Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout182-030 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 • .. ,~. January 1, 2010 +~'~•'~~~" .J~!°! `~ J ~ ~ ~' ~g~_~~~ Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 15 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 15 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-15 narp• nvns/~n Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 15-016 2042570 50029206960200 NA Sealed NA 15-026 2060720 50029206970200 NA Sealed NA 15-03 1820300 50029207220000 NA Sealed NA 15-048 2071380 50029207260200 NA Sealed NA 15-05A 1950340 50029207310100 NA Sealed NA 15-06A 1982540 50029207420100 NA 6.7 NA 40.8 11/7/2009 15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009 15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009 15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11 /11 /2009 15-10A 1880850 50029205010100 NA Sealed NA 15-118 2041460 50029206530200 NA Sealed NA 15-12B 2060870 50029206650200 NA Sealed NA 15-13A 1991240 50029206450100 NA Sealed NA 15-14A 2042220 50029206820100 NA Sealed NA 15-15C 2081820 50029206910300 NA Sealed NA 15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009 15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009 15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009 15-19A 1990990 50029218290100 NA surface NA 15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009 15-21A 1990290 50029205030100 NA Sealed NA 15-22 1800970 50029205090000 NA Sealed NA 15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009 15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009 15-258 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009 15-266 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009 15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009 15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11/9/2009 15-298 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009 15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11!11/2009 15-318 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009 15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009 15-338 2031940 50029224480200 NA 1.6 NA 10.2 11 /29/2009 15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009 15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009 15-36B 2060730 50029224800200 NA 1 NA 5.1 11/10/2009 15-376 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009 15-38A 2030160 50029224960100 NA Sealed NA 15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009 15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009 15-418 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009 15-426 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009 15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009 15-456 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009 15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009 15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009 15-488 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009 15-498 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009 STATE OF ALASKA ALASI~ OIL AND GAS CONSERVATION ( ~MISSION REPORt OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate , , Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1323' FNL, 262' FEL, Sec. 22, T11N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic Service I i 6. Datum of elevation(DF or KB) 63 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number/approval number 82-30 10. APl number '- 50-029-20722 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9310 feet 8977 feet Plugs(measured) PBTD Tagged @ 9264' MD (7/8/93) Effective depth: measured true vertical Casing Length Conductor 110' Surface 2610' Production 9239' 9264 feet 8928 feet Size 20" 13-3/8" 9-5/8" Junk(measured) Fish in Tbg @ 4985' MD Cemented Measured dePth 400 SX permafrost II 110' 2500 sx Fondu & 400 sx PFC 2673' 700 sx CIG 9302' True vertical deptt 110' 2673' 8969' RECEIVED Perforation depth: measured 9214-9244' NOV - 7 1994 At~ska 0il & Gas Cons. Commission true vertical 8881-8911' Anchorc,,e Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, Tbg to 8800' MD; 3-1/2", 9.3#, 13 CR 80 from 8800' to 9218' MD Packers and SSSV (type and measured depth) Baker SB-3A Packer @ 8934' MD; Baker "D" Packer @ 9137' MD; Camco TRSV @ 2270' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Shut In Tubing Pressure Subsequent to operation Shut In 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 1250/15 GSS cc: KZ, JWP Title Engineering Supervisor Date SUBMIT IN DUPLICATE 15-3 DESCRIPTION OF WORK COMPLETED MARASEAL GEL SQUEEZES OF CRETACEOUS LEAK IN 9-5/8" CASING I 1/21/93: Ran a Leak Detection Log that indicated a leak was present in the 9-5/8" casing at approximately 5800' MD, to the Cretaceous. Shut in the well. 2/19194: Ran a PX Plug & set'in the tubing tail at 9109' MD. 3/20/94: A Maraseal Gel Squeeze of a 9-5/8" Casing Leak to the Cretaceous was performed as follows: MIRU & PT equipment. Pumped 225 bbls of Crude down the 3-1/2" x 9-5/8" annulus, followed by 5 bbls of Methanol, followed by 66 bbls of Hot 1% KCL Water, followed by Shutdown. RIH to latch & POOH w/OGLV from 6888' MD, then resumed pumping 30 bbls of Crude down the tubing, followed by 266 bbls 1% KCI Water, followed by 299 bbls of Maraseal Gel. Circulated the Gel past the Cretaceous leak at 1 - 3 bpm & took Gel returns from the 9-5/8". Followed Gel w/41 bbls of Crude displacement, followed by 5 bbls Diesel, followed by Shutdown. Left Gel plug in the tubing & casing at 5300' to 6900' MD, & placed 183 bbls of Gel behind pipe into the Cretaceous with no bump in squeeze pressure. Rigged down. 3/27/94: RIH & tagged the Gel plug at 5050' MD. 3/28/94: Performed an MIT on the 9-5/8 annulus to 1000 psi/30 minutes; passed. RIH w/CT & jetted Gel from the tubing to 8800' MD. POOH w/CT while displacing tubing w/Seawater & Crude. RD. 3/29/94: PT tubing OK to 1000 psi / 30 minutes, with valve Station #3 still open. 3/30/94 - 3/31/94: Pressure monitor showed IA flow had reestablished at 2 - 3 bpm. 4/1/94: RIH & set a DGLV in Station #3 at 6888' MD, & POOH w/PX Plug from tubing tail. RECEIVED ~OV -? 1994 OiJ & Gas Cons. Commission Anchorc.? 5/13/94: RIH & set an XX Plug in the nipple at 8804' MD, then latched & POOH w/Station #2 DGLV from 4947' MD. Pumped 100 bbls of 9.8 ppg Brine Water down the 9-5/8" annulus, followed by 3 bbls of Diesel, in preparation for a Gel Resqueeze of the Cretaceous Leak (above), but Shutdown before pumping any Gel due to crosslinker problem. Rigged down. 6/1 0/94: MIRU & PT equipment. Pumped 70 bbls Meth Water down the annulus to displace Schmoo, followed by 99 bbls of 9.8 ppg Brine Water, followed by 96 bbls of 9.7 ppg Maraseal Gel to Resqueeze the Cretaceous Leak (above), followed by 162 bbls 9.6 ppg Brine Water, followed by 33 bbls Meth Water, followed by Shutdown. RIH & set a DGLV in Station #2 at 4947' MD & POOH. Pressured up on the annulus 3 times to 1000 psi to obtain a Gel squeeze on the Creataceous. Final pressure bled to 550 after holding 30 minutes. Attempted pulling XX Plug & lost pulling tools & wire in the well. Rigged down. 6/1 2/94 - 9/1 6/94: Jetted Gel from wellbore to 5650' MD. Performed fishing operations & retrieved 95' of wire. Left remaining tool string fish with 3680' wire stuck in the tubing at 4985' MD. Future Rig Workover & Sidetrack options are currently being evaluated. ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 01-04-94 REFERENCE: ARCO CASED HOLE FINALS 11-23-93 Perf Record IO~O .~11~ 20 ,Run 11-20-93 Prod 11-27-93 Prod Profile [5~,a 11-19-93 Inj ~offie/~,~ )~e~l~l ~ R~ 11-11-93 ~ Detect/GRJ ~tl [Ytm~)iCL R~ 11-22-93 ~od ~ofile/trE~ ba~.},_'~mR~ 11-13-93 Pe~ Record li~~ I~O R~ 11-20-93 SBT/GR/CCL ~t~0-i~q~ R~ 11-20-93 GR/CCL ~] i~,;~lt'~ R~ 11-17-93 CNLICi' ) ~'9~ ~ i~L'~C R~ 4-30~ 11-13-93 Perf Record ~0C ~i~,c ~ ~ R~ 5-06 11-27-93 ~od ~ofile !~") ! 5-12 11-27-93 Perf Record '~'~!: ~ c~ R~ 5-26 11-27-93 Perf Record ~ ,: ~.~ -~j ~.;~ ~ R~ 1, 5" 5-31 11-28-93 Perf Record ~C~J '- ~¥~ R~ 1.5" 6-12A 11-12-93 Perf Record !~f~ ~c - ~J~' R~ 1.5" 6-18 11-17.93 Packer Setting Re~ R~ 1, 6-22A 11-16-93 Perf Record la~o ~t~6~ R~ 1, 5" 9-03 11-20-93 ~ DeteCtl~{7~il6~lC~ R~ 1. 13-28 11-16-93 D~l B~st TDT-P/~ R~ 1. 14-02 11-15-93 TBG Cutter ~00 14-04 11-16-93 Packoff GLM 14-ia ll-l~-~s ~od ~om,~l.r~)?~l ~~ 1, 15-03 11-21-93 ~- Detect/~ 17-13 11-20-93 Pe~ Re~ord~0~ 10~ 18-23A 11-17-93 USIT{I0~ ~olor,~ 18-29A 11-23-93 Perf Record q~-qS~ R~ 1, PleaSe sign and return the attached copy as receipt of data. Have A Nice Day! John E. DeGrey ATO-1529 1, ~' 1, 5" '7'~ 1, ~' 70 -I 1, ~' 1, ~' 1, ~' 1, 5" 1, 5" 1,5" ~'~r- , .~, 1, 5" Sch Sch Sch Sch Sch Sch Sch Atlas Atlas Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch APPROVED Trans# 94004 # CENTRAL FILES # CHEVRON # BPX # STATE OF .AT.&SKA # PHILLIPS # ANO8 GEOLOGY # EXXON # MOBIL * The corrected API# for 18-29A is 50-029-22316-01 ~7 ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 8-10-93 REFERENCE: ARCO ~ED HO~0~ FINALS ~l~_~__2- 21  -36 -36 4l 7-17-93 7-25-93 7-15-93 7-20-93 7-24-93 7-18-93 Dual Burst TDTP Perf Record USIT Color Perf Record Perf Record Run 1, Rim 1, 5 Rim 1, R~ 1, R~ 1, 5" Sch CNL ~S~-~o-lo~as Run 1, 5" Sch l~ *__~4-16 7l 19'93Dual Burst TDTP :'z°°- t~~ 1, 5" Sch ~~---'440- 7-22-93 Leak Detect zso-fs~o Run 1, 2"&5" Sch ~-~_~.]5-1 7-23-93 Perf ReCord ~5-h%~% R.n 1, 5" Sch .~_~.~9-29 7-22-93 Prod Profile l~0~-I0s~5 Run 1, 5" .: Sch ' ~:f~9-32 7-22-93 Prod Profile Io~co-ii,aS Run 1, 5" ] [ ' [ ch ~~1_ 1-27 7118-93 ~:.! B~t ~ R~ 1, 5" I~:~ - !- 4-va ~ B~t ~ R~ 1, 5"'z~'~cn~h I~~5-3 ;-14-93 ~ Brat T~ R~ 1, 5''i~-q~c- 5-4 7-24-93 ~ Brat ~ R~ 1, ~cn ~CH ~~5-13 7-24-93 C~ R~ 1, 5"~%~ch ~~J5-14 7-25-93 C~ Ioq%-xL~ R~ 1, 5" ~h ~j6-[t 7-26-93 ~ucflon ~ga~i~~.n 1, 2"&5" ~h ~/~7-3 7-20-93 ~ucflon ~g R~ 1, 2"&5" Sch PI~ sm ~d retm?e 't~ch~ c°py yeceipt °f~. /~.. RECEIVED BY.__ /'i l'/[ ,}: ' 1 ~ve A Nice ~y! - ~:' . '~'%:/(;. " ~n~ W~ce APPR VE ' ' ' ' ATO- 1529 ~s~ 93~2 ,/ CENTRAL FILES CHEVRON D&M CLINT CHAPMAN EXXON MARATHON MOBIL # PtHLLIPS PB WELL F~ R&D # BPX ... # STATE OF ALASKA TEXACO The correct bottom logged interval for 4-16 is 11,507 feet. ARCO Alaska, Inc. ( Post Office Bo'X 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 August 11, 1993 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in triplicate are multiple Application for Sundry Approvals on the following Kuparuk wells. Well 1G-01 Action Change Approved Program Anticipated Start Date September 1993 If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Engineer Kuparuk Petroleum Engineering Attachments RECEIVED AU G 1 2 199,,z Alaska 0il & Gas Cons. Commissiu" Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA COMMI,~ION OIL AND GAS CONSERVATION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend w Operation Shutdown w Re-enter suspended well __ Alter casing __ Repair well _ Plugging ~ Time extension _ Stimulate m Change approved program X Pull tubing __ Variance m Perforate ~ Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) '~,'~ Development _ ARCO Alaska. Inc. Exploratory _ RKB 91 fe 3. Address P. O. Box 100360, Anchorage, AK 99510 Stratigraphic _ Service X 4. Location of well at surface 895' FSL, 313' FWL, Sec. 29, T12N, R10E, UM At top of productive interval 1313' FNL, 276' FEL, Sec. 31, T12N, R10E, UM At effective depth 1803' FNL, 500 FEL, Sec. 31, T12N, R10E, UM At total depth 1833' FNL~ 520' FELr Sec. 31~ T12Nr R10E~ UM 12. Present well condition summary Total Depth: measured 7 9 7 0 true vertical 7 0 0 2 feet feet 7. Unit or Property name Kuparuk River Unit 8. Well number 1G-01 9. Permit number 82-30 10. APl number so -029-20805 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Plugs (measured) None Effective depth: measured 7 8 5 8 feet true vertical 6 9 1 4 feet Casing Length Size Structural Conductor 8 0' 1 6" Surface 2 21 4' 10 3/4" Intermediate Production 79 2 5' 7" Liner Perforation depth: measured 6970'-7019', true vertical 62O9'-6248' Tubing (size, grade, and measured depth) 3.5", 9.3#, J-55 @ 7216' Packers and SSSV (type and measured depth) Junk (measured) None Cemented Measured depth 324 Sx AS II 80' 1000 Sx AS III & 2238' 250 Sx AS I 595 Sx Class G & 79 5 6' 250 Sx AS I 7063'-7104', 7297'-7301', 7311'-7329' 6284'-6316', 6470'-6473', 6481 '-6496' True vertical depth 80' 2235' 7000' RECEIVEID PKR's: Baker HB-1 @ 6824' & Baker 2-B @ 7181'; SSSV: Camco TRDP-1AE @ 1718' 13. Attachments Description summary of proposal X Detailed operation program _ BOP sketch Convert well from oil production to IWAG injection. 14. Estimated date for commencing operation 15. Status of well classification as: September 1993 Oil _ Gas Suspended 16. If proposal was verbally approved Name ~{,approver Date approved Service IWAG Iniector 17. I her~3~zert~ ti~ the~ fore~lo~ true and correct to the best of my knowledge. I ~ ,,J' /I Sic~ned ~ vv'-'-' ~,.J.- [Ax' I,"' I,.----- Title .~o~' m~:Trto~'~ne~'' Anchorage FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test _ Location clearance __ Mechanical Integrity Test ,~ Subsequent form require 10- ~0~"/ Approved by order of the Commission Form 10-403 Rev 06/15/88 IApproval No. I Approved Copy Returned _ Commissioner Date ~//2./~ '~ SUBMIT IN TRIPLICATE F Attachment I ~ Conversion to Water Injectio Kuparuk Well 1G-01 ARCO Alaska requests approval to convert Well 1G-01 from an oil producer to a water injector. This well will be operated as a Class II UIC well in compliance with Area Injection Order No. 2. Water will be injected for the purpose of enhanced recovery into the Kuparuk interval between the depths of 6209' and 6496 TVD'. This interval correlates with the strata found in ARCO's West Sak River State Well No. I between the depths of 6474' and 6880' as authorized in Rule 1 of this injection order. A Mechanical Integrity Test will be performed before injection is initiated and every four years thereafter, in compliance with Rule 6 of this order. This well's injection volumes, average injection pressure, and average annulus pressure will be reported to the AOGCC monthly. RECEIVED AU G 1 2 1993 Alaska Oil & Gas Cons. ~omrniss~ Anchorage ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 10-9-92 REFERENCE: ARCO M&GNETIC TAPE(S) WITH LISTINGS 1-9 ~ 5W~ 7-26-92 1-1~ ~/.ciz/? 7-26-92 5-12 ~ r~/~ 7-3 0-92 7-16~~ 2-17-92 7-34 ~ ~ 2-18-92 9-36A~ 2-29-92 15-3 ~/~ 5-31-92 18-~ ~~7-28-92 CNL/GR R-- I Job#5583 CNL/GR R,m I Job#5582 PSGT R-- I Job#L73957-4 CNL/GR R,m I Job#5587 CNT R~_m I Job#L73988-2 CNT R-n I Job#L73989-3 PSGT' R-n I Job#L75976-X CNTH' Run I Job#92345 CNL/GR Run I Job#5584 Please sign ~d return the attached copy as receipt of data. RECEIVED BYff~~~~ Have A NiCe Dayi Sonya Wallace ATO- 1529 APPROVED_ffffffm_ Trans# 92232 Atlas Atlas HLS Atlas HLS HLS HLS Sch Aths # CENTRAL FILES (CH) CHEVRON D &~M BOB ~AS (OH/GCT) # EXXON MARATHON MOBIL This is a corrected tape copy. # PI:iTT.T.~ PB WELL FH,F~ R&D # BPX # STATE OF ALASKA TEXACO RECEIVED OCT 1 5 1992 Alaska Oil & Gas Cons. Commi~lon Anchorage 1. Operations performed: Operation shutdown Pull tubing x 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1323' SNL, 262' WEL, SEC. 22, T11N, R 14E, UM At top of productive interval 1443' SNL, 1316' WEL, SEC. 21, T11N, R14E, UM At effective depth 1427' SNL, 1849' WEL, SEC. 21, T11N, R14E, UM At total depth 1426' SNL, 1849' WEL, SEC. 21, T11N, R14E, UM 12. Present well condition summary Total depth: measured 9310 feet true vertical BKB 8977 feet Stimulate Plugging Perforate Alter casing Repair well Other 5. Type of Well: 6. Datum elevation (DF or KB) oevaopment .X__ KBE = 63 feet Explorata7 Straligraphic 7. Unit or Property name se~ce Prudhoe Bay Unit 8. Well number 15-3 9. Permit number/approval number 82-30/Conservation Order 258 10. APl number 50- O29- 2O 722 11. Field/Pool Prudhoe Bay Field~Oil Pool Plugs (measured) Effective depth: measured 9276 feet true vertical BKB 8939 feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length Size Cemented Measured depth True vertical depth RECEIVED JUL 2 8 1992 , !aska,Ojl & Gas Col s. uommission nchorage Tubing (size, grade, and measured depth) 3-1/2", 9.3//, L-80 tubing to 8800', 3-1/2", 9.3~, 13CR80 from 8800'to 9218' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 9-5/8" Baker 'D' Packer ~ 9137'MD, 9-5/8" Baker 'SB-3A' Packer ~ 8934'Md 3-1/2" Camco TRSV @ 2270'MD Intervals treated (measured) Treatment description including volumes used and final pressure 14. Rec)resentative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations x Oil x Gas Suspended 17. I hereby certify ti)at the foregoil~g is true and correct to the best of my knowledge. Si~ned ~- ~.=--.,,[/- Title Drilling Engineer Supervisor Form 10-404 Rev 06/158/~ ~' Service SUBMIT IN DUPLICATE DAILY OPERATIONS(~ PAGE': 1 WELL: DS 15-3 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50-029-20722 PERMIT: APPROVAL: ACCEPT: 05/26/92 06:05 SPUD: RELEASE: 06/01/92 06:06 OPERATION: DRLG RIG: NONE WO/C RIG: DOYON 16 05/27/92 (1) TD: 0 PB: 9276 05/28/92 (2) TD: 0 PB: 9276 05/29/92 (3) TD: 0 PB: 9276 05/30/92 (4) TD: 0 PB: 9276 05/31/92 (5) TD: 0 PB: 9276 06/01/92 (6) TD: 0 PB: 9276 06/02/92 (7) TD: 0 PB: 9276 PUMP KILL PILL #2. MW: 8.5 Seawater MOVE RIG TO DS 15-3. RIG ACCEPTED @ 18:00 HRS, 5/26/92. R/U LUB. PULL BPV. R/D LUB. PUMP SEAWATER DN TBG. SHUT IN WELL. PUMP 40 BBLS LIQ CSG KILL PILL . SPOT ACROSS PERFS. RIH W/ SPEAR. MW: 8.5 Seawater SPOT KILL PILL. MONITOR WELL. WELL DEAD. N/D TREE. N/U BOPE. TEST BOPE. PULL HGR TO FLOOR. PULL TBG FREE. CBU. POOH, L/D 5-1/2" TBG. RIH W/ SPEAR. PREPARE TO PUMP KILL PILL MW: 8.5 Seawater RIH W/SPEAR, P/U DP, SPEAR INTO PKR @ 8662', CBU, GAS PRESENT CIRC OUT GAS, POH W/PKR, HUNG UP @ 8602', CBU, RIH W/DP, CBU, GAS PRESENT, CIRC OUT GAS, WELL NOT FLOWING, MIX KILL PILL. RIH W/BIT & SCRAPER MW: 8.5 Seawater CIRC BTTMS UP, GAS PRESENT, MIX KILL PILL. SPOT PILL, WELL STABLE. POH W/PKR. MU NEW SPEAR & RIH. WORK SPEAR INTO TBG CU~, PULL PKR FREE. CIRC BTMS UP, WORK PIPE. POH. MU 8-1/2" BIT & 9-5/8" SCRAPER. RIH. RUN 8.5 GAUGE RING MW: 8.5 Seawater TAG FILL & WASH DOWN. CIRC OUT GAS. REV CIRC HOLE CLEAN. POH, MU BAKER TEST PKR & RIH. SET PKR. TEST 9-5/8 CSG. SQ PERF. REL PKR, CIRC WELL TO FILTERED SW. POH. RU & RIH, LOG, POH. RIH W/8.5 GAUGE RING, JUNK BSKT. RIH W/3.5" TBG COMPL MW: 8.5 Seawater RIH W/8.5 GAUGE RING. POH. MU TAIL PIPE ASSY & PKR. RIH W/9-5/8 PKR. TIE IN & SET. POH, SLIP & CUT DRL LINE. MU TAIL PIP ASSY, INSTL BLAST RINGS. TEST CONTROL LINE. RIH W/3-1/2" TBG & 3/8 BARE CNTRL LINE. TEST. RELEASE RIG MW: 8.5 Seawater RUN COMPLETION. TEST SEALS, CONTROL LINE, SET PKR. INSTL BPV, ND BOPE. NU FLANGE & TREE, TEST. DISPL ANNULUS TO DIESEL. U-TUBE DIESEL, INSTL BPV, SECURE WELLHEAD & TREE. DUMP & CLEAN PITS. RELEASE RIG 6-1-92 @ 18:00 HRS. SIGNATURE: (drilling superintendent) DATE: RECEIVED Alaska OJJ & Gss Colts. ~;ommJssJo~'~ Anchorag~ ARCO Alaska. Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 6-19-92 REFERENCE: ARCO CASED HOLE FINALS 7-1 5-31-92 CCL (per/) Run 1, 5" ~11-16ST 5-30-92 MAI Acoustic Filtered Waveforms Run 2, I~' ~1-16ST 5-30-92 BHC/MAI Comp. Slowness Curves Run 2, ~'&~' ~11-16ST 5-31-92 PFC-GR Run 1, ~' 12-6 5-31-92 Tubing Cutter/Goex Segmented Run 1, ~' 14-11 6-7-92 CC~ (per/) Run 1, 5" 14-18 5-24-92 Vertilog Run 1, 5" 15-3 5-31-92 Packer Setttn~ Run 1, 5" Atlas Atlas Atlas Atlas Atlas Atlas Sch Atlas Atlas Atlas Atlas Atlas Sch Sch Please sign and return the attached copy as receipt of data. .ECEIVE Have A Nice Day! {~ ~5 (.~ k i"~ E !o Sonya Wallace .~ .~ ~_ AT0-1529 Alaska 0it & ~as Con~. Commissi~n Anchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO * The correct API# for 14-9B is 50-029-20534-02. ARCO Ahska, Inc. P.O~Box 100360 Anchorage, Alaska 99510 DATE: 5-29-92 REFERENCE: ARCO CASED HOLE FINALS ~31' 6.14~/ 5-19-92 /...?o 9-8 ~// . 5-16-92 5-17- ~~.~i5~3 ~ j5-24-92 ~/~iZ'~ 'i~[~'-/ 5-23-92 I 16-27 5-13-92 ~l~ 16-27 5-13-92 Tubing Cutter R-- 1, 5" Sch PFC/GR Run 1, 5" Arias CCL (BP Correlation) Run 1, 5" Atlas Tubing Cutter R.n 1.5" Sch Prod/Temp/Pres/Spin Trap Run 1.5" Sch CBT Run 1.5" Sch CET Run 1.5" Sch Please sign and return ~ ,ttache~~aspipt of data. RfCflVED RECEIVED BY___~ 8 ~992 ~Oil & 6a~ ~?- Comrni,ssior' Ha.ve ANlce Day! /t~ Ancho.~,~ge , - Sonya W-ii-ce APPROVED ATO- 1529 Trans# 9211~-~ # CENTRAL FILES # CI~VRON D&M - # 'EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PIHLLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO Drill Site: 15 Well: 3 K-VALVE DESIGN Fri Jul 12 08:43:42 1991 COMMENTS: DOME SET PRESSURE: 855 PSIG @ 60 DEG F FTP @ CLOSE (PSIG): 1100 PSIG K-VALVE CLASS (A,B,C): A FTP @ closure is set a little iow to allow the well to be opened up further. CC: C.P. FARMER / W.D. COOPER K.M. KENNEDY / L.D. LASH B.G. HARRIS / T.J. BRASSFIELD ENGINEERING WELL FILE PRB 24 PRB 20 PRB 13 G.S. WALZ ATO 1546 DESIGNED BY: Matt Maguire Printing contents of current screen - wait for message to clear STATE OF ALASKA ALASKA ('~ AND GAS CONSERVATION cqr llSSlOU 0 ..~ J (~ I r~ ~ REPORT O1: SUNDRY WELL OPErlATIONS 1. Operations performed: Operation shutdown Stimulate ~ Plugging ~ Perforate ~ C o r r e c t ed Pulltubing Alter casing Repairwell ~ X Perforation 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1323' FNL, 262' FEL, Sec. 22, T11N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM 5. Type of Well Development Exploratory Strafigraphic 6. Datum of elevation(DF or KB) 63 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number/approval number 82-30/90-401,900-327, 90-474 10. APl number 50 - 029-20722 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9310 feet Plugs(measured) 8977 feet Effective depth: measured true vertical Casing Length Conductor 110' Sudace 2610' Production 9239' 9276 feet 8939 feet Junk(measured) Size Cemented 20" 400 sx Permanfrost II 13-3/8" 2500 sx Fondu & 400 sx PFC 9-5/8" 700 sx Cl 'G' Measured depth True vertical depth 110' 110' 2673' 2673' I ,EEIVE 5"' Perforation depth: measured 9090-9110'; 9214-9234'; 9234-9244' true vertical 8757-8777'; 8881-8901'; 8901-8911' J U L - 2 1991 Alasl{a 0ii & Gas Cons. Commission Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9137' MD; 4-1/2", 12.6~, N-80, PCT tail @ 9138' MD Packers and SSSV (type and measured depth) BOT RHR packer @ 8665' MD; BOT Wolverine packer @ 9129' MD; 5-1/2", Camco Bal-O SSSV @ 2211' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Representative Daily Avera0e Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation Subsequent to operation Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Title Sr. Area Operations Engineer Date ~_~"z ~./. SUBMIT IN DUPLICATE SUN/nb ARCO AL. ASKA, INC,, F'.O. BOX t0(')360 ' ANCHOI:4AGE, ALASKA [)ATE:: 5-24-9t REF'ERFNCE' ARCO CASED HOI_E FINALS 3--6 4-.-20-9t 3-t t 4-t 6-9t 3-t 2 4-i 9-9t 3-t 4 4-')~-9t,..,.,. 3-'23 4-..i 6-'9i i 4-5 4'-2¢-9 l t 4'-i 4 4--S'F~-gi i :~'"3., m..-26-9i, ... i5-6 4-"29-9i t 6-7 4--2~-9 i t 6-i '~ ~ 4-27-9i i 8-t I 4'-29-9i IN J, F'F:OF, INJ, F'ROF, INd, F'ROF,, PROD, F'ROF, GAS ENI'RY GAS LIFT IN J, P ROF", PROD, F' F;,'O F' ,, F'ROD, F'F;,'O F:', GAS I_IFT F'ROD, F:'I:;~Oi':. TEMP, RUN i ,.~- RUN t , 5" RUN i , 5 F:UN i,., RUN t , 5 RUN t, 2'&5' RLJN t, RLIN t, 5" F,'tJ N i ,_,':<" RUN RUN t,.;':;'" RUN C A H C; 0 CAbiCO CAHCO CAMCO · ~ · · ...,, ... [, A f'! U U CAMCO C; A M C 0 t:: A M C: 0 C A H C 0 C A H C 0 C A Pi C 0 CAMCO F'LEASF SIGN AND RETLJRN TFIE ATTACHED COPY AS RECEIF:'T OF DATA, HAVE A NICE DAY! $ONYA WALLACE ~;' '.,,1'" ~" ' "-"';'~' "' ' ~' F RC. V E:. I) ATO-i 529 TRANS~ 9 .i;,,: .... DISTRIBUTION ' "'~" ......... CENTRAl_ FILES "" C FI E V R 0 N 'Ir D & M · ..'"' EXTEN.S'ION EXI::'LOF;:ATION ~ EXXON ..... i'i A R A I'H 0 N · "' MOBIL "lr F'FIII_L. I F'S F'B WELL. I::'IL.E$ R & D '~: B F' X $1'ATE OF ALASKA TFXACO STATE OF ALASKA t" 0 ~ ALASKA/'". AND GAS CONSERVATION C~ /IISSION REPORT' ,F SUNDRY WELL OPERATIONS Operation shutdown Stimulate X~ Plugging Perforate X Pull tubing Alter casing Repair well ~ Other X 1. Operations performed: 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1323' FNL, 262' FEL, Sec. 22, T11N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth 5. Type of Well Development Exploratory Stratigraphic 6. Datum of elevation(DF or KB) 63 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number/approval number 82-30/90-401,9C, -327, 90-474 10. APl number 50 - 029-20722 11. Field/Pool Prudhoe Bay Oil Pool At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM 9310 feet 8977 feet Plugs(measured) 12. Present well condition summary Total depth: measured true vertical Effective depth: measured 9276 feet true vertical 8939 feet Casing Length Size Conductor 110' 20" Surface 2610' 13-3/8" Production 9239' 9-5/8" Junk(measured) Cemented Measured depth True vertical depth 400 sx Permanfrost II 110' 110' 2500 sx Fondu & 400 sx PFC 2673' 2673' 700 sx Cl 'G' 9302' 8969' measured 9214-9234'; 9234-9244' true vertical 8881-8901 '; 8901-8911' R'E .EIVED Alask~ 0it & Gas Cons. C0m~'~ss'to~ Anchorage Perforation depth: Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9137' MD; 4-1/2", 12.6#, N-80, PCT tail @ 9138' MD Packers and SSSV (type and measured depth) BeT RHR packer @ 8665' MD; BeT Wolverine packer @ 9129' MD; 5-1/2", Camco Bal-0 SSSV @ 2211' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation Representative Daily Averaae Productioq er tniection De, ta OiI-Bbl Gas-Md Water-Bbl Casing Pressure 897 6696 0 3479 18923 0 Tubing Pressure 2192 1304 14. 16. Status of well classification as: Oil X Gas Suspended Service 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Date 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 702 MJB/RAC c: D. Warner, ATO-1479 SW JWP SUBMIT IN DUPLICATE DS 15-3 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE, TUBING PATCH, & ZONE I FRACTURE TREATMENT 5120190.' MIRU CT & Cementing Equipment. PT equipment to 4500 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 45 bbls of cement, squeezing perforations at: 9144 - 9174' MD (Z1B) Ref. Log: BHCS 3/12/82. 9180 o 9200' MD (Z1B) 9214 - 9234' MD (Z1B) Placed a total of 11 bbls of cement behind pipe at 3500 psi maximum squeeze pressure. Contaminated cement & reversed contaminated cement out of wellbore. POOH. RD. 6121190: Reperforated: 9214 - 9234' MD (Z1B) Ref. Log: BHCS 3/12/82. Added perforations: 9234 - 9244' MD (Z1A) Ref. Log: BHCS 3/12/82. 1/12191: RIH & set a 5.5" OD tubing patch assembly from 8987' to 9009' MD. POOH. RD. 2/27/91: MIRU & PT to 5000 psi. through perforations at: Ran Temperature log, then pumped a Perforation Breakdown Treatment 9214 - 9244' MD (Zl) Ref. Log: BHCS 3/12/82. Pumped: a) 120 bbls Gel w/120 ball sealers, @ 15 bpm, followed by b) 216 bbls Seawater, @ 15 bpm, followed by c) Shutdown. ISlP @ 2100. Resumed pumping: d) 220 bbls Seawater, @ 16 bpm, followed by e) Shutdown. ISlP @ 2200. Surged well. Pumped Meth/Water. Ran Temperature logs. Rigged down. REEEiVED MAY 2 0 t99 Alaska Oil & Gas Cons. CommiSSiOn Anchorage 3/1/91-' MIRU & PT to 7000 psi. Pumped a Propped Fracture Treatment through perforations at: 9214 - 9244' MD (Zl) Ref. Log: BHCS 3/12/82. Pumped: a) 100 bbls Crosslinked Pre Pad, @ 20 bpm, followed by b) Shutdown. ISIP @ 2100. Resumed pumping: c) 250 bbls Crosslinked 40# Pad, @ 20 bpm, followed by d) 162 bbls Cross Linked Slurry, w/proppant concentrations of 2 - 12 ppg, followed by e) 150 bbls Flush. Shutdown. Placed a total of 35,400 lbs of proppant into the formation. Rigged down. Placed well on production with N2 lift & obtained a valid production test. ARCO ALASKA, INC. F'.O. BOX iGO36e ANCHORAGE, ALASKA 995t8 DAI'E: 4-23-9~ REFERENCE: ARCO CASED HOLE FINALS 2-'2 4-~ 2-9~ COLLAR/F'ERF 2-i 3 3-25-9~ PRODUCI'ION 3-5 4-2-9t TBG CUTTER 4--i 3-22-9~ PROD PROFILE/PITS 4-6 3-24-9i TEHF'ERATURE 4-24 3-24'-9t STATIC TEHPERAI'URE 4-'33 3-2~ --9t F'I I'S F' O uc'rzoN ~0' ~-'.4 7 3-2~-9i. GAHHA/CCL ~'0~ 9-48 4-5-9i COLLAR/F:'ER.F t 2-22 4-i -9i COLLAR/F'ERF IQI 2-33 3-2i -9i INdECTION i3-98 3-2~-9i FLUID I.D. ' * t 4-i 6 3-i 8-9i F'RODUCI'ION ~5-3 2-27-9i PITS t5-3 2-28"9i PERF BREAKDOWN t 6-6 4- i i 59 t COLLAR/F'ERF RUN ~, 5' RUN ~, 5' F(UN t, 5' o'&5' RUN RLIN t, 5" RI. JN t, 5" RLJN t , D" RUN RUN i , 5" ebN RUN i, 5" RUN t , 5" RUN t, ~" RtJN t, 5" RUN t , 5" RI. JNt, 5" RUN t, 5' RUN t, 5" I': i... E A ~'" '" - ,.,E. ,:;IGN AND I:~ETLJRN l'Hl!= A'FTACHE:D CC)F'Y RECEI"'ED BY _~.___~~ HAVE A NICE DAY! ,~ I..IAI-.'O b. WILSON A'FO- t 529 AS REL, LIF:'-f' OF:-DATA A P F:' R 0 V E I) ..~/~tl~[. I'I:~ANS:~- 9 i A 'I'LA.¥ CAMCO Al'LAS CAMCO CAM[;O CAMCO CAMCO A'I'I_AS H R S Al'LAS AI'L.A,S' C A M C (] CAMCO C A H C 0 H R ~ FII:~S ~, Fl..AS D I .~' 1' R I B U 1' I [) N ~ CENTRAl.. FILES :..- F:'H I L.I_ I F'S ~" CHIEVRON ' PB WEI_L D & M !."( & D "" EXTEN,S'I ON IEXPI_C)RAI' I ON :~ BF'X :~ EXXON ..'~,STATE 01': H A R A T H 0 N l" E X A C 0 · ." MOBIL F' I I... E S ALA,~ I, A ARCO ALASKA, INC. F'.O. BOX i0(')360 ANCHORAGE, ALASKA DA'f'E · i -i 4-9t I:tEFERENCE' AF;,'CO CASED HOLE F'INALS' F'DI< -. i C:.(')/6R/CCL F' )) K - i C:' ~.::'/' [;' I F F, C 0 R R, PDK -" i C'(")/D I F:'F:', CORF;:, 5' I GMA CBT' CE l" PF~CKER SE'I"I"ING RFCORD F'ERF RE:COF~I,~ F'E'RF RE COl::,' D F:'E R f:' R E:C 0 R D F:' F R F' R E C 0 R' D C 0 L I... A I:( C 0 L I_ A R C: N L. COLt...AR C O I... I... A F;.'. ,/F:' Iii: R I:: $IGItA & F'LJ'RO PO R 0 RLJN t, RUN i, RLJN i , RUN t , RtJN t , RUN i , RUN i, I;:UN i , RUN i, RUN t, RLJN t, R U r,,! i, R U r.~ i, iRt.jr.~ i , f;..'t. JN t , :i.i.' !-.( A I:;: f-J t...! t,,j .[ I... ,S t.} I::' "') A ')',...."" .... i ...: ,:.. A I::' i::' R 0 V E D 'f' F;: AN $ :,",: 9i 5" #... 5" 5" .5" .,..' .... ~...' II oo..- .., A:¥L..A$ Al'LAS A'FLAS SCH SCH 5'Ct4 SIgH 5'CH SCFt 5'C1-1 AI'L.A.~' AIL. A2 ,.~ L, Ft ATLAS D i S 'FR J. B U T ]: 0 N :,~ C E:' N 'i" R A !... F:' ]: L., Ii!: $ · ,,-'"' C'. !"t E V R O N D & M · 'I,I: E: X '1" Iii: N $ I 0 N E X F:' L. 0 R A T I 0 N ~ EXXC)N H A R A l' I..t C, N ~: H 0 B il: L ~ F:' H I !.. L :1: F' S F:'B WE.I_I,.. F IL. E.$ R & D ,~'I'A't'F OF I'EX ~ C(:.I T i-'! E C 0 R R E' C 'F FZ I> A F:' I -f,': F C) R i S--.i 2 ].5' P,. 0., BOX i 00..':.~60 ANCHOt:~eAC;.E: ALASKA 9, ...:-'10 DATE' 6/27/90 REFERENCE' ARCO CA2ED HOLE FINALS 4-i 6-2t-90 £'EGMENTED BOND/GR/CCL RUN 4-i 6-2i -90 CCL RUN i i - i 8 6-8-9(''.~ PERF RUN i 2-i '7 6-2i -90 CBT F..'UN i2-i7 6-2i-9,3 BRIDGE PLUG RECORD RUN i 4-5 6-i 7-90 NO ISIE/'f'EMF' RtJN i 5.-3 6-2i -5';'0 GFi:/CCL RUN "i 5-$ 6-2i-90 PIEi';..'F RECORD F;~ljf"-! i 6- 2.~; ,.".,-2"3'--9'.":)(": E T/" F~ I:( RUN i 6-23 6-'20-90 CBT RUN i '6-'23 6-20-90 F'KI:;:. ,~';E"I"TING RECORD RUN Pt_EASE SIGN AND I:(E"f'URN 'f'HiE A'~IBOF'Y,. AS RECETPi' Ol::' DA RECEIVED BY ................... ~ ........ HAVE A NICE DAY! ;S'ALLY HOFFECKER A'I' O- 'l, 5'".-- 9 RECEIVED J u L - 2 1990 Alaska 0il & Gas COns. Commission Anchorage i) 13TR I BUl' I ON :~ CENTRAL_ F' ILIE$ ~,-'"' CIJFVRON D & M :Il: EXTENSION EXF:'LORATION ~ EXXON MAF.'.ATHON · ' MOBIL F'HILLII::'$ F'B WELL F'IL.E$ R & D BPX STATE OF' ALASKA TEXACO A 'f'L A ~.' A'i LA~: Hi..$ $CH '-'." ": L.i ,":7 C H 3 C: H 3 C: H ~-~ C H fi.' C H X C H .... , STATE OF ALASKA ALASK(' . AND GAS CONSERVATION ~-" llSSION APPLICh iON FOR SUNDRY . ROVALS 0 It 1 [ Operation shutdown Plugging ~ Pull tubing Variance Other 1. Type of Request: Alter casing Repair well Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development X Exploratory Stratigraphic 4. Location of well at surface 1323' FNL, 262' FNL, Sec. 22, T11N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM Re-enter suspended well Time extension Stimulate Perforate 6. Datum of elevation(DF or KB) 63 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number 82-30 10. APl number 50 - 029-20722 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9310 feet Plugs(measured) 8977 feet Effective depth: measured 9276 feet true vertical 8939 feet Junk(measured) Casing Length Size Cemented Conductor 110' 20" 400 sx Permafrost II Sudace 2610' 13-3/8" 2500 sx Fondu & 400 sx PFC Production 9239' 9-5/8" 700 sx Cl 'G' Measured depth True vertical depth 110' 110' 2673' 2673' 9302' 8969' REEEIVED Perforation depth: measured None (~-~' ~ ,m'¢,¢.¢~.- ~c~'"~ ~r~,~ ~.Y ~]~.~? J UN 2 0 1990 true vertical None Alaska 0il & Gas Cons. C0m~ss|0a Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9137' MD; 4-1/2", 12.6~, N-80, PCT tail @ 9138' MD Packers and SSSV (type and measured depth) BeT RHR packer @ 8665' MD; BeT Wolverine packer @ 9129' MD; 5-1/2", Camco SSSV @ 2211' MD 13. Attachments Description summary of proposal x Detailed operations program ~ BOP sketch .x. 14. Estimated date for commencing operation June 1990 16. If proposal was verbally approved Oil X Name of apl)rover Date al)prOved Service 17. I hereby ~ertify that the fore oing is true and correct to the best of my knowledge. Signed ~ Title 15. Status of well classification as: Gas Suspended Sr. Area Operations Engineer Date FOR COMMIR~ION U~l= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~-~ 4. ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Form 10-403 Rev 06/15/88 408 CMH cc: J. Gruber, ATO-1478 P1115-3]W1-3 Commissioner Approvea Cbpy Returned Date IN TRIPLICATE DS 15-3 Patch Installation Procedure P16472-Downh°le Maintenance ~ To install tubing patch assembly across a damaged gas lift mandrel at +- 9000' md. ~ Interval to be fractured (9214-9245') has not yet been perfed. The perforations are covered by the squeeze Sundry. 1. RU WLU, test lubricator, and pull SSSV. Make gauge/dummy run through 5-112" tubing to +- 9100' md. The OD of the Teledyne patch to be run is 4.490" and the overall length is +- 20'. Teledyne can furnish dummy assembly, if needed. 2. RU electric line unit, test lubricator and run Teledyne Merla tubing patch (4.490" OD x 3.750" ID). Run tie-in Icg from +- 9150' to +- 8800' md. 3. Set patch across gas lift mandrel @ +-- 9000' md ( lower station) using 3-1/4" Iti-sta e setting tool. Set top of patch in 5-1/2" pup ioint above gas lift Teledyne mu. _~_., =., c.~/ - nuo 'oint below GLM. POH and RD ELU. mandrel aha lower e~lu ,-., ..2 ,- ,~ ! 4. MIRU WLU. Test lubricator and reset SSSV. RD WLU. 5. Prepare well for preliminary frac work. SBHP: 3722 psi est @ 9196' md ( 8800' SS ) SBHT: 200o F @ 9196' md Tubing: 5-1/2", 17ppf x 4-1/2", 12.6ppf Min ID: 3.983" @ 9137' md- 4-1/2" tubing tail Tubing/casing capacity to bottom peds at 9234' BHCS = 219 bbls Hole angle at 9000' md = +- 2 o Max deviation ' 29.75 ° @ 5800' md H2S: 4 ppm 4-89 CMH RECEIVED JUN 2 0 1990' Alaska 0il & Gas Cons. Commission Anchorage (~'-" -") Alaska Inc. - Prudhoe We~ 15~ [ ~PI#: 50029-20722 ~, Well Type: Producer Spud Date: 3-9-82 Completion Date: 3-7-83 New I~! Workover I-1 Original RKB: 63' Hanger Type: Oct Gen II Hanger: 27' 'ap of Sadlerochit: 8703" Maximum Hole Angle: 29e Angle Through Sad.' 2-o Annulus Ruid: Diesel/10.2# NaBr Reference Log' BHCS 3-12-82 All Depths are RKB Drilling MD to Top of Equipment except where noted. Jewelry I 2211' 2 8573' 1 3 8638' 4 8665' 5 9129" 6 9137' 7 9138' 8 9269' ,4 5-I/2" C4m~o ~al*O SSSV Nipple: ID = 4.562' Camco DB-1 Sliding Sleeve BaT PBR Assembly BaT RI-IR Packer BaT Wolverine Packer Crossoven 5-1/2" x 4-1/2" Tubing Tail: 4-1/2" ELM Tubing Tail: Not logged Fish: 3' x 4-1/2" Tbg Tail w/DB-6 Nipple Minirnum ID: 4-I~ Tubing Tail: ID = $.9S3" 12 2 9 Casing and Tubing 13-3/8" 72e L-80 0 9-5/8" 47~ L-80 0 5-1/2" 17~ L-80 0 4-1/2" 12.6~ N-80 9137' 2673' 9302' 9137' 9138' Casing Casing PC Tubing PC Tubing Tail 11 PBTD= 9276' TD= 9310' 10 8845' 1 CA-MMIG CA Dummy R K ~ 2 CA-MMIG CA Eq-Dum RKED 12 8086-80~0 4 0 2-18-83 I"~g~: 2-18-83 ~- 4 0 2-18-83 Rig SQZ: 2-18-83 13 9(X]8-9012 2 4 0 2-17-83 ~ SQZ: 2-18-83 ~110 2 29 I~ 3-3-83 14 9144-9174 · 5-~ CTU SQZ 91~ ~ 5-20-q0 CTUSQZ JUN 2 0 1990 Alaska Oil & Gas Cons. Commission Datum Anchorage I~evi~ion Dale: ~..21-90/by.US 8700" SS = 9096' ~ Reason: CTU SQZ ~8[X]' SS = 9196" IVlD Previous Revision: 7-4-87 Well 15-3 6 5 4 '¸3 2 CO]~LED TUBINg UNIT BOP EOU l PME N~ 1. 5C)00 PSI ?" W[LLHr. AD CONNECTOR FLANG£ 2. 5000 PSI 4 1/16" PIPE RAMS, 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 JUN 2 0 1990 ka OiJ & Gas Cons. Commission Rnchoraoe~ HIRELINE BOPEOUIPHENT ii ii i i · 1. 5000 PSI 7" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIRELIN[ RAUS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF STATE OF ALASKA ALASIf .AND GAS CONSERVATION('"' llSSlOU 0 APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend ~ Operation shutdown ~ Re-enter suspended well ~ Alter casing ~ Repair well Plugging ~ Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Expioratery Stratigraphic 4. Location of well at surface 1323' FNL, 262' FNL, Sec. 22, T11N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM 6. Datum of elevation(DF or KB) 63 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number 82-30 10. APl number 50 - 029-20722 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9310 feet Plugs(measured) 8977 feet Effective depth: measured true vertical Casing Length Conductor 110' Su dace 2610' Production 9239' 9276 feet 8939 feet Junk(measured) Size Cemented 20" 400 sx Permafrost II 13-3/8" 2500 sx Fondu & 400 sx PFC 9-5/8" 700 sx CI 'G' Measured depth 110' 2673' 9302' True vertical depth 110' 2673' 8969' Perforation depth: measured 9214-9245' (Planned following 5/20/90 cement squeeze) true vertical 8881-8912' MAY 2 ~ ~990 Alaska OiJ & Gas Cons, Corn Anchoraga Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9137' MD; 4-1/2", 12.6~, N-80, PCT tail@ 9138' MD Packers and SSSV (type and measured depth) BOT RHR packer @ 8665' MD; BOT Wolverine packer @ 9129' MD; 5-1/2", Camco Bal-0 SSSV @ 2211' MD 13. Attachments Description summary of proposal X Detailed operations program __ BOP sketch X 14. Estimated date for commencing operation June 1990 16. If proposal was verbally approved Oil X Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~"'-' ~° ~ 15. Status of well classification as: Gas __ Suspended Title Sr. Area Operations Engineer Date ~//Z. ?..--/~-.~ FOR COMMISSION H~l= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- I Approval No.~ (~... ~O / Approved by order of the Commissioner Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY 393 RAC cc: J. Gruber, ATO-1478 P1115-3]W1-3 Commissioner Approved Copy Returned D ate ~'/~"/~O SUBMI~ IN 'ItRIPLICATE Drill Site 15-3 Zone 1 Fracture Treatment Preliminary Procedure ARCO Alaska Inc. proposes the following procedure: Note: ! . o . When this procedure begins, the well will have been cement squeezed and reperforated at 9214'-9245' MD (referenced to BHCS log dated 3/21/82). This work is shown under a different sundry notice. Perform perf breakdown treatment using ballsealers to open all perforations in the perforated intervals 9214'-9245'MD (referenced to BHCS log dated 3/21/82). Run temperature log to determine fluid entry points. Pump fracture treatment to above intervals using gelled water and intermediate strength proppant at 20-25 bpm. Preliminary pump schedule is listed below. 350 bbl Pad 140 bbl Slurry at 2-12 PPG 215 bbl Flush RDMO fracturing service company. Cleanout excess proppant to PBTD with CTU if needed. 5. Place well on production. 6 5 4 3 2 COILED TUB~NO UNIT B[~ EOtU ! PMENT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6"" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAUS 6. 5000 PSI 4 1/16" STUFFING BOX 3 2 HIRELINE BOP EOUIPHENT -- 1. 5000 PSI ?" WELLHEAD GC)NN£CIOR FLANGE 2. 5000 PSI WlRELIN£ RAKIS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF .... ~ STATE OF ALASKA -" 'f~ ~ ALAS~ .AND GAS CONSERVATION ( ;~ISSlON "'- APPLICATION FOR SUNDRY APPROVALS Operation shutdown Re-enter suspended well Plugging Time extension Stimulate Pull tubing Vadance Perforate ~ Othe'"--r X 6. Datum of elevation(DF or KB) X 63 RKB feet 1. Type of Request: Abandon Suspend ~ Alter casing Repair well Change approved program 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic 4. Location of well at surface 1323' FNL, 262' FNL, Sec. 22, T11 N, R14E, UM At top of productive interval 1443' FNL, 1316' FEL, Sec. 21, T11N, R14E, UM At effective depth At total depth 1426' FNL, 1325' FEL, Sec. 21, T11N, R14E, UM 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-3 9. Permit number 82-30 10. APl number 50 - 029-20722 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9310 feet Plugs(measured) 8977 feet Effective depth: measured 9276 feet true vertical 8939 feet Junk(measured) Casing .Length Size Cemented Conductor 110' 20" 400 sx Permafrost II Sudace 2610' 13-3/8" 2500 sx Fondu & 400 sx PF 'C' Production 9239' 9-5/8" 700 sx CI 'G' Measured depth 110' 2673' 9302' Trueverticaldepth 110' 2673' 8969' RECE ¥ED Perforation depth: measured 9090-9110'; 9144-9174'; 9180-9200'; 9214-9234' ~j~y 0'8 lj990 true vertical 8757-8787'; 8811-8841'; 8847-8867'; 8881-8901' Alaska 0il & Gas Cons, Commission ~ ~,nch0rag~ Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 9137' MD; 4-1/2", 12.6#, N-80, PCT tail @ 9138' MD Packers and SSSV (type and measured depth) BeT RHR packer @ 8665' MD; BeT Wolverine packer @ 9129' MD; 5-1/2"~ Camco Bal-0 SSSV @ 2211' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch ~ 14. Estimated date for commencing operation I June 1990 16. If proposal was verbally approved .... Name. of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ' T~le FOR ~OMMI~ION H~F ONLY Conditions of ~proval: Notify Commission so representative may witne~ Date Plug integrity ..... BOP Test Mechanical Integrity Test .. . Approved by order of the Commissioner Form 10-403 Rev 06/15/88 15. Status of well classification as: Oil x Gas .... Suspended Location clearance Subsequent form required 10- 374 M. J. Brown cc: J. Gruber, ATO-1478 ORIGINAL :,,SIGNED BY P1(15-3)W1-3 SUBMI~ I~J TRIPLICATE Well 15-03 Coiled Tubing Unit Cement Squeeze Preliminary Procedure Objective: Perform a CTU cement squeeze to eliminate excess gas production from a channel extending from the GOC to the perforations. 1. Make a slickline tag run to verify PBTD. 2. RU CTU and cement equipment. Pack the wellbore with filtered seawater. Cement squeeze all perforations with a high pressure conventional squeeze. Cement volumes will be sufficient to cover all perforations. The following perforations will be squeezed: Zone Perforations SPF i 9144'-9174' 4 i 9180-.9200' 4 I 9214'-9234' 4 (Ref. BHCS 3-12-82) 3. Jet or reverse out the contaminated cement. RD CTU. Let cement cure for I week. 4. Perforate the well as follows: Zone Perforations SPF Comment i 9214'-9245' FSD perf 31' (Ref. BHCS 3-12-82) 5. Test the well. Other Well Information Current status: Producing. Expected static bottomhole pressure: 3715 psi. @8800' SS Expected fluid in wellbore at reperforation: seawater. 6 4 2 C01L£D TUBING UNIT: BOP E0U l PllEN~ 1. ~)00 PSI ?" WELLHEAD CONNECTOR IrLAJ~OE 2. 5000 PSI 4 1/16" PIPE RAMS 3. ~d:)O0 PSI 4 1/6" HYD~L~ SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. ~d:)C)OPSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 HIREL]NE BOP EOUIPHENT ii 1. 5000 PSI 7" WELLHEAD CONNECIOR IrLANOE :2. 5000 PSI WIRE:LINE RAIaS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4, 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALASKA, INC. P·O· BOX ~00S60 ANCHORAGE, ALASKA DATE' 4-~ 8-90 REFERENCE' ARCO CASED HOLE FINALS 4-2?_ 3-~6-~0~ . TEMF' 5-4 3-23-90 TEMP ~S-~3 4-2-90 PRODUCTION F'ROFILE ~4-8 3-29-90 PITS ~4-33 4-2-90 LEAK DETECTION ~5-3 3-22-90 PRODUCTION PROFILE ~6-45 3-3~-90 PRODUCTION PROFILE ~7-3 4-~-90 PITS F'WDW2-~ S-28-90 INJECTION PROFILE PWDW2-~ 3-30-90 TEMP RUN RUN RUN RUN 4, 5' RUN ~, 2'85' RUN RUN RUN ~, 5' RUN RUN PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA· RECEIVED BY RECEIVED SALLY HOFFECKER AT0-~529 ./ APR 2 6 1990 AF'PROVED ~ TRANE~ 9r~t 69 ~~ge DISTRIBUTION ~ CENTRAL FILES · ,,.'"' CI.-IEVRON ~~ EXTENSION EXPLORATION ~ EXXON MARATHON ~~ MOBIL PHILLIPS F'B WELL FILES R & D BF'X STATE OF ALASKA TEXACO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PRUDHOE BAY FIELD K-VALVE DOME SEI'rlNG PRESSURE DATA SHEET Drillsite.Well: 15--03 Date: Comments: Well's GOR has come up since last design. WELL SHOULD TEST EASILY IF DUMPED TO AN LP CMLN. 8/25/89 Previous K-valve Settings: Set Pressure, psig Date 1300 11/29/86 Production Data: ROR- 2000 CFR= Swing Well (very high or Iow GOR) .............. Design Parameters: Design parameters are based on (Mark one of these) 8~23~89 Oil Rate Watercut Formation GOR Gas Lift Gas Rate Total GLR Flowing Tbg. Pressure Flow. Wellhead Temp. 2029 0 6276 0 6276 2130 69 BOPD @ BOPD @ 64 deg. choke deg. choke Choke Priority Well ....................... Actual Well Test ..... Date of Test ...................... Flowing Press. Survey ...... Date of Survey ...... Theoretical Rates used with Hydraulics Program If hydraulics program was used of the parameters, mark which program.... BOPD percent scf/stbo mscfpd scf/stbl psig deg. F Temp. @ SSSV ............... Pressure @ SSSV ......... Pressure Adjustment to get some PH2 PH3 xxx PRUDHYD Other 101 deg. F 2429 psig 150 psig Calculated Dome Set Pressure = 1644.0 psig @ 60 deg. F IActual Dome Set Press. FTP at K-valve 'Closure 1640 1980 psig @ .60 deg. F psi~l 0. surface cc: Sennett / Farmer Wi~e~-t' Kenn~ (2 cople~ State o! Alaska ARCO ALaska, Inc P.O. Box t00360 Anchorage, ALaska 995J0 DATE' JuLy.:.o9. ,i°. 86 REFERENCE' ARCO Cased HoLe Final ,--"' lO 7-i4-~.°; F'o_~:t 2.tueeze +.emp CCL Run i 5' 4-3. ~-~-86, ~ F'roduc~ion F'rofi ~e Run 4-24 4-5-86 ACBLog/VDL/2i gn/GR Run i 5' 4-30 ~-t, i/t~°-86 ~:pinner [oa_ Run ~, ~-' 4-:t 7-i~/ii-86 Produc+ion F'rofj Le Run 6-4 6-i5-86 Epi LoG/LAC Run 2 6-9 6-t6-86 Epi Log/L~ Run 2 5' 6 t5 7-i6-86 e Run t S' - ~.pinner Temp _ 9-29 6-7-86 F'DK-iO0 Run t 5' it-7 7-~6-86 Temp Log Run ~ 5' i3-29 7-.t4-86 FLuid Density. l'emp ~'urvey Run t~-~ 7-7-86 Production F'rofi Le Run i7-3 7-i3-86 Pumpin Temp ~urvey Run i 5' C8 ii', r'Z_ 0 Ca hiC o Dress Camco Ca I~'~c o Dress C8 ~ C o Dress Cmmco C8 ~C o C8 ~ o F'Lea~e ~ign and re+,urn +,he a+.+.ached copy at receip+, of Received By HAVE A NICE DAY! TRAN£ ¢:86467 DISTRiBUTiON Cen+,rm [ F i ~e'=. Chevron Extension ExpLora?ion Ex xr, n · -,- Mob i [ Phi [Lip_--:-. PB LL F'; ~ We ' Le R & D Yoh i o -~'$tai:e of ALaska Texaco Oil & Gas Cons. CommJ~ Anchorage ARCO Alaska, Inc. ~ Prudhoe Bay E,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 25, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: RE: 15-3 Permit No. 82-30 Attached is the "Subsequent" Sundry Notice detailing work performed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/WWP/plt Attachments cc: Standard Alaska Production Company File PI(DS 15-3)W5-4 J U L 0 7 1986 Naska Oil & Gas Cons. Commission Anchorage WWP2/144 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate :ID Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, Inc. 3. Address PO Box 100360, Anchorage, AK 99510 4. Location of well at surface 1323'FNL, 262'FEL, Sec. 22, TllN, R14E, DM At top of productive interval 1443'FNL, 1316'FEL, Sec. 21, TllN, R14E, UN At effective depth At total depth 1426'FNL, 1325'FEL, Sec. 21, TllN, R14E, UM 5. Datum elevation (DF or KB) 63 ' Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 15-3 8. Approval number 82-30 9. APl number 50-- 029-20722 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner true vertical measured true vertical Length 110' 2673' 9302' 9310 feet 8977 feet 9276 feet 8939 feet Plugs (measured) Junk (measured) Size Cemented Measured depth 20" 400 SX Permafrost II 13 3/8" 2900 SX Fondu& CL. "G" True Vertical depth 110' 110' 2673' 2673' 9 5/8" 700 SX Cl. "G" 9302' RECEIVED J U L 0 7 1986 Perforation depth: measured 9144-9174', 9180-9200', 9214-9234' true vertical 8811-8841', 8847-8867', 88881-8901' Tubing (size, grade and measured depth) _.~ ½", 17#, L-80 @ 9129, and4TM: , 12.6#, N-80 @ 9138 'Alaska 0ii & Gas Cons. C0mmissi0n Packers and SSSV (type and measured depth) Anchorage BOT RHR Packer at 8665', BOT Wolverine Packer @ 9129', 'SSSV at 2211' 8969' 12. Stimulation or cement Squeeze summary 13. Intervals treated (measured) 9144-9174', 9180-9200', 9214-9234' Treatment description including volunles used and final pressure 2000 qal of 15% HC1; 4000 qal of 6% HCl - 13% HF;. Final pressure 1580 psiq Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing PresSure Prior to well operation 3334 8937 0 --- 1564 Subsequent to operation 2611 4107 0 1338 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. ,hereby certify that the foregoing is true and correct to the best of my knowledge Signed ---"~~,~,~,-~ ,..,,~.~ Title Operations Engineering Manager Date~~ Form 10-404 Rev. 12-1-85 W.W. Patterson ATO 1500, ext. 4372 Submit in Duplicate Drill Site 15-3 Selective Stimulation 6/12/86 MI & RU pump truck, transports & N2 Unit. Pressure tested all lines. Stimulated well as follows: \ 1000 gal of gelled NH~C1 water w/1000# of BAF 1000 gal of 15% HC1 wTadditives & atomized w/No 1 ~ 2000 gal of 6% HCl - 1~% HF w/additives & atomized w/N2 1000 gal of 2% NHAC1 water atomized w/No 1000 gal of gelled NH~Cl water w/1000# 8f BAF 1000 gal of 15% HCl wTadditives & atomized w/N~ 2000 gal of 6% HCl - 1~% HF w/additives & atomized w/N 2 1000 gal of 2% NHAC1 water atomized w/N2 1000 gal of diese% w/10% EGMBE atomized w/No displaced to formation w/crude atomized w/N~ RD & released equipment. Returned well to production. WWP2/144 ARCO Alaska, Inc. t[, Prudhoe Bay~....=lineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 28, 1986 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, AK 99501 RE: DS 15-3 Permit No. 82-30 Dear Mr. Chatterton: Attached is the "Intention" Sundry Notice detailing work planned on the above mentioned well. Very truly yours, D. F. Scheve Operations Engineering Manager DFS/WWP/plt Attachments cc: Standard Alaska Production Co. File Pi(DS 15-3)W5-4 WWP2/96 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany . STATE OF ALASKA ({i', ALASKA'( _AND GAS CONSERVATION C ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Na~e of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of Well Surface: 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, UM Producing Interval: 443 ' F~L. 1316' FEL, Sec. 21, TllN, R14E, UN ottom-Hole: 1426' FNL, 1325' FEL, Sec. 21, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 63' 6. Lease Designation and Serial No. ADL 26206 8. APl Number 50-- 029--20722 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate ~ Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. intends to selectively stimulate DS 15-3 to improve production profile as follows: a) b) c) d) e) f) g) h) i) Return well to 1000 gal of gelled NHAC1 water with 1000# of BAF 1000 gal of 15% HC1 w/additives, atomized w/N2 2000 gal of 6% HCl-1½% HF w/additives, atomized w/N2 1000 gal of 2% NHAC1 water atomized w/N~ 1000 gal of gelled NHAC1 water with 100~# of BAF 1000 ga!~of 15% HCl w/additives, atomized w/N2 2000 gal Of 6% HCl-1½% HF w/additives, atomized w/N2 1000 gal of 2% NHoCl water atomized w/N~ Displace to formation with crude atomizgd w/N2 production and test ~for new capacity; obtainj~ff.~~,,l~,~ A~cho~qe the well 14. I hereby certify that Lhe foregoing is true and correct to the best of my knowledge. Signed _~/'_.~~ _~~~ Title 0perations Engineering Manager Date The space below for Commission use Conditions of APproval, if any: Approved by By Order of the Commission Date __ Form 10-403 Rev. 7-1-80 09/Wo W, Patterson- AT0 1432 ext. 263-4372 Submit "Intentions" in Triplicate and "Subsequent RePorts" in Duplicate ARCO Alaska, Inc. Post Ofhce Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: June 5,1985 Reference: ARCO CH Finals f' 1-17 Neutron GR 5-17-85 2-24 / Neutron GR 5-12-85 3-12--~' Spinner 5-9-85 4-12~-~ Neutron GR 5-13-85 15-1/ Neutron GR 5-16-85 Spinner 5-11-85 Run 4 5" DA i 5" DA i 5" GO i 5" DA I 5" DA i 5" Otis Please sign as receipt of data. Received by Pam Lambert ATO 1429C Trans 141 '~evron tixpl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R & D Sohio ~'Scate .of Alaska T2xaco ' I~ STATE OF ALASKA : ALAS A ..AND GAS CONSERVATION C ,vllSSlON ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, I nc. 82-30 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20722 4. Location of well at surface 9. Unit or Lease Name 1323' FNL, 262' FNL, Sec.22, T11N, R14E, UR Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1443' FNL, 1316' FEL, Sec.21, T11N, R14E, UM 15-3 At Total Depth 11. Field and Pool 1426' FNL, 1325' FEL, Sec.21, T11N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool 63' RKB ADL 28306 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 03/09/82 03/20/82 04/02/82I N/A feet MS LI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 9310'MD,8977'TVD c~276'MD, 8939'TVD YES [X-I NO [] Nipple ~ 2211 feet MD 1800' (Approx) 22. Type Electric or Other Logs Run DIL/SP/GR, D I L/SP/BHCS/GR, FDC/CNL/GR/Cal , CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 110' 30" *00 sxs Permafrost II 13-3/8" 72.0# L-80 Surf 2673' 17-1/2" ~500 sxs Fondu + 400 sxs F: "C" 9-5/8" 47.0# L-80 + Surf 9302' 12-1/4"' ?00 sxs "G" cmt SOO 95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9090' - 9110'MD, ~ 4 spf ~ 90° 5-1/2" ' 9143' 8665' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A -, 27. N/A PRODUCTION TEST Date First ProdUction Method of Operation (Flowing, gas lift, etc.) DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 'TEST PERIOD ~ Flow Tubing CasingS'Pressure CALCULATED .~ OIL-BBL' GAS-MCF~ WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATEI~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None ," : ,. RECEIVED , ! 1984 Oil & Gas Con~ uommissi~,~ Form 10-407 Submit in duplicate Rev. 7-1-80 DRN/WC02 CONTINUED ON REVERSE SIDE 29. GEOLOGIC MARKERS NAME Top Sadlerochi t G/O Contact Base Sadlerochit MEAS. DEPTH 8703' 8962' 9245' TRUE VERT. DEPTH 8371' 8629' 8912' Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. NONE 31. LIST OF ATTACHMENTS Workover History 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed__~.L... _ Title Area Dril 1 ing Engr. Date INSTRUCTIONS General' This for.m is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. · .Item 16 and 24: If this well is completed for separate production from more than one interval (multiple · ~,-completion), so state in .item 16, and in item 24 show the Producing intervals for only the interval reported in item 27. Submit a seParate form for 'each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 15-3 WORKOVER HISTORY Accepted rig @ 1200 hrs, 02/15/83. Set BPV. ND tree. NU BOPE & tstd - ok. Pull BPV. Pulled tubing hanger & 1 jt of tubing. Tstd 9-5/8" csg to 2000 psi - ok. RIH w/gauge ring/JB. Perf'd 9206'-9214' w/4spf & 9008'-9012' w/4 spf. RIH & set cmt retainer @ 9132'. Pumped 200 sx Class G & squeezed. Ran temp log f/8550'-9126' WLM. Set bridge plug @ 8610'. Perf'd 8590'-8594' and 8086'-8090' w/4 spf. Retainer hung up & set ~ 7758'. RIH & sting into retainer & pumped 300 sx Class G cmt. Drld retainer & cmt to 8541' DPM. Tstd perfs 8086'-8090' - ok. Cont. drlg cmt to top of CR 8610' WLM. Tstd bottom perfs 8590'-8594'; not holding. TIH w/open-ended drillpipe; pumped 60 sx Class G (circ to spot balanced plug @ top of cmt retainer & Braidenhead sqz.) Drld cmt to 8594'. Tstd 9-5/8" csg & perfs (8590'-8594') to 2000 psi - ok. Drld retainer ~ 8610'. Washed & reamed to 9095'. Tstd 9-5/8" csg & prfs {9008'-9012'} to 2000 psi. TIH & set EZ drill cmt retainer @ 8965'. Stung into retainer & pumped 250 sx Class G cmt & squeezed'. Drld retainer & cmt to 9090'. Tstd 9-5/8" csg to 2000 psi - ok. Drld retainer @ 9132'. Drld cmt to 9276' PBTD. Tstd 9-5/8" csg to 2000 psi - ok. Ran CET f/9261'-8000'. Perf 9124-9128. RIH w/retainer on DP & set g 9220'. Squeeze 5 bbls acid into formation. Pumped & squeezed 25 sx Class G cmt. PU 8-1/2" bit & drl retainer & cmt to 9276'.Tested 9-5/8" csg to 2000 psi - ok. Circ hole clean. PO'OH. Ran CBL fr/9263-8000'. Ran GR/JB. Perf 9090-9110'. Set pkr @ 9129' WLM. RIH & LD 3-1/2" DP. Ran 5-1/2" compl assy. Unable to land 5-1/2" due to damaged spool. POOH & LD tbg. RIH w/ret. BP on 3-1/2" DP set at 2200'. ND BOPE to check tbg spool. Change out 9-5/8" pkoff., & 5-1/2" tbg spool. NU BOPE & tst to 5000 psi. RIH & pull BP. Run & land 5-1/2" tbg. Set pkr. Set BPV. ND BOPE. NU tree & test. Pull BPV. Attempt to pull dummy valve, would not go thru hanger assembly. Set BPV. ND tree, NU'BOPE & test. Pull BPV. Change out hanger. ND BOPE. NU tree & test. NU WL BOPE & lub. RIH w/ret, tool & pull dummy at 2211'. Set plug in nipple at 9141' to test tbg. RIH w/shifting tool & open SS~@ 8573. Displ tbg w/diesel + 30 bbls. Close SS. Test tbg to 2000 psi, ok. Attempt to retrieve DB plug w/o success. RIH w/tbg cutter & cut tbg @ 9138'. RD WL unit. Set BPV. RR @ 0400 03/12/83. RECEIVED CSM/WH2' l lm JAN 04/14/83 Arm!~gr~ MEMORAI OUM Stat of Alaska ALASKA OIL,.,V~~AN~D GAS CONSERVATIO~ COF~NISSIO}{ TO: C. ton DATE: October 27, 1983 '; : ? FILE NO: · aRU: Lonnie C. Smith ×?! ~' 108A:H4 Commissioner TELEPHONE NO: FROM: Harold R. Hawkins Petroleum Inspector SUBJECT: Witness Bench Testing on ARCO Alaska Inc., Well Ko. 15-3, K-valve, Serial K-04. Tuesday, October 25! 1983: I left ~'s Drill Site' 3, subject ~--' an°th'~r 're~r%," ko' the' Otis f&¢i~ ' .., ities to witness bench testing of a Otis type "K" valve, serial no.~ K-04. · This "K" valve is to be installed'"' in Well No. 15-3. The witness that observed bench test besides myself was Ellen Fitzgerald, an engineer for ARCO Alaska, Inc. The K-valve was set to trip at 412 PSIG. This was calculated out, with temp of 75"F. The valve was placed into a test nipple where the oil temp was 75"F. A pressure .of 1000 PSIG was then applied below valve and monitored by a gauge. Pressure above valve was then applied to 10O0 PSIG, the valve could be heard opening. Then the pressure was bled off slowly and valve closed when pressure above valve dropped slightly below 412 PSIG. The pressure above .,,valve was monitored and no pressure builup was observed. This p~ocedure was performed three times and valve operated properly all three times. In summary, I witnessed the bench testing of the "K" valve, to be installed in Well No. 15-3. The tests were performed satisfactorily. Attachment 02-001A(Rev. 10/79) Post Office BoX 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 October 4, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: DS 15-3 Permit No. 82-30 Attached is "Notice of Intention" Sundry Notice for work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/GJL/lmi Attachments cc: Sohio Petroleum Alaska 0it & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany  STATE OF ALASKA ALASKA ,,,...AND GAS CONSERVATION CO( AISSION SUNDRY NOTICES AND REPORTS ON WELLS OTHER [] 1. DRILLING WELL [] COMPLETED WE LL:~] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APINumber P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20722 4. Location of Well 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, gM 1443' FNL, 1316' FEL, Sec. 21, TllN, R14E, UM 1426' FNL, 1325' FEL, Sec. 21, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 63' RKB I 6. Lease Designation and Serial No. ADL 26306 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [j~] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. intends to replace the surface controlled subsurface safety valve in DS 15-3 with an Otis Type K, ambient type tubing safety valve. This valve is a normally-closed type with a preset dome charge. The valve uses a plunger and seat for its seal and closes when flowing tubing pressure drops below the preset dome pressure charge. Pressure must be applied to the tubing from the surface to reopen the valve. This change is necessitated by the loss of both surface control lines to the valve which was previously in place. Well 15-3 is completed with 5%" tubing and presently produces with a capacity of 6200 BOPD at a tubing pressure of 800 psi. Its producing GOR is 1000 SCF/STB. Approved Copy Returned, RECEIVED, OCT Alaska Oil& Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ..... ~ Tit~e Regional Engineer The space below for Commission use Date Conditions of APproval, if any: K-valve testing to be the sa~e as conventional surface controlled sub- surface safety valve tests. Witness of bench testing will be necessary if operational ...~ limitations make conventional flow testing procedures impractical. 0R]~IN~[ SJ~NED By Order of Approved by ~u,W ~ ~. ~,~;~ COMMISSIONER the Commission Date__ . Form 10-403 Submit "Intentions" in Triplicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCo Alaska, Inc. Post Office Box= J Anct~orage. Alaska 99510 Telephone 907 277 5637 June 28, 1983 Reference: Arco Pressure Data D.S. 15-3 6-8-83 6-8-83 Pre~sure Build-up Pressure Build-up Survey Report Camco P~~lease sign and re~urn the attached copy as receipt of data. KellyMcFa~land ATO-1429D T~ans. # 394 NORTH,GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON DISTRIBUTION A~Chora#e C°r~z~eio/7 ~ EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS CAROLINE SMITH ARCO Aias,~a. ;c.c. ;s a Suc$1Jia~'t,' ¢:f AHant;cRicmfi_,e~c ].: "'-: ". ARCO Alaska, Inc. (" Post Office Box 3150 Anchorage, Alaska 99510 Telephone 907 277 5637 June 28, 1983 Reference: Arco Cased Hole Final D.$. 15-3 6-8-83 SpAnner Log 5" Camco ~~se sign and return the attached copy as receipt of data. · . Kelly MCFarlan~ ATO-1429D Trans. # 396 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS CAROLINE SMITH Alaska Oil & Gas Cons. ARCO Alaska, Inc.t~=. Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 26, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: D.S. 15-3 D.S. 15-11 Permit No. 82-30 Permit No. 81-132 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned well. Very truly yours, D. F. Scheve DFS/JCD/cl Enclosures: cc: Sohio Petroleum ARCO Alaska, Inc. Is a Subsidiary of AflantlcRIchfleldCompany RECEIVED Anchorage (" STATE OF ALASKA o~V ALASKA OIL AND GAS CONSERVATION C ,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL::~I~I OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20722 4. Location of Well 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, OM (surf) 1443' FNL, 1316' FEL, Sec. 21, TllN, R14E, UM 1426' FNL, 1325' FEL, Sec. 21, TllN, R14E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 63' RKB ADL 28306 9. Unit or Lease Name Prudhoe Bay Unit 12. 10. Well Number D.S. 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began perforating operation 5/5/83. RU perforating unit, pressure tested surface equipment. RIH with gun #1, shot 9143'-9168'MD 4spf (25' ref. CNL 4/2/82), flow to tan] for cleanup, monitored rate and took shakeouts. POH - all shots fired. RIH with gun #: select fire, shot 9179'-9199'MD and 9168'-9173'MD 4spf (25' ref. CNL 4/2/82), flow to tank. POH - all shots fired. RIH with gun #3, shot 9213'-9233'MD 4spf (20' ref. CNL 4/2/82), flow to tank. POH - all shots fired. RD. Ran SSSV. Secured well 5/8/83. RECEIVED JUN = 3 1983 Anchora~le 14. I hereby certify that the foreg~Qing is true and correct to the best of my knowledge. Signed ,~,~;~J// ~~~_/ Title Regional Engi-eer The spac; b~l'e ~w' ~' - v _ for Commission us~' Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "l'ntentions" in Triplicate and "Subsequent Reports" in Duplicate ' [~. STATE Of ALASKA ~ ' ALASK l AND GAS CONSERVATION ~MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska~ Inc. 82-30 3. Address 8. APl Number , P.O. Box 100360, Anchorage~ Alaska 99510 50- 029-20722 4. Location of well at surface 9. Unit or Lease Name 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number lZ~3' FNL, 1316' FEL, Sec. 21, TllN, R14E, UM 15-3 At Total Depth 11. Field and Pool 1426' FNL~ 1325' FEL~ Sec. 21~ TllN~ R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0il Pool 63' RKBI ADL 28306 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 3/9/82 3/20/82 4/2/82I N/A feet MSL 1 17. TotalSepth(MS+TVS) 18.PlugBackSepth(MD+TVD) 19. SirectionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost 9310'MD 8977'TVD 9270'MD 8937'TVD YES E~ NO [] N/A feet MD 1800' (approx) 22. Type Electric or Other Logs Run DIL/BHC/OR/SP, FDC/CNL/GR/Cal, CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP. BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" ~l.b~ ~-40 Sure 110'' 30" 400sx Permafrost II 13-3/8" 72.0# L-80 Surf. 2673' 17½" 2500sx Fondu & 400sx Permafrost C 9-5/8" 47.0~ L-80 & Surf. 9302': 12~,, 700sx Class G S00-95 24. Perforations open to Production ~(M D+TVD of Top and Bottom and 25. TuB I NG. R ECOR D interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 9144' - 9174'MD 8811' -8901' TVD N/A 9180'-9200'MD 4spf 9214'-9234'MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. . ,. DEPTH INTERVAL(MD) AMOUNT& KIND OF MATERIA_LUSED Ref: BHCS 3/21/82 N/A · 27. PRODUCTION TEST Date First Production ' Method of Operation (FlOwing., gas lift, etc.) 5/8/83 Flowing ,. ,. · Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO 5/8/83 ' 12.5 TEST PERIOD ~ 3077 , .2370 : .,0.. 41] 924~ : Flow Tubing Casing Pressure ' CALCULATED , OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 865 · N/A ' ' 24-HOUR RATE I~ . 5312~'~i : -4909'/ 0 · 27 28. ~"~/~7 CO R E DATA B riefN/Adescription of l it h o logy, porosity, fractures, apparent dips and presence of oil, gas or w ate r. S ubm,. it c orA_chips__REC E Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Top Sadlerochit Orig. G/O Contact G/O Contact Movement Base Sadlerochit GEOLOGIC MARKERs ' MEAS. DEPTH TRUE VERT. DEPTH 8703' 8962' 9032' 9245' 8371' 8629' 8699' 8912' 30. ,. Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and.,24: If this well, is completed for separate production from more than one.interval (multiple completion),.i~So state in item 16, and in. item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate'whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the detai'ls of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc.i~ Post Office 360 Anchorage. Alaska 99510 Telephone 907 277 $537 May 26, 1983 Reference: Arco Pressure Data D.S. 7-6 J 4-9-83 D S 9-6 / 4-17-83 4-17-83 D.S. 14-6 ~./ 4-3-83 4-3-83 D.S. 14-11/ 3-24-83 D.S. 14-17 / 3-27-83 D.S. 14-21-~ 3-25-83 D.S. 15-3,,/ 5-6-83 Static Survey DA Pressure Build-up Camco Pressure Build-up Survey Report Pressure Build-up DA Pressure Build-up Survey Report Pressure Gradient Survey Otis Pressure Build-up Sch Pressure Build-up Sch Static Survey DA se sign and retUrn the attached copy as receipt of data. Kelly McFarland AFA-403 Trans. # 351 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING PHILLIPS SOHIO MARATHON CHEVRON GETTY D&M STATE OF ALASKA---Z~,,¢,~., DALLAS '4~¢,/.."'~ '-"' ~"/"~,'4,'"~' <' ~"Z' ~ CAROLINE SHZTH~:, ARCO Alaska, Inc. l~ Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer May 26, 1983 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 PorcuPine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 15-3 DS 15-11 DS 18-1 DS 18-3 DS 18-7 DS 18-10 Permit No. 82-30 Permit No. 81-132 Permit No. 82-80 Permit No. 82-109 Permit No. 82-128 Permit No. 82-143 Enclosed are Completion Reports for work done on the above- mentioned wells. Very truly yours, D. F. Scheve Regional Engineer DFS/JCD/cl Enclosures: cc: Sohio Petroleum Co. ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany (' STATE OF ALASKA rr~rr ALASKA 0IL AND GAS CONSERVATION C~!VlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL []XX OTHER 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 50- 029-20722 4. Location of Well Surface: 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, UN TD: 1426' SNL, 1325' WEL, Sec. 21, T11N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 63' RKB 12. I 6. Lease Designation and Serial No. ADL 28306 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 15-3 ,, 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~] Alter Casing [] Perforations [~X Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [~[X Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). See attached Dril ling Hi story. APR 2 ? !g83 Oit . Gas Cons, Comr~Jssio,~ 14. I hereby cer~ th~t.~the fore, going is true and correct to the best of my knowledge. Signed ~' - ~ ~f'~ Title Ar~.a Drl 11 i n9 fng! neer The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 CSM/SN1 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate 15-3 WORKOVER HISTORY Accepted rig @ 1200 hrs, 02/15/83. Set BPV. ND tree. NU BOPE & tstd - ok. Pull BPV. Pulled tubing hanger & I jt of tubing. Tstd 9-5/8" csg to 2000 psi - ok. RIH w/gauge ring/JB. Perf'd 9206'-9214' w/4spf & 9008'-9012' w/4 spf. RIH & set cmt retainer @ 9132'. Pumped 200 sx Class G & squeezed. Ran temp log f/8550'-9126' WLM. Set bridge plug @ 8610'. Perf'd ' O' RIH & 8590'-8594' and 8086_~-809 w/4 spf. Retainer hung up & set @ 7758'. sting into retainer & pumped 300 sx Class G cmt. Drld retainer & cmt to 8541' DPM. Tstd perfs 8086'-8090' - ok. Cont. drlg cmt to top of CR @ 8610' WLM. Tstd bottom perfs 8590'-8594'; not holding. TIH w/open-ended drillpipe; pumped 60 sx Class G (circ to spot balanced plug @ top of cmt retainer & Braidenhead sqz.) Drld cmt to 8594'. Tstd 9-5/8" csg & perfs (8590'-8594') to 2000 psi - ok. Drld retainer @ 8610'. Washed & reamed to 9095'. Tstd 9-5/8" csg & prfs (~Z~i.~') to 2000 psi. TIH & set EZ drill cmt retainer @ 8965'. Stung into retainer & pumped 250 sx Class G cmt & squeezed. Drld retainer & cmt to 9090'. Tstd 9-5/8" csg to 2000 psi - ok. Drld retainer @ 9132'. Drld cmt to 9276' PBTD. Tstd 9-5/8" csg to 2000 psi - ok. Ran CET f/9261'-8000'. Perf 9124-9128. RIH w/retainer on DP &set~~~~ Squeeze 5 bbls acid into f°r~at~-~i'~)-~ ~umped & squeezed 25 sx Class G cmt. ,PU 8-1/2" bit & drl retainer & cmt to 9276'.Tested 9-5/8" csg to 2000 psi - ok. Circ hole clean. POOH. Ran CBL fr/9263-8000'. Ran GR/JB. Perf 9090-9110'. Set pkr @ 9129' WLM. RIH & LD 3-1/2" DP.' Ran 5-1/2" compl assy. Unable to land 5-1/2" due to damaged spool. POOH & LD tbg. RIH w/ret. BP on 3-1/2" DP set at 2200'. ND BOPE to check tbg spool. Change out 9-5/8" pkoff, & 5-1/2" tbg spool. NU BOPE & tst to 5000 psi. RIH & pull BP. Run & land 5-1/2" tbg. Set pkr. Set BPV. ND BOPE. NU tree & test. Pull BPV. Attempt to pull dummy valve, would not go thru hanger assembly. Set BPV. ND tree, NU BOPE & test. Pull BPV. Change out hanger. ND BOPE. NU tree & test. NU WL BOPE & l ub. RIH w/ret, tool & pull dummy at 2211'. Set plug in nipple at 9141' to test tbg. RIH w/shifting tool & open SS @ 8573. Displ tbg w/diesel + 30 bbls. Close SS. Test tbg to 2000 psi, ok. Attempt to retrieve DB plug w/o success. RIH w/tbg cutter & cut tbg @ 9138' RD WE unit Set BPV mR @ 0400 03/12/83 ~!?~.<~,~,~!' CSM/WH2'llm 04/14/83 ARCO Alaska, Inc~ Post Office B~ 360 Anchorage,'~A%laska 99510 Telephone 9(}7 277 5637 April 18, 1983 Reference: Arco Cased Hole Finals D.S. 1-25b/ 3-2-83 ~ CCL for Squeeze Gun & Retainer 2-24-83/ CCL & Perf Record 2-24-83---- CBL/VD 2-27-83~-'-CBL/VD 2-27-83~/ CET D.S. 7-21 L~'5-83 CBL/VD 3-1-83 PAL D.S. 12-15~'~3-13-83 CBL/VD D.S. 13-2A/3-6-83 , EPL~'/ 2-26-83 EPL 2-25-83~ CET D.S. 13-23A~3-11-83 EPL D.S. 14-26v<~A/83 Spinner Log D.S. 14-30b//4-1-83 Spinner Log ~,~%.$.:i:I5":311~' 2-12-83~' -- CET ~ 3-3-83~CBL/VD 3-3-83 CCL & Perf Record Run 2 5" Run 1 5" Run 1 5" Run 2 5" Run 1 5" Run 1 5" Run 1 5" Run 2 5" ,..~Run 2 2," ~Run 1 2" Run 1 5" Run 1 5" 5" Camco 5" Camco Run 2 5" Run 1 5" Run 1 5" 2-28-83/ Squeeze Gun (4" Carrier, 4 shots per/ft.) 5" Sch D.S. 15-4 /4-4-83 Spinner Log 5" Camco sign and return %he attached~copy as receipt of data. Kelly McFarland DISTRIBUTION AFA-4 03 NORTH GEOLOGY Trans. ~ 286R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS CAROLINE ,.,~,, /~.~:..~]./.:~ U~- "'~-',":,~(Tr! "",~!,?.3[,0,~ - - - STATE OF ALASKA ~ ' 0 ALASKA ~.~ AND GAS CONSERVATION C~ VIISSION ~--'. 1t4 NTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well I--I Workover operatio~] 2, Name of operator 7, Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P. O. Box 360, Anchorage, AK 99510 so- 029-20722 4. Location of Well atsurface 1323' FNL, 262' FWL, Sec. 22, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 63' RKB ADL 28306 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool For the Month of. March ,1983 12, Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig @ 1200 hrs, 02/15/83. Pulled tbg hanger & I jt of tbg. Tst 9-5/8" csgo Perf'd 9206'-9214' & 9008'-9012'. Set cmt retainer @ 9132' & circ sqzd 200 sx Class G. Ran temp log. Set bridge plug @ 8610'. Perf'd 8590'-8594' & 8086'-8090'. Retainer set @ 7758'. Pumped & squeezed 300 sx Class G. Drtd cmt to 8610'. Tstd perfs. Pumped 60 sx Class G thru open-ended DP. Drld cmt & retaine'r @ 8610'. Tstd 9-5/8" Csg & perfs. Set r..etainer @ 8965'. Pumped & sqzd 250 sx Class G. Drld retainer, cmt & washed to 9276' PBTD. '~d:':.9~5'/8''~sg. Ran~.CET..Perf'd fr/.9124':]~9128' 'Sqzd5 bbl's acid into f'Orm; PumPed squeezed 25 sx Class G, Drl'd Cmt'retaiher & cmt to 9276'. Ran CBL. Ran GR/JB. Set .pkr @ 9129. Perf fr/9090'-9110'. RIH w/DP, LDDP. Ran 5-1/2" compl assy. Unable to land 5-1/2" due to damaged spool. Pull 5-1/2" tbg. Change out 5-1/2" spool & 9-5/8" packoff. Run & land 5-1/2" tbg. Set packer. Attempt to pull dummy valve, hngr not bored out. cor, rectly. Change out hngr & reland. Pull dummy valve. RIH w/shifting tool & open SS. DisPl tbg w/diesel. Close SS. Shot tail pipe off w/tbg cutter. Release rig @ 0400'03/12/83 14. Coring resume and brief description None Logs un an er r ~6mp ~ og ~P~q -~ ~6' CET f/9261'-8000' CBL f/9263'-8000' ~ d~rforating data s~ows 9~ misc~l~neous/~ta -~z~' squeez'e~ w/zuo'sx c/ass ~ 9124'-9128' squeezed w/25 sx Class G 9008'-9012' squeezed w/200 sx Class G + 250 sx Class G 8590'-8594' squeezed w/300 sx Class G + 60 sx Class G 8086'-8090' squeezed w/300 sx Class G Alaska Oil & Gas Cons, Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. , SIGNED TITLE DATE ~///~ -~ NOTE--Report on this form is required for each calendar month, r~ar~ss ~ ~He s~at~ o~ o~er~lons, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10~04 Submit in duplicate ~ev. ~-~-80 CSWBR20 15-3 WORKOVER HISTORY Accepted rig @ 1200 hrs, 02/15/83. ND tree. NU BOPE & tstd - ok. Pulled tubing hanger & I jt of tubing. Tstd 9-5/8" csg to 2000 psi - ok. RIH w/gauge ring/JB. Perf'd 9206'-9214' w/4spf & 9008'-9012' w/4 spf. RIH & set cmt retainer @ 9132'. Pumped 200 sx Class G & squeezed. Ran temp log f/8550'-9126' WLM. Set bridge plug @ 8610'. Perf'd 8590'-8594' and 8086'-8090' w/4 spf. Retainer hung up & set @ 7758'. RIH & sting into retainer & pumped 300 sx Class G cmt. Drld retainer & cmt to 8541' DPM. Tstd perfs 8086'-8090' - ok. Cont. drlg cmt to top of CR @ 8610' WLM. Tstd bottom perfs 8590'-8594'; not holding. TIH w/open-ended drillpipe; pumped 60 sx Class G (circ to spot balanced plug @ top of cmt retainer & Braidenhead sqz.) Drld cmt to 8594'. Tstd 9-5/8" csg & perfs (8590'-8594') to 2000 psi - ok. Drld retainer @ 8610'. Washed & reamed to 9095'. Tstd 9-5/8" csg & prfs (9008'-9012') to 2000 psi. TIH & set EZ drill cmt retainer @ 8965'. Stung into retainer & pumped 250 sx Class G cmt & squeezed, Drld retainer & cmt to 9090'. Tstd 9-5/8" csg to 2000 psi - ok. Drld retainer @ 9132'. Drld cmt to 9276' PBTD. Tstd 9-5/8" csg to 2000 psi - ok. Ran CET f/9261'-8000'. Perf 9124-9128. RIH w/retainer on DP & set @ 9220'. Squeeze 5 bbls acid into formation. Pumped & squeezed 25 sx Class G cmt. PU 8-1/2" bit & drl retainer & cmt to 9276'.Tested 9-5/8" csg to 2000 psi - ok. Circ hole clean. POOH. Ran CBL fr/9263-8000'. Ran GR/JB. Perf 9090-9110'. Set pkr @ 9129' WLM. RIH & LD 3-1/2" DP. Ran 5-1/2" compl assy. Unable to land 5-1/2" due to damaged spool. POOH & LD tbg. RIH w/ret. BP on 3-1/2" DP set at 2200'. ND BOPE to check tbg spool. Change out 9-5/8" pkoff, &.5-1/2" tbg spool. NU BOPE & tst to 5000 psi. RIH & pull BP. Run & land 5-1/2" tbg. Set pkr. ND BOPE. NU tree & test. Attempt to pull dummy valve, would not go thru hanger assembly. Set BPV. ND tree, NU BOPE & test. Pull BPV. Change out hanger. ND BOPE. NU tree & test. NU WL BOPE & lub. RIH w/ret, tool'& pull dummy at 2211'. Set pl~g'~nipple at 9141' to test tbg. RIH w/shifting tool & open SS @ 8573. Displ tbg w/diesel + 30 bbls. Close SS. Test tbg to 2000 psi, ~ok. Attempt to retrieve DB'plug w/o success. RIH w/tbg cutter & cut tbg @ 9138~. RD WL unit. Set BPV. RR @ 0400 03/12/83. CSM/WH2:1 lm 04/14/83 RECEIVED APR 1 8 1983 Alaska Oil & Gas Cons~ Commissior~ Anchorage AR, CO Alaska, Inc. Post Office B~ 50 Anchorage, APo.,~(a 99510 Telephone 907 277 5637 March 15, 1983 Mr. C. V. Chatterton Commissioner State of Alaska- Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchor. age, AK 99501 SUBJECT: State Reports Dear Mr. Chatterton' Enclosed are monthly reports for February on these drill sites- 1-25 1E-18 7-20 1E-19 7-21 1G-5 12-15 1G-6 12-16 1Y-12 12-17 1Y-13 13-2A 1Y-14 15-3 1Y-15 CIRI Wolf Lake Well #1 Ravik State #1 Also enclosed are well completion reports for: 1-24 1E-21. 2-8 1E-22 7-18 1F-1 7-19 1G-7 12-18 WSW-IO 13-9 WSW-11 1E-20 Tract Well 24-11-14' We al so are including subsequent Sundry Reports for 2-8, 7-18, 12-18, and 13-9. ARCO ALaska, Inc, is a subsidiary of AtlanticRichfieldCompany ~,~ .: · STATE OF ALASKA '~ ALASKA ~'_ AND GAS CONSERVATION C(~~' .~IISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operationx[~ 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 50- 029-20722 4. Location of Well at surface 1 FNL, 262' FWL, Sec. 22, TllN, R14E, UM 5. Elevationinfeet(indicateKB, DF, etc.) 63' RKB I 6. LeaseDesignationandSerialNo. ADL 28306 9. Unit or Lease Name Prudhoe Bay Unit, lO. WellNo. DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool For the Month of. February ,1983 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig ~ 1200 hfs, 02/15/83, Pulled t,bg hanger & 1 jt, of t,bg. Tst,d 9-5/8" csg, Perf'd 9206'-9214' & 9008'-9012'. Set,, crnt ret,airier; pumped & squeezed 200 sx Class Ran ternp log, Set, bridge plug & perf'd 8590'-8594' & 8086'-8090'. Set crnt pumped & squeezed 300 sx Class G, Tstd perfs. Pumped 60 sx Class G thru open-ended DP Drld cmt & retainer, Tstd 9-5/8" csg & perfs. Set, ret,ainer ~ 8965'; purnped& squeezed 250 sx Class G, Drld ret,ainer, crnt, & washed t,o 9276' PBTD,~ Tstd 9-5/8" csg. Ran CET 13. Casing or liner run and quantities of cement, results of pressurg tests as of 02/28/83, SEE W0RK0VER HISTORY None 14. Coringresumeandbriefdescription None 15. Logs run and depth where run Ternp log f/8550'-9126' CET f/9261'-8000' 16. DST data, perforating data, shows of H2S, miscellaneous data 9206'-9214' 8590'-8594' 8086'-8090' squeezed w/200 sx Class G Squeezed w/300 sx Class G 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED TITLE Area Dri 1 ] ing Engi neet DATE NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 G R U 2 / F! R 1 0 Submit in duplicate Rev. 7-1-80 15-3 WORKOVER HISTORY Accepted rig @ 1200 hrs, 02/15/83. ND tree. NU BOPE & tstd - ok. Pulled tubing hanger & i jt of tubing. Tstd 9-5/8" csg to 2300 psi - ok. RIH w/gauge ring/JB. Perf'd 9206'-9214' w/4spf & 9008'-9012' w/4 spf. RIH & set cmt retainer @ 9132'. Pumped 200 sx Class G & squeezed. Ran temp log f/8550'-9126' WLM. Set bridge plug @ 8610'. Perf'd 8590'-8594' and 8086'-8090' w/4 spf. Set cmt retainer @ 7758'. Stung into retainer & pumped 300 sx Class G cmt. Drld cmt, retainer & more cmt to 8541' DPM. Tstd perfs 8086'-8090' - ok. Cont. drlg cmt to top of CR @ 8610' WLM (8591' DPM). Tstd bottom perfs.~'; ~. TIH w/open-ended drillpipe; pumped 60 sx Class G (circ to spot balanced plug @ top of cmt retainer.) Drld cmt to(~'- void f/8594'-8608'. Tstd 9-5/8" csg & perfs (8590'-8594') to 2000 psi - ok. Drld retainer @ 8609' to 8612'. Washed & reamed to 9095'. Tstd 9-5/8" csg & perfs (9008'-9012') to~2000 psi. TIH & set EZ drill cmt retainer @ 8965'. Stung into retainer & pumped 250 sx Class G cmt & squeezed. Drld retainer & cmt to 9008'. Washed to 9090'. Tstd 9-5/8" csg to 2000 psi - ok. Drld retainer @ 9132'. Drld cmt to 9220'. Washed to 9276' PBTD. Tstd 9-5/8" csg to 2000 psi - ok. Ran CET f/9261'-8000' as of 02/28/83. GRU2/WH3 03/07/83 ARCO Alaska, Inc. { Post Office B(~x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 17, 1983 Mr. C. V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commi ssi on 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: DS 15-3 and DS 5-11 Dear Mr. Chatterton' Enclosed are our sundry notices of intent outlining the work to be done on the subject wells. If you have any questions, please call me at 263-4965. Sincerely, M. A. Major Area Drilling Engineer MAM/KJG12- sm Enclosures ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieldCompany ~0~L STATE OF ALASKA O(M ALASKA AND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL i-~X 2. Name of Operator ARCO Alaska, Inc. ~.~ 3. Address P. O. Box 360, Anchorage, AK 99510 4. Location of Well Surface: 1323' S & 262' E of NW CR, Sec. 22, T11N, R14E, TD: 1426' S & 1325' W of/~E CR, Sec. 21, T11N, R14E, UN 5. Elevation in feet (indicate KB, DF, etc.) 63' RKB 6. Lease Designation and Serial No. ADL 28306 OTHER [] 7. Permit No. 82-30 8. APl Number bO-- 029-20722 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well []~( Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing ,(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to enhance the zonal isolation in the Sadlerochit by perforating the 9-5/8" casing (run to TD) @ 9206'-9214' and 9008'-9012'. Cement will be circulated between the perforations. The interval from 9090'-9110' will be perforated @ 4 spf with a 4" csg gun. The well will be completed with new 5-1/2" plastic-coated tubing with a packer set above and below the perforations and gas lift mandrels between the packers. Necessary requirements for subsurface safety equipment will be met. A 13-5/8", 5000 psi, RSRRA BOP stack will be used on well work performed by the workover rig. The BOP equipment will be pressure-tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Approximate start date is February 15, 1983. NOTE: This sundry was previously submitted and approved on 06/17/82. Verbal approval was obtained by John Leverson on 02/11/83 due to the long delay in starting the workover. The cement squeeze interval was changed to be more effective. The Sag River will also be squeeze cemented to assure adequate isolation. Subsequent Work Reported 14. I hereby,~rtify that.~l~e f~is_ true and correct to the best of my knowledge. Signed Title Area Drilling Engineer The space below for Comn~ission use Conditions of Approval, if any: Approvedb¥ ~ ,~, ~~ COMMISSIONER Form 10-403 Rev. 7-1-80 Ap;~roved Copy ' t ~ urned By Order of the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate February 16, 19 83 ARCO Alaska~ Inc. P.O. Box 360 Anchorage, Alaska..99510 Re~ Subsequent Reports, Sundry }~otiCes and Reports on Wells (Form 10-403 ) Attn~ Pete Van Dusen District Drilling Engineer For the following lists of "Notice .of Intention To.- ~ 'Sundry Notices aha Reports' on Wells (form 10-403) this office does not have on record the "Subsequent Report of~" ·defining the action taken on the approved intention. Please advise this office by Subsequent Report of the dispo~ition of the intention. Well ~- DS 14-18 W. Sak RAver State B5 . DS 12-~A DS 12-7 DS 13-3 DS 12-4 BP 24-10-14 DS 13-2 West Bay State 1 BP 31-10-16 DS 15-3 Oliktok Pt. 1 DS 15-3 .. DS 5-11 DS 16-13 N. Prudhoe Bay St. 2- Euparuk 1E-12 ARCD Date 2/11/8,1 6/9/~1 lO/23/81 · 11/23/81 11/2/81 12/15/81 12/15/81 12/23/81 2/2/82 2/23/82 3/17/,~2 3/23/82 4/2/82 4/5/82 6/2/82 6/2/82 ..~rief Description of__ Intent~9~ Change course of this well . Workover Abandon lower borehole prior to sidetrack Abandon lower borehole prior .to sidetrack Pull-and replace tubing Abandon lower borehole prior to sidetrack Plug and abandon Pull and replace tubing Test Lisburne formation Plug and abandon Change setting depth 9 5/8" casing Deepen 8% hole to basement Change. setting depth 9 5/$" casing Pull tubing and repair casing Sidetrack Abandonment procedure C~ange grade L-80 portion of 7" casing '/.I {1 III NORTH ALASKA DISTRICT. PRUDHOE BAY IIII I II I III I II III I [] , .F. RE.'r c~=rn. m^t , ma RECEIVED PROPERLY REGISTERED AND LICENSED-TO P~~CE ~NO , ~RV~ING IN ~E ~A~ OF AUG 1 c i982 A~S~ AND ~AT '~ ~T REPRES~ AN ~ILT ~~la~ka 0il & Gas Cons. Commis MADE BY M~ AND THAT ~ Anchorage DIM~SIONS AND O~ D~AI~ . II I~11 III I II I I II I II IIII I~111 I ....... -ARCO Oil and Gas Company Post Office Box 360 Anchorage, A~ a 99510 Telephone 90[ 7 5637 Reference: Arco Cased Hole Finals D S 6-17~'' 7-8-82 Cement Evaluation Run 1 5" D.S. 6-1~'~' 7-4-82 CBL/VD Run 3 5" D.S. 13-25~ 7-9-82 Cement EValuation Run 1 5" D.S. 13-2~~-f 7-4-82 CBL/VD Run 3 5" D.S. 14-22' 6r10-82 CBL/VD Run 1 5" D.S. 14-2~ 6-10-82 CNL Run 1 5" D.S. 15-3~. 7-8-82 Cement Evaluation Run 1 5" D.S. 15-6~ 6-6-82 CNL Run 1 5" D.S. 18-2 7-14-82 CNL Run 1 5" Please sign and return the attached copy as receipt of data. Kelly McFarland Trans. # 332 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON CHEVRON STATE OF ALASKA RCO Alaska, Inc. Post Office Bo,. Anchorage. Alaska 99510 Telephone 907 277 5637 July 12, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil '& Gas Conservation Commi s s i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' State Reports Dear Mr. Chatterton' Enclosed 'are monthly reports for June on these drill sites' 2-24 14-22 2-25 15-6 6-17 18-1 13-22 18-2 13-25 1E-13 13-26 1H-8 14-15 Also enclosed is a well completion report for Kuparuk 1E-12, and subsequent sundry reports for: 3-14 14-6 4- 9 ~:5:': 3 4-15 Eileen No. 1 11-4 NGI-7 (Since the information on the Eileen well is of a confidential nature, we would appreciate it if you could store it in a secure area. ) Surveys for 2-22 and 13-21 are. being reran; completion reports for these wells will be submitted when approved surveys are received. Sincerely, P. A. VanDusen Regional Drilling Engineer PAV/JG'llm ~-~ ~- 1 ~ e~.~ ~S RECEIVED JUL 1 2 I982 Alaska Oil & Gas Cons, ARCO Alaska. Inc. is a subsidiary o! AtlanlicRichfieiL;Company STATE OF ALASKA ' ALASK ,L AND GAS CONSERVATION C ,,,MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL I~X OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510' 50- 029-20722 4. Location of Well Surface: 1323'S & 262' E of NW ct, Sec. 22, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 63 ' RKB 6. Lease Designation and Serial No. ADL 28306 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other X[~] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed Work, for Abandonmentsee20 AAC 25.105-170). The proposed work described in our Sundry Notice, dated 06/16/82, has not been performed. Also, the work is not scheduled to be done in the immediate future. RECEIVED JUL 1 2 982 Alaska 0ii & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~, ~ ~~ ,~/~ Title Area Drilling Engineer The space below for Commission uSe Date Conditions of Approval, if any: By Order of Approved by. .... COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 GRU1/S7 Submit "Intentions" in Triplicate and "Subsequent Reports"in Duplicate ARCO Alaska, Inc. Post Office Bo '0 Anchorage, Ala~,ta 99510 Telephone 907 277 5637 June 16, 1982 Mr. C. D. Chat Chatterton State of Alaska Alaska Oil and Gas Conservati on Commi ssi on 3001 Porcupine Drive Anchorage, AK. 99501 Dear Mr. Chatterton- Subject. D.S. 15-1 Permit No. 82-6 D.S. 15-2 Permit No. 82-7 D.S. 15-3 Permit No. 82-30 D.S. 15-4 Permit No. 82-37 D.S. 1 5-11 Permit No. 81-132 D.S. 15-12 Permit No. 81-146 D.S. 15-13 Permit No. 81-124 D.S. 15-14 Permit No. 81-170 D.S. 15-15 Permit No. 81-181 Enclosed are our Sundry Notices detailing the work to be done on the above mentioned wells. Very truly yours, D. F. Scheve Regional Engineer DFS'TKKW-mlc Enclosures · ARCO Alaska, thc is ¢~ stlb,;,,'tiary of AllanlicRichlJeldComp,3ny ALASK IL AND GAS CONSERVATION ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 82-30 3. Address 8. APl Number P.O. BOX 360 Anchorage, AK 99510 50- 029-20722 4. Location of Well 1323' FNL, 262' FWL, Sec 22, TllN. R14E, UM (surf) 9. Unit or Lease Name Prudhoe Bay Unit 1443' FNL, 1316' FEL, Sec 21, TllN, R14E, UM (top producing interval) 1426' FNL, 1325' FEL, Sec 21, TllN, R14E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) RKB 63' 6. Lease Designation and Serial No. ADL 28306 10. Well Number D.S. 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool 12. (Submit in Triplicate) Perforate ~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to perforate selected intervals within the Sadlerochit Sand for production from the Prudhoe Bay Unit. Upon perforating, the well will be flowed to the flow station for clean-up and production. Should additional drawdown be necessary to unload the wells, it may be flowed to a tank for initial clean-up. The perforated intervals. will be given in the subsequent report. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to working pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. JUN 1 7 1982 AJaska 0il & Gas Cons. Commission 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed , -_ Title Re~. O~r8. ~neor Date The space below for Commission use Conditions of Approval, if any: Approved Copy Refurned Approved by COMMISSIONER the Commission Date Form 10-403 Submit "Intentions" in Triplicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office B°x 360 3une 15, 1982 Mr. C. V. Chat te.'.rton Commissioner St:ate of- Alaska Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBOECT: DS 14-15, Dear Hr. Chatterton: EnclOsed are our sundry notices oF intent outlining the wock ~o be done on the subject wells. If- you have any questions, please call me at 263-4965. Sincerely, H. A. Major Area Drilling Engineer MAH/JG:llm Enclosures 3G7/A17 t E£EIVED JUN ~ 6 ]982 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska Inc is ¢ subsidiary of AtlanticRichfieldComCany STATE OF ALASKA ALASK .L AND GAS CONSERVATION ~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL)C] OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, ]:ne. 82-30 3. Address 8. APl Number ?, 0, Box 360, Anchorage, AK 99510 50-029-20722 4. Location of Well Surface: 1323' S & 262' TD : 1426' S & 1325' 5. Elevation in feet (indicate KB, DF, etc.) 63' RKB E o4 NW CR, Sec. 22,T11N,R14E, UM W o~ NE CR, Sec. 21, T11N, R14E, UM I 6 . Lease Designation and Serial No. ADL 28306 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [~] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to enhance the zonal ~solation in the Sadlerochit by per- rotating lhe 9-5/8" casing (run to TD) from 9135'-9145~& squeeze cement into lhis zone. The interval from 9090'-9110' will be perforated ~ 4 spf with a 4" csg gun. The well will be completed with new 5-1/2#plastic-coated tubing with a packer set above and below the perforations and gas lift mandrels between the packers. Necessary requirements for subsurface safety equipment will. be met. A 13-5/8"2 5000 psi, RSRRA BOP stack will be used on well work performed by the workover rig. The BOP equipment will be pressure-tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and lested upon conclusion of the job. Approximate start date is 06/19/82. CE I VE O Gas Cons. Commission Anchorage 1;4. I hereby certify t_hat~the for~,~oing is true and correct to the best of my knowledge. ,, Signed TioeArea Drilling Engineer The space below for Commission use Date ~1~/~'6/O~ .~' Conditions of Approval, if any: ORIGINAl.' SIGNED Approved by COMMISSIONER ' Approved Copy Eefur~ed By Order of the Commission Date Form 10-403 G R 11 / A10 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box 360 Anchorage, ,~'-~ska 99510 Telephone S ,~77 5637 June 9, 1982 Reference: ARCO CASED HOLE FINALS ~,D.S.15-3 3/20/82 CNL/GR Run 1 5" D.S.i-13 5/17/82 Collar & Perf Log D.S.15-4 4/8/82 CCL Run 2 5" Run 1 5" lease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 217 DI'STRIBUTION R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO:' GEOLOGY MARATHON '~' AI;iska, Inc.subsidiary Atlantic~,~c~ fleldComp~ny ARCO Is a of ARCO Alaska, Inc. Post Office Box 360 Anchorage, A'~ska 99510 Telephone 9 ;77 5637 June 9, 1982 Reference: ARCO OPEN HOLE FINAL LOGS D.S.15-3 D.S.15-3 'D.S.15-3 D.S.15-3 D.S.15-3 3/21/82 FDC Run 2 5" 3/21/82 FDC/CNL Run 2 5" 3/20/82 & 3/21/82 BHCS Run 1 & 2 2" & 5" 3/20/82 & 3/23/82 DIL/SFL Run 1 & 2 2" & 5" 3/20/82 Cyberlook Run 1 5" D.S.13-24 5/16/82 MDT W/PrintoUt Run 1 2"/5" Please sign and return 'the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 216 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS D~9~O~ C~9~0~ ARCC, ,Alaska, Inc. is a subsidiary of AUanticRtchfieldCornpan¥ ... EXXON MOBIL GETTY D&M GEOLOGY Oil & Gas Con~. ~,~,,:~','dssion ..::.-, Anchorags ../ · . o o . · PROPERLY AL A.S-&A A,'~. ~AT ~.~ ~'~ z /- REGISTE?,-Q~.- AND IH ~4~_ ~qTA,'T'E ~ IG Telephone 907 277 5637 May 17, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.2-21//5/1/82 D S 12-14~ 4/29/82 D.S.13-18~'- 4/30/82 D.S.14-9Bo-~- 3/8/82 D.S.14-9B~ 4/21/82 D.S.14-28~ _3/22/82 D S 14-29~w/3/12/82 D.S.15-3~ 3/23/82 D.S.15-4j 4/22/82 D.S.15-14~ 12/25/81 D.S.15-14~ 12/25/81 D.S.16-14/ 3/18/82 D.S.17-10J-4/7/82 D.S.14~30 ~' 5/8/82 D.S.14-5 ~" 5/8&9/82 ACBL/VDL/GR Run 1 5" PLS Run 1 5" ACBL/VDL/GR Run 1 5" C.A.T. Log Run 1 5" Gamma Ray Neutron Run 1 5" CBL/VDL Run 1 5" C.A.T. Log Run 1 5" CBL/VD Run 1 5" ACBL/VDL/GR Run 1 5" Collar for Gyro Correlation Run 1 2"/5" CNL/GR Run 1 2"/5" Perf Record W/CCL Run 1 5"/2" PLS Run 1 5" Collar Log Run 1 5" Collar Log for Tattle Tale thru Tubing vented Bridge Plug Run 1 5~' D.S.14-29~'' 5/8/82 Collar & Perf Log Run 2 5" D.S.1-8~ 4/24/82 Diff Temp Log Run 1 5" sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 170 DISTRIBUTION NORTH GEOLOGY R&D DRILLING. PHILLIPs SOHIO MARATHON CEEVRON EXXO~ MOBIL GETTY. D&M GEOLOGY '~STATE;~'OF~ALASKA Oil & Gas Cons. Commission ARCO AlasKa, Inc. Post Office !.. Anchorage. A!-~. ~,~ ?,~!.~!O Telephone gO7 27? ~;637 Hay 18, 1982 Hr., C. V. Chattect°n Commissioner StaLe oF Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: SLate Reports - Prudhoe Bay Dear Mr. Chatterton: Enclosed are Well Completion Reports roc the Following drill sites: 12-7A 14-28 13-17 14-30 13-23A 14-9B 15-12 Also enclosed ace monthly reports For April on these d~ill sites: 2-19 14-17 2-20 15-4 2-21 15-5 13-18 Eileen #1 13-21 West Sak 24 Surveys for 2-19, 2-20, E'ileen #1, and West Sak 24 are being reran; completion reports For these wells will be submitted when the corrected surveys aB.e.ceceived. The reports on Eileen tfl and:'West Sak 24 ace off a confidential nature. We would appreciate it iF you could store [his information in a secure area. Sincerely, P. A. Van Dusen District Drilling Engineer PAV:JG/llm i . GRU6/A9 WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED)(~ ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Znc. 82-30 3. Address 8. APl Number P. 0. Box 360, Anchorage, AK 99510 so-029-20722 --- - 9. Unit or Lease Name 4. Location of well at surface LOCATIONS, Prudhoe Bay Unlt 1323'FNL, 262'FWL, Sec. 22, T11N, R14E, UN VERIFIED At Top Producing Interval Surf i~-~ 10. Well Number 1443'FNL, 1316'FEL, See. 21, T11N, R14E, UM B.H' At Total Depth 11. Field and Pool 1Zt26'FNL, 1325'FEL, Sec. 21, T11N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0il Pool 63' RKBI ADL 28306 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of CompletiOns 3/9/82 3/20/82 4/2/82I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost 9310'MD 8977'TVD 9270'MD 8937'TVD YES[] NOE3 N/A feetMDI 1800' (approx) 22. Type Electric or Other Logs Run DIL/BHC/GR/SP, FDC/CNL/GR/Cal, CBL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 110' 30" 400sx Permafrost II 13-3/8" 72.0# L-80 Surf 2673' 17-1/2" 2500sx Fondu & Zt00sx Permafrost C 9 5/8" 47.0# L-80 & Surf 9302' 12-1/4" 700sx Class G S00-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A N/A 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. PRODUCTION TEST ,' Date First Production I Method of Operation (Flowing, gas lift, etc.) I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.R[CFIVEI) N/^ iV1AY 1 9 1982 ~,~ka 0il & Gas Cons. Commission Anchorage Form 10-407 . Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GRU5/B1/2/3 NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 8703' 8371' N/A Orig. G/0 (~:~ta~ 8962' 8629' G/O Contact 9032' 8699' Movement Base Sadieroehit 9245' 8912' 31. LIST OF ATTACHMENTS Driiiing History, Gyro-MuIti Shot Survey (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~ Title Area Drlq Engr Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 2.7. Submit a seParate form for each additional interval to be separately produced, showing the , data pertinent to such interval. . Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 DS 15-3 Drilling Hlstory NU 20" Hydril & diverter. Spudded well ~ 1800 hfs, 03/09/82. Drld 17-1/2" hole to 2678'. Ran 64 its 13-3/8" 72#/ft, L-80, BTC csg w/shoe ~ 2673'. Cmtd 13-3/8" csg w/2500 sx Fondu & 400 sx Rermafrost C. ND 20" Hydril. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BORE & tstd to 5000 psi - ok Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.5 ppg EMW - ok. Drld 12-1/4" hole to 9134'. Run DIL/BHC/GR/SR & FDC/CNL/GR/Cal. Drld 12-1/4" hole to 9310'. Ran DIL/BHC/GR/SR to 9300'. Ran FDC/CNL/GR/Cal. Ran 227 its 9-~/8" 47#/ft, L-80 & S00-95 w/shoe ~ 9302'. Cmtd 9-5/8" csg w/700 sx Class G cmt. Instld 9-5/8" packoff & tstd to 5000 psi - ok. Tstd csg to 3000 psi - ok. Drld FC & cmt to 9270' RBTD. Arctic packed 9-5/8" x 13-3/8" annulus. Displaced well to NaC1. Ran CBL (8000'-9267'), log showed no cmt bond at this time. Ran CBL (6830'- ~26~'), log showed no cmt bond at this time. (Note: Drld hard cmt below FC 12 hfs after CIR. Cmt samples set up hard in 12 hrs. No lost returns or indica- tion of problems while cementing the casing.) Set tbg hanger & one jt tbg. Set BRV. ND BORE. NU tree & tstd to 5000 psi - ok. Rlaced diesel cap at surface. Instld tree cap & tstd to 5000 psi - ok. Secured well & released rig ~ 0800 hfs, 03/24/82. Note: Well was suspended without completing because of a questionable CBL. Gyro-Multi Shot Survey ran on 4/2/82. OG:llm 05/13/82 GRU3/A16 MAY I ~ i882 0il & 6as 0ohs. Eastman Whipstock A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY ARCO ALASKA, INC. COMPANY DS 15, Well Number: 3 WELLNAME Prudhoe Bay, North Slope, Alaska LOCATION JOB NUMBER TYPE OF SURVEY DATE A0482G0425 SURVEY BY D Miller Gyro Multi Shot 02-Apr-82 RECEIVED MAY 0 6 ]982 Alaska Oil & 6as Cons. Commission Anchorage OFFICE Alaska I~'ORM o-30z RZ E Eastman Whipstock A PETROLANE COMPANY P. O. Box 4-19?O/Anchorage, Alaska 99509/(907) 349-4617 April 29, 1982 ARCO ALASKA, INC. P.O. Box 360 Anchorage, Alaska 99510 Well Number: 15-3 Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Gyro Multi Shot Date: 02-Apr-82 Method of Computation: Radius of Curvature Surveyor: D Miller Job Number: A0482G0425 Attn: Bob Hines Dear Mr. Hines, We are enclosing the original and sixteen copies of the Gyro Multi Shot Survey run on the above mentioned well. To date, the following distribution has been accomplished: A;''.~ _copy telecopied to E/W North Slope office for delivery to ARCO field representives. copies delivered to drilling for in-house distribution. C'''3 copies for E/W permanent well files. We wish to take this opportunity to thank you for calling on our services and we trust that we may continue to serve your needs in the future. Sincerely, ST/bb cc: file enclosure Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide ARCO ALASKA INC~ D.~ I , WELl_ N[)~ G GMS dOB NO~ ............. PRUDHOE-BAY~', .....NO'RTH-'S ~'OF'E,---Afi:'AS'K'A ...............D AT E-' R U N: 2- A PR- 8'2 GMS, 0-9200 ki]:l~ SURVEYOR~ MILLER GYRO NO~ 5SS, CAMERA NO: 1629, 34 DEG A/U: 215 ....... F'ORES'IGH'T~ ...... S-~7E (BENCHM'ARt~-) RECORD OF SURVEY RA. BI~U S--O F-.~- C U RV ATU RE-.M E-T H iS 15, WE;L/.. NO; 3 GMS JOB NO; AO482G0425 TIME DATE iRUDFIOE BAY, NORTH SLOPE, AI..ASKA .[;ATE RUN,~ 2-AF:'F;,:-S2 14,t28;05 29-APR--S2 TRUE !EASUREI) ORIFI' DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGI.~EG ..DEPT]4 ............ AN GL E-. DI R E.C.T-Z-O N-._L.ENC~-T_EL__D EP.-T H ....... SEC..T_ION .................... Z.V.D ................... C..... 0..--.0 ....R.-D .... I.--i-'L-A--T---F.-S-.~LZ-S-I:A N C E .... DZ- R. E C;T-- I-0 N---. S E-.V E R I-:l: Y FEEl' II Pi D FEET FEET' FEE]' FEET FEET FEET .D H DG/IOOFT .......... ~ ........... 0 ........ 0 ................... 0 0 .... :&.-O-O ........ 0...00 ..... 100, 0 15 S 25 E: 100, 100,00 --0o07 37,00 0,20 S 200, 0 1:;.. S 89 E: 100, ~'~00,00 -0,44 137,00 0,4~ S ~.0.0-. ............. 0 .... 0 0 .......................... $00+ .... $O0-.-O~ ............ ~ ..... 0--,66 ...... 2SZ. O0 ..................... 0....-43.~ 400, 0 15 N 74 W 100, 400,00 -.0,45 537,00 0,37 S 0.00 ................ O.O0 ........... 0 ........ 0 ............... O. 0,09 E 0,22 S 25 0 E 0 0,44 E 0,61 S 46 7 E 0 ~..6.6--E__--~0,-28 .......... S.--5~ ........ O._..E ............. 0 0,45 E 0,58 S 50 42 E 0 ,26 ,_25 - 1000 ............. O-SO ...... S. 60-.W 1100, 0 15 S 84 W 1200, 0 15 S 39 W ...... 1-300, 0 15 S. 64 E 1400. 0 30 S 88 W ....... 500, .............. 0-.1.5 .....N---65... W ...................... t-00-. .......... 50.0..,..00 ..................... 0.04 4,37...00 ........... 0 ,-21.--S 0.04--E. 0-,-22 ..... .D.27 600, 0 0 0 100. 600.00 0.16 ~'"-.00 0,12 S 0,16 W 0,o0 700, 0 S0 S S1 W 100. 700,00 0.38 637,00 0..50 S 0,38 W 0,6~ ......... 80'0-, O,-SO 8--....-..;¢6,-W .................. i-O0-, .......79:9--.-9L9 ............ 0-..,86 736 ,.99 i · 22 -S ....... 0-.86-W .................. 1 · 50 900, 0 15 S 52 W 100, 899,99 J.,31 836,99 1,69 S 1,32 W 2,15 S ..... 10-22-E ........ O, S 52 20 W S 37 39 W 0,50 S S5 14 W. 0,04 S 37 54 W O,27 S .42 6 S 47 39 S 49 12 S 44 21 S 41 0 W O, .',. ~ W 0,'29 W 0.19 W 0.39 W 0,75 ...... 15.00, · 0 SO N..88 W ........... I00-, .......... 1.4-9-9--..98 ..........3,74 14.36,98 .. 3,S0 S 3,-74--..W ........ 4,99 1600. 0 30 N 79 W 100, 1599,97 4,60 1536,97 S,21S 4.61W 5,61 1700. 0 45 N 72 W 100. 1699,97 5.66 1636,97 2,93 S 5.66 W 6,58 .... 1800. 0,.-.~0 N-66 W ................. 100-, .... 1~/~-9--.-.~6 ............... 6,68 t-7¥6.~:96 ...... 2.54-S 6,68--,-W .............. 7.-,-15 1900, 0 30 N 74 W 100, 1899,96 7,50 1836,96 2,°4~. ~' 7,50 W 7,83 S 48 S4 W 0.05 S ~ 11 W 0 08 S 62 38 W 0,26 S 69 10 W 0,26 S 73 21 W 100. 0 45 N 16 E 100. 209'9,94 7,66 °0.36 94 0,1TM S 7.66 W 7~66 2200. 0 :15 N 39 E 100, 2199,93 7,06 2136,9'~ 1,03 N 7,06 W 7+13 2400, 0 45 N 72 E 100, ;~399,92 4,95 25~6,92 ~°,48 N 4,~2 W 5.51 S--80 S 89 N 81 N .72 N 63 8 W 4 W 43 W S6. W 15 W 0,89 O,OS O, '-~1 --2500, ............ 1 ........... 0 ....... N-8.2 E ................... t00-,---24-99-,-9-1- ............................ S,4--4 24¥_.-,-~'.t .............. ~.o; N ....... 3,44--W ....... 4,45 N 50 35 W 2600, I 15 N 90 E 100, 2599,89 1,48 m,::--~& 89 '~,9'6 N 1,48 W S,S1 N 26 S2 W 2700, 1 SO ~.° 84 E 100, .... ?699,86 -0,91 2636,86 m,_~m. N 0,92 E 2,98 N 17 :'=:,¢ E ........... 80u.. ........ 1 ....... ~.u S....b:., E 100. ............ 2.Y-~9.8-2 ~ .5;2 27~6.82 2, :;~' · ~ N S, E 4,37 N ~3 44 E . _~9,~0,~. i 45 S 75 E 100,~.9899+78 ..... -.-6,31 2836,7R ~°,09 N 6+31 E A,6~:'~, N 71 40 E .29 .29 ,29 - r' '15, WEI._L NO,~ 5 GHS .JOB NO** A0482G0425 TIME DATE ~RUOHOE BAY, NORTH SL..OPE, AL.ASEA DATE RUN~~?-AF'R-82 14~'~05 29-APR-82 TRUE tEASURED DRIFT DRIFT COURSE VERTICAL VERTICAL SUBSEA R E C T A N G U L A R C L 0 S U R E DOGLEG EF%H ........ A N G-~~E ~' IR E C T t 0 N .~- LE N G T H ......... D E F'¥ H ............ ~S E~'~:IO N ................. -TVD ............. C 0-0-'-R-{;--I .... N- ~--T-- E--S--D-I-ST A N C E ...... D~-t R E C T I 0 N S E V E R I T Y FEET D M D FEET FEET FEET FEET FEET FEET D M DG/100F'T S100, i SO S 57 E 100, S099,70 -11,87 S036,70 0,25 N 11,87 E 11,87 N 88 47 E 0,62 S200 i SO ::' ='": - ., ..,., E 100, S199,66 -14 02 S1"6 66 1,25 S 14,02 E 14,07 S 84 54 E 0 10 S400 2 45 S 58 E 100 SS99 53 18 59 SSS6,o~ 6 70 S 18 58 E 19,75 S 70 10 E 1,56 "-350 ¢",- ........... 4 ......... 0 ....S .... Y 6 · W 100"~ .......... S'4'99~-~5 ................ '1-7'-,--87- ......... 34S-6 ,'.S 5 ti~'. 27-S ............. -t-7',8 5'-'E ........... -2 i',-1 t 3600, 6 J.='._, S 87 W 100, 3598,95 -9,0A_ 3511.~l__,9!""; 1'~.,59 ~ 9,03 E 15,50 3700, 9 30 S 87 W 100, 3697,99 4,62 3634,99 13,S1 S 4,65 W 14,10 G800~', ..... tt~'30 S'86 W t00, ...... -Z~96--,'3t ............... 22'~-81- SYZ'S,-S1 14,42 S 22,84-W .... 27,01 S900, 1S 45 S 86 W 100, S89S,89 ..... :~: 44,61 S8S0,89 15,95 S 44,64 W 47 40 100. 4~62, SS 215,28 215,35 W 218,29 ..... 4'000, ..... 16'45 S 84 W 4100, 18 30 S 85 W 4200, 21 0 S 83 W ...... 4--~00, 24.45 S ~2 W 4400, 25 45 S 82 W S---5,7..4~ E .... 6, S 35 39 E 2,45 S 19 ].6 W 3,25 S 57 44 W 2,01 S 70 21 W ~,~.~'~ '-'= S 75 34 W 3,05 S 78 11W 1,78 S 79 37 W 2,59 S 80 15 W 3,77 S o~ 36 W i O0 4-500, 26 0 :~ ~':-: W i,u, 44o.~':.,-.S-1- .......... --.,.,o-,-484..:,o"-:"-"-',3t~, 41,76 .::.~ - ,,_,,,8,57--W -26i,92 404~,18 301 U8 4479 1L-; 47 ~" S 301 98 W 30..,,75 4600 26 0 c.'; 82 W 100 4700, 25 45 S H1 W 100, 4632,16 345,03 4':'69.., . ,1o 54,31 S. 345,14 W 349,..8 ...... 4-800, ....... '26 ............. 0 ....... S" 82 W t' 00'~. ...... 4'7--2-2--,-t-S---~:38-8-,'.J:? 4659.' 1'S .......... 6'0 · 76 .::, ...* oo-,.,---o 0-- W ........... 3','-S-, 02 4900 '"' ' 9° ~.o 0 S W 100, 481o,01 431 57 4-/49,01 66,,qA S 431 71 W 436,86 · ,,. ~-. S 80 50 W 0,''''~''' ,& S 81 0 LO 0., 00 S 81 Z W 0,50 S 81 6 W 0~C:'~:-,~: ~.q 81 1~ '"' W 0~ --5000, ...... 25-45 .......... S--82.-W ..............tO0.-,---4-9-01--.-,..-9-9---47-4..,~-77 4838.,,...:-~19 .............. 7.2., 93. S ..... 4-'7.-4 ,-9.2-W ....... 480,,.-49 S 81 16 W . 0 , 25 5100, 26 0 S 85 W 100, 4991,96 518,12 49'28,96 77,87 S 518,28 W 524,10 S 81 27 W 5?00 26 15 .c; 8o W 100, 5081,75 561,98 018,7 81,71 .c; 562 14 W 568 05 S 81 4.4 W 0 '-'=' .... oSO:J,. .,6...4... ,~ ..... ~.:6 W ............. 100, ............ .-1--7-1,-~-4 .............. 606.,..4-. ._,108,24 85,21 S 60&,.63---W .... 612,58 S 82 0 W 0,67 5400, 27 45 .q 84 W 100, ~760,14 A= ~; '='~ S6 6.,8,31 S 82 1.~ W 1, ..... ~ -,2,05 _ 197.. 14 8~,,~._~"~(] ..<:: o~.~, .~ 4 W = '~ --5500-. ........... 28-45 .............. S-.--85~..W ............... 100, ......... 5-34~8-.-23 ............ 699.,1A_. ~.~o~,.~..=~'°= o-~ ........ '~',a,74S 6-99+.35-.~.W ....... 705 · 60 5600, 29 15 S 85 W 100, 5435,69 747,44 5372,69 97,96 S 747,64 W 75'I,04 5700, ?~ 30 S 86 W i00, ~o~ 03 ~.~,83 796,34 5459,'~o~ 101,81 "' 796 55 W 803, --5800 ........ ~¥-..4~ .... > 86 W 100+ ..... 5609.76 ........ 845.64 5'=46+/~" 105,2A S 845,86. W 5900, 29 15 ~ ""=' , '_ , ~' 894 94 W 901,57 .. bo W 100, 5696,79 894. 72 ._>~ 2~ ''~ W 1,11 :::;82 S''~,W 0,50 S 82 43 W O, S 82 ,54 W 0,25 c:; o3: ~ W O, YO 15, WELL NO: 3 GNS JOB NO~ A0482G0425 TIME DATE ~RUDHOE BAY, NORTH SLOPE, ALASKA DATE RUN: 2-APR-82 14:28~05 29-APR-82 TRUE IEASUREO DRIFT DRIFI' COURSE VERTICAL VERTICAL SUBSFA R E C T A N G U L A R C L 0 S U R E BOGLEG LDEF'-T-H .............. AN. G L.E.-.i) IRE C T-10 N_I,..E.N[LT~L__DE F'/I:H ........... _SEC.Z IO.N .................... TJJI) .................. C..-0- 0...~.. R-,.I) ...... I ...... N....A-.-:T-~S-_I:LI-S-I'-A N C E ..... B.IR E CT- I-0 N-S EV F..'R. I-T Y FEET D M I) FEET FEET FEET FEET F E E'l' FEE]' D H DG/:[ 0OFT 6000-.. ........... 2.9 ........ 0 ............ S.-SS-W 1-00-..----52-84~.4.5 ........... ~!4.-Z.I-1 .... 5Z21._.1.5 ....... 1.lA.. 21 S ............ 9-43+35- W ...... 950.24 .... S.-83 ......... 6-W ........... 1...00 6100. 29 0 S 88 W 100, 5871,61 991,22 5808,61 120,12 S 991.47 W 998,72 S 83 6 W 0.00 6200~ 28 45 S 84 W 100~ 5959~18 1089~19 5896~18 125~58 S 1089~44 W 1047~00 S 88 7 W 0~54 --.630 0. ............. 28 0 S..-84...W ........................... 1.00 + ......... 60-4Z.~-1~6 ......... 1-086+4-4 ..... 598.4 ....16~ ......130. ~ 55 ..~ S ........... 1~086-~-Z1-- W~O-9-.+ 5 ~ ....... S - 8 . , , z=' 32 '2 -=;, 6~00 27 15 S 83 W 100 61~o,76 11 ,50 607 ,76 13~ 80 S 1132,78 W 1140,89 S 83 10 W 6600,.<.6'-'' 0 S o= .... ~. 6 1,45 145,'y8 S 1~..-, W 1230,70 S 83 11 W 1,16 o~, W 100. 6314.45 1221.7c~ z~,~'~ vv.o 02 6700, 23 15 S o= ~- 49 °7~ =' ~:" " ,J.~ W 100, 6405, ~-o 1263,71 6342 , ~.~ I .. ¢~ W i ,So S 83 15 W ,75 --6800, .........21 1-5 ..... S.~.-87.-W ................... fO-O-., ..... 6-4-9-7--..~90 .... 1~S00--,~-98 643.4-.-,~9~0 ......1~5.2-,25 S-.1301.,29---W .... 1310,-17 S-.83-.20 W ~ 14 - ~ · - 5-.8 6900, 19 0~F; 87 W 100, 6591,79 13~5,SS 6 z ,79 154 .... Z000.. ............. 1.7 0 ..... S.... 89-- W .... :[ 00~,;:. ::,,::,~686,8 ,¢::::_ ¢~3~6,~ ~:~:::: :;::68~;:,.~ ~, N 89 W 10 :::::::::::::::::::::: 78 ~, 8 ~ I ~ 9 ~.. :~0 o / I .... 8 S 1 ~, ~, I ~ 1 .. 94 ,: 7 ~ W 1403 32 S 8 S S 9 W 1 37 7200. 1~ 45 N 88 W 100,.:::--:B. 879.o~ 141~.~8~J: 14~0~17 W 1428 54 o 8~ 48 W --7800. .... 12. SO N -86 W · lOv + ~: 444::.~ ~p ::: ~.::< I~:A:~.~::: ~. 7400 11 1=; N 86 W 100+ 70/4,77 1468.0.~ 14oS,~7 W 1471,~x S 84 5 W 1 25 · 1 ,..V..J 5 .c;.. · .", ....... · 7--500.10 0 ..... N 86 W ............... 100.+ .......... 7.1--7-.S-,.06 ............. 1481.45 7110.06 ='"' ~:' ,.. 14ol-.76--W ..... 1489.-39 ,_.c84 1°~. W 7600. 9 0 N 83 W 100, 7271,69 1497,88 72.>.08.69 148,97 S 149'8,19 W 1505,58 S 84 19 W 7700, 8 0 N 82 W 100, 7370,59. 151~,~..54 77507,59. 147,04. ._. ~ 151'>~..o4 W 1519,97 .cz;84 27 W --%800.. ..... L..6..-30 ....... N. ..... Y6-~.W ............... :t;00--, ....... 7-4 69.-,-78----t--5 24..,-¢3 ..... 74-06-,-78 ..... t44-,-6~. S t525;, 23-W ..... t53;2-, 07 S 84 55 W 7900. 5 45 N 76 W 100. 7569.21 1535.29 7506.21 142.05 S 1535.58 W 1542.13 S 84 43 W i · 25 1.12 1,01 1.68 ...... ~,.O. uO+ .................... o-.-4,., ........ N........7.6-W ........................ i-O0...,----Sz668-+-7-:t-- 1-,~4-,~-.+C-1 ,.,_,0.~.......1 ................. 1..~,.,--+.6-_,... ,.. ...... 1,,4~ ,.SOL.-W .......1='"':''~ :'"' S 84 ._,,_,.~.-...,., ~. 0 W 0.00 8100. 4 0 N 64 W 100. 7768.34 1~'5'~ ?-. 84 58 W 2.02 ~. 9'9 7705.34 136.~-¢ S 1553.27 W 1~.:~.-.o . --.' . + · + . I.':.; F.:~ , · 8200 a 45 N 64 W 100 7868 11 1559 07 7805 11 133 76 S 1~9 34 W 1565.07 S 85 6 W 0 .,:.-.. 83.00. ............. .7,.......~0 ........... N-54..-. W .............................. :1..00.---7-9--&7-....9-1- ........ 1564-.49 -7.904...-9t .......... 1-~0.51. S .........1564.-76-- W ....... 1570-.--19 S 85 t 4 W - 0 . ' '" 8400. 2 30 N 54 W 100. 8057.78 1568.73 8004.78 127.44 S 1568.99 W 1574.16 S 85 2:1. W .--8500-.. ................ 2-3.0 ............ N-6."5.~...W ........................ 100, ........... 8467-.,.68 ........ t572,.4-5 81.04,68 ...........t..2~;,t6 S ..... t572,7t-W .......... 1--577,68 S 85 27 W 8600. 2 0 N 45 W 100, 8267.60 1575.62 8204.60 122.86 S 1575.87 W 1580,65 S 85 33 W 8700. 1 .45 N 4.5 W 100. 8367.55 1577.9'4 8304.~.~'"; ~'' 120,. '55 S 1578.18 W 1582.~/_ 5-' ~-",'~"1... 38 W --8800 1 45 ...... N S5.-W 100. ............. 8.46-7..50-: ...... 1-579.-,--90 8404,50' 118...~.1 S 1......o0',"t4' W ...... 1584,56 SU..,'"'=' 434 W 8900, 1 4.5 N 35 W 100, 8567.46 1581.66 8504,46 115.71 S 1581,90 W 1586,12 S 85 49 W 0.39 0,86 0.25 0.¥0 0. O0 i~S 1~'..,, WE[_[_ NO~ S GMS JOB NO~ AO482G0425. TIME OATE ?RUDHOE BAY, NORTH SI_OF'E, AI_ASKA DATE RUN~ 2--AF'R-82 14~28~05 29--APR-82 TRUE IEASURED I)RIFI' 0RIF'T COURSE VERI'ICAL. VERTICAL SUBSEA R E C T A N G U L A R C L 0 S"U R E DOGLEG E'F'T' H .......... A N G L E' D I" R E C-'T--t 0 N-- L-E N CFT-H ..... r_~ E F:T-H ........... SEC T-I 0 N ........ T-.VD ................. C;-- 0-..0 R-ti; t.- N -,- A.. T-- E>-S--D-I.S-T A N C- E ....... [ -t-.R E C- l -I 0 N .--. S E V E R t T Y FEET D M I) FEET FEET FEET FEET FEE:T F'EET O M DG/1OOFT ....... 900'0' ~ ............... 2 ......... 0 .......... N'--S 2-"W ........... t"0'0-,----866-7-~"40 ...... t"o 8-"'S-', 4-"7'- ....... 8604'-,-"4~' ......... '-I'-t:Z"'~" 78--'"S .... t 5'8S ',' 7 0- W ......... 158-7--~- 7,..' .... S--8 ~.," '"',-,~ ..... W ............ ~,8o.,06 W 1588,,86 '? 86 .~ W 0 6S ~7040~4 109,78 S 1'~' ~'' 9100,~'") 0 N 14 W 100, 8767,S4 1584.83 '~' 9200. o 0 N 14 W 100. 8867~ -')8 1~"'"'~'- 6~ 8804 28 ..... · ~o.,. · · 106,39 S 1..,o.~91 W 1589~47 S 86 10 W 0.00 FHE FOLLOWING STATION IS PROJECTED FOR INTERPOLATION VALUES~ ~S10 MB - TI) '.2 0 N .... 14 W ................ -1--t-~-~ ....... 8¥'-x-7'~-~..---~ 't--~N~.~.-~. o914'~-~1 ............. 1-0~.:--~6'~ S 1,_,o608S'--W ....... 1'590+-15 S 86 18 W 0 O0 ARCO ALASKA INC, DS 15, WEL. L NO~ S GMS ~OB NO~ A0482G0425 , , ' , ~IZ' C:" l..~, .... , ' + O_ :, .,_ GMS, 0--~200 ND, SURVEYOR~ MILLER GYRO NO~ 5~, CAMERA NO~ 1629, S4 DEG A/U; 215 i;S 15, WELL NO: 3 GMS JOB NO** AO482G0425 TIME DATE ".'RUDHOE BAY, NORTH SLOPE:, AI..ASKA DATE RUNe 2-APR-82 14,+S3,'24 29.-APR-82 MARKER TRUE SUBSEA CODE MEASUREn VERTICAl_ MD-TVD VERTICAL R E C T A N G U L A R C L 0 S U R E VERTICAL. ............... N A M E ..................... ,.O EP~T H ............. D EF'-T H- ........ D~t~F:F- ............. D-EFW-~ ...... 6'--8'-O-'R '~0 ....... t-N-' A""-T--E-'-S~B-t-~T-AN 6 E- --D"I~R E C-T-t 0 N- ~T- Ht C K N E S S FEET FEET FEET FEET FEET FEET D M ORIGINAL G/O CONTACT 8962,00 8629,42 S32,6 8566,42 114,02 S 1583,02 W 1587,12 S 85 53 W ~G/O CONTACT MOVEMENT 9052,00 8699,~8 ~32,6 863&,38 111,95 S 1584,14 W 1588,09 S 85 57 W ~PBTD 9270,00 89~7,'24 332,8 8874,24 104,02 S 1586,50 W 1589,90 S 86 15 W ' 'TI) ...................................................................................... 9'3-1-0T00 .... 8-9-?-7 ' ,'"2"-1- ...... 3'3~2-',8 ....8-9"'14"-,-2-'t-- ........... -tO'2-",'67" 'S ....... ~'586",8"3--W ...... 1-590-*-1'-5-~S'--86-18- ~ ................... 7173' 6686 · . . -tN, _ . - j CONTR( '.LED DRILLi G CONSULT "ITS ..-,-~ ' 7608 Highlander Drive ~' Arlchorage, Alaska 99502 Mgr~b 25, 1982 · · · ._ . .-.- Mr, Jack Messier .- . . Arco Alaska, IBF~ ::'-"":':'"':'"'. '" ' 'p,O gox 360 .... 9950% RE; Magnetic Sil~g.le Shot Survey Job No, 0382-021 Well Drill Site 15 - 3 Prudhoe Bay Field '-' · North Slope, Alaska Date of Survey; 3.9-82 to 3r2!-82 · , .·_ ".".~' Please find en¢lose~ .~he "Original" and six (6) copies of our ' . . .' ...... Mag~et%~ Single Shot Survey on the above well, The method used .... in calculating th%s survey was ga4iqs of curvature, The depth ... *%.i *~ *"-':' ' ' ~ ~he ~grvey was 2673 to 9074. t~?.h;~.~.::;~:~.i?.7..;?:.~/~:;' i'·~i;~·~:.~i:~:.-i;-.",~',~,.. .... -.,,...,, . . Thank you for giving.us ~h~s opportunity to be of service, yours very gvulY, . · ., .. · Controlled P~ill[ng Consultants . -;.2 , o. ~.~'d-/-z--~, d ;/3_~.....~:_/ , . '/'-?;::- ' '. ' i ' ".:' '7: L ' At,on ~uapman ~ ,>... '"ARCO .ALASKA, ]:NC ...... ::' '!'' '"' '" ?":'"'";::!": ''' ...... DRiLLSITE 15 WELL RADIUS OF CURVATURE ?4ETt~OD OF' CONPUTATION CO'4PUTED FOR CDC .BY FH L INDSEY & ASSOC. .SURVEY DATE 3/12/82 JOb 3B2-09 RECORD OF SURVEY : MEA$' 'DR ! FT VER T ! CAL -.- '::SUB"-:?:i....::.:!: !i'!-i: D[~ ] FT :"i~i'ii :'::'TOTAL COORD ! NAT ES '" D M DEG. CLOSURES L) ~ STANCE ' AT;GLE D M DOG LEG S[::VER I TY DEG7YO'~FT ..... O I-STifF; CE---- 2673 0 0 2673.,00 2610.00 S OoOOE 0,00 S 0,00 2911 1 45 2910.96 2847,96 567-00E 2-86 S 1.89 E ~I5~'1-~~'15~~'0~'~~57-0';~0E':-..::.:: :. ~5.';~' 5: ~.;:- ......-7'FB3--E ..- -. :--.::':.'3~ '~, l~ ' ~32.~ :'?.:,-/'"::;~::::~'~-E'~:':--':'.-.:;- i 3704 10 O 3701.70 3638.70 NRg.0OW 15.88 5 27.38 W 0o00 ,,5 0 0 0 W O.i.~O0 O.<,"u 3,43 S 33 29 59 E 0.736 -1.79 9~4D-5-"5~5-2 I-~-~';~05 -- ~7~-- 2.03 $ 47 3~ 31 E 0,608 -8,59 4,22 S 12 .6 58 E ' 1.474 . -2.5i 1.65 S 59, b2 47 w 3,050 27,9U 3828 12 30 3~23,31 3760.31 588.'00;v 16,09 S 51,56 W 54,02 5 72 39 50 W 2.019 ~~-~--I'5----B'~ ~~~xTcr,-O~OW': '.'-:.':;::.::~ ~ .: :,~ i 0 .,-46 ..:~ 5 ':: ======================= .'t~~ 7 ~-;'68-5-'-~5~ U~ ~T;'q ','?:.::~o i 2 i ~' ~ :': 4oo i. 4~-:'::::~ 7:;:~'~::::s??;:?~;:~7~, ~ :~ .~ ::::::::::::::::::::::::: ~.,~ ~' '.s 7 ~0 .2 w · ::. ~. 7 7i ~i°° i ~ ~o ': ~¢~. ~e ~°2z'''~2~:>::sr~'Oo~? ::?./:..~4 . ~oS '~i.: o ]~ w z.o4i -~i~ ii :~o :"~,f~ ~,iio'~~' s~"°u~ ..... 'Z'i,~9's-:'' i~'~:"~:; ..... i:~~-~?,c~ - ' ~203 24 30 '~2S5,56 4192,5S SB~,OOW 24.32 S 190.69 W 1~Z,2.4 S ~2 4~ 49 w 3.393 4737 25 30 4667.02 6545 26 30 6267,93 6770 22 '0 6473,03 6410.03 589.00W ~'6-- '0 · 6768,~4 4604,02 585,OUW 46,04 5 381,32 W 384,09 5 83 6 53 W 0,224 .'::::...::: :ooo.4::::::::s: ~4'::. ~: .~: ~, ::~o. :7: Dc)ZBJYI 506,0ow 94,DZ'5 l()-ib,8: W ..... 1079:9~~'~-:"'"W ' ' 0';:72 6204,93 586,00W .104,50 S 1218,46 W 1222.93 S ~5 5 53 W 0.b63 108.53 5 1310.75 W 1315.23 5 85 16 .. 0 W 2,009 10:8 ..v ~ :~:$ :7:;: 1412'~'~ .. w : 1 ii-6~?'~'S'-BS~-b~Z~-:: 1 · ~ 52.0¢3 _. 73-,~.--- : ":::: '":' '~-/'. 2 124.54 i-5-5'76-8--- 1")1.40 382.6b ..862 · 59 . . i 0 7'~~ 1221.26 1313,65 '~.. .. ARCO DS' i'~.'~~' WELL SINGLE SHOT SURVEY JO[~ 382-09 2:5 MAR, 82 RECORD OF SURVFY TRUE DEP Ti-t ANGLE D · $L7[$ DR'I'F'i ..... F'Ol-~-'k COORDINATES C L O--S--U-R ~ b SEA DIREC DISTANCE Ai~GI.E D(ZG, D Fl DOG LEG S-EVER'I-TY DEG/iOOFT D! .S T A~'~ C E 7551 9 90 8271 3 3O ---9-g. T~- -2 0 [~,OT T O~',1 7225.06 7162,06 NB~.OOW ':. 102,2D S '1515,61 W 1519o05 $ 86 B 28 W 79t~0.10 7877.10 N66.00W '/..]-.:. 81,23 5 1593.96 W 1596.04 S 87 ~ 57 w CLOSURE 1621.26 FEET AT S 88 4 38 w 1,.389 0'-~-1-8-7 lb95. I'6-ZI-F26 ~ ..^ ~CO ; ~qEASURED 15 wE£L' '3 DEPTH AND OTHER DATA FOR EVERY EVE/4 100 FEET UF SUB SEA DEPTH, :' DEPTH · . . TRUE VfTIT TTC-AE--SI~t~'" DEPTH SEA DIFFERENCE CORRE CT ION TOTAL COORI:~ INATES 163 263 3'$ '3 56'3 66'3' 763 563 9-6-3 1063 1163 1363 1663 I 56'7 1663 1763 1963 2053 2.1'6 3 263 363 963 306 3 3163 3263 363 2 2 : ' 2 3 163. 100 0 263. 200 0 ¢-63, . 37.)0 ,... 0 ,'+63- :-.' 400 ::. 0 . . . 563. - - 500 "--::-0 G6-~ · dOG O 763 · 700 0 fl 63 · 800 0 O 0 1063 · :' :':'.' ..1000 . .?.:.." 116 3 · :.:' 1 ]. oo'.:.'.~:;.'::;' 0 :'. "':i;':::"<:'::/: ;'"' ':'":"::': o'' '"'.:. .... :;::':ii: ..' ' 126~. -;-----T2UO' (:; 0 1363. 1300 0 0 146.3 · 1400 0 0 15-~3 · _:-:.'. 1.'500 '....'. :-~ .- 0 .:::::,~:.......:'. -O -.. ;:- 1663 · :':';-:: 1600'- '-'!::('!;'':'.:''- 0 ::.':; .:.;'!-" ...:.. :i". '::...::" 0 1763- 1700 :': 0 '" '::':::'::'."' ' ':::'" :"::- 0 ~': - ..... ' ' - i~'f~3'"; ' i ~f0O ...... U-- 0 1963 · 1900 0 0 2063. 2000 0 0 2 T 63 · ....:. -- 2'Y O O ::..,:.:: - O .:. ,~..:.:.::::: ..... ....:...: O :'.'.-'i...;-(:.': .:..:,.:::.: ::'.. 226 3 ":": '; ' ' ';;:!:'"~::" ':: ' ':'"";';":::::"'"':/ "" ":"" (::: ''''!':" '''<''~''::''''' ' ::(:!?'-:i.'::."" · · 22(,0 ....... .. ...0 ...... .<..::~.-.' ..:..' .---:.-.'. 0 ..-'. :'. ;::.:. !-: ....... - . 3r~0 -.- ":::..'.." '/?':.' .' :::. '.. :.. ;::):'-i.:: - .?:.- '. '.;!!~.~:i..':2:..i.:'. :. 2363, . 2: ~ ' .... ':..-. 0 .'.:.- ..... : .:. ::O .:..-:: :." :.;:.'...:.-.:'-' . 2 ¥;63 · ' '2~--0-0 O' -- 0 2563 · 2500 0 0 2663. 2600 0 0 0.00 S O.[;u S 0.00 S O.OO S 0.00 S O.00 S .0.00 S O. O0 $ U;-O'U o O.O0 S 0o00 S U; UD---S O.OO 5 O. O0 S U';~OU-S O,()0 S 0o00 S " O* O0 S O, O0 S O,uO S O.O0 S O.O0 S 0,00 0 · (,; 2~a. ::::::::::::::::::::::::::::::::::::::::::::::::::::: : 9~, s 3163. BIO0 0 0 5.27 S 32&3. 3200 0 O' 7.61 S o-;-f-f--~: 1,00 E 3.31 E '5-;'a-i"-E -- 7,99 E 9.02 E 'O ..... ;: ': 11.06 S 6.50 0 :.- :-.... 14.96 S O.a6 0 ' . ..:...:.. 16.81 S 8.22 ARCO DS 1.5 Wi:iLL 3 £INGLE.: SHOT SURVEY ~,~EASLJR[:D DEPTH AND [)TilER DATA FOR liVERY [VEN log JOB 382-0 g Fl:ET [,)ir: SUB .SEA DFPTt-i. NAR . :. ~ . kt E A-SURE [:~ :' ' -"' ---" DEPTH TRUE ' ' ' ,VE,qTTUA L" ~ SUg'~FY---TVD < V'ERTI-C~ L . . D~PTIJ SEA DIFFL~,,,.[NCE'.:. ':-'CORRECTION · · .:j - . . . . '--. -". TOTAL :.. . .. COORD IRATE: S 3&65 3766 . . ... - .! - 3g72 · '" ~' 4076 q 401 ..:.. · . 4622 " 4732 ~ 4~'3 4 955 506 6 .. 5~-- -4: 4':"':.. 5290 .... 5~02 585 8 - - . 5973 6Q~7 6315 6427 6-5'Z9 6650 · .. ...... . . 6759 68-6 b 6972 7077 7284 738-6 3663 · 3600 3763 · 370(} 3963. 3900 " . ' 4063, 4000 q'-I 63. 4.2.63. 4200 4363, 4300 1 3' !-'..:.: i. 13 28 " 3 '6 9 10 4,-, ~s ~. - -.:..a 6 o o: :.':-'-..:.!;:: 476~~O~'O 4~63. 4800 91 11 4963. 4900 103 12 D'063-;--5~0 .-: .-.i 1 z~ :::-:; ,..'.- .. 1~' 526s.' :'-' 5zoo' :'~:<~::'1139 '.::;:.-':"<.:.':::.'~:: :.:. '~:.'z3 5463. 5400 166 14 5553. 5500 180 g6'~F-. '- ' 0 · _...96,0 . :-. :.:,'195 s 7 ~ 3. <-':;:::'57o:0" '"-:'~ 5~63. : 5800 ::':--< ~24-_':_. 6063. 6000 252 14 16.09 S 20.98 W 15.83 S 38,81 W l' 6-g"54'-'S' 60 ;'~4 ','~ 19.26 5 i16,45 W 2-I~ I~ --151 ~z, 67 S 193.99 29.57 5 239,59 3 fi'; 72-~ ..... 2 85';-5~- 40.15 5 332.40 45'78 S 379.19 57~3~- S .... [C2 56.21 5 475.52 6C). 39 S 524,28 - 573-;-9 9'-~ 624,25 675.51 -- 72-;; 7 8"-S'----728';-3'3"--W 70,22 S 752,.55 W 79.95 S [;37.93 ~' 83~3'-5~=-- 894727 w 87.13 S 950.32 W 90,]6 $ 1005,62 W g3V'~5~ ..... q~T6O'FI-9-7-I 97.17 S 1[13,63 W 6163. 6100 264 12 1(:,0.79 S 1165.51 6'26-3: -'6'200 ..::: .2T61....:..... 1'2 ::.:..::'.:.: e36s '-~,3oo ':,::.i:.:.::: z~7.:?: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ,. :::.:-:i:' :':' 1 o-?, ~4o:: :. '~,~oo ::::::::::::::::::::::::: ::::::::::::::::::::::: ============================ ::::::::::::::::::::::::: 6563. "6500 .... 3U3 7 lO~gb S ' 6663. 66n0 309 6 108.96 S 1380.16 6763, 670{1 314 5 108-56 $ lq10,92 6~-,~, .... --- ~.fO'O '.:"::'.:'-.~ 18 :'-..':.:':'-...?:::.:<-.- - :'....' . 4'..' .' :.:-' :.:.'-: .... ..:::-.- I-0-?';"~-4' 'S '- IW-3-B',--gU ~,~6$ · "-'~ 900 .7063. 7000 :'; '~:: '"':::::'::::'::'" '"' ' -::'"-"'::' ':]:::-<: 106,70 S 1463.20 .::,...3~ ".':":'i:'::".' "': '2 ": 105.21 $ 148..5.33 ---~t('~O DS 15 WELL 3 SINGLE SHOT--$]]RVEY MEASURED DEPTH AND OTH~.R DATA FOR EVERY EVE,N lO0 JOB 382-09 . . FEET O1= SUB SEA DEPT~t, :-"i;:;:-i", DEP Tli TRUE VERT I CAI. DEPTti SEA DIFFEREN£E COR R i:. ¢ T I ON ...... TOTAL COORDINATES 74-:3; 7589 7~']. · :_. - 7792 ... 7~92 79~.~.-3 8 09.3 8194 ~-294 8~94 840~ 8 (~ 95 8795 'B'895 8095 7163, 7100 325 7263 · 7200 326 7 3-G3 · ' 7 7/4- 63 · 7&O0 329 7563, .7500 329 7 '66 3 , .... 7600 .... ~-~) 7763, 7700. '- 330 7863, 7800 :331 8063' '--':".:,8000 ' ·331 8163,, 8100 "' 3;}1. 82'fT-3 .¢. 8 363, 8300 332 8463-, E400 332 a-5-6'~; 8663, .g600 332 03.43 $ 1504.83 W 01.53 S 1521.7:3 W 99'J3'1-"~--1-53'7~'06' w 96.67 $ 1550,72 W 93.69 5 1562.7~ w ~7.]5 S 1582.13 w 83.75 S 1589.42 v, 7'1.90 S 1'600,43 W 74,84 S 1605.05 ~ 68.0b S 1612,56 W 64,/+5 5 1615,43 ~v '~0' ;~'2~-S ..... ]1-6'17'; 7 ~"-~ 57.20 S 1619,40 W · ' :: ...... : '-': ': '"- :-" ";'..:;:" 'i::- -' ' "' ":' ARCO D,S 15 WFLL ~ SINGL£ .SHOT SURVEY JOF~ 3~]2-00 --)..7¥'-' :: ' INT'i:'.~-FGLATED VALuEs FOR LVFN leO0 P'tEE'Y OF MEA3Ut~ED' DEPTH. I.,'F. PTH ',~ 1000 2000 30 O0 TRUE V ~.-l' I CAL DE P T t] SEA"' TOTAL COORD NATES · . - ... 5000 6000 7UUU ,RO00 9000 1000, 937, 2000. 1937. 2999. 2936, Y'q~¥Z-'--'$ 9 2 6.. 4903. 48,40. · 5786* 5723. . 7670 · 7607. 8668. 8605. 0.00 S 0.00 w 0.00 S 0.00 W 3.84 S z*.27 E 17-~-~;-~' S 93,97- w 57.99 S 'z~93,22 90.25 s ]5'r~.89 w SURFACE LOCATION IS' _ ....................... ~ ................... _. ........... ~ . ' ' 5'2'5" 26 2' E\VL, SEC. 22 : ~ . i -IN',!~':-:' .~. Fi .....ii.'' ' . i ; , . · · ....................... ::'~, i: - .i:' . :'! ' ,~oo ......!---: ....... : .'-I - i '' ~ , ' '' ',- ........ i: :':" ,' · ' ' ...... ; -- ,CA ..... --; ..... .YCT.TF:' ~-~-::--': :-'~':'T':'.'~'l :.: ~./. _~ .... - ..... :': .... Fi,., '::.~L~'VE'R'l' ._ j [ j' .... ~" ; ~"' =" i-~:.j'ARCO ALASKA, INC. ..1_ : .... ~ .... :.~ ..... : .....~ ~ :.~..~. ~ ~ ..... ~.-.v~_. ~ ~oo- . : ... ~ -_: ...4 ~ '-.t : '.;.:-! ~'t .' :' '. '. [~ ~, '. ' ' :'""'-DRILLSITE. I5 V/ELL L. ' ....... :_: ....... ' z :" : } :'-' ~-~-} ........ i ........ : RADIUS OF CURVATURE I ' ' . ' . ~ ' · ' : ' ' , - . ' ~ ~ _ .... ;.: ~ _.~ .... :_:4 ....I ~-: -~-.~'i ~ .... ',-t--: .............. I :-~ ~ - ] --: - MAGNETIC SINGLE- SHOT ' ~ .... ~ ' · -t -' ' . ~.: t_.-~-i .... ~.~_;..'...L .... :~_.L..L _~.Z.].~ ~ ........ I': ~'; L.:.:_ ~ : ,, . , . , ~-~ ....... ~... .:q-:.: '~- ,.~ ,,, ,.'., t, ' I, ~',~ i:,,.. :'.~...: t'~ . so~, ~ : ~ooo : ! ..... , :.. . . "' T-'-'- '~ : ............. [ ............ i , ~ T ' :'. '~- , ........... ~ . ~ . , . ...... ~ ............. . ~ --' ........ ~-'-, .... ~ ........ :-I MARCH 2]~1982 - . ' ~ i-: ' ~ ! - ' . ~ ' · · _ ' ~ '_ ..... ~.,J _: ..... ....:~_.~_~ ........ ] . _~ ........... ~ .............. I .......... I .... ~ ~_ _ ~ .... .t , · ! . ~ .. t.., ..... t' . . : I. . ~ .. , - , ...........~ ......: ......... r ........ I .... ; .... : i ...... T' ' ."" ..... ~ .... ..... : ...... :--~ ..... ~ .... ~ ....... :-t-: .... i--:~: ............... :.,.-~ ..... I-~.~:.- : ....... t : '--",- ' - ~ ",.--~--'"~ _ :., : , !_J , . _.'. : '.... . ..~ - .. ,.~ '. : ........ ' .-L ~ .... , ..Z "., ...... : L.I., i ......... ~ :- [.,_; . . I . ; ' , ' ~ · . I :- . . ! ' ~ ' ~ "' t ~ - ~ ! : I .... ~ ........... ~ ..... : 1 .....; ...... ~ ........... ~ I' ' Z' .... ~i-.:- .... : ..... ' ...... :.: '."-~':"i~ .... :!1 .... }':i ':.": '~'~':.:~ i"': :": .':":-:'ti-'"-' . ' ' .- ; ............... ~ ............ . .... · '"~':' , ...... · . , r ~ : ! ; * 1 . ' . · ~ ..... : ~' .... ":-l'"i : ..... ---;-- · r - '- [ .... : "':" ':-I ".'"": :'-l-': .... ! .... :" ' I : :":'-'~ i . ' ' ' "': ....... i': ..... :"'. !:'-!' "':' -::"~":'"".' ...... ~ t ....... ! ............: .......i .........j" .... -'.-f-! .- =_.. l _ ~ ~ I , .., ~oo :.' ::i:~ . :::: ~':':'~ ..... : ..... ]- '~ i I ' I I' ~" -"' ':' · ' -' ' - ' '' . ..... : .... ; ...... ..... , ' ! .. J "I ........ , .......... : ........... ~ ........ ~ ":-~' '";" ' ~ ' ..... .... l ~2oo .... ; ..... ALL DEPTHS SHOWN '"-~ ............. i ' ' )" ' t ..... [ ......... i .... ARE TVD : " : ' :. ' ' !. - '._] ......... _-: ............................................................... ' .......... :.L_: ....... I .......... :~-i- '-'] : 5600 ........ ~" i. -. i · - : ~ . ; . , . ~ , ...... . ~ . . t -,~ i- ~ - I , .... : :.:i.:/:":":.':.'t:. '.'-:i ' :',..':.. :.t i-'.~.:~ .... ' ,-;' ~ ........ ' ' ' ' ' ' .-- t ~ 7 '.-"~T_.:'. , ' ............... .__i ........ '..L.L.- .... .'___L..:'_L_L:'..-:_.'._' .' L ..... L..~ ..... L ..... _-_._t...'.2 ............ ---- 4000 ............. ,, ...... : .......... ~ '' ~ .... i : :: ~ t .... ': .......................... ~ - : ........ ~ ............... ~ ! '~ :'' t ' -' !'- · i i ' -..- I t ....... : .- /,~ . ~.oo ............... , ....... ~-.'-' :': ' ' t l: ':.: [ :'. · __ .......... ~ ....... . ................................. ~ ..................... ~ .......... i .... ~ ..... ~ ....... '2;. ..... -..~ ............... ......... .i- . . .~ . t ; . . , ... j . .1- ..... f ...... ~~:'".':"~ "' t': '.: ...... : ''' I. . ' J ~. .. -I .... ' ...... ; ....... i' ....... !. ':' ..-~".... :-i ! ::'; L..~ ~"" ~ " ~ ......... .......... ~' ' ~ ..... ~ ............... i':- ' "i ........... ~ ............. i": .......~ ...... ~["'~:'i - ' ~ "'~ ..... ~-' '" ~ .......... ' .l L~~ 1 ...... ' ........... I--':-'..? ~ .~.:-!,: '- ..... ~ -'- j I. : . ::,: ! ..... :.':'-:...'~:]'~:'r" ' :~ · ~: 1. ~ · · -- ~ .... i--- "':':::::-" J.':;?:'::::~. ....... , - ;":"~.".',": ' 1 ....i": : 1:"'~":! :'-' I . .... , ' . ..... i'''''~'~'['' I "'. :, :' :~ :"~'"! i"? ~ . ..... ' ..... ' ........ , .... ; ...... :":'" ~ ' ' ~ .... ,~-"''' j ' '" t : ' } '--',' ............. ....... ~6oo -':-- ....... -,t-m- ............ : ~'"-!, ~, ..... "'"'~ ........ ; '" . {:.i,' ," ..... ~'' ! ..... i-- : ~ : ........... ;":'~ ........... , , ~ , "* ' , ." t ' ' .... L ' ' '' I ." --I-'" .......... j ' : ....... I - ' ............. J .... ' ....... :'"'~' ..... t~ } :' , . '"' J · ..... ' ! : .... t .' ---i .......... ~ ' ' ! , '" , - , ~ ' ' ; ~'- '"~"' ~-~ 6000 ~'~ ''~ ...................... -: .................................................................. ; ............. : ' ....... :-~ ....... ' ,. -.;'-.i- .':' ~-.i.-~ ~-. ,.I-- i ......... ;: ,-:--::::.: , ......... , ......... -:..:..~ ..... i':~' · t" . .... ....... . - ! · . 6400 i ..... t ' ; ' i " ' t 680 --- t ..... i .... I ' ..... ' ...... __-__ .... "' !~ _ , ..... . ' - ' ,' ' ' i t j . ': ''! ' ' il ..... TT ':,-.'i" '.-':-'Vi ..... -' i:"': ......... = .......... ,' ...... .". 'r ..... ; - . , .... .... - ' -z- '' ~ .... i: "-'..'. t.'i .~ .. 'j :'.;.' ..... ~ - - i ' ~ ! ........... 1"'"-i": 1...' · · .......... : 7600 '1 ................. .-. ..... :'iT'7' , ' : i" ' ' " .... : ' ' ~ .... :' ~ ' ' ' ' .... ' i' J' ~ ~.. .., - t. ! ~ . , : .... i · ' ' ' ' : ' ' : ' ..................... '--' §OOQ ............... , ! ,"7 ........... ~' ................................. , '~ ............ ~ ~ ;:i :'..' ........ i. . . 8400 : ' ' ' :' :'" : ' ..' ............. '..L ....... ~ .......... ; ... ''; '' '.. ......................... ' ..... ' ' TVD = 8742' t } ! J ' : - ' I ' - '~ ' ~ ' ' ; ..... ! , t i . . . I ' - j - : J ' TMD = 9074' ' _~ .......... l .................. i ..... : I ........ 'i ..... -..- ,. : i ............ : . . . t ......... · ; ..... ~ ........ ·' ~:.. I .... ' ~; .... ' . , - . I . "" : '' ' ' .... ' ~ .... : t ...... ! .... j .... ~ ....... ; -..' .. ~ : · i.'-!- t-i---,;i!.. : : .... ,....!. i.. '~,:...-! ! ' ' ':'" "' ! ~':'" ' ' : ' : ' ' ; ' ~ t : r · "; ~ , - - . ' i. ARCO ALASKA, INC.:-:-: i .... , . i. !... ''~ ..... DRILL SITE 15 WELL ~ ! --i RADIUS OF~ 'cuRvATURE i '--' ' ' _. -.'-"MAGNETIC~ SINGLE- SHOT. _ , . _ _i :.SCALE:. I" : IOOO" _t ....... -:"[MA'RCH '21~,':i'982; "-"-~- I .... : '" · . ...... ' ....... -""~"':-" ;-; '-" : i .... '~'-'; ' . .... T- -' ~ .... ~ ": ....... ?' :-~-~--- .............. ~ ~ .... : .... i 7;'--',~'~'- '----'"-' i ....... i-7-,'-' 7-;" T.i.'_- ........ : .... :..~ .... I ........ i-~-,-~-T.-i--Z---Z/-'-~ .............. ~ .............. --- ......... :'.-:-;'~.i . ' ~ , . .. ,, · . . ~. . ~y:~: l ........ ,' . I , ' ~ ~' :, I''.' i '' ; ; ~ .' ! ' . ' · i , ' ......... ~ .... '.-' "~-'-"' i .... t ..... : .... _~ :_!.~,__!_:..:_ ',' 77-?. !-:'--~ .... l-:-,"-.-q ......... 7': .... 7 ;'": .... ?." .... 7-~ "-'"--' i ............................... : ---'[ ........ t ..... 4-, ....... I ................. ~-~ .......................... ~ ................... i ........ · _.'_'. t~..~.' ~_.,_..:_.__L.J '_ _:_' I '. ....... :.--~ · ~..._ .'.' . I . .... I ; "' i '-I ? 7, t' 7 :___I-"" · :; ' - ; ' : ;'. ; : -! ....... .i ....... :'5'i 7-: ....... ;' 7'".'7-,' .... I ........ ;--'r---'['T--: .... T" ................... :'I' '-;- ...... I '"'--,'i-! ........ : I' ....... I ....... : .........1 ......... r ............ ':.-- ~ ....... ~ ...... q ........... ~ ........ .~ .... : ..... '- ..... '1 ~ ' ' · - ' - ' . ' .i. .... . ..... mi ........... i'; ...........~ 7,+ .......... ~ ....... ! ..... i"'T .............[' ................... ~ ............ . ? ; - ; _ ..... ;'1 ...... ! ...... 7,' .... i ......... " .... : ..... t ............ ...... ;:.: :.-:'::: ":" ........... ........ ....... ..... ..... ..... " ........... ] :':1 ..... ~ ............. : .... :--!-1-~-~:: ....... '-':', ':-' ..... ---' [ ........... i .......... l' '----; ....'" ........................ i T. II N.~ R. t4E ~U M' -.--; : - : .......... ~ ....... ; 't ~ . , , r , ' '* ~ ' t , . - ..... · ',-. t ..... 't ..... ~ ......... .--T-''T "~.-"'-'~' ..... ~' .....l .................. .; ....... '~ ............ I .................... I ................ t .... ' .-. [~\-: '.'; ".!~-- .......... Z ? ....... .;._il ........... .~_.~ .... __J...... .... .....aM__: ~'-:'~_=_.~ ! .......... ~ ..... '.~.._L[..~ ........ :_.:._; ! :--~-:-~-.I .......... ,~ ! ~5! .......... i ....... l ......~ .... : .... t ....... :--.-l ........... ' ~_ · :.. , . , . '.._ ~ -._ ~_~ ~..._ ; ...~ :__ ' ' - ...... ! ...................... , ........ ...................... ............. .......... ' .' .' ' , : ; ~ ' :": I":': .."7 ...... .'.. , . ' ; , ' i ' . I .'' ~ ....... - ........~'". ...... : ..... '' ; ' ' -"-':'! ......... '"~" :;..2 iL"-': ..... i ...... t ............ ~'".""': i;":;'::;_.;:'-':'t ~':-':-:."i"-: !' !' ' :--;:'-;i---= ,~_~Z_-.L.:_--'..i_'_--...i__~_;_~_. -'- , ,_.: =t.;_.=:';"T.-._- I~i'_..~-.,--,_-:'~~'~'.-'._T....-t.Ti._..~. i';~_~~_' --.'-.-~.T.;i-.- - ~ .... '' : . t . ' 1 '. : , ' ·CLOSURE , f ' ': ' , I . ! '.-~-! ........... ~- ......... t-:.: ..... ~-'--:-: ..... :s88°05 w- ,~, -~ '~'-:~' .... ~': ......... t'-'-:. ......... i''~ .... :t .... ~ .... ':':-'-~'---/ -I ~/ ..... i ...... 'I- ........ : i'.': ........ t i: .... - '~': '. .... ...... .... ....... , -/-.?-. ..... ..... ........ ...... .... ...... : .... ~ .-: '; ,'i 7 .':'L' ..... ~ :,': ..... :':-'[ :- '-~ .... ;": '": ' . ' zsz' ;':': ....j ...... : .............. ; :"~.i. "' ...... :' ' i' ':--;-t--,.--~--f ........ f .... ...... 1 ........... I ........ ,.-.! ~-~-:-I"/:'- . ~ , ' : ~TVD - 8742 1 '. ......... : ......... 1 ................... t .... :' .......... .~ -' :_.~.:.I :.'._.;_. : ...... , ........ t. J , , : t : · .. .......... :... ., .. .~ ~ .. : . , . t.. :--~--!- :--~-;-..----.-~-1 .-=--;~ .;2-. ~ .-/1 '_ ' .- ~~~~-:TF:'~-' .'.: '.1 -- =~'::-'i .... .--7i-'~',.i~__.r.--.. -._ .--~-.. :q-:- . " ' ~ ; ' ? .... - -/' ~0~ O' o, ~ co .... :--,.I ........ -l-~--,.-~ .... I ......... ;-I ..... ~....;... ,~4oo 7t .,,~ _, o · ,,, ~. ,-,.,, o : .... , .... t ........ :..-; ! '.~.'.t -;.-:---: .... 1-: .... .:-. t ~ ..... .~.. : :-~ .... I - ,__il.l...;-_;--_{ .... L_ .! ....... 4..| ..... -~" i8000JI 'oo~ oo °o ~, ~ ~ 0 , · !_. l ..... .L.. I :-' ' ' L :.~-:--L-! ; L_;_._' '.' : .' . ..1. ' ' I " 76 ..-~ . O'-' O I .-;-~ -:..:-: t .... ;. ...... ~.~ _..; .... O0 , . ; ...... · :,!' , .. ,. t .., : t :. ,T ! t.'.-;--:.I '~- ..... T ............. ~ ........... I-'7 ....... ~-- ---,'----7. ................... r ................ : .......... F ~- .... ~ 7 ................. .......................... ; .... =-1 ...... ; ........ ~..i ...... ~, ....' .-.-i----.-:. ] - : ~.. '- ...... ~ . : .......... ; -~- ;.. 1 ............................. ....;..! .... ' ._ J. :--7 .... 1--:--:~'r':'~ '-'1 .... :" '=?" ,' ~'ff .... +"i'!-!- ......... r-'~ ....... t 7i--:-.-t I :'t : -;'i'~-' ..... :-I ..... :. ........ ~": .......... i .... :":':' i":!": ...... : .... i ' ": .... ~-:.--:-:"'!-i': ':-' l'_'-:_'-.-'_'."i-:'-"~-,-I ........ 7"! .... ~ .... ~":"~ 'I .... t'." :--'? ..... '"'"I .... 7'-,-~ i ....... : I-' ...... :'r': .... ' ...... ',"~' '- -' : ..... ~-- :--- : ......... '-; ;-. · f ,' : ' L : : ' ~ ' '-" ' i ...... "7 ................ . ':"7':-"I .... J"-' ........... ~'-" ...... J .... :'.--"-F--'-':'" I' ".'"'t :, ...... ~'7 I ='T":"i';"7-:": .... ;' "', :'-i :' · 'I ...... L:.':--'~-':-":;'! .... :-'I-': .... ;':':'" '1 .... ~':~':'~ .... i::1: ~':'-' ~"'':I'-: .... ~":'!' t ~ .... i :':"t ....... ..... , .......................~ ........... r ........... i .......................................................... '1---? .............................. T ............................ J ' . ~ . I ' I ' I "' I ' ' ' ] 7" ' ["F:" : ...... :"! .... ;' ' :':"'" : ' ............ j : ..... 't .....I ......... ~' & .... * '"~ .......... r t ....... + .. ; . ; . . . ' .... · :.,.J.~,..~-~. [ ...... :. IL..: ..... ~...: .... ; 1--~...' I ~¢~)r;".-~ .':L'----i-i~'..T.7771-I-T..'i-7:.--F-:-.,-:.'.Ti--.,__--.:.-.Ti~T:".-7[-:~-,-':"T '- · .; ~ ..h~: i J '. ' ' '-- ' ~ ' ' ' ' J ~. : i · : 1, , ~.' ' .... , ' , , . I . ,' .~ .' ..... ,;-, *: ....... ;..~ -..~-~ ............ .~.2. . ;... · ......... ' ' ' ' ' ~ ~ ' · ' t · ' :: ' ~' ''J ...... ' .... J : 't': ....... :"~'~ ,-.-j ..: -:1 .... ij ' :" i :'~ ' : i":"t : :'~ '-' '' .....j ¢* ' -~ , . ' ~~ I * , . ' - ,~ ~ ~· . / , · I I L: - , · I , · : · " ~ ,, ' s ' ' ;' ~' '' ' ' ~ ' I ~ ' ! : ' , ' . . t'' : ' : t , ) i ! , il ,~ , . · · "t .... t , : ...... T"'"-'? ............ ,.-L..? . ....... '.... ! .... : , ; . . 4'..,: ...... ; .;I'' ~ ~ , ........... ! I-: ~ .... , . --'. ..... t ........ J l"'~ .... I?'-?'. .... i ....... T .......... t .................. t ..... ' j ' !. '' ,' , ! ....... t .,I t. : [ , , ~ i . ~ , I: ,, :1' ~. ,I ' '~ · '. ; · ' : . . ' · t · · . ' ~ ' . .... I ' , , . . .,. iT;_;...~ .... ,, ......... .,: ....... : .... .,, F.:...,_, ............ : ....... ~ ~..., .... T ....... ,. _.:... s_._: ;_.; ....... ;~ ..... ,.. .... ,_, ...... ,:.:1.,,-~- .... :-,, ; - [.: - ' i.: · 'l · ~ - ! ~ Jl : L, ! : · ; ', · , ; ! ' ' ' , ~ ~ , , , !, ~ , 1 · '~*, J ...... ' .... *~ ' .... --' - J : : r ' t~ f"' ..... ' ........... ''''~ J ! · * 1'" '-- "'"' ..... ..... ' ..... '--- ' · '"' r" ; : ' t .......... f, ~' .... j! ..................... · , t : * . + .... )"~ '" s ' ..... ~ ': · , .. ? ;- ...... ·'ill ........ · ~ ' '':": "}'i ['? ~' ;"'":'-~--1'(': i''*"I']': ~":""~ 1"'r'? "4";'"'"?-'''I"; ..... i-"";-;' 'i" .... · ~ ..... ~ ............. ~ ...... , -' ~... ,, - : ... ;.- , -:.. ;- ~ : '/ ' ' ' ' t ' ' : i t ' I ' , ' : ! ', .... Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. Operator, Well 'Nam~ and Number Reports and Materials to be received by: <~--J~-~ Dat~ Required Date Received Remarks _ , , , Comp letion Report Yes Well History Yes , _Samples Core Chips ~ ~ ~ · Core Description Inclination Su~ey ~0 Drill St~ Test RemUs ~ ~.,. 5r~ Re~rts ~ --~~ A:~l,;O Alaska, Inc. Post Office Box 360 Anchorage/~ .... ~ka 99510 Telephone%~ .77 5637 May 3, 1982 Reference: ARCO DIRECTIONAL SURVEY DATA D.S.15-3 4//2/82 Gyroscopic Job No. A0482G0425 Pl~~ease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 140 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M $0~IO GEOLOGY MARATHON CHEVRON Alaska 0il & Gas Cons. CommiSsion-- Anchorage P'bst Office 9ox 360 "' ' Anchorage,.' ...... ~a $3510 Teleo.honei,',- :7 5637 April 29, 1982 Reference: ARCO CASED HOLE FINALS D.S.14-9B 4/10/82 "'"D.S~2-20 ~ 4/12/82 D.S. 13-1 7 D.S.1!3-17J' 4/13/82 D.S.2-20 z 4/19/82 D.S.7-11~'/ 3/3i/82 DS.~IS-3Zv 4/2/82 D.~1:5-3~ 4/2/82 D.S.7-14~-, 4/1/82 D.S~.14-28''''' 3/28/82 D.S.17-10~ 3/15/82 D.S.14'29~"3/1i/82 D.S.13-23AV/3/17/82 D.S,14-29J3/li/82 D.S.14-29 z 3/11/82 D.S.ll-2J 4/10/82 / D S 2-13~4/19/82 CNL Run 1 2" & 5" ACBL/VDL/GR Run'! 5" ACBL/VDL/GR Run 1 5" CNL Run 1 5" CNL Run 1 5" CNL Run 1 5" ACBL/VDL/GR Run 2 5" CNL Run 1 5" CNL Run 1 5" CNL Run 1 5" Perf Record Run 1 5" Pipe Analysis Log Run 1 5~' CNL Run 2 5" CNL Run 1 5" CBL/VD Tun 1 5" Collar & Perf Log Run 5 5" Collar & Perf Log Run 1* 5" se sign ~ and return the attached copy as receipt of data. Mary Kellis N~r%h Engineering Transmittal # 134 DISTRIBUTION R&D '"~ D&M ~ GEOLOGY MARATHON April 30, 1982 Mr...C.V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commission 3001Rorcupine Drive Anchorage, Alaska 99501 , Subject: State Repocts Dear Mr. Chatterton: Enclosed are Well Completion Reports For the following drill sites: il-6 11-7 14-29 15-2 1A-15 (Revised) Also enclosed are monthly reports for March on these dzill sites: 2-19 15-4 2-20 Eileen #1 13-17 West Sak 24 13-23A 1A-16A (Sidetrack) 14-9B IE-9 14-28 Oliktok Pt. ttl 14-30 West Sak 25 :15 -3 We ave also including plug and abandonment subsequent sundry zepozts on Eileen I~1 and 1A-16. The ceports on Eileen #1, Oliktok Pt. #1, and. the two West Sak Wells are of a confidential nature. We would appreciate it if you could, stove information concerning these wells in a secure area. Sincerely, .. P. A. VanDusen District Drilling Engineer PAV/OG:pb eno. ORU4/B4 MONTHLY REP ~"A~6~ ~A' i~sk a, Inc. -- 11323' FNL, 262' FWL, Sec. 22, ,~,,, "~-'-' - Pru~hoe Bay [!~l~ . ~o ~ Prudhoe Bay u~l voo~~ ~5. E~ew~on ~n ~ees (~nd~cs~e ' Depsh B~ end o~ monSh, foo~ge dt~Ued, fishing lobs, d~tec~on~ dt~ng p?oblems, spud d~se, ?em~tks Drilled 17-1/2" hole to 2678'. Ran and cemented 13-3/8" casing. Drilled 12-1/4" hole to 9310'. Ran and c~ented 9-5/8" casing. Drill 5. Casing or liner run and quant~ ies of cement, results of pressure tests 20", 91.5#/ft, H-40 conductor. Cemented with 400 sx Permafrost II. :.13-3/8", 72.0#/ft, L-80 casing. Cemented with '2500 sx Fondu and 400 sx 9-5 , 47.0#/ft, L-80 and S00-95 casing. Cemented with 700 sx Class G. Permafrost C. 14. Coring resume and brief description N/A. ~th where run 15. Logs run DIL/BHC/GR/SP (ran to 9300'). CNL/GR/Cal. CBL, 8000'-9267' and 6830'-9269'. See Drilling Hi story. J 6. DST data, perforating data, shoWS of H2S, miscellaneous data !N/A. Gas Cons. C0mmJssbt~ ~knowledge. 7. I hereby certify that the foregoing is true and correct to me DesL ~ ~/'~EA/~~' ~ _ .~t be fi,ed in duplicate with the A'a'k' a;~--oont~, regardJess ~~ ~ operations, aha, .... ' TITLE ~EA Z~>Z~ ~~ DATE Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Submit in duplicate Rev. 7-1-80 DS 15-~ Drilling History NU 20" Hydril & diverter. Spudded well ~ 1800 hfs, 03/09/82. Drld 17-1/2" hoie to 2678'. Ran 64 jts 13-3/8" 72#/ft, L-80, BTC csg w/shoe ~ 2673'. Cmtd 13-3/8" csg w/2500 sx Fondu & 400 sx Permafrost C. ND 20" Hydril. Instld 13-3/8" packoff & tstd to 2000 psi - ok. NU BOPE & tstd to 5000 psi - ok Tstd csg to 1500 psi - ok. Drld FC & cml. Tstd csg ~o 1500 psi - ok. Drld FS & 10' new form. Tstd fo~m ~o 12.5 ppg EMW - ok. D~ld 12-1/4" hole to 9134'. Run DIL/BHC/GR/SP & FDC/CNL/GR/Cal. D~ld 12-1/4" hole to 9310'. Ran DIL/BHC/GR/SP to 9300'. Ran FDC/CNL/GR/Cal. Ran 227 its 9-5/8" ~7#/f~, L-80 & S00-95 w/shoe ~ 9302'. Cmtd 9-5/8" csg w/700 sx Ciass G emi. Ins~id 9-5/8" packoff & tstd to 5000 psi - ok. Tstd csg ~o 3000 psi - ok. D~ld FC & cm~ to 9270' PBTD. Arctic packed 9-5/8" x 13-~/8" annulus. Displaced well ~o NaCi. Ran CBL (8000'-9267'), log showed no cml bond at this ~ime. Ran CBL (6830'- 9269'), log showed no cml bond at this time. (Note: D~ld ha~d cm~ below FC 12 hfs af~e~ CIR. Cml samples set up ha~d in 12 hrs. No lost returns o~ indica- tion of problems while cementing ~he casing.) Se~ ~bg hanger & one j~ [bq. Sel BPV, ND BOPE. NU t~ee ~ l~ld ~o 5000 psi - ok. Placed diesel cap ~ ~u~f~ce. Clo~ed SSSV. Inslld l~ee c~p ~ l~td ~o 5000 psi - ok. Secured ~ell & released rig ~ 0800 hrs, 03/2~/82. Note: Well was suspended without completing because of a questionable CBL. 3G:hrl 04113/82 GRU3/A16 APR 3 0 i982 Oil & Gao Cons. CommissWu ARCO Alaska, inc. ' Post Office Box 360 Anchorage. a 99510 Telephone 90/ z77 5637 April 28, 1982 Reference: ARCO ~GNETIC TAPES & LISTINGS D.S.14-29 2/28/82 Tape# ECC 1232 Open Hole -'x 3/18/81 Tape# ECC 884 DDNLL D.S.2-19/~,,/3/24/82 Tape# ECC 1255 CN D.S.7-12 1/11/81 Tape# ECC 878 DDNLL D.S.13-20~2%'17/82 Tape# ECC 1225 CN .,.D,S 15-3 '~/2/82 Tape# ECC 1266 CN D.S 1-17 J 2/26/82 Tape# ECC 876 DDNLL D.S.l-10f~/18/80 Tape# ECC 733 DDNLL D S 14-28 3/28/82 Tape# ECC 1262 CN D.S.7-14----~)'1/82 Tape# ECC 1265 CN D S 12-1 ,~2/23/82 Tape# ECC 1231 CN D S.7-11 3/31/82 Tape# ECC 1264 CN Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 131 DISTRIBUTION NORTH GEOLOGY R&D DRILLING MARATHON CHEVRON MOBTL GETTY D&M GEOLOGY ARCO Alaska, In, Post Offio. .360 Anchorage, Alaska 99510 Telephone 907 277 5637 April 22, 1982 Reference: ARCO MAGNETIC TAPES & LISTINGS D.S.15-3 3/21/82 Tape #62717 D.S.13-17 4/3/82 Tape #62744 D.S.2-19 3/19/82 Tape #62666 ~~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #124 DISTRIBUTION NORTH GEOLOGY ~ R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE~OF?-~:~S~. CHEVRON ARCO Alaska, Inc. is a sul:)sicltary of AllanticRichfielCComp'any 0il & G~,o Cons. comm!ssion · ARCO Alaska, Inc. Post Officr 360 Anchorage, .,ka 99510 Telephone 907 277 5637 April 21, 1982 Reference: ARCO CASED HOLE FINALS D.S. 15-2 w~'' 3/7/82 CBL/VD ~Run 1 D.S.5-17 /' 2/26/82 EPL Run - D, S. 2-19~?-' 3/20/82 ACBL/VDL Run 1 D.S.2-19,.. 3/24/82 CNL Run 1 D.S,15-3 v/ 3/23/82 ACBL/VD Run 1 · .. D.S.16-5~''' 3/22/82 Collar & Perf Log Run 1 DoSo16-12"" 3/20/82 Collar & Perf Log Run - D.S°16-6 ~/ 3/24/82 Collar & Perf Log Run - D.S.16-13 3/18/82 Collar & Perf Log Run - .. D.S.4-14 ~'' 3/27/82 Collar & Perf Log Run 3 D.S.4-14 ~ .... 3/26/82 Fluid Density Log Run 1 Please sign and return the attached copy 'as receipt of data. 5!! 5~ 5~ 5,~ 5~ 5~, 5~ 5" Mary F. Kellis North Engineering Transmittal f/ 117 DISTRIBUTION NORTtt GEOLOGY · R&D DRILLING PHILLIPS SOHIO· MARATHON CHEVRON .:.?.~-:::.':~ .c~e$~e. ],3c. is a subs,~J;a{'¥ ot AtlanhcRichfieidCo;13pany EXXON MOBIL GETTY D&M GEOLOGY STATE OF ALASKA ARCO Alaska, Inc. _ Post ©ffic" "360 March 30, 1982 Reference: ARCO DIRECTIONAL SURVEY DATA D.S.14-29 3/13/82 D.S.13-6 3/2/~.2 D.S.11-7 2/27/82 D.S.16-1 3/6/82 Single-Shot Gyroscopic.~ Gyroscopic Gyroscopic Gyroscopic Job No. 0382-021 Job No. A0382G0416 Job No. A0382G0404 Job No. A0352G0407 Job No. A0382G0408 Multi-Shot I! Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 75 DISTRIBUTION NORTH.GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON ARCO Alas~a. Inc. is a suE,'~,~Ji~r¥ ol AHanl*c~q~chf~e~(tCo;~pany ARCO Alaska, In¥ Post Office'~ .... 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 23, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- DS 15-3 Dear S.ir' Enclosed is a Sundry Notices and Reports on Wells form for DS 15-3. We propose changing the setting depth of the 9-5/8" casing. Your approval of this request would be appreciated. Very truly yours, M. A. Major Area Drilling Engineer MAM' KKL/hrl Enclosure LEN1/B17 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCornpany ECEIVED, A!aska Oil & Gas Cons. Commissioa tmch0rage~ ALASK ,- AND GAS CONSERVATION ~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL COMPLETED WELL [] OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address 0. Box 360, Anchorage, Ak 99510 Location of Well 1323' S & 262' E of NW cr Sec. 22, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 63' RKB I ADL 28306 12. 7. Permit No. 82-30 8. APl Number 5o-029-20722 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 15-3 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [~ Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. ~escribe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, I,n~c., proposes to change to setting depth of the 9-5/8" casing from 8655' (8326' TVD) to"~2~=/~'' TD at 9310' MD (8979' TVD). No 7" liner will be run. NOTE' Verbal approval was received from Bill VanAllen on 03/20/82. MD 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed. ~~ Tit,eArea Drilling Engineer The space below for Commission use Date03/23/82 Conditions of Approval, if any: Approved by COMMISSIONER Approved ?~;; ¥ By Order of the Commission Date Form 10L403 ~ ,Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc( Post Officel~ .360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 18, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- DS 15-3 Dear Sir' Enclosed is a Sundry Notices and Reports on Wells form for DS 15-3. We propose changing the setting depth of the 9-5/8" casing and the running depth of the 7" liner. Your approval of this request would be appreciated. Very truly yours, M. A. Major Area Drilling Engineer MAM: KKL/hrl Enclosure LEN1/B17 RECEIVED MAR 1 81982 Alaska 0ii & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ,,' - STATE OF ALASKA Ct ALASKA~~ L AND GAS CONSERVATION .dMISSION " SUNDRY NOTICES AND REPORTS ON WELLS !. DRILLING WELL COMPLETED WELL OTHER [] 2. ~,:ame ~ Op_~--ato~ 7. Permit No. ARCO Alaska, Inc. 82-30 3. Adci-ess 8. APl Number ?. O. Box 360, Anchorage, Ak 99510 50-029-20722 4. [_oc~-t_ion of WeJI _ 1323' S & 262' E of NW cr Sec. 5. Ele~_tkm in fr:~=t (indicate KB, DF, etc.) 63' RK8 22, T11N, R14E, UM I 6 . Lease Designation and Serial No. ADL 28306 9. Unit or Lease Name Prudh0e Bay Unit 10. Well Number DS 15-3 11. Field and Pool Prudhoe BaY Fi'eld Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Per~orame El Alter Casing [~ Perforations [] Altering Casing [] Stimu ~--~e [] Abandon [] Stimulation El Abandonment [] F~eFeir ~'¥ell [] Change Plans [] Repairs Made [] Other [] Pu~! T~[~ing_ [] Other [] Pulling Tubing [] (No.~e: Fi .e~Dr~ m~ltiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) i3. D~r~e ~roc)osed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any prccc~;d ~,~or!'~, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to change to setting depth of the 9-5/8" casing from 8655' MD (8325' TVD) to 9132' MD (8803'TVD). A 7" liner will be run from 8832' MD (8503' TVD).to TD at 9.t49' MD (9020' TVD). SuBsequent Work Reported on Form No.. - Dated RECEIVED MAR 1 8 1982 AlasY~ 0il & Gas Cons. Commission' An~h0rage 14. ! he~-Sy ce~ify that the foregoing is true and correct to the best ~)f my knowledge. s~.~-~ ~~~"~ TmeAYea Drilling Engineer The ~.-'.e be'lc~v for Commission use Date 03/17/82 ApproVed .?.opy Returned By Or-~er of COMMISSIONEF1 the Commission Date Form Rev. 7-1~ Submit "Intentions" in Triplicate. and "Subsequent Reports" in Duplicate~. . /,,o~ .. EILOWOUT PREVENTE. R.. TEST TEST ,,mmgJm, March 5, 1982 Mr. ~/ark Lajor Area Dril ling Engineer ARCO Alaska, Inc. P. O. Box 360 Anchors/e, Alaska 99510 Rez Prudhoe Bay Unit DS 15-3 ARCO Alaska, Inc. -Permit No. 82-30 Sur. Loc. 132~'S, ~6~'E of NW or Sec 22, TllN, R14E, U~. Bottomhole Loc{ 1~26~S, 1~92'g of NE er Sec 21, TllN, RI4~, U~. Dear Mr. M~a J or: Enclosed is the approved application for permit to drill the above referenced wel I. ~/ell samples and a mud Icg are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipmeter surveys. Many rivers in Alaska. and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these 'areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title. 5, Alaska Administrative Code). Prior to commencing ope, rations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article ? and the regulations promulgated 'thereunder (Title 18, Alaska Administrative Code, Chapter ?0)-and by the Federal Water Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. ?rudhoe Bay Unit I)S 15-3 -2- 1982 T° aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. ~/e would also like to be notified so that a' representative of the Commission may be present to witness testin~ of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please t~tve this office adequate advance notification so that we may have' a witness present. Very truly Y°urs, C. V. Chatte~to~y Chairman of ORDER OF THE COMM~SS;ON Alaska Oil and Gas Conservation Co~uission Enclosure Department of Fish ~ Game, Habitat Section ~/o encl. Department of Envirom~ntal Conservation w/o encl. CVC;be ARCO Alaska, Inc. Post Office B~f'~''' 60 Anchorage, Ai'aska 99510 Telephone 907 277 5637 ,. d'.O. /'75 March 5, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99510 _ -- _ ~6~'~ject' DS 15-3,~.Open Hole Completion Dear Sir: ARCO Alaska, Inc. requests the Alaska Oil and Gas Conservation Commission to grant an exception'to Rule 3(f) of Conservation Order No. 145 in order to complete subject well as an open hole completion. Below the 9-5/8" shoe the hole will be under reamed to an approxi- mate total depth of 9349'MD (9020'TVD) and left open to evaluate new completion techniques in the Sadlerochit formation. Any ques- tions pertaining to this work should be directed to Ms. Karla Lenz at 263-4966. Very truly yours, -~:~ , j ..--} .-;.. ,....-, : /"~,;.~. , :~.. .//...,?::3 "'- - M. A. Major Area Drilling Engineer MAM'GA'ltc ARCO Alaska, Inc. Post Office L_., 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 5, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil & Gas Conservation Commi ssion 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-3 Permit to Drill Dear Sir: Enclosed is our resubmission for Permit to Drill DS 15-3. Attachments to~n include a plat detailing the section and plan views of the proposed wellbore, a proximity plat showing the subject wellbore's position to the nearest well drilled, and a sketch and description of the BOP equipment and testing procedure, including anticipated pressures. As we anticipate spudding this well on or around March 8, 1982,~ your prompt review of this application would be appreciated. Very truly yours, P. A. Van Dusen District Drilling Engineer North Slope District PAV:KKL/hrl · Attachments LEN1/B11 ~RCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, In . ~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 February 26, 1982 Mr. C. V. Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 15-3 Permit To Drill. Dear Sir' Enclosed please find our application for Permit to Drill DS 15-3 and the required $100 filing fee. Attachments to the application include a plat detailing the section and plan views of the pro- posed wellbore, a proximity plat showing the subject wellbore ' s position to the nearest well drilled, and a sketch and description of the BOP equipment and testing procedure, including anticipated pressures. As we anticipate spudding this well on or around March 5, 1982, your prompt review of this application would be greatly appreciated. Very truly yours, P. A. VanDusen District Drilling Engineer PAV:ss PAV/JBK/ss Enclosures RECEIVEO MAR 0 1 1982 Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASK~ )ILAND GAS CONSERVATION i~ MMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL J~[ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC SINGLE ZONE [~ MULTIPLE ZONE 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 360, Anchorage, Alaska 99510 /I,,tA~ . 4. Location of well at surface '"flit U ~ 1982 1323' S A 262' E of NW cr Sec. 22, T11N,AI~IaI~Fo~i~Oon.~ At t~ of propm~ producing inte~al Co~ . 1325' S & 1115' W of "W cr Sec. 21, T11N, At total 1326' S & 1392' W of NE cr Sec. 21~ T11N~ R14E, UM 5. El~ation in f~t (indicate KB, DF etc.) ~ 6. Lease designation and serial no. 63' RKB ~ 28306 12. Bond infomation (see 20 AAC 25.O25) Federai; insurance- Co. Type Statewide Su~,w~nd/or,,~ber 8088-26-27 :: 13. Distance and dir~tion from nearest town ~ 14. Distance to n~rest property or lease line Approx. 6 mi. NW of DeadeyeJ ' 3888" 16. Propo~ d~ (MD & TVD) 17. Number of ~rm in lease 9020' TVD 9349' MD ~ee~ ' 2480 19. If deviat~ (~ 20 AAC 25,050) J 20. Anticipated pressures KICK OFF POINT 3600 feet. MAXIMUM'HOLEANGLE 28°~ {see 20 AAC 25,035 (c) (2) 9. Unit or lease name Prudhoe Bay 10. Well number '~z0~5-3 I1. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool Amount $500,000 75. Distance to nearest drilling or commpleted well 1000' feet 1~3. Approximate spud date Harch 8, 1982 3320 psi~ ,,. Surface 4054 . psig@_9_020_~. TO ITVm 21 ,'Proposed Casing, Liner and Cementing Program SETTING DEPTH! QUANTITY OF CEMENT SIZE Hole I Casing 30'" 120" 17½" J13-3/8' !2¼" .,] 9-5/8' Weight 94#' 72# 47# 29# CASING AND LINER Grade Coupling H-40 Weldedl N-80 BUtt. L80 & IButt'" S00-95 L-BO IBut't 22. Describe proposed program: 'Length M D TOP TV D 2700' 110' 0 i 0 I 8655' 994' 0 0 I 8355' I 8026' I MD BOTTOM TVD ll0i! 110' 2700'i 2700' 8655'~ 8326' 9349'[ 9020' (include stage data} 300' sx Permafrost 2300 sx Fondu:, 400 sx Class G 500sx,. 1st st~ 300sx, 2nd stg "300 Sx class G ARCO Alaska, Inc. proposes to' directionally drill this well t© 9349' MD (9020' TVD):to produce the'Sadlerochit zone. Logs will be run across selected intervals. A 13-3/8'I 5000 psi RSRRA BOP stack will be used. The'BOP equipment will be pressure tested eaCh week and operationally tested-each trip. A string of 5½", Il#, L-80 tubing, packer, and necessary provisions for-subsurface safety equipment will be run. A non-freezing. fluid 'will be, left in all. uncemented annuli within the permafrost interval. A surface diverter system will be installed and operationally tested prior to spud and at least daily thereafter, This well will be S-shaped. 23. I hereby.certify that the foregoing is true and correct to the best of my knowledge SIGNED ~~ ~ TITLE Area Dril 1 in~ En.qineer DATE 03/05/82 The space below for Commission use Samples required []YES ~0 Permit number R2-30 ' APPROVED BY Form 10-401 Rev. 7-1-80 Mud log re~: []YES Approval date CONDITIONS OF APPROVAL Directional Survey required APl number ~Y, ES []NO 50029_20722 SEE COVER LETTER FOR OTHER REQUIREMENTS __ ,COMMISSIONER DATE~a..~t_ ~ ~ ~oo by order of the Commission '.;? .- Subrni% in tr, iplicmtm 13-5/8" BOP STACK DIAGRAM Accumulator Capacity Test ! ANNULAR PREVENTER BLIND RAMS 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultane- ously and record the time and pressure remaining after all units are closed with charging pump. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test PIPE RAMS DRILLING SPOOL PIPE RAMS 1. Fill BOP stack and manifold with a non-freezing liquid. 2. Check that al-i~ hold down screws are fully retracted. Mark running joint with predeter- mined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and chokes and bypass valves on manifold. 4. In each of the following tests, first hold a 250 psi low pressure test for a minimum of ,3 minutes, then test at the high pressure. 5. Increase presure to 3000 psi and hold for a minimum of 3 minutes. Bleed pressure to zero. 6. Open annular preventer and close top set of pipe rams..~ Increase pressure to 5000 psi and hold for at least 3 minutes. Bleed pres- sure to zero. 7. Close valves directly upstream of chokes and open chokes. Increase pressure to 5000 psi & hold for at least 3 minutes. Bleed pressure to zero. 8. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 3 minutes. 9. Test remaining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. 10. Bleed pressure to zero. Open bottom set of pipe rams. 11. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minutes. 12. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are full of non-freezing liquid and all valves are set in drilling position. 13. Test standpipe valves to 5000 psi. ~[~)V~j~.14. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 15. Check operation of Degasser. 0 5 i9 2 16. Record test information on blowout pre~enter test form. Sign and send to Drilling Super- Alaska Oi~ & Gas Cons. COll~llliS~iONisor. A~tcho[ag~ 17. Perform complete BOPE test once a week and functionally operate BOPE daily. Rev. 3/12/81 SURFACE HOLE D IVERTER SYSTEM SCHEMATIC ARCO ALASKA INC'. IO" HYD. OPR. BALL VALVE WE,L,L BORE (SEE DETAIL) I0 HYD. OPR. BALL VALVE I ALL 90° TURNS ARE "TEE" CUSHION I I~LL ( ~ BORE I RESERVE PIT AREA FLOWLINE F DR ILL lNG RISER L 20" 2000 PSI WP ANNULAR PREVENTOR I I I L~lo,, HYDRA~)O  OPERATED BALL VALVES 20" C(:~DUCTOR PIPE "DETA IL" 2026010203 CHECK LIST FOR NEW WELL PERMITS ITeM APPROVE DATE --(9 'thru ~1'2 thru 20) (5) BOPE ~_j~ ~'~21 ~ thru 24) ® Company /~LO~~ Is the permit fee attached .......................................... ~ 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................. 4. Is well located proper distance from other wells ................... 5. Is sufficient .undedicated acreage available in this pool ............ 6. Is well to be deviated and is well bore plat included .............. 7. Is operator the only affected party ................................. 8. Can permit be approved before ten-day wait ......................... 9. Does operator have a bond in force .................................. 10 Is conservation order needed · a i I e e i e e e · e e · i · i ® e · · ® I · · ~ · · · · · · · · · · · · · · 'al need d 11. Is administrative approv e ................................... i2. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. ,24. 25. Is conductor string provided ...... Is enough cement used to ci~cu{a;~'~'~~'~n~'su;~a~'[[i~[['' Will cement tie in surface and intermediate or production strings · Will cement cover all known productive horizons ............. Will surface casing protect fresh water zones ..... ~,~1 ....... 1.1 Will all casing give adequate safety in collapSe, tension and burst Is this well to be kicked off from an existing wellbore ........... Is old wellbore abandonment procedure included on 10-403 ...... ~... Is adequate well bore separation proposed ......................... Is a diverter system required ......... Are necessary diagrams of diverter ~'BO~'~q~ip~['2;[~g~'iiii'' Does BOPE have sufficient pressure rating -Test to ~--~O 'p~'[ Does the choke manifold comply w/AP1 RP'53 (Feb.78) .................. Additional requirements ' el·eel e e.ee Ieee e i e eeeeeeee eeeeeeeeeee eee eee ee · Additional Remarks: Geology: Engin~, ij~g: ~ LCS ,~ BEW ~ WVA~ [~) JAL ~ JK~~~ MT~ ~// rev: 01/13/82 " INITIAL ' GEO. UNIT ON/O'FF, POOL CLASS STATUS AREA NO. SHORE . CHECK LIST EOR NEW WELL PERMITS Company Lease & Well No. ITeM APPROVE DATE (1) Fee (2) Loc thru 8) (3) Admin (~/thru (4) Casg ___~~- 7.-z-~~/ ~I'2 -thru 20) (5) 1. Is the permit fee attached ........................... 2. Is well to be located in a defined pool ............ iii"' 3. Is well located proper distance' from property l~ne ii · 4. Is well located proper distance from other wells .. . 5. Is 'sufficient undedicated acreage available in this pool 6. Is well to be deviated and is well bore plat included .. 7. Is operator the only affected party ..................... 8. Can permit be approved before ten-day wait .............. o 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. · · · eoooeoeeo eooeoeeeo Is enough cement used to circulate on conductor and surface...... Will cement tie in surface and intermediate or production strings Will cement cover all known productive horizons ............ ... Will surface casing protect fresh water zones ..... ''..' Will all ~casing give adequate safety in collapse, tension and burs Is this well to be kicked off from an existing wellbore .......... YES NO REMARKS Does operator have a bond in force ................ ~.. Is a conservation order needed ..... Is administrative approval needed ................................... Is conductor string provided ....................................... to Is old wellbore abandonment procedure included on 10-~03 ............ , ~'t, Is a d~verter syst~ required Are necessary d~agrams of d~verter and BOP equipment attached ' Does ~PE have sufficient pressure rating- Test to 7OoO 'ps~g Does the choke man~old cmply w/~I ~-53 (Feb.78) .................. (6) ~dd:~ 7-2-~-~'/ 25'. Additional requirements . Additional Remarks: Lr~t~ttW,~P.%*~bL~ Geology: Engineering HWK ~-~ LCS BEW~ WVA~~ JKT~~__~AD rev: 01/13/82 INITIAL GEO. UNIT ON/~FF POOL CLASS sTATus AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particUlarly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, informati°n of this nature is accumulated at the end of the file under APPENDIXi .. No 'special'effort has been made to chronologically organize this category of information. ,o WELL:NAM~ FIELD, NA~E : PRUDHOE, BAY BOROUGH : NORTH SLOPE STATE : R~SKA AP! NUMBER ~rzRENC£ NO : g~34~ RECEIVED OCT 1 5 199~ Almsl~ 011 & Gas Cons. Commi~sion Anchorage Sch!Um/',erg,re Alaska Computino Center SERVICE NAME g EDIT DATE ~ 92/09/12 ORIGIN I rbI¢ REEL NAME . I 92345 CONTINUATION # t PREVIOUS REEL ) COMMENT ~ ARC0 ASASKA !Nc,PRuDHOE BAY ,05',t3,500292072200 **** TAPE HEADER DATE ~ 92/09/12 Pb ORZGZN I 92t45 TAPE NAME g CONTINUATION # I PREVIOUS TAPE COMMENT ~ ARCO ALASKA INC,PRUDHOE BAY,O5-13.,500292072200 TAPE HEADER P~UDHOE;:BAY UNIT CASED HOLE WIREL!NE LOGS WEyL NANEI.. AP NUMBER'I OPERATORI .... LOGGING-CONPANYg TRP~ CREATION DATEI dOB NUMBERI LOGGING ENGINEERI OPERATOR WITNESS~ SURFACE LOCATION TOWNSHIP! PEL-I EbEVATION(FT FROM MSb O) KELLY BUSHIN~g D~RRICK GROUND LEVELI WEbbACASlNG RECORD SURrCE LOCATION iST STRING 2ND STRING 3RD STRING PRODUCTION STRIN~ 500292072200 ARCO ALASKA iNC SCHLU~BE~GE.R WEbb SERVICEs I2-$EP-9~~ 92345 FORMICA SCALES 22 lin 3 00 O0 OpEN HOLE CASIN~ BIT SIZE' (IN) SIZE IN) t2,~50 9,625. DRILLERS DEPTM(FT) 9302,0 CASING WEIGHT (LB/PT) 47,00 PAGE: SchIumberoer Alaske ¢ompu~!nq Center CURVE~SHIFT D~TA -: ALL>PA$~E$ TO ST~ND~RD¢~E~URED DEPTH) · ~ASELINE.~CURVE· FOR SHIFTS PBU CURVE CODE:· GR RUN N!JMBERI~ PASS NU~BERI LOGG~g~ ¢OMPANY~ BASEL::['~E:D~pTH 96688 O 9256 9247 9246 9244 9228 9227 9219 ..~07 9200 9199 9i76 9~42, 900~, 900i. 8990 8984 8864 8840 8839 8759 8758 8720 8701 869~ 8675 8654 8653  612 610 8570, 8546, lO0, Rg~ARK8 1 5 5' 5 0 5 5 0 5' 0 0 0 0 0 5 5 0 0 5 0 0 5 0 0 0 0 5 0 5 5 0 88889,0 92 48,0 9 9211o~ 9207,5 9200,5 9!77 :0 8984,0 8840,0 8759,0 8?20.5 867B,0 8654,5 $616,0 86!2,5 8547,0 100,5 86887,5 9256'0 9248 9228,0 9211,0 9 oo' 9003,0 8991,0 eees':o 8840,0 8701:,5 8697,!0 8654,5 8612,5 ! 00'5 THE OPEN HOb~ {NFORMAT!O~ SUCH AS. LOG. C~N~.~P~P-iY,, .RUN NUMBER: AND PASS NUmBeR. WAS NOT P~OvzDED W'~.~ T_E''~APE SUPPLZED BY TXE~ CLZENT,: PAGEI ~aPe~!,.ve~.fJcat~on ~st~ng 12-SEP-~99~ ~0~o2 $chlumberqer Alaska Computing center ~00~E~ HOLE ~'A~O'¢AS~ HOL~ ~pH! TO OPEN ?HE;MAIN PASS" OF THE CNT~ ~A$ USED AS PASS' I AND THE SECOND PASS AS PASS 2", SINCE THE INTERVALS hOGGED WERE SUBSTANTIALLY DIFFERENT NO AVERAGE WAS PERFORMED - AS PER::$U~ WINFIELD, FIELD ENGINEER'S REMARKS~ TIED' INTO SW$~BHCS 20'MAR-82, NEUTRON MATRIX{ SAND. HOL~ CORRECTIONt BIT SIZE, S $ .****. FILE HE~DER· **** F~LE: NAME ~ EDIT ,00! SHiV!CE ~ FL!C . VERSION D~TE' { 92/09/12 M~x R~c, sIz~ =.~o2~ F~LE TYPE ~ ~0 FYLE HEADER FYLE NUMBER{ EDITED CURVES Depth shifted and clipped curves for each pass tn separate illes. DEPTH INCREMENT 0.5000 FIL~ SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRC~ 9255.0 8550,0 CNTH 9261.0 8550.0 ~URvE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) PBU RVE CODEr pASS ~UMBERt ~ --'---'---EOUIVA~ENT UNSHIFTED DEPTH'--''''''' ~ASELINE DEPTH REMARKS{ THIS FILE CONTAINS THE FIRST PASS OF THE CNTH, NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA, $ L{SFORMAT DA~A ,, LIS TaPe Yert~icat. ion [~:tst~nc3 Schlumbetqer Alaska Computlng Center PAGEI FOR.AT 'SPECIF'ICAT~.O. RECORD SET TYPE -~ 64EB,**, TYPE: REP~.CODE~ : VALUE 0 2 3 73 5. 66 6 73 7 65 9 65 65 66 0 66 28 1 F~.. 36 0 68 1 0 ** SET TYPE - CHAN ** NAM~ SERV UNiT SERVICE AP! API API AP! FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CLASS ~OD NUMB SAMP ELEM CODE (HEX) ~p~ r~ ~os~ oo ooo oo o ~ , , 4 s, oooooo~o~o "P"!CN?" PU'8440525 O0 000 O0 0 ! 1 ! 4 68 0000000000 ~.~TC.T. 4sos~ oo ooo oo o ~ ~ t 4 s~ oooooooooo NT~ CNTH CPS 44052g O0 000 O0 0 I I ! 4 6g 0000000000 ~. oo ooo oo ~ ~ , ~ ~ s, ooooo~ooo CFTCCNTH CPS 4~28~ ~.c.c.T. ~.z4 oo ooooo ~ ~ ~ . 4 e~ ooooo~ooo TENS ¢ST~ hB 44052g O0 000 O0 0 ! ~ I 4 6g .0000000000 ** DATA ** D£PT 9000:gO0 NPHI;CNTH ~6 77! CRAT'CNTH 3o]7~ CNTC.CNTH CFTC~CNTH 372~ .56._ GRCH'CNTH 14~122 TENS,C~TH 2531,660 D~P~' 8 '000 NP"ISCNTH 5t."49 CEAT,CNTH 4 247 CNTC.CNTH ~FTC'CNT" '~,7,46 GRCH;CNT" 54'594 TFN~,CNTff 2~78:000 t235.330 1264,281 ** END OF DATA ** Schlumberqer~ Alasl~a Comput ng center FILE NAMg ' I'£DI? ,001 VERSION I O0~.AO? DATE I 92/09/12 MAX REC 8IZ~ I 1024 FTLE TYPE ~ LO LAST FZLE S~RVlCE ~ ~bIc. V~RSION z O01AO? DATE' ~ 92/09/12 ~kX REC~ SIZE ~ !024 FILE TYPE I LO L~$T FiLE { F~LE HEADER FILE NUMBER, 2 EDITED CURV~ Depth sh ted and clipped curves ~or each pass ~n separate ~lles, P~$S NU~BER~ 2 DEPT~ INCREMENT 0.5000 Flb~ SUN~ARY PBU TOOL CODE START DEPTH $~OP DEPTH ~RCH''"''"'''"''' '"'"'''''''9255,0 '"''~''''899' 0 CNTH 9261.0 8997,0 ~u~v£ SHZF? D~?A - PASS TO BAS£bZNE.¢URVE: FO~,R SHiFT~RcH peu cuRv~ coot. pass .u.s~ ----------EQUIVALENT UNSHIFTED DEPTH"-"''-'''' BASELINE DEPTH GRCH 262,0 ~248,5 9248.5 9~2~,5 9227.5 922 .5 9210 5 9211,0 9202i0 0202.0 9~94 0 9194.0 9190 0 91 CNTH 88888,5 9262.5 9226,5 9!90,0 9!.61,5 I~IS ?a~e verification b~stina Schlumberger A[a$~re. ¢omputtnO Center 9160.5 9160,0 9160.0 9147.0 914~,0 9142.0 9t36 9136,S 9107'0  098.0 063.5 9os9'o 9058.5' 904'7;5 9021,0 9021.5 9009,5 9002,5 9002.S iO0,O 100'0 9159,0 9!48,0 9!37,5 9107'0 9097 ' 9048'5 9009'5 !00'0 ABOVE REFLECT: PASS~ 2' ~RCH TO PiSS'l GECH AND PASS TO ~ss i ~HI. SET.TYPE - 64EB ** TYPE REPRo. CODE VALUE 0 ! o+s F' S6 0 FT 68 1 ! 66 2 66 3. 73 4 66 5. 66 6 73 ? 65 B 68 9 65 i! 66 !4 65 !5 66 16 66 · 0, 66 ~X$ ?aee, veriA~icat~on ~stin~ S~hlumberger iaska Computlnq center 12-8EP-1992 !0:02 PAGE: D~PT FT 4405~R NPH! CNTH PU-S 440528 CRAT CNTH 440528 GRCH CNTH GAPI 440528 CNTC CNTH CP& 440528 CFTC CNTH CPS 440528 TENS CNTH LB 440528 ** SET 'TYPE - CHAN ** NAME SERV UNIT SERVICE AP! API API. API F!L~ NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) O0 000 O0 0 2' ! I 4 68 0000000000 O0 000 O0 0 2 I ~ 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 I I 4 68 0000000000 O0 000 O0 0 2 1 I 4 68 0000000000 O0 000 O0 0 2 ! 1 4 68 0000000000 O0 000 O0 0 2 1 I 4 68 0000000000 ~m~m~mmm~m~#~m~mmm~m~m~~m~N~m#mmmm~m~#~m~mmmm~mm~m~mm~mmmmmm~m~mm CNTC'CNTH 125~.'.~805 DEPT.. 8997,000 CNTc'CNTH 1-453,63i END OF DATA NPHI~CNTH 40,it12 CRAT-CNTH 3.6 8 CNT CFTC;CNTH 364,~4! TENS,CNTM 2660,1~2 GRCH. H NpHI'CNTH 24.793 CRAT,CNTH .2.825 GRCH.CNTH CFTC"CNTH 528.010 TENS,CNTH 2569°660 -999,250 16.726 rIb~ NAME {-EDIT ,002 SgRVI~E : FLIC V~R$ION { 001A07 D~TE : 92/09/22 ~AX REC SIZE ~ !024 rIb~ TYPE : LO LRST FILE~' ~ F!SE NA~E~ SERVICE : rbIC VERSION , O~AO? DAT~ ~ 9 09/12 ~AX REC' SlZ~ I 1024 FILE TYPE : LO LAST FILE R~W. CURVES Curves' and~ log header PASS NUMBER: 1 data for:.eaeh pass in separate files; raw background PaSS in last ~ile LIS TaPe Verification L~stin Schlumberger Alaska Compu~n~ Center 12-~EP-1992 ~0:02 PAGEI D~PTH INCREMENTI F)bE SUMMARY VENDOR TOOL CODE CNTH LOG HEADER DATA -.§000 5TART DEPTH 9275.0 DATE LOGGED: SOFTWARE VER$~ONI TIME LOGGER ON BOTTOM~ TD DRILLER ('FT)I · D LOGGERCFT)~ ~OP LOG INTERVAL (FT)~ BOTTOM LOG INTERVAL (FT)~ ~OGG~NG SPEED (FPHR)~ D~PTH CONTROL USED CYES/NO)~ STOP DEPTH ';;X;"'".o 31-MAY-9 CP 32.6 400 926~.0 9265'0 9550.0 9263.0 1800,0 NO Tool STRING.. (TOp TO BOTTO~)p VENDOR TOOL CODE TOOL~, Y E TOOL NUMBER CNTH T£b~M£TRY CARTRIDGE TCC-B 421 CNTH CO~LAR LOCATOR CAL-YA 229 CNTH G~MMA ~AY SGC'SA CNTN COMPENSATED NEUTRON CNC-HD 2!90 CNTH COMPENSATED NEUTRON CNB-A~ 3237 ~OREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN), DRILLERS CASING DEPTH ~OGG~RS CASING D~PTH (FT) BOREHObE CONDITIONS FLUID TYPE~ FLUID DENSITY SORFACE TEMPERATUR (DEGF) BOTTO~ HOL~ TEMPERATURE (DiGF)I FLUZD-.SALZNITY FbUID LEVEL (FT)~ F~OXD RA~E ~T WEbt.,H~D WAT£R CUTS CHOKE (D~G)~ N UTRDN TOOL- TOOL TYPE (EP~THERMA~ OR THERMAL)~ ~ATRIX: MATRIX DENS~TY~ HOLE CORRECTION (IN)~ 8~UELINE COUNT RATE NORMALIZATION IN OIL TOP NO~PAL~Z~NG WINDOW (FT)~. BASE NORMALIZING WINDOW 31-MAY-92 12'250 9302,0 SEAWATER 8,50 16B.0 SANDSTONE ZONg $~hlUmberoer AlasKa Computlno Center t2-SEP-!992 10102 PAGEl BLUELINE COUNT RATE'SCALES SET By FIELD FAR COUNT RAT£ LOW $CALE~-(CPS) FAR COUNT RATE. HIGH SCALE (CPS) NEAR COUNT RATE LO~ 'SCALE (CPS)= N~AR COUNT RATE HIGH SCALE (CPS){ TOOL sTANDOFF (IN){ TRON ~AT~X - ~A D HOLE CORRECTION = BIT SIZE, S 6000' 0 21000 ** SET TYPE - 64EB ** , TYPE REPR.C~D~., VALUE i 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 11 66 t6 68 1~ 66 i 0 14 65 FT 15 66 68 i6 66 1 0 66 I ** SET TYPE - CHAN ** NAMF SERV UNIT SE'RVICE API AP! APl APl FILE NUMB NUmB SIZE REPR PROCESS ID- ORDER # bOG TYPE CLASS MOD NUHB SAMP ELEH CODE (HEX) DFPT FT 440528 O0 000 O0 0 3 1 ! 4 68 0000000000 NPH! PS1 PU 440528 O0 000 O0 0 3 I 1 4 68 0000000000 TN~A PS1 440528 O0 000 O0 0 3 I I 4 68 0000000000 CNTC PSi CPS 440528 O0 000 O0 0 3 t I 4 68 0000000000 CFTC PSi CPS 440528 O0 000 O0 0 3 I 1 4 68 0000000000 GR P81 OAPI 440528 O0 000 O0 0 3 1 1 4 68 0000000000 TENS PSi LB 440528 O0 000 O0 0 3 I I 4 68 0000000000 ~$ ?sPe..veriflc~tion ~iStinq Schiu~bercjer ~a.s~<a ¢o~putinq Center ~2-SEP'1992 10i02 PAGEI 75.o.oo PH iLps po r?'c.pst 371'269 a~'ps!~ 40;4 52 TENS*PSITN~A'~81' 1929.924 3.601 CNTC.PSI : CFTC.PSI 333,791 gR.Pgl 14.!22 TENS..PS~: 2539:__4 EPT':, · 8545.000 NPHI'P$ 51. TNRA I 66 CNTC . TE~S'PSI 1313.543 1236.025 1097.480 ** END 0r DATA ** l0 S~RVICE ~ FLIC VERSZON I 00!A07 DATE I 92/09/12 MAX, REC~ SIZE I I024 FILE TYPE~ ~ LO LASTFILE: I **** rlb~ READER FILF NANE ~ EDZT .004 SERVICE ~ FLOC VERSION I O0!AO? DATE { 92/09/12 MAX'"RECi. SIZE ~ 10.2.4 FILE TYPE. ~'LO LAST FILE CURVES CUrveS~and P~SS: NUMBER~ ILE SUMMARY VENDOR:TOOL . CNTH lOg' header data 2 -. 5 00 0 START DEPTH 9276.0 for each pass in separate STOP DEPTH .-.-...... 8995.0 raw bac~qround Pass in last file Schlumberger Alaska ComPuting Center . 12'SEP-1992 10:02 PAGE: 11 SOFTWARE VERSION, TI.E LOGGER ON BOTTOM{ TO DRILLER eFT), TD LOGGE.(FT),' TOP LOG ~INTERWAL IT BOTTOM bOG INTERV~. I~T): LOGGING-SPEED (FPHRIt . DEPTH CONTROL USeD YES/NO), TOOL STRING (TOP TO BOTTON) VENDOR TOOL CODE TOOL TYPE CNTN TELEMETRY CARTRIDGE CNT~ COLLAR LOCATOR CNTH GAMMA RAY CNTH COMPENSATED NEUTRON CNTH COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE¢ · EP~H (FT): LOGGERS CASING DEPTH BOREHOLE CONDITIONS FLUID TYPE: FLUXD..DENSITY (~B/G)~ SURFACE TEMPERATURE DEGF)= BOTTOM HOLE TEMPERATURE (DEGF){ FLUID SALINITY FLUID LEVEL (FT){ F~UXD RATE AT WELLHEAD WATER CUTS (PCT){ GAS/GIb RATIO= CHOKE NEUTRON TOOL TOOL TYPE (EPITNERMA5 OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUEL1NE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW BbUELINE COUNT RATE $CA~ES SET BY FIELD ENGIN£f~ FAR COUP? RATE {CPS rA~ COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS) : NEAR COUNT RATE NIGH SCALE (CPS): 31'MAY~9 CP 32.6 400 9264.0 926 '0 [o TOOL NUMBER TCC- 421 CAL-YA 2~9 iGC-SA 271 CNC-HD 2190 CNB-AB 3237 31-MAY-92 302,0 SEAWATER 8,50 168.0 SANDSTONE 2.65 0 6000 0 21000 TOOL STANDOFF (IN): NEUTRON NATRIX SAND HOLE'CORRECTiON = B~T SIZE, to O2 PAGEI 1.2 8ET.TYPE'-.64EB-** TYPE REPR CODE VA~UE ! 66 0 :2 66 0 3 73 28 4 66 1 5 66 6 73 ? 65 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE APl API APl APl FIbE NUMB NUMB SIZE REPR IPROCESS ID ORDER # bOG TYPE CLASS MOD NUmB SAMP ELEM CODE (HEX) DEPT FT 440528 O0 000 O0 0 4 I I 4 68 0000000000 NPH! PS2 PU 440528 00 000 O0 0 4 I I 4 68 0000000000 TNRA PS2 440528 O0 000 O0 0 4 I I 4 68 0000000000 CNTC PS2 CPS 440528 O0 000 O0 0 4 I I 4 68 0000000000 CFTC PS2 CPS 440528 O0 000 O0 0 4 I I 4 68 0000000000 GR PS2 GAP! 440528 O0 000 00 0 4 I i 4 68 0000000000 T~NS PS2 LB 440528 00 000 00 0 4 I I 4 68 .0000000000 CNTC.PS2 1442.449 Schlumberoer: las!ca ComputlnO Center' !2..SEP-1992 !0:02 PAGE: 13 DEP. TI*.. [~995.,000 NPHt,,PS~ CFTC, p$2 5 3 3,093 GR, PS 23.397 TNRA.PS2 291776 TENS,PS2 2,762 CNTC.PS2 2565.688 1463,629 END OF DATA **** FILE TRAILER. *~'** FIS~ NAME : EDIT .004 SERVICE ~ FblC VERSION g O01AO? D~T~ : 92/09/12 ~AX R£C'$IZ; ; ~024 F~LE TYPE : LO LAST F~LE ~ ***.* TAPE TRAILER ****. SBRVICE NAME :EDIT DATE : 9 O~IGiN TAP~ NAME ~ : 92345 CONTINUATION # g 1 PRE~OU8 TAPE COMMENT : ARCO ALASKA INC,PRUDHOE BAY~05-!3,500292072200 ER * ** O~I~IN : FLIC REE~ NAME : 92345 CONTINUATIO~ # : PREVIOUS REEL COMMENT ) ARCO ALASKA INC,PRUDHOE BAY,OS-!)'500~9207~200 #----SCHLUMBERGER .... VERIFICATION ~ISTING LVP 009,H03 VERIFICATION L1STIN2i PAGE 1 #* REEL HEADER #~ DATE :82/04/15 ORIGIN : REEL NAME =REEL ID C3NTI~UATION # :01 PREVIOUS RfEI .' COMMENTS ~RgEL COMMENT5 ,# TAPE HEADER ~E NAMEi SERVI~ SERVI DATE 182/04/15 ORIGIN =, TAPE NAME C3NTI~UATION # 501 PREVIOUS TAPE COMMENTS :T%PE: COMMENTS #~ FILE HEADER ## FILE NAME =$gRVlG,O¢l SERVI2E NAM£1 : VERSION # : DATE : MAXIMUM LENGTH : 1024 FILE TYPE : PREVIOUS FILE ~ ,# INFORM,~ION RECORDS MNEM ~CONTEN~S CN : ATLANTIC RICHFIELD COMPANY WN : DRILLSlTE 15"3 FN : PRUDHOE BA% RANG: 14E iO~N: lin SEC~: 22 COLN= NORTH SLOPE STATS STATE CTR¥: USA MNE~ CON~E~TS' PRES: DI~301F RECORD TYPE 047 ** RECORD [~PE 047 ** ~UNIT TYPE CATE SIZE OCO OCO 026 065 000 000 014 065 000 000 011 065 000 000 004 065 000 000 00~ 065 000 000 002 065 000 000 0II 065 000 O00 005 065 000 000 00~ 065 · ~I UNIT TYPE CATE SIZ~ CODE 000 003 007 065 LVP 009,H03 VERIFICATION LISTING PAGE 2 RECORD tYPE 047 ## COMMENTS ## \ SCHLUMBERGER \ \ A~ASKA COMPUTING CENTER \ COMPANY = ATLANTIC RICHFIEL~i ,'OMPANY WELL = DRILL SITE 15'3 F;IEL)i = PRUDH, OE BA~ COUNTY = d~ORTH SLOPE STATE = ALASKA JOB # 10707,62716 Dlb RUN'ti, LOGGED 20-MAR-82 BOTTOM bO~:] INTERVAL TOP, LOG :INTEBVAL CASING-LOgGER BlT SIZE TYPZi HOLE FLUID DENSITY VISCOSITY PB FLUID LOS~ = 9116,0 FT. = 2678 FT. = :13.37 IN, @ 2678 := 12.25 ~,IN. c LI.GNOSU bFON ~E :c 10.0 = 36.0 '-,-10.0 = 6.0 C3 FT. PAGE 3 RM @ MEASo TEMP, RMF @ MEAS, TEMP, RMC 9 MEA$, TEMP, RM ~ BHT 2.61 ~ -59 F 2.46 ~ 59 F 1,06 ~ 59 F ,97 @ 170 F MATRIX~SANDSTONE ~-DATA FORMAT RECORD #~ ENTRY BLOCKS TYPE SIZE REPR CODE ENTRY 4 1 66 1 8 4 73 60 9 4 65 .lIN 0 ! 66 0 DATUM SPEC II~ ] CATI.ON ? bOCl($ MNEM SERVICE SERNIC.I UNIT AP1 AP~ APl AP1 FILE SIZEi PROCESS _SA. MPLEI R. EPR ID ORDER # LOG ~%PE CLASf MOD NO. LEVEL CODE DEPf: ~FbU DIb IbM DIL ILD DIL SP DIL GR DIL NPHI FDN RHOB FDN GR FDN CALl FDN DRHO FDN NRAT FDN NCNL FDN FCNL FDN DT BHC GR BBC EX 0 0 0 0 0 4 OHMM 7 0 0 0 0 4 OHMM 7 0 0 0 0 4 OH~M 7 12 46 0 ;C 4 MV 7 ! 0 0 0 4. GAPI 7 31 32 0 0 4 PU 42 68 2 0 0 4 G/C3 42 35 1 0 0 4 GARI 42 31 32 0 0 4 IN 42 28 3 0 0 4 G/C3 42 44 0 0 0 4 42 42 1 0 ~ 4 42 34 92 0 0 4 42 34 93 0 0 4 US/F 60 52 32 0 0 4 GAPI 60 31 32 0 0 4 0 0 0 0 0 0- 0 0 0 0 0 0 0 0 0 0 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 DATA DEPT SP GR NCNb DEPT . 50 GR 46,931 CALl 976.500 FCNL 9300.000 SFLU -999,250 IbM -999.250 NPHI ;12,250 DRHO 290.250 DT 4,543 ilL~ -999,250 4~).018 RHOB .999,366 NRAT ,250 GR 3,760 "9929:250420 o~50 3.750 bVP 009,H03 VERIFICATION bISTINgi PAGE; 4 GR NCNb DEPT Se GR NCNb DEPT SP G~ NCNb DEPT SP NCNb DEPT GR NCNb DEPT GR NCNb DE;PT SP GR NCNL DEPT NCNb DE:PT SP NCNb DEPT SP NCNb DEPT NCNb DEPT 9.391 GR .6.~1 CAbI 1967, 0 FCab 9200.000 SFbU -13.758 GR 106,938 ~CAbI 1806,000 FCNL 9100,000 SFLU . 5~594 CAb/ 2072,000 FCNL 9~o0.~00 srbu ~23.835 GR 26,250 CAb! 2116.0(0 FCNb 8900.000 SFbU -108.375 GR 27.312 CALl 2394.000 FCNL 8800,300 5FLU 74,35 GR 32,363 CALl 2 38,0¢0 FCN~ 8700,000 SFLU 1,378 GR 131,375 CALl 1952,000 FCNL 8690.000 $FbU .~3.6115 GR 107.750 CALI 1557,0('0 FCNL 8500,000 SFLU 6,484 GR -999,2S0 CALl '999,250 FCNL 8400.000 SFbU 34.531 GR .250 FCNL 8300,000 SFLU 32.75~ GR -999,25 CALl -999.250 FCNL '200,000 SFLU '~.,,,,,. 72.188 6.%92 615,000 13.336 4,000 ~2.609 477.500 71.250 36,6~6 12,125~ 665,000 .~3.844 12,312 728.500 29.625 27,438 12,438 917,000 111.250 ~31,031 12,352 859,500 438 12,625 ,534,000 2,104 fC0,938 14,461 338.500 1.990 99,750 -999,250 -999.250 1,629 98,688 ,250 ,605 10 .563 :999.250 999,250 2,529 NPBI DRHO ET NPH! D~H0 ILM NPH! D~HO NPHI DRHO DT NPB I DRHO ILM NRHI DT ILM NFl'! I DRHO ILM NPH! DRHO DT ILM N.LaH I DRH~ DT ILM NFH I DRH~ DT ILM NPHI DRH3~ DT ILM 39,844 .065 '~ .5.63 10,359 {40 ~18 3:48 .'~4.5e3 38,~94 !30. ~2 -3.0 2 ~S8,000 37 563 29:248 0,001 ~5,375 14,344 22,510 0,097 'f3,563 49,000 24,854 -0.003 96,000 13.047 1~6,563 .737 5 ,320 0,080 111.188 I 652 -9~9i25.0 -999 250 -999,250 . ! 322 =999,. 1'i67 50 99 , 50 -999. 50 ~,786 RHOB NRA~ ILD -RHOB NRAI 'GR ILD RHOB NRAT 'GR RHOB NRAT GR RHOB NRAI ILD RHOB NRAT GR ILD RHOB NRAT ~HOB NRAT GR RHOB NRRT GR ILD RHOB NRAT GR RHOB NRAT GR 1.938 3 13.953- I:ooo 73 938 . 2,I89 2,~80 36,656 34.219 2,166 2,912 23.844 33.281 2.395 2 4,65 27;.438 100 250 2 250 2 619 31 031 17.484 2'400 3.488~ 120,438 1.705 2.336 4.324 100.938 1,658 -999,250 -999 0 1.279 -999.250 ,,999 0 1.213 -999,250 -999,250 -999.250 1.705 bVP 009.H03 VERIFICATION LISTING SP 19.797 GR 109 GR -999.250 ~CALI -999 NCNbi -999.250 ¥CNb; -999 DEPT 8100.000 SFLU 4 SP 27.~78 GR 2798 GR -999. 50 ,CALl -99 NCN~ -999.250 FCNb: -999 .375 ,250 .250 ,727 ,500 .250 .250 NCNbi 999 50 FCNb. -999.250 DEPT SP GR NCNb~ 79~90.000 SFLU ,250 GR 999.250 ,CAb1 :999,250 FCNbi DE;PT 7.800,i00 SFbU SP 30. 34 GR GR 999, 50 ,CALl NCNbi '999,250 FCNbi DEPT SP GR NCNb] 3 154 -999 -999 938 ,250 ,250 ,250 2 * 7~,750 ,250 7700.000 $FLU 26.78! GR -999.250 ,CALf -999.250 FCNbl 2 188 -999 -999 DEPT ,1600,000 SFbU ) SP 31,516 GB 80 GR '999,250 .CALl '999 NCNbi '999,250 FCNb~ -999 0 0 SFLU 2 NCNb -999,250 FCNb 999 DEPT GR NCNb DE;PT SP GR NCNbi DEPT SP GR NCNSI DEP~ .312 .375 .250 .250 .855 ,688 .250 .250 ,080 ,938 ,250 .250 7400,000 SFLU 3!,078 GR '999.250 .CALl '999,250 FCNb~ 2 77 -999 -999 ,344 ,000 ,250 ,250 7300,000 SFLU 30,797 GR -999.250 ,CALl -999,250 FCNbi 2 .-99 999 .330 ,250 ,250 ,250 7200.000 SFLU 30,547 GR -999,250 ,CALl -999.250 ECN. L 2 93 -999 -999 .674 ,688 ,250 .250 7100,000 SFLU 3,285 NPHI DT .ILM NPHI DT .ILM NPHI~ DT NPHI:. DT ~ILM NPHI DT .ILM NPHI DT IbM NPH! DT IbM NPHI DRHO bT ~ILM NPHI DT ILM NPHI DT .ILM NPHI. DT -999.250 -959°250 -999.250 3.369 -999.250 -9S9,250 -999.250 2,656 -9~99, 0 '99 ,250 2,924 -999.250 -9~9,250 -999,250 2.182 -999 250 -959!250 -999 250 1,824 '999,250 °. o ,854 '99 ,250 -999,250 -999,250 . 1,986 999,250 -999,250 -999.250 2.328 -999.250 -9f9.250 -999.250 2,346 -999,250 -959,250 -999,250 2,572 -999,250 -999.250 -999.250 3,334 RHOB NRAT GR, RHOB NRAT <lB[ RHOB NRAI GR; .NRAT GR, RHOB NRAT ~II~[ BitOB NRAT RHOB NRAT GR; iii:[ }{HOB NRA T GR {II3£ RHOB NRAT GR~ {III[ RI'lOB NRAT NRAT PAGE; -999.250 -999.250 -999.250 3.287 -999.250 -999.250 -999.250 2.498 -999,250 -999,250 -999,250 2,967 -999.250 -999.250 -999.250 2.129 -999 50 -999')50 t.769 -999,250 -999,250 -999,250 1,9~5 -999,-50 -999,150 -999,250 2,006 -999,250 '999,250 -999.250 2.355 -999,)50 -99~. 50 -99 .250 359 -99 250 -999,250 -999.250 2,574 '999.250 -999.250 '999.250 3,479 [~P 009,H03 VERIFICATION ]~ISTING -PAGE 6 GR -.999,250 CALl NCNb 999,250 FCNL DEPT 7300,900 SFLU SP ~5,2~.7 GR GR -999,250 CA~I NCNb -999,250 FCNL DEPT 6900,300 SF~U GR -999.250 CAb1 NCNb -999.250 FCNL DEPT 6800. 300 SFLU SP ~]9.4~9 GR GR -~99.250 CALl NCN5 -999.250 FCNL DEPT 6700,900 SFLU p ~4.0E3 GR R -999.250 CALl NCNb -999.250 FCNL DEPT b$O0,O00 6FLU SP 28,547 GR DEPT 6500, ~00 SF~U , CA~I NCN~ '999.250 FCN~ DEPT 6400,300 SF~U SP -~ 2.04'.7 GR GR '999,250 CAlX NCNb -999.250 FCNL DEPT b~O0.~O0 SFLU SP ~-340 GR GR -999,250 CALX NCNb -999,250 FCNL DEPT 6200,900 SFLU Se · 8,9~ 3 GR GR :~99,250 CA~I NCNb 99.250 FCN5 DEPT 10 300 SFLU SP 6 . GR '999~250 CAG~ NCNG '999,250 FCN~ DEBT '300. 300 SFh~ '88.250 NPHI -999.250 DRHO -999.2~0 DT 3,408 IbM ~]2,938 NPHI -999.250 DRHO -999.250 DT 3 904 ILM . 91,125 NPH! -999.250 DRHO .-999.250 DT 5.066 ILM 83.688 NPHI .-999.250 DRHD 999,2~0 CT 3.639 ILM 9~7.375 NPHI 9.259 DI~HO '-999.250 2.318 IbM 80.4]8 NPH! :999.25~ DRHO 999.250 CT 3.621 IbM ~55.8X3 NPH! -999.250 DRHO -999.250 DT 5,262 IGM .56.188 NPHI -999.250 DRHO -999.250 DT 3.537 IbM .71.250 NPHI -999.250 DRHO -999.250 DT 2.45! IbM .~0.125 NPHI 999.250 DRHO 4,484 ILM ~39,03! NPHI -999.250 DRHO -999.250 DT 4,086 IbM -999,250 RHOB '999,250 NRAT -999,2~0 GR 9~.857 ILD :9 .250 999,~S0 NRA~ -999, 0 GR . 3.744 I D 999,250 R~OB -999.250 NRAT -999,~50 GR . 4,883 ILD .999,250 RHOB 999,250 NRAT -9~9.250 3.715 ILD ~9 250 RHOB 5O 2,578 I~D -999.3~0 RHOB '999,250 NRAT -959.250 2.545 -999:150 RHOB '999 50 NRAT -999,~50 9~,262 9 .250 :999.250 NRAT -999.~50 GR 3.7~5 ILD :999,25 RHOB NRA 9~9, 0 GR 2,980 ILD 9 27 -999, 0 GR ~..691 ILD 999.250 999.25~ 9~9.250 3.041 -999.250 -99~ 25~ -9~ ' .250 3,939 '999,250 '999.250 -9~9.250 5.043 -999.250 '999,250 -9!-9,250 3,916 -999.250 o999,250 -9~9,250 2.621' -g$9.250 '999, 50 '9S9.~50 2.338 -999.250 -999.250 -9~9.250  973 -99 1250 '999.25~ -9~9.250 3.986 -999.250 -999.250 -9~9.250 3.145 -999.250 -9~ . 50 1.~31 -999. 50 -999.25~ -9~9.250 1.295 bVP 'C09,H03 V · NCNb~ 9~ DEPT 590 Se GR NCNb~ -99 ,P 6 GR 99 NCNbi '99 DEPT 570 GR =99 NCNbi -99 DEPT 5.60 SP 3 GR -99 NCNbi -99 DEPT ~50 ,P 2 GR ~9 NCNb; 99 DEPT 540 ,P GR -99 NCN b*~ -99 DEPT 530 ,P GR -9; NCNb~ -99 DEPT Se 3 NCNbi 99 DE:PT 510 ,P -5 GR .-99 NCNbl 99 DEPT 500 SP 1 GR -~9 NCNb~ -99 DEPT 490 ER1EICATXON LI&TING 0.844 GR .250 ,CALl .250 FCNbi 37. -999, -999, 0.000 $FLU . 0 ;CALl 9 · 0 FCN bl 3 42. -999. -999, 0,000 $FLO 1.'~12 GR 9, 50 ,CALI 9,250 FCNbl -999. -999. 0,000 SFbU 0,482 OR 9,250 ;CALX 9,250 FCNb~ 969 250 25O 0.000 $FLU 5,781 GR 9.250 ,CALX 9.250 ~FCNbl 4c, 4 406 250 250 0.080 ,FLU 9,! 3 GR 9. ~0 ,CALX 9, 0 FCNbl 750 250 250 0,000 ,5FLU , 50 .CALl 9,250 FCNb; NPHI DT 0,000 8FLU 2.~64 OR 9. 50 ,CAL! 9,250 FCNb~ NPHI DT 0,000 SFLU 0,047 GR 9,250 .CALl 9,250 FCNb~ IL~ NPHI DT 0.000 ,FLU 2.188 GR ,250 ,CALl .250 FCNbi 2.5.~9 IbM 66,375' NPHI '999,250 !£REO -999.250 DT 0.000 ,FLU 8.~97 GR 9. 50 ,CALl 9,250 FCNb~ 3, 50, 999. 999. 0.000 $FLU , .-99 . -999. 44, -999. -999, . 2999, 999. 943 125 250 250 531 25O 25O 406 250 250 465 781 250 250 459 594 250 250 893 155 250 250 047 500 25O 25O 562 999. -'999. .?. 68. -999. -999. ILM NPHI :[;-RE 0 DT ILN NPHI DT ILM NPHI DT IbM NPHI. DT NPHX, DT NPHI DT IbM NPHI~ DT IbM -999.250 -9c. 9 250 -999:250 1,890 -999.250 -9~9,250 -999.250 1,457 -999,250 -9~9,250 -999.250 2.4t8 -999.250 -959,250 -999,250 , 2,568 999,250 '959,250 -999,250 959, 0 2,539 '999.250 -9S9,250 -999.250 6,I37 '999,250 '9~9,250 '999,250 .363 -99 ,250 -9~,250 -99 ,250 -999,250 -9~9,250 -999.250 4-148 -999, 50 -959,250 -999.250 1,61~1 RHOB NRAT RHOB NRAT III[ RHOB NRAT ILD RHOB NRAT GR~ R~IOB NRAT GR~ ilD[ NRAT GR~ RHOB NRAT (ID[, RHOB NRAT RHOB NRAT G R'~. ILD RHOB NRAT :ID[ RHOB NRAT GR, ILD PAGE 9,250 -999,250 1.529 .999.250 999.250 999,250 1,219 -999,~50 -999. 50 -999,250 2.37 3 .-999.250 999.250 -999.250 2,270 -999,250 -999,250 -999..250 600 -999,250 -999.250 .2,-535 -999,250 -999,250 -999.250 6,156 -999,250 -999,250 -999.250 2,162 '999,250 '999'250 '999,250 1.536 -999.250 -999.250 -999.250" 4.523 -999.25O -999.250 -999.250 1.7f8 5¥P 009,H03 YB~¥ICATION blSTIN~i P~£ 8 SP NCNb -! -~9 -99 -! -99 2 ~9 -99 45O 44O -99 43O -99 0 4.~5 -~9 -99 =1 =99 4O0 -99 $~0 -5 =~9 -99 DEPT SP NCNb DEPT SP NCNb DEPT SP NCNb DEPT SP GR NCNb DEPT SP GR NCNb DEPT SP NCNb DEPT SP GR NCNb DEPT SP GR NCNb DEPT SP NCNb DEPT SP NCNb DEPT '8O o.o~oo s~bu ~ s9s ~.5 3 GR 250 FC"b '999o ~ 0 o,~oo seuo ~.,~ 9,~oc~u~ -gug,~so o,~oo seuo ~.9~ ,.~o ~u ~o.6u~ 9,~so c~uz -99~,~so 9.~so ecru -999.a~o o.~oo s~to s.~ .4( 6 GR -e9.312 ,250 CA~ -999,25) 9,250 FCN~ -999.250 0,000 &FLU 4,789 6,28~ GR 46.2~ 9,250 CAL~ 999,250 9.250 FCNb :999.250 o.ooo sfr~ , ,250 CA~I =999,250 ,250 FCNL -999,250 0.000 SF~U 5,348 2,781 GR 5~.9~8 , 999,250 0,000 &F~U 4,426 4,906 GR 47,4~9 9,250 CALl -999,250 9,250 FCN~ -999,250 0,000 SE'GU 6,371 NPHI DBHO NPHI DRHO DT ILM NPHI D~HO NPHI DRHO DT DRHO DT IbM NPHI DRHO DT NPHI PRHO NPHI DRHO NFE I DRHO ET NPHI DRHO DT NPHI DRHO -9c;9 250 -999:250 -9S:.9. 250 3,430 -99 ,250 -999.250 -9S9,250 9 984 . =999.250 -999.250 -999.250 .99~ '48° ,250 -999.250 -999,3.~ 0 4,781 -999.250 -999.250 -999,250 311 -~:~o ..999.250 -999.3~0 4,402 -999,250 -999.250 -9S9.250 3.215 -999,250 · '999. 250 -9C.'9. 250 4,816 -9c..9,250 -999.250 -gs9.250 5.008 -999,250 -999. 250 -9S9,250 3,488 =999,250 -999, ~.50 -9S9, 50 '~, 5.04 AH(lB NRAI I. LD RHOB NRAT GR ILD NRA~ GR ILD RHOB NRAT (:iR IbD RHOB NRAT RHOB NRAT GR RHOB NRA~ ILD RHOB NRA~ RHOB NRAT RHOB NRA~ ILD RHOB NRA~ ILD -999.250 -999.250 -9'39.250 3.629 .-9~.9.250 999,250 -9!9.250 8.312 -9~9 250 -999 250 -9~ 9 250 . 3 922 999 250 .,.999 253 -9~9 250 5.105 -999.25O -999.253 -9~.9,250 3. ,999.250 -9c~9.250 4.840 -999.250 -999,250 -9S9.250 2.900 -9S9.250 -999.250 -9~;9.250 5.145 -999.250 -999.250 -9c. 9.250 4.738 -9c;9.250 -999,250 -9c. 9,250 3,129 -9!9.250 -999.250 -g~9.250 5.492 bVP S?t GR NCNb DEPT SP GR NCNb DEPT SP GR NCNb DEPT SP GR NCNb~ DEPT SP GR NCNb DEPT SP GR NCNb~ DEPT SP GR NCNbi DEP~ SP GR NCNb~ DEPT SP GR NCNb~ DEPT SP GB NCNb~ DEPT GR NCNb~ 009~03 YEBIF~CATION -35.156 GR -999,350 CALI -~99,250 FCNb 55. -999, -999. 37g0,0¢ 0 SFLU -23,281 GR -999.2t0 CALl -999.250 FCNL , 64. ,-.999. -999. 36C0.0(0 SFLU -48,438 GR °999.250 CALl -999,250 FCNL 63. .-999. -999. 3500.000 $FLU -27,938 GR -999.250 ,CALl -999,250 FCNbi O. 62, -999, -999. 3400,000 SFLU '17,781 GR -999,250 CALl -999,250 FCNb , -999, -999. 3300,000 $FLU -31.000 GR '999.250 ,CAbI '999.250 FCNb~ . -999, -999. 3200.000 $FLU ~59 7.5 GI~ ' 99.*~50 ,CALl . 51, -999. -999. 3100.000 SFLU -41.063 GR -999,250 ,CALl -999,250 FCNb~ . 58, -999, -999, 3000,000 SFbU '17,578 GR '999,250 .CALl -999,250 FCNGi 2~ -99~, -99 . 2900,000 SFLU -36,531 GR -999,250 .CALl -999.250 FCNb; . 60, -999, -999, 2800,000 $FLU -59,~38 GR -999, 50 .CALl -999,250 FCNbi 312 250 253 2700.000 SFLU 598 688 250 253 777 78t 250 250 559 406 250 250 312 250 250 438 594 250 250 666 563 250 250 959 281 250 250 611 406 250 250 174 094 250 250 NPHI DRHO DT NPHI DRHO DT IbM NPHI DRHO DT NPH! DT NPHI DRHO DT ~IbM NPHI DT ILM NPHI~ :£REO DT ~ILM NPHI~ DT NPHI DT ILN NPHI DT -999,250 RHOB -999.250 NRAT -999.250 GR 4.266 ILD -999,250 RHO8 -999.250 NRAT -999.250 GB 4,320 ILD -999,250 RHOB .-999,250 NRAT -999,250 GR 0,420 IIn£ -999,250 RHOB -9~9,250 NBAT -999.250 3.078 :.Ig[ -999.250 RHOB -999,250 NRAT -999.250 GR 2.789 iIg£ -999,250 RHOB -9~9,250 NRAT -999.250 GR~ 1,589 ~IU[ -999,250 RHOB -9S9.250 NRAT -999.250 2.309 ~ID£ '999,250 RHOB '9S9,250 NRAT '999.250 GR, . 2,516 999,250 R~OB -999,250 NRAT -999,250 ,99~,638 !ID[ ,250 RHOB '959,250 NRRT '999.250 GRi 2.102 IbM 1.326 30,328 NPHI -999.250 RHOB -999,250 :£~EO -9S9,250 :NRAT -999.250 DT -999,250 809 ILM . 1,267 P~{-E -999.250 -999.250 -999.250 4.727 -999,250 -999,250 -999.250 4.129 -999. 50 -999.~50 -999.250 447 -999.250 -999.250 250 999,250 '999.250 2.668 :999.250 .999,250 -999.250 1.368 99,250 -999.250 2.244 -999.250 -999.250 -999.250 , 654 -99 ,250 -999.250 -999,250 1,540 -999.~50 -999, 50 -999,250 1.132 -999.250 -999.250 -999.250 1.047 bYP 009,B03 VERIFICATION LISTING .PAGE 10 SP ~58,219 GR GR -999,250 CALl NCNL -999,250 FCNL DEPT 2561.000 SFLU SP 11.383 GR GR -;99,250 CALl NCNL -999,250 FCNL !'5.563 -999.250 -999.250 4.789 . 21,500 999.250 -999,250 NPHI D HO NPHI DI~HO FIDE NAME .SER~IC,O01 SERVI.ZE NAME{ VERSION # DATE = MAXIMUM LENGTH : 1024 FILE TYPE NEXT FILE NAME -=999 25O -9~ 9. 250 2000.000 -999,250 -999.250 -9~9.250 RHOB NRAT ILD RHOB NRAT -999.250 -9~9 50 2000.900 -9c, 9.250 25O ## TAPE TRAILER SERV1 2E N A M ":.1 **.SERVI~'' DATE ~82/04/15 ORIGIN : * TAPE NAME : CONT1 ~UATION NEXT COMMENTS :T%Pg~ COMMENT8 ## REEL TR~Z/ER ## SgRVI:E NAME DATE ~$2/04/15 ORIGIN : REED NAME :R~EL ID CONTINUATION #501 NEXT REEL NA~E COMMENTS :REEL COMMENTS CURVE SPECIYICATIOKS Company '. ARCO ALASKA, INC. Well D.S. 15-3 F~eld PRUDHOE BAY. Ccuntv, State N. SLOPE, ALASKA Date 4-2-82 Curve Kame (Abbrev.) Standard Curve Name Logs Used Scale O-lO0, 100-200 0-10 0-3250 0-1000 60-0 GR · CCL. Gamma Ray Casin~ Collar Locator CN-Mult~spaced , LSN Long Spaced " · SSN Short Spaced "' CN Compensated Nuetron ECC NUMBER 1266,00 ~RCO ALASKA INC, 5 CURVES : LEVEL SPACING 0,5000 PAGE '1 [CO ALASKA INC, .S. 15-3 DEPTH LONG SPACE SHORT SPACE COMP, GAMMA CCL NEUTRON NEUTRON NEUTRON RAY FT, ~ API 8510.0 291,5 252.3 33,73 62,6 0.80 8530,0 291.5 2~9.2 ~3.~0 63.7 0.80 8550,0 258,6 211,3 3~,68 5~,5 0,80 8590,0 2~9,4 ~10.1 ~7,22 1 8~,1[. o ~ ~+ D~_~ ~,~,8.2 ~A.,_. 87 78.8 0.80 8630,0 385.6 29~.5 '93'~1 32.1 0,80 8650,0 260,1 175,8 ~7,67 .~2,2 0,80 8670 8710.0 8770,0 328.2 2~1,3 ~5.39 18,2 0,80 8790,0 ~10.0 300.0 ~1,21 17,8 0,80 8810,0 ;582.5 268.8 ~0.1~ ~9,5 0,80 8830,0 ~56.5 28~,7 ~6.90 17.8 0'80 8850.0 5~2,~ 371,0 ~6,1q ~8.2 0,80 8870.0 571,~ 8890,0 ~95,0 8910,0 ~37,6 ..... ~98,2 .... '{~'8,08 17,8 0,80 8~30,0 ~65,9 327,0 17.90 ~7.0 0.80 8970,0 381,7 306.8 ~13 18,2 0,80 89~0,0 3~5,1 252,3 P7,15 39,9 0,80 [CO ALASKA ,S. 15-3 INC. PAGE 2 DEPTH FT. LONG SPACE SHORT SPACE CORP. GAM.A CCL NEUTRON --N-EUTRON' "~IEUTRON RAY ...... ,% .............. API~ 9010,0 329,7 2N'7,~+ ::>6, q'6 2~,~ 0,80 9030,0 3~8,1 27~ 3 ~6, L6 18 80 9070.0 3~.9.o ?~.~5 ~~57 ~8.o .o.8.o~ . 9090,0 320,5 27~ ~:1,30 ~,2 0.80 ...... 9_~0.0 3~5~ e68~ )6.Z~ 22.6 0.80 9130,0 299.9 ~ 23~.~ ~9,61 22.0 0.80 9150.0 3~7.~ 267.0 ~6~79 Ei,5 9170.0 2' 21' 9190,0 9; 9~ 9; 0,0 393.2 350.8 ~8,~0 58,5 '0,80 9290,0 0.0 'xq'o, 0 0,00 0,0 -~,20