Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout212-0607. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By: Date: APPROVED BY THE AOGCCCOMMISSIONER PBU C-09B Pull LTP Permanently Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-060 50-029-20366-02-00 ADL 0028305, 0028310 11653 Conductor Surface Intermediate Liner Liner 9035 80 2628 8977 823 3269 9227 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8561 33 - 113 32 - 2660 30 - 9007 8487 - 9310 8384 - 11653 2520 33 - 113 32 - 2660 30 - 8361 7873 - 8638 7777 - 9035 Unknown, 11612 2670 4760 7020 10530 9227, 9230, 9799, 10500 5380 6870 8160 10160 9138 - 11600 7" 26# x 4-1/2" 12.6# L-80 26 - 84618478 - 9037 Structural 7" Guiberson Polar Packer No SSSV Installed 8429, 7819 Date: Torin Roschinger Operations Manager Leif Knatterud leif.knatterud@hilcorp.com 907-564-4667 PRUDHOE BAY 11/26/2025 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:33 pm, Nov 12, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.11.12 12:18:42 - 09'00' Torin Roschinger (4662) 325-694 10-404 SFD 11/13/2025 DSR-11/13/25J.Lau 11/17/25 11/17/25 Pull LTP C-09B PTD: 212-060 Well Name:C-09B API Number: 50-029-20366-02 Current Status:Operable Producer Rig:SL,CT Estimated Start Date:11/26/2025 Estimated Duration:3 days Reg.Approval Req’std?10-403, 10-404 Date Reg. Approval Rec’vd:Check status Regulatory Contact:Abbie Barker First Call Engineer:Leif Knatterud (907) 564-4667 (O)(432) 227-4342 (M) Second Call Engineer:Finn Oestgaard (907) 564-5026 (O)(907) 350-8420 (M) Current Bottom Hole Pressure:3250 psi @ 8,800’ TVD 7.1 PPGE | (Estimated) Maximum Expected BHP:3400 psi @ 8,800’ TVD 7.5 PPGE | (Highest Ivishak BHP) Max. Anticipated Surface Pressure:2520psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2400psi (6/16/25) Min ID:2.313” @ 8,379’ at LTP Max Angle:94 Deg @ 10,321’ Brief Well Summary: C-09B is a coil sidetrack candidate that we need to pull the LTP for CTD Objective:Pull LTP Procedure: Slickline: 1. Pull LTP with Arrow Pac pulling tool Contingent Coil: 1. Pull LTP with Arrow Pac pulling tool Attachments: Current Wellbore Schematic Proposed Schematic Sundry Change Form Pull LTP C-09B PTD: 212-060 Current Wellbore Schematic Pull LTP C-09B PTD: 212-060 Proposed Wellbore Schematic Pull LTP C-09B PTD: 212-060 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________OOOGURUK NUQ ODSN-29 JBR 12/20/2022 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:7 4" and 2 7/8" test joints used for testing. Troubleshooting a leak on test #2 lead to pulling the test plug and redressing it before reinstalling it to continue testing. Also service HCR Kill and CMV #12. Upper IBOP and Lower IBOP failed during testing and were to be replaced. After finishing the test for the LPR, the rams were opened and the test plug and test joint came up out of the wellhead approximately six foot and contacted the top-drive. The well had been producing gas that pressured up underneath the test plug. After checking the pressure on the IA, the top-drive was raised and the tugger was installed onto the test joint to pull it out of the BOPs. Once the tugger started to pull the test joint the test joint and test plug were blown out of the BOPs and landed on the rig floor. The well was secured and an investigation into the incident was started. Testing was started again and I stopped testing again as gas was still present coming from the well. It was decided to install the tubing hanger back into the wellhead and not use the test plug to continue testing. Once the well was on a vacuum and the phase 3 status, that had ceased all work on the island, was lifted we went back to testing. Kill valve K3 was found to be leaking after some troubleshooting and was serviced for a pass. The annular failed and was cycled for a pass. All the precharge bottles were Test Results TEST DATA Rig Rep:J. Henson/S. BeardOperator:Eni US Operating Co. Inc.Operator Rep:T. Ashley/M. Ashley Rig Owner/Rig No.:Nabors 19AC PTD#:2121060 DATE:10/23/2022 Type Operation:WRKOV Annular: 250/3500Type Test:WKLY Valves: 250/3500 Rams: 250/3500 Test Pressures:Inspection No:bopGDC221018181714 Inspector Guy Cook Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 56 MASP: 2001 Sundry No: 322-448 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 FP Lower Kelly 1 FP Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 15 FPNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 11" 5000 FP #1 Rams 1 2 7/8"x5" VB P #2 Rams 1 Blind/Shear P #3 Rams 1 2 7/8"x5" VB P #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 3 3 1/8" 5000 P HCR Valves 2 3 1/8" 5000 FP Kill Line Valves 4 3 1/8"& 2" 50 FP Check Valve 0 NA BOP Misc 0 NA System Pressure P3000 Pressure After Closure P1650 200 PSI Attained P8 Full Pressure Attained P60 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P6@2058 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P29 #1 Rams P11 #2 Rams P8 #3 Rams P10 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P4 HCR Kill P4 FP FP FP FP FP FP BOPE Test Remarks Nabors 19AC Oooguruk ODSN-29 (PTD 2121060) AOGCC Inspection Report # bopGDC221018181714 4" and 2 7/8" test joints used for testing. Troubleshooting a leak on test #2 lead to pulling the test plug and redressing it before reinstalling it to continue testing. Also service HCR Kill and CMV #12. Upper IBOP and Lower IBOP failed during testing and were to be replaced. After finishing the test for the LPR, the rams were opened and the test plug and test joint came up out of the wellhead approximately six foot and contacted the top-drive. The well had been producing gas that pressured up underneath the test plug. After checking the pressure on the IA, the top-drive was raised and the tugger was installed onto the test joint to pull it out of the BOPs. Once the tugger started to pull the test joint the test joint and test plug were blown out of the BOPs and landed on the rig floor. The well was secured and an investigation into the incident was started. Testing was started again and I stopped testing again as gas was still present coming from the well. It was decided to install the tubing hanger back into the wellhead and not use the test plug to continue testing. Once the well was on a vacuum and the phase 3 status, that had ceased all work on the island, was lifted we went back to testing. Kill valve K3 was found to be leaking after some troubleshooting and was serviced for a pass. The annular failed and was cycled for a pass. All the precharge bottles were checked and pressured up if below 900 psi precharge. The only exception is precharge bottle #4 which has a bad bladder and is isolated. The remaining 15 bottles deliver adequate hydraulic fluid to be in compliance. Testing started on the 10/18/22 and was finished on 10/23/22 due to well control issues and weather preventing the hovercraft from traveling to the island. 18 hours of actual testing and 56 total hours of me being on site. There will be a separate report addressing the well control issue and the test plug and test joint being blown out of the BOPs. This report will be in Memo form. pulling the test plug and redressing it before re service HCR Kill and CMV #12. Upper IBOP pulling the test plug and redressing it before reinstalling it to continue testing. Also service HCR Kill and CMV #12. Upper IBOP and Lower IBOP failed during testing and test plug and test joint came up out of the wellhead approximately six foot and contacted the top-drive. The well had been producing gas that pressured up contacted the top-drive. The well underneath the test plug. Afte raised and the tugger was installed onto the test joint to pull it out of the BOPs. Once ll the test joint the test joint and test plug were blown out of the the tugger started to pull the test joint the test joint and BOPs and landed on the rig floor. The well was secured and an investigation into the ed again and I stopped testing again as gas was Testing was start still present coming from the well. It was decided to install the tubing hanger back into vacuum and the phase 3 status, that had ceased all work on the island, was lifted we went back to testing. Kill valve K3 was found to be leaking after some troubleshooting s found to be leaking after some troubleshooting and was serviced for a pass. The annular failed and was cycled for a pass. All the went back to testing. Kill valve K3 was found to be leaking after some troubleshooting precharge bottles were checked and pressured up if below 900 psi precharge. The only exception is precharge bottle #4 which has a bad bladder and is isolated. The fluid to be in compliance. Testing remaining 15 bottles deliver adequate hydraulic fluid to be in compliance. Testing started on the 10/18/22 and was finished on 10/23/22 due to well control issues and weather preventing the hovercraft . 18 hours of actual testing weather preventing the hovercraft from traveling to the island and 56 total hours of me being on site. Th weather preventing the hovercraft from traveling to the island. 18 hours of actual testing ere will be a separate report addressing the . 18 hours of actual testing and 56 total hours of me being on site. Th well control issue and the test plug and test and 56 total hours of me being on site. Th STATE OF ALASKA 411,LASKA OIL AND GAS CONSERVATION COMMIS • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations H Fracture Stimulate 0 Pull Tubing ❑ Operations st'iutdown ❑ Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:5t-f-C/e P M'-- 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-060 3. Address: P.O.Box 196612 Anchorage, Development H Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20366-02-00 7. Property Designation(Lease Number): ADL 0028310 8. Well Name and Number: PBU C-09B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11653 feet Plugs measured See Attachment feet true vertical 9035 feet Junk measured 11612/11615 feet AUG 17 2017 Effective Depth: measured 9227 feet Packer measured 8430 feet ,� true vertical 8561 feet Packer true vertical 7820 feet j�d.SCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 33-113 33-113 Surface 2630 13-3/8"72#L-80 32-2662 32-2662 4930 2670 Intermediate 8982 9-5/8"47#L-80 30-9011 30-8361 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"12.6#L-80 8430 7820 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED NOV 0 7 2017 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 542 45230 25 500 1079 Subsequent to operation: 429 46050 20 400 969 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory 0 Development I1 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Glasheen,Brian Pi / Contact Name: Glasheen,Brian P Authorized Title: roducti n• ee / Contact Email: Brian.Glasheen©bp.com Authorized Signature: ((( Date:g/1l77 Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/201 177-1- - RBAUGSubmit Original Only 4#WV7 DMS `, G 2 3 2017 • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED AUG 17 2017 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary AOGCC August 8, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug for Well PBU C-09B, PTD # 212-060. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Plugs Attachment PBU C-09B SW Name Date MD Description C-09B 07/03/2017 9227 3-1/2"WFD Widerange CIBP C-09B 05/14/2017 9230 3-1/2"WFD Widerange CIBP C-09B 04/14/2017 9799.3 3-1/2"WFD CIBP C-09B 12/30/2014 10500 2-7/8"WFD CIBP • • • a) Q. O O M O O co • N V ° r I0 V a+ 0 0 0 0 0 0 0 01 • C)) (0000 � NNd m Nt CO ,_ CO Is- CO cq QD CO M M Ul N OM000000000) N O CO 00 O) O) 1s- N- i I I I I I i I F- I"- I"- M OO CO M N O I, N — M 00 N M M M 1- 00 O O N 00 1- ti 00 O) 1- 4:1) N r- M to O M O) N QD CD CV Ill C.) MM mm1 1 1 1 1 1 , 1 1 jj W QCO 01 Q M N O 0000 CD 00 ,r 00 M _ '; co M M 00 co O N 0000 V = W O. O O O O O 00 ° 00 O cOO 00 O 00 J =y J �(ID 1aN #J 44. � � X . O O r U N M Cl) r- -- 01 O M N 4 )O M ONO O O O CO M • O d NWO A-00000 w Q coO o 75 ° 01-4 • w U o LLW W W c W Z Z Z w W w W w W m m O D H Z Z Z Z 0 D U CnZJJ JJI-- 1- • • • ar r �• NcV N_o0CD . C) 000 0vrn � C) C) Ns oi COCOMCOy O Cl O COCC) COC) CO CO 0• 00 CO 0 0 0 O 00) CCD 00) CCD 00) 00) 00) 0 0 H O. O I- N ct Co N N Co N N- CO 0) Cn CC) N Nt I- L O Cn 00 00 0 T- 0 0 O N Cn C'l ti N- co N CO CO 0 CO M CO CO CO CO CO M LU • LU 00000) 00) 0000 0 0 > • 0000) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0 W O � W Z W I- I- a y g g Y 0 0 'o co O O w Y Y o 0 0 Co Lo Io 0 0 0 0 0 0 0 - - - v v W w 41.0 a o N o 0 0 0 _ _• C00nCoC 0 E CO C00 < < Q LLl a a r Z 0 0 0 0 0 0 0• 0 0 0 0 0 - - 0 0 0 J LU LU O J O a, zzz ao a E O 0 0 0= = = z < < 01_ 0 M CC Z O Z III 111 0-▪ m 2220ccnncncnccnncan C a 'CC 0 CL 0 UI Co0 0 0 n Co 0 0 0 0 0 0 0 C = CO to O co in 0) N up O v- 0) Co CO 0 Q N o 0 0 0 0 A- Co Co CO CO 0) N LC) ▪ Lu 0 00000000000 CO cce %. em =u) 12 12 a 2 2 O cn cn cn ccnn can L. CD a. m O C-) c O U- V) Cl) U) U) U) U) Cl) Cl) Cl) Cl) Cl) Cl) Cl) U) mQmmmmmmmmmmmmmm c 0 0. o W - ILI D cn I- W a C O O O O O O o 0 0 0 0 0 0 0 0 Z U- 00 a < W W O N N N N N N N N N N N NNN N 0 W- N N U Cr) N N N N N N N N N N NNN N 0 a 0 V W W LL W O � � � ti � ti � tititi NNNN Q O O L] J J 0 Q ¢ CO CO U) can a ce a� E a) z m m m m m m m m m m m m m m m N0) 0) CD 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) O O o 0 0 0 0 0 0 0 0 0 0 0 m a a a 0 U.0 N w d 000000000000000 < < m co W W cn Cn 0_ cL • 0 o 7/5 w 0 - .C ._ . 0 co Q- v E .N m 0_1- X .3 2 = • M O _C N 0 (V a CI L .� ti E cu 2 00 •.N o .N N Lo O 0 N O_ II Q in M 13 N , O � CO _ � C u) N N y Z 2 @0 0 ,O " N N. :-0-` -0 N - N co"o- re N O1vo H N Qv - O CV 00 i 'N 0 c N0 .3oO i 0 0. t i CO _ CO. j uo -O U� 0 m OD � N u ci0 U Co • M2 U Z Q @)u N ~ `- o o N C Q N . 00 r W 2 0 }. In ed a_13 all o co O 'O fir' 0 W } � mt � � C x0m0 03 .- _c L (NI 03 H X00 < � � mea @�N Q'� 0 3 •22c° •v0 � © w Q = O2 O co aiQ •N 'u' u) 'v� .5 0_ 11 Cl) C.) 0- o Om � o � � a _ x o o_%-, �- Q- EooO a- o H tis I` ti N p In MCO O >- . 0- OCCoa0- W it o . U � � ' 0_ u�i (0 — oa E R{ < CQ pm - (nrx } Cr) O* fn .- N N 3 QN � '"' N E 0) C1 2 EV0_ U- D > i,- ZVCA = cn °• .- in Qo ° � ILEO 3 O a � 00U) � 2 co cr. Ur O ,- p EL) NI— C j vct = 20 � �>ZZ � } mo• o Nomm = � mv a. 03 Q 0 N ti /��, 0 J Q Lo F- N t1 V) 70 O 01 � Q_I� w 7 NCV 2vMOa. OO c) .11 0-- cu cu 43 N 0 a � m1 LL. 0 O 2' a. Q M a)CO _ >. Du) m D NZ E cn .... = C C1 o0U O O? � U � WW 0 ' j 0-� L0 ui a' o — n oHw H U� � 0, OaF- _ W cn C m L_ 3 ; vv''> E = 4.1 O @� mmZ 0mI- W = rn C .0K * CO " p = x m sl > (!) CO u' N a_ch Co 'n ' n u� o '-O N CL ._ O. re O ti waW J OW - ca. z 0 0.-6 ZI— ' O� —> aZ .0... — Z� y* -C9m ZZ > OOO m ° `n -0c; 1--- ,..%1 `n _ ZQ � JU II o NCQ O — A owlZCZm0 (6OZQN ° °2O � w > mct uS Evmo o $ No OQW 121 (0 °) >121 (0 °) >L0_ 00CU � vcnmO_ mOPrW0~ t-m � .Q'NoC o~E0Oo oN cc vO ISOQ _ --,2 � Nz - Zw0 pw CCpa0W (0 -ooz uo - - wo ._ co 9. N WcpW 0 HOa "7 . � NJ o Eo co _on no00 6 - •• i� 0dQWJQOa. pQa � o ooQ = MZ = 170 c= 0p Q2 : o iZ aow04- Ov' C . NN "M co 'O N tiW 0Wa Q 0W NC v 4 _ * �- oCU)z N � u) , m - OOWOOW ' m ;, O1- a) (NI n9chI- cni� Wu_ JJW a. ~ i _0L ~ yQ = U Z —o.Z QH H F- Jn F- 4 -0, � I- y � uU cn N I— o v' « MQ •Q-Q WMCWWWDMWCe : C _ CD 0 ;' * 1.0 > .N x a CCC .c0) 0mnna. a. JnJic H .Q Erli - a U _ W I- Q N. N. r--- 0 0 cn >- H 5 N N CO 0000 N. N. F.'s- 0 0 Q TREE= . 6-3/8'CtuV Ill _0 9 B S> NOTES: WELL ANGLE>-70°@ 9778'. WELLHEAD= OCT/FMC ACTUATOR= SH-3000 NfT1AL KBE 62.5' I BF.8_EV= 33.7' KOP= 2800' 20"X 30"Milt. 110' L1982' H7"SSSV OTIS LANDING NIP,D=5.962" - Max Angle= 94°@ 10321' CONDUCTOR Datum MD= 9950' 2601' -19-5/8"DV PKR Datum ND= 8800'SS 13-3/8"CSG,72#,L-80 BTRS,D=12.347" F- 2660' 1 8371' -7"ARROW PAC LW w/SEAL SINGER ASSY,D=2.313"(10/24/12) 8379' -12-7/8'X NYP,0=2.313" ____ ..____ 8384' --I 5.75"SCOOP GUIDE,D 5.75" Minimum ID =2.313" @ 8371' �= 8384' _BIT Gel 2 DEPLOYMENT SLV i� 7" ARROW PAC LNR TOP PKR ! w/GS PROFLE,0 3.70" -I 8396' -13-1/2"PUP JOINT,D=2.972" I 8405 -1 3-1/2'OTIS X MP.D=2.812" 7"TBG,26#,L-80 AB-U-4S,.0383 bpf,D=6.276" -8400' 8406' -j7"PBRASSY,D=? 8429' -19-5/8"X 7"GUIB PKR,D=3.833' 11 --I 8430' -1r X 4-1/2"XO,ID=3.958" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,ID=3.958" H 8461' CHBN CUT TBG(05/03/02) TOP OF 7"LNR H 8487' 8487' H9-5/8"X 7"LTP w/1.142 HGR,D=? 8750' H ESTMAT®TOP OF CEMENT9 5/8"CSG,47#,L-80 BTRS,D=8.681" 9007' ,' 1. 3-1/2"LNR,9.3#,L-80 SIL,.0087 bpf,ID=2.992" -I 9283' _ , 9227' -13-1/2'WFD EXTRA RANGE CUP(07/02/17) _1/w-IPSTOCK(08/21/12) H 9310' _ 9230' -,31/z"WFDWDEiANGECUP(05/13/17) K9283' -i 3-112"X 3-3/16"XO D=2.786' [i"LNR 2911,L-80 BTRS,.0371 bpf,D=6.184^ 9310' I. .% 3-114"LNR 6.6#,L-80 TCS .0079 bpf,0=2.850" -i 10488' ��' . 3.80"MLLOUT WINDOW(C-09B) 9310' -9324' ..44% 'C1 Ft tFORATIONSUMMARY 4 _ 9799' -{3-1/2"WFD CEP(04/13/17) REF LOG:SLB NUL 08113/12 , ANGLE AT TOP PERF:22°@ 9138' , Note:Refer to Production DB for historical perf data I SIZE SPF NTERVAL Opn/Sqz SHOT SQZ 2" 6 9138-9168 0 05/13/17 ,`---- 10488' H3-3/16"X 2-7/8'XO,D=2.377" 2' 6 9255-9270 C 04/13/17 10500' --I2-7/8"WFD CSP(12/29/14) 2" 6 9990-10020 C 03/18/15 - 2" 6 10035-10155 C 12/30/14 , 2" 6 10050-10080 C 03/17/15 I 2" 6 10095-10125 C 03/17/15 2" 6 10550-10580 C 05/19/14 2" 6 10580-10610 C 05/19/14 2" 6 10610-10640 C 05/18/14 2" 6 10890-10920 C 01/04/13 I ? -I FISH:CSP Nll.LED&PUSHED(12/28/14) 2" 6 10960-10990 C 01/04/13 2" 6 11280-11480 C 08/14/12 Da, 11612' H FISH:CSP MLLED&PUSHED(05/18/14) 2" 6 11500 11600 C 08/14/12 4N 11618' H PBTD [2-7/8"LNR,6.4#,L-80 SIL,.0058 bpf,0=2.441" - 11653' 1 UNI DATE REV BY CONSENTS DATE REV BY COMMBNfS FRUD-DE BAY T 10/12/79 N18E INT1AL COMPLETION 07/05/17 ZV/JMD SET DSSSV&EXTRA RANGE CEP WB-L: G-09B 05/14/02 N3S CTD SIDETRACK(C-08A) 07/10/17 ZV/JMD PLED DSSSV&RESET Tim FERNT No:"1120600 08/16/12C 1 CTD SIDETRACK(C-088) 07/12/17, A JLS/JMD TRIS C/O(07/05/17) AR No: 50-029-20366-02 03/18/15 MS/PJC ADF RFS(03/17-03/18/15) SEC 19,T11N,R14E,886'FNI.&1223'FE 04/18/17 t'LW/JMD SET CSP&ADFERFS(04/13/17) 05/15/17 NLWIJMD SET CSP&ADFEI FS(05/13/17) BP Exploration(Alaska) STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5(f CLOP [0.--- 2. LY2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-060 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20366-02-00 7. Property Designation(Lease Number): ADL 0028310 'TO v 8. Well Name and Number: PBU C-09B ADC, coZ83o5 swvoace •Tf I 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11653 feet Plugs measured See Attachment feet true vertical 9035 feet Junk measured 11612/11615 feet JUN 12 2017 Effective Depth: measured 9230 feet Packer measured 8430 feet true vertical 8563 feet Packer true vertical 7820 feetA GCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 33-113 33-113 Surface 2630 13-3/8"72#L-80 32-2662 32-2662 4930 2670 Intermediate 8982 9-5/8"47#L-80 30-9011 30-8361 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"12.6#L-80 8430 7820 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): JULTreatment descriptions including volumes used and final pressure: SCANNED U . 2 5 2017 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 424 32475 20 560 1914 Subsequent to operation: 506 31848 24 740 1850 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Glasheen,Brian P Contact Name: Glasheen,Brian P Authorized Title: Production Engin er Contact Email: Brian.Glasheen@bp.com Authorized Signature: li'i Date: td.. 007 Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/2017 Y7✓, �` .1/;e5-7/7 RB 0IAAS k/\-' J U NI 1 4 2017 Submit Original Only • • RECEIVED JUN 12 2017 AOGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary June 12, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug and Adding of Sag Perforations for Well C-09B, PTD # 212-060. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • m O o 0 O o 0 O M N O O R CO � o Nr p N N- U 0 Mom (D N- , CO o C)) CO 0 N Ca COCO N- CO C) NN- CO CO CO O CO NI- cn CO CO CO CO M N CO CO CO CO O O CO 01 N CO 00 00 o c f"- I� I- • I's CO O CO N co 00 N CO CO CO N. 00 CO O N CO N- I,- CO O N C Q) MN COOc � C3) N co 0,CO O N O �' co Lco C) N O CA CT CO CO CO V Ci CU 111111111 ca 2 Q ON CO OO 0 M N O CO (3) CO CO CO _ Cr) CO CO CO N 0 N CO V N- n a 00 0 0 O co co co i M ac 0 _ J J J 000 -I J CO = CC' N Jco .U) N xl� � " *kcsj �N = *kci U � O � N N - 00 CO CO f` \ N. ti N CO O M CO N 4 4 .c O N co O tf) an CD CO CO 0 0 CO -C.0 C 00 CO C) C c Nt JN 00 — �- c0 W C W •C7) W 0 0 u_ LtEtQ IX n Z Z Z cC W W W W W m tTl Q D H Z_ _Z Z_ 7.1 Z D j U Cn Z J J J J F'- • • N m• r Ln CO N CO ti N- 0) 0) Ln N CO r CO O 0 r.-. 1000r OOOOC)) '4 0) N- p. Ln 0 M O CO C j O O O CO O O Ln O CO a o (oN r) r) 0 r) M r) CM M M r) r) M p Ln O o 0 0 0 0 0 0 0 0 0 0 0 0 p O CA M a) M O d) O O 0 0 CA O) > F 0 N O N N O N. 0) O CO N ' . r 0 O CO CO O r r CO o 0 0 N- Ln Cr) aCo co Lli o co ti ai `O co ai tri ui rir� N N- O r N r) r) M M M r) M MMM M W O ' Ln o 0 0 0 0 0 0 0 0 0 0 0 0 > p CO C 0) 0) 0) 0) o a) o 0) rn a) 0) 0) 0) 0 > 2 r w � o O 0 uw) Z w OJ a 0 W d g▪ g Y U ° > mR 00W 00 Y Y g « O O N Lon COO 60) N LU COO O 0 No 60) COO 0 J J J Q Q U w • Q O 0 0 0 0 r r to CO O O o d O Q Q Q w a a `- N 00 0 0 0 0 0 0 O O O O r •- _U _ _U J W W -� U • p C'� CA �- . . . . . Z Z Z ° p p d Q Q Q = p p 0 0 0 LLU aq w Z o Z • CO LU LU 1.11 CL 2220ci ca www mm .11.,• O a U ° _ O Ln o o Ln Ln 0 0 0 0 0 0 0 C Cn M O Ln O a) N_ O O r O) COO O 0 M 0 r N 0 0 0 0 0 0 0 0 CO 00 ‘-N 0 '- r }1 W d7 a1 6) ca 0. 2 4) Y 00 Cl) - 20cncr) www0 a) 0 0 c 0 LL_ (A U) Ci) (I) Cn U) CT) Ci) Cl) Cl) (I) (I) Cl) Cl) t• < MCOMmmmmmmmmmmm a 0 a) d d m ti N- ti ti ti 0 0 r r r r r r r r . . . . . . . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w Z O N N N N N N N N N N N N N N N ZL U N N w COM M M M M C) M M M M MMM M Z W O J :5 ,-- = = = = = = = , . v . . . Z J 0 , ww lL W a Ln Ln Ln Ln Ln Ln In LC) Ln Ln u) «) Ln o Ln O m 0 D W 0 Q O W W Q Q a cn LL U cn LL Cn a d' N E Z• m m m M M m M M M M M m m m m 0) 0) 0) rn lr 0) a) 0) a) a) 0) 0) 0) 0) 0) O o 0 0 0 0 0 0 0 0 0 0 0 0 o LL. 0 U) O LL N C w ma a 0_ 0 J 0 0 W a UUUUUUUUUUUUUUU Q Q 03 03 CL tL Cn (n a CL I IF- a w 0 a 0 F- cn J 0 0 N •O N N N fY I- W II 0 N W 0 ID - = ot3 I ~ Qa. cn 0 } O U) wMO.. Cu a 0 0 E co p 2Q- FO O I- Tsi a (n T 0 CMp � Z 0 ca U) -tea ~ N -1 U J J 1- 7 72 o w a U w U v u Il '-I m oo - ' 0co > O O < - C? a "" Qai01- 'C CO ,1"-° w rn ° 2Q 0 i www O 0 Qcn = Q °O 02 � . O M u_-- a) E0U � rn = Omw JCS � paaJ .- Up0 .- Z "o ❑ > COUI-- F- « pZoF- = W LLb' 0 '4- * c) a Na CV ~ � NF" w W D II ui � w © QOJ sJ a = _ z = F- = icto2 Li cn W < F O N- N (170 J CO O HaZtrMZ Ur JO � 0 0 w D -1 p w 47 W F- 0 N. >- o w F- N : r- 5M m _ r F- c 0 Q TREE= • 6-3/8"OCT/FMC C 0 9 B r11114SArcTY oWELLHEAD= OCT/FMC � NOTES: WELL ANGLE>-70 9778'. ACTUATOR= BAKER C EL KB.B 62.5' BE E- BE EV= 33.7' .---) j KOP 2800' 20"X 30"NSUL - 110' 1982' H7"SSSV OTIS LANDING NAP,D=5.962" Max Angie= 94°@ 10321' CONDUCTOR Datum IC= 9950' Datum TVD= 8800 SS 2601' -I9-5/8"DV PKR 13-3/8"CSG,72#,L-80 BTRS,D=12.341H7" 2660' 8371' -7"ARROW PAC LTPw/SEAL STINGER ASSY,D=2.313"(10/24/12) 8379' H 2-7/8"X NAP,0=2.313" Minimum ID =2.313" @ 8371' R �_ 8 -{5.75"SCOOP GUIDE D 5.75- 8384' -BTT GEN 2 DEPLOYMENT SLV 7" ARROW PAC LNR TOP PKR �i� w/GS PROF«D 3.70" 'I 8396' -13-1/2"RIP JOINT,D=2.972" 8405 --13-1/2"OTIS X NP.D=2.812" 7"TBG,26#,L-80 AB-IJ-4S,.0383 bpf,ID=6.276" -8400' 8406' H 7"PBRASSY,D=? 6 J 11 8429' H 9-5/8"X 7"GUB PKR,D=3.833" I 8430' -17"X 4-1/2"XO,D=3.958" 4-1/2"TBG,12.6#,L-80,.0152 bpf,ID=3.958" -1 8461' C1-EM CUT TBG(05/03/02) TOP OF 7"LNR H 8487' I 8487' H 9-5/8"X 7"LIP w/LNR HGR,D=? 8750' -ESTIMATED TOP OF CEMENT [9_5/8"CSG,47#,L-80 BTRS,ID=8.681" -{ 9007- 16, 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992" 9283' , I WrIPSTOCK(08/21/12) -i 9310' _ IN — 0., 9230' _--I3-1/2"WFD WIDERANGE CDP(05/13/17) moo L7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" j 9310' •�. 9283' -I3-1/2"X 3-3/16"XO,D=2.786" 3-1/4"LNR 6.6#,L-80 TCA,.0079 bpf,D=2.850' 10488' ►,� p 3.80"MLLOUT WINDOW(C-09B) 9310' -9324' PERFORATION SUMv4 RY ,_ 9799' -13-1/2"WFD GBP(04/13/17) EF RLOG:SLB MCNL 08/13/12 ANGLE AT TOP PERF:22'@ 9138' ' Note:Refer to Roduction DB for historical perf data ' SCE SPF INTERVAL Opn/Sqz SHOT SQZ 2" 6 9138-9168 0 05/13/17 1� 10488' H 3-3/16"X 2-7/8"XO,D=2.377" 2" 6 9255-9270 C 04/13/17 2" 6 9990-10020 C 03/18/15 10500' H2-7/8"WFD GBP(12/29/14) 2" 6 10035-10155 C 12/30/14 I 2" 6 10050-10080 C 03/17/15 2" 6 10095-10125 C 03/17/15 I 2" 6 10550-10580 C 05/19/14 2" 6 10580-10610 C 05/19/14 , 2" 6 10610-10640 C 05/18/14 ' 2" 6 10890-10920 C 01/04/13 ? H FISH:GBP MILLED&PUSHED(12/28/14) 2" 6 10960-10990 C 01/04/13 2" 6 11280-11480 C 08/14/12 li11612' -I FISH:CUP MLLED&PUSHED(05/18/14) 2" 6 11500-11600 C 08/14/12 11618' -1 PBTD L-7/8"LNR,6.4#,L-80 SIL,.0058 bpf,0=2.441" H 11653' DATE REV BY (X)MMBJTS DATE REV BY COMMENTS PRUDHDE BAY UNIT 10/12/79 N18E INITIAL COMPLETION 01/06/15 BLS/JAM RSWCBRADP32FS(12/28-30/14) I WELL: C-09B 05/14/02 143S CTD SIDETRACK(C-08A) 01/15/15 PJC PERFORATION SYMBOL LOCATION PEWIT Nb:/`2120600 08/16/12 NORDIC 1 CTD SIDETRACK(C-08B) 03/18/15 MS/PJC ADPERFS(03/17-03/18/15) AR Nb: 50-029-20366-02 01/28/13 PJC LTP X M'CORRECTION 04/18/17 CLW/JMD SET CBP&ACPE;FS(04/13/17) SEC 19,T11 N,R14E,886'FNL&1223'FEL 07/02/13 TJWJMD LIP&X NP CORRECTION 05/15/17 NLW/JMJ SET CUP&ADPERFS(05/13/17) 05/22/14 LB/JMD MLL,SET CIBRADPERF(5/18-19/14) BP Exploration(Alaska) • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations II Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5t-1-- C/81) 1211 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-060 3. Address: P.O.Box 196612 Anchorage, Development m Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20366-02-00 7. Property Designation(Lease Number): ADL 0028310 8. Well Name and Number: PRUDHOE BAY UNIT C-09B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11653 feet Plugs measured 9799/10500 feet MAY 1 5 true vertical 9035 feet Junk measured 11612/11615 feet 2017 Effective Depth: measured 9799 feet Packer measured 8430 feet true vertical 8961 feet Packer true vertical 7820 feet (•,".( Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 33-113 33-113 Surface 2630 13-3/8"72#L-80 32-2662 32-2662 4930 2670 Intermediate 8982 9-5/8"47#L-80 30-9011 30-8361 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet / SEWED MA' 3 1 Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and 4-1/2"12.6#L-80 8430 7820 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 458 40451 134 1744 918 Subsequent to operation: 497 43435 146 1726 949 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development I1 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I21 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Glasheen,Brian P Contact Name: Glasheen,Brian P Authorized Title: Production gi;-er Contact Email: Brian.Glasheen@bp.com Authorized Signature: // / Date:5//J//7 Contact Phone: +1 907 564 5905 Form 10-404 Revised 04/2017 V l 51 1 O / t RB DMS L-/ l'4AY Y 1 ��I`� 4071 7 I''°'l I Submit Original Only • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED MAY 15 2017 RE: BP Exploration (Alaska), Inc. AOGCC Report of Sundry Well Operations Summary May 11, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for setting of plug to shut off uncompetitive perforations and add a new sand to make well more competitive and increase on time for C-09B, PTD # 212-060. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • cto o 0 (0 O o N- co M N v O a co r- o v l� p N N Lo N- U O o co 0 o 0 i M N O M 7 O CO Ca CO 00 N- CD (\I co co Co LU co co CO CO CO CO C CO CO CO CO O O CO 0) N 00 CO 00 O) 0) N- CI I II I-- I� N- CO CO 00 CO N O N- CO 00 N CO CO CO N CO CO O N CO N N- CO O N- CO G) a M CO L() CD LM (A N E O '- O r- co O co co M O N L() ( O N O O O O� CO CO CO ~ 2 I I I I 1 1 I I 1 Z co CO N CD CI ON) COOCO M CO CO CO CO �Y N a N >" CO CO 6) CO C .▪cm W O O T 00 co00 � O 00 co Q�2 - J J COO J 0000 M J NJ ▪N xr- � co co � *kN U fnO � � NNOMN _ co CO z CN CO 0!) c„;) N 4 t +' O N CO L0 Ln )O M CO D O OC J CO CO CO r CO W C W W .N U � Z c W W W W W m m pjF- zzzzDD UCnZJJJJF- � • a) N f0 CO in CO N CO N- ti O) 0) LU N CO — CO 0) N- 00 O 0) 0 0 0 0) V 0) N- p. M O CO j O 6) CO CO CO t!') LU CO CO d m N M M O M M M M M M M M M O CO 0 0 0 m 0 0 0 0 0 0 0 0 0 O O O 0) 0) 0) 0) 0) 0) 0) 0) 0) > F- Ci O F- NrCO N N (0 N- N M 6) Ln C) N V r- >_ LU oO V a0 O = 0 0 0 N- LO m fl O _� O CO N- O L O CO LU M N- 0 d o0 N M M M M M M M M M M M W O CO 0 0 0 0 0 0 0 0 0 0 0 0 0 > p O O O O O O O O O O O O O O O > 2 F- W 0 0 0 w z W W 0 w 0 m ~ Q J 0 U) -' Y U 0 MM 0 0 Y g W m 0 0 0 L L LU 0 0 0 0 0 0 0 U) J U U W W W 6. o 0 0 0 0 0) N - LU CO CSO ON) O cY CO < < < W a a C986300000000000 = = U) Z 0 J U U U J W J � � - m z z z o o o a � a Q Q Q 0 2 U U U W z O z Z 2 2 2 0 U~) f) fn U) C/) Q O Q L In O O 11') ll) 0 0 0 0 0 0 0 p, ioO M LU m O N LU O = O CO oO O Q m N O O 0 0 0 — Lo Lo CO COO N CO W 0 m m 0 0 0 0 0 0 0 0 0 0 — = O = J = H O a J a 7L 0 2 0 U) U) U) V) U) CL ate „ a 0 0 iii• aaaaa000Q00000 t Q m m m m m m m m m m m m m Q 0 a) a a> H m r ti N- N- ti N- r N- N- r N- N 0 0 = = = = = = = = = rrrrr 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W O N N N N N N N N N N N N N N Z LL < JJ W ` 0W D W w N N u_ M M CM M M M M M M M cM CM M M J y Z a U JJ W W a W 4444444444444 < 0111-- -J -JD -IDWW O m 0 D W -1 -1D -.:T O W W CL (1) IL Li J) w CO a Ct N E l6 Z m m m m m m m m m m m m m m • 0 0 M 0 M 0 M M M M M 0 M M O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w a U) 0 a N w COMMa U -' O O w a 6 6 6 6 6 6 6 6 6 6 6 6 6 6 < < m m LL LL. U) U) a s • • w Eo 0 o 0 co O w CO0 - J 2 2 co- 0 0 Y z 0 co 0 I Q 0 0 a) 2 H c a I- L CO u) g � O Q 0 Z M W p W 0 J c� E H < 0 CD ao M w J 0 0 co U) Q co- > W H U U) M co W H Y W > D H O M J a_a. H w in LO Hai' CO O co tri 0_ o a Y 0 UJ O w a w O 0 J J < < I CO OC Q G G OC in W C O H * g y p * 0 0 * Q a w w O m � 2 : 0 :c oc O4 c� c0 cp cQ w Cl) oQ 17- 9, Q � a CC (/) Q O > Q o o o w O U L M � � o � > � 00 Q � � � a) r: ca 111 as 06 CO Z_ O U E W N- ELL N U Q U U O NQS' O N > O W -o > -50 -8 "OD * I- ° O 2W N2JN OO �jM 5I� M coN 2° W Ou- 0 00 0 *0 W' D EU) OZCLwfXzO_ Z 1. N a) � 2 � a) "3 ami = W 0 - H Z * > a Z 0 Z 0 Z N - W a. Q E M p *K = LL p *K 0 O 0 O O w p \ O O O N H 0 E p L .T(' � � � 4* o Oa o_ � � ao �n O co O m NooWwu) Z wu) 0 W N4tW * °� W W 0o z O W H D Oi- � o ;�- (D0 * d * * F- * * W LU L O Q Z U) z ON Z E O Z J J * * J H z d LU a = al- WZ � o0HNH 1:; d0I > Y = 7u) : cnY « m 2:D p 0 cep * , , 0c\IIcpNONQ 0 * HOE. dH � > W CO � QCD � Qv- O Q a T � -J 0 - cs4 0 a 0 Q ¢CD � wz � � CO => a Y .?Co_ > aa � 2Q �' � � ° co- > P. cn ¢ 0 � 0 «30 tirn � N DO ? a C c 0 O W 0 u > w O "' w o w O OC O 0 23 o �o H QOCCCOCL. g5 = 0U_ v OC Q � OC2QHwQ < � o � ,_ o __ Jo 0 0 < < Oo 00CO CD 0 0 Zf0HoLLI DZ2I o0QNO0QO0 x F CC � OOa � � >- DI O = � = � � z � � Zcczzccz � o U- Q cnlLtL ZNH Z � a ( � av) - ZOw = OWOpwOQN WI 0 __I - _ mzowzo - � om � zOmzzzzzw� ZZWW _ � 4' w 0 0 w OW 0 w 0 W w 0 W 0 0 0 0 0 E 0 0 ec0 0 E L W - W OH -30 � T3U � -3 ,u -35cC >- -3UcCcCc..) C cC0UtYF' 25 w lc Hu) : * -3 0 : * - : : -3 : : -3 Q : « Q Q : « -3 : : -, c 0 co x « u_ w H Q N- N- N- N- N- N- N- N- 0 r r' r ›-- N N O O O O O 0)5 co O N N N N N N N CO O I = `- = N N N N N 0 Q 0 I- - co I- J LL1 O Q 0 O 0 a rn 0 0 J J (n a. J r 0 W I- N 0 Z Li N- N W W o) cd > a 2 0 0 f- 0 (Ni a I 0 w N• z (n o N >, D o m D. Cid D E _ Q E a� a) UU (~n z0 Www Q; Q t J aH u) I- 0 zw 0 a0 off -a (n 0 7) n Z a in o U < zz w } J CON: Zp CO Qw ° U ' � N z � O CO u] di a0) 00 t W « (2D2 w > UJ O OJ - QO C) 2 cKrx Q a. = > � J zrn CD re 5 � o62U OJ � Qa. >' rc < C X > mw -6 • a. Z N 8 2 ( _lac, : • C O - 2 = w (/) N ZN (O Z Oos, W f' II N H O) N o 0 (N J a. oW rn X W H II J1-- > oO - - • J = - 0 UJ< LLId (-) Er) (O m - = W w = W N O W z , a 4, zrY2ODa. rno5LL. : 0 N- C; N N- o.) m 4 •TWELU-1 AC= 6-3/8"OCT/FMC C_0 9 B SA tY NOTES: WELL ANGLE>-70°@ 9778'. AttUATOR= BAKER C EL KB.El 62.5' BF 8 BE .EV= 337' KOP= 2800' 20"X 30"NSUL — 110' 1982' —7'SSSV OTIS LANDING NP,D=5.962" Max Angle= 94°@ 10321' CONDUCTOR Datum MD= 9950' IL—Datum TVD= 8800'SS 2601' H9-518"DV PKR 1 13-3/8"CSG,72#,L-80 BTRS,D=12.347" 1— 2660' 1 8371' —7"ARROW PAC LTP w/SEAL STINGER ASSY,D=2.313"(10/24/12) 8379' H2-7/8"X NP,D=2.313" _ 8384' —15.75"SCOOP GUIDE,ID 5.75" Minimum ID =2.313" @ 8371' S 7" ARROW PAC LNR TOP PKR � � �/ 8384' —BTT J GEN 2FEL ,U 370" SLV w GS PROFLD .70 8396' -13-1/2"PUP JOINT,D=2.972" I ' 8405' H3-1/2"OTIS X NP.D=2.812" 7"TBG,26#,L-80 AB-IJ-4S,.0383 bpf,ID=6.276" H -"8400' \ 8406' 1-17"PSR ASSY,D=? ` 8 g 8429' —9-5/8"X 7"GUB PKR,D=3.833" 8430' --1 7"X 4-1/2"XO,D=3.958" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,ID=3.958" --1 8461' * .':..1. ,T. CHEM CUT TBG(05/03/02) TOP OF 7"LNR —{ 8487' 8487' H9-5/8"X 7"LW w/LNR HGR,D=? 4 El 9-5/8"CSG,47#,L-80 MRS,D=8.681" — 9007' .-.• 8750' -I ESTMA t ED TOP OF CEMENT 13-1/2"LNR 9.3#,L-80 STL,.0087 bpf,ID-2.992" —1 9283' r '" WI-4PSTOCK(08/21112) H 9310' Nr. ,y' 1 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" 1—I 9310' °,.i.,',0 4:7 9283' —H3-1/2"X 3-3/16"XO,D=2.786"v v 13-1/4"LNR,6.6#,L-80 TDI,.0079 bpf,D=2.850"_1--1 10488' ' ?� 4+; � 3.80"MILLOUT WINDOW(C-09B) 9310' -9324' PEFIFORATIONSIJMMARY _ 9799' I-I3-112"INFO CBP(04/13/17) I REF LOG:SLB MCN-08/13/12 . ' ANGLE AT TOP PERF:22°@ 9255' , Note-Refer to Production DB for historical pert data , SIZE SPF PfTERVAL Opn/Sqz SHOT SQZ 2" 6 9255-9270 0 04/13/17 '_____---- 10488' --I3-3116"X 2-718"XO,D=2.377" 2" 6 9990-10020 C 03/18/15 2" 6 10035-10155 C 12/30/14 — 10500' H2-718"WFD CEP(12/29114) 2" 6 10050-10080 C 03/17/15 , 2" 6 10095-10125 C 03/17/15 2" 6 10550-10580 C 05/19/14 III 2" 6 10580- 10610 C 05/19/14 2" 6 10610- 10640 C 05/18/14 , 2" 6 10890- 10920 C 01/04/13 , 2" 6 10960- 10990 C 01/04/13 0 ? --I FISH:CEP MLLED&PUSHED(12/28/14) 2" 6 11280-11480 C 08/14/12 2" 6 11500- 11600 C 08/14/12 ha, 11612' —{FISH:CUP MLLE)&PUSHED(05/18/14) 11618' —I PBTD 2-7/8"LNR 6.4#,L-80 STL,.0058 bpf,ID=2.441" 11653' DATE REV BY COIVIMENTS DATE REV BY COMMENTS PRLDF DE BAY UNIT 10/12/79 N18E INITIAL COMPLETION 01/06/15 BLS/JMD FISH/CBPIADPERFS(12/28-30/14) WELL. C-098 05/14102 N3S CTD SIDETRACK(C-08A) 01/15/15 PJC PERFORATION SY MBOL LOCATION PERMIT No: 2120600 08/16/12 NORIJC 1 CTD SIDETRACK(C-08B) 03/18/15 MS/PJC ADPERFS(03/17-03/18/15) AR No: 50-029-20366-02 01/28/13 PJC 'LTP X NP CORRECTION 04/18/17 NLW/JMD SET CUP&ADPERFS(04/13/17) SEC 19,T11 N,R14E,886'FN..&1223'FEL 07/02/13 TJ WJMD LTP&X NP CORRECTION 05/22/14 LB/JMD MCL,SET CIBP/ADPERF(5/18-19/14) BP Exploration(Alaska) STATE OF ALASKA RECEIVED .,KA OIL AND GAS CONSERVATION COME` JION APR A 9 2015 • REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon U Repair Well U Plug Perforations U Perforate H Other[] AOGCC Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4.Well Class Before Work. 5.Permit to Drill Number Name BP Exploration(Alaska),Inc DevelopmentD Exploratory ❑ 212-060-0 3 Address P O Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20366-02-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028310 PBU C-09B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary: Total Depth measured 11653 feet Plugs measured 10500 feet true vertical 9034 76 feet Junk measured See Attachment feet Effective Depth measured 10500 feet Packer measured 8429 3 feet true vertical 9035 5 feet true vertical 7819 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 30 07-110 07 30.07-110 07 1490 470 Surface 2631 35 13-3/8"72#L-80 29 57-2660 92 29 57-2660 84 4930 2670 Intermediate 8982 69 9-5/8"47#L-80 28 8-9011 49 28 8-8360 69 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth See Attachment feet SCANNED . ' i True Vertical depth See Attachment feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) 7"Guiberson Polar Packer 8429 3 7819 Packer None None None SSSV 12.Stimulation or cement squeeze summary Intervals treated(measured): Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 419 40909 124 0 974 Subsequent to operation: 466 31519 180 0 917 14 Attachments. 15.Well Class after work' Copies of Logs and Surveys Run Exploratory❑ Development Q Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work Oil H Gas H WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUC0 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt. N/A Contact Nita Summerhays ,(ail Nita.Summerhays ci bp.com Printed Name Nita ummerhays / Title Petrotechnical Data Engineer Signatu - 1 y� ,/ � Phone 564-4035 Date 4/9/2015 RBDMS)W APR 1 0 2015 Form 10-404 Revised 10/2012 Submit Onginal Only Daily Report of Well Operations ADL0028310 ACTIVITYDATE I SUMMARY Tn/O=7501200/VAC. Temp= SI. T FL(coil request). No AL. T FL @ 2500' (93 bbls). 2/26/2015 SV, WV, SSV= C. MV= O. IA, OA= OTG. 15:40 CTU#8 1.50" Coil CV= 24.4 bbls Objective:Adperf MIRU, change packoffs/inspect chains, install BOPs and function tested. 3/16/2015 ***Continued on WSR 3/17/15*** CTU#8 1.50" Coil CV= 24.3 bbls Objective: Adperf ***Continued from WSR 3/16/15*** MU PDS Logging Tools 2.2" carrier w/2.25" JSN - RIH -Tag plug- Log from 10,508'- 9700', paint white w/blue stripes flag at 9950.1' - POOH. BD PDS logging tools. MU & RIH w/SWS 2"x 30' perf gun#1 and perforate off CIBP 10,095' - 10,125'w/6 spf, POOH. All Shots Fired, ball recovered. RIH with Gun run#2, 2"x30', Perforate 10050'- 10080', 6 spf. POOH, all shots fired and ball recovered. 3/17/2015 ***Continued on WSR 3/18/15*** CTU#8 1.50" Coil CV= 24.3 bbls Objective: Adperf ***Continued from WSR 3/17/15*** RIH with Gun run#3, 2"x30', Perforate 9990'-10020', 6spf. POOH. LD guns-All Shots Fired, ball recovered. POP well. RDMOL 3/18/2015 ***Job complete*** FLUIDS PUMPED BBLS 10560/40 METH 105 TOTAL a> la m• aO N CO r O) C) LO N C10 (10 O) r.-- 000 ' - ,- 0100001 •71- O ti p_ M O Cfl M CA O CO UO CO LO LO co CO a a, N M M O M M M M M M M M M p 0 0 0 m 0 0 0 0 0 0 0 00 O p C) C) C) C) O) 0) O) C) CA 0) C) C) H a p ❑ W Z W W 0 W ❑ Q H U a a g Y ° o O O O W Y Y H 2 I- LO N N CO N- 00 CA LO CO N V N- co c J 0 U W L 00 t C0 O — O o o f- LOM JQ -17HW w v- N OM M M COM M CO CO M CO M _ Z U_ ZU_ J W W J O O O O O C3 O Q O O O O 00 Z ° Jp pJ J ❑ J o O O 0) O) O 0) O C) O mm « < = 000- 1-10- < a F- o U U W ieW Z o Z 2 2 2 O ccnn ccii� ccn co «cn a, U) m co L O G O LO LO LO O O O O O O O C-111 LO a0 CA N LO 2 g N CA a0 O 4 a O O O O LC7 CO CO (A 0) CO C O O O O O o 0 0 0 0 0 a co N _ acn = U O u) V c 2 2 2 0 c~n ai can cJn can Q c N0 H = p s 0 LO O O LC) In O O O O O O O J Q r, CO CO CO CD N LO 10 CA CO C00 O o D 0 0 0 0 0 0 v- LO LO CO 00 C)) N CO a a O 0 0 0 0 0 0 0000 r- r 0 1- C) o 2 L 0) a 0 U c • LL LL LL LL LL LL U) U) U) U) U) CO U) d 0_ • QQQQQQC] mCDmm mm a 0 t a, a ❑ W J J H D W H ❑ m LO LO lO LO LO LO V V V V V V 0 0 O O O O O O O O ❑ D u- c 0 0 0 0 0 0 N N N N N N N Z d d Qz W W OO I� O) a) a) O) a) C) 6) O CY W N N LL N N N N N N N a a. 000 WJ W W CC = = = = = = W W 0. 01C001010101cv CV CV CV N < DD a J O < < m (1 --,E U v C a a> E m Z COm m COCO m COm m COC0 MM o) CCC) rnrn0CC C) C) Mm u, 00000000000 0o LL a cn O LL N Cr U UUUUUUUUUUU UU CO Cl_ m m LUi L. CO cn a cc a) ac,• o 0 0 „papa N r- ti O CO V LO N LO.r 0 0 ` o O CO N- o ov o CO • v 00 O ' co O N 'q"CO co PCO 'Cr CO O LO CO CO CO V 'Cr CO o N- (C) f- c0 0 CO • 00ir` Lc)d c)i (O = M M M CO 00 CO CO CO O O O r O) Co CO CO O O N r` 011111 . 1 . 1 H CO cr LO 00 I,- O CO OLC) N- N V' O N L O N-• r` a0 CO N r• COCCO O N N 00 E CO O co CO O a- O M CO N CO N CO CO V LU O O7 a) (7) N CO CO U C000 i i O O O CO CC0 CMO O CO CMO C) (V CO N COCO ONi O CO CV a) -0▪ C J ~ Q O O 0 OOO LOCO00 CO CO CO CT) = J J c J J c J • y �$ J N �# A J U O e N N r` r N- N • O) i co i c M M V • L +-, M ((7 l.O r CO O C O CO O CO COO CO 00 O (flO V O CI3 CO O N a0 J • - Q C H• 0 W tn2 U0U U ' o c a c a Q LL Z Z Zwwwwwmm O H Z_ Z Z Z_ D D J Z J J J J I— I— C-09B 212-060-0 Junk Attachment SW Name MD Date Description C-09B 11612 5/18/2014 Milled CIBP C-09B 11615 12/28/2014 Milled CIBP TREE_ _ O 6-3/8"" CT/FMC C 0 9 B yygL{Ap= T� - S. .Y NOTES: WELL ANGLE>-70 8778'. ACVJATOR- BAKB2 C NITIAL KB.B 62.5' BEt3EV_ 331' _.---------41) KOP= 2800' 20"X 30"NSUL — 110' - 1982' —r SSSV OTIS LANDNG NP,D=5.962" Max Angle= 94° ' 10321' CONDUCTOR - Datum MD= 9950' J Datum TVD= 8800'SS I 2801' 9-5/8-DV PKR 13-3/8"CSG,720,L-80 BTRS,D=12.347" I— 2660' 8371' —IT ARROW PAC LTP w/SEAL STINGER ASSY,D=2.313"(10/24/12) 8379' --I2-7/8"X NP,D=2.313' H5.75•SCOOP GUIDE,D5.75' Minimum ID =2.313" @ 8371' _ Pt- 8384' —BTT G8'I 2 DEPLOY I B4T SLV 7" ARROW PAC LNR TOP PKR 1 !/ w/GSPROFLED3.70" • 8396' —3-1/2"PUP JONT,D=2.972" I 8406' H 3-1/2"OTE X NP.D=2.812" 7•TBG,26#,L-80 AB-U-4S,.0383 bpf,D=6.276" --8400' 8406' Hr FBR ASSY,D=? i i S 8429' H 9-5/8"X 7•GUB PKR,D=3.833• 11 8430' H 7'X 4-12'XO,D=3.958" 4-12"TBG, 12.80,L-80,.0152 bpf,D=3.958" H 8461' C3-e4 CUT TBG(05/03/02) TOP OF r LNR H 8487' 848T H9-5/8"X r LIP w I LNR FIGR,D=? 9-5/8"CSG,47#,L-80 BTRS,0=8.681 H 900T ►- 8760' H ESTIMATED TOP OF C .E fT 11; IN 3-12NR "L ,9.3#,L-80 STL,.0087 bpf,D=2.992' 9283' ,f ht FF • , WSTOCK(08/21/12) 9310' ►� 7'LNR,29#,L-80 BTRS,.0371 bpf,13=6.184" 9310' !fit �� 9283' —13-12'X 3-3/16"XO,D=2.786"J 3-1/4"LNR,6.6#,L-80 TCS.0079 bpf,D=2.850" H10488' 1j �• 4I~I ISI PERFORATION SUMMARY �';� 3.80"FALLOUT WINDOW(C-09B) 9310' -9324' l LOG:SLB MC3t 08/13/12 k� ' ANGLE AT TOP FERF:89°@ 10035' , Note:Refer to Production DB for historical perf data ' SIZE SPF INTERVAL Opn/Sgz SHOT SOZ ✓ 6 9990-10020 0 03/18/15 L,-- 10488' —13-3/16•X 2-7/8"XO,D=2.377" ✓ 6 10035-10155 0 12/30/14 2" 6 10050-10080 0 03/17/15 _ 10600' I--2-7/8" M D CEP(1229/14) 2" 6 10095-10125 0 03/17/15 2" 6 10550-10580 C 05/19/14 ✓ 6 10580- 10610 C 05/19/14 2" 6 10610-10640 C 05/18/14 , 2" 6 10890- 10920 C 01/04/13 , r 6 10960- 10990 C 01/04/13 , 2" 6 11280-11480 C 08/14/12 2" 6 11500-11600 C 08/14/12 `1 ? H F1SIt CEP MLLE)&REHED(12/28/14) 11612' —FISI-t CEP MLLE)&RJSI-®(05/18/14) H 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,D=2.441" — 11663' +, 11618' PBID DATE REV BY ODMMB•ITS DATE REV BY CX&MBJTS PR UDHOE BAY UNIT 10/12/79 RISE INITIAL COMPLETION 01/06/15 BLS/JMD FISWCBP/ADPBRFS(12/28-30/14) WELL: C-09B 05/14/02 N3S CTD SIDETRACK(C-08A) 01/15/15 PJC PERFORATION SY MBO1 LOCATION FERRET No:"2120600 08N6l12;NORDIC I CTD SIDETRACK(C-08B) 03/18/15 MS/PJC ADPERFS(03/17-03/18/15) AR No: 50-029-20366-02 01/28/13 PJC LW X NP CORRECTION SEC 19,T11 N,R14E 886'FNL&1223'Fa 07/02/13 TJ-VJMD LTP&X NP CORRECTION 05/22/14 LB/JMD P&L,SET CERADPERF(5/18-19/14) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable b direct inspection of the file. _ 1 02 - 0 420 Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RE AN: OVERSIZED: NOTES: Color Items: ❑/Maps: B,G�rayscale Items: Logs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: 2 BY: Maria Date: /G7/v /s/ WI Project Proofing BY: ACMDate: c9- d— /6 1st Scanning Preparation x 30 = __ +(00a.to = TOTAL PAGES 0(Count does not include cover sheet) BY: Date: 9'1 /5 /s/ Production Scanning 7 Stage 1 Page Count from Scanned File: R (Count does include cover et) Page Count Matches Number in Scanning Pre aration: YES NO BY: Maria Date: d—/X /cSr /s/'VI 19 Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO IY BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc i 0 O N ca E 9 a E En m E a co at tom') Z w E 0 - 0 > E 0. N '� an E > a w .N 0) fl. o N U a�'il 2 J O > E > cNi 9 5 } m C > y m w -c - o N O N O 'y N N C a a Li. >, N >. 0 .V) a -- a m- 0 N ZZ N Z z a a) O N o m + Lt_ N O m Y. ,- mt m co 0 rn 20 0 0 = m m CO N Z o m + m a-' w co a a m 03 03 03 c mca)Q o > aZ m d a n 0 9 0 0 0 O ` C .N+ Z O WZ L a J n0 o.J m U U U U U 0 o c a O LL a Cl- m :, a) 0 4= m a ui ai ai ai a Z c m ( z m mo a 2 a mc'a 0 ii ii ii ii 4' Y j a E � 0 ao as a u v v a)c m rn o .o N U4. a E �� 0 m�ca � E a. o 0 0 o E Q J U U z m 0 > a n > > E v v o 0 U 0 a) m a 0 m 1—o d 0 a� a� a� a� 0 Q E 0 20 2 2a �a 2 2a m w w w w 0 w N Q C M f") (h (h CO CO M M N N N N a w > N N N N N 0 N 0 03 N NNNN R U E W !L (4 i,--.5 N (D N (D CO fD (D (/) z Ce 0 i0 a r V V to to to to to no O O O O ala W X c C C C c c c C c W 0 00 d a) a) a) d N J IIa s a s a a > s a a O m /o i; ! ! !: ! 0 CC I 6512 0 0 o ac) to en O Ci-%41 V E a) Z U m Co J m Cl)U tY Z a o UZ o F- Z �0 J U U U U U To. 5 N _J / a) 'dQ CD W / 0 J y N N In N U ��p/� O 0ce ° I v/ 0 i / Q y I �Q a• o° -- T:).. a ZIa Q z E / Z w w ww .> '> '50 d U o0 > > E J .N .N 'N .V- .Vm 7I n a) a)z ( 0 a) > d n1 a a1 aa a 2222 d To d C C C C C C m m m m E I c E o C C o o m o 0 o 0 0 0 0 c co cc > > > > > > a m m m/ C) Z E > rn 0 z z c c 0 c c c 0 0 0 0 E v a.+ N N N 00 CO 00 00 W 00 0) 0) O) 0) C a) 0 P . 2 E - - w Co w W ao Co W N 2 o O y W Om z N N N N N N N N N N N N d W CC Q o m a a) a E E E z u. 0` two a • c °)'o '45 a a z y /� w I.L. w c � 2 U 0 0 0 0 0 0 0 )012 re E 1 a a to J _ 0 O w O w Q a m cn a 0 0 0 0 0 0 0 0 0 0 0 0 0 y (L 0. a -101-- I O H W J W J J W J J W W W W W Z ' [ T 1 , 1 ) 0 o 9 /*z/z/z o z >- > >- �' N N �. 0 C?N D r >. It) 2 C co < liFi; O to a 0 1 Z z L O E 0 a `° 1 Q a) a) `0 1 0 0 m 1 \ 0 0 J AlJ _ r 11 1 iii / ER rr ›-Q RI COi N Ce J O^ Z _ O ' ° m a. U O I I 1.` OJ a) 5) 1 m a i� E w a) a y U W w co I ZYCO Q r O N N O L co J a C a) 0 v E w 1 I O 2 U U I a 1 a N E /Q U = CO J CO > >- >- I- E / 0 I- E N O = N W C Z' )n a a fa W m W O F" E II '1 W0 as w \ ( ) D o cO I�iill` I a a) o .E a '�` Q d a) O E U t >. O 92 8 0 E m V o o im, �`z a) _ Q co tnZ >- >- } co lo N Eo 3 N cy o ,aa)) C) a) N Y .2 (0 O O , CI. a7 a) _ E a v' 0 1 E I a E o E I' E 0 oa) 1 0 0 1 2 a. 0 a C9 1 0 11 0 STATE OF ALASKA AL A OIL AND GAS CONSERVATION COMM )N REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon U Repair Well ❑ Plug Perforations 2 PerforateL Other E Mill CIBP Performed Alter Casing❑ Pull Tubing ❑ Stimulate-Frac ❑ Waived: Time Extension❑ I I Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WE 2 Operator 4.Well Class Before Work 5 Permit to Drill Number: BP Exploration(Alaska),Inc ' Name Development 0 Exploratory 212-060-0 3 Address P O Box 196612 Stratigraphic ❑ Service❑ 6.API Number Anchorage,AK 99519-6612 50-029-20366-02-00 7 Property Designation(Lease Number). 8 Well Name and Number ADL0028310 PBU C-09B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition SummaryRECEIVED Total Depth measured 11653 feet Plugs measured 10500 feet JAN 2 0 2015 true vertical 9034 76 feet Junk measured 11612/11615 feet Effective Depth measured 10500 feet Packer measured 8429 3 feet 11OGCC true vertical 9035.5 feet true vertical 7819 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 30 07-110 07 30 07-110 07 1490 470 Surface 2631 35 13-3/8"72#L-80 29.57-2660 92 29 57-2660.84 4930 2670 Intermediate 8982 69 9-5/8"47#L-80 28 8-9011 49 28 8-8360 69 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10035-10095 feet 10095-10155 feet 10550-10580 feet 10580-10610 feet _10610-10640 feet 10890-10920 feet 10960-10990 feet 11280-11480 feet 11500-11600 feet True Vertical depth 9027 42-9037 7 feet 9037 7-9039 99 feet 9035 8-9036 09 feet 9036 09-9036 05 feet 9036 05-9036 02 feet 9035.08-9035.98 feet 9035.72-9035 41 feet 9033 54-9036.98 feet 9037 37-9036.79 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) 7"Guiberson Polar Packer 8429 3 7819 Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation. 465 42577 96 720 952 Subsequent to operation Unable to POP wel 200 280 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory ❑ Development 0 Service El Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C O.Exempt N/A Contact Garry Catron Email Garrv.CatronCa.BP.Com Printed Name Garry Catron Title PDC PE Signature ifC Phone 564-4424 Date 1/19/2015 VT` //76/15" RBDMS V JAN 2 1 2015 /%2f0 - Form / //Form 10-404 Revised 10/2012 Submit Original Only d r Q o 0 e, 0 ,, 0 0 0 rC f� Lo N ; r� O Nt N.- O CO v LO U • % 0 0 ,, 0 m 0 0 0 O) N CO CO M V M • Nt 00 �O c- 0 O7 N V m (O CO V N- CO O L 00 CD CO Nr tt O CO O r� LO N- 00 O CO O M N ([) .1' 7„, C'M M M M CO CO V-CO CO O O CO N" 00 00 00 O) O) N N- i i i i I i i i H CO d' LO CD d r� op O CO O L[) ti N Nt O N M C() O f� O N ti r- co O) (O N M N r- 00 co O CV N co r- r- CD O) f- CD cp T- M O g M O OJCO N M O N M �O aD CO Lo O O) O) CD T- N 00 00 CI +c+ o2 AbdQ MV ti OD O 00 O O) CO a0 a0 CO(O CO M N M V (NJ 8 M (V V CNI OD OD CD OD C AO 0 J mJ Q CD C) nn � (X) CD J O -J J O J = J 00 00 C d 3# JNC 4t � 00 N co aOV C . N 00 in N O) N 00 V L_ LO LO 01 0)O 00 M O CO M O CO O CO O) N co V O C 00 ,-,C) CO c- N CD -J W H 0 W W U CO p CC CC C a. C LL Z Z Z W W W W W m �p O H Z_ Z Z_ Z_ j j j O ZF- CI_ 73 Z C c0 c I U CO ca m `n Q YU = o w � O U) 9 VI) _ E _ in = c o 7 m a_r () N 0 (n _Y - c0N (X , � rn 3ma .0 _0 ami --- a N CD rn 3 m 3 2 L m O i ii 0 pyo 0 a) m - o ' a O N a) +) c0 o c Uo on_ m oco _c � _a▪ _ _ "0 (u T- �. m � o (n o � Z, v = aoc- rn_ Uci coo a) co N a o . 0 N C a) 0 0 a o CD M 0 a m = 00 O N a 05 C C `- O a) Q N U O N Q cn , - J m o 0 a 0 E I O 0)0 0 o 0o O , - rn co a) > m _o Ca 0- = I- 0) oo co a) ° Ua 0 0 Z C > a^Z E ca) co if)oO 't -0 0 o o o � (0 a)�\ X c) a) c 2 D U CO a0i O)V a) ,- a O- 03 _ .c c0 - o O CO a) `� O C a) '- o 0 c o_= (I) CD_ (] i a) L (0 LLJ O = a coOa a) 2 (0 It o) a) o_,t o +, :� cm -cd -' C 0 , � c ,t � 0 a) CD - m - c4 .. a) 0 a in 1 c0 O) Q cT) c0 .0 LO c0 _D d a) c0 o) N c Q 2 N m a) o U N *k a3 a) Z C. DSI- Z oU2s ZZo �� a) Z c � � � TO M p O• M o O co O g " u- M N o 't n - ( > 0 co N C N o N 2 x �> N a) �N . > O cci) _ a) c a)t in >_ a) O)J .0 N C N co c0 0 ,- Z J V) Q a) 0 * Q m 0 N * o_ C ' > 3 .� * U) 0- X b >, a) O 0 to 0 -OI- > fn * .00 , a.* - - O � (nI u) i*, .0 "O - co cn0 ,- CD � Qa = 0 * _0 < = o j _ * nQ co a- m _0QN u> a) o c0 � Qa rn - 0 - •- •1- 0) 0_- -- � cAo � CD. CI: a�irno 3a Qte � a? acn x c0 13 tZo * CD comm Dao m � sz vo) N0) c m o oo� 2U_ 0 ,4 1- o Cr 0_ 3 .- Ce i i 0 >>_C -0 N u 0 C (n c0 N 1I 0 0 N u- U/) CO i i 0 U) - L * m 0 >+ 1-aC13) o � - (1) co �0 0 � I- a) - ' � Z v - a) 3 co In 0 w � Q , Cl 0Cl a. > v c(0) U 0 D_ N c = co UUi) 0 a 00 CI N o O) U 0 Q > N C 206 o 0 Un 1 U - ) - 3 T - Q 0 C o o To - • mU U) 0)200 0 1 = * , - a E � o o 0 r �* a) ~ c� w w a) a) , , c c a 0 c � � -Q � CN- � nj � c c = � 000 W 000 D \- cU) QN = `- i(� ON m - aiQ � Z c D aoi 3 U 0f 2U a) aorn (13 a) '� ) U * 0U o •� ('") L o_U as (nom rnN � cflco 02 _., c - c0 E Hf m v) * H -00 •EofX * H -0o a) * H 'D00 (Ni 0-* o o a) 5 * 00 - �n : 00o — , : U0mu @)c 3 3 : O02aCZ E : 000 a: IP . `. v v v ;.; o 0 0 o r I N N N N O s I� ;Ea () O N i N N N CO N N N N 4 IP \ 2$ 2% 5 / % \ 3 \ f 2 _ �f 25 = o t = \ e / 0_ 0 } .ƒ ® R / / � I \ 0 � .$ / \ \ / / � � 9 \ b ( 3 2 / f 2 CD 0 C) f/ 0 % / 0 \ - c �77 # A o o o 0- c Iz o . . g2 t � tE = n =_ § \ \ "oc \ km � 3 0 / — / ® % § w C o . c ° » clo 2 _ .o) a) 2 .2 0)c\i (N O \ oc 522222 / 0. G m & 7 o \ o I_ \ _Y = ) co b � / \ \ $ / o n t a a R CO •— / \ — / / 0_£ 3 [ { 0 m _ 4- a 4.° -§ / / 20 2 ± c 23 .7cf % oE t a a C G . a E o « \ o / ! ,- / D o 0 k • co c O. ~ © $ e & t ± 3 3 = $ c @ _/ R20-% _9RUE - 09 G � � 2 \ 0 - � 4� / 7 ƒ \ = 0 < / E= y < E \ a / o ( ®13 a 2 C CC a pƒ c / \ 0/ — \ \ o.\e § ± 5 6 G _ = o E \ § E \ \ \ \ / o / _ Ccm= 3 LQ 12 » c = E \ E ƒ \ ) \ / G \ c \ t o « / co /\ / ƒ � / // ƒ / / \ / \ 0 — ƒ - 0 0 g 7 10 7 ƒ - O O 2 D ! O O ± ± E 2 7 0 5 : Lc-) o \ \ % / TREE= '. 6-3)8"OCT/ C —0 9 B �.._.. WH-LHEAD= OCT/FMC I SA, NOTES: WELL ANGLE>—70°@ 9778'. ACTUATOR= BAKER C _ INITIAL KB.H__--------_.__.62.5' BE ELEV= 33.7' KOP= 2800' 20"X 30'NSUL 110' 1 1982' —17"SSSV OTIS LANDING NP,D=5.962' Max Angle= 94"@ 10321' AOR © , Datum ND= 9950' 1-11—i-6-0 .—F1-19-5/8- Datum TVD= 8800 SS 261—19 5l8'a/PICK 1 13 3/8"CSG,72#,1-80 BTRS,D=12.34-1'1—r 2660' 8371' r ARROW PAC LTP w/SEAL 1STMERASSY,D=2.313"(10/24/12) 8379' 1-12-7/8"X NP,D=2.313" 8384' —15.75"SCOOP GUIDE,D5.75" Minimum ID =2.313" @ 8371' g' - 7" ARROW PAC LNR TOP PKR s1 �/ 8384' —w/GSF BIT PROFIL2 E, 3.70" LV w/GSPROFL�D3.70" r 8396' —3-1/2"PUP JOINT,D=2.972' I I 8405' —I3-1/2"OTIS X NP.D=2.812" r TBG,26#,L-80 AB-U-4S,.0383 bpf,D=6.276" H —8400' —. 8406' Hr PBR ASSY,D=? . J Xr�7 8429' H9-5/8'X r GUB PKR,D=3.833' 8430' H7'X4-1/2"XO,D=3.958' 4-1/2'TBG,12.6#,L-80,.0152 bpf,D=3.958' H 8461' J\ C-EM CUT TBG(05/03/02) TOP OF 7"LNR H 8487' 8487' --I9-5/8"X r LTP w/LNR HGR,D=? p% 1 8760' --I ESTIMATED TOP OF CBvIENT 9-5/8"CSG,47#,L-80 BTRS,D=8.681' H 9007' r IL r. 3-1/2'LNR,9.3#,L-80 STL,.0087 bpf,D=2.992" —{ 9283' 1--:-..4. 9283' —{3-1/2'X3-3/16"XO,D=2.786" v.+ i Vr1 STOCK(08/21/12) 9310' 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" —{ 9310' ++ r,;i ►21' 3.80'MLLOUT WINDOW(C-09B) 9310' -9324' 3-1/4"LW,6.6#,L-80 TCI,.0079 bpf,13=2.850' --{ 10488' ' PERFORATION SUMMARY a REF LOG:SLB MCN..08/13/12 ANGLE AT TOP PERE:89"@ 10035' 10488' —I3-3/16"X 2-7/8"XO,D=2.377" Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2' 6 10035-10155 0 12/30/14 _ 10600' I--{2-7/8'WFDCOP(12/29/14) 2" 6 10550-10580 C 05/19/14 2" 6 10580-10610 C 05/19/14 2" 6 10610-10640 C 05/18/14 2" 6 10890-10920 C 01/04/13 , 2" 6 10960-10990 C 01/04/13 , 2" 6 11280-11480 C 08/14/12 2" 6 11500-11600 C 08/14/12 I ? H FISH:CEP ALL®&PUSH®(12/28/14) 11612' H RSH:CEP ALL®&PUSHED(05/18/14) 2-7/8'LNR,6.4#,L-80 STL,.0058 bpf,D=2.441" I— 11653' \ 11618' I-1 PSTD DATE REV BY I CO J UMTS DATE REV BY COMMENTS PRIDFOE BAY LW 10/12/79 N18E IMTIAL COMPLETION 01/06/15 BLS/JMD FISHCBR'ADPERFS(12/28-30/14) WELL: 0.098 05/14/02 N3S CTD SIDETRACK(C-08A) _01/15/15 PJC PERFORATION SYMBOL LOCATION PERMIT No: 2120600 08/16/12 NORDIC 1 CTD SIDETRACK(C-08B) API No: 50-029-20366-02 01/28/13 PJC LTP X NP CORRECTION SEC 19,T11 N,R14E,886'FNL&1223'FEL 07/16/13 TJWJIVD LTPXNIP CORRECTION(07/02/13) 05/22/14 LB/JMD MLI.,SETCBP/ADPERF(5/18-19/14) BP Exploration(Alaska) STATE OF ALASKA AL AND GAS CONSERVATION COMM A* REP R OF SUNDRY WELL OPERATIONS 1 Operations Abandon U Repair Wein Plug Perforations U Perforate[] Other[] MITI CIBP Performed Alter Casing❑ Pull TubinL] Stimulate-Frac ❑ Waiver❑ Time Extension Change Approved Program El Operat.Shutdown❑ Stimulate-Other El Re-enter Suspended Wel: 2 Operator 4 Well Class Before Work 5 Permit to Drill Number BP Exploration(Alaska),Inc Name. Developmen0 Exploratory 212-060-0 3 Address P O Box 196612 Stratigraphi0 Service El 6.API Number Anchorage,AK 99519-6612 50-029-20366-02-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028310 PBU C-09B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071): 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11653 feet Plugs measured 10864 feet E C E I N E D true vertical 9034 76 feet Junk measured 11612 feet JUN 12 2 014 Effective Depth measured 10864 feet Packer measured 8429 feet n ��� true vertical 9034.25 feet true vertical 7818 73 feet �l"�! rC Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 29-109 29-109 1490 470 Surface 2631 13-3/8"72#L-80 30-2661 30-2660.92 4930 2670 Intermediate 8983 9-5/8"47#L-80 24-9007 24-8356 51 6870 4760 Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10550-10580 feet 10580-10610 feet 10610-10640 feet 10890-10920 feet 10960-10990 feet 11280-11480 feet 11500-11600 feet True Vertical depth 9035.8-9036 09_ feet 9036.09-9036 05 feet 9036 05-9036 02 feet 9035 08-9035 98 feet 9035 72-9035 41 feet 9033 54-9036 98 feet 9037 37-9036 79 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) 7818 73 8429 7818 73 Packer None None None SSSV 12 Stimulation or cement squeeze summary ' Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 434 24000 91 0 1072 Subsequent to operation 787 30002 162 0 941 14.Attachments: 15.Well Class after work. Copies of Logs and Surveys Run Explorator❑ Development[] Service❑ Stratigraphic El Daily Report of Well Operations X 16 Well Status after work: Oil [] Gas El WDSP❑ GSTOR El WINJ ❑ WAG El GINJ El SUSP El SPLUC 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt: N/A Contact Garry Catron Email Garry.Catron(c�BP.Com Printed Name Garry Catron Title PDC PE Signature )14,4. f L.K/41 Phone 564-4424 Date 6/12/2014 VLF 4. !cgl0-- RRDMS JUN 13 20 Form 10-404 Revised 10/2012 Submit Original Only cn QOOMo 8000 -4- ti ,. N LO N- (,) Tr m � c• opOCCOO O - N 00 a- CO 000Nc) v co0r- r. a) r� v co r- uivococo toOMMMOo � � co c0 O O (0 coo) co co O O N 7 P CflC) O O Tr (NI N cri O a NNr (hMNN 00CfD 0 00 O N- o M O O M O E O O O CO CO� CO C.) O Q O Nr CO 00 „zr O co co N NNc0 CONI- N(00 0)) O (7 N co = 0 r 0 � J 0 0 0 4# J N J It 4* N ti N CtiN r — r— . r— o %_•=z- CV N O M N 4 t CD CCOONON (0C) 0C)) cu CO OO OO N 00 W C Q C1— o Uw (jO IDQLLZZ Z W W W W W m m Q F Z Z Z Z D D D U Z J J J J U) H H 0110 v715 ill _1 _ i D C -6 - ojf ,- J O O (n a) a) a) (o _ o6 o) m aci HH O < a) a) -0 co E Q °' c°) L O cm o mom — E enU c N CD o .cd UUYH ay • Co a) ca a2 -0 = 00 � •co ai E c) O (-0 = N Q'-O ta >-. _c 0") m o (0 -0 U O j N m e O (o V ?�as `n O m L N 1,2 ~ o (p6 E_0 (0 Lo Q d "- _c (0 > N U d a)C n a) p a) N C m O V7 p c) C p p C a- a - C p O (n j — =_ U L -C C L n Q) CO Q ° c (o a) E o " a _J c co E0 O a) Y (0 O C OO (0 ,- Ocr) • 0 C) � � ^mom > co a) a >, .e m io 0 c -I- C •. U C. 0 c• a C co a) o. (fl O O C E 0_ a) d O N g O > O N O ..O a d c 0 5 . O N 0 a) ai oma -9 _ 3 - cco o E � a) N -c E C Y o) O U O 0 E O O- p) •N O .( 0 -O to c) - (0Qco C EN c _ H -o C ( N0 o O c4 (0 — H N > co a) (0 .c C CO Co 05 O 1._ E Q O C L > o) co Q O (0 cn O (0 O c _ C a) Q w * c Z m o E ch o 3 = ° E — * �_ m 03 p _m E (n O • o cc J Cn O O Q a) }' fl O J U a U O J0 * M N N o 'p a E Lo o ib Y U) N H - co C C) O Lo GD CO Z o Z 0 c Uv— (o = a� 3 N Z pp <�l U Q o .- N ,t 3 t co C C . .� .- N O t d CV o O a(>>n O a) a) � C O 'a � m •- O a) � E 0 O in• fl Y � in o ch o � E _ � � � n� Q � N. � � � D V" J EP _ o 0 O ,- 5 a) = co (o O N .Q -a = v7 N . i d a. ,_ 0 fl < . c -0 < b . o c a. § O a) E o O)-- .n Q o �c a) — ' 0 0 Q (3). LI- E O 0") 0--- O a 2 N cnLO o aE c 0p0- -0 _ ^O - LO (") U (0 m ``) U `� Z ` L.L > o � U a) ch0mU -- � (cac�io C cc i 1 (L° c u o ; ° L N z °' E o • H e 11 C o U c o > a p .0 > a (n a) (`) in ~ E > a) U = c © ©J A f- O) (--) c H (n O O p` Q.c -o c Q-.p co 't m 'C H (n m O D o a- a) UU E O (o (o a) a) 0- U 0 (n cc io en c ca E 0 a - _c O _0 OL > >oD c a0U a_ 1Ep E 0 H CO 3 H m i9 o) E o7 C D 0 .- H c0 Ear � a) � v c U U = v) V U x- o c o — Y2rn p a) , uUi U U Q 3 a �� (n o U To = N To - ,- _c CO O 2 o ai N .c a) -a o a) io = o)L O d E ,_ 2 ce rn 2 Y a) o) o 0 u) = E D 0) 2 .E — o o X o m Ui ai a ai ami �'ai E a� o Q oa)U E n3 a 0 0 H Q L_ m 3 CL u) c 3 a o o a o cn C 5 C c 3 a o Q o _ " O o 4t Im ° � o a) 0 < E i \ a = E / o,- % 0 E - -o = c © 2 % % - g % / t \\ E II \ 7 ƒ < \ ± 2 / E E % / / @ 2 0 f7 � / /\ 2 \c . m RS s 2 / = n z k / ° r ® / E» O # _ 5 0- t D = f es ..,Ca ® c cm t * I / co \ \ \ % U) / \ ƒ 6 $ N ca. -0 o0e > ± ® - \ co f ) $ \ \ O X X o Z o o E * $ I \ k $ / $ « Lo — e , m vi \ \ / / \ / 2 / / c ,_ U » < o § 6 2 = \ \ ¥ / o m / _ 2 o .- 4- E t as 2a •0 / / E c f / \ E 21 @ c e 5 + f 2 = & < 0. k# _ = 3 7 ) .§ - . 6 O o ° = . ° ° •- / CO 4- CO CO f f \ \ \ z / $ \ % ° m o � _ 0 = = m w o g / »2 \ 0 ) / % \ k \ @ E \ ƒ E o 4- 4::) -(1)- E ± o 7 § a= 0 E 5 E % / y O ° 6 £ 4 0 2 % o « / ,-- t < _o SEE .@ g m £ 2 ® = f \ a e 0. • O e % c .E I m C) o E .c @ 7 6 ? 6 ® / __ O k/ \ 3 Ce II n ° 0 1 1 . 2 e m o " = / \ QD f gl E \ 0 - 7 \ \ - ° =■ — c 6 0 = g -£ $ $ n ® » o o_ E R o- c E e _ CI / \ / / \ \ r _ / -. E a \ x- G \ \ - t % c 3 \ $ \ \ a E E $ / \ & / / \ \ \ c / / Ct /\ k c \ f •- cn f / k © / \ \ § f © S ) 0 / / / % C U ® o o = 'al ® m .c u c o 0 2 E / _ R i t m o £ = c _ 1g o ) E m . O m o o x - e 0 o = o - e m L0 1.! E o o 15 : 0 -30 o c w w O r : / / / 0 e 11-6 in TREE= -6-3/8"OCT/FMC yyD_J-EAD= OGT/p -O SA S: WELL ANGLE>-70°@ 9778'. ACTUATOR= BAKER C NTIAL KB.B 62.5' BF.ELEV= 33.7' KOP= 2800' _.-----'----11) Max Angle= 94'6 10321' 20"X 30"NSUL H 110' 1982' H7"SSSV OTIS LANDING MP,D=5.962" Datum 143= 9950' CONDUCTOR Datum TVD= 8800'SS 260t -�9-5/8"DV PKR 8371' r ARROW PAC LTPw/SEAL 13 318"CSG,72#,L-80 BTRS,D=12.347" - 2660' 1 1 SINGER ASSY,D=2.313"(10/24/12) 8379' H2-7/8"X NP,D=2.313' ----- -- 8384' -{5.75"SCOOP GUIDE,D 5.75" Minimum ID =2.313" a@ 8371' S (7" ARROW PAC LNR TOP PKR // 8 � -BTT GBN OFLE,2 3.70" SLV w/GSPROFLE,D3.70" 8396' H3-1/2"PUP JOINT,D=2.972" ' 8405 H3-1/2"OTIS X NP.D=2.812" 7"TBG,26#,L-80 AB-LI-4S,.0383 bpf,D=6.276" --I -8400' ...iJ- 8406' H7"PBR ASSY,D=? 8429' -19-5/8"X 7"CUB PKR,D=3.833" 8430' Hr X 4-12"XO,D=3.958" 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" r 8461'CHEM CUT TBG(05/03/02) 1 TOP OF 7"LNR H 8487' _ 8487' -I9-518"X7"LTP w/LNR HGR,Co=? P 8760' -ESTIMATED TOP OF CEM3YT • 9-5/8"CSG,47#,L-80 BTRS,D=8.681' -{ 9007' , j IL • I1 t 3-1/2'LNR,9.3#,L-80 STL,.0087 bpf,D=2.992' -I 9283' >> I• 9283' -13-12"X 3-3/16'XO,D=2.786"I ISI %' I44 I44 WFIPSTOCK(08/21/12) H 9310' �I` I; II 7'LNR,29#,L-80 BTRS,.0371 bpf,D=6.184' H 9310' I " 3.80"MLLOUT WINDOW(C-09B) 9310' -9324' i, 3-1/4"LNR,6.6#,L-80 TCI,.0079 bpf,D --I=2.850" 104$$' !► PERFORATION SUMMARY REF LOG:SLB MCPL 08/13/12 ANGLE AT TOP FERE 89"N 10550' % 10488' H3-3/16"X 2-7/8"XO,D=2.377' Nate:Refer to Production DB for historical perf data I SIZE SFF NTERVAL Opn/Sgz SHOT SQZ I 2" 6 10550-10580 0 05/19/14 2" 6 10580-10610 0 05/19/14 10864' H2-7/8-V FD CFSP(05118/14) 2" 6 10610-10640 0 05/18/14 .4.., 2" 6 10890-10920 C 01/04/13 2' 6 10960-10990 C 01/04/13 2' 6 11280-11480 C 08/14/12 2' 6 11500-11600 C 08/14/12 1 11612 -J Fisti CEP MLL®a PUSHED(05/18/14) PBTD 1771619 - ► 2-7/8"LNR,6.4#,1-80 SIL,.0058 bpf,D-2.441' H 11663' DATE REV BY COMMENTS DATE REV BY COMA:NTS PRUDHOE BAY UNIT 10/12/79 NI8E IMTIAL COMPLETION 01/27/13 RCR/PJC DRLG SNS WELL: C-09B 05/14/02 N3S CTD SIDETRACK(C-08A) 01/28/13 PJC LTP X NP CORRECTION PERMT No: 2120600 08/16/12 NORDIC 1 CTD SIDETRACK(C-08B) 07/16/13 TJWJI/D LTP X NP CORRECTION(07102/13) AR No: 50-029-20366-02 08/17/12 PJC DRLG DRAFT CORRECTIONS 05/22/14 LB/JMD MLL,SET CBRADPE2FS(5/18.19/14) SEC 19,711N,R14E,886'FNL&1223'FEL 11/12/12 BSB PJC ARROW PAC LTP(1024/12) 01/17/13 TTR/JMD CEP&ADPERFS(01/03-04/13) BP Exploration(Alaska) PRINT DISTRIBUTION LIST BAKER � © 6 2093 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) 21^L^k v^ WELL NAME C RUN NUMBER (mandatory) ZC� I FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL CD -• (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Or F'HIN I S #OF COPIES #OF COPIES -11 BP Exploration(Alaska)Inc. I I 3 j 1 I I I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 1ConocePhillips Alaska Inc. I I 1 1 I I 'Attn Ricky Elgarico 1PO Box 100360 'Anchorage,Alaska 99510 t— 3 ExxonMobil,Alaska Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC r I 1 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 1DNR-Division of Oil&Gas I I 1 I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 .• N ,- Wes Flit" B*KER PRINT DIST I':I IVUTION LEST o 6 2013 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME G" aCIZ P•---6-\ RUN NUMBER 2—V2--CDGO (mandatory) FIELD Prudhoe Bay BH SALESMAN O&echukwu(®Ivey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Enc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY ( FIEU3 ANAL_ co digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Ur F'HIN I S n#OF COPIES q#OF COPIES A 4 U 4 - Si. 4 -0- 1 BP Exploration(Alaska)Inc_ 1 1 3 1 1 1 I Petrotechnical Data Center LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 21ConocoPhillips Alaska Inc. 1 1 I 1 1 I J (Attu Ricky Elgarico { IPO Box 100360 i {Anchorage,Alaska 99510 3 ExxonMobil,Alaska -----1-----1-71--f—T-1------1--- Ann 1IAttn Lynda NL Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 1 4 1s to of Alaska-AOGCC I 1 I i I 1 I aI Christine Shartzer 333 West 7th Aye,Suite 100 1 Anchorage,Alaska 99501 i 5DNR-Division of Oil&Gas L. i 1 1 1 1 1 Attn:Sean Clifton 550 W.7th Ave,Suite 800 1Anchorage,Alaska 99501 1 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 > l0 CO '0 X T S �y D N W O .t.6* n O v m = In _ 10 d _ O d r Z: 01 • o ° • rn rn W 0 0 D 0o C) w w 0 Ls , 7 Z3 z 7 DC v, Z7 c 00 00 W A Q> A C t0 .i ? N • E co :Tao rD rto cu fp D o N - CO CO C) W D 0' D CO 1:) D D m > = CD m oma j N OJ l0 - n v La co vl N N C -67 u-i O sz °=° 00000000000030 0w a CD 00 CD X W m Q W N N c X -0i * A D • o a"; 0 0 N n WT. 'r1 D > i ,..,71' 2 -1 p o CD � 0 0 0 0 0 0 0 0 0 0 0 0 0 00 aI1 -< 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • Ei 0) 0 0 0 0 0 0 0 N . 0 — O mCA 00 a) CWO N O en t00 N 0) --a v CCT :0 a It a Men • C!1 O X in 7, D 0 D -I XXXXX X X X X tia Z m NJ l0 0 k X X X cn -1 cn W c! NJ N 00 W 0 3 0 3 In 3 13 "or 3 3 r -0 Z 2 z g E M m r Z 3 0 0 X r- r r -1 0 0 r O m O 73 X -< m _ 3 -r 4114 ... W � 111 D C F 1 X N — � — W N N — N G1 (o (A c ID n G CD 0 v 0 0 0 0 v up W � to - ` O Z S rD k k i k L L L k D Al 6 L to 111 p1 fla r ; N El 01 N 3 3 7 ,� an 1S a 7 3 m ,'.? Q ►� pi • co C W W W W W W W W N W N W 90 W MMS D NJ Lri C YV m Q v' O W 0 � 2 .,3. 4' -- _ ;:°( n n, tD N •< z O '! C o z F ..• 13.)o El. 6. z O '-+ (6 • H 1 . . . _..1 — _a — . — — .0 0 0 0 0 0 0 0 0 0 0 0 0O . 0000000000000 /O co p' U1 0 McMains, Stephen E (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Friday, February 01, 2013 10:14 AM To: McMains, Stephen E (DOA); Ferguson, Victoria L (DOA); Schwartz, Guy L (DOA) Subject: C-09B PTD#212-060 Hello, After an internal discussion, it has been agreed that the submitted completion date is incorrect. Due to production before the liner top packer being set which was the date used for completion, we would like to change the original completion date to August 15, 2012. Please let me know if you would like a revised 10-407 submitted to reflect the change or if this email is sufficient. If you have any questions, please don't hesitate to let me know. Thank you, Joe Lastufka Alaska Wells Technologist Cell: (907) 227-84961 Office: (907) 564-4091 VV • BP Exploration Alaska1900 E. Benson Blvd.IRoom: 788DlAnchorage,AK 1 DECEIVED • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM' )N JAN 2 4 2013 • REPORT OF SUNDRY WELL OPERATIONS AOGCC 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time ExtensionD Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work 5 Permit to Drill Number. Name BP Exploration(Alaska),Inc Development Exploratory ❑ - 212-060-0 3 Address P O Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 - 50-029-20366-02-00 7 Property Designation(Lease Number) -41-113 Well Name and Number , ADL0028310 -� A 330,5- 1 AS PBU C-09B 9 Logs(List logs and submit electronic and printed data per 20AAC25.071) 10 Field/Pool(s) To Be Submitted PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11653 feet Plugs measured 11262 feet true vertical 9034 76 feet Junk measured None feet Effective Depth measured 11262 feet Packer measured See Attachment feet true vertical 9032 92 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"91 5#H-40 29-109 29-109 1490 470 Surface 2630 13-3/8"72#L-80 30-2660 30-2659 92 4930 2670 Intermediate None None None None None None Production 8983 9-5/8"47#L-80 24-9007 24-8356 51 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10890-10920 feet 10960-10990 feet 11280-11480 feet 11500-11600 feet True Vertical depth 9035 08-9035 98 feet 9035 72-9035 41 feet 9033 54-9036 98 feet 9037 37-9036 79 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 627 44149 91 0 1062 Subsequent to operation 346 1722 44 0 213 14 Attachments 15.Well Class after work Copies of Logs and Surveys Run Exploratory❑ Development D ' Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil,, U Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUc4 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita.Summerhays(a�bp.com Printed Name Nita Summer s Title Petrotechnical Data Technician i ignatur ` ���/� /�/ �e/j,� —.00.- Phone 564-4035 Date 1/23/2013 RBDMS JAN 2 8 :I13 0P7/1--) V1-F `i'r3/� Form 10-404 Revised 10/2012 Submit Original Only TREE_ ' 6-3/8"OCT/FMC WELLHEAD= OCT/FRAC SAL _ NOTES: WELL ANGLE>-70°@ 9778'. AtnwTOR= BA/441C PJC DRAFT C -0 9 B KB.ELEV= 62.48' BF.REV= 33.7' 1 KOP= 2800' Mix Angle= 94'@ 10321' 20"X 30"19SUL 110' L. 1982' H7"SSSV OTIS LANDING MP D=5.962" Datum IC= 9950' CONDUCTOR Datum TVD= 8800'SS 2601' 9-5/8"DV R<R 13-3/8"CSG,72#,L-80 BTRS,D=1-2-.3-4-7-1" -I- 2660' I 8371' 1r ARROW PAC LTPw/SEAL SINGER ASSY,D=2.313"(10/24/12) 8384' -15.75"SCOOP GUIDE,D 5.75" Minimum ID =2.313" @ 8371' 8384' BTT GEN 2 DEPLOYMENT SLV 7" ARROW PAC LNR TOP PKR 1w/GSPROFILE.03.70" 8396' H3-1/2'RP JOINT,D=2.972" ' L 8405' H3-1/2"OTIS X NP.D=2.812" 7"TBG,26#,L-80 AB-U 4S,.0383 bpf,D=6.276" H -8400' j 8406' H7"PBR ASSY,0=? k8429' -1 9-5/8"X 7"GUB PKR,0=3.833" 11 8430' H7"X 4-1/2"XO,D=3.958" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,D=3.958" H 8461' 1 CHEM CUT TBG(05/03/02) TOP CF 7"LNR H 8487' II 8487' H9-5/8'X 7"LTP w I LNR HGR,D=? U., 8750' --I ESTMAT®TOP OF CEMENT I. 9-5/8'CSG,47#,L-80 BTRS,D=8.681' 9007' I I ►I� I. 3-1/2*LNR,9.2#,L-80 SIL,.0087 bpf,D=2.992' -) 9283' ``4 � 9283' H 3-1/2"X 3-3/16"XO,D=2.786'I II I ►ISI I WHIPSTOCK(08/21/12) -I 9310' ,I`I I, I/ I. 7'LNR 29#,L-80 BTRS,.0371 bpf,D=6.184' --I 9310' �I'd 3.80"MLLOUT WINDOW(C-09B) 9310' -9321' li PERFORATION SUMMARY Fill LOG: ????? ANGLE AT TOP PERF:88'it 10890' Note:Refer to Roduction DB for historical perf data , 10488' H3-3/16"X 2-7/8'XO,ID=2.377"I S" 6 089 1/A N SHO SQZ 7'r-- 6" 10890-�(fjg20 /04/13 2" 6 10960-10990 0 01 '. 13 ( �� 2" 6 11500-11600 C 08/14/12 i 11262' H2-718"WFD CBP(01/03/13) 3-1/4"LNR,6.6#,L-80 TCR,.0079 bpf,D=2.850' ---I 10488' J FBTD -- 11618' .. 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,D=2.441" H 11653' DATE Fi V BY COMB'/TS DATE REV BY COMbBJTS PRUDHOE BAY LMT 1W12179 1418E INITIAL COMPLETION WELL- C-09B 05/14/02 N3S CTDSIDETRACK(C-08A) FERMI.No: 120600 08/16/12 NORDIC 1 CTD SIDETRACK(C-08B) AR No: 50-029-20366-02 08/17/12' PJC DRG DRAFT CORRECTDINS SEC 19,T11t' R14E,886'FML&1223'FEL 11/12/12 BSE/PJC SET ARROW PAC LIP(10/24/12) 01/17/13 TTR/JA+D SET CBP 8 ADPERFS(01/03.04/13) BP Exploration(Alaska) Daily Report of Well Operations ADL0028310 GALS 8390 N2 8390-TOTAL • Noc) co 0 0 0 0 0 — V O O N CO V LC) C N v N LO N- C.) 0 o) O c 0 o o t CO 3 v p CO 00 00 O) N CO - CO CO V N- O CO CO N CO 6) LO O LO 00 LO Cr) f- CO O CO CO LP) V CO CA CO 00 V CO M LO LC) V CO CO O O CO CO CO CO CO CO O) O) CO N N- N- O i i ! fell H Ln CO LO LO CO O 00 (Ni M O V O O N. N 00 r M (Ni M N N- CO CO O 00 CO O) f� CD 00 00 N V O CO N N CO O CO V V CA O aO O) N CO CO V . r M rn co co N N CO 00 coVN O N COO N co 0 � J H Q 0 O � co � 00co � occ = J o0 J J J cc • N J N �$ J N O • N • O OC) co CO V- (/) CSO UN N CO 60 o0 00 N _ O LO M N N M M N O V t +' to N co O co O CO V O CO co co O co C 00 O M N O) CO V N CA r- 00 N co E O .Eo OU0 C6oz V z W W W w O m m O z_ z_ z_ z_ a J D J U J J J J CL (n f--- Packers and SSV's Attachment ADL0028310 SW Name Type MD TVD Depscription C-09B PACKER 2601 2538.42 9-5/8" DV Packer C-09B PACKER 8429 7756.23 7" Guiberson Polar Packer Daily Report of Well Operations ADL0028310 CTU #3 1.75" CT. Job Scope: Run jewelry log, set CIBP,Addperfs RU and perform BOP test. LRS FP FL and tubing. MU WFD MHA w/ PDS GR/CCL logging tools and a 2.25" DJSN. Drift down to 11,290' clean. Log up at 50fpm from 8300-11290'. POOH. Flagged coil red/white at 11210'. 1/2/2013 <<<Job continued on 1/3/12 WSR>>> T/I/O= 2450/480/380 Assist CTU . Freeze protect flowline with 12 bbls neat meth and 137 bbls crude per WOA F/P procedure. F/P tubing with 80 bbls crude. Final WHP = 1/2/2013 2140/380/220. CTU on well at departure. CTU #3 1.75" CT. Job Scope: Set CIBP, Addperfs <<<Job continued from 1/2/13>» POOH w/ PDS logging tools. Process logging data, +85' correction. MU WFD 2-7/8" CIBP and RIH. Launch 1/2" aluminum ball and set CIBP at 11262'. POOH. RIH with 30' x 2" PJ2006-HMX, 6 spf TCP perf gun, shoot 10960 to 10990', POOH. Recover ball. MU 30' x 2" PJ2006-HMX, 6 spf TCP perf gun, 1/3/2013 <<<Job continued on 1/4/13 WSR>>> T/I/O = 280/480/380. Temp = SI. SLB coil#3 call in (TBG FL) TBG FL @ —2634'. SLB in control of well upon departure. 1/4/2013 1550 CTU #3 1.75" CT. Job Scope: Set CIBP,Addperfs RIH w/30' x 2" PJ2006-HMX, 6 spf TCP perf gun. Tag CIBP @ 11262' and correct depth. Shoot interval 10890'-10920'. POOH. Recovered ball. Stack injector, BOPs and PT tree cap. POP well and monitor for flow. Perform chain inspection and replace packoff. Standby for well flow evaluation. Continued on 01/05/13 WSR 1/4/2013 CTU #3 1.75" C I. Job Scope: Set CIBP,Addperfs PCC back flowing on well, unsuccessful POPing. Attempted to flow to open top tanks, unsuccessful. RU nitrogen crew and PT. MU 2.65" JSN for N2 lift and PT PCE. Displace 60/40 methanol out of coil down flowline. Test seperator not available for N2 lift. RIH pumping N2 at 500scfm making frequent stops to let well unload. At 5800', increase N2 rate to 700 scf/m. Lift to 7100', cut N2 to 500 scf, died. Increase rate to 700 scf, lift to 8200'. 1/5/2013 «<Job continued on 1/6/13 WSR>>> CTU #3 1.75" CT. Job Scope: Set CIBP,Addperfs Pumping N2 @ 700 scf. Lift down to 8200' and/7600' tvd. Pull back to 7600' and/7100' tvd. Go back to 8200'. Put well in test, see log for details. Out of N2, begin POOH. RDMO. Last test results 850bopd, 100bwpd, 1 MMscfd. Notified Wells Support to leave double swab on well until further notice. 1/6/2013 «<Job complete>>> FLUIDS PUMPED BBLS 12 METH 217 CRUDE 75 1%KCL 154 60/40 METH 458 TOTAL FLUIDS PUMPED bp Date 14-DEC-2012 Transmittal Number: 93270 Fitt;it/V ED BPXA WELL DATA TRANSMITTAL DEC 14 2012 Enclosed are the materials listed below. AOGCC (BPXA FIELD LOG DATA) If you have any questions,please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Field Log Data& Electronic Log Prints for the following wells: B-27B '2-x,2 k3"73 C-03C 5%l2`Z C-03CPB1- C-09B ��-- Z\Z � 0)22$Z c� C-09BPB1 C-246 C-24BPB1 S-12B :\ )12-2-1-1 2- S-32A Z\Z 0562. 2-25.).1 / S-37A 22.,225.4 S-37APB1 -3 Z-34 2\2-O )2_2.-61 D 1LX- / oZ, f 3,' 1 37 401 I I, Please Sign and Return`ene copy of this transmittal. Thank You, Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 RECEIVED STATE OF ALASKA NOV 15 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC WELL COMPLETION OR RECOMPLETION REPORT AND LOG AOGCC 1 a. Well Status' ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One ' ®Development 0 Service 2. Operator Name: 5 Date om .,Susp.,orAband: .3./Y) 12. Permit to Drill Number: BP Exploration(Alaska) Inc. S (S M7244012 2(5 212-060 • 3. Address: 6 Date Spudded: 13. API Number. P.O. Box 196612,Anchorage,Alaska 99519-6612 8/3/2012 50-029-20366-02-00 4a. Location of Well(Governmental Section): 7.Date T.D. Reached: 14. Well Name and Number: Surface: 8/10/2012 PBU C-09B • 885' FNL, 1223' FEL, Sec. 19,T11N, R14E, UM 8. KB(ft above MSL): 62.50' 15. Field/Pool(s) Top of Productive Horizon' 3791' FNL, 365' FEL, Sec. 19,T11N, R14E, UM GL(ft above MSL): 32.58' . Prudhoe Bay/Prudhoe Bay Total Depth. 9. Plug Back Depth(MD+TVD) 7' FNL, 1372' FEL, Sec. 30,T11N, R14E, UM 11618' 9036' 4b Location of Well(State Base Plane Coordinates,NAD: 10 Total Depth(MD+TVD) 16. Property Designation: , Surface: x- 664145 - y- 5960329 ' Zone- ASP4 - 11653' 9035' . ADL 028305&28310 TPI. x- 665077 y- 5957443 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 664108 y- 5955925 Zone- ASP4 None 18 Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25 050) N/A ft MSL 1900' (Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071). 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 9316' 8643' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface, 110' 36" 12.9 cu yds Permafrost Concrete 13-3/8" 72# L-80 Surface 2660' Surface 2660' 17-1/2" 4147 cu ft Arctic Set II 9-5/8" 47# L-80 Surface 9007' Surface 8357' 12-1/4" 1227 cu ft Class'G', 130 cu ft Arctic Set 7" 29# 1 L-80 8487' 9316' 7873' 8643' 8-1/2" 396 cu ft Class'G' 3-1/2"x 3-1/4" 9.2#/6.6# I L-80 8371' 11653' 7765' 9035' 4-1/4"x4-1/8" 189 sx Class'G' x 2-7/8" /6.5# • 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD (MD+TVD of Top&Bottom,Perforation Size and Number)' ) 2"Gun Diameter,6 spf 7",26#, L-80 8429' 8429'/7819' 4-1/2", 12.6#, L-80 8461' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11280'-11480' 9034'-9037' WAS HYDRAULIC FRACTURING USED DURING COMPLETION? 0 Yes ®No 11500'-11600' 9037'-9037' -L•' .=" !'.4'1 ' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED t; It V 2500' Freeze Protect w/79 Bbls of Diesel 74 i -• -- 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc September 1,2012 Flowing Date of Test Hours Tested Production For OIL-BBL. GAS-MCF WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 10/30/2012 4 Test Period 4 97 6733 1 60 69829 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL' OIL GRAVITY-API(CORR): Press. 1390 170 24-Hour Rate 4 579 - 40397 . 4 36.7 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No • Sidewall Core(s)Acquired? 0 Yes ®No , If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None! 5 NOV 1 9 2012 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE v L'F , Submit Original Only v �1�113 /�L/ 7 fit) XD� IL i3 G 29. GEOLOGIC MARKERS(List all formations ar erkers encounter 30. FORMATION TESTS NAME .J TVD Well Tested': _]Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071 43SB 9331' 8657' None 42SB/Zone 4 9370' 8692' CGL/Zone 3 9430' 8744' Base of CGL/Zone 2C 9475' 8780' 23SB/Zone 2B 9584' 8859' 22TS 9638' 8892' 21 TS/Zone 2A 9742' 8941' Zone 1B 10131' 9039' 21 TS/Zone 2A(From Base) 10348' 9040' Formation at Total Depth: Zone 2A(From Base) 10348' 9040' 31.List of Attachment. Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Contact. - Ross,564 rpssmo@bp.com Email: lastufjn@bp.com rsmo@bp.com Printed Name: :stu Title. Drilling Technologist .- Signator- Phone 564-4091 Date: '�/15/12 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and teases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071 Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25 071 Form 10-407 Revised 10/2012 Submit Original Only TREE= 6-318"OCT/FMC WELLHEAD= OCT/FMC SA 'NOTES: W ELL ANGLE>—70°@ 9778'. ACTUATOR= BAKER C PJC DRAFT C-09B KB.ELEV= 62.48' BF ELEV= 33.7' ,1I KOP= 2800' / Max Angle= 94°@ 10321' 20"X 30"INSUL — 110" © 1982' —17"SSSV OTIS LANDING NIP,1D=5.962" Datum MD= 9950' CONDUCTOR Datum TVD= 8800'SS — 13-3/8"CSG,72#,L-80 BTRS,ID-=12.347" H 2660' � 2601' —{9-5/8"DV PKR / 8371' —7"ARROW PAC LTPw/SEAL __-\ ,$-TING BR ASSY,E1 22.3_13"(10/24/12) s � 8384' —15.75"SCOOP GUI105-.1 Minimum ID = 2.313" a@ 8371' SZ 8384' —BTT GEN 2 DEPLOYMENT SLV 7" ARROW PAC LNR TOP PKR / w/GS PROFILE,D 3.70" r 8396' —13-1/2"PUP JOINT,ID=2.972" ' 8405" —13-1/2"OTIS X NIP.ID=2.812" 7"TBG,26#,L-80 AB-LI-4S,.0383 bpf,ID=6.276" — —8400' \ ' 1 8406' H7"PBRASSY,ID=? 8429' —19-5/8"X 7"GUIB PKR,D=3.833" S 8430' --17"X 4-1/2"XO,D=3.958" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,ID=3.958" H 8461' CHEM CUT TBG(05/03/02) 1 TOP OF 7"LNR —1 8487' — 1 8487' H 9-518"X 7"LTP w/LNR HGR,N3=? 8750' —ESTIMATED TOP OF CEMENT T { 9-5/8"CSG,47#,L-B0 BTRS,ID=8.681" —1 9007' I , 4 3-1/2"LNR 9.2#,L 80 STL,.0087 bpf,D=2.992" —{ 9283' ! 9283' - 3-1/2"X 3-3116"XO,ID=2.786" ( WHIPSTOCK(08/21/12) H 9310' *: t. 7"LNR,29#,L-80 BTRS,.0371 .p ,D NI =6.184" 9310' 3.80"MILLOUT WDOW(C-09B) 9310' -9321' PERFORATION SUMMARY REF LOG: ????? 10488' —13-3/16"X 2-7/8"XO,ID=2.377" ANGLEAT TOP PERF:88°@ 10280' Note:Refer to Roduction DB for historical pert date SIZE SPF INTERVAL Opn/Sqz DATE / 2" 6 11280-11480 0 08/14/12 2" 6 11500-11600 0 08/14/12 -----'3-1/4"LNR,6.6#,L-80 Tai,.0079 bpf,ID=2.850" —1 10488' I PBTD — 11618' 2-7/8"LNR,6.4#,L-80 STL,.0058 bpf,ID=2.441" —{ 11653' DATE REV BY COMNENTS DATE REV BY COMI ENTS FRUDHOE BAY UNIT 10/12/79 MISE INITIAL COMPLETION WELL: C-09B 05/14/02 N3S CTD SIDETRACK(C-08A) PERMIT Na: 2120600 08/16/12 NORDIC 1 CTD SIDETRACK(C-08B) AR No: 50-029-20366-02 08/17/12. PJC 'DRLG DRAFT CORRECTIOINS SEC 19,T11N,R14E,886'FNL&1223'FEL 11/12/12 i BSEJ PJC SET ARROW PAC LTP(10/24/12) BP Exploration(Alaska) - . l . - . Page 1 of Operation Summary -eport Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time.6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI. Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 7/28/2012 14:30 - 18:00 3.50 MOB P PRE MOVE TO C-PAD FROM PRICE PAD 18:00 - 20:00 2.00 MOB P PRE RIG ON SITE. POSITION RIG. CONDUCT CHANGEOUT AND HOLD PJSM FOR MOVING OVER WELL. SPOT RIG OVER WELL. RIG ACCEPTED FOR OPERATIONS AT 2000 HRS. 20:00 - 00:00 4.00 RIGU P PRE PICK UP REEL AND SECURE IN REEL HOUSE. -PRESSURE TEST AND CONDUCT FLOW TEST PER WELL PLAN TO REMOVE SWAB CAP. TEST OKAY, REMOVE CAP. BEGIN BOP NU. BEGIN RIGGING UP HARD LINE IN REEL. SPOT SATELLITE CAMP,WELDING SHACK, CUTTINGS BOX,INTEGRAL EQUIPMENT. 7/29/2012 00:00 - 06:00 6.00 RIGU P PRE NU BOP STACK. CONNECT CHOKE AND KILL LINES TO BOP STACK. COMPLETE INSTALLING HARD LINE IN REEL WHILE NU BOP. CONTINUE SPOTTING EQUIPMENT ON PAD. RU TIGER TANK AND HARD LINE, PRESSURE TEST. TAKE ON KCL. PREP REEL FOR GRAPPLE INSTALLATION TO PULL OVER. INSTALL LUBRICATOR EXTENSION TO BOP. 06:00 - 06:30 0.50 RIGU P PRE NOTIFY ALL PARTIES CONDUCTING SIMOPS ON PAD OF UPCOMING ALARM. CONDUCT RIG EVAC DRILL WITH CREW. CREW RESPONSE TIME 2 MIN 20 SEC. CONDUCT AAR. CONDUCT PRE-SPUD FOR WELL C-09B. 06:30 - 08:00 1.50 RIGU ` P PRE CREW CHANGE AND FINISH BOP NU 08:00 - 09:00 1.00 RIGU P PRE PU AND TIE OFF INJECTOR HOSES TO DERRICK 09:00 - 09:45 0.75 RIGU P PRE MU STUFFING BOX TO LUBRICATOR AND MU TO INJECTOR STRING OUT STABBING WINCH CABLE AND MU GRAPPLE PULL TEST GRAPPLE 09:45 - 10:00 0.25 RIGU P PRE PJSM TO STAB PIPE,MU QTS AND FLUID PACK REEL AND STACK FOR A COMPLETE TEST OF REEL IRON AND BOP STACK 10:00 - 11:30 1.50 RIGU P PRE PULL COIL TO INJECTOR 11:30 - 12:30 1.00 RIGU P PRE PIPE STABBED REMOVE GRAPPLE AND CABLE DRESS THE END OF THE COIL AND SEAL THE WIRE RU QTS 12:30 - 13:00 0.50 RIGU P PRE LINE UP KCL TO FILL COIL AND STACK 13:00 - 13:40 0.67 RIGU P PRE ONLINE FILLING COIL WITH KCL 13:02 SHUT DOWN TO TEST REEL IRON FOR LEAKS 13:08 NO LEAKS,CONTINUE LOADING COIL 13:40 - 14:10 0.50 RIGU P PRE KCL RETURNS AT THE SHACKER, LINER UP TO FLUID PACK ALL SURFACE LINES AND STACK FORA SHELL TEST 14:10 - 14:35 0.42 RIGU P PRE HOLDING LOW PT CHECKING ALL SURFACE LINES 14:35 - 14:45 0.17 RIGU P PRE GOOD SHELL AND REEL IRON TEST,CALL OUT STATE INSPECTOR TO WITNESS TEST Printed 11/5/2012 10:20:44AM • North America-ALASKA-BP Page 2 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:45 - 15:15 0.50 RIGU P PRE PERFORM RIG EVACUATION DRILL THE ALARM WAS SOUNDED AND EVERYONE MUSTERED WITHIN 3 MINUTES. NO DEFICIENCIES TO REPORT,GOOD DRILL. 15:15 - 15:45 0.50 BOPSUR P PRE STATE INSPECTOR ON LOCATION HOLD PJSM TO START TESTING BOP'S 15:45 - 00:00 8.25 BOPSUR P PRE TEST BOPE. FUNCTION TEST BOP FROM I:5RILLER'S CONSOLE. FLOOD MUD GAS SEPARATOR. CONDUCT DRAWDOWN TEST; v �C SYSTEM PRESSURE OF 2950 PSI,SHUT IN PRESSURE OF 2350 PSI,TIME TO 200 PSI 25 Xv SECONDS,TIME TO FULL SYSTEM RECOVERY 80 SECONDS. TEST ALL ALARMS. CONCURRENT OPS: INSTALL GUARDS OVER OA/IA VALVES AND OVER SSV VALVE. -TEST WITNESSED BY AOGCL_REP JOHN CRISP,TOOLPUSHER TYLER MCCONNELL 7/30/2012 00:00 - 06:00 6.00 BOPSUR P PRE BOP TEST. TROUBLE TESTING VALVES 2 AND 3. GREASE AND FUNCTION, RE-TEST OKAY. TROUBLE TESTING AGAINST VALVE #19. GREASE AND FUNCTION,STILL SEEING SLIGHT PRESSURE DROP. REMOVE AND RE-BUILD WHILE TESTING FLOOR SAFETY VALVES. RE-TEST VALVE#19,GOOD TEST. FUNCTION TEST BOP FROM COIL OPERATOR STATION. -TEST WITNESSED BY AOGCC REP JOHN CRISP,TOURPUSHER DAVE HILER 06:00 - 07:00 1.00 BOPSUR P PRE INNER REEL VALVE TESTED,RD INJECTOR AND TEST EQUIPMENT 07:00 - 08:30 1.50 FISH P DECOMP MU BTT CTC, PULL AND PRESSURE TEST HOLD PJSM TO PULL TEST INJECTOR FOR ANNUAL TEST AND CALIBRATION 08:30 - 10:30 2.00 FISH P DECOMP RU PULL PLATE TO CTC 10:30 - 11:00 0.50 FISH P DECOMP INJECTOR HEAD LOAD CELL CALIBRATED PJSM TO LOAD BTT TOOLS ON THE RIG 11:00 - 11:40 0.67 FISH P DECOMP PREP TO TEST NIGHT CAP TO OPEN UP TO THE WELL OPEN IA&OA VALVES TO SENSORS AND PUMP SSV OPEN SSV WON'T OPEN,PT NIGHT CAP THEN OPEN VALVES TO WELL AND SEE IF ITS JUST PRESSURE LOCKED FROM TESTING BOP'S CALL GREASE CREW TO START HEADING THIS WAY JUST INCASE 11:40 - 12:10 0.50 FISH P DECOMP GOOD TEST ON NIGHT CAP, BLEED OFF AND MONITOR OPEN SWAB AND ITS PRESSURE LOCKED 12:10 - 12:20 0.17 FISH P DECOMP PRESSURE UP TO 2500PSI TO SEE IF WE CAN EQUALIZE THE VALVE 12:20 - 12:30 0.17 FISH P DECOMP SWAB IS OPEN,SSV IS OPEN,OPEN MASTER AND MONITOR FOR PRESSURE 12:30 - 12:35 0.08 FISH P DECOMP NO PRESSURE, LINE UP TO PUMP METHANOL ACROSS THE TOP TO ENSURE THE HOLE IS FULL Printed 11/5/2012 10:20:44AM • North America-ALASKA-BP • Page 3 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62 50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:35 - 12.45 0.17 FISH P DECOMP WELL TOOK 1.4 BBLS AND PRESSURE UP TO 100PSI,SHUT DOWN PUMP AND BLEED OFF PRESSURE. PUMP ACROSS THE TOP TO ENSURE THE HOLE IS FULL THEN SUT DOWN TO FLOW CHECK WELL 12:45 - 12:55 0.17 FISH P DECOMP HOLE IS FULL PUMPED 3.5 BBLS AND LOST —0.2 BBLS "SHUT DOWN PUMP AND MONITOR WELL FOR 15 MIN AS PER WELL PLAN 12:55 - 13:10 0.25 FISH P DECOMP HOLD PJSM TO PU FISHING BHA 13:10 - 13:20 0.17 FISH P DECOMP CHECK TO MAKE SURE HOLE IS FULL AND IT IS. REMOVE NIGHT CAP AND CHECK FLUID LEVEL 13:20 - 14:00 0.67 FISH P DECOMP WELLBORE IS FULL,WE HAVE FLUID IN THE STACK,MU FISHING BHA 14:00 - 14:20 0.33 FISH P DECOMP MU FISHING BHA 14:20 - 15:10 0.83 FISH P DECOMP RIH TO 2800'AND CIRC OUT FP 15:10 - 15:30 0.33 FISH P DECOMP CIRCULATE FP OUT 15:30 - 16:35 1.08 FISH P DECOMP_.GOOD KCL AT SURFACE, LINE UP TO THE WIGS TO TAKE RETURNS BACK TO THE PITS 16:35 - 17:05 0.50 FISH P DECOMP -STOP FOR CTS MECH TO ADJUST COUNTER-BALANCE VALVES ON INJECTOR CBV ADJUSTED CONTINUE RIH 17:05 - 17:10 0.08 • FISH P DECOMP WEIGHT CHECKS BEFORE LATCHING ONTO FISH PU WT=33K ELEC 34K ON MECH,RIH WT= 19K ELEC 20K MECH 17:10 - 21:45 4.58 FISH P PRODOP TAG FISH,STACK 5K DOWN AND PU. UP WT =39K ELEC 40K MECH PU 20'AND CIRC 1.5 VOLUMES AS PER WELL PLAN. CONDUCT FLOW CHECK AFTER CIRCULATING 460 BBLS. NO FLOW. 21:45 - 00:00 2.25 FISH P PRODOP POH WITH FISH. 7/31/2012 00:00 - 00:30 0.50 FISH P DECOMP POH WITH FISH(3-1/4"LINER ASSEMBLY)TO 300', FLOW CHECK WELL. NO ISSUES. PJSM ON POPPING OFF AND LAYING DOWN LINER. 00:30 - 04:30 4.00 FISH P DECOMP PULL FISH TO SURFACE. LD BHA. SECURE AND BREAK OUT 3"FISHING SPEAR ASSEMBLY WITH SEAL ASSEMBLY AND DEPLOYMENT SLEEVE. LAY DOWN SEAL ASSEMBLY, DEPLOYMENT SLEEVE,PUP JOINT,AND XN NIPPLE. CEMENT SHEATH ALL THE WAY TO THE DEPLOYMENT SLEEVE. LD 3-1/2"JOINT. CHANGE OUT DIES. LAY DOWN 1 JOINT OF LINER AND HAVE AAR TO DETERMINE IF EVERYONE AGREES THAT THE JOB IS BEING CONDUCTED PROPERLY. DECIDE TO MOVE PLACEMENT OF FARR TONGS. CONTINUE TO LAY DOWN TOTAL OF 30 JOINTS OF 3-1/4"LINER(3-3/16" CONNECTIONS). LD CUT JOINT, LENGTH 6.96'. 04:30 - 05:00 0.50 FISH P DECOMP CLEAR AND CLEAN RIG FLOOR OF EQUIPMENT AND CEMENT SCALE. RD ELEVATORS. RU INJECTOR TO PREPARE FOR UNDER REAMING BHA. Printed 11/5/2012 10:20:44AM ... ,.: :ImmstworNorth America -ALASKA- BP Page 4 of 22 O••eration Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168 00) 1 Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12.00.00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 06:00 1.00 FISH P DECOMP MU UNDER REAMER BHA:3.80"PARABOLIC MILL,DB UNDER REAMER,2-7/8"STRAIGHT MOTOR,CIRC SUB/DISCONNECT,JARS, DUAL BPV,XO,2 JTS 2-3/8"PH6,XO, LOCKABLE SWIVEL,XO,COIL TUBING CONNECTOR. MU INJECTOR, PRESSURE TEST QUICK TEST SUB. 06:00 - 08:00 2.00 FISH P DECOMP RIH WITH UNDER REAMER BHA MONITORING RETURNS. 08:00 - 09:00 1.00 FISH P DECOMP STOP RIH WAITING FOR MUD 09:00 - 09:40 0.67 FISH P DECOMP PUMP CLEAN KCL SPACER FOR MUD SWAP 09:40 - 11:00 1.33 FISH P DECOMP PUMP A 35 BBL HI-VIS PILL FOR A CLEAN TRANSITION BETWEEN KCL AND NEW MUD 11:00 - 12:00 1.00 FISH P DECOMP ALL MUD ON LOCATION AND READY TO GO DOWN HOLE.CIRC 25 BBLS TO GET HI-VIS PILL TO THE MILL THEN RIH TO 8500'TO START UNDER REAMING 12:00 - 18:00 6.00 FISH P DECOMP UNDERREAM AT 30-FPH,CIRCULATING AT 2.68-BPM/2480-PSI FROM 8500' 18:00 - 00:00 6.00 FISH -P DECOMP CONDUCT CREW CHANGEOUT. CONTINUE WITH UNDER REAMING PER WELL PLAN AT 30 FPH. NO LARGE DEBRIS COMING ACROSS SHAKERS. 8/1/2012 00:00 - 06:00 6.00 CLEAN P DECOMP WORK UNDER REAMER FROM 8800'TO 9060' AT 2.65 BPM,2480 PSI. NO MOTOR WORK SEEN TO THIS DEPTH. 06:00 - 14:30 8.50 CLEAN P DECOMP CONTINUE TO UNDER-REAM FROM 9060'AT 2.68-BPM/2490-PSI. SEE MOTORWORK BEGINNING AT 9080'WITH INCREASE IN PRESSURE TO 2530-PSI. AFTER BOTTOMS UP SEE SLIGHT INCREASE IN CUTTINGS ACROSS SHAKERS-DARKER COLORED AND VERY FINE(SANDY) PARTICLE RETURNS. BLEED IA FROM 450-PSI TO 20-PSI-MOSTLY FLUID BLEED OA FROM 480-PSI TO 50-PSI- MOSTLY FLUID. CHANGE OUT SENSOR ON IA BECAUSE SENSOR READING WAS LOWER THAN GAUGE READING. MOTOR WORK INCREASES TO 100-PSI PAST 9200'. PUMP 20-BBL HI VIS SWEEP AT 9270'. MINIMAL INCREASE IN FINE CUTTINGS WITH SWEEP BACK. CONTINUE TO UNDERREAM AHEAD TO TAG STUMP AT 9355.5'(UNCORRECTED). 14:30 - 15:30 1.00 CLEAN P DECOMP PU&REPEAT TAG WITH 1.5K-LBS DOWN AT 9355.5'. PU AND BACK REAM FROM STUMP TO 9300' AT 3.5-FPM. UNDERREAM FROM 9300'TO STUMP AT 3.5-FPM. REPEAT UP PASS-VERY CLEAN WITH LITTLE PRESSURE FLUCTUATION. IA/OA=160-PSI/180-PSI. Printed 11/5/2012 10:20:44AM • North America -ALASKA- BP ! Page 5 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:30 1.00 CLEAN P DECOMP POSITION BALL DROP. BEGIN PUMPING 40-BBLS HI VIS SWEEP. DROP 5/8"BALL CHASING WITH REST OF SWEEP AT 2.7-BPM /2300-PSI. DROP RATE TO.6-BPM/1400-PSI WITH 36-BBLS PUMPED. RECIPROCATE PIPE SLOWLY WHILE PUMPING BALL DOWN&POSITION NEAR STUMP WHEN SWEEP TURNS CORNER. SEE SHEAR WITH 48-BBLS PUMPED AND 3800-PSI. FINISH PUMPING SWEEP INTO ANNULUS. 16:30 - 20:00 3.50 CLEAN P DECOMP FLOW CHECK WELL-NO FLOW. POH,CHASING SWEEP AT 3.7-BPM/2850-PSI. NO INCREASE IN CUTTINGS NOTED WITH SWEEP BACK. FLOW CHECK WITH BHA AT 350'BELOW BOP. PJSM ON LAYING DOWN BHA. FLOW CHECK GOOD. 20:00 - 20:30 0.50 CLEAN P DECOMP ;PULL BHA TO SURFACE. POP OFF,LAY DOWN BHA. 5/8"BALL RETRIEVED. MILL IN GAUGE AT 3.80'GO,3.79"NO-GO. CUTTERS ON UNDER REAMER NOT DAMAGED OR SHOWING SIGNIFICANT WEAR. 20:30 - 21:00 0.50 EVAL P DECOMP CONDUCT FLOW CHECK ON TWO MECHANICAL BARRIERS(VALVES)IN ORDER TO PREPARE FOR COIL MANAGEMENT OPERATIONS. GOOD FLOW CHECK. 21:00 - 00:00 3.00 RIGU P DECOMP STAB ON WITH INJECTOR. REVERSE CIRCULATE WITH FRESH WATER TO PUMP E-LINE BACK FOR SLACK MANAGEMENT. CUT 300'OF COIL. CUT AND CLEAN COIL FOR INSTALLING COIL CONNECTOR. INSTALL CONNECTOR. PRESSURE TEST AND PULL TEST CONNECTOR. BOTH GOOD. STAB BACK ON AND PUMP SLACK FORWARD. 8/2/2012 00:00 - 02:15 2.25 RIGU P DECOMP PREP E-LINE. HEAD UP WITH BAKER INTEQ UPPER QUICK CONNECT. TEST CONDUCTIVITY. MU LOWER QUICK CONNECT. STAB ON, PRESSURE TEST QUICK TEST SUB AND DUAL FLAPPER CHECK VALVES. GOOD TEST. BLEED PRESSURE OFF. 02:15 - 03:15 1.00 EVAL P DECOMP MONITOR WELL WHILE CONDUCTING PJSM ON MAKING UP DUMMY WHIPSTOCK BHA. OPEN WELL TO CLOSED CHOKE. NO PRESSURE. OPEN CHOKE, NO FLOW. POP OFF, FLUID COLUMN STATIC. MAKE UP BHA: GAUGE RING CARRIER,WEIGHT PIPE, GAUGE RING CARRIER,XO, BLIND SUB, DGS, DPS, EDC, P&C,WEAR SUB, LQC, UQC,XO, CTC. PRESSURE TEST QUICK TEST SUB. CIRCULATE AT SURFACE TO CLEAR COIL OF FRESH WATER. Printed 11/5/2012 10:20:44AM North America -ALASKA-BP • Page 6 of 22 O•eration Summary Report Common Well Name:C-09 AFE No • Event Type:RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:15 - 05:00 1.75 EVAL P DECOMP RIH WITH WHIPSTOCK DRIFT ASSEMBLY_ CONDUCT KICK WHILE TRIPPING DRILL WITH CREW. SIMULATE PIT GAIN, RESPONSE TIME OF<1 MIN. SHUT DOWN PER STANDING ORDERS,CHECK FOR FLOW, INDICATE NO FLOW, RESUME OPERATIONS. CONTINUE TO RIH TO 9100'. 05:00 - 07:00 2.00 EVAL P DECOMP LOG TIE-IN TO PDC LOG FROM 9100'TO 9290'. APPLY-2'CORRECTION IA/OA/PVT=70-PSI/10-PSI/320-BBLS. 07:00 - 07:20 0.33 EVAL P DECOMP RIH TO TAG LINER AT 9354.7'CORRECTED DEPTH. POH TO 8300'. 07:20 - 08:30 1.17 EVAL P DECOMP lOG CCL DOWN FROM 8300'AT 1200-FPH TO JUST ABOVE LINER STUMP FOR DELINIATING LINER TOP PLACEMENT AND WHIPSTOCK SETTING DEPTH- AVG JT LENGTH=39.5' AND SEE LOWERMOST COLLAR AT 9293'. THIS INDICATES COLLAR AT 9332.5'WHICH IS ACROSS WHIPSTOCK TRAY AT PLANNED SET DEPTH OF 9325'. _CIRCULATE AT 9-BPM/1160-PSI. LIGHTLY TAG LINER STUMP AT 9355' FLOW _ CHECK WELL-NO FLOW. 08:30 - 10:00 1.50 EVAL P DECOMP POH WITH WHIPSTOCK DRIFT CIRCULATING AT 1-BPM/1130-PSI. DISCUSS WHIPSTOCK SETTING DEPTH WITH ODE, DD, BTT REP&GEO. PLAN TO SET TOP OF WHIPSTOCK AT 9310'. BHI DEVELOP NEW DIRECTIONAL PLAN AND ODE COMPLETE MOC. IA/OA=90-PSI/10-PSI. 10:00 - 10:30 0.50 EVAL P DECOMP FLOW CHECK WELL AT 200'-NO FLOW. HOLD PJSM ON LD DUMMY WHIPSTOCK&MU WHIPSTOCK. DISCUSS POSITIONS OF PEOPLE,EQUIPMENT HANDLING AND BHA COMPONENTS. HIGHLIGHT NEW RATED LIFTING EYE FOR HANDLING WHIPSTOCK- GREAT IMPROVEMENT FROM BTT. IA/OA/PVT=80-PSI/10-PSI/273-BBLS. 10:30 - 11:00 0.50 EVAL P DECOMP UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE. BLOW DOWN BHI TOOLSTRING&LD TO PIPE SHED. LD DUMMY WHIPSTOCK DRIFT. 11:00 - 11:30 0.50 STWHIP P WEXIT PU WHIPSTOCK&MU RUNNING TOOL. MU TO BHI COILTRAK BHA. BHA CONSISTS OF-7"GEN 2 WHIPSTOCK, ADAPTER KIT,J HYDRAULIC SETTING TOOL, XO,XO,HOT, DGS, DPS, EDC, P&C,WEAR SUB, LQC, UQC,XO,CTC. OAL=80.80' 11:30 - 12:00 0.50 STWHIP P WEXIT MU COIL TO STRING&STAB INJECTOR ON WELL. TEST QTS TO 250-PSI/3500-PSI FOR 5-MIN PER TEST. GOOD TESTS. OPEN EDC. 12:00 - 13:45 1.75 STWHIP P WEXIT RIH WITH WHIPSTOCK,CIRCULATING THROUGH OPEN EDC AT.4-BPM/900-PSI. IA/OA=60-PSI/10-PSI. Printed 11/5/2012 10:20:44AM North America-ALASKA- BP Page 7 of 22 Operation Summary Report Common Well Name: C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:45 - 14:15 0.50 STWHIP P WEXIT LOG TIE IN TO PDC LOG. APPLY-2'CORRECTION. NEW DIRECTIONAL PLAN RECEIVED FROM BHI WELL PLANNER. IA/OA=70-PSI/10-PSI. 14:15 - 15:15 1.00 STWHIP P WEXIT OBTAIN PU WEIGHT AT 9280'=37K-LBS. x �0 ORIENT TO WHIPSTOCK TO 30L(330-DEG lJ TF). RIH TO 9327.5'(TOP OF WHIPSTOCK AT -9310') REVIEW DIRECTIONAL PLAN TO ENSURE OBJECTIVES MET-NO ISSUES. 15:15 - 15:30 0.25 STWHIP P WEXIT RECEIVE AGREEMENT FROM ODE TO SET WHIPSTOCK PER PLAN#2. CLOSE EDC.PRESSURE UP TO 3790-PSI& SEE WHIPSTOCK SHEAR SET. SET DOWN 2K-LBS TO CONFIRM SET. FLOW CHECK WELL-NO FLOW. 15:30 - 17:15 1.75 STWHIP P WEXIT POH WITH WHIPSTOCK RUNNING TOOLS. STOP AT 300'AND FLOW CHECK WELL-NO FLOW. 17:15 - 17:30 0.25 STWHIP P WEXIT HOLD PJSM ON LD WHIPSTOCK RUNNING TOOLS. DISCUSS INJECTOR HANDLING, IMPORTANCE OF COMMUNICATION, OFFLOADING UN-NECESSARY TOOLS. 17:30 - 19:00 1.50 STWHIP P WEXIT UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE. BLOW DOWN BHI TOOLSTRING&LD WHIPSTOCK RUNNING BHA. CONDUCT CREW CHANGE OUT. OFFLOAD TOOLS FROM RIG FLOOR. PJSM ON MAKING UP MILLING BHA. 19:00 20:00 1.00 STWHIP PWEXIT MU MILLING BHA:3.80"WINDOW MILL,3.78" �v STRING MILL,2-7/8"MOTOR,XO,2 JTS PH6, XO,BLIND SUB, DGS,DPS,EDC,P&C,WEAR ` SUB, LQC, UQC,XO,CTC. GAUGE MILLS: WINDOW MILL 3.80"GO,3.79"NO-GO;STRING MILL 3.80"GO,3.79"NO-GO. CONDUCT KICK WHILE MAKING UP MWD TOOLS WITH NEW FLOORHAND WORKING BHA. REACTED PER STANDING ORDERS. CONDUCTED WALK THROUGH AFTER DRILL TO EMPHASIZE CERTAIN ASPECTS OF MAKING UP SAFETY JOINT AND REINFORCING THE TIMING OF THE CLOSURE OF THE SAFETY VALVE. COMPLETE MAKING UP BHA,STAB ON WITH INJECTOR. PRESSURE TEST QUICK TEST SUB. 20:00 - 22:30 2.50 STWHIP P WEXIT RIH WITH WINDOW MILLING ASSEMBLY. LOG TIE-IN WITH-2'CORRECTION. CONTINUE TO RIH. OBTAIN SLOW PUMP RATES ABOVE WHIPSTOCK. DOWN ON PUMPS AND CONTINUE TO RIH TO DRY TAG WHIPSTOCK. TAG AT 9318'COIL TUBING DEPTH. PICK UP, PUW 36K. RUN BACK DOWN AND DRY TAG AGAIN AT 9316'. PICK UP,PUW 37K. COME ON WITH PUMPS TO 2.65 BPM,2440 PSI,AND RUN BACK DOWN. TAG AT 9316'. BEGIN TIME MILLING. Printed 11/5/2012 10:20:44AM North America -ALASKA- BP i Page 8 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:45 1.25 STWHIP P WEXIT TIME MILL WINDOW FOR FIRST FOOT AT 2.66 BPM,2425 PSI. WOB NEGLIGIBLE. 23:45 - 00:00 0.25 STWHIP P WEXIT BEGIN TO INCREASE WOB AND PRESSURE. 2.65 BPM,2.5-3 K WOB,2600-2700 PSI. 8/3/2012 00:00 - 02:30 I 2.50 STWHIP P WEXIT MILL WINDOW AT 2.68 BPM,2700-2800 PSI, 3.0-4.2K WOB MW IN AND OUT 8 5 PPG _ INCREASE WOB TO CONTINUE MILLING AT 3.4-3.7K WOB,SEEMED TO HAVE THE BEST ROP BUT HAD SIGNIFICANT AMOUNT OF IMPACT OF VIBRATION UPON THE SURVEYS. CONTINUE MILLING WITH DIFFERENTIATING WEIGHT ON BIT 1 9-2.6K WOB RESULTED IN 1.9 FPH ROP AND MINIMIZED VIBRATION IMPACT UPON TOOLS. 02:30 - 03:30 1.00 STWHIP P WEXIT BEGIN TIME MILLING LAST FOOT OF WINDOW AT 2.67-2.70 BPM,2480-2670 PSI, .1-.72K WOB. ESTIMATED WINDOW MILL EXIT AT 9324.0'. CONTINUE WITH TIME MILLING WITH STRING MILL IN WINDOW. ESTIMATE STRING MILL OUT OF WINDOW AND DRILLING INTO NEW OPEN FORMATION AT 9325'. 03:30 - 08:00 4.50 STWHIP P WEXIT DRILL INTO NEW OPEN HOLE WITH MILLING ASSEMBLY TO 9335'. RESET COUNTER FOR BOTTOMS UP SAMPLE. DRIFT THROUGH WINDOW THREE TIMES, PUMP HI-VIS PILL WHILE DRIFTING. GEO CONFIRMS 90%FORMATION SAND IN SAMPLE. SHUT DOWN PUMP AND DRY DRIFT WINDOW -NO ISSUES. FLOW CHECK WELL-NO FLOW. IA/OA/PVT=190-PSI/50-PSI/309-BBLS. 08:00 - 10:30 2.50 STWHIP P WEXIT FLOW CHECK WELL-NO FLOW. OPEN EDC. POH WITH WINDOW MILLING BHA, CIRCULATING AT 3.8-BPM/2950-PSI,TO 300' NO NOTABLE CHANGE IN CUTTINGS WITH SWEEP. 10:30 - 11:00 0.50 STWHIP P WEXIT AT 300',FLOW CHECK WELL-NO FLOW. CLOSE EDC. HOLD PJSM ON LD BHA. DISCUSS ORDER OF OPERATIONS,BEAVERSLIDE USAGE,WELL CONTROL CONSIDERATIONS AND IMPORTANCE OF COMMUNICATION. IA/OA/PVT=180-PSI/150-PSI/268-BBLS. 11:00 - 11:30 0.50 STWHIP P WEXIT UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE. BLOW DOWN BHI TOOLSTRING. LD WINDOW MILLING BHA. INSPECT&GAUGE MILLS-NORMAL WEAR PATTERS&WINDOW MILL=3.8"GO/3.79" NO GO. STRING MILL=3.79"GO/3.78"NO GO 11:30 - 12:00 0.50 DRILL P PROD1 MU BUILD/LATERAL DRILLING BHA. BHA CONSISTS OF 3-3/4"X 4-1/4"HYC HELIOS BICENTER,1.3-DEG 3-1/8"ULS MOTOR,HOT, USMPR,DGS,DPS,EDC,P&C,WEAR SUB, LQC, UQC,XO,CTC. OAL=85.85' PU INJECTOR,MU COIL TO BHA AND STAB ON WELL. Printed 11/5/2012 10:20:44AM - .. . . North America-ALASKA- BP • Page 9 of 22 0•eration Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 'X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM 1Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA I UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 12:45 0.75 DRILL P PROD1 PRESSURE TEST QTS TO 250-PSI/3500-PSI FOR 5-MIN PER TEST. GOOD TESTS. WHILE TESTING,CLEAN POSSUM BELLY& CHANGE OUT SHAKER SCREENS. IA/OA/PVT= 123-PSI/120-PSI/267-BBLS. 12:45 - 14:30 1.75 DRILL P PROD1 RIH WITH BUILD/LATERAL DRILLING BHA TO 9280' CIRCULATE AT.2-BPM/1050-PSI. 14:30 - 14:50 0.33 DRILL P PROD1 LOG TIE IN TO PDC LOG. APPLY-3'CORRECTION. IA/OA= 112-PSI/35-PSI. 14:50 - 15:15 0.42 DRILL P PROD1 RECIPROCATE COIL SLOWLY AND OBTAIN SPRS. CONTINUE TO RIH PUMPING AT MIN RATE THROUGH WINDOW-NO ISSUES. TAG BOTTOM AT 9335'. 15:15 - 18:30 3.25 DRILL P PROD1 DRILL AHEAD FROM 9335 TO 9450' FREE SPIN AT 2.8-BPM/3250-PSI. DRILL WITH 1-3K-LBS DHWOB AND 150- 350-PSI MOTOR WORK. ROP STEADY BETWEEN 30 AND 50-FPH. AT START,IA/OA/PVT/ECD= 120-PSI/ 30-PSI/291-BBLS/9.1-PPG. 18:30 - 18:45 0.25 DRILL P PROD1 FINISH CREW CHANGE AND OBTAIN SLOW PUMP RATES. 18:45 - 20:00 1.25 DRILL P PROD1 DRILL AHEAD FROM 9450'TO 9510' FREE SPIN AT 2.8-BPM/2710-PSI. INCREASE RATE TO 3-BPM/2950-PSI. AT START,IA/OA/PVT/ECD=276-PSI/ 160-PSI/291-BBLS/9.2-PPG. 20:00 - 20:30 0.50 DRILL P PROD1 WIPER TRIP TO WINDOW. 20:30 - 23:00 2.50 DRILL N PROD1 PULL INTO WINDOW AND CIRCULATE WHILE RECIPROCATING TO TROUBLESHOOT MOTOR OPERATION ON SHAKER. REPLACE BROKEN WIRE GOING TO MOTOR. REPLACE, CHECK OPERATION. GOOD. 23:00 - 23:30 0.50 DRILL P PROD1 RUN BACK IN HOLE TO COMPLETE WIPER TRIP. LOG FROM 9300'TO 9335'TO CAPTURE GAP IN ORIGINAL TIE-IN LOG. CONTINUE TO RIH. 23:30 - 00:00 0.50 DRILL P PROD1 ON BOTTOM WITH NO ISSUES. FREE SPIN 2950 PSI AT 3.0 BPM. DRILL AHEAD FROM 9510'TO 9525'. DRILL AHEAD AT 3.0 BPM,3275 PSI,1.9-2.35K WOB,9.20 PPG ECD,MW IN AND OUT 8.50 PPG LOSSES TO FORMATION AT 4 BPH 8/4/2012 00:00 - 03:30 3.50 DRILL P PROD1 ON BOTTOM WITH NO ISSUES. FREE SPIN 2875 PSI AT 3.0 BPM. DRILL AHEAD FROM 9525'TO 9800'. DRILL AHEAD AT 3.0 BPM,3210-3430 PSI, 1.9-2.32K WOB,9.22 PPG ECD,MW IN AND OUT 8.50 PPG LOSSES AVERAGING 3-1/2 BPH. -DROPPED TOOLBOX CONTAINING WWT AST TOOLS OFF OF PIPE ELEVATOR. RESPECTIVE PERSONNEL NOTIFIED, INVESTIGATION UNDER WAY. 03:30 - 04:15 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW WITH 1 BBL LOSSES ON TRIP INTO WINDOW Printed 11/5/2012 10:20:44AM • North America -ALASKA- BP • Page 10 oto row Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date. 8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time.6/25/1979 12.00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:15 - 05:15 1.00 DRILL P PROD1 PULL THROUGH WINDOW. OPEN EDC AND RUN BACK DOWN PAST WINDOW. PICK UP AND JET WHIPSTOCK TRAY WITH THREE PASSES. CIRCULATE BOTTOMS UP AT MAX RATE WHILE SLOWLY PULLING UP HOLE TO CLEAN 7"LINER AND 9-5/8"CASING. CLOSE EDC. LOG TIE-IN WITH+2'CORRECTION. 05:15 - 06:00 0.75 DRILL P PROD1 'Rlli WITH DRILLING ASSEMBLY TO 9800'. 4 BBLS LOST ON WIPER TRIP AND BOTTOMS UP CIRCULATION. 06:00 - 09:00 3.00 DRILL P PROD1 ON BOTTOM WITH NO ISSUES. FREE SPIN 3020 PSI AT 3.0 BPM. DRILL AHEAD FROM 9800'TO 9950'. DRILL AHEAD AT 3.0 BPM,200-500 PSI MW, 1.5.4K-LB DHWOB,9.22 PPG ECD,MW IN AND OUT 8.50 PPG. 09:00 - 09:45 0.75 DRILL P PROD1 WIPER TRIP FROM 9950'TO WINDOW. NO ISSUES NOTED ON TRIP TO OR FROM WINDOW. ODE APPROVES INCREASING MAX OA PRESSURE TO 800-PSI. IA/OA=320-PSI/480-PSI. 09:45 - 11:15 1.50 DRILL N WAIT PROD1 CTS HAS NELSON ENGINEERING INSPECT INJECTOR TO INVESIGATE HOW TO LIMIT SIDE-LOADING OF INJECTOR DURING PULL BACK OPERATIONS. 11:15 - 13:15 2.00 DRILL P PROD1 DRILL AHEAD FROM 9950'TO 10,050'. FREE SPIN AT 3.01-BPM/3000-PSI. DRILL AHEAD WITH 200-500-PSI MOTOR _ . WORK AND 2-5K-LBS DHWOB. INCREASE SAMPLE FREQUENCY TO EVERY 10'DRILLED PER GEO REQUEST. AT START,IA/OA/PVT/ECD=325-PSI/ 535-PSI/259-BBLS/9.23-PPG. MW IN- 8.53-PPG/MW OUT-8.51-PPG. AT END,IA/OA/PVT/ECD=395-PSI/ 570-PSI/256-BBLS/9.29-PPG. MW IN- 8.56-PPG/MW OUT-8.54-PPG. 13:15 - 14:55 1.67 DRILL P PROD1 MAKE WIPER TRIP FROM 10,050'TO WINDOW CIRCULATING AT 3.4-BPM/3660-PSI. NO ISSUES NOTED ON TRIP. COLLECT ALL 10'FORMATION SAMPLES, GEO LOOKING FOR MHO CONTACT. 14:55 - 15.15 0.33 DRILL P PROD1 DRILL AHEAD FROM 10,050'TO 10,100'WITH VERY HIGH ROP. FREE SPIN=3-BPM/3050-PSI REDUCE CIRCULATION RATE TO 2.6-BPM AND 3700-PSI WITH 4-4 5K-LBS DHWOB TO ENABLE DRILLING AHEAD TO BUILD ANGLE SLIGHTLY. Printed 11/5/2012 10:20.44AM North America-ALASKA- BP Page 11 o Operation Summary Report 4 Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:15 - 17:00 1.75 DRILL P PROD1 WIPER WHILE CIRCULATING SAMPLES UP FOR GEO FROM 10,060'THROUGH 10,100'- LOOKING FOR MHO. CIRCULATE AT 3.5-BPM/3780-PSI. BLEED IA FROM 500-PSI TO 200-PSI-ALL GAS. BLEED OA FROM 700-PSI TO 420-PSI- ALL LIQUID. CONTINUE TO CIRCULATE WHILE WAITING FOR GEOLOGIST TO ANALYZE SAMPLES. GEO DOES NOT SEE MHO. DIRECTES DD TO AIM FOR 8980'TVD SS AND CONTINUE WITH 10'SAMPLES. 17:00 - 20:30 3.50 DRILL P PROD1 DRILL AHEAD FROM 10,100'. FREE SPIN=2.98-BPM/3000-PSI. AT START,IA/OA/PVT/ECD=260-PSI/ 480-PSI/248-BBLS/9.28-PPPG. MW IN= 8.56-PPG/MW OUT=8.52-PPG. 20:30 - 21:30 1.00 DRILL P PROD1 WIPER TRIP TO CIRCULATE SAMPLES FOR GEO. ONE OVERPULL OF 12K ON TRIP UP. WIPE THROUGH WITH NO ISSUES. CONTINUE TO WINDOW WHILE SAMPLES ARE CIRCULATED UP. TIE-IN WITH+4' CORRECTION. RUN BACK DOWN. 5 BBL LOSS DURING WIPER TRIP. 21:30 - 22:00 0.50 DRILL P PROD1 DRILL AHEAD FROM 10,210'. FREE SPIN 3120 PSI AT 2.9 BPM. 2.95 BPM,3160 PSI,3.6K WOB,9.31 PPG ECD GEOLOGIST CONFIRMS MHO/HOT AT 10,160' MD,8978'TVD 22:00 - 22:30 0.50 DRILL P PROD1 BHA WIPER WITH A COUPLE OF MINOR OVERPULLS. RUN BACK DOWN WITH NO ISSUES. 22:30 - 23:45 1.25 DRILL P PROD1 ON BOTTOM, FREE SPIN 3070 PSI AT 2.95 BPM. DRILL AHEAD DIRECTIONALLY FROM 10,250'TO 10,350' 3.0 BPM,3160-3435 PSI,9.31 PPG ECD, 2.6-4.6K WOB,MW IN AND OUT 8.56 PPG 1 BPH LOSSES TO FORMATION 23:45 - 00:00 0.25 DRILL P PROD1 WIPER TO WINDOW. NO OVERPULLS ON TRIP UP. 8/5/2012 00:00 - 01:15 1.25 DRILL P PROD1 NO ISSUES ON TRIP UP TO WINDOW. RUN BACK DOWN FROM WINDOW. NO SETDOWNS. LOST 3 BBLS DURING TRIP. 01:15 - 03:45 2.50 DRILL P PROD1 DRILL AHEAD FROM 1.0,350'. FREE SPIN 3190 PSI AT 3.0 BPM. 2.95-3.01 BPM,3430-3570 PSI,1.5-4.7K WOB, 9.32PPG ECD,MW IN 8.59 PPG,MW OUT 8.61 PPG DRILLED INTO SEVERAL SHALE STRINGERS, BROKE THROUGH WITH LITTLE IMPACT. BROKE THROUGH,WIPER TRIP TO CLEAN UP. ENCOUNTER SOME PACKOFF AROUND BHA ON WIPER. CLEAN UP HOLE UNTIL PRESSURES BACK TO PAST DRILLING RATES. RUN BACK DOWN AND CONTINUE TO DRILL AHEAD. AVERAGE LOSSES THIS SECTION 2.5 BPH Printed 11/5/2012 10:20:44AM North America-ALASKA- BP Page 12 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:45 - 06:00 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW. PULL INTO WINDOW AND CIRCULATE UNTIL SAMPLES ARE OUT OF HOLE. RUN BACK IN HOLE WITH NEW MUD GOING DOWN COIL. TAG AT 9916`MWD LOG SHOWS SHALE STRINGER AT 9910'TO 9930'. PICK UP, RE-ORIENT BIT AND CLEAN UP SECTION. PASS THROUGH WITH NO ISSUES. CONTINUE RUNNING TO TD. FLOW CHECK ON BOTTOM,NO FLOW. 06:00 - 09:15 3.25 DRILL P PROD1 POH LAYING IN FRESH MUD PILL FOR OPEN HOLE LOGGING. PULL INTO WINDOW AND OPEN EDC. FLOW CHECK AT WINDOW,NO FLOW. BRING ON PUMPS TO MAX RATE. JET WHIPSTOCK TRAY. POH WITH BUILD DRILLING BHA TO 350'. CHECK TREE BOLTS WHILE POH-ALL BOLTS TIGHT. PDS REP ON LOCATION. 09:15 - 09:45 0.50 DRILL P PROD1 FLOW CHECK WELL AT 350'-NO FLOW. CLOSE EDO. HOLD PJSM ON LD DRILLING BHA. DISCUSS POSITIONS OF PEOPLE,ORDER OF OPERATIONS,WELL CONTROL CONSIDERATIONS AND DISTRACTIONS FROM THE TASK AT HAND. IA/OA=110-PSI/550-PSI. 09:45 - 10:15 0.50 DRILL P PROD1 UNSTAB INJECTOR&SET BACK OVER CIRC HOLE. BLOW DOWN&LD DRILLING BHA. NOSE SEVERELY WRUNG OUT. GRADE BIT: 4-2-RO-N-X-I-BU-BHA 10:15 - 10:45 0.50 EVAL P PROD1 CLEAR&CLEAN RIG FLOOR. BHI RECONFIGURE TOOLS FOR OH CALIPER LOGGING BHA. IA/OA/PVT= 110-PSI/515-PSI/275-BBLS. 10:45 - 12:00 1.25 EVAL P PROD1 HOLD PJSM ON MU CALIPER LOGGING BHA. DISCUSS POSITIONS OF PEOPLE, HANDLING OF CALIPER TOOLS AND WELL CONTROL CONSIDERATIONS. MU CALIPER LOGGING BHA. BHA CONSISTS OF BULLNOSE,CENTRALIZER,GR, CENTRALIZER,40-ARM CALIPER, CENTRALIZER, MEMORY TOOL,BATTERY, KNUCKLE JT,SHOCK ABSORBER,XO, BLIND SUB, GR, OAL=65.45' PU INJECTOR,MU COIL TO BHA&STAB ON WELL. 12:00 - 14:20 2.33 EVAL P PROD1 TEST QTS TO 250-PSI/3500-PSI FOR 5-MINUTES PER TEST.GOOD TESTS. RIH WITH OH CALIPER LOGGING BHA TO 9260',CIRCULATING AT.85-BPM/1250-PSI. 14:20 - 14:35 0.25 EVAL P PROD1 LOG TIE IN AND APPLY-2'CORRECTION. IA/OA= 100-PSI/220-PSI. 14:35 - 15:30 0.92 EVAL P PROD1 CONTINUE TO RIH CIRCULATING AT.5-BPM/ 1150-PSI. NO ISSUES THROUGH WINDOW OR ON TRIP TO 10,490'. Printed 11/5/2012 10:20:44AM u.. • North America-ALASKA- BP • Page 13 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:00 0.50 EVAL P PROD1 REDUCE PUMP RATE TO.25-BPM&MOVE COIL SLOWLY WHILE WAITING FOR CALIPER ARMS TO OPEN. IA/GA/PVT= 100-PSI/170-PSI/321-BBLS. MW IN=8.53-PPG/MW OUT=8.55-PPG. 16:00 - 16:20 0.33 EVAL P PROD1 POSITION TOOL AT 10,490'. ARMS OPEN AT 1613-HRS. LOG UP AT 30-FPM TO 8300'. CIRCULATE AT.5-BPM/1050-PSI. 16:20 - 17:40 1.33 EVAL P PROD1 STOP AT 8300'. ARMS CLOSE AT 17:31-HRS. FLOW CHECK WELL-NO FLOW. IA/OA=85-PSI/60-PSI. 17:40 - 20:00 2.33 EVAL P PROD1 POH FROM 8300'. CIRCULATE AT 1-BPM/ 1160-PSI. FLOW CHECK AT SURFACE. PJSM ON LAYING DOWN BHA. FLOW CHECK GOOD. TAG UP WITH BHA. 20:00 - 20:15 0.25 EVAL P PROD1 POP OFF,LD BHA. RETRIEVE ALL COMPONENTS. CENTRALIZER MISSING LOWER HALF OF AN ARM;4 SETS OF ARMS ON CENTRALIZER. 20:15 - 21:30 1.25 EVAL N PROD1 DISCUSS OPTIONS WITH BAKER FISHING, FIELD SUP, ODE. NOTIFIED THAT CALIPER RUN PRODUCED GOOD DATA. SEND TO HOUSTON FOR INTERPRETATION. DECISION IS TO RUN VENTURI BASKET. MOBILIZE BHA TO RIG. PRESSURE TEST NEW DUAL FLAPPER CHECK VALVES WHILE WAITING —-- _- ON BHA. 21:30 - 00:00 2.50 FISH N PROD1 WAIT ON BHA TO ARRIVE ON LOCATION 8/6/2012 00:00 - 01:15 1.25 FISH N PROD1 WAIT ON FISHING BHA TO ARRIVE ON LOCATION 01:15 - 02:00 0.75 FISH N PROD1 PJSM ON PICKING UP AND MAKING UP BHA. MU BHA:VENTURI BASKET,XO, BLIND SUB. EDC, P&C,WEAR SUB, LQC, UQC,XO,CTC. STAB ON,TEST QUICK TEST SUB. GOOD TEST. 02:00 - 05:45 3.75 FISH N PROD1 RIH WITH FISHING BHA AT MIN PUMP RATE. -CONDUCT KICK WHILE TRIPPING DRILL DURING TRIP INTO HOLE. GREAT RESPONSE BY TEAM. SIMULATED FLOW AT THE SHAKER. COIL OPERATOR SHUT IN HCR PER STANDING ORDERS DRILLER EXPLAINED HIS NEXT STEP OF LINING UP TO CLOSE THE CHOKE AND EQUALIZE BETWEEN THE HCR AND THE CHOKE. GOOD AAR AFTER DRILL INCLUDED DISCUSSION WITH A NEW ROUSTABOUT OF SHUT-IN PROCESS AND INDICATORS OF A KICK. -CONTINUE WITH RIH. PUW 28K AT 8000'. RIH TO 8400'. -BRING UP CIRCULATION TO MAX RATE OF 2.52 BPM BPM,3860 PSI. RUN DOWN WITH VENTURI AT 5 FPM THROUGH 4-1/2"TUBING AND INTO 9-5/8"CASING. PICK UP RATE TO 20 FPM DOWN TO 20'ABOVE TOP OF WHIPSTOCK. SLOW AGAIN TO 5 FPM TO PASS OVER WHIPSTOCK TRAY. STOP RUN ATWINDOW. FLOW CHECK AT WINDOW. Printed 11/5/2012 10:20:44AM North America -ALASKA- BP Page 14 of 22 Operation Summary Report AIL Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 1X3-01250(2,181,168.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release. 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:45 - 08:00 2.25 FISH N PROD1 POH WITH FISHING BHA WHILE CONTINUING TO PUMP AT 2.5 BPM,3750 PSI. STOP AT 300'AND FLOW CHECK WELL-NO FLOW. 08:00 - 09:00 1.00 FISH N PROD1 HOLD PJSM ON LD VENTURI BHA. LD VENTURI BASKET BHA-NO RECOVERY. IA/OA/PVT= 120-PSI/10-PSI/255-BBLS. 09:00 - 09:30 0.50 DRILL P PROD1 —HOLD PJSM ON MU DRILLING BHA. BHA CONSISTS OF-3-3/4"x 4-1/8"HCC BICENTER BIT,1.2-DEG 2-7/8"XTREME MOTOR,WWT ANTI-STALL TOOL,HOT, USMPR,DGS,DPS,EDC,P&C,WEAR SUB, LOC, UQC,XO,CTC. OAL=86.83' 09:30 - 10:00 0.50 DRILL P PROD1 PU INJECTOR,MU COIL TO BHA&STAB ON WELL. TEST QTS TO 250-PSI/3500-PSI FOR 5-MIN PER TEST. GOOD TESTS. IA/OA=90-PSI/10-PSI/254-BBLS. 10:00 - 11:50 1.83 DRILL P PROD1 RIH WITH DRILLING BHA TO 9280', CIRCULATING AT.4-BPM/1050-PSI. IA/OA/PVT=90-PSI/10-PSI/298-BBLS. 11:50 - 12:10 0.33 DRILL P PROD1 LOG TIE IN AND APPLY-3'CORRECTION 12:10 - 13:10 1.00 DRILL P PROD1 CONTINUE TO RIH. TAG OBSTRUCTION AT 9323'. PU WITHOUT ISSUE. REPEAT TAG AT SAME DEPTH. PU& DISCUSS WITH CTD FIELD SUPT. RIH TO TAG AT 9323.23'. PU TO GET WEIGHT BACK+.3'AT 9320.5'. INCREASE RATE TO.7-BPM/NO PSI INCREASE. RIH AT.8-FPM TO 9330.5'. REDUCE RATE TO.5-BPM AND PU THRU WINDOW WITHOUT ISSUE. DRY DRIFT WINDOW TO 9330'. NO ISSUES THRU EITHER DIRECTION. POH TO 9300'AND BRING PUMP BACK TO .3-BPM/1130-PSI. 13:10 - 14:15 1.08 DRILL P PROD1 CONTINUE TO RIH FROM 9330'. CIRCULATE AT 1-BPM/1450-PSI STAGING UP TO 1.5-BPM/1750-PSI THEN STAGING UP TO 2-BPM/2125-PSI THEN TO FINAL CIRC RATE OF 2.5-BPM/2690-PSI. TAKE JORPS"CHECK SHOTS"AT 10,251.6' AND 10,222'-NO ISSUES. OBTAIN SPRS. 14:15 - 14:45 0.50 DRILL P PROD1 MAD PASS RES DATA FROM 10,460'TO 10,500'AT 100-FPH. Printed 11/5/2012 10:20.44AM • North America -ALASKA- BP1. Page 15 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table@62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:45 - 16:20 1.58 DRILL —P PROD1 DRILL AHEAD FROM 10,500'. FREE SPIN=2.7-BPM/2870-PSI. DRILL AHEAD WITH 1 -2.5K-LBS DHWOB AND 200-400-PSI MOTOR WORK. VERY HIGH ROP(160-FPH). MAKE BHA WIPER TRIPS EVERY 50'DRILLED. ROP CONTINUES TO INCREASE. INCREASE BHA WIPER TRIP FREQUENCY. VIBRATION WHEN VERY BAD WHEN LESS THAN 1.5K-LBS DHWOB. SEE ONE HARD STALL AND ANTI-STALL TOOL APPEARS TO WORK-ABLE TO CONTINUE DRILLING WITHOUT PICKING UP OFF BOTTOM. • AT START,IA/OA/PVT/ECD=150-PSI/ 10-PSI/313-BBLS/9.38-PPG. MW IN- 8.6-PPG/MW OUT=8.56-PPG. AT END, IA/OA/PVT=210-PSI/20-PSI/ 295-BBLS. MW IN=8.60-PPG/ MW OUT= 8.55-PPG. 16:20 - 17:30 1.17 DRILL P PROD1 WIPER TRIP FROM 10,650'. PUMP AT 2.85-BPM/3160-PSI. SEE 5K-LB OVERPULL AT 9913'SHALE SECTION ON TRIP TO WINDOW. SEE SLIGHT SET DOWN AT 9913'SHALE AND MOTOR WORK SPIKE AT 10,030'AND 10,230' ON RIH. 17:30 - 19:30 2.00 DRILL P PROD1 DRILL AHEAD FROM 10,650'TO 10,800' 2.80 BPM,3700-3800 PSI,VARYING WOB DUE TO USE OF AST,9.41 PPG ECD,MW IN AND OUT 8.6 PPG AST(ANTI-STALL TOOL)WORKING AS PROJECTED WITH ACTIVATION THROUGH DIFFERENTIAL PRESSURE. HAD TO PICK UP COIL ONCE WITH STALL THAT THE AST DID NOT REACT TO. 19:30 - 21:45 2.25 DRILL P PROD1 WIPER TO WINDOW FROM 10,800'. SLIGHT OVERPULL AT 9914'. CONTINUE WITH WIPER TO WINDOW. TURN AROUND AND RUN BACK DOWN. SLIGHT SET DOWN AT 9414'BUT POPPED THROUGH EASILY. CONTINUE TO RIH WITH NO ISSUES. 21:45 - 22:30 0.75 DRILL P PROD1 BACK ON BOTTOM. FREE SPIN 3050 PSI AT 2.75 BPM. DRILL AHEAD FROM 10,800'WHILE TRUCKING IS BEING LINED UP FOR DISPLACEMENT. PUMP PRESSURES SHOWING SLIGHT SPIKE BUT AST WORKING AS EXPECTED. OUT RATES FLUCTUATING IN OPPOSITE CORRELATION WITH THE SPIKES(OUT RATE IS DROPPING WITH THE SPIKES). IN AND OUT RATES,PRESSURES CONSISTENT AFTER DRILLING BREAK THROUGH SLOW ROP SECTION AT 10,820'. Printed 11/5/2012 10:20:44AM • North America -ALASKA- BP • Page 16 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 DRILL P PROD1 TRUCKS ALL LINED UP FOR MUD SWAP. MAKE WIPER TRIP TO WINDOW,TIME HI-VIS PILL FOR ENTERING WINDOW. OPEN EDC, BRING ON PUMPS TO 3.4 BPM,JET ACROSS WHIPSTOCK TRAY. TAG AT 9322'. PU TO NEUTRAL PLUS 1/2',MOVE BACK DOWN SLOWLY AND MOVE PAST 9322'WITH NO ISSUES. WASH WHIPSTOCK DOWN TO BOTTOM AND BACK TO TOP OF WHIPSTOCK INTO THE 7"LINER. CONTINUE TO CHASE THE SWEEP UP HOLE. 8/7/2012 00:00 - 01:45 1.75 DRILL P PROD1 COMPLETE CIRCULATING BOTTOMS UP AND GETTING HI-VIS PILL OUT OF HOLE. SLIGHT INCREASE IN CUTTINGS ACROSS SHAKER. -CLOSE EDC,TIE-IN WITH+5-1/2' CORRECTION. 01:45 - 02:30 0.75 DRILL P PROD1 RIH WITH LATERAL DRILLING BHA FROM WINDOW. RECORD MANUAL AND ELECTRONIC STRAPS. BEGIN NEW MUD DOWN COIL TO COINCIDE WITH TAGGING BOTTOM. TRIP TO BOTTOM GOOD. NEW MUD AT BIT. 02:30 - 03:30 1.00 DRILL P PROD1 ON BOTTOM. BEGIN TO DRILL AHEAD FROM 10,850'WHILE MUD GETTING AROUND. FREE SPIN 2830 PSI AT 2.6 BPM. 2.55-2.6 BPM,3100-3170 PSI,9.43 PPG ECD, _ 1-1.4K WOB,AVERAGE OF 125 FPH ROP 03:30 - 06:30 3.00 DRILL P PROD1 WIPER TRIP TO WINDOW WITH NO ISSUES. NO OVERPULLS THROUGH TWO SHALE STRINGER ZONES. 06:30 - 08:00 1.50 DRILL P PROD1 DRILL AHEAD FROM 11,000'TO 11,150'. FREE SPIN=2.75-BPM/2850-PSI. DRILL AHEAD WITH HIGH ROP, MAKING BHA WIPER TRIPS EVERY 50'DRILLED. DHWOB= 1 -1.5K-LBS,MOTOR WORK AT 150-300-PSI. AT START, IA/OA/PVT/ECD= 110-PSI/ 30-PSI/330-BBLS/9.3-PPG. MW IN= 8.57-PPG/MW OUT=8.53-PPG. AT END, IA/OA/PVT/ECD= 135-PSI/25-PSI /318-BBLS/9.4-PPG. MW IN=8.55-PPG/ 8.50-PPG. 08:00 - 10:30 2.50 DRILL P PROD1 WIPER TRIP FROM 11,150'TO WINDOW. CIRCULATE AT 2.8-BPM/2850-PSI. NO ISSUES SEEN ON TRIP TO WINDOW. 10:30 - 11:45 1.25 DRILL P PROD1 DRILL AHEAD FROM 11,150'TO 11,195'. FREE SPIN=2.62-BPM/2670-PSI. DRILL AHEAD WITH UNABLE TO DROP ANGLE AND TOO HIGH TO PLAN. ROP STOPS AT 11,195.5'. DISCUSS WITH GEO&DD AND DECIDE TO POH. AT START,IA/OA/PVT/ECD=170-PSI/ 120-PSI/319-BBLS/9.32-PPG.MW IN= 8.56-PPG/MW OUT=8.53-PPG. AT END,IA/OA/PVT/ECD=210-PSI/ 190-PSI/316-BBLS/9.37-PPG. MW IN= _8.54-PPG/MW OUT=8.51-PPG. 11:45 - 13:15 1.50 DRILL P PROD1 -FLOW WELL-NO FLOW. POH FROM 11,195'TO WINDOW, CIRCULATING AT 2.75-BPM/2890-PSI. DROP PUMP RATE AND PULL THROUGH WINDOW-NO ISSUES. Printed 11/5/2012 10:20:44AM North America-ALASKA- BP • Page 17 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) , Start Date: 7/28/2012 End Date. 8/10/2012 X3-01250(2,181,168 00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12.00:OOAM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:15 - 16:00 } 2.75 DRILL P PROD1 FLOW CHECK WELL ABOVE WINDOW-NO FLOW. OPEN EDC&CIRCULATE AT 3.65-BPM/ 3200-PSI. POH AT 65-FPM. NO INCREASE IN CUTTINGS SEEN FROM BOTTOMS UP FROM INSIDE THE WINDOW. "MAKE 200'JOG AT SURFACE. IA/OA=230-PSI/260-PSI. 16:00 - 17:30 1.50 DRILL P PROD1 FLOW CHECK WELL. HOLD PJSM ON LD BHA. LD DRILLING BHA. INNER MANDREL OF AST IS SEVERLY DAMAGED. MISSING ONE PIECE OF BERYLLIUM COPPER—2"X 3"X 1/2"THICK. 17:30 - 18:00 0.50 DRILL N DEAL • PROD1 DISCUSS SITUATION WITH ODE&SUPT. DEVELOP PLAN FORWARD TO DROP AST FROM NEXT BHA. 18:00 - 22:00 4.00 DRILL N. DEAL PROD1 DEVELOP PLAN`TO SET ALUMINUM-BILLET AT 10,920'WITH 30DEG LOHS(330 DEG ROHS).REVIEW WITH CTD SUPERVISOR AND APPROVED BY ODE AND WTL CALL OUT 3-5/8"BILLET FROM BTT. 22:00 - 00:00 2.00 DRILL N DFAL PROD1 WAIT FOR BTT TO ARRIVE ON RIG. BETWEEN 20.00 AND 00:00HRS, FILLED UP WELL WITH ALTOGETHER 5.5BBLS. 8/8/2012 00:00 - 01:00 1.00 DRILL N DFAL • PROD1 BTT ARRIVE ON LOCATION.LIFT 3-5/8"BILLET AND RUNNING TOOLS ON RIGFLOOR. 01:00 - 01:15 0.25 DRILL N DFAL PROD1 HOLD PJSM BEFORE MAKING UP BHA#10. 01:15 - 02:15 1.00 DRILL M DFAL PROD1 MAKE UP BHA COMPLETE WITH BILLET. PICK UP AND STAB ON INJECTOR. PRESSURE-TEST QTS TO 300PSI/5MINS AND 4,000PSI/5MINS. OPEN'EDC. 02:15 - 04:30 2.25 DRILL N DFAL PROD1 BREAK CIRCULATION AND COMMENCE RIH AT 73FT/MIN. CIRC PRESSURE=916PSI AT 0.25BPM. PVT= 232BBLS. 04:30 - 04:45 0.25 DRILL N DFAL PROD1 RUN IN HOLE TO 8,350FT AND TAKE 32K LBS PICK UP WEIGHT(PUW). 04:45 - 05:00 0.25 DRILL N DFAL PROD1 START LOGGING FOR TIE-IN AND APPLY-3FT CORRECTION TO 9,179'. 05:00 - 05:15 0.25 DRILL N DFAL PROD1 RUN TO 9,280'.STOP PUMPING AND CLOSE EDC. REPEAT WEIGHT CHECK AND OBSERVE 37K LBS PUW. CONTINUE RIH. _ 05:15 - 05:30 0.25 DRILL N DFAL PROD1 RUN THROUGH WINDOW TO 9,330'-DO NOT OBSERVE ANY INDICATION FOR ANY JUNK (I.E. LOST CENTRALIZER ARM). CONTINUE TO 9,350'AND PERFORM TIE-IN LOG TO RA-TAG-OBSEVRE OFT CORRECTION. 05:30 - 05:45 0.25 DRILL N DFAL PROD1 CONTINUE RIH AT 35FT/MIN. 05:45 - 06:20 0.58 DRILL N DFAL PROD1 SIT DOWN WEIGHT WHEN RUNNING THROUGH SHALE AT 9,920'.PICK UP TO CONFIRM BILLET IS NOT SET PREMATURELY. ALL GOOD, SO CONTINUE RIH. Printed 11/5/2012 10:20:44AM North America-ALASKA- BP Page 18 of 22 Operation Summary Report Common Well Name: C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:20 - 06:30 0.17 DRILL N DFAL PROD1 RUN PAST SETTING DEPTH AND PICK UP TO HAVE BHA IN TENSION.STOP AT 10,931.34' BIT DEPTH TO PLACE TOP OF BILLET AT 10,920'. 06:30 - 06:45 0.25 DRILL N DFAL PROD1 COMMENCE PUMPING TO SET BILLET. SEE SHEAR AT 3300-PSI. SET DOWN 3.5K-LBS TO CONFIRM SET. 06:45 - 07:45 1.00 DRILL N DFAL PROD1 POH WITH BILLET RUNNING TOOLS. SEE 20K-LB OVERPULL AT 10,805'. RIH- FREE. PU AND SEE OVERPULL AT 10,820'. RIH-FREE. PU AND SEE 15K-LB OVERPULL AND THEN POP FREE AT 10,830'. CONTINUE TO POH,CIRCULATING AT .67-BPM/1160-PSI. NO ISSUES ON TRIP TO WINDOW. IA/OA=80-PSI/10-PSI. 07:45 - 10:00 2.25 DRILL N DFAL PROD1 DROP PUMP TO MIN RATE&PASS THROUGH WINDOW WITHOUT ISSUE. FLOW CHECK WELL-NO FLOW. POH WITH BILLET RUNNING BHA, CIRCULATING AT 3.35-BPM/3130-PSI. IA/OA=120-PSI/10-PSI. 10:00 - 11:00 1.00 DRILL N DFAL PROD1 FLOW CHECK WELL AT 300'-NO FLOW. HOLD PJSM ON LD BHA. LD BILLET RUNNING BHA. NO ISSUES NOTED. • 11:00 - 12:00 1.00 DRILL N WAIT PROD1 FILL WELL WITH 2-BBLS MUD. CLOSE SWAB VALVE,CHOKE&KILL LINES. INSTALL NIGHT CAP. • TEST NIGHT CAP TO 250-PSI/3500-PSI FOR 5-CHARTED MIN PER TEST. GOOD TESTS. 12:00 - 12:30 0.50 DRILL` -- N WAIT PROD1 HOLD PJSM FOR SCR MAINTENANCE TO BE PERFORMED BY PEECO REP&NORDIC ELECTRICIAN. DISCUSS ENERGY ISOLATION METHODS&PROCEDURE FOR THE JOB,THE NEED FOR NON-ESSENTIAL PERSONNEL TO VACATE THE RIG, IDENTIFY COMMUNICATION METHODS ARE LIMITED TO HARMONY AND RIG RADIO,AND ASSIGN PEOPLE TO POSITIONS. 12:30 - 17:45 5.25 DRILL N WAIT PROD1 SHUT DOWN RIG. ELECTRICIAN&PEECO REP REPLACE CURRENT TRIPS ON BREAKERS IN SCR ROOM. 17:45 - 20:00 2.25 DRILL N WAIT PROD1 START GENERATORS AND PERFORM LOADTEST(PUMPING 4BPM ON BOTH MUD PUMPS).PEECO-ENGINEER APPROVES TEST WHICH COMPLETES WORK IN THE SCR ROOM. 20:00 - 20:15 0.25 DRILL N WAIT PROD1 OPEN UP WELL AND CONFIRM WHP=OPSI AND FILL WELL WITH 5.5BBLS. 20:15 - 20:45 0.50 DRILL N WAIT PROD1 PERFORM 15MINS FLOWCHECK AND HOLD PJSM WITH CREWS 20:45 - 21:45 1.00 DRILL N DFAL PROD1 MU BHA#11 WITH 2-7/8"EXTREME,AKO= 1.4DEG AND 4.125"BI-CENTER HCC-BIT(NO AST). STAB ON INJECTOR. 21:45 - 22:00 0.25 DRILL N DFAL PROD1 TEST QTS TO 300PSI/5MIN AND 3,500PSI/ 5MINS. Printed 11/5/2012 10:20:44AM • North America -ALASKA- BP Page 19 of 22 O'eration Summary Report Common Well Name:C-09 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00.00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 DRILL N DFAL PROD1 START RIH. CIRC PRESSURE=1,055PSI AT 0.35BPM. PVT=211 BBLS, IA=73 PSI / OA=7 PSI RIH TO 9,286'AND PERFORM WEIGHT-CHECK 35K LBS. 8/9/2012 00:00 - 00:20 0.33 DRILL N DFAL PROD1 PERFORM TIE-IN LOG TO RA-TAG.APPLY A -3FT DEPTH CORRECTION 00:20 - 01:10 0.83 DRILL N DFAL PROD1 CONTINUE RIH BUT SIT DOWN AT 9,920'.PICK UP AND WORK THROUGH WITH REDUCED PUMP RATE. 01:10 - 01:20 0.17 DRILL N DFAL PROD1 RIH TO 10,900'AND OBTAIN SLOW PUMP RATES: PUMP#1: PUMP#2: 2.7 BPM-2,990 PSI-121 SPM2.75 BPM-2,980 PSI-125 SPM 1.0 BPM-1,630 PSI-43 SPM1.0 BPM-1,670 PSI-46 SPM 0.5 BPM-1,450 PSI-25 SPMO 5 BPM-1,350 PSI-21 SPM 01:20 - 01:30 0.17 DRILL . N DFAL PROD1 ORIENT SIT TO 330DEG ROHS(30DEG LOHS). STOP PUMPS AND DRY-TAG AT TOP OF BILLET AT 10,922.4'. PICK UP AND BRING PUMPS BACK ONLINE TO 2.6BPM(FREESPIN 2,750PSI). PVT=259 BBLS,IA=118 PSI/OA=7 PSI. 01:30 - 03:00 1.50 DRILL N DFAL PROD1 SLOW DOWN AT 4'ABOVE BILLET,TAG BILLET AT 10,921.8'.SET BRAKE AND START TIME-MILLING FOR FIRST FOOT AT 1 FT/HR. DO NOT SEE ANY MOTORWORK UNTIL 10,922.1'.THEREAFTER NOTICE REGULAR MOTORWORK/DRILL-OFF PATTERN EVERY TIME COIL IS MOVED. 03:00 - 03:20 0.33 DRILL N DFAL PROD1 START APPLYING 200-300PSI MOTORWORK. CIRC P=2,900 PSI/WOB=1.1 K LBS/ECD= 9.34 PPG MM IN=2.50 BPM/MM OUT=2.52 BPM MM IN=8.56 PPG/MM OUT=8.55 PPG IA=190 PSI/OA=9 PSI PVT=252 BBLS 03:20 - 03:40 0.33 DRILL N DFAL PROD1 NOTICE DROP IN WOB FROM-1.2K LBS DOWN TO 0.5LBS AT 10,926'. GOOD INDICATION THAT BIT IS IN FORMATION. DRILL TO 10,945'. DROP PUMP-RATE TO 0.25BPM AND PICK UP WITHOUT ANY ISSUE. TURN AROUND AND DRY-DRIFT THROUGH BILLET,AGAIN WITHOUT ANY ISSUE. 03:40 - 05:00 1.33 DRILL N DFAL PROD1 DRILLING AHEAD THE LATERAL SECTION WITH GOOD ROP'S OF 120-150 FT/HR. CIRC P=3,116 PSI/FREESPIN=2,750PSI/ WOB=1.46 K LBS/ECD=9.37 PPG MM IN=2.57 BPM/MM OUT=2.56 BPM MM IN=8.56 PPG/MM OUT=8.53 PPG IA=201 PSI/OA=10 PSI/PVT=252 BBLS 05:00 - 06:15 1.25 DRILL N DFAL PROD1 PERFORM FIRST 150'WIPER TRIP TO WINDOW,SLOWING DOWN PUMPRATE WHEN PULLING THROUGH THE BILLET. Printed 11/5/2012 10:20:44AM • 'North America -ALASKA- BP ! Page 20 of 22 O•eration Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 7/28/2012 End Date: 8/10/2012 X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:15 - 07:30 1.25 DRILL N DFAL PROD1 PERFORM WIPER TO 9,350',TURN AROUND AND RUN IN HOLE. SLOW PUMP RATE THROUGH 9900'SHALE AND ACROSS BILLET. NO ISSUES. OBTAIN SPRS WITH BOTH PUMPS. 07:30 - 08:45 1.25 DRILL N DFAL PROD1 DRILL AHEAD FROM 11,050'TO 11,195' FREE SPIN=2.7-BPM/2910-PSI. HIGH ROP NECESSITATES BHA WIPER TRIPS EVERY 50'DRILLED. DRILL WITH 1 -2K-LBS DHWOB AND 200- 600-PSI MOTORWORK. VIBRATIONS ARE MOSTLY ABOVE 4. AT START,IA/OA/PVT/ECD=250-PSI/ 30-PSI/242-BBLS/9.42-PPG. MW IN= 8.59-PPG/MW OUT=8.61-PPG. AT END, IA/OA/PVT/ECD=290-PSI/60-PSI /240-BBLS/9.45-PPG. MW IN=8.59-PPG/ MW OUT=8.53-PPG. 08:45 - 09:00 0.25 DRILL P PROD1 DRILL FROM 11,195'TO 11,200'WITH ABOVE PARAMETERS. 09:00 - 11:30 2.50 DRILL P PROD1 WIPER TRIP FROM 11,200'TO WINDOW. CIRCULATE AT 2.8-BPM/3050-PSI. REDUCE RATE PAST BILLET AND THROUGH SHALE SECTION FROM 9900'TO 9950'. NO ISSUES. IA/OA=330-PSI/200-PSI. 11:30 - 12:30 1.00 DRILL P PROD1 DRILL AHEAD FROM 11,200'TO 11,294'. FREE SPIN=2.8-BPM/3060-PSI. AT START,IA/OA/PVT.ECD=330-PSI/ 200-PSI/315-BBLS/9.45-PPG. MW IN= 8.64-PPG/MW OUT=8.57-PPG. AT END,IA/OA/PVT/ECD=340-PSI/ 220-PSI/321-BBLS/9.49-PPG. 12:30 - 13:00 0.50 DRILL N SFAL PROD1 LOSE MICROMOTION DATA&TOTCO PVT. INVESTIGATION SHOWS UPS SUPPLYING POWER TO ABOVE EQUIPMENT FAILED. WIPER TO—10,900 CIRCULATING AT 2.5-BPM/ 2780-PSI. MANUALLY STRAP PITS&WEIGH MUD EVERY 15-MIN UNTIL POWER RESTORED. NOTIFY CTD FIELD SUPT OF SITUATION. RESTORE POWER TO IN&OUT MM&TOTCO PVT. 13:00 - 14:00 1.00 DRILL P PROD1 ELECT TO CONTINUE WIPER TRIP TO WINDOW. CIRCULATE AT 2.6-BPM/2920-PSI. 14:00 - 16:00 2.00 DRILL P PROD1 DROP PUMP RATE&PULL THROUGH WINDOW WITHOUT ISSUE. OPEN EDC. ESTABLISH CIRCULATION WITH BOTH PUMPS AT 3.8-BPM AND POH AT VARIOUS SPEEDS TO LOAD TEST NEW CURRENT TRIPS IN SCRS. NO ISSUES RIH TO JUST ABOVE WINDOW CONTINUING CIRCULATING AT 4-BPM/3650-PSI. POH UP TO 7500'AND RIH. NO INCREASE IN CUTTINGS FROM BOTTOMS UP FROM THE WINDOW. CLOSE EDC. IA/OA=360-PSI/260-PSI. Printed 11/5/2012 10:20:44AM • North America-ALASKA- BP Page 21 of 22 Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date: 8/10/2012 ,X3-01250(2,181,168.00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 DRILL P PROD1 TIE INTO SAG RIVER. APPLY+8' CORRECTION. 16:30 - 17:30 1.00 DRILL P PROD1 RIH THROUGH WINDOW WITH PUMP AT MIN RATE. SEE SLIGHT SET DOWN,STOP COIL AND POP FREE AT 9323'(BOTTOM OF WINDOW). LOWER PUMP RATE TO.5-BPM THROUGH "9900'SHALE AND SEE SLIGHT SET DOWN AT 9923'. RESUME FULL PUMP RATE AND SLIGHT SET DOWN AT 10,023'. CONTINUE TO WIPER TO BOTTOM. LOWER PUMP RATE ACROSS BILLET,NO ISSUES. CIRCULATE AT 2.6-BPM/2890-PSI. IA/OA=305-PSI/385-PSI. 17:30 19:15 1.75 DRILL P PROD1 DRILL AHEAD FROM 11294'. FREE SPIN=2.6-BPM/2850-PSI. AT START, IA/OA/PVT/ECD=310-PSI/ 380-PSI/313-BBLS/9.5-PPG. 19:15 - 19:30 0.25 DRILL P PROD1 AT 11,450,OBTAIN SLOW PUMP RATES: PUMP#1: PUMP#2: 2.8 BPM-2,875 PSI- 117 SPM2.7 BPM-2,930 PSI- 118 SPM 1.0 BPM- 1,775 PSI-46 SPM1.0 BPM-1,720 PSI-43 SPM 0.5 BPM-1,450 PSI-20 SPM0.5 BPM-1,487 PSI-21 SPM 19:30 - 21:00 1.50 DRILL P PROD1 DRILL TO 11,450'AND PERFORM 1ST 150' INDOW. 20:00-GEO CALLS AND ANNOUNCES THAT NEW TARGET TD IS 11,650'. 20:45-IA-PRESSURE REACHES 480PSI.AS MAX PRESSURE IS 500PSI,BLEED DOWN TO 220PSI(OBSERVE ONLY GAS RETURNING, NO FLUIDS).OA=408PSI. 21:00 - 22:00 1.00 DRILL P PROD1 TURN AROUND AT 9,350'AND RUN BACK IN HOLE. ORIENT BIT TO 330DEG AND REDUCE PUMP RATE TO 0.2BPM WHEN PASSING BILLET. 22:00 - 22:45 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD LATERAL SECTION THROUGH CLEAN SANDS. ROP=105 FPH,WOB=1.99K LBS AND CIRC PRESSURE=3,058 PSI AT 2.47 BPM(FREE SPIN=2,699 PSI AT 2.42 BPM). PVT=298 BBLS.LOSSES ARE-1 BBLS/HR. MW IN=8.61 PPG / MW OUT=8.61 PPG / ECD=9.54 PPG IAP=226 PSI / OAP=437 PSI 22:45 - 23:15 0.50 DRILL P PROD1 NOTICE SUDDEN INCREASE IN XY-VIBARTION AROUND 11,485'UP TO"6" AND ROP DROP DOWN TO VERY LOW -10FT/HR.ND 8,973'ND SS. APPEARS BIT HAS HIT A SHALE,HENCE COME UP-1FT. 23:15 - 00:00 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD WITH ROP BETWEEN 100 AND 150FT/HR. Printed 11/5/2012 10:20:44AM • North America-ALASKA- BP Page 22 of 22 L . Operation Summary Report Common Well Name:C-09 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:7/28/2012 End Date:8/10/2012 X3-01250(2,181,168.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/10/2012 00:00 - 00:40 0.67 DRILL P PROD1 DRILL AHEAD WITH ROP=145 FPH FOR THE MOST,BUT SEE INDICATION OF SHALE (WHICH RESULTS IN DROP OF ROP) PERIODICALLY. WOB=1.29K LBS AND CIRC PRESSURE= 3,362 PSI AT 2.68 BPM.PVT=293 BBLS. MW IN=8.59 PPG / MW OUT=8.61 PPG / ECD=9.59 PPG IAP=283 PSI / OAP=485 PSI 00:40 - 01:30 0.83 DRILL P PROD1 PERFORM WIPER TRIP TO BILLET. 01:30 - 02:00 0.50 DRILL P PROD1 DRILLING AHEAD WITH ROP'S BETWEEN 80 TO 90FT/HR.DRILL TO 11,650'-GEO CONFIRMS DEPTH AS TD.DD TAKES FINAL SURVEY SHOT,BEFORE PICKING UP FOR WIPER TRIP. 02:00 - 03:30 1.50 DRILL P PROD1 PERFORM FINAL WIPER TRIP TO WINDOW. CONFIRM BHCT AS 152-154DEG F. 03:30 - 03:40 0.17 DRILL P PROD1 PICK UP TO 9,350'AND LOG TIE-INTO RA-TAG.APPLY-3.5'DEPTH CORRECTION. 03:40 - 04:50 1.17 DRILL P PROD1 RUN BACK IN HOLE,SIT DOWN WEIGHT ON SHALE AT 9,920'(AS BEFORE). AT 11,075'START PUMPING 5OBBLS LINER -RUNNING PILL. RE-TAG CORRECTED TD AT 11,653'. 04:50 - 05:00 0.17 DRILL P PROD1 PERFORM FLOW-CHECK AT TD.ACHIEVE GOOD 5MIN NO-FLOW. 05:00 - 06:30 1.50 DRILL P PROD1 POOH AT 25 FPM LAYING IN LINER RUNNING PILL AT 0.5 BPM. 06:30 - 10:00 3.50 DRILL P PROD1 PULL THROUGH WINDOW WITHOUT ISSUE. FLOW CHECK WELL-NO FLOW. OPEN EDC. RIH&JET WHIPSTOCK TRAY. PUMP 40-BBL HI VIS PILL&POH JETTING 7" AT 3.7-BPM/3850-PSI. PAINT FLAGS AT 8100' EOP(PINK)AND 5,800' EOP(YELLOW). NO NOTABLE INCREASE IN CUTTINGS WITH SWEEP. MAKE 300'JOG AT SURFACE. ALLUMINUM BILLET RETURNS FROM JETTING NEAR SURFACE. IA/OA=200-PSI/330-PSI. 10:00 - 10:45 0.75 DRILL P PROD1 FLOW CHECK AT 300'-NO FLOW. CLOSE EDC HOLD PJSM ON LD DRILLING BHA. DISCUSS DROPPED OBJECTS POTENTIALS.. POSITIONS OF PEOPLE AND WELL CONTROL CONSIDERATIONS. SET INJECTOR BACK OVER CIRC HOLE. BLOW DOWN BHA. LD DRILLING BHA. BHI REPORTS HOT IS DAMAGED BASED ON GAP NEAR BOTTOM OF TOOL GRADE BIT 2-2-CT-A-X-I-BU-TD MINIMAL BALLING OF GAUGE CUTTERS AND CHIPPED CUTTERS ON NOSE AND GAUGE. IA/OA=100-PSI I 520-PSI. 10:45 - 11:00 0.25 DRILL P PROD1 HOLD PJSM ON REMOVE UQC/BOOT E-LINE /PUMP E-LINE SLACK OUT OF COIL. PU INJECTOR. REMOVE BHI UQC. BOOT E-LINE. Printed 11/5/2012 10:20:43AM North America-ALASKA- BP Page 1 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/10/2012 End Date:8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing I Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/10/2012 11:00 - 12:00 1.00 CASING P RUNPRD PU 2-JTS OF 2-3/8"PH6 AND RIH. PU INJECTOR AND MU TO PH6. STAB ON WELL. PUMP 20-BBLS RIG WATER INTO COIL. VARY PUMP RATES FROM 5-BPM TO 4.5-BPM. ,HEAR WIRE MOVING INITIALLY. UNSTAB INJECTOR. RECOVER 223'OF ELINE -SLACK. LEAVES 77'CALCULATED E-LINE SLACK. SET INJECTOR BACK OVER CIRC HOLE. LD 2-JTS OF 2-3/8"PH6. 11:45 - 12:30 0.75 CASING P RUNPRD PU INJECTOR AND CUT OFF CTC. RE-BOOT ELINE. DRESS COIL&INSTALL BTT EXTERNAL CTC. PULL TEST TO 35K-LBS. PRESSURE TEST TO 3500-PSI. GOOD TESTS. 12:30 - 14:00 1.50 CASING P RUNPRD MU BALL DROP NOZZLE&STAB ON INJECTOR. PUMP 3/4"DRIFT BALL AROUND. HEAR MOVING IN COIL AND OVER GOOSENECK AT 57.7-BBLS PUMPED MINIMAL INDICATION OF BALL LANDING BUT SLIGHT PRESSURE INCREASE NOTED AT 57.9-BBLS. :JET STACK AT 2.75-BPM/2180-PSI. UNSTAB INJECTOR. LD BALL DROP NOZZLE. SET INJECTOR BACK ON LEGS OVER CIRC HOLE. 14:00 - 17:30 3.50 CASING P RUNPRD RU TO RUN LINER. WSL, DRILLER&BTT REP CONFIRM JOINT NUMBERS, PIPE SHED LAYOUT&FLAGGING. BRING ALL JEWLERY TO RIG FLOOR. RU HANDLING EQUIPMENT, DRIFT,AND FARR TONGS. 17:30 - 19:00 1.50 CASING P RUNPRD START MAKING UP LINER:MU 2-7/8" INDEXING GUIDE SHOE,FLOAT COLLAR AND FULL JOINT OF 2-7/8"L-80 STL LINER, FOLLOWED BY FURTHER FLOAT COLLAR, 2-7/8"L-80 STL PUP,LATCH COLLAR 2-7/8" L-80 STL PUP AND STAGE COLLAR.START MAKING UP 2-7/8"6.4#L-80 STL LINER. INSTALL SAFETY JOINT DURING CREW-CHANGE. 19:00 - 19:15 0.25 CASING P RUNPRD HOLD PJSM ONCE ALL CREW HAS ARRIVED ON RIG FROM SLT-MEETING. 19:15 - 19:45 0.50 CASING P RUNPRD CONTINUE MAKING UP 2-7/8-LINER. 19:45 - 20:30 0.75 CASING P RUNPRD MU 2-7/8"LINER JOINT#8. PULL JOINT#8 (31.91')AND REPLACEWITH JOINT#46 (31.98"). CONTINUE MAKING UP LINER. 20:30 - 21:30 1.00 CASING P RUNPRD NOTICE THAT MUD BUCKET DOESN'T DRAIN ANYMORE.PAUSE RUNNING LINER TO CHECK AND CLEAN MUD BUCKET'S DRAINS. 21:30 - 22:45 1.25 CASING P RUNPRD COMPLETE MU 39 JOINTS OF 2-7/8"LINER. 22:45 - 23:00 0.25 CASING P RUNPRD REDRESS FARR TONGS FOR HANDLING '3-1/4"LINER. Printed 11/5/2012 10:21:33AM North America -ALASKA- BP Page 2 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:O0AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 23:00 - 00:00 1.00 CASING P RUNPRD INSTALL X-OVER 3-3/16"TCII(BOX)X 2-7/8" STL(PIN)AND CONTINUE WITH MU 3-1/4" LINER 8/11/2012 00:00 - 00:15 0.25 CASING P RUNPRD CONTINUE MU 3-114"LINER. 00:15 - 00:30 0.25 CASING P RUNPRD """"CONDUCT KICK WHILE TRIPPING DRILL DRILLER SOUNDED RIG FLOOR ALARM HORN.CREW REACTED SWIFTLY AND INSTALLED SAFETY JOINT ON TOP OF 3-1/4" LINER WITHIN 2:00MINS.THE DRILLER THEN SIMULATED PLACING THE THE SAFETY JOINT ACROSS THE BOP AND CLOSING THE UPPER RAM AND HCR.A DISCUSSION OF HOW TO VERIFY THE SHUT-IN PRESSURE THEN CONCLUDED THE DRILL. 00:30 - 01:30 1.00 CASING P RUNPRD FILL LINER HALF-WAY THROUGH,USING THE RIG FLOOR WATER HOSE. 01:30 - 03:00 1.50 CASING P RUNPRD COMPLETE-MU 39 JOINTS OF 3-1/4"LINER. 03:00 - 03:30 0.50 CASING _ P RUNPRD INSTALL X-OVER 3-1/2"TCII(PIN)X1/1 . STL(BOX)AND REDRESS FARR TONGS FOR HANDLING 3-1/4"LINER. 03:30 - 05:00 1.50 - CASING Ij RUNPRD CONTINUE WITH MU 3-1/2"LINER. 05:00 - 05:30 0.50 CASING P RUNPRD MU BTT GEN2 DEPLOYMENT SLEEVE AND SELRT. 05:30 - 06:30 1.00 CASING P RUNPRD MU UP BHA#12(LINER RUNNING BHA)WITH 4X JOINTS OF 2-3/8"PI-16. MEANWHILE WSL,TP AND BTT-HAND DOUBLE-CHECK LINER LEFT IN PIPESHED- NUMBERS ALL MATCH. 06:30 - 07:00 0.50 CASING P RUNPRD PU INJECTOR AND MU COIL TO LINER. STAB INJECTOR ON WELL. PRESSURE TEST QTS TO 250-PSI/3500-PSI FOR 5-MINUTES. GOOD TEST. IA/OA=50-PSI/10-PSI. 07:00 - 08:30 1.50 CASING P RUNPRD ESTABLISH CIRCULATION AT.5-BPM/ 1250-PSI. SET PUMP TRIPS TO 2000-PSI. RIH WITH LINER. 08:30 - 09:30 1.00 CASING P RUNPRD STOP AT 5800'EOP FLAG(SHOULD BE AT 9207.4'CTDS DEPTH). CTDS DEPTH SHOWS 9215.9'WHICH ISA-8.3' CORRECTION FACTOR. MECHANICAL COUNTER SHOWS 5800'. INCREASE PUMP RATE TO.9-BPM/1700-PSI TO CIRCULATE OUT ALL FRESH WATER USED TO FILL LINER. IA/OA=60-PSI/10-PSI. 09:30 - 10:30 1.00 CASING P RUNPRD REDUCE RATE TO.5-BPM/1630-PSI&RIH AT 50-FPH. NO ISSUES PASSING THROUGH WINDOW. SEE 8100'EOP FLAG(PINK)AT 11,516'CTDS DEPTH. SHOULD BE AT 11,507.4'. CORRECTION FACTOR IS-8.6'. TAG TD AT 11,661'WITH 10K-LBS DOWN. PU AND SEE BREAKOVER 10,649'WITH PU WT= 45K-LBS. RIH WT=12K-LBS. RIH AND TAG TD AT 10,659'WITH 8K-LBS. REPEAT BREAKOVER WITH SAME RESULTS. TAG TD LIGHTLY AT 11,656'. IA/OA=80-PSI/10-PSI. Printed 11/5/2012 10:21:33AM lIrf North America-ALASKA- BP ` Page 3 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date: 8/10/2012 End Date:8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release:8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:30 - 11:45 1.25 CASING P RUNPRD PU TO POSITION BALL DROP SUB. PUMP 10-BBLS KCL-LAUNCH 5/8"STEEL BALL IN MIDDLE OF PILL WITH 1000-PSI BEHIND IT. HEAR BALL ROLLING LOUD& CLEAR. CHASE AT 2-BPM/2300-PSI. HEAR BALL LEAVE REEL HOUSE WITH 33.3-BBLS --PUMPED. SLOW RATE TO.75-BPM/1470-PSI WITH 41-BBLS AWAY.BALL SAT AT 51.2-BBLS AWAY. PRESSURE UP AND SEE BALL SEAT SHEAR AT 4700-PSI. PU AND SEE BREAKOVER AT 11,654'+2'TO 11,252'WITH 26K-LBS UP WEIGHT. RELEASED FROM LINER SLACK BACK OFF WITH 10K-LBS DOWN TO 11,660'. 11:45 - 16:00 4.25 CEMT P RUNPRD DISPLACE WELL TO 8.4-PPG 1%KCL. CIRCULATE A1'2-BPM/2180-PSI INITIALLY. 1300-HRS: SPOT UP SLB CEMENTING&RU LINES. 1330-HRS: GAVE AOGCC 24-HR NOTICE OF BIWEEKLY BOPE TEST. 1335-HRS: AOGCC REP BOB NOBLE WAIVED STATE'S RIGHT TO WITNESS BOPE TEST. WITH WELL FULLY DISPLACED,2-BPM/ 890-PSI. IA/OA=90-PSI/10-PSI. 16:00 - 16:30 0.50 CEMT P RUNPRD HOLD PJSM WITH RIG CREW,CTS CREW, SLB CEMENTING CREW, BTT, SCS,CH2 TRUCKERS.AND LEADERSHIP TEAM. DISCUSS ORDER OF OPERATIONS. HAZARDS OF HIGH PRESSURE PUMPING. STOPPING THE JOB IF NECESSARY. COMMUNICATION THROUGHOUT THE JOB. BATCH UP 45BBLS CEMENT Printed 11/5/2012 10:21:33AM North America -ALASKA- BP Page 4 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 18:30 2.00 CEMT P RUNPRD PUMP 5-BBLS 8.4-PPG 1%KCL FOLLOWED BY `39-BBLS 15.8-PPG CLASS G CEMENT SLURRY. DISPLACE CEMENT WITH 8.4-PPG 1%KCL "WITH BIOZAN. !MAL CIRC PRESSURE= 2,490PSI @2BPM,DROPPPING DOWN TO W.`�,�iJ\ 770PS1 @ 2BPM.STOP PUMPS WITH 2-BBLS CEMENT LEFT ABOVE LINER RUNNING TOOL. C PU TO BREAKOVER(11,653.5')PLUS 13' (11,640').SET DOWN 10K-LBS AT 11,650'(10' HIGHER THAN BEFORE). LAUNCH PEEWEE DART AND BUMP PLUG WITH 630-PSI.PU AND SIDE EXHAUST 5-BBLS. -OPEN BAKER CHOKE&SET BACK DOWN 10K-LBS TO 11,650'. CLOSE BAKER CHOKE&PRESSURE UP TO 3,200-PSI TO SHEAR LINER WIPER PLUG. CHASE LINER WIPER PLUG WITH BIO AT 1.5-BPM&CIRC PRESSURE=1,660-PSI. BUMP PLUG WITH 23.9-BBLS(0.1-BBLS OVER CALCULATED VOLUME)AND PRESSURE UP TO 3,300-PSI.HOLD PRESSURE. -BASED ON OUT MM,35-BBLS CEMENT BEHIND LINER. OPENBAKER CHOKE AND CHECK FLOATS- GOOD FLOAT AND NO FLOW CHECK. PRESSURE UP TO 1000-PSI AND PU.SEE PRESSURE DROP AT 11,642'. PU AND UNSTING OUT OF LINER. PUMP 5 BBLS OF BIOZAN AT DEPTH THEN POOH MAINTAINING 0.75 BPM RETURNS. 18:30 - 20:30 2.00 CEMT P RUNPRD POOH MAINTAINING 0.75 BPM RETURNS. MEANWHILE SUCCESSFULLY PRESSURE-TEST BTT DBPV'S FOR CLEAN-OUT RUN. 20:30 - 20:40 0.17 CEMT P RUNPRD HOLD PJSM BEFORE LAYING DOWN BHA#12. 20:40 - 21:30 0.83 CEMT P RUNPRD LD BHA#12, RECOVER 5/8"STEEL BALL. NOTICE 5FT ELINE SLACK INSIDE PH6. 21:30 - 21:40 0.17 BOPSUR P OTHCMP HOLD PJSM BEFORE CONDUCTING BOP FUNCTION-TEST. 21:40 - 21:50 0.17 BOPSUR P OTHCMP CONDUCT BOP FUNCTION-TEST. OPEN/CLOSE ANNULAR,UPPER/ VARIABLES/LOWER RAMS+HCR FROM NORDIC AND FROM CTDS DRILLER'S CONSOLE. ALL FUNCTIONS WORK PROPERLY AND CLOSING TIMES ARE WITHIN 1 -2 SECONDS. 21:50 - 22:00 0.17 CONDHL P OTHCMP HOLD PJSM BEFORE MU BHA#13 (CLEAN-OUT BHA). 22:00 - 22:30 0.50 CONDHL P OTHCMP MU CLEAN-OUT BHA WITH 4.5"CLEAN-OUT MILL. 22:30 - 22:50 0.33 CONDHL P OTHCMP PERFORM PRESSURE-TEST ON QTS TO 250PSI/5MINS AND 4,300PSI/5MINS. 22:50 - 00:00 1.17 CONDHL P OTHCMP COMMENCE RIH WITH BHA#13. Printed 11/5/2012 10:21:33AM L • North America -ALASKA- BP � Page 5 of 12 O s eration Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/10/2012 End Date:8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time.6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/12/2012 00:00 - 00:50 0.83 CONDHL P OTHCMP COMPLETE RIH.DO NOT OBSERVE ANY MOTORWORK/CEMENT STRINGERS WHILE RIH. TAG TOP OF LINER(TOL)AT 8,385'.PU AND VERIFY TAG.RE-TAG TOL AT 8,383.7'AND 8,384.3'(TOL AS PER TALLY:8,383.93') 00:50 - 04:20 '3.50 CONDHL P OTHCMP START CIRCULATING 2X BOTTOMS UP AT 2.5BPM WHILE RECIPROCATING BETWEEN 8,300'AND 8,380'.NOTICED CEMENT BEING STRUNG OUT AND PH-VALUES READING HIGH AROUND"12"UNTIL—370BBLS WERE PUMPED(1X BOTTOMS UP=294BBLS). 02:O0AM-SLB CEMENTING CALLS AND CONFIRMS THAT CEMENT HAS 500PSI COMPRESSIVE STRENGTH. 04:20 - 04:30 0.17 CONDHL P OTHCMP COMPLETE CIRCULATION OF 2X BOTTOMS UP.SHUT IN PUMPS AND FLOW-CHECK i WELL. 04:30 - 06:20 1.83 CONDHL P OTHCMP POOH WITH BHA#13. 06:20 - 06:30 0.17 CONDHL -P OTHCMP PERFORM 5MIN FLOWCHECK AT SURFACE. ACHIEVE GOOD NO-FLOW. 06:30 - 06:45 0.25 CONDHL P OTHCMP POP OFF LUBRICATOR AND LD BHA#13. WHEN LAYING DOWN THE BHA, NOTICE THAT DISCONNECT, DUAL CIRCULATION VALVE AND MOTOR/MILL ARE MISSING. OAL OF FISH= 13.83'WITH 2-3/8"REG BOX LOOKING UP. 06:45 - 08:30 1.75 CONDHL N DFAL.. OTHCMP COMPLETE CREW CHANGE. DISCUSS SITUATION WITH CTD FIELD SUPT, ODE&BTT AND DEVELOP PLAN FORWARD TO RUN CUT LIP GUIDE/MOTOR&ATTEMPT TO SCREW-IN TO FISH. BEGIN BUILDING 75-BBLS 8.4-PPG 1%KCL IN PITS. 08:30 - 09:15 0.75 BOPSUR N DFAL OTHCMP HOLD PJSM&MU XOS&NOZZLE TO JET STACK. PU INJECTOR&STAB ON WELL. JET BOP STACK AT 1-BPM/280-PSI. MAKE 3 PASSES. FINISH BUILDING 75-BBLS 8.4-PPG 1%KCL. LD NOZZLE&SET INJECTOR BACK OVER CIRC HOLE. IA/OA=75-PSI/20-PSI. 09:15 - 10:15 1.00 CONDHL N DFAL OTHCMP WAIT FOR BTT TO ARRIVE. ASSESS OPTIONS FOR NEW FARR TONG POSITION ON THE RIG FLOOR&INSTALL STORAGE STAND WHILE WAITING FOR BAKER. 10:15 - 11:15 1.00 CONDHL N DFAL OTHCMP BRING BTT FISHING BHA COMPONENTS TO RIG FLOOR&HOLD PJSM ON MU FISHING BHA. MU FISHING BHA(#14). BHA CONSISTS OF: SKIRTED PIN TAP,XO,2-7/8"MOTOR,5K RUPTURE SUB, HI-LOAD DISCONNECT,JARS, DBPV,XO,2-JTS OF 2-3/8"PH6,XO, LOCKABLE SWIVEL,XO&CTC. OAL=92.53'. MU ALL CONNECTIONS USING LOCKTITE. Printed 11/5/2012 10:21.33AM ``� x -[ ,,, .. North America ALASKA BP Page 6 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type:COM-ONSHORE(CON) ' Start Date: 8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914 00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time.6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:15 - 11:35 0.33 CONDHL N DFAL OTHCMP MU BHA TO COIL&STAB INJECTOR ON WELL. TEST QTS TO 250-PSI/3500-PSI. HOLD AND CHART EACH TEST FOR 5-MIN. CIRCULATE AT.3-BPM/80-PSI. IA/OA=70-PSI/10-PSI. 11:35 - 13:00 1.42 CONDHL N DFAL OTHCMP RIH WITH FISHING BHA AT 100-FPM. -CIRCULATE AT.27-BPM/77-PSI. 13:00 - 13:15 0.25 CONDHL N DFAL OTHCMP WT CHECK AT 8334'. PU WT=29K-LBS. RIH WT AT.5-BPM/130-PSI=17K-LBS. CHECK PUMP RATE/PRESSURE: .75-BPM/ 215-PSI. 1-BPM/350-PSI. 1.5-BPM/700-PSI. REDUCE RATE TO.5-BPM/150-PSI. RIH AT 10-FPM/18.3K-LBS SET DOWN 2K-LBS AT 8372.9'AND SEE PRESSURE INCREASE TO 300-PSI. PU WITHOUT CHANGE IN PU WEIGHT OR CIRC PRESSURE AT.5-BPM. RIH AND SET DOWN 2K-LBS AT 8373.1'. PRESSURE UP IMMEDIATELY,APPEARS TO STALL. PU WT=30K-LBS. CIRC AT.5-BPM/ 800-PSI. FLOW CHECK WELL-NO FLOW. 13:15 - 15:15 2.00 CONDHL N DFAL OTHCMP LINE UP TO FILL WELL DOWN THE BACKSIDE. ESTABLISH FILL AT 1-BPM/ .6-BPM RETURNS. POH WITH FISHING BHA AT 80-FPM. 15:15 - 16:00 0.75 CONDHL N DFAL OTHCMP FLOW CHECK WELL-NO FLOW. HOLD PJSM ON HANDLING POTENTIAL FISH. DISCUSS DROPPED OBJECT POTENTIALS, BHA COMPONENTS,POSITIONS OF PEOPLE AND KEEPING RIG FLOOR CONGESTION TO A MINIMUM. UNSTAB INJECTOR AND SET BACK OVER CIRC HOLE. LD FISHING BHA AND FISH. FULL RECOVERY OF MILL,MOTOR,CIRC SUB&DISCONNECT. SKIRTED PIN TAP WELL ENGAGED IN DISCONNECT. 16:00 - 16:30 0.50 CONDHL N DFAL OTHCMP SEND OUT ALL UN-NEEDED BTT TOOLS. SEND RECOVERED DISCONNECT&CHECKS TO BE MPI'D. 16:30 - 17:00 0.50 WHSUR P OTHCMP PERFORM LEAK-TIGHT ISOLATION TEST TO CONFIRM BARRIERS FOR INSPECTING BOPE. CLOSE MASTER&SWAB. PRESSURE UP VOID BETWEEN TO 3500-PSI. NO LEAKS. CLOSE SSV. HOOK UP SENSOR TO MONITOR VOID BETWEEN SSV&SWAB. CTS CHANGE OUT INJECTOR PACKOFF. 17:00 - 21:30 4.50 BOPSUR P OTHCMP VAC OUT BOPE STACK&PERFORM INSPECTION OF BOPE. REPLACE BLADE SEALS ON BSRS,PACKER SEALS&TOP SEAL ON VBRS. Printed 11/5/2012 10.21.33AM OW 7of12 "�North America -ALASKA-BP Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date.8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914.00) Project: Prudhoe Bay Site:PB C Pad Rig Name/No.. NORDIC 1 Spud Date/Time:6/25/1979 12.00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 23:00 1.50 BOPSUR P OTHCMP PERFORMED ACCUMULATOR DRAWDOWN TEST. -STARTING ACCUMULATOR PRESSURE= 3,100 PSI -FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR=2,200 PSI -20 SEC TO BUILD 200 PSI,95 SEC TO FULL PRESSURE. -3 NITROGEN BACKUP BOTTLES WITH 2,100 PSI. FLUID PACK KILL, CHOKE STACK AND MGS. RIG UP HOSES TO CHOKE AND PERFORM FULL BODY SHELL TEST TO 250PS1/5MINS LOW AND 4,500PSI/5MINS HIGH.ACHIEVE GOOD TEST. INSTALL 2-3/8 X 3-1/2"TEST JOINT. 23:00 - 00.00 1.00 BOPSUR P OTHCMP START BOP-TEST.WITNESS OF THE BOP TEST WAS WAIVED BY BOB NOBLE(AOGCC), BUT WITNESSED BY BP WSL&NORDIC TOOLPUSHER. 23:30HRS-SLB CALLS AND CONFIRMS THAT CEMENT HAS 2,000PSI COMPRESSIVE STRENGTH. 8/13/2012 00:00 - 05:00 5.00 BOPSUR P OTHCMP CONDUCT BI-WEEKLY BOPE PRESSURE AND FUNCTION-TEST AS PER NORDIC PROCEDURE,AOGCC REGS&DWOP POLICY. INSTALL 2-3/8 X 3-1/2"TEST JOINT AND PERFORM PRESSURE-TEST TO 250PS1/ 5MINS AND 3,500PSI/5MIN ON FOLLOWING ITEMS: -ANNULAR BAG -#1 RAM-BLIND SHEARS -#2 RAM-2-3/8"COMBIS(2-3/8"TEST JOINT) -#3 RAM-2-3/8"x 3-1/2"VBR(2-3/8"TEST JOINT) -#4 RAM-2-3/8"COMBIS(2-3/8"TEST JOINT) ALL RAMS CLOSED WITHIN LESS THAN 2SECONDS.ALSO TESTED HCR AND ALL VALVES ON KILL AND CHOKE LINE AS WELL AS KILL AND CHOKE MANIFOLDS. SUCCESSFULLY TESTED ALL VISUAL AND AUDIBLE GAS ALARMS.SEE ATTACHED CHARTS. 05:00 - 06:00 1.00 BOPSUR P OTHCMP CLEAR RIGFLOOR.LIFT TEST-JOINT INTO PIPESHED. INSTALL NIGHTCAP AND FILL MGS. 06:00 - 06:15 0.25 BOPSUR P OTHCMP COMPLETE CREW CHANGE AND MAKE ROUNDS. 06:15 - 07:00 0.75 BOPSUR P OTHCMP FINISH BOPE TEST BY TESTING INNER REEL VALVE&PACKOFF. 07:00 - 07:30 0.50 WHSUR P OTHCMP OPEN UP WELL AGAINST CLOSED CHOKE. 0-PSI ON WELL. ATTEMPT TO FILL,WELL IS FULL. OPEN CHOKE&FLOW CHECK-NO FLOW. IA/OA=60-PSI/10-PSI. Printed 11/5/2012 10:21.33AM . " erwzNorth America-ALASKA- BP Page 8 of 12 Operation Summary Report Common Well Name: C-09 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914 00) Project: Prudhoe Bay Site: PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time.6/25/1979 12.00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (ft) 07:30 - 08:30 1.00 CONDHL P OTHCMP SLB MECHANIC VERIFY TORQUE OUTPUT OF LITTLE JERKS. MATCHES CERTIFICATION FROM JULY 2012 AND CONFIRMS THAT AT 2800-FTLBS ON THE GAUGE,THE UNIT IS PUTTING OUT 2980-FTLBS OF TORQUE. MECHANIC ALSO INSPECTS DAMPER VALVE ON INJECTOR. 08:30 - 14:00 5.50 CONDHL P OTHCMP MU SAFETY JOINT FOR HANDLING 1-1/4" CSH. HOLD PJSM ON MU CLEANOUT/LOGGING BHA WITH 1-1/4"CSH. DISCUSS PIPE HANDLING,REVIEW RIG SITE RISK ASSESSMENT FOR USING 1-1/4"CSH, REVIEW SOURCE HANDLING HAZARDS& MITIGATIONS,ASSIGN PEOPLE TO POSITIONS,NECESSARY BARRICADING AND COMMUNICATION. MU CLEANOUT/LOGGING BHA. BHA CONSISTS OF:2.3"MILL,2-1/8"MOTOR,XO, 2-JTS 1-1/4"CSH,XO, MCNL/GR/CCL/EPITHERMAL IN CARRIER, CIRC SUB, DISCONNECT,XO,10-JTS OF 1-1/4"CSH,3'MARKER JT,94-JTS OF 1-1/4" CSH,XO, DISCONNECT, DBPV,XO,2-JTS OF 2-3/8"PH6,XO, LOCKABLE SWIVEL,XO,CTC. OAL=3444.16'. PU 90 JTS OF 1-1/4"CSH FROM PIPE SHED. PUMP THROUGH STRING FOR EVERY 30-JTS RIH-NO ISSUES. 14:00 - 14:30 0.50 CONDHL P OTHCMP PERFORM CREW CHANGE AND HOLD PJSM ON PU 1-1/4"CSH FROM PIPE SHED. REVIEW RISK ASSESSMENT FOR USING - 1-1/4"CSH, HANDLING CONCERNS AND MITIGATIONS,ASSIGN PEOPLE TO POSITIONS AND HIGHLIGHT REPETITIVE TASK/LONG-CHANGE DAY HAZARDS. 14:30 - 16:30 2.00 CONDHL P OTHCMP CONTINUE TO RIH WITH REMAINING 18-JTS OF 1-1/4"CSH FROM PIPE SHED. HOLD KICK WHILE TRIPPING DRILL WITH RIG CREW. CREW RESPONDS QUICKLY AND IN ACCORD WITH STANDING ORDERS. DISCUSS POSITIONS PEOPLE WHEN PICKING UP SAFETY JOINT AND EMPHASIZE THAT RESPONDING QUICKLY DOES NOT MEAN YOU NEED TO PUT YOURSELF IN HARM'S WAY. FINISH MU 1-1/4"CSH,2-3/8"PH6 AND REST OF BHA. 16:30 - 17:00 0.50 CONDHL P OTHCMP PU INJECTOR&MU TO COIL. STAB ON WELL&PRESSURE TEST QTS TO 250-PSI/3500-PSI. HOLD&CHART TEST FOR 5-MINUTES. IA/OA=60-PSI/10-PSI. 17:00 - 18:00 1.00 CONDHL P OTHCMP RIH WITH LOGGING/CLEANOUT BHA AT 100-FPM. CIRCULATE AT.5-BPM/450-PSI. IA/OA=60-PSI/10-PSI. Printed 11/5/2012 10:21.33AM • North America -ALASKA- BP Page 9 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/10/2012 End Date: 8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12.00:00AM I Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 20:00 2.00 CONDHL P OTHCMP LOG DOWN FROM 8,300'TO PBTD AT 30-FPM. CIRCULATE AT 0.5-BPM%40-T'SI. INCREASE RATE TO 1.5-BPM/2,800-PSI. WHILE RIH, NOTICE SMALL AMOUNTS OF MOTORWORK AROUND 100PSI-200PSI. 111 SLACK OFF CT WEIGHT BETWEEN 11,450' AND 11,500'.AT 11,574'PICK UP TO 11,540', THEN CONTINUE WITH LOGGING. IN MM=8.55 PPG, OUT MM=8.38 PPG, IA= 82 PSI,OA=7 PSI. 20:00 - 20:50 0.83 CONDHL P OTHCMP REDUCE PUMPS TO MIN RATE AT 11,595' (300PSI CIRC PRESSURE,18K LBS CT WEIGHT).TAG TD AT 11,619.4'. LINE UP PERF PILL TO COIL.SLOWLY PICK UP AND CONTINUE PUMPING AT 1.5BPM. RECIPROCATE COIL BETWEEN 11,550'AND 11,480'AND PUMPED 38BBLS PERF PILL. 20:50 - 21:00 0.17 CONDHL P OTHCMP RE-TAG AT 11,619.5'WITH 4K LBS STACK DOWN. PU TO FLAGGING DEPTH AND PAINT FLAG (WHITE/RED)AT 11,443.6'BIT DEPTH(8,000' EOP-DEPTH). 21:00 - 22:00 1.00 CONDHL P OTHCMP CONTINUE LOGGING UP AT 60FPM.STOP PUMPING AT 8,400'AND PULL UP TO 8,300'. 22:00 - 23:10 1./7 CONDHL P OTHCMP SLB LOGGING ENGINEER CALLS AND GIVES OKAY TO POOH. 23:10 - 23:45 0.58 CONDI-IL P OTHCMP TAG SURFACE.START FLOWCHECK AND CONDUCT PJSM.ACHIEVE GOOD NO FLOW. 23:45 - 00:00 0.25 CONDHL P OTHCMP POP OFF INJECTOR AND STAND TO SIDE. 8/14/2012 00:00 - 04:00 4.00 CONDHL P OTHCMP RIG UP HANDLING EQUIPMENT. START LD BHA#15 ALL THE WAY TO MARKER JOINT,STANDING BACK 1-1/4"CSH IN DERRICK. 04:00 - 04:15 0.25 CONDHL P OTHCMP HOLD PJSM WITH SLB LOGGING ENGINEER BEFORE LD MARKER JOINT. 04:15 - 04:45 0.50 CONDHL P OTHCMP CONTINUE LD 1-1/4"CSH AND RECOVER LOGGING CARRIER TO RIGFLOOR. 04:45 - 05:00 0.25 CONDHL P OTHCMP MAKE RIGFLOOR SAFE AND REMOVE RADIO-ACTIVE SOURCE FROM SLB MEMORY LOGGING TOOL. 05:00 - 06:30 1.50 CONDHL P OTHCMP LOAD DOWN LOGGING TOOLS FOR DATA DOWNLOAD. MEANWHILE FINISH LAYING DOWN THE BHA #15. 06.30 - 07:00 0.50 CONDHL P OTHCMP PERFORM CREW CHANGE&MAKE PRE-TOUR CHECKS. Printed 11/5/2012 10:21:33AM n , North America -ALASKA-BP Page 10 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/10/2012 End Date: 8/16/2012 X3 01250(1,638,914.00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 08.15 1.25 ZONISO P OTHCMP HOLD PJSM ON TESTING LINER LAP. DISCUSS HAZARDS ASSOCIATED WITH HIGH PRESSURE TESTING,VALVE LINE-UP PER PROCEDURE,CONSIDERATIONS AROUND EXISTING WELLBORE EQUIPMENT AND ASSIGN PEOPLE TO POSITIONS. RU CHART&FLUID PACK LINES. PRESSURE TEST LINER LAP TO 250-PSI FOB 5-CHARTED MIN. GOOD FLAT LINE TEST. PRESSURE TEST LINER LAP TO 2000-PSI FQR `30-CHARTED MINUTES. GOOD TEST WITH 19-PSI LOST IN FIRST 15-MIN AND 8-PSI ON SECOND 15-MINUTES. PASSING TEST. 2.4-BBLS TO ACHIEVE FULL PRESSURE. BLED BACK 2.4-BBLS AT END OF TEST. 08:15 - 09:45 1.50 PERFOB P OTHCMP RIG CREW RE-INSTALLING GUARDS ON PIPE ELEVATOR. ADJUST VALVES&PERFORM OIL CHANGE ON GEN#1 WITH CAT MECHANIC. REPORT LINER LAP TEST RESULTS TO WTL WILLINGHAM AND HE APPROVES PROCEEDING WITH WORK. 09:45 - 10:45 1.00 PERFOB P OTHCMP HOLD PJSM ON LOADING PERF GUNS IN PIPE SHED. DISCUSS POSITIONS OF PEOPLE, DROPPED OBJECTS POTENTIALS AND MITIGATIONS,AND IMPORTANCE OF CLEAR &CONCISE COMMUNICATION. LOAD GUNS AND GUN RUNNER'S TOOLS ONTO RIG. 10:45 - 11:00 0.25 PERFOB P OTHCMP HOLD PJSM ON M/U PERF GUNS&RIH. DISCUSS POSITIONS OF PEOPLE. DROPPED OBJECTS. CROSSOVER&SAFTETY JOINTS. POTENTIAL HAZARDS AND MITIGATIONS, IMPORTANCE OF GOOD COMMUNICATION. 11:00 - 15:00 4.00 PERFOB P OTHCMP P/U 16 PERF GUNS, M/U BHA TIH F/340'-3443' MD. M/U INJECTOR HEAD,TEST LUBRICATOR SEALS(4200 PSI-5 MINS) _ 15:00 - 16:30 1.50 PERFOB P OTHCMP RIH ON COIL WITH PERF GUNS F/3443'- 11-444'MD AT FLAG.CORRECT DEPTH TO 11,442'MD(2'CORRECTION).RIH WITH GUNS TO PLUG BACK DEPTH OF 11,616'MD. MAKE 2'CORRECTION TO 11,614'MD. PULL UP TO 11,602'MD AND PREP TO RUN PUMP SCHEDULE. 16:30 - 17:15 0.75 PERFOB P OTHCMP HOLD PJSM AND OPERATION MEETING FOR FIRING SEQUENCE. MAKE DUMMY PUMP RUN TO ESTABLISH PUMP RATES. BEGIN PUMP SCHEDULE AND FIRE PERFORATING ,/GUNS PER PLAN ON DEPTH OF 11,600'MD: Q000 INDICATION OF GUNS FIRING.WELL TAKING FLUID AFTER GUNS FIRED. 17:15 - 18:30 1.25 PERFOB P OTHCMP AT 10,450'MD LOSS RATE AT 6.6 BPH. POOH SLOWLY WHILE ESTABLISHING PUMP RATE AND BACK PRESSURE. PUMP AT 65 BPM WITH 659 PSI AND 250 PSI BACK PRESSURE. WELL TAKING 0.2 BPM OR 12 BPH INITIALLY AT PULL RATE OF 38 FPM. HOLE RECOVERING AS PULLING UP HOLE. Printed 11/5/2012 10:21.33AM North America -ALASKA-BP Page 11 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date: 8/10/2012 End Date:8/16/2012 X3-01250(1,638,914.00) Project:Prudhoe Bay Site: PB C Pad Rig Name/No.:NORDIC 1 Spud Date/Time:6/25/1979 12:00:00AM Rig Release: 8/16/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:00 0.50 PERFOB P OTHCMP PULL UP TO LINER LAP AND CONDUCT 30MINS FLOWCHECK AT 8,357'.ACHIEVE GOOD NO-FLOW. 19:00 - 20:15 1.25 PERFOB P OTHCMP CONTINUE POOH AT 75FPM AND PUMPING AT 1.3BPM MAINTAINING-150PSI BACKPRESSURE ON THE TUBING WITH THE CHOKE.PVT=277 BBLS. 20:15 - 20:45 0.50 PERFOB P OTHCMP -PULL TO SURFACE.PERFORM 30MINS FLOWCHECK AND ACHIEVE GOOD NO-FLOW. PVT=249 BBLS. MEANWHILE HOLD PJSM AND REVIEW THE ADW DEVIATION WITH THE CREWS BEFORE STANDING BACK THE 1-1/4"CSH. 20:45 - 23:00 2.25 PERFOB P OTHCMP COMMENCESTANDING BACK 1-1/4"CSH, FILLING UP THE WELL REGULARLY. 23:00 - 23:10 0.17 PERFOB P OTHCMP ***"CONDUCT KICK WHILE TRIPPING**** WHEN PULLING 1-1/4"CSH,THE DRILLER FUNCTIONED THE HORN UPON WHICH THE CREW INSTALLED THE 1-1/4"CSH x 2-3/8"STL X-OVER AND MADE UP THE SAFETY JOINT MEANWHILE THE MOTORMAN WHO WAS WORKING IN THE DERRICK CAME DOWN TO MAN THE KOOMEY.THE SAFETY JIONT WAS LOWERED ACROSS THE BOP AND THE 2-3/8" COMBI'S WERE SIMULATED TO BE CLOSED. THEREAFTER,THE TIW-VALVE WAS CLOSED WITH THE KEY AND LAST THE HCR WAS SHUT. THE CREW KNEW EXACTLY WHAT HAD TO BE DONE AND THE WELL WAS MADE SAFE WITHIN 2:30 MIN:SEC. 23:10 - 00:00 0.83 PERFOB P OTHCMP CONTINUE STANDING BACK CSH WHILE _FILLING UP THE HOLE REGULARLY. 8/15/2012 00:00 - 00:45 0.75 PERFOB P OTHCMP CONTINUE STANDING BACK 1-1/4"CSH DOWN TO THREE JOINTS ABOVE THE MARKER JOINT. 00:45 - 01:00 0.25 PERFOB P OTHCMP HOLD PTM WITH SLB PERFORATORS BEFORE LAYING DOWN SPENT PERF GUNS. 01:00 - 02:30 1.50 PERFOB P OTHCMP FILLED UP WELL WITH 3BBLS;ALTOGETHER WELL DRANK 18BBLS WHILE POOH AND LD BHA.THIS EQUATES TO A LOSS-RATE OF -2BBLS/HR. RIG UP HANDLING EQUIPMENT BEFORE LAYING DOWN PERFORATION GUNS INTO THE PIPESHED. 02:30 - 03:45 1.25 RIGD P POST DONE WITH LAYING DOWN THE PERF GUNS. CLEAR RIGFLOOR AND LOAD OUT SLB HANDLING EQUIPMENT. MEANWHILE HOLD PJSM WITH LITTLE RED SERVICES FOR RIGGING UP THE DIESEL SURFACE LINE AND PRESSURE-TESTING SAME. 03:45 - 04:30 0.75 RIGD P POST PERFORM PRESSURE-TEST ON LITTLE RED SURFACE LINES TO 250PSI/5MINS AND 3,500PSI/5MINS.ACHIEVE GOOD TEST, BLEED OFF. MEANWHILE START MU BHA#17 (FREEZE-PROTECT BHA)AND STAB ON INJECTOR. Printed 11/5/2012 10:21:33AM : North America -ALASKA- BP Page 12 of 12 Operation Summary Report Common Well Name:C-09 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/10/2012 End Date 8/16/2012 X3-01250(1,638,914 00) Project:Prudhoe Bay Site:PB C Pad Rig Name/No.: NORDIC 1 Spud Date/Time:6/25/1979 12.00.00AM Rig Release: 8/16/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum:Kelly Bushing/Rotary Table @62.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 04:45 0.25 RIGD P POST HOLD PJSM BEFORE RIH AND FREEZE-PROTECTING WELL. MEANWHILE PERFORM PRESSURE-TEST ON QTS TO 300PSI/5MINS AND 4,500PSI/5MINS. ACHIEVE GOOD TEST AND BLEED DOWN. 04:45 - 06:30 1.75 RIGD P POST RIH AT 45FPM WITH BHA#17.PUMPING AT 2.5BPM WITH CIRC PRESSURE OF 1,700PSI. RUN TO 2,500FT AND PUMP AWAY 97BBLS DIESEL INTO COIL. ONCE DIESEL EXITS NOZZLE,POOH WHILE LAYING IN DIESEL FREEZE PROTECT. 06:30 - 07:30 1.00 RIGD P POST SET INJECTOR IN BUNG HOLE AND CLEAR OF DIESEL TO CUTTINGS BOX.CLEAR AND CLEAN FLOOR. 07:30 - 11:30 4.00 RIGD P POST GREASE TREE.RIG UP LUBRICATOR AND TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH-PASS.RIH AND SET TYPE"J"BPV.RIG DOWN AND LAY DOW LUBRICATOR.FILL TREE WITH MEOH SHUT IN SWAB AND SSV AND TEST. 11:30 - 13:00 1.50 RIGD P POST PJSM.CUT 775-FT OF COIL. 13:00 - 14:00 1.00 RIGD P POST PUMP SLACK MANAGMENT AND CUT 275-FT OF COIL. 14:00 - 14:30 0.50 RIGD P POST MAKE UP COIL CONNECTOR. 14:30 - 15:00 0.50 RIGD P POST UNLOAD CUT COIL SECTIONS FROM RIG AS WELL AS CROSS OVERS AND TOOLS FOR BAKER. 15:00 - 16:30 1.50 RIGD P POST SUCK OUT PITS. LOTO ACCUMULATOR. BLOW DOWN CHOKE AND KILL LINES.SUCK OUT STACK. 16:30 - 20:30 4.00 RIGD P POST INSPECT TOT BOP DOORS AND ELEMENTS. 20:30 - 23:00 2.50 RIGD P POST HOLD PJSM BEFORE NIPPLING DOWN BOPS. 23:00 - 00:00 1.00 RIGD P POST INSTALL TREE CAP AND PRESSURE-TEST TO 300PSI/5MINS AND 3,500PSI/5MINS- ACHIEVE GOOD TEST. AS PITS ARE EMPTY,CUTTINGS BOX DISCONNECTED,TREE CAP INSTALLED,RIG IS RELEASED AT 00:00. 8/16/2012 00:00 - 03:15 3.25 RIGD P POST PREPARE RIG FOR MOVING OFF WELL. 03:15 - 03:30 0.25 RIGD P POST HOLD PJSM BEFORE MOVING THE RIG. 03:30 - 04:00 0.50 RIGD P POST START MOVING RIG FROM WELL C-09 TO C-03. Printed 11/5/2012 10:21.33AM C-09B, Well History (Post Rig Sidetrack) Date Summary 08/16/12 T/I/0=0/100/0 Conduct PJSM. Barriers= MV& SSV. Verified by applying 500 psi against SSV through tree cap. LTT Passed; Conduct Post CTD Torque&Test for Nordic 1. 08/28/12 ASRC Test Unit#4. NKWO with CTD on C-Pad. Inlet C-09, Outlet C-33, S/B for DSO, RDMO. 08/29/12 ASRC Test Unit#4. *NKWO with CTD on C-Pad. Inlet C-09, Outlet C-33, S/B for Profile, R/U. 08/30/12 CTU#9 w/1.75" CT Scope: N2 Lift. Complete RU Initial WHP 0 psi. Begin displacing CT to N2 at 1000 scf/m taking returns to ASRC and down C-33 flowline. RIH w/2"JSN pumping N2 at 500 scf/m making frequent lifting stops. Pumped 247kscf of N2 to kickoff well.Well flowing to ASRC. Begin RD. 08/31/12 ASRC Test Unit#4. *NWKO with CTD on C-Pad. Inlet C-09, Outlet C-33, Flow Well Start 12 Hr Well Test. 09/01/12 ASRC Test Unit#4. NWKO on C-Pad. Inlet C-09, Outlet C-33, Flow Well. Completed 12 HR Test. Begin RD. 09/02/12 RC Test Unit#4. NWKO on C-Pad. Inlet C-09, Outlet C-33, RDMO. 10/23/12 MIRU SWCP 4518 TO SET WFD LINER TOP PACKER. 10/24/12 SET 7"WFD LTP @ 8371'MD. SET 5-1/2"LTTP IN 7"WFD LTP 8355'SLM LRS PERFORMS _ PASSING MIT-T TO 2000 psi. CURRENTLY HAVE TO SWAP UNITS FROM 4518 TO DC-5 DUE TO MECHANICAL ISSUES. 10/24/12 T/I/O=2300/128/0 Temp=Sl Assist slickline w/Load&test, MIT-T to 2000 PSI PASSED per SLB WSL, Pumped 5 bbls MEOH &330 bbls diesel to load TBG. Pumped an additional 12.9 bbls AMB DSL to test. 1st 15 min TBGP gained 25&2nd 15 min TBGP gained 66 for a total TBGP gain of 91 in 30 min. (Thermal). Bled back—6 bbls. FWHP's=259/114/0 DSO notified upon departure SLB still on well&in control of all VLV's. 10/25/12 PULLED 5-1/2" LTTP FROM 7"WFD LTP @ 8345'SLM (8355' MD). Page 1 of 1 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB C Pad C-09 - Slot 09 C-09BPB1 Survey: MWD Survey Report - Geographic 27 August, 2012 Mini BAKER ebc HUGHES Survey Report-Geographic t owe' bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Well: C-09 North Reference: True Wellbore: C-09BPB1 Survey Calculation Method: Minimum Curvature Design: C-09BPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PBC Pad,TR-11-14 Site Position: Northing: 5,957,218.72ft Latitude: 70°17'22.367 N From: Map Easting: 662,550.03ft Longitude: 148°41'2.797 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well C-09 API No 500292036600 Well Position +N/-S 0.00 ft Northing: 5,960,329.00 ft Latitude: 70°17'52.611 N +E/-W 0.00 ft Easting: 664,145.00ft Longitude: 148°40'14.351 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 33.00ft Wellbore C-09BPB1 API No 500292036670 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 8/1/2012 20.89 81.04 57,655 Design C-09BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,300.00 Vertical Section: Depth From(TVD) +NI-5 +E/-W Direction (ft) (ft) (ft) (°) 29.50 0.00 0.00 177.25 Survey Program Date: 8/8/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(C-09) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,310.00 11,195.00 MWD(C-09BPB1) MWD MWD-Standard 8/27/2012 7:54:31AM Page 2 COMPASS 2003.16 Build 73 BAKER °'a, HUGHES Survey Report-Geographic INTEQf p� Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Well: C-09 North Reference: True Wellbore: C-09BPB1 Survey Calculation Method: Minimum Curvature Design: C-09BPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,300.00 21.13 177.61 8,628.45 -2,631.78 765.76 5,957,714.76 664,968.01 70° 17'26.727 N 148°39'52.037 W TIP 9,310.00 21.09 177.62 8,637.78 -2,635.38 765.91 5,957,711.16 664,968.23 70° 17'26.692 N 148°39'52.033 W KOP 9,341.43 24.23 174.44 8,666.78 -2,647.45 766.77 5,957,699.11 664,969.36 70° 17'26.573 N 148°39'52.007 W 9,370.22 27.80 168.72 8,692.66 -2,659.92 768.66 5,957,686.69 664,971.52 70° 17'26.450 N 148°39'51.953 W 9,400.11 31.90 165.72 8,718.58 -2,674.42 771.97 5,957,672.27 664,975.15 70° 17'26.308 N 148°39'51.856 W 9,430.77 34.91 162.97 8,744.17 -2,690.66 776.54 5,957,656.13 664,980.07 70° 17'26.148 N 148°39'51.723 W 9,460.31 37.13 160.82 8,768.06 -2,707.17 781.95 5,957,639.75 664,985.83 70° 17'25.985 N 148°39'51.566 W 9,490.59 39.56 153.66 8,791.82 -2,724.45 789.23 5,957,622.63 664,993.49 70° 17'25.815 N 148°39'51.353 W 9,522.91 42.43 150.98 8,816.21 -2,743.21 799.09 5,957,604.08 665,003.76 70° 17'25.631 N 148°39'51.066 W 9,550.66 45.30 153.08 8,836.22 -2,760.20 808.10 5,957,587.30 665,013.13 70° 17'25.464 N 148°39'50.804 W 9,583.93 48.94 154.70 8,858.86 -2,782.09 818.82 5,957,565.65 665,024.33 70° 17'25.249 N 148°39'50.491 W 9,612.37 52.24 155.72 8,876.91 -2,802.04 828.03 5,957,545.91 665,033.97 70° 17'25.052 N 148°39'50.223 W 9,647.43 55.89 157.40 8,897.48 -2,828.08 839.31 5,957,520.12 665,045.81 70° 17'24.796 N 148°39'49.894 W 9,693.53 61.99 158.55 8,921.26 -2,864.67 854.10 5,957,483.86 665,061.40 70° 17'24.436 N 148°39'49.464 W 9,723.13 66.53 162.16 8,934.11 -2,889.78 863.04 5,957,458.96 665,070.89 70° 17'24.189 N 148°39'49.203 W 9,749.47 68.74 165.30 8,944.14 -2,913.16 869.86 5,957,435.74 665,078.22 70° 17'23.959 N 148°39'49.004 W 9,777.69 70.35 167.37 8,954.00 -2,938.85 876.10 5,957,410.19 665,085.02 70° 17'23.707 N 148°39'48.823 W 9,810.31 72.32 171.91 8,964.44 -2,969.24 881.65 5,957,379.93 665,091.23 70° 17'23.408 N 148°39'48.661 W 9,845.61 73.82 175.44 8,974.73 -3,002.80 885.37 5,957,346.47 665,095.68 70° 17'23.078 N 148°39'48.553 W 9,870.17 73.85 178.66 8,981.56 -3,026.35 886.58 5,957,322.95 665,097.40 70° 17'22.846 N 148°39'48.518 W 9,900.54 74.52 183.91 8,989.85 -3,055.55 885.92 5,957,293.74 665,097.38 70° 17'22.559 N 148°39'48.537 W 9,930.59 72.69 187.75 8,998.33 -3,084.22 883.00 5,957,265.01 665,095.09 70° 17'22.277 N 148°39'48.622 W 9,960.52 72.44 190.73 9,007.30 -3,112.40 878.42 5,957,236.74 665,091.12 70° 17'22.000 N 148°39'48.756 W 9,990.65 73.88 195.26 9,016.03 -3,140.49 871.93 5,957,208.52 665,085.25 70° 17'21.724 N 148°39'48.945 W 10,029.99 76.10 200.97 9,026.23 -3,176.59 860.11 5,957,172.18 665,074.22 70° 17'21.369 N 148°39'49.289 W 10,049.22 77.34 202.28 9,030.65 -3,193.98 853.21 5,957,154.64 665,067.71 70° 17'21.198 N 148°39'49.490 W 10,081.72 82.67 201.46 9,036.29 -3,223.68 841.30 5,957,124.69 665,056.44 70° 17'20.906 N 148°39'49.838 W 10,110.31 87.79 204.62 9,038.66 -3,249.88 830.15 5,957,098.25 665,045.87 70° 17'20.648 N 148°39'50.163 W 10,140.41 88.65 209.30 9,039.60 -3,276.69 816.51 5,957,071.15 665,032.83 70° 17'20.384 N 148°39'50.560 W 10,170.72 87.85 213.63 9,040.52 -3,302.52 800.70 5,957,044.98 665,017.59 70° 17'20.130 N 148°39'51.021 W 10,200.11 86.53 216.13 9,041.96 -3,326.60 783.92 5,957,020.54 665,001.33 70° 17' 19.893 N 148°39'51.510 W, 10,230.77 87.82 213.85 9,043.48 -3,351.69 766.36 5,956,995.08 664,984.33 70° 17' 19.647 N 148°39'52.022 W1 10,260.67 90.52 211.63 9,043.91 -3,376.83 750.19 5,956,969.59 664,968.71 70° 17' 19.399 N 148°39'52.493 W 1 10,290.67 92.09 208.22 9,043.23 -3,402.82 735.23 5,956,943.29 664,954.33 70°17'19.144 N 148°39'52.929 W 10,320.53 93.78 205.95 9,041.70 -3,429.37 721.66 5,956,916.45 664,941.33 70° 17'18.883 N 148°39'53.324 W 10,350.52 94.02 203.00 9,039.66 -3,456.60 709.26 5,956,888.96 664,929.54 70° 17'18.615 N 148°39'53.686 W 10,378.81 93.01 205.60 9,037.92 -3,482.33 697.64 5,956,862.98 664,918.48 70° 17' 18.362 N 148°39'54.024 W 10,410.61 91.66 209.19 9,036.63 -3,510.53 683.03 5,956,834.46 664,904.49 70° 17' 18.084 N 148°39'54.450 W 10,440.74 90.40 211.91 9,036.08 -3,536.47 667.72 5,956,808.20 664,889.75 70° 17' 17.829 N 148°39'54.896 W 10,470.77 90.77 214.22 9,035.78 -3,561.64 651.33 5,956,782.68 664,873.92 70° 17' 17.582 N 148°39'55.374 W 10,501.09 90.31 217.84 9,035.49 -3,586.15 633.50 5,956,757.79 664,856.63 70° 17' 17.341 N 148°39'55.893 W 10,530.73 89.36 221.28 9,035.58 -3,609.00 614.63 5,956,734.54 664,838.26 70° 17'17.116 N 148°39'56.443 W 10,564.75 89.32 225.93 9,035.97 -3,633.63 591.17 5,956,709.40 664,815.35 70° 17' 16.874 N 148°39'57.127 W 10,594.85 90.21 228.69 9,036.09 -3,654.03 569.05 5,956,688.52 664,793.68 70° 17' 16.673 N 148°39'57.771 W 10,630.91 89.94 230.15 9,036.05 -3,677.49 541.66 5,956,664.47 664,766.82 70° 17'16.443 N 148°39'58.569 W 10,676.82 92.30 223.91 9,035.15 -3,708.76 508.10 5,956,632.48 664,733.94 70° 17'16.135 N 148°39'59.547 W I 10,700.88 92.98 221.43 9,034.04 -3,726.43 491.81 5,956,614.46 664,718.04 70° 17'15.961 N 148°40'0.022 WI 10,732.59 91.84 217.66 9,032.71 -3,750.85 471.64 5,956,589.60 664,698.42 70° 17' 15.721 N 148°40'0.610 W' 10,761.70 91.20 213.83 9,031.93 -3,774.47 454.64 5,956,565.62 664,681.94 70° 17' 15.489 N 148°40'1.105 W 10,798.47 89.78 210.80 9,031.62 -3,805.54 434.99 5,956,534.14 664,662.97 70° 17' 15.183 N 148°40'1.677 W 10,830.79 86.35 207.12 9,032.71 -3,833.79 419.36 5,956,505.55 664,647.96 70° 17' 14.905 N 148°40'2.133 W 10,860.87 88.16 204.63 9,034.15 -3,860.82 406.25 5,956,478.24 664,635.44 70° 17'14.640 N 148°40'2.515 W 10,890.87 88.19 204.95 9,035.11 -3,888.04 393.67 5,956,450.75 664,623.47 70°17'14.372 N 148°40'2.881 W 8/27/2012 7:54:31AM Page 3 COMPASS 2003.16 Build 73 BAKER HUGHES Survey Report-Geographic A - oi' offy INTEQ e; Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Well: C-09 North Reference: True Wellbore: C-09BPB1 Survey Calculation Method: Minimum Curvature Design: C-09BPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,920.91 88.40 208.19 9,036.00 -3,914.89 380.24 5,956,423.62 664,610.63 70°17'14.108 N 148°40'3.273 W 10,950.91 87.94 213.20 9,036.96 -3,940.67 364.94 5,956,397.51 664,595.90 70°17'13.854 N 148°40'3.718 W 10,981.22 90.40 214.75 9,037.40 -3,965.80 348.01 5,956,372.02 664,579.52 70° 17'13.607 N 148°40'4.212 W 11,010.68 90.55 217.92 9,037.15 -3,989.53 330.56 5,956,347.92 664,562.59 70°17'13.374 N 148°40'4.720 W 11,043.10 90.83 220.60 9,036.76 -4,014.63 310.04 5,956,322.38 664,542.63 70°17'13.127 N 148°40'5.318 W 11,070.74 92.86 222.91 9,035.87 -4,035.23 291.65 5,956,301.38 664,524.69 70°17'12.924 N 148°40'5.854 W 11,097.96 93.91 227.40 9,034.26 -4,054.39 272.39 5,956,281.81 664,505.85 70° 17'12.736 N 148°40'6.415 W 11,131.95 93.22 230.99 9,032.15 -4,076.56 246.71 5,956,259.09 664,480.67 70°17'12.518 N 148°40'7.163 W 11,195.00 93.22 230.99 9,028.61 -4,116.18 197.80 5,956,218.41 664,432.64 70°17'12.128 N 148°40'8.588 W TD 8/27/2012 7:54:31AM Page 4 COMPASS 2003.16 Build 73 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB C Pad C-09 - Slot 09 C-09B Survey: MWD Survey Report - Geographic 27 August, 2012 ,,r rail BAKER °o'a-0 HUGHES Survey Report-Geographic .'iii INTEQ "Ax"' Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Well: C-09 North Reference: True Wellbore: C-09B Survey Calculation Method: Minimum Curvature Design: C-09B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PBC Pad,TR-11-14 Site Position: Northing: 5,957,218.72ft Latitude: 70°17'22.367 N From: Map Easting: 662,550.03ft Longitude: 148°41'2.797 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well C-09 API No 500292036600 Well Position +N/-S 0.00 ft Northing: 5,960,329.00 ft Latitude: 70°17'52.611 N' +El-W 0.00 ft Easting: 664,145.00 ft Longitude: 148°40'14.351 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 33.00ft Wellbore C-09B API No 500292036602 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2011 8/1/2012 20.89 81.04 57,655 Design C-09B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,920.91 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 29.50 0.00 0.00 181.73 Survey Program Date: 8/27/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(C-09) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,310.00 10,920.91 MWD(C-09BPB1) MWD MWD-Standard 10,922.00 11,653.00 MWD(C-09B) MWD MWD-Standard 8/27/2012 8:02:53AM Page 2 COMPASS 2003.16 Build 73 Mill BAKER g°4,00" HUGHES Survey Report-Geographic •‘:,,,,„,,,,- : at:' INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.50ft(NABORS Well: C-09 North Reference: True Wellbore: C-09B Survey Calculation Method: Minimum Curvature Design: C-09B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,920.91 88.40 208.19 9,036.00 -3,914.89 380.24 5,956,423.62 664,610.63 70° 17'14.108 N 148°40'3.273 W TIP 10,922.00 88.38 208.37 9,036.03 -3,915.85 379.73 5,956,422.65 664,610.14 70°17'14.098 N 148°40'3.288 W KOP l 10,951.37 91.88 204.32 9,035.96 -3,942.16 366.70 5,956,396.06 664,597.69 70°17'13.840 N 148°40'3.667 W' 10,985.95 89.97 197.28 9,035.40 -3,974.46 354.43 5,956,363.50 664,586.13 70°17'13.522 N 148°40'4.025 W 11,019.27 90.18 199.83 9,035.36 -4,006.05 343.83 5,956,331.69 664,576.22 70°17'13.211 N 148°40'4.334 W 11,053.65 88.55 208.44 9,035.74 -4,037.39 329.79 5,956,300.05 664,562.86 70°17'12.903 N 148°40'4.743 W' 11,091.45 89.11 212.54 9,036.51 -4,069.95 310.61 5,956,267.09 664,544.41 70°17'12.583 N 148°40'5.302 W 11,119.29 91.78 218.30 9,036.30 -4,092.63 294.49 5,956,244.07 664,528.78 70° 17'12.360 N 148°40'5.771 W 11,152.80 93.20 219.92 9,034.84 -4,118.60 273.37 5,956,217.64 664,508.24 70°17'12.104 N 148°40'6.387 W i 11,175.97 92.85 223.52 9,033.62 -4,135.87 257.98 5,956,200.04 664,493.23 70° 17'11.935 N 148°40'6.835 W 11,206.15 91.44 226.40 9,032.49 -4,157.21 236.67 5,956,178.24 664,472.39 70°17'11.725 N 148°40'7.456 W 11,244.55 88.71 232.19 9,032.44 -4,182.24 207.57 5,956,152.59 664,443.85 70°17'11.479 N 148°40'8.304 W 11,274.46 87.85 235.57 9,033.34 -4,199.86 183.43 5,956,134.44 664,420.10 70° 17'11.305 N 148°40'9.007 W 11,305.13 88.99 241.03 9,034.18 -4,215.96 157.35 5,956,117.77 664,394.38 70°17'11.147 N 148°40'9.767 W 11,336.73 88.74 237.27 9,034.81 -4,232.16 130.23 5,956,100.99 664,367.63 70°17'10.988 N 148°40'10.557 W I 11,372.34 91.20 232.70 9,034.83 -4,252.58 101.08 5,956,079.93 664,338.93 70°17'10.787 N 148°40'11.406 WI 11,406.08 89.32 227.70 9,034.67 -4,274.17 75.17 5,956,057.78 664,313.49 70°17'10.574 N 148°40'12.161 W I 11,442.90 88.19 227.43 9,035.47 -4,299.01 48.00 5,956,032.36 664,286.88 70°17'10.330 N 148°40'12.953 W 11,470.44 87.23 229.28 9,036.58 -4,317.30 27.44 5,956,013.63 664,266.72 70°17'10.150 N 148°40'13.552 W 11,506.15 90.22 235.98 9,037.37 -4,338.95 -0.92 5,955,991.37 664,238.85 70°17'9.937 N 148°40'14.378 W 11,534.77 89.29 239.38 9,037.49 -4,354.25 -25.10 5,955,975.54 664,215.01 70°17'9.787 N 148°40'15.082 W i 11,565.50 90.52 243.38 9,037.54 -4,368.97 -52.07 5,955,960.24 664,188.37 70°17'9.642 N 148°40'15.868 W 11,604.79 92.21 248.91 9,036.61 -4,384.85 -87.98 5,955,943.58 664,152.82 70°17'9.486 N 148°40'16.914 W 11,653.00 92.21 248.91 9,034.75 -4,402.18 -132.92 5,955,925.27 664,108.26 70° 17'9.315 N 148°40'18.224 W TD Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,660.00 2,659.92 13 3/8" 13.375 17.500 9,007.00 8,356.51 9 5/8" 9.625 12.250 Survey Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (ft) (ft) (ft) (ft) Comment 10,920.91 9,036.00 -3,914.89 380.24 TIP 10,922.00 9,036.03 -3,915.85 379.73 KOP 11,653.00 9,034.75 -4,402.18 -132.92 TD Checked By: Approved By: Date: 8/27/2012 8:02:53AM Page 3 COMPASS 2003.16 Build 73 Letter of Transmittal EMI2J ).\ - c00 Date: ECEIVED BAKER October 2, 2012 OCT 12 2012 HUGHES AOGCC To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94`h Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson a3-1 vI. Please find enclosed the directional survey data for the following well(s): — C-09BPB 1 C-09B 2, (d ' 0 Le 0' C-03CPB 1 C-03C — a / -005--52 - C-24BPB 1 C-24B 1 — 014.)- B-27B (?,_" 13 07-22A - )._—05 -- S-37APB1 S-37A - ? ) 2\ cp o i l -- S-32A , ) , ® 8.2._ - S-12B (A , ( ( ( Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 . 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of t is data. / - RECEIVED BY: /7) , State of Alaska AOGCC DATE: (,=:') l] B_' • ''k---' Li,' itiraASEA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU C-09B BP Exploration (Alaska), Inc. Permit No: 212-060 Surface Location: 885' FNL, 1223' FEL, SEC. 19, T11N, R14E, UM Bottomhole Location: 30' FNL, 1382' FEL, SEC. 30, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, ') y /°1-4e,,,,./—c--, Cathy/P. Foerster Chair DATED thiseday of May, 2012. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALAS, )IL AND GAS CONSERVATION COMM DN Mik.r 0 3 20i2 PERMIT TO DRILL 20 AAC 25.005 � 1 a.Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Willi ®Single Zone 1 c. Speci t i well "��pcpd'�ed for: ❑ Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska)Inc. Bond No. 6194193' PBU C-09B • 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11650' ' ND 8955'ss ' Prudhoe Bay/Prudhoe Bay 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 0283058 28310 ' 885' FNL, 1223'FEL,Sec. 19,T11 N, R14E, UM. Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3696' FNL,480'FEL, Sec. 19,T11 N, R14E, UM July 10,2012 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 30' FNL, 1382' FEL, Sec.30,T11 N, R14E, UM 2560 26300' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 62.50' • feet 15.Distance to Nearest Well Open Surface: x- 664145 • y-59603294 Zone- ASP4 GL Elevation above MSL: 32.58' feet to Same Pool: 500' 16.Deviated Wells: Kickoff Depth: 9325' • feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 92 degrees Downhole: 3219 • Surface: 2339 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/2'x3-1/4'x2-7/8" 9 3#/6 6*/6 Ste L-80 STL/TC-II 3265' 8385' 7716'ss 11650' 8955'ss 194 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 10560' 9042' 10100',9740' 10520' 9045' None • Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20" 12.9 cu vds Permafrost Concrete 110' 110' Surface 2660' 13-3/8" 4147 cu ft Arctic Set II 2660' 2660' Intermediate _ 9007' 9-5/8" 1227 cu ft Class'G'. 130 cu ft AS 9007' 8357' Production Liner _ 1108' 7" 396 Cu ft Class'G' 8487'-9595' 7873'-8905' Liner 2173' 3-1/2"x 3-3/16"x 2-7/8" 79 Cu ft Class'G' 8387'-10560' 7780'-9042' Perforation Depth MD(ft): 9692'- 10450' Perforation Depth ND(ft): 8983'-9038' 20.Attachments: 0 Property Plat ® BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Matt Ross,564-5782 Printed Name John McMullen Title Engineering Team Leader Ail tam 2 bSs -C-,,r TC HA/ AA . Prepared By Name/Number Signature /2-7,„1...%,,,„--7 . Phone 564-4711 Date 6/3h2._ Joe Lastufka,564-4091 Commission Use Only Permit To Drill T API Number: Permit Approv Date: See cover letter for Number: /u)t,t 50-029-20366-02-00' S kiS 12-- other requirements Conditions of cApproval:s If box is checked,well?may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: 131 [� / Other: •n 3IS( No P 7�51 Samples Req'd: 0 Yes 13/NO Mud Log Req'd: ❑yes L`9 No H2S Measures: [+] Yes 0 No Directional Survey Req'd: aYes 0 No APPROVED BY T Date O -B -12._ HE P COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of appr ial(20 AAC 25.005(g)) mit In Duplicate ORInihi A i ,z_ S-7_,Z . _���L To: Alaska Oil & Gas Conservation Commission From: Matthew Ross bp CTD Engineer Date: May 3, 2012 Re: C-09B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well C-09A. CTD Drill and Complete C-09B program: Rig Start Date: July 10th, 2012 • Pre-Rig Work: (scheduled to begin June 15th, 2012) 1. E Set 3-3/16" CIBP at —9,500' MD using CCL to locate mid joint, & PT to 2,000 psi. 2. E Chemical cut 3-3/16" tubing at 9,355' (free point at 9,370' MD). 3. C Pull test 3-3/16" liner with 4" GS Spear. Freeze protect well to 2,000' MD. 4. V PT MV, SV, WV. 5. 0 Bleed wellhead, production, flow, and GL lines down to zero and blind flange. 6. 0 Remove wellhouse, level pad. 312-111 Rig Work: (scheduled to begin July 10th, 2012) pt 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. RIH above deployment sleeve, swap well to 1% 8.4 ppg KCI. 3. Pull 3-3/16" liner stub (-963') from 8,387' MD. 4. Dummy WS Drift to 9,355'. 5. Set 4-%" x 7" TT whipstock at 9,325' MD.(Tag stump, PU 1-2' and set). 6. Mill 3.80" window at 9.325' and 10' of rathole. Swap the well to PowerVis. 7. Drill Build/Lateral: 4.25" OH, 2,325' (12 deg/100 planned) with resistivity. 8. Run open hole caliper log for swell packer analysis. 9. Run 3-1/2" x 3-1/4" x 2-7/8" L-80 liner leaving TOL at 8,385' MD. 10. Pump primary cement leaving TOC at 8,750' MD, 40 bbls of 15.8 ppg liner cmt planned. Nth 11. Perform liner cleanout with mill, motor and MCNL/GR/CCL log. (71) 12. Test liner lap to 2,400 psi. 13. Perforate liner per asset instructions (-200'). 242---°6° 14. Freeze protect well to 2500' ND. 15. Set BPV, RDMO. • Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. • 2. Set liner top packer if needed with slickline & test to 2,400psi. 3. Test separator. Mud Program: • Well kill: 8.4 ppg brine. ' • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (716 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: 4.25" From 9,325' MD to 11,650' MD . Liner Program: • 3-1/2", 9.3 lb/ft, L-80, STL liner 8,385' MD—8,415' MD. • 3-1/4", 6.6 lb/ft, L-80, TC-II Solid liner 8,415' MD — 10,500' MD. • 2-7/8", 6.5 lb/ft, L-80, STL Solid liner 10,500' MD — 11,650' MD. • A minimum of 40 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 8,750' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 92.03°, inclination at kick off point is 21°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—26,300'. • • Distance to nearest well within pool —500' from C-25B. Logging 99 9 • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Open hole caliper log will be run should hole conditions warrant from 9,325' MD to 10,400' MD. • Cased hole GR/CCUMCNL logs will be run. • Perforating: • SWS 2", 6 spf, perf guns, 1-1/a" CSH work string, & 2-3/8" PH6 • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • C-23 653.92' (ctr— ctr distance) Fails at 11,475' MD. Status: Parent Wellbore, plugged and abandoned. • C-23A 654.6' (ctr— ctr distance) Fails at 11,475' MD. Status: Plugged and abandoned. • C-25B 459.54' (ctr— ctr distance) Fails at 10,133' MD. Status: Producer. Hazards • C-Pad is considered an H2S pad. Well C-33A had 38 ppm H2S on 4/06/2011. • • Most recent H2S level on C-09A is 22 ppm recorded on 6/7/2011. • The lost circulation risk in the C-09B is considered to be low and 1 fault crossing is planned.• Reservoir Pressure • The reservoir pressure on C-09B is expected to be 3,219 psi at 8,800' TVDSS. (7.1 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,339 psi. • An EMW of 8.4 ppg for this well will provide 624 psi over-balance to the reservoir. • Matthew Ross CC: Well File CTD Engineer Sondra Stewman/Terrie Hubble a Z 5 O o Z > CO , CO COs- V Q Q r _r_ o coO co o ZZ m cco f� N N 4 Ch co O O O N N , Lr) M O � to � O (N F... N N � � 0) CO COo °o O (0 0) .q. ii, , 0_ CD a) a s 2 c II O � � • a 0 C ) i T a) ' N �O 0 m o )° U a) 0 O m m c Z a) O a .. U < J FY 15 O 0 u) tD N O > U m m = ' ccn> 0) y 9 - >. T m 2 C 0) 0) 0 m 7 'O T.) Ti.) = E O a) m E m = a) o Y Y f- LU 2 D a FPT= c p y > J J C) C m '0 a) y p '0 c U C .. rn m e O-0 to' c dL. J J U a' C C m 0 m F- C m 0 R N 0 m c 0 7 9 O c .- 0 N m 0 .. m O w y m U y C LL O C U ce a) ns m ro) o o rt, ce .c as dm 2y N- 0 0 0) ` O �, o " Cn J H rL Z fn 0 N O 0 O a= 0 O N O O 0 r N O O (0 CO O) O 0) Co N v CO Cl ). c•) .- m N o v a) CC CD Co C ._ ° `° a 0) )O> c 9. -2 ID 0 m = O 4 E' c O 0 O o a�CL ' al 7 d ,_ i= W o N rn m o) v w a cn r c re m ° c No a y c c m O O )0 - L .- L r Z W U) o W cp C°e 2 0 U 0 m 0 + co z Q J QN CO m O 4 W N N O ig m n H 9 r4 a 7 O- m H 4 CC N d i E 0 IP UD V O) CA d m c6 Z O LL ' N m � ( 0 ,_ O x s= = « o 0 0 m T n Z CC a] N Q O coO— O O O co m �Q -p O O m O J o m0 a o u) E 2 m zc� Q c c Q o m 8 •- m 2 a c 0 o o Z 0 m -' ' d m N N ma n 0 0 . m a m ie 2 w La Urn Om) c in Q 1 �' + + . O 2 m o 9 m c c z a- a U U a r c IPI''' r) N m c m 1�pl S d E o C o c y ") :W0 C .. N c I •0 C .y C m V O C O 4' d GV[AS . 2 rn •V• y ON d «O-. d ° 47, 2 c w Z C N m (- o ,« m m a ••O A aa)) W 1 r a..) E •O m m .O m 10 m 7 m m ,: 2 Z Ua 'rns s o a 2 02 m LI) U. a a E O. Q > > _ co O 6) O O (O O O IN O CO N O O NN N a (I) (/) O co O O r O CO O N O r CO O O V r CC CC O (O O O M O co O r a M O r' O O r co co N M N N A- (O � U) r r r r CO ),,4,),, CO CO V a `u Z Z COc **0 ri LL v 8 pq O O i- O (O (O N N (N/ C/) /C/�O�CO NC,)N M CO O CO l0 0) CO O M O CO UO r CO Cf)©© a- W (D N N v 0 C) N— co r- (O (O co CO N 1-- a 0 o v r v N ao .tir` N cd r o ao ao N (O co r W CO CO CO r c0 r (D CO r Z 0 . _ () v_ v v v LO LO CO (D r r co co a) o 0 co co 2 0 (N N N (N N N N N N N N N N M M M 0 2 2 -o ; co cC C O 6) o o Q 0C CC d O o U 7) co (r Z Z o 0 0 0 0 0 0 0 0 0 0 0 0 0 CD O C C 7 Q O V o O O O O O O O O O O O CD O L L UO o 6) N N N N N N N N N N N N N o > u) E co U CO CO 7 Co — T T N ._ 2 J O Y Y H E ❑ _ W 0°-- y CO O CO N M N UO (D N CO O CO (V r () ,� O (O N N N CO V (C) 6) co c!') CO V C O N O Q) M o r (O O 6) O CD W `7 M N o d) ":0:151:°:: CD co co r r CO 6) O co O co co o CA 6) 6) (A 6) 6) CO 0) 0 CO O O O O O O o w - V - - l0 V 6- (O c0 (O l0 (O l0 .y V co co (O CO (o (O CD (0 C0 CO (D CO CD (O CD CO C o (O co co (O CO (D CO CO CO CO CO CO CO O CO (0 d O L reW ci C d tl 0 N a V (0) C 7 7 C C N U E o co co 6 r M (O co (O N a N co o a (D ` r ID o r N- coM O co(O O coM coM O M N V (O CO O .��, d N U N T sC (O a0 tO N CO co r N M (O r o O (� d `C- Q' T N CO m O Q) r (O N (O CO N r CO r co co O co ,= N .0 C r r (o CO CD CO (O At a M N N ' o 0) 0) o > o m rO rn LO (rO (rO (rO (rO (rO 0O 0O (i i LO �i 0 0 O CO m 0) 0 0 0) CO rn rn 01 0) 0) 0) co 0) co m Z CO O C CO -c Z (n (ri (n (n ui (n (n (n (n (ri ((� U) 6 u� ui t Oc 03 O0. •. (n (n CO V O N N TY o O M N r O N N co 47 ❑ r (O (O W O 7 0 0) r O O C0 (c) (O (O (O O (O N N O O Ni r r C� CO CD CO r r W O O) 6) 6) O O N CO 6) 0 ,,. ..<. r r r r r r r r r r CO CO CO oO r r 15 H ( w o ..; U CO CO W O O CO M N r CO c0 CO 0 (O CO CI- O r r CD A- 6) r to O CO CO CO N Co 07 CO m o cd v 6 Lc) eo (u oo a v o r (o E >- co r Cr) cor _i V 4 ) N r CO r CD CO (O CO 13A(O (DCO (o CO CO CO r r CO o 0 o O N CO M CO Z ❑ Z N N N N N N N N N N M M ch M M M Cl o O 6 co CO CO N () r o N (0 CO 6) (O UO (O (O 63 o N W O NO CO V (O CO 0 M 6) N 9 U) 6) N N (O O coCO CO V N V N C `7 R (J (o co o (O 6) r— (O CO o CO MLO CO r r 0) (n CC) CO CO CO IN CO CO CO 0) 0) 0) O) C) CO 6) = > = E i- 2 (r (n co 6) N V <t c0 V' CO O O r O N (n CO CO N CO ,t (O M N O © CO CO A- r O N 0 r r W CO (0 M N (D (O (o r m O O co r r r CD (D CD r W CO IN CO CO IN CO 6) O .0 Cm .- A- A- e- .- A- A- 1- .— ,— ,— s— N CO7 Q CCO N (n o N �U CO N 0 d Q U)C N _ _ _ J N 7 co co o 6 CO 6) co V N O r r r Q Cl) ,— a- o M l0 (O co co CO (O N 6) CD CO N (O G) o O N co co Q) O CD O CO r O 4 CO CO (p RS O O N N N O N M M (O CO CO NIN r CO CO CO CO U T o (O V�. J NCO a Off"^, co co_ Co O Q O a.co ~ m ,- O O r -0Urn600) C E o E m m 0 0 co o Z a. a. U U a O o 0 > 0 0 0 0 o O o O o 0 0 0 o O o O o Q o O O O O O o o O O O 0 O 0 0 0 O (^') 111 Ift O. o o 0 ( n OO r 0 0 o n o o 0 0 0 0 0 o 0Z W _ M �.eg= O E - co 7 co co a co ,a V -a (O (O r r M 6) 6) o .- N N \1y10 5. ` F O 6) N O of d 6i O 6i C rn rn m o o o Oi o o o 0 0 0 0 ��'� R C T LL d E._ F Y W V in co ,_ ,_ s_ r- C. N O a= " a. a rn CI C gta co N Z 0aN3 o Co a Q _ CO C) N NY CO O CO IN a) O O) O CID CO C) O O CD I� �..., CO CO O CO CO O O CO N O N O O — C) O — N O O O a CK LC7 V v Cn Ci C) O) O CO CO O O o O O O O — O 0 co co co op co co a0 a) a) C) C) a) C) C) al CD C) CD CD .c- D mm CO mo Co Z• Z LL H 6 C0 0 00 N N C/) CO CO CO CD M V N- O IN C) C) CO CO CO N CD CO O CO ' CO C) Cn CL O CO CO M V CO IN CO r N O (O CO CO O CO O) a (U (U V V CO CO O M N CO CO CD V N O) CO N M N N N CO CO M CO O O) CO Q) CO N N. CO O CO (D I' CO V CO 1 1 I C.) N CO CO CO CD CO IN CO CO O O O O .- N N CO CO 0 CllF h M M M M M M M M C M M M 0 a V vi Nr - o t_ C6 03 CD 0 N O O ct c d o — � CO U co Z O O O O O 0 0 C) 0 O 0 0 O O O O 0 0 C) O C C) 7 < O O O O C) O O C) O O C) O O O O O O O O O C C LL 0 . N N N N N N N N N N N N N N N N N N N N O) N u) o ,- ,- ,_ ,_ ,_ ,_ c- r r = r r r r r r ,c- 0 U m c° o Y zruY H �W Q .1.-.. q) N- IN CO CO a) a) O CO CO a) N O) CO O CO o .d V- N CO L- IN O CO CO O) CO N N CO V r CO O O O) C o N 4 O N4 N a) CO 0 V O N- O r 0 CD N 4 CO 22 .0N CO CO O CO CO Q) CD CO O V. a) C) M m 1-1 O O) C) CO co r N. CD (0 CO CO CO a a CO N L- — '— O 0 E ''V CO CD CO COO C CD COCD CO D CD CO CD CD CO CD CD CD CD CD OD C W CD CD CD CO CD CD CO (D CD CO CD CD CD CO CO CD CD CO CD OD I: .. W ai c a) m v C.)) 0)) CC , o a) co a) CCD N N N- CO O (D CD O V' CO ' N N- N 9 i ` Rr (O N CO d) CO CO CO CO O (O N O CD O L- O) M o w d co 0 4.,_ CC r O � CD IN IN: CC CD CO <0 CO N- CO N IN 0 N- N • d � Ce T co C1 m L- LO V" CO O L- O N Cb V IN Cr) N r O N MCD IX ° L N .0 C CO CO IN r CO CO CO CO V CO CO N N N r- — O O a) m ✓ Q r 2 :° L (D 0 0 CO CO CO CO (D O 0 0 O CD CD O (D 0 (D CO co- o p p Ca — co CO CO CO CO CO CO CO to CO CO CO LO (n CO CO CO CO CO CO J F rL Z !n Q rn C) C) rn C) C) C) CD C) C) CD CD CD m CT) CD 0) rn rn rn Z Cri Cri Cri CO Cri cc; Cri Cri Cri Cri Cri Cn Cri co" co- CO 6 CO 6 CO 0 Q IN O) O) CO CO CO N- CO IN CO O a CO CO N CO N M CO 1- C) V CO CO — CO IN CO r r CO CO Lch .- L- a) I� Ct N N h CA Q) CO O I- N C') CO M to CO — C) N r O N us CO O) O CO r M N CO CO N CCD r (O W 1- d' O Lct N CD CO CD CO d' CO CO CO N c- 7 W I— O U O co O CO a) co CO a) O N C) N- CD CO O C7 r M CL I. r CO O) CO a) O (D O r V CO O Co O a) d. [Q r M N CO N O N O) N I` N O Q) O O V Cll NC N a) O CO M N CO C) C) O) CO O O CO (N N O C) N CS Lt CCD CO CO CD r CO CO m a) CD O N CO CO CO NC CO (/) V M M M CO- M C M M M M C7 a a vf VCL z — CO N CD CO CO N O I. V O M m O CO O) CO CO N- CO (D CO M O) CO O CO C) CO h CO N- O M N CO N. . CO CO CO M O CD M M O a) O7 CO LU LU (O O CO CO V L IN N. C C r CD CO CO CO CO CO CO CO CO CD C) CO CO CO CCD N rn OD CD rn OD CD OD CT) OD CD CT) CD OD CT) CD CD CD CD CT) CD CO CO co- 00 a0 CO CO W W W Co W 47 CO CD CO tD W CD Cfi CC a I— N- N IN r CO CO CO CO O) CD O O) O O) CD O C) CO CO O) C) CO O N N N O CO N- r CO M M CO CO IN r r O N 4 O CO M O O CD N V CO 4 N O 6 O N CO N CO CO N O O N CO Lcr V CO N O N N N N N N N N N N N N N N N N N N N N N N ay CO Q 1 CO J CO N I- W CO CO CO N CO CO CO N CO CO IN V CA IN CO V Q OD COCO IN m O O O O CO CO CO V' Cr V NC M M 0 OD ON N N O O O O O O6 O O O O Ca m a) CD CD O QCD OD a) ) rn CD rn CD rn CD rn CT) CD OD rn C) T C5 m Q o d L r CO 0 .L -oUrnrn c 0 o 2 co O O m O Z00000 T 0 0 0 0 O O o 0 O O 0 0 0 O O o 0 0 0 0 10 y 0 0 0 0 O O O O O 0 0 0 0 O O o 0 0 o O (,) O 0 0 0 0 0 0 0 o CCD 0 0 0 0 0 0 0 0 0 0 N. W 4°1 Z o O O O O O O v O O C) O O O O) O O CO C`�') I'�= 7 CO V LC) CC) CO IN CO CO C) O) O N M v_ a CO CO CO (5 `WO C .. d Q O O O O O O O O O O O N ,— ,— ' Q O �iD C6 �+ p C p 2 o Q) F N .1_ w dy _ a o C O m ['� p 2 .d+ 0 d y co N Z vau) � � 0 a H o ii 8 * v M S(ib f • �5Q$7J �q 0 FI 2. of ;‘‘,s'•,--.N1111111111 — , ,... .. MIL -4 Els-92 p 1 .21.4,.n u Oyuy w -- - 8 88 a ii,. . , , _, , ,- a� ir § ,, ., ma$g I F - y 00 - s ,, , a N a3 03 01 c a F / I ci U U m �A me; tJi mcr, v I $ ( �..i w B ia b d 8 8 F w o 8 e m �. wa m 0 3 P y .2 r. g - I = c TIE Ho m N ~g P r Q N . a #o � : § s.c-Nx;sEg 9 1104 v � aUU G I r �_� vz Y$o$88$$$Rg888 / QN38� elm oo a ri��� ill A 4 VI! o. lE ; Y� r 010 <R 4e 1 F / 1 n c a m l2mooMg,'°$SWER n gS4mr'�SSBeS^ 8 C�{m fP f8 r 4 4 ',, N w., �8.mvmoc�47.i a� ‘ ja Q fp, 2: ,n2, ss4g 9 ID gssss o 3a FF.N.�".,."o^moi - ul'0 o a8$888$ $$$000 - ,,, 22mmR88S m � m W a3 8 a a m i 30 a. h�Nt�1RN{OnmOl ��r (u?/8 S9)tp.daU Ieo9 A am" BAKER `'4° HUGHES Travelling Cylinder Report 1 i by 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well C-09-Slot 09 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB C Pad MD Reference: Kelly Bushing/Rotary Table @ 62.500(NABORS 3S) Site Error: 0.00ft North Reference: True Reference Well: C-09 Survey Calculation Method: Minimum Curvature Well Error: 0.000 Output errors are at 1.00 sigma Reference Wellbore C-09B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 1 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB C Pad C-01 -C-01 -C-01 Out of range C-01 -C-01A-C-01A 9,309.15 10,059.00 1,124.45 420.47 878.12 Pass-Major Risk C-06-C-06-C-06 11,550.00 10,375.00 985.97 722.87 263.11 Pass-Major Risk C-06-C-06A-C-06A 11,550.00 10,400.00 1,197.92 702.26 496.42 Pass-Major Risk C-06-C-06APB1 -C-06APB1 11,116.05 10,025.00 1,010.78 435.09 591.12 Pass-Major Risk C-06-C-06B-C-06B 11,100.00 10,000.00 1,053.39 446.73 623.92 Pass-Major Risk C-09-C-09-C-09 9,349.98 9,350.00 0.52 4.60 -3.05 FAIL-Major Risk C-09-C-09A-C-09A 9,349.98 9,350.00 0.52 4.43 -2.88 FAIL-Major Risk C-10-C-10-C-10 Out of range C-10-C-10A-C-10A Out of range C-10-C-10B-C-10B Out of range C-11 -C-11 -C-11 Out of range C-11 -C-11 A-C-11A 9,333.71 10,645.00 1,304.66 617.07 837.64 Pass-Major Risk C-11 -C-11 A-C-11 A wp05 Out of range C-12-C-12-C-12 Out of range C-12-C-12A-C-12A Out of range C-12-C-12APB1 -C-12APB1 Out of range C-12-C-12B-C-12B Out of range C-12-C-12C-Plan 4 Out of range C-22-C-22-C-22 Out of range C-23-C-23-C-23 11,475.00 10,325.00 653.92 809.85 -134.26 FAIL-Major Risk $' C-23-C-23A-C-23A 11,475.00 10,150.00 654.60 783.23 -121.97 FAIL-Major Risk C-23-C-23B-C-23B 11,325.00 9,900.00 896.01 501.17 404.04 Pass-Major Risk C-23-C-23B-C-23B wp04 11,325.00 9,900.00 890.46 504.02 396.02 Pass-Major Risk C-23-C-23C-C-23C 11,325.00 9,900.00 896.01 501.17 404.04 Pass-Major Risk C-23-C-23C-Plan#3 11,325.00 9,900.00 896.01 501.18 404.03 Pass-Major Risk C-25-C-25-C-25 Out of range C-25-C-25A-C-25A 10,839.07 11,150.00 690.89 527.74 167.24 Pass-Major Risk C-25-C-25B-C-25B . 10,133.86 11,125.00 459.54 633.19 -169.32 FAIL-Major Risk r C-30-C-30-C-30 Out of range C-30-C-30A-C-30A 9,500.00 11,060.00 736.82 443.89 330.41 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 5/2/2012 11:18:23AM Page 3 of 35 COMPASS 2003.16 Build 73 0 U e > o mom AV. pule P4G;WPFXMQ2WW 40 3mF-4= w 8mmz F5 g99993935_S- .88$$88$ $ 9t 5 3k> SA 3 J; k'q8PmnNm . agRNW OOri$ H3 _n§ ;_ �Z P $ UMXm - m R rga 9 043 $$ U5 uuuuuuuuouu umu 0 _1S Gm m 3222 22222MVA3Su31U Eb >�aY Um "zw tft+4441414f144 f 444414 t 14 f 44 i f 41 f i t 111 f 4444 ML!r15w � 9N_o1 g- mmm '7nnm� e'.S, �i$6°amg S .i -.. E9 al 4 Y ao gy U� 0 gq1 1 $$gaV gam gam gam ga$ $g4 qa2!U v u $1�$5 a a'"u m J J P Ji 34 . O A tJ t�t�S�I S�3�S u u J J 1 1 U J 9 9 S,4 -S S!3 3 C �'.'� �'Bi�"�.ae$Pmon'nn c Arg u‘ 3 JJJ5J5 555-Pr� 3i ry nom 4114ftf1141444MUVUOUOVOUDOODI14t44f444414t11+$It411t111+11 P, wi €A &7,M2225, 22222 g MP 8 f 28C$8$88$$$88.88 i 48 ho ? m m g 0 0 0 g f- 0 ~ #1:; N`o0om U a Cw co O z z� gk 0sAwa ON o b� i db.I I I I I I I I I I OW.mUd h -.Et. d o �LL N ZU c E nn� C c�� N - U 0 m 11111.1 i I a0i 53 I I I I I I I al ) U O 00#1, 1. .ci, .likk St JJJJ 1\11 m4 � ° g \ s oam Q 2m E— a _vg ^ sten3cstCTUa ) .0 A C cv CI ID m • 0 . . OO - - U- N V N N I 4 * .. 1 L.: t.: 8 a f _ 8 1 LLa E E 4 9 II ' _ gc 11 F V " I I u o rr'I!! O U ', ..,4— 1 ■ . —■1 I f r --C — E 1111 El git-114- d - 1 o a J ll V — a` Di T, i i ~ O G U ¢ /4y d , �i DI t — 1 in o i 0 lui a m ii : I1 II O III —I 1 110 uu_ n ZnI d Q c I c c F 1111 '+ 1ff111 1111 u 151 > I �E4 c I II Z 1 $ V i O 7 > I _ Q 011111 IF 1 dTo J 881 o �' i , o � D •I 21 W J F 3 " U kir I L6 U V • • • III, 3 [VII 1=� 11= II II ci . N . 1 _ �11� a a1 W IX I i IJJ 0 I I • uo. i i• U.., >,,,v4 I 1 ir Il r . 1 I a'1— .-••• pilL,..=. al 1 : , N i 1 F3 U1 1 1 I Z I z ®o,,,8 e,:,gee , I • 1 A • I II t • II j 111 w I ,.I ,184 111111 O 0 I d Ili I1 Fy _ ... I 1111V 11 c o 1 I. i 4I I Z 0 o 4 (6) I e nn iil 1 8 [ 11=111110 a 1 . TREE= 6-3/8"OCT WELLHEAD= OCT SA NOTES: ACTUATOR= OTIS C.09A KB.ELEV= 62.48' BF.ELEV= 33.7' KOP= 2800' Max Angle= 97 @ 10560' 20"CONDUCTOR H 110' MO 1982' —7"SSSV OTIS LANDING NIP,ID=5.962" Datum MD= 9550' Datum TVD= 8800'SS 2601' —9-5/8"DV PKR I 13-3/8"CSG,72#,L-80 BTRS,ID=12.347" -1 2660' Minimum ID =2.377" @ 9693' 3-3/16" X 2-7/8" XO iH 8387' —13-1/2"BKR DEPLOY SLV,ID=3.00" ' i 8396' —3-1/2"HES XN NIP,ID=2.75" 7"TBG,26#,L-80 AB-IJ-4S,.0383 bpf,ID=6.276" -8400' 8406' -17"PBR ASSY,ID=? 3-1/2"LNR,8.81#,L-80 STL,.0076 bpf,ID=2.992" H 8427' I . % i J 8427' —3-1/2"X 3-3/16"XO,ID=2.786" S 8429' 1-19-5/8"X 7"GUIB PKR,ID=3.833" I / 8430' —I 7"X 4-1/2"XO, ID=3.958" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,ID=3.958" 8461' CHEM CUT TBG(05/03/02) ti TOP OF 7"LNR — 8487' 1-11 111 9-5/8"CSG,47#,L-80 BTRS, ID=8.681" — 9007' I-4 , 1 9533' —I 7"MARKER JOINT I 1 MILLOUT WINDOW(C-09A) 9594' -9603' TOP OF WHIPSTOCK(05/03/02) 9593' 9693' 3-3/16"X 2-7/8"XO,ID=2.377" PBTD 9865' v- 1......vv9740' H WRP(11/19/11) 1111.111 1//1. 11/ 7"LNR,29#,L-80 BTRS,.0371 bpf,ID=6.184" 9910' 1114 1111 111.41111 • 1111).11 10100' —2.23"W FD CIB P 1.1.4.1.1.1.41.1.1 1T1w1y1�1�111 Itt 4 �� (12/13/08) PERFORATION SUMMARY .1.1.1.1.1.1.1.1. REF LOG: MCNL ON 05/13!021/ ANGLE AT TOP PERF: 53°@ 9695' 3-3/16"LNR,6.2#,L-80 TCII, —I 9693' Note:Refer to Production DB for historical perf data .0076 bpf,ID=2.80" , SIZE SPF INTERVAL Opn/Sqz DATE PBTD 10525' -Nii' 1.56" 4 9692-9702 0 11/18/11 2" 6 9835-9895 0 06/17/06 2-7/8"LNR,6.16#,L-80 STL, —I 10560' 2" 6 9958-9983 0 12/14/08 2" 4 10152-10450 C 05/14/02 .0055 bpf, ID=2.38" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/79 ? ORIGINAL COMPLETION 12/12/08 RLM/PJC DRAWING CORRECTIONS WELL: C-09A 05/14/02 N3S CTD SIDETRACK 01/12/09 RMH/SV SET CIBP/ADI UtF(12/13/08) PERMIT No: 2020940 09/14/03 CMO/TLP REF LOG ADDITION 12/16/11 SRD/PJC WRP/PERFS(11/18-19/11) API No: 50-029-20366-01 06/17/06 DAV/PJC PERFORATIONS SEC 19,T11 N,R14E,886'SNL&1223'WEL 04/29/07 JLJ/TLH 3-1/2"XXN PLUG SET(04/19/07) 05/12/07 BSE/PAG PULL 3-1/2"XXN PLUG @ 8396' BP Exploration(Alaska) TREE= 6-3/8"OCT WELLHEAD= OCT _O SA NOTES: ACTUATOR= OTIS 9 B KB.ELEV= 62.48' proposed CTD sidetrack BF.ELEV= 33.7' KOP= 2800' Max Angle= )7 @ 10560' 20"CONDUCTOR H 110' 1982' H7"SSSV OTIS LANDING NIP, ID=5.962" Datum MD= 9550' O Datum TVD= 8800'SS - 2601' H9-5/8"DV PKR 13-3/8"CSG,72#,L-80 BTRS, ID=12.347" H 2660' , Minimum ID = 2.377" @ 10500' 3-1/4" X 2-7/8" XO 22° —13-1/2"BKR DEPLOY SLV,ID=3.00" i ^'8400 73-1/2"/2"HES XN NIP, ID=2.75" 7"TBG,26#, L-80 AB-U-4S, .0383 bpf, ID=6.276" — —8400' \ 8406' H7"PBR ASSY,ID=? 3-1/2"LNR,8.81#, L-80 SIL, .0076 bpf, ID=2.992"±I ` •— - J I--I3-1/2"X 3-1/4"XO S v 8429' H 9-5/8"X 7"GUIB PKR, ID=3.833" 8430' —17"X 4-1/2"XO, ID=3.958" 4-1/2"TBG, 12.6#,L-80, .0152 bpf,ID=3.958" H 8461' \ CHEM CUT TBG(05/03/02) TOP OF 7"LNR H 8487' 111 1 Top of cement at—8750' 9-5/8"CSG,47#,L-80 BTRS, ID=8.681" H 9007' 3-1/4"x 2-7/8"XO @ 10,500' TSGR = 9,136' MD 210 \\ -z." 4-1/2"x 7"TT whipstock @ 9,325' 2-7/8"TD @ 11,650' 9533' H7"MARKER JOINT 0 3-3/16"CIBP to abandon parrs @—9,450' TOP OF WHIPSTOCK(05/03/02) I--I 9593' 9693' H3-3/16"X 2-7/8"XO,ID=2.377" MILLOUT WINDOW(C-09A) 9594' -9603' • PBTDH 9865' 111111111111111, 9740' —IWRP(11/19/11) *MOH 7"LNR,29#, L-80 BTRS, .0371 bpf, ID=6.184" — 9910' 111111���11�1111/ .../h 11 W 10100' 2.23" FD CIBP AAA..AAA.4 �/ 12/13/08 PERFORATION SUMMARY �1�1�1�1�1�1�19/ ( ) REF LOG: MCNL ON 05/13/02 lie ANGLE AT TOP PERF: 53°@ 9695' 3-3/16"LNR,6.2#,L-80 TCII, — 9693' Note: Refer to Production DB for historical pert data %.. .0076 bpf,ID=2.80" "%", SEE SPF INTERVAL Opn/Sqz DATE PBTD 10525' .44.v 1.56" 4 9692-9702 0 11/18/11 2" 6 9835-9895 O 06/17/06 2" 6 9958 9983 0 12/14/08 2-7/8"LNR,6.16#,L-80 STL, 10560' 2" 4 10152-10450 05/14/02 .0055 bpf, ID=2.38" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/12/79 ? ORIGINAL COMPLETION 12/12/08 RLM/PJC DRAWING CORRECTIONS ,-YELL: C-09B 05/14/02 N3S CTD SIDETRACK 01/12/09 RMH/SV SET GBP/ADPERF(12/13/08) PERMIT No:'1020940 09/14/03 CMO/TLP REF LOG ADDITION 12/16/11 SRD/PJC WRP/PERFS(11/18-19/11) API No: 50-029-20366-01 06/17/06 DAV/PJC PERFORATIONS proposed CTD sidetrack SEC 19,T11 N, R14E,886'SNL&1223'WEL 04/29/07 JLJ/TLH 3-1/2"XXN PLUG SET(04/19/07) 05/12/07 BSE/PAG PULL 3-112"XXN PLUG @ 8396' BP Exploration(Alaska) OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER C2?1 CHEKLIST �WELL NAME 1(. �— PTD# Z"'92 D 1/Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: r4,1pG„e‘Lii POOL: r 62// Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 TO CO m 0 a) 0- u) N N O o m E a a 0 7 O E 0) a) n o a > L V ui co 0a 0) Oc 5.0 coE 3 E O 0 -p @ a) c m d a) O) 0) 70 (C') a _ O O 0 L N O 'C d CO O a) U co co N M @O.co L-, C LQ o co J N 0 @ J 0 0 O - CO 0 3 3 (.0 (0O < T 3. w Vi N a) _ . @ S o U a o- o _I a o 3 p 0 2 0 0 W o a) m F E@ m 0 5 a) > 0Ca) C @ O L CD -7p @ >> m OM O. -ca) 0 O n a > 7 O) U O N p. O a) a 0 O) O N cocn 5 0 W p J O N > @ a a O @ O) 1- O U fl. a) a) a co @ E a 0 E _J a) 3 c m E U co C ° -o• 2 a a) >- o a @ • . m O o c 0 0) a) a) co a - c- O 0) @ w L a C 9 C N 0) a) = O m O 0 O co LU O u) a) °) a) 0 CO E 3 N 0 7 I 4) C O ,_(1) f0 Q. N (0 c N Cl) 1 a 2 C 0 a U C N >_ d C O CO N L N 0 0 0 L p O U U - CO II - 6 a (n co co 0_ 0 00 2d -0 U 3 na) cci w ai a) L =(NI n @ n >- N _ @ C N w C = .N.. m (/) N 0_ Q. 01 E L .0 N o Q N 06 O) O) 'U) .3 .a -a T E a) O) L a 0 c c @ @ O. c O) @ Q T3 CCm N d) N N N U d) 0 N C c O M @ C @ >, U C a) @ M Ca C.7 O O n@ m a) a vi T@ E N n 3 CO z a) I0 0 0 7 0 0 0 E @ N- E a) 0 a o a U a) 0 '@t D M c -c C '@t 't a a -c x L x to (0 @ a) Y Z 7 CC O 0 O 7 7 O` @ CD N OL d) @ Q N d d La cn a 0 o U co Un d F ix M a s 2 2 I O W a °' _ a N > a w 0 I- 0 U < < CO a)LOU) co co a) aa) aN) a) a) a) a) < < < < < < < Cl) a) a) a) a) < coNa) a) a) a) ai < o ai < < < a z z >- >- >- >- >- >- >- >- >- >- >- >- z z z z z z z >- >- >- >- >- z >- >- >- >- >- >- z z >- z z z I- 8 a) N W N >, 1 0 U 13o ' To E =a) ' E a) LI I >. L .N 7 Q. C L O a E a.- 0 0 a) 0 I o -2 .--3 E 3 p m O a) r) o J D o Z r. aai u) 2 O N co a > c `o a-�i 0 n U IV x N c n a) 2 !: tdII otf m o @ N cn 't c E -0 0 n T In N YO 7 O C j @ C U (n .N CC) C a p — n O N 1 cn 2 m Z L O U Z to @ 7 3 @ (n C O) L c (on 7 .6 ° 7 Q (n N a) y O) `� w _ a O C a 0 a) C @ N a D O C p m O O coN L E C a) N a > U > a n n d U C c O p O)@ Q CO E E - a C C E @ N O o c y F Y C O ajf c N Y 0) s- N L 0- 0 c C m Y o o 7 a o o c o p Ur 7 U 'n co Q a) 0 o a g a 3 0 a) 0 N > @ .47) _ow 0 Q O .@n a) N 'C C >, 0 7 -•-• ° a sc @ O Y 0 O N @ O a) @ (O (6 Q (4 . N 'p O Ca co N C - °V` E a 0 0 0 r _a o 0 0 c a) m - m Q ° Z o E E 3 0 o a) L' m 3 = 0 E d Q N C a .@+ .@+ (Q d d L L @ N "70 C (B C C N M ' L 5 2 o w o n 3 p c o T 3 c E o z m (n 0 m 3 3 a) m .. '� ° @ o a a) m n °) 0 0 a m m w o a s C @ N a > > U O 7 V N O a n 7 @ p- _, >. 42 U Zo O O c O c -o -6 > O p n a a o m o o a) o o c o 0 0 -p a) @ o rn c a a0 7 0 [1 O a @ 0 @ L C) O c d) 0 _ d) O E E E y Uo p a) N 0 Ali 023 Q U L a o a a o. a) N o. cn N n t - a) a '- - _ N @ N C (`0 E O) O .03 ,"1 :8 sc N 0 N c L -o cc ,r!,-,) p @ E@ 2 2 a) @ n u @ ,c �' _ m n @ �° o >, ' a 2 c vi a .N o a d) O O) @ a) c D_ a a N N T@ 0 N a) 3 C -O c. O' O' a) C c @ 7 E. co O U O U N a >, N I J @ 1) _ a a a 0 N L L -0 a L N in a) a) > O) L a) N 1) a) E a) .o 0 C c c 0- a a 0 a) - _ 3 2 .0 rn c o r n c ac) c F- w > ►) 7 3 0 0 0 0 0 E 0 70 0 0@@ _ -00 °? '- :? a) , a m@ ° c 0 @ a@ c c c c 0 0 0 0 o U N a) o o @ a@ c- E a) c w - a CO a 0 '- U 0 O o o .5 5 @ @ -- -- a O o a 7 U > > 3 m 7 7 dai �' w w °) 3 a�'i r 0 E o m ai----- D m c E N o• - - - a) a`) 0 E E C - 3 C 'C F F F 'N agi ai) > _ a o U E �o c m c m >, o m c 'c m a) a) l a n a a) a) @ a) - 2 0 7 2 2 2@ a@ a o = O O L o a a) a) @ E a) 0 0 �� U @za _, D55Un - ooaw05 ¢ a 0co0000 < a . OmmU5 _ 2 aocnco0 a Ln IErN M V (O CO r N 0) 0 NM CO abOO N N M A Lc.:), CNO r 0N N) O M NM MM V 0) (O r0) ''co' W U I- N N N cN N O C N N a) U C .e a) la (0 N O Ce 0 0 0 V O) 0 CI o)N O W O 0 112 c co co p'E 1, 7 J N N a) ✓) O F(/-�- J Xk p 0 c `p_ cn 0 G a 0 `'� W oIV " O c < C7 d < U)i