Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-076
Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 DATA SUBMITTAL COMPLIANCE REPORT 3/7/2017 Permit to Drill 2120760 Well Name/No. PRUDHOE BAY UNIT Z-69 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23471-00-00 MD 11021 TVD 9196 Completion Date 11/12/2012 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION / Mud Log No✓ Samples No Directional Survey Yes V/ DATA INFORMATION Types Electric or Other Logs Run: MWD / GR / RES, MWD / GR / RES / NEU / DEN, USIT / CBL, MWD / (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 22038 Digital Data 11/20/2012 Electronic File: T22038 USIT_MSIP_08-OCT- 2012_F I NAL. pdf ED C 22040 Digital Data 11/20/2012 Electronic File: T22040 SONIC_SCANNER_06- OCT-2012_FINAL.pdf ED C 22120 Digital Data 1/8/2013 Electronic File: T22120 USIT_MSIP_08-OCT-a 2012_REV1.pdf ED C 22867 Digital Data 1/3/2013 Electronic File: Z-69 ASP Final Survey.pdf - ED C 22867 Digital Data 1/3/2013 Electronic File: Z-69 Final Survey Points.csv ' ED C 22867 Digital Data 1/3/2013 Electronic File: Z-69 Final Survey Points.txt ED C 28032 Digital Data 120 11021 3/6/2017 Electronic Data Set, Filename: Z-69 Composite , Drilling Mechanics Depth Data.las ED C 28032 Digital Data 570 11021 3/6/2017 Electronic Data Set, Filename: Z-69 VISION Service Memory Drilling Data.las ED C 28032 Digital Data 680 11021 3/6/2017 Electronic Data Set, Filename: Z-69 VISION Service Real Time Drilling Data.las ED C 28032 Digital Data 41170 41172 3/6/2017 Electronic Data Set, Filename: Z-69 Drilling ' Mechanics Time Data 12.25-1.1as ED C 28032 Digital Data 41183 41188 3/6/2017 Electronic Data Set, Filename: Z-69 Drilling Mechanics Time Data 6.125-5.las ED C 28032 Digital Data 41174 41179 3/6/2017 Electronic Data Set, Filename: Z-69 Drilling . Mechanics Time Data 8.75-2.1as ED C 28032 Digital Data 41178 41179 3/6/2017 Electronic Data Set, Filename: Z-69 Drilling , Mechanics Time Data 8.75-3.1as ED C 28032 Digital Data 41179 41182 3/6/2017 Electronic Data Set, Filename: Z-69 Drilling , Mechanics Time Data 8.75-4.1as AOGCC Page l of 4 Tuesday, March 07, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/7/2017 Permit to Drill 2120760 Well Name/No. PRUDHOE BAY UNIT Z-69 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23471-00-00 MD 11021 TVD 9196 Completion Date 11/12/2012 Completion Status 1-0I1- Current Status 1-0I1- UIC No ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 EOW Letter.doc ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Resistivity 12.25- , LWD001 Recorded Mode Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Resistivity 12.25- - LWD001 Recorded Mode Data.html ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 6.125- - LWD005 Recorded mode Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 6.125- 1 LWD005 Recorded mode Data.html ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75 , LWD004 Recorded Mode Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75 ' LWD004 Recorded Mode Data.html ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75-' LWD002 Recorded Mode Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75- LWD002 Recorded Mode Data.html ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75- , LWD003 Recorded Mode Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 8.75- , LWD003 Recorded Mode Data.htmi ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service Real Time - Composite Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service Recorded , Mode Composite Data.dlis ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service Recorded Mode Composite Data.html ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 Calculated ECD Data 8 751nch Hole.xls ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69_ MudResistivityReport.xls ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 Composite Drilling 1 Mechanics Depth Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 2 Inch MD ' P Recorded Mode Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 2 Inch f2 TVDSS Recorded Mode.PDF AOGCC Page 2 of 4 Tuesday, March 07, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/7/2017 Permit to Drill 2120760 Well Name/No. PRUDHOE BAY UNIT Z-69 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23471-00-00 MD 11021 TVD 9196 Completion Date 11/12/2012 Completion Status 1-0I1- Current Status 1-0I1- UIC No ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 5 Inch MD Recorded Mode Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 5 Inch TVDSS Recorded Mode Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service Quadrant P Density 5 Inch MD Recorded Mode Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 2 Inch MD , Real Time Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 5 Inch MD Real Time Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 VISION Service 5 Inch ' TVDSS Real Time Log.PDF ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 12.25 Drilling Mechanics Time Log 1.pdf ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 6.125 Drilling Mechanics Time Log 5.pdf ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 8.75 Drilling Mechanics , Time Log 2.pdf ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 8.75 Drilling Mechanics Time Log 3.pdf ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 8.75 Drilling Mechanics . Time Log 4.pdf ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 ASP Final Survey.pdf , ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 Final Survey Points.csv ED C 28032 Digital Data 3/6/2017 Electronic File: Z-69 Final Survey Points.txt Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED AOGCC Page 3 of4 Tuesday, March 07, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/7/2017 Permit to Drill 2120760 Well Name/No. PRUDHOE BAY UNIT Z-69 Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-23471-00-00 MD 11021 TVD 9196 Completion Date 11/12/2012 Completion Status 1 -OIL Current Status 1-0I1- UIC No Completion Report Y Directional / Inclination Data Mud Logs, Image Files, Digital Data Y NA Core Chips YgNAProduction Test Informatio Y NA Mechanical Integrity Test Information Y N Composite Logs, Image, Data Files Y Core Photographs YGeologic Markers/Tops Y Daily Operations Summary y Cuttings Samples Y NALaboratory Analyses Y COMPLIANCE HISTORY Completion Date: 11/12/2012 Release Date: Description Date Comments: Co Comments Date: ` AOGCC Page 4 of 4 Tuesday, March 07, 2017 by Date: 03/06/2017 Transmittal Number: 93541 to -1 RECEIVED BPXA WELL DATA TRANSMITTAL Wi 0 6 2017 Enclosed are the materials listed below. AOGCC If you have any questions, please contact Merion Kendall at the PDC: 907-564-5216; merion.kendall@bp.com; gancpdc@bp.com or Joe Lastufka 564-4091. SW Name API Date Description _Company • GR-RES-NEU-DEN Log Prints -MD • GR -RES -NEW -DEN Log Prints-TVDSS • QUAD DEN Log Print -MD • DEF SURVEY Report -Paper copy Z-69 500292347100 10/5/2012 BPXA • CD containing digital log data & survey 11-\A 2 71��4 '341�(a Please Sign and ReftKn one copy of this transmittal to gancp�c)bp.com Thank You, Alerion Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Meredith Guhl 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99507 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 by 0 Schlumberger Z-69 ASP Final Survey Report (Def Survey) Report Date: October 05, 2012 - 10:30 AM Survey / DLS Computation: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 9.519 " (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure / Slot: Z -PAD / Z-69 (NJ) TVD Reference Datum: Rotary Table Well: Z-69 TVD Reference Elevation: 96.110 ft above MSL Borehole: Z-69 Seabed / Ground Elevation: 56.100 ft above MSL API#: 50-029-23471-00 Magnetic Declination: 20.552 ° Survey Name: Z-69 Total Gravity Field Strength: 1002.6731 mgn (9.8 based) Survey Date: October 04, 2012 Total Magnetic Field Strength: 57618.010 nT Tort / AHD I DDI / ERD Ratio: 207.616 ° / 5199.443 It / 6.112 / 0.565 Magnetic Dip Angle: 80.965 ° Coordinate Reference System: NAD27 Alaska State Plane, Zone 04, US Feet Declination Date: October 01, 2012 Location Lat I Long: N 70° 17'52.98812", W 149° 11' 24.51079" Magnetic Declination Model: BGGM 2012 Location Grid N/E Y/X: N 5959239.940 HUS, E 600003.450 ftUS North Reference: True North CRS Grid Convergence Angle: 0.7625o Grid Convergence Used: 0.0000 ° Grid Scale Factor: 0.99991136 Total Corr Mag North ->True North: 20.5522o 122.00 0.48 Local Coord Referenced To: Well Head Z 12--0�� 2 (2)c Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude _ (ft) RTE (°I (°1 (ft) (ftl (ft) Ift) (ft) (ft) ft (/100ft) (flus) (ftus) (1 1 1 0.00 0.00 0.00 -96.11 0.00 0.00 0.00 0.00 0.00 0.00 N/A 5959239.94 600003.45 70.29805226 -149.19014189 40.01 0.00 0.00 -56.10 40.01 0.00 0.00 0.00 0.00 0.00 0.00 5959239.94 600003.45 70.29805226 -149.19014189 122.00 0.48 343.00 25.89 122.00 0.31 0.34 0.34 0.33 -0.10 0.59 5959240.27 600003.35 70.29805315 -149.19014270 176.00 0.21 321.72 79.89 176.00 0.58 - 0.67 0.66 0.62 -0.23 0.55 5959240.56 600003.21 70.29805396 -149.19014373 269.00 0.49 198.51 172.89 269.00 0.30 1.08 0.60 0.38 -0.46 0.68 5959240.31 600002.99 70.29805329 -149.19014561 361.00 0.79 136.25 264.88 360.99 -0.47 2.01 0.48 -0.45 -0.15 0.77 5959239.49 600003.31 70.29805102 -149.19014307 454.00 1.26 143.82 357.87 453.98 -1.57 3.67 1.96 -1.74 0.90 0.52 5959238.21 600004.37 70.29804750 -149.19013459 547.00 1.85 140.06 450.83 546.94 -3.26 6.20 4.46 -3.72 2.47 0.64 5959236.26 600005.97 70.29804210 -149.19012190 610.00 2.04 146.84 513.80 609.91 -4.74 8.33 6.59 -5.44 3.73 0.47 5959234.56 600007.26 70.29803741 -149.19011165 677.00 3.16 154.86 580.73 676.84 -7.14 11.37 9.61 -8.11 5.17 1.75 5959231.90 600008.73 70.29803011 -149.19010001 740.66 3.75 165.16 644.27 740.38 -10.48 15.19 13.37 -11.71 6.45 1.34 5959228.32 600010.05 70.29802028 -149.19008966 773.07 3.87 171.95 676.61 772.72 -12.49 17.34 15.43 -13.81 6.87 1.44 5959226.22 600010.51 70.29801452 -149.19008622 866.86 4.54 196.60 770.15 866.26 -19.19 24.12 21.44 -20.51 6.26 2.04 5959219.52 600009.98 70.29799624 -149.19009122 928.88 5.29 204.49 831.95 928.06 -24.39 29.42 25.83 -25.46 4.37 1.63 5959214.54 600008.16 70.29798270 -149.19010649 992.38 4.86 203.33 895.20 991.31 -29.83 35.04 30.67 -30.59 2.09 0.70 5959209.38 600005.95 70.29796868 -149.19012495 1052.80 6.03 201.24 955.34 1051.45 -35.42 40.77 35.90 -35.90 -0.07 1.96 5959204.04 600003.86 70.29795418 -149.19014246 1116.11 7.08 199.34 1018.24 1114.35 -42.52 48.00 42.76 -42.68 -2.57 1.69 5959197.23 600001.45 70.29793565 -149.19016268 1178.93 9.25 199.95 1080.42 1176.53 -51.30 56.92 51.39 -51.08 -5.57 3.46 5959188.79 599998.56 70.29791270 -149.19018701 1242.68 11.93 207.04 1143.08 1239.19 -62.63 68.62 62.63 -61.77 -10.32 4.67 5959178.04 599993.96 70.29788350 -149.19022543 1305.89 14.79 213.98 1204.58 1300.69 -76.20 83.21 76.39 -74.28 -17.80 5.18 5959165.43 599986.64 70.29784932 -149.19028601 1369.55 17.35 216.28 1265.74 1361.85 -92.08 100.82 92.98 -88.68 -27.96 4.14 5959150.91 599976.68 70.29781000 -149.19036828 1432.88 18.73 219.29 1325.96 1422.07 -109.34 120:43 111.57 -104.16 -39.99 2.63 5959135.27 599964.86 70.29776770 -149.19046566 1496.11 20.04 209.06 1385.62 1481.73 -128.36 141.37 132.03 -121.49 -51.68 5.75 5959117.78 599953.39 70.29772035 -149.19056036 1559.66 19.62 203.31 1445.41 1541.52 -148.99 162.91 153.53 -140.81 -61.19 3.14 5959098.34 599944.14 70.29766758 -149.19063737 1622.69 20.09 201.54 1504.69 1600.80 -169.86 184.32 174.93 -160.60 -69.36 1.21 5959078.45 599936.24 70.29761352 -149.19070346 1686.35 20.75 202.69 1564.35 1660.46 -191.53 206.53 197.14 -181.17 -77.72 1.21 5959057.77 599928.16 70.29755731 -149.19077119 1749.26 19.97 201.23 1623.33 1719.44 -212.90 228.41 219.02 -201.47 -85.91 1.48 5959037.37 599920.24 70.29750186 -149.19083749 1812.69 18.42 195.16 1683.24 1779.35 -233.48 249.25 239.78 -221.24 -92.45 3.98 5959017.51 599913.96 70.29744785 -149.19089048 1908.01 18.79 194.16 1773.58 1869.69 -263.77 279.66 269.93 -250.66 -100.15 0.51 5958987.99 599906.66 70.29736747 -149.19095277 2001.40 17.57 195.06 1862.31 1958.42 -292.79 308.80 298.86 -278.86 -107.49 1.34 5958959.70 599899.69 70.29729044 -149.19101222 2096.71 19.40 195.68 1952.69 2048.80 -322.85 339.01 328.94 -307.99 -115.51 1.93 5958930.47 599892.06 70.29721085 -149.19107712 2192.61 20.96 195.80 2042.70 2138.81 -355.74 372.10 361.91 -339.83 -124.48 1.63 5958898.51 599883.51 70.29712386 -149.19114979 2288.70 21.16 195.68 2132.38 2228.49 -390.06 406.63 396.35 -373.07 -133.85 0.21 5958865.16 599874.59 70.29703306 -149.19122563 2383.33 20.99 196.32 2220.68 2316.79 -423.87 440.65 430.31 -405.78 -143.23 0.30 5958832.33 599865.65 70.29694370 -149.19130156 2478.39 20.68 196.19 2309.52 2405.63 -457.45 - 474.46 464.07 -438.23 -152.69 0.33 5958799.75 599856.62 70.29685503 -149.19137819 2574.41 20.43 194.89 2399.43 2495.54 -490.98 508.18 497.72 -470.71 -161.72 0.54 5958767.16 599848.02 70.29676630 -149.19145132 2668.62 20.21 194.89 2487.78 2583.89 -523.55 540.89 530.36 -502.33 -170.13 0.23 5958735.44 599840.03 70.29667992 -149.19151939 2763.65 17.81 196.84 2577.62 2673.73 -554.31 571.84 561.27 -532.11 -178.56 2.61 5958705.55 599832.00 70.29659857 -149.19158763 2858.44 15.05 194.04 2668.53 2764.64 -580.96 598.64 588.03 -557.93 -185.75 3.03 5958679.64 599825.16 70.29652804 -149.19164582 2952.92 11.55 198.81 2760.46 2856.57 -602.53 620.36 609.73 -578.79 -191.77 3.88 5958658.70 599819.41 70.29647105 -149.19169461 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD\Z-69\Z-69\Z-69 10/9/2012 1:44 PM Page 1 of 3 Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ft) (°) (1I Ift) (ft) (ft) (ft) (ft) (ft) (ft) V11001t) (Bus) Iftu51 (°I 1°1 3017.33 9.78 200.43 2823.76 2919.87 -614.27 632.28 621.65 -590.02 -195.76 2.79 5958647.42 599815.57 70.29644036 -149.19172691 3080.20 8.44 197.04 2885.83 2981.94 -624.09 642.23 631.60 -599.43 -198.98 2.30 5958637.97 599812.48 70.29641464 -149.19175295 3142.97 5.93 194.91 2948.11 3044.22 -631.88 650.08 639.44 -606.97 -201.16 4.02 5958630.40 599810.40 70.29639404 -149.19177063 3206.33 3.63 200.94 3011.24 3107.35 -637.11 655.36 644.71 -612.01 -202.72 3.71 5958625.34 599808.91 70.29638028 -149.19178326 3249.79 3.81 216.81 3054.61 3150.72 -639.74 658.16 647.46 -614.45 -204.08 2.40 5958622.88 599807.58 70.29637362 -149.19179424 9-5/8" 3269.00 3.70 223.56 3073.78 3169.89 -640.82 659.42 648.62 -615.41 -204.89 2.37 5958621.91 599806.79 70.29637099 -149.19180080 3313.68 3.67 240.06 3118.37 3214.48 -642.93 662.27 651.00 -617.17 -207.12 2.37 5958620.12 599804.58 70.29636618 -149.19181889 3376.78 4.57 235.36 3181.31 3277.42 -645.96 666.80 654.53 -619.61 -210.94 1.52 5958617.64 599800.79 70.29635953 -149.19184980 3439.74 5.43 269.86 3244.04 3340.15 -648.21 672.13 657.53 -621.04 -215.99 4.88 5958616.14 599795.77 70.29635561 -149.19189064 3503.14 7.21 293.23 3307.06 3403.17 -647.77 679.01 658.27 -619.48 -222.64 4.88 5958617.61 599789.09 70.29635988 -149.19194454 3566.44 7.83 305.86 3369.82 3465.93 -644.91 687.26 656.89 -615.39 -229.79 2.7B 5958621.61 599781.89 70.29637106 -149.19200239 3629.23 9.76 321.87 3431.88 3527.99 -639.43 696.80 653.04 -608.69 -236.54 4.94 5958628.21 599775.05 70.29638934 -149.19205708 3699.64 10.35 338.18 3501.42 3597.53 -629.98 709.05 645.42 -598.09 -242.60 4.10 5958638.73 599768.85 70.29641830 -149.19210610 3763.54 10.22 347.77 3564.10 3660.21 -619.84 720.40 636.67 -587.26 -245.92 2.69 5958649.51 599765.39 70.29644790 -149.19213302 3826.99 10.54 358.58 3626.52 3722.63 -608.91 731.80 626.79 -575.95 -247.26 3.11 5958660.80 599763.90 70.29647878 -149.19214384 3889.65 12.38 7.95 3687.93 3784.04 -596.57 744.22 615.11 -563.57 -246.47 4.17 5958673.19 599764.52 70.29651261 -149.19213747 3952.95 14.55 7.18 3749.49 3845.60 -581.84 758.96 600.96 -548.96 -244.54 3.44 5956687.83 599766.26 70.29655253 -149.19212183 4016.26 16.51 10.36 3810.48 3906.59 -564.90 775.91 584.62 -532.22 -241.93 3.37 5958704.60 599768.65 70.29659827 -149.19210069 -_ 4079.49 18.43 12.53 3870.80 3966.91 -545.93 794.89 566.14 -513.62 -238.14 3.21 5958723.24 599772.19 70.29664907 -149.19207005 4144.04 20.24 12.91 3931.70 4027.81 -524.59 816.26 545.27 -492.78 -233.43 2.81 5958744.15 599776.62 70.29670602 -149.19203193 4203.83 22.62 12.55 3987.35 4083.46 -502.79 838.10 523.98 -471.47 -228.62 3.99 5958765.51 599781.14 70.29676423 -149.19199299 4270.78 23.79 9.98 4048.89 4145.00 -476.42 864.48 498.50 -445.60 -223.48 2.31 5958791.45 599785.93 70.29683490 -149.19195140 4333.66 25.48 6.67 4106.05 4202.16 -450.23 890.68 473.71 -419.67 -219.72 3.47 5958817.42 599789.36 70.29690573 -149.19192088 4397.75 27.48 6.11 4163.41 4259.52 -421.70 919.25 447.20 -391.27 -216.54 3.14 5958845.85 599792.15 70.29698331 -149.19189518 4460.97 29.98 8.24 4218.84 4314.95 -391.34 949.64 419.13 -361.13 -212.72 4.27 5958876.04 599795.57 70.29706566 -149.19186428 4523.54 31.96 8.30 4272.49 4368.60 -359.15 981.83 389.52 -329.27 -208.09 3.16 5958907.96 599799.78 70.29715270 -149.19182679 4586.04 33.95 6.74 4326.61 4422.72 -324.09 1016.92 357.97 -294.49 -203.51 3.35 5958942.79 599803.89 70.29724772 -149.19178972 4651.03 36.50 6.70 4378.06 4474.17 -287.81 1053.25 326.32 -258.41 -199.26 4.05 5958978.92 599807.66 70.29734629 -149.19175531 4714.13 37.85 5.11 4428.34 4524.45 -249.76 1091.37 294.58 -220.49 -195.35 2.63 5959016.89 599811.07 70.29744989 -149.19172363 4777.84 40.08 3.52 4477.88 4573.99 -209.87 1131.43 263.80 -180.54 -192.35 3.84 5959056.87 599813.54 70.29755902 -149.19169934 4841.28 42.64 2.47 4525.49 4621.60 -168.22 1173.35 235.36 -138.68 -190.17 4.18 5959098.75 599815.16 70.29767338 -149.19168169 4905.26 44.97 3.12 4571.66 4667.77 -124.24 1217.63 210.40 -94.45 -188.00 3.71 5959143.00 599816.74 70.29779422 -149.19166417 4968.79 46.98 1.89 4615.81 4711.92 -78.91 1263.31 192.31 -48.82 -186.01 3.46 5959188.65 599818.12 70.29791888 -149.19164809 5032.24 48.38 1.86 4658.53 4754.64 -32.41 1310.22 184.49 -1.93 -184.48 2.21 5959235.56 599819.03 70.29804698 -149.19163567 5095.61 49.90 1.37 4699.98 4796.09 15.06 1358.15 188.81 45.98 -183.13 2.47 5959283.47 599819.74 70.29817785 -149.19162476 5159.29 51.87 0.84 4740.16 4836.27 63.93 1407.55 205.64 95.37 -182.18 3.16 5959332.87 599820.03 70.29831280 -149.19161708 5222.61 53.87 1.30 4778.38 4874.49 113.86 1458.03 232.63 145.84 -181.24 3.21 5959383.35 599820.31 70.29845069 -149.19160943 5286.00 54.60 2.43 4815.43 4911.54 164.84 1509.47 266.74 197.25 -179.56 1.85 5959434.77 599821.30 70.29859113 -149.19159587 5348.99 55.66 3.12 4851.44 4947.55 216.16 1561.15 305.43 248.87 -177.06 1.91 5959486.41 599823.11 70.29873214 -149.19157560 5412.77 57.14 3.72 4886.73 4982.84 268.98 1614.27 348.39 301.90 -173.88 2.45 5959539.47 599825.58 70.29887701 -149.19154993 5476.17 57.78 4.61 4920.84 5016.95 322.20 1667.72 393.79 355.20 -170.00 1.56 5959592.82 599828.75 70.29902263 -149.19151850 5539.26 57.65 5.45 4954.53 5050.64 375.37 1721.05 440.53 408.33 -165.33 1.14 5959646.00 599832.72 70.29916778 -149.19148064 5502.42 58.00 5.98 4988.17 5084.26 428.71 1774.51 488.47 461.53 -160.00 0.90 5959699.25 599837.34 70.29931310 -149.19143754 5665.92 56.71 5.37 5022.42 5118.53 482.06 1827.98 537.48 514.73 -154.71 2.19 5959752.52 599841.92 70.29945846 -149.19139472 5728.71 54.51 6.39 5057.88 5153.99 533.76 1879.79 585.65 566.27 -149.41 3.75 5959804.12 599846.53 70.29959926 -149.19135179 5791.90 54.31 5.94 5094.66 5190.77 585.06 1931.18 633.91 617.36 -143.89 0.66 5959855.27 599851.37 70.29973883 -149.19130711 5855.46 55.07 6.09 5131.40 5227.51 636.83 1983.05 683.12 668.94 -138.46 1.21 5959906.92 599656.12 70.29987974 -149.19126310 5918.15 55.18 6.39 5167.24 5263.35 688.18 2034.48 732.22 720.07 -132.87 0.43 5959958.11 599851.03 70.30001942 -149.19121784 5981.31 54.69 6.48 5203.53 5299.64 739.80 2086.17 781.83 771.44 -127.07 0.78 5960009.55 599866.14 70.30015976 -149.19117093 6045.02 53.44 5.70 5240.92 5337.03 791.29 2137.76 831.67 822.73 -121.60 2.20 5960060.90 599870.93 70.30029988 -149.19112660 6108.28 53.78 5.86 5278.45 5374.56 842.11 2188.68 881.12 873.39 -116.47 0.57 5960111.63 599875.38 70.30043830 -149.19108507 6171.77 54.15 6.10 5315.80 5411.91 893.35 2240.02 931.11 924.46 -111.12 0.66 5960162.75 599880.05 70.30057780 -149.19104176 6235.48 54.25 6.13 5353.07 5449.18 944.93 2291.70 981.53 975.83 -105.62 0.16 5960214.19 599884.87 70.30071816 -149.19099719 6297.92 54.43 6.49 5389.47 5485.58 995.58 2342.43 1031.12 1026.26 -100.04 0.55 5960264.68 599889.77 70.30085591 -149.19095204 6392.43 54.74 6.77 5444.23 5540.34 1072.51 2419.45 1106.53 1102.77 -91.15 0.41 5960341.30 599897.65 70.30106493 -149.19088002 6487.56 55.41 6.09 5498.70 5594.81 1150.39 2497.45 1183.15 1180.27 -82.41 0.92 5960418.90 599905.35 70.30127667 -149.19080931 6582.52 55.96 6.11 5552.23 5648.34 1228.68 2575.88 1260.44 1258.26 -74.06 0.58 5960496.99 599912.64 70.30148973 -149.19074182 6676.60 54.18 6.17 5606.10 5702.21 1305.68 2653.01 1336.57 1334.95 -65.83 1.89 5960573.77 599919.87 70.30169923 -149.19067502 6771.70 51.69 5.89 5663.41 5759.52 1381.42 2728.89 1411.59 1410.41 -57.86 2.63 5960649.32 599926.84 70.30190538 -149.19061044 6866.91 49.48 7.58 5723.86 5819.97 1454.88 2602.44 1484.26 1483.45 -49.25 2.70 5960722.47 599934.47 70.30210492 -149.19054073 6961.62 47.59 9.20 5786.57 5882.68 1525.83 2873.40 1554.14 1553.65 -38.91 2.37 5960792.80 599943.88 70.30229672 -149.19045699 7056.39 44.42 10.06 5852.39 5948.50 1593.99 2941.57 1621.10 1620.86 -27.52 3.41 5960860.15 599954.37 70.30248033 -149.19036474 7151.36 40.25 11.54 5922.58 6018.69 1657.92 3005.51 1683.75 1683.68 -15.57 4.51 5960923.11 599965.48 70.30265193 -149.19026797 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD1Z-69)Z-69\Z-69 10/9/2012 1:44 PM Page 2 of 3 Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude (ftl 1°I 1°I (ftl (ft) (ftl (ft) (ft) (ftl Ift) V/10081 MUST Must (1 1 1 7245.49 38.93 12.21 5995.12 6091.23 1717.86 3065.50 1742.38 1742.38 -3.23 1.47 5960981.97 599977.04 70.30281231 -149.19016804 7278.32 38.20 12.35 6020.79 6116.90 1738.30 3085.97 1762.38 1762.38 1.12 2.24 5961002.02 599981.12 70.30286694 -149.19013278 7334.68 37.32 14.02 6065.35 6161.46 1772.74 3120.48 1796.00 1795.98 8.99 2.39 5961035.72 599988.54 70.30295873 -149.19006907 7429.20 38.29 15.84 6140.03 6236.14 1830.41 3178.41 1852.11 1851.95 23.93 1.56 5961091.88 600002.73 70.30311165 -149.18994810 7524.05 38.21 14.73 6214.52 6310.63 1888.83 3237.13 1909.00 1908.59 39.41 0.73 5961148.72 600017.45 70.30326639 -149.18982272 7619.30 38.37 15.00 6289.28 6385.39 1947.60 3296.15 1966.40 1965.64 54.55 0.24 5951205.95 600031.83 70.30342223 -149.18970008 7714.31 38.00 14.32 6363.96 5460.07 2006.09 3354.89 2023.65 2022.46 69.41 0.59 5961262.96 600045.94 70.30357747 -149.18957967 7809.35 37.92 13.71 6438.89 6535.00 2064.37 3413.35 2080.86 2079.18 83.57 0.40 5961319.86 600059.34 70.30373242 -149.18946500 7904.52 37.33 17.04 6514.28 6610.39 2122.15 3471.44 2137.48 2135.19 98.96 2.22 5961376.06 600073.98 70.30388542 -149.18934035 7999.39 37.79 14.93 6589.48 6685.59 2179.61 3529.26 2193.79 2190.78 114.88 1.44 5961431.85 600089.16 70.30403729 -149.18921141 8094.13 37.61 15.07 6664.44 6760.55 2237.28 3587.20 2250.49 2246.74 129.87 0.21 5961488.01 600103.41 70.30419017 -149.18908995 8189.45 37.21 15.01 6740.16 6836.27 2294.92 3645.11 2307.22 2302.66 144.90 0.42 5961544.12 600117.69 70.30434295 -149.18896823 8283.72 36.42 15.09 6815.63 6911.74 2351.15 3701.60 2362.61 2357.22 159.57 0.84 5961598.86 600131.62 70.30449198 -149.18884941 8379.68 35.90 14.28 6893.10 6989.21 2407.54 3758.22 2418.25 2411.99 173.92 0.74 5961653.81 600145.25 70.30464161 -149.18873312 8474.81 39.35 15.08 6968.44 7064.55 2465.37 3816.28 2475.35 2468.15 188.65 3.66 5961710.16 600159.23 70.30479505 -149.18861380 8569.34 39.21 14.91 7041.61 7137.72 2524.94 3876.13 2534.20 2525.96 204.14 0.19 5961768.17 600173.94 70.30495298 -149.18848836 8664.59 36.35 18.42 7116.89 7213.00 2582.82 3934.47 2591.28 2581.85 220.81 3.76 5961824.27 600189.87 70.30510568 -149.18835331 8758.74 35.35 18.46 7193.21 7289.32 2637.29 3989.61 2644.92 2634.16 238.25 1.06 5961876.80 600206.61 70.30524858 -149.18821202 8853.41 34.54 19.02 7270.81 7366.92 2690.82 4043.83 2697.66 2685.51 255.67 0.92 5961928.38 600223.34 70.30538886 -149.18807091 8948.90 34.41 19.19 7349.53 7445.64 2744.12 4097.88 2750.21 2736.59 273.36 0.17 5961979.68 600240.35 70.30552839 -149.18792760 9043.72 34.18 18.74 7427.86 7523.97 2796.82 4151.31 2802.24 2787.12 290.72 0.36 5962030.42 600257.04 70.30566642 -149.18778693 9139.36 34.04 18.74 7507.05 7603.16 2849.76 4204.94 2854.57 2837.91 307.96 0.15 5952081.43 600273.59 70.30580518 -149.18764734 9234.11 34.00 17.93 7585.58 7681.69 2902.14 4257.95 2906.41 2888.22 324.63 0.48 5962131.97 600289.59 70.30594264 -149.18751224 9329.00 33.48 17.74 7664.49 7760.60 2954.29 4310.66 2958.09 2938.40 340.77 0.56 5962182.34 600305.07 70.30607970 -149.18738146 9424.71 33.24 18.35 7744.43 7840.54 3006.34 4363.29 3009.69 2988.44 357.08 0.43 5962232.59 600320.70 70.30621641 -149.18724939 9519.44 33.54 17.16 7823.52 7919.63 3057.93 4415.42 3060.89 3038.09 372.97 0.76 5962282.44 600335.93 70.30635205 -149.18712061 9614.57 33.67 19.08 7902.76 7998.87 3109.99 4468.07 3112.57 3088.12 389.35 1.13 5962332.69 600351.64 70.30648873 -149.18698795 9708.50 35.36 20.68 7980.15 8076.26 3162.33 4521.29 3164.50 3138.16 407.46 2.04 5962382.96 600369.08 70.30662543 -149.18684121 9804.54 34.84 20.59 8058.73 8154.84 3216.52 4576.51 3218.28 3189.84 426.92 0.54 5962434.89 600387.85 70.30676662 -149.18668354 9899.20 34.14 20.12 8136.75 8232.86 3269.17 4630.11 3270.59 3240.09 445.56 0.79 5962485.38 600405.82 70.30690390 -149.18653246 9994.47 33.95 19.69 8215.69 8311.80 3321.53 4663.45 3322.76 3290.24 463.72 0.32 5962535.76 600423.31 70.30704091 -149.18638533 10089.24 35.57 19.19 8293.54 8389.65 3374.85 4737.48 3375.74 3341.19 481.70 1.74 5962586.95 600440.61 70.30718010 -149.18623967 10183.70 35.39 18.61 8370.46 8466.57 3428.94 4792.30 3429.63 3393.06 499.46 0.40 5962639.04 500457.67 70.30732180 -149.18609577 10215.15 35.26 19.12 8396.12 8492.23 3446.89 4810.49 3447.51 3410.28 505.34 1.00 5962656.33 600463.33 70.30736882 -149.18604812 7" 10280.00 36.33 19.31 8448.71 8544.82 3484.29 4848.43 3484.79 3446.10 517.83 1.63 5962692.31 600475.33 70.30746669 -149.18594695 10310.10 36.82 19.39 8472.89 8569.00 3501.96 4866.37 3502.41 3463.03 523.77 1.63 5962709.31 600481.05 70.30751292 -149.18589880 10332.58 36.03 19.93 8490.97 8587.08 3515.10 4879.72 3515.51 3475.59 528.26 3.79 5962721.94 600485.37 70.30754726 -149.18586242 10363.98 31.63 21.67 8517.05 8613.16 3532.24 4897.19 3532.60 3491.94 534.45 14.35 5962738.36 600491.34 70.30759190 -149.18581226 10395.98 29.72 22.43 8544.57 8640.68 3548.18 4913.52 3548.49 3507.07 540.58 6.09 5962753.57 600497.27 70.30763324 -149.18576262 10427.08 29.51 22.62 8571.61 8667.72 3563.15 4928.89 3563.42 3521.26 546.47 0.74 5962767.84 600502.96 70.30767202 -149.18571492 10521.61 28.92 18.88 8654.12 8750.23 3608.38 4975.01 3608.55 3564.39 562.82 2.03 5962811.18 600518.74 70.30778982 -149.18558242 10616.58 29.00 18.43 8737.22 8833.33 3653.78 5021.00 3653.88 3607.95 577.53 0.24 5962854.93 600532.87 70.30790885 -149.18546324 _ 10711.05 27.55 16.09 8820.42 8916.53 3698.12 5065.74 3698.18 3650.67 590.82 1.93 5962897.82 600545.59 70.30802555 -149.18535550 10806.42 25.68 16.35 8905.68 9001.79 3740.55 5108.46 3740.58 3691.70 602.75 1.96 5962939.00 600556.97 70.30813762 -149.18525882 10901.39 25.21 15.52 8991.43 9087.54 3781.09 5149.27 3781.11 3730.93 613.96 0.62 5962978.37 600567.65 70.30824480 -149.18516802 10964.69 24.66 12.36 9048.84 9144.95 3807.69 5175.95 3807.70 3756.82 620.39 2.28 5963004.34 600573.74 70.30831553 -149.18511588 TD 11021.00 24.66 12.36 9100.01 9196.12 3831.16 5199.44 3831.17 3779.77 625.42 0.00 5963027.36 600578.47 70.30837823 -149.18507512 Survey Error Model: ISCWSA Rev 0 ••• 3-D 95.000% Confidence 2.7955 sigma Survey Program: Description MD From MD To EOU Freq Hole Size Casing Diameter (ft) (ftl (ft) lint (int Survey Tool Type Borehole I Survey 0.000 40.010 Act Stns 12.250 9.625 UNDEFINED Z-69 / Z-69 40.010 677.000 Act Stns 12.250 9.625 GYD-GC-SS Z-69 / Z-69 677.000 3206.330 Act Stns 12.250 9.625 MWD+IFR+MS Z-69 / Z-69 3206.330 3313.680 Act Stns 8.750 7.000 INC+TREND Z-69 / Z-69 3313.680 10215.150 Act Stns 8.750 7.000 MWD+IFR+MS Z-69 / Z-69 10215.150 10964.690 Act Stns 6.125 4.500 MWD+IFR+MS Z-69 / Z-69 10964.690 11021.000 Act Stns 6.125 4.500 BLIND Z-69 / Z-69 Legal Description: Northino IYI Eastino 1X1 Surface: 4432.3 FSL 2671.8 FEL S19 T11 N R12E UM 5959239.940 600003.450 BHL: 2932 FSL 2032 FEL 18 T11N R12EUM 5963027.360 600578.470 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD\Z-69\Z-69\Z-69 10/9/2012 1:44 PM Page 3 of 3 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATP. Form 10-404 Revised 5/2015 V / L 5-/" 7_7 ` `l' RBDMS L� h: `�.'y 1 9 2016 Submit Original Only { 1. Operations Performed Abandon ❑ Plug Perforations ❑ 'Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate V Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development Q Exploratory ❑ 5. Permit to Drill Number: 212-076 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23471-00-00 7. Property Designation (Lease Number): ADL 0028262 8. Well Name and Number: PBU Z-69 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 11021 feet Plugs measured feet true vertical 9196 feet Junk measured feet Effective Depth: measured 10933 feet Packer measured 9985 feet true vertical 9116 feet Packer true vertical 8303.91 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 91.5# A-53 41 - 121 41 -121 1533 515 Surface 3229 9-5/8" 40# L-80 41 -3270 41 -3171 5750 3090 Intermediate 10243 7" 26# L-80 38-10281 38-8546 7240 5410 Production Liner 917 4-1/2" 12.6# 13Cr8 10103 - 11020 8401 -9195 8430 7500 Perforation Depth: Measured depth: 10660 - 10670 feet 10674 - 10682 feet 10682 - 10692 feet 10692 - 10694 feet True vertical depth: 8871 - 8880 feet feet 8884 - 8891 feet 8891 - 8900 feet 8900 - 8901 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 36-10109 36-8405 Packers and SSSV (type, measured and See Attachment See Attachment See Attachment true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 56 0 0 901 265 Subsequent to operation: 257 22 628 1399 285 14. Attachments: (required per 20 AAc 25.070.25.071, a 25.283) 15. Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ I GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Catron, Garry R (Wipro) Email Garry,Catron@bp.com Printed Name Catron, Garry R (Wipro) Title PDC Principal Enqineer Signature Phone +1 907 564 4424 Date Form 10-404 Revised 5/2015 V / L 5-/" 7_7 ` `l' RBDMS L� h: `�.'y 1 9 2016 Submit Original Only { Packers and SSV's Attachment PBU Z-69 SW Name Type MD TVD Depscription Z-69 TBG PACKER 9984.96 8303.91 4-1/2" HES TNT Perm Packer Z-69 PACKER 10114.35 8410.08 5" Baker ZXP Top Packer Daily Report of Well Operations PBU Z-69 ACTIVITYDATE SUMMARY T/I/O= 1385/1727/9 TEMP= S/I (PERFORATING) TUBING THAW Pumped 0.14 bbls of meth down TBG before pressuring up. Pumped 5 bbls meth followed by 783 bbls of 180*f cude down IA to thaw TBG Pumped 10 bbls Neat Meth, 45 bbls Crude down Tubing before well locked up ** 4/17/2016 CONTINUED ON WSR 04-18-16** ** CONTINUED FROM 04-17-16 ** TEMP= S/I T/I/O= 2083/952/89 (TBG THAW) Pumped 293 bbls 180* Crude down IA to thaw Tubing Pumped 130 bbls 180* Crude down Tubing for H.O.T Pumped 3 bbls Neat Meth down F/L for Freeze protect F/P Tag hung on WV DSO notified to POP 4/18/2016 SV, SSV, WV= Closed MV= Open IA/OA= OTG's FWHP's 1800/900/130 ***WELL S/I ON ARRIVAL***(pert) DRIFT & TAG BOTTOM @ 10,772' SLM (80' of rat hole). SUBSIDENCE DRIFT W/ 20'3.70" DUMMY WHIPSTOCK TO 2,500'W/ NO ISSUES 4/22/2016 ***WELL S/I ON DEPARTURE*** ***WELL SHUT IN UPON ARRIVAL***(PERFORATE) RIG UP E LINE 4/24/2016 ***JOB CONTINUED ON 25 -APR -16*** ***JOB CONTINUED FROM 24-APR-16***(HES ELINE ADPERF) RIG UP E LINE RUN 1: PERFORATE 10674'-10694' WITH 20'x 2-7/8" 6 SPF, 60 DEG PHASED, MAX FORCE CHARGES RUN 2: PERFORATE 10660'-10670' WITH 10' x 2-7/8" 6 SPF, 60 DEG PHASED, MAX FORCE CHARGES LOG CORRELATED TO SLB SONIC SCANNER LOG DATED 06 -OCT -12 RDMO E LINE 4/25/2016 ***JOB COMPLETE***(WELL LEFT SHUT IN, HANDED BACK TO DSO) Fluids Summary Bbls T e 18 Neat Methanol 1251 Crude 2 Diesel TF&E = 4-1/16" CIW VMELLHEAD = FMC ACTUATOR = BAKER C WAL KB. ELE 96.9 BF. ELEV = 56.1 KOP = 600 Max Angle = 581 @ 5476' Datum MD = 10688' Datum TVD = 8800' SS 20" INSULATED CONDUCTOR �— —80 91.5#, A-53, D = 19-124' 9-5/8" CSG, 40#, L-80 BTC, ID = 8.835' Minimum ID = 3.726" @ 10096' 4-1/2" HES XN NIPPLE TOP OF 4-1/2* LNR I 10102" 4=1/2" TBG, 12.6#, 13CR-80 VAM TOP, 10107- .0152 bpf, D = 3.958" 7' CSG, 26#, L-80 VAM TOP HC, 10156' XO TO L-80 BTC, D =????? 7" CSG, 26#, L-80 VAM TOP HC, 80' 102 .0383 bpf, ID = 6.276' ^� PBTD -1__10933- 4-1/2- 110933'4-1/2" LNR 12.6#, 13CR-80 VAM TOP, 11019' .0152 bpf, D = 3.958" [7SAt-i , ..OTES: 4-1/2" CHROME TBG& LNR GAS LIFT MANDRELS ST PERFORATION SUMMARY R T LOG: SLB SONIC SCANNER LOG ON 10/06/12 DEV ANGLE AT TOP PERF: 28' @ 10669 Nate- Refer to Production DB for historical perf data SEE SPF INTERVAL Opn/Sqz DATE SOZ 2-7/8" 6 10660 - 10670 O 05/12/13 09/25/14 2-7/8" 6 10660 - 10670 O 04/25/16 DMY 2-7/8" 6 10674 - 10694 O 04/25/16 5503 2-718" 6 10682 - 10692 O 11/12/12 09/25/14 PBTD -1__10933- 4-1/2- 110933'4-1/2" LNR 12.6#, 13CR-80 VAM TOP, 11019' .0152 bpf, D = 3.958" [7SAt-i , ..OTES: 4-1/2" CHROME TBG& LNR GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 3103 3004 8 KBG2 DOME BK 16 09/25/14 7 4674 4492 37 KBG2 DMY BK 0 11110/12 6 6328 5503 55 KBG2 DOME BK 16 09/25/14 5 7151 6019 40 KBG2 DMY BK 0 07108/14 4 7758 6495 38 KBG2 DMY SK 0 10111/12 3 8534 7111 39 KBG2 DOME BK 16 09/25114 2 9274 7715 34 KBG2 DMY BK 0 10111112 1 9921 8252 34 KBG2 SO I BK 22 09/25/14 99555' 1112" HE5 X NIP, D = 3.813" 9984' 10/11/12 NORDIC 1 INTIAL COMPLETION 7" X 4-1 /2" HES TNT PKR D = 3.856" 12/04/12 JU PJC CONDUCTOR DEPTH 10019' 4-1/2" HES X NIP, D = 3.813" 10096` 4-1/2" HES XN NIP, D = 3.725' 10102' 05122/14 KABJJMD ADD® ELMD DEPTH 7" X 5" BKR TACK SLV, D = ? 10108' 4-112" V17LEG, D= 4.100' 10123` HMD TT LOGGHI 1 1!11112 10112' 7" X5" BKR ZXP LTP,ID = 4.250" 10123' 7" X 5" BKR FLEX LOCK HGR D = 4.320" 10134' 5" X 4--112--XO, D = 3.900- 10690' 1-44-1/2' MAKER FUPJOINT DATE REV BY COMuENTS DATE REV BY COMMENTS 10/11/12 NORDIC 1 INTIAL COMPLETION 10/01/14 CJN/JMD GLV CIO (09/25114) 12/04/12 JU PJC CONDUCTOR DEPTH 04/27/16 CJS/JMD REPE2F/ADFERF (04125116) 12/27/12 DLW/JMD GLV GO (12/21/12) 05/22113 ATO/JM3 ADPERFSIPERF CORR (05/12/13) 05122/14 KABJJMD ADD® ELMD DEPTH 07/11/14 RCT/JMD I GLV CJO (07/08/14) PRUDHOE BAY UNTT WELL Z-69 PERMIT No: "2120760 API No: 50-029-23741-00 SEC 19, T11 N, R12E, 848' FNL & 2281' FWL BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMM ,.N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate Q Alter Casing ❑ Change Approved Progra ❑ a Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: N» ✓ Q G/ t 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development Q ExploratoryAK to Drill Number: 212-0763. Address: P.O. Box 196612 Anchorage, F5�ermit 99519-6612 Stratigraphic ElService ❑API Number: 50-029-23471-00-00 7. Property Designation (Lease Number): ADL 0028262 8. Well Name and Number: PBU Z-69 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 11021 feet Plugs measured None feet true vertical 9196 feet Junkmeasured None feet JUL 13 2n Effective Depth: measured 10933 feet Packer measured See Attachment feet true vertical 9116 feet Packer true vertical See Attachment feet AOG CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 91.5# A-53 41 -121 41 -121 1533 515 Surface 3229 9-5/8" 40# L-80 40-3269 40-3170 5750 3090 Intermediate 10243 7" 26# L-80 38-10281 38-8545 7240 5410 Production Liner 917 4-1/2" 12.6# 13Cr8 10103 - 11019 8401 -9195 8430 7500 Perforation Depth: Measured depth: 10660 - 10670 feet 10682-10692 feet True vertical depth: 8871 -8880 feet 8891-8900 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr8 36-10108 36-8405 Packers and SSSV (type, measured and See Attachment See Attachment See Attachment true vertical depth) 12. Stimulation or cement squeeze summary: 10660'- 10692' Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 25 BBLS 9:1 MUD ACID, 14 BBLS 12% HCL, 96.5 BBLS NH4CL 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 165 170 164 1108 250 Subsequent to operation: 383 75 785 1203 321 14. Attachments: (required Per 20 AAC 25.070.25.071, a 25.283) 15. Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Summerhays, Nita M WIPRO Technologie Email Nita.Summerhays@bp.com Printed Name ummerha , Nit (WIPRO Technolo es) Title Petrotechnical Data Manager Signatu Phone +1 907 564-4035 Date 07/13/2015 Form 10-404 Revised 5/2015 VT L-- / Su t Original Only .0--,Z/��/�� RBDMS�Z JUL 17 2015 Daily Report of Well Operations PBU Z-69 ACTIVITYDATE SUMMARY 6/9/2015 ***WSR 6-9-15** unit move, continue to BP schedule on ***WSR 6-9-2015*** 6/10/2015 Asrc unit 2 ***WSR 6-10-15** standby for RAP. RU, PT standby *** continue on WSR 6-10-2015*** 6/11/2015 Asrc unit 2*** continue on WSR 6-11-15** standby for WS, flow well *** WSR 6-11-2015*** CTU 9 1.75" coil Objective Mill Scale -Mud Acid 6/11/2015 Swap from unit 3 to unit 9 and mobilize to Z -pad CTU 9 1.75" coil Objective: Mill Scale -Mud Acid MIRU-Perform Weekly BOP test. Z -pad is down for ESD testing. GC -2 is down. RU 2.875" milling bha to prep for milling taking returns to tanks with no AL. Ran into hydrates @ 341' POOH swap coil to hot KCL RBIH while pumping down coil to thaw hydrates. Wt ck at 3000' shut pump down 6/12/2015 and continue running in hole for a dry tag. ASRC Unit 2*** Continue from WSR 6-11-15** Standby for Ops (Proration and Pad ESD Testing), 6/12/2015 Assist CTU ***Continue WSR 6-13-2015*** ASRC Unit 2*** Continue from WSR 6-12-15*** Assist CTU/ SB for BP production ***Continue 6/13/2015 WSR 6-14-2015*** CTU 9 1.75" coil Objective: Mill Scale -Mud Acid --- Continue WSR from 6/12/15 --- Tagged at 10648' cleaned out to 10790' did not really see any motor work chased 20 bbls pill of powervis to surface from 10790'. Capped well w / 10 bbls of Methanol. Standby for AL to be available. 6/13/2015 ***Continued on 6/14/2015*** 6/14/2015 T/I/O=SI Assist CTU as directed (ACID) CTU got freed up, Job complete CTU 9 1.75" coil. Objective: Mill Scale, Mud Acid Continued from 6/13/2015. MU 2.5" JSN. Stab onto well. RIH pumping ammonium chloride down coil. Coil pump issues. Rig up pumpers. Continue pumping ammonium down coil. Swap to pumping down backside. Displace 4 bbls down backside before WHP rises to 1900psi and doesn't drop. Thought the formation had locked up. Spotted 5bbls of HCI down the coil to try to open up formation. Tried to pick up and were stuck. Calced stuck point at 4000'. Predicted hydrate/iceplug. Pumped hot fluid down the coil and surged the well. Kept pumping hot fluid down the coil, then tried to RIH. Free. Continue POOH. Injectivity test @ 1 bpm 1413 psi w / NH4C1 Job in progress. 6/14/2015 ASRC Unit 2*** Continue from WSR 6-13-15***SB for BP production / Assist CTU***Continue 6/14/2015 WSR 6-15-2015*** ASRC Unit 2***Continue from WSR 6/14/15***SB for DSO / POP Flow well***Continue WSR 6/15/2015 6/16/15 CTU 9 1.75" coil. Objective: Mill Scale, Mud Acid **** Continue WSR from 6/14/15 **** Pumped 14 bbls of 12% HCL acid & 25 bbls of 9:1 Mud acid reciprocated ocross pefs. Had a good drop in well head pressure when acid hit perfs . Injectvity at 1.3 bpm 1480 psi POOH / RDMO. 6/15/2015 **Job Complete** ASRC Unit 2***Continue from WSR 6/15/15***Flow Well, Acid flowback, Stabilize well***Continue 6/16/2015 on WSR 6/17/15*** 6/17/2015 ASRC Unit 2***Continue from WSR 6/16/15***Flow Well, 8hr Test***End WSR*** WHP: T/I/ / 100/1475/150 Temp = Sl Pumped 3 bbls of meth to ((((( Freeze Protect F/L on well Z-61))))), for well testers on well Z-69. 6/17/2015 FWHP: 100/1475/150/ SV/WV/SSV/ CLOSED MV/IA/OA/ OPEN Fluids Summary Daily Report of Well Operations PBU Z-69 Bbls Type 20 POWERVIS 18 METH 25 9:1 MUD ACID 15 DIESEL 14 12% HCL 96.5 NH4CL 3 FRESH WATER 5 HCL 118 KCL 41 50/50 METH 355.5 Total Packers and SSV's Attachment PBU Z-69 SW Name Type MD TVD Depscription Z-69 PACKER 9984.72 8303.71 4-1/2" HES TNT Perm Packer Z-69 PACKER 10114.11 8409.89 5" Baker ZXP Top Packer TREE= 4-1/16" CAN WELLHEAD = FMC ACTUATOR = BAKER C, INITIAL KB. ELE 96-9 BF. ELEV = 56.1 KOP= 600 3103 3004 8 KBG2 Datum TVD 8800' SS 20- 1,1SULATE1) CONDUCTOR 91-5#, A-53, U = 19.124* 19-5/8- CSG, 40#, L-80 STC, ID = 8.835- -80 �3269� �Minimum ID = 3.726"@ 10096' 4-1/2" HES XN NIPPLE Urtve NOTES: 4-1/2" CHROME TBG & LNR 4-1/2- HES X NP, ID= 3.813" GAS LIFT MADS ST MD TVD I DEV TYPE VLV LATCH PORT DATE 8 3103 3004 8 KBG2 DONE BK 16 09125/14 7 4674 4492 37 KBG2 DW BK 0 11110112 6 6328 5503 55 KBG2 DOW BK 16 09125114 5 7151 6019 40 KBG2 DMY BK 0 07/08114 4 7758 6495 38 KBG2 DW BK 0 10111112 3 8534 7111 39 KBG2 DOME BK 16 09/25/14 2 9274 7715 34 KBG21 DMY BK 0 10111/12 1 1 19921 18252 34 1 KBG2 SO I BK 1 22 109/25/14, .0383 bpf, ID = 6.276" 9955- 1--{4-1/2- HES X NIP, ID = 3-813- 7- X 4-V2- HES TNT PKR, V = 3.856- 10019- 7—F4-1/2- HES X NIP, 1) = 3.813" PERFORATION SLAWARY REF LOG: SLB SONIC SCANNER LOG ON 10/06/12 ANGLE AT TOP PERF: 28' @ 10660' Note: Refer to Production DB for historical perf data SIZE _SPF I INTERVAL OpnlSgz DATE S07- 2-7/8* 6 110660 - 106701 0 10 12J131 2-718" 6 10682-106921 0 11112!12 I PBTD -- 10933' 4-1/2- LNR, 12.6#, 13CR-80 VAM TOP, 11019' .0152 bpf, C1= 3.958" 10690' [--i4-1/2" MAKER PUP JOINT DATE REV BY COUBVE114TS DATE REV BY COMMENTS 10111/12 NORDIC 1 INITIAL COMPLETION 10/01/14 CJNJMD GLV C/O (09/25114) 1204/12 U PJC CONDUCTOR DEPTH 12127112 DLW/JM1D GLV C/O (12/21/12) .05/22/13. ATO/JMD.ADPERF&PERF CORR (05112/13) 105I22/141 KAB/JkU ADDED ELhU DEPTH 1 �10107� 10 14) TOP OF 4-1/2- L� 10102' r 10108* 4-1/2* TBG, 12-6#, 13CR-80 VAM TOP, 10107' '07' 1Q123' E3 hem TT LC3GGE3� 11/11/12 ,0152 bpf, 17 = 3.958' 10112 7' X 5' BKR ZXP LTP, H) = 4.250' -80 VAM TOP HC 10156' LOCK HGR, 1) = 4 -320 - XO TO L-80 BTC, =????? 10134• 7" CSG 26#, L-80 VAM TOP HC, 102W 0 .0383 bpf, ID = 6.276" PERFORATION SLAWARY REF LOG: SLB SONIC SCANNER LOG ON 10/06/12 ANGLE AT TOP PERF: 28' @ 10660' Note: Refer to Production DB for historical perf data SIZE _SPF I INTERVAL OpnlSgz DATE S07- 2-7/8* 6 110660 - 106701 0 10 12J131 2-718" 6 10682-106921 0 11112!12 I PBTD -- 10933' 4-1/2- LNR, 12.6#, 13CR-80 VAM TOP, 11019' .0152 bpf, C1= 3.958" 10690' [--i4-1/2" MAKER PUP JOINT DATE REV BY COUBVE114TS DATE REV BY COMMENTS 10111/12 NORDIC 1 INITIAL COMPLETION 10/01/14 CJNJMD GLV C/O (09/25114) 1204/12 U PJC CONDUCTOR DEPTH 12127112 DLW/JM1D GLV C/O (12/21/12) .05/22/13. ATO/JMD.ADPERF&PERF CORR (05112/13) 105I22/141 KAB/JkU ADDED ELhU DEPTH 1 10 14) PRLCHOE BAY LW WELL Z-69 P844T No: '2120760 AR No: 50-029-23741-00 SEC 19, T11 RVE, 848'FNL82281'FWI- BP Exploration (Alaska) STATE OF ALASKA X A OIL AND GAS CONSERVATION COMM JN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon L Repair Well L Plug Perforations L Perforate ✓ - Other Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown[:] Stimulate - Other ❑ Re-enter Suspended Well❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc Development❑✓ Stratigraphic❑ Exploratory ❑ Service ❑ 212-076-0 3. Address: P.O. Box 196612 6. API Number: Anchorage, AK 99519-6612 50-029-23471-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0028262 PBU Z-69 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL' 11. Present Well Condition Summary: Total Depth measured 11021 feet Plugs measured None feet true vertical 9196.12 feet Junk measured None feet Effective Depth measured 10933 feet Packer measured See Attachment feet true vertical 9116.18 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# A-53 40-120 40-120 0 0 Surface 3229 9-5/8" 40# L-80 40-3269 40-3169.89 5750 3090 Intermediate None None None None None None Production 10242 7" 26# L-80 38-10280 38-8544.82 7240 5410 Liner 917 4-1/2" 12.6# 13Cr80 10102 - 11019 8400.03 - 9194.3 8430 7500 i Perforation depth Measured depth 10660 - 10670 feet 10682 - 10692 feet VIE LU JUN 0 4 2013 True Vertical depth 8871.42 - 8880.23 feet 8890.82 - 8899.66 feet AO CC Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 35-10108 35-8404.92 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 565 96 164 960 253 Subsequent to operation: 564 -1074 144 924 259 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run ExploratorLI Development Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil ✓ Gas U WDSPLLJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCO 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays@BP.com Printed Name Ni a Summerhays Title Petrotechnical Data Technician Signat Phone 564-4035 Date 6/4/2013 kl- VJ_ F Form 10-404 Revised 10/2012 x/1¢1 3 RBDMS JUN - 7 201 Submit Original Only Daily Report of Well Operations ADL0028262 Pm or = emp = -line request) casing valve, ALP 1500 psi. T FL @ 2940'. 5/9/2013 E -line in control of valves on departure. 11.30 hrs. =58M 196/99 Temp= ssist SLine with rus and Flush 5/10/2013 (PERFORATING) RU and start PT ***Job Cont. to 5-11-13 WSR*** ***WELL FLOWING ON ARRIVAL pre ora ing RIG UP P/T HAVE LRS RIG UP 5/10/2013 ***JOB CONTINUED ON 5/11/13 WSR*** Pumped sPumped s o While 6lick Line Brushed Tbg. Slick Line in control of well for LRS departure. FWHP's= 5/11/2013 874/1770/269. CV's=OTG DRIFTED W/ 3-3/8" DUMMY GUN, 2-1/2" SAMPLE BAILER; SIT DOWN AT 10;683' SLM. RECOVER 1/2 GALLON SAND (E -LINE TARGET DEPTH 10,670' MD) 5/11/2013 ****WELL LEFT S/I ON DEPARTURE*** INITIAL T/I/O = 550/1600/100 PERFORATED INTERVAL= 10660'- 10670' GOOD INDICATION AT SURFACE POOH. FINAL T/I/O = 600/1600/100 WELL SHUT IN ON DEPARTURE. DSO NOTIFIED. 5/12/2013 ***JOB COMPLETE*** FLUIDS PUMPED 133 DIESEL 5 METH 13 8 1 TOTAL Packers and SSV's Attachment ADL0028262 SW Name Type MD TVD Depscription Z-69 PACKER 9984 8207 4-1/2" HES TNT Perm Packer Z-69 PACKER 10112 8312.06 5" Baker ZXP Top Packer TTS= 4-1/16" CIW WELLHEAD= FMC ACTUATOR = , BAKER C 1 5T_L KB. 3E BF. -ELEV = 96.9 56.1 KOP = 600 Max Angle = Datum MD = Datum TVD = 581 @ 5479 1068$' 8800' SS 20' INSULATED CONDUCTOR, +(91.5#, A-53, D = 19.124" 9-518" CSG, 40#, L-80 BTC, ID = 8.835" u 80 3269' Minimum ID = 3.726" @ 10096' 4-1/2" HES XN NIPPLE (TOP OF 4-1/2" LNR {- i 10102- 4-1/2' TBG, 126#, 13CR-80 VAM TOP, 1 10107' .0152 bpf, D = 1958" 11 7" CSG, 26#, L-80 VAM TOP HC, 10156' XO TO L-80 BTC, D =????? 7" CSG, 26#, L-80 VAM TOP HC, 10280` 0383 bpf, ID = 6.276" PERFORATION SUMMARY REF LOG: SLB SONIC SCANNER LOG ON 10/06/12 ANGLE AT TOP PERF: 28" @ 10660' Note: Refer to Production DB for historical perf data SIZE SPF I INTERNAL 2-7/8" 6 1 10660 - 10670 05/12/13 -718" 10682 - 10692 O 1 2112 PBTD 4-1/2' LNR, 12.6#, 13CR-80 VAM TOP, .0152 bpf, D = 3.958" j 10933' { 11019' SAI .DOTES: 4-112" CHROME TBG & LNR •`*� 1998' -14-1/2" HES X NIP, D = 3.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 8 3103 3004 8 KBG2 DOME BK 12 11/10/12 7 4674 4492 37 KBG2 DW BK 0 11/10/12 6 6328 5503 55 KBG2 DOME BK 16 11110/12 5 7151 6019 40 KBG2 DMY BK 0 10/08/12 4 7758 6495 38 KBG2 DW BK 0 10/08/12 3 8534 7111 39 KBG2 DOME BK 16 11/10112 2 9274 7715 34 KBG2 DW BK 0 10/08/12 1 9921 8252 34 KBG2 SO BK 22 12/21/12 9955' 4-112 HES X NTP, U=- 3.813" 99$4_ J—j 7" X 4-1/2" HES TNT PKR, D = 3.856" 10019' 4-1/2" HES X NiP, D = 3.813' 10096' 10101 7" X 5" BKR T�AC1C SIV, D = ? 10108' 4-1/2" WLEG, D=4.100" ELMD TT NOT LOGG@ 10112' 7" X 5" BKR ZXP LTP, tD = 4.250" 10123' 7" X 5" BKR FLEX LOCK HGP, D = 4.320" 10134' 5" X 4-1/2- XO, D = 3.900" 10690' 1-14-1/2' MAKER PUPJC T PRUDHOE BAY UNIT WELL: Z-69 PERW No: 2120760 API No: 50-029-23741-00 SEC 19, TI 1N, R12E, 848' FNL 8 2281' FWL DATE REV BY COMMENTS DATE REV BY COMMENTS 10/11112 NORDIC 1 IN71AL COMPLETION 12104!12 JU PJC CONDUCTOR DEPTH 10111/12 PJC DRLG HO CORRECTIONS 12/27/12 DLW/JMD GLV C!O (12121/12) 10/13/12 PJC DRLG DRAFT CORRECTIONS 05/22/13 ATOIJMD ADPERF&PERF CORR (05/12113) 11/12/12 DAS/PJC PERFORATION REMOVED 11/12/12 DASIPJC 1 GLV C/O (11/10/12) BP Exploration (Alaska) 11/13/12 JCU PJC ADPERFS (11/12112) by Date 04 -JAN -2013 ALAA Transmittal Number: 93275 40 BPXA WELL DATA TRANSMITTAL RECEIVED JAN 0 3 201.E Enclosed are the materials listed below. AOG CC (BPXA FIELD LOG DATA) nave any questions, please contact Doug Dortch at the PDC at 564-4973 IDellivery Contents 1 CD-ROM Containing Field Log Data & Electronic Log Prints for the following wells: 18-27E ., 18-27EPB1 r 18-27EPB2 P19L1 P-19L1PB1 >*��-{ 75� ZZU�C Z-69 2\2_ 7-1(27 ZZ,� a 1 -2-,- L"y'-5,657 V Y2: P ease Sign and R rn one copy of this transmittal. Thank You, Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 Stephanie Pacillo Data Manager Schlumberger Oilfield Services WIRELINE 2525 Gambell St, Ste. 400 Anchorage, AK 99503 W: Office: (907) 273-1770 NAME rORDER-# 2-08/K-16 CTBY-00007 NK -43 BAUJ-00158 3-31/K-32 CBTY-00006 Z-69 BZ81-00042 2-34/P,14 CDGM-00001 Z-69 BZ81-00039 F-478 BCRC-00216 C -42A C600-00054 MPE-03 CTBY-00005 MPB-20 CAIQ-00001 W-45 BCRC-00218 MPC -10 C2EW-00039 B -29A rOT4-00059 B -29A COT4-00059 X Please return a signed copy to: BP PDC 1-132-1 900 E Benson Blvd Anchorage AK 99508 DATE: 19 -Nov -12 TRANS#: 6210 a 47MakanaK Bender Rjj ° -� Natural Resources Technician II [ aska Oil & Gas Conservation JiC1, K C DIST DIST DISTe _. Cf?f;Dr FRfNTS PRINTS X SPINNER LOG ," 28 -Oct -12 1 X MEMORY CROSS FLOW24-Oct-12 1 1 CD X PPROF W/ GHOST 26 -Oct -12 1 CD X USIT 1 1 CD X 8 -Oct -12 1 1 CD SCMT 21 -Oct -12 1 X SONIC SCANNER 6 -Oct -12 1 CD X MEMORY PPROF GHOST 26 -Oct -12 1 1 GD X MEMORY LDL 6 -Oct -12 1 1 1 CD X USIT 8 -Oct -12 1 1 CD X !PROF W/ WATER FLOW 27 -Sep -12 1 1 CD X MEMORY PPROF W/ DEFT 28 -Oct -12 1 CD X1 IPROF `l+J; WATER FLOW 19 -Oct -12 1 1 CD X MEMORY (PROF19-Oct-12 1 1 CD X MEMORY PPROF W/ GHOST 19 -Oct -12 1 CD 1 1 CD Please return a signed copy to: DCS 2525 Gambell St, Suite 400 Anchorage AK 99503 N Stephanie Pacillo Data Manager Schlumberger Oilfield Services WIRELINE 2525 Gambell St, Ste. 400 Anchorage, AK 99503 W: Office: (907) 273-1770 DATE: 19 -Nov -12 TRANS#: 6210 `� .�' 7 VIakana K Bender Natural Resources Technician II i 1�1asl,a Oil &- C;as Collser-,jauozj �� _Z 10 6012 333 W� �_v� Sup<e 1001�IchAQ cc ..,,,.,..�� !+r�uSnta 111Ji, DIST DIST.. DIST —r! 2-08/K-16 CTBY-00007LOGGED X PONTS PRINTS NK -43 BAUJ-00158 X1 SPINNER LOG 28 -Oct -12 1 CD 3-31/K-32 CBTY-00006 MEMORY CROSS FLOW 24 -Oct -12 1 1 CD Z-69 BZ81-00042 X X PPROF w/ GHOST 26 -Oct -12 1 1 CD 2-34/P-14 CDGM-00001 X1 USIT 8 -Oct -12 1 CD Z-69 BZ81-00039 X SCMT 21 -Oct -12 1 1 CD F-476 8CRC-00216 X SONIC SCANNER 6 -Oct -12 1 1 CD C -42A C600-00054 MEMORY PPROF GHOST 26 -Oct -12 1 1 CD MPE-03 CTBY-00005 X � MEMORY LDL 6 -Oct -12 1 1 CD MPB-20 CAIQ-00001 X USIT 8 -Oct -12 1 1 CD W-45 BCRC-00218 (PROF W/ WATER FLOW 27 -Sep -12 1 1 CD MPC -10 C2EW-00039 X MEMORY PPROF W/ DEFT 28 -Oct -12 1 1 CD —B -29A C0T4-00059 X [PROF W/ WATER FLOW 19 -Oct -12 1 1 CD B -29A COT4-00059 X X MEMORY (PROF 19 -Oct -12 1 1 CD MEMORY PPROF W/ GHOST I 19 -Oct -12 1 1 CD Please return a signed copy to: BP PDC 1-132-9. 900 E Benson Blvd Anchorage AK 99508 X Please return a signed copy to: DCS 2525 Gambell St, Suite 400 Anchorage AK 99503 Stephanie Pacillo Data Manager Schlumberger Oilfield Services WIRELINE 2525 Gambell St, Ste. 400 Anchorage, AK 99503 W: Office: (907) 273-1770 DATE: 4 -Jan -13 TRANS#: 6243 .7MakanaK Bender Natural Resources Technician II .Alaska Oil & Gas Conservation Commission •, j 7 j •= rVi? S1llir 10 0 Fii;chG a _ l9C �Q '_ `e . All, NAME M -18B 14-098 Z-69 ORDER # ' CIUB-00045 C3NA-00037 8281-00042 DIST gIST X X X D'15T DIST SBHPS IBP/ LEAK DETECTION REVISION USIT/CBL LOGGED 11 -Dec -12 12 -Sep -12 8 -Oct -12 PRINTS 1 PRINTS 1 1 1 CD 1 CD _1C D N -23A J -07A BAUJ-00164 CSXI-00047 X X MEMORY (PROF MEMORY PPROF 23 -Nov -12 2 -Dec -12 1 1 1 CD 1 CD 5-128 L2-28 18-21A P-25 05-04A BAUJ-00161 CBAF-00029 BX69-00044 CIUB-00043 C5XI-00049 X X X X X MEMORY IPROF SBHPS LEAK DETECTION LOG LEAK DETECTION LOG IMEMORY PPROF 18 -Nov -12 12 -Dec -12 8 -Dec -12 19 -Nov -12 3 -Dec -12 1 1 1 1 1 1 CD 1 CD 1 CD 1 CD 1 CD MPB-03 C2JC-00061 X JXFLOW w IBP 20 -Oct -12 1 1 CD V-224 C3NA-00045 X WATER FLOW w IPROF 2 -Dec -12 1 1 CD f C f ^ X Please return a signed copy to BP PDC LR2-1 900 E Benson Blvd Anchorage AK 99508 Please return a signed copy to: Wireline 2525 Gambell St, Suite 400 Anchorage AK 99503 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED DEC 0 5 2012 WELL COMPLETION OR RECOMPLETION REPORT AND LC1T'�"��" 1a. Well Status: ® Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 1b. • 20AAC 25.105 20AAC 25.110 ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions One Well Class ❑ Exploratory ❑ Stratigraphic ® Development ❑ Service 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.: 12. 11/12/2012 Permit to Drill Number: 212-076 - 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded: 13. 9/17/2012 API Number: 50-029-23471-00-00 ° 4a. Location of Well (Governmental Section): Surface: 4433' FSL, 2672' FEL, Sec. 19, T11 N, R12E, UM Top of Productive Horizon: 2700' FSL, 2101' FEL, Sec. 18, T11 N, R12E, UM Total Depth: 2933' FSL, 2032' FEL, Sec. 18, T11 N, R12E, UM 7. Date T.D. Reached: 14. 10/4/2012 Well Name and Number: PBU Z-69 8. KB (ft above MSL): 96.11' 15. GL (ft above MSL): 56.1' Field / Pool(s) Prudhoe Bay / Prudhoe Bay 9. Plug Back Depth (MD+TVD) . 10933' 9116' 4b. Location of Well (State Base Plane Coordinates, NAD. Surface: x- 600003 y- 5959240 • Zone- ASP4 TPI: x- 600513 y- 5962794 Zone- ASP4 Total Depth: x- 600578 y- 5963028 Zone- ASP4 10. Total Depth (MD+TVD) 16. - 11021' 9196' Property Designation: ADL 028262 ' 11. SSSV Depth (MD+TVD) None 17. Land Use Permit: 19. Water depth, if offshore: N/A ft MSL 20. Thickness of Permafrost (TVD): 1784' 18. Directional Survey: ®Yes ❑ No (Submit electronic and printed information per 20 AAC 25.050) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD / GR / RES, MWD / GR / RES / NEU / DEN, USIT / CBL, MWD / GR / RES /NEU / DEN, 22. Re-Drill/Lateral Top Window MD/TVD: N/A 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# A-53 40' 120' 40' 120' 42" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 40' 3269' 40' 3170' 12-1/4" 1885 sx Dee Crete 432 sx Class'G' 7" 26# L-80 38' 10280' 38' 8545' 8-3/4" 595 sx LiteCrete 252 sx Class'G' 4-1/2" 12.6# 1 13Cr80 10102' 11019' 8400' 9194' 6-1/8" 1101 sx Class'G' 24. Open to production or injection? ® Yes ❑ No If Yes, list each interval open (MD+TVD of Top & Bottom, Perforation Size and Number): 2-7/8" Gun Diameter, 6 spf 10676'- 10686' 8886' - 8894' tt l}� 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER .SET MD /TVD 4-1/2", 12.6#, 13Cr80 10108' 9984'/ 8303' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. WAS HYDRAULIC FRACTURING USED DURING COMPLETION?[] Yes ® No DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w/ 75 Bbls of Diesel 27. PRODUCTION TEST Date First Production November 25, 2012 Method of Operation (Flowing, Gas Lift, etc Gas Lift ` Date of Test 11/21/2012 Hours Tested 12 Production For Test Period ♦ OIL -BBL: 728 GAS -MCF: 150 WATER -BBL: 182 CHOKE SIZE: 96 GAS -OIL RATIO: 205 Flow Tubing Press. 380 Casing Press: 1420 Calculated 24 -Hour Rate ♦ OIL -BBL: 1455 GAS -MCF: 299 WATER -BBL: 364 OIL GRAVITY -API (CORR): 28.1 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No . If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None F'SDMS DEC 0 6 2012 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE JZ _Z 12 �/�Submit Original Only 29. GEOLOGIC MARKERS (List all formations an, -kers encounter 30. FORMATION TESTS NAME lwU TVD Well Tested? Lj Yes ® No If yes, list intervals and formations tested, briefly summarizing test Permafrost Top 39' 39' results. Attach separate sheets to this form, if needed, and submit Permafrost Base 1859' 1823' detailed test information per 20 AAC 25.071. Ugnu 3278' 3179' None Schrader Bluff N 4514' 4360' Schrader Bluff O 4737' 4542' Base Schrader Bluff 5227' 4877' HRZ 7644' 6405' Kalubik 7896' 6604' Kuparuk C 7946' 6643' LCU 7999' 6685' Kuparuk A 8007' 6692' Miluveach 8083' 6752' Kingak 8834' 7351' Sag River 10287' 8550' Shublik 10324' 8580' Eileen 10452' 8689' Ivishak / Zone 4 10484' 8717' Ivishak / Zone 3 10700' 8907' Ivishak / Zone 2 10770' 8969' Formation at Total Depth: Ivishak / Zone 2 10770' 8969' 31. List of Attachment Summary of Daily Drilling Reports, Summary of Post -Rig Work, Well Schematic Diagram, Surveys 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ryan Ciolkosz, 564-5977: Ryan.Ciolkosz@bp.com Email: Joseph. Lastufka@bp.com Title: Drilling Technologist Printed Name:Joe Last fka Signature: Phone 564-4091 Date: I �' (.A MIAMEEMEA'A INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TRE£= 4-1/16" CNV WELLHEAD = FMC ACTUATOR= BAKERC WIAL KB. ELE 96.9 BF ELB/ = —561 ,k& KOP = .--..__ -._ 600 Max Angle = 58° @ 5476' Datum MD = 10688' ......._....._..--_.___- _........._...._.._..._....__ .. Datum TV D = .-- 8800' SS j 20" INSLLATED CON DLIC-TOR, -80 91.5#, A-53, U = 19.124" 9-5/8" CSG, 40#, L-80 BTC, ID = 8.835" 3269' Minimum ID = 3.725" @ 10096' 4-1/2" HES XN NIPPLE TOPOF4-1/2" LNR 10102' 1-1/2" TBG, 12.6#, 13CR-80 VAM TOP, 10107' 0152 bpf, D = 3.958" 7" CSG, 26#, L-80 VAM TOP HC, 10156' XO TO L-80 BTC, D =????? 7" CSG, 26#, L-80 VAM TOP HC, 10280' 0383 bpf, ID = 6.276" PERFORATION SUMMARY REF LOG: SLB MVVD FIELD LOG ON 10105/12 ANGLE AT TOP PERF: 28" Q 10676' Note: Refer to Production DB for historical pert data SIZE SPF I NTEWAL Opn/Sqz I DATE T SOZ 2-71ir 1 6 110676 - 106861 O 11/12/12 PBTD 10933' 4-112" LNR, 12.6#, 13CR-80 VAM TOP, 11019` .0152 bpf, D = 3.958" SAFE JTES: 4-112" CHROME TBG& LNR*** 1998' - 4-1/2" HES X NIP, D = 3.813" GAS LIFE MANDRELS ST MD I TVD DEV TYPE VLV LATCH PORT DATE. 8 3103 3004 8 KBG2 DOKE BK 12 11/10/12 7 4674 4492 37 KBG2 DMY BK 0 11/10/12 6 6328 5503 55 KBG2 DOME BK 16 11/10/12 5 7151 6019 40 KBG2 DMY BK 0 10/08/12 4 7758 6495 38 KBG2 DMY BK 0 10/08/12 3 8534 7111 39 KBG2 DOME BK 16 11/10/12 2 9274 7715 34 KBG2 DMY BK 0 10/08/12 1 9921182521 34 jKBG2 SO BK 1 22 11/10/12 9955' 4-112" HES X NIP, D = 3.813' 9984` 7" X 4-112" HES TNT WMt D = 3.856" 10x19' 4 112" HIsS X NP, D = 3.813" 10096' -j4-1/2" HES XN NP, D = 3.725" 101 OZ' 7" X 5" BKR TIEBACK SLV, D = ? 10108' 4-v2" WLEG, D=x.100" ETMD TT NOT LOGGED 10112' 7" X 5" BKR ZXP LTP, ID = 4250" 10123' 7" X 5" BKR FLEX LOCK HGP, ID = 4.320" 10134' 5" X —4 -1/2 -XO, D= 3.900" 10690' 1-{4-1/2" MAKER PUPJONT DATE REV BY COMMENTS DATE REV BY COMMENTS 10/11112 NORDIC 1 INTIAL COMPLETION 12/04/12 JU PJC CONDUCTOR DEPTH 10/11/12 PJC DRLG HO CORRECTIONS 10/13/12 PJC DRLG DRAFT CORRECTIONS 11/12/12 DAS/PJC PERFORATION REMOVED 11/12/12 DAS/PJC GLV CIO (11/10/12) 11/13/12 JCMi PJC ADFERFS (11/12/12) PRIDHOE BAY LUT VVB.L: Z-69 PERMIT No. F2120760 AR W.- 50-029-23741-00 SEC 19, T11K RUE, 848' FND & 2281' FVVL BP Exploration (Alaska) Page 1 of 1 BP AMERICA LOT / FIT Summary Well Name: Z-69 Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 09/23/12 LOT 3,269.00 3,176.00 9.30 1,085.00 2,619.40 15.88 10/03/12 LOT 10,306.00 8,545.00 8.80 1,023.00 4,929.30 11.10 Page 1 of 1 North America - ALASKA - BP Page 1 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C: DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/15/2012 00:00 - 01:00 1.00 MOB P PRE PREP AND SCOPE DERRICK 01:00 - 02:00 1.00 MOB P PRE SECURE DERRICK -PIN BLOCKS AND TOP DRIVE -SPOOL DRILLING LINE 02:00 - 05:00 3.00 MOB P PRE MOVE AND STAGE CASING SHED, MOTOR, PUMP, AND PIT MODULES FOR TRUCKS 05:00 - 06:30 1.50 MOB P PRE LOWER CATTLE CHUTE. REMOVE DERRICK CLIMBER. SECURE DERRICK 06:30 - 10:30 4.00 MOB P PRE PREP AND SKID RIG FLOOR. CONTINUE STAGING MODULES FOR TRUCKS. 10:30 - 11:30 1.00 MOB P PRE LOWER DERRICK INTO POSITION. SECURE DERRICK 11:30 - 12:00 0.50 MOB P PRE PREP TO MOVE PIPE SHED AND SUB 12:00 - 16:30 4.50 MOB P PRE MOVE PIPE SHED OUT FROM SUB - USE TRUCK TO STAGE PIPESHED FOR STOMPER REPAIR 16:30 - 18:30 2.00 MOB P PRE MOVE AND SPOT SUB ON RIG MATS AT WELL Z-69 18:30 - 19:30 1.00 MOB P PRE SPOT PIT MODULE. MOVE SUB FORWARD TO ACCOMODATE CRANE PICK. CONTINUE REPAIR ON PIPE SHED STOMPER 19:30 - 22:00 2.50 MOB P PRE PJSM WITH RIG CREW, BP WSL, BP HSE ADVISOR, DDI SAFETY REP AND CRANE CREW. PERFORM CRITICAL (BLIND) LIFT OF SURFACE ANNULAR CARRIER TO BOP DECK WITH CRANE COMPLETE STOMPER REPAIR 22:00 - 00:00 2.00 MOB P PRE SPOT SUB OVER WELL. 9/16/2012 00:00 - 05:00 5.00 MOB P PRE FINISH SPOTTING CASING MODULE TO Z-69 05:00 - 07:00 2.00 MOB P PRE PREP AND RAISE DERRICK. SPOT CASING SHED 07:00 - 12:00 5.00 MOB P PRE SKID RIG FLOOR. SPOT PIT PUMP AND POWER MODULES. INSTALL PAD EYES AND CUT ACCESS FOR JIB CRANE REMOVAL. 12:00 - 13:00 1.00 MOB P PRE LOWER C-SECTION, CONITINUE CONNECTING ALL ELETRICAL AND SERVICE LINES. 13:00 - 16:30 3.50 MOB P PRE CHANGE OUT DERRICK LIGHT. PREP JIB CRANE BASE FOR CUT. C/O MAIN STEAM LINE VALVE. 16:30 - 19:00 2.50 MOB P PRE SPOOL UP EXCESS DRILLING LINE ON DRUM, SCOPE DERRICK. 19:00 - 00:00 5.00 RIGU P PRE NU SURFACE ANNNULAR AND RISER TO DIVERTER TEE BEGIN MAKING UP DIVERTER LINE - BEGIN TAKING ON DRILLPLEX MUD TO PITS ACCEPT RIG ON 9/16/12 AT 19:00 HRS Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 2 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3-01285-C: DRILL (8,454,681.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:00AM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/17/2012 00:00 - 03:30 3.50 RIGU P PRE CONTINUE N/U DIVERTER EQUIPMENT - INSTALL 20" RISER, CLEAN AND INSPECT MUDPUMPS - INSTALL PS-21 SLIPS, FLOWLINE, AND JET LINES 03:30 - 08:00 4.50 RIGU P PRE CONTINUE N/U DIVERTER LINE INSTALL SLIP INSERTS, SEAL FLOW BOX FILL SURFACE LINES AND PRESSURE TEST TO 250 / 3500 PSI (GOOD) FUNCTION TEST ANNULAR PREVENTER & KNIFE VALVE KNIFE VALVE FULLY OPEN 13 SECS ANNULAR PREVENTER CLOSED IN 29 SEC CHUCK SCHEVE OF AOGCC WAIVED WITNESS OF DIVERTER TEST 08:00 - 09:00 1.00 RIGU P PRE R/U HES E-LINE WITH GYRODATA GYRO 09:00 - 11:00 2.00 RIGU P PRE P/U BHA COMPONENTS XO'S SUBS & BIT - 4" HWDP FROM SHED AND STD BACK IN DERRICK 11:00 - 12:00 1.00 RIGU P PRE LOAD MUD MOTOR & P/U LIFT SUBS 12:00 - 14:00 2.00 RIGU P PRE M/U 12.25" SURFACE BHA #1 14:00 - 14:30 0.50 RIGU P PRE RIG EVACUATION DRILL. ALL PERSONS ACCOUNTED FOR 14:30 - 15:30 1.00 RIGU P PRE HOLD PRE-SPUD WITH RIG CREW 15:30 - 17:00 1.50 RIGU P PRE RIH AND TAG @ 122', DISPLACE WELL WITH 8.6 PPG DRILLPLEX MUD - SIMOPS: RE-POSITION AND WIRE CAMERA IN DERRICK FOR DRILLING ON DOUBLES 17:00 - 00:00 7.00 DRILL P SURF DRILL 12-1/4" SURFACE HOLE FROM 122' MD TO 313' MD - RUN GYRO SURVEY AT EVERY CONNECTION - 480 GPM, 470 PSI - 40 RPM, TO = 12 K, -WOB=5-7K - P/U WT = 50k - S/O WT = 50K. AST = 0.69 HRS, ADT = 2.35 HRS, ART = 1.66, TOTAL BIT HRS. = 2.35 9/18/2012 00:00 - 06:30 6.50 DRILL P SURF DRILL 12-1/4" SURFACE HOLE F/ 313' MD T/ 720' MD / 719' TVD - RUN GYRO SURVEY AT EVERY CONNECTION 635 GPM, 1140 PSI 40 RPM, TO = 2K-4K, WOB=18K P/U WT = 74k S/O WT = 70K. AST = 0.79 HRS ,ART = 4.79, ADT = 5.58 HRS, TOTAL BIT HRS. = 2.35 06:30 - 07:30 1.00 DRILL P SURF POH F/ 720' MD T/ 131' MD Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 3 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 IX3-01285-C: DRILL (8,454,681.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) _ LD BHA #1 07:30 08:30 1.00 DRILL P SURF - L/D UBHO AND XO - B/O USED 12.25" VM -3 BIT BIT GRADE: 4 -4 -SS -A -E -WT -BHA 08:30 - 10:00 1.50 DRILL P SURF P/U BHA #2 W/ NEW 12.25" VM -3 BIT T/ 283' MD 10:00 - 11:00 1.00 DRILL P SURF TIH W/ 4" HWDP F/ 283'MD T/ 650' MD 11:00 - 12:00 1.00 DRILL P SURF CORRELATE SURVEYS BETWEEN GYRO AND MWD F/ 50' MD T/ 720' MD 12:00 12:30 0.50 DRILL P SURF GREASE / INSPECT TOP DRIVE 12:30 00:00 11.50 DRILL P SURF DRILL 12-1/4" SURFACE HOLE F/ 720' MD T/ 1,251' MD / 1,247' TVD, DRILL 12-1/4" SURFACE HOLE F/ 720' MD T/ 1,251' MD / 1,247' TVD - 625 GPM, 1430 PSI - 40 RPM, TO = 4K - WOB =25K - P/U WT = 78k - S/O WT = 80K. AST = 4.07 HRS , ART = 0. 84, ADT = 4.91 HRS, TOTAL BIT HRS. = 4.91 9/19/2012 00:00 - 05:30 5.50 DRILL P SURF DRILL 12 1/4" SURFACE HOLE FROM 1,251' MD TO 1,881' MD - 636 GPM, 1,870 PSI - 40 RPM, TO = 5K, - WOB = 27K - P/U WT = 98K, S/O WT = 91 K 05:30 - 06:30 1.00 DRILL P SURF CBU WHILE ROTATING & RECIPROCATE - 553 GPM, 1,300 PSI - 40 RPM, TO = 2K - P/U WT = 98K, S/O WT = 91 K - TOTAL STROKES PUMPED = 6,900 06:30 - 08:00 1.50 DRILL P SURF MONITOR WELL (STATIC) - MW IN 9.2PPG - MW OUT 9.2PPG POOH ON ELEVATORS FROM 1,881' MD TO 650' MD. MONITOR DISPLACEMENT VIA TRIP 'TANK. RIH WITH DOUBLES FROM SHED FROM 650' MD TO 1,881' MD 08:00 - 12:00 4.00 DRILL P SURF DRILL 121/4" SURFACE HOLE FROM 1,881' MD TO 2,642' MD 750 GPM, 2,900 PSI 40 RPM, TQ = 5-6K, WOB = 28K P/U WT = 103K, S/O WT = 94K. ROT WT = 101K ART = 4.23 HRS, ADT = 5.99 HRS, TOTAL BIT HRS. = 10.9 Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 4 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM !Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 20:00 8.00 DRILL P SURF DRILL 12 V4" SURFACE HOLE FROM 2-642' MD TO TD 3,275' MD / 3,176' TVD - 748 GPM, 2970 PSI - 40 RPM, TO = 5-6K - WOB = 27K - P/U WT = 120K, S/O WT =106K. ROT WT =116K AST- 1.85 HRS, ART = 1.87 HRS, ADT = 3.73 HRS, TOTAL BIT HRS. = 3.73 20:00 22:00 2.00 DRILL P SURF CBU WHILE ROTATING & RECIPROCATE - 655 GPM, 2,190 PSI - 40 RPM, TQ = 2K - P/U WT = 98K, S/O WT = 91 K - TOTAL STROKES PUMPED =15,450 22:00 - 23:30 1.50 DRILL P SURF MONITOR STATIC WELL FOR 10 MIN - STABLE FLUID COLUM POOH ON ELEVATORS TO 2,175 ' MD, 35K OVERPULL AT 2,179' MD - UNABLE TO PULL THRU OBSTRUCTION AT 2,179' MD W/ 35K OVERPULL -P/U WT=110K - S/O WT = 81 K 23:30 - 00:00 0.50 DRILL P SURF BACKREAM OOH FROM 2,200' MD TO 2,010' MD 560 GPM, 1,400 PSI - 40 RPM 9/20/2012 00:00 - 03:00 3.00 DRILL P SURF WIPER TRIP TO BASE OF PERMAFROST AT 1,700' MD. BACKREAM TIGHT SPOT 2,179' MD. RIH, CIRCULATE 2 BU TO CONDITION HOLE. POOH. 03:00 - 05:00 2.00 DRILL P SURF POOH ON ELEVATORS. NO TIGHT SPOTS ENCOUNTERED. 05:00 - 07:30 2.50 DRILL P SURF LD 12 JTS OF 4" HWDP. STAND BACK 1 STD OF 4" HWDP. DC'S. BREAKOUT BIT. BIT GRADE: 3 -5 -WT -2 -E -1 -SS -TD 07:30 - 08:30 1.00 DRILL P SURF CLEAN AND CLEAR RIG FLOOR 08:30 - 09:30 1.00 CASING P SURF RU TO RUN 9-5/8" SURFACE CASING 09:30 - 10:30 1.00 CASING P SURF PERFORM DUMMY HANGER RUN W/ HANGER AND LANDING JNT. 10:30 - 12:00 1.50 CASING P SURF PJSM WITH ALL PERSONNEL FOR RUNNING 9-5/8" SURFACE CASING. P/U 9-5/8" 40 LB -FT L-80 BTC SHOETRACK. BAKERLOCK SAME AND TORQUE TO MARK. - PUMP AND ENSURE FLOATS CLEAR, P/U AND VERIFY FLOATS HOLD. 12:00 - 21:30 9.50 CASING P SURF RIH W/ 9-5/8", L-80,40#, BTC -M SURFACE CASING F/ 450' MD T/ 3,225' MD, - FILL EVERY JNT - BREAKING CIRCULATION EVERY 10 JNTS AT 5 BPM, 150 PSI - WORK THROUGH OBSTRUCTION AT 2,123' MD 2,160'MD - CONT RIH PUMPING IN EACH JNT DOWN AT 5 BPM Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 5 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3 -01285-C: DRILL (8,454,681.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 22:00 0.50 CASING P SURF CIRCULATE AND RECIPROCATE F/ 3,225' MD TO 3,205' MD - 5 BPM, 150 PSI 22:00 - 22:30 0.50 CASING P SURF MU HANGER AND LANDING JNT. LAND CASING AT 3,269. 22:30 - 00:00 1.50 CASING P SURF CIRCULATE AND RECIPROCATE CASING F/ 3,269' MD T/ 3,259' - 6 BPM, 180 PSI - CBU 2X BEFORE CONDITIONING MUD 9/21/2012 00:00 - 03:30 3.50 CASING P SURF CONTINUE TO CIRCULATE AND CONDITION MUD TO 15 LSYP - 5 -BPM, 120 -PSI. - LAY DOWN CASING EQUIP. NOT NEEDED ON FLOOR - PJSM WITH ALL PERSONNEL INVOLVED WITH SURFACE CEMENT OPERATIONS. 03:30 - 05:00 1.50 CASING P SURF CONTINUE TO CIRCULATE AND CONDITION MUD FOR CEMENT JOB. - FINAL LSYP = 15 05:00 - 09:00 4.00 CEMT P SURF CEMENT 9 5/8" SURFACE CASING AS FOLLOWS: - PJSM FOR 9-5/8" CEMENTING WITH SCHLUMBERGER AND CH2MHILL LINE UP TO SCHLUMBERGER CEMENTERS. - PUMP 5-BBLS OF WATER, TEST LINES TO 250 / 3500 PSI, 5 -MINUTES EACH, GOOD TEST. - PUMP 100 BBLS OF 11.0- PPG MUDPUSH . TEST FIELD SAMPLE AS PER PROCEDURE. - DROP BOTTOM PLUG - PUMP 624.3-BBLS (1885 SX) 11.0 -PPG LEAD DEEPCRETE CEMENT. YIELD 1.83 CUFT/SK - PUMP 89.3-BBLS 43L 2 SX) 15.8 -PPG CLAS-S— LAS"G" "G"TAIL CEMENT. YIELD 1.16 CUFT/SK - DROP TOP PLUG. KICK OUT PLUG WITH 10-BBLS OF WATER. - RECIPROCATE AND ROTATE UNTIL 125K OVERPULL - MAX SURFACE PRESSURE= 2500 PSI, MAX RATE= 6 BPM DISPLACE WITH 9.2 PPG DRILPLEX PLUG BUMPED ON STROKES AT 2 BPM, HOLD 500 PSI OVER CHECK FLOATS, FLOATS HELD 140 BBLS OF CEMENT TO SURFACE. - ** CEMENT IN PLACE 08:30 -HRS." 09:00 10:30 1.50 CEMT P SURF FLUSH SURFACE LINES, BLOW DOWN SURFACE EQUIPMENT. RID VOLANT TOOL AND CEMENT SWIVEL. 10:30 16:00 5.50 WHSUR P SURF N/D DIVERTER EQUIPMENT - ND RISER, KNIFE VALVE AND SURFACE TEE INSTALL FMC CASING AND TUBING SPOOL - PRESSURE TEST WELLHEAD FOR TO 250/5000 PSI LO/HI FOR 5/30 CHARTED MINS - NU RISER AND BOPE 16:00 - 00:00 8.00 BOPSUR P SURF INSTALL 13-3/8" X 11" ADAPTOR SPOOL, OFFSET DSA, HIGH PRESSURE RISER. - INSTALL AND CLEANOUT JOES BOX, FLOW LINE, CHOKE, KILL AND HOLE FILL LINES MU 4-1/2" FOSV, XO AND DART VALVE Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 6 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/22/2012 00:00 - 02:30 2.50 BOPSUR P SURF CONT N/U BOPE. . INSTALL STRIP-O-MATIC, SLIPS, AND ELEVATORS. PU 4" TEST JNT AND INSTALL BOP TEST PLUG. RU TEST PLUG. FLUID PACK BOPE. PERFORM BOP BODY TEST 02:30 - 07:30 5.00 BOPSUR P SURF TEST BOPE PER BP/AOGCC/DDI REQUIREMENTS TO 250 -PSI LOW / 3500 -PSI HI. TESTED 2-7/8" X 5-1/2" UPPER VBR'S AND LOCKS, 2-7/8" X 5-1/2" LOWER VBR'S AND LOCKS WITH 4" & 5" TEST JT. TESTED BLIND SHEAR RAMS 250 -PSI LOW / 3500 -PSI HI, 2 EA. OF 4-1/2" IF FOSV'S, 1 EA. OF 4" DART VALVE & FOSV. TESTED CHOKE MANIFOLD VALVES 1-15, CHOKE AND KILL MANUAL & HCR VALVES, 4" KILL LINE VALVE & UPPER AND LOWER TOP DRIVE IBOP'S. TESTED MANUAL AND SUPER CHOKES TO 250 -PSI LOW / 3500 -PSI FOR 5 CHARTED MINUTES EACH TEST. TESTED ANNULAR PREVENTER WITH 4" TEST JT. 250 -PSI LOW / 3500 -PSI HI. CHARTED ALL HI AND LO TESTS FOR 5 -MINUTES EACH. PERFORMED ACCUMULATOR DRAWDOWN TEST: - ACCUMULATOR PSI = 3050, MANIFOLD PSI = 1450 - ACCUMULATOR PSI AFTER FUNCTIONING BOPE = 1700 -PSI - RECOVERY TO FULL SYSTEM PRESSURE _ 113 SECONDS. - 6 NITROGEN BOTTLES AVERAGE PRESSURE = 2060 -PSI REFERENCED DDI BOP TESTING SOP FOR ALL TESTING. AOGCC (LOU RIMALDI) WAIVED WITNESS. BOPE TEST WITNESSED BY DOYON TOOLPUSHER- JUSTIN HAYES, AND BP WSL-ANTHONY KNOWLES 07:30 - 08:00 0.50 BOPSUR P SURF R/D BOP TEST EQUIPMENT, PULL TEST PLUG. P/U WEAR RING. 08:00 - 08:30 0.50 CASING P SURF R/U TO TEST CASING 08:30 - 10:00 1.50 CASING P SURF TEST 9-5/8 SURFACE CASING. 250 PSI LOW FOR 5 MINS/ 3500 PSI HI FOR 30 MIN CHART TESTS. TEST CRITERIA PASSING. AUTHORIZATION TO PROCEED GRANTED BY WTL- ALAN MADSEN FOR MIKE SCHULTZ ROTARY WTL 10:00 - 11:00 1.00 CASING P SURF CLEAN & CLEAR RIG FLOOR. P/U BHA SUBS & XO'S 11:00 - 12:00 1.00 CASING P SURF P/U BHA #3 AS PER DD TO 51' MD. -8.75" DP606 PDC BIT, 6X13, 0.778=TFA PDM @ 1.5° MWD: PWD/DIR/GR/RES/DENSITY/NEUTRON 12:00 - 15:00 3.00 CASING P SURF CONT P/U BHA AS PER DD FROM 51' TO 942' MD. MONITOR DISPLACEMENT - VIA TRIP TANK 15:00 15:30 0.50 CASING P SURF C/O INSERTS FROM HAND SLIP INSERTS TO 4" INSERTS. Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 7 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3-01285-C: DRILL (8,454,681.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 16:00 0.50 CASING P SURF SHALLOW HOLE TEST MWD @ 400 GPM 1100 PSI 16:00 - 16:30 0.50 CASING P SURF PRE SPUD MEETING W/ WSL, DDI TP, ON SITE GEO, & RIG CREW. 16:30 - 19:00 2.50 CASING P SURF PJSM. CUT AND SLIP 160' DRILL LINE. 19:00 - 20:00 1.00 CASING P SURF - SERVICE TOP DRIVE 20:00 - 00:00 4.00 CASING P SURF RIH FROM 942' MD TO 3,095' MD. 9/23/2012 00:00 - 02:00 2.00 CASING P SURF DRILL 10' FROM 9-5/8" SHOE TRACK. TAG CEMENT AT 3,130' MD 560 GPM, 2470 PSI 40 RPM, 5K-TQ 5K WOB 02:00 - 03:00 1.00 CASING P SURF DISPLACE WELL TO 9.0 PPG LSND WHILE RECIPROCATING AND ROTATING 03:00 - 05:30 2.50 CASING P SURF DRILL 20' SHOE TRACK. PU INTO 9-5/8" SHOE. CBU. PERFORM 9-5/8" LOT. - 0.5 BPM, BROKE OVER AT 750 PSI, CONT TO PUMP 1-BBL - TOTAL BBLS PUMPED 2.2 BBLS - BLED BACK = 0.5 BBLS - EMW = 15.57 PPG (ATTACHED LOT RESULTS TO OPENWELLb) - RIG DOWN TEST EQUIPMENT, B/D KILL LINE 05:30 - 06:00 0.50 DRILL P INTI ESTABLISH ECD BASELINE AND DRILLING PARAMETERS. 06:00 - 12:00 6.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM . 3,295' MD TO 3,916' MD (3,843' TVD) - 587 GPM, 2,090 PSI ON/ 1,780 PSI OFF - 80 RPM, TQ = 7-8K ON / 5K OFF - WOB = 10K -MW=9.0PPG - ECD = 9.94 PPG (CALC ECD = 9.44 PPG) - P/U = 148K, S/O = 118K, ROT = 128K AST = 1.86 HRS, ART = 1.62, ADT = 3.48 HRS TOTAL BIT HRS = 3.63, TOTAL JAR HRS = 23.7 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 3,250' MD (3,150' TVD) -TIME= 02:30, MW = 9.0 PPG #1 MP - 20/30 SPM = 220 / 260 PSI #2 MP - 20/30 SPM = 220 / 260 PSI 12:00 - 00:00 12.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 3,295' MD TO 4906" MD (4667' TVD) 580 GPM, 2,200 PSI ON / 2,050 PSI OFF 80 RPM, TO = 7-8K ON / 5K OFF WOB = 5-8K MW = 9.0 PPG ECD = 9.76 PPG (CALC ECD = 9.2 PPG) P/U = 155K, S/O = 125K, ROT =137K AST = 1.8 HRS, ART = 3.18, ADT =4.98 HRS TOTAL BIT HRS = 8.46, TOTAL JAR HRS = 28.7 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 4840' MD (4622 TVD) - TIME = 23:00, MW = 9.0 PPG #1 MP - 20/30 SPM = 220 / 280 PSI #2 MP - 20/30 SPM = 220 / 280 PSI Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 8 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/24/2012 00:00 - 12:00 12.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 4,840' MD TO 6,298' MD - 587 GPM, 2,850 PSI ON / 2,630 PSI OFF - 100 RPM, TQ = 8K ON / 7K OFF - WOB = 12K - MW = 9.5 PPG - ECD = 10.40 PPG (CALC ECD = 9.71 PPG) - P/U = 165K, S/O = 122K, ROT = 137K AST = 1.56 HRS, ART = 5.38, ADT = 6.94 HRS TOTAL BIT HRS = 15.4, TOTAL JAR HRS = 35.7 TOTAL LOSSES FOR LAST 12 HRS = 0 BBLS SPR'S: 5,666' MD (5,116' TVD) - TIME = 06:30, MW = 9.3 PPG #1 MP - 20/30 SPM = 280 / 340 PSI #2 MP - 20/30 SPM = 280 / 340 PSI SPR'S: 6,298' MD (5,480' TVD) - TIME = 11:30, MW=9.5PPG #1 MP - 20/30 SPM = 280 / 340 PSI #2 MP - 20/30 SPM = 280 / 340 PSI 12:00 - 00:00 12.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 6,298' MD TO 7,165' MD - 587 GPM, 3,546 PSI ON/ 3,334 PSI OFF - 100 RPM, TQ = 9K ON / 7K OFF - WOB = 10-14K - MW = 10.4 PPG - ECD = 10.42 PPG (CALC ECD = 10.94 PPG) - P/U = 191 K, SIO = 120K, ROT = 151 K AST = 1.66 HRS, ART = 5.29, ADT = 6.95 HRS TOTAL BIT HRS = 22.35, TOTAL JAR HRS = 42.2 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 6,737' MD (5,735' TVD) - TIME = 16:00, MW = 10.4 PPG #1 MP - 20/30 SPM = 320 / 420 PSI #2 MP - 20/30 SPM = 320 / 420 PSI Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 9 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/25/2012 00:00 07:30 7.50 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 7,165' MD TO 7,345' MD 6163' TVD 587 GPM, 2,950 PSI ON/ 2,950 PSI OFF 100 RPM, TQ = 9K ON / 7K OFF WOB = 14-24K MW = 10.4 PPG - ECD = 11.15 PPG (CALC ECD = 10.94 PPG) - P/U = 210K, S/O = 127K, ROT = 151 K AST = 1.47 HRS, ART = 2.54, ADT = 4.01 HRS TOTAL BIT HRS = 26.01, TOTAL JAR HRS = 46.2 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 7,214' MD (6,050' TVD) - TIME = 00:30, MW=10.4 PPG #1 MP - 20/30 SPM = 340 / 440 PSI #2 MP - 20/30 SPM = 340 / 440 PSI SPR'S: 7,345' MD (6,163' TVD) - TIME = 07:30, MW = 10.4 PPG #1 MP - 20/30 SPM = 220 / 280 PSI #2 MP - 20/30 SPM = 220 / 260 PSI 07:30 - 08:00 0.50 DRILL N DFAL 7,345.00 INTI DISCUSSION WITH TOWN FOR A BIT TRIP DUE TO SLOW ROP THROUGH THE CM1 - DECISION WAS MADE TO TRIP OUT AND CHECK SIGN OF - MONITOR WELL PRIOR TO LEAVING - BOTTOM- WELL STATIC - MW 10.4 PPG INIOUT 08:00 - 12:00 4.00 DRILL N DFAL 7,345.00 INT1 POOH F/ 7,345' TO 942' ON 4" DP RACKING BACK IN DERRICK MONITORING TRIP VIA TRIP TANK MONITOR THE HOLE PRIOR TO PULLING BHA THROUGH THE STACK - WELL STATIC - STAND BACK HWDP TO 191', STAND BACK COLLARS 12:00 - 14:30 2.50 DRILL N DFAL 7,345.00 INT1 L/D 8-3/4" BHA #3 FROM 191' MD TO SURFACE - PJSM WITH SLB MWD AND DD ON REMOVING RA SOURCE REMOVE NUCLEAR SOURCES AT 1 00'MD MONITOR WELL ON TRIP TANK WASH OUT FOUND IN MWD TELESCOPE 4-5-RO-S-X-2-PN-ROP 14:30 - 15:00 0.50 DRILL N DFAL 7,345.00 INT1 CLEAN & CLEAR RIG FLOOR - PREP FOR NEXT BHA RUN 15:00 - 16:00 1.00 DRILL N DFAL 7,345.00 INT1 P/U BHA #4 AS PER DD TO 98' MD. -8.75" HYCALOG DTX619 PDC BIT, 6X13, 0.778=TFA PDM 675XP @ 1.5° MWD: PWD/DIR/GR/RES/DENSITY/NEUTRON 16:00 - 18:00 2.00 DRILL N DFAL 7,345.00 INTI PJSM WITH CREW AND MWD FOR LOADING THE SOURCE -CONT P/U BHA AS PER DD FROM 98' TO 942' MD. -MONITOR DISPLACEMENT - VIA TRIP TANK -SHALLOW HOLE TEST MWD @ 508 GPM 1230 PSI C/O PS21 SLIP INSERTS TO 4" Printed 11/29/2012 5:00:56PM North America - ALASKA -'BP Page 10 of 22' Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3 -01285-C: DRILL (8,454,681.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 22:00 4.00 DRILL N DFAL 7,345.00 INT1 TIH ON ELEVATORS W/ 4" DP FROM THE DERRICK - F/ 942' TO 6,262' FILLING PIPE EVERY 20 STANDS - ENCOUNTERED TIGHT SPOT AT 6,262' SLACKED OFF TO BLOCK WEIGHT. - PU TO 6,250', MU TOP DRIVE AND WASHED AND REAMED TO 6,357' - RPM -20 ,SPM -210, PUW-200K , SOW -118K 22:00 - 23:00 1.00 DRILL N DFAL 7,345.00 INTI CONT TIH ON ELEVATORS F/ 6,357' MD TO 7,130' - MONITORING TRIP VIA TRIP TANK 23:00 - 00:00 1.00 DRILL N DFAL 7,345.00 INT1 ENCOUNTERED TIGHT SPOT AT 7,130' SLACKED OFF TO BLOCK WEIGHT. - PU TO 7,119', MU TOP DRIVE AND WASHED AND REAMED TO 7,345' - RPM -20-80 ,SPM -480, PUW-200K , SOW -118K 9/26/2012 00:00 12:00 12.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 7,345' MD TO 8,253' MD 6,886' TVD 550 GPM, 3850 PSI ON/ 3430 PSI OFF 100 RPM, TQ = 13-14K ON/ 9K OFF WOB = 10-12 K - MW = 10.5 PPG - ECD = 11.19 PPG (CALC ECD = 10.94 PPG) P/U = 235K, SIO = 128K, ROT = 158K AST = .45 HRS, ART = 7.76, ADT = 8.21 HRS TOTAL BIT HRS = 26.01, TOTAL JAR HRS = 54.4 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 7,398' MD (6,203' TVD) - TIME = 01:10, MW = 10.5 PPG #1 MP - 20/30 SPM = 340 / 440 PSI #2 MP - 20/30 SPM = 320 / 420 PSI SPR'S: 7,869' MD (6,582' TVD) - TIME = 07:15, MW = 10.4 PPG #1 MP - 20/30 SPM = 320 / 420 PSI #2 MP - 20/30 SPM = 320 / 420 PSI 12:00 14:00 2.00 DRILL P INTI DRILL 8-3/4" INTERMEDIATE HOLE FROM 8,253' MD TO 8,415' MD 7,016' TVD 550 GPM, 3850 PSI ON / 3430 PSI OFF 100 RPM, TQ = 13-14K ON/ 9K OFF WOB = 10-12 K MW = 10.5 PPG ECD = 11.19 PPG (CALC ECD = 10.94 PPG) P/U = 235K, S/O = 128K, ROT = 158K TOTAL LOSSES= 0 BBLS 14:00 - 15:00 1.00 DRILL N DFAL 8,415.00 INT1 TROUBLE SHOOTING MWD ISSUES 15:00 - 22:00 7.00 DRILL N DFAL 8,415.00 INT1 MONITOR THE HOLE PRIOR TO POOH- WELL STATIC POOH STANDING BACK F/ 8,415' TO 942' ON 4" DID, STAND BACK HWDP TO 191' - MONITORING TRIP VIA TRIP TANK - MONITOR THE HOLE PRIOR TO PULLING BHA THROUGH THE STACK - WELL STATIC STAND BACK HWDP TO 191', STAND BACK COLLARS Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 11 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 DRILL N DFAL 8,415.00 INT1 L/D 8-3/4" BHA #4 FROM 191' MD TO SURFACE - PJSM WITH SLB MWD AND DD ON REMOVING RA SOURCE REMOVE NUCLEAR SOURCES MONITOR WELL ON TRIP TANK 1-1-CT-G-X-1-NO-DTF MWD FAILURE CAUSE NOT EVIDENT ON SURFACE, SLB IS INVESTIGATING THE FAILURE 9/27/2012 00:00 - 01:00 1.00 DRILL N DFAL INT1 P/U BHA #5 AS PER DD TO 98' MD - 8.75" HYCALOG DTX 619 PDC BIT, 6X13, 0.778=TFA POWER DRIVE MOTOR 675XP @ 1.5° CHANGE OUT ALL MWD TOOLS, RUN SAME MOTOR AND BIT - MWD: PWD/DIR/GR/RES/DENSITY/NEUTRON 01:00 - 03:00 2.00 DRILL N DFAL INT1 PJSM WITH CREW AND MWD FOR LOADING THE SOURCE -CONT P/U BHA AS PER DD FROM 98' TO 942' MD. -MONITOR DISPLACEMENT - VIA TRIP TANK -SHALLOW HOLE TEST- GOOD MWD @ 462 GPM 1217 PSI C/O PS21 SLIP INSERTS TO 4" 03:00 - 07:00 4.00 DRILL N DFAL INTI TIH ON ELEVATORS W/ 4" DP FROM THE DERRICK - F/ 942' TO 8,415' FILLING PIPE EVERY 20 STANDS MONITOR DISPLACEMENT - VIA TRIP TANK OBTAIN SPR'S, DRILLING PARAMETERS ADN ECD BASELINES 07:00 - 12:00 5.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 8,415' MD TO 8,826' MD 7,343' TVD 550 GPM, 3700 PSI ON / 3460 PSI OFF 100 RPM, TO = 13-14K ON/ 9K OFF WOB = 10-12 K MW = 10.4 PPG ECD = 11.29 PPG (CALC ECD = 11.04 PPG) P/U = 260K, SIO = 128K, ROT = 164K AST =.92 HRS, ART = 2.5, ADT = 3.42 HRS TOTAL BIT HRS = 3.42, TOTAL JAR HRS = 59.2 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 8,415" MD (7,016' TVD) - TIME = 07:00, MW = 10.4 PPG #1 MP - 20/30 SPM = 320 / 420 PSI #2 MP - 20/30 SPM = 320 / 420 PSI Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 12 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 00:00 12.00 DRILL P INTI DRILL 8-3/4" INTERMEDIATE HOLE FROM TO 8,826' MD TO9,675 MD, 8,050' TVD 550 GPM, 3870 PSI ON / 3670 PSI OFF 100 RPM, TQ = 15-17K ON/ 14K OFF -WOB=6K -MW=10.4 PPG ECD = 11.29 PPG (CALC ECD = 11.04 PPG) P/U = 260K, S/O = 140K, ROT = 178K AST = 1.14 HRS, ART = 6.28, ADT = 7.42 HRS TOTAL BIT HRS = 10.84, TOTAL JAR HRS = 66.6 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 8920" MD (7,419' TVD) - TIME = 14:00, MW = 10.4 PPG #1 MP - 20/30 SPM = 350 / 450 PSI #2 MP - 20/30 SPM = 340 / 440 PSI SPR'S: 9490" MD (7,860' TVD) - TIME = 21:30, MW = 10.4 PPG - #1 MP - 20/30 SPM = 360 / 470 PSI #2 MP - 20/30 SPM = 370 / 4600 PSI 9/28/2012 00:00 - 11:00 11.00 DRILL P INT1 DRILL 8-3/4" INTERMEDIATE HOLE FROM 10 050' MD,TO 10,286MD, 10,253' TVD 550 GPM, 3945 PSI ON / 3770 PSI OFF 100 RPM, TO = 13-14K ON / 11 K OFF -WOB=6K MW=10.4 PPG ECD = 11.12 PPG (CALC ECD = 11.00 PPG) P/U = 272K, S/O = 150K, ROT = 182K AST = .68 HRS, ART = 6.27, ADT = 6.95 HRS TOTAL BIT HRS = 24.74, TOTAL JAR HRS = 73.6 TOTAL LOSSES FOR LAST 24 HRS = 0 BBLS SPR'S: 10280" MD (8550' TVD) - TIME = 11:00, MW = 10.4 PPG #1 MP - 20/30 SPM = 330 / 440 PSI #2 MP - 20/30 SPM = 3401430 PSI INTERMEDIATE HOLE TD CALLED BY GEOLOGY AT 10,286' MD (8,550' TVD) 11:00 - 13:00 2.00 DRILL P INTI CIRCULATE, ROTATE AND RECIPROCATE 3X B/U 545 GPM, 3720 PSI 80 RPM, 6 K TQ FROM 10,180' MD TO 10,135' MD - 15 BPH LOSS RATE DURING CIRCULATION. - P/U = 272K, S/O = 150K, ROT = 182K -MONITOR WELL- WELL LOSING 1 BPH 13:00 15:30 2.50 DRILL P INT1 PUMP OUT OF THE HOLE TO JUST ABOVE THE KINGAK @ 8825' 1.25 BPM , 350 PSI - 6 BBL LOSS WHILE POOH 15:30 - 16:30 1.00 DRILL P _ INT1 POOH ON ELEVATORS F/ 8,825' TO 7,591' JUST ABOVE THE HRZ MONITORING HOLE VIA THE TRIP TANK 6.5 BBL LOSS DURING TRIP Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 13 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 17:30 1.00 DRILL P INT1 CIRCULATE, ROTATE AND RECIPROCATE B/U - 545 GPM, 3100 PSI - 100 RPM, 9 K TQ - FROM 7591' MD TO 7496' MD - 8 BBL LOSS DURING CIRCULATION. - SAW SIGNIFIGANT CUTTING, SLIGHTLY SPLINTERED 17:30 - 19:30 2.00 DRILL P INT1 TIH ON ELEVATORS F/ 7591' MD TO (TD) 10,286' WASH LAST STAND TO BOTTOM TAG BOTTOM WITH NO FILL DETECTED MONITORING TRIP VIA TRIP TANK - 14 BBL LOSS DURING TRIP 19:30 - 22:00 2.50 DRILL P INT1 CIRCULATE HOLE CLEAN, CBU 3 X ROTATE AND RECIPROCATE 50' 530 GPM, 3780 PSI ON BOT 80 RPM TQ = 12K OFF PUW- 272 K, SOW- 153K, ROT- 182 MW = 10.4 PPG IN / 10.4 PPG OUT DUMPED 290 BBLS OF MUD AND CIRCULATED IN 290 BBLS OF NEW 10.4 PPG 13.5 BPH LOSS RATE DURING CIRCULATION 22:00 - 00:00 2.00 DRILL P INTI MONITOR WELL - STATIC PUMP OUT OF THE HOLE F/ 10,286' TO 9,870' 1 BPM , 810' FT/HR PULLING SPEED MONITORING TRIP VIA TANK 1-2 ZERO LOSSES DURING THE PUMP OUT TOTAL LOSSES FOR THE DAY- 121 BBLS SPR'S: 10280" MD (8550' TVD) - TIME = 23:30, MW = 10.4 PPG #1 MP - 20/30 SPM = 410 / 500 PSI _ #2 MP - 20/30 SPM = 400 / 500 PSI 9/29/2012 00:00 - 03:00 3.00 DRILL P INTI _ PUMP OUT OF THE HOLE F/ 9,870' TO 8,825' 1 BPM, 810' FT/HR PULLING SPEED MONITORING TRIP VIA TANK 1-2 ZERO LOSSES DURING THE PUMP OUT 03:00 - 04:00 1.00 DRILL P INT1 POOH ON ELEVATORS FROM 8,825' MD TO JUST ABOVE THE HRZ @ 7,600- -MONITOR WELL ON PITS 1-2 04:00 - 05:00 1.00 DRILL P INT1 CIRCULATE BOTTOMS UP ROTATE AND RECIPROCATE 50' 545 GPM, 3025 PSI 80 RPM VERY LITTLE SHALE CUTTINGS COMING ACROSS THE SHAKER ZERO LOSSES DURING CIRCULATION - MONITOR THE WELL- WELL STATIC 05:00 - 08:30 3.50 DRILL P INT1 POOH ON ELEVATORS FROM 7600" MD TO 3200" MID, 69' INTO THE SHOE - MONITOR DISPLACEMENT VIA THE TRIP TANK 08:30 - 09:30 1.00 DRILL P INTI CIRCULATE ROTATE AND RECIPROCATE B/U IN 9-5/8" CASING 550 GPM, 2050 PSI - 80 RPM, 4K TQ MONITOR WELL AT CASING SHOE FOR 10 MIN - STATIC MW 10.4 PPG IN AND OUT NO LOSSES DURING CIRCULATION Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 14 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C: DRILL (8,454,681.00 ) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 14:00 4.50 DRILL P INT1 POOH F/ 3200' TO 945' ON 4" DP, MONITORING TRIP VIA TRIP TANK RACKING BACK IN DERRICK C/O SLIP INSETS AND ELEVATORS MONITOR WELL- WELL STATIC POOH F/ 945' TO 100' - LD 5" HWDP, 7-1/4" NMDC & 6-1/2" JARS 14:00 - 15:00 1.00 DRILL P INT1 L/D 8-3/4" BHA #5 FROM 1 00'MD TO SURFACE - PJSM WITH SLB MWD AND DD ON REMOVING RA SOURCE - REMOVE NUCLEAR SOURCES WITH BIT AT 100' MD - MONITOR WELL ON TRIP TANK 1-1-CT-G-X-1-NO-TD 15:00 - 16:30 1.50 BOPSUR P INT1 CLEAN AND CLEAR RIG FLOOR. - FLUSH THE BOP STACK, - PULL PS-21 AIR SLIPS, CLEAN, INSPECT, GREASE AND LUBE, REINSTALL WEEKLY BOP FUNCTION TEST - FUNCTION UPPER & LOWER 2-7/8" BY 5-1/2" VARIABLE BORE RAMS, FUNCTION ANNULAR & BLIND SHEARS CLOSING TIME: BAG- 32 SEC, UPPER PIPE RAM- 20 SEC, BLINDS- 32 SEC, LOWER PIPE RAMS- 20 SEC - PULL WEAR RING AND INSTALL TEST PLUG 16:30 - 17:30 1.00 BOPSUR P INT1 - PJSM C/O UPPER 2-7/8" BY 5-1/2" VARIABLE RAMS TO 7" CASING RAMS - C/O BAILS & ELEVATORS 17:30 - 19:00 1.50 BOPSUR P INT1 PJSM AND TEST BOP RAMS FILL STACK WITH WATER PRESSURE TEST UPPER 7" RAMS - 250 PSI / 3500 PSI FOR 5 MIN / 5 MIN CHARTED TEST - GOOD TEST 19:00 - 19:30 0.50 BOPSUR P INT1 - DRAIN STACK, PULL AND UD 7" TEST JOINT - B/D LINES AND R/D TESTING EQUIPMENT - R/U CASING EQUIPMENT 19:30 - 20:30 1.00 CASING P INT1 PERFORM DUMMY RUN WITH 7" HANGER AND LANDING JOINT -MARK LANDING JOINT AT ROTARY TABLE 20:30 - 22:00 1.50 CASING P INTI PJSM WITH RIG CREW, VOLANT, BP, DDI, GBR FOR RUNNING 7" CASING -ALL HAZARDS IDENTIFIED AND DISCUSSED INCLUDING WELL CONTROL SCENARIOS -MAKE UP SHOE TRACK WITH BAKER LOCK -CHECK FLOATS - TEST GOOD 22:00 - 00:00 2.00 CASING P INTI RUN 7" 26# L-80 VAMTOP HC CASING W/ VOLANT TOOL TO 462' MD - MONITOR TIH ON PIT 3 - FILL EVERY JT AND CIRC EVERY 10 JTS AS PER RUN TALLY. Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 15 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 9/30/2012 00:00 - 06:00 6.00 CASING P INT1 RUN 7" 26# L-80 VAMTOP HC CASING F/462' MD TO 3,250' - MONITOR DISPLACEMENT VIA PIT # 2-3 - FILL EVERY JT AND BREAK CIRCULATION EVERY 10 JTS CIRCULATE BU ABOVE THE 9-5/8" SHOE - CIRCULATE AT 5 BPM WITH 190 PSI, PUW-116K , SOW -140K MONITOR WELL FOR TEN MIN- WELL STATIC - ZERO LOSSES DURING CIRCULATION 06:00 - 21:00 15.00 CASING P INT1 CONT RUN 7" 26# L-80 VAMTOP HC CASING F/ 3,250" MD TO 10,204" -MONITOR DISPLACEMENT VIA PIT # 1 - 2 - FILL EVERY JT AND BREAK CIRCULATION EVERY 10 JTS 16 BBL TOTAL LOSS FOR THE TIH 21:00 - 21:30 0.50 CASING P INT1 MU HANGER & LANDING JOINT, LAND HANGER ON LANDING RING. @ 10,280- - PUW-345K , SOW- 157 21:30 - 00:00 2.50 CASING P INT1 CIRCULATE AND CONDITION MUD WHILE RECIPROCATING FROM 10,280'- 10,275' - STAGE PUMPS F/.5 BPM TO 7 BPM @ 605 -- PSI 1/2 BPM, 425 PSI 1 BPM, 545 PSI 2 BPM, 550 PSI 3 BPM, 610 PSI 4 BPM, 660 PSI--- STARTING TREATING MUD TO LOWER YP - 7 BMM, 605 PSI - 4P/U = 31 OK, S/O = 164K 27 BBL LOSS DURING CIRCULATION. - STARTED LOSING FLUID ABOVE 4 BPM CIRCULATION RATE - PUW-320K , SOW- 149, WITH PUMPS 10/1/2012 00:00 02:00 2.00 CASING P INT1 CONT: CIRCULATE AND CONDITION MUD WHILE RECIPROCATING FROM 10,280'- 10,275' - RU CEMENT LINE TO BAKER SWIVEL 02:00 02:30 0.50 CEMT P INT1 PJSM WITH SLB CEMENTERS, DDI RIG CREW, BPXA, CH2MHILL, MI ON CEMENT JOB -DISCUSS JOB, SPCC, WELL CONTROL, RIG EVAC, AND MUSTER AREA -VERIFY CEMENT VOLUMES, PUMP SCHEDULE AND OTHER CADE INFORMATION WITH SLB CEMENT LEAD 02:30 - 03:00 0.50 CEMT P INTI PRESSURE TEST CEMENT LINES: 250 / 4000 PSI FOR 5 / 5 MIN CHARTED TEST GOOD TEST Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 16 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3-01285-C: DRILL (8,454,681.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 06:00 3.00 CEMT P INT1 INTERMEDIATE CEMENT JOB AS FOLLOWS PIPE RECIPROCATION 10', ONLY ALLOWING SHOE 2' OF MOVEMENT OUT OF TOP OF SAG CEMENT PUMPING UNIT: - PUMP 30 BBLS 10.8 PPG MUD PUSH AT 4 BPM, 550 PSI - DROP BOTTOM PLUG. - PUMP 185.5 BBLS (595 SX) OF LITE CRETE 11.5 PPG LEAD CEMENT, YIELD 1.75C1UTT SK, 5-7 BPM - PUMP 38.4 BBLS (252 SX) 15.8 PPG CLASS G TAIL CEMENT. YIELD 1.17 CUFT/SK.. 5-7 BPM DROP TOP PLUG. - SLB TO CHASE PLUG W/ 10 BBLS OF WATER TO FLUSH CEMENT LINES. - 7" INTERMEDIATE CASING SHOE AT 10,280' MD SWAP TO RIG AND DISPLACE WITH 380.8 . BBLS 10.4 PPG LSND MUD: CALCULATED STROKES FOR 380.8 BBL DISPLACEMENT IS 3782 USING 96 % EFFICIENCY- (.1007 BBL/STK) DISPLACE AT 10 BPM UNTIL PRESSURE BUILDS AND PLUG IS CAUGHT - PUMP DISPLACEMENT PER SLB CEM CADE - 7 BPM, 550 PSI AT 240 BBLS AWAY - SLOW RATE TO 1.9 BPM, 880-900 PSI (10 BBL FROM PLUG BUMP) FINAL CEMENT LIFT PRESSURE 900 PSI BUMP PLUG WITH 379.5 BBLS BY STRAP ON THE PITS, 3783 STOKES - CONTINUE TO PUMP AT 2 BPM TO 500 PSI OVER FINAL PUMPING PRESURE- 1500 PSI - STOPPED PUMPING AND HOLD PRESSURE FOR 2 MIN - BLEED PRESSURE OFF AND CHECK FLOATS (FLOATS HOLDING) r CALCULATED STROKES FOR 380.8 BBL DISPLACEMENT IS 3782 USING 96 % EFFICIENCY- (.1007 BBL/STK) CEMENT IN PLACE AT 06:15 HRS TAIL CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH IN 10 HRS 41 MIN TAIL CEMENT WAS BATCHED AT 04:30 LEAD CEMENT REACHES 500 PSI COMPRESSIVE STRENGTH IN 23 HRS 41 MIN TAIL CEMENT WAS BATCHED AT 03:20 LOST 7 BBLS OVER ENTIRE CEMENT JOB. 06:00 07:00 1.00 BOPSUR P INT1 RU AND TEST 7" CSG TO 250PSI LOW FOR 5 CHARTED MINUTES AND 3700 PSI HIGH FOR 30 CHARTED MINUTES - GOOD -E-MAIL CHARTS TO WTL AND RECEIVE THE OK TO PROCEED Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 17 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:00 - 08:00 1.00 BOPSUR P INT1 CLOSE ANNULAR PREVENTER TQ NITIATE- INJECTION INTO THE 9-5/8" BY 7" ANNULUS PUMP AT 1 BPM WITH 10.4 PPG LSND MUD, - FCP- 1357 PSI WITH 10 BBLS BEFORE INJECTION WAS OBSERVED, PUMPE 4 BBLS TO ENSURE INJECTIVITY - PUMPED 14 BBLS TOTAL, RECIEVED 8 BBLS BACK 08:00 - 09:30 1.50 BOPSUR P INT1 L/D LANDING JOINT AND R/D VOLANT CASING RUNNING TOOL -CLEAR AND CLEAN RIG FLOOR - RD CEMENT LINE, LD ELEVATORS AND BAIL EXTENSIONS, INSTALL 4" ELEVATORS 09:30 - 11:30 2.00 WHSUR P INT1 PU / MU 7" PACK OFF & RIH ON 4" DP PACK OFF & LOCK DOWN SCREWS TORQUED PER FMC REP DIRECTION - PRESSURE TEST PACK OFF TO 250 PSI FOR 15 MIN LOW AND 5000 PSI HIGH, CHARTED - PER PE MANUAL SOP 11:30 - 12:00 0.50 BOPSUR P INT1 INJECT INTO THE OA AT 1 BPM - FORMATION BROKE OVER AT 1415 PSI , WITH 6 BBLS PUMPED 12:00 - 13:00 1.00 BOPSUR P INT1 C/O UPPER VBR'S BACK TO 2-7/8" X 5-1/2". COMPLETE DERRICK INSPECTION Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 18 of 22 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C: DRILL (8,454,681.00) Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 20:30 7.50 BOPSUR P INT1 RU AND TEST BOP TEST AS FOLLOWS: TEST BOPE PER BP/AOGCC/DDI REQUIREMENTS TO 250-PSI LOW / 3500-PSI HI. TESTED 2-7/8" X 5-1/2" UPPER VBR'S AND LOCKS, 2-7/8" X 5-1/2" LOWER VBR'S AND LOCKS WITH 4" & 4-1/2" TEST JTS. TESTED BLIND SHEAR RAMS 250-PSI LOW / 3500-PSI HI,2 EA. OF 4-1/2" IF FOSV'S, 1 EA. OF 4" DART VALVE & FOSV. TESTED CHOKE MANIFOLD VALVES 1-15, CHOKE AND KILL MANUAL & HCR VALVES, 4" KILL LINE VALVE & UPPER AND LOWER TOP DRIVE IBOP'S. TESTED MANUAL AND SUPER CHOKES TO 250-PSI LOW / 2000-PSI FOR 5 CHARTED MINUTES EACH TEST, TESTED ANNULAR PREVENTER WITH 4" TEST JT. 250-PSI LOW / 3500-PSI HI. CHARTED ALL HI AND LOW TESTS FOR 5-MINUTES EACH. *** FAILED TEST**** UPPER I-BOP FAILED, WILL HAVE TO CHANGE OUT AND RE TEST PERFORMED ACCUMULATOR DRAWDOWN TEST: - ACCUMULATOR PSI = 3100, MANIFOLD PSI = 1500 - ACCUMULATOR PSI AFTER FUNCTIONING BOPE = 1800-PSI - RECOVERY TO FULL SYSTEM PRESSURE _ 115 SECONDS. - 6 NITROGEN BOTTLES AVERAGE PRESSURE = 2060-PSI BOP CLOSING TIMES: ANNULAR PREVENTER = 39-SECONDS UPPER PIPE RAMS = 20-SECONDS - LOWER PIPE RAMS = 20-SECONDS - BLIND/SHEAR RAMS = 27-SECONDS - HCR KILL VALVE = 2-SECONDS HCR CHOKE = 2-SECONDS. REFERENCED DDI BOP TESTING SOP FOR ALL TESTING. BOPE TEST WITNESSED BY AOGCC- JEFF JONES, DOYON TOOLPUSHERS- SAM DYE,JOHN NEWMAN AND BP WSL-MIKE DINGER & ANTHONY KNOWLES. 20:30 21:30 1.00 BOPSUR P INT1 PULL TEST PLUG, INSTALL WEAR RIND_ - I. D. - 7-1/16" RD TEST EQPT INJECT DOWN IA, 1/2 BPM WITH FORMATION BREAK DOWN AT 1344 PSI, TOTAL 6 BBLS PUMPED 21:30 - 22:00 0.50 BOPSUR P INT1 RIG SERVICE 22:00 00:00 2.00 BOPSUR N RREP INT1 CHANGE OUT UPPER I-BOP 10/2/2012 00:00 - 02:30 2.50 BOPSUR N RREP INT1 CHANGE OUT UPPER I-BOP SIMOPS: INJECT DOWN THE OA 1 BPM WITH BREAK OVER AT 1245 PSI, FCP = 890 PSI -PUMPED TOTAL OF 4.8 BBLS Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 19 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3 -01285-C: DRILL (8,454,681.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 03:30 1.00 _ BOPSUR N RREP INTI RU TEST EQUIPMENT & RE -TEST I -BOP - 250 LOW / 3500 HIGH FOR 5 MIN EACH . (PASSED) 03:30 - 04:00 0.50 BOPSUR P INT1 SERVICE RIG 04:00 04:30 0.50 DRILL P INTI INJECT DOWN THE OA - 1 BPM WITH BREAK OVER AT 940 PSI, FCP = 770 PSI - PUMPED TOTAL OF 4 BBLS 04:30 - 05:00 0.50 DRILL P INT1 C/O SLIP INSERTS AND INSTALL STRIP-O-MATIC 05:00 - 09:00 4.00 DRILL P INTI M/U PRODUCTION DRILLING BHA # 6 - 6-1/8" HC VM-R18DVHX INSERT BIT, 1.15° MOTOR,GR/RES/ADN 09:00 - 16:00 7.00 DRILL P INTI RIH FROM 700' TO 10,008' MD - SHALLOW HOLE TEST MWD AT 1075' AT 225 GPM, 1100 PSI SIMOPS: FREEZE PROTECT OA - PUMP 11.5 BBLS 10.4 PPG MUD FOLLOWED BY 64 BBLS 80 DEG DIESEL 1.7 BPM, 1090 PSI 16:00 - 18:30 2.50 DRILL P INT1 SLIP AND CUT 166' OF DRILL LINE 18:30 - 19:30 1.00 DRILL P INT1 RIH FROM 10,080' TO 10,103' MD - WASH AND REAM FROM 10,103' AND TAG CEMENT AT 10,139' 19:30 21:00 1.50 DRILL P INTI DRILL OUT SHOE TRACK TO 10,265' MD (15' FROM SHOE) - 220 GPM, 2040 PSI - 60 RPM, 5K TQ _ 21:00 - 22:00 1.00 DRILL P INTI DISPLACE WELL TO 8.7 PPG FLO-PRO 210 GPM, 2000 PSI 60 RPM, 5K TQ SPR'S: 10265' MD (8525' TVD) - TIME = 22:30, MW = 8.7 PPG #1 MP - 20/30 SPM = 350 / 480 PSI #2 MP - 20/30 SPM = 330 / 470 PSI 22:00 - 23:30 1.50 DRILL P INT1 DRILL SHOE TRACK AND 20' OF NEW FORMATION TO 10 306' MD - 250 GPM, 1654 PSI - 60 RPM, 6K TQ - 15-17K WOB - P/U 200K, S/O 150K 23:30 - 00:00 0.50 DRILL P INT1 CIRCULATE BOTTOMS UP - 250 GPM, 1382 PSI - 60 RPM, 6K TQ 10/3/2012 00:00 - 00:30 0.50 DRILL P INT1 CONTINUE TO CIRCULATE BOTTOMS UP 250 GPM, 1382 PSI - 60 RPM, 6K TQ - MW 8.8 IN/ 8.8 OUT MONITOR WELL FOR 10 MIN - STATIC Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 20 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3 -01285-C: DRILL (8,454,681.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:30 - 02:00 1.50 DRILL P INT1 PULL BACK INTO SHOE & PERFORM FIT TO 12.5 PPG 10,280' MD, 8,545' TVD -MW 8.8IN/8.8OUT - UNABLE TO ACHIEVE FIT TO 12.5 PPG, PRESSURE BROKE OVER AT 1023 PSI - LEAK -OFF AT 11.1 PPG - 2.0 BBLS PUMPED, 1.5 BBLS RETURNED - AUTHORIZATION TO PROCEED RECEIVED FROM ODE WITH GREATER THAN 50 BBL KICK TOLERANCE 02:00 - 09:00 7.00 DRILL P PROW DRILL 6-1/8" PRODUCTION HOLE FROM 10,306' TO 10,423' MD - 250 GHM, ISO(TRSI-ON/ 1400 PSI OFF - 40 RPM, TO = 6-8K ON / 5K OFF -WOB=20K -MW=8.8PPG - P/U 195K, S/O 158K, ROT 175K - ADT = 4.25, ART = 2.03, AST = 2.22 09:00 17:00 8.00 DRILL N DPRB 10,423.00 PROD1 WHILE DRILLING AHEAD IN THE SHUBLIK FORMATION AT 10,423' MD, THE DRILLER NOTICED AN INCREASED FLOW PERCENTAGE ON THE DRILLER'S CONSOLE. THE PUMPS WERE SHUT DOWN AND THE WELL WAS OBSERVED TO BE FLOWING. THE WELL WAS SHUT IN WITH THE ANNULAR PREVENTER. AN 8 BBL PIT GAIN WAS DETECTED AND CONFIRMED BY THE PIT WATCHER. PRESSURES WERE ALLOWED TO STABILIZE. SIDP 0 PSI, SICP 90 PSI. THE WELL WAS CIRCULATED SURFACE TO SURFACE USING THE DRILLERS METHOD WITH SIDP 0 PSI, SICP 0 PSI. THE ANNULAR PREVENTER WAS OPENED AND THE WELL WAS OBSERVED TO BE STATIC. TRIPPED TWO STANDS TO THE 7" CASING SHOE AT 10,280'. CIRCULATED 2 BOTTOMS UP AT CASING SHOE AT 250 GPM, 1475 PSI WITH NO LOSSES OR GAINS THROUGHOUT CIRCULATIONS. SOME GAS BREAK OUT WAS OBSERVED ON FIRST BOTTOMS UP, WITH NO GAS ON SECOND BOTTOMS UP. PROPER NOTIFICATIONS MADE TO ANCHORAGE MANAGEMENT TEAM AND OPERATIONS CHANGE NOTICE APPROVED TO PROCEED WITH OPERATIONS. 17:00 - 17:30 0.50 DRILL P PROD1 SERVICE TOPDRIVE 17:30 - 21:00 3.50 DRILL N RREP 10,423.00 PROW TROUBLESHOOT TOPDRIVE - CHANGE OUT TOPDRIVE HYDRAULIC PUMP MONITOR WELL WITH HOLE FILL LINE - STATIC 21:00 - 22:00 1.00 DRILL N DPRB 10,423.00 PROD1 CIRCULATE BOTTOMS UP AT 250 GPM, 1475 PSI - DECREASE RATE TO 170 GPM, 850 PSI AT 70 BBLS PRIOR TO BOTTOMS UP - SOME GAS BREAK OUT WAS OBSERVED 20 BBLS BEFORE BOTTOMS UP, NO GAS AFTER BOTTOMS UP Printed 11/29/2012 5:00:56PM _5f North America - ALASKA - BP Page 21 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3-01285-C: DRILL (8,454,681.00 ) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11 ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 DRILL N RREP 10,423.00 PROD1 CONTINUE TO TROUBLESHOOT TOPDRIVE WHILE CIRCULATING THROUGH BIT AT 150 GPM, 640 PSI 10/4/2012 00:00 - 02:00 2.00 DRILL N RREP 10,423.00 PROD1 CONTINUE TO TROUBLESHOOT TOPDRIVE WHILE CIRCULATING THROUGH BIT AT 128 GPM, 545 PSI 02:00 - 02:30 0.50 DRILL P PROD1 SERVICE RIG 02:30 - 05:00 2.50 DRILL N DPRB 10,423.00 PROD1 RIH TO BOTTOM AND CIRCULATE 2 BOTTOMS UP AT 250 GPM, 1500 PSI - DECREASE RATE TO 126 GPM, 550 PSI AT 60 BBLS PRIOR TO BOTTOMS UP - SOME GAS BREAK OUT WAS OBSERVED ON BOTTOMS UP, WITH NO GAS ON SECOND BOTTOMS UP 05:00 12:00 7.00 DRILL P PROD1 DRILL 6-1/8" PRODUCTION HOLE FROM 10,423' TO 10,669' MD 250 GPM, 1720 PSI ON/ 1580 PSI OFF 100 RPM, TO = 4K ON/ 3K OFF WOB = 20 K MW = 8.8 PPG P/U 201 K, S/O 159K, ROT 179K - ADT = 3.23, ART = 3.23, AST = 0 SPR'S: 10400' MD (8637' TVD) - TIME = 04:50, MW = 8.8 PPG #1 MP - 20/30 SPM = 340 / 500 PSI #2 MP - 20/30 SPM = 400 / 500 PSI 12:00 - 19:30 7.50 DRILL P PROD1 DRILL 6-1/8" PRODUCTION HOLE FROM 10 669' TO TD OF 11 021' MD - 250 GPM, 1700 PSI ON/ 1600 PSI OFF - 100 RPM, TO = 6K ON / 6K OFF -WOB=15K -MW=8.8PPG - P/U 217K, S/O 160K, ROT 183K - ADT = 5.70, ART = 5.02, AST = 0.68 SPR'S: 10762' MD (8961' TVD) - TIME = 14:00, MW = 8.8 PPG #1 MP - 20/30 SPM = 420 / 580 PSI #2 MP - 20/30 SPM = 420 / 560 PSI 19:30 21:00 1.50 DRILL P PROD1 CIRC 2 BOTTOMS UP WHILE ROTATING AND RECIPROCATING 250 GPM, 1540 PSI 100 RPM, 4K TQ P/U 217K, S/O 160K, ROT 183K NO GAS OBSERVED ON BOTTOMS UP SPR'S: 11,017' MD (9193' TVD) -TIME= 14:00, MW=8.8PPG #1 MP - 20/30 SPM = 340 / 500 PSI #2 MP - 20/30 SPM = 380 / 500 PSI 21:00 23:00 2.00 DRILL P PROW POOH ON ELEVATORS FROM 10,950' TO 8,579' MD - P/U 164K, S/O 123K - MONITOR WELL ON TRIP TANK 23:00 23:30 0.50 DRILL P PROD1 MONITOR WELL FOR 30 MIN - STATIC 23:30 - 00:00 0.50 DRILL P PROD1 RIH ON ELEVATORS FROM 8579' TO 8773' MD Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 22 of 22 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: DRL- ONSHORE (DON) Start Date: 9/15/2012 End Date: 10/5/2012 X3-01285-C: DRILL (8,454,681.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/5/2012 00:00 - 01:30 1.50 DRILL P PROD1 RIH ON ELEVATORS FROM 8,773' TO 11,021' MD SPR'S: 11,021' MD (9196' TVD) -TIME= 01:30, MW = 8.8 PPG #1 MP - 20/30 SPM = 400 / 550 PSI #2 MP - 20/30 SPM = 370 / 520 PSI 01:30 - 03:30 2.00 DRILL P PROD1 CIRC 2 BOTTOMS UP - 250 GPM, 1570 PSI - 100 RPM, 5K TQ - P/U 212K, S/O 160K, ROT 180K - SLIGHT TRACE OF GAS OBSERVED AT BOTTOMS UP NO DYNAMIC OR STATIC LOSSES MONITOR WELL FOR 10 MIN - STATIC 03:30 05:30 2.00 DRILL P PROD1 PUMP OUT OF HOLE FROM 11,021' TO 10,000' MD AT 3 BPM, 520 PSI - P/U 195K, S/O 150K, ROT 175K MONITOR WELL FOR 10 MIN - STATIC 05:30 - 09:30 4.00 DRILL P PROD1 POOH ON ELEVATORS FROM 10,000' TO BHA AT 700' MD MONITOR WELL FOR 10 MIN - STATIC 09:30 - 13:00 3.50 DRILL P PROD1 L/D PRODUCTION DRILLING BHA #6 - BIT GRADE 2-4-LT-G-E-I-WT-TD 13:00 - 14:30 1.50 BOPSUB P PROD1 R/D BOPE TEST EQUIPMENT 14:30 16:00 1.50 BOPSUB P PROD1 R/U TO TEST BOPE - DRAIN STACK, P/U 4" TEST JOINT, PULL WEAR RING, INSTALL TEST PLUG 16:00 17:00 1.00 EVAL _ P PROW PJSM. R/U E-LINE AND WU OPENHOLE SONIC LOGGINGASSEMBLY 17:00 - 19:00 2.00 EVAL P PROD1 TESTED ANNULAR, CHOKE LINE HCR, CHOKE MANIFOLD BODY TEST TO 250 PSI LOW / 3500 PSI HIGH AND RAMS TO 250 PSI LOW / 3500 PSI HIGH FOR 5 MIN EACH. ALL TESTS CHARTED. SEE BOP TEST ATTACHMENT. 19:00 - 00:00 5.00 EVAL P PROD1 RUN OPENHOLE SONIC LOGS ON E-LINE- LOG FROM 11,021' TO 9,950' MD 10/6/2012 00:00 - 02:00 2.00 EVAL P PROD1 POOH WITH SONIC LOGGING ASSEMBLY ON E-LINE 02:00 - 03:30 1.50 EVAL P PROD1 L/D LOGGING TOOLS AND R/D E-LINE Printed 11/29/2012 5:00:56PM North America - ALASKA - BP Page 1 of 5 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/5/2012 End Date: 10/10/2012 X3-01285-C:DRILL (3,236,320.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/6/2012 03:30 - 05:30 2.00 CASING P RUNPRD R/U TO RUN 4-1/2" PRODUCTION LINER 05:30 - 08:30 3.00 CASING P RUNPRD RUN 4-1/2" PRODUCTION LINER ASSEMBLY PER PROGRAM TO 880' MD P/U 4-1/2" SHOE TRACK FILL LINER AND VERIFY FLOATS HOLDING. FLOATS GOOD - BAKER LOCK ALL CONNECTION BELOW LANDING COLLAR JOINT = P/U 4-1/2", 12.6 LB -FT VAM TOP LINER, APPLY JET LUBE SEAL GUARD. TORQUE TURN 4-1/2" TO TQ OF 4,440 FT -LB. - CONTINUE RIH WITH 4-1/2 LINER PER PROGRAM - MW IN AND OUT 8.8 -PPG 08:30 - 09:30 1.00 CASING P RUNPRD M/U BAKER LINER HANGER AND ZXP LINER TOP PACKER CIRC 3 LINER VOLUME AT 4 BPM, 90 PSI P/U 52K, S/O 57K 09:30 - 16:30 7.00 CASING P RUNPRD RIH WITH 4-1/2" LINER ON 4" DP FROM 880' TO 10,238' MD - FILL PIPE EVERY 10 STANDS 16:30 - 17:30 1.00 CASING P RUNPRD CIRC BOTTOMS UP AT 7" SHOE STAGE PUMPS TO 6 BPM, 830 PSI P/U 189K, S/O 151 K NO LOSSES 17:30 - 19:30 2.00 CASING P RUNPRD RIH WITH 4-1/2" LINER ON 4" DP FROM 10,238' TO 11,021' MD - M/U CEMENT HEAD AND TAG LINER ON DEPTH AT 11,021' 19:30 - 21:30 2.00 CASING P RUNPRD RECIPROCATE 20' STROKES WHILE CIRCULATING 3 BOTTOMS UP STAGE PUMPS UP TO 6 BPM, 840 PSI P/U 195K, S/O 157K - NO LOSSES WHILE CIRCULATING Printed 11/29/2012 5:01:10PM North America - ALASKA - BP Page 2 0#5 Operation Summary Report Common Well Name: Z-69 AFE No X3-01285-C:DRILL (3,236,320.00 ) Event Type: COM- ONSHORE (CON) Start Date: 10/5/2012 End Date: 10/10/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 23:30 2.00 CEMT P RUNPRD CEMENT 4-1/2" LINER AS FOLLOWS: - HOLD PJSM WITH RIG CREW, SLB CEMENT CREW AND BPXA CEMENT PUMPING: PUMP 20 BBLS 10.0 PPG MUD PUSH - PRESSURE TEST LINES TO 250 LOW / 4,800 -HIGH FOR 5 MIN EACH. GOOD TEST - PUMP 27.6 BBLS, 15.8 PPG CLASS G TAIL CEMENT AT 3.5 BPM, YIELD 1.54 (101 SXS) - DROP DRILL PIPE WIPER DART. POSITIVE INDICATION DART LEFT CEMENT HEAD. - USE SLB CEMENTERS TO DISPLACE WITH 35 BBLS 8.8 PPG PERF PILL, FOLLOWED BY 8.8 PPG FLO-PRO MUD AT 6 BPM, 80 PSI - 44.7 BBLS AWAY: CAUGHT CEMENT, PRESSURE INCREASED TO 620 PSI - 98 BBLS AWAY: SLOW PUMPS TO 3 BPM AT 98 BBLS, LATCH UP WIPER PLUG WITH 2200 PSI AND 104.7 BBLS AWAY. - 108 BBLS AWAY: SLOW PUMP TO 2 BPM PRIOR TO BUMP - BUMP PLUG AT 116.8 BBLS, 934 PSI (ON CALCULATED DISPLACEMENT) RED UP ON PLUG TO 3,000 -PSI TO SET LINER HANGER, SLACK OFF, HANGER DID NOT SET - PRESSURE UP TO 4200 PSI, S/O 60K TO CONFIRM HANGER SET - BLEED OFF PRESSURE & CHECK FLOATS. FLOATS HOLDING. - P/U TO CONFIRM RUNNING TOOL RELEASED CEMENT IN PLACE AT 23:30 HRS NO LOSSES WHILE DISPLACING CEMENT - GOOD LIFT PRESSURE THROUGHOUT JOB 23:30 - 00:00 0.50 CASING P RUNPRD SET LINER TOP PACKER P/U 6' TO EXPOSE DOG SUB SET ZXP LINER TOP PACKER WITH 60K_ INDICATION OF SHEAR SEEN AT SURFACE - ROTATE WITH 50K DN WT TO CONFIRM 4-1/2" LINER TOP PACKER SET 10/7/2012 00:00 - 02:00 2.00 CASING P RUNPRD CIRC OUT CEMENT - PICK UP WITH 500 PSI ON DRILL PIPE UNTIL PRSSURE DROP OBSERVED. - PULL OUT OF LINER & CIRCULATE EXCESS CEMENT OUT AT 10 BPM @ 1,300 PSI. - 6 BBLS CEMENT RETURNED TO SURFACE 02:00 - 03:30 1.50 CASING P RUNPRD DISPLACE WELL TO 8.7 PPG BRINE - 420 GPM, 1390 PSI - P/U 180K, S/O 154K MONITOR WELL FOR 10 MIN - STATIC 03:30 - 08:00 4.50 CASING P RUNPRD POOH UD DRILLPIPE DOUBLES TO PIPESHED FROM 10,102' TO 3,475' MD 08:00 - 11:30 3.50 CASING P RUNPRD POOH UD DP SINGLES TO PIPESHED FROM 3,475' TO 47' MD 11:30 - 12:00 0.50 CASING P RUNPRD UD LINER RUNNING TOOL 12:00 - 13:00 1.00 EVAL P OTHCMP JET STACK WITH STACK WASHER FUNCTION ALL RAMS Printed 11/29/2012 5:01:10PM �Wlr u y.5 North America - ALASKA - BP Page 3 of 5 Operation Summary Report Common Well Name: Z-69 AFE No Event Type: COM- ONSHORE (CON) Start Date: 10/5/2012 End Date: 10/10/2012 X3 -01285-C: DRILL (3,236,320.00) Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 13:30 0.50 EVAL P OTHCMP PJSM WITH RIG CREW AND E -LINE CREW FOR R/U E -LINE 13:30 - 16:30 3.00 EVAL P OTHCMP R/U E -LINE UNIT AND SONIC SCANNER/ USIT LOGGING ASSEMBLY - HOLD AAR ON R/U E -LINE 16:30 - 21:00 4.50 EVAL P OTHCMP RIH WITH SONIC SCANNER / USIT LOGGING ASSEMBLY - LOG REPEAT PASS 21:00 - 00:00 3.00 EVAL N DFAL OTHCMP POOH AND TROUBLESHOOT LOGGING TOOLS - REPAIR CONNECTION ON LOGGING ASSEMBLY 10/8/2012 00:00 01:00 1.00 EVAL N DFAL OTHCMP RIH WITH SONIC SCANNER / USIT LOGGING ASSEMBLY ON E -LINE 01:00 - 14:00 13.00 EVAL P OTHCMP LOG MAIN PASS ON E -LINE FROM 10.092' TO SURFACE AT 800 FPH 14:00 - 15:00 1.00 EVAL P OTHCMP L/D LOGGING TOOLS AND R/D E -LINE 15:00 - 16:00 1.00 EVAL P OTHCMP R/U AND PRESSURE TEST 7" CASING AND 4-1/2" PRODUCTION LINER - 250 / 3500 PSI, 5 / 30 MIN CHARTED TEST - GOOD TEST - WTL APPROVAL TO PROCEED 16:00 - 16:30 0.50 EVAL P OTHCMP R/D TEST EQUIPMENT 16:30 - 18:30 2.00 RUNCOM P RUNCMP R/U TO RUN 4-1/2" 13CR VAMTOP COMPLETION - MAKE TUBING HANGER DUMMY RUN 18:30 - 19:00 0.50 RUNCOM P RUNCMP PJSM WITH DDI, BPXA, HALLIBURTON ON RUNNING 4.5" 13CR COMPLETION STRING. 19:00 - 00:00 5.00 RUNCOM P RUNCMP RUN 4.5" 12.6 LB/FT, 13CR-85, VAMTOP COMPLETION TO 3640' MD WLEG, XN-NIPPLE, X -NIPPLE, HES TNT PACKER, X -NIPPLE, 8 GLM'S, X -NIPPLE - TORQUE TURN VAMTOP CONNECTIONS TO 4,440 FT -LBS 10/9/2012 00:00 - 07:00 7.00 RUNCOM P RUNCMP CONTINUE TO RUN 4.5" 12.6 LB/FT, 13CR-85, VAMTOP COMPLETION FROM 3640' MD TO 10,038' MD - WLEG, XN-NIPPLE, X -NIPPLE, HES TNT PACKER, X -NIPPLE, 8 GLM'S, X -NIPPLE - TORQUE TURN VAMTOP CONNECTIONS TO 4,440 FT -LBS - MONITOR DISPLACAMENT WHILE RIH - P/U WT= 158K, S/O WT= 114K 07:00 - 09:00 2.00 RUNCOM P RUNCMP _ SPACE OUT AND LAND COMPLETION - SPACE OUT TO LAND 4.5" 12.6#, 13CR-85, VAMTOP COMPLETION - M/U HANGER, LAND HANGER, RILDS 09:00 - 10:00 1.00 RUNCOM P RUNCMP R/U CIRCULATING EQUIPMENT TO TUBING AND IA. Printed 11/29/2012 5:01:10PM North America - ALASKA - BP Page 4 of 5 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (3,236,320.00) Event Type: COM- ONSHORE (CON) Start Date: 10/5/2012 End Date: 10/10/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 11:30 1.50 RUNCOM P RUNCMP REVERSE CIRCULATE 8.7 PPG BRINE AND 8.7 PPG CORROSION INHIBITED BRINE DOWN IA. - 4 BPM, 590 PSI - PUMP 156 BBLS 120 DEG 8.7 PPG BRINE - PUMP 99 BBLS 120 DEG CORROSION INHIBITED 8.7 PPG BRINE - PUMP 92 BBLS 120 DEG 8.7 PPG BRINE R/U AND PUMP DOWN TUBING TO CLEAN RHC -M BALL SEAT PROFILE - PUMP 5 BBLS 120 DEG 8.7 PPG BRINE 11:30 - 12:00 0.50 RUNCOM P RUNCMP DROP 1.875" BALL & ROD 12:00 - 16:00 4.00 RUNCOM P RUNCMP PRESSURE UP TUBING, SET PACKER AND TEST - 250 / 3500 PSI FOR 5 / 30 MIN CHARTED TEST, GOOD TEST - BLEED TUBING TO 1500 PSI AND HOLD. PRESSURE UP IA AND TEST - 250 / 3500 PSI FOR 5 / 30 MIN CHARTED TEST, GOOD TEST - WTL APPROVAL TO PROCEED HOLD IA PRESSURE AT 3500 PSI BLEED TUBING PRESSURE TO 0 PSI AND SHEAR DCK VALVE PUMP DOWN IA - 20 SPM, 270 PSI PUMP DOWN TUBING - 20 SPM, 270 PSI CONFIRMATION THAT SHEAR VALVE IS OPEN 16:00 - 16:30 0.50 WHSUR P RUNCMP P/U T -BAR & DRY ROD IN TWC. 16:30 - 18:00 1.50 WHSUR P RUNCMP PRESSURE TEST TWC FROM BELOW 250 / 3500 PSI FOR 5 / 30 MIN TEST - GOOD TEST PRESSURE TEST TWC FROM ABOVE - 250 / 3500 PSI FOR 5 / 5 MIN TEST - GOOD TEST 18:00 - 00:00 6.00 WHSUR P RUNCMP N/D BOP REMOVE STRIP-O-MATIC & INSPECT - JET & R/D FLOWLINE - REMOVE BOLTS & PULL 14' RISER - PULL DSA OFF WELLHEAD 10/10/2012 00:00 - 02:00 2.00 WHSUR P RUNCMP N/U 4-1/8" X 4-1/16" DRY HOLE TREE 02:00 - 02:30 0.50 WHSUR P RUNCMP TEST ADAPTER FLANGE - 250 PSI LOW 5 MIN - 5000 PSI HIGH 5 MIN - GOOD TEST 02:30 - 03:30 1.00 WHSUR P RUNCMP PRESSURE TEST TREE TO 250/5000 PSI FOR 5/10 MIN CHARTED TEST - GOOD TEST 03:30 04:30 1.00 WHSUR P RUNCMP R/U DRILL SITE MAINTENANCE LUBRICATOR. TEST LUBRICATOR TO 250/3500 PSI FOR 5/5 'MIN TEST GOOD TEST 04:30 - 05:00 0.50 WHSUR P RUNCMP PULL TWC W/ LUBRICATOR. - R/D LUBRICATOR. Printed 11/29/2012 5:01:1OPM North America - ALASKA - BP Page 5 of 5 Operation Summary Report Common Well Name: Z-69 AFE No X3 -01285-C: DRILL (3,236,320.00) Event Type: COM- ONSHORE (CON) Start Date: 10/5/2012 End Date: 10/10/2012 Project: Prudhoe Bay Site: PB Z Pad Rig Name/No.: DOYON 25 Spud Date/Time: 9/8/2012 12:00:OOAM Rig Release: 10/10/2012 Rig Contractor: DOYON DRILLING INC. UWI: Active Datum: Z-69 actual @96.11ft (above Mean Sea Level) Date From - To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 05:00 - 07:00 2.00 WHSUR P RUNCMP DIESEL FREEZE PROTECT TO 2,200' TVD - R/U AND TEST CIRC LINES TO 250 LOW / 3500 PSI HI FOR 5/5 MINS EACH (GOOD TEST) - REVERSE CIRC 75 BBLS OF 80° DIESEL AT 1 BPM ICP= 260 PSI, DCP= 640 PSI 07:00 - 09:00 2.00 WHSUR P RUNCMP _ ALLOW DIESEL TO U•TUBE - R/D TUBING CIRC LINES - REMOVE KELLY HOSE, BRIDLE UP, R/D MUD PUMP LINES 09:00 - 09:30 0.50 WHSUR P RUNCMP R/U DRILL SITE MAINTENANCE LUBRICATOR. TEST LUBRICATOR TO 250/3500 PSI FOR 5/5 MIN TEST -GOOD TEST 09:30 - 12:00 2.50 WHSUR P RUNCMP SET BPV. R/D LUBRICATOR. TEST BPV FROM BELOW FOR 250/3500 PSI FOR 5/30 CHARTED MINS. GOOD TEST. BLEED DOWN LINES SIMOPS: R/D LINES, PREP JOB CRANE EXTENSION, PREP RIG FOR MOB. 12:00 - 14:00 2.00 WHSUR P RUNCMP SECURE WELL. PREP RIG FOR RIG DOWN - INSTALL FLANGES WITH NEEDLE VALVE W/ GAUGES ON BOTH ANNULI - R/D CIRC HOSES IN CELLAR RELEASE RIG AT 14:00 HRS Printed 11/29/2012 5:01:10PM Z-69, Well History (Post Rig Sidetrack) Date Summary 10/11/12 T/1/0=0/0/0 Conducted PJSM. Barriers = Dry hole tree -two valves- Start barrier list. Attached lubricator, PT'd 250/low..3500/high.. pass. PULLED 4" CIW "H" TWC THRU tree using 0 ext. Tagged @ 85" Doyon 25- circ. out- re -attached lubricator PT'd 250/low..3500/high.. Pass. SET 4" CIW "H" BPV #710 thru dry hole tree. Tagged @ 85" DOYON 25 RDMO no problems. 10/13/12 T/1/0= 0/0/100 Conducted PJSM w/crew; Barriers= BPV & MV; Start Barrier list; P.T. down on MV (LTT) to 500 psi (passed); Doyon 25 performed LTT test on bottom side of BPV on 10/11/12 (passed); Removed SV (dry hole tree) & installed 4-1/16" CIW upper tree, re -orientated tree for ME 60 Actuator; Torqued tree flange nuts to spec. (L7M non coated studs, 726 ft/lbs @ 5250 pump psi); P.T. (charted) upper tree against MV to 300 psi/5000 psi (passed), Charted tree tests downloaded into U -drive TRP folder; Removed piggy backed I/A & O/A valves; P.T. I/A & O/A blind flanges to 3000 psi (passed). Post Doyon 25. 11/08/12 T/1/0=325/325/200 Conducted PJSM. Barriers = SSV & Swab. Start barrier list. Performed LTT on Swab & SSV. Pass. Removed tree cap, attached lubricator, PT'd against Swab & SSV 250/low..3500/high.. 5 min. each. Pass. PULLED 4" CIW "H" BPV #710 thru tree using 1-1' ext. Tagged @ 112". Removed lubricator, installed tree cap, PT'd to 500 psi. pass. Post Doyon 25. 11/08/12 PULLED B&R FROM RHC @ 10079' SLM. PULLED BK-DGLV FROM ST#1 @ 9892' SLM/9921' MD. 11/09/12 T/1/0= 300/300/130 Temp. - SI Assist Slickline circ IA & Tbg (New Well) Pumped 10 bbls neat meth followed by 400 bbls of 95* F diesel down the IA thru station #1 (9921') taking returns up flowline to production. Freeze Protect Flowline with 4 bbls neat and 2 bbls diesel. Bled to Final WHP= 0/0/205. 11/09/12 PULLED BEK-DCK FROM ST# 7 @ 4642' SLM/4674' MD. SET BK-DGLV IN ST#7 @ 4642' SLM/4674' MD. SET FLOWSLEEVE IN ST#1 @ 9892' SLM/9921' MD. LRS CIRCULATE 400 BBL DIESEL DOWN IA TO FLOWLINE. PULLED FLOWSLEEVE FROM ST#1 @ 9892' SLM/9921' MD PULLED BK-DGLV's FROM ST#3 (8502' SLM/8534' MD), #6 (6298' SLM/6328' MD) & #8 (3072' SLM/3103' MD). 11/10/12 SET BK-LGLV IN ST#8 @ 3072' SLM/3103' MD. SET BK-LGLV IN ST#6 @ 6298' SLM/6328' MD SET BK-LGLV IN ST#3 @ 8502' SLM/8534' MD. SET BK-OGLV IN ST#1 @ 9892' SLM/9921' MD. PULL RHC BODY FROM XN NIPPLE @ 10062' SLM/10096' MD. DRIFT W/ 3-3/8" DMY GUN, WORKED TOOLS DOWN TO 10747SLM (smpl of mud). 11/12/12 PERFORATED INTERVAL @ 10676'- 10686'W/ 10'x 2-7/8" POWERJET OMEGA GUN (WHILE RUNNING IN SET DOWN @ 5590'& 6820' BUT ABLE TO WORK PAST). LOGGED JEWELRY LOG FROM 10731' TO 9800'. CORRELATED TO SCHLUMBERGER MWD FIELD LOG DATED 10/5/2012. FINAL T/l/O = 500/0/100 PSI. WELL LEFT SHUT IN UPON DEPARTURE - NOTIFIED PAD OP OF WELL STATUS. Page 1 of 1 by ScMuer' 0 Z-69 ASP Final Survey Report (Def Survey) Client: DP Exploration Alaska Vertical Section Azimuth: 9.519' (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure 1 Slot: Z -PAD f Z-69 (NJ) TVD Reference Datum: Rotary Table Well: Z-69 TVD Reference Elevation: 96,110 ft above MSL Borehole: Z-69 Seabed I Ground Elevation: 56,100 It above MSL API* 50-029.23471.00 Magnetic Declination: 20.552 ` Survey Name: Z-69 Total Gravity Field Strength: 1002.6731 m9n (9.8 based) Survey Date: October 04, 2012 Total Magnetic Field Strength: 57618.010 nT Tort I AHD 1 DDI I ERD Ratio: 207.616' 15199.443 it 16.11210.565 Magnetic Dip Angle: 80.965 ° Coordinate Reference System: NAD27 Alaska State Plane. Zone 04, US Feet Decimation Date: October 01, 2012 Location Lat I Long: N 70° 17'5Z98812", W 149' 11'24.51079" Magnetic Declination Model: BGGM 2012 Location Grid NIE YIX: N 5959239.940 ftUS, E 600003.450 RUS North Reference: True Norm CRS Grid Convergence Angle: 0.7625 ° Grid Convergence Used: 0.0000 ° Grid Scale Factor: 0.99991136 Total Corr Mag North ->True North: 20.5522' 122.00 0.48 Local Coord Referenced To: Well Head MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude Comments IN) 19 (1 (it) Ift) (ft) Iftl (ft) (ft) Oil 1'110011t) (ftus) MU51 f9 P/ RTE 0.00 0.00 0.00 -96.11 0.00 0.00 000 0.00 0.00 0.00 N/A 5959239.94 600003.45 70.29805226 -149.19014189 40.01 0.00 0.00 -56.10 40.01 0.00 0.00 0.00 0.00 0.00 0.00 5959239.94 600003.45 70.29805226 -149.19014189 122.00 0.48 343.00 25.89 122.00 0.31 0.34 0.34 033 -0.10 0.59 5959240.27 600003.35 70.29805315 -149,19014270 176.00 0.21 321.72 79.89 176.00 0.58 0.67 0.66 0.62 -0.23 0.55 5959240.56 600003.21 70.29805396 -149.19014373 269.00 0.49 198.51 172.89 269.00 0.30 1.08 0.60 0.36 -0.46 0.68 5959240.31 600002.99 70.29805329 -149.19014561 36100 0.79 136.25 264.88 360.99 -0.47 2.01 0.48 445 -0.15 077 5959239.49 600003.31 70.29805102 -149.19014307 454.00 1.26 143.82 357.87 453.98 -1.57 3.67 1.96 -1.74 0.90 0.52 5959238.21 600004.37 70.29804750 -149.19013459 547.00 1.85 14006 450.83 546.94 -3.26 6.20 4.46 -372 2.47 0.64 5959236.26 600005.97 70.29604210 -149.19012190 610.00 2.04 146.84 513.80 609.91 -4.74 8.33 6.59 -544 3.73 0.47 5959234.56 60000726 70.29903741 -149.19011165 677.00 3.16 154.86 580.73 676.84 -7.14 11.37 9.61 -8.11 5.17 1.75 5959231.90 600008.73 70.29803011 -149.19010001 740.66 3.75 165.16 644.27 740.38 -10.46 15.19 1337 -11.71 6.45 1.34 5959228.32 600010.05 70.29802028 -149.19008966 773.07 3.87 171.95 676.61 772.72 -12.49 17.34 15.43 -13.81 6.87 1.44 59.59226.22 600010.51 70.29001452 -149.19008622 866.66 4.54 196.60 770.15 866.26 .19.19 24.12 21.44 -20.51 6.26 2.04 5959219.52 600009.96 70.29799624 -149.19009122 928.86 5.29 20449 831.95 928.06 -24,39 29.42 . 25.83 -25,46 4.37 1.63 5959214.54 600008.16 70.29798270 -149.19010649 992.38 4.86 203.33 895.20 991.31 -29.83 35.04 30.67 -30.59 2.09 0.70 5959209.38 600005.95 70.29796868 -149.19012495 1052.80 6.03 201.24 955.34 1051.45 -35A2 40.77 35.90 -35.90 -0.07 1.96 5959204.04 600003.86 70.29795418 -149.19014246 1116.11 7.08 199.34 1018.24 1114.35 -42.52 48.00 42.76 -42.68 -2.57 1.69 5959197.23 600001.45 70.29793565 -149.19016266 1178.93 9.25 199.95 1080.42 1176.53 -51.30 56.92 51.39 -51.08 -5.57 3.46 5959188.79 599998.56 70.29791270 -149.19018701 1242.68 11.93 207,04 1143.08 1239.19 -62.63 66.62 62.63 -61.77 -10.32 4.67 5959178.04 599993.96 70.29788350 -149.19022543 1305..89 14.79 213.98 1204.58 1300.69 -76.20 83.21 7639 -74.28 -17.80 5.18 5959165.43 599986.64 70.29784932 -149.19028601 1369.55 17.35 216.28 1265.74 1361.85 -92.08 100.82 92.98 -88.68 -27.96 4.14 5959150.91 599976.68 70.29781000 -149.19036826 1432.68 18.73 219.29 1325.96 1422.07 -109.34 120.43 111.57 -104.16 -39.99 2.63 5959135.27 599964.86 70.29776770 -149.19046566 1496.11 20.04 209.06 1385.62 1481.73 -128.36 141.37 132.03 .121.49 -51.68 5.75 5959117.78 599953.39 70.29772035 -149.19056036 1559.66 19.62 203.31 1445.41 1541.52 -148.99 162.91 153.53 -140.81 -61.19 3.14 5959098.34 599944.14 70.29766758 -149.19063737 1622.69 20.09 201.54 1504.69 1600.80 -169.86 184.32 174.93 -160.60 -69.36 1.21 5959078.45 599936.24 70.29761352 -149.19070346 1686.35 2015 202.69 1564.35 1660.46 -191.53 206.53 197.14 -181.17 -77.72 121 5959057.77 599928.16 70.29755731 -149.19077119 174926 19.97 201.23 1623.33 1719.44 -212.90 228.41 219.02 -201.47 -85.91 1.48 5959037.37 599920.24 70.29750186 -149.19083749 1812.69 18.42 195.16 1683.24 1779.35 -233.48 249.25 239.78 -221.24 -92.45 3.98 5959017.51 599913.96 70.29744785 -149.19089048 1908.01 18.79 194.16 1773.58 1869.69 -263.77 279.66 269.93 -250.66 -100.15 0.51 5958987.99 599906.66 70.29736747 -149.19095277 2001.40 17.57 195.06 1862.31 1958.42 -292.79 306.80 298.86 -278.86 -107.49 1.34 5958959.70 599899.69 70.29729044 -149.19101222 2096.71 19.40 195.68 1952.69 2048.80 -322.85 339.01 328.94 -307.99 -115.51 1.93 5958930.47 599892.06 70.29721085 -149.19107712 2192.61 20.96 195.80 2042.70 2138.81 -355.74 37210 361.91 -339.83 -124.48 1.63 5958898.51 599883.51 70.29712386 -149.19114979 2288.70 21.16 195.68 2132.38 2228.49 -390.06 406.63 396.35 -373.07 -133.85 021 5958865.16 599874.59 70.29703306 -149.19122563 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD\Z-6912-6912-69 10/9/2012 2:09 PM Page 1 of 4 MD Incl Azim True TVDSS TVD VSEC AND Closure NS EW DLS Northing Easting Latitude Longitude Comments (81 1.1 19 (ft) Ift) (ft) (ft) (ft1 (fit (ft) (0I100ft) Iftu31 IftuS) 2383.33 20-99 196.32 2220.68 231679 -423.87 440-65 430.31 -405.78 -143.23 0.30 5958832.33 599865.65 70.29694370 -149.19130156 2478.39 2068. 196.19 2309.52 2405.63 -457.45 474-46 464.07 -438.23 -152.69 0.33 5958799.75 599856.62 70.29685503 -149.19137819 2574.41 2043 194.89 2399.43 2495.54 -490.98 508.18 497.72 -470.71 -161.72 0.54 5958767.16 599848.02 70.29676630 -149.19145132 2668.62 2021 194.89 2487.78 2583.89 -523,55 540.89 530.36 -502.33 -170.13 0.23 5958735.44 599840.03 70.29667992 -149.19151939 2763.65 17.81 196.84 2577.62 2673.73 -554.31 571.84 561.27 -532.11 -178.56 2.61 5958705.55 599832.00 70.29659857 -149.19158763 2858.44 15.05 194.04 2668.53 2764.64 -580.96 598.64 588.03 -557.93 -185.75 3.03 5958679.60 599825.16 70.29652804 -149.19164582 2952.92 11.55 198.81 2760.46 2856.57 -602.53 620.36 609.73 -578.79 -191.77 3.88 5958658.70 599619.41 70.29647105 -149.19169461 3017.33 9.78 200.43 2823.76 2919.87 -614.27 632.28 621.65 -590.02 -195.76 2.79 5958647.42 599815.57 70.29644036 -149.19172691 3080.20 8.44 197.04 2885.83 2981.94 -624.09 642.23 631.60 -599.43 -198.98 2.30 5958637.97 599812.48 70.29641464 -149.19175295 3142.97 5.93 194.91 2948.11 3044.22 .631.88 650.08 639.44 -606.97 -201,16 4.02 5956630.40 599810.40 70.29639404 -149.19177063 3206.33 3.63 200.94 3011.24 3107.35 -637-11 655.36 644.71 -612.01 -202.72 3.71 5958625.34 599808.91 70.29638028 -149.19178326 3249.79 3.81 216.81 3054.61 3150.72 -639.74 658.16 647.46 -614.45 -204,08 2.40 5958622.86 59980758 70.29637362 -149.19179424 9.518• 3269.00 3.70 223.56 3073.78 316989 -640.82 659.42 648.62 .615.41 -20489 2.37 5958621.91 59980679 70.29637099 -149.19180080 T 3313.68 3.67 240.06 3118.37 321448 -642.93 66227 651.00 -617.17 -207.12 2-37 5958620.12 599004.58 70.29636618 -149.19181889 3376.78 4.57 235.36 3181.31 3277.42 -645.96 666.80 654.53 -619.61 -210.94 1.52 5958617.64 599800.79 76.29635953 -149.19184980 3439.74 5.43 269.86 3244.04 3340.15 -648.21 672.13 657.53 -621.04 -215.99 4.88 5958616.14 599795.77 70.29635561 -149.19189064 3503.14 7.21. 293.23 3307.06 3403.17 -647.77 679.01 658.27 -619.48 -222.64 4.88 5958617-61 599789.09 7029635988 -149.19194454 3566.44 7.83 305.86 3369.82 3465.93 -644.91 687.26 656.89 -615-39 -229.79 2.78 5958621.61 599781.89 70.29637106 -149.19200239 3629.23 9.76 321-87 3431.88 3527.99 --639.4& 696.80 653.04 -608.69 -236.54 4.94 595862821 599775.05 7029638934 -149.19205708 3699.84 10.35 338-18 3501.42 3597.53 -629.98 709.05 645.42 -598.09 -242.60 4.10 5958638.73 599768.85 70.29641830 -149.19210610 3763.54 10.22 347,77 3564.10 3660.21 -619.84 720.40 636.67 -587.25 -245.92 2.69 5958649.51 599765.39 70.29644790 -149.19213302 3826.99 10.54 358.58 3626.52 3722.63 -608.91 731.80 626.79 -575.95 -247.26 3.11 5958660.80 59976390 70.29647878 -149.19214384 3889.65 12.38 7,95 3687.93 3794.04 -596.57 744,22 615.11 -563.57 -246.47 4.17 5958673.19 599764.52 70.29651261 -149.19213747 3952.95 14.55 7.78 3749.49 3845.60 -581.84 758.96 600.96 -548.96 -244.54 3,44 5958687.83 599766.26 70.29655253 -149.19212183 4016.26 16.51 10.36 3810.48 3906-59 -564.90 775.91 584.62 -532.22 -241.93 3.37 5958704-60 599768.65 70.29659827 -149.19210069 4079.49 16.43 12.53 3870.80 3966.91 -545.93 194.89 566.14 -513,62 -238.14 3.21 5958723.24 599772.19 70.29664907 -149.19207005 4144.04 2014 12.91 3931.70 4027.81 -524.59 816.26 545.27 -492.78 -233.43 2.81 5958744.15 599776.62 7029670602 -149.19203193 4203.83 2262 12.55 3987.35 4083.46 -502.79 838.10 523.98 471.47 -228.62 3.99 5958765.51 599781.14 70.29676423 -149.19199299 4270.78 23.79 9.98 4048.89 4145.00 -476.42 864.46 498.50 -445.60 -223-48 2.31 5958791.45 599785.93 70.29683490 -149.19195140 4333.66 25.48 6.67 4106.05 4202.16 -450.23 890.68 473.71 -419.67 -219.72 3.47 5958817.42 599789.36 70.29690573 -149.19192088 4397.75 27.48 6.11 4163.41 4259.52 -421.70 919.25 447.20 -391.27 416.54 3.14 5958845.85 599792.15 70.29698331 -149.19189518 4460.97 29.98 8.24 4218.64 4314.95 -391.34 949.64 419.13 -361.13 -212.72 4.27 5958676.04 599795.57 70.29706566 -149.19186428 4523.54 31.96 8.30 4272.49 4368.60 -359.15 981.83 389.52 -329.27 -2D8.09 3.16 5958907.96 599799.78 70.29715270 -149.19182679 4588.04 33.95 674 4326.61 4422.72 -324.09 1016.92 357.97 -294.49 -203.51 3.35 5956942.79 599803.89 7029724772 -149.19178972 4651.03 36.50 6.70 4378.06 4474.17 -287.81 1053.25 326.32 -258.41 -199.26 4.05 5958978.92 599807.66 70.29734629 -149.19175531 4714.13 37.85 5.11 4426.34 4524.45 -249.76 1091,37 294.58 -220.49 -195.35 2.63 5959016.89 599811.07 70.29744989 -149.19172363 4777.84 40.08 3.52 4477.88 457399 -209.87 1131.43 263.80 -180.54 -192.35 3.84 5959056.87 599813.54 70.29755902 -149.19169934 4841.28 42.64 247 4525.49 4621,60 -168.22 1173.35 235.36 -138.68 -190.17 4.18 5959098.75 599815.16 7029767338 -149.19168169 4905.26 44.97 3.12 4571.66 4667.77 -124.24 1217.63 210.40 -94.45 -188.00 3.71 5959143.00 599816.74 70.29779422 -149.19166417 4966.79 46.98 1.89 4615.81 4711.92 -78.91 126331 192.31 -48.82 -186.01 3.46 5959188.65 599818.12 70-29791888 -149.19164809 5032.24 48.38 1.86 4658.53 4754.64 -32.41 1310.22 184.49 -1.93 -184.48 2.21 5959235.56 599819.03 7029804698 -149.19163567 5095.61 49.90 1.37 4699.98 4796.09 15.06 1358.15 188.81 45.96 -183.13 2.47 5959283.47 599819.74 70.29817785 -149.19162476 5159.29 51.87 0.84 4740.16 4836.27 63.93 1407.55 20564 95.37 -182.18 3.16 5959332.87 599820.03 70.29831280 -149.19161708 5222.61 53.87 1.30 4778.38 4874.49 113.86 1458.03 232.63 145.84 .181.24 3.21 5959383-35 599820.31 70.29845069 -149.19160943 5286.DD 54-60 2.43 4815.43 4911.54 164.84 1509.47 266.74 19225 -179.58 1.85 5959434.77 599821.30 70.29859113 -149.19159587 5348.99 55.66 3.12 4851.44 4947.55 216.16 1561.15 305.43 248.87 -177.06 1.91 595948641 599823.11 70.29873214 -149.19157560 5412.77 57.14 3.72 4886.73 4982.84 268.98 161427 348.39 301.90 -173.88 2.45 5959539.47 599825,58 70.29887701 -149.19154993 5476.17 57.78 4.61 4920.84 5016.95 322.20 1667.72 393.79 355.20 -170.00 1.56 5959592.82 599828.75 70.29902263 -149.19151850 5539.26 57.65 5.45 4954.53 505064 375.37 1721,05 440.53 408.33 -165.33 1.14 5959646.00 599832.72 70.29915778 -149.19148064 56D2.42 58.00 5.98 4988,17 5084.28 42871 1774,51 488.47 461.53 -160.00 0.90 5959699.25 599837.34 70.29931310 -149.19143754 5665.92 56.71 5.37 5022.42 5118.53 482.06 1827.98 537.48 514.73 -154.71 2.19 5959752.52 599841.92 70.29945846 -149.19139472 5728.71 54.51 6.39 5057.88 5153,99 533.76 1879.79 585.65 566.27 -149.41 3.75 5959804.12 599846.53 70.29959926 -149.19135179 5791.90 54.31 594 5094.66 5190.77 585.06 1931.18 633.91 617.36 -143.89 0.66 5959855.27 599851.37 70.29973883 -149.19130711 585546 55.07 6-09 5131.40 5227.51 636.83 1983.05 683.12 668.94 -138.46 1.21 5959906.92 599856.12 70.29987974 -149.19126310 5918.15 55.18 6.39 5167.24 5263.35 688.18 2034.48 73222 720.07 -132.87 0,43 5959958.11 599861.03 70.30001942 -149.19121764 Drilling Office 2.6.1120.0 Prudhoe Bay Unit- WOA1Z-PAD1Z-69\Z-691Z-69 10/9/2012 2:09 PM Page 2 of 4 MD Incl Azim True TVDSS TVD VSEC AHD closure NS EW OLS Northing Easting Latitude Longitude Comments (ft) 19 (•1 (R) (ft) (it) MI (R) iftt ittl (°f100ftt (RUst (Rust (°I M 5981.31 54.69 6.48 5203.53 5299.64 739.80 2086.17 781.83 771.44 -127.07 0.78 5950009.55 599866.14 70.30015976 -149.19117093 6045.02 53.44 5.70 5240.92 5337.03 791.29 2137.76 831.67 822.73 -121.60 2.20 5960060.90 599870.93 70.30029988 -149.19112660 6108.28 53.78 5.86 527645 5374.56 842.11 2188.68 881.12 873.39 -116.47 0.57 5980111.63 599875.38 70.30043830 -149.19108507 617137 54.15 6.10 5315.80 5411.91 893.35 2240.02 931.11 924.46 -111.12 0.66 596016275 599880.05 70.30057780 -149.19104176 6235.48 54.25 6.13 5353.07 5449.18 944.93 2291.70 981.53 975.83 -105.62 0.16 5960214.19 599884.87 70.30071816 -149.19099719 6297.92 54.43 6,49 5389.47 5485.58 995.58 2342.43 1031.12 1026.26 -100.04 0.55 5960264.68 599089.77 70.30085591 -149.19095204 6392.43 54.74 6.77 544423 5540.34 1072.51 2419.45 1106.53 1102.77 -91.15 0.41 5960341.30 599897.65 70.30106493 -149.19088002 6487.56 55.41 6.09 5498.70 5594.81 1150.39 249745 1183.15 1180.27 -82.41 0.92 5960418.90 599905.35 70.30127667 -149.19080931 6582.52 55.96 6.11 5552.23 5648.34 1228.68 2575.88 1260.44 1256.26 -74.08 0.58 5960496.99 599912.64 70.30148973 -149.19074162 6676.60 54.18 6.17 5606.10 570221 1305.68 2653.01 1336.57 1334.95 -65.83 1.89 5960573.77 599919.87 70.30169923 -149.19067502 6771.70 51.69 5.89 5663.41 5759.52 1381.42 2728-69 1411.59 1410.41 -57.86 2.63 5960649.32 599926.84 70.30190538 -149.19061044 6866.91 49.48 7.58 5723.86 5819.97 1454.08 2602.44 1484.26 1483.45 -49.25 2.70 5960722.47 599934.47 70.30210492 -149.19054073 6961.62 47.59 9.20 5786.57 5882.68 1525.03 2873.40 1554.14 1553.65 -38.91 2.37 5960792.80 599943.88 70.30229672 -149.19045699 7056.39 44.42 10.06 5852.39 5948.50 1593.99 2941.57 1621.10 1620.86 -27.52 3.41 5960860.15 599954.37 70-30248033 -149.19036474 7151,36 40.25 11.54 5922.58 6018.69 1657.92 3005.51 1693.75 1683.68 -15.57 4.51 5960923.11 599965.48 70.30265193 -149.19026797 7245.49 38.93 12.21 5995.12 6091.23 1717.86 3065.50 1742.38 1742.38 -3.23 1.47 5960981.97 599977.04 70.30281231 -149.19016804 7278.32 38.20 12.35 6020.79 6116.90 1738.30 3085.97 1762.38 1762.38 1.12 224 5961002.02 599981.12 70.30286694 -149.19013278 7334.68 37.32 14.02 6065.35 6161.46 1772.74 3120.48 1796.00 1795.98 8.99 2.39 5961035.72 599980.54 70.30295873 -149.19006907 7429.20 38.29 15.84 6140.03 6236.14 1830.41 3178.41 1852.11 1851.95 23.93 1.56 5961091.88 600002.73 70-30311165 -149.18994810 7524.05 38.21 14.73 6214.52 6310.63 1088.83 323713 1909.00 1908.59 39.41 0.73 5961148.72 600017.45 70.30326639 -149.18982272 7619.30 38.37 15.00 6289.28 6385.39 1947.60 3296.15 1966.40 1965.64 54.55 0.24 5961205.95 600031.83 70.30342223 449.18970008 7714.31 38.00 14.32 6363.96 6460.07 2006.09 3354.89 2023.65 2022.46 69.41 0.59 5961262.96 600045.94 70.30357747 -149.18957967 7809.35 37.92 13.71 6438,89 6535.00 2064.37 3413.35 2080.86 2079.18 83.57 0.40 5961319.86 600059.34 70.30373242 -149.18946500 7904.52 37.33 17.04 6514.28 6610.39 2122.15 3471.44 2137.48 213519 98.96 2.22 5961376.06 600073.98 70.30388542 -149.18934035 7999.39 37.79 14.93 6589.48 6685.59 2179.61 3529.26 2193.79 2190.78 114.88 1.44 5961431.85 600089.16 70.30403729 -149.18921141 8094.13 37.61 15.07 6664.44 6760.55 2237.28 3587.20 2250.49 2246.74 129.87 0.21 5961488.01 600103.41 70.30419017 -149.18908995 8189.45 37.21 15.01 6740.16 6836.27 2294.92 3645.11 2307.22 2302.66 144.90 0.42 5961544.12 600117.69 70.30434295 -149.18896823 8283.72 36.42 15.09 6815.63 6911.74 2351.15 3701.60 2362.61 2357.22 159.57 0.84 5961596.86 600131.62 70.30449198 -149.18884941 8379.68 35.90 14.28 6893.10 6989.21 2407.54 3758.22 2418.25 2411.99 173.92 0.74 5961653.81 600145.25 70.30464161 -149.18673312 8474.81 39.35 15.08 6968.44 7064.55 2465.37 3616.28 2475.35 2468.15 188.65 3.66 5961710.16 600159.23 70.30479505 -149.18861380 8569.34 3921 14.91 7041.61 7137.72 2524.94 3876.13 2534.20 2525.96 204.14 0.19 5961768.17 600173.94 70.30495298 -149.18848836 8664.59 3635 18.42 7116.89 7213.00 2582.82 3934.47 2591.28 2581.85 220.81 .3.76 5961824.27 600189.87 70.30510568 -149.18835331 8758.74 35.35 18.46 7193.21 7289.32 2637.29 398961 2644.92 2634.16 238.25 1.06 5961876.60 600206.61 70.30524858 -149.10821202 8853.41 34,54 19.02 7270.81 7366.92 2690.82 4043.83 2697.66 2685.51 255.67 0.92 5961928.38 600223.34 70.30538886 -149.18807091 8946.90 34.41 19.19 7349.53 7445.64 2744.12 4097.88 2750.21 2736.59 273.36 0.17 5961979.68 600240.35 70.30552839 -149.18792760 9043.72 34.18 16.74 7427.86 7523.97 2796.82 4151.31 2802.24 2787.12 290.72 0.36 5962030.42 600257.04 70.30566642 -149.18778693 9139.36 34.04 18.74 7507.05 7603.16 2849.76 4204.94 2851.57 2837.91 307.96 0.15 5962061.43 600273.59 7630580518 -149.18764734 9234.11 34.00 17.93 7585.58 7681.69 2902.14 4257.95 2906.41 2888.22 324.63 0.48 5962131.97 600289.59 70.30594264 -149.18751224 9329.00 33.48 17.74 7664.49 7760.60 2954.29 4310.66 2956.09 2938.40 340.77 0.56 5962182.34 600305.07 70.30607970 -149.18738146 9424.71 33,24 18.35 7744.43 7840.54 3006.34 4363.29 3009.69 2988.44 357.08 0.43 5962232.59 600320.70 70.30621641 -149.18724939 9519.44 33.54 17.16 7823.52 7919.63 3057.93 4415.42 3060.89 3036.09 372.97 0.76 5962282.44 600335.93 70.30635205 -149.18712061 9614.57 33.67 19.08 7902.76 7998.87 3109.99 4468.07 3112.57 3088.12 389.35 1.13 5962332.69 600351.64 70.30648873 -149.18698795 9708.50 35.36 20.68 7980.15 8076.26 3162.33 452129 3164.50 3138.16 407,46 2.04 5962362.96 600389.08 70.30662543 -149.18684121 9804.54 34.84 20.59 8058.73 8154.84 3216.52 4576.51 3218.28 3189.84 426.92 0.54 5962434.89 600387.85 70.30676662 -149.18668354 9899.20 34.14 20.12 B135.75 8232.86 3269.17 4630.11 3270.59 3240.09 445.56 0.79 5962465.36 600405.82 70.30690390 -149.18653246 9994.47 33.95 19.69 8215.69 8311.80 3321.63 4683.45 3322.76 3290.24 463.72 0.32 5962535.76 600423.31 70.30704091 -149.18638533 10089.24 35.57 19.19 8293.54 8389.65 3374.85 4737.48 3375.74 3341.19 481.70 1.74 5962586.95 600440.61 70.30718010 -149.18623967 10183.70 35.39 16.61 8370.46 8468.57 3428.94 4792.30 3429.63 3393.06 499.46 0.40 5962639.04 600457.67 70.30732180 -149.18609577 10215.15 35.28 19.12 8396.12 8492.23 3446.89 4810.49 3447.51 3410.28 505.34 1.00 5962656.33 600463,33 70.30736882 -149.18604812 7° 10280.00 36.33 19,31 8440.71 8544.82 3484.29 4848.43 3464.79 3446.10 51783 1.63 5962692.31 60047533 70.30746669 -149.18594695 10310.10 36.82 19.39 8472.89 8569.00 3501.96 4866.37 3502.41 3463.03 523.77 1.63 5962709.31 600481.05 70.30751292 -149.18589880 10332.58 36.03 19.93 8490.97 8567.08 3515.10 4879.72 3515.51 3475.59 528.26 3.79 5962721.94 600485.37 70.30754726 -149.18586242 10363.98 31.63 21.67 8517.05 8613.16 3532.24 4897.19 3532.60 3491.94 534.45 14.35 5962738.36 600491.34 70.30759190 -149.18581226 10395.98 29.72 22.43 8544.57 8640.68 3548.18 4913.52 3548.49 3507.07 540.58 6.09 5962753.57 600497.27 70.30763324 -149.16576262 10427.08 29.51 22.62 8571.61 8667.72 3563.15 4928.89 3563.42 3521.26 546.47 0.74 5962767.84 600502.96 70.30767202 -149.18571492 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA1Z-PAD\Z-691Z-6912-69 1019/2012 2:09 PM Page 3 of 4 Comments MD Ift) Incl hl Azim True ('1 TVDSS in) TVD (ft) VSEC (M AHD M) Closure NS (ft) (ft) EW DLS (ft) PI100ht Northing Muss Easting thus) Latitude Longitude PI (9 GRS Survey Corrections 10521.61 28.92 18.88 8654.12 8750.23 3608.38 4975.01 3608.55 3564.39 562.82 2.03 5962811.18 600518.74 70.30778982 -149.18558242 10616.58 29.00 18.43 8737.22 8833.33 3653.78 5021.00 3653.88 3607.95 577.53 0.24 5962854.93 600532.87 70.30790885 -149.18546324 10711.05 27.55 16.09 8820-42 8916.53 3698.12 5065.74 3698.18 3650.67 590.82 1.93 5962897.82 600545.59 70.30802555 -149.10535550 10806.42 25.68 16.35 8905.68 9001.79 3740.55 5108.46 3740.58 3691.70 602.75 1.96 5962939.00 600556.97 70.30813762 -149.18525882 10901.39 25.21 15.52 8991.43 9087.54 3781.09 5149.27 3781.11 3730.93 613.96 0.62 5962978.37 600567.65 70.308244110 -149.18516802 10964.69 24.66 12.36 9048.84 9144.95 3807.69 5175.95 3807.70 3756.82 620.39 2.28 5963004.34 600573.74 70.30831553 -149.18511588 TD 11021.00 24.66 12.36 9100.01 9196.12 3831.16 5199.44 3831.17 3779,77 625.42 0.00 5963027.36 600578.47 70.30837823 -149.18507512 Survey Error Model; ISCWSA Rev 0-3-0, 95.000% Confidence2,7955sigma Survey Program: Description MD From MD To EDU Fmq Hole Sim Casing Diameter Ift)IIt Ift) (in) (in) Survey Tool Type Borehole l Survey 0.000 40.010 Act s 12.250 9.625 UNDEFINED Z-691 Z-69 40.010 677.000 Act Sins 12.250 9.625 GYD-GC-SS Z-69/ Z-69 677.000 3206.330 Act Stns 12.250 9.625 MWD+IFR+MS Z-691 Z-69 3206.330 3313.680 Act Stns 8.750 7.000 INC+TREND Z-691 Z-69 3313.680 10215.150 Act Stns 8.750 7.000 MWD+IFR+MS Z -69/Z-69 10215.150 10964.690 Act Stns 6.125 4.500 MWD+IFR+MS Z-691 Z-69 10964.690 11021,000 Act Stns 6.125 4.500 BLIND Z-691 Z-69 Legal Description: Northin (Y) Easfing (X) Surface: 4432.3 FSL 2671,8 FEL S19 T11N R12E UM 940 660003.40 BHL 2932 FSL 2032 FEL 18 T11N R12EUM 5963027.360 600578.470 Drilling Office 2.6.1120.0 Prudhoe Bay Unit. - WOA1Z-PAD\Z-6912-69\Z-69 10!912012 2:09 PM Page 4 of 4 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. R+ Yes 0 No I have checked to the best of my ability that the following data is correct: O Surface Coordinates Declination & Convergence GRS Survey Corrections ❑+ Survey Tool Codes SLB DE: Client Representative: Dale: Jd/I J 2-0 (2 - Drilling Office 2.6.1120.0 Prudhoe Bay Unit. - WOA1Z-PAD\Z-6912-69\Z-69 10!912012 2:09 PM Page 4 of 4 Z-69 ASP Final Survey Report (Def Survey) ' r� - 0 Schlumberger Report Date: October 05, 2012- 10:30 AM Survey I DLS Computation: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 9.519 ° (True North) Field: Prudhoe Bay Unit - WOA Vertical Section Origin: 0.000 ft, 0.000 ft Structure I Slot: Z -PAD / Z-69 (NJ) TVD Reference Datum: Rotary Table Well: Z-69 TV0 Reference Elevation: 96.110 ft above MSL Borehole: Z-69 Seabed I Ground Elevation: 56.100 ft above MSL API/I: 50.029.23471-00 Magnetic Declination: 20.552 ° Survey Name: Z-69 Total Gravity Field Strength: 1002.6731 mgn (9.8 based) Survey Date: October 04, 2012 Total Magnetic Field Strength: 57618.010 nT Tort I AHD I DDI I ERD Ratio: 207.616 ° 15199.443 ft / 6.112 / 0.565 Magnetic Dip Angle: 80.965 ° Coordinate Reference System: NAD27 Alaska State Plane, Zone 04, US Feet Declination Date: October 01, 2012 Location Lat / Long: N 70° 17' 52.98812", W 149° 11' 24.51079" Magnetic Declination Model: BGGM 2012 Location Grid N/E WX: N 5959239.940 ItUS, E 600003.450 ItUS North Reference: True North CRS Grid Convergence Angle: 0.7625 ° Grid Convergence Used: 0.0000 ° Grid Scale Factor: 0.99991136 Total Corr Mag NorthaTrue North:' 20.5522 ° 122.00 0.48 Local Coord Referenced To: Well Head Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude _ (ft) f°1 1°I Iftl (ft) fill Iftl (ft) Iftl (ftl V1100ft) IftUSI IftuSl 11 1.) RTE 0.00 0.00 0,00 -96.11 0.00 0.00 0.00 0.00 0.00 0.00 N/A 5959239.94 600003.45 70.29805226 -149.19014169 40.01 0.00 0.00 -56.10 40.01 0.00 0.00 0,00 0,00 0.00 0.00 5959239.94 600003.45 70.29805226 -149.19014189 122.00 0.48 343.00 25.89 122.00 0.31 0.34 0.34 0.33 -0.10 0.59 5959240.27 600003.35 70.29805315 -149.19014270 176.00 0.21 321.72 79.89 176.00 0.58 0.67 0.66 0,62 -0.23 0.55 5959240.56 600003.21 70.29805396 -149.19014373 269.00 0.49 198.51 172.89 269.00 0.30 1.08 0.60 0.38 -0.46 0.68 5959240.31 600002.99 70.29805329 -149.19014561 361,00 0.79 136,25 264.88 360.99 -0.47 2.01 0.48 -0,45 -0.15 0.77 5959239.49 600003.31 70.29805102 -149.19014307 454.00 1.26 143.82 357.87 453.98 -1.57 3.67 1.96 -1.74 0.90 0.52 5959238.21 600004.37 70.29804750 -149.19013459 547.00 1.85 140.06 450.83 546.94 -3.26 6.20 4.46 -3.72 2.47 0.64 5959236.26 600005.97 70.29804210 -149.19012190 610.00 2.04 146.84 513.80 609.91 -4.74 8.33 6.59 -5.44 3.73 0.47 5959234.56 600007.26 70.29803741 -149.19011165 677.00 3.16 154.86 580.73 676.84 -7.14 11.37 9.61 -8.11 5.17 1.75 5959231.90 600008.73 70.29803011 -149.19010001 740.66 3.75 165.16 644.27 740.36 -10.48 15.19 13,37 -11.71 6.45 1.34 5959228.32 600010.05 70.29802028 -149.19008966 773.07 3.87 171.95 676.61 772.72 -12.49 17.34 15.43 -13.81 6.87 1.44 5959226.22 600010.51 70.29801452 -149.19008622 866.86 4.54 196.60 770.15 866.26 -19.19 24.12 21.44 -20.51 6.26 2.04 5959219.52 600009.98 70.29799624 -149.19009122 928.88 5.29 204.49 831.95 928.06 -24.39 29.42 25.83 -25.46 4.37 1.63 5959214.54 600008.16 70.29798270 -149.19010649 992.36 4.86 203.33 895.20 991.31 -29.83 35.04 30.67 -30.59 2.09 0.70 5959209.38 600005.95 70.29796868 -149.19012495 1052.80 6.03 201.24 955.34 1051.45 -35.42 40.77 35.90 -35.90 -0.07 1.96 5959204.04 600003.86 70.29795418 -149.19014246 1116.11 7.08 199.34 1018.24 1114.35 -42.52 48.00 42.76 -42.68 -2.57 1.69 5959197.23 600001.45 70.29793565 -149.19016268 1178.93 9.25 199.95 1080.42 1176.53 -51.30 56.92 51.39 -51.08 -5.57 3.46 5959188.79 599998.56 70.29791270 -149.19018701 1242.68 11.93 207.04 1143.08 1239.19 -62.63 68.62 62.63 -61.77 -10.32 4.67 5959178.04 599993.96 70.29788350 -149.19022543 1305.89 14.79 213.98 1204.58 1300.69 -76.20 83.21 76.39 -74.28 -17.80 5.18 5959165.43 599986.64 70.29784932 -149.19028601 1369.55 17.35 216.28 1265.74 1361.85 -92.08 100.82 92.98 -88.68 -27.96 4.14 5959150.91 599976.68 70.29781000 -149.19036828 1432.88 18.73 219.29 1325.96 1422.07 -109.34 120.43 111.57 -104.16 -39.99 2.63 5959135.27 599964.86 70.29776770 -149.19046566 1496.11 20.04 209.06 1385.62 1481.73 -128.36 141.37 132.03 -121.49 -51.68 5.75 5959117.78 599953.39 70.29772035 -149.19056036 1559.66 19.62 203.31 1445.41 1541.52 -148.99 162.91 153.53 -140.81 -61.19 3.14 5959098.34 599944.14 70.29766758 -149.19063737 1622.69 20.09 201.54 1504.69 1600.80 -169.86 164.32 174.93 -160.60 -69.36 1.21 5959078.45 599936.24 70.29761352 -149.19070346 1686.35 20.75 202.69 1564.35 1660.46 -191.53 206.53 197.14 -181.17 -77.72 1.21 5959057.77 599928,16 70.29755731 -149.19077119 1749.26 19.97 201.23 1623.33 1719.44 -212.90 226.41 219.02 -201.47 -85.91 1.48 5959037.37 599920.24 70.29750186 -149.19083749 1812.69 18.42 195.16 1663.24 1779.35 -233.48 249.25 239.78 -221.24 -92.45 3.98 5959017.51 599913.96 70.29744785 -149.19089048 1908.01 18.79 194.16 1773.58 1869.69 -263.77 279.66 269.93 -250.66 -100.15 0.51 5958987.99 599906.66 70.29736747 -149.19095277 2001.40 17.57 195.06 1862.31 1958.42 -292.79 308.80 298.86 -276.86 -107.49 1.34 5958959.70 599899.69 70.29729044 -149.19101222 2096.71 19.40 195.68 1952.69 2048.80 -322.85 339.01 328.94 -307.99 -115.51 1.93 5958930.47 599892.06 70.29721085 -149.19107712 2192.61 20.96 195.80 2042.70 2138.81 -355.74 372.10 361.91 -339.83 -124.48 1.63 5956698.51 599883.51 70.29712386 -149.19114979 2288.70 21.16 195.68 2132.38 2228.49 -390.06 406.63 396.35 -373.07 -133.85 0.21 5958865.16 599874.59 70.29703306 -149.19122563 2383.33 20.99 196.32 2220.68 2316.79 -423.87 440.65 430.31 -405.78 -143.23 0.30 5958832.33 599865.65 70.29694370 -149.19130156 2478.39 20.68 196.19 2309.52 2405.63 -457.45 474.46 464.07 -438.23 -152.69 0.33 5958799.75 599856.62 70.29685503 -149.19137819 2574.41 20.43 194.89 2399.43 2495.54 -490.98 508.18 497.72 -470.71 -161.72 0.54 5958767.16 599848.02 70.29676630 -149.19145132 2668.62 20.21 194.89 2487.78 2583.89 -523.55 540.89 530.36 -502.33 -170.13 0.23 5958735.44 599840.03 70.29667992 -149.19151939 2763.65 17.81 196.84 2577.62 2673.73 -554.31 571.84 561.27 -532.11 -178.56 2.61 5958705.55 599832.00 70.29659857 -149.19158763 2858,44 15.05 194.04 2668.53 2764.64 -580.96 598.64 588.03 -557.93 -185.75 3.03 5958679.64 599825.16 70.29652804 -149.19164582 2952.92 11.55 198.81 2760.46 2856.57 .602.53 620.36 609.73 -578.79 -191.77 3.88 5958658.70 599819.41 70.29647105 -149.19169461 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD1Z-69\Z-6912-69 10/9/2012 1:44 PM Page 1 of 3 Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude Iftl 3017.33 M 9.78 111 200.43 Iftl 2823.76 Iftl 2919.87 Iftl -614.27 Iftl 632.28 Iftl 621.65 Iftl -590.02 Iftl -195.76 (*1`1001"t) 2.79 I@USI 5958647.42 IftUSI 599815.57 1 1 70.29644036 1 ) -149.19172691 3080.20 8.44 197.04 2885.83 2981.94 -624.09 642.23 631.60 -599.43 -198.98 2.30 5958637.97 599812.48 70.29641464 -149.19175295 3142.97 5.93 194.91 2948.11 3044.22 -631.88 650.08 639.44 -606.97 -201.16 4.02 5958630.40 599810.40 70.29639404 -149.19177063 3206.33 3.63 200.94 3011.24 3107.35 -637.11 655.36 644.71 -612.01 -202.72 3.71 5958625.34 599808.91 70.29638028 -149.19178326 3249.79 3.81 216.81 3054.61 3150.72 -639.74 658.16 647.46 -614.45 -204.08 2.40 5958622.88 599807.58 70.29637362 -149.19179424 9 -SB" 3269.00 3.70 223.56 3073.78 3169.89 -640.82 659.42 648.62 -615.41 -204.89 2.37 5958621.91 599806.79 70.29637099 -149.19180080 3313.68 3.67 240.06 3118.37 3214.48 -642.93 662.27 651.00 -617.17 -207.12 2.37 5958620.12 599804.58 70.29636618 -149.19181889 3376.78 4.57 235.36 3181.31 3277.42 -645.96 666.80 654.53 -619.61 -210.94 1.52 5958617.64 599800.79 70.29635953 -149.19184980 3439.74 5.43 269.86 3244.04 3340.15 -648.21 672.13 657.53 -621.04 -215.99 4.88 5958616.14 599795.77 70.29635561 -149.19189064 3503.14 7.21 293.23 3307.06 3403.17 -647.77 679.01 658.27 -619.48 -222.64 4.88 5958617.61 599789.09 70.29635988 -149.19194454 3566.44 7.83 305.86 3369.82 3465.93 -644.91 687.26 656.89 -615.39 -229.79 2.78 5958621.61 599781.89 70.29637106 -149.19200239 3629.23 9.76 321.87 3431.88 3527.99 -639.43 696.80 653.04 -608.69 -236.54 4.94 5958628.21 599775.05 70.29638934 -149.19205708 3699.84 10.35 338.18 3501.42 3597.53 -629.98 709.05 645.42 -598.09 -242.60 4.10 5958638.73 599768.85 70.29641830 -149.19210610 3763.54 10.22 347.77 3564.10 3660.21 -619.84 720.40 636.67 -587.26 -245.92 2.69 5958649.51 599765.39 70.29644790 -149.19213302 3826.99 10.54 358.58 3626.52 3722.63 -608.91 731.80 626.79 -575.95 -247.26 3.11 5958660.80 599763.90 70.29647878 -149.19214384 3889.65 12.38 7.95 3687.93 3784.04 -596.57 744.22 615.11 -563.57 -246.47 4.17 5958673.19 599764.52 70.29651261 -149.19213747 3952.95 14.55 7.18 3749.49 3845.60 -581.84 758.96 600.96 -548.96 -244.54 3.44 5958687.83 599766.26 70.29655253 -149.19212183 4016.26 16.51 10.36 3810.48 3906.59 -564.90 775.91 584.62 -532.22 -241.93 3.37 5958704.60 599768.65 70.29659827 -149.19210069 4079.49 18.43 12.53 3870.80 3966.91 -545.93 794.89 566.14 -513.62 -238.14 3.21 5958723.24 599772.19 70.29664907 -149.19207005 4144.04 20.24 12.91 3931.70 4027.81 -524.59 816.26 545.27 -492.78 -233.43 2.81 5958744.15 599776.62 70.29670602 -149.19203193 4203.83 22.62 12.55 3987.35 4083.46 -502.79 838.10 523.98 -471.47 -228.62 3.99 5958765.51 599781.14 70.29676423 -149.19199299 4270.78 23.79 9.98 4048.89 4145.00 -476.42 864.48 498.50 •445.60 -223.48 2.31 5958791.45 599785.93 70.29683490 -149.19195140 4333.66 25.48 6.67 4106.05 4202.16 -450.23 890.68 473.71 -419.67 -219.72 3.47 5958817.42 599789.36 70.29690573 -149.19192088 4397.75 27.48 6.11 4163.41 4259.52 421.70 919.25 447.20 -391.27 -216.54 3.14 5958845.85 599792.15 70.29698331 -149.19189518 4460.97 29.98 8.24 4218.84 4314.95 -391.34 949.64 419.13 -361.13 -212.72 4.27 5958876.04 599795.57 70.29706566 -149.19186428 4523.54 31.96 8.30 4272.49 4368.60 -359.15 981.83 389.52 -329.27 -208.09 3.16 5958907.96 599799.78 70.29715270 -149.19182679 4588.04 33.95 6.74 4326.61 4422.72 -324.09 1016.92 357.97 -294.49 -203.51 3.35 5958942.79 599803.89 70.29724772 -149.19178972 4651.03 36.50 6.70 4378.06 4474.17 -287.81 1053.25 326.32 -258.41 -199.26 4.05 5958978.92 599807.66 70.29734629 -149.19175531 4714.13 37.85 5.11 4428.34 4524.45 -249.76 1091.37 294.58 -220.49 -195.35 2.63 5959016.89 599811.07 70.29744989 -149.19172363 4777.84 40.08 3.52 4477.88 4573.99 -209.87 1131.43 263.80 -180.54 -192.35 3.84 5959056.87 599813.54 70.29755902 -149.19169934 4841.28 42,64 2.47 4525.49 4621.60 -168.22 1173.35 235.36 -138.68 -190.17 4.18 5959098.75 599815.16 70.29767338 -149.19168169 4905.26 44.97 3.12 4571.66 4667.77 -124.24 1217.63 210.40 -94.45 -188.00 3.71 5959143.00 599816.74 70.29779422 -149.19166417 4968.79 46.98 1.89 4615.81 4711.92 -78.91 1263.31 192.31 -48.82 -186.01 3.46 5959188.65 599818.12 70.29791888 -149.19164809 5032.24 48.38 1.86 4658.53 4754.64 -32.41 1310.22 184.49 -1.93 -184.48 2.21 5959235.56 599819.03 70.29804698 -149.19163567 5095.61 49.90 1.37 4699,98 4796.09 15.06 1358.15 188.81 45.98 -183.13 2.47 5959283.47 599819.74 70.29817785 -149.19162476 5159.29 51.87 0.84 4740.16 4836.27 63.93 1407.55 205.64 95.37 -182.18 3.16 5959332.87 599820.03 70.29831280 -149.19161708 5222.61 53.87 1.30 4778.38 4874.49 113.86 1458.03 232.63 145.84 -181.24 3.21 5959383.35 599820.31 70.29845069 -149.19160943 5286.00 54.60 2.43 4815.43 4911.54 164.84 1509.47 266.74 197.25 -179.56 1.85 5959434.77 599821.30 70.29859113 -149.19159587 5348.99 55.66 3.12 4851.44 4947.55 216.16 1561.15 305.43 248.87 -177.06 1.91 5959486.41 599823.11 70.29873214 -149.19157560 5412.77 57.14 3.72 4886.73 4982.84 268.98 1614.27 348.39 301.90 -173.88 2.45 5959539.47 599825.58 70.29887701 -149.19154993 5476.17 57.78 4.61 4920.84 5016.95 322.20 1667.72 393.79 355.20 -170.00 1.56 5959592.82 599828.75 70.29902263 -149.19151850 5539.26 57.65. 5.45 4954.53 5050.64 375.37 1721.05 440.53 408.33 -165.33 1.14 5959646.00 599832.72 70.29916778 -149.19148064 5602.42 58.00 5.98 4988.17 5084.28 428.71 1774.51 488.47 461.53 -160.00 0.90 5959699.25 599837.34 70.29931310 _ -149.19143754 1 5665.92 56.71 5.37 5022.42 5118.53 482.06 1827.98 537.48 514.73 -154.71 2.19 5959752.52 599841.92 70.29945846 -149.19139472 -. 5728.71 54.51 6.39 5057.88 5153.99 533.76 1879.79 585.65 566.27 -149.41 3.75 5959804.12 599846.53 70.29959926 -149.19135179 5791.90 54.31 5.94 5094.66 5190.77 585.06 1931.18 633.91 617.36 -143.89 0.66 5959855.27 599851.37 70.29973883 -149.19130711 5855.46 55.07 6.09 5131.40 5227.51 636.83 1983.05 683.12 668.94 -138.46 1.21 5959906.92 599856.12 70.29987974 -149.19126310 5918.15 55.18 6.39 5167.24 5263.35 688.18 2034.48 732.22 720.07 -132.87 0.43 5959958.11 599861.03 70.30001942 -149.19121784 5981.31 54.69 6.48 5203.53 5299.64 739.80 2086.17 781.83 771.44 -127.07 0.78 5960009.55 599866.14 70.30015976 -149.19117093 6045.02 53.44 5.70 5240.92 5337.03 791.29 2137.76 831.67 822.73 -121.60 2.20 5960060.90 599870.93 70.30029988 -149.19112660 6108.28 53.78 5.86 5278.45 5374.56 842.11 2188.68 881.12 873.39 -116.47 0.57 5960111.63 599875.38 70.30043830 -149.19108507 6171.77 54.15 6.10 5315.80 5411.91 893.35 2240.02 931.11 924.46 -111.12 0.66 5960162.75 599880.05 70.30057780 -149.19104176 6235.48 54.25 6.13 5353.07 5449.18 944.93 2291.70 981.53 975.83 -105.62 0.16 5960214.19 599884.87 70.30071816 -149.19099719 6297.92 54.43 6.49 5389.47 5485.58 995.58 2342.43 1031.12 1026.26 -100.04 0.55 5960264.68 599889.77 70.30085591 -149.19095204 6392.43 54.74 6.77 5444.23 5540.34 1072.51 2419.45 1106.53 1102.77 -91.15 0.41 5960341.30 599897.65 70.30106493 -149.19088002 6487.56 55.41 6.09 5498.70 5594.81 1150.39 2497.45 1183.15 1180.27 -82.41 0.92 5960418.90 599905.35 70.30127667 -149.19080931 6582.52 55.96 6.11 5552.23 5648.34 1228.68 2575.88 1260.44 1258.26 -74.08 0.58 5960496.99 599912.64 70.30148973 -149.19074182 6676.60 54.18 6.17 5606.10 5702.21 1305.68 2653.01 1336.57 1334.95 -65.83 1.89 5960573.77 599919.87 70.30169923 -149.19067502 6771.70 51.69 5.89 5663.41 5759.52 1381.42 2728.89 1411.59 1410.41 -57.86 2.63 5960649.32 599926.84 70.30190538 -149.19061044 6866.91 49.48 7.58 5723.86 5819.97 1454.88 2802.44 1484.26 1483.45 -49.25 2.70 5960722.47 599934.47 70.30210492 -149.19054073 6961.62 47.59 9.20 5786.57 5882.68 1525.83 2873.40 1554.14 1553.65 -38.91 2.37 5960792.80 599943.88 70.30229672 -149.19045699 7056.39 44.42 10.06 5852.39 5948.50 1593.99 2941.57 1621.10 1620.86 -27.52 3.41 5960860.15 599954.37 70.30248033 -149.19036474 7151.36 40.25 11.54 5922.58 6018.69 1657.92 3005.51 1683.75 1683.68 -15.57 4.51 5960923.11 599965.48 70.30265193 -149.19026797 Drilling Office 2.6.1120.0 Prudhoe Bay Unit - WOA\Z-PAD1Z-6912-69\Z-69 10/9/2012 1:44 PM Page 2 of 3 Comments MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Easting Latitude Longitude _ (ft) 7245.49 1°I 38.93 11 12.21 (ft) 5995.12 Ift) 6091.23 Ift) 1717.86 (ft) 3065.50 (ftl 1742.38 Ift) 1742.38 (ft) 11100ft) 1.47 (ftUS) IftUSI I) 1 1 7278.32 38.20 12.35 6020.79 6116.90 1738.30 3085.97 1762.38 1762.38 -3.23 5960981.97 599977.04 70.30281231 -149.19016804 1.12 2.24 5961002.02 599981.12 70.30286694 -149.19013278 7334.68 37.32 14.02 6065.35 6161.46 1772.74 3120.48 1796.00 1795.98 8.99 2.39 5961035.72 599988.54 70.30295873 -149.19006907 7429.20 38.29 15.84 6140.03 6236.14 1830.41 3178.41 1852.11 1851.95 23.93 1.56 5961091.88 600002.73 70.30311165 -149.18994810 7524.05 38.21 14.73 6214.52 6310.63 1888.83 3237.13 1909.00 1908.59 39.41 0.73 5961148.72 600017.45 70.30326639 -149.18982272 7619.30 38.37 15.00 6289.28 6385.39 1947.60 3296.15 1966.40 1965.64 54.55 0.24 5961205.95 600031.83 70.30342223 -149.18970008 7714.31 38.00 14.32 6363.96 6460.07 2006.09 3354.89 2023.65 2022.46 69.41 0.59 5961262.96 600045.94 70.30357747 -149.18957967 7809.35 37.92 13.71 6438.89 6535.00 2064.37 3413.35 2080.86 2079.18 83.57 0.40 5961319.86 600059.34 70.30373242 -149.18946500 7904.52 37.33 17.04 6514.28 6610.39 2122.15 3471.44 2137.48 2135.19 98.96 2.22 5961376.06 600073.98 70.30388542 -149.18934035 7999.39 37.79 14.93 6589.48 6685.59 2179.61 3529.26 2193.79 2190.78 114.88 1.44 5961431.85 600089.16 70.30403729 -149.18921141 8094.13 37.61 15.07 6664.44 6760.55 2237.28 3587.20 2250.49 2246.74 129.87 0.21 5961488.01 600103.41 70.30419017 -149.18908995 8189.45 37.21 15.01 6740.16 6836.27 2294.92 3645.11 2307.22 2302.66 144.90 0.42 5961544.12 600117.69 70.30434295 -149.18896823 8283.72 36.42 15.09 6815.63 6911.74 2351.15 3701.60 2362.61 2357.22 159.57 0.84 5961598.86 600131.62 70.30449198 -149.18884941 8379.68 35.90 14.28 6893.10 6989.21 2407.54 3758.22 2418.25 2411.99 173.92 0.74 5961653.81 600145.25 70.30464161 -149.18873312 8474.81 39.35 15.08 6968.44 7064.55 2465.37 3816.28 2475.35 2468.15 188.65 3.66 5961710.16 600159.23 70.30479505 -149.18861380 8569.34 39.21 14.91 7041.61 7137.72 2524.94 3876.13 2534.20 2525.96 204.14 0.19 5961768.17 600173.94 70.30495298 -149.18848836 _ 8664.59 36.35 18.42 7116.89 7213.00 2582.82 3934.47 2591.28 2581.85 220.81 3.76 5961824.27 600189.87 70.30510568 _ -149.18835331 8758.74 35.35 18.46 7193.21 7289.32 2637.29 3989.61 2644.92 2634.16 238.25 1.05 5961876.80 600206.61 70.30524858 -149.18821202 8853.41 34.54 19.02 7270.81 7366.92 2690.82 4043.83 2697.66 2685.51 255.67 0.92 5961928.38 600223.34 70.30538886 -149.18807091 8948.90 34.41 19.19 7349.53 7445.64 2744.12 4097.88 2750.21 2736.59 273.36 0.17 5961979.68 600240.35 70.30552839 -149.18792760 9043.72 34.18 18.74 7427.86 7523.97 2796.82 4151.31 2802.24 2787.12 290.72 0.36 5962030.42 600257.04 70.30566642 -149.18778693 9139.36 34.04 18.74 7507.05 7603.16 2849.76 4204.94 2854.57 2837.91 307.96 0.15 5962081.43 600273.59 70.30580518 -149.18764734 9234.11 34.00 17.93 7585.58 7681.69 2902.14 4257.95 2906.41 2888.22 324.63 0.48 5962131.97 600289.59 70.30594264 -149.18751224 9329.00 33.48 17.74 7664.49 7760.60 2954.29 4310.66 2958.09 2938.40 340.77 0.56 5962182.34 600305.07 70.30607970 -149.18738146 9424.71 33.24 18.35 7744.43 7840.54 3006.34 4363.29 3009.69 2988.44 357.08 0.43 5962232.59 600320.70 70.30621641 -149.18724939 9519.44 33.54 17.16 7823.52 7919.63 3057.93 4415.42 3060.89 3038.09 372.97 0.76 5962282.44 600335.93 70.30635205 -149.18712061 9614.57 33.67 19.08 7902.76 7998.87 3109.99 4468.07 3112.57 3088.12 389.35 1.13 5962332.69 600351.64 70.30648873 -149.18698795 9708.50 35.36 20.68 7980.15 8076.26 3162.33 4521.29 3164.50 3138.16 407.46 2.04 5962382.96 600369.08 70.30662543 -149.18684121 9804.54 34.84 20.59 8058.73 8154.84 3216.52 4576.51 3218.28 3189.84 426.92 0.54 5962434.89 600387.85 70.30676662 -149.18668354 9899.20 34.14 20.12 8136.75 8232.86 3269.17 4630.11 3270.59 3240.09 445.56 0.79 5962485.38 600405.82 70.30690390 -149.18653246 9994.47 33.95 19.69 8215.69 8311.80 3321.63 4683.45 3322.76 3290.24 463.72 0.32 5962535.76 600423.31 70.30704091 -149.18638533 10089.24 35.57 19.19 8293.54 8389.65 3374.85 4737.48 3375.74 3341.19 481.70 1.74 5962586.95 600440.61 70.30718010 -149.18623967 10183.70 35.39 18.61 8370.46 8466.57 3428.94 4792.30 3429.63 3393.06 499.46 0.40 5962639.04 600457.67 70.30732180 -149.18609577 7" 10215.15 35.28 19.12 8396.12 8492.23 3446.89 4810.49 3447.51 3410.28 505.34 1.00 5962656.33 600463.33 70.30736882 -149.18604812 10280.00 36.33 19.31 8448.71 8544.82 3484.29 4848.43 3484.79 3446.10 517.83 1.63 5962692.31 600475.33 70.30746669 -149.18594695 10310.10 36.82 19.39 8472.89 8569.00 3501.96 4866.37 3502.41 3463.03 523.77 1.63 5962709.31 600481.05 70.30751292 -149.18589880 10332.58 36.03 19.93 8490.97 8587.08 3515.10 4879.72 3515.51 3475.59 528.26 3.79 5962721.94 600485.37 70.30754726 -149.18586242 10363.98 31,63 21.67 .8517.05 8613.16 3532.24 4897.19 3532.60 3491.94 534.45 14.35 5962738.36 600491.34 70.30759190 -149.18581226 10395.98 29.72 22.43 8544.57 8640.68 3548.18 4913.52 3548.49 3507.07 540.58 6.09 5962753.57 600497.27 70.30763324 -149.18576262 10427.08 29.51 22.62 8571.61 8667.72 3563.15 4928.89 3563.42 3521.26 546.47 0.74 5962767.84 600502.96 70.30767202 -149.18571492 10521.61 28.92 18.88 8654.12 8750.23 3608.38 4975.01 3608.55 3564.39 562.82 2.03 5962811.18 600518.74 70.30778982 -149.18558242 10616.58 29.00 18.43 8737.22 8833.33 3653.78 5021.00 3653.88 3607.95 577.53 0.24 5962854.93 600532.87 70.30790885 -149.18546324 _ 10711.05 27.55 16.09 8820.42 8916.53 3698.12 5065.74 3698.18 3650.67 590.82 1.93 5962897.82 600545.59 70.30802555 -149.18535550 10806.42 25.68 16.35 8905.68 9001.79 3740.55 5108.46 3740.58 3691.70 602.75 1.96 5962939.00 600556.97 70.30813762 -149.18525882 10901.39 25.21 15.52 8991.43 9087.54 3781.09 5149.27 3781.11 3730.93 613.96 0.62 5962978.37 600567.65 70.30824480 -149.18516802 TD 10964.69 24.66 12.36 9048.84 9144.95 3807.69 5175.95 3807.70 3756.82 620.39 2.28 5963004.34 600573.74 70.30831553 -149.18511588 11021.00 24.66 12.36 91 00.0 1 9196.12 3831.16 5199.44 3831.17 3779.77 625.42 0.00 5963027.36 600578.47 70.30837823 -149.18507512 Survey Error Model: ISCWSA Rev 0 "' 3-D 95.000% Confidence 2.7955 sigma Survey Program: Description MD From MD To EOU Freq Hole Size Casing Diameter Ift) (ft) (ft) (in) Survey Tool Type Borehole I Survey 0.000 40.010 Act Stns 12.250 (in) 9.625 UNDEFINED Z-69 / Z-69 40.010 677.000 Act Stns 12.250 9.625 GYD-GC-SS Z-69 / Z-69 677.000 3206.330 Act Stns 12.250 9.625 MWD+IFR+MS Z-691 Z-69 3206.330 3313.680 Act Stns 8.750 7.000 INC+TREND Z-69 / Z-69 3313.680 10215.150 Act Stns 8.750 7.000 MWD+IFR+MS Z -69/Z-69 10215.150 10964.690 Act Stns 6.125 4.500 MWD+IFR+MS Z-691 Z-69 10964.690 11021.000 Act Stns 6.125 4.500 BLIND Z -69I Z-69 Legal Description: Northing JY) Easting IX) Surface:4432.3 FSL 2671.8 FEL S19 T1 1N R12E UM 5959239.940 600003.450 BHL: 2932 FSL 2032 FEL 18 T1 1N R12EUM 5963027.360 600578.470 Drilling Office 2.6.1120.0 Prudhoe Bay Unit- WOAVZ-PAD\Z-69)Z-6912-69 10/9/2012 1:44 PM Page 3 of 3 i", ziZ�7�=C1 Regg, James B (DOA) From: Clemens, Christopher (PRA) [Christopher.Clemens@bp.com] / Sent: Thursday, October 04, 2012 6:38 AM To: DOA AOGCC Prudhoe Bay Cc: Schultz, Mikel; Willingham, James M; Mountford, Carl F; Kilfoyle, Jeffery A; Honas, Kristopher; Allen, Kenneth W; AK, D&C Rig 25 Well Site Leader; Daniel, Ryan; Ciolkosz, Ryan R Subject: Z-69 BOPE Usage Report Attachments: Z-69 BOPE usage.doc Attached is the BOPE usage form for Doyon Rig 25, Well number Z-69 for the event occurring 10/3/2012 at 09:00 hrs. Regards, Chris Clemens GPB Rotary Field Superintendent Cell: (907) 229-9382 Slope Office: (907) 659-4618 Harmony 6090 Blow Out Preventer Equipment ( BOPE Usage Report to the AOGCC The purpose of this document is to ensure timely reporting to the AOGCC of any BOPE use to prevent the flow of fluids from a well. Field Superintendent Name: Chris Clemens Wellsite Leader Name: Mike Dinger Contact Number: 907-229-9382 Contact Number: 659-5856 Traction Number: IR -4248377 Well Location & Name: Z-69 Permit To Drill PTD Number: 212076 API Number 50-029-23471-00-00 Date and Time of Incident: 10-3-12 9:00 AM Original Scope of Work: Drill grassroots well Z-69 , Operational Description Leading up to Well Control Event: While drilling ahead in the production interval Shublik formation at 10,423' MD, a flow increase was observed on the flow show indicator by the Driller. Pumps were shut off and the well was observed to be flowing. The well was shut in with the annular preventer. BOPE Used and Reason: Annular preventer per BP regulations. Well flowing at bell nipple with pumps off. Is a BOPE Test Required after use ( Yes / No): If no, why? Yes 24 hour notice required to NS AOGCC Inspectors prior to testing BOPE components. Plan Forward: The pressures were allowed to stabilize with recorded SIDPP 0 psi, and SICP 90 psi. The drillers method was used to circulate a surface to surface volume with the current MW of 8.8 ppg with resulting SIDP 0 psi, and SICP 0 psi at the end of circulation. The well was opened up and the well observed to be static. Additional Comments: Email to AOGCC North Slope Inspectors within 24 hours of the incident: doa.aogcc.prudhoe. bay(a)_alaska.gov Email CC List Well Integrity Team Leader Ran Daniel HSE Advisor Jeff Kilfo le En ineerin Team Leader Ken Allen, John E bejimba, John McMullen, Dave Reem Wells Operations Manager Steve Rossber Wells Intervention Manager Organizational Capability Doug Cismoski Tom Sheffre BOPE Usage Report for AOGCC August 2, 2010 HRE i T4, SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS c/ 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-69 BP Exploration (Alaska), Inc. Permit No: 212-076 Surface Location: 4433' FSL, 2672' FEL, SEC. 19, T11N, R12E, UM Bottomhole Location: 2918' FSL, 2026' FEL, SEC. 18, TI IN, R12E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. Foerster Chair DATED this g�day of June, 2012. cc: Department of Fish 8v Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALASF JIL AND GAS CONSERVATION COMM JN JUN 0 6 2012 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a. Type of work: ® Drill ❑ Redrill ❑ Re -Entry 1b. Proposed Well Class: ® Development Oil ❑ Service - Winj ® Single Zone ❑ Stratigraphic Test []Development Gas []Service - Supply ❑ Multiple Zone ❑ Exploratory ❑ Service - WAG ❑ Service - Disp 1 c. Specify if well is proposed for: ❑ Coalbed Gas ❑ Gas Hydrates ❑ Shale Gas 2. Operator Name: BP Exploration (Alaska) Inc. 5. Bond: ® Blanket ❑ Single Well Bond No. 6194193 11. Well Name and Number: PBU Z-69 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Proposed Depth: MD 11021' TVD 9197' 12. Field / Pool(s): Prudhoe Bay / Prudhoe Bay . 4a. Location of Well (Governmental Section): Surface: 4433' FSL, 2672' FEL, Sec. 19, T11 N, R12E, UM Top of Productive Horizon: 2698' FSL, 2103' FEL, Sec. 18, T11 N, R12E, UM Total Depth: 2918' FSL, 2026' FEL, Sec. 18, T11 N, R12E, UM 7. Property Designation (Lease Number): ADL 028262 " 8. Land Use Permit: 13. Approximate Spud Date: September 1, 2012 - 9. Acres in Property: 2560 14. Distance to Nearest Property: 8730' 4b. Location of Well (State Base Plan ori t sD 27): ( Surface: x- 600003 one ASP4 10. KB Elevation above MSL: 96.9' feet GL Elevation above MSL: 56.1 feet 15. Distance to Nearest Well Open to Same Pool: 1130' 16. Deviated Wells: Kickoff Depth: 600' ' feet Maximum Hole Angle: 57 degrees 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 3721 � Surface: 2877 18. Casing Program: Specifications I To - Settin De th - Bottom Quantity of Cement, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD(including stage data 20" 94# H-40 80' Surface Surface 80' 80' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC -M 3284' Surface Surface 3284' 3186' 1193 sx Dee Crete 406 sx Class 'G' 8-3/4" 7" 26# L-80 VamTop 10282' Surface Surface 10282' 8545' 566 ax LiteCrete 184 Sx I s'G' 6-1/8" 4-1/2" 12.6# 13Cr80 VamTo 889' 10132' 8421' 11021' 9197' 90 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor / Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: ® Property Plat ® BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ® Diverter Sketch ❑ Seabed Report ® Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. 1 hereby certify that the foregoing is true and correct. Contact Kris Honas, 564-4841 Printed Name Ken Allen Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-4366 Date / Joe Lastufka, 564-4091 f Commission Use Only Permit To Drill , / Number: ._��-76, API Number: //�� 7 (� 50- 11 L� I ��""� Permit A pro I D � rl/ See cover letter for other requirements Conditions of Approval: If box is checked, wwell may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: SOv j�5 C � )I e Y -f— Samples Re d: [3% ENo Other: 3 / )i P q' El Lel No Mud Log Req'd: ID h+i a"- 1 Gs f (P"'`",` HZS Measures: [ Yes ❑ No Directional Survey Req'd: ID Yes ❑ No _ P� 4L � z-� rGA1 � z 6 ( MISSION Date � �"� 4-���Q�& APPROVED BY THE COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 mon pfd al (20 AAC 25.005(g)) Su mit In Dup'cate To: Alaska Oil & Gas Conservation Commission From: Kristopher E. Honas, ODE Date: June 5, 2012 Re: Z-69 Permit to Drill The Z-69 well is currently scheduled to be drilled by Doyon 25 September 2012. The grassroots well is a slant producer targeting the Ivishak Zone 41hrough Zone 2 North of Z -pad. The well builds to the South through the surface hole prior to changing direction to avoid free gas on the North side of the Highland State Fault. This allows the well to remain a three string Ultra Slim Hole design. The production interval drills through the Sag River and Ivishak formations and will be a simple perforated chrome liner. Approximately 100 ft of perforations are anticipated. The maximum anticipated surface pressure from the Ivishak/Sag with a full column of gas from TD to surface is 2877 psi (assumes 8.48 ppg as max pore pressure). This well will be drilled by Doyon 25 using their 5000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3500 psi. . A detailed operations summary is included with the permit application. Below is a brief summary of planned drilling operations: 1. Move in Doyon 25 and function test diverter. 2. Drill 12-1/4" surface hole to 3284 ft MD. 3. Run 9-5/8" surface casing and cement to surface. 4. Nipple up BOPE and test. 5. Pressure test surface casing. Drill out the shoe and perform LOT. 6. Drill 8-3/4" intermediate hole to top of the reservoir at 10,282 ft MD. 7. Run 7" casing and cement to —500 ft TVD above the SB_Na top. 8. Drill out of intermediate shoe and perform FIT. 9. Drill 6-1/8" horizontal production hole through Zone 4 of the Ivishak to TD at 11,021 ft MD. 10. Obtain open hole sonic logs on wireline. 11. Run a cement bond- log and obtain shear/compressional sonic data over the 7" intermediate casing on wireline. 12. Make a cleanout run in the 6-1/8" production hole. 13. Run and fully cement a 4-1/2" chrome production liner. 14. Run drill pipe conveyed perforating guns. 15. Run 4-1/2" completion tubing. Sting into liner tieback sleeve and set production packer. 16. Pressure test the tubing and the inner annulus. 17. Rig down and move off the well. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on Z-69, please do not hesitate to use the contact information below. Kristopher Honas Office: 907-564-4841 Cell: 907-268-0891 Home: 907-929-4388 Email: Kristopher.Honas@bp.com Z-69 PTD Page 1 6/5/2012 Planned Well Summary Well Z-69 We1e Oil Producer, Fobjarget Ivishak ` Current Status Grass Roots Well - Conductor Currently Installed Estimated Start Date: 09/01/2012 Time to Complete: 35.8 Days Surface Northing Easting I Offsets TRS Location 5959240 600003 1 847' FNL / 2281' FWL 11 N 12E sec 19 Planned KOP: I . 600' MD/503' TVDss Planned TD: 11,021' MD/9100' TVDss Rig: Doyon 25 BF -RT: 56.1 ft _ RTE (ref MSI_): 96.9ft Directional — Schlumberger P14 KOP: 600' MD Northing Easting TVDss Offsets TRS Tgt 1 5962681 600473 -8440' 2587' FSL / 2143' FEL 11 N 12E sec 18 TSGR Production 5962792 600511 -8620' 2582' FNL / 2103' FEL 11 N 12E sec18 TSAD BHL 5963013 600585 -9100' 2362' FNL / 2025' FEL 11 N 12E sec 18 Planned KOP: I . 600' MD/503' TVDss Planned TD: 11,021' MD/9100' TVDss Rig: Doyon 25 BF -RT: 56.1 ft _ RTE (ref MSI_): 96.9ft Directional — Schlumberger P14 KOP: 600' MD Maximum Hole Angle: -56.5° in the 8-3/4" intermediate section -34.1° in the 6-1/8" production section Close Approach Wells: All off -set wells pass Major Risk Analysis Survey Program: Surface' to -500' MD = GYD-GC-SS (single shot gyro) -500' MD to TD = MWD+IFR+MS Nearest Property Line: 8730 ft Nearest Well within Pool: 1130 ft from Z-24 Z-69 PTD Page 2 6/5/2012 Formation Tops & Pore Pressure Estimate (SOR) Formation G1 SV6 EOCU SV5 BPRF SW SV3 SV2 SV1 9 5/8" Surf Cst UG4 UG4A Fault #1 (HSF) UG3 (Faulted) UGI UG Ma UG_Mb1 UG Mb2 UG Mc SB Na SB Nb SB OA SB_OBa SB_OBb SB OBc SB OBd SB_OBe SB_OBf SB OBf Base CM -2 CM -1 TLBK Fault #2 (Zpad F THRZ TKLB TKC4 LCU TKA5 TMLV Fault #3 TKNG TJG TJF TJE Fault #4 TJ D Estimated Formation Top (TVDss) 270.0 1,020.0 1,590.0 1,670.0 1,720.0 1,800.0 2,305.0 2,495.0 2,815.0 3,089.0 3,129.0 3,190.0 3,425.0 3,425.0 3,810.0 4,020.0 4,110.0 4,130.0 4.180.0 4,250.0 4,265.0 4,415.0 4,465.0 4,500.0 4,565.0 4,600.0 4,685.0 4,760.0 4,800.0 5,200.0 5,900.0 6,180.0 6,330.0 6,355.0 6,540.0 6,560.0 6,585.0 6,600.0 6,630.0 7,050.0 7,230.0 7,250.0 7,510.0 7,740.0 7,830.0 7,910.0 Depth Uncertainty TVD ft) +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +1- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 30 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft +l-50ft +/- 50 ft +/- 50 ft +/- 50 ft +/- 50 ft Fluid Type (for sands) No No No No No Hydrates below BPRF Hydrates Hydrates/Free gas Hydrates/Free gas No Poss Heavy oil Poss Heavy oil Poss Heavv oil No Poss Heavy oil Poss Heavy oil Poss Heavy oil Poss Heavy oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Viscous Oil Poss GOCM Poss GOCM Poss GOCM Poss GOCM Poss GOCM Poss GOCM Oil Oil Oil Poss GOCM Poss GOCM Poss GOCM Poss GOCM Poss GOCM Poss GOCM Most Likely Pore Pressure (EMW ppg) 8.40 8.40 8.40 8.40 8.60 8.60 8.60 8.60 8.60 8.70 8.70 8.80 8.80 8.80 8.70 8.80 8.80 8.80 8.80 8.70 8.70 8.45 8.45 8.45 8.45 8.45 8.70 8.70 8.70 8.70 9.50 10.00 10.00 10.00 10.00 6.70 9.95 9.95 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 Z-69 PTD Page 3 6/5/2012 TJC 8,135.0 +/- 50 ft Poss GOCM 10.00 TJB 8,335.0 +/- 50 ft Poss GOCM 10.00 TJA 8,400.0 +/- 50 ft Poss GOCM 10.00 TSGR 8,440.0 +/- 50 ft Gas 8.48 TSHA 8,500.0 +/- 50 ft Gas 8.45 TEIL 8,590.0 +/- 50 ft Gas 8.36 TSAD (46P) 8,620.0 +/- 50 ft Gas 8.34 45N 8,665.0 +/- 50 ft Gas 8.31 44N 8,700.0 +/- 50 ft Gas 8.29 43N 8,713.0 +/- 50 ft Gas 8.28 42N 8,725.0 +/- 50 ft Gas 8.27 PGOC 8,765.0 +/- 50 ft Gas 8.24 41 N 8,766.0 +/- 50 ft Gas/Oil 8.22 31 N 8,810.0 +/- 50 ft Oil 8.21 27N 8,882.0 +/- 50 ft Oil 8.21 26N 8,920.0 +/- 50 ft Oil 8.20 POWC 8,948.0 +/- 50 ft Water 8.22 25N 8,950.0 +/- 50 ft Water 8.22 24N 8,965.0 +/- 50 ft Water 8.22 23N 9,005.0 +/ 50 ft Water 8.22 22N 9,040.0 +/- 50 ft Water 8.22 TD 9,100.0 Water 8.22 Casinq/Tubing Program Hole Size Liner / Tbg O.D. WVFt Grade Conn Burst (psi) Collapse (psi) Length Top MD / TVDss Bottom MD / TVDss - 20" 94 H-40 - 1530 520 80' Surface 80724' 12-1/4" 9-5/8" 40# L-80 BTC -M 5750 3090 3284' Surface 328473089' 8-3/4" 7" 26# L-80 VamTop 7,240 5,410 10,282' Surface 10,282'/8448' 6-1/8" 4 %2" 12.6# 13Cr-80 VamTop 8,430 7,500 889' 10,13278324' 150' la 1102179100' Tubing 4'h" 12.6# 13Cr-80 VamTop 8,430 7,500 10,137' Surface 10,13778328' (-5' into liner TBS Mud Proaram Surface Hole Mud Pro erties: Drill lex 1 12-1/4" Hole Section hole section Depth Interval Density PV YP API FL Funnel Depth Interval Density LSYP YP API FL Chlorides PH Viscosity ppg 2x3-6 rpm Ib/100 ft2 ml/30min mg/I sec/qt 0' -Section TD' -8.8-9.4 30-50 40-80 NC <1000 10.8 60-120 Intermediate Mud Properties: LSND 1 8-3/4" hole section Depth Interval Density PV YP API FL HTHP FL MBT pH s 3284'-6617' MD To -500' MD Above 8.8 - 10.2 12 - 18 20-28 <6 NC <18 9-10 Overpressure 6617'-8610' MD To 200' MD above 10.2-10.4 12-18 20-28 <4 <10 <18 9-10 Kin ak 8610' - Section TD 10.4 12-22 1 20-28 <4 1 <10 <20 9-10 Z-69 PTD Page 4 6/5/2012 37Z 1 "? 5: V Production Mud Properties: Water Based Poll mer Fluid (FloPro Or PowerPro) 1 6-1/8" hole section Depth Interval Density PV YP API FL Low Shear Rate MBT pH Tail: Open hole volume + 40% excess + 80 ft shoe track (ppg) (cp) (Ib/100ft2) Lead Viscosity Volume: 10282' -TD 8.7 - 8.8 <12 10-20 >10 >15000 <4 8-9.5 Loaaina Proaram i- 12 1/4"Surface: Sample Catchers - not required for surface hole Drilling: Dir/GR/Res Oen Hole: None Cased Hole: None 8-%" Intermediate: Sample Catchers — as required by Geology Drilling: Dir/GR/Res/Neu/Den Oen Hole: None Cased Hole: USIT/CBL in cement evaluation mode from top 7" csg shoe to surface. Compressional/shear slowness and shear anisotropy using SonicScanner on wireline from 7" casing shoe to approximately 200 ft above top of cement 6-'/8" Production: Sample Catchers — as required by Geology Drilling: Dir/GR/Res/Neu/Den Oen Hole: Compressional/shear slowness and shear anisotropy using SonicScanner on wireline Cased Hole: None Cement Proaram Casing Size 9-5/8" 40#, L-80 Surface Casing Lead: Open hole volume + 250% excess through permafrost and 40% excess below permafrost. Basis: Port collar used if hole conditions dictate Lead TOC: Surface Tail: Open hole volume + 40% excess + 80 ft shoe track Total Cement Tail TOC: 1000 ft MD above casing shoe Total Cement Lead 395.3 bbls, 2219 cuft, 1193 sks of 11.0 ppg DeepCRETE, Yield: 1.86 ft3/sk Volume: - 38.1 bbls, 214 cuft, 184 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Tail 84.5 bbls, 474.4 cuft, 406 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sk Casing Size 7" 26#, L-80 Intermediate Casing Lead: Open hole volume + 30% excess Basis: Lead TOC: 500 ft TVD above the SB Na formation to Tail: Open hole volume + 30% excess + 80 ft shoe track Tail TOC: 1000 ft MD above casing shoe Total Cement Lead 185.6 bbls, 1042 cuft, 566 sks of 11.0 ppg LiteCRETE, Yield: 1.84 ft3/sk Volume: Tail 38.1 bbls, 214 cuft, 184 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Casing Size 4.5" 12.6#, 13Cr-80 Production Liner Lead: Open hole volume + 30% excess + 80 ft shoe track + 150 ft liner lap + 200 ft DPxCsg Basis: excess Lead TOC: Liner To Tail: None Total Cement Lead 24.7 bbls, 138.7 cuft, 90 sks of 15.8 ppg Class G Cement, Yield: 1.54 ft3/sk Volume: Tail I None Z-69 PTD Page 5 6/5/2012 Surface and Anti -Collision Issues Surface Shut-in Wells: There are no wells requiring shut-in due to sub -surface anti -collision or well house removal to move Doyon 25 over the Z-69 conductor slot. Hydrogen Sulfide Z -Pad is considered an H2S site. Recent H2S data from the pad is as follows: Faults Formation Fault Well Name H2S Level Date of Reading #1 Closest SHL Well H2S Level Z-113 No Data Yet Intersect #2 Closest SHL Well H2S Level Z-65 10 2/3/2012 #1 Closest BHL Well H2S Level Z-24 12 2/9/2011 #2 Closest BHL Well H2S Level Z -21A 18 1/5/2011 Max. Recorded H2S on Pad/Facility Z-67 200 3/28/2012 Faults Formation Fault MD TVD Est. Throw Throw Uncertainty Encountered Intersect Intersect Direction Fault #1 Highland State Fault 3,634.5 3,425.0 200' SW 100' MD - U nu Fault #2 Z -Pad Fault - HRZ 7,604.1 6,330.0 80' W 100' MD Fault #3 - Miluveach 8,476.1 7,050.0 60' SW 100' MD Fault #4 - Kingak 9,420.8 7,830.0 25' SW 100' MD Drilling Waste Disposal There is no annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul Class I waste to DS -04 and/or Pad 3 for disposal. Contact the GPB Environmental Advisors (659-5893) for guidance. Well Control The 12-1/4" surface hole will be drilled with a diverter., The 8-3/4" intermediate and 6-1/8" production hole will be drilled with well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOP test frequency for Z-69 will be 14 days with function test every 7 days. Except in the event of a significant operational issues that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Z-69 PTD Page 6 6/5/2012 Intermediate Interval Maximum anticipated BHP 3721 psi at theTSGR at 8440' TVDss 8.48 EMW Maximum surface pressure 2877, psi (.10 psi/ft gas gradient to surface) Kick tolerance 25 bbls with 12.7 ppg frac gradient Kick tolerance Assumes 9.95 ppg pore pressure in the Kuparuk + 0.5 ppg kick intensity Integrity Test — 6-1/8" hole and 10.2 ppg MW. ' Planned BOP test pressure Rams test to 3,500 psi/250 psi. Planned completion fluids Annular test to 3,500psi/250 psi 7" Casing 3500 psi surface pressure Integrity Test — 8-314" hole LOT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" casing string. Production Interval z-77-1 Maximum anticipated BHP psi @ TSGR at 8440' TVDss (8.48 ppg EMW) Maximum surface pressure 2877 psi (.10 psi/ft gas gradient to surface) Kick tolerance Infinite with >9.9 ppg frac gradient Assumes an 8.48 ppg max pore pressure in the Sag/lvishak + 0.5 ppg kick intensity and 8.6 ppg MW. Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3,500psi/250 psi Integrity Test — 6-1/8" hole FIT after drilling 20'-50' of new hole, target 12.5 ppg FIT 4-1/2" Liner Top Packer 3500 psi surface pressure Planned completion fluids 9.4 ppg Brine / 6.8 ppg Diesel Variance Request To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1000'). Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 5 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. v, / Over 50 surface holes have been drilled on Z -pad, including the recent Z-40 and Z-50 wells in 2012, providing a high level of confidence in the ability to drill surface hole on the pad without incident. • The planned 8.8 - 9.4 ppg fluid will provide over balance to formation fluid. C- � v 3 �%) U k- � 2-C, /{� 0 6 .il.1L Z-69 PTD Page 7 6/5/2012 Z-69 General Operational Summary Proposed Drilling Rig Operations: 1. MIRU Doyon 25. 2. NU diverter spool & riser. Function test the diverter. 3. PU 4" drill pipe as required to TD the surface interval and stand back in the derrick. 4. MU the 12-%" drilling assembly with DIR/GR/RES on bent housing motor. Spud and directionally drill surface hole to base of permafrost. Gyro survey until magnetic interference clears up. CBU until hole is clean, then short trip to surface. Change out bit and dial down motor bend as required. 5. RIH and continue drilling surface hole to section TD at 3284 ft MD in shale above UG4. CBU until hole is clean. POH on elevators (if necessary pump out of hole, RIH to bottom until able to POH on elevators). Lay down BHA. 6. Run and fully cement 9-%", 40#, L-80, BTC -M casingto surface, displacing cement with drilling fluid. Bump plug and hold pressure for 5 minutes. 4r," 7. Nipple down the diverter spool and nipple up / test casing and tubing head. Nipple up the BOPE j/V and test to 250 -psi low /p . j,gh_.Test 4nnular to 250 -psi low / 3500 -psi high. ,.��....- t*� G•fl• /v �vw��Shlt`.A 8. Pressure test the 9-%" casing to 250 psi low / 3500 psi high for 5 minutes low / 30 minutes high. V��� 9. MU the 83/" drilling BHA with PDC bit, bent housing motor and DI R/GR/RES/N EU/DEN/PWD and RIH to float collar picking up 4" drill pipe as required to TD the intermediate interval. 10. Drill shoe track and displace well to 8.8 ppg LSND drilling fluid. G� 11. Drill 20 ft of new formation below 9-%" shoe and perform LOT per SOP. Targe 3 minolunj 1 7 ppq EMW for 25 bbl kick tolerance. 12. Drill 8-3/" int rm .diat -int .rval to section TD in TSGR at 10,282' MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • 3284 ft MD - 6617 ft MD.- 8.8 ppg -9.4ppg • 6617ft MD - 8610 ft MD: 10.2 ppg - 10.4 ppg • 8610 ft MD - Section TD: 10.4 ppg 13. CBU until hole is clean (minimum 2x) and condition mud for 7" casing. 14. POH while rolling the pumps at 1/2 - 1 BPM to top of Kingak to minimize swab. Continue to POH on elevators and lay down BHA (if backreaming to get out of open hole is necessary, trip back to TD and POH on elevators final trip out). • Note: MAD pass slide intervals between UG Ma top to 20 ft TVD below Base OBf with ADN at drilling RPM, drilling flow rate and 300 ft/hr pulling speed. 15. Change upper rams to 7 and test 250 psi low / 3500 psi high. 16. Run 7", 26#, L-80, VAM TOP HC,casing. Cement the 7" casing to 500' TVD above the SB Na top. � OL) c.�- s - y ''f r- rckw 17. Pressure test the 7" casing to 250 psi low / 3500 psi high for 5 minutes low / 30 minutes high when the plug bumps. Z-69 PTD Page 8 6/5/2012 18. Immediately following the casing pressure test initiate injection down the OA by pumping 5 bbls of drilling fluid to ensure annulus remains open for freeze protection. Continue to pump 3 - 5 bbls of drilling fluid down the OA every hour until the lead cement reaches 500 psi compressive strength. 19. Install the 7" casing pack -off through the stack and test to 250 psi low / 5000 psi high for 5 minutes. 20. Qq pg upper 7" casina rams to_YBB 5 and test to 250 psi low / 3500 psi high. 21. Freeze -protect the 9-%" x 7" annulus, once the tail cement has reached 500 psi compressive strength. 22. MU the 6-%" drilling BHA with insert bit, bent housing motor, and DIR/GR/RES/NEU/DEN. Slick (non -stabilized) ADN should be run. RIH and begin drilling out shoe track. 23. Displace the well to 8.7 ppc_FloPro SF fluid prior to fully drilling out shoe track. 24. Drill 20 ft of new formation and perform an FIT to 12.5 ppg. �' 25. Drill 6-1/8" hole to planned TD at 11021 ft MD per directional plan. Ensure well path passes through the upper driller's polygon at 8620 ft TVDss and through the lower driller's polygon at 9100 ft TVDss to maximize fault standoff in the production hole. 26. Circulate bottoms up as required to clean the hole. Backream to the 7" casing shoe to ensure best possible hole conditions for wireline logs. Circulate bottoms up inside the shoe and pull out of hole on elevators. Lay down drilling BHA. 27. RU E -line and RIH with Sonic Scanner for shear/compression slowness and shear anisotropy logs. Log the production hole from TD to —50 ft inside the 7" casing shoe. 28. POH with E -line and pick-up USIT/SonicScanner/GPIT. RIH and log 7" intermediate casing from 7" shoe to surface for cement evaluation and to obtain shear/compression slowness and shear anisotropy logs. Once —200 ft above TOC, increase logging speed for cement evaluation only. Ensure a CBL log is obtained in addition to USIT data. 29. MU cleanout BHA with insert bit (consider running directional tools if previous trip indicated potential hole problems). RIH to TD. Circulation bottoms up until hole is clean and POH on elevators wiping any tight spots. Circulate bottoms inside the 7" shoe. POH and lay down BHA. 30. MU and run 4-'/2" 12.6# 13CR VAM TOP liner. X -G, 4, , 4- 31. Fully cement the 4-1/2" production liner w/ 15.8 ppg Class G cement. Displace cement with Hi -Vis FloPro pert pill followed by used FloPro drilling fluid. 32. Set liner hanger and liner top packer and displace well to clean —8.6 ppg brine above the liner top. 33. Pull out of hole with 4" drill pipe and lay down liner running tool. 34. Pressure test the 7" production casing, 4-1/2" production liner, and liner top packer to 250 psi low / 3500 psi high for 5 minutes / 30 minutes and record test. Ensure cement has reached 500 psi compressive strength prior to test. A_ovc r Mkt. d"f F/-- 35. MU drill pipe conveyed pert guns. RIH and perforate. Perforation intervals will be based on "as - drilled" LWD. POH and lay down drill pipe and perforation guns. Verify all shots fired. 36. RU and run a 4-W, 12.6#, 13CR, VAMTOP tubing with gas lift mandrels. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. Run in lock down screws. Z-69 PTD Page 9 6/5/2012 37. Reverse circulate 9.4 ppg brine surface to surface. Spot 9.4 ppg corrosion inhibited brine in the tubing x casing annulus. 38. rop the ball/rod and land on the RHC -M no -shear seat in the XN-nipple. Set packer and individually test the tubing and annulus to 3500 psi for 30 minutes. Record each test. 39. Shear the DCK valve in GLM. 40. Install TWC and test from above to 250 psi low / 3500 psi high for 5 minutes each and from below to 250 psi low / 3500 psi high for 5 minutes / 30 minutes. 41. Nipple down the BOPS. Nipple up the adaptor flange and tree and test to 250 psi low / 5,000 psi high for 5 minutes each with diesel. 42. RU DSM Lubricator and test. Pull TWC. 43. RU circulating lines. Freeze protect the well to 2,200' TVD and allow diesel to U-tube reaching equilibrium. 44. Install a BPV. 45. Secure the well. Rig down and Move Off. Post Rig 1. Pull BPV. 2. Pull ball and rod / RHC -M with slickline 3. Install gas lift valves as required. 4. Flowback per ASRC 5. Install flow lines and wellhouse. Z-69 PTD Page 10 6/5/2012 Z-69 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE 1. Well Control / Reservoir Pressures: A. Surface Hole: No overpressure is expected in the surface hole and hydrates have been a minimal concern in this area of the pad. It is critical that the wellpath build to the South and remain South of the hardline at 3015 ft TVDss. This will ensure "free -gas" is not encountered while drilling on diverter. B. Intermediate Hole: Expect up to 10.0 ppg overpressure in the Colville starting at 5900 ft TVDss. The. Mud weight must be increased to a minimum of 10.2 ppg prior to drilling the Colville overpressure. C. Production Hole: The highest anticipated pore pressure in the production hole will be encountered in the Sag River at 8.48 ppg. The interval will be drilled with a minimum of 8.7 ppg drilling fluid to provide adequate trip margin. II. Lost Circulation/Breathing A. Surface Hole: Lost circulation is considered a minimal risk if mud properties remain in specification. B. Intermediate Hole: Breathing and/or lost circulation is a possibility due to 4 fault crossings. Breathing is also common in the Colville. The wellbore has been designed with a maximum mud weight of 10.4 ppg for over balance and wellbore stability. 10.5 ppg has historically been considered low enough to help prevent losses and breathing, however, ECD must be carefully managed to further reduce the risk. The Kuparuk C sands are depleted to 6.7 ppg. Drilling with a 10.2-10.4ppg drilling fluid increases risk of lost circulation into these sands. C. Production Hole: No fault crossings are planned in this section however the production hole drills parallel between two fault plains which increases risk for lost circulation. When drilling to 8620 ft TVDss ensure the wellpath is within the upper driller's polygon. Additionally at 9100 ft TVDss ensure the wellpath is within the lower driller's polygon. This will ensure maximum offset from the faults. Be prepared for breathing in the Shublik if fractures exist in the area. This has been an occasional problem across Prudhoe, but is considered a low risk on Z -pad. Ill. Kick Tolerance A. With the planned mud weights, the kick tolerance for the intermediate section is 25 bbls with a 12.7 ppg leak -off, and the production section is infinite with a 9.9 ppa leak -off. If plaffI1JeZrt10TT T values are not achieved, do not drill ahead without risk assessment and proper authorization. All kick tolerances are calculated based on a 0.5 ppg kick intensity over likely pore pressure. IV. Integrity Testing Test Point Test Depth Test pe EMW (Ib! al) 9-%" Shoe 20' S0' from the 9-5/8" Shoe LOT 12.7 ppg minimum (25 bbls) 13.7 ppg target 50 bbls) T' shoe 20'-50' from the 7" shoe FIT 9.9 ppg minimum (infinite) 12.5 ppg target (infinite) V. Hydrogen Sulfide A. As Z -Pad is considered an H2S site, refer to the ADW "Hydrogen Sulfide" SOP for the appropriate operational guidelines. The max recorded H2S readings on the pad were 200 ppm in Z-67 March 2012. Z-65 (closest well at surface) recorded 10 ppm in February 2012. Z-69 PTD Page 11 6/5/2012 VI. Faults Formation Fault Encountered IVID Intersect TVD Intersect Est. Throw Throw Direction Uncertainty Fault #1 - Highland State Fault - Ugnu 3,634.5 3,425.0 200' SW 100' MD Fault #2 - Z -Pad Fault - HRZ 7,604.1 6,330.0 80' W 100' MD Fault #3 - Miluveach 8,476.1 7,050.0 60' SW 100' MD Fault #4 - Kingak 9,420.8 7,830.0 25' SW 100' MD VII. Anti -Collision Issues A. There are no anti -collision issues with existing wellbores. Z-61 directional plan #5 fails major risk with the planned Z-69 wellpath, however, Z-61 is early in the planning stages and the planned wellpath is likely to change. If anti -collision issues are not resolved, a tolerable collision risk spread sheet will be completed for both wells. CONSULT THE Z -PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. Z-69 PTD Page 12 6/5/2012 TREE= 4-1/16" WELLHEAD= FMG ACTUATOR = Electric KB. ELEV = 96.9 BF- ELEV = KOP = 56.1 600 Max Angle = 57 deg Datum MD = 10695' MD Datum TVDss = 8800' TVDss Z-69 Proposed SA Y NOTES: ***CHROME Ma** 20" CONDUCTOR108' 19-5/8", 40f#, L-80, BTC -M. ID = 8.835" 1 GAS LIFT MA NDRELS 3284' ST MD TVD DEV TYPE I VLV LATCH PORT DATE 8 TBD 3000 TBD KBG-2 DUM BK 1" 7 TBD 4500 TBD KBG-2 DCK2 BEK 1" 6 TBD 5500 TBD KBG-2 DUM BK 1" 5 TBD 6000 TBD KBG-2 DUM BK V. 4 TBD 6500 TBD KBG-2 DUM BK 1" 3 TBD 7100 TBD KBG-2 DUM BK 1" 2 TBD 7700 TBD KBG-2 DUM BK 1" 1 TBD 8300 TBD KBG3 DUM BK 1" 14-1/2" TBG 12.6# 13CR-85 VT.0152 bpf ID=3.958" 1--1 10138' 117" CSG, 26#, L-80, VT HC, -0383 bpf, tD = 6276" 1-1 10282' PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2.88" 6 TBD Open TBD a 4-1/2" Solid LNR, 12.6#, 13Cr-85 VT, ID=3.958 11021' 14-1/2" HES X NIP, ID = 3.813" 3951' TOC 500 ft TVD above the Schrader Bluff Na top Minimum ID = 3.813" 4-1/2" XN Nipple @ 10126' MD a Prudhoe Bay UNIT WELL: Z-69 PERMIT No: API No: SECXXTWPXXN RGEXXE FSL XXXX' FB. XXXX' BP Exploration (Alaska) 9982' —j4-1/7' HES X NIP, ID = 3-813" 9 10113' ]7-X4-lt2"HESTNTPKR ID = 3.870" 10049' 4-1/2" HES X NIP, ID = 3.813" 10126' 4-1/2" HES XN NIP, ID = 3.725" 10132' 7"X5" BKR ZXP PKR & Flexlock HGR w MEBA CK SLV, ID = 4.4" 10138' WLEG Prudhoe Bay UNIT WELL: Z-69 PERMIT No: API No: SECXXTWPXXN RGEXXE FSL XXXX' FB. XXXX' BP Exploration (Alaska) Z-69 (P14) Proposal Report (Def Plan) Report Date: May 01, 2012 -10:34 AM Survey / DLS Computation: Minimum Curvature / Lubinski Client: Field: BP Exploration Alaska Prudhoe Bay Unit - WOA Vertical Section Azimuth: (fin f1 0 % Vertical Section Origin: 9.519 *(True North) , 0.000 it, 0.000 It Structure / Slot: Well: Z -PAD / Z�9 (NJ) �(h0��1 C % Plan Z-69 (NJ) v6 ea (� �J lSI J �/ TVD Reference Datum: TVD Reference Elevation: Rotary Table 96.900 ft above MSL ' Borehole: Plan Z-69 Seabed / Ground Elevation: 56.100 ft above MSL UWI / API#: Borehole -2986481 / 50029xxxxx70 Magnetic Declination: 20.416 ° Survey Name: Z-69 (P14) Total Field Strength: 57636.139 nT Survey Date: June 18, 2010 Magnetic Dip Angle: 80.996 ° Tort / AHD / DDI / ERD Ratio: 130.532 °/ 5156.103 ft 15.907 / 0.561 Declination Date: December 31, 2012 Coordinate Reference System: NAD27 Alaska Slate Plane, Zone 04, US Feet Magnetic Declination Model: BGGM 2011 Location Lat / Long: N 70° 17'52.98812", W 149"! 1' 24.51079" North Reference: True North Location Grid N/E Y/X: N 5959239.940 ftUS, E 600003.450 ftUS Grid Convergence Used: 0.000 ° CRS Grid Convergence Angle: 0.76245406 ° Total Corr Mag North ->True 20.416 ° 0.00 0.00 North: 198.44M schlumberger Comments MD Incl Azim True TVDSS TVD VSEC NS EW TF DLS Directional Northing Easting (ft) (9 0 (ft) (ft) (ft) (ft) (ft) (9 (7100ft) Difficulty Index (ftuS) (ftuS) RTE 0.00 0.00 198.44 -96.90 0.00 0.00 0.00 0.00 198.44M N/A 0.00 5959239.94 600003.45 G1 366.90 0.00 198.44 270.00 366.90 0.00 0.00 0.00 198.44M 0.00 0.00 5959239.94 600003.45 KOP Cry 1/100 600.00. 0.00 198.44 503.10 600.00 0.00 0.00 0.00 198.44M 0.00. 0.00 5959239.94 600003.45 700.00 1.00 198.44 603.09 699.99 -0.86 -0.83 -0.28 198.44M 1.00 0.00 5959239.11 600003.19 Cry 2/100 800.00 2.00 198.44 .703.06 799.96 -3.45 -3.31 -1.10 198.44M 1.00 0.84 5959236.61 600002.39 900.00 4.00 198.44 802.92 899.82 -8.62 -8.28 -2.76 198.44M 2.00 1.54 5959231.63 600000.80 1000.00 6.00 198.44 902.53 999.43 -17.23 -16.54 -5.51 HS 2.00 2.02 5959223.33 599998.16 Cry 3/100 1100.00 8.00 198.44 1001.78 1098.68 -29.27 -28.10 -9.37 0.3311 2.00 2.38 5959211.72 599994.46 SV6 1118.41 8.55 198.46 1020.00 1116.90 -31.89 -30.62 -10.21 0.31R 3.00 2.44 5959209.19 599993.65 1200.00 11.00 198.52 1100.40 1197.30 -45.57 -43.76 -14.60 0.24R 3,00 2.71 5959196.00 599989.43 1300.00 14.00 198.58 1198.02 1294.92 -66.94 -64.27 -21.49 0.1911 3.00 2.98 5959175.39 599982.62 1400.00 17.00 198.61 1294.37 1391.27 -93.33 -89.60 -30.01 0.16R 3.00 3.21 5959149.96 599974.64 End Cry 1492.04 19.76 198.63 1381.70 1478.60 -121.98 -117.10 -39.27 HS 3.00 3.39 5959122.34 599965.74 EOCU 1713.37 19.76 198.63 1590.00 1686.90 -195.87 -188.01 -63.18 HS 0.00 3.60 5959051.13 599942.78 SV5 1798.37 19.76 198.63 1670.00 1766.90 -224.25 -215.24 -72.37 HS 0.00 3.66 5959023.77 599933.96 BPRF 1851.50 19.76 198.63 1720.00 1816.90 -241.98 -232.26 -78.10 HS 0.00 3.69 5959006.68 599928.45 SV4 1936.51 19.76 198.63 1800.00 1896.90 -270.36 -259.50 -87.29 HS 0.00 3.74 5956979.33 599919.63 SV3 2473.11 19.76 198.63 2305.00 2401.90 -449.49 -431.41 -145.25 HS 0.00 3.97 5958806.67 599863.97 SV2 2675.00 19.76 198.63 2495.00 2591.90 -516.89 -496.09 -167.06 HS 0.00 4.03 5958741.71 599843.02 Cry 3/100 2711.93 19.76 198.63 2529.76 2626.66 -529.22 -507.92 -171.05 179.95L 0.00 4.04 5958729.83 599839.19 2800.00 17.12 198.63 2613.30 2710.20 -556.72 -534.32 -179.95 179.95L 3.00 4.12 5958703.32 599830.65 2900.00 14.12 198.61 2709.59 2806.49 -583.30 -559.83 -188.54 179.94L 3.00 4.19 5958677.70 599822.39 3000.00 11.12 198.60 2807.17 2904.07 -604.87 -580.53 -195.51 179.92L 3.00 4.25 5958656.91 599815.70 SVi 3007.98 10.88 198.60 2815.00 2911.90 -606.38 -581.98 -196.00 179.92L 3.00 4.26 5958655.46 599815.23 3100.00 8.12 198.57 2905.75 3002.65 -021.37 -596.37 -200.84 198.5M 3.00 4.31 5958641.00 599810.59 3200.00 5.12 198.50 3005.07 3101.97 -632.75 -607.30 -204.50 179.83L 3.00 4.36 5958630.03 599807.07 End Cry 3203.97 5.00 198.50 3009.02 3105.92 -633.10 -607.63 -204.61 HS 3.00 4.36 5958629.70 599806.96 Z-69 Tgt H. Flt 3209.97 5.00 198.50 3015.00 3111.90 -633.62 -608.12 -204.78 HS 0.00 4.36 5958629.20 599806.80 9-5/8" 3284.25 5.00 198.50 3089.00 3185.90 -640.01 -614.26 -206.83 HS 0.00 4.36 5958623.03 599804.83 Cry 3/100 3304.97 5.00 198.50 3109.64 3206.54 -641.79 -615.98 -207.41 166.7611 0.00 4.36 5958621.31 599804.28 UG4 3324.39 4.43 200.23 3129.00 3225.90 -643.37 -617.48 -207.93 210.31M 3.00 4.37 5958619.80 599803.77 UG4A 3385.51 2.70 210.31 3190.00 3286.90 -647.04 -620.95 -209.48 214.86M 3.00 4.40 5958616.32 599802.27 3400.00 2.32 214.86 3204.47 3301.37 -647.62 -621.48 -209.82 315.99M 3.00 4.40 5958615.78 599801.94 3500.00 1.51 315.99 3304.44 3401.34 -648.67 -622.20 -211.89 349.31 M 3.00 4.44 5958615.04 599799.88 Drilling Office 2.5.1100.0 Prudhoe Bay Unit - WOA\Z-PAD\Plan Z-69 (NJ) v6\Plan Z-692-69 (P14) 5/1/2012 1:59 PM Page 1 of 3 Comments MD Incl Azim True TVDSS TVD VSEC NS EW TF DLS Directional Northing Easting (tt) 0 (1 (ft) (ft) (ft) (ft) (ft) (y (7100ft) Difficulty Index (ftuS) (ftuS) 3600.00 4.14 349.31 3404.31 3501.21 -644.50 -617.70 -213.47 351.39M 3.00 4.47 5958619.51 599798.23 Fault #1 (HSF) 3620.75 4.75 351.39 3425.00 3521.90 -642.98 -616.11 -213.74 351.39M 3.00 4.48 5958621.09 599797.94 UG3 (Faulted) 3620.76 4.75 351.39 3425.01 3521.91 -642.98 -616.11 -213.74 356.05M 3.00 4.48 5958621.10 599797.94 3700.00 7.08 356.05 3503.82 3600.72 -635.11 -608.00 -214.57 9.33R 3.00 4.51 5958629.19 599797.01 3800.00 10.05 358.84 3602.70 3699.60 -620.55 -593.13 -215.17 6.57R 3.00 4.54 5958644.05 599796.21 3900.00 13.03 0.36 3700.67 3797.57 -600.84 -573.13 -215.28 5.08R 3.00 4.58 5958664.05 599795.84 4000.00 16.02 1.32 3797.46 3894.36 -576.04 -548.05 -214.89 4.1511 3.00 4.62 5958689.13 599795.89 UG1 4013.06 16.41 1.42 3810.00 3906.90 -572.43 -544.40 -214.80 4.05R 3.00 4.63 5958692.78 599795.93 4100.00 19.02 1.99 3892.81 3989.71 -546.22 -517.96 -214.01 3.51 R 3.00 4.66 5958719.22 599796.37 4200.00 22.01 2.48 3986.46 4083.36 -511.46 -482.95 -212.63 3.0511 3.00 4.70 5958754.25 599797.28 UG-Ma 4236.32 23.10 2.62 4020.00 4116.90 -497.64 -469.03 -212.01 2.92R 3.00 4.72 5958768.17 599797.72 4300.00 25.01 2.85 4078.14 4175.04 -471.86 443.11 -210.77 2.71 R 3.00 4.74 5958794.11 599798.61 UG_Mb1 4335.30 26.07 2.97 4110.00 4206.90 -456.75 -427.91 -210.00 2.6R 3.00 4.76 5958809.31 599799.19 UG_Mb2 4357.63 26.73 3.04 4130.00 4226.90 -446.88 -417.99 -209.48 2.54R 3.00 4.77 5958819.23 599799.57 4400.00 28.00 3.16 4167.62 4264.52 427.53 -398.55 -208.42 2.4411 3.00 4.79 5958838.69 599800.37 UG-Mc 4414.05 28.43 3.19 4180.00 4276.90 -420.93 -391.92 -208.06 2AR 3.00 4.79 5958845.33 599800.65 SB-Na 4494.58 30.84 3.39 4250.00 4346.90 -381.34 -352.16 -205.77 2.23R 3.00 4.83 5958885.10 599802.41 4500.00 31.00 3.40 4254.65 4351.55 -378.58 -349.38 -205.60 2.22R 3.00 4.83 5958887.88 599802.53 SB-Nb 4512.10 31.37 3.43 4265.00 4361.90 -372.34 -343.13 -205.23 2.2R 3.00 4.84 5958894.14 599802.82 4600.00 34.00 3.61 4338.97 4435.87 -325.15 -295.76 -202.31 2.0511 3.00 4.88 5958941.54 599805.11 4700.00 37.00 3.79 4420.38 4517.28 -267.38 -237.82 -198.56 1.911 3.00 4.92 5958999.52 599808.09 SB OA 4712.08 37.36 3.81 4430.00 4526.90 -260.12 -230.54 -198.08 1.89R 3.00 4.92 5959006.81 599808.48 SB_OBa 4756.51 38.69 3.88 4465.00 4561.90 -232.88 -203.23 -196.24 1.83R 3.00 4.94 5959034.14 599809.95 4800.00 40.00 3.94 4498.63 4595.53 -205.44 -175.72 -194.36 1.78R 3.00 4.96 5959061.67 599811.46 4900.00 43.00 4.08 4573.52 4670.42 -139.50 -109.63 -189.72 1.6811 3.00 5.01 5959127.80 599815.22 SB_OBb 4908.88 43.26 4.09 4580.00 4676.90 -133.46 -103.58 -189.29 1.67R 3.00 5.01 5959133.86 599815.57 SB_0Bc 4936.53 44.09 4.13 4600.00 4696.90 -114.45 -84.53 -187.92 1.64R 3.00 5.02 5959152.92 599816.68 5000.00 45.99 4.20 4644.85 4741.75 -69.73 -39.74 -184.66 1.59R 3.00 5.05 5959197.75 599819.35 SB_OBd 5043.93 47.31 4.25 4675.00 4771.90 -37.92 -7.88 -182.31 1.56R 3.00 5.07 5959229.64 599821.28 5100.00 48.99 4.31 4712.41 4809.31 3.67 33.77 -179.19 1.52R 3.00 5.09 5959271.32 599823.84 SB_0Be 5127.04 49.80 4.34 4730.00 4826.90 24.11 54.24 -177.64 1.5R 3.00 5.10 5959291.81 599825.12 SB_OBf 5190.26 51.70 4.40 4770.00 4866.90 72.88 103.06 -173.91 1.46R 3.00 5.13 5959340.67 599828.20 5200.00 51.99 4.41 4776.02 4872.92 80.50 110.69 -173.32 1.4511 3.00 5.13 5959348.31 599828.69 SB_0Bf Base 5256.26 53.68 4.47 4810.00 4906.90 125.16 155.39 -169.85 1.42R 3.00 5.16 5959393.04 599831.57 5300.00 54.99 4.51 4835.50 4932.40 160.56 190.82 -167.07 1 AR 3.00 5.17 5959428.50 599833.87 End Cry 5350.30 56.50 4.55 4863.82 4960.72 201.98 232.26 -163.79 HS 3.00 5.20 5959469.98 599836.60 CM-2 5977.52 56.50 4.55 5210.00 5306.90 723.04 753.64 -122.29 HS _ 0.00 5.34 5959991.82 599871.15 Cry 3/100 6550.30 56.50 4.55 5526.14 5623.04 1198.88 1229.77 -84.40 160.77R 0.00 5.45 5960468.37 599902.70 6600.00 55.09 5.15 5554,Q8 5650.98 1239.84 1270.73 -80.93 160.43R 3.00 5.46 5960509.36 599905.63 6700.00 52.27 6.42 5613.30 5710.20 1320.24 1350.88 -72.83 159.6813 3.00 5.49 5960589.61 599912.66 6800.00 49.47 7.79 5676.40 5773.30 1397.73 1427.85 -63.26 158.82R 3.00 5.52 5960666.69 599921.21 6900.00 46.68 9.28 5743.21 5840.11 1472.11 1501.42 -52.24 157.8211 3.00 5.54 5960740.40 599931.24 7000.00 43.91 10.91 5813.55 5910.45 1543.17 1571.39 -39.81 156.67R 3.00 5.57 5960810.52 599942.74 7100.00 41.17 12.71 5887.22 5984.12 1610.72 1637.56 -26.00 155.34R 3.00 5.59 5960876.86 599955.67 CM-1 7116.91 40.71 13.04 5900.00 5996.90 1621.78 1648.37 -23.53 155.1R 3.00 5.60 5960887.70 599957.99 End Cry 7199.50 38.48 14.71 5963.64 6060.54 1674.26 1699.46 -10.92 HS 3.00 5.61 5960938.95 599969.92 TLBK 7475.87 38.48 14.71 6180.00 6276.90 1845.50 1865.78 32.76 HS 0.00 5.64 5961105.82 600011.37 Fault #2 (Zpad Flt) 7667.47 38.48 14.71 6330.00 6426.90 1964.23 1981.08 63.04 HS 0.00 5.65 5961221.50 600040.12 THRZ 7699.41 38.48 14.71 6355.00 6451.90 1984.01 2000.30 68.08 HS 0.00 5.66 5961240.79 600044.91 TKLB 7935.72 38.48 14.71 6540.00 6636.90 2130.44 2142.50 105.43 HS 0.00 5.68 5961383.46 600080.35 TKC4 7961.26 38.48 14.71 6560.00 6656.90 2146.27 2157.88 109.47 HS 0.00 5.68 5961398.89 600084.19 LCU 7993.20 38.48 14.71 6585.00 6681.90 2166.05 2177.09 114.52 HS 0.00 5.68 5961418.17 600088.98 TKA5 8012.36 38.48 14.71 6600.00 6696.90 2177.93 2188.62 117.54 HS 0.00 5.68 5961429.74 600091.85 TMLV 8050.68 38.48 14.71 6630.00 6726.90 2201.67 2211.68 123.60 HS 0.00 5.69 5961452.87 600097.60 Fault #3 8587.17 38.48 14.71 7050.00 7146.90 2534.09 2534.53 208.39 HS 0.00 5.73 5961776.79 600178.08 Cry 3/100 .8621.25 38.48 14.71 7076.68 7173.58 2555.21 2555.04 213.77 150.9311 0.00 5.73 5961797.37 600183.19 Drilling Office 2.5.1100.0 Prudhoe Bay Unit - WOA\Z-PAD\Plan Z-69 (NJ) v6\Plan Z-69\Z-69 (P14) 5/1/2012 1:59 PM Page 2 of 3 Comments End Cry TKNG TJG TJF TJE Fault #4 TJD TJC TJB TJA - TSGR 7" Cry 41100 End Cry TSHA TEIL TSAD (46P) 45N 44N 43N 42N PGOC 41N End Cry 31N 27P 26N POWC 25N 24N 23N 22N TD Survey Type: Legal Description: MD (ft) Incl 0 Azim True 0 TVDSS (ft) TVD (ft) VSEC (ft) NS (ft) EW (ft) TF 0 DLS (7100ft) Directional Difficulty Index Northing (ftuS) Easting (ftu5) 8700.00 36.43 16.65 7139.20 7236.10 2602.82 2601.14 226.70 149AR 3.00 5.74 5961843.63 600195.50 8791.82 34.08 19.15 7214.18 7311.08 2655.24 2651.57 242.95 HS 3.00 5.76 5961894.27 600211.07 8810.92 34.08 19.15 7230.00 7326.90 2665.79 2661.68 246.46 HS 0.00 5.76 5961904.43 600214.45 8835.07 34.08 19.15 7250.00 7346.90 2679.13 2674.47 250.90 HS 0.00 5.76 5961917.27 600218.72 9148.98 34.08 19.15 7510.00 7606.90 2852.55 2840.63 308.60 HS 0.00 5.78 5962084.17 600274.20 9426.67 34.08 19.15 7740.00 7836.90 3005.97 2987.63 359.65 HS 0.00 5.80 5962231.82 600323.28 9535.33 34.08 19.15 7830.00 7926.90 3056.00 3045.15 379.62 HS 0.00 5.80 5962289.59 600342.48 9631.92 34.08 19.15 7910.00 8006.90 3119.36 3096.27 397.37 HS 0.00 5.81 5962340.95 600359.56 9903.58 34.08 19.15 8135.00 8231.90 3269.43 3240.07 447.31 HS 0.00 5.82 5962485.38 600407.57 10145.05 34.08 19.15 8335.00 8431.90 340283 3367.89 491.70 HS 0.00 5.84 5962613.77 600450.25 10223.53 34.08 19.15 8400.00 8496.90 3446.19 3409.44 506.12 HS 0.00 5.84 5962655.50 600464.12 -10271.82- 34.08 19.15 8440.00 8536.90 3472.87 3435.00 515.00 HS 0.00 5.84 5962681.18 600472.65 10281.82 34.08 19.15 8448.28 8545.18 3478.40 3440.29 516.84 HS 0.00 5.84 5962686.49 600474.42 10301.82 34.08 19.15 - 8464.85 8561.75 3489.44 3450.88 520.51 156.5811 0.00 5.84 5962697.13 600477.95 10338.70 32.73 20.23 8495.64 8592.54 3509.43 3470.00 527.35 HS 4.00 5.85 5962716.33 600484.54 10343.89 32.73 20.23 8500.00 8596.90 3512.19 3472.63 528.32 HS 0.00 5.85 5962718.98 600485.47 10450.88 32.73 20.23 8590.00 8686.90 3569.02 3526.91 548.33 HS 0.00 5.86 5962773.51 600504.75 10486.54 32.73 20.23 8620.00 8716.90 3587.97 3545.00 555.00 175.96L 0.00 5.86 5962791.69 600511.18 10500.00 32.19 20.16 8631.36 8728.26 3595.07 3551.78 557.49 175.91 4.00 5.86 5962798.50 600513.59 10539.42 30.62 19.94 8665.00 8761.90 3615.27 3571.08 564.54 175.71L 4.00 5.87 5962817.89 600520.37 10579.76 29.01 19.69 8700.00 8796.90 3635.00 3589.95 571.34 175.5L 4.00 5.88 5962836.85 600526.92 10594.59 26.42 19.60 8713.00 8809.90 3642.01 3596.65 573.73 175.41L 4.00 5.88 5962843.58 600529.23 10600.00 28.21 19.56 8717.77 8814.67 3644.54 3599.07 574.60 175.38L 4.00 5.88 5962846.01 600530.05 10608.20 27.88 19.50 8725.00 8821.90 3648.33 3602.70 575.88 175.33L 4.00 5.88 5962849.66 600531.29 10653.08 26.09 19.17 8765.00 8861.90 3668.40 3621.92 582.63 175.03L 4.00 5.89 5962868.97 600537.78 10654.20 26.05 19.16 8766.00 8862.90 3668.89 3622.38 582.79 175.02L 4.00 5.89 5962869.43 600537.94 10700.00 24.22 18.77 6807.47 8904.37 3688.07 3640.78 589.11 174.671- 4.00 5.90 5962887.91 600544.02 10701.07 24.18 18.76 8808.44 8905.34 3688.51 3641.19 589.26 HS 4.00 5.90 5962888.32 600544.15 10702.78 24.18 18.76 8810.00 8906.90 3689.20 3641.86 589.48 HS 0.00 5.90 5962888.99 600544.37 10781.70 24.18 18.76 8882.00 8978.90 3721.10 3672.46 599.88 HS 0.00 5.90 5962919.73 600554.36 10823.36 24.18 18.76 8920.00 9016.90 3737.94 3688.62 605.37 HS 0.00 5.90 5962935.95 600559.63 10854.05 24.18 18.76 8948.00 9044.90 3750.35 3700.52 609.41 HS 0.00 5.90 5962947.91 600563.51 10856.24 24.18 18.76 8950.00 9046.90 3751.23 3701.37 609.70 HS 0.00 5.90 5962948.76 600563.79 10872.68 24.18 18.76 8965.00 9061.90 3757.88 3707.75 611.86 HS 0.00 5.90 5962955.16 600565.87 10916.53 24.18 18.76 9005.00 9101.90 3775.61 3724.75 617.64 HS 0.00 5.90 5962972.24 600571.42 10954.89 24.18 18.76 9040.00 9136.90 3791.11 3739.63 622.70 HS 0.00 5.90 5962987.18 600576.28 11020.66 24.18 18.76 9100.00 9196.90 3817.70 3765.13 631.36 0.00 5.91 5963012.80 600584.60 Def Plan Surface: 4432.3 FSL 2671.8 FEL S19 T11 N R12E UM z-69 tgt h. fit: 3824 FSL 2879 FEL 19 T11 N R12EUM td / BHL: 2917 FSL 2026 FEL 18 T11N R12EUM Northing tY1 Easting 1X1 5959239.940 600003.450 5958629.200 599806.800 5963012.800 600584.600 Drilling Office 2.5.1100.0 Prudhoe Bay Unit - WOA\Z-PAD\Plan Z-69 (NJ) v6\Plan Z-692-69 (P14) 5/1/2012 1:59 PM Page 3 of 3 )'l Schlumberger WELL Plan Z-69 (P14) FI5`D Prudhoe Bay Unit - WOA s.RDD'N Z -PAD Ma6ne[IC Parame[ersNADP A—St&e Plane Zme 04, US Fee. iccdlamuc MMd.. GGGM 3011 pp: 60996' Dere Oaemhn 31, 301 '177. 1]53.998 ain9: 5959339.91605 GnE Cmc: U c3n54pS" Sld.. ZE91NJl ND Rd: Rvxytetle196.9R ebwe MSLI Mp 0.c. 36.416' FS.. 5]635.tniL W 149 1124,511 Eac11n9: 3.15 ftUS S—F.1 O. 9511% Plan: Z591P141 Sny Dale: J s 0 0 0 m m U 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 -1000 0 1000 2000 3000 4000 Vertical Section (ft) Azim = 9.52°Scale = 1:1000 (ft) Origin = 0 N/ -S, 0 E/ -W 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 by 0 Schlumberger WELL Plan Z-69 (P14) D Prudhoe Bay Unit - WOA 6TRUCURE Z -PAD Magnetic Par Surf ce LmM— Naos M-6�ete Plaee,Zeo 4, U6 Feet ce9an Modtl: BGGM 2011 Dp: 80.996° Date: December 31, 301] Lat'.a N ]01]52.966 Nmlhing'. 5959239.94 RUS Gnd Com: 0.]6245406' Slot: a Z-69 Md) ND Ref. -, TxMe)96aa a hove MSL) Mag Dec: 20.416° FS'. 51636.1 nT Lm: .1.1124.511 Easting: 6000030.5 ftU6 Scale Fact 0.99991136 Z-69 (P14) 6rvy Date: June 18, 2010 3750 3000 2250 A A A z <<< W Scale= 1:750(ft) E >>> -1500 -750 0 750 1500 2250 TD \ n 1500 m U J; v v v 750 0 -750 -1500 -750 0 750 1500 2250 <<< W Scale= 1:750(ft) E >>> 3750 3000 2250 A A A z x 0 LO r 1500 m m U U) v v v 750 0 -750 Cry 21100 End Cry KOP Cry 1/100 ......................................................... ........................... .....................................i.....................................:.....................................:........... RTE Cry 3/100 Z-69 Hardline End C,Z-69 Fault # Cry 3/100 .................................. ........................ ..:.......... .............. .... .... :..................................... End Cry :..................................... .............................. ...... 3-518" Cry 3/100: -1500 -750 0 750 1500 2250 <<< W Scale= 1:750(ft) E >>> 3750 3000 2250 A A A z x 0 LO r 1500 m m U U) v v v 750 0 -750 U 2 L 2 1 1 1 0 100 200 300 400 500 60U IOU 8UU 9UU 1000 11UU 1ZOO 13UU 1 Measured Depth (200 ft/in) v6/Plan #5 Z-2' 6 3 G v6 Plan #18 Z- 15 1• n Kup Z-1 5 (NG) v Plan #18 Z- 15 9 K a.2115 (N Plan 8 Z-115 6 2 Ian h Z- 16 (NI) v6/F Ian Z-21 - 3 6 Plan Sch Z-21 9 11 Project: Prudhoe Bay Site: PB Z Pad Well: Plan Ivi Z-69 (P14) Wellbore: Plan Z-69 Design: Plan #14 Z-69 5 3 -1132-113 z B /Plan h Z-213 ( L) v6/Plan #3 Z-213 v6 5 1 v6 3- 16(NI)v6/ 16(NI)v61 Ian #2 6 v6 3 Plan h Z-216 (IN 11) v6/Plan Z-216 v6 1 r 3 0 100 200 300 400 500 60U IOU 8UU 9UU 1000 11UU 1ZOO 13UU 1 Measured Depth (200 ft/in) v6/Plan #5 Z-2' Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB Z Pad Site Error: 0.00ft Reference Well: Plan Ivi Z-69 (NJ) v6 Well Error: 0.00ft Reference Wellbore Plan Z-69 Reference Design: Plan #14 Z-69 Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well Plan Ivi Z-69 (NJ) v6 Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Z-69 planning 12Aprl2 @ 96.90ft (Doyon 25) True Minimum Curvature 1.00 sigma EDM .16 - ANC Prod - WH24P Offset Datum Reference Plan #14 Z-69 -ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen WARNING: There is hidden tight data in this project nterpolation Method: MD Interval 25.00ft Error Model: ISCWSA )epth Range: 40.80 to 11,020.66ft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,297.99ft Error Surface: Elliptical Conic Survey Tool Program Date 5/1/2012 From To (ft) (ft) Survey (Wellbore) Tool Name Description 40.80 500.00 Plan #14 Z-69 (Plan Z-69) GYD-GC-SS Gyrodata gyro single shots 500.00 2,000.00 Plan #14 Z-69 (Plan Z-69) MWD MWD - Standard 500.00 3,212.00 Plan #14 Z-69 (Plan Z-69) MWD+IFR+MS MWD + IFR + Multi Station 3,212.00 4,700.00 Plan #14 Z-69 (Plan Z-69) MWD MWD - Standard 3,212.00 10,258.00 Plan #14 Z-69 (Plan Z-69) MWD+IFR+MS MWD + IFR + Multi Station 10,258.00 11,020.66 Plan #14 Z-69 (Plan Z-69) MWD MWD - Standard 10,258.00 11,020.66 Plan #14 Z-69 (Plan Z-69) MWD+IFR+MS MWD + IFR + Multi Station 5/1/2012 2:18:48PM Page 2 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well Plan Ivi Z-69 (NJ) v6 Project: Prudhoe Bay ND Reference: Z-69 planning 12Aprl2 @ 96.90ft (Doyon 25) Reference Site: PB Z Pad MD Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Site Error: 0.00ft North Reference: True Reference Well: Plan Ivi Z-69 (NJ) v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-69 Database: EDM .16 - ANC Prod - WH24P Reference Design: Plan #14 Z-69 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB Chev Tr CHEV181112 - TR 18-11-12 - CHEV181112 9,748.88 9,500.00 1,108.24 617.07 495.73 Pass - Major Risk PB Z Pad Plan Ivi Z-34 (SM) v6 - Plan Z-34 - Plan #10b Z-34 1,988.12 1,950.00 191.97 41.59 150.56 Pass - Major Risk Plan Ivi Z-42 (NP) v6 - Plan Z-42 - Plan#6 Z-42 674.15 675.00 175.96 11.23 164.73 Pass - Major Risk Plan Ivi Z-51 (NA) v6 - Plan Ivi Z -Z51 - Plan #2 Z -f 514.28 500.00 170.72 8.40 162.38 Pass - Major Risk Plan Ivi Z-55 (SB) v6 - Plan Z-55 - Plan #4 Z-55 vE 1,600.71 1,575.00 113.89 27.12 86.79 Pass - Major Risk Plan Ivi Z-57 (ND) v6 - Plan Z-57 - Plan #4 Z-57 vt 664.73 650.00 120.45 11.43 109.03 Pass - Major Risk Plan Ivi Z-61 (NF) v6 - Plan Z-61 - Plan #5 Z-61 1,049.10 1,050.00 122.75 180.82 -54.81 FAIL - Major Risk Plan Ivi Z-62 (NC) v6 - Plan Z-62 - Plan #2 Z-62 vE 1,145.00 1,125.00 128.93 15.98 113.03 Pass - Major Risk Plan Ivi Z-66 (SC) v6 - Plan Z-66 - Plan #14 Z-66 431.39 425.00 200.25 7.94 192.31 Pass - Major Risk Plan Ivi Z-68 (SP) v6 - Plan Z-68 - Plan #7 Z-68 558.60 550.00 218.64 9.79 208.85 Pass - Major Risk Plan Ivi Z-70 (SF) v6 - Plan Z-70 - Plan # 17 Z-70 431.39 425.00 163.68 7.94 155.74 Pass - Major Risk Plan Kup Z-105 (SN) v6 - Plan Z-105 - Plan #4 Z-1 690.84 675.00 196.63 11.40 185.23 Pass - Major Risk Plan Kup Z-105 (SN) v6 - Plan Z-105PB1 - Plan # 690.84 675.00 196.63 11.71 184.92 Pass - Major Risk Plan Kup Z-114 (27+45) v6 - Plan Z-114 - Plan #1 5,577.92 5,050.00 578.54 69.67 519.28 Pass - Major Risk Plan Kup Z-115 (NG) v6 - Plan Z-115 wo/PH - Pla 730.92 725.00 59.20 13.04 46.17 Pass - Major Risk Plan Sch Z-201 (NM) v6 - Plan Z-201 - Plan #6 Z-; 812.74 800.00 131.28 12.96 118.32 Pass - Major Risk Plan Sch Z-202 (NB) v6 - Plan Z-202 - Plan #2 Z-2 339.38 325.00 151.17 6.25 144.93 Pass - Major Risk Plan Sch Z-203 (SO) v6 - Plan Z-203 - Plan #3 Z-: 389.40 375.00 207.74 7.18 200.56 Pass - Major Risk Plan Sch Z-211 (SJ) v6 - Plan Z-211 - Plan #5 Z-2 1,292.29 1,275.00 54.96 21.11 33.90 Pass - Major Risk Plan Sch Z-212(NO) v6 - Plan Z-212 - Plan #3 Z-2 439.38 425.00 161.06 8.01 153.06 Pass - Major Risk Plan Sch Z-213 (NL) v6 - Plan Z-213 - Plan #3 Z-2 414.39 400.00 30.76 7.60 23.16 Pass - Major Risk Plan Sch Z-214 (SK) v6 - Plan Z-214 - Plan #2 Z-2 962.36 950.00 108.13 15.31 92.83 Pass - Major Risk Plan Sch Z-215 (SH) v6 - Plan Z-215 - Plan #2 Z-2 1,081.57 1,075.00 48.84 17.42 31.44 Pass - Major Risk Plan Sch Z-216 (ND v6 - Plan Z-216 - Plan #2 Z-2 539.10 525.00 13.33 9.82 3.52 Pass - Major Risk Plan Sch Z-217 (NN) v6 - Plan Z-217 - Plan #3 Z-� 489.19 475.00 146.51 8.83 137.70 Pass - Major Risk Plan Sch Z-218 (NE) v6 - Plan Z-218 - Plan #2 Z-2 539.37 525.00 90.66 9.56 81.11 Pass - Major Risk Z-01 - Z-01 - Z-01 4,033.09 4,000.00 598.49 60.64 537.96 Pass - Major Risk Z-01 - Z -01A - Z -01A 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01 APB1 - Z-01 APB1 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01 APB2 - Z-01 APB2 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01 B - Z-01 B 4,033.09 4,000.00 598.49 60.64 537.96 Pass - Major Risk Z-03 - Z-03 - Z-03 3,920.29 4,000.00 285.69 74.13 212.96 Pass - Major Risk Z-03 - Z -03A - Z -03A 3,920.29 4,000.00 285.69 74.19 212.83 Pass - Major Risk Z-100 - Z-100 - Z-100 939.92 925.00 388.66 12.93 375.75 Pass - Major Risk Z-103 - Z-103 - Z-103 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-103 - Z-103PB1 - Z-103PB1 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-103 - Z-103PB2 - Z-103PB2 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-11 - Z-11 - Z-11 4,077.15 4,050.00 269.62 66.69 203.05 Pass - Major Risk Z-11 - Z-1 1A - Z-1 1A 4,077.15 4,050.00 269.62 66.69 203.05 Pass - Major Risk Z-113 - Z-113 - Z-113 730.75 725.00 43.45 10.78 32.82 Pass - Major Risk Z-113 - Z-113PB1 - Z-113PB1 730.75 725.00 43.45 10.94 32.66 Pass - Major Risk Z-12 - Z-12 - Z-12 4,389.91 4,300.00 292.25 67.87 224.43 Pass - Major Risk Z-13 - Z-13 - Z-13 1,991.77 1,950.00 391.30 38.79 352.52 Pass - Major Risk Z-13 - Z-1 3A - Z-1 3A 2,000.23 1,950.00 391.43 39.01 352.44 Pass - Major Risk Z-13 - Z-13APB1 - Z-13APB1 2,000.23 1,950.00 391.43 39.01 352.44 Pass - Major Risk Z-14 - Z-14 - Z-14 1,990.21 1,950.00 351.66 40.40 311.27 Pass - Major Risk Z-14 - Z -14A - Z -14A 1,990.21 1,950.00 351.66 40.40 311.27 Pass - Major Risk Z-14 - Z -14B - Z-148 1,999.14 1,950.00 351.81 40.65 311.18 Pass - Major Risk Z-15 - Z-15 - Z-15 1,845.88 1,850.00 282.79 39.27 243.93 Pass - Major Risk Z-16 - Z-16 - Z-16 1,836.68 1,750.00 322.42 46.65 281.26 Pass - Major Risk Z-16 - Z-1 6A - Z -16A 1,836.68 1,750.00 322.42 46.65 281.26 Pass - Major Risk 5/1/2012 2:18:48PM Page 3 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well Plan Ivi Z-69 (NJ) v6 Project: Prudhoe Bay ND Reference: Z-69 planning 12Aprl2 @ 96.90ft (Doyon 25) Reference Site: PB Z Pad MD Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Site Error: 0.00ft North Reference: True Reference Well: Plan Ivi Z-69 (NJ) v6 Survey Calculation Method: Minimum Curvature Well Error: 0,00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-69 Database: EDM .16 - ANC Prod - WH24P Reference Design: Plan #14 Z-69 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB Z Pad Z-17 - Z-17 - Z-17 2,742.42 2,750.00 74.16 60.09 17.93 Pass - Major Risk Z-18 - Z-18 - Z-18 1,913.58 1,875.00 154.95 44.71 116.93 Pass - Major Risk Z-19 - Z-19 - Z-19 1,182.45 1,175.00 211.93 28.66 183.33 Pass - Major Risk Z-19 - Z-1 9A - Z-1 9A 1,186.34 1,175.00 211.97 28.76 183.26 Pass - Major Risk Z-20 - Z-20 - Z-20 1,780.43 1,750.00 164.58 33.90 130.73 Pass - Major Risk Z-23 - Z-23 - Z-23 5,203.32 4,875.00 384.34 54.06 330.42 Pass - Major Risk Z-23 - Z -23A - Z -23A 5,194.66 4,850.00 384.20 54.07 330.33 Pass - Major Risk Z-23 - Z-23ALl - Z -23B 5,203.35 4,875.00 384.34 54.17 330.31 Pass - Major Risk Z-23 - Z -23B - Z -23B 5,194.64 4,850.00 384.20 53.96 330.44 Pass - Major Risk Z-24 - Z-24 - Z-24 6,887.29 6,200.00 276.41 104.95 185.27 Pass - Major Risk Z-25 - Z-25 - Z-25 1,421.80 1,425.00 489.13 28.05 461.10 Pass - Major Risk Z-26 - Z-26 - Z-26 1,302.76 1,300.00 452.61 21.93 430.69 Pass - Major Risk Z-26 - Z -26A - Z -26A 1,302.76 1,300.00 452.61 21.93 430.69 Pass - Major Risk Z-39 - Z-39 - Z-39 3,372.87 3,375.00 180.92 64.35 117.88 Pass - Major Risk Z-39 - Z -39A - Z -39A 3,372.87 3,375.00 180.92 64.40 117.83 Pass - Major Risk Z-40 - Z-40 - Z-40 281.59 275.00 142.73 4.96 137.77 Pass - Major Risk Z-50 - Z-50 - Plan #8 Z-50 v6 4,133.06 4,050.00 172.53 55.85 117.20 Pass - Major Risk Z-50 - Z-50 - Z-50 4,107.46 4,025.00 165.12 62.18 104.56 Pass - Major Risk Z-65 - Z-65 - Z-65 2,178.16 2,125.00 100.77 36.80 67.17 Pass - Major Risk Z-65 - Z-65PB1 - Plan #13 Z-65 approved 2,030.66 1,975.00 101.80 38.91 68.93 Pass - Major Risk Z-65 - Z-65PB1 - Z-65PB1 2,178.16 2,125.00 100.77 36.80 67.17 Pass - Major Risk 511/2012 2:18:48PM Page 4 of 5 COMPASS 2003.16 Build 73 Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB Z Pad Site Error: 0.00ft Reference Well: Plan Ivi Z-69 (NJ) v6 Well Error: 0.00ft Reference Wellbore Plan Z-69 Reference Design: Plan #14 Z-69 Anticollision Report Local Co-ordinate Reference TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well Plan Ivi Z-69 (NJ) v6 Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) True Minimum Curvature 1.00 sigma EDM .16 - ANC Prod - WH24P Offset Datum teference Plan #14 Z-69 'ilter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of refen WARNING: There is hidden tight data in this project nterpolation Method: MD Interval 25.00ft Error Model: ISCWSA )epth Range: 40.80 to 11,020.66ft Scan Method: Tray. Cylinder North tesults Limited by: Maximum center -center distance of 1,297.99ft Error Surface: Elliptical Conic Survey Tool Program Date 5/1/2012 From To (ft) (ft) Survey (Wellbore) 40.80 500.00 500.00 3,212.00 3,212.00 10,258.00 10,258.00 500.00 Plan #14 Z-69 (Plan Z-69) 2,000.00 Plan #14 Z-69 (Plan Z-69) 3,212.00 Plan #14 Z-69 (Plan Z-69) 4,700.00 Plan #14 Z-69 (Plan Z-69) 10,258.00 Plan #14 Z-69 (Plan Z-69) 11,020.66 Plan #14 Z-69 (Plan Z-69) 11,020.66 Plan #14 Z-69 (Plan Z-69) Tool Name Description GYD-GC-SS Gyrodata gyro single shots MWD MWD - Standard MWD+IFR+MS MWD + IFR + Multi Station MWD MWD - Standard MWD+IFR+MS MWD + IFR + Multi Station MWD MWD - Standard MWD+IFR+MS MWD + IFR + Multi Station 5/1/2012 2:20:58PM Page 2 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well Plan Ivi Z-69 (NJ) v6 Project: Prudhoe Bay TVD Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Reference Site: PB Z Pad MD Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Site Error: 0.00ft North Reference: True Reference Well: Plan Ivi Z-69 (NJ) v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-69 Database: EDM .16 - ANC Prod - WH24P Reference Design: Plan #14 Z-69 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB Chev Tr CHEV181112 - TR 18-11-12 - CHEV181112 9,748.88 9,500.00 1,108.24 617.07 495.73 Pass - Major Risk PB Z Pad Plan Ivi Z-34 (SM) v6 - Plan Z-34 - Plan #10b Z-34 1,988.12 1,950.00 191.97 41.59 150.56 Pass - Major Risk Plan Ivi Z-42 (NP) v6 - Plan Z-42 - Plan#6 Z-42 674.15 675.00 175.96 11.23 164.73 Pass - Major Risk Plan Ivi Z-51 (NA) v6 - Plan Ivi Z -Z51 - Plan #2 Z -E 514.28 500.00 170.72 8.40 162.38 Pass - Major Risk Plan Ivi Z-55 (SB) v6 - Plan Z-55 - Plan #4 Z-55 vE 1,600.71 1,575.00 113.89 27.12 86.79 Pass - Major Risk Plan Ivi Z-57 (ND) v6 - Plan Z-57 - Plan #4 Z-57 vl 664.73 650.00 120.45 11.43 109.03 Pass - Major Risk Plan Ivi Z-61 (NF) v6 - Plan Z-61 - Plan #5 Z-61 861.52 850.00 84.58 61.12 23.53 Pass - Minor 1/200 Plan Ivi Z-62 (NC) v6 - Plan Z-62 - Plan #2 Z-62 vt 1,145.00 1,125.00 128.93 15.98 113.03 Pass - Major Risk Plan Ivi Z-66 (SC) v6 - Plan Z-66 - Plan #14 Z-66 431.39 425.00 200.25 7.94 192.31 Pass - Major Risk Plan Ivi Z-68 (SP) v6 - Plan Z-68 - Plan #7 Z-68 558.60 550.00 218.64 9.79 208.85 Pass - Major Risk Plan Ivi Z-70 (SF) v6 - Plan Z-70 - Plan # 17 Z-70 431.39 425.00 163.68 7.94 155.74 Pass - Major Risk Plan Kup Z-105 (SN) v6 - Plan Z-105 - Plan #4 Z-1 690.84 675.00 196.63 11.40 185.23 Pass - Major Risk Plan Kup Z-105 (SN) v6 - Plan Z-105PB1 - Plan # 690.84 675.00 196.63 11.71 184.92 Pass - Major Risk Plan Kup Z-114 (27+45) v6 - Plan Z-114 - Plan #1 5,577.92 5,050.00 578.54 69.67 519.28 Pass - Major Risk Plan Kup Z-115 (NG) v6 - Plan Z-115 wo/PH - Pla 730.92 725.00 59.20 13.04 46.17 Pass - Major Risk Plan Sch Z-201 (NM) v6 - Plan Z-201 - Plan #6 Z-: 812.74 800.00 131.28 12.96 118.32 Pass - Major Risk Plan Sch Z-202 (NB) v6 - Plan Z-202 - Plan #2 Z-: 339.38 325.00 151.17 6.25 144.93 Pass - Major Risk Plan Sch Z-203 (SO) v6 - Plan Z-203 - Plan #3 Z- 389.40 375.00 207.74 7.18 200.56 Pass - Major Risk Plan Sch Z-211 (SJ) v6 - Plan Z-211 - Plan #5 Z-2 1,292.29 1,275.00 54.96 21.11 33.90 Pass - Major Risk Plan Sch Z-212(NO) v6 - Plan Z-212 - Plan #3 Z-2 439.38 425.00 161.06 8.01 153.06 Pass - Major Risk Plan Sch Z-213 (NL) v6 - Plan Z-213 - Plan #3 Z-2 414.39 400.00 30.76 7.60 23.16 Pass - Major Risk Plan Sch Z-214 (SK) v6 - Plan Z-214 - Plan #2 Z-2 962.36 950.00 108.13 15.31 92.83 Pass - Major Risk Plan Sch Z-215 (SH) v6 - Plan Z-215 - Plan #2 Z-2 1,081.57 1,075.00 48.84 17.42 31.44 Pass - Major Risk Plan Sch Z-216 (ND v6 - Plan Z-216 - Plan #2 Z-2 539.10 525.00 13.33 9.82 3.52 Pass - Major Risk Plan Sch Z-217 (NN) v6 - Plan Z-217 - Plan #3 Z-: 489.19 475.00 146.51 8.83 137.70 Pass - Major Risk Plan Sch Z-218 (NE) v6 - Plan Z-218 - Plan #2 Z-2 539.37 525.00 90.66 9.56 81.11 Pass - Major Risk Z-01 - Z-01 - Z-01 4,033.09 4,000.00 598.49 60.64 537.96 Pass - Major Risk Z -01 -Z -01A -Z -01A 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01 APB1 - Z-01 APB1 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01APB2 - Z-01APB2 4,033.09 4,000.00 598.49 60.74 537.85 Pass - Major Risk Z-01 - Z-01 B - Z-01 B 4,033.09 4,000.00 598.49 60.64 537.96 Pass - Major Risk Z-03 - Z-03 - Z-03 3,920.29 4,000.00 285.69 74.13 212.96 Pass - Major Risk Z-03 - Z -03A - Z -03A 3,920.29 4,000.00 285.69 74.19 212.83 Pass - Major Risk Z-100 - Z-100 - Z-100 939.92 925.00 388.66 12.93 375.75 Pass - Major Risk Z-103 - Z-103 - Z-103 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-103 - Z-103PB1 - Z-103PB1 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-103 - Z-103PB2 - Z-103PB2 3,874.13 3,900.00 203.41 55.11 149.20 Pass - Major Risk Z-11 - Z-11 - Z-11 4,077.15 4,050.00 269.62 66.69 203.05 Pass - Major Risk Z-11 - Z-1 1A - Z-1 IA 4,077.15 4,050.00 269.62 66.69 203.05 Pass - Major Risk Z-113 - Z-113 - Z-113 730.75 725.00 43.45 10.78 32.82 Pass - Major Risk Z-113 - Z-113PB1 - Z-113PB1 730.75 725.00 43.45 10.94 32.66 Pass - Major Risk Z-12 - Z-12 - Z-12 4,389.91 4,300.00 292.25 67.87 224.43 Pass - Major Risk Z-13 - Z-13 - Z-13 1,991.77 1,950.00 391.30 38.79 352.52 Pass - Major Risk Z-13 - Z-1 3A - Z-1 3A 2,000.23 1,950.00 391.43 39.01 352.44 Pass - Major Risk Z-13 - Z-13APB1 - Z-13APB1 2,000.23 1,950.00 391.43 39.01 352.44 Pass - Major Risk Z-14 - Z-14 - Z-14 1,990.21 1,950.00 351.66 40.40 311.27 Pass - Major Risk Z-14 - Z -14A - Z -14A 1,990.21 1,950.00 351.66 40.40 311.27 Pass - Major Risk Z-14 - Z -14B -Z-14B 1,999.14 1,950.00 351.81 40.65 311.18 Pass - Major Risk Z-15 - Z-15 - Z-15 1,845.88 1,850.00 282.79 39.27 243.93 Pass - Major Risk Z-16 - Z-16 - Z-16 1,836.68 1,750.00 322.42 46.65 281.26 Pass - Major Risk Z-16 - Z -16A - Z-1 6A 1,836.68 1,750.00 322.42 46.65 281.26 Pass - Major Risk 5/1/2012 2:20:58PM Page 3 of 5 COMPASS 2003.16 Build 73 Anticollision Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well Plan Ivi Z-69 (NJ) v6 Project: Prudhoe Bay ND Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Reference Site: PB Z Pad MD Reference: Z-69 planning 12Apr12 @ 96.90ft (Doyon 25) Site Error: 0.00ft North Reference: True Reference Well: Plan Ivi Z-69 (NJ) v6 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan Z-69 Database: EDM .16 - ANC Prod - WH24P Reference Design: Plan #14 Z-69 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well - Wellbore - Design (ft) (ft) (ft) (ft) PB Z Pad Z-17 - Z-17 - Z-17 2,742.42 2,750.00 74.16 60.09 17.93 Pass - Major Risk Z-18 - Z-18 - Z-18 1,913.58 1,875.00 154.95 44.71 116.93 Pass - Major Risk Z-19 - Z-19 - Z-19 1,182.45 1,175.00 211.93 28.66 183.33 Pass - Major Risk Z-19 - Z-1 9A - Z-1 9A 1,186.34 1,175.00 211.97 28.76 183.26 Pass - Major Risk Z-20 - Z-20 - Z-20 1,780.43 1,750.00 164.58 33.90 130.73 Pass - Major Risk Z-23 - Z-23 - Z-23 5,203.32 4,875.00 384.34 54.06 330.42 Pass - Major Risk Z-23 - Z -23A - Z -23A 5,194.66 4,850.00 384.20 54.07 330.33 Pass - Major Risk Z-23 - Z-23ALl - Z -23B 5,203.35 4,875.00 384.34 54.17 330.31 Pass - Major Risk Z-23 - Z -23B - Z -23B 5,194.64 4,850.00 384.20 53.96 330.44 Pass - Major Risk Z-24 - Z-24 - Z-24 6,887.29 6,200.00 276.41 104.95 185.27 Pass - Major Risk Z-25 - Z-25 - Z-25 1,421.80 1,425.00 489.13 28.05 461.10 Pass - Major Risk Z-26 - Z-26 - Z-26 1,302.76 1,300.00 452.61 21.93 430.69 Pass - Major Risk Z-26 - Z -26A - Z -26A 1,302.76 1,300.00 452.61 21.93 430.69 Pass - Major Risk Z-39 - Z-39 - Z-39 3,372.87 3,375.00 180.92 64.35 117.88 Pass - Major Risk Z-39 - Z -39A - Z -39A 3,372.87 3,375.00 180.92 64.40 117.83 Pass - Major Risk Z-40 - Z-40 - Z-40 281.59 275.00 142.73 4.96 137.77 Pass - Major Risk Z-50 - Z-50 - Plan #8 Z-50 v6 4,133.06 4,050.00 172.53 55.85 117.20 Pass - Major Risk Z-50 - Z-50 - Z-50 4,107.46 4,025.00 165.12 62.18 104.56 Pass - Major Risk Z-65 - Z-65 - Z-65 2,178.16 2,125.00 100.77 36.80 67.17 Pass - Major Risk Z-65 - Z-65PB1 - Plan #13 Z-65 approved 2,030.66 1,975.00 101.80 38.91 68.93 Pass - Major Risk Z-65 - Z-65PB1 - Z-65PB1 2,178.16 2,125.00 100.77 36.80 67.17 Pass - Major Risk 5/1/2012 2:20:58PM Page 4 of 5 COMPASS 2003.16 Build 73 � 1rem ��Ar �►�l�ll r be �►�J ri$!ea ` .tV-AM �:�ii • 3^ 4�.►s�I� �� r �'� a �► ice'► n .r � moi► �„�, . �• r dol► mS r VG n►aie►+w►9.. ov �•., hili``. �� �I/�"�" /� pY . Y Ji ����j' i✓ate • ��� P . • r. OV Ali P�'� NVE " VKR - IJLI,ND `Sfil AR— M� 2 `M' I 7 0 I I ANNULAR 2 JUPPER PIPE R.", 3 1BLIND/SHEAR RAMS 4 LOWER PIPE RAMS 5 CHOKE 6 KitL 7 AUXILIARY a BY-PASS �I 0 9 ■ 8 ■ 7 ■ 112 ■ 108 ■ 3 ■ 2 ■ 1 ■ 39 ■ L_j 11 ■ LEGEND 341 12 ■ AS -BUILT CONDUCTOR 13 ■ 4Z2i 14 ■ ■ EXISTING WELL CONDUCTOR 15 ■ 16 ■ 17 ■ 18 m 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAO 27. 19 0 Z -PAD 20 ■ 2, HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL 50 55 51i 202 S66 D 57 65 70 SG 16- 6181 2151 113 2141 24i NK6i 13 2131 7. DATES OF SURVEY: JUNE 28-30, JULY 1-2, 2011. ■ 33 ■ 32 ■ 31 ■ 30 ■ 29 ■ 21 O ■ 28 ■ 102i 1 116i ■104i 111 114i ■ 103i ■ SPARE -A III P -504A ■ P -504B ■ 21 ■ 22 ■ 23 ■ 24 ■ 25 ■ 26 ■ SLOT 1 ■ SLOT 2 ■ Z-100 ■ SLOT 4 ■ 101 1 V-?� G _. SPINE RD J- r W -PAG` I Z -PAD 1 m I ~ Y J ' S, t THIS PROJECT ...4q%, , hard F. Allison 608 •' VICINITY MAP NTS SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF JULY 02, 2011. L_j LEGEND 341 21071 AS -BUILT CONDUCTOR 203 68 4Z2i ■ EXISTING WELL CONDUCTOR NOTES 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAO 27. 2, HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAD MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. 5. GEODETIC DATUM IS NAD27. 6. PAD AVERAGE SCALE FACTOR IS 0.999911213. 7. DATES OF SURVEY: JUNE 28-30, JULY 1-2, 2011. 8. REFERENCE FIELD BOOKS: NS11-44 PGS, 1-75; NS11-46 PGS. 1-9. AS -BUILT WELL CONDUCTORS: 34i, 40, 42, 50, 51i, 55, 57, 61, 62, 65, 66, 68, 69, 70, 105, 113, 115, 201, 202, 203, 211i, 212i, 213i, 214i, 2154 2161, 217i, 218% SO, SG, SL, NK F. Rabe!'i.--.. rnAn! BARNHART J bellsFRB1 atAgg7!C woz x1WOA Z -PAD assoc.tea. WRD PAD EXPANSION 1. 1 !� R* Ana+ u . ,, c +a. AS -BUILT WELL CONDUCTORS 1 # 3 �a aAte aenslON LOCATED WITHIN PROTRACTED SEC. 19, T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS 34I Y= 5,959,100.13 N= 1,179.09 70'17'51.597" 70.2976658' 56.1' 4,292' FSL FRB11 WOZ 21 X= 600,125.84 E= 1,870.12 149'11'20.998" 149.1891661' 2,552' FEL 00 1 1 ISSUED FOR INFORMATION !1F9 �� Y= 5,959,100.17 N= 1324.00 70'17'51.616" 70.2976711° 4,294' FSL 40 X= 599,980.94 E= 1870.16 149'11'25.221" 149.1903392' 56'0' 2,697' FEL 42 Y=5,959,239.95 N= 1,126.45 70'17'52.965" 70.2980458' 56'0 4,431' FSL X= 600,178.47 E= 2,009.96 149'11'19.409" 149.1887247' 2,497' FEL 50 Y= 5,959,100.19 N= 1,473.93 70'17'51.636" 70.2976767° 56.2' 4,296' FSL X= 599,831.02 E= 1,870.18 149'11'29.591" 149.1915531' 2,847' FEL 51 i Y=5,959,240.04 N= 1,466.46 70'17'53.011" 70.2980586' 55'9 4,435' FSL X= 599,838.49 E= 2,010.05 149°11'29.319" 149.1914775' 2,837' FEL 55 Y= 5,959,100.12 N= 1,458.95 70'17'51.634" 70.2976761' 56.1' 4,295' FSL X= 599,846.00 E= 1,870.11 149°11'29.155" 149.1914319' 2,832' FEL 57 Y=5,959,240.04 N= 1,421.49 70'17'53.005" 70.2980569' 55'9 4,435' FSL 12,792' X= 599,883.46 E= 2,010.05 149'11'28.009" 149.1911136' FEL 61 Y=5,959,239.97 N= 1,376.44 70'17'52.998" 70.2980550' 55.9' 4,434' FSL #2 X= 599,928.50 E= 2,009.98 149'11'26.695" 149.1907486" 747' FEL 62 Y=5,959,239.94 N= 1,436.45 70°17'53.006" 70.2980572' 56'0 4,435' FSL X= 599,868.50 E= 2,009.95 149'11'28.445" 149.1912347' 2,807' FEL 65 Y= 5,959,100.15 N= 1,398.94 70°17'51.626" 70.2976739' 56.1' 4,295' FSL X= 599,906.01 E= 1,870.14 149'11'27.405" 149.1909458° 2,772' FEL Y= 5,959,100.11 N= 1,443.99 70'17'51.632" 70.2976756° 56'2 4,295' FSL 66 X= 599,860.96 E= 1,870.11 149'11'28.719" 149.1913108' 2,817' FEL 68 Y=5,959,100.23 N= 1,134.00 70'17'51.592" 70.2976644° 55.9' 4,291' FSL X= 600,170.92 E= 1,870.22 149'11'19.683" 149.1888008' 2,507' FEL 69 Y=5,959,239.94 • N= 1,301.49 70°17'52.988" 70.2980522° 56'1' 4,433' FSL X= 600,003.45• E= 2,009.95 149'11'24.511" 149.1901419' 2,672' FEL 70 Y= 5,959,100.10 N= 1,384.02 70'17'51.624" 70.2976733° 56.2' 4,294' FSL X= 599,920.93 E= 1,870.09 149'11'26.971" 149.1908253° 2,757' FEL 105 Y=5,959,100.05 N= 1,163.88 70'17'51.594" 70.2976650° 55'9 4,291' FSL X= 600,141.04 E= 1,870.04 149'11'20.554" 149.1890428' 2,537' FEL 113 Y=5,959,239.90 N= 1,346.45 70'17'52.994" 70.2980539'4,434' 560'' FSL X= 599,958.49 E= 2,009.91 149'11'25.821" 149.1905058' 2,717' FEL 115 IY=5,959,240.03 N= 1,361.38 70'17'52.997" 70.2980547' 55.9'4,434' FSL X= 599,943.56 E= 2 010.04 149'11'26.256" 149.1906267'2,732' FEL NOTES: 1. ALASKA STATE PLANE COORDINATES ARE NAD27, ZONE 4. 2. HORIZONTAL CONTROL IS BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAD MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. 5. PAD AVERAGE SCALE FACTOR IS 0.999911213. AS -BUILT WELL CONDUCTORS: 34i, 40, 42, 50, 51i, 55, 57. 61, 62. 65, 66, 68, 69, 70, 105, 113, 115, 201, 202, 203, 2111, 2121, 213i, 2141, 2151, 2161, 2171, 2181, SD, SG, SL, NK FRob VRAM BARNHART JACOBS by kiloOPAVNG DAR ,,,, _ pppppp 'I as nuc. FRB11 WOZ 21 woA Z PAD WRD PAD EXPANSION AS -BUILT WELL CONDUCTORS _FT z oF'3 �� c I^ = 200. 00 1 1 ISSUED FOR INFORMATION !1F9 �� wn,at.cc ,uas°• sws t1, n. +:t+a LOCATED WITHIN PROTRACTED SEC. 19, T. 11 N., R. 12 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC GRAVEL SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) PAD ELEV. OFFSETS 201 Y=5,959,240.18 N= 1,171.46 70'17'52.973" 70.2980481' 56.6` 4,432' FSL X= 600,133.47 E= 2,010.19 149°11'20.721" 149.1890892' 2,542' FEL 202 Y=5,959,239.94 N= 1,451.46 70'17'53.008" 70.2980578° 55.9' 4,435' FSL X= 599,853.49 E= 2,009.95 149°11'28.882" 149.1913561' 2,822` FEL 203 Y=5,959,100.03 N= 1,148.96 70°17'51.592" 70.2976644° 56.0' 4,291' FSL 12,522' X= 600,155.96 E= 1 870.02 149°11'20.119" 149.1889219' FEL 211i Y=5,959,100.23 N= 1,308.95 70'17'51.615" 70.2976708°4,293' 55.9' FSL X= 599,995.99 E= 1,878.22 149°11'24.783" 149.1902175' 2,682' FEL 2121 Y= 5,959,240.11 N= 1,141.47 70'17`52.969" 70.2980469° 56.4' 4,431' FSL X= 600,163.45 E= 2,010.12 149°11'19.847" 149.1888464' 2,512' FEL 213i Y=5,959,240.04 N= 1,271.44 70'17'52.985" 70.2980514' 56.1' 4,433' FSL X= 600,033.50 E= 2,010.05 149'11'23.635" 149.1898986° 2,642' FEL 2141 Y=5,959,100.25 IX= N= 1,293.88 70'17'51.613" 70.2976703'4,293' 56'2 FSL 600,011.06 E= 1,870.24 149'11'24.343" 149.1900953' 2,667' FEL 2151 Y= 5,959,100.14 N= 1,354.05 70'17'51.620" 70.2976722' 56.2' 4,294' FSL X= 599,950.89 E= 1,870.13 149'11'26.097" 149.1905825° 2,727' FEL 216i Y=5,959,240.09 N= 1,316.42 70'17'52.992" 70.2980533° 56'0 4,433' FSL X= 599,988.52 E= 2,010.10 149'11'24.946" 149.1902628' 2,687` FEL 2171 Y=5,959,239.98 N= 1,156.36 70°17'52.970" 70.2980472' 56.2' 4431' FSL X= 600,148.56 E= 2,009.99 149°11'20.281" 149.1889669' 2,'5 27' FEL 2181 IX= Y=5,959,239.98 N= 1,391.46 70°17'53.000" 70.2980556°4,434' 55.9' FSL 599,913.48 E= 2,009.99 149'11'27.133" 149.1908703' 2,762' FEL SD IY= 5,959,100.11 N= 1,429.03 70°17'51.630" 70.2976750'4,295' 56.4' FSL X= 599,875.92 E= 1,870.10 149°11'28.283" 149.1911897' 2,802' FEL SG Y=5,959,100.09 N= 1,369.02 70°17'51.621" 70.2976725° 56'2 4,294' FSL X= 599,935.92 E= 1,870.08 149'11'26.533" 149.1907036' 2,742' FEL SL Y= 5,959,100.01 N= 1,279.00 70'17'51.609" 70.2976692' 56.3' 4,293' FSL X= 600,025.94 E= 1,870.00 149°11'23.910" 149.1899750° 2,652' FEL NK Y=5,959,239.85 N= 1,286.54 70°17'52.985" 70.2980514°4,433' 56.0' FSL I X= 600,018.40 1 E= 2,009.86 149°11'24.075' 1 149.1900208' 2,657' FEL NOTES: 1. ALASKA STATE PLANE COORDINATES ARE NAD27, ZONE 4. 2. HORIZONTAL CONTROL 13 BASED ON Z PAD CONTROL MONUMENTS MON 2 AND MON 3. 3. VERTICAL CONTROL IS BASED ON Z PAD MONUMENTATION. 4. ELEVATIONS ARE BPX MEAN SEA LEVEL (M.S.L.) DATUM. 5. PAD AVERAGE SCALE FACTOR IS 0.999911213. 6. ALPHA NAME DESIGNATIONS REFER TO BPX DRILLING SURFACE SLOT NAME AS—BUILT WELL CONDUCTORS: 34i, 40, 42. 50, 51i, 55. 57. 61, 62, 65, 66, 68, 69, 70. 105. 113. 115, 201, 202, 203. 2111. 212i, 213i, 214i, 2151. 2161, 217i, 218i, SO, SG, SL. NK -T by jw7/1 /11 �wm , rxn a 1114"L oo NoWOA Z—PAD lass WRD PAD EXPANSION KlI t = 2as AS—BUILT WELL CONDUCTORS 3 of 3 F 11 I 11 d 'a '104 , N 1-1 1w, INA �g CSO 8 NCSA -1 0 a a 0 afbais EnterlExft 540 Ii E LZ -6E9]86 6402 612 517 519 i CI -518X 506A SOGB 506 4-- 506D ■ 0 a 0 aaa a a a a a 0 0 a 0 am a FpTffl.. M-509 611 FIA 500x rlSurface ' sv, A 616A 00 38' 520A 5200 512 S Ferte r L73'- 507 E3 JF 5 t;1 1.4 2092' SCS 2 1/16-`. REWS ]D 120 GV :REWS )0 120 CV II! ��— I VV �..+J II.V M �'�J' 4 %2 00 7U81NG IJ��J luo KD 3p CES [p) [L a G3G°CT0Q)M Cz%LQ8KCQ D 0 H C - co PROPOSAL •025037,0 0H'D[E� ,04986'— REF: 00120MI0?4013 000ODM10224W c:):) I PRWATE a. CCt�'CtC;,.%, AL twtEu o- 2.1% $Kz,r:Eo �v151D� DESCN�" N •"• iC\1 "` I.00NOT SC.LETNISwe,nlc 'oL31++xE ULTHA-SL iMFiOIE awm+•.ruea.�.ronr.c +m.x,ca ....r DII[1510N5 r2 o.ov.morwxwa..w�nrl.a.a.r�won..cm.ea..rcocx_�.��K<.. �i. e.E.x sN.w mcEz 0, PRODUCERS OR INJEC70R5 ICIDE co.WR R41' .030 xx—_.o,s WELLHEAD SYSTEM I+EI D.-zoroi- Q W S,.o Am.e TbK�DS TO COWO� To (C0. STD. N-ZE •xxx _-.005 1 I T.vrAEn Ta..Ds TO COWOM. To -1 c.: - � I -5000 X 4 '. /! 6-5000 —� rppq.0.1a•ptaOML tIOreCR vO.l ti. t. pR,fINGs IN TMwD AwAE VROX4TION$ /�� LE. • N p rx1%ti KrP MP.Viw .lL R,.� DAi K1LCS ,x$T $1R,DV-E .t•� _.y ZL X /pi X 7 X 4 2 00:2�M 030690 ..y ,x.•o PtB r.ry.wrr w..c v.+ 1 �CoW CENTM ME LEOJu1O DlQO-02 Note: Dimensional information reflected on this drawing are estimated measurements only. XEst Est 171 ILM i i /0 x 0jJ 4-1 /16'* 5,0':''� - s 93.38" Est. U_lj 4-1,16' 5,000# Do J-ll�',1-Lll Est. i D` 4-1%16' 5,000::71 BP Alasl,e,Et SI\ --011583 03 ot CAMERON Meme Jeanette o_4 -1 -05J -6816-3I wo gr so # Page 1 of 1 Schwartz, Guy L (DOA) From: Honas, Kristopher [Kristopher.Honas@bp.com] Sent: Tuesday, June 12, 2012 8:13 AM To: Schwartz, Guy L (DOA) Subject: RE: Z-69 PTD (212-076) Attachments: Z-69 Permit To Drill Application Final revision 1.1 (6-12-12).ZIP Guy, Step #7 has been updated with the correct pressure of 3500 psi and the BOP configuration has been included. Please let me know if there is anything else I can include. Thank you, Kris Honas BP Rotary Drilling Engineer Desk: 907-564-4841 Cell: 907-268-0891 Kristopher.Honas@bp.com From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Monday, June 11, 2012 4:57 PM To: Honas, Kristopher Subject: Z-69 PTD (212-076) Kris, Your procedure requests 4000 psi BOP test for the initial test in step 7. 1 think you meant 3500 psi as you are testing all the casing no higher than 3500 psi during the operation. Very good, complete PTD application ( VBR or pipe , blind ) for the first test. Thanks, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 6/12/2012 don't forget to indicate the intial BOP configuration for step 7.... TRANSMITTAL LETTER CHECKLIST WELL NAME PTD# �71-1 '2,0 ?&. if Development Service Exploratory Stratigraphic Test Non -Conventional Well FIELD: 7 Lt/<ct_ `i POOL:t E 4 t� Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTILATERAL The permit is for a new wellbore segment of existing well (If last two digits in permit No. , API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - -) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through tar et zones. Non -Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 9/09/2011 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 _ PTD#: 2120760 CompanyB_P-EXPLORATION (ALASKA_) INC Initial Class/Type _Well Name: PRUDHOE BAY UN PBU Z-69 -__ -Program DEV _ Well bore seg ❑ DEV / PEND GeoArea 890 Unit 11650 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven, gas conforms to AS31.05.030(j.1..A),0.2_.A-D) - - - - - - - - - - - -- - - - NA_ - - - - - - - - - - - - - - _ - . - --- - - Date Commissioner Date 1 Permit fee attached NA- _ _ -- 2 Lease number appropriate_ Yes - Entire well in ADL 028262. - - - - U_ni_ ue well name and number - Yes - -- ------------- - 4 Well located in -a -defined pool Yes PRUDHOE BAY, PRUDHOE OIL - 64015, governed by CO 341_D 5 Well located proper -distance from- drilling unit_boundary------- Yes - - - - CO 341D, Rule 2: There shall be no restrictions as -to well spacing except - - - - - - - - - - - - - - - - - - - - 6 Well located proper distance from- other wells_ Yes - - - - that no pay shall be opened_ in a well closer than 50.0 feet tothe boundary 7 Sufficient acreage available in_drilling unit - - - - Yes - - - - - - - - - - - - - - - - - 8 -if-deviated, is -wellbore plat -included Yes 9 Operator only affected party - - Yes 10 Operator has -appropriate_ bond in force - - - - - Yes Appr Date 11 Permit_can be issued without conservation order_ Yes 12 Permit_can be issued without administrativ_e_approva_I Yes _ - _ _ _ _ _ _ _ _ _ SFD 6/8/2012 13 Can permit be approved before 15 -day wait_ Yes - - - - - 14 Well located within area and strata authorized by Injection Order # (put 10# in_comments)_(For_ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - .. - - - - - - _ 15 All wells -within 1/4_mil _e area of review identified (For service well only) NA_ - - - - - 16 Pre -produced injector: duraticn_of pre production Less_ than 3 months_ (For service well only) NA_ 118 Conductor string -provided - - - Yes Conductor will be set_at 80 and -cemented. Engineering 119 Surface casing, protects all known USDWs Yes No Aquifers ... 20 CMT_vol adequate to circulate on conductor & surf csg Yes Surface casing will be set at 3284' md_ and fully cemented._ 21 CMT_vol_adequate _to tie-in long string to surf csg No TOC for inter casing string is planned at 3950' md. 22 CMT will coverall known productive horizons Yes 4.5" liner will be. cemented and _pe fed with TCP 23 Casing designs adequate for CJ, BA -permafrost Yes BTC completed. 24 Adequate tankage or reserve pit Yes Rig has steel pits. All waste. to approved disposal wells. 25 .1fare-drill, has -a 1-0-403 for abandonment been approved - - - - - - - - - NA- - - - - - - grassroots welI...not applicable._ -- - -- - - - - - - i26 Adequate wellbore sepa ration proposed Yes -Proximity analysis performed:... planned well-Z-61_may _have issues but -will likely be moved when_drilled. 27 �28 If_diverter required, does it meet regulations- - - - - - _ _ Yes _ _ _ _ _ _ _ Paddle will_be_removed <1000'_ _ _ _ Appr Date D_ril_ling fluid program schematic & equip list adequate- Yes Max formation pressure -=-3721- psi (8.5 ppg_EMW)_ Will drill with 88, --1-0.4- mud-. GLS 6/12/2012 29 BOPEs,.do they meet regulation - Yes _ -- - - - - - - - - - - - - 30 _B_OPE_press rating appropriate; test to (put psig in comments)_ Yes - - - MASP= 2877 psi Will test BOP to 3500 psi .- . 31 Choke manifold complies w/API_RP-53 (May 84)_ - - - - Yes - - - - - - - - - - - - - 32 Work will occur without operation shutdown- --- - - - - Yes - - - - - - - - - - - - - 33 Is presence of H2S gas probable. Yes - - - - H2S on pad.- Rig has sensors and alarms._ 34 Mechanical condition of wells within AOR verified (For service well only) - NA- - - - - - - - - - - - - - - - - - - - - - - - - - 35 Permit can be issued w/o hydrogen s_ul_fiide measures - No. Z -Pad wells are-H2S-bearing. H2S measures are required. Geology 36 Data -presented on -potential overpressure zones - - - .. - - - - - - - - - . Yes Planned mud program- adequately balances varied pressures expected downhole. SFD Appr Date 37 Seismic analysis_of shallow gas -zones- - - - - - - - NA_ SFD 6/8/2012 38 Seabed condition survey (if off_ -shore) - - NA - 39 Contact name/phone for weekly progress reports_ [exploratory only] NA. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geologic Engineering Public Grassroots Rotary well.. Targeting zone 2 and 4 Ivishak . GIs Commissioner: Date: Commissioner: Date Commissioner Date 18TH