Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-075
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 02-15B Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-075 50-029-20447-02-00 11740 Conductor Surface Intermediate Production Liner 9010 80 2685 5766 8922 2873 11355 20" 13-3/8" 9-5/18" 7" 4-1/2" 9004 44 - 124 47 - 2732 44 - 5810 44 - 8966 8865 - 11738 44 - 124 47 - 2732 43 - 5372 44 - 8400 8302 - 9009 none 520 2670 3090 5410 7500 11355 1530 5380 5750 7240 8430 9900 - 11645 4-1/2" 12.6# 13Cr80 42 - 8706 9038 - 9011 Structural 4-1/2" HES TNT Perm , 8582 , 8029 No SSSV 8582 8029 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028308 42 - 8148 323 143 28911 9231 20 34 0 0 317 263 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:17 pm, Aug 06, 2024 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Reason: I am approving this document. Date: 2024.08.06 13:41:52 -08'00' David Bjork (3888) WCB 10-1-2024 DSR-8/12/24 RBDMS JSB 080824 ACTIVITYDATE SUMMARY 7/7/2024 LRS CTU #2 - 2.0" Coil Job Objective: Set CIBP MIRU CTU. ...Continued on WSR 7-8-24... 7/8/2024 LRS CTU #2 - 2.0" Coil ***Cont. from WSR 7-7-24*** Job Objective: Set CIBP Make up drift BHA with 3.60" DJN and RIH. Load well with1% KCl w/ SafeLube. Tag top of packer at 11339 CTMD (11385 MD). Unable to jet depper. PUH and paint tie-in flag at 11300' CTMD. POOH. M/U NS CIBP, RIH correct depth at flag. Set plug at 11355. POOH while loading well with 154bbls diesel. RDMO ...Job Complete... Daily Report of Well Operations PBU 02-15B () j M/U NS CIBP, RIH correct depth at flag. Set plug atg 11355. POOH Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 01/12/2023 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 4Q 2022. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through the end of 4Q 2022. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Engineer Hilcorp North Slope, LLC By Samantha Carlisle at 3:53 pm, Jan 12, 2023 Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525), ou=Users Date: 2023.01.12 14:52:49 -09'00' Oliver Sternicki (4525) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 1 „.2J ,D, _ Oq5.-Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RE AN: OVERSIZED: NOTES: C or Items: ❑ ps: Grayscale Items: Logs: E Poor Quality Originals: ❑ Other: ❑ Other: BY: WebDate: J //'17//9. /s/ )(yip Project Proofing BY: c Maria Date: /1//7//9.. /s/ mr Scanning Preparation L3 x 30 = 90 + ail- = TOTAL PAGES I/4 (Count does not include cover sheet) BY: WM Date: t/ 1/./. /s/ Production Scanning Stage 1 Page Count from Scanned File: 1/5. (Count does include cover t) Page Count Matches Number in Scann'ng Preparation: YES (Y110 NO BY: Maria D____ Date: i I /7,//4L /s/Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o 1 9 N O 9 I Z Z > t t t t t t o n 0 O N -0 ccaa 0 25 0 0 0 0 0 0 (7 3 0 (f) (n m a X N N C C C C C C 0 N Z '(o 5o 56 d N 0 '0 N'� N C) N'� 0) m CV CV Lo Lo o co 0N _ 2 Im - m N Z Z () d ,C)a .c) 0 0 a .C) () in O _in in Iii M p No 02 No o m m 2 2 in v) v)... in m in to._ o •o c a) ai o aim ii ii ZO p ZO ZO 00 p 00 0 •• Z o Z 1m D 0 0° CO Q (a C C U)M U)p_ U)J U) U)p_ (n J } a cn w O 0 )1) , < < LI- LI- > 0) > 0) > N > 0) > 0) > 0 < Q C co LL fa W.0 m 03 M m 1.0 U1 C0 J M3 m UI Ul 0 033 N J 0 m 0 '0 '= o "' O N /y�^may,9 N n O \ c) v o Z } } } o CO ,y U CYa co I cu o co Q 0.Z t r o F. I U a m Q 2 2 2 o o ca o U J o o 2 co >- Cy } co coN o et Q "8aa)QLO ZOV m ca CL } rn a N W b LL O CD ns E U- a a w a) y co W w -I 03 m rn a o COCL O E li E ZIli wco o 00) y • y Q y -I a c 747. 1 J a ca = E 5 Om0 65 2 0 0 M c 11 I 5 r 0 G N a) O a � in E /moi ) N V U y c CO to 6 }c l`JE N 6 IE °CID ' ICC co O I O 0. N V o I H M Z II ! 5 G/ ib-N y j r Cl)v0 O ti C O C 0 n O - C O Q 0 Q) I C I O. a� c• = a. Q a o- c 0 0 Z oU >, i 0 E 0 5 2 a z I d (h N 'H 11 p Q N N �H ; Z rneN C7 (O O >� W� oas } m N V co o Oa 0 3 N W c co d Ce a 2 4? >y o p m x W m ce ce a) o R. o o Q c CO - c c U ce l U rn a .o a) .c a) •ca 0 CD E O a v' o o_ a 2 0 E p LL E 2 o E y Q a 2 ? 0o a 0 0 0 co C 10 0 STATE OF ALASKA • AL .A OIL AND GAS CONSERVATION COMMI, )N RECEIVED • REPORT OF SUNDRY WELL OPERATIONS NOV 2 5 2013 1 Operations Abandon U Repair Well LJ Plug Perforations LJ Perforate U • Other U Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ ACMCC— Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WOO 2 Operator 4 Well Class Before Work: 5 Permit to Drill Number Name. BP Exploration(Alaska),Inc Development0 Exploratory ❑ 212-075-0 • 3 Address P O Box 196612 Stratigraphir❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20447-02-00 • 7 Property Designation(Lease Number). 8 Well Name and Number: ADL0028308 PBU 02-15B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11740 feet Plugs measured None feet true vertical 9009 83 feet Junk measured None feet Effective Depth measured 11648 feet Packer measured See Attachment feet true vertical 9010 57 feet true vertical See Attachment feet Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 43 98-123 98 43.98-123 98 1530 520 Surface 2684 7 13-3/8"72#L-80 47.03-2731 73 47 03-2731.53 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production 8922.02 7"26#L-80 43.7-8965 72 43.7-8400.02 7240 5410 Liner 2872.97 4-1/2"12.6#13Cr85 8865 03-11738 8302 73-9009.85 9020 8540 Perforation depth Measured depth 9900-9930 feet 9930-9960 feet 9960-9990 feet 10050-11050 feet 11050-11080 feet 11080-11110 feet 11110-11140 feet 11600-11645 feet True Vertical depth 9037 53-9043 42 feet 9043.42-9047 82 feet 9047 82-9050.8 feet 9050 93-9046 52 feet 9046.52-9045 44 feet 9045.44-9043 49 feet 9043.49-9040.52 feet 9010 22-9010.57 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 41 75-8705 56 41.75-8148.34 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 406 28775 14 0 798 Subsequent to operation. 421 24833 15 0 785 14 Attachments: 15 Well Class after work. Copies of Logs and Surveys Run Exploratory❑ Development 2 , Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work: Oil ❑. Gas LJ WDSPLIJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUGO 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Garry Catron Email Garrv.Catron(C BP.Com Printed Name Garry Catron Title PDC PE Signature 14,14,1 Phone 564-4424 Date 11/21/2013 \. 71 1Z.,y•�a RBDMSNOV 2 5 1:\ Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment ADL0028308 SW Name Type MD TVD Depscription 02-15B PACKER 1985 1906.58 9-5/8" Baker ECL Packer 02-15B PACKER 8582.4 7950.65 4-1/2" HES TNT Perm Packer 02-15B PACKER 8879.93 8238.74 5" Baker ZXP Top Packer ,0• 000000 co N O c3N- 537, M v- co LO N f- Vm i c') if) ON- N et M co CO• co l� CO 0 CO ti cr CO O CO CO CC) N M V- 0 0) 0 CO 0 Cf) M CrjcoNOOco O N- 0 0 M N O cf) 0NfN- — N tO 0) CO NCD 00 h 0 0 cM er O M Nr ' N CO N- OOCONCD 04 O M CO M N O co 0) N- N N if) CO N CO C.▪ ) CU CO 2 N • N co C Q 0 co 0 a ▪ Q 0coocooO 00U J J 09 0 0 *kJN �# •� N e COCD N CD - V O co N co - N CV C7 (V D 0 coMO N- N CO CD C co 0) CD co 0) co co J '— CY) N CDN CD W W H F— Z c Oo a a 0 .- oww 0 ' OOIXECCCOELZ Z W W W 0 cc cT3 OIZ � » 0j cL co 1— L CO Y CO Cd — - -o C7 0 aj O) 6m 0_ 00 V) co a) Co C O N , L a) c 05 • a te c .= (0 co Q O Y 0 m 0 O (00 0 C (0 F_ -0 IC) cn Q a N L r- N O a) CX) ° (U C d- Q I Q Q o •O O — J N 2 LL O -O 2 (0 -p 2 a r. CT 3 0 _ I (0 m (0 a) c0 a) C ca � +, a) b a 0N)0C)I 0)-C N 0) U> .@ (a O c:, -o a) -- coCU C3 U_ > )I N Q Q 0)r- -O r ,- O E cD a ° E 'L 0 E Npp c rc0 O r (t m O OO I as -c1 *k c0 ` LL a —3 .4- c (3 0 c C N LL Cl_ c 0 1 a CO - a O ~ p)= C a co m U) 0 a) (o U O Cfl N Lo _c o p N N Cn O c C CL D .0 0 C0 0 V) Q (0 Q Eco N O Cr) N O N p Y O N (n I ~ co: 2 1 I I 1 L o -0 Q'0 a)2 C co = t?)- co O N = •o -0 -- -- o -v CC m co "a 0) 0 = (C) 5 O • O)0t$ 0 *k O a) c0C CO0 "' L 00 C0 •N 't -0 O co c 0 CO O G 1 0 I 1 O ca CX) 1 C I 0 .4= I— (000 Q C 3C\i U- > Q ) O L< 0L< O L 0 w O ~ N N ¢ Q Y 0 0 O r 0 N OQ co J Q N O cn Q.r N 0 2 (00 (0 a) coN 2 'C N E ~ O 0 CO M N 0 � 2 '~ � 0.-0 co Q a) Q I c � 4- O Q 1 >- � I L c O p) -O O L — _c M ,.."0 r �_ CO 0 a 0 Q)i °) Q C a) 03 Q C p ZT c (n pp io a c) . E U t c 64 m � m Nd R� moo � � � o� moo p Qao 0) O J U m= Lo cl U L_ m - m 0 °p = a Mo 0co cXao ami (0 m 00 0 Y 'p U N (0 (0 r N 2 N E ' LL O LL o QO LI- 06 C U- x62206 ' Qa LOLL ao 0U a) ,_ 0 cc " u) 0 (moo = 0)a) .c CD - CL oa Uw) m a � a) a a -c � aa9 o Q CO E � aa Ce CL mQ v, �Q E 0) Q) -0 2 m 0O O �M N O (0 0 aj N *k C •c E 0 U) •C .L - .c 0) C C1 Y N C O O a' c O a r= 0) r to Y E 2 O O - O co tl al O C0 (0 Q O Uj 0 w � o E D u0) 0 4 m 0 LL N t3) O 4 m 0) O m o0 � 0` M � � � � 0 00 ( 02 `) � � UO � `) X00 ° NU0) N- — • C0 Q L. @ U) 0)N r > Q 0) N- I �, 2 aj 02 0 o r a) -0 .- p n ° r a; � r c° ° X 2 r aj coo t3) 3 o 0) > CO > c) - ma � 2 (n N a > 2rn o2 O o � 2 (0 g a i) ° � .a) a ,t c -5 c c 2 •c •o fi E Q a- a) o c a) -ON- a) - o o m - a) 0 0 * O 0 0 N Q .0 O 't O (co cci.cr QOM p *k (ten m� O) o _ o cn 1* - I--- �O - I— (YO p •• I-- O O '- 2 ,- : I— p OQ N E : _s* p p d M 0 - 20 E _J 0 -3Q a - I 0 - Fc CO 0 - WH (/) o . M CO M M r r r r O o O O v N N N N .fs. IC) CO N- 00 r N N N N m O O O O ' r r r "‘"- B.W A A A a) a E O 0 O V V V N C 0 Ri L0 03 0. Q O M < 0 CD O d N O `- O 0 J u_ 0 < 0 IX 6 a � D i o D aim t5 o U 0 0 co O N N O TREE= , 4-1/8"CNV WELLHEAD=9-5/8 CNV SLP-LOO( 02-1 5 B S ,irY NOTES: WELL ANGLE<70°@ 9740' ACTUATOR= BAKER C I . --',4NTVIL KB.ELEV 64' BF"ELEV=KO20"CONDUCTOR H 110' ~' P= ---.— 3200' 94#,H-40, r 1963' H9-5/8"ES CEMENTER Max Angie= 1010©11204' Datum MD= 9515' D=19.124" '' 1985' 19-5/8"BKR!SO-ZONE --__. ... .._._.. Datum TV D= 8800'SS EXTERNAL CSG PKR,D=8.70" / 9-5/8"CSG,40#,HYD 563 XO TO L-80 BTC-M - 1943' + 2014' H4-1/2'HES X NP,D=3.813" 9-5/8'CSG,40#,L-80 B TC,D=8.835' —I 2007' t f. WINDOW WDOW(02-15B) 5810'-5827' 13-3/8"CSG,72#,L-80 BTC,D=12.347" —I 2717' 4. -,.,,, 9-5/8"CSG,47#,L-80 BUTT,D=8.681" 5810' GAS UFT MANDRELS 9-5/8"WHIPSTOCK(02/XX/13) —I 5810' ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3530 3521 16 KBG-2 DOME BK 16 03/31/13 4 6013 5525 36 KBG-2 SO BK 20 03/31/13 Minimum ID = 3.725" 8683' 3 7040 6497 4 KBG-2 DMY BK 0 03/25/13 2 7864 7319 2 KBG-2 DMY BK 0 03/25/13 4-1/2" HES XN NIPPLE 1 8519 7967 14 KBG-2 DMY BK 0 03/25/13 I I----I 8663' —14-1/7 HES X NP,D=3.813" x8682' —17^X 4-1/2"HES TNT PKR D=3.856" 8617' —14-1/2"HES XMP,ID=3.813" ' 8693' —14-1/2'HES XN NP,0=3.725" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, —1 8704' / .0152 bpf,D=3.958' 8706' --I4-1/2"WLEG,D=3.958' --I H-MD TT NOT LOGGED 7"LNR 26#,L-80 VAM TOP HC XO TO L-80 BTC-M —1 8840' Hoc x ri TOP OF 4 1/2"LNR — 8866' 8865' 1rix 'X 5'BKR HRO-E ZXP PKR w/TEBK.D=4.320' 8888' H7"X 5"BKR FLEX-LOCK HGR D=4.32" 8897' H5"X 4-1/2"XO,D=3.920" 7"LNR 26#,L-80 BTC-M,.0383 bpi,D=6.276" —1 8966' PERFORATION SUMMARY , REF LOG: ???? ANGLE AT TOP PERF:920 @10050' Note:Refer to Roduction DB for historical pert data SIZE SW INTERVAL Opn/Sqz SHAT SQZ 2.88" 6 9900-9990 0 0/27/13 2.88" 6 10050-11050 O2_ 2.88" 6 11050-11140 0 (\10127/13 2.88" 6 11600-11645 C 03/23/13 iso- I 11549' I-14-112"KB PKR w/ORFACE,ID=.375' FBTD H 11648' \ 4-1/2'LNR,12.6#,13CR-85 VAM TOP HT, —I 11738'D +.�.r. -"r.r- .r., .0158 bpf, =3.958' *..,*. DATE REV BY COMMENTS NITS DATE REV BY COM48JTS PRUDHDE BAY UNIT 07105/80 PKR 176 IMTIAL COMPLETION WELL 02-15B 07115/96 N2ES CTD SIDETRACK(02-15A) R32MT No:'2120750 03/26/13 PKR 273 SIDETRACK(02-158) AR No: 50-029-20447-02 04/08/13 JT/PJC FINAL ODE APPROVAL SEC 36,T11 N,R14E,450'FNL&829'FWL 04/08/13 SWC/PJC GLV C/O(03/31/13) 11/09/13 JCF/PJC KB PKR/ADFE RFS(10/27/13) BP Exploration(Alaska) Page 1 of 1 Okland, Howard D (DOA) From: Okland, Howard D (DOA) Sent: Monday, September 30, 2013 2:07 PM To: 'Lastufka, Joseph N' Subject: PBU 02-156(212-075) Joe, We have not received any open hole logging ( prints or digits) for PBU 02-15B(212-075). The well was completed 03/26/2013. The completion report block 21 lists "MWD/GR/RES/DEN/NEU, GR/PDC/LWD GR, MWD/GR/RES/NEU/DEN" Would you please track down the data and get it over to us as soon as possible? TNX, Howard 9/30/2013 RECEIVED STATE OF ALASKA APR 2 3 2013 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG AOGCC 1 a. Well Status: . ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25105 2OAAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One • ®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 3/26/2013 • 212-075 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 3/4/2013 • 50-029-20447-02-00 - 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 3/17/2013 PBU 02-15B- 4830'FSL,829'FWL,Sec.36,T11N, R14E, UM • 8. KB(ft above MSL): 78.38' 15.Field/Pool(s) Top of Productive Horizon: • 4604'FSL, 1547' FEL, Sec. 35,T11N, R14E, UM GL(ft above MSL): Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 4689' FSL,3554' FEL, Sec.35,T11N, R14E, UM ' 11648' 9011' ' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 687567 • y- 5950750 • Zone- ASP4 . 11740' 9010' • ADL 028308 • TPI: x- 685198 y- 5950466 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 683189 y- 5950502 Zone- ASP4 None 18.Directional Survey: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES/DEN/NEU, GR/PDC/LWD GR, MWD/GR/RES/NEU/DEN 5810' 5372' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 110' Surface 110' 30" 431 sx Arctic Set 13-3/8" 72# L-80 Surface 2717' Surface 2717' 17-1/2" 2050 sx Fondu&400 sx PFC 9-5/8" 40#/47# L-80 Surface_ 5810' Surface 5372' 12-1/4" 1400 sx Class'G',720 sx Class'G' 7" 26# L-80 Surface 8966' Surface 8400' 8-1/2" 157 sx Class'G' 4-1/2" 12.6# 13Cr85 8865' 11738' 8303' 9010' 6-1/8" 326 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) _ 2-7/8"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr80 8706' 8582'/8029' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10050'-11050' 9051'-9047' ,,.-,f,,,, WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes 0 No 11600'-11645' 9011'-9011' ti 1 - u;� F •• DEPTH INTERVAL(MD AMOUNT AND KIND OF MATERIAL USED .,,,: il 2200' Freeze Protect w/79 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc _ April 5,2013 Flowing _ Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 4/13/2013 10 Test Period ♦ 303 8381 11 54 27649 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 820 1020 24-Hour Rate ♦ 728 20115 26 N/A 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No • Sidewall Core(s)Acquired? 0 Yes ®No. If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS APR 2 4 1013 , Form 10-407 Revised 10/2012 07/ CONTINUED ON REVERSE 7.58 do, 9ubmit Original Only 'G 29. GEOLOGIC MARKERS(List all formations ar ;ers encounter 30. FORMATION TESTS NAME MD TVD Well Tested? U Yes ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. West Sak 6501' 5963' Coleville Mudstone 6951' 6408' None HRZ 8496' 7945' Base of HRZ 8708' 8151' Put River 8795' 8235' Kingak/LCU 8810' 8250' Sag River 8960' 8394' Shublik 8998' 8431' Sadlerochit/Zone 4 9074' 8505' 42SB/Zone 4A 9166' 8591' CGL/Zone 3 9274' 8689' Base of CGL/Zone 2C 9357' 8761' 23SB/Zone 2B 9445' 8830' 22TS 9513' 8877' 21 TS/Zone 2A 9578' 8916' Zone 1B 9716' 8983' TDF/Zone 1A 9812' 9015' Zone 1B(Invert) 11253' 9021' Formation at Total Depth: Zone 1B(From Base) 11253' 9021' 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: JacThompso 64-5579 Email: Jacob.Thompson@bp.com Printed Name: Title: Drilling Technologist J tufk (( 2 Signature: _ Phone 5644091 Date: 4/z 3/i 3 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/8"CNV WELLHEAD=9-5/8 CNVSL -LOCK 02-1 5 B • rY NOTES: WELL ANGLE<70°@ 9740' ACTUATOR= _ BAKER C URAL KB.ELEV 64' .>, 74 I —._. BF ELEV= _ 20"CONDUCTOR, 110' `. ,.r KOP= 3200' 94#,H-40, � 1963' y . H9-5/8"ES CEMENTER M x Angle= 101" 11204' • Datum MD= 9515' D=19.124" y 1985' —9-5/8"BKR ISO-ZONE Datum TVD= 8800 SS EXTERNAL CSG PKR,U=8.70" 9-5/8"CSG,40#,HYD 563 XO TO L-80 BTC-M — 1943' ! 2014' —{4-112"HES X NP,D=3.813" 9-5/8"CSG,40#,L-80 B TC,D=8.835" —{ 2007' *- r`k �Y Mt LOUT WPJDOW(02-15B) 5810'-5827' 13-3/8'CSG,72#,L-80 BTC,D 27 =12.347" 17' — L 9-5/8"CSG,47#,L-80 BUTT,D=8.681" H 5810' GAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 9-5/8"WHPSTOCK(02/XX/13) —{ 5810' 5 3530 3521 16 KBG-2 DONE BK 16 03/31/13 L 4 6013 5525 36 KBG-2 SO BK 20 03/31/13 3 7040 6497 4 KBG-2 DMY BK 0 03/25/13 Minimum ID = 3.725" @ 8693' 2 7864 7319 2 KBG-2 DMY BK 0 03/25/13 4-1/2" HES XN NIPPLE 1 8519 7967 14 KBG-2 DMY BK 0 03/25/13 I , 8663' H4-1/2"HES XNP,ID=3.813" S X 8682' H7"X 4-112"HES INT PKR,D=3.856' ' [ 8617' 4-1/2"HES X NP,ID=3.813" 1 in—{ 8693' H4-1/2"HES XN NP,D=3.725" 4-112"TBG,12.6#,13CR-80 VAM TOP, — 8704' !--/ \—I 8706' H4-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" --I ELMD TT NOT LOGGED 7"LNR,26#,L-80 VAM TOP I-C XO TO L-80 BTC-M —I 8840' Ho< >c TOP OF 4-112"LNR H{ 8$65' 8865' —7"X 5"BKR HRD-E ZXP PKR /0,.._ w/TPBK,D=4.320" ,hii 8888' H ^ 7"X 5"BKR FLEX-LOCK HGR U=4.32" 8897' H 5"X 4-1/2"XO,D=3.920" 7"LNR,26#,L-80 BTC-M,.0383 bpf,ID=6.276" — 8966' , PERFORATION SUNtMARY REF LOG: ???? ANGLE AT TOP PERF:92°@10050' Nate_Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 2.88" 6 10050-11050 0 03/23/13 2.88" 6 11600-11645 0 03/23/13 -r- PBTD H 11648' 4-1/2"LNR,12.6#,13CR-85 VAMTOPHT, —r 11738' N',k..:20, • .0158 bpf,U=3.958" t' - DATE REV BY COMMENTS DATE REV BY COMvU4TS PRUDHOE BAY UNfl 07/05/80 PKR 176 IMTIAL COMPLETION 03/29/13 PJC DRLG DRAFT CORRECIIONSW WELL 02-15B 05/08/90 AUDI#4 RWO 04/08/13 JT/PJC FINAL DRLG AFtROVAL-ODE PERMT No:"2120750 08/14195 D16 RWO 04/08/13 SWC/PJC GLV C/O(03/31/13) AR No: 50-029-20447-02 07/15/96 WES CTD SIDETRACK(02-15A) SEC 36,T11 N,R14E,450'FNL&829'FWL 03/26/13 PKR 273 SIDETRACK(02-15B) 03/25/13 PJC DRLG HO CORRCTIONS BP Exploration(Alaska) BP AMERICA LOT / FIT Summary Well Name: 02-15B Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/03/13 LOT 5,839.00 5,384.00 9.80 1,000.00 3,740.95 13.38 03/13/13 FIT 8,966.00 8,400.00 8.50 1,100.00 4,809.10 11.02 Page 1 of 1 North America-ALASKA-BP Page 1 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/8/2013 00:00 01:30 1.50 MOB P PRE BEGIN RON EVENT WITH PARKER 273 DRILLING RIG AT 00:00,COMPLETE SECURE OF MAST ON RACK,AFTER ACTION REVIEW ON LOWER MAST WELLWORK TRANSFER PERMIT OPEN WITH DRILLSITE OPERATOR. WELLS SUPPORT DHD BLEED IA FROM 150 PSI TO 3 PSI AND MONITOR FOR 30 MIN. PRESSURE BUILDS UP TO 4 PSI. ALL VALVES CONFIRMED CLOSED ON TREE AND WELLHEAD FOR MOVING IN RIG. NO WELLS ON PAD SHUT-IN FOR MOVING RIG. BARRIERS FOR MIRU: TUBING: CIBP,KWF,BPV INNER ANNULUS: PROD PACKER,KWF, PASSING MIT-TXIA,DOUBLE BARRIERS ON OUTLETS OUTER ANNULUS: INNER CSG PACKOFFS, PASSING MIT-OA,DOUBLE BARRIERS ON OUTLETS 01:30 - 06:00 4.50 MOB P PRE PJSM VERIFY ALL LINES DISCONNECTED BETWEEN MODULES AND REMOVE COVER PLATES,LOCK ALL ACCESS DOORS,MOVE CUTTINGS TANK,RELOCATE MUD PRODUCT WARM UP SHACK,SHOVEL SNOWAND ICE BUILD UP IN PATH OF MODULES,ROTATE TIRES IN PREP FOR JACKING AND SKIDDING MODULES. 06:00 - 12:00 6.00 MOB P PRE PJSM,RAISE UTILITY MODULE AND TELESCOPING SUPPORT COLUMNS,WALK UTILITY MODULE TO WELL DS2-15B,MOVE AND SET RIG MATS FOR MUD MODULE ON WELL DS2-15B,TROUBLE SHOOT BOOSTER AXLES ON MUD MODULES. 12:00 - 18:00 6.00 MOB P PRE SEPERATE MUD MODULE FROM DRILL MODULE BY 5 FT,MOVE DRILL MODULE OFF WELLAND SPOT ON DRILLSITE. 18:00 - 19:00 1.00 MOB P PRE MOVE WELLHOUSE FROM 02-12 TO 02-15. WSL WITNESS. 19:00 - 21:00 2.00 MOB P PRE REMOVE HANDRAILS FROM WELLHOUSES IN MOVE PATH. SHORE UP WELLHOUSE OVER 02-15. NOTE: 1 LEAK OF FRESH WATER,3 BBLS TOTAL,2 BBLS IN CONTAINMENT INSIDE THE RIG,1 BBL ON THE PAD OUTSIDE THE RIG CONTAINMENT,NOTIFICATIONS MADE. 21:00 - 00:00 3.00 MOB P PRE MOVE DRILL MODULE FROM STAGING LOCATION ON DS02 TO POSITION IN FRONT OF 02-15. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 2 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-01 OHM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/9/2013 00:00 - 06:00 6.00 MOB P PRE PJSM,RAISE AND MOVE UTILITY MODULE 2 FT AWAY FROM DRILLING MODULE TO ALLOW ENOUGH SPACE TO SPOT DRILLING MODULE OVER THE WELL,WARM UP MUD MODULE AND READY TO MOVE TO 2-15B, TRANVERSE DRIVE MUD MODULE TO 2-15B, 06:00 - 12:00 6.00 MOB P PRE SPOT BOTH MUD MODULE AND UTILITY MODULE TO DRILLING AND SHIM IN TO PLACE 12:00 - 14:00 2.00 RIGU P PRE RIG UP ALL HOSE INTERCONNECTS AND ELECTRICAL INTERCONECTS,POWER UP ENGINES AND VFD 14:00 - 18:00 4.00 RIGU P PRE INSPECT MAST,RAISE MAST(530 KLBS OFF HEADACHE RACK),PLACE CATTLE CHUTE, AND SKID FLOOR OUT OVER WELL HOUSE, SKID HAUNCH IN TO RIG FLOOR 18:00 - 00:00 6.00 RIGU P PRE HOOK UP ALL FLUID AND ELECTRICAL INNER-CONNECTIONS BETWEEN MODULES, HOOK UP FLOW LINE AND MUD GAS SEPERATOR LINE,INSTALLALL WALKWAYS AND CAPS IN PIPE BARN.PLACE BERM FOR CUTTINGS BOX AND SET SAME,RIG UP RIG FLOOR 2/10/2013 00:00 - 06:00 6.00 RIGU P PRE RIG ACCEPTED @ 06:00,02/10/2013, RIG UP RIG FLOOR,UNBRIDLE MAST AND PIN T/D TO BLOCKS,HANG UP BRIDAL LINES.TURN ON SERVICES BETWEEN MODULES,LAY OUT/RU HARD LINE AND TEST SAME FROM WELL HOUSE TO TIGER TANK,RIG UP ALL SENSOR EQUIPMENT AND CALIBRATE. 06:00 - 13:00 7.00 RIGU P PRE REMOVE GAUGE FLANGES AND INSTALL THREAD FLANGES ON OA AND IA,RIG UP TEST MANIFOLD AND BLEED TANK HOSE TO IA,R/U VALVES AND SENSOR,SECONDARY CIRC LINE FOR TESTING.CONT ATTACHING SERVICE LINES AND INSPECTION,MOVE 50 BBLS OF SEA WATER TO RESERVE PIT#1 FOR BOP TEST. STRAP AND TALLY 4"DP. 13:00 - 14:00 1.00 RIGD P PRE EVAC DRILL,HOLD AAR WITH ALL HANDS INVOLVED&COVER AFTER ACTION REVIEW ITEMS. 14:00 - 15:00 1.00 RIGD P PRE PRE-SPUD MEETING. 15:00 - 18:30 3.50 RIGD P PRE TEST ALL SURFACE EQUIPMENT,TEST O.A. TO 250 PSI LOW FOR 5 MIN,TEST 2000 PSI HIGH FOR 30 MIN(PASS),TEST I.A.250 PSI LOW FOR 5 MIN,TEST 2500 PSI HIGH FOR 30 MIN(FAIL)(CONSULT WITH WTL,WILL PROCEED WITH RISK ASSESSMENT IN PLACE),BLOW DN/RD LINES,CHART AND CALC ATTACHED. 18:30 - 19:00 0.50 BOPSUR P PRE SERVICE RIG,CHANGE OUT SAVER SUB, CHANGE OUT GRIPPER DIES. SERVICE T/D,ST-80,ROTARY TABLE. 19:00 - 22:00 3.00 BOPSUR P PRE PJSM,BLEED OFF VOIDS AND TREE,SUCK OUT TREE AND N/D DRYHOLE(DOUBLE GATE VALVE)TREE AND"K"13-5/8"X 7-1/16"5M TUBING HEAD ADAPTER FLANGE. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 3 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL(78.35usft(above Mean Sea Level) Date From-To 1 Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 BOPSUR P PRE WELL HEAD WORK,CLEAN AND INSPECT WELL HEAD,WORK ALL LOCK DOWNS AND INSURE CORRECT OPERATION,LOCK DOWNS,3 1/4"IN-4 1/8"OUT,ALIGNMENT PIN 4"OUT/3 1/4"IN,INSTALL 4.5"IF BOX-5.875 ACME PIN X-OVER SUB&VERIFY#OF TURNS 17 3/4 TURNS TO THE RIGHT,INSTALL -BLANKING DART ASSEMBLY,SIMOPS, ADJUST SPACER SPOOL TO ASSURE BOP HEIGHT. 2/11/2013 00:00 - 06:00 6.00 BOPSUR P PRE ,NIPPLE UP 13-5/8"RISER SPACER SPOOLS. 06:00 - 10:30 4.50 BOPSUR P PRE IPPLE UP 13-5/8"5M SHAFFER BOP STACK FROM TOP TO BOTTOM AS FOLLOWS(SEE ATTACHED STACK DIAGRAM). RIGUP FLOW RISER,AIR BOOTS AND HOLE FILL LINE. 13-5/8"SHAFFER SPHERICAL BOLTED COVER ANNULAR PREVENTER -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS -13-5/8"5K SHAFFER LXT BLIND-SHEAR RAMS -MUD CROSS WITH 3-1/8"INNER MANUAL GATE VALVES AND OUTER 3-1/8"HCR VALVES ON BOTH CHOKE AND KILLS LINES. -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS. 10:30 - 11:30 1.00 RIGU P PRE HOLD RIG EVACUATION DRILL AND AFTER ACTION REVIEW WITH ALL PERSONNEL ONSITE. COMPLETE PRE-SPUD MEETING WITH SECOND CREW. 11:30 - 12:00 0.50 RIGU I P PRE SECURE BOP STACK WITH TURN BUCKLES AND RIGUP FLOWLINE. 12:00 - 18:30 6.50 BOPSUR P PRE OPEN ALL DOORS ON BOP STACK WSL VISUALLY INSPECT ALL RAM ELEMENTS. ELECT TO REBULD UPPER VBRS AND BLIND-SHEAR RAMS. LOWER VBRS ARE ACCEPTABLE. 18:30 - 19:30 1.00 BOPSUR P PRE COMPLETE RIGUP OF AIR BOOTS ON FLOW NIPPLE,RIG FLOOR DRAINS,FLOW LINE SLEEVES,MASTER BUSHINGS AND MOUSEHOLE. 19'30 - 20:30 1.00 BOPSUR P PRE RUN IN HOLE WITH 3-1/2"TEST JOINT ASSEMBLY AND MAKEUP TO TUBING HANGER. WSL PERFORMS VISUAL INSPECTION OF ANNULAR PREVENTER FROM RIG FLOOR(ACCEPTABLE). FILL LINES AND BOP STACK Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 4 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:OOAM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20.30 - 00:00 3.50 BOPSUR P PRE PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH PER AOGCC REGULATIONS AND IN �� CONFORMANCE WITH ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED / BYAOGCC REPRESENTATIVE CHUCK ' SCHIEVE. -PRESSURE UP FOR INITIAL SHELL TEST AND OBSERVE LEAKING GLAND NUT ON TUBING SPOOL. TIGHTEN SAME PRIOR TO RESUMING TESTING. DETAILS OF TEST IN TIME SUMMARY FOR 2/12/2013 WHEN TEST COMPLETE LOAD PITS WITH HEATED 9.8 PPG BRINE IN PREPARATION FOR WELL CIRC OUT. 2/12/2013 00:00 - 06:00 6.00 BOPSUR P PRE PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH PER AOGCC REGULATIONS AND IN CONFORMANCE WITH ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BYAOGCC REPRESENTATIVE CHUCK SCHIEVE. -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED. -ANNULAR TESTED WITH 3-1/2"TEST JOINT. -VBRS TESTED WITH 3-1/2"AND 4-1/2"TEST JOINTS. -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED -HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. -14 N2 BOTTLES AVERAGE PRESSURE=2170 PSI -H2S AND LEL GAS ALARMS CALIBRATED AND TESTED. -BOP COMPONENTS FUNCTIONED FROM ALL THREE CONTROL PANELS: RIG MANAGER'S OFFICE,LER,ACCUMULATOR 06:00 - 07:00 1.00 BOPSUR P PRE RIG DOWN AFTER BOPE TESTING. 07:00 - 08:00 1.00 WHSUR P DECOMP CAMERON REPRESENTATIVE ON LOCATION TO PULL'K'PLUG DART VALVE WITH T-BAR. 08:00 - 12:00 4.00 WHSUR P DECOMP RIGUP DUTCH RISER ASSEMBLY AND SECURE SAME IN ANNULAR PREVENTER. MIRU VALVE SHOP LUBRICATOR. 12:00 - 21:30 9.50 WHSUR N HMAN DECOMP UNABLE TO PRESSURE TEST LUBRICATOR TO PLANNED 3500 PSI BECAUSE TEST DART HAS BEEN PULLED. UNSUCCESSFULLY MAKE SEVERAL ATTEMPTS TO RE-SET TEST DART THROUGH DUTCH RISER AND BOP STACK WITH T-BAR. UNABLE TO EVER PRESSURE UP AGAINST TOP OF TEST DART. DECISION WITH ANCHORAGE TEAM TO PULL TEST DART AND PERFORM"ROLLING" PRESSURE TEST ON LUBRICATOR WITH FULL WELLBORE(OPS CHANGE NOTE#1). Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 5 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 WHSUR P DECOMP PRESSURE TEST VALVE SHOP LUBRICATOR TO 250 PSI LOWAND 2500 PSI HIGH (ROLLING LEAK TIGHT TEST PER "RUNNING/PULLING BPV/TWC"RP),PASSING TESTS. PULL TYPE'K'BPV. RDMO VALVE SHOP LUBRICATOR CREW. CHANGE TO WELL BARRIERS: TUBING: KILL WEIGHT FLUID AND TESTED BOPE 2/13/2013 100:00 - 03:30 3.50 WHSUR N WAIT DECOMP SAFETY STANDDOWN FOR DROPPED OBJECT INVESTIGATION(DROPPED LUBRICATOR CONTROL HYDRAULIC HOSES FROM RIG FLOOR TO GROUND LEVEL, TR@CTION @4352564). 03:30 - 04:00 0.50 WHSUR N WAIT DECOMP HOLD RETURN TO WORK MEETING WITH CREWS. DISCUSS UPCOMING CIRCULATION. 04:00 - 07:30 3.50 PULL P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT AND DISPLACE WELL FROM 8.4 PPG SEAWATER TO 9.8 PPG BRINE AS FOLLOWS: LINE UP ALL RETURNS TO FLOWBACK TANK. REVERSE 40 BBLS 140°F 9.8 PPG BRINE DOWN IA;210 GPM,1175 PSI. LINE UP DOWN TUBING. PUMP 78 BBLS 9.8 PPG BRINE DEEP CLEAN PILL FOLLOWED BY FULL WELL DISPLACEMENT OF 546 BBLS;320-420 GPM, 1600-1700 PSI. MONITOR WELL FOR TEN MINUTES AFTER SHUTTING DOWN PUMPS. WELL IS STATIC. BLEED OFF OA PRESSURE FROM 1500 PSI TO 0 PSI ONCE DURING CIRCULATION NOTE: WELLHEAD WRAPPED IN HERCULITE AND STEAM APPLID TO WELLHEAD IN PREPARATION FOR PULLING TUBING HANGER. 07:30 - 09:00 1.50 PULL P DECOMP LOAD TOOLS TO RIG FLOOR AND RIG UP FOR PULLING 4-1/2"PRODUCTION TUBING. RIG UP SCHLUMBERGER SPOOLING UNIT FOR CONTROL LINE. 09:00 - 11:30 2.50 PULL P DECOMP MAKEUP AND RUN IN HOLE WITH BAKER ITCO SPEAR ASSEMBLY(BHA OAL=17'). USING SPEAR FOR TWO PART HANGER. MAKEUP TO JOINT OF DRILLPIPE MU SPEAR ASSEMBLY,RUN IN HOLE TO 56'DOWN ON JOINT#2. PU TO 45 KLBS TO ENSURE SPEAR IS ENGAGED. CAMERON REPRESENTATIVES ON LOCATION TO BACKOUT LOCK DOWN SCREWS. 11:30 - 12:30 1.00 PULL P DECOMP UNSEAT TUBING HANGER AT 125 KLBS PICKUP WEIGHT AND PULL TO RIG FLOOR. PICKUP WEIGHT OF TUBING STRING FROM 7787'MD IN 9.8 PPG BRINE=115 KLBS COMPARED TO 118 KLBS EXPECTED. PARTIALLY CATCH AND DISLODGE FLOW NIPPLE WHILE PULLING HANGER ABOVE BOP STACK. 12:30 - 13:30 1.00 PULL N HMAN DECOMP ADJUST FLOW NIPPLE AND AIR BOOTS. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 6 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL t 78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:00 0.50 PULL P DECOMP FLOWCHECK WELL FOR 10 MINUTES(WELL STATIC). LAYDOWN SPEAR ASSEMBLY. LAYDOWN GRAY GEN 2'T2S'13-5/8"X 5-1/2"X 5-7/8"TUBING HANGER AND(2)HANGER PUPS. 14:00 - 18:00 4.00 PULL P DECOMP PULL OUT OF HOLE AND LAYDOWN 4-1/2", 12.6#,L-80,TDS PRODUCTION TUBING FROM 7787'MD TO 5500'MD,SPOOLING SINGLE 1/4" CONTROL LINE. CUTOFF CONTROL LINE AND LAYDOWN HES SERIES 10 TRSSSV. TOTAL STAINLESS STEEL BANDS RECOVERED=30 (EXPECTED 31). 18:00 - 21:30 3.50 PULL P DECOMP PULL OUT OF HOLE AND LAYDOWN 4-1/2" PRODUCTION TUBING FROM 5500'MD TO 1547'MD(AVERAGING-25 JTS/HR). 21:30 - 22:00 0.50 PULL P DECOMP HOLD UNANNOUNCED KICK WHILE TRIPPING (D1)DRILLAND AFTER ACTION REVIEW WITH CREW(MANIPULATE FLOW PADDLE AND FLOAT IN TRIP-TANK). -ALARMS PROPERLY CATCH SIMULATED INFLUX AND ALL CREWMEMBERS PROPERLY RESPOND. 22:00 - 00:00 2.00 PULL r P DECOMP PULL OUT OF HOLE AND LAYDOWN REMAINDER OF 4-1/2'PRODUCTION TUBING FROM 200 1547LL'MD TO CFUJOINTS RECOVERED -2 CAMCO 4-1/2"X 1-1/2"GLMS WITH(2)10' PUPS ON EACH -CUT JOINT=3.60'. FLARE OD=5.1". CUT CONDITION=GOOD. 2/14/2013 00:00 - 02:00 2.00 PULL P DECOMP RIG DOWN AFTER LAYING DOWN 4-1/2" PRODUCTION TUBING. CLEAN AND CLEAR RIG FLOOR. MONITOR WELL BY CIRCULATING OVER TOP(STATIC). 02:00 - 03:30 1.50 CLEAN P DECOMP LOAD TOOLS FOR 9-5/8"CLEANOUT BHA TO RIG FLOOR. SLB MWD CALIBRATE SURFACE EQUIPMENT. 03:30 - 04 30 1.00 CLEAN P DECOMP HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL AND AFTER ACTION REVIEW WITH RIG CREW(MANIPULATION OF FLOW PADDLE WHILE OUT OF THE HOLE). -DISCUSS SCENARIO FOR RIG CREWS IN SECURING WELL WITH NO PIPE IN HOLE, WITH ASSISTANT DRILLER ON BRAKE AND WITH RIG CREWMEMBERS WORKING ON VARIOUS OTHER TASKS AWAY FROM RIG FLOOR. 04:30 - 05:30 1.00 CLEAN P DECOMP COMPLETE LOADING TOOLS TO RIG FLOOR FOR CLEANOUT RUN. 05:30 - 12:30 7.00 WHSUR N HMAN DECOMP WARMUP COLD LOCKDOWN SCREWS. UNSUCCESSFULLY ATTEMPT TO INSTALL INCORRECT WEAR BUSHING(13-1/2"OD, ,8-11/16"ID,1.3'LONG). PULL WEAR BUSHING AND RUN CORRECT WEAR BUSHING IN HOLE. DAMAGE WEAR BUSHING WHILE RUNNING IN LOCKDOWN SCREWS. PULL WEAR BUSHING,WAIT ONE HOUR ON REPLACEMENT FROM TOOL SERVICE. BUILD TWO STANDS 4"DRILLPIPE WITH OFFLINE STAND BUILDER. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 7 of 43 Operation Summary Reports _ � Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.2/8/2013 End Date.3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL Q78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 13:00 0.50 VVHSUR P DECOMP INSTALL WEAR BUSHING,ID=8-7/8". RUN IN FOUR LOCKDOWN SCREWS 3-3/4"TO SECURE. 13:00 - 15:30 2.50 CLEAN P DECOMP MAKEUP AND RUN IN HOLE WITH 9-5/8" CLEANOUT ASSEMBLY TO BHA OVERAL LENGTH AT 344'MD. PICKUP WEIGHT WITH BHA IN HOLE=60 KLBS. j-8-1/2"USED HUGHES VM-3 ROLLER CONE I-9-5/8"CASING SCRAPER WITH PORTED FLOAT SUB -SLB ARC RESISTIVITY TOOL(FOR IDENTIFYING CASING COLLARS)WITH STABILIZER -BUMPER AND OIL JARS WITH(9)6-1/2" DRILL COLLARS 15:30 - 00:00 8.50 CLEAN P DECOMP RUN IN HOLE WITH 9-5/8"CLEANOUT ASSEMBLY FROM BHA AT 344'MD TO 4200' MD AT MIDNIGHT,PICKING UP 4"DRILLPIPE SINGLES(AVERAGING 20 JTS PER HOUR) 2/15/2013 00:00 - 10:30 10.50 CLEAN P DECOMP RUN IN HOLE WITH 9-5/8"CLEANOUT ASSEMBLY FROM 4200'MD AT MIDNIGHT TO TAG TUBING STUB AT 7811'MD(3'DEEPER THAN PLANNED 7808'MD),PICKING UP 4" DRILLPIPE SINGLES(AVERAGING 15 JTS PER I HOUR). MAKE SEVERAL PASSES WITH CASING SCRAPER ACROSS 5800' PROPOSED WHIPSTOCK SET DEPTH. NOTE: FAILED VALVE IN BOP DECK LED TO I 2-1/2 BBL FRESH WATER SPILL WITHIN RIG 1 CONTAINMENTAND ONTO DRILLSITE(SEE TR©CTION#4354238) 10:30 - 13:00 2.50 CLEAN P DECOMP CIRCULATE 35 BBL HI-VIS SWEEP SURFACE TO SURFACE WHILE RECIPROCATING STRING IN 25'INTERVAL 5'ABOVE TOP OF TUBING STUB;500-600 GPM,1800-2400 PSI. FLOWCHECK WELL PRIOR TO PULLING OFF BOTTOM(STATIC). 13'00 - 14:00 1.00 CLEAN P DECOMP TRIP OUT OF HOLE WITH 9-5/8"CLEAN OUT ASSEMBLY FROM TOP OF TUBING STUB AT 7811'MD TO PLANNED LOGGING INTERVAL START DEPTH AT 5916'MD,RACKING BACK 4" DRILLPIPE. PICKUP WEIGHT OFF BOTTOM= 144 KLBS IN 9.8 PPG BRINE. 14:00 - 18:00 4.00 EVAL P DECOMP ,LOG UP ACROSS PROPOSED WINDOW DEPTH WITH SCHLUMBERGER ARC RESISTIVITY TOOL IN MODE. (NEW TECHNOLOGY TEST FOR CASING COLLAR IDENTIFICATION)FROM 5916'MD TO 15516'MD AS FOLLOWS: TOOL SENSOR DEPTH 5900'MD-5700'MD AT 100 FPH TOOL SENSOR DEPTH 5700'MD-5600'MD AT 200 FPH TOOL SENSOR DEPTH 5600'MD-5500'MD AT 400 FPH BUILD 10 STANDS 4"DRILLPIPE WITH OFFLINE STAND BUILDER. Printed 4/9/2013 10.25:17AM North America-ALASKA-BP Page 8 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay ' Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:30 2.50 CLEAN P DECOMP TRIP OUT OF HOLE WITH 9-5/8"CLEANOUT ASSEMBLY FROM TOP OF LOGGING DEPTH AT 5516'MD TO BHAAT 340'MD,RACKING BACK 4"DRILLPIPE. FLOW CHECK WELL PRIOR TO PULLING BHA THROUGH STATIC (STATIC). _ 20:30 - 23:00 2.50 CLEAN P DECOMP RACK BACK THREE STANDS OF 6-1/2"DRILL 'COLLARS. LAYDOWN SLB ARC RESISTIVITY TOOL AND CLEANOUT ASSEMBLY. GRADE 8-1/2"VM-3 ROLLERCONE BIT 1-1,IN GAUGE. SCHLUMBERGER DOWNLOAD ARC RESISITIVITY TOOL DATA AND SEND OFF TO SCHLUMBERGER PETROPHYSICIST FOR PROCESSING. 23:00 - 23:30 0.50 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR AFTER TRIPPING. 23:30 - 00:00 0.50 EVAL P DECOMP MIRU SCHLUMBERGER E-LINE UNIT 2266. 2/16/2013 00:00 - 03:30 3.50 EVAL P 'DECOMP LOAD E-LINE TOOLS TO RIG FLOOR. RIG UP LINE WIPER AT RIG FLOOR FOR E-LINE,NO OTHER PRESSURE CONTROL REQUIRED PER CRT-AK-10-10:5.3.7. MAKEUP CEMENT EVALUATION,GAMMA RAY AND CASING COLLAR LOCATOR TOOLSTRING. 03:30 - 06:00 2.50 EVAL P DECOMP RUN IN HOLE WITH LOGGING TOOLSTRING FROM SURFACE TO LOGGING START DEPTH AT 5900'MD. 06:00 - 12:00 6.00 EVAL P DECOMP LOG UP FROM 5900'MD TO SURFACE WITH USIT/CBUVDUGR/CCLTOOLS IN HIGH RESOLUTION MODE. MAKE SECOND FULL PASS OVER 5900'TO 4500'MD INTERVAL DUE TO ANOMALIES AT 5090'MD,4850'MD,& 4700'MD IN FIRST PASS. -BP PETROPHYSICIST EVALUATION OF TOC =2000'MD MONITOR WELL WITH CONTINUOUS HOLE FILL DURING LOGGING OPS(STATIC) 12.00 - 14:30 : 2.50 EVAL P DECOMP !LAYDOWN USIT/GR/CCL TOOLS. MAKEUP 9-5/8"HES BRIDGE PLUG TOOLSTRING. 14.30 - 18:00 3.50 PXA P DECOMP RUN IN HOLE WITH 8-5/8",47#HES EZSV BRIDGE PLUG. LOCATE CASING COLLAR AT lY/ 7699'ELMD. SET EZSV WITH TOP OF PLUG AT 7708'ELMD. AFTER RELEASING FROM PLUG,SET DOWN WITH E-LINE TO CONFIRM SET. PULL OUT OF HOLE TO SURFACE WITH E-LINE. -DRILLPIPE TAG ON 2/17/2013=7698'MD EZSV WILL BE USED TO SUPPORT PERMANENT WELLBORE ABANDOMENT BALANCED CEMENT PLUG. BUILD 26 STANDS WITH OFFLINE STANDBUILDER DURING WIRELINE OPS (AVERAGE 8 STANDS PER HOUR). NOTE: 'ALL DRILLPIPE REQUIRED FOR WELL TOTAL DEPTH IS NOW RACKED BACK. 18:00 - 19:00 1.00 PXA P DECOMP LOWER E-LINE TOOLS OFF RIG FLOOR. RDMO SCHLUMBERGER E-LINE UNIT. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 9 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:OOAM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 PXA P DECOMP MIRU DOYON CASING SERVICES. RIG UP FOR RUNNING 3-1/2"NSCT TUBING AS CEMENTING ASSEMBLY. HOLD PRE-JOB SAFETY MEETING FOR RUNNING TUBING. 21:00 - 00:00 3.00 • PXA P DECOMP j PICKUP AND RUN IN HOLE WITH 3-1/2",9.2#, L-80,NSCT TUBING JOINTS(CEMENT STINGER)FROM SURFACE TO BHA OVERALL LENGTH 1544'AT MIDNIGHT(AVERAGE 22-24 JOINTS/HOUR). MAKEUP TORQUE=2890 FT-LBS. BHA PU WEIGHT=44 KLBS. -10'MULE SHOE STINGER ON END OF TUBING. 2/17/2013 00:00 - 08:30 8.50 PXA P DECOMP TRIP IN HOLE WITH CEMENTING ASSEMBLY ON 4"DRILLPIPE OUT OF DERRICK FROM 1544'MD AT MIDNIGHT TO TAG 9-5/8"HES EZSV AT 7698'MD,6770'TVD(E-LINE SET DEPTH WAS 7708'ELMD). SET DOWN 15 KLBS TO WEIGHT TEST EZSV. HOLD MANDOWN AND KICK WHILE TRIPPING (D1)DRILLS MIRU SCHLUMBERGER CEMENTING UNIT. HOLD JOB PLANNING MEETING. 08:30 - 09:30 1.00 PXA P DECOMP HOLD PRE-JOB SAFETY MEETING AND RIG UP FOR DISPLACEMENT. 09:30 - 11:00 1.50 PXA P DECOMP PUMP 40 BBL HI-VIS 8.5 PPG SWEEP AND CHASE WITH SEAWATER TO DISPLACE WELL 'FROM 9.8 PPG BRINE TO 8.5 PPG SEAWATER (IN PREPARATION FOR NEGATIVE PRESSURE TEST FOLLOWING CEMENT JOB);500 GPM. FLOWCHECK WELL AFTER DISPLACEMENT (STATIC). 11:00 12:30 1.50 PXA P DECOMP RIG UP CEMENTING EQUIPMENT ON RIG FLOOR. INSTALL SPACEOUT 4"DP PUP, FOSV,AND HEAD PIN AND PLUG VALVE FOR CEMENT LINE. BLOWDOWN LOW PRESSURE AND HIGH PRESSURE LINES TO CEMENTERS TO CONFIRM LINES CLEAR. HOLD PRE-JOB SAFETY MEETING WITH ALL PERSONNEL ON LOCATION. 12:30 - 13:00 0.50 PXA P DECOMP SERVICE AND LUBRICATE TOP DRIVE, DRAWWORKSAND IRON ROUGHNECK 13:00 - 15:15 2.25 PXA P DECOMP COMPLETE RIGUP FOR CEMENTING. LINEUP CEMENTERS DOWN WELL. PUMP 10 BBLS 8.4 PPG FRESH WATER TO WARM LINES. SHUT IN FOSV AND PRESSURE TEST CEMENTING LINES TO 250 PSI LOW(PASS). WARM LINES WITH ADDITIONAL BBLS. TEST CEMENTING LINES TO 3000 PSI HIGH FOR FIVE MIN PER LEAKTIGHT CRITERIA(PASS). 14:45-15:15: SLB BATCH UP 74 BBLS CEMENT Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 10 of 43;. Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date.3/18/20131X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:OOAM Rig Release:3/26/2013 Rig Contractor.PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:15 - 16:30 1.25 PXA P DECOMP SCHLUMBERGER PUMP 74 BBLS 15.8 PPG _CLASS G CEMENT+ADDITIVES AT 5 BPM,600 PSI. SLB DISPLA(.t(.tMENT WITH 48 BBLS 8.5 PPG SEAWATER AT 5 BPM,200 PSI,THEN FINAL 20 BBLS 8.5 PPG SEAWATER AT 2 BPM, 50 PSI TO PLACE CEMENT ON BACKSIDE AT 1 BALANCE POINT MINUS 3 BBLS. SHUT DOWN PUMPS AND CLOSE FOSV. BLOWDOWN AND RIG DOWN CEMENTING LINES AT RIG FLOOR. CRACK OPEN FOSV,ALLOW CEMENT TO U-TUBE. 2.5 BBLS RETURNED TO PITS WHEN WELL IN BALANCE. WET SAMPLE OF CEMENT SENT TO SLB FOR UCA ANALYSIS. CEMENT VERIFICATION NOTES: -ABANDONMENT CEMENT PLUG IN PLACE AT 116:00 ON 2/17/2013 -TOP OF CEMENT ESTIMATED AT 6698'MD, 6027 TVD(1000'MD,743'ND COLUMN) -TOP OF WELL BARRIER ELEMENT IN AND OUTSIDE 9-5/8"CASING=7082'MD -GREATER THAN 90%OF CEMENT MIXED WITHIN 0.25 PPG OF PLANNED DENSITY(SLB DENSOMETER) -LABORATORY TESTING OF JOB CEMENT SAMPLE SHOWS 200 PSI COMPREESIVE STRENGTH AT 5.5 HOURS 16.30 - 19 00 2.50 PXA P DECOMP PULL OUT OF HOLE WITH CEMENTING ASSEMBLY AT 3 MIN/STAND FROM EZSV AT 7698'MD TO 6450'MD SAFETY(248'ABOVE CALCULATED TOC). PIPE PULLS DRY, INDICATING REMAINING CEMENT IN PIPE IS FALLING OUT AND COMPLETING BALANCED PLUG. PICKUP WEIGHT OFF BOTTOM=124 KLBS,SLACKOFF=115 KLBS. 19'00 - 21'30 2.50 PXA P DECOMP DROP 5"FOAM DRILLPIPE WIPER BALL AND CIRCULATE SURFACE TO SURFACE PLUS EXTRA BOTTOMS UP;500-630 GPM,1350-1950 PSI. OBSERVE CEMENT-CONTAMINATED SEAWATER AT FIRST BOTTOMS UP INDICATING EFFECTIVE DRILLPIPE WIPE, THOUGH WIPER BALL DOES NOT RETURN TO SURFACE. CIRCULATE ADDITIONAL SURFACE TO SURFACE VOLUME;630 GPM, 1950 PSI. MW IN/OUT=8.6 PPG. MONITOR WELL PRIOR TO PULLING OUT OF HOLE i(STATIC). 21:30 - 00:00 2.50 PXA P DECOMP SLIP AND CUT 83'(10 WRAPS)1-3/8"DRILL LINE. NO BAD SPOTS IN LINE OBSERVED. 1-INSTALL FOSVAND RUN IN ONE JOINT !BELOW ROTARY TABLE. MONITOR WELL WITH CONTINUOUS HOLE FILL(STATIC) 2/18/2013 00 00 - 01:30 1.50 PXA P DECOMP COMPLETE SLIP AND CUT OF DRILL LINE. CALIBRATE BLOCKS. PULL FOSV FROM DRILLSTRING. 01:30 - 06:00 4.50 PXA P DECOMP PULL OUT OF HOLE WITH CEMENTING ASSEMBLY FROM 6450'MD(SAFETY DEPTH ABOVE TOP OF CEMENT PLUG)TO CEMENT STINGER BHA AT 1544'MD,RACKING BACK 4" DRILLPIPE. Printed 4/9/2013 10.25:17AM North America-ALASKA-BP Page 11 of 431 Operation Summary Report Common Wet Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-158 ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 06:00 - 06:30 0.50 PXA P DECOMP FLOWCHECK WELL PRIOR TO PULLING BHA THROUGH STACK HOLD PRE-JOB SAFETY MEETING FOR LAYING DOWN 3-1/2"TUBING STINGER(DOYON CASING SERVICES STILL RIGGED UP FROM DAY BEFORE). 06:30 - 10:30 4.00 PXA P DECOMP PULL OUT OF HOLE AND LAYDOWN 49 JOINTS 3-1/2",9.2#,L-80,NSCT GRADE B TUBING USED AS CEMENT STINGER. 10:30 - 11:00 0.50 PXA P DECOMP RDMO DOYON CASING SERVICES. CLEAN AND CLEAR RIG FLOOR AFTER TRIPPING. 11:00 - 11:30 0.50 PXA P DECOMP RIG UP TO PRESSURE TEST 9-5/8"CASING AND CEMENT ABANDONMENT PLUG. 11:30 - 13:00 1.50 PXA N RREP DECOMP DISCOVER LEAK IN KILL LINE. REPLACE RUBBER GASKET IN HAMMER UNION CONNECTION. CHANGEOUT RUBBER GASKET. PRESSURE UP FOR FIRST TEST AND MUD PUMP POPOFFS RELEASE AT 3600 PSI. RESET POPOFFS. 13:00 - 15:30 2.50 PXA P DECOMP VERIFY ABANDONMENT OF 02-15A WELLBORE AS FOLLOWS: -POSITIVE PRESSURE TEST: CLOSE BLIND RAMS AND PRESSURE TEST 9-5/8"CASING+ ,CEMENT PLUG TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS) -NEGATIVE PRESSURE TEST: OPEN WELL. OBSERVE NO FLOW FOR 15 MINUTES. LINEUP TO PRESSURE GAUGE AND OBSERVE NO PRESSURE BUILDUP FOR 15 I MINUTES(PASSING TESTS). SEE ATTACHED DOCUMENTATION(ON 2/17/2013 DAILY REPORT)FOR BOTH TESTS. AUTHORIZATION TO PROCEED RECEIVED FROM WELLS TEAM LEADER. -TOP OF WELL BARRIER ELEMENT IN AND OUTSIDE 9-5/8"CASING=7082'MD 15:30 - 18:00 2.50 STWHIP P DECOMP MIRU SCHLUMBERGER E-LINE UNIT 2266. LOAD TOOLS TO RIG FLOOR. RIG UP LINE WIPER,NO LUBRICATOR. MONITOR WELL THROUGHOUT E-LINE OPERATIONS WITH J CONTINUOUS HOLE FILL. /v/ 18:00 - 22:30 4.50 STWHIP P DECOMP RUN IN HOLE WITH 9-5/8",47#HES EZSV BRIDGE PLUG. TIE-IN TO PRIMARY DEPTH CONTROL LOG DATED MAY 2011 AND LOCATE CASING COLLAR AT 5812'ELMD. SET EZSV WITH TOP OF PLUG AT 5807'ELMD,PLUG LENGTH=3'. AFTER RELEASING FROM PLUG,SLACK OFF WITH E-LINE TO CONFIRM SET. PULL OUT OF HOLE TO SURFACE WITH E-LINE. EZSV WILL BE USED TO SUPPORT 9-5/8" CASED HOLE SIDETRACK WHIPSTOCK 22:30 - 23:00 0.50 STWHIP P DECOMP RDMO SCHLUMBERGER E-LINE UNIT. 23:00 - 00:00 1.00 WHSUR P DECOMP LOAD CASING CUTTER TOOLS TO RIG FLOOR. 2/19/2013 00:00 - 01:00 1.00 WHSUR P DECOMP MAKEUP BAKER 8-1/4"MULTI-STRING 1 CUTTER AND RUN IN HOLE TO BHA OVERALL 1 LENGTH OF 15'MD. 1-8-1/4"MECHANICAL CUTTER FOR 9-5/8" CASING AND 8-1/2"STABILIZER Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 12 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 05:00 4.00 WHSUR P DECOMP !RUN IN HOLE WITH 8-1/4"MULTI-STRING MECHANICAL CASING CUTTER ASSEMBLY ON 4"DRILLPIPE STANDS FROM BHA AT 15'MD TO 3807'MD. STACK WEIGHT DOWN AND UNABLE TO PROCEED FURTHER. DETERMINE CUTTING BLADES ON MECHANICAL CUTTER OPENED EARLY. DECISION WITH ODE TO PULL OUT OF HOLE. FLOWCHECK WELL PRIOR TO PULLING OUT OF HOLE(STATIC). 05:00 - 07:30 2.50 WHSUR N DFAL 3,807.00 DECOMP PULL OUT OF HOLE WITH 8-1/4"MECHANICAL CUTTER ASSEMBLY FROM 3807'MD TO BHA AT 15'MD. FLOWCHECK WELL PRIOR TO PULLING BHA THROUGH BOP STACK —.- (STATIC). 07:30 - 08:00 0.50 WHSUR N DFAL 3,807.00 DECOMP LAYDOWN 8-1/4"MECHANICAL CUTTER ASSEMBLY(PARTIAL DAMAGE NOTED ON SEVERAL CUTTER BLADES). 08:00 - 11:00 3.00 BOPSUR P DECOMP RIG UP TO PRESSURE TEST BOPE.PULL WEAR BUSHING 11:00 - 22:00 11.00 BOPSUR P DECOMP PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH PER AOGCC REGULATIONS AND IN CONFORMANCE WITH ADWOP STANDARDS. AOGCC REPRESENTATIVE JOHN CRISP ON Q^�i LOCATION TO WITNESS BOP TEST.-ALL YI/ BOPE TEST CHARTS AND REPORT ARE ATTACHED.-ANNULAR TESTED WITH 3-1/2" TEST JOINT.-VBRS TESTED WITH 3-1/2"AND /11 4-1/2"TEST JOINTS.-(2)HT38 FOSVS,(1) 4-1/2"IF FOSV,&(1)HT38 DART VALVE TESTED.-CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED-HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE.- 14 N2 BOTTLES AVERAGE PRESSURE=2170 PSI-H2S AND LEL GAS ALARMS CALIBRATED AND TESTED.-BOP COMPONENTS FUNCTIONED FROM ALL THREE CONTROL PANELS: RIG MANAGER'S OFFICE,LER, ACCUMULATOR.BOP TEST WAS WITTNESSED BY STATE INSPECTOR(JOHN CRISP)FOUND 4 PASS/FAIL ITEMS ON THE TEST 1.AIR PUMPS ON THE KOOMEY UNIT NEED TO BE TURNED UP SO THAT THEY WILL PUMP THE SYSTEM UP TO 2900 PSI.PUMPS ARE SET AT 2500 NOW. 2.PRESSURE GAUGE ON THE CHOKE MANIFOLD NEEDS REPAIR (BAD BATTERY).3.UPPER VALVE HAD TO BE FUNCTIONED.4.GLAND NUT ON WELL HEAD WAS LEAKING • 22:00 - 23:30 1.50 BOPSUR P DECOMP RIG DOWN PRESSURE TEST.INSTALL WEAR BUSHING 23:30 - 00:00 0.50 WHSUR N DFAL 3,807.00 DECOMP P/U 9 5/8 CSG CUTTER BHAAS PER BAKER. BAKER INSTALLED NEW KNIVES. 2/20/2013 00:00 - 06:00 6.00 WHSUR N DFAL 5,832.00 DECOMP TIH W/9 5/8 CASING CUTTER,TAG EZSV PLUG AT 5832,SET 5K ON PLUG TO VERIFY, MONITOR WELL VIA TRIP TANK 06:00 - 09:00 3.00 WHSUR P DECOMP MONITOR WELL FOR 10 MIN=STATIC,PJSM, DISPLACE WELL TO 9.8 BRINE 48/BPM Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 13 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: - Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date J From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:00 1.00 WHSUR P DECOMP TAG EZSV AND SET 25K TO CONFIRM WHIPSTOCK WILL HOLD,P/U TO LOCATE NEXT 9 5/8 COLLAR ABOVE PLUG@5798 10:00 - 11:30 1.50 WHSUR P DECOMP TOH F/5798'MD TO/3051'P/U,WT=77K S/O, WT=77K,MONITOR WELL VIA TRIP TANK 11:30 - 12:00 0.50 WHSUR P DECOMP RIG SERVICE 12:00 - 13:30 1.50 WHSUR P DECOMP JTOH F/3051'MD TO/2007 MONITOR WELL VIA TRIP TANK,P/U WT=77K S/0 WT=70K 13:30 - 14:00 0.50 WHSUR P DECOMP M/U TO STD 22,P/U WT=60K S/0 WT=66K, PICK UP TO 2070'MD AND BREAK CIRC @ 4.5 BPM 340 PSI AND LOCATE LOWER COLLAR@2079'MD, 14:00 - 15:00 1.00 WHSUR P DECOMP SHUT DN PUMP,P/U TO 2030'MD,PUMP @ 4.5 BPM 340 PSI AND LOCATE 2 ND COLLAR @ 2036'MD,P/U TO 2006',RACK BACK STD 22 AND PICK UP SINGLE JOINT,SLACK OFF TO 2006'MD 15:00 - 15:30 0.50 WHSUR P 'DECOMP PJSM W/CREW FOR CUT AND DISPLACEMENT.BLOW AIR THROUGH HARD LINE TO TIGER TANK,CHECK VALVE ALIGNMENT 15:30 - 16:00 0.50 WHSUR P DECOMP CUT 9 5/8 CSG @ 2006'MD,ROT@80 RPM WT 64K,TQ 2K W/PUMP OFF.BREAK CIRC@4.5 BPM 300 PSI,INCREASE PSI TO 900PSI,6.5 BPM TQ 3K,AFTER 10 MIN SAW 50 PSI DECREASE STAND PIPE PSI AND 300 ON OA. CONT CUT FOR 5 MIN,TD STALLED OUT/SHUT DN PUMP.BLEED OFF PSI AND RELEASED TQ ON TD,P/U 1'WITH 30K OVERPULLTO FREE,CIRC©4.5 BPM 315 PSI, S/O AND SET DN 10K TO VERIFY CUT 16:00 - 18:30 2.50 WHSUR P DECOMP CLOSE ANNULAR AND OPEN OA TO OPEN TOP TANK, PUMP 2BBL TO VERIFY FLOW THROUGH OA,OPEN ANNULAR AND PUMP 22 BBL OF 95 DEG DIESEL.CLOSE ANNULAR AND PUMP 28BBL DISEL FOLLOWED BY 22 BBL OF DEEP CLEAN PILL,DISPLACE DP WITH 22 BBLS OF 9.8 BRINE,SHUT DN PUMP AND ALLOW TO SOAK FOR 1 HOUR 18:30 - 20:30 2.00 WHSUR P DECOMP PUMP 290 BBL 9.8 BRINE THROUGH OA, RETURNS TO OPEN TOP TANK 20:30 - 22:30 2.00 WHSUR P DECOMP MONITOR WELL,PRESSURE 0 ON DP AND OA,OPEN ANNULAR AND CIRC BOTTOMS UP TO CLEAR MIGRATED DIESEL.DUMP 80 BBLS. 22:30 - 00:00 1.50 WHSUR P DECOMP PJSM,MONITOR WELL FOR 10 MIN=STATIC, UD SINGLE JOINT DP,BLOW DN KILL LINE AND TOP DRIVE,TOH TO LAY DN CASING _ CUTTER,MONITOR WELL VIA TRIP TANK. 2/21/2013 00:00 - 01:30 1.50 WHSUR P DECOMP PJSM,MONITOR WELL FOR 10 MIN,LAY DN CASING CUTTER ASSEMBLY, 01:30 - 04:00 2.50 WHSUR P DECOMP CHANGE OUT RAMS FOR 9 5/8 CASING RAMS,TEST RAMS LOW 350,HIGH 3500, 04:00 - 05:30 1.50 WHSUR P DECOMP RIG DN TEST EQUIP,MAKE UP 9 5/8 CASING SPEAR.RIH ON DOUBLE DRILL PIPE 05:30 - 09:00 3.50 WHSUR N SFAL DECOMP REPAIR STRIPPED GLAND NUT ON WELL HEAD,CAMERON TAP AND CHASE THREADS, RIG UP 13 5/8 POWER TONGS AND PS-21 SLIPS. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 14 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:00 1.00 WHSUR P DECOMP ENGAGE SPEAR AND PULL HANGER FREE FROM WELL HEAD @273K HOOKLOAD.PULL HANGER THROUGH ROTARY TABLE AND ATTEMPT TO CIRC THROUGH SPEAR, UNABLE TO ENGAUGE PRESSURE CUP. 10:00 - 11:00 1.00 WHSUR P DECOMP SET CASING IN SLIPS,RELEASE SPEAR FROM HANGER,BREAK OUT HANGER PUP JOINT. 11:00 - 11:30 0.50 WHSUR P DECOMP INSTALL CIRC SUB IN 9 5/8 CASING AND CIRC BOTTOMS UP,INSTALL BX ELEVATOR INSERTS 11:30 - 12:00 0.50 WHSUR P DECOMP CLEAR RIG FLOOR AND INSTALL PS-21 12:00 - 18:00 6.00 WHSUR P DECOMP LAY DOWN 46 JTS+4 CUT JOINT,10 BOW SPRING CENTRILIZERS,CUT JOINT 14'.01" 18:00 - 19:30 1.50 WHSUR P DECOMP RD/CASING EQUIPMENT AND INSTALL MASTER BUSHING,CLEAN AND CLEAR RIG FLOOR OF ARCTIC PACK 19:30 - 20:00 0.50 WHSUR P DECOMP RIG SERVICE,CHANGE CHANGE FILTERS ON TD, 20:00 - 21:00 1.00 WHSUR P 'DECOMP PJSM,CHANGE RAMS FROM 9 5/8 TO 2 7/8 X 51/2,M/U TEST JOINT 21:00 - 00:00 3.00 WHSUR P DECOMP INSTALL TEST PLUG,LEAKING BY RUBBER, CHANGE OUT TEST PLUG,GLAND NUT ON WELL HEAD LEAKING,TIGHTEN,TEST RAMS 350 LOW 5MIN,3500 HIGH 5MIN,SIMOPS- MAKE UP SAFETY JOINT FOR PICK UP BHA, 2/22/2013 00:00 - 02:00 2.00 WHSUR- P DECOMP LAY/DN 9 5/8 CASING HANDLING EQUIPMENT CLEAR AND CLEAN FLOOR 02:00 - 04:00 2.00 WHSUR P DECOMP PJSM,P/U 9 5/8 CASING DRESS OFF BHA 04:00 - 05:00 1.00 WHSUR P DECOMP TIH T/1000 FT,MONITOR WELL VIA TRIP TANK 05:00 - 05:30 0.50 WHSUR P DECOMP CIRC BOTTOMS UP,DUMP 20 BBLS ARCTIC PACK TO CUTTINGS BOX,PUMP 10/BPM 05:30 - 06:30 1.00 WHSUR P DECOMP TIH F/1000 MD,T/1950 MD MONITOR WELL VIA TRIP TANK 06:30 - 07:30 1.00 WHSUR P DECOMP CIRC BOTTOMS UP,DUMP ARCTIC TO CUTTINGS BOX,PUMP 10/BPM 07:30 - 10:00 2.50 WHSUR P DECOMP WASH F/1950MD,T/2006 MD @ 7 BPM,TAG FISH©2006',TAG INNER MILL,MILL AND DRESS STUB T/2007'MD@ 10/BPM,410 PSI, 60RPM,TQ 5K,WOB 6K 10:00 - 11:00 1.00 WHSUR P DECOMP CIR HI-VIS SWEEP SURFACE TO SURFACE @ 15 BPM,810 PSI 11:00 - 13:00 2.00 WHSUR P DECOMP MONITOR WELL FOR 10 MIN=STATIC,TOH, MONITOR WELL VIA TRIP TANK 13:00 - 15:30 2.50 WHSUR P DECOMP MONITOR WELL @ BHA FOR 10 MIN=STATIC, PJSM WITH BAKER,LAY DN BHA 15:30 - 17:00 1.50 WHSUR P DECOMP PRESSURE TEST 13 3/8 CASING LOW/250/5 MIN,HIGH/2000/30 MIN,TEST GOOD,OPEN BLIND AND MONITOR WELL FOR 10 MIN=STATIC TEST APPROVED BY WTL 17:00 - 21:30 4.50 WHSUR P DECOMP PJSM,DE-ENERGIZE ACCUMULATOR, NIPPLE DN BOP,BLOW DN CHOKE AND KILL LINE,PULL RISER THROUGH FLOOR AND LAY IN PIPE SHEAD 21.30 00:00 2.50 WHSUR P DECOMP PJSM WITH CAMERON,REMOVE TUBING SPOOLS FROM WELL AND LAY DN SAME. Printed 4/9/2013 10.25:17AM North America-ALASKA-BP Page 15 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-01 OHM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM 1 Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 2/23/2013 00:00 - 04:00 4.00 WHSUR N SFAL 2,006.00 DECOMP WORK ON REMOVING 13 3/8 X 20"WELL HEAD,HEAD WAS RUST LOCKED TOGETHER. 04:00 - 10:00 6.00 WHSUR P DECOMP ASSIT WACHS CUTTERS RIG UP IN WELL HOUSE AND CUT 13 3/8 INSIDE CUT AND 20" OUT SIDE CUT _ :10:00 - 14:30 4.50 WHSUR DECOMP UD 20"CUT OFF WELL HEAD AND STAGE 1 SLIPLOCK WELL HEAD,CASING SPOOL AND TUBING SPOOL IN BOP DECK,CONT TO RIG UP9 5/8 CASING EQUIPMENT. 14:30 - 22:00 7.50 WHSUR P DECOMP PJSM WEAKER AND DOYON CSG REPS,RIH WITH CASING PATCH,ES CEMENTER AND 48 JTS OF 9 5/8 CASING,TORQUE TURN TO TARGET 13000 FT/LBS OPTIMUM,JET LUBE SEAL GUARD USED ON ALL CONNECTIONS, I BAKER LOC BELOW ES CEMENTER,INSTALL ONE CENTRALIZER ON EACH OF 47 JTS, COLLARS ON CASING HANGING UP ON I _ STRAIGHT CUT ON 13 3/8 SASING. 22:00 - 23:00 1.00 WHSUR P DECOMP ENGAUGE STUMP W/CASING PATCH AS PER BAKER REP AT 2007'MD. SET WEIGHT DOWN ON STUMP TO 35K,P/U 30 K OVER STRING WT TO VERIFY ENGAUGE,P/U TO 100K OVER STRING WT,S/O TO 125K AND SET SLIPS TO RIG UP CEMENT HEAD 23:00 - 00:00 1.00 WHSUR P DECOMP RIG UP CEMENT HEAD,BLOW DOWN CEMENT LINE TO VERIFY ALL CLEAR,LINE FROZEN BETWEEN MODULES. �. 2/24/2013 00:00 - 01:30 1.50 WHSUR P DECOMP !RIG UP CMT HEAD AND BLOW DN LINES TO i 'CEMENT UNIT(CLEAR). 01:30 - 02:30 1.00 WHSUR P DECOMP TEST CASING TO 1000 PSI AND INCREMENT UP TO 1680 PSI TO SET PACKER,PRESSURE UP TO 2000 PSI AND HOLD 10 MIN,BLEED OFF PSI TO 0 AND PRESSURE UP TO 2650 TO OPEN ES CEMENTER TOOL.(ES CEMENTER SET(Q 1965.13 TOP,1967.97 BOTTOM) 02:30 - 04:00I 1.50 WHSUR P DECOMP CIRC 120 DEGREE 9.8 BRINE RETURNS TO THE CELLAR(4;5 BPM,PUMP 290 BBLS RETURN TEMP 76 DEG 04:00 - 07:00 3.00 WHSUR P DECOMP 1 PJSM W/CEMENTERS,PRESSURE TEST LINES WITH H2O PUMP 5 BBLS(LPT 300) PUMP 5 BBLS(HPT 3500),MIX AND PUMP 720 SKS OF GAS BLOCK "G"WITH 101 BBLS OF I WATER FOR TOTAL OF 150 BBLS OF SLURRY, RATE 4/6 BPM, 15.8 PPG,1.17 YIELD,DROP PLUG AND DISPLACE WITH 152 BBLS OF 9.8 BRINE,(PLUG DID NOT BUMP),SHUT IN HEAD W/571 PSI.(CIRC 30 BBLS CEMENT TO SURFACE)(END JOB CO 6:56 AM)HELD 100K OVER STRING WT THOUGHT OUT THE JOB 07.00 - 16:00 9.00 WHSUR P DECOMP WOC FOR CEMENT TO REACH REQUIRED COMPRESSIVE STRENGTH 50 PSI IN 9 HRS, 1 500 PSI 14HR,1000 PSI 18 HR,CLEAR AND CLEAN CELLAR AREA,SIMOPS BUILD 7 TOTAL 5"HWDP STDS 16:00 - 17:30 1.50 WHSUR P DECOMP BLEED OFF 500 PSI HEAD PSI,SLACK OFF 1 STRING WT,R/D CEMENT HEAD AND SUCK OUT BRINE FROM INSIDE CASING,ASSIST CAMERON WITH SET UP OF CUTTER TO CUT CASING, Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 16 of 43 Operation Summary Report Common Well Name 02-15 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project Prudhoe Bay Site:PB DS 02 Rig Name/No. PARKER 273 Spud Date/Time:6/18/1980 12:00.00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 20:00 2.50 WHSUR P DECOMP PJSM W/CAMERON REPS,CUT CASING AT APPROX.43.70'MD FROM ROTARY TABLE (NEW CASING LODS LEVEL),PJSM WITH DOYON CSG CREW,BREAK OUT CUT JOINTS AND PUPS AND LAY DN SAME. 20:00 - 00:00 4.00 WHSUR P DECOMP N/U CAMERON SLIP-LOCK WELL HEAD ON 9 5/8 CASING STUB,TEST PACK OFF TO 250 I LOW FOR 5 MIN, 2400 HIGH FOR 30 MIN, TEST GOOD 2/25/2013 00:00 - 05:00 5.00 WHSUR P DECOMP NIPPLE UP DSA AND RISER SPOOL,NIPPLE UP BOP,INSTALL BELL NIPPLE 05:00 - 06:00 1.00 WHSUR P DECOMP P/U MAKE UP 4"TEST JOINT,SET TEST PLUG, FILL STACK. 06:00 - 08:00 2.00 WHSUR P DECOMP PERFORM BODY TEST ON BOP STACK W/ANNULAR CLOSED 08:00 - 10:30 2.50 WHSUR P DECOMP RIG DOWN TEST AND PULL TEST PLUG FROM STACK 10:30 - 15:00 4.50 WHSUR ` P DECOMP P/U BHA AS PER BAKER TOOL REP,RIH TO 1829 15:00 - 17:00 2.00 WHSUR P DECOMP M/U STAND ON TD,BREAK CIRC @ 8 BPM, 340 PSI,WASH DOWN TO 1890 W NO ROTARY,CONT TO WASH DOWN TO 1906, TOOK 8 K WOB,PU 30 FT ROT 60 RPM,ROT WT 94K WASH AND REAM DN THROUGH CEMENT STRINGERS F/1877 TO 1921,MAKE TDC ON STD#12,CONT TO WASH AND REAM DN W/60 RPM F/1921 TO 1956,CBU, CONT TO CIRC AND WAIT ON ORDERS. 17:00 - 19:30 2.50 WHSUR P DECOMP WASH DN W/O ROTARY TO 1960,SET 25K WITH NO MOVEMENT,PICK UP AND SET DOWN 25K, PICK UP 5'AND ROTATE 60 RPM, CONT TO WASH AND REAM DN FROM 1955 TO 1960 W/7K WOB,INCREASE IN TD/TQ WITH NO CHANGE IN WOB,P/U AND STACK WT ON WITH OUT ROTARY TO 15K,NO MOVEMENT,ROT 60 RPM WITH 10 K WOB (CONFIRMED PLUG),SET STRING WT ON PLUG AND PUSH DOWN TO 1961,ROT WITH 4/5K WOB,P/U AND SET DOWN 40 KAND PUSH TO 1963.5,SET STRING WT ON PLUG WITH NO MOVEMENT,ROT 20 RPM 4/5K WOB,P/U AND SET STRING WT ON PLUG AND PUSH TO 1964'ROT AND DRILL OUT PLUG I WITH 4/5K WOB,ROT DN THROUGH CEMENTER WITH STRING MILL.REAM AND BACK REAM 8 TIMES WITH STRING MILL. 19 30 - 20:00 0.50 WHSUR P DECOMP CIRC FOR CASING TEST,R/U CHART RECORDER 20 00 - 21:30 1.50 WHSUR P DECOMP TEST CASING,TOP DRIVE AND KILL LINE OPEN,RAMS CLOSED,PSI BLEEDING OFF. (FAIL TEST),RETEST WITH ANNULAR CLOSED.(FAIL TEST), 21:30 - 22:30 1.00 WHSUR P DECOMP CIRC BOTTOMS UP AT 80 SPM,370 PSI,FLOW CHECK WELL FOR 10 MIN 22:30 - 00:00 1.50 WHSUR P DECOMP P/U ON PIPE OBSERVED DRAG @ 2015' COULD NOT ROTATE,PULL PIPE UP FOR 8' WITH 50K OVER PULLAND DOWN SETTING 40K,UNTIL ABLE TO ROTATE,WORK FREE, BACK REAM UP THROUGH CEMENTER. Printed 4/9/2013 10.25:17AM North America-ALASKA-BP Page 17 of 43 Operation Summary Report " - �� a Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 1X3-01OHM-C:DRILL(9,889,979.25) Project Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor.PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/26/2013 00:00 - 01:00 1.00 WHSUR P DECOMP CIRC 30 BBL HI-VIS SWEEP,12 BPM @ 790 PSI,117BBLS TOTAL UNTIL CLEAN RETURNS 01:00 - 03:00 2.00 WHSUR N SFAL 1,955.00 DECOMP TEST CASING @1955'TO 3500 PSI,TEST FAIL, RE-TEST CASING TO 3000 PSI TEST(FAIL) 03:00 - 07:00 4.00 WHSUR P DECOMP MONITOR WELL FOR 10 MIN,NO FLOW, REAM THROUGH ES CEMENTER,TIH,TAG EZSV @ 5829', CIRC HOLE @ 4 BPM,388 PSI 07:00 - 10:00 3.00 WHSUR P DECOMP SET 40K ON EZSV,PU AND CIRC HI-VIS SWEEP 6 BPM @550 PSI,CIR BOTTOMS UP 12 BPM @ 1620 PSI,CONT CIRC UNTIL CLEAN @ 15 BPM @ 2500 PSI,1428 BBLS TOTAL,15 RPM 133K WT,MUD WT IN 9.8,MUD WT OUT 9.8 10:00 - 13:00 3.00 WHSUR N SFAL 5,720.00 DECOMP TOH 2 STDS,TEST CASING @ 5720 MD 250 LO FOR 5 MIN 3500 HIGH FOR 30 MIN(PASS) 13:00 - 16:00 3.00 WHSUR P DECOMP B/D TD AND KILL LINE,MONITOR WELL FOR 10 MIN=STATIC,TOH Fl 5718 TO 881 MONITOR WELL VIA TRIP TANK PULL SLOW THROUGH ES CEMENTER,NO DRAG 16:00 - 18:30 2.50 WHSUR P DECOMP MONITOR WELL FOR 10 MIN PROIR TO PULLING BHA,PJSM W BAKER,STAND BACK 3 STDS OF 6 3/4 DC AND 6 STDS 5"HWDP, -LAY DN BHAAS PER BAKER REP 18:SO - 20:00 1.50 WHSUR P DECOMP CLEAN AND CLEAR FLOOR,FUNCTION BOP STACK AND FLUSH CLEAN,CLEAN CEMENT OUT OF BELL NIPPLE 20:00 - 21:00 1.00 BOPSUR P DECOMP PULL WEAR RING,M/U TEST JT AND INSTALL TEST PLUG,R/U TO TEST BOP,FILL ALL LINES AND PURGE AIR FROM SYSTEM 21:00 - 00:00 3.00 BOPSUR P DECOMP TEST BOP RAMS AND ANNULAR PREVENTER EQUIPMENT WITH 4"TEST JOINT TO 250 LOW FOR 5 MIN 3500 HIGH FOR 5 MIN,WITNESS BY THE STATE WAS WAIVED BY JEFF JONES ON 2/25/13 7:30 AM,CLOSING TIME FOR ANNULAR=27 SEC,UPPER RAMS=18 SEC, BLIND/SHEAR=28 SEC,LOWER RAMS=17 SEC,HCR CHOKE=2SEC,HCR KILL=2 SEC 2/27/2013 00:00 - 02:30 2.50 BOPSUR P DECOMP I TEST BOP RAMS AND ANNULAR PREVENTER EQUIPMENT WITH 4"TEST JOINT TO 250 LOW FOR 5 MIN 3500 HIGH FOR 5 MIN,WITNESS BY THE STATE WAS WAIVED BY JEFF JONES ON 2/25/13 7:30 AM,CLOSING TIME FOR ANNULAR=27 SEC,UPPER RAMS=18 SEC, BLIND/SHEAR=28 SEC,LOWER RAMS=17 SEC,HCR CHOKE=2SEC,HCR KILL=2 SEC 02 30 - 03:30 1.00 BOPSUR P DECOMP RIG DOWN TEST EQUIPMENT. t 03:30 - 08:00 4.50 P WEXIT PICKUP WHIPSTOCK/WINDOW MILL BHA. 08:00 - 09:30 1.50 STWHIP P WEXIT RUN 1 STAND OF 4"DP AT 1041'MD, PERFORM SHALLOW TEST ON MWD, CIRCULATE 82 SPM @ 380 PSI AND 350 GPM. 09:30 - 12:00 2.50 STWHIP P WEXIT CONTINUE TRIPPNG IN HOLE WITH 4"DP TO 2374.56 MD.15 STANDS OF DP IN THE HOLE. 12:00 - 14:30 2.50 STWHIP P WEXIT TRIP TO 3980'MD AT 60FT/MIN EASY IN AND OUT OF SLIPS.MONITORING THE WELL VIA THE TRIP TANK.UP/WT=130K,DN/WT= 120K.FILLING PIPE EVERY 20 STANDS. START TAKING 2K WEIGHT ON STAND 33. STAND BACK STAND#33 AND INSTALL FOSV. Printed 4/9/2013 10:25.17AM North America-ALASKA-BP Page 18 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay ' Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:00 1.50 STWHIP P WEXIT SHUT DOWN FOR MEETING WITH RIG CREW AND BP REPRESENTATIVES. 16:00 - 17:30 1.50 STWHIP P WEXIT CONTINUE TRIPPING IN HOLE TO 4715'MD. SET DOWN WITH 4K MOVING STRING DOWN TO 4719'MD.SET DOWN 5K IN AN ATTEMPT TO WORK PAST BLOCKAGE SEVERAL TIMES WITH NO SUCCESS. 17:30 - 20:30 3.00 STWHIP N DPRB 4,719.00 WEXIT PULL OUT OF HOLE WITH WHIPSTOCK FROM 4719'MD TO 2049'MD MONITORING WELL VIA THE TRIP TANK.INITIAL UP WEIGHT=136K, INITIAL DOWN WEIGHT=125K. 20:30 - 23:00 2.50 STWHIP N DPRB 4,719.00 WEXIT AT 2049'MD PULLED INTO A TIGHT SPOT. TRIED TO WORK PAST THE SPOT BY PULLING UP TO 8K OVER WITH NO SUCCESS. WITH THE BIT DEPTH AT 2049'MD THE UPPER MILLS WOULD BE AT 2007'MD WHICH PLACES THEM ABOUT AT THE CASING PATCH.MAKE UP TOP DRIVE AND STAGE PUMPS TO 8 BPM 490 PSI,12 BPM 1000PSI, PICK UP WITH 10K OVERPULL.SLACK OFF TO NEUTRAL WEIGHT,STAGE PUMPS UP TO 15 BPM 1300PSI AND PULL THROUGH TIGHT SPOT WITH NO OVERPULL.CONTINUE TRIPPING OUT OF HOLE TO 960'MD. 23:00 - 00:00 1.00 STWHIP N DPRB 4,719.00 WEXIT SHUT DOWN HOLE FILL AND MONITOR WELL PRIOR TO PULLING BHA INTO STACK.WELL STATIC.REMOVE PS-21 SLIPS AND INSTALL MASTER BUSHINGS.START STANDING BACK 5"HWDP. / 2/28/2013 00:00 - 02:30 2.50 STWHIP N DPRB 4,719.00 WEXIT BREAK DOWN WHIPSTOCK BHA PER BAKER A,/ REP. 02:30 - 05:00 2.50 STWHIP • N DPRB 4,719.00 WEXIT PICK UP AND MAKE UP BHA#9-CLEAN OUT ASSEMBLY. 05:00 - 09:30 4.50 STWHIP N DPRB 4,719.00 WEXIT TRIP IN HOLE WITH 4"TO 4585'MD.UP • WEIGHT=131K,DOWN WEIGHT=125K. 09:30 - 11:00 1.50 STWHIP N DPRB 4,719.00 WEXIT CIRCULATE HI-VISC SWEEEP SURFACE TO SURFACE 420 GPM @ 2005 PSI,ROTATING WEIGHT=127K,RPM=20,TORQ=2.8K, CIRCULATE UNTIL CLEAN.TOTAL STROKES= 37K 11:00 - 12:00 1.00 STWHIP N DPRB 4,719.00 WEXIT DROP BALL(1")LATCH STD#40,PUMP DOWN BALL 290 GPM @ 3350,JET DOWN WITH REVERSE CIRCULATING JUNK BASKET TO 4966'MD,(43 STDS DP IN HOLE)40 RPM, TORQ=3K,ROTATING WEIGHT=131K,UP WEIGHT=133K,AND DOWN WEIGHT=128K. 12:00 - 16:00 4.00 STWHIP N DPRB 4,719.00 WEXIT CONTINUE WASHING DOWN TO BOTTOM FROM 4963'MD TO 5820'MD @ 15-30 FT/MIN, • j 290 GPM,3300-4000 PSI.REAM STD 52 AND PICK UP SINGLE.UP WEIGHT=148K,DOWN WEIGHT=128K.WASH DOWN AND TAG BOTTOM AT 5832'MD.SET DOWN 12K,PICK UP 10'TAG AGAIN AT SAME DEPTH. 16:00 - 16:30 0.50 STWHIP P WEXIT EMPTY ACTIVE PIT#2 IN PREP FOR FLUID SWAP ON CLOSED SYSTEM.PJSM WITH CREW AND TRUCK DRIVERS Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 19 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:00 1.50 STWHIP P WEXIT DISPLACE WELL WITH 9.8 PPG LSND.PUMP 30 BBL SPACER FOLLOWED BY 428BBL OF 9.8 LSND.RECIPROCATE AND ROTATE AT 50 RPM,PUMPING AT 315 GPM 3850 PSI.SHUT DOWN PUMP AND MONITOR WELL FOR 10 MIN=STATIC.SPR @ 5720'MD 84 GPM#1= 450 PSI,#2=455 PSI,@ 126 GPM#1=820 PSI,#2=825 PSI,@ 168 GPM#1=1300 PSI, #2=1320 PSI. 18:00 - 18:30 0.50 STWHIP N DPRB 4,719.00 WEXIT LAY DOWN TOP SINGLE.PULL OUT OF HOLE FROM 5830'MD TO 5629'MD MONITORING WELL VIA THE TRIP TANK.UP WEIGHT=147K, DOWN WEIGHT=128K. 18:30 - 23:00 4.50 STWHIP P WEXIT WELL CONTROL DRILL.D1 KICK WHILE TRIPPING(3MIN 20 SECONDS).ADDED COMPLEX DRILL COMPONENT UNCONTROLLED LEAK BELOW LOWER MOST BOP RAMS).DISCUSSED SCENARIO WITH DRILLER AND CREW FOLLOWED BY REVIEWING PARKER WSP AND CONDUCTING A DEMONSTRATION OF PROPER CHOKE MANIFOLD ALIGNMENT FOR UTILIZING THE PANIC LINE WITH RIG CREW. D-6 STRIPPING •DRILL.STRIP FOSV AND DART VALVE INTO THE HOLE,FOLLOWED BY TWO STANDS.3 CREW MEMBERS WERE ABLE TO GET EXPERIENCE RUNNING THE CHOKE.D5 WELL KILL DRILL,FOLLOWED BYAAR FOR ALL THREE DRILLS AND THE COMPLEX DRILL COMPONENT. 23:00 - 00:00 1.00 STWHIP P WEXIT BREAK OUT AND LAY DOWN DART VALVE AND FOSV.PUMP DRY JOB.BLOW DOWN TOP DRIVE AND MUD LINE. 3/1/2013 00:00 - 04:00 4.00 STWHIP N DPRB 4,719.00 WEXIT POOH WITH 4"DRILL PIPE FROM 5625"MD TO 880'MD.MUD WEIGHT IN=9.8PPG,WEIGHT OUT=9.8PPG 04:00 - 06:00 2.00 STWHIP N DPRB 4,719.00 WEXIT FLOW CHECK WELL 10 MINUTES,CHANGE ELEVATOR INSERTS,REMOVE PS-21 SLIPS, REPLACE WITH MASTER BUSHING AND MANUAL SLIPS.PULL OUT OF HOLE WITH BHA,LAYING DOWN BOOT BASKETS AND REVERSE CIRCULATING JUNK BASKET. CLEAN OUT BASKETS.(CHUNKS OF ES CEMENTER FOUND AS WELL ASA PIECE OF CASING) 06:00 - 06:30 0.50 STWHIP N DPRB WEXIT SERVICE TOP DRIVE AND INSPECT DERRICK. 06:30 - 10:00 3.50 STWHIP N DPRB 4,719.00 WEXIT MAKE UP WHIPSTOCK BHA PER BAKER REP, SCRIBE MWD TO HIGH SIDE OF WHIPSTOCK, AND CONTINUE TO TRIP IN HOLE WITH WHIPSTOCK/MILLS. 10:00 - 11:00 1.00 STWHIP N DPRB 4,719.00 WEXIT INSTALL PS-21 SLIPS,CHANGE OUT ELEVATOR INSERTS,PERFORM SHALLOW TEST ON MWD,CIRCULATING AT 350 GPM. 11:00 - 12:00 1.00 STWHIP N DPRB 4,719.00 WEXIT CONTINUE TRIPPING IN HOLE ON 4"DRILL PIPE DOWN TO 1901'MD.UP WEIGHT=105K, DOWN WEIGHT=105K.FILL PIPE EVERY 20 STANDS. 12:00 - 16:00 4.00 STWHIP N DPRB 4,719.00 WEXIT CONTINUE TRIPPING IN HOLE WITH WHIPSTOCK TO 4724'MD.MONITORING WELL VIA TRIP TANK AND FILLING PIPE EVERY 20 STANDS. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 20 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 j End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL(§)78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 STWHIP N DPRB 4,719.00 WEXIT AT 4724'MD SET DOWN 6K ON OBSTRUCTION.ATTEMPT TO WORK THROUGH SEVERAL TIMES.PICK UP TO 4656' MD,MAKE UP TO TOP DRIVE AND ATTEMPT TO WASH THROUGH,PUMPING AT 8.5 BPM, 830 PSI,UP WEIGHT=131K,DOWN WEIGHT= 125K.ATTEMPT TO WORK BY OBSTRUCTION , BY SETTING DOWN 5-10K ON OBSTRUCTION. PICK UP STRING,ROTATE 1/4 TURN AND I REPEAT FOR 5 REPETITIONS.WORKED BHA DOWN TO 4732'MD.COULD NOT WORK ANY FURTHER.MUD WEIGHT IN =9.8PPG,MUD WEIGHT OUT 9.8PPG. -- 18:00 - 19:00 1.00 STWHIP N DPRB 4,719.00 WEXIT PICK UP STRING,STAND BACK 1 STAND. ' FLOW CHECK WELL FOR 10MINS.WELL !STATIC.BLOW DOWN TOP DRIVE.PULL OUT OF HOLE 5 STANDS FROM 4654'MD TO 4274' MD MONITORING THE WELL AND iDISPLACEMENT V ITH THE TRIP TANK GOOD DISPLACEMENT.UP WEIGHT=132K,DOWN WEIGHT=125K 19:00 - 22:30 3.50 STWHIP N DPRB 4,719.00 WEXIT PUMP DRY JOB,BLOW DOWN TOP DRIVE, CONTINUE TO PULL OUT OF HOLE FROM 4274'MD TO 1048'MD. 22:30 - 23:00 0.50 STWHIP N , DPRB I 4,719.00 WEXIT MONITOR WELL FOR 10MIN PRIOR TO PULLING BHA THROUGH BOP.WELL STATIC. ' CHANGE OUT PS-21 SLIPS FOR MASTER __ BUSHING.PJSM WITH BAKER REPS. _ 23:00 - 00:00 1.00 STWHIP N DPRB 4,719.00 WEXIT CONTINUE TO PULL OUT OF HOLE WITH BHA. v 3/2/2013 00:00 - 02:00 2.00 WHIP N DPRB 4,719.00 WEXIT BREAK DOWN WHIPSTOCK/MILLS BHA,MAKE UP BHA WITH WHIPSTOCK AND REMOVE THREE WATERMELON MILLS.CHANGE WHIPSTOCK ANCHOR SHEAR SCREWS AND WHIPSTOCK SHEAR BOLT. 02:00 - 03:30 1.50 WHIP N DPRB 4,719.00 WEXIT RIH WITH WHIPSTOCK BHA. 03:30 04:00 0.50 WHIP N DPRB 4,719.00 WEXIT PERFORM SHALLOW TEST ON MWD AT 1042' MD,CIRCULATE AT 350 GPM WITH 360 PSI 04:00 - 09:00 5.00 WHIP N DPRB 1 4,719.00 WEXIT TRIP IN HOLE ON 4"DRILL PIPE FILLING PIPE EVERY 20 STANDS DOWN TO 4847'MD.SET I 7K ON TIGHT SPOT AND WORKED WHIPSTOCK THROUGH.ONCE THROUGH,UP WEIGHT=140K,DOWN WEIGHT=125K. 09:00 - 11:00 2.00 WHIP N DPRB 4,719.00 WEXIT CONTINUE TRIPPING IN HOLE DOWN TO 5774'MD.UP WEIGHT=141K,DOWN WEIGHT =131K 11:00 - 12:00 1.00 WHIP N DPRB 4,719.00 WEXIT PUMP 500 GPM WITH 1510 PSI.ORIENT TOOL FACE. 12:00 - 12:30 0.50 WHIP ' N DPRB 4,719.00 WEXIT ORIENT WHIPSTOCK TO 15 DEG RIGHT OF V, HIGH SIDE.SET AT 5834'MD.SET DOWN 16K I ON ANCHOR AND SEE INDICATION OF SHEAR.PICK UP 10K TO VERIFY ANCHOR I SET,SET BACK DOWN 45K TO SHEAR SLIDE BOLT,GOOD INDICATION.PICK UP OFF I SLIDE. 12:30 - 13:30 1.00 WHIP N DPRB 4,719.00 WEXIT OBTAIN SLOW PUMP RATES,SHUT DOWN PUMPS AND MONITOR FOR FLOW-STATIC. MUD WEIGHT IN AND OUT 9.8 PPG.PULL 5 STANDS WET FROM 5820'MD TO 4545'MD. 11 MONITORING WELL VIA TRIP TANK PROPER DISPLACEMENT. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 21 of 43 Operation Summary Report Common Well Name.02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 13:30 - 14:00 0.50 WHIP N DPRB 4,719.00 WEXIT PJSM.SERVICE TOP DRIVE,BLOCKS,AND RIG FLOOR EQUIPMENT.CHANGE OUT FILTERS ON DRAWWORKS.MONITOR WELL VIA TRIP TANK 14:00 - 14:30 0.50 WHIP N DPRB 4,719.00 WEXIT DERRICK INSPECTION.PUMP DRY JOB, BLOW DOWN TOP DRIVE AND MUD LINE. 14:30 - 15:30 1.00 WHIP N RREP WEXIT REPAIR LEAKING SEALS ON IRON DERRICK MAN. 15:30 - 18:00 2.50 WHIP N DPRB 4,719.00 WEXIT PULL OUT OF HOLE FROM 5445'MD TO 1048' MD MONITORING WELL VIA THE TRIP TANK. PROPER DISPLACEMENT.UP WEIGHT= _ 140K,DOWN WEIGHT=126K _ 18:00 - 18:30 0.50 WHIP N DPRB 4,719.00 WEXIT MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA INTO STACK WELL STATIC. CHANGE OUT PS-21 SLIPS AND INSTALL MASTER BUSHINGS.PRE JOB SAFETY MEETING WITH BAKER REP. 18:30 - 20:00 1.50 WHIP N DPRB 4,719.00 WEXIT STAND BACK 6 STANDS OF 5"HWDP AND 3 STANDS OF 6-3/4"DRILL COLLARS.BREAK OUT AND LAY DOWN BHA PER BAKER REP. 20:00 - 23:00 3.00 WHIP N DPRB , 4,719.00 WEXIT CLEAN AND CLEAR RIG FLOOR.PJSM WITH CREWAND BAKER REP.MAKE UP 9-5/8" WINDOW MILLING BHA PER BAKER REP.RUN IN HOLE WITH MILLING BHA.CHANGE OUT MASTER BUSHING,INSTALL PS-21 SLIPS. 23:00 - 00:00 1.00 STWHIP N DPRB 4,719.00 WEXIT RUN IN HOLE WITH 9-5/8"WINDOW MILLING BHA FROM 1005'MD TO 1851'MD FILLING PIPE AT STAND#10.UP WEIGHT=92K,DOWN WEIGHT=99K. 3/3/2013 00:00 - 03:00 3.00 STWHIP N DPRB 4,719.00 WEXIT RUN IN HOLE WITH MILLING ASSEMBLY ON 4" DRILL PIPE TO 4,855'MD.FILL EVERY 20 STANDS.UP WEIGHT 129K,DOWN WEIGHT 120K.AT 4,848'MD TAKING 10K DRAG TO MOVE DOWN HOLE. 03:00 - 03:30 0.50 STWHIP N DPRB 4,719.00 WEXIT ATTEMPT TO WORK THROUGH TIGHT SPOT AT 4,848'MD,SET DOWN 12K-NO GO.PULL UP WITH 5K OVER PULL.GO BACK DOWN AND TAKE 15K DOWN,PULL UP WITH 11K OVER.GO BACK DOWN WITH 20K DOWN. 03:30 - 04:00 0.50 STWHIP N DPRB 4,719.00 WEXIT ATTEMPT TO BRING PUMPS ONLINE.POP OFFS TRIPPING AT 400 PSI.RESET POP OFFS 3 TIMES BEFORE BEING ABLE TO BRING PUMPS UP TO RATE. 04:00 - 04:30 , 0.50 STWHIP N DPRB 4,719.00 WEXIT BRING PUMPS UP TO 500 GPM WITH 1225 PSI.KICK IN ROTARY TO 40 RPM WITH 3K FREE TORQUE.UP WEIGHT 121K,DOWN 129K,ROTARY WEIGHT 127K WORK DOWN TO 4,855'MD,TAKE 7-10K TORQUE WITH 2-3 WOB.MILL DOWN TO 4,863'MD WITH 0-3 WOB AND 4-7K TORQUE.BREAK THROUGH AT 4,879'MD AND TAKE STAND DOWN TO 4,896'MD. BACKREAM WITH 122K UP WEIGHT ANT 3K TORQUE.AT 4,868'MD 4K OVER PULL WITH 4-7K TORQUE.AT 4,854'MD TORQUE AT 2-5K AND 122K UP WEIGHT.CLEAR UP AT 4,840' MD.SHUT DOWN ROTARY. Printed 4/9/2013 10.25.17AM North America-ALASKA-BP Page 22 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 05:30 1.00 STWHIP N DPRB 4,719.00 WEXIT ATTEMPT TO WASH THROUGH TIGHT SPOTS. PUMP AT 500 GPM WITH 1220 PSI.UP WEIGHT 127K,DOWN WEIGHT 124K.TAKE 5K DOWN AT 4,845'MD BUT POP THROUGH. TAKE 8K DOWN AT 4,858'MD,PULL UP AND GO BACK DOWN TAKE 14K DOWN.PULL UP • AND ATTEMPT TO GO DOWN A THIRD TIME •AND TAKE 20K DOWN,PULL UP WITH 17K OVER. KICK IN ROTARY AT 80 RPM WITH 5K FREE TORQUE.ROTARY WEIGHT 123K,DOWN WEIGHT 128K,UP WEIGHT 122K.REAM DOWN TO 4,861'MD AND TAKE 3K DOWN WITH 10K TORQUE.PASS THROUGH AND CONTINUE TO BOTTOM OF STAND AT 4,896' MD. BACKREAM AT 121K AND 2-4K TORQUE.AT 4,861'MD UP WEIGHT 122K WITH 5-9K. BREAK FREE AT 4,840'MD.KICK OUT ROTARY.UP WEIGHT 126K,DOWN WEIGHT 124K.WORK DOWN WITH 4-5K DRAG.AT •4,852'TAKE 14K DOWN WEIGHT BUT WORK •THROUGH.CONTINUE DOWN TO BOTTOM OF STAND AT 4,896'MD. KICK OFF PUMPS PULL UP WITH NO PROBLEMS TO 4,840'MD.GO BACK DOWN, TAKE 14K DOWN AT 4,858 BUT GO THROUGH AND TO BOTTOM OF STANDAT4,896'MD. 05:30 - 06:00 0.50 STWHIP P • WEXIT BLOW DOWN AND PREP TO RIH WITH MILLING ASSEMBLY. • *FINISH NPT FOR DOWNHOLE PROBLEMS 06:00 - 06:30 0.50 STWHIP P • WEXIT RUN IN HOLE WITH MILLING ASSEMBLY TO 5,106'MD. 06:30 - 07:00 0.50 STWHIP P WEXIT PERFORMED UN-ANNOUNCED D1 DRILL (KICK WHILE TRIPPING).REACTION TIME 2 MINUTES,20 SECONDS.HELD AAR-NO FINDINGS. fJ 4' 07:00 - 07:30 0.50 STWHIP P WEXIT RUN IN HOLE TO 5,778'MD.OBTAIN vV PARAMETERS.UP WEIGHT 140K,DOWN WEIGHT 130K,ROT WEIGHT 135K AT 80 RPM WITH 5K FREE TORQUE.PUMP AT 425 GPM WITH 1100 PSI. 07.30 - 12:00 4.50 STWHIP P WEXIT TAG UP TOP OF WHIPSTOCK SLIDE AT 5,810' MD.BEGIN MILLING OPERATIONS.PUMP AT 425 GPM WTIH 1075 PSI.ROTATE AT 80 RPM WITH 6K TORQUE.WOB 1K.MILL TO 5,818' MD. iNto P Printed 4/9/2013 10:25:17AM North America*ALASKA Page 23 of 43 Operation Summary'Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 STWHIP P WEXIT PUMP HI-VIS SWEEP AT 5,818'MD.MILL FROM 5,818'MD TO 5,827'MD.PUMP AT 525 GPM WITH 1075 PSI.ROTATE AT 80-100 RPM AND 6-8K WOB WITH 6-10K TORQUE.AT 5,821' TORQUE UP TO 18K AND STALL.PICK UP AND GO BACK DOWN WORKING WTIH 2K WOB, ROTATING AT 80 RPM WITH 6-8 TORQUE. TORQUE DROPPING OFF TO 5K(FREE TORQUE)AT 5,82T MD.DRILL 20'OF NEW FORMATION TO 5,839'MD.ROTATE AT 80-100 RPM WITH 6K TORQUE.PUMP AT 525 GPM WITH 1.075 PSI. 14:30 - 15:30 1.00 STWHIP P WEXIT REAM AND WORK WINDOW FROM 5,810'MD TO 5,839'MD.WORK THROUGH WINDOW SEVERAL TIMES ROTATING AT 100 RPM. PUMP AT 425 GPM WITH 1075 PSI.SHUT DOWN ROTARY AND SLIDE IN AND OUT OF WINDOW WITH NO PROBLEMS. TOW-5,810'MD MOW-5,818'MD \J BOW-5,827'MD 15:30 - 16:30 1.00 STWHIP P WEXIT PUMP 2 SWEEPS SURFACE TO SURFACE UNTIL CLEAN.PUMP AT 425-500 GPM WITH 1100-1400 PSI.ROTATE AND RECIPROCATE. MUD WEIGHT IN AND OUT 9.8 PPG.SHUT DOWN ROTARY AND PUMPS.WORK IN AND OUT OF WINDOW WITH NO PROBLEMS. FLOW CHECK WELL FOR 10 MINUTES- STATIC. 16:30 - 18:00 1.50 STWHIP P WEXIT HOLD PRE JOB SAFETY MEETING.RIG UP FOR LEAK OFF TEST AND PURGE LINES. PERFORM LEAK OFF TEST WITH 1000 PSI AT 5,810'MD,5,387'TVD AND 9.8 PPG LSND IN SYSTEM.PUMP 8.5 BBLS AND GET BACK 7.4 BBLS.PRESSURE DROPPED FROM 1200 PSI TO 800 PSI IN 10 MINUTES.LEAK OFF EMW CALCULATED TO 13.3 PPG.CONFIRMATION OF LOT FROM ODE. 18:00 - 19:00 1.00 STWHIP P WEXIT OBTAIN SLOW PUMP RATES.MONITOR WELL FOR 10 MINUTES-STATIC.PUMP DRY JOB. BLOW DOWN TOP DRIVE AND KILL LINE. CLOSE MANUAL KILL.MUD WEIGHT IN AND OUT 9.8 PPG. 19:00 - 21:30 2.50 STWHIP P WEXIT UP WEIGHT 142K.POOH FROM 5,781'MD TO 1,005'MD.MONITOR WELL AT BHA-STATIC. GOOD DISPLACEMENT.UP WEIGHT 125K. CHANGE OUT PS-21 SLIPS AND INSTALL MASTER BUSHINGS.HOLD PRE JOB SAFETY MEETING WITH BAKER PERSONNEL. DISCUSS NON SHEARABLE COMPONENTS OF BHA AND PROCEDURE FOR HANDLING DURING WELL CONTROL OPERATIONS. 21:30 - 00:00 2.50 STWHIP P WEXIT STAND BACK 6 STANDS HEAVY WEIGHT DRILL PIPE.LAY DOWN 9 JOINTS 6-3/4"DRILL COLLARS.BREAK OUT AND LAY DOWN MILLING BHA PER BAKER REPRESENTITIVE. SAFETY JOINT READY TO GO IN PIPE BARN. 3/4/2013 00:00 - 01:00 1.00 STWHIP P WEXIT CONTINUE TO LAY DOWN MILLING BHA PER BAKER REP.CLEAN AND CLEAR RIG FLOOR, FLUSH STACK. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 24 of 43 Operation Summary Report Common Well Name 02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Dame:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor.PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 01:00 - 01:30 0.50 STWHIP P WEXIT SERVICE RIG:GREASE TOP DRIVE,CHECK OIL 01:30 - 04:00 2.50 STWHIP P WEXIT MAKE UP INTERMEDIATE HOLE DRILLING ASSEMBLY.BHA#12 04:00 - 04:30 0.50 STWHIP P WEXIT LOAD RADIOACTIVE SOURCE PER SLB MWD 04:30 - 06:00 1.50 STWHIP P WEXIT CONTINUE MAKING UP INTERMEDIATE HOLE DRILLING ASSEMBLY TO 1038'MD. 06:00 - 07:00 1.00 STWHIP P WEXIT I CHANGE ELEVATOR INSERTS,INSTALL PS-21 SLIPS,PERFORM SHALLOW TEST ON MWD, PUMP L 350 GPM=700 PSI. 07:00 - 08:00 1.00 STWHIP P WEXIT TRIP IN HOLE WITH 4"DRILL PIPE STAND FROM DERRICK TO 1481'MD,PICK UP GHOST REAMER. 08:00 - 12:00 4.00 STWHIP P WEXIT CONTINUE TRIPPING IN HOLE WITH 4"DRILL PIPE STANDS TO 5314'MD FILLING PIPE EVERY 20 STANDS. 12:00 - 14:00 2.00 STWHIP , P WEXIT RUN IN HOLE TO 5620'MD MONITORING WELL VIA TRIP TANK UP WEIGHT=136K,DOWN WEIGHT=123K.MAD PASS DOWN AT 10OFT/HR FROM 5620'MD TO 5830'MD. 14.00 - 15:30 1.50 STWHIP P WEXIT ESTABLISH CIRCULATION AT 5000PM AND 2250PSI.ORIENT MOTOR TO SLIDE THROUGH WINDOW.OBTAIN SPRS @ 5800'MD, 5365'TVD,@ 15:00HRS.PUMP#1 20 SPM= 345PSI,30SPM=430PSI,40 SPM=525PSI. PUMP#2 20 SPM=340PSI,30 SPM=425,40 1 SPM=525PSI.MW=9.8PPG,VIS=49.SLIDE j DRILLING ASSEMBLY THROUGH WINDOW LWITH PUMPS OFF.NO ISSUES. 15:30 - 19:00 3.50 DRILL P INTI 1 DRILLAHEAD PER SLB DIRECTIONAL DRILLER FROM 5839'MD TO 6005'MD.130 SPM/550 GPM WITH 2350PSI.UP WEIGHT= 141K,DOWN WEIGHT=126K,ROTATING WEIGHT=130K @ 40RPM WITH 5-7K TO. 19:00 - 19:30 0.50 DRILL N RREP 6,004.97 INTI PULL OUT OF HOLE TO WINDOW FROM 6005' MD TO 5788'MD.UP WEIGHT=142K,DOWN WEIGHT=125K 19 30 - 21:30 2.00 DRILL N RREP 6,005.00 INTI REPAIR RIG,TDS PIPE HANDLER MONKEY BOARD COLLISION WARNING SYSTEM AND IRON DERRICK MAN 21 30 - 22 00 0.50 DRILL N RREP 6,004.97 INTI ESTABLISH CIRCULATION AT 500 GPM AND 2250 PSI.ORIENT MOTOR TO SLIDE THROUGH WINDOW AT 5788'MD.SLIDE DRILLING ASSEMBLY THROUGH WINDOW WITH PUMPS OFF.NO ISSUES.TRIP IN HOLE TO BOTTOM. 22:00 - 00:00 2.00 DRILL P INTI DRILLING AHEAD PER SLB DIRECTIONAL DRILLER FROM 5839'MD 6005'MD.550 GPM WITH 2350 PSI.UP WEIGHT=141K,DOWN WEIGHT=126K,ROTATING WEIGHT=130K. 40 RPM WITH 5-7K TO. 3/5/2013 00:00 - 03:00 3.00 DRILL P INTI DRILL FROM 6005'MD TO 6258'MD.600 GPM. MUD WEIGHT=9.8PPG IN,9.8 PPG OUT. 03:00 - 04:30 1.50 DRILL P INTI AT 6250'MD PUMP SWEEP AT 600 GPM AND 2740 PSI,SURFACE TO SURFACE UNTIL SWEEP IS CAUGHT AND RETURNS CLEAN UP. Printed 4/9/2013 10:25 17AM North America-ALASKA-BP Page 25 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 I End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase ; Description of Operations (hr) (usft) 04:30 - 05:30 1.00 DRILL P INTI TRIP OUT OF HOLE AND STAND BACK 11 STANDS OF 4"DRILL PIPE TO 5219'MD UP WEIGHT=144K,DOWN WEIGHT=125K 05:30 - 06:30 I 1.00 DRILL P INTI PICKUP STORM PACKER AS PER HALIBURTON REP 06:30 - 07:30 1.00 DRILL P INTI RUN IN HOLE WITH 4 STANDS OF 4"DRILL PIPE TO 5598'MD(BIT DEPTH),CENTER OF STORM PACKER ELEMENT©=377.68'MD. 07:30 - 08:00 0.50 DRILL P INTI 'SET STORM PACKER AT 377.68'MD CENTER OF ELEMENT,TAGE @ 371.34'MD.UP 'WEIGHT=140K,DOWN WEIGHT=122K 08:00 - 08:30 0.50 DRILL P INTI I TRIP OUT OF HOLE AND STAND BACK 4 STANDS OF 4"DRILL PIPE.BREAK OUT AND LAY DOWN RUNNING TOOL. 08:30 - 09:00 0.50 BOPSUR P INTI FLUSH STACK. 09:00 - 09:30 0.50 DRILL P INTI PRESSURE TEST STORM PACKER TO 1000 PSI FOR 5 MIN ON CHART 109:30 - 11:00 1.50 BOPSUR P INTI MAKE UP TEST JOINT,DRAIN STACK,PULL WEAR RING,SET TEST PLUG,FLUID PACK STACK. 11:00 - 16:00 5.00 BOPSUR P INTI TEST BOPE PER AOGCC AND BP ADWOP STANDARDS TO 250PSI LOW,3500PSI HIGH.5 MIN TESTS.TEST WITNESSED BYAOGCC REP CHUCK SCHEVE..FAIL/PASS TEST ON HCR KILL PRESSURE TEST. SEE ATTACHED CHARTS '16:00 - 17:00 1.00 BOPSUR P INTI RIG DOWN AND BLOW DOWN TEST EQUIPMENT AND LINES.DRAIN MUD GAS SEPERATOR.REMOVE TEST PLUG,INSTALL 9"ID WEAR RING. 17:00 - 20.00 3.00 DRILL P INTI !PJSM FOR MAKING UP RTTS RUNNING TOOL I FOR PULLIN RTTS,PER HALLIBURTON REP. I RUN IN HOLE 4 STANDS,FOSV,AND 5'PUP TO RETRIEVE 9-5/8"RTTS PER HALLIBURTON REP. MAKE UP TO RTTS AND DISENGAGE TOOL.PICK UP AND PULL OUT OF HOLE,LAY DOWN RTTS AND RUNNING TOOL 20:00 - 21:00 1.00 DRILL P INTI RUN IN HOLE TO 5800'MD MONITORING THE WELL VIA TRIP TANK.UP WEIGHT=142K, DOWN WEIGHT=126K. 21:00 - 22:30 1.50 DRILL P INTI ESTABLISH CIRCULATION 350 BPM 1250 PSI AND ORIENT MOTOR PRIOR TO EXITING WINDOW.TRIP IN HOLE TO 6168'MD.MAKE UP TOP DRIVE AND WASH DOWN TO BOTTOM AT 6257'MD. 22:30 - 00:00 1.50 DRILL P I INTI DRILLING FROM 6257'MD TO 6351'MD.600 I GPM AND 2750 PSI.UP WEIGHT=146K, DOWN WEIGHT 128K,ROTATING WEIGHT= 140K WITH 40 RPM AND 6-7K TORQ. 3/6/2013 00:00 - 08:30 8.50 DRILL P INTI DRILL AHEAD IN 8.5"INTERMEDIATE HOLE SECTION FROM 6351'MD TO 6825'MD. 2700-3000 PSI(g 600GPM.UP WEIGHT=162K, DOWN WEIGHT=136K,ROTATING WEIGHT= 146K.RPM=40,FREE TORQ=5-6K. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 26 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 09:30 1.00 DRILL N DPRB 6,825.00 INTI RETURN FLOW GAIN FROM 25%TO 50%. CLOSED ANNULAR PREVENTER,MONITORED PRESSURE,ZERO PRESSURE ON DRILL PIPE AND CASING,OPENED TO MUD GAS SEPERATOR PER WELL SITE LEADER. MONITORED FLOW FOR 10 MINS=NO FLOW OBSERVED. 09:30 - 11:00 1.50 DRILL P INTI CONTINUE DRILLING FROM 6825'MD TO 7050' MD.BEGING WEIGHT UP PROCESS FOR MUD SYSTEM BY PUMPING 10.2PPG MUD INTO ACTIVE SYSTEM. 11:00 - 12:00 1.00 DRILL P INTI 'DRILL TO 7111'MD AT 600 GPM AND 3100 PSI. UP WEIGHT=170K,DOWN WEIGHT=148K, ROTATING WEIGHT=154K.RPM=80,FREE TORQ=6K 12:00 - 16:00 4.00 DRILL P INTI DRILLING AHEAD PER SCHLUMBERGER DIRECTIONAL DRILLER.FROM 7111'MD TO 7496'MD.3750 PSI AT 600 GPM.UP WEIGHT= 178K,DOWN WEIGHT=150K,ROTATING WEIGHT=155K WITH 80 RPM AND 8-10K TORQ. 16:00 - 17:00 1.00 DRILL N RREP 7,496.00 INTI CHANGE OUT AIR BOOTS ON BOP RISER DUE TO LEAK. 17:00 - 00:00 7.00 DRILL P INTI •CONTINUE TO DRILL AHEAD PER SCHLUMBERGER DIRECTIONAL DRILLER FROM 7496'MD TO 8097'MD.600 GPM,3900 PSI,UP WEIGHT=183K,DOWN WEIGHT= 156K,ROTATING WEIGHT=155K WITH 80-100 RPM AND 8-10K TORQ. 3/7/2013 00:00 - 08:30 8.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE SECTION FROM 8097'MD AT MIDNIGHT TO TOP OF HRZ AT 8496'MD(399'IN 8.5 HRS= 47 FPH WITH CONNECTIONS);600 GPM,40-80 TD RPM,205-245 BIT RPM,6-7 KFT-LBS OFF BOTTOM TORQUE,8-10 KFT-LBS ON BOTTOM,3500-3600 PSI OFF BOTTOM PRESSURE,3700-3900 PSI ON BOTTOM,10-20 KLBS WOB. MW IN/OUT=10.2 PPG,46 SEC/QT. NO LOSSES TO FORMATION WHILE DRILLING AHEAD. -SLIDE 30'-50'EACH STAND AT 30L-50L TO BUILD INC FROM 0°TO 15°PRIOR TO HRZ. -OBTAIN SLOW PUMP RATES AT 8150'MD. ✓ SERVICE TOP DRIVE AT 8150'MD CONNECTION. FORMATION TOP: CM1: 8156'MD,7616'TVD(42'HIGH) Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 27 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date 3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 17:00 8.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 8097'MD AT MIDNIGHT TO 8956' •MD(859'IN 17 HRS=51 FPH WITH CONNECTIONS);550 GPM,100 TD RPM,265 I BIT RPM,6-7 KFT-LBS OFF BOTTOM TORQUE, • 8.5-10 KFT-LBS ON BOTTOM,3250-3300 PSI OFF BOTTOM PRESSURE,3450-3550 PSI ON BOTTOM,10-20 KLBS WOB. MW IN/OUT= 10.3 PPG,43 SEC/QT. NO LOSSES TO FORMATION WHILE DRILLING AHEAD. -BACKREAM 30'ON EACH CONNECTION AND WASH DOWN AT 75%PUMP RATE -MAINTAIN CONSTANT DRILLING PARAMATERS FOR FINAL 100'IN ATTEMPT TO SEE DRILLING BREAK(NOT OBSERVED) -TOTAL ON BOTTOM DRLG HRS FOR DAY= 11.16 HRS,SLIDING=5.01 HRS,ROTATING= 6.15 -OBTAIN SLOW PUMP RATES AT 8635'MD FORMATION TOPS: HRZ: 8496'MD,7950'MD(11'LOW) PUT RIVER: 8795'MD,8240'TVD(2'LOW) •KINGAK: 8810'MD,8255'TVD(9'HIGH) 17:00 - 21:00 4.00 DRILL P INTI 7 CASING,SAG RIVER CASING POINT PICK AS FOLLOWS: -CIRCULATE BOTTOMS UP(#1)AT 8956'MD WHILE RECIPROCATING TOP 45'OF STAND; 550 GPM,3280 PSI. MINOR AMOUNTS OF GLAUCONITE IN SAMPLE BUT VERY LITTLE SAND. -DRILL 5'MD ADDITIONAL FOOTAGE TO 8961' MD. CIRCULATE BOTTOMS UP(#2)WHILE RECIPROCATING TOP 45'OF STAND;550 GPM,3260 PSI. CONFIRM SAND/GLAUCONITE IN SAMPLES. TOWN GEOLOGIST DETERMINES 8961'MD IN 3'INTO SAG RIVER. -DRILL 5'MD ADDITIONAL FOOTAGE TO 8966' MD TO PLACE PLANNED CASING SET DEPTH 8'INTO SAG RIVER FORMATION. TOP OF ✓ SAG RIVER PROJECTED AT 8958'MD,8398' TVD(1'HIGH,94'VERTICAL BELOW TJA MARKER AS EXPECTED). -CIRCULATE FINAL BOTTOMS UP(#3)WHILE RECIPROCATING TOP 45'OF STAND;550 GPM,3260 PSI. SHAKERS CLEANED UP DURING CIRCULATIONS. TAKE SLOW PUMP RATES. FLOWCHECK WELL PRIOR TO PULLING OFF BOTTOM(STABLE). FINAL PU WEIGHT=208 KLBS,SLACKOFF=161 KLBS, ROTATING=172 KLBS,8.5-9 KFT-LBS TORQUE AT 100 FINAL 8-1/2"INTERMEDIATE HOLE SECTION t �ir TOTAL DEPTH=8966'MD,8405'TVD 8 INC/AZI AT CASING POINT=14.97°/265°• Ott Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 28 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-01 OHM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 00:00 3.00 DRILL P INTI PLANNED WIPER TRIP: PUMP OUT OF HOLE AT 1/2 BPM,230 PSI FROM HOLE SECTION TD AT 8966'MD TO 8440'MD(TOP OF HRZ AT 8496'MD,7950'TVD);25 FPM. PICKUP WEIGHT OFF BOTTOM=211 KLBS. PULL OUT OF THE HOLE ON ELEVATORS FROM 8440' MD TO 7700'MD AT MIDNIGHT. NO HOLE ISSUES ENCOUNTERED. MAX OVERPULLS= 15-20 KLBS. HOLE TAKING CORRECT AMOUNT OF FLUID. 3/8/2013 00:00 - 00:30 0.50 DRILL P INTI I COMPLETE WIPER TRIP FROM 7700'MD AT MIDNIGHT TO 7211'MD(-250'ABOVE GHOST REAMER AT TD). FLOW CHECK WELL (STABLE) 00:30 - 01:00 0.50 DRILL P INTI SERVICE TOP DRIVE AND DRAWWORKS 01:00 - 03:00 2.00 DRILL P INTI RUN BACK IN THE HOLE FROM 7200'MD TO 8-1/2"HOLE SECTION TOTAL DEPTH AT 8966' MD ON ELEVATORS. WASH FINAL STAND TO BOTTOM. RE-TAG WELL TOTAL DEPTH AT 8968'MD(NO CORRECTIONS MADE,TD TO REMAIN 8966'MD). NO HOLE ISSUES RETURNING TO BOTTOM. 03:00 - 07:00 4.00 DRILL P INTI CIRCULATE HOLE CLEAN AND CONDITION MUD FOR RUNNING CASING. CIRCULATE AROUND 25 BBL HI-VIS SWEEP(-25% INCREASE IN CUTTINGS OVER SHAKERS). CUT YIELD POINT BACK FROM 21 LB/10OFT^2 TO 19 LB/100FT^2 IN/OUT. MW IN/OUT=10.3 PPG. RETURNS VERY CLEAN OVER SHAKERS AFTER FOUR TOTAL ROUND TRIP CIRCULATIONS AT 600 GPM,3820 PSI,130 RPM,8-8.5 KFT-LBS TORQUE, I RECIPROCATING TOP 45'OF STAND. MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STABLE). 07:00 - 16:00 9.00 DRILL P INTI PULL OUT OF HOLE FOR RUNNING CASING: PUMP OUT OF HOLE AT 1 BPM,250 PSI FROM HOLE SECTION TD AT 8966'MD TO 8440'MD (TOP OF HRZ AT 8496'MD,7950'TVD);35 FPM. PICKUP WEIGHT OFF BOTTOM=212 KLBS, SLACKOFF=163 KLBS,ROTATING=175 KLBS. MINOR 10-15 KLBS OVERPULLS. NO HOLE ISSUES ENCOUNTERED PULL OUT OF THE HOLE ON ELEVATORS FROM 8440'MD TO 9-5/8"WINDOW AT 5810' MD. NO HOLE ISSUES ENCOUNTERED. HOLE TAKING CORRECT AMOUNT OF FLUID. MONITOR WELL FOR 10 MIN AT WINDOW (STABLE). HOLE IS VERY CLEAN ABOVE CM1 FORMATION AT 8179'MD. PULL OUT OF HOLE FROM WINDOW AT 5810' MD TO BHA AT 1038'MD,RACKING BACK4" DRILLPIPE. FLOWCHECK WELL PRIOR TO PULLING BHA INTO STACK(STABLE). Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 29 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No..PARKER 273 Spud Date/Time:6/18/1980 12:00:OOAM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. U WI: Active datum:02-15B ACTUAL(78.35usft(above Mean Sea Level) Date From-To Hrs ' Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) I 16:00 - 18:30 2.50 DRILL P INTI RACK BACK 3 STANDS 4"HWDP AND 4 STAND 5"HWDP IN DERRICK FROM 1038'MD TO 205' MD(STANDS WILL BE LAID DOWN OFFLINE). HOLD PRE-JOB SAFETY MEETING FOR •LAYING DOWN BHA AND REMOVING NUCLEAR SOURCE. . 18:30 - 21:00 2.50 DRILL P INTI LAYDOWN 8-1/2"DRILLING ASSEMBLY FROM '205'MD TO SURFACE. SLB MWD REPS REMOVE NUCLEAR SOURCE FROM ADNVISION675 LWD TOOL. GRADE HYCALOG DTX619M-D6 PDC BIT AS 3-2-IN GAUGE GUAGE,SEE ATTACHED PHOTOS. HOLD AAR FOR LAYING DOWN BHA. 21.00 - 22.00 1.00 DRILL P INTI CLEAN AND CLEAR RIG FLOOR AFTER !TRIPPING. LOWER BHA TOOLS DOWN TO GROUND WITH TOOL CRANE. DRAIN BOP STACK. 22.00 - 23.30 1.50 BOPSUR P INTI CHANGEOUT UPPER RAMS FROM 2-7/8"X 5-1/2"VBRS TO 7"PIPE RAMS. PULL BOP I RISER AT SAME TIME AND CHANGEOUT AIR BOOTS. BARRIERS FOR RAM CHANGEOUT: CLOSED BLIND-SHEAR RAMS,10.3 PPG KILL WEIGHT FLUID,ANNULUS VALVES 23:30 - 00:00 0.50 BOPSUR P INTI PULL WEAR BUSHING.RUN IN HOLE WITH 7" TEST JOINT AND TEST PLUG. 3/9/2013 00:00 - 01:00 1.00 BOPSUR P INTI RIGUP TO PRESSURE TEST BOPE. FILL LINES,STACK AND TEST JOINT. 01:00 - 01:30 0.50 BOPSUB P INTI PRESSURE TEST 7"UPPER PIPE RAMS PER AOGCC AND AKDWOP STANDARDS TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH (PASSING TESTS,SEE ATTACHED CHART). 01-30 - 02.00 0.50 BOPSUR P INTI RIG DOWN BOP TESTING EQUIPMENT. 02:00 - 08:00 6.00 CASING P INTI _RIG UP TO RUN 7"INTERMEDIATE CASING AND HOLD AAR. MONITOR WELL WITH CONTINUOUS HOLE FILL ON TRIP TANK. HOLD PRE-JOB SAFETY MEETING FOR RUNNING PIPE WITH ALL INVOLVED PERSONNEL. DISCUSS PLAN FOR 'NON-SHEARABLES ACROSS BOP STACK. -CONVENTIONAL EQUIPMENT: STABBING BOARD,FRANKS TOOL,350 TON ELEVATORS, LONG BALES,DOYON SINGLE TONGS,PS-21 SLIPS W/7"INSERTS,SAFETY JOINT WITH CLOSED FOSV IN PIPE BARN,7"VAMTOP HC X 4-1/2"IF FOSV READY ON RIG FLOOR. -TWO DOYON CSG REPS ON LOCATION, PARKER DERRICKMAN WORKING ON STABBING BOARD. -REPAIR AIR BOOTS ON BOP RISER. 08:00 - 10:00 2.00 CASING P INTI MAKEUP SHOE TRACK RUN IN HOLE,AND CHECK FLOATS(PASS). RUN 7",26#,L-80, VAMTOP HC INTERMEDIATE CASING FROM 1 SURFACE TO 700'MD. TORQUE TURN EACH IVTHC CONNECTION TO 11950 FT-LBS -CENTRALIZERS INSTALLED ON JTS 1-22, 8966'MD-8053'MD SET DEPTH(TO COVER • CEMENTED INTERVAL) Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 30 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:OOAM !Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 10:30 0.50 CASING P INTI PERFORM RIG EVACUATION/H2S DRILL. H2S ALARMS SOUNDED,SECURE WELL, EVACUATE RIG,RE-ENTER RIG TO CONFIRM NO ACTUAL H2S GAS PRESENT. 10:30 - 12:00 1.50 CASING P INTI RUN 7",26#,L-80,VAMTOP HC INTERMEDIATE CASING FROM 700'MD TO 1575'MD,JOINT #39. TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS. -FILL CASING EVERY JOINT,BREAK CIRCULATION AND WASH EVERY 10TH JOINT DOWN AT 6 BPM OVER 3 MIN 12:00 - 12:30 0.50 CASING P INTI RIG CREW CHANGEOUT. CHECK WELL CONTROL EQUIPMENT AND ASSESS CASING RUNNING POSITIONS. • 12:30 - 13:00 0.50 CASING P INTI SERVICE RIG FLOOR EQUIPMENT AND PIPE CAT. 13:00 - 14:00 1.00 CASING N SFAL 1,575.00 INTI REPAIR PIPE CAT 14:00 - 18:30 4.50 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 1575'MD TO 4138'MD,JOINT# 100,TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS,AVERAGE 14 JTS/HR. FILL CASING EVERY JOINT,BREAK CIRCULATION AND WASH EVERY 10TH JOINT DOWN AT 6 BPM OVER 3 MIN 18:30 - 19:30 1.00 CASING P INTI HOLD TABLETOP KICK WHILE TRIPPING(D1) DRILL. DISCUSS EQUIPMENT REQUIREMENTS AND OPERATIONAL PLAN FOR STRIPPING SHEARABLE SAFETY JOINT INTO HOLE IF REQUIRED. CREW LUNCH. -CIRCULATE 2 ANNULAR VOLUMES AT 200 GPM,475 PSI 19:30 - 22:30 3.00 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 4138'MD TO 5790'MD,JOINT #140(9-5/8"WINDOWAT 5810'MD),TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS,AVERAGE 13 JTS/HR -FILL CASING EVERY JOINT,BREAK CIRCULATION AND WASH EVERY 10TH JOINT DOWN AT 6 BPM OVER 3 MIN 22:30 - 23:00 0.50 CASING P INTI CIRCULATE ONE BOTTOMS UP AT 9-5/8" WINDOW: 7 BPM,785 PSI,16%FLOW -2 BPM=425 PSI,10%FLOW -3 BPM=440 PSI,11%FLOW -4 BPM=475 PSI,12%FLOW -5 BPM=565 PSI,13%FLOW 6 BPM=680 PSI,14%FLOW 23:00 - 00:00 1.00 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 5790'MD TO 6205'MD AT MIDNIGHT,JOINT#150,TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS, PLOTTING PU/SO WEIGHTS ON BROOMSTICK PLOT. CONTINUE RUNNING CASING ON 3/10/2013. FILL CASING EVERY JOINT Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 31 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor.PARKER DRILLING CO. I UWI: Active datum:02-158 ACTUAL Q78.35usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/10/2013 00:00 - 01:00 1.00 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE I CASING FROM 6205'MD AT MIDNIGHT TO 6618'MD,JOINT#160. FRANK'S TOOL CUP FAILS. -FILL CASING EVERY JOINT,TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS, Pt.OTTING PU/SO WEIGHTS ON BROOMSTICK PLOT. 01:00 - 03:30 2.50 CASING N SFAL 8,618.00 INTI• CHANGEOUT FRANK'S TOOL CUP. RECIPROCATE PIPE IN 20'-40'INTERVALS. PICKUP WEIGHT=186 KLBS,SLACKOFF= 152 KLBS. FLUID LEVEL IN WELLBORE= STATIC. NOTE: DAYLIGHT SAVINGS"SPRING FORWARD"ACCOUNTS FOR ONE EXTRA HOUR DURING TIME,INTERVAL. 03:30 - 04:30 1.00 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 6618'MD TO 7032'MD,JOINT #170. SLACKOFF WEIGHTS INDICATE EXCESSIVE DRAG VERSUS MODELING(138 KLBS SLACKOFF VS—170 KLBS EXPECTED). -FILL CASING EVERY JOINT,TORQUE TURN 'EACH VTHC CONNECTION TO 11950 FT-LBS. 04:30 - 05:00 0.50 CASING P INTI CIRCULATE BOTTOMS UP AT 5 BPM WHILE RECIPROCATING FULL JOINT. CIRCULATING PRESSURE DROPS FROM 775 PSI TO 695 PSI. SLACKOFF WEIGHT IMPROVES BY 20 KLBS TO 158 KLBS. 05:00 - 10:00 5.00 CASING P INTI RUN 7",26#,L-80,VTHC INTERMEDIATE CASING FROM 7032'MD TO 8272'MD,JT#200, 160'ABOVE TOP OF HRZ,. AVERAGE 12 JTS/HR. WASH DOWN 4 JTS FROM 8272'MD TO TOP OF HRZ AT 8479'MD;5 BPM,800 PSI. RUN IN HOLE WITH FINAL 12 JTS 7"CASING FROM 8479'MD TO PLANNED SET DEPTH AT 18966'MD,NO FILL OR HOLE ISSUES ENCOUNTERED. -FILL CASING EVERY JOINT AND TORQUE TURN EACH VTHC CONNECTION TO 11950 FT-LBS,PLOTTING PU/SO WEIGHTS ON BROOMSTICK PLOT Y TOTAL 2116 JOINTS ALL-INCLUSIVE 7CASING=2 E TO HOURSRUN 8966', j 10:00 - 11:30 1.50 CASING P INTI !BREAK CIRCULATION AND STAGE UP PUMPS IN 1 BBL INCREMENTS TO 6 BPM,1140 PSI. I CIRCULATE ONE BOTTOMS UP. SHUT DOWN I PUMPS AND RIG DOWN FRANKS TOOL. RIG !UP DUAL PLUG CEMENT HEAD. 11:30 - 14:30 3.00 CEMT P INTI CIRCULATE HOLE CLEAN AND CONDITION MUD FOR CEMENTING AT 7 BPM,1075-825 PSI WHILE RECIPROCATING STRING IN 13' STROKES. PICKUP WEIGHT=260 KLBS, SLACKOFF=166 KLBS. MUD WEIGHT IN/OUT 10.3 PPG,YIELD POINT REDUCED FROM 20 I_TO 17 LBS/100FTA2 Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 32 of 43 Operation Summary Report Common Well Name 02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:30 2.00 CEMT P INTI HOLD PRE-JOB SAFETY MEETING WITH RIG AND CEMENTING CREW. CHANGEOUT SEAL IN RIG CEMENT LINE HAMMER UNION. PRESSURE TEST CEMENTING LINES WITH FRESH WATER TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH TO LEAK-TIGHT CRITERIA(PASS). BATCH MIX CEMENT 15:15-16:35 16:30 - 18:00 1.50 CEMT P INTI CEMENT 7"INTERMEDIATE CASING STRING AS FOLLOWS: I 16:40-SCHLUMBERGER PUMP 25 BBLS 11.0 PPG MUD PUSH AT 5 BPM,650 PSI. DROP BOTTOM PLUG. SLB PUMP 32.7 BBLS,158 SACKS,1.17 CUFT/SX 15.8 PPG CLASS G CEMENT W/GASBLOK ADDITIVE AT 5 BPM, 700 PSI(30%EXCESS). DROP TOP PLUG. SLB KICK OUT PLUG WITH 10 BBLS 8.4 PPG FRESH WATER. RIG PUMPS DISPLACE CEMENT WITH 10.3 PPG LSND MUD AT 7 BPM, ICP=700 PSI.FOR FIRST 320 BBLS,THEN DROP RATE TO 2 BPM FOR FINAL 8.8 BBLS. BUMP PLUG AT 17:51,615 PSI ON SCHEDULE WITH 340 BBLS. PRESSURE UP BEHIND PLUG TO 1110 PSI,500 OVER FINAL PRESSURE AND HOLD FOR 3 MINUTES. BLEED OFF AND CHECK FLOATS(HOLDING, NO SURFACE PRESSURE INSIDE OR ON BACKSIDE OF CASING). CASING STRING RECIPROCATED IN 13'STROKES DURING JOB EXCEPT WHEN MUD PUSH AND CEMENT EXIT CASING SHOE. PICKUP WEIGHT=260 KLBS, SLACKOFF=170 KLBS. ZONAL ISOLATION DOCUMENTATION(SEE ATTACHED SCHLUMBERGER REPORT AND WBE ACCEPTANCE FORM): -LIFT PRESSURE VERIFICATION METHOD FOR FIELD ESTIMATED TOC AT 7965'MD, 7426'TVD(814'TVD ABOVE TOP OF DISTINCT PERMEABLE ZONE PUT RIVER FORMATION AT 8795'MD,8240'TVD). WELLBORE ELEMENT HEIGHT=979'TVD. -ASSUMED HOLE SIZE=8-1/2"-BASED ON FIELD DATA -FINAL BUMP PRESSURE WITHIN 15%OF SLB CEMCADE MODEL PRESSURE(-650 PSI). JOB PRESSURE TRENDS IS SIMILAR TO PRE-JOB MODELING. -GREATER THAN 90%OF FLUID DENSITIES WITHIN 0.25 PPG OF PLAN. NO LOSSES TO FORMATION BEFORE OR DURING JOB. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 33 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (usft) 18:00 - 19:00 1.00 CASING P INTI PRESSURE TEST 7"INTERMEDIATE CASING TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN(PASSING TESTS,SEE ATTACHED CHART,AND DOCUMENTATION). AUTHORIZATION TO PROCEED WITH OPERATIONS RECEIVED FROM WELLS TEAM LEADER. CEMENT IN PLACE AT 19:00 ON 3/10/13 7"CASING SHOE AT 8966'MD,8405'TVD. FLOAT COLLAR AT 8881'MD. 19:00 - 00:00 5.00 CASING P INTI WAIT ON CEMENT TO REACH 50 PSI COMPRESSIVE STRENGTH PRIOR TO SPLITTING BOP STACK(PER CASING SLIPS 'SOP). WELL IS STATIC. RIG CREW WORKING ON FOLLOWING: PREVENTATIVE MAINTENANCE ON ST-80 IRON ROUGHNECK,TOP DRIVE,FORUM CRANE,AND DRAWWORKS ✓ -LAYDOWN 4 STANDS OF 4"AND 5"HWDP 'USING OFFLINE STAND BUILDER -CLEANING RIG AND PREPARING TOOLS FOR NIPPLING DOWN BOP STACK RIG DOWN CEMENTING HEAD 3/11/2013 00:00 - 03:00 3.00 CEMT P INTI WAIT ON CEMENT TO REACH 50 PSI COMPRESSIVE STRENGTH PRIOR TO SPLITTING BOP STACK(PER CASING SLIPS SOP). 8 HOURS FROM CEMENT IN PLACE AT 19:00 ON 3/10/13. WELL IS STATIC. RIG CREW WORKING ON FOLLOWING: -PREVENTATIVE MAINTENANCE ON ST-80 IRON ROUGHNECK AND DRAWWORKS -LAYDOWN REMAINING 5 STANDS OF 4"AND 5"HWDP USING OFFLINE STAND BUILDER DRAIN 7"CASING AND BOP STACK FROM RIG FLOOR TO WELLHEAD IN PREPARTION FOR BOP NIPPLE DOWN AND CASING CUT. PULL MOUSEHOLE. -REVIEW RECENT RIG INCIDENTS AND MITIGATIONS IN PLACE 03:00 - 04:30 1.50 BOPSUR P INTI NIPPLE DOWN BOP STACK RISER AT CASING HEAD. BLEED OFF AIR BOOTS AND LIFT STACK.. -BARRIERS TO NIPPLE DOWN STACK CEMENT AT 50 PSI COMPRESSIVE STRENGTH,STATIC FLUID COLUMN 10.3 PPG MUD INSIDE AND OUTSIDE 7"CASING(PER CASING SLIPS SOP). 04:30 - 10:00 5.50 CASING P INTI PICKUP ON 7"CASING TO 300 KLBS(50 KLBS OVER STRING WEIGHT)AND INSTALL CAMERON/MCEVOY TYPE SB-3-N-L 10"X 7" CASING SLIPS. HANG OFF 7"INTERMEDIATE CASING IN TENSION ON SLIPS. RIG UP CAMERON WACHS CUTTER AND CUT 7" CASING AT 4-3/4"ABOVE TOP OF CASING FLANGE,43.98'FROM RIG FLOOR(LEAVING 28.36'OF CUT JOINT BELOW WELLHEAD). LAYDOWN 7"CASING PUPS AND 13.06'CUT JOINT. MOVE BOP STACK WITH RISERS TO SIDE WITH BRIDGE CRANES. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 34 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) • (usft) 10:00 - 11:00 1.00 CASING P INTI RIG DOWN 350 TON ELEVATORS AND CHANGEOUT BAILS FROM LONG TO SHORT. 11:00 - 14:30 3.50 WHSUR P INTI INSTALL NEW CAMERON'T2S'13-5/8"5000 PSI STUDDED BOTTOM X 13-5/8"FLANGED TOP TUBING SPOOL WITH 7"CASING PACKOFF. INSTALL SECOND GATE VALVE ON WORKING INNER ANNULUS OUTLET. CAMERON PRESSURE TEST 7"PACKOFF TO 250 PSI LOW FOR 5 MIN AND 4300 PSI HIGH FOR 30 MIN(PASSING TESTS,SEE ATTACHED CHART) • 14:30 - 21:00 6.50 BOPSUR P INTI CHANGEOUT RISER SPACER SPOOLS AT BASE OF BOP STACK. NIPPLE UP BOP STACK WITH RISERS TO TUBING SPOOL. CENTER AND SECURE STACK WITH TURNBUCKLES. CHANGEOUT UPPER RAMS FROM 7"FIXED RAMS TO 2-7/8"X 5-1/2" VARIABLE BORE RAMS. INSTALL BELL NIPPLE. SIMOPS: FREEZE PROTECT 9-5/8"X 7" OUTER ANNULUS TO 2300'TVD -BULLHEAD 70 BBLS OF 10.3 PPG LSND MUD. 1 BPM=1030 PSI,3 BPM=1250 PSI ICP,1150 PSI FCP. -BULLHEAD 65 BBLS 90°F 6.8 PPG DIESEL AT 2 BPM,ICP=1100 PSI,FCP=1500 PSI. SHUT-IN WELL WITH INITIAL 700 PSI. CALCULATED UNDERBALANCE TO 9.8 CRETACEOUS FORMATION AT 9-5/8"WINDOW 5810'MD,5372'TVD=420 PSI. 21:00 - 22:30 1.50 BOPSUR P INTI RIG UP BOPE TESTING EQUIPMENT. RUN IN HOLE WITH 4"TEST JOINT AND TEST PLUG. FILL SURFACE LINES. BEGIN LOADING PITS WITH POWERPRO MUD FOR NEXT HOLE SECTION. 22:30 - 23:30 1.00 BOPSUR N WAIT 8,966.00 INTI UNANNOUNCED FIRE/RIG EVACUATION DRILL DUE TO FALSE FIRE ALARM IN MUD MODULE. HOLD AFTER ACTION REVIEW WITH RIG TEAM. 23:30 - 00:00 0.50 BOPSUR P INTI BEGIN PRESSURE TESTING BOPE. TEST DETAILS IN NEXT TIME ENTRY ON 3/12/2013 DAILY REPORT. 3/12/2013 00:00 - 03:30 3.50 BOPSUR P INTI PRESSURE-FUNCTION BOPE PER AOGCC REGULATIONS AND BP GLOBAL WELLS PRACTICES TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH. STATE OF ALASKA'S RIGHT TO WITNESS TEST WAIVED BY REPRESENTATIVE BOB NOBLE. -ALL TESTS WITH 4"TEST JOINT -SEE ATTACHED CHARTS AND REPORT,ALL PASSING TESTS. -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. -H2S AND LEL GAS ALARMS CALIBRATED AND TESTED. -BOP COMPONENTS FUNCTIONED FROM ALL THREE CONTROL PANELS: RIG MANAGER'S OFFICE,LER,ACCUMULATOR Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 35 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UN, Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:00 0.50 BOPSUR P INTI INSTALL WEAR BUSHING,ID=9". RIG DOWN BOP TESTING EQUIPMENT. 04:00 - 07:00 3.00 EVAL P INTI MOVE IN RIG UP HALLIBURTON E-LINE UNIT. LOAD GYRODATA TOOLS TO RIG FLOOR. RIG UP LINE WIPER AT RIG FLOOR,NO PRESSURE CONTROL EQUIPMENT REQUIRED. 07:00 - 10:30 3.50 EVAL P INTI RUN IN HOLE WITH GYRO SURVEY TOOLS FROM SURFACE TO TIE-IN POINT AT 5789'MD. LOG ACROSS DRILLING INC+TREND DEPTH FROM 5789'MD TO 6400'MD. PULL OUT OF HOLE WITH GYRO TOOLS. 10:30 - 11:00 0.50 EVAL P INTI RDMO HALLIBURTON E-UNE UNIT AND GYRODATA TOOLS. 11:00 - 13:00 2.00 DRILL P INTI CHANGEOUT TOP DRIVE SAVER SUB. 13:00 - 13:30 0.50 DRILL P INTI SERVICE TOP DRIVEAND BLOCKS 13:30 - 18:00 4.50 DRILL P INTI MAKEUP AND RUN IN HOLE WITH 6-1/8" DIRECTIONAL ASSEMBLY FROM SURFACE TO BHA OVERALL LENGTH AT 297'MD. SLB MWD REPS LOAD NUCLEAR SOURCES IN TOOL. TOTAL BHA WEIGHT=44 KLBS -6-1/8"HALLIBURTON MM64D PDC BIT,W/ 6-10/32"JETS,SERIAL#1216.201 -4-3/4"SLB POWERPAK AD 1.5°BENT MUD MOTOR WITH PORTED FLOAT -DIR/GR/RES/NEU/DEN(STABILIZED ADN) -HYDRAULIC DRILLING JARS 18.00 - 19:00 1.00 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DRILLING ASSEMBLY FROM BHA AT 297'MD TO SHALLOW HOLE TEST DEPTH AT 1056'MD. 19:00 - 19:30 0.50 DRILL' - P INTI SHALLOW TEST TOOLS AT 225 GPM,1040 PSI (PASS,185 PSI,15%,LOWER THAN MODELED 1225 PSI) 19:30 - 00:00 4.50 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DRILLING ASSEMBLY FROM 1056'MD TO 5975'MD AT MIDNIGHT,FILLING PIPE EVERY 20 STANDS. 3/13/2013 09:30 - 10:30 1.00 DRILL N WAIT 8,986.00 INTI FIRE ALARM IN DRILL MODULE CARRIER BAY DUE TO STEAM. NON-ESSENTIAL PERSONNEL EVACUATE RIG AND MUSTER. HOLD AAR. MONITOR WELL(STABLE). 00.00 - 03:30 3.50 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DRILLING ASSEMBLY FROM 5975'MD AT MIDNIGHT TO 18646'MD(235'ABOVE FLOAT COLLAR), FILLING PIPE EVERY 20 STANDS. HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL BY MANIPULATING FLOW PADDLE, FOLLOWED BY AAR WITH RIG CREW. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 36 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:30 1.00 DRILL P INTI WASH DOWN WITH 6-1/8"DRILLING ASSEMBLY FROM 8646'MD TO TAG CEMENT STRINGERS AT 8850'MD(EXPECTED FLOAT COLLAR AT 8881'MD);85 GPM,815 PSI. • PICKUP WEIGHT=178 KLBS,SLACKOFF= 130 KLBS. ESTABLISH ROTATION. WASH AND REAM DOWN AT 40 RPM,5 KLBS WOB, 200 GPM,1700 PSI TO TAG FLOAT COLLAR AT 8882'MD. SLOW PUMP RATES AT 8881'MD,10.3 PPG: MP1: 20 SPM=860 PSI,30 SPM=1070 PSI,40 SPM=1350 PSI MP2: 20 SPM=785 PSI,30 SPM=1005 PSI,40 SPM=1300 PSI 04.30 - 07:00 2.50 DRILL P INTI DRILL OUT PLUGS AND SHOE TRACK CEMENT FROM FLOAT COLLAR AT 8881'MD TO 8960'MD(6'ABOVE 7"CASING LANDING • DEPTH. -5 KLBS WOB,100-200 PSI DIFFERENTIAL,40 RPM,6-8 KFT-LBS TORQUE ON BOTTOM,5-6 KFT-LBS OFF BOTTOM,200 GPM,1800 PSI ON BOTTOM,1600 PSI OFF BOTTOM. PLUGS •TAKE APPROXIMATELY 1 HOUR TO DRILL THROUGH(RUBBER OBSERVED ACROSS SHAKERS AT FIRST BOTTOMS UP). 07:00 - 08:30 1.50 DRILL P INTI I DISPLACE WELL FROM 10.3 PPG LSND WBM TO 8.5 PPG SOLIDS FREE POWERPRO MUD SYSTEM;235 GPM,2275 PSI INITIAL,1100 PSI FINAL CIRCULATING PRESSURE. SLOW PUMP RATES AT 8960'MD,8.5 PPG: MP1: 20 SPM=355 PSI,30 SPM=495 PSI,40 1 SPM=670 PSI MP2: 20 SPM=350 PSI,30 SPM=498 PSI,40 SPM=655 PSI 08:30 - 09:30 1.00 DRILL P INTI CLEANOUT UNDER SHAKERS. PREPARE PIT SYSTEM FOR NEW SOLIDS FREE POWERPRO. 10:30 - 11:30 1.00 DRILL P INTI DRILL OUT REMAINING 6'OF SHOE TRACK+ 20'NEW FORMATION FROM 8961'MD TO 8986' MD. -250 GPM,1200 PSI,5-10 KLBS WOB,40 RPM, 4-5.5 KFT-LBS TORQUE ON BOTTOM. PICKUP WEIGHT=164 KLBS,SLACKOFF=154 KLBS, ROTATING=159 KLBS. HOLD UNANNOUNCED KICK WHILE DRILLING (D2)DRILL BY BLEEDING FLUID INTO ACTIVE PIT SYSTEM,FOLLOWED BYAAR WITH RIG TEAM. 11:30 - 13:30 2.00 DRILL P INTI CIRCULATE HOLE CLEAN WITH 30 BBL HI-VIS STEEL LUBE SWEEP(DUMP OVERBAORD); 250 GPM,1225 PSI,35 RPM,4.5 KFT-LBS, RECIPROCATING PIPE. MW IN/OUT=8.5 PPG. • 13:30 - 14:00 0.50 DRILL P INTI PERFORM FORMATION INTEGRITY TEST TO 11.0 PPG EMW(1100 PSI APPLIED SURFACE PRESSURE,SEE ATTACHED CHART): • -7"CASING SHOE AT 8966'MD,8400'TVD,8.5 PPG: (11.0-8.5)*(0.052*8400'TVD=1092 PSI Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 37 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 00:00 10.00 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PRODUCTION HOLE SECTION FROM 8986'MD TO 9173'MD AT MIDNIGHT(187'IN 10 HRS=19 FPH). -250 GPM,1200 PSI OFF BOTTOM,1300-1400 PSI ON BOTTOM,40 RPM,123 BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM TORQUE,5-10 KLBS WOB. -MW IN/OUT=8.5 PPG,41 SEC/QT,NO LOSSES TO FORMATION. -SLIDE DRILLING PER DD,HIGH SIDE 60 FT/STAND,TO ACHIEVE 8 DEGREE PER 100 BUILD RATE. FORMATION TOPS: SHUBLIK: 8998'MD,8431'TVD(4'HIGH) TSAD(ZONE 4): 9074'MD,8504'TVD(4'HIGH) ACTUAL DRILLING HRS FOR PAST 24 HOURS =4.25 SLIDING=1.99 HRS,ROTATING=2.26 HRS SLOW PUMP RATES AT 9173'MD,8.5 PPG: MP1: 20 SPM=410 PSI,30 SPM=540 PSI,40 SPM=685 PSI MP2: 20 SPM=390 PSI,30 SPM=515 PSI,40 SPM=680 PSI 3/14/2013 00:00 - 03:00 3.00 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PRODUCTION HOLE SECTION FROM 9173'MD AT MIDNIGHT TO TOP OF ZONE 3(TCGL)AT 9274'MD(101' IN 3 HRS=34 FPH WITH CONNECTIONS). -250 GPM,1200 PSI OFF BOTTOM,1250-1350 PSI ON BOTTOM,40 RPM,123 BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM TORQUE,5-10 KLBS WOB. -MW IN/OUT=8.5 PPG,41 SEC/QT,NO LOSSES TO FORMATION. -SLIDE 18'-28'PER JOINT AT HIGHSIDE 03:00 - 07:00 4.00 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PRODUCTION HOLE SECTION FROM TCGL AT 9274'MD TO BCGL(ZONE 3)AT 9357'MD(83'IN 4 HOURS= 21 FPH WITH CONNECTIONS). -250 GPM,1200 PSI OFF BOTTOM,1225-1350 PSI ON BOTTOM,5-10 KLBS WOB. -ROTATING PARAMETERS REDUCED TO 20 RPM,220 GPM,93 TOTAL BIT RPM,1200 PSI, 5 KFT-LBS OFF BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM TORQUE,THROUGH CONGLOMERATES FOR BIT PRESERVATION -MW IN/OUT=8.5 PPG,40 SEC/QT,NO LOSSES TO FORMATION. -SLIDE 26-29'PER JOINT AT 15R-20R. DIFFICULT TO MAINTAIN TOOLFACE FORMATION TOP: ZONE 3(TCGL): 9274'MD,8689'TVD(4'HIGH) HOLD UNANNOUNCED KICK WHILE DRILLING (D1)DRILL AND AFTER ACTION REVIEW. MANIPULATE FLOW PADDLE TO SIMULATE FLOW INCREASE. PROMPT RIG CREW TO PROPERLY FLOWCHECK WELL AND CONFIRM NO FLOW. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 38 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 18:00 11.00 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PRODUCTION HOLE SECTION FROM TOP OF ZONE 2 AT 9357'MD TO 9607'MD(250'IN 11 HRS=23 FPH WITH CONNECTIONS) -250 GPM,1250 PSI OFF BOTTOM,1300-1400 PSI ON BOTTOM,30-40 RPM,113-123 BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE,8-10 KLBS WOB. -MW IN/OUT=8.5 PPG,38 SEC/QT,NO LOSSES TO FORMATION. SLIDE 22'-29'PER JOINTAT45L-10R. MOTOR YIELDING 11-13°/100'DLS -INCREASE LUBE 776 CONCENTRATION FROM 1.5%TO 1.75% FORMATION TOP: ZONE 2: 9357'MD,8761'TVD(8'LOW) SLOW PUMP RATES AT 9498'MD,8.5 PPG: MP1: 20 SPM=380 PSI,30 SPM=505 PSI,40 SPM=665 PSI MP2: 20 SPM=360 PSI,30 SPM=500 PSI,40 SPM=665 PSI 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 9607'MD TO 9731'MD AT MIDNIGHT(124'IN 6 HRS=21 FPH WITH CONNECTIONS). -250 GPM,1250 PSI OFF BOTTOM,1300-1400 PSI ON BOTTOM,40 RPM,123 BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE,5-10 KLBS WOB. -MW IN/OUT=8.5 PPG,39 SEC/QT,NO LOSSES TO FORMATION. -SLIDE 22'-27'PER JOINT AT 15L-10R. FORMATION TOP: ZONE 1 (PRODUCTION TARGET): 9689'MD, 8973'TVD(3'HIGH) ACTUAL DRILLING HRS FOR PAST 24 HOURS =9.27 SLIDING=7.8 HRS,ROTATING=1.47 HRS SLOW PUMP RATES AT 9731'MD,8.5 PPG: MP1: 20 SPM=400 PSI,30 SPM=515 PSI,40 SPM=670 PSI MP2: 20 SPM=420 PSI,30 SPM=537 PSI,40 SPM=680 PSI Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 39 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date!Time:6/18/1980 12:00.00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/15/2013 00:00 - 15:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 9731'MD AT MIDNIGHT TO HORIZONTAL LANDING DEPTH AT 10034' MD(303'IN 15 HRS=20 FPH WITH CONNECTIONS). -250 GPM,1250 PSI OFF BOTTOM,1350-1550 PSI ON BOTTOM,40 RPM,123 BIT RPM,4 KFT-LBS OFF BOTTOM TORQUE,5 KFT-LBS ON BOTTOM TORQUE,6-10 KLBS WOB. AVERAGE 100 FPH ON BOTTOM ROTATING, 30-55 FPH ON BOTTOM SLIDING MW IN/OUT=8.5 PPG,39 SEC/QT,NO LOSSES TO FORMATION. -SLIDE 14'-24"PER JOINT AT 20L TO 30R. MOTOR YIELDING 10-11°/100'DLS -INCREASE MUD SYSTEM LUBE 776 CONCENTRATION FROM 1.75%TO 2%AT 9750'MD,THEN TO 2.5%AT 9860'MD. SLIDING CONDITIONS IMPROVE. FORMATION TOP: HMO AT 10034'MD,9051'TVD LAND HORIZONTAL AT 92°INCLINATION AT 10034'MD,9051'TVD 15:00 - 22:00 7.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM HORIZONTAL LANDING DEPTH AT 10034'MD TO 10269'MD(235'IN 7 HRS=34 FPH WITH CONNECTIONS) -250 GPM,1300 PSI OFF BOTTOM,1400-1600 PSI ON BOTTOM,40 RPM,123 BIT RPM,4 KFT-LBS OFF BOTTOM TORQUE,5 KFT-LBS ON BOTTOM TORQUE,6-10 KLBS WOB. -AVERAGE 75-95 FPH ON BOTTOM ROTATING,15-40 FPH ON BOTTOM SLIDING -MW IN/OUT=8.5 PPG,39 SEC/QT,NO LOSSES TO FORMATION. -SLIDE 15'-45'PER STAND AT 30L TO LS. 22:00 - 23:00 1.00 DRILL N WAIT 10,269.00 PROD1 SECURE WELL AND EVACUATE RIG DUE TO FAULTY H2S GAS ALARM IN MAC AIR HEATER ROOM ON TOP OF MUD MODULE. CONFIRM NO PRESENCE OF GAS PRIOR TO RE-ENTERING RIG. HOLDAAR WITH RIG TEAM.SEE TR@CTION#4375993 23:00 - 00:00 1.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HOLE FROM 10269' MD TO 10275'MD. SAME PARAMATERS AS PREVIOUS DRILLING TIME ENTRY. ACTUAL DRILLING TIME FOR PAST 24 HOURS =11.5 HRS SLIDING=8.17 FIRS,ROTATING=3.33 HRS SLOW PUMP RATES AT 10275'MD,8.5 PPG: MP1: 20 SPM=415 PSI,30 SPM=540 PSI,40 SPM=700 PSI MP2: 20 SPM=400 PSI,30 SPM=535 PSI,40 SPM=708 PSI Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 40 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/16/2013 00:00 - 03:00 3.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 10275'MD 10345'MD. 250 GPM,1350 OFF BOTTOM,1400-1600 PSI ON BOTTOM,40 RPM,123 BIT RPM,4 KFT-LBS OFF BOTTOM TORQUE,5 KFT-LBS ON BOTTOM TORQUE,8-10 KLBS WOB. -MW IN/OUT=8.5 PPG,39 SEC/QT,NO LOSSES TO FORMATION. 03:00 - 04:00 1.00 DRILL P PROD1 FLOW CHECK,OBSERVE AERATED MUD. CIRCULATE BOTTOMS UP;250 GPM,1310 PSI, RECIPROCATING FULL STAND,20 RPM,3-4 KFT-LBS TORQUE NO PIT GAIN,NO INCREASE IN FLOW -CLEAN 8.5 PPG MUD IN/OUT AT BOTTOMS UP -FLOW CHECK AFTER CIRCULATING IS STABLE SERVICE TOP DRIVE AND PERFORM DERRICK INSPECTION. 04:00-DOWN-LINK TO LWD TOOLS TO REDUCE RESISTIVITY DATA RECORDING RATE. 04:00 - 18:00 14.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 10345'MD TO 11131'MD (786'MD IN 14 HRS=56 FPH WITH CONNECTIONS). -250 GPM,1500 PSI OFF BOTTOM PRESSURE,1600-1750 PSI ON BOTTOM,80 RPM,163 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,6.5-9.5 KFT-LBS ON BOTTOM,5-10 KLBS WOB -AVERAGE 100 FPH ON BOTTOM ROTATING, 35-50 FPH ON BOTTOM SLIDING. -MW IN/OUT=8.6 PPG,38 SEC/QT,NO LOSSES TO FORMATION. SLOW PUMP RATES AT 10600'MD,8.6 PPG: MP1: 20 SPM=465 PSI,30 SPM=590 PSI,40 SPM=772 PSI MP2: 20 SPM=470 PSI,30 SPM=598 PSI,40 SPM=777 PSI Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 41 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-01 OHM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL HOLE SECTION FROM 11131'MD TO 11392'MD AT MIDNIGHT(261'IN 6 HRS=44 FPH WITH CONNECTIONS. -250 GPM,1425 PSI OFF BOTTOM PRESSURE,1550-1700 PSI ON BOTTOM,40 RPM,123 TOTAL BIT RPM,5 KFT-LBS OFF 'BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM, 5-10 KLBS WOB AVERAGE 90-100 FPH ON BOTTOM ROTATING,AVERAGE 45-75 FPH ON BOTTOM SLIDING. -MW IN/OUT=8.6 PPG,38 SEC/QT. NO LOSSES TO FORMATION. SLIDING 20'-25'PER JOINT TO BUILD ANGLE FROM 90°TO 101°FOR ZONE 1B TOE 20:45-DOWNLINK TO BHA TO ACTIVATE ORION RECORDING SYSTEM FOR RESISTIVITY DATA. ACTUAL DRILLING TIME FOR PAST 24 HOURS =14.03 HRS SLIDING=5.3 HRS,ROTATING=9.5 HRS SLOW PUMP RATES AT 11392'MD,8.6 PPG: MP1: 20 SPM=470 PSI,30 SPM=605 PSI,40 SPM=793 PSI MP2: 20 SPM=495 PSI,30 SPM=642 PSI,40 SPM=823 PSI 3/17/2013 00:00 - 10:30 10.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"HORIZONTAL HOLE SECTION FROM 11392'MD TO WELL TOTAL DEPTH 11740'MD,9010'TVD, (348'IN V 10.5 HRS=33 FPH WITH CONNECTIONS). 250 GPM,1400-1500 PSI OFF BOTTOM PRESSURE,1550-1800 PSI ON BOTTOM,40-80 RPM,123-163 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM, 4-12 KLBS WOB -AVERAGE 50-125 FPH ON BOTTOM ROTATING,AVERAGE 30-45 FPH ON BOTTOM SLIDING. -MW IN/OUT=8.6 PPG,39 SEC/QT. NO LOSSES TO FORMATION. ACTUAL DRILLING TIME FOR PAST 24 HOURS =5.47 HRS SLIDING=2.81 HRS,ROTATING=2.66 HRS TOTAL BIT HOURS=45.34,TOTAL FOOTAGE= 2774',CUMULATIVE ROP=61 FPH SLOW PUMP RATES AT 11585'MD,8.6 PPG: MP1: 20 SPM=495 PSI,30 SPM=630 PSI,40 SPM=805 PSI MP2: 20 SPM=498 PSI,30 SPM=630 PSI,40 SPM=802 PSI Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 42 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 14:30 4.00 DRILL P PROD1 CIRCULATE HOLE CLEAN WITH ONE 35 BBL HI-VIS SWEEP AND FOUR TOTAL BOTTOMS !UP FOR TRIPPING AND RUNING LINER;250 GPM,1400-1525 PSI,80-100 RPM,4-5 KFT-LBS TORQUE, SHAKERS ARE CLEAN AT END OF CIRCULATING. SLOW PUMP RATES AT 11740'MD,8.6 PPG: MPI: 20 SPM=480 PSI,30 SPM=635 PSI,40 SPM=835 PSI MP2: 20 SPM=485 PSI,30 SPM=650 PSI,40 _ SPM=840 PSI 14:30 - 15:00 0.50 DRILL P PROD1 SHOOT FOUR-POINT DEVIATION SURVEYS PER DIRECTIONAL DRILLER. FLOWCHECK !WELL PRIOR TO PULL OFF BOTTOM !(STABLE). 15:00 - 16:30 1.50 DRILL P PROD1 PULL OUT OF HOLE FROM WELL TOTAL DEPTH AT 11740'MD TO 10393'MD ON ELEVATORS,RACKING BACK 4"DRILLPIPE. MAX PICKUP WEIGHT OFF BOTTOM=185 • KLBS,SLACKOFF=148 KLBS. HOLE TAKING CORRECT FILL. 16:30 - 00:00 7.50 DRILL - P PROD1 MAD PASS LOG(BACKREAM AND WASH)OUT i OF THE HOLE FROM 10393'MD TO 9250'MD AT MIDNIGHT(7"CASING SHOE AT 8966'MD); 360 FT/HR,250 GPM,1250-1400 PSI,40 RPM,4 KFT-LBS TORQUE. NO OPENHOLE ISSUES ENCOUNTERED. 3/18/2013 00:00 - 02:00 2.00 DRILL P PROD1 MAD PASS LOG(BACKREAM AND WASH)OUT OF THE HOLE FROM 9250'MD AT MIDNIGHT TO 7"CASING SHOE AT 8966'MD;360 FT/HR, 250 GPM,1200-1300 PSI,40 RPM,3.5 KFT-LBS TORQUE. NO OPENHOLE ISSUES ENCOUNTERED. 02:00 - 03:00 1.00 DRILL P PROD1 CIRCULATE HOLE CLEAN AT 7"CASING SHOE WITH ONE BOTTOMS UP;250 GPM,1200-1300 PSI,100 RPM,3-4 KFT-LBS TORQUE, RECIPROCATING PIPE 30'AT BASE OF 7" CASING. FLOWCHECK WELL AT THE CASING SHOE(STABLE). PUMP DRY JOB AND DROP 2.4"DRILLPIPE DRIFT(IN PREPARATION FOR _ LINER RUN). 03:00 - 09:00 6.00 DRILL P PROD1 I TRIP OUT OF THE HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM 7"SHOE AT 18966'MD TO 1720'MD,RACKING BACK 4" DRILLPIPE. HOLD UNANNOUNCED KICK WHILE TRIPPING (D1)DRILL BY MANIPULATING THE FLOW PADDLE. FOLLOWUP WITH RIG TEAM AFTER ACTION REVIEW. 09:00 - 09:30 0.50 DRILL P PROD1 SERVICE TOP DRIVE,IRON DERRICKMAN AND IRON ROUGHNECK(ST-80). 09:30 - 11:30 2.00 DRILL P PROD1 TRIP OUT OF THE HOLE WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM 1720'MD TO BHA AT 297'MD,RACKING BACK 4" DRILLPIPE. HOLD PRE-JOBS SAFETY MEETING FOR HANDLING RADIOACTIVE SOURCES AND LAYING DOWN BHA. FLOWCHECK WELL PRIOR TO PULLING THROUGH STACK(STABLE). Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 43 of 43 Operation Summary Report Common Well Name:02-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/8/2013 End Date:3/18/2013 X3-010HM-C:DRILL(9,889,979.25) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UW: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 14:00 2.50 DRILL P PROD1 LAYDOWN 6-1/8"DRILLING ASSEMBLY. RECOVER 2.4"DRILLPIPE DRIFT. SLB MWD !REPS UNLOAD RADIOACTIVE SOURCE FROM LWD TOOLS. GRADE BIT 0-3-IN GAUGE,SEE ATTACHED PHOTO. 14:00 -- 14:30 0.50 DRILL P PROD1 1 CLEAR AND CLEAR RIG FLOOR AFTER TRIPPING. END DRILLING EVENT AT 14:30 HRS. BEGIN COMPLETION EVENT. Printed 4/9/2013 10:25:17AM North America-ALASKA-BP Page 1 of 8 Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) I Start Date:3/18/2013 End Date:3/26/2013 1X3-010HM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 1 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. I UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task ' Code , NPT NPT Depth Phase Description of Operations (hr) (usft) 3/18/2013 14:30 - 15:00 0.50 BOPSUR P RUNPRD BEGIN COMPLETION EVENT WITH PA RKER 273 RIG AT 14:30 HRS. PULL WEAR BUSHING. 15:00 - 17:30 2.50 BOPSUR P RUNPRD 1RIG UP TO PRESSURE TEST ROPE. FILL MUD GAS SEPARATOR WITH 13.4 BBLS. MAKEUP ,AND RUN IN HOLE WTIH 2-7/8"TEST JOINT AND TEST PLUG. FILL ALL LINES AND BOP STACK. 17:30 - 22:00 4.50 BOPSUR P RUNPRD PRESSURE TEST BOPE TO AOGCC ,REQUIREMENTS AND BP DWOP STANDARDS TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH. STATE OF ALASKA'S RIGHT TO WITNESS TEST WAIVED BY JOHN CRISP. !-TEST VARIABLE BORE RAMS WITH 2-7/8" U elAND 4-1/2"TEST JOINTS -TEST ANNULAR PREVENTER WITH 2-7/8" TEST JOINT. -SEE ATTACHED CHARTS AND REPORT,ALL PASSING TESTS. -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. -H2S AND LEL GAS ALARMS CALIBRATED AND TESTED. -BOP COMPONENTS FUNCTIONED FROM ALL THREE CONTROL PANELS: RIG MANAGER'S OFFICE,LER,ACCUMULATOR 22:00 - 23:00 1.00 BOPSUR P RUNPRD 1RIG DOWN BOP TESTING EQUIPMENT. INSTALL WEAR BUSHING. II 23:00 - 00:00 1.00 CASING P RUNPRD RIG UP TO RUN 4-1/2"LINER. I-LOAD CENTRALIZERS TO RIG FLOOR. RIG 'UP FILL UP LINE OFF MUD MANIFOLD. RIG UP DOYON CASING TONGS. CONFIRM PIPE COUNT IN PIPE BARN. MAKEUP WELL CONTROL EQUIPMENT. CHANGEOUT 'INSERTS IN BX ELEVATORS. RIG UP PS-21 SLIPS. 3/19/2013 00:00 - 02:00 2.00 CASING P RUNPRD RIG UP TO RUN 4-1/2"LINER. -LOAD CENTRALIZERS TO RIG FLOOR. RIG UP FILL UP LINE OFF MUD MANIFOLD. RIG 1 UP DOYON CASING TONGS. CONFIRM PIPE COUNT IN PIPE BARN. MAKEUP WELL CONTROL EQUIPMENT. CHANGE OUT INSERTS IN BX ELEVATORS. RIG UP PS-21 SLIPS. HOLD UNANNOUNCED KICK WHILE TRIPPING (D1)DRILL BY MANIPULATING FLOW PADDLE WHILE OUT OF THE HOLE. 02:00 - 02:30 0.50 CASING P RUNPRD HOLD DRILLAAR AND PRE-JOB SAFETY MEETING FOR RUNNING LINER WITH BAKER, DOYON CASING AND RIG TEAM. Printed 4/9/2013 10:26:18AM North America-ALASKA-BP Page 2 of 8 Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date:3/26/2013 'X3-010HM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12.00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 07:00 4.50 CASING P RUNPRD MAKEUP AND RUN IN HOLE WITH SHOE TRACK(FIRST THREE JOINTS)FROM SURFACE TO 128'MD. CHECK FLOATS (PASS). BAKER-LOCK SHOE TRACK. RUN IN HOLE WITH 4-1/2",12.6#,13CR-85,VAMTOP HT PRODUCTION LINER FROM 128'MD TO 1436'MD. TORQUE TURN VAMTOP CONNECTIONS TO OPTIMUM MU TORQUE OF 4440 FT-LBS. FILL PIPE ON FLY AND TOP OFF EVERY 10 JOINTS WITH 8.6 PPG POWERPRO MUD. 07:00 - 07:30 0.50 CASING N SFAL 1,436.00 RUNPRD RID AND C/O POWER TONGS(BACKUP CYLINDER FAILURE) 07:30 - 10:00 2.50 CASING P RUNPRD CONT RUN IN HOLE WITH 4-1/2",12.6#, 13CR-85,VAMTOP HT PRODUCTION LINER FROM 1436'MD TO 2754'MD. TORQUE TURN VAMTOP CONNECTIONS TO OPTIMUM MU TORQUE OF 4440 FT-LBS. FILL PIPE ON FLY AND TOP OFF EVERY 10 JOINTS WITH 8.6 PPG POWERPRO MUD. 10:00 - 11:00 1.00 CASING _N SFAL 2,754.00 RUNPRD CHANGE OUT JOINT#70 FOR JOINT#88 DUE TO FAILED MAKE UP;CONT RUN OF 4-1/2 F/ 2754 TO 2835'MD 11:00 - 12:00 1.00 CASING P RUNPRD C/O BX ELEVATOR INSERTS TO 4";P/U M/U LINER HANGER AND WIPER PLUG;ADD PAL MIX TO HANGER 12:00 - 12:30 0.50 CASING P RUNPRD M/U CROSSOVER SUBS AND PUP TO DRILL PIPE 12:30 - 13:00 0.50 CASING P RUNPRD SERVICE RIG 13:00 - 14:00 1.00 CASING P RUNPRD RIH TO 2982,CIRC;STAGE UP TO 6BPM(81ICP=282 PSI,FCP=269PSI,50 BBLS/496 STKS,P/U 73K,S/O 68K 14:00 - 20:00 6.00 CASING P RUNPRD TIH F/2982 TO 8960:FILL PIPE EVERY 10 STANDS;CHECK P/U AND S/O WT EVERY 10 STANDS,@3836'-P/U=84K,S/0=80K;4785 PN=95K,S/0=92K;5734 P/U=104K,5/0=104K; 6683 P/U=119,5/0=114K;7632 P/U=134K,S/0=126K;8486 P/U=144K,S/0=132K 20:00 - 21:00 1.00 CASING P RUNPRD CONDITION MUD AND CIRC @ CASING SHOE 8960,200 BBLS/2000STKS,STAGE UP TO 6BPM,ICP 640 PSI,FCP=700 PSI,BBLS IN=BBLS OUT,P/U=158K,S/0=140K 21:00 - 23:00 2.00 CASING P RUNPRD RIH F/8960 TO 11711 FILL PIPE EVERY 10 STDS, CHECK P/U AND S/O WT EVERY 10 STANDS @9909 PN=170K,S/0=138K;10953 P/U=175K,S/0=140K;11711 P/U=180K, S/0=145K 23:00 - 00:00 1.00 CASING P . RUNPRD I BLOW DN TOP DRIVE,P/U AND M/U BAKER CEMENT HEAD,CROSS-OVER AND SINGLE DRILL PIPE, TAG BOTTOM©11740,P/U TO BREAKOVER @ 180K AND MARK PIPE,P/U 2 j FT AND START CIRC AT.5 BBL/PM AND INCREASE TO 3 BB/PM Printed 4/9/2013 10:26:18AM 7,171--,:'-',;! 4tI',';,,,,:.,-'r'' 4:Q .d b ^fN' "sndat vim +°. Com° s,�' <,.,.„ ` '? *mr ',!*iM' , 8 e f North Amer- ���^' �� g ir „ ` ? v 5`* z ""��* ,ova a fi*, x,' , x •peration Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 1 End Date:3/26/2013 X3-01 OHM-C:DRILL(4,013,020.63) L Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 3/20/2013 00:00 - 04:00 4.00 CASING P RUNPRD CIRC BOTTOMS UP @ 3 BBL/PM,550 PSI, MUD RETURNS @ BOTTOMS WAS DE-HYDRATED,LOST 7 BBLS OF MUD OVER SHAKERS,MUD WT IN 8.6+,MUD WT OUT 8.7+,INCREASE PUMP RATE TO 5 BBUPM AND CIRC 2 BOTTOMS UP,892 PSI,MUD WT IN 8.6,MUD WT OUT 8.6+:PUMP TOTAL OF 8000 STKS 04:00 - 07:30 3.50 CASING 1 P RUNPRD PJSM WITH CEMENTERS TO CEMENT 4.5 PRODUCTION CASING. PUMP SCHEDULE: MUDPUSH II-25.0 BBLS,11.00 PPG @ 5 BPM TAIL SLURRY-68.1 BBLS,15.80 PPG @ 5 BPM,326 SX CLASS G,YIELD 1.17 CE. PERF PILL-70 BBLS,8.60 PPG @ 5 BPM MUD-66.5 BBLS,8.60 PPG @ 5 BPM LATCH UP @ 92 BBLS,TTL PUMP 135.5 BBLS- DID NOT BUMP PLUG.CONFIRM WITH TOWN TO PUMP ADDITIONAL 1 BBL-DID NOT BUMP PLUG.PUMPED 136.5 BBLS TOTAL. 07:30 - 09:00 1.50 CASING P RUNPRD ATTEMPT TO MECHANICALLY RELEASE I FROM HANGER:S/O 100 KLBS,P/U 200 KLBS, S/O 100 KLBS,P/U 130 KLBS,ROTATE 2 'TURNS LEFT,S/O 100 KLBS,P/U 130 KLBS REPEAT 2 TIMES,ROTATE 1 TURN LEFT,S/O 100 KLBS,P/U 150 KLBS REPEAT 5 TIMES, RELEASE TORQUE 1 TURN RIGHT,P/U 170 KLBS,S/0 100 KLBS,P/U 160 KLBS,S/0 120 KLBS,ROTATE 3 TURNS LEFT,S/0 90 KLBS, P/U 150 KLBS REPEAT 6 TIMES,RELEASE TORQUE 1 TURN RIGHT,S/O 90 KLBS,P/U 150 KLBS REPEAT 5 TIMES,RELEASE TORQUE 4 TURNS RIGHT(RELEASED ALL TORQUE),P/U 180 KLBS,S/O 130 KLBS,ROTATE 5 TURNS LEFT,S/0 100 KLBS,P/U 130 KLBS REPEAT 7 '' TIMES,RELEASE TORQUE 7 TURNS RIGHT, P/U TO EXPOSE DOGS,S/0 TO SET PACKER, ROTATE @ 15 RPM,5/0 TO CONFIRM, PRESSURE UP TO 500 PSI AND P/U OUT OF _RUNNING TOOL 09:00 - 10:00 1.00 CASING P RUNPRD STAGE PUMPS TO 10 BPM CIRCULATING OUT CEMENT.ICP 1830 PSI,FCP 1335 PSI.TAKE CEMENT RETURNS TO TRUCK _ 10:00 - 11:00 1.00 CASING P RUNPRD BLOW DOWN CEMENT HEAD AND SINGLE. UD TO SHED.BLOW DOWN CEMENT LINE _ AND MANIFOLD. 11:00 - 11:30 0.50 CASING P RUNPRD M/U TOP DRIVE AND CIRCULATE BOTTOMS UP.TOTAL 2466 STKS. ` 11:30 - 16:30 5.00 1 CASING r P RUNPRD TOH WITH LINER HANGER ASSEMBLY FROM 8777,P/U=150,5/0=140K 16:30 - 17:30 1.00 CASING P RUNPRD INSPECT BAKER RUNING TOOL&UD SAME, PIECES MISSING FROM TOOL 17:30 - 18:00 0.50 CASING P RUNPRD CLEAR AND CLEAN RIG FLOOR. 18:00 - 18:30 0.50 CASING P RUNPRD SERVICE RIG AND TOP DRIVE 18:30 - 19:00 0.50 CASING N DPRB 11,740.00 RUNPRD W/O DOYON CASING CREW,OD,ID&STRAP ALL BHA EQUIPMENT I 19:00 - 19:30 0.50 CASING N DPRB 11,740.00 RUNPRD RIG UP CASING CREW AND READY TO RUN 2 7/8 PAC TUBING FOR CLEAN OUT RUN Printed 4/9/2013 10:26:18AM Page North America-ALASKA-BP 4 Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date:3/26/2013 X3-01 OHM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No..PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 CASING N DPRB 11,740.00 RUNPRD WAIT ON 9 DRILL COLLARS AND MILL TO RUN IN HOLE FOR CLEAN OUT,UNLOAD DC AND LOAD UP IN PIPE SHED 3/21/2013 00:00 - 02:00 2.00 CASING N DPRB 11,740.00 RUNPRD CLEAR AND CLEAN FLOOR,PICKUP BAKER CLEAN OUT BHA WITH MILL 02:00 - 07:30 5.50 CASING N DPRB 11,740.00 RUNPRD P/U AND TIH W/PAC TUBING AND CLEAN OUT BHA.FILL PIPE 07:30 - 14:00 6.50 CASING N DPRB 11,740.00 RUNPRD M/U X-OVER SUB AND TIH WITH 4"DP F/2834 MD TO 8860 MD,FILL PIPE 14:00 - 14:30 0.50 CASING N DPRB 11,740.00 RUNPRD WORK THROUGH LINER TOP 8860MD TO 8870MD,FIRST GO NO PUMPS OR ROTARY, SECOND GO WITH ROTARY ONLY a)20 RPM, 2.5K TO/NO WOB,P/U=145K,ROTIWT=142K, S/0=135K,PUMP RATES=2BPM @ 630 PSI,2.8 BPM @ 900 PSI, 14:30 - 16:30 2.00 CASING N DPRB 11,740.00 RUNPRD TIH F/8870 TO 10898MD,P/U=167K,S/0=146K, 90 FPM 16:30 - 17:00 0.50 CASING N DPRB 11,740.00 RUNPRD 10898 MD FILL PIPE,MONITOR WELL 17:00 - 18:30 1.50 CASING N DPRB 11,740.00 RUNPRD TIH F/10898 TO 11300 MD,P/U=167K, S/0=146K,90 FPM 18:30 - 19:30 1.00 CASING N DPRB 11,740.00 RUNPRD WASH F/11300 TO 11646,2BPM @ 860 PSI, P/U=169K,S/0=146K,(TAG PLUG(t)11646,5 FT 1 -HIGH) 19:30 - 21:30 2.00 CASING N DPRB 11,740.00 RUNPRD REAM F/11646 TO 11647.5 MD,2BPM CO 1200 PSI,P/U=169K,S/0=146K 21:30 - 23:30 2.00 CASING N DPRB 11,740.00 RUNPRD CIRC HOLE 5X THE LINER CAP,PUMP 46 BBLS PERF-PILL/455 STKS,20 BBLS DRY-JOB/200 STKS,CHASE WITH 69 BBLS/683 STKS OF POWER-PRO MUD,RATE 2.8 BPM@1346,P/U=176K,S/0=146K 23:30 - 00:00 0.50 CASING N DPRB 11,740.00 RUNPRD MONITOR WELL,TOH F/11647 TO 10613 MD 6OFPM,P/U=176K,S/0=146K 3/22/2013 00:00 - 02:00 2.00 CASING N DPRB 11,740.00 RUNPRD TOH FROM 10613'MD TO 8864'MD.PU=155 KLBS,SO=135 KLBS.MONITOR WELL VIA TT. 02:00 - 04:00 2.00 CASING N DPRB 11,740.00 RUNPRD PJSM,DISPLACE 7"X 2-7/8"TO 8.5 PPG SEA WATER(g12.8 BPM/114 GPM,1187 PSI,TOTAL STROKES=1100.DROP BALL AND ROD TO OPEN CIRC SUB.CIRCULATE @ 2.8 BPM/114 GPM TO SEAT,SHEAR @ 3100 PSI.INCREASE REATE TO 8 BPM/335 GPM,2680 PSI. DISPLACE REMAINING 7"X 2-7/8"AND 7"X 4", TOTAL STROKES=2168 AND TOTAL DISPLACEMENT=3268 STROKES. 04:00 - 07:00 3.00 CASING P 11,740.00 RUNPRD MONITOR WELL FOR 10 MINS-STATIC.RACK BACK STAND#64 TO STAY ABOVE TOP OF LINER FOR CUT AND SLIP.PJSM FOR SLIP AND CUT.CUT 76'OF DRILLING LINE. - REMOVE BLOCK HANGING LINES. 07:00 - 07:30 0.50 CASING P 11,740.00 RUNPRD RIG SERVICE ON TDS-11,ST-80C,ST-80 AND DRAVWVORKS. 07:30 - 09:30 2.00 CASING N DPRB 11,740.00 RUNPRD TOH FROM 8810'MD TO 7292'MD.PU=124 KLBS,SO=119 KLBS.MONITOR WELL VIA U. Printed 4/9/2013 10:26:18AM North Amen- LAS> age 5 al Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date:3/26/2013 X3-010HM-C:DRILL(4,013,020.63) - —- - - Project:Prudhoe Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time.6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 11:30 2.00 CASING N DPRB 11,740.00 RUNPRD PJSM FOR CASING TEST.LINEUP PURGE MUD,KILL AND CHOKE LINES.TEST CASING 250 PSI LOW FOR 5 MIN,3500 PSI HIGH FOR 30 MIN.8 STROKES TO 250 PSI,54 STROKES TO 3700 PSI.BLEED TO TT FOR CASING TEST VOLUME DISPLACEMENT.5.4 BBLS BLED BACK TO TT.VERIFY 0 PSI ON ALL GAUGES AND BLEEDERS OPEN PRIOR TO OPENING RAMS.BLOW DOWN CHOKE,KILL,TDS-11 AND MUD LINES.RIG DOWN TEST EQUIPMENT. 11:30 - 14:00 2.50 CASING N DPRB 11,740.00 I RUNPRD TOH FROM 7292'MD TO 2833'MD.PU=109 KLBS,SO 108 KLBS 14:00 - 18:30 4.50 CASING N DPRB 11,740.00 RUNPRD 'MONITOR WELL,RIG UP TO LAY DN PAC PIPE.TOH FROM 2833'MD TO 288'MD LAY DOWN 2-7/8".PU=63 KLBS,SO 62 KLBS.TOH BHA FROM 288'MD TO SURFACE. 18:30 - 20:00 1.50 CASING , N DPRB 11,740.00 RUNPRD CLEAR AND CLEAN RIG FLOOR.PREP RIG FLOOR AND PIPE SHED TO PU PERF GUNS. 20:00 - 20:30 0.50 CASING P RUNPRD PJSM,PU PERF GUN ASSEMBLY.RIH 75'MD OF PERF GUN ASSEMBLY. 20:30 - 21:30 1.00 CASING N SFAL 11,740.00 RUNPRD FLARED OUT GUN X 2-7/8"XO CONNECTION AND PAC-PIPE JOINT#1. -CHANGED OUT GUN X 2-7/8"XO AND JOINT W/JOINT#65. 21:30 - 22:00 0.50 CASING P RUNPRD PU 2-7/8"PAC PIPE AND RIH FROM 75'MD TO 483'MD. PU=40 KLBS,SO=40 KLBS 22:00 - 22:30 0.50 CASING N j SFAL 11,740.00 RUNPRD FLARED OUT PAC-PIPE JOINT CONNECTIONS ION JOINT#11,12,AND 13. BREAK OUT AND LAY DOWN FLARED JOINTS. REPLACE FLARED JOINTS WITH JOINT#62, 63,AND 64. 22:30 - 23:00 0.50 CASING P RUNPRD IPU AND RIH WITH PAC-PIPE AS PER I RUNNING ORDER FROM 483'MD TO 578'MD. PU=42 KLBS,SO=42 KLBS 23:00 - 00:00 1.00 CASING P RUNPRD PU AND RIH WITH PAC-PIPE AS PER RUNNING ORDER FROM 578'MD TO 1263'MD. PU=50 KLBS,SO=50 KLBS 3/23/2013 00:00 - 01:00 1.00 PERFOB P OTHCMP RIG SERVICE,WITH MAN DOWN DRILL. 01:00 - 03:00 2.00 PERFOB N RREP 11,740.00 OTHCMP RIG DOWN DUE TO PIPE ELEVATORS WOULD NOT OPEN OR CLOSE. 03:00 - 06:30 3.50 PERFOB P I OTHCMP CONTINUE PICK UP PERF GUNS AND 2 7/8 PAC TUBING.Ca 2447'MD.PU=65 KLBS,SO= 65 KLBS.MONITOR WELL WITH TRIP TANK. 06:30 - 07:00 0.50 PERFOB N DFAL 11,740.00 OTHCMP UD JT#43 2 7/8 PAC P/U JT#59 TO REPLACE FLARED BOX.@ 2857'MD PU=67 KLBS,SO= 67 KLBS. 07:00 - 13:30 6.50 PERFOB P OTHCMP PJSM,TIH W/4"HT-38 14#DP FROM 2857'MD TO 8834'MD.PU=144 KLBS,SO=136 KLBS. SLOW ROP THROUGH TOP OF LINER @ 8865' MD.CONTINUE TIH TO 11585'MD W/4"HT-38 14#DP.PU=159 KLBS,SO 149 KLBS. Printed 4/9/2013 10:26:18AM North America-ALASKA-BP ' Page 6 of 8 a Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date:3/26/2013 (X3-010HM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:6/18/1980 12:00:00AM Rig Release:3/26/2013 Rig Contractor.PARKER DRILLING CO. UWI: Active datum:02-158 ACTUAL @78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 15:00 1.50 PERFOB P OTHCMP TIH AT 70 FPM W/4"HT-38 14#DP FROM 11585'MD TO TAG UP AT 11647'MD.SET DOWN 2 KLBS ON BOTTOM.PU TO BREAK OVER @ 172 KLBS 3',PJSM,FIRE PERF GUNS AS PER SLB REP.2X SETS GUN FIRED.OPEN ANNULAR TO MONITOR WELL. 15:00 - 15:30 0.50 PERFOB P OTHCMP TOOH FROM 11647'MD TO 10068'MD.PU= 172 KLBS,SO=160 KLBS. 15:30 - 17:00 1.50 PERFOB P OTHCMP 10058'MD CIRCULATE 1.5X BOTTOMS UP, 59 SPM Cl 250 GPM,1140 PSI.PU=172 KLBS, SO=160 KLBS. 17:00 - 17:30 0.50 PERFOB P OTHCMP FROM 10068'MD TO 8929'MD RACK BACK 12 STANDS.60 TOTAL RACKED BACK IN DERRICK.PU=170 KLBS,SO=158 KLBS. 17:30 - 18:00 0.50 PERFOB P OTHCMP SERVICE RIG BX ELEVATORS. 18:00 - 00:00 6.00 PERFOB P ( OTHCMP FROM 8929'MD TO 4753'MD,LD 4"DP SIDEWAYS.PU=160 KLBS,SO=150 KLBS. 3/24/2013 00:00 - 03:00 3.00 PERFOB P OTHCMP LAY DOWN 4"DP,MONITOR WELL 03:00 - 03:30 0.50 PERFOB P OTHCMP CHANGE OUT PS-21 FOR MASTER BUSHING, PJSM TO LAY DN PAC TUBING 03:30 - 04:30 1.00 PERFOB P OTHCMP LAY/DN PAC TUBING. 04:30 - 05:00 0.50 PERFOB P OTHCMP "WELL CONTROL DRILL WITH NON-SHEAR ABLE ACROSS BOP STACK 05:00 - 06:00 1.00 PERFOB P OTHCMP LAY/DN PAC TUBING. 06:00 - 08:30 2.50 PERFOB P OTHCMP PJSM,TOH FROM 1631'MD TO 579'MD WITH PERF GUNS.LD TO PIPESHED.PU=40 KLBS, SO=40 KLBS 08:30 - 10:00 1.50 PERFOB P OTHCMP TOH FROM 579'MD TO 107'MD WITH 2-7/8" PAC 10.4#DP LD SINGLES TO PIPESHED.TOH FROM 107'MD TO SURFACE WITH PERF GUN, LD TO PIPESHED 10:00 - 11:00 1.00 PERFOB P OTHCMP RD AND LD PERF HANDLING EQUIPMENT, CLEAR AND CLEAN RIG FLOOR IN PREP FOR COMPLETION RUN.DRAIN STACK 11:00 - 12:00 1.00 RUNCOM P RUNCMP PULL WEAR RING,PU AND RU 4-1/2" COMPLETION RUNNING EQUIPMENT.MU LANDING JOINT AND XO'S TO HANGER IN PREP FOR DUMMY RUN 12:00 - 12:30 0.50 RUNCOM P RUNCMP I PERFORM DUMMY RUN WITH HANGER ASSEMBLY LD SAME 12:30 - 13:00 0.50 RUNCOM P RUNCMP M/U SHEAR SAFETY JOINT PRIOR TO RUNNING LINER. 13:00 - 13:30 0.50 RUNCOM P RUNCMP RIG TO RUN WITH 12.6#4.5 VAM-TOP LINER COMPLETION ASSEMBLY 13:30 - 14:30 1.00 RUNCOM P RUNCMP PJSM,M/U SHOE TRACK ASSY,F/S-200, BAKER LOCK ALL CONNECTIONS BELOW PACKER.P/U=40K,5/0=40K 14:30 - 00:00 9.50 RUNCOM P RUNCMP RIH F/200 TO 8705,W/4.5 12.6#VAM TOP LINER ASSY.AS PER TALLY,AVG TORO 4440, PIU=129,S/0=122 3/25/2013 00:00 - 02:00 2.00 RUNCOM P RUNCMP M/U LANDING JOINT,LAND TUBING IN WELL HEAD. 02:00 - 04:00 2.00 RUNCOM P RUNCMP RN REVERSE OUT LINE AND DISPLACE 120 DEG SEA WATER 296 BBLS TOTAL 04:00 - 05:00 1.00 RUNCOM P RUNCMP INSTALL LANDING AND DROP BALL AND ROD, REMOVE LANDING JOINT Printed 4/9/2013 10:26:18AM North America-ALASKA-BP Page 7 of 8 Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date 3/26/2013 X3-010HM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud DateTme:6/18/1980 12:00:OOAM Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL @78.35usft(above Mean Sea Level) Date From-To j Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 07:30 2.50 ' RUNCOM P RUNCMP PJSM,TEST TUBING 250 PSI LOW 5 MINS, 3500 PSI HIGH 30 MINS.VERIFY TEST VOLUME RETURN OF 2 BBLS.SET PACKER AND TEST 250 PSI LOW 5 MINS,3500 PSI HIGH 30 MIN.VERIFY TEST VOLUME RETURN OF 3 BBLS. 07:30 - 08:30 1.00 RUNCOM P RUNCMP UD LANDING JOINT AND XO'S.B/D SECONDARY CIRCULATION LINE. 08:30 - 09:30 1.00 RUNCOM P RUNCMP PJSM,PRESSURE TUBING TO 2000 PSI, ANNULUS TO 3500 PSI.BLEED OFF TUBING TO SHEAR DCR VALVE.OBSERVED SHEAR AT 3100 PSI.CIRCULATE DOWN TUBING TAKING RETURNS TO IA775 PSI @ 1 BPM,42GPM, 1365 PSI(412 BPM,84 GPM,2378 PSI©3 BPM,126 GPM. 09:30 - 12:00 2.50 RUNCOM P RUNCMP B/D LINES,DRAIN STACK RIH WITH CAMERON DRY ROD TO INSTALL TWC.FILL LINES AND PRESSURE TEST TWC FROM ABOVE 250 PSI LOW 5 MINS,BLOW 3500 PSI HIGH 5 MINS.PRESSURE TEST TWC FROM BELOW 250 PSI LOW 5 MINS,3500 PSI HIGH 30 MINS.GOOD TEST. 12:00 - 14:00 2.00 RUNCOM P RUNCMP B/D AND R/D ALL CIRUCLATION LINES,B/D ALL SURFACE LINES,DRAIN STACK PRIOR TO NIPPLE DOWN. 14:00 - 22:00 8.00 RUNCOM P RUNCMP NIPPLE DN BOP STACK AND RISER/SIMOPS, LAY DN PIPE OFF LINE 22:00 - 00:00 i 2.00 RUNCOM P RUNCMP NIPPLE UP TREE ADAPTOR SPOOL,TREE VALVES AND TEST ADAPTER. 3/26/2013 00:00 - 02:30 2.50 RUNCOM P RUNCMP RIG UP TEST EQUIPMENT,SIMOPS,L/D 4"DP OFFLINE,STAGE RIG MATS,STORE IDL IN RIG MOVE POSITION,ATTEMPT TO TEST TREE 02:30 - 04:30 • 2.00 RUNCOM P RUNCMP R/U ENTERPAC PUMP TO TEST TREE TO 3500 PSI 10 MIN,SIMOPS BLOW DN INTERCONNECT LINES AND DISCONNECT 04:30 - 06:30 2.00 I RUNCOM P • RUNCMP 'R/U LUBRICATOR AND TEST WITH DSM TEST PUMP,PULL TWC WITH DSM 06:30 - 09:00 2.50 RUNCOM P RUNCMP M/U SURFACE LINES TO FREESE PROTECT WELL,TEST SURFACE LINES _ 09:00 - 10:30 1.50 RUNCOM P RUNCMP PUMP 79 BBLS OF HEATED DIESEL DOWN IA TAKING SEA WATER RETURNS THROUGH TUBING TO CUTTINGS BOX,1400 PSI 2/BPM 10:30 - 11:30 1.00 RUNCOM P RUNCMP ALLOW WELL TO U-TUBE FOR 1 HR,INTIAL PSI 400 FINAL PSI 0,SIMOPS:CONT TO RIG DN FLOOR AND INTERCONNECT LINES. 11:30 - 13:00 1.50 RUNCOM P RUNCMP SHUT IN IA AND DISCONNECT FREEZE PROTECT LINES, RIG UP DSM LUBRICATOR AND TEST.400PSI LOW 5-MIN,3500 PSI HIGH 5-MIN 13:00 - 13:30 0.50 RUNCOM P RUNCMP INSTALL BPV 13:30 - 15:00 1.50 RUNCOM P RUNCMP R/U FREEZE PROTECT PUMP AND TEST FROM BELOW 250 LOW/5 MIN,3500 HIGH/30 MIN 15:00 - 17:30 2.50 RUNCOM P RUNCMP R/D&B/D ALL CIRC LINES,INSTALL PRESSURE MANIFOLDS ON O.A,I.A,TOP OF TREE,CLEAN AND SECURE WELL HOUSE AND BOP DECK Printed 4/9/2013 10:26.18AM North America-ALASKA-BP Page 6 of 81 Operation Summary Report Common Well Name:02-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/18/2013 End Date:3/26/2013 X3-010HM-C:DRILL(4,013,020.63) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 I Spud Date/Time:6/18/1980 12:00:00AM I Rig Release:3/26/2013 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:02-15B ACTUAL©78.35usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:30 1.00 RUNCOM P RUNCMP PREFORM MAST LOWERING INSPECTION 18:30 - 22:00 3.50 RUNCOM P RUNCMP PREPARE RIG FLOOR FOR SKIDDING IN AND LOWERING MAST 22:00 - 00:00 2.00 RUNCOM P RUNCMP SKID IN RIG FLOOR AND LAY DOWN MAST. (PARKER RIG 273 RELEASED FROM 02-15B 23:59,3/26/2013) -ALL TREE AND WELLHEAD VALVES CLOSED TO PRESSURE GAUGES -FINAL T/I/O=0/0/0 PSI -TREE WELLHEAD AND CELLAR AREA CLEAN Printed 4/9/2013 10:26:18AM 0 0 IC0ppOO gP" mm2'q MER'2 OOE, EOV?N 04Ei E mil pHAF 'N '22" g324 Veys; ,12*§ mamx� mmmw 20A88 Va8' &taOg c S 11111aNNaNNN2NNe dN NNMtCMd vavov.-ava4a'-44 "444 ° $agogamm <meaaa. "4 44 " 4 " � r r n cN .3 N "VP 0m Nmd HMI mN gF m Q32Nm m 0 0' O m N888228L's8m3m2mmmm m2,, Smom O 800+ w 28222 22282O OnOOO OO2N2 OOOOO pONO OOOOO ONTO^ cJ N NryNN NNN 0NN N NN M.-4C.4- NNN NNNNN NNNN p 88888 48828 48200 884 04 44888 84488 28888 80088 14484N N e4222Aoo e3222 ?22,72 22122 m6-NO2 MNANA 800Vn MOOWO 82n 7 O (`') {{pp r�pg[p y�y d yn'� m M�yI ^^ ^1E1� FHA§ MEA Y1CyY n� Ym11t°(IN^ �blO�tO N nim CO�m Nm N NNNN N M1 hrtni IAN m NNN hn hn O W m EMI m n h� Iry A n r- m A mA m m A n n I� m nm t nO n n mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm fptmni m�mmm mmmmm a^am 7az 22222 226122 2r---24g 22232 2232 -'2202,2 o-'2202-'2202,2 L2o,31d 22,2F1 2,O2F1 rn=,m�. 2 N lYCOOOs 0a dChO O MIK' whr0 nOOOOOOOnO ZYam22 °agQ222282 2m222 22228 22288 m8828 82222 22 m0( mtum ( 2m m mmmmm Nmmmmnrm 2222 y Q O HE!! N m G C O O m 0 0 0 0 C OOCO m a A n NNN C. CD Cpp tVV "00099 2,,2222 92 .499202 Onh ON 022'22P-' 322p.to Cp 7mNI7�,n N 7h ISN 2mrP.Y Ci Wl0.099 T-N, 1-9900 q-.-e-N, riMev6 .y.w. .mm.--ur rr NruNAoi N NM nt4 CID EE f — _ ' 9m O 0000 847,818V 4/;;48 /;<NO 8;:.328 oC .A mn 8 V dam ;:8828 NdN8N N28 opc00 "99.- 999Rp 0'.0 v2 0 6rHMe0 mRF,P2 ?nng$ m /�CD= Q m SII m o p in N 0 I m Z m N MmN7Nw 22C:=22 M MCm Omry dmn ppw NA M p rM2Nmu2i.N- 0 0 re E. 2-"'222.'22 2rn20AI NN C C�Nr CO22 C2 2 222022 3 N m mN `,22N°I°Of N N 0 0 S S E 1 000GG w w w NN ��w�w 1�� NC)d m '.9. -!= 428 CMYCI 028 782(4°8 9 U~G 8 m m c ° w N m E F r.r° m8 "2. U E• g 0 Mmm$np .Ur ,p m N m cmioc 8228 mum,:083 o O 0000 0 w 22222 8mm02N 0p 0 .°22,827: r bCN•I 0 ��aINDAm 0 FNmmo M m.O m i .12g22 E .7�OOOCC ,w,,N MS/000 0: m maw 'wrvNNmg84, mMmnA u'Om ON20n2'MO 9 tr I . O Q _`o r cg ffig i ._r w` I"e SolVi+ U O 0 V C f y LL.4 C ° 2 a O L,;-- —g •E 0 0 0°m A8';-.816• 82842 8 9---- 8826-2 N m N 0 ¶N 0 K n n n N O I 0 O C A N mM 0 n 2/I m t i�' P 042'0 050.• > ;- 6 m q% i 000CG . --NN --ooq R-- r—/—, ¶-0// 4TriOm c".Noi.m.2e '4,92mm m o m 3 2 9 s z° S `o ° v a mm m 0 0 v ' u zzu4 $ 0 m d jX0mu , nv AMnn D ,ngnQNN 2.:".E.7-82 nNOt6d 808 t F ,vN, vv, 00.1-,rC C00.* ,,,v..-.- dd . d0m 0m0$p2 ', Ior maO. ,i� w 8N NNNNN NNO^f 2212CMdyA NW in N Ip Imoom22 22222 22'I2222 22222 g6;r,IIm 2commmm gmnrGR 20222 223222 O > 81888 1.48888 28882 MwVM�',.snE P8882 Ansn rannlrI.im"ip c'riA82Id' W'AA00I oNNNN MM O J!,.. ... ..,=z2 8 O n o 2 C 8 8 8 a qA282 Nw 208 d ;888'.= 2O8 8 8 8 d d.n 271:E Nm M Fir,-, �< I7p lnC0m ON , NNN ^m ""2 r[yn. . 7t'','F NNN NNmNN NNNNNON:'E N m m r m - pp o �a w :,-22 8 +i.,m • 0p 3 ..-.A .mg N m 0 TO000 o 28824 24A8:1 28282 p n NN 8:=82A NCand 28387 ,73,42fjM°i cCtmPi" - GGGGmor2. m0�O0 ommom GG-,w Nn.. 2220 - 7Nfjmv o $m 0 2 ';::,,i1;'72.33"- $MI -g" _ a nma8; gaa°a000gsjcmniZZZFo 22'2222 2 ncn"P 222222 22222 2222°2 22222 822222 22222 22222 � G'.1drd dd iin a<Lvv vdda< "1 . .:44.44 "2701 AV" E �N nOr�nmA mm o.-w ----- mwN, 2g,n� 88242 ttVV ./ pp♦yd S .- NN NN N NN M tI CIOMMM CI Nt2M3 � o w o to 0 @▪ a c w . .0- 8,.. N iil Q . cZ `g ok.—z . mtQ 27 $ jo;^ 791 O : aza13n E m c zur• _mtmiffllsg P2 m 0 1q anmmm dyi" 2"'�i 4412E Ap�F;2Vip ppm"r2Ei "'orVN ynye�1aooa`" p 8ov Nn`�i��: foN iti qp1SS♦N PP N v r r� m N pb t'ISn<N O1 d n 4 Of��NED �G O pA Np 1700 O�2m 4 1�m0 NO N.-S�O �pnN�t7 Nm t7nm ta0�d m� Y S-OW 0p0p0 p pNp taq')a n lO pmp.AO TN 1yy7�14 NlD N g§�18 m AS7A Ymr 2 e7d ' Q.7 Cf O/ mea m p N 4 4$ m N 2 0 Q m m Q m 4 7 rp 0 m Y i617-5g 43:71‘13 t V p N th l7 (m7 m0 a�0 m Nm FAMI, 0m mma�<a V O Q V Y amC ro�m OOWmm�� Ft o mmm v a a a Epmm ppEp a s e e e a 4 a d 4 eap 4 4 4 4 444744 4 0 4 4 4 44444 44444 44444 44444 44444 44444 44444 44444 44444 4 4 4 4 4 4 d 4.0 A no�goP! 2E=-24; r=N ; A N m M7N mom<SO Vv ZO RO M Fv TNNn A N0 A WA m Sm 00 62nmmOAmn ohao § 41 gSymSSo^5PPE mmmm �� gi NNNr NNNN N N000 oon NA NN NNNNNANmNmN NNNNNNNmN EmNNNN12A0 N 002h9OGOO2 GOOD^ GOo OOG ?FTM GnOGO NaNtO+- cc-°1 008 .S8"g 00842 Oonmr 42248 48222 Sieorn eNOn "AAm n���� oo82� m4� �m 9ONmO 0 _ ao� ^N N A r OCT m mg � Or C m 0 tV G o O�A r .- PEER ")Oi n h »X " n �Yo�1E44Z2JE1N E ��0 g aH m`(g$ PFRF EFFI� mm f0 caVN p�Elg NE.� Nmnlo V 1�"8n1 mv1rn W./ a C1 C) M C1 ETi n N NN � 00000 Op.em 0>O.m 2m m0 m m� h A �1G tp �'��' � nn�n `r A n m�' fff0000 lO fp 1100 1p w nn m nrn m Mil mp it m 12p12p mmm mm mil it mmm2 mEEE EMU 1$ mmm�lm mlo m.o mmm to f$f$ m m 888(8 1$ mm m em Mil Nm 2888 mml°D1mm mm C^ r V S 0 m r•1088'42 88888 888y 88gN N.2,24m 88228 AN m48 44%" O�S mN "2" cpp�� O Np "288 NmD 4 smq2o � '- oRE pg FaHi m2 . .28mmB § Em11mrn§ Y2o2ogs2mm218Nmmg 2NN2 . N NNNNN 222.F. NNNNN NNNN Nm2NNN..N Nm N22NN O p it p0 S tV1p {p a m N 0i N m e N N O V N N a ETM M ice' 17 V N N u 1 b N N O 1 N S 8 O C 1 m O t N N m O m N O M I r.4D O N ��'-� m 7 N NOO Ci< ��.�C Coe-CG No OC CCGOO G ,%2 827.82mO N g O 84 A82 4 "282 N 2iYN 228" OOWHN 88882 m"m m0 ObNOO O'NO "462 "42 oo " O1'O'"11" 8882 (n7agmm a.Rgn3 1F1107EAT7 ga4q< Sp21.N4gEggA $ mo1�+n"�rn Am$';'m 80m m72m2 d[8.4888672 A42122 7A284 Otdd Tp 4 SN 2 2',202N 7Nd pr m m0S 0 O THann421'7'28 8"n2102"2" 82 822" 82288 80 . "NN 88;4 88 "gnn "22 e . N O m 3= mmmm� 12,5.-B(v mvg mx218n ""4 "4 4.844.8 ;8882 v8r20.4 82,48 nE8 88122"m 2"2g 887-'-88m22So r< wA NNNw NNNNN PEG ERM !ONNN nSSvm HRH; vmn Ling N V (n O N y pa O i.x^..� 8 gmm NmAAO 224" 8826-8 848,44 VA• -ER 22482 8421442 cA+11D 82'..; 888822 : 8:5;18' `2,:t"8 4(0748: V1 2 FFM .- ne! ��$NN EEEEN Hv141nfN7 E rrin n7>41, [-;?;:in "Ni1XHR Nc.HE m$(rarti ��mmm mmwmc 0 S2 288.24^228 "82 8244228222 YON CS 88248 8,1882 4'2882 Om22g 1�280,id 2OQm ,I,c4. 4 2 N'^ viR m2� nn17n EE U ono. N m rii o a'-2N Vim^ rErpp HRH 7 L222.2- Oe-N Cl C1 Y h� 20 NN MFA EEM VV uu11(n7 a 0Q4 NMN N 180 22 88882 N 01 N N N 17 1�17 M t 7 �� a 4 Q 4�N N N M2i m m 10 N 1 o I�M1 r A r 1: 02 {2fppp2mn magma Qnmm rycpQpi ry 1�pm n... MgGErpp'NCV MYcDlNr'� ve nemTr' eme2nn`8124 2%.,22? eWlm12v12p (v�c;74 aa, p ~ 801`184 ON"Oin W N alA0N4 M(p0208 Nnm4 MIT n01AY171D Hilt Hill om CEf)r N �-Om� nN 1e`lilnlo°ifn LUNA k°i E�,E`�inn nnMo< M<0 WM 44«4 "Hi l4a Q4444 44444 o4aa av�a4 vg?vO, 28m4�0o 221N7ip2n mm1d�18 °innti2 appl8oar°.1 ""�11 mn 8`82" 1p8.72"�� 428" 44842 842" 48288`2 0 SN18p5O N 4 N O1 O� "2i iid ECM O.5000 o4n100m @4428 Mit PAWS<v ±V Y ii l Mil tA0 t n l0�n A�S�Sn 'r'31�r,1°•3`8 Min 1717NM1gS 174447 74444 4a 4744 7 a 44444 4 474 mm A yy O C1 N N OSE,M32 mc NN frv'1t077 S8',49,42 NEED N 02 MPS 6f0 O42, 4S4i(120"I02"21 �..� <Cl r N.-7 01 Smn <h N S �000 A 40 m E AN NN NN N NNN N N aNN N mEoN tHERE HERE Em m$ N N mN N EEEEE N NNN N N NN A RENEE N N.p1(010 074,-am"21 1V 4 Hob • ONm tA7P ry f4GS7 a rAP9C70N 8.4208 8%Gr2n W hmN 02 ,c754 7 7.1444,'= ' ENP NNNNN N0NN mNNNN N .NN NgNoC TIP/AAA n7n0p 04444 74444 44 444 44444 4 vz 88882 88828 88828 88888 88888 888a88 88888 88888 28888 A8888 88222 88888 88882 8 man,$�$: 7%3271 AIgrI � 3mm7127f$ $. ggg 71AS27 n4mm7A sm-4am snam �421me� nmm71.°•i azoeg m'ogS ETiehi"l�i"E�A ni71h2nAn .7nt';A`Y, 1RCf0nn 7444 e'vaa4 44444 4 4444 44 47444 a 422N f0 N _U 8 C O) E C E 0 U, 4JSOCf:..meh rNaN2ammav- ""P' SSrONONT 020 1.-2NNPf V-PMT0v o H2 :138P2 f EFO1" O�° " ^mt�m Wb$m �ppERp{�ep� �ppPERE E]CE '1'--R22 rm$-oob$NN$<$ mr 7 mWNm tryppOh , E 2,7NO o^8O �bM r 'TM P< 0aQ 2.4P4 .1.§ rTaWi ggaT ci 'laeomascarasaveva Dewaoeamovarvvvaaara88888araavvvare raara< baa a $iW n m W N M mbNmN O e PO aV $ < N Cl a'�bP O¢bAm N W b M1mgn „-^<P C]m0 •.• $1p ry e "bin M�mrr Yf � n me3N8m � m mC1N .- tp �41.8 CNJ m OO.mmar pap�ana OOOH� spfAsEG�a. (�l t+f N.OM �n[7N WN rTT7,0 00000 pOH OW)m p 2PpVVV'p�Im p^p aPOP mPmmtO, .c.O N am°mT molm.NOamNO .tummy .mmmm rmmmm . mm N�N1�ND amD ::: ir: m a°a0m N N H m m m N N NNNNa� NN N�!NN N NNNN N f.(NNN N N N N N cy NN NOOON NNt.{N tY NNN N N 0 0 0 0 0 r 0 0 0 n 0^O O C 0 2 0 0 0 A A^0 0 0 2^0 0 O O n O n 2 0 0 0 O A n r P A 00^0^ A00 0 OA N 0 0 0 WAaa8 i , ne" mA ooAWXP $$S?-8 Nm22te a,PR2o 2no. $ePi2 om$mX 8222" n�$,on rom�O'.Ca�J a0 V �Oi lhNr hA Na0p CfAa.p 2 Oi ma� N ffppG< 0 N Oim b Vi pp b n Oiyy M ICI O t7 2mio O OI N 022 aa]CIN O W n E bEEN m2mCD P n. Nm ` 1E2DD 22D .2MS MEE 2 .... 82222 22222 2.222 .22E. .3..2 22 22E22 .8888 .2... 2282 mm2 C^b+ $mh W n Ny b m N2 N NC 'Nm8GA0 2 82 mmN OO :74728 a70O PEP Q N• ONON tOm N(0 bv1<7 s•-7btu: -2=NNN M...m 0gOTN PO maC�r 22 82,% TSAEA NOCN .22 881'8 88888aa2Aa $saaOO§ avisaasaa assay 8888838888 Pass2a888_ 02N "g2m - $.0 .NgR 22YOyW O0 - s mm2NNm2 Wb% bb2mnmb NN222 22bh mNbb bbPb N.b2. bmNb bb.. b b b m m WO^p80bm0N0X0 2040 2020 8m m0m0m0e0 Nr c mo mo ToO :1(7482:1' o N °2N O=< 8 On n OO R.Nn DOO b� 22PTm rm mn N TN:22E ne CIm CI OOoio N mm <<a0800 <00 m+4.GO22 NOIN002 O.a7P�2 a1�2N N Y 22P W $O82p Na0 V V O M E 2NP NnN NO 4822E A p a e r 2 W y1 �p aC+�I �O v� t0 Yf yapp mm m N ♦♦ eD t?mOtPO <O�A aG QppQ�� OmiO y 1�.- TO.�O. 0.0.000 0 M2ma0N N vs NNN NM a�Mm 8mM20 O e a 0< W 0.00 OW.O. ...a<O. �aD fO m.D mF gnn Cf A m NC) o0 mm _ 0 0 R A m N h N O m 2 N m. r f 7 "m" O. m M r O • .NN N . b • 1 N2Nn1 h�, V vlm ..0. r • NmM $i<NO OmmOq Nfe7 m $000 mN.OW <NWNN A22:2: 22220 OiE22 • nANaA 0 j P2 222,1< NNsa ONAOM 2 m N NNN NNN NNN O h ^'m o An N rb m N P W E2 %042Pg W mmA v nmM1 ��m22r W.a:°a� ;�n�T aoa"Wi2mm $N�;m� a�.P�N X888 a»�,m .e �2.d$� 2�m �<B:° nNa��; Up m o tOi Am taq' 0tN(aV N 2. mO .2 2 b GP 2 y P M1 Q EX.. 28000 ' NN NN O Ago,i;C ppOdvT wIwcommi ...w. N T doBT O 2rw2n 'Rm< TATRA 22A88 a?sr8n • 2�m8r .n4at- rmm$rIm22:22:1-26- mMNNrn mrrn4as? VOI < $mrno oHoo "OaP , gE2 BE:4 g eee mmNP ]m2o2H<pE m. 0M7. n,MP Rig O 2N7 EN W N 2 222228 "822 82m 2 nnmm a n ;"O "282 Y mA Mp m3 nA 22228 222" 22.7-.-82 E2 22 2 22,"2 Nlr2 22ONr 222 m mrRooSm 006 f4 WNnEa EMR NN2m .miNP HIES REM nAEoon 8 gz..."80:, 22228 22222 2882h 28882an 222=i m2=i22822 en 82"12 ryn 8< 22222 "8'42 22" 2 �<r2< 122 2F2 2;2 28 22 4- 1M lT Qfma NFRg:7mnaA E2mgHERm pmmBm a^nrmvm.11 122"8 ""2" 82"2 22"Z 2:3222 22282 --rro"oi "1"2 "228 22222 2"r2=2 2" F m opp IW W O vi 180 aopi ac Y a�iN.- o ari ci•a of <Cf n p aop MAI e c+i"in oiN aaiQ ac �°0i rim N� cOpi r ani�a�yy Y� F M1e m a a<D I O 0 e V Omf H "in !!!P fOmaNnuNi mNmtNll u� YI aM0 n h hh A I aOm mabON /RH aN mm2! k mf N um."m.N tDm iNO aD aO CI Y�Op ".2mWm PPPL-3 O mr:'NN e8m2< ."432P2 2 P2 TEr1a 2:3 8 04ReP NN��pNo< 2Nr2=n 282or PVT "'SS OO ++2<m qqWWNNNOO Nmmm 0N2NN VN E bNmN NNNNN • NNNN NNNN NNN NNNN NNNNN 3C°2828 V$mmP EP,22.° $bemm mbe wy T2W2T;< P2VT-2 $28MZ �amAP m NeNo m2<o 6-2S2! 2ri80 P «OQ 4tV.31;P< eaa00 00000 O«O 2202p dF4Ne< 222M. MCNOOee ONNNN NNNO : T-'V^ N'.7A 2e2222 22222 C2 2 22222 22222 22282 82888 88288 8822! 888 88 8aM1080N2NN8Cb 8 88!" OO 88888 8888 882,3:.= 7I law; PHy PHI m<m2b NbmO 1 111 ME' NDi .N8WV Nu N S Z 0 • 3 U 2 m N s,Nry do ANNNW NAE AW02 WEE �ERRER �aan m�Nd"A� me'-moa EPE2m U55,E REEF O � O m r m2 N e Nmd EEHE 'O Q Of Cfh mf7 � EPE2 Oi i(�lff� o WN Egg1O�y 8 "m' m m sa grpaN oSoG* ;Am 2 *fi") 2St$N`O mr ,0�. rBVI�TN �2eg m A A n ;C'1 t 7 e m A C t 0 O N N m M 0 1 1 1 d � 4:i Mca fsEEi h,tH EE ERE HERR RREi2 E8558 EE gEE 0- VVav ovaa eeV4a WV4VW vaoae eaaaa WVVTV VVVIV Wvo<a a}vea VT4VV v°Vvec O<YOv VVVVI a i uv1A p�n�� HIRE mm yy RNQQ 0 W EN N W oV p EE 1 m W mN M W ynGF M E W D ENd b EE WAEE nmE. EE ' bEbsbE2E8m0EmWA TEE !!!!! 5, O !!!!:! 2iP8Rmt MEYN NN NNNEN NNN !!!!! TNNN NN gNNNO 1NN !!!!! Nei`NNo^ ACCCC rCOOG ^^C^C OROR C ^ OnCC^ P^oCC !!!!: OOOAAmCdd200 rNWNC mm 0 NH rmNmp o0^20 ppCror- Crsm mTrmO ogm .7m{ c4a 7 mHd ri rG p02 o800^ *t<* E0022g* oOVV p**,pNNrr rr'§ O 22N 'i mAn **S4a. 2E 222EE sEE2E EEERE E2222 2EE22 EEEEE EE EEEtE HERE EEEE �N�iv7 iii22 Ei5E2 iiiE. 81• m0 pChmrR2 COON O 2ONN NOe A I iaNNg W d^drT2 ANm r**882m0 N2 ^'Nm^ 11��VV 001 EIH$ c � pa 1512 T ^WAF2m-6; Wn88 1$"gGn832 2 82 8 8 2 8 8 88 8 8 8 8m2 en< let-VMS88 8g28888x8 8Fg88 a888� o888 88880 g0888888 888 88888 88888 8 2NA F2TT2 WWoTWssEW2NWWT E8m82 EEEWE smEEm NmE$m EWmEE N8TWdN$EE 42NmYEmgm$ jgeg NrNNO 8N208 **GTE NOnNN mV*** g8TGr RmmVNS F87-my .18682 8TVOH 000 8482* O O N C r 0 0 0000 N N C)N 0 0 r r r r O e4 wi 0 8 N m r A h O 0 0)r C 0 0 0 W rap"A 0)0)0)tO OG 0 0 0)0; r ANN d C)C)0 0 0 *OV *tV e W 8p. 10 V{V OO 00 22N RNd 2 Or) m0?r2 W m22o0 T W A Or72 N28 8 �n O **TVG O mmaC) 82N<r <Od NO N070��r OC1222 O N O N rNr N Am C t A C O ";g4. pmp o�YNy)n t7 O <9 t� Iph m 'dd m N m O N d o sN Nmm Oi o ro mm {{pp )G m 0)O N d n O A n A n nA !�An^A n^aGm mg0m a mm 8mm 00000 NNNNN �q� N NNNNN �NdV�N N Nm NN N N ;r+�) r r r r re-r rrrr r r rrrr r.-rre- �r rr r NNNNN NNN N N N 2 igNT g V 28 mmW 402** V228* gm<ONOh 8T7Z m NN Nmf") 7240POWs 8OOr�m8 Amr uOry7 tmV NO�Y)O 8PX m Y 8Zi V SN YOiNUO)mA EE N N N N N NN N N E R N N N F N N n N FIE Cl CJ n um N N N N N N N NNN N N NNN n H n 5 E Z N NNN N o 8¢A A N O gW...fa a* m20007 W 1m W W o W o2O W 8 m,iN *RTAS 88 W No 841:=8T 88PPV *87-PiO N mm m m 2 W;T m W N TA N C Qm mCA NQ 5* 0 GIT V F ::r: m ::: oNpNfyGp Q.rrn n mbm� m rT!06mi OOi O)OWiOH 00000 *N (4ON�f r,mg 1A. *V !!!N rrr r r r r r r N NN N NNN NS NNNmm VV= m OO Nr!!! O'70aT TV*CIN RyWirr6 Nrrrm W 2P. A O NN r2N WOW 4 W m�, �a r�nm� e�eAT oWimpvf) o nWov�nim U7 Cf E aG nl fG tTO � d W t0 AG COOL Mil Ian G thN A e < N EWE- HUE O Ot7N N N to yy :yy:$$ �") �0 n� Wv.o dpi 280;7 tVm�"�,tp �� ei o `��om�W pf r r W��mr ! W W 2 m2nq r NOOV N NN N NOOV NNNNN HRH NN ;INV ONV c NNN NOWV NNN NNNNN HN N opp N N r r N N N07�N W C �p O V �p �p�p m WE88 28882 82848 AdNrvr 8*8,18 80;0704 22"8* Oam; No p A tip mmAa�v.0� 42,7,4* d mN <WOe f0 YY11 OOpp p� O W d mem �07 2 Nt�fh m 0 MfO OCd pN�dA n N g**** 2m2 22228 W O m)VU� T Tn r00 CP ONW N tc;O V n ON W tV{AV OggE mW m 4P8** 2N8*g NmmO W 88%%N W N rm mr m m -----) � � �.r)T N N N N o o N tOV N NNN N (c7.**** O*N t V N t V NNN N AA*** .v NNN N N NNN* N N 2 tr')7) L (V aaVV pp j E22 mrTNtOV rh21g N 2'°mN4 <POdOn m NN r * N24 Cl tg12 2iT A T O m A T d 8 2 2 7- 2 W W t 2 T H o � �rvnm �oW� � `8 W�om.gi �onTn �p m NA^m mMA r CW')NN` HMI<r pON NOW - �G d� Hill Mil tnr � Af.tG NNg I2 m1mni nn A��$ A`Mcil HMI mlliin 2Wg�22 W mA�W)`aW' 2$m ill Mil $8822 lam Salla NW" CN r ON ^ Nm W O VGN W Z"22 Tre;2 "2" OTN "O�iN�O0 2m ;7-1"" 422m '(22r682 mm O22 2 H ^ h NmW Ileh W 11$1O mmWmm qNWlN0W0f W;Mm !Eva ~E 8Wig N 4 STT2 W 88.12P 2g!.1-48 A22V< 6.2g to 8 84P 2 g W mM *0' 2* mN dmN MEN`m F4,5 mNG2NhVi' HNNN EENNry NNWWN NNH^m E00EE MNN ^2oENNoNN M55 NA G'�Ne IS cV pp o 2222G W n0�r; r h)V m OtWW) 68;7.,7,e NN Ntrn mCf0 qt -." pp r1Nn mAmIS NNm 20;02 mNN7 n mo 7„7.4 w417,22 h2p82n mmmAm 882282;2 Vtya vt:Nnna mTa mvHtgNm N $SHOW N^nA-:W *GAP* 48G** 0hmN V N820 meg m2 m Oh <2 spOrr d- P allo Et'-'61§ 2mnr2 m�m 22mrm q68mpp naps rn ^A^A Pm m2282 m Q..8; Tm8A a8a8P22*mg8 8* 88 6ESSO 08f p 0 N E Ol E $) v U ^ 0 0 hv nA o pC rm'-!2 nI�22 WgpON 2R g mOfA myW 0 Z mJO2 8V2A8 OOlg' ANN OX'-" I O O O ' M' ONppN 'eeEE nAN4 d J hmmm m m m m m mmmmmm.ilmmm mom.. m m m m Y<f O V O O C V C 74 0 4 « a 4°4064 OOOQ d NOm W N ' n A mmmvN00N22szsW Vassm $s :spa a — mbNN222NNEE 22NN2 bN22 m NN NN N N 00000 00000 00000 O O, 0.9.8! C 0 0 0 0 008-'0 0 0 " a N _ OO M Pg flT li mt7.-3.. N .. g.!, ;74 Otv"�f;(OV 02,3 1 Om O e S 22N RMi O_][o cE bNE �Np umf rO t7O MER On O 71 N W EEEEE •�mEEmm°°H 22228 747410•mnE 74747474 Cin v:pop S O 2.Fi n: chpi�.P;:,tTtOO $$r rm-On t0 0Ai roN-p(E,2 ,1,-.4g1 1,Y�-.4 N ant 00000 00 CO Wil 000000 0 m O Og OOO gY�a MEI 00000�0O O ggY� OO N �00g mNmmi�mif NNmmm Y mmmN .o.. 274 NNh m.oh J CN .00d v n74 ui0N M <0 0 m00 OO 740oO� r.:166,6mmrO tG� `�M N4,-.M0N- : 2; mNGm ammN �rnVti o mC0��nm0303 oegd NNP 747474 o� m oc`'i1No2N tim�w _C1 m Ac4 `�n3M mn cA n�1'�,3�,1 c�,'n $' 7444? "YY?? m 0000006' 2....,' 6'o+ NAiem ,98.'22gvO W2 v �2OMivn x^o O r.2 n:i umivmiv"iea n e4.414 ac' o�22m e122e " m - mtin N r a 01'.1' ''. -8 o U Z m pp.� pp�� O FILL a'LL¢LL2 o Y NOM1m 7410 20N0 H ,12;'2.."2t N n'�N mN N Om m Y 0 0 n o 0 6'Om r- N MPIPA AgAg� AM sX geWV' vv e m N 0 9 _ V 9 v.omm r-2 M(mo� :127,874 nm m^v mm " o oaoo m° 0) _r v 740 ON OO���gOggct sj ♦NmNP�iD A�M t0mh� ¢E �NN�N Y m v r Q M2e�M MI�MMCJ M2c'f 17 «< v OVays t4-4Z. p �1� <OVO C_�$ = O d . w Q 0 0.- m r w 2 m m m O W.$ �28;Av a�2 21'nilmo e<�2< vT rIV32 nr$ V o0p0 Z -� m N r W r-S 2 N P Ole EO P A O v-t i M 2 Of ah M Y N fG vio O O C m N m m m 10 1G !P O m rte" U �� 7 m g M m nMv35 'n� �n Mnn�o NMMV< vee < as a i =y T_ n m f U) C m m o • m e E-2 v a E 1O g.g >x �2Pigm w19i_mrnv°i_ �2v�m1Mc og2re'g MciN<88 eoo2 Sf1225g5 .c m 2 E V$ , tO r mm n m Nom 0 .i/.,6,.N M wmOlw Nm(n m�gAA $ �g8 5ia"��88 g 8 m �g$�g m8§ as<aaaaa pm ¢c ° 8 U $ g c a ; -fu� � � E r LL } o > Vy 74 6'9 UW � '.mr r' ;-1im H22g:2 V',TnNc1c18-12%,% 02V004:'ov O m O n mA " ooOMW unto. �mw. n� MNN�NWNNMM Mrj N N m °22mm742 22 22%2 � . e OOOO ` N 2 n n S N v m m 0 ',4!1;81c% N M M O O O N O N O g K 4 ` . 1"d,"1d1��o.Nv ioNM1n U �'r�gm;m 1$25 zd F r..--1. 0 'o0s00 NN" m$' aSe o mm z E N NNN N N N N N N N N N N NNN N N N N O X rim i 0 N!A m w ii In `�j(8i ^ 1�i W mr 0 O 818 m i y ',4 .%!8. op '4".“>,r, " EE 88v 88 <, m R o I C c S 18.44 b I�vOi�; EimmVth N Nm{DO4. poOO> b r004NN H V m mm2m2 m00f C 0 Ovf 2200 SDni012 W 2'M'222 m2Q1Q m LL GO bZmco m v U p p d a• 2 020001 n- LLy Q' 0 mLL CC 6. O N E44 U Pi Xg2 4- 1i ONN. 740OS0 g%• -NN NONON Q0Nn VIn CON. 0 0 0 0 0 O 2 M v m 10 W A •m O G (O - Co o s u N • s S i N• 17 E >r T - E4 Z Z { 1'n ..- Schlumberger t a 15 A CCC Drilling&Measurements MWD/LWD Log Product Delivery Customer BP Exploration(Alaska)Inc. Dispatched To: Christine Shartzer Well No 02-15B Date Dispatched: 27-Mar-13 Installation/Rig Parker 273 Dispatched By: J.Beckles/I.Carmichael Data No Of Prints No of CDs Surveys 2 1 jniy Received By: Please sign and return to: Hector Echeto Drilling&Measurements DSM 2525 Gambell Street,Suite 400 Anchorage,Alaska 99501 hecheto@slb corn Fax 907-561-8317 LWD Log Delivery V1.0,01/22/2010 P60 CMZ- 15& Prb Z(ZU'75u R , .games B (OA) From: AK, D&C Base Operations Superintendent(AKDCBaseOperationsSuperintendent@bp.com] Sent: Saturday, March 16, 2013 6:12 AM To: DOA AOGCC Prudhoe Bay Cc: LeBlanc, Joseph G; Kilfoyle, Jeffery A; Egbejimba, Uchenna J; Rossberg, R Steven; Sheffrey, Tom (Fircroft); Green, Darrell (ASRC) _ Subject: BOP Usage report T_erl 7/1g I( 7) Attachments: H2S alarm incident 3-15-13.doc BOP Usage Report for Parker Rig 273. The well was shut in with the annular preventer for a rig evacuation after a false H2S alarm on 03/15/2013. «H2S alarm incident 3-15-13.doc» John Rall Base Operations Drilling Superintendent Office: 907-659-4618 Cell: 907-980-2589 i Blow Out Preventer Equipment ( BOPE ) Usage Report to the AOGCC The purpose of this document is to ensure timely reporting to the AOGCC of any BOPE use to prevent the flow of fluids from a well. Pa � z7 3 Field Superintendent Name: John Rall Wellsite Leader Name: Ryan Cadenhead Contact Number: 659-4618 Contact Number: 659-5880 Traction Number: 2013-IR-4375993 Well Location & Name: DS02-15B Permit To Drill (PTD) Number: 212075 Date and Time of Incident: 3-15-13 10:00pm Original Scope of Work: Drilling 6-1/8" Production section. Operational Description Leading up to Well Control Event: Drilling 6-1/8" production section on Parker 273 when H2S alarm sounded. Well was secured and rig was evacuated. Alarm was a false alarm. BOPE Used and Reason: Annular shut to secure well for Rig Evacuation. Is a BOPE Test Required after use ( Yes / No): If no, why? Not required, used for rig drill evacuation. 24 hour notice required to NS AOGCC Inspectors prior to testing BOPE components. Plan Forward: Continue drilling 6-1/8" production section. Additional Comments: Instructions: 1. WSL contacts Superintendent with details of incident. 2. Superintendent then: A. Completes form with details from WSL. B. Emails copy of form to AOGCC. C. Emails copy of form to BP distribution list below. D. Email to AOGCC North Slope Inspectors within 24 hours of the incident: doa.aogcc.prudhoe.bay(a_alaska.gov 3. WSL enters completed form into daily drilling reporting system. 4. WSL fills out Traction Report and attaches copy of AOGCC BOPE Usage Form. Email CC List Well Site Leader WSL initiating report Well Integrity Team Leader Ryan Daniel HSE Advisor Jeff Kilfoyle Engineering Team Leader Ken Allen, John Egbejimba, John McMullen, Dave Reem Wells Operations Manager Steve Rossberg Wells Intervention Manager Doug Cismoski Organizational Capability Tom Sheffrey BOPE Usage Report for AOGCC August 2, 2010 HRE 1 oz--ITg Pb• Tti7_076-o Regg, James B (DOA) From: AK, D&C Base Operations Superintendent[AKDCBaseOperationsSuperintendent@bp.com] Sent: Saturday, March 09, 2013 4:28 PM To: DOA AOGCC Prudhoe Bay Cc: LeBlanc, Joseph G; Kilfoyle, Jeffery A; Egbejimba, Uchenna J; Rossberg, R Steven; Sheffrey, Tom (Fircroft); Green, Darrell (ASRC) Subject: BOP Usage report 1Zei[ 3/11'3 Attachments: H2S alarm incident 3-9-13.doc Parker 273, well DS 2-15B. Annular preventer was closed when the rig was evacuated due to a false high level H2S alarm. There was no flow or pressure on the well. «H2S alarm incident 3-9-13.doc» John Rall Base Operations Drilling Superintendent Office: 907-659-4618 Cell: 907-980-2589 1 • Blow Out Preventer Equipment ( BOPE ) Usage Report to the AOGCC The purpose of this document is to ensure timely reporting to the AOGCC of any BOPE use to prevent the flow of fluids from a well. Field Superintendent Name: John Rall Wellsite Leader Name: Joseph LeBlanc Contact Number: 659-4618 Contact Number: 659-5880 Traction Number: 2013-IR-4371156 Well Location & Name: DS02-15B Permit To Drill (PTD) Number: 212075 Date and Time of Incident: 3-9-13 10:00am Original Scope of Work: Running Casing Operational Description Leading up to Well Control Event: Running casing on Parker 273 when H2S alarm sounded. Well was secured and rig was evacuated. Alarm was a false alarm. BOPE Used and Reason: Annular shut to secure well for Rig Evacuation. Is a BOPE Test Required after use ( Yes / No): If no, why? Not required, used for rig drill evacuation. 24 hour notice required to NS AOGCC Inspectors prior to testing BOPE components. Plan Forward: Continue running in the hole with casing. Additional Comments: Instructions: 1. WSL contacts Superintendent with details of incident. 2. Superintendent then: A. Completes form with details from WSL. B. Emails copy of form to AOGCC. C. Emails copy of form to BP distribution list below. D. Email to AOGCC North Slope Inspectors within 24 hours of the incident: doa.aogcc.prudhoe.bay@alaska.gpv 3. WSL enters completed form into daily drilling reporting system. 4. WSL fills out Traction Report and attaches copy of AOGCC BOPE Usage Form. Email CC List Well Site Leader WSL initiating report Well Integrity Team Leader Ryan Daniel HSE Advisor Jeff Kilfoyle Engineering Team Leader Ken Allen, John Egbejimba, John McMullen, Dave Reem Wells Operations Manager Steve Rossberg Wells Intervention Manager Doug Cismoski Organizational Capability Tom Sheffrey BOPE Usage Report for AOGCC August 2, 2010 HRE 1 Parker 273 BOPE Test 2/19/2013 PBU 02-15A PTD 1960420 Remarks [Report submitted by BPXA] "Gland nuts on well head were leaking causing failed test,tightened gland nuts and test passed. Upper IBOP failed,cycled valve and test passed.Digital drill pipe pressure gauge at choke manifold was not reading correctly due to bad Battery, Electircian will change out battery. Secondary numatic operated pump does not activate until the system pressure drops below 1900psi, Parker maintenance will adjust operating pressures to meet API standard 52-6.3.5.9 prior to cutting casing to open formation. Function all components from LER,rig managers office and koomey unit. Test jt size used 4", start to test BOP @ 11:00 TO 22:00 total 11.0 HRS." Inspector Observations This Rig is starting out with good procedures for verification of accumulator integrity.They are timing the closure of stack components and using remote panel in Rig Managers office for closing and timing the closure. The only problem I witnessed was that their air pumps weren't coming on at all.After they performed their timed closure I requested they turn off the electric pump and bleed pressure to where the air pumps would actually come on. Air pumps were coming on at 1900 psi and stopping at 2500 psi. API RP 53 was read by Night WSL and Night Rig Manager. The WSL was using primary and secondary pump designation and I did not see that designation in API RP 53. I had a copy of API 53 standard November and I wanted to review that. 53 Standard states that Primary pump system shall automatically start before system pressure has decreased to 90% of the system RWP and automatically stop between 97%to 100%of RWP. The secondary pump system shall automatically start before system has decreased to 85%and automatically stop between 95%and 100%of the system RWP. I told them in this case to just make API RP happen or if it you felt better with Standard just do that but you would damn sure adjust the pumps. API RP 53, Section 12.4.1 (2Cfut s Z PLA-LA p sits tt-( - prr ,y ) "A pump system consists of one or more pumps. Each pump system (primary and s ondary)should have independent power sources, such as electric or air. Each pump system should have sufficient quantity and sizes of pumps to satisfactorily perform the following: With accumulators isolated from service, the pump system should be capable of closing the annular BOP(excluding the diverter)on the minimum size drill pipe being used, open the hydraulically operated choke valve(s), and provide the operating pressure level recommended by the annular BOP manufacturer to effect a seal on the annulus within two minutes." API RP 53, Section 12.4.5 "Electrical and/or air(pneumatic)supply for powering pumps should be available at all times such that the pumps will automatically start when the system pressure has decreased to approximately 90 percent of the system working pressure and automatically stop within plus zero or minus 100 psi of the BOP control system working pressure." 20 AAC 25.035(e)(4) (c fttt"es (�u iso st4gEe„` µ; 4,64 n "A BOPE assembly must include (A)a hydraulic actuating system with (i) ... (ii)an accumulator pump system consisting of two or more pumps with independent primary and secondary power sources and an accumulator backup system having sufficient capacity to close all BOPs and to hold them closed" PTD 2i2 —o 5 Ferguson, Victoria L (DOA) From: Ferguson, Victoria L(DOA) Sent: Friday, February 01, 2013 9:37 AM To: 'Takahiro.Kosaka@bp.com' Subject: 02-15B (PTD 212-075) Perforation Takahiro, PBU 02-15B is located in Sections 35 and 36 of T11N, R14E, UM. Per Conservation Order No. 559 (Corrected version with subsequent Errata; herein collectively termed CO 559),the Put River reservoir sands open to this well are located in the Put River Oil Pool. Per CO 341D,the Ivishak reservoirs open to this well are located in the Prudhoe Oil Pool. Rule 4 of CO 559 states that production from the Put River Oil Pool may be commingled with production from the Prudhoe Bay Oil Pool, and with other oil pools in the PBU in surface facilities prior to custody transfer. Well testing and metering are discussed in Rule 4 of CO 559 and in subsequent administrative amendments to CO 559. Please review CO 559 (with administrative amendments) and CO 341D and 341E (govern the Prudhoe Oil Pool), which are available online at http://doa.alaska.gov/ogc/orders/ordindex.html. Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria ferquson a(�,alaska qov 1 (10 Tr Er " d 1 ALASKA k� t SEAN PARNELL, GOVERNOR ALASKA OIL ANI) GAS 333 W 7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-15B BP Exploration (Alaska), Inc. Permit No: 212-075 Surface Location: 4830' FSL, 829' FWL, SEC. 36, T11N, R14E, UM Bottomhole Location: 4618' FSL, 3572' FEL, SEC. 35, T11N, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, r Daniel T. Seamount, Jr. Commissioner DATED this --day of June, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) RECEIVED STATE OF ALASKA ALA; _OIL AND GAS CONSERVATION COME. JION MAY 3 0 2012 PERMIT TO DRILL AOGCC 20 MC 25.005 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone 1 c. Specify if well is proposed for: ❑ Drill ®Redrill • 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑ Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name: 5.Bond: ® Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska) Inc. Bond No. 6194193 PBU 02-15B- 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11740'• TVD 9003' Prudhoe Bay/Prudhoe Bay. 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028308 . 4830'FSL,829'FWL, Sec. 36,T11N, R14E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 4572'FSL, 1896' FEL, Sec. 35,T11N, R14E, UM October 1,2012 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 4618'FSL,3572' FEL, Sec. 35,T11N, R14E, UM 2560 26700' • 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 64.00' • feet 15.Distance to Nearest Well Open Surface: x- 687567 • y-5950750 ' Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 16.Deviated Wells: Kickoff Depth: 5800' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 107 degrees Downhole: 3977 2 Surface: 3171 ? 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD ND (including stage data) N/A _ 9-5/8" 47# L-80 Hydra 563 2300' Surface Surface 2300' 2300' Tieback 8-1/2" 7" 26# L-80 VamTop_ 8966' Surface_Surface 8966' 8403' 266 sx Class'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 2874' 8866' _ 8301' 11740', 9003' 361 sxClass'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured): 12242' 9031' 11400' 12174' 9031' None Casing Length Size Cement Volume MD ND Conductor/Structural 76' 20" 431 sx Arctic Set 76' 76' Surface 2717' 13-3/8" 2050 sx Fondu.400 sx PF C 2717' 2717' Intermediate 10765' 9-5/8" 1400 sx Class'G' 10765' 8941' Production Liner 1805' 2-7/8" 109 sx Class'G' 10437'- 12242' 8700'-9031' Perforation Depth MD(ft): 10880'- 12170' Perforation Depth ND(ft): 9011'-9031' 20.Attachments: ® Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis IN Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact John Rose,564-5271 Printed Name Jo n E bejimba Title Engineering Team Leader Signature -? Phone 564-5859 Date 51a V/2 Prepared By Name/Number Joe Lastufka,564-4091 Commission Use Only Permit To Drill�Z�-7 API Number: Permit Ap rpvaDpte: See cover letter for Number: 50-029-20447-02-00 \\\\ \\\ ,. other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed metha e,gas hydrates,or gas contained shales: Other: 4-3 S—CsU PSt'' '+/ 7;S1 Samples Req'd: ❑Yes No Mud Log Req'd: Oyes No ZS /05.. ANK°'�'� I e4 ) H2S Measures' [ •Yes 0 No Directional Survey Req'd: LTJ Yes 0 No op Tse' �' / APPROVED BY THE COMMISSION /'i' / Date Va COMMISSIONS Form 10-401 Revised /2009 his permit is valid for 24 months UR MI NrIf. 20 AAC 25.005(g)) Submit In Duplicate by 0 To: Alaska Oil &Gas Conservation Commission ,� 1- From: John Rose, ODE I� Date: May 24, 2012 Re: 02-15B Sidetrack Permit to Drill The planned 02-15B rotary sidetrack is currently scheduled to be drilled by arker 273 beginning —10/01/12. The maximum anticipated surface pressure from the Put River sands with a u co umn of gas from TD to surface is —3171 psi (assume 9.5 ppg as max PP). This well will be drilled by Parker 273 using their 5000 psi four preventer BOP stack (3 rams and an annular). The BOP's will be tested to 3500 psi. The sidetrack plan for the 02-15B includes the following: 1. The pre-rig well work will include; a. pump —15 bbls of cement to P&A the existing 2-7/8" production liner back to 9600' MD. b. pump a second P&A cement plug (-100 bbls) on both sides of the 4-1/2" tubing from 9600' to 8100' MD. it- 3iI-310 lo, P � ..-1..,....0 , c. a tubing cut at 6000' MD. 0 G. 7 a2. Move in Parker 273 and pull the 4-1/2"tubing from 6000' MD. 3. Cut and pull the existing 9-5/8"casing from above the OA TOC at—2300' MD. ? k4. Remove the existing wellhead system. 4.1- 5. Run and fully cement new 9-5/8" casing from the top of the existing stub at 2300' MD back to surface and NU a new slip-lock wellhead system to that 9-5/8"casing. 6. Set and test an EZSV in the 9-5/8" casing at —5825' MD' for a whipstock departure/sidetrack of the well from that depth. 7. Sidetrack the well from —5800' MD and drill 8-1/2" hole to TSAG and run and cement 7" intermediate ,� casing. 8. Drill 6-1/8" production hole (Ivishak 1A/16). 9. Run and fully cement a 4-1/2" production liner. 10. Perforate the well (drillpipe). 11. Run a 4-1/2"completion with the WLEG set high to accommodate. 12. ND BOPE/NU tree/freeze protect well/RDMO well. Please find attached the 02-15B Planned Well Summary, directional plan and proposed completion diagram. If you have any questions or require any additional information, please contact me at 564-5271. 02-15B PTD Page 1 5/24/2012 Planned Well Summary et Well 02-15B Type Producer Object ve Ivishak API Number: 50-029-20447-02 Current Status Shut-In Estimated Start Date: 10/01/12 Time to Complete: 29.1 Days Surface Northing Easting Offsets TRS Location 5950750 687567 450' FNL /4451' FEL 11N 14E sec 36 TSAG Northing Easting TVDss Offsets TRS 5950448 685628 -8320' 704' FNL / 1117' FEL 11N 14E sec 35 Production Northing Easting TVDss Offsets TRS Hole 5950425 684850 -8969' 708' FNL / 1896' FEL 11N 14E sec 35 Target 5950440 683750 -8969' 666' FNL / 2995' FEL 11N 14E sec 35 Locations 5950430 683510 -8930' 670' FNL / 3235' FEL 11N 14E sec 35 BHL 5950430 683173 -8925' 662' FNL / 3572' FEL 11N 14E sec 35 Planned KOP: 5800' MD/5310' TVDss L Planned TD: 11,740' MD/8925' TVDss Rig: Parker 273 BF/RT: 30.81'/46.95' RTE: 77.76' 02-15B PTD Page 2 5/24/2012 Directional - Schlumberger (P7) KOP: 5800' MD Maximum Hole Angle: -42° in the 8-1/2" intermediate section -107° in the 6-1/8" production section Close Approach Wells: After doing the planned gyro work in the 8-1/2" hole, all off-set wells pass - Major Risk Analysis. Survey Program: Survey Tool Program Date 503,2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 113.76 5,788.76 02-15 Srvy 2 GYD-CT-CMS(02-15) GYD-CT-CMS G nodata cortcasng es 5,788,76 5,800.00 Plan#7-sr y permutations 02-158(Pan 0 CB-GYRO-MS Camera based gyro rnulostat 5.800.00 6,10000 Plan#i-soy pennulabons 02-158(Plan 0 INC*TREND Inclinometer+known art tend 6.100.00 7,600.00 Flan#7-srypermutations 02.158(Plan 0 MWD MWD-Stardar° 6,100.00 8,966.00 Plan#7-soy permutations 02.158(Pan 0 MWD+IFR+MS MWD*IFR+Multi Station 5,80000 6,100.00 Pan#7•srvy permutations 02.158(Pan 0 GYD-GC-MS Gyrodata gyrocompassing nus 8,966.00 10,450.00 Plan#7-srvy permutations 02.158(Plan 0 MWD MWD•Standard 8,966.00 11,739.86 Plan#7-srvy permutations 02.158(Pan 0 MWD+IFR MWD+FR condor Nearest Property Line: 26,700' Nearest Well within Pool: NA (not an injector) Formation Tops & Pore Pressure Estimate Formation TVDxx Uncertainty Oil Bearing Min PP ML PP Max PP UG3 -4809' Behind Pipe Wet 8.35 9.80 UG1 -5327' Wet 8.35 9.80 KOP 5816'MD in UG-1 Wet 8.35 9.80 9.80 WS2 -5896' +/-50 Wet 8.35 9.80 WS1 -6126' +/-50 Wet 8.35 8.50 CM3 -6360' +/-50 Wet 8.35 9.90 CM2 -6807' +/-50 Wet 9.70 10.00 10.40 CM1 -7404' +/-50 Wet 10.10 10.40 THRZ -7860' +/-50 Wet 10.30 �.66 . BHRZ/Put River -8050' +/-50 Hydrocarbon 6.70 8.80 LCU -8175' +/-50 Wet 9.60 9.60 10.30 - rt Ilk TJA -8215' +/-50 Wet 9.60 9.60 10.30 o 4y t N5 TSGR -8320 +/-50 Hydrocarbon 6.80 7.20 7.80 $33 l i it ('t Iv TSHU -8357' +/-50 Hydrocarbon 6.80 x900 • . '� TSAD -8430' +/-50 Hydrocarbon 6.80 7.70 42SB -8540' +/-50 Hydrocarbon 6.80 7.70 TCGL -8609' +/-50 Hydrocarbon 6.80 7.70 BCGL -8675' +/-50 Hydrocarbon 6.80 7.70 23SB -8746' +/-50 Hydrocarbon 6.80 7.70 22TS -8789' +/-50 Hydrocarbon 6.80 7.70 21 TS -8837' +/-50 Hydrocarbon 6.80 7.70 TZ1B -8897' +/-50 Hydrocarbon 6.80 7.70 TDF -8946' +/-50 Hydrocarbon 6.80 7.70 BSAD -8986' +/-50 Hydrocarbon 6.80 7.70 02-15B PTD Page 3 5/24/2012 Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD/TVDrkb Tie- 9 5/8" 47# L-80 Hydril 6,870 4,760 2300' surface 2300'/2300' ✓ Back 563 8-%" 7" 26# L-80 VaHCop 7,240 5,410 8948' surface 8966'/8403 ✓ 6-1/8" 4 Y2" 12.6# L-80 IBT-M 8,430 7,500 2863' 8866/xxxx' 11,740/9003' (-r100' lap) — 8631'/xxxx' Tubing 4 '/" 12.6# 13Cr-85 Vam-Top 8,430 7,500 8603' surface (-50' above TPUT) Mud Program Intermediate Mud Properties: FW LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH KOP to CM2 9.8- 10.0 • 5-20 20-25 <10 NA <20 8.5-10.0 CM2 to THRZ 10.4 • 5-20 20-25 <10 NA <20 8.5-10.0 THRZ to TSAG 5-20 20-25 <10 <10 <20 8.5-10.0 Production Mud Properties: Reservoir Drill-in Fluid 6-1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 7" shoe to TD .5-8.8 ' 4-9 20-25 >13,000 NC 8.5-10.0 <3 Logging Program 8-1/2" Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res (real time)for 1st BHA(KO Motor BHA). Den/Neu to be added for 2nd BHA • (RSS)to log the Put River and for the TSAG pick. Open Hole: None Cased Hole: Run GR/PDC log pre-rig. Log & record LWD GR a minimum of 300' above the KOP (tie-in log)/log 50' above a definitive correlation marker as part of the tie-in. 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/Neu/Den (both for the build and lateral BHA's-all real time (understanding . the DL limits for the stabilized ADN)) Open Hole: None Cased Hole: None 02-15B PTD Page 4 5/24/2012 Cement Program Casing Size 7" 26#, L-80 Intermediate Liner Basis: Lead: None Tail: Volume of open hole to place the TOC at 1500' above the top of the Put River sands+ 30% excess + 80' shoe track. Tail TOC at—1785' above the 7" shoe at—7181' MD. Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12.5 ppg (Mud Push II) Volume: Lead N/A Tail 55 bbls, 308 cuft, 66 sks 5.8 lb/gal Class G + adds— 1.17 cuft/sk Temp BHST= 182° F, B BD by Schlumberger Casing Size 4.5" 12.6#,L-80 IBT-M Production Liner Basis: Lead: None Tail: Volume of open hole +40% excess + 80' shoe track+ 100' of liner lap +200' of 7"x 4" DP excess. Tail TOC: 8866' MD (cement t TOL xcess to be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Volume: Lead N/A Tail 74.7 bbls, 418 cuft, '61 sks '5.8 lb/gal Class G + GasBlok+ adds— 1.17 cuft/sk Temp BHST= 193° F, BH .' by Schlumberger 02-15B PTD Page 5 5/24/2012 Surface and Anti-Collision Issues Surface Shut-in Wells: • There are no wells requiring surface shut-in in order to move onto the well. At surface, the 02-15 well is —60' south of the 02-27 well and —120' north of the 02-14 well. Close Approach Shut-in Wells: • After the planned gyro work in the 8-1/2" hole, all wells will pass Major Risk analysis. Note also, that the 3 Put River wells (the 02-27A and 02-23A producers plus the 01-08A injector) will be SI while drilling intermediate section of this well. Hydrogen Sulfide DS 02 is not considered an H2S site. Recent H2S data from the pad is as follows: (6) H2S Data Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) 02-15A 20 ppm 4/20/2010 #1 Closest SHL Well H2S Level 02-27A 24 ppm 4/23/2010 Put River producer #2 Closest SHL Well H2S Level 02-14A 10 ppm 2/20/2011 #1 Closest BHL Well H2S Level 07-34A 5 ppm 3/3/2001 #2 Closest BHL Well H2S Level 02-10B 20 ppm 1/29/2011 Max.Recorded H2S on Pad/Facility 02-27A 24 ppm 4/23/2010 Put River producer Other Relevant H2S Data There are no wells on DS 02 with H2S>100 ppm. (H2S alarms from rigs,etc.) Faults • There are no mapped fault crossing for this well' Drilling Waste Disposal • There is no annular injection in this well. • • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at . DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. - Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659- 5893) f/guidance. 02-15B PTD Page 6 5/24/2012 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be t, sted to 4000 psi. BOP regular test frequency for 02-15B will b1�4 .ay?during drilling phase and 7 days during de-completion and surface casing work. Intermediate Interval Maximum anticipated BHP 3977 psi @ TPUT at 8050' TVDss (9.5 ppg EMW) • Maximum surface pressure 3171 psi (.10 psi/ft gas gradient to surface) Kick tolerance 42 bbls with 10.8 ppg frac gradient, assuming a maximum 9.5 ppg max pore pressure in the Put River sands with a 10.4 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi 9-5/8" Casing Test/7" 3500 psi surface pressure Casing Integrity Test—8-1/2" hole FIT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner Production Interval Maximum anticipated BHP 3375 psi @ TSAG at 8321' TVDss (7.8 ppg EMW) .4.G1.1L la fir, Maximum surface pressure 2543 psi (.10 psi/ft gas gradient to surface) Infinite with 8.8 ppg frac gradient, assuming a maximum 7.8 ppg max Kick tolerance pore pressure in the Sag and 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Production Liner 3500 psi surface pressure Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel 02-15B PTD Page 7 5/24/2012 Parker 273 BOPE Schematic z -I s•' i=4 g 4' -ki1� 3 z .. CC rr r `4Y A at. a -' ...-'.4f " II J t 2� . , u,W —:, u _ vk�x WWW a. _ /y t' ~ J^1 �� ' `�' a 4. rG J ¢ , X72 EA3:: G (J is ~ 1 1 r r 1 1 7 '1 T T— T— 'n i i i t 2 2 / 1 i / r �t r i [J. — �',, , i,:., , i 6 6 , a r J� � = iiiiit si io 'I :•, Illi_, II , i 9 /9 / P ._.w �� > . '. r-ter' . , li.l - , ir , ; . 1 11IH- Y 1 1 1 1 I 1 , _ -- _— -Li$ itTyaEc 1 I W F lii - '� '' ii I Mbg ';z§ Sig= i (ri - aF di ...Itlitp.V7.t 1 1 :10 V .0-!7/11.::.; © T _ F c_ _= WW4l 04'`=1,.1;7_ -I- a �m {e.41ht.Lata �, T i a M i Iwilr dm YS W= f x 02-15B PTD Page 8 5/24/2012 Wellplan Addendum Contingency for well control when non-shearable equipment is across the BOPE shear rams This document will provide guidance for rig operations when a well control event arises and there is non-shearable equipment hanging from the derrick across the BOPE shear rams. Prior to picking up or running any equipment or tools in the hole, a PJSM and discussion is required to identify and note any equipment which will be run through the BOPE and is non- shearable. A risk assessment shall be performed for any equipment which is deemed non-shearable. The risk assessment must address the following: 1. Can variable bore rams seal against the equipment? 2. Can an annular preventer seal against the equipment? 3. Is a cross-over readily available to make-up into equipment? 4. Is a single joint or full stand of DP readily available to lower equipment below the BOPE stack? 5. How the equipment can be intentionally dropped down hole. 6. Are weights of equipment known so that hydraulic jacking force of wellbore pressure can be calculated. 7. Accurate and up to date shearing capabilities for the current shear rams installed is available. 8. Has each crew member been versed on individual roles and responsibilities? If there is a well control event happens with non-shearable equipment across the BOPE shear rams,the following procedure should be followed: 1. Based on the risk assessment above, gain control of the well by either: a. Closing the appropriate preventer(pipe ram, VBR, or annular)or b. Placing a sealable piece of equipment across the BOPE and closing the appropriate preventer or c. Dropping equipment and closing the Blind or Blind/Shear rams. 2. If well conditions permit, contact appropriate personnel. If not, proceed with well kill operations. This may include placing shearable equipment(i.e. drillpipe) across the shear rams by stripping in/out of the hole. 02-15B PTD Page 9 5/24/2012 02-15B RST General Operational Summary Proposed Pre-rig prep work: 1. MIT-IA. MIT-OA. 2. Injectivity test. 3. Fullbore P&A. (-15 bbls of 15.8 ppg G cement. Est. TOC at 9600' MD) 4. PT cement to 2500 psi. 5. D&T cement. Pull GLV in station 3. 6. Fullbore P&A (circ.) (-100 bbls of 15.8 ppg G cement. Est. TOC at 8100' MD) 7. D&T cement. Drift for jet cut on tubing. 8. Jet cut tubing at 6000' MD. 9. CMIT-TXIA to 3500 psi. 10. PPPOT-T and IC. Function LDS. 11. Set BPV and test. Planned Rig Work: 1. MI/RU/confirm barriers. 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high. 3. RU and pull the 4-1/2" 12.6#tubing from the pre-rig jet cut at-6000' MD. 4. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at-6000' MD. 5. RU E-line and RIH w USIT/ CCL / GR to 9300' and log to surface to determine TOC behind the 9-5/8" casing in the OA (est. TOC -2250' MD). 6. RU E-line and set Halliburton FasDrill bridge plug at-2600' MD and test. 7. MU a Baker 9-%" multi-string cutting assembly. Cut the 9-%" casing above the TOC as determined from USIT log. Establish circulation up the OA and pump a casing wash sequence designed to displace the arctic pack and to clean the annulus (OA). POOH, L/D assembly. 8. Change out to 9-%" rams, and test rams. 9. BOLDS, MU casing spear assembly and unseat the 9-%". Circulate the annulus. Pull the 9-5/8" casing from the cut. RIH with casing scraper and clean-out the 13-%" casing and dress off the 9-%" casing stub. 10. RIH with casing scraper and clean-out the 13-3/8" casing and dress off the 9-%" casing stub. 11. To remove the old wellhead, set back the BOP and make internal cut on the 13-3/8" casing below the hanger and remove the 13-3/8" casing hanger and wellhead from above that cut. With the wellhead removed, make an external cut on the 20" below the lower most casing head (will/may require some excavation) and remove same. 12. Run new gas-tight 9-5/8", 47#, TCII casing w/Bowen patch, ECP and ES-cementer. Land patch over the 9-5/8" stub and pull 100K over string wt and fully cement the 9-5/8" casing in place per the wellplan. 13. Continue to hold the 100k over-pull on the 9-5/8" casing until the cement reaches sufficient compressive strength. 14. Make Wach's cut the 9-5/8" casing at the appropriate height for the installation of the new wellhead. '15. Install a Cameron slip-lock wellhead on the 9-5/8" casing stub. 16. NU BOP on the new wellhead and test breaks to 3500 psi. 17. MU clean-out 8-1/2" BHA and drill-out ES Cementer and cleanout to the 9-5/8" FasDrill at 2600' MD and test the well to 3500 psi. 18. Drill out FasDrill bridge plug and push junk to top tubing stub at 6000' MD and circulate the well clean. POOH. 19. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at 5816' MD (competent sand / confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. ' 20. Pressure test the EZSV to 3500 psi for 30 minutes and chart. + • 21. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear-off the whipstock and displace the well to a 9.8 ppg LSND mud. (Above work approved per Sundry Permit#311-310.) This 02-15B PTD Page 10 5/24/2012 22. Mill a window in the 9-5/8" casing at-5800' MD' plus 20' of formation from mid-window. 23. PU into 9-5/8" casing. Perform a FIT. POOH for drilling BHA. b.8p •+�: 24. MU & RIH with an 8-1/2" drilling BHA with mud motor and mill tooth bit 5Ms DIR/GR/RES/PWD and drill establish the sidetrack and drill to"dull" the bit and TOH. 25. On TOH, RU and run wireline gyro inside DP from the KOP to -6100' (assuming 3 good surveys by that depth). With gyro work complete, TOH for#2 8-1/2" BHA. 26. MU & RIH with the 2nd 8-1/2" BHA with a RSS and PDC bit plus DIR/GR/RES/NEU/DEN/PWD and drill to the TSAG TD. 27. Circulate and condition the hole prior to TOH to run a 7" drilling casing. 28. Change upper VBR's to 7" casing rams and test to 250 psi low/3500 psi high. 29. Run a 7", 26#, L-80 intermediate casing and cement to -1500' above the top of the Put River sands (15.8 ppg class G cement). (NOTE: There is the possibility that this 7" casing string will be run as a fully cemented liner to 150' back into the 9-5/8" casing with a 7" tie-back string to surface.) - 30. Pressure test the casing/7" casing to 3500 psi for 30 minutes. 31. Change out 7" rams to VBR's and test to 250 psi /3,500 psi. - 32. MU a 6-1/8" BHA with DIR/GR/RES/Den/Neu with an insert bit and RIH to the 7" float collar and displace well to the planned 8.5 ppg DIF. r �T 33. Drill out the 7" shoe plus 20' of formation. Pull into the 7" shoe and perform an FIT. !� Y p/95 34. Drill the 6-%8" production interval as per directional plan to TD (will require a minimum of 2 BRA'S). • 35. Circulate hole clean, short trip as needed/MAD Pass where required. POOH. 36. MU and RIH to bottom with a 4-1/2", 12.6# liner from TD to 100' liner lap inside the 7" shoe. 37. Fully cement the liner to the TOL with 15.8 ppg Class G Latex cement. • 38. Set liner top packer and displace well to clean seawater above the liner top. - 39. Pressure test casing and liner to 3,500 psi for 30 minutes. 40. RU DPC pert guns, RIH and perforate. - 41. RU and run 4-1/2", 12.6#, 13CR-85 Vam-Top completion with the WLEG to be positioned -60' above the TPUT to accommodate the possibility of future perforations/production access. - 42. Space out and make up tubing hanger. - 43. Land the tubing hanger, and run in lock down screws. 44. Reverse circulate to seawater(surface to surface w/corrosion inhibitor in annulus above the packer). 45. Drop ball and rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. - 46. Set a TWC. T s r 6ro+M /344... . 47. ND the BOPE. NU the tree and test to 5,000 psi. • 48. Pull TWC. Reverse in sufficient volume of diesel to freeze protect the well to -2,200' MD. Allow the diesel to U-tube to equilibrium.- 49. Set a BPV. Secure the well. - 50. RDMO. Post-Rig Work: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser as required. 5. Perform negative pressure test on the 7" liner lap. 6. Perform well flow-back. 02-15B PTD Page 11 5/24/2012 02-15B Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Intermediate Hole - Given a max cretaceous injection pressure of 9.8 ppg, this wellplan dictates the use of a 10.0 ppg LSND mud from the KOP in the West Sak sands to the top of the CM2. With the pore pressure for the CM2 & CM1 to be estimated at 10.2 ppg, the mud weight will be increased to 10.4 ppg to drill those members of the Colville and on to the 8-1/2" TD into the TSAG. (NOTE: The max pore pressure for the Put River sands and the Sag River sands are 9.5 ppg and 7.8 ppg respectively.) B. Production Hole - The Ivishak in this area is expected to be under-pressured at 7.2 ppg EMW. This interval will be drilled with a 8.5 - 8.8 ppg reservoir drill-in fluid. II. Lost Circulation/Breathing A. Intermediate Hole - While no major lost circulation is expected in this interval of the well, breathing and/or lost circulation is a possibility due to the moderately shallow KOP on this well which exposes all formations from the KOP to the TSAG to drilling ECD's associated with the planned 10.4 ppg mud density. B. Production Hole - The lost circulation risk for this interval of the well has been characterized as "low". III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is 42 bbls, and for the production section is infinite. B. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-%"window 20'-50' from the 9-%"window FIT 10.8 minimum 7" shoe 20'-50' from the 7" shoe FIT 8.8 minimum IV. Hydrogen Sulfide While there are no wells on DS 02 with >100 ppm H2S, operations should adhere to the guidelines in the ADW"Hydrogen Sulfide" SOP. V. Faults - no mapped faults. VI. Anti-Collision Issues A. After the gyro work in the 8-1/2" hole, all wells will pass Major Risk analysis. B. 3 Put River wells (the 02-27A and 02-23A producers plus the 01-08A injector)will be SI while drilling the intermediate section of this well. CONSULT THE DS 02-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 02-15B PTD Page 12 5/24/2012 TREE= MCEVOY SAFE' 'OTES: "*WELL ANGLE>70°@ 10887' WELLHEAD= GRAY 0 2-15A *** ACTUATTORR= AXELSON KB.ELEV= 64' BF.ELEV= i-4-1KOP 3200' 5-1/2"TBG, 17#, — 25' Max Angle= 92 @ 11713' L-80, .0232 bpf, 25' H 5-1/2"X 4-1/2"XO, ID=3.958" Datum MD= 10660' ID=4.892" r,,.�G.1f c / ,_14 1''' + rcrc• i G,,., Datum TVD= 8800'SS 20"CONDUCTOR,94#, H-40, ID=?? 110' O 2158' —4-1/2"HES SERIES 10 TRSV, ID=3.813" 13-3/8"CSG,72#, L-80, ID=12.347" H 2717' v1/4444/ , 're) , Minimum ID = 2.387" @ 10443' Vtoo 2-7/8" LINER, PIN ID -"^^^ "`" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Z • 1 3758 3736 21 MMGM DMY RK 0 04/10/07 4-1/2"TBG, 12.6#, L-80,TDS XO NSCT H 7861' c 2 *7194 6371 47 MMGM DMY RK 0 06/29/04 3 9487 7995 40 MMGM DMY RK 0 ""COULD NOT PULL#2 ON 6/29/04 9-5/8"CSG,47#, L-80 XO S0095 H 9284' x M..� x�LOb -(u i R 9681' —9-5/8"X 4-1/2"TNd HBBP-T PKR, ID=5.00" I VD 0ç1c 10400' —4-1/2"TW OVERSHOT SEAL&RISER, ID=4.38" fi dd 10413' —19-5/8"X 4-1/2"TM/HBBP-T PKR, ID=4.00" s 4 . _. L TOP OF 2-7/8"LNR-CT H 10437' 1 10437' H4-1/2"BKR DEPLOY W/G NECK, ID=3.0(11 10443' —3-1/2"X 2-7/8"XO, ID=2.387" 10446' —14-1/2"HES X NIP, ID=3.813" il . 1 I 4-1/2"TBG, 12.6#, L-80, H 10468' I— 10468' —4-1/2"WLEG, ID=3.958" NSCT, .0152 bpf, ID=3.958" 10466' --I ELMD TT LOGGED 10/17/95 9-5/8"CSG,47#, S0095, ID=8.681" H 11037' 1111 111111 111111 111111 MILLOUT WINDOW(02-15A) 10765' 1�1.1� • 1�1�1* • PERFORATION SUMMARY 11111 ��� 1111. 11400' CTM —12.2"WFD CIBP(06/13/07) REF LOG: BHCS ON 07/02/80 111111 1111111. ANGLE AT TOP PERF:72 @ 10880' 11111111111111111`1 4 Note:Refer to Production DB for historical perf data 11111111111111111111 SIZE SPF INTERVAL Opn/Sqz DATE 11111111111111111111 2" 6 10880- 10900 0 04/22/06 2" 6 10920- 10940 0 04/22/06 2" 4 11060- 11070 0 07/14/96 /0v . 2" 4 11220- 11370 0 07/14/96 PBTD X1111 12174' X100, •2" 4 11314- 11370 0 07/15/96 •••4,• OZ OZ —(< 2" 4 11420- 11600 0 07/14/96 2" 4 11630- 11800 0 07/14/96 2" 4 11830- 11990 0 07/14/96 2" 4 12060- 12170 0 07/14/96 2-7/8"LNR,6.5#, L-80, FL4S, .0058 bpf, ID=2.441" H 12242' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/05/80 ORIGINAL COMPLETION 05/10/07 RDW/PAG WAIVER SFTY NOTE DELETED WELL: 02-15A 05/08/90 AUDI#4 RWO 05/11/07 JAD/PJC SIDETRACK CORRECTIONS PERMIT No:r1960420 08/14/95 D16 RWO 06/04/07 DAV/PAG SSSV CORRECTION API No: 50-029-20447-01 07/16/96 N2ES SIDETRACK 06/13/07 HDR/PJC SET CIBP @ 11400'CTM SEC 36 T11 N R14E 21.43 FEL 677.51 FNL 05/30/06 DTM WELLHEAD CORRECTIONS 04/23/11 MSS/PJC TRSV CORRECTION 04/10/07 DAV/PJC GLV C/O BP Exploration(Alaska) TREE= 02�15 B WELLHEAD= SAFET Y NOTES. ACTUATOR= AXELSON KB.ELEV= €4 Proposed RST BF.ELEV= KOP= 32'`; Mak Angle= is H liyd 563 ( Datum MD= L. CB f.,.....DetumTVD= 8800"SS I ( I:.ir2 S 12o-common mon 941.H.40,ID- H 110' ES Cementer,ECP,Casing patc* GAS LFT MANDRELS 13318'CSG,723,180 13=12.34r 2717' =T MD WE DEV TYPE VLV LATAl_PDF'T L4 TI 1 Minimum ID = 41° �I 9 5 8 whipstock at -5800 + PERFORATION SUMMARY �. R$'LOG: r.,......... 11111114' ANGLE AT TOP PERF Note:Refer toProd)uctonDBf°rhr-1_,,_ ... 1'SQE SPF NTERVAL 0 I g-S,rr CSG.471 S0095.D=8.681' H 11037` ( iip,1!1 ( (--(rx4-1/2 la1CY13CrhbFng (1 —8700 PUT RIVER dI —8800 HTOPOF 4-1(2'LNR LNR l —8900 1 150 7"©TSGR itija.% ipL '\ K 1 4u7i,e7 / 4-112 L-80 LW H —11800 I A 90, DATE REVBY COMMENTS DATE RE BY COMMENTS BAY UHT07(0580 ORIGINAL COUPLETK'kl ":510107 R!).WPAG WAILER SFTY'NOTE DELETED WELL. 02-158 05'0890 AUD134 RWO 05111('07 JAp'PJC SIDETRACK CORRECTIONS PHi.ITNo. 08!14(55 D16 RENO 061'04!07 DAV/PAG SSSV CORRECTION AR No. 50.023-20x47-0;' 07/16196 N2E5 SIDETRACK 06/13/07 1DR(PJC SET CEP 11400'CTM SEC 36 T11 N R14E 21.43 FEL 677.51 FNL Lb 3C/06 DIM WELLHEAD CORRECTIONS 06/15/11 MSE PROPOSED RST i10007 DA V.'PJC GLV OD BP Exploration(Alaska) 02-15B PTD Page 13 5/24/2012 N m .^NO)W 0 N NN00 MNONO ON010 W W OO)h OD NO)W OD 15 V : V M W N h 0 M O)M. 0 0 V V O e-h N-0 0 M 0 V M W M O)e-0 a . ,...:,6 Ib W N V ONh-N 060;666 00060) 60)00 .- 2 M M M M M M V V V V V V V V V Q V 0 U) 0 0 0 0 V v V 0 0 U) 00O0 0 O)W o)W 0)0)0)0)0) 00)0)0)0) 0)00)0)0) e)0)00) OI o W N N N N N N N N N N N N N N N N N N N N N N N N N N N N CO J `N N W N a)0000 N N N mW WmN N N N N N CO N N N N N d V V V V ..... ..... .....v.VVVV V V VVVV V V'V V V V V 3333 33333 33333 33333 33333 3333 Lo U1 --OWNh b WVW 000NN Nh WNh hOMee}}0 0WN N V : V M M M M M N N o.- 0-0-0(00 0 W N N N N W W O V v V V 0 V 206666 p006_O 66666 66666 66666 6666 N J Z tD tD(D LO 000 0(D(O (D(O(O)0 0 0 0O(O,O 0 (O(O t0(0(O )p(O(O 0 N B0000 6 0 0 0 0 00000 00000 00000 0000 M h h h h h h h h h h h h h N- h h h h h h h N-h h h h h h N N Z Z Z Z Z ZZZZ Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z EO1 N W O N o V W N COh MmN- N 0 N V V M N 0 0)0 0 0 A C w o N N 0 N N O O O .-h W N N 6,v-.66 0)0N)0.V 7 W N N Q N00N 60,-N:6 h N N O 0.0,0-0-00 Np M^0 or-r--: m ^NNN GI 12 *-VmN phe-00 NM0mN h0NJ OWWO 0W NNNN N 00 WWW0N Na0NON ODhN-NCO NNNN- M W 0000 400000 00000 00 0 m 0 00 0100 0000 N OO N m N N N N N (0(0 0 a) N N W N N N N N N N N N N N 0(0(0(0 00000 0000000 N b 0(O t0 0 t0 c0(0 0 (0 0 0 0 O) V N N 4,00-V00 ON-O(O M Om.-NN 0(00 0 W 00)0)M C m N 0 h W N N h 0 0 h N)M IC) 7 M N N N V 0 N M W V(O N t ?W N(0 0 ed V N N (s, -(6,6,- (0N-h(0 O N-0 N OM h O LVVVV aVMNN aa000 00N0 N00M MVV0 p ZVVV0OVVVV 000RV VMMMM MMM.V OVVV D 0000 mmu0 0m0 000m0 0000 000WWWWWWWWWWWWWW0WWWWW0W00000 00000 00000 00000 0000 0 0000 _1 — „ .c _1 _, O CM M M U) d d N _1 ..-V,-00 00000 00000 00000 00000 0000 00000 00000 0.00.00. 0 0 0 0 0 0000 O 0 0 C N Q 0 O W N O ,i4-444- V V V R V 00 a*avv-v-66 d V V V - 1t8 ,22 .8 0 -H 0 0 o CO e r N O o m E V 0 m N- N N( O 0 0 C) U) O N O O 0 2 N o M h M N 0 OD - Of- O N 3 N M O L ,-M M O W 0 W N 7 N N^ O N 0 W O N t0 0 1=.-. O M N V m M N V 0 0 o O h N r- O 0 O M o p N )O N O 0(0 N 666 r 6 h M N N V (O O)N em V 4661,eO 0 N- -0 N M V 0 h o(O N o V h h W W 0 0 N N N N-h N (O(D m m m V MMMM M V V Ino LUN N(0 N LUh hhh N-N-NN-N- hr hh 0 06 O9 CV CE ti m G C O -. O V f V O E C m V Q 5. E 'm g m o c c r c o 0-.., - y .m c F. m S = V o c EQ O W U C C 0 m C m w Z n W N O 0 p N W WN N N N V b V')NM V h 0-0-000.M 0 -M n•-O N UCCmm _ mQN _ Um01m Z 00rh pMNrOD 0bh rNNQN NNOWN N-O CO d Od . NW�� N-n�VNmmOpOrW LU NeN- LU0r M JUU C 0om 0 f V Q o N 0 OQV Q CQ w > OODD ONN NO0 0001[ N N N NN N N N 7M(! O (?MC) ° C.:” N''."1 N yp m m NoC80 O Lf. C N (m_) Cm_) m m d C = CCC -C U U N O to ZCCQO m 0:20 ,7› ch rnVUQw Omm > > mm0mmmp _ OO 0 L N » 1- Hm2H2Q2Z71-J QM 0 UMN ONV 0W(OVN NOON 0NNV NVNpV mO0N 0 WWCM0 mV0WM 0VNMN- N-00Mh 0-.0 - (00 0 0 (I) N 0 0 W h 0 0 W N O(0 0(p N O N)h(0 W W M N N W O)W 6 LU w > 0 N h h 0)N N M N M M W 0) N R N-N N 0/00004- h h N 0) ^ M M M M M V V 1010 N N N N N h h h h h h N WNN- h N-h N M c Mid (0 m M m Q W N - N-O O W N 8421 NNh W(O NLU 0 C` O O N h0 O (O h W N V > h `N (- U400 e-OOM NUqN OtiNN- NofW WNN O 0NhN OVNOW Nhh0 hONMN N00Nh 00000 MMMM 7V000 hNWo0 ONM7V 0Nh00V 00.00h d W_ _ 0000 m0000 00010 N 0000000 N N N(o h N.h hh U) 00 MMI U- C0 AWNJ N M= h IMM 0 .76 „ o e h0hh 0)M0 W O MN V N W N(0 N...0) no*-,-*- '-W N V 0 0 0 0 -. )00(0)0 0 V 0 0 0 N*-0 of 1. MMM,-M N 0 h N-h h W W N O U) N F 0 U)U) 1(j 0 U)V 7 M N 0 0 1- h N.h M M W 0,W Co N-W h 02 C N N N N 0 CO N N N N N N N 0 0 0 0 0 o N N 0— N N N- N O N NNNE N N N N N N NNN NN N N N N N NM M N N N) N (() 62 .4 .N Q -- . 0 a ;- ,,-7w N x a w . Y W 0 y - ui N N r V A N _ Q = V W 0 0 0 0C.W m000144-M 0) W 0 0,0 N)0 N N O 0 N- N.0 0 M N 0 M O C ""V W h.- h O?O)6 W N66,:*- W000,0 (O(O N 0 N O h N 6 N h V e- C 7 ON10 _. - 0 .m O 66*-.- p M V 0(O N W 0 '- 00N- V N M M M M M N W r', 2 ›..°7 m h V ' M N h V V V V ?M M M N N0-0-,-,- O o N' 0 ,T1'- o --- m 0 W W N8 m o _ O o N o Q b 0 W a O N N m N h O 0 WN- X .. N00W0 ONO0NW V — N ' NQWmmd0Nm0V mmaQoa100mNZZZ -0 0 ==000 N 0000 000 M 0 (ON h00 00 OM N 10000 .0000 00000 N h N(0 0 o O M p V M O O D NON W 60000 OOONO 0ri W U)0 66r..:Nici NOOO 00 N (00000 00000 0-0,0-NO 00 V N N N 0 0 0 1,-03003 C0 W 0 N M V 0 10 N 00,m0 h N N er 0 00-NM E y 0000 (00 N(DN NNN(oo LU(0 N(0 n N-h h hN NNN o « m .15i. Wm m o ^ 0) m j< U o W C rn Y aci o ` o LI' r`o vi 0 o EI '- 13' ` J Z Y 0 N (n 6 -- m - >n O«O m E °: SV m m° m 6 m m o Q 2o a Q m m Z Q = m C C m C _azo O Oo r m m22041 E am - : - mAllCouum:13 E com2 0 N c^ m cVm N c m - d 0 O a > > 0 0 0 O m c o ti) N R' UILN3mamNHUJJU(7 0 1-1-MO 3 w300 000 0 p N W .1-.0 C')mn W.r MNI-CM RNN Ob 0,000,0 NC')Ctiab Nm r`W a MN M(')a CONNa C')C')C'] p 17) : 7 V r.N O N M Cti V'COO N a C COC 7000,0 p a M W O W W m V M O W)O O N a n m O O) O M W O)O m O O ✓ :Cj a e� er)CC)CC)W CO W ri n(O ,' M C'j CO CO n 0) 'M W CO W O)O 66646 n n W N CO CO C0 C0 CO C0 C0 C0 C0 C0 C0 CC)0 C0 CO C0 CO r T-,- T-.-a CO CO CO C0,0 C0 CO CO C0 CD .7.›M m O 0)0)m m m 0)0)m O) C m 0)m 0) 0)0 0 0 0 00000 00000 00000 00000 0 0 CT o W N N N N N N N N N N N N N N N N N N M N M N M C')M C) M M C')M M M MMM M M M C)M M M M M CO -1 `0 CO W CD W b CO W CO W W CO W CO W CO CO CD W CO W CO W b W b CO W b W W CO W W W W CO W CO W W CO W W 0_ V a.r.{av V V Vaa .}aeras 'QaQa .ra'C ' aagaa aaaaa aa.t.aa aaa 3 3333 33333 3333 33333 33333 33333 33333 33333 333 a 0 ,."0 M p a.r Q p p.r a VVVVV V W W N M M N N N '-'-00M 0 0)0)0)0)N N N W N 'O : CO COCC)C0 CO CO CO C0 C0 C0 M of MMMM 6,06,06 M MMMCn oo,0 MM MMmm m CO W b W W CO W m a 206 OCj o O0) OO CJOO 66666 66666 Cj OCj OCj OOd OO 00000 66666 000 N_ COOW WbbWb CObbbbW CObW bW bW CObW bW CObWbWb COWW bWW COWWWWW COWW bWW COWWJ2_ N '''CD 00000 00000 00000 00000 00000 00000 00000 00000 0 0 0 C) n nnn NN. N.i.r.r.nNNn r.n r` Nr.NNN N.nr.nr. Nn C.Nn NNNN N NN r.NN NNN N M Z ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZZZ ZZZ 0=1'.. CONN 0 V' �O bO) N W)W N C')C.NbN .r 0)0 W Ch 0Ner CO CO O N 00 W NaNN0 000 C(0 0 CON m O b 0 b 0 N M V'a C') ' Cry M N.a 0 W p n p M N W W N 0,-000 N N m a W 0)00 =N M O C)b b CO O U a CO O eiA O O n n j a O N OW^ n N Cj W W O W O W a N CO-N O W Cxn WOOnb MNN O 0)0C nO,MOW MW \OM MON00 ONWOO NN 0N N.. n .NWB CObbbW 0O0O COVarM MNNNn nn000) COCOn COWOW0 CO)' W CO COC0C0OO M00C00 m00000 00000 C0OCOOC ,00a aaMMM MMC' MM MMC W W CO CO W W CO W W W W CO W Cp W Cp CO Cp W Cp W CO W CO W b COW b W W CO W W W W CO W Cp W W CO W W CO CO b b CO b CO b m b W CO W CO W CO CO C0 W C0 W CO W b W C0 CO W CO W W CO W W W W CO W CO W W CO W W mMer 0 b C)O N W W N m r'b a b W C')0 v000,0 0 W 0 O) 0 CO 0)0 a N W n W N O N 0 000 C -.%- O n b O b COO 0)n V m.-1-.,-0 W b N CO CO 0 0 CO VCO N ON\N V 00001, N 0 N O)0 000 K,-W O L ,-666c6 COCO nn n NNCO W)O 'CN 'O 61,:i<66 MNCT0 W 64660 OaV:MO 00)0 CO W O t O OMVaVVVVVa rarav. veava 'MCMN MMNNN NNaaC MMNMM WNW WnM 8 O o Z O 0000 OO00 000ppaOnOO 00000 00000 OOOOO 00000 OOO COMW CO M 00COMMMMMO MOMOM OMOMO MObOb OOMOM MMMOM OOMOO COMm 'ln W M 0) mmmmm 0)0)0)0)0) 0)0)0)0)0, 0)0,0)0,0) mmmmm mmmmm 0)0)0)m0) mmmmm 0)mm W W W CO CO M M 0)M M b b M CO b CO CO CO M CO M M 10 CO M COM COM CO COM M M CO MMM M M CO M CO CO CO C0 C0 W W W W N 0 00000 00000 00000 00000 00000 00000 00000 00000 000 _1 ,0 00000 00000 00000 00000 00000 00000 00000 00000 000 0 O a 40000 OOOOO CO W Cp W Cp W CO W CO W CO W Cp W O O W Cp W W 66644 a0).ras 446 ^.CO CO N CO m CO 0 00 W N O.r M m 0) .N W N CO V N N W C)M N a M 0 0 W N W CO 0 W 0)0 0 ,_000 n W �T- N4,666 n b N n.- r`CO V'V M N.-66,-6 0) CO MMCO m60,66 N.-.-W m V V 0 M m n N N ,-000 0- ON M Ori N CC1 NCC)m o C)Oi NCO 6,6666 Cj ernCO W.-Cj NCO aCNM a m r.NO Mao .C'?NO O N -V'V'M N.00 ,, W n W NCC) N0 Mn O Nmm W MNM W W NCOON W Mu')C0 W W 0N0 ,000 0] W W b b m0) 0)0)0)0)m m0000 0 N NNNM V aaCO CO W NN-000 mmm mO 004 CO N M CO N N N N N NCV N N N N N N N N N N N N C')C)C!) C)M W C'1. 'rV V 'CnO a C i t 0 00 N 0 M W W o ZCOCOC Cp CO N 0 C C/) E-"0) CO M m N O N O m n M N C.W 0 N N m o M N6,-a-,- 0,-m00 0 M m N 0040,00 N Z • a M0,.-, 0 0 0 0 m mmm m 7 C)V r.m 0 V M O . M W N MCO 000.-V O V CO N N N O W 0_ a �} V' V C')Cry M Ci MCj Meeir ae}a� a CC)CO CO CO CO CO CO NNN nnC LOCO Nn r,N0) 666M M uo Lo o C)C)C))Cn CO Cn M Cn C) C0 y)C[i 06 C0 M Cn M M CO CO M CO M CO M r N N N N(',IN N N N N N N N N N N N N N N N CNN N N N N N N N N N N N N N N C'1" N N N O N 0 6 0 U .0^.a NNN)aCO O^C.m CO MNMO^ 000,0N N Mm W' NNN a M W W MCO MNNNN V V) Q W a 'C.N aM N V'm N COMN N NCC W O N M MNO '-000)0) CD V n-'N V V o Na NCOm CO !/) CO NOiO NC') V'NC) 'CO . 0)h W.r m COa Cp 6.6 6 OCO Cj 0)N CO W M V W OCO m NNCO NM0) N NCO br\W 0)m N MC. CO NM CON N OO W N CO W b nn M W ON CO MCO C0 W C0 CO nm CO CO CO CO m0) 0)0000 00000 0,-,-,-c4 N MN C') aaCO CO W Nn W W W mmm 0)0 OOM «' N N N N N N N N N N N N N N N N N N N N M M M M M C)M a a a a C J T CO CO • C) O 0 0 m b b CO b CO b b b m CO 0)CO N CO 01,0CO CO W b m b N b N N CO CO W CO m M W.- CO NCO O N CO m W 17 > =0, CO r\n N r. r\r\r`r`W r`CO r\N N V N'-r\M r\r`r\CO r\ W a).m W n W O n C) O V n C)W N)O N H CO N. `0)N N `N R a n n M O 0y n CO Co N^N r 6066 CO W O W 7 m O CN n n n N 2 CO 0CNNC0 mm0MW OM NCO 000WNO CO On W0)NNa aaaaa NNNNO 000 l CON WfNmaC0O0COmCnCbWCOWm0WOO0)00000000O00mOONCDWO COCD CO D COCbDC0O p 00000000)0O 2 7 W a 2 CC e M CO CO C0 CO M C0 C0 C0 C0 CO CO a b a W C0 M N m m n C. N M C)W N o W W o W a s.r M W O C0 w, ��7 ` ..0 00M CO WC. Nn W b W COC y)CO C0 oCOr.r0) ONNOM 1-1-0,010 O V V ZD,I. H 00000 00000 66660i maj moj m O 0)o)mo 0)00,mm ONNOO) 660666 0 ' " .-W N n r.C.n n C.r.r.r.n n n b W CO CO b W b W CO W CO W CO CO W CO W W n n n n W CO W CO W W n n n .-‘2-ix EE N N N N N N N N N N NN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N T- TJ Q WO_Z W n, u_._, ) C V M W O CO 00000 00000 NC')O C)M Mb Mn M O M.r 00 O Mq MM 0000N n n M O m 000 0 ,-,0_ C `.1 OOOOO 00000 0)m.r ,0)n O?NMOM V'O?NM W W W.r W W MO O M N W W 0MM O W W - M W N M MM MM M C)M CO 0)0 00,000, 'O,N N O 0100100 M W CO 66, 64 66666 W W CO M r-66 6 a W n N NN C')M a.rC 0 M D)W CO CO W r.N W CO 0)0)0)0) 00000 0)0)0) a W M C) J m M N COJJ C) W Cn W W LL LL N 0)m W m N N CCCOCOCO• -Ia a a 0 =0 C')NN M.r ,-6o....6 0 C') CO .TOMO 0000,0 Q 0C') N 0000 CO M a a o W NCO0 0 ,-040 ill 0 66m6r, W o.-W W ONoN ON or.O m Ob m0) 00 -O0) MN000 T-N1000 NW °)r0) O 6,2:,466 N OLO O 'COC7OCV 0 'O O CO OCj MOj N ONO O W n N W O W W '00 N Mm CO.a,co o M b O W C0 CO m CO N.o m o r. O C0 o Cn O 00 W N CO O CO 0 0 CO W a M 0 n W m 0 0 0,-M 'C V a V'b N b CO m m 0 0T-T..0.10, M C)a.r M 00,00N N W CO 0)0 00,-,-04 N N N M a a a N = CO CO CCD Mb CO W W m 0) )0mm 0)m 0)0)0) m 0)0)m0) m 0)0)0)0 00.-.1-1- ..... ,-T-1- C/) CO 0 0 0 CO z aN a..--. Nm a 8 N 0 O 0 0 H O 1- O E E ,ixec-� . 0 =W ¢ co 0 (D 2 o) covD01 `o mvam vat My E O C==NU -,Co a co N U U C'I N C N Z O N C L CV CQ N C0 'C U W r_CO 0 J F-C-r.l-O r- V' r- 0) N N N W F- 0 1• O W U O W O r- O W F 0 by 0 Schlumberger WELL FIELD STRUCTURE 02-15B (P7) Prudhoe Bay Unit-EOA DS-02 Magneto Parameters Surface Locaton NAD27 Alaska State Plane.Zone 04.US Feet MocNeneous Model: BGGM 2011 Dy'. 81018• Date: January 15,2012 Let N 701813.038 NOMarg: 50.0]50.38 RUS Grid Cony.142800192• Slot 02-15 ND Rot Rotary Table(77.1BR above MSL) Mae Dec: 21 278• FS 57835.Air Lon: W 148 2858.730 Eastrg. 88158881 RUS Scale Fact.0.99993897 Pon: 02-15B(P7) Si y Date:Mary 17,2012 1200 1800 2400 3000 3600 4200 4800 4800 �•as Tie-in Survey Top Whipstock Base Whipstock 5400 Cry 4/100 5400 60006000 End, Cry 4/100 6600 6600 End Cry II N 7200 7200 a Cry 4/100 7800 7800 End Cry 02-15B Tgt 1 P •r 8400 3 a 8400 02-15B Tgt 1.5 Sag Guide Pt Cry 81100 02-15B Tgt 4 End Cry Cry 14/100 End Cry 2-15 9000 ' �2-15B(P7) 9000 End Cry Cry 8/1013 TD 02-15B Tgt 2 End Cry Crvl4/100 02-15B Tgt 3 1200 1800 2400 3000 3600 4200 Vertical Section(ft)Azim=263.44°Scale=1:600(ft) Origin=0 N/-S,0 E/-V O O O ., o o •o O 111 L li h Y O e m O e o t 'a U a t v U t0 W t 9 U A U W W '5' O C2 O t••µ O N y•Y. N r v o 1� r. m t9 n CO i e 1 INCEI % U s r rc AR t� n CD r U r} O e O C f b rcA N a N w 2 m — A 0 N O N s CI f,'54p W p ss p o a. p n M a a. O n M _ m U " o 0 fir- LP E i a— II ods M e c7 U W gu- 3 � I n2. U 13 ....jv $q� H 1,...... £ p r / p 4.1 _ £w v m 8 10 U 93 U ^^a- 0- 0- o$ d W e qZ'i m N p R p I 3 a 93 8LL c O O O ok: O O N 1. • O I n AA ti s e LL. 0.- um, o o s o PI N Bmi E� � O pO O O A IA U? p N f f 1 «< N (14)0054 =algin s >>> 95— 90— 85— 80- 75- 65- 60— Z O 02-15/02-15 O 55— • 50— N o• 45— O N C �j 40— 35— 30— 25— Project: Prudhoe Bay 20— Site: PB DS 02 Well: 02-15 Wellbore: Plan 02-15B 02-15/02-15 Design: Plan #7 02-15B 15- 10— 5— /Equivelant Magneto Distance 0 UL-1b�UY-15 { I I l f I { I I { { I I I 5800 5900 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 Measured Depth (200 ft/in) Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-15 Project: Prudhoe Bay TVD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Reference Site: PB DS 02 MD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-15 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-158 Database: EDM .16-ANC Prod-WH24P Reference Design: Plan#7-srvy permutations 02-15B Offset ND Reference: Offset Datum Reference Plan#7-srvy permutations 02-15B Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 5,788.76 to 11,739.86ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,369.29ft Error Surface: Elliptical Conic Survey Tool Program Date 5/23/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 113,76 5,788.76 02-15 Srvy 2 GYD-CT-CMS(02-15) GYD-CT-CMS Gyrodata cont.casing m/s 5,788.76 5,800.00 Plan#7-srvy permutations 02-15B(Plan 0 CB-GYRO-MS Camera based gyro multishot 5,800.00 6,100.00 Plan#7-srvy permutations 02-15B(Plan 0 INC+TREND Inclinometer+known azi trend 6,100.00 7,600.00 Plan#7-srvy permutations 02-15B(Plan 0 MWD MWD-Standard 6,100.00 8,966.00 Plan#7-srvy permutations 02-15B(Plan 0 MWD+IFR+MS MWD+IFR+Multi Station 5,800.00 6,100.00 Plan#7-srvy permutations 02-15B(Plan 0 GYD-GC-MS Gyrodata gyrocompassing m/s 8,966.00 10,450.00 Plan#7-srvy permutations 02-158(Plan 0 MWD MWD-Standard 8,966.00 11,739.86 Plan#7-srvy permutations 02-15B(Plan 0 MWD+IFR MWD+ IFR correction 5/23/2012 9:58:59AM Page 2 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-15 Project: Prudhoe Bay TVD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Reference Site: PB DS 02 MD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-15 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-15B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#7-srvy permutations 02-15B Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-05-02-05-02-05 6,812.68 7,400.00 331.99 230.95 108.47 Pass-Major Risk 02-05-02-05A-02-05A 6,812.68 7,400.00 331.99 230.95 108.47 Pass-Major Risk 02-05-02-05A-Plan#9 6,812.68 7,400.00 331.99 231.05 108.36 Pass-Major Risk 02-05-02-05APB1 -02-05APB1 6,812.68 7,400.00 331.99 230.95 108.47 Pass-Major Risk 02-08-02-08-02-08 6,444.78 6,525.00 921.95 343.56 634.75 Pass-Major Risk 02-08-02-08A-02-08A 6,424.76 6,500.00 919.16 343.25 634.75 Pass-Major Risk 02-08-02-08APB1 -02-08APB1 6,424.76 6,500.00 919.16 343.25 634.75 Pass-Major Risk 02-08-02-088-02-088 6,444.82 6,525.00 921.95 343.56 634.75 Pass-Major Risk 02-10-02-10B-02-1 OB 9,611.35 11,300.00 343.38 215.51 130.26 Pass-Major Risk 02-12-02-12-02-12 Out of range 02-12-02-12A-02-12A Out of range 02-12-02-12APB1 -02-12APB1 Out of range 02-12-02-12B-02-12B Out of range 02-12-02-12C-02-12C Out of range 02-13-02-13-02-13 Out of range 02-13-02-13A-02-13A Out of range 02-13-02-13B-02-13B Out of range 02-13-Plan 02-13C TEST-Plan#8 02-13C Out of range 02-14-02-14-02-14 6,130.36 6,175.00 456.17 242.91 218.23 Pass-Major Risk 02-14-02-14A-02-14A 9,650.00 10,200.00 243.12 131.38 122.81 Pass-Major Risk 02-15-02-15-02-15 5,988.43 5,975.00 8.30 114.46 -90.04 FAIL-Major Risk 02-15-02-15A-02-15A 5,988.43 5,975.00 8.30 114.46 -90.04 FAIL-Major Risk 02-15-02-15APB1 -02-15APB1 5,988.43 5,975.00 8.30 114.46 -90.04 FAIL-Major Risk 02-15-Plan 02-158-Plan#7 02-15B 7,247.91 7,275.00 41.84 111.41 -69.57 FAIL-Major Risk 02-16-02-16-02-16 Out of range 02-16-02-16A-02-16A Out of range 02-16-02-16B-02-16B Out of range 02-16-02-16C-02-16C Out of range 02-16-02-16CPB1 -02-16CPB1 Out of range 02-17-02-17-02-17 Out of range 02-17-02-17A-02-17A Out of range 02-17-02-17B-02-17B Out of range 02-18-02-18-02-18 Out of range 02-18-02-18A-02-18A Out of range 02-18-02-18APB1 -02-18APB1 Out of range 02-18-02-18APB2-02-18APB2 Out of range 02-18-02-18APB3-02-18APB3 Out of range 02-18-02-18B-02-18B Out of range 02-18-02-18BPB1 -02-18BPB1 Out of range 02-26-02-26B-02-26B 11,730.49 12,525.00 1,264.30 842.94 422.04 Pass-Major Risk 02-26-02-26B-02-266 Wp 02 11,734.53 12,375.00 1,304.21 843.46 461.40 Pass-Major Risk 02-27-02-27-02-27 7,277.10 7,250.00 543.27 193.85 354.80 Pass-Major Risk 02-27-02-27A-02-27A 7,277.10 7,250.00 543.27 193.85 354.80 Pass-Major Risk 02-28-02-28-02-28 6,302.32 6,300.00 1,243.46 226.15 1,043.63 Pass-Major Risk 02-28-02-28A-02-28A 6,302.32 6.300.00 1,243.46 226.18 1,043.61 Pass-Major Risk 02-28-02-28APB1 -02-28APB1 6,302.32 6,300.00 1,243.46 226.15 1,043.63 Pass-Major Risk 02-28-02-28APB1 -Plan#13 6,302.32 6,300.00 1,243.46 226.18 1,043.61 Pass-Major Risk 02-32-02-32-02-32 Out of range 02-32-02-32A-02-32A Out of range 02-32-02-32APB1 -02-32APB1 Out of range 02-32-02-32APB2-02-32APB2 Out of range 02-32-02-32APB3-02-32APB3 Out of range 02-32-02-32B-02-32B Out of range 5/23/2012 9:58:59AM Page 3 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-15 Project: Prudhoe Bay TVD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Reference Site: PB DS 02 MD Reference: 02-15B plan P273 @ 77.76ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-15 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-15B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan#7-srvy permutations 02-15B Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-32-02-32B-2-32B WP04 Out of range 02-33-02-33-02-33 Out of range 02-33-02-33A-02-33A Out of range 02-33-02-33B-02-33B 5,829.66 6,200.00 1,073.80 92.20 983.44 Pass-Major Risk 02 35 02 35 02 35 Out of range 02-35-02-35A-02-35A Out of range 02-35-02-35B-02-35B Out of range PB DS 07 07-34-07-34A-07-34A 11,413.52 12,924.00 346.07 273.53 76.54 Pass-Major Risk 5/23/2012 9:58:59AM Page 4 of 5 COMPASS 2003.16 Build 73 Project: Prudhoe Bay Site: PB DS 02 From Colour To MD Well: 02-15 Wellbore: Plan 02-15B Design: Plan #7 02-15B 5789 5800 5800 6300 6300 7000 7000 7500 From sidetrack pt to TD 7500 8000 Scan interval 25 ft 8000 9000 Scale 1 : 50 9000 10000 02-15 motherbore shown at no errors 0 10000 10500 10500 11000 1► '� �di 11000 11740 330 i, .. .01111► -='---itqr-Z*-2110.1014111A016 11111100. �` 300 ----- 60 � / /� / / / / i / ' / 6� / / / / f/ / i - / / / / / /% / fill ( 1 i / / I 1 ' ill/ t 270 90 cn¢61- - 02-15/02-15APB1 51 240 j�"for •-I20 / Air‘fv4P, 125 , �/, �/4s/ 150 i 00111111 210 //,ll0 ' 150 175 Aill -- 180 Travelling Cylinder Azimuth (TFO+AZI)[O]vs Centre to Centre Separation [50 ft/in] > 11 LT 4�-� ,, .-'-7• ,..,..a.;.-_,.4.4.._,:. ` , �,+ 4•/!. 4..: --;, WELL No. 13 T,"-`:5-3"y at 0 k ^ LAT. td°!6\ I0.722 ,,,,.':•- 5 950 516 .02 t i., Z, � ''; LONG_ 148°28'57,442•._ s 687 61689 u,��.• . ' WLELL `No. li{ " ';,..:-5.95,- � � AT 70016 I 4`qd633 S4 '`..a"•" -35 36 �,e;+,' -;,3 L0+, _ _ LONG 148°28158 QsB ++687 592 OO SVa 74. },rte• .4'1r= -. :*;3 • - WELL _1No, I'.� , ='f .x•;' ":',: ,if'"1 • k ` .' `y; , ";. t LAT. -i 7d°F6� 13039 ," t' ,415.950750.39 . „' c a t-. .,t: < + } LONG,.-04413•281,59,7301`;';--T r;5687 566.81 .. 1 r 16� s .. WELL No. !6•, .• ` - . ' 4. . -..-'''...,4,.....-• ^*K • 80 1 ' 1 - _ LAT. - 70°16 14 199 7 'Pi. �.t � t• �,{�,: .� _ ti- r � '3�4Sd8b7. 4�,,' x „-:( titt - LONG 448°281 S9 359- `”687 542,26 •• 7-- .`', _ ktk. C+.' 5%, •-',7—1, L. .5 `, ` •f:. .f 'fit �}.•� Wry,3 .l- , i 4=.-` ••!...,_ ' •. ._ •. •,te e+ . likr a I3 .v f;,,` `. ,.. 873-4-0 _ f. ° ' • '" 1 w ..r _ • ,r 4 .+aM • 1y � - ya4 I ri.1,476..4A• wY IY�.'_`i.• � }IV . �ys -J. 'Y,'A.( ,� •% t 1 , • r . rt_coM tom, • rti • ,J a ; •• V _. . , - . -. .. QL s r d 0 EXISTING WELL OR CONDUCTOR PIPE ' 35 36 j _ _ ' T. II N., R.14E- - - - __ .._ . U,►1_ :-FiE4ASION DATE CKD -! HEREBY- CERTIFY THAT 1 AM PROPERLY REGISTERED AND LICENSED TO AR CO N o. - - PRACTICE LAND SURVEYING 7N THE STATE OF ALASKA AND THAT THIS 1 PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY ATLANTIC RICHFIELD CO. SUPERVISION, AND ALL DIMENSIONS AND OTHER DETAILS APE CORRECT AS BUILT MAY 14,1979 - -H.PAUL CAMPBELL ......`e'cc,. ��.. 4 WI - DRILL SITE No.2 DATE OF SURVEY SURVEYOR r'�P' '••.."÷,1 'WEST PAD __,.....z..,..-.2.7.-......._ ` -_ --- -- - �- ' .. •A• . '? _ - WELLS No.l3thru 16 - - -- +. ~• 0 � `4 t* l LOCATED IN PROTRACTED ,,�, ,-s• ,••••••••••••••••••+`__ SECTIONS 258 36 T.11 N. R.14 £- U.i.;, ` _T.17...7‘-::. .. .gyp . •�i '' -..1. f '_ e:• , _ 1 1 1 oir'}"_ _. ♦�`�wwM•wiaZ�.�.••N1Mr�, PREPARED BY • -" .t1 r, :•ce►at.,1 •:,.1 ' HEWITT V. LOUNSBURY a AS SOC_ — v --.--,t:4� *y .r ti•• (5.41b; o:'T gir 723 W. 6� AVE , ANCHORAGE, ALASKA.. ', �. • i ,• ';.- ;% .1104FfK �`'' 4.411. DATE MAY 2'1. 1979 SCALE 1�_ 200 <<11%.112= a\' 1. CHKO 8Y t4 PL FIELD 8K LOOSE LEAF _ I O -MI- - - . I NOTE: 1.11 a — ft1 1. DATE OF SURVEY: SEPTEMBER 16, 2011. T� I • - ���1"�� mit IIS 2. FIELD BOOK: NS11-71 PGS. 47-52. :;; � 3. VERTICAL DATUM IS BP MLLW, MEAN LOWER LOW WATER. 10\l! 4. VERTICAL BENCHMARK PB071971, ELEVATION = 33.37' • + 01 WI ` Tz IP\ ___4\ ,....._... ............--4., ii,i; V—__ ____ DS2 gill 410) 1 VICINITY MAP NTS Air am ELEVATION: 35.44' ,-- . . . /4-I I '—I IA I , ! I,.' tir . .,,, ,,„,, . ‘,_-- r _1_, . - . _ _ _ _ . - - .�; . it ELEVATION: 32.98' ,i, 1`;‘,V rL., secr.r rCot n Y -4. '`, a` � { •rr( rr( ( *e 'h , ELEVATION: 30.81' 'rrCre600 !!°' ' CrfCrf,r006* ( C 000006 $ 44 4 C. F. Robert _ , DRAWN: MJW bp0 !<-` CHECKED CSS hN Il r DRAWING Si 1 00 •- JOB NO: EOA DRILL SITE 2 SHEET: assoc. WELL 15 00 9/17/11 ISSUED FOR INFORMATION NJW CSS av SCALE: OF 1 SO I MST nrencro v. NTS HEAD ELEVATIONS NO. DATE REVISION BY CHIT MEM.. PM. mai Page 1 of 2 Schwartz, Guy L (DOA) From: Rose, John G (ASRC) [John.G.Rose@bp.com] Sent: Friday, June 08, 2012 12:39 PM To: Schwartz, Guy L (DOA) Subject: RE: DS 02-15B ( PTD 212-075) Attachments: GPB Ivishak BOD.ZIP answers. 1. According to the our PP/FG work done for DS-02, the most likely PP from the top of the Sag to TD (which includes the Shublik) is 7 2 ppg and therefore, drilling this section of the well with our standard 8 5- 8.9 ppg drill-in reservoir fluid will provide a sufficient over-balanced condition for safe drilling operations. The maximum PP of 9 9 ppg for the Shublik as indicated in our request for the PTD, is a calculated value for this"shale"which has no flow potential and therefore, should not be considered a drilling hazard. 2. The casing design work for this well is covered under our Base of Design document for our USH Ivishak wells (see attached). If you have any additional questions or concerns, please advise. -jr John G Rose BP Staff Engineer Anchorage,AK rose11@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Friday, June 08, 2012 11:45 AM To: Rose, John G (ASRC) Subject: RE: DS 02-15B ( PTD 212-075) Couple more questions came up... 1)the Shublik is over pressured compared to Sag... When you drill into the Shublik after setting 7" are there any concerns or is formation so tight that it doesn't raise concerns with mud weight? 2) Do you have Burst , Tension , and collapse calculations for casing. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose, John G (ASRC) [mailto:John.G.Rose@bp.com] 6/11/2012 Page 2 of 2 Sent: Friday, June 08, 2012 8:04 AM To: Schwartz, Guy L (DOA) Subject: RE: DS 02-15B ( PTD 212-075) Let me know if you need additional info on this wellhead system. -jr John G.Rose BP Staff Engineer Anchorage,AK rose11@bp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Thursday, June 07, 2012 2:54 PM To: Rose, John G (ASRC) Subject: DS 02-15B ( PTD 212-075) John, Can you supply a vendor drawing of the new Cameron Wellhead... Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 6/11/2012 02-15B Page 1 of 1 Schwartz, Guy L (DOA) From: Rose, John G (ASRC) [John.G.Rose@bp.com] Sent: Friday, June 08, 2012 12:39 PM To: Schwartz, Guy L (DOA) Subject: 02-15B 242- _tT? C Guy, As it relates to our conversation this morning as to the final condition of the existing 20"and 13-3/8" casing stubs after removing the old wellhead, please note the following plan as it is currently detailed in the"draft"wellplan: 1. To remove the old wellhead, set back the BOP and make internal WACHS cut on the 13-3/8" casing below the hanger and remove the 13-3/8" casing hanger and wellhead from above that cut. With the wellhead removed, make an external cut on the 20" below the lower most casing head and remove same (will/may require some excavation / plug the 13-3/8" casing looking up with absorbent wrapped in wire to prevent debris from falling down-hole). With the 20" removed from above the cut, cut-off the excess 13-3/8" casing above the 20" stub leaving both casing stubs at basically the same level and fill any 20"x 13-3/8" void with cement. If you have any questions and/or concerns, please advise. -jr John G Rose BP Staff Engineer Anchorage,AK rosel l@bp corn 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home 6/11/2012 Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Thursday, June 07, 2012 1:58 PM To: 'Rose, John G (ASRC)' Cc: Regg, James B (DOA) Subject: DS 02-15B (PTD 212-075)and Parker 273 John, Can you supply a better diagram of the new BOP for Parker 273?We don't have a separate BOP file here at the Commission for this rig yet. If you can supply the detailed drawings for the diverter/BOP/choke manifold etc. we can file it. We do have several emailed documents but they are quite old and may not be up to date to reflect any changes to the rig since then. Will this be the first well for the rig? Your drilling schedule indicates in will be number 2 for the rig afer DS 02- 12.... if so the BOP testing cycle may be at 7 days till the rig has several BOP tests under belt and is running smoothly. Below is a generalized requirement for new rigs working in Alaska. ... this of course applies to Parker 272 also. AOGCC requires details about rig and will need to do a thorough rig inspection prior to it being put in service for BP. I'll give you the benefit of learnings from AOGCC"s review and inspection of other recent rigs new-to-Alaska over the past 5 years: - Design and fire rating for BOPE control lines; - Protection of critical well control systems from freezing (e.g., BOPE hydraulic control lines); - Pressure rating for equipment; - Exposed degasser and piping that would be susceptible to freezing; high potential for plugs to form; - Insufficient#of accumulator pumps; regulations require 2 or more pumps with independent primary and secondary power sources; - Gas detection, mud handling, rig watch (pit volume totalizer) equipment; often not rigged up when AOGCC does initial rig inspection; typically run into problems with personnel on rig not familiar with equipment;gas detection system must incorporate separate and distinct audible and visual alarms are required for combustible gas and H2S; there is a non-regulatory standard for visual alarms that has evolved in Alaska (combustible/methane—red light; H2S—yellow light); - Nitrogen backup for accumulator; - Firewall to shield accumulator and primary BOPE controls; - Choke and kill lines assembled with improper connections(hammer unions are not allowed); - Diverter system, including annular preventer, vent line configuration/orientation, knife valve, vent line size and distance from closest ignition source. Other items: - Certifications for all BOPE (rams, annular,valves, high pressure piping, controls) and copies of test charts done during certification inspection/testing by qualified 3rd party; - Documentation from most recent major inspection of BOP stack and related components per API RP 53, Section 17.10.3; 6/7/2012 Page 2 of 2 - Well control certifications for Toolpusher, driller and others who participate in drilling and workover operations; - Pressure testing procedure for BOPE; procedure for using Nitrogen backup; - If modifications to the high pressure piping system, provide information confirming welding has been done by qualified welders/pipefitters and include report documenting non-destructive testing; opportunity must be provided to AOGCC to witness pressure testing (commissioning of modified high pressure piping) - If the BOPE stack is incorporating a set of blind-shear rams, include actual shear testing data and photos of cut pipe; reference API RP 53, Sections 12.3.2, 17.5.6(blind-shear rams not required for surface stacks, but several operators have transitioned to including blind-shear ram in their BOP stack) Feel free to contact me if you have questions. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 6/7/2012 (1) CI) Q � (00 0 - aOcn W - -n5 —, —I 00-6 - —I v a O 6, D D c m -a z r c la Fri -- c a) wZ �) c �- nNW - a nw ola cn O 2 v x D O N D • _. CD FP CD N co cn cn to m6 _0 - X - O •(D < N � N - Z ' = n a Zi)" N Co v v O O) N ` TIm v 3 lD 0- = 5 0 v a� W ° m � y rn ( - m 0) o O N N O Co W N .JN. D O N O Co3 W 01 .--.- Op J Q r2 iD O lD • < tQ A O `� v N oo — - CO - 4 = A O x CD CD ,v 'a CO M wN S CD -a O 0 0 CA) 01 -' 6-1 u) c o_ (D Z3 -i Q' -6 -< 626 Co-o cD O Q 1.) v PC,G CO 01 a Oo CDa) co 45 - ! -I cn -s. v cD O cn O CD 5 O 0O-n W J'�•,. 6 • O O(L] 1\3 CT -",--V �yt. • CIi (D ea O7 — 4\- "IP () 00cn a >-a . , r- 0 0 0 Wer \ g., /1 oo 0:20 _ V/ ,.; �" r, lir ...., ._„, (-4., ,. 1...: , ,....... ,,, ...., -,!_._,..w .....„--0. , _ , 7f ats: ., ,‘ ii:_i. - i., :,..1. „....) f_____________u,/ .ir.:1,11.:_,_..i.....„\A {1,t ...PI , , 1Lcir 1 I ‘ ,tr:(5) 1 ... ,� * ' -- fit. , i . ((. '''',•-• ' ' I . . , . . .„. e+ ‘NN\ ..,_. ,, { • .1 i, il ' 4 • I . r r .1 4.--.1 1 I 1, I ,/.., 1 .11 H ' t ..-7..,4`,, n 1 i 'i'l ;--,I f ,, '',, hk,. t,--,1 4 . SO , I ' ig ll Oil ti,3 L. fir: ( :. n---. s: T Q i .i�. tf T.) —1 `. � cn cn Q\ 144/ ' � Nz � � co . Z = Z iD re-97 i -aO -aNc 0 . 0Yi is NN N p �:•, \ - n -irn -0 5 o � � aCO � Ac� �� ai O _Y_, o .�, oW co -o � oC _CC N . . b O 1•3 CO o `-'1 CCD Ill o Oz D ,�= v DQo D :yr.:, co r- + �' c Wino CD CI _ CA v _ � gcn ao W W cD y m N tU D J c Co v in -0 v � 3 (-) z - CI, '� W cD = oj cD Nz. 0 c) = W ON m T- W 2 - cc cD x « -0 — -++ ,< v Z < 1 O ---I (D nO N Xv v - 5 up 0 A ? CAMERON Obp Alaska Housing 11" 5M x 9-5/8" Slip-Lock with Canh Seals 11" 5M iililiNillllNli 8X Studs/Nuts 9-5/8" Casing C5166 DWI 9M1Orv]D IND II g2 = x „ 1 . o 2 g� jN A Ln-I.NoouLc m 0 nD - . ? - -- ---__.---- ; s UTILITY MODULE MUD MODULE CRILL MODULE z DRILL MODULE ORIEL MODULE r�x r -I E,„va �\ v n u � aw-fila IA F. HMThf I j � xu Tg>s3 s N = N AX 7 g j -o-. +ao HN oal �c _ all l ally- MH-o62E__ e 3= I R 0 3= gg A, g w LI o A A A. a � m m i ,. i A. ' 5--141-1-162:-HRT��- {k d 1115 !Ilgps'fiT l P" 10;.,—_, ryn r ',j1 P-I fP 1IMI,--- Iu`"I- �' ( _ C ' xes"ms . T IC �l � "' II pp ,� I-; o � Km 141 1 71 1 �x3s -i ti IT a 1,3-5 i cB 3= 5Qo' co n - 99 i 0 0 o = P z.-till ni I 2Z4 1. 3 x j 1>r°1>> 11>>1>1>!� o A, I a E , a Elli T• •1!.§-Tiotg% _ I� 1 -'a sg-: I - Fga `'! > �� 1 s `a' aL. r y�g R III I 2- 4— , m o g r __v. u c. - v —,,----,,,,c DRIII MODULE t,G x MUD MODULE «,o ry I I .rT' ;_n ,;1a4mz "2 LA5R7 I I A, g ^ g s I>au>a e.,''an ; ' I u B X `, - A. ,'''o 6n it�� ; IFC-Hr .-11--IIDci,F i U--1 HFLUDCIH�3'Y '161] . tO Pnr.IC LIN: ) \ ` 23 177 I Y EV -I =E A A '�DRILL D MODUL RILL MOCJLC -� ` 1 O z 7, a - L C ae^,.a> o g N Q - v --. ��v sc Y ' gF S OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME ,4 a 62./S5 PTD# - /2 77c Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: g-td-c/Lothe---- POOL: ii-2-bccJ1i-rs-e— S:2 / Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name)must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 H ii TO N 0) O a) a)0 0 U m a 0 N O (0 O a a) C U Q O a 0) c • •N m o E W O) Qto d a) ^ O V C 7 N -0 m O O (4 C 0 (n _ O W — 0O m o r .3 n L. 3 mCD a) m oui m 0 x° '0 c U g c Z a - c _ a) O p 4 ° U O u) 0 O U N d R O y E u! "O co a- a) a) a) O m _ 0 0 U o 1.0 O(0v .) 'as t o =-' m ci a ` T 30 w 0 N = a 0 O, Q 0 u) 0 0 3 w > a) c ca' to t @ c a 0 c y m'. > O t a c n N 0 N N � a .(7) U an 0 u) 0 w O N E 2En C O N CO a)0 7 "O Q t� E U) N as = Z (O O — Co DO O • N co N = N C O In co °- - — O n Q 00 O - CO CD O 0 0 O •Z _0 N 0 C • C C 0) CO No w m CO°r m -o = n CO In N ' a CO 'o A- 0 I` p O O p I a) c a) ` c 3 CO `o n• r°)) �_ ac) (i) C °' if) = Q p a) Q E -O — 'O O �� — CO = T O p = O ° c a) a) a) m D W L a a) (0 O >, m N Q 0 ° N m a) E W a 0 a@i 3 >; m o w c a0i w a r m `0a Q 0) af o N (I ( Q 0 Q a)- a ° 0 0) co a Q m m a c 0' 0) ai o a° w > �' 'uci 3 c C E o 0 3 0 0 C m C7 3 O p a ° o ° rn N �_ E co 0_ a) ami a) a U . a) c Z a) p m c a) =° °� 77 0.N r w E _ O d o cn E u) 0 a)) Q ._ D to C M 7 U O) < O NN @ co N = N o m LU W a O L-• o U - - N- Q d d > 2 I 0 C d -Op a (, w c p o cc Q Q aa)) a a), a aa)) CO aa. 0 0 a aN) a, aa. Q Q Q Q Q. Q o a) a a) a) o Q CI) aN) a CI) aa)) aa)) Q, o, aa)) Q Q, Q. azz >- >- >- r >- >- rr >- rrrzzz zzzz >- >- >- >- ZZrrr >- rrz z >- zz, z t\Si T ~ O in- an v _ p O\...%4 N (9 U _ T o To c E • E 3 - E a) O U C N a) o LL T r. oto. )1 , , 4 C 0 .1 O ° N C 3 0 (O O a) M ul a) >. U C C O a) L @ J p^ o 'Z .O. CD a) O Q O O (n N 0 O` O O O 0 _O N 'O (a O U Q Q 0 J c O C v N j U LL N N N p O > C O O) O Q O N N N N D Q a n aci a) °) '7 a) (,) a) o p Q. .. cn O -0 w U otf N "Fa a) (p .N '~ Ci o c a) E o 30 It -0 m 0 Q O C N C 0 .O co T .L..• _ n p "=O O o xs E a-°) l0 4 M a (:) ..-- O N m U o = C o) Q Z N m D ° (/) c 0) t c (0 Q ° Q of uNi a a) rn Lu - -`o o C -0 o a) 'c 'o as m o. p o C a) CO o O o)) a) r a) c a) co CO '> 0 > o Q a 0 c c o o, ° 0)a) O Q CO E E = -o c c E @ a) o c c in c o _ us D c 0 _ N r Q c c U C V) i Y Q o o `o v •° 0 7 C o o 0 ° o) 3 0 n a ° 0 •- 0 . a 2 a 3 0 > m Y m.N D co o .n —°o a) a) - c T o a m Y m o 0 0 0 n) g id o@ Q m Q n o m o a) c u cc J0 0 0 a o 0 a) c — 2 0 - E 3 0 0 a) -C m 3 a) E Q Q E o E 'a N (C6 0 a d o L L -0 0 O M O C C- w u) M @ an a)) 0 0 o n 3 0 '� o T 3 m E TD z N 0 0 m 3 3 a) aa) a) .. a N '( a: 3 m 22 o a a) U a .� u) 0 3 m a) o w o 0 .`Q 'O C .> .- > 'j U o O V O O U n O. 7 O 0 Z U a0 O C 0 c ' "0 "0 > o d .Q 13 8 O E o ° a) O 0 c o- 0) -O a) O 2 CO C -O n V) 0 a) F 0 o n (0 a) m a 0 0 a) oY a) o E a) E o a) o c Q U L n a) d d O O Q 0 N Q 1E V 0 °' .o. :i — o N c, E coo ._ N w (3 0 0 C L -° Ct u) U O E O O O N a) @ n u) N N ,- ,E co Q 7 7 O N m .fl O T a 3 = C •N N O E• O O O a -0 -0 -0 U .N T N a a a -0 L 0 u) •- 0 0 > o) C ° a)- D' 0- -c N O O O 00 _ T a) a c E a) a) m m o t c c ._ a) (_) @ 0 0 0 'N �° — 3 ° 0 w c o m c aci c o (U H w > .9 0 3 o is iv c m 3 ( E (6 3 a o 0@ (a — o0 0 = 0 a) ° m — C 0 (a 0 (a 0 c c c U o 0 0 0 0 n 0 0 0 0 m a m Q E a) •c 0 E 0 CO 0' 0 0 o a) o ° o ° 0 U > > 3 m 0 0 ) rn ° 0 3 m co .. Q - YCO o aa`� 2 '6 a) 5 m -0o a 0- 4 m a) 3 m o a 2 2 2 m -oo O -cp °)o c O O _c ° n a0) m o -a a) o CO V' c z a J D 5. cn ' O O a a U 5 ¢ a` U co U U U U Q Q o m m U 5 N 2 a p co co U W °Z E ' ,— N co V t0 (O I-- 00 coO N CO V t) (D CO O0) O N N CO V toN O h CO N O CO MN CO V «M) CO IM� CO COO (� U F-- N N N ' N O a+ 0a) 0 C .° 0 C f0 N jp N f0 NV O E-. r 0 p . p CO p ,_ 0 (cn W' O R (O C (0 (0 . Cl.. ff ,_ w --I N N N a) 0 O C - O J" #k `p p 0. (n p p 0