HomeMy WebLinkAbout186-020MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, May 22, 2024
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Kam StJohn
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
04-17
PRUDHOE BAY UNIT 04-17
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 05/22/2024
04-17
50-029-21532-00-00
186-020-0
W
SPT
8081
1860200 2020
1800 1800 1797 1800
169 372 369 365
4YRTST P
Kam StJohn
4/10/2024
AOGCC 4 Year MIT-IA
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT 04-17
Inspection Date:
Tubing
OA
Packer Depth
655 2605 2558 2543IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitKPS240410142410
BBL Pumped:4.2 BBL Returned:3
Wednesday, May 22, 2024 Page 1 of 1
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU 04-17
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
186-020
50-029-21532-00-00
9868
Conductor
Surface
Intermediate
Production
Liner
8933
86
42
9859
9576
20"
13-3/8"
9-5/8"
8660
40 - 126
38 - 9897
40 - 126
38 - 8960
9863 , 9659
470
4760
9576 , 9590
1490
6870
9444 - 9704
4-1/2"12.6# x 5-1/5" 17# TCII , L-80 36 - 9260
8537 - 8779
Structural
4-1/2" Baker , 8941 , 8081 No SSSV
8941 , 9143
8081 , 8261
Bo York
Operations Manager
Dave Wages
David.Wages@hilcorp.com
(907) 564-5006
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028324
36 - 8367
0
0
0
0
11531
11366
275
205
1657
1688
N/A
13b. Pools active after work:PRUDHOE OIL
5-1/2" BOT 3-H , 9143 , 8261
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 11:34 am, May 01, 2024
Digitally signed by Eric
Dickerman (4002)
DN: cn=Eric Dickerman (4002)
Date: 2024.04.30 15:14:28 -
08'00'
Eric Dickerman
(4002)
DSR-5/1/24
RBDMS JSB 051324
WCB 7-29-2024
ACTIVITYDATE SUMMARY
2/13/2024
*** WELL INJECTING ON ARRIVAL ***
RAN 3.68" CENTRALIZER, 8' X 1-7/8" STEM, 3.70" CENTRALIZER, 1-3/4" SAMPLE
BAILER, TAGGED STICKY PARAFFIN @ 9,648" SLM
*** WELL INJECTING ON DEPARTURE ***
2/23/2024
CT 9 1.75" Coil Tubing .156 WT. Job Scope = Drift/Log, Set IBP. Sand Dump
MIRU
***Job Continued 2/24/24***
2/24/2024
CT 9 1.75" Coil TUbing .156 WT. Job Scope = Drift/log, Set IBP, Sand dump ***Job
Continued form 2/23/24***
Finish rigging up. MU YJ MHA and HES memory gamma logging tools w/ 3.65" drift
below and JSN on the bottom. Jet across planned perf interval (9420' - 9530') and
IBP Set Depth (9590'). Log up from Tag/Fill, 9628' CTM. Paint Orange Flag @
9550'. Continue Log up to 8800'. Good Data. +43' Correction. RIH with YJ 3.5"
IBP BHA. At the flag coorelate to mid element of the IBP. Go to set depth of IBP
9590. Pump ball and allow fluids to climatize.
***Job Continued 2/25/24***
2/25/2024
CT 9 1.75" Coil TUbing .156 WT. Job Scope = Drift/log, Set IBP, Sand dump ***Job
Continued form 2/24/24***
At set depth of IBP 9590. Allow fluids to climatize. Attempted to set the plug,
pressures not cooperating. POOH to inspect. Plug is gone. Apply 2000 psi to
FlowLine between WV and Lateral Valve. RIH w/YJ 2.125" Grapple Fishing
Assembly (3.63" OD). Make several attempts to latch onto LIH IBP. No fish at
Surface. RIH w/YJ 3.5" Inflatable BP #2. AT the flag correlate to mid elemant
9599.26'. GP to set depth 9590'. Pump ball and let sitr for 3 hrs to climatize. Set plug ,
stack 5 k on plug. POOH.
LIH IBP 11.17', Coil 2" G profile. May or may not be partially inflated.
***Job Continued 2/26/24***
2/26/2024 Assist CTU: Heat upright of Fresh Water to 90*
2/26/2024
CT 9 1.75" Coil TUbing .156 WT. Job Scope = Drift/log, Set IBP, Sand dump ***Job
Continued form 2/25/24***
MU SLB 2.26" BDN. RIH. Lay in Sand on top of IBP from 9545'. 670# Carbolite
Sand. ETOS 9577' MD. Plug Set at 9590' (2/25/24). POOH Pump pipe
displacement. FP tubing from 2500' with 60/40.
***Job Complete***
2/28/2024
***WELL S/I ON ARRIVAL*** (profile modification)
D&T W/ 3.60" CENT, TEL, S-BAILER, LOC TT @ 9,247' SLM (3' corr). TAG STICKY
BOTTOM @ 9,568' MD (sample of carbolite)
***CONT WSR ON 2/29/24***
2/29/2024 ***HES 759 SLICKLINE UNIT RIG DOWN***
3/30/2024
*** WELL SHUT IN ON ARRIVAL *** (dump bail sluggets)
DRIFT W/ 3.77" GAUGE RING, TAG XN-NIP @ 9,875' SLM / 9,889' MD (+14'
correction)
MAKE 3 RUNS W/ 10' x 3.0" DUMP BAILER, DUMP BAIL 100# OF SLUGGETS
***CONT WSR ON 3/31/24***
Daily Report of Well Operations
PBU 04-17
AT the flag correlate to mid elemantg
9599.26'. GP to set depth 9590'. Pump ball and let sitr for 3 hrs to climatize. Set plug ,
stack 5 k on plug. POOH.
Daily Report of Well Operations
PBU 04-17
3/31/2024
***CONT WSR FROM 3/30/24***(dump bail sluggets)
RAN 3.65" BLIND BOX, TAG SCHMOOY HARD BTM @ 9,570' SLM / 9,584' MD
MAKE 3 RUNS W/ 10' x 3" DUMP BAILER, 1.75" K-JAR, 2.95" CENT, (150# total
sluggets dumped)
RIH 3.65" BLIND BOX TAG SCHMOOY HARD BTM @ 9,562' SLM / 9,576' MD
*** WELL SHUT IN ON DEPARTURE, DSO NOTIFIED ***
4/1/2024
***WELL S/I ON ARRIVAL*** (PERFORATE INTERVAL WITH 3 3/8'' GEO BAXIS
XDP 6 spf 60 DEG PHASE) INTERVAL - 9,444'-9,503')
RIG UP YJ ELINE.
PT PCE 300 PSI LOW /3000 PSI HIGH
RUN#1 W/CH/2.75'' GR-CCL/20' OF 3 3/8'' GEO BAXIS XDPTO PERFORATE
INTERVAL 9483'-9503' MAX OD 3 3/8'' AOL=31'
CCL TO TOP SHOT 9.3' CCL STOP DEPTH 9473.7'
RUN#2 W/CH/2.75'' GR-CCL/20' OF 3 3/8'' GEO BAXIS XDPTO PERFORATE
INTERVAL 9463'-9483' MAX OD 3 3/8'' AOL=31'
CCL TO TOP SHOT 9.3' CCL STOP DEPTH 9453.7' MD
RUN#3 W/CH/2.75'' GR-CCL/19' OF 3 3/8'' GEO BAXIS XDPTO PERFORATE
INTERVAL 9444'-9463' MAX OD 3 3/8'' AOL=31'
CCL TO TOP SHOT CCL STOP DEPTH MD
T
ALL GR-CCL PASESS CORRELATE TO DRESSER ATLAS CEMENT BOND LOG
DATED 2/16/86
JOB COMPLETE
***WELL S/I ON DEPARTURE***
4/10/2024
T/I/O = 1800/655/169 (ANN-COM) AOGCC MIT-IA ***PASSED*** Witnessed by:
Kam St John. Max applied:2600/Passing above 2300. Pumped 4.2 bbls of 150*F
DSL down IA to reach max psi of 2605. After first 15 min IA lost 47 psi @ 2558. After
second 15 min IA lost 15 psi @ 2543 psi. Bled back 3 bbls. DSO Notified upon
departure.
FWHP = 1823/1302/221
PERFORATE
INTERVAL 9444'-9463'
PERFORATE
INTERVAL 9483'-9503
@
MAKE 3 RUNS W/ 10' x 3" DUMP BAILER, 1.75" K-JAR, 2.95" CENT, (150# total
sluggets dumped)gg )
RIH 3.65" BLIND BOX TAG SCHMOOY HARD BTM @ 9,562' SLM / 9,576' MD
IBP, sluggits and adperfs are correctly shown on new WBS, below. -WCB
PERFORATE
INTERVAL 9463'-9483'
MEMORANDUM
To: Jim Regg
P.I. Supervisor I`e j'(i 41Z71ZoLU
FROM: Guy Cook
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, April 20, 2020
SUBJECT: Mechanical Integrity Tests
BP Exploration (Alaska) Inc.
0417
PRUDHOE BAY UNIT 04-17
Sre: Inspector
Reviewed By:: n
P.4 Supry irt�—
Comm
Well Name PRUDHOE BAY UNIT 04-17 API Well Number 50-029-21532-00-00 Inspector Name: Guy Cook
IBSp Num: mi[GDC200418122609 Permit Number: 186-828-0 Inspection Date: 4/18/2020
Rel Insp Nam:
Monday, April 20, 2020 Page I of I
Packer
Depth
Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 0417
Type Inj w 'TVD
8081Tubing
1275 1276 1277 - m6 '
PTD 1860200
Type Test SPT Test psi
2020 -
IA 379 2501 2478 2469 —
BBL Pumped:
4,7 BBL Returned:
4.4
OA
31
269 -
267 "
267•
Interval
4YRTST P/F
P
Notes: Job performed with ORD using a triplex pump, bleed tank and
calibrated gauges.
Monday, April 20, 2020 Page I of I
i
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: DATE: Friday,June 03,2016
Jim Regg
P.I.Supervisor q 3l]
(to SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC.
04-17
FROM: Jeff Jones PRUDHOE BAY UNIT 04-17
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry T'2--
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT 04-17 API Well Number 50-029-21532-00-00 Inspector Name: Jeff Jones
Permit Number: 186-020-0 Inspection Date: 4/23/2016
Insp Num: mitJJ160526095424
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 04-17 Type Inj W`TVD 8081 • Tubing 1182 1184 - 1190 - 1197 -
PTD 1860200 Type Test SPT Test psi 2020 - IA 476 2503 2481 2473
Interval 4YRTST P/F P '' OA 158 390 387 385
Notes: 1 well inspected,no exceptions noted. -
SCANNED DEC 2 92016
Friday,June 03,2016 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
To Jim Regg / 1 DATE:Thursday,May 31,2012
P.I.Supervisor ! ( b1/1 I('/ SUBJECT:Mechanical Integrity Tests
VVV BP EXPLORATION(ALASKA)INC
04-17
FROM: Matt Herrera PRUDHOE BAY UNIT 04-17
Petroleum Inspector
Src: Inspector
Reviewed By:+�
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT 04-17 API Well Number 50-029-21532-00-00 Inspector Name: Matt Herrera
Permit Number: 186-020-0 Inspection Date: 5/15/2012
Insp Num: mitMFH120515171807
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well; 04-17 ' Type Inj W" TVD 8081 - IA 430 2547 • 2521 2514 -
PTD 1860200 ' Type Test SPT Test psi 2020 , OA 0 - 0 0 0 -
Interval 4YRTST _ P/F P - Tubing 695 • 687 687 706 -
Notes:
SCANNED MAR 1 3 2014
Thursday,May 31,2012 Page 1 of 1
02/23/11
Schhmirergor NO. 5698
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503 -2038 Attn: Christine Shartzer
ATTN: Seth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job # Log Description Date BL Color CD
P2 -31A BCRD -00081 TEMP & X/Y CALIPER SURVEY .,,,,,0 /C /() 02/06/11 1 Ob.fj/S — 1
E -03A 8L65 -00015 SCMT �../y j -a/ 01/27/11 _"1511)42 1 1 •
04-21 BG4H -00031 PRODUCTION - PROFILE , I y 'L 02/02/11 1 = din, io. 1
04 -17 BG4H -00029 INJECTION PROFILE ;t 021.ta 01/31/11 1 .._... Z3 1
P2 -52 BCRD -00082 _ PRODUCTION PROFILE - „, ' i 02/09/11 1 6 I
11 -04A BG4H -00032 X -FLOW CHECKIIBP / ' y - O -.16- 02/06/11 1 7 6 1
W -202 BMSA -00005 ISOLATION SCANNER ' )L /D ( 01/30/11 a 1 1
^ 1 0 2/ 0 6/1 1 1 ()`1![R� 1 •
15 -26B B088 -00088 _ MCNL 7 - q- �r4)mac -
15.11C BD88.00081 MCNL � - � 01/06111 1 1
07 -09A B088 -00078 MCNL JO - / t 12/08/10 1 1 1 1
K -12B BCUE -00094 MCNL ' •
°- /41 12/23/10 1 11 1
E -358 B088.00077 MCNL _ fl) - / fn {
B -04A BAUJ -00055 MCNL r 11 /21/10 1 - • 2f. I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data 8 Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400
900 E. Benson Blvd. Anchorage, AK 99503 -2838
•
MAR .4 Z,ni
- - ('~ ® d
STATE OF ALASKA 6- -O~' ~ ~ v ~ ~ V
ALA OIL AND GAS CONSERVATION CO~SION JUN Q ~ 200$
REPORT OF SUNDRY WELL OPERATIONS
Alaska Oil & Gas Cons. Commission
1. Operations Performed: Al1Gh0i'ag2
^ Abandon ~ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: ~. Permit To Drill Number:
BP Exploration (Alaska) Inc. ^ Development ^ Exploratory ~ 186-020
3. Address: ®Service ^ Stratigraphic G. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 '° 50-029-21532-00-00
7. KB Elevation (ft): '~ 62, 9. Well Name and Numbe
PBU 04-17
8. Property Designation: 10. Field /Pool(s):
~`' ADL 028324 `~ Prudhoe Bay Field !Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 9868' feet
true vertical 8933' feet Plugs (measured) None
Effective depth: measured 9769' feet Junk (measured) 9863'
true vertical 8840' feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 120' 20" 120' 120' 1490 470
Surface 3522' 13-3/8" 3522' 3502' 3450 1950
Intermediate
Production 9855' 9-5/8" 9855' 8921' 6870 4760
Liner
~~~NEC~ JUN ~ ~ 2008
Perforation Depth MD (ft): 9610' - 9704'
Perforation Depth TVD (ft): 8691' - 8779'
4-1/2", 12.6# x 5-1/2", 17# L-80 9260'
Tubing Size (size, grade, and measured depth):
::_.
Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker Premier packer; ~ 8941 ;
9-5/8" x 5-1/2" Baker'3-H' packer 9144'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation: 11,341 (Sea Water) 100 804
Subsequent to operation: 16,515 (Sea Water) 720 738
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work:
^ Exploratory ^ Development ®Service
® Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ^ Oil ^ Gas ^ WAG ^ GINJ ®WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or wA if C.O. Exempt:
Contact Aras Worthington, 564-4102 308-122
Printed Name Terrie Hubble Title Drilling Technologist
~ O/ _ ~ ` Prepared By Name/Number:
Signature Phone 564-4628 Date ~O V't eyrie Hubble 564-4628
Form 10-404 Revised 04/2006 ' ~ ~ ~ ~ ` ~~ ~' ~ Sub 'Original Only
~ R L ~`~
Digital Well File Page 1 of 1
•
•
Well: 04-17
Well History
Well Date Summary
04-17 4/8/2008 ****WELL S/I ON ARRIVAL**** (pre rwo)
DRIFTED W/ 4.5 CENT, S. BAILER TAG XN NIPPLE 9204' SLM. (BAILER EMPTY)
(TARGET DEPTH FOR CHEM. CUT 9175' MD)
****WELL LEFT S/I TURNED OVER TO DSO UPON DEPARTURE****
04-17 4/8/2008 Grease Crew called to svc leaking swab valve. valve tech noticed SSV was not closed all the way. W/L
unit operator ordered heater to thaw tree, Grease crew will return after shift change to Svc Swab and
SSV to displace any water that might be in valve bodys. Radio number 457 / 2597
04-17 4/8/2008 svc swab for slickline
04-17 4/8/2008 svc swab for slickline
04-17 4/9/2008 T/IA/OA= 0/0/100 Temp=cold PPPOT-T (PASS) PPPOT- IC (PASS) (Pre RWO)
PPPOT-T RU 2 HP bleed tools onto THA 50 psi to 0 psi, flush void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD
test equipment, re-installed Alemite cap. Cycle and torque LDS "ET style" all functioned no problems
PPPOT-IC RU 2 HP bleed tools onto IC test void 50 psi to 0 psi. Pressured to 3500 psi for 30 minute test,
3500/ 15 minutes, 3450/ 30 minutes. Bleed IC void to 0 psi, RD test equipment re installed Alemite cap.
Cycle and torque LDS "ET style" all functioned no problems
04-17 4/10/2008 **'WELL SHUT IN UPON ARRIVAL*** INITIAL T/I/O = 0/0/0.
SET 5 1/2" HES FASDRILL PLUG AT 9175'.
***CONTINUED ON 04-11-08**'
04-17 4/10/2008 ***WELL SHUT IN UPON ARRIVAL***
INITIAL T/I/O = 0/0/0.
a SET 5-1/2" FASDRILL PLUG C~ 9175'.
***CONTINUE JOB ON 4/11/08 WSR***
04-17 4/11/2008 T/I/0=20/20/vac Temp= S/I MIT-T to 4000 psi -Job postponed (RWO prep) Pumped 16 bbls of 30*F
diesel down Tbg. Main water supply for GNI leaking at T' flange upstream of pit valve, shut job down,
RDMO. Final WHP's=30/20/vac
04-17 4/11/2008 CONTINUED FROM PREVIOUS DAY. WAIT FOR LRS TO ARRIVE AND MIT WELL BEFORE JET
CUTTING TUBING. FOUND LEAK IN FLOW LINE OUT BEYOND GROVE VALVF_ nl0-rIFIE~ nsn
AND HE REQUESTED WE RIG DOWN AND LEAVE LOCATION UNTIL REPAIRS CAN BE MADE AND
ELL LEFT SHUT-IN, NO PRESSURE TEST ON PLUG OR
MIT OF WELL COMPLETED.
04-17 4/13/2008 "*WELL SHUT IN ON ARRIVAL***
JET CUT TBG ~ 9087' W/ 4.15" SCP POWER CUTTER DEPTH CORRECTED TO TUBING TALLY AS
PER PROGRAM.
TAGGED PLUG 9175'.
***DSO NOTIFIED WELL SHUT-IN & SECURED, JOB COMPLETE***
04-17 4/13/2008 T/I/0=0/0/0 OMIT-TxIA PASSED to 4000 psi. MIT-OA PASSED to 2000 nsi. (RWO Prep) Pumped down
Tbg with 77.4 bbls diesel to reach CMIT TxIA test pressure, T/IA lost 0/50 psi in first 15 min and 0/0 psi in
second 15 min for a total loss of 0/50 psi in 30 min. Pumped down OA with 5.1 bbls of diesel to reach
MITOA test pressure. OA lost 40 psi in first 15 min and 0 psi in second 15 min for a total loss of 40 psi in
30 min. FWHP's 0/80/0
04-17 4/15/2008 T/I/0=150/140/60 Circ out. (Pre RWO) Pumped 5 bbls methanol, 967 bbls 1 % KCL, 150 bbls diesel down
Tbg taking returns up the IA to the FL of 04-16. U-Tubed TxIA for 1 hr and 45 min. FP hardline from IA of
04-17 to FL of 04-16 with 7 bbls of diesel. Bled all pressures to 0 psi. FWHP's= 0/0/0 (Annulus casing
valves tagged & left open to guages)
04-17 4/17/2008 T/I/O =VAC/0/0 Set 5 1/8" FMC ISA BPV pre rig
04-17 4/18/2008 T/I/0=vac/0/0; Pull 5-1/8" FMC ISA BPV thru tree for 4ES; 1-2' ext. used, tagged C~ 84"; ***Complete***
(Best/Worthamj
04-17 4/19/2008 T/I/0= 0/0/0; Pull 5-1 /8" FMC ISA BPV thru stack; RK6=19.00; 3-5' ext. used, tagged C~ 84", no
centralizer used; ***Complete*** (BesUWortham)
Print Date: 6/4/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 6/4/2008
BP EXPLORATION Page 1 of 4
Operations Summary Report
Legal Well Name: 04-17
Common Well Name: 04-17 Spud Date: 1/28/1986
Event Name: WORKOVER Start: 4/17/2008 End: 4/27/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 4/24/2008
Rig Name: NABORS 4ES Rig Number:
Date I From - To I Hours I Task I Code I NPT I Phase
Description of Operations
4/17/2008 16:00 - 00:00 8.00 RIGD P PRE PJSM. Rig down rig components, scope down and lay over
derrick. Moved rig carrier and pit module from DS 11 to DS 04.
Laid Herculite.
4/18/2008 00:00 - 06:00 6.00 RIGU P PRE Continued moving rig components from DS 11 to DS 04 and
rigging up on 04-17. Spotted rig modules. Rig carrier and fluid
pit module on DS 04 at 00:00 hrs. Remainder of rig and camp
on DS 04 at 03:00 hrs. Waited about 2 hrs on Central Power
representative so rig could pass beneath power line behind
FS2. Bermed rig and RU mud lines. RiYgaccepted C«? 06:00.
06:00 - 07:00 1.00 KILL P DECOMP Service rig, check PVT system, inspect derrick, OK.
07:00 - 09:00 2.00 KILL P DECOMP PJSM. Pick up lubricator, pressure test to 500 psi. OK, pull
BPV. Check pressures, tubing, I/A & O/A all reading zero. L/D
lubricator.
09:00 - 12:00 3.00 KILL P DECOMP PJSM. Take on 450 bbls seawater. Line up and circulate the
well bore @ 6 bpm / 850 psi, taking returns thru the choke, thru
the micro motion meter and to the tiger tank. Circulated 590
bbls total monitor well no ressure an here.
12:00 - 15:30 3.50 WHSUR P DECOMP PJSM. Set TWC valve, test from below C~ 1000 psi against
casin / 10 minutes OK,, N/D tree and adapter flange.
15:30 - 18:00 2.50 BOPSU P DECOMP PJSM. N/U BOPE.
18:00 - 22:30 4.50 BOPSU P DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. Continued NU BOPE. Replaced kill
line HCR. RU test equipment.
22:30 - 00:00 1.50 BOPSU P DECOMP Held PJSM. Attempted to test BOPE. Had leak in kill line at
90 de bend.
4/19/2008 00:00 - 01:00 1.00 BOPSU P DECOMP Removed 90 deg bend from kill line, reinstalled same.
01:00 - 07:00 6.00 BOPSU P DECOMP Tested BOPE to 250 psi low / 4000 psi high. Tested annular to
250 psi ow psi ig ested VBR with 3-1/2" and 5-1/2"
test joints. BOPE test witness waived by R. Noble, AOGCC on
4/18/2008. Tested Kelly, upper and lower valves. Rig down test
equipment.
07:00 - 10:00 3.00 PULL P DECOMP PJSM. P/U landing joint, M/U x over, pull & lay down blanking
plug. P/U lubricator and extension, pressure test ~ 500 psi`
OK. Pull BPV, (several attempts to pull), OK.
10:00 - 11:00 1.00 PULL P DECOMP PJSM. M/U double spear assembly on (1) jt of 3 1/2" DP.
BOLDS. Engage spear, pull hanger to floor. Hanger came free
Cam? 170K, up wt leveled off at 165K. L/D spear assembly.
11:00 - 15:00 4.00 PULL P DECOMP PJSM. POOH w/ 5 1/2" AB modified 8 round tbg and dual
encapsulated control line. Recovered (4) bands and (28)
clamps. Large 4" diameter hole noted in pup it directily above .
15:00 - 16:30 1.50 PULL P DECOMP Clear /clean rig floor, rig down spooling equipment.
16:30 - 18:00 1.50 PULL P DECOMP Continued POH and LD 5-1/2" AB-Mod 8rd tubing.
18:00 - 00:00 6.00 PULL P DECOMP Held crew change and performed pre-tour checks of PVT
system and derrick. Continued POH and LD 5-1/2" AB-Mod
8rd tubing. Tubing below SSSV was covered with oil and
greasy sludge. Filled well with calculated seawater fill-up.
Recovered total of 4 ss bands, 28 clamps, 217 jts 5-1/2" tubing,
and 10.96' cut piece. Photos of cut end on S-Drive.
4/20/2008 00:00 - 02:30 2.50 CLEAN P DECOMP Cleared and cleaned rig floor. RD tubing handling equipment.
RU to handle 3-1/2" drill pipe.
02:30 - 04:30 2.00 CLEAN P DECOMP PU dress-off BHA #1: shoe, 3 x washpipe, mill, triple connect,
boot baskets, 9-5/8" scraper, and 6 x 4-3/4" DC.
Printed: 5/15/2008 9:19:46 AM
•
BP EXPLORATION Page 2 of 4
Operations Summary Report
Legal Well Name: 04-17
Common Well Name: 04-17 Spud Date: 1/28/1986
Event Name: WORKOVER Start: 4/17/2008 End: 4/27/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/24/2008
Rig Name: NABOBS 4ES Rig Number:
I
Date
From - To Hours Task Code NPT Phase Description of Operations
4/20/2008 04:30 - 06:00 1.50 CLEAN P DECOMP RIH with dress-off BHA #1, picking up 3-1/2" DP.
06:00 - 06:30 0.50 CLEAN P DECOMP Service rig, check crown o matic, PVT system, conduct daily
derrick inspection, OK.
06:30 - 07:30 1.00 CLEAN P DECOMP PJSM. Continue in hole w/tubing dress off BHA. Ran 50 jts 3
1/2" DP total. 47K up wt, 47K down wt.
07:30 - 08:30 1.00 CLEAN P DECOMP PJSM. Pick up /make up Halliburton Storm Packer & set 30'
below wellhead. Release from packer, L/D DP. Close blind
/ good test.
08:30 - 09:30 1.00 BOPSU P DECOMP onduct weekly safety meeting with day crew.
09:30 - 11:30 2.00 BOPSU P DECOMP PJSM. Nipple down BOPE and tubing spool. Verify O/A is bled
down to zero psi. Apply steam to the wellhead.
11:30 - 12:30 1.00 WHSUR P DECOMP PJSM. BOLDs. Pull primary pack off. Take measurements and
verify that the emergency slips in this wellhead are the C-21
modified.
12:30 - 14:30 2.00 WHSUR P DECOMP PJSM. Install new primary and secondary packoff assembly.
N/U new tubing spool. Test pack off to 3500 psi / 30 minutes /
good test.
14:30 - 17:30 3.00 BOPSU P DECOMP PJSM. N/U BOPE.
17:30 - 18:00 0.50 BOPSU P DECOMP Tested BOPE breaks to 250 si low / 4000 si hi h.
18:00 - 19:30 1.50 BOPSU P DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. PU RTTS retrieving tool on jt of 3-1/2"
DP with closed TIW valve. Engaged RTTS with 21 RH
packer. Unset RTTS. POH and LD packer and retrieving tool.
19:30 - 00:00 4.50 CLEAN P DECOMP Held PJSM. Resumed RIH with dress-off BHA #1, picking up
3-1/2" DP.
4/21/2008 00:00 - 00:45 0.75 CLEAN P DECOMP Continued RIH with dress-off BHA #1, PU 3-1/2" DP. Tagged
at 9065' DPM. RU and circulated 20 bbls seawater through
BHA and float. Shut in well by closing annular BOP and TIW.
00:45 - 01:45 1.00 CLEAN P DECOMP Held weekly safety meeting with all night rig personnel.
Discussed Safety Alerts, STOP observations, and individuals'
safety and work concerns.
01:45 - 06:00 4.25 CLEAN P DECOMP Opened well, had no pressure or flow. PU kelly and
established parameters: PU 149k Ib, SO 120k Ib, Rot 125k Ib,
150a, 3000 Ib-ft, 4 bpm, 700 psi, 55 rpm, 5k - 10k WOB.
Rotated over 5-1/2" tubing stub at 9065' DPM. Varied pump
rate between 3 bpm at 440 psi and 5 bpm. Had heavy sludge
and semi-solid h drocarbon material in fluid returns. LD 1 jt
3-1/2" DP, PU 24' jt DP. Continued to rotate and wash over
5-1/2" tubing stub. Pumped 40 bbl High-Vis sweep, saw
intermittent torque increase as sweep turned corner.
06:00 - 08:00 2.00 CLEAN P DECOMP Continue to mill on tubing stub. Vary parameters. Looks like
the tubin is s innin at the PBR or K anchor. After milling for a
while, pick up and notice a 5 - 10 K overpull like we are pulling
the mill off the top of the stub. Go with high RPM & low weight,
pumping at 1 bbl /minute. Increase weight and before giving
up we set down on it fairly hard, (37K), and it popped over.
End of shoe ~ 9075'. Finish dressin off stub.
08:00 - 10:00 2.00 CLEAN P DECOMP PJSM. Circulate 2nd 40 bbls high vis sweep around ~ 5 bpm /
1000 psi.
10:00 - 11:00 1.00 CLEAN P DECOMP PJSM. Start to POOH, coming wet, mix and pump a dry job.
11:00 - 14:00 3.00 CLEAN P DECOMP PJSM. POOH w/ 3 1/2" DP & tubing dress off BHA.
Printed: 5/15/2008 9:19:46 AM
•
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name
Event Name:
Contractor Name:
Rig Name:
04-17
04-17
WORKOVER
NABOBS ALASKA DRILLING I
NABOBS 4ES
Date '~ From - To ' Hours ' Task Code I NPT
4/21 /2008 14:00 - 15:00
15:00 - 18:00
18:00 - 20:00
20:00 - 23:00
23:00 - 00:00
4/22/2008 00:00 - 01:30
01:30 - 04:30
1.00 CLEAN P
3.00 CLEAN P
2.00 CLEAN P
3.00 CLEAN P
1,00 CLEAN P
1.50 CLEAN P
Start: 4/17/2008
Rig Release: 4/24/2008
Rig Number:
Page 3 of 4
Spud Date: 1/28/1986
End: 4/27/2008
Phase Description of Operations
DECOMP PJSM. Stand back drill collars, UD dress off BHA. Good
indication of contact with end of tubing stub w/ inner mill.
DECOMP Clear /clean rig floor. Pick up BHA to drill out fas drill bridge
lu :cut lip guide, washpipe, shear guide, mill, 6 x 3-1/8 DC, 1
jt PAC DP, XO, oil jar.
DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. Repaired drawworks brake.
DECOMP RIH with junk mill BHA #2 on 92 stands 3-1/2" DP. Loaded
tubing into pipe shed and talllied same.
DECOMP Slipped and cut drill line.
DECOMP Slid washpipe over 5-1/2" tubin stub at 9074'. Sheared mi I
nuirle ~niith ink Ih CCl Waeherl frnm Qn7d' - A1dR' nickinn un
sin les. Pumped 3 bpm at 600 psi.
3.00 CLEAN P DECOMP PU kelly and established parameters: PU 145k Ib, SO 121k Ib,
Rot 132k Ib, 150a, 3000 Ib-ft, 40 rpm, 3-1/2 bpm, 600 psi, 3k -
5k WOB. fylilled tubing plug 9148' - 9150'. Lost fluid returns _
and had 60 psi pump pressure decrease after about 40
minutes. Continued rotating with 5k Ib WOB until tubing plug
let go. Set back kelly, chased plug to 9270' with 1 stand and 2
sin les. Had minor flow up DP. Pumped 1 DP volume of 60
bbls plus 20-bbl dry job at 4 bpm and 600 psi. Monitored well -
stable. Initial fluid loss rate about 100 bph.
04:30 - 13:00 8.50 CLEAN P DECOMP Held PJSM. POH with junk mill BHA #2, LD 3-1/2" DP_. On
13:00 - 14:30 1.50 CLEAN P DECOMP PJSM. Lay down BHA.
14:30 - 18:00 3.50 BUNCO RUNCMP PJSM. Clear /clean rig floor, pull wear bushing, rig up torque
turn, prep to run 4 1/2" TCII completion.
18:00 - 18:30 0.50 BUNCO RUNCMP Crew change. Check PVT alarms. Inspect Derrick.
18:30 - 19:00 0.50 BUNCO RUNCMP Hold PJSM & review completion running procedure. Assign
tasks to specific personnel.
19:00 - 20:00 1.00 BUNCO RUNCMP P/U & M/U completion Tail pipe assys & packer assy. Baker lok
all connections below packer.
20:00 - 00:00 4.00 BUNCO RUNCMP Con't to RIH w/ 4 1/2" 12.6#, L-80, TCII completion. Torque
Turn all connections to 3850 ft-Ibs. used Jet Lube Seal Guard
thread compound on all connections. RIH w/ 60 jts in hole.
Using continuous fill while RIH w/ completion.
4/23/2008 00:00 - 06:00 6.00 BUNCO RUNCMP Con't to RIH w/ 4 1/2" 12.6#, L-80, TCII completion. Torque
Turn all connections to 3850 ft-Ibs. Using Jet Lube Seal Guard
thread compound on all connections. Using continuous fill while
RIH w/ 180 jts..
06:00 - 06:30 0.50 BUNCO RUNCMP Service rig, check crown o matic, PVT system, OK. Perform
daily derrick inspection.
06:30 - 08:30 2.00 BUNCO RUNCMP Continue in hole with 4 1/2" TCII completion. P/U jt # 218. Up
wt = 107K, down wt = 94K.
08:30 - 11:00 2.50 BUNCO RUNCMP PJSM. RIH w/ # 218, circulating @ 2 1/2 bpm / 100 psi.
Observe both sets of shear screws sheared, located out 33' on
#218. Laid down #218, (hanger, pup and RKB = 22.13'). Laid
down jt #217, inserted (1) space out put ... 7.80', and made up
Jt # 217. Made up hanger, landed, RILDs.
11:00 - 15:00 4.00 BUNCO RUNCMP PJSM. Line up and pump 400 bbls heated seawater w/
corrosion inhibitor ~ average rate of 2 bpm, 1800 psi, taking
partial returns up the tubing.
15:00 - 17:00 2.00 BUNCO RUNCMP PJSM. Line up w/ Little Red and pump 125 bbls diesel down
Printed: 5/15/2008 9:19:46 AM
•
BP EXPLORATION Page 4 of 4
Operations Summary Report
Legal Well Name: 04-17
Common Well Name: 04-17 Spud Date: 1/28/1986
Event Name: WORKOVER Start: 4/17/2008 End: 4/27/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 4/24/2008
Rig Name: NABOBS 4ES Rig Number:
I
~
Date From - To Hours Task Co de
! NPT
~ Phase Description of Operations
4/23/2008 15:00 - 17:00 2.00 BUNCO RUNCMP I/A C~ 2 - 3 bpm / 1750 psi, taking partial returns up the tubing.
17:00 - 18:00 1.00 BUNCO RUNCMP R/U on tubing & pump 25 bbls of diesel down tubing to freeze
protect. Pumped 3 BPM ~ 300 psi. Allow well to U-tube.
18:00 - 18:30 0.50 BUNCO RUNCMP R/U & drop Rod/Ball allow to fall. Crew Change. Inspect
derrick. Check PVT alarms.
18:30 - 21:00 2.50 BUNCO RUNCMP R/U lines to tubing & IA. Pressure up on tubing to 4000 psi, set
Baker Premier Packer & hold for 30 min. Bled tubin to 1500
psi & SI. Pressured up on IA to 4000 psi & held for 30 min.
ested good. Bled off IA & tubing to 0 psi. Blow down lines &
R/D test equip.
21:00 - 22:00 1.00 BUNCO RUNCMP Set & test TWC from top to 1000 psi for 10 min. Charted same.
22:00 - 23:30 1.50 BOPSU P RUNCMP N/D BOPE.
23:30 - 00:00 0.50 WHSUR P RUNCMP N/U adapter flange.
4/24/2008 00:00 - 02:00 2.00 WHSUR P RUNCMP Finish N/U adapter flange & X-mas tree. Pressure test hanger
void & tree to 5000 psi for 15 min each. Tested Good.
02:00 - 04:30 2.50 WHSUR P RUNCMP Wait on DSM _ 1 hour. R/U & test lubricator to 500 psi. Pull
TWC. Install BPV & UD lubricator.
04:30 - 06:00 1.50 WHSUR P RUNCMP Finish dressing & securing tree. Clean cellar. RELEASE RIG
C~3 0600 hrs.
Printed: 5/15/2008 9:19:46 AM
Digital,Well File • Page 1 of 1
•
Well: 04-17
Well History
Well Date Summary
04-17 4/27/2008 T/I/0=vac/0/0; Pulled 4-1/16" CIW "H" BPV thru tree, post rig; 1-2' ext. used, tagged C~? 96";
***Complete*** (Best/Wortham)
04-17 4/27/2008 *'**WELL S/I ON ARRIVAL*'**(post rig)
RIG UP SLICKLINE
****CONT JOB ON 4-28-08****
04-17 4/28/2008 ****CONT JOB FROM 4-27-98****(post rig)
PULL B&R FROM 8971' SLM.
PULL RHC PLUG BODY FROM 8989' MD. TUBING FL=900'
DRIFT TUBBING W/ 3.50" CENT, TEL, AND SAMPLE BAILER, LOC EOT C~ 9231' SLM (9250' ELM )
19' CORRECTION SD C~ 9652' SLM (9671' ELM) PERFORATIONS APPEAR TO BE OPENED.
***WELL S/I ON DEPARTURE*** (DSO NOTIFIED )
04-17 5/15/2008 T/I/0=710/vac/0+. Temp=Hot. IA FL pre MIT-IA (AOGCC). IA FL near surface. IA has Integral installed.
04-17 5/17/2008 T/I/0=700/0/0. Temp=Hot. AOGCC MIT-IA to 2500 psi PASSED (witnessed by C. Scheve). Pressure up
IA to 2500 psi with 5 bbls of meth, SI start test. IA lost 50 psi in first 15 min and 10 psi in the second 15
min, for a total loss of 60 psi in 30 min. During test the OAP increased 20 psi. Bled IAP fro 2440 psi to 0
psi. Final WHP's=700/0/20.
04-17 5/17/2008 T/I/0= 700/0/0. AOGCC MITIA to 2500 psi ***PASS**' (witness by C. Scheve). Pumped 5.5 bbls meth
down IA to reach test pressure. 15 min. IA lost 50 psi. 30 min. IA lost 10 psi. for a total loss of 60 psi.
Bled pressure back to 0 psi. FINAL WHP = 700/0/0. ANNULUS CASING VALVES TAGGED AND LEFT
OPEN ON DEPARTURE.
Print Date: 6/4/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 6/4/2008
TREE _ ?
WELLHEAD= FMC
ACTUP~TOR = AXELSON
KB. ELEV = 62'
BF. ELEV =
KOP =
Max Angle =
Datum MD =
Datum TVD = ?
38 ~ 4700'
9792'
8800' SS
DRLG DRAFT
K-55 f72#, L-80, ID = 12.347" I~ 3522'
Minimum ID = 4.455" @ 9248'
5-1 /2" OTIS XN NIPPLE '
O ~ -17 SAFE71~iVOTES: "'Tx1A COMM. OPBL4TING LIMITS:
MAX IAP = 2000 PSI, MAX OAP = 1000 PSI (03/08!06
WAIVER) -NOTE PWI ONLYINO MI INJECTION
ALLOWED"'
1995' HES 9cr X Nipple ID = 3.813"
4-1/2" TCII TBG, 12.6# L-80 .0152 bpf, ID = 3.958"~ 9051' 8911' HES 9cr X Nipple ID = 3.813
8941' 9 5/8" x 4 1/2" Baker Prerrier
"
Packer ID = 3.875
8968 HES X Nipple ID = 3.813"
8989' HES XN Nipple ID = 3.725"
~ 9053' S-1 /2" x 9 518" Unique Overshot
9126' S-1/2" BOT PBR ASSY
S-1/2" TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892" 9~Q'
9144' 9-5/8" X 5-1 /2" BOT 3-H PKR
9248' 5-112" OTIS XN NIP, ~ = 4.455"
PERFORATION SUMMARY
REF LOG: BHCS ON 02/11/86 9259' S-1/2" BAKER SHEAROUT SUB
A NGLE AT TOP PERF: 21 ~ 9610'
Note: Refer to Production DB for historical pert data 9260' 5-1/2" TUBING TAL
S¢E SPF INTERVAL Opn/Sqz DATE
4 0.25 9610 -9654 O 10/29/86 9250' ELMD TT LOGGED 02/14/86
4 4 9665 - 9704 O 06/06/86
9-5/8" CSG, 47#, L-80, ~ = 8.681" H 9855'
(LEFT 03/27/95)
COMPLETION
PRUDHOE BAY UNfT
WELL: 04-17
PERMIT No: 1860200
API No: SO-029-21532-00
SEC 26, T11 N, R15E, 4225.9' FEL 8 1206.31' FNL
BP 6cploration (Alaska)
•
•
MEMORANDUM state of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Thursday, May 22, 2008
To: Jim Regg
P.I. Supervisor ~~; =~ j2Z'uu3 SUBJECT: Mechanical Intea•ity Tests
(~ BP EXPLORATION (ALASKA) INC
1 04-17
FROM: Chuck Scheve PRUDHOE BAY UNIT 04-17
Petroleum Inspector
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv ~}!'~'~--
Comm
Well Name: PRUDHOE BAY UNIT 04-17 API Well Number: 50-029-2 1 5 3 2-00-00 Inspector Name: Chuck Scheve
Insp Num: mitCS0805 1 8 1 5 1 245 Permit Number: t86-020-0 - Inspection Date: si17~2o08
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
--
__ ~ YP J ~T- --- - _ _-
Well T e In'. ; TVD IA o zsoo
- - ---- ~ -
-+~ ~ ---
P.T. I86ozoo I YP ! sP ; p • '' zozoo zs -0A o _ I z~- zaso ; zaao I
~T eTest Test si ~_- -; zo zo
wRKOVR P Tubin 700 70- o
Interval P/F l g j i 700 ~ 700
Notes:
~~~E~ JUN ~ 20~~
Thursday, May 22, 2008 Page l of I
~J
l i/ I E l i/ I ®1 ~ A N D L T l~/ I
TO: Jim Regg
P.l. Supervisor ~~~ ~f ~~/~~~
FROm: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, May 19, 2008
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) [NC
04-17
PRUDHOE BAY UNiT 04-17
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv -,
Comm
Well Name: PRUDHOE BAY UNIT 04-17 API Well Number: 50-029-21532-00-00 Inspector Name: Jeff Jones
Insp Num: mitJJ080517121056 Permit Number: 186-020-0 Inspection Date: 5/13/2008
Rel Insp Num:
oa 17 _ Ta~er II D8 08h IA Pretest Initial 15 Mm 3440 n. 145 m.
-- T--
-,- p ~-- - 60 Mm.
--- T --
YP w i ~ ! 1 oao 4000
--- --
- --
', P.TII Is6o2oo TYpeTest ~ sPT1_ psi ~ z2z7 i OA ', o o o ; o
-- - __- -T
'Interval [MTAL p~F P / Tubing 1030 1030 I ]030 1030 ~
- -- -- --- - - - -- `---- --- - _ I'_
Notes' S BBLS 60/40 methanol pumped.
i~~~~~9~~ JVL I.i ~ 20G8
Monday, May 19, 2008 Page I of 1
•
~~~ ~ ~~ ~ J ~~ ~ ~
} ~ ~ SARAH PA
~,, ,7 ~ L/N, GOVERNOR
OII/ AZ~D a]ray7 333 W. 7th AVENUE, SUITE 100
C01~5ERQA'TIO1~T COl-II~i15SIO1~T ANCHORAGE, ALASKA '99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
David Reem
BP Exploration Alaska, Inc.
PO Box 196612 ~~~ ~,pR Q ~ ~~~$
Anchorage, AK 99519-6612
Re: Prudhoe Bay FYeld, Prudhoe Bay Oil Pool, PBU 04-17 ~- ~ 0~
Sundry Number: 308-122 ~~
Dear Mr. Reem:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
G, ~ Chair
DATED this 1 da of A r31 2008
- Y P
Encl.
_ _ __ _ __ ® ,~a ~ /
U' ",v
~' STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION ~~~ Ap U ~ /~
APPLICATION FOR SUNDRY APPROVAL ~
Alaska Oif ~ G n otnrnissior
20 AAC 25.280 ~ _ _,_ _
1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension
^ Alter Casing Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program 1® Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ^ Development ^ Exploratory 186-020
3. Address: ®Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21532-00-00 '
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU 04-17 •
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s):
ADL 028324 • 62' ~ Prudhoe Bay Field / Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
9868' 8933' ' 9769' 8840' None 9863'
asin Len th Size MD TVD Burst Colla se
Structural
Conductor 120' 20" 120' 120' 1490 470
Surface 3522' 13-3/8" 3522' 3502' 3450 1950
Intermediate
Production 9855' 9-5/8" 9 55' 8921' 6870 4760
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
9610' - 9704' 8691' - 8779' 5-1/2", 17# L-80 9260'
Packers and SSSV Type: 9-5/8" x 5-1/2" Baker'3-H' packer Packers and SSSV MD (ft): 9144'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ^ Development ®Service -
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: April 24, 2008 ^ Oil ^ Gas ^ Plugged ^ Abandoned
17. Verbal Approval: Date:
SWAG ~ ^ GINJ Ott" ^ WDSPL
Commission Representative:
18. I hereby certi hat the foregoing is true and correct to the best of my knowledge. Contact Aras Worthington, 564-4102
Printed Nam avid Reem Title Engineering Team Leader
Prepared By Name/Number:
Signature Phone 564-5743 Date ¢ dg Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number: O
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity ~OP Test mechanical Integrity Test ^ Location Clearance
Other: ~0~~ Q ST\ 1~~~ ~ S }'
Subsequent Form Required: 1 ~ O
APPROVED BY v
A roved B COMMISSIONER THE COMMISSION Date Q
Form 10-403 web 06`/2006 Submit Ir~Duplicate
ORIGIl~AL .~.~~.~~~'
•
by
cr,~,y
04-17i Rig Workover
•
Scope of Work: Cut & Pull 5-1/2" L-80 completion, change out 9-5/8" casing packoffs, Run new 4-1/2" L-
80 completion.
MASP: 2600 psi
Well Type: Injector
Estimated Stara Date: April 24th, 2008 f
Pre-rip prep work:
O 1 Check the tubing hanger and IC casing hanger lock down screws for free movement.
Completely back out and check each lock down screw for breakage (check one at a time).
PPPOT-T & IC.
E 2 Set 5-1/2" Fasdril in middle of the first full 'oint below the acker at 9175' (Ref: 3/30/86 tubing
summar
F 3 CMIT TxIA to 4000 si.
E 4 Jet cut @ 9090', 10' from the top of is full joint above the packer (Ref: 3/30/86 tubing
summa
F 5 Circulate/bullhead seawater thru the cut. Bleed WHP's to 0 si.
W 6 Set BPV
O 7 Remove the wellhouse & flow line. Level the ad as needed for the ri .
Proposed Procedure:
1. MIRU Nabors 4es. Circulate out freeze protection fluid with sea water through the cut. ND tree. NU
and test BOPE to 250 psi low, 35Q0 psi high.
2. Pull and LD 5-1/2" tubing string. ~{>~~ ~~~`'l.(.1
3. Change out 9-5/8" Casing packoffs through the stack.
4. Run new 4-1/2" L-80 premium threaded tubing stacker packer completion with packer at 8975' MD.
5. Displace the IA to packer fluid and set the packer.
6. Test Tubing & IA to 4000 psi. Freeze protect to 2200' MD.
7. Set TWC. ND BOPE. NU and test tree. Pull TWC and Set BPV. RDMO.
TREE _ 7
WELLHEAD = FMC
ACTUATOR = AXELSON
KB. ELEV - 62'
BF. ELEV
KOP-
Max Angle= 38 @ 4700'
Datum MD = 9792'
Datum TVD = 8800' SS
~ 113-3/8" CSG, 68#, K-55 /72#, L-80, ID = 12.347" I~ 3522'
Minimum ID = 4.455" @ 9248'
5-1/2" OTIS XN NIPPLE
9144' I-I9-5/8" X 5-1/2" BOT 3-H PKR
9248' I~ 5-1 /2" OTIS XN NIP, ID = 4.455"
15-1/2" TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892" I
SAF TES: "*"Tx1A COMM. OPERATING LIMITS:
O ~ -17 MAX - 2000 PSI, MAX OAP =1000 PSI (03108/06
WAIVER) -NOTE PWI ONLY/NO MI INJECTION
ALLOWEO***
2217' 5-1/2" CAM BAL-O SSSV NIP, ID = 4.562"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 9011 8143 27 CA/MMIG RK
5-1/2" BOT PBRASSY
9259' 5-1/2" BAKER SHEAROUT SUB
PERFORATION SUMMARY 9260' S-1/2" TUBING TAIL
REF LOG: BHCS ON 02/11/86
9250' ELMD TT LOGGED 02/14/86
A NGLE AT TOP PERF: 21 @ 9610'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
4 0.25 9610 - 9654 O 10/29/86
4 4 9665 - 9704 O 06/06/86
9-5/8" CSG, 47#, L-80, ID = 8.681" I-( 9855'
9863'
(2) PADS FROM GEOPHONES
(G&I) (LEFT 03/27/95)
TD I-i 9868'
DATE REV BY COMMENTS DATE REV BY COMMENTS
02/14/86 ORIGINAL COMPLETION
11/23/03
KDC/PAG
WANERSAFETY NOTE _
03/01/06 TEL/PJC SET PXN PLUG @ 9248'
03/16/06 EZL/PAG WAVER SAFETY NOTE (03/08/06)
05/29/06 DFR/DTM CSG CORRECTION (11/24104)
07/12/06 KNC/TLH PXN PLUG PULLED (03/05/06)
PRUDHOE BAY UNTf
WELL: 04-17
PERMfT No: 1860200
API No: 50-029-21532-00
SEC 26, T11 N, R15E, 4225.9' FEL & 1206.31' FNL
BP Exploration (Alaska)
LHEA D = FMC
CTUATOR = _ AXELSON
. EL~1/ = 62'
F. ELEV =
OP = _?
x Angle = 38 ~ 4700'
tum MD = 9792'
tum TV D = 8800' SS
13-3/8" CSG, 68#, K-55 /72#, L-80, ID = 12.34T' H 3522'
Minimum ID = 3.813" ~ 2200'
4-112" HES XN NIPPLE
~ 41/2" TBG, 12.6#, L-80, TGII ID = 3.958" ~
j HES X Nipple ID = 3.813" ~
41/2" x 95/8" Baker S3 Packer
~ HES X Nipple ID = 3.813" ~
I 41/2 1/2 Muleshoed joint
"
'
" 9128' 5-1/2" BOT PBR ASSY
5-1/2
9260
TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892
8144' 9-5/8" X 5-18" BOT 3-H PKR
PERFORATION SUMMARY
9248' 5-1/2" OTIS XN NIP, ID = 4.455"
REF LOG: BRCS ON 02/11 /86
ANGLEATTOPPERF: 21 X9610' 9259' 5-18"BAKERSHEA ROUT SUB
Note: Refer to Production DB for historical perf data
SQE SPF INTERVAL OpnlSgz DATE 9260' 5-112" TUBING TAIL
4 0.25 9610 -9654 O 1089186
4 4 9665 - 9704 O 06!06/86 9250' ELMD TT LOGGED 02/14/86
s-5/a° CSG, 47#, L-eo, ID = 9.681" H 9855'
•4-17 Propose
TD H 9888'
2200' H HES X Nipple, ID = 3.813"
9863' (2) PADS FROM GEOPHONES
(G8Q (LEFT 03/27/95)
DATE REV BY COMNf1=NfS DATE REV BY COMMENTS
02/14/86 ORIGINAL COMPLETION
1183/03 KDC/PAG WANER SAFETY NOTE
03/01 /~ TEUPJC SET PXN PLUG ~ 9248'
03116/06 EZUPAG WANERSAFETY NOTE(03/08106)
05/29/06 DFR/DTM CSG CORRECTION (1184/04)
07l12/~ KNCJTLH PXN PLUG PULLED (03!05/06)
PRUDHOE BAY UNIT
VVE1L: 0417
PERMIT No: 1860200
API No: 50-029-21532-00
SEC 26, T11 N, R7 5E, 4225.9' FEL & 1206.31' FNL
~ Exploration (Alaska)
• •
t
~_ ,° ~ ~ ;' , ~ i SARAH PALIN, GOVERNOR
ALASSA OIL AI'1TD (zA,S '1
~T -~t~ ~T ~T 333 W. 7th AVENUE, SUITE 100
CO1sSERQAilOis CO~SSIOi~ ;'' ANCHORAGE,ALA5KA 99501-3539
~~ PHONE (907) 279-1433
FAX (907) 276-7542
CANCELLATION
SUNDRY APPROVAL N0.301-1b2
Ms. Anna T. Dube ~~ ~ ~ ~~..~ ~ R~~~~s
Attention: Well Integrity Coordinator, PRB-20
BP Exploration (Alaska) Inc.
P.O. Box 196612 ` ~ tCJ ''" a ~„Q
Anchorage, AK 99519-6612 i
RE: Cancellation of Sundry Approval 301-162 (Well PBU 04-17)
Dear Ms. Dube:
Pursuant to BP Exploration (Alaska), Inc. ("BPXA")'s request dated January 18, 2008
Alaska Oil and Gas Conservation Commission (``Commission") hereby cancels Sundry
Approval 301-162, which allows continued water injection. This well exhibited tubing
by inner annulus communication, and BPXA did not at the time propose repairing the
well to eliminate the problem. The Commission determined that water injection could
safely continue in the well, but subject to conditions set out in the sundry approval.
Since then, BPXA has shut in and does not plan to operate PBU 04-17 until repairs have
been completed. Consequently, Sundry Approval 301-162 no longer applies to operation
of this well. Instead, injection in well PBU 04-17 will be governed by provisions of the
underlying Area Injection Order No. 4E.
The copy of Form 10-404, Report of Sundry Operations, provided with BPXA's request
noting the cancellation of Sundry 301-162 has been placed in the Commission's files.
DONE at Anchorage, Alaska and dated February 1, 2008.
)il and Gas Conservation Commission
~ ~
Cat y P. erster
Commis oner
•
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
January 18, 2008
Mr. John Norman, Chairman
Alaska Oil & Gas Conservation Commission
333 W . 7th Ave.
Anchorage, Alaska 99501
Subject: Prudhoe Bay Unit well 04-17 (PTD #1860200)
Application for Cancellation of Sundry #301-162
Dear Mr. Norman:
by
This request is to cancel Sundry #301-162 for Prudhoe Bay Unit well 04-17 (PTD
#1860200). The Sundry, originally issued October 11, 2001, was for continued water
injection with tubing by inner annulus communication. The well no longer adheres to
BP's Well Integrity System Policy and will remain shut-in until the well has been
repaired. An AOGCC witnessed MITIA for UIC compliance will be conducted once
integrity has been restored and the well is on injection. The application for Sundry
cancellation form 10-404 is attached.
If you require any additional information, please contact Andrea Hughes or myself at
(907) 659-5102.
Sincer ly,
/ ~ ,~~-
~G ~ ;~~
Anna T. Dube, P.E.
Well Integrity Coordinator
_~~0~
gee ~n~s
\ask~` Qee ~ ~~~~~~;~~e
~~SCo' ~O
• •
Attachments:
Application for Sundry Cancellation form 10-404
STATE OF ALASKA ~~~~c<'
ALA A OIL AND GAS CONSERVATION COM~SION ~~P''~~
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ~ Repair Well ~ Plug Perforations ~ Stimulate ~ Other ~ Cancel Sundry
Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver ~ Time Extension [] 301-162 '
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development Exploratory 186-0200 '
3. Address: P.O. Box 196612 Stratigraphic ~~ SerV1Ce '~ 6. API Number:
Anchorage, AK 99519-6612 50-029-21532-00-00
7. KB Elevation (ft): 9. Well Name and Number:
62 KB' PBU 04-17
8. Property Designation: 10. Field/Pool(s):
ADLO-028324 ~ Prudhoe Bay Field/ Prudhoe Bay Pool
11. Present Well Condition Summary:
Total Depth measured 9868 feet Plugs (measured) Tagged PBTD@ 9753' 7/28/97
true vertical 8933.04- feet Junk (measured) 9863
Effective Depth measured 9753 feet
true vertical 8825 feet
Casing Length Size MD TVD Burst ~I ~
Conductor 120 20" Surface 120 Surface 120 .~n~R
Surface 3460 13-3/8" 68# K-55/L-80 Surface - 3522 Surface - 3502 3450/5020 ~~11 ~ ~5~+~b
~~F~
"
4n~60~~~~1gg1
47# L-80 Surface - 9855 Surface - 8921 6870 =
Production 9763 9-5/8
~ ~a
~~oca9e
~n
Perforation depth: Measured depth: See Attachment - _ _
True Vertical depth: _ _
Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 36 - 9260
0 0 -
Packers and SSSV (type and measured depth) 9-5/8"x5-1/2" bot 3-H pkr 9144'
0 0
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ~' Service ~'
Daily Report of Well Operations 16. Well Status after proposed work:
het u, ~38R- Oil ~' Gas WAG .C~,, GINJ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
301-162 ~
Contact Anna Dube Prepared by Gary Preble 564-4944
Printed Name Anna e Title Well Integrity Coordinator
Phone 907-659-5102 Date 1/7/2008
Sig tur , , ,~
~s
Form 10-404 Revised 04/2006 ~~I~i(~~ I~ag Submit Original Only
- •
04-17
186-0200
Perforations Attachment
Perforation Depth MD (ft) Opn/Sqz Perforation Depth TVD (ft) __
9612'-9612' O 8693'-8693'
9616'-9616' O 8697'-8697'
9620'-9620 O 8701 '-8701
9624'-9624' O 8704'-8704'
9628'-9628' O 8708'-8708' _
9632'-9632' O 8712'-8712'
9636'-9636' O 8716'-8716'
- ~ 9640'-9640'
9644'-9644' O --
~ O 8719'-8719' _
8723'-8723'
9646'-9646' O 8725'-8725'
9650'-9650' O _
8729'-8729'
9654'-9654' O 8732'-8732'
9665'-9672' O 8743'-8749'
9675'-9704' O 8752'-8779'
04-17 (PTD #1860200) Internal ~ver Cancellation -Not Operable Well Page 1 of 1
Re James B DOA
99, ( )
From: Lau, John, Jack [IaujjO@BP.com] on behalf of NSU, ADW Well Integrity Engineer ~p tlr ~ (Oo
[NSUADWWeIIlntegrityEngineer@BP.com] ~~ "7
Sent: Monday, December 31, 2007 6:06 AM
To: NSU, ADW Well Operations Supervisor; Rossberg, R Steven; GPB, FS2 DS Ops Lead; GPB, Area Mgr
East (FS1/Z/COTU/Seawater); GPB, FS2/COTU OTL; GPB, Wells Opt Eng; GPB, EOC Specialists; Engel,
Harry R; Regg, James B (DOA); Maunder, Thomas E (DOA)
Cc: Chivvis, Robert; NSU, ADW Well Integrity Engineer; NSU, ADW WI Tech; Lau, John, Jack; Holt, Ryan P
(ASRC); Dahlem, Jason E
Subject: 04-17 (PTD #1860200) Internal Waiver Cancellation -Not Operable Well
All,
An internal waiver was issued for TxIA communication on water injector 04-17 (PTD #1860200) on 03/08/06. The
dispensation from the Well Integrity System Policy for this well has expired. Please ensure the well has been shut-in by
the end of today and arrangements have been made to freeze protect the well.
The well has been reclassified as Not Operable. A secure program will be sent shortly. Please remove all Waivered well
signs and the laminated copy of the waiver from the wellhouse.
/'
The paperwork to cancel the corresponding AOGCC Sundry #301-162 will be signed and mailed this week.
Please call if you have any questions.
Thank you,
Jack Lau (for Anna Dube)
Well Integrity Coordinator
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
~~~;~"~~ JAS ~ ~ ~~~
1/17/2008
.
.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email toWinton_Äubert@admin.stateakus;Bob_F!eckenstein@admin.stateak.us: Jim_Regg@admin.stateakus TJm_Maunder@admin.stateakus
OPERATOR:
FIELD I UNIT I PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (,Älaska) Inc.
Prudhoe BayiPBUIDS04
03112107
Andrea Hughes
-;(¿11 '~¡Hù7
\Cßto-'ód-D
Packer Depth Pretest Initial 15 Min. 30 Min.
We1l104-17 I Type Inj. I N TVD I 8.262' Tubing 380 2,420 2,420 2,420 Interval I V
P.TD.11860200 I Typetest I P Test psil 2400 Casing 480 2,440 2,420 2,420 PIFI P
Notes: AOGCC declined to witness CMIT-TxIA for OA 0 0 0 0
Regulatory Compliance.
Weill I Type Inj. I TVD I Tubing I IntervalT
P.TDI I Type test I T est psi! Casing PIFT
Notes: OA
Weill I Type Inj. TVD I Tubing I I IntervalT
P.TDI I Type testJ Test psil Casing I PIFT
Notes: OA r
Weill I Type Inj.1 TVD I Tubing I I I Intervail
P.TDI I Type test I Test psi! Casing I I I PIF!
Notes: OA I I
Weill ! Type Inj.! I TVD I I Tubing I I I Interval!
PTD.I I Type test! I Test psi! Casing I I PIF!
Notes: OA I I
TYPE INJ Codes
D = Dnlling Waste
TYPE TEST Codes
M = ,A,nnulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
0= Differential Temperature Test
INTERVAL Codes
G = Gas
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
o = Other (describe in notes)
¡ = Industrial Wastewater
N = Not Injecting
W = Water
SCANNED MAR 2 7 2007
I- '..;. .,,t ........"..-"...._.'""~~,"_...."....""..~ ,-."
MIT Report Form
BFL 911105
MIT PBU 04-17 03-12-07 xis
./
Jim Regg
P.I. Supervisor
)
.p".. . ,)1 j £;i~)
Iytrq
Alaska Oil and Gas Conservation CommL )
State of Alaska
MEMORANDUM
TO:
DATE: Thursday, April 28, 2005
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
04-17
PRUDHOE BAY UNIT 04-17
Src: Inspector
n! é' Ó a;fJ
\ö'Ø
FROM: Lou Grimaldi
Petroleum Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv,:1'~
Comm
Well Name: PRUDHOE BAY UNIT 04-17
Insp Num: mitLG050418193332
Rei Insp Num:
API Well Number: 50-029-21532-00-00
Permit Number: 186-020-0
Inspector Name: Lou Grimaldi
Inspection Date: 4/18/2005
Packer Depth Pretest Initial
Well 04-17 Type Inj. N TVD 8262 IA 2550 2300
P.T. 1860200 TypeTest SPT Test psi 2065.5 OA 0 0
Interval OTHER PIF P Tubing I 2550 2300
15 Min. 30 Min. 45 Min. 60 Min.
2340 2340
0 0
2300 2300
Notes: Second part of test required for variance satisification. Dropped TxIA pressure and observed for thirty minutes.
SCANNED MAY 3 1 2.005
Thursday, April 28,2005
Page I of 1
MEMORANDUM
TO:
Jim Regg
P.I. Supervisor
)
Xey1 ~/10)D5"
State of Alaska
Alaska Oil and Gas Conservation Comm. )1
DATE: Thursday, April 28, 2005
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
04-17
PRUDHOE BAY UNIT 04-17
; öifJ
~
FROM: Lou Grimaldi
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv ·,S.se-
Comm
Well Name: PRUDHOE BAY UNIT 04-17
Insp Num: mitLG050418192616
Rei Insp Num:
NON-CONFIDENTIAL
API Well Number: 50-029-21532-00-00
Permit Number: 186-020-0
Inspector Name: Lou Grimaldi
Inspection Date: 4/18/2005
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well 04-17 Type Inj. N TVD 8262 IA 0 2500 2550 2550 2550
P.T. 1860200 TypeTest SPT Test psi 2065.5 OA 0 0 0 0 0
Interval OTHER P/F P Tubing 0 2500 2550 2550 2550
Notes: Combo MIT T/IA for variance satisfication.
SCANNED MAY 3 1. 2005
Thursday, April 28, 2005
Page 1 of 1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska)Inc.
Prudhoe Bay / PBU / DS04
04/26/03
Clark Olsen
I
Packer Depths (ft.) Pretest Initial 15 Min. 30 Min.
w.,,io,.~I Typelnj. I~ I==,~V=I 9,144'Is,262' Tubing[ 01 2soo[ 24501 24101 Interva{ 2I
P.T.D.11860200 Type test I P I Test psiI 20661 Casin~l 3001 2700l 27001 2700l P/FI P
Notes: This is a CMIT TxlA against a TTP, AOGCC Sundry/k301-162 approved for rapid TxlA comm.
I
WeUI Type Inj.
P.T.D.I
Notes:
WellI
P.T.D.I
Notes:
WellI
P.T.D.I
Notes:
WellI
Not~s:
Type Inj.
Type Inj.
Type Inj,
Test Details:
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
O = Other (describe in notes)
MIT Report Form
Revised: 06/19/02
2003-0426_MIT_PBU_04-17.xls
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request:
Abandon_ Suspend_ Operational shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program _ Pull tubing _ Variance _ Perforate _
(Ann Corn)
Other _X
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
4484' FNL, 5000' FEL, Sec. 26, T11N, R15E, UM
At top of productive interval
1352' FNL, 4269' FEL, SEC. 26, T11N, R15E, UM
At effective depth
At total depth
1207' FNL, 4227' FEL, Sec.26, T11N, R15E, UM
12. Present well condition summary
Total depth: measu red
true vertical
5. Type of Well:
Development __
Exploratory __
Stratigraphic __
Service__X
(asp's 713089, 5952675)
(asp's 713723, 5955826)
(asp's 713761,5955973)
9868 feet Plugs (measured)
8933 feet
6. Datum elevation (DF or KB feet)
RKB 62.0 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
04-17i
9. Permit number / approval number
186-020
10. APl number
50-029-21532
11. Field / Pool
Prudhoe Bay Oil Pool
Tagged PBTD @ 9753' MD on 7/28/1997.
Effective depth: measured
true ve rtical
Casing Length
Conductor 120'
Surface 3460'
Production 9793'
9753 feet Junk (measured)
8825 feet
Size Cemented Measured Depth True vertical Depth
20" 1814# Poleset 120' 120'
13-3/8" 3300 sx cs m & 600 Sx cs H 3522' 3502'
9-5/8" 700 sx Class o 9855' 8921'
Perforation depth:
measured 9610' - 9654'; 9665' - 9672'; 9675' - 9704'.
true vertical8691'-8732.5'; 8743'-8749'; 8752'-8779'.
Tubing (size, grade, and measured depth
Packers & SSSV (type & measured depth)
5-1/2", 17#, L-80 @ 9260' MD.
9-5/8" X 5-1/2" BeT 3-H PACKER @ 9144' MD.
5-1/2" Camco BAL-0 SSSV Nipple @ 2217' MD.
13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __
15. Status of well classification as:
14. Estimated date for commencing operation
.:.:.:.:.:.:.:.:.:.:.:~:.:.:.:~:~:.:.:.:.:.:.:.:.:.:.:.:.:.:.:`:.:.:.:.:.:~:.:.:.:.:
16. If proposal was verbally approved
Name of approver
Date approved
Oil __
Service Water Inj
Gas__ Suspended__
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Questions? Call Joe Anders @ 659-5102.
SignedJoe A~e¢ ~ Title: PRB Well Integrity Engineer (North Slope) PreparedDateb~/Paul Raufb/l~/0 '564-5799
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness ~.~:~'~'t~"t.(~,~,~k' I Approval no/') x-~! ! !
Plug integrily__ BO, P Test__ Location Clearance__ , I
Mechanical Integrity Test _~ ..... Subsequent form required 10- ~r'~t::~,t~-~t~,%~ ~'(t~\txc~ r4% ~~.~.~v
Approved by order of the Commission 8-%,'~-,,~ ~ Commissioner Date _
Form 10-403 Rev 06115/88 · SUBMIT' IN TRIPLICATE
04-17
Sundry Application Action Plan
06/10/01
Well History and Status
Well 04-17 (PTD 186-020) failed an MITIA on 04/01/01. The leak rate was 2.5 BPM at
400 PSIG. A TTP was set and a CMIT TxlA passed to 2500 psi on 04/25/01. A leak
detect log located a tubing leak at 1470' on 05/07/01. The TTP has been pulled and the
well is currently injecting 10,800 BWPD at 2600 psi.
This sundry request is to allow for continued injection of water into Well 04-17. The
following supports the request:
A CMIT-TxlA Passed on 04/29/01 to 3000 psi against a tubing plug,
demonstrating competent production casing.
Pressures and injection rates will be monitored and recorded daily and checked
for indications of a production casing leak.
A CMIT TxlA against a TTP will be conducted every 2 years to confirm
production casing integrity.
Proposed Action Plan
1. Allow well to continue water-only injection.
2. Perform combination MIT Tubing x IA against a plug every 2 years.
3. Record wellhead pressures and injection rates daily.
4. Submit a monthly report of daily pressures and injection rate.
5. Stop injection and notify the AOGCC if there is any indication of loss of production
casing integrity.
TREE = ?
WFI LHEAD= FMC
ACTUATOR= AXELSON
KB. ELEV = 62
BF. ELEV =
KOP -- ?
Max Angle = 38 @ 4700
Datum MD -- 9792
Datum TVD= 8800 SS
I 13-3/8"CSG, 72#, L-80, ID=12.347 ]--J 3522'
04-17
2217'
SAFETY NOTES
HS- 1/2" CAM BA L-O SSSV NIP,ID= 4.562
GAS LFT MANDRELS
TYPEMANICA/IVIVIIG LAR~TCHI
IMinimum ID = 4.455" @ 9248'
5 1/2" OTIS XN NPPLE
9126' H 5-1/2,, BOT mRASSY J
I5.1/2'''rBG-PC'17#'L80,0'0232bpf'ID=4'892 I'-'[ 9260'
9248' J-t 5-1/2"o'nSXNN'PR-E"D:4'455 I
PERFORATION SUMMARY
REF LOG: BHCS 02/11/86
ANGLE AT TOP PERF: 21 @ 9644'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
4 0.25 9610-9654 O 10/2 9/86
4 4 9665-9704 O 6/6/86
I 9-5/8"CSG, 47#, L-80, D:8.681 Id 9855',I
]"~~ 9868'
I 9259' H 5-1/2" BAKERSFEAROUT SUB I
9250' Id ELMD- LOGGED2/14/86 J
9863'
.,,
DATE REV BY COMIVENTS
2/14/86 ORIGINAL COIVPLErlON
12/31/00 SIS-IVfWH CONVERTED TO CANVAS
'" 1/16/01 SIS-MD INITIAL REDRAW
2/13/01 -IF' CORRECTIONS
]--{(2)PADS FROM GEOPHONES(G&I)(LEFT 03/27/95)
PRUDHOE BAY UNIT
WELL: 04-17
PERMIT' No: 86-020
APl No: 50-029-21532-00
SEC26 T11N R15E 4225.9 FEL 1206.31 FNL
BP Exploration (Alaska)
Injector Sundry Review
Slow TxlA Communication: leak rate < 10 GPM
Recommended Requirements: Monthly Report
Annual MITINLLRT
CMIT TxlA 4-years
Re-submit sundry if leak rate becomes high enough to log
Well No. Date Approved Approval No. Leak Rate Current Requirements Comments
01-08 8/15/2000 300-198 1 GPM @ 2500 psi Monthly Report
Annual MITINLLRT
CMIT TxlA 4-years
11-29 02/11/98 398-035 0.1 GPM @ 2400 psi 'Monthly Report
Annual CMIT TxIA
12-02 10/20/93 93-286 MITIA's now pass Annual MITIA
12-27 10/08/93 93-269 MITIA's now pass Annual MITIA
13-09 1 GPM @ 3000 psi In progress~ submitted 06/11/01
13-18 08/15/00 300-200 4 GPM @ 1300 psi Monthly Report
CMIT TxlA 2-years
114-14 08/15/00 300-199 .7 GPM @ 2500 psi Monthly Report
LLRT 1-year
CMIT TxlA 4-years
P1-01 07/22'/98 398-188 2.4 GPM @ 3000 psi 'Monthly Report
Annual CMIT TxlA
P2-34 09/20/98 398-243 M'I'TIA Pass, 3 days to Monthly Report
equalize Annual CMIT TxlA
U-0~ 6 GPM @ 1550 psi In progress~ submitted 06/11/01
Y-03 4 GPM @ 1750 psi In progress~ submitted 03/19/01
Rapid T x IA Communication: Leak rate > 10 GPM
Recommended Requirements: Monthly Report
CMIT TxlA 2-years
,Well No. Date Approved Approval No. . .Leak Bate Current Requirements Comments
03-11 05/21/99 399-084 ,1 BPM @ 2400 psi Monthly Report
CMIT TxlA - 2 years
Note: Sundry aplication
action plan refers to an
expiration date of 5/21/01
04-17 2.5 BPM @ 400 Fsi In progress, submitted 06/11/01
04-45 07/~35~00 300-173 1 BPM @ 1300 psi Monthly Report
CMIT-TxlA 1 year
13-15 '06/16/99 ~99-091 .8 BPM @ 2900 psi Monthly Report
CMIT TxlA 2-years
S:\Wells Group\Well Integrity Eng\Sundries\lnjector Sundry Review.xls Revised: 6/12/2001
Well No. Date Approved Approval No. Leak Rate Current Requirements Comments
13-17 10/21/98 298-275 >1 BPM Monthly Report
CMIT TxlA 1-year
13-20 04/23/97 397-078 >1 BPM Monthly Report
CMIT TxlA 1-years
,
13-31 08/01/00 300-199 2 BPM @ 2325 psi Monthly Report
CMIT TxlA 2-years
14-2i 12/17/99 399-248 1 BPM @ 2500 psi Monthly Report
CMIT TxlA 1-year
LPC-02 12/15/99 399-247 > 1 BPM Monthly Report
Annual MITOA to 1500 psi
Annual LLR on IA
M-13 .25 BPM @ 2500 psi In progress~ submitted 06/11/01
P-14 02/10/00 300-038 2.6 BPM @ 1950 psi Monthly Report
Y-10 4/20/2000 300-103 1.5 BPM Monthly Report
CMIT TxlA 2-years
IA x OA communication
Recommended Requirements:
Monthly Report
CMIT IAxOA 2-years
Well 'No. Date Approved Approval No. Leak Rate Current Requirements Comments
03-10 05/09/00 300-106 1 GPM @ 2125 psi Monthly Report
MIT-T 2 years
04~0'9 06/~5/00 300-145 Rapidly Equalizes Monthly Report
CMIT IAxOA 2 years
04-13 10/26/88 8-808 I Rapidly Equalizes None
11-10 06/09/89 9~490 Rapidly Equalizes MITIA Annually
i2-23 07/11/00 300-174 Rapidly Equalizes Monthly Report
CMIT IAxOA to 2100 psi, 2
years
Production Casing Leak
Recommended Requirements: Monthly Report
Annual MIT-OA
MIT-T 4-years
Well No.' Date A. ppr0~ed Approval No. Leak Rate Current Requirements Comments ......
01-09 09/27/99 399-185 .7 BpM @ 2000 psi Monthly Report
MIT-T Annually
CMIT IAxOA 2 years
!Max IA pressure 1000 psi
A-31 01/27/00 300-008 .5 BPM @ 3000 psi Monthly Repod
S:\Wells Group\Well Integrity Eng\Sundries\lnjector Sundry Review.xls Revised: 6/12/2001
BP Exploration Alaska Inc.
Post Office Box 196612
PRB-24
Anchorage, Alaska 99519-6612
bp
June 12, 2001
Mr. Tom Maunder, P.E.
Alaska Oil & Gas Conservation Commission
333 W. 7th Ave.
Anchorage, Alaska 99501
Subject:
Summary of Current Injectors with Sundries
04-17 (PTD 186-020) Application for Sundry Approval
13-09 (PTD 181-158) Application for Sundry Approval
M-13 (PTD 180-124) Application for Sundry Approval
U-05 (PTD 184-168) Application for Sundry Approval
Dear Mr. Maunder:
Attached is Application for Sundry Approval form 10-403 for wells 04-17, 13-09, M-13
and U-05. These requests are for approval to continue produced water injection with
known tubing x inner annulus communication. A proposed Action Plan and wellbore
schematic is included for each well.
Also attached is a listing of all injectors operating under a Sundry in the Prudhoe Bay
and GPMA fields. As the number of injection wells operating under a sundry has
increased, the monitoring and test programs have evolved. To provide a consistent
approach to monitoring each well type, we have proposed standard test requirement for
4 types of problems.
If you require any additional information or clarification, please contact either Kevin
Yeager or me at (907) 659-5102.
Sincerely,
Anders, P.E.
Well Integrity Engineer
Attachments
q6¢ ~--
GeoQuest
500 w. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9930
Company:
12/15/95
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay
Floppy
Well Job # Log Description Date BL RF Sepia DIR MWD Disk
, ,
D.S. 4-8 '~ ~ J ~) INJEC PROFILE 9511 09 I 1
D.S. 4-13 -7 ~ ~ ] INJEC PROFILE 9 51 1 0 9 I 1
O.S. 4-17 ' ~' ~ ~..13 INJEC PROFILE 9 51 1 1 e I 1
D.S. 4-19 ~'Y ~/ DUAL BURST TDT-P 951112 I 1
D.S. 4-28 ~ ~: 3--~:3 INJECTION PROFILE 95111 0 I 1
D.S. 5-4 ~~' ~--'c./ PROD PROFILE 9 51 1 1 5 I 1
D.S. 9-04A ~'~-~,~ PROD PROFILE 951 1 1 0 I 1
D.S. 14-16~,~ ~1'. : PROD LOG WlTH DEFT 951107 I 1
O.S. 14-19 ST1 ~'~ ~ PROD PROFILE 951119 I 1
,D.S. 16-02 ~(~ ~,~'(~ : MI INJECTION PROFILE LOG 951119 I 1
O.S. 18-23A ~ ~ I~, LEAK DETECTION LOG 951114 1 1
......
......
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
/0
ARCO Alaska, Inc.
P.O.Box 100360
Anchorage, Alaska 995 10
DATE: 5-15-92
REFERENCE:
4-10
~o~_ ~.~ 4-17
ARCO CASED HOVF. FINALS
5.8-92 PDK-100/OR/iX~ 03orax) mm 1,
5-2-92 InJ Prof/Callper l~m 1,
5-2-92 InJ Profile Run 1,
4-30-92 Jewelry Run 1,
5-2-92 Prod Profile Run 1,
5-9-92 PDK-100/GR/ CL (Borax) Run 1,
4-29-92 Prod Profile Run 1,
5-3-92 PITS Run 1,
5-1-92 PITS Ibm 1, l~'
5-2-92 PITS ~ 1,
5-8-92 CCL (Peri) l~m 1,
Please sign and return the attached copy as receipt of data.
RECEIVED BY
Have A Nice nayl
Sonya Wallace
ATO-1529
1~¥ 2 '~ 1995 APPROVED
Trans# 92 10
Alaska O~i a Gas Cons.
# CENTRAL FILES
# CHEVRON
D&M
# EXTENSION EXPLORATION
# EXXON
MARATHON
# MOBIL
# PHH,LIPS
PB WELL FH,F~
R&D
# BPX
# STATE OF ALASKA
TEXACO
Atlas
Camco
Camco
Camco
Atlas
Atlas
C~mco
Camco
Camco
Camco
Atlas
ARCO ALA?KA, ZH.C~
P ~ C,' ~ B 0 X ~ (..':, r336
A J"'! C; H (.i F:. A G E£ A L A S' i':;~ A o ,.'::, "" i
! ..' ,.- ...:- ....
DATE· ~ ~ -~ ¢~-88
R ii:.' F:' FZ R E N C E · A R C ri C A,? E ];, H O L E F' l N A L. 3'
,..~ -- 4 ........... C C L
· ":',_ .-. i :i:3 't ~, --- ,.".~ --- ,...':::~ :.,'.::' C N i._ ----($ A N iff A
· 4 ..... i i '3 -' i "'~ .... :iii', 8 F:' F;.'. 0 D U C T i 0 N i::' R 0 i::' ]] L. I-7
· ,:i,. ..... i i i "- ~'-, - ''~,..: :.:':::' C: N L- G ~ H M fi
· 4 .... .""., i i - ...:.';' "- :..,'::' :..,':::' C i'-..! I... '"' G A H, N A
·.~.., .... ,i, ii'.': i ;'''~:, - '~, ~'~;'-"-i'3.' :i:'~ il:. N ,.J ~.iz C: T :[. 0 i'"i. ,l:' F;.: i'i .... F:' T ,...t ,_
':';'., ..... i ",:'" i '";"._. .... ~, 2 - i.:.: ','"i: .,.'r N ...i E C: i' ~.T i'1 .... N F:' R 0 F' ]; i... E
. ·
· 4 - 2'i.':' i i - 4 .... 8 8 C; iq L "- (:i A H ii fi
· 5: .... ..':"~; i i .... it:: .... 8 iii C N L. "" G A i"i H A
~ =' i :5 i i it:'. :iii:!.:; C:NL'-i]AMHA
...:. ..........
~ 9 .... 2:5 i i - 5 - 8 8 T U B .1.: N 6 C LIT '";' E Fi.'
· 9 .... ,::,"" .~ '=i ;:~... - t A. ..... - 8 :::i F:' Fi'. 0 D U C T l 0 N F:' F;.'. 0 ~:- ]: ~,.. E - (;:, ~k ri M A
· i 2. .... :5 i (3, - i 4 -.-iii: 8 i::"Fi'. 0 t) U C '[' ]: 0 N F' I:~'. 0 F: I i... i!il 3' U i:;:. V E Y
~, i 2 .... 6 i (.) -. i ,5 .... 8 8 F:' F;.'. 0 D U C 'i" ]: r-t i'~: P F;: u !::' :[ L iii
· i 2- i (i:, i (') - i 2 .... i3 ;:3 F:-' ]: T 3'
~ i z_, .... i 5 i ;'.',- i 5 .... ~ii', 8 i N it::' r" T l 0 i:,!. F:' R 0 F' i[ i_ E
® 4, .,~--., .... S 7 i. '":;.., -- ,"::; .... i .... ~::', 8 C B ";',
· i 4 .--'..'5 '7 i (:;, '- ;5 i - i-3 8 C E 'T'
tr ~, .a, --. ._"-~; q:. 'i ;:",.., - ;2; i .... 8 8 F':._ B T'
~ ,~...--"."--, ."::: i ,':", .... :'4 i' "'; "; C FZ 'i-
, , .. · ........ '°"' ,:.":
~ i 5 .... 2.5 t (:;, .... 2 ;5.-.. 8 ::'.i; C C i._ - 5 A i'd M A
II'i 6 --'7 'I (') .... 2. ?.- 8 8 F' F..' 0 r,.:, j C i" ]: 0 N F' R U F .i: L E
· i 8.-. 2 i ,"', .... '::'"'::: .... iii', 8 r'. r'-~
;.- ......... -,... ;..-
· F:' W D W :5.-- i I (.) .... i S..- 8 8 G A i"-'i H A R A Y
t::' L.. E A,? Ei: ,!i; i (:.; N A i'.-i i) R i!i: 'T' U Fi: N T H E A"I" ]" A C i:-t E D C 0 i::'"?' A,E..'
1-:..' E C: I":: ]: V liT. D B Y
i..i A V r:': Afl 'j: C: E D A Y !
D I £'T'R J' B U'F i 0 N
R I::: C i-:. i I::' T
R U N i.,
R blW i ,
I:,:Lji'.~. i ,
R Ut'..!i ,
I:;.:U i'.~ i
F(:U N i
R{JN i
I:;.:l.j i'..! i
R UN i ,
F;:. LJ N i ,
RUN i,
RUN ~,
RtJ N 'i,
F;.'. U N J.,
RUN i,
R U N i.,
F..' ~J N i,
F;.'. U t.,! { ,
F.'tJN i,
I:;.'. U N i ,
F;..'!J N i ,
Fi: U N i,
F(UN i,
I:;.: U Fi i ,
F;.'.LJNi ,
I) A 'Y' A...
5"
5"
,...:; ,,
'.5"
.5."
5"
'.5"
5"
.5"
5:"
I"' ¼
.2
5:"
,j.
,'.:': i' i... A 2
C A ri (~:
Ai" L. :::': ,S.'
A '1 i_ A
t.; A t'l t..; t..I
A 'i" L A ;9
A 'i' L. A 3'
C A H (3 0
C A M C C
A T L A 2
A T L. A
A T' 1.. A ;i-.:
AT' I... F~,i';'
C A f'i C 0
C A r'i C 0
C A i,~ C O
C A H C 0
C~MCO
5' C H
.'_-;' C H
,?;' C H
,,~, C kt~
L; A M !::: C)
C A M C.: 0
C A t'i C: 0
[] A i"i C (3
t ........ ~I,'..:--~L.. : ]:i ~t::
· il: C H E ',,/R 0 H
i.:, 6: H
:~,':.Ii.-'. X T' ii.' N ;:..'; .[ 0 N ii{: X P L (3 i:.:.: A i" i[ ('J N
~i: [': X X 0 N
H A F.'. A 'T' H (:) N
"".,,. H Ci )}:':. i[ L..
ARCO ALASKA, INC. .~
F'~O. BOX t~0560
ANCHORAGE, ALASKA ~$i~
DATE' it-10-88
REFERENCE: ARCO PRESSURE DATA
i -i t0-24-88
t -i 9 i 0-2(D-88
2-4 i 0-24-88
4 iT i()-i '~-88
4-St ~ 9-2i -88
4 32 9-°i -88
5-i i t 0-1 9-88
5-i S i 0-i 9-88
S-i ~ i ~-i 9-88
,5-i 7 i ~-'t ~-88
7-2 i 0-9-88
7-8 t ~--9-88
9-S i F~-~-88
,~ n~ 8-28-'88
9-S3 8-28"-88
i 2-S i (~-i 4-88
i 2-6 t G-i S-88
i °-i (') I 0-i '~-88
~-'~ f 0-i 9-88
i ~%-i i i ~-6-88
i ~-26 i 0-6-88
i ~-28 i ~-6-88
I 4'-i 0 7-i 0-88
i 4-i S 6-S(~-88
i 4-t 8 i u- ~-88
i 4-S2 i ~-7'-88
i ~-" i ~-8-88
i ~-i 0 t ~-9"-88
iD-iS i ~-'8-88'
i S-i 9 i ~b-8'"88
t ~-'~ I 0-t 7-oo
i S-2'.S i 0-20-88
i 6-7 i 0--22-88
PWDWS'-i i~2-iS-88
BHP--STATZC GRADIENT
BHF'--$TAi' IC GRADIEN [
BHP--STATZC GRADIENT
BHP--PRESSURE FALL-OFF
BHP--$TATIC GRADIENT
BHP--STATIC GRADIENT
BHF'--STA'i' I C GRADIENT
BHP---STAT IC GRADIENI'
BHP--STATIC GRADIENT
BHP ..... STATIC GRAI)IENT
BHP--S'I'ATI C GRADI EN'l'
BHF'--STATZC GRADIENT
BHP .... FLOWING GRADIENT
BHF'--STAI'I C GRADIENT
BHP--STATIC GRADIENT
BHF ..... FLOWING GRADIENT
BHP--FLOWZNG GRADIENT
BHP .... F'LOWING GRADIENT
BHF .... STATIC GRADIENT
BHP--STATIC GRADIENT
BHF'--STATI C GRADIENT
BHF'--STAT IC GRADIENT
BHP--F'LOWZNG GRADIENT
BHP--STATIC GRADIENT
~HF .... S'TAi" ZC GRADieNT
BHF .... STATIC GRADIENT
BHP--STATZC GRADIENT
BHF ..... STATIC GRADIENT
BHP--STATIC GRADIENT
BHF .... STATIC GRADIENT
BHF'--STATZC GRADIENT
BHF .... STATIC GRADIENT
BHF .... STATIC GRADIENT
BHP--FLOWING GRADIENT
BHP--STATIC GRADIENT
i':'LEASE SIGN AND RETURN I'HE ATTACHED COPY AS RECF. IF'T OF
A T O- i 529 ' ' ' ~ch0mgm ~
~8L, 04~
TRANS ~.~, ~, APPROVE --
CAMCO
C A M C 0
CAMCO
CAMCO
OTIS
OTIS
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
C A M C 0
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
CAM[;[)
CAMCO
CAMCO
CAMCO
CAMCO
CAMCO
!)ATA.
D I S'FR !BU'F I ON
CENTRAL FILES
D & M ¢. R & D
EXTEND'ION EXPL. ORA'i"i
EXXON ~ STAi'E OF AI_ANKA
MARAi"I-~ON ~ 'FEXACO
MOB I L
ARCO Alaska, Inc.
P.O. Box i.00360
Anchorage, Alaska
995~
DATE: Hay t3, t987
REFERENCE: ARCO Cased Hole FinaL
t-28 4-~'"°~-'-' ,,,
2-8 4-t3-87
3-9 4-1 0-8'7
· 3-22 4-t5-87
3-22 4-29-8?
· 3-25 4-t 5-87
::~;- 25 4-t 6'"87
4-t 7 4-t t-87
6-22 4-t9-'87
6'-23 4-20-87
"?-4 4-22-87
9-6 4-3-87
9"-'28 4--t 6-87
· l t '- ~ 4.-2'0-87
t I -t 0 4-t '?....8"?
t t-t.5 4-t 8-87
t 3-21 4-20-87
t 3-25 4-25--87
t 4-20 4-5-87
t 4-35 4-6-87
t 6-24 4-6-87
t 8-2 - 4-t 2-87
t8-8 4-22-'87
Ftowme1.er/CCL Run t, 5"
Leak De1../Temp/Ftowmefer Run t, 5"
Leak De1.. Run t, 5"
FLUid I.D./GR/Temp ~n I
FLop. F'.L.(CCL/GR/Temp) Run ~, 5'
F [owmefer/GR Run
Pump in Temp. Survey Run
In j. F'rofi Le Run
FLop.P.L. (CCL/GR/Temp) Run
F [op.F'.L. (CCL/GR/'remp) Run
CoLLar Log (s'ek bridge plug) Run
ColLar & Perf. Log Run
CoLLar Log(~e~ AVA &DW pack) Run
Prod. Profi Le/FLow/FLuid I.D Run
F' Lop.F'.L. (CCL/GR/Temp) Run
FLop.F'.L. (CCL/GR/Temp) Run
Inj. F'rofi [e/F'Lowme~er Run
In j. F'rof i Le/F [owme'[er Run
In j. F'rofi Le/FLowme1.er Run t,
CH CNL Run
C H C N L R u n
F[op.F'.L.(CCL/GR/Temp) Run 2,
FLowme~er/Temp/FLuid Density Run
F Lowmefer/FLuid Den~i fy Run
Please _sign ancl~1.u,~qre-J~l~e,/~-t~1.ached l=opy as rece
A l' 0.- t 5 2 9 e e k r . ~ uum~lSSlO~
A p p r o v ecl ....
DISTRIBUTION
C a fill= 0
C a mc o
Ca rdc o
C a ~m: o
3'ch
Camco
:,
C a ~d C 0
.
Sch
Gear
Gear
Gear
C a mc o
.~c h
Camco
C 8 mc o
Sch
Sch
,~ch
C a mc o
F'hi LLips;
F'B WeLL Fi Les
R & D
ARCO Alaska, Inc-~..~=,
P.0. Box t
Anchorage, A la~ka
995J ~)
DATE · February 2 5, I 987
REFERENCE' ARCO Cased Hole Final
3-14 8--23-86 CET Run t, 5'
4-i7 6-6-86 F'erf. Record Run t, 5'
4-t8 6-6-8~ Perf~ & CCL Run t, 5'
4-°t. 6-~-86 Perf~ & CCL Run
4--22 6-5-8~ F'erf. Record Run t, 5'
4-24 6-6-86 Perf. Record Run
4-27 6-4-8& F'er~ Record Run i, 5'
4-28 ~-4-86 F'erf. Record Run i, 5'
~-t2 8-7-86 CET Run i, 5'
t4-4 8-i4-86 Reperf. Record Run ~, 5'
t6-24 8-2t-86 Perf~ Record Run i, 5'
t7-1i 5-tt-86 Comple, ion Record Run l, 5'
t7-t4 8-2~-86 Add-F'erf~ Record Run i, 5'
uch
,~ch
~ ch
Sch
$ch
$ch
Sch
$ch
$ch
$ch
$ch
Please sign and re,urn ,he a~'~ached copy as receip~ of da,a.
Rece i ved By
HAVE A NICE
Ro~a~r,e Peek
ATO-I ~oo
TRAN$ ~87t27
Approved
ska Oil & 6as Cons. Gommissio~
Anchorage
$ Cen'~ral. Fi Les
· ,,--" Chevron
D & M
~ Extension ExpLoration
~ Ex xon
Mara,hon
~.~ Mob i l
ARCO Alaska, Inc.
Prudhoe Bay ~..,,gineering
Post Office Box 100360
Anchorage, A~aska 995t0~0360
Telephone 907 263 424~
Donald F, $cheve
Operations Engineering ~anager
November 17, 1986
Mr. C. V. "Chat" Chatterton
State of Alaska
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton'
Re' DS 4-17
Permit No. 86-20
Enclosed is the "Subsequent" Sundry Notice and Completion Report
detailing work completed on the above-mentioned well.
Very truly yours,
DFS/JGA-sd
Enclosure
cc- Standard Alaska Production Company
File' PI(DS 4-17)W1-3
ARCO Alaska, Inc, is ~ $ubsidia~:? of ,qii~nticRichfietdCornpany
STATE OF ALASKA .....
ALASI,,.. OIL AND GAS CONSERVATION COMN ..... SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing
Alter Casing [] Other []
2. Name of Operator 5. Datum elevation (DF or KB)
ARCO Alaska, Inc. 62' RKB Feet
3. Address
Post Office Box 100360, Anchoraqe, AK 99510
4. Location of well at surface
795' FSL, 279' FWL, Sec. 26, T11N, R15E, UM
At top of productive interval
1353' FNL, 1010' FWL, Sec. 26, T11N, R15E, UM
At effective depth
1236' FNL, 1040' FWL, Sec. 26, T11N, R15E, UM
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
DS 4-17
8. Approval number
143
9. APl number
50-- 029-21532
At total depth
1207' FNL, 1048' FWL~ Sec. 26~ T11N, R15E, UM
11. Present well condition summary
Total depth: measured 9868 feet
true vertical 8932 feet
Effective depth: measured 9782 feet
true vertical 8852 feet
Casing Length Size
Structural
Conductor 120'
Surface 3522'
Intermediate
Production 9855'
Liner
Perforation depth: measured
10. Pool
Prudhoe Bay 0il Pool
Plugs (measured)
Junk (measured)
Cemented Measured depth
20" 1814# Pol eset 120'
13-3/8" 3700 SX 3522'
True Vertical depth
9610'-9644', 9646'-9654'
true vertical
8691'-8723', 8724'-8732'
Tubing (size, grade and measured depth)
5~'", 17#, L-80 9260 'MD
Packers and SSSV (type and measured depth)
Brown 3-H P~¢ker @ 9143'MD
12. Stimulation or cement squeeze summary
Intervals treated (measured)
120'
3502'
9-5/8" 700 SX 9855' 8920'
, 9665'-9672'
, 8742'-8749'
, 9675'-9704'
, 8752'-8779'
Camco BAL-O .qSSV @ 2?IR'MI1
Not Applicable
Treatment description including volumes used and final pressure
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
0 0 5950 500
0 0 6947 500
Tubing Pressure
982
915
14. Attachments
Daily Report of Well Operations []
Copies of Logs and Surveys Run Iii
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~"¢~
=orm 10-404 Rev. 12-1-85
Title
JGA (263-4361)
Operations Enqineering Manaqer
Date
Submit in Duplicate
SUMMARY OF OPERATIONS
Began Perforating operations on 10/29/86. Shut-in well. RU perforating unit,
pressure tested equipment. RIH w/gun #1, shot interval 9636'-9654'MD (¼ spf),
POOH, all shots fired. RIH w/ gun #2 shot intervals 9610'-9632'MD and (~ spf),
POOH, all shots fired. Secured well, RD. Put well back on injection.
Depths referenced to BHCS 2/11/86
STATE OF ALASKA
ALASKA OiL AND GAS CONSERVATION COIv, MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
Water Injector
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50- 029-21532
4. Location of well at surface 9. Unit or Lease Name
795' FSL, 279' FWL, Sec. 26, TllN, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1353' FNL, 1010' FWL, Sec. 26, T13~, R15~., UM 4-17
At Total Depth 11. Field and Pool
1207' Ft~L, 1048' ~,~, Sec. 26, TllN, R15g, UM Frudhoe Bay F:[eld
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ])rudhoe Bay 0:[1 ])ool
62' RKBI ADL 28324 ALK 2322
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
01/28/86 02/10/86 02/13/86'I N/A feet MSL
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)! 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
9868'MD, 8932'TVD 9769'MD, 8840'TVD YES ~X NO [] 2218 feet MD 1850' (Approx.)
22. Type Electric or Other Logs Run
CNL/CDL/GR/Cal, CBL/GR/CCL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surf. 120 ' ' 30" 181M~ Poleset
13-3/8" 68.0¢/72.)f~ K-55/L-~;0 Surf. 3522' 17~" 3300 sx CS 111 & 400 s ~ CS 11
Performed too ~ob w/20) sx CS 11
, , 9-5/8" 47,0fA L-80 Surf, 9855' 12~" 700 sx Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
5~_ q?F,f/, 914~'
9610'-9644', 8691'-8723' ~ spf
9646'-9654', 8724'-8732' ~4 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
9665'-9672', 8742'-8749' 4 spf ...
9675'-9704', 8752'-8779' 4 spf N/^
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
lC'? .... -
Form 10-407
OGA (263-4361)
1
Submit in duplicate /~/
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
29. e
GEOLOGIC MARKERS
NAME
MEAS. DEPTH TRUE VERT. DEPTH
.....
Trunc. Top Sag 9443' 8535'
GOC 9553' 8637'
,
GOC 9576' 8659'
Base Sadlerochit 9722' 8796 '
30.
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
31. LIST OF ATTACHMENTS
32.
I hereby certify that the foregoing is true and correct to the'best of my knowledge
.,:
Oper. Engr. Mgr.
Signed ~l~J ~ ~)~ ~'¢.~'.//"~ Title
Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection,' air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, GaS'Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
AF.CO Ala.~'ka, Inc.
i::'. O. Box t 0(.>S60
Anchorage, A l a.s'l< a
995 ~ ()
I)ATE: November t 4, t986
I:~:E:F:EREN[;E:': ARCO [,a.~ed
""~i _-' E~~......~~i 0'--27'"'86 Co LL a ,"
4 .'; 7 i (-)-29.'-86 Co I. I. ar
.~.~9-..i 5 i 0-S0..-.86 Co L Lar
I.'1o I. e F:'ina I.
& F:'erf, I...og Run
6, F:'e r f, I...o g R u n
Log Run
t, 5"
t,
t, 5"
(;ear
[;ear
[;ear
I'RAN$ $86732
o f
cia fa,
DIS'TRIBUTION
· "'-.. C e n 't r a !. F i L e ~'
~".,,.ChevroY!
...'"' Ex'l:en_s i on Exp Lora't ion
JI.
,,- Ex xon
M a r a '~' h o n
~'~: Hob i I.
· "'..- F'hi I. l i p_s'
F'B Wel. l Fri le~
R & D
-,.~"S'oh i o
,.~'l'ate of ALa.,.~ka
'ir
'"'.~. 'J" e x 8 c: C)
ARCO Ala.s'l(m, Inc~
i='~0. Box t0(-)S6(')
Anchorage, AI. as'ka
99~:' t 0
DATE' October ~S ,t986
RFF:'ERENCE' ARCO Ca~'ed HoLe FinaL
4-t7 9-26-86 ]:nj. Profi Le Ru¥; ~, 5"
5-6 t£)-~-86 Produc't'ion Profi I.e Run t, 5"
9-24 ~:).. .... ~....,.~ o,,~. Produ. ction Profi L~.. Run ~, 5'
9-29 ~/3-4/86 Spinner Log Run ~, 5'
tS.-.S2 9-...27-86 Temp, Log Run t, t"
t6-4 °-';~'-86, ~._, FI. owme'~'er/GR/Capaci'~'ance L. og Run
t6-tt t~-~-.q"-..q~ ,.~ In j, F'rofi Le R. un
i8-8 t~-4-86 gamma Ray Run 1,.,':~"
t8-9 t0-t-.°A,,_ X-Y CaLiper Run t, ~'.,"
F'l. ea.,.~e sign and re~u. rn l'he a't't'ached copy as receip'~ of dat'a,
l:i'.eceived By ................................................
HAVE A NICE DAY!
i.i'o s' a ¥'~ne F'eek
ATO- ~ ~:'~":;'
.! ~;.
'fRANS ~:866:35
D I ST I:. 1 BUT I (:.tN
· ,-~'Central. F'i Les'
'~'-.-CJ"i evl"
D & M
'"'~ Ex'l.'en~_ion ExpLc)ration
-.. [:-X X on
Mara ~hon
'"' Mol:, i L
· i/' .
· '".,. Phi I. !. il::, ..-T
PB WeLl. Fi Les'
R & D
S'oh i o
'U'
· ~: ~?~a~'e of ALas'l,,a
¢ Texaco
? '~ ..2~ (')
DA"f'IE' Oc -t: ot:) e~- 9,
l:;:EF:'li!:F;:lii:NClii:' AI:~CO
4"" t '7 9 .... ~..."~8'-'86
t 986
I::' ¥' e ~:; .S' U 1" .r..::, ID a '[' a
I::'a I. !. o 1'" f
F' 1. e a s'e :.~ i g n a n (:1 'r' e -.1: u :: c e i p t'
F;.'.o s' a n n e Peek
ATO .... t 529
1'RAN ~.," 4',:86628
o f d a t'a,
D I S' T R I B U T I 0 N
C e n 'f ~- a i. F' i i.e.'.;
Chevy-on
-~- D & M
F x t e n ~ i o n I:'-: x p [ o ~- a ~' i o n
'"' E x x o n
Ma 'r'a -!: hon
..-'"' Mob i [
· *' Phi L Lips
-ir
PB We L L Fi Les'
-"- R & D
'"' ~oh io
'11'
· ~ Ytate of AI.a~;ka
~' T e x a c o
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION .-~;~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
Water Inj ecto?
OIL GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P.O. Box 100360, Anchorage, Alaska 99510 50- 029-21532
4. Location of well at surface 9. Unit or Lease Name
795' FSL, 279' FWL, Sec. 26, TllN, R15E, UM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1353' FNL, 1010' FWL, Sec. 26, Ti]N, R15E, UM 4-17
At Total Depth 11. Field and Pool
1207' FNL, 1048' FWL, Sec. 26, TllN, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay Oil Pool
62' RKBI ADL 28324 ALK 2322
12. Date Spudded 13. DateT.D. Reached 14. DateComp.lSusp. orAband. ,15. Water Depth, ifoffshore ,16. No. of Completions
01/28/86 02/10/86 02/13/86-I IN/A feet MSL
17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD} 19. Directional Survey I 20. Depth where SSSV set I 21. Thickness of Permafrost
9868'MD, 8932'TVD 9769'MD, 8840'TVD YE~ NO []I 2218 feet MDI 1850' (Approx.)
22. Type Electric or Other Logs Run
CNL/CDL/OR/Cal, CBL/OR/CCL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED
,,
20" 91.5~A H-40 Surf. 120 ' ' 30" 1814~ Poleset
.... 13-3/8" ½8.05A/72.0~A K-55/L-80 Surf. 3522' 17~" 3300 sx CS 111 & ~OO sx '.S 1]
Performed tnn iob w/200 Ix CS ll
9-5/8" 47.05A L-80 Surf. 9855' 12¼" 700 sx Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
5~ 9260'
9665'-9672'~ 8742'-8749' 4 spf
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9675'-9704' 8752'-8779' 4 spf
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
._. N/A
27. PRODUCTION TEST
Date First Production ] Method of Operation (Flowing, gas lift, etc.)
Date of Test HOurs Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD I~
OIL-BBL GAS-MCF WATER-BBL OIL GRAvITY-APl (corr)
Flow Tubing Casing Pressure CALCULATED
Press. 24-HOUR RATE I~
28. CORE DATA
Brief descriPtion of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
~:~s Cons,
Form 10-407 ~,/,M Submit in duplicate
Rev. 7-1-80 -~J L~/~r CONTINUED ON REVERSE SIDE
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Trunc. Top Sag -~ 9~3' 8535'
GOC 9553' 8637 '
GOC . 9576' 8659'
·
Base Sadlerochit .9722' 8796'
·
...
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is t~Ue and correct to the best of my knowledge
.
Signed ,- _ :~ Title Date v
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
STATE OF ALASKA
ALASr. A OIL AND GAS CONSERVATION COMI,,SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown []
Alter Casing [] Other []
2. N.a~m~e,.o f..O per, ato r
AKUU AlaSKa, Inc.
Stimulate [] Plugging [] Perforate [] Pull tubing
3. Address
Post Office Box 100360, ^nchoraqe, AK 99510
4. Location of well at surface
795' FSL, 279' FWL, Sec. 26, TllN, R15E, UM
At top of productive interval
1353' FNL, 1010' FWL, Sec. 26, T11N
At effective depth
1236' FNL, 1040' FWL, Sec. 26, T11N
At total depth
1207' FNL, 1048' FWL, Sec. 26, T11N
11. Present well condition summary
Total depth: measured
true vertical
, R15E, UM
, R15E, UM
, R15E, UM
9868
8932
5. Datum elevation (DF or KB)
62' RKB
Feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
DS 4-17
feet
feet
Effective depth: measured 9782 feet
true vertical 8852 feet
8. Approval number
143
9.
APl
n(~-e¢; 1532
50--
10. Pool
Prudhoe Bay 0il Pool
Casing Length Size
Structural
Conductor 120' 20"
Surface 3522' 13-3/8"
Intermediate
Production 9855' 9-5/8"
Liner
Perforation depth: measured
true vertical
Plugs (measured)
Junk (measured)
Cemented
Measured depth
1814# Poleset
True Vertical depth
3700 SX
700 SX
9665'-9672'
8742'-8749'
Tubing (size, grade and measured depth)
5½", 17#, L-80 9260 'MD
Packers and SSSV (type and measured depth)
,9675'-9704'
,8752'-8779'
120' 120'
3522' 3502'
9855' 8920'
Brown 3-H Packer @ 9143'MD Camco BAL-O SSSV @ 2218'MD
12. Stimulation or cement squeeze summary
Not Applicable
Intervals treated (measured)
Treatment description including volumes used and final pressure
13.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
RECEIVED
AUG 1 8 1986
Alaska Oil & G~s Cons. commission
Anchorage
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
0 0 0 0 0
0 0 6710 10 767
14. Attachments
Daily Report of Well Operations ~ Copies of Logs and Surveys
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
:orm 10-404 Rev. 12-1-85
JGA (263-4361)
Title Operations Engineering Manager
Date .~¢,~ i
Submit in Duplicate
SUMMARY OF OPERATIONS
Began Perforating operations on 6/6/86. RU perforating unit, pressure tested
equipment. RIH w/gun #1, shot interval 9685'-9704'MD (4 spf), flowed well to
cleanup. Shut-in well, POOH, all shots fired. RIH w/ gun #2 shot intervals
9675'-9685'MD and 9665'-9672'MD (4 spf), flowed well to cleanup. Shut-in well,
POOH, all shots fired. Secured well, RD. Put well on injection 8/11/86.
Depths referenced to BHCS 2/11/86
ADDENDUM
WELL:
2/18/86
4-17
Rn CBL/GR/CCL f/9756'-9300'. Re-rn f/9756'-8000'. Rn
gyro f/9700'-surf.
Drilling Superintendent
z bRte
~-. STATE OF ALASKA ---
ALASF. OIL AND GAS CONSERVATION COMIk 31ON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ~ Suspend ,'~ Operation Shutdown ~ Re-enter suspended well !' Alter casing !
Time extension ~ Change approved program~ '~ Plugging [] Stimulate ~ Pull tubing~;r~ Amend order ~-~ Perforate .~X. Other
2. Name of Operator 5. Datum elevation (DF or KB)
ARCO Alaska, ]:nc. 62' RKB feet
3. Address 6. Unit or P,.ropg[ty n
Post Office Box 100360, Anchorage, AK 99510 vruanoea~a~/ Unit
4. Location of well at surface
795' FSL, 279' FWL, Sec. 26, T11N, R15E, UH
At top 'of productive interval
1353' FNL, 1010' FWL, Sec. 26, T11N, R15E, UM
At effective depth
1236' FNL, 1040' FWL, Sec. 26, T11N, R15E, UH
At total depth
1207' FNL, 1048' FWL, Sec. 26, T11N, R15E, UM
7. Well number
BS 4-17
8. Permit number
86 -20
9. APl number
50-- 029-21532
10. Pool
Prudhoe Bay Oil Pool
tl. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
9868 feet
8932 feet
9782
8852
feet
feet
Plugs (measured)
Junk(measured)
Casing Length
Structural
Conductor 120'
Surface 3522'
Intermediate
Production 9855'
Liner
Perforation depth: measured
NONE
true vertical
NONE
Tubing (size, grade and measured depth)
5½" 17# L-80 9260 'MD
Size
20"
13-3/8"
9-5/8"
Cemented Measured depth True Vertical depth
1814# Poleset 120' 120'
3700 SX 3522' 3502'
700 SX 9855' 8920'
Packers and SSSV Itvl:::)e and measured,.d.ej::)th)..amCOMDC
Brown 3-H l~acker @ 9143 BAL-O SSSV @ 2218'MD
12.Attachments
Description summary of proposal ~ Detailed operations program '~ BOP sketch
13. Estimated date for commencing operation
June 15, 1986
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby,~)ertify that.,t~e [oreg.~ng is true and correct to the best of my knowledge
~f/~j~/~/~//~¢/'J Title Operations Engineering Manager
Signed
Commission Use Only
Conditions of approval
Approved by
Notify commission so representative may witness I ApprovalNo. Plug integrity ~ BOP ~st~ ~.-Locati°n clearanceI
[~,,,~[ ~~ --by order of
Commissioner the commission Date
Form 10-403 Rev 12-1-85 Submit in triplicate
ARCO Alaska, Inc. proposes to perforate DS 4-17 at selected intervals within
the Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be
flowed for clean-up. All wireline work will be done through a 5000 psi WP
BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The
SSSV will be installed at the conclusion of the perforating and clean-up
operation.
Ref- BHCS 2/11/86
Proposed Perforation Intervals'
9610' - 9644'
9646' - 9654'
9665' - 9672'
9675' - 9704'
.... STATE OF ALASKA '-'
ALASKA ~JIL AND GAS CONSERVATION C~,,vlMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE I~x
WATER
INJECTOR
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21532
4. Location of well at surface 9. Unit or Lease Name
795' FSL, 279' FWL, Sec.26, TllN, R15E, UM ~q~- Prudhoe Bay Unit
At Top Producing Interval ~ VF_~I~?~D~ ~ 10. Well Number
1353' FNL, 1010' FWL, Sec.26, T11N, R15E, UN~ "~3,,,,!.I 4-17
At Total Depth_ . ~"~LI,Sur~'~*~ 11. Field and Pool
1207'
FNL, 1048' FWL, Seco26, T11N, R15E, UN ~ Prudhoe Bay
Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Oi 1 Pool
62' RKB ADL 28324 ALK 2322
__
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions
01/28/86 02/10/86 02/13/86* N/A feet MS LI 1
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
9868 'MD ,8932 'TVD 9769 'MD ,8840 'TVD YES ~( NO []] 2218 feet MD 1850' (Approx)
22. Type Electric or Other Logs Run
CNL/CDL/GR/Cal, CBL/GR/CCL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91 .5# H-40 Surf 120' 30" 1814# Poleset
13-3/8" 68.0#/72..)# K-55/L-(10 Surf 3522' 17-1/2" 3300 sx CS Ill & 400 sx CS II
Performed top job w/200 sx CS II
9-5/8" 47.0# L-80 Surf 9855' 12-1/4" 700 sx Class G
_
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None 5-1/2" 9260' 9143 '
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD I~
Flow Tubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~I~
"' 28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None ..
,
:
Form 10-407 NOTE: Tubing was run 3/31/86. DAM2/WC36 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
GEOLOGIC MARKERS FORMATION TESTS
NAME .. Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Trunc.TopSadl eroc~ t 9443 ' 8535' N/A
GOC 9553 ' 8637 '
GOC 9576' 8659 '
Base Sadlerochit 9722' 8796'
3'1. LIST OF ATTACHMENTS
Well History (completion details), Gyroscopic Survey (2 copies)
32. I hereby certify that the fore§oin§ is true and correct to the best of m¥ knowled§e
Signed
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
ali types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (wh~re not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
AtlanticRichfleldCompa,,y
Dally Well History-Final Report
Ina]malices: Prepare and submit the "Final Rel=e~" on the first Wednesday after allowable has been assigned or well Is Plugged, Abandoned. or Sold.
"Fiaal Repe~l' should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not
required upon completion, report completion and representative test data in blocks provided. The "Final ReVe~t" form may be used for reporting the entire
operation if space is available.
District ICounty or Perish
I
Alaska
Field ILease or Unit
I
Prudhoe Bay
Auth. or W.O. no. ITItle
I
AFE 8O/,O29
Ol~retor
ARCO Alaska, Inc.
Spudded or W.O. begun
Complete
Date and depth
aa of 8:00 a.m.
3/27/86
thru
3/31/86
North Slope Borough
ADL #28322
Completion
IAccounting cost center code
State
Alaska
IWell no.
/,-17
AP1 50-029-21532
[A.R.¢o. W.I. Fore, number of wells (active or inactive) on thlsj
~ost center prior to plugging and
2 !. 66% ~bendonment of this well
3/27/86 / 2300 Hfs,
Complete reoord for each d~/ reported
9-5/8" @ 9855'
9782' PBTD, RR
Diesel
Accept rig @ 2300 hfs, 3/27/86. ND tree, NU & cst BOPE. RU
DA, rn 8.5" gase ring/JB, POOH. Cbs rams to 3~" &tst. RIH
w/3½" DP, drl FC + 10' cmt to 9782', tst csg to 3000 psi, rev
circ & filter fluid, POOH, LD 3½". RU & rn 220 its, 5½", L-80,
17~, AB MOD 8RD tbg. Drop ball, set pkr. ND BOPE, NU &tst
tree to 5000 psi. RR @ 0230 hrs, 3/31/86.
3H Pkr @ 9143', SSSV @ 2218', TT @ 9260'
Old TD
INew TO ]PB Depth 9782 '
Date [Kind of rig
3/31/86 I Rotary
Type completion (single, dual, etc.)
Single
Released rig
0230 Hrs.
Classifications (oil, gal, etc.)
Producing method
Potential test data
Official reservoir name(s)
Sadlerochit
Well no. Date Reservoir Producing Interval Oil or gas Test time Production
011 on test Gas per day
Pump size, gPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
above is correct
For form preparation a~l distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
Date ] Title
4/17/86
Drilling Superintendent
,? ,::: h
(} .,-'..'! f!'I :.:::
- STATE OF ALASKA ..... ~
ALASKA OIL AND GAS CONSERVATION COIwMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIt [] GAS [] SUSPENDED E~x ABANDONED [] SERVICE [] WATER INJECTOR
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 029-21532
4. Location of well at surface 9. Unit or Lease Name
795' FSL, 279' FWL, Sec.26, T11N, R15E, UH Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
To be submitted when gyro is received. 4-17
At Total Depth 11. Field and Pool
To be submitted when gyro is received. Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i ] Pool
62' RKBJ ADL 28324 ALK 2322
I --I-i6' N°' °f C°mpleti°ns
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore
01/28/86 02/10/86 02/1 3/86 N/A feet MS L N/A
17. Total Depth (M D+TVD)9868 'MD 18. Plug Back Depth (MD+TVD)9769 'MD YES19' Directional Survey~( NO [] I 20. Depth where SSSV setN/A feel MD I21' Thickness °f Permafr°stl 850 ' (Approx)
22. Type Electric or Other Logs Run
CNL/CDL/GR/Cal, CBL/GR/CCL, Gyro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surf 120' 30" 1814# Poleset
13-3/8" 68.0#/72.)# K-55/L-.10 Surf 3522' 17-1/2" 3300 sx CS III & 400 sx CS II
Performed top job w/200 sx CS II
9-5/8" 47.0# L-80 Surf 9855' 12-1/4" 700 sx Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None N/A
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
N/A
27. N/A PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
--
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OIL RATIO
TEST PERIOD I~
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
RECEIVED
APR 1 6 1986
~ Oil & ~a, Cons. Commission
Form 10-407 DAM/WC87
Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
I
L
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
To be submitted wtien gyro is rece?ved. N/A
;
31. LIST OF ATTACHMENTS
Well Hi story
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ Title Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and Icg on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24' If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23,: Atti]ched,~s.~. p~emental recOrds for this well should show the details of any multiple stage cement-
ing an~.th~ i~c'~l:ibni Q~ ~1~e cementing tool.
Item 27;. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, ~'§;injeCtibn;~Shut-in, Other-explain. none'''
.-~-Form 10-407
ARCO Oil and Gas Company~,'"
Well History - Initial Report- Daily
Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started,
Dally work prior to spudding should be summarized on the form giving inclusive dates only.
District
Alaska
Field
Prudhoe Bay
JCounty. parish or borough
North Slope Borough
iLease ADL #28322
or
Unit
JTitle Drill
Jstate
Alaska
Well no.
4-17
Auth. or W,O. no.
AFE 804029
Rowan 33 API 50-029-21532
Operator
ARCO Alaska, Inc.
Spudded or W.O. begun JDate
SpUdded J 1/28/86
Date and depth
as of 8:00 a.m.
1/28/86
1/29/86
1/30/86
1/31/86
2/01/86
thru
2/03/86
Complete record for each day reported
JHour ·
0300 hfs
20" @ 120'
450', (360'), Drlg
Wt. 8.7, PV 23, YP 38, PH 9.0, WL --, Sol 4
Accept rig @ 0200 hrs, 1/28/86. NU diverter sys.
0300 hrs, 1/28/86. Drl to 450'.
20" @ 120'
2150', (1700'), Drlg
Wt. 9.4, PV 28, YP 40, PH 9.25, WL --, Sol 9
Drl 17½" hole to 2150'.
ARCO w.,. 21.66%
Prior status if a W.O,
Spud well @
20" @ 120'
2691', (541'), POOH w/fsh
Wt. 9.4, PV 20, YP 39, PH 9.0, WL 14.4, Sol 10
Drl & jet f/2150'-2691', twisted off. TIH w/OS & guide, tag
fsh, unable to latch on, POOH. TIH w/bent DP & OS; unable to
locate fsh. TIH w/OS, guide, bent DP, latch & pull fsh free,
POOH w/fsh, hole tight @ 2550', wrk pipe.
2636', 3.2°, N42.3E, 2635.93 TVD, 4.1VS, 3.7N, 1.5E
20" @ 120'
2952', (261'), DD
Wt. 9.5, PV 20, YP 34, PH 9.0, WL 14.2, Sol 8
Fin POOH w/fsh. CO BHA, TIH, wsh & rm 2511'-2691', jet & drl
to 2936', DD to 2952'.
2729', 6.1°, N42.3E, 2728.63 TVD, 11.24 VS, 9.17N, 6.49E
2886', 10.3°, N32.3E, 2884.03 TVD, 33.63 VS, 26.99N, 20.06E
13-3/8" @ 3522'
4644', (1692'), Drlg
Wt. 9.2, PV 7, YP 7, PH 9.0, WL 11.6, Sol 5
Drl & surv to 3540', short trip, CBU, POOH. RU & rn 87 its,
13-3/8", 72#, L-80 & 1 its, 13-3/8", 68#, K-55 BTC csg w/FC @
3440', FS @ 3522'. Cmt w/3300 sx CS III, followed by 400 sx CS
II. Displ using rig pmps, bump plug. CIP @ 0930 hrs, 2/1/86.
ND diverter sys. Pmp 200 sx CS II top job. NU & tst BOPE.
RIH w/12-1/4" BHA to 3438', tst csg to 2000 psi. DO flt equip,
cmt + 10' new hole. Conduct formation tst to 13.8 ppg EMW.
Drl & surv to 4644'.
3060', 10.0°, N22.3E, 3055.28 TVD, 64.23 VS, 54.37N, 34.20E
3480', 20.0°, Nll.3E, 3460.69 TVD, 171.23 VS, 158.07N, 63.77E
3910', 22.1°, N23.3E, 3865.21TVD, 316.67 VS, 295.66N, 110.99E
4187', 29.0°, N28.3E, 4114.95 TVD, 435.38 VS, 404.18N, 161.02E
The above is correct
Signature
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
2/21/86 JT~t,e
Drilling Superintendent
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion.
IState
District
Alaska
North Slope Borough
County or Parish
Field Lease or Unit
Prudhoe Bay ADL #28322
Date and deptl~ Complete record for each day while drilling or workover in progress
as of 8:00 a.m,
Alaska
Well no.
4-17
2/04/86
2/05/86
2/06/86
2/07/86
2/08/86
thru
2/10/86
2/11/86
13-3/8" @ 3522'
5369', (725'), TIH
Wt. 9.4, PV 14, YP 7, PH 9.0, WL 7.4, Sol 7
Drl & surv 12¼" hole to 5369'.
4671', 37°, N18.3E, 4511.57 TVD, 710.60 VS, 658.36N, 269.14E
5289', 33.3°, N10.3E, 5011.86 TVD, 1071.89 VS, 1010.63N, 354.44E
13-3/8" @ 3522'
6490', (1121'), Drlg
Wt. 9.3, PV 10, YP 5, PH 9.5, WL 7.0, Sol 6
Drl & surv 12¼" hole. to 6490'.
5604', 33.3°, N10.3E, 5275.13 TVD, 1243.19 VS, 1180.78N, 385.36E
5912', 32.9°, NiO.3E, 5533.15 TVD, 1409.80 VS, 1346.27N, 415.44E
13-3/8" @ 3522'
7234', (744'), Drlg
Wt. 9.4, PV 9, YP 4, PH 9.5, WL 5.8, Sol 7
Drl & surv 12¼" hole to 7234'.
6403', 33.1°, Nll.3E, 5944.47 TVD, 1675.71VS, 1609.66N, 465.69E
6765', 33.6°, N12.3E, 6245.99 TVD, 1874.78 VS, 1805.75N, 506.64E
7074', 33.9°, N12.3E, 6502.49 TVD, 2046.14 VS, 1974.14N, 543.36E
13-3/8" @ 3522'
8152', (952'), Drlg
Wt. 9.5+, PV 10, YP 4, PH 9.0, WL 6.8, Sol 8
Drl & surv 12¼" hole to 8152'.
7468', 33.8°, Nll.3E, 6829.87 TVD, 2263.95 VS, 2188.69N, 588.18E
7773', 33.8°, N10.3E, 7083.32 TVD, 2432.21VS, 2355.35N, 619.98E
13-3/8" @ 3522'
9730', (1578'), Drlg
Wt. 10.0, PV 16, YP 6, PH 10, WL 5.8, Sol 11
Drl & surv 12¼" hole to 9730'.
8111', 33°, N10.3E, 7365.50 TVD, 2616.50, 2538.42N, 653.24E
8590', 32.2°, Nll.25E, 7769 TVD, 2869 , 2791N, 697E
8839', 30.8°, N13.3E, 7982.21TVD, 3000.07, 2918.06N, 726.66E
9504', 21.5°, N17.3E, 8581.24 TVD, 3287.06, 3194.30N, 805.37E
13-3/8" @ 3522'
9868', (138'), Logging
Wt. 10.2, PV 18, YP 9, PH 9.5, WL 6.6, Sol 13
Drl to 9868', 20 std short trip, wrk tight spot @ 9670', rm
9800'-9868', C&C, TOH. RU DA, log GR/ACC/DIFL; tl stopped @
9826' WLM.
9780', 18.9°, N15.3E, 8840 TVD, 3382 VS, 3286N, 832E
The above is correct
Signature .,, . 'lDate
For form preparation and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
Title
2/21/86 Drilling Superintendent
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2)
on Wednesday of the week Jn which oil string is set. Submit weekly for workovers and following setting of oil string until completion.
District
Alaska
North Slope Borough
J County or Parish
Field ILease or Unit
Prudhoe Bay I ADL #28322
Date and depth Complete record for each day while drilling or workover in progress
as of 8:00 a.m.
State
Alaska
JWell no.
4-17
2/12/86
2/13/86
13-3/8" @ 3522'
9868', (0'), TOH, LD DP
Wt. 10.2, PV 18, YP 10, PH 9.0, WL 7.0, Sol 14
Log #2, CDL/CNL/GR/CAL to 9830', RD DA. TIH, rm 9750'-9868', 20
std short trip, C&C, TOH, LD DP.
9-5/8" @ 9855'
9868', (0'), Make final cut on 9-5/8"
Cln'g pits
RU & rn 226 jts, 9-5/8", 47#, L-80 BTC csg w/FS @ 9855', FC @
9769'. Pipe stuck 13' off btm. Cmt csg w/700 sx Cl "G" w/5%
KC1, .5% D-31, 1.2% D-19, .05% R-5 & .2% D-6. Displ'd w/9.4 ppg
brine, bump plug. CIP @ 0200 hrs, 2/13/86. ND BOPE.
The above is correct
~,~.~ JDate
For form preparation and distribution J
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
2/21/86
Drilling Superintendent
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire
operation if space is available.
Accounting cost center code
District County or Parish ]State
Alaska North Slope Borough I Alaska
Field
Prudhoe Bay
Auth. or W.O. no. Title
AFE 804029 Drill
Rowan 33 API 50-029-21532
Lease or Unit I Welt no.
ADL #28322I 4-t7
Operator
ARCO Alaska, Inc.
Spudded or W.O. begun
Spudded
A.R,Co. W.I.
21.66%
Date
1/28/86
I otal number of wells (active or inactive) on this
cst center prior to plugging and I
bandonment of this well
our I Prior status if a W.O.
I
0300 hrs.
Date and depth Complete record for each day reported
as of 8:00 a.m.
2/14/86
9-5/8" @ 9855'
9769' PBTD, RR
Set pack-off. NU BOPE, TIH, displ well w/30 bbl diesel cap.
Chg rams. ND BOPE, NU tbg spool & master vlv. Tst pack-off to
3800 psi & tree to 5000 psi. RR @ 1700 hrs, 2/13/86.
Old TD
New TD
PB Depth
9868' 9769'
Released rig Date Kind of rig
1700 Hrs. 2/13/86 Rotary
Classifications (oil, gas, etc.) Type completion (single, dual, etc,)
Oil ISingle
Producing method I Official reservoir name(s)
Flowing I Sadlerochit
Potential test data
Well no. Date Reservoir Producing interval Oil or gas Test time Production
Oil on test Gas per day
!Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
The above is correct
, IDate Title
si~ ~~ ~ ~'~, C-~O'X~~'f~k 2/21/86 Drilling Superintendent
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
Mr. Randy Ruedrich
ARCO Alaska, Inc.
P. O. Box 360
Anchorage, Alaska
99510
April 4, 1986
Re: Our Boss Gyroscopic Survey
Job No. AK-BO-60011
Well: DS 4-17
Field: Prudhoe Bay
Alaska
Survey Date: February 17, 1986
Operator: T. McGuire
Mr. Ruedrich:
Please find enclosed the "Original" and one (1) copy of our
Boss Gyroscopic Survey on the above well.
Please note that a magnetic tape of the survey will be sent
to Standard AK Prod. Co. as per request of Jo Ann Gruber.
Thank you for giving us this opportunity-to be of service.
Sincerely,
NL SPERRY-SUN, INC.
Ken Broussard
District Manager
Enclosures
NL Sperry-Sun/N L Industries, Inc.
P.O. Box 190207, Anchorage, Alaska 99519-0207, Tel. (907) 522-1737
ARCO ALASKA, INC.
DS 4-17
SPERRY-SUN WELL SURVEYING COMPANY
ANCHORAGE ALASKA
ALONG CLOSURE
COMPUTATION DATE
FEBRUARY 17, 198~
DATE OF SURVEY FEBRUARY
BOSS GYROSCOPIC-
KELLY
OPERATOR~I
PAGE '!..
17, 1986
~.00 FT.
TRUE SUB. SEA [:OURSE [:OURSE DOG-LEG TOTAL
MEASURED VERTICA~ ..~;~C~E---~NCLINATIO~I-~i-O~--~'~~- RECTANG~AR .COORD~~ii:~:..VERTICAL
DEPTH DEPTH '~~H.,~,~,?,:.:.:~:.:~:~ BEG MIN DEGREES DEG/IO0 NORTH/SOUTHE~O~~~?:'"'? ...... ~"~"~'~'"'*':':" SECT. I..~
0~-0 ......... N- .... D"J--O---E 0-;-00'
0 18 S 7. 0 E 0.30 0.2~
0 19 S 3.50 E 0.04 0.81
'0 ~ ...... $ !-~", ~9W O. 13 1 . 40
0.02 2.02
0.03 2.66
3.20
3.58
3.84
4, Ol
4.1~
4.26
4.48
4.88
5.44
0.19
0.11
0.12
;0"02
0"0.4
O, 06
O;SO'
O. 08
O. 29
O. O0 ~. O0
O. 03 E -0.25
O. 08 E -0.77
· 0.01 ' E - 1 .
O. 19 W -2.01
O. 40 W -2.68
O. 52 W -3.23
O. 62 W -3.4,3
O. 83 W -3.93
1 ' 07 W -4. !~
1.27 W -4.34.
1.38 w -4.~,
1.04 W -4.60
0.23 W -4.80
O. 44 E -5.19
0.89 E -5. '~
1.43 E -6. ,. ~.
2.20 E
O' 0;-00 -E,2-;O0
1 O0 100. O0 38. O0
200 200. O0 138. O0
' .' 300 300. O0 238,'00
· ,.
.:::' 400: 399. ~9 337' ~9
500 · 499.99 437.99
600 ...... 599, 9-9' 537", 99
700 699.99 637.99
1099.99
"'1199.'99-
1299.98
1399.98
1499.97
!~99.97
i~99- 95
800
:900
: ! 000
1 lO0
1200
1300
1400
1~00
1600
: :'::'~ '~ :':::/':':::?:: '::I'700
0 22 S 1.8.:!0 W
0 24 S 19.10 W
0---1-4--"' S 1.19 W
0 13 S 27.19 W
737.99 0 10 S 57.69 W
837' 99 0 10 S 50' 80' W
937.99 0 $ $ 54,10 W
1037.99 0 3 S 45. 0 W
1'1'37' 99 O- 28 .... S 63' 19 'E
1237.98 0 33 S 64.80 E
1337.98 0 28 S 33.10 E
1437,971 0 32 '
1537.97 0 48
1637'95 1 &
27'19' E 0"'~ & "2i $
27'50 E 0'27 7,26 S
· 0: :.::.::, .:.:. e:'::~4., :s..
1800 1799.92 1737.92
1900 1899.86 1837.85
2000 1999.80 1937.80
2100 2099.75 2037.75
2200 2199.72 2137.72
2300 2299.71 2237.71
2400 '2399'.71 '2337.71
2500 2499.71 2437.71
2600 3599.66 2537.66
2700 2~99.42 2~37.42
2800 2798.83 273~.83
2900 2897.17 2835.17
1 43
2 6
2 6
1
0
0
28
58
10
10
24
28
21
55
27.10 E 0.61
26.10 E O. 39
26.19 E O. 03
15'50 E 0.72
9.69 E 0.51
. ' ::::::::::::::::::::::::::::
24.39 E O. 34
58.50 E .~.::.!:'.,,~..~: O. 28
73. 0 E'~ ...... : ~:72.10
58. &O ~:~~:~. 02
46.60 :::;:?:::::::::::::::::::: e9
10.94 S 3.34 E -9.88
13.92 S 4.83 E -12.45
17.23 S 6.45 E -15.30
20.12 S 7.61 E -17.85
22.19 S 8.09 E -19.75
2'3.18 S 8.26 E -20.68
23.20 S 8.34 E -20.68
22.88 S 8.70 E -20.29
22.07 S 11.07 E -18.95
19.00 S 17.12 E -14.58
11.76 $ 27.21 E -5.24
0.64 S 39.99 E 8.51
ARCO ALASKA
DS 4-17
PRUDHOE BAY
INC.
VERTICAL SECTION CAi
TRUE
' MEASURED V£RT'I C~-£--
~PTH DEPTH
SPERRY-SUN WELL SURVEYING COMPANY__.
ALONG CLOSURE
ANCHORAGE ALASKA
COMPUTATION DATE
FEBRUARY 17, 1986
COURSE COURSE
ION . IRE~TI--O.N'
DEG MIN DEGREES
DOG-LEG
DEO/1 O0
DATE OF SURVEY FEBRUARY 17,
BOSS GYROSCOPIC
dOB
KELC¥
OPERAT~-T
TOTAL
1986
O0 FT,.:
3000~ ~5 ;4-~ .......... 2933. -4-6'
31 O0 3093.76 3031 · 76
3200 3191.51 3129.51
3400 3384.75 3322.75
3500 3480.68 3418.68
3600 3575.98-----~;98
3700 3670.76 3608.76
3800 3765.23 3703.23
1-0-'-=3~ ..........
10 41 N 17.60 E
13 36 N 19.30 E
'15 45 N 9.19 E
17 0 N 15.10 E
I8 1-4 ...... N-I'8~-5~E
18 57 N 19.39 E
19 18 N 19.50 E
4000 3951.18 3889,18 23 I0
4100 4042.18 3980.18 25 49
'4200-----ZF130.61" 4068~-~1--- .......... ~ .....~ .....
4300 4216.29 4154.29 32 13
4400 4299.40 4237.40 35 21
N 21.69 E
N 25.80 E
N 28. ~rO--E
N 27.80 E
N 24.19 E
4500------4380..-35 ..........
4600 4460.27 4398.27
4700 4539.
z~80-0 4618.
4900 4698.
5000 4778.
5TO0-~- 4859.
36 ...... 3-4:--~N-'20. 0 E
37 18
50 4477.50 37 52
~-I ...... --455r&¥-~--1 37 .... 3AF---
12 4636.12 37 4
08 4716.08 36 44
I~ ---~797.19 -- 34 50
N 19.19 E
N 16.60 :E
N 16.10 E
N 12.10 E
N 9.89 E
N 7.30 E
2.84
2.93
1.34
2.08
O. 77
O. 35
2.'66
1.29
3.14
4.18
2.44
3.71
2.
0.87
0.43
2.47
1.36
2.43
1-3~--40--N 5i. 69 E
29.97 N 59.51E 42.77
49.93 N 66.21E 63.73
~~-N 73'19-"E ~8-~ ....
99.83 N 78,46 E 115,11
127.36 N 84,44 E 143.28
I5~.~2-N 93.22"~ ................. I'7~K.-'~8~
186.48 N 103.58 E 205.22
217.39 N 114.50 E 237.80
250'37 N "I2&.'76-'E ~..-7'I~
286.04 N 140,78 E 310.64
323.95 N 157.54 E 351.37
365.41 N ......... 178,89-'E' 3~6.~2 -
410.84 N 203.18 E 446.40
460.83 N 227.48 E 500.61
515.22 N .... 2~-'~-.'54-E .......... -558~.
571.84 N 269.69 E 618.~
'' 6~,88 N 288.43 E 679.12
688.58'N .... 305.65-E 740.2~ --
747.35 N 320.43 E 800.79
806.29 N 331.89 E 860.79
86~.09-~' 340.66 E 919.~-
5200 4941.30 4879.30 34 45
5300 5024.27 4962.27 33 5
5400--- 5108.11 5046.11 32' 58'
5500 5191.~5 5129.95 33 4
5600 5275.82 5213.82 32 55
5700 535~.87 ~-~2~7.87 32 40
5800 5444.03 5382.03 32 43
5900 5528.11 5466.11 32 49
N 6.89 E 0.24
· '-~
.
N 8 50 . 89
N .... 8' 69'E. : ?? 0.~i6
N 8 30 E."~.. '.'~0.24
O' 22
N 8.60
N 8.69
920.72 N 347.71 E 975.81
976.02 N 355.17 E 1031.3.5
I029.92'N '363.-'J~---'-B 1085.&8 ......
1083.82 N 371.38 E 1140.00
1137.70 N 379.38 E 1194.28
1191.26 N 387.48 E 1248.2-~-
1244.66 N 395.61 E 1302.12
1298.12 N 404.08 E 1356.10
SPERRY-SUN WELL SURV£Y!NG~ COMPANY
PAOE
ARCO ALASKA, INC.
DS 4-17 ,'
..... ..,.,j.i ,.>.,, .; ,,.~:. ,.~,~;.,.. ,..,,
vERTIc--C-~, i: ~-E-C]~-O~ C~LG~T~D ALONG CLOSURE
ANCHORAGE ALASKA
DATE OF SURVEY FEBRUARY
COMPUTATION DATE
FEBRUARY 17'~ 1986
BOSS GYROSCOPIC
17, 1986
'
,::oo F*
TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL
OEPTH ~~ ~ M!N ~EGREES OEO/IO0
6000- ............ 5~2';~ ............ 5~~ ~ ..... 2 .............. N ..... ~"~i:FE ~ ...... 13~77~ ~12 ~ 96 E 1410. 35
9.80 E 0.27 1405.35 N 422.07 E 1464.61
10. 0 E 0.13 1458.71 N 431.38 E 1518.60
N'-I-O':-~£ ~, 31 ' 1512. :16 N 440195 ~ -- i-!$72:~ 91 r~
10'80 E 0.29 !565-80 ::.:..450-94 E 1627.4t
10'50 E 0'47 1~19.1~ N 4~0.98 E 1~81.6~
N 10. 69 E O. 51 16~-~. 58 N 470.97 E 1735.95
N 11. 0 E 0.73 1726.82 N 481.37 E 1791.13
61 O0 5695.98 5633.98 32 49
6200 5780.04 5718.04 32 45
&3OD-- ' ~864, O1 .... 5B02; O1 1'
::: :~JO0 5947 '82 588:5.82 6
.
sosa, 7a aa
7oo
6282. I 8 6220.18
--- ~365' 18 i '6303.'18 '
6448, !0 6386.10
6531 · 34 6469.34
- ' '66'14.87 .... 6552~'~7'
33 44 N 10.89 E
:g--4 ..... ----4-'- N 10' 50
33 53 N 9.69 E
33 24 N 9.10 E
33 16 N 8.60 E
0.15 1781.45 N 491.94 E 1846.73
0'40 183~,27 N "502' 30 E 1902.46
0.48 1891.29 N 512.10 E 1958.27
0.59 1945.97 N 521.15 E 2013.57
O. 30 2000.28 N 529.61 E 2068.38
6698.37 6636.37
6781.81 6719.81
6865.'05 6803.05
6~47.90 6885.9O
7030,70 :6968.70
7113.77 7051.77
33 30
33 23
33 54
34 12
34 ::' 0
N 8.60 E 0.22 2054.70 N 537.84 E
N 8.50 E 0.13 2109.20 N 546.03 E
N 8.-:'39 £ 0.52 2164,,01 N ~4.18 E
N 8.60 E O. 32 2219.40 N 562.45 E
N e
2123.23
2178.16
F--
2289.2..0....
234~' ~:
33 38 N 8.10 E 0.36 2329.98 N 578.54 E
2400.54
6800
6900
7000
:: 7100
·
7200
7300
7400
7500
7600
:'7700
7800
7900
8000
8100
7197.09 7135.09
7280.60 7218.60
7364.34 7302.34
33 28 N 7.80 E 0.24 2384.74 N 586.19 E
33 15 N 7.80 E 0.22 2439.24 N 593.65 E
33 1 N 7.69 E 0.25 24~3.41 N 601.02 E
2455.59
2510.35
2564.77
8200
8300
7448.34 7386.34
7532.66 7470.66
8400
8500
8600
7617.30 7555.30
7702.05 7640.05
:786.82 7724.82
8700 7871.92
8800 7957.66
8900 8044.54
7809.~2
7895.66
7982.54
32 40 N 7.89 E 0.36 2547.15 N 608.39 E
.::. :~:~;~.:-~:: ~'
32 21 N 7.80 E':':::;~~.33 2600.40 N 615.73 E
32 0 N 7.69 E '"::~::0.35 2653.18 N 622.91E
32 6 N 8. 0 E -:::
~::~i~p:.,!iO... 18 2705.76 N 630.16 E
31 58 N 10.69 ~:,::,::~<, 1:44 2758.08 N 638.77 E
31 23 N 11 89 g~'~-~::~:'~ ~'
· ~;::~.~o 2809.58 N 649.06 E
30 33 N 12.39 ~::;:~::i~.87 2859.89 N 659.89 E
28 46 N 13.39 ~i~:~i.85 2908.14 N 670.93 E
2618.
2672.
2725.
2778.
2831.
2883.
2935.
2984.
78
30
32
07
56
O1
51
SPERRY-SUN WELL SURVEYING COMPLY · PAGE
ANCHORAGE ALASKA
DATE OF: SURVEY FEBRUARY 17, 1986
ARCO ALASKA, INC.
DS 4-17
· ALASKA
:.
VERTICAL SECTION CAI
COMPUTATION DATE
FEBRUARY 17. 1986
MEASURED
9000
9100
9200
9300
ALONG CLOSURE
TRUE 'SEA COURSE COURSE
I NCL I NAT I ON
: :.: DEG M!N
BOSS GYROSCOPIC
OPERAT~T:'
DOG-LEG TOTAL
9400
9500
VER,
DEPTH
,,. OD FT.
DIRECTION SEVER I TY RECTANGULAR VERT IC~
DEGREES DEG/1 O0 NORTH/S~TH ~ECT.'r'"51
·
1.45 2953.85 N 682.14 E 3031.57
0.95 2997.69 N 693.32 E 3076.81
1.36 3039.73 N 704.42 E 3120.27
1.60 3079,43 N 715"39 E 3161.4~--
1.32 31.16, 82 N ~ 72~.03 E 3200.26
0.76 3152'63 N 736.17 E 3237.44
8132.76 8070.76 27 22 ............. ~'"'i'~":'-J-~"'E ....
8221.93 8159.~3 26 25 N 14.39 E
8311.98 8249.98 25 7 N 15.1~ E
8495'22 8433.22 22 13. N!&.iIO E
8588.04 8526.04 21 29 N 15.50 E
9504 8591 . 76 8529.76 21 22 N 15.30 E 3.28 3154.04 N
9600 8681,32 8619.32 20 48 N 14.89 E 0.61 3187.40 N
9700 8774.93 8712.93 20 23 N 14.60 E O. 43 3221.42 N
~--- 8868,~ .... 8eo~. 66 -20 .... ~ ........ ~-i-~--,-~-~-'~ ~.'~: ~32~.14' N
9868 8932' 40 8870.40 20 23 N 14.60 E 0.00 3278,07 N
I:[O~'i-Z ONTA-L--D I-T~PL--A-C~NT =
736.56 E 3238.90
745.56 E 3273.43
754.52 E 3308.61
763, 30 E ~3343, 44
769.27 E 3367.1.2
3367.12 FEET AT NORTH 13 DEG. 12 MIN. EAST AT'MD = 9868
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
SPERRY-SUN WELL SURVEYING COMPANY
ARCO ALASKA,
DS 4-17
PRUDHO£ ' BAY
i ALASKA
INC.
ANCHORAGE ALASKA
COMPUTATION DATE
FEBRUARY ~ 17," · 198&'
VALUES FOR EVEN
DATE OF SURVEY FEBRUARY
. ,:
OPERATOR-T"
MEASURED
DEPTH
1000 FEET OF MEASURED DEPTH
TOT-A'L
RECTANOULAR COORD I NATES
NORTH/SOUTH EAST/WEST
MD-TVD
DIFFERENCE
17, 1986
FT.
0 0.00 -62.00
1000 999.99 937.99
:~iii~O00 :/~2995.46 2~33.46
:i14000 ! 13951.18 3889,18
5000 .... 4778~08 4718.'08
~000 5~12.05 5550.05
7000 ~448.10 ~38~.10
8 a2.4o 8870.40
0.00 0.00
4.1~ S 1.27 W
13'40 N 5!,b9 E
28~,04 N ' 140.78 E
8'0~.29 ~ 331.89 E
O. O0
0.01 0.01
·
0'20 '0'1:9 :'
40, 82 44' 28
221.92 173.10
1351.75 N 412.98 E
1891.29 N 512.10 E
2953.85 N 682, 14
3278.07 N 769, 27 E
387.95 1 &&. 04
551.90 183.95
9a . 68, 36
THE CALCULATION PROCEDURES ARE BASED 'ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD.
ARCO ALASKA, INC.
DS 4-17
PRUDHOE BAY
ALASKA
SPERRY-SUN WELL SURVEYING COMPANY
ANCHORAGE ALASKA
COMPUTATION DATE
DATE OF SURVEY FEBR
FEBRUARY 17, 1986
dOB
KELLY
OP.ERATOR-T.
VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
PAGE
17, 1986
O0 FT.
MEASURED
DEPTH
VER T I CAL ?:i ii!:ii:~~!I CAL REC T ANGULAR COORD INA TE S
DEPTH .... '~'"~'"~'~ .... '~'~'~PTH NORTH/SOUTH EAST/WEST
MD-TVD
DIFFERENCE
VERTICAL
CORRECT I ON
0
62
262 ~
~62
O. O0 -62. O0 O. O0 O. O0
62. O0 O. O0 O. 06 S O. 01
~-~ 'lr~, O0 0-~. E;~-'-~' 0-. 07
262' O0 200' O0 I. 17 S O. 08
362- O0 300. O0 1.79 S O. 11
462,
562. O0 500. O0 3.04 S O. 52
662. O0 600. O0 3.45 S O. 55
862
962
1--0~2 ......
1162
1262
lr3~ ........
1462
1562
T627-0~- .....
862.00 800.00
962.00 900.00
~-O-E;2.--O-O ............. 1~00,00
1162.00 1100.00
1262.00 1200.00
1462.00 1400.00
1562.00 1500.00
O. 99
1.21
I. 35
1.33
O. 56
1762 1762. O0 1700. O0
O. O0
E O. O0 0. O0
E .0~-. ~ o 'o~
E O. O0 O. O0
W O. 01 0.00
W 0.01
W 0.01
W 0.01
3,78' ~ W ~
3.94 S W 0.0!
4.12 S W 0.01
2[~. 23' 'S W 0.01
4.34 S W 0.01
4.72 S W O. 02
5~-'I7--~ '0~.~ 27" E O, 02
5.89 S 0.72 E 0,02
6.78 s ;1.1~:~E~' '~i;: :."~":~ ~0,0~
~ 09 'S 1'. 86 E 0: 04
9.92 S 2.82 E 0.06
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
O. O0
0'01
0.01
O. 02
ARCO ALASKA,
DS 4-17
. PRO~- BAY
MEASURED
DEPTH
INC.
SPERRY-SUN WELL SURVEYINO COMPANY
ANCHORAOE ALASKA
DATE OF SURVEY FEBRUARY 17,
COMPUTATION DATE
FEBRUARY 17, 1986
dOB NUMBER AK~-i
KELLY
OPERATOR-T
VER T I CAE
CORRECTI ON
VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
MD-TVD
DIFFERENCE
TOT/~E
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
1986
O0 FT.
1862 1862.00 1800.00
1~62 1962.00 1900.00
::20~2'--~.-0.~~00:~:oo
2162 2162.00 2100.00
2262 2262.00 2200.00
2462 2462.00 2400.00
2562 2562.00 2500.00
i:iliiii'?::2~2'- Z~Z,O0 :' Z~O0, O0
12762 2762.00 2700.00
..:ii12864 2862.00 2800.00
2~65 "2~62.00' 2YO0. O0
3067 3062.00 3000.00
3169 3162.00 3100.00
~72~-'-32-~2, O0 ...... 32~0
3376 3362. O0 3300. O0
:'348° 3462. O0 3400" O0
3~585 3582. dDT- ...... o~
3690 3662. O0 3600. O0
12.67 S
15.98 S
21.5~> $
23.06 S
23.02 S
22.54 S
2o..57 $
14, 98 S
5.17 $
8~ 14 'N'
24.38 N
43.43 N
66.7~ N
93.49 N
121.84 N
183.65 N
4.22 E O. 11
5.84 E 0.18
7;-~E 0,-2-4
7.~ E 0,27
8,24 E 0.2~
8-,2~'--E 0~.~
8.47 E 0.29
9.51 E 0.30
14.41' 'E 0.45
23, O0 E O. ~,
35.21 E 2.22
48; 28 E 3.' 95
57.45 E 5.69
63.96 E 7.70
71,50 E I0,69
77.43 E 14,3~
82.95 :':'E:i:'''::~'''.:'' ' !8"46
91.76 'E 23.28
102.58 E 28.74
O. 05
O. 07
o,'o~
0'01
O, O0
O. O0
0.01
o, 1~
0.54
1,23
1'74
1.73
2.02
2.98
3. ~8
4.10
4.81
5.46
WELL SURVEY INO' COMPANY
ARCO ALASKA, INC.
DS 4-17
PRUDHOE BAY
PAGE 8
ANCHORAGE ALASKA
COMPUTATION DATE
DATE OF SURVEY
FEBRUARY 17, ! 9e~. JOB UMBER
KELLY
OPERA'
17, 1986
o0 FT. :
~ASURED
DEPTH
,ATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
T~-OE-' - :?i!i~!~!SE-A- T O T AL
VERT!CAL :i!~i~iCAL RECTANGULAR COORDINATES MD'TVD
DEPTH ......... _NOR _T_ H__/._s__0__u.._TH_ ......... _E_A.~__T / WEST DIFFERENCE CORRECTION
3796 3762.00 3700.00 216.32 N 114.12 E 34.58 5.84
3903 3862.00 3800.00 251.56 N 127.22 E 41.42 6.84
!:4122 4062.00 4000.00 332.74 N !61.8& E 60.11 10.32
!4236 4162.00 4100.00 381.22 N 187.47 E 74'18 14.07
4354 4262.00 4200.00 ~-~-7~44 N 216.58 E 92.56 18.37
4477 4362 O0 4300.00 = ~
· -,0~.55 N 244.79 E 115.20 22.64
4~02 4462.00 4400.00 573.09 N 270.13 E 140.18 24.98
4728 .... --~5~.00~--~0.00 ~;~-N ~-;~3 iE i~,50 26,32
4854 4662.00 4600.00 720.66 N 314.5~: E 192,70 26.20
4979 4782.00 4700.00 794.47 N 329.82 E 217.93 25.23
~-~.~I E 241.43 23.49
5 IOOF- .....~.-0-0- .......... 4--8-0-0-:0-0 .............. 8-~;-;-'0~--~
5225 4962.00 4900.00
5345 5062.00 5000.00
54~ .... br1-~~'---~O
5583 5262.00 5200,00
5362,00 5300.00
5821 5462T(~£~ ...... 5'40~.00
5940 5562.00 5500.00
934.98 N 349.44 E 263.20 21.77
1000.33 N 358.81 E 283.03 19.84
~0~54~51--N~-~368.5~ E 302.25 19.'2~
1128.85 N 378.05 E 32~.54 1~.2~
1256.~-~--~ 397.36 E 359.36 18.83
1319.69 N 407.61E 378.32 18.96
SPERRY-SUN WELL SURVEY!NO, COMPANY
ARCO ALASKA,
DS 4-17
INC.
ANCHORAGE ALASKA
COMPUTATION DATE
FEBRUARY~ 17, "1986
DATE OF SURVEY FEBRUARY 17,
1986
MEAS.URED
DEPTH
,TED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
VERTICAL DEPTH
TOTA-E
RECTANG.ULAR COORD 1 NATES
NORTH/SOUTH EAST/WEST
MD-TVD
DIFFERENCE
6775
·
71~
7256
737~;
7496
7617
77~7
7857
80~7
8216
6059 5662. O0 5600. O0
6178 5762. O0 5700. O0
:~zs,7" - '~6~-~oo"oo
~:~62. oo s~oo. oo
60.62' O0 6000. O0
6162~-0-0'--~ ' & 100. O0
6262.00 6200.00
6362.00 6300.00
6562.00 6~00.00
6~62.00 6~00,00
~S7~2."00 6700.'-0--0
6862.00 6800.00
6962.00 6900.00
7062,00 7000,00
7162,00 7!00,00
:'::~72~2,00 7200.00
7362.00 7'300.00
7462.00 7400.00
1383.75 N 418.34 E
1447.28 N 429.36 E
:1~'i0.87"N--- .... 440,'72:E
1574,88N
~02.41~"N 47~':&~ E
1768.22 N 489.39 E
1834.15 N 501.91E
1965.~4 N 524.3~ E
397.57
416.55
~~o
454, 93
473, 89
493.34
513.73
534.16
5~4"75
574.73
614.27
19.24
18.98
i~"o~
18' 95
19.45
20.39
20.43
20,5~
2030.90 N 534.24 E 19. &5
~096,28-'N 544 :i O'E 19.88
2161 . 98 N 553.88 E 634.32 20.05
2228.88 N 563.89 E 655.05 20.73
2295' 78 :N ' 573'66: 'E 675"'77 20.71
2:361.74 N ~3.03 E ~:,95.93 20.16
2491.90 N 600.82 E 735.21 19.46
2555.82 N 609.59 E 754.22 19.01
ARCO ALASKA,
DS 4-17
ALA.gK~ '
INC.
i ~ ~ASURED
PTH
INi
SPERRY-SUN WELL SURVEYING COMPANY
PAGE 10
ANCHORAGE ALASKA
COMPUTATION DATE
DATE OF SURVEY FEBRUARY 17, 1986
KELLY BUSH!' .00 FT.
OPERATOR-T'
~TED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
~'. ii:~.:-:.~i~i:i~i~SE. : TOTAL
VERTICAL 'i:!~CAL RECTA~ULAR COORDINATES : MD-TVD
DEPTH ~::'c~.".,:-i~.::~~T H NORTH/SoUTH EAsT/WEST DIFFERENCE
CORRECTI ON
8334 7562. O0 7500. O0 2618.82 N 618.25 E 772.73
8452 7662. O0 7600. O0 2680.88 N 626.67 E 790.73
8688 7862. O0 7800, O0 2803. &5 N 647. el E 826' 37
8805 7962. O0 7900. O0 2862.39 N 660.44 E 843.04
89] 9 8062. O0 ~0. O0 ~gi 7.47 N 6~'~-'5 E 857, 92
9032 8162. O0 8100. O0 2~&8.53 N 685.8& E 870. ~3
~ 144 8262. O0 8200. O0 301 ~. ~2 N &~8.27 E 882.71
92:55 .... e362, O0 e300; O--d 3062, i3 N 710'53 E e93' 15
~364 8462' O0 84~. O0 3103.78 N 722, 27 E 902.11
9472 8562. O0 8500. O0 3142.76 N 733.43 E 910.02
9579 ..... ~. O0 -~600, O~ ~i~~0' N 743.67 E 91'7,33
9686 8762. O0 8700. O0 321~. 77 N 753.31 E 924.21
9792 8862. O0 8800. O0 3252.74 N 762.68 E 930.89
~868 - ~ ...... 8870"40 ~~ ......... 76~. 27 E 935' 60
18.50
18. O0
8.01
17,64
16.66
14.88
13.01
11.79
10.43
8'. SI'6
7.91
7.31
6.88
6.68
4.71
================================= CALCULATION PROCEDURES USE A LINEAR INTERPOLATION ~~EN :':: ':'' '" "::
THE NEAREST--20 FOOT MD T~'I~OPI RADI~O~-'~--OF"CURVATURE) POINT~
SPERRY-SUN WELL SURVEYING COMPANY
ARCO ALASKA, INC.
DS 4-17
ANCHORAGE ALASKA
COMPUTATION DATE
' MEASURED
~PTH
I~~ATED VALUES FOR SPECIAL SURVEY POINTS
· *.~.;,~, :..., .~,.,n .. -.~-~- -
VER T I C AL ;ii:~i:...,i!!~CAL RECTANGULAR COORDINATES
DEPTH NORTH/soUTH EAST/WEST MARKER
DATE OF SURVEY FE
dOB
KI
~Y 17, 198~
9443 8535.03 8473.03
9453 8544.30 8482.30
::9&54 8731,81' 8669,81
9700 ..... 87~.~ 8712.93
3132.44 N 730.54 E
3136.04 N 731.57 E
;:9i'71~N ........ ~1.27 E
3t 79.16 N 743, 37 E
3205, .g2 N 750.48 E
TRUN TOP SADLEROCHIT
TOP ZONE 2
GAS/OI L C-~N~ACT
GAS/OIL CONTACT
TOP ZONE I B
3221.42 N
754.52 E
SURVEY DEPTH
9:)722 87.'~5.55 8733.55
9769 8839.61 8777.61
~86~--- .... 8932, 40'
3228.84 N
3244.69 N
756.45 E
760.58 E
BASE SADLEROCHIT
PLUGBACK TD
TOTAL DEPTH DRILLER
ARCO ALASKA, INC.
liE; 4-17
~ ~.. STRAT I GRAPH I C SUMMARY
DERIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA
TOP ZONE 2
GAS/OIL CONTACT ~576
TOP ZONE lB ~54
PLUGBACK TD ~769
·
TOTAL DEPTH DRILLER ~8&8
DEPTH TVD ....... THICKNESS WITH WELLHEAD
BKB BKB SUB-SEA VERTICAL (ORIOi 27~FWL)
SEC 26/~: RI5E
8535,03 8473.03
8544.30 8482.30
8658.89 859~.89
8731.81 8bb~.81
883~,&1 8777,&I
8~32.40 8870.40
91 730.54~
3171,26N 741.27E .......
3179.1bN
3205.~2N
743.37E
750, 48E
~F.~ ...... ?~i,-~
3244. ~gN 7&O. 58E
3278.07N 7b~, 27E
1) FROM'LINEAR E~"-DE-EI~-STATION.
2) COMPUTER PROGRAM - SPERRY SUN THREE DIMENSIONAL RADIUS OF CURVATURE.
DATA CALCULATION AND INTERPOLATION BY RADIUS OF CURVATURE
COMPUT-~OI~
FEBRUARY 17, 198b
DATE ¥~;::~..!~Y FEBRUARY 17, 1
~:~" ~ ":: ::~:":~" .... ~i'::'"
JOB NUMBER ~'AK-BO-~,O0~ ~
KELUY"~INO ELEU. =
62.00 FT.
SCALE :- 1 INCH TO lO00. O0 / 1000.0
PRUOHOE BAT
OS 4-17
RK-80-60011
T~UE NORTH
00.00
ARCO ALASKA, INC.
FEBRUARY 17, rgB6
9868
O0
O0
l_lO00. O0
H(~RIZONTflL PRgJECT i IZIN
5CRL6~:- 1 INCH TO 2000.00 / 2000.0
PRUOHOE BAT
ARCO RLRSKRo
FEBRUARY
OS 4-17
qK-80-60011
0.00
2000.00
4000.00
6000.00
lO00O. O0l,
69~2.40
-- 9868
20~0.00
4°I:o. oo
INC.
1986
VEBT :[ CFtL PROJECT :[ ON
Form to be inserted in each "Active" well folder to check
for timely compliance~with our regulations.
OPERATOR, WELL NAME AND NUMBER
Reports and Materials to be received by:~' /~--- Date
Required Date Received Remarks
Completion Report
$~mp ~ ~ ..':~-' P___ ~ ~ -..~/4,.,
COre Chips
Core Description ,,,
Registered Survey Plat
Inclination Survey .
, ,, ,
Directional Survey Ve.$-Pl
Drill Stem Test Reports
Production Test Reports
.. ~v ~~ : ....,, ,,
, ,
ARCO Ala.s'ka, Inc.,
F',O. Box t00S60
Anchorage, Ala.ska
99~ ~ 0
DATE: March
REFERENCE:
O,.? 4.- i 7'~
'~ D,.? 4-t
'~ I) £' 4-t'?~/
~DS 4-t7
4-t 7'
i i , i 986
ARCO Open
2-. i i -86
2- t ~ -86
2--i i -86
2-i i-86
2-. i i -86
Hole Fina
CDL/CNL Run t 2" &5" DA
DIFI_ Run t 2'&'.S" DA
CDL R u'n i 2" &5 ' I)A
BHC Acou..s't i log
Run i 2"&5" DA
GR Log Ru, n i 5' I)A~-
i-2S-86 DIFL Run i 2"&5" DA
CDL/CNL Run i 2'&5' DA
C D L R u n i ~' ' * ''~ '
~ DA
BHC Acou.s'ti Log Run i 2'&5' DA
GR I._og Run i 5' DA
F'ro Log Run t 5" DA
F'l. ea.s'e ~-ign and return the attached copy a.s 'receipt' of data.,
l::.'.ec e i red By .............................................
HAVE A NICE DAY!
Irma CarLin
A'FO- t 429F'
'T'I:;~ANS .~:86i 9S
DISTRIBUTION
.~ Ce'ntr,e [ F i t.e.s
· ,,.~" Ch err on
· '~ D & M
~ Extension Exp £ora~ion
· '" Ex xon
~,~. Marat'hon
~- Mob i [
· ,-'"' F'h i t. I i p s'
PB WeLL FJ [e~'
~~ R & D
· "' S'oh i o
~~ Texaco
ARCO ALaska, Inc.
P., 0.,
Anchorage, Alaska
995 ~ (~
DATE' March it, t986
REFERENCE' ARCO Magne+. i c
Tape.'-; w/i. i.s't lng
~ D 5' 4 - t '7 ~"~ -' t '7 - 8 6
DX 4-t 8 2-8-86
0 / H ~. 2
O/H
CH CNL. ~
/4//
I:(un t
DA
5'c h
Pl. ea..'~e s'ign and ret'urn fhe affached c:opy a.s' receiF.~f, of dat'a~
Recei red
HAVE A NICE
I'~"ma CaY:Lin
ATO-t 429F
'TRAN$ 4:86200
D I Z T R I B U T I 0 N
· .-~' Central. Fi [e:~
Ch err on
D & M
Extension ExpI. oration
~ Exxon
M~ra ~hon
Mob i ~
PB Well Fi le~
F(& D
,S'fate of A l_aska
Texaco
/-- STATE OF ALASKA ~-~ ¢ e_~ ,~_
ALASKA O,~_ AND GAS CONSERVATION CO~,,,vllSSION
dONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling wel~-] Workover operation E~ r[
WATER INJECTOR
2. Name ofoperator 7. Permit No.
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 029-21532
4. Location of Well
at surface
795' FSL, 279' FWL, Sec.26, T11N, R15E, UM
5. Elevation in feet (indicate KB, DF, etc.)
62 ' RKB
6. Lease Designation and Serial No.
ADL 28324 ALK 2322
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
4-17 (Injector)
11. Field and Pool
Prudhoe Bay Fi eld
Prudhoe Bay 0il Pool
For the Month of February , 19 86
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well ~ 0300 hrs, 1/28/86. Drld 12-1/4" hole to 3540'. Ran, cmtd, & tstd 13-3/8" csg. Drld 12-1/4"
hole to 9868'TD (2/10/86). Ran logs. Ran, cmtd, & tstd 9-5/8" csg. PBTD = 9769'. Secured well & RR ~ 1700
hfs, 2/13/86.
13. Casing or liner ru.n and quantities of cement, results of pressure tests
20", 91.5#, H-40, weld conductor set (~ 120'. Installed w/1814# Poleset.
13-3/8", 68.0#/72.0#/ft, K-55/L-80, BTC csg w/shoe 3522'. Cmtd w/3300 sx CS III & 400 sx CS I1.
Top job performed w/200 sx CS I1.
9-5/8", 47.0#/ft, L-80, BTC csg w/shoe (~ 9855'. Cmtd w/700 sx Class G.
14. Coring resume and brief description
None
15. Logs run and depth where run
GR/ACC/DIFL depths not available
CNL/CDL/GR/Cal
16. DST data, perforating data, shows of H2S, miscellaneous data
None
RECEIVED
MAR I 4 1986
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
SIGNED ~0_~ ~ TITLE Associate Engineer DATE 5'7'"8~
NOTE--ReportCn this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 DAM/MR21
I~,, '~ I on
Submit in duplicate
ARCO Alaska, Inc ....
Post Office i 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
February 12, 1986
Mr. C. V. Chatterton
Commi s s i oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ss ion
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT- State Reports
Dear Mr. Chatterton-
Enclosed are the January Monthly Reports for the following wells'
1A-8 3F-16 3J-13 3N-2A 4-27 L2-25
2A-11 3I-1 3J-14 4-7 4-28 L2-29
2A-12 3I-2 3J-15 4-17 16-21 L3-5
2H-5 3I-3 3N-1 4-18 16-24 L3-23
2X-8 (2) 3I-4 3N-2 4-24 L1-9 ~Ugnu State #1
If you have any questions, please call me at 263-4944.
Sincerely,
d. Gruber
Associate Engineer
JG/tw
GRU13/L111
Enclosures
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
RECEIVED
FEB ! ]~ 1986
Alaska 0il & bus Cons. Gummissi0n
Anchorage
STATE OF ALASKA --
ALASKA U,~ AND GAS CONSERVATION CO,,,MISSION
Mo- T 'ILY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling wel~(~
Workover operation []
WATER INJECTOR
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 86-20
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21532
4. Location of Well
at surface
795' FSL, 279' FWL, Sec.26, TllN, R15E, UM
6. Lease Designation and Serial No.
ADL 28324 ALK 2322
For the Month of. January , 19 86
5. Elevation in feet (indicate KB, DF, etc.)
62 ' RKB
9. Unit or Lease Name
Prudhoe Bay Unit
10, Well No.
4-17 (Injector)
11. Field and Pool
Prudhoe Bay Fi eld
Prudhoe Bay 0il Pool
12. Depth at end of mOnth, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well ~ 0300 hrs, 1/28/86. Drld 17-1/2" hole to 3540' as of 1/:31/86.
13. Casing or liner ru.n and quantities of cement, results of pressure tests
None
14. Coring resume and brief description
None
15. Logs run and depth where run
None
6. DST data, perforating data, shows of H2S, miscellaneous data
None
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
NOTE--Report or'this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 DAM/MR02
[~,, '-/ I o~
Submit in duplicate
MEMORANnUM
TO:
THRU:
FROM-
State-of Alaska
ALASKA OIL ~-~..,O GAS CONSERVATION COMMISS_JN
C. V. 'C~~terton
L°nnie C. Smith ~
Commissioner
Doug Amos
Petroleum Inspector
DATE:
FI LE NO.:
February 10, 1986
D.ADA. 11
TELEPHONE NO.:
SUBJECT:
BOPE Test
ARCO PBU 4-17
Permit No. 86-20
Prudhoe Pool
Saturday, February 1, 1986: After witnessing the BOPE test at ARCO
KRU 2A-10 weli,' i ~rave~ed--to ARCO PBU 4-17 well to witness the BOPE
test.
Sunday, February 2, 1986: The testing commenced at 12:30 AM and was
~-o~-lnded~a~-~:-oo' AI~,~ ~ere were no failures and I filled out an
A.O.G.C.C. BOPE Inspection Report which is attached.
In summary, I witnessed the successful BOPE test at ARCO PBU 4-17
well.
Attachment
~)2-001 A(Rev 10-84)
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMM
B.O.P.E. Inspection Report
ION
"i nst~e, ctor ~.O .o~,
Operator ' A~C.O.
Location: Sec ~_~ Ti\~A R..I~.~-
Drilling Contractor
Date,,. ~
Representative
Pe rmi t #
~6asing Set
Rig ~ 55 Representer.iv.
Location, General..
Well Sign
General Housekeeping
Reserve pit
Rig
BOPE stack t Test Pressure
Annular Preventer
Pipe Rams b~ ~
Blind R~s ~
Choke Line Valves~
H.C.R. Valve~=.~
Kill Line Valves~
Check Valve ~
ACCUMULATOR SYSTEM
Full Charge Pressure. '~.CJ~D psig
Pressure After Closure ~ ~~ psig
200 psig Above Precharge Attained: minsq sec
Full Charge Pressure Attained: ~-' min~.~se¢
N2 %~O,Ol ~900; (.~ OO i k$%~ psig
Controls: Master O~< ....
.... Remote ..~,.,,~.,, Blinds switc...h ¢over_~
Kelly and Floor Safety Valves
.Upper Kelly I M~Test Pressure
Lower Kelly { ~P'Test Pressure
Ball Type ~ ~Test Pressure /
Insi4e BOP
Choke Manifold
No. Valves
No. flanges
Adjustable Chokes
Hydrauically operated choke ,
..... I ~Test Pressure
.... ~ ,~est Pressure
Test Results: 'Failures kJObl~ . . Test Time ~-- hrs. j~f5 ~vk
·
Repair or Replacement of failed equipment to be made within days and
..
Inspector/Commission office notified.
Remarks:
·
Distribution
orig. - AO&GCC'
cc - Operator
cc - Supervisor
January 24, 1.986
}~tr. T. P. Oostermeyer
Regional Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
Re: Prudhoe Bay Unit DS 4-17
ARCO Alaska, Inc.
Permit No. 86-20
Sur. Loc. 795'.FSL, 279'F%~L, Sec. 26, TllN, R15E, UM.
Btm_hole Loc. 1237'F[~L, 1347'F~L, Sec. 26, TllN, R15E, IR{.
Dear Mr. Oostermeyer.
Enclosed is the approved revised application for permit to drill
the above referenced well.
The provisions of the cover letter, dated January 15, 1986,
accompanying the original approved permit are in effect for this
revision.
t 1 .%s, -
c. v.
Chairman of
Alaska Oil and Gas Conservation Commission
BY ORDER OF THE COM'a4ISSION
be
'Enclosure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug L. Lowery
ARCO Alaska, Inc.
Post Office Box l uv360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
January 23, 1986
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: REVISED Permit to Drill - DS 4-17
Dear Mr. Chatterton:
As per the telephone conversation between Mr. Harold Hedlund and
Gregg Walz today, attached is the revised permit application for DS
4-17. This revision reflects a change in the proposed casing
program from 10-3/4" surface casing and 7-5/8" casing at TD to
13-3/8" surface casing and 9-5/8" at TD. Since the directional and
BOPE information are not changing, they will not be resubmitted.
Since we expect to spud this well on January 26, 1986, your prompt
attention on this matter will be appreciated.
Sincerely,
T. P. Oostermeyer
Regional Drilling Engineer
TPO/GSW/tw
PD/L214
Attachment
RECEIVED
Alaska Oil & Gas Cons. C0mrn/ss/on
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA OI- AND GAS CONSERVATION COMMISSION
P :RMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL E~x
REDRILL []
DEEPEN []
1 b. Type of well
(REVISED)
EXPLORATORY []
DEVELOPMENT OIL []
DEVELOPMENT GAS []
SERVICE I~ STRATIGRAPHIC
SINGLE ZONE [~
MULTIPLE ZONE
2. Name of operator
ARCO Alaska, Inc.
3. Address
P, 0, Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
0il ,:~ 6:=,,
4r,¥j~.~roUeO)ns C;.:,,,,.;mission
795' FSL, 279' FWL, Sec.26, TllN, R15E, UM
At top of proposed producing interval
1320' FNL, 1320' FWL, Sec.26, T11N, R15E, UN
At total depth
1237' FNL, 13/+7' FWL, Sec.26, T11N, R15E, UH
5. Elevation in feet (indicate KB, DF etc.)
RKB 62 '
6. Lease designation and serial no.
ADL 28324 AK 2322
9. Unit or lease name
Prudhoe Bay Unit
10. Well number
4-17 (Injector)
11. Field and pool
Prudhoe Bay Field
Prudhoe Bay 0il Pool
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 14. Distance to nearest property or lease line
6 mi. NE of Deadhorse miles 1320' ~ ~a~get feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease
9770 'MD, 8857' TVD feet 2560
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures
KICK OFF POINT 2500 feet. MAXIMUM HOLE ANGLE 30.5 oI (see 20 AAC 25.035 (c) (2)
15. Distance to nearest drilling or completed
&4.:]~ well ~8:8 ....... ~s,u,~r+~a~ce~ feet
18. Approximate spud date
2933DI' ps'ig@_ 80'~F Surface
3950 _psig@ 88/+7 ft. TD (TVD)
21
Proposed Casing, Liner and Cementing Program
SIZE
Hole Casing
-1/2" I~-~/R"
1~,-~./R-
12-1/"" 925;~'-'
.CONT I NG~NCY -
8-1/2" 7"
Weight
9! ,5#
68 ~0#
79_
/~7
CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Grade Length MD TOP TVD MD BOTTOM TVD (include stage data)
Coupling
H-40
I
L-80
80'
4!'
3455'
97'~'~ '
I
39' ! 39'
80' i --
__ I
I
"on'l,~ I~'~'=.
80'1 80'
3535 ' I 3500 '
q77¢)' I RR~7 '
2000# Poleset
3000sxCS !!!&~:00sx CS !!
500 sx C!ass G
29.0# BTC 690' 9080' 8263' 9770' 8857' 300 sx Class G
ARCO Alaska, Inc., proposes to directionally drill this Sadlerochit injection well to 9770'MD (8857'TVD). A 20",
2000 psi annular diverter might not be used for this well. A waiver of the surface hole diverter system for
Drill Site 4 has been received from the AOGCC. The 13-5/8", 5000 psi, RSRRA BOPE stack will be installed and
tested (rams 5000 psi, annular 3000 psi) weekly upon installation and operationally tested each trip. After
reaching TD, logs will be run across selected intervals. The well will be completed as an injector using a
workover rig at a later date. A 4-1/2" tubing string and packer will be run and set above the Sadlerochit. A
downhole safety valve witl be installed and tested upon completion of the job. Selected intervals will be
perforated in the Sadlerochit formation and reported on subsequent reports. Reserve pit fluids will be disposed
of down the 9-5/8" x 13-3/8" annulus of this well. (cont'd on attached sheet)
23. I hereby certify that the foregoing is true and correct to the best of my knowledge
/ / ~ TITLE Regional Drilling Engineer
SIGNED
The space below for Commission use l/
CONDITIONS OF APPROVAL
Samples required Mud log required
I--lYES ~,NO []YES ,~NO
Permit number Approval date
Form 10401 (GSW) P~)/PD214 /
Rev. 7-1-80
Directional Survey required
]~YES El]NO
APl number
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE
by order of the Commission
January 24, 1986
Submit in triplicate
REVISED Permit to Drill (cont'd)
4-17 (Injector)
NOTE: The following additional wells are within 200': DS 4-16 60' ~ surface;
DS 4-18, 60' ~ surface; DS 4-19, 122' ~ surface; DS 4-24, 180'
surface.
The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any
interruption in the disposal process. Upon completion of the disposal
process, the annulus will be sealed with 300 sx of cement followed by Arctic
Pack.
January 15, 1986
t~Ir. T. P. Oostermeyer
Regional Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
Re .-
Prudhoe Bay Unit 4-17
ARCO Alaskm., Inc.
Permit No. 86-20.
Sur. Loc. 795'FSL, 279'FWL, Sec. 26, TllN, R15E, UM.
Btmhole Loc. 1237'FNL, 1347'F%TL, Sec. 26, TllN, R15E, l%i.
Dear Mr. Oostermeyer:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indemnify you from the probable need
to obtain additional permits required by law from other
governmental agencies prior to commencing operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. Where a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
Very truly yours,
C. V. ChattdrrOn
Chairman of
Alaska Oil and Gas Conservation Commission
BY O~ER OF THE CO~ISSION
dlf
Enclosure
cc: Department of Fish & Game, ~tabitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug L. Lowery
ARCO Alaska, Inc.
Post Office b~,x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
January 10, 1986
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 4-17, Permit to Drill
Dear Mr. Chatterton:
Enclosed are:
An application for Permit to Drill DS 4-17, along with
a $100 application fee
Diagrams showing the proposed horizontal and vertical
projections of the wellbore
Proximity plots
A diagram and description of the surface hole diverter
system
A diagram and description of the BOP equipment
Since we estimate spudding this well on January 22, 1986, your
earliest approval will be appreciated. If you have any questions,
please call Gregg Walz at 263-4541.
Sincerely,
K. M. Le
Regional Drilling Engineer (Acting)
KML/GSW/mh
PD2/L21
Enclosures
Alaska Oil ii Gas Cons. Anchorage
ARCO Alaska, Inc. is a Subsidiary of AflanticRichfieldCompany
..... STATE OF ALASKA
ALASKA'u~L AND GAS CONSERVATION CU,~IMISSlON
PERM:ol c? .oOo DRILL ([ D
-- ,
la. Type of work. DRILL E~x lb. Type of well EXPLORATORY [] SERVICE I~ STRATIGRAPHIC 1~3
REDRILL [] DEVELOPMENT@ILl--] SlNGLEZONE~L!,, ,:~,; ~ ?'" *~'"
DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE []
2. Name of operator ~Jask~i. 0il & Gas Cons.
ARCO Alaska, Inc. Anchorage
3. Address
P. 0. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface 9. Unit or lease name
795' FSL, 279' FWL, Sec.26, T11N, R15E, UM Prudhoe Bay Unit
At top of proposed producing interval 10. Well number
1320' FNL, 1320' FWL, Sec.26, T11N, R15E, UM 4-17 (Injector)
At total depth 11. Field and pool
1237' FNL, 1347' FWL, Sec.26, T11N, R15E, UM Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. Prudhoe Bay 0i 1 Pool
RKB 62' ADL 28324 AK 2322
12. Bond information (see 20 AAC 25.025) I-eoera I Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 14. Distance to nearest property or lease tine 15. Distance to nearest drilling or completed
,
6 mi. NE of Deadh_orse miles 1320' ¢ target feet ~4-t~ welt ~8' ~. ~s,u.~r~a~ce~ ..... feet
16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date
9770'MD, 8857' TVD feet 2560 01/22/B6
19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 2933 psig@__81:C~F__ Surface
o
KICK OFF POINT 2500 feet. MAXIMUM HOLE ANGLE ,~f~.c, (see 20 AAC 25.035 (c) (2) 3950 psig@ 88~.~7 ft. TD (TVD)
21
Proposed Casing, Liner and Cementing Program
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
30" 20" 91.5# H-40 Wel¢ 80' 40' I 40' 120'1 121' 2000# ~ Poleset
13-1/2" 10-3/4" 45.5# K-55 BTC 3496' 39' I 39' 3535'1 3500' 2000sxCS 111&3OOsx CS Il"
I I
9-7/8" 7-5/8" 29.7# L-80 BTC 9733' 37' i 37' 9770'[ 8857' 300 sx Class G
Conti ng(,ncy
6-~/4" 5-1/2" 17.0# L-80 FL4: 690' 9080' I 8263' 9770'! 8857' 100 sx Class G
I
I
22. Describe proposed program:
ARCO Alaska, Inc., proposes to directionally drill this Sadlerochit injection well to 9770'HD (8857'TVD) A 20"
2000 psi annular diverter might not be used for this well. A waiver of the surface hole diverter system for
Drill Site 4 has been received from the AOGCC. The 13-5/8", 5000 psi, RSRRA BOPE stack will be installed and
tested (rams 5000 psi, annular 3000 psi) weekly upon installation and operationally tested each trip. After
reaching TD, logs will be run across selected intervals. The well will be completed as an injector using a
workover rig at a later date. A 4-1/2" tubing string and packer will be run and set above the Sadlerochit. A
downhole safety valve will be installed and tested upon completion of the job. Selected intervals will be
perforated in the Sadlerochit formation and reported on subsequent reports. Reserve pit fluids will be disposed
of down the 7-5/8" x 10-3/4" annulus of this well. (See attached sheet.)
* The following additional wells are within 200': DS 4-16 60' @ surface; DS 4-18, 60' ~ surface; DS 4-19,
122' @ surface; DS 4-24, 180' @ surface.
-23. I hereby certify that the foregoing is true and correct to the best of my knowledge
The space below for Commission use
CONDITIONS OF APPROVAL
Samples required Mud log required
E]] YES ~J/JO I-lYES /[~24 O
Permit number Approval date
1~-zo 1/15/86
APPROVED BY . - ·
Form 10-401 "~-
Rev. 7-1-80 /
Directional Survey required
[~YES [-1NO
APl number
50- o '~ ~ ¢.-15'.~ ~L_
SEE COVER LETTER FOR OTHER REQUIREMENTS
,COMMISSIONER DATE
by order of the Commission
January 15, 1986
Submit in triplicate
Permit to Drill
4-17 (Injector)
(cont'd)
The 7-5/8" x 10-3/4" annulus will be left with a non-freezing fluid during any
interruption in the disposal process. Upon completion of the disposal
process, the annulus will be sealed with 200 sx of cement followed by Arctic
Pack.
Alaska Oil & (ia3 6oi~s. !_;ommission
1000
2000
3OOO
4000
5000
6000
7000
8OO0
TOP SAD
G/O CON
TAft,ET'
BASE SAD'
9000T~
iooOo
D84-17
1000
0 1000 _..~00 3000 4000 ~00 6000 7000
......... ~b" ~:;%,'' '.~ +~,~' ' ' ' ' ' ' ' '-~to ' ................................... o
ARC ::) AL.a,SKA, INC.
~CALE I IN = 1~80 FT.
SHL: 795' FSL, 279' FW L,
[OP TVD = ~6~ SEC.26, 'r11N, R15E, U
2.5
7.5 THL: 1320'FNL, 1320'FVfL,
[ 17.5 ~F~ 3R. 'r11N~ RIRF~
17.5
--~ 22'~5 10-3/4' CASING TVD -- 3~i00 MO -- 3531 DEP -- 230
EOC TVD = 3675 MD = 3734 DEP = 32~
- N 18 DEG 12 MINE
3332 F'F(TO TARGET) , ~ .
AVERAGE ANGLE
30 DEG il MIN -
~taska Oil &
K-lO TVD = 7412 MD= 8088 DEP = 2B66
K-IS TVD-7887 ~D-8838 DEP--2838
T-/D = 8622 MD = 8378 DEP = 3218
~ VD -- 8652 ME -- gB30 DEP = 3298
P TVD - 8712 M ) - 8~00 DEP - 3382 -
)' TVD = 8772 M) = 9670 DEP = 3368
D TVD=~857 ~ D=977~ DEF =3418
2000
3OOO
4000
5000
6000
7000
8000
9000
0 1000 2000 3000 4000 5000 6000
VERTICRL SECTION
10000
7000
z
Q_
r,1
__1
z
E - N COORDINRTES
0--2000 -1000 0 1000 2000 5000 4000 5000
0 III iii it i I , IIit II III IIII II II II I IIII I I I I i
~1-11' 71:t.fi'l:::!:l ~7~' ~1
SEC.26, TI lN, R15E, U~
THL:1320'F~L, 1320'FW:.,
SEC.26, TllN, R15E, U~
.,
DS -17
¢12 TARGET
TVD -- 8712'
TMD ~ 960C'
DEP ~ 3332'
N 3165
E 1041
-
i i i i i i i i 1 i i I i i i i i i i i i i i i i i i i i i i i 11 I i i i I i i i i i i i i i i i i i i i 1 i i i i i i i
-2000 - 1000 0 1000 2000 3000 tO00 SO00
B - N COOROINBT S
E,...]
o -2000
o
-1000
E - IN COOROINFI~ES
1000 2000
Z
3000
4000
5000
i i i i i i
03_i_2
_..~00
, i i i i i
-2000 - 1000 0 1000 2000 3000 ztO00 5000
E - IN COOROINR~ES
725
400
0
0
l.---q
I
I
!
-3OO
-200
E - N OOORDINRIES
-100 0 100
200
30o
400
! 255
[35zt-17-
89/
*~ 3377
996
i , i i i i i
-400 -300 -200 - 100 0 100 200 300
E - N OOOROINAIES
271~
SURFACE HOLE D IVERTER SYSTEM
ARCO ALASKA INC.
SCHEMATIC
.~~ I0" HYD. (~R. BALL VALVI~
IIIIF. LL I~ I $£[ E lA IL I
I0" HYO. OPR. ttAl_L VALVE
ALL 90* IlJ~NS ~ "TEE"
CUSNI(3N
·
I
I
I
I
I
lines open autoaati-
cally when the annular
preventer is closed.
20'
:CI~DUCTeR
"DETAIL"
20Z60102~ 3
,
8~
9.
lO.
13.
:14.
16.
18.
~:ctmilator Capaci~ Tes~
1. Check ami fill acctm~a~or reservoir to proper
level ~h hydrat~ic
2. Assure that acct~ulator pressure is 3000 psi with
1500 psi downs:ream of the regulator.
3. Observe time, :hen close ail units
and record the :Line and pressure re,aLining after
all units are closed with chart, rig pt~p off.
4. Record on IAIX: report. (The acceptable lo~er
is 45 seconds closing :~e arid lZO0 psi remaining
press~e.
13-5/8" BOP Stack Tea:
1. Fill BOP sr~ck an~ m~n~old with a r~n-f'reezing
I. Check that all hold down .~rews are ~lly retracted.
Mark ruraxing joirm with predetermined plug seating
d~:~th. Run test plug on drill pipe a~d seat in
3. Close armaAlar preventer at~ ups:ream valves.
4. Ra~-:i~ly test chokes.
-$. -In each o£ the following :esr. s, firs: hold a 2S0 psi
low pressure test for a ~ of 3 mirmmes, then
test at the high pressure.
6. Increase pressure to 3000 psi at~ hold for a
of 3 mim~es. Bleed presume to zero.
?. Open atmular preyer:ret ar~ close top set of pipe
r~s. Increase pressure to 5000 psi an~ hold for at
least 3 mmmes. Bleed pressure to zero.
Close valves directly ups:tel of chokes and open
chokes. Increase ptesstm~ to 5000 psi sad hold for
at lea~t $ ~s. Bleed pressure to zero.
Ope~ top set of pipe rms thee close bo:toe set of
pipe rams. Lta:reue pressure to 5000 psi below the
botts, set of pipe rms ar~ hold for at least 3
Test regaining:ax:es:ed mami~old valves (if an~)
with 5000 psi upstrel of valve ar~ zero pressure
Bleed pressure to zero. Opera bo:toe set of pipe
~ack off rum~ joint and pull out of hole. Close
blind rams a~d test to $000 psi ~xrt at least 3
Blee~ pressure o~f all equA~rt~. Open blind rams.
Make sure manifold and lines are full of
freezing liquid and all valves are set in drilling
position.
Test standpipe valves to 5000 psi.
Test Kelly cocks and inside BOP to 5000 psi with
Check operation of Degasser.
Record test information on blowout preventer test
form. Sign and ser~ to Drilling Supervisor.
Perform ~lete ~ :es: once a week ar~ func-
tionally ,perate BOP£ daily.
9
Revised 2/21/84
ARCO Alaska, Inc
Post Office ,.,ox 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
May 20, 1985
Mrs. Elaine Johnson
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Conductor As-Built Location Plat - DS 4
Wells 21-24, 17-18, 29
Dear Elaine'
Enclosed is an as-built location plat for the subject wells.
you have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU6/L112
Enclosure
If
ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany
LOCATED WITHIN PRO .ACTED
SECTIONS 26 ~ $5,T. IIN.,R. 15E.,
UMIAT MERIDIAN, ALASKA ~
/ .' ~s.,, ~: ~%. , ~O.s. 4/
I e24 ! ~ . liN.
,. ®18 !
i ----® 17
ac NO SCALE
~ ~ ~ ell
~ 6i ,12
e26
' el4 ~ WITHIN SEC. 26
·28 4.2~ I Y: 5,95:5,024.76 L AT.'70o16'2B.7426" 205 F'.W.L.
I
I I / ' uJ · 29 X= 71:5,001.22 LONG.·I48°I6":56.694" II 47' i-.S.L.
~- ~ I~ > ·:~0 CELLAR BOX ELEV. ·19.7
ii/ 7'
, 60 > ac ·:51 4.22 Y= 5,952,966.67 LAT.=70°I6'28.1675'' 21 F.W.L.
ac m e:52 X= 71:5,015. :54 LON~= 148° 16':56. :5:51" 1089' F. S. L.
/
5o m i ~ ~ m ~[ CELLAR BO× ELEV.= 20.4
I · i w
J 4 e ac I- * 4'2:5 Y=5,952,90 8.25 LAT.=70e 16' 27.5892" 2~:::)' F.W.L.
' m - ac X= 71:5,029.67 LONG~I48°I6':55.96Z" 10:50' F.S.L.
u) ~' i CELLAR BOX ELEV.= 21.6
w
, 4'24 Y=5,952,849.85 L AT.:70°16'27.0112'' 242' F.W.L.
20 ac: ~ CELLARX= 71:5,045.70BOX ELEV.=Z2.0LON~=I48°I6':55~:~)2" 971' I-.S.L.
I · 4-18 Y=5,952,7:52.98 LAT.=70°I6'25.854:5' 267' EW;L.
X= 71:5,072.15 LON~=I48°I6':54.870 ' 854' ES. L.
,. CELLAR BOX ELEV.= 2:5.0
4'!7 Y= 5,952,674.99 LAT.= 70° 16'25.2801" 279'
X= 71:5,086.06 LON~=I48° 16~4.51:5" 795' F.S.L.
CELLAR BOX ELEV.=22.8
NOT E S w, T,,N SE C. :55
4'2:9 Y=5,951,62:5.46 LAT. =70°16'14.8909' 261' EN.L.
I. BASIS OF LOCATION IS HON. 4'A X= 71:5, :540.54 LONG.=I48°I6'27.97:5' 50:5' F.W.L.
AND 4'B PER H.V. LOUNSBURY 5 CELLAR BOX ELEV.=$0.7
ASSOC.
2. BASIS OF ELEVATION IS MON. 4'B
PER H.V. LOUNSBURY & ASSOC.;K4' ¢ .,
:5. ALL C'OORDINATES SHOWN ARE . : .'
.~S.R ZONE 4. ~,~,v3... ~ . '.'*~ PROPERLY REGISTE'RED AND
· ......... :...~
LEGEND .: :~':.:;~.. ,~..lr ~.~--., SURVEYING IN THE STATE OF
~ ?' caul) O. m~ ,~ ALASK. A AND THAT THIS PLAT
O EXIST./FUTURE WELL ~-, - {.., . LS- 62~29 .~ ~ REPRESENTS AN AS-BUILT SURVEY
--,.~ ~,~-:~,,,&.;...... ....,~.~,a, MADE BY ME, AND THAT ALL
· CONDUCTOR AS- BUILT ~,,.(;/,. ... , ,._.~' ,~
. q . .-' .e. DIMENSIONS AND OTHER DETAILS
ARE CORRECT, AS OF: 4-21-85.
II I
i:ICO laska, In¢ ,
DATE 5' :5 · 85 . ·
,,, Subsidiory of A/tlontic Richfield Compony
JOB NO. 7214 NORTH SLOPE DRILLING-PRUDHOE BAY
CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
(1) Fee
(2) Loc
[2 th~u 8)
Lease & Well No.
YES NO
1. Is the permit fee attached ...........................................
Me
4.
5.
6.
Ye
(8) '
(3) Admin ~ ,/'~f~ 9.
(~ thru1212.)__ 10.
~(iO and' ' 12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
(13 thru 21)
(22 thru 26)
Is well to be located in a defined pool .............................
Is well located proper distance from property line ..................
Is well located proper distance from other wells ....................
Is sufficient undedicated acreage available in this pool
Is well to be deviated and is wellbore plat included ................
Is operator the only affected party .................................
Can permit be approved before ten-day wait ..........................
Does operator have a bond in force .......................... . ......... ~K
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate ..................................... ~
Is conductor string provided ........................................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings',..
Will cement cover all known productive horizons ..........
Will surface casing protect fresh water zones ..i..il.. i~i~.~, i'
Will all casing give adeqUate safety in collapse tension and burst
Is this well to be kicked off'from an existing wellbore ...... , ......
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is diverter system reqUired~
a eeeeeeleeeeeeeeeellee,eeeeeeeeeeeeeeeee
Are necessary diagrams of dtverter and BOP equipment attached..~ .... ~
- Ze t to ·
Does the Choke manifold comply w/API RP-53 (Feb.78).7 ................
Is the presence of H2S gas probable ..................................
Additional requirements .............................................
(6) Add: ~,~.~.:].~..~l.~
27.
REMARKS
rev: 03/13/85
6.011
,.
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
O ·
Company ,,
Lease & Well No.
ITEM APPROVE DATE
(1) Fee
(2) Loc /rjr.
8)
(8)
(3) Admin ./~,&---~- 1-/~-~ 9.
thru 112' 10.
zt_
(10 and ~12Y 12.
'(13 thru
(5) BOPE
'(22 thr~ 26)
(6) Add:
GeologT:
JAL ~
z~
En~ip~eying:
.c's
HaH
rev: 03/13/85
6.011
1. Is the permit fee attached .........................................
YES NO
2. Is well to be located in a defined pool ............................ .J__e_e~ . .
3. Is well located proper distance from property line .................
4. Is well located proper distance from other wells ...................
5. Is sufficient undedicated acreage available in this pool ............
,,
6. Is well to be deviated and is wellbore plat included ................
7. Is operator the only affected party ........................
8. Can permit be approved before t en-day'w~it ii. iio i., . i ....... ~--
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
REMARKS
Does operator have a bond in force .................................. ~
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate ..................................... ~__
Is conductor string provided ........................................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ... ~
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones ............... ' ........
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is a diverter system required .......................................
Are necessary diagrams of diverter and BOP equipment attached.... ' iizz~
Does BOPE have sufficient pressure rating- Test to C~z~ psig
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
Is the presence of H2S gas probable .................................
Additional requirements .............................................
Additional Remarks:
..... iNi'TIAL GEO. UNIT ON/OFF ....
POOL CLASS STATUS AREA NO. SHORE
.........
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
LIBRARY TAPE
CURVE SPECIFICATIONS
Company ARCO ALASKA. INC ......
.... :-' ,i:':, ...... .
w,n "-":'-' ' :'"'"' ''~-~. s'..'4:~'7.'--":~': .... "' '-'-':'-' ':--:" :- :~,. - : ~- '"
County, Seare NORTH SLO?E, ALAS~ Dare . 2/17/86
..
Curve Name
(Abbrev.)
Standard CurVe Name
Logs Used Scale
GR1 ..
SP
AC
RFOC
RILM
RILD
CN
DENP'
CORK
DEN
CAL
GR
GR1
S~
AC
RFOC
RILM
RILD
CN
CORR
DEN
CAL
GR
GRLG
' MAIN PASS
GAI4MARAY -
SPONTANEOUS poTENTIAL
ACOUSTIC
RESISTIVITY FOCUSED
RESISTIVITY MEDIUM
RESISTIVITY DEEP
COM3ENSATED NEUTRON
DENSITY POROSITY
CORRECTION
BULK DENSITY
'CALIPER
GAMMA RAY
REPEAT PASS WITH GR to 3500'
GAPR4A RAY :
SPONTANEOUS POTENTIAL
ACOUSTIC
RESISTIVITY FOCUSED
RESISTIVITY MEDIUM.
RESISTIVITY DEEP
' COb~ENSATED NEUTRON
CORRECTION
BULK DENSITY
CALIPER
GAbIMA RAY TO 3~500'
DIFL/BHC/AC
0- 100
·
-8O - 20
150 - 50
· 2 - 2
!!
CN/CDL 60 - 0
-.25 - .25
2- 3
10 - 20
0- 100
DIFL/BHC/AC 0'- 100
" -80 - 20
. CN/.CDL
If
!! '
If
GR LOG
150 - 50
· 2 - 2.,..0.00
11
60 - 0
-.25 - .25
2 - 3
10 - 20
0- 100
0- 100
PAG: 1
D4TE' 2/18/~ TIME: 10'~t:3t.
4;~C~ 4L~SKA 4-17 ~--' A/~... ~'/'~' ~ ' ~''
PRUDHO- BAY NORTH SLOPE, 4LfiSKA ~' ...,¢r .
~ ............ ~,,~,,,:~,~ ................................. :-:,~-,,,r ....................... :~::~:,::,-~ ................... ~?,:~m:?-:-~: ........... ?~;::~`~````````~`~``~`~`~":~m:`::;:```~"``~`~`~s~::~:~`~`~``~`m:~`~:~:rm:```?`?``?~``~:~;`:`:````~```"~`~`~`:`~`:```~```````~`T.``~`~`:~````"~:`:```-~`:`~``T`"```:``r::``r: ............ ~':':t":'"': ................. :': .................. '": .................................................................... ~;; '~ .... ~ ' ''~ ' ~ '"'" ...... m ...............................
?? T~'-"¥3¥1"1 ........................... 3';09' ..................... 2';3'0 ................ '1'5'~"3'6 .........................
~-~,~--'-,~-~,y~, ............. ~3~'?~'~'~'~i~"~~'~ ....... ~-"~¥¥~:z~~-~-~ ........... ~'~'~T-¢?''~''~' .................. z'~'"~'-3 ........................... z':7-~ ............................. z'"-;'"7"8 .................... ?-':'~ 7 .............. "~'s-";3'"~ ..........................
~?::: ' ':"T~2-~'7'~ ................................. 2'"-; '73 .................. 2 ';-5-0 ............ '-15-~'"3'~ ......................
.~:~.--.~~.~:~,:~ ::~2~~`~`:~~6~`~`~~;~`~.`~.~.;¥~---,~.~.~ ................. ~-~.z---;.---~-,~ ............................ z;'-'~"~ ........... z:~"s .............. ~ ~'";3'~' ...........................
~:7
~'~'~'~'~'~0~'~"~~ ~:~
'~ ~'~ % ~';~:: >~>~::~:~'-'"'~;~';~ ;~'~'::~2--78~6%¥~,'-" :..~-.~'~;-'80 ....................... 2-¥7'8 ......................... 2-;"4-9 ................ ~ 5"';"-I"~ ......................
2-2'~-8' .............. -1"5";-2'0- ....................
.... 2'-~'-2-'6 ............. 2 ," 5'0 "-15' ~' 26 ............................
. : .'5'1 ..... 1 5.-2'4 ...................
: . ;-'-"Z';'-'~5 ................. '1--'4';'-89 ........................
~ 7 ...... 14,79
~";"53 ............. '1'-~'-;-60 .....................
........ 1 '4';--5'3 .......................
~'";"0'0 .......................
I · Zb ......... Z ;"33 ....... 13,63 ...............
. Z 8 1,20 "7¥3Z .............. '1'3;"~'1 .......................
..................................... 1' '; ?3 ............ Z', '3"'8 .............. 13 ,"7-~ ..............................
~,.~-""-~-~'~. -'.' ......... ~ ~,?~?-~.--~.~-'~."~ ........ ~'~.--~.~'~'~-'-.-~?~'~,-' ........... ~'.~ ............... ~-~--~'-~"~-,.~. ........ '?~ ~'.~ ............... ~-~----'-~-~-~'-~-": .................... ~-.,~-'~- ?.-~"'~'~ ...... ~;~?-'~'~ '-"'~'~' ................. '1~3Z .............. ~,%'~ ................. 1-'z";'9~ ......................
? ~::~';:'5'5 ................. Z¥52- ................. 2' ;'"~0 .................. 1'3'Z8~'-" ...................
~,,~,~:~-y-~-~,2~,~,~¥:~~.~ ~-~;~?~,~~,~0~,~,~,~'~,~,~-.~¥~-~.~.~ ....................... z;,-'~-,,~ ............................. z-'~' '~"-o ..................... z";'"~'~ ~ '~"";"~. o ......................
~: ~ ::~-: ? '~ ~-; ~: ~ ................... ~-s's- ............... z ";~' '~ ................. '~'~- ¥~- 3 .......................
~:~::~:~:;~ ................... ~' ...... ~ ..... ~'"~ ~ ' ..... :~'~.
.`~`~:~::::`:~:~::`~::~..:~::`::~`~.~:S~:~::~:~:~:.:~:~:~::~..:~..~:}~`~.~:~.~:::::::~:`~:~....`~.~:S~:`~:~:.`...`~:~?~.~:~:~.:~:~:~`.~:::::::::~::~}`~:~:``.:::~:~~1 5. ~' ~. '~9 37.90 ]~.29 3.7~:?::~:'~:'~: "~:~:;~'"' ::z:~.~.~z~.~..:,._.~:.~.::-2.74,-:'~"- "~"-":"'~':~:':'::::--'"- '2.38 ................................................... ~.32 'd.38 13.8~' .............................
~"-~':::~:-;"-~':~'~ .................... z-;'~z ...................... z~""~-'~' ................. ~-~-';"'~'~ ...........................
~ ~ T:~T~m'~::~-';'3'~ ....................... Z¥5'~ ....................... Z'~"~'~ ............. 1'3";'8-4 ........................
~ ~:~;7~37T:-'¥-Z-'~"3'~ ........................ 2¥33 ........................ Z";'-~' ~ .......... 1"3 ;"87 ...........................
PAGE
DATE: 2/18/86
ARCO ALASKA
PRUDHOE BAY
TIM:: 10:41:31
~-17
NORTH SLOPE, ALASKA
2.45 1 3 · 72
........................ 2'7'~-2- ...............
2.44 13.46
2.02
25 2.17
~3'95, ~ ~'l ~ ~ ~ ~ , ~ ~"~ · 0 ~ I 9 i-0"5 2-~ ~i~3':2":;: .:: ..:z ................. :......:: ................... 2,~ : ......................... 2,~7: 13.72' ..........................
~ ""72'; ~8':Y:~ ...... :7"":2";"32" ................. 2';"'~'7 ................. 1'3"';73 ..........
~.=.,~.:.~:~.~z~:.~:~:::~=~ ~:~ ~;~`~:~~:.=:~`~.~:1~:~.~=.:~:~`~`~.~::~..;¥~..=`~`::~:..`...~?`;.1..7`...::: .............. :'~':'"2"?'2 ..................... Z';'~'"~ 1 3,7'3 ......................... ~'~
~::~' 7'~TY~7:~?=72-7~V': ......... '"'-'~-J'~-"~ ............... T3;"7~ .......
'~:~737;: ~.,;~,. ~7~7;~..;~ :~;~ ~.-;;; ~, ~' ~, ~ .. ::~;~,,. ~. ~,;. ,~T ; ;~7~:. ,:~ ~:'.?'"-"~'77 ~?'-"~'""'~ -"' ~ ...................... , ..................................;'~ ........ '"'"7 ......
~:} 7~ ;~ :--' ':7~1' ;-~'T ' 777~'~"71-;' 8"9-' ................... Z;"'~'7" .............. 1'3";'77': .........
=",~-=~-,:~,'~;:~<<~;~='~=V~:~ ~:~ ~<~ ?~.'~'<<~,'~=?f~=~-.-.-~...'~<.~--z;O~'~--~-~..-,-,-~ ................. 2.,;-o.o z';"~'~ ~3';"7"~ ...........................
~ ............ ~""2'";"'~'8 .............. 1'3";'7'8 ......... ;"'~ .......
~7 '~ ~;~'.: "~t ~7':'- ':7'~'~ ~' 9'37'::'~'"""T;:8'-6 ....................... 2';"'~'Z ................ 1'3';"7'5 ...........
DATE: 21181~H
ARCO ~L~.SKA
PRUOHOE BAY
TIME: 10:41:31
4-17
NORTH SLOPE, ALASKA
~GE 3
.................. 'O-'H"M ......................... O'H'M ........................... G'C'-C ...... i'N";
.................. 1,92 .................. 2';'-44 ...... 13';-5~
?:?T:'--':::T,-7'3 ............................ 1'"; 7-0 ..................... 2"-4-'1 ................ 1-3 i-"5'"~
1.9 8 1.. 3 2 · ~ 5 1 ~ 7-'5'~
~'~P"-~¥-7:'~:~;'5'7 ...................... -T-;"5~ ................... ~"~' '6' ............. I-3-',%7 ....................
.............................. t:--'s--z .............................. 1---;'-~'"~ ........................ z ;"~ 3 ~ 3';'~'~
Z ................ T3":7~
..... 1"-:'"~"~ ...................... Z"; 4'"1 ........... 13"; 'g'~ ...........
5 ............. ~3-';-99 ....................
0 2'-,~ ~'
~ 13 ;'95 ..........................
........ 2':'"~'7 ............... 1-'3-:-5'6 .....................
..' 2"; 47 ......... 13',' 83 .....................
~ ............ :' ....... Z;"~'9 ................ 1"3;'-~"6 .....................
~'7 1' ~ ;' 5"~ .............
C:~:}~ ~.;~]::~;~:~'~:~.:~/""; ..... Z';'~'~- ............... ~'3;"~'0 .........................
~, 6 ~ .... Z-';"~'8 ........ 13; 77 ...................
.97 I. 81 --Z;3'0 ............... '1-'3 ;"8'0
~. Z'~,""5'1 .......... 13 ,-8'5 ..............................
'-":'-'2' 7~3 ..................... 2"";"0~ .................. 2";' '~' 9 .............. 1" 3' ;'"5-~ .....................
:~::~:'z~'~:~'?:::-'-::~"-;~'~ ..... ~ ......... -~-';"~'~ .................... z';'~'-~ ............... '~ ~-;'s'~ ......................
- .<'T.-'8~ 1.8 ~. ~. ~"7 ............... 13':70 ......................
:T717 ...................... T;"'~-8 ...................... -2';"'~-~ .................. 1'3';"2-8 ...................
................... 1"'"':'"'2'"'1 ................................... 1' ';"1'1 ............... 2 ;'~ ~ I 3 ,'27 ...............
~?~'T-"~7'T-~"~'~ ....................... '1'; 3T .................... 2 ';'~'"8 .................. 1'3 ;'2"6 ...........................
7"-":~'T; 3-8 ........................ 1'":30 .................... 2-:'"~--~ ........... :'""I-'3; "2 7 .....................
"-'-'1--:--3"~ ............................ ~'"'; 3'o ' z";"~ 1 ~ ;'~"o ................................
"t-~"~7"; ............... :"'1'";"~'0 ................. 2'~ '~'1 ............. ~ 3",3"~' ......................
:-1'-';'"~'3 ........................... 1 ;3'~' Z, ~ 1 1 3~'37 ...........
~:~?~3:~:~":-7-T'---~7:2 ;':TZ ......................... Z";-'03 ........................ Z ':"50 ........... 1-3';'3'~ .....................
............................ ~-";-'-~-o .............................. ~ ;-'~"z z'; ~ 2 ~ ~'~ ....................
DATE: 2/18/86 TIME: 10:~1:31
ARCO ALASKA 4`-1 7
PRUDHOE BAY NORTH SLOPE, ALASKA
~ ~ ~:'""~;28:':~: ............. ="~:'J':35 ........................ -2";'-'~"~ ...................... 1-'3';'"'2'3: ............ : .........
?? t?~ ;T 38-~ 7'-"""T;' 3"5'"-: ................ 2-;'-4"6' ................ T3'¥T9'': ........
....... ""'"'2-;'3T ............ ]'" T3;-'~ 23 :'"'-":-:T'7
: ......... 72-';'~7':'~ ................. Z-;"3'~' .................. 1"3";"~"1'~ ......
........................ 2';"'5'0 ................ '1'~:¥2~ .......... ~'~: ........
~:'~:~'~'~¥~:~'=~::q~:~ ~7~=~==;3'~;':~o--'::~-~--=i-;~'~'=':'~ ........................ ~--:-"~'~ ......... : ................. z;'"~"~ .................... ~3",-"zo
'=~':~ :~ ~:~ ~=~==~;~'~=:':'~'~ ~: ='~:%'~ ¥"-~ ...................... ¥:-'-~-~-" .......................... ~";'~' "~ ................. ~'-3--:-'~"~ ...........................
~.~ ': ~"7'7: T'"":=::2Z~';~'=": ............. ~'-;--4-i ................. T'~"Z2'~ .......... :':":"-~
........... ~ '~'~':~: :::~ .......... ~i~' ~;~ ............... ~'~? ............... ~z~ ................ ....... :~? :~:~ ~:~ .......... % ~ ~' '"~' ......................... '~';:' '3~"~' ................................... 2'-;'"~-~ .............................. ~ "; '3' '-~ ........... ~ '3'";" 2' '~ ..............................
Z.44 13.Zl
~-'~ ......... :-': .........
~ 'i3'22'$ .....................
: ...... 2-;'~"8 ~ '~";"~' .......................
................. ~'3 ;'3'~' ................................
1. ~ Z '::'2'-;-5"1 1'3";"'30 ..........................
55 I · '4 ~ ..... 2¥5'2"': .......... 'T3",-2'8 ........... ::' ..... ""
DATE-' 2/15/86
ARCO AL~SK/~
·
PRUDHO~- SAY
TIHE: 10:~,1:31
4-17
NORTH SLOPE,, ALASKA
~:? '~?:"'~::'~T: ~:::::?::: ::':"::':~:;;~'.: ::~:?:!::?:~ ........ :": ..................... O"H"~ ............................... ~' C"C .............. I~N~; .....................
====== ===================================:.~':: ::. :~i~L:~:'.:~". 2::'.' L ~.'.' 2~..::':.'.~:'.' :'.'..~:.: 7 :.'~:.: 7 ~ .'.=~' ...~ ~'.': '~: ~'.'.~-"
~ :~"::: ~ ~?:;.~'~[:' :?: ~::~: ~2¥3"~'7" ::'"-":':':' 2¥Z '2'"':: ............. 2'"; 50 ................. 13':'; 37 ..............
.......... :'-'::3¥1'3'-":"~ ............ 2"';"5'3 ............. 1"3¥88 .........
~;~"T-':'~: ~: ~ ~'~:~:~%:~: :~:':~;~:: ..~ ~:~.~::..:: ..:~ ;?:~: .~:~ ~?::~::..:~:~: .~ .:~:~;~:~ .~:'% ~:'~ 'r~V~4~FP~'?~..:..T;:~' .~ ;~:~7~-'"~ ~: ':':~7~ '~'TTT': ........ 7F~'~ ....................................................................................
'~-~"~"~'~'~::~;~'~'~*:~*f ~'~:~-~ ~' :'~::-~'~:%~¥-'::~"-":~'~ :Z?~8~'~-'''': ........... : .......... z-:'-'~o .................... 2-;-s's ................... ~-'~":-'o-~
';38 ............... T3¥3U-
!'"; '5'3 13"'3"0
': ...... 27'5'6 ............... 13¥2'1 ....................
'5'1 .................... 1'3';-'1'8 ........................
~ ::"'"Z';'~ 9 13';'16
"~'8 ............... 1'3'~"1'~ .....................
Z";'~ 3 ~ 3"J17 .........................
"-'Z'";'5'~ ................... 13";'Z'1 ........................
3,1 Z ..... Z";~'6 ...... 1'3';'21 ............................
27 3.03 --'2';%"~ ............... 13';'1-9' ....................
_ ;"C'3 ............. 1"3 '~ 1'-'9 ..........................
/~ ?~ :::::::::::::::::::::::::: .... :"::~j6"6'"": ........... Z";'~'5 ................... 1"3~'T8 ......... ':':'
~:~:~,-' -~;-~~~.~~:: ~'~:f ........... :'"-'~'%-"~-~ ........ : .............. z-'~'~'~ ~'~;'~'"~ ~ ....
~: ~:~ :?S"'::::3'77'~'7:~:,'"?J'-; '~0 ...................... 2';-:5 "2 .................. 1 '3 ';'2"1 ': .........
~::~::~'~'~i~:~::~:~::~'~:~q~:~-~¥~:~:~:~ ~'~ ................. ~ ','~"~ '~ z ~"~"~. ~3" ;3 7 .............................
~?;~ ~;~;~:: "::7 ': '" :; 3 ;;' '9' 2' ::7'"'":'"'7"3';:~' ~"Z': .................. 2' ';"5 '2 .............. 1-'3";' '-4"4 ..........
~:~:~:~.~:~f~:~:~::~.~.~:~. ~.~.~.::~~:~.~:~~:~:~:~:~.~:~. ~.~..:~:~:~:~.~:>-~.~:~:~.~z--~.~..~--~:;~3,-..~:,.,:, ..... :..~.-~..;..3.~ ?-~.~- ~'3,"~
¥~ ~?:? ....... ::'::5':;'03 .................... Z';' "58 ............ 1 "3"~' "~ '~ .......... ~'":--" ~
P.~GE 6
D~TE: 2/18/$6 TIME: 10:41:31
ARCO ALASKA 4-17
PRUDHOE ~,-~Y NORTH SLOPE, ALASKA
?~::.~ . ~ . 3 · ~ 8 3.6 ~ Z. S 3 3"~"~"~ ..........................
;~>~:::::-::~:~-:~:~? ....................... "~' ?~"~:~:~: ............................................ ~ : ......... ~:~,, ....... ~?::~:~,~ ~:.~:~::~.:~:.~:.~:~_~.~:~:~:~.~ ~,t;..;~:~:~:~:'.;::~?~::~:~ ~:,.:::::~.~::~._:..'~':':': ........ :':3;'5'~'. . ....................... 3-;'5-0 ...................... Z';'5'I .............. ~'3,"49 ........................
'~:":::'-::~:"~:~:~¥~:-7~:~::'-~:~"~¥~:~::?:~?~:'~%'~::';'~~:~':':~ ............. ~~"~- ......... '~'~"~~ ....................... "~"';"~ ..................... ~"-;'-z~' ......................... z-~-"z ~ ........................... z' ;"5'z .............. ~-3'-;-~-~ ..................
??'~ ~' ~' ~ ~'~' ~-'~'~?: ~:"~:~ '~.. '~~ ~:~":~ ~:~:~' ~ ~' ~: :~r:~:~::~ ~:~'~ ':?~:'-"':?T';'"' r3 .......................... T'~"SO .................... 2'-;'5'~ .................. T3"~-5-~ .........................
.... ._._ .............. ........................... ........................... .................. ......................
??¥~:~-';:~:~- .......................... ~"';'-~--s' ........................ -z;'-'~-'~- ............... ~"~-;-~-~ .......................
~ ~?~::'~}'~"~:;~:-'¥~ :'-"--'w;-TO'- .................... ~";5-1 ........................ Z-;"5'2 ........... T3"'--~-9- ....................
~ s}?~:~ 7':'?~' .......... '""W~"~9' ......................... ~'-;7'0 ........................ 2' ~"~ 0 .............. ~ 3';"5'8 ...........................
:~--:':.%~:~:;~.~:~:~ ~:.~.~~: ~:~'~ ~?~ ~"~;:~:~'~-~-:--'~'~:~'-~;¥?:~-:~"~' ................... 3'-';-'~'-~ ............................... ~'""~c~ ................. z","~-'~ ~ 3;3 7
~ :~ :o-¥-: ......... ~";os ..................... ~'-;--~'~ ..................... z':'"~"~' ................ 't~'"~"~? ...................
'~'~'~'~¥~;~:~:~:~-2~Z~'~~'~'~ ~~¥~-~~0-"~'~ ~' "~¥'~'-~' ................ :-'~-'¥;-'~-'z ................................ ~'-':"o'~ .................... ~'":'~' ~ ~-s-,-~'~ .......................
~'";-0'~-
4-4' ............. 13"~'-07 ......................
1 3',02 ...............
~"I' .........................
..................
; 54 1 2.97
"0 ................... 12' ~"97 .....................
.'S l"Z ;"9 7 ..................
................ 1--2-;""97 ......................
6 . 65 .... 2"~"3 8 1 2 ." 97 ........................
88 6 . 91 "'2'~'3-1 ............... '1--2';-'97 ......................
2'"," '~'3 ............. 1 2197 ...............................
· .:~, ~s~S~. ~:~ .~ :.~. :s..;~?~ · :.:....'~.~.: ::- ':~:.' ~:... ~..- '~ ~S~~ ~; : ;~:: · ~'; ...... ........................................................................ ~
~c?-:--3'~7z .................. z¥~-7 ................... ~";'~'"z ............. ~' z' ';-~7 .....................
:~..~--.,-:~:~.:.~:::3i~:~.~:~.~:-:::,~,,~~~-:~ i.~.~:~ ~S~ :~.:~'::~:~:~-~:~-:-¥9-:--,:-:,,: ............... '~--;-0-.~ .............................. "~'-";'"~-7 ............... z'",'~ ~ ~ ;"~7 ...................
':'~?~-:"'"'~:'~¥~9 ................... 5'~'22 .................... ~¥'5"~ ................. T2'~-9"'9 ...................
,..-~D:~::~.~,.:~.::.,~.?~ .... .~.:::~% .~:::~;~:::,:,~,:~ :~:~8:. ?,.:::~_~:~.~.;:~:,~ .~..~:. :,:: 3.30 3. ~ ~ 2. ~ 1 3.0 7
---'.::,,.:-,-~--:::~:~:T~':5-~,'~::~:.'-W,~:.~:~? ~:.%?~:~::'~--:-~'~:~'~¥s':'?Z~ ....................... :~:~'~:7~.~;:~:-':~-'~:::: ........... -~:~'~VO':s-:~:--:';' ......................... '~'--~')-~ z":7"~ ..................... z'~'~o ........... i ~'~"o ~ .................
~:~'-?'~'-~-~"zo .................... 3'-;~-'0 .................... z";'5'o .............. ~-3-~'o"z .........................
'~:~:::~:~'~'~':~:~'~:~'~.~:~:~::~'~:~ :~ ?~: ~ ~:~:';~'~5~::'~:~:~:~:~"::::::::~:~::~:';~':~'::':-~'~:':' ........... ':~":'"2-'~"8'8 ............................. 2-";"'8'6 Z'"4'5 1 2'" 8'~ ..................
~~ ~ : ~; 2';'7:: ....... ::"3'~'"~-9 ............................ 3"~'"T~ ....................... 2'-~'5-Z .............. T2'~'"88 .........................
DATE: 2/18/86 TIME: 10:41:31
ARCO ALASK~ 4-17
DRUDHOE BAY NORTH SLOPE, /~LASK~
PAGE 7
~:~.i? ~' ~ ~iTi !~':181'~2"';'ii'ii::i'' ......... :"'" '" 2" '~'7"'1 2"-~"'~"7 .............. 1"2'~-6-"9 .............
..................... ~-'-;-~-o ................... z';-'3'~ ............. ~--'z'~"5"~ ...........................
¥"~::~?C~T~:~0:~'~:~¥: ~ ?'7~¥ -'~'~ '~'": 5"~'~ ~'~'~O- ~' ~' ': ~" -"~"~: :Z:O':''''': .............. ~"-;':'Z2 .................... Z'-;'"'~? .............. '12'" ;"5'
~? ......... 9'8¥3'5 .................... 'Z'-~"-17 ............... '1'2~"22''~ ........
~'~'~'~'~'~'~'~'~'~ ~S~"~';'~'~'~"~'~ '~'~'~,~'~'"~'~'~'~'~~ ........... z'-o'~'-":'z"~: ..................... ~ :o'~' ~" ~¥~'-'~ ............................
~:~' '~:~,~ "'~T~; 5"I'" ?'---1:"4"~";::6'0 :~' ................ 2'~-'3'Z .................. 1 '2'"~:'
'~"'~'"' ~,~.~?~.`~`,`~,,~,3~;~?~¥~`~,~~~ ~'~'~"~'~ ~;~o'~3~-' ~'~"~--;'~'-~-'-'~'"-"3'~-z-;"'~-'3 ..................... z":~"~ ............. ~'z":'z'3 ......................
¥~CF:F~'"'-'5? 3 '~ 52: ~ 'F:'"2:9'9¥'53 ...................... 2" ~'"1"6' ......... 1'2"~'"2-3
~'~'"~¢~¥:'~"~"~'~"~""~ ~~'-~'~'~'~ ~'~'~%~-;'~"~-'~'~---T~-:"~o-~ ........... ~'"~--~-;~'~-'o' ................... 'z';-'z-~ ................... ~'-'~":-~"z- ....................
~0 :;¥~¥ ~'~ '~:~?~:0~8-;'3~9 :~' T"' :5::~'~:; '~"9":~',"3~'~'1-'~'"8"1:'''''~ ............... 2"~"15 .............. 1 '2';-2"2 ................
3~'~:~}3T~~ ~D~ E ~c}~c~:~ ~' ~T .~'.~:~2~:~ ~~ .~?~ ~ ~s'~'~s~S~ ~ ~3:~ :T~c?~F:~ 'T~ ~;~: ??-~:~' ~?T~?T'~:rT~}T~ T~::'~. "~ '~-' TT~TT~ ~::~ :~T?:~ :-~ ....... ~ ........................ ~ .......................... .............................. ~ ................
:'5¥~'-1-' .................. ~"';'"Z'l ................. -~"2'2'2"4 .........
_.~9~ ......... ~ 1~.2~ .............................
.... '~-~'"27 ............... ]"'~'~"2'5":
........ ~-:"~-0 ................... I-'2"'~'-~'Z .....................
..... ~'~'"6'3 ......... 1'3; O0 ....................
21
D · 9.65 ..... 2-;'"53 12';65 .................................
~"~ ......................... 2'¥"6' 2 1' 2' ';"
9585. 88.10 ~'T. ~ ~ ~-~'. 8 3 -39. ~5 7.02'~"~';"~'~'~ ~.50:~'":~' ~" ':'"~:':'"::': ...... '"'"'::':6.93 ...................................................... 2.37 13.0D
~: ~: .. :::.:t:~:.:::~. ~;~ :~;:;~ ~7~ :.:~ ~7~ .:~s~..~'.~5.~:T~. ~ ~t:~ .~;~;~72~7;~" .~ :.;.~.-.:~:~;:::~7:?T-:~~ :':--~"~ :?:'~ ....... T; ..... '-'" ................................ : .............................
;~ ~:~?~T" '~; ~3::: ~'--~3'0-;~::" ................ 7¥3'3 ............... 1-'2' 2'17 ...... :":T' '~
~??:'~ 0-'; ~5~:~? ;"'T'Og:3T'~'':'''''~ ....... 2';"2'6 ................. 1-2';"3":8 ...........
~"~ ~ ~ ~ F~2~:~}~",~ ~.~S~ . <~. ~'-~:~37~S'~; ~S~:~. '.~ST~3~T .;~T~'L~,:~ ~?T~F?~:~ ;~ ~ST:~ .? 'T~T~S"?F~ T'~:~'? ~: ':'"'~ ......... : ....F~:"~ T ............ T'~~
PAGE
DATE: 2/18/86
ARCO ALASKA
PRUDHOE BAY
TIME: 10:41:31
4-17
NORTH SLOPE, ALASKA