 S 20 E 100. 2J78,98 152,58 2302,00 152,53 S 37. 2500. 25 0 S 20 E 100. 2470.4:1. 192,45 2593,43 :190.56 S 2600, 28 0 S 20 E 100. 255~.~0 2~,~] 2482,~2 ?~2.48 S ~7, 91 12 09 57 96 E 81 E 07 E ~'~-2700': .......... 32 ............ 0 ....S'-19"E .... 100,'2646',48 ....... 286~'0S ..... 2569~'50 ..... 279.60 S · 83.75 E 2800. 33 0 S 20 E 100. 2730.82 339,14 2653,84 330.25 S 101.69 E 2900. 38 0 S 24 E 100. 2812,21 396.85 2735.23 384.06 S 123,43 E E 41.85 E 64.67 E '90,73 E 1.21,20 157,18 ~97.47 241,96 '291,88 345.55 40~.41 PAD A, WELL NO; 20 GMS .lOB NO; AO382G0419 S EC~ ~-'-3'5~' ...... TI'I'N'~ ...... R 1"3 E'~ ! ~ T M'~' ........................................................ K E K[Y-B[!S HING-F.£TE VA TION': ...... 7 ~7~98 ' , TRUE ME'A~S'DRED-DRIFT ............ DRI'FT ............ COUR~SE'"VERTIC~'L---VERTICDE ....... SUBSEA ........ R E C T A N DEF'TH ANGLE DIRECTION LENGTH DEF'TH SECTION TUD C 0 0 R D I FEET D M D FEET FEET FEET FEET FEET 3000, 39 SO S 26 E 100, 2890,19 459.34 2813,2]. 440.79 S 3100o' 42 0 S 28 E 100. 2965.94 524.59 2888.96 498.94 S .... 32'00-~ ......... 4~3 ...... 0 .......... S'-'-'30~-E ....................... I"O0'i .......... 3039:~ ........ ~92:-I-4 .......2962'~'8-9 ............. 558,03 S 3300. 45 45 S 30 E 100. 3111.14 662.03 3034.16 6]8.59 S 3400. 47 30 S 29 E 100. 3179.82 734.70 3102.84 681.85 S 3500. 48 15 S 29 E 100. 3246.89 808.86" 3169.91 746.72 S 3&00. 48 15 S 29 E 100. 331~.48 883.45 3236.50 8].1.97 S ~7'0'0'~ ............ 4'8'--'30 ..... S"29E ~-00'; .... ~'~79Y90 ......... 958T20 .......... 3'~02~-92 ....... 877~5 S 3800. 48 45 $ 29 E 100. ~446.00 10~023 3369.02 942+98 S ~900. 48 30 S 29 E ]00. ~512.10 ]108.26 ~4.~.].2~ ]008.61S 4000. 50 0 S 31E 4100. 50 15 S 31E 4'200'~ .......... 51 .... 15 4300. 50 45 S 31E 4400. 50 0 S 3]. E 4500. 50 0 S 31E 4600. 50 0 S 31E 5 . ].074.21 S 100. :3.77 38 ],183.97 13500.40 100 ~Y6Y~ 6~ 14 ~61~0 ~ 71 :J 2Y2~ 28 S 8Sl ~ 46 ::::~11~:~8~ ~0 S 100. 3895.74 ] 568.95 : ..... '- 100. 3960.02 1645.47 3883.04 ]469.63 S TIME DATE k A R C C 0 S-U' R-E ....... DOGLEG ' S DISTANCE DIRECTION'SEUERITY FEET D M DG/IOOFT ~49.88 179.51 212.26 247.23 283.02 3!8.98 355.~5 427.77 464.].5 502.02 54].55 582.01 622.61 662.29 E 465.57 S 18 47 E ]..95 E 530.25 S 19 47 E 2.82 E 597~03 .... S-'20-50--'E ...... 1-.68 .... E 666,16 S 21 47 E 2.75 E 738.25 S 22 33 E 1.89 E 811.99 S 23 8 E 0.75 E 886.24 S 2:3 37 E 0~"~ E .... 960:69 ..... S-'--24 ....... 3'-E ......... 0 .5 E 10~5.47 S 24 24 E 0.25 E ].110.28 S 24 4~ E 0.25 E 1185.7~ S 25 3 E 2.13 E 1262.09 S 25 25 E 0.25 E 1~9.11 S 25 46' E ]:.2iS E 141iS.46 S 26 5 E 0.92 E 1493.21 S 26 20 E 0.75 ---4700: ....... 49--' 45 .... S' '-3 :l E l'OOJ- .....4024 ~'-4 7 ......... :1172I-'-;-'83 ......... 3947 ';49 .... 1535 ;' 17: S 4800. 49:30 S 30 E 100. 4089.25 1797.95 4012.27 1600".81 S 4900. 49 30 S :30 E ]00. 4154.19 1873.95 4077.21 ]666,'66 S 5000. 49 30 S :30 E 100. 4219.14 ]949.95 4142.J& 1732.52 S 5100. 49 30 S 30 E 100. 4284.08 2025.96 4207.10 ]798.37 S .... 5200--~ ........ 49-' 15 ..... S-'-30" E ........... 1 O0 ~ ............. 4-~"49'-~-"1-9 ...... 2]'0t':'-81 .......... 4'272"~ 21-'''] 864,10 S 5300+ 4~ 15 S 2~ E 100~ 4414,47 2177,55 4~37~4~ 1~30,0~ S 5400, 4~ 0 S 2~ E ~00, 447~,~ ~..~.~,16 4402,~ J~6,17 S 1045,21 5500, 4~ 15 S~o~ E 100, 454~S5~, 2328,76 4468,37 ~?062,S0 S ~08J~87 5600, 4W 15 S 2~ E 100~ 4610,~ 2404,51 453~,65 2128,56 S 11~8~60 ..... 5'YOO"~ ........ 49 ..... 1'5 S--'28- E 100~ .......4675'~'~0 ...... 2480-~--27 ..... 45~8-~-~2 ........2J_~5~ 14 S -' lJ 54~ 75 5800, 48 45 S 28 E 100, 4741,5J 2555,74 4664,53 2261~77 S 1~0~J. 8 5~00, 48 15 S 28 E lO0. 4807,77 2630~6~ 47~0,7~ 2S27~0 S ........ ................................... ......................................: 701.74 E 1589,57 S 26 33 E 0,00 74].]9 E 1645.96 S 26 46 E 0,00 780,57 E 17~.'~ S 26--57 E 0.25' 8~9.24 E ]798.26 S 27 6 E 0.80 857.26 E 1874.21 S 27 13 E 0.00 895.28 E ]950.16 S 27 20 E 953,30 E 2026.12 S 27 28 E 0,00 971.25 E' 2101.95 S 1008.~ .~. E 2177.6IS $ 27 ~5 E 0.76 E 225:3.25 S 27 38 E 0.25 E 2:328.85 S 27 4] E 0.25 E 2404.59 S 27 4~ E 0,00 E2480,33 S"27--45'-E ..... 0,76 -'- E 2555.80 S 27 4~ ,., E 0.50 1225.~4 E 26~0.70 S 27 46 E 0.50 F'AD A, WELL NOI 20 GMS --SEC~;--35')--T'I'IN'-~'-R'I~3E-'~' ...... U-;-M. JOB NO; AO382G0419 TIME DATE KEL[:Y'-"BUSH1NG-EI:EUAT~tON',* ....... 7'6-~98 ...................... 09: 45: 16 2J-MAR-82 TRUE · bt'EASURED--"DR-IFT ........... D-R~tFT ......... COURSE-VERTtCAt~-VERT-ICAt: ...... SUBSEA R.-E~,-C-T-A N G U L. A R C L. 0 S U R E DOGLEG, DEPTH ANGLE DIRECTION LENGTH DEF'TH SECTION TVD C 0 0 R [J I N A T E S DISTANCE D~RECTION' SEVERIT' FEET D /4 D FEET FEET FEET FEET FEET FEET D H DG/iOOF' 6000, 48 15 S 28 E 100. 4874.56 2705·24 4797.58 2593,77 S ]260.~6 E 2705.50 S 27 46 E 0.00 6100,' 48 15 S 28 E ]00· 4~40,95 2779.84 48&~.~7 245~,65 S 12~5.~9 E 277~.~ S 27 46 E 0,00 ....... 6'200~ ....... 48--~5 ....... S--2'7-E .......... ~00~ ...... ~0'0~'-2] ..... 2854-~"7~ ..... 4-930'~'~3 ....... 25~'6-~"08""S ...... 1~2~,97 E 2854,80'' S'-27--46"-E ............ 0,'~0 6300. 48 45 S 27 E 100· 5073·14 2929,90 4996·16 2593·07 S 1364.J0 E 2929,98 S 27 45 E 0.00 6400. 48 30 S 27 E ~00· 5~3~,24 ~004·93 5062,26 2659,93 S 1398017 E ~005.02 S 27 44 E 0.25 6500· 47 45 S 28 E 100, 5205.9~ 3079.38~ 5129·01 2725,98 S 14~2,55 E 3079·47 S 27 43 E ~,06 6600. 47 ~0 S 28 E 100, ~ ~ .,~73,39 3153.26 5~96 41 2791,20 S 1467023 E 3153,35 S 27 44 E ~5 ......... 6-700'~ ..... 4'D'-"15 .......... S'"'-"2 9'-"E ............ :J-O0'~ ......... 5~4'1'-~--i'1 .......... 3°° ....... 5o .... ~ ..... o ~ .- = o . ~6,83 ~ ~ 64 · t. -~.~5~ ~87"--S - 'i.~O~ · 34 E S226 ,-92 $" '27'-- 4'5"-'~ ........ ~ · 2'8 .... 6800, 47 0 S 28 E 100. 5409,15 3300,1~ .,332,17 ~920,~7 S 15~7,31E 3~00.20 S 27 46 E 0,77 6900, 47 0 S 28 E 100, 5477,~5 3~7~.,25 .400~ ,~7 2984·84 S 1571,65 E ~37~·~ S 27 46 E 0,00 7000, 47 0 S 29 E 7100, 47 30 S 28 E ......... 7-200: .......... 4'-7-----45 ...... S'---2&---E- 7~00· 48 45 S 25 E 7400, 50 0 S 25 E 7500, 52 0 S 25 E 7600, 53 15 S 24 E 100, .... ~4~·55 ~446·38 5468o~- .,7 3049,12 S ]606.54 E ~446,46 S -~7 47 E 0.73 100:;:~ ~5613 4 3113 65 S 164] 58 E . · · .... ~19 89 S 27 48 E ~ · ~ ........ '~'/:~_.,,:,,~,.~ ...... ::~. ' ~. ~ 2 .... 100:,:~. 680 ~ ]~7~9:,~A7 :S:~ ].o7o E JO0;.~::~; 5747.41 ,43 ,~24~,80<S 1707,24 E ~' ~7~9 31 E ~744 11 S 27 41 E J. 25 100.,:.. 812,.,.; , 100, 5875,45 ~821,57 57~8~,~4'~::.:..~3.8:6:,:~02"~S 1772.15 E ~821,74 S 27 ~8 E 100 5~6,15 ~00.87 .,8~9,J7 ~458.33 S 1805.11 E ~901.09 S 27 34 E J.48 ....... 7'700~ ....... 5~'-'45 ....... S'--2~"E ........... t00· .99~,,64 ~980~-99 '-.,918066 ....... ~3~-~05'-"S J837,16 E ~981 27 S 27 29 E' 0'~-95 ...... 7800, 54 ]5 S 25 E 100· 6054·4] 4061.67 5977.43 3605'°95 S 1870,06 E 4062.02 S 27 25 E 1·69 7900, 54 15 S 25 E J. O0· 6112·84 4142.70 6035,86 3679.50 S 1904·36 E 414~,11 S 27 22 E 0,00 ? _ 8000· 54 0 S 25 E 100, 6]7].44 4223·6] 6094,46 3752,94 S J. 938.61E 4224,07 S 27 19 E 0 8100. 53 45 S 26 E 100· 6230,40 4~04o29 61"3·42., 3825.85 S 197~.38 E 4304,80 S 27 17 E 0.85 8'200~ .......5~"--'45 ........ S'-"26'E ............ 100~ ......... 6289,'53 ....... 4384,--88 ..... 62't-2~-55---'---~898,-33.S 2008,73 E 4385,43 S 27 16 E .. 0-,00 ......... 8300, 53 15 S 26 E 100, 6349·01 4465 ~1 6272,0~ 3970 58 S 2043 97 E 4465 79 S 27 14 E 0 50 8400, 52 ~0 S 26 E 100· 6409·~6 4544,88 6~32·38 4042,24 S 2078,9~ E 4545·51 $ 27 1~ E 0,75 8500, 52 0 S 27 E J00· 6470,58 4627092 6~9~.60 4~13,00 S 2114.20 E 4624,57 S 27 12 E 0°94 8600, 51 0 S 26 E 100, 65~2.84 4702,14 6455.86 4183.04 S 2149.]2 E 4702.82 S 27 12 E ...... 87'00"~ ......... 50"--30 ..... S-"-27'E' 100'~ ..... 6596,10 4779~.~.~ .... 6.,1~3 ..... 4z.~-,34 S ~J83,'68' E 4780·25 S 27 11 E 8800· 51 0 S 27 E 100, ~65~,37 4856·97 6582,39 4321·~4 S ,.._~°18,83 E 4857,6~ S 27 11E 8900, 51 0 S 27 E 100, 6722,~1 49~4·67 6645,33 4390,58 S 2254,11 E 49S5,41 S 27 11 E 0000 PAD A, WELL NO; 20 GMS dOB NO: AO382G0419 TIME DATE TRUE ME~SUR'ED--DR~FT-~-~-DR~F'T ......... COURSE"'~VERTICAt:'VERTIC~E ......... SUBSE'~ ..... R--'E-C'-T-~'N'~G'U LA R C L 0 S U R E DOGLEG DEPTH ANGLE DIRECTION [.ENGTH DEPTH SECTION TVD C 00 R D I N A T E S ~ISTANCE DIRECTION'SEVERITY FEET D M D FEET FEET FEET FEET FEET FEET D M DG?lOOFT ~000, 5030 S 27 E 100, 6785,58 50J2,09 6708,60 445~,58 S 2289,27 E 5012,84 S 2710 E 0,50 9100,' 5015 S 28 E 100, 68490~5 5089~1J 6772,37 4527,90 S 2J24,84 E 508~.87 S 2711E 0,81 ~ ...... ~200~ ......... 5'0 ..... 0 ....... S-'28-E ........................ 100"~ ......... 6~13~46 ....... 5J:6'5'~86 .......... 68S6"~8 ........ 4595'~'67~"S 2J60',87 E 5~66,61 S 2711E 0,25 9300, 4945 S 28 E 100, 6977,~1 5242,32 6900,9J 4663,18 S 2J96,76 E 5245,06 S 2712 E 0,25 9400, 4930 S 27 E 100, 7042,69 5JJ8,50 6~65,71 47J0,75 S 24310~4 E 5JJ~,24 S 2712 E ~500, 49 0 S 28 E 100, 7107,~7 5~94,24' 7030,99 4797,95 S 2466.92 E 5395,00 S 27 15 E 0,91 · ~600, 4830 S 28 E 100~ 7175,90 5469,4~ 7096,92 4864,33 S ~.....~.~no0..?l E 5470,17 S 27 15 E 0~.0 ..... ~700~ ......... ~8 ....... 0 ...... S~-29-~E ................. I'00~ 7240~'495544~'05 ......... 7~1-63-~5·t-:--4929~89-S ..... 2557~SJ'·E 5544'~76 S2714'~E .... 6 ~0 9800, 47 0 S 2~ E 100, 7508,04 5617,75 7231,06 4994,38 S 2573,56 El ~6185 ,45 S 2716 E 1,00 ~9000 46 30 S 29 E 100, 7576,56 5690,~,8 7299,58 5058,08 S 2608,87 E 5691,25 S 27 17 E 0,50 ~ 10000, 46 0 S 30 E 100, 7445.7J. ~,76~,80 7568,7~ 5120,95 S 2644,44 E 5763,44 S 27 1~ E JO100, 45 30 S 30 E 100' :: 751~ ~8 .......... 26 · 27 21 ~,]82,98 S 2680, E ~ ~8~4 99 S E .... ~'0200-~ .............. 44"-30 ...... S-30---E' 100'i -~ ' ~9 10300 44 0 S 29 E 100:~: :!:::7657 83 59:~o~.:::?::7580,85:::,:::: :: ..... :5304 , 95 :::S 2:749~97.~...: E 5975,36 S 27 24 E 10400, 43 45 S 29 E ].00, : YY29,92 604:4 2:783:,5Y E 6044,6~ S 2Y 25 E > ............................................................................. : : ,. :: < : : ' · , . , ; , : 10500, 43 0 S 29 E 100, 7802,6J 6112,79 25:,'.&4;./S 28J6,87 E 6113,29 S 2726 E 0,75 10600, 43 0 S 28 E 100, 7875,74 6180,99 7798,76 5485,57 S 2849,41 E 6181,47 S 27 27 E 0,68 ~'-']0700~ ......... 42-'30 ...... S-~'28'--E .......... 1'00"i .....7949,17 6248,87 787~,19 .~4o,~0 S 2881",28 E 624935 S 2727 E 050 10800, 43 0 S 27 E 100, 8022,61 6~16,74 7945,63 5605-,71 S 29]2,62 E 6~]7,2~ S 2727 E 0,84 ~'10900, 4330 S 27 E 100, 8095,44 6385,25 8018,46 5666,76 S 294~,73 E 6~85,74 S 2727 E 0°50 11000, 44 0 S 25 E 100, 8]67,68 6454,34 8090,70 5728,91 S 2974,04 E 6454,87 S 2726 E 11100° 44 0 S 23 E 100, 8239,6] 6523,62 8~62,63 5792.37 $ 3002,29 E 6524021 S 2724 E -~1d200'r .......... 44 ........... 0 .......... S-"2~"-E ........ 100, .... 8311~,-55 ..... ~ ~ .... o .... 6.,9~.-~-8] ......8z~'4,.,7-'5856',31' S ..... 3029'~'43 E' 659~,47 S 2721 E 0,00' i 11300° 44 0 S 22 E 100 8383,48 6661,93 8306 50 5920 49 S 30.6 02 E 6662,69 S 27 18 E 0 69 : 11400° 4330 S 22 E 100, 8455,72 6730,68 8378,74 5984,61S ~081,92 E 6731°55 S 2715 E 0.50 11500. 43 0 S ~1E 100. 8,..~8, 6798.74 8451 57 6048 36 S 3J07,03 E 6799 73 S 27 11E 0.85 : Jl&O0, 42 0 S 21 E .100, 8602.28 6865.77 8525,30 &lllo4; S ~131.24 E 6866°89 S 27 8 E 1°00 -t~1"700': ............ 4"t ........... 0 ....... S'-20'-E 100, 8677'~17 69~J"i44 ..... 8'600'+-i9 ........ 617~',49'S ....... 3]54'*'45-"E'-69~2,71 S 27' 4 E ].,20 ~ 11800o 40 30 S 20 E JO0o 8Y52,93 6996,05 86Y5,95 6234,8~ S 3JY6,YY E 699Yo50 S 2Y 0 E 0,50 JlgO0o 40 0 S 19 E 100, 8829.25 Y059o92 8Y52,2Y 6295.Y4 S 3198,~4 E 7061,56 S 26 56 E 0,82 0,88 0.50 ]o00-~- 0,86 0.25 .~'~J.; A, WELL NO; 20 GMS JOB NO; AO~82G0419 TIMF. [;ATE , TRU~ ~MEASURED~DR~t~'F~T~ ............. DR-I~F~T .............. COURSE-~VER~TICAi~ VERT~)~CAI: ........ SUBSEA .......... R~-E-'C~'--T'-~A~'~N~-~G-U- L A'R C L 0 S U R E DOGLEG DEPTH ANGLE [;IRECTION LENGTH [;EPTH SECTION TV[; C 0 0 R [; I N A T E S DISTANCE DIRECTION~'SEVERIT~ FEET D M D FEET FEET FE-EI' FEET FEET FEET ~; M DG/1OOFI 12000. 40 ~0 S 20 E 100, 8~05.58 7)2~,80 8828,60 6J5~,84 S J21~,~1 E 7125,64 S 26 52 E 0,82 1~100,'~ 42 0 S ~ E 100, 8980.76 7189,21 8~03,78 6418,19 S ~24~,54 ff 7191,2J S 26 49 E 2,00 ...... t~00.°° ................................ 4~ ~0 S ~'~ E 100, 90:,4.1~= ............. J2~OOJ 47 0 S 24 E JO0~ ~124~58 Yg2Y,41 ~04Y~60 12400, 48 30 S 24'E 100. 919J.82 740J,24 9J14,83 6614,11 S 3~26,81 E 7403.66 S 26 42 E 1,50 ~2500, 50 0 S 25 E 100. 9257.0~ 7476,8~' ~180.~J 868~,04 S 3~58,2~ ff 747~,~5 S 26 41 E 1,68 12800, 50 ~0 S 28 E 100, 9~2~..0~ 755~.64 9244.05 6752~44 S ~1.3~ E 7556,22 S 26 40 E ~2 12800~ 56 0 S 28 ~ 100~ 9419~60 7714.~6 9~62~62 6895~84 S g~6~2 ~ Y717~1~ S 26 ~0 : 2~6 ].2850~ 56 0 S 28 ~ ~0~ 9~67~6 7Y~6~01 9390~58 6932~4~ S 3~83~88 ~ 7Y~8.62 S 26 ~ ~ 0~00 TH~: FOLLOWING STATION IS PROJ:CT~[; FOR :NTERPOLATION VALUES FINAL CLOSURE - DIRECTIOn; S 2~ DEGS 42 ~INS 2~ SECS E D'ISTANCE"; 7~1J ~ 1-2 F~ET 1 I SOHIO ALASKA PETROLEUM CO. PAD.A (24.01. I0.13) A-20 Controlled Drilling Consu!tant s ~. ~S HENDERSON 349-3114 March 2, 1982 Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 STATE REs Magnetic Single Shot Survey Job No. 0282-006 Well A-20 (24-01-10-13) Prudhoe Bay Field North Slope, Alaska Date of Survey: 2-06-82 to 2-28-82 Dear Mr. Rose: Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot SurVey on the above well. The method used in calculating this survey was RadiUs of Curvature. The depth of the survey was 1480 to 11,820. Thank you for giving us this opportunity to be of service. YOurs very truly, Controlled Drilling Consultants Cecil Harrington Directional Supervisor !~::5~,..,Su,-'"'" CURVATURE 'C~',:PUTED F'OR CDC BY F,M LINDSEY CO~,i P U T'iA TI ~N ~ ASSOC,. ',- S ,'.. L' 20 ( 2 z.-:. K, ~ ELEV 76.98 T~ A"G c .~ L DEPTH SE'A DIREC . L C L 0 S.'U R E S" O R ~I"..'~,.'.T}:.. :.i TOTAL (OORDINATES D M ' $ DbG/IOOFT '. :.SECT:ION ' O t $TAr~C.~ 0 0 Ac, C,' '..v~3 V N ::0 .' OOE .:~: 0, O0 '$ 1663 3 30. , "662:.,.:82-:.'::..':1585,8~,.... N82.,OOE.!;:'~?... .... :. 2.87 ~7~7 "I 0'.'i,~L1756,T~. . 167'9o76. 5~O.OOW.'.' 0.60 I.~52 5 30 '":.?-'1~5:'~;",~15'6::::..:. 1774.58" $,?.O'"o..OOW:::'"':::""'.. '4.59 0.00 W .. 0.00 $ 0 0 0 W · . o o ow I ':15 :':: E:: : 2.00 ~ 35 0 0 E 6.75 N b4 46 29 ~ 8.33 ['~ 85 51 46 6 8.30 S 56 25 57 ~- O.O00 0.000 3.095 V · 799 2.660 '~-UO o. OO '0 '91 0.29 3.33 '. 7.28 J. kJ ...... "'" OO' 12 · .FA... 15 30 194,7,,. 59:, ....1870 · .~'5 ..... '"19~8. . ~:~_, ].5 205'9,04.' .1982. % '. : :~. . .. ~5 2:a...~:8.:.,.:~ 2 :::.:i:;.: 20~1 · ~ 5 ~./:.,:~.~ 78;.?~::0 4~:,.:,' .2 ~ o ~', I'/.~4 S ii I 49 ~ 27.80 S 3 45' 19 E 41.38 S 1 12 ,2 F_ .370 .75G i 40 53 E 2.540 3 19 35 E 1.763 5 39 17 E 72.33 S 89,20 S ~5 m 2307'.73 2230 · 30 239a,~+7 23!7. ' 'o" ....... 403 ':~ 75 522,00E 110.91 49 S2!.OOE ia2,09 53'::S2I'~':':00E'':'':'' 177.a3 17.06 E 29.35 E 42'91:E 112.21 5 0 ~4 b~ ~ 3.695 t4b,09 S Ii nO 15 ;-' 2.961 182.55 S 13 35'50 E 2.660 Si5 39 5 E 2. S 16 45 53 g 3.125 lOb.ii 139.~3 t 77 · 0 2:. 2791 '.' . . . ~5'' 2~O~'.oB ..... 2726.~5 S24.:00':"':'= .. 354.7~ $ 68,07 E: 191.86 EI 252.32 318.~8 372.15 2 g J'. ,. 3r, 7~ .... 38 ~0 4 45 2879,8B 2802,65 A5 2052,10. 287= 45. 3022,27 2945.99 · .. -. 3079.60 . . 527.00E z+. 07.78 S30.OOE. 460.60 S32.005 5~4-, .8~_ .. .. . . 137.79 166.46 i99.04 269,84 S':,F~GLE SHOT SURVEY 2 ~<.AR. .~2 RECORD OF SURVEY VERTICAL SUB DRIFT TOTAL COORDINATES DEPTH DOG LEG SEA DIREC ' , DEG, /~?"+9 aS. 3( 2¢341,!9' S32.00E.. 873.42 S a23,i2 E ~, ,"~4 50 1'5., .;669.99 532,00E' 1198,45 $ 62'6,22 E ~,506 50 0 3908.53 3831.55 SSI.OWE 1363.35 S-- 72'7,27 E 48'4 5787,24':"' 5710.26 5 5949".:62 5872.6a :;3 45 t'..620.g.,64 ' 6zZ7o36 · ','821 a.o 45' 4111.53 .'-,4034.55 SS!,OOE :-:,'1569.8! $ 529a z-9 i5:"4418,'72 ..... 434!,7~ . ................ =-:' ' ,' '"'" . . ,, ' _; S3!,0CT.:.:;~:1'878',ii S 5768 '¢9 ' '0'""].'>&728'~'9"i.<'.-~65~',o~ ...... 5-~-'OOE.C;'"'"":'2~86,r42 5 Z2,~,~7 ~ .. &a6'A ~? 0 '5~ag,Z~ ":5'~2,16 S3~.,OOE]']'.:':'' 26'3~,~2 ~ ~ ~ '-' Ao~ 46 ~0 55~7,6~ ~'4,~0,69 532.00E 2938.5~ S ~671.27 = 7348 S29,00E:':":::.Blg~,i1 S :821.22 E 760& 22B"ooE':<'S366,99 S !915.63 E C .L 0 S U R E S SEVERITY SECTiO,g DISTANCE AN'~LF DEG/iOOFT OiSTAhCE D M S 97C.51 S 25 50 fil E 0.321 969.99 -- lbaP.20 S 28 4 39 E 0.253 .,',1545.i7 i765.79 S 28 28 17 f 0.079 (:'.1785.64 2145.17 S 28 53 ~ E 0.i06 "21&4.73 2745°69 S 29 14 43 E 0019a ~742,72 3025.~7 S 29 2~ ~'i ~ O.lCo 302~.0v ~ - ..... ~---.T .............. ~ · : ................. ~3~iu.56 $ 29 37 ~b ~ 0.328 ~78.70 ~675.98 S 29 gl 55 g 0.704 3073.80 528,00E"'.::"'3667,~6 S 3,0. 64~2.'07. :'6355,09 S29°00E::.77:'.'"'.3933.,~9 S C '. 659:0'"~55'..'.."65!3-57 "'$28,00~'.'.i.:-..4110,26 S 15.......6889.,.35.. 6¢12'37..~ 62~,0~,., ~31,73 S 30 ;,0"0 61.60 $ 55,92:""",':S2~ 5074,40" $ .'5.':.:.~780~:'.~B':.',':.7730.~0 ' $2'~ .. . ",~..,-.,.~ .... 0 ::';"8"I'?:T,;0:3':";>".'80o6 o 05 ' :'" 5. 00..<.~ .... ~ 17 ..94 $ ....... . S22"0'0E]?!'563'?,'42 5 30 ."i'8~8'5:;8.~" .... 870°-85. Sz'z+',OOE'."':':...6!ooo.¢.u.'i .' =' =~ S' 851,33 E i0~6,57 E 207~ ~o 89 22~., 23i5.82 2a86.74-E 2658.46 E 2814.42 E .2930,58 g 3069e50 E 4516.76 S 29 26 i6 a 0.'369 4717,.76 S 29 23 52 E ' 0.,6',~3'' "" 54~s.~6 s z9 zo ~o ~ -' u.ST~ __58o2.6~ s 2~ o ~o ::: o.5~6 6071.97 S 28 51 29 5 G.661 6a!~o91 S 28 34. ~ ~ 0.~25 6960o40 5079.84 580!,17 ...... 8070.79 6418.22 - 66.40 _ FE~T AT S 27 43 43 ~' E. 3_.i~, :, :':' 1 , '_, A-20 SiNul ? SHOT SURVEY '"" -¢' ' FEET OF sUP_,,, .SEA-DEPTH" v'='.ASUqE3 DEoT~ AND OTHER DATA FOR EVERY s. VE,"4 ,i00 2 ;'{Al:), o TRUE ' VERT I CAL CORRECTION TOTAL' COORD,T. NAT~S ........ '"'77. lOC 0 0 0.00 $ !77 .~ 277 .... ' ' ':','::'277. -200 0 ., 0 0.00 S ?77 .......':".'; '"377 · 900 '~' ' ' i'0 ::';.':'.'l ::;.; i. :.'.. g: 0.00 S · .. "..' . ·... ,,-' '" · A'77 · ' AO0 ' '"' "" 0 '"" .";'.~'¢ ' 0 C · O0 S ., . ~7~.,. ......' 577. 5'''~.''' ": ': 0 "'..'"'i.'"" ,..,."' 0.00 $' 0.00 W O.O0 0.00 0.00 677 677 · 600 777 '"-'";: '..',!:'i'777. 700 877" ' ":' t.." '.'.:/,,: '!:! :877 · 800 · .' "97.`?· 900 c, ? 7 '.''..'.... ":', ': ...:.-..... . u77' .'..:. '.l.,":"' ..1~77" · .~ 000 '"77 "~" "':"::' 1 ! 77 · IlO0 · . g 77, :'." '.., ?.'?, 0 O,O0 S 0.00 W 0 O.OO S 0.00 ~,~ C . 0.00..,$ ::? ':.0.00 w 0 ~-"0,00 S 0.00 W 0 ""':"O.'o0':':S ""':'"":'" 0.00' W 1.277. *-. 200 0 .:-.~77 · i 3 ~,",, 0 1477, . 1400." : lE',."7 ."'" '1577, 1500 .,:.. '.;."0 ..: !,.677 ..:.. 1677. 1600 :' 0 · . · ' ""'~ ' 1'7'77, ' 700 ". "0 ' f .' r '. .* ' 0 0.00 S 0 0o00 S 0 0.00$ 0 · .. :..'. 1'77 3 2.~7 O O.Og · . 1977. 1900 ' 2 ...... 2077, 2000 4 . . . ..' .: · . '"' ~277:'~""' .... "2 '2 0 0" :"" "! :'12 ".'"'"':'".'2377,"" 2300 ..... zg. 2535 2477~ 2'~ 23,24 45.57 · "~:"," :'~".. '7 ! '"g -, . . ~ ......... ~ .... C ¢~l ~ 2577. 25'3'" '~ ~ ..... 9 ll -'-.'o ? 2077, ' ~ I ''' .x ...... ' ' 260n 54 ~ ~' Z'!~52 ...""277'7 ,, ;1700 7. ";:. ';' '7 g S 7'7 ,, 2 -.300 · 7 ,/4. Z" ;. ,, '.; .. 26 · .~ '~1 3i 260 . 48 3l~?7.. 3400 3577, 3500' 222,41 S 2 4'79, :52 S 646,82 S 740,Ii S 83 0.00 W 1,51 6,91 3,2i 6,04 2,49 0,9~ 42,31 60,18 80,56 i04,75E 136,'66~'E i7'7.4'2' 226,3~ 281.52 398,55 519,66 SEA DE-THo , ; TRUE 2C~TH · t' VERTICAL 'S..,,B ."MD=TVD DEPTH SEA .DtFFERFLNCE -,, , ,:,:, '. ]., "'., ', .', : :'.] :: :,.,.: ', V;-RT l CAL C 0 :-i R E C T l 0 N TOTAL COORDINATES ~Gl2 3677. 3600 468 3 ? 7 7 · 3_,7_¢_.0 ....... ~900 4177, 4i00 745 4277 · 4200 56 55 1127.5P; S 58i,9a t 33.!'. 12 S i L,'i', 84 14'32,91 $ 769,07 ..... %534'4:7 S $30,09 55 54 !635,95 & 891,07 1736~53 S 95i,50 5230 4377. 4300 ..... ."853 .. 5.536 4577° 4500 959 · . , "': A. f" 9 ...... /~6 77. /+.' 6 0 0 I012 54 53 53 0689 7035 '?~, ,02 ,. 7332 _,¢'000'' .1219 ........ · : ........... 5*~ .. 5~, th,:~ ' · ..,.,~,.,' 1269'.. ....~0 ":' ,:' ~, ,, .1'3,12, z~ 9 ~.. ~,, ...'' ,. .. . . 5300 ·1365.,: ..... ~7 5400 1412. ~7 5500 1458. a6 5500 ' "" =50~".. 47 5300"':::.!'555"":."'..' 50 , . . . 5~00' "15~0 55 ::.2528,11 S ; 42',_, .~z, :'.'.2623,9~- $ 147;,61 E '.:..'- .27 !8 o43S 1535.66 28!i.12 S !592.28 Fi 2902, ~, 2992 · .! 9 S ~_/_,~.:?~? .o ':.' .... ,., 1672 A 2 6~ CO 12n~ G7 63"JO' '1940 6400 ..2004 66 6& · '. .6277,. . . '"'' '6377,': 6~77., ...3085.6) S 17bO.O* E 3182,62 S 1815.37 32 · ..... 1~72,2~ .. --_~ ~ .................. --__ ............................................................................................. ;¢398.5'4 3 2932,40 E ' 5i5.1<~ S 199z*.z*3 E :.. 2,-63'3.'['3 S 2C'57.z~6 E ': 3753.50 S Z: 21,45 ~ · 3870,39 S 2i85,U;: 3c" °4 · 6. b S .... ' ........ ;- -'~ ' ._ _~.¢_~_? '_:~_~.: .............................................................................. 4095,16 S 2307.77 hZ 4204.13 & 2365,7'5 E 4 <-,_~._.-L(:::_o____.2.~.Z.3_o_O_O E__ 4418.1':..' S 2,z7').52 '.?: 4524.0U S 2~.:3~..',,b5 ;:: 46'27.84- 0 25,':;9,73 :.2 ......... 7?': 2 ': 7'. l'? "."-~:. % $6z,~2 . .................... · .... ;... :' .L ,.:, ? u,r'7:Tt, c..7~,.n 2.~..,/_. p ' 58 ': ': ~" ~ 77., 6800 '223~ 60 '7 7' .... ' .... '- ... 6'~r'O 22 . . · , 0 }'7., 70C'0 56 56 54 . .. CT--!ER :DATA FOR S I,~ _ .SHOT SUNVEY EVERY EVEN LO0 FEET OF SUB 'SEA DEPTH, F','~A?,. 32 ~PT? TRUE - V' ,.-':,VERT I,CAL · ' MD T. D, :-::_::.:., S ~,A.. D ~ F F,, R,,,,, iCE::!::.;.'.':', :":"'COR R EC T'I ON ._ TOTAL.' COORDINATES 972R 0.'..65 · 7 ,oo 5aa. :7177. 7277. · 7577. 10305 7677, 7600 !0a45 7777. 7700 10583 -.'':::" 7877,' 7~00 ' "' '.7977, .7990 · . ~ .... ,,. 807,V,. 8CO,~.~ · . 7 ...... ..'..' ......... 8177. 91.00 2629. 2668 2705 6 ........ 8277. 8200 ? ·8377. 3300 ':. '.3..' 72 "385 '8.577. 5'. '...' .-..'.',.32.'i.:..,': 8677 39 37 27~3. · '.".' 3 2781...'.....,:..;<.'...... 3 · . . .. . 2820 ', ..'"'..:. ' 3 2859 39 2896 37 2931 35 2966 ":,. .. ..... '.57 / !.":.7, 250m 8700 33 32 4729.89 4927,53 5022.~3 5291,8Z 5377,77 5a64,53,$ 5552,i6; 56aO.6z~ 5729.9D 58i7,93 2642.28 E 2693.17 ~ 2789,00 E 2834,05 E 2cq77.18 = 2918.39 E 2958,i2 g 2996.78 E 303~,35 E ~'."~ ~ ~ r' ,~ ' "~ __~j_y~__.n 3105,61 ~ 3'37,59 2 3~66oC2 ~' 5990.70,,~- 3'"""93,65-' ~ 6075,":3 .5 321-",85 E 615R,61 S 3239,z~9 g $1NGLE .SNCT SURVEY 2, ?AR, :52 -.:' ' VALUES ~'01;,':.", EVEF',i 1300 F~2.::.T OF r,';EASURE¢ DEPTH, VERTICAL - ...: .SUB . . DEPTH SEA TOTAL COORDiNATES ,,,~':'.,... -."; .,, - . ., 1990 1000, 923, 0.00 2000 1997. 1920. 27.53 %O,,_.OD __ ..... Z_.8_9_z~._._..:__~83L_L. . _/:,,...L8_,_4...0_5_. 4000' ,,+ 2 ,; 2 .. 7. ., ..: . ~...::; .,."' '~:,..~:,. '1033 ,'91!586,75 5000.'.. O,O0 W I.,55 E - 523:. 7000 5553. 5476, 2970,68 S 1691.20 E e, O00 ': ,6187, 6110, 36z+6,52 S 2064,26 E 9000 ~:"-:" "~ 6803, 6725, 4'33.._9......, 94 S 2437.9 a_...E= 7..:.',":000 ' .....,.'"...7462, 7385, .... 5008,4,5 5 2782.t2 E,' · LiOCC, ..... ': "8177.'.. 810i. . . 56z~.2.5"? S 3071,57, .,, E · .. · ...:.. .. I ....' III. ,: : · .-2 · --~ ..- ! · : ' ' ' i ..... ; ' '- , ~ -; b": ~ j .......... ' Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. · Operator, Well Name and Number Reports and Materials to be received by: q --/~ Date Required Date Received Remarks - Comp letio n Report Yes ~ ~/~.~ K~ / ~ ~ ..... _---Well History Yes ~/~-. ~'~2-- ~.~i' f-~, · _~ ,, _-- , ,, Core Chips . , Core Description. /~'~/'~" ------'-.-~, & ~; Registered Survey Plat _ Inclination Survey. ,~/~ Directional Survey .Drill Stm. Test . , , INDEXED SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON 3111"C"STREET ANCHORAGE, ALASKA TELEPHONE(907) 265-OO00 MAIL:POUCH 6-612 ANCHORAGE, ALASKA 99502 TO: GETTY SFO/UNIT/ Date: 4/5/82 STATE: MARATHON Trans. #: 1477 MOBIL CC#: 49477 PHILLIPS BPAE (Transmittal Only) , w:ENTRAL F__ILES(CC#'s-Transmittal Only) SOHIO 'OPEN HOLE FINAL LOGS ing material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: OPEN HOLE FINAL LOGS Date to State Via Drilling: 4/5/82 A-20 DIL/SFL #1 3/5/82 (Sch) 2"& 5" A-20 BHCS #1 3/5/82 (Sch) 2"& 5" A-20 FDC #1 3/5/82 (Sch) 2" & 5" A-20 FDC/CNL #1 3/5/82 (Sch) 2" & 5" ,, STATE ONLY: DIRECTIONAL SURVEYS: A-20 Gyro Multi Shot Date: 3/18/82 JOb.#: A0382G0419 A-20 Magnetic Single Shot Survey . Date: 2/6/82 to Job#: 0282-006 b,~,i~,~....., · 2/28fi82 ~aska Oil & Gao Cons. Commission Anchorage SOHIO ALASKA PETROLEUM COMPANY J SFO ARCO ~ EXXON IO: PHILLIPS CENTRAL FILES (CC#' s-Transmittal Only. 3111 "C" S-[REET ANCHORAGE. ALASKA TELEPHONE (907) 265-0000 MAIL: PQUCH 6-612 ANCHORAGE, ALASKA 99502 Date:_ 4/]/g? , Trans.#: ] 47] CC#: 4q47] REFERENCE: SOHIO MAGNETIC LIS TAPES & LISTINGS Ilowing material is being submitted herewith..Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- *S-3 ~/ (Sch) OH-DIL/FDC/CNL/BHC #62633 3~5/82 #1 (01700) (Sch) CH- CNL, FDC #62640 3/8/82 #9 (01701) (Sch) OH-DIL/FDC/CNL/BHC #62605 2/22/82 #1,2&3 (01699) (Sch) CH- CNL~ #62626 3/2/82 #1 (01703) (4/87 *SFO & EXXON: An Asterisk.(*) next to a listing abo~_~means you should have received the Tape(s) and Listing(s) directly from the respective service company. P1 ease confirm this. ,/~'~"~' ~'tT~,..~E C ~ ~ V r' ~ '1 t~ Karen Xestas RECEIVED/"i ~ --, /~ -~.."'~-".' ~ ' ' . ...., , ~ ~. ~'~ ~/./~,~__ ¢ - ~ Development Geology DATE~ A?~ ~ 6 ].~]~ Well Records ALASKA OIL AND GAS CONSERVATION COMMISSION Chatt ~~e~ton TH~U: Lonnie C. Smith / ~/" Commissioner Ben LeNorman Petroleum Inspector February 17, 1982 Witness BOPE Tests on Sohio ' s A-20 Sec. 35, TilN, R13E, UM Prudhoe_ Bay Unit WednesdaY, .Februa...~ry 10 - I departed my home at 7:15 a.m. for a 7:45 a.m. showup and 8:45 a.m. departure via Alaska Airlines flight %55 for Deadhorse arriving at 10:35 a.m. Weather: -6°F, light snow, light wind. Thursday,_. February .!..! - BOPE tests on ARCO's DS 13-23A began at 10..00 p.m.... Friday, February...!...2 - · · · and were completed at 2:00 a.m., the subj'ect of a separate report. _sa~turday, February .... !..3- BOPE tests on ARCO's DS 14-29 completed, the subject of a separate report. BOPE tests on Sohio's A-20 began at 2:00 p.m. and were completed at 12:00 midnight. BOPE test report is attached. Sunday,. Febr.ug.ry !.4 - I departed Deadhorse via Alaska Airlines flight %66 at 11:10 a.m. arriving in Anchorage at 12:50 p.m. and at my home at 1:20 p.m. In summary, I witnessed a successful BOPE test on Sohio's A-20. ?ATE OF ALASKA ALASKA OIL ~S (/DNSERVATION CCM~ZISSION B .O. P .E. Inspection Report Inspector yerator_, ~_ _~$,9_/q _z'~ Representative 'Tell /~ - ~Ld) , Permit #. ~ ~ocation: Sec ~%~ T/J~R/~MZ~F~ /~[sing Set ~rillinq Contractor~'~'/u;~<~-w~-/~'~-'~Rig ~~--Representative ~ocation, Genera] ' ~el 1 Sign. ~eneral Housekeeping ~eserve pit 3OPE Stack '- ~nnular Preventer eipe Rams ~lind Rams Zhoke Line Valves q .C. R. Valve ~il 1 Line Valves- ~heck Valve Test Pressure ACCUMULATOR SYSTEM Full Charge Pressure ~/~ . psig Pressure After Closure //O ~ psig Pump incr. clos. pres. 200 psig. Full Ch~arge Pressure Attained: N2' ~ o~./ ~ ~o~i -~.~:~ J'~ psiq Controls: Master ~D/~ Remote ~ Blinds switch cover min..~ sec. min./~ sec. Kelly and Floor Safety Valves · Upper Kelly. Test Pressure Lower Kelly. Test Pres sure Ball Type__z2L<___Test Pressure Ins ide BOP ~/~ Test Pres sure Choke Manifold Test Pressure No. Valves__ No. flanges ~zO ~j ustab le Chokea ~2~ Hydrauical ly operated choke ~est Results: Failures ~ Test Time.' /~ Repair or Replacement of failed equipment to be made within. Inspector/Ccmmission office notified. ' · · day s and Distribution orig. - AO&GiC cc - Operator cc - Supervisor Inspector January 26, 1982 ~. R; It. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, Alaska 99502 Prudhoe Bay Unit A-20 Sohio Alaska Petroleum Company Permit No. 82-13 Sur. Loc. 2079t14SL, I?04tWt/L, See 35, Tl11~, lt13E., UPM. Bottomllole Loc~ ~9?'NSL, ~I99'EWL, Sec 1, T10~~, R13E, UPM. Dear Mr. Reiley~ l~nelosed is the. approved application for permit to drill the above referenced well. Well saraples and a mud log are not required. A continuous flireetionat survey is required as per 20 AAC 25,050(b)(5). If available., a tape containing the digitized log information shall be submitted on all lo/~s for copying' except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or vaigration of anadromous fish. Operations in these areas are subject to AS 16,05.870 and the rei~ulations promul~ated thereundel~ (Title 5, Alaska Administrative Code). Prior to commeneinf~ operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by A~ 46, Chapter 3', Article ? and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter ?0) and by the Federal Water Pollution Control Act, as amended. Prior to co~aencing operations you may be contacted by a representative of the Department of Environmental Conservation. Pw. R. H. Reiley Prudhoe Bay Unit A-20 -2- January 26, 1982 To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like to be notified so that a representative of the Commission may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please /~ive this office adequate advance notification so that we may have a witness present. Very truly yours, Harry ~/.. Eugler Commissioner of BY ORDF-R OF THE COn, MISSION Alaska Oil and Gas Conservation ~tssion Eno 1 o sure Department of Fish ~ Game, Habitat Sect ion w/o encl. Department of l/nvix-onmental Conservation w/o encl. SOHIO ALASKA PETROLEUM COMPANY January 18, 1982 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Alaska Oil & Gas Conservation Con~ission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. LonnielC; Smith Gentlemen: Well A-20 (24-01-10-13) Enclosed are the following documents, in triplicate, for the above-named well together with our check for $100.00 to cover the permit filing fee. 1. Application for Permit to Drill, 2. Proposed Drilling Program Outline, 3. Blowout Prevention Equipment Diagram, 4. Surveyor's plat showing well location, 5. Directional Map. If you have any questions, please contact either R. H. Reiley at 263-5183 or K. W. Kolthoff at 263-5176. RHR:ja Enclosures cc: Well File #17 Yours very truly, R. H. Reiley ~ District Drilling Engi- '--' - 'n~er t~ ~ ~ ~ i ~E ~ JAN 1 8 19!!2 ,~.l:~s!{~ 0it & Gas (ions. Commissio~ /~nchorag~ PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [] lb. Type of well EXPLORATORY I-I SERVICE [] STRATIGRAPHIC [] REDRILL [] DEVELOPMENT OIL[] SINGLE ZONEW---I DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 9. Unit or lease name 2079' NSL, 1704' WEL, Sec. 35, TllN, R13E, ~ Prudhoe Bay Unit At top of proposed producing i,terva~ (target) 10. Well number 1000' NSL, 1700' EWL, Sec. 01, T10N, R13E, UPM A-20 (24-01-10-%'3) At total depth 11. Field and pool 297' NSL, 2199' EWL, Sec. 01, T10N, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Prudhoe Oil Pool Est. KBE = 65' AMSLI ADL 47472 12. Bond information (see 20 AAC 25.025) Type Blanket surety and/or number Safeco Tns. 2975387 Amount $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed NW of Deadhorse 10 miles west of ADL 28313 3081 feet well X-6 2650 feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 13130'MD 9610'TVD feet 2501 February 20, 1982 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures __333.0__ psig@ . Sur~'ace KICK OFF POINT 1600 feet. MAXIMUM HOLEANGLE 49 ° l (see 20 AAC 25.035 (c) (2) ~psig@ 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT I Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 36" 20x30 Insular:ed Conductor 80' Surface ll0'l1 110' 8 cu.yds, conCrete 17 1/2 13 3/8. 72# L-80 Butt. .2747' Surface 2747'I 2700' 3720 cu.ft. Permafr°s~ 12 1/4 9 5/8 4'7~ L-80 Butt. 1~0~ Surface 11780'1 8724' 1700 cu.ft. Class G; -- i I ]30 cu. ft Permafrost ~ · 8 1/2 7 26# L-80 IJ4S 1850' 11280' ~, 8396' 13130' ~ 9610' 435 cu. ft. Class G 22. Describe proposed program: W/18% salt" See attached proposed drilling program outline. , 23. I hereby certify that the foregoing is true and,,~rect to th,F~st of my knowledge SIGNED [__)%-'/ ~.~ ~ ~ T,TLEDistrict Drilling Engineer;ATE The space below for Commiss~n use R, H. Reiley CONDITIONS OF APPROVAL Samples required Mud log required Directional Survey required APl number []YES ~-NO []YES [~%JO J~YES []NO 50--¢~ Approval date ~ Permit number ~"~,"/3 ~1 /9~/R9. j SEE COVER LETTER FOR OTHER REQUIREMENTS / - / - / b'y order of the Commission II Form 10~,01 ' Submit i n triplicate Rev. 7-1-80 PROPOSED DRILLING AND OCMPLETION PROGRAM Wn~.~. A-20 (24-01-10-13) Dry bucket 36" hole to 80' below ground level and cement 20" x 30" insulated conductor to surface using 8 cu.yds, concrete. Drill 17 1/2" hole vertically to 1600', then drill directionally to 2747' MD. Run 13 3/8" 729 L-80 Buttress casing to 2747' MD and cement with 3720 cu. ft. Permafrost II cement. Blcwout prevention equipment consists of 5000 psi W.P. pipe rams, blind rams, and annular preventer from 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8727' TVD. Run 9 5/8" 479 L-80 But- tress casing to 872_4~ TVD and cement first stage with 1700 cu. ft. Class G cement. Cement second stage through D.V. packer collar at 2600' with 130 cu.ft. Permafrost C cement. 9 5/8" casing will be hung at surface; the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Drill 8 1/2" hole to T.D. at 9610' TVD. Cement 7" liner to 500' inside 9 5/8" casing shoe with 435 cu. ft. Class G cement with 18% salt. Run 3 1/2" EUE A/B mod. 8rd tubing with gas lift mandrels and a production packer assembly at 8363' TVD. A subsurface safety valve with dual control lines will be placed at 2100'. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be submitted on Sundry Notice to follow. 1:5 TRIPLE RAM STA~ 5000 PSI WP DRILLING _/ 3 ! ANNULAR PREVENTER 1 I PIPE RAMS 2' KILL LINE BLIND RAMS DRILLING SPOOL I I CHECK GATE GATE PIPE RAMS i , , 4' CHOKE LINE GATE HYDR. ASST. Iii 12] GATE ! ] 04 o, I o~ TIIN , T~ON I o~ o~ 40 { I0 20 30 26, i 25, I I I I I 1-21 '1 (Proposed) I ~ 200'_ ! A- 20 ~1 - . (Proposed) .'~ '" I_ '~?o_o~'L~-~ .... ~ ~. -*~ __ WELLS f24- 0/-/0- PAD DETAIL I~~p SCALE: 1":400' ORTION OF T. IO E~ II N.~R. ISE.,U.M. SCALE: !"= I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that I am properly registered to practice land surveying in the State of Alaska and that this plot represents o Iocotionsurvey of the wellpod Shownond the wells thereon. This survey was mode by me or under my supervision ondolldimensions and otherdetoils ore correct. Bottom hole locations ore furnished by others. Date PLAT 3 OF 3 PAD "A" EXTEN S ION Located in I/2 PROTRACTED SEC. 35~T. IIN.iR. ISE.iUMIA'r MER.,ALASKA Surveyed for ~OHIO ALASKA PETROLEUM CO. Surveyed by EM. LINDSEY ~ ASSOC. LAND 6 HYDROGRAPHIC SURvEYo'RS 2502West Northern Lights Boulevard Box 4-081 Anchorage Alaska A-20 PATH INTERSt~CTI~S ~ A-16: 4942'TVD A-18: 4810'TVD A-20: 3483 1" = 500' .... A-17: 8411 : ~ -4---2- CHECK LIST EOR NEW WELL PERMITS Company Lease & Well No. ITeM APPROVE DATE (1) Fee 4, 5. 6, 7. 8. (3) Admin /~4-- ~ -~'~ 9, ( thru 11) 10, 11, (4) Casg 12~~thru 20)/~/~'~ (5) (21 thr~ ~7 12. 13 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. YES NO ,, Is the permit fee attached .......................................... Is well to be located in a defined pool ............................ Is well located proper distance from property line ................. Is well located proper distance from other wells ................... Is sufficient undedicated acreage available in this pool ........... Is well to be deviated and is well bore plat included .............. Is operator the only affected party ................................ Can permit be approved before ten-day wait ..................... .... Does operator have a bond in force ............ i i !' Is a conservation order needed ii2 ~ i ~i~ ~ Is enough cement used to circulate on conductor and surface ....... Will cement tie in surface and intermediate or production strings . Will cement cover all known productive horizons ................... Will surface Casing protect fresh water zones ....... : .............. Will all casing give adequate safety in collapse, tension and burst Is this well to be kicked off from an existing wellbore ............. Is old~ wellbore abandonment procedure included on 10-403. ........... Is adequate well bore separation proposed ......................... Is diverter system required a eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee · Are necessary diagrams of diverter and BOP_.equipment_~~attached,, .... Does BOPE have sufficient pressure rating Test. to psig ,.~,~ ' Does the choke manifold comply w/API RP-53 (Feb.78). ................. R~WLARKS (6) Add:~ 25. Additional requirement Additional Remarks:' Geology: Engin~ring: ! JAL~~MT~f.~~ . rev: 01/13/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well Histoq/File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPE .NDIXi ,. No special'effort has been made to chronologically organize this category of information. ,o ~ .... SCHLUMBERGER .... · 5IS ~AP~ LVP 009.H05 VERIFICATION LISTING PAGE ** REE~J HEADER ** SERVICE NAME :SERVIC DATE :82/0]/13 ORIGIN : REEL NAME :REEL ID CONTiNJATIO~{ ~ :0! PREViO!;S REEL COMHEN'~S :REEL COMMENTS ~, TAPE HEADER SERVICE NAME :SERVIC DATE ORIGIN :1070 TAPE N~%~E :62633 CONTiNJATION # :0! PREVIO,)S TAPE : COMMENTS :T~PE COMMENTS ~ FILE HEADER ~ FILE ~AME :SERVIC.O0! SERVICE NA~E : VERSION # : DATE : MAXIMU~ LENGTH : ~024 FILE T~PE : PR~VIO~!S FILE : ** INF~)R~ATION RECORDS CONTENTS CN : WN : FN : RANG: TON~: SECT: COUP: STAT: CTRY: MNEM S~)HiO A-20 (24-01-10-1g) PRUDHUE BAY llN NORTH SLOPE ALASKA USA CON~ENTS PRES: NEDIT4F RECORD TYPE 047 *~ UNIT TYPE CATE SIZE CODE 000 000 O06 065 000 000 018 065 000 000 012 065 000 000 003 065 000 000 003 065 000 000 002 065 000 000 012 065 000 000 006 065 000 000 004 065 UNIT TYPE CATE SIZE CODE 000 000 007 065 6VP O0g.H05 VERIFICATION 6ISTING PAGE 2 RECORD TYPE 047 *$ ** RECORO TYPE 047 PACIFIC COAST COMPUTING CENTER COMPA~JY : SOHIO WELL = A-20 (24-01-i0'19) FI£LO = PRUDHOE SAY COUNfY : NORTH SLOPE STATE : ALASKA JOB ~ 10707,62633 DI~ ROg #i, LOGGED 05-MAR'~2 BOTTU~q LOG iNTERVAL TOP LOG INTERVAL CASING-LOGGER BlT SIZE TYPE H~:)£,E FLUID DENSITY VISCO~fTY PM = 13014.0 FT. = 11884.0 FT. -- 9.625 IN. 0 11884 FT. = 8.5 iN. = LIGNOSULFOMATE =9.5 = 36.0 = 9.5 LVP 009.H05 VERIFICATION LIST,lNG PAGE 3 FLUID LOSS RM ~ ,~AS. TEMP. RMF a ~EAS. TEMP. R~C ~a ~EAS. TEMP. RM ~ BHT 5.7 ~b 2.080 ~ 6R.O F ~.720 ~ 76.0 F 2,800 £a 6B.O F 0.8.04 ~ 187.0 F MATRIX ~IMESTONE ** DAT.~ FORMAT RECORD ** ENTRY ~hOCKS TYPE SIZE REPR CODE ENTRY 4 I 66 1 8 4 73 60 9 4 65 .1IN u I 66 0 DATUM ,~P.~C,[FICATIUN BLOCKS MNE~ SERVICE SERVICE UNI~ AP1 AP1 API AP1 FILE SIZE PROCESS SAMPLE REPR ID ORDER ~ LOG TYPE CLASS MOD NO. DEPT FT 0 0 0 0 0 4 SFLO i)iL OH~ 7 0 0 0 0 4 ILM OIL OH~ 7 0 0 0 0 4 ILD /)IL OHM~ 7 12 46 0 0 4 SP ;)IL ~V 7 ! 0 0 0 4 GR 015 GAPI 7 31 ~2 0 0 4 DT IS US/F 0 52 32 0 0 4 GR IS GAPI 0 3! 32 0 0 4 NPMi FDN PU 42 68 2 0 0 4 RHOB ~DN G/C] 42 35 ! 0 0 4 DRHO ~UC G/C3 0 ~4 0 0 0 4 CADi FD~ IN 42 28 3 0 0 4 GR FDN GAPI 42 31 32 0 0 4 NRAT FDN 42 42 i 0 0 4 NCNL FDN 42 34 92 0 0 4 FCN5 ~DN 42 34 93 0 0 4 CODE 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 DATA DEPT 13043.500 SFSU 5.375 ILM BP -30,984 GR 86.813 PT NPHI -999.250 RHO6 -999.250 DRHO 5.371 ILO 70.563 Ga -999.250 CALl 5.543 86.813 -999.250 bVP 009.H05 VERITICATION LISTING PAGE 4 GR -999.250 NRAT -99 DEFT 13000.000 SFLD SP -36.156 GR NPHI 20.703 RHOB GR 87.500 NRAT DEPT 12900.000 SFbU SP -80.875 GR NPHI 14.844 RHOB GR 35.031 NRAT DEPT 12800.000 SFLU SP -114.750 GR NPHi 20.117 RHOB GR 23.594 NRAT DEPT 12700.000 SFLU SP -103.625 GR NPH! 22.510 RHO~ GR 21.672 NRAT DEPT 12600.000 SFL~ SP -110.063 GR NPHI 18.457 RHOB GR 22.641 NRAT DEPI 12500,000 SF5G SP -102.438 GR NPMI 15,674 RHO~ GR 36.125 N~AT DEP~ 12400.00U SFbU SP -102.312 GR NPHI 17.041 RaGS GR 23,719 NRAT DEPT 12300.000 SFbU SP -79.125 GR NPHi 16.846 RHOB GR 40,938 NRAT DEPT 12200.000 SFLU SP -91.250 GR NPHI 15.869 RHO~ GR 55.344 NRAT DEPT 12100.000 SFbU SP -125.063 GR NPHI 19'971 RHOB GR 25.391 NRAT DEPT 12000.000 SFLU SP -65.000 GR 18 9.250 6.266 2,063 2,408 2.377 0.656 2.~06 2.441 2.014 5,465 0.656 2 299 2[367 4.738 8.594 2.260 2,525 7.2~! 1.063 2.357 2.273 1. 000 8.719 2.340 2.193 8.695 2.250 2.328 2.191 2.461 0.922 2,500 2,23~ 3.344 0.781 2 473 2~322 4.133 8.516 2.242 2.4~$ ~.7~6 3.6'~5, DT DRHO DR~O DT DRHO ~CNL DT DRHO ~CN~ DT DRHO DT DRHO NCN~ DT IL~ DRHO ORHO I~ DT DRMO ~CN~ DT -999.250 6.012 70.750 0.i61 3494,000 5.148 73.37~ 0.051 4496.000 2.465 88.188 0.000 3768.000 1,828 92.188 0.039 3638,000 2.59~ 79.000 0.036 416~.000 5.359 ~3.750 0,020 4752.000 3.525 80.000 0.008 4252.000 10,086 71.563 0,020 4344.000 6.688 80.188 0.050 3404.000 10.781 91.563 -0.001 3536.000 8.086 84,563 FCN5 CALl FCN5 GR CALl FCNL GR CAI, I FCNL GR CALI FCNL ILL GR CALl GR CALI FCN~ GR CALl FCNL GR CADI CALI FCNL I LD GR CALI FCNL -999.250 5.066 72.063 8.266 i345.000 4.395 34.000 8.609 20~4,000 i64 8,625 1447'000 1.649 18.391 8,594 1397,000 2.229 22.188 8 813 I707~000 4,664 21'359 10,125 2037.000 3.014 20,859 8.977 1779.000 7.594 30.922 9.672 1868.000 7.105 40.781 13,242 1380.000 12,852 18.516 10 180 1383~000 i0.648 145.250 LVP O0~.H()5 VERIFICATION [~ISTING NPHI ], 5.13'1 RH03 GR 154.750 NRAT 2.627 2. 164 DEPT 11900.000 SFLU SP -51.281 GR NPHI 15.674 RHOB GR 230.625 NRAT 8.438 124.625 DT 2.525 2.217 NCNb DEPT 1i~00.500 SFbU SP -138.875 GR NPHi -999.250 RHOB GR -999.250 NRAT 13.758 Ib~ 68.250 DT -999.250 DRMO -999.25G NCNb *~ FILE TRAILER ~ FILE HAME :SERVIC.O01 SERVICE NAME : VERSIO~ # DATE : MAXi~[3i4 LENGTH : 1024 FILE ~YPE : NEXT FILE NAME : 0.0)7 4592.000 8.359 59.594 0.030 3548.000 2000.000 70.750 -999.250 -999.250 CADI FCN6 ILD GR CALI FCNL GR CALI FCNL PAGE 10.211 2018.000 9.484 42.656 10.430 1510.000 34,219 68.250 -999.250 -999.250 ** TAP~] TRAILER *~ SERVICE NAME :SERVIC DATE :~2/03/13 ORIGIN :1070 TAPE ~AME :62633 CONTINIIATION # :0t NEXT TAPE NA~,E : COMMENTS :TAPE COMMENTS ** REEL TRAILER ** SERVICE NAME :SERVIC DAT~ :~2/03/13 ORIGIN : REEL mAriE :REED ID CONTINUATION # :01 NEXT REEL NAME : CON~E~TS :REEL COMMENTS EOF EOF RIGI ~ :0000 TaPE :~'~ A a E :8051 _ ~.': *************************************. * FIL, E HEADER *~ ~ :.:-..';~ : ~:- !LE aA.~ E :SERVIC.O01 8E.,VICE~ NAMe; ...... I ~ ~ _ .~E · ' ' MAXIaUM bEI~GTH ; 1024 REVlOOS FIhE : .- . ::. . - ; · ** IN~DRHATION RECORDS MNE~ COr~ TENT8 - _UNII ~:~P~ CAI~ SIZ~ ~N : a-20 .- ; . _ > .: . . 000 OOO U04 FN : gJR(i/jHOE, 8AY' ' 000 0tO~" 012 RANG: 13~ -': -: - 000 OOO 004 u 'OUP,~: ~. 5[,Opa'; 000 000 008 ~"A"". ... Ab.A~KA ' _ ,::, . , 000 000 OO~ TRY: USA 000 000 O0 - _ - - .~. .: : : . . . CODE 005 005 065 065 065 065 065 065 065 AI~SK~' ~'fJMPUTtNG CENTER FIELD = PRUDF~'OE B~Y "-"~ S'[ATE = ALASK-A RUN bOgG~2!;., ~E~ :t7 ~8:] _ ~'-- bDP~', IFtD'A'f~; ~'~' ~ ~' CASING CASING CASING CA~ING TYPE FLUI~ FI~UID LEVEb ** t)ATA FOR;~A%' RECOR'D ** ENTR~? [~bUCKS TYPE ObOCK DATUF~ SPECIFICATION 2 DEP~: F'r 0 0 - 0 0 0 4 8I(;~ PSi - CO:.---- ..1-: ~:. 0 - 0 ~ FSIO [,ol 0 O' 0 0 0 ~ ~a ' P~i GAP'I O 3i 32 0 O 4 E T P ~ P $ I C PS O 0 0 0 ' O 4 S!G PS2 - 0 ~ 0 .... 0 0 0 ~ TRAT P~2 · . .0 ~ (;R PS 2 GApI .... '6 '3 32 0 ~ FA2 ' CPS '0' O' 0 0 0 .. FTD~' PS2 CPS '- 0 0 0 -0 - 0 ... FSlC; PS3 ' O" ..... 0 O 0 0 , ~ , ::;' , GR PS3 ' GaPI' .... 0 31 32 0 0 4 BACK ~3 : , :CP.~'--':.: ::::.;:0¢-:~ : · _ O 4 FBAC' PS3 CPS': 0 O' ' ' O: 0 0 4 aTt)T P83 , ::.:0 ':.- 0 :C · , _0 FTDT FS3 CPS '0 '0 0 0 ' O' 4 ........ 4-0 ~SiG PS4 . 0 '0 0 0 0 4 0 GR PS4 (;AP1 0 3I 32 0 0 BAC[ Po ..' CP8-:':~ -0~ .:_0:0 FBAC PS4 CPS ' 0 .... 0 0 : 0 0 ..... ' ....... " " ' '} ': FTDT P~4 CPS '0 0 0 0 0 FSI6 PS5 ...... ? ....... 0 ' 0 PA,:5 :,0:~-. 42-:' ,_I' ~ :0 T~ATGR FS5 'gA, Pi?l' 0'' 3t. ' 32. _ O< 0 BAC[ PS5 : ~CP'8: :~ 0:: :.:"'"0-- .._,:0 :, 0 0 FTDT PS5 CPS 0 0 : 0 0 0 · * DATA ** : 2 DEPT 1291{,0000 81GM..: ::.:: 9:¢1-2590 Fa!g G~ '999;~500 BAC'~ -99'9;~500 ' FB&C -999'2500 FTD~ -99.942500 -SiC;M,'. ',:-999:,,25:,00- F816 -999,2500 FTDT . .-9~9,2500 .~I~M ...9:8:9:~:~:500 f S:l.~ -~99,2500 G~}" -999';2506- 'B/~:C~' "'099:";~500 :'FSAC '999;~500 F'TDT -999,2500 $IGM _ :-999:;.250.0-- F'~IG --999.2500 i PAGE CODE 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 b8 68 Z999,2500 999,2500 '999,2500 '999.2500 "999,2500 '999,2500 "999.2500 GR FTD~~ G~ - 999,2500 ~ !GM ,99.9 ~: 25:0 U: -0§9,250o g~ACK -999;2500 FB~C -999.2500 "'- . G~ o.Oovo tACK ~7.4375 ~BaC Ga -999'2500 BACK '999;2500 FSAC GR -999;2500 BACF, -999'2500 FBAC G}.~ -999,2500 ' BACK -999. 2500 P~au GH -099'2500 ~AC~ ' '999,2500 FBAU FTDT '999,2500 -. 5:. :.: 5 ~: : .2187 B.~,CK 48~9375 FBAC ,4063 6A.C~ i62 I250 FSAC o'ooo 0oo~- 8i57a .,::t.:a. 7:':9,69 9062 8ACK i63 3750 FB~C .3320 BACK I63 8750 ~BAC F%.T 170'7813 ~' - -" DEPT 12700,0000 ~16a - : : F6-IG ~;k ' ' 9~1.953 BAC~ 69'5000 Fa'AC FTDT 212~0000 ~ .... 14; 445~ gaC~ !'74180'27 F8aC G~' 21,5156 ' BACX 168;'7500 FBAC FTD~t' 169,5J1~ S~GM :' 1"9', {l 8:20 F~IG GR " 18~5046 !:~ ;~ C~ I75;56aS FOAC ~r' T 183,3047 DEPT FTDT G~ FTDT FTDT GR FTDT FTDT DEPT · !0. 68'!5 gAC~. ' 79;1250 F6AC 183. 0000 8I~M-~ · 1::~.,2969 . ~5tG 13 7734 ' B~C~: i67~2500 FBA. C 17 B, 0 O 00 8 l-g ~,~ ::. i 8,64.99 ~ ~I G !7 9512 BACK 177;3477 FBAC I9 6406 ii,Ca i 80", 25-00 FBAC :. 3.5 .'. 24 9 7' BACK 18'4 5000 ~B'aC 200 0250 12500.0000 ~IGM · I8~9375 FSIG . -999.2500 ., ~. ¢,, A~ '999 i 2500 NTD~[ 58'2813 NTO.r 61. 1562 NTDT " i6 · 262:7 · 60,3555 ' 16,4688 TRA~ 2.5;6406 ' NTDZ 1:b,09~ TRAT 63.0938 NTDT .16-0000 TRAT PAGE 9992500 999:2500 999.2500 2,9473 71.6875 Z999,25oo 999,2500 Z999,25oo 999,2500 ~999,25oo -999.2500 ,99~,250o -999,2500 2,82~2 227.5000 '~ 8934 21:0742 2,931~ 221.0000 ~,0508 196'5000 3.0043 218.3438 3,0000 232,7500 3,0~69 228'5000 ''0135 2,9385 229,4375 3,0349 21,8.2187 2,7256 172,6250 2,8477 1.07,7500 202, 0 2,8262 225,2500 2,7324 2!b.6250 2,5560 L"~I~ ltl iii iI;] i[~ [:-] ~ P];'[;~.i 1.97.,2~00 8.IG::~'..:.:-:. !9,:'0~49- F-$.IG - 16~497;1 TRAT GR 16,9~3 t~ACK 174'8750 FBAC 66,3~67 NTDT GR 1.5~i~75 BACK i8B~'6750 ' F$AC ' 70i562"5 NTDT GR ' ' 21;I40b . 'BACK I79;3750 F~AC 66'8750 NTC'T GR 21,96'8"1 BACK 17'7;'6250 Fa'AC 75-. 875'0 NTD FTDT ia: ,8;50 .-: '::~- --.-:': :~: _ : : 8.3t~ 1.2 B~(.K G ~ 14 , 9 i 02 BACK FI!DT 1 G~ 20 , 42i 9 8.A C:& i79< GR 2i,3672 ~ B~CK i79" GR 1.9,2422 ~ 1250 F.BAC 67',7500 ~[DT : GR 1'1,9062 ~CK I7=5 GR - 26, ~ 75 O $~C.~ 182 GR 27 ~ ~219 B~CK 186 ! GR~ 2! F~TDT d~ 25 G~ 3 <) FTDT .2031 ~R - .) .-:.. _.~ ~ ' .. ,. 9375 FBAC 4..;59382 NTDT 7:8'13 G : : 1:4'8359 - TRAT 8 '7 5'0 F aA C 62,7 81 ] N TD T ~31. FS:IG - 16~4219 TRAT 3750 'FBAC ' 72.0b25' NTDT ' FB'AC 65; 1B7'5 2500 FB~C 7-0; 3750 NTDT ,7500 7'1-88 ~'RA,. 0000 GR , i2.9062 BACK I17'2'500 F~AC ~b,2187 .NTDT FTI)T 3014 bOgO ~tCia . ::~:.i.8:::~..:1~.::49 FSfG 15,2b-9~ .' ' '~ R~' A GR 2I~2493 BAC~. : !85;3'750 FI~hC 70 ~ 6:2-50 ~DT - ~ .... 228.0000 2,~371 219,1719 2,4902 207,7500 2,5098 232,5000 0000 6445 2,7734 207;5000 0~,8750 2 ,7500 2.9141 184,8750 2,5879 164,8750 17 1250 2.~621 166.3750 2,5703 195.5000 2,5000 175,5000 500O 17 5000 2,4068 194,2500 5000 183.7B13 28 ,5641 .7500 2,6521 275.9512 31 0000 2,7478 GR 27.0~38 '~ACg !79 6256 'FBgC 64;6~75 ~I:'DT FTDT 262;7500 : - - . ;::: :'~':_~.-~ - GR ' 65;1~75 B~C~: 193; 6250 ' FBA'C GR 67;55~7 'Bt~CK I'98';750'0 FBAC NTDT ~TDT 30~,43/~ :81G?~- :' '~SIG : 2:5 7:~1i ' ~RAT GR 6(~; 3438 BACK 188'; 8750 FBAC 108'. 3750 NTDT G~ , 59,3125' ~h C"K 19'0;0078 FB'AC ~16,6016 NTDT FTDT 267~ 5000-. : ? ::5-7 5. - :-: :::::::::::::::::::::::::::::: GR 62 1562 8iC~. ' 19:'; i250 FS~C 117~8750 NTDT 1'07 .. ;6875 NTDT G~ 70, :~ s GR 67, 5000 BACK: 197;8'730 FBAC I15;2734, FTDT 28.4, 8 ? 50 ' :8 I.:"G::~ :* ':. 2: ~::-:2 :7't.:7':3 FSI'G - 2:. :, ~98:0 ' OEP]. 1.1800,000~ : 8I:G/M. :-::.:~::~: OO~,~ '8~( 0-~3:8 62'50 Fg'AC 1562 NTDT G~ , 36;0313 BA. CK 144 . 56. Fj~DI: 199.,~750 -$~G':/M'--:-' :' ::. ::3:7::~50 :' F~:::%G -35,906:2 TRA. T GR 40;2813 ' Bi~.' I85 7500 F~AC 71,187:5 NTDT FTDT 204S 37~0 SlG:~ ~ _: ::36:6::~::19 - FS:.I:G ~.7,96.4:8 T~AT Gl;: , 44,5625 B~CK I92 2500 'F:AC g:6.7500 NTDT " ..... ~'~:' :; 5025 ~RAT GR 48,6[{55 BACK ' 18], 0000 FBAC 72,4375 NTDT FTDT 189, )000 ~IG'.:~ : _ ::-:3:7- 1:-~.:75- FS:iG 39,5625 _ TRAT GR 51,0938 ' }3ACK t84 7500 FBiC 73.3750 ~TDT . . ~ 0 " ' FTDT 2 4,8!50-? :: :: ? ;:':::: ::: : _ O~:/!: ~' I 1758, O000 8IGC:. : .<- 9:~ 2500 ~.lg ,250:i~ 1RAT ,2500 ~,.TDT GR '999,25()0 ' ~iC~ -99:9~500 ~ FS~C ' ' GR -999' 2500 BACK '999,25'00 FBAC ' 250-0 NTDT FTDT -999,25({0 ~iGM. ':--999:, ~500 f'~:!:G '-999,2500 -_ TRAT GR -999; 2500 BACK '99922SO0 FSAC '99922500 NTDT -999;2500 BACK '99-9:; 250 0 F'BAC '999'2500 NTDT F[DT 999,~500 8IGM- '.::: ::.::.:3:8::,t.7'50 ~.$1G 2b¥-0- ~R:A GR ~39,2813 B.AC~' I86';0000 FSAC ~:6875NTD FTDT 210' 8750 -' : :_ '_: ' ' · ~ _. . -. :. :. . . _..., .?.:/ - . :: ::: : } .... . _ PAG~ 288.8008 2,7461 238.3750 ] 8828 351:7500 36~,55~6 .2500 3,93~I 374.62 0 ~.7324 313,0000 3;6709 338.1562 3,566~ 393,5000 38~ ,4600 .2500 3,372~ 423,6758 3.5654 367,3125 3,5305 385.3359 5 9~92 428:2500 5,726b 407,2500 5,6451 404,9531 6,1719 365~7500  ,4180 41 ,7500 -999.2500 -999.2500 -999,2500 -999.2500 -999.2500 -999 2500 '999 2500 -999 2500 b 9531 423 7500 PAG~ 7 ** TAPE T'[~AZbER OATE :83/03t 3 ~:AP~,: ~A~E :8051 COMMENTS :TAPE t)AT~: :8310]/ 3 % ,. ~ · i~_ ~ - _ - ... _ :. ~:. : : R~'iEL ~A~: :REEL ID .... ~ ..... . .... ~ CONTI~[ A'I ION COM~E[~TS ':REED CO .