Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
182-034
• yoF Tg • • //7.-4'• THE STATE Alaska Oil and Gas ALAsKA Conservation Commission 333 West Seventh Avenue _--' Anchorage, Alaska 99501-3572 GOVERNOR BILL WALKER g 1�Q` Main: ALAgFax: 907.276.7542 www.aogcc,alaska.gov Jessica Worthington �E� A� 2 �� ; Well Intervention Engineer BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-09B Permit to Drill Number: 182-034 Sundry Number: 316-522 Dear Ms. Worthington: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy '. Foerster Chair DATED this alltray of October, 2016. RBDMs OL C L 4 2016 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N • APPLICATION FOR SUNDRY APPROVALS 20 MC 25.280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well H • Operations shutdown 0 Suspend ❑ Perforate 0 Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other Micro OA Cmt Sqz l3• 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 182-034 • Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development ®, 3. 6. API Number 50-029-20534-02-00 ' 99519-6612 Stratigraphic 0 Service 0 7. If perforating: 8. Well Name and N 'i.e What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No l3 PBU 14-09B 9. Property Designation(Lease Number): 10. Field/Pools: O C T 11 2016 ADL 0028314 ' PRUDHOE BAY,PRUDHOE OIL ' /0 l zv//6 11. PRESENT WELL CONDITION SUMMARY AOGCC Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11860 • 9418 - 11806 9373 11290/11350/11383 Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"94#H-40 31-111 31-111 1530 520 Surface 2699 13-3/8"72#L-80 29-2728 29-2711 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6#13Cr85 13Cr85 25-10888 Packers and SSSV Type: 4-1/2"HES TNT Perm Packer Packers and SSSV MD(ft)and TVD(ft): 10773, 8514 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary RI Wellbore Schematic H 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development RI • Service 0 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil 13. WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Worthington,Jessica be deviated from without prior written approval. Email Jessica.Worthington@bp.com Printed Name Worthington,Jessica Title Well Intervention Engineer Signature �,/�i pr - e +1 907 564 4281 Date 1 O`) I Me, / COMMISSION USE ONLY di Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 311 -522 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance ❑ Other: SSC kbIIt••• Post Initial Injection MIT Req'd? Yes 0 No <' Spacing Exception Required? Yes 0 No E Subsequent Form Required: / 0 4-04- ff9APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date/0- 2,0 l 047 U'T•L /0/2--0//4° APPROVED ORIGINAL RBDMS 1, 70C1" 2 4 2016 ioeiei / Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate 4 74--. !5 , / _.,, o • bp • 0 14-09 MicroOA Cement Squeeze Intervention Engineer Jessica Sayers (907) 564-4281 Expected Start Date: October 23, 2016 History 14-09 is a well that exhibits high OA pressure when on-line. The OA is cemented to surface. > 07/02/15: TIFL Passed > 08/10/16: OA BUR =-134 psi/day > 09/25/16: PPPOT-IC Passed Objectives Perform an OA microfine cement repair squeeze to remediate the high OA pressure when the well is on-line. Procedural steps Specail projects/DHD 1. Strap TOC and hot water/surfactant wash the OA, until clean returns are observed. Remove water/surfactant. 2. Strap top of cement in the conductor by surface casing annulus and fill, bottoms up, the void with microfine cement until clean returns are observed at surface. Pressure up with microfine cement until clean microfine cement returns are taken in the conductor or up to 2500 psi, bump pressure three times. Cap with 500 psi of nitrogen. 3. Wait on cement to cure. 4. POP well under evaluation. TREE= 4"CNV WELLHEAD= GRAY • 1 4_0 9 B IS NOTES:"*4-1/2"CHROME TBG*** ACTUATOR= BAKER C OKB.ELEV= 71' BF.ELEV= ♦4 4 1 .- 4 900' -19-5/8"HES ES CEMENTER KOP= 2300' 20"CONDUCTOR, -1 80' 4 4 -ng @ 4 •♦ 927 --19-5/8"BOT EXTERNAL CSG PKR,D=8.70" Max Angle= 56� 7100' 94#,H-40,D=19.124" �� ♦.; Datum MD= 11203' RK SLV,D=? - 9-5/8'T1�K CSG,47#, - 943' or 1869' H9-5/8"X 7"BKR LNR HGR w/T Datum ND= 8800'SS L-80 VAM TOP, Ni. ♦ , , 2122' --{ OS 4-1/2"OTX NP,D=3.813" D=8.681' �• 9-5/8"BOWFIN CSG PATCH,D=9.05" -{943'_947' "4 16TOP OF 7"TACK LNR I- 1869' �� • ST MD ND DEV TYPE• �VLLATCH FORT DATE V 13-3/8"CSG,72#,L-80 BUTT.D=12.347" I-I 2727' 6 3812 3602 48 KBG2 DOME BK 16 09/05/14 0. ►� 5 5674 4855 48 KBG2 DMY BK 0 09/05/14 Minimum ID =3.725" @ 10880' ►� 4 7454 5973 56 KBG2 DONE BK 16 09/05/14 � 3 8900 6950 39 KBG2 DOME BK 16 09/05/14 4-1/2" HES XN NIPPLE u ►� 2 9891 7738 35 KBG2 DMY BK 0 05/01/14 �� 1 10548 8310 27 KBG2 SO BK 24 06/30/15 7"TIEBACK LNR,29#,S0095 BTRS, - 7423' A .0371 bpf,D=6.184" .- 7423' H9-5/8"X 7"BKR TISK SEAL ASSY,D= a J TOP OF 7"LNR -I 7423' ____.7423' --I9-5/8'X 7"BKR LNR HGR w I TEBK SLV,ID=? 1 MfLLOUT WINDOW(14-09B) 7726'-7741' 9-5/8"CSG,47#,L-80 BTC,D=8.681" H -7726 ' If 10749' H4-112"OTIS X NP,D=3.813" ►-4 .— 10778' --I 7"X 4-1/2"HES TNT PKR,ID=3.856" ' 10812' H4-1/2"OTISXNIP,ID=3.813" 4-1/2'TBG,12.6#,13CR-85 VAM TOP, -I 10893' ' U 10880' H4-1/2"OTIS XN NP,D=3.725" .0152 bpf,D=3.958" / \ 10893' -14-1/2"WLEG,FE RFORATION SLI MARY D=3.958" REF LOG:BRCS ON 04/10/82 -{EMD TT NOT LOGGED ANGLE AT TOP PERF:35°@ 11128' Note:Refer to Production DB for historical perf data SIZE SIE INTERVAL Opn/Sqz SHOT SOZ 2-5/8" 4 11128-11148 0 06/05/92 2-5/8" 4 11168-11190 0 06/05/92 2-5/8" 4 11200-11210 0 06/05/92 2-1/8" 4 11240- 11274 0 06/22/86 , 2-1/2" 4 11240-11274 0 08/21/9111290' ,-.FISH-74'X 7"X 3-1/2'BKR SAB Fi(R ,� 2-5!$" 4 11286-11306 0 07/28/85 [ (RIG PUSHED DOWN HOLE 05/01/14) 2-112" 4 11286-11306 0 08/21/91 2-5/8" 4 11286-11306 S 12126/82 07/18/85 11350 - FISH-35'SWS TS 1-318"FN;1-11!16"OD; 2-5/8" 4 11312 11349 0 07128185 2 BOW SPRING TYPE CENTRALIZER(12/08/94) 2-5/8" 4 11312-11349 S 12/26/82 07/18/85 PUSH®OH BY RIG/BELOW PKR(5/1/14) 2-1/8" 4 11354-11384 0 06/21/86 11383' HASH-PERF GUN STRF 06/22/86) PBTD H 11806' ,••••••• r LNR 29#,L-80 BTRS,.0371 bpf,D=6.184" H 11861' DATE REV BY — COMIVENTS DATE REV BY COMMENTS PRUDHOEBAY LINT 01/17/82 PKR 191 IMTIAL COMPLETION(14-09A) 09/09/14 JMNJMD GLV C/O(09/05/14) WELL 14-09B 01/17/82 PKR 191 SIDETRACK(14-09B) 09/09/14 JMD PERFORATION CORRECTIONS FI3RMTNo:'1820340 05/04/14 D-14 RWO 07/29/15 RJK/JMD GLV C/O(06/30/15) AR No: 50-029-20534-02 05/03/14 PJC DRLG HO(EOW)CORRECTIONS SEC 9,T10N,R14E, 1991'FM_&89T FE 05/07/14 JS/PJC FINAL ODE APPROVAL 105/07/14 PJC PERFORATION CORRECTION BP Exploration(Alaska) • C.) Q o 0 0 00 0 0 co N ti cg:). CO LC) N Ln ((z",:)1 LO CO fCr ICr N 'Cr 'Cr Cr 1"-- CO 00 U N o 0 0 CD CD 0 CD L CO CO N- N- CO CO N LO 0) CO 00 L() N- V' V' CO CO N- CO 0) CO 00 N N CO CO N- 0) 'Cr CO N CO LC) C)) CO H C)) N- 00 O- CO LC) M N N M O O N CoCD (NI CO 07 LCI 00 ti V 00 co N (3) o o 1661 Q 0 O- N Lf) CO N N M 00 N CA = r • M_ W L() aCo CDooIC) L 2-1 00 00 (� JJOOD M = m = N *k4* OJ • � � - - *kC3-) N U O CO 0\0 0\0 N N L n U) C) CA I. 0)CaO CO Cfl CO (C) J N O CO in W Q Q C 0 W (21 U U O CCccctZ Z c W W W W m O D H I— Z Z D U (1) ZZJJF- • • a, N N ro M CO In Nr CO t O N N CO r M CO N M O LU Ln CO a) C0 CO CO O CO O N p a) CO CO 00 C) O) O O O CO CO CO CO C1) C) 6) I- a O O) LO N CO r CO IC) 4 t CO N LO C) N LO C. Ln CO t Cfl M l() O L1') o6 a 0 CO co co a) a co O) 0 0 > O co Co 0O CO co CO CO C) CA 0 W a cc 0 0 ow Z w w O w a) ~ Q J 0 w J Y U O mu) O O w Y Y CO 0 0 CO 0) Cr) r"-- N N J U U W W L O r` O 'Cr N- N- CO J J J Q QU) w c- (\I N CO CO Cr) CO CO < < < W a 0 a Z A� r .- r r _ Z_ Z U j W W - W 0 ▪ T- UU- N- r Z J J ca cQ Q Q = oJ J a W a U U U Z QQ< < O H O S W W W a < J< co CI) - OI a QO H = r t CO Co O O CO N V cr) N- Q N CO O CO r IC) N- N- O � O r a- N N N M M M M _ m Q c- r r- r r r = M � oM it 2 2 0 cn co cn cn w w a a, O U c LL LL LL LL LL LL LL LL LL is 0L 0L d 0L 0L d a a 0L a 0 t ar a a� I- co in co co co 0 rn CD rn CA C) CO CO 00 CO 0 0 c rn rn rn rn rn rn rn rn rn LU a Z LU O ¢ Nm t� 7 a- a- CO N N N W 0 U N N N N NN Z 0_ J UJ W W oa CO CO r� CO COCO m 0 ? w J J J a • Q a co U_ co a a a) E co CO CO CO CO m CO CO CO CO rn rn rn cm rn rn CS) rn rn 50 0 0 0 0 0 0 0 0 a a 0 LL N a' LL � vv �t � vvv � v m as ao JQ0w a < < co m a LL co co a a' Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, July 02, 2015 6:50 PM To: AK, OPS FS3 OSM; AK, OPS FS3 Field OTL; AK, OPS FS3 Facility OTL; AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Chou,Irwin; Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Regg, James B (DOA) Subject: OPERABLE: Producer 14-09B (PTD#1820340) TIFL Passed Attachments: image001.png; image002.png All, Producer 14-09B (PTD#1820340) passed a TIFL on 07/02/2015 following gas lift valve work. The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • A SSSV is not required Thank you, Kevin Parks SHIED JUL 0 6 2015 (Aitevnate Whitney Pette.c BP Alaska-Well Integrity Coordinator GINGGlobal Welts Y Organization Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Monday, June 15, 2015 9:06 PM To: AK, OPS F SM; AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lea , ismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL, GPB FS3 Drillsites; Chou, Irwin; AK, OPS FS3 Facility OTL; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; 'Regg,- es B (DOA) (jim.regg@alaska.gov)'; Sternicki, Oliver R; Pettus, Whitney; Weiss, Troy D; Morrison, Spencer Subject: UNDER EVALUATION: Producer 14-09B (PT 0340)TIFL Failed All, Producer 14-09B (PTD#1820340) inner annulus exceeded MOASP on June 12, 2015. Pressures were confirmed on June 13, 2015 to be T/I/O = 2110/2110/820 psi. A subsequent warm TIFL performed on June 15, 201-54,ailed, demonstrating a lack of two competent barriers in the wellbore. At this time, the well has been reclassified as Under:-Ivati.iation for additional diagnostics. 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Monday, June 15, 2015 9:06 PM To: AK, OPS FS3 OSM; AK, OPS FS3 DS Ops Lead; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Chou, Irwin; AK, OPS FS3 Facility OTL; Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, D&C DHD Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA); Sternicki, Oliver R; Pettus, Whitney; Weiss, Troy D; Morrison, Spencer Subject: UNDER EVALUATION: Producer 14-09B (PTD #1820340) TIFL Failed Attachments: image001.png All, Producer 14-09B (PTD#1820340) inner annulus exceeded MOASP on June 12, 2015. Pressures were confirmed on June 13, 2015 to be T/I/O = 2110/2110/820 psi. A subsequent warm TIFL performed on June 15, 2015 failed, demonstrating a lack of two competent barriers in the wellbore. At this time, the well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics:TIFL—FAILED 06/15/15 2. Slickline: Change out orifice gas lift valve 3. Downhole Diagnostics:TIFL 4. Well Integrity Engineer: Additional diagnostics as needed Please call with any questions or concerns. Thank you, SCOW JUL 0 12015 Whitney Pettus (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator GINO n:. WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator@BP.com 1 tiOFT�F • • • �w\�\\I�j,cV THE STATE Alaska Oil and Gas 71zi °fA LA S KA - Conservation Commission der, t=7- GOVERNOR SEAN PARNELL 333 West Seventh Avenue Op-di., Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1 433 �f \i 1 a; Z012' Fax: 907.276.7542 SCANNED Dave Bjork Engineering Team Leader BP Exploration (Alaska), Inc. I � 03 t P.O. Box 196612 (, Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 14-09B Sundry Number: 313-521 Dear Mr. Bjork: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair, Commissioner DATED this r7 day of October, 2013. Encl. FINED • STATE OF ALASKA ALASPOIL AND GAS CONSERVATION COMMISSION f' },J r 1 �iS APPLICATION FOR SUNDRY APPROVAL AOGCC 20 AAC 25.280 1. Type of Request: ❑Abandon ❑Plug for Redrill ❑Perforate New Pool ®Repair Well ❑Change Approved Program ❑Suspend ['Plug Perforations ❑Perforate ® Pull Tubing ❑Time Extension ❑Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate Alter Casing ❑Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. ❑Exploratory ❑Stratigraphic 182-034 3. Address: ®Development ❑Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-20534-02-00 - 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 14-09B • Will planned perforations require a Spacing Exception? ❑Yes ®No 9. Property Designatior 10.Field/Pool(s): ADL 028312&028314° Prudhoe Bay Field/Prudhoe Bay Oil Pool ' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11860' 9413' ' 11806' 9368' 11003' 11277'/11383' Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1530 520 Surface 2727' 13-3/8" 2727' 2710' 4930 2670 Intermediate 7726' 9-5/8" 7726' 6126' 6870 4760 Production Liner 4428' 7" 7423'-11851' 5956'-9405' 8160 7020 Tieback 5554' 7" 1869'-7423' 1869'-5956' 7530 4150 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11128'- 11384' 8810'-9019' 4-1/2, 12.6#x 3-1/2",9.2# N-80/L-80 11034' Packers and SSSV Type: 7"x 3-1/2"Baker SAB Packer Packers and SSSV 10960'/8671' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal ®BOP Sketch ❑ Detailed Operations Program ❑Exploratory 1:1 Stratigraphic ®Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation. December 20,2013 . ®Oil ❑WINJ ❑WDSPL ❑Plugged 16. Verbal Approval: Date ❑Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representative: ❑WAG ❑SPLUG ❑Suspended I 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: James Smith,564-5616 Printed Name: Dave Bjork Title: Engineering Team Leader Email: James.Smith7 @bp.com Signature: 7,-' Phone: 564-5683 Date: WO Commission Use Only Conditions of approval: Notify Commission so that a representative may witness Sundry Number: IS`3, S 2 ❑Plug Integrity 't/BOP Test ❑Mechanical Integrity Test ❑Location Clearance RBDMS OCT 1 6 4- Other: g 0 p 1.--t 5 }- f b 3 5 0 C7 p 5 Spacing Exception Required? ❑Yes E(No Subsequent Form Required: f c .--- 4 0 4_ ? APPROVED BY /� Approved By: JF / COMMISSIONER THE COMMISSION Date: / -1 Form 10-403 Revised 10 012 „ Submit In Duplicate q,\') Approv I i isIN fc�1l months from the date of approval V'tcot(5-) 13 V /L1► L ,,5' , • • bp Sundry Request for casing repair Well: 14-09B 0 Date: 10/02/2013 Engineer: Jimmy Smit MASP: 2470 psi Well Type: Producer Estimated Start date: December 20th, 2013 History: 14-09B was completed in April 1982 with 4-1/2 and 3-1/2"tubing. The well still has its initial completion. During prep work for a frac in 1994, the latch of the screened orifice in mandrel#9 swivelled off, leaving the valve stuck in the mandrel. A permanent patch was set over the mandrel#9 to allow for the frac to proceed. The well was a full-time producer until 2003 when it was shut-in for a series of failing TIFLs and a failing MIT-OA. An OA down-squeeze was attempted in November 2003 but failed. A second attempt was successful in restoring OA integrity and the estimated TOC is at 1,727' MD. An LDL (Dec 2004)found a leak at GLM#8. A patch was set across GLM#8 in December 2006 and after a passing TIFL in January 2007 the well was restored to full time production and has remained until August 2012. In August 2012 DHD performed diagnostics and found IA and OA pressure tracking almost instantaneous. PPPOTs on the tubing and IC were performed with the former passing and the latter failing. DHD was unable to bleed the IC void due to gas, even after torqueing the LDS to 6001b/ft. Meanwhile, Slickline swapped gas lift valves to dummies and an MIT-IA was attempted but the 2,500psi test pressure could not be reached. E-line set an IBP and performed an LDL finding a TxIA leak at GLM#6. The following MIT-T failed, but a CMIT-TxIA passed to 2,500 psi. Further leak path evaluation on the IC showed that both primary and secondary seals had failed. A Seal-Tite treatment was attempted in December 2012 to fix the wellhead. However, it was observed that the casing hanger LDS profile had grown 3/4" up and past the nose of the LDS. The actual primary seal had extruded from its race inside the casing hanger up and out into the LDS area. Meanwhile, SL set a dummy gas lift valve with extended packing in station#6. The subsequent MIT-T failed. The existence of two patches already inside the tubing, a broken latch on a DGLV inside station#7, and the pros pc pec o a mg over allo�n usiosing tF eTour lowest stations, coupled with the R. Hanger problemsled to the conclusion that a RWO would be best way forward for this well. The two most likely scenarios tor the current condition of the lower mandrel pack off are that it was either landed too high, or that the production casing was set in compression and has crept up over time. I Scope of Work: Pull 4-1/2" N-80 x 3-1/2" L-80 tapered tubing string from cut, USIT log 9-5/8" casing to determine top of cement in 9-5/8"x 13-3/8" annulus, Cut and pull 9-5/8"surface casing, Run and fully cement new 9-5/8" casing, Recover remaining tubing and mill and recover packer, Run 4-1/2"x 7" 13Cr- 80 gas lift completion. • • 1 Pre Rig Prep Work: S 1 Pull KB patch from 10,300', drift for 3-1/2" powerjet cutter F 2 CMIT-TxIAxOA to 1,500 psi E 4 Cut tubing in the middle of the first full joint above the patch in station#9 F 5 Circulate well through the cut with seawater and diesel freeze protect to 2000' MD. Post cut CMIT-TxIA to 500 psi. ✓ 6 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). PPPOT-T& IC. ✓ 7 Prep annular valves, set a BPV ✓ 8 Remove the wellhouse&flow line. Level the pad as needed for the rig. Proposed RWO Procedure: 1. MIRU Doyon 14. ND tree. NU and test BOPE with four preventers configured top down (annular, 9- 5/8" fixed, blind shears, mud cross' and 3-1/2"x 6"VBR's). Test the VBR's and annular to 3,500 psi. 2. Pull and lay down 4-1/2"x 3-1/2"tapered tubing string to the jet cut. ��sg 3. RU E-line. Run USIT in the 9-5/8" casing to determine TOC in the 9-5/8"x 13-3/8" annulus. 4. Set 9-5/8" RBP at—1800' (100' below the planned cut depth) and dump 50' of sand on top. 5. Cut and pull 9-5/8" casing from cut @—1,700' (1st full joint above logged TOC). 6. Run 13-3/8" scraper and dress 9-5/8"casing stub. 7. Run and cement 9-5/8"tie-back casing to surface with 100 bbls of 15.8 ppg class G cement. 8. Drill out float equipment and test casing to 3,500 psi. Pull 9-5/8" RBP and test wellbore to 3,500 psi. 9. Mill and retrieve packer from10,960'. 10. Scrape 7" casing. 11. Run new 4-1/2" 13Cr gas lift completion with 7" x 4-1/2" HES TNT packer. MIT-T& MIT-IA to 3500 psi. 12. Set a BPV and RDMO. Post rig Work 1 ✓ 1 Pull BPV 1 S 2 Pull ball and Rod, Pull RHC seat, Run GL Design O 3 Hook up flowline and AL lines, set wellhouse, etc. and POP well "TREE= GRAY • • 1NELLHEAD= GRAY', 1 4-0 9 B SAFETY NOTES: ACTUATOR= BAKER C' OKB.ELEV= 71'1 I i 1869' -19-5/8"X 7"BKR LNR HGR BF.ELEV= w/TEBKSLV,D=? KOP= 2300' 20"CONDUCTOR H 80' I ■ v. I 2186' —{4-1/2"CAM BAL-O SSSV NP,D=3.813" I Max Angle= 56°@ 7100' 94#,11-40, 1 ( I Datum MD= 11203', D=19.124" O 2204' —14-1/2"X 3-1/2"XO,D=2.992" Datum TVD= 8800'SS'' TOP OF 7"TIEBK LNR H 1869' ►� i GAS LIFT MANDRELS �� i STI MD TVD DEV TYPE VLV LATCH FORT DATE 4-1/2"TBG-PC,12.6#,N-80,.0152 bpf,ID=3.958" H 2204' ♦ ' 1 2643 2631 19 TE DMY BK 0 09/09/12 113-3/8"CSG,72#,L-80 BUTT,D=12.347" —I 2727' A' L ' 2 5145 4497 48 TE DMY BK 0 09/09/12 ► 3 6774 5582 51 TE DMY BK 0 08/22/03 ►� • 4 7647 6081 56 TE DMY BK 0 09/09/12 Minimum ID = 1.825" @ 10300' ►; • 5 8408 6586 45 TE DMY BK 0 04/17/82 3-1/2" BKR KB PATCH ►; 6 9074 7086 38 TE ****DMY BK 0 01/24/13 ►� • 7 9703 7585 36 TE *DMY BK 0 07/10/92 ►� • • 8 10326 8112 27 TE **DMY BK 0 05/26/05 7"TEBACK LNR,29#,S0095 BTRS, —1 7423' j 9 10892 8613 31 TE ***SO 20 09/14/93 .0371 bpf,D=6.184" ,•j ****GLM#6=DMY HAS EXTENDED PACKING .1 ■ *GLM#7=DMY HAS BROKEN LATCH TOP OF 7"LNR H 7423' **GLM#8=DMY HAS EXTENDED PACKING(BE11ND PATCH) ***GLM#9=LATCH PULLED(1/24/94)&BE-114)PATCH 7423' H 9-5/8"X 7"TRACK LNR,D=? 19-5/8"CSG,47#,L-80 BTC,D=8.681" —1 —7726 I''''''''' MILOUT WINDOW(14-09B) 7726'-7741' 10300' -10330' —13-1/2"BKR KB PATCH,D=1.825"(12/22/06) 1 10873'-10898' H3-1/2"IVERLA PATCH,D=2.375"(4/23/94) I 10930' —13-1/2"BKRSBRASSY,D=? 3-1/2"TBG-PC,9.2#,L-80,.00870 bpf,ID=2.992" —1 11034' 10960' —i 7"X 3-1/2"BKR SAB PKR D=? 11002' —13-1/2"CAMCO DB-6 NP,D=2.75" PERFORATION SUMMARY RE=LOG:BHCS ON 04/10/82 I 11003' I—I3-1/2"BKR IBP(09/12/12) I ANGLE AT TOP PERF:35°@ 11128' 11033' H3-1/2"BKRSHEAROUTSUB Note:Refer to Production DB for historical pert data SIZE SFF INTERVAL Opn/Sqz SHOT SQZ —1 11034' I—I3-1/2"WLEG,D=3.992"I 2-5/8" 4 11128-11148 0 06/05/92 11025' H EIA)TT LOGGED 04/22/82 2-5/8" 4 11168-11190 0 06/05/92 2-5/8" 4 11200-11210 0 06/05/92 2-1/2" 4 11240-11274 0 06/21/86 2-1/2" 4 11240-11274 0/R 08/21/91 2-1/2" 4 11286-11306 0 08/21/91 2-5/8" 4 11286-11306 S 12/26/82 07/18/85 2-5/8" 4 11312-11349 S 12/26/82 07/18/85 2-1/8" 4 11373-11384 0 06/21/86 11277' —FISH-35'SWS TS 1-3/8"EN;1-11/16"OD; 2 BOW SPRING TYPE CENTRALIZER(12/08/94) 'i, 0 I 11383' H FISH-PERF GUN STRP 06/22/86) I PBTD --j 11806' i—At•ttrtt •••••••,,,* 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" H 11851' A A A A A A A DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 04/18/82 PKR 191 ORIGINAL COMPLETION 09/11/12 WEC/JMD GLV GO(09/09/12) WELL: 14-0913 12/22/06 TEJPAG SET BKR KB PATCH 09/14/12 RWANJMD SET BKR 13P(09/12/12) PERMIT No:"1820340 02/10/07 CJNIPAG GLV GO 12/31/12 PJC GLV#7 CORRECTION AR No: 50-029-20534-02 02/04/10 JLW/PJC TBG&LNR CORRECTIONS 01/29/13 AMNJMD GLV C/O(01/24/13) SEC 9,T10N,R14E,1991'FNL&897'FEL 04/25/10 JO/PJC TREE C/0 10/03/13 JS/JMD CORRECTION TO 7"LNR DEPTWPBTD 08/12/12 PJC CONVERSION CORRECTIONS I I BP Exploration(Alaska) " TREE= GRAY • - 1NELLHEAD= GRAY 14-O V B V SAFETY NOTES: ACTUATOR= BAKER C Proposed RWO OKB.ELEV= 71' BF.ELEV= .,--"----- •® !t KOP= 2300', 20"CONDUCTOR - 80' S Max Angle= 56°@ 7100' 94#,H-40, 7`' Datum MD= 11203' D=19.124" a / `M\- Datum N D= 8800'SS ' t 3 3`cb [975/8" HES ES Cementer I — I ,� / •a/� 9-5/8" BKR ECP — I ♦" 9-5/8" Bowen Casing Patch — I 1869' 1-19-5/8"X 7"BKR LNR HGR w/TIEBK SLV,ID=? 19-5/8"47#,L-80,Hydri1563 — 1 • .' 2000' L IP 4-112"X N ,D= ►♦ • 3.813"■ ♦ .♦ ITOP OF 7"TIEBK LNR — 1869' ►♦ .♦ ►� �� ST MD ND DEV TYPE VLV LATCH FORT DATE :44 6 KBG2 DCR 13-3/8"CSG,72#,L-80 BUTT,ID=12.347" —I 272T • ! . 5 KBG-2 DMY ■. ••• 4 KBG2 DMY ∎. 3 KBG2 DMY , 4, 2 KBG2 DMY 4-1/2" 12.6 ppf 13Cr VamTop Tubing ►� �� 1 10808 KBG2 DMY � i• V ♦. 7"TIEBACK LNR,29#,S0095 BTRS, — 7423' V '4• .0371 bpf,ID=6.184" j� �� A 'A 7423' —19-5/8"X 7"TIEBACK LNR,ID=? 11 0 TOP OF 7"LNR 7423' MLLOUT WINDOW(14-09B) 7726'-7741' r4-1/2"9-5/8"CSG,47#,L-80 BTC,D=8.681" — —7726 / ' 10888' 3.813"X NP,D= $ ►T,I 10,920' HES 7"x 4-1/2"TNT PKR. 1D=3.833 I 10954' 4-1/2"X NIP,ID= 3.813" PERFORATION SUMMARY REF LOG:BHCS ON 04/10/82 I 11025' 4-1/2"XN NIP,ID ANGLE AT TOP FERF:35°@ 11128' Note:Refer to Roduction DB for historical perf data 11043' 1—4-1/2"WLEG SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-5/8" 4 11128-11148 0 06/05/92 I 2-5/8" 4 11168-11190 0 06/05/92 2-5/8" 4 11200-11210 0 06/05/92 I 2-1/2" 4 11240-11274 0 06/21/86 I 2-1/2" 4 11240-11274 0/R 08/21/91 2-1/2" 4 11286-11306 0 08/21/91 2-5/8" 4 11286-11306 S 12/26/82 07/18/85 2-5/8" 4 11312-11349 S 12/26/82 07/18/85 2-1/8" 4 11373-11384 0 06/21/86 , 11277' FISH-35'SWS TS 1-3/8"FN;1-11/16"OD; 2 BOW SPRNG TYPE CENTRALIZER(12/08/94) 4111T 11383' H FISH-PERF GUN STRIP 06/22/86) PBTD — 11806' ••••••• 7"LNR,29#,L-80 BTRS,.0371 bpf,ID=6.184" H 11851' 1;1;1;yameh1;1; DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/18182 PKR 191 ORIGINAL COMPLETION 09/11/12 WEC/JMD GLV C/O(09/09/12) WELL: 14-09B 12/22/06 TEL/PAG SET BKR KB PATCH 09/14/12 RWIWJMD SET BKR 13P(09/12/12) PERMIT No:'1820340 02/10/07 CJN/PAG GLV C/O 12/31/12 PJC GLV#7 CORRECTION API No: 50-029-20534-02 02/04/10 JLW/PJC TBG&LNR CORRECTIONS 01/29/13 AM/JMD GLV C/O(01/24/13) SEC 9,T1ON,R14E, 1991'FNL&897'FEL 04/25/10 JO/PJC TREE C/O 10/03/13 JS/JMD CORRECTION TO 7"LNR/PBTD 08/12/12 PJC CONVERSION CORRECTIONS BP Exploration(Alaska) • • 0 - 3 II U• Y U J [�• _ < 1-F w K 0. O _ nog C9 NV bLL ao g� o a a p� ma Z N d S W K Cr w O � J N W Q d W 4 y Op m • >> J O Z D_ Z m Y V m m F- a _ .Q tp¢ �y m L^ - N M N tO r el _ •� C E a �Z 01 V. t I ! WEI ZO g i l i c\ O , NE w `6 N © _ - Zo =2gR : j6 ,....._ _>- .� N N ]? Z�- II / ,2O / m © D vi q\ a y m co Z ED I 1x, - `I✓I e JO_ H d� Z F it§ n Q Om u g - _ s g a sa fig./ r as < 1 i iii .." ii ------b- tr, i e 0 III III 0 LA i u I I. I al II i f • P-c i4o7c Regg, James B (DOA) P7 I8z054o From: AK, D &C Well Integrity Coordinator [AKDCWeIllntegrityCoordinator @bp.com] Sent: Friday, September 14, 2012 7:44 AM To: Schwartz, Guy L (DOA); Regg, James B (DOA); AK, OPS FS3 OSM; AK, OPS FS3 DS Ops Lead; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Stechauner, Bernhard Cc: AK, D &C DHD Well Integrity Engineer; Walker, Greg (D &C) Subject: NOT OPERABLE: 14 -09B (PTD #1820340) Tubing Leak Found and IAxOA unmanageable All, Producer 14 -09B (PTD #1820340) has been secured with a down hole plug and passed a CMIT -TxIA. A LDL was performed and a tubing leak found at 9074' (GLM #6). Also, while diagnosing TxIA communication, the IAxOA was found to be unmanageable. A PPPOT -IC failed, indicating possible communication through the welll air. seals. The well is reclassified as Not Operable at this time until integrity is restored. Plan forward: 1. APE: Evaluate tubing repair SCANNED Nr�a�� ED UM 0 7 2U1� 2. WIE: Evaluate for Seal -Tite IC hanger repair Thank you, Mehreen Vazir BPXA Well Integrity Coordinator From: AK, D &C Well Integrity Coordinator Sent: Sunday, August 26, 2012 7:20 PM To: 'Schwartz, Guy L (DOA)'; 'Regg, James B (DOA)'; AK, OPS FS3 OSM; AK •PS FS3 DS Ops Lead; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead ismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC •C TL; G GPB FS3 Drillsites; Stechauner, Bernhard Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Cline gsmith, Mike J Subject: UNDER EVALUATION: 14 -09B (PTD #1820340) Susta * ed IA Casing Pressure Above MOASP All, Producer 14 -09B (PTD #1820340) has confirmed sust ned IA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to 2060/2060/710 on 8/25/ 412. A TIFL failed on 08/26/2012. The well has been reclassified as Under Evaluation. The well may remain online whi - work is conducted to attempt to restore integrity. Plan Forward: 1. DHD: Re -TIFL with a warm well 2. WIE: Pending TIFL results, ev- ate for gas lift valve change out. A TIO plot and wellbore schematic have been included for reference. 1 P64 l4 -03 Regg, James B (DOA) Prb i8z o ' From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Sent: Wednesday, To: Regg, James (DOA)er 05, 2012 12:59 PM 7 ?1 ll6 Cc: Vazir, Mehreen; AK, D &C Well Integrity Coordinator Subject: FW: UNDER EVALUATION: 14 -09B (PTD #1820340) Sustained IA Casing Pressure Above MOASP Attachments: Producer 14 -09B (PTD #1820340) TIO Plot.docx; Producer 14 -09B (PTD #1820340) wellbore schematic.pdf Mr. Regg, While performing diagnostics on Producer 14 -09B (PTD #1820340) for TxIA communication, the OA exhibited sustained casing pressure above MOASP. The wellhead pressures were T /IA /OA equal to 1968/1075/1200 on 08/31/2012. This well is still classified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan Forward: 1. DHD: Bleed IA & OA Pressures scANNED 9 7 203 OA - scl' f � ` 1ztk7WSi 2. Wellhead: PPPOT -T & IC ,t-4 h3r5: 3. Operations: Bring Well Online p_ Z2.5 ✓ 4. DHD: Re - TIFL & OART with a warm well Please call if you have any questions or concerns. Thank You, Shane Wills (Alt. Greg Walker) Alaska Drilling Wells Well Integrity Engineer 907.659.5525 907.350.8258 rD mailto :AKD &CDHDWe1IIntegri(&,bp.com From: AK, D &C Well Integrity Coordinator Sent: Sunday, August 26, 2012 7:20 PM To: 'Schwartz, Guy L (DOA)'; 'Regg, James B (DOA)'; AK, OPS FS3 OS • , OPS FS3 DS Ops Lead; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Tea ead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OP 'CC EOC TL; G GPB FS3 Drillsites; Stechauner, Bernhard Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D.- ); Clingingsmith, Mike J Subject: UNDER EVALUATION: 14 -09B (PTD #1820 • Sustained IA Casing Pressure Above MOASP 1 • PBU 14 -09B PTD #1820340 9/5/2012 TIO Pressures Plot Will:14011A 3.x0 - — el— Tee - IA 2,000 - — A-- OA 00A - O00A On .x0 - • 05'2612 • 0502'12 06134112 051612 4623112 0633112 .'12 071412 072N12 0712512 09 +0412 08/11/12 06118/12 03125'12 TREE= GRAY • WELLFEAD GRAY SA NOTES: ACTUATOR = BAKE C - KB. ELEV = 71' 1869' I— 9-5/8" X 7' BKR LNR HGR BF .ELEV - 2300 20 80' I w /TI IKSLV, =? KOP " CONDUCTOR --I ' ' - Max Angle = 56" @ 7100' 94#, H-40, * 0 IIIIP .� 2186' - I4 -1/2" CAM BAL-O SSSV NP, ID 3.813" bat urn MD= 11203 L)=19.124 ' 04 , Datum TVD = 8800' SS = 2204' �4 112" X 3 -1l2" XO D = 2.992" TOP OF T T1E$K LNR I 1869' ► • I4 -1/2" TBG-FC, 12.6#, N-80, .0152 bpi, D = 3.958" 2204' 0 + GAS UFT MANDRELS ►' �� ST MD TV D DEV TY FE VLV LATCH FORT DATE 113 -3/8" CSG, 72#, L -80 BUTT, D= 12.347" 2727' ►� 'N 1 2643 2631 19 TE DOME BK 16 02/10/07 • ►i [ 2 5145 4497 48 TE DOME BK 16 02/10/07 . 3 6774 5582 51 TE DMY BK 0 08/22/03 Minimum ID = 1.825" @ 10300' ►� • ,4 A � 4 7647 6081 56 TE DOME BK 16 02/10/07 3-1/2" BKR KB PATCH ►: ' : 5 8408 6586 45 TE DMY BK 0 04/17/82 • • . 6 9074 7086 38 TE SO BK 20 02/10/07 * • 7 9703 7585 36 TE 'DMY BK 0 07/01/92 7' TIEBACK LNR, 29#, S0095 BTRS, — 7423' ► : 8 10326 8112 27 TE **DMY BK 0 05/26/05 .0371 bpf, ID= 6.184" �r 9 10892 8613 31 TE "'SO 20 09/14/93 t 40 'GLM #7 DMY HAS BROKEN LATCH TOP OF 7' LNR — 7423' '*GLM #8 = DMY HAS EXTENDED PACKING (BEND PATCH) •'•GLM #9 = LATCH FULLED (1/24/94) & BE) I) PATCH I 7423' — 9 -5/8' X 7' TEZ3ACK LNR, D = ? 9 -5/8' CSG, 47 #, L -80 BTC , D = 8.681" H — 7726 NIL LOUT WINDOW ( 14 -09B) 7726' - 7741' 10300' - 10330' IH3 -1!2' BKR KB PATCH, D = 1.825" (12/22/06) I 10873' - 10898' — 3 -1/2' MERLA PATCH, D = 2.375' (4123/94) I i 10930' H3- 1 /2 " BKR SBRASSY, =? 3-1/2" TBG -PC, 9.2#, L -80, .00870 bpi D = 2.992" 11034' . 10960' — X 3-1/2' BKR SAB FI(R E)= ? C3 CA 11002' 3 -1/2" CAMCO DB-6 NP, ID= 2.75' PERFORATION SUMMARY REF LOG BRCS ON 04/10/82 ANGLE AT TOP FERE: 35° @ 11128' I 11033' — 3-1/2" BKR SHFAROUT SUB Note: Refer to Production DB for historical pert data SIZE SFF INTERVAL Opn /Sqz SHOT SQZ 11034' —{ 3 1l2" 1NLEG, tD = 3.992" 2 -5/8" 4 11128 - 11148 0 06/05/92 11025' -- I EL MO TT LOGGED 04/22/82 2 -5/8" 4 11168 - 11190 0 06/05/92 2 -5/8" 4 11200 - 11210 0 06/05/92 I 2 -1/2" 4 11240- 11274 0 06/21/86 2 -1/2" 4 11240 - 11274 0/R 08/21/91 I 2 -1/2" 4 11286 - 11306 0 08/21/91 2 -518" 4 11286 - 11306 S 12/26/82 07/18/85 I 2 -5/8" 4 11312 - 11349 S 12/26/82 07/18/85 2 -1/8" 4 11373 - 11384 0 06/21/86 11277' — FISH - 35' SWS TS 1 -3/8" FN 1- 11/16" OD; 2 BOW SPRING TY PE CENTRALIZER (12/08/94) I 11383' — FISH - PERE GUN STRIP 06/22/86) 7'" LNR, 29#, L -80 BTRS, .0371 bpf, ID = 6.184" — 1 11851' qR TD 11860' ALMA t DATE REV BY COMMENTS DATE REV BY COMMENTS FRI:H©E BAY UNIT 04/18/82 PKR191 ORIGINAL COMPLETION WELL: 14-095 12/22/06 TEIJPAG SET BKR KB PATCH PERMT No. 1820340 02/10 /07 CJN./PAG GLV 00 AF3 No: 50- 029 - 20534 -02 02/04/10 JLW /PJC TBG & LNR CORRECTIONS SEC 9, T1 ON, R14E, 457.26' FEL & 2390.15' FN. 04/25/10 JO/PJC , TREE C1O 1 I 08/12/12 PJC CONVERSION CORRECTIONS BP Exploration (Alaska) I ill Pg tit /4 -6gs Arb 18zo Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator[ AKDCWellIntegrityCoordinator @bp.com] —l� A/Zrz/v Sent: Sunday, August 26, 2012 7:20 PM — 1 To: Schwartz, Guy L (DOA); Regg, James B (DOA); AK, OPS FS3 OSM; AK, OPS FS3 DS Ops Lead; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC EOC TL; G GPB FS3 Drillsites; Stechauner, Bernhard Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Clingingsmith, Mike J Subject: UNDER EVALUATION: 14 -09B (PTD #1820340) Sustained IA Casing Pressure Above MOASP Attachments: Producer 14 -09B (PTD #1820340) TIO Plot.docx; Producer 14 -09B (PTD #1820340) wellbore schematic.pdf All, ✓' Producer 14 -09B (PTD #1820340) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to 2060/2060/710 on 8/25/201277TIFL failed on 08/26/2012. The well has been reclassified as Under Evaluation. The well may remain online while work is conducted to attempt to restore integrity. Plan Forward: 1. DHD: Re -TIFL with a warm well 2. WIE: Pending TIFL results, evaluate for gas lift valve change out. — A TIO plot and wellbore schematic have been included for reference. «Producer 14 -09B (PTD #1820340) TIO Plot.docx» «Producer 14 -09B (PTD #1820340) wellbore schematic.pdf» Please call if you have any questions or concerns. Thank you, Gerald Murphy (alt. Mehreen Vazir) SCANNED h4AY 0 2 2013 Well Integrity Coordinator SCE'- zoeo Office (907) 659 -5102 r 1 27/ 60 Cell (907) 752 -0755 jf z Email: AKDCWeIIIntegritvCoordinator (a�BP.com 104,ce cu-4 o {c- 1 t PBU 14 -09B PTD #1820340 8/26/2012 TIO Pressures Plot 1 Well: 74044 1 ! 4.000 1 1 • I 3.000 - 1 + T --1111— IA 2.000 - -41- OA 1 OOA 1 — 4 -- 000A 0n 1 1.000 . i 1 r 1 I ,_...-•—•• • r r ~yam • 1 1 25'2 6:12 0&2L12 36/09112 0 &'16'12 0623112 06130/12 07107112 07114112 07.121112 072& /12 00104/12 03111112 03;412 0 2,25x12 1 TTY GRAY I GRAY 14 -49 B SA NOTES: ACTUATOR = BA KER C KB. — a - E V = 71' I 1869' I— 9-5/8' X 7" BKR LNR HGR BF.BEV_ w /TEBKSLV,D =? KOP = 2300' 20" C O DUCTOR, H 80' I I 2186' 4-112" CAM BALD SSSV NP, D- 3.813' Max Angle = 56 C+ 7100 94#, H�10, ® ••� 1 I� * s 4, Datum MO = 11203' D = 19.124' go . Datum 1VD = 8800 SS TOP OF 7" T1EBK L NR 1869' 2204' 1— 4-1/2" X 3-1/2" XO, D = 2.992" . • . 14-12' TBG-PC, 12.6#, N-80, .0152 bpf, D = 3,956" I-L 2204' • �, GAS LFT M4NDR1IS 4 ST A) I TVD DEV TYPE VLV LATCH FORT DATE TT D J � 13 -3/8" CSG, 72#, L -80 BU, = 12.34T I I 2727' • 4 � 1 2643 2631 19 TE DOME BK 16 02/10/07 •. 2 5145 4497 48 TE DOME BK 16 02/10/07 • DIM' BK 6774 558? 51 TE D BK 0 08/22/03 Minimum ID = 1.$25 1030' �. 4 7647 6081 56 TE 1301 BK 16 02110 /07 ► o 5 8408 45 TE OW BK 0 04/17/82 3 112 BKR KB PATCH ,� ., r• i', 6 9074 71 38 TE SO BK 20 02/10/07 • A P4 7 9703 7585 36 TE 'DMY BK 0 07/01/92 7' TIEBACK LM 29#, S0095 BTRS, —I 7423' r* St 8 10326 8112 27 TE "DMY BK 0 05/26/05 .0371 bpi, D = 6.180' f� 9 10892 ' 31 TE "`SO 20 09/14/93 i� H._ A41' GLM = D HAS BROKEN LATCH TOP OFT LNR I L 7423' I "GLM #8 = DAY HAS EXTETDED PACICNG (BB-IND PATCH) ""GLM #9 = LATCH EUCLID (1/24/94) & BRIM) PATCH I 7423' I- -19-5/8" X T TIEBACK LNR D= 7 1 9-5/8" CSG, 47 #, L -80 BTC , 13 = 8.681' --I —7T'26 r M_LOUTNib ( 14 -09B) 7726' - 7741' 1. 10300' - 1 0330' H3-1/2 BKR KB PATCH, D = t825" (12/22/06) 1 10873' - 10898' 3 -1/2' MERLA PATCH, D = 2.375" (4/23194) I 10930' H3- 12 "BKRSBRASSY, D =? 3-1/2' TBG PC. 9.24, L-80, .00870 bpf, ID= 2x992" H 11034' . 10960' —17- X 3-1/2" BKR SAB RSR D =? I PERFORATION SUMdA RI' I I I 11002' H 3-12" CA MCO D6-6 PP, D = 2.75" REF LOG: BRCS ON 04/10/82 tion DB for historical pert data \ 11033' 1-13-1/2" BKR SFfAfRC)11T SUB Note: Refer to Production ANGLE AT TOP PE2F: 35° 11128' SIZE SFF RNTERI/AL Opn/Sgz SHDT SQZ 11034' H 3-12" WLEG, D = 3.992" 2 -5/8' 4 11128 - 11148 0 06/05/92 I 11025' IHB.MD TT LOGGED 04/22/82 I 2 -5/8" 4 11168 - 11190 0 06/05/92 2-5/8" 4 11200 - 11210 0 06/05/92 2 -12" 4 11240 - 11274 0 06/21/86 2 -12" 4 11240- 11274 0/R 08/21/91 2-1/2' 4 11286 - 11306 0 08/21/91 2 -5/8' 4 11286 - 11306 S 12/26/82 07/18/85 2-5/8' 4 11312 - 11349 S 12/26182 07/18/85 2 -1/8" 4 11373 - 11384 0 06/21/r it I 1127T I— FISH- 35' SWS TS 1 -3/8" FN; 1- 11/16' OD; 2 BOW SPRNG TYPE CENTRALIZER (12/08/94) 11383' FISH - PERF GUN STRP 0622/ +w) 1 7' LNR 2'i L-80 BTRS, .0371 bpf, D = 6.184' I 11861' 494144 ` 441 LNr- .t 60r,; TD 11860' 44N4 •4i+i'a'- **I DATE REV BY COM E NTS '' DATE REV BY COMMENTS PRIAFIDE BAY UNIT 04/18/82 PKR 191 ORIGINAL COMPLETION \MR I : 14-09B 12/22/06 TEUPAG SET BKR KB PATCH PBRMT No: `1820340 02/10/07 CJN/PAG GLV C/0 AR No: 50- 029 - 20534 -02 02/04/10 JLW/PJC TBG & LFR CORRECTIONS CTIONS SEC 9, T1ON, R14E, 457,26' Fa & 2390.15' FTL 04/25/10 JO/PJC TTY CIO 08/12/12 PJC CONVERSION • Exploration (Alaska) 1 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 • Dec 07, 2009 "~~. Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 ~ ~ ~ ~ ~ ~~ ~~ ~ ~~"..;,:~~s~~ Subject: Corrosion Inhibitor Treatments of GPB DS 14 ~. ~ ~~ ~3~ Dear Mr. Maunder, ~ 1 r _ d Gj~ Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 14 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-14 Date: 12/05/09 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 14-01A 1931850 500292031701 Sealed Conductor NA NA 14-02C 2071150 500292031803 Sealed Conductor NA NA 14-03A 1961290 500292031901 Sealed Conductor NA NA 14-04A 1961640 500292032001 Sealed Conductor NA NA 14-OSA 1920010 500292032701 Sealed Conductor NA NA 14-06A 2040360 500292032801 Sealed Conductor NA NA 14-07 1780660 500292032900 Sealed Conductor NA NA 14-08A 2022100 500292033001 Sealed Conductor NA NA 14-O9B 1820340 500292053402 Sealed Conductor NA NA 14-10 1801300 500292052800 Sealed Conductor NA NA 14-11A 2051260 500292052901 Sealed Conductor NA NA 14-12 1811090 500292063100 Sealed Conductor NA NA 14-13 1811010 500292062400 Sealed Conductor NA NA 14-t4 1811020 500292062500 Sealed Conductor NA NA 14-15 1810840 500292061100 Sealed Conductor NA NA 14-16A 1971670 500292060801 Sealed Conductor NA NA 14-17A 2030010 500292056201 Sealed Conductor NA NA 14-186 2071290 500292055102 Sealed Conductor NA NA 14-19 1810450 500292057800 Sealed Conductor NA NA 14-20 1810700 500292059800 Sealed Conductor NA NA 14-21A 2051070 500292075601 Sealed Conductor NA NA 14-22A 1921230 500292074701 Sealed Conductor NA NA 14-23A 2090200 500292075701 NA 4 NA 25.50 10/20/2009 14-24 1830910 500292097000 NA 0.6 NA 3.40 10/20/2009 14-25 1831020 500292098100 NA 2.1 NA 15.30 11/16/2009 14-26 1811100 500292063200 Sealed Conductor NA NA 14-27 1831700 500292104600 NA 3 NA 17.00 10/25/2009 14-28 1820120 500292070800 Sealed Conductor NA NA 14-29 1811680 500292068000 Sealed Conductor NA NA 14-30 2050940 500292067901 Sealed Conductor NA NA 14-31 1831110 500292098900 Sealed Conductor NA NA 14-32 1831220 500292099900 NA 0.6 NA 3.40 10/19/2009 14-33 1831250 500292100200 Sealed Conductor NA NA 14-34 1831330 500292101000 NA 7.3 NA 47.60 10/20/2009 14-35 1831420 500292101800 Sealed Conductor NA NA 14-36 1831630 500292103900 NA 0.7 NA 3.40 10/20/2009 14-37 1880490 500292181000 NA 1.3 NA 5.10 10/20!2009 14-38 1881030 500292186200 NA 0.8 NA 3.40 10/24/2009 14-40A 2011350 500292187501 Sealed Conductor NA NA 14-41 1920960 500292229000 NA 0.8 NA 6.80 10/18/2009 14-43 1921080 500292229600 NA 1.4 NA 10.20 10/23/2009 14-44A 2021930 500292257301 NA 10 NA 88.40 11/24/2009 05/30/08 ~~r~~~Wrr~~l- Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth well .L,M ~ +~A~ ~VlY ~ .t ~ItU{/ i ,... ne ...:.. NO.4727 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Z-03 11975773 SFRT i- - _ _ - ( 05/20/08 1 P2-32 12066522 MEM TEM SURVEY - 05/19/08 1 18-13B 12021159 MEM PROD PROFILE '~- ~ ~ 05/18/08 1 1 Z-03 11975773 USIT - ~ C~~ 05/19/08 1 1 W-29 11999017 INJECTION PROFILE ( 05/26/08 1 1 15-39A 11999018 PRODUCTION PROFILE - 05!28/08 1 1 07-30A 11963095 SCMT - 05/27/08 1 1 14-098 11982432 PROD PROFILE W/FSI - 0 05/27/08 1 1 A-34A 12057614 USIT -(p ' /(pGfd~- 05/26/08 1 1 GNI-04 11824353 OH LDWG EDIT (DSI) l) _I I ~, 11/07/07 1 1 a BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2.1 900 E. Benson Blvd. - Anchorage, Alaska 99508 Date Delivered: ~;:; Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2 38 j / ATTN: Beth /',- Received by: • Ml,~ . STATE OF ALASKA . _ ~.o RECE\VED ALA OIL AND GAS CONSERVATION COM~IONII i,. REPORT OF SUNDRY WELL OPERATIONS JAN 0 4 2007 D StimulateD .. O~her~ 1~1.~;r~ D WaiverD T~~Qi~ S D Re-enter Suspended Well chorage 5. Permit to Drill Number: 182-0340 j Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure o 0 0 o 0 0 15. Well Class after proposed work: Exploratory Development W 16. Well Status after proposed work: Oil W Gas WAG 1. Operations Abandon D Repair Well [2] Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development W Stratigraphic P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 71 KB 8. Property Designation: ADLO-028314 11. Present Well Condition Summary: Total Depth measured 11860 feet true vertical 9412.64 feet Effective Depth measured 10973 feet true vertical 8682 feet Casing Length Size MD Conductor 90' 20" 91.5# H-40 28' - 118' Liner 5561' 7" 23# SOO-95 1869' - 7430' Liner 4428' 7" 29# L -80 7423' 11851 ' Production 7700' 9-5/8" 47# L-80 26' 7726' Surface 2700' 13-3/8" 72# L-80 27' 2727' Perforation depth: Measured depth: 11286 - 11306 True Vertical depth: 8938.79 - 8955.11 11312 - 11349 8960.01 - 8990.29 Tubing: (size, grade, and measured depth) 5-1/2" 15.5# 3-1/2" 9.3# 4-1/2" 12.6# 3-1/2" Baker SAB Packer o o Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations X Oil-Bbl shut in shut in 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble Exploratory Service 6. API Number: ¡ 50-029-20534-02-00 9. Well Name and Number: PBU 14-09B j 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Plugs (measured) 10973 Junk (measured) None TVD Burst Collapse 28' - 118' 1490 470 1869' - 5959.98' 7530 4150 5956' - 9405' 8160 7020 26' - 6126' 6870 4760 27' - 2710' 4930 2670 - SCANNED JAN 11 2007 L-80 L-80 N-80 24' - 30' 2205' - 11034' 30' - 2205' 10960 o o Tubing pressure o o Service WINJ WDSPL Title Data Engineer ¡?nn1 Å }j LUU¡ Signature . Phone 564-4944 Date 1/3/2007 Form 10-404 Revised 04/2004 v: µq \10 ~..-\. Submit Original Only . . 14-09B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 12/20/2006 T /1/0= 220/550/0 Assist Slick Line w/ Brush-N-Flush (TBG Patch) Pumped 111 bbls of 190* crude down tubing while sllick line brushes. Final WHP's = 700/800/250 12/20/2006 ***WELL SHUT IN ON ARRIVAL***(pre patch) BRUSH/FLUSH TUBING TO MERLA PATCH @ 10873' MD. DRIFTED W/ 3.5" BAIT SUB, 2.5" DMY GUN, 2.73" CENT, 2.5" DMY GUN, 2.74" CENT TO 10500' SLM-NO RESTRICTIONS (30' 6" over all length). 1 ***WELL *** 3.5" BAKER ONE RUN PATCH ACROSS GLM #8 AT 10,326' (TUBING DEPTH). PATCH WAS SET OVER INTERVAL 10300 - 10330' (E-LlNE) DEPTH. COMPLETED. WELL OVER TO DSO*** FLUIDS PUMPED BBLS I 1 DIESEL 1 TOTAL Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job# 10928608 10715445 10964105 10830819 10928610 10670030 ('i'5t?3 D-11A :203--oZODS 07 -30A I~..() jl{ OS 14-098 Fr5 "/~'],. P2-56 ~I) t.{..2t5 OS 11-06A !'f1-M E-21A Log Description MEM PROD/lNJECTION PROFILE MEM PROF & IPROF LEAK DETECTION RST MCNL (PRINT ONLY-NO CD) MCNL (PRINT ONLY-NO CD) Date 12/16/04 12/09/04 12/23/04 06/20/04 12/24/04 08/22/04 Blueline 1 1 1 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 -I. ~ ::~:E::~:~:::~~:d·99508a ~ SCANNED þ,PR 1 5 2005 01/18/05 NO. 3307 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints CD ---" .~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 991;03-28 A TTN: Beth ~ t Received by: /, rr¡~ " "f? (STATE OF ALASKA(C ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbandonD SuspendD Operation ShutdownD Perforate 0 WaiverD OtherD Alter CasingD Repair WellŒ1 Plug PerforationsŒ] Stimulate D Time ExtensionO Change Approved ProgramD Pull TubingD Perforate New Pool 0 Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 182-0340 Development Œ] Exploratory 0 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic 0 ServiceD 50-029-20534-02-00 7. KB Elevation (ft): 9. Well Name and Number: 71.00 14-09B 8. Property Designation: 10. Field/Pool(s): ADL-0028314 Prudhoe Bay Field 1 Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 11860 feet true vertical 9412.6 feet Plugs (measured) 10973' Effective Depth measured 10973 feet Junk (measured) None true vertical 8681.9 feet Casing Length Size MD TVD Burst Collapse Conductor 90 20" 91.5# H-40 28 - 118 28.0 - 118.0 1490 470 Liner 5561 7" 23# SOO-95 1869 - 7430 1869.0 - 5960.0 7530 4150 Liner 4428 7" 29# L-80 7423 - 11851 5956.1 - 9405.2 8160 7020 Production 7700 9-5/8" 47# L-80 26 - 7726 26.0 - 6125.9 6870 4760 Surface 2700 13-3/8" 72# L-80 27 - 2727 27.0 - 2709.5 4930 2670 Perforation decth: R E eEl VE 0, Measured depth: . . . True vertical depth: JAN 2 8 2004 Tubing (size, grade, and measured depth): 5-1/2" 15.5# L-80 @ 24 - 30 Alaska Oil & Gas Cons, Commission 4-1/2" 12.6# N-80 @ 30 - 2205 Anchorage 3-1/2" 9.3# L-80 @ 2205 - 11034 3-1/2" Merla Permanent Tubing Patch @ 11873 - 11896 Packers & SSSV (type & measured depth): 3-1/2" Baker SAB Packer @ 10960 12. Stimulation or cement squeeze summary: . .',' ~,nn, Intervals treated (measured): ¡oanuA. BfL fEB 0 ~~.uU Treatment descriptions including volumes used and final pressure: ~ 13 ReDresentative Dailv Averaae Production or Iniection Data Oil-Bbl I Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 162 I 0.73 1409 250 217 Subsequent to operation: Well Shut-In 360 420 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒJ GasD WAG 0 GINJD WINJD WDSPLD Daily Report of Well Operations. ~ Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: ~~ct NM Printed Name '"", "'" "",¡¡ 0 3 2004 Title Production Technical Assistant Signature Phone 564-4657 Date 1 122/04 nQ'h'~<\" ¡~l J ( ( 14-09B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 09/24/03 Drift w/ 2 1/8in dummy gun t011317 SlM unable to loc tbg tail6?' of fill 09/25/03 T/I/O=1350/280/470. TBG Fl @ 4023'. IA Fl @ 402' for (E-line). 09/26/03 SET IBP @ 10973' 09/28/03 T/I/O=1340/260/420. Temp=SI. Bleed TBG & IA (Prep for CMIT). TBG Fl @ 4406' (or 49 bbls). IA Fl @ 420' (or 23 bbls). Bled TBG from 1340 psi to 940 psi in 1.25 hrs. Final WHP's=940/220/420. 09/29/03 TIO= 940/220/420. Temp=SI. Bleed TBG & IA. (Prep for CMIT). TBG Fl @ 3326' (51 bbls). Bled TBG from 940 psi to 240 psi in 1.5 hrs. lAP decreased 120 psi during TBG bleed. Monitor for 30 min no change in TBG or IA pressure. Final TBG Fl @ 11761 (20 bbls), IA FL @ 936' (55 bbls). Final WHP's 230/100/420. 09/30/03 T/I/O = 230/100/420. Temp= cold/SI. Monitored WHP's (Post TBG and IA pressure bleeds). TBG and IA pressures remained unchanged overnight. 10/01/03 T/I/O=240/140/450. Temp=SI. Monitor WHP's. (Post TBG bleed). Tubing pressure increased 10 psi lAP increased 40 psi and OAP increased 30 psi overnight. IA has and Integral installed. 10/02/03 TIO=250/150/400 (AC-CMIT) PASSED. load IA with 40 bbls of diesel & 40 bbls of crude to CMITTxlA to 3000 psi. Pressure bled off 80 psi on tbg & 100 psi on IA 1 st 15 minutes 40 psi on tbg & 50 psi on IA in 2nd 15 minutes for a total pressure loss of 120 psi on tbg & 150 psi on IA in 30 minutes. Bleed pressure down. Final TIO = 450/200/400. 11/19/03 T/I/O=360/280/470, TEMP=SI. PRESSURE OA WITH All (PREP FOR SQUEEZE); INITIAL OA Fl AT 1000' (58 BBlS), PRESSURED OA TO 800 PSI WITH All GAS AND THE OA FL WAS 1130'. MONITORED FOR 30 MINUTES AND THE OAP DROPPED TO 760 PSI AND THE Fl DROPPED TO 1200'. RE-PRESSURED TO 800 PSI, 30 MINUTES lATER OAP WAS 760 PSI AND THE FL WAS 1270'. REPEATED AND THE FINAL OA Fl WAS 1320' (77 BBlS). FINAL WHP'S=360/280/800. 11/20/03 T/I/O=41 0/320/740, TEMP==SI. RE~PRESSURE OA WITH All (PREP FOR SQUEEZE); OAP DROPPED FROM 800 PSI TO 740 PSI OVERNIGHT AND THE OA Fl DROPPED 100'. INITIAL OA Fl AT 1420' (82 BBlS), PRESSURED OA TO 800 PSI WITH All GAS. MONITORED FOR 30 MINUTES AND THE OAP DROPPED TO 790 PSI AND THE Fl DROPPED 20'. RE-PRESSURED TO 800 PSI. THE FINAL OA Fl WAS 1430' (83 BBlS). FINAL WHP'S=41 0/320/800. 11/21/03 T/I/O=420/370/780, TEMP=SI. BLEED OA (PREP FOR SQUEEZE); OAP DROPPED FROM 800 PSI TO 780 PSI OVERNIGHT. INITIAL OA Fl AT 1450' (84 BBlS) (20'. DEEPER THAN YESTERDAY). BLED OA FROM 780 PSI TO 290 PSI IN 2 HOURS. FINAL OA Fl WAS 1330' (77 BBlS). FINAL WHP'S=420/370/290. 11/21/03 T/I/O=420/370/780, TEMP==SI. BLEED OA (PREP FOR SQUEEZE); OAP DROPPED FROM 800 PSI TO 780 PSI OVERNIGHT. INITIAL OA Fl AT 1450' (84 BBlS) (20' DEEPER THAN YESTERDAY). BLED OA FROM 780 PSI TO 290 PSI IN 2 HOURS. FINAL OA Fl WAS 1330' (77 BBlS). FINAL WHP'S=420/370/290. 11/22/03 T/I/O=420/370/300. TEMP=SI. MONITOR WHP'S (POST OA BLEED). OAP INCREASED 10 PSI OVERNIGHT. 11/24/03 TIO=500/400/340. (PRE-CEMENT SQUEEZE) PUMPED 160 BBlS OF CRUDE @ 1.2 BPM 1000 PSI. DOWN OA. FWP= 500/400/400. Page 1 ( 14-09B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/25/03 T/I/O=500/380/160. Well is SI. OA downsqueeze. MIRU Dowell to OA. PT lines to 3000 psi. Start down OA with 10 bbl methanol spear at 2.0 BPM, Switch to CW1 01 surfactant increase rate to 4.7 BPM. Pumped 20 bbls CW101, 200 bbls fresh water, 15 bbls CW101 surfactant, 5 bbls fresh water space. SD batched up cement. Pumped 15 bbls Arctic set 1. w/ 1/4# per sack of celloflake, and 15 bbls Neat Arctic set 1 followed up with 5 bbls fresh water spacer at 4.4 BPM. Displace cement with 123 bbls of crude, at 113 bbls crude away cut the rate to 1.0 BPM for 5 bbls, then dropped the rate to 0.5 BPM for the last 5 bbls of crude. SD pumps and monitor OAP for 15 minutes. OAP decreased from 740 psi to 400 psi. Estimated cement top @ 2227'. Will MITOA in 3 days. Final WHP's=500/440/400. 11/30/03 TIO= 420/360NAC. MIT-OA FAILED. LLRT- 13 GPM @ 760 PSI. (POST DOWN SQUEEZE). INITIAL OA FL NEAR SURFACE. STARTED PUMPING DOWN OA. OAP INCREASED TO 760 PSI AFTER PUMPING 1 BBL. OAP DID NOT GO ABOVE 760 PSI. START LLRT - OC ESTABLISHED A LLRT @ 13 GPM @ 760 PSI. TOTAL TEST TIME 25 MIN, TOTAL TEST VOLUME PUMPED 397 GAL. PUMPED TOTAL OF 18 BBLS OF DIESEL. DID NOT BLEED OA PRESSURE DECREASED FROM 760 PSI TO 500 PSI IN 30 MIN. FINAL WHP'S 420/360/500. FLUIDS PUMPED BBLS 58 Diesel 1 0 Methanal 35 CW101 210 Fresh Water 15 Arctic set 1 w/1/4# per sack of cellaflake 15 Neat Arctic set 1 321 Crude 664 TOTAL Page 2 ( { TREE = GRAY GEN 2 I I WELLHEAD = GRAY 14-09B SAFETY NOTES: TxlA COMM. ACTUATOR = AXELSON KB. ELEV = 71' BF. ELEV = -i4-1/2" CAM BAL-O SSSV NIP, ID = 3.813" I KOP= 2300' (I) Max Angle = 56 @ 7600' Datum MD = 11203' GAS LIFT MANDRELS Datum lV D = 8800' SS ST MD lVD DEV TYÆ VLV LATCH PORT DATE 1 2643 2566 20 TE DMY BK 0 08/14/03 2 5145 4429 48 TE DMY BK 0 I 13-3/8" CSG, 72#. L-80. ID = 12.347" I 3 6774 5581 51 TE DMY BK 0 08/22/03 4 7647 6081 56 TE DMY BK 0 Minimum ID = 2.375" @ 10873' 5 8408 6586 45 TE DMY BK 0 3-1/2" MERLA PATCH 6 9074 7085 38 TE DMY BK 0 7 9702 7584 36 TE DMY BK 0 I TOP OF 7" TIEBACK LNR I 8 10326 8112 27 TE DMY BK 0 08/14/03 *9 10891 8612 31 TE * * * *PERMANENT PATCH ACROSS GLM #9 14-1/2" TBG-PC, 12.6#, N-80, .0152 bpf, ID = 3.958" I 2204' -i 4-1/2" X 3-112" XO I I TOP OF 3-1/2" TBG-PC I 17" LNR-TIEBACK. 29#, L-80. .0371 bpf, ID = 6.184" I I TOP OF 7" LNR I I 9-5/8" CSG, 47#. L-80, ID = 8.681" I -I 3-1/2" MERLA PERMA NENT PA TCH I -I 3-1/2" BAKER SBRASSY I -i 7" X 3-1/2" BAKERSAB PKR I -i BAKER IBP (09/26/03) I -i 3-1/2" CAMCO DB-6 NIP, ID= 2.75" 1 13-1/2" TBG-PC, 9.2#. L-80 ,.00870 bpf, ID = 2.992" I -i 3-1/2" BAKER SHEAROUT SUB 1 11034' -i 3-1/2" TUBING TAIL I ÆRFORA TION SUMMARY I l-i ELMD IT LOGGED 04/22/82 I REF LOG: BHCS ON 04/10/82 ANGLE AT TOP PERF: 35 @ 11128' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-5/8" 4 11128 - 11148 0 06/06/92 2-5/8" 4 11168 - 11190 0 06/06/92 2-5/8" 4 11200-11210 0 06/06/92 2-1/2" 4 11240 - 11274 0 08/21/91 2-1/2" 4 11254 - 11274 0 08/21/91 2-1/2" 4 11286 - 11306 0 08/21/91 2-5/8" 4 11312-11349 0 07/28/85 11277' 35' SWS TS 1-3/8" FN; 1-11/16" aD; 2-1/8" 4 11354 - 11373 0 06/22/86 2 BOW SPRING TYPE CENTRALIZER 2-1/8" 8 11373 - 11377 0 06/22/86 2-1/8" 4 11377 - 11384 0 06/22/86 11383' PERF GUN STRIP I 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" 1-1 11849' I [!£] 11860' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BA Y UNIT 04/18/82 ORIGINAL COM PLErION 08/22/03 JJ/KAK GL V C/O WELL: 14-09B 04/04/02 RN/TP CORRECTIONS 09/26/03 MJArrLH SET IBP PERMIT No: 1820340 03/02/03 JK/KAK GL V CORRECTIONS 12/05/03 T JPrrLP SAFETY NOTE CHANGE API No: 50-029-20534-02 03/27/03 JrvvTLH GL v UPDATE SEC 9, TION, R14E, 457.26' FEL & 2390.15' FNL 04/28/03 A TD/TLH WAIVER SAFETY NOTE 08/14/03 JCrvvTLH GL V C/O BP Exploration (Alaska) GeoQuest 500 W, Inlernalional Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 9174 Company: -Alaska 0il & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 1/5/95 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar Floppy Disk I~ <~. 3-13 -7 ~ ! INJEC PROFILE (12-4-94) I 1 '~. 3-14 -7 c) .:_ ~'Z- BACK-OFF RECORD (12-3-94) 1 1 D.S. 9-5A ,C/ '~_.~ 6'~C~ STATIC BHP SURVEY (12-9-94) - I 1 D.S. 11-24A c/c~ :~2-O (-~ PROD PROFILE (12-6-94) 1 ,1 D.S. 14-9B ~ ~-~ O~ PROD PROFILE (12-8-94) I 1 D.S. 14-24 ~,~ ~C~ PERF RECORD (12-6-94) 1 1 D.S. 14-35 ~ :~--) U~. PROD PROFILE (12-7-94) I 1 D.S. 16-20 '0 '~"-" ,~T~" ~ PROD PROFILE (12-6-94) I 1 D.S. 17-2 ~0-' 0'~ O STATIC BH PRESS SURVEY (12-10-g4) 1 I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALASKA(, , AND GAS CONSERVATION C(~' 'AISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate Pull tubing Alter casing Repair well Olher X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stral~graphic 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, T10N, R14E, UM At top of productive interval REcEiVED 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth JUL 1 1 1994 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, UM At total depth AJasl~a, J~[l & Gas COilS. Comll~OI1 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM , ~jldlora[t8 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-9B feet 9. Permit number/approval number 82-34 10. APl number 50 - 029-20534-02 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 11860 feet 9412 feet Plugs(measured) Tagged Fill @ 11182' MD (5/5/94) Effective depth: measured 11182 feet true vertical 8854 feet Junk(measured) 'ORIGINAL Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx 80' 80' Surface 2656' 13-3/8" 4400 sx Cl G 2727' 2709' Production 7655' 9-5/8" 500 sx Cl G 7726' 6268' Tieback Liner 5555' 7" 800 sx Cl G 7423' 6052' Liner 4426' 7" 1340 sx Cl G 11849' 9404' Perforation depth: measured 11128-11148'; 11168-11190'; 11200-11210'; 11240-11274'; 11286-11306'; 11312-11349'; 11354-11373'; 11373-11377'; 11377-11384' true vertical 8810-8826'; 8842-8860'; 8869-8877'; 8901-8929'; 8939-8955'; 8960-8990'; 8994-9010'; 9010-9013'; 9013-9019' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, N-80, PC tubing @2204' MD; 3-1/2", 9.2#, L-80, PC tubing @ 11034' M D Packers and SSSV (type and measured depth) 4-1/2", BaI-O SSSV @ 2186' MD; Baker SAB packer @ 10960' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Reoresentative Daily Avera0e Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 132 396 593 -- Subsequent to operation 434 1019 1619 -- Tubing Pressure 213 211 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x_~ Gas .__ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed J~')~~ Form 10-404 Rev 06/15/88 /'-.~ ...J"'~./... (~,~,a,/~ ~,, Title / 1126/9 KRF cc: JED, JWP Engineering Supervisor SUBMIT IN DUPLICATE 14-09B DESCRIPTION OF WORK COMPLETED TUBING PATCH INSTALLATION & REFRACTURE TREATMENT OF ZONE 4 4/23/94: RIH & set a 2.375" ID Merla Permanent Tubing Patch from 10873' to 10894.5' MD (seal to seal), in the 3-1/2" tubing, across leaking GLM #9 located at 10880' - 10887' MD. Rigged down. 4~24~94: RIH & tagged PBTD at 11333' MD. 4/25/94: MIRU CTU & PT equipment. Made multiple runs w/CT to dump bail a total of 400 lbs 20/40 mesh sand, followed by 50 lbs Calcium Carbonate, to spot an Pre-Frac isolation sand plug over the lower open perforation intervals located at: 11312' - 11349' MD (Z4) 11354' - 11384' MD (Z4) Ref. Log: BHCS 4/10/82. Made a final top of sand plug tag at 11317' MD. POOH w/CT. Rigged down. 5/1/94 - 5/2/94: MIRU & PT equipment. Performed a high rate Injection Profile, indicating that the sand plug was leaking. Retagged the top of the sand plug at 11336' MD. RU for Data Frac & PT equipment. Pumped a Data Frac through the perforations located above the sand plug (listed above), consisting of 200 bbls 20# Pre Pad Gel @ 25 bpm, followed by an additional 740 bbls 20# Pre Pad Gel while logging a Spinner from 11290' to 11100' MD, followed by Shutdown. ISIP @ 2200. Noted that 50% of fluids pumped were going into perfs below the 10306' MD Frac target. Retagged top of sand plug at 11336' MD. RU CTU & PT equipment. RIH w/CT & pumped 8 bbls of Gelled Sand Slurry, containing a total of 1700 lbs of 20/40 & 30/60 mesh sand, to raise the top of the sand plug to cover an additional open perforation interval located at: 11286' - 11306' MD (Z4) Ref. Log: BHCS 4/10/82. Displaced the CT w/32 bbls Seawater & made a final top of sand plug tag at 11275' MD. POOH w/CT. RU Frac equipment. PT equipment to 10000 psi. Pumped a Hydraulic Refracture Treatment using 16/20 mesh proppant, through the perforations located above the sand plug at: 11128' - 11148' MD (Shublik) 11168' - 11190' MD (Shublik) 11200' - 11210' MD (Shublik) 11240' - 11274' MD (Z4) Ref. Log: BHCS 4/10/82. Pumped 280 bbls 40# Crosslinked Pad @ 35 bpm, followed by 693 bbls Crosslinked Slurry w/proppant concentrations @ 1 - 7 ppg, followed by 72 bbls Flush, followed by Shutdown. Placed a total of 66,500 lbs of proppant into the formation. Rigged down. 5/4/94: RIH w/CT & jetted a proppant fill cleanout down to 11240' MD. 5/5/94: RIH & tagged PBTD at 11182' MD. Placed the well on production w/gas lift & obtained a valid production test. RECEIVED JUL 1 1 1994 Dit & Gas Cons. Commission ARCO Alaska, Inc. P.O. Box 100360, A~ .borage, AK 04-27-94 i/-'qniect Profile i 1, 5" 15-32 16-18i 18- 26ST1 02-19-94i / Vertilo~ i I 5" 04-11-94 t JPerf Record ': 1, 5" I 04-20-94 Sch Sch Sch i /"Parr Record i 1, 5" Sch 04-15-94I /Leak Detect I 1, 2"&5" Sch 04-26-94 ~ /Perf Record ! I 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 04-19-94i /"Completion 04-11-94 04-10-94 05-01-94 04-18-94 05-01-94 !/Injection Profile 04-23-94 I / Patch 14-40 i 04-21-94 1 ~ Production 15-7A i i / TDT-P 15-7A i i~CTU Conveyed i PDC & Static Sch Sch Sch Sch Sch Sch Sch Sch / Patch I Sch 04-22-94 /CTU Production i 1,2" 5" Sch 18-27 i 04-23-94 /CTU Production i 1, 5" Sch DS#6-22A the correct depths are Btm. 10473/Top 10465 DS#9-19, the correct APl# is 50-029-20260-00 DS#18-28ST1 the correct APl# is 50-029-22329-00 Number of Records: 53 · DeGrey Distribution: Central Files Phillips Chevron ANO-8 Geology BPX Exxon State of Alaska Mobil Please acknowledge receipt by signing and returning a copy of transmittal· By: ~ ~c~zp Date: ARCO AlasKa, Inc. Is a Sub$1dl~y of AtiantlcRIchfleldCompany ARCO J.1ASlrA, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 6-19-92 REFERENCE: 3-26 6-14 7-1 '11 - 16ST 11 - 16ST ll-16ST 12-6 14-9B3 Z--~g 14-10 14-11 14-18 ARCO CASED HOLE FINALS 5-~.x-92 cci. (peri) mm x, 5-29-92 CCI. (chemical cutter) l~_m 1, 5-31-92 CCL (peri) Run 1, 5" 5-30-92 MAI Acoustic Filtered Wavefonms Run 2, 5-30-92 BHC/MAI Comp. Slowness Curves Run 2, 2'&.~' 5-31-92 PFC-GR Run 1, 5-3 1-92 Tubing Cutter/Goex Segmented Run 1, 5" ~.7-92 cc~ tper~ ~n x, 5-24-92 Vertilog Run 1, 6-4-92 PFC-GR l~_m 1, 5-31-92 Packer Setth~ Run 1, 5" 5-31-92 CNL/GR/CC~ Run 1, Please sign and return the attached copy as receipt of data. RECEIVED BY ~:~._ ~ Sonya Wallace ATO- 1529 Alaska 0ii & Gas Cons. Commission Anchorage # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL APPROVED ~~__ ~---"' Trans# 9212~-/---~-~-- # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ~KA TEXACO * The correct APl# for 14-9B is 50-029-20534-02. Atlas Atlas Atlas Atlas Atlas Atlas Sch Atlas Atlas Atlas Atlas Atlas Sch Sch STATE OF ALASKA .,~'-;~-'~," ' ALASKAf .AND GAS CO. NSERVATION C(~' AISSION0 REPORT UF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, TION, R14E, UM R E C E IV E D At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth J U L 1 0 1992 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, UM Alaska 0ii & Gas Cons, C0mmiss[oa At total depth Anchorage 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM 6. Datum of elevation(DF or KB) 71 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-9B 9. Permit number/approval number 82-34 10. APl number 50 - 029-20534-02 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 11860 feet Plugs(measured) true vertical 9412 feet Effective depth: measured 11806 feet true vertical 9368 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx 80' 80' Surface 2656' 13-3/8" 4400 sx CI 'G' 2727' 2709' Production 7655' 9-5/8" 500 sx CI 'G' 7726' 6268' Tieback Liner 5555' 7" 800 SX CI 'G' 7423' 6052' Liner 4426' 7" 1340 sx CI 'G' 11849' 9404' Perforation depth: measured 11128-11148'; 11168-11190'; 11200-11210'; 11240-11274'; 11286-11306'; 11312-11349'; 11354-11373'; 11373-11377'; 11377-11384' true vertical 8810-8826'; 8842-8860'; 8869-8877'; 8901-8929'; 8939-8955'; 8960-8990'; 8994-9010'; 9010-9013'; 9013-9019' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, N-80, PC tubing @ 2204' MD; 3-1/2", 9.2#, L-80, PC tubing @ 11034' MD Packers and SSSV (type and measured depth) 4-1/2", Bal-0 SSSV @ 2186' MD; Baker SAB packer @ 10960' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure · 225 1550 932 941 479 f' 1978 1092 920 Tubing Pressure 236 234 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas ..... Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. /3. Signed ~ (~;), .~ ~ --- Title Senior Engineer Form 10-404 Rev 06/15/88 // 758JWS c' SW, JWP Date SUBMIT IN DUPLICATE SUMMARY OF WELL OPERATIONS ARCO Alaska, Inc. perforated DS 14-9 at selected intervals in the Sag River and Shublik formations of the Prudhoe Bay Unit on 6/5/92 (11128- ll148'MD, 11168-11190'MD, l1200-11210'MD Ref Log: BHCS 4/10/82). Produced fluids were in the wellbore at the time of perforating. A short summary of the work is given below. - Began perforating operation on 6/5/62. - RU perforating unit and pressure tested equipment to 3000 psi. - RIH w/ gun # 1, tied-in, and shot # 1:11200-11210'MD @ 4 spf. - POOH. All shots fired. - RIH w/ gun #2, tied-in, and shot #2:11168-11190'MD @ 4 spf. - POOH. All shots fired. - RIH w/ gun #3, tied-in, and shot #3:11128-11148'MD @ 4 spf. - POOH. All shots fired. - Secured well. RD. RECEIVED JUL 1 0 199 Alaska Oil & Gas Cons. Anchorage JLB 6/25/92 STATE OF ALASKA ALASK/~~' 'L AND GAS CONSERVATION C~r~ MISSION REPORT' F SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, UM At total depth 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM 5. Type of Well Development Exploratory Stratigraphic RECEIVED 0CT 1 4 1991 Alaska 0il & Gas Cons. C0mm'tss'tot~ Anchorage 6. Datum of elevation(DF or KB) 71 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-9B 9. Permit number/approval number 82-34 10. APl number 50 - 029-20534-02 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2656' Production 7655' Tieback Liner 5555' Liner 4426' 11860 feet Plugs(measured) 9412 feet 11806 feet 9368 feet Junk(measured) Size Cemented Measured depth 20" 300 Sx 80' 13-3/8" 4400 SX Cl 'G' 2727' 9-5/8" 500 sx Cl 'G' 7726' 7" 800 sx CI 'G' 7423' 7" 1340 sx Cl 'G' 11849' True vertical depth 80' 2709' 6268' 6052' 9404' Perforation depth: measured 11240-11274'; 11286-11306'; 11312-11349'; 11354-11373'; 11373-11377'; 11377-11384' true vertical 8901-8929'; 8939-8955'; 8960-8990'; 8994-9010'; 9010-9013'; 9013-9019' Tubing (size, grade, and measured depth) 4-1/2", 12.6,9, N-80, PC tubing @ 2204' MD; 3-1/2", 9.2#, L-80, PC tubing @ 11034' MD Packers and SSSV (type and measured depth) 4-1/2", Bal-0 SSSV @ 2186' MD; Baker SAB packer @ 10960' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 372 282 811 -- Subsequent to operation 1269 ~"'" 1927 ~ 964 ~ ............. -- Tubing Pressure 230 241 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: OilX Gas._. Suspended..._. Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 758JWS c: SW, JWP Date SUBMIT IN DUPLICATE DS 14-9B DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF ZONE 4 8/21/91: Reperforated: 11240 - 11274' MD (Z4) 11286 - 11306' MD (Z4) Ref. Log: BHCS 4/10/82. 8/24/91: RIH w/CT to tag bottom, then pumped 17 bbls of sand slurry (containing 2400 lbs of 20/40 & 300# of 100 mesh sand), to place a sand plug covering the lower open perforations at: 11286 - 11306' MD (Z4) 11312 - 11349' MD (Z4) 11354 - 11373' MD (Z4) 11373 - 11377' MD (Z4) 11377 - 11384' MD (Z4) Ref. Log: BHCS 4/10/82. 8/25/91: RIH & tagged top of sand plug at 11282' MD. 8/26/91: MIRU & PT equipment to 9000 psi. Pumped a Hydraulic Fracture Treatment through the open perforation interval located above the sand plug at: Pumped: 11240 - 11274' MD (Z4) Ref. Log: BHCS 4/10/82. a) 240 bbls Uncrosslinked Pre Pad, @ 25 bpm, followed by b) Shutdown. ISIP @ 1813. Resumed pumping: c) 215 bbls 40# Gelled Pad, @ 25 bpm, followed by d) 295 bbls Sand Slurry in 1-10 ppg stages @ 25 bpm/5750 psi, followed by e) 2 bbls Flush, followed by f) Shutdown. Placed a total of 19,200 lbs of proppant into the formation. Rigged down. 8/27/91 & 9/21/91: Performed sand plug/proppant fill cleanouts to 11385' MD. Returned well to production & obtained a valid welltest. RECEIVED OCT 1 4 1991 Alaska Oil & Gas Cons. Commission Anchorage ARCO ALASKA, IN(]. P.O. BOX i00S66 ANCHORAGE, ALASKA DATE' 9-t 9-9f REFERENCE' ARCO CASED HOLE FINALS x.')-S 6-..-9~ PERF RECORD RUN ~ 5 ~2-6 5-S~-9i F'ERF RECORD RUN ~, 5' '-~-9 8-~6-°~ PERF RECORD RUN ~, 5' ~ ~6 5-S~-9~ PERF RECORD RUN ~S-27 8-16-9t PERF RECORD RUN t, ~ ~' F'E F' ~5-5 5--24-~i F'ERF RECORD RUN i , 5' 5-i~'~, 8-28-9i PERF RECORD RUN t, 5' -~2 e-~6-.i F'~F' R~CORD RUN i, T-it 6-Se-DJ PERF RECORD RUN i, 5' 7-28 7-2S-9i F'ERF RECORD RUN i, 9-i8 8-i8-9t F'ERF RECORD RUN i, S' -i i -6 7-22--9i i- E,.F RECORD RUN i, · -42-i4 8-6-9i PERF RECORD RUN i, 5" · i2-28 5-29-9i F'ERF RECORD RUN i, 5" .i3-28 8-i9-9i PERF RECURD RUN 't4-9B 8-2i-9i PERF RECORD RUN i, 5" xi5-25 8-i-9i PERF RECORD RUN t, 5' PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS RECEIF'T OF DATA. RECEIVED B Y ~~_J~~~ HAVE A NICE DAY! SONYA WALL. ACE ATO-i 529 HLS i-ILS HL$ HLZ HLS HLS HLS HL$ HLS HL$ HL_S HL$ HLS HL$ HLS HLS HL_S HL£' HLS HLS HL.S HLS DISTRIBUTION CENTRAL. FILES C H E V R 0 N D & M EXTFNSION EXF'LORATION EXXON MARAI'HON MOBIL ~ PHiL. LIPS F'B WELL FILES R & D '"' BPX -.-'"' STATE OF ALA$1<A TEXAC:O * THE CORRECT AF']:~: FOR f-tB I$ 56-029-2t007-0i. ~ THE CORRECT AF'I~ FOR 2-~ IS 5~-~29-2~77. ~: THE CORRECT AF'I" FOR S-27 ]:2 5~-~29-2ii~9. % THE CORRECT LOG INT. FOR 5-.i2 IS 88~6'-9249'~ $ THE CORRECT AF'I~: FOR t4-9B IS 50--029-20~:S4-(:,2. RECEIVED OCT 0 5 199 Oil & ~a; Cons. STATE OF ALASKA . ALASI~'~' ')IL AND_.GA~,.S..?O..N.SE. RV.y..A_,TI.ON,.( ~M..~IS..S[ON.0..R IGIN APPLICATION t-u Ar'P uvAL Abandon ~ Suspend Operation shutdown ..-- Re-enter suspended well ~ Alter casing Repair well Plugging Time extension Stimulate X Change approved program ~ ~ Pe'~'~ate ~"~'er Pull tubing Variance 1. Type of Request: 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development X Exploratory Stratigraphic Service 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, UM At total depth 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM 6. Datum of elevation(DF or KB) 71 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-9B 9. Permit number 82-34 10. APl number 50 - 029-20534-02 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Sudace 2656' Production 7655' Tieback Liner 5555' Liner 4426' 11860 feet Plugs(measured) 9412 feet 11806 feet 9368 feet Junk(measured) Size Cemented 20" 300 sx 13-3/8" 4400 sx Cl 'G' 9-5/8" 500 sx Cl 'G' 7" 800 sx Cl 'G' 7" 1340 sx Cl 'G' RE([EIVED JUN - 6 1990 Naska Oil & Gas Cons. commission Measured ~tt~ra~e vertical depth 80' 80' 2727' 2709' 7726' 6268' 7423' 6052' 11849' 9404' Perforation depth: measured 11240-11274'; 11286-11306'; 11312-11349'; 11354-11373'; 11373-11377'; 11377-11384' true vertical 8901-8929'; 8939-8955'; 8960-8990'; 8994-9010'; 9010-9013'; 9013-9019' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, N-80, PC tubing @ 2204' MD; 3-1/2", 9.2#, L-80, PC tubing @ 11034' MD Packers and SSSV (type and measured depth) 4-1/2", Bal-0 SSSV @ 2186' MD; Baker SAB packer @ 10960' MD 13. Attachments Description summary of proposal X Detailed operations program BOP sketch X 14. Estimated date for commencing operation June 1990 , ou x__ 16. If proposal was verbally approved Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer FOR COMMISSION LI.~I= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED ElY Date J Approval No. ~C:~ ,_ 15. Status of well classification as: Gas Suspended . Approved by order of the Commissioner Form 10-403 Rev 06/15/88 399 LBL cc: J. Gruber, ATO-1478 LONNIF- C. 51411T1-1 P1114-9B]W1-3 Date SUBMIT~ IN TRIPLICATE Drill Site 14-9B Zone 4 Fracture Treatment Preliminary Procedure Fracture treat DS 14-9B as follows: 1. MIRU fracturing service company. 2. Pressure annulus to 3000 psig. . Pump the propped fracture treatment in intervals: 11240-11274', 11286-11306', 11312-11349', 11354-11373', 11373'-11377' and 11377-11384 MD, referenced to the CBL log dated 4/10/82, using gelled water and Carbolite or LWP proppant at 25 bpm. Preliminary pump schedule is listed below. 300 bbls Pre-Pad 4OOO bbl Pad. 1325 bbl Slurry at 1-12 PPG with 233,000 lbs Proppant. Flush to perfs. . . . . RDMO fracturing service company. Cleanout excess proppant to PBTD with CTU if needed. MIRU slickline to tag fill and replace gas lift valves. Place well on production. RECEIVED JUSt - 6 990 Oil & Gas Cons. Commission A~chorage 5 4 3 2 i ! COILED TUBING UNIT BC~ EOU ] PHENT 1. ~:)00 PSI '7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/10" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC: SLIPS 4. 5000 PSi 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 4 RECEIVED JUN - 6-1990 ~.laska 0il & Gas Cons. Commission Anchorage NIREL ]NE BOP EOU l PllENT 1. 5000 PSI 7" WELLHEAD O:)NNEC:IC)R FLANGE 2. 5000 PSI WlRELIN£ RAlaS (VARIABLE SIZE) :~. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW lUBE P^¢K-OFF STATE OF ALASKA ALASK/~"' L AND GAS CONSERVATION C(''~ MIS_S/O~'~ ~ ,~--o APPLICA 'ION FOR SUNDRY APPRO / LS Abandon Suspend Operation shutdown ~ Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate 1 ~ Type of Request: Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, UM At total depth 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM Pull tubing Variance 5. Type of Well Development X Exploratory Stratigraphic ~ Service Perforate X Other 6. Datum of elevation(DF or KB) 71' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 14-9B 9. Permit number 82-34 10. APl number 50 - 029-20534-02 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Sudace 2656" Production 7655' Liner 4426' 11860 feet Plugs(measured) 9413 feet 11806 feet 9368 feet Junk(measured) Size Cemented Measured depth RECEIVED 13-3/8" 4400 Sx. 2727' lo ~ ~ 7726' 9-5/s" 500 Sx. NOV 2 [ 7" 800 Sx,~ ~ ~ ~;;:,~a .0ii & (]aS Cons. Com~[$$iol~ 11849' '~ ~nch0raff3 True vertical depth 80' 2709' 6268' 9404' Perforation depth: measured 11240-11274'; 11286-11306'; 11312-11349'; 11354-11373'; 11373-11377'; 11377-11384' true vertical 8901-8929'; 8939-8955'; 8960-8990'; 8994-9010'; 9010-9013'; 9013-9019' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, N-80, PC tubing @ 2204' MD; 3-1/2", 9.2#, L-80, PC tubing @ 11034' MD Packers and SSSV (type and measured depth) 4-1/2" BaI-O SSSV @2186' MD; Baker SAB Packer @10960' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation December 1989 16. If proposal was verbally approved Name of al)prover Date approved Service 17. I hereby~..~ertify that the foregoing is true and correct to the best of my knowledge. // Signed ,~f~'~~~~ Title Operations Engineering Manager FOR COMMISSION HSE ONLy Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance /_he, z+. Mechanical Integrity Test Subsequent form required 10- 15. Status of well classification as: Oil ~ Gas Suspended Date .... Approved by order of the Commissioner ORIGINAL SIGNED Bi' LONNIE C. SMITI4 Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE PROPOSED PERFORATING DS 14-9B ARCO Alaska proposes to add perforations in the DS 14-9B producer in the Sag River formation of the Prudhoe Bay Unit. All wire line work will be done through 5000 PSI working pressure BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The purpose of the proposed perforating will be to provide effective drainage of the Sag River reserves. ,Ref: BHCS 4/10/82 Proposed Perforation Interval: 11128-11148' MD RECEIVED NOV 2 3 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WlRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF I,I ! REL ! NE BOP EOU ! PHENT i I ARCO Alaska, Inc.~ ~ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager July 14, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 14-9b Dear Mr. Chatterton: Approval No. 7-160 Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Very truly yours, D. F. Scheve DFS//jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI(DS 2-18)W1-3 RECEIVED JUL 2":' llaska Oil & Gas Cons. C, ora~ssior~ Anchorage Wells3/02 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~: Stimulate 5~× Plugging L3 Perforate ~ Pull tubing Alter Casing L-] Other L; 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 71' RKB Feet 3. Address 6. Unit or Property name P. O. Box 100360, Anchorage,AK 99510 Prudhoe Bay Unit 7. 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth 2375' FNL, 424' FEL, Sec. 16, T10N, R14E, tiM At total depth 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, UM Well number DS 14-9B 8. Approval number 7-160 9. APl number 50-- 029-20534-02 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 11.860 feet Plugs (measured) 9413 feet Effective depth: measured 11806 feet Junk (measured) true vertical 9368 feet Casing Length Size Cemented Structural Conductor Surface 80' 20" 300 SX Intermediate 2656 ' 13-3/8" 4400 SX Production 7655 ' 9-5/8" 500 SX Liner 4426' 7" 800 SX Perforation depth: measured 11240-11274'; 11286-11306'; 11312-11349'; 11354-11384' true vertical 8901-8929'; 8939-8955'; 8960-8990'; 8994-9019' Measured depth 80' 2727' 7726' 11849' Tubing (size, grade and measured depth) 4-~''2 , N-B0, 2205' and ~z,,a: , L-80 at 11034' MD Packers and SSSV (type and measured depth) Baker at 10960; Bal-0 at 2186' MD WueVerticaldePth 80' 2709' 6268' 9404' 12. Stimulation or cement squeeze summary Intervals treated (measured) SEE ATTACHED Treatment description including volumes used and final pressure Alaska Oil & Gas Cons. Com~issiot~ 'A~chof~ge 13. Prior to well operation Subsequent to operation · Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 550 600 672 --- 550 600 672 --- Tubing Pressure 250 250 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~F'~~-~~ Title ~~. ~/~' v~:~~ Date ~.~* Form 10-404 Rev. 12-1-85 Submit in Duplicate J.L. Brady - 265-4245 /~ DS 14-9B DESCRIPTION OF WORK COMPLETED EDTA SCALE INHIBITION TREATMENT ARCO ALASKA, INC. COMPLETED AN EDTA PRE-FLUSH AND AN AMINE PHOSPHONATE INHIBITOR SQUEEZE ON DS 14-9B. THE OPERATION WAS PERFORMED IN THE FOLLOWING MANNER: 4-25-87: 1) MOVE IN AND RU PUMP TRUCKS. 2) PERFORM INHIBITOR SQUEEZE AS FOLLOWS: 48 BBL OF EDTA. 121BBL OF AMINE PHOSPHONATE INHIBITOR BLEND. 630 BBL OF DIESEL. OIL WAS USED TO DISPLACE THESE SOLUT!ONS TO THE FORMATION. 3) WELL SHUT IN FOR 12 HOURS. ARCO . (~" Alaska, Inc Prudhoe Bay I=ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 12, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 14-9~ Permit No. 82-34 Dear Mr. Chatterton: Attached is the "Intention" Sundry Notice detailing work proposed on the above-mentioned well. Very truly yours, D. F. Scheve DFS/JLB/jp Attachment cc: Standard Alaska Production Company Pi(DS 14-9)W1-3 JLB2/22 ARCO A~aska, ~n¢. is a Subsidiary o! AilanticRichfie~dCompany STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM .,,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [ Stimulate I~ Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 71' RKB feet 3. Address 6. Unit or Property name PO BOX 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 1990'FNL, 896'FEL, Sec. 9, T10N, R14E, UM At top of productive interval 2183'FNL, 166'FEL, Sec. 16, T10N, R14E, OM At effective depth 2375'FNL, 424'FEL, Sec. 16, T10N, R14E, UM At total depth 2393'FNL, 448'FEL, Sec. 16, T10N, R14E, UM 7. Well number DS 14-9B 8. Permit number 82-34 9. APl number 50-- 029-20534-02 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 11860 feet 9412 feet Plugs (measured) Effective depth: measured true vertical 11806 feet 9367 feet Junk(measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured Length Size Cemented '11240-11274'; 11354-11384' true vertical ' 8830-8948' Measured depth True Vertical depth 20" 300 SX 80' 80' 13 3/8" 4400 SX 2727' 2709' 9. 5/8" 500 SX 11332' 8977' 7" 800 SX 7421' 5955' 7" 800 SX 11850' 9404' ~bing(size, grade and measured depth) 4½" N-80, 2205' and 3½" L-80 at 11034' Packers and SSSV (t~ys~j¢~?l ;m~aa~_u_r~)d adc_p~3~_86 Baker at ' 12.Attachments Description summary of proposal ~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation 14. If proposal was verbally approved Name of approver Subsequent Work Reported on Form No. ~Dated,2/~ ~_- Date approved 15. I hereby,qertify that~he foreg,.oing is true and correct to the best of my knowledge Signed ~x//c~.~~~~_ _ Title Operations Engineering Manager Date Commission Use Only Conditions of approval Approved by Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance ~..~p¢~ ~ ..~. ~ ........ Commissioner I Approval No. --~.~ /~ ~ by order of the commission Date ~' ---/~'~ -~'~ Form 10-403 Rev 12-1-85 Jerry 'Brady ATO 1430, ext. 4245 Submit in triplicate DESCRIPTION OF PROPOSED WORK ARCO Alaska, Inc. intends to perform an EDTA pre-flush and an amine phos- phonate inhibitor squeeze on DS 14-9. The operations will be performed in the following manner: 1. Obtain a well test. 2. Move and RU pump trucks. 3. Perform inhibitor squeeze as follows: 48 bbl of EDTA 121 bbl of amine phosphonate inhibitor blend 666 bbl of diesel Oil will be used to displace these solutions to the formation. 4. Shut the well in for 12 hours. 5. Obtain a well test. ARCO ALaska, lng~_ . _ Ancho'r~ge, ALa.~Ra 99~t0 TE:' Augu:~:t: I, I986 F-- lie R E N C E: A R C (.t C.. a .'-; e d i4,::.', I. e F' i n a I. r-, ....... ~'" O'F -I. 4-...C.~b"'~6--i_ "~.:---.::~.A_ C':o L La'r' r- ~..;~ ; a; ing ~.....- ,..,:: ~": -.. ~.:.:.. Z_ i:: ,.-:, ~. ~. ,.?, ;-- ~:' ~..-.:, ;-. ~' o-,.. ;:-, .~- i -,~ ,.~ t. ,:::, .:~. ~) .... 'i ~'; 6-i _.'.."'.----86 Co I. t.a'r' Pe'r' 'l"'o'r'a t- inq I. oq · .f..,. . 4 22 6- i 4'-" 86 C: o 1. L a ~-F:' e ~" 1'" ,.':.','r' a t: i n ,g i. o g '" "~ "- C c., 1. I. a 'r' P e'r' 'f" n 'r' a t. i ',."".. g I ;.; g 4 -.:. ''~ o, 6 .... t .::, -.'. ,::. ,_ ............ "::'--.-'::~ ~'- C: 6-.- t,...° ,..,.~'- .... 'i ,.... ,... ,.., ;", .... i. 1. a ¥'/d e p '~' h ,'.:1 e t' e 'r' m i n a !' i o 'n ... ~:~ e a 'f- (;.ea 'r C~ea'r r.:, e a 'r' [.;ca 'r' C-e a'r' .~,.,.....,,xc,...,, HAVE: i"..] ~A Y !AlasKa Oil & Gas Cons. commission Anchorage I... i 'n,'.:i a I--t u. i. c e A'i" 0 .... i ':~' 2 .... .,' .'. · r'eceipt: of da!'a. '"' IT x t. e n s' i o n E x p ~ r'~'r' a ",: i o'n 'II' . .. . ~. , ,11. · ,,. E x x o'n M a 'r' a t' h c.', n '"' H o 1:., i f. A t. a ...'i: I.:.' a STATE OF ALASKA ALASK( ..)IL AND GAS CONSERVATION COMJ .,ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate [] Plugging [] Perforate [] Pull tubing Alter Casing ~ Other [] 2. N~(~f ,O.,oer~tor 5. Datum elevation (DF or KB) AlaSKa, Inc. 71' RKB Feet 3. Ac~l(~s Office Box 100360, Anchorage, AK 99510 6. Unit or P~,ope[{y nar~e vruanoe uay Unit 4. Location of well at surface 1990' FNL, 896' FEL, Sec, 9, T10N, R14E, UN At top of productive interval 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM At effective depth 2233' FNL, 233' FEL, Sec. 16, T10N, R14E, UN At total depth 2393' FNL, 448' FEL, Sec. 16, TION, R14E, UN 7. Well number DS 14-09B 8. Approval number 82-34 9. APl number 50-- 029-20534-02 10. Pool Prudhoe Bay 0il Pool 11. Present well condition summary Total depth: measured true vertical 11860 feet 9412 feet Plugs (measured) Effective depth: measured 11384 feet true vertical 9019 feet Junk (measured) 11 384' MD Casing Length Size Cemented Structural Conductor 20" 300 SX Surface 13-3/8" 4000 sx Intermediate 9-5/8" 500 SX Production 7" 800 SX Liner 7" 800 sx Perforation depth: measured 11240-11274', 11286' true vert'~la~73-11377'" 11377-11384' 8901-9019' Tubing (size, grade and measured depth) 4½",N-80 @ 11034' Packers and SSSV (type and measured depth) Baker @ 10960'MD Measured depth Surf Surf Surf 1869' 7423' -11306', 11312'-11349, 11354' ~ue Vertical depth Surf Surf Surf 1869' 5956' 12. Stimulation or cement squeeze sUmmary Intervals treated (measured) Not Applicable -11373, RFCFI\IED J U L 1 8 1986 Alaska Oil a u,:~ {:,~:~n~. Cor[~,m{ssiO~3 Anci'~orag Treatment description including volumes used and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl 1075 2016 380 2250 4970 763 Casing Pressure Tubing Pressure 262 308 14. Attachments Daily Report of Well Operations 15. I hereby certify that the foregoing is true and Copies of Logs and Surveys Run [] correct to the best of my knowledge Form 10-404 Rev. 12-1-85 Date n~/DD~U~iJ/i c~a t~e Submit i Began perforating operation on 6/21/86. RU perforating unit and pressure tested equipment. RIH w/gun #1, shot interval 11240-11251' MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. RIH w/gun #2, shot interval 11251-11274' MD (4 spf), flowed well to cleanup. RIH w/gun #3, shot interval 11368-11391' MD (4 spf), flowed well to cleanup. Shut-in well, POOH, gun did not fire. RIH w/gun #4, shot interval 11354-11377' MD (4 spf), flowed well to cleanup. Shut-in well, POOH, all shots fired. Could not get all the way down hole. RIH w/gun #5, shot interval 11373-11384' MD (4 spf), flowed well to cleanup. Interval 11373-11377' MD was shot twice at 4 spf each time, total is 8 spf due to hole problems; shut-in well, POOH, all shots fired. Secured well. RD. Ref: BHCS 4/10/82 STATE OF ALASKA .~ ~/ · ALASKA~ AND GAS CONSERVATION CO[ /I. ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 82-34 3. Address 8. APl Number P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20534-02 4. Location of well at surface 9. Unit or Lease Name 1990' Fit, 896' FEL, Sec.9, T10N, R14E, LN Pru~ Ba~v Unit At Top Producing Interval 10. Well Number 2183' FNL, 166' FEL, Sec. 16 T10N, R14E, LlVl 14-098 At Total Depth 1 1. Field and Pool 2393' FNL, 448' FEL, Sec. 16, T10N, R14E, LN P~ Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Pmdhoe Bay 0il Po01 71' RKBI ADL 28314 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore I 16. No. of Completions 03/24/82 04109/82 04122/82I N/A feet MSLI 1 17. Total Depth (MD+TVD)118601lVD, 94121TVD 18. Plug Back Depth (MD+'I'VD)11384,lVD, 9019'TVD YES [~X 19. Directional SurveYNoF.1 [ 20. Depth where SSSV set2186 feet MD I21' Thickness Of PermafrOstl900' (Approx.) 22. Type Electric or Other Logs Run CBL, DIL/SP/~/GR, FDC/CNL/({~/Cal, OR/CBL/VDL/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 7" 23~ 500-95 1869' 7421' 8-1/2'. ~00 _qx £1aq_q G 7" 29~ L-80 7423' 11850' 8-1/2" 24. Perfora'tions open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) . . 11240' - 11274'1VD 4½"& 110~' 10o~' 11286' - 11306'MD 4 spf 3~" 11312' - 11349'{vD 4 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11354' - 11373'!VD DEPTH INTERVAL (MD) AMOUNT & KINDOF MATERIAL USED 11373' - 11377'MD N/A 11377' - 11384'~ 8901' - 9019'TVD r Ref: BHC. g 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 12/28/82I Rowing I Date of Test Hours Tested PRODUCTION FOR gl L-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 7/15/8~ 4.1 TEST PERIOD I~ 384 849 ~') (~I (~-~7') GAS-MCF WATER-BBL OIL GRAVITY-APl (co~"~v';~ Flow Tubing Casing Pressure CALCULATED gl L-BBL Press. 308 N/A 24-HOUR RATE ]~1~, 2250 4970 763 27.0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips~ RF !VED j U L 1 8 1986 AlasKa uu c~ ~.:~ Uui'is. Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. . :.. . . ~... ,, -:.,'~ :' .. , ·: GEOLOGIC MARKERS : ; . ...-.,- . ~ .. -.: NAME Inciuae interval tested, pressure ciata, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 11237 8899' N/A 0y~l Contact 11436' 9061' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true andcorrect to the best of my knowledge Signed _~~ ~~.. T,tle Regi°nal Engineer D.te ~y//~ INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so'state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional ini~:rval to be separatelY prodUced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.)° Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well ,~ Alter casing [] Time extension [] Change approved program ~ Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other [] 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska, Inc. 71' RKB feet 3. Address 6. Unit or,.Prop,~rty n~,me Post Office Box 100360, Anchorage, AK 99510 vruanoe uay Unit 4. Location of well at surface 1990' FNL, 896' FEL, Sec. 9, TION, R14E, UN At top of productive interval 2183' FNL, 166' FEL, Sec. 16, TION, R14E, UN At effective depth 2241' FNL, 244' FEL, Sec. 16, TION, R14E, UM At total deDth 2393' FNL, 448' FEL, Sec. 16, TION, R14E, UM 7. Well number DS 14-09B 8. Permit number 82-34 9. APl number 5o- 029-20534-02 10. Pool Prudhoe Bay 0il Pool 11. Present well condition summary Total depth: measured true vertical 11860 feet 9412 feet Plugs (measured) Effective depth: measured true vertical Casing Length Structural Conductor 20" Surface 13-3/8" Intermediate 9- 5/8" Production 7" Liner 7" Perforation depth: measured 11286' true vertical 8939' - 8990' Tubing (size, grade and measured depth) 4½" ,N-80, 11034' Packers and SSSV (tvD~ and measured depth) Baker, 10960 MD 11410 feet 9040 feet Size Junk (measured) Cemented Measured depth True Vertical depth 300 SX Permafrost 4000SX Fondu & 400SX ASII 500 SX Class G cmt 800 SX Class G 800 SX Class G - 11306' 11312' Surf Surf Surf Surf Surf Surf 1869 1869 7423 5956 12.AttaChments Description summary of proposal ~; Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation May 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby pf~rtify that the foreQoing is true and correct to the best of my knowledge m~//~~.~~ Title Operations Engineering Manager Signed Commission Use Only Date Conditions of approval Approved by Form 10-403 Rev 12-1-85 ,Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Rstu_..r ned ~ Commissioner Approval No. by order of ~ ~/~) ~),~ the commissiOn Date ~ '"'~;~,~;) '~ ~ Submit in triplicate ARCO Alaska, Inc. proposes to perforate DS 14-09B at selected intervals within the Sadlerochit Sand of Prudhoe Bay Unit. Upon perforating, the well will be flowed for clean-up. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Ref: BHCS 4/10/82 Proposed Perforation Intervals: 11240' - 11274', 11354' - 11396'MD 4 3 u II , 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF RECEIVED MAY 2 Z 1~8~ Alaska Oil & Gas Cons. Commi=sion H l REL I NE BOP EQU I PMENT ........................... s~ooe~oo6 ~' ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 Date: September 24, 1985 Reference' ARCO CH Finals 3-26 ~Temp Log 8-18-85 9-18 JDiff. Temp 8-9-85 9-18 /Spinner 9-11-85 9-18~ Temp'/Spinner 8-5-85 11-7 ~Spinner 8-1-85 -~.'.??~14-9B Te~,p Log 8-8-85 Run 1 5" GO 1 5" GO 1 5" Camco 1 5" GO 1 5" GO 1 5" GO Please sign as receipt of data. .4 -s boris. C°,~,rniSsiot] Pam L~bert AT0 1429C Trans 3~ Chevron ~ D & M PB 'Well Files Expl. Services R & D Ext. Exploratio~ Sohio' Ma.ra~on Texa~ - Mobil ,' ARCO Alaska Inc. ,$ a Su~.~idiar¥ of AtlanhcRichfieldComoanY ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telel3none 907 276 1215 DATE: MAY 20, 1985 REFERENCE: ARCO CH FINALS 3-14 ~ COLLAR LOG 3-23~/ COLLAR LOG 3-25 J COLLAR LOG 6-14 J TEMPERATURE 9-28 ~ CBL 14-9B~/TEMPE RATU R E 14-15 '~TEMPERATURE 14-20 ~-TEMPERATURE. 4-24-85 4-24-85 4-24-85 4-6-85 4-23-85 4-20-85 4-22-85 4-22-85 RUN 1 5" CAMCO 1 5" CAMCO 1 5" CAMCO 1 5" CAMCO 1 5" GO i 5" CAMCO 1 5" CAMCO i 5" CAMCO PLEASE SIGN AS RECEIPT OF DATA. RECEIVED BY PAM LAMBERT AT0 1429C TRANS 113 Chevron D & M Phillips Expl. Services PB Well Files Ext. Exploration R & D Exxon Sohio Marathon State of Alaska · Mobi 1 · Texaco ARCO Alaska, Inc.~ ''?~ Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 1215 DATE: MAY 14, 1985 REFERENCE: ARCO PRESSURE DATA /6-2 STATIC GRADIENT 4-28-85 /6-7 STATIC GRADIENT 4-28-85 7-7A STATIC GRADIENT 4-27-85 7-13 STATIC GRADIENT 4-27-85 /7-14 STATIC GRADIENT 4-27-85 ~.7-16 STATIC GRADIENT 4-29-85 /7-25 STATIC GRADIENT 4-27-85 /13-3 STATIC GRADIENT 4-25-85 /13-4 STATIC GRADIENT 4-25-85 /13-13 STATIC GRADIENT 4-25-85 13-14 STATIC GRADIENT 4-25-85 /13-17 PF0 w/LISTING 10-29-84 j13-23A FLOWING PRESSURE GRADIENT SURVEY /13-27 STATIC GRADIENT 4-25-85 CAMCO f13-29 STATIC GRADIENT 4-25-85 CAMCO /lq~gB!i!,~TATIC GRADIENT 4-26-85 CAMCO / 14-19 STATIC GRADIENT 4-26-85 CAMCO / 14-26 STATIC GRADIENT 4-26-85 .CAMCO ASE SIGN AS RECEIPT OF DATA.' CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMco CAMCO SCH W/LISTING 10-27-84 SCH RECEIVED BY PAM LAMBERT AT0 1429C TRANS ~10~hevron D& M Expl. Services Ext. Exploration Exxon Marathon · Mobil '~ 0ii & G~s Cons, .... · -~ Anchom.qe Mobil E & P" Phillips PB Well Files R& D Sohio State of Alaska .Texaco ,~,nci~o~acje. Aiaska 9~5iG Telephone 907 276 1215 Date: February 28. 1985 Reference: ARCO Pressure Data 9-2 Pressure Survey 11-30-84 GO -- 15-17 Pressure Survey 1-25-85 GO ~~ressur,~ Survey 10-28-84 Otis eceipt of d~ta. Received by Pam Lambert ATO 1429C Trans~ '..~ 5~ Chevron D&M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska. inc. P os,.t Ollice f'"'. 360 A n,.horaae.~, ska Telephone 907 2?? 563;' October 25, 1983 Reference' Arco Pressure Data D.S. 13-2A" 10-7-83 D.S. 14-3-" 5-8-83 D.S. 14-3 ' 8-28-83 ~ 8-28-83 D.'S. 14-7 ~/ 7-4-83 D.S. -14-7~ 8-31-83 D.$. 14-8~/ 6-1-83 · D.S' 14-8/ 8-31-83 D.S. 14-9B~'' 3-31-83 f' 3-31-83 D.S. 14-17/ 9-11-83 D.S. 14-18 ~>r 3-30-83 J3-30-83 D.S. 14-19/'8-11-83 ~" 8-11-83 D.S. 14-30'j 7-2-83 Static Survey PBU ?BU PBU Data Sheet Static Survey Static Survey Static Survey Static Survey PBU 'PBU Data Sheet Static Survey PBU PBU Data Sheet PBU PBU Data Sheet Static Survey Otis Camco GO Otis Camco Camco GO Camco Camco Camco Otis Otis ~Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans. # 598 Chevron D & M Dallas Drilling ~xxcn Getty 5[aratkcn DISTAIBUTION North Geoio~y Phillips Prudhoe Bay Sc?.ic State of Alaska ARCO Alaska, Inc. Post Office 360 Anchorage .... ;ka 99510 August 29, 1983 Reference' Arco Cased Hole Finals D.S. 3-19 j' 7-2-83 CBL/VD D.S. 4-8 ~,z 6-22-83 EPL D.S. 5-17 w/ 6-24-83 EPL D.S. 6-9~'' 3-3-83 Epilog D.S. 12-12/ 6-24-83 CET 7-23-83 CCL & Perforating Record 7-21-83 Completion Record D.S. 13-3~ 3-13-83 Epilog D.S. 13r7~' 3-12r83 Epilog D.S. 14-5- 8-22-80 Epilog D.S. 14-7/ 1-12-81 Epilog 3-9-83 Epilog D.S. 14-9B'j' 3-11-83 Epilog D.S. 14-24/ 6-30-83 CBL/VD D.S. 14-26~/ 2-27-83 Epilog D.S. 16-11`/ 7-30-83 Spinner Log Run 1 5" Sch Run 2 5" Sch Run 1 5" Sch Run 2 5" DA Run 1 5" Sch Run 1 .5" Sch Run I 5" Sch Run 1 5" DA' Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 2 5" DA Run 1 5" DA Run 1 5" Sch Run 1 5" DA 5" Camco ~//-'Please sign and return the attached copy' as receipt of data. Kelly McFarland ATO-1429F Trans. # 492 Chevron D&M Dallas Drilling Exxon Getty Mar athon Mobil DI STR!BUTI ON North Geology Phillips Prudhoe Bay R & D ~. Sohio State of Alaska · ARCO Alaska, Inc, x(~ Post Office Bo oO Anchorage, Alaska 99510 Telephone -307 277 5637 July 5, 1983 Reference: Arco Cased Hole Finals D.$. 6-20`// 4-27-83 D. $. 13-3 ',--/ 3-13-83 D.S. 13-7 / 3-12-83 Collar & Perf Log DDTNLL/GR DDTNLL/GR D.$. 13-98 f'3-6-83 C/O 13-6-83 CNL/MSN/GR .... 5-8-83 DIFL ~S-8-83 C/0 D.$. 14-7 3-9-83 D.S. 14-9B 3-11-83 DDTNLL/GR DDTNLL/GR Please sign and return the attached copy as receipt of data. Run 2 5" GO Run 2 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 1 5" DA Run 2 5" DA Run 2 5" DA Run 1 5" DA Kelly McFarland ATO-1429D Trans. # 419 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY .----'~ .:~: · D&M c~~~ STATE OF ALASKA- "~~' DAL LAS "~ CAROLINE SMITH · ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 360 AnChorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer June 9, 1983 Mr. C. V. "Chat" Chatterton State of Alaska Division of Oil and Gas 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: DS 14-6 DS 14-9B DS 14-11 DS 14-26 DS 14-29 Permit No. 78-65 Permit No. 82-34 Permit No. 80-131 Permit No. 81-110 Permit No. 81-168 Enclosed are the Completion Reports for work done on the above-mentioned wells. Very truly yours, D. F. Scheve Regional Engineer DFS/TKKW/lmi Enclosures cc: Sohio Petroleum Co. ARCO Alaska, thc. I~ m Submldlary of All~nttcRIchfieldCompany RECEIVED AJaska Oil & Gas STATE OF ALASKA , ALASKA( LAND 4MISSION · GAS CONSERVATION WELL COMPLETION OR RECOMPLETIO REPORT AND LOG 1. Status of Well Classification of Service Well OIL [~X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 82-34 3. Address 8. APl Number P.O. Box 360, Anchorage, AK 99510 s0-029-20534-02 4. Location of well at surface 1990'FNL, 896'F£L, Sec. 9, TION, R14[, UM At Top Producing Interval 2183'FNL, 166'FEL, Sec. 16, TION, R14E, UM At Total Depth 9. Unit or Lease Name Prudhoe ....Bay Unit 10. Well Number 14-9B 11. Field and Pool 2393'FNL, 448'FEL, Sec. 16, TlON, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 71 ' RKB I ADL 28314 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached I 14, Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 1'6. No. of Completions 3/24/82 4/9/82 I 4/22/82 J N/A feet MSL ) 1 17, Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD)[ 19. Directional Survey 20. Depth where SSSV set I 2i. Thickness of Permafrost l1860'MD 9412'TVD ll806'MD 9367'TVDJYES~] NO[] 2186' feetMD I 1900' (Approx) 22. Type Electric or Other Logs Run CBL: DIL/SP/BHCS/GR? FDC/CNL/GR/Cal, GR/CBL/VDL/CCL 23. CASING, LINER AND CEMENTING RECORD CASING SIZE ll 7 II WT. PER FT. 23¢ 29¢ 24. Perforation interval, size and number) GRADE 1_-88 SETTING DEPTH MD TOP 7423' BOTTOM 7471' llg60' open to Production (MD+TVD of Top and Bottom and HOLE SIZE R-1/2" i CEMENTING RECORD Class G 25. TUBING RECORD SIZE DEPTH SET (MD) AMOUNT PULLED ,, PACKER SET (MD) 11286'-11306'MD 4 spf 11312'-11349'MD 4 spf 8939'-8990' TVD Ref: BHCS 4-10-82 4-1/2" 3-1/2" 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production 12-28-82 Date of Test 3-3-83 Flow Tubing Press. 52 3 Hours Tested 12.4 Casing Pressure 28. I.Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR [OIL~BBL t GAS-MCF TEST PERIOD ~ CALCULATED GAS-MCF 24-HOUR RATE I~ 1661 OIL-BBL 2743 C0R E DATA WATER-BBL WATER-BBL 79 CHOKE SIZE GAS-OIL RATIO 50 I 606 OIL GRAVITY-APl (corr) 27.0 Brief description of lithotogy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED AlasKa Oil E Gas Cons, 6ommi~sion Form 10-407 Rev. 7~1-80 CONTINUED ON REVERSE SIDE Submit in duplicate ,"~,ME Inclucle interval tested, pressure data, ail fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 11237' 8899' N/A 0/W Contact 11436' 9061' · 31. L~ST OF ATTACHMENTS · 312. ) hereby certify that the foregoing ~s true and correct to the best o( my knoW~edge Signed . . -~ _ TitmeRegional Eng. Date .............. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supPly for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in:item 16, and in item 24 show the producing intervals for only the interval reported in item'27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ' Item 23:.. Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Prudhoe Bay Engineering Post Office Box 360 Anchorage, Alaska 995'i0 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer . May 25, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr' Chatterton: Re: D.S. 2-20 Permit No. 82-29 D.S. 2-24 Permit No. 82-71 D.S. 2-25 Permit No. 82-96 D.S. 14-6 Permit No. 78-65 D.S~ Permit No. 82-34 D.S. 14-11 Permit No. 80-131 D.S. 14-22 Permit No. 82-75 ~~ii~~Pe,rmitNo. 81-110 D.S. 14-28 Permit No. 82-12 D.S. '14-29 Permit No. 81-168 Enclosed are Completion Reports for work done on the above- mentioned wells. Very truly yourS~ D. F. Scheve DFS/JCD/cl Enclosures cc: Sohio Petroleum Co. Gas Conu t;ommlssiop STATE OF ALASKA ALASKA~C,,.;L AND GAS CONSERVATION C~iJ,.MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL D(]X GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Thc. 82-34 3. Address 8. APl Number P.O. Box 360, Anchorage, AK 99510 5o- 029-20534-02 4. Location of well at surface 9. Unit or Lease Name 1990'FNL, 896'FEL, Sec. 9, T1ON, R14E, UN Prudhoe Bay Unit At Top Producing Interval 10. Well Number 2183'FNL, 166'FEL, Sec. 16, TION, R14E, UN 14-9B At Total Depth 11. Field and Pool 2393'FNL, 448'FEL, Sec. 16, TION, R14E, UN Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 71'RKB ADL 28314 Prudhoe Ba,y Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 3/24/82 4/9/82 4/22/82I N/A feetMSLI 17. Total Depth {MD+TVD)18.Plug Back Depth (MD+TVD)19. Directional Survey [ 20. Depth where SSSV set I 21. Thickness of Permafrost l1860'MD 9412'TVD ll806'MD 9367'TVD YES~] NOI--1 2186' feetMD 1900' (Approx) 22. Type Electric or Other Logs Run CBL: DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, GR/CBL/VDL/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 7" 2~ S~lll-g5 1R69' 7421' R-1/?"'~ R(l~l~× £1a_~ R 7" 29# L-80 7423' 11850' 8-1'/2" 24, Perforations open to Production (MD+TVD of Top and Bottom and 25, TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4'1/2" & 110.~Z~' 1 flc~l ' 11286'-11306'MD 4 spf '3'1/2" 11312' -11349'MD 4 spf 26. ACID, FRACTURE, CEMENT sQuEEzE, ETC. 8939'-8990' TVD' ' ? ·DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED N/A Ref' BHCS 4-10-82 ., . . , 27. PRODUCTION TEST Date Firstl 2-Z8-82Production ~ i MethOdF1owi nq'°f Operation (Flowing,'gas lift, e~c.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO 3-3-83 12.4 TESTPERIOD I~ 50 ~: ~ 606 Flow Tubing Casing Pressure . CALCULATED ~ ~OIL-BBL ' .GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press: 523' ' ' ' 24~HOUR RATE ' 2743 1661 79 27.0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. , · , RE£EIVE ) . . , · JUN 1 ~ Oil & Gas Cons. commtssl0, ,/ Form 10-407 submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 11237' 8899' N/A 0/W Contact 11436' 9061' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge 2~-'~//~~~~j lit,eRegional Eng-4~'/~ ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate ,production from more than one interval (multiple completion), so state.:~in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a. separate form ~or each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records, for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, i'n~i~te "none". Form 10-407 ARCO Ala.s, ka, Inc. ~' Pos, Ottice B,. 360 Anchorage. Aiasks 99510 Telephone 907 277 5637 April 20, 1983 Reference: Arco Pressure Data D.S. 2-20 4-10-83 4-9-83 Pressure Build-up DA Pressure Build-up Survey Report D-S. 14-9B 12-28-82 Static Survey Camco 11-25-82 11-24-82 D.S. 14-19 Pressure Build-up Camco Pressure Build-up Survey Report ease sign and return the attached copy as receipt of data. Kelly McFarland AFA-4 03 Trans. # 291 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE OF ALASKA DALLAS ARCO Alaska, InC. B('.. Post Office 360 Anchorage. Alaska 99510 Telephone 907 277 5637 April 14, 1983 Reference: Arco Cased Hole Finals D.S. 2-11/ 12-27-82 ! D.$. 13-7 / 3-20-83 DoS. 13-17~ 2-17-83 2-19-83 C.A.T. Spinner Log EPL EPL Run 1 5" DA 5" Camco Run 1 5" Sch Run 2 5" Sch D,S. 14-9B~ 3-31-83 D.S. 14-18/3-30-83 Spinner Spinner 5" Camco 5" Camco D.S. 14-29 ~/? Spinner 5" Camco D.S. 18-1/ 2-16-83 , D,S. 18-3/ 3-28-83 '2-16-83 D.S. 18-6~ 2-16-83 CPL/Volan w/Listing ~ ~¢=~ CPL/Producibility w/Listing CPL/Volan w/Listing CPL/Volan w/Listing 5'" Sch Sch 5" Sch 5" Sch D.S. 18-7~ /2-17~83 CPL/Volan w/Listing 5" Sch D.S. 18-1 -25-83 CPL/Producibility w/Listing Sch ~-16-83 CPL/Volan w/Listing 5" Sch ease sign 'and return the attached copy as receipt of data. -~. Kelly McFarland AFA-4 03 Trans. # 273 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOB I L GETTY D&M STATE OF ALASKA DALLAS CAROLI .- ARCO Alaska, lnc. B(~x Post Office 360 Anchorage. Alaska 99510 Telephone 907 277 5637 March 31, 1983 Reference: Arco Magnetic Tapes w/Listings */D. S. 7-22 3-18-83 -~D.S. 13-7/ 3-12-83 5 pass DDNLL w/Sigma Ay. # 1646 DA OH # 68108 Run .1 Sch 5 pass DDNLL w/Sigma Av. # 1653 DA 13-98 ~/3-6-83 /b.S. 14-7 / 3-9-83 pass.CN/MSN # 1643 DA pass DDNLL w/Sigma Av. # 1655 . .DA pass DDNLL w/Sigma Ay. % 1652 14-9B~ 3-11-83 DA ,~ Exxon & Sohio - 1 copy previously sent by Schlumberger. sign and return the attached, copy as receipt of data. D5 13- 7~. d I ~ i / -.~-c,~_,..~r~ -~ l:...:'?.:x /: DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBIL GETTY D&M STATE 0~7~ S~ DALLAS d~-?/ ~ ~- ARCO Alaska, I~ Prudhoe~ -'ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer February 7, 1983 Mr. C. V. "Chat" Chatterton . Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Re: D.S. 14-6 D.S. I4-9B D.S. 14-11 D.S. 14-26 D.S. 14-29 D.S. 14-30 Permit No. 78-65 Permit No. 82-34 Permit No. 80-131 Permit No. 81-110 Permit No. 81-168 Permit No. 81-166 Enclosed are "Subsequent" Sundry Notices detailing work done on the above-mentioned wells.. Very truly yours, D. F. Scheve DFS/TKKW/kn Attachments cc: Sohio Petroleum FEB - 9 ]983 Anchorage ARCO Alaska, Inc. is a Subsldtery of AtlantlcRichfieldCompanY ALASK ,L AND GAS CONSERVATION C ,IMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. NameofOperator 7. PermitNo. ARCO Alaska, Inc. 82-34 3. Address 8. APINumber P.O. Box 360, Anchorage, Alaska 99510 50- 029-20534-02 4. LocationofWell 1990'FNL, 896' FEL, Sec. 9, TION, R14E, UM 2183' FNL, 166' FEL, Sec. 16, T10N, R14E, UM 2393' FNL, 448' FEL, Sec. 16, TiON, R14E, UM 5. Elevationinfeet(indicateKB, DF, etc.)RKB 71' [ 6. LeaseDesignationandSerialNO.ADL 28314 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D. S. 14- 9B 11. FieldandPool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations ~ Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent detailsand givepertinentdates, includingestimateddateofstartingany proposedwork, forAbandonmentsee20AAC25.105-170). Began perforating operation 12/25/82. RU perforating unit, pressure tested surfac. equipment. RIH with gun #1 shot 11329'-11349' MD 4spf (20' re/ CBL 4/16/82) flow well to tank for clean up'. POH all shots fired. RIH with gun #2, lost CCL going in. POH. Reload line. RIH with gun #2A, shot 11312'-11329' MD 4spf ( 17' re/ CBL 4/16/82). Flow well to common line for clean up. POH - all .shots fired. RIH with gun #3, shot 11286'-11306' MD 4spf ( 20' re/ CBL 4/16/82) Flow well to common line for clean up. POH, all shots fired. Run static pressure survey. Secured well 12/28782. FEB - e 1983 Alaska 0il & Gas Cons, C0mr~Jssi0n Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Conditions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. (~ Prudhoe Bay£ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer November 18, 1982 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Re' D.S. 13-26 D.S. 13-30 D.S. 14-9B Permit No. 82-74 Permit No. 82-101 Permit No. 82-34 Attached are "Notice of Intention" Sundry Notices work proposed on the above-mentioned wells. Very truly yours, a. F. Scheve DFS/TKKW/lmi Attachments cc: Sohio Petroleum ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany ALASKA LAND GAS CONSERVATION C MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. 2. Na,~R~oOp~rl~ka' Inc. DRILLING WELL [] COMPLETED WELL []~X OTHER [] 3'AdZe. s6. BOX 360, Anchorage, Alaska 99510 4'L°cf~no°'fwF~L, 896' FEL, Sec. 9, TION, R14E, UM 2183' FNL, 166' FEL, Sec. 16, TION, R14E, UM 2393' FNL, 448' FEL, Sec. 16, TION, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. RKB 71' ADL 28314 12. 7. Permit No. 82-34 8. APl Number 50- 029-20534-02 Pull Tubing 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 14-98 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [~X Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any pr~o~)d work, for Abandonment see 20 AAC 25.105-170). Alaska, Inc. proposes to perfbrate selected intervals within the Sadlerochit Sand for production from the Prudhoe Bay Unit. Upon perforating, the well will be flowed to the flow station for clean-up and production. Should additional drawdown be necessary to unload the wells, it may be flowed to a tank for initial clean-up. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to working pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. Proposed Intervals' 11253-11273' MD * 11286-11306' MD 11312-11349' MD Ref' BHCS 4/10/82 * To be perforated only if needed for rate. Subsequent Work l~epor~etl---~ ~-~ o, Form No. t~'qt)'? Date~l RECEIVED NOV 2 2 1982 Alaska'0il & Gas Cons. Commission Anchorage 14. I hereby c,ertify that the foregoing is true and correct to the best of my knowledge. Signed ~_~. ~. ~'_~__~--// Title Regional Engineer The space below for Commission use Conditions of Approval, if any: Approved by Form 10-403 BY LIltS?lIE C. SMITI! .Approved Copy P~eturned COMMISSIONER the Commission Submit "Intentions" in TriPlicate Rev. 7-1-80 and "Subsequent Reports" in Duplicate Post Oftice Box Anchorage.~ Alaska 99510 Telephon[~ ~7 277 5637 October 27, 1982 Reference' ARCO Magnetic Tapes with listings D.S. 13-16 9-30-82 DIL/BHC/LDT/CNL/CH CNL Mag. Tape' #ACC 65654 Run 1 D.S. 6-23 1 O- 17-82 Open Hole . Mag. Tape #65735 'Run 1 D.S. 14-9B 4-10-82 (Corrected) GR-CN, BHC AL, CDL Mag. Tape #ECC 1275 D.S. 14-21 7-7-82 CN/CDL, DIFL-BHC/AL Pass 1 & 2 Mag. Tape #ECC -1400 · e sign and return the attached copy as receipt of data. SCH SCH D/A D/A Becky Benedi ct AFA - 403 · Trans. #586 Note' Please see attached letter from Dresser/Atlas regarding the corrected tape on D.S. 14-9B. DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON . STATE OF ALASKA Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Post Office Box 360 Anchorage, ! ka 99510 Telephone 90, 277 5637 August 4, Reference: 1982 Arco Magnetic Tapes and Listings ~< D.S. 14-9B~''' 4-10-82 ECC-1275 ~ D.S. 13-18 ..... 4-26-82 ACC-65070 ~. D.S. 18-i~- 6-23-82 ACC-65252 D.S. 13-25~--~'' 7-1-82 ACC-65261 ~ D.S. 12-11~'~ 6-17-82 ACC-65232 ~D.S. 12-11~'~ 6-17-82 ACC-65232 DA (Corrected) Run 1 Sch Run 1,2,3 Sch Run 1 Sch Run 1 Sch (Answer) Run 1 Sch ,~ D.S. 12-10,~,~ 6-18-82 ACC-65235 Run · ~D.S. 12-10~ 6-18-82 ACC-65235 (Answer) _____~-__D -~' S' ~ ~ --~t~--~<~- ...... .6-29-82 ACC-65236 Run / ~D.S. 12-5 ~'~-2~82 ACC-65236 (Answer) D.S. 14-9B is a co-rrect'~d copy~f' the tape, the tape previously sent. 1 Sch Run 1 Sch 2 Sch Run 2 ~ please discard Please sign and return the attached copy as receipt of data. Kelly McFarland Trans. # 341 D ~STRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY Pt{ILLIPS' D&~f SOR"IO~ GEOLOGY MARATHON CHEVRON STATE OF ALASKAi I EC IVED ,AUG - 5 ]982 OIC:lE~S~:i~ INOUST~IIt:::S. INC. 583~) 01_0 SE~WAi~IO HIGhWaY. SUITI~ ~, ~.N(~HOR~GI~. ~LA~ 9~)502 ~077349-4~22 July 27, 1982 Arco Alaska, Inc. 711 W. 8th Avenue Anchorage, AK 99501 Dear Customer: It has come to my attention that the Dual Induction Focused Log values for~.well~14-9B, interval 7700-11100, was not processed correctly. Enclosed please find the corrected tapes and listers. Please destroy all prior tapes for well 14-9B dated 4-10-82. We are sorry for the inconvenience. If you have any questions, please feel free to call me at (907) 349-4622. Sincerely, ROBERT D. CHRISTENSEN Computer Operator Enclosures RDC:cac AUG - 5 1982 0il & Gas Cons. Commission A. chora.qe Anchorage, Alaska 995 ! 0 Telephone 907 "77 5637 June 30, 1982 Reference: ARCO. CASED HOLE FINAL LOGS D.S.2-15/'~ 5/21/82 D.S.2-11~ 5/2O/82 D.S.13-21W 5/23/82 D.S.13-24-/ 5/21/82 D.S.14'gB~' 4/16/82 D.S.2-20'~' 4/8/82 D.S'.2-21"' 4/27/82 D.S.6-2~/ 4/29/82 D.S.6-13~ 4/30/82 D.S 7-10~ , 4/29/82 D.S.12-7A~z 4/25/82 D.S.12-8B."' 4/3/82 D.S.13-21J 4/28/82 D.S.14-3~/ 5/2/82 D.S.15-4 J' 4/26/82 DS..15-4~ 4/8/82 D.S.15-4w' 4/19/82 CNL Run 2 5" · . CNL Run 2 5" ACBL/VDL/GR Run 1 5" ACBL/VDL/GR Run 1 5" CBL/VD Run 1 5" CNL/GR/CCL Run 1 5" CNL Run 1 5" CNL Run 4 5" CNL Run 4 5" CNL Run 4 5" Perf Record & CCL Run 1 Collar Log for Perforation EPL Run 1 5" CNL Run 4 5" CNL Run 1 5" 4 Arm, Caliper Run 1 5" CNL/GR/CCL Run 1 5" 1! Run 1 Please sign and return the attached copy as.receipt of data. 11 Mary F. Kellis North Engineering Transmittal # 247 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS' SOHIO' MARATHON CHEVRON EXXON MOBIL GETTY D&M GEOLOGY post Office Box 360 Anchorage, Alaska 99510 Telephone 9( 77 5637 June 7, 1982 Reference: ARCO CASED HOLE FINALS D.S. 14-9B/ 3/26/82 ~D~'S ~ 14-9B :' 3/27/82 D.S.6-3 3/.29/82 Casing Collar & Perf Log CBL/VDL CNL Run 1 RUn 1 Run 6 Please sign and return the attached copy as receipt of data. 1! 5" 5" Mary F. Kellis North Engineering Transmittal # 214 DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO:' MARATHON cHEVRON EXXON MOBIL GETTY D&M GEOLOGY Gas Cons. Commission ~chorage ~ ~ 9 10 r ~ CONDUCTOR 10 i~ I ;"' - ~' , 1~ ~ Y= 5,938,593.00 ,~ ' ~ " X= 674,539.61 ~ ~ ~T= 70o14 ' 16. 349" ~ ~ LON~ 148°34 ~ 57 020" C0~UCTOR 9 Y- 5,938,475.76 ~~ . 8~' ~T= 70°14'15 293" ' LON~ 148o34 ' 56. 293" 921' C0~UCTOR 9A , 94~' ' ' Y' 5,938,359.21 -.. X= 675,595.06 ~T~ 70014, 14.038" LON~ 148o34 ' 55. 567" TIONt RI4E, U.~. I" = ZOO' , DATE:DETAILS , II II 5'ITE 14/10, 9, 9A CoNOUCTO~ DRILL BUILT AtlenticR~hfieldCompany O DATE: DRAWING No: NORTH AMERICAN PRODUCING DIVISION ALASKA DISTRICT- PRUDHOE BAY · Telephone 907 277 5637 May 17, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.2-21JJ5/1/82 ACBL/VDL/GR Run 1 5" D.S.12-14~ 4/29/82 PLS Run 1 5" D.S.13-18~'~' 4/30/82 ACBL/VDL/GR Run 1 5" D~S.14-gB!~~' 3/8/82 C.A.T. Log Run 1 5" D~.S.14-9B~ 4/21/82 Gamma Ray Neutron Run 1 5" D.S.14-28J ~3/22/82 CBL/VDL Run 1 5'' '~ D.S.14-29~.v//'3/12/82 C.A.T. Log Run 1 5" D.S.15-3 3/23/82 CBL/VD Run 1 5" D.S.15-4j 4/22/82 ACBL/VDL/GR Run 1 5" D.S.15-14~/ 12/25/81 Collar for Gyro Correlation Run 1 D S.15-14~/ 12/25/81 CNL/GR Run 1 2"/5" D.S.I6-14/ 3/18/82 Perf Record W/CCL Run 1 5"/2" D.S.17-10j 4/7/82 PLS Run 1 5" D.S.14~30--" 5/8/82 Collar Log Run 1 5" D.S.14-5f' 5/8&9/82 Collar Log for Tattle Tale thru Tubing Vented Bridge ~ Plug Run 1 5-~'. D.S.14-29'~ 5/8/82 Collar & Perf Log Run 2 5" D.S.lr8~' 4/24/82 Diff Temp Log Run 1 5" ~~Pl~a~e sign and return the attached copy as receipt of data. 2"/5" Mary F. Kellis NOrth Engineering Transmittal ¢~ 170 DISTRIBUTION 'NORTH GEOLOGY R&D DRILLING. PHILLIps SOHIO MARATHON CttEVRON EXXO~ MOBIL GETTY. D&M GEOLOGY '" o 1982 - 0il & G3s Cons. Commission ARCO Alaska, Inc. Post Office [';ox Anchorage, ;'.!:','.k~ '.':~f: Telephone -'.!t.: 7 May 18, 1982 Mr. C. V. Chatterton Commi ssi one r ,. State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUB3ECT: State Reports - Prudhoe Bay Dear Mr. Chatterton: Enclosed are Well Completion Reports for the following drill sites: 12-7A 14-28 13-17 14-30 13-23A 15-3 ~i',14-9B 15-12 Also enclosed are monthly reports for April on these drill sites: 2-19 14-17. 2-20 15-4 2-21 15-5 13-18 Eileen #1 13.21 West Sak 24 Surveys for 2-19, 2-20, Eileen #1, and West Sak 24 are being reran; completion reports for these wells will be submitted when the corrected surveys ase.received. The reports on Eileen #1 and West Sak 24 are of a confidential nature. We would .appreciate it if you could stoce this information in a secure area. Sincerely, P. A. Van Dusen District Drilling Engineer PAV:JG/llm Enclosures' GRUS/A9 ARCO AI~s~;~. thc is .~ st,l~idi~r¥ ol Atla.ticRichlieldCompany ALAS A~',.K ,... ~ND GAS CONSERVATION C,.. !,~ .SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 82-34 3. Address 8. APl Number P, 0, Box 360, Anchorage, AK 99510 50-029-20534-02 4. Location of well at surface '1 | 9. Unit or Lease Name 1990'FNL, 896'FEL, See 9, TION, R14E,UMIi LOCATIONS · ' VERiFiED-1 Prudhoe Bay Unit At Top Producing Interval' 10. Well Number Surf._ i~ ,! 14-9B 2183'FNL, 166'FEL, Sec. 16, TION, R14E, UM B.H. F- , 11 Field and Pool At Total Depth __ · 2393'FNL, 448'FEL, See. 16, TION, R14E, UM Prudhoe Bay Fleld 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0il Pool 71' RKBI ADL 28314 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No' of Completions 3/24/82 4/9/82 4/22/82I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+I'VD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost l1860'MD 9412'TVD ll806'HD 9367'TVD YES~] NO[]I 2186' feetMD 1900' (Approx) 22. Type Electric or Other Logs Run CBL, DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, GR/CBL/VDL/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 7" 231f 500-95 1869' 7421' 8-1/2"'[ 800~× £1~.~.~ R 7" 29~ L-80 7423' 11850' 8-1'/2" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A 4-1/2"& ] 1 n-~a' lng~n, :$-1/2" 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD). AMOUNT& KIND OF MATERIAL USED N/A 27. PRODUCTION TEST .......... Date First Production I MethOd of Operation (Flowing, gas lift, etc.) I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TES1~ PERIOD ~ Flow Tubing Casing Pressure CALCULATEDI~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. N/ARECEIVED MAY 1 9 1982 · A!~ska 0il & Gas Cons. COmmission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GRUS/A22/23/2z~ 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadlerochit 11257' 8899' N/A O/N Conkact 114~6' 9061' 31. LIST OF ATTACHMENTS Drilling H±st:ory, Gyro Mul'ci Shot: (2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple comp!etlon), so state in item 16, and in item 24 show the producing intervals for only the interval reported in ite~ 27. Submit a separate.form for each additional interval to be separately produced~ showing the data pertinent to sUch interval. Item 21: Indicate whether from ground level (GL)or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 GRU3/B8 DS 14-9B Drilling History Accepted rig ~ 1200 hfs, 03/24/82. ND tree. NU BOPE & tested to 5000 psi - ok. Cite out 180 bbl (+) diesel. Cite & cond mud. Tstd 9-5/8" csg to 1000 psi - ok. Rerfd 7823'-7825' w/4 spf. Rumped 20 bbl water followed by 400 sx Class G cmt. Drld emt to retainer ~ 7805'. Drld retainer & cmt to 7830'. Cleaned out to 8050'. Ran CBL f/8050'-6000'. Cut 9-5/8" csg ~ 7726' & milled to 7771'. Rumped 150 sx Class G emt. Drld emt to 7720'. Dyna drld to 7771'. Tag btm of window ~ 7771'. Rumped 150 sx Class G cmt - disp to balance plug,~., Drld 8-1/2" hole to 10890'. Set RTTS ~ 2716'. Tstd 9-5/8" esg x DR annl - ok. Release RTTS. Contd drlg 8-1/2" hole to 11860' TD. Ran DIL/SR/BHCS/GR f/ 11838'-11070'. Ran FDC/CNL/GR/Cal f/11832'-11070', CNL/GR/Cal to 7722' & CNL/GR to 2700'. Ran 107 jts plus 1 marker jt of 7", 29#/ft, L-80, BTC lnr f/7723' to 11850'. Cmtd w/1340 sx Class G emt. Ran 126 jts 7", 23#/ft, S00-95 BTC fsg f/1869'-11850'. Top of tieback ~ 186¢'. Top of lnr 7423'. Cmtd w/800 sx Class G emt. Drld cmt to 11806' RBTD. Tstd csg to 2000 psi - ok. Displd to NaC1. Ran GR/CBL/VDL/CCL f/RBTD to 8800'. Ran 4-1/2" & 3-1/2" comp1 assembly w/tail ~ 11034' and pkr ~ 10%0'. ND BORE. NU tree & tstd to 5000 psi - ok. Closed SSSV ~ 2186'. Displd Ebg w/160 bbls diesel. Dropped ball & set pkr. Tstd w/3500 psi on tbg & 700 psi on annl - ok. Secured well & released rig ~ 2100 hfs, 04/18/82 Gyro multi shot survey ran 04/22/82. 3G/llm 0.5/13/82 GRU3/B8 RECEIVED ! 9 1982 Oil & Gas Cons. Commission P. O. Box 4-1970/Anchorage, Alaska 99509/(907) 349-4617 May 7, 1982 ARCO ALASKA, INC. P.O. Box 360 Anchorage, Alaska 99510 Well Number: 14-9B Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Gyro Multi Shot Date: 22-Apr-82 Method of Computation: Radius of Curvature Surveyor: D Pefferkorn Job Number: A0482G0432 Attn: Bob Hines Dear Mr. Hines, We are enclosing the original and sixteen copies of the Gyro Multi Shot Survey run on the above mentioned well. To date, the following distribution has been accomplished: A;''i copy telecopied to E/W North Slope office for delivery to ARCO field representives. B;''16 copies delivered to drilling for in-house distribution. C'' '3_copies for E/W permanent well files. We wish to take this opportunity to thank you for calling on our services and we trust that we may continue to serve your needs in the future. Sincerely, SHYAM TALWAR ~_ District Operations Manager ST/bb cc: file enclosure Directional Drillers/Sub-Sudace Surveyors/Instrument & Tool Rentals/Sales/Worldwide ,, 2 ~2 Eastman Whipstock A PETROLANE COMPANY REPORT of SUB-SURFACE DIREC TIONA L SURVEY ARCO ALASKA, INC. COMPANY DS 14, Well Number: 9B WELLNAME Prudhoe Bay, North Slope, Alaska LOCATION JOB NUMBER TYPE OF SURVEY A0482D0432 Gyro Multi Shot SURVEY BY D Pefferkorn DATE 22-Apr-82 F'RUDHOE BAY~ NORTH SLOF'E:, ALASKA Gtt~, O .... 1 J. 700 fid ~ SURVEYOR S D PEFFERKORN DATE RUN;~-Af ~""~ '"; 622 , GYRO NO~ ,.,,..,~., CAMERA NO; 1629 1644 5 -- 90 DEG A/U NO; 1562 .... FORESIGFIT'~ S30 080 ........................................ VERT'ICAL SE:CI' :I: ON CALCULAI'E:D" iN~ F'LANE':OF PROPOSAL DIRECTION1 ,'S 7 [lEG, O MIN. E ; RECOR[I OF' SURVEY RADIUS Of:' CURVATURE HF:.."TI'-IO.[I ~,.<-"~ 14 ~ WEL. L. ?-,!(ii: 9, B '~' R U D FI O_ El B A Y ~ N 0 R t' H S. L: 0 P E ~ el' L ~-,"c".:, k"" ._.;CJB NO~ .AO482G0432 ! '3 i ':2 0 } 01 0 7 - i"i A Y- S 2 DEF'TH ...... A h b L. I::. FEET D M D Fi'. I F T I) I R E C T I TRUE C:OURSE VERTICAL VERTICAL. ON LENGTH I:.iE P 1' H SECTION F' E E T F' E E T F' IE E T t C'dBSEA , 'T'VD F' E E T R E C' T A N O l.I C 0 0 R I) I N A F'EET I... A R C I... 0 S U R E D OGt,.EG T ii: .S r_;ISTANCE DIRECTION SEVERIT F' E E T D H D G / 100 F" . 100, 200, 300, 400. 0 0 '0 0 0 0 0 :1.5 15 0 0 S 84 N 29 S 37 0 O, 0.00 0,00 0 100, 100,00 0,00 0 W 100.' 200,00 -'-0,00 0 E 100. 300.00 -'0.32 0 W 100. 400,00 -0.51 -71;00 29,00 129,00 229,00 329,00 0.00 0.00 0,02 S 0.27 N 0.43 N 0.00 0.00 0 0 0.00 0.00 0.00 0 0 0.00 0.22 W 0.22 S 84 0 W 0,25 0.41 W 0.49 N 56 27 W 0.44 0,66 W 0,78 N 56 39 W 0.50 500, 600. 700. 800, 900. 0 0 0 0 0 15 15 1~o 0 N 47 N ".' N 90 N 80 0 0 E 100, 500,00 --0,29 0 E: 100, 599,99 -0,78 0 W 100. 699.99 -1,27 0 W 100, 799.99 --1~36 0 100. 899,99 -1,43 429,00 528,99 6'~8.-., 9'9 , ~'.8,99 828.99 0.24 0,77 1,23 1,27 1.31 0,44 W 0.50 N 61 45 W 0 0,07 W 0.78 N 5 27' W 0.~',) 0.39 W 1,29 N 17 3"2 W 0,63 0.82 W 1,52 N 32 56 W 0.04 1.04 W 1,67 N S8 24 W 0.25 1000+ 1100. 1200~ 1300. 1400. 1500, 1600, J. 700, 1800o 1900~ 0 15 S 60 0 1=. N C., :1.5 S '1 0 30 S 7 0 SO S 45 0 15 S 36 0 15 S 85 0 15 N 5 0 30 N 71 i 15 S :[4 0 E 100,:: 999.99 -1.30 0 E 100,:':! :1099,99 -1,41 0 W 100'o~ 1199,99 1 0 E: 100. 1299,99 -1.14 0 E: 100 ,,- '1'~ 9.~..~.E' 8 ......... - 0.33 E J. O0, 1499,98 ,.5, '"'-' · .. 0 E: 10. 0. 1. ,.~ 9' 9. ~o'-' ()_. 47 0 IE 100. 1699.98 0,26 0 W 100. 179' 9'. 98 - o... ,,..'-' c;... 0 E :£00. 169:,. 0 44 928,99 !028~99 1128¥99 1228,99 lo~8o98 14~8.98 1 .:'gq 98 1628.98 1728.9" 1828,96 1.20 N ,1.36 N,, ' 1',56 N 1.01 N 0,24 N 0.26 S 0,47 S 0,21 S 0.30 N 0.55 S 0.85 W 1.47 N 35 17 W 0.2:5 0.51 W 1.45 N 20 43 W 0.41 0.80 W 1.76 N~,")-;' 11 W ;".,.. 45 1.08 W 1o.48 N 46 57 W 0.47 0,71 W 0,75 N 71 9 W O,SS 0.28 W 0o38 S 47 40 W 0,26 0.09 E 0.47 S 10 ,..,"~S E 0.21 0.39 E 0,44 S 61 16 E: 0,35 0,06 E 0,30 N 10 38 E: 0,50 0,87 W 1,02 S 57 44 W 2000. 4100. 2200. '~ 2400, 4 :6 :8 11 ,, 0 S 5 15 S 6 15 S 9 45 S 10 45 S 11 0 W 100, 1999,89 4.12 0 E :[00~ 2099.69 10,40 O'E 100. 2199,27- 19.55 0 E 100, 2298.40 S2.58 0 E 100. 2396o79 50.34 1928,8~ 2128~27 2¥25.79 10.54 S 19,61 S 32.48 ,c..; 49.98 S 0.58 W 4,''>'? -' ~ ,., S 7 '16. W 1 0.52- W 10,~,~"5 S ,..c> 50 W 1,42 0,67 E 19,6°-. S i 58 E ..: 2.83 E 32,60 S 4 58 E 2,50 6,07 E 50,34. S 6 55 E 3,01 2600, 2700, 2800. 29'00, 45 S 15 C, S :1. 7 0 S 20 45 S :!. 9' 0 S 19 0 E 1.00. 2494,12 73.13 0 E: 100. 2590,05 100.97 0 E 100. 2684.31 133.67 0 E 100. 2777.10 170.05 0 E 100, 2868.89 208.85 2423.12 261~.31 2706,10 2797.89 72 99 166 .SO S .40 $ .04 S .16 cs .68 S 11~22 E 73,17 S 8 49 E: 3.14 18,99 E 101.19 S 10 49 E 3,30 29,58 E 134,34 S 12 43 E 3.16 42,02 E 171,39 S 14 11 El 1.79 54.94 E 210.95 S 15 6 E 1.25 ~S 14; WELL. NO~ 9~B GHS F.:. BAY ,~ NOF;?i"H S['OF;ES'~ Ai]'~S-I'<A' .................... JOB NO: -An482004-~° _ .... ..., ,% 13:20~01 07-'-HAY--82 I'RUE :lE'. A-S[J R~ErF-~iR I'F'T ................ DR'I F"l ............... [~00.. 't-~'~[E--C,.~'~'~E-C]~[~''' k;'E R 1"I CA L. DEF'TFI ANGi.,.E I)IRECI'ION I...ENL3TH DEPTFI SECTION FEET D M D i"i FEET FEET FEEl' 3000, 26 15 S 18 0 E 100, ~.9959,43 ...o'-'~'"0,46 S100 ~'~ , ,.d 45 S 18 0 E 100, 3048,12 295,78 -,._. ~, i7 "'O"'E ............... 10 0; ......... 31-3-4'~; 49- ....... 3'45, - 1 3300. 34 45 S J. 7 0 E 100, 3218.11 399.30 3400. 37 0 S .1.6 0 E 100. 3299.14 4.57.09 3500, 40 0 S 17 3600, 42 0 S 17 3700. 45 0 S 17 3800. 47 45,.,c:' ].7 39'00, 49 30 S :1.7 SUBSEA F;,' E C T A N G U l. A R C L 0 T VD C 0 0 R D I N A T E S D ISI'ANCE; F'E:EI' FEET FEET 2888.43 2977.12 3063';'49 3147.11 3228.14 0 E 100, 3377.39 518.48 3306.39 0 E 100. 3452.86 583.09 3¥81.86 0 E 100. 3525.39 650.87 3454',39 0 E 100. 3594,37 722,15 3523,37 0 E 100. 3660.47 796.05 3589.47 °43.94 S 68.41 E 253.35 287,85 S 82,68 E 299,49 335',89 S 97*82 E ~349Z84 moo,m_ S 113.85 E ,;04,66 444,50 S 130,49 E 463,26 ..... 504,18 S 148,17 E 525,50 566,92 S 167,35 E 591,10 632.74 S 187.47 E: 659.93 701.96 S 208,64 E 732.30 773,71 S 230.58 E 807.34 S U R E: DOGLEG D I R E C T I 0 N E; E: V E: R I T' Ih Fi 00/100F'" S 15 40 E 2,29 · S 16 ,-':> E .-"'> · 50 S 16 14 E 3, S 16 20 E ~-:~00 S 16 '?"' S 16 23 E 3''''~ S 16 27 E: -.">,,;,;. S .1.6 ,70 E ,.,:', O0 S 16 33 E .../,.,":' '"~':' S 16 5;6 E I .'"~:' 4000, 50 0 S 17 0 E: 4100. 50 0 S ].5 0 E 4200. 48 I5 S 16 0 E 4300. 47 0 S 16 0 E 4400~ 47 0 S 16 0 E 4500, 47 0 S 15 ' "'~," 47 46u0, ].~o S .1.4 4700,. 47 1.5 .'.3 .1.4 4800. 47 0 S :[4 4900. 47 0 S ;I. 4 0 E 0 E u E 0 E: 0 E: lO0,,i S725.08· 871.°1~. 100~:::;-3789.36 - 946.87 100.,')~.g854.80~:,1021.65 · ~ 100, 7 [3922.?0 :[ O0 ·' ':-,' 2,9..90 · : ,., . ..?; ,:',,' 1094.61 11z6.85,., 3654.08 3718,36: 3783.80 3919,40 100. 4058.59 1239.18 3987,59 100, 4126,64 ~Xll F~.x 4~='~ 100, 4194,52 1384.72 4:£23.52 100. 4262,56 1457.46 4191.56 100, 4330.76 1530,05 4259,76 846.70 S 252,89 E 883.66 920.33 S 274.00 E 960.26 993.19-S 294,21 E 1035,85 1064.21 S 314o57 E 1109.73 1134,51 S 334,73 E 1182,86 1204.98 S 354.28 E 1255.98 1°"'~:;~.,,.,~3.. S 37'~.62 E 1379_ ,,'73 1347,18 S 390.39 E 1402,61 1418,29 S 408,12 E 1475.84 1489,25 S 425.81 E 1548.93 S 16 38 E: 0.50 S 16 35 E: 1.53 S 16 30 E 1.9:L S 16 28 E: 1.25 S ].6 -)z ,:.o E: 0.00 S ].6 23 E 0.73 S 16 17 E 0 · 77 S 16 10 E 0,00 S 16 3 E: 0,25 S 15 57 E 5000, 47 15 S 14 0 E ~100, 47 1":; c 14 0 E · ..- , '... 5200, 48 0 S J. 6 0 E 5300. 48 0 S 19 0 E 5400. 47 0 S 21 0 E: :lO0. 4398.80 1602,78 4327.80 100. 4466.68 1675.67 4395.68 100. 4534.08 1748.82 4463.08 100. 4600.99 1821,88 4529.99 .1.00. 4668.55 1893.72 1560,36 S 443.54 E 1622.18 1631.61S 461.31E 1695.57 1702,97 S 480,42 E: 1769,44 1773,83 S 502,77 E 1843,71 1843.11 S 527.98 E 1917.24 S 15 52 E 0 S 15 47' E 0,00 S 15 45 E: 1,66 S 15 49 E: -"'"'.23 S :1..5 59 E 1.7'::',-, 5500, 47 15 S 21 ,.ovO, 47 J.~.., S,..'7'1 · ='~0"', ' ~/.,'u. 48 0 S --."~ 1 5800, 48 :1.5S 2.'1. 5900, 48 0 S 21 0 E: 0 E 0 E: 0 E: 0 E: 100. 4736.59 1964.83 4665,59 100. 4804.47 2036.08 4733.47 100. 4871.87 2107.76 4800,87 100. 4938.62 2180,00 4867,62 100 5005 3~ o,?~:;o .... ~--, 1911.53 S =55,1.25 E 1990.26 · "- I~' ¢'] ·' 1980,08 ~ ~o0.56 E: 2063.,1,1 2049.05~ o 607.04 E - ?137.08 2118.~'' S '33 .,o 6 .72 g 2':211.31 '~188.oo c' 660.40 g '>'-~ .... ~ ,-~, o ~=85.5,.' S 16 10 E 0,25' S 16 20 E 0.00 S 16 30 E 0.75 S 16 39 E: 0,25 S 16 48 E 0.25 iS 14, WEL. L HO~ 9.B GMS )RUDHOE BAY', NORTFI SLOF'E, ALASKA D E F' T Fi A N G L. E F E E 1' ]f:l M 6000 · 48 0 , 6100. 47 30 6200· 48 ZO ~ 6300 · 49 0 16400. 48 45 i 6500. 49 0 q" 6600. 49 0...c:; ~-..°2 6700, 50 0 S 21 6800. H1 4:' S '::' ~'' 6900· ,..~'~._, 0 S,,."~1 DRIF D I RECT D S 21 S 23 S 22 S ? ~z S 23 TRLIE 1' COURSE: VERTICAl_ ION LENGTFI DEF'TH H FE:E:I' FEEl' 0 E 100 '=" -'"':' - .... ,..,0 ,..,. · 28 0 E: i00 ..139 52 0 E: 100, ~ ~ r--., z ....,.,0.43 0 E: 100· ...,...-~;'--'-."-'. 36 E 100 '=:' TM''' ' .. · · ***,.-,J 6.1 ~ 0 E 100. 5403,90 0 E ~.00. 5469.51 · 0 E: 100 ':'":' ~* · ,., o,., ~ · 45 0. E: 100. ._,o .-. ,~' "- "' -/ . ~= .% 0 .F:: :i. 00, 56":"". 60.:.,b JOB NO; .A048'2GC43;2 VERI'I CA[. ._-.UB o E,--, SE(:; T I ON I'VI) FEE 1' FEE 1' · ~'z-,,, S6 5001 ·..:'-'8 o~F, 85 5068.5;2 2467.46 51 2539.91 5201 . 36 2~12,32 5267.1~ 2684.73 5332.90 2757.45 5398.51 2831'. 07 5463.45 29A -' ':' '"' . ,,._.. 17 ..,5~ 6.55 .-) ,..-, ,.q .-.~ · . 7'c:~'.. 85 ~Sjq · _,,.. 7.60 E: C ]' A N 0 0 R D I FEEl' ~.,,.. 45 S 2326.08 S 2394.74 S '~464 20 S 2533.54 S 2602.87 S 2672.60 S 2743."~':' S 2815.52 S .-.,--.,-, o S .':oo, · 21 l'l HE 13; :2::0: O1 D A T E 07 .... H A Y- 8 '~) GU L. A R NATES C L. 0 S U R E fJOGLEG D I S 1' A N C E: D I R E: C T i 0 N S E V E: R I T FEET D M I)G/iOOF 687,04 E 714,76 E 743,20 E 771,97 E 801.40 E 830,84 E 859,72 E 887,59 E 916,0:2 E 945,04 E 2359.69 S 16 56 E 0.00 2433.42 S 17 5 E 1.56 2507.41 S 17 15 E 1.25 2582.29 S 17 24 E 0.90 ~'~' 26 ~ ~o~,. S 17 ~3 E 0.'~5~. 2732.26 S 17 42 E 0 2807.47 S 17 50 E 0.,5 2883.36 S 17 56 E 1,26 2960,7<? S 18 1 E 1.91 3039.84 S 18 7 E 7000 · ~'= o.-, 0 R,. 2'~z 7100. 55 45 S 23 7200. 55 45 S 22 ?.-400,._ _o .55,. 45 S 2°=. 7400. 55 45 S 21 7500· 56 0 S 21 7600. 56 15 S 20 7700. 55 30 S 20 7800. 52 ZO S 10 7900, 49 0 S 0 0 E 100. 0 E: 100. ;:'. 0 E: :1. O0. 0 E: 100. 0 E: :[00. 0 E: 100~ 0 E".' 100. 0 E: 100· 0 E: 100. 0 E 100. 5717.37:-3061,17 5774.19"7-'-SI40,46 . -3,,~0,12 5830 47: ' ~ ' 5886 /~ 3299,96 .5943,.D3~-.3379 5646.37 2764.4S S 974·69 E 5.70~.1'9 3040,.50 S ..... 1006.18 E 5/,,9.47 3116.87 S 1037.81E ~ 7~ 193 5815.-~:' 3 .51 S 1068078 E .~oz~.O~ 32~0042 S ].099 07 E 5999.13 3460.31 5928·13 3347.70 6054.87 ,.~541 ·0~ o=: o q'~, ,. ,. · 87. o,~d~ -* o c' , 47, 61:[0.97 3621,69 6039,97 3503.25 ~ "'P 74 -'~' >169,74 3701.70 A~7o~ ~o81, 9 6233.00 3778.98 6162.00 3658.33 __ S 1128.74 E: S 11,..~':'7 . 81 E: S 1186,13 E S 1207.04 E S 1°1-~ 78 E 3120.60 S 18 12 E 2,16 3202.67 .,c: 18 19 E i . 11 3285.11 S 18 25 E: 0.83 3367,61 S 18 30 E 0.00 3450.16 S 18 35 Ii."' 0.83 3532.87 S 18 38 E: O,'''''"~ 3615.o=' oo S 18 41 E: 0 87 3698.61 S 18 4°., E 0.75 3779.23 S 18 38 El 8.zo,~ 3854,43 S 18 21 E: 8000. 46 15 S 0 0 8100. 46 0 S 1 0 8200. 45 30 S 1 0 8300. 45; 30 S 1 0 8400. 45 0 S 0 0 8500· 44 0 S 1 0 8600. 43 0 S 2 0 8700. 42 15 S 1 0 8800. 40 15 S 0 0 8900. 39 0 S 1 0 E: :!.00. E 100. E 100. E :LO0. E 100. W 100. W 100. E 100. E: 100. W 100, 6300.40 ~:' ~8o2.30 6369.70 3923.92 6439.48' '3995.16 6509.57 4066.09 6579.98 4136.65 6,,1.30 4206.14 6723.84 4274.22 6797',4~ 43'41;'35 6872.60 4406.86 6949.62 4470.09 ~.~,,:v.40 3 o~,19 S 6298,70 3804,28 S A368.48_ ~oR~'75.90 S 6438.57 S947o21 S 6508.98 4018,23 S 6580.30 4088.31 S 6652.84 4157.12 S 6726.42 4224.83 S 6801.60 4290.76 S 6878.62 4354~53 S 1213,78 E 1214.41E 1215.66 E 1216.90 E: 1°17.5?~ ~. E l°16,91.. E 11~,11 E 1.-~ 114,52 E ,:.15.09 E: 1214.5;5 E 3924.60 S 18 1E 2.75 3993.41 S 17 42 E 0.76 4062.07 S 17 25 E 0.50 4130.53 S 17 8 E 0.00 4198,63 S 16 51E 0.87 4265.58 S 16,.."15 E: 1.°'?~., 4331.07 S 16 18 E 1.21 4395.94 S 16 2 E 2.17 4459.49' S 15 4<? E ~.") 11 4520.73 S 15 35 E 1.40 14, HELL.. i',,lO: 9B Bi'iS :.lOB i'...!O: AO4::2,2r$o,132 I'ZNE D~TE f;rOD-RO-£'-L-'~'~'r, NOR T'FI' .SL~'O'P'~.~:'~ ..... AI:A'E;'K~- i3: 20 :'o i .... O'~"::Fi'i:-i"i,'::8~ "" I'Ri..IE tC.~EF'I'FI ANGLE: I)IRE:CTION I_ENGTH DEF'TH SECTION F E: E T D H D H F' E [il T F E E T F' E E T 9000, 9100, '-9200'; ....... 9300, 9400. 0 S 3 0 W 100. 7027.33 4532.24 1":'~, ..~ 4 0 W 100. 7105,46 4593.62 3'~ '" ~. ¢, ................ ~'0 ................. ~ ......... ~ ....... 9500, 9600, 9700. 9800, 9900, 5 0 W 100. 7263.59 4713.27 7 0 W 100. 7343~06 4772.41 9 0 W 100. 7422.53 4831.04 11 0 W 100. 7502,13 4888.92 13 0 W 100. 7582.38 4945.32 14 0 W 100. 7663.29 5000.38 16 0 W 100. 7744.70 5054.22 cs U B S F:- A FEET I ~-, N G U-"L. A R C L 0 S U R E C 0 0 R I) I N A T E S O I STANCE I)IRECTION FEET FEEl' D M 6956.33 4417.42 S 1212.34 E 4580.76 S 15 21 E 7034.46 4479.73 S 1208.53 E 4639.88 S 15 6 E: 7113.'26 454:[;05 S 1203T16' E' 4697;74 S 14 50 E 7192.59 4601.65 S 1197.33 E 4754.87 S 14 35 E: 7272.06 4662.01 S 1190.98 E 4811.74 S 14 20 E . 7351.53 4722.12 S 1182.54 E 4867.94 S 14 4 E: 7431.13 4781.73 S 1172.03 E 4923.27 S 13 46 E 7511.38 4840.08 S 1159.62 E 4977.05 S 13 28 E ..~.29 4897 "> S · ~3 S 1145.90 E 5029.51 13 10 E 7673.70 4953.32 S 1130.87 E 5080.77 S 12 52 E DOGL;EG SE:VER I 1" DG/100F' 1.26 0.98 1.33 0.79 1.24 :L. 73 0.59 100000 .,~"~,...o 1 ._, ':' S 18 0 W 10100. 31 1..5 .'.:]: "'~ 10200,, 28 45 S 24 0 bi 10300,, 27 0 S 29 0 W 10400 o/ , ...=_:, 0 b 34 0 W 10500 26 30 S '~'~ . . ' ,. .. · ~ 0 W 100 8267 lo 5301 76 10600. 27 0 S 43 0 W 100. 8356.46 5331.88 10700. 28 0 S 47 0 W 100. 8445.16 5360.30 10800. 28 45 S 46 0 'W 100. 8533.14 5388.56 10900. 31 SO S 49 0 W 100. 8619.63 5417.70 · . 7756.96 5006.27 S 1114.68 E 5128.86 S 1 ,..,uu6.0~ 1 E 5173 77 S 1 784'1 '" '9? '= "~'" '-~ .;:.9,,-.::, S 097.55 ¢,:.15 17 S 1 ,8016.98 5144.1'-,'-' S 1057.97 E 5251.86 S 1 8106~47 5182,22 S 10~4;67 E 5284.50 S :L · 8196,16 5217,77, S 1008,37 E 5314,31 ~','-' 1 8285.46 5251,73 S 5'78.84 E 5342.17 S 1 o v-~ ,, 16 528 S ,- S ~ ...... 4.37 946.20 E 5368.4o 1 8462.14 5317.08 cs 911.73 E 5394.69 S 8'."";48.63 5350.98 S 874., 73 E: 5422.01 S 2 33 E "~ 15 F I 56 [." 1 ;37'E 1 17 E 0 56 E 0 3,3 E: 0 9 E 9 44 E 9 17 E ':' 96 · ' . 1.."~5 3,20 ~ · C:,,, ..4. '~ 2. -":14 ,-) .::.~ .-~ · ,~.. s' 1.87 2.,10 0.89 11000. 33 0 S 50 0 W 100. 8704.20 5447.15 11100, 35 0 S 47 0 W 100. 8787.10 ~4/8% "' .82 1'1200. '36 0 S 53' O'W ' 100. ....... 88~8,51 .... 551'0.43 11300. 35 15 S 54 0 W 100. 8949.79 o~..,.12~='~" "~ £:~ . · ~ r" · ~ '1.1400. 34 45 b ~4 0 W 100 9031 71 o.'o~6,99 8633.20 ~o~.64o"' ~4.16 E 5449.86 S R716.10 ~4~>o 69 R 792.28 E 5480.96 q 8797.51 5460.00 S 747.82 E 5510.5'7 S ~7u.79 5494.64 S 701.00 E 5539.18 S 8960 71 ~=.~:-o,~ -. · o.u~o.~o S 654,59 E 5566.98 S 8 48 [:' 8 19 E 7 48 E: 7 16 E: 6 45 E: .59 .61 .62 .95 .50 11500. -'~ 0 S =;~ ~ 0 W 100. 9113.7~ 08 11600 34 0 S "~' ~""~ ...3 0 W 100 9196 16 ·40 ~ .... ~.J ,. ~o u W 100. 9279.1'8 o042.75 ~:;'::''"' 37 608 4-' ~'""'"'~ ,-,~o~. S , ,~ E ~.57 S 9'125 16 ~;~:;9' · =; ,':.;'=' .... 6.4,_ c:- .., _ o,..,, 40 E 5624.74 S · .,~.uo,18 5630~00 S 518.88 E 5653.86 S 6 15 E 5 45 E 5 16 E .62' .00 ;.-~ £:. "IE F'OL.L. OWIi',IG STATIONS ARE: F'F;,'OJE:CTE:I'~ FOR INTE:RF:'OLA'T'ION VALUES. ~,~S 14~ WELL +~0~ S:B GMS ~RUDHOE BAY~ NORTH SLOPE, ALASKA .lOB. f--~O ~ -A048"'G043''>~..: ... 1" I t'i E .D A 'fE ~ :20: 01 07-..t'~AY....82 T R U E iEASURED I)RIFI' I)RIFI' COURSE VERI'ICAL VERTICAL SUBSEA R E C 1" A N G U L A R C L 0 S U R E I)OGLi. EG DEF'TH ANGLE DIRECTION LENGTH DE:F'TH ,.[.CTION TVD C 0 0 R D I N A l' E S [;ISTANCE DIRECTION SEVERIT FEET' D H D M FEET: FEET FEET FEET FEET FEET D N DG/'IOOF" · 1806 ND - F:'BTI) :1. i806 :33 4~'" ~ 5S '0 j4 ............ 106" 9367 3:~ 71 -q"~ 5665 · ., .... 5680 9296 44 S 471 85 E 5685 05 S 4 46 E 0 O0 1860 HI)-. Tlr~ 11860 3:3 45 S ..3 0 W 54 9412 22 5695 71 9341.22 5683 49 S 447 89 E 5701 11 S 4 30 E' 0 FINAL L; I... 0._, LII:,. E .... Iq!RECTION ~ D I STANCE: S 4 DE':GS :30 NINS 21 SECS E 5701.11 FEET ARCO ALASKA, . .. F'RUDHOE BAY, NORTH SL. OF'E, AI..ASKA GHS, 0-11700 MD, SURVEYORI D PEF'FE;RKORN DATE RUN; 2"~-'-APR-82 GYRO NO~ ""5~:i .-, ..,622 CAMERA NO; 1629, 1644 5 - 90 DEG A/U. NO~ 1~o6.. ''~ FORESIGHT~ S30 08W iS 14~ WELL N[): S".B GMS JOB NO~ +?~0482G0432 TIHE DATE !RUDF'IOE BAY, NORTFI ,;.LI. FE.~ ~I...F.~oK~ 13:77;50 07-f~AY-8? ~ .............MA RKE R ............ T RUE: SUB SEA ', CODE .............. MEASURED VERTICAL M;)-TVD VERTICAL R E C T A N G U L A R C L 0 S U R E VERTICAL' ............ NAHE ................. DEF'TH DEF'TH DIFF' DEF'TH C 0 0 R [i I N A '~ E S DISTANCE DIRECTION THICKNESS ._. FEEl' FEET FEET FEET FEEl' FEET D TOP OF ,,A[L. EROCHII' 112:~7 O0 88'-78.58 23218.4 8827.58 5472.8'..' S 7E:0.49 E O/W CONI'ACT _. 11436.00 9061.24 2S74.8 8990.24 5540.60 S 6~8.05 E F'~I'D ....... i'"i80"6"~'O0 ......~'~'~-7-~--~'~-"-~'-3'8";~7 .....~'2'~'6";~2 ........ '5~665.44 S 471.85 E TD 11860.00 ~417.~2~. - 2447.8 ~41.~ 568~.4~ .S 447.89 E 5521.35 S 7 36 E ~ S 6 34 E 5577.~ 5685.05 S 4 46 E 5701.11 S 4 30 E !~--' :iRCO RLASI~ ~RUDHO..' E" E~F · ' ' : j~ i ? ' 'I~--NORTH · "' SURF. FICa: LOC~TION~ SNL;,' 896 t i · l - - - ' i , . l · ' I ' I I -FEETi l '.l I . . Eastman Whipstock A PE'[ROLAN£ COMPANY P. O. 8ox 4-1970/Anchorage, Alaska 99509/(907) 349-4617 April 12, 1982 ARCO ALASKA, INC. P.O. Box 360 Anchorage, Alaska 99510 Well Number: 14-9B Location: Prudhoe Bay, North Slope, Alaska Type of Survey: Directional Single Shot Date: 10-Apr-82 Method of Computation: Radius of Curvature Surveyor: D LeJuene Job Number: A0382D0305 Attn: Bob Hines Dear Mr. Hines, We are enclosing the original and one copy of the Directional Single Shot Survey run on the above mentioned well. To date, the following distribution has been accomplished: A. 0 copies telecopied to E/WNorth Slope office for delivery to ARCO field representives. B, 1 copy delivered to drilling for in-house distribution. C. 3 copies for E/Wpermanent well files. We wish to take this opportunity to thank you for calling on our services and we trust that we may continue to serve your needs in the future. Sincerely, District Operations Manager ST/bb cc: file enclosure Directional Drillers/Sub-Surface SUrveyors/Instrument & Tool Rentais/Sales/Woddwide · z~ ;lOB NUMBER %0382D0305 Eastman Whipstock A PETROLANE COM~ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ARCO ALASKA, INC. COMPANY DS 14, Well Number: 9B WELL NAME Prudhoe Bayr Morth Slope, Alaska LOCATION TYPE OF SURVEY Directional Sino!e Shot 10-Apr-8 2 SURVEY BY OFFICE D LeJuene Alaska ARCO ALASKA, INCo F'RUDHOE BAY, NORTH SLOF'E, ALASKA DSS, 7726-11800 H[a, [IRILLER: Ii LEJUENE JO~ N~O382D0305 TIE-IN POINT INTERF'ED AT' 7726 MD VERTICAL SECTION CALCULATE~.pL:ANE ,~~~~~ . . - ~ Whipstock A PETROLANE COMPANY RECORD OF SURVEY RADIUS OF CURVATURE METHOD "tI'~t.~U ALAbK~-'I~, INI.~, [mS 14, WELL NO: 9B [mSS F'RUDHOE ~ BAY i ...... NORTH-'~LOF'E~A~L-ASK~' JOB NO: AO382[m0305 WUMKU I A I iUN r'N~ ~u, TINE [mATE ' ': 5'4 ':' '0 5--12'=A F' R =82 ......... TRUE ~EA~SURE~T~RIFl----~RI~-F---C~DRSE-~ERT-IC~AK-~ERTI.~AFS~B~SEA----R-E--C-T-A-N-G--[F~-A-R .... C--L-O'-S-'U-R-'E .............. DOGLE DEF'TH ANGLE DIRECTION LENGTH ImEF'TH SECTION TVD C 0 0 RIm I N A T E S DISTANCE DIRECTION SEVERI FEET [J M D M FEET FEET FEET FEET' FEET FEET '7726. 55 30 S 22 0 E 6136,85 3639.86 6065.85 3525,86 S 1151.11 E 3709.01 S 18 5 E 0,00 ~7726'~M~-'IS-'TIE'~N-POIN~-FROM~?~ 7932. 48 45 S 0 30 W 206. 6263.25 3800.99 6192.25 3684.50 S 1181.23 E 3869.21 S 17 47 E 9.19 '8400; ......45 ........ O"-'S .... 1 ...... 3~-W .... 4'68T--'5'583~--4:3~8~6'512~1-1~0257'?~--S ii75,27-'E~41'?4:OO--S--1'6-I'6"'E-~.O"t82 8871. 40 0 S 5 30'W 471. 6?30.26 4451.87 &857026 4343.40 S 1155.85 E 44?4°57 S 14 54 E-- 'o' :1 9635. 36 45 S 14 30 W 764, 7529.13 4904.93 7458.13 4809,75 S 1073.59 E 4928,30 S 12 35 E v.85 10150. 35 0 S 20 30 W 515. 7946.42 5179.43 7875.42 5097.64 S 982.88 E 5191.53 S 10 55 E 0.7~ 10830. 28 45 S 47 0 W 680. 8523.59 5448.~0 8452.59 5393.41 S 785.25 E 5450.27 S 8 17 E 2.23 I 1-33 IT-- 3 5 ..... 0'-S--52--'~0--'~F---5'0' ,1-;---B'?'48¥B3---5'5 ~ ~'~'3~887 ~ ~55&-45'20--~-- --583'T5'1-~ 55 ~'4~ I~ S-- - 5'5 ?" E ..... 1"; 37 11800. 33 15 S 51 0 W 469, ...... ~337.06~30.32 9266.065727.08 S 376.90 E 573~.4& S 3 46 E 0.41 . FINAL CLOSURE - A PE'TROLANE C~PANY UK.I.I" I I.;HPIK I ' ti KI:,LR I Ir. Il LI~t I R I- ILl:. ARCO ALASKA, INC. I)S 14, WELL NO; 9B DSS P RU DHO £--B'A¥,---N 0 RT-~-_.' ---, ...... KA JOB NO; AO382D0305 'S I:JRVE Y-P! L~E-NUMBER~-~ ?]· B D T~D M-H D E'E--ASS EMBL-Y VALUES USED FOR DEPTH ARE MD DEF'TH DESCRIPTION Eastman 8018.00 ANGLE DROP ASSE~~~ ................................................... DRI'LLING DA' VALUES USED FOR DEF'TH ARE MD A PETROLANECOMPANY DAY DEPTH I 7726.00 2 7726.00 ................ 3 .................. 7830"e'00 4 8179.00 5 8931.00 6 9695~00 7 10519.00 8 10890.00 10 11331.00 11 118OO°O0 WEIGHT IS GIVEN PER 1000 POUNDS V'A'L-UES~SEIi'-FOR-~iEPTH--ARE-'M'T.r .i ....... DEF'TH ............... -: ...... WEIGHT "'7726';'00 "(77,00 8018.00 50,00 8931o00 50.00 · REVOLUTIONS PER MINUTE VAEUES-USED-'FO'R-'D'EPTH-~RE-'t~D ......... DEPTH '7726~00 ~;~00- 8018,00 140.00 8931,00 100o00 Eastman, t /hipstock A PE'['ROLANE COMPANY .7S COMPANY _l'~_ DATE ~ Purpose of Assy. 7"a ~";a/~ T~.a ~1~ SURVEYS FOR THIS ASSY. i / DRILLWITH w~,~Hv ~'~ ' PUMP _-,~/_~ 0 ~ Bit type~J~ & Knozzle size _ .. s~ ~'33 3,97 DATE Well # 9-~ Purpose of Assy. ~)r~ ~ SURVEYS FOR THIS ASSY. c~7/ I · DRILLWITH WEI~HT~ ,.~{~" - PUMP ,.~0 Bit type__2~ & Knozzle Size Hours on Bit · c3 'g7 3.9~ 2 9,$$ 7o'70 3 29.72. CO,',:PAN Y Cf DATE' ~ Purpose of ~~ Assy SURVEYS FOR THIS ASSY. DRILLWITH WEIGHT RPM . ,/0 0 , PUMP ~ ~ ~ ~ Bit type ~ ~- & Knozzle Size Hours on Bit- i i , : ~ . . .. , ,1. ' ' ,,," , ; . , I I I I I I I I I I ~ . , · ________- _____--~ ~'~ !::.- ":..~.:::::-':.l::lS::'~.4~.-_-~. ':_-J~'-'~:gB:sOS~_-. :.:"-':__-i-::5---:: ........... :: ~..~:-u"~-~-~", : z',,,~, ~ ,-- · -, ...... .---PRLtBI-tBE-BF~,--NR RTH--IiL--eI~,.-I~~ : ~'-"' ........... '_ !.'. i' :i;: -:.-i ..: . . ..... . ...... _! i ~ ' ~ : ' ' ~ .... i , . . · . ........................ ~ ................. --~ -,!': ~, ~!~~ !~ =--= : ...... . . : ~ ...... fil ~11~1'I ....................... ' --= ~ -----~ ........... ' ' - ............ ,,,, i i i ' i ' i i : ' ' , · , ~.~ . , ,~ , _ :, , , , : ~ ........... .~rm ....... ~ :-: '. -- :-::: -:-..! .... ::::-: ..... ~.-!-:-: ........... ;, i - ...... L±.:...:.-:'::"-.-::)~, [ r~ _ [ ; · . ' ' ~; : , ! i : ! i I i ! ~ i : :, i, i ! i I I ~ =.._, ..... ~ ..... ~ ;_ ~- . '-'~'~ · --F... ,,i,,~.~ ...... ~-, .... 1 .... +--,-_-~-~-~:-'-,- ~-- ~ ~.. i l i~ -i ~i' -;-=-~-' ~ ~'~ -~--~-~'; I- ...... ~'-~ '' , _ _ ,[, , , , , , , [ . : ] . [ l ~ J , [ i I i I i --- ~,- ..... ,- ....... ~ , ~ i ~ ~ i i '- '. ! :. ! i j J ~ I ! j t ! i J j j i i i i f i J i .................................... ~ ~ : , =. ' ' . i' i C;~ ....... -- ~ ', : ' : ' ' , ' , ', i ' i i, ;, ' ' ' !" ' ~ ~ ; .... ' , , , ,,~,, . ~ : ....... i i i !, .:~L..L ....... .--_ i . ~ '- i ~ i ~__ i ! ! : ! i ~ II i I ! '. i i :..... ' ......... Cli"II~IT" .... --:--'-----t ---t-j-i; :--'+--~-+ ..... ! '~ 't--T"--T-~-.~- ~'-;~--;-~--~-~-iii!' ;, ~ . ~:~ . i:._.' --~.,.,..? .... .,__+..?...._ . .=: ~? .... ~:,~ ,. ...... ~ ; , ~ i , ' i " ,i i i i ; i ~ ~ ~'" i ..... : ....... --:-Z.._Z, ~ '~ ~ ,.--.-L-L--. = ! I i i i i : :.: i ~ i i , ....... ~ ~ ~ ~ ; i i : ~ :, i---~+- ~:._-:---~ ........... -:-.~ --'~-,---=..-.-,-~-4-. ~-i ~- ~" ~' ~ ~ .I ::: ::. .=_+_~_._L_i_~: ~,.~ i L--~--~. -~-~.~ -~-~ ..... ~.-.~-~- ......... - ..... =-~ , ~ , ~--;--~T"--'"~'--' .... . . ' i i~ ,t i i i i J", ' j i : i ' i i i ~ ,, , , ..... · ' ! ~ : ' ' ? :~ ~i~ _~i i ~ ' ' ~ ' ' ' · ,= ~ .......... ~: ~- -~-S~ --~-~ · · ' " ' : ' ii , ' : i ~ i' i ..... '!ii . 'I LI% I Ik~ ~' ~ Ii& Ulll i i i : ~,~' ' : "; ' : :" : i } i!'~--~i :_ : ' : ' --- __._ ·' ~-~'"':- ~.-~' ' "-':~- ~STE '~-=~----~--~'--~ ................... ~: ~ , i ', ~ ! , i , , : i , ~ i ~ i ,, , .................... -,~-..~-.--t ................. i i ;--'; i ~ ~ ~ ~ i :..._~=,-' : ; --- . ............. ,-- =.: ..... ! ~ ' ~-~ , ; ~ .~-~.. ~ ! :: ~: i ~-~_ ...~ ..... ;..: ............. -,-~-.~--.~. · .: :'L~ ',', :¢~_ ¢ -'--~: ', .. ~, '': ~ _:.: ;,"~--~-~- .~;,~' ~T-T',~i' ' ~ ...... ~"-"~" ~-' ' ! ' -'. ...................... -~-~ ......... ~--;- :- .... ~ :---i-;-f.-;--~ ........ -=---~-.-:--.---,-- :---;- "-- ..,....~ ..... '. L .... --;. ..... , '~---: ~ ~ i !--"---~""~ ?-,----" .L . : ,.. ~--~ ~ . . · · · ' · · ' i ~ .... , : . ' - ; ' :~ : i-~i : ~ .--..4-_,..~_ , ;. ; . '. ', _ ~ ' . : ~ , ~_ ._;_-~,-.- ........... ...= .... : ! .......... : . . : = , , ii .... ...... i i : : ~ ' ! ....... '~ : '' "-'~'"'"---", · . . : = > ~ =:--- ' ~ .--~ ~ : t ' ' ,:'--.~i ..... '~:-'T"'J' ....... ........ ~ ..... ._ .;= .............. ~ , : :---:-- : .. ~._:.._: ..... :._i._: ...... :.~_ '_,:. i , .......... . ........ _ ......... ~ .... :. _:-- :::--~- · .................... I .... :-..-T .............. ~ ~-"- .,. _.:... ~? ~_..~ .... ::: .......... ,;.,._; . ~:-T--"-'-:::: .. .' ':::':: . ~ :- ,: ..... _::--.-~ ~__ . ...... F , . : '. ........ ~ . ~ ~._~ .... ~ ~.: ~ .................................................. :-~ ....... L": :.'::':::: ::':':-~:':S:::': .+: ............ ~ .............~. : .~. ! ' ............. ~ ............ : ........ ~ ...................... ! .............. i i" .:P.RUBH~:~:B~r~N~:~T~t~L~PE~.:~RS~¥.:~.-:!~:~.:;.:~.:!:..:~.:::.~:::: .... i ..... ~ ..... i . ~. :. l'-:-: :':-::: l'-:-h~ ~-t-:'L~R:::-:':-:~--.:.:-::'--:'::':-: k:: ::: =-:"t.::-"'::'~ :::I::.'-:: ~:':---:.'?:: :' .... ;. ;[. ::. . :.:. ~:':::: :-_'::Ui~_:.':":'::'.-.'.-_.:~i'_-:-:;._-::~_:-_~::::'--_t.:::: :.--:-' ":. ~;~:.: :_ ::'::.--:.'~.': :.: t i ............ , ............... ~ra~ .......... f ............... ~- ~ ............... 1 ............... . ........ - ' .... i ....... ; ........... l ............. i ....................... i ...... , .. ; .... ; ... { .... ~ ....... ~ .................. ~ .................................................................... -... ! ~ ........... ~ ..... i ........ ~---: ............. f ............... t ............................. ~ ......... ~ ..... : · ! ' ' ' I ........ ~ ..... ~'"', .... ,r .................. f .................. i ....................... ' ....... ' .......... ]- ........ i · ':::i':' :... -: ::'~ '.i ::::::::::::::::::::: ::::::~--~-:::':;:::T: .... ::::::::::::::::::::::::::::~::'~:-!'----:.: ........ f ................. -f. .......... ,~ ................ 4--- ................... ~ ........ ! ......... -I ........ ~ ..... ' -- ~ '" ! ' ' !~: ? .... ! ................ 'IT'"~ ........... ~ .............. 't- ........ 1, ...... ~ ...... ! ..... ~ ........ ,I ...... ' ...... = ..... -":' f -i- / · -I ....... i ......... i ................ t ................. ! ............. I .... i ...... ~t .... ' i ' ' i'..:.. :l' i .... :"' ::": "i': ' : " "::":':':; 'I: :":":'" :.:..~:::-..~:.~--:::...:~.--.~.~--~--::-.1.~;.:.::..:::::--:~::.I.:..:.~:.::~:~.:.:.~.:.::...t ¥:..-:::: _ _.-. ~ .... L ...... ' . ! .... ! -N--~." '- -- '" ................. ~ ..... I ................... --!-", ........... ? ............ i- ...... ~ ......... T/"'- ...... , ~ ..." ! :'::: :'.: :%~ :.:: .:.:-: I':".'-.':-':':::::-'-:'--I:----:.~:.'-!--.::--':.--:--:----'--~- -'---~:-.'-:-'----.:-':-~;---::..---::------::~:----.'::; . ,,, ~ , , , -.-'-: ,'3;: ..... t .............. ,i'rm~ ............. ~' ............. ! .......... 'T' .............. .,' ........ ~ !:":': ...... - .... "----'7.--- ' ' .... · . .,'{'.-. .... t ...... : ............ I. .............. -I--- ............... i .............. i ..~'4-' .... ' .... ~ : ~' ~; ' ":: :/i :': :-. :.: .: :.:'I: :":' ..-::-b.':':.L::":::-.------:I'-.-:---: :..-------~:-:.::.:-~::;::4' :"::--: ::::-::: ~...-":';.'::::.I::::-'-'---' ~ · , : ...... /-t ................. '.'- .............. -t- .......... 't- ..... -F .............. -r ............ ~ ............. f ........ ,' .... T: ............ ,". - ' i ........ L ............... ~- .......................... .-.i- ..... 'Jr .................. '-"'~"'--- ~ ................. ~ ..... ...... ~ ........ t ............ ~ ............. ~' ................. L: .................. :--t- ............ r" .............. ~ ..... ~. , . /.~i~"i .... I ............... I ......... ~ ........ ' ....... ~ ................... /:: ........ ~- ....... ' ......... ; ........ --i.- . ...... ~ ........... ~ ...... ! , _~ _ _ i .......... 4- ....... ~: ....... ' . -' .... -'-: .............. ...... , ......... !: ..... '- ,_mmcl · ' "i · · .l;;.. -~ 7'-: ........ 1 ............ t ............................... ,'"-'t ............. 'i ................ [ ....... __i.~.m ....... ' .... '~ . . ,~. .! : ~ ........... ,, ........ ____. ~ ........... :.. .............................. /._ l' ............... i ............... i .... - i.. ::-: [ ..... : ~ .... :...'~ ...... i/i. ..... -! ..... ~ ......... ~ ................ ! .... : ........... ~ .............. -i ...... /:._".:_;~_;;;LL ...... ~ .... : ............ ~_ ..... ' ~ r ':',..' . ::I~.. :: :-. :i":. :"] ::--..: :~,:----:~ :---:;:'r:': '..' '--;:::.--.:.I-~::.--;.:::::;:'~:;~r~-::::.: : ::'-':'-- ~': ---' :':- :-:: :' t;'::-s- :- ' ~ ' ~ '.~"~ ..... ~ ........ ~ .............. '/~ ............ t ::~ ............ ; ................ I .............. ~ ..... ,:§~i,.]o ~ m ~ ~o ~ .... ~o. , ......... ~ .... ~o:.., ....... ~o~ ............ ~m_.~ ............. t ..... ~-.t ..... · ~ ' ~ ~ '- i ..... * ......... : ............ ~ .............. * ............ t ............. t --t- ...... T ...... ,,'~ ~i~.'~ ....... :'- ._J ..... ,_nRTFT.. -I .... ~ '..' ! ........ ! ............ f .............. l ....... A7T_t~I_JTH- .... i' ~ ........ - ~ ~ -.! ~ ---- .:! ..... t ...... ~ ....... i ......... i .............. i' ................. t .............. ~: ....... t ........... i ........ t ........... i ..... ~:] :~ ~!,.,., , ~ ....... ~ ................ , ...... ~ ..................................... . ................ , .................. --~-i ........... -,- ........... · ' ' t ,' ..... i ,""~ .,.,. ,.,,,,. , , ;. : ..... { ............... ! · -~'"' . ...... ! __L_I -I~ISSEhBt[F$;: ":'! ':;"::-::":~ ": ":'!'-:-":":"l':'i: ':'-:!:'::'~"'LL! .' I':': !:",:: L. ' · . ' ......... t.- ............. ~- ........ ~, ................................. ~ ........... ,~ ........... ; ..... I : . FI~ .6;17;~DltN~DRlI~ -,. i .............. i .................... t ..... ! .- i .... ~ .- ' i~,- ~,,r~.~. [~el:,,. R.SSt"~eL'r ' ' ~ ....... ~ :'. -" I ':; ..... ' ! ':: - ': :':': I ::-:-: ' : :~:.: - '::: - ' :.: · ~ ' C]-- R .'~,~ ~' n~tr~' m~s:"~.~ ~, .... ' ' L -~L ...... ! ' ' .....................| , ... ~ ' I I ... i... ,... ~.." . . , . ..... ~ ..... "'i '..; ~ ..... ~.- ......... ~ ...... ; ......... i. ............ ~, ........ ~ ....... ~ ..... .... ] ~ .... ; ............... i. ... ~ ..... i ' '"~ 'i :':-7! ~ ~ ..... Ii Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. 'Op~ra-tor, W~i 1' Name 'and Nu~be-r ' - Reports and Materials to be received by: ~"--~ Date Required Date Received Remarks - . , .,. Comp l etio n Rapore Yes Well History. Yes : ~ , Core ~scription Registered Su~ey Plat?/ Inclination 'Su~ey Drill Stm Test Pr~u~ion T~t Re~s ~" ., . ,, ~ ~-~- ~ :~'.K A~cnorage. ~,las~a 5'~51'3 Telephone S97 o77 5637 May 10, 1982 Reference: ARCO MAGNETIC TAPES & LISTS D.S.14-28/ 3/19/82 D.S.11-7--~2/26/82 D.S.13-17~/4/13/82 ~..S.14-.9Bu~ 4/10/82 D.S.15-14j 12/25/82 DS..14-9BV 4/21/82 Tape # ECC 1252 Tape' # ECC 1238 Tape # ECC 1243 Tape # ECC 1275 Tape # ECC 1192 Tape # ECC 1283 Please sign and return the attached copy as receipt of data. Mary Fo Kellis North.Engineering Transmittal # 148 DISTRIBUTION NORTH GEOLOGY. R&D DRILLING PHILLIPS SOHIO' MARATHON CHEVRON D&M A,...,.,k-::t'~- Oil & Gas Coos, Com,)Js~io!-~ GEOLOGY Anohor~.g~ STATE'OF .ALASKA Post Office Box 360 Anchorage." -ka $9510 Telephone 9b. 277 5637 April 29, 1982 Reference: ARCO CASED HOLE FINALS D.S.14-9B~4 /10/82 .... D~'S-~2-20 '-" 4/12/82 D.S.13-17 ~/4/7/82 D.S.13-17'l 4/13/82 D.S.2-20 ~ 4/19/82 D.S.7-11C'''' 3/31/82 DS..15-3 ~ 4/2/82 D.S.15-3 / 4/2/82 D.S.7-14~' 4/1/82 D.S.14-28"'~3/28/82 D.S.17-10/ 3/15/82 D.S.14-29--~'3/11/82 D.S.13-23A'~/3/17/82 D.S.14-29 J3/11/82 D.S.14-29 ~* 3/11/82 D.S.11-2Y .4/10/82 D.S 2-13"/~4/19/S2 .. CNL Run 1 2" & 5" ACBL/VDL/GR Run'l 5" ACBL/VDL/GR Run 1 5" CNL Run 1 5" CNL Run 1 5" CNL Run 1 5" ACBL/VDL/GR Run 2 5" CNL Run 1 5" CNL Run 1 5" CNL Run 1 5" Perf Record Run 1 5" Pipe Analysis Log Run 1 5" CNL Run 2 5" CNL Run 1 5" CBL/VD Tun 1 5" Collar & Perf 'Log Run 5 5" Collar & Perf Log Run 1 5" se sign and return the attached copy as receipt of data. Mary Kellis N~r%h Engineering DISTRIBUTION TransmitO~I ff 134 MARATHON D&M GEOLOGY Bas Cons. ARCO Alaska, Inc. Post Office Box 350 Anchorage. , ~ka 99510 Telephone 9b. 277 5637 April 29, 1982 Reference: ARCO OPEN HOLE FINALS D.S.14-9B 4/10/82 D.S.14-9B 4/10/82 D.S. 14-9B 4/10/82 D.'S. 14-9B 4/10/82 D.S.14-9B 4/11/82 comP~Densilog/GR Comp Densi/Neutron/GR BHC Acoustilog DIFL Prolog Run 1 2" & 5" Run 1 2" & 5" Run 1 2" & 5" Run 1 2" & 5" Run - 5" ~~Please sign and return the attached copy as receipt of data. · Mary F. Kellis North Engineering Transnittal # 132 DISTRIBUTION GEOLOGY 0ii & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Apr il 30, 1982 Mr...C.. V. Chatterton State of Alaska Alaska 0il & Gas Conservation Commission 3001Rorcupine Drive Anchorage, Alaska 99501 Subject: State Reports Dear Mr. Chatterton: Enclosed are Well Completion Reports for the following drill sites: 11-6 11-7 14-29 15-2 1A-15 (Revised) Also enclosed are monthly reports for March on these drill sites: 2-19 15-4 2-20 Eileen #1 13-17 West Sak 24 13-23A 1A-16A (Sidetrack) ~i4~9B? IE-9 14-28 Oliktok Pt. #1 !4-30 West Sak 25 15-3 We are also including plug and abandonment subsequent sundry reports on Eileen #1 and 1A-16. The reports on Eileen #1, Oliktok Pt. #1, and the two West Sak Wells are of a confidential nature. We would appreciate it iff you could store information concerning these wells in a secure area. Sincerely, P. A. VanDusen District Drilling Engineer RE£EIVE APR o 982 Oil & Gas Cons. CommissW. Anchora§9 PAV/Jg: pb STATE OF ALASKA '~ -' ALASKA'~(' _ AND GAS CONSERVATION Cd~.'" MISSION MONTHLY REPORT OF DRILLI# AND WORKOVER OPEal'IO#S · Drilling well [] Workover operation [] 2. Name of operator 7. Permit No. ARCO Alaska, Inc, 82-34 3. Address 8. APl Number P, 0, Box 360, Anchorage, AK 99510 50-029-20534-02 4. Location of Well at surface 1990'S and 895'W of NE cr Sec. 9, TiON, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 71_' RKR ADL 28314 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No, 14-9B 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay Oil Pool For the Month of March ,1982 12, Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig on 03/Z4/82. Tested 9-5/8" casing to 1000 psi - ok. Perforated 7823'-7825' with 4 spf. Pumped 400 sx Class G cement. Milled window (7726'-7771'). See Drilling Hi story. 13. Casing or liner run and quantities of cement, results of pressure tests N/A. 14. Coring resume and brief description N/A. 15. Logs run and depth where run CBL (8050'-6000'). 71 6. DST data, perforating data, shows of H2S, miscellaneous data N/A. RECEi'VED APR 3 0 1982 0il & Gas Cons. Commiss[or~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED TITLE Area Drilling Engineer DATE NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form i0-404 GRU3/B6/7 Submit in duplicate Rev. 7-1-80 DS 14-9B Drilling History Accepted rig @ 1200 hrs, 03/24/82. ND tree. NU BOPE & tested to 5000 psi - ok. Circ out 180 bbl (+) diesel. Circ & cond mud. Tstd 9-5/8" csg to 1000 psi - ok. Perfd 7823'-7825' w/4 spf. Pumped 20 bbl water followed by 400 sx Class G cmt. Drld cmt to retainer @ 7805'. Drld retainer & cmt to 7830'. Cleaned out to 8050'. Ran CBL f/8050'-6000'. Cut 9-5/8" csg @ 7726' & milled to 7754'. Contd milling to 7771'. Pumped 150 sx Class G cmt as of 03/31/82. JG:hrl 04/15/82 3 0 J982 A.~ska Oil & Gas Cons Commission /:mchorag~. GRU3/B8 ,ARCO Alaska, Inc. Post Office B '~60 Anchorage. A,,._ka 99510 Telephone 907 277 5637 April 22, 1982 Reference: ARCO DIRECTIONAL DATA D.S.2-20 3/22/82 to 4/8/82 Single-Shot -Job Noo 0482-008 D.'S"14-9B 4/10/82 Single-~hot Job No. A0382D0305 D.$.2-19 3/18/82 Single-Shot Job No. A0282D0288 Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 121 'DISTRIBUTION NORTH GEOLOGY R&D DRILLING PHILLIPS SOHIO' MARATHON CHEVRON GETTY D&M '" '" ..... ' ......... ''" GEOLOGY STATE OF ALASKA ARCO Alaska. '-nc. is a sul=~ichary of Allants~.RlchfieldCo;npany ALASKA OIL AND GAS CONSERVATION COMMISSION Thru: C_hat.~~~~rton Cha~ma~- Lonnie C. Smith Commissioner Harold R. Hawkins Petroleum Inspector March 31, 1982 108/A Witness BOPE Test ARCO Redrill DS 14-9B Sec. 16, T10N, R14E, UM. Permit No. 82-34 March 24, 1982 - I left Anchorage at 7:25 a.m. by Alaska Airlines ~b' 'prUdh0~'"' arriving at 9:05 a.m. When I arrived in Prudhoe I drove to Sohio's F pad to check out a BOPE test that was coming up, the Brinkerhoff Rig No. 1 was just being moved over the well. I went back to DS 14-9B where Parker Drilling's Rig 191 was nippling up for a BOPE test. The BOPE test started at 11:45 p.m. Mar~..h 25, 198~2 - I witnessed the BOPE test on DS 14-9B. There ~ere three equipment failures and no well sign installed. I filled out an A.O.G.C.C. report which is attached. In summary, I witnessed the BOPE test on ARCO's DS 14-9B redrill. When the BOPE tests were over the tests were satisfactory, with the exception of the well sign. (See remarks on A.O.G.C.C. report. ) Attachment: March 26, 1982 Virgil Holbrook called, the well sign was installed. O&G H4 4/80 , ... {" s'r^,rJ:: OF' AJ,ASKA ( ALASKA OIL & GAS COrJSln~VI\T raN COHl-lISSION B.O.P.E. Insvcction Report Da te =i /.::( ç / r ;:.:' / / Inspector Well ..- -':. .......- -. - .. Operator --d h £/J Representative J../.II/[:"- ~t.-::ll::ll( - Well /:) 'L'5. J'I - '7 R Permi t # ý"  ,- -; Jof ".. . Location: See J' Tíl"'¡)RJl/~ ¡)11 9);/ Casing Set @ t/:;¡.)rr ft. Drilling Contractor IY!~.""'", ~ig ø/(')) Re;resentativl"r//.';',", .1.,' ..::",.'" " -I~='= ,~~~~~~..=..__.. - toca tion, General ("f" . i\CCUHU1.J\TOR SYSTI::r.l ~lell Sign OX ,.,,., /"JlflUPb J/~b /11''- IIFUll Charge Pressure .:2 p) () })sig , , General Housekeeping, t :.( Prestiure After Closu rc I.:.. )..'" psig Reserve pit r'/f 200 psig Above Prechargl~ Attc1ined.:..=-min /,1',- see Rig ,J" ,.( Full Charge Pressure Attained: ~ min ~,~.... see: ~ N2 J9«o"'J 'r ~ ."!;J r. ::- f') ~.. ò. psig J , , t-J . / ' Control s: Mas ter IJ /(' ~. , Remott! ,þ,(.í Blinds switch cover ,1"-:" . ." - -. -I"".:-=-= -. ..-- _--_I_.-".=-'=::'-'.'_'--='_-~:-__'. .---':1"":1'='=. - _. .-- BOPE Stack . Test Pressure Kellv and Floor S~~etv Valves Annular Preventer ,. '\ .w :",' Upper Kelly Test Pressure rd 1 c., Pipe Rams I)'", ð , I Lower Kelly: 'lies t' Pres sure tt{"" ",1 . ~ ,..., Blind Rams. ~".... r:J Ball Type Test Pressure .r,~ ,i ¿- Choke Line Valves ' ~"IJ Þ Ins ide BOP Tes t Pres sure (/ ~~1 ) H.C.R. Valve .f-ð/J.~ Choke fo1ùnifold Test Pressure ~~.,.J ,.;J Kill Line Valves T¡ð" (> I No. Valves /j ,V' Check Valve Jrn'n n No. flanges ;?6 1\dj ustable Chokes 'iu) " ':' nydrauically operc1 tc~d choke (111"" 1'est Results: Failures'" . ~-1.f -- -- Te-st'::Ti:;~'=--::'=:==-h~""s~--'" ;~ 0 ~'''I'I/ Repair or Replacement of failed equipment to be made within~.1 days and Inspector/Commission office notified. Remarks: epl'J.=~ pJPf ¡:¡¡f.n~ "/~/l/.':"'" A','" t:l.1~~~..~1! ~:"/f""" I' ~":", ':''':' ...:\,(, I . ( .I 'þ .~. .' ,. Ilr£'-' . '.Þ"'," 6J Aj' .1 J:,J!. r';p¡'fj ~ ',':¡.". . ..."', . ¡; If A Y I. f) I.' ".1. """ I'Jf.," v 1/ J'tJL: :. ".,.I.~I:' .-' : ¡Af.t i. ,," ~.~ ; .-tAl'." W' .,~ 7/-' ~/,,"3;,',; /.: '. J:' tJ Ii R T I ,., r \ )jt 1''7 of rF I) . il,;~ ;~ J: ð r ð C A;' I -4 /) t: r r 11.' JI,.. A.J 'j / ¡;'J.tI ~ ,I..'rt' ""11 i) f{) c.'." ,,,1 A ,., 7'E.JT5 Jvt."':/I'E ~ATlrr~t.'7"R/ø ~/R '/"'~ YIR¡;,L 1/61..811ðDK I'A¡f¡(£H 19/ ¡;"AI.I.£P 0' Distribution 4/ç J"J. S JG~ /6 I PJrAJ.J..t:,O, or ig." - AO&GCC / cc - Operator ~ ~.~ /11 cc - Supervisor Inspector - - '..f?""& 4'., .<'/... ;! ~~, ../ ~larch 19, 1982 ~r. Mark ~,la Jor Area DrillinK Engineer ARCO Alaska, Inc. P. O, Box 360 Anchorage, Alaska 99510 Prudhoe Bay Unit DS 14-9B ARCO Alaeka, Inc. Penni t t~o. $2-34 Sur. Loc. 1990'S, $9§'W of NE er Sec 9, T10N, R14E, ~. Botto~ole Loc: 2659~S, 239'W of NE cr Sec I~, T10N, Rl~, U~. Dear ~.r. ~iajor: Enclosed is the approved application for permit to drill the above re fex*enced we I 1. Well samples and a ~d log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all log's for copying except experimental log's, velocity ~rve:ys and dtpmeter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or ~igration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Depart~,ent of' Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article ? and the relictions promulgated thereunder (Title 15, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commmncing operations you maFbe contacted by a representative of the Department of Environmental Conservation. Mr. ~la rk ~a ] o r Prudhoe Bay Unit DS 14-9B -2- ~,!arch 19, 1982 To aid us in scheduling field work. we would appreciate your notifying this office within 48 hours after the well is spudded. We would also like,to be notified so that a representative of the Cc~ission may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. Very truly yours, C. V. Chatterton Chairman o f BY O~a O,~ TI.tE. CO~M~SS!ON Alaska Oil and tias ~onse~va~on c~mtssion Eno 1 o sure ecz ,Department of Fish · Game, Habitat Section w/o enel. Department of Environmental Conservation w/o encl. ~C~be ARCO Alaska, Inc. Post Office B,. 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 11, 1982 Mr. C. V. Chatterton Commi ssioner State of Alaska Alaska Oil & Gas Conservation Commi ssion 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 14-9B Dear Mr. Chatterton: Enclosed are: 1. The application for Permit to Drill 2. The $100.00 application fee. DS 14-9B. 3. The horizontal/vertical well-bore cross-section. 4. A sketch and description of the BOP equipment and testing procedure. 5. Sundry Notice to abandon DS 14-9A. We anticipate that well operations will begin approximately March 24, 1982. Your early review of this application would be appreciated. Gas Cons. Oommissio~ Anc~orag~ Sincerely, ~. ^. Major Area Drilling Engineer MAM:SLB/hrl Enclosures BAR2/A26 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ALASKA L AND GAS CONSERVATION C ,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [] lb. Type of well EXPLORATORY [] SERVICE [] STRATIGRAPHIC [] REDRILL [~ DEVELOPMENT OIL [] SINGLE ZONE [] DEEPEN [] DEVELOPMENT GAS [] MULTIPLE ZONE [] 2. Name of operator ARCO Alaska, Inc. 3. Address ~. 0. Box 360, Anchorage, AK 99510 4. Location of well at surface 9. Unit or lease name 1990' S, 895' W of NE cr. Sec. 9, T10N, R14E, UM Prudhoe Bay At top of proposed producing interval 10. Well number 2600' S, 172' W of NE cr. Sec. 16, T10N, R14E, UM 14-9B At total depth 11. Field and pool 2659' S, 239' W of NE cr. Sec. 16, T10N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no. Prudhoe Bay 0i 1 Pool 71' RKBIADL 28314 12. Bond information (see ~20 AAC 25.025) I-eclerai Insurance Co. Type Statewide surety and/or number 8088-26-27 Amount $500,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed @ 6 Mi. NW of Deadhorse miles 2600' feet we. 1520 feet ,, 16. Proposed depth (MD & TVD) 17, Number of acres in lease 18. ApprOximate spud date 11842' MD, 5988' TVD feet 2560 03/24/82 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures 3707 psig@ .. Surface KICK OFF POINT +__7800 feet. MAXIMUM HOLE ANGLES5 oI (see 20 AAC 25.035 (c) (2) 4~88 psig@9 !87 ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT ' Hole Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) 8-1/2 7" 29# L-80 Butt 454~' 7500 1~6100 11842 1:9187 500 sx (]la_~ G cmmmnf- l i I I I ~ I 22. Describe proposed program: Operator plans to section mill a +._40' window at +7800' and sidetrack to a new target lo'ca- tion. Logs will be ran in the open hole. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed and tested to 5000 psi. The BOP equipment will be pressure tested each week and' operationally tested each trip. A string of 3-1/2", 9.2#, N-80 tubing, packer, and s. ubsur- face safety valve will be ran. A separate Sundry Not ice will b~svb~m~mt~;~dr~when the well is ~to be perforated.XICI, ICI¥1CU MAR i 7 1982 A!~sl~ 0il & Gas Cons, Commission ~ch0raga 23. I hereby certifv that the foregoing is true and correct to the best of my knowledge SIGNED TITLE Area Dri 11 lng Engineer DATE The space below for Commission use CONDITIONS OF APPROVAL Samples required Mud Icg required Directional Survey required APl number []YES ~[NO []YES [~O ~[_YES []NO 50--0 ?.~- ,.~ O3"~ Permit number Approval date ~'Z,-_..,~F ~_. 0j~/19/,82~ J [ SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY /i~"~¢¢//~ ,COMMISSIONER DATE March 19,1982 N.../ - ~ · / by order of the Commission Form 10401 Rev. 7-1-80 Submit in triplicate ) PiPE RAMS _) [ PREVE~TER } BLIND RAMS .RECEIVED MAR 1 ? 1982 Alaska 0il & Gas Cons. Commission Anchorage 13-5/8" BOP STACK DIAGRAM Accumulator Capacity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that akccumulator pressure is 3000 psi with 1500 psi downstream of the regulator. 3. Observe time, then close all units simultane- ously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test 1. Fill BOP stack and manifold with a non-freezing ,liquid. 2. Check that all hold down screws are fully re.tracted, Mark running joint with predeter- mined plug seating depth. Run test plug on drill pipe and seat in wellhead. Run in lock down screws. 3. Close annular preventer and chokes and bypass valves on manifold. 4. In each of the following tests, first hold a 250 psi low pressure test for a minimum of 3. minutes, then test at the high pressure. 5. Increase presure to 3000 psi and hold for a minimum of 3 minutes. Bleed pressure to zero. 6. Open annular preventer and close top set of pipe rams. Increase pressure to 5000 psi and hold for at least 3 minutes. Bleed pres- sure to zero. 7. Close valves directly upstream of chokes and open chokes. Increase pressure to 5000 psi & hold for at least 3 minutes. Bleed pressure to zero. 8. Open top set of pipe rams then close bottom set of pipe rams. Increase pressure to 5000 psi below the bottom set of pipe rams and hold for at least 3 minutes. . 9. Test remaining untested manifold valves (if any} with 5000 psi upstream of valve and zero pressure downstream. 10. Bleed pressure to ze6o. Open bottom set of pipe rams. 11. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minutes. 12. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are full of non-freezing liquid and all valves are set in drilling position. 13. Test standpipe valves to 5000 psi. 14. Test Kelly cocks and inside BOP to 5000 psi with Koomey pump. 15. Check operation of Degasser. 16. Record test information on blowout preventer test form. Sign and send to Drilling Super- visor. 17. Perform complete BOPE test once a week and. functionally operate BOPE daily. Rev. 5/13/81 CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITeM APPROVE DATE (1) .Fee ~~' 5-/~x / (2) hoc ~&---- 3-Z?'~~ ~ thru 8) 1. Is the permit fee attached .......................................... 2. Is well to be located in a defined pool ............................ . 3. Is well located proper distance from property line ................ 4. Is well located proper distance from other wells .................. 5. Is sufficient .undedicated acreage available in this pool 6. Is well to be deviated and is well bore plat included ...'''''''''' 7. Is operator the only"affected party ....................... 8. Can permit be approved before ten-day wait ............... (3) Admin ?~.~ ~"I~"~'~'~ 9. thru 11) 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. (4) .CasE J~ 3-19- (12 thru 20) YES NO REMARKS (5) BOPE [~ .~"17-~2. 21. (21 thru 24) 22. 23. 24. (6) Add: .9 ,3.-I?-gL 25. Does operator have a bond in force ................................. Is a conservation order needed ..................................... Is administrative approval needed .................................. Is conductor string provided .............. Is enough cement used to circulate'~n ~~; a~ ~~e [~.[[[ i[ Will cement tie in surface and intermediate or production strings .. Will cement cover all known productive horizons ...................... Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst· Is this well to be kicked off from an existing wellbore ............. Is Old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... Is a diverter system required ....................................... ~ Are necessary diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ~Ooo psig .. _~ Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements · Additional Remarks: Geology: Engineering HWK _~_ LCS ,.. BEW , r INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE ,,, Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX~ No 'special'effort has been made to chronologically organize this category of information. .o LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO ALASKA, INC. Well D.S. 14-9B (CORRECTED) Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 4-10-82 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale RFOC ......Resist,..iv,,$ty Focused ....... D.!FL .. .2 - 2000 RILM " Medium " .2 - 2000 ,.RI.LD " . Deep " .2 - 2000 ..... SP Spo.ntanePus P,,otential ,DIFL/BHC AL 0-1507 !50-300 GR1 G.amma Ray 1 ",, " ...... 0-100,.,10.07200 AC Acoustic BHC/AL 150 - 50 GR Gamma Ray ....... CN/CDL 0-100, !00-200 CAL Caliper ................... " .,6 - 16 CORR Correction " -.5 - .5 DEN Den,sity " 2 - 3 ....... _DENP Density, Porosity ,, CN ,,. 60 - 0 CN Compensated Neutron .... " " ,, I ECElllr. n ,,, , ,, .......... ""'" ,~,~0~ Alaska Oil &~a; ~.,~,,. ., .... · tn,,,~:._"_''°' uorllrni, q.~.._ ECC NUMi~ER 1275.00 -- ARco ALASKA INC. __.. LI,8, I~-9B 1 S IG 0 ARCO ALASKA INC, D,S, PAGE FT I N_ _AP_I · G/q ................. ~ .................. API 5 8 0 275 2790 281 5 8 0 5 8 0 5 8 2850. 5 7 2870. 5.7 2890. 5.7 2910 2930. 5.7 0.0 2 3050. 5.8 0 0 2 PAGE 2 ARCO ALASKA INC. D.S. lq-93 GR1 IS RUN WITH DIFL .__DEPTH .... FT ~.~k .....GAl .............. DEN ........ CDRg ........... C_~ .......... ~ .......GR ........ AE._~_~___~. RI!D DENP IN AP1 G/C ~ A~_I 319 5 8 0 0 2 321( 5 7 0 3230 5 8 0 0 2 3250. 5 8 0 0 2 3270. 5.7 3390. 5.7 3930. 5.7 34.50. 5.7 0.0~, ~2 ~1 4, G.~ o.o 3~.~ 0.o o.o 34.70. 5.8 ~0 ~2 0,1 ~,A n_n ~~ ~ ~:~:~:~: ~ ::: ;~:~;~:~ : :~::~: :~:~ 3510. 5.8 0.0 2~2 I.A 3530. 5.8 0.0 ~ ~.1 5q.~ n.n 39.~ n.n n_n n n n_ n zn_ 5550. 5.8 0.0 2~ ~~ qa. ~ ~o 29.~ o. 3570, ,7 0.0 2.2 ~1 qg.q 0.0 28.5 3590. 5.~ ............... 0.0 2.2 0.1 ~9.0 0.0 33.5 0.0 3610. 5.~ 0.0 2~2 0.1 50.~ 0.0 25.1 ~ ....... .;~ .... : ...... ,.~.~ ~; ........ ~ ......... .~:;~. .... 3670 5 8 0 0 2 PAGE ARCO ALASKA INC. GR1 IS RUI',i WITH ?~':~'~":':"'~' DEPTH: __G.!~i_ .......... DEN ......... C. ORI~ ............. __CN .....~ ........... G_R_ .....A.C___RI:'OC ._R !LM ~'1 O O~NP F T I N A PI ....... GZ.C_ .... ~ Ae I 385( 3870° 5 8 3890, 5.7 3910, 5.8 3930 5 7 ,~ ~170. 5.7 0.0 2.3 0.1 PAGE ARCO ALASKA INC. D.S. I~-~G GR1 IS RU!", WITH DIFL CORk ........CN_ ....... __SP ............. GR_ ................ AC ...... IiF___OE ......... _RI_L~ .... RI.LO- D~NP .......................... ~ ___/~P_I 0 5 7 0 ~250, 5 {+270 5 7 0 0 2 v350 ~370 v{+lO, 5,7 vq30, 5 PAGE 5 ARCO ALASKA INCo D,S, 1~-9b 6,90 5 7 0 5 7 0 ~870. 5,7 ~890, 5.7 ~930, 5.7 ~95o. 5.8 o.~ 2~ ~41 sg.A o.o 35.0 o.o o.o o.o n.o. ~990. 5.7 ~0.0 g~2 o,1 qa. ~" ~.0 3~ 5olo. 5.7 o.o a,1 o~ ~I~5~ O~ $~ :::: ::~ '~ ~::~ :;~:: :: "~: ~ ::::::~ :;,:~ ::~: :::i::: :I ::': :::;~ '~ ~:~:: :'~:: ::; : :~';~::~:~:: ::~:~ ::~ ::~; 5070. 5.8 0.0 2.,2 0~ ~Z~5 0.0 ~2.~ 5090. 5.8 ~eO 2.2 O.i ~ ~ 5 .... ~ ~ ~Z~i_- ~170, 5.7 0.0 2 PAGE ARCO ALAS~qA INC. D.S. 1~-9[~ GR1 IS RU~,J WITH DIFL ~:: F T I N A P IL ........ _G:'.I__C .................. ~__ ............AR1 ,. 5210, 5 8 0 0 2, 529( 8 0 0 2 5350 5370. 5.8 5390. 5.8 5~0. 5.7 5~30, 5.8 PAGE 7 ARCO ALASKA INC. D,S, GR! IS RU~q WITH DIFL ............. ~'?~"~ ;'O£PTH CAL' _~R--~--__D_EN ...... CQ~J~ _ __ON __s~__ GR __~__RFO£ RILM R!~.'D... DENP 5 8 0 .5710 7 0 0 2 5730 5 8 0 5770 5 7 0 0 2 5830. 5.7 0 0 2 5870. 5.7 5890, 5,7 5910. 5.7 5930. 5.7 PAGE 8 ARCO ALASKA INC. D,S. GR1 IS RUb WITH DIFL ~ FT IN -AP1 G/C 210 5 8 0 0 2 30 5 8 0 6350, 5 7 E, 370, 5 7 ~390, 5,7 &~lO, 5 6~30, 6~50. 5.7 ~0 2.2 ~~ 44..~ o.o 33.8 o.o o.o o o 6q, 70, 5.7 ~ 2.2 il.1 ~.~ ~_n 2g.~ n_n n_n n n ~ n ~n , ::~:~:~:: ?~ 6~90, ~5,7 0,0~ ~2 0~1 ~2.~ o.o 23.A 5 ~ ' ~510. .8 0.0 2.1 0.1 ~1.~ ~ 23.8 ~530, 5,8~ 0.0 ~~ 0.1 41.~ O.O 3~.~ n.n n_n 6570. 5.7 ~:0 2.i 0.1 ~2.~' O.O 12.7 65~0. 5.7 ~ ...... 2.1 ~.~.1 29.= 0.0 2~.~ GG50.~ 5.7 0.0 2.~ 0,~ 38.~ ~0~~ ~ n-o ' · ,~ ...~.;~ :;::;::: ~:: :~:~: ::;~:~ :::::::::::::::::::::::::::::::: ::~:~:" ================================== 6670. 5,7 0.0 2 1 PAGE 9 ARCO ALASKA INC. L).S, 1 N,-gL~ G850, 6870 ~890, 5.8 6~10. 5.8 ~950 5 8 ~990, 5.8 0.0 2.2 0.1 7070. 5.8 ~ O~ 2.1 0.1 ~:~"¥~ ~:....:~ ~.,~ 7110. 5.7 0.0 2.1 :~Zi5o. 5.7 o.o 2.i ~W:~::~::~:~Z~?::::~":~':~::~:::~:::7:::':T' :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::: ::: : :: :::: :::: ::::: ::::::::::: ::::::::::::::::::::::::: ::::: :::::::::::::::::::::::::: :::: ::::: :: :: Q::::::::::::::::::::::::::::::::::: ::::: :L': :12:::: :::::::::::::::::::::::::: 7170, 5.8 0.0 2 1 0 PAGE 10 ARCO ALASKA INC. O.S. GR1 IS RU~ WITH DIFL DEPTH CAL FT IN GR!. ........ _D__EN ..... C_OJ~R ........C_N ....... SP , GR _AC___~FO£ RT_LM API G/C ~ 190 10 5'-.7_ 0 2 5 8 0 58 0 0 7250 5 8 0 0 2 7270, 5 8 0 0 r290. 5,8 0 7510 5 8 0 0 2, 7330, 5.8 0.0 2, 7350, 5,7 7370, 5,7 7590, 5,8 7qlO. 5,8 7~30 5 8 7q50. 5.8 0.0 ~1 0~ ::: : :.?.::: 4 :~ ~::::~;,~:::::::: 7570. 5.8 ~ 0.0 2.2 ~.~ ~0.~ 7590~ ........... ~.9 .,..0,? 0 2.2 ,:_~::::~::~:. :::::::::::::::::::::::: ::~;~::.::::.:~:~ :::::::::::::::::::::::::::::::::::::::::::~::::~:.:::~:::::::::::::::::~:::::::::::::::~:~:~::~:::::~:?::::::::::::::::::::::::::::::::::::::::::::::::::::::::2:~:::~:::::::: 7670, 6,0 0.0 2 1 PAGE ARCO ALASKA INC. D.S. F T I N A P I G_/. C ........................... :.o_~ ................... _AP.__ 771 6 5 I 7751 6 1 ~7 4 1 7770. 9 1 58 9 2 7850. 8.2 2 2 7870. 8.8 7890. 12.0 7910. 7930. 12.2 7950.~ 9.5 63.6 2.~:~ 0.~. S~ 1~ ~~ ~8.1~ ~.1 .~.7 x.S ~O_ 7970, 11.5 8~ 7 2.2 0,1 8010. 11.7 71.5 2.~ ~0.~ ::~::: ::f~ ::::::::::::::::::::::::::::: :~::T~: ~:: ::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~:~' :::: :: ~::~:::~?:~.::::::::::::::::::::::::::::::::::::::::::::::::::::::: ..~.: 1.0.? 1 .0 86.~ ~.S 8130. 11.5 108.8 2.4 8150 10 9 88 6 8170. 1.0.9 85.6 PAGE 12 ARCO ALASr<A INC. O,S. 14-9S GR1 IS RU~! WITH DIFL DEPTH CAL GR.! ............. D.E_N ........ CORB ............... EN ............... SR ............. GR .............. A_C ....... EEOC ....... RT_LM R!i D DENP-- FT IN AP1 G/C o, 819 0 12 1 99 825t 12 7 2 8~ 12.5 8290, 12.6~92.1 833( 0 835~ 837( 8390, 8qlO 12.1 8q'50. 12.1 83.~ 2.~ 0.2 4.2.1 154.1 66.3 qB.1 ;'.3 P_R ~_g '~ ?,_ ~ 8550. ii.2 ll~ . 3 8570. 1 .9 97.6 8590. 11,~ 108,6 2~ 0.2~1~2.1 95.~ qS.~ ~.~ ~_~ , '~ .... ~:~,: ~ : ~::~'~;F?~:' :~:~:~.:?~ ~.., .. PAGE ARCO ALASKA INC. D.S. GR1 IS RU;,~ WITH DIFL DEPTH CAL GR~ .......... _D._E.N ...... _CDR~ ................. C.N ...... _SP__ ..... G_FL ........ _A~ .... REDC__~RI; D- D~NP FT IN APL__ G/C ~ . AP_L__ 2 6 113 8750 1 122 2 2 ~ ~:::::~:~ :: ::::::2::~::J:: ::~ ::::::::::::::::::::::::::::::::: 8830 107 85 8870. 10.5 8890, 10.6 8910 a93o 8950, 10.0 85.1 9050. 10,0 92.3 ~:.J:~::~2:::_,,,: ~::~:.:~. :~,,~: 9150. 10.1 82,q 9170. 10 2 61 6 2 PAGE 1.+ ARCO ALASKA INC. D.S. lq-gE~ GR1 IS RU.~ WITH DIFL DEPTH CAk ............. ~B..~ ....... ~_E~ ...... C..OP~_R_ ............ CN ........... SP .... ~R ........ AC___i~_O£_ R_I-L~ R!!D- DENP- 919 ~21 10 *+ 92 10 5 87 ~270. 10 ~ 85 6 2 929 10 3 ~8 ~.~3 - O. ~ ~ 12 ~- 8 ~ ~ ~ ~.~ ' 9310, 10,0 ~88~ 9330 9350. 10 9370. 10.1 9390. 10.0 9.+10. 10.0 9q30 10 0 ~ ....~.:.~.~.~.~.,~.~.~.&.~.~.~is~:~.~ ...... ..~.......~'¢'~":~. ~.~%~.~......~......! :....~,.......a.% ..... ~. ...... .~ ....... · ....... ~ ~ 9510. 10.1 99.~ 2.4 0~ 5~ 1~.7 83.~ ~ ~-~ ~A ' 9530. 10.1 99.7 2.9 A~ ~ 129.1 85.1 ~A. 1 P.~ ~_q g_q l~_l .... 9550. 10_,2 ~!l 2.3 0 3 1~8.6 8i~ ~a.1 ~_n o ag ~ ~. ~ 9590. 10~ 172.3 2.3 ~~ 1. '~ 1~ ' A - : 9670, 9 e 129 ~ a 2 1 3a PAGE 15 ARCO ALASKA INC. 0.S. -- DEPTH _A_C_AL ...._GBI .......... DEN ....... ~., F T I N ABI ..... G2_G ................ ~ A P I 9 1 1,9 4 2 9 8 178 9810. 9.~ 1~1.1 983t 0 159 '" 9890. 9910. 9930, 10 5 10150. 9.9 131 ~ 2.4. 10170. 10.3 151.7 PAGE 16 ARCO ALASKA INC. D.S. 1{+-9~ FT IN AP1 G/C Ii 210 10 5 1925.8 10225 10 0 227 {+ 2 1 250 9 9 218 10290, 10 i 2 5~ ~ 5 2' ~ ~ ~5 1 s>,,~ ~ ;~.~ 10330. 10.8 198 1 2 10'350. 11.0 10~70. 11.0 10390. 12.{+ 12.2 10{+~0. 13 0 10490. 12.5 ~8~ 2.2 n~l 37.A17~ 89 8 10510, 12 9 99 ~ 2~ ~ ~ ~ ' 10550. ~2.7 ~.5 2.3 0.0 3G..~. 1.7~...A ...... 85.1 10550. 13.~ 99~ ~.~ 8~.0 10590. 1~.0 102.2 ~~ 0.1 g~.~ 18g.g .9_0.._~ ........ ~ 10650. 1 .6 100.0 ~2 ~ A8 ~ ~$ ::?:? ~:::~ ~ ~::;::::~::~?: ? :~:::: ~ ~::~;:: ~?i~;:~ ;~ ~ ~::;:~;~ ~:: ~ ~ ~::~ ~t ~:~:~:: ~ ~ ~ ~ ;~:~::~ ~;;: ARCO ALASKA INC. O,$. PAGE 17 GR1 I8 RUi'~ WITH DIFL 'TH , A~,_GR1 ........ DEN ........ C_ORR_ .......... J:N ....... ~ ......... _GR- ......... ~ ..... R~._O£_.. R I LM R I ! D D£NP~ FT IN API_ .....G/q ~ AP1 ., 3 93 1 15 12 3 11~ 1 13 1 2 109 10830 13 9 109 10850. 13 6 10870. 10890. 11 q 10910. 11.1 10930 11 3 10950. 11.5 ~.~.~. 7 2.q O~ 11010, 11.8 106.1 2,3 0.1 110}0. 11.5 129~_ ~_~.3 0.1 37.1 11070. 11.6 107.8 2.~ 0.1 35.0 160.q 107.A ============================ ~P!~.~:~!.~ 11090. 11.5 112.0 2.q 0 1 ~Q~P 16 ~1 ~ 11130. 9.2 282.7 2.5 li150. 9.2 320.6 2.6 -0.0 lfi,A 1QS.~ 2D, 11170. 9.2 i00.3 2 5 PAGE 18 ARCO ALASKA INC, D.S. 14 F T I N A P I G/_{ ................................ _~. ..................... AP_I 8 80:3 2 11310. 8.6 33 3 2 11350. 11370. 8.6 11390, 8.6 llqlO. 8.6 114.$0. 8.6 114'50. 8.5 30.7 2.3 -0~ 2A.~ 12B.8 30.7 ,~2.4. 4.9 11~70. 8.5 22.3 2,2 -0.1 26.7 12~.1 22.~ ~0.3 p.7 ~=~=~ ~.~.~.?~.,~.~,.,~.:~,.~ ~.~,~:~.~.~.~.~.,~.~.~.~.~ ............ ..~~ ...... ~:.~.~:~ ............... . ............. ~ ....................... .:~. ...... ~490, 8,5 30.8 g~ -o.A 20.A ~28.5 30.2 ~5.~ ~.~ g.7._~.?.__A ........ ~._~ ~~j ::~::~>~:~:~ .... ~: ~ ~:;~ ~:~ ;~:::: 11510. ~8.5 21.~ 2.2 -~,~.~:.,~2.p [&~.9 21.3 Z~3 ~.2 ~:~:::~::~~:~;~:~:::~:~ :~ ::::::::::::::::::::::::::::::::::::::::::: ~ ~1530, 8,5 A3,2 8,~ -0.~ ~.n 10~.5 2:~-~ ~ ~ 11550. 8.3 20,8 2.3 ~j 15.n 9~.~ 2O.A ~.'~ ~_p 11670, 7 8 26 2 2 ARCO ALASKA O.S. 1~-9~ INC. PAGE 19 GR1 IS RUF~j WITH DIFL !??" ~"DEPTH ] 'C At.' ___$_F!l ............ DEN_ .......... _CO_fiR ......... CiNL ..... SP ............. ~ ........ ~..___ RFOC R ! LM R ! :'D D£NP 9 2~ 11770. ~,.~ 22.5 11810. 6.~ 22.7 2.1 [t,1~~ 7P.~ 22.7 A9.1 ~.g p_A °_s ~n , 11850 11870. 0.0 LIBRARY TAPE CURVE SPECIFICATIONS Company. ARCO ALASKA, INC. Well D.S. 14-9B Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 4-21-82 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale GR Gamma Ray Cased Hole Neu. 0-100, 100-200 , NEU Neutron " " " 100-1100 . ,,, · , D, $~--,t-~-O~B- ~--- ~,.~, ,~ EVER Y '--t--S-A~PI;:-ES- ..... -' u.S. i~-~B ~' GR CCL NE~- -" ,.,.S. DATA EVERY i SA~Pt.E.S CCL -- NEU CURVES : CCL NEU -r,, ,.,. a~ It../ A.& I · :.r~u,-, i07~0',00 '"" "'"90 O0 -',..v~,-. SPACING ' 0,5000- ~.5.. gA~LE.g 2ER RE£ORD., LIS~-R¥ IAPE CUKVZ SFZCIYICATIONS Company ARCO ALASKA, INC. Well D.S. 14-9B Field PRUDHOE BAY County, State N. SLOPE, ALASKA Date 3-11-83 (THIS TAPE CONTAINS 3 FILES) Curve Name (Abbrev.) Standard Curve Name Logs Used Scale FILE 1 RAT1 RAT2 Ratio Pass 1 " " 2 DDNLL RAT3 " " 3 " " RAT4 " " 4 " " 8 -- --2 NL1 Sigma Pass 1 I " 60 - 0 I NL2 t ,, ,, 2 t " ,, · ,, NL3 " " 3 " " [ NL4 I" "4 " " i NL5 " " 5 " " Gll Gate One Pass 1 " 0 - 1000 Gl2 " " " 2 " " · Gl3 " " " 3 " " . Gl4 " " " 4 " " Gl5 " " " 5 " " G21 Gate Two Pass 1 " 0 - 167 G22 " " " 2 " " LISRARY TAPE Cb~RV l SF£CITICAIIONS Company ARCO ALASKA, INC. Well D.S. 14-9B Field PRUDHOE BAY County, State N. SLOPE, ALASKA Curve Name (Abbrev.) Standard Curve Name Logs Used G23 Gate Two Pass 3 DDNLL G24 " 4 G25 " " " 5 FILE 2 MON1 MON2 Monitor Pass 1 " " 2 !1 Il 3 MON3 Date 3-11-83 .... Scale MON4 " " 4 I, MON5 " " 5 " GR1 Gamma Ray Pass 1 " GR2 " " " 2 " GR3 " " " 3 " GR4 " " " 4 " ..... 0 - 167 !l Il 0 - 2000 Il Il Il 0-100, 100-200 !! !l !! !! GR5 ss1 Short Spaced Detector Il " 5 Pass 1 SS2 " 2 SS3 " " " " 3 SS4 " " " " 4 35 - 535 LIBRA-RY TAPE Cb~RV £ SF£CIFICATION$ Company ARCO ALASKA, INC. Well D.S. 14-9B Yield PRUDHOE BAY County, State N. SLOPE, ALASKA Date 3-11-83 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale SS5 Short Spaced. Detector Pass 5 DDNLL 35 - 535 LS1 Lo, ng Spaced Detector Pass 1 " 0 - 200 LS2 " ,, ,, ,, 2 t " ,, LS3 " ,, ,, ~ ,, 3 I " ,, LS4 " " " " 4 " " LS5 " " " " 5 " " FILE 3 ' ' GRB !. G..amma Ray Baseline .. DDNLL 0-100 ~ 100-200 NLAV 1 Sigma Average 60 - 0 NLLO !Not Used NLHI Not Used HILO Not Used , DIFL Not Used ....... 0 6 Ig83 gnshorage E£C NUMBER 1652.00 ARCO ALASKA INC. -- D,S, l~-gB - 12 ~ GRB' G'RI NL! NL2 NL3 NL~ NL~ NI_AV NLHI HILO DIFL NLLO LEVEL SPACING 0.5000 PAGE ARCO ALASKA INC. D.S. 14-9B ,:-- GRB GR1 NL1 NL2 NL~ NL4 NL5 NLAV .... ~_g_~.~ ..... NLHI ~~_ DIEl ~.09z. 74.7 0.0 0.0 0.0 o.n 0.0 0.0 0.0999s.9 11093. 74.7 0.0 0.0 0.0 O.D 0.0 0.0 0.09999 11.095. 74.7 0.0 0.0 37.6 O.fl 0.0 0.0 0 0 37 11097. 75.8 0.0 0.0 37.6 35.7 0.0 40.0 20 0 35 11099. 71.6 0.0 0.0 37.6 35.7 37.2 40.0 AG.G 35 11101. 77.0 77.1 37.0 37.6 35.P 37.9 40.0 37.6 35 11,103. 71.4 74.1 35.7 3~.8 3G.A 33.7 37.9 36 2 33 1110~. 6 39 8 ~,5 5 .~ 3 3. 11115. 11 11123. 150.1 155.7 23.8 23.3 23.q 25.~ 23.8 p3~ 23,3 ~~~?_~&. 11127. ~8,5 2q3.2 25.2 2~.7 22.~ 2G.1 23,2 ~.2 22 "2 .................. 2-2.1 20.8 20.7 22.3 21.q. Pl.5 20,7 22.,3 I .6 O. PAGE 2 ARCo ALASKA INC. O.S. 14.-98 FT. BSLIN£ PA$$1 PASS! PASS2 PAS$~ PA$$4 PASS5 GRB GR1 NL1 NL2 NL-~ NL4. NL5 NLAV NLLO NLHI :HTLO nlF 1114.1. 60.6 42.4 23.1 21.5 21.~, 20.6 22.0 pl.7 20 1~14~. 1,~7.4 41.2 20.~ e0.7 21.. 2 ~ z 20 5 ~ 11145, 143.1 111.0 25.4 24.5 25.p 24.1 25 I 94 9 24 11147. 2; ,4 24.0.5 3 34 8 11149. 3~.5 50.1 17.7 1~.2 16.A 19.0 21.9 18.$ 16 11 4.2.5 22.0 2~.. 4. 22.c) 20.9 1 7 0 111 ,7. 80.4 66.1 32.2 50.1 29o~ 28.0 31.7 .~0.1 28~ 52.2 ..~.2 2. 11_169. 70.1 71.0 27.2 2a.O 28.x~ ~1.5 29.0 ~8.5 27.2 51.5 . , ~. ~.~,~.~.~?.~,.?~ .,, ,..,,,, ~, ,~. ,~ .~. ~ ..... ~~~;~:~ ~ ~~ ~:.~...~.~ ..... ,~,~ ......... ~.?~ ~ ........ ~-~ .?..>~ ~ 1~171. 78.2 79.6 ~26.7 27.3 29.X 30.2 25.3 ~7.8 25.3 .__3Q.2 ....... 1~173, 62,5 ~.7 27,7 29,8 27.~ 28.~ 29,8 pB.~=~ 27~6 29.8 Z~175, 155.6 ~,2 33,6 33.5 3~.A S~ 31,7 ~3.5 31.7 36..~ ........ 11177, 220,9 217,8 33,7 33,9 33,7 32.2 33.8 A3,7 32,2.. 3~.9 ~Z179, ~56,2 227,3 26.3 27,4 28,~ 28.3 29.0 p8~2 ~ 29.0 1-~ O. 11181. 157.7 175,5 28.0 2~.~ 2~.1 26.6 2~,1 P5.~ 2~.1 28 .0 25.0 31.n 29.~, 30.7 ~0.,?.... 25.0 32.0 ?.0 5~ ARCO ALASKA INC. O.S. 14-9B PAGE DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FT,' BSLINE PASS1 PASS1 PASS2 PASS~ PASS4 PASS5 GRB GR1 NLZ NL2 NL~ NL4 NL5 NLAV NLLO 11i91. i7S.6 8%.4 17,9 18.9 19.~ 16.9 16.6 17.9 16 ,6 86.4 2o.1 17.5 17.~ 11193. 127.7 166 ) 18 5 18 P 2( 6 19 7 19 6 18 2 22 11195. 69.0 1%7.9 18.6 18.8 18.~ 18 0 18 0 ~'8 11197. 59.0 86.0 17.3 18.2 15.1 18.% 17.1 1 3 1 11199. %0.8 %9.2 17.3 18.9 l&.0 19.5 18 7 18 45 6 15.5 14 6 15 ~ 18 7 16 7 1_6 1 11 15 7 15.% 1'5 5 15 %3.0 15.8 16.9 15.7 16.7 1~.8 1.5.9 1%.8 ~ 1 1 17 ~ 1 16.9 ~.8 1. 15.2 P.5 1. 11 2 il 7. 6! .2 56.2 19.3 18.6 18.~ 22.0 20.7 19~18.6 50.0 l .o Z~223. 59.8 G7.3 22.2 2~.0 23.7 21.9 21.0 P2 5 21 11227. 70.5 71.8 2~.1 2~.2 27.~ 21.2 26.2 ~.5 21 2 27 25.2 27.1 25.5 2~.4 P%.8 25.2 27.3. a.8 2, l&.3 20.~ 17.5 21.6 1.9.5 16.5 2~.5 a.1 3, PAGE ARCO ALASKA INC. D.S. 1~-9B DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FT. BSLZNE PASS1 PASS1 PASS2 PASSX PASS~ PASS5 _ GRB GR1 NL1 NL2 NL~ NL~ NL5 NLAV NLLO NLHI HTLO O~EJ 112~3. 1%.9 5 8 8 17 19 ~ 1 18 I 7 19 112~5. 35.7 18.0 15.0 1A.O 17.n 1~.3 1~.9 i5.~ 1~ 112~7. 52 3 38 3 18 2 17 9 17 A 20 0 19 8 18 6 17 112~9. 16.0 38.0 18.1 18.0 21.0 20 2 19 ~ 19, ~ 18 18.7 22.0 17.5 ii ' :~:~' ::~ :~i,i,:~ :i~:;i~: :~i:, iii i, :~ ~!~, ii!iii,~, i:,!i~ $ 0 20.6 ~.8 2. 11265. 1 1~267. 21.3 ~22.~ 21.6 ~}.0 20.~ 17.5 20.5 PO.D~7o5 21.6 11269. 13.3 19.7 20.~ 20~ 19.A~ 18.8 ~0 18.8 20.7 11277. 6~ 71.2 35.~ 3S.1 35.7 35.8 ~~5..~,., 32.3 .35'~ 11281. 36.1 53.7 2~.~ 26.1 22.~ 23.3 23.6 P3.8 22.0 26 o8 37.8 22.5 ~9,0 19,.~ 21.8 PAGE 5 ARCO ALASKA INC, D,S. 14-9B DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA '~'FT, BSLINE PASS[ PASS[ PASS2 PASS~ PASS~ PASS5 GRB GR1 NL1 NL2 NL~ NL4 NL5 NLAV NLLO NLHI H?LO .DIF :11290. .i2,, 0 1,5,1 18.3 17,8 17,,~ 19.2 19.3 11291. 12.0 17.1 17.1 18.0 16.5 19.0 18.0 17,7 6 17,3 1~,6 16,1 11293, 14.7 14,0 17,8 17,1 16.S 16.8 16,9 16 9 16 5 11295. i6.3 i7.8 i5.6 1R.O ia.? i6.9 !6.5 i7 i 15 6 11297. 15.1 13.5 17.8 18.6 18.~ 5 9 17 6 17 8 16 9 11299, 14.8 13.2 17.1 17.2 17.~ 17.5 17,1 17 3 17 I 17 16,8 15,9 19 2 11 3, 1 ,8 16,7 16,5 15,8 18,~ 16.3 16.5 16,5 15,8 18 8 11 ~5. 1 11.9 18.8 19.8 19.A 18.5 18.2 19.0 18,2 19,8 18,8 I 6 2 0 I 1. 1. 0 11 17 5 16.5 11319. 17,2 17,3 18,1 17,5 17.~ 18,7 17,1 17 8 17 0 18,6 17 7 16 5 19,0 1'7,9 16,5 11 1~,7 17,8 17.4 17,q 18,8 18,2 18,0 17,4 18 8 PAGE 6 ARCO ALASKA INC, D,S. l~-gB DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FT, BSLINE PASS1 PASS1 PASS2 PASS~ PASS~ PASS5 GRB GR1 NL1 NL2 NL~ NL~ NL5 NLAV NLLO NLHI HTLOnIFI 18.5 18.3 17.9 17.9 17,0 17.5 77 7 113~2- 17,8 16.0 18.7 1~.3 17.:~ 18,~ 17.4 18, 115~5. 17.5 17.3 17.8 i~.2 15.~) 16.~ 16 9 ~6 - ~ Ii~7. 22.5 lq.7 l&.6 17.~ la.5 l&.9 16.q ~7.0 - ~5q~9. 35.0 23.0 IS..I ~9.2 ~9.~ Z8.6 k8.6 ~8.8 ~8 ~,~,551. ~5.0 36.5 20.9 18.8 17.a 20,2 1,7.7 9~8 9 17 ~ '~ ~ ,~- 11367, lZ,O ~1.6 16,0 15,9 15,c}~1~ ~.~.~.,9 15,9 11369, lq.,9 13,~+ 17,1 ~,1 17, A~I~ .... 17,5 1.7,7 17 L~.. ~ 11371, 1~,8 15,3 ~7,3 1~,3 1~,~ 18~? .... 18 ~.~.. 16,3 18.9_ ~j 1 11373. 19.6 1~,5 16,0 15,0 15.~ 16.8 17.8 16.0 15 0 17 "- 11177. 11,2 11.4 17.4 ,!~.0 ~_~5.n 15.3 16.~.,~_.._~&~G 15,0 17.4 J ........: .... . ...... ~: ~~,: ....... . ~.,...::: .... ...... i-i-~B-ig~ 1 a . 0 i ~ . 5 14 , ~ i G . 2 17 . ~ 15 . 5 15 . ~ ~ ~ . e I V ~ .... ....... ~i"~. 9 16.9 17,3 18.0 17.~ 16.7 17,3 16,7 1 PAGE 7 ARCO ALASKA INC, D.S. 1~-9B DEPTH GAMMA GAMMA SIGMA SIGMA SIGM~ SIGMA SIGMA GRB GR1 NL1 NLe NL~ NL~ NL5 NLAV_ _N_.L. LO JL~LHI_ HyLO_ 11391. 12.3 13.1 15.5 1~.2 1].393. 12.7 12.9 16.0 17.7 15.n 11395. 13.9 10.7 15,5 15,7 17.8 11397, ~5.6 17,5 16,6 16,5 11399. l~.q 21.9 1~.3 1~.6 16.q 15.8 15.8 16.2 15.0 16 0 15.1 15.~ 18.? 15,6 17.~ 16.8 1.5 5 15 ,7.e 15 6 lb 7 1~ il~oi. 9.0 16.5 lS.6 1~.0 15.A ~s 15.0 ~5.D 1..~,: _~~ 11~03. 18,1 2~,2 16,0 15,7 15,.~ 16.6 16,8 1.6,1 15,3 16 8 11 I 2 13,0 15.8 9.8 1. 16.3 ~.1 1. 11 1 8 1 11%17, 11,2 lq.,5 16,7 1&,8 15,~. 16,2 15,7 11.~+19, 18,7 1~,8 16,6 15,6 15,1 16.5 16,6 16,1 15,1 16.6 ......................... "~'~";"~- ................... ~i"~";"~~ ................... 'i'"~';"~ ................... '~'"~"';~ ................... '~"7~:'""~7'~~ ............ ........... iY~-e-~2 ......... i-5-;'"~ ................. i-'5'";'"g .................. i'"~"TO ............... ~"';'"~' ............... i'"~'~;"~{- l~. 6 ........ :~&-- is.1 i~.a is.i i~.5 15.n 15.~ 15. ~:::;':::'~:~:::??TT;~:~:':: :~ :~:.~: :: ::~: -- 11%29, 1 .2 20,2 1%,% 1~.1 l~,e 15.2 1~ lq,5 1~,0 ~'- 11~31,' '~,6 37.2 19.7 1~,8 19,~ 16.8 17.5 18.5 16.8 19 PAGE 8 ARCO ALASKA INC, D.S. l~-gB DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FT, BSLINE PASS1 PASS1 PASS2 PA$S~ PASS~ PASS5 GRB GR1 NL1 NL2 NL~ NL~ NL5 NLAV NLLO NLHI HTLO ~IF 11~1. 16.0 16.~ 17.9 18.9 20.~ 17.3 18.7 5 25 114q, 3, 16,8 14,4 21,5 18,7 19,0 20,3 18,0 19 5 18 0 21 5 .~, 11445. 37.3 21.2 17.9 la.5 17.7 17.7 19.0 17 7 16 5 19 114~7, 17,0 40,2 16,8 l&,2 ? 7 17 0 16.8 16,2 17 11449. 15.0 12.9 17.1 17.5 17.4 16,~ 15.3 16 9 15 3 17 .5 1~,~ 18.0 17.5~ 17..~ 16.5 17.0 17.5 16.5 18'.0 ~",6 O. 11 5. 1 .0 18,6 17',~ 19.3 19,R 20.7 18.2 19.5 17,9 20 7 ~ 8 I 19.1 1.7 1, P 2 1 7 1 2 1 8 I 11' ,7. 1 .9 1.t,1~.~16~ la.1 1R.~ 17.5 16.5 17.0 16.2 la.1 i.O 1, 11469, 12.4 ~15,1 16.~,18~,~17,~ 17.0 16.6 17.1 16.2 18,0 11971. 11.6~ 15.2 =~7.2 19.3~17.9 17.3 16.8 17.6 16.8 19.3 .~.5 1, -- 11 75, 15.~ 1~.5 ~8~ 19.5 19.7 17.5 17,8 !8.6 17.3 19,7 ~,~ ........... l, 11~77, 12.7 12.6 20.0 ln~ 19.7 18.8 17.0 18,8 17,0 20'.0 9,9 1, -- 11~79. 26,~ 16.8 19.0 20.0 18,q 18.8 17.7 i"8.9 17,7 O0 0 ~ 3 1, ......................... 'r~'~s~"v'~; .............. '~-'27~ .................... i"~¥? .................. i'~'";-9 .................... i"g";"~ .................... 'i¥'T~'~"YT~ ................ i~. o ...... 3-'g'79 ................. i5.'~- ~.-6 6. o z, PAGE 9 ARCO ALASKA INC, O,S, 1~-9B DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FI* BSLINE PASS1 PASS1 PASS2 PASS~ PASS~ PASS5 GRB GR1 NL1 NL2 NL~ NLq ..... NL5 P,ILAV NLLO NLHI HTLO ~ ~: ?- ..: ,...,' ~ '. 11~91. 12.3 lq.O 17.1 18.6 17.9 17.1 17.6 /111.7 16.8 18.5 16.a16.0 16.8 11~93, 15,9 15,9 1~,5 17,7 17,A 16.8 16,6 17.4 17.5 16,6 11q95, 1~.9 16.2 17.7 17.5 17.5 17.5 17,2 17.4 17 11497. 18.0 19.0 19,7 1~.2 17.7 20.2 19,0 18.9 17 11 11 . q 0 11 . 1 5 15.7 15.3 1~.~ 16.7 16.5 15.8 14.9 16.7 ...................... '-i-i 5-~"9-; 8.6 9.6 18.2 16,1 15,g 17.1 1~9 16.9 1~ 18.2 :" ....... ~~ ....... ~-;"~ .......... -fi-'g-t- ............ i-a-TV ........... i-~-';-~- ....... i~C"~--i5.5 l~.~ ~.0 is.5 l~.~ .................. ~T517-"; .................... i'D'7'8' .............. ig'T8 ................... i'8'";"5 .................... i"a'-;'~ "'i'?.~ 17.2 17,9 ~7.5 la,5 ia.5 PASE 10 ARCO ALASKA INC. O.S. l~-gB DEPTH SAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA FT. 8SLINE PASS1 PASS1 PA.~S2 PASS3 PASS4 PASS5 11 .3 14.0 1.9.1 14.~ 14.1 14.7 ~.6 ~14,,0 15.1 ~.1 O. 15.8 ~.1 O' 5 0 il ~ 5 1 i~, ~l.~ iG.e i~.~ ~.~i~.o i~.~ ~:~.~ l~ i~.~ ~...~ e. '~' ............... ["~",~'~E~'"'~'"'"~'"s'"':'~' ..................... '~'"~Ts ................ ~-'~'":'"'~' ......... '-~'"~- .................. ~" ~Si'-T~.'"~ ......... i 11581, 10,1 9,6 17,2 1~,6 16,P 15,6 15,5 15,8 1~. 6 17 PAGE ARCO ALASKA INC, D.S. l~-9B DEPTH GAMMA GAMMA SIGMA SIGMA SIGM~ SIGMA SIGMA FT, BSL-~E PASSI PASS1 PASS2 PASS~ PASS~ PASS5 GRB GR1 NL1 NL2 NL~ NL4 NL5 NLAV NLLO NLHI H__TLO DI__E 11591, 12.1 10.1 1~,9 1G.O 15.~ 15.1 1~,5 1_5,1 1~,5 16 0 1 11.8 15.2 17,1 16.P 1 q- 15, 3 11593, 10,7 13,0 16.~ 15 ~ 15 A 15 9 15 G 15 7 15 ~ 16 4 ;[ 11595, 19,0 11,5 16,1 16,8 17,9 16,8 15,5 16 7 15 5 17,q. 19 0 11599, 16.6 17,~ 18.8 17.~ 16.1 17.8 16.3 17 ~ 16 1 1 17 7 17 * 18.5 17 n 17 9 18 1 17,8 17.0 18 5 { 17.7 la,9 18 .~,8 2 17,8 N.7 O. 18.9 }.1 1. 18.0 9.2 5 11 7~ 1' ,0 12,8 16,1 la,2 ~7~ i8,~ 18,8 18,1~1~1 18.9 11619, 11,5 13,9 18,9 17.~ 17.~ i8,?~<~..~9,3 18,3 11623. 20.3 16.7 18.5 19.2 18.0 18.1 17.9 ~.~8.3 17,9 19 2 .0 16.~ 17,25 17.9 18.7 17.6 17.6 16.9 18.7 9.3 1 .... i~::'"~~' ~:~ ~:::1:? ::~:~ ~:~' ARCO ALASKA INC, O,S. l~-gB PAGE 12 DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA ' ' FT,' BsL'I~E--PASS! PASS1 PASS2 PASS~ PASS4 PASS5 GRB GR1 NL1 NL2 NLX NL~ NL5 NLAV NLLO NLHI .... ~~:l$4~0.---i-5,8 12.0 19,3 19.2 19,8 __19,8 116~5, 15,7 18,2 15,~ 17,2 l&.~ 1G 5 16 2 16 ~ 15 6 2 ~ 11665, 15,3 11,7 16,6 16 9 17 7 16 9 17 7 17 2 16 6 7 ~ 116~7. ll.~ 10.9 17.9 17 1 1G D 15 2 16 , 16 5 15 2 17 - 11651 10 8 13 7 18 6 l& 8 18.5 17 4 17 B 17 8 1G 8 17,8 4 0 1 5 0 lie 8 ,~ 11667. I ,7 13,8 ~17.2 17,3 ~?.,~17.5 18.0 '17.~~ ~.8- 0_~ 11669. 11,6 15.3 17.8 l~ iS.P 11~,~ 16.8 17.8 16~ 18.5 11 73~ 10.9 16.9 18.0 ~_.~D~ ~!~A i8.~ ~8.3 18.0 ~5,9 iS,q ~..~ __~ 11679. 12,9 29.8 21.6 19.~ 17.g 18.9 19,8 19,~ 17.9 21.6 ~,6 2 ................ ri-e~~i-~;'-~ ............. i'i-';'~' ................. "i'v~"~ ............. i-'~-;-~-'~'~'~-~' ....... i'~ ..... i-g.9 ~7.~ ..... ~~-e. ~' ~9 2 ................................. ~;~' 'g-'; ............... i"O~~ ............. 'i 0--;--~ ...... z 9.'~ ...... ~'~";"~ ~ ~ ~ ~. z 7. ~ 3 7. ~ z ~ ~ z 9,~ ~. s 2 ARCO ALASKA INC. D.S. l~-gB PAGE DEPTH GAMMA GAMMA SIGMA SIGMA SIGMA SIGMA SIGMA : FT,' 'BSLIN£ PASS1 PASS1 PASS2 PASS,~ PASS4 PASS5 GRB GRi NL1 NL2 NL.z NL~ NL5 NLAV NLLO NLHI HTLO OIF 11G91, 10,8 10.4 17.3 16.8 17.1 16.8 17.5 17.1 16.8 17 ~-i:1692--i-'~--,5 16,6 17.~ 16.7 16,6 15,7 17 17.7 19.9 18.7 17.7 16.8 12.5 15.9 15.7 11695. 25.7 12.~ 16.8 16.8 11695. 58.1 ~ff.5 25.5 21.0 2~.P 24.8 20.0 11697. 35.6 50,2 21,8 21.1 22,n 22.6 20,3 11699, 22.1 ~0,6 19.5 21,0 21.A 20.7 21,1 1. 2!,8 24,5 19,1 21,5 20.1 18,2 11 14.8 29,1 18,5 1R,7 17,~ 18,7 11 )5, 1 28,0 19,2 18,3 1G,M 20.2 17,2 22.6 20 0 21,5 20,3 6 18.6 17,4 19 2 ! 7 1 2 15,9 19.1 5.2 1. 16.~ 1.3 O. 17.5 1.5 O. ~.4 2'. 6 11 17. 10.70273.6 i7.5 0,0 14.7 1~?~18~ 1'5.2 ~~ 1~ 11719. 10.70273.6 17.5 0.0 1~.¢, 16.3 16,~ I 5.5 14,6 i-i72"3";- i'-0-'2'70'~?-3';~ ig;5 '"6;6 o.n 0.o 0.o o.o i~.5 11 9 0 io.v o.o o.o n.o o.o o.o o. 999q. ~.~;:~ ~?~V~ ~ :~:~:~:~. ~,~ ~:?~:~. ..............