Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-043
STATE OF ALASKA IIINLASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIOIQS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: Pull Upper Perf Straddle I1 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-043 3. Address: P.O.Box 196612 Anchorage, Development m Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-21798-01-00 7. Property Designation(Lease Number): ADL 0028262 8. Well Name and Number: PBU Z-06A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11955 feet Plugs measured 11848 feet true vertical 9040 feet Junk measured feet Effective Depth: measured 9049 feet Packer measured 9014 feet true vertical 8400 feet Packer true vertical 8366 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 37-117 37-117 1490 470 Surface 2624 13-3/8" 36-2659 36-2659 5020 2260 Intermediate 6693 9-5/8" 34-6728 34-6145 6870 4760 Production Liner 2826 4-1/2" 9127-11953 8477-9039 8430 7500 Liner 2729 7" 6581-9310 6024-8659 7240 5410 Perforation Depth: Measured depth: 9556-11680 feet �{{� 18 True vertical depth: 8883-8903 feet feetc�e�s"ED JAN J Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 32-9137 32-8488 Packers and SSSV(type,measured and 4-1/2"HES TNT Perm Packer 9014 8366 true vertical depth) Stimulation or cement squeeze summary: E q(C msslL•w•'\E Intervals treated(measured): Treatment descriptions including volumes used and final pressure: JAN 2018 13. Representative Daily Average Production or IrG C V Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 288 240 344 1182 248 Subsequent to operation: 335 349 400 1042 260 14.Attachments:(required per 20 AAC 25.070.25.071,&252831 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development QJ Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil RI Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Peru,Cale Contact Name: Peru,Cale Authorized Title: Petroleum En ineer / Contact Email: Cale.Peru@bp.com Authorized Signature: Date: ' / /©/ Contact Phone: +1 9075644522 Form 10-404 Revised 04/2017 177-1 1//b "/JY / ;?. RBDMS�pS ‘./JANAN 1 1 2C18 Submit Original Only • • ,xry Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary January 10, 2018 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for the Pulling of the Upper Portion of the Perforation Straddle to open the upper Perforation Zone to Flow for Well Z-06A, PTD # 212-043. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 IP • D.) C c N O - o E m (7) CL coo a i a) , ° O N L# Y a. o O \ co• 0_ Q w LL O !Z Q O 0 0 (/) p) UrLC ' 0i-. 00 CQ 73 '^ J O N .--.-- E O D_ L N b H N v * 2E O u- L to---:.) (/) U) Q `� O O 0 3 c - co b _O btz _ _ O . _ (1) E7-.O 10 N O W N (DM O C O O Off • E L7 a) a) E � - °° 26 2 � E EJ o aL ' g0 a) Eo o @Q..0) CA O C a) N O N Q 0 ;C J J O Co C a)ao) - •E Q Q,� v Q � O �3: w � � ° �"...--- < < - = p � . d 2 LL 'O c : a) o cCU N J ~ x N a) J O J Q F_ co 00 U) �-. o < Q O Q 2 -'6 -O Z_-) ao co H U) M OD Q M ,— (a a) 2 Q H m O pU) U) ch In _1 m a cn O to a) a X 0 N a (n E 2 � ( v vC7 � a � � ou am o w0 wo > m3 0 Ga p a) ma a V) rn UU) � @�pO U �\ O � � Z > .S o U N OL o co O 0 U w N M = Z V m J D J a) E C H a CL � C7 � � � rnHDz Wb No � pH CI c0 II Q 1- 0 r` w W m * a) coo r` * N0u- * � g1- aU NU v) J LQ < CL J « ._q c) J0 � : apo : 4 ILwF= * rr .o Qo00 2Eor- C 0 r� Y V u_ i_ r- - LLJr� o � . OU) Ur- o73O- -1 c) HO < vo� O Q. •= 0 ,7, CZ O = -- N Y -- v- LL U) a_ LLJ -, C a) af m J C D Q Ce EE M � � -0Q2 24Q = 22MOmCLGO ,- 2 EO (nEECO2Ea CL F- Q � Uc.rH � o O .? < OQ � � oC Oct YC � aa2) Q (wnF- OEtOwCD0 �OC )- 3 � rso U > Dao ~ cn ao z � H (jUrn (nQ Q. - a - 73 2 Z nuv0a) au) (Gnu, (0n (Gn0 -X00000 -- 00 00 U) NC 0 �mO66 U -- � �cp o � oa >-- ; a o ECLCD 0_ oa � � aLL zW -- � � - w (n � Y > (no c � OC �� (n O0 ' L \ LUUJ U � DUJ UJ MF- � DUJ UJ F_ UU2 UJ 00 � � � XU $ � mNw � c00 �> CO2 U u_ => Zo ooz5zz _Zz (nZZ - o > N JUHc) L- J ' H � HF- LHHa g P:TA, F--F-- 0Q0JN > > E E ._ � _ OZ LL - zmzz zz V Z Z i . � H J �' C O O C � wD0 rr m C = OD001wQOwwC° 200 'rv � J (n Jw " C p4 L— O > (� U � U0 3 0000 — HUUH > z UUF- ZHJHJO L C C � Q * CC ; H a- ou_ ; CC ; ; 0 < «le iC < CC CC ; ; U) CCU)LLI aU)LLI d ; H000QLtjU>) W I- N- r- N- N- N- r` r-- 0 } o 0 o O o O O o H N N N N N N N N 5 (NI N co V C j co a) O F_ = r r r rr 0 Q • . N U b U . u) O O _a Lo coLo D N Q N r 05 -O N - r- (u a) C C) ~ Q • O I- -0 LnQ:_ co C Y N 7N ' a) a) O i O a. (/)a ) > C a) a) a-' O (0 U)co o a) 0 Q J Lo _co C CL D C O E O N 0 c) O *. a) N v J * - La U• a. r Co " Q L r C C _C Q w U) O O W 3 C N (n (n LL O V (n m N 'J (0 7 I- Q Q Fa Q tl () a a) O- 0 O U c N O (n * -. N a) iu) J _1 a 06 N H N , coo (n a) -='-'- < Z • CU U) Q U �+ O N a) a. , O 6 O 1.-1 (n (n W' J N m N N a) Q ' a) N Q W W O N a s O N -O _ O a. 0 0 0. ,- J N Q C a-. ` U In -c co 06 Z Z_ Q Y LL U I- O U O *k 0 •U LL J LL _ OJ Nees 0 m* LC) Z ~ _ U) W to ..0- w , O O 0 N a) a J O J U +- L . O N - v0i o U z �Q o o B° � 5 S W C) (Ir) 2 0 :=L-'_ O MQ � o U * •• WZ * Q_OO N (n `� �� �N °25 @�� 2 _OSS 4-1 m * _0m O cNo cn0 O *Lo O * J O J r I- Y O * 0 J I CC J O d � � v_ �; jo � � * N � Ln -- •a) a) _a 2 NC � * 0) C (0 O O O W' W U OJ L (N_ O E "3 "C -O 0 r0 (n J H i_ U O LC) 1_ c 0 80 u) � O Qin c`o zYo `" > mZ2w Qa' coNU) (n >, (n (n _a ,_ Zea `- I- di oLi a) Z ,_ ,- oZOH U � HOr � (Z' O - O � (n ( UN- E . a. r N L � O � � N - ZW Z > > .ur` •� "p E N r o D Lr) O- C N _ O ~ c ,- T- -... 0 J J 0 - Li ' -1 `- 0 D oy � Z °° � ° � - C3 I-' N � a �J � � aU J ODUJ` o2 Cl- ,97 3 � Nar U N z (n 0O mH- Dr � � ZO m0r < WZ �' 0 c O.0 - • a) comXr• � maz co 0 Lr) 300 m O j < WH (37< E x E 0 -00 0 3 OiQNCCCC NHQHcCF- u g a) � � J O z CC ~ (O� O a) ° � 0ZO7 WO (nIH0z p o E o , - wUo0 > - X E .. J73 0 * 0 (nH (n � H -II (C/) Q H J a. J * * 0 J J * * U I- U CX U) U O * * J (n J a. (n (n a. (n a. * N- r- r- r•-• ,- r r ‘- c0 O O O O N N N N v- LC) t) ✓ r r r ✓ r r r ✓ r r r • • cna � o a) 0 To ai N j OH J c j O U N CO a) LC) C L a) d N _o .O E _o C X co . a-. a) M 2 N In to U a) a (� O• EN -OTD Oa — O a c0 '6 L0 O_ .( O co •• 0_ W N Q J • 5 O N 'CI CO H N O *• ' J O c a) C o a) Q v7 ,0 E so fn Q u) V CO O J 66 a a O OU Q N) N .0 ( o a) 2 C Q c E (,) a) o c O 0 0JL) Q En u) cow ago �.+ •- , N I L f- W U) c‘j O .v C L r j iii O a0 C �) © U Q co — coa) Q J '( C N N E •cq J (co C _ a (� Q Q N a Q U) O_ Q v U C H �_ U) X Q`- O H a 1cs)0 O d O a) Q10 Y H _12 m c - NQ 2 iso N c�i � HQO � � * 0 u) * .cnaN O O O NO °' y- O � U �-2 - 0 : -0 O * O N cn �' a) C) N �LL ©* O 09 �acozQMb d o � � r` o � t` o > co _a *.o0LL- QO � a * m * Ji° rn rn oy ai '-- LO � H * ao2 > 2H z � d0 * J O Q CC) U) U) J ` O N Ur O -0 J W 0. � L,-, in rn u) .—, * • a) vi `n : Q N �m 40 � c0co0ar�oF- U2O O � � ._ 0 Y CD 0 ao E 2 ao a2 0O U) U) s L v7 7; uOi .3 oN Q ao Y cD 2 Q O U) m H LL- H -LL F- O_ ?i a a) ,- Q c C a) j ,_ O7 Z U a' O Y a J H 0 J O 0 J 0 7 a' E : N (n LC' a) ,- O H a. H W Q Q O '_ a0fi0E- c) 0in0CD r- 01= Loy- (tcn cnQQJQ ,- 11QHQHQN 00 � m cn mM aCD mi ° j ) -02 zoza _ aw u_ CQw2 co � 4t , H � Cp0 0 ' D 0U/) o c � - � Q0Wo2NNI- HYH WQI# WQ *k , Q <* H U � J� UQ i, -- 0 oIYJX � � — — H H H Q H H Q H H Q H ZCOXHfAHHCOH U) HHZ � 0H N c °- . cn Ozm wY W r. J O J W Q JU) Q JU) 2 JU) a0U>) 0_ , U) F- O cSD0 -r °° _r °° O- JJW O - H (/) - HO) JHU) —) HU) U > E 3N > H a cq J � UJHJHU) JJ � * D W O_ D W D W O_ D W Et * * 0 O ,_ * 0 O . * * D W D W CC D D * O_ U) J O_ U) J O_ U) J O_ U) J ; ; O_ -a O « r`+ J U) i ; O_ (/) O_ (/) J a a ; N- N. N- r,- O O O O N N N N CO CO CD N- r r r • S 5 0 ® \ _ _ U _ £ £ n »� _o / § $ o \ c (N a \ n / \ °- (.0 2 \ - o \ \ k , Ea-' 0 °— Qo 5n - % E f / / » \ 7E D2 a E < / \ \ \ / O J 6 7 ( ° / _ ° H _ £ ® F O § \ / / \ / / q S \ / U) \ \ \ 222 / � U / E/ g S w I f \ O » / R / § / � 0 \ � ) / ° / � \ > ■ \ fo k27 3 - / y7 o m4- m = » § ® 7 _ - c rCt co - CO _ (13 CU < � / � / f -4 � -0c� [ _ CD N / 10 0 ° k 0 / / / ® > / % m e 1- 0 O « � \ 7 on " � \ � / � � \ � o \ / k O / / O F i_l 3 R N - ƒ \ »- = y m > -J _� . n 7 � ± / @ 0 t _ = n = m I I . 0 \ ° ° 5 0 R a. \ n ) § N ° � m 2 / / / / N E O o / \ e 9 \ \ 4- c \ Cl) E J \ N / § / £ G 0 0 ( / / 0 \ / \ \ \ / \ \.- \ \ w / p k 0_ 0_\I 2 = e• c) a / \ 6 m 6 n G k ( a § \ \ / \ N• \ �# '\ / / \ / /_ \ = a o .- e e = $ _ = c _ = n $ \ & ) O w w 2 a f c 2 % \ IT) % } _ r 0 0) 0 \ _ 1 1 .- e .z $ R \ ® C26 = > Gc) » C0 G6 f % ., (0 o N § _ $ » $ \ 00 0 0 $ ? / C. 5 r) _c ) 0 (15 cr 2 a = o �� & 2 j �� ® / / ƒ 0 I \ I k § / I / em \ \ f k.$ ƒ / E m $ ? y x \ , ? -o / ® R 7 x i & % \ ƒ / 0_ $ ƒ / \ \ \ / \ ƒ \ \ / z ƒ \ / ,,-`; w w w \ N N W » o - eon N- / \ Ca CP L.) / TREE I- 4-1/8"OW1111 Z-O 6 A WELLHEAD= MCEVOY SA NOTES:WELL ANGLE>70 @ 9790'. ACTUATOR= BAKERC '4-1/2"CHROME TBG&LNR"'' OKB.ELEV= 91.97' _ BF.ELEV= 55.12' KOP= 3100' ' ' [ 2209'_144-1/2"FES X NP,D=3.813" , I Max Angle= 1010 @ 10535' (20*CO!` !CTOR 1 ? Datum Mt)= 9564' ST MO TVD DEV TYPE VLV LATCH FORT DATE Datum TVD= 8800'SS 7 2984 2984 6 CA DONE BK ' 16 03/21/16 6 5338 5009 36 CA DONE BK 16 03/21/16 L13-3/8"318"CSG,68#,L-80,D �— =12.415" t 2661' 5 6781 6188 35 CA DONE BK 16 11/17/17 I d 7521 6883 4 CA DMV [TOP OF 7'LNR --j 6681' {,--- I 3 8053 7413 8 CA DOi4E BK 106 06/11/041n/1127 2 8544 7899 8 CA DMY BK 0 06/04/12 1 8910 8262 7 CA SO BK 22 11/17/17 9-5;8"CSG,471#,L-80,D=8.681" —672$ 7 6581' —9-5/8'X 7-BKR HRD-E DN LTP ' [9-5/8"WHIPSTOCK(05/O6/12d—I 6728' j wl 11'TBR,ID=6.180 P 6697' 8'X 7'BKR FLEX-LOCK HGR,D=6210' ......_...------ Minimum ID = 2.00" @ 9125' 4-1/2" XN IBP STOP I "ALLOW'IMN OW(Z-O6A) 6728'-6762 ' [ 8986' .._1-14-1/2"HES X M',D=3.813" S X ! 9014' H7'X 4-1/2"FBS TNT PKR.D=3.856" I N 9049' _14-1/2'FES X NP,D=3.8131 9125' H4-1/2"FES XN NP,D=3.725" 9126' 4-1/2"XN BP STOP,D=2.00"(11/06/17) TOP OF 4-12"LNR H912T__.�..._.__i'� 9127 I—T X 5"BKR HRD-E ZXP PKR k 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, — 9136' w1 11'TIEBACK,ID=4.320' A152 bpf,ID=3.958' 9137' H4-1/2"MEG,D=4.000'i 9149' H r X 5'BKR FLEX-LOCK HGR D=4.320" I 9169' j—{5-X 412"XO BUSHING,D=3.88' r LNR,26#,L-80 VAM TOP HC, !--' 93100 , .0383 bpf,D=6.276' i g 9360'SLM—PULLED TOP OF 4-1/2"KB STRADDLE PKR UP HOLE,D=2.375"(11/05/17) PEWORATION SUMMARY REF LOG:SLB LWD ARC RT ON 05/23/12 — ANGLE AT TOP PERE::39"@ 9556' _ Note:Refer to Production DB for historical pert data SIZE SPE FIJTERVAL Opn/Sgz SHOT SO7 Z X 9568'-9695'1-4-1/2'LOUVER BKR STRADDLE PKR, 2-718" 6 9556-9692 0 06/02/12 D=2.45"(10/19/13) 2-7/8' 6 10835-10930 0 06/02/12 2-7/8" 6 11040-11140 0 06/02/12 2-7/8" 6 11180-11300 0 06/02/12 2-7/8' 6 11590-11680 0 06/02/12 LPBTD 11847' ._._—_ 11848' —14-1/2"WFD CEP(06118/12) 4-1/2'LNR,12.6#, 13CR VAM TOP, — 11953• ',lilt, .0152 bpf,ID=3.958" 1.4 0.. DATE REV BY COMvE NTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 06/02/88 AUDI#2 IMTIAL COMPLETION 03/24/16 JPKIJND GLV GO(03/21/16) _ WCL Z-06A 06/05/12 D-14 SIDETRACK(2-06A) 11/09/17 GJB/JMO PULLED PARTIAL PATCWSET FBP PERMIT No:"21201430 06/26/12 AK/PJC MAL DRLG CORFIEC'fIONS 11/09/17 Gi6/JMO GLV C/O(11/06/17) AR Na: 50-029-21798-01 07/09/12 DS/JMO GLV GO(06/29/12) 11/21/17 G13/JMD SET PX RUG(11/15/17) SEC 19,T11 N,R12E,974'FML&1323'FAIL 10/31/13 RMJMD SET LOWER STRADDLE FiCR(10/ 11/21/17 JPK/JMD GLV C/O(11/17/17) 11/11/13 STF/,MVO SET KB STRADDLE PKR(11/06/1; 12/18/17 GC/JMD PULLED PX RUG(11/17/17) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. p2 � a _ 0143 Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RES N: OVERSIZED: NOTES: Col Items: ❑ Maps: rayscale Items: gs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: AM Date: [[I 91 f /s/ PIP Project Proofing BY: (----mar— Y: Maria Date: ` ILi `if /s/ MP Scanning Preparation 3 x 30 = 90 + = TOTAL PAGES 75' (Count does not include cover sheet) BY: ari Ma Date: I /if. /s/ Production Scanning / Stage 1 Page Count from Scanned File: (Q (Count does include covers eet) 7 Page Count Matches Number in ScanningPreparation: YES NO P BY: �-_ -- Date:1 i iq. 1 I. /s/ f Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michel Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o 1 0 r; c a) o u) acr)u _ N p t N _ C C O r. Z c o~ E 2 0 u au- m E 2 U a N N to N j l 4 o to u) �U y E W_1 U co C+ _u) Q v u c) Z c a - v c3 2 Z 14) 01 0 �' 0 r;U J in LL 0 co Z r;U a N a- v) v)p m is oa �- &� " oa ZLL Za Z Z HO HO o_C) a 0 F-O a E C)0 O o a ,O ,O O O Z U J C O to C O - • - 1- E. .ate .ate H H Ua � w •ate a) m w > • o > a) Q Q c m a2 a2 o) o FO O (i a2 ui u- J o ~ -,No �~ ° m Ei_ O �22co~ (/ 41 tO y o OO co o J O 'n NNwJ 0 ON U Np C 12 15 c N u) 0 O a) 2'� O� oc v N N N N a)(Ni .c co 12 E (a.5 6 6 ci Z r aC1- 1- E8 Em cc as a U N aaa a s a aii it LE 2 L qi U ) UO N U + 0 COo �a E( d N O O EaEaCl) a �w cpc cc iOL t > > + •Ow f O O O O O U O I" ' QJ a up u Q EO UO (0 O c O cy •E'n •E C W a W 0 vi O c U (D4to 0 N 0 cc ei M M 2J 2J fn a c)J 2U 2 Ce2 2J (n w2 W w2 W W 0 0 C O N_ N N_ N_ N_ N_ N N_ N_ M_ _M M_ _M M M _M a U ,_ Y > O O O O O O O O O O O O O 0 0 0 CO •-y N N N N N N N N N N N N N N N N WO la y 'n in M M N N N N N M M M M M Ce J N O O f� h I- I- a0 a0 O) N �n In In In in CL w — c c c c c c c c c c W W a) a) d N d a) d a) d a) CL J Z S a a a a a a a a a a Z CO `p 0 0 0 0 0 0 0 0 0 0 0 0 (a 0 0 o Co M M co o c' M o Q O N rn rn N- rn rn J a �a O d °' / g C t O O O O O O M O O M M o .w 0 " 0vv LO v O a a O i EE " Z O U W ccC J R Z Q a coO 9 to z _ v co m, 0 0 0 Z N F J 0 0 0 C p o G } NI m W 4 /u ▪ N m (p J u) N N N N ��p/� O a ) A/ V� p o5 Q a, Z a cco iii Q o a 1 Z Z E Q E Uo J 7 y y o 0 0 0 )a > > o > co ca c c 77 17 Z com co m m m m o o m CO m m m a) m C c W w' W W 0 0 a CO CO m m m m m O C Eo o c c c c () c) ca c c 0 0 0 0 0 /o c m "t a) a) m > > E a) a) Ca 7o m m m o rt t; "t E d E E E E o o E E Ecr) a z In o o U 0 0 a) a 0_ 0 co 0 U o 0 0 0 0 M 0 O J ` y a) CO Co O) O 0 M M O 0 0 0 o o F= `m u w E r- CO U) _0 CO CNI m N. (N N N � N I < Z L C N l0 7 N N N N N N N O �+ .2 W p z 1 N N N N N N N N N N N N N O o H C (o I a € � z C w ' E - 0LL 17 V 1,- 5,- V Cl)G ((°) p Ou C < Cl. a a s a i i ce Z W c p2 0 0 0 0 0 0 0 0 0 0 0 E 5 ¢ w J ag wCLOOWw WWWWWW O & T _I -I w w ° J W W I FG F 11 / 11 7 0 0 9 CO N I CO a Q 11 to 0 U 00) r r w .r • Z I O CO CO co O 'O y -0 v 'O co oI ZI O N N C C C a) o CC ).. p) a) OI OI O co In J o) _U o 0 0 o Z_ Z_ Z_ 1 d a Q D aa)) >. >. >. aa)) p a) Q a a v II F- 00 0 2 Z 2 Z Z a g U N in aO NI NI NI Q I-1 0 u)L.L. F- O 0 u) u) u) 0 o v c>- >- >- 2I U UI a1 d Z F.Z W c c c w c c T o acid < < v) w co N cn M 2 2 I Q LL IL IL IL LI v d ami IL co c+) co I NIc7 m cao OQD 000 CO(0 (0 Z Z = r r -1-1 I-1 F-1 cao cc w d1 w 9 0 0 0 9 a) a) u) o 0 a) a)g 2 2 0 U I a 0 O 'j N N N N N U u) ca N N .v 0 U 0 O Nw J m J = Zaix ui ui ai a) Z ii aa, CO�1 0 Cl)I 0 UI 0) a)_ W F-1 (Cl- - D CO U- CO it LE it it 0- d d d 0 ii ii ii ii 1 ii a i.i I c Q u) V X u u u V v) Z o co a co0 0 0 V o V 0 z 0 a uci 0-(1) a) 1 a c v c c c .s 'c > 0 > 0 < + 'c N 'c N 'c N 'c 'c c 'c o 0 E m o E' o 0 0— o Q — 0 a C/) € i 0 1 0 1 0 1 0 0 2 ocecn oN Cc) E cn Q u) U 0 U U U U cD p co-O CO o `C U U U U U 1 U I J U O a o J a) m a) a) a� 0 0 0 0 o c y 0 d a a�a a�a d a�z cn a�z 0 a�a N w U LL a c w O) LU LU w� LU N2 N2 N it a 2 El wm wm w WR71 wRO w2 Ni 0 Z ` °' Q O M co co co co co M co co co co co co co co co M co a a+ zi a 17- U o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o EN E W g N N N N N N N N N N N N N N N N N N CO 7 M M M M M M CO V) Z IX M CO CO M co co M M M M M N N N N N N N O L in in in u, n n - N. N- N- .h.-- 0_a X c c c c c c W w J O. 0_ O. O. O. O. ) m V m p O O ! ! ! O re rn rn rn oa v rn O N r a) co co co co Oo C-4- E o V U Q co 0 r N O Z N U V) 0 ca N /� W Qc CO In c0 N w • a) t a M Q ao a) < c a 0 Z O co d U E um z rn co CO CO CO CO CO CO ;a co co CO m CO CO a) m m m m m m m m co CO co m m is CO m -0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ca c NI- a) 0 o Ta o m m CO CO CO CO CO CO CO CO CO CO I o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J E M0) 0) 0) 0) a) 0) 0) 0) 0) 0) 0) a a a V a V v v w N N N N N N N N N N N 0) 0) 0) 0) 0) 0) 0) 0) C o N. n I N- N- N- N- r` N- r` r` 0 0 0 0 0 0 0 0 N N N N N N N N N N N N M M M M co co co co N N N N N N N N NNNNN N N N N N N N I d a m EE F co z 0 Lc) v a o co 1° rn a a a t o ✓ — O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i p 0 co a a 0 0 0 0 0 0 a n a CO 0 0 0 0 0 0 0 CI)o I m a w w w w w w w w d' CC J w w w w W w w J il3 I 0 o CO I ZI Z Z rn N Z 2- 2- 2- N co O L j. a o in E a U a f0 1 Q N N 2, V O PR Z Q /Q Q J 65 / m /N O Ce Q N N a ii O Z 7 f4 f0 a U -• a W/�/ ° j I.L J • f o a E W x °' co v; cu V w J m rn o. m O o E J m Zco Qr N 0 • 0 0) f J a. C J N a c v E m 3 0 .3- Om O U U 2oM a O N a N Vco fZ Q m °9 co / N Z N •O p p 0 C Z' Q iiiC▪ co E m coO E M O d 5 '^ _ • 01 NiiM A ? CO p c C O 11-1M4 _ ,!< d O • U N , LN C a 1 Q cZE a• O - mC OT O• O '. a> MO 4 ✓ >- r v >l O /� m p co o 13 N U o o 3 N UJ 1 C ZN N Y O C) Q O CO C I' C O U O) E W O. 7 O E a E y 0 O O E N o o a 2 Z U a C7 0 U STATE OF ALASKA RECEIVED AL,AKA OIL AND GAS CONSERVATION COMMISSION DEC 1 6 2013 REPORT OF SUNDRY WELL,rVOpEGRiATIONS �+ 1.Operations Abandon U Repair Well U Plug Perforations LJ I' F�erforate U O • ther Nj U AlPage hies Perfs Performed Alter Casing III Pull Tubing❑ Stimulate-Frac ❑ 1` Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4.Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development Exploratory ❑ 212-043-0 3 Address P O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-21798-01-00 • 7 Property Designation(Lease Number) 8.Well Name and Number. ADL0028262 A�Lao2'2�6 PBU Z-06A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL • 11.Present Well Condition Summary: Total Depth measured 11955 feet Plugs measured 11848 feet true vertical 9040 11 feet Junk measured None feet Effective Depth measured 11848 feet Packer measured See Attachment feet true vertical 8975.8 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"Conductor 34-114 34-114 0 0 Surface 2625 13-3/8"68#L-80 34-2659 34-2658 99 5020 2260 Intermediate None None None None None None Production 6694 9-5/8"47#L-80 34-6728 34-6145 31 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 9556-9692 feet 10835-10930 feet 11040-11140 feet 11180-11300 feet 11590-11680 feet True Vertical depth 8882 77-8973.56 feet 8953 61-8938 08 feet 8918.78-8900.55 feet 8893.09-8874 79 feet 8878 87-8902 88 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 32-9137 32-8487.53 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation 690 5036 120 0 273 Subsequent to operation 1034 5793 148 0 270 14.Attachments 15.Well Class after work. Copies of Logs and Surveys Run ExploratorL❑ Development❑✓ • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil ❑✓ • Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCC 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O Exempt N/A Contact Garry Catron Email-Garry.Catron(C7BP.Com Printed Name Garry Catron Title PDC PE Signature Xevldil, C Phone 564-4424 Date 12/16/2013 rt-r- 170// RS;ME DEC 2 0 2013 Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment ADL0028262 SW Name Type MD TVD Depscription Z-06A PACKER 6592 _ 5944.01 7" Baker ZXP Top Packer Z-06A PACKER 9022 8284.94 4-1/2" HES TNT Perm Packer Z-06A PACKER 9138 8399.8 5" Baker ZXP Top Packer Z-06A PACKER 9546 8786.23 _45 KB BKR Packer Z-06A PACKER 9695 8886.46 45 KB BKR Packer m 00000 • � Coo OCO C �) 1- N CC) C L[) ti N r- V c9 Or- N C) 7 N CO O r- COCOuCO C'7 0) CA CO 0 CO V) C) LC) Ci co' CO CO 1-: U) el Tr co a0 CD0 — CO4 CO CA CONCO v- LO CD! MChN: Mcc N ) C') f� ONI- •Ff CO CO a co N LO M (Y) N- CO L 0) CO N CA C.) CONCI $+ CD 2 Q N 03 NI- CoNNI- N 8) N ChCD 0) MC'1) M C O J H 0 O 0 Q c200ao w 0 M J M 7 co J-J "• O J CO (f) N C % CO NCO CO CO N 0 c V N pO V O f� CV tn. CV N (A 4 t +-' CA CO N U) tC) DO N N O) N O ccoN.. coCOCO � J N N CO N CA • Z • O CD 1— I w > > U O 630CL Q OLLLZ UOZZc D O i a_ c.r) J L 0 0 0 0 W o Q Z < D 2 os O oO0 � � � as c _ O o t` � J I- UD U) (n ti 412 il Y CX L0 � � ininN U) cc < 00 - W M M N- (/) (6 (6 O (6 C 00CD as av . aH0 Z EU YUY p W 2 J W aUdd0") (j C6WCL W Y Y O 0 0 0 _ o - 0 0 m aaQ Ow W aim IDC 01- 00 CC O O X • w � � w t00 . . � . 0 Q OQ Q D � Z vza n " Z 2w ~ I CO 0 0 0 J WH CC w W CD Uj C DJJ W � D O) O) - U) 02 * U) Y W CC UD O F- c 0 m m D J CO NZ J * fX W cc 0 ODDD o -; rnrnNrn 0 Wri v ,n w Y O W Q "= �YYa rna 00CC00° - Q UJ Co O N �i o � 00 D -�F— I— W f- 05 H a DLUc9z E0000 tea- owwNwH@O 06' 00 -p I-, I— W O EUco ) Z W Q 1- a o (n (n (n 0JM o00QOalLa_ Z fQa) D N 2 4= Ua_ a_ Ea ;PZZa2O - F- aoo CD O C <E U) Q2 >I> S>> Y N a I * O J J Z a O' W U) w Up Wa, J * Z » OC * pz0 �DDW DOa. Q * 10 11 0 O Q '§ (N * X >_ >_ O * ,C,1;5 co mmUm1ma J UQIW Q. �oP * V) m Q * Q (*� ot5 O o($ X wa rn H d U) d * U� � � U) DDYbE> * Qa -- -, -, COi -, oCIO Q c W WOCD Ce LI 2! Q 0, w DDcncQOz Z <-- CL j. CLm j � CCCD <C QO >, < 05 ,- 0bb - < > zU) 0 I� DDZD � Z Q � Doa_ 5 (r, c7QN aaZa (� Za Z � (DONO (n � 3 CO 0 � ~ vcfl0 x x � O � ac, OW ObbOENOw 010C) 0 --I'- Q _ UJ • > N a m b b N z Q O 0 D 0 ~ N E. N Q 0 Z (p u_ b J W up H W - CI - r- U) Zcno Z LLririQco Z o0 ?� I� W � Oo � Irico � F_ 0ol� H F- x x > x `r > O H ii 40CDU ,- a �, ° o � cmn � � � � 5 ° "' 0 0000oY0- UJ 5 Ioa � - � I� . JOH CDDDJJ § § U V � � � � �iC) J _J I-- II CV W E- O 0U) I~i I~i I~i W W I~i UL O O IIi IL U I~i U. U CIO CI:1W W Q U- ' Q J m i> � UVQEEEEEEi' EEBEm : ? � � p � oct i; E, zo * D * * x 0 0 0 * * D 0 Q* * D D D D D 0 * * - OC N I- co 11 * M CO M M co O O O O O N N N N N 00 d N O N N Cfl CO 23 I I I I I ;4- 0 0 0 0 0 0 10 F- H I- H F J J J J J 0 Q C < < < < < 0 w N V) u) u) (1) (1) 0 0 ▪ IL LL in tL u Q 0 0 0 0 0 J CL Li- • 0 0 0 0 Cl. Z a rn 0 0 0 0 0 ° 0 oi 0CD • CD CD CD > 0 O CD CD CD CD >- Cn (j H H H H IQ- Q O Q l- rn U) chi) chi) u) Y Ow ai < < < < < C) w Y 17- C Q 0 0 0 0 0 a 0 0 O On Q Q Q Q d _ -_ Q Z 2 J J o a J 2 J 2 J aaaa w a 0 O _la u) Q u) Q wQ u) Q co Q 0 CL 0 Ct- -OM NZ oZ � Z � Z NZ a- Q N O - (3) u) Cam -0NO rnC COU 0 D CL CO E (0 LL (0 LL 0 (0 LL Lo LL LU LL a LL O d co a) f a; 0 a; 0 Ern 0 Oi O am 0 - 0 E LU o(NI o a 0 1 OO I °t 0 i 00 1 � I- C)' I = 0 t1- 1- C (21- 0 a o Et Et o < - 0 QD cn QDQD Q � QD LL a 0 W a.00 a j TREE= 4-1/8"CNV VIEELLHEAD= MCEVOY Z-06A SAFETY NOTES:WELL ANGLE>TO @ 9790'. 1 ACTUATOR= BAKER C ***4-1/2"CHROME TBG&LNR*** OKB.ELEV= 91.97 BF.ELEV= —_ 5512' KOP= 31_00' I I. �' —4-112"HES XNIP,ID=3.813" , Max Angle= 101"@ 10535' 120.CONDUCTOR I ? Datum MD= 9564' ST MD ND DEV TYPE VLV LATCH PORT DATE Datum ND= 8800'SS 7 2984 2984 6 CA DOME BK ' 16 06/29/12 6 5338 5009 36 CA SO BK 20 06/16/12 13-3/8'CSG,68#,L-80,D=12.415" H 2661' I 5 6781 6188 35 CA OMY BK 0 06/04/12 4 7521 6883 4 CA OMY BK 0 06/04/12 L P OF 7"LNR I— 6581' 3 8053 7413 8 CA MY BK 0 06/04/12 2 8544 7899 8 CA DMY BK 0 06/04/12 1 8910 8262 7 CA OMY BK 0 06/04/12 9-5/8"CSG,47#,L-80,ID=8.681" "6728 li 6581' —9S/8"X 7'BKR HRD-E DAN LTP 9-5/8'WHIPSTOCK(05/06/12) — 6728' WI 11'TBR,ID=6.180 6597' -{9-518"X7 BKR FLEX-LOCK NGR,D=6.210- Minimum ID =2.375" @ 9546' MILLOUT WINDOW(z-ora) 6728'-6762' 4-1/2" KB STRADDLE PKR I 1 8885' 41/2"HES X NIP,ID-=3.813' I E 9014' —7'X4-1/2"HES TNT PKR.D=3.856' ' I 9049' I—4-1/2"HES X NIP,ID=3.813' ' 9125' —14-112"HES XN NN,ID=3.725" TOP OF 4-1/2"LNR 1— 912T 9127' —7'X 5'BKR HRD-E ZXP PKR 1 4-1/2"TBG,12.6#,13CR-80 VAM TOP, H 9136• = _ w/11'TIEBACK,ID=4.320' .0152 bpf,ID=3.958' 1 I 9137' —4-1/2"WLEG,D=4.000" 9149' —7'X5'BKRFLEX-LOCKHGR,D=4.320" 9159' —5"X4-1/2'XO BUSHING,D=3.88" 7'LNR,26#,L-80 VAM TOP HC, 1— 9310' , .0383 bpf,D=6.276' PERFORATION SUMMARY C 9546' 4-1/2"KB STRADDLE PKR ASSY,D=2.375" REF LOG:SLB LWD ARC RT ON 05/23/12 I (11/06/13) ANGLE AT TOP FERE:99*@ 10835' Note:Refer to Production DB for historical perf data 9695' —4-1/2"LOWER BKR STRADDLE PKR, SIZE SPF INTERVAL Opn/Sqz SHOT SOZ C D=2.45'(10119/13) 2-7/8" 6 9556-9692 C 06/02/12 ' 2-7/8" 6 10835-10930 0 06/02/12 2-7/8" 6 11040- 11140 0 06/02/12 ' 2-7/8" 6 11180-11300 0 06/02/12 2-7/8" 6 11590-11680 0 06/02/12 ' I PB1D —I_ 11847' 11848' —14-1/2"WFD CUP(06/18/12) 4-1/2'LNR, 12.6#, 13CR VAM TOP, — 11953' .1.1.( .0152 bpf,ID=3.958' °AVM DATE REV BY COMuU'ITS DATE REV BY COMMENTS PRUDHOE BAY INT 06/02/88 Atm#2 IMTIAL COMPLETION 06/26/12 AK/PJC FINAL DRUG CORRECTIONS WH..L: Z-06A 06/05/12 D-14 SDETRACK(Z-06A) 07/09/12 DS/AID GLV CIO(06/29/12) PERMfT No: 21201430 06/14/12 PJC DRLG HO CORRECTIONS 10/31/13 RM'JMD SET LOWER STRADDLE PKR(1011 AR No: 50-029-21798-01 06/15/12 PJC DRUG DRAFT CORRECTIONS 11/11/13 STF/JMD SET KB STRADDLE 802(11/06/13) SEC 19,T11N,R12E,974'FPL&1323'FAIL 06/17/12 TJFY PJC GLV CIO(06/16/12) 06/19/12 RMWJMD SET WFD CBP(06/113/12) BP Exploration(Alaska) (:)..... t.„2„ ........... 0 z.......f 9 c.)_)\_ '1 4 .. ,.., , .0 0. . . c,, .c-1. 2\ { 0 , §) t 0 0 . § \ \ \ \ MSM . !e ; / / 2 2 i \ \ /ƒ - /k § \ y are� cc- e22 ' 000Q 2 ) Q © 20 °= - z a � _ \ ),� )( \O | : _ }\\ / ) \ \ < )� )� _ §2\ / kk \® §Fe §� » 2/y Lcsi 0 ) \\\� h h 2 u mzm� 0 / ▪_ » arc 5 - � � » 3 0I \\k 2 � �\\ \ \ OC - \� \\ 0 I i §\ g ) §< E — = a i U � , . ± §a ) j \ fa o § \ ` 27 , 0 ~ §) ƒ\ -� ` .y ] a ! ao sa 13 }� \\ 2 § \ ��k ° * « ) ■ & & j22 \ ` C } / \j \ fza < b - Zm U cq " �, 00000000000000000000000000000 0 UC.) U U U U U 0 U U U U U U U U U U U 0 U U U 000000 E CC 0 2• ' C) rn fC U L, 0 a i) o 13 �,ci .r... , — 4 .......3 4:) z E" 5 $2 *--Z c . •••••••.., I- c6CI3 N T N N e' N M M N N N 04 mi M N N> N N N 01 M MC" CI T T T NT -. T T T TT T T T T T T... ) ZY 03 „--, "4 - W ' - irA . UT T 3 10 G C Q C0VI L. L• CU QU 7 Ud 7 U 3 0 j jQ d70C0 7 g 21x LL 7 0 z 0Q 2 ) ' Qz 7n n7D ? 77 ? MOOu) N NO . 00 4 h T O O n N O N co O O N N O c It- N T T7 N N fTT M Nn N N N NN �4Z J -I J W 1.- z F- F- 1- Z Z (c-13) ) O I- --'Ar-i-,1001-N)...911” V ce. Q.' D: ( W N LL LL LL LL LL LL LL LL '� J J J J J J W W ` O O O O O O O O`` Z Z Z z z Z z, g c\ G F- F- F- U F- F- F- F- a Ce \ � F- FI- I-- F- F- F- ►- 0 en N yy co to � U U U U U 0 O 0 0 0 0 o 0 0 p cLceM , D 2 2 2 2 2 2 r4 CL0_' rr a} .J W W W W W W W W LL LL LL LL LL LL L6 LL LL LL LL LL LL LL Cr 0- O O O O O O O O 0 0 0 w 0 0 0 O O O O O O O O O J J 1- F- F- > 1- F- 1- H F- F- F- F- F- I- F- F- F- 111 ►_- z z -1 o 0 0 0 0 0 o W w w ce W w w w w w w w www ce c4 2 = 2 2 m ;...0, a 7 lO W ( .,17) X X X X X X X X X X X X X X X X X X X X X X X X N N i 1L TI ii N cn 'u. X XX XX to Z To Q ooc _C 0 1- ti in 2 co) '0 L�yj ,.. Q) O in N CO M g T SCJ O T 00 T M O O <p 00 in M O2 N Cq 1n S r O O O O T O N O O O O O N N O O mr T O p 0 0 0 D O O D O CA °a CSC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0 0. 00 0 p' 9949 9 C 9 o o o 0 D co 0_' u) a00o 2 2 Z r -) X 0: o o M 00000 d 0 0 U Cp W E Q X O 03 Q s! d' } U 03 O LL LL M m N CA U CO CO Q CO Q X CO N LL X T LL J 0 O mow °•_,' o m CO m U U CO CO CO m U U U 03 U U CO U U 01 U U CO U U U 03 U U U U O i N Q. v 0 v Q a J'.. ; a Q co U m U c0 0 Q T O a Q Q 00 Q U CO U T N 00 1- 7 M N CO m 0 N coc � w E m u W N p 0 0 -T- , O , .7 0 M .0 T 0 N p a VI Z — a 9 9 cum m 4 Z m 3 : p Y c OTO N Z co -1 o N 2 LL = W o o M T 0 o N et 0 LL m t w t7 0 .. coN N N r 4: ct_ t la • L 7 / 7 I/I 1111111bp Date 9-28-2012 Transmittal Number: 93258 0,1a - optt3 RECEIVED BPXA WELL DATA TRANSMITTAL SEP 2 8 O 1 Enclosed are the materials listed below. (BPXA FIELD LOG DATA) AOGCO If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 15-09B 2�L a2-4 i 5 C-02A 1_V-ot5 J-16B Z\2-ay -> ',2x'R J-16BPB1 Zl20'4 2a946.1 J-27B =l2-O31 2-\'11 P2-51A 212_-ov`t P2-1AL1 \O Z-06A %.ti -I Z-11522 C Please Sign and Re urn one copy or this transmittal. Thank You, Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 2t 19 0 cc o • m0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 000000000000000000000 • J v .-. O O U <11 r x N Ti s,Ri ,c, z r r r r 0 - t U0� 0 n > cu Z E4 o I•rl N - N X01 :-3 H Q1 rn w LQ '. z r r r r r r CLi' O W 2 al ,7° v 01 - Cr, ►v+ 0 c E 1--1 i m Q CI tri c�} GT N N N N N N N N Ni e- N N N r N 1- N N O N N Y U N r r r r' r r r r r r r r r �- r, r •r •�. Li-) ion 1.1.3 LIJ ro a/ —,• O r-• F-; C7 3 7 3 j 3 7 3 j - j n 7 . j 7 j 7 i f6 7 3 =�, UJ N O � �' tN N CD N 0/1 0a fel N N U c et, ' N r N rrr x a D Q CO tu co J Z z 0 h F- Z t------..0 ,r)t :fk � 0 _0 0 0 0 00 f- t� = 2 U 0 LL = S O` O p w C7 O 0 w ate, za5 re w - p w -§ ' w V. o LL LL LL 0 LL LL - LL 0 LL LL 0 W vl O LL IXd' J eY a CLCC < 8Y d CL Q' a D0 91 A 0 a. au a s 1.1.1 II. m 0. CL Ili 0', d cc el. d J e1 J d d rt el el a J o' >- a- > >- >- >- >- >- >- 5 >- >- r _ cc cc ctcc c' rx Q' cc 0 w LL LL LL ce re ix waw w 9ti Ill w w w LL 0 CT),ill LL a a. a Lu O w LU Ea. 22222221- am2xcia. a. 2 co 22 z 1_ W( _N c G�cc N a u m N > Ili z w N X X X X X X X XIX X X X X X X X X X X X X i- ex u!. 0 0 cc cc. 1' 0 a CAd IMO J an xc en tell CO r V N r CO ea et ‘zt e9] ate 03 co o u co no tNi j; w , ® o n- ® ero - c, . ® o o - ® > >Et et ® m ® o T a Cui w�. O N 0 0 0 0 e3 X X X n rA co ar sn 03 0 -a r- ,�; + a ¢, co a op era ara AD < N �i tiV 0 >- a. t2. C) a Q a) co v, Ca m eno r, , co to 0 c u 0 u 0 CO 0100 10 CO 03 02 a <{ al e3 00 c O > Cr) e CD on -io in ; co m Ci az Cf fp te) Dm 4-1X C ( , .0 r, c Q uiw E u Llr !y N en r r r Z ca m 4.'-'" C, C2 Y > N o = d el ® J J ® GJ N a m p Z 0 :t 60' o o a s @ a Cli 4.4a co = env u y; -,. v a O c n 0 r w 3 a {� 1 x a. m rn Q 2 2-°A3 2`74.` :, [1 , C 0 • L. 1 .4") Cf) ,,, \,� Vf 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W A7 00000000000000 v U .. r-: 0 • o • :- U CI 4.i OH z r O ...r ti -.l r r r O O i.. L. o 0; 2 (1) ,z00 o u, o_ > Q Y Ti O di v m �'(� �� CA C.n z r r r r r r r ,- ,- r- O 4J Ln 0 (CS OLl':, C0 Ol � ^'i 1.-106 c Q �-4 0 0.6 w3 tl-' )v N N N N N N N N N N N N O C7 N `,, 1. _ ''� 0 r r N . . . . . . r r r N r +-' L!1 pp Ri O 1- w C C r >` C. ) C C C C . e- . (� �_. 7 7 7 7 7 7 7 7 7 7 7 N N O 1-i ,. ,-^ Q co O '7 r N r CO O 1.0 Cr) to 10 r 41 U C =i CQ '.� r r co M r M r r r N r XE-40 < t 0111 C• � Ww J < J w Q' z zH z W`'\ ..„ y _ W W W H 0 W W W 11.1 IX w o § w Ce _ _-1 a s 0 = t1 tl 0 d. LL Lit' a a Y I- 0U0 1- a 0 0 W W Q W a a 0 W W W a www a 0 ,.,.5 F- F- J � a 0. J J H Z o >- >- >- - >- w r >- > J >- >- O -I, Ce Ce Ce i-- Ce v Ce X CC LL LL CC (t 12 • O O O F- O i- O O O o O O O ix W W W 0 w U W W W (n o. w W n , 222 (02 co 222cco_ 22 toi NO ri N 3 O A Q N ik `J W 2 .f V1 X X X X X X X X X X X X X X I- 0 ▪ Q g O . I I 0 •CA U z IIIME fr uitt ... — ,...y!„ - mm r . r O In v O N , M N co H �,'S w ,0 O r 0 0 p O 0 p r p O o o ,v _ 0 O O O O p O p p O O O p O p >- •c CY O p Q O O Oi O O o O' O' 0.O F.- O Q .=j O CD O Q N CXA N [Xf/ (D N N YX') O M N co N I� ) m %l" U U D 0 0 0 0 0 0 m 0 0 0 0 C 0 Q r 5 d N CT N vi Eta) Q ^ „ Y Ow = • <n - N y O rt (,Il rn Q c - O Q d • 1 a Q w O O a M Q ler") m[) h O r r N CO 7 N in N •iO O r 4-' cG C to d 4t w of N ;a J M ® M ® N N m (7 CU J '� ? on u Q z z a N J 'a d a Z CU U m co to •v .= 2 M m Z 0 (' 2 N r N O > Vr O s o W LO L O ro a o WO 0U n. .' T' N v a m o O ✓l 0 CO5' N < VII x O co rn Q - 2-\2--04 3 cC) ;: „, cn �, w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u) `1 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r V r• ou . `' U `-, o _. R+ cc H �' O � 0 _ r- r <- r O o 1J V J. z + i.4 L O 0 Z F Q .p N 1n CD zn rr a +- m M j1,1 C� ) Z r r r 1 ' r r pCin p N O PCI 0 (Ct J: m `^ ^S l� 0 o fo E W ~ i CO Q VI "L N N N N N N N N N N N 7 C„ 01 0 -' Q .— N . . . . . . N .— r N r 4-' Lf1 00 Z c4 ' •' W, W C C. 7 T C >, C C C = C C 7 C v � ro RI O �„ Q, C7 33 fa 3 CU 3 3 3 3 3 3 3 3 cu N O ,"'4 }-4M O x- N a— 00 O to 1n ti ct 01 U C 03 M C9 ,� — a- co M - M e- r p N <- x d Q Q '1 `3 > > Q O 'c- --..._ 1(--1._,0f z_OD cn C/) I a. O 17 N F O; U) Ute) tel) W w - W W W F--: Ce W w w -§ w Ce J E< a a 0 = LL oL 0 a u �.` a a Y 1- O a O F- Y n. O w Q ca. CeO Ce 0 tL Q E ce 0 W W W W a a O W W W a 0 H H J 0 a c- a J 0 J I- Z O: >- r r - ›- r J O CtC[ W ti Ceci cc cc w u- LL ce cc R. 0001- 01- 00011000 w w w 00 W 0 w w w ~ CL w W 55ECl) SCl) 5E5reaESi W 2' Q N O 71 N 3 3 0 .1;, F— N LA Q N tL Z u ( X X X X X X X X X X X X X X CCY= O O F Q C/D OD CSD • 0 0 2 c4 Cr) M CO 00 to OCC) h •M N co N w pp ,— p O p O O p p O p 0 +J Q O p O 00 0 0000 p 0 0 0 �' C or. W O p G O O C O O p Q C 8 C C O v w a a N; O o Fi- -. -U) X -) X X o o X . Z O V- �� _ CO O < N N N 1A to cO N N 1$) 0 M 0J 00 C 0 a p 00 m 00030000000:10001) an 73 Ln O U N Lf1 N '7 > 01 co c a, cTom ri °' =I N o to Q i c Q d N Q al w O 0 a M a CO N CO r N OO 7 N ° Q) 01 a1 1] CU C•U - J 0 M G M O N N m O , v C 0A 0 0 c .>_ w E 1w w Q Z Z a N J n a a Z °) U CO s 0• = 0 O O z U° C7 g N P It N CO E E O Q w CO Cl- v a 0 U c inn 0 CAZ Niz,i ¢ x a m al Q 2^ D-4\� y'i,� „ ni3 Schiumborger 22_7 z( - y_ � _: Drilling&Measurements MWD/LWD Log Product Delivery Customer BPXA Dispatched To: Christine Shartzer(A0GCC) Well No Z-06A Date Dispatched: 31-May-12 Installation/Rig Doyon 14 Dispatched By: Chirag Raisharma Data No Of Prints No of CDs 1 Surveys 2 Perform Letter 1 Logs: VISION Service MD 2in 9609 to 15778 1 PDF included VISION Service TVD 2in 9609 to 15778 1 PDF included LAS Digital Data Please sign and return to: Analisa Steger Received By: BP Exploration(Alaska)Inc. Petrotechnical Data Center(LR2-i) 900 E.Benson Blvd Anchorage,Alaska 99508 Fax:907-564-4005 e-mail address.analisa.stegeribp.com LWD Log Delivery V1.0,01/22/2010 Drilling&Measurements \1,'o 2-\Z-0<n 2525 Gambell Street.Suite 400 Anchorage AK 99503 Ac) c Schlumberger Tel(907)273-1700 Fax(907)561-8317 1 Z Date: May 28,2013 Well Name: Z-06A Company: BP Exploration(Alaska),Inc. API Number: 50-029-21798-01 AFE Number: X3-011RK-C:DRILL Location: X=599,046.05 US Feet;Y=5,959,100.11 US Feet Field: Prudhoe Bay Rig: Doyon 14 Drilling and Measurements Field Support: Operations Manager, Mario Pepe Field Service Manager, Brian Muzny Drilling and Measurements Field Crew: Cell Managers, Chirag Raisharma Arina Fell Jessica Dake Cell Engineer, Mark St.Amour Ian Carmichael SERVICES PROVIDED Z-06A Services Services Dates Depth Intervals Directional Survey Service 06-May-12 to 26-May-12 6728 feet to 11955 feet TeleScope*Direction&Inclination 06-May-12 to 11-May-12 6728 feet to 9312 feet IMPulse*Direction&Inclination 14-May-12 to 26-May-12 9312 feet to 11955 feet VISION*(Resistivity,Gamma Ray) 07-May-12 to 26-May-12 6764 feet to 11892 feet VISION*(Neutron,Density Azimuthal) 07-May-12 to 26-May-12 6764 feet to 11863 feet OPERATING STATISTICS Total MWD Pumping Time: 222.5 hours Total LWD Pumping Time: 214.5 hours Total MWD Time below Rotary: 406 hours Total LWD Time below Rotary: 375.25 hours Total MWD Depth Interval: 5227 feet Total LWD Depth Interval: 5191 feet Total MWD Runs: 6 Total LWD Runs: 4 Total JOB PERFORMANCE Directional Z-06 The final MWD survey point was located at 11890.40 feet with an inclination of 52.27 degrees and an azimuth of 273.30 degrees. This direction and inclination was projected from the final survey point to TD, which resulted in the following bottom-hole location. Measured Depth: 11955 feet True Vertical Depth: 9040.11 feet 1 Schlumberger Formation Evaluation 8-3/4 inch Intermediate Section: The intermediate section of the well was drilled from 6764 feet to 9312 feet MD in one run. A motor was used for directional control during the run. Resistivity, Gamma Ray, APWD, Density, and Neutron data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom- hole temperature was 157.6 degrees Fahrenheit. 6-1/8 inch Production Section The production lateral section of the well was drilled from 9312 feet to 11955 ft. MD in three runs due to the bits being worn out and having to change the bits. A motor was used for directional control during the run. Directional Resistivity, Gamma Ray, Azimuthal Density, and Neutron data were supplied in real-time and from memory once the tools were retrieved. The final measured bottom-hole temperature was 164.3 degrees Fahrenheit. Innovation Implementing compressed ORION data points in our Real-Time frames when high tier formation evaluation services are requested or high ROPs are anticipated is recommended. ORION data compression techniques will provide excellent data density for all evaluation needs allowing more data channels to be sent uphole and greater log detail to catch fine geological features. Schlumberger Oilfield Services — Drilling & Measurements appreciates the opportunity to provide BP Exploration(Alaska)with MWD and LWD services. Sincerely, Ian Carmichael MWD/LWD Engineer Schlumberger Drilling&Measurements 2 RECEIVED STATE OF ALASKA JUL U 2 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT ANDAMCC 1a Well Status: IN Oil.❑Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class: 20AAC 25105 20AAC 25110 ®Development. 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name' 5.Date Comp,Susp.,or Aband.' 12 Permit to Drill Number: BP Exploration (Alaska) Inc. 6/5/2012 212-043 • 3. Address: 6 Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 5/7/2012 50-029-21798-01-00 • 4a. Location of Well(Governmental Section)' 7.Date T.D.Reached. 14. Well Name and Number: Surface. 5/21/2012 PBU Z-06A • 974' FNL, 1322' FWL, Sec. 19,T11 N, R12E, UM 8. KB(ft above MSL): 88.72' 15 Field/Pool(s)' Top of Productive Horizon: 1317' FNL, 1099' FEL, Sec.24,T11 N, R11 E, UM GL(ft above MSL)' 55.12' Prudhoe Bay/Prudhoe Bay• Total Depth' 9 Plug Back Depth(MD+TVD). 1103' FNL, 3405' FEL, Sec.24,T11 N, R11 E, UM 11847' 8975' 4b. Location of Well(State Base Plane Coordinates,NAD 27)' 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 599046 y- 5959100 Zone- ASP4 11955' • 9040' • ADL 028262&028245 ' TPI: x- 596630 y- 5958726 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit Total Depth'x- 594321 y- 5958911 Zone- ASP4 None 18 Directional Surve y ®Yes ❑ No 19.Water depth,if offshore' 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 122. Re-Drill/Lateral Top Window MD/ VD Dir/GR/RES/NEU/DEN, USIT, Dir/GR/RES/NEU/DEN 6728' 6145' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 260 sx Arctic Set(Approx.) 13-3/8" 68# L-80 39' 2662' 39' 2662' 17-1/2" 4000 sx Permafrost,279 cu ft PF 9-5/8" 47# L-80 38' 6728' 38' 6146' 12-1/4" 2135 cu ft Class'G' 7" 26# L-80 6581' 9310' 6024' 8659' 8-1/2" 249 sx LiteCrete, 91 sx Class'G' 4-1/2" 12.6# 13Cr85 9127' 11953' 8478' 9039' 6-1/8" 256 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD (MD+TVD of Top&Bottom;Perforation Size and Number): ) 2-7/8"Gun Diameter,6 spf 4-1/2", 12.6#. 13Cr80 9137' 9014'/8366' MD TVD MD TVD 9556'-9692' 8883'-8974' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10835'-10930' 8954'-8938' 11040'-11140' 8919'-8901' . 40 P�11W 3 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11180' 11300' 8893'-8875' } r 2000' Freeze Protect w/140 Bbls Diesel 11590'-11680' 8879'-8903' ',;,1 w,2: 11847' Weatherford CIBP ..r,,II 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.). June 25,2012 Gas Lift Date of Test. Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL. CHOKE SIZE' GAS-OIL RATIO. 6/22/2012 8 Test Period 4 615 • 1259 1080 128 2046 Flow Tubing Casing Press. Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 500 1600 24-Hour Rate 4 1846 • 3777 3239 27.6 28. CORE DATA Conventional Core(s)Acquired'? 0 Yes ®No • Sidewall Core(s)Acquired? 0 Yes ®No • If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None VL'i74,- I I'V '0,' RBDMS JUL 0 3 1011 e5Wiek ei , r ,-. Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only 29. GEOLOGIC MARKERS(List all formations an'' erkers encountered). 30. FORMATION TESTS NAME J TVD Well Tested. J Yes ®No ' Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25 071 HRZ 6927' 6311' None Kalubik 7143' 6512' Kuparuk C 7203' 6570' LCU/Kuparuk B 7243' 6609' Kuparuk A 7272' 6637' Miluveach 7344' 6708' Kingak 8029' 7390' Sag River 9311' 8660' Shublik 9341' 8690' Eileen 9459' 8801' Ivishak Zone 4 9501' 8838' Ivishak Zone 3 9852' 9033' Ivishak Zone 3 10270' 9032' Ivishak Zone 3 11885' 8997' Formation at Total Depth(Name): Ivishak Zone 3 11885' 8997' 31.List of Attachments: Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Joe Lastufka Title:, Drilling Technologist Date. l• � I PBU Z-06A 212-043 Prepared By Name/Number Joe Lastufka, 564-4091 Well Number Permit No./Approval No. Drilling Engineer Ryan C,olkosz, 564-5977 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8 The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only TREE= 4-1/8'CIW '?-06A S WELLHEAD= MCEVOY PJM ©RA r-T 1/2" CHROM NOTES TBG & LWELL R LE TO @ 11675'*"'4- ACTUATOR= BAKER C KB. ELEV= 91.97' I I BE. ELEV= 55.12' KOP= 3100' —.4-1/2"HES X NIP,ID-=3.813" Max Max Angle= 101'@ 10535' 2D"CONDUCTOR ? ' 2209' Datum MD= 9564' Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH I PORT DATE 7 2984 2984 6 CA DOME BK it 16 06/16/12 13-3/8"CSG,68#, L-80, ID=12.415" —{ 2661' 6 5338 5009 36 CA SO BK 20 06/16/12 5 6781 6188 35 CA DMY BK 0 06/04/12 4 7521 6883 4 CA DMY 8K 0 06/04/12 TOP OF 7"LNR —i 6581' 3 8053 7413 8 CA DMY BK 0 06/04/12 2 8544 7899 8 CA DMY BK 0 06/04/12 1 8910 8262 7 CA DMY BK s 0 06/04/12 9-5/8"05G,47#,L-80,ID=8.681" —H —6728 \ 6581' —9.5/8"X 7' BKR HRD-E ZXPN LTP I9-5/8"WHIPSTOCK(05/06/12) 1-1 6728' w!11'TBR ID=6 180 E 6567' —9-5/8"X 7" BKR FLEX-LOCK HGR,ID=6.210" Minimum ID = 3.725" @ 9125' 4-112" HES XN NIPPLE ,v ,til MILLOUTWINDOW(Z-06A) 6728'-6762' \'' ' 8985' —14.1/2"HES X NIP, ID 3.813" I E �� 9014' --17"X 4-1/2'HES TNT PKR, ID= 3.856" 1 ' 9049' —4-1/2"HES X NIP, ID=3.813" I 9125' -4-1/2"HES XN NIP. ID-=3.725" TOP OF 4-1/2" LNR [ 9127 � 9127' —7"X 5" BKR HRD-E ZXP PKR _..._..---._......_..--------..__.._.._...z .._._ 1( w/11'TIEBACK,ID=4.320" I 4-1/2"TBG. 12.6#, 13CR-80 VAM TOP, — 9136' 0152 bpf,ID=3.958" 1\ 9137' —14.112"WLEG, ID=4.000" \ 9149' 7"X5" BKR FLEX LOCK HGR„ ID=4,320" 9159' Ha" X4.1/2"XO BUSHING, 1D= 3.88" 7" LNR,26#, L-80 VAM TOP HC, 9310' \ , , .0383 bpf, ID=6.276" PERFORATION SUMMARY REF LOG:SWS-BHCS ON 05/23/88 ANGLE AT TOP PERF: °@ ' Note: Refer to Production DB for historical peri data I { SIZE SPF INTERVAL Opn/Sqz I SHOT SQZ 2-7/8" 6 9556-9692 0 106/02/12 ' 2-7/8" 6 10835-10930 0 06/02/12 2-7/8" 6 11040-11140 0 06/02/12 ' 2-7/8" 6 11180-11300 0 06/02/12 2-7/8" 6 11590-11680 0 06/02/12 ' I PBTD H 11847' 11848' -4-1/2"WFDCIBP(06/18/12) � 1 4-1/2"LNR, 12 6#, 13CR VAM TOP. —1 11953' .0152 bpf,ID=3.958" MO. 444441 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06(02/88 AUDI#2 INITIAL COMPLETION WELL: Z-06A 06/05/12 0-14 SIDETRACK(Z-06A) PERMIT No:'21201430 06/14/12 PJC DRLG HO CORRECTIONS API No: 50-029-21798-01 06/15/12' PJC DRLG DRAFT CORRECTIONS - SEC 19,T11 N, R12E,.974'FNL&1323'FWL 06/17/12 TJH/PJC GLV C/O(06/16/12) 06/19/12 RMH/JMD SET WFD CIBP(06/18/12) BP Exploration(Alaska). BP AMERICA LOT/ FIT Summary Well Name: Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/09/12 LOT 6,756.00 6,168.16 10.30 1,700.00 5,000.40 15.61 05/15/12 FIT 9,332.00 8,680.91 8.50 1,275.00 5,108.10 11.33 05/15/12 FIT 9,332.00 8,661.00 8.50 1,275.00 5,099.30 11.33 Page 1 of 1 North America -ALASKA- BP Page 1 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (0) _ 4/28/2012 02:00 - 03:00 1.00 MOB P PRE .RIG DOWN FOR MOVING OFF WELL Z-50 -CLEAN CLEAR CELLAR AREA OF TOOLS AND EQUIPMENT 03:00 - 04:30 1.50 MOB P PRE REVIEW SOP AND HOLD PJSM FOR SKIDDING RIG FLOOR. -SKID RIG FLOOR INTO POSITION FOR RIG MOVE OPERATIONS. 04:30 - 05:00 0.50 MOB P PRE REVIEW SOP AND HOLD PJSM FOR RIG MOVE AND SPOTTING OVER WELL Z-06. 05:00 - 09:00 4.00 MOB P PRE RIG MOVE OPERATIONS. WSL VERIFY ALL VALVES IN CLOSED POSITION,ZERO PRESSURE ON OA/T/IA -PULL RIG OFF WELL Z-50. ▪MOVE RIG TOWARDS WEST END OF Z-PAD, 'WELL Z-06.MAT LOCATION AS NECESSARY. 09:00 - 11:30 2.50 MOB P PRE POSITION RIG AND SPOT MATS AROUND WELL 11:30 - 15:00 3.50 MOB P PRE VERIFY WELL HAS ZERO PRESSURE ON OA, IA AND TUBING. PULL RIG ONTO WELL AND LEVEL. 1**BARRIERS FOR MIRU** .PASSING MIT-IA TO 4,000-PSI PASSING MIT-OA TO 2,000-PSI TWC TESTED TO 3,500-PSI TESTED CEMENT PLUG ACROSS PERFS ANNULAR PACKER _ 15:00 - 16:00 1.00 MOB P PRE SKID RIG FLOOR INTO DRILLING POSITION. -SPOT OPEN TOP TANK FOR CIRCULATING OUT FREEZE PROTECT AND RIG UP HARDLINE TO CELLAR. -PRESSURE TEST HARDLINE TO 4,000-PSI. 16:00 - 20:30 4.50 MOB P PRE INSTALL#2 CONVEYOR, HOOK UP SERVICES LINES, MUD LINE, CHOKE LINE,MUD BUCKET LINE AND BLEEDER TO RIG FLOOR. -SPOT ROCK WASHER AND BERM SAME. -SPOT RIG FUEL TANK -SPOT MUD MAN,GEOLOGIST,MWD AND ,MEETING SHACKS. 20:30 - 23:30 3.00 MOB P PRE TAKE ON 8.5-PPG 125-DEG SEAWATER.SPOT CIRC TANK/HARDLINE -FIRE DRILL CRT=120-SEC -HOLD H2S AND RIG EVACUATION TABLE TOP DRILL. -SPOT LRHO AND RIG UP HARDLINE. *RIG ACCEPTED AT 20:30-HRS,04/28/2012* 23:30 - 00:00 0.50 MOB P PRE ,RIG UP CELLAR.VERIFY OA AND IA VALVES 4/29/2012 00:00 - 03:30 3.50 RIGU P DECOMP ARE FY O TIGHT. 1T - 'VERIFY OA AND IA VALVES ARE LEAK TIGHT. OA VALVE LEAKING.DSM SERVICE OA VALVE. INSTALL DOUBLE VALVES ON OA. -CONTINUE WORK ON CONVEYOR#2 03:30 - 07:00 3.50 RIGU P t DECOMP INSTALL DOUBLE VALVE ON IA,RIG UP LRHO ON OA VALVE. PRESSURE TEST LRHO LINES.PRESSURE TEST OA TO 250 PSI LOW FOR 5 MIN AND 2000 PSI HIGH FOR 30 MIN.GOOD TEST. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 2 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release: 6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth' Phase Description of Operations (hr) (ft) 07:00 - 10:00 3.00 RIGU P DECOMP RIG UP LRHO TO THE IA VALVE AND PRESSURE TEST LINES.PRESSURE TEST IA X T TO 250 PSI LOW FOR 5 MIN AND 4000 PSI HIGH FOR 30 MIN.GOOD TEST. BLEED DOWN TUBING AND IA AND RIG DOWN LRHO. 10:00 - 11:00 1.00 RIGU P DECOMP RIG UP AND TEST TWC FROM ABOVE TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH. GOOD TEST. 11:00 - 13:30 2.50 RIGU P DECOMP PJSM.NIPPLE DOWN TREE AND ADAPTER FLANGE AND WRAP IN ENVIRO WRAP. SECURE TREE IN THE CELLAR.LOAD DRILL PIPE IN THE PIPE SHED AND STRAP. 13:30 - 22:00 8.50 RIGU P DECOMP PJSM. HELD SPILL DRILL. CAMERON CHECK LDS ON THE TUBING SPOOL, INSTALL 2' SPACER SPOOL. -TAKE RKB MEASURMENTS AND CHECK FOR CLEARANCE OF BOTTOM RAMS FOR BOP TEST. *BOB NOBLE AOGCC WAIVED WITNESS OF BOPE TEST AT 23:40-HRS,04/29/2012`. 22:00 - 00:00 2.00 RIGU P DECOMP 1 WHILE PREFORMING VISUAL DERRICK INSPECTION TAKE DRILLING RISER TO SHOP ON MOBILE PAD. HAVE WELDER ADD ADDITIONAL LENGTH TO RISER FOR BOP SPACEOUT. INSTALL RISER 4/30/2012 00:00 - 01:00 1.00 BOPSUR P PRE CONTINUE TO INSTALL BOPE RISER AND FLOW LINE. -RIG UP BOP TEST EQUIPMENT. 01:00 - 01:30 0.50 BOPSUR P PRE WELL CONTROL DRILL. -FILL GAS BUSTER,6-BBL TOTAL. 01:30 - 07:00 5.50 BOPSUR P PRE PRESSURE TEST BOP WITH 4"AND 3.5"TEST JOINTS.TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH,AND TEST RAMS TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH. 07:00 - 08:30 1.50 BOPSUR P PRE RIG DOWN TEST EQUIPMENT AND BLOW DOWN CHOKE AND KILL LINES. 08:30 - 11:00 2.50 BOPSUR P PRE INSTALL DUTCH SYSTEM AND PICK UP AND TEST LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH.PULL TWC AND LAY DOWN LUBRICATOR. 11:00 - 13:00 2.00 PULL P DECOMP MAKE UP CROSS OVERS TO THE LANDING JOINT AND SCREW INTO TUBING HANGER. LINE UP IA TO TIGER TANK. 13:00 - 19:30 6.50 PULL P DECOMP PJSM.TEST LINES TO 250 PSI LOW AND 3500 PSI HIGH AND CONFIRM NO LEAKS. REVERSE CIRCULATE 55 BBLS AT 3 BPM 2900 PSI.SHUT DOWN AND BLEED PRESSURE. LINE UP AND PUMP ECF-1840 SURFACE TO SURFACE.STAGE PUMPS UP KEEPING PRESSURE AT 3400 PSI FROM 2 BPM TO 5.5 BPM. SHUT DOWN PUMPS AND FLOW CHECK WELL FOR 10 MINS AND CONFIRM NO FLOW.WRAP TUBING HEAD WITH HERCULITE AND STEAM TO LOOSEN UP TUBING HANGER. Printed 6/18/2012 11.26:46AM North America -ALASKA- BP Page 3 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PBZ Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft)- . 19:30 - 20:30 1.00 PULL P DECOMP PJSM.BACK OUT TUBING HANGER LOCK DOWN SCREWS.PICK UP ON TUBING AND TUBING HANGER BROKE FREE WITH 120K UP.CONTINUE PICKING UP AND TUBING BROKE OVER AT 130K. 20:30 - 22:30 2.00 PULL P DECOMP PJSM.CIRCULATE BOTTOMS UP STAGING PUMPS UP AS FOLLOWS.8 BPM 1530 PSI,9 BPM 1870 PSI,10 BPM 2300 PSI.TAKE FIRST 10 BBLS TO THE ROCK WASHER TO PREVENT DIESEL FROM ENTERING THE PITS. 22:30 - 23:00 , 0.50 PULL P DECOMP PULL HANGER TO THE FLOOR AND DISCONNECT CONTROL LINES, BREAK OUT AND BLOW DOWN TOP DRIVE. .23:00 - 00:00 1.00 PULL P DECOMP BREAK OFF TUBING HANGER,REMOVE CROSS OVERS,AND LAY DOWN LANDING JOINT AND 1 JOINT OF 3.5"TUBING. -D1-DRILL CREW RESPONDED.HOLD AAR. 5/1/2012 00:00 - 10:00 10.00 PULL P DECOMP PULL OUT OF HOLE LAYING DOWN 3.5" TUBING. -288 TOTAL JOINTS,7 GLM,1 SSSV,1 BVN -33 CENTRILIZERS,33 KEEPER PINS,4 SS BANDS 10:00 - 11:30 1.50 PULL P DECOMP CLEAN AND CLEAR FLOOR OF TUBING EQUIPMENT 11:30 - 13:30 2.00 CLEAN P DECOMP MOBILIZE CLEAN OUT BHA COMPONENTS TO RIG FLOOR AND PIPE SHED 13:30 - 16:30 3.00 CLEAN P DECOMP MAKE UP CLEAN OUT BHA AND RUN IN HOLE TO 243' 16:30 - 00:00 7.50 CLEAN P DECOMP PICKUP NEW 4"DRILL PIPE FROM 243'TO 3852' -MAKE UP EACH JOINT AND TORQUE TO SPECS,BREAK OUT REDOPE AND RETORQUE 5/2/2012 00:00 - 09:00 9.00 CLEAN P DECOMP CONTINUE TO PICK UP NEW 4"DRILL PIPE FROM 3852' -MAKE UP EACH JOINT AND TORQUE TO SPECS,BREAK OUT REDOPE AND RETORQUE 09:00 - 09:30 0.50 CLEAN P DECOMP WORK CASING SCRAPER FROM 8700'TO 8800' -PUW 182K,SOW 172K,ROT 180K -340 GPM,840 PSI 09:30 - 10:30 1.00 CLEAN P DECOMP 'CONTINUE TO RUN IN HOLE FROM 8852'TO 9234' 10:30 - 11:00 0.50 CLEAN P DECOMP WORK CASING SCRAPER FROM 9100'TO 9200'AND 9200'TO 9300' -PUW 182K,SOW 172K,ROT 180K -340 GPM,840 PSI 11:00 - 11:30 0.50 CLEAN P DECOMP CONTINUE TO RUN IN HOLE FROM 9300'TO 9322' -TAG UP ON TUBING AT 9322' 11:30 - 12:00 0.50 CLEAN P ' DECOMP PUMP HIGH VIS SWEEP 600 GPM, 1340 PSI 12:00 - 13:00 1.00 CLEAN P DECOMP DISPLACE WELL TO 10.3 PPG POWER PRO MUD -610 GPM,1740 PSI 13:00 - 18:00 5.00 CLEAN P DECOMP MONITOR WELL 10 MINUTES, POOH FROM 9322'TO 234' Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 4 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 19:00 1.00 CLEAN P DECOMP MONITOR WELL 10 MINUTES, LAY DOWN SCRAPER BHA 19:00 - 19:30 0.50 EVAL P DECOMP CLEAR FLOOR,MOBILIZE E-LINE EQUIPMENT TO FLOOR 19:30 - 23:00 3.50 EVAL P DECOMP PJSM WITH ALL HANDS,RIG UP TO RUN E-LINE 23:00 - 00:00 1.00 EVAL P DECOMP RUN IN HOLE WITH USIT AND SONIC SCANNER ON E-LINE 5/3/2012 00:00 - 04:30 4.50 EVAL P DECOMP CONTINUE TO RUN IN HOLE WITH USIT ON E-LINE TO 9280' PULL OUT OF HOLE WITH USIT LOGGING ON WAY OUT HYDRAULIC ISOLATION FIELD PICKS,7500' TO 9300',6900'TO 7200',4120 TO 4150 104:30 - 05:30 1.00 EVAL P DECOMP LAY DOWN LOGGING TOOLS 05:30 - 08:30 3.00 EVAL ' P DECOMP RIG UP TO RUN EZSV ON E-LINE,WHILE CONSULTING WITH TOWN ON LOGS 08:30 - 11:00 2.50 EVAL P DECOMP RUN IN HOLE WITH EZSV ON E-LINE -EZSV SET AT 7695'CENTER OF ELEMENT -TOP OF EZSV AT 7694' 11:00 - 13:30 2.50 EVAL i P DECOMP PULL OUT OF HOLE WITH E-LINE 13:30 - 15:30 2.00 EVAL P DECOMP RIG UP AND PRESSURE TEST EZSV -250 PSI LOW FOR 5 MINUTES L -4000 PSI HIGH FOR 30 MINUTES 15:30 - 17:30 2.00 EVAL P DECOMP RIG DOWN E-LINE EQUIPMENT 17:30 - 19:00 1.50 EVAL P DECOMP PJSM WITH ALL PERSONNEL,RIG UP TO RUN 3.5"NSCT CEMENT STINGER 19:00 - 21:00 2.00 EVAL P DECOMP PICK UP 52 JOINTS OF 3.5"NSCT TUBING AND RUN IN HOLE TO 1634' 21:00 - 00:00 3.00 EVAL P DECOMP CONTINUE TO RUN IN HOLE PICKING UP NEW DRILL PIPE FROM 1634'TO 3727' -MAKE UP EACH JOINT AND TORQUE TO SPECS,BREAK OUT REDOPE AND RETORQUE 5/4/2012 00:00 - 01:30 1.50 EVAL P , DECOMP j CONTINUE TO RUN IN HOLE PICKING UP NEW DRILL PIPE FROM 3727'TO 4297' -MAKE UP EACH JOINT AND TORQUE TO SPECS,BREAK OUT REDOPE AND RETORQUE 01:30 - 03:00 1.50 EVAL P DECOMP RUN IN HOLE FROM DERRICK FROM 4297'TO • 7701' -TAG UP ON EZSV AT 7701'DRILL PIPE MEASUREMENT -SET DOWN 15K TO CONFIRM 03:00 - 04:30 1.50 EVAL P DECOMP MAKE UP 95/8"STORM PACKER AND SET 36' BELOW ROTARY 04:30 - 05:30 1.00 WHSUR P i DECOMP MAKE UP PACK OFF RUNNING TOOL, ENGAGE PACK OFF 05:30 - 06:00 0.50 WHSUR P DECOMP BOLDS,CASING ATTEMPTED TO GROW 1-SET DOWN HALF TOP DRIVE WEIGHT AND ATTEMPT TO BACK OUT LOCKDOWNS 06:00 - 08:00 2.00 WHSUR P DECOMP PICK UP JOINT OF 5"HWDP AND SET DOWN HALF TOP DRIVE WEIGHT ON PACK OFF -BOLDS,CASING ATTEMPTED TO GROW, RILDS,DECISION MADE NOT TO REPLACE -TEST PACK OFF 250 PSI LOW 15 MINUTES -4000 PSI HIGH FOR 30 MINUTES Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 5 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 08:30 0.50 WHSUR P DECOMP PICK UP STORM PACKER RUNNING TOOL, RETRIEVE STORM PACKER,AND LAY DOWN 08:30 - 10:00 1.50 WHSUR P DECOMP RUN IN HOLE FROM 7526'TO 7694' 10:00 - 13:30 3.50 PXA P DECOMP CIRCULATE SURFACE TO SURFACE 400 GPM, 940 PSI 13:30 - 14:30 1.00 PXA P DECOMP PRESSURE TEST CEMENT LINES -250 PSI LOW,4000 PSI HIGH 5 MINUTES EACH 14:30 - 16:00 1.50 PXA P DECOMP PUMP BALANCE PLUG AS FOLLOWS -PUMP 30 BBLS OF 13 PPG MUD PUSH 4.5 BPM,300 PSI -PUMP 73.2 BBLS OF 15.8 PPG CLASS G CEMENT 6 BPM 160 PSI 358 SACKS,YIELD 1.16 CUFT/SK -PUMP 4.3 BBLS OF 13 PPG MUD PUSH 3 BPM,30 PSI -DISPLACE WITH RIG 57.3 BBLS OF 10.3 PPG POWER PRO MUD -BOTTOM OF PLUG @ 7700'TOP AT 6700' -CIP AT 15:39 16:00 - 17:00 1.00 PXA -P ! DECOMP PULL OUT OF HOLE 11 STANDS TO 6640' 17:00 - 19:00 2.00 PXA P DECOMP CIRCULATE BOTTOMS UP AT 520 GPM,1110 PSI 19:00 - 23:30 4.50 PXA P DECOMP j MONITOR WELL FOR TEN MINUTES,WELL !STATIC PULL OUT OF HOLE FROM 6640'TO 1634' RIG UP TUBING EQUIPMENT,LAY DOWN 1634'OF 3.5"CEMENT STINGER 23:30 - 00:00 0.50 PXA P DECOMP RIG DOWN TUBING EQUIPMENT 5/5/2012 00:00 - 01:00 1.00 PXA P DECOMP CONTINUE TO RIG DOWN TUBING EQUIPMENT 01:00 - 01:30 0.50 PXA P j DECOMP RIG UP AND FLUSH STACK WITH STACK WASHER -FUNCTION ALL BOPE,RAMS AND ANNULAR 01:30 - 02:00 0.50 PXA P DECOMP LAY DOWN STACK WASHER,BLOW DOWN CHOKE AND KILL LINES 02:00 - 04:00 ! 2.00 PXA P DECOMP MAKE UP 8.5"ROLLER CONE BIT AND CLEAN OUT ASSEMBLY RUN IN HOLE TO 217' 04:00 - 07:30 3.50 PXA P . DECOMP RUN IN WITH CLEAN OUT ASSEMBLY FROM 217'TO 6300' 07:30 - 09:30 2.00 PXA P DECOMP PJSM WITH ALL HANDS,SLIP AND CUT DRILLING LINE,SERVICE RIG 09:30 - 10:00 0.50 PXA P DECOMP CONTINUE TO RUN IN HOLE FROM 6300'TO 6675' 10:00 - 10:30 0.50 PXA P DECOMP WASH DOWN AT 2 BPM,250 PSI,TAG CEMENT AT 6692'SET DOWN 15K -DRESS CEMENT FROM 6692'TO 6755' -GPM 420, PSI 840, RPM 60,WOB 20K -PUW 153K,SOW 143K,RTW 150K,TQ 3K _ 10:30 - 12:00 1.50 PXA P DECOMP CIRCULATE BOTTOMS UP AT 420 GPM,840 PSI 12:00 15:00 3.00 PXA P DECOMP MONITOR WELL FOR 10 MIN -PULL OUT OF HOLE FROM 6755'TO 217' 15:00 - 16:30 1.50 PXA P DECOMP RACK BACK COLLARS AND LAY DOWN CLEAN OUT BHA 16:30 - 17:00 0.50 WHIP P DECOMP MOBILIZE SCRAPER RUN BHA OFF RIG FLOOR,MOBILIZE WHIP STOCK BHA AND TOOLS TO RIG FLOOR. Printed 6/18/2012 11:26:46AM North America-ALASKA- BP Page 6 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C:(6,346,237.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 20:30 3.50 WHIP P DECOMP MAKE UP WHIP STOCK,TAIL PIPE ASSEMBLY AND BHA AS PER THE BAKER REP -RUN IN HOLE TO 1106' 20:30 - 23:30 3.00 WHIP N DFAL 1,106.00 DECOMP SHALLOW HOLE TEST MWD -MWD WOULD NOT TURN ON,TRIED SEVERAL DIFFERENT PROCEDURES AS PER SCHLUMBERGER TO GET TOOL TO WORK, NONE WERE SUCCESSFUL 23:30 - 00:00 0.50 WHIP N DFAL 1,106.00 DECOMP PJSM WITH ALL HANDS,BLOW DOWN TOP DRIVE,MONITOR WELL FOR 10 MINUTES PULL OUT OF HOLE TO CHANGE OUT MWD 5/6/2012 00:00 - 02:00 2.00 WHIP N DFAL 1,106.00 DECOMP PULL OUT OF HOLE RACK BACK HEAVY WEIGHT AND DRILL COLLARS LAY DOWN MWD 02:00 - 02:30 0.50 WHIP N DFAL 1,106.00 DECOMP PICKUP NEW MWD AND SCRIBE TOOLFACE OFFSET 02:30 - 03:30 1.00 WHIP N DFAL 1,106.00 DECOMP RUN IN HOLE WITH WHIPSTOCK TO 1106' 03:30 - 04:00 0.50 WHIP N DFAL 1,106.00 DECOMP SHALLOW HOLE TEST MWD 500 GPM,870 PSI TEST GOOD 04:00 - 10:00 6.00 WHIP P DECOMP CONTINUE TO RIH FROM 1054'FILLING EVERY 2000' 10:00 - 10:30 0.50 WHIP P DECOMP MAKE UP TOP DRIVE AT 6600'AND WASH DOWN TO 6755' ORIENTATE 38 DEGREES LEFT OF HIGH SIDE 10:30 - 11:00 0.50 WHIP P DECOMP SET LOWER ANCHOR AT 6755'SHEARED AT 18K -PULL 10K OVER STRING WEIGHT TO CONFIRM ANCHOR SET -SHEAR OFF WHIP STOCK WITH 35K DOWN WEIGHT -SOW 150K,PUW 164K 11:00 - 12:00 1.00 STWHIP P DECOMP SPR'S TAKEN AT 6728',6122 TVD -PUMP 1 AT 20 SPM 250,30 SPM 270 -PUMP 2 AT 20 SPM 230,30 SPM 280.MUD WEIGHT 10.3 PPG. /, MILL WINDOW TOP FROM 6728'TO 6730' K -PUW 164K,SOW 150K,RTW 159K -RPM 40/80,500 GPM,1677 PSI 12:00 - 16:30 4.50 STWHIP P DECOMP CONTINUE MILLING WINDOW FROM 6730'TO 6756'. -PUW 164K,SOW 150K,RTW 159K -TQ ON 8K,TQ OFF 3K,500 GPM, 1680 PSI ON,1620 PSI OFF -WEIGHT ON BIT 7K 16:30 - 17:30 1.00 STWHIP P DECOMP PUMP AND CIRCULATE SWEEP AROUND,500 GPM,1950 PSI 0`J- -RPM 80,TQ 3K,PUW 160K,SOW 150K,RTW 159K 17:30 - 18:30 1.00 DRILL P INTI RIG UP AND PERFORM LOT TO 15.6 EMW 1700 PSI VOLUME PUMPED 2.5 BBLS,VOLUME BACK 2 BBLS -LOT APPROVED BY ODE RYAN CIOLKOSZ -RIG DOWN TEST EQUIPMENT Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 7 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code ! NPT NPT Depth Phase Description of Operations (ft) 18:30 - 20:30 2.00 DRILL P INTI DRILL AHEAD FROM 6756'TO 6764'TO GET UPPER MILL 3'OUT OF WINDOW -PUW 164K,SOW 150K,RTW 159K, RPM 80, TO ON 8K,TQ OFF 3K -500 GPM PSI ON 1670, OFF 1620,WEIGHT ON BIT 10K -335 LBS OF METAL RECOVERED 20:30 - 22:30 2.00 DRILL P INTI DISPLACE WELL FROM 10.3 POWER PRO TO 10.3 LSND MUD,500 GPM 1950 PSI -20 RPM,TQ 3K SPR'S TAKEN AT 6728',6122 TVD -PUMP 1 AT 20 SPM 200, 30 SPM 280 -PUMP 2 AT 20 SPM 200, 30 SPM 260.MUD WEIGHT 10.3 PPG. 22:30 - 00:00 1.50 DRILL P i INTI FLOW CHECK AND PULL OUT OF HOLE FROM 6764'TO 5800', 5/7/2012 00:00 - 02:30 2.50 DRILL P INTI CONTINUE TO PULL OUT OF HOLE FROM- 5800'TO 995' 02:30 - 05:00 2.50 DRILL P INTI MONITOR WELL 10 MINUTES, LAY DOWN 995' OF MILLING BHA -UPPER MILLS WERE IN GAUGE 05:00 - 06:30 1.50 DRILL , P INTI PICK UP MWD TOOLS FOR NEXT RUN 06:30 - 09:00 ' 2.50 DRILL P INTI PJSM-WITH DIRECTIONAL DRILLER ON MAKING UP BHA AND INSTALLING SOURCES -MAKE UP BIT,ARC, MWD,ADN, DC'S WELL COMMANDER,JARS,5"HWDP. 09:00 - 09:30 0.50 DRILL P INTI RUN IN HOLE WITH 4"HWDP FROM 632'TO 939' -PULSE TEST MWD -BLOW DOWN TOP DRIVE 09:30 - 13:00 3.50 DRILL P INTI CONTINUE TO RIH FROM 939'FILLING EVERY 2000'TO 6543' 13:00 - 14:00 1.00 DRILL N RREP 6,543.00 INTI LUBRICATE RIG,CHANGE OUT SWIVEL PACKING ON TOP DRIVE 14:00 - 15:30 1.50 DRILL N INTI CONTINUE RIH FROM 6543'TO 6764' -MAD PASS AT 300 FT/HR IN RECORDED MODE -OBTAIN ECD BASELINE WHILE SLOWLY PULLING UP 15:30 - 00:00 8.50 DRILL N INTI DRILL FROM 6764'TO 7152' -PUW 170K,SOW 150K,ROT 160K -GPM 550,PSI ON 2810,PSI OFF 2550, RPM 60 -TQ ON 6K,TQ OFF 4K,WOB 15K,ECD 11.08 -ART 1.15,AST 4.65,ADT 5.80 SPR'S TAKEN AT 6764',6146 TVD -PUMP 1 AT 20 SPM 200,30 SPM 280 -PUMP 2 AT 20 SPM 200,30 SPM 260.MUD WEIGHT 10.3 PPG. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 8 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/8/2012 00:00 - 12:00 12.00 DRILL P INTI DRILL FROM 7152'TO 7777' -PUW 186K,SOW 164K,ROT 175K -GPM 550, PSI ON 3340,PSI OFF 3180, RPM 80 -TQ ON 6.5K,TQ OFF 3.5K,WOB 12K,ECD 10.94 -ART 2.20,AST 4.88,ADT 7.08 SPR'S TAKEN AT 8059',7520'ND -PUMP 1 AT 20 SPM 400,30 SPM 490 -PUMP 2 AT 20 SPM 400,30 SPM 490.MUD WEIGHT 10.3 PPG. 12:00 - 00:00 12.00 DRILL P INTI DRILL FROM 7777'TO 8917' -PUW 208K,SOW 170K, ROT 184K -GPM 550, PSI ON 3900, PSI OFF 3650,RPM 80 -TQ ON 8K,TQ OFF 7K,WOB 24K, ECD 11.70 -ART 2.20,AST 4.88,ADT 7.08 'SPR'S TAKEN AT 8059',7520'ND -PUMP 1 AT 20 SPM 460,30 SPM 560 W-PUMPEIGHT 2 A110.T 3 20PPG.SP460,30 SPM 560.MUD M SPR'S TAKEN AT 8543',7943'ND -PUMP 1 AT 20 SPM 460,30 SPM 560 -PUMP 2 AT 20 SPM 460,30 SPM 560.MUD WEIGHT 10.3 PPG. 5/9/2012 00:00 - 06:00 6.00 DRILL P INTI DRILL FROM 8917'TO 9312' -PLAY IO SZ W 174K,ROT 184K -GPM 530, PSI ON 3780, PSI OFF 3580, RPM 80 -TQ ON 10K,TQ OFF 8K,WOB 15K, ECD 11.18 -CONTROL DRILL TO PICK SAG -AST 1.27,ART 2.30,ADT 3.57 06:00 08:30 2.50 DRILL P INTI 'CIRCULATE 3 BOTTOMS UP -GPM 540, PSI 3800, RPM 80 -TQ ON 8-10K WORKING PIPE 60 FT -FLOW CHECK WELL FOR 10 MINUTES- WELL STATIC- 08:30 - 12:00 3.50 DRILL P INTI PULL OUT OF HOLE FROM 9312'TO 7461' -PUW 240,SOW 180 -1 BPM,340 PSI SPR'S TAKEN AT 9312',7713'ND -PUMP 1 AT 20 SPM 400,30 SPM 510 -PUMP 2 AT 20 SPM 410,30 SPM 500.MUD WEIGHT 10.3 PPG. 12:00 - 14:30 2.50 DRILL P INTI MAD PASS FROM 7456'TO 7266' -60 RPM,TQ 7K,GPM 450, PSI 270 -CONTINUE PUMPING OUT OF HOLE TO 6638' 14:30 - 16:00 1.50 DRILL P INTI SLIP AND CUT DRILLING LINE 16:00 - 18:30 2.50 DRILL P INTI RUN IN HOLE FROM 6638'TO 9312' -TIGHT SPOT AT 8029'AND 8110' -WORKED THROUGH TIGHT SPOTS ROTATING 20 RPM AND 5 BPM AT 1130 PSI 18:30 - 23:00 4.50 DRILL P INTI CIRCULATE BOTTOMS UP,LARGE SPLINTERED RUNNING SHALE OBSERVED -DECISION WAS MADE TO WEIGHT UP FROM 10.3 PPG TO 10.6 PPG. -GPM 550, PSI 3830, RPM 80,TQ 8,PUW243, SOW 166,RTW 192 Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 9 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task ! Code NPT NPT Depth Phase Description of Operations 23:00 - 00:00 1.00 DRILL P O INTI -PUMP OUT OF HOLE FROM 9312'TO 8126' -1 BPM,410 PSI -PUW 240,SOW 180 SPR'S TAKEN AT 9312',8661'TVD -PUMP 1 AT 20 SPM 390,30 SPM 500 -PUMP 2 AT 20 SPM 390,30 SPM 500.MUD WEIGHT 10.6 PPG. 5/10/2012 00:00 - 03:30 3.50 DRILL P INTI PULL OUT OF HOLE FROM 8126'T06728' -PUW 240,SOW 180 -1 BPM,340 PSI 03:30 - 05:30 2.00 DRILL P INTI RUN IN HOLE FROM 6728'TO 9312' .-PUW 230,SOW 180 05:30 - 09:30 4.00 DRILL P INTI WASH DOWN FROM 9202'TO 9312' -NO OBSTRUCTIONS OR FILL -STAGE PUMPS UP TO 550 GPM,3930 PSI -POW 242,SOW 170,RTW 195,RPM 80,TQ 9K 09:30 - 12:00 2.50 DRILL P INTI 10 MINUTE FLOW CHECK-WELL STATIC -POOH WITH 2 BPM,430 PSI, FROM 9312'TO 8100' SPR'S TAKEN AT 9312',8661'TVD -PUMP 1 AT 20 SPM 380,30 SPM 480 -PUMP 2 AT 20 SPM 370,30 SPM 480.MUD WEIGHT 10.6 PPG. 12:00 - 14:00 2.00 DRILL P INTI PUMP OUT OF HOLE AT 2 BPM,430 PSI, FROM 8100'TO 6728' 14:00 - 15:00 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -GPM 550, PSI 2880, RPM 20 -TQ 3,PUW 180,SOW 145,RTW 165 15:00 - 16:00 1.00 DRILL P INTI RUN IN HOLE FROM 6728'TO 9312' 16:00 - 20:00 4.00 DRILL P INTI CIRCULATE BOTTOMS UP -GPM 550, PSI 3900, RPM 80,TQ 9K -AT BOTTOMS UP THE CUTTING SIZE WAS LARGE AND SPLINTERED -WEIGHTED UP TO 10.8 PPG 20:00 - 23:30 3.50 DRILL P INTI FLOW CHECK WELL 10 MINUTES -PUMP OUT OF HOLE AT 2 BPM,430 PSI, FROM 9312'TO 7773' -PUW 240,SOW 172 SPR'S TAKEN AT 9312',8627'TVD -PUMP 1 AT 20 SPM 430,30 SPM 560 -PUMP 2 AT 20 SPM 430,30 SPM 560. MUD WEIGHT 10.8 PPG. 23:30 - 00:00 0.50 DRILL P INTI RUN IN HOLE FROM 7773'TO 8100' 5/11/2012 00:00 - 01:00 1.00 DRILL P INTI CONTINUE TO RUN IN HOLE FROM 8100'TO 9202'. WASH DOWN TO 9312'. -NO FILL. -PUW 240K,SOW 172K. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 10 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 03:00 2.00 DRILL P INTI CIRCULATE 2 BOTTOMS UP. • -GPM 550, PSI 3900, RPM 60,TQ 9K. -ECD'S= 11.44. PUW=242K,SOW= 170K, ROT=200K. -NO CHANGE IN CUTTINGS SINCE LAST TIME ON BOTTOM. '-CONSULT WITH TOWN SPR'S TAKEN AT 9312',8664'TVD MUD WEIGHT 10.6 PPG. -PUMP 1 AT 20 SPM 420, 30 SPM 550. -PUMP 2 AT 20 SPM 420,30 SPM 550. 03:00 - 07:30 4.50 DRILL P INTI FLOW CHECK WELL 10 MINUTES. -PUMP OUT OF HOLE AT 2 BPM,430 PSI, FROM 9312'TO 6728'. -PUW 240K,SOW 172K. 07:30 - 12:00 4.50 DRILL P INTI FLOW CHECK WELL 10 MINUTES. BLOW DOWN TOP DRIVE AND PULL OUT OF THE HOLE FROM 6728'TO 939'. 12:00 - 15:00 3.00 DRILL P INTI FLOW CHECK WELL 10 MINUTES. LAY DOWN 4"HWDP, COLLARS,REMOVE NUKES AND MWD TOOLS. 15:00 - 18:30 3.50 DRILL P INTI MAKE UP STACK WASHER AND FLUSH STACK. FUNCTION TEST RAMS. CHANGE OUT 3-1/2"X 6"RAMS TO 7"RAMS. MOBILIZE BHA AND HANDLING TOOLS OFF THE RIG FLOOR. 18:30 - 22:30 4.00 DRILL P INTI TEST 7"RAMS 250 PSI LOW AND 4000 PSI I HIGH FIVE MINUTES EACH. LOW TEST I FAILED DUE TO TEST PLUG NOT SEATING PROPERLY. DECISION TO CHANGE OUT TEST PLUG. RIG UP TO RUN 7"LINER WHILE WAITING FOR NEW TEST PLUG. 22:30 - 23:00 0.50 DRILL P INTI CHANGE OUT TEST PLUG AND TEST 7"RAMS ..TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 I MINUTES. 23:00 - 00:00 1.00 DRILL P INTI LAY DOWN TEST PLUG AND TEST JOINT. RIG DOWN TEST EQUIPMENT. RUN IN THE HOLE WITH WEAR BUSHING AND RUN IN LOCK DOWN SCREWS. CONTINUE TO RIG UP TO RUN 7"LINER. 5/12/2012 00:00 - 01:30 1.50 CASING P INTI RIG UP TO RUN IN THE HOLE WITH 7"LINER. 01:30 - 07:30 6.00 CASING P INTI RUN IN THE HOLE WITH 7",26#,L-80,VAM TOP HC LINER FROM SURFACE TO 2702'. -AVERAGE MAKE UP TORQUE 10,950 FT/LBS 07:30 - 08:30 1.00 CASING P INTI CHANGE OUT ELEVATORS,MAKE UP BAKER FLEX LOCK LINER HANGER AND ZXPN LINER TOP PACKER WITH BAKER HRD-E RUNNING TOOL. 08:30 - 09:30 1.00 CASING P INTI CIRCULATE 1.50 LINER VOLUME=150 BBLS, 5 BPM,202 GPM WITH 280 PSI. BAKER REPRESENTATIVE MIXED PAL-MIX AND POURED INTO HANGER ASSEMBLY. 09:30 - 16:00 6.50 CASING P INTI RUNINTHE HOLE WITH 7"LINER ON 4"DRILL PIPE FROM 2736'TO 6725'. -FILL EVERY 10 STANDS. 16:00 - 17:00 1.00 CASING P INTI CIRCULATE BOTTOMS UP STAGING PUMPS UP TO 6 BPM,670 PSI. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 11 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations I (ft) 17:00 19:00 2.00 t CASING P INTI RUN IN THE HOLE WITH 7"LINER ON 4"DRILL PIPE FROM 6725'TO 7935'. -FILL EVERY 10 STANDS. 19:00 - 20:30 1.50 CASING P INTI CIRCULATE BOTTOMS UP STAGE PUMPS UP T06 BPM,830 PSI. 20:30 - 23:00 2.50 CASING P INTI RUN IN THE HOLE WITH 7"LINER ON4"DRILL PIPE FROM 7935'TO 9312'. -HAD TO WORK THROUGH TIGHT HOLE FROM 9132'TO 9312' 23:00 - 00:00 1.00 CASING P INTI MAKE UP CEMENT HEAD AND CIRCULATE, STAGE UP PUMPS TO 2.5 BPM,470 PSI. -PUW=275K,SOW= 148K. 5/13/2012 00:00 - 02:00 2.00 CASING P INTI CONTINUE TO CIRCULATE,STAGE PUMPS UP TO 4 BPM,750 PSI. 02:00 - 03:00 1.00 CASING P INTI CIRCULATE AT 4 BPM,750 PSI. RECIPROCATE PIPE STRETCH PLUS 2',8' TOTAL 03:00 - 08:30 5.50 CASING P INTI CIRCULATE AT 4 BPM,750 PSI. -LOSING FLUIDS AT 15 BPH. SLOW PUMP DOWN TO 3 BPM,470 PSI. -LOSING FLUIDS AT 7 BPH. 08:30 13:00 4.50 CASING P INTI ISOLATE TO PIT 1 AND LOWER YIELD POINT FOR UPCOMING CEMENT JOB. STAGE • PUMPS UP FROM 30 SPM,121 GPM,470 PSI, TO 50 SPM,202 GPM,830 PSI. STARTED PACKING OFF,SLOW PUMPS DOWN TO 45 SPM,191 GPM,730 PSI. STAGE PUMPS BACK UP TO 55 SPM,216 GPM,990 PSI. CONTINUE TO RECIPROCATE STRING. TOTAL LOSSES FOR TOUR=30 BBLS. 13:00 - 14:00 1.00 CASING P INTI TEST CEMENT LINES TO 250 PSI LOW,4500 PSI HIGH FOR 5 MINUTES EACH. 14:00 - 14:30 0.50 CASING P INTI .CONTINUE TO CIRCULATE 5 BPM,800 PSI. -BATCH UP CEMENT. Printed 6/18/2012 11:26:46AM North America-ALASKA- BP Page 12 of 25 Operation Summary Report Common Wet Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:30 - 16:00 1.50 CEMT P INTI PUMP 40 BBLS 10.9 PPG MUD PUSH II -4.7 BPM,10-12%FLOW,807 PSI. PUMP 82 BBLS 11.0 PPG LITECRETE(249 SACKS,1.85 FT3/SK). -4.7 BPM,10%FLOW,933 PSI. PUMP 19 BBLS 15.8 PPG "G"CEMENT(91 SACKS,1.17 FT3/SK). -4.3 BPM,10%FLOW,575 PSI. DROP WIPER DART AND PUMP 7 BBLS OF WATER. SWITCH TO RIG AND DISPLACE WITH MUD 4.8-5 BPM,11%FLOW,520 PSI. SLOW PUMPS DOWN TO 2.5 BPM, LATCH UP AT 580 STROKES,1180 PSI. CONTINUE TO DISPLACE AT 4.5-5 BPM. -5 BPM,600 STROKES,11%FLOW,550 PSI. -4.5 BPM,900 STROKES,9-10%FLOW,890 PSI. STARTED LOSING RETURNS,STOP WORKING PIPE AND SET LINER WITH SHOE AT 9310'. CONTINUE TO DISPLACE AT 4.5 BPM,1100 STROKES,2%RETURN FLOW INTERMITTENT,1220 PSI. SLOW DOWN TO 3 BPM: -1200 STROKES,1050 PSI. -1300 STROKES,1110 PSI. -1400 STROKES,1230 PSI. -1500 STROKES,1170 PSI. -1580 STROKES,1500 PSI.BUMP PLUG,HOLD FOR 5 MIN, BLEED OFF CHECK FLOATS, FLOATS HELD,CIP AT 15:49 -LOST 20 BBLS THROUGHT JOB 16:00 - 16:30 0.50 CASING P INTI PRESSURE UP TO SET LINER HANGER, STARTED TO SEE RETURNS. -SET LINER ON BOTTOM AT 9312' -PERFORM A MECHANICAL RELEASE PER BAKER REPRESENTATIVE. -RELEASE WITH 5 LEFT HAND REVOLUTIONS,PICK UP 6'TO EXPOSE DOGS,SLACK OFF TO SET ZXPN LINER TOP PACKER,ROTATE AT 5 RPM, SET DOWN 40K TO CONFIRM PACKER IS SET. 16:30 - 19:00 2.50 CEMT P INTI CIRCULATE BOTTOMS UP AT 482 GPM,1780 PSI. 10 BBLS OF CEMENT SEEN BACK AT BOTTOMS UP. OBSERVED AN INCREASE IN CUTTINGS OVER THE SHAKERS,CONTINUE TO CIRCULATE UNTIL SHAKERS WERE CLEAN. 19:00 - 20:00 1.00 CEMT P INTI FLUSH STACK OF ANY CEMENT AND FUNCTION RAMS BLOW DOWN KILL AND CHOKE LINE TO CLEAR OF ANY CEMENT. LAY DOWN CEMENT HEAD. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 13 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release: 6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 20:30 0.50 CEMT P INTI FLOW CHECK, PUMP DRY JOB AND PULL 4" DRILL PIPE OUT OF THE HOLE. -PUW=175K,SOW= 150K. PULLED 2 STANDS AND PUW INCREASED TO 200K AND STARTED SWABBING. FLOW CHECK INDICATED WELL WAS STATIC. RUN 2 STANDS BACK IN. 20:30 - 22:00 1.50 CEMT P INTI CIRCULATE BOTTOMS UP AT 484 GPM,1670 PSI. RECIPROCATE PIPE. OBSERVED AN INCREASE IN CUTTINGS AT BOTTOMS UP. 22:00 - 00:00 2.00 CEMT P INTI PULL OUT OF THE HOLE WITH 4"DRILL PIPE FROM 6581'TO 2021'. 5/14/2012 00:00 - 01:30 1.50 CEMT P INTI CONTINUE TO PULL OUT OF THE HOLE FROM 2021'TO 30'. 01:30 - 02:30 1.00 CEMT P INTI LAY DOWN RUNNING TOOL, PULL WEAR BUSHING,MAKE UP STACK WASHER AND FLUSH BOP STACK. 02:30 - 03:00 0.50 BOPSUR P INTI LAY DOWN STACK WASHER,CLEAN AND CLEAR RIG FLOOR OF TOOLS NOT NEEDED FOR UPCOMING OPERATIONS. SUCK OUT BOP STACK AND PREP FOR CHANGING OUT I RAMS. 03:00 - 05:30 2.50 BOPSUR P INTI CHANGE OUT UPPER RAMS FROM 7"TO. 3-1/2"X 6"VARIABLES. -CHANGE OUT SAVER SUB ON TOP DRIVE. 05:30 07:00 1.50 BOPSUR P INTI MAKE UP 2-4"FULL OPENING SAFETY VALVES,1 -3-1/2"FULL OPENING SAFETY VALVE,4"TEST JOINT TO UPPER TEST PLUG. RIG UP TO TEST EQUIPMENT AND CHART FOR UPCOMING BOPE TEST.CLEAN OUT AIR LINE UNDER RIG FLOOR. 07:00 - 15:00 8.00 BOPSUR P INTI TEST BOPE WITH 4"AND 4-1/2"TEST JOINT. TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH, RAMS 25.0 PSI LOW.4000 PSI HIGH FOR 5 MINUTES EACH. -TEST WITNESSED BY CO REP. DUNCAN I ! FERGUSON,DDI TOOLPUSHER BOBBY INGRAM 15:00 - 16:00 1.00 BOPSUR P I NT1 I RIG DOWN TEST EQUIPMENT AND BLOW DOWN LINES. 16:00 - 17:00 1.00 BOPSUR P INTI TEST CASING TO 4,000-PSI FOR 30-MINUTES. -LOST 40 PSI IN FIRST 15 MINUTES -LOST 10 PSI IN LAST 15 MINUTES -SEE ATTACHMENT. 17:00 - 18:30 1.50 BOPSUR P INTI RIG DOWN TEST EQUIPMENT AND BLOW DOWN LINES. MOBILIZE BHA TO THE RIG FLOOR. 18:30 - 00:00 5.50 DRILL P INTI MAKE UP PRODUCTION BHA#4 AND RUN IN THE HOLE TO 2754'. 5/15/2012 00:00 - 05:30 5.50 DRILL P INTI RIH WITH PRODUCTION BHA FROM 3,097'TO 6,421'. FILL DP EVERY 20 STANDS. ENTER TOP OF 7"LINER AT 6,581', NO ISSUES. CONTINUE RIH TO 9,080'. CIRCULATE DP VOLUME AT 60-SPM,245-GPM, 2000-PSI. -MW IN 10.3-PPG,MW OUT 10.3-PPG SPR 9054'MD',8406'TVD MW 10.3 PPG. -#1 MP 2-BPM 450-PSI,3-BPM 650-PSI -#2 MP 2-BPM 440-PSI,3-BPM 650-PSI Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 14 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project: Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 07:30 2.00 DRILL P INTI SLIP AND CUT DRILLING LINE, SERVICE TOP DRIVE. EMPTY PITS,STATION TRUCKS FOR UPCOMING DISPLACEMENT. MONITOR WELL ON TRIP TANK.STATIC 07:30 - 09:30 2.00 DRILL P INTI DROP 1.76"ACTIVATION BALL DOWN DRILL STRING FOR WELL COMMANDER. RIH FROM 9,080'TO 9,202' TAG UP AT 9,204. PUMP 20-SPM,84-GPM,500-PSI. BALL SEATED 160-STROKES. PRESSURE INCREMENTALLY TO 3,400 PSI AND SHIFT WELL COMMANDER OPEN. RACK BACK 1 STAND AND CONTINUE WITH CIRCULATION. 09:30 - 11:30 2.00 DRILL P INTI PJSM WITH ALL PERSONNEL, DISPLACE WELL TO 8.5-PPG POWER PRO. -PUMP 40-BBLS,8.9-PPG SALT WATER SPACER. -PUMP 40-BBLS,8.5-PPG HI VIS SWEEP. -PUMP 550-BBLS,8.5-POWER PRO SF. ICP 100-SPM,409-GPM,2070-PSI,60-RPM,7K TRQ. FCP 103-SPM.420-GPM,790-PSI,60-RPM,3K TRQ. 11:30 - 13:30 2.00 DRILL P INTI BLOW DOWN TOP DRIVE -8.5-PPG MW SURFACE TO SURFACE, MONITOR WELL FOR 30-MINUTES, PERFORM NEGATIVE PRESSURE TEST ON I7"DRILLING LINER.WELL STATIC NO FLOW I OBSERVED, NO PRESSURE BUILD-UP DURING SHUT IN PORTION OF TEST. H APPROVAL TO PROCEED GRANTED BY WTL. 13:30 - 14:30 1.00 DRILL P INTI DROP CLOSING BALL FOR WELL COMMANDER. PRESSURE TO 1,000-PSI AND HOLD FOR 30-SECONDS. PRESSURE TO 2,300-PSI, WELL COMMANDER CLOSED BY INDICATION OF PUMP PRESSURE INCREASE FROM 90-PSI TO220-PSI AND COMMUNICATION TO MWD TOOL. 14:30 - 17:00 2.50 DRILL P INTI DRILL 7"LINER SHOE TRACK FROM LANDING COLLAR AT 9.230'HARD CEMENT. DRILL 20'OF NEW HOLE_FROM 9,312'TO 9,332'-MD. _.._ -PUW 195K,SOW 175K, ROT 184K. H RPM 30,TRQ ON 3K,TRQ OFF 3K. -GPM 250, PSI ON 1020, PSI OFF 1090. -WOB 5-10K -FIRE DRILL CRT=135-SECONDS. 17:00 - 19:00 2.00 DRILL P INTI CIRCULATE BOTTOMS UP AT 250-GPM, 1250-PSI 30-RPM,TRQ-3K. 19:00 - 21:00 2.00 DRILL P PROD1 PERFORM FIT TO EMW 11.33-PPG. MW IN :.5-PPG MW OUT 8.5-PPG. OBTAIN ODE APPROVAL O PROCEED **REFERENCE ATTACHED CHARTS** Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 15 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release: 6/6/2012 Rig Contractor DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 DRILL P PROD1 _DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9,332'TO 9,378'. -PUW=195K,SOW=175K. -GPM=250, PSI ON=1340, PSI OFF= 1220. -WOB=25K. AST=2.72 HRS,ART=0 HRS,ADT=2.72 HRS,JARS=91.9 HRS,BIT=2.72 HRS. SPR 9,272'-MD,8,622'-TVD MW 8.5-PPG. -#1 MP 2-BPM,310-PSI,3-BPM,430-PSI -#2 MP 2-BPM,320-PSI,3-BPM,440-PSI DOWNHOLE BARRIERS -BOPE -KILL WEIGHT FLUID 5/16/2012 00:00 - 12:00 12.00 DRILL P ' PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9,378'TO 9,650'. -PUW=205K,SOW=178K. -RPM=30,TRQ ON=3K,TRQ OFF=3K. -GPM=250, PSI ON=1420, PSI OFF= 1320. -WOB=25K. -MW IN 8.5-PPG,MW OUT 8.5-PPG -SPILL DRILL CRT=99-SECONDS. AST=8.33 HRS,ART=0.23 HRS,ADT=8.56 • HRS,JARS=100.5 HRS, BIT=8.56 HRS. 12:00 - 00:00 12.00 DRILL P j PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9,650'TO10,025'. -PUW=199K,SOW=170K. -RPM=60,TRQ ON=6K,TRQ OFF=4K. -GPM=250, PSI ON= 1440, PSI OFF= 1370. -WOB=15K -SPILL DRILL CRT=95-SECONDS. MW IN 8.5-PPG,MW OUT 8.5-PPG AST=6.22 HRS,ART=0.98 HRS,ADT=7.22 HRS,JARS= 107.7 HRS, BIT= 15.78 HRS. 1 SPR 9,761'-MD,9,019'-TVD MW 8.5-PPG. !-#1 MP 2-BPM,350-PSI,3-BPM,480-PSI I-#2 MP 2-BPM,360-PSI,3-BPM,480-PSI DAILY TOTALS:AST= 14.55 HRS,ART= 1.21 HRS,ADT= 15.78 HRS,JARS= 107.7 HRS, BIT = 15.78 HRS. DOWNHOLE BARRIERS-8.5-PPG POWER PRO MUD 5/17/2012 00:00 - 00:30 0.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION j 1 UPLE FROM 10,025'TO 10,056'-MD. -AT 10,050'SIGNIFICANT DECREASE IN ROP. FREQUENT STALLING OF MUD MOTOR OBSERVED WITH MINIMAL WOB. -PUW= 199K,SOW= 170K ROW= 190K. RPM=60,TRQ ON=6K,TRQ OFF=4K. -GPM=250, PSI ON= 1440, PSI OFF= 1370. -WOB= 15K -MW IN 8.5-PPG,MW OUT 8.5-PPG. SPR 10,056'-MD,9,037'-TVD MW 8.5-PPG. -#1 MP 2-BPM,350-PSI,3-BPM,480-PSI -#2 MP 2-BPM,360-PSI,3-BPM,480-PSI Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 16 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C:(6,346,237.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 04:30 4.00 DRILL P PROD1 !CIRCULATE HOLE CLEAN FOR TRIP,ROTATE AND RECIPROCATE DP WHILE PUMPING HI-VIS SWEEP SURFACE TO SURFACE.NO INCREASE IN CUTTINGS OBSERVED OVER SHAKERS WHEN SWEEP TO SURFACE. CONTINUE TO CIRCULATE ADDITIONAL BOTTOMS UP UNTIL HOLE IS CLEAN. -250 GPM,1330-PSI,40 RPM, 4K-TRQ. 04:30 - 05:30 1.00 DRILL P PROD1 MONITOR WELL FOR 10-MINUTES,WELL STATIC. -BLOW DOWN TD,LINE UP ON TRIP TANK -POOH ON ELEVATORS FROM 10,030'TO 9270'-MD. -NO OVERPULL IN OPENHOLE OR ISSUES WITH TRIP TO 7"LINER. -HOLE FILL VOLUMES CORRECT. -MW IN 8.5-PPG,MW OUT 8.5-PPG 05:30 - 10:30 5.00 DRILL P PROD1 MONITOR WELL FOR 10-MINUTES AT 7" LINER,WELL STATIC. -PUMP DRY JOB AND BLOW DOWN TD. -CONTINUE TO POOH ON ELEVATORS FROM 9,270'TO 247'-MD. -NO PROBLEMS POOH,DISPLACEMENT CORRECT. -MW IN 8.5-PPG,MW OUT 8.5-PPG. 10:30 - 14:00 3.50 I DRILL P PROD1 MONITOR WELL FOR 10-MINUTES PRIOR TO PULLING BHA INTO BOPE,WELL STATIC- PJSM FOR BHA AND SOURCE HANDLING -REMOVE SOURCE FROM ADN4, LAY BHA#4. 1-NO VISUAL DAMAGE OBSERVED ON BHA COMPONENTS. -BIT GRADE:4-7-BT-A-F-7-LT-BHA 14.00 - 14:30 0.50 DRILL P PROD1 CLEAN AND CLEAR RIG FLOOR -MAKE SERVICE BREAK ON WELL I COMMANDER CIRCULATING SUB AND REMOVE BALLS. 14:30 - 16:30 2.00 DRILL P PROD1 PICK UP BHA#5,MAKE UP NEW BIT AND MUD MOTOR. LOAD SOURCE AND CONTINUE TO MAKE UP BHA. -FIRE DRILL CRT=110 SECONDS. 16:30 - 17:30 1.00 DRILL N 83.00 PROD1 SCHLUMBERGER OSC ALERTS TO QUESTIONABLE CONFIGURATION OF IMPULSE/MWD PROGRAMING. REMOVE SOURCE AND REPROGRAM MWD TOOL. RELOAD SOURCE. 17:30 - 00:00 6.50 DRILL P PROD1 CONTINUE TO MAKE UP BHA#5 -PERFORM SHALLOW HOLE TEST OF MWD/ LWD TOOLS,TEST GOOD. -CONTINUE TO RIH ON 4"_QP TO..8..Z95'-MD. -FILL PIPE EVERY 20 STANDS. MW IN 8.5-PPG,MW OUT 8.5-PPG. 1-NO ISSUES ON TRIP. 1 *DOWNHOLE BARRIERS-8.5-PPG POWER PRO MUD* Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 17 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) l Project:Prudhoe Bay Site:PBZ Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) ;— 5/18/2012 00:00 - 03:30 3.50 DRILL P PROD1 `CONTINUE RIH WITH BHA#5 FROM 8,795'TO MD ENCOUNTER TIGHT SPOT AT 9,686.MAKE UP TD AND STAGE UP PUMP CAUTIOUSLY WORK&REAM TIGHT AREA DUE TO PREVIOUSLY PULLED 7/16"UNDER GAUGE BIT. 250-GPM,1,330-PSI,40-RPM,TRQ-5K PUW-210K,SOW 170K 03:30 - 04:30 1.00 ! DRILL P I PROD1 CONTINUE RIH FROM 9,686'TO 10,056'-MD WASH LAST STAND TO TD 10,056'-MD 250-GPM,1540-PSI,60-RPM,4K-TRQ PUW-195K,SOW-175K,RW-185K 04:30 - 12:00 7.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 10,056'TO 10,171'-MD 250-GPM,1540-PSI,60-RPM,4K-TRQ PUW-199K,SOW-165K,RW-183K MW IN 8.5-PPG,MW OUT 8.5-PPG. • SPR 10,503'-MD,9,008'-TVD,MW 8.5-PPG, 13:50 HRS. -#1 MP 2-BPM,390-PSI,3-BPM,510-PSI -#2 MP 2-BPM,380-PSI,3-BPM,520-PSI AST=2.23 HRS,ART=2.41 HRS,ADT=4.64 HRS,JARS=112.8 HRS, BIT=4.64 HRS. ,1/2 LB OF STEEL RECOVERED FROM DITCH 'MAGNETS. 12:00 20:30 8.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HALE FROM 10,410'TO 10,746'-MD. DROP IN ROP TO 15-20 FT/HR OBSERVED 'AFTER 10,695'. 250-GPM,1450-PSI,80-RPM,6K-TRQ, 20K-WOB. PUW-198K,SOW-169K,RW-184K MW IN 8.6-PPG,MW OUT 8.6-PPG. SPR 10,746'-MD, 8,967'-TVD,MW 8.6-PPG, 23:00 HRS. 1-#1 MP 2-BPM,390-PSI,3-BPM,510-PSI #2 MP 2-BPM,400-PSI,3-BPM,520-PSI AST= 1.25 HRS,ART=5.09 HRS,ADT=6.34 HRS,JARS= 119.2 HRS, BIT=6.34 HRS. 24 HR TOTAL:AST=3.48 HRS,ART=7.50 HRS,ADT=10.98 HRS,BIT=10.98 HRS. 20:30 - 00:00 3.50 DRILL P PROD1 PUMP HI-VIS SWEEP SURFACE TO SURFACE. ROTATE AND RECIPROCATE DP. 10-20%INCREASE IN CUTTINGS WHEN SWEEP SEEN AT SURFACE. CONTINUE TO 1RACK BACK ONE STAND OF DRILL PIPE TO 10695'.CIRCULATE ADDITIONAL BOTTOMS UP UNTIL HOLE CLEANED UP. 250-GPM,1380-PSI,80-RPM,TRQ-3K PUW-205,SOW-175, RT-175 MW IN 8.6-PPG,MW OUT 8.6-PPG I*DOWN HOLE BARRIERS*-8.6-PPG POWER 1 PRO MUD. OA PRESSURE 870-PSI. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 18 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/19/2012 00:00 - 00:30 0.50 DRILL P PROD1 10,695-MD CONTINUE TO CIRCULATE AND CONDITION HOLE CLEAN. -ROTATE AND RECIPROCATE DP 250-GPM,1380-PSI,80-RPM,TQ-3K MW IN 8.6-PPG,MW OUT 8.6-PPG 00:30 - 02:00 1.50 DRILL P PROD1 MONITOR WELL FOR 10-MINUTES,WELL STATIC. -LINE UP TRIP TANK -POOH ON ELEVATORS FROM 10,695'TO 9,270'-MD. -MONITOR WELL AT 7"SHOE.WELL STATIC. MW IN 8.6-PPG,MW OUT 8.6-PPG 02:00 - 06:30 4.50 DRILL P PROD1 POOH ON ELEVATORS FROM 9,270'TO 438'-MD ESTABLISH CIRCULATION AT 9,270'AND PUMP DRY JOB, BLOW DOWN TOP DRIVE MW IN 8-6-PPG, MW OUT 8.6-PPG NO ISSUES ON TRIP,DISPLACEMENT CORRECT. 06:30 - 09:00 2.50 DRILL : P PROD1 MONITOR WELL FOR 10-MINUTES PRIOR TO PULLING BHA INTO BOPE,WELL STATIC- PJSM FOR BHA AND SOURCE HANDLING -REMOVE SOURCE FROM ADN4, LAY BHA#5. -NO VISUAL DAMAGE OBSERVED ON BHA COMPONENTS. -BIT GRADE:3-6-BT-A-E-I-LT-PR 09:00 - 09:30 0.50 DRILL P PROD1 GREASE,SERVICE AND VISUALLY INSPECT TOP DRIVE AND DRAWWORKS. 09:30 - 16:30 7.00 DRILL P PROD1 MAKE UP BHA#6 AND RUN IN THE HOLE 248' TO 9,270'. -FILL PIPE EVERY 20 STANDS. 1 MW IN 8.6-PPG,MW OUT 8.6-PPG. NO ISSUES ON TRIP,DISPLACEMENT CORRECT TO 9,270' -OA PRESSURE 300-PSI,BLEED TO 50 PSI. 16:30 - 18:30 2.00 DRILL P PROD1 CUT AND SLIP DRILLING LINE. -OUT OF CRITICAL PATH ADJUST IRON ROUGHNECK LINKAGE. 18:30 - 19:30 1.00 DRILL P PROD1 RIH ON ELEVATORS FROM 9,270'TO 10,439'. PUW-202K,SOW-170K PRIOR TO ENTERING OPEN HOLE AT 9,312' MW IN 8.6-PPG,MW OUT 8.6-PPG. NO ISSUES ON TRIP TO 10,439'. DISPLACEMENT CORRECT. 19:30 - 20:30 1.00 DRILL P PROD1 REAM DOWN AND LOG FROM 10,695'TO 10.746'. -CHECK SHOT SURVEY 10,439',10,499', 10,535',10596'AND 10,659'. 250-GPM,1400-PSI,60-RPM,TQ OFF-6-7K. 20:30 - 22:30 2.00 DRILL P PROD1 INTERMITTENT PACKING OFF WHEN REAMING DOWN FROM 10,720'TO 10,746' WORK AND RECIPROCATE DP, PUMP HI-VIS SWEEP SURFACE TO SURFACE -OBSERVE 90-100%INCREASE IN CUTTINGS WHEN SWEEP TO SURFACE. -CIRCULATE HOLE CLEAN. -OBTAIN SPR PRIOR TO DRILLING AHEAD. 250-GPM,1400-PSI,60-RPM,TQ OFF-6-7K. MW IN 8.6-PPG,MW OUT 8.6-PPG Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 19 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. I UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) 22:30 - 00:00 1.50 DRILL P PROD1 DIRECTIONALLY DRILL 6-1/8"PRODUCTION HOLE FROM 10,746'TO 10,770'-MD 250-GPM,1530-PSI ON,1410-PSI OFF 80-RPM,6K-TRQ ON,5K TRQ OFF PUW-198K,SOW-169K,RW-184K -MW IN 8.6-PPG,MW OUT 8.6-PPG. SPR 10,722'-MD, 8,970'-TVD,MW 8.6-PPG, 22:30 HRS. -#1 MP 2-BPM,370-PSI,3-BPM,510-PSI -#2 MP 2-BPM,380-PSI,3-BPM,510-PSI AST=0.0 HRS,ART= 1.28 HRS,ADT= 1.28 HRS,JARS= 120.5 HRS, BIT= 1.28 HRS. *DOWNHOLE BARRIERS-8.6 POWER PRO MUD` 5/20/2012 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 10,770'TO 11,265-MD 250-GPM, PSI ON-1590, PSI OFF 1490,80-RPM, TRQ ON 7K,TRQ OFF 4K PUW-198K,SOW-159K, RW-179K -MW IN 8.5-PPG,MW OUT 8.5-PPG. SPR 11,165'-MD, 8,895'-TVD,MW 8.5-PPG, i 10:30 HRS. #1 MP 2-BPM,430-PSI,3-BPM,570-PSI -#2 MP 2-BPM,430-PSI,3-BPM,580-PSI AST=0.69 HRS,ART=7.0 HRS,ADT=7.69 HRS,JARS=128.2 HRS,BIT=8.97 HRS. 12:00 - 00:00 12.00 DRILL P , PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 11,265'TO 11575-MD 1250-GPM, PSI ON-1580, PSI OFF-1420,60-RPM, TRQ ON 6K,TRQ OFF 4K PUW-196K,SOW-158K,RW-182K MONITOR WELL 10-MINUTES AT 11,475'-MD, WELL STATIC. -MW IN 8.6-PPG,MW OUT 8.6-PPG. SPR 11,452'-MD,8,868'-TVD,MW 8.5-PPG, 19:30 HRS. -#1 MP 2-BPM,410-PSI,3-BPM,570-PSI -#2 MP 2-BPM,400-PSI,3-BPM,550-PSI AST=5.11 HRS,ART= 1.94 HRS,ADT=7.05 HRS, JARS= 136 HRS, BIT= 16.02 HRS. 24 HR TOTAL AST=5.80 HRS,ART=8.94 1 HRS,ADT=14.74 HRS. I"DOWNHOLE BARRIERS-8.6 POWER PRO MUD* 5/21/2012 00:00 - 12:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION _HOLE FROM 11,575'TO 11,805'-MD 250-GPM, PSI ON-1630, PSI OFF-1480,40-RPM, TRQ ON 7K,TRQ OFF 5K PUW-199K,SOW-158K, RW-179K -MW IN 8.6-PPG,MW OUT 8.6-PPG. AST=6.84 HRS,ART=1.64 HRS,ADT=8.48 HRS,JARS=144.4 HRS,BIT=24.5 HRS. OA PRESSURE AT 10:20 HRS=670 PSI. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 20 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 18:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 11805'TO FINAL TD 11,955"_MD, 9039'7TVD ,250-GPM, PSI ON-1610, PSI OFF-1500,80-RPM, TRQ ON 7K,TRQ OFF 5K PUW-212K,SOW-162K,RW-185K -MW IN 8.6-PPG, MW OUT 8.6-PPG. -5 MINUTE FLOW CHECK AT 11,831', NO FLOW. **D2-DRILL,KICK WHILE DRILLING CRT=75 SECONDS.'* SIMULATE FAST SHUT PROCEDURE WITH ANNULAR PREVENTER BEING CLOSED. STANDING ORDERS TO DRILLER FOLLOWED AS REQUIRED. AST= 1.92 HRS,ART= 1.12 HRS,ADT=3.04 HRS,JARS= 147.5 HRS, BIT=27.54 HRS. DAILY TOTALS:AST=8.76 HRS,ART=2.76 HRS,ADT=11.52 HRS 18:00 - 20:30 2.50 DRILL P PROD1 PUMP HI-VIS SWEEP SURFACE TO SURFACE WHILE ROTATING AND RECIPROCATING DRILL STRING. 250-GPM,1,500-PSI,100-RPM MINIMAL INCREASE IN CUTTINGS OBSERVED OVER SHAKERS WHEN SWEEP RETURNED ( TO SURFACE. SPR 11,955'-MD,9,063'-TVD,MW 8.5-PPG, 19:30 HRS. -#1 MP 2-BPM,460-PSI,3-BPM,620-PSI • -#2 MP 2-BPM,460-PSI,3-BPM,610-PSI 20:30 - 00:00 3.50 DRILL P PROD1 MONITOR WELL AT TD 11,955'-MD,WELL STATIC_ -VERIFY DEPTH AND HOOKLOADS WITH MWD,VALUES CORRECT. DOWNLINK TO MWD,COMMAND FOR !INCREASED DATA POINTS FOR LOGGING. 1-BEGIN MAD PASS LOGGING FROM 11,955' TO 11,455'-MD I-80 RPM,250 GPM,1500 PSI 1-PULL EACH STAND AT 360 FT/HR MAXIMUM. *DOWNHOLE BARRIERS-8.6 POWER PRO !MUD* 5/22/2012 00:00 - 04:30 4.50 DRILL P PROD1 CONTINUE WITH MAD PASS LOGGING FROM 11,455'TO 10,770'-MD 80-RPM,250-GPM,1450-PSI,4-5K TRQ PULL EACH STAND AT 360 FT/HR MAXIMUM. MW IN 8.5-PPG,MW OUT 8.5-PPG 04:30 05:00 0.50 I DRILL P PROD1 WHILE LOGGING UP 10,770'-MD INCREASE IN DIFFERENTIAL PRESSURE WITH SLIGHT PACKING OFF.ATTEMPT TO WORK THROUGH AT REDUCED BLOCK SPEED, STILL INDICATIONS OF PACKING OFF. OBSERVE 10-20%INCREASE IN CUTTINGS AT SHAKER WHILE CIRCULATING. RIH ON ELEVATORS TO 10,980'NO ISSUES. PUW 195K,SOW 155K,RTW 175K Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 21 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 08:00 3.00 DRILL P PROD1 10,980'STAGE UP PUMP TO 250-GPM, 1450-PSI CIRCULATE AND CONDITION HOLE. PUMP HI-VIS SWEEP SURFACE TO SURFACE. ROTATE RECIPROCATE AT 80-RPM WITH 4K TORQUE. 20-30%INCREASE IN CUTTINGS OBSERVED WHEN SWEEP AT SURFACE. MONITOR WELL 10-MIN PRIOR TO COMMENCING MAD PASS LOGGING.WELL STATIC MW IN 8.5-PPG,MW OUT 8.5-PPG 08:00 - 12:00 4.00 DRILL P PROD1 CONTINUE MAD PASS LOGGING, POOH FROM 10,980'TO 10,175' PUMP 250-GPM, 1400 PSI,80-RPM ROTATE RECIPROCATE TIGHT AREA AT 10716'-10700', NO INDICATION OF TIGHT AREA AFTERWARDS. 12:00 - 17:00 5.00 DRILL P PROD1 CONTINUE MAD PASS LOGGING FROM 10,175'TO 9,500'. -CONTINUE TO BACK REAM POOH FROM 9,500'TO ABOVE 7"SHOE AT 9,312' -250-GPM,1410-PSI,80-RPM. 17:00 - 19:00 2.00 DRILL P PROD1 DROP 1.76"ACTIVATION BALL FOR WELL COMMANDER. PUMP 2-BPM,400-PSI.BALL ON SEAT AT 900 STROKES,90-BBLS. PRESSURE TO 1000-PSI AND HOLD FOR 30-SEC. PRESSURE TO 2400-PSI, HOLD FOR 30-SEC.VALVE SHIFTED OPEN AT 2740-PSI. CIRCULATE HI-VIS SWEEP AT: 400-GPM,940-PSI,100-RPM,3K-TQ. -450-GPM,1090-PSI. -500-GPM,1280-PSI. 19:00 - 21:00 2.00 DRILL P PROD1 MONITOR WELL FOR 10-MINUTES,NO FLOW. BLOW DOWN TOP DRIVE POOH ON ELEVATORS FROM 9,270', POSITION WELL COMMANDER AT 7"LINER TOP 6,801'. 21:00 23:00 2.00 DRILL ' P PROD1 CIRCULATE 3 BOTTOMS UP,PUMP HI-VIS SWEEP. 840-GPM,80-RPM,2K-TORQ. DROP 1.76" ACTIVATION BALL, PRESSURE TO 1000-PSI AND HOLD FOR 30 SECONDS, PRESSURE TO 2400-PSI AND OBSERVE WELL COMMANDER t + SHIFT CLOSED.. 23:00 - 00:00 1.00 DRILL P PROD1 RIH ON ELEVATORS FROM 6,801'TO 8,795', FILL PIPE EVERY 20 STANDS. MW IN 8.5-PPG,MW OUT 8.5-PPG. 1*DOWNHOLE BARRIERS-8.6 POWER PRO !MUD AND TESTED BOPE* 5/23/2012 100:00 - 01:00 1.00 DRILL 1 P PROD1 'CONTINUE RIH ON ELEVATORS F/8795'T/ 9270'FILL PIPE EVERY 20 STANDS. MW IN 8.5-PPG,MW OUT 8.5-PPG 01:00 - 03:30 j 2.50 t DRILL P PROD1 CONTINUE RIH ON ELEVATORS F/9,270'T/ ,11,965'-MD -WORK AREA AT 11,015'TO 11,032'DUE TO INDICATIONS OF TIGHT HOLE.WORK AND WIPE THROUGH SEVERAL TIMES.NO ISSUES THEREAFTER. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 22 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project: Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 07:30 4.00 DRILL P PROD1 STAGE UP PUMP, REAM LAST STAND TO TD AT 11,955' NO FILL ON BOTTOM. 250-GPM,1660-PSI,80-RPM,5K-TQ CIRCULATE HI VIS SWEEP SURFACE TO 'SURFACE -250-GPM,1730-PSI,80-RPM W/5K-TORQUE -PUW-205K,SOW-165K, ROT-180K PJSM AND PREPARATION IN PITS TO DISPLACE TO 8.6-PPG RHELIANT OBM PER PROGRAM. *DOWNHOLE BARRIERS-8.6 POWER PRO MUD AND TESTED BOPE* 07:30 - 18:00 10.50 DRILL P PROD1 OFFLOAD 8.6 PPG OBM FROM RIG BACK ONTO VAC TRUCKS.TRANSPORT OBM TO MUD PLANT FOR WEIGHT UP TO 8.9 PPG. -WEIGHT UP POWER PRO MUD SYSTEM FROM 8.6 TO 8.9 PPG WHILE CIRCULATING. -250-GPM,1530-PSI,100-RPM, 5K TORQUE. VISUAL DERRICK INSPECTION REMOVE ICE FROM DERRICK. 18:00 - 20:00 2.00 DRILL P PROD1 PJSM FOR WIPER TRIP TO 7"SHOE. -MONITOR WELL FOR 10 MINUTES, NO FLOW. 1 -POOH F/11,965'T/9270'-MD MW IN 8.9-PPG,MW OUT 8.9-PPG. SPR 11,949'-MD,9,036'-TVD,MW 8.9-PPG, 18:00 HRS. -#1 MP 2-BPM,500-PSI,3-BPM,660-PSI 20:00 - 22:00 2.00 DRILL P , j PROD1 CIRCULATE BOTTOMS UP AT 9,270'ABOVE 17"SHOE -MONITOR WELL 10-MIN, NO FLOW -250-GPM.1400-PSI,40-RPM,2K TORQUE P/U WT= 195K, DN WT= 170K -SPILL DRILL,CRT=83 SECONDS. 22:00 - 00:00 2.00 DRILL P PROD1 PJSM- SLIP AND CUT DRILLING LINE. -INSTALL FULL OPENING SAFETY VALVE. -SLIP AND CUT DRILLING LINE. -RIG AND TOP DRIVE SERVICE AND INSPECTION. -CHANGE OUT MWD SENSATOR ON TOP OF ITHE STAND PIPE. -REMOVE FULL OPENING SAFETY VALVE. MONITOR WELL ON TRIP TANK.2-BPH STATIC LOSS RATE WHILE SERVICING RIG. • TOTAL 24 HR LOSS= 17 BBL OA PRESSURE= 680 PSI AT 22:00 HRS. *DOWNHOLE BARRIERS-8.9 POWER PRO MUD AND TESTED BOPE* 5/24/2012 00:00 - 03:30 3.50 DRILL P PROD1 RIH ON ELEVATORS FROM 9,270'-11,929'-MD -FILL DP EVERY 20 STANDS. -10,738'AND 11,736' 15K LOSS IN HOOKLOAD. P/U AND WIPE SAME. NO INDICATIONS SEEN AFTERWARDS. -MW IN=8.9-PPG,MW OUT=8.9-PPG *HOLE TOOK 2-BBL OVER CALCULATED DISPLACEMENT* Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 23 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project: Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) _ (ft) 03:30 - 06:00 2.50 DRILL P PROD1 STAGE UP PUMP,WASH DOWN LAST STAND DOWN TO TD 11,955-MD -NO FILL ON BOTTOM -ROTATE AND RECIPROCATE FULL STAND OF DP WHILE CIRCULATING BOTTOMS UP. -250-GPM,1,690-PSI,60-RPM,5K-TORQUE -P/U WT=195K,DN WT=170K,RT WT=180K -MW IN=8.9-PPG,MW OUT 8.9-PPG -OFFLOAD FROM VAC TRUCKS TO PITS 8.9-PPG RHELIANT OBM 06:00 - 09:00 3.00 DRILL P PROD1 PJSM ON DISPLACING HOLE FROM 8.9 PPG POWER PRO TO 8.9 PPG OBM -PUMP 40 BBL 8.9 PPG KCL SPACER -PUMP 40 BBL 9.8 PPG OBM SPACER -COMPLETE DISPLACEMENT WITH 8.9 PPG RHELIANT OBM. -TOTAL STROKES=7128. 09:00 11:00 2.00 DRILL P ! • PROD1 LAY DOWN SINGLE TO 11,929'. -BLOW DOWN TOP DRIVE AND MONITOR WELL. -SIM OPS: CLEAN PITS OF 8.9 PPG POWER PRO MUD. 11:00 - 14:30 3.50 DRILL P PROD1 'CIRCULATE AND CONDITION(SHEARING) 8.9 PPG RHELIANT MUD -250 GPM AT 2450 PSI -40 RPM AT 5K TORQUE SPR 11,906'-MD,9,030'-TVD,MW 8.9-PPG, 12:00 HRS. j . -#1 MP 20 SPM,510-PSI,30 SPM,730-PSI -#2 MP 20 SPM,510-PSI,30 SPM,730-PSI 14:30 - 16:00 1.50 DRILL P PROD1 POOH W/ELEVATORS FROM 11,929'-10,505' -SCREW INTO EVERY STD TO CONTROL FLUID. 16:00 - 18:00 2.00 DRILL P PROD1 REAM FROM 10,505-10,980'.INTERMITTENT PACKOFFS FROM 10720'-10750' -250 GPM AT 2500 PSI. -5-10K WOB 18:00 - 18:30 0.50 DRILL P PROD1 POOH FROM 10,980'-10,505'.WEIGHT INCREASED FROM 210K-245K IN THE 41N SHALE AND 210K-220K ABOVE SHALE 18:30 - 20:00 1.50 DRILL • P PROD1 RIH FROM 10,505'-11,929' -MH SINGLE FROM LAST STD AND TAG UP AT 11,957'. 20:00 - 23:00 3.00 DRILL P PROD1 PJSM -PUMP 22 BBL 10.1 PPG WEIGHTED SWEEP AT 11,957'. -SWEEP BACK AT 6420 STKS. -250 GPM AT 2480 PSI -80 RPM 5K TORQUE. ,SPR 11,924'-MD,9,024'-TVD,MW 8.9-PPG, 23:00 HRS. -#1 MP 20 SPM,510-PSI,30 SPM,740-PSI -#2 MP 20 SPM,500-PSI,30 SPM,740-PSI 23:00 - 00:00 1.00 DRILL P PROD1 .10 MINUTE FLOW CHECK-NO FLOW. -POOH ON ELEVATORS FROM 11,929'-11,740'. -WORK THROUGH TIGHT SPOTS AT 11,800', 11,780'AND 11,754'WITH A MAX OVERPULL OF 35K.WIPE FOUR TIMES AND IT CLEANED UP. Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 24 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 ' Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/25/2012 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE TO POOH ON ELEVATORS FROM 11,740'-9,840'. ENCOUNTER TIGHT SPOTS 10,972'-10,958' AND 10,757-10,722'WORK THROUGH AREAS MULTIPLE TIMES. -PUW 220K,SOW 165K. MW IN 8.9-PPG,MW OUT 8.9-PPG 03:00 - 04:00 1.00 DRILL P PROD1 9,762'-MD,30K OVERPULL TO 250K,WORK TIGHT AREA, NO REDUCTION IN OVERPULL. -RIH ON ELEVATORS TO 9,935' -STAGE UP PUMP 250-GPM,2,290-PSI RECIPROCATE, ROTATE FULL STAND THROUGH TIGHT AREA AT 9,762' 80-RPM,5K-TRQ, CIRCULATE 106-BBL TOTAL. -P/U THROUGH AREA WITHOUT PUMP, NO • OVERPULL OBSERVED. -PUW 220K,SOW 165 04:00 - 05:00 1.00 DRILL P PROD1 'CONTINUE TO POOH ON ELEVATORS FROM 9,935'-9,270' HOLE LOOKS GOOD FROM 9,935'INTO 7" LINER AT 9,312' -MONITOR WELL 10-MINUTES.WELL STATIC 05:00 - 09:00 4.00 DRILL P PROD1 CIRCULATE CASING CLEAN -250-GPM,2,300-PSI ROTATE, RECIPROCATE DP 80-RPM,4K-TRQ l -COMMUNICATE WITH TOWN ON PLAN FORWARD. -D1 DRILL, KICK WHILE TRIPPING,CRT: 79-SECONDS. :SPR 11,955'-MD,9,024-TVD,MW 8.9-PPG #1 MP 2-BPM=510-PSI /3-BPM=740-PSI #2 MP 2-BPM=500-PSI/ 3-BPM=740-PSI 09:00 - 10:00 1.00 DRILL P PROD1 MONITOR WELL 10-MINUTES,WELL STATIC -PUMP DRY JOB I-POOH ON ELEVATORS FROM 9,270'- POSITION WELL COMMANDER VALVE AT 7" 1 LINER TOP 6,581' 10:00 - 12:00 2.00 DRILL P PROD1 CIRCULATE 7"x 9-5/8"LINER TOP CLEAN. -SHIFT OPEN WELL COMMANDER WITH 1.75"-OD ACTIVATION BALL. -PUMP BALL TO SEAT, PRESSURE INCREMENTALLY FROM 1,000-PSI TO 2,870-PSI,VALVE SHIFTED OPEN AT 2,870-PSI. -STAGE UP PUMP RATE AND CIRCULATE HOLE CLEAN. 350-GPM,1,220-PSI 400-GPM,1,680-PSI 450-GPM,2,020-PSI 500-GPM,2,340-PSI 550-GPM,2,790-PSI SHIFT CLOSED WELL COMMANDER WITH 1.75"-OD ACTIVATION BALL.VALVE SHIFTED CLOSED AT 2,780-PSI 12:00 - 12:30 0.50 DRILL P PROD1 SERVICE TOPDRIVE,BLOCKS AND DRAWWORKS BLOW DOWN TOPDRIVE Printed 6/18/2012 11:26:46AM North America -ALASKA- BP Page 25 of 25 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:4/28/2012 End Date: X3-011 RK-C: (6,346,237.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 16:00 3.50 DRILL P PROD1 RIH ON ELEVATORS FROM 6,701 -11,955' -FILL DP EVERY 20 STANDS 1 -MONITOR WELL 10-MINUTES AT 7"SHOE 9,312,' WELL STATIC -HOLE LOOKS GOOD. 1 MD TOTCO SENSOR NOT INDICATING PROPER TRIP TANK VOLUME. -CONTACT AND INFORM WTL. RIG GRANTED AUTHORIZATION TO PROCEED. -MANUALLY STRAP TRIP TANK FOR PROPER DISPLACEMENT. PIT WATCHER OR DESIGNEE OBSERVING TRIP TANK DURING THE ENTIRE TRIP. -MW IN 8.9-PPG,MW-OUT 8.9-PPG 16:00 20:30 4.50 DRILL P PROD1 CIRCULATE AND CONDITION HOLE -250-GPM,2.650-PSI ROTATE AND RECIPROCATE FULL STAND 20:30 00:00 3.50 DRILL P PROD1 IAT 100-RPM,T6K-TRO - 11,955'MONITOR WELL 10-MINUTES,WELL STATIC PUMP DRY JOB -POOH ON ELEVATORS FROM 11,955 TO 7" SHOE AT 9,312' -WORK AND WIPE INTERMITTENT TIGHT AREAS AT 11450',11088' WIPE FROM 10,885'TO 10792'AND 10,790 TO i 10,697' -MONITOR WELL 10-MINUTES AT 7"SHOE 9,312',WELL STATIC 1-DROP 2.40"-OD DRIFT DOWN DP WHILE AT !7"SHOE 9,312 FOR UPCOMING PRODUCTION LINER RUN. MW IN 8.9-PPG,MW OUT 8.9-PPG OA PRESSURE= 360 PSI AT 23:00 HRS. *DOWNHOLE BARRIERS-8.9 RHELIANT MUD AND TESTED BOPE* 5/26/2012 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE TO POOH ON ELEVATORS FROM 'TOP OF 7"LINER 6,581'-248' NO ISSUE ON TRIP, DISPLACEMENT CORRECT -MW IN 8.9-PPG,MW OUT 8.9-PPG 03:00 - 04:00 1.00 DRILL P PROD1 MONITOR WELL 10-MINUTES PRIOR TO PULLING BHA INTO BOP STACK. -PJSM FOR RA SOURCE AND BHA HANDLING. -PULL BHA, L/D JAR STAND,3 FLEX COLLARS AND WELL COMMANDER VALVE -REMOVE RA SOURCE FROM ADN4 AND SECURE IN CONTAINMENT SHIELD 04:00 - 05:00 1.00 DRILL P PROD1 CONTINUE TO L/D BHA L/D MWD,ADN, PONY COLLARS AND STABILIZER !-BREAK OUT BIT AND L/D MOTOR -NO ABNORMAL WEAR ON BHA OR VISUAL DAMAGE TO ANY COMPONENTS. BIT GRADE:2-4-WT-A-E-I-BT-TD 05:00 - 06:00 1.00 DRILL P PROD1 CLEAR RIG FLOOR AND PIPE-SHED OF BHA. -CLEAN AND CLEAR RIG FLOOR OF ALL OBM. Printed 6/18/2012 11:26:46AM North America-ALASKA- BP Page 1 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/26/2012 06:00 - 08:00 2.00 CASING P RUNPRD PJSM FOR R/U 4-1/2"LINER RUNNING EQUIPMENT. -R/U DOUBLE STACK TONGS AND COMPUTER FOR TORQUE TURN. -INSTALL 4-1/2"ELEVATORS,R/U TO RUN 4-1/2"LINER. 08:00 - 09:30 1.50 CASING P RUNPRD P/U 4-1/2, 12.6-LB/FT,PRODUCTION LINER SHOE TRACK -BAKERLOK SHOE TRACK.APPLY JET LUBE • SEAL GUARD. -TORQUE TURN VAM TOP CONNECTIONS TO OPTIMUM 4,400 FT-LBS -FILL SHOE TRACK WITH 8.9-PPG OBM AND VERIFY FLOATS HOLDING. 09 CASING N SFAL 09:30 - 10:30 I 1.00 148.00 RUNPRD MD TOTCO NOT OPERATIONAL.NO SURFACE DATA FOR PVT'S,FLOW-LINE%OR HOOK LOAD SENSORS. -HALT OPERATIONS DUE TO SAFETY CRITICAL EQUIPMENT. -OBSERVE WELL AND MONITOR FOR FLOW WHILE TROUBLESHOOTING TOTCO. -CONTACT WTL AND INFORM OF RIG STATUS. -PROCEED WITH OPERATIONS ONCE TOTCO IS OPERATIONAL. 10:30 - 16:00 ! 5.50 CASING P RUNPRD _CONTINUE RIH WITH 4-1/2"LINER PER PROGRAM FROM 148'-2826' -TORQUE TURN VAM-TOP CONNECTIONS TO OPTIMUM 4,400 FT-LBS -RUN TWO OMD CENTRALIZER'S WITH STOP RING IN MIDDLE OF EACH JOINT#1-61 -FILL EACH JOINT ON TRIP IN HOLE,TOP OFF EACH 10 JOINTS. -P/U BAKER FLEX LOCK LINER HANGER,ZXP LINER TOP PACKER ASSEMBLY WITH HRD-E RUNNING TOOL. ;-MIX AND APPLY PAL MIX TO LINER TOP PACKER RESERVOIR. -MW IN 8.9-PPG,MW OUT 8.9-PPG 16:00 - 16:30 0.50 CASING P RUNPRD WHILE WAITING ON PAL MIX TO SET CIRCULATE 107-BBL TOTAL 3-BPM=130-PSI, 6-BPM=250-PSI NO LOSSES OBSERVED DURING CIRCULATION PUW=85K,SOW=85K R/D LINER RUNNING EQUIPMENT Printed 6/18/2012 11:27:55AM North America-ALASKA- BP Page 2 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project: Prudhoe Bay Site: PBZ Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 23:30 7.00 CASING P RUNPRD RIH WITH LINER ON 4"DP AT 90-100 FT-MIN, FROM 2842'-9269' -FILL EVERY 10-STANDS OF DP,CHECK DISPLACEMENT EVERY 5 STANDS. DISPLACEMENT CORRECT -OBTAIN PICK UP AND SLACK OFF WEIGHT EVERY 10-STANDS **22:30 HRS UNANNOUNCED KICK WHILE TRIPPING DRILL(D1),INITIATED BY WSL BY FLUCTUATION OF FLOW%INCREASE.DRILL WITNESSED WSL R.DOLFI,WSL J. THOMPSON AND TOUR-PUSHER H. GOUCHENAUER. CREW MEMBERS RESPONDED EFFICIENTLY AND AS PER BP PROCEDURE,STANDING ORDERS TO DRILLER EXECUTED. -HOLD MR WITH TEAM,DISCUSS UPCOMING EVENTS IN REGARDS TO ENTERING OPENHOLE. 23:30 00:00 0.50 CASING P ' RUNPRD 'CIRCULATE 7"LINER VOLUME PRIOR TO ENTERING OPEN HOLE AT 9312' -STAGE PUMP RATE INCREMENTALLY 2-BPM=270-PSI,3-BPM=380-PSI,4-BPM= 510-PSI,5-BPM=780-PSI,6-BPM=1050-PSI 6-BPM=14%FLOW RETURN PUW=180K,SOW=155K 5/27/2012 00:00 - 00:30 0.50 CASING P i RUNPRD PRIOR TO ENTERING OPEN HOLE AT 9312' -MONITOR WELL 10-MINUTES,WELL STATIC -MW IN 8.9-PPG,MW OUT 8.9-PPG 00:30 - 03:00 2.50 CASING P RUNPRD RUN IN OPEN HOLE FROM 9312'-11958'WITH _4-1/2"LINER ON DP AT 90-100 FT-MIN. -FILL EVERY 10-STANDS OF DP,CHECK DISPLACEMENT EVERY 5 STANDS. DISPLACEMENT CORRECT -OBTAIN PICK UP AND SLACK OFF WEIGHT EVERY 10-STANDS 03:00 - 03:30 0.50 CASING C RUNPRD P/U BAKER TOP DRIVE CEMENT HEAD,R/U CEMENT HOSE AND LINE -TAG BOTTOM AT 11955'AND CONFIRM DEPTH. 03:30 - 12:30 9.00 CASING C RUNPRD CIRCULATE AND CONDITION MUD STAGE UP PUMPS TO 5-BPM,1270-PSI RECIPROCATE DP PUW=200K,SOW= 180K -PJSM,STAGE AND PREPARE TO CEMENT LINER 12:30 - 13:30 1.00 CEMT C RUNPRD RU SLB LINES AND TEST W/CHART 250 PSI LOW AND 4500 PSI HIGH. Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 3 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:30 - 15:30 2.00 CEMT C RUNPRD CEMENT 4-1/2"PRODUCTION LINER W/SLB -PUMP 35 BBL DEEPCLEAN SPACER W/RIG PUMPS AT 3.0 BPM AT 500 PSI. -SWAP OVER TO SLB AND PUMP 25 BBL MUD PUSH AT 3.7 BPM AND 500 PSI. -PUMP 70.4 BBLS(256 SKS)CLASS G W/ GASBLOK AT 15.8 PPG W/YIELD=1.54 FT3/SK. -DROP DRILL PIPE WIPER DART W/ INDICATION LEAVING HEAD AND FOLLOW WITH 76.2 BBL 9.2 PPG PERF PILL AT 5.0 BPM AND 140 PSI, RECIPROCATING PIPE. -STOP RECIPROCATION AND LATCH LINER WIPER PLUG AT 91.5 BBL WITH PRESSURE TO 2400 PSI. -STOP DISPLACEMENT AT 135.9 BBL, DID NOT BUMP PLUG. FINAL PUMPING PRESSURE=1320 PSI AT 2.0 BPM. -BLEED OFF AND CHECK FLOATS-OK. -CIP AT 15:20 5/27/2012. FULL RETURNS THROUGHOUT JOB. 15:30 - 16:00 0.50 CEMT C RUNPRD SET LINER PACKER -SO TO 100K TO VERIFY HANGER SET. -EMERGENCY RELEASE FROM HANGER. WITH TORQUE LIMIT SET AT 4, SO TO 100K 'AND PU TO 175K AND WORK LH TORQUE DOWN. WORK RH TORQUE BACK INTO STRING, PU TO 190K(-6 FT)AND LOSE 25K. SO AND SEE SHEAR AT 130K AND CONTINUE TO SO TO 115K. PU AGAIN AND SO WHILE ROTATING TO CONFIRM WEIGHT LINER TOP PACKER IS SET. PRESSURE UP STRING TO 540 PSI PICK UP 10'AND SEE PRESSURE DROP. IMMEDIATELY ESTABLISH CIRCULATION 10 FT ABOVE LINER TOP. 16:00 - 17:30 1.50 CEMT P RUNPRD CIRCULATE AT 11.0 BPM AND 3800 PSI. DUMP CONTAMINATED MUD AT BOTTOMS UP. DEEPCLEAN AND MUD PUSH BACK ON APPROXIMATE GAUGE HOLE STROKES. NO CEMENT RETURNED AT SURFACE. 117:30 - 18:00 0.50 CEMT P RUNPRD LD CEMENT HEAD AND 2 JTS DP. 18:00 - 22:00 4.00 CEMT P RUNPRD CIRCULATE AT 12.0 BPM AT 3900 PSI. PU 180K AND SO 157K. -CLEANING PITS FOR UPCOMING DISPLACEMENT. 22:00 - 00:00 l 2.00 CEMT P RUNPRD PJSM I-SLIP AND CUT DRILLING LINE. -CONTINUE TO PREPARE PITS FOR DISPLACEMENT TO SEA WATER. -SERVICE INSPECT TD,BLOCKS AND DRWKS. 5/28/2012 00:00 - 01:00 1.00 CEMT P RUNPRD CONTINUE BUILDING SPACER FOR DISPLACEMENT. 01:00 - 03:30 2.50 CEMT P RUNPRD :PUMP A 80 BBL DEEPCLEAN SWEEP FOLLOWED BY 8.4 PPG SEAWATER 03:30 - 07:30 4.00 CEMT P RUNPRD FLOW CHECK THE WELL FOR 10 MIN AND CONFIRM NO FLOW. BLOW DOWN THE TOP DRIVE AND PULL OUT OF HOLE FROM 9117' to 2849'. 07:30 - 10:30 3.00 CEMT P RUNPRD PJSM AND TRIP OUT OF HOLE/LAY DOWN EXCESS 4"DP TO SHED. Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 4 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project:Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To I Hrs j Task ' Code I NPT NPT Depth Phase Description of Operations (hr) I (ft) 10:30 - 11:30 1.00 I CEMT P RUNPRD LAYDOWN LINER RUNNING TOOL. -FOUND BOTH DP DART AND LINER WIPER PLUG IN LINER RUNNING TOOL. 11:30 - 13:00 1.50 BOPSUR P RUNPRD RU BOP STACK WASHER AND CLEAN RIG FLOOR. -WASH/FLUSH BOP STACK WITH 15 BPM AND 110 PSI. -CYCLE RAMS AND FLUSH STACK. -LD 2 JTS 4"DP AND RD STACK WASHER. 13:00 - 13:30 0.50 BOPSUR P RUNPRD DRAIN STACK AND PULL WEAR BUSHING. 13:30 - 23:30 10.00 BOPSUR P RUNPRD PJSM, RU AND TEST BOPE -TEST BOPE: 250 PSI LOW AND 4000 PSI HIGH FOR 5 MINUTES. -TEST ANNULAR: 25�PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES. -LOWER VBR'S WERE TESTED WITH BOTH 2-7/8"DP AND 4-1/2"CASING. '-UPPER VBR'S WERE TESTED WITH BOTH 4" DP AND 4-1/2"CASING. -ANNULAR PREVENTER WAS TESTED WITH 2-7/8"TEST JOINT. -ALL TESTING DONE IN ACCORDANCE TO ADWOP AND AOGCC TESTING PROCEDURES. -AOGCC STATE INSPECTOR,JEFF JONES ON LOCATION TO WITNESS TESTING. 23:30 - 00:00 0.50 BOPSUR P RUNPRD RD TEST EQUIPMENT -PULL TEST PLUG AND INSTALL WEAR BUSHING. 5/29/2012 00:00 - 00:30 0.50 BOPSUR P RUNPRD LUBRICATE RIG. 00:30 - 01:30 1.00 BOPSUR P RUNPRD LAY DOWN WEAR RING RUNNING TOOL AND CONDUCT DERRICK INSPECTION.BREAK APART SCUD LAUNCHER AND 3-1/2"AND 2-7/8"FOSV AND DART VALVES. 01:30 - 04:00 2.50 CEMT X DFAL RUNPRD MOBILIZE BAKER TOOLS AND DOUBLE STACK TONGS TO THE RIG FLOOR,AND MAKE UP SAFETY JOINT. 04:00 - 06:30 2.50 CEMT X DFAL RUNPRD PJSM WITH ALL HANDS ON MAKING UP BHA WITH STACK TONGS AND NON-SHEARABLES ACROSS THE STACK.MAKE UP CLEAN OUT BHA. 06:30 - 08:30 2.00 CEMT N RREP RUNPRD REPAIR HYDRAULIC LINE ON PIPE SKATE 08:30 - 12:30 4.00 CEMT X DFAL RUNPRD PICK UP 2 7/8 PAC PIPE 12:30 - 13:00 , 0.50 CEMT P RUNPRD SERVICE TOP DRIVE AND DRAWWORKS 13:00 - 16:30 3.50 CEMT X i DFAL RUNPRD CONTINUE TO RUN IN HOLE IN FROM 2976' TO 9127' 16:30 - 18:30 2.00 CEMT X DEAL RUNPRD CIRCULATE AND SPOT A HI VIS PILL AT TOP OF LINER -2.5 BPM,710 PSI 18:30 - 22:00 3.50 CEMT X DFAL RUNPRD RUN IN HOLE FROM 9127'TO 11597'TAG CEMENT _ 22:00 - 23:30 1.50 CEMT X DFAL RUNPRD WASH DOWN WITH 8.9 PPG MOBM FROM 11597'TO 11846' -2.5 BPM,1600 PSI 23:30 - 00:00 0.50 CEMT X DFAL RUNPRD CIRCULATE LINER VOLUME,OPEN WELL COMMANDER. DISPLACE WELL WITH 8.9 PPG MOBM -6 BPM,900 PSI Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 5 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release: 6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 5/30/2012 00:00 - 01:00 1.00 CEMT X DFAL RUNPRD CONDITION MUD AND CIRCULATE 8.9 PPG MOBM. '-PUW 200K,SOW 162 -5.7 BPM,980 PSI 01:00 - 02:00 1.00 CEMT X DFAL RUNPRD STAND ONE STAND OF DRILL PIPE BACK AND DROP CLOSING BALL FOR WELL COMMANDER.PUMP DOWN AT 2 BPM 270 PSI.SEE THE BALL LATCH UP AND CLOSE WELL COMMANDER WITH 2300 PSI. 02:00 - 05:00 3.00 CEMT X DFAL RUNPRD FLOW CHECK THE WELL FOR 10 MIN AND CONFIRM NO FLOW. PULL OUT OF HOLE FROM 11808'TO 9054'.SCREWING INTO EVERY STAND.CLEANING PITS FOR UPCOMING DISPLACEMENT. 05:00 - 06:30 1.50 CEMT X DFAL RUNPRD RIG UP AND PRESSURE TEST LINER TO 250 PSI LOW ATTEMPT 40p0 PSI HIGH PRFSSI IRE BROKE OVER AT 2500 PSI HELD FOR 10 MINUTES BLEED DOWN TO 1740 PSI, FAILING TEST 06:30 - 07:30 1.00 CEMT X DFAL RUNPRD RUN IN HOLE FROM 9054'TO 9434' 07:30 - 13:00 5.50 CEMT X DFAL RUNPRD WASH DOWN FROM 9434'TO 11428' STARTED TAKING WEIGHT -CONTINUE TO WASH DOWN TAKING WEIGHT EVERY 30'TO 11597' -REAM DOWN FROM 11597 TO 11846' -PUW 200K,SOW 160K,RTW 180K, RPM 50 -2.5 BPM,1530 PSI 13:00 - 17:30 4.50 CEMT X DFAL RUNPRD DISPLACE WELL TO 8.5 PPG SEAWATER 17:30 - 19:30 2.00 CEMT X DFAL ' RUNPRD SPOT PERF PILL IN LINER -2.5 BPM,1030 PSI 19:30 - 21:30 2.00 CEMT X DFAL RUNPRD MONITOR WELL,PULL OUT OF HOLE FROM 11846'TO 9054' 21:30 - 22:30 ' 1.00 CEMT ' X DFAL RUNPRD PJSM,RIG UP AND TEST LINER TO 2500 PSI HOLD FOR 5 MINUTES,PRESSURE BLEED TQ 2000 PSI '22:30 - 00:00 1.50 CEMT X DFAL RUNPRD MONITOR WELL,PUMP DRY JOB,PULL OUT OF HOLE FROM 9054'TO 6015' 5/31/2012 00:00 - 02:00 2.00 CEMT ' X DFAL RUNPRD CONTINUE TO PULL OUT OF HOLE FROM '6015'TO 2932' 02:00 - 08:30 6.50 CEMT X DFAL RUNPRD RACK BACK 17 STANDS OF 2 7/8 PAC,LAY DOWN REMAINING PAC PIPE 31 JOINTS AND _ CLEAN OUT BHA 08:30 - 09:30 1.00 CEMT X DFAL RUNPRD CLEAN AND CLEAR FLOOR 09:30 - 13:00 3.50 CEMT P RUNPRD PJSM WITH ALL PERSONNEL,SPOT E-LINE UNIT AND RIG UP 13:00 - 18:00 5.00 EVAL P RUNPRD RUN IN HOLE WITH E-LINE SCMT/GR/CCLTO '9260'LOG UP IN THE 7"CASING RUN 18:00 - 00:00 6.00 EVAL X DFAL RUNPRD RUN IN HOLE TO 11840'LOG UP IN THE 4.5" LINER, PULL OUT OF HOLE WITH E-LINE. 'ADEQUATE ZONAL ISOLATION BETWEEN THE KUPARUK AND IVISHAK. 6/1/2012 00:00 - 02:00 2.00 CEMT P RUNPRD PJSM,RIG DOWN E-LINE EQUIPMENT 02:00 - 03:00 1.00 CEMT X DFAL RUNPRD PICK UP 4.5"RTTS -WHILE MAKING UP CROSSOVER TO RTTS GALLED THREADS ON RTTS AND CROSSOVER DUE TO BAD GAUGE ON 'TONGS Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 6 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:COM-ONSHORE(CON) Start Date:5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project: Prudhoe Bay Site:PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date I From-To II Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) ! (ft) '03:00 - 03:30 0.50 CEMT X DFAL RUNPRD ,LAY DOWN STACK TONGS -RIG UP TO SINGLE IN 4"DRILL PIPE 03:30 - 05:30 2.00 CEMT X DFAL RUNPRD RUN IN HOLE WITH 4"DRILL PIPE TO 1709' 05:30 06:30 1.00 CEMT X DFAL RUNPRD - PULL OUT OF HOLE FROM 1709' 06:30 - 07:00 0.50 CEMT X DFAL RUNPRD PJSM ON CUTTING DRILLING LINE 07:00 - 08:30 1.50 CEMT X DFAL RUNPRD CUT 59.5 FEET OF DRILLING LINE -SERVICE TOP DRIVE,BLOCKS AND CROWN 08:30 - 09:00 0.50 CEMT X DFAL RUNPRD CHANGE OUT 4"ELEVATORS TO 2-7/8"AND RIG UP DOUBLE STACK TONGS 09:00 - 10:00 1.00 CEMT X DFAL RUNPRD PICK UP 1 STAND OF 2-7/8" -MAKE UP 4.5 RTTS -CHANGE OUT DOUBLE STACK TONGS TO BE ABLE TO MAKE UP 2-7/8"X 4"XT-39 CROSSOVER 10:00 - 15:30 5.50 CEMT n X DFAL RUNPRD CONTINUE RUNNING IN THE HOLE FROM 127' 'TO 9217'WITH 4"DRILL PIPE 15:30 - 16:00 0.50 CEMT X DFAL RUNPRD SET RTTS AT 9235' -PUW=186K,SOW=167K 16:00 - 17:30 1.50 CEMT X DFAL RUNPRD TEST LINER TOP PACKER -250 PSI LOW FOR FIVE MINUTES -4000 PSI HIGH FOR 30 MIN -LOST 30 PSI FIRST 15 MIN,0 PSI SECOND 15 MIN . RUNPRD 17:30 - 21:00 3.50 CEMT X DFAL DROP OPENING BALL AND OPEN WELL COMMANDER -OPENED AT 2200 PSI -DROP ISOLATION BALL AND CBU WITH A HIGH VIS SWEEP,GPM=600, PSI=2200 -DROP CLOSING BALL AND CLOSE WELL COMMANDER.CLOSED AT 2350 PSI. 21:00 - 22:30 1.50 CEMT X DFAL RUNPRD FLOW CHECK -PULL OUT OF HOLE FROM 9235'TO 6581',7" LINER LAP. 22:30 - 23:30 1.00 CEMT X DFAL RUNPRD DROP BALL AND OPEN WELL COMMANDER AT 2200 PSI. -CBU CLEANING LINER LAP,GPM=600, PSI=950. -DROP CLOSING BALL AND CLOSE WELL COMMANDER AT 2150 PSI. 23:30 - 00:00 0.50 CEMT X DFAL RUNPRD MONITOR WELL TEN MINUTES AND CONTINUE TO POOH FROM 6581'TO 5800' 6/2/2012 00:00 - 02:30 2.50 CEMT X DFAL RUNPRD PULL OUT OF HOLE FROM 5800'TO 1803' 02:30 - 04:30 2.00 CEMT X DFAL RUNPRD PULL OUT OF HOLE LAYING DOWN DRILL PIPE -1803'TO SURFACE 04:30 - 07:30 3.00 PERFOB C OTHCMP LOAD PERF GUNS IN SHED,MOBILIZE HANDLING TOOLS TO FLOOR 07:30 - 13:30 6.00— PERFOB C OTHCMP MAKE UP PERF GUNS AND 2 7/8 PAC PIPE AND RIH TO 3007' 13:30 - 18:30 5.00 PERFOB C OTHCMP RUN IN HOLE WITH GUNS FROM 3007'TO 11755'TAG UP ON TOP OF 4.5"LINER 18:30 - 19:30 1.00 PERFOB C OTHCMP PLACE GUNS ON DEPTH -BOTTOM SHOT AT 11,680'TOP SHOT AT 9556' -PJSM, FIRE GUNS AS PER TCP SPECIALIST, GOOD INDICATION OF GUNS FIRING -WELL TOOK 5 BBLS INITIALLY THEN STATIC 19:30 - 21:00 1.50 PERFOB C OTHCMP PULL OUT OF HOLE FROM 11,680'TO 9556' Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 7 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C:(3,835,319.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 I Spud Date!Time: Rig Release: 6/6/2012 Rig Contractor:DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT 1 NPT Depth Phase Description of Operations (hr) (ft) - 21:00 - 22:00 1.00 PERFOB C OTHCMP MONITOR WELL 10 MINUTES,WELL STATIC -CIRCULATE BOTTOMS UP 500 GPM,2000 PSI -MONITOR WELL 10 MINUTES,WELL STATIC 22:00 - 00:00 2.00 PERFOB C OTHCMP PULL OUT OF HOLE LAYING DOWN DRILL PIPE FROM 9556'TO 7322' 6/3/2012 00:00 - 04:00 4.00 PERFOB C OTHCMP CONTINUE TO PULL OUT OF HOLE LAYING DOWN DRILL PIPE FROM 7322'TO 2649' 04:00 - 05:00 1.00 PERFOB C OTHCMP RUN IN HOLE WITH STANDS FROM DERRICK FROM 2649'TO 4793' 05:00 - 06:30 1.50 PERFOB j C OTHCMP PULL OUT OF HOLE LAYING DOWN DRILL PIPE FROM 4793'TO 2649' 06:30 - 08:30 2.00 PERFOB C OTHCMP PJSM WITH ALL PERSONNEL,RIG UP TO LAY DOWN N 2 7/8 PAC PIPE AND GUNS 08:30 - 15:00 6.50 PERFOB C OTHCMP LAY DOWN 2 7/8 PAC AND GUNS FROM 2649' TO SURFACE 15:00 - 19:00 4.00 BOPSUR P RUNCMP PERFORM WEEKLY FUNCTION TEST OF BOPE -RIG UP TO RUN 4.5"COMPLETION -PULL WEAR RING,MAKE DUMMY RUN WITH HANGER 19:00 - 00:00 5.00 RUNCOM P RUNCMP RUN IN HOLE WITH 4.5"VAM TOP 12.6#13CF3 TUBING FROM SURFACE TO 348Q',AVERAGE MAKE UP TORQUE 4440 FT/LBS 6/4/2012 00:00 - 08:00 8.00 RUNCOM P RUNCMP CONTINUE TO RUN IN HOLE WITH 4.5"VAM TOP 12.6#13CR TUBING FROM 3488'-6581'. STACKED UP 4K AT 7"LINER TOP.TRY TO WORK THROUGH 3 TIMES WITH NO SUCCESS.PICK UP AND ROTATE STRING 1/4 TURN AND SLIDE PAST 7"LINER.AVERAGE MAKE UP TORQUE 4440 FT/LBS.PUW 120K, SOW 115K.CONTINUE TO RUN IN THE HOLE AND TAG UP WITH THE WLEG IN THE BOTTOM OF THE TIE BACK RECEPTICAL AT 9143'. 08:00 - 10:00 2.00 RUNCOM P RUNCMP PICK UP AND SPACE OUT WITH A 5.85'PUP JOINT AND LAND THE 4.5"VAMTOP 13CR-80 COMPLETION TUBING AT 9137'. -PUW 152K,SOW 139K 10:00 - 10:30 0.50 RUNCOM P RUNCMP RUN IN THE LOCK DOWN SCREWS. 10:30 - 11:00 0.50 RUNCOM P RUNCMP PJSM FOR 9.2 PPG BRINE DISPLACEMENT. 11:00 - 14:00 3.00 RUNCOM P RUNCMP 1 PUMP 280 BBLS OF 120 DEGREE 9.2 PPG BRINE FOLLOWED 240 BBLS OF CORROSION INHIBITED 9.2 PPG BRINE,FOLLOWDED BY 165 BBLS OF 9.2 PPG DOWN THE IA AT 4 BPM 380 PSI.PUMP 5 BBLS BACK DOWN THE TUBING TO WASH OFF THE RHC PROFILE. CLEAN AND CLEAR THE RIG FLOOR. Printed 6/18/2012 11:27:55AM North America -ALASKA- BP Page 8 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type:COM-ONSHORE(CON) Start Date: 5/28/2012 End Date: X3-011 RK-C: (3,835,319.00) Project:Prudhoe Bay Site:PB Z Pad Rig Name/No.: DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:00 - 17:00 3.00 RUNCOM P RUNCMP DROP BALL AND ROD, SET THE PACKER AND TEST THE TUBING TO 250 PSI LOW FOR 5 MIN AND 4000 PSI HIGH FOR 30 MIN. -LOST 80 PSI IN THE FIRST 15 MIN AND 20 PSI IN THE SECOND 15 MIN BLEED TUBING PRESSURE TO 2000 PSI AND PRESSURE TEST THE IA TO 250 PSI LOW FOR 5 MIN AND 4000 PSI HIGH FOR 30 MIN. -LOST 60 PSI IN THE FIRST 15 MIN AND 20 PSI IN THE SECOND 15 MIN BLEED TUBING PRESSURE DOWN 0.WAIT ON APPROVAL. PRESSURE UP TO 1500 PSI AND PRESSURE UP TO 3500 PSI ON THE IA. BLEED PRESSURE OFF TUBING PRESSURE AND SHEAR DCK.VALVE SHEARED AT 2400 PSI. CIRCULATE BOTH WAYS AND CONFIRM DCK IS SHEARED. 17:00 - 19:30 2.50 WHSUR P •WHDTRE DRAIN STACK AND INSTALL TWC.TEST TWC . FROM ABOVE TO 250 PSI LOW FOR 5 MIN 'AND 3500 PSI HIGH FOR 5 MIN.GOOD TEST. TEST TWC FROM BELOW TO 250 PSI LOW • FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN. -LOST 0 PSI IN FIRST 15 MIN AND 0 PSI IN SECOND 15 MIN. -TUBING BARRIERS ARE A TESTED TWC AND A BALL AND ROD SEATED IN THE RHC PROFILE WITH KWF ABOVE. -IA BARRIERS ARE TESTED COMPLETION PACKER, BALL AND ROD SEATED IN THE RHC PROFILE WITH KWF ABOVE,ANNULUS VALVE,AND TESTED 9-5/8"CASING PACKOFF. 19:30 - 00:00 4.50 WHSUR P WHDTRE FLUSH STACK AND NIPPLE DOWN BELL NIPPLE.SLIP AND CUT DRILLING LINE AND CHANGE SAVER SUB WHILE WORKING ON NIPPLE DOWN BOP. 6/5/2012 00:00 - 06:00 6.00 WHSUB P WHDTRE NIPPLE DOWN BOP, NIPPLE UP ADAPTER FLANGE AND TREE,TEST VOID TO 250 PSI 5 MIN,5000 PSI 10 MIN AS PER PROGRAM. 06:00 - 08:00 2.00 WHSUB P WHDTRE TEST TREE 250 PSI LOW,5000 PSI HIGH -GOOD TEST 08:00 - 10:30 2.50 WHSUB P WHDTRE RIG UP DSM LUBRICATOR AND TEST -250 PSI LOW,3500 PSI HIGH 5 MINUTES EACH -PULL TWC 10:30 - 12:30 2.00 WHSUB P WHDTRE PSJM WITH LITTLE RED,TEST LINES TO 4200 PSI 12:30 - 15:30 3.00 WHSUB P WHDTRE FREEZE PROTECT WELL WITH 140 BBLS OF DIESEL AND U-TUBE • -2 BPM,1650 PSI 15:30 - 17:30 2.00 WHSUB P WHDTRE RIG UP DSM LUBRICATOR AND TEST -250 PSI LOW,3500 PSI HIGH 5 MINUTES EACH -INSTALL BPV 17:30 - 18:30 1.00 WHSUB P WHDTRE TEST BPV -250 PSI LOW FOR 5 MINUTES -3500 PSI HIGH FOR 30 MINUTES -GOOD TEST Printed 6/18/2012 11:27:55AM North America-ALASKA- BP Page 9 of 9 Operation Summary Report Common Well Name:Z-06 AFE No Event Type: COM-ONSHORE(CON) Start Date:5/28/2012 End Date: X3-011 RK-C:(3,835,319.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.:DOYON 14 Spud Date/Time: Rig Release:6/6/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum:Z-06A actual @88.72ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 00:00 5.50 WHSUB P WHDTRE RIG DOWN LITTLE RED,SECURE TREE, INSTALL VALVES AND GUAGES,SKID RIG • FLOOR RELEASE RIG FROM WELL Z-06A AT 00:00 06/06/2012 Printed 6/18/2012 11:27:55AM Z-06A, Well History (Post Rig Sidetrack) Date Summary 06/14/12 PULL BALL& ROD FROM RHC PLUG BODY @ 9125' MD. 06/16/12 Slickline, E-Line And Ct Tags [TAG]-CTU 8 CTV=32.7 SCOPE; VENTURI/DRIFT LOG/SET CIBP.. RIG UP. FUNCTION TEST BOPS. RIH W/BHA;2.875" CTC, DFCV, 3.125" DUAL JARS,2.875" DISCO, 3.01" CROSSOVER, 3.12" CROSSOVER, 3.125"VENTURI, 3. 06/17/12 CTU 8 CTV=32.7 Scope;Venturi/Drift& Log/Set CIBP. Continue RIH w/BHA; 2.875"ctc, dfcv, 3.125" dual jars, 2.875" disco, 3.01"crossover, 3.12"crossover, 3.125"venturi, 3.45" shoe. (oal=22.26').Tag PBTD @ 11846 CMD, 11842' up wt. repeat several times..(166' of rathole) Pooh.Junk basket full of cement with metal pieces. Empty Venturi barrel and clean filter, rerun Venturi. Dry tag @ 11848'. Work venturi to 11849'. POOH, BD BHA .(Recovered very small amount of metal) Cut 150' of pipe. MU and RIH w/BHA=2.875" MHA, 2.875" disco(7/8" ball), 3.01" xo, 3.085"xo,2.875" logging carrier, 2.21"xo, 3.7" nozzle. (OAL= 15.43')Tag btm @ D-11,856 Up- 11852.. PUH flag pipe 20' up from up wt depth. Log 40 fpm.At 9920 BHA started dragging debris pulling 6-7k over. stop and RBIH.swapped from CTBS to coil and cont. PUH at 40 fpm. stopped at top of interval. RBIH @ 80 fpm to repeat drift. ran down to flag without any problems. Start pooh.. 06/18/12 CTU 8 ctv=32.4 Scope; Log/Set CIBP. Pooh w/BHA=2.875" MHA, 2.875" disco (7/8" ball), 3.01"xo, 3.085"xo, 2.875" logging carrier,2.21" xo, 3.7" nozzle. OAL= 15.43' (Held Emergency Fire Drill) Log indicates total depth = 11,856'with -2'correction. RIH w/BHA;2.875"ctc,dfcv,disco, 3.625"setting tool, 3.562" setting sleeve, 3.562" CIBP (oal= 12.8') Ball on seat. Pressure up to 2050 psi,set 4-1/2" Weatherford, 10K pressure rated CIBP,top of plug @ 11,848.5'. POOH. FP to 2500'. Pop off, BD BHA, retrieved 5/8" ball. Cut 150' of pipe. Chain inspection, change packoffs. RDMO. Page 1 of 1 9 c HER N� r f m 0 n N FRE r O b N O C (V b rn m T T W Omi Ob1 m O <� �� <� n r � d a m N `e rn J N a a a a a a a a a a Y V Y a d Y d $ a V0000 `�ao�c ffi `g mom O dam^ mnH mN J N r � nnrrn nn nn O N N N N N N N N N N N N N N N N N r n n n n n r n n n r r n r n r r n r r r r r r r r r r r r r r r n r r n n n Q N ay b m oo r $8.FI ave n Nr N Nr 7, "z o mo aaagE vgEaa vaaaa aaw" www* 4En W 11 C Nno �mO b f Om.000 0 000 2 i HA Hill MB Hill iMMii ilii 0 J Z^ m O b p O 0 0000 00000 0 0 0 0 0 O 0 0 0 00000 EEE 0 00000 ,M;'1,9 LE. a A ,,E ,S! 8:68'4 0mooao nv m`ru" 71;00 "off Smrvmry C C Q C j 0 0 0 0 0 0 C 4 0 0 , O O 9 ry 4 t Q m 2 C O N g ' 's- 8 ,88. :282P4; o m m o 00 0000 00000 0099qqoo m-n-.-NN NNn'� 0 1 Q O 0 d f w w p N E M28b M bo mm mO < (aD 717.0 g- 66666 00000 0 000 0000 , NN NN.-.- 0 m 0 (i6§121 N a N 0 b '-'-'7' 0 En'r Z,N b°' rNZob2 U o mam .5Um = y iNoarobNbm2m4N3 a =t o umi,'$,'r, !!:-3'3F Damn mon%nm a ryam v0i�i,m d Q O 0000 00000 F NNNN ,f 0000 ,llbbb a,m"nvf tea,' N y t V O ` o .. d ;i G. GL 2 O H L C d .. E 7.Y c f x°01 4 „ � co > o a O 0 W. 2 . . a c u c 2 T, W t 0 g ^ n m0>. b m o m m b'0 - C 0 u N o.O o E E' > O o 0 , , , 66666 66666 O , , V m N a a a,n n H O 3 j. O N 0 u d O C O O« t `G 'O N d a N,a a l m LL Y y O D U U 2 m2'c'c o>o m `e,3 °e,';, `e,r,v_ ^" a CO y b» W 2 F 2 0 2 2 f7 '123 C Q e a- o , u� v2 imp mp Y�Abp m�L,s,— b V1 b b t Np V V V V n V V V Op g�t �Mp M O N VNi m 21°4 LL^ Mmmm gag ammmm mmm >. mmmmm mmmm mmmmm 0i0 M F V 71 L4 V.TN N N 0>0(0 N NNN 7, N M M N 0 Q Q N Z O O O N O :14'4'4 o mmm n r m O c N 9 .2N WEEP REIFF, uEEp. sEIII au mum MMM4,M b N b H O O N m , n n a i 0 O V �Nm E nN N� N �N.-NN .hn � ���� NNNNN ERM u a l a a < 0 El“ r a 3 w «'mb m Q- vi iN M- m 0 0 00 0 000 0 -C o O O O O 00000 0 0 0 0 O 00000 O 0 0 o N b yon N N N ,1,i . .-_,F=.1. 2g,22 F4:-isiiE ,W v Q b,Qo N a N m °0 N o a O QQ �m d N N N N�g N 2 2 Z o 0 2E8 a Pmmm mmmmm mmmmm mmmmm mmmmrymry M mmmmm mmmmm mmOmamm�OO .. E '-N "0" m F-.� V:I to V.TNNN nAK4 Nni 7, MN%3A e .w, c O T 1 a.. N .1.1 W i W N 1.- .t.,2143 L. U m E r G rc n'C U b J U C E 4 2 0 S m 9 a O O Hdir y o a d`9 0 0 t7 in E c = p u Z Z s n m m a E _ K O l N 3 m Q N N F O J J U C9 U _ YJC p0n0 8m^ dti ^NMXO ioedP R On48888m PO,E„N Ea0 r ^mN g^ 1. .'1 FAM O4NN2 pAI�mm S2OOH �mN7NN AnM1 44NNNm„mNNmNNo b bNammmNN NppNN NRNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNNN NNNNN NNNNN NNNNN NNNNN =mama, mmmmm mmmmm mamma. m mm mamma, mamma, mamma mamma m m m m m m m m m m m m m m mN m N_ N 2r11432 NN^dN al+I N NNN N m f d O dom N Nm A♦♦N ^MNN 2 d O 0 N d m O D 2 m m eN mN N X4§24 EmN O^NO �1 m ^ N g 4r�w2 nw�NM MNNMNn^mF mEmrvOmrnE M NANnN nnnnn Hill snnss m NNNNN NNNNN NNNNN q ggggg ^0000 ggggggOA0g gOggg gggAA Agpgg AAAAA ggggA ggggg gpggg A AAA A ^G O C mmmmmy V 4m43'42^ m2 V nm4NN 2p227,22 ,q,7- ,8474, -�2h2mm2�2 P228,1; 2]N 8m22 f0 W 42 m Oee-m gz^ IIEd 'Nm AEINnn OEM Mp OVWA '4nN0 mryAOn mwgO 36m6h ELM WENN Nmmm m6NNN nNN 6m6Dm 6mNmo NNNNN VFmmN al8 lNO!) N NNN N N N LCC?•••ONAo'm NOmi AVO^, b A N O N 28,72q mrOV N 2 M m N mOm' O a,d7, NOmON7,2,°'2F-2 W m O6mm 8c7,224m4 Nm;m0 NNNNO AMA MEE V1V NWRN ^NNOMNON CNNEmN< mmUNERE-27. 2 22222 22222 ' ' - mm.mm mN ENE.„- .0n'nUAm NNNNN 22222 NNNNN NNNNN NNNNN 6mmmN NEsNm NNNNN 2U22 22222 22221 222 . S. MP!!!rD1 !!! 9Eno 0�16`1a�'1^m1 00000 ryory!wmi! 'mem°o' nga�inr nm000 Ma I!! !Inn a-No`m, <a^omoN $m �N�000 �000 0000 0000 OOOO� O'IO wln ndwl OO aV wi OCO wI X000 X00�O 0000 00 O♦WE D m w l O m NmN mIgm O I N m.9-m v m m m O1 m3 n d0'L1 N 0 tE132. 12. 2A;7,22 Y NI 2 m ynNUO2292 9E-4 4 Na ^N NN p d NRv ""2 "m e53g "2"" ;HIP " ;HIP 5 $Nd1 PAM NONN NmNmN mldE 11 Z K001z a^7,O m^NP W h2:NNm ro ON MS f gaNV 2 W Nm RM2 :a::;: , �, � �;1200- WryNryN NNmmN NmM MMM m4444 44441 ::a::: ♦ R FRMm� MNKN;: y 07,220274'422'4N2 22ON, :mmTNN22OONn<M�: 28222 112824'.7,'2:2,1 AYm ^ NGAWOn m 4m8xx 11 QOaOp aO 0 =tmB ; NN0A0 NMMmS mm� NG;1mp2 g7214N 2�mg- OmMm,1 V;2m,� r.;3 GNNRNi HRH NdNN <e5pm ^^E12 AH ;MU NNm mom m m d^JI Q O C T W_,%g lz,T 4 �pN O3 222,922 �00`7,0 00800 mn m mN 2222E, Zm P 2ry Igng 4m e:=P m 8,1,8pp 2 E4mm 2 42 g dd NR R Erin F2FRAE OREA 1N111NNm mWR mryYmN7, MNNOm mRO1 2 p 77,NN0 mppO0� N�:lreng7,2413 g7,mt2O 0d I4O OrNmn 747,42S . mOOm 12432 Nm vA6am ?4;;V8.2 N dmNA N n m F7 2 M2/7424 pO pdmmT 12 ^ m dNrNANNOmg ^ 2g rN %A24.7 44244 24842 48722 8x628 mNNOm 00022 32228 Nmgn)A nOnn 12WWmmma�m 12 p E222 Ngr-7,4P pp, atm1g 2NONO mm g 2O N4amNN NNgMro 27,n N 22228 2 On2N o d22P 4P Nmrym2 ^m � INNER �Rm mVEO31ON E Nm EnNgl' rEn�g a:mmm0 ryD22 ma0 2 L 6 7,^� 4 NmmN �^m m8Omm n 7, m m mm2 2'42274 N d O NN 24e;;12 m em d 242;7,2 47,2g122 yN I- N111 NNNN AMA NNNNmNNNNmNNNNN NNN8N HARE CCN'NIMNNNNN NNNNN CAERE NN C cle N aD 28422 I8 IfIIIOp 1NN 144�2 2488888Za248888022 a^'f 22 28;282 N N N v o Y gii 82222 Iel ImpI222 t7 t02I22IN t7 tIf X e',f7,'I2r7,"A A44 ,4 m d rn d ^mmmm mA^mo A^m -A I n p�`mNmNm mnnm nnrnn 804 W g NamhYm,1 am4q O0N ,'4OYI mNrOa2D an8;66 82 .��nnnAn 88„88 mnnl�nln �INN6N 6 n n f e 11114 !!III! axil m11111m Hill Hill ;UPP PnrImr Mil MEI 4aX'o$ mm v !III! A mm mmmm 0 O N U 3 0 ..............._._.... ic'W"Cli Ew nW EW tn." r Ow W bW mOi Nq0 mW^W :71E4, EW WW pW W mEw iW OW SW 8w EWA W W W NW Owm�'0 MYO ^wO ba ba ma Oa Na Ma ma av �v Nv Wv nf nY Ma fia XBa Wa E w 8nb M Z ♦ OW nal NMEE' Mbm b OrME ms0 MWm0 roE82A mMPNE %mWW SOO 3 .W aaRIaa M"H MqN MFAMM aapa MMNpN NNNNN MEI, NMM PNN7 a V a Y a 5 •^M^O ((VV m 0 mm W 2 8 b N TVV.=.4 P m_ w m'w m 'O b P O V^b N 4 N' O 9�m X A1Mpm O! b tMtDD�� N' m ay m pp ppN�NO NfO bm mlOb�� �mfYO YfO bm mO ON(awpo �NmW = W F,1 A^rrm W EmEM EEE Nw iEXN Ea-EEEE3 RIA 00 m Me g WEE wOOaw'1 wMXEam grog m EE C7 a-AA ^ OOOr-� N N Na�yy NN^ RUM �MN\�MN`n N ging ^^�^N`r^N` m^Wmmm ^w^W nEn EWA qmE &�8 R8NN J $BFB '°$&'8. 1NE^ wwW EWA www N ^wa EEM 1 N N N N NNN N MEM N N NNeN NQ ELMER N N N NNN N N NNN N 1 y N f y N N ry NNN N Was N N N N 1`{1 y N N N N N N N �n r4 inn n gn gn na.AfO-A RPRRE Pn Pn n ggnn n n n r n g nao-Pn R Rn P2P-rb- P Pn gr nn g l0-n nn nb O Wmm m-m '4,72:22 Mts.a NN 2242,9- M m Wr-yy w. 2 Wa-M24 2,7,2t722,7,2t72 0 MNOVM 'N W W h 2n/034 n/04 NONm I4mn MMmwNmmI^ ro nnm NWbN Em^N^ OImFFNNLIV 8^ 8 AYEEg CbM HEE W EW WWwww wwwmb NEM EWEEW wwWWw wWYww 88Ww NNOOO Nl0 WwWww wwwHwlh EWA '22r4! Y W OmN MOmwmgN 8!”,! !”,! mE80 M, NE !28F,! SF,On--nn iZEEE EEEmPaEn nEEE sEEEE EI^ EEEEE Em EEEEE E mmmnmE IEEE i EEE NNN wwEEE wEEEENNNNNwwWWw NNNNN wWwww wEEEE wWWWw wWWwwNNEEE ENm E`nEXw E 114Nm VWb+N 8R2RT RA442 277422222 gT2S2 22EN2 O4EnmnW 82422 OMoN Opnam NNIMa ONNM abOWV WwmnO NMnmO MOa0•- .-MNG v-WMNNN000 Nbbf W XMfIm 2a822 47222 22222 a222^ MVP-M2 M2PaX 2'42,92 aaM2aa- 22MU, 2”1,2 a'1ME 12 EeM 0 M MAR �� �M IG�a- W al N r,!� Mil G ati G 0!�al n Ol al CI IV lV M a Emn MAR <mX� � MA i l io�� s� w HiRA W4 EES 1444 N N N N NNN N N NNN N N N N NNN N N M a I e t a�r;M a7 t?M r7 M e r r r � r r M t 7 7 T Y Y =EE�v� � m m(O OVNO NA Cw^ W♦w 0 NV V pE ::::: ::::: 42 NN1pp AME W RVA ::::: E ::::: i::::: NY2A M2mNY MMyALO �O N m1a2 • E',:iWV ::::: (p 2 8 0 M mm aamap��N n mm a�p�p � �a yy O W w RIM n w N � (m(D am-r`y� ay m�_ ^V 1 V t VtOO I P aa pp N Q YOa <MNNE ♦m�wpU N ao $M8w0 aRf aI'1MM� Mn'M a`I'R aMftM9+Naa'1M �Eawrl awiMrA aMm'lamrlR W I 41,40 a N N N N NNN N N NNN N N NNN N 1^V N m N N N NNN M M M IRRI1 M M M M a OI a n N r ❑ =ZM^aN q'aMNO nptp% 222=2 0 MO �Oa NE♦Bn H4PA mmep2ma abbNMa^ bNmNN ryNNN ARA RIM IOrW nO NEl nni E M7wbMRmR RAE' nGMm Q O pp��pp �p �p a m �p �y p W YaOM ONi 2Ga7 M fOV1gfO1p2 O12g�2�Mp NMz1n ONTNY W rE� N^OoEn f0 W a^o,0�� NIOOfQ 2 nO��E P2M-7�M O^nr AMR HRH aa- M't'�ppE �IpV mO Pp 1001 N En +Iatpl N�mfYpi Nw CMp MCpI CC�VM O�j��pp NE♦Va � �apl �OpD��IV pO Visa AO N N N N NNN N N NNN N N NNN N N NNN N N NNN a l a l ao M M M M a f aNf M M M tMh a I N I aal M M tM7 f a I M M M a^9 M M MMM M aWl V V a L J arEbm ,7,2V4-8 22m24 mRE mmmoP XPwPE Nmrv7,'Mn "EawiEw ranmar°mM 22442 R2zz:E2 24EEV N'e4 S --Em^ OmmmR mm mm mmmWE EEEEE 'WWEE WmEEE WEE HERE M EE §mmmm mmmgm EEEE mmmm C 68X2IV MMNAM G V MOP- 26-2M2 @vvnG ryry E O mm Mt=2 N m aMAw{p MoON W V ONNWaA y ma m E Y mm BN g mEHE m1111 11811 1111E pmn! csN,aNM E.n Xm O 2M E NaNEE a NMNPw do N 2a2 �'$�o O^^ON b, NNW $m mP m �rw m NmNNN N+NRNNNNN NNN NNNNO NNNNN NNNNN NNNNN NNNNmNNNNN N NNN N N N N N C:.6-2N 2422V 2mqq OON 6-3A42 NN168w YNOEB 222;;M MaiTNO an NI2 z V 222 2323; V23; Wa;NNN 22 M; " "8" a"8 88"8 E8" "Wm WEEE 88800 888^ "8" "888 OO 8888? FAA G C W2^m w '2 0 0 0 2222-2 m Y M PM W w b X27:22 W Y a^l,m m 1^S'O m m m m m N N O n w N.2 m M Ma a ry".T=z R Y m OMi11111 M M la0 m w 4 8 8 8 W W W^w Or W E N E W w Ew E 1 I S 0 0 0 O O O O O O XXX O 8 0 8 0 0 O O O O O O O O O O S X O o 8 8 8 N N 0 O O U, N 8 E � E u° 0 mrvm mmm mma Fromm r"o 'C i o ^E m Mon n m iv n I E o E n i $ V m g2g4 N.mnmm� �c4Fm !- J �y M M o m m m m m m m m A m p N N N o N m m m m m • moo." IJ CW eEO'.= nN3A812222 m22 ONNVVOp m28E8tnRI 1 NNNN NNNN nNnnn QfO7 G G G C C G CCG G G C G G G G GAG C o R rnnnn nnnrr nnnnn nn n N N G a g+ 8,72'.-52 V 0 0 N W g H4N n N Oe E mM m1� 22, m '�v rvm _ mN N 41-4 44i44 ^a^ass's aaaa� ��vv a m 22222 22222 22222 222 22 m ap 3,"'•=6 28; 82 n evirno zzs EEEEE EE lmm$m a$ mug woww2E m mmEEEm 2222 m np ^mryEry moirvn" (28882 ANngB o 0.. novi- fm' G�Mnm mo G ,%E2 hOEEr E8n00 228'48 28 V 2 m • f n E E O M U i m p i HMI r O C r0, Er ry YY/Y4 44144 //4Y4 44444 v aQjyQ� a7Qj m N N N N N N N N ;ER ceim.sv am cmmm°V RN2 <e 2 o ma�Q« xoo N in a e 4 a ZZWWW Y O a m n H N N Ra Y R m .28 NNNNN N m a Q WEE �p n0I e2M Vg p 2 W 0000f g♦�N mOm Og E V " fifv yyimfh IEmrN !m O =£EV8%;2 V828,% 2;1;3g818g",-1 EMIR Mf Ofm miw EEnnyip m Soo ZmW 8 1;3E8 822T! momm. r OO _N mm e m ~nO W N m 02aZm ;;;;; I ;;;:; nm1SSgE :;:;; .mp;pp m m m W q W y X mmm 2:12g . 8282';.1 12 N O b m IOV =t-5Fj 5rj mrj N£�iri mri mNn.0 It!!! NNNm ilia U. aaaaaaari mm mm tVV Re W ,988g p 2�Oi pp g%21428 NNt2E2 82 O F eri m E g E g E N V E N N N N N N N N N N N N N N N N N N N N N ..' � {mp N m r ry ON 3�E M E b E 2 2 W m ~Z Q G•- 2:;:;::: :;:;:::; :;;;:; m mNNNN N r. OMa i EE23Um2E2 nip228 oE' G mN Pan m a D q Wir c y U a Changes to Z-06A 7" Cement Job PTD# 212043 Page 1 of 1 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Saturday, May 12, 2012 3:06 PM To: Ciolkosz, Ryan R Subject: Re: Changes to Z-06A 7"Cement Job PTD#212043 Ryan, Thanks for the update on the cementing plan. Good luck with getting it in place. I will update the well plan with the new information . Regards, Guy Sent from my iPhone On May 11, 2012, at 5:17 PM, "Ciolkosz, Ryan R" <Ryan.Ciolkosz4 bp.com>wrote: Guy, due to issues with the Kingak shale we increased the mud weight from the planned 10.3 ppg to 10.8 ppg to help stabilize the wellbore. Because we increased the mud weight we are changing our cement strategy from a single slurry 15.8 Class G to two slurrys with 500' of 15.8 ppg Class G and 11 ppg Litecrete to the Top of the 7" Liner. The new cement plan is as follows: Casing Size 7"26#, L-80 Intermediate Liner Basis: Tail: 80' of shoe track+ 500'Annular volume above shoe with 40% excess Lead: From 500' annular volume above shoe to liner top packer with 40% excess in OH and 200' excess above liner top packer Total Cement Volume: Spacer -35 bbls of Viscosified Spacer weighted to -10.9 ppg (Mud Push II) Lead 82 bbls, 461 cuft, 244 sks 11 ppg lb/gal Class G- 1.89 cuft/sk Tail 19 bbls, 106 cuft, 91 sks 15.8 lb/gal Class G- 1.16 cuft/sk Temp BHST 220° F Ryan Ciolkosz Drilling Engineer BP Exploration Alaska Office: (907)564-5977 Cell: (907)244-4357 5/14/2012 SEAN PARNELL, GOVERNOR �ry �y�+ �Dv III LELED D RAA 333 W 7th AVENUE,SUITE 100 A�1► Ll.® EORT !S!1IDE �l.CID=3OMB" ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-06A BP Exploration (Alaska), Inc. Permit No: 212-043 Surface Location: 974' FNL, 1322' FWL, SEC. 19, T11N, R12E, UM Bottomhole Location: 4135' FSL, 3391' FEL, SEC. 24, T11N, R 11 E, UM Dear Mr. Allen: Enclosed is the approved application for permit to redrill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cyd Cathy P. Foerster Chair DATED this ----, day of March, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA 's �I.�t ___ _� R�.,k,,"L. E �IRf ALAS, JIL AND GAS CONSERVATION COMM ON PERMIT TO DRILL v MAR 2 2 2012 20 AAC 25.005 1a.Type of work: _ 1 b.Proposed Well Class: ❑Development Oil ❑Service-Winj LJ Sin leh;:e lc. Specify if well is proposed for: II If` ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone AIUtGdaltidSas CEll6,aCbtif411i1 01� ❑ Re-Entry 0 Exploratory ®Service-WAG - 0 Service-Disp AnchcPpale Gas lI I 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 14. Wail Neme-and Numhor: BP Exploration(Alaska) Inc. Bond No. 6194193 PBU Z-06A 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11925' , TVD 9010' ' Prudhoe Bay/Prudhoe Bay - 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028262&028245 974'FNL, 1322'FWL, Sec. 19,T11N, R12E, UM Top of Productive Horizon: 8. Land Use Permit. 13. Approximate Spud Date. 3967'FSL, 1117'FEL,Sec.24,T11N, R11 E, UM May 1,2012 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4135'FSL,3391'FEL,Sec.24,T11N, R11 E, UM 2560 1900' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: • 89.42' feet 15.Distance to Nearest Well Open Surface: x- 599046• y-5959100• Zone- ASP4 GL Elevation above MSL: '. feet to Same Pool: 510' 16.Deviated Wells: Kickoff Depth: 6700' feet 17.Maximum Anticipated Pressures in{sig(see 20 AC 25.035) Maximum Hole Angle: 100 degrees Downhole. 3710 - Surface: 2851 • 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 8-1/2" 7" 26# L-80 VamTop 2760' 6550' 5998' 9310' 8659' 488 sx Class'G' 'T 6-1/8" 4-1/2" 12.6# 13Cr85 VamTop 2765' 9160' , 8519' , 11925' 9010' Uncemented Sliding Sleeves ✓ 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 10450' 9177' 9308' 10406' 9143' 10261' Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 260 sx Arcticset(Approx.) 110' 110' Surface 2623' 13-3/8" 3720 cu ft Permafrost"C" 39'-2662' 39'-2662' Intermediate 9697' 9-5/8" 2135 cu ft Class'G'.279 cu ft Permafrost 38'-9735' 38'-8619' Production Liner 992' 7" 354 cu ft Class'G' 9458'-10450' 8396'-9177' Perforation Depth MD(ft): 10042'-10256' Perforation Depth ND(ft): 8862'-9028' 20.Attachments: 0 Property Plat IS BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Ryan Ciolkosz,564-5977 Printed Name Ken Allen Title Engineering Team Leader 7' Prepared By Name/Number Signature7,/n,1 -ii/-7,-C.7 r`��f11Ke4 Phone 564-4366 Date tj ZZ'/Z Joe Lastufka,564-4091 Commission Use Only Permit To Drill // /`/--' API Number: / Permit prov I qa See cover letter for Number: 2`�'7') 50-029-21798-01-00 �� ll other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: Ell 130 f Te - Other: 1000 � Samples Req'd: ❑yes Do Mud Log Req'd: ❑,Yes �No a a(6--;P O r-j.;ah u t 0 � H2S Measures: Yes 0 No Directional Survey Req'd: ©'Yes 0 No 4)/ Aro _3 * CBL i N1 ITT t -�. 3 , ��— / rpiii.t.,(4....AEROVED BY THE COMMISSION Date e— ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months©r nfeIdd if a (20 AAC 25.005(g)) Submit In Duplicate jit7 / op Z-06A Permit Application � . per` LL �&° Well Type: Producer Current Status: The well is currently shut-in. Request: Approval is requested for the P&A of Prudhoe Bay well Z-06 Ivishak and Kuparuk formations and to prove isolation between these reservoirs to satisfy zonal isolation for WAG injection into the Kuparuk formation within a 1/4 mile of Z-06. The abandonment procedures outlined in this sundry application are intended to satisfy isolation requirements for WAG injection into the Kuparuk. Reason for Sidetrack Produce/Inject into Zn2-Zn4 Ivishak reservoir. Abandon Z-06 and Ensure annular isolation above and below Z-06 Kuparuk formation penetration to allow for offset WAG injection into Z-102. Well History Z-06 is an Ivishak producer with original completion in 6/1/88. No RWO or significant wellwork besides addperfs. Well is low oil rate, high WC and uncompetitive. Well has been SI since 5/12/09. Cemented 13-3/8" surface casing with 3720 cuft of 15 ppg Permaforst C cement. 60 bbls returned to surface. No top job. 14.3 ppg LOT. Cemented 9-%" casing with 168 bbls 13.2 ppg G followed by 211 bbls of 15.8 ppg cement, reported 50- 75% returns after cement hit shoe. Did not bump plug and found top of cement inside casing at 9143' MD. With 30%washout and 50% returns, cement top calculated to be at 8259' MD. No LOT recorded. Plan to run USIT log over 9-%"casing during rig sidetrack and do remedial abandonment work for Kuparuk and Ivishak while rig is on well. Down squeeze 13-%"x 9-%" annulus with 15.6 ppg 50 bbls Permafrost C cement. Cemented 7" liner on 5/29/88 with 63 bbls of Class G cement. Job went per plan. Volume was based off of caliper log plus 50% excess. CBL log run on 7" liner shows fair to good cement throughout liner. Other Requests: Given rigfloor height limitations, a MASP < 3000psi, and the fact that the three ram drillingBOP 9 � configuration is preferred to a two ram configuration with a spool, BPXA requests a variance to the provisions of 20 AAC 25.285 (f) (1) regarding the initial testing of the BOPE when existing wellhead or testing equipment prevents the testing of the lowest set of pipe rams. If the lower set of pipe rams cannot be tested during the primary BOP test, that set of rams will be tested at the earliest opportunity during path-forward de-completion work, i.e., after the completion has been pulled from the well. Safety concerns and spacing limitations with the wellhead height and tubing spool preclude us from installing a spacer spool in the BOP stack. Z-06Ai PTD Page 1 3/21/2012 Scope of Work: The sidetrack plan for the Z-06 well includes the following: during pre-rig operations laying cement across the perforations and cutting the 3-1/2" tubing at approximately 9358'. Pull tubing and run USIT log from tubing stub to surface to verify cement between Ivishak and Kuparuk reservoirs • and Kuparuk and Schrader bluff reservoirs. If cement isolation cannot be verified between the Ivishak/Kuparuk and/or Kuparuk/Schrader with the USIT log, then prove shale isolation between reservoirs to satisfy zonal isolation for abandonment of the lower Z-06 wellbore and WAG injection in Z- • 102. • Perforate two sets of perforations 99 ft apart in Kingak/HRZ shale and attempt to establish circulation up to leak off pressure between the two sets of perforations through the 12-1/4" x 9-%" casing annulus. Lack of communication between perforations will be considered evidence of zonal isolation between reservoirs If able to establish circulation, circulate cement between perfs through the annulus. Lay in at least 100' TVD cement plug above perforations to isolate Ivishak and Kuparuk and at least 100' ' TVD plug above Kuparuk to isolate Schrader and Kuparuk reservoirs. (If cement isolation in annulus is confirmed with CBL, then one continuous cement plug will be set from at least 100ft TVD below Kuparuk to at least 100' TVD above the Kuparuk) Whipstock exit from the 9-5/8" casing at - 6700'. A 8-1/2" hole will be drilled to the top of the Sag River where a 7" drilling liner will be run and cemented. A 6-1/8" production hole will be drilled in the Ivishak. Run sliding sleeves and swell packer production liner assembly with liner top packer. Run 4.5"tubing tied into top of production liner top. MASP: 2863 psi Estimated Start Date: May 1st, 2012 by 0 Planned Well Summary Well Z-06A Well Pre-Produced ✓ Target Ivishak Type Injector Objective 06 API Number: 50-029-21798-00 Current Status Shut-In Estimated Start Date: 5/1/12 Time to Complete: 33 Days Surface Northing Easting Offsets TRS Location 5,959,100 599,046 4305' FSL / 3631' FEL 11N 12E sec 19 Tie in Northing Easting TVDss Offsets TRS (Sidetrack 5'958,746 597,352 6030' 3974' FSL / 376' FEL 11N 11E sec 24 point) Northing Easting TVDss Offsets TRS Production5 958,730 596,611 8772' 3967' FSL / 1117' FEL 11N 11E sec24 Tgt ' BHL 5,958,869 594,335 8921' 4135' FSL / 3391' FEL 11N 11E sec 24 Planned KOP: 6700' MD/6032' TVDss Planned TD: 11,925' MD/8921' TVDss Doyon 14 • BF-RT: 34.3' RTE (ref MSL): 89.42' Directional — Schlumberger P11 KOP: 6700' MD Maximum Hole Angle: -35° in the 8-1/2" intermediate section -99.8° in the 6-1/8" production section Close Approach Wells: Z-102 passes 1/200 Minor risk tolerance and will be shut-in prior to drilling. All other wells pass Major Risk Analysis Survey Program: 6697' to 7000' MD = INC+Trend 7000' to 11925' MD= MWD+IIFR+MS Nearest Property Line: 1900' east of Boundary Nearest Well within Pool: TSAD is 510 ft south of Z-04 44P in build section Z-06Ai PTD Page 1 3/21/2012 Formation Tops & Pore Pressure Estimate (SOR) Estimated Depth Pore Formation Foramtion Top Uncertainty Fluid Type Pressure (TVDss) (+/-TVD ft) (EMW PPg) Surface Casing 2661' and (lower SV2) 2569 NA NA SV1 2877' and 2785(from Z-08) NA Hydrates NA UG4 NA NA UG4A NA NA UG3 NA NA top of logs in parent Z-06 3815 NA NA UG1 3932 NA NA UG Ma 4227 NA NA UG__Mb1 4276 NA NA WS2 4341 NA NA UG_Mb2 4357 NA NA UG_Mc 4425 NA Heavy oil NA fault NA NA SB_Na 4514 NA NA SB_Nb 4537 NA NA SB_Nc 4568 NA NA SB Ne 4580 NA NA SB_Nf 4633 NA NA SB_OA-WS1 4687 NA Oil NA SB_OBC 4805 NA Oil NA fault(parent) 5164' and 4778 NA NA SB_OBD 4878 NA Oil NA SB_OBE 4932 NA Oil NA fault(parent) 5386' and 4956 NA NA SB_OBF 4957 NA Oil NA SB OBFBASE 4999 NA NA CM-2 M-2 5208 NA 8.45 fault#11 (parent) 5699' and 5209 NA fault#11 splay 5590 NA CM-1 5729 NA GCM 10.00 KOP 6700' and 6033 THRZ 6236 +/-20' GCM 10.00 TKLB (BHRZ) 6436 +/-20' 10.00 TKC4 6490 +/-20' GAS/Oil/Wtr 9.50 LCU 6532 +/-20' 10.00 TMLV 6625 +/-20' 10.00 TKNG 7282 +/-20' 10.00 Fault 1 7569 +/- 100' TJF 7577 +/- 30' 10.00 TJE 7818 +/- 30' 10.00 TJD 8045 +/- 30' 10.00 TJC 8285 +/- 30' 10.00 TJB 8400 +/-30' 10.00 TJA 8456 +/- 30' 10.00 Build 1-TSGR 8568 +/-20' Gas 8.30 TSHU 8594 +/-20' Gas 8.25 TEIL 8702 +/-20' Gas 8.20 Z-06Ai PTD Page 3 3/22/2012 TSAD 8743 +/-20' Gas 8.15 45N 8772 +/-20' Gas 8.10 45P 8782 +/-20' Gas 8.10 PGOC 8775 +/-20' 44N 8804 +/-20' Gas/Oil 8.10 44P 8808 +/-20' Gas/Oil 8.10 43N 8825 +/-20' Gas/Oil 8.10 43P 8833 +/-20' Gas/Oil 8.10 42N 8850 +/-20' Gas/Oil 8.10 42P 8859 +/-20' Gas/Oil 8.10 41N 8878 +/-20' Gas/Oil 8.10 POWC 8915 +/-20' 8.10 41P 8915 +/-20' Wtr/Oil/Gas 8.10 31N 8938 +/-20' Wtr/Oil/Gas 8.10 Fault 2 8950 (MD 10090) +/- 50' 41P (after invert) 8921 +/-20' Wtr/Oil/Gas 8.10 41N 8896 +/-20' Wtr/Oil/Gas 8.10 42P 8860 +/-20' Wtr/Oil/Gas 8.10 42N 8855 +/-20' Wtr/Oil/Gas 8.10 POWC 8842 +/-20' 8.10 43P 8832 +/-20' Gas/Oil 8.10 43N 8828 +/-20' Gas/Oil 8.10 44P 8810 +/-20' Gas/Oil 8.10 44N 8805 +/-20' Gas/Oil 8.10 Fault 3 8780 (MD 11350) +/- 50' 8.10 44P (after revert) 8779 +/-20' 8.10 43N 8781 +/-20' Gas/Oil 8.10 43P 8783 +/-20' Gas/Oil 8.10 42N 8801 +/-20' Gas/Oil 8.10 42P 8803 +/-20' Gas/Oil 8.10 41N 8814 +/-20' Gas/Oil 8.10 41P 8840 +/-20' Gas/Oil 8.10 31N 8869 +/-20' Gas/Oil 8.10 POWC 8875 +/-20' 8.10 27N 8921 +/-20' Wtr Wells Within 1/4 mile within pool (See attached Area Review for more detail) • Z-06 - SI. See Sundry for Abandonment • Z-67 - Ivishak Producer • Z-09 - Plugged and abandoned • Z-04 - Plugged and abandoned ■ Z-04A - Ivishak Producer Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Length Top Bottom Size Tbg O.D. MD/TVDrkb MD/TVDrkb 8-1/2" 7" 26# L-80 VaHC°p 2760' 6550'/5997 9310'/8659' Z-06Ai PTD Page 4 3/22/2012 - 6-1/8" 41/2" 12.6# 1$5R VamTop 2765' 9160'/8510' 11925'/9010' Tubing 41/2" 12.6# 1 85R VamTop 9155 Surface 9155'/8508' Mud Program Intermediate Mud Properties: LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH 6700'-9310' 10.3 - 10.5 12-22 20 -28 <6 NA <20 9-10 Production Mud Properties: Reservoir Drill-In Fluid 6-1/8" hole section Depth Interval Density PV YP LSRV HTHP FL pH MBT (PPM Csg Shoe to TD 8.6-8.8 3-12 10-20 > 20,000 < 10 8.5-9.5 < 3 Logging Program 8-1/2" Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res (real time) Neu/Den (recorded mode) Open Hole: None Cased Hole: USIT in cement evaluation mode from top of 4-1/2" liner to top of 7" liner. • 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/Neu/Den including azimuthal density caliper-all real time Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 Intermediate Casing Basis: Tail: 80' of shoe track+Annular volume from shoe to liner top packer with 40% excess and 200' excess above liner top packer Total Cement Spacer -35 bbls of Viscosified Spacer weighted to -11.0 ppg (Mud Push II) Volume: Tail 100.9 bbls, 564 cuft,487 sks•15.8 lb/gal Class G- 1.16 cuft/sk Temp BHST 220° F Casing Size 4.5" 12.6#, 13CR-85 Vamtop Production Liner Basis: NOT APPLICABLE, Isolation achieved with liner top packer and multiple swell packers placed in open hole for selective injection capability Z-06Ai PTD Page 4 3/21/2012 Surface and Anti-Collision Issues Surface Shut-in Wells: Z-112 will have to be shut in and wellhouse removed while moving over Z-06. Z-07 and Z-05 may have to be shut in at surface while the rig moves over Z-06 if the well houses need to be removed Close Approach Shut-in Wells: Z-102 is a Kuparuk water injector that fails Major Risk criteria with Z-06A well plan and is required to be shut-in prior to well spud. Faults Formation Fault MD TVDss Est. Throw Uncertainty Encountered Intersect Intersect Throw Direction Fault#1 - Kingak-above TJF 8,300' -7,569 40' North +/- 100' Fault#2 - Ivishak (31N) 10,090' -8,950 20' West +/-50' Fault#2 - Ivishak 11,350' -8,783 30' East +/-50' Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893) f/guidance. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4000_Qsi (3500_psi on annular preventer). BOP regular test frequency will be 14 days during drilling phase and 7 days during sundry operations. Intermediate Interval Maximum anticipated BHP 3710 psi @ Sag at 8596' TVDss (8.3 ppg EMW) Maximum surface pressure 2851 psi (.10 psi/ft g _gradient to surface) - 115 bbls with 10.5 ppg frac gradient, assuming a 8.3 ppg pore pressure Kick tolerance in the Sag river and 10.3 ppg. - Infinite with 10.5 ppg frac gradient, assuming a 9.5 ppg pore pressure in the Kuparuk and 10.3 ppg MW Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 3,500 psi/250 psi 7" Casing 4000 psi surface pressure Integrity Test—8-1/2" hole LOT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" casing string. Production Interval Maximum anticipated BHP 3764 psi @ Ivishak at 8938' TVDss (8.1 ppg EMW) Maximum surface pressure 2863 psi (.10 psi/ft gas gradient to surface) Z-06Ai PTD Page 5 3/21/2012 Infinite with 8.7 ppg frac gradient, assuming a 8.1 ppg pore pressure in Kick tolerance the Ivishak and 8.6 ppg MW. Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole Planned completion fluids Seawater/6.8 ppg Diesel Pre-riq prep work: Pre Rig F 1. Perform a fullbore P&A subject to the following requirements. Ensure IA is fluid packed during. MIT-T passed to 2500 psi 09/23/11. Caliper shows hole at 2989' MD. CMIT TxIA Failed. i 3y 064s Planned TOC = 9620' MD (100' TVD above Top of Sag River) c�,m� Deepest allowable TOC = 9942' MD (100' MD above perforations) Shallowest allowable TOC = 9375' MD (Rig will need to confirm cement isolation between tubing stub and Kuparuk) S 2. D&T TOC. Drift to 9375' MD for 3-1/2"jet cut. F 3. CMIT-TxIA to 4000 psi. Freeze Protect with 2000' of diesel in TBG and IA. MIT-OA to 2000 psi. Bleed pressure to 0 psi. E 4. Jet cut TBG at—9358' (In middle of full joint below sliding sleeve). F CMIT-TxIA to 4000 psi. Circulate well to seawater or 9.8 brine depending on results of pressure test. Freeze Protect with 2000' of diesel in TBG and IA. Bleed pressure to 0 psi. W 5. PPPOT-IC and T. Function tubing and casing lock down screws. Repair and replace as needed. ✓ 6. Set a TWC if well passes CMIT-TxIA and pressure test from below to 3500. During Rig E 1. USIT in 9-%" Casing, Set EZSV F 2. Cement 7" intermediate casing E 3 USIT in 7" casing F 4. Freeze protect well Post Ri S 1. Pull the ball and rod / RHC plug from landing nipple below the production packer. Install Generic GLV design C 2. Coil to function Sliding Sleeves O 2. Install well house and instrumentation. (and adjacent wellhouses) Proposed Procedure: 1. MIRU Doyon 14. 2. Pull BPV. Circulate out freeze protection and circulate well to 9.8 ppg Brine. Set a TWC and test from above to 4000 psi for 5 minutes and from below to 3500 psi for 5 minutes. 3. Nipple down tree. Nipple up and test BOPE to 4000psi with 3-1/2" and 4" test joints. Chart test Initial BOPE rig up configuration from top to bottom: o Annular Preventer o 3-1/2" x 6" Variable Rams o Blind/shear Rams o Flow cross o 2-7/8" x 5"Variable Rams 4. Pull TWC with lubricator. 5. RU and pull the 4-1/2" tubing from the pre-rig jet cut. Z-06Ai PTD Page 6 3/21/2012 6. RIH with clean out assembly down to top of tubing stub. 7. Rig up E-line and USIT log from tubing stub to surface. 8. Set EZSV on E-line -30-40' above tubing stub a. If no cement isolation confirmed in the annulus between the tubing stub and base Kuparuk, Rig up lubricator, pressure test and perforate 5' of casing -10' above EZSV. b. Set a squeeze packer -80' above perforations. Pressure test squeeze packer and casing to 3500 psi for 30 min to confirm it is not leaking. c. Rig up lubricator and pressure test. Perforate 5' of casing -99' above lower perforations. d. RIH with stinger and sting into squeeze packer, attempt to establish circulation between perf zones up to leak off pressure e. If communication is established, circulate 10 bbls of mud push, 20 bbls of 15.8 class G cement, followed by 10 bbls of mudpush. f. Unsting from squeeze packer and circulate our excess cement off top of squeeze packer with 10 bbls of tail mud push. 9. Spot 45 bbls balanced 15.8 ppg class G cement plug (500ft) on top of squeeze packer. Slowly pull out of balanced plug. Pull above plug and circulate to clear DP. 10. Wait on cement to reach 1000 psi compressive strength before tagging with 15k down weight. Wait on cement to reach 1500 psi and pressure test cement plug to 2500 psi. Chart test. 11. RU E-line and set EZSV at-7180' MD. a. If no cement isolation confirmed in the annulus between the top of the Kuparuk and Schrader Bluff, Rig up lubricator, pressure test and perforate 5' of casing -10' above EZSV. b. Set a squeeze packer -80' above perforations. Pressure test squeeze packer and casing to 3500 psi for 30 min to confirm it is not leaking. c. Rig up lubricator and pressure test. Perforate 5' of casing -99' above squeeze packer. d. RIH with EZSV stinger and sting into squeeze packer, attempt to establish circulation between perf zones up to leak off pressure e. If communication is established, circulate 10 bbls of mud push, 20 bbls of 15.8 class G cement, followed by 10 bbls of mudpush. f. Unsting from squeeze packer and circulate our excess cement of top off squeeze packer with 10bbls of tail mud push 12. Spot 27 bbls balanced 15.8 ppg class G cement plug (300ft) on top of squeeze packer. Slowly pull out of balanced plug. Pull above plug and circulate to clear DP. 13. Wait on cement to reach 1000 psi compressive strength before tagging with 15k down weight. Wait on cement to reach 1500 psi and pressure test cement plug to 2500 psi. Chart test j iA 14. Set EZSV at-6700 ft and pressure test to 4000 psi for 30 min. Chart test 15. PU 9-5/8" whipstock, bottom trip anchor and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Swap the well over to 10.3 ppg fresh water LSND milling fluid. 16. Mill a window in the 9-5/8" casing plus 20' of formation. 17. Perform a LOT. POOH for drilling BHA. o,cc) .- 18. MU an 8-1/2" drilling BHA and RIH. Kick off and drill 8-1/26 intermediate interval to 7" casing point at the top of the Sag River. Circulate well clean and POOH. 19. Change out upper 3.5" x 6"VBR to 7" CSG rams. V 20. Run and cement a 7", 26#, L-80 drilling liner in the 8-1/2"wellbore with a minimum of 150' overlap Or into the 9-5/8" casing. Set hanger/ liner top packer and displace cement with mud. POOH. 21. Change out upper 7" CSG rams to 3.5" x 6"VBR. 22. MU a 6-W drilling assembly. P/U additional 4" drill pipe as required to TD the well and RIH to top of the float collar and test the casing to 4,000 psi for 30 minutes. 23. Displace the well to 8.6 ppg reservoir drilling in fluid. fJ 24. Drill out shoe and 20' of new formation and perform a FIT. �i7`71.r C /Z 'P Azilz 25. Drill build section, per directional plan. Trip for new bit as necessary d Z-06Ai PTD Page 7 3/21/2012 26. CBU 2 times minimum at TD. POOH to the shoe, MAD passing as required by geologist. Open circ sub and circulate the well clean at the shoe. RIH to TD, swap well to solids free mud system and POOH on elevators. 27. Run 4-1/2", 12.6#, 13CR-85 VAMTOP liner with swell packers and sliding sleeves, from TD to 150' inside the 7" shoe. Set the liner top packer and displace the well to 8.6 - 9.2 ppg seawater. 28. Cement bond log from 4.5" liner top to top of 7" liner. '-c.3 r r 29. Run the 4-1/2", 12.6#, 13Cr completion tying into the 4-1/2" liner top. 30. Give AOGCC 24 hours notice, drop ball & rod and set the production packer and individually test the tubing to 4,000 psi and annulus to 4,000 psi for 30 minutes each. Chart tests. 31. Shear valve and confirm circulation. 32. Set and test a TWC to 3500 psi above and below. 33. ND BOPE. NU and test the tree to 5,000 psi 34. Pull TWC. Freeze protect the well to 2,000' TVD. 35. Set a BPV and test to 3500 psi from below. 36. RDMO. Z-06Ai PTD Page 8 3/21/2012 Z-06A Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Intermediate Hole: Overpressure in the Colville is expected to be 10.0 ppg (3137 psi). Kupurak is expected to be a 9.5 ppg EMW (3206 psi), however, pressures as high as 10.4 ppg EMW (3509 psi)have been encountered in the Kuparuk. Original Z-06 well penetrated the Colville with a 9.7 ppg MW and did not see any formation fluids. B. Production Hole: Ivishak is expected to be at a 8.1 ppg EMW (3764 psi) and Sag river 8.3 ppg EMW (3697psi). II. Lost Circulation/Breathing A. Intermediate Hole: Original Z-06 wellbore experienced lost circulation (1500 bbls) possibly due to the Highland state fault crossing when weighting up to 10.6 ppg MW. Z-06A will be kicking of at—500' MD (-200' TVD) below the Highland state fault. B. Intermediate Hole - One fault crossing is expected in the Kingak above the TJF at 8,300' MD. This fault is not expected to be associated with losses. C. Production Hole - Two fault crossing are planned at 10,090' and 11,350' MD in the Ivishak. Well plan is designed to minimize contact with faults. Ill. Faults Formation Fault MD TVDss Est. Throw Uncertainty Encountered Intersect Intersect Throw Direction Fault#1 - Kingak-above TJF 8,300' -7,569 40' North +/- 100' Fault#2 - Ivishak (31N) 10,090' -8,950 20' West +/- 50' Fault#2 - Ivishak 11,350' -8,783 30' East +/- 50' IV. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-%8'window 20'-50'from the 9-%"window LOT 10.5 ppg 7"shoe 20'-50'from the 7"shoe FIT 8.7 ppg minimum 12.0 ppg target VI. Hydrogen Sulfide Z-Pad is considered an H2S site. Recent H25 data from the pad is as follows: Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level Z-06 10 ppm 4/27/2009 #2 Closest SHL Well H2S Level Z-07A 20 ppm 03/17/2011 #1 Closest BHL Well H2S Level Z-04A 10 ppm 01/28/2005 #2 Closest BHL Well H2S Level Z-05 10 ppm 01/28/2005 Max. Recorded H2S on Pad/Facility Z-100 120 ppm 02/07/2010 VII. Anti-Collision Issues A. Z-102 fails anti-collision with Z-06A at 7,180' MD on the Z-06A well plan and at 8,605' MD on the Z- 102 well path. This intersection is in the Kuparuk resevior were Z-102 is perforated and currently injecting water. Z-102 will be shut in before moving to Z-06 and remain shut-in until intermediate casing is cemented. CONSULT THE Z-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. Z-06Ai PTD Page 9 3/21/2012 5961358 5960358 5959358 5958358 5957358 r I I cr %mil I 1.--ic ) ,:r 2 N W iiiiiillif n *17/ N m m —1.1 Vil m ,C N 4\\\ I II m_ I \ _m 03 ei CD I / itillt i .— i -- I Q -m m eI m L o) II lir, f�� I to o N-J I U _ jl I/ /1 I� O I c m ,. P ''.., � 1 m N 1 O I 11 M 1 _ I II 1 Q m w CO x1.21 _ m m m m_ m '" I 1 a Inm M p, In Lu J ( il, 3ions, W {'� ¢ r m u:�1 a m_ m h1 ) a 1 t I 1 CD �i id, ,F 1 N o0 / 1 1 m 1 1. m m m m m U90—Z WOaJ S31IW sz.0 ..,,. ,,. :,,, inI— i' LU UJ ; + 'i 4,4"/ I I I I I I 5961358 5960358 5959358 5958358 5957358 Z-06i Area of Review The following eight wellbores are within the %4 mile radius for review in preparation for the Z-06i grassroots well. The primary cement jobs for each of the wellbore and the current well status are provided. 1) Z-06 — SI. Will be abandon as per Sundry 2) Z -67 - PTD: 2110130. New Well a) USIT logged in 7" from 9494 to Surface. TOC at 3860' MD/3444' TVDss. b) Cemented 9-% with 427 bbls, 1289 sxs, 1.86 cuft/sx of Arctic set Lite and 89 bbls, 431 sxs, 1.16 cuft/sx of Class G c) Cemented 7" with 155 bbls, 468 sxs, 1.86 cuft/sx of 11 ppg Litecrete and 41.1 bbls, 199 sxs, 1.16 cuft/sx of Class G. d) 4.5" Liner cemented with 53.2 bbls, 194, sxs, 1.54 cuft/sx of Class G. 5 bbls cement circulated to surface off top of liner. 3) Z-04— PTD 1891230. Plugged and Abandoned a) Cemented 13-3/8" casing with 3723 cuft Permafrost. 132 bbls returned to surface b) Cemented 9-5/8" casing set at 9162' MD/8563' TVDss with 1863 cuft of Class G. Calculated top of cement 5268' MD/5031' TVDss. No losses reported c) Cemented 5-1/2" with 442 cuft of Class G. d) Lay in 26.5 bbls of cement to 8690' MD inside 5-1/2" Liner e) Set 9-5/8" E-Z drill plug at 6912' 4) Z-04A— PTD: 2042300. Producer. Last Test 7/3/2011 = 484 bbls per day. No Annular communication issues a) Cemented 13-3/8" casing with 3723 cuft Permafrost b) Cemented 9-5/8" casing with 1863 cuft of Class G. Calculated top of cement 5268' MD/5031' TVDss. c) Cemented 7" Liner with 88 bbls, Class 'G'. No losses. 30 bbls of contaminated cement circulated off top of liner. 9-%" KOP at 6890' MD/6,538 TVDss. 7" casing shoe at 9031' MD/8585' TVDss d) Cemented 4.5" with 94 bbls (345 sx) Class 'G'. 5) Z-09- PTD: 1890850. Plugged and Abandoned a) Cement squeezed in 7" liner. Top of cement 10771' MD/8667' TVDss b) Set EZSV at 9812' MD c) Cemented 13-3/8" with 3684 cuft of Permafrost cement d) Cemented 9-%" casing with 2262 cuft of Class G e) Cemented 7" liner with 372 cuft of Class G. Good returns throughout job. Cleanout run found cement from 9796 to 10118' Md. CBL shows bonding from top perf to inside 9-5/8" casing N 0 ,- 0:77: 0N-,0, ^ m N-n O n m 0 m N Up m m M m m 0 n m N N Q m O O p p<7 M^ N m C rNN( W0600 mnpN.N MQ00 ,N0003, toNpU) m 0 )76NQONONaN�O0,m0n, 0,66 MNNryWC .064 OO M , 0 O Om N d Irl o.-.--.- n ren n ,,,n0<p 666666mm6616)6)6) 0660606 Om 66666 6 U0)N UO)110 N 660666U)U)U).0 U) h L11,066 U)NU)NU) U)U)U)U]U) U) C N 0. 0= 4,-N.--co 00000 U)m p ry 00N Q 4100 N Q m 000 U) ^ N- p- C mM'-O m rnma 0) m'-U)n)N OONM M0U),-.- ,mmpm t <p0001- ‘ t-6666 <04.-0 -0i ,6. i0 rmroo 0000)0 U) o .r 1C SNN,- 0000 mmmmn nnn06 mmmm rm600) O N O n n r n n .--,,66 mmmmm 66666 mmmmm 66666 r m m m m m m m m m m m m m m m m m m m m m m m m m um]m m m m m Z N ;06666 U)U)U)U)U) m U)U)h N h U)U)N U) 66666 m o m m o) m o)rn 0 0 0 0 0 0 m o o m m 0 0 0 0 0 mmm U)U) m n U)U)6 U) U)U)N U)U)U U) L06;0.06 .06666 66666 U)U)U)U)U) U) jp M p N N M Q r-))0 0 (N N N M U) m n O N M 00000 00000 C 00000 O NNNNN NNMMM MMMMM MmF)pp p 0'046666 6 Ul Uj U)U) 0 U)Uj Uj U) ,06666 66666 Uj 10 Uj Uj Uj Uj d g?, E O m O(N 4 0 0 00000 00000 00000 00000 00000 0 _cg m O n O 0 00000 00000 00000 00000 00000 O O O 0"0N0 QQe}QQ 44444 •YQQQQ 0444 O 66666 O L OD M. LL eJ , J JN JMr J J J J J J J m m m m d Nn ..... . ~_ Nm .- mnm < W NNmOn= _____ _N 0 j•O OOOMN 60 - Tm N. Wr m 6.66'',' Omrn Q0NO rrrrnNr.NrQ000 E • C N N 7 0d L J J O w. 0 0 0 N c U)000M (0(0'000 P. )o0ONM Nm77N OMm m0 N NMO0 a U F O n N 6Om)00H lmOmoN6m m6‘-,,m pltpj<NOrr rrrQmm mNNh N m m Q L -p m m 0 0 0 0 0 0 0 0 .- N N N N M d CAE o O N O 6' m 7 N N N N N N N N N N N N N N N N N N N N N N N N N �09 2.O O m n t Z' m= < - 66 0 0 U. O r O 0 0 2 0 O d O 2 N O d'm U) N U) m 2 m H O N> _N m U)M m O Q .-6,6,-- r r m M m,;-6N, O N M n U) p n m)-m N Q Z.- 0 6 0 0 0 0000, n 0 m r r ,01,-,-M N n 0 N N 0 p p p 0 p Q Q m r N 0 N W N M 0 p O N ?Uj O)N n 44n,-,- « 660.,6m nm mmmm 00000 00000 0ornmmN<pp C N?<?t? N? '.2';"?'?? <7<?M«N? N?N?N?qv I`TYY4 v.?<?<?<? fV Mm6666m6666 0 C z m d a E c :F m O o r g 0 v 0 0 d 5 c m f d A d NJ1 /C/U ..E rnq ww.2L ei 0 ami o d 0 LL p U 0 W C C C C d C Z d () 0 M 0 m M M 0 r'm m O h N 0 r M m m °,7,20V6') N n n d w� U d d 2. a d 2 d 01 W- N m N M m N m p O)m N m m 0 6 0 0 r m o m Ol N m N T CU U U c c e W f/1 0.0 N d G g 9 O O N m m N O Q N Uj as n ,u Q m O m m Q n n r 6^lD,-)- N Ou) dd f O O go Ou) NN Om-m00 MMph mnm0m mmm00 0mMn0 M NON ^ .,7,71717 171717717 NNN7 M QO O nww U2U• ? dCQ0 NN NNNNN NNNNN NNNNN NNNNN N AC dUUd UU fYRC- CC CLU O Q. 2 3 O d A . C7dd > p- ddOd 0 = OO » CL cu O 0= „m,00 M O ry 0 n N 0 N N 0 N0,-00, mmmNr N N N N N N T p N M Q,7 O N p m O p m p p m p 0 M.-M .-O m Q.- ,p p p p p m T pNNMm OONmr NOON-NOO ,_0000(00(0 00000000 NU0<mp0<`) n CO m T Um)<fON6O<o No 66,066NM6Q <moc00006 <0666, ,nnn, ,,,nm m O L M >1 13 Q12 a 3 m m O m O 0,0„, ,O O n 0 ..... 0,000 0 0 0 0 0 OO NCOOm mONM 000N O0mr.- nmon 00000 O 1 0 mONmm 6.-m,-6 <066NO UjMNNmONNNNN6,06. UN ryMMQm -0M0mmr0Mn rynnnQ 0nrnr mmr p m x0000 NNNM ,,,,,.mm 00,-NN NUUm0 N m0000 0 .'00 mmmmm mmmmm ,r,-1---,,nr rrrrm m Zill 0 - U N m 7 n 7 SEM ov= == M p N y ^ p m 0 0 0 N N 0 Q,- M m M U),- M Q N,-Q Q N N O O 0 0 0 0 0 O == O d m 0 0 `"' 0 0 0 0 0 00m‘70 N m r N O m N m M N N M Q 0 0 O O O O O O ` C f 446‘--- --4,-. p 0 m m m 0:666, ,4466 Uj U1 Uj U)Uj a-, 0,-0 E N N N N N N N N N N N N N N N N N N'-'- '-'-0 n N N N woo.... N 0 MO OEM m 6 Q 0 N a 2,2 o U)a W 3 a �OQ C c7 f0 M U e 0 V V MM V V m V V n V ONN p0U0i mn n O m m O 60000 O C 7 0▪ r O C 1" O N 0 0 0 0 0 O ' O m�m � V ''� <'p NMMMM (606666 mmpRN 664�N NOmrm copmao0 N p m N <¢O W E N ` m I--O 0 d NX-Ca • xn L O N M Q T o N .b m M 0 W-m Q m c N m 7 m N ta ? N 0 . 8 o o V Q '' ,-.0,0 • m a N N a m N N Z Z Z 0 0 0= 1-0000 0 0 6 0 0 O O e_N O m O O O N 00000 O N O n O m 2.- � 000 00,00 U)ONU)O x0004 000r mccm m 4,666 6 000)00 Uj Ory Uj 0 o 000 Nh C)0000 poo O N M 0 0 N 00 M O O m O U)O 0 M000, M 0 0 0 0 m 0 U)m N L M r n r m 0 0 0� N N N M (0 4 0 0 6 n m 0 0 0 O N M U)r O E m mmm m m m m m n r r n r ,,t..-,, r n n m m m mmm m m 00 m 4.7. '"N o y j� o O d ` C G K ND W 2 is.,i- d d 0 _ Cal p •• 0 p w J Z j« N CIO ti w d rc m D oE LL S r ?) ZCCc9mO rrQDoo7w Dov .. ZZ - uumaodd ^ 0d > ooooowcdE t'01 3s nt o nto CC ndQ p H u 2 Nm mJ U Y Y U 02 U pc 2 ZU C )' 0 a 2su.W0 U c m»> > v0c= oUILLI3mQtoNfUooUa 0 QHmO H H F-J N. W U W 1-ll_F-F-F- 1- 0 N O N O)^ 0 n 2.-ON.of �OOO).- 20000 Q OON O C r0 Naf O 2 W C LLT M 0002 0�C10 V 0 NOO II) C N OpNp0 0`�OIN.-Q OQNO ON .�p-�v) nM?0 0a)OI.N 000 W 0 I�0 Dt�N aDNCRC0 00 V p) TA a.' �OOf 01 0D0 2-10 ) Nr 000 0(0(010 OQ 200(O ..,,,K',Si N�02I 003-03(0 ONi ONE OO)N-lN. N.CONN O 07 t0'IA co M a W 0a,0)a co 0a,at0o, asc0)atco 60000 a, 0 00000 •0)000O�0 000)00) a I O L O L 0 0 L n to O 0 6 O)O L o Co 0 0 0 0 0 0 0 0 0 0 0 u)O O ua;to O o)N O N O N O L 0 0 0 0 0 0 0 0 0 0 N p (7 p p Q L7 o C H OOMf o e.us a COPi_. )D Npp.-o O o;O!?(y,q my 0301.)(00, 0017 CO0 0000)1100 O00NNO 100'M Y070 V o. O^nn n rn N.Nn A^AAS nnn Q^ ^�00n 00 nr r0 0000 N.CO 000CO0CO 0p CCO 03 p0000^p2N.2 Qgo coo co0N a 0 co co m O co 0 0 0 0 CO 0 0 0 CO O CO CO CO 0 03 0(0 0 0D OCO 0 03 0 03 CO 03 CO 0D a)OD 0 00 OD m O O Z 0 0 0 0 O h O O)[) )O 0 O O h O h O O O O�)O O O O O O CO0 co O O O O)O O O O O O O O O O O O O O N_ hhhh 000000 0LL�nhhh hN Y6to6 N(]NON ONCto6 00000 N0LLC)00 NNNNN 000 n CH ,-'-'- N000)N Nge-QO 0N-NN0 ONMCo 0 000,N NMNN- NN0M0 0000)O N00 •• v'-o O Q C QLn co 036 to O 00 LQ010 00000 ONS r.-f....0 000000 00000 000 O C h h h h LDmOhh Oh )lCIU hhULAh .0)010)00 LCtri O)6 LD LD 666 000 60 00000 000 d _� e ❑ Z. pp p p O O O O p 8 0 p 0 0 0 0 po 0 0 0 o p o p o 8 0 0 o O O O O O o o 8 o q 0 0 8 8 q N O OJ 0 O OCC C OOj 6007 0)Oj F)MO) MO)co ,6OOj 0)M Oj M 62 MCO OOP.o)0 DD OC GDC O 00000 000 1.7 LL e On H 0)co JJ J J-I J-IJ-IJ J-I J-IJ JJ_I___IJ0p M=0 J NN-O=J CJ)-I=NJO 030�ix N S co o x100 t00 ~"' 2=22 LO a0L.aN w000m 00)00 mm 610".NC-,0(o, Lora 2cx 000 C(0 0 N . =O 000 000 pop 000..: 0-�.-C 0000 C COLO CO N ROC 6 0 CO N- N-0 alN.n 6 LOA CO') 0 •-t-7,.012.22) W N N 10 Ve 000'- 0.0000 0322017 OMD 0000,t0ON O0f O N0,CNO. N.027,OfO,o� C2'),ONND r W C^•I An "000CNOQ COO O'r 000 of 0006 Npi�tCe r0)2.�C p00000 Cy Njo0 0N-ON MO) co� a7 NC00 C 2 0)000 03000)2 NCtryryQO0 0000)D- CV Q0.-C r V 0 P MMOQ NNRrN NNNo•- '0O 0)a)M(4) M 0)M 0)0 00000 00000 00000 0r 0 a, N NO .-2 0) O O N- LL N N N N N NNN N N N N N N N N N N N N N N N N N Cl N N C? C`j P j C j N Y Y Y g Q Y 17717 7 4 7 `V q y (0 0 • O N O C 0000 CO*N0o NN.000 N-O N.0) ')-100 c OO.-or 00 10-0 0 CDN CO2 MM N-.- 0*-r 000 Q Z NO0V O O.-- ON 0102 00002 21032.0 o0 N.q0 00)000 $N.opt--N-00) 20000 NCO 1-010 CO O0Cco:* CO 0LC) Ch CV P 0000(') '(D6 O)(D N 0 n(7 0 0 10100N. LCItri 10U )0 (DCD6Cr 6 000 o OQ Cl 0010 LO OLO' 000 001001 070)NNN N 00 01-00 0000)0 000(00 00000 O W ED CO 0 2 07 Ch o) 0'7 6 M 0?0? aj Or 17(7 C7 0�C7 c?C�C7 <7 C7 c?c?N CV NNN N CV N'77 C i C , i L C i C i C -O'''•g N YL 10 C 0100 Co ZNNN a 0 app p pp 7 Q 0 0 0)02 0000* 000,0 *N-N- 0010-..0-120. to LC) Q0 C00. 030077 L(0I N NC0000 C100.0.0-0ON1N-ANN N N 0)(CNN Nut 0) 2 a)NN-0 CO Oj2 C 600002- 'N ONS^ ON 01 CDI.a)K)0 COOT N l) N.N.CO > QO2.N. 0r7N•c0)OM 0)0OON. N.Of Q o C7 LO C0.NO 0003(7 20000 _N NC_N.N N NN N 03 0 Q 07 M 01 01 01 0Q 4'0000 0 Q Y'JO LL')LO 000 0 Of N N M 2 ON. 0 N NNN N NININN N NNNN NNNNN NNNNN 0V N NN0') 200070 000.0 044 Q R CO)000 C • 7 0Ea1*o-a g0��o-a 0p0a>Q »<aa 00000 VR-ate 06s-0� «66W W"467 'n�� CO �.... 001rOh W OMDRo)ON) 10'00 CQa N-OM) 0144 N OO) 000000 W 0^V 0200) 00')00)0)NO r4C-12.NN.(00 0nr 0Q {Cpd0 ' 6 to Q g 0 0 00N-N.0 00000 0030)0 00200 203 g o O 00000 20000 0000 0) 0)00 o 0 0 0 0 CO 0 CO 0 0 CO 0 0 0 0 0 0 0300 0 0 0 a)0 00/000 00000 03000300 00000 000 o L In $p(77 0y 0 u) • • C o o 0 o N ono o m o o 0 0 000100 0 0 0 0 0 o(ONN.o 01 0 0 CI 0 0) 0.N-CO 0 0 o 00,Q-L Lon pOp 0 4-00 1-0 0 O 8220 NQ-00)000 4002g 22422 U))N-00 007 (072200 00(0700)0) 0000000000 m N-000000100 10.0 N 0000000 OOOmm 00000 000300 00000 0000(0 0000303 030030000 003030303 03030 M 0 W N 2 � We 00 00 82810 0 30000 N000 0 O 0 N?.-0O �O0'.0L, SO�N O 03 N N OO N 030003 Q N- 000 m W 7 I- h)0)101() h MN 'COLO 0 OOCO 066, 00 W o)0 60)0)66 66Oi o 0000 000P.00 03 0000 00000 000000 00000 ON-N--N- N-1-000 00000 0(0(0i E NNNN NNNNN 0 V NNNN N N 0`I N N NNNNN NNNNN NNNNN NNNNN NNNNN NNN I-r Z Q C)Z I- y 7 H J 1-C LL N N J E_ p p p p o O N iiiJ W C`-' 0000 017 W N oo7 0?22 R.- 0ONi 02).0 n 2402 W N W(OO,000000, N NN0-0000 U)).N r1 Nr- 203 00201 (00703)0 �i7LL L co OD OD co LOO.-ONO) 0)000)0,')* 000000 000LOICOoN NQ.0O0)0 W 00000 0 W W O)W 000N(OO LO LO� 2.2 rM 0 J M co e ce LL O O N LL L1 IS LD0O 003 N-2 . d M 0.- 80,8.- Q p {p J 0 CO Q aO(QO NN.00- Is-004400 t 77 t 77 NQQ-N i)0`-!R coQO N 0 0 0 0 p 0�o N 020.0 O N N 7700-700 Lci co o ms 0 0 N 0 0 L0CI(00 0 _ 0000 00000 00616 00000 0000)0 00)0000 00002 170037 M 0'j R LN COO)00 00 03 m m� (~m 070) 0 07000 .1.1.1.1.-r) O 0 CD 0 0 N N O U O 0 0 Or 0 0Uo o IF U� � O 0 �a M 0 Qco 6 O U =c E m¢¢e 0_ =¢ 0 L (99pz az az OO a OaU I- ` 1- I-6 OO60 00000 C)0 I-I-I- . 1- I-I- QIX"1. 0 00 ) WLLLO I- WHIU LLLI- W 0 bp Schlumberger WELL FIELD STRUCTURE Z-06A (P11) Prudhoe Bay Unit-WOA Z-PAD Magnetic Parameters Surface Lccat90 7.7027 Alaska State Plane.Zone 04.1)8 Feet Miscelfancous Model 000M2011 Dip, 800071 Date: March 29 2012 Leh N 70 17 51 738 Northing, 5959100 11 RUS 0,14 0000 975513900 Slot Z-06 0/0 0.7. Rotary Tatte(89 Oft above MSL) 009 000 20066 FS. 57845.87T Lon, W 149 11 52 473 Eeeting, 599046 95 R. Scale Fact,0.59001114 P9n. ZOOS/Pill 50/0808 July 22.2011 2000 2500 3000 3500 4000 4500 .06 Tie-In Survey 6000 6000 Top Whipstock Base Whipstock Cry 4/100 6500 6500 End Cry 7000 •••• 7000 Cry i/100 0 0 "2- End Cry 7500 7500 O Fault 1 V 8000 8000 Tgt 1 Sat Cry 8/100 Tgt 4 End Cry Cry 10.5/108 • "":: :::::::::. 7"Csg Fault 3 Cry 13/100 TO5 11•11•11•11•11M1MilE1.111111•11•11•11•11•1... • emi•simissilmitsiomlimiimiimmommtmstmidosmnmemes..s., smomoode snle••••••••••seema..E1.• •••••••notannEnsums.••••••••••••••••••••• .•••••••••...E......0..ma.m..••••••••••"mns.m..••••••••••, • wicasalii !!!!!!!!!!!!!!!!!!!!!!!!!:1-2. ',..!!!!!!!!!!!! 9000 9000 end Cry Z-06A(P11i End Cry End Cry Fault 2 Tgt 3 -06 TD Cry 8/100 2000 2500 3000 3500 4000 4500 Vertical Section(ft)Azim=267.95°,Scale=1(in):500(ft) Origin=0 N/-S,0 E/-V 0 7E I! � / § - a r g «, . ! C , Ci CI i ab CI S r, ,_ 6 = _; -0P- ,_ I. ■ . _ . /\ . \� } CA � > ) CI Z « + ( : N .1 \ ,-II. i i . cl / z - F. i A !§| -»§ LU a{\A E I 2_ � . . § \ jr. 7 \§; a f M T7 i \ )|| .as o CO {\ U) 2 ga -43 c \\ § v CL ,;! 9 74 — — 0 2 0 l •TD § �1 g� �■ a 2| it j I C "CI 0 ..-. , le. \ .§ & �j . « e 10 0 0 N12 _ !; 7 { . 9 Y. ; .i o 0 1- «< N ®< N U0017:&6=inns s », 95— Prollbore: Planject: PrudhoeZ06A Bay Site: PB Z Pad Well: Z-06 90— Design: Plan #11 Z-06A 85— We 80— 75- 2-06/2-06 70— 65- 60— c_ O 55- 0 0 Co a 50— a) Z-06 Z-06 c - U T 0 a>aa) 4 0— U 35— 30— Z-062-06 25— 20— 15— Z-06+2-06 10- 5— Z-06Z-06 o gazoc 1 , 1I , I I I , I I 6450 6600 6750 6900 7050 7200 7350 7500 7650 7800 7950 8100 8250 8400 8550 Measured Depth (300 Win) BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Z-06 Project: Prudhoe Bay TVD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Reference Site: PB Z Pad MD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Site Error: 0.000 North Reference: True Reference Well: Z-06 Survey Calculation Method: Minimum Curvature Well Error: 0.000 Output errors are at 1.00 sigma Reference Wellbore Plan Z-06A Database: EDM .16-ANC Prod-WH24P Reference Design: Plan#11 Z-06A Offset TVD Reference: Offset Datum Reference Plan#11 Z-06A Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 5.000 Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,389.07ft Error Surface: Elliptical Conic Survey Tool Program Date 7/19/2011 From To (ft) (ft) Survey(Wellbore) Tool Name Description 97.45 6,697.45 Z-06 Srvy 1 GCT MS(Z-06) GCT-MS Schlumberger GCT multishot 6,697.45 7,000.00 Plan#11 Z-06A(Plan Z-06A) INC+TREND Inclinometer+known azi trend 7,000.00 8,500.00 Plan#11 Z-06A(Plan Z-06A) MWD MWD-Standard 7,000.00 9,310.76 Plan#11 Z-06A(Plan Z-06A) MWD+IFR+MS MWD+ IFR+ Multi Station 9,310.76 10,800.00 Plan#11 Z-06A(Plan Z-06A) MWD MWD-Standard 9,310.76 11,925.00 Plan#11 Z-06A(Plan Z-06A) MWD+IFR+MS MWD+ IFR+Multi Station 7/20/2011 3:50:58PM Page 2 of 5 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Z-06 Project: Prudhoe Bay TVD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Reference Site: PB Z Pad MD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Site Error: O.00ft North Reference: True Reference Well: Z-06 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-06A Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#11 Z-06A Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB Z Pad Plan Ivi Z-50(SA)v6-Plan Z-50-Plan#7 Z-50 vE 2,897.45 2,940.00 684.78 45.42 639.40 Pass-Major Risk Plan Ivi Z-51 (NA)v6-Plan Ivi Z-Z51-Plan#2 Z-f. 3,097.45 3,185.00 434.80 49.92 387.81 Pass-Major Risk Plan Ivi Z-66(SC)v6-Plan Z-66-Plan#12 Z-66 2,290.74 2,535.00 307.05 43.09 264.20 Pass-Major Risk Plan Kup Z-114(27+45)v6-Plan Z-114-Plan#1 2,822.13 2,835.00 84.05 39.36 45.09 Pass-Major Risk Plan Sch Z-202(NB)v6-Plan Z-202-Plan#2 Z 4,563.47 6,840.00 637.82 95.19 543.88 Pass-Major Risk Plan Z-400(21-35)-Plan Z-400-Plan#4 1,236.83 1,295.00 285.44 21.66 263.78 Pass-Major Risk Plan Z-401 (33-35)-Plan Z-401-Plan#2 860.69 860.00 291.67 13.08 278.59 Pass-Major Risk 2-01-Z-01 -Z-01 2,762.55 2,765.00 179.04 38.51 140.54 Pass-Major Risk Z-01-Z-01A-Z-01A 2,762.55 2,765.00 179.04 38.51 140.54 Pass-Major Risk Z-01-Z-01 APB1 -Z-01 APB1 2,762.55 2,765.00 179.04 38.51 140.54 Pass-Major Risk Z-01-Z-01APB2-Z-01APB2 2,762.55 2,765.00 179.04 38.51 140.54 Pass-Major Risk Z-01 -Z-01 B-Z-01 B 2,762.55 2,765.00 179.04 38.51 140.54 Pass-Major Risk Z-01_DIMS-Z-01 -Z-01 89.38 89.42 175.07 2.21 172.86 Pass-Major Risk Z-01_DIMS-Z-01-Z-01 89.38 89.42 175.07 2.21 172.86 Pass-Major Risk Z-01_DIMS-Z-01-Z-01 89.38 89.42 175.07 2.21 172.86 Pass-Major Risk Z-01_DIMS-Z-01A-Z-01A 89.38 89.42 175.07 2.21 172.86 Pass-Major Risk Z-01_DIMS-Z-01 B-Z-01 B 89.38 89.42 175.07 2.21 172.86 Pass-Major Risk Z-02-Plan Z-02B-Plan#3 2,897.45 2,895.00 143.60 42.79 100.82 Pass-Major Risk Z-02-Z-02-Z-02 2,897.45 2,905.00 143.61 42.91 100.71 Pass-Major Risk Z-02-Z-02A-Z-02A 2,893.64 2,895.00 143.55 42.83 100.74 Pass-Major Risk V Z-03-Z-03-Z-03 145.64 140.00 105.61 3.03 102.58 Pass-Major Risk Z-03-Z-03A-Z-03A 145.64 140.00 105.61 2.59 103.02 Pass-Major Risk Z-04-Z-04-Z-04 2,833.95 2,840.00 71.61 36.08 35.53 Pass-Major Risk Z-04-Z-04A-Z-04A 2,833.01 2,830.00 71.58 36.06 35.53 Pass-Major Risk Z-04 DIMS-Z-04-Z-04 89.40 89.42 70.28 2.21 68.07 Pass-Major Risk Z-04_DIMS-Z-04A-Z-04A 89.40 89.42 70.28 2.21 68.07 Pass-Major Risk Z-05-Plan#3 Z-05APB1-Plan#3 2,845.89 2,850.00 44.36 39.19 5.17 Pass-Major Risk Z-05-Plan#4 Z-05A-Plan#4 2,845.89 2,850.00 44.36 39.19 5.17 Pass-Major Risk Z-05-Z-05-Z-05 2,845.89 2,850.00 44.36 39.19 5.17 Pass-Major Risk Z-06-Z-06-Z-06 6,896.71 6,900.00 11.11 94.61 -55.01 FAIL-Major Risk Z-07-Z-07-Z-07 1,557.58 1,560.00 30.49 22.78 7.71 Pass-Major Risk Z-07-Z-07A-Z-07A 1,555.77 1,555.00 30.46 22.75 7.71 Pass-Major Risk Z-08-Z-08-Z-08 2,652.69 2,655.00 78.38 37.75 40.64 Pass-Major Risk Z-08-Z-08A-Z-08A 2,655.79 2,655.00 78.41 37.80 40.61 Pass-Major Risk Z-09-Z-09-Z-09 1,235.94 1,240.00 101.29 20.92 80.37 Pass-Major Risk Z-09-Z-09A-Z-09A 1,234.44 1,230.00 101.26 20.90 80.36 Pass-Major Risk Z-09_DIMS-Z-09-Z-09 89.44 89.42 104.96 2.21 102.75 Pass-Major Risk Z-09_DIMS-Z-09-Z-09 89.44 89.42 104.96 2.21 102.75 Pass-Major Risk Z-09_DIMS-Z-09A-Z-09A 89.44 89.42 104.96 2.21 102.75 Pass-Major Risk Z-10-Z-10-Z-10 612.49 615.00 140.20 10.59 129.61 Pass-Major Risk Z-10-Z-1 OA WPS-Z-10A Wp03 613.91 610.00 140.23 10.62 129.61 Pass-Major Risk Z-102-Z-102-Z-102 7,180.05 8,605.00 267.12 64.20 212.25 Pass-Minor 1/200 Z-102-Z-102PB1 -Z-102PB1 363.41 355.00 273.53 7.40 266.13 Pass-Major Risk Z-103-Z-103-Z-103 1,377.68 1,390.00 231.04 20.06 211.06 Pass-Major Risk Z-103-Z-103PB1 -Z-103PB1 1,377.68 1,390.00 231.04 20.21 210.90 Pass-Major Risk Z-103-Z-103PB2-Z-103PB2 1,377.68 1,390.00 231.04 20.06 211.06 Pass-Major Risk Z-108-Plan Z-108A v5-Plan#2 Z-108A 506.77 500.00 50.38 7.92 42.47 Pass-Major Risk Z-108-Plan Z-108APB1 v5-Plan#2 Z-108APB1 506.77 500.00 50.38 7.92 42.47 Pass-Major Risk Z-108-Z-108-Z-108 506.77 500.00 50.38 7.92 42.47 Pass-Major Risk Z-11-Z-11-Z-11 2,842.47 2,855.00 446.36 40.48 405.89 Pass-Major Risk Z-11-Z-11A-Z-11A 2,842.47 2,855.00 446.36 40.59 405.78 Pass-Major Risk Z-112-Z-112-Z-112 661.68 655.00 20.58 11.00 9.57 Pass-Major Risk Z-112-Z-112PB1 -Z-112PB1 661.68 655.00 20.58 11.00 9.57 Pass-Major Risk 7/20/2011 3:50:58PM Page 3 of 5 COMPASS 2003.16 Build 73 BPPASSPORT Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Z-06 Project: Prudhoe Bay TVD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Reference Site: PB Z Pad MD Reference: Z-06A Plan D14 @ 89.42ft(Doyon 14) Site Error: 0.00ft North Reference: True Reference Well: Z-06 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-06A Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#11 Z-06A Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PBZPad Z-112-Z-112PB2-Z-112PB2 661.68 655.00 20.58 11.00 9.57 Pass-Major Risk Z-12-Z-12-Z-12 2,846.29 2,860.00 469.71 41.42 428.30 Pass-Major Risk Z-21-Z-21 -Z-21 2,807.40 2,815.00 433.67 38.96 394.71 Pass-Major Risk Z-21-Z-21A-Z-21A 2,796.15 2,795.00 433.61 38.91 394.70 Pass-Major Risk Z-27-Z-27-Z-27 1,528.68 1,530.00 275.63 22.66 252.97 Pass-Major Risk Z-28-Z-28-Z-28 2,818.58 2,825.00 262.65 37.63 225.02 Pass-Major Risk Z-29-Z-29-Z-29 2,018.56 2,020.00 257.73 24.88 232.85 Pass-Major Risk Z-30-Z-30-Z-30 1,040.41 1,040.00 255.75 14.04 241.71 Pass-Major Risk Z-30-Z-30A-Z-30A 1,039.54 1,030.00 255.74 14.03 241.71 Pass-Major Risk Z-31-Z-31 -Z-31 825.37 820.00 263.59 11.87 251.73 Pass-Major Risk Z-32-Z-32-Z-32 2,839.89 2,845.00 262.39 38.41 223.98 Pass-Major Risk Z-32A-Z-32A-Z-32A 2,838.35 2,840.00 262.37 38.39 223.98 Pass-Major Risk Z-32B-Z-32B-Z-32B 2,838.35 2,840.00 262.37 38.39 223.98 Pass-Major Risk Z-32BL1 -Z-32BL1 -Z-32BL1 2,838.35 2,840.00 262.37 38.39 223.98 Pass-Major Risk Z-32BPB1 -Z-32BPB1-Z-32BPB1 2,838.35 2,840.00 262.37 38.39 223.98 Pass-Major Risk Z-32BPB2-Z-32BPB2-Z-32BPB2 2,838.35 2,840.00 262.37 38.39 223.98 Pass-Major Risk Z-33-Z-33-Z-33 3,291.21 3,295.00 268.80 51.16 217.74 Pass-Major Risk Z-33-Z-33A-Z-33A 3,371.06 3,390.00 228.24 52.39 175.87 Pass-Major Risk i Z-35-Z-35-Z-35 1,853.32 1,850.00 192.47 22.34 170.25 Pass-Major Risk Z-35-Z-35PB1-Z-35PB1 1,853.32 1,850.00 192.47 22.50 170.09 Pass-Major Risk Z-38-Z-38-Z-38 785.45 780.00 313.71 9.89 303.82 Pass-Major Risk Z-38-Z-38PB1-Z-38PB1 785.45 780.00 313.71 9.89 303.82 Pass-Major Risk Z-38PB1DO NOT USE-Z-38PB1 -Z-38PB1 785.15 780.00 313.71 10.04 303.67 Pass-Major Risk Z-67-Z-67-Plan#13 Z-67 719.66 720.00 175.95 9.93 166.03 Pass-Major Risk Z-67-Z-67-Z-67 724.64 725.00 176.01 10.13 165.89 Pass-Major Risk 7/20/2011 3:50:58PM Page 4 of 5 COMPASS 2003.16 Build 73 Project: Prudhoe Bay Site: PB Z Pad We l l: Z-06 Wellbore: Plan Z-06A Design: Plan #11 Z-06A From Surface to TD Scan interval 100 ft Scale 1 : 50 Z-102 Passes Risk-Base 1:200 Z-06 at NOERRORS 175 330 30 150 125 100 300 60 75 \ —50 • \ \ \ \ � A 1 182 .7090 2 t 7-06/Z-06' 7356 . 1 (-----689S-99407 6797 27066971 90 lel II ! � , I1 � , 1 I / / / i iii / � ' //i 75 240 120 1011 12 150 210 150 175 180 Travelling Cylinder Azimuth (TFO+AZI)[°]vs Centre to Centre Separation [50 ft/in] TREE= MCEVOY WELLHEAD= MCEVOY 6 SAFETY NOTES :THIS WELL HAS CORKSCREWED ACTUATOR= OTIS0 TRB. COOL WELL TO RELIEVE. KB. ELEV= 92' BF.ELEV= 55.12' KOP= 3100' 2106' —3-1/2"OTIS SSSV LAND NIP,ID=2.75" Max Angle= 40 @ 10000' O Datum MD= 10080' Datum TVD= 8800'SS GAS LIFT MANDRELS 13-3/8"CSG,68#,L-80, ID=12.415" —{ 2661' ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 2989 2989 6 OTIS DOME RM 16 04/10/09 6 6177 5689 35 OTIS SO RM 20 04/10/09 Possible Hole in tubing: 2989' '1 5 7533 6806 35 OTIS DMY RM 0 06/01/88 4 8069 7250 33 OTIS DMY RM 0 09/23/08 3 8604 7695 34 OTIS DMY RM 0 06/01/88 Minimum ID = 2.75" @ 2106' 2 9139 8135 35 OTIS DMY RM 0 06/01/88 3-1/2" OTIS SSSV LANDING NIPPLE 1 9234, 8213 35 OTIS DMY RM 0 09/23/08 PX Plug set in Sliding , 1 I I 9319' —3-1/2"OTIS XA SLD SLV,ID=2.75" Sleeve at 9308' MD % — r 9379' -TM/SEAL ASSY R X 9395' 1—9-5/8"X 3-1/2"TW HBBP PKR, ID=2.992" ® 9436' —3-1/2"OTIS X NIP, ID=2.75" TOP OF 7"LNR 9456' — ' 9469' —3-1/2"OTIS X NIP, ID=2.75" 3-1/2"TBG,9.2#,L-80, .0087 bpf, ID=2.992" H 9502' \ 9502' —3-1/2"TBG TAIL, ID=2.992" 9-5/8"CSG,47#,L-80,ID=8.681" H 9735' I IL 9484' —ELMD TT LOGGED 07/01/88 PERFORATION SUMMARY I REF LOG: SWS-BHCS ON 05/23/88 ANGLE AT TOP PERF:38°@ 10042' I Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE I 2" 6 10042- 10052 0 04/25/09 2" 6 10062- 10082 0 07/04/08 I 3-3/8" 4 10082- 10100 0 08/09/90 2" 6 10082- 10100 0 04/09/08 9994' —I MARKER JOINT 3-3/8" 4 10104- 10108 0 08/09/90 2" 6 10104- 10108 0 04/09/08 ' 3-3/8" 4 10112- 10120 0 08/09/90 2" 6 10112- 10120 0 04/09/08 ' 2" 6 10132- 10154 0 04/09/08 5" 4 10132- 10156 0 05/31/88 ' 2" 6 10174- 10201 0 04/09/08 5" 4 10174- 10221 0 05/31/88 ' 2-1/8" 4 10190- 10201 0 08/29/98 2-1/8" 4 10204- 10221 0 08/29/98 ' 2-1/8" 4 10232- 10256 0 10/26/91 ilk 10261' SLM —FISH:THREE 2.69"WFD WRP ELEMENTS(04/12/09) PBTD H 10406' livts.tivirtt, 0.100 7"LNR,26#, L-80, .0383 bpf, ID=6.276" — 10450' �tt�tttt4 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/01/88 ORIGINAL COMPLETION 05/30/09 DAV/TLH GLV C/O(04/10/09) WELL: Z-06 06/16/01 RN/TP CORRECTIONS 05/30/09 CNJ/TLH WRP FISH(04/12/09) PERMIT No: 1880320 08/15/07 KSB/PJC GLV C/O 05/30/09 MV/TLH PERFS(04/25/09) API No: 50-029-21798-00 04/28/08 TEL/SV REPERFS(04/17/08) SEC 19,T11 N, R12E,974'FNL&3631'FEL 10/07/08 GJF/TLH GLV C/O(09/23/08) 05/30/09 DBR/TLH PERFS(07/04/08)&CORRECTIONS BP Exploration (Alaska) Z-06 Estimated Top of Down Squeeze H 2092' MI 13-3/8"CSG,68#,L-80 ID=12 41 5 — 2661' i Bottom of Schrader Reservoir(4998'TVDss) --I 5438' MD — Z-06A KOP(6030'TVDss) H 6700' MD Top of HRZ Shale(6236'TVDss) — 6890' MD 4. Proposed top of Cement — 6800' MD (2)5'perforated intervals seperated by 99' Squeeze packer 7115' MD (7170'-7165')-(7076'-7071')MD EZSV —I 9248' MD Top of Kuparuk Reservoir(6480'TVDss) — 7248' MD I Top of MLV Shale(6616'TVDss) —J 7413' MD Top of 1st cement plug(Estimated).Need Min. H 8348' MD 100'TVD lateral Cement(Annulus/Casing)below Kuparuk Low est Estimated Top of Cement(7315'TVDss) —{ 8259' MD / EZSV --I 9248' MD (2)5'perforated intervals seperated by 99' (9328'-9323')-(9234'-9229')MD EZSV --1111_1:19338' i Tubing jet Cut(Proposed)(8,222'TV Dss) 1 9358' M D — — TOP OF 7"LNR — 9456' `-- ' ' 9-5/8"CSG,47#, L-80,ID=8.681" — 9735' —A I , I PBTD —I 10406' iv vttyviv 7"LNR,26#, L-80, .0383 bpf, ID=6.276" —I 10450' 1•Ave�C�e�4v4v4 TREE WELLHEAD TOR= MCEVOY Z-o 6,- Proposed SAF _DOTES : KB.ELEV= 92' BF.ELEV= 55.12' KOP= 6700' , 11 2000' H 4-1/2"HES X Nip, ID=3.813" Max Angle= Datum MD= Datum TVD= 8800'SS I GAS LIFT MANDRELS 13-3/8"CSG,68#, L-80, I0=12.415" - 2661' 11 m ST MD TVD DEV TYPE VLV LATCH PORT DATE $ 8 DUM 9-5/8"x 7"BKR ZXP PKR H 6550' - 7 DUM 6 DUM 5 DUM 9-5/8"Baker Gen II Whipstock -1 8700' 4 DUM 3 DUM 9-5/8"HES EZSV - 6720' 2 DUM 1 DUM I 9060' - 4-1/2"HES X Nip, ID 3.813" 7"x 4-1/2" HES TNT PKR -i 9090' I CE I 9120' H 4-1/2"HES X Nip, ID 3.813" E)) 9150' - I 4-1/2"HES X Nip, ID 3.725" 4.5"LNR, 12.64, 13CR-80,Vamtop - 9160' I r L. 9160' H 4-1/2"Hanger/LTP 7"LNR,26#, L-80,Vamtop HC, ID=6.276 H 9310' A I I PACKERS I I NO# SIZE Top Depth MIN ID Minimum ID = 3.813" ® 16 4-1/2" 3.958" I I 15 4-1/2" 3.958" ® >1 14 4-1/2" 3.958" ® Zi 13 4-1/2" 3.958" ® 12 4-1/2" 3.958" ® >< 11 4-1/2" 3.958" I Li9 4-1/2" 3.958" 4-1/2"13Cr BAKER SLIDING SLEEVES(CMD), I0=3.813" 9 4-1/2" 3.958" I I 8 4-1/2" 3.958" SIZE NO# Top Depth ID DATE Xi 7 4-1/2" 3.958" 4-1/2" 9 3.813" I I 6 4-1/2" 3.958" 4-1/2" 8 3.813" ® 1:1/3:: R.0: 4-1/2" 7 3.813" ® 3 4-1/2" 3.958" 4-1/2" 6 3.813" ® 2 4-1/2" 3.958" 4-1/2" 5 3.813" 1 3-1/2" 2.992" 4-1/2" 4 3.813" IX! 4-1/2" 3 3.813" I ir 4-1/2" 2 3.813" 4-1/2" 1 3.813" I I l'BTD 11845' 4.5smik____ 11925' -4-1/2" 12.6#LNR, 13CR-80, ID=3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/01/88 ORIGINAL COMPLETION 05/30/09 DAV/TLH GLV C/O(04/10/09) WELL: Z-06A 06/16/01 RN/TP CORRECTIONS 05/30/09 CNJ/TLH WRP FISH(04/12/09) PERMIT No: 1880320 08/15/07 KSB/PJC GLV C/O 05/30/09 MV/TLH PERFS(04/25/09) API No: 50-029-21798-00 04/28/08 TEL/SV REPERFS(04/17/08) 07/03/11 RRC Z-06A Proposed SEC 19,T11 N, R12E, 97z!'FNL&3631'FEL 10/07/08 GJF/TLH GLV C/O(09/23/08) 05/30/09 DBR/TLH PERFS(07/04/08) &CORRECTIONS BP Exploration (Alaska) vii Ta > Z7 N E (� > C a) O ami CD 0) a > o HN Z = 0 °' U O j ( W co A 2 r 2 co I jai -e.::: • 0O LV z � ° &) z a) I die EDo 11111111111112 CO O V "444 i 4► © .W 4k 8 J 111111 O . -- OL � e �. L4 NAS L CO �� _ ,_ - AN 61, 1■ O w/ O 4 IP' 1, �► ,► © ., ( .. t 4► > . o , __ It0 CD L a U ;? m 0 4)C m � C7 IIII J 0 Em az � c � J •acct < m § Q co O V 2 2 In W p12 ro 6 m co < •-•45 C . >. " — (-- Q M= Cq N CO INDG E ..t. Illiftm a" Q m111:t yr N g p 5 ,,,, st_co , yg0 P COO^n^Cn,-MO,Of.-M OIC NY tOpp ONa CO CO NNar Cn-MOncn-MOn OnN Y CO COO =L O U r CO CO CO CO CO CT Of Or cn oct 0 NNN NMM MMMa'45,to aa0000[O U Zm p N NNN CV CV N CV CSI CV N N N N N M M r7 rh rh M e7 r7 h M r7 rt.;M M,M M N')rM rM M wi M M rM rM M rM"]r7 h CY 0in • . :! ' D O Z; 25 1 i iiii . t lee r. .14 03 d � Q D E.sOr�h nNrih 1.6..OrOw'>r`+)CO2<� d'Ob"COOfr000,AOO,nCO u'ir`NmN�C[ ,CNto"' MCGa tau'to',CrbD KOr"rFnN`M il C Z 1O0 3 y KZ1 -15 I O y N', m o, Q tv O-O d Or�CT,-,vC O I-CT-,7 CO CO O Na,O_co O Na CO CO Or70 n O-M 1n1 01-„"i O ONY CO O N.4. 1 O . 45 .�CO CO W CO CO O?O?CO CP 0000NCV NN N nO CO CO M„")a a a Y O v?LO,A,n CO CO ,O tt E ?_ N N N N N N N N N N N N N N N N N N N N N N N N ci N NNNNNNN Q o z € $ a Sgt .2 a O CO n 1b o, N o, ^N,<CO CON CO Of _ _ _O CO n CO Cr!N.-N n Y O CON CO - S E. o CD cd co CO a0 co O O OCT CT CT Cn Cn Oj O O O O O O O O O 7 CV CV CV CV CV CV CV[V n -4g 3 78 8 4 ga u o • < 3 I 0 v v v v r ,s LtJ F.. i a —a CO N 3 �a / K CZ 6W 3. F 1 a 3 /fl j 7 SLi L.Cr 3 i O 3 •_ ''l• O x 0 WI • 05 o z - _ O a �F. K p ¢ �\ ¢N o p N bi aOoI gN Z WW ¢ S< EEE y cnw 2 a 5 ci Oso 6 a jmYUmQ ■ - N MI IA CO I., CD •R • - Wh a=1 ! ley{ill i Q $ k g z 11111 o op En to VVV w lal i8 C=3CP r• ' I T ..0 11 ;14 ! g Z�� O CCLI:ir?T—L'-. I- < <m vr P S tRc, Y �gp l Ig1 tg, mA P_ iiiQ a _ • - PO _____ I __I MI_______ Ai= iii - 111ellor 1 • . ... p Ilr a s @ - J i * � � * ' ct R ��ii 3 -- J iiiN1i1--- i i Si i • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME L ( "0 , PTD# 7___1 Z C Development l/ Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: 7. --K.,1/z9-e_r c POOL: P'L-coao-e__- ,`/ Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 Eli i 0 N Cl) o) 0 a) n co co co L 5 c `o @ O L E T.) c 12- < Q 0 > 0 N . N ai -o -o @ ° 0 a) 0 E cE m o 0 v a s 0 s- n n 0 :2 m L Cl) W 0 "O O O w (-1. 7 7 .c ' co L -0 E N a O ° (7) M • m usc c m a 3 o L 0 E O o L f6 C O- 1° L 3 N ) 0 CO 0 3 3 0i c a 0 .0 L° 0 -) E 0 - -`0 0 cl. 03 L i = m ao o O a o O N m u L > .D m c co 0 m Q -c • - a� 3 c 0 .o = 0 >. 3 w > ami 0 ai 3 _ 2 •.E 3 c a O 0 a .� C. c 0 0 '3 m CO ate) Cl) 0 a) @ 0 3 co = N N 0) a 0 c@ u) N E m 0 3 `) a o — (V > O .L@. > T C Q L > U CO 0 00 0 0 N 0) 0 o) N = N 3 g co o a O O In a) .(n a) N D N w n N U N N W O J N N N '0 N "O a) 01 a) @ n Cs o ° cn c 2 co a > 0 a a co E 0 `m 0 Q = L o 2 vi N ° o @ E N@ 0 Z c c° c a) < N- @ a 0 - m v @ a) } Cs J a m c m E (n N a z '� o0 0 C m 2 N 0 9 N (0 . @v N a) a 0 CO -0 OW m e a0 CO U) 0 m 0 o -o - n p �@o o) a aNi - W m O N n o - �c o 0 - o_ 00 a E -o a o O o x 0 c O N a� 0 0 0 m m E a aa)) aci o 0 0 -0 3 x' 0CD n E v N 9 ° 't p M co ac) _o c 0 U D �. a) Et F O •C U = N Q O. . N - N E V) �- D. C o •c a a) (d 0 N c T 3 3 N .c a) N a) x c a a iiito . c N a) - CD L w 'N aj 0 0 x 0 0 >@, co ° Q a) m co ° �o Co .S O) o •c a > @ n a 0 0 cC N Qo Q m N .L- N N N .N .� ° 3 a) C C a O l(') 'o N N w L a) E 0 m a0i of o o U' co co o c m >. -o co co a E o@ o m z O x n ca N O .� 0 a) co N -� N a) - N ,_ Cl c 0 3 N .0 C 0 ' c 0 3 a• -0 CO 030 0 0 E 0 C) .522 a o ° -o E 0 a) ami O m m n o o o - N o a>) m Q N ap a 0 0 2 W Q a 0 w o r a < O U) co c U) R M n. > 2 2 x < N E a C N a CL o AI ce o W N N (n a M < < aa)) aN) aa)) aa)) 0 co 0 0aN) aa)) aN) aa)). aa)) a.) aa)) aa)) < < < < U) N N 0aa)) < aa)) aa)) N 0aa)) a.) aa)) O aa)) < < < Q z z >- >- >- >- >- >- >- >- >- >- >- >- >- >- >- z z z z >- >- >- >- >- z >- >- >- >- >- >- >- z >- z z z N. 0 N U N o c @ a) a) E E 3 - E a) O U U j c N @ 7 aC L o -1- a 3 E 3 0 (o O @ M N @ ,>_" U ,---, U_ C N E O -' O Z w c E m W Q csi @ N co co co O @ E (n O 1 No a- O O N n N x J 7. O` T C 01 N @ C. "O co N @ 1 D Q a a) 4 c o N cNi 173 o J 0 0 0 aet) d c' N ° 0 Ih aLnin o :> 00 a N 11 m ,o C. L O U (O N. >• = N 0 a O 06 E a) (0 'E o M -o O N N N 'I zri O) Z 3 U) C O) L C N d- Ln 7 < co co a) N m .. W _ 4 O C' -o 0 a) C' @ a) 0_ n O 0 a) m 0 00 O) a) N a N C C a) C o N p Q °•) E E = C c E @ a) o c c 'C > F c o - ° o c 0 .E 0 �- N r n c c U + C 0) N O = Y o o a 0 o c 0 c ° O) 7 0 'a a s 0 0 a o . '3 O > co >. 0 Q o a o a) a) c c > o ° a@ Y 0 0 0@ o .@ '@ CD Q .@ a o o Cl) .�� E Q 0 0 0 D o 0 o c m - n ° o - E 3 0 0 a) L m 3 w 0 Et a Q co o 0 C C m@ 0 L _c -0 (0 m 0 -o @ E m 0 @ .- a) rn o N o n 3 0 c o T 3 c E o z t c c N N Q Q@ 3 3 N , 0 U U - o @ `) o 0 o y `) n a -- 0 o S o t > ° W 0 O p p c C -o "� co 0 N .p_ 'o 'o ° 'E p p a) O O C Q N -o N @ O o) C -0 n N 3 a) a I- O a (0 0 a`) a`) @ -0 ° ° > > n c o _ 0 o E 0 E L o N c 0 0 0 ° 0 0 v n a) 0 0 0 o co E rn o CO 0 .6 Q N L @ @ O O m a) '.r= d N co n L a) o) Q@ @ @ CO 0) @ O 2 °) C U 3 -, f, N -o U E @ @ @ .� c 0 0 N@ a 0 T -o x c N -0 .N o n 0 rn o TD .0 -o a -o - E. N-E 0 a) 0 Cl) -3o r c n (0 Cl)te > o) c .ccc a) Q 0_'- L.. c ° (0) ° _c .0 Cl) T c E jr_ XN @ E a) a) a) a) @ -� O L C C :c a) 0 00 '0 0 N = - 3 "O 0 N C 0 U @ C a) C O @ > 0 0 m m m o @@ E iv 3 0 0 0@ fa a) a) = Cl) -0 E@ = C _0 co N@ 0 c 1- w e C 0 0 0 0 C @ `0000 0 0 N o . a) o o — 0 , -0 @ m vi a E - N c 0 ° o to a 0 0 0 .� .� io m _° a) 0- p 0 > > 3 c a a 0 c w w Y ,c 0 t n E 0@ as Y m o a) a@i .E 5 c 0 •v n n a`E) aa) m 0 3 2 o = 2 2 2 ca 0@ -o . = 0 0 = 0 0 a0E co i a`) ms •a a) o 0 0 z 0_ _I D (n O O a a o ¢ a 0 u) 0 0 0 0 ¢ Ci < w o co co 0 o 2 a 0 co (n c0 I n r O N M V LI) (0 W O) O N M A (f) (O N- a0 0) O N M A (O (O ',--, CO O) V = N CO V co a0 r 00 0) �- N N N N N N N N N N (`•) c•) C'') M C') C') C') M M C') U NN N •• O0 O C2 O C m a R U O ce co o 0 co 0 O) o M O)'y N 05 N N O co W O (`v co a co co cCL Csi E J N N aa) rn U E J rt a 0 a (n C a 0 0 W o EE Q uu-) a aC7 0 a (an < < W Q 0 Q