Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-058
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-058 6.50-029-20124-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12515 12475 8936 9205 None None 8191 Casing: Length: Size: MD: TVD: Burst: Collapse: Surface 2506 18-5/8" 18 - 2524 18 - 2524 930 870 Intermediate 4314 13-3/8" 17 - 4331 17 - 4176 5380 2670 Tieback 8187 9-5/8" 15 - 8202 15 - 7342 6870 4760 Liner 1356 7" 8054 - 9410 7216 - 8365 7240 5410 Liner 366 4-1/2" 9250 - 9616 8229 - 8558 8430 7500 Perforation Depth: Measured depth: 10289 - 12470 feet True vertical depth:9012 - 8936 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 14 - 9261 14 - 8238 9205 8191Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Packer Liner 3010 9503 - 12513 8448 - 8935 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 24960086135 548975 860 7436 154 405 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8934 Sundry Number or N/A if C.O. Exempt: 321-392 No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Extended Perf w CTU Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028305 PBU C-03C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-3/16" x 2-7/8" By Samantha Carlisle at 9:05 am, Sep 22, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.09.22 08:19:35 -08'00' Stan Golis (880) RBDMS HEW 9/24/2021MGR14OCT2021DSR-9/22/21 SFD 9/28/2121 ACTIVITY DATE SUMMARY 8/30/2021 ***WELL S/I ON ARRIVAL***(perf) SET 4-1/2" X-CATCHER SUB IN X-NIPPLE @ 9184' MD. PULLED RK-DGLV FROM ST#2 @ 8014' MD. PULLED RK-OGLV FROM ST#3 @ 6120' MD. PULLED RK-LGLV FROM ST#4 @ 3308' MD. SET RK-LGLV IN ST#4 @ 3308' MD. SET RK-LGLV IN ST#3 @ 6120' MD. SET RK-OGLV IN ST#2 @ 8014' MD. PULLED 4-1/2" X-CATCHER SUB FROM X-NIPPLE @ 9184' MD.(empty) ***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF WELL STATUS*** 9/13/2021 T/I/O/OO = 1740/1740/480/0. Temp = SI. Bleed IAP (Pre Coil). No AL. Coil RU installed from TC to reverse out skid & tanks. IA FL @ 7240' (774' above #4, S/O). Bled the IAP from 1740 psi to 530 psi in 4 hours (Production, #35). During the IA bleed the TP and IA FL remained unchanged. No change in the IAP during the 30 minute monitor. FWPs = 1740/530/480/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 9/15/2021 CTU #9 - 1.75" coil x 0.156" wt Job Objective: Ext. AddPerf MIRU CTU. Make up log/drift BHA with 2.2" GR/CCL carrier and 2.25" JSN nozzle. RIH and attempt bullhead kill. Well has marginal injectivity for sweeping gas once liquid packed. Drift to 10700' and perform passing no-flow test to confirm well kill. Log up from 10,700' to 9,000 painting a white/yellow tie-in flag. Continue to maintain hole fill while POOH. Confirm well dead at surface. Recieve good data (+14.5' correction). Town analyzed data. Correlate to Baker Hughes RPM Log dated 30-Aug-2012. Make up 160' of 2" MaxForce Perf guns, 6 spf and RIH. ***Continued on 09/16/21*** 9/16/2021 CTU #9 - 1.75" coil x 0.156" wt Job Objective: Ext. AddPerf RIH w/ 160' of 2" MaxForce Perf guns, 6 spf. Rih to flag, correct depth. Perforate 10289' - 10449'. POOH maintaining hole fill. Confirm well killed and surface and lay down perf gun assembly. FP Well and Rig Down CTU. ***Job Complete*** Daily Report of Well Operations PBU C-03C 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will planned perforations require a spacing exception?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStrastigraphicExploratory Authorized Name: Authorized Title: Authorized Signature: Date: Contact Name: Contact Email: Contact Phone: COMMISSION USE ONLY Commission Representative: Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other: Post Initial Injection MIT Req'd? Spacing Exception Required?Yes Yes No No Subsequent Form Required: Approved By:Date: APPROVED BY THE COMMISSIONCOMMISSIONER C-03C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-058 50-029-20124-03-00 341H ADL 0028305 12515 Intermediate Tieback Liner Liner Liner 8934 4314 8187 1356 366 3010 12475 13-3/8" 9-5/8" 7" 4-1/2" 8936 17 - 4331 15-8202 8054 - 9410 9250 - 9616 9503 - 12513 2430 17 - 4176 15-8202 7216 - 8365 8229 - 8558 8448 - 8935 None 2670 4760 5410 7500 10530 None 5380 6870 7240 8430 10160 10537 - 12470 4-1/2" 12.6#L-80 14 - 92619008 - 8936 Surface 2506 18-5/8" 18 - 2524 18 - 2524 930 870 4-1/2" Baker Packer No SSSV Installed 9205, 8191 No SSSV Installed Date: Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 PRUDHOE BAY, PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm.Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval. 3-1/2" x 3-3/16" x 2-7/8" By Samantha Carlisle at 2:54 pm, Aug 09, 2021 321-392 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.08.09 14:04:17 -08'00' Stan Golis (880) X DLB 08/09/2021 MGR09AUG2021 DSR-8/9/21 10-404 2430 PBU dts 8/10/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.08.10 12:16:01 -08'00' RBDMS HEW 8/11/2021 Extended Perf C-03C PTD:212-058 Well Name:C-03C CTU Extended Add Perf API Number:50-029-22667-01 Current Status:SI Rig:SL, CTU & Surface Deployed TCP Guns Estimated Start Date:8/20/2021 Estimated Duration 3days Program Date 8/3/21 Permit to Drill Number:212-058 Regulatory Contact:Abbie Barker (907) 564-4915 (O) First Call Engineer:Wyatt Rivard (907) 777-8547 (O)(509) 670-8001 (M) Second Call Engineer:Noel Nocas (907) 564-5278 (O)(907) 229-9532 (M) Expected Rates 180 BOPD, 50 BWPD and 14 mmscfd (30 Day IOR – 36) Current Bottom Hole Pressure:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2430psi (Based on .1psi/ft gas gradient) Last SI WHP:1990 psi (Taken on 3/2/2018) Min ID:2.36” ID LTP at 9495’ MD Max Angle:98 deg at 12176’ Reference Log:BHI RPM log dated 8/30/2012 Brief Well Summary: C-03C experienced a significant increase in formation gas, increasing from virtually no gas to 16 MMSCFD in November 2020. PPROF diagnostics showed that a polar choke set in 2017 had failed. A subsequent polar choke set in July 2021 successfully isolated majority of gas in toe section but well would no longer flow to the high pressure header afterwards (well is a straight shot to GC3 with no LP access). Additional zone 1A perfs will be shot to bring in more competitive, low GOR production and allow well to flow to HP. Objective:Add perforations in zone 1A to increase fluid rates and allow well to flow to HP fulltime. Slickline 1. MIRU SL unit and pressure test 2. RIH and pull/reset a deep (Station #2 at 8014’ MD) kickoff GL design per GL Engineer. 3. RDMO Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the extended perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 4. MIRU Coiled Tubing Unit, spot ancillary equipment and PT. 5. MU GR/CCL Logging tools and 2” gun drift. 6. RIH, log and paint flag coil at ~10290’. 7. POOH and confirm good data. Obtain corrected flag. a. Correct to BHI RPM log dated 8/30/2012 8. Bullhead ~200 bbls of 8.4 ppg 1% KCl or equivalent down the tubing to the formation to kill well ahead of extended perforations. * -00 DLB Extended Perf C-03C PTD:212-058 a. Wellbore volume = 9500’ X .0152bpf + .0079bpf x 1000’ = 150 bbls b. Freeze protect tubing as needed. 9. At surface, prepare for deployment of TCP guns. Assure excess fluids available if needed to keep hole full. 10. Confirm well is dead. Bleed any pressure off to returns tank. Kill well w/8.4 ppg 1% KCl or equivalent as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 11. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 12. Break lubricator connection at QTS and begin makeup ofTCP gunsperTable1: C-03CProposedExtended Ad-Perf Gun Run below. Gun Run #Perf Top Perf Bottom Perf Length 1 ±10289 ±10444 ±155 Total ±155 Table 1: C-03C Proposed Extended Ad-Perf Gun Run 13. RIH and correlate to flag. 14. Pickup and perforate intervals per Table 1: C-03C Proposed Extended Ad-Perf Gun Run. POOH. a. Note any tubing pressure change in WSR. 15. POOH. Stop at surface to reconfirm well dead and hole full. 16. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 17. RDMO CTU. Arrange for PBGL for well kickoff. 18. RTP well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet Standing orders flow chart included with this sundry request. *See note above regarding kill methods if pressure observed at surface after perforating. MU lubricator Extended Perf C-03C PTD:212-058 Wellbore Schematic Extended Perf C-03C PTD:212-058 Extended Perf C-03C PTD:212-058 Extended Perf C-03C PTD:212-058 Coiled Tubing BOPs Extended Perf C-03C PTD:212-058 Equipment Layout Diagram Extended Perf C-03C PTD:212-058 Standing Orders for Open Hole Well Control during Perf Gun Deployment Extended Perf C-03C PTD:212-058 Extended Perf C-03C PTD:212-058 Extended Perf C-03C PTD:212-058 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: August 6, 2021Subject: Changes to Approved Sundry Procedure for Well C-03CSundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-5245 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 07/22/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL FTP Folder Contents: Log Print Files and LAS Data Files: Well API # PTD # Log Date Log Type PBU 15-48C 500292263503 211-030 6/16/2021 CBL PBU B-07A 500292028501 214-091 1/20/2021 CBL PBU C-03C 500292012403 212-058 7/10/2021 PPROF PBU C-29B 500292147202 214-049 7/10/2021 PPROF PBU C-41B 500292238502 213-104 6/26/2021 CBL PBU F-10C 500292041003 213-086 7/11/2021 CBL PBU P2-34 500292255800 195-066 6/17/2021 CBL Please include current contact information if different from above. Received By: 07/23/2021 37' (6HW By Abby Bell at 9:33 am, Jul 23, 2021 Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-058 6.50-029-20124-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12515 12475 8936 9205 None None 8191 Casing: Length: Size: MD: TVD: Burst: Collapse: Surface 2506 18-5/8" 18 - 2524 18 - 2524 930 870 Intermediate 4314 13-3/8" 17 - 4331 17 - 4176 5380 2670 Tieback 8187 9-5/8" 15 - 8202 15 - 7342 6870 4760 Liner 1356 7" 8054 - 9410 7216 - 8365 7240 5410 Liner 366 4-1/2" 9250 - 9616 8229 - 8558 8430 7500 Perforation Depth: Measured depth: 10537 - 12470 feet True vertical depth:9008 - 8936 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 15 - 9261 15 - 8238 9205 8191Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Packer Liner 3010 9503 - 12513 8448 - 8935 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 62840059219 544628 350 17409 87 249 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8934 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Install Polar Choke Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028305 PBU C-03C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-3/16" x 2-7/8" By Meredith Guhl at 1:21 pm, Jul 20, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.07.20 13:16:15 -08'00' Stan Golis (880) MGR29JUL2021 SFD 7/20/2021RBDMS HEW 7/22/2021 DSR-7/21/21 ACTIVITY DATE SUMMARY 7/10/2021 CTU #6 w/1.5" CT Job Objective: PPROF for gas entry, contingent gas shut off with CIBP MIRU CTU, MU SLB PPROF logging tools. RIH with well flowing, Log down pass at 60 FPM from 9,375' and hit lock up at 11,436'. Had to choke well in to get to bottom of logging interval. Discussed with OE and decided to make up only passes at full open choke. Make up pass 12,000' - 10,400' at 90 fpm. Make 5 min stop counts 12,000', 11,650', 11,170', 10,750', and 10,450'. Begin up pass 12,000' - 10,400' at 30 fpm. ***Job in Progress*** 7/11/2021 CTU #6 w/1.5" CT Job Objective: PPROF for gas entry, contingent gas shut off with CIBP Continue logging up pass 12,000' - 10,400' at 30 fpm w/choke fully open. Logged up pass 12,000' - 10,400' at 60 fpm, painted flag 11,650' ctm. Pooh w/BHA. On surface w/logging BHA, download data. Gas flow appears to be coming from polar choke. Consult with OE and decided to proceed with deep set polar choke with 3/16" orifice. MU NS polar choke and RIH. At flag corrected EOP = 11,644.1' + 9.24' (EOP to COE) = 11,653.34'. Correct counter and set NS 2-7/8" Polar Choke (3/16" orifice) at 11,980' MD. Pooh w/BHA. Begin RDMO CTU. ***Job in Progress*** 7/12/2021 CTU #6 w/1.5" CT Job Objective: PPROF for gas entry, contingent gas shut off with CIBP Completed RDMO CTU6. Contact PCC and bring well online. ***Job completed, well flowing on departure*** Daily Report of Well Operations PBU C-03C Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-058 6.50-029-20124-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12515 12475 8936 9205 None None 8191 Casing: Length: Size: MD: TVD: Burst: Collapse: Surface 2506 18-5/8" 18 - 2524 18 - 2524 930 870 Intermediate 4314 13-3/8" 17 - 4331 17 - 4176 5380 2670 Tieback 8187 9-5/8" 15 - 8202 15 - 7342 6870 4760 Liner 1356 7" 8054 - 9410 7216 - 8365 7240 5410 Liner 366 4-1/2" 9250 - 9616 8229 - 8558 8430 7500 Perforation Depth: Measured depth: 10537 - 12470 feet True vertical depth:9008 - 8936 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# L-80 15 - 9261 15 - 8238 9205 8191Packers and SSSV (type, measured and true vertical depth) 4-1/2" Baker Packer Liner 3010 9503 - 12513 8448 - 8935 10160 10530 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 6603509221716689 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Wyatt Rivard wrivard@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907.777.8547 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8934 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Install Polar Choke Operations shutdown Change Approved Program 5 N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028305 PBU C-03C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 3-1/2" x 3-3/16" x 2-7/8" 194 15830 72 680350 By Samantha Carlisle at 11:35 am, Mar 19, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.03.19 10:35:18 -08'00' Stan Golis (880) MGR24MAR2021 SFD 3/24/2021RBDMS HEW 3/22/2021 DSR-3/19/21 ACTIVITY DATE SUMMARY 2/22/2021 ...Well flowing on arrival... (HES EL - pprof) PERFORM PRODUCTION PROFILE PER PROCEDURE FROM 9,350' - 10,160' (deviation) SPINNER CALIBRATION INDICATES 82% OF FLOW COMING FROM 3-1/4" LINER, 18% OF FLOW COMING FROM ABOVE LTP. STOP COUNT AT 9,580' - FBHP = 1,254 PSI, 154 DEG F, WHP = 690, WHT = 85 DEG F. SHUT IN WELL AND MONITOR 90 MIN. PERFORM DOWN/UP PASSES FROM 9,350' - 10,160'. (possible crossflow down identified at 10,030' from spinner overlay and stop counts). ***Job Complete. Well shut in on departure. WPO to POP.*** 3/8/2021 T/I/O = 720/400/500/40. Temp = 87*. WHPs (For DP). SV = C. WV, SSV, MV = O. IA, OA, OOA = OTG. 10:40 3/15/2021 CTU 9 1.75" CT 0.156 WT Objective: Set downhole choke. MIRU, RIH w/HES 2.2 carrier gr/ccl + 2.25 JSN. RIH and tag Polar choke at ~12,060' CTMD. Log OOH from 12,060-9,050' Flag pipe at 11,950'. ****Job Continued on WSR 3/16/21*** 3/16/2021 CTU 9 1.75" CT 0.156 WT Objective: Set downhole choke. Download Jewelry log. MU NS Polar choke BHA. Correlate to SLB MCNL date 8-30- 2012 (-7' correction). Corrected EOP at flag 11,934.21'. RIH with 2-7/8" NS polar choke w/.25" orifice and set at 12,030' ME. Re-POP well with Ops. RDMO ****Complete**** Daily Report of Well Operations PBU C-03C Samuel Gebert Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 03/15/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU C-03C (PTD 212-058) PPROF 02/22/2021 Please include current contact information if different from above. PTD: 2120580 E-Set: 34781 Received by the AOGCC 03/15/2021 03/15/2021 I I OO m co m Im a Z E m E a `9 NI ca N Z m co • Z W E O " O > E O N •f0 LL E > a .N a o) U y 2 3 W 3 co' i E > ayi E Q w m LL c / }I o Z c N w u, .N c� Z -o E o Z c° > a) a) o N > a ° y y L m t o. ••O col m m O > Z Z Z a) O N O (0a fa E D N_I a- N_I Z cn > m my m O m o o C7 co O O O Q N c m r r (d N °- o N + N d J + n o CO .5 CO CO a U aL m o j ° a O a M M >. y N U a m a 2 a 0) I- m 0 m I 0 c C Z ° ° ow °O d rn am D am m� D iaQ cid aiQ uiQ Z C a) cn m m '.J Z+ ca m E 2 o f m m 2 0�i LL�1 l- CCi LL Ctl ....... a.o E o m o m aJ 2= 2w a� 02 •ug •02 .u2 rn o ce m rn o .o t t aE) d aE) m E. E cNi�12 � m� cocE Et O CO Ea Em Em Q to U E c .S �L �L m D > d > D E E vU w °UI It) It°U J CO m D'a D'a O m m a O m > m a a)r) r) r) cn Ce Q 112 E 0 2 2 2w 2w 2CC F-C[ 2 21X F-0 5 wo- wo wo W /O O j C ,O N N N C) f+) M M M M C) M M M _I M �y U - > N 0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 a- W m y N -CV.. N N N NN N N N N N N N ce ° m V r r r CO (0fD cD CO (O CO CD M C., M M J CO ce N --- --- M M (0 f0 (D (° CD CO I,- h n a v )C c c c c c c c c c C C W W a) a) a) a) m a) a) a) a) Cl) a) J I 2 Z a a a a a a a a a a a U m jp O U O O O O 0 0 0 O O 0 0 Z 8 « a �° co in in co co COIn CO CO LO CD _ O co in In CO co C) l!) LU I I,- Q a) a I m fn ,- .N- O O O J e. 1 CL 0 01 °' c cn CD 0 0 IX) )C LO to co cn 0 G ) co O N O 0 co co (° C° co co G 0 •� to ch 0) 0) w a) °) a) w rn a) o) OIN a. a) NE E o. U00 CO C J 0 rez° Q M O 0 I -J0 o 0) 5 Z !o J 2 0 0 0 0 0 G = N in /� Q N 0 a) 0 rn�v W m 0 J0 (C.) N co LO N N (/) o 0 vi ICC a j , i o CC Z w w w w 15 0E J >0 a) 0)) aa)) .> '> '> '> co 2 2 .N .co N w a Z cn co Cl) CC CC m >. m m CO CO y y m CO m CO m m m A c c c c c o o m o o m O 0 0 0 c ,0 0 0 E E 0 0 l co re Z u u u > > E > > E •- To m a y N Cl) a) a V CO V V co •0 •o) 'rn 'v) C) 0 0 a Z z c c O c c O 0 b a b o 0 Z O .+ co ° _1 a) m U) L. a o o °N- r) aoo aoo COoa) rn rn rn o F= y . 2 E M COcn CO CO CO CO CO rn rn rn rn N Q Z .0 Ca) co O N N N N N N N N N N N N N O O .2 W 0 Z N N N N N N N N N N N N Q < C m .+ LL L v ii U •.- Z 0 , •-- °w 0 m c G d Q a a a �° Z W c 2 0 0 0 0 0 0 0 0 0 E D Q S J F. 0 C'1 F- 0 m o) c.3 a 0 0 a o a 0 o O o ° 0 0 0 0 0 d 2 ww 0 FT 3 o FT w W IX J w J J w J J W w W W W o 0 M a /Z/Z a0 n C7 c z O •E O >- >- )- o U O a a U co aa) 410 M N0) (n 4 = O ° w O L T o U y U > U m c Lc) ai Z H rn Q Z o ii >, 0 0 Z y o Z ) E 0) W U) ) o 0 > ° O U a @ QQ W CO COd d Q 0) W o a W C M M M M W O O O U U J O m 0 0 0 0 0 J II E U U U U = U O I''0 ai ai ai ci ? It LT ii cri c < Q Y 0_COCO d g O g 0 o 0) Z /Z E w co In m to Wp 0 0 0 0 in O E >- /} r o JN W 0) N N N N N W U 1 0 / y I a c N = cc W W W W N I to /� j U N N N N l0 N �y O O N N N N E Cl) E O 0 W M z ai a/ OJ n o 0 0 0 m a ii E I y W w v, °, u, ° m m rn a U m 0 0 E E ca 1 Z 8 � w Q o o (n O 0 J a c J `) 0 o E w O 2 0 0 C� c� o 0 00 o co G N ON Q U = v �Z J � U >- } } _ o E I-- Z N Z. Cl) w N V 2 f0 C co>- a N Y O 0) E illo COCO rn Lo c o E- E W t c .. C �/� 0 5 rn y ill v0 p m Cl) ° ? o '�\ O - c IN QCe m I- Q ° n ° m O I z o '' Ci E 0 c i7 2 0 �; 10 ° Z cn cr) = N co 01 OS CO N a) y 3 A 0 0 0 0 0 al E a rn I Z m m m m I O Z co o rn 'rn rn 'm o a r ao J o 0 0 0 0 J E a ; / o ; 5. co co 0 0 0 w W CO - CO 0) 0) O) 0) o) C W E a m N N N N N N N N N d W p O) Q 0) re p c ` •> E E z y y ) ', 0 co 0) O ,,� y Z a ° o III c C U U U U • 0 O n o E a a) 0 I p p 0 0 0 0 p y LL O 2 0) I O O a 2 1J J W W W W J 3 j z 0 a 0 0 I 0 . / STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION COM N REPORT OF SUNDRY WELL OPERATI NS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown ❑ Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-058 3. Address: P.O.Box 196612 Anchorage, Development p Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20124-03-00 7. Property Designation(Lease Number): ADL 0028305 8. Well Name and Number: PBU C-03C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ry, f:,,' ,; Total Depth: measured 12515 feet Plugs measured None feet true vertical 8934 feet Junk measured None feet ,:-: t .',, Effective Depth: measured 12475 feet Packer measured See Attachment feet true vertical 8936 feet Packer , true vertical See Attachment feet ' ,. .�3 ,i Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 61 20"Conductor 19-80 19-80 0 0 Surface 2506 18-5/8"96.5#K-55 18-2524 18-2524 930 870 Production 4314 13-3/8"72#L-80 17-4331 17-4176 4930 2670 Liner 2052 9-5/8"40#L-80 16-2068 16-2068 5750 3090 Liner 6172 9-5/8"47#N-80 2043-8215 2043-7353 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10537-10567 feet 10570-10600 feet 10604-10634 feet 10637-10667 feet 10670-10700 feet 10800-11130 11210-11570 feet 11900-11950 feet 12140-12350 feet 12400-12470 feet True vertical depth: 9008-9007 feet 9006-9005 feet 9005-9004 feet 9004-9004 feet 9004-9004 feet 9006-9000 8996-8987 feet 8994-8992 feet 8971-8947 feet 8941-8936 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 15-9261 15-8238 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 244 16838 41 0 730 Subsequent to operation: 213 9913 36 0 677 14.Attachments:(required per 20 AAC 25,070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ ❑ WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Summerhays,Nita M ,IPRO Technologies) Email Nita.Summerhays@bp.com Printed Name Summerhays, ita I (WIPRO Technologies Title Petrotechnical Data Manager Signatu - �, /�j�/'7 _ ,1.i//l'i �,f���i�� Phone +1 907 564-4035 Date 08/19/2015 Form 10-404 Revised 5/2015 Vii R/2/1 S ,at 9/271X-' Submit Original Only • • Daily Report of Well Operations PBU C-03C ACTIVITYDATE SUMMARY CTU 8 w/1.5" CT(CTV=23.4) Objective: Log Depth Control,Adperf Road Unit to C-pad. MIRU. Kill well with 230 bbls of slick 1% KCI and cap with 10 bbl of 50/50 methanol. RIH with PDS MGR/CCL in 2.20" carrier and 2.25" DJN drift. Tag TD @ 12473'. Log up @ 40 fpm to 9000', flagging CT @ 10600.2'. POOH. Good PDS data, -2 ft correction. PJSM. RIH with 30' Gun #1, Correct depth at flag. Perforate 10670-10700'. POH. At surface. No flow. Lay out BHA. All shots fired. RIH with #2. Perforate Interval 10637- 10667. POOH. ASF. 7/30/2015 ***Job in Progress Continued on WSR 07/31/15*** CTU 8 w/1.5" CT(CTV=23.4) Objective: Log Depth Control,Adperf ***Job Continued from WSR 07/30/15*** RIH with 30' Gun#3. Perforate Interval 10604- 10634. POOH. ASF. M/U Gun#4 BHA. PT lube. RIH to flag. Correct to top shot depth and perforate 10570-10600'. POH. ASF, M/U Gun#5. PT lube. RIH to flag. Correct to top shot depth. Perforate 10537-10567'. POH. Freeze protect tubing with 38 bbl 50/50 meth. Lay out gun 5, ASF. PJSM. Blowdown coil with N2. Rig down Coil 8. Secure well. Leave location. 7/31/2015 ***Job Complete*** Fluids Summary BBLS Type 397 SLICK 1% KCL 98 50/50 METH 495 Total • • o 0 0 0 CD CD co co 0 U O i 0 0 0 0 CO O O O c0 Ce) Ln CO N- CO a °o CO CO CO LO CO 03 LO CO O N N- CO Ln CC) In O) CO CO CO LO v- O CO Cr) LO N N N I- CO CO a) co CO I I I ! i II i F- M CO CO CO O) O) 00 N. Cfl CO N O Cn c- O N N O N- N N- Co CO O) CI) coL000OCOC.") ON M N (C) c- N- Ln CO CO Lo M O (.0 Ln N N V' N Cb 0) CS) OCN O) V U M CO M M p rnwN. oNI" LOOOoLO ro O N CO 0) 0 N C0 CS) (S) O) • a o °000CO °1 0? CCOC° U -J —1 O J 2-1 J J Z CO C CO N- O M It It' N� fn O O - • Or`i 0 0 " U _ W M N N N 0\0 CV N co ' i , .- °o O CA 4 M N t ' O V N N CO LO O CO CS) O LO I� CC) M C CO CO CO O — CO 10 O N 0 N V N CO M N O) J Z 0)O O N U U 0 Z O W W W W W W O D a Z Z Z Z Z Z D O (n CL J J J J J J H • • Packers and SSV's Attachment PBU C-03C SW Name Type MD TVD Depscription C-03C PACKER 8054 7215.79 7" Baker ZXP Top Packer C-03C PACKER 9205 8190.6 4-1/2" Baker S-3 Perm Packer C-03C PACKER 9250 8228.54 5" Baker ZXP Top Packer C-03C PACKER 9493 8438.3 5-1/2" Baker Flogard Patch C-03C PACKER 9495 8440.17 4-1/2" Baker KB LT Packer 4-1/16"CAN III CIW C-0 3 C ----Ay NOTES:WB_L ANGLE>70°@ 10181'. ACTUATOR- BAKER C INITIAL,"'A& B"WB_LBORES NOT SHOWN ON OKB.FIEV= 54.5' I weii re I DIAGRAM. --- • . . 1*.ELB1 • = 35.16' ------- 404 1. •4 I. KOP= 2700'130"CONDUCTOR H 80' 4. • Of 2039' —19-5/8"a camarrER •*1' 1. -Max Angle= 98'ig 12176' ,4. 1-1/4"TBG — 2026' / •' — 2064' —9-5/8"SEAL ASSY Datum MD= 9954' , ! 1 S Datum ! TVD= 8800'SS. ..Z 206 i 9 -13-5/ .FOC 38/8"X 9-5/8'BOT PIR/LNR FIGR 9-5/8"CSG,404,L-80 BTC,1)=8.835" — 2068' """ 2074' — .... I 11 2138' --113-3/8"FOC -- now H4-1/2"FES X NIP,I)=3.813" 18-5/8"CSG,96.5#,K-55,I)= 17.655' —1 2524' 2332' _—13-3/8"FOC 13-3/8'CSG,684,N-80 BTRS,H)= 12.415' —1 4331' — 4303' —9-5/8'FOC _ Minimum ID = 2.36" @ 9495' L is LFT MANDRELS ST kl) TVD DEV TYPE VLV LATCH FORT LATE 4-1/2" KB PACKER 4 '3308 3295 18 MG OO RK 16 09/30/12 l_ 9-5/8'X 7' BKR C2 ZXP LTP —1 8054' w4 3 6120 5599 36 IMAGM SO RK 20 09/30/12 2 8014 7182 31 MMGM DMY RK 0 11/13/05 w/TEBK SLV,ID=6.30" 1 9114 8114 33 KGB2 DMY BK 0 11/13/05 9-5/8'X 7"BKR HMC LNR HGR.I)=6.23" — 8071' W1PSTOCK(11/04/05) — 8202' 14,41OUT IAN•DOVV(C-038) 8202'-8215' 9-5/8'CSG,47#,N-80, ID=8.681' — —8202 'IS _ 9184' —4-1/2"HES X NP,ID=3.813" I S 0- 9205' —7'X 4-1/2"BKR PKR,E)=3.875' I 9228' —4-1/2"FES X NP,ID=3.813" I 9249' —4-1/2"I ICS XN NP,PILLED TO 3.80"(06/05/12) 9280' —7'x 5"BKR HF)ZXP LTP w/TEEIK SLV,ID=4.41' 4-1/2"TBG,12.6#,L-80 13T-M/TCI, 9261' ‘..'l by _0152 bpi, 17)=3.958' I I 9261' -H4-1/2"VVLEG,ID=3.9589" 7"LW,26#,L-80 BTC-M,.0383 bpf,D=6.276" H 9410' IA . . . . 9277 —Irx5-BKR I-NC LNR HGR,I)=4.42' 9279' —5"X 4-1/2"X0,D=3.960" 3-1/2"LNR 9.20#,L-ao STL, .0087 bpt,D=2.972" — 9555' — 9495' —4-1/2"BKR K8 PACKER,D=2.36'(07/14/14) 9503' H 3.70'GEN 2 DEPLOY SLV,ID=3.00' 9824' —13-1/2"OTE X NP,ID=2.813' BKR 45 KB FKR WHIPSTOCK(06/06/12) H 9610' I 9656' 1/2 = 4-1/2"LNR 12.6#.L-80 LTC,.0152 bpf,ID=3.958' H —9616 H3- "X 3-3/16"XO,I) 2.766 MILOUT WINDOVV(C-03C) 9616'-9621' PERFORATION SUMMARY REF LOG: SLB P&7'&ON 08/30/12 ANGLE AT TOP FEW 93° ..) 10537' 10503' —3-3/16"X 2-7/8'XO,ID=2.377 Mpte:Refer to Roduction DB for historical perf data i SIZE SPF INTERVAL Opn/Sqz DATE SEE PAGE 2 FOR PERFORA TON DATA I 1 1 I 1 I 3-1/4'LNR,6.60#,L-80 TCI,.0079 bpf,ID=2.85" — 10503' / I I PBTD —1 12475' I 2-7/8"LW,6,5#,L-80 STL,.0058 bpf, I)=2.441' .— 12513' LI DATE REV BY COMENTS DATE REV BY COP PRUDHOE BAY UNIT 03/26173 ? INITIAL COMPLETION 06/20/14 PANJIIAD SCHEMATIC CORRECTIONS WELL: C-03C 10/05/87 N1ES RWO 07/29/14 FH/JM)PULL/RESET KB PKR(07/14/14) FERMT No: '2120580 10/14/98 NORDIC C TD SIDETRACK(C-03A) 08/13/15,ATO/JK)ADFERFS(07/30-31/15) AR No: 50-029-20124-03 11115/05 ICES SIDETRACK(C-036) SEC 19,T11N,R14E, 1316'Rsl_8.879'FE_ 09/03/12 NORDIC 1 CTD SIDETRACK(C-03C) ' . 11/07/12 CRY/PJC MAL DRLG CORRECTIONS _ BP Exploration(Alaska) . 1111 C-03C 411 I •• • • •• • .4. •. •• • • •• • I I A I I PERFORATION SUlk..AA RY REF LOG: SLB RCN_ON 08/30/12 I I ANGLE AT TOP FEW 93 @ 10537' Mite:Refer to Production£8 for historical perf data I I SIZE SFF KOWA L Opn/Sqz Si-OT SQZ 7 6 10537- 10567 0 07/31/15 7 6 10570- 10600 0 07/31/15 7 6 10604- 10634 0 07/31/15 7 6 10637- 10667 0 07/30/15 2' 6 10670- 10700 0 07/30/15 7 6 10800- 11130 0 09/02/12 11.1 7 6 11210- 11570 0 09/02/12 7 6 11900-11950 0 09/02/12 7 6 12140- 12350 0 09/02/12 7 6 12400- 12470 0 09/02/12 1 • DATE REV BY COMENTS DATE REV BY COAMENTS PRUDHOE BAY UNIT 03/26(73 ? INITIAL COMPLETION 06/20/14 PM/JM) SCI-EMATC CORRECTIONS VVI3_L: C-03C 10/05/87 NIES MO 07/29/14 FM-VAC PULL/RESET KB PKR(07/14/14) FAT No:"2120580 10/14/98 NORDIC CTD SIDETRACK(C-03A) 08/13115 ATO/JM)ADPERFS(07/30-31/15) AF1 No: 50-029-20124-03 11/15/05 N2f35 SIDETRACK(C-03B) SEC 19,T11N,R14E,1316'Fikl_8 879'Fa 09/03112 NORDIC 1 C7E/SIDETRACK(C-03C) 111/07/12 CRY/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) • • 2't2 - c� 5� • ` •1* Date: 07/02/2013 Transmittal Number:93298 if► " BPXA WELL DATA TRANSMITTAL AOGCC: Makana Benders?./ r k Enclosed are the materials listed below. If you have any questions, please contact BreAnne Hovley: 907-564-5349 or breanne.hovley@bp.com 2190 Well Name Date Com an Color P Y Log Description Prints CD g1- 18(0 02-19 B11-11-2012 aker RESERVOIR PERFORMANCE MONITOR PNC 3D 1 1 I�� Baker C-03C 08-30-2012 Hughes RESERVOIR PERFORMANCE MONITOR PNC 3D 1 1 �t Baker C 7- a'$ H-22A 06-18-2013 Hughes RESERVOIR PERFORMANCE MONITOR PNC 3D 1 1 :cz,d 7){, Please Sign .'R:turn on cd of this py transmittal. Thank You, BreAnne 3fovley ; it- Petrotechnical Data Center Petrotechnical Data Center LR2-1 900 E.Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 Gam`, ' 43 t k, p a, q .:f^,.�j) Ira 111111d ;1.e_, ' J c:•.n J V BAKER PRINT DISTRIBUTION LIST o 6 2013 HUGHES COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME L-03 C RUN NUMBER 7---12...7 O^-5% (mandatory) 'LZ l7 ` I FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY Co FIELD FINAL (digitalADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF NHiN i S #OF COPIES #OF COPIES 11 4 4 4 4 4 U 1 BP Exploration(Alaska)Inc. I I 3 I 1 I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. i Anchorage,Alaska 99508 2 I 1ConocePhillips Alaska Inc. I I I 1 I I 1Attn Ricky Elgarico P0 Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska 1 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 1 I 1 I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5IDNR-Division of Oil&Gas I I I 1 1 I I IAttn:Sean Clifton 1550 W.7th Ave,Suite 800 (Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 Ire.tall - BAiEA P INT D STRII tUTION LASS "; 0 6 2013 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) `�^O�� WELL NAME C. O�C �� 1 RUN NUMBER `� (mandatory) 22`g";60 FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANYCD (FIELD FINAL digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OI F'HIN I S a#OF COPIES 4#OF COPIES n n LI" v V 1 BP Exploration(Alaska)Inc. 1 1 3 1 1 1 1 1 Petrotechnical Data Center LR2-1 j 900 E.Benson Blvd. Anchorage,Alaska 99508 2 1ConocePhillips Alaska Inc. 1 1 1 I L__ I iAttn Ricky Elgarico IPO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska 1 1 1 1 Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. ,I Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC 1 1 1 1 1 I 1 Christine Shartzer it 333 West 701 Ave,Suite 100 'Anchorage,Alaska 99501 4i 5 EDNR-Division of Oil&Gas 1 Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 bp Date 14-DEC-2012 Transmittal Number: 93270 tL IVED BPXA WELL DATA TRANSMITTAL DEC 14 2012 Enclosed are the materials listed below. AOGCC (BPXA FIELD LOG DATA) If you have any questions,please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: B-27B C-03C"1_1 c5 , 2 2 0 % 2Lx�9 C-03CPB1 1 C-09B Z\Z QG0122`6io C-09BPB 1 C-246 �l'Zp� t2-ZSSZ C-24BPB1 S-12B ��-2 �2- S-32A S-37A Z\Z O,2 S-37APB1 - Z-34 2—VZ---OG )2-2—'61 cS 1 ),,•• /37 Please Sign and Return`one copy of this transmittal. Thank You, Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 Letter of Transmittal FAWN EMMA/ED BAKERDate: October 2, 2012 o c r 12 2012 HUGHES A 170: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson t , ._ .- _ . Please find enclosed the directional survey data for the following well(s): C-09 BPB 1 C-0 ' C-03CPB 1 C-03C a � C-24BPB1 C-24B — B-27B �- 07-22A ( a5 S-37APB 1 S-37A ) c 7 - S-32A J 7, - - S-12B ;), ( C ( Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: -+"`i State of Alaska AOGCC _ DATE: 1 RECEIVED STATE OF ALASKA OCT 2 : 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOttO CC la. Well Status: ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class: 20AAC 25105 2OAAC 25110 0 Development 0 Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One 0 Service 0 Stratigraphic 2. Operator Name: 5.Date Comp,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 9/29/2012 - 212-058 • 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 8/18/2012 • 50-029-20124-03-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/27/2012 PBU C-03C` 1316' FNL,879' FEL, Sec. 19,T11N, R14E, UM • 8. KB(ft above MSL): 63.66' 15.Field/Pool(s): Top of Productive Horizon: 650'FSL,2143' FWL, Sec. 17,T11N, R14E, UM GL(ft above MSL): Prudhoe Bay/Prudhoe Bay • Total Depth 9.Plug Back Depth(MD+TVD): 473'FSL,4419' FWL, Sec. 17,T11N, R14E, UM 12475' 8936' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD)' 16. Property Designation: Surface: x- 664500 • y- 5959906 • Zone- ASP4 • 12515' 8934' • ADL 028305 • TPI: x- 667471 y- 5961938 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 669751 Si- 5961813 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): I (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 9616' 8558' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE ToP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED SEE ATTACHED 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom;Perforation Size and Number): 2"Gun Diameter,6 spf 4-1/2", 12.6#, L80 9261' 9205'/8191' MD ND MD ND 10800'-11130' 9006' 9000' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11210'-11570' 8996'-8987' . . 11900'-11950' 8994'-8992' '" `''` 2-::!:L-41.1 - DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 12140'-12350' 8971'-8947' 10 ' 12400'-12470' 8941'-8936' ' 1 r 2500' Freeze Protect w/40 Bbls Diesel . F � 'I 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): October 8, 2012 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF. WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 10/17/2012 12 Test Period ♦ 421 3556 8 176 Deg 8447 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF' WATER-BBL: OIL GRAVITY-API(CORR): Press. 700 1450 24-Hour Rate 4 842 7112 16 31.4 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No• Sidewall Core(s)Acquired? 0 Yes 0 No• If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RQDMS OCT 2§ 2012 Form 10-407 Revised 12/2009 SubmitOriginal Only CONTINUED ON REVERSE v��i�t ,� `' �/ 09 g t�l� 29. GEOLOGIC MARKERS(List all formations an ~larkers encountered): 30. FORMATION TESTS NAME ) ND Well Tested Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL/Zone 3 9690' 8631' None Zone 2C 9774' 8711' 23SB/Zone 2B 9840' 8770' 22TS 9907' 8827' 21 TS/Zone 2A 9962' 8870' Zone 1B 10094' 8955' TDF/Zone 1A 10182' 8993' Zone 1B(From Base) 12200' 8963' Formation at Total Depth (Name): Zone 1B(From Base) 12200' 8963' 31.List of Attachments: Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram,Surveys 32.I hereby certify that the- re oing is r e a r ct to the best of my knowledge. Signed: Joe Lastufka , Title: Drilling Technologist Date: 1071-41/2-- PBU C-03C 212-058 Prepared By Name/Number Joe Lastufka,564-4091 Well Number Permit No./Approval No. Drilling Engineer. Zech Sayers, 564-5790 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00) Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only WELL NAME: C-03C 23. Attachment-Casing, Liner and Cementing Record Casing Setting Depth MD Setting Depth TVD Hole Size Wt. Per Ft. Grade Top Bottom Top Bottom Size Cementing Record 20" Insulated Conductor Surface 80' Surface 80' 36" 484 sx Cement 18-5/8" 139#/109#/96 5# K-55 Surface 2524' Surface 2524' 24" 4700 sx Permafrost II 13-3/8" 72#/68# L-80/N-80 Surface 4331' Surface 4176' 17" 1210 sx Class'G', 950 sx PF II 9-5/8" 40#/47# L-80/N-80 Surface 8202' Surface 7342' 12-1/4" 4670 sx Class'G', 619 sx Class'G' 7" 26# L-80 8054' 9410' 7216' 8365' 8-1/2" 275 sx Class'G' 4-1/2" 12.6# L-80 9250' 9616' 8229' 8558' 6-1/8" 290 sx Class'G' 3-1/2"x 3-1/4" 9.2#/6.6# L-80 9495' 12513' 8440' 8935' 4-1/4" 166 sx Class'G' x 2-7/8" /6.5# TREE= 4-1/16"CNV VVFII.HEAD= CJWPJC DRAi 1" C-03C SAF. :.DOTES:WELL ANGLE>70°@ 10181'. ACTUATOR= BAKER C INITIAL,"A&B"WELLBORE'S NOT SHOWN ON KB.ELEV= 54.46' I .' F. I DIAGRAM. BF_ELEV= 35.16' •4 11 KOP= 2700' +.• !ii 2039' --I9-518"la CB+AENTE I Max Angle= 98 @ 12176' 20"CSG 80' %� 0 2054' -I9-5/8"SEAL ASSY I Datum MD= 9954' %. 1 Datum TVD= 8800'SS :I ® 2059' H 13-3/8"X 9-5/8"BOT PKR/LNR HGR 1-1/2"TBG —I 1814' / 2074' —19-5/8"FOC 9-5/8"CSG,40#,L-80 BTC,D=8.835' H 2068' �" 2138' —113-3/8"FOC 18-5/8"CSG,96.5#,K-55,D=17.655' —I 2524' a '� 2206' 4 1/2"HFS X NII?,D=3.813" 1 2332' —I13-3/8"FOC 13-3/8"CSG,72#,L-80,0=12.347" —I 4331' I 4303' j-19-5/8"FOC I GAS LFT MANDRELS Minimum ID =2.3.77" @ 10503' k ST MD TVD DEV TYPE VLV LATCH FORT DATE 3-3116" X 2-718" LNR XO 1., 4 3308 3295 18 NAG DOME RK 16 09130/12 3 6120 5599 36 MMGM SO RK 20 09/30/12 9 5/8"X 7" BKR G2 ZXP LTP 8054' 2 8014 7182 31 MMGM DMY RK 0 11/13/05 IS w/TK SLV,0=6.30' TO 1 9114 8114 33 KGB2 DMY BK 0 11/13/05 9-5/8"X 7"BKR HMC LNR HGR,ID=6.23" H 8071' VVI-DESTOCK(11/04/05) — $202' MLLOUT WIVDOW(C-03B) 8202'-8215' 9-5/8"CSG,47#,N-80,D=8.681" I— —8202 - 9184' —14-112"HES X NP,D=3.813" +I X 9205' H 7"X 4-1/2"BKR PKR,D=3_875" ' 9228' --I4-1/2'I-ES X NIP,ID=3.813" I 9249' H4-1/2"HES XN NP,MLLE)TO 3.80"(06/05/12) 4-1/2"TBG,12.6#,L-80 137 M/TC1 9261' 9250' —17"x 5"BKR HRD ZXP LTPw/TLBK SLV,D=4.41" .0152 bpf,D=3.958" 19261' —14-1/2"WLEG,D=3.9589' 7"LNR,26#,L-80 BTC-M,.0383 bpf,D=6.276" —I 9410' IJ9272' 7"X 5"BKR HMC LNRHGRD=4.42" 9279' —I5"X 4-1/2"XO,D=3.960" I.r 3-1/2"LNR 9.20#,L 80 STL,.0087 bpt,D=2.972" 9555' I---r... 9495' H4-1/2"BKR KB PACKER,D=2.36'(09/2912) 9503' H 3.70"GEN 2 DEPLOY SLV,D=3A BKR 45 KB FKR WHIPSTOCK(06/06/12) 9610' 9524' —I3-1/2"OTIS NP,D=2.813" 4-1/2"LNR 12.6#,L-80 LTC,.0152 bpf,D=3:958' —I —9616 I 9555' 1-13-1/2"X 3 3/16"XO,D=2.786 PERFORATION StAAV1ARY MLLOUT WINDOW(C-03C) 9616'-9621' REE LOG: ?????ON??/??/?? ANGLE AT TOP PERF: 89'@ 10800' Note:Refer to Production DB for historical perf data 10503' IH 3-3/1T X 2-7/8"XO,D=2.377 SIZE SW INTERVAL Opn/Sqz DATE SEE PAGE 2 FOR PERFORATON DATA I I I I 3-1/4"LNR,6.60#,L-80 TCI,.0079 bpf,ID=2.85" — 10503' PBTD H 12475' 2-7/8"LNR,6.5#,L-80 SIL,.0058 bpf,D=2.441" H 12513' DATE REV BY COMMENTS DATE REV BY COMMENTSI PRUDFOE BAY UNIT 03126/73 ? INITIAL COMPLETION 09/16/12 PJC DRLG DRAFT CORRECTIONS WD_L: C-03C 10/05/87 NIES RWO 09/30/12 MSS/PJC SET LTPY GLV C/O(09/29/12) PERMIT No:'2120580 10/14/98 NORDIC CTD SIDETRACK(C-03A) API No: 50-029-20124-03 11/15105 N2ES SIDETRACK(C-03B) SEC 19,T11 N,R14E, 1316'FNL&879'FEL 09/03/12 NORDIC 1 CTD SIDETRACK(C-03B) 09/05/12 PJC DRLG HO CORRECTIONS BP Exploration(Alaska) i C-03C i, AA i i�• �1 i'; 4 i • r Err ii Mr M N 1 1 ,_. 1 L L 1 1 1 1 I 1 k # . r PERFORATION SLMTAARY RIE=LOG: ?????ON??/??/?? ANGLE AT TOP FERE- 89'@ 10800' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 10800-11130 0 09/02/12 2' 6 11210-11570 0 09/02/12 2" 6 11900-11950 0 09/02/12 2" 6 12140-12350 0 09/02/12 2' 6 12400-12470 0 09/02/12 FATE REV BY COI ENTS DATE REV BY COMMIBNTS FRAHOE BAY INUIT 03/26/73 ? INTIM.COMPLETION 09/16/12 PJC DRLG DRAFT CORRECTIONS VVB_L C-03C 10/05/87 NI ES RWO 09/30/12 MSS/PJC SET LTR GLV GO(09/29/12) PERMT Na:'2120580 10/14/98 NORDIC CTO SIDETRACK(C-03A) API No: 50-029-20124-03 11/15/05 N2 ES SIDETRACK(C-03B) SEC 19,T11N,R14E, 1316'RI_&879'F)3 09/03/12 NORDIC 1 CTDSIDETRACK(C-03B) I09/05/12 PJC DRLG HO CORRECTIONS BP Exploration(Alaska) North America-ALASKA- BP Page 1 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.27.5"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/16/2012 04:00 - 05:00 1.00 MOB P PRE MOVE RIG TO C-03. DOUBLE CHECK OA PRESSURE(20PSI)- BLEED DOWN. 05:00 - 06:30 1.50 MOB P PRE MOVE RIG OVER WELL C-03. RIG ACCEPTED AT 05:30AM. 06:30 - 08:30 2.00 BOPSUR P PRE PJSM.RIG UP TO TEST FOR REMOVING TREE CAP.CLOSE MASTER,SSV AND SWAB VALVE.TEST SWAB THROUGH WING VALVE TO 250 PSI LOW AND 3500 PSI HIGH FOR A LEAK TIGHT TEST, BLEED OFF PRESSURE AND OBSERVE NO LEAKS PAST SSV-PASS. 08:30 - 09:00 0.50 BOPSUR P PRE PJSM.RIG UP IA AND OA CRASH CAGES. 09:00 - 12:00 3.00 BOPSUR P PRE PJSM.NIPPLE UP BOP. 12:00 - 14:00 2.00 BOPSUR P PRE PJSM.RIG UP GREASE CREW AND GREASE CHOKE MANIFOLD AND STACK FOR BOP TESTING. 14:00 - 00:00 10.00 BOPSUR P PRE PJSM.TEST BOP TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH.TEST 2-3/8-IN COMBIS WITH 2-3/8-IN TEST JOINT. TEST 2-3/8"X 3-1/2"VARIABLES WITH 2-3/8" AND 3-1/4"TEST JOINTS.TEST ANNULAR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH WITH 2-3/8"TEST JOINT. PERFORM ACCUMULATOR DRAWDOWN TEST.NOTE STARTING ACCUMULATOR PRESSURE AS 3,100 PSI AND THE FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR=2,200 PSI.SYSTEM TOOK 20SEC TO BUILD 200 PSI AND 91SEC TO FULL PRESSURE.CHECKED THAT NITROGEN BACKUP BOTTLES HOLD 2,000 PSI. TEST WITNESS WAS WAIVED BY JEFF v� JONES WITH AOGCC.TEST WITNESSED BY J WSL'S MITCH SKINNER AND MATTHIAS ,L,1`( KOENIG AND TOOLPUSHERS TOMMY U" KILFOYLE AND DAVE HILER. AT18:00hrs-IA=OPSI/OA= 168PSI/OOA= OPSI AT 00:00hrs-IA=OPSI/OA=173PSI/OOA= OPSI 8/17/2012 00:00 - 01:30 1.50 BOPSUR P PRE CONTINUE BOP-TEST. 01:30 - 03:30 2.00 BOPSUR P PRE TAKE OFF NIGHT CAP AND PICK UP INJECTOR.TEST METHANE AND H2S ALARMS. MU SLB CTC,PULLTEST TO 35K LBS AND PRESSURE-TEST TO 300/5MINS AND 3,500PSI5/MINS.CTC IS LEAKING,TAKE OFF AND MU NEW CTC.ACHIEVE GOOD TEST AND BLEED DOWN. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 2 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date X3-0124X-C: (3,127,117.95) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:30 1.00 BOPSUR P PRE STAB ON INJECTOR AND FLUID PACK REEL& LUBRICATOR. AT 04:00hrs-IA=OPSI/OA= 172PSI/OOA= OPSI 04:30 - 05:00 0.50 BOPSUR P PRE PERFORM PRESSURE-TEST ON INNER REEL VALVE,QTS AND PACK-OFF'S. 05:00 - 05:20 0.33 BOPSUR P PRE 'HOLD RIG EVACUATION ALARM. 05:20 - 06:30 1.17 BOPSUR P PRE PUMP SLACK FORWARD WITH 55BBLS.POP OFF LUBRICATOR AND EXPOSE 12'E-LINE CABLE.RIG DOWN AND PREP FOR BOP RAM LOCK TEST. 06:30 - 08:00 1.50 BOPSUR P PRE INSTALL NOZZLE ASSEMBLY.STAB ON WELL AND BREAK CIRCULATION. 08:00 - 10:30 2.50 BOPSUR P PRE HOLD PJSM.TEST MANUAL LOCK DOWNS ON BOP RAMS. FOR EACH RAM,CLOSE RAM, • RUN IN LOCKS,CLOSE ACCUMULATOR, BLEED OFF HYDRAULIC PRESSURE THEN • PRESSURE TEST FROM BELOW.BLEED OFF PRESSURE, BACK OUT LOCKS THEN OPEN RAMS.TEST TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH.TEST IN ORDER,LOWER 2-3/8"COMBI,LOWER 2-3/8"X 3-1/2"VARIABLES AND UPPER 2-3/8" COMBI WITH 2-3/8"COIL. PULL COIL AND TEST BLIND SHEAR RAMS.ALL TESTS PASSED. 10:30 - 11:00 0.50 BOPSUR P WEXIT INSTALL TREE CAP AND PRESSURE TEST. 11:00 - 11:30 0.50 BOPSUR P WEXIT HOLD EVAC DRILL AND AAR. HOLD PRE-SPUD MEETING AFTER AAR. 11:30 - 13:00 1.50 STWHIP P WEXIT PJSM.RIG UP THEN HEAD UP COIL. TEST-PASS. 13:00 - 13:30 0.50 STWHIP P WEXIT PJSM.TEST CHECKS ON COIL HEAD-PASS. 13:30 - 14:30 1.00 STWHIP P WEXIT PJSM.PICK UP BHA TOOLS.MAKE UP DIAMOND WHIPSTOCK MILL AND DIAMOND -STRING MILL TO STRAIGHT MOTOR, PH-6 AND COILTRAK TO 120'. 14:30 - 15:00 0.50 STWHIP P WEXIT MAKE UP INJECTOR AND TEST QUICK TEST SUB TO 250 PSI LOW,3500 PSI HIGH-PASS. 15:00 - 17:30 2.50 STWHIP P WEXIT RIH AT 93 FEET PER MINUTE PUMPING AT 1.5 BARRELS PER MINUTE WITH 1018 PSI TO 9,460'MD.DISPLACE DIESEL FREEZE PROTECT FROM THE WELL ON THE FLY. 17:30 - 18:30 1.00 STWHIP P WEXIT DISPLACE KCL WITH 8.5 PPG MILLING FLUID WHILE LOGGING TIE-IN TO TOP OF WHIPSTOCK SLIDE AT 9,610'MD.TAG UP ON TOP OF WHIPSTOCK SLIDE AT 9,617'MD. CORRECTION OF MINUS 2 FEET. 18:30 - 20:00 1.50 STWHIP P WEXIT •START MILLING THE WINDOW ONWARDS • FROM 9,616.4'.TIME MILL WINDOW FOR FIRST FOOT AT 2.58 BPM WITH—2,800PSI CIRC PRESSURE AND—0.5K LBS WOB. 20:00 - 20:20 0.33 STWHIP P WEXIT GRADUALLY INCREASE TO—2.5K LBS WOB. SEE STALL AT 9617.9'AT 2.85K LBS WOB / 2,816PSI CIRC PRESSURE. PICK UP AND TAKE SPR'S. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP • Page 3 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date. X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:20 - 21:45 1.42 STWHIP P WEXIT PICK UP AND REVERT BACK TO TIME-MILLING TO ESTABISH MILLING PATTERN AGAIN AT PUMP RATE OF 2.56BPM AND 2.8K LBS WOB/2,770-2,820PS1 CIRC PRESSURE. 21:45 - 00:00 2.25 STWHIP P WEXIT CONTINUE TIME MILLING WINDOW. OBSERVE STEADY INCREASE IN WOB UP TO 2.96K LBS(CIRC PRESSURE=2,850PSI) FOLLOWED BY A STEADY DECLINE IN WOB, THUS INDICATING THE WINDOW MILL"MID POINT". 8/18/2012 00:00 - 00:40 0.67 STWHIP P WEXIT WOB DECREASES AND LEVELS OUT AROUND 1.56K LBS/2,740PSI CIRC PRESSURE,WHICH INDICATES WINDOW ✓ MILL"EXIT POINT'. 00:40 - 01:20 0.67 STWHIP P WEXIT CONTINUE MILLING AHEAD AT SIMILAR WOB. 01:20 - 02:55 1.58 STWHIP P WEXIT OBSERVE AN INCREASE IN WOB ONWARDS FROM 9,620.5'INDICATING THE STRING REAMER ENTERING THE WINDOW. CONTINUE TIME MILLING WITH INCREASING WOB UP TO 2.32K LBS/2,830PSI CIRC .PRESSURE,FOLLOWED BY A DECLINE DOWN TO 1.8K LBS WOB/2,800PSI CIRC PRESSURE AGAIN(EXIT OF STRING REAMER). 02:55 - 08:30 5.58 STWHIP P WEXIT START DRILLING 10'RATHOLE. Z,`UNTINUE DRILLING AHEAD WITH ROP= —1-5 FPH,WOB=3-4K LBS AND CIRC PRESSURE=—3,000 PSI AT 2.62 BPM.PVT= 300 BBLS. MW IN=8.62 PPG / MW OUT=8.59 PPG / ECD=10.15 PPG IAP=740 PSI / OAP=355 PSI / OOA=65 PSI BACKREAM WINDOW 3 TIMES WITH SLIGHT MOTOR WORK ON FIRST RUN THEN DECREASING.DRY DRIFT WINDOW AFTER THIRD TIME WITH NO WEIGHT ON INDICATOR GOING THROUGH OR OVER PULL COMING UP.WINDOW APPEARS TO BE IN GOOD CONDITION. 08:30 - 09:00 0.50 STWHIP P WEXIT FLOW CHECK WELL FOR 10 MINUTES- STATIC.PULL UP INTO WINDOW. UP WEIGHT 36K,DOWN WEIGHT 17K.OPEN EDC. 09:00 - 10:30 1.50 STWHIP P WEXIT POOH AT 98 FPM TO BHA AT 192'MD.PUMP AT 2.6 BPM WITH 2200 PSI.MUD WEIGHT IN AND OUT 8.6 PPG.UP WEIGHT 29K. 10:30 - 11:30 1.00 STWHIP P WEXIT PJSM. FLOW CHECK WELL FOR 10 MINUTES- STATIC.LAY DOWN MILLING BHA FROM 192' MD.WINDOW MILL 3.78"NO-GO.STRING MILL 3.75"NO-GO. 11:30 - 12:30 1.00 STWHIP P WEXIT MAKE UP DRILLING BHA WITH 4-1/4" SRH3211M-C3 BI-CENTER BIT,3-1/8"LOW SPEED MOTOR WITH MWD TOOLS AND RIH TO 86'MD. Printed 9/18/2012 8:41:22AM North America ALASKA- BP • Page 4 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/13/1973 12:00:OOAM Rig Release: 9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING©54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:30 - 14:30 2.00 STWHIP P WEXIT MAKE UP INJECTOR AND TEST QUICK TEST SUB TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS.RIH AT 93 FPM PUMPING AT.55 BPM WITH 1010 PSI. AT 7,100 MD RUN AT 91 FPM PUMPING AT.53 BPM WITH 1200 PSI.MUD WEIGHT IN AND OUT 8.6 PPG. IA=95 PSI,OA=360 PSI,OOA 5 PSI.RIH TO 9,570'MD AND BEGIN TIE-IN. 14:30 - 15:30 1.00 STWHIP P WEXIT LOG FROM 9,570'MD TO TOP OF WHIPSTOCK AT 9,616'MD FOR TIE-IN THEN CONTINUE LOGGING TO BOTTOM.RUN AT 2.0 FPM PUMPING AT.55 BPM WITH 1260 PSI.MUD WEIGHT IN AND OUT 8.6 PPG.APPLY MINUS 2.5'CORRECTION. 15:30 - 18:00 2.50 DRILL P PROD1 DIRECTIONAL DRILL AHEAD TO 9,756'MD, 8,628'ND.PUMP AT 2.5 BPM WITH 2875 PSI. FREE SPIN 2600 PSI.WOB 1 K-2K,DOWN WEIGHT 11K.ROP 33-68 FPM.ECD 10.0 PPG EMW.MUD WEIGHT IN AND OUT 8.6 PPG.PIT VOLUME 305 BBLS.IA=398 PSI,OA=369 PSI, OOA=51 PSI. 18:00 - 19:00 1.00 DRILL P PROD1 CONTINUE DRILLING AHEAD WITH ROP=55 -FPH,WOB=3.38K LBS AND CIRC PRESSURE =2,992 PSI AT 2.51 BPM. PVT=288 BBLS / MW IN=8.62 PPG / MW OUT=8.61 PPG / ECD=10.07 PPG IAP=459 PSI / OAP=372 PSI / OOA=168 PSI. 19:00 - 19:30 0.50 DRILL P PROD1 PERFORM FIRST 150'WIPER TRIP BACK TO WINDOW. 19:30 - 20:45 1.25 DRILL P PROD1 TAKE SPR'S AND CONTINUE DRILLING AHEAD,HOWEVER STUGGLE TO ACHIEVE ANY BUILD ABOVE 9-10DEG. INCREASE WOB IN ATTEMPT TO START BUILD. ROP=85 FPH,WOB=6.44K LBS AND CIRC PRESSURE=3,611 PSI AT 2.662 BPM. PVT=302 BBLS / MW IN=8.64 PPG / MW OUT=8.67 PPG / ECD=10.08 PPG. 20:45 - 21:50 1.08 DRILL P PROD1 PICK UP TO PERFORM CHECKSHOTS FOR DIRECTIONAL SURVEYS. 21:50 - 22:30 0.67 DRILL P PROD1 BACK TO BOTTOM AND CONTINUE DRILLING AT ROP=74FT/HR / 4.36K LBS WOB / 3,307PSI CIRC PRESSURE AT 2.6BPM. 22:30 - 00:00 1.50 DRILL P PROD1 DECIDE TO POOH.WITH THE CURRENT BENT IT IS HIGHLY QUESTIONABLE IF THE WELL CAN BE LANDED ON DEPTH,THUS PULL FOR MOTOR WITH HIGHER AKO. 8/19/2012 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUE POOH TO PICK UP MOTOR WITH DIFFERENT BENT. BLEED DOWN OOA FROM-500PSI DOWN TO 95PS1. 01:00 - 01:15 0.25 DRILL P PROD1 FLOW-CHECK WELL FOR 5 MINS;WELL IS STATIC. HOLD PJSM BEFORE LAYING DOWN BHA#2. 01:15 - 01:45 0.50 DRILL P PROD1 LAY DOWN BHA#2 AND MAKE UP BHA#3- INSTALL 2-7/8"HS MOTOR WITH 1.35 AKO AND MAKE UP 4-1/4"HYC-BIT WITH HELIOS-CUTTERS. 01:45 - 02:25 0.67 DRILL P PROD1 STAB ON INJECTOR AND PRESSURE-TEST QTS. Printed 9/18/2012 8:41:22AM North America-ALASKA- BP Page 5 of 21 Operation Summary Report Common Well Name: C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release: 9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Let:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING©54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:25 - 04:15 1.83 DRILL P PROD1 RIH WITH BHA#3. IA=206PSI / OA=376PSI / OOA=81 PSI 04:15 - 04:30 0.25 DRILL P PROD1 SLOW DOWN AND PERFORM TIE-IN LOG. APPLY-1.5FT DEPTH CORRECTION. 04:30 - 04:45 0.25 DRILL P PROD1 CONTINUE RIH TAKING SOW PUMP RATES AT 9,800'. 04:45 - 05:30 0.75 DRILL P PROD1 DRILL AHEAD FROM 9,915'TO 9,925'TRYING YO TAKE FURTHER SURVEY. IMMEDIATELY NOTICE INCREASE IN XY-VIBRATION TO"4"(WAS"0"WITH 3-1/8" MOTOR)., 05:30 - 06:20 0.83 DRILL P PROD1 DRILLING AHEAD AT 30FT/HR WITH 1.5-2.0K LBS WOB. STRUGGLE TO ACHIEVE QUALITY SURVEYS- APPEARS THAT SOLAR ACTIVITY IS INTERFERING WITH TOOLS. CHEKC MWD-TOOLS,TOOLS ARE WORKING OKAY. 06:20 - 06:40 0.33 DRILL P PROD1 STOP DRILLING AHEAD TO 9948'DUE TO DIFFICULTIES WITH TAKING SURVEYS- - CANNOT DRILL AHEAD WITHOUT PROPER SURVEYS AND LAST SURVEY WAS TAKEN .9,850'. TRY TAKING SURVEYS AT DIFFERENT DEPTHS, RATES AND DIRECTIONS,ALSO WITH PUMPS OFF, HOWEVER CANNOT GET ANY SURVEY-SHOTS WHICH WOULD PASS THE QUALITY-CHECKS. DECIDE TO PULL UP TO WINDOW AND WAIT FOR MAGNETIC STORM TO CEASE. SPACE WEATHER FORECAST GIVES MAGNETIC DISTURBANCE WARNING UNTIL AFTERNOON.... 06:40 - 08:00 1.33 DRILL N DPRB 9,948.00 PROD1 PULL INTO WINDOW TO 9,600'AND OPEN EDC. PVT=290BBLS / IA=461 PSI / OA=376PSI / OOA= 18PSI. 08:00 - 09:00 1.00 DRILL N DPRB 9,948.00 PROD1 RIH TO CHECK SURVEYS. RE-SHOOT SURVEYS AT 9,821'AND 9,850', BOTH CLEAN SURVEYS. SHOOT SURVEYS AT 9,880'AND 9,901'WITH BOTH BEING CLEAN SURVEYS. 09:00 - 12:00 3.00 DRILL N HMAN PROD1 RUN TO BOTTOM AND DRILL AHEAD TO 10,035'MD. PUMPING AT 2.6 BPM WITH 2800 TO 2930 PSI, FREE SPIN 2600 TO 2800 PSI. DOWN WEIGHT 13K WITH WOB 0.5 TO 2K AT 25-40 FPH. ECD 9.3 PPG EMW. MUD WEIGHT IN AND OUT 8.6 PPG.IA=580 PSI,OA=380 PSI,00A=145 PSI. 12:00 - 15:00 3.00 DRILL N HMAN PROD1 DRILL AHEAD TO 10,102'MD. PUMPING AT 2.6 BPM WITH 2910 TO 2930 PSI, FREE SPIN 2700 TO 2800 PSI. DOWN WEIGHT 13 7K WITH WOB 0.5 TO 2K AT 24-30 FPH. ECD 9.3 PPG EMW. MUD WEIGHT IN AND OUT 8.6 PPG. IA= 300 PSI.OA=360 PSI.OOA=84 PSI. CONTINUE TO MONITOR ANNULI AND BLEED OFF AS NECESSARY. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 6 of 21 Operation Summary Report 4i. ', .iiiiiiikiNialitiatiiiiiiiiii, Common Well Name:C-03 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C:(3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No: NORDIC 1 Spud Date/Time:2/13/1973 12.00:00AM Rig Release: 9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat.070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 18:30 3.50 DRILL N HMAN PROD1 DRILL AHEAD TO 10,200'MD.PUMPING AT 2.6 BPM WITH 2910 TO 3300 PSI, FREE SPIN 2800 TO 3100PSI DOWN WEIGHT 6K TO 13 7K WITH WOB 0.5 TO 4K AT 24 TO 40 FPH ECD 9.3 PPG EMW MUD WEIGHT IN AND OUT 8 6 PPG IA=402 PSI.OA=363 PSI.OOA=293 -PSI. CONTINUE TO MONITOR ANNULI AND BLEED OFF AS NECESSARY. DRILLING AHEAD THROUGH THE 13N SHALE AND INTO ZONE 1A. 18:30 - 19:25 0.92 DRILL N HMAN PROD1 PERFORM 3RD 150FT WIPER TRIP BACK TO WINDOW.TIE-IN TO RA-TAG AND APPLY+3FT DEPTH-SHIFT. 19:25 - 23:00 3.58 DRILL N HMAN PROD1 OBTAIN SPR'S AND DRILL AHEAD FROM 10,225' SEE ROP'S AROUND 30FT/HR WITH 3,000PSI-3,500PSI CIRC PRESSURE AT —2.5BPM. DIFFICULT DRILLING AT MAX WOB OF 4.70K LBS. 23:00 - 00:00 1.00 DRILL N HMAN PROD1 NOTICE INCREASING WEIGHT TRANSFER-ISSUES.ACHIEVE ACCEPTABLE ROP'S WHEN APPLYING MAX WOB, HOWEVER AT THE SAME TIME ALSO SEE MORE STALLS. HAVE ACHIEVED TAREGET DEPTH OF 8,962'TVD AND WORKING ON LANDING THE WELL/DRILLING THE HEEL-SECTION. 8/20/2012 00:00 - 00:30 0.50 DRILL P PROD1 DRILL AHEAD FROM 10,330'.NOTICE SPORADIC ROP'S OF 130FT/HR BUT PREDOMINANTLEY SEE POOR DRILLING PROGRESS. PVT=268BBLS / IA=278PSI / OA=347PSI / OOA=322PSI 00:30 - 01:15 0.75 DRILL P PROD1 PUMP 4OBBLS NEW 8.55PPG MUD OFF TRUCK INTO COIL AND PUMP AWAY AT 2.5BPM.DO NOT NOTICE A VAST IMPROVEMENT IN DRILLING AS NEW MUD COMES OUT OF BIT. PVT=307BBLS / IA=260PSI / OA=347PSI / OOA=348PSI 01:15 - 01.30 0.25 DRILL P PROD1 ACHIEVE 90DEG INCLINATION WHICH COMPLETES THE'BUILD'-SECTION ON THE WELL. WITH THE 4OBBLS OF NEW MUD BEING OUT OF THE COIL, PERFORM WIPER TRIP UP TO THE WINDOW TO CHASE OUT PILL. 01:30 - 02:00 0.50 DRILL P PROD1 GEO INFORMS THAT MHO HAS COME IN HIGHER THAN EXPECTED(SAMPLES SHOW A BLACK, DENSE,STICKY TAR)AND ASKS DD TO STEER UP TO MINIMUM ABOVE 8,950'TVD (CURRENTLY AT 8,965'). 02:00 - 02:45 0.75 DRILL P PROD1 PICK UP FROM 10,349', PULL UP INTO THE WINDOW AND OPEN EDC. PERFORM KICK WHILE TRIPPING DRILL- GREAT RESPONSE BY ALL CREW, EVERY MAN WAS ON HIS POST AND KNEW HIS TASKS AND DUTIES.HELD AAR. 02:45 - 03:30 0.75 DRILL P PROD1 CLOSE EDC AND RUN BACK IN HOLE. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 7 of 21 Operation Summary Report Common Well Name: C-03 •AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:30 1.00 DRILL N HMAN PROD1 DRILL AHEAD FROM 10,349'WITH TOOLFACE AT-350DEG.ROP=15FPH,WOB=4.75K LBS AND CIRC PRESSURE=3,380 PSI AT 2.62 BPM(FREE SPIN=2,880 PSI AT 2.62 BPM). PVT=309 BBLS(NO LOSSES). MW IN=8.68 PPG / MW OUT=8.65 PPG / --ECD=10.13 PPG / IA=227 PSI / OA=345 PSI / OOA=330 PSI 04:30 - 05:30 1.00 DRILL N HMAN PROD1 CTDS DRILLER HAS NOW ESTABLISHED A STEADY DRILLING PROGRESS AROUND 10- 15FT/HR BUT WITHOUT STALLS AND PICK-UPS. 05:30 - 08:00 2.50 DRILL N HMAN PROD1 DRILLING'AHEAD IN ZONE 1A TRYING TO REACH UP THROUGH THE 12N SHALES TO FIND THE SAND PAY. DRILLING AT 2.6 BPM WITH 3270 PSI AND 3100 FREE SPIN.WOB 1 TO 2K AND 5K DOWN WEIGHT.ROP AT 25 FPH WITH AN ECD OF 10.14 PPG.MUD WEIGHT IN AND OUT 8.7 PPG.IA=305 PSI, OA=345 PSI,OOA=70 PSI. 08:00 - 12:30 4.50 DRILL N HMAN PROM STILL WORKING UP THROUGH THE ZONE 1 TO FIND PAY SAND TO CALCULATE DIP FOR POSSIBLE BILLET RUN AND SIDETRACK OUT OF THE SHALES. DRILLING AT 2.6 BPM WITH 3200 PSI, FREE SPIN 3050 PSI.WOB 1-3K WITH 8K DOWN WEIGHT.ROP AT 49 FPH WITH AND ECD OF 10.24. MUD WEIGHT IN AND OUT 8.7 PPG. IA=395 PSI,OA=345 PSI, OOA=240 PSI. 12:30 - 14:00 1.50 DRILL N HMAN PROD1 PERFORM WIPER TRIP TO WINDOW PUMPING AT.88 BPH WITH 1575 PSI. PULL AT 39 FPM.UP WEIGHT 35K,DOWN WEIGHT 13K. 14:00 - 17:30 3.50 DRILL N HMAN PROD1 DRILLING AHEAD IN ZONE 1 PAY SANDS TO 8,940'TVD TO ESTABLISH DRILLING LIMITS FOR SIDETRACK.DRILLING AT 2.7 BPM WITH 3900 PSI.WOB 1-3K.ROP AT 132 FPH WITH AN ECD OF 10.36 PPG.MUD WEIGHT IN AND OUT 8.7 PPG.IA=440 PSI,OA=345 PSI,OAA =360 PSI. 17:30 - 19:30 2.00 DRILL N HMAN PROD1 PERFORM 3RD 150ft-WIPER TRIP TO WINDOW PULLING AT 14 FPM.PUMP AT 2.7 BPM WITH 3050 PSI.UP WEIGHT 35K.MUD WEIGHT IN AND OUT 8.8 PPG. NOTICE'TIGHT"SPOT WITH OVERPULL AROUND 10,260FT. 19:30 - 20:00 0.50 DRILL N HMAN PROD1 PERFORM TIE-IN TO RA-TAG.CORRELATE AND APPLY+6FT DEPTH CORRECTION. RUN BACK IN HOLE. 20:00 - 20:25 0.42 DRILL N HMAN PROD1 SIT DOWN AND STACK WEIGHT AT 10,290' (TOP OF 12N-SHALE).MANAGE TO PROGRESS AND WORK WAY THROUGH BY CHANGING TOOLFACE. 20:25 - 20:40 0.25 DRILL N HMAN PROD1 TAKE SLOW PUMP RATES AND CONTINUE DRILLING. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page ; ., 2 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad • Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:40 - 22:00 1.33 DRILL N HMAN PROD1 CONTINUE DRILLING AHEAD WITH ROP=78 FPH,WOB=3.14K LBS AND CIRC PRESSURE =3,520 PSI AT 2.56 BPM(FREE SPIN=2,856 PSI AT 2.60 BPM).GOOD DRILLING IN ZONE#1 /13P-SAND. PVT=285 BBLS(NO LOSSES) / MW IN=8.77 -.PPG / MW OUT=8.75 PPG / ECD=10.33 PPG IAP=371 PSI / OAP=348 PSI / OOA=157 PSI 22:00 - 00:00 2.00 DRILL N HMAN PROD1 OBSERVE A DROP IN ROP DOWN FIRST TO 45FT/HR AND THEN 35FT/HR-DRILLBIT HAS ENTERED THE 13N-SHALE.CONTINUE DRILLING AHEAD IN ORDER TO LOG 13N-SHALE. 8/21/2012 00:00 - 00:15 0.25 DRILL N HMAN PROD1 DRILL TO 10,758'AND AGREE WITH GEO THAT PURPOSE OF SURVEYING TARGET-ZONE(I.E. 13P-SAND)HAS BEEN COMPLETED.DECIDE TO POOH. 00:15 - 01:15 1.00 DRILL N HMAN PROD1 COMMENCE POOH. 01:15 - 01:30 0.25 DRILL N HMAN PRODt PULL INTO WINDOW.FLOW-CHECK WELL (WELL IS STATIC)AND OPEN EDC. 01:30 - 03:15 1.75 DRILL N HMAN PROD1 CONTINUE POOH. 03:15 - 03:30 0.25 DRILL' N HMAN PROD1 PULL TO SURFACE AND FLOW-CHECK WELL -WELL IS STATIC.HOLD PJSM BEFORE LAYING DOWN TOOLS. 03:30 - 04:00 0.50 DRILL N HMAN • PROD1 POP OFF INJECTOR,STAND BACK TO SIDE AND LAY DOWN BHA#3. 04:00 - 05:00 1.00 DRILL N HMAN PROD1 MU BHA#4 WITH 3-5/8"OH ANCHOR AND ALUMINUM BILLET AND BAKER#10 J HYDRAULIC SETTING TOOL.STAB ON INJECTOR AND PRESSURE-TEST QTS TO 300PSI/5MINS AND 3500P51/5MINS. 05:00 - 07:30 2.50 DRILL N HMAN PROD1 RIH WITH BHA#4. PVT=220 / IA=OPSI / OA=338PSI / OOA= 59PSI. 07:30 - 08:00 0.50 DRILL N HMAN PROD1 LOG TIE IN TO MINUS 3 FEET CORRECTION. RUN IN HOLE TO DEPTH AT 10,011'MD.PICK UP TO BREAK OVER WEIGHT AT 40K.PARK BILLET ON DEPTH FOR TOP AT 10,000'MD. PRESSURE UP AND SET BILLET WITH 3700 PSI.SET DOWN 3K TO VERIFY SET.FLOW CHECK AND POOH.MUD WEIGHT IN AND OUT 8.7 PPG. 08:00 - 10:00 2.00 DRILL N HMAN PROD1 POOH AT 100 FPM PUMPING AT 1.2 BPM WITH 1220 PSI. MUD WEIGHT IN AND OUT 8.7 PPG. IA=0 PSI,OA=333 PSI,OOA=0 PSI. PULL TO BHA. 10:00 - 10:30 0.50 DRILL N HMAN PROD1 FLOW CHECK-STATIC.LAY DOWN BHA#4 BILLET ASSEMBLY. 10:30 - 11:00 0.50 DRILL N HMAN PROD1 LD BHA 11:00 - 13:00 2.00 DRILL N HMAN PROD1 PJSM TO CUT PIPE MU CT CUTTER AND CUT 400'OF COIL TEST WIRE,WIRE IS GOOD 13:00 - 13:25 0.42 DRILL N HMAN PROD1 MU CTC 13:25 - 14:15 0.83 DRILL N HMAN PROD1 PT CTC AND UQC 14:15 - 15:00 0.75 DRILL N HMAN PROD1 INSTALL UQC CHECK VALVES AND TEST Printed 9/18/2012 8:41:22AM North America-ALASKA- BP Page 9 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No : NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release: 9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 15:15 0.25 DRILL N HMAN PROD1 PJSM TO MU BHA 15:15 - 15:50 0.58 DRILL N HMAN PROD1 MU BHA#5 WITH 1.5°AKO 15:50 - 16:05 0.25 DRILL N HMAN PROD1 TEST THE QTS 16:05 - 17:55 1.83 DRILL N HMAN PROD1 RIH 17:55 - 18:15 0.33 DRILL N HMAN PROD1 TIE IN 18:15 - 18:30 0.25 DRILL N HMAN PROD1 CORRECT DEPTH-2'AND RIH TO OBTAIN SPR'S 18:30 - 19:15 0.75 DRILL N HMAN PROD1 RUN DOWN AND DRY TAG BILLET AT 10,001'. SET DOWN 2K. PICK BACK UP,BRING ON PUMPS AND SLOWLY RUN IN HOLE UNTIL MOTOR WORK SEEN. MOTOR WORK SEEN AT 9999.5'. 19:15 - 22:00 2.75 DRILL P PROD1 BEGIN TIME MILLING OFF OF BILLET AT 40° ROHS AT RATE OF 1 FPH AT 2.5 BPM,2790 PSI,.5K WOB. MW IN AND OUT 8.75 PPG. INCREASE DIFFERENTIAL MOTOR WORK BY 100 PSI 1.5'INTO MILLING OPERATION. 2.5 BPM,2900 PSI,WOB GRADUALLY INCREASED TO.8K. CONTINUE MILLING WITH THESE PARAMETERS TO 10,004'. MOTOR WORK KEPT AT 80-100 PSI OVER ORIGINAL WORK,WOB INCREASED TO 1.1K. INCREASE WOB AT 10,005'IN ORDER TO ENSURE KICK OFF OF 40°ROHS. 22:00 - 23:30 1.50 DRILL-- P PROD1 CONFIRM ALUMINUM COMING ACROSS SHAKER. DRILL TO 10,040'AT 2.552.6 BPM, 2940-3000 PSI,1.6-2.2K WOB. DRY DRIFT PAST BILLET,GOOD PASS. RUN BACK DOWN WITHOUT PUMPS AND NO BOBBLES. RUN TO 10,040'. BEGIN TO PUMP 40 BBL HI-VIS SWEEP IN PREPARATION FOR MUD SWAP. 23:30 - 00:00 0.50 DRILL P PROD1 FREE SPIN 2890 PSI AT 2.6 BPM. DRILL AHEAD FROM 10,040'. -2.6 BPM,3060 PSI,2.3K WOB,ECD 10.3 PPG 8/22/2012 00:00 - 02:00 2.00 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION FROM, 10,070'. -2.6 BPM,2970-3060 PSI,1.8-4.1K WOB,MW IN AND OUT 8.5 PPG,ECD 10.1 PPG 02:00 - 02:45 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW. NO ISSUES NOTED DURING TRIP. MOVED PAST BILLET WITH NO PROBLEMS. RUN BACK TO BOTTOM WITH NO ISSUES. 02:45 - 04:30 1.75 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION FROM 10.150'. FREE SPIN 2710 PSI AT 2.5 BPM. -2.5-2.7 BPM,3020-3260 PSI,2.2-3.0K WOB, MW IN AND OUT 8.5 PPG,ECD 10.1 PPG -WEIGHT TRANSFER DIFFICULT,POSSIBLE DRILLING BREAK THROUGH BOTTOM OF 13N 04:30 - 05:30 1.00 DRILL P PROD1 WIPER TO WINDOW. NO DIFFICULTY PAST BILLET ON TRIP UP OR BACK DOWN. CONTINUE WITH WIPER TO 10,287'. -25% INCREASE OF CUTTINGS FROM WIPER TRIP. 05:30 - 06:30 1.00 DRILL P PROD1 DRILL AHEAD FROM 10,287'FREE SPIN 3090 PSI AT 2.65 BPM. WIPER TRIP HELPED WITH WEIGHT TRANSFER. Printed 9/18/2012 8.41:22AM North America -ALASKA- BP Page 10 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) 7Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 06:45 0.25 DRILL P PROD1 PU TO OBTAIN SLOW PUMP RATES PUMP#1: PUMP#2: 2.8 BPM-2710 PSI 2.8 BPM-2670 PSI 1.0 BPM- 1630 PSI 1.0 BPM-1615 PSI 0.5 BPM-1400 PSI 0.5 BPM-1415 PSI 06:45 - 07:40 0.92 DRILL P PROD1 CONTINUE DRILLING --IN/OUT RATES=2.65/2.65 BPM FREE/CIRC PS k 2850/3270 PSI IN/OUT DENSITY=8.57/8.60 ECD=10.17 PPG WOB=2.95K ROP=103 FPH PVT=318 BBLS IAP=59 PSI OAP=323 PSI OOAP=11 PSI 07:40 - 08:05 0.42 DRILL P PROD1 WIPER TO WINDOW PVT=313 08:05 - 08:15 0.17 DRILL P PROD1 LOG TIE IN 08:15 - 08:45 0.50 DRILL P PROD1 CORRECT DEPTH+3',RIH 08:45 - 10:00 1.25 DRILL P PROD1 CONTINUE DRILLING IN/OUT RATES=2.57/2.57 BPM FREE/CIRC PS k 2695/3325 PSI IN/OUT DENSITY=8.61/8.61 ECD=10.08 PPG WOB=0.08K ROP=10 FPH PVT=312 BBLS IAP=149 PSI OAP=323 PSI 0OAP=18 PSI DRILLING STARTED OFF OK AND NOW WE ARE HAVING SOME WEIGHT TRANSFER ISSUES GEO SAID WE ARE DRILLING THROUGH A SHALE,WE CAN TAG AND GET MOTOR WORK BUT IT DRILLS OFF AND STACKS OUT. 10:00 - 11:00 1.00 DRILL P PROD1 NOT ABLE TO KEEP WOB AFTER TAGGING BOTTOM JUST DRILLS OFF AND STACKS OUT.THIS IS A NEW MUD SYSTEM BUT DOES NOT HAVE ANY LUBES FOR THE FORMATION AS PER THE WELL PLAN.CALL OUT FOR LUBE 776 TO ADD TO THE MUD TO HELP WITH WEIGHT TRANSFER. LAST 4 SURVEY DLS HAVE GONE FROM 15-16°TO 9°.DD HAS PROJECTED OUT WITH 9°DLS AND WE ARE FINE AND WILL STILL BE IN THE POLYGON. NOTIFIED ODE INTERN DAVID MINGE AND HE IS GOING TO DISCUSS THIS WITH ZACH SAYERS 11:00 - 12:30 1.50 DRILL P PROD1 SLOW DRILLING WAITING ON LUBES TO HELP WEIGHT TRANSFER,TRY REDUCED PUMP RATE TO SEE IF IT HELPS IN/OUT RATES=2.29/2.28 BPM FREE/CIRC PS k 2435/3120 PSI IN/OUT DENSITY=8.57/8.60 ECD=10.08 PPG WOB=0.08K ROP=10 FPH PVT=309 BBLS IAP=158 PSI OAP=323 PSI OOAP=22 PSI 12:30 - 13:20 0.83 DRILL P PROD1 MUD WITH LUBE 776 GOING DOWN HOLE STILL DRILLING IN SHALE STRINGER BETWEEN THE 13&12N SHALES TRYING TO DROP DOWN Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 11 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C:(3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:20 - 13:50 0.50 DRILL P PROD1 LOOKS LIKE THE LUBE IS STARTING TO WORK,WE HAVE GAINED MORE SURFACE WEIGHT AND WE ARE ABLE TO MAINTIAN CONSTANT WOB ROP IS INCREASING,INCREASE PUMP RATE BACK TO 2.6 BPM IN/OUT RATES=2.57/2.57 BPM FREE/CIRC PSI=xxxx/3010 PSI IN/OUT DENSITY=8.58/8.58 ECD=10.15 PPG WOB=3.11K ROP=73 FPH PVT=305 BBLS IAP=251 PSI OAP=321 PSI OOAP=40 PSI 13:50 - 15:10 1.33 DRILL P PROD1 WIPER TO WINDOW 15:10 - 16:00 0.83 DRILL P PROD1 CONTINUE DRILLING IN/OUT RATES=2.67/2.70 BPM FREE/CIRC PSI=2800/3630 PSI IN/OUT DENSITY=8.62/8.59 ECD=10.17 PPG WOB=4.5K ROP=98 FPH PVT=305 BBLS _ IAP=283 PSI OAP=321 PSI OOAP=59 PSI 16:00 - 16:20 0.33 DRILL P PROD1 STILL DRILLING INA SHALE STRINGER BETWEEN THE 13&12N SHALES.GEO SAYS THE DIP IS COMING UP AS WE ARE TRYING TO GO DOWN 16:20 - 16:45 0.42 DRILL P PROD1 ****UNANNOUNCED SPILL DRILL IN THE CELLAR**** DRILLER CALLED OUT OVER THE RADIO THAT THERE WAS A SPILL IN THE CELLAR.8 PERSONNEL SHOWED UP WITH IN 1 MINUTE WITH SHOVELS&ABSORB.MOTORMAN DID NOT HEAR THE ANNOUNCEMENT AS HE WAS IN THE MOTOR ROOM.HAD HE SHOWED UP HE WOULD HAVE BROUGHT A FIRE EXTINGUSHER AS PER THEIR SPILL RESPONSE PROCEDURE.EXCELLENT RESPONSE TIME FROM THE CREW AND THEY WERE READY TO CONTAIN A SPILL. 16:45 - 17:15 0.50 DRILL P PROD1 DRILLING AHEAD IN/OUT RATES=2.60/2.60 BPM FREE/CIRC PSI=2740/3215 PSI IN/OUT DENSITY=8.62/8.64 ECD=10.20 PPG WOB=4.26K ROP=127 FPH PVT=305 BBLS IAP=320 PSI OAP=321 PSI OOAP=81 PSI 17:15 - 19:45 2.50 DRILL N SFAL PROD1 PU OFF BOTTOM AND WIPER TO WINDOW TO FIGURE OUT IF THERE IS A PROBLEM WITH THE BHI DIRECTIONAL SOFTWARE. GIVEN CLEARANCE TO RESUME OPERATIONS AT 1900 HRS. COMPLETE PUMPING HI-VIS PILL AND BOTTOMS UP FROM WINDOW BEFORE RESUMING OPERATIONS. BOTTOMS UP SHOWS NO SIGNIFICANT INCREASE IN CUTTINGS,SHALE EASILY IDENTIFIABLE. 19:45 - 20:45 1.00 DRILL N PROD1 CLOSE EDC. RIA TO RESUME DRILLING. NO ISSUES PAST BILLET. RIH TO 10,450', OBTAIN SLOW PUMP RATES. CONTINUE TO RIH TO 10,720'. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 12 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.276W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:45 - 21:00 0.25 DRILL P PROD1 ON BOTTOM. FREE SPIN 2880 PSI AT 2.55 BPM. BEGIN DRILLING AHEAD. DRILL TO 10,726'AND GET FIRST SURVEY. PICK UP OFF BOTTOM,CONDUCT WIPER TRIP WHILE DD SENDS SURVEY DATA TO TOWN AND WAITS FOR CONFIRMATION. 21:00 - 21:30 0.50 DRILL N PROD1 WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE VERIFICATION OF SURVEY DATA. 21:30 - 22:35 1.08 DRILL P PROD1 ON BOTTOM. FREE SPIN 2800 PSI AT 2.5 BPM. -2.55-2.6 BPM,3000-3230 PSI,1.4-4.5K WOB, ECD 10.2 PPG, MW IN AND OUT 8.6 PPG 2 BBLS LOST DURING DRILLING AHEAD TO 10,755' -TAKE SURVEY,CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION FROM TOWN 22:35 - 22:45 0.17 DRILL N PROD1 WAITING ON VERIFICATION OF SURVEY RECEIVED. VERIFIED,RIH TO CURRENT TD. 22:45 - 23:30 0.75 DRILL P PROD1 ON BOTTOM. FREE SPIN 2900 PSI AT 2.65 BPM. 23:30 - 23:50 0.33 DRILL N PROD1 WAITING ON VERIFICATION OF SURVEY RECEIVED. VERIFIED, RIH TO CURRENT TD. 23:50 - 00:00 0.17 DRILL P PROD1 ON BOTTOM AT 10,785'. FREE SPIN 2980 PSI AT 2.55 BPM. 8/23/2012 00:00 - 00:30 0.50 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION. -2.55-2.6 BPM,3180-3300 PSI,2.1-2.8K WOB, ECD 10.36 PPG,MW IN AND OUT 8.6 PPG -3 BBLS LOST DRILLING THIS FOOTAGE 00:30 - 00:45 0.25 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION,HEAD BACK TO BOTTOM. 00:45 - 01:10 0.42 DRILL P PROD1 BACK ON BOTTOM. FREE SPIN 3000 PSI AT 2.6 BPM. -2.6 BPM,3230 PSI,2K WOB,ECD 10.39 PPG 01:10 - 01:30 0.33 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION,HEAD BACK TO BOTTOM. 01:30 - 02:00 0.50 DRILL P PROD1 ON BOTTOM. 3000 PSI AT 2.6 BPM. WOB AND MOTOR WORK INCREASING IN THIS SECTION. 02:00 - 02:15 0.25 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION,HEAD BACK TO BOTTOM. 02:15 - 02:45 0.50 DRILL P PROD1 WIPER SEEMED TO HELP PRESSURES. FREE SPIN 3000 PSI AT 2.6 BPM. WOB 2.5-2.8K,3300 PSI AT 2.6 BPM. 02:45 - 04:45 2.00 DRILL P PROD1 WIPER TRIP TO WINDOW WITH NO ISSUES. LOG TIE-IN WITH+6.5'CORRECTION. RUN BACK DOWN. NO ISSUES PAST BILLET. CONTINUE TO RIH TO CURRENT TD OF 10,905'. LOSS OF 4 BBLS WHILE DRILLING LAST SECTION AND WIPER TRIP. 04:45 - 05:10 0.42 DRILL P PROD1 DRILL AHEAD FROM 10,905'. FREE SPIN 2920 AT 2.55 BPM. Printed 9/18/2012 8:41:22AM • North America -ALASKA- BP Page 13 of 21 Operation Summary Report Common Well Name: C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: `X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:OOAM Rig Release:9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:10 - 05:20 0.17 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION,HEAD BACK TO BOTTOM. 05:20 - 05:55 0.58 DRILL P PROD1 DRILL AHEAD FROM 10,937'. FREE SPIN 2940 PSI AT 2.5 BPM. 05:55 - 06:10 0.25 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION, HEAD BACK TO BOTTOM. 06:10 - 06:30 0.33 DRILL P PROD1 DRILL AHEAD FROM 10,966'. 06:30 - 07:10 0.67 DRILL P PROD1 PU TO OBTAIN SLOW PUMP RATES PUMP#1: PUMP#2: 2.8 BPM-3014 PSI 2.8 BPM-2980 PSI 1.0 BPM-1780 PSI 1.Q BPM-1775 PSI 0.5 BPM-1476 PSI 0.5 BPM-1458 PSI 07:10 - 07:25 0.25 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION,HEAD BACK TO BOTTOM. 07:25 - 08:45 1.33 DRILL P PROD1 DRILL AHEAD IN/OUT RATES=2.55/2.56 BPM FREE/CIRC PS k 2988/3215 PSI IN/OUT DENSITY=8.65/8.65 ECD=10.46 PPG -WOB=2.5K ROP=50 FPH PVT=265 BBLS IAP=477 PSI OAP=312 PSI OOAP=359 PSI 08:45 - 10:45 2.00 DRILL P PROD1 WIPER TO WINDOW 10:45 - 11:35 0.83 DRILL P PROD1 DRILL AHEAD IN/OUT RATES=2.65/2.65 BPM FREE/CIRC PSI=3100/3460 PSI IN/OUT DENSITY=8.69/8.67 ECD=10.48 PPG WOB=3.65K ROP=60 FPH PVT=294 BBLS -MADE UP 30 BBLS OF LOW-VIS 3%KCL FOR VOLUME IAP=477 PSI OAP=312 PSI OOAP=359 PSI 11:35 - 11:55 0.33 DRILL N PROD1 CONDUCT WIPER TRIP WHILE WAITING ON CONFIRMATION OF SURVEY DATA. RECEIVE CONFIRMATION, HEAD BACK TO BOTTOM. ***BLEED OOA FROM 410 PSI TO 45 PSI.WE HAVE NOT HAD TO BLEED THE IA OR OA THE LAST FEW DAYS*** BLEEDS FROM:IA-ALL FLUID/OA-ALL GAS /OOA-ALL FLUID 11:55 - 12:10 0.25 DRILL P PROD1 DRILL AHEAD FROM 11090' IN/OUT RATES=2.65/2.65 BPM FREE/CIRC PSI=2980/3267 PSI IN/OUT DENSITY=8.63/8.65 ECD= 10.41 PPG WOB=2.26K ROP=60 FPH PVT=294 BBLS -MADE UP 30 BBLS OF LOW-VIS 3%KCL FOR VOLUME IAP=477 PSI OAP=312 PSI OOAP=59 PSI 12:10 - 13:30 1.33 DRILL P PROD1 WE HAVE PERMISSION TO CONTINUE DRILLING BUT WE HAVE TO GET CONFORMATION FOR THE LAST SUVEY BEFORE WE CAN DRILL TO OR PAST THE NEXT SURVEY DEPTH Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 14 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ 13:30 - 13:50 0.33 DRILL P PROD1 ***"KWD DRILL**** DRILLER ANNOUNCED AN INCREASE IN OUT FLOW AND A PIT GAIN.THE CTS SUPERVISOR SIMULATED PICKING UP OFF BOTTOMA ND SHUTING DOWN HIS PUMP. THE NORDIC DRILLER CONFIRMED THERE WAS STILL FLOW AND THE WELL WAS SIMULATED TO BE SHUT IN WITH THE HCR. THE PRESSURE WAS MONITORED WITH A STABILIZED WHP OF 80 PSI.THE CREW LINED UP TO TAKE RETURNS THROUGH THE MGS,EQUALIZED THE PRESSURE BETWEEN THE CHOKE AND WH AND OPENED THE HCR TO A CLOSED CHOKE.THE CTS DRILLER CAME ON LINE WITH THE RIG PUMP AT 1.0 BPM,WHEN THE WHP STARTED TO INCREASE THE NORDIC DRILLER OPENED THE CHOKE AND MAINTAINED CONSTANT COIL PRESSURE FOR 1 CIRCULATION. CLOSE TO A BOTTOMS UP VOLUME THE OUT FLOW INCREASED AND GAS WAS NOTICED GOING THROUGH THE MICRO-MOTION. AFTER A BOTTOMS UP WAS CIRCULATED THE OUT RATE&DENSITY STABILIZED AND THE PUMP WAS SHUT DOWN AND THE WELL WAS SHUT IN TO CHECK FOR PRESSURE. WITH A ZERO PSI INCREASE THE CHOKE WAS OPENED AND NO FLOW WAS SEEN AT THE SHAKER AND THE DRILL WAS CONCLUDED. 13:50 - 15:45 1.92 DRILL P PROD1 WIPER TO WINDOW PVT=290 BBLS ALL SURVEY'S SENT TO TOWN HAVE BEEN GOOD 15:45 - 19:15 3.50 DRILL P PROD1 BACK ON BOTTOM DRILLING IN/OUT RATES=2.56/2.60 BPM FREE/CIRC PSI=2950/3250 PSI IN/OUT DENSITY=8.69/8.67 ECD=10.39 PPG WOB= 1.85K ROP=70 FPH PVT=285 BBLS LOST 5 BBLS DURING TRIP IAP=485 PSI OAP=305 PSI OOAP=66 PSI 19:15 - 20:45 1.50 DRILL P PROD1 WIPER TRIP TO WINDOW WITH NO ISSUES. LOG TIE-IN WITH+6'CORRECTION. PULL INTO WINDOW,OPEN EDC. PULL UP HOLE PUMPING AT MAX RATE TO 9100'.- 20:45 - 21:30 0.75 DRILL P PROD1 LOG CCL FROM 9100'TO 9600'. CLOSE EDC. 21:30 - 22:45 1.25 DRILL P PROD1 RIH FROM WINDOW TO CURRENT TD OF 11,350'. 22:45 - 00:00 1.25 DRILL P PROD1 DRILL AHEAD FROM 11,350'. FREE SPIN 3130 PSI AT 2.6 BPM. -2.6-2.7 BPM,3420-3510 PSI,3.3-3.9K WOB, ECD 10.6 PPG,MW IN AND OUT 8.7 PPG -BEGIN TO DISPLACE TO NEW MUD WHILE DRILLING AHEAD 8/24/2012 00:00 - 01:15 1.25 DRILL P PROD1 DRILL AHEAD FROM 11,440'. DISPLACING TO NEW MUD. NEW MUD AROUND, PRESSURES AND ECD HAVE DROPPED. -2.60-2.65 BPM,2760 PSI,2K WOB,ECD 9.95 PPG,MW IN AND OUT 8.55 PPG Printed 9/18/2012 8:41:22AM North America -ALASKA- BP • Page 15 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:15 - 04:30 3.25 DRILL P PROD1 WIPER TO WINDOW. PICK UP OFF BOTTOM, OBTAIN SLOW PUMP RATES. CONTINUE WITH WIPER TO WINDOW WITH NO ISSUES. 04:30 - 06:00 1.50 DRILL P PROD1 DRILL AHEAD FROM 11,500'. FREE SPIN 2710 PSI AT 2.75 BPM. 06:00 - 07:15 1.25 DRILL P PROD1 DRILL AHEAD - IN/OUT RATES=2.81/2.82 BPM FREE/CIRC PS k 2800/3320 PSI IN/OUT DENSITY=8.56/8.54 ECD=9.95 PPG WOB=3.45K ROP=80 FPH PVT=319 BBLS IAP=197 PSI OAP=292 PSI OOAP=0 PSI 07:15 - 09:55 2.67 DRILL P PROD1 WIPER Tb WINDOW PVT=318 BBLS 09:55 - 10:05 0.17 DRILL P PROD1 OBTAIN SPR'S THEN CONTINUE DRILLING 10:05 - 12:40 2.58 DRILL P PROD1 DRILL AHEAD IN/OUT RATES=2.60/2.62 BPM FREE/CIRC PSI=2800/3260 PSI IN/OUT DENSITY=8.56/8.54 ECD=9.95 PPG WOB=4.21K ROP=95 FPH PVT=311 BBLS IAP=298 PSI OAP=288 PSI OOAP=0 PSI 12:40 - 14:00 1.33 DRILL P PROD1 WIPER TO WINDOW PVT=305 BBLS 14:00 - 14:15 0.25 DRILL P PROD1 .LOG TIE IN 14:15 - 15:25 1.17 DRILL P PROD1 CORRRECT DEPTH+7',RIH 15:25 - 16:40 1.25 DRILL P PROD1 DRILL AHEAD IN/OUT RATES=2.50/2.49 BPM FREE/CIRCPS 2900/3333 PSI IN/OUT DENSITY=8.59/8.57 ECD=9.95 PPG WOB=4.5K ROP=70 FPH PVT=297 BBLS IAP=463 PSI OAP=286 PSI OOAP=29 PSI DRILLING THIN LAYER OF SILTY SHALE 16:40 - 16:55 0.25 DRILL P PROD1 TAKING A LOT OF WEIGHT JUST TO DRILL, STILL DRILLING THAT THIN LAYER OF SHALE TRYING TO DROP THROUGH IT INTO THE LOWER PART OF Z1.DIFF PRESSURE DRILLED OFF PU AND PULLED HEAVY 30'OFF BOTTOMA DN HAD TO WORK IT FREE GOING DOWN.SLOW BACKREAM TO ENSURE HOLE IS CLEAN THEN CONTINUE DRILLING 16:55 - 18:00 1.08 DRILL P PROD1 CONTINUE DRILLING 18:00 - 18:20 0.33 DRILL P PROD1 GEO THINKS WE NEED TO COME BACK UP, DOESN'T LIKE THE QUALITY OF ROCK WE ARE SEEING BELOW THIS SHALE STILL TAKING A LOT OF WEIGHT TO DRILL WITH GOOD WOB&DIFF PRESSURE,BIT MIGHT BE GETTING DULL OR BALLED UP.GIVE IT A LITTLE MORE TIME AND IF I DON'T SEE ANY IMPROVEMENT SOON WE WILL PULL TO CHECK THE BIT AND RUN THE CALIPER LOG. WE HAVE MADE ALMOST 2000'PLUS SIDE TRACKED OF THE BILLET WITH THIS BHA. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP i Page 16 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release: 9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:20 - 21:30 3.17 DRILL P PROD1 NOT SEEING ANY IMPROVEMENT IN DRILLING.STILL STACKING WT WITH OK WOB AND OK DIFF PRESSURE FLOW CHECK WELL. NO FLOW POOH TO CHECK THE BIT AND RUN THE CALIPER LOG WIPER TO WINDOW GOOD PUMP HI-VIS PILL TO TIME --WITH WASHING ACROSS WHIPSTOCK TRAY. FLOW CHECK WELL INSIDE WINDOW, NO FLOW. OPEN EDC IN WINDOW,JET ACROSS TRAY UNTIL PILL ABOVE WINDOW, POH AT MAX RATE. 21:30 - 22:15 0.75 DRILL P PROD1 CONDUCT KICK WHILE TRIPPING DRILL WITH MAN DOWN. CREW RESPONSE FOLLOWED STANDING ORDERS. FLOORHAND AND ROUSTABOUT HAVE TO STEP UP TO NEXT POSITIONS'REACTION DUTIES. SIMULATE WELL FLOW,CLOSE IN HCR. INDICATE WELL HEAD PRESSURE. DISCUSS WHO TO MAKE NOTIFICATIONS TO, SIMULATE SITP AND SICP HAVE STABILIZED. PLAN FORWARD IS TO EQUALIZE BETWEEN CHOKE AND HCR, LINE UP TO MUD GAS SEPARATOR. HAVE .ROUSTABOUT AND FLOORHAND DEMONSTRATE LINE UP. CONDUCT AAR WITH CREW. 22:15 - 23:45 1.50 DRILL P PROD1 BRING ON PUMPS, POH WITH BHA TO 300'. CONDUCT PJSM ON FUNCTION TEST AND LAYING DOWN BHA WHILE TRIPPING. FLOW CHECK AT 300',NO FLOW. PULL TO 180'BIT DEPTH,CONDUCT BOP FUNCTION TEST FROM DRILLERS CONSOLE. 23:45 - 00:00 0.25 DRILL P PROD1 POP OFF,SLOWLY REEL COIL WHILE INSPECTING FOR ANY DAMAGE FROM FUNCTION TEST. SLIP MARKS IDENTIFIABLE BUT NO DAMAGE TO COIL. 8/25/2012 00:00 - 02:15 2.25 DRILL P PROD1 LD DRILLING BHA. BIT GRADE 1-1-NO. AAR ON LAYING DOWN BHA SINCE THIS WAS THE FIRST BHA WITH THIS CREW THIS HITCH. NO COMMENTS REGARDING CHANGE. PJSM ON MU OF OPEN HOLE CALIPER LOGGING BHA. MU BHA WITH NO ISSUES. PRESSURE TEST QUICK TEST SUB. GOOD TEST. 02:15 - 04:15 2.00 DRILL P PROD1 RIH WITH CALIPER BHA 04:15 - 04:45 0.50 DRILL P PROD1 LOG TIE-IN WITH-3'CORRECTION 04:45 - 06:20 1.58 DRILL P PROD1 RIH WITH CALIPER BHA 06:20 - 06:35 0.25 DRILL P PROD1 TAG TD AND PU OFF BOTTOM AND WAIT FOR FINGERS TO OPEN 06:35 - 07:30 0.92 DRILL P PROD1 POOH LOGGING UP AT 50 FPM Printed 9/18/2012 8:41:22AM North America -ALASKA- BP • Page 1 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.. NORDIC 1 Spud Date/Time:2/13/1973 12:00:OOAM Rig Release: 9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat:070°1748.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:40 - 07:50 0.17 DRILL P PROD1 LOST POWER TO THE RIG WHILE POOH IN THE CASED HOLE. DRILLER WAS ON THE FLOOR AND FLOOR HAND WAS AT THE SHAKER TO MONITOR THE WELL FOR FLOW WHILE THE GENERATORS WERE BEING BROUGHT ONLINE. TRIP SHEET SHOWS A LOSS OF 2 BBLS WHILE LOGGING WHICH IS CONSISTANT WITH OUR SHORT TRIPS WHILE DRILLING. GENERATORS ARE BACK ONLINE, NO FLOW AT THE SHAKER, BRING PUMP ONLINE, NO LOSSES. CONTINUE POOH TO 9100'AND LET CALIPER FINGERS CLOSE CALLED DRLG SUPT TO LET HIM KNOW WHAT HAPPENED. 07:50 - 09:15 1.42 DRILL P PROD1 STOP AT 9100'AND WAIT FOR FINGERS TO CLOSE 09:15 - 09:45 0.50 DRILL P PROD1 PJSM TO LD LOGGING BHA 09:45 - 09:55 0.17 DRILL P PROD1 STOP AT 200'TO CHECK WELL FOR FLOW 09:55 - 10:35 0.67 DRILL -P PROEM GOOD NO FLOW CHECK,TUG UP,REMOVE INJECTOR AND LD LOGGING BHA 10:35 - 10:45 0.17 DRILL P PROD1 BHA OH WITH ALL THE FINGERS AND TOES 10:45 - 11:15 0.50 DRILL . P PROD1 CHANGED PACK-OFFS AND NEED TO TEST HOLD PJSM TO PU INJECTOR AND PT PU INJECTOR, FILL THE HOLE AND CLOSE THE SWAB LINE UP TO TEST THROUGH THE KILL LINE 11:15 - 11:30 0.25 DRILL P PROD1 BHI CHECKS ARE LEAKING FLOW CHECK WELL,NO FLOW,PU INJECTOR AND REPLACE BHI CHECKS 11:30 - 11:50 0.33 DRILL P PROD1 RETEST PACK-OFFS AND BHI CHECKS 11:50 - 12:00 0.17 DRILL P PROD1 GOOD TEST BLEED OF AND OPEN SWAB GOOD NO FLOW, FILL HOLE,HOLE IS FULL PU INJECTOR AND MU DRILLING BHA#7 12:00 - 12:15 0.25 DRILL P PROD1 HOLD PJSM TO MU DRILLING BHA 12:15 - 12:45 0.50 DRILL P PROD1 MU BHA#7 PU INJECTOR AND MU COIL TO BHA 12:45 - 13:00 0.25 DRILL P PROD1 PT QTS 13:00 - 14:00 1.00 DRILL P PROD1 RIH 14:00 - 14:50 0.83 DRILL P PROD1 """FIRE DRILL IN THE MOTOR ROOM"" GOOD RESPONNSE FROM THE CREW SHOWING UP WITH FIRE EXTINGUISHERS READY TO PUT OUT A FIRE.THE DRILLER MADE A GOOD SUGGESTION IN THE AAR AND HE IS GOING TO REQUEST GETTING CO2 FIRE EXTIGUISHERS FOR THE THE MOTOR ROOM.THE REGULAR ANSUL EXTIINGUISHERS WILL DAMAGE THE MOTORS IN THE MOTOR ROOH IF THEY ARE DISCHARGED AND IT GETS SUCKED INTO THE INTAKE. 14:50 - 15:05 0.25 DRILL P PROD1 LOG TIE IN 15:05 - 15:15 0.17 DRILL P PROD1 -1'CORRECTION,STBY WOO 15:15 - 16:40 1.42 DRILL P PROD1 DRILLING DIRECTIONAL PLAN CHANGE, FLOW CHECK WELL AND POOH FOR AGITATOR Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 18 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375'5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:40 - 16:55 0.25 DRILL P PROD1 PJSM TO PULL BHA TO ADD AGITATOR 16:55 - 17:05 0.17 DRILL P PROD1 FLOW CHECK 17:05 - 17:45 0.67 DRILL P PROD1 GOOD NO FLOW CHECK,TAG UP AND PULL BHA TO ADD AGITATOR REMOVE LOWER DFCV AND REPLACE WITH --FLOAT VALVES 17:45 - 22:00 4.25 DRILL P PROD1 PU INJECTOR AND MU TO BHA, PT QTS AND RIH. LOG TIE-IN WITH-2'CORRECTION. CONTINUE TO RIH TO CURRENT TD OF 11,931'. OBTAIN AND RECORD SLOW PUMP RATES. ON BOTTOM AT 11,925'. 22:00 - 00:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 11,925'. FREE SPIN 3390 PSI AT 2.6 BPM. -2.6 BPM,3490-3925 PSI,1.8-4.8K WOB,ECD 10.4-10.6 PPG,MW IN AND OUT 8.6 PPG 8/26/2012 00:00 - 04:00 4.00 DRILL P .PROD1 DRILL AHEAD IN LATERAL SECTION FROM 12,000'. FREE SPIN 3390 PSI AT 2.6 BPM. • 2.6 BPM,3490-3925 PSI,1.8-4.8K WOB,ECD - 10.4-10.6 PPG,MW IN AND OUT 8.6 PPG HAVING TO STACK DOWN A LOT ON THE COIL TO GET WEIGHT ON BIT. CIRC 'PRESSURES HIGH DUE TO USE OF AGITATOR. -NEW MUD ON LOCATION. BEGIN DISPLACING TO NEW MUD TO COINCIDE WITH WIPER TRIP AT 12,100'. -STACKED OUT WITH COIL AT 12,085'. CANNOT MAKE ANY PROGRESS,ATTEMPT TO MAKE BHA WIPER. 04:00 - 06:20 2.33 DRILL N STUC PROD1 ATTEMPT TO MAKE WIPER TRIP RESULTED IN TWO OVERPULLS OF 30-35K IN ATTEMPT TO COME OFF BOTTOM AT 12,085'. -NOT SEEING WOB,ABLE TO ORIENT,HAVE FULL CIRCULATION. INDICATIONS ARE DIFFERENTIALLY STUCK. -SET COIL AT NEUTRAL,DOWN ON PUMPS TO LET FORMATION RELAX. ATTEMPT TO PICK UP AFTER 10 MINUTES WITH NO PUMPS ON. PICK UP TO 85K PUW,COME ON WITH PUMPS. NO SUCCESS. ATTEMPT TO MOVE DOWN,NO SUCCESS. -SET COIL INTO NEUTRAL WEIGHT AGAIN, DOWN ON PUMPS. ALLOW TO SET FOR 30 MINUTES TO RELAX FORMATION. ATTEMPT TO PICK AND SET DOWN AGAIN WITH THREE ATTEMPTS. NO SUCCESS. CALL OUT MINERAL OIL,DOWN ON PUMPS TO LET FORMATION RELAX WHILE WAITING ON TRUCKING. -SET DOWN 5K IN ATTEMPT TO MOVE STRING DOWN. Printed 9/18/2012 8.41:22AM North America -ALASKA- BP Page 19 of 21 Operation Summary Report Common Well Name:C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) I Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117 95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.. NORDIC 1 Spud Date/Time:2/13/1973 12.00:OOAM Rig Release: 9/3/2012 Rig Contractor NORDIC CALISTA UWI./Lat.070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:20 - 07:35 1.25 DRILL N STUC PROD1 ATTEMPT TO PULL FREE PULLING UP TO MAX WEIGHT AT 90K 3 ATTEMPTS STACKING OUT TO-15K THEN PICKING UP TO 92K WERE UNSUCCESSFUL 06:40 TRUCK LOADING MINERAL OIL AT MI LINE UP TO FILL THE HOLE ACROSS THE TOP -TO ENSURE THE HOLE IS FULL.HOLE IS FULL ATTEMPT TO PULL FREE AGAIN,NO MOVEMENT IN EITHER DIRECTION HOLDING 85K MIX UP HI-VIS PILL TO PUMP AHEAD AND BEHIND THE MINERAL OIL 07:35 - 08:20 0.75 DRILL N STUC PROD1 MINERAL OIL IS ON LOCATION,TRY WORKING PIPE AGAIN BEFORE PUMPING LVT 08:20 - 08:30 0.17 DRILL N STUC PROD1 CALLED WTL JIM WILLINGHAM AS PER THE WELL PLAN BEFORE PUMPING MINERAL OIL TO DISCUSS HYDROSTAIC PRESSURE LOSS FROM MINERAL OIL AND WE WILL STILL BE —600 PSI OVERBALANCED WITH 20 BBLS OF MINERAL OIL IN THE WELL.WE HAVE APPROVAL TO PUMP THE MINERAL OIL ONLINE WITH PUMP TO ESTABLISH CIRCULATION,WE HAVE 1:1 RETURNS EVERYTHING LOOKS GOOD 08:30 - 09:05 0.58 DRILL N STUC PROD1 SWAP TO 10 BBL HI-VIS PILL FOLLOWED BY 20 BBLS OF MINERAL OIL THEN 10 BBLS OF HI-VIS PILL 09:05 - 09:25 0.33 DRILL N STUC PROD1 52 BBLS MINERAL OIL IS AT THE BIT,PUMP 10 BBLS OUT AND SHUT DOWN THE PUMP AND ALLOW OIL TO SOAK FOR 20 MIN 09:05 SHUT DOWN PUMP 09:25 - 11:00 1.58 DRILL P PROD1 PULLED FRE AT—70K, PUH SLOW TO DISPLACE REMAINING MINERAL OIL LITTLE OVERPULL WITH SOME MOTOR WORK AT 11300' HI-LOW VIS PILLS ARE BRINGING UP A LOT OF CUTTINGS 11:00 - 11:10 0.17 DRILL P PROD1 LOG TIE INTO RA 11:10 - 12:15 1.08 DRILL P PROD1 CORRECT DEPTH+15.5' PU INTO CASING AND OPEN EDC AND PUMP AT MAX RATE UNTIL RETURNS CLEAN UP PULLED A SAMPLE FOR THE GEO TO LOOK AT AND SEE IF ITS NORMAL CUTTINGS OR SPLINTERED SHALES THE CUTTINGS ARE MOSTLY GROUND UP AND SPLINTERED SHALE,CONTINUE TO CIRC BOTTOMS UP 12:15 - 13:30 1.25 DRILL P PROD1 WE ARE NOT SURE IF THESE ARE FROM NOT CLEANING THE TUBING VERY WELL OR IF THIS IS WHAT WE DRILLED INTO.CALL ODE AND DISCUSS THE OPTION OF DRILLING AHEAD 25'PUMPING UP 2 SAMPLES ONE AFTER DRILLING 1'AND ANOTHER AFTER DRILLING 25'TO SEE IF THE SPLINTERED SHALE IS WHAT WE ARE DRILLING NOW OR NOT. Printed 9/18/2012 8:41:22AM North America -ALASKA- BP Page 20 of 21 Operation Summary Report Common Well Name: C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/16/2012 End Date: X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375°5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:30 - 14:25 0.92 DRILL P PROD1 BACK ON BOTTOM AT 12085',TRIP IN HOLE WAS PRETTY CLEAN IN/OUT RATES=2.55/2.57 BPM FREE/CIRC PSS 3300/3675 PSI IN/OUT DENSITY=8.69/8.65 ECD=10.62 PPG WOB=3.85K ROP=20 FPH PVT=207 BBLS -.IAP=54 PSI OAP=249 PSI OOAP=0 PSI WOB IS PRETTY CONSISTANT AS WE ARE GAINING MORE SURFACE WEIGHT AND ROP IS SLOWLY INCREASING 14:25 - 18:00 3.58 DRILL P PROD1 DRILLED 25'TO 12110'PU AND WAIT FOR BOTTOMS UP SAMPLE FIRST SAMPLE FROM 12085' HAS A LOT LESS SPLINTERED SHALES ONLY-15%VS 90% 18:00 - 19:00 1.00 DRILL P PROD1 BACK ON BOTTOM,CONTINUE WITH DRILLING AHEAD FROM 12,110'. DRILL TO 12,182'WITH STICKY PICKUPS. DECIDE TO MAKE WIPER TRIP AT 100' INTERVAL DUE TO PREVIOUS HOLE ISSUES EXPERIENCE. 19:00 - 21:40 2.67 DRILL P PROD1 WIPER TRIP TO WINDOW. GOOD FLOW OF CUTTINGS ACROSS SHAKERS,@ 20%SILTY SHALE,50%COARSE SANDSTONE AND 30% SILT STONE. WIPER TRIP UP GOOD WITH NO SIGNIFICANT OVERPULLS OR MOTOR WORK. RUN BACK DOWN WITH VERY LITTLE ISSUES. OBTAIN SLOW PUMP RATES. TAG BOTTOM AT 12,172'. 21:40 - 00:00 2.33 DRILL P PROD1 FREE SPIN 3600 PSI AT 2.6 BPM. ATTEMPT TO DRILL AHEAD. STALL IMMEDIATELY. PICK UP WITH 24K OVERPULL. RUN BACK DOWN SLOWLY AND RE-TAG LIGHTLY. DRILL AHEAD. -2.6 BPM,3765-3890 PSI,1.5-3.7K WOB,ECD 10.7 PPG,MW IN AND OUT 8.7 PPG 8/27/2012 00:00 - 01:00 1.00 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION FROM 12,240'. -2.65 BPM,3890-3915 PSI,1.4-1.8 K WOB, ECD 10.8 PPG, MW IN AND OUT 8.7 PPG -CLEAN PICK UP OFF BOTTOM FOR WIPER TRIP 01:00 - 04:00 3.00 DRILL P PROD1 WIPER TRIP CLEAN TO 11,160'. 20K OVERPULL. RUN DOWN, PULL BACK THROUGH CLEAN. CONTINUE WITH WIPER. PUMP A 10 BBL HI-VIS!20 BBL LO-VIS/10 BBL HI-VIS PILL TO COINCIDE WITH PULLING THROUGH THE WINDOW IN ATTEMPT TO CLEAN WHIPSTOCK TRAY AND MOVE LOWSIDE CUTTINGS UP HOLE. PULL INTO WINDOW,OPEN EDC,JET ACROSS WHIPSTOCK TRAY,AND CHASE SWEEP OUT OF HOLE AT MAX FLOW RATE. SIGNIFICANT INCREASE OF CUTTINGS ACROSS SHAKERS WITH SWEEP:PRIMARILY SANDSTONE AND SHALE MIX. CONTINUE WITH PUMPING AT HIGH RATE UP TO 8600'TO CHASE CUTTINGS OUT OF HOLE; BOTTOMS UP AND SHAKERS CLEANED UP. Printed 9/18/2012 8:41:22AM North America-ALASKA- BP Page 21 of 21 Operation Summary Report Common Wet Name: C-03 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/16/2012 End Date: 1X3-0124X-C: (3,127,117.95) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:OOAM Rig Release:9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 06:10 2.17 DRILL P PROD1 RIH TO 9600'. CLOSE EDC. RIH AND LOG TIE-IN AT 9650'WITH+12.5'CORRECTION. RIH. SET DOWN AT 10,800'. PICK UP, ORIENT BIT,MOVE THROUGH WITH NO PROBLEM. 06:10 - 06:20 0.17 DRILL P PROD1 OBTAIN SLOW PUMP RATES&PRESSURES 06:20 - 09:50 3.50 DRILL P PROD1 BACK ON BOTTOM DRILLING IN/OUT RATES=2.50/2.47 BPM FREE/CIRC PS k 3420/3810 PSI IN/OUT DENSITY=8.71/8.65 ECD=10.62 PPG WOB=3.22K ROP=60 FPH PVT=309 BBLS IAP=457 PSI OAP=245 PSI OOAP=183 PSI DRILLING PARAMETERS LOOK GOOD,WOB, CIRC PSI,SURFACE WT AND GAMMA IS CLEANING UP.GEO THINKS WE ARE COMING OUT OF THE 13N AND IN TO THE 1B 09:50 - 11:50 2.00 DRILL t P PROD1 WIPER TO WINDOW,STACKING WEIGHT AND GETTING A LITTLE STICKY 11325'PULLED INTO SOMETHING AT THE BIT. ABLE TO WORK FREE GOING DOWN 11:50 - 12:40 0.83 DRILL P PROD1 PUMP A PILL 10 HI-VIS/20 LO-VIS/10 HI-VIS ,AND RIH _ 12:40 - 15:30 2.83 DRILL P PROD1 THE LEAD OF THE PILL HAS PLUGGED OFF THE OUT MICRO MOTION. SWAPPED RETURNS OVER TO THE BYPASS AND DID NOT SEE A SEVERE INCREASE IN CUTTINGS BUT THERE WAS A FAIR AMOUNT OF FINGER TIP SIZE ROCKS THAT PROBABLY PACKED OFF THE MM 15:30 - 15:50 0.33 DRILL P PROD1 BACK ON BOTTOM DRILLING IN/OUT RATES=2.44/2.43 BPM FREE/CIRC PSI=3420/3690 PSI IN/OUT DENSITY=8.73/8.70 ECD=10.85 PPG WOB=1.62K ROP=55 FPH PVT=288 BBLS IAP=724 PSI OAP=240 PSI OOAP=348 PSI 15:50 - 17:40 1.83 DRILL P PROD1 WELL AT TD,WIPER TO WINDOW 17:40 - 18:10 0.50 DRILL P PROD1 PUMP PILL WHILE POOH TO WINDOW 18:10 - 19:30 1.33 DRILL P PROD1 IN CASING,OPEN EDC AND PUMP A BOTTOMS UP AT MAX RATE WHILE PICKING UP. GOOD RETURNS FROM BOTTOMS UP. 19:30 - 22:00 2.50 DRILL P PROD1 RIH TO 9600',CLOSE EDC. LOG TIE-IN WITH +9'CORRECTION. CONTINUE TO RIH WITH NO ISSUES. TAG BOTTOM AT 12,515',SET DOWN 2K TO CONFIRM. TD IS 12,515'. 22:00 - 00:00 2.00 DRILL P PROD1 FLOW CHECK ON BOTTOM. NO FLOW. PUMP LINER PILL DOWN,LAY IN LINER PILL WITH BEADS WHILE POH. 8/28/2012 00:00 - 04:30 4.50 DRILL P PROD1 POH WITH DRILLING BHA. PULL INTO WINDOW WITH NO ISSUES. OPEN EDC. PULL UP HOLE TO 9290`. PAINT FLAG(9200' EOP). CONTINUE PULLING UP HOLE TO 6390'. PAINT FLAG(6300' EOP). POH TO SURFACE. FLOW CHECK AT 250'. PJSM ON LD BHA DURING FLOW CHECK. Printed 9/18/2012 8:41:21AM North America -ALASKA- BP Page 1 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type: COM-ONSHORE(CON) Start Date: 8/27/2012 End Date: 9/3/2012 X3-0124X-C: (1,429,614.45) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 2/13/1973 12:00:00AM Rig Release: 9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/28/2012 04:30 - 06:40 2.17 RUNCOM P RUNCMP LD BHA. HOLE IS FULL CHANGE OUT COIL TUBING CONNECTOR AND PREPARE TO PUMP SLACK. 06:40 - 11:30 4.83 RUNCOM P RUNCMP PRESSURE TEST BTT CTC PUMP SLACK OUT OF COIL CUT OFF EXCESS ELINE AND SEAL END OF -ELINE LOAD 3/4"BALL AND DRIFT COIL BALL RECOVERED, HEARD BALL LEAVE THE REEL AT 44 BBLS. COIL VOL=53 BBLS PREP FLOOR TO MU&RUN LINER VERIFY LINER IN PIPE SHED IS CORRECT WITH WSL,TP, DRILLER&BTT REP MU DRIFT TO DRIFT FIRST 5 JOINTS OF EACH LINER SIZE AS PER WELL PLAN 11:30 - 23:30 12.00 RUNCOM P RUNCMP COMPLETE MU OF LINER PROGRAM:GUIDE SHOE, FLOAT COLLAR,JT OF 2-7/8"STL TUBING,FLOAT COLLAR,LANDING COLLAR, STAGE COLLAR,65 JTS 2-7/8"STL TUBING, XO,31 JTS 3-1/4"STL TUBING WITH TCII CONNECTIONS,XO,1 JT 3-1/2"STL TUBING,X NIPPLE,DEPLOYMENT SLEEVE. MU HEAD -PIN AND CIRCULATE MUD UNTIL FULL RETURNS TO FILL PIPE AND REMOVE AIR. MU BAKER LINER RUNNING TOOL ASSEMBLY. MU TO INJECTOR. PRESSURE TEST QUICK TEST SUB. 23:30 - 00:00 0.50 RUNCOM P RUNCMP RIH WITH LINER PROGRAM 8/29/2012 00:00 - 03:00 3.00 RUNCOM P RUNCMP RIH WITH LINER PROGRAM. EOP FLAG AT 8300'ON DEPTH WITH MECHANICAL COUNTER,+12'DIFFERENCE WITH BIT DEPTH. PUW 42K AT WINDOW. CONTINUE TO RIH. TROUBLE WORKING THROUGH 10,850',11,780-11,890',12,340',12,380-12.396', AND 12,470-12,520'. EOP FLAG AT 9200'ON DEPTH WITH MECHANICAL COUNTER,+12' DIFFERENCE WITH BIT DEPTH. MAKE SEVERAL ATTEMPTS TO WORK PAST 12,521' BUT CAN'T;SET DOWN TO 12K EACH TIME. CALL 12,521'UNCORRECTED TD. 03:00 - 04:30 1.50 RUNCOM P RUNCMP POSITION REEL FOR BALL DROP. DROP BALL. PUMP AROUND,SET LINER IN COMPRESSION WHILE PUMPING BALL DOWN. BALL NOT ON SEAT AT CALCULATED VOLUME. MOVE STRING,VARY PUMP RATES. BALL FINALLY ON SEAT, POSITIVE INDICATION OF SHEAR AT 4400 PSI. 04:30 - 08:00 3.50 RUNCOM P RUNCMP DISPLACE TO KCL AT 2.3 BPM,ORIGINAL CIRCULATING PRESSURE 2900 PSI,FINAL CIRCULATING PRESSURE AT 1245 PSI, CIRCULATION PRESSURE AT 1.5 BPM IS 560 PSI. PUW WITH KCL AROUND IS 36K,PICK UP TO 12,510'. CONTINUE TO CIRCULATE WHILE CHANGING OUT AND CEMENTERS RIGGING UP. Printed 9/18/2012 8:41:44AM North America -ALASKA- BP Page 2 of 10 Operation Summary Report � �� , Common Well Name:C-03 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/27/2012 I End Date: 9/3/2012 X3-0124X-C: (1,429,614.45) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°1748.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 09:00 1.00 RUNCOM P RUNCMP HOLD PJSM ON PRESSURE TESTING CEMENT LINE. FEED 5-BBLS KCL TO CEMENT UNIT. TEST TO 250-PSI/6000-PSI USING TEMPORARY PIPEWORK CRITERIA. GOOD TESTS. IA/OA/OOA=0-PSI/220-PSI/20-PSI. 09:00 - 10:15 1.25 RUNCOM N FLUD RUNCMP WAIT ON VAC TRUCK TO EMPTY CUTTINGS BOX. 10:15 - 10:45 0.50 CEMT P RUNPRD HOLD PJSM WITH RIG TEAM,SLB CMT, CH2 LEAD&DRIVERS,BTT REP. DISCUSS ORDER OF OPERATIONS, HAZARDS ASSOCIATED WITH HIGH PRESSURE PUMPING, IMPORTANCE OF CLEAR& CONCISE COMMUNICATION,OBLIGATION& RESPONSIBILITY TO STOP JOB IF ANYTHING DOESN'T LOOK RIGHT. 10:45 - 11:15 0.50 CEMT P RUNPRD SLB BATCH UP 40-BBLS CEMENT. SEEING -4-6 BPH LOSS RATE. DISCUSS WITH ODE AND DECIDE TO PUMP 1.2-BBLS ADDITIONAL CEMENT TO COMPENSATE FOR LOSS RATE. CEMENT BATCHED UP AT 1115-HRS. 11:15 - 13:00 1.75 _ CEMT P RUNPRD SLB PUMP 34.6-BBLS 15.8-PPG CLAS CEMENT-AT 1.5 TO 2-BPM/700 TO 2500-PSI. 'DISPLACE CEMENT WITH 8.4-PPG KCL WITH G CPPB BIOZAN. SIDE EXHAUST 2-BBLS 15.8-PPG CEMENT& 3-BBLS 8.4-PPG 2%KCL WITH 2-PPB BIOZAN. SHEAR LINER WIPER PLUG WITH.6-BBLS PUMPED AND 3300-PSI. DISPLACE LINER WIPER PLUG WITH 19.4-BBLS KCL AND BUMP PLUG EXACTLY AS CALCULATED. CIP AT 1242-HRS. CHECK FLOATS-NO FLOW. PRESSURE UP TO 600-PSI&UNSTING FROM LINER. PRESSURE BLEED OFF IS SLOW. PU TO 12,493'AND DISCUSS SITUATION. OUT MM INDICATES-5-BBLS(20%OH EXCESS) SHOULD BE ABOVE LINER TOP. RIH TO JUST ABOVE LINER&PUMP 6-BBLS BIOZAN AT .5-BPM. 13:00 - 16:30 3.50 CASING P RUNPRD POH WITH LINER RUNNING TOOLS, CONTAMINATING WITH 2-PPB BIOZAN. CIRCULATE AT 1-BPM/960-PSI. SEE CEMENT RETURNS WITH MAX DENSITY OF 9.4-PPG. DUMP ALL CEMENT CONTAMINATED RETURNS OVERBOARD- -35-BBLS. TAKE ALL BIOZAN RETURNS OVERBOARD AS WELL. TAG UP AND MAKE 1000'JOG FROM SURFACE-NO FURTHER CEMENT SEEN, CONTINUE TO DUMP BIOZAN RETURNS. **24-HR NOTICE GIVEN TO AOGCC REGARDING BIWEEKLY BOPE TEST AT 1330-HRS.** Printed 9/18/2012 8:41:44AM • North America -ALASKA- BP Page 3 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type: COM-ONSHORE(CON) Start Date: 8/27/2012 End Date: 9/3/2012 X3-0124X-C: (1,429,614.45) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:OOAM Rig Release: 9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT i NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 17:30 1.00 CASING P RUNPRD HOLD PJSM ON LD LINER RUNNING BHA. DISCUSS WELL CONTROL CONSIDERATIONS, POSITIONS OF PEOPLE,AND DROPPED OBJECTS POTENTIALS. SET INJECTOR BACK OVER CIRC HOLE ON LEGS. LD LINER RUNNING BHA. "AOGCC REP,BOB NOBLE,WAIVED STATE'S RIGHT TO WITNESS BOPE TEST AT 1505-HRS.** 17:30 - 19:15 1.75 EVAL P OTHCMP PREPARE FLOOR FOR RUNNING CLEANOUT AND LOGGING ASSEMBLY. BAKER LOGGING CREW ON LOCATION TO SWAP OUT ENCODER FOR THEIR LOGGING RUN. COMPLETE ENCODER INSTALLATION. 19:15 - 23:00 3.75 EVAL P OTHCMP PJSM ON MAKING UP CLEANOUT AND LOGGING BHA. MU BHA PER WELL PLAN. PRESSURE TEST QUICK TEST SUB AND MAKE CONNECTION WITH BAKER ENCODER. -CONDUCT KICK WHILE MAKING UP BHA. GREAT CREW RESPONSE. MOTORMAN WAS IN DERRICK; FLOORHAND PICKED UP AND STABBED SAFETY JOINT AND CLOSED FLOOR SAFETY VALVE. FLOORHAND THEN HEADED TO ACCUMULATOR TO CONDUCT DUTIES THAT MOTORMAN WOULD NORMALLY DO,CAUSING ROUSTABOUT TO STEP UP AND MOVE TO CELLAR TO MONITOR BOP FUNCTION. CONDUCTED AAR: ONE IMPROVEMENT QUESTION TO ROUSTABOUT WAS ON WHAT TO LOOK FOR. HE KNOEW TO LOOK FOR RAM FUNCTION BUT WE ALSO DISCUSSED LOOKING FOR MUD OR HYDRAULIC LEAKS AND ESTIMATING SEVERITY OF LEAK BECAUSE THIS WILL ALTER OUR REACTION. GOOD DRILL AND AAR. 23:00 - 00:00 1.00 EVAL P OTHCMP RIH WITH BHA TO 3400'. ADJUST BAKER INSTRUMENTS. CONTINUE TO RIH TO 6200'. UCA COMPRESSIVE STRENGTH OF 500 PSI IN 9 HRS 20 MIN;OKAY TO ENTER LINER TOP AT 2215 HRS. 8/30/2012 00:00 - 04:00 4.00 EVAL P OTHCMP RIH WITH LOGGING BHA. BEGIN LOGGING DOWN AT 60 FPM AT 9150'. NO MOTOR WORK MOVING THROUGH LINER. SET DOWN WITH-12K AT 12,481'UNCORRECTED DEPTH. PROJECTED PBTD FROM LINER RUN IS 12,482'. PICK UP AND RE-CONFIRM TAG. WAIT FOR PERF PILL TO EXIT BIT. LOG UP AT 30 FPM TO 91.50'. 04:00 - 07:30 3.50 EVAL P OTHCMP DROP 1/2"BALL TO OPEN CIRC SUB. PUMP 1-6-VIS KCL PILL AROUND ABOVE PERF PILL TO ASSIST MOVING ANY EXISTING CUTTINGS UP AND OUT OF HOLE. NO INDICATION OF BALL SEATING. SURGE PUMPS UP TO 1.5-BPM AND WORK COIL-NO SUCCESS. POH WITH LOGGING/CLEANOUT BHA. Printed 9/18/2012 8:41:44AM • North America -ALASKA- BP Page 4 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/27/2012 End Date:9/3/2012 X3-0124X-C: (1,429,614.45) Project: Prudhoe Bay ' Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor:NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 07:45 0.25 EVAL P OTHCMP HOLD PJSM ON LD LOGGING/CLEANOUT BHA. REVIEW RISK ASSESSMENT FOR HANDLING 1-1/4"CSH,ORDER OF OPERATIONS,HAZARDS ASSOCIATED WITH STANDING BACK 1-1/4"CSH AND SAFETY JOINT HANDLING. FLOW CHECK WELL-NO FLOW. 07:45 - 10:45 3.00 EVAL P OTHCMP UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE ON LEGS. LD 2-JTS OF PH6&BHA COMPONENTS ABOVE 1-1/4"CSH. STAND BACK 44-STDS OF 1-1/4"CSH. 10:45 - 12:30 1.75 EVAL P OTHCMP HOLD PJSM FINISHING LD CLEANOUT/LOGGING BHA WITH SLB MEMORY LOGGER. DISCUSS SAFE SOURCE HANDLING,THE IMPORTANCE OF GOOD COMMUNICATION OF HAZARDS AND POSITIONS OF PEOPLE. STAND BACK 5 ADDITIONAL STDS OF 1-1/4" CSH. RECOVER 1/2"BALL FROM SHEARED CIRC SUB. REMOVE SOURCE FROM MEMORY LOGGING TOOL&LD REST OF CLEANOUT/LOGGING BHA. 12:30 - 13:00 0.50 EVAL P OTHCMP CONFIRM MCNL/GR/CCL DATA. CLEAN&CLEAR RIG FLOOR. SEND OUT UNUSED LINER JOINTS. 13:00 - 14:00 1.00 EVAL P OTHCMP HOLD PJSM ON BRINGING RPM TOOLS TO RIG FLOOR. SLB MEMORY LOGGER CONFIRMS GOOD DATA FROM MCNL/GR/CCL TOOLS. BRING RPM TOOLS TO RIG FLOOR. 14:00 - 14:30 0.50 EVAL P OTHCMP HOLD PJSM ON MU RPM LOGGING BHA. DISCUSS HANDLING TECHNIQUES, LIMITING PERSONNEL ON THE RIG FLOOR,WELL CONTROL CONSIDERATIONS FOR LOGGING TOOLS&1-1/4"CSH,DERRICK SAFE WORK PRACTICES&RISK ASSESSMENT FOR RUNNING 1-1/4"CSH. 14:30 - 15:00 0.50 EVAL P OTHCMP MU RPM LOGGING TOOLS. 15:00 - 17:15 2.25 EVAL P OTHCMP MU XO FROM RPM LOGGING TOOLS TO 1-1/4" CSH. CONTINUE TO MU RPM LOGGING BHA WITH 1-1/4"CSH FROM DERRICK(50-STDS TOTAL) 17:15 - 17:45 0.50 EVAL P OTHCMP PU INJECTOR. MU COIL TO BHA&STAB ON WELL. TEST QTS TO 250-PSI/3500-PSI. IA/OA/OOA/PVT=0-PSI/198-PSI/20-PSI/ 259-BBLS. 17:45 - 19:40 1.92 EVAL P OTHCMP ESTABLISH CIRCULATION AT.3-BPM/80-PSI. RIH WITH RPM LOGGING BHA. ON DEPTH WITH LOGGING BHA AT 9150'. 19:40 - 20:20 0.67 EVAL P OTHCMP WAIT FOR TOOL TO POWER UP AND THEN WARM UP FOR LOGGING RUN. 20:20 - 23:00 2.67 EVAL P OTHCMP LOG DOWN AT 20 FPM TO PBTD. STOP AT 12,470'. Printed 9/18/2012 8:41:44AM North America-ALASKA- BP Page 5 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/27/2012 End Date: 9/3/2012 X3-0124X-C:(1,429,614.45) Project: Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 23:20 0.33 EVAL P OTHCMP PAUSE WHILE TOOL RE-STARTED FOR LOGGING UP. RECEIVED CORRECTED LOG FROM SLB MCNL ACTIVITY;CORRECTED PBTD IS 12,474.7'. 23:20 - 00:00 0.67 EVAL P OTHCMP BEGIN LOGGING PASS UP AT 10 FPM. PUMP ACROSS THE TOP TO KEEP HOLE FULL FROM DISPLACEMENT. 8/31/2012 00:00 - 05:00 5.00 EVAL P OTHCMP LOG UP WITH BAKER LOGGING TOOL AT 10 FPM TO 9150'. FLOW CHECK,NO FLOW. 05:00 - 07:00 2.00 EVAL P OTHCMP POH WITH LOGGING BHA. 07:00 - 07:30 0.50 EVAL P • OTHCMP FLOW CHECK WELL AT 200'-NO FLOW. HOLD PJSM ON LD BHA&STAND BACK CSH. DISCUSS WELL CONTROL CONSIDERATIONS &MITIGATIONS, PROPER PIPE HANDLING TECHNIQUES,EQUIPMENT INSPECTION AND 'POTENTIAL FOR COMPLACENCY IN REPETITIVE TASKS. 07:30 - 10:00 2.50 EVAL P OTHCMP UNSTAB INJECTOR&SET BACK OVER CIRC HOLE ON LEGS. LD 2-JTS OF 2-3/8"PH6 TO PIPE SHED. STAND BACK 45-STDS OF 1-1/4"CSH. -STOP AT MARKER JT WITH 5-STDS IN WELL. 10:00 - 11:00 1.00 EVAL P OTHCMP HOLD PJSM ON HANDLING BAKER RPM LOGGING TOOLS. DISCUSS RADIATION HAZARDS AND MITIGATIONS(CONTINUOUS MONITORING AND LIMITED ACCESS), ORDER OF OPERATIONS AND TOOL HANDLING. STAND BACK LAST 5-STDS OF 1-1/4"CSH& CLEAR RIG FLOOR. BREAK OUT&LD BAKER RPM TOOLS. 11:00 - 15:00 4.00 ZONISO P OTHCMP RU TO PRESSURE TESTLINER LAP. FI,UID 5= PACK WELL WITH 8.4-PPG KCL ti TEST LINER LAP TO 250-PSI FOR 5-CHARTED �J! MINUTES. LOST 7-PSI OVER 5-MIN INTERVAL. ATTEMPT HIGH PRESSURE TEST TO 2400-PSI FOR 30-CHARTED MINUTES PER HIGH VOLUME TEST CRITERIA. UNABLE TO MEET CRITERIA WITH BEST TEST SHOWING 42-PSI LOSS FOR FIRST 15-MIN AND 38-PSI FOR SECOND 15-MIN. LINER LAP TEST FAILS.. REPORT RESULTS TO WT L 15:00 - 15:30 0.50 ZONISO P OTHCMP RD TEST EQUIPMENT. 15:30 - 16:45 1.25 BOPSUR P OTHCMP PU INJECTOR,MU SWIZZLE STICK&STAB ON WELL. JET STACK AT 1.5-BPM x3. 16:45 - 19:00 2.25 WHSUR P OTHCMP HOLD PJSM ON LEAK-TIGHT BARRIER ISOLATION TESTING. CLOSE SSV. GREASE SWAB VALVE& CLOSE. VAC OUT BOP STACK. RU GAUGE&PRESSURE TRANSDUCER TO WING VALVE TO MONITOR FOR PRESSURE BUILD-UP IN VOID BETWEEN SSV&SWAB. GOOD TEST. 19:00 - 22:45 3.75 BOPSUR P OTHCMP REVIEW BOP INSPECTION PROCEDURE. OPEN RAM DOORS AND INSPECT BOP RAM COMPONENTS AND SEALS. CLOSE UP, SECURE RAMS DOORS. Printed 9/18/2012 8:41:44AM North America-ALASKA- BP Page 6 of 10 Operation Summary Report Common Well Name:C-03 1 AFE No Event Type:COM-ONSHORE(CON) Start Date: 8/27/2012 End Date: 9/3/2012 X3-0124X-C: (1,429,614 45) Project: Prudhoe Bay Site: PB C Pad Rig Name/No NORDIC 1 Spud Date/Time.2/13/1973 12:00.00AM Rig Release. 9/3/2012 Rig Contractor NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:45 - 00:00 1.25 BOPSUR P OTHCMP MOBILIZE TEST JOINTS TO RIG FLOOR. CONDUCT ACCUMULATOR DRAWDOWN TEST;ACTIVATE RAMS FROM COIL TUBING CONSOLE. RECOVERY TO 200 PSI 22 SEC, FULL RECOVERY 88 SEC. FILL STACK AND START BOP PRESSURE TEST;TOURPUSHER, WSL ON SITE TO WITNESS. _ 9/1/2012 00:00 - 12:15 12.25 BOPSUR P OTHCMP TEST BOP EQUIPMENT. TOURPUSHER AND WSL ON LOCATION TO WITNESS. VALVE NUMBER 9 FAILED; REMOVE AND REBUILD BEFORE TESTING CONTINUES. INSTALL VALVE,TEST GOOD. CONTINUE WITH FULL BI-WEEKLY BOPE TEST. AOGCC REP BOB NOBLE WAIVED STATE'S RIGHT TO WITNESS THE TEST. ALL TESTS WITNESSED BY BP WSLS AND NORDIC TOOL OR TOUR PUSHERS. TEST VBRS USING 2-3/8"AND 3-1/2"TEST JTS. TEST COMBI RAMS WITH 2-3/8"TEST JT. TEST LEL&H2S ALARMS-GOOD. BOPE WAS FUNCTION TESTED FROM RIG FLOOR PANEL,OPS CAB&AT ACCUMULATOR UNIT. TEST MANUAL LOCKS ON BLIND RAMS. HOLD AND CHART ALL TEST FOR 5-MINUTES. 12:15 - 13:00 0.75 BOPSUR P OTHCMP PU INJECTOR&MU NOZZLE(OAL=5.1') STAB ON WELL. HOLD PJSM ON TESTING MANUAL RAM LOCKS AGAINST COIL. REVIEW ORDER OF OPERATIONS,WORKING AT HEIGHTS SAFE ,WORK PRACTICES 13:00 - 13:45 0.75 BOPSUR P OTHCMP TEST INNER REEL VALVE&PACKOFF TO 250-PSI/3500-PSI FOR 5-CHARTED MINUTES. GOOD TEST. 13:45 - 16:00 2.25 BOPSUR P OTHCMP RIH TO JUST ABOVE SWAB VALVE. LIGHTLY TAG SWAB AND PU 1/4'. TEST MANUAL LOCKS ON UPPER AND LOWER 2-3/8"COMBI RAMS,2-3/8"X 3-1/2" VBRS AGAINST COIL. HOLD AND CHART EACH TEST FOR 5-MINUTES. ALL TESTS GOOD. 16:00 - 16:45 0.75 WHSUR P OTHCMP OPEN UP WELL TO CLOSED CHOKE. NO PRESSURE ON WELL. FILL WELL WITH.2-BBLS. FLOW CHECK-NO FLOW. UNSTAB INJECTOR AND INSPECT COIL FOR CLOSURE MARKS FROM RAM LOCK TEST- NO DAMAGE. SET INJECTOR BACK OVER CIRC HOLE ON LEGS. 16:45 - 17:15 0.50 PERFOB P OTHCMP RE-INSTALL BHI DEPTH ENCODER ON INJECTOR HEAD. PREP PIPE SHED FOR BRINGING IN PERF GUNS. 17:15 - 17:30 0.25 PERFOB P OTHCMP HOLD PJSM ON LOADING PIPE SHED WITH PERF GUNS. ASSIGN PEOPLE TO POSITIONS, FOCUS ON DROPPED OBJECTS PREVENTION, INSPECTED LIFTING EQUIPMENT,PROPER COMMUNICATION AND EXCLUSION ZONES. Printed 9/18/2012 8:41:44AM • North America -ALASKA- BP Page 7 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/27/2012 End Date: 9/3/2012 'X3-0124X-C: (1,429,614.45) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 20:00 2.50 PERFOB P OTHCMP BRING ON GUNS INTO PIPE SHED. CONDUCT CREW CHANGEOUT AND WALK AROUNDS. CONTINUE LOADING GUNS INTO PIPE SHED. MU SAFETY JOINT FOR RUN. 20:00 - 22:30 2.50 PERFOB P OTHCMP PJSM ON PICKING UP PERFORATION ASSEMBLY AND WELL CONTROL DURING -MAKE UP. MAKE UP ASSEMBLY PER RUNNING ORDER. MU TOTAL OF 79 EACH 2.0",6 SPF GUNS WITH E-FIRE HEAD AND BOTTOM NOSE. 22:30 - 00:00 1.50 PERFOB P OTHCMP PJSM ON MU WORK STRING TO PERFORATION ASSEMBLY. MU BHA. CONDUCT KICK DRILL WHILE MAKING UP WORK STRING. REQUIRED CREW TO MANIPULATE BLOCKS AND SWING THEM AROUND BEFORE PICKING UP SAFETY JOINT. WITH MOTORMAN AND ROUSTABOUT IN DERRICK, FLOORHAND HAD TO STEP UP TO MOTORMAN DUTIES AND SCHLUMBERGER EQUIPMENT OPERATOR HAD TO MOVE TO CELLAR TO MONITOR FUNCTIONS. CREW RESPONSE TIME 2 -MINUTES. CONDUCT AAR. 9/2/2012 00:00 - 02:45 2.75 PERFOB P OTHCMP RIH WITH PERFORATION BHA. WEIGHT ' t FfECK BEFORb I AG:PUW 3$K,WEIGHT RUNNING IN HOLE 15K. TAG AT 12,477' UNCORRECTED PBTD. PICK UP AND RE-TAG AT 12,476'WITH 1.2K DOWN WEIGHT. PICK UP TO NEUTRAL WEIGHT TO 12,470.4'. PICK UP 15',RUN BACK DOWN,TAG,AND PICK UP AGAIN TO NEUTRAL WEIGHT. DEPTH IS 12,470.3'. CORRECT DEPTH TO 12,474.6'ON CTDS FOR MCNL LOG DEPTH CORRECTION OF PBTD. PIT VOLUME 285 BBLS. 02:45 - 04:30 1.75 PERFOB P OTHCMP BRING STRING UP TO 12,472.7'. ESTABLISH PUMP RATES AND RUN PRACTICE CYCLE OF PUMP SEQUENCE FOR FIRING E-HEAD. BEGIN PICKING UP ON LAST CYCLE. POSITIVE INDICATION OF FIRE ON SENSOR, FIRED ON DEPTH AT 12,470'. 2 BBL LOSS ON ✓" FIRING. INCREASE ROH RATE,CLOSE IN CHOKE WHILE BRINGING ON PUMPS. OBTAIN RETURNS THROUGH CHOKE, PINCH IN AND HOLD 180-260 PSI BACK PRESSURE USING PUMP TO CONTROL RATE. POH TO LINER TOP. AVERAGING 4 BPH LOSSES. 04:30 - 05:00 0.50 PERFOB P OTHCMP DOWN ON PUMPS. 30 MINUTE FLOW CHECK WELL AT LINER TOP. 05:00 - 05:30 0.50 PERFOB P OTHCMP CONDUCT KICK DRILL DURING FLOW CHECK. SIMULATE FLOW. CREW RESPONSE WAS TO CLOSE HCR AND FOLLOW STANDING ORDERS. SIMULATED THAT PRESSURE WAS ON WELL,CALLED IN AND DECIDED TO LINE-UP TO MUD GAS SEPARATOR. LINED UP, PUMPED THROUGH MUD GAS SEPARATOR. CONDUCT AAR. GOOD RESPONSE BY CREW. Printed 9/18/2012 8:41:44AM North America-ALASKA- BP Page 8 of 10 Operation Summary Report Common Well Name: C-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/27/2012 End Date:9/3/2012 X3-0124X-C:(1,429,614.45) Project: Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:0701 7'48.375"5 Long: 0148°40'04.275W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 06:45 1.25 PERFOB P OTHCMP POH WITH PERFORATION BHA WHILE CIRCULATING THROUGH MUD GAS SEPARATOR AND HOLDING 100 PSI BACK PRESSURE. EVERYTHING FUNCTIONED WELL. LINE BACK UP TO CIRCULATE THROUGH NORMAL PATH. LOSS RATE --AVERAGING 8 BPH. CONTINUE TO POH HOLDING 150-165 PSI BACKPRESSURE. LOSSES SLOWED TO 2 BPH. 06:45 - 07:45 1.00 PERFOB P OTHCMP 30 MINUTE FLOW CHECK AT SURFACE. CONDUCT CREW CHANGE OUTS AND WALK AROUND. 07:45 - 08:15 0.50 PERFOB P OTHCMP HOLD PJSM ON STAND BACK CSH. DISCUSS POSITIONS OF PEOPLE, DROPPED OBJECTS POTENTIAL,HAZARDS ASSOCIATED WITH RACKING PIPE IN DERRICK AND FLUSHING 1-1/4"CSH WITH FRESH WATER. 08:15 - 10:15 2.00 PERFOB P 'OTHCMP UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE ON LEGS. LD 2-JTS OF 2-3/8"PH6. HOLD KWT DRILL WITH CSH. WALK ROUSTABOUT THROUGH THE PROCESS 'STEP BY STEP,PAUSING TO DISCUSS. FLUSH 1-1/4"CSH WITH 5-BBLS FRESH FRESH WATER. 10:15 - 11:15 1.00 PERFOB P OTHCMP POH, STANDING BACK 20-STDS OF 1-1/4"CSH IN DERRICK. LOST 1.5-BBLS FLUID ABOVE DISPLACEMENT DURING TRIP. 11:15 - 11:45 0.50 PERFOB P OTHCMP HOLD PJSM ON LD PERF GUNS. DISCUSS POSITIONS OF PEOPLE,SAFETY JOINT HANDLING&WELL CONTROL CONSIDERATIONS,HANDLING OF SPENT GUNS AND PROPER PPE. 11:45 - 15:30 3.75 PERFOB P ' OTHCMP STAND BACK LAST 5-STDS OF 1-1/4"CSH. RU PERF GUN HANDLING EQUIPMENT. LD 40-PERF GUNS TO PIPE SHED. 15:30 - 16:00 0.50 PERFOB P OTHCMP HOLD KICK WHILE TRIPPING PERF GUNS DRILL.THE CREW REPSONSED WELL. HELPED NEW PERF HAND WITH UNDERSTANDING STEPS IN THE DRILL. FOLLOWED WITH AAR WHERE IT WAS DISCUSSED TO HAVE ADDITIONAL SAFETY JOINT FOR BOTH CSH AND PERF GUNS READY BEFORE JOB. 16:00 - 17:45 1.75 PERFOB P OTHCMP CONT TO LD PERF GUNS. 17:45 - 19:15 1.50 PERFOB P OTHCMP RD RIG FLOOR EQUIPMENT FOR RUNNING GUNS. LOWER SLB HANDLING EQUIPMENT DOWN BEAVER SLIDE. 19:15 - 19:45 0.50 WHSUR P POST RIG CREW CHANGEOUT,WALK AROUND. 19:45 - 20:30 0.75 WHSUR P POST PJSM ON FREEZE PROTECTING WELL. MU FREEZE PROTECT NOZZLE BHA. STAB ON, PRESSURE TEST QUICK TEST SUB. 20:30 - 21:00 0.50 WHSUR P POST RIH WITH NOZZLE BHA. PUMP DIESEL TO THE BIT. 21:00 - 21:30 0.50 WHSUR P POST FREEZE PROTECT WELL TO 2500'WITH 40 BBLS DIESEL. Printed 9/18/2012 8:41:44AM North America -ALASKA- BP Page 9 of 10 Operation Summary Report Common Well Name:C-03 AFE No Event Type: COM-ONSHORE(CON) Start Date: 8/27/2012 End Date:9/3/2012 rX3-0124X-C: (1,429,614.45) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release:9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275'W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 22:00 0.50 WHSUR P POST POP OFF, LD NOZZLE ASSEMBLY. CLEAR AND CLEAN RIG FLOOR. GREASE TREE VALVES. PJSM ON SETTING BPV. 22:00 - 22:30 0.50 WHSUR P POST SET BPV. CONDUCT PRESSURE TEST AND LEAK TIGHT TEST AGAINST SWAB VALVE AND SSV PER CRITERIA IN WELL PLAN FOR —CONFIRMING BARRIERS TO WELL. GOOD TEST. N2 CREW ON LOCATION, RIGGING THEM UP FOR BLOWDOWN. INFORMED THAT THEY DO NOT HAVE RETAINING STRAPS FOR HARD IRON-TOLD THEM WE WILL WAIT FOR DELIVERY OF STRAPS BEFORE JOB PROCEEDS. CLEAN PITS. 22:30 - 00:00 1.50 DEMOB P POST PUMP FRESH WATER AHEAD AND FILL COIL WITH 5 BBLS METHANOL IN PREPARATION FOR NITROGEN BLOWDOWN. PJSM ON RIGGING UP HARD IRON FOR PUMPING UNIT. STRAPS ON LOCATION, RIG UP UNIT. CONTINUE CLEANING PITS. 9/3/2012 00:00 - 00:30 0.50 DEMOB P POST COOL DOWN NITROGEN UNIT. PJSM WITH SLB,CREW, SITE CONTROL, REGARDING PUMPING NITROGEN. COVER MITIGATION FOR PINHOLE LEAK, NITROGEN INSIDE RIG, ANY LEAKING CONNECTIONS, HIGH PRESSURE. 00:30 - 01:00 0.50 DEMOB P POST MU NOZZLE ASSEMBLY,STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB. SLB UNIT PRESSURE TESTING LINES UP TO RIG TO 250 PSI LOW/4000 PSI HIGH. BOTH PRESSURE TESTS GOOD. MAKE FINAL WALK THROUGH TO INSPECT LINES. 01:00 - 02:00 1.00 DEMOB P POST BLOW DOWN REEL,TAKE RETURNS TO TIGER TANK. SHUT DOWN PUMPING UNIT, MONITOR REEL AND TIGER TANK WHILE PRESSURES DIMINISH. PJSM ON POPPING INJECTOR OFF AND PULLING COIL ACROSS WITH GRAPPLE. 02:00 - 04:30 2.50 DEMOB P POST POP OFF. BREAK OFF NOZZLE BHA AND COIL CONNECTOR. PREP FOR GRAPPLE. INSTALL GRAPPLE,BREAK OFF ALLEN NUT. BREAK OFF GRAPPLE,RE-INSTALL ANOTHER GRAPPLE. PULL TEST GRAPPLE. PULL BACK TO REEL HOUSE. SECURE TO REEL. 04:30 - 05:15 0.75 DEMOB P POST KNOCK OFF HARD IRON IN REEL HOUSE. STAGE TRUCKING IN PREPARATION FOR LOWERING REEL. CLEAR AND CLEAN RIG FLOOR. PREP FOR ND OF BOP. 05:15 - 06:15 1.00 DEMOB P POST PJSM ON LOWERING REEL WITH CH2 CREW, NORDIC CREW,SLB CREW,SITE CONTROL. LOWER REEL. 06:15 - 06:45 0.50 DEMOB P POST CREW CHANGEOUT 06:45 - 09:00 2.25 DEMOB P POST SEND OUT BTT TOOLS. CTS BEGIN OIL CHANGE ON REEL DRIVE MOTOR. 09:00 - 09:30 0.50 DEMOB P POST HOLD PJSM ON ND BOP STACK. REVIEW PROPER PERMITTING, HAMMER WRENCH USAGE SAFETY,WORKING AT HEIGHTS, RESTRICTING CELLAR ACCESS AND PROPER PPE FOR THE JOB. Printed 9/18/2012 8.41:44AM North America -ALASKA- BP � �� Page 10 ofMI Operation Summary Report Common Well Name: C-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/27/2012 End Date:9/3/2012 X3-0124X-C: (1,429,614.45) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/13/1973 12:00:00AM Rig Release: 9/3/2012 Rig Contractor: NORDIC CALISTA UWI:/Lat:070°17'48.375"5 Long: 0148°40'04.275"W Active Datum:ORIG KELLY BUSHING @54.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (ft) _ 09:30 - 11:00 1.50 BOPSUR P POST ND BOP.TWO BARRIERS=LEAK TIGHT TESTED SWAB AND SSV 11:00 - 12:00 1.00 WHSUR P POST NU TREE CAP. 12:00 - 12:30 0.50 WHSUR P POST HOLD PJSM ON PRESSURE TEST CAP. REVIEW LINE UP,WORKING WITH PRESSURE, RESTRICTING CELLAR ACCESS, PROPER PPE. 12:30 - 13:30 1.00 WHSUR P POST PRESSURE TEST TREE CAP LOW 250PSI AND HIGH 3500PSI. HOLD AND CHART EACH TEST FOR 5 MINS.GOOD TESTS. 13:30 - 14:00 0.50 WHSUR P POST HOLD COMBO SPILL!FIRE TABLETOP DRILL WITH BROWNE'S CREW. REVIEW EMERGENCY RESPONSE PLAN AND ACTIONS WITH NEW ROUSTABOUT ON CREW. HIGHLIGHT FIREFIGHTING DOES NOT TAKE PLACE ONCE THE FIRE IS PAST INCIPIENT STAGE. DISCUSS LOCATION OF EMERGENCY RESPONSE EQUIPMENT ON LOCATION(EXTINGUISHERS, FIRE DEPT TIE IN PT,SPILL CONNEX) 14:00 - 15:00 1.00 WHSUR P POST PERFORM CREW CHANGE. OPEN TREE VALVES&FILL TREE WITH MEOH. CLOSE ALL TREE VALVES&SECURE WELL. RD PRESSURE SENSORS ON IA/OA/OOA. FINAL PRESSURES=0-PSI/160-PSI/0-PSI. 15:00 - 16:00 1.00 WHSUR P POST FINISH RD RIG EQUIPMENT. CLEAN&SECURE CELLAR. RELEASE RIG AT 1600-HRS. CONTINUE WITH PREP TO MOVE OFF WELL AND POSITION TO MOVE ONTO C-24. Printed 9/18/2012 8:41:44AM C-03C, Well History (Post Rig Sidetrack) Date Summary 09/09/12 T/I/O=Vac/0/0 Conducted PJSM.With all valves open, ensured 0 psi at tree cap.Torqued all flanges to specs. (see log) Performed LTT on Swab& SSV thru tree cap 3500/5 min. pass. Removed tree cap, attached lubricator, PT'd 250/Iow..3500/high 5 min. pass. PULLED 4" CIW"H" BPV#253 using 1-1'ext. Tagged @ 114"CIO tools, re-attached lubricator with CIW"H"TWC. PT'd 250/Iow..3500/high..5 min. pass. Set TWC. Removed lubricator, C/O tools, re-attached lubricator, Shell tested tree against TWC 250/Iow..5000/high 5 min. pass.(see TRP folder) Pulled TWC. 09/10/12 T/I/O=0/0/180. Conduct PJSM. Barriers=OA valve. Cycled OA(13 turns), bled off pressure and performed LTT for 5 min. (passed). Removed piggy back OA valve and installed tapped blind flange. Torqued to API specs(7/8" L7M 243ft. lbs.). Ptd.flange against OA gate to 2500 psi. for 5 min. (passed). Performed same steps as above for OA valve on other side, (passed).All tests charted and documented in QC reports field charted tests. 09/29/12 DRIFTED W/10'x 3.70" DMY WHPSTCK W/3.75" LIB ON BTM TO 9460'SLM, OBTAINED V IMPRESSION OF POSSIBLE RIG TRASH ON LIB. DRIFTED W/3.74"CENT, 2'x 1-7/8"STEM,3.78" CENT, 3.75" LIB.TAGGED DEPLOY SLV @ 9493'SLM (9503' MD). SET 45 KB LNR TOP PACKER ON V TOP OF DEPLOYMENT SLEEVE @ 9495'MD. SET 4-1/2"LTTP @ IN KB PACKER @ 9479'SLM, LRS PERFORMED PASSING MIT-T TO 2400 PSI. 09/29/12 T/I/O=237/0/119 SI Assist SL with Load and Test MITT 2400 psi***PASSED***(CTD) Loaded tubing with 5 bbls meth followed by 15 bbls crude. Standby for S-Line to set plug. Pressured up to TBG with 3.5 /( bbls crude to 2400 psi for MIT T. 15 min loss of 73 psi, 30 min loss of 28 psi,for a total loss of 101 psi. 09/30/12 PULLED 4-1/2"LTTP FROM KB PACKER @ 9479' SLM. Page 1 of 1 P.■ BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB C Pad C-03 - Slot 03 / Lat: 070°17'48.375"5 Long: 0148°40'04.275"W C-03CPB1 Survey: MWD Survey Report - Geographic 10 September, 2012 I0 Iby Irri ill BAKER Nor HUGHES Survey Report-Geographic ,Il bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)©63.66ft(63.66(35.16+28.5; Site: PB C Pad MD Reference: 63.66(35.16+28.5)©63.66ft(63.66(35.16+28.5; Well: C-03 North Reference: True Wellbore: C-03CPB1 Survey Calculation Method: Minimum Curvature Design: C-03CPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB C Pad,TR-11-14 Site Position: Northing: 5,957,218.72ft Latitude: 70°17'22.367 N' From: Map Easting: 662,550.03ft Longitude: 148°41'2.797 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well C-03 API No 500292012400 Well Position +N/-S 0.00 ft Northing: 5,959,906.00 ft Latitude: 70°17'48.375 N +E/-W 0.00 ft Easting: 664,500.00 ft Longitude: 148°40'4.275 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 35.50 ft Wellbore C-03CPB1 API No 500292012470 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 8/15/2012 20.87 81.04 57,655 Design C-03CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,594.32 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 28.50 0.00 0.00 62.20 Survey Program Date: 8/21/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 109.20 8,189.20 C-03(GyroData)(C-03) GYD-CT-CMS Gyrodata cont.casing m/s 8,202.00 9,594.32 C-03B IIFR(C-03B) MWD+IFR+MS MWD+IFR+Multi Station 9,615.00 10,758.00 MWD(C-03CPB1) MWD MWD-Standard 9/10/2012 2:31:52PM Page 2 COMPASS 2003.16 Build 73 BAKER �� HUGHES Survey Report-Geographic -00 0. INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Well: C-03 North Reference: True Wellbore: C-03CPB1 Survey Calculation Method: Minimum Curvature Design: C-03CPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,594.32 7.87 113.65 8,536.65 2,069.71 2,797.93 5,962,036.31 667,251.77 70°18'8.725 N 148°38'42.697 W TIP 9,615.00 8.31 135.84 8,557.13 2,068.07 2,800.27 5,962,034.72 667,254.14 70°18'8.709 N 148°38'42.629 W KOP 9,621.00 8.65 134.01 8,563.07 2,067.44 2,800.90 5,962,034.11 667,254.78 70°18'8.703 N 148°38'42.610 W 9,661.45 10.89 125.58 8,602.93 2,063.11 2,806.20 5,962,029.89 667,260.17 70°18'8.660 N 148°38'42.456 W 9,691.51 13.69 121.87 8,632.30 2,059.57 2,811.53 5,962,026.47 667,265.58 70° 18'8.626 N 148°38'42.301 W 9,733.57 18.05 118.45 8,672.75 2,053.84 2,821.49 5,962,020.96 667,275.66 70° 18'8.569 N 148°38'42.010 W 9,763.63 21.39 116.74 8,701.04 2,049.15 2,830.48 5,962,016.47 667,284.76 70° 18'8.523 N 148°38'41.748 W 9,790.84 23.80 115.51 8,726.16 2,044.56 2,839.87 5,962,012.08 667,294.24 70° 18'8.478 N 148°38'41.474 W 9,821.63 26.93 114.38 8,753.98 2,039.00 2,851.83 5,962,006.79 667,306.32 70° 18'8.423 N 148°38'41.126 W 9,850.55 29.76 115.89 8,779.43 2,033.16 2,864.25 5,962,001.22 667,318.87 70°18'8.366 N 148°38'40.764 W 9,880.97 32.86 115.87 8,805.41 2,026.26 2,878.48 5,961,994.64 667,333.24 70°18'8.298 N 148°38'40.349 W 9,901.75 34.81 115.45 8,822.67 2,021.25 2,888.90 5,961,989.86 667,343.77 70°18'8.248 N 148°38'40.045 W 9,941.68 39.84 113.63 8,854.42 2,011.22 2,910.93 5,961,980.31 667,366.01 70°18'8.150 N 148°38'39.403 W 9,971.87 44.06 111.98 8,876.87 2,003.41 2,929.53 5,961,972.91 667,384.78 70°18'8.073 N 148°38'38.861 W 9,996.84 47.01 109.99 8,894.36 1,997.04 2,946.17 5,961,966.91 667,401.55 70°18'8.010 N 148°38'38.376 W 10,000.00 47.40 109.60 8,896.50 1,996.25 2,948.35 5,961,966.17 667,403.75 70°18'8.002 N 148°38'38.312 W 10,028.17 50.89 106.36 8,914.93 1,989.69 2,968.61 5,961,960.05 667,424.15 70°18'7.938 N 148°38'37.721 W 10,058.32 53.73 102.11 8,933.37 1,983.85 2,991.73 5,961,954.71 667,447.39 70°18'7.880 N 148°38'37.047 W 10,086.49 55.39 102.87 8,949.70 1,978.88 3,014.14 5,961,950.24 667,469.90 70°18'7.831 N 148°38'36.394 W 10,116.94 58.95 106.24 8,966.21 1,972.44 3,038.89 5,961,944.34 667,494.78 70°18'7.768 N 148°38'35.673 W 10,146.31 62.27 109.23 8,980.63 1,964.64 3,063.25 5,961,937.08 667,519.31 70°18'7.691 N 148°38'34.962 W 10,177.98 66.62 114.81 8,994.29 1,953.91 3,089.71 5,961,926.93 667,545.99 70° 18'7.585 N 148°38'34.191 W 10,205.62 69.98 116.93 9,004.51 1,942.70 3,112.81 5,961,916.23 667,569.33 70° 18'7.475 N 148°38'33.518 W 10,237.69 74.64 118.11 9,014.25 1,928.58 3,139.90 5,961,902.71 667,596.72 70° 18'7.336 N 148°38'32.728 W 10,266.40 78.99 115.72 9,020.80 1,915.94 3,164.82 5,961,890.62 667,621.91 70°18'7.211 N 148°38'32.002 W 10,297.11 83.09 114.91 9,025.58 1,902.97 3,192.23 5,961,878.25 667,649.60 70°18'7.084 N 148°38'31.203 W 10,325.87 88.80 112.28 9,027.62 1,891.50 3,218.51 5,961,867.36 667,676.12 70°18'6.971 N 148°38'30.437 W 10,357.02 91.75 109.79 9,027.47 1,880.32 3,247.58 5,961,856.82 667,705.42 70°18'6.861 N 148°38'29.589 W 10,384.47 95.09 108.31 9,025.83 1,871.38 3,273.48 5,961,848.44 667,731.51 70°18'6.773 N 148°38'28.834 W 10,416.73 92.73 103.18 9,023.63 1,862.65 3,304.44 5,961,840.40 667,762.65 70°18'6.687 N 148°38'27.932 W 10,446.91 93.04 100.72 9,022.11 1,856.41 3,333.93 5,961,834.80 667,792.27 70°18'6.625 N 148°38'27.072 W 10,480.73 94.09 95.83 9,020.01 1,851.55 3,367.32 5,961,830.68 667,825.75 70°18'6.577 N 148°38'26.098 W 10,515.17 93.60 90.14 9,017.69 1,849.76 3,401.62 5,961,829.64 667,860.08 70°18'6.560 N 148°38'25.098 W 10,547.37 95.53 86.12 9,015.13 1,850.81 3,433.69 5,961,831.39 667,892.12 70° 18'6.570 N 148°38'24.163 W 10,587.37 92.09 79.04 9,012.47 1,855.96 3,473.24 5,961,837.41 667,931.54 70° 18'6.620 N 148°38'23.010 W 10,616.94 91.04 73.63 9,011.66 1,862.94 3,501.95 5,961,845.01 667,960.09 70°18'6.689 N 148°38'22.173 W 10,647.07 96.46 71.58 9,009.69 1,871.93 3,530.63 5,961,854.62 667,988.57 70°18'6.777 N 148°38'21.337 W 10,678.14 100.94 69.09 9,004.99 1,882.25 3,559.54 5,961,865.58 668,017.24 70°18'6.878 N 148°38'20.494 W 10,707.64 100.75 65.33 8,999.44 1,893.48 3,586.25 5,961,877.38 668,043.70 70°18'6.989 N 148°38'19.715 W 10,758.00 100.75 65.33 8,990.05 1,914.13 3,631.21 5,961,899.01 668,088.19 70° 18'7.192 N 148°38'18.404 W TD 9/10/2012 2:31:52PM Page 3 COMPASS 2003.16 Build 73 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB C Pad C-03 - Slot 03 / Lat: 070°17'48.375"5 Long: 0148°40'04.275"W C-03C Survey: MWD Survey Report - Geographic 10 September, 2012 Mill .4400 HUGHES Survey Report-Geographic4. °i) INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Well: C-03 North Reference: True Wellbore: C-03C Survey Calculation Method: Minimum Curvature Design: C-03C Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PBC Pad,TR-11-14 Site Position: Northing: 5,957,218.72ft Latitude: 70°17'22.367 N From: Map Easting: 662,550.03ft Longitude: 148°41'2.797 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.24 ° Well C-03 API No 500292012400 Well Position +N/-S 0.00 ft Northing: 5,959,906.00 ft Latitude: 70°17'48.375 N +E/-W 0.00 ft Easting: 664,500.00 ft Longitude: 148°40'4.275 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 35.50ft Wellbore C-03C API No 500292012403 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 8/15/2012 20.86 81.02 57,635 Design C-03C Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,996.84 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 28.50 0.00 0.00 110.00 Survey Program Date: 8/29/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 109.20 8,189.20 C-03(GyroData)(C-03) GYD-CT-CMS Gyrodata cont.casing m/s 8,202.00 9,594.32 C-03B IIFR(C-03B) MWD+IFR+MS MWD+IFR+Multi Station 9,615.00 9,996.84 MWD(C-03CPB1) MWD MWD-Standard 10,000.00 12,515.00 MWD(C-03C) MWD MWD-Standard 9/10/2012 2:37:49PM Page 2 COMPASS 2003.16 Build 73 irg BAKER `' HUGHES Survey Report-Geographic bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Well: C-03 North Reference: True Wellbore: C-03C Survey Calculation Method: Minimum Curvature Design: C-03C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,996.84 47.01 109.99 8,894.36 1,997.04 2,946.17 5,961,966.91 667,401.55 70°18'8.010 N 148°38'38.376 W TIP 10,000.00 47.50 109.63 8,896.50 1,996.25 2,948.35 5,961,966.17 667,403.75 70°18'8.002 N 148°38'38.312 W KOP 10,033.33 49.55 115.30 8,918.58 1,986.70 2,971.40 5,961,957.12 667,427.00 70°18'7.908 N 148°38'37.640 W 10,060.29 52.56 115.54 8,935.53 1,977.70 2,990.34 5,961,948.54 667,446.13 70°18'7.820 N 148°38'37.088 W 10,090.87 57.20 114.17 8,953.12 1,967.20 3,013.03 5,961,938.54 667,469.04 70°18'7.716 N 148°38'36.427 W 10,120.56 61.87 112.75 8,968.17 1,957.02 3,036.50 5,961,928.88 667,492.73 70°18'7.616 N 148°38'35.742 W 10,150.42 66.45 112.01 8,981.18 1,946.79 3,061.35 5,961,919.20 667,517.79 70°18'7.515 N 148°38'35.018 W 10,181.11 70.92 111.59 8,992.33 1,936.18 3,087.89 5,961,909.17 667,544.56 70°18'7.411 N 148°38'34.244 W 10,210.70 75.42 111.08 9,000.90 1,925.88 3,114.26 5,961,899.45 667,571.15 70°18'7.309 N 148°38'33.476 W 10,240.41 79.68 110.89 9,007.30 1,915.49 3,141.34 5,961,889.66 667,598.45 70°18'7.207 N 148°38'32.686 W 10,270.81 86.16 113.54 9,011.05 1,904.09 3,169.25 5,961,878.87 667,626.60 70°18'7.095 N 148°38'31.873 W 10,300.35 90.34 111.08 9,011.95 1,892.88 3,196.56 5,961,868.26 667,654.14 70°18'6.985 N 148°38'31.077 W 10,332.39 90.52 108.27 9,011.71 1,882.10 3,226.73 5,961,858.14 667,684.54 70°18'6.878 N 148°38'30.197 W 10,362.49 91.01 105.53 9,011.31 1,873.35 3,255.52 5,961,850.02 667,713.51 70°18'6.792 N 148°38'29.358 W 10,392.53 92.15 103.08 9,010.48 1,865.93 3,284.62 5,961,843.24 667,742.76 70°18'6.719 N 148°38'28.510 W 10,423.22 91.17 100.78 9,009.59 1,859.59 3,314.63 5,961,837.56 667,772.90 70°18'6.657 N 148°38'27.635 W 1 10,462.67 90.06 97.55 9,009.16 1,853.31 3,353.57 5,961,832.13 667,811.97 70°18'6.595 N 148°38'26.499 W 10,492.12 89.51 94.31 9,009.27 1,850.27 3,382.86 5,961,829.73 667,841.31 70°18'6.565 N 148°38'25.646 W 10,527.43 93.56 92.92 9,008.33 1,848.04 3,418.07 5,961,828.28 667,876.57 70°18'6.543 N 148°38'24.619 W 10,557.66 92.03 89.56 9,006.85 1,847.39 3,448.26 5,961,828.29 667,906.76 70°18'6.536 N 148°38'23.739 W 10,587.10 92.89 86.01 9,005.59 1,848.52 3,477.64 5,961,830.07 667,936.11 70°18'6.547 N 148°38'22.882 W 10,618.67 90.89 81.96 9,004.55 1,851.83 3,509.01 5,961,834.06 667,967.40 70°18'6.579 N 148°38'21.967 W 10,649.89 91.14 77.64 9,004.00 1,857.36 3,539.73 5,961,840.26 667,997.98 70°18'6.634 N 148°38'21.072 W 10,680.21 88.86 72.91 9,004.00 1,865.06 3,569.04 5,961,848.60 668,027.12 70°18'6.709 N 148°38'20.217 W 10,710.49 88.90 69.40 9,004.59 1,874.84 3,597.69 5,961,859.00 668,055.54 70°18'6.805 N 148°38'19.382 W 10,741.67 88.93 65.30 9,005.18 1,886.84 3,626.45 5,961,871.63 668,084.03 70°18'6.923 N 148°38'18.543 W 10,770.22 88.68 61.90 9,005.77 1,899.53 3,652.02 5,961,884.87 668,109.31 70°18'7.048 N 148°38'17.797 W 10,800.67 88.80 58.37 9,006.44 1,914.69 3,678.41 5,961,900.60 668,135.37 70°18'7.197 N 148°38'17.028 W 10,830.37 88.16 62.46 9,007.23 1,929.34 3,704.22 5,961,915.82 668,160.85 70°18'7.341 N 148°38'16.275 W' 10,860.27 89.11 66.43 9,007.94 1,942.23 3,731.19 5,961,929.30 668,187.52 70° 18'7.468 N 148°38'15.488 W 10,890.38 91.07 70.62 9,007.90 1,953.25 3,759.20 5,961,940.93 668,215.29 70°18'7.576 N 148°38'14.672 W 10,920.21 91.66 77.06 9,007.19 1,961.55 3,787.83 5,961,949.85 668,243.72 70°18'7.657 N 148°38'13.837 W 10,950.99 91.17 84.10 9,006.42 1,966.58 3,818.16 5,961,955.54 668,273.94 70°18'7.707 N 148°38'12.952 W 10,981.74 93.44 87.07 9,005.19 1,968.95 3,848.79 5,961,958.58 668,304.51 70° 18'7.730 N 148°38'12.059 W 11,010.63 90.74 88.66 9,004.13 1,970.02 3,877.64 5,961,960.28 668,333.32 70° 18'7.740 N 148°38'11.218 W 11,043.88 92.15 91.40 9,003.30 1,970.01 3,910.87 5,961,960.99 668,366.55 70°18'7.740 N 148°38'10.249 W 11,077.69 93.35 96.37 9,001.67 1,967.72 3,944.56 5,961,959.45 668,400.27 70°18'7.717 N 148°38'9.267 W 11,115.87 91.04 101.68 9,000.21 1,961.74 3,982.22 5,961,954.29 668,438.05 70°18'7.658 N 148°38'8.169 W 11,144.84 90.89 104.38 8,999.72 1,955.21 4,010.44 5,961,948.38 668,466.40 70°18'7.594 N 148°38'7.346 W 11,173.97 96.58 111.00 8,997.82 1,946.39 4,038.10 5,961,940.17 668,494.26 70°18'7.507 N 148°38'6.540 W' 11,201.90 90.67 110.59 8,996.06 1,936.50 4,064.15 5,961,930.85 668,520.51 70°18'7.409 N 148°38'5.781 W 11,233.23 91.14 109.16 8,995.56 1,925.85 4,093.61 5,961,920.85 668,550.20 70° 18'7.305 N 148°38'4.922 W 11,264.17 92.89 106.17 8,994.47 1,916.46 4,123.07 5,961,912.11 668,579.85 70° 18'7.212 N 148°38'4.063 W 11,295.61 92.74 103.31 8,992.93 1,908.48 4,153.43 5,961,904.79 668,610.38 70° 18'7.133 N 148°38'3.178 W 11,325.85 92.33 100.11 8,991.59 1,902.34 4,183.01 5,961,899.31 668,640.08 70° 18'7.073 N 148°38'2.316 W 11,355.68 91.87 95.37 8,990.50 1,898.33 4,212.54 5,961,895.94 668,669.69 70° 18'7.033 N 148°38'1.455 W 11,386.14 93.01 93.03 8,989.20 1,896.10 4,242.89 5,961,894.38 668,700.08 70°18'7.011 N 148°38'0.570 W 11,416.27 91.63 90.51 8,987.98 1,895.17 4,272.98 5,961,894.11 668,730.18 70°18'7.002 N 148°37'59.693 W 11,445.52 91.38 88.13 8,987.21 1,895.52 4,302.21 5,961,895.10 668,759.40 70° 18'7.005 N 148°37'58.840 W 11,475.55 91.53 88.41 8,986.45 1,896.43 4,332.22 5,961,896.66 668,789.37 70° 18'7.014 N 148°37'57.966 W 11,505.33 90.12 93.65 8,986.02 1,895.89 4,361.98 5,961,896.78 668,819.14 70° 18'7.008 N 148°37'57.098 W 11,535.65 88.07 99.17 8,986.50 1,892.51 4,392.09 5,961,894.05 668,849.32 70° 18'6.975 N 148°37'56.220 W 11,567.95 88.62 104.26 8,987.43 1,885.95 4,423.70 5,961,888.19 668,881.05 70°18'6.910 N 148°37'55.299 W 9/10/2012 2:37:49PM Page 3 COMPASS 2003.16 Build 73 BHY NES Survey Report-Geographic ai) INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5; Well: C-03 North Reference: True Wellbore: C-03C Survey Calculation Method: Minimum Curvature Design: C-03C Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,596.27 87.45 107.16 8,988.41 1,878.29 4,450.94 5,961,881.13 668,908.46 70° 18'6.835 N 148°37'54.504 W 11,631.54 92.92 114.31 8,988.29 1,865.82 4,483.89 5,961,869.38 668,941.67 70°18'6.712 N 148°37'53.544 W 11,661.57 89.20 118.93 8,987.74 1,852.37 4,510.72 5,961,856.52 668,968.79 70°18'6.580 N 148°37'52.762 W 11,690.07 89.54 125.31 8,988.05 1,837.23 4,534.85 5,961,841.91 668,993.23 70°18'6.430 N 148°37'52.059 W 11,722.95 89.33 130.43 8,988.37 1,817.05 4,560.79 5,961,822.31 669,019.61 70°18'6.232 N 148°37'51.303 W 11,752.59 88.56 128.68 8,988.92 1,798.18 4,583.64 5,961,803.94 669,042.87 70°18'6.046 N 148°37'50.637 W 11,785.75 88.90 127.15 8,989.65 1,777.81 4,609.79 5,961,784.15 669,069.46 70°18'5.846 N 148°37'49.875 W 11,822.13 86.72 123.50 8,991.05 1,756.79 4,639.45 5,961,763.79 669,099.56 70°18'5.639 N 148°37'49.011 W 11,859.89 88.25 117.88 8,992.70 1,737.55 4,671.87 5,961,745.26 669,132.40 70°18'5.449 N 148°37'48.066 W 11,883.45 88.74 115.38 8,993.32 1,726.99 4,692.92 5,961,735.17 669,153.68 70°18'5.345 N 148°37'47.452 W 11,910.39 89.72 113.33 8,993.68 1,715.88 4,717.46 5,961,724.60 669,178.45 70°18'5.236 N 148°37'46.737 W 11,940.75 93.93 112.39 8,992.72 1,704.10 4,745.42 5,961,713.43 669,206.65 70° 18'5.120 N 148°37'45.922 W 11,970.86 96.77 107.07 8,989.91 1,693.98 4,773.62 5,961,703.93 669,235.07 70° 18'5.020 N 148°37'45.100 W 12,000.41 97.39 101.51 8,986.26 1,686.74 4,802.03 5,961,697.32 669,263.63 70° 18'4.949 N 148°37'44.272 W 12,031.29 96.74 97.28 8,982.46 1,681.74 4,832.25 5,961,692.98 669,293.95 70° 18'4.899 N 148°37'43.391 W 12,060.25 96.46 92.72 8,979.13 1,679.24 4,860.91 5,961,691.11 669,322.65 70° 18'4.875 N 148°37'42.555 W 12,090.53 95.47 89.25 8,975.99 1,678.72 4,891.01 5,961,691.25 669,352.76 70° 18'4.869 N 148°37'41.678 W 12,120.82 95.44 84.16 8,973.10 1,680.45 4,921.11 5,961,693.64 669,382.81 70° 18'4.886 N 148°37'40.800 W 12,145.68 96.86 77.56 8,970.44 1,684.37 4,945.49 5,961,698.09 669,407.10 70°18'4.925 N 148°37'40.089 W 12,176.06 98.26 71.66 8,966.44 1,692.36 4,974.52 5,961,706.71 669,435.94 70°18'5.003 N 148°37'39.243 W 12,205.85 97.94 66.65 8,962.24 1,702.85 5,002.07 5,961,717.80 669,463.25 70°18'5.106 N 148°37'38.439 W 12,235.95 97.32 62.78 8,958.24 1,715.59 5,029.04 5,961,731.13 669,489.94 70°18'5.231 N 148°37'37.653 W 12,265.25 95.62 59.13 8,954.94 1,729.72 5,054.49 5,961,745.82 669,515.07 70°18'5.370 N 148°37'36.911 W 12,295.99 94.45 61.31 8,952.24 1,744.93 5,081.06 5,961,761.60 669,541.30 70°18'5.519 N 148°37'36.136 W 12,325.72 96.15 67.52 8,949.49 1,757.71 5,107.75 5,961,774.96 669,567.70 70°18'5.645 N 148°37'35.357 W 12,356.17 97.54 73.58 8,945.86 1,767.77 5,136.24 5,961,785.64 669,595.96 70°18'5.744 N 148°37'34.526 W 12,385.94 96.15 79.23 8,942.31 1,774.72 5,164.96 5,961,793.21 669,624.52 70°18'5.812 N 148°37'33.689 W 12,415.98 95.41 81.82 8,939.28 1,779.64 5,194.43 5,961,798.78 669,653.88 70°18'5.860 N 148°37'32.829 W 12,445.91 92.33 84.71 8,937.26 1,783.14 5,224.08 5,961,802.92 669,683.44 70°18'5.894 N 148°37'31.965 W 12,515.00 92.33 84.71 8,934.45 1,789.50 5,292.82 5,961,810.79 669,752.02 70°18'5.956 N 148°37'29.961 W TD 9/10/2012 2:37:49PM Page 4 COMPASS 2003.16 Build 73 riTi (F) rEk i 4=-, = j J SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-03C BP Exploration (Alaska), Inc. Permit No: 212-058 Surface Location: 1316' FNL, 879' FEL, SEC. 19, T11N, R14E, UM Bottomhole Location: 315' FSL, 4485' FWL, SEC. 17, Ti1 N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy/P. Foerster - Chair DATED this U day of May, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALAS ilL AND GAS CONSERVATION COMMI. JN MAY 01 2012 ' PERMIT TO DRILL 1 20 AAC 25.005 A " 1a.Type of work: lb.Proposed Well Class: ®Development Oil - 0 Service-Winj ®Single Zone ' 1 c. Speer if'Rre'll-is`proposed for: ❑ Drill IN Redrill - 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska) Inc. Bond No. 6194193 ' PBU C-03C - 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12510' ' TVD 8882'ss ` Prudhoe Bay/Prudhoe Bay _ 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028305 • 1316' FNL,879' FEL, Sec. 19,T11 N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 651'FSL, 1770'FWL, Sec. 17,T11 N, R14E, UM August 15,2012 . Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 315 FSL,4485'FWL, Sec. 17,T11 N, R14E, UM 2560 24145' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 63.66' feet 15.Distance to Nearest Well Open Surface: x- 664500 - y-5959906 ' Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 150' 16.Deviated Wells: Kickoff Depth: 9610'' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3250' Surface: 2370 - 18. Casing Program: Specifications Top-Setting Depth-Bottom ! Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 4-1/8" 3-1/4"x 2-7/8"_6.6#/6.5# L-80 TC-II/STL 3010' 9500' ,8381'ss, 12510' 8882'ss 73 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 11635' 8990' 10297', 11360' 11544' 9003' None Casing Length Size Cement Volume MD ND Conductor/Structural 80' 20" 484 sx Cement 80' $0' Surface 2524' 18-5/8" 4700 sx Permafrost II 2524' 2524' Intermediate 4331' 13-3/8" 1210 sx Class'G'.950 sx PF II 4331' 4176' Production 8202' 9-5/8" 4670 sx Class'G'.619 sx Class'G" 8202' 7342' Liner 1356' 7" 275 sx Class'G' 8054'-9410' 7216'-8365' Liner 2380' 4-1/2" 290 sx Class'G' 9250'-11630' 8229'-8997' Perforation Depth MD(ft): 10185'- 11530' Perforation Depth ND(ft): 9002'-9004' 20.Attachments: 0 Property Plat ® BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Zach Sayers,564-5790 Printed Name John McMullen Title Engineering Team Leader Prepared By Name/Number Signature /IA/7 ro,Z Jliv„ f'f ,;//hone 564-4711 Date Joe Lastufka,564-4091 Commission Use Only Permit To Drill API Number: Permit A I gate: See cover letter for Number: Z I Z SS 50-029-20124-03-00 4J� ` other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbe methane,gas hydrates,or gas contained shales: Other: g- 35-0e3 pc g b f/G s t- Samples Req'd: El/Yes 0 No Mud Log Req'd: Oyes No H25 Measures: PAI Yes 0 No Directional Survey Req'd: Yes 0 No APPROVED BY THE COMMISSION Date,S-8-1 Z / ,e.„4. . --- ,COMMISSIONER Form 10-401 Revised 07/2009 This permit' valid for 24 months T1 dC f NorAT2.0 AAC 25.005(g)) Submit In Duplicate To: Alaska Oil & Gas Conservation Commission From: Zach Sayers iro)iro) CTD Engineer Date: April 27, 2012 Re: C-03C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well C-03. CTD Drill and Complete C-03C program: Rig Start Date: August 15th, 2012 Pre-Rig Work: (scheduled to begin May 15th, 2012) 1. F MIT- IA to 3,000 psi, MIT-OA to 2,000 psi 2. W Cycle LDS; PPPOT- T to 5,000 psi 3. S Pull BKR Rock Screen from XN nipple at 9,249' MD 4. S Dummy WS Drift to 9,800'MD (17° Inc) 5. E Mill XN nipple at 9,228' to 3.80" 6. F Load and Kill well with 1% KCI 7. E Set 4-1/2" KB Whipstock at -9,610' MD using CCL to locate mid joint. 8. F Test KB whipstock to 2,400 psi for 30 min MIT - r-<-kt-r-("IIt` '- 9. V PT MV, SV, WV 10. 0 Bleed wellhead, production, flow, and GL lines down to zero and blind flange 11. 0 Remove wellhouse, level pad Rig Work: (scheduled to begin August 15th, 2012) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" window at 9,610' and 10' of rathole. Swap the well to PowerVis. 3. Drill Lateral: 4.125" OH, 2,880' (12 deg/100 planned) with resistivity 4. Run 3-1/4" x 2-7/8" L-80 liner leaving TOL at 9,500' MD. 5. Pump primary cement leaving TOC at 9,500' MD (TOL), 15 bbls of 15.8 ppg liner crnt planned 6. Cleanout liner and run MCNL/GR/CCL log. 7. Test liner lap to 2,400 psi. I�.A'_✓ 8. Perforate liner per asset instructions (1,000') 9. Freeze protect well, set BPV, RDMO Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set 4-W liner top packer, and test to 2,400 psi (If liner lap test fails) 3. Generic GLV's 4. Test separator Mud Program: • Well kill: 8.4 ppg brine. • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (686 psi over-balance). - Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. • Hole size: 4.125" Liner Program: • 3-1/4", 6.6#, L-80, TC-Il Solid Liner 9,500' MD — 10,500' MD • 2-7/8", 6.5#, L-8' Solid Liner g,4 �` 10,500' MD — 12,510' MD • A minimum o'iliFirs of 15.8 ppg cement will be used for liner cementing. (TOC 9,500' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 92°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 24,145'. • Distance to nearest well within pool — 150' (C-03). Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCUMCNL logs will be run. - Perforating: • SWS 2", 6 spf, perf guns, 1-'/a" CSH work string, & 2-3/8" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • C-13 center to center distance: 167' status: plugback • C-13A center to center distance: 539' status: active producer Hazards • The maximum recorded H2S level on C Pad w 38 ppm on well C-33 on 4/16/2011. Reservoir Pressure • The reservoir pressure on C-03C is expected to be 3,250 psi at 8,800' TVDSS. (7.1 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,370 psi. _ • An EMW of 8.4 ppg for this well will provide 595 psi over-balance to the reservoir. Zach Sayers CC: Well File CTD Engineer Sondra Stewman/Terrie Hubble a a m Ia Cl) mto a Q. a Ct co o 0 L E a g - N CO/� o 0 IIi d p C _c N ��W= o ' moo E ��; Z aaUU a CO M gZ W N z Pi a 1.6 1.6 a .0 00 00 z t.� j N N >> + + Z > 4 0 C m CO co I- 0 r N- O O CO m M. (V cr) r M i n cO cO O N- N 4 :: N _CV N b CO O CO (O N- V cD CO a N- v Q a= a= v a CD m N CO CO I U CO CO o (.0 (.0 > a 2 v ©@) w N O lJ L a U a) O 3 a N U cn U — -o a) o U) a >9MM > a) uJu) 0, U vUm m ch O a).N 'c a) 3 •rn 3 cD co F W 2 D 7 E.' - c o y > J J 0 [ a) N d 7 0 $�),): N c •a 3 •�U cr) 2 .a c a cr) co a) 2 J J 07 � CC c c 0. O )-1.` ca) u i E � ► u a) c 3 .a P- c u a) O E d a) 7, 0 LL c') .. o w y a) U m c a= � v Oc co o OV m y aa N CO O � u) Y O LaN O O m o J N c° Ln O `J7, 2 N O o N n O O1,4 R ❑ f- NM CO O O 0) CO c0 O O O drj W LO CD O) V 47 d) 0 0) Lri kL Ca .n a d F- 7 0 E O O -...0U •. m W O. U) > r + .. 7 a) N- N m # co C rnIs m c E c) CV 40. o c 5 m o L L Z W fn t N No 0 Ce a d Z = o 0 + O. z Q a e >- < Q N m N CO CO CO N c 0 ❑ Oas H H CC in a E o uv co y ° r .6 a m m Z O LL N 7 OW U Ci.Q O O O ch O O O> r Z = QO Om Q O o O O a> O J ❑ d O UJ CV Q O � a Z Z ca a — C m O O 0 co c• > ci. r&Di a U 0 m a a m D m OcaE Cu, 9_ Q O a 2 W -LO UCO CO c 7 2 Q :i + + z., o - m co co co •c c Q Z a a U U a r r .. a ■ c 0 W �. d r c F_' c a) coN co ' c .. N CN C N c d V O CO MD c O C >,is o 0 0 0 0 o m c z c R Rid 21 _ .c a m u) 13 N a :_ aF. .c c rn _ ° �_ c) m [. EO O a0. a) a) aa)) O` m in as y « o o a) a) o a) co N 'O r CD Z Ua` co55 ❑ a. 20 2 co Naa 3 a 3 2 O < > > M , CO O CO LU O O O O O O V O V 0) N. Q il)i O a) r O 0 CO O O] 0 C- V O O) O r a0 Oi a O N (D �() M O (` N O Q) N N O) CO N N V V M N N m 0 + + O O U co (6 0 LU LU F `� 0) O O CO CO N (O CO M M CO a) N t0 00 n N- N O m V N VD Cn CO O CO O V CO C. a- LL) CO H N C` — CO O CO a O co V N M (O N M N a) 0) CO M 06 N- C- CO N N N N N V n CO M O CO CO CV CON O CO = U O) Q1 m d) O) Q) Q) O co c- N 0 M M d e- N N N N N N N N U ©© -o > • O co O O cc; c6 7 a O N N 0 0 + + Z O CO CO O O O O O O O O 0000 U (D (O 7 Q O O O O O O O O O O O O O T 0 O LL) LL) O) Ni N Ni Ni Ni Ni Ni Ni Ni N N CO 6 v ,- .- r r U v 7 0)O d — (D0 0 Eg Jo 5 CMO0 co 2 ❑J ❑ - a)- r-- N- a) CO V LU co co co O CO co U .•• C- V CO O f•-• CO A- N O) O LL) CO N V• CO C p N M O O O) c0 CO O M r (D O ` L LU CD W LU C. C) O V (n N O) O) CO CO CO N • C) N.F. N N N N N CO CO CO (O (O r W r N- r r C` C` r N- n n n N- r C` n o 2N = CO (O co co LU co(O co(D CO co(O ( CO co co CO co C , @ co (D CO CO (D CO CO CO CO CO CO CO CD CO CO a) o W 16 G) i.+ C 6) U C6 a C U N E4 C O C C U rn O C- co co co O (O N- CO CO O V CO O d (6 £ o co W N CO (O W W CO N Q) t` t` V CO o r0. 0) 0 N CO CD LL) M (D 6 V CO (O O (D V4 O 0) — d' (6 c1(n p7 co co co co N 4- r- O) CO WCO CO O CO N Q' L y a .N C O O 0 O O O O O) O) a) a) O) C) CO CO ✓ ❑ IX t r co 7 -o t N Ni- N N N N N a- N- p > ❑ O 7 m U = CO CO CO CO CO CO CO CO CO CO CO CO (O CO CO J F Z cn ❑ c + -@o o rn 0) m 0) 0) 0) 0) 0) C) C) m m CD m m C OU a Z LL) Cc) LL) (n (C) In LU LL) LU 6- 6 6 U'7 In (f'7 O a (6 - 03 u.) ❑ c+ ° CO CO CU O) O) CO I- O N V O) LO) C- LL) O) • .. N N pT❑ ❑ a) (D C` A- CO co r-- V a) V CO V V N CO C- Cd O) N6 LL) CO CO V N- O) V N ❑ Ur 2 2 a) O) O) O V (O CO O CO co V CV N I� N- I.-- C- 00 00 CO 00 00 m O) CO O N N aN N N Ni- N N N N N N CO M M co- M M n I- 0 U _ (n U (D (O V co co co N N CD ca N coV)(D O LO CL r co (c') (D CO V O CO a) LCD r N I'D CO d U ++ ai ai a) (O LU N- V CO (o (O O (o (V c(i r cu E co co co co (O V V N CO (fl LL7 CO O O (a y CO H 0 0 0 0 0 0 0 0 0 C) C) C) 0) OD CO CO Z U +❑ ❑ (/) NJ- _ N N N N N N N N A- A- H H H H CL o >- Z • 0 2 O) N N CO CO O LO CO O a) CO m C) N • D) CO CD N N C- O) a) Ca LU a) N- a) N O 00 a0 (0 O N- (O O N C- m cO 06 O r--- A-CO O I- LL) (D N U N I,- N- A- CO -a- 0 V V V co co (D CO r r CO CO CO 0) O) O) ❑ CO CO CO CO a0 CD CO 6 06 6 W W CO W W > h M Uof LL7 V ..c) (fl CO co V O N CO V N I,- 00 m CO O) C- N CO CO r- CO O) CO CO (O CO V LL) V co CO a) O (O V O) CO N m N r r LU CO N o O CO O (N O O O O O m N a 0 Q o N a)i on V Cl) CO o CO m J V N CJ U d n h. _0 CO co CO a) LL] a) V V n co O Q co co r C� c0 (O C- (a (V CO (D LO 6) O N O ^ ^ 00 a) r r CO LLi N O) O O N V O (6 co N co O ,— N N CO CO V CO CO r CO O) Cn U T ❑ O) V O J • m co O U o C — O Q O a .cn I- O a) ,- O O C -O U M CO C E aj m O O @ as En d Q Z a. a. U U a. O) O O N N O O O 0 0 CO O O O O O O O O O O N O CO > CO O O O O O O O o O O O CD O O V" II W 0 o o w > V o 0 0 0 0 0 0 0 0 LL) 0 0 0 0 r` 1lp1= o E `- N LL? 3 (LU) CO CO Q. (MD .pp N. N- 000 CO a) o 0 o N CO CO o We c `i o o E 03 a) N 0 - of a a) ai 0 ai c a a) ai ai a o 0 0 0 0 0 `I a I- Y w v CO N CAI �_Jd c� o C 0) LL C ICI H c o m m y 3 m o Z O a m 3 ❑ w a v Co O O 0) CO O N CO N- O CO O O C) O O N N- O O O CO r- Co Co' O O N CO O N CO O O O O N O N sr co O O O . n 06 06 N- r- r r o o O .— o o o o C) ro ao ro N N O O CO CO 0) 0) 0) O) C) CJ) C) 0) O) 0) 0) O) 0) C) a0 CO CO C .0.31, +CID CO u • . LL1� co CO ~ CO L0 6 O O CO CO N CO CD CO CO CO O) O O) N N. CO CC) r- 0) N O O (O N CO '7 CO 0) N- CO O O N M O O N- CO O M CO CO CO CO 00 LC) N Q O NY d CO O) CO CO 3- CD O O) O N6 CO CO CO CO CO N N- r CO CO N N- O LC) O) CO CC) O O 01 0) CO N- r` O r- LD N- N-- = C1 V O (O (O N- 00 C 0) O 3- 3- N CO CO V LO CO CD I� N- CO 0 O CO N N N N N N N N CO' CO- CO- M CO- M M M M co- CO- CO- M U g a > N O O O CO 03 7 Q. O N N O 0 + + Z O O O O O O O O O O O O O O O O O O O O O (D CO 7 Q O O O O O O O O O O O O O O O O O O O O O 0 N N N N NN N N N N N N N N N N N N N N N C9 co co E co Q)'X O O 5. CO CO F til d O 0) CO CO (D M V CO N- CO O 00 r CO NY r O) CO U ,j CO LO C M N O O N CO V N O) N- CO (O 0) O 3- N- O C 0 m d1 CO CO Q1 r O O CO O O O CO O ' V O V 22L N- N- N- N O O O O O O O O O O O O O N V V' N D) N- O O) O O r N CO CO O O O r O O C) O r 3- N N N- N- N.- CO O co- co O O O O O O co- O O co- O) C) O) d) o N ' co co co O co (p co co co co co co co co co co co co co co co CG C /a co co co co O O O C° CD CO O O CO (O O (O O O O CO CO 2O w Ca) U co 72 u 0 C O ._ y d V O M (P V N- CA N O n O O CO N- O N V l6 O N O LD m r CO O CO NY CO r N 03 CO CO C)M CO LO N- r O 2 C) C) 0 yr O O O O O 0) N LO O r— O N O O) 6) Q) 4 O O O N > O . O O CA O N V a CO CO CO CO a NY CO O 0) N- CO LD N re reO re L CO O CO m m d1 C C C) C) 0) 0) 0) C) O) 0) CO CO CO CO O ra Q ?❑ ❑ o c is V CO CD CD CO co c� (� co (� c� (� co co (� CO CD cD iD CO c� co J F Z UI ❑ p O 0) Q) 0) C) C) C) 0) 0) 0) C) 0) 0) 0) 0) 0) 0) O) Q) 03 C) Z LO L() Ln LO LC3 Ln Ln CO CO CO CO CO CO CO Ln In CO CO CO CC) CC) 0 0_ _ a) N- CO r CO O CO C) CO V 3- CO O LN-U V CO CO O) NY CO CO 3- CA r- t!7 0) .- N O N. CO O co O in N Q1 CO CO O O O) 0) O CO M O r N M O O O 0) N N (.10 O O O O O M O o O N 0) O 03 O ❑ CO V CO CO O r- CO CO 0) O 3- N N CO R LO LO CO CO O g , co- M (`J vi co- C) f7 co- M a V a a V Ca H 0 0 _ CO Lx-) Cn co V 0) N CO co co co N- M M CO O V O a_ 0) 01 CO O O N- co M N N N 03 0) O N V O "3- Ca [a O r N- CON N N V M N V 0) r- CO a Cn n N O Q) O co O N V CO O LC) V NY sr sr a a co O 0) co V V .— p) co O 0) 0) co C) C) 0) 0) O) C) C) C) 0) C) 0) CO O CO CO CO O U)r - - - - - - — — a zz -. N. C) CO O) CO 0) 03 CO CO O N O O O N N CO CO O N CO CC) O CO O CO CS) NY 0) 0) CO O) CO O CO LO N O N O O 6M N O M O O M M CA O O N- O CO M st M M M CO N N N N O O O O O O O U) C) 0) Ol 0) 0) 0) O) Cr) O 0) C7) 0) 0) O 0) 0) 0) 0) C) W O) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ U) O O O O O O O O O O O co- O O O O O O O co- O ❑ - H O 0) O O N N N 3- 3- 3- 3- CO CO O O CO O O CO O CO O OO O CO O CO O O O O . O V N O N V O N O V O V C) O N f� O W N 0) O N- (D n O 0) O 0) CO m CO O O O O 0) O CO Q _ _ J t- O O CO N CO LO M N V CD r'• CC) O O 6) O O CO Q I,- CO Q) O CO N. O NY M CO Q) O CO CO N LO rnmO N N N rnrnC) 0) rnrnO O O O C) Q) C) T O) 0) O) CC) CD CD C) C) C) U >, (C E m -2 c t 'p U co M 0 2D co Q z a a 6 ad 0 0 0 0 0 0 0 0 0 0 O O O 0 0 0 0 0 0 0 0 T O o 0 0 O O o o O o 0 0 0 0 0 0 0 O O o o N+' 111 M > O O O O O CJ 6 (7 (7 (J O O LCi O (J O Cn O LO 6 O lW O O O CO O O O LO O O O O N O O O N O r O O 9 ag= 7 N' CO O O N- CO 0) O) O N CO CO NY CO O O N- N- O 01 0 �WO c ., ` ❑ 0 0 0 0 0 0 0 0 c va ^ 1r v �� � � N 4iid al 4-; .. a rn c o m F o •o : . co LU O O O co O N O O r� r^ M O N- LU CO O a- CO O 33 n a0 cc o0 C) C) C) O) O O O N N c0 CO 00 CD 00 C) CO C) C) + + o m qRp CD 0 0 (0 mo '0.00'4M co N -- O co co (0 N O O M M CID CD V N O co co O) C) 00 (n 0) = = a N co ,— O M N (• N 1- a o o a cri (n a Ci h: h: C- cq (n N CD CO CO i 0 CO CD CD ,- C7 C0 CO CO r- (O CO > VI �" M M V V V 4- V a U -o > a) o a o MCO▪ ) - CIO CO m _p N N Z Z O O O O O O O O O co co = Q O O co O O O O O O I r a- 0 _ N N N N CV ,-- N CV CV CV N N = a- CO= v 00 .0 2 01_1o 0 — Coco ❑ ` y M a0 CD (D LU V CD CO o .a N O N• O 0) 0) 71- (0 V c o O ,— C) .— O O C) N 2 LCV 73 d1 Co (M7 V IN (D CD N CO 00 o d c C) C) C) C) C) C) C) C) C) a, 2 4=2„, = co co (D (D CO CD CO CO (O C `� co CD CD CD (O CD CD CO CD asW R o G) i+ 'O C• U i o C c C d U W N co co N d f6 r Cr) V o0 m tD V' co C w y d V d u) N M M .- O co u) o 0 41 W T f6 a) 00 r- co O) (O LO ce Q. t d d c n N N N N N. CO CD (D To w p ❑ C❑ o R r rn C) CO C) C) 6O). COO. 00). COO J C Z (� ❑ 0 (n u7 4) (n (n (n u7 (n LU Z 0 Q O M M N N (D CD (O (f7 r '(f r CO LO I,- r- 00 CC O N CO CO C) N O 00 0) (n r-- (D LO (0 u) U3 U) CO CO CO O N M M _CI E ' a a � Lr tr u) ui Lc m D W — I- 0 U a N- CO0M (OO, v (V (0O W O Ca v 0 C) N- 4 C) in N (h N CO C) O) C) N M M 7, N NN (O CO CD CO (D CD CJ a- a- a- a- 1- 1- 1- Z O C) O N (I') CO CD U3 C) CO N O (D O N V- O (0 C) C) (D N N O O C) C) C) 0) 00 00 00 Cr) CO 0) CO 00 c0 CO CO CO CO co- c 00 c6 O CC O O C) C) O CO CD CD (O M N N V M O CD co C) 4 (0 CO CO N N O CO 00 CO O CO .7--- r r r r r r Q CO Q Q00) CO o 0 CD CD rn CO CON Si N co.' N CO CO CO C) CO C) CO C) CO C) U T CO (0 IN U D� C :r • N � N ' Cc O U M M C O O 2 m OO (6 O Z a. d 0 0 d o 0 0 0 O O o O O Q T O O O O o O O O O in �Y d CV • W ` cc;N O O O 0 0 0 0 0 (� r O O O CD O O O MIMI O CO O N N CO y U3 (C) m O \WNJ y d y ❑ N ,_ N CV- C � N N N N � NMrM 2 � co ..� c c 04= F a a CI C oom o ) c o= m m o a 7 c.) au) 0 a cn (o n_ 6 66 > > > > n N N > > > > + + m a„, O aoL. o v Z ,_ ,_ po N o co �HNR co co 3 CV LO 0 CD N M LO - CD CD CD (0 c CO CO N- 0) N O O p co co co CO M M J CO W (n = d V V V < (D O N `° (O = z z z z o M M 0 O Co 0) LO CO M N O co 0) CO O C) N 0) `) 0 "0 N O (O LO O = dO a0 00 Co O N N CO U Y Z.- (-/5Z J O O O O U Q N- N- N N Mo M co E co E - (0- (0 a ) .• CO - 5 o 0 co 0 0 0 0 0 0 0 0 0 0 C) 0 0 0 0 0 0 0 0 0 0 0 ` •c ❑ 0 0 0 0 0 0 0 0 0 0 0 0 0 o O 5 0 0 0 0 0 0 0 0 0 CO CO f- W (0 N N m V 6, 4 4 6 m N (o O M V (0 O N O (0 a M co V V V M N N O N CO W N O N N- N N V N O M O N V Co N (D CO N 0) V 01 N- 7- N N- CO CO O O O 01 CO N N N N- N W 0) cn r- N r` O Co m m O) 6 CO Co h N Q) u7 LO LO (D N N m N N (0 L() C co co (0 (0 co O co CO CO CO CO CO CO CD (D O CO. CO CO CO CO CO CO CO CO a) O CO. CO O cD CO CO CO O CD (D cD CD CO O O O O O cD CD O CO O 0 o N co CO a) L w a) d a) 2 re C 0 [6 a) « O O 0 0 0 0 0 0 0 0 0 0 0 O 0 O O O O O O O C) C y p CO O O 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 9 C0) (NI N N N (0C.) (0 0) 6 Q) N N V 05 LO O V N Na ' C U ` V N Co Co V co o) o C) N- V V N- O N N N o N O N W N V 0 E ` CO 0) CO O O CO N O COCO CO N CO CO CO CO L() LO O O O LO LO LO u) _ _ _ _ _ V w d N U y C O ‘- CO O CONCONO (0 CO 0 CO 0 0 CO (0 O O CO c0 O O CO O (0 Co Co m - m t = C) C) W m 0) 0) 0) 0) 0) C) 0) 0) CO CO CO 0) a) 0) 0) 0) O) CO Q) CO C) 7-0 w L CU 0 O--- U) U) U) Lf) Lf) u) u) u) U) u) u) LD L[) 6 XC) U) u7 L() if) LC) LC) O XC) U) XC) 0• ❑ ❑ r Z J z L Z N ❑ 0 0 N V N- N O O (D N M CO N N N CO N (O W CO CO N CO (C) W O) CO N- N N O CO N M V' (D CD (D LO 0) a CO V CD LO (D W N 4 6 O O N N O O) C) M N 6 O (0 (0 (C) O 0) N W O) Co O cD CO N N CO LC) (D N- (0 CO CO CO CO N • N N V CO V M N CO N CO L- LO CO (C) O Cr) N N N- N N CO LC) CO M W -� M M M C0L) O 4 4 M co- co- 0rN M co- co (VN L- ~ + W co W co O a) o) U 0) (D N O LO N Co co co 0) u) O) 0) N N_ O N O N CO N Cr) N CO r--- 4 a N 0) N N V CO o 0 C') O O CD CO LO r-- (p N V O u) O O O N CI_ N O N O M M O M M CO O 4 M M M O O n O M Q) O O N O W O) M O 0:1n OO) ON O L0 co Co co co V LO 0) co N O OZ co O O co N 7 D co CO N CO CO N CO CO O N M N l] CO O NZN LO LO u) (p LO CO U) LO LO co Z r NN N N r r r co Q.. N- Z n C o m O N CO O a co N N N CD 0 CO CO CO (0 CO (D COCD COCO O O O O CO c) CO (D CO (D (D CO (D (p (0 (D CD CD> CD (D CD CD CD CO CD (D CO CO cD CO c0> CO CO 0 CO (D CO CO (o (D (D M M H M co M M M 6 M M co M C) O❑ C)IL 6 M M 6 M M M M C) C) _ ❑ O O O (0 Co (O CO (0 Co (o CD CO CO CO N-> CO (O (O CO (0 Co Co Co CO CO CO E co co ~..)t- l0 LO co N Co W ❑ co ❑ 2 ❑ 2 O O a= O 5 O= O 0„” O• O•coQ_ O o co co O 4 Q) 01 G`"' u) V u) 0 ❑ O O CO m Ca TO '5st co Y co 4 co O O N6 O N O O pp O N O u) Q J O o o O Q C ..... T T T Q 2... _0 .0 0 al O >. _O. a) a) a) • co ❑ C C c E m 10 N C) a) a) co C L C Q_ 0 V a) a) a) a) r -0U M M c Um E1 E) ow O O co N •C) co �a �a Q Z a 0 U U 0 rn O 0) o (n N O L- ill M 5 _ ( (1 N M O (0 N- CD 07 M n)) N ,- N M a LO CD N O Q7 c W a) to N r O1 0) c C C C C C C C C C C c 71,4 (n C c C C C c c c c c c 6Mom E w d En.c >.E m'o '5 5 0 5 0 0 0 0 0 5 m E E m'6 'o 'o 'o 0 0 'o 'o 'o 'o 0 W e >` 0 10 'E cL. (a C C (7) c540_ 0_ 0_ 0_ 0_ 0_ 0_ 0_ 0_ 0_ 0_ Ca C C (a C T d d d d o_ 0. d o_ d d '- mugD coC " p c r Z : L F a0 0 6O H co'3 W co o N 41I d G y _ d CO 07 of a- y M n a M n 0- a n d 0•)n a O~ m (-� EO .O« d a/ a) co ca O O O O (O') Z U d to ❑ H H U U U U v co N.. .---, 6-'6 a n 66 > > N N yq�9/. 00N) a CO (00 0 7 O LO LO N 6 co N O CO c0 co (- (N CO CO CO CO 0) M M 0) CO CO a (0 = O O N a = z z M M (.� CO O > CO co @ @ • LO v U D N CD 6 6 3 a Co Co _O N N Z U Z Cr) c0 (0 7 Q O O co co M E CD U CO CO E ; : : : io0• oiNa0oD 6c0 O CO CO O O co 00 d W 00 7 'D• C U E m 7 (n o f •C o W c W 6) CD = m U o a) 0) Q' U N CD CO >. m C) C) To re e ❑ ,, r m u7 17 o LO CO J• 1- E 2 (/) O C m o y C U Q O a) o C) - Q) N Co aM •. 6 co fl ro (.0 J W n M cf) 0 F- o 0 co 0 U a o_ co co W a 7 N C 0 LO 7 M W 0) Call(N n CO C ( o m a00- 0 (0 D a O -co- C 0 N CO 7 LO CO ❑ C O H Y W 7 in co (� co rn F- W E M LO 0) M 0) 7 CO CO CO a- CD N W 7 CO N CD CO 0) N a- O 7 CO W in a- N CO c0 7 O LO CO CO 0 CO CO CD 2 N 0) N In (O (- (N 6 O O) N M 7 (D O 0) 00 (.r, 6 0) CO O 7 CD CO N- (D CD 0 0 CO N (D cn a- U) f-- n co co co O N 117 CO O .-- N LI) CO CO a- CO CO 07) y W N N N N N CO CO CO CO 7 7 7 7 7 7 LO U) 0 CO 01 + C CC 'O W z O o 0 O CD 7 (0 N LII LO 117 7 N In N CO CO N. c0 CO N LO 0 7 CO O N 0 (� CO N a- 01 N ,- 7 0 O O Z ra O co U 0) U, O c- O O (- 7 N M N 7 7 N- 7 7 M O O J QO JN (O OO O O O) 2N) LU0) O W7 W m 7hIWM En 2 N N N N N a- • V N- a- a- a- a- a- a- ❑ N 4- a- Cel n.m D) Q c6 .Z O Y O O V Q I� 7 LO cO 7 (D 7 07 N- X17 Cr) 7 CO (0 7 N CO (1) O O CO (7) CO a- CO r CO (. LC) (n O (0 0) 0) 0) CO CO N- a- W `� CO .0 10 w CO N M O O T N- r N 0) cD CP 4 7 6 Q0 0 > ❑ t d V Mn Lo (rn N- CO rn o rn CO CO N- rn rn CO CO 0 co7 0)@O CO0 m 0 m 0 rn CO 0 0 m co 0 00 CO 0 00 U T CO -0 7 O :.. U m E t o0 o N o 0 o O o 0 0 0 0 0 0 0 0 0 0 0 C c 7 -�^, ' 1!7 d CO O O O O O O O O O O 0 0 0 0 0 0 L L• d U 7 U U 0 y .c 7 O O C7 C7 cc7 O C7 C7 C. C7 U) Cn (n (n C7 O -0 U CO CO c U U 0 ` Q) N 7 a O) N- M CO I- 0) Cn (n co co O N N C` N O O co 0 0 (a U U u) Q, LC7 CD CD CO O CO CO CO N CO CO h CA N cn Q Z a d 0 0 0 `2' C y O Cr) 0) CO 0 0 0 0 0 0 a- a- a- a- a- a- N N V/ N W 7 m (0 o V W NY a)� c «o (n Wow= ET'.-E 2'C .o 0 0 ,_410mie a y (a c C o C c 0_ C mew c .. F- co'5 F- mo c eN ,- 411 (4 no .. a a, Uo.a Oo.0- c Q o Z W W — c.) . , M y) C N m En o D w W W y OO !0 m CJ 7 C.) 0. u) 3 � 0 U 0 0 0 v IMeg= Pule11111111......11111®�, g a= ■■■■N ,■■■■ 03 ;w , aZ } ..111 M■■■ Mua ■■■ ; = o c ■■■■151EHNi■■■ F, I .48 [ ■■E■1�NN■1■■■ g 4 _ = � 8 0 ■■■■N NINI■Iu s � N - I Y ! .� ■■■■■\1■II ri N p MINIEFIUMME ; z . 2% i 1 MEM ■■ .= U / 3 1111.111.111111111.111.11111EEll ! H m ■■■ ■■ ' m __v 1....171WA ■ t rm ■■■■ ■■■■■ ^ ■■■■IME■■■ _ U v m g o - Y N ■■■■■■■■o U N ■E�INMMN■N Ni m qMq U m 1 g \ _.,- 3 ow 2! Q A E d $j b $ § g z_ ' P,_ n 0 g l.. ■ ! 'u■■■n Lc, �S v E °e$ � eS FI '' O ° _F (uvu OSI)(+)u116N/(-)ql;nos milt - _ iii _ 4 tol g _ _ _ ME ... oEi i - N N m a .-:<----€) '. �a�ewYN mn mm N m 2 ■■■■■■1uI. t 1111111111111111 a� 4mem �mg�� MMM■■IMM S 11899R99R8R 8 9R ■■■■■M M■■ 1;21wN $m$8gsg8gggg8sg8g.tiz ■■■110 ■■ $ =qoCi 9omm�N NNNNNNNN g � m" gM.T8'aM ''NN�w$u3Eg% me1m2.0M.eoFHEl ■■EN/.FA®■■ '1 F " PM■■V7■■E■■■ y L, a - mmmmmmmm �" II�--■■M■■■■■ g �6g2 �almm,q.,m� Y rN■■■M■■■■ e zN voRoRoo�on� m. mry � * � m8n _ ■■Ml■■■1IU■■■ m s m m m m m m 3 0 0^m ■■■■■■IE■■■ii ; •jo 89888888800$00088 _ _ _ o R ■$� '888$8.,...-m� c'Wg 2 i m _ m m 1 1 a S �� ^' m 30 i ,_. A-..,..,..?-;:w (u?/U 06)l daG IE0! A acuI N W ilmegi ®W m4x CY, r' '' ■■■C I \ o ; Z rr _ ■ 1•.51■ J J _ n v s Jr 1 (E0098 ■'■■■� A o �oos$_ � ''8� ■■■■ __ '::`,177-1i „ r, 3 0088 /0, aaa � o U II Pli 0098 t,m O o - .. n gio5sTA $ 4. J Um E O g! n o � M rn __ ikillik 1 ,' I. tr m ■■\ F, ■■E. g d a SSa 14 d a fT _ litg 0. a ,1, a 1 - N8 8600 1 \ ' 8 - E .. , 0 E I .,-. I 0 2 - : g ii r, r r n r n n- N m E n oi 5 h 2 . E. g o a E m M (ulna 06)(+41ow(-)91nos m I f vi T. U„ W w' - c~i= 1.eg=POW,MMo❑ �� a�04?0,q«rv�msm ^mm a >>s "Q= i188888§8888$88888 "Ss '>gss ^q ">1- sSS 'S 533m s E � 3 a ^ � A Z ; um a30. . �o ro'O53gao33a 3 << ..1 3; IELI sUMIr ! I _ 3 gsIIIi ! 3333AO RRRRAAApp „ # - - p gPmoin,!8m°'n88m,,m8 0 `LLci w 14111111114/t1141411+111141/441tt11t ligi 1 3 v'iu�s -9!-39 ss s >> s sm ss sass 8 w�#3Wa$N-n8828an� GGs sg yes s55gg 3 sq�spsa®>so� s �� D 3 m N N 3 H o o 3���ti S� O J 0 0 a!0!1 0 3 5 g 'q F -A1W HORRIWse am s��g��e� a a q�9s g O gae3s A a n$iVai$ ii g §.9g2 444444$/4+$444411444 I*++1444+ !11111+ !- RA$sssssm WY, €m .1„"Rgammmx'm'mm'm 4 1s Eiii i� e � MH§$Fra18$$88888,88 VS ;:m o 8 o 0 o 1110014P o H O N 1O� E 8,"'l L2 L2 IIIMININIzz s a N obc oz 2mUS o ---",_ 4701 ' f6 g S i v a N cn m� =oma U r .� Ncn C6801` rid gy At oA1Ire ir k%%4 :: .e 2 - I ow f. I 0 11111))) : 5_c;, v �4 ;v2 :i o`4WI 5 m V t7 EL= EZ," - N a a u3 3� \ c N 72 - TD 2. 0 Mill - - N 8 N-R U N BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB C Pad C-03 / Lat: 070°17'48.375"5 Long: 0148°40'04.275"W C-03C Plan 4 Travelling Cylinder Report 27 April, 2012 by 5000 • VPI BP e4"- HUGHES BAKER HUGHES Travelling Cylinder Report Is.) b INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Reference Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Site Error: 0.00ft North Reference: True Reference Well: C-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore C-03C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 4 Offset TVD Reference: Offset Datum Reference Plan 4 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,610.00 to 12,510.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,448.15ft Error Surface: Elliptical Conic Survey Tool Program Date 4/27/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 109.16 8,189.16 C-03(GyroData)(C-03) GYD-CT-CMS Gyrodata cont.casing m/s 8,202.00 9,610.00 C-03B IIFR(C-03B) MWD+IFR+MS MWD+IFR+Multi Station 9,610.00 12,510.00 Plan 4(C-03C) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 9,418.44 8,371.91 DRILLING LINER 1 7.000 8.500 12,510.00 8,946.11 2 7/8" 2.875 4.125 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/27/2012 10:19:26AM Page 2 of 38 COMPASS 2003.16 Build 73 BP BAKER • HUGHES Travelling Cylinder Report 0 bp 1 NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Reference Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Site Error: 0.00ft North Reference: True Reference Well: C-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore C-03C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 4 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB C Pad C-01 -C-01 -C-01 Out of range C-01 -C-01A-C-01A Out of range C-01 -C-01B-Plan 4 9,762.77 11,275.00 1,305.41 174.54 1,230.96 Pass-Major Risk C-02-C-02-C-02 Out of range C-02-C-02A-C-02A Out of range C-02-C-02A-Plan 3 Out of range C-03-C-03-C-03 10,113.43 10,025.00 75.89 63.70 18.20 Pass-Major Risk C-03-C-03A-C-03A 10,914.40 10,800.00 102.51 76.69 26.00 Pass-Major Risk C-03-C-03B-C-03B 9,624.99 9,625.00 0.37 0.46 -0.08 FAIL-Major Risk C-04-C-04-C-04 Out of range C-04-C-04A-C-04A Out of range C-04-C-04APB1 -C-04APB1 Out of range C-04-C-04APB2-C-04APB2 Out of range C-04-C-04APB3-C-04APB3 Out of range C-04-C-04B-C-04B Out of range C-04-C-04B-Plan#5 Out of range C-09-C-09-C-09 Out of range C-09-C-09A-C-09A Out of range C-09-C-09A-Plan#5 Out of range C-10-C-10-C-10 Out of range C-10-C-10A-C-10A Out of range C-10-C-10B-C-10B Out of range C-12-C-12-C-12 Out of range C-12-C-12A-C-12A Out of range C-12-C-12APB1 -C-12APB1 Out of range C-12-C-12B-C-12B Out of range C-12-C-12C-Plan 4 Out of range C-13-C-13-C-13 12,225.00 11,100.00 966.44 1,203.85 -207.72 FAIL-Major Risk C-13A-C-13A-C-13A 11,000.00 12,487.00 539.65 1,068.33 -524.11 FAIL-Major Risk C-14-C-14-C-14 12,375.00 11,625.00 1,077.86 1,246.01 -145.05 FAIL-Major Risk C-20-C-20A-C-20A 12,450.00 12,475.00 875.39 791.47 90.88 Pass-Major Risk C-20-C-20B-C-20B 12,450.00 12,475.00 875.39 791.46 90.88 Pass-Major Risk C-20-C-20C-C-20C 12,325.00 11,950.00 1,246.89 972.32 285.20 Pass-Major Risk C-23-C-23-C-23 Out of range C-23-C-23A-C-23A Out of range C-23-C-23B-C-23B Out of range C-23-C-23B-C-23B wp04 Out of range C-23-C-23C-C-23C Out of range C-23-C-23C-Plan#3 Out of range C-24-C-24-C-24 Out of range C-24-C-24A-C-24A Out of range C-24-C-24B-Plan 3 Out of range C-25-C-25-C-25 Out of range C-25-C-25A-C-25A Out of range C-25-C-25B-C-25B Out of range C-26_DIMS-C-26-C-26 Out of range C-26A-C-26A-C-26A Out of range C-30-C-30-C-30 Out of range C-30-C-30A-C-30A Out of range C-34-C-34-C-34 Out of range C-34-C-34A-C-34A Out of range C-34-C-34A-Plan#2 Out of range C-35-C-35-C-35 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/27/2012 10:19:26AM Page 3 of 38 COMPASS 2003.16 Build 73 Mil BP BAKER ,, ., • HUGHES Travelling Cylinder Report z o bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-03-Slot 03 Project: Prudhoe Bay TVD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Reference Site: PB C Pad MD Reference: 63.66(35.16+28.5)@ 63.66ft(63.66(35.16+28.5)) Site Error: 0.00ft North Reference: True Reference Well: C-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore C-03C Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 4 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB C Pad C-35-C-35A-C-35A Out of range C-35-C-35B-C-35B Out of range C-36-C-36-C-36 Out of range C-36-C-36APB1 -C-36APB1 Out of range C-36A-C-36A-C-36A Out of range C-37-C-37-C-37 9,793.63 9,650.00 312.74 205.76 113.49 Pass-Major Risk C-37-C-37A-C-37A 9,793.63 9,650.00 312.74 206.09 113.17 Pass-Major Risk C-37-C-37APB1 -C-37APB1 9,793.63 9,650.00 312.74 206.12 113.14 Pass-Major Risk C-37-C-37APB2-C-37APB2 9,793.63 9,650.00 312.74 206.12 113.14 Pass-Major Risk C-37-C-37B-C-37B 9,758.91 9,575.00 313.91 209.64 119.59 Pass-Major Risk C-38-C-38-C-38 Out of range C-39-C-39A-C-39A 10,475.00 12,102.00 852.41 259.10 611.98 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/27/2012 10:19:26AM Page 4 of 38 COMPASS 2003.16 Build 73 TREE= 4-1/16"CIW WELLHEAD= CNVO ' SARL DOTES: ORIGINAL WELLBORE(C-03)IS ACTUATOR=.. BAKER C NOT SHOWN ON DIAGRAM. KB,ELEV= 54.46' BF.ELEV= 35.16' KOP 3000' f�1 rf�Max Angle= 94 @ 11603' A ff4 fy2039' —9-5/8"EZ CEMENTER Datum MD= 9941' 20"CSG — 80' ff� f�f Datum TVD= 8800'SS ff, 114 p 2054' —9-5/8"SEAL ASSY 1-1/2"TBG 1814' 1,1 If�1 2059' 113-3/8"X 9-5/8"BOT PKR/LNR HGR I. TOP OF 9-5/8"LNR 2043' )I 0 2074' —9-5/8"FOC 9-5/8"CSG,40#,L-80 BTC,ID=8.835" — 2068' M I 2138' —13-3/8"FOC 11 2206' —4-1/2"HES X NIP,ID=3.813" I PI 2332' —113-3/8"FOC GAS LIFT MANDRELS 18-5/8"CSG,96.5#,K-55,ID=17.655" — 2524' 41 17 ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3308 3295 18 MMG DOME RK 16 11/28/05 3 6120 5599 36 MMGM SO RK 20 11/28/05 13-3/8"CSG,72#,L-80, ID=12.347" --I 4331' I--A 2 8014 7182 31 MMGM DMY RK 0 11/13/05 1 9114 8114 33 KGB2 DMY BK 0 11/13/05 Minimum ID = 3.725" @ 9249' 4303' H9-5/8"FOC 4-1/2" HES XN NIPPLE 8054' 19-5/8"X 7" BKR C2 ZXP LTP w/TIEBK SLV, ID=6.30" MILLOUT WINDOW(C-03B) 8202'-8215' 8071' H 9-5/8"X 7"BKR HMC LNR HNGR,ID=6.23" 9184' —14-1/2"HES X NIP,ID=3.813" WHIPSTOCK(11/04/05) 8142' 9205' —7"X 4-1/2"BKR PKR, ID=3.875" 9228' H4-1/2"HES X NIP, ID=3.813" I 9-5/8"LNR,47#,N-80,ID=8.681" —82024„7.';;*2 "Pik 9249' H4-1/2"HES XN NIP,ID=3.725" I EZSV PLUG(10/31/05) —I 8225' \: \ 9250' —7"x 5"BKR HRD ZXP LTP w/TIEBKSLV,ID=4.41" - 9261' H4-1/2"WLEG W 9270' H RS PO NIP,ID=4.25" 9272' —7"X 5"BKR HMC LNR 4-1/2"BKR ROCK SCREEN w/SOLID BULL NOSE(12/18/11 —I 9249' is, •, �� HNGR,ID=4.42" 9279' —5"X 4-1/2"XO, ��r ID=3.960" ``PBTD — 11544' PERFORATION SUMMARY REF LOG: 79299 ON??/??/?? 4-1/2"TBG, 12.6#,L-80 IBT-M/TCII, — 9261' N ANGLE AT TOP PERF: 86°@ 10185' .0152 bpf,ID=3.958" Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 7"LNR,26#,L-80 BTC-M,.0383 bpf, ID=6.276" —I 9410' 4- ` 3-3/8" 6 10185-10210 0 07/18/09 ///` 3-3/8" 6 10210-10235 0 05/06/09 4-1/2"BKR CIBP(05/06/09) 10297' / 3-3/8" 6 10255-10285 0 07/18/09 \`;;;�, 2-7/8" 4 10320-11230 C 11/14/05 3.50 BKR CIBP(04/13/08) 11360' ELM �\, 2-7/8" 4 11440- 11530 C 11/13/05 4-1/2"LNR 12.6#,L-80 IBT-M, .0152 bpf, ID=3.958" —I 11630' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/26/73 ORIGINAL COMPLETION 12/18/11 LEC/PJC PULL PLUG!ROCK SCREEN WELL: C-03B 10/05/87 RWO PERMIT No:'2051580 10/14/98 CTD SIDETRACK(C-03A) API No: 50-029-20124-01 11/15/05 N4ES SIDETRACK(C-03B) SEC 19,T11N,R14E, 1316'SNL&879'WEL 10/31/11 CDJ/JMD PX PLUG SET(10/28/11) 10/31/11 RM/JMD TREE C/O(10/30/11) BP Exploration (Alaska) Page 1 of 1 Schwartz, Guy L (DOA) From: Sayers, Zach J [Zach.Sayers@bp.com] Sent: Thursday, May 03, 2012 1:29 PM To: Schwartz, Guy L (DOA) Subject: Re: C-03C CTD (PTD 212-058) Only a packer whipstock, rather than a plug and a flow through whipstock. I will need to re-calculate the cement volumes on monday. Sent using BlackBerry From: Schwartz, Guy L(DOA) [mailto:guy.schwartz@alaska.gov] Sent: Thursday, May 03, 2012 01:22 PM To: Sayers, Zach J Subject: C-03C CTD (PTD 212-058) Zach, Are you setting a packer whipstock only?Your well sketch shows a CIBP also... Also the cement volume seems off, I get something like 24 bbls needed to get to the top of the liner. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 5/3/2012 TREE= 4-1/16"CW WELLHEAD= CMV C-03C SM. ,40TES: ORIGINAL NOT SHOWN ON DIAGRAM,W ELLBORE(C-03)15 ACTUATOR= BAKER C KB,.ELEV= 54.46' planned CTD sidetrack BF.ELEV= 35.16' L KOP= 3000' 1A1 1�1 Max Angle= 94 @ 11603' �/ r;: 1 Datum MD= 9941' 111 2039' —19-5/8"EZ CEMENTER Datum TVD= 8800'SS 20"CSG — 80' 1�j -14I 2054' —I9-5/8"SEAL ASSY 11 111 1-1/2"TBG H 1814' 111 1144 2059' _H13-3/8"X 9-5/8"BOT PKR/LNR HGR .41 11' TOP OF 9-5/8"LNR — 2043' ,4I 14 2074' -19-5/8"FOC .if.• eh 9-5/8"CSG,40#, L-80 BTC, ID=8.835" H 2068' M Q I 2138' H13-3/8"FOC 1! 2206' H4-1/2"HES X NIP, ID=3.813" I 2332' —116E1E1661kNDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 18-5/8"CSG,96.5#,K-55, ID=17.655" H 2524' Ill U . 4 3308 3295 18 MMG DONE RK 16 11/28/05 3 6120 5599 36 MMGM SO RK 20 11/28/05 2 8014 7182 31 MMGM DMY RK 0 11/13/05 13-3/8"CSG,72#,L-80,ID=12.347" H 4331' 1 9114 8114 33 KGB2 DMY BK 0 11/13/05 Minimum ID = 2.377" @ —10500' 3-1/4" x 2-7/8" XO 4303' Hs-5l8"FOC 8054' 9-5/8"X 7" BKR C2 ZXP LTP w/TIEBK SLV, ID=6.30" MILLOUT WINDOW(C-03B) 8202'-8215' 8071' H9-5/8"X 7"BKR HMC LNR HNGR, ID=6.23" 9184' H4-1/2"HES X NIP,ID=3.813" WHIPSTOCK(11/04/05) H 8142' 9205' —17"X 4-1/2"BKR PKR, O=3.875" 9-5/8"LNR 47#,N-80, ID=8.681" H I -8202 9228' —14-1/2"HES X NIP,ID=3.813" milled out Si.Si9249' H4-1/2"HES XN NIP, EZSV PLUG(10/31/05) --I 8225' - —-- S. 9250' -17"x 5"BKR HRD ZXP LTP 0 I. w/TIEBKSLV,ID=4.41" TSGR = 9,415' MD N; ` 9261' H4-1/2"WLEG 4-1/2"TBG, 12.6#,L-80 IBT-M/TCII, H 9261' _- 9270' -I RS PO NIP,ID=4.25" 0152 bpf, ID=3.958" ft. 9272' -7"X 5"BKR HMC LNR 7"LNR,26#,L-80 BTC-M, .0383 bpf, ID=6.276" — 9410' HNGR, ID=4.42" 20° 9279' -15"X 4-1/2"XO, ID=3.960" Top of 3-1/2"liner and cement @-9,500' ,./ 3-1/4"x 2-7/8"XO @-10,500' c 2-7/8"liner with TD at 12,510' 9 et,kr-- 4-1/2"whipstock @ 9,610 �� I , i' PBTD -1 11544' PERFORATION SUMMARY 4 { (.k ', i -.-�' ` REF LOG: 9927?ON??/??/?? ',4- ` ANGLE AT TOP PERF: 86°@ 10185' ///` Note:Refer to Production DB for historical perf data /� SIZE SPF INTERVAL Opn/Sqz DATE // ` 3-3/8" 6 10185-10210 0 07/18/09 4-1/2"BKR CBP(05/06/09) 10297' // 3-3/8" 6 10210- 10235 0 05/06/09 ;‘A;\ 3-3/8" 6 10255 10285 O 07/18/09 3.50 BKR CBP(04/13/08) — 11360' ELM '�\�. 2-7/8" 4 10320- 11230 C 11/14/05 2-7/8" 4 11440- 11530 C 11/13/05 4-1/2"LNR 12.6#,L-80 IBT-M, .0152 bpf, ID=3.958" H 11630' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 03/26/73 ORIGINAL COMPLETION 12/18/11 LEC/PJC PULL PLUG/ROCK SCREEN WELL: C-03C 10/05/87 RWO 04/23/12 WJH planned CTD sioetrae. WELL:' 051580 10/14/98 CTD SIDETRACK(C-03A) WELL: 50-029-20124-01 11/15/05 N2ES SIDETRACK(C-03B) SEC 19,T11 N, R14E, 1316'SNL&879'WEL 10/31/11 CDJ/JMD PX PLUG SET(10/28/11) 10/31/11 RM'JMD TREE GO(10/30/11) BP Exploration(Alaska) a> 11 a All .2 JHJa 9 Ir Ot2 II E o I1i O' — Y 0�� r 0\ . . 1 o 1fl = I1 PC ' " OfiaI • • i —MIII 11 I e 8° 1 g g illi ° fir 12,1 g au8 g U ¢ vt,gf`1[�n aEi S 1 4❑ A3 u — In z,s ICI i❑ fns :iui! IO Y I d LL _ I \ �� . �� r. Z n — I 'i ® " ® III, v III v CQ I cF (I Z 1 do O e :;, > INIg iri 11 81 O S 111 D •I N oma' 4 /� U I W LL V 11 U A G Y C/ ; IF • I 111 _ _ 11 Eli g 1 E E ; W 1 � $ II1 Ce i \ •: III 6 1 W +. I 11 2 44 I rc U I II I r I O I 1 1 < . -- ii._.-.0-- al . H __ I -7 . it 1 1 m 4LiaL I 1 IMI ,1 11 I sn II """'I mN I °j IIII?1 c Ii poi a ® 111 I.i A I �I u I in 11 c : c : ifiLH= 1 � I : I® X11 o it II ~ / . ill! III I r11=1111 1 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME C7— PTD# 'l ��� Development Service Exploratory Strati ra hic Test Non-Conventional// Well FIELD: rbc /L _ POOL: ✓2"-C<-,j�–e---, �l Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are - between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 0 To , : , " , r, n . ca 2. o TD a` . o Oa y' 0' co a �': E� 8, 3, _i M _ o m' �: N N 3 4 >, 4 o o E: m m: w' 2: U > O: L' C V & O: O o 0 0 • w co o) '� � fM N. =. a 7> to ff: N, V: : 7. ig N: co O' N. r , 0: m: ' ; E: E. N Z c. a) O: N p N M (V0, �'' : c'"), (0' !(n, d 0. - r co >- - a as, , , , ' • a . co - U' a4) p 0 coca I, �; to o 0 0:1Q O c' v CO _ o .3 _� in . a. m, N w O • , , , c,) c' O 3'0 an a) 0' a) 3 M m' to �' n 7' T 0 . co. 0' N a U 5' c 3 d ,Ot' O' N' N y: .o N Y 0 _ _ U o. a H' N' �. U c 0' � Q 3. a t0 y' : @ co' 4 m • . J. .0 ,- a) - 0) a) 6 0' y' 0'' p' L _' .O > 0- fV. = C 0 c: 0 0' Z' m 2 , a' Q, a). t �. , 0) 0) 'Co ' 'a 0'' co,T @' C 6 @� @� , N �. a) C •c' C0 C 4 O. ai o c, Lu m �: > U o U N' C' cco, di Q (, c: •a M. @ ' ., o E O a'' 0 0; 4 a , CO g' N' T �' N' n v' @ CD' 0'' ' co rn' CO €' u. c 3' �' o Z y' et• CO, o' v' c: @ ,T' E r o' a o -o O' N J •- 0' w C 't ', O' E' N' O, N' x : d' 4 "O v O C, �: 0• �0' .. O' 7' 7' 0' (0� Q' N X a)' @ W' a. U. Y' 0. , U, `p' Cl)' °'': °'. �' "', O' moi' �' �': I 0 LL'' �' a� U.1 Q , ' , , ' ; ' , , ' , ,I a zz, >, >, >, >, >, >, >, > >, >, >: >, Z, Z, Z Z Z Z Z >- > > > > Z > > > > > > ZZ > Z' ZZ T d a) I co v' T Q co 0 ' N CO : : I C. : @ m. , E 3 - E. a) . . . NC T L. : O ' 1 d E O: C' N T 0 o a) ' a)' 3. ' p V 'a o O m M. 0 C m Z 0. Ow m ami u, 0 a) o, o v, 4 Q CY C' `>°, 'C' O. a)' co' G ' co 0 l I' ' a' a) 1 t. >; C' 7' pf a• - V N vi t0 kJ D Q. -0 CD 4 .o' -O o: 0'' �: ' o' c' m v a) @' C' 0 d C , a) . C :Lt N C, V' y' O: 7: CO' �� �. C (d' d CO > �. N' 8- CD / y N. N: Q o' c m' 7' a) 'co �: T 4 0 .o ° o' co E' a)' o' •- M' �' O n' co m' CD Z' C 0) 2 y' @' T 3' 2'' co C a) L' C' O' 7' Q -o' 9 7' Q' tl) uo a)' N 0I Lu v' o c -o ' o' a) c v' @ a) : o E. a) CO p' o 0) a)' r a> C O Q M E E - 6 ' C: C E 0 @ N O C C •y: > F C O N o(S (I), CC C y w rn E N t 0. C C = cf) • ;II OO O •0 V' U N a) 7,5' v- c p 0 co 7: (� fl. d' 4 N U p' may,' a' O 3 OL' >- y a)'(/) < O O' a)' a)' c .S p. 7 w 'p, @: e•'' Y w,: 2. O: > @: O E •CO c o: �: Q: (`: - �) 1 T O. p) p: y, C CO J E. ci p o a) r a o: p c m. _ @: o Z o' E E 7' •c 3' a) a a) .cm 3 w' a)' E d Q O' a)' 7 4 c: C. a 0 (0' ' L. = 47 0, U 7 c: 4 N - a) 4 d O - E' m' c -o m: as. @' 0_ 0, :: a m m, -p. a)' @ c' w co 0 .c o 0, o, fl 3' p' c �' , 3' c E 0 0 �, '3_ '3 m `°' �' v, v, °� as' c `° y o °r v, m m ami o w o O Z p. •a V C l0' a) ,_ ,_ V U. 30' 7' d 0' W Q ' �' aS' O. 3. D U O O C' ' p' c w. 'v, '0. >' 0. 6' .pn v: •0 p �. E: o �. o: o: C' u �, Co -p: N' p: o: rn c v. & f�: �, y� w F U. N' 0: @' 4' N' N. (0' -0 5 OO. C: C Q c' Cl p .0-' .0-' Y' •O' a) O, a) EE. a) O E .L... �' p, I 4071 COQ O, C CO, • 0.'3 Q L' O. N O. d a) N, d 6. N d L' a) n (0' 0) (0. 'g. E: c' 0 .3 N' :=. O L' -o v,, c). a E @ o' o. co a) -, 4 0. co @: c E0 as al. co: co0 a°, c >, v _' c, w, �. •� •o p O (0 @ c 3 N C rn Y- N = e N N; 0 w LL 73 O • N. .0. � '0 'O 'O 0' _ C N a: a a: •O L: a) w Ty .0 .0 >O m «0 L. 3' N „ ~. y C 0 0 U5 0 a: C, o C E n X �: o. 7• a) @ u) u2, m 0 o _c @ . •E c_a = `o c@) �' �' p' a) a) .-- o a). (o o: � ; c. N 6. 0 as. `U 1- w >, w' c, 3 0 c�' c� 0000 0 cn v m: o: o. - @• m. m q E E. a) c 1 0 ,' 0. •0 o J > 0 E; m' C a) d. =y 5 D a) m' E. E c 'cit 1- 1- �, v ami ( ami > c 0. a, o Y`o , o, E ro ,w, m e 0 o. cu, a). c 7 4 4 a). d @' 0 7 2, 2 2 a), '0, m; v. �o .- O. O. N a) as a) N, o. ` � Cz, a, J, D, 5 5' 5, (n w 0. 0 a, 0 0 5,, a' a; 0 CO 0, 0, 0 U a, �, Q, a m, m, U 5-, N, 2, '�a, 0 co: w 0 ` p' 1� O - N M M CO CO 0) O - N M p() CO 1-. CO O O 1c,-; N M .c..1) O CO 1-. CO 0) I L-) E N M a (O co P a0 O) N N N N N N N N N N M M M M M (.1.,•i• M M 1' 0 -__- N N N • t -). p • p 1' 0 O C O C j0 N W N N C•1 - O lO w M 0) 0 CO 0 M p y(`� Ow. N U) 'a7 0c (!) u') 0 E�� T J.. N C N 0) o- ii I• Q 0 C n 0 a D U 0 LL •O d C d 0 0 d a Q a W w Q Q (n