Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-104
Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-104 6.50-029-20277-04-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12951 9810 8529 9399 none 8179 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 46 - 126 46 - 126 1530 520 Surface 2679 13-3/8" 46 - 2725 46 - 2725 4930 2670 Intermediate 8467 9-5/8" 44 - 8511 44 - 7422 8150 / 6870 5080 / 4760 Liner 1350 7" 8340 - 9690 7284 - 8429 7240 5410 Perforation Depth: Measured depth: 9678 - 12850 feet True vertical depth:8418 - 9061 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 42 - 9523 42 - 8285 9399 8179Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Liner 3430 4-1/2" 9519 - 12949 8282 - 9059 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 76104352 916275 0 28036 205 699 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork David.Bjork@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-4672 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9059 Sundry Number or N/A if C.O. Exempt: n/a No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 Set CIBP Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028311 PBU 02-12D 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations 9810 , 10534 , 11900, 11970 , 12230 By Samantha Carlisle at 9:48 am, Jun 02, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.06.02 08:45:53 -08'00' Stan Golis (880) MGR30JUL2021 SFD 6/16/2021 RBDMS HEW 6/4/2021 , ADL 0028308 DSR-6/2/21 SFD 6/16/2021 ACTIVITYDATE SUMMARY 5/20/2021 ***WELL FLOWING ON ARRIVAL*** (patch tbg / liner) DRIFT w/ 3.70" CENT & 1.75" S-BAILER TO 9,900' SLM (no issues) ***WELL S/I ON DEPARTURE, DSO NOTIFIED TO BOL*** 5/21/2021 ***WELL S/I ON ARRIVAL, DSO NOTIFIED***(set ns cibp) SET TOP OF NOTHERN SOLUTIONS CIBP AT 9810'. CCL TO TOP OF CIBP OFFSET: 12.1'. CCL STOP DEPTH: 9797.9'. LOG CORRELATED TO SLB PLUG AND PERF RECORD DATED 23-MAR-2017. ***WELL LEFT S/I ON DEPARTURE AND TURNED OVER TO DSO*** Daily Report of Well Operations PBU 02-12D STATE OF ALASKA • • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations I3 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate ❑ Alter Casing 0 Change Approved Program �❑/ Plug for Redrill El Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 27/a P L`7 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-104 3. Address: P.O.Box 196612 Anchorage, Development I f Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20277-04-00 7. Property Designation(Lease Number): ADL 0028311 8. Well Name and Number: PRUDHOE BAY UNIT 02-12D 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12951 feet Plugs measured See Attachment feet true vertical 9059 feet Junk measured feet APR 1 3 2017 Effective Depth: measured 10534 feet Packer measured 9399 feet true vertical 8974 feet Packer true vertical 8178.59 feet OG C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"94#H-40 46-126 46-126 1530 520 Surface 2679 13-3/8"72#N-80 46-2725 46-2725 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet I t ii1 tik SCAOW True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 42-9523 42-8285 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 68 26165 4 420 275 Subsequent to operation: 615 19723 14 400 873 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development gzi Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil m Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature � " Phone +1 907 564 4424 Date 4/13/17 3/17 Form 10-404 Revised 5/2015 YTL- l6D / ��C(/(/eP7RBDMS °.!,APR 1 72017 Submit Original Only • • Plugs Attachment PRUDHOE BAY UNIT 02-120 SW Name Date MD Description 02-12D 03/24/2017 10534 4-1/2" WFD CIBP 02-12D 07/11/2014 11900 4-1/2"WFD CIBP 02-12D 05/11/2014 11970 4-1/2"WFD CBP 02-12D 11/06/2013 12230 4-1/2" WFD CIBP • • m Q.o O co O o 0 0 0 0 0 0 nsN t` CO CO CO CO CO CO V O — CO O O O r O Ln Ln p N Lf) 1 V LO V LO L() 00 r` U N O o 0 0 0 0 0 0 0 0 0 I- co co LC) LU N LU N- LU N CO LO C) r c- CO — CO N O 'Cr CO '- V" CO CO CO CO CO CO N- O) CO (fl Ln •ct CD CO CO M N O) CI) LU N- CO V L() CO d" rt 0 MN N N N N N CO N- CO O) M 0 I 1 1 1 1 1 1 1 1 1 1 I- co CO CO •:;1- CD O CD CO CO CCO CCOO N V V •;:t M LO CO N N V N N N N CO N- CO C r O Ln C� co CO Cfl O O E N � MO (� M � N N - N N .4- N N CCO CO 0) 0 - Z Q CO CO �t CCOO O CO N 'ct • ct cO V co CO CO Ln = M N N N N N- CO c) F— W LOLO o O O OM D7 CO 9 c CA Lo 00 0 CxU) (I) 7 000 co co 0 A - N O M c CO , Ln LC) L L N O) c C) 6) C) O )- � V 00 O O O r` N LC) co Ln Ln 0 M N co co M LLO cM- M C) W W W W W W (2 I— I•— I— I— I— I— Q Q Q Q Q CD w 0 0 0 0 0 0 y 0 w W w w w w w La � Q22222 CO U o W X X [tx [tZ Z Q W W W W w W w W p� 0D I— I— Z Z D UUZZZZZZL- � i__ • 0 a) U) m m V- Co cc CO N � <- CO CO 0) CO N F- Ln Cr) Ln Ln O a V' Cf)tCO CO � 0 V coco ) LC) L Ln Lon co 0 ❑ coca) a) O a) a) a) CD CD CD CD o) 00) a) 0 F- a co ~ N Ln CO N- CO N- .- N- V' .- 'CI- L O CO 0) V' CO (`') N- Ln CO CO a CO N cV) Ln CA N- CO 6 4 Ca a) O a) r' Ln Ln Ln Ln Ln Ln Ln Ln In Ln W a V- 0 0 0 0 0 0 0 0 0 0 > 0 Co rn a) a) 0) rn rn a) a) rn a) 0 I- 2 W cc ❑ W WWtiZ a 0m 0QYYo 0 Q m N L CO a) O) a) V- O a) a) a) Ln CD U U W W O. O Ln CO CO V- I 00 .- V' I\ Ln J -J J Q Q (n W N 1..._ N- N- CO 0) 01 0) O O V' CO < < < W a [1 Z G' N da) � CVCVCVN 0C� O J W W -. � � N .- r r 222000 -1 J J ❑ E a °' < < <III I a W o S F— 0 0 0 W ~ ❑ V W W W a Z1- < _I < g Z 2 2 2 O cn Ln c cn cn +-I Q ++ a a } � MM L C0 a) a) O 0 W aa' N N CO a) 0) 0) a0) O N LN }r 07 N N N LN p _ - - -1 = FU- I- a J a t1 .. �� O0) cnv) (1) cn W Q ar CL 0 c QQmmmmmmmmmm 0 a, a) a Y I- CDD 0 0 CD CD O CD CD CD CD CD CD CD W 0 O O N N N N N N N N N N N Z W Z is M CO C'O C O CO CO CO CO CO CO CO O w W W a) ...... -.--- M C.�j C j N N N N N N Z aW 0 0 W W LL_ W 0 M ---.. ...... ...... CSO C) < ❑ J F- J J J ❑ ry CL m ❑ ❑ W J J . O W W < < a- Cn W U LL Cn a [Y ar E Z 0 CV N N CV N N N CV N N N 5. N N N N N N N 1 1 1 1 1L. CL � O W N C C LL 00000000000 CO< < m CO LL iIL � � a Et • • Packers and SSV's Attachment PRUDHOE BAY UNIT 02-12D SW Name Type MD TVD Depscription 02-12D PACKER 8351.21 7292.56 7" Baker HRD-E ZXP LTP 02-12D TBG PACKER 9398.74 8178.59 4-1/2" HES TNT Perm Packer 02-12D PACKER 9530.71 8291.4 5" HRD-E ZXP Packer • • 0 0 > 0 _0 © cl3 co 0 rn N D (o OJ O W II LL _O O0 I- '- d. W O H © O a O a CC) u co O 10 X) CO ZW m O J O EtH 0 HZ H- i II U W C < LC H 1,7,1: ---- .4 0 < 0 W °O MZ d W co II N Er) W 0 0 H >'- , C co 0 M Z a a O Z z0 - N O D _m u) rn N 1,- (.42 0 U J = O W E E 0 a) c z = a) o W o 0- I- 3 >a i_ D �O U ,c w= 0 o0Q � i- 0- „— Zm 0N_ � W O - co F.. a 75 D 2 _ _J om ~ boo ti- o1.) Q L- 0 � Y � OW 2 o - a Q-- --I H * 0 M Ca 4, Eo Cn >J < J W J � pp � (n O J 0 ° W 0. Q � � O II Q E m0. ct U J N o D m o E O o 0 < 5 —U 0 0� O ~ O ct O Qrib2 rn _� ce Q M C) ©Z f- II Z La M -3 --ILLI U] 3 M 2 •M a ZI H- > a V O d > QQ00 CO N p 0H0D � ADO I- '-- (1)= ft-- c\ Z o u o 0 Z C Q M H x O o H I- 0 W H M II H O IZ M Z Ct Z J 2zQWOIDu)1--- 1 - II d ' C0 W --IlN (nIOd = U2 = ~ HOS J ~ 0 J � Co Jlo � Etl~iLUEtCC (9 0 WI..-- JW II D5W II � `•- � � NO _, JJm W0 � O � OCnZ ►— "' Z � -r < 0 a) 0 IO : I- Cn (n . I- W Q` (n o w d Q 5 LL : a” W I- 0 N. N. N- ›- O O I- N N N (A Q N > M In _ CO m ~ M M N 0 co Q TREE= - 4-1/8"5K CNV III 1LHEAD= FMC 02-12D SAFETY NOTES: WELL ANGLE>70°@ 10621' *"* ACTUATOR= ? CHROME TBG&LNR"" PREVIOUS WEL LBOREES NOT INITIAL KB.ELE 56' SHOWN BELOW WHIPSTOCK'** INITIAL BF.ELEV= 1 KOP= 3100' Max Angle= 94°@ 11981' 20"CONDUCTOR -80' , 1988' �—I4-i!2"HES X NP,D=3.813" Datum MD= 10331' 94#,H 40, L 2362' 1--f 95/8"FO CavENTER f Datum TVD= 8800'SS D=19.124' I 2490' H95/8"FO CEMENTER TER I 19-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT I— 2386' I 13-3/8"CSG,72#,N-80 BUTT,ID=12.347" H 2702' GAS LIFT MANDRELS ST HD TVD DEV TYPE VLV LATCH PORT DATE 4 3512 3493 22 MNG DOME RK 16 07/29/14 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD J 3 6028 5492 44 WE SO RI( 20 07/29/14 7793' 1 x 2 7973 6988 37 MNG DMY RK 0 02/04/13 1 9296 8088 28 K8G2 DMY BK-2 0 02/04/13 9 518"BKR GENA WHIPSTOCK(12/27/12) H 8511' ! VI 8342' —9-5/8"X 7"BKR HRD-E ZXPN LIP 19-5/8"CSG,47#,J&L-95 HARD, ID=8.681" IH —8511 I w/it'TIEBACK,D=7.750" 8358' J-19-5/8"X 7"BKR FLEX LOCK HGR,D=6.180" I Minimum lD = 3.725" @9512' 4. 4-1/2" HES XN NIPPLE 9-5/8"Ml LOUT VViVDOW(02-12D)8511 -8528' 9372' H4-1/2"HES X NIP,D=3.813" I 17"LNR,26#,L-80 VAM TOP XO TO L-80 BTGM H 9569' ) �1 C9400' I-17"X 4-1/2"HES TNT PKR D=3.856" I 9436' H4-1/2"/2"HES X NIP,D=3.813" I f TOP OF 4-1/2"LNR I—{ 9519' x 4-1/2"1BG,12.6#,13CR-80 VAM TOP, H 9523' 9517 i--14-1/2"HES XN NP,D=3.725" ' .0152 bpf,D=3.958" 17"LW,26#,L-80 BTC-M,.0383 bpf,D=3.958" H--f 9692' lI\ 9519' H7"X 5"BKR HRD-E ZXPN LTP w/TEBK,D=4.320" I 9525' I--{4-1/2"WLEG,D=4.00" PEFORATION StJIvMARY \ IH ELMD TT NOT LOGGED I REF LOG:SLB CCR/GW MSP GITT/USFT ON 01/12/13 \\ ANGLE AT TOP OF PERF: 30'@ 9678' \ 9542' 1-17"X 5"BKR FLEX LOCK HGR,D=3.87" Note:Refer to Production DV for historical perf data 9551' H7"X 5"XO,D=3.958" SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6' 9678-9708 0 03/23/17 110534'ELM j--14-1/2"WFD OBP(03/23/17) f 2-7/8" 6' '11729-11759 C 11/08/13 gib 2-7/8" 6' "11759- 11789 C 11/08/13 2-7/8" 6' `11809-11839 C 11/07/13 11900' H4-1/2"WFD CUP(07/12114) I 2-7/8" 6' '11914-11944 C 11/07/13 2-7/8" 6' '11959-11989 C 11/07/13 S 2-7/8" 6' *11989-12019 C 11/06/13 f 11949' ,H4-1/2"VVFD CUP(05/10J14) 1 2-7/8" 6' `12019- 12049 C 11/06/13 SO 2-7/8" 6' 12260- 12475 C 02/06/13 2-7/8" 6' 12525- 12850 C 02/06/13 f 12230' ,--14-112"VVFD CUP(11/05113) I *DEPTH SHIFT PER ODE 10/27/14(SEE WELL FILE) ++« f PBTD H I 12858' ♦.♦.. 4-1/2"LNR, 12.6#,13CR-85 VAM TOP, HA. 12949' ;.�. .0152 bpf,D=3.958" DATE REV BY COMMENTS DATE REV BY COMFITS 12/30177 PKR 141 INITIAL COMPLETIONGLVI PRUDHOE BAY UNIT 11/15/95 N3S CTD SIDETRACK(02-12A) PJC T}OF0.TF FS 11/06-11/08/13 4) L: 01 104 06/22/07 N4ES CTD SIDETRACK(02-12B) 10/27/14 MNY/PJC DEPTH SHIFT VVRP 05/10/14 ) PEST No:"50-029-20277-04 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) 03/27/17 BT /JND SET OBP&ADF RFS(03/23/17) SEC 36,T11 N,,RAFI 14E, 804'FNL&894'FWL 02/07/13 PKR 273 SIDETRACK(02-12D) 07/15/14 TA/JMJ SET WFD OBP(07/12/14) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. al a _ 1 0 I+ Well History F' Identifier Organizing (done) wo-sided ❑ Rescan Needed RES N: OVERSIZED: NOTES: C or Items: ❑ Maps: Grayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: OEM Date: ...,,e /s/ MP Project Proofing BY: Date: " ag' `lf, /s/ PIP Scanning Preparation (p x 30 = I '30 + azo = TOTAL PAGES ao(c. BY: 49 Date: 1/4Q,Siiit. (Count does not include cover sheet) /s/ Production Scanning Stage 1 Page Count from Scanned File: _eV) 7 (Count does include cover eet) Page Count Matches Number in Scanning Prep ration: YES NO BY: 41=0 Date: 11/D._,J ` l /s/ Of Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michel Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o 4 •i I • N N • • c c 0 • • • z Z •• L Co o c • O O co O y O o N o Z I \ o • x 0 0 x co p a o) _U 1, w 1 a) 47, vxi oo p 0 a) > => > _ C)) Q O D }I •W 0 .2 p• O N N co o. ,- op. It)0 CU p C CV C`- O O O Ca 0 0 0 E f,9 0 >. - N ld a N U H H C U U Z o O >O 2 O O > Z Z it O <a O IL Z > , O 7 } } co cop C 0 uJ p I- -0 co Co a a :5 to o ° -o m Q Q Q a a� o) a�a °� Q 0 0 O� U >, 0 (A m m 0 LL C LLQ C N r 4) IP • 7d �- O LU LU v D >, 7 O O N mp` m2 N o J m o I. C m O m < o c.-. O U) 2 2 o U) U) o 0 O c « . . m >� 0 0 0 dor foo Z _ 1 p ° c F v w + ai > ui ui hi p p a) o o @ E .)-O ) o E a) ac)2 a 0 > u it it it atn a�n 0 �� 0 o o o w E''o o z E._ ., •c C 'c 'c O uj O w 'c c c rn •'c u CON 0) 0 L L N a) O 3 O O O p 0 O O V O V O U I— J lt) lD >, p 0 U) N_ _a) _o a)15 15 t N W N w _� N y _N y _N p Q 2 E 2 2 0 U D W N W W W N 2 N 2 W W cn W U) W O Z w A 0 U C 'a co M CO Ch M CO Nr a R 1� y j p O O O O O O O O O O O O �a .3 CV N O O -C-‘1- 0 N CV 0 0 0 0 0 v N Wo d - O N N () CO Ce 0 N N �A In M M C� M fh C. (h (h IJJKI C C C C C C V W J 2S a a a a) a m O O 0 O O O O O 0 Z O d t0 O O N N Q16 U) .O+ O O CO CO C00 (00 O O N W 7 la U) O) 0) O CA J o. co Z CL 0 co C Z O1 C r O 0 0 0 C O « O O O O M co 0 0 M N iC O0 y CO I- N CO CO CO 0 N a a) ti E I E V U Ili m p Z `+ c o —I 0 I Q Ntko A 1 Da I- 0 Z 0coo d o • oW� J � U 1 CO N ai m N 0 O 0 N J W O a) 111 p O 01 2 QCL as 0 1 ' ICC a £ DI 0 Z o Q m 0 o1 p o aa)) aa)) a>) g c m m U) U) U) U) > > mcg co Co CO _ CO }a CO CO O E O O O O C C co 0 0 0 c0 c0 p 03 To co 0 0 0 N IZ co U U o U N N �a .@-� To 6 U -.=. .a .6 To �a W ' 2 N 2 a) .O _OI CA O) N a) _m 0I _m _m o p Z O « 0 0 0 0 0 U 0 0 0 0 p p p p 0 0 Tr > I 0 I J ` m a) 1 o) o) O O O O O N N N O0 F F 41 C) cr) d II V CO CO CO CO CO CO CO N N N E 0) 0) rn o) CA o) rn o O O CY) 01 N NN ° Q wW C Z Q N N N N N CO N Ul N N N I ° CEY Ea C) I0) c O • Q u) a 2 CV z I z W g � 2 0 0 U U 0 0 0 0 0 U U 0 0 cv7 J E 0 C! F 0. m 0 w C. p a a p p 0 0 0 0 0 0 0 0 0 0 0 OQ d G H 3 O H 1 W W J W W LU LU LU LU W W W W W O - O O N • • • • • Z• • •• •• •• • • • • rO • L L L n 0 0 0 0 UU U OO • OC CCCOO C C C C C Cu- C • K N NZ Nu_ N to Lou_ int ina `n 5m m0 v) Uu 00 aaa0 a -0 a) aa)— a) .ry a) a) a) a) 0 O) C..) _U a _U U_ U_a _U Q) U_ O 0 N OV) 0-0 0= Z U_ U_ U_ 0_ N T 9 Z rn Z Z Z rn EP Z� Z - a Z •E ° in c'n Z Z 2 Z — -8 O N O a)LL a) a) O m U 00 m LL O N E m m a) m a) 0 LL a) a)(nu_ O O )n (0J coo U) N J N m cn-0 W Cl o O U)0 U)0 m m U) U) U) U) Z y Z a Z Z y Z a' Z O Z a 0 Z Z C C Z Z a Z Z d - o 0 m 0 o) Ou- Oa 0 0 O� O o) Z Ea, 0.o 0 o a sLi- Oo O . OD O m Z Z �a ins ina in u> m <n8i cn J m m cn a cn a cn cn Na U J �a J a 5 > m > rn 5 >LL >P 57L; Q > E > E Q Q > •d) > m > rn > m Q 02 0-0 03 Og 00 0 3 o 0 m ji c 0 ° D ° D D 0� D 0 0� 0 -0 m N O N_O N O N O N< N a) N UJ N U N V N N N O NS N-/ 042 m v e-a a-0 N-0 J I N p N v N p N O N N N v O m 0 (N ) N 0 N N N p (NV N 3 N v O los 0S o� os o._ o_ o m = Ow 0 00 O OW _ ✓ ui ui v`o ai gi 0 ai c ai c ui o @ o 6-0 6-0 6 ai ai v 6-2 ai v OE 0 ? lL LL O LL-O LL-O Ea LL 0 LL m a U) 0 0 11 2 u_2 u_ ll I1 Il 0c a) ll '0 ll 0 ce a U) N U D U W U Q U U- U ... U U g U v U v U U U O U W V O .01W 7 C U 'C Eo 'C U E CLL 'E C E 0 'E 'E 0 'C a) 'C 'C 'C O 'C 'C O 'C (DuJ ` QV) O a) O w O a) O m 0 m 0 O m O W 'op 4'w O m O'0 O-0 O O O a) OU) O m O N 0'4' w • Co /3D N1 0)D NO m m 0 m j aa))> Nw N 0 0 0 0 0 0 0 00 0> W0 ti 0> N W e QQ g w2 di F- w2 w2 EDC1-J ELI w1— cy i wcn ED ELI re w CO w2 al F- CO:E wI— CV a o ,_ s s s o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W N N N N N N N N N N N N N N N r r r r r r C7 f7 ''',s4 (\ f\ f\ f7 f\ C\ Ce 0 M M _- (h (67 -C75 f7 cr s V s s V s s 7 CL W X w Va J1 Z CO N Q a+ m y 0 0) 0 m U) m J Oa m O. u) co C O m 0 IC0 r;, co OcTi N w V 4 0 o N J 0 0 Q a N O II"'' _ ~ Z M 2 ' M N Q N LU m N M UJ O m 1 ' CO 0 Q a 0 m Q c a CI Z U) co m 0 C C {E0 0 0 Z V) CO CO CO CO m m m m y m m m CO CO m CO CO CO Cr) m CO CO CO CO CO m CO v co m m co CO co m m m v 3 m 0 0 0 0 0 0 0 N 0 0 0 0 0 0 0 0 0 om m m m m m m 2 m m To To To m To To m 2 D D D O D D O D O 0 O O O D D D 0 et �'N N N N N N N N O 0 0 o 0 0 0 0 0 O 0 H 'N N N N N N N N N_ N_ N_ N_ N_ N_ N_ N_ N_ N_ N '�� Tr 7 Tr V a Tr 7r a 7 Tr V a a V 7r a a- 'N N N N N N N N N N N N N N N N N N N 0 D• Lo +O^ N U e-. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V E 0 ww WwWWw cn WW wwWWwa 2 ° 0 W cn ° o 0 0 N m.n nre a 0 z >- >- ¢ N 01 U_ a) O L >.1ng la o N c 0) C 0• O �' 1 �\ Z L L O \ 4 v a m Q 2 2 O °` `° N 1 1 U U _I H J VPi z w N E WL1 c E ��ll q+ F- C co E >- " >- co N V CO y ii a) 2 ` p LL CL �0.N ; To co o 0 W/ 0 U) Z ui L� J a it caE /W w 9 y V a J ° n m O E 3 E Z v a� `0 o o o w, H 14 16 W J a C111 J oazi m 0 U a. a um _° Co 775 N o- U U Z o o E M N Q N ® O 11 R N VO. �_ $ E Z _M H ° 5 to cow G = O C M m d p aNi E W m N c o I— E W co 2: ° CO = m to T N c G p c o Q c a g iv m I"'" m c •c °- Qd n o m O Z ° 'm 2 2 E V O p `\ ` J Q m Z C,) Na) $ tr)°' c z N N O O r M Cr) •jp �}\ il N CO 1 ' E �J O H cco o i- NI re 13 N w E a O 3 N N W w H as c E E Oz m m w as 1 m G in N Z F m V p 76 o y N Q o o - Q o a w c c U « O N v m 1 J w y •a d E V O n v ° a a E ° O p — u E 2 o E m E E ¢ a 2 3 i U a a)0 0 0 a c 0 0 o m- 9 0 et I N n N N▪ Z c )- ›- )- co CI WI o) _U 2I M ami w o = } m '--i•• a o a In 0 m c m m c'` rn o a I w Z Z a o 0 F. I con y I- $• U O m Q To (0 '1, COD U G)) `) o I O O H f0�- t U • U a:, '�I w 3 d co V O II,, p co .' W d Z 1 r d ~ ~ N_ + - O o E cn ca) o g aa) o oI''r s aa)C9 cn 2 E } } cm I'mg N 1 o V p ~U - ui v CO N g o r20 D oW0 To Z c j c v 1,, M co M co CO p,li; d co CL Y >,0 0 0 0 0 o Etn E • o @- 'm N N CC?/‘- N N N CO 7 Q ✓ O O N Z a W COa) N' N N M CO CO • N N LO In .- O co LL - a it E K C C C c C c a) N W W a) m a) a) a) C 9 Of rn a) V _ I a a a a a a d E i E m O 000 O O O O O E E z _ _ m y :? cn Q O O- In )n U) co rC O O rn O J a �y 7 la fA N N O) O) co co O E o. O. Z O OI mco 0 U c coo coo N C 2 .r 1 c o o 0 o M (,.) G N Q ca F cn co ao O E o Z N VN U CO al o CSI U) W Wiz° 0 ,� 0 E Q N aO O 0. _3 o. l4 Z cu v O E v M W J 2 U To to t. c N CC O CO W m N O CO N C O 1- E 3 �'=A ILI O a) co c m V/ = p co • c a) c G 0 m ti 0. OCL cu O U N Q c 0. z°I 0 co O z E C7 m -' 13 in U o a) m N m 4 a 2 o to 2! 3 3 3 3 7 7 Z 0 co co u) co TO To a) To la To l0 L l j CO N N 3 ? C c c c OOOO C C C � N N CD CO NNNN r co Z N co% � Oy 0 C ` D U U E Q er m O) O) O W 0 o Fes- E v v c > ( w Ce N Q Z t c m a i N N W E a 0 N Q W C Z N N 0 C.) C C �', H 0 Q as a a) o = ai z 2 cu) E :° E , co E O m N a ZW m p rn I 0 0 15 c °)v 'Q Q a CO Z Q g c Zcat o 0 « v 2 W LL N w Z W 2 U 0 0 p re _2 ) v m J y a) .2. U a) J 0 0. 3 0 d 0. N V 0 oO �oQW T o o ai o aim 0 oR 0 o 1 1 o N O o0 N N I co O Z N m U ' w o in b 'C C k' z F. J z• v_ 7 1 m co 03 1 co coJ 1 tz Ce Q C d O O 7 CL o IX iii J 1 a w W J V a.• O z ti N d 7 a CO I Oco CL c o o N a U N N U o J G N Q N on r a N O In . ~ 5 z fh G = \O N CO m N O a) CO X o Q o. o a l Q ° a z E Clo Zu• V co z c 0 co I v > m o F.a d N No d cc O iir o w N 1 c A U 1 E o, O E E E d a 2 ci 1 0 'w '=4 f� ��: T STATE OF ALASKA ALA' OIL AND GAS CONSERVATION COMMIS' 1 • REPOrd 1 OF SUNDRY WELL OPERATiuNS `" ''' E; ` 2014 1 Operations Abandon CIRepair Wein Plug Perforations 0 Perforate ElOthee1/ YI r Performed. Alter Casing❑ Pull Tubin4 Stimulate-Frac ❑ Waiver Time Extensioi❑ Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Wel] 2 Operator 4.Well Class Before Work. 5.Permit to Drill Number BP Exploration(Alaska),Inc Name DevelopmenQ Exploratory❑ 212-104-0 3 Address P O Box 196612 StratigraphiG Service 6 API Number Anchorage,AK 99519-6612 50-029-20277-04-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028311 PBU 02-12D 9 Logs(List logs and submit electronic and pnnted data per 20AAC25.071) 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 12951 feet Plugs measured See Attachment feet true vertical 9058 67 feet Junk measured None feet Effective Depth measured 11900 feet Packer measured See Attachment feet true vertical 9059 49 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 43-123 43-123 1530 520 Surface 2679 13-3/8"72#N-80 43-2722 43-2721.96 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11729-11759 feet 11759-11789 feet 11809-11839 _feet 11914-11944 feet 11959-11970 feet 11970-11989 feet 11989-12019 feet 12019-12049 feet 12260-12475 feet 12525-12850 feet True Vertical depth 9052.85-9053 96 feet 9053 96-9054 88 feet 9055 47-9056 8 feet 9059.38-9058 23 feet 9057 37-9056.71 feet 9056 71-9055 57 feet 9055 57-9054.34 feet 9054 34-9053 51 feet 9058 11-9058 53 feet 9059 64-9060.9 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 44-9525 44-8286.5 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary. Intervals treated(measured) Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation. 462 38026 27 0 778 Subsequent to operation 0 0 0 0 0 14 Attachments. 15.Well Class after work Copies of Logs and Surveys Run Explorator❑ DevelopmentE Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work. Oil E Gas ❑ WDSP❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C O.Exempt N/A Contact Garry Catron Email Garry.CatronBP.Com Printed Name Garry Catron Title PDC PE Signature Gt4/111- C Phone 564-4424 Date 8/6/2014 �� RBCMS AUG 12 20'3 X114-11 x" Form 10-404 Revised 10/2012 5',(5(lSubmit Onginal Only 02-12D 212-104-0 Plugs Attachement SW Name Date MD Description 02-12D 7/11/2014 11900 4-1/2" WFD CIBP 02-12D 5/11/2014 11970 4-1/2"WFD CBP 02-12D 11/6/2013 12230 4-1/2"WFD CIBP Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 02-12D PACKER 8353 7294.01 7" Baker HRD-E ZXP LTP 02-12D PACKER 9400 8179.66 4-1/2" HES TNT Perm Packer 02-12D PACKER 9531 8291.65 5" HRD-E ZXP Packer CL c)• O O O O O O O O O O O O O e0 N V O v O 00 op (0 CO CO CO N- O v LO LO LO LO O O N- O r` O (O Ln Ln 00 r` CO N- 10 LO LO d- LO N N- 0 -- 11, 00000000000000 I- M N M N M U) LO N- LO N- LO M M 7 LO N O t O ,- 00 — 00 — a d" m N- a W O) W 00 M CO O CO CO V 00 O (fl N- N- CO O M M M V — O) N O M CO CO O7 O LO CO M O N <- (01010 Lf) LO CO O O M CO N N CO O O O O M Ln CO r- N 00 O) O) O) O) N N N N CO N- N M H M r- CO CO O) O) O) O) V V co co LO Ln LO CO O 00 M (0 NI- N N 0 0 0 M LO OO r O O) O O N N N N (O G� N LO O) N- CO CO M V M ,- N Lf) GC M O O O O O 00 M N N O O O) O) CO N M (N (N LO N- ao LO (N LO a7 = N N N N N d7 i i i i I I i i i I i i i i Q M N O) N- 0 0 <- (Ca) V M M V' = 0 0 O O O 00 M M C)N V M LO N N N M V LO CO C co 00 a7 = = = N N N N r- C M r Ln LO O T O 00 O LO LO LO Ln O 00 C? v 000000m M °° Mmm0? 0 •f/) N M N N- " N ' N N- C0* * CC) NN ' cD (OCV C r V �- _ - U N CN CV ao aO b0 co M N N LI) LO Lf) ' O) d1 t '- O (O O O) CO O) "- �O LO 00N LO M LO r- N-C OD CO 0 r- M N N Nr 00 V LN CO OD NM Z Z Z Z Z Z 000000 MHco UUUUUU0 ,„ top DDDDDD < u) U Z w W W W w 0 0 0 0 0 0 m O Z Z Z Z Z crfX1Yc a D J 0 a \ \ 7 $ Q ± * \ ® E ms / I 88 r\ �/ I • 6 d ± \ / $ E . mom — � C RI o e C E N E E _I o e C »/ ® o 5 = q _ \ 03 f / / E cu O. kb / I ON. co / aqg 03) co / \ c\ o u oq / \ 0-f • D = o Q .g = CL / gEo_ 2 \ f > e R Ur % 7 U _% e o o k Lr) g / k \ E 9 o a_(3 U \ 26 / § e o© - U CD # aq 2 D = R O 0 _� * ± / / > ? i / / TREE_ " 4-1/8"5K CNV VUELLHFAD= 132-12() _CHROML &LNR L ANGLE>70°0 10621' _ INITIAL,A,B&C WELLBORES ACTUATOR= ? NT1AL KB.ELE 56' NOT SHOWN BELOW 9-5/8"WHIPSTOCK**" I 1 NTIAL BF.ELEV= KOP= 3100' 1988' -I4-12'HES X NP,D=3.813" Max Angle= 94° 11981' 20"COfeDUCTOR, H 80' I I Datum MD= 10331 94#,H-40, , . -.- L 2362' -195/8"FO CEkENTER x Datum TVD= 00'SS D=19.124' 88 2490' H95/8"FO CEMENTER 9-5/8-CSG,47#,J&L-95-SOFT XO TO N-80 BUTT -I 2386' IL GAS LIFT MANDRELS 13-3/8"CSG,72#,N-80 BUTT,D=12.347" -1 2702' ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3512 3493 22 MMG DMY RK 0 02/14/13 3 6028 5492 44 MMG DMY RK 0 02/14/13 9-5/8'CSG,47#,14-80 BUTT XO TO J&L-95-1-1ARD -I, 7793' I a! X 2 7973 6988 37 Mu1G DMY RK 0 02/04/13 1 9296 8088 28 KBG2 DMY 8K-2 0 02/04/13 9-5/8'BKR GEN 1 VVHPSTOCK(12/27/12) -I 8511' 8342' - 9 518'X 7'BKR F#2D E ZXPN LTP TRACK,D=7.750" 9-5/8'CSG,47#,J&L-95 HARD, D=8.681 H "-8511 ` \ 8358' --I 9-5/8"X 7'BKR FLEX LOCK HGR,D=6.180' Minimum ID =3.725" @ 9512' 9-518'fM_LOUT WN)OW(02-12D)8511'-8528' 4-1/2" HES XN NIPPLE 11---I9372' —14-1/2"HES X NP,D=3.813' I'"LNR,26#,L-80 VAM TOP XO TO L-80 BTC-M -I—9569' 1 Z X 9400' --17".X 4-1/2"HES TNT PKR,D=3.856' TOP OF 4-12'LNR H 9519' I 9436' —I 4-1/2-FSS X NP,D=3.813" x 4-1/2"TBG,12.6#,13CR-80 VAM TOP, -L_9523' 1 , 9512' -14-1/2'HES XN NP,D=3.725• .0152 bpf,D=3.958" 7"LNR,26#,L-80 BTC-M,.0383 bpf,D=3.958' H 9692' 9519' H 7"X 5"BKR F RD-E ZXPN LIP w/TEBK,D=4.320" 4 9526' --� WD 4 112' LEG, =4.00" F�ORATFON SUMMARY -I ELM)TT NOT LOGGED REF LOG:SLB CCR/GR/MSP/GPUSIT ON 01/12/13 \ ANGLE AT TOP OF PERF 88° 11750' 9542' H 7'X 5'BKR FLEX LOCK HGR,D=3.87" Note:Refer to Roduction DV for historical pert data 9551' -17'X 5'XO,D=3.958" SIZE SPF INTERVAL Opn/Sqz SHOT SQZ , 2-7/8" 6' 11750- 11780 0 11/08/13 2-7/8" 6' 11780- 11810 0 11/08/13 2-718" 6' 11830-11860 0 11/07/13 11900' H4-1/2'VVFD CBP(07/12114) 2-7/8" 6' 11935-11965 C 11/07/13 2-7/8" 6' 11980-12010 C 11/07/13El 2-7/8" 6' 12010-12040 C 11/06/13 Lv - B 11970' �4-1/2"WFDCP(05/10/14) 2-7/8" 6' 12040-12070 C 11/06/13 2-7/8" 6' 12260- 12475 C 02/06/13 a 2-7/8" 6' 12525-12850 C 02/06/13 12230' H4-12"VVFD CEP(11/05/13) FBTD —I 12858' t I II 4-12'LNR 12.6#,13CR-85 VAM TOP, -{ 12949' A ! .0152 bpf,D=3.958" DATE REV BY COM ENTS DATE REV BY COM ENTS PRUDHOE BAY UNIT 12/30/77 PKR 141 INITIAL COMPLETION 02/17/14 WETJJMD GLV C/O(02/14/14) WELL 02-12D 11/15/95 N3S CTD SIDETRACK(02-12A) 05/13/14 CRWJMD SET WFD CEP(05/10114) FERMI No: 2121040 06/22/07 N4E5 CTD SIDETRACK(02-12B) 07/15/14 TFA/JMD SET WFD CEP(07/12/14) AR No: 50-029-20277-04 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) SEC 36,T11 N,R14E,804'F P'L&894'FWL 02/07/13 PKR 273 SIDETRACK(02-12D) 11/11/13 JDMJMD SET CEP&ADPHRFS(11/5-8/13) BP Exploration(Alaska) O C) ^I WU' s0 0 0) q? O t9 coLU .FA 1 -I Q-.j "-'i 1tri (V o�� NPr = $.4 ,-. 0 O `(00 al L- U y 1 (' Z o '= W °'�yl W 0d ` o Y. Ts 0 pl .-a ',, 4\ O vi = E-I 0 4- v) v a' m cp to la �' 1. C O ) to va z 0.0 E rn 121 7 U rn Ln ` , ID Lc o a ;y; 0 Q m C/] 1� �i ❑ r r r r r r r ni•- C vl a1 OS OS .-i Q t--4 ,17.0 (.9 0 0_tv co a 16 IZ N 0_ Q t6 G. @ is A a) E O I--I ,.. 5 ~ _, M in M O Nr o in 1� ON >_ u CO a I`-i ,- ,- N .- r N N N I- M _,t, e- X d > Q CY) CO f ,_ u, Ait---p1- „, 0 o 00 0 0 '' Woo Q' ce J Q' cc J W Z Q' Q' J CL a U a X a p Z a a -I Q a Q ce x LL X cc CL C O O O O MO 00 < 000 W W W W p U) W C/) W a Q W W W 2 r2 2 2 J Ct22 W E a m 2 2 2 N 0 E or V~ crO N w N cif) , 7 01 ,D O N I- Iii Z X X X X X X X X X X X X X X p O H 0 e 0 C, 'c - Yk 1� 00 n O M N O co N CO O N M co CO 0 CO O In a- 1` O ,l cc 0 0 0 0 0 0 '- O N O O O 1:11 0 O O G O O O 00 O p O O o o O O W 0 _ cp rum a O W u- >- LL >- O Y 00 N. Ni. LL >. >. CO `t m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O m ai o O "a in C� ^ m m cm cm to V1 Y p () lf) C r-1 C .`_ o• vc Q °' w Q to o th rn ,n d CO a N a, N O m w v v r r l- M N .- 0 r N2 r Y QJ N c��p z co z Z U W cv c4 J c•-) N ?y N Z Z N an u m cu J L7 O - o 0 0 o o v p w t 1-,,-' .. r0 a O u U o Co, 5 ¢ �� X a m cn Q RECEIVED STATE OF ALASKA ALA: )IL AND GAS CONSERVATION COMMISS MAY 2 9 2014 REPORT OF SUNDRY WELL OPERATIONS A 1 Operations Abandon LJ Repair Well Lf Plug Perforations U Perforate U Other✓f G(QCC Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Developments Exploratory ❑ 212-104-0 3 Address P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20277-04-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028311 PBU 02-12D 9 Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 12951 feet Plugs measured See Attachment feet true vertical 9058 67 feet Junk measured None feet Effective Depth measured 11970 feet Packer measured See Attachment feet true vertical 9056 71 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 43-123 43-123 1530 520 Surface 2679 13-3/8"72#N-80 43-2722 43-2721 96 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11729-11759 feet 11759-11789 feet 11809-11839 feet 11914-11944 feet 11959-11970 feet 11970-11989 feet 11989-12019 feet 12019-12049 feet 12260-12475 feet 12525-12850 feet True Vertical depth 9052.85-9053 96 feet 9053 96-9054 88 feet 9055 47-9056 8 feet 9059.38-9058 23 feet 9057 37-9056 71 feet 9056 71-9055 57 feet 9055 57-9054 34 feet 9054 34-9053 51 feet 9058 11-9058 53 feet 9059 64-9060 9 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 44-9525 44-8286 5 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descnptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation: 569 47942 34 0 791 Subsequent to operation: 813 25672 34 0 705 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory❑ Developments Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil U Gas ❑ WDSPL! GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUc4 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt. N/A Contact Garry Catron Email Garrv.CatronaBP.Com Printed Name Garry Catron Title PDC PE Signature �, C47(---., Phone 564-4424 Date 5/28/2014 __ r RBCMS MAY Form 10-404 Revised 10/2012 /A 6�0(/ Submit Original Only J 02-12D 212-104-0 Plugs Attachement SW Name Date MD Description 02-12D 5/11/2014 11970 4-1/2"WFD CBP 02-12D 11/6/2013 12230 4-1/2" WFD CIBP a) Q. O O O O O O 0000000 is V O "CrN C) CO CO CO CO Co CO N- O Ln V Ln LnLOLUOOf- ON- OCOLU 0 Ln CO CO I- LC) LO V LC) 'Cr LO N C".- C) C) 0 C) 0 0 0 0 C) 0 C) 0 0 0 0 Ct N co N CO Ln Ln N- LO N- LC) CO CO Ln N O NY O (0 r- M 0) Ca ti O) CO O) CO CO CO CO CO CO CO V CO O CO 1- CO M N- N- N- N- O) CO CO co O CO N- N CO (3) O) O (3) N O O) 0o CO O) O Ln co co O N O Cr) LC) LO Ln Ln Co O CO CO Co N N co 'Cr C) O O O CO LO 00 V N co CO CA CA O 0) N N N N (0 N- N 1 1 1 1 1 r 1 1 1 1 1 1 1 1 r' V O CO LO N- N- N- N O) CO N- CO CO O O) O) O V CO CO co co co co O CO M CO V N CV O 0 0 CO Ln CO r CO O) O) O) N N N N CO CO N O a) " O co co O) M N1.0 N O O) O O CA CO O a0 co M 00 LO N N CO N N N CO V C Ln CO Ln C) Cr) N N N NV O)f� CO(O N ra i � r M N a7co Ln (o O) co CO co �r- CO O (O CO '- CO 'Cr O O N com 6 N N N N CV N N co C C � J SI- 1- Q in Ln O w O aoo Ln Ln O Ln O co O (b o O co O co 0) rn co o) (b co J co J J J Z Cn Z U) Z d J *kCO *kLU4 4 # 4t % 4t *kN *k •(/) N *k % CO N Cp N N r N- O N po U - - CV - CV OO 00 co O N LC) L o L co to ' N ( r 67 (T O) (A O p) r-� 0)O Ln CO N LO M LO N- CO N CO C CO CO N cr M CO "Cr N CO( O t7' a) CO N Ln O N O J Z Z Z Z Z Z 000000 c O H H H H H w ND D » » > U 0 CCCCCCfYfY0 0 0 0 0 0 u_ Z U Z w w w w w 0 0 0 0 0 0CC m O Z Z Z Z Z e[ fx c e[ 0 0 0 J J J J J 0_ d d 0_ d 0_ U) Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription • 02-12D PACKER 8353 7294.01 7" Baker HRD-E ZXP LTP 02-12D PACKER 9400 8179.66 4-1/2" HES TNT Perm Packer 02-12D PACKER 9531 8291.65 5" HRD-E ZXP Packer a q - \ ^s9 \ 2 [ \ / U / » Cl) N-- 1-DI \ w E \ e\ o / E / - O o p \ \ b 0 / D \ o $ § , 2cs)�_ O , 0 5 E \ / / 2 CL. CO \ \ / � / \ / E 03 < - 2 C _ / 2 e e % 2 CO \ 3 % U_ awl / b2 � \ % 2 I o\ \ / � i / / / E D .\ O 2I 5 % / I �) ii OCD _ I / ƒ \ E \ \ � U \ / / / CO Cl) ce = 3 _ W U) c 2ƒ / $ 0 oo o oE \ k - \ - a2 » / c U ® ® t - .7 ^? $ § CD / ƒ 0 O b § % < 0 $ % b U 0 ' 0- E \ o : ' o E & 2\ / = � \ \ in \ - / 3 _ 2 £ CNA C I : .2 ) / i < t .2 \ k £ CO o \ i 0 E cm o __J « 0 @ a + o L - L 3 % / $ / ± / f .E t CI \ 0 0 2r2 ^\ O oo / F/ O 0) 0 1"---7 m 2 \ w n Q < / / 9 0) mEe ¥ / � / k \ \ Ce \ / 1.0 / � � � � \ / -Q >� w » m N- [ $ / U 00- o % 4 C § _ q N- w % rX w 4 2 4 a 4 m o 1 CO D1 > ƒ C > / 0 / _ - 0 > ƒ / / 92 I- \ / 0o .S / \ / / in ± \ f / \ \ m 3 ƒ E/ G F-, 0 - I m C w O E \ ± a t w © _'- E E \ / ƒ \ / 2 $ / S » a i c y / _ = e m = _o c / g o m o 2 / / / / H / D 7 § I \ / / / \ / E2 _.9 O ± U : U o 2 m 2 c m : U o 2 # L s rY : # t \ \ \ ( CO N- » * 6 TREE= 4-118'5KCNV V1IELLHEAD= FMC 02-1213 SAFETY S:CH ME 1 DC7&LNR L INITIAL,A,&C1OWELLBORES ACTUATOR= IITIAL KB,ELE 56' 1 1...... NOT SHOWN BROW 9-5/8"WHIPSTOCK'"' UT1AL BF.ELEV= KOP= 3100' 1988' H4-1/2"HES X NP,D=3.813" IIAax Angle= 94"@ 11981' 20'CONDUCTOR, 80' 1 1 Datum MD= 10331' 94#,H-40, — 2362' H95/8'FO CaUfre Datum TVD= 8800'SS D=19.124' 2490' H 95/8"FO C814134TER 9-5/8'CSG,47#,J&L-95-SOFT XO TO N-80 BUTT H 2386' 66 GAS UFT MANDRELS 13-3/8'CSG,72#,N-80 BUTT,D=12.347" H 2702' ST MD TVD DEV TY FE VLV LATCH PORT DATE 4 3512 3493 22 MG DAY RK 0 02/14/13 3 6028 5492 44 MG DMY RK 0 02/14/13 9-5/8'CSG,47#,N-80 BUTT XO TO J&L-95-HARD (— 7793' I =K >< 2 7973 6988 37 WAG D6W RK 0 02/04/13 1 9296 8088 28 KBG2 DAY BK-2 0 02/04/13 9-5/8"BKR GEN 1 WHPSTOCK(12/27/12) H 8511' 8342' —9-5/8"X 7'BKR HRD E ZXPN LTP w/11'TEBACK,D=7.750" 9-5/6'CSG,47#,J&L-95 HARD, D=8.681" H —8511 `V\ $358' —I9-518"X 7"BKR FLEX LOCK HGR,ID=6.180' Minimum ID = 3.725" @ 9512' 9-5/8'MLLOUT WIDOW(02-1213)8511'-8528' 4-112" HES XN NIPPLE I 9372' —I4-1/2"HES X NP,D=3.813' _ 1 1�� 7"L 26#,L-80 VAM TOP NR XO TO L-80 BTC-M 9569' Z X 9400' —17'X4-1/2'HES TNT PKR,D=3.856' TOP OF 4-1/2"LNR 9519' 1 i 4-112"HES X NP,D=3.813' X 4-1/2'TBG,12.6#,13CR-80 VAM TOP, —I 9523' 1 9612' H4-1/2'HES XN NP,D=3.725" .0152 bpf,F)=3.958' 7"LHR,26#,L-80 BTC-M,.0383 bpf,D=3.958" H 9692' 9519' _-17"X 5"BKR F RD-E ZXPN LTP w/TTE BK,D=4.320" 9625' H4-1/2-WLEG,0=4.00" FEFORATION SLIANA RY \ H ELMD TT NOT LOGGED FIEF LOG:SLB CCR/GR/MSP GPM USIT ON 01/12/13 \\ A NGLE AT TCW OF PERF: 88° + 11750 9542' H 7'X 5"BKR FLEX LOCK HGR,D=3.87" Note:Refer to Production DV for historical perf data 9551' 7'X 5'XO,D=3.958' SIZE SW INTERVAL Opn/S<(i SHOT SOZ , 2-7/8" 6' 11750-11780 0 11/08/13 2-7/8' 6' 11780- 11810 0 11/08/13 2-7/8" 6' 11830-11860 0 11/07/13 2-718" 6' 11935•- 11965 0 11/07/13 2-7/8" 6' 11980-12010 C 11/07/13 \� I 11970' —14-1/2-WFDC78P(OS/10/14) 2-7/8' 6' 12010- 12040 C 11/06/13 2-7/8' 6' 12040- 12070 C 11/06/13 2-7/8' 6' 12260- 12475 C 02/06/13 _ 2-7/8' 6' 12525- 12850 C 02/06/13 12230' H4-1/2"WFDCEP(11/05/13) PBTD — 12858' - NC lir 4-1/2'LHR, 12.6#,13CR-85 VAM TOP, —I 12949' ieZ .0152 bpf,D=3.958" DATE Frill/BY COMutENTS DATE REV BY COMMENTS PRIDHOE BAY UNIT 12/30/77 PKR 141 INITIAL COMPLETION 015/28 JGR/PJC FINAL ODEAFPROVAL(02/11/13) WELL: 02-12D 11/15/95 N3S CTD SIDETRACK(02-12A) 11/11/13 JOM'JMD SET CBP&ADPERFS(11/05-08/1; PERMIT No 2121040 06/22/07 114ES CTD SIDETRACK(02-12B) 02/17/14 VVEC/JM)GLV CIO(02/14/14) AR No: 50-029-20277-04 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) 05/13/14 CRR/JMD SET WFD CEP(05/10/14) SEC 36,T11N,R14E,804'FTL&894'FWL 02/07/13 PKR 273 SIDETRACK(02-12D) 02/07/13 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) RECEIVED �2t APR 03 2014 244 1Z° AOGCC Schlumberger Transmittal#: 6827 Drilling&Measurements DATA LOGGED MWD/LWD Log Product Delivery / /2014 M K BENDER Customer BP Exploration Alaska Inc Dispatched To: Makana Bender Well No 02-12D Date Dispatched: 3-Apr-14 Installation/Rig Parker 273 Dispatched By: Stephanie Pacillo Data Description Hardcopy Digital Copy S-1106 Color Log Prints 4 VISION*Service 2"MD 1 each Contents on CD VISION*Service 2"TVD 1 each Contents on CD VISION*Service 5"MD 1 each Contents on CD VISION*Service 5"TVD 1 each Contents on CD LAS Digital Data VISION*Service Memory Data Contents on CD Surveys 1 ASP Final Survey 1 each Contents on CD EOW CD 1 Received By: Please sign and return one copy to: UUU Drilling&Measurements 2525 Gambell Street,Suite 400 Anchorage,Alaska 99503 hechetoslb.com Hector Echeto Fax:907-561-8317 .. a\Z`Z`{ 21-1 ( Z° EEE APR 0 3 7014 AOGCC op DS02-12D Survey Geodetic Report Schlumberger (Def Survey) Report Date January 31 2013-10 28 AM Survey I DLS Computation- Minimum Curvature I Lubmslu Client BP Vertical Section Azimuth 140 011•(True North) Field Prudhoe Bay Unit-EOA Vertical Section Origin 0 000 0 0 000 8 Structure 1 Slot DS-02/02-12 TVD Reference Datum RKB Well 02-12 TVD Reference Elevation 75 88011 above MSL Borehole 02-120 Seabed I Ground Elevation 30 000 6 above MSL APM 500292027704 Magnetic Declination, 20 712• Survey Nemo 02-120 Total Gravity Field Strength. 1001 9037m9n(9 80665 Basad) Suety Dots January 27.2013 Total Magnetic Field Strength 57633 319 nT Tort/AHD 1 Dol 1 ERD Ratio 258 772•/6861 978 It/6 404/0 757 Magnetic Dip Angle 81 024• Coordinate Reference System NAD27 Alssle Slate Plans Zone 04 US Feel Declination Date January 04 2013 Location Lal l Long N 70.16 9 55813',W 148.28 56 51130' Magnetic Declination Model BGGM 2012 Location Grid NIE SIX N 5950398 270 SUS E 687641 510 ItUS North Reference True North CRS Grid Convergence Angle. 1 4285• Grid Convergence Heed 0 0000• Grid Scale Factor 0 99994 Total Corr Mag North.>True North 20 7120• Local Coord Referenced To Well Head Commenb MD Incl Azim True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Eating Latitude Longitude tet PI 1.1 (ft) (61 161 fret 161 181 (SI i 0 004th IItU51 In651 PI 19 Protected-Up 000 0 00 0 00 -75 88 000 0 00 0 00 0 00 0 00 0 00 N/A 5950308 27 687641 51 70 26932170 -148 48244758 KBE 1988 000 000 -5600 1988 000 000 000 0DO 000 000 595039827 687641 51 70 26932170 -14848244758 WRP 45 88 0 00 0 00 -3000 45 88 0 00 0 00 0 00 0 00 0 00 0 00 5050308 27 687841 51 70 26032170 -148 48244758 50 00 0 33 301 92 -25 68 50 00 -0 01 0 01 0 01 0 01 -0 01 8 01 5950398 28 687641 50 70 26932172 -148 48244766 150 00 0 08 45 69 74 12 150 00 -0 29 0 31 0 29 0 21 -0 20 0 36 5950398 47 687641 30 70 26932227 -148 48244924 250 00 0 07 114 39 174 12 250 00 -0 24 043 0 25 0 23 -0 10 0 09 5950398 50 687541 41 70 26932233 -148 45244838 350 00 0 16 162 89 274 12 350 00 -0 06 0 62 0 07 0 07 0 00 0 13 5950398 34 687641 51 70 26932190 -146 48244760 450 00 0 36 167 51 374 12 450 00 0 35 1 07 0 38 -0 37 0 11 0 20 5950397 90 687641 63 70 26932070 -146 48244672 550 00 0 26 106 06 474 12 550 00 0 82 1 56 064 -0 74 0 39 0 33 5950397 54 687641 92 70 26931969 -148 46244441 850 00 0 08 12 57 574 12 650 00 0 96 1 82 096 -0 73 0 63 0 28 5950397 55 687642 15 70 26931970 -148 48244252 750 00 0 07 264 31 674 12 750 00 0 89 1 91 089 -0 67 0 58 0 12 5950397 61 587642 11 70 26931987 -148 48244288 850 00 0 17 154 32 774 12 650 00 1 00 2 07 1 00 -0 61 0 58 0 20 5950397 47 687642 11 70 26931949 -146 48244286 950 00 0 33 90 04 874 12 950 00 1 36 248 1 36 -0 99 0 93 0 27 5950397 30 857642 47 70 26931899 -148 48244004 1050 00 0 47 107 81 974 11 1049 99 1 93 3 18 1 99 -1 17 1 61 0 15 5950397 14 687643 15 70 26931852 -148 48243459 1150 00 0 57 127 66 1074 11 1149 99 2 76 4 08 2 88 -1 60 2 39 0 21 5950396 73 687643 94 70 26931735 -146 48242824 1250 00 0 64 140 26 1174 10 1249 08 3 60 5 13 3 91 -2 33 3 14 0 15 5950396 02 687644 71 70 26931534 -148 48242217 1350 00 0 62 143 64 127410 1349 98 4 90 6 23 4 98 -3 19 3 82 0 04 5950395 17 687645 41 70 26931295 -148 48241669 1450 00 0 36 137 01 1374 09 1449 97 5 76 7 08 5 82 -3 86 4 36 0 27 5950394 52 687645 96 70 26931116 -148 48241237 1550 00 0 36 126 54 1474 09 1549 97 6 38 7 71 6 44 -4 28 4 52 0 07 5950394 12 687646 44 70 26931002 -148 45240659 1650 00 0 32 118 79 1574 09 1649 97 6 04 5 30 7 03 -4 60 5 32 0 06 5950393 81 687646 94 70 26930914 -148 45240457 1750 00 0 17 106 16 1674 09 1749 97 7 32 8 73 7 44 -4 77 5 71 0 16 5950393 64 587647 33 70 26930566 -146 45240144 1850 00 0 20 107 81 1774 09 1849 97 760 9 05 7 74 J 87 6 02 0 03 5950303 55 687647 64 70 26930840 -148 46239695 1950 00 0 23 111 59 1874 09 1949 97 7 D2 9 43 8 09 -5 00 6 37 0 03 5050303 44 687648 OD 70 26930606 -146 45239609 2050 00 0 21 107 35 1974 09 2049 97 8 25 9 61 5 46 -5 12 6 73 0 03 5950393 32 687648 36 70 26930771 -148 45239317 2150 00 0 12 99 48 2074 09 2149 97 545 10 10 6 72 -5 20 7 01 009 5950393 25 687648 84 70 26930751 -146 45239092 2250 00 0 12 121 63 2174 09 2249 97 886 10 30 692 -5 27 7 20 0 05 5950393 18 687648 84 70 26930731 -148 45235936 2350 00 0 17 166 08 2274 09 2349 97 859 10 54 9 14 -5 47 7 32 0 12 5950392 99 687648 96 70 26930677 -148 46236840 2450 00 0 10 150 29 2374 09 2449 97 9 11 10 78 9 33 -5 69 7 39 008 5950392 77 687649 04 70 26930616 -148 48238780 2550 00 0 11 161 10 2474 09 2549 97 9 29 10 96 9 49 -5 66 7 47 0 02 5950392 60 687649 12 70 26930571 -148 46238720 2650 00 0 19 190 38 2574 09 2649 97 946 11 22 9 65 .6 11 7 47 0 11 5950392 35 687849 13 70 26930501 -148 46238719 13-344•Csg 274076 0 23 187 24 2664 84 2740 72 0 74 11 55 0 87 -0 44 7 48 0 10 5050302 02 687640 15 70 20030412 -148 48238708 2750 00 0 24 185 43 2674 08 2749 96 9 713 11 59 9 90 -6 48 7 49 0 10 5950391 125 687649 16 70 26930401 -148 45235700 2850 00 1 08 193 20 2774 08 2849 96 10 53 12 72 10 56 -7 60 7 33 0 67 5950390 56 687849 03 70 26930095 -148 48238832 2950 00 4 01 167 66 2573 97 2949 85 13 45 1716 13 70 -11 98 6 65 294 5950386 46 687648 45 70 28928898 -148 46239383 3000 00 6 10 146 45 2923 79 2999 67 17 27 21 39 17 77 -15123 768 8 11 5950382 54 687649 79 70 26927819 -148 48238383 3025 00 7 47 147 53 2948 61 3024 49 20 20 24 34 20 71 -18 41 9 49 550 5950380 11 687651 46 70 26927142 -148 46237084 3050 00 8 84 148 62 2973 36 3049 24 23 71 27 89 24 24 -21 42 11 36 5 51 5050377 14 687653 40 70 26926319 -148 48235570 3075 00 10 03 152 02 2998 02 3073 90 27 74 31 95 28 34 -24 08 13 39 5 25 5950373 63 687655 51 7D 26925346 -148 48233935 3100 00 11 32 154 98 3022 59 3098 47 32 24 36 61 32 97 -29 13 15 44 5 61 5950359 54 687657 67 70 26924213 -146 46232270 Drilling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02\02-12\02-12D\02-12D 2/20/2013 438 PM Page 1 of 8 CommentsMD Incl Alm Omura TVDSS TVD VSEC AHD wura NS EW DLS Northing ELatitudelln9Latitude Longitude IM P1 19 IM (ft) 110 (8) It11 (ft) IN 7)166111 NOM HIM i9 in 3125 00 12 89 154 81 3047 03 3122 91 3731 41 86 38 20 -33 87 17 67 6 28 5950364 85 687660 02 70 26922916 -146 46230472 3150 00 14 16 153 20 3071 34 3147 22 4298 47 70 44 05 -39 13 20 23 5 31 5950359 66 887662 71 70 26921461 -116 46228399 3175 00 14 15 144 73 3095 58 3171 48 48 98 53 81 50 16 -44 47 23 20 4 37 5950354 40 687665 81 70 26920022 -148 48226001 3200 00 13 34 142 82 3119 86 3195 74 54 86 59 75 58 05 -49 38 26 53 6 48 5950349 57 887669 26 70 26918661 -148 46223309 3225 00 12 69 135 70 3144 22 3220 10 60 50 65 37 61 55 -53 64 30 19 8 92 5950345 40 887673 02 70 26917516 -148 48220349 3250 00 13 22 127 92 3168 59 3244 47 66 03 70 97 66 87 -57 36 34 36 7 29 5950341 78 687877 29 70 26916499 -148 48216975 327500 14 24 125 02 3192 87 3268 75 71 80 76 90 72 36 -80 89 3913 4 92 5950338 38 687682 15 70 26915537 -148 48213115 3300 00 15 48 125 23 3217 04 3292 92 7799 83 31 78 35 -64 58 4438 196 5950334 83 887687 48 70 26914529 -146 48206675 332500 1672 12440 321105 331803 8468 9024 8487 -6853 5007 504 5950331 01 66769327 7026913.8 -148.204272 3350 00 17 58 124 34 3264 94 3310 82 91 78 97 62 91 86 -72 69 56 15 344 5950327 00 687699 46 70 26912311 -148 48199352 337500 18 49 124 51 32118 71 3364 50 99 24 105 36 99 25 -77 07 62 54 3 65 5050322 79 687705 95 70 26911116 -148 48194190 3400 00 19 04 124 70 3312 39 3368 27 106 99 113 40 106 99 -81 64 69 16 2 21 5950318 39 687712 68 70 26909868 -148 48188838 3425 00 19 87 125 29 3335 96 3411 84 115 03 121 72 115 06 -86 41 7598 3 41 5950313 78 687719 61 70 26908563 -148 46163323 3450 00 20 43 125 92 3359 43 3435 31 123 37 130 34 123 47 -91 43 82 08 210 5950308 95 687728 74 70 26907193 -148 481 77661 3475 00 21 13 126 51 3382 80 3158 68 131 99 139 21 132 17 -96 67 90 14 2 92 5950303 89 687734 02 70 26905761 -146 48171876 3500 00 21 75 127 31 3406 07 3481 95 140 89 148 34 141 18 -102 16 97 44 2 74 5950298 58 687741 46 70 26904282 -118 48165968 3525 00 22 19 127 58 3429 26 3505 14 150 02 157 70 150 42 -10784 10187 1 81 5950293 08 687749 03 70 26902708 -146 48159961 3550 00 22 81 127 77 3452 35 3528 23 159 36 167 26 159 90 -113 69 112 44 250 5950287 43 687756 74 70 26901111 -148 48153842 3575 00 23 47 127 82 3475 34 3551 22 168 97 177 09 169 84 -119 71 120 20 264 5050281 BO 687764 65 70 26899466 -146 48147564 3600 00 24 14 127 86 3198 21 3574 09 178 83 187 18 179 66 -125 90 128 17 265 5950275 61 667772 77 70 26897775 -148 48111121 3625 00 24 70 128 08 3520 98 3596 86 188 94 197 51 189 94 -132 26 136 32 2 26 5950269/6 687781 08 70 26898038 -146 48134532 3650 00 25 16 128 12 3543 65 3619 53 199 25 268 05 200 42 -138 78 144 61 1 84 5050263 17 687789 53 70 26894262 -148 48127826 867500 25 80 128 37 3566 21 3612 09 209 78 218 81 211 13 -115 42 153 07 2 71 5950256 72 687798 14 70 26892442 -148 48120993 3700 00 2618 129 00 3568 68 3664 56 220 53 22D]] 222 OS -152 27 161 62 1 78 5950250 08 887806 87 70 26890570 -14818114075 372500 26 75 129 06 3811 08 3686 94 231 47 240 92 233 17 -159 29 170 28 2 28 5050243 20 887815 69 70 26868653 -148 48107077 3750 00 27 36 129 29 3633 33 3709 21 242 64 252 29 244 51 -166 47 179 09 248 5950236 33 687524 68 70 26886691 -144 46099950 3775 00 27 64 129 55 3655 50 3731 38 253 98 263 83 256 04 -173 80 188 01 1 22 5950229 22 687833 78 70 26684086 -148 46092739 3800 00 28 28 120 89 3677 56 3753 46 265 52 275 55 267 74 -181 29 197 02 2 64 5950221 96 687642 98 70 26882642 -148 48085450 3825 00 28 71 129 91 3699 55 3775 43 277 26 287 46 279 86 -188 94 206 17 1 72 5950214 51 687852 32 70 26866552 -146 46078052 3850 00 29 32 130 08 3721 42 3797 30 289 20 299 60 291 77 -196 74 21546 246 5950206 98 687861 80 70 26878422 -148 48070540 3675 00 29 90 130 30 3743 15 3819 03 301 37 311 96 304 11 -204 71 224 90 2 36 5950109 24 687871 43 70 268762/5 -148 48062911 3900 CO 30 17 130 38 3764 80 3840 60 313 71 324 47 316 62 -212 81 231. 1 09 5950191 39 687881 18 70 2687/032 -148 48055199 3925 00 30 65 130 56 3766 36 3662 21 326 18 337 12 329 27 -221 02 244 06 1 95 5950163 41 867800 09 70 28871788 -14818047415 3950 00 31 07 130 61 3607 62 3883 70 338 84 349 95 342 09 -229 36 253 80 1 68 5950175 32 687000 91 70 26669508 -148 46039541 3975 00 31 46 130 94 382919 3905 07 351 64 362 92 355 06 -237 84 263 63 1 70 5950167 09 687910 97 70 26867193 -148 45031597 4000 00 31 89 130 99 3850 46 3928 34 364 61 376 05 368 18 -246 44 273 54 1 72 5950155 74 657921 09 70 26864842 -148 48023582 4025 00 32 55 131 13 3871 61 3947 49 377 77 389 38 381 51 -255 20 283 59 266 5950180 23 687931 38 70 26862450 -14818015456 4050 00 33 21 131 43 3892 61 3968 49 391 19 402 95 395 08 -264 15 293 79 2 72 5950141 54 687941 78 70 26860004 -148 45007210 4075 00 33 86 131 69 3913 45 3989 33 404 85 416 76 408 89 -273 32 304 12 266 5950132 64 687952 33 70 26857500 -148 47998554 4100 00 34 37 132 02 3934 14 4010 02 418 73 430 78 122 91 -282 67 311 57 2 17 5950123 54 687963 01 70 26854944 -148 47990410 4125 00 34 84 132 46 3954 72 4030 60 432 80 444 98 437 11 -292 22 325 08 2 13 595011127 687973 75 70 26852337 -148 47981912 4150 00 35 43 132 51 397517 4051 05 447 06 459 37 451 50 -301 93 33569 2 36 5950104 82 687954 60 70 26649662 -146 47973333 417500 3612 13272 399545 407133 46155 47398 46611 -31163 34644 280 595000519 68709580 7026846978 -14817984637 4200 00 36 45 132 83 401560 4091 44 476 23 488 78 460 91 -321 86 357 30 1 35 5950085 42 688006 70 70 26844233 -146 47955857 422500 37 09 133 26 4035 63 4111 51 491 08 503 74 495 87 -332 00 388 24 2 76 5050075 48 688017 89 70 26841443 -148 47947014 4250 00 36 90 133 32 4055 59 4131 47 501302 518 79 510 91 -34211 379 19 0 77 5950065/4 655029 09 70 26638624 -148 47938181 427500 37 04 133 26 4075 57 4151 45 520 96 533 82 525 94 -352 72 390 13 058 5950055 41 688040 29 70 26835808 -148 47929313 4300 00 38 99 133 34 4095 53 4171 41 535 90 548 87 540 99 -363 04 401 09 0 28 5950045 38 688051 50 70 26832988 -148 47920457 432500 36 74 133 10 4115 53 4191 41 550 80 563 87 555 98 -373 32 412 01 1 06 5950035 36 668062 67 70 28830179 -148 47911626 4350 00 38 69 133 22 4135 57 1211 15 565 64 578 82 570 93 -383 55 422 90 0 21 5950025 40 688073 82 70 26827384 -148 47902818 4375 00 36 77 133 26 4155 61 4231 49 580 49 593 77 585 88 -393 70 433 79 0 33 5950015 44 688084 96 70 26824565 -145 47891012 4400 00 36 76 133 30 4175 63 4251 51 595 35 608 73 800 84 -404 05 444 69 0 10 5950005 45 688096 10 70 26821783 -145 47885205 4425 00 37 00 133 31 4195 63 4271 51 610 25 623 74 615 64 -414 34 455 61 096 5040995 44 888107 28 70 26818971 -148 47876377 4450 00 36 94 133 19 4215 61 4291 49 625 18 638 77 830 87 -424 64 466 56 0 38 5949985 41 888118 48 70 26816157 -148 47567523 4475 00 37 36 133 39 4235 53 4311 41 640 17 653 87 645 97 -435 00 477 55 1 75 5949975 31 688129 72 70 26813328 -148 47858638 1.500 00 37 07 133 23 4255 44 4331 32 655 19 668 99 661 08 -445 37 488 55 1 22 5940965 25 688140 96 70 26810495 -148 47849743 4525 00 37 26 133 17 4275 36 4351 24 1370 18 684 09 676 19 -455 71 499 56 0 77 5949955 19 668152 21 70 26807670 -145 47840842 4550 00 37 32 133 17 4295 25 4371 13 655 22 699 24 601 33 -486 07 510 81 0 24 5949945 10 888183 51 70 26804839 -148 47831911 4575 00 37 37 133 22 4315 13 4391 01 700 28 714 40 706 49 -476 45 521 66 0 23 5949935 00 888174 85 70 26802003 -118 47822972 4800 00 37 60 133 15 4334 97 4410 85 715 39 729 62 721 71 -456 86 532 75 094 5949924 87 868186 20 70 26799158 -148 47814004 Dolling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02/02-12\02-12D\02-12D 2/20/2013 438 PM Page 2 of 8 4. Commend MD Incl MinTrue TVDSS TVD VSEC AHD Closure NS EW DLS Nordling Eulln9 Latitude Longitude NO (1 CI (86 UI (N IRI Int IRI IRI ('110086 (MIST (SUSI (1 (1 4625 00 37 45 133 18 4354 79 4430 67 730 51 71184 736 93 -197 28 543 86 060 5949914 73 666197 56 70 26796312 -146 47805024 4650 00 37 35 133 07 4374 65 4450 53 745 58 760 03 752 12 -507 86 55494 0 48 5949904 63 666208 90 70 26793476 -146 47796064 4675 00 37 60 133 15 4394 49 4470 37 76066 775 24 767 33 -518 05 566 05 1 02 5949894 52 688220 26 70 26790636 -148 47787086 4700 00 37 61 133 12 4414 30 4490 18 775 83 700 50 762 59 -528 49 577 18 0 18 5949884 37 686231 65 70 26787785 -148 47778083 4725 00 37 72 133 19 4434 08 4509 96 791 00 805 78 797 87 -538 94 586 33 0 36 5949874 20 688243 06 70 26734930 -148 47769070 4750 00 37 58 133 26 4453 88 4529 76 806 17 821 05 813 14 -549 40 599 46 0 59 5949864 02 688254 44 70 26782072 -146 47780074 4775 00 37 93 133 13 4473 64 4549 52 821 37 836 36 828 44 -559 87 610 62 1 44 5949853 83 688265 86 70 26779210 -148 47751052 4800 00 38 13 133 26 4493 33 4569 21 636 66 851 76 843 84 -570 42 621 65 088 5949843 56 668277 34 70 26776329 -146 47741975 1825 00 38 04 133 12 4513 01 4580 89 851 98 86715 859 26 -581 00 633 08 050 5949833 26 668288 82 70 26773437 -148 47732909 4650 00 37 92 133 45 4532 72 4608 60 867 26 682 57 874 64 -591 56 644 23 0 49 5949622 97 666300 25 70 26770547 -146 47723878 1875 00 38 22 133 43 4552 40 4628 28 682 57 897 98 690 06 -*02 18 655 42 1 20 5949812 65 66E311 70 70 26767651 -148 47714828 4900 00 38 25 133 50 4572 04 1647 92 897 95 913 45 905 53 -*12 83 666 85 0 21 5949802 29 666323 10 70 26764743 -146 47705750 4925 00 38 26 133 58 4591 67 4667 55 913 33 928 93 921 01 -623 19 677 87 0 20 5949791 91 668334 67 70 26761829 -148 47696678 4950 00 3847 133 69 4811 27 4687 15 928 75 944 45 936 52 -634 20 689 10 068 5949781 49 668316 17 70 26758904 -148 47687599 4975 00 38 52 133 87 4630 84 4706 72 944 22 960 01 952 08 -841 96 700 34 0 49 5949771 01 688357 67 70 26755962 -148 47678516 5000 00 39 00 134 16 4650 33 4726 21 959 78 975 66 967 72 -655 84 711 59 2 05 5949760 42 688369 19 70 26752991 -148 47669/16 5025 DO 39 12 134 34 4669 74 4745 62 975 48 991 41 983 47 -666 83 722 88 066 5949749 71 688380 74 70 26749987 -148 47660293 5050 00 39 32 134 47 4689 11 4761 99 091 19 1007 22 999 27 -677 80 734 17 086 5049738 93 688392 31 70 26748965 -148/7651164 5075 00 39 44 134 40 4708 43 4784 31 1006 97 1023 05 1015 13 -689 00 745 50 0 51 5949728 11 688403 91 70 267/3931 -148 47642007 5100 00 39 39 134 15 4727 75 4803 63 1022 77 1038 96 1030 99 -700 08 756 66 0 67 5949717 32 688415 51 70 26740904 -148 47632819 5125 DO 39 55 134 21 4747 05 4522 93 1038 58 1054 85 1046 88 -711 15 768 26 066 5949706 53 688427 21 70 26737878 -148 47623606 5150 00 39 78 134 21 4766 29 4542 17 1054 45 1070 81 1062 83 -722 28 779 70 0 92 5949695 70 688438 92 70 2673/838 -148 4761/359 517500 39 61 134 35 4785 53 4861 41 1070 34 1086 77 1078 80 -733 43 791 13 0 77 5949664 84 666450 63 70 26731792 -145 47605117 5200 00 39 92 134 55 4504 75 4880 63 1086 26 1102 77 1094 78 -744 63 802 55 1 34 5949673 93 688462 32 70 26728732 -148 47595868 522500 39 77 13462 4823 94 4899 82 1102 20 1118 78 1110 79 -755 87 813 95 063 5949662 97 66847400 70 26725660 -14847586666 5250 00 39 99 134 95 4543 12 4919 00 1118 17 1134 81 1126 81 -767 16 825 33 1 22 5949651 97 665485 66 70 26722575 -148 47577468 5275 00 40 23 134 92 4862 24 4938 12 1131 21 1150 92 1142 91 -778 54 836 73 096 5949610 88 666497 34 70 26719467 -146 47566251 5300 00 40 40 135 11 4881 31 4957 19 1150 32 1167 09 1159 07 -789 98 848 17 084 5949629 73 688509 05 70 28718341 -148 47559007 5325 00 40 66 135 18 1900 31 4976 19 1166 51 1183 34 1175 31 -801 49 859 62 1 06 5949615 50 666520 79 70 26713194 -148 47549744 5350 00 41 01 135 29 4910 22 4995 10 1182 80 1199 69 1191 64 4113 10 871 14 1 43 5949807 19 688532 59 70 26710023 -148 47540438 5375 00 41 21 135 39 1938 06 5013 94 1199 18 1218 12 1208 07 -824 79 882 69 0 84 5949595 79 668514/3 70 26706828 -148 47531097 5400 00 41 30 135 45 4956 85 5032 73 1215 61 1232 61 1224 51 -836 54 894 26 0 39 5949584 34 688556 29 70 26703620 -146 47521743 5125 00 41 27 135 61 1975 64 5051 52 1232 06 1249 10 1241 02 -848 31 905 82 0 44 5919572 88 658568 14 70 26700404 -148 47512401 5450 00 41 51 135 70 4994 40 5070 28 1248 54 1265 63 1257 53 -860 13 917 37 0 99 5949561 33 688579 98 70 26897174 -148 47503081 5475 00 41 82 135 72 5013 07 5055 95 1265 11 1282 25 127414 -872 02 926 95 1 21 5949549 73 688591 56 70 26693924 -118 47493680 5500 00 12 18 135 81 5031 85 5107 53 1281 80 1298 98 1290 85 -884 01 940 65 1 46 5949538 04 688603 84 70 28690649 -145 47484246 5525 00 42 29 135 95 5050 16 5126 04 1298 56 1315 79 1307 63 -896 07 052 34 0 58 5949526 27 688815 84 70 26887353 -14847474789 5550 00 42 37 135 99 5055 64 5144 52 1315 35 1332 62 1324 45 -008 18 964 04 0 34 5949514 46 688627 83 70 26684046 -118 47465330 5575 00 42 51 138 05 5087 09 5182 97 1332 18 134949 1341 30 -920 32 975 78 058 5949502 62 688639 85 70 26680729 -148 47/55860 5600 00 43 16 136 09 5105 42 5181 30 1349 14 1366 49 1358 28 -932 56 987 55 260 5949490 68 688651 94 70 26677384 -145 474/6327 5625 00 13 04 136 21 5123 68 5199 56 1366 18 1363 57 1375 34 -94188 999 39 058 5949478 66 658664 08 70 26674019 -145 47436761 5650 00 42 89 136 20 5141 97 5217 85 1383 18 1400 61 1392 38 -957 15 1011 18 060 5949466 66 688676 17 70 26670658 -145 47427228 5675 00 43 51 136 02 5160 19 5236 07 1400 26 1417 73 140916 -969 51 1023 05 2 65 594945162 688685 34 70 28687287 -148 47417635 5700 00 12 84 136 19 5178 42 5251 30 1417 33 1434 84 1426 55 -951 64 1034 91 2 84 5949442 59 686700 51 70 26663919 -146 47408045 5725 00 43 52 136 05 5196 65 5272 53 1434 40 1451 95 1443 64 -994 17 1048 77 2 75 5949430 56 668712 67 70 26660549 -148 47393459 5750 00 43 91 136 09 5214 72 5290 60 1451 63 1469 22 1460 90 -1006 61 1055 75 1 56 5949418 42 68872496 70 26657150 -145 47388770 5775 00 43 79 136 15 5232 75 5308 63 1168 91 1486 54 1478 20 -1019 10 1070 76 0 51 5949406 24 688737 27 70 26853739 -148 47379065 580000 43 50 136 12 5250 84 5326 72 145613 1503 80 1495 44 -1031 54 1082 72 1 16 5949394 11 668749 54 70 26650340 -146 47369400 5825 00 43 30 136 27 5269 00 5344 88 1503 27 1520 97 1512 60 -1043 94 1094 61 090 5949382 01 688761 73 70 26846953 -148 47359786 5850 00 43 26 136 31 5287 20 5363 08 1520 37 153811 1529 72 -1056 32 1106 45 0 19 5949389 92 688773 88 70 26643568 -148 47350215 5875 00 13 33 136 35 5305 40 5381 28 1537 48 1555 26 1546 85 -1088 72 1118 29 0 30 5949357 82 686786 02 70 26640179 -146 47340645 5900 00 43 41 136 59 5323 57 5399 45 1554 61 1572 42 1564 00 -1081 17 1130 11 0 73 5949345 67 66879815 70 26636778 -146 47331087 5925 00 43 77 136 93 5341 68 5417 56 1571 82 1589 66 1581 21 -1093 73 1111 92 1 72 5949333 41 688810 27 70 26633347 -148 47321542 5950 00 43 37 136 99 5359 79 5435 67 1589 03 1806 89 1598 41 -1108 32 1153 66 1 61 5949321 12 688822 34 70 26629906 -148 47312036 5975 00 43 61 136 08 5377 03 5453 81 1606 21 1624 10 1615 59 -1118 90 1165 42 096 5949308 84 68883438 70 28628469 -148 47302545 6000 00 43 41 137 07 5396 06 5471 91 1623 40 1641 31 1632 78 -1131 50 1177 15 0 72 5949296 54 688816 43 70 26623027 -148 47293061 6025 00 43 53 137 12 5414 20 5190 08 1640 59 1858 52 1649 98 -1144 10 1188 87 0 39 5949201 23 688858 45 70 26619584 -148 47283593 6050 00 43 70 137 07 5432 30 5508 18 1657 81 1675 76 166718 -1156 73 1200 61 069 5949271 90 688870 50 70 26616133 -148 47274103 6075 00 4342 137 13 545011 5526 29 1675 02 1692 90 1654 35 -1169 35 1212 33 1 13 5949259 57 668882 54 70 26812884 -148/7264624 6100 00 43 47 137 24 5465 56 5544 44 1592 19 1710 18 1701 55 -1781 96 1224 02 0 36 5949247 26 666894 53 70 26609239 -148/7255179 Drilling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02\02-12/02-12D/02-12D 2/20/2013 438 PM Page 3 of 8 • • Comments ND Incl Atlm Tru. TVDSS TVD VSEC AHD Cloeur• NS EW DLS Northing Emoting Latitude Longitude (Ml 1'( In (10 (84 (S) (It) Iftl 1111 (f0 1'110010 (6916) (#954 (1 el 6125 00 43 49 137 33 5486 70 5562 58 1709 37 1727 39 1718 72 -1194 60 123569 0 26 5049234 01 688906 51 70 26605785 -148 47245747 6150 00 43 21 137 48 5504 88 5580 76 1726 51 1744 55 1735 85 -1207 24 1247 30 1 19 5949222 58 688018 44 70 26802333 -148 47236358 6175 00 43 24 137 61 5523 10 5598 98 1743 62 1761 67 1752 94 -1219 87 1258 86 0 38 5949210 24 888930 31 70 26598882 -148 47227016 6200 00 43 46 137 77 5541 26 5617 16 1760 77 1778 83 1770 07 -1232 56 1270 41 098 5949197 84 688942 17 70 26595414 -148 47217678 6225 00 43 37 137 76 5559 44 5635 32 177793 1796 01 1787 22 -1245 28 1281 96 0 36 5949185 41 688954 03 70 28591938 -148 47208343 6250 00 43 28 137 94 5577 63 5653 51 1795 08 1813 17 1804 34 -1258 00 1293 47 0 61 5949172 98 688985 86 70 26588463 -148 47199038 6275 00 42 76 138 02 5595 90 5671 78 1812 12 1830 22 1821 36 -1270 67 130469 2 09 5949160 60 668977 59 70 26585001 -148 47189810 6300 00 42 70 138 05 5614 27 5690 15 1829 07 1847 19 1838 28 -1283 28 1316 23 0 25 5949146 28 666989 24 70 26581555 -148 47180641 6325 00 42 52 136 05 5632 67 5708 55 184599 1864 11 1855 17 -1295 87 1327 55 0 72 5949135 97 689000 86 70 26578115 -148 47171496 6350 00 42 56 138 31 5651 09 5726 97 186288 1881 01 1872 04 -1308 47 1336 82 0 72 5949123 06 689012 44 70 26574673 -148 47162386 6375 00 42 34 138 36 5669 53 5745 41 1879 75 1897 89 1888 87 -1321 08 1350 03 090 5949111 34 689023 97 70 26571229 -148 47153321 6400 00 42 26 138 55 5888 02 5763 90 1896 57 1914 71 1905 65 -1333 57 1361 19 056 5949099 03 660035 44 70 26567787 -148 47144303 6425 00 42 39 138 78 5706 51 5782 39 191340 1931 55 1922 44 -1346 31 1372 31 0 81 5949086 67 689046 86 70 26584334 -148 47135317 6450 00 42 15 138 97 5725 01 5800 89 1930 21 1948 36 1939 20 -1358 98 1383 36 1 09 5949074 28 689058 24 70 26560873 -148 47126378 6475 00 42 30 139 13 5743 52 5819 40 1947 01 1965 16 1955 95 -1371 67 1394 38 0 74 5949061 87 669069 56 70 26557405 -148 47117477 6500 00 42 16 139 24 5762 03 5837 91 1963 81 1981 96 1972 70 -1384 38 1405 36 063 5949049 44 689080 85 70 26553931 -148 47108600 6525 00 41 99 139 41 5780 59 5656 47 1980 56 1998 72 1989 40 -1397 09 1416 28 0 82 5949037 01 689092 09 70 26550459 -148 47090775 6550 00 41 81 139 30 5799 20 5875 08 1997 26 2015 41 2006 04 -1409 76 1427 15 0 78 5949024 62 889103 27 70 26546996 -148 47090985 6575 00 41 54 139 36 5817 87 5893 75 201388 2032 04 2022 60 -1422 36 143799 1 09 5949012 28 689114 42 70 26543553 -148 47082229 6600 00 41 50 139 31 5836 59 5912 47 2030 45 2048 51 2039 12 -1434 93 1448 78 0 21 5946999 99 689125 52 70 26540118 -148 47073501 6625 00 41 37 139 35 5855 33 5931 21 2046 99 2065 15 2055 61 -1447 48 1459 57 053 5948987 71 689136 62 70 26536889 -148 47064786 6650 00 41 26 139 26 5874 11 5949 99 2063 50 2081 66 2072 07 -1460 00 1470 33 050 5948975 47 689147 68 70 26533270 -148 47058068 6675 00 40 95 139 16 5892 95 5968 63 2079 03 2098 09 2088 45 -1472 44 1481 07 1 27 5948963 30 689158 73 70 26529870 -148 47047409 6700 00 40 74 139 25 5911 86 5987 74 2096 28 2114 44 2104 76 -1484 82 1491 75 0 87 5948951 10 689169 72 70 26528488 -146 47036775 6725 00 40 49 139 32 5930 83 6006 71 2112 55 2130 72 2120 98 1497 15 1502 36 1 02 5948939 12 889180 63 70 26523117 -148 47030195 6750 00 40 51 139 41 5949 85 6025 73 2128 79 2146 95 2137 17 -1509 45 151294 0 25 5948927 07 689191 51 70 26519751 -148 47021649 6775 00 40 09 139 47 5988 91 6044 79 2144 96 2163 12 2153 29 -1521 76 1523 45 169 5948915 05 689202 33 70 26516394 -148 47013151 6800 00 39 89 139 68 5988 07 6063 95 2161 02 2179 19 2169 30 -1533 99 1533 87 0 97 5948903 09 689213 05 70 26513052 -148 47004730 6625 00 40 07 139 76 6007 22 6063 10 2177 08 2195 25 2185 31 -1546 24 1544 26 0 75 5948891 10 689223 73 70 26509704 -146 46996337 6650 00 39 96 139 76 5026 37 6102 25 2193 16 2211 33 2201 33 -1558 51 1554 61 044 5948879 09 689234 42 70 25506351 -148 4698790 6875 00 39 74 139 76 6045 56 6121 44 220918 2227 35 2217 30 -1570 74 1564 90 068 5948867 12 689245 07 70 26503010 -148 0979580 6900 00 39 24 139 87 6064 86 6140 74 2225 08 2243 25 2233 15 -1582 89 1575 25 2 02 5948655 24 869255 63 70 26499691 -148 46971289 692500 39 57 139 86 6084 17 8180 05 2240 95 2259 12 2248 96 -1595 02 1585 46 1 32 5946643 36 689266 16 70 26496376 -148 46953021 6950 00 39 14 140 01 6103 50 6179 38 2258 80 2274 97 2264 76 -1607 15 1595 68 1 76 5946831 49 669276 68 70 26493061 -148 46954774 6975 00 39 53 140 05 6122 84 6198 72 2272 65 2290 81 2280 55 -1819 30 1805 86 1 56 5946819 61 669267 14 70 26469742 -148 46946547 7000 00 39 43 140 18 6142 14 6218 02 2286 54 2306 71 2296 39 -1531 50 1616 05 0 52 5946807 87 689297 63 70 26486409 -148 46938309 702500 39 00 140 16 6161 51 6237 39 2304 35 2322 52 2312 14 -1643 63 1626 18 1 72 5948795 79 889308 05 70 26463093 -148 46930127 7050 00 36 56 140 18 6180 95 6256 83 2320 06 2338 22 2327 79 -1655 70 1636 24 056 5948763 98 689318 41 70 26479797 -148 48921995 7075 00 38 42 140 13 6200 48 6276 36 2335 67 2353 84 2343 35 -1667 68 1548 24 1 76 5948772 25 669328 71 70 26476522 -148 46913911 7100 00 38 39 140 22 6220 07 6295 95 2351 20 2369 37 2358 82 -1679 61 1656 19 0 25 5948760 57 889338 95 70 26473262 -148 46905872 7125 00 38 58 140 19 6239 54 6315 52 2366 75 2364 92 2374 33 -1591 56 1666 14 0 76 5948748 87 689349 20 70 26469996 -148 46897824 7150 00 38 03 140 25 6259 26 6335 14 2382 25 2400 42 2389 77 -1703 47 1676 06 2 21 5948737 21 689359 41 70 26466742 -148 46889811 7175 00 37 99 140 31 5276 96 6354 84 239764 2415 81 2405 11 -1715 31 1685 90 0 22 5048725 62 680369 54 70 26483507 -148 48681860 7200 00 37 88 140 33 6299 67 6374 55 2413 01 2431 18 2420 43 -1727 14 1695 71 044 5948714 04 669379 64 70 26480275 -148 46873929 7225 00 37 79 140 30 6316 42 5304 30 2428 35 2446 52 2435 71 -1738 94 1705 50 0 37 5948702 49 689389 72 70 26457050 -148 46886015 7250 00 37 58 140 31 6338 20 6414 08 244363 2461 80 2450 94 1750 70 1715 26 084 5948690 98 689399 78 70 26453637 -146 46858126 7275 00 37 SO 140 20 6357 99 6133 87 2458 92 2477 09 2466 17 1762 46 1725 04 0 92 5948679 47 669409 84 70 26450625 -146 46850228 7300 00 37 71 140 16 6377 75 6453 63 2474 22 2492 30 2481 43 -1774 21 1734 84 0 37 5948667 96 689419 93 70 26447413 -148 46842306 7325 00 37 74 140 19 5397 53 6173 41 2469 52 2507 69 2496 68 -1785 96 1744 64 0 14 5948656 46 889430 02 70 26444203 -145 46634369 7350 00 37 62 140 19 5417 31 6493 19 2504 80 2522 97 2511 91 -1797 70 1754 42 048 5948644 97 689440 09 70 26440995 -145 0526482 7375 00 37 55 140 18 6437 12 6513 00 2520 05 2538 22 2527 12 -1809 41 1764 15 0 25 5948633 51 669450 14 70 26437795 -148 46818591 7400 00 37 63 140 22 6456 93 8532 81 2535 30 2553 47 2542 32 -1821 13 1773 94 0 33 5948622 04 689480 19 70 26434593 -148 48810702 7425 00 37 75 140 21 6476 72 6552 60 2550 56 2568 75 2557 56 -1832 87 1783 73 048 5948610 54 689470 26 70 26431354 -145 46602797 7450 00 37 67 140 43 6496 49 8572 37 256568 2584 05 2572 80 -1844 64 1793 49 063 5948599 02 689480 31 70 26428168 -148 48704906 7475 00 37 39 140 27 6516 32 6592 20 2581 10 2599 28 2587 98 -1858 37 1803 21 1 10 5946587 54 689490 32 70 26424964 -145 46787053 7500 00 37 40 140 29 653615 5612 06 2596 29 2614 45 2503 12 -1868 05 1812 91 0 06 5948576 11 689500 31 70 26421773 -145 46770212 7525 00 37 48 140 32 6556 03 6631 91 2611 48 2629 66 2518 27 -1879 74 1822 62 0 33 5048564 86 889510 31 70 28418578 -146 45771367 7550 00 37 60 140 46 6575 85 6651 73 2626 72 260 89 2633 48 -1891 48 1532 33 050 5948553 17 689520 31 70 26415371 -148 46763518 7575 00 37 66 140 41 6595 65 6671 53 2641 98 2660 15 2645 68 -1903 24 1842 05 0 27 5948541 65 669530 32 70 26412156 -148 45755661 7600 00 37 47 140 53 6615 47 5691 35 2657 22 2675 40 2653 57 -1915 00 1851 75 0 81 5948530 14 689540 31 70 26408943 -148 46747821 Dulling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02102-12\02-120\02-12D 2/20/2013 4 38 PM Page 4 of 8 • CommentsMD Incl /aim True TVDSS TVD VSEC ANO Closure NS EW DLS Northing Emoting Latitude Longitude (8) (1 (1 (81 (84 (68) (8) MI (8) Iltl (110668) (865) (ttUSI (1 (') 625 00 37 54 140 60 6635 30 6711 18 2672 44 2600 82 2679 04 -11926 76 1861 41 045 5048518 83 889550 26 70 26105729 -14646740015 650 00 37 52 140 56 665513 6731 01 2687 87 2705 85 2694 22 -1938 54 1871 07 0 33 5948507 10 686560 21 70 26402512 -146 46732207 675 00 37 58 140 77 6674 95 6750 53 2702 91 2721 08 2709 41 -1950 32 len 73 0 57 5948495 56 689570 18 70 26399292 -146 46724403 700 00 37 36 140 71 6694 70 6770 87 2716 11 2730 29 2724 57 -1962 10 1890 35 0 59 5948484 03 689560 07 70 26396074 -146 46716625 72500 37 34 140 73 6714 66 6790 54 2733 28 2751 46 2739 68 -1973 84 1599 96 009 5948172 53 889569 98 70 26392866 -14546705865 750 00 37 36 140 74 6734 54 6810 42 274e 41 2786 62 2754 60 -1965 56 1909 56 0 08 5948461 03 689599 85 70 28359658 -11516701107 775 00 37 33 140 79 6751 41 6530 29 2763 81 2781 79 2769 92 -1997 33 1919 15 0 17 5948449 53 689509 73 70 26386448 -145 46693355 800 00 37 40 141 02 6774 28 6850 16 2778 76 2796 96 2785 04 -2009 10 1928 72 0 62 5948438 00 689619 59 70 26383230 -146 46055623 82500 37 35 141 17 6794 15 6870 03 2793 95 2812 14 2500 16 -2020 91 1938 25 0 42 5945426 43 889829 41 70 26360004 -11618877921 850 00 37 37 141 04 6814 02 6859 90 2809 12 2827 31 2815 27 -2032 72 1947 77 0 33 5948414 86 689639 23 70 26376777 -145 46670224 875 00 37 36 141 35 6833 89 6909 77 2824 29 2842 48 2830 39 -2044 54 1957 28 0 75 59415403 28 880640 03 70 26373546 -148 46862540 900 00 36 97 141 57 6853 el 6929 69 2839 39 2857 56 2645 43 -2056 35 1966 69 1 65 5946391 71 689658 73 70 26370319 -144 46654938 925 00 36 93 141 53 6873 79 6949 67 2854 41 2872 61 2860 39 -2068 12 1978 04 0 19 5948380 18 689668 36 70 26367103 -148 46647364 950 00 36 66 141 74 6893 79 6969 67 2669 41 2887 62 2875 31 -2070 59 1985 35 056 5946348 65 889877 97 70 26363867 -148 46839856 975 00 36 78 141 76 6913 80 6959 68 2884 39 2902 60 2590 25 -2091 66 1994 63 0 32 5945357 11 689657 53 70 26360672 -148 46632361 000 00 36 76 141 76 6933 82 7009 70 2509 35 2917 57 2905 15 -2103 41 2003 89 0 08 5945345 60 689697 09 70 26357460 -148 16624875 025 00 36 71 141 73 6953 86 7029 74 2014 29 2932 52 2920 04 -2115 15 2013 15 0 21 5948334 09 689706 63 70 26354252 -148 46617394 050 00 36 52 141 76 6973 93 7049 81 2020 20 294743 293489 -2128 86 2022 38 0 76 5948322 61 680716 15 70 26351052 -148 46609933 075 00 36 69 142 09 6994 00 7069 65 2944 10 2962 34 2949 73 2138 60 2031 57 1 04 5945311 11 689725 64 70 26347846 -148 46602504 100 00 38 51 141 97 7014 07 7089 95 2958 99 2977 24 2984 56 -2150 35 2040 74 0 77 5948299 60 689735 10 70 26344635 -148 46595094 125 00 36 38 141 92 7034 18 7110 06 2973 83 2992 10 2979 35 -2162 04 204990 053 5948288 13 68974/54 70 26341439 -148 46557696 150 00 36 38 142 28 7054 30 7130 18 2088 65 3006 92 2994 11 -2173 74 2059 01 0 81 5948276 67 880753 04 70 26338242 -148 46550334 175 00 36 36 142 39 7074 43 7150 31 3003 47 3021 75 3008 86 2185 47 2068 07 0 32 5948265 16 689763 29 70 26335036 -148/6573012 200 00 36 22 142 38 7094 59 7170 47 3018 25 3036 55 3023 58 -2197 19 2077 10 056 5948253 67 689772 61 70 26331534 -148 46565712 225 00 36 13 142 33 7114 77 7190 65 3032 99 3051 30 3038 28 -2208 88 2086 12 0 37 5948242 22 689781 01 70 26328842 -148 46558428 250 00 3615 112 35 7134 95 7210 83 3047 73 3066 05 3052 93 -2220 55 2095 13 0 09 5048230 78 689791 21 70 26325452 -148 46551149 275 00 36 22 112 43 7155 13 7231 01 3062 47 3080 81 3067 62 -2232 24 2104 13 0 34 5946219 31 689800 50 70 26322257 -14816543870 300 00 36 10 142 40 7175 32 7251 20 3077 21 3095 56 3062 30 -2243 93 2113 13 0 49 5948207 85 680809 79 70 26319063 -148 48536600 325 00 36 19 112 44 7195 51 7271 39 3091 94 3110 30 3096 97 -2255 62 2122 12 0 37 5046196 39 689819 07 70 26315570 -148 46529333 350 00 36 04 142 34 7215 70 7291 58 3106 67 3125 04 3111 63 -2267 29 2131 12 064 5846184 95 689625 35 70 26312650 -148 48522066 375 00 35 72 112 26 7235 96 7311 84 3121 31 3139 69 3126 22 -2276 58 2140 08 1 29 5945173 58 649837 60 70 26309512 -148 46514426 400 00 35 85 112 40 7256 24 7332 12 3135 91 3154 31 3140 77 -2290 45 2149 01 0 61 5048162 24 689848 82 70 26306350 -148 46507607 425 00 35 67 142 40 7276 52 7352 40 3150 51 3164 92 3155 31 -2302 03 2157 92 0 72 5946150 89 689856 01 70 26303187 -148 48500404 450 00 3565 142 54 7298 83 7372 71 3185 06 3183 50 3169 82 -2313 59 2166 81 0 33 5946139 55 689865 18 70 26300028 -140 46493227 475 00 35 62 142 42 7317 15 7393 03 3179 63 8106 07 3164 32 -232515 2175 68 0 37 59415128 22 6801574 34 70 26296870 -148 48488057 Tie-1n Survey 500 00 36 16 141 50 7337 40 7413 28 3194 28 3212 72 3198 92 -2336 89 2184 71 3 05 5945116 91 689883 66 70 26293718 -148 46478759 Top Whipalock 511 00 36 26 140 85 7346 28 7422 16 3200 78 3210 22 3205 40 -2311 75 2188 70 3 03 5948111 05 480887 85 70 26292333 -148 46475466 525 00 36 40 140 02 7357 56 7433 44 3209 07 3227 52 3213 65 -2348 15 2194 07 363 5946105 69 689693 30 70 26290556 -148 46471197 043.Whipslock 528 00 36 35 13D 70 7350 07 7435 85 3210 85 3220 30 3215 46 -2340 51 2105 22 6 52 5948104 38 680804 48 70 23290214 -148 46470270 550 00 36 04 137 33 7377 73 7453 61 3223 84 3242 29 3228 44 2359 24 2203 82 6 52 5948094 85 689903 32 70 26287555 -148 46463317 575 00 35 84 13129 7397 97 7473 85 3238 47 3256 96 3243 11 -2369 76 2214 04 7 18 5948084 59 689913 80 70 26284650 -148 46455055 8600 00 35 80 131 64 7418 23 7494 11 3253 00 3271 60 3257 72 -2379 74 2224 76 6 21 5948074 85 689924 76 70 26281953 -148 46440395 8025 00 35 75 130 29 7438 50 7514 38 3267 45 3288 23 3272 27 -2389 33 2235 81 3 21 5945065 56 6150936 05 70 26279331 -118 48437468 8650 00 35 80 129 94 7458 78 7534 66 3251 85 3300 85 3256 78 -2395 75 2246 99 0 84 5944456 43 689947 45 70 26276758 -148 46428435 8675 00 35 84 129 53 7479 06 7554 94 3296 24 3315 45 3301 30 -2408 10 2258 24 0 97 5948047 36 689958 93 70 26274202 -11816419342 8700 00 35 25 127 16 749910 7575 28 3310 47 3330 01 3315 67 -2417 12 2269 63 599 5944438 63 860970 55 70 26271737 -148 46410133 872500 31 55 123 66 7519 90 7595 78 3324 31 3344 31 3329 69 -2425 40 2251 28 848 5946030 64 659952 40 70 26269472 -148 46/00717 8750 00 34 20 121 40 7540 54 7616 42 3337 77 3358 43 3343 37 -2432 99 2293 18 5 29 5945023 35 669994 49 70 26267395 -148 16391102 8775 00 3120 120 71 7561 22 7637 10 3351 06 3372 48 3356 91 -2440 24 2305 22 1 55 594801840 600006 70 70 26265415 -148 48381373 8500 00 3422 120 50 7581 89 7657 77 336432 3386 53 3370 42 -2447 40 2317 32 046 5948009 55 690018 97 70 26263460 -148 46371596 8825 00 34 02 120 23 7602 59 7678 17 3377 53 3400 56 3383 89 -2454 49 2329 42 1 00 5918002 76 690031 24 70 26261523 -14816361817 8550 00 34 01 120 18 7623 31 7699 19 3390 68 341454 3397 31 -2441 52 2341 50 0 12 5947996 03 690043 50 70 26259600 -148 46352049 8875 00 33 74 120 15 7644 07 7719 95 3403 79 3428 48 3410 69 -2468 53 2353 55 1 08 5947989 33 690055 72 70 26257655 -148 46342312 8000 00 32 29 120 37 7865 03 7740 91 3416 61 3442 10 3423 78 -2475 39 2365 32 5 32 5847982 77 600067 65 70 26255810 -148 48332804 8925 00 30 14 120 56 7686 41 7762 29 3428 82 3455 05 3436 25 -2481 96 237648 8 61 59/7076/8 690078 98 70 26254014 -148 46323778 8950 00 29 46 120 85 7708 10 7763 98 3440 54 3467 48 3448 21 -2488 28 2357 18 2 73 5947970 42 600089 62 70 26252265 -148/8315136 8975 00 29 35 120 50 7729 86 7805 76 3452 11 3479 75 3460 03 -2494 53 2397 74 0 53 5847964 44 690100 54 70 26250578 -148 48308595 9000 00 29 12 120 47 7751 70 7827 58 3463 62 3491 96 3471 79 -2500 72 2408 27 0 92 5047958 51 690111 22 70 26248656 -148 46298092 9025 00 28 79 120 09 7773 57 7819 45 3475 01 3504 07 3483 44 -250682 2418 72 1 51 5847952 67 600121 52 70 26247217 -146 46280645 9050 00 28 15 119 73 7795 55 7871 43 3456 21 3515 98 3494 89 -2512 77 2129 05 2 65 5947946 99 690132 29 70 26245593 -11446241297 Drilling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02\02-12\02-12D\02-12D 2/20/2013 438 PM Page 5 of 8 • Comments MD Incl Palm True T1/058 TIM VSEC AHD Closure NS EW DLS Northing Eating Latitude Longitude (ft) II In 1111 151 181 (86 181 I111 Ott 1.1100111 (11US) MS) PI el 9075 00 27 65 110 34 7517 64 7803 52 3497 16 3527 68 350611 -2510 53 2439 23 2 13 5947941 48 800142 61 70 26244017 -148 46273071 9100 00 27 36 119 13 7839 82 7915 70 3507 96 3539 23 351717 -2524 17 2449 30 1 22 5947938 09 890152 82 70 26242475 -144 46264929 9125 00 26 89 119 04 7882 07 7937 95 3518 81 3550 63 3528 09 -2529 71 2459 26 1 89 5947930 80 690162 92 70 28240961 -148 46256579 9150 00 28 54 118 89 7884 40 7960 28 3529 10 3561 130 3538 05 -253516 2469 09 1 43 5947025 61 890172 88 70 26239473 -148 46248932 9175 00 27 38 118 80 7906 68 7982 56 3539 68 3573 20 3549 69 -2540 62 2479 02 3 36 5947920 39 690182 94 70 28237975 -146 46240908 9200 00 28 91 119 01 7928 72 8004 60 3550 67 3584 99 3560 98 -2546 32 2489 35 6 13 5947914 95 890193 40 70 28238420 -148 46232568 9225 00 29 19 119 08 7950 58 8026 46 3562 00 3597 13 3572 62 -2552 22 2499 96 1 13 5947909 32 690204 16 70 26234809 -145 46223989 9250 00 28 91 118 93 7972 43 8048 31 3573 33 3609 27 3564 25 -2558 10 2510 57 1 16 5947903 70 800214 92 70 26233200 -145 46215409 927500 28 75 118 74 7994 33 8070 21 3584 58 3621 32 3505 50 -2563 92 2521 14 0 74 5947898 15 600225 62 70 28231610 -148 46208874 9300 00 28 20 118 63 8016 30 8092 18 3595 69 3633 26 3607 23 -2559 85 2531 61 1 85 5947802 89 690236 23 70 26230044 -145 46198411 932500 27 85 118 33 8038 36 8114 24 380664 3645 02 3618 49 -2575 26 2541 95 1 85 5947887 34 690246 70 70 26228511 -148 46190055 9350 00 28 14 118 11 8060 44 8138 32 3617 53 3856 76 3629 70 -2560 81 2552 29 1 23 5947882 05 690257 18 70 26228904 -1 M 4618180 937500 29 99 118 47 8082 29 8158 17 3628 82 3660 90 3641 32 -2558 56 2562 93 743 5947876 56 690268 01 70 26225420 -148 46173056 9400 00 31 38 11911 8103 79 8179 67 3640 71 3681 88 3653 55 -2592 71 2574 16 5 71 5947870 70 600279 34 70 26223740 -148 46164021 942500 31 67 119 41 8125 10 8200 98 3652 93 3694 73 3666 12 -2599 10 2585 56 1 32 5947864 59 690290 00 70 28221994 -148 46154805 9450 00 31 37 119 29 8146 41 8222 29 3665 16 3707 80 3678 70 -2005 50 2596 98 1 23 5947358 47 690302 45 70 26220243 -148 46145598 9475 00 31 22 119 32 8167 77 8243 65 3677 31 3720 79 3691 20 -2611 86 2608 28 0 80 54347852 40 690313 03 70 26218505 -148 48136446 9500 00 31 04 11910 8189 17 8265 05 3689 39 3733 71 3703 63 -2818 17 2619 56 0 85 5947846 38 690325 38 70 26215781 -148 46127329 952500 30 78 11915 8210 62 8286 50 3701 39 3746 56 3715 99 -2624 42 2630 78 1 05 5947840 41 690330 73 70 26215072 -148 48118263 9550 00 30 98 120 06 8232 07 8307 95 3713 42 3759 39 3728 36 -2830 78 2841 94 2 03 5947834 35 690348 04 70 26213339 -148 46109248 957500 31 29 121 03 8253 47 8329 35 3725 80 3772 31 3740 89 -2637 33 2653 06 2 45 5947828 06 090359 33 70 26211542 -148 48100254 9600 00 31 09 121 02 8274 86 8350 74 3737 85 3785 26 3753 47 -2644 01 2664 16 0 81 5947821 66 690370 58 70 26209717 -148 46091290 9625 00 30 25 121 28 8296 36 8372 24 3749 92 3798 02 3785 87 -2650 61 2675 08 3 25 5947815 33 690381 66 70 26207913 -148 46082466 9650 00 30 19 120 97 831796 8393 84 376103 3810 61 3778 10 -2657 11 2685 85 0 72 54347809 10 690392 80 70 28206134 -148 48073755 967500 30 29 121 02 8339 56 841544 3773 74 3823 20 3790 34 -2663 60 2696 64 0 41 5947802 89 690403 55 70 28204382 -148 48065036 7-Csg 9802 00 30 50 121 01 8354 21 8430 09 3737 3e 3831 81 3798 71 -286104 2704 03 1 76 5047708 63 600411 04 70 26203149 -148 46050070 9705 18 30 82 121 00 8365 55 8441 43 3780 24 3838 54 3805 25 -2671 50 2709 79 1 76 5047795 31 690416 89 70 26202201 -148 46054409 9738 59 33 29 121 50 8392 17 8468 05 3804 03 3855 21 3821 47 -2880 15 2724 04 7 91 5947757 02 890431 35 70 26199837 -148 46042894 9767 00 33 45 124 46 8417 56 6493 44 3820 02 3871 93 3837 85 -2689 26 2738 07 5 38 5947778 27 690445 60 70 28197348 -148 46031555 9802 78 34 00 127 66 8447 32 8523 20 3839 29 3891 79 3857 50 -2700 05 2754 12 5 20 5947766 98 690461 93 70 26194152 -145 460185/37 9829 90 35 56 129 16 8469 60 8545 40 3854 45 3907 27 3872 89 -2710 56 2766 24 663 5947757 67 890474 29 70 26191524 -148 48008792 9860 96 37 58 131 17 8494 54 8570 42 3872 66 3925 78 3891 34 -2722 51 2780 38 750 5947746 09 690488 72 70 26150260 -148 45997368 9592 44 40 19 131 61 8519 04 8594 92 3892 22 3945 54 3911 08 -2735 57 2705 20 8 34 5947733 39 690503 86 70 26181660 -145 45955390 9923 94 41 06 131 22 8542 94 8618 82 3912 50 3966 05 3931 56 -2749 14 2810 59 2 94 5947720 21 690519 58 70 28180980 -148 45972959 9954 66 41 26 131 85 8568 07 0641 95 3932 51 3986 27 3951 76 -2762 55 2825 73 1 47 5947707 19 600535 05 70 281 77315 -148 45960727 9957 25 43 72 132 69 8590 10 8665 98 3954 32 4008 25 3973 78 -2777 36 2842 01 7 75 5917692 70 690551 70 70 261 73268 -148 45947566 10020 32 45 55 132 66 8613 56 8609 44 3977 43 4031 50 3997 05 -2793 15 2859 14 6 53 5947877 43 6990569 21 70 26168952 -14815933726 10050 13 47 75 134 40 8633 96 870984 399902 4053 32 4018 78 -2808 13 2874 90 7 58 5947662 85 690585 34 70 261644860 -146 45920997 10051 81 50 06 13738 8654 79 8730 67 4022 83 4077 19 4042 64 -2525 27 2891 50 10 17 5947646 13 890602 36 70 26160174 -148 45907581 10114 10 51 49 136 50 8675 21 8751 09 4017 81 4102 20 4067 63 -2843 55 2908 58 491 5947628 29 690619 89 70 26155180 -140 45593751 10146 34 52 73 137 26 8605 01 8770 89 4073 21 4127 65 4093 05 -2862 12 2925 97 4 27 5947610 16 690637 74 70 26150101 -14815879731 10177 53 54 19 137 07 871358 8789 46 4098 24 4152 70 4118 07 -2800 49 2943 01 4 71 5947592 21 600655 23 70 26145082 -14815885968 10209 85 55 26 136 21 8732 24 8808 12 4124 58 4179 09 4144 44 -2899 68 2961 12 396 594757319 890673 81 70 26139840 -148 45851329 10241 74 55 53 136 74 8750 35 8826 23 4150 78 4205 34 4170 67 -2918 71 2979 20 1 81 5947554 91 890692 36 70 26134639 -148 45836724 10273 02 55 77 137 81 8768 00 8543 e5 4176 57 4231 16 419647 -2937 65 2996 75 2 42 5947536 42 090710 38 70 26129462 -148 458225/2 10303 81 56 60 138 69 8785 14 8861 02 4202 14 4258 74 4221 99 -2956 70 3013 52 3 97 5947517 80 690727 91 70 26124254 -148 45806754 10336 64 57 72 139 41 8002 94 887e 132 4229 71 4284 33 4249 49 -2977 54 3031 90 388 5947497 42 690746 50 70 26118561 -148 45794149 10365 11 5816 141 33 8019 58 8895 46 4256 43 4311 04 4276 08 -2990 11 3048 93 5 69 5947477 28 890764 04 70 26112938 -148 45780386 10399 74 59 61 143 25 8835 65 0911 73 4283 52 1338 16 4302 93 -3019 57 3085 52 6 35 5947456 24 890781 16 70 26107075 -148 45766957 10430 80 80 44 145 13 8551 37 5927 25 4310 36 4365 06 4329 46 -3041 39 3081 26 588 5947434 83 890797 44 70 26101112 -148 45754272 10462 88 62 36 146 57 8866 72 8942 60 4338 38 4393 21 4357 07 -3064 65 3097 06 7 17 5947411 03 690813 81 70 26094747 -14815711511 1049112 63 62 147 96 8861 05 8956 93 4366 25 4421 33 4384 51 -3088 33 3112 26 560 5947388 87 690829 50 70 26088283 -148 45729232 10525 02 64 56 140 04 8891 77 8970 65 4394 18 4449 57 4411 96 -3112 42 3127 02 4 30 5947364 96 090644 95 70 26081703 -148 45717313 10557 58 65 96 151 25 8908 06 8903 94 4422 57 4478 41 4439 78 -3137 43 3141 37 7 70 5047340 32 890859 92 70 26074867 -148 45705719 1050569 67 02 152 67 8920 28 8996 16 4450 56 4507 03 4467 15 -3162 69 3154 82 7 31 5947315 41 690873 99 70 28067986 -148 45694858 10620 61 70 75 153 00 8831 56 9007 44 4479 87 4536 88 4495 50 -3189 25 3188 45 9 23 5947289 20 990855 28 70 26060709 -148 45683852 10653 58 73 57 154 28 8941 66 9017 54 4510 17 4588 26 4525 37 -3217 36 3182 38 9 32 5947281 43 690902 90 70 28053025 -148 45872602 10682 95 76 00 151 50 8919 36 9025 21 4537 62 4596 60 4552 16 -3212 432 3194 63 0 51 5947236 19 000915 79 70 26046041 -143 45662709 10715 57 76 23 15133 8956 61 9032 49 4563 42 1628 40 1532 25 -3271 80 3208 38 6 87 5917207 58 690930 23 70 2603820/ -14815651619 10717 01 51 13 153 65 8962 25 9038 13 4593 I3 4659 33 1611 60 -329910 3221 92 9 47 5947180 42 89094418 70 26030609 -148 45640666 Dnllin Office 2 6 1166 0 Prudhoe BayUnit-EOA\DS-02\02-12\02-12D102-12D 2/20/2013 438 PMP e 6 of 8 9 a9 CommentsMD Incl Aam Trus TVDSS TVD VSEC AHD Closure NS EW DLS Northing Eating Latitude Longitude (Ni ('1 ('1 (Ni 181 (Ni (M (NI (Ml (Ni (510081 (ttUSI (MS) PI PI 10778 85 84 88 152 20 8966 18 9042 06 4629 23 4890 92 4641 78 -3327 53 3236 30 12 03 5947152 66 690959 56 70 26022923 -148 45629053 10810 59 87 73 152 22 8988 28 9044 16 4660 18 4722 59 4672 16 -3355 54 3251 07 9 61 5947125 02 690975 01 70 26015266 -148 45617130 10842 08 88 88 152 46 8969 21 9045 09 4690 93 4754 07 4702 36 -3383 42 3265 58 3 73 5947097 52 690990 31 70 26007650 -148 45605330 10873 38 91 46 152 95 8969 12 9045 00 4721 46 4785 36 4732 35 -3411 23 3280 03 8 39 5947070 07 691005 35 70 26000050 -148 45593740 10905 00 93 25 153 65 8967 82 9043 70 4752 20 481696 4762 54 -343D 46 3294 23 6 08 5947042 21 691020 25 70 25992338 -148 45582278 1093615 93 34 154 40 8986 03 9041 91 4782 38 4818 05 4792 16 -3467 41 3307 85 2 42 5947014 61 691034 56 70 25984699 -148 45571279 10968 03 92 34 153 68 8964 45 9040 33 4813 27 4879 89 4622 51 -3496 04 3321 79 3 86 5946986 34 891049 21 70 25976876 -148 45560024 10999 28 92 29 153 81 8963 19 9039 07 4843 60 4911 12 4852 33 -3524 04 3335 60 0 45 5946958 69 691063 71 70 25969224 -148 45548871 11032 53 91 80 153 11 8962 00 9037 88 4875 92 4944 35 4884 13 -3553 77 3350 45 2 57 5946929 34 691079 29 70 25981101 -148 45536882 11064 09 90 06 152 23 8961 49 9037 37 4908 70 4975 90 4914 48 3581 80 3364 93 6 18 5946901 68 691094 47 70 25953441 -148 45525183 11095 36 89 83 151 94 8961 52 9037 40 4937 28 5007 17 4944 65 -3609 43 3379 57 1 18 5946874 43 691109 80 70 25945891 -148 45513361 11127 28 89 74 152 01 8961 64 9037 52 4968 49 5039 07 4975 45 -3637 59 3394 56 0 36 5946846 65 691125 48 70 25938196 -148 45501258 11157 70 89 55 152 26 8961 83 9037 71 4998 25 5069 51 5004 84 3661 50 3408 79 1 03 5946820 11 891140 37 70 25930843 -148 45489769 11189 11 89 70 152 12 8962 03 9037 91 5028 95 5100 92 5035 17 -3692 29 3423 44 0 65 5946792 70 691155 72 70 25923251 -146 45477936 11222 12 89 73 152 29 8962 20 9038 08 5061 22 5133 93 5067 05 -3721 49 3438 83 0 52 5946783 89 691171 83 70 25915272 -148 45465507 11252 90 90 08 152 32 8962 25 9038 13 5091 29 5164 71 5096 79 -3748 74 3453 14 1 14 5946737 01 691186 81 70 25907825 -148 45453955 11283 71 66 17 151 11 8962 72 9038 60 5121 46 5195 51 5126 63 -3775 87 3467 74 7 34 5946710 25 891202 06 70 25900412 -148 45442168 11316 19 88 14 151 05 8963 76 9039 64 5153 31 5227 98 5158 18 -3804 28 3483 43 0 21 5946682 24 691218 48 70 25892647 -146 45429491 11348 41 88 42 151 50 8964 73 9040 61 5184 90 5260 18 5189 47 -3832 52 3498 91 1 64 5946654 40 891234 66 70 25884930 -148 45416993 11380 45 89 57 151138 8985 29 9041 17 5216 28 5292 22 5220 56 -3860 70 3514 15 3 63 5946626 61 691250 59 70 25877230 -148 45404686 11391 04 89 80 151 93 8965 35 9041 23 5226 65 5302 81 5230 83 -3870 03 3519 16 3 21 5946617 40 691255 83 70 25874880 -148 45400645 11411 94 89 53 151 66 8965 47 9041 35 5247 11 5323 71 5251 11 -3888 45 3529 04 1 83 5946599 24 691268 16 70 25889647 -148 45392669 11443 57 89 41 152 15 8965 76 9041 64 5278 06 5355 34 5281 79 -3916 35 3543 93 1 59 5946571 72 891281 75 70 25862022 148 45380642 11474 82 87 13 152 97 8966 71 9042 59 5308 54 5386 57 5312 00 -3944 07 3558 32 7 75 5946544 37 691298 82 70 25854448 -148 45389021 11506 26 87 04 152 23 8968 31 9044 19 5339 19 5417 97 5342 39 -3971 D5 3572 77 2 37 5946516 86 691311 98 70 25846630 -148 45357353 11537 53 87 21 152 90 8969 88 9045 76 5369 67 5449 20 5372 62 -3999 67 3587 16 2 21 5946489 51 691327 04 70 25839256 -148 45345735 11588 58 89 27 153 48 8970 83 9046 71 5399 89 5460 23 5402 59 4027 36 3601 16 6 89 5946462 18 691341 72 70 25831687 -148 45334434 11600 48 88 81 153 13 8971 36 9047 24 5430 93 5512 13 5433 39 -4055 88 3615 49 1 81 5946434 05 091356 75 70 25823901 -148 45322865 11632 20 66 16 152 55 8972 20 9048 08 5461 85 5543 84 5164 09 -4084 07 3629 96 2 75 5946406 21 691371 93 70 25816191 -148 45311178 11663 46 86 31 152 57 8973 71 9049 59 5492 32 557506 5494 36 -4111 78 3644 35 5 92 5946378 87 691387 00 70 25808619 -148 45299562 11694 93 87 15 152 24 8975 50 9051 38 5523 01 5606 48 5524 86 -4139 83 3858 90 2 87 5946351 40 691402 24 70 25801011 -148 45287811 11726 84 87 86 152 29 8976 69 9052 77 5554 16 5638 36 5555 83 -4167 84 3673 74 2 23 5946323 56 691417 78 70 25793300 -148 45275832 11757 79 87 90 152 13 8978 04 9053 92 5584 39 5689 29 5585 90 -4195 20 3688 16 0 53 5946296 57 691432 87 70 25785823 -148 45264189 11790 04 88 60 152 03 8979 02 9054 90 5615 91 5701 52 5617 26 -4223 69 3703 25 2 19 5946268 47 691448 67 70 25778040 -148 45252003 11821 79 87 54 151 57 8980 09 9055 97 5846 98 5733 25 5648 18 -4251 65 3718 25 3 64 5946240 89 691484 36 70 25770398 -148 45239896 11851 95 86 47 152 21 8981 67 9057 55 5676 45 5763 37 5677 52 -4278 22 3732 44 4 13 5946214 69 691479 20 70 25763138 -148 45228439 11884 91 87 91 155 66 8983 29 9059 17 5708 40 5796 29 5709 32 -4307 79 3746 90 11 33 5946185 49 691494 40 70 25755059 -148 45216764 11916 10 91 47 156 42 8983 45 9059 33 5738 37 5827 48 5739 14 -4336 28 3759 56 11 67 5946157 32 691507 77 70 25747272 -148 45206541 11947 70 93 28 157 21 8982 14 9058 02 5768 59 5659 05 5769 21 -4365 30 3771 99 6 25 5946128 62 691520 92 70 25739342 -148 45196508 11980 52 93 57 158 28 8980 18 9056 06 5799 80 5891 81 5800 28 -4395 62 3784 40 3 37 5946098 82 691534 07 70 25731057 -14545186493 12010 91 91 93 157 94 8978 73 9054 61 5828 65 5922 16 5829 01 -4423 79 3795 72 5 51 5946070 75 691546 09 70 25723361 -148 45177359 12043 16 91 46 158 51 8977 77 9053 65 5559 27 5954 40 5859 53 -4453 73 3807 68 2 29 5946041 12 691558 79 70 25715181 -148 45167708 12074 81 90 44 158 08 8977 25 9053 13 5889 32 5986 04 5889 49 -4483 13 3819 38 3 50 5946012 02 691571 22 70 25707147 -148 45158262 12106 50 87 91 159 25 8977 70 9053 58 5919 34 6017 73 5919 44 -4512 84 3830 91 8 80 5945982 81 691583 48 70 25699083 -148 45148959 12138 31 88 00 160 95 8978 84 9054 72 5949 19 6049 52 5949 24 -4542 53 3841 73 5 35 5945953 20 691595 04 70 25690915 -148 45140227 12169 53 66 31 161 73 8979 84 9055 72 5978 26 8080 72 5978 27 -4572 09 3851 71 2 69 5945923 DO 691605 76 70 25662838 -148 45132172 12201 13 60 05 163 21 8980 85 9056 73 6007 44 6112 30 6007 44 -4602 21 3861 22 4 75 5945894 03 691818 02 70 25674809 -148 45124497 12232 69 88 81 183 24 8981 77 9057 85 6036 44 6143 85 6036 45 -4632 41 3870 33 1 78 5945864 06 691625 87 70 25666356 -148 45117152 12263 87 89 58 162 77 8982 26 905814 6065 14 6175 03 6065 18 -4882 23 3879 44 3 46 5945834 49 891835 72 70 25058210 -148 45109800 12295 50 90 64 161 99 8982 20 9058 08 6094 38 620666 6094 49 -4692 37 3869 02 4 18 5945804 59 691648 05 70 25649973 -148 45102076 12327 21 91 25 161 95 8981 68 9057 56 6123 79 6238 36 6123 98 -4722 52 3898 83 1 93 5945774 70 691656 61 70 25641735 -148 45094159 12358 68 89 82 161 73 8981 38 9057 28 6153 00 6269 83 6153 29 -4752 42 3908 84 4 60 5945745 05 691667 16 70 25633565 -148 45086246 12391 51 89 75 160 33 8981 50 9057 38 6183 85 630268 6184 06 -4783 47 3919 31 4 27 5945714 29 691078 60 70 25525082 -148 45077635 12422 30 89 88 161 82 8961 66 9057 54 6212 40 6333 45 6212 94 -4812 57 3929 35 4 20 5945685 44 691689 36 70 25817129 -148 45089537 12454 96 88 58 162 26 8982 15 9058 03 6242 89 8366 10 6243 40 -4843 62 3939 47 3 90 5945654 66 691700 25 70 25008645 -148 45061369 12486 50 88 58 163 26 8982 94 9058 62 6271 77 6397 64 6272 67 -4873 73 3946 81 3 17 5945624 79 691710 34 70 25600417 -148 45053831 12517 54 88 89 165 27 8983 62 9059 50 6300 06 6428 67 6301 19 -4903 60 3957 23 6 55 594559514 891719 50 70 25592258 -148 45047043 12549 35 88 85 165 35 8984 25 9060 13 8328 81 6460 47 6330 21 -4934 37 3965 29 0 28 5945564 59 891728 33 70 25583851 -148 45040539 12581 23 66 31 165 16 8985 04 9060 92 6357 64 6492 34 6350 33 -4985 19 3973 41 1 60 5945533 98 691737 21 70 25575430 -148 45033998 12613 12 86 03 165 26 8966 06 9061 94 6386 48 6524 22 6386 48 -4996 01 3961 54 0 96 5945503 38 891746 10 70 25587009 -148 45027440 Dolling Office 2 6 1166 0 Prudhoe Bay Unit-EOA\DS-02\02-12/02-12D\02-12D 2/20/2013 4 38 PM Page 7 of 8 CommentsMD Incl Arlm True TVDSS TVD VSEC AHD Closure NS EW DLS Northing Eating Latitude Longitude 01 PI (1 an (Sl Ina (St on Int an (t1005( IMISI 1111151 P1 '(9 12644 72 58 20 165 52 8987 10 9062 98 6415 01 6555 80 6417 36 -5026 57 3989 50 0 93 5945473 02 691754 82 70 25558856 -146 45021020 12676 53 88 00 165 52 8988 15 9064 03 6443 70 6587 59 6446 43 -5057 35 3997 45 0 63 5945442 45 691763 54 70 25550247 -148 45014610 12707 23 89 99 165 95 8988 69 9064 57 6471 35 6618 28 6474 46 -5087 10 4005 01 6 63 5945412 90 691771 84 70 25542119 -148 45008511 12738 56 91 46 166 11 8988 29 9064 17 6499 51 8849 61 6503 04 -5117 50 4012 57 4 72 5945382 70 691780 16 70 25533813 -148 45002413 12771 29 91 97 166 77 8987 31 9063 19 6528 80 6652 33 6532 82 -5149 30 4020 24 2 55 5945351 10 691785 62 70 25525124 -148 44996229 12801 16 91 77 166 44 8986 34 9062 22 6555 50 6712 18 6559 97 -5178 34 4027 16 1 29 5945322 24 69179615 70 25517189 -148 44990653 12834 24 91 43 166 09 8985 41 9081 29 6585 15 6745 25 6590 16 -5110 47 4035 01 1 47 5945290 33 691804 90 70 25506412 -148 44951322 12866 38 91 39 166 16 898162 9060 50 6614 00 6777 36 6619 55 -5241 66 4042 71 0 31 5945259 34 691813 38 70 25499689 -148 44978114 12885 91 91 22 166 31 8984 18 9060 06 6631 51 6796 90 6637 41 -5260 63 4047 35 1 10 5945240 50 891518 49 70 25494707 -148 44974371 12951 00 91 22 168 31 8982 79 9056 67 6689 85 6861 96 6696 97 -5323 85 4062 75 0 00 5945177 68 691535 46 70 25477432 -148 44961954 Survey Error Model ISCWSA Rer 0'••3-0 95 000%Confidence 2 7955 sigma Survey Program MD From MD To EOU Frog Hob Sim Casing Diameter DescriptionMD (NI (11) (in) (in) Survey Tool TypeBorehole I Survey 0 000 8500 000 Act Stns 12 250 9 625 GYD-CT-CMS 0 2-1 2 1 02-12 5500 000 9675 000 Act Stns 6 500 7 000 GYO-CT-CMS 02.120/02-120 9675 000 9736 590 Act Stns 6125 4 500 INC+TREND 02-120 102-12D 9736 590 12885 910 Act Stns 6 125 4 500 MWD+IFR+MS 02-120 4 02-120 12885 910 12951 000 Act Stns 6125 4 600 BLIND 02-120 402-120 Legal Description. Northing(VI Eating(A) Surface 4475 9 FSL 4385 7 FEL S36 T11 N R14E UM 5950398 270 857641 510 BHL 4431 FSL 326 FEL 1 T1ON R14EUM 5945177 680 691835 460 • Dnlling Office 2 6 1166 0 Prudhoe Bay Unit-BOA\DS-02\02-12\02-12D\02-12D 2/20/2013 438 PM Page 8 of 8 Guhl, Meredith D (DOA) From: Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent: Thursday, March 13, 2014 3:35 PM To: Guhl, Meredith D (DOA) Cc: Rose, John G (ASRC) Subject: FW: Reporting Compliance PBU 02-12D Meredith, We have located the logs requested, and sent them to you both in hardcopy and digital form this afternoon. Please let me know if you need anything else or have any questions. Thanks! Joe From: Rose, John G (ASRC) Sent: Wednesday, March 12, 2014 8:30 AM To: Lastufka, Joseph N Subject: RE: Reporting Compliance PBU 02-12D Schlumberger did the work on this well and please feel free to communicate directly with Meredith to make sure she is OK with our response. And please CC me on your communications so that I can place the e-mail trail into the well files. Thanks for your help. -jr John G Rose BP Staff Engineer Anchorage.AK rosel 1 @bp corn 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Horne From: Lastufka, Joseph N Sent: Wednesday, March 12, 2014 7:55 AM To: Rose, John G (ASRC) Subject: RE: Reporting Compliance PBU 02-12D John, I can request the PDC (Petrotechnical Data Center)to follow up on the logs and make sure that they are sent out ASAP. Do you happen to know the vendor? Thanks! Joe From: Rose, John G (ASRC) Sent: Wednesday, March 12, 2014 6:37 AM To: Lastufka, Joseph N Subject: FW: Reporting Compliance PBU 02-12D 1 Joe, Who would normally make sure these logs get to the State? -jr John G Rose BP Staff Engineer Anchorage,AK rose11 @bp corn 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Guhl, Meredith D (DOA) [mailto:meredith.guhl©©alaska.gov] Sent: Tuesday, March 11, 2014 2:44 PM To: Rose, John G (ASRC) Cc: Davies, Stephen F(DOA) Subject: Reporting Compliance PBU 02-12D Dear Mr. Rose: I am completing the final compliance check for PBU 02-12D, PTD 212-104,API 50-029-20277-04-00, completed 2/7/2013. On form 10-407, in Box 21,the following logs were listed as obtained: MWD/GR/RES, MWD/GR/RES/NEU/DEN, USIT. At this time I have only received the USIT log. As required by Statute AS 31.05.030(d)(2)(B)and Regulation 20 AAC 25.071 and noted on form 10-407,electronic and printed copies of the logs are required as part of the well completion report. Please submit the MWD/GR/RES, MWD/GR/RES/NEU/DEN logs in both electronic and paper form by April 11, 2014. If you have any questions, please contact me. Sincerely, Meredith Guhl Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission meredith.guhl@alaska.gov Direct: (907)793-1235 2 Guhl, Meredith D (DOA) From: Rose, John G (ASRC) [John.G.Rose@bp.com] Sent: Wednesday, March 12, 2014 6:53 AM To: Guhl, Meredith D (DOA) Cc: Davies, Stephen F (DOA) Subject: RE: Reporting Compliance PBU 02-12D Meredith, I will look into it ASAP. -jr John G Rose BP Staff Engineer Anchorage,AK rosel1@bp corn 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home From: Guhl, Meredith D (DOA) [mailto:meredith.guhl@alaska.gov] Sent: Tuesday, March 11, 2014 2:44 PM To: Rose, John G (ASRC) Cc: Davies, Stephen F (DOA) Subject: Reporting Compliance PBU 02-12D Dear Mr. Rose: I am completing the final compliance check for PBU 02-12D, PTD 212-104,API 50-029-20277-04-00, completed 2/7/2013. On form 10-407, in Box 21,the following logs were listed as obtained: MWD/GR/RES, MWD/GR/RES/NEU/DEN, USIT. At this time I have only received the USIT log.As required by Statute AS 31.05.030(d)(2)(B)and Regulation 20 AAC 25.071 and noted on form 10-407, electronic and printed copies of the logs are required as part of the well completion report. Please submit the MWD/GR/RES, MWD/GR/RES/NEU/DEN logs in both electronic and paper form by April 11, 2014. If you have any questions, please contact me. Sincerely, Meredith Guhl Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission meredith.guhl@alaska.gov Direct: (907) 793-1235 1 Guhl, Meredith D (DOA) From: Guhl, Meredith D (DOA) Sent: Tuesday, March 11, 2014 2:44 PM To: 'john.g.rose@bp.com' Cc: Davies, Stephen F (DOA) Subject: Reporting Compliance PBU 02-12D Dear Mr. Rose: I am completing the final compliance check for PBU 02-12D, PTD 212-104,API 50-029-20277-04-00, completed 2/7/2013. On form 10-407, in Box 21,the following logs were listed as obtained: MWD/GR/RES, MWD/GR/RES/NEU/DEN, USIT. At this time I have only received the USIT log. As required by Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071 and noted on form 10-407, electronic and printed copies of the logs are required as part of the well completion report. Please submit the MWD/GR/RES, MWD/GR/RES/NEU/DEN logs in both electronic and paper form by April 11, 2014. If you have any questions, please contact me. Sincerely, Meredith Guhl Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission meredith.guhl@alaska.gov Direct: (907)793-1235 1 STATE OF ALASKA RECEIVED • AL..)KA OIL AND GAS CONSERVATION COMMIE ,ION DEC 10 2013 REPORT OF SUNDRY WELL OPERATIONS (� 1 Operations Abandon U Repair Well U Plug Perforations U. Perforate U, Other U AOG CC Performed. Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WeII❑ 2 Operator 4 Well Class Before Work 5 Permit to Dnll Number Name BP Exploration(Alaska),Inc Development[] Exploratory ❑ 212-104-0 " 3 Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20277-04-00 • 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028311I 1:11,01t)1,..160t PBU 02-12D • 9 Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL' 11 Present Well Condition Summary' Total Depth measured 12951 feet Plugs measured 12230 feet true vertical 9058.67 feet Junk measured None feet Effective Depth measured 12230 feet Packer measured See Attachment feet true vertical 9057 58 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 46-126 46-126 1530 520 Surface 2681 13-3/8"72#N-80 46-2727 46-2726 96 4930 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11729-11759 feet 11759-11789 feet 11809-11839 feet 11914-11944 feet 11959-11989 feet 11989-12019 feet 12019-12049 feet 12260-12475 feet 12525-12850 feet True Vertical depth 9052 85-9053.96 feet 9053 96-9054 88 feet 9055 47-9056 8 feet 9059 38-9058.23 feet 9057 37-9055.57 feet 9055.57-9054 34 feet 9054 34-9053.51 feet 9058.11-9058 53 feet 9059 64-9060 9 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 44-9525 44-8286 5 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation: 329 34679 20 0 1592 Subsequent to operation: 0 0 0 0 0 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratoru Development❑✓ a Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work. Oil [. Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt N/A Contact Garry Catron Email Garry.CatronABP.Com Printed Name Garry Catron Title PDC PE Signature A 4,,, C-j /\ Phone 564-4424 Date 12/10/2013 ti: ! i4 RBDMS DEC 1 (" tog vg/ Aft ,Y Form 10-404 Revised 10/2012 �/ Submit Original Only Packers and SSV's Attachment ADL0028311 SW Name Type MD TVD Depscription 02-12D PACKER 8353 7218.13 7" Baker HRD-E ZXP LTP 02-12D PACKER 9400 8103.78 4-1/2" HES TNT Perm Packer 02-12D PACKER 9531 8215.77 5" HRD-E ZXP Packer m a o 0 0 0 0 0 0 0 0 0 0 0 0 RN vCocoaomo (0ODN- o Lnv � LULUOON- oN- o (0L0 O LO 00 IN- Ln L0Lf) LO N N- U 15 0 0 0 — 0 0 0 0 0 0 0 0 0 I- M t N M M Lf) LU f- LU I- LU M M • U) N O c- CO v- 0D •- O NI- 00 m v- r- CD 00 00 00 00 CO CO CO 00 0D O CA CA G) CO O N O M M M M N N- M N W m M 110 Lf) LOQ W O O M O N N N V 0 0 0 (M V- Ln W V' N- (O 00 (A ()) CA N N N N O N- N H M M M 0) 0) 0) 0) (0 () W = = s- in V' CA N I� M () d- V 00 00 00 00 W O M M M V Nr N N N N r--- 00W00 N N N N O o MMM Lf) O M M � = N- L() N O O C)) CA CO CA M m Lo N N L CA N N N N I- 00 N (A V car i � r < M N 0) 0) 0) LO C) CO 00 � 00 (y V M tf) Ln Ln V M Ll7 Cb C c (00) 0) 0) N N N N N - i C :I— Q oa `no `nL coo Ln Lo Lr o co w o (D M M M J 2 Z 2 Z J Z M J *k *k *k *k * * * *k N *k 53 m- D ODao v v v v — = r M O O O M M N LU M Lf) N- V 00 00 C 00 M V V V M OO N O O 't 4) = MCOMN L.() N O) J ZZZZZZ 000000 N > » » » QU MoCCI2CCCI:C00000OWZ U Z W W W W 0 0 0 0 0 0CC m O Z_ Z_ Z_ Z_ er� [xe a c j D U J J J J !LL M M d M M O H E ƒ i § \ \ B < O \ E x II CO - c 0 c> k 2 6 6 c t 5 5 < CO C _ c / '& c • / / ° $ 5 / 0 ® it » , a \ U I ® �0 g y E e o_ / $ / / f § \ 1_,_ c /fX \ co TD co •/ y o � \ / -0/ \ q0 - o - \ 0 - \ - © a q $ / _ / fx % / L \ wtes- 2 / \ < \ ƒ I § � b n \ / / ° < / 3 CO -c \ ƒ O a) cz cc- z / - i / S - $ 2 o - - / / c 0 = o 6 \ c . CCr _ - CD / � $ § % kJ %2 � � E < ;kr2 / / J E ® & ..-• < i -& ƒ e e co < ¥ \ ? w ? _ o / / d 0 C / 0 © \ / \ k I ° / # E S % " c ± k E \ $ 9 ® X k 0 0 E \ e ? c u) ƒ $ y I 2 / O / t \ = E % _ 0 $ co 0 as I an ƒ I CE \ � \ \ L ± To CL fa. k E = a k o x / -0 \ / � Gogo ± a e 6 2 \ ƒ \ \ F ƒ a \ a- ƒ 7 6 \ g re) a Eoa .c _ ® ? . ƒ O a - SE q ® 2 3 t 0 O C = O 3 0 » $ E a o 0 y b ± 0 ° = E R 0 # 2 m co \ \ / � 0 _1 / mak : / coo � co = � � � co rY _O (NI 0 2 a o2 / ¥ % .Q ƒ 2 �� I - A = a ƒ- 5 CL o \ \ / a) CN ƒ J \ / f / 0_ Ce CO n 2 > > \ d % E ¢ E o ,- / © e% S 2 2 � 2 co 5 / CO ° \ � CD i / E ^ \ k k1=1 % ® / \ ( e. > / \ 2 2 / '- x ƒ \ \ 9 i « C) f / / ° t c S w / - £ . e x c - _ — = m — G o E \ a s_ e o I b \ b c - ) o o w o + @ G = � a) = -3 ¥ Qm o G 0 £ _ • • : / / \ t \ k L - % < ° \ H / o ® co / ' co o 0 o co .-. W e \ I I E < o = m I E c ,- E \ Em co 2 .E \ _ -2 - o R en = O .§ k 4 G o¥ q k G a = - ? R t = \ 7 ® 4L.75 / _ = g t G\ 2 \ E � 5 e # v o o = c 6 ± o 0 Q ƒ ƒ o \ 0 '- O o \ 2 \ 0 // } / 0 0 0 c m o / ; - CO CO CO 7 3 7 9 CV 9 9 Lc) @ » \ 2 2 \ \ ba 2 = 8Da \ ,- o \ .� / 2 il a 2 5 - s a p o g \ b E b c w a f b C Q g © o © � g © m ® � < \ a e % 5 a e 2 5 > x r ,- U t x n O L U g \ 5 o % q a w 't \ E t • / / E b a) =i % k ƒ —i % / \ % 0 _ m 5 _ e w 2 / J@ § 2 - J@ % 0 2 % « yaf2 « y2f2 0 < 6 2 �- n o ± g ° = Cl) £ \ CO < E I < E < co p O I n e 2 G i - 2 _ . G � \ \ m / \ / d / 2 \ \ / - / / e [ Co k 9 [ •Co x _c O o a 2 = o O e g o a E o k at ƒ \ § c a- \ / CO ƒ / 0 \ / we » GD = R O � o � 2 " 0_ � § � � k tii 0_ / _ E ® I b § a- ± I b \ _ Ct E __ CD CO Csi t k \ ( t k / ) § / k e e _ - _ � � ƒ / f % ƒ / 2gJ 2 / \ % ▪ D ° & \/ o E � /a \ O \ �I O < f CO e = e \ 6 = 5 Q a = O . 4 0 ,-- � # cam = / J \ \ E ■ — § oma § oma e o © e/ = 0 co 6/ 2 a. 0 'o % = ƒ �2 % = ƒ � 2 E § \ ,- =CU �� .4 t \ �� 4 t \ $ E » !I p > 7 0 0 = 4, > g o o = o : -a > $ t o o = W g - 0 6 = ® 2 g - 0/ \ / \ /k ) 3 \ co /k 7 / % 7 \ o £ n - ac 0 £ ria = c Goo \ \ .§ / R B \ .§ f / R J B / R G 7 E D0 cci- © ± / wa. § \ / © ® s 0 2 k f - o » / k k ._ \ a CO 2 < c k % J = / § o § g f / / § o q 2 f \ / : / / I R / O 0 0 = I of 0 0 0 = E ori : : m U cC ct t co co co \ \ \ \ \ / MEL= 4-1/8"5K CNV — = 02-121) SAFE.. TLANGLEO _ CHROME TBG&LM2 INITIAL,A,B&CWELLBORESACTUATOR = ? tJTAAL KB.ELE 56' NOT SHOWN BELOW 9-518"WHIPSTOCK"" NTIAL BF.ELEV= KOP= 3100' 1988' —14-112"HES X NIP,D=3.813" Max Angle= 94°G 11981' 20"CONDUCTOR —+ 80' Datum MD= 10331' 94#,H-40, 2362' H95/8"FO CEKENTB2 Datum 11/D= 8800'SS 1)=19.124' 2490' —195/8"FO CEW 31,11 R 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT H 2386' GAS LIFT MANDRELS 13-3/8"CSG,72#,N-80 BUTT,O=12.347" —1 2702' ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3512 3493 22 MMG DOME RK 16 02/14/13 3 6028 5492 44 MUG DOME RK 16 02/14/13 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD H 7793' - 1 >< 2 7973 6988 37 MAG DMY FE 0 02/04/13 1 9296 8088 28 KBG2 DMY BK-2 0 02/04/13 9-5/8"BKR GEN I WHIPSTOCK(12/27/12) —1 8511' 8342' 9-5/8"X r BKR Fes!EZXPN LIP \ w/11'TIEBACKO=7.750' 9-5/8"CSG,47#,J&L-95 HARD, O=8.681" —1 —8511 7 V \ , 8358' —19-518"X 7"BKR FLEX LOCK HGR,D=6.180" Minimum ID =3.725" @ 9512' 9-5/8'MILLOUT VVNDOW(02-12D)8511'-8528' 4-1/2" HES XN NIPPLE 9372' H4-1/2"HES X NP,D=3.813" I 7"LNR,26#,L-80 VAM TOP XO TO L-80 BTC-M —{ 9589' z \.< TOP OF 4-1/2"LNR H 9519' I 9400' H7'X4-1/2" TNT PKR D=3.856" �H4"112"FESX NI?D=3.813' X 4-1/2'TBG,12.6#,13CR-$0 VAM TOP, —1 9523' ' 9512' _-14-1/2"HES XN NP,D=3.725° .0152 bpf,D=3.958- 7'LNR,26#,L-80 BTC-M,.0383 bpf,D=3.958" —I 9692' 1 9519' H7"X 5"BKR ISE ZXPN LTP w/TIBK,D=4.320" 9525' H4-1/2"WLEG,D=4.00" ii FEFORATION SUI1AMNRYH BMD TT NOT LOGGED REF LOG:SLB CCR/GR/MSP/GPFT/USIT ON 01/12/13 \ ANGLE AT TOP OF F . 88°@ 11750' \ 9542' —1 7'X 5'BKR FLEXLOCK HGR D=3.87" Note:Refer to Production DV for historical perf data 9551' H 7"X 5"XO,D=3.958" SIZE SPF NTERVAL Opn/Sqz SHOT SUZ , 2-7/8" 6' 11750-11780 0 11/08/13 2-7/8" 6' 11780-11810 0 11/08/13 2-7/8" 6' 11830-11860 0 11/07/13 2-7/8" 6' 11935-11965 0 11/07/13 I 2-7/8" 6' 11980-12010 0 11/07/13 2-7/8" 6' 12010-12040 0 11/06/13 2-7/8" 6' 12040-12070 0 11/06/13 12230' —2-7/8"VVFD CSP(11/05/13) 2-7/8" 6' 12260-12475 C 02/06/13 2-7/8" 6' 12525-12850 C 02/06/13 I PBTD — 12858' .. 4-112"LNR,12.6#,13CR-$5 VAM TOP, —1 12949' tie:1111i p. .0152 bpf,O=3.958" DATE ( FEV BY COMMENTS DATE REV BY COMMENTS ITS PRUDHOE BAY UNIT 12/30/77T PKR 141 INITIAL COMPLETION 02/20/13 TBD/PJC GLV C/O(02/14/13) VVH-L: 02-12D 11/15/95 N3S CTD SIDETRACK(02-12A) 02/21/13 PJC DRLG CORS PERMIT No: 2121040 06/22/07 N4E5 CTD SIDETRACK(02-12B) 015/28 JGRI PJC FINAL ODE APPROVAL(02/11/13) AR No: 50-029-20277-04 04/26/11 NORDIC 1 SUSPBJ)ED CTD(02-12C) 11/11/13 JDMJMD SET CEP&ADPERFS(11/05-08/13) SEC 36,T11 N,R14E 804'FTL&894'FWL 02107113 PKR 273 SIDETRACK(02-12D) 02/07/13 PJC DRLG DRAFT CORRECTIONS BP Bcploration (Alaska) tftULIVlD MAR 0 4 2013 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION AOGCC WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status. IN Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 1b. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One ®Development 0 Service 2. Operator Name 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 2/7/2013 212-104 3. Address. 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 12/31/2012 50-029-20277-04-00 • 4a Location of Well(Governmental Section). 7.Date T D.Reached: 14. Well Name and Number Surface: 1/27/2013 PBU 02-12D 804'FNL,894' FWL, Sec. 36,T11 N, R14E, UM 8. KB(ft above MSL): 75 88' 15.Field/Pool(s) Top of Productive Horizon: 3992"FNL,4062'FWL, Sec. 36,T11 N, R14E, UM GL(ft above MSL). Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 847' FNL,4957' FWL, Sec. 01,T1ON, R14E, UM 12858' 9061' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation. Surface: x- 687642 y- 5950398 Zone- ASP4 12951' 9059' ADL 028308&028311 TPI: x- 690890 y- 5947290 Zone- ASP4 11.SSSV Depth(MD+TVD) 17 Land Use Permit: Total Depth:x- 691839 y- 5945179 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20 Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD. MWD/GR/RES, MWD/GR/RES/NEU/DEN, USIT 8511' 7422' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 109' Surface 109' 30" 255 sx Arcticset 13-3/8" 72# N-80 Surface 2702' Surface 2702' 17-1/2" 7200 sx Arcticset 9-5/8" 47# N-80 RS-95 •Surface 8511' Surface 7422' 12-1/4" 1000 sx Class'G' J 7" 26# L-80 8342' 9692' 7285' 8430' 8-1/2" 275 sx Class'G' 4-1/2" 12.6# , 13Cr85 9519' , 12949' 8281' 9059' 6-1/8" 432 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25 TUBING RECORD If Yes,list each interval o en SIZE DEPTH SET(MD) PACKER SET(MD I ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 2-7/8"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85 9525' 9400'/8180' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 12260'-12475' 9058'-9059' 12525'-12850' 9060'-9061' ; 11J`c WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No ( DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED #de8tr.) 2100' Freeze Protect w/Diesel 27 PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc February 24,2013 Flowing Date of Test Hours Tested Production For OIL-BBL: GAS-MCF. WATER-BBL: CHOKE SIZE' GAS-OIL RATIO: 2/24/2013 8 Test Period 4 438 7916 25 89 18086 Flow Tubing Casing Press: Calculated OIL-BBL' GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 420 1300 24-Hour Rate 4 1313' 23748 76 Not Available 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071 None RBDMS MAR 0 5 ,�� Form 10-407 Revised 10/2012 ;� CONTINUED ON REVERSE / L% Submit Original Only VLF (/241 ly /7 29. GEOLOGIC MARKERS(List all formations ar kers encounter 30. FORMATION TESTS NAME ND Well Tested? ,J Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results. Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25.071. Coleville Mudstone 8768' 7631' HRZ 9209' 8012' Kalubik 9442' 8215' Sag River 9689' 8428' Shublik A 9733' 8465' Shublik B 9753' 8482' Shublik C 9776' 8501' Sadlerochit 9815' 8533' 45SB/Zone 4B 9887' 8591' 42SB/Zone 4A 9967' 8651' CGL/Zone 3 10084' 8732' Base of CGL/Zone 2C 10193' 8798' 23SB/Zone 2B 10338' 8880' 22TS 10417' 8920' 21 TS/Zone 2A 10511' 8964' Zone 1B 10620' 9007' TDF/Zone 1A 10697' 9029' TDF/Zone 1A/Base Zone 1B 12533' 9060' (Invert) Formation at Total Depth: Zone 1B(From Base) 12533' 9060' 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys 32 I hereby certify that the foregoing is true and correct to the best of my knowledge Contact J... Rose,56 271 Email. John.G.Rose@bp.com Title. Drilling Technologist Printed Name' .-stufkA Signature: � ti Phone 564-4091 Date: 54/6 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells' Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8. The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00) Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23 Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain) Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071 Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/8"5K CMV ACTUATOR= ? PJC DRAFT 02 1213 CHROME TBG&LNR LA INITIAL,A,B&CWELLBORPS NTIAL KB.ELE 56' 1 L NOT SHOWN BELOW 9-5/8"WHIPSTOCK"" ,_ NTLAL BF.ELEV= KOP= 3100 20"CONDUCTOR — 80' , 1988' H4-112"HES X NP,D=3.813" Max Angle 94"@ 11981' Datum M3= 10331' 94#,H-40, — 2362' H95/8"FO CaU4TER Datum ND= 8800'SS D=19.124' x — 2490' —95/8"FO CEMENTER 9-5/8"CSG,474,J&L-95-SOFT XO TO N-80 BUTT — 2386' h. GAS LIFT MANIJRTiS 13-3/8"CSG,72#,N-80 BUTT,ID=12.347" — 2702' ST MD TV D DEV TY FE VLV LATCH PORT DATE 4 3512 3493 22 MPG DOME RK 16 02/14/13 3 6028 5492 44 MIG DOME RK 16 02/14/13 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD H 7793' ,---.x >< 2 7973 6988 37 MIG DMY RK 0 02/04/13 . 1 9296 8088 28 KBG2 DMY BK-2 0 02/04/13 9-518"BKR GEN I HPSTOCK(12/27/12) H 8511' 8342' —9-518"X 7"BKR HRD E ZXPN LTP W \ w!11'TIEBACK,D=7.750" 9-5/8"CSG,47#,J&L-95 HARD, D=8.681" —{ —8511 Minimum ID =3.725" @ 9512' 8359' H9-5/8"X 7'BKR FLEX LOCK HGR,ID=6.180' 9-5/8"MLLOUT WINDOW(02-120)8511'-8528' 4-1/2" HES XN NIPPLE ' 9372' H4-1/2"HES X NIP,D=3.813" Z X 9400' H 7"X 4-1/2"HES TNT PKR,D=3.856" ' ,---H 9436' —4-1/2"HES X NIP,ID=3,813" 7"LNR 264,L-80 VAM TOP XO TO L-80 BTC-M — 9569' x x ' r----1 9512' H4-1/2"HES XN NP,D=3.725" 9519' —17"X 5"BKR I-RD-E ZXPN LTP w/TEBK,D=4.320" TOP OF 4-1/2"LNR -{ 9519' 4-1/2"TBG, 12.64,13CR-85 VAM TOP, H 9523' } 9525' —4-1/2"WLEG,D=4.00" .0152 bpf,D=3.958" \ —I ELMD TT NOT LOGGED 9542' —7"X 5"BKR FLEX LOCK HGR,D=3.87" \I 9551' —{7"X 5"XO,D=3.958' 7"LNR,264,L-80 BTC-M,.0383 bpf,D=3.958" — 9692' , IETORATION SUMMARY REF LOG:SLB CCR/GR/MSP/GPfT/USIT ON 01/12/13 ANGLE AT TOP OF FERE: 89"@12260' Note:Refer to Roduction DV for historical perf data SIZE SPF NTHNAL Opn/Sqz SHOT SQZ 2-7/8" 6' 12260- 12475 0 02/06/13 2-7/8" 6' 12525- 12850 0 02/06/13 PBTD — 12858' II 4-1/2"LNR, 12.64,13CR-85 VAM TOP, — 12949' .`�`�•' • .0152 bpf,D=3.958" DATE REV BY COMMENTS DATE REV BY CONVENTS PRUDHOE BAY LINT 12/30/77 PKR141 INITIAL COMPLETION 02/20/13 TBD/PJC GLV CIO(02/14/13) 1NkLL: 02-12D 11/15/95 N3S CTD SIDETRACK(02-12A) 02/21/13 PJC 'DRLG CORRECTIONS PERk/IT No:`2121040 06/22/07 N413S CTD SIDETRACK(02-12B) API Nb: 50-029-20277-04 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) SEC 36,T11N,R14E,804'FNL&894'FWL 02/07/13 PKR273 SIDETRACK(02-12D) 02/07/13 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) BP AMERICA LOT / FIT Summary Well Name: 02-12D Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 12/29/12 LOT 8,520.00 7,450.33 10.40 734.00 4,759.12 12.30 01/17/13 FIT 9,692.00 8,450.00 8.50 395.00 4,126.18 9.40 Page 1 of 1 North America-ALASKA-BP Page 1 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 12/7/2012 End Date: 1/29/2013 X3-012G3-C:(9,728,000.00) _ Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/7/2012 08:00 - 12:00 4.00 MOB P PRE BEGIN RIG OPERATIONS WITH PARKER 273 NEW DRILLING RIG AT 08:00 ON 12/7/12. MOVE MUD MODULE FROM CRAZY HORSE PAD IN DEADHORSE TO DRILLSITE 2. 12:00 - 20:00 8.00 MOB P PRE CONTINUE WITH RIG MOVE -MUD MODULE FROM PARKER CRAZY HORSE PAD TO DRILL SITE 2. -STAGE MUD MODULE ON DRILL SITE 2 -NOTIFIED AOGCC OF IMPENDING 48-HR INITIAL RIG INSPECTION AND BOPE TEST, DECEMBER 06,2012,18:03-HRS. VERIFICATION OF NOTICE RECIEVED FROM AOGCC REPRESENITIVE CHUCK SCHEVE AT 05:34 AM,DECEMBER 07,2012. -UPDATE PROVIDED TOAOGCC REPRESENITIVE CHUCK SCHEVE AT 11:12 AM,DECEMBER 07,2012. 20:00 - 21:30 1.50 MOB P PRE PREPARE TO MOVE UTILITY MODULE -TRAVEL TO CRAZY HORSE PAD -WARM HYDRALIC MOVING SYSTEM ON UTILITY MODULE. 21:30 - 00:00 2.50 MOB P PRE MOVE UTILITY MODULE FROM CRAZY HORSE PAD -CONTINUE TO WARM UP MOVING SYSTEM ON UTILITY MODULE TO 95-100 DEG. -MOVE UTILITY MOD ACROSS CRAZY HORSE PAD SEVERAL TIMNES TO VERIFY HYDRAULIC SYSTEM IS WARM AND OPERATIONAL. -PULL MODULE ONTO ROAD AND MOVE TO JUST PAST BROOKS RANGE SUPPLY BY 24:00-HRS 12/8/2012 00:00 - 07:00 7.00 MOB P PRE RIG MOVE -MOVE UTILITY MODULE TO DS-02. 07:00 - 07:30 0.50 MOB P PRE CREW TRAVEL -DS-02 TO CRAZY HORSE PAD IN CREW VAN 07:30 - 10:30 3.00 MOB P PRE PREPARE TO MOVE DRILL MODULE -TURN AND WARM UP TIRES ON DRILL MODULE 10:30 - 12:00 1.50 MOB P PRE MOVE DRILL MODULE -PULL DRILL MODULE OFF PARKER CRAZY HORSE PAD -COMMENCE MOVE TO DS-02 12:00 - 22:00 10.00 MOB P PRE CONTINUE WITH MOVING DRILL MODULE TO DS-02 -REPAIR BREAKER FOR PUMP ON MOVING SYSTEM 22:00 - 00:00 2.00 MOB P PRE REPOSITION RIG -DUE TO SLOPED PORTION ON NORTH SIDE OF PAD AT ACCESS ROAD NEAR CORNER. -CRIB UP OFF DRILLER SIDE OF DRILL MOD. TO REPOSITION WHEELS -STRAIGHTEN WHEELS,CONTINUE WITH MOVING RIG DOWN PAD TOWARDS WELL. 12/9/2012 00:00 - 02:00 2.00 MOB P PRE MOVE DRILL MODULE ONTO MATS IN FRONT OF WELL 02-12 Printed 2/25/2013 10 56 42AM North America-ALASKA-BP Page 2 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 08:00 6.00 MOB P PRE POSITION DRILL MODULE OVER WELL 02-12 -PJSM FOR SPOTTING DRILL MODULE ON WELL. -FUNCTION TEST EMERGENCY STOP.NOT OPERABLE,DISCUSS PLAN FORWARD WITH WTL. -VERIFY OA,IA,TUBING ALL 0-PSI. 08:00 - 12:00 4.00 MOB P PRE SPOT UTLITIY MODULE -PREPARE TO SPOT MUD MODULE 12:00 - 13:00 1.00 MOB P PRE AFTER ACTION REVIEW(AAR) -AAR WITH BP-WSL,PARKER RIG MANAGER AND RIG CREW ON MOVE FROM CRAZY HORSE YARD TO DS-02 13:00 - 18:00 5.00 MOB P PRE CONTINUE MOVING MUD MODULE INTO POSITION -PIN PEDESTALS IN UTILITY MOD.AND MUD MOD.ON WELL END.- -RU FRONT OF UTILITY MOD.AND MUD MOD TO PIN ALL PEDESTALS. -RD AND CLOSE ALL CARRIER BAY DOORS. 18:00 - 00:00 6.00 MOB P PRE RIG UP FOR RIG ACCEPTANCE • -HOOK UP ALL SERVICE AND ELECTRICAL CONNECTIONS AT INTERCONNECTS FROM DRILL MODULE TO UTILITY AND MUD MODULES. 12/10/2012 00:00 - 03:00 3.00 'MOB P PRE PREPARE RIG FOR WELL OPERATION&RIG ACCEPTANCE. -RU DUMMY WELL HOUSE&CONNECT POWER TO SAME -RU HARD LINE&OPEN TOP TANK TO CELLAR. -SET IN POSITION CAMP&SHOP. 03:00 - 06:00 3.00 MOB P PRE RU HEATERS&ALL INTERCONNECTS AT DRILL,MUD&UTILITY MODULES. -CONNECT CEMENT LINE BETWEEN UTILITY MODULE&DRILL MODULES. -RU DOUBLE VALVE ON OA. 06:00 - 09:00 3.00 MOB P PRE SHIM UTILITY MODULE -BERM CUTTINGS TANK 09:00 - 12:00 3.00 MOB P PRE TAKE ON FRESH WATER TO BRINE TANKS -BRING ONBOARD BP OWNED NEW COMMISSION IRON PACKAGE FOR RIG 273, CERTIFIED FMC PLUG VALVES,SWIVEL'S& FLANGE ADAPTERS -REMOVE PARKER NONE CERTIFIED 1502 EQUIPMENT OFF RIG. -FUNCTION TEST BUMPER&A-LEG PINS -VISUAL DERRICK INSPECTION. -CONTINUE INSTALLING BELTS ON TRIP TANK PUMPS 12:00 - 15:00 3.00 MOB P PRE COMPLETE JSA'S&PERMITS FOR THE FOLLOWING TASKS -RAISING DERRICK,SKIDDING RIG FLOOR& HAUNCH -UNLOCK/UNTAG PITS,MANRIDER OPERATIONS -PIPEBARN&MOVING FLUID OPERATIONS PERFORM PRE-RAISING DERRICK CHECKLIST -WARM UP HYDRAULICS PRIOR TO DERRICK RAISING. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 3 of 61' Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UW:500292027700 Active datum 02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 16.00 1.00 MOB P PRE RAISE DERRICK -FLEX&WORK DERRICK SEVERAL TIMES PRIOR TO PULLING OFF HEADACHE RACK -RAISE DERRICK&PIN.DERRICK PULLS OFF RACK AT 570K -CLOSE V-DOOR AT RIG FLOOR. 16:00 - 17:00 1.00 MOB P PRE PREP&SKID RIG FLOOR. -BLOW DOWN STEAM TO RIG FLOOR -SKID RIG FLOOR 17:00 - 18:00 1.00 MOB P PRE SKID HAUNCH INTO DRILLING POSITION. -HOOK UP STEAM TO RIG FLOOR 18:00 - 00:00 6.00 MOB P PRE RU RIG FLOOR -BRIDAL DOWN BLOCKS -HANG BRIDAL LINES,PIN BLOCKS TO TD -TRANSFER WATER FROM PIT TO PIT. -UNPIN FORUM CRANE&BALL -PREP IDM,WIRE TIE BLOCK PIN KEEPERS -UNTIE SERVICE LOOPS&KELLY HOSE. -PIN TORQUE TUBE 12/11/2012 00.00 - 09:00 9.00 MOB P PRE GENERAL RIG UP OPERATIONS -PIN STABBING BOARD TO DRILLING POSITION. -MOVE IDM FROM STORAGE POSITION. -RAISE PIPE CAT -CONNECT STANDPIPE,CEMENT&MUD LINES TO MANIFOLD. -HAMMER UP JUMPER HOSE FROM MUD LINE TO FREEZE PROTECT MANIFOLD. -CUT GRATING AND FIT INTO CELLAR. -LEAKTIGHT PRESSURE TEST MUDLINE TO 625 PSI FOR 10 MIN. -GREASE VALVES ON TESTING MANIFOLD **PERFORM RIG EVACUATION DRILL WITH RIG TEAM 05:00 HRS** ACCEPT PARKER 273 DRILLING RIG AT 02:30 09:00 - 17:00 8.00 RIGU P PRE RIGUP FOR PRESSURE WELLBORE INTEGRITY PRESSURE TESTING. LEAKTIGHT TEST ALL SURFACE LINES,INCLUDING LINE OUT TO FLOWBACK TANK. UPDATE WORK SAFE PROCEDURE(WSP)AS RIG TEAM DURING RIGUP. LOAD PITS WITH SEAWATER. 17:00 - 18:30 1.50 RIGU P PRE PRESSURE UP DOWN IA WITH SEAWATER TO COMPLETE CMIT-TXIATO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TESTS,SEE ATTACHED DOCUMENTATION). TEST CONFIRMS CMT PLUG,FULL COLUMN KWF,AND BPV AS BARRIERS FOR NIPPLE DOWN OF TREE. RIG DOWN PRESSURE TESTING EQUIPMENT FROM IA. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 4 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations• (hr) (ft) 18:30 - 00:00 5.50 RIGU P PRE RIG UP TO OAAND LINEUP RIG TEST PUMP WITH DIESEL. UNSUCCESSFULLY ATTEMPT TO PRESSURE TEST OA TO 250 PSI LOWAND 2000 PSI HIGH FOR 30 MIN THREE TIMES. AFTER THIRD ATTEMPT DISCOVER MINOR LEAK AT FLANGE TO 1502 CONNECTION ON OUTER ANNULUS. ATTEMPT TO TEST OA FOURTH TIME UNSUCCESSFULLY(LOSSES 175 PSI IN FIRST 15 MIN AND 75 PSI IN SECOND 15 MIN). ALL PRESSURE TESTING CHARTS ARE ATTACHED. PER WELL PROGRAM,FAILING MIT-OA DOES NOT PREVENT CONTINUATION OF WELL PROGRAM. BASED ON PASSING CMIT-TXIA, PERMISSION TO PROCEED WITH NIPPLE DOWN OF TREE RECEIVED FROM WELLS TEAM LEADER AT.01:30 ON 12/12/12. 12/12/2012 00:00 - 01:30 1.50 RIGU P PRE BLOWDOWN AND RIG DOWN PRESSURE TESTING LINES AFTER INITIAL WELLBORE INTEGRITY TESTING. -THAW OUT SEVERAL SECTIONS OF LINE DUE TO FREEZING DURING BLOWDOWN OPERATIONS. 01:30 - 08:30 7.00 BOPSUR P PRE PREJOB SAFETY MEETING FOR NIPPLE DOWN TREE. FMC REPRESENTATIVE ONSITE TO BLEED OFF 500 PSI FROM CONTROL LINES. NIPPLE DOWN DOUBLE 7-1/16"MASTER VALVE DRYHOLE TREE AND FMC 13-5/8"X 7-1/16"TUBING HEAD ADAPTER FLANGE(NORM TEST AND SEND IN FOR INSPECTION). VERIFY 5-1/2"BTC CSG HANGER THREADS IN GOOD CONDITION. INSTALL FMC BLANKING PLUG WITH 9 TURNS. NOTE: TUBING HANGER HAS WELDED NECK. DISCUSS PLAN WITH BAKER TO USE SPEAR TO PULL TUBING. LIFT RISER SECTIONS INTO BOP DECK FOR BOP NIPPLE UP. 08:30 - 22:30 14.00 BOPSUR P PRE NIPPLE UP SPACER SPOOLS,FLOW NIPPLE, AND 13-5/8"5K SHAFFER BOP STACK AS FOLLOWS(SEE ATTACHED BOP STACK DIAGRAM): -13-5/8"SHAFFER SPHERICAL BOLTED COVER BOP -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS -13-5/8"5K SHAFFER LXT BLIND-SHEAR RAMS -MUD CROSS WITH 3-1/8"INNER MANUAL GATE VALVES AND OUTER 3-1/8"HCR VALVES ON BOTH CHOKE AND KILLS LINES. -13-5/8"5K SHAFFER LXT 2-7/8"X 5-1/2" VARIABLE BORE RAMS. GREASE ALL CHOKE MANIFOLD VALVES. INSTALL MOUSE HOLE. 22:30 - 00:00 1.50 BOPSUR P PRE OPEN RAM DOORS AND VISUALLY INSPECT ELEMENTS. ALL ARE IN GOOD CONDITION. Printed 2/25/2013 10:56:42AM Pae5of61, North America-ALASKA B 9 z �t� Operation Summary Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/13/2012 14:00 - 00:00 10.00 BOPSUR P PRE FUNCTION-PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MIN EACH PER AOGCC REQUIREMENTS AND BP DWOP STANDARDS. TESTS WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI. -TEST COMPLETED On 12/15/12. NOTE: DURING INITIAL 5000 PSI SHELL TEST AGAINST OUTER CHOKE VALVES,DISCOVER LEAKING DOOR SEALS ON UPPER RAMS. CHANGEOUT SAME. ALSO HAVE TO TIGHTEN KILL LINE K4 GATE VALVE FLANGE NOTE: DURING TESTING OF SUPERCHOKE, UNABLE TO BUILD AND HOLD ANY PRESSURE WITH SUPERCHOKE. CALL OUT MECHANIC AND MOVE TO NEXT TEST WHILE WAITING. ORIGINAL 24-HOURS NOTIFICATION OF INTENTION TO TEST BOPE WAS PROVIDED TO AOGCC REPRESENTATIVE LOU GRIMALDI BY EMAIL AT 16:00 ON 12/10/12. MR. GRIMALDI WAS UPDATED BY EMAIL ON 12/12/12 AT 05:45. FINAL CALLOUT TO LOCATION WAS AT 9:00 ON 12/13/12. 22:30-OA PRESSURE=400 PSI. BLEED OFF 5 GALLONS TO 0 PSI. 00:00 - 02:00 2.00 BOPSUR P _ PRE INSTALL BELL NIPPLE BETWEEN ANNULAR PREVENTER AND RIG FLOOR. WELDER ON LOCATION TO INSTALL CLAMP AROUND BELL NIPPLE TO HOLD IT IN THE CORRECT PLACE IN THE FUTURE. 02:00 - 09:30 7.50 BOPSUR P PRE RIG UP TO PRESSURE TEST BOPE. PRESSURE UP ACCUMULATOR. FUNCTION TEST BOPS. RUN 5-1/2"TEST JOINT IN HOLE AND SCREW INTO FMC BLANKING PLUG. FILLALL SURFACE LINES AND STACK. OPEN IA VALVES TO PRESSURE GAUGES TO MONITOR DURING TEST. 03:00-OA PRESSURE=500 PSI. BLEED OFF 8 GALLONS TO 0 PSI. 09:30 - 11:30 2.00 BOPSUR N SFAL 8,998.0 PRE ATTEMPT TO PERFORM FIRST TEST OF BOP PROCEDURE AS SHELL TEST. DISCOVER LEAK PATH OUT IA VALVE. DRAIN STACK, PULL TEST JOINT AND FMC BPV BLANKING PLUG. APPLY TEFLON PASTE TO THREADS AND REPLACE BALL IN BLANKING PLUG. RESET IN BPV THROUGH BOP STACK. 11:30 - 12:30 1.00 BOPSUR P PRE HOLD AAR WITH BOTH RIG CREWS TO DISCUSS BOP NIPPLE UP. 12:30 - 14:00 1.50 BOPSUR N SFAL 8,998.0 PRE FILL STACK AND SURFACE LINES. COMPLETE RIGGING UP FOR BOPE TEST. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP t, Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-120 ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12/14/2012 00:00 - 03:00 3.00 BOPSUR P PRE CONTINUE TO FUNCTION-PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MIN EACH PER AOGCC REQUIREMENTS AND BP DWOP STANDARDS. TESTS WITNESSED BY AOGCC REPRESENTATIVE LOU GRIMALDI. -ADDITIONAL COMMENTS ABOUT TEST ARE IN FINAL TIME SUMMARY ENTRY FOR BOPE ' TESTING ON 12/15/12. NOTE: DURINGACCUMULATOR FUNCTION TESTING,3300 PSI SYSTEM POPOFF RELEASED. CALL OUT MECHANIC. AOGCC REP LEAVES LOCATION. 03:00 - 16:00 13.00 BOPSUR N RREP 8;988.0 PRE IADC REPORT CODE 8 NPT: PARKER MECHANIC ONSITE TO REBUILD ACCUMULATOR POPOFF AND TROUBLESHOOT REMOTE HYDRAULIC CHOKE. CHOKEAPPEARS TO RE-OPEN WHEN HANDLE IS HELD OVER IN CLOSED POSITION. PARKER MECHANIC ONSITE TO ALSO TROUBLESHOOT AND REBUILD ACCUMULATOR AIR PUMPS. AOGCC REPRESENTATIVE LOU GRIMALDI RETURNS TO LOCATION AT 4 PM. 16:00 - 20:00 4.00 BOPSUR P PRE CONTINUE TO TROUBLESHOOT REMOTE HYDRAULIC CHOKE. COMPLETE ACCUMULATOR FUNCTION TESTING. COMPLETE BLIND-SHEAR FUNCTION-PRESSURE TEST+HT38 AND 4-1/2"IF FOSVS TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH(PASS). 20:00 - 00:00 4.00 BOPSUR N RREP 8,988.0 PRE IADC REPORT CODE 8 NPT: PARKER MECHANIC ON LOCATION TO CHANGEOUT SUPERCHOKE. 21:30-OA PRESSURE=225 PSI. BLEED OFF 2.5 GAL TO 0 PSI. 12/15/2012 00:00 - 06:00 6.00 BOPSUR N RREP 8,988.0 PRE CONTINUE IADC REPORT CODE 8 NPT: PARKER MECHANIC ON LOCATION TO CHANGEOUT SUPERCHOKE. AFTER REPLACEMENT,STILL HAVE SAME PROBLEM. UNABLE TO MATCH DIGITAL READOUT GAUGE ON RIG FLOOR CONTROL PANEL WITH ACTUAL CHOKE POSITION. CALLOUT ELECTRICIAN TO CHANGEOUT DIGITAL CHOKE POSITION GAUGE. AFTER INSTALLATION,RETEST BREAKS ON BOTH SIDES OF CHOKE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH(PASS). Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 7 of 61 Operation Summary Report L ; Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 • Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 10:00 4.00 BOPSUR P PRE CONTINUE BOP TESTING: RE-PRESSURE TEST CHOKE AND KILL HCR VALVES TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH DUE TO QUESTIONABLE EARLIER RESULTS. CHOKE HCR VALVE FAILS HIGH TEST. PERFORM FINAL ACCUMULATOR UNIT DRAWDOWN TEST. ALL COMPONENTS HAVE BEEN FUNCTIONED FROM ALL PRIMARY AND REMOTE STATIONS. 10:00 - 13:30 3.50 BOPSUR N RREP 8,988.0 PRE IADC REPORT CODE 8 NPT: CHANGEOUT CHOKE LINE HCR VALVE. 13:30 - 16:00 2.50 BOPSUR P PRE COMPLETE BOPE TESTING: PRESSURE TEST CHOKE LINE HCR VALVE+BREAKS TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH(PASSING TESTS). SUMMARY OF FULL 50 HR BOP TEST IS BELOW. -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED. -ANNULAR TESTED WITH 4"TEST JOINT. -VBRS TESTED WITH 4"AND 5-1/2"TEST JOINTS. -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED -HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. -14 N2 BOTTLES AVERAGE PRESSURE=2084 PSI -5 FAIUPASS RESULTS(UPPER VBRS, LOWER VBRS,SUPERCHOKE, ACCUMULATOR,AND CHOKE MANIFOLD VALVE 11) -ALL H2S AND LEL GAS ALARMS CALIBRATED AND TESTED. -PVT SYSTEM,INCLUDING FLOW PADDLE, CALIBRATED AND TESTED. 16:00 - 17:00 1.00 BOPSUR P PRE PULL TEST JOINT WITH FMC BLANKING PLUG FROM TBG HANGER PROFILE IN WELLHEAD. RIG DOWN TEST JOINT AND OTHER BOPE TESTING EQUIPMENT. 17:00 - 18:00 1.00 WHSUR P DECOMP RIG UP DUTCH RISER FROM ANNULAR PREVENTER TO RIG FLOOR. 18:00 - 21:00 3.00 WHSUR N WAIT 8,998.0 DECOMP WAIT ON DUTCH RISER 7"ACME X 7"OTIS XO FROM TOOL SERVICE. 21:00 - 00:00 3.00 WHSUR P DECOMP MIRU VALVE SHOP LUBRICATOR CREW. RIG UP SHORT"GRAY"LUBRICATOR TO DUTCH RISER. -RIG UP PRESSURE TESTING EQUIPMENT IN PREPARATION FOR TESTING LUBRICATOR WITH WELLBORE AND BLEEDING OFF TO FLOWBACK TANK. 12/16/2012 00:00 - 02:00 2.00 WHSUR P DECOMP RIG UP TO BLEED DOWN AFTER LUBRICATOR/WELLBORE TEST TO FLOWBACK TANK. -THAW FROZEN HARDLINE TO TANK. Printed 2/25/2013 10 56 42AM North America-ALASKA-BP Page 8 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 05:00 3.00 WHSUR P DECOMP PRESSURE TEST VALVE SHOP LUBRICATOR AND WELLBORE TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN(PASSING TEST). BLEED OFF ALL PRESSURE. PULL 5-1/8"FMC ISA BPV. RIG DOWN LUBRICATOR. CLOSE BLIND RAMS. NEW WELL BARRIERS: CEMENT PLUG,KWF, BOPS. 05:00 - 06:00 1.00 WHSUR P DECOMP RIG DOWN DUTCH RISER. 06:00 - 07:00 1.00 PULL P DECOMP RIG UP TO CIRCULATE OUT DIESEL FREEZE PROTECT FROM TUBING AND IA TO FLOWBACK TANK. 07:00 - 10:00 3.00 PULL P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT FROM WELL AS FOLLOWS: REVERSE CIRCULATE 75 BBLS 8.5 PPG SEAWATER INTO IA,TAKING RETURNS OUT TUBING TO FLOWBACK TANK;5 BPM,400-500 PSI. SWITCH OVER TO TUBING AND PUMP 35 BBL DEEP CLEAN(SOAP)PILL DOWN TUBING FOLLOWED BY 593 BBLS SEAWATER(1 SURFACE TO SURFACE VOLUME);6 BPM, 640-830 PSI. MONITOR WELL FOR 10 MIN AFTER CIRCULATING. WELL STATIC. 09:00-BLEED OFF 1500 PSI OA PRESSURE. 10:00 - 14:30 4.50 PULL P DECOMP RIG UP DOYON CASING TONGS,SLB SPOOLING UNIT AND SAFETY JOINT WITH FOSV IN PIPE SHED IN PREPARATION FOR PULLING 5-1/2"TUBING. LIFT BAKER SPEAR TO RIG FLOOR. 14:30 - 17:00 2.50 PULL P DECOMP RUN IN HOLE WITH SPEAR ASSEMBLY. TAG UP AT 53'MD. PICKUP TO VERIFY SPEAR ENGAGED IN TUBING. FMC REPRESENTATIVE ON LOCATION TO BACKOUT LOCKDOWN SCREWS ON TBG HANGER. 17:00 - 19:00 2.00 PULL P DECOMP PICKUP TO OFFSEAT HANGER WITH 180 KLBS. PULL HANGER TO RIG FLOOR. PICKUP WEIGHT=165 KLBS,SLACKOFF= 140 KLBS. MONITOR WELL FOR 10 MIN. WELL IS STATIC. LAYDOWN SPEAR ASSEMBLYAND TUBING HANGER. RIG UP TO CIRCULATE. 19:00 - 21:00 2.00 PULL P DECOMP CIRCULATE ONE BOTTOMS UP(387 BBLS)AT 400 GPM,250 PSI. SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN. WELL IS STATIC. SLOW PUMP RATES AT 8840'MD,8.5 PPG SEAWATER: MP#1: 30 SPM=26 PSI,40 SPM=26 PSI,50 SPM=35 PSI MP#2: 30 SPM=25 PSI,40 SPM=25 PSI,50 SPM=35 PSI 21:00 - 22:00 1.00 PULL P DECOMP BLOWDOWN TOP DRIVE AND CHANGEOUT ELEVATORS FROM BX TO YC SLIP TYPE FOR PULLING TUBING. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 9 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 8840'MD TO 8678'MD AT MIDNIGHT. SPOOL DUAL CONTROL LINES AND REMOVE 1 CONTROL LINE CLAMP PER JOINT. HOLD KICK WHILE TRIPPING DRILL WITH AAR. SECURE WELL PER STANDING ORDERS IN 2:30. 12/17/2012 00:00 - 05:30 5.50 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5.1/2",17#,N-80,A-B MOD 8RD TUBING FROM 8678'MD AT MIDNIGHT TO 6895'MD. SPOOL DUAL CONTROL LINES AND REMOVE 1 CONTROL LINE CLAMP PER EVERY OTHER JOINT. 00:30-BLEED OFF 1200 PSI OA PRESSURE. _ 05:30 - 07:30 2.00 PULL P •DECOMP HOLD KICK WHILE TRIPPING DRILL. SECURE WELL,THEN SIMULATE HYDRAULIC JACKING FORCE FROM WELL IS OVERCOMING ANNULAR PREVENTER HOLD OF TUBING. MAKEUP SAFETY JOINT AND PREPARE TO STRIP IN HOLE. CONDUCT AAR. LESSONS LEARNED INCLUDE HAVING MANUAL ELEVATORS ON RIG FLOOR FOR SAFETY JOINTAND HAVING 10'LIFTING SUB PUP JOINT ON TOP OF SAFETY JOINT IN PIPE BARN FOR HANDLING. 07:30 - 09:30 2.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 6895'MD TO 6653'MD(81 JOINTS),SPOOLING DUAL CONTROL LINES;AVERAGE-12-15 JOINTS PER HOUR. -2 STAINLESS STEEL BANDS RECOVERED FROM DIRECTLY UNDER TBG HGR. -41 RUBBER CLAMPS RECOVERED. 09:30 - 10:30 1.00 PULL P DECOMP RIG DOWN SLB AIR CONTROLLED SPOOLING UNIT. CONTROL LINES TESTED FOR NORM PRIOR TO REMOVAL FROM SITE. 10:30 - 13:30 3.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 6653'MD TO 5175'MD;AVERAGE 18 JOINTS PER HOUR WITH NO CONTROL LINES. MONITOR OPEN OA BLEED TO FLOWBACK TANK. NO CONTINUOUS FLOW FROM OA AND NO PRESSURE BUILDUP OBSERVED. 13:30 15:00 1.50 PULL P DECOMP HOLD KICK WHILE TRIPPING DRILL. SECURE WELL,THEN SIMULATE HYDRAULIC JACKING FORCE FROM WELL IS OVERCOMING ANNULAR PREVENTER HOLD OF TUBING. MAKEUP SAFETY JOINTAND PREPARE TO STRIP IN HOLE. CONDUCTAAR. 15:00 - 23:00 8.00 PULL P DECOMP PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 5175'MD TO 1100'MD;AVERAGE 19 JOINTS PER HOUR. MONITOR OPEN OA BLEED TO FLOWBACK TANK. NO CONTINUOUS FLOW FROM OA AND NO PRESSURE BUILDUP OBSERVED. Printed 2/25/2013 10:56:42AM ma eWdof61 forth America ALASKA B Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (tt)_ 23:00 - 23:30 0.50 PULL P DECOMP HOLD H2S RIG EVACUATION DRILL. DRILLER AND FLOORHAND SECURE THE WELLAND THEN JOINS ENTIRE RIG TEAM IN PRIMARY MUSTER AREA. CONDUCT AAR. 23:30 - 00:00 0.50 PULL P DECOMP LAYDOWN 5-1/2"TUBING FROM 1100'MD TO 750'MD. 12/18/2012 00:00 - 01:30 1.50 PULL P DECOMP _ PULL OUT OF HOLE WITH AND LAYDOWN 5-1/2",17#,N-80,A-B MOD 8RD TUBING FROM 750'MD AT MIDNIGHT TO SURFACE. -TOTAL RECOVERY OF 325 FULL JOINTS+1 SSSV ASSEMBLY(TBG PUP,OTIS FLOW COUPLING,OTIS RQY LANDING NIPPLE,OTIS FLOW COUPLING,TBG PUP) -CUT JOINT=29"LONG,FLARE OD=6.25" (SEE ATTACHED PICTURE) -ALL COMPLETION EQUIPMENT LABELED AND TESTED FOR NORM PRIOR TO REMOVAL FROM SITE. 01:30 - 02:00 0.50 PULL P DE?OMP RIG DOWN C_OYON CASING TONGS RIG FLOOR AFTER LAYING DOWN COMPLETION. 02:00 - 05:00 3.00 CLEAN - P DECOMP CHANGEOUT ELEVATORS TO HYDRAULIC BX ELEVATORS. RIG UP PS-21 HYDRAULIC SLIPS PAN LOAD HWD DDC IN PIPE BARN. 05:00 - 06:00 1.00 WHSUR P DECOMP INSTALL WEAR BUSHING,ID=8-7/8". DEVELOP PARKER PROCEDURE FOR RUNNING/PULLING WEAR BUSHING. 06:00 - 07:00 1.00 CLEAN P DECOMP MAKEUP 8-1/2"HUGHES VM-3 TRI-CONE BIT AND BIT SUB AS BHA FOR PICKING UP DRILLPIPE. 07:00 - 12:00 5.00 CLEAN P. DECOMP PICKUP AND SINGLE IN HOLE WITH 4",14#, S-135,HT38 DRILLPIPE FROM BHAAT 7'TO 955'MD. 12:00 - 13:30 1.50 CLEAN P DECOMP CREW CHANGEOUT. CLEAN MAGNETIC SENSOR ON TOP DRIVE LINK TILT ASSY. CALIBRATE FLOW SENSOR ON FLOW LINE. 13:30 - 15:00 1.50 CLEAN P DECOMP CONTINUE TO SINGLE IN HOLE WITH 4" DRILLPIPE FROM 955'MD TO 1429'MD. 15:00 - 15:30 0.50 CLEAN P DECOMP HOLD KICK WHILE TRIPPING(D-1)DRILLAND AAR WITH MASSIE CREW. 15:30 - 19:00 3.50 CLEAN P DECOMP SINGLE IN HOLE WITH 4"DRILLPIPE FROM 1492'MD TO 3042'MD. 96 TOTAL JOINTS PICKED UP. PU WEIGHT=93 KLBS, SLACKOFF=76 KLBS. 19:00 - 20:30 1.50 CLEAN P DECOMP CIRCULATE 2 BOTTOMS UP WHILE RECIPROCATING AND ROTATING STRING;60 RPM,500 FT-LBS TORQUE,200 SPM,846 GPM,1840 PSI. SLOW PUMP RATES AT 3042'MD,8.5 PPG SEAWATER: MP#1: 20 SPM=27 PSI,30 SPM=60 PSI,40 SPM=108 PSI MP#2: 20 SPM=27 PSI,30 SPM=57 PSI,40 SPM=103 PSI. Printed 2/25/2013 10:56:42AM 1 North America-ALASKA-BP Page 11 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 21:30 1.00 CLEAN P DECOMP HOLD AAR WITH RIG CREWS TO DISCUSS PICKING UP SINGLES AND TRIPPING IN HOLE. HOLD PRE-JOB SAFETY MEETING TO DISCUSS RACKING BACK PIPE IN DERRICK, FIRST OPERATIONS WITH IRON DERRICKMAN. 21:30 - 23:00 1.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BIT -ASSEMBLY FROM 3042'MD TO 1146'MD, RACKING BACK. 23:00 - 00:00 1.00 CLEAN P DECOMP HOLD WELL KILL(D-5)DRILL WITH MASSIE CREWAFTER SHUTTING IN WELL DURING SIMULATED KICK. APPLY 300 PSI TO WELLBORE AND PRACTICE CHOKE OPERATIONS; 12/19/2012 00:00 - 02:00 2.00 CLEAN P DECOMP CREW CHANGEOUT. DRAIN MUD-GAS SEPARATOR. RE-OPEN WELL AFTER WELL KILL DRILL WITH MASSIE CREW ON 12/18/12. RIG DOWN PS-21 HYDRAULIC SLIPS. 02:00 - 03:30 1.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BIT CLEANOUT BHA FROM 1146'MD TO SURFACE, RACKING BACK DRILLPIPE. BREAK OFF BIT AND BIT SUB. 03:30 - 04:30 1.00 CLEAN P DECOMP LOAD CLEANOUT ASSEMBLY TOOLS TO RIG FLOOR. BUILD SAFETY JOINT WITH CLOSED FOSV FOR UPCOMING NON-SHEARABLE OPERATIONS. 04:30 - 05:00 0.50 CLEAN P DECOMP HOLD AAR TO DISCUSS TRIPPING OUT OF HOLE WTH IRON DERRICKMAN AND PRE-JOB SAFETY MEETING FOR MAKING UP BHA 05:00 - 11:30 6.50 CLEAN P DECOMP MAKEUP 8-1/2"CLEANOUT ASSEMBLY AND RUN IN HOLE TO BHA OVERALL LENGTH OF 968'MD. 8-1/2"HUGHES VM-3 MILL TOOTH BIT -8-1/2"UPPER WATERMELON MILL WITH PORTED FLOAT -JARS,(9)6-1/2"SPIRAL DRILL COLLARS,(21) JTS 4"HWDP HOLD KICK WHILE TRIPPING DRILL AND AAR WITH BUCKLER'S CREW WHILE MAKING UP DRILL COLLARS(SHEARABLES ACROSS BOP STACK) 11:30 - 17:30 6.00 CLEAN P DECOMP TRIP IN THE HOLE WITH 8-1/2"CLEANOUT ASSEMBLY,PULLING STANDS FROM DERRICK,FROM BHAAT 968'MD TO 4000'MD. CALIBRATE BLOCK WEIGHT AND TOTCO DEPTH TRACKER WHILE TRIPPING IN ON STANDS. 17:30 - 19:30 2.00 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY WHILE PICKING UP 4"DRILLPIPE SINGLES,FROM 4000'MD TO 5000'MD. 19:30 - 20:00 0.50 CLEAN P DECOMP HOLD KICK WHILE TRIPPING DRILL AND AAR WITH MASSIE CREW. ADD COMPLEXITY OF LEAKING HYDRAULIC LINE BETWEEN ACCUMULATOR AND ANNULAR PREVENTER. Printed 2/25/2013 10:56:42AM -ALASKA-BP Page 12 of 61 • t. � Operation Summary Repo Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 CLEAN P DECOMP CONTINUE TO RUN IN HOLE WITH 8-1/2" CLEANOUT ASSEMBLY WHILE PICKING UP 4" DRILLPIPE SINGLES,FROM 4000'MD TO 7250' MD AT MIDNIGHT. HOLD MUD PUMP LINER AND SWAB CHANGEOUT PRACTICE RUN WITH DERRICKMAN AND ASSISTANT DRILLER TO ENSURE PROCEDURE ADEQUACY AND ALL TOOLS IN PLACE. 12/20/2012 00:00 - 03:00 3.00 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY WHILE PICKING UP 4"DRILLPIPE SINGLES,FROM 7250'MD AT MIDNIGHT TO TUBING STUB AT 8847'MD. SET DOWN WITH 5 KLBS TWICE TO CONFIRM DEPTH. PICKUP WEIGHT=190 KLBS,SLACKOFF=154 KLBS. 03:00 - 05:00 2.00 CLEAN P DECOMP PULL OUT OF HALE FROM 8847'MD TO 8557' MD. MAKE THREE PASSES ACROSS EZSV SET DEPTH(8480'MD)WITH 8-1/2" WATERMELON MILL,REAMING FULL STAND FROM 8557'MD TO 8462'MD(MILL 10'BEHIND BIT);60 RPM,407 GPM,1475 PSI 05:00 - 06:30 1.50 CLEAN P DECOMP RUN BACK IN HOLE FROM 8557'MD TO 1 STAND ABOVE TBG STUB AT 8744'MD. CIRCULATE AROUND 70 BBL HI-VIS SWEEP TO CIRCULATE HOLE CLEAN;606 GPM,2950 PSI. SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN TO CONFIRM NO FLOW PRIOR TO PULLING OFF BOTTOM. WELL IS STATIC. SLOW PUMP RATES AT 8744'MD,8.5 PPG: MP#1: 20 SPM=70 PSI,30 SPM=148 PSI,40 SPM=260 PSI MP#2: 20 SPM=66 PSI,30 SPM=150 PSI,40 SPM=260 PSI 06:30 - 07:30 1.00 CLEAN P DECOMP PERFORM PRACTICE CASING PRESSURE TEST WITH DRILLPIPE IN HOLE AS TEST RUN FOR PARKER"CASING AND LINER PRESSURE TEST'PROCEDURE. 07:30 - 08:00 0.50 CLEAN P DECOMP SERVICE TOP DRIVE 08:00 - 15:30 7.50 CLEAN P DECOMP PULL OUT OF THE HOLE,RACKING BACK 4" DRILLPIPE FROM 8744'MD TO 1632'MD. 15:30 - 16:30 1.00 CLEAN P DECOMP PERFORM KICK WHILE TRIPPING(D-1)DRILL WITH MASSIE CREWAND HOLD AAR. SIGNIFICANT NUMBER OF PERSONNEL IN RELIEF POSITIONS. ADD COMPLEXITY AND DISCUSSION ABOUT ANNULAR PREVENTER NOT FUNCTING 100%DUE TO NOT FULLY PUSHING REMOTE PANEL CONTROL BUTTON. 16:30 - 17:30 1.00 CLEAN P DECOMP PULL OUT OF HOLE,RACKING BACK 4" DRILLPIPE FROM 1632'MD TO BHAAT 968' MD. DERRICKMAN RUNNING IRON DERRICKMAN FROM DERRICK(VERSUS FROM RIG FLOOR). MONITOR WELL. WELL IS STATIC. 17:30 - 22:00 4.50 CLEAN P DECOMP TRIP IN HOLE ON 4"DRILLPIPE SINGLES WITH 8-1/2"CLEANOUT ASSEMBLY FROM 968' MD TO 3813'MD. TOTAL OF 113 STANDS OF DRILLPIPE NOW PICKED UP. Printed 2/25/2013 10:56:42AM forth America-ALASKA B ,Page 13 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 23:00 1.00 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEANOUT ASSEMBLY FROM 3813'MD TO 3212'MD, LAYING DOWN 4"DRILLPIPE SINGLES FOR COMPETENCY TEST. 23:00 - 00:00 1.00 CLEAN P DECOMP TRIP IN HOLE WITH 8-1/2"CLEANOUT ASSEMBLY FROM 3212'MD TO 3813'MD, PICKING UP 4"DRILLPIPE SINGLES. 12/21/2012 00:00 - 02:00 2.00 CLEAN P DECOMP HOLD WELL KILL(D5)DRILL WITH BUCKLER'S CREW. APPLY 400 PSI TO WELLBORE TO SIMULATE WELL INFLUX. PRACTICE LINEUP AND CHOKE OPERATIONS. 02:00 - 05:30 3.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEANOUT ASSEMBLY,RACKING BACK 4"DRILLPIPE AND 4"HWDP: FLOWCHECK WELLAT BHA. WELL STATIC. 05:30 - 07:30 2.00 CLEAN P DECOMP HOLD KICK WHILE TRIPPING DRILL WITH DRILL COLLARS ACROSS STACK TO PRACTICE CHANGING OUT ELEVATOR INSERTS REQUIRED FOR PICKING UP SAFETY JOINT. 07:30 - 08:30 1.00 CLEAN -P DECOMP LAYDOWN 8-1/2"CLEANOUTASSEMBLY. 08:30 - 14:00 5.50 DHB P DECOMP MIRU SCHLUMBERGER E-LINE UNIT. RIG UP WITH NO PRESSURE CONTROL,ONLY LINE WIPER. MAKEUP HALLIBURTON EZSV TOOLS. 14:00 - 16:30 2.50 DHB P DECOMP RUN IN HOLE WITH 9-5/8",47#HALLIBURTON EZSV ON E-LINE WITH GR/CCL TOOLS FROM SURFACE TO 8750'MD. LOG TIE-IN FROM 8750'MD TO 8650'MD. PICKUP TO 8496'MD. RIG CREW GREASE CHOKE MANIFOLD VALVES IN PREPARATION FOR BOP TEST. 16:30 - 17:00 0.50 DHB P DECOMP SET EZSV(EZ DRILL SVB SQUEEZE PACKER) WITH TOP AT 8496'MD,5'ABOVE COLLAR AT 8501'MD AND IN COMPETENT SAND. OVERALL LENGTH OF PLUG=36". EXPECTED WINDOW DEPTHS BASED ON EZSV SET DEPTH=8476'MD-8492'MD 17:00 - 18:00 1.00 DHB P DECOMP PULL OUT OF HOLE FROM 8496'MD SETTING DEPTH TO SURFACE WITH E-LINE. 18:00 - 19:30 1.50 DHB P DECOMP CLOSE BLIND RAMS AND PRESSURE TEST 9-5/8"CASING+EZSV PLUG AT 8496'MD TO 250 PSI LOW FOR FIVE MIN,3500 PSI HIGH FOR 30 MIN(PASSING TEST,SEE ATTACHED DOCUMENTATION). APPROVAL TO PROCEED WITH OPERATIONS GRANTED BY WELLS TEAM LEADER. 19:30 - 21:00 1.50 DI-IB P DECOMP RDMO SCHLUMBERGER E-LINE UNIT AND CLEAR RIG FLOOR. 21:00 - 23:30 2.50 BOPSUR P DECOMP DRAIN BOP STACK. RIG UP TO PRESSURE TEST BOPE. 23:30 - 00:00 0.50 WHSUR P DECOMP PULL WEAR BUSHING. 12/22/2012 00:00 - 01:00 1.00 BOPSUR P DECOMP RUN TEST JOINT WITH 13-3/8"TEST PLUG IN HOLE. FILL BOP STACKAND SURFACE i EQUIPMENT. Printed 2/25/2013 10:56:42AM fi } w IYft x Page 14 of 64, - m�ICB-ALASKA E� s Operation Summary Report\ , Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:00 - 10:00 9.00 BOPSUR P DECOMP PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE,JEFF JONES. -ALL BOPE TEST CHARTS AND REPORT ARE -ATTACHED.ALL PASSING TESTS. -ANNULAR PREVENTER AND VBRS TESTED WITH 4"TEST JOINT -(2)HT38 FOSVS,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. 10:00 - 11:00 1.00 BOPSUR P DECOMP PULL OUT AND LAYDOWN TEST JOINT WITH TEST PLUG. RIG DOWN AFTER BOPE TESTING. INSTALL WEAR RING,ID=8-7/8". 11:00 - 13:00 2.00 WHSUR P -DECOMP MAKEUP 8-1/2"SIMPLE BHAAND RUN IN HOLE TO BHA OAL 939'. -8-1/2"HUGHES VM3 MILLTOOTH. -3 STANDS OF 6-1/2"DC AND 7 STANDS OF HWDP. CONDUCT KICK WHILE TRIPPING DRILL.MU SHEARABLE SAFETY JT AND RIH. 13:00 - 14:00 1.00 WHSUR P DECOMP TIH FROM 939'MD TO 2078'MD. 14:00 - 15:00 1.00 WHSUR P DECOMP PERFORM D1 KICK WHILE TRIPPING DRILL AND AAR. CRITICAL TIME RESPONSE 2MIN 50SEC. 15:00 - 18:00 3.00 WHSUR P DECOMP TRIP IN HOLE FROM 2078'MD TO 4923'MD. 18:00 - 19:00 1.00 WHSUR N RREP 8,496.0 DECOMP IADC REPORT CODE 8. REPAIR RIG. TROUBLE SHOOT IRON DERRICKMAN. SIGNAL LOST BETWEEN PLC AND IRON DERRICKMAN REPEATER. 19:00 - 22:00 3.00 WHSUR P DECOMP TRIP IN HOLE FROM 4923'MD TO 8054'MD. P/U=177K,S/O=143K. 22:00 - 00:00 2.00 WHSUR P DECOMP MAKEUP AND RUN IN HOLE WITH 9-5/8",47#, L-80 HALLIBURTON RTTS STORM PACKER WITH 6-1/4"SUB-SURFACE CONTROL VALVE ON TOP. SET AT 51'MD,5'MD BELOW WELLHEAD. LAYDOWN RUNNING JOINT. 140 KLBS STRING WEIGHT HANGING BELOW RTTS. 12/23/2012 00:00 01:00 1.00 WHSUR P DECOMP PRESSURE TEST HALLIBURTON RTTS STORM PACKER FROM ABOVE TO 250 PSI LOWAND 2000 PSI HIGH FOR 5 MIN EACH (PASSING TEST,SEE ATTACHED CHART). 01:00 - 02:00 1.00 WHSUR P DECOMP PULL WEAR RING AND FLOW NIPPLE. DE-ENERGIZE ACCUMULATOR. PULL MOUSEHOLE. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 15 of 61 Operation Summary Report Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:00 2.00 WHSUR P DECOMP ENGAGE PULLING TOOL IN 9-5/8"PACKOFF. MARK JT AT RIG FLOOR TO MONITOR FOR CASING GROWTH. BACK OUT LOCK DOWN SCREWS.OBSERVE NO CSG GROWTH. BREAK BOP STACK AT TBG SPOOL. LIFT STACK. CONTINUE TO MONITOR OPEN OA FOR NO FLOW. NO FLOW OBSERVED DURING PACKOFF CHANGEOUT. BARRIERS WHLE CHANGING OUT PACKOFF WITH STACK NIPPLED DOWN: RESERVOIR- TESTED CSG&CEMENT PLUG,TESTED EZSV,KWF,TEST STORM PACKER. OUTER ANNULUS-STATIC COLUMN OF FLUID 04:00 - 06:00 2.00 WHSUR P DECOMP PICKUP ON PACKOFF PULLING TOOL WITH TOP DRIVE&BLOCKS TO 48 KLBS(13 KLBS OVERPULL)TO UNSEAT PACKOFF AND TUBING SPOOL. SET PACKOFF/SPOOL BACK DOWN ON CASING SPOOL. UNLATCH PULLING TOOL FROM PACKOFF AND LAYDOWN. MOVE BOP STACK TO SIDE ON BRIDGE CRANES. PULL OLD 9-5/8"PACKOFF AND FMC 13-5/8"5M TUBING SPOOL AND REMOVE FROM WELLHOUSE. 06:00 - 08:00 2.00 WHSUR P DECOMP INSTALL NEW 9-5/8"GEN-1 CASING PACKOFF AND RUN IN LOCKDOWN SCREWS. 08:00 - 10:30 2.50 WHSUR P DECOMP NIPPLE UP NEW FMC 13-5/8"5M TUBING SPOOL WITH 2-1/8"OUTLETS TO CASING SPOOL. 10:30 - 11:00 0.50 WHSUR P DECOMP FMC REPRESENTATIVE PRESSURE TEST PACKOFF TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 15 MIN(PASSING TEST, SEE ATTACHED CHARD. 11:00 - 13:30 2.50 BOPSUR P DECOMP NIPPLE UP 13-5/8"BOP STACK AND RISERS TO NEW TUBING SPOOL. CLEAN WELLHOUSE AND BOP DECK. PRESSURE TEST BOP BREAKS TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MIN EACH(PASSING TEST). 13:30 - 14:00 0.50 WHSUR P DECOMP INSTALL WEAR BUSHING,ID=8-7/8". RE-INSTALL MOUSEHOLE. 14:00 - 15:30 1.50 WHSUR P DECOMP HALLIBURTON REPRESENTATIVE ON LOCATION. RUN IN HOLE WITH FULL JOINT AND 15'PUP JOINT TO 51'MD. ENGAGE HALLIBURTON 9-5/8"RTTS. CLOSE ANNULAR PREVENTER. STRAIGHT PICKUP TO 176 KLBS TO RELEASE. NO PRESSURE OBSERVED BELOW PKR. OPEN ANNULAR PREVENTER. LAYDOWN RTTS TOOLS. 15:30 - 18:00 2.50 WHSUR P DECOMP RIG UP TO PRESSURE TEST NEW TUBING SPOOL. CLOSE UPPER PIPE RAMS ON 4" DRILLSTRING TO TEST AGAINST UPPER RAMS,EZSV AND 9-5/8"CASING. Printed 2/25/2013 10:56:42AM o fh A iI�I ICa ALASKA t5 Page 16 of61g ��. ..... Operation Summary Report's Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 18:00 - 19:30 1.50 WHSUR P DECOMP PRESSURE TEST NEW TUBING SPOOL AND BOP BREAKS TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN(PASSING TESTS, SEE ATTACHED CHART AND CRITERIA CALCULATOR). AUTHORIZATION TO PROCEED RECEIVED FROM WELLS TEAM LEADER. UPDATE TO BARRIERS IN WELL: TESTED CSG&CEMENT PLUG,TESTED EZSV,KWF, TEST BOPE,WELLHEAD ANNULAR VALVES. 19:30 - 00:00 4.50 WHSUR P DECOMP TRIP OUT OF THE HOLE FROM 8055'MD TO 1414'MD AT MIDNIGHT,RACKING BACK 4" DRILLPIPE. 12/24/2012 00:00 - 00:30 0.50 WHSUR P DECOMP PULL OUT OF HOLE FROM 1414'MD AT MIDNIGHT TO BHAAT 940'MD. FLOW CHECK ` WELL AT BHA. WELL IS STATIC. 00:30 - 01:30 1.00 WHSUR P DECOMP TRAIN ON IRON DERRICKMAN. DISCUSS UPCOMING BHA OPERATIONS 01:30 - 08:30 7.00 WHSUR N RREP 8,946.0 DECOMP IADC REPORT CODE 8 NPT: ATTEMPT TO TRIP OUT OF HOLE FROM BHAAT 940'MD. WHILE RACKING BACK STAND OF HWDP, IRON DERRICKMAN GRIPS CENTER UPSET ON JOINT OF HWDPAND LOCKS UP. MECHANICS AND ELECTRICIANS CALLED OUT TO TROUBLESHOOT. CHANGEOUT MAGNETIC SENSOR IN DERRICKMAN POWER SHOE. 08:30 - 11:30 3.00 WHSUR P DECOMP TRIP OUT OF THE HOLE FROM BHAAT 940' MD TO SURFACE,RACKING BACK ALL 7 STANDS HWDP AND TWO STANDS OF DRILL COLLARS. LAYDOWN LAST STAND OF DRILL COLLARS AS PRACTICE. BREAK BIT AND BIT SUB. 11:30 - 12:00 0.50 WHSUR P DECOMP SERVICE TOP DRIVE AND BLOCKS 12:00 - 16:00 4.00 WHSUR P DECOMP RIG CREW WORK WITH SCHLUMBERGER TO LOAD 9-5/8"1.5°BEND MUD MOTOR INTO PIPE BARN. SUCCESSFULLY PRACTICE LOADING MOTOR ONTO PIPE SKATE,LIFTING TO RIG FLOOR AND REMOVING FROM PIPE BARN. 16:00 - 18:00 2.00 WHSUR P DECOMP MAKEUP 8-1/2"SIMPLE BHA(SAME AS BHA JUST LAID DOWN)AND RUN IN HOLE TO OVERALL LENGTH OF 940'MD. BHA PICKUP WEIGHT=75 KLBS,SLACKOFF=75 KLBS. 18:00 - 00:00 6.00 WHSUR P DECOMP UNPIN IRON DERRICKMAN AND MOVE TO STORAGE POSITION. SECURE SAME AND RUN TOP DRIVE/BLOCKS PAST SEVERAL TIMES TO CONFIRM CLEARANCE. HOLDAAR WTH RIG CREW TO DISCUSS LESSONS LEARNED AND UPDATES TO PARKER WORK SAFE PROCEDURE. 12/25/2012 00:00 - 02:00 2.00 WHSUR P DECOMP RIG UP AND SECURE DERRICK BOARD TO PRACTICE TRIPPING WTH IRON DERRICKMAN IN STORAGE POSITION. 02:00 - 03:00 1.00 WHSUR P DECOMP TRIP IN HOLE WITH 8-1/2"SIMPLE BHA FROM 940'MD TO 2457'MD,TRIPPING IN WITH STANDS FROM DERRICK,NO IRON DERRICKMAN. Printed 2/25/2013 10:56:42AM North America-ALASKA lege i of 617 . •eration Summary Report. �.__,.tet, �. Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 03:30 0.50 WHSUR P DECOMP HOLD KICK WHILE TRIPPING(D-1)DRILLAND AFTER ACTION REVIEW. DISCUSS IMPORTANCE OF CLEAR ANNOUNCEMENTS, DILIGENCE WITH BOP OPERATIONS, PRIORITY OF SECURING WELL. 03:30 - 05:00 1.50 WHSUR P DECOMP RUN IN HOLE WITH 8-1/2"SIMPLE BHA FROM 2457'MD TO 3785'MD,TRIPPING IN WITH STANDS FROM DERRICK,NO IRON DERRICKMAN. FLOWCHECK WELL PRIOR TO TRIPPING OUT OF HOLE. WELL IS STATIC. 05:00 - 08:00 3.00 WHSUR P DECOMP PULL OUT OF HOLE FROM 3785'MD TO 940' MD WITH 8-1/2"SIMPLE BHA,RACKING BACK 4"DRILLPIPE,NO IRON DERRICKMAN. 08:00 - 12:00 4.00 WHSUR P DECOMP TRIP IN HOLE WITH 8-1/2"SIMPLE BIT BHA FROM 940'MD TO 3121'Mb,PICKING UP 4" DRILLPIPE SINGLES. TOTAL OF 136 STANDS 4"DRILLPIPE PICKED UP(12902'),SUFFICIENT QUANTITY TO TD PRODUCTION HOLE SECTION. 12:00 - 15:30 3.50 WHSUR P DECOMP TRIP IN HOLE FROM 3121'MD TO 6694'MD WITH 8-1/2"SIMPLE BHA,PULLING 2UL G 4" DRILLPIPE FROM DERRICK,NO IRON DERRICKMAN. FLOW CHECK WELL FOR 10 MIN PRIOR TO PULLING OUT OF HOLE. WELL IS STATIC. 15:30 - 16:00 0.50`. WHSUR P DECOMP PULL OUT OF HOLE FROM 6694'MD TO 5777' MD WITH 8-1/2"SIMPLE BHA,RACKING BACK 4"DRILLPIPE,NO IRON DERRICKMAN. 16:00 - 16:30 0.50 WHSURP DECOMP HOLD KICK WHILE TRIPPING DRILLAND AAR WITH RIG CREW. 16:30 - 18:00 1.50 WHSUR P DECOMP MOVE IRON DERRICKMAN FROM STORAGE POSITION TO WELL CENTER FOR USE. PIN TO SECURE AND PREPARE FOR USE DURING TRIPPING. 18:00 - 00:00 6.00 WHSUR N WAIT 8,496.0 DECOMP DURING FUNCTION TEST,AFTER RE-PINNING IRON DERRICKMAN,SMALL METAL OBJECT FELL FROM DERRICK TO RIG FLOOR. SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITOR WELL. HOLD INVESTIGATION AND PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. CLEAR OTHER MATERIALS OUT OF DERRICK, RANGING FROM SCREWS TO WELDING RODS. LOAD 7"LINER INTO PIPE SHED. 12/26/2012 00:00 - 04:00 4.00 WHSUR N WAIT 8,496.0 DECOMP SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITOR WELL. PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. CLEAR OTHER MATERIALS OUT OF DERRICK,RANGING FROM SCREWS TO WELDING RODS. CLEAN PITS IN PREPARATION FOR TAKING — ON 10.4 PPG LSND MUD. Printed 2/25/2013 10:56:42AM olRreri 'a'-ALASKA t� k is Page/8of61 , • Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00.00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 04:30 0.50 WHSUR P DECOMP HOLD RIG EVACUATION DRILL WITH KING'S CREWANDAAR. RETURN TO RIG AND HOLD TABLETOP DRILL TO REVIEW PARKER WORK SAFE PROCEDURE. FUNCTION TEST ALARMS WITH PERSONNEL STAGED AROUND RIG TO DETERMINE LOCATIONS WHERE ALARM IS DIFFICULT TO HEAR(NO SIRENS OUTSIDE RIG,ONLY GAI-TRONICS ALARM). -MOTOR ROOM,EXTERIOR FRONT SIDE OF RIG,ON TOP OF MUD MODULE. 04:30 - 06:30 2.00 WHSUR N WAIT 8,496.0 DECOMP SAFETY STAND DOWN FOR DROPPED OBJECT-MAINTAIN CONTINUOUS HOLE FILL TO MONITQR WELL. PERFORM COMPLETE DERRICK INSPECTION WITH RIG CREW. UNABLE TO FIND SOURCE OF METAL OBJECT THAT FELL. RIG LEADERSHIP TEAM DECISIONS TO PROCEED AHEAD WITH OPERATIONS AFTER NOT FINDINGANY SOURCE OF DROPPED OBJECT DURING DERRICK INSPECTIONS. 06:30 - 08:00 1.50 WHSUR P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BHA FROM 5777'MD TO 5682'MD,RACKING BACK 4"DRILLPIPE. 08:00 - 19:00 11.00 WHSUR N RREP 8,496.0 DECOMP IADC REPORT CODE 8 NPT: TROUBLESHOOT IRON DERRICKMAN. UNABLE TO FUNCTION POWERSHOE. ELECTRICIANS DISCOVER LOOSE FITTING. TIGHTEN FITTING AND IRON DERRICKMAN BEGINS TO WORK AGAIN. 19:00 - 22:30 3.50 WHSUR P DECOMP PULL OUT OF THE HOLE FROM 5777'MD TO BHAAT 939'MD,RACKING BACK4" DRILLPIPE. FLOWCHECK WELL AT BHA. WELL IS STATIC. 22:30 - 23:00 0.50 WHSUR P DECOMP HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL BY BLEEDING FLUID FROM INACTIVE PIT INTO TRIP TANK. SECURE WELL IN 02:45. DISCUSS LESSONS LEARNED IN AAR WITH RIG CREW. 23:00 - 00:00 1.00 WHSUR P DECOMP PULL OUT OF HOLE FROM 1414'MD TO DRILL COLLARS AT 324'MD. 12/27/2012 00:00 - 00:30 0.50 WHSUR P DECOMP PULL OUT OF HOLE WITH 8-1/2"SIMPLE BHA FROM COLLARS AT 324'MD TO LAST STAND OF COLLARS AT 136'MD. 00:30 - 02:00 1.50 WHSUR P DECOMP HOLD KICK WHILE TRIPPING DRILL(D-1) WITH COLLARS ACROSS BOP STACK PICKUP SAFETY JOINT WITH CLOSED FOSV AND STAB. HOLD AAR WITH RIG CREW. -BACK OUT AND LAY DOWN SAFETY JOINT TO PIPESHED. 02:00 - 03:00 1.00 WHSUR P DECOMP RACK BACK LAST STAND OF 6-1/4"STEEL SPIRAL DRILL COLLARS. BREAK 8-1/2"MILL TOOTH BIT FROM BIT SUB. **14:35-24 HR NOTIFICATION PROVIDED TO AOGCC OF PENDING BOP TEST** ACKNOWLEDGMENT RETURNED VIA EMAIL BY AOGCC REPRESENTATIVE CHARLES SCHEVE AT 14:40 HRS 03:00 - 04:30 1.50 STWHIP P WEXIT LOAD WHIPSTOCK INTO PIPESHED,STAGE MILLING TOOLS TO THE RIG FLOOR. Printed 2/25/2013 10:56:42AM ram, • : e 19 of 611 tal Ica-ALASKA- Page p•erakion Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 09:30 5.00 STWHIP P WEXIT MAKEUP 9-5/8"BAKER WHIPSTOCK/MILLING x BHAAND ORIENT TO MWD. \ (d -TOTAL BHA LENGTH 1038'MD. h -9-5/8"BAKER GEN II WHIPSTOCK SLIDE AND ANCHOR ASSEMBLY(PINNED FOR 22 KLBS) Y \0 -8-1/2"WINDOW MILL(PINNED TO v( WHIPSTOCK FOR 46 KLBS SHEAR OFF) 8-3/8"LOWER WATERMELON MILL,DUAL 8-1/2"UPPER WATERMELON MILLS -PORTED FLOAT SUB,MWD TOOLS 09:30 - 10:30 1.00 STWHIP P WEXIT SHALLOW TEST SCHLUMBERGER MWD TOOL. -480 GPM;320 PSI TEST UNSUCCESSFUL DUE TO ELECTRICAL INTERFERENCE.REROUTE CABLE. -LEAK ON RETURN DUMP TO RESERVE PIT #3 10:30 - 12:00 1.50 STWHIP P WEXIT CONTINUE TO RIH WITH WHIPSTOCK/MILLING BHA 3 STANDS 6-1/4"STEEL COLLARS,7 STANDS 4"HWDPTO1016'MD 12:00 - 13:30 1.50 STWHIP P WEXIT 1016'MD,MAKE UP TOP DRIVE TO EST CIRCULATION AND SHALLOW TEST MWD. -ACHIEVE SUCCESSFUL MWD TEST AFTER REROUTING MWD BOOT CABLE. -550 GPM,880 PSI,130 SPM -P/U=85K,S/O=85K 13:30 - 21:30 8.00 STWHIP_; P WEXIT CONTINUE RIH FROM 1016'T/8438'MD. -P/U=187K,S/O=154K -FILL DP EACH 2500' -DIPLACEMENTS CORRECT,TRIP GOOD. 21:30 - 22:00 0.50 STWHIP- P WEXIT MAKE UP TOP DRIVE,EST CIRCULATION. -OBTAIN SPR'S AT 8438'MD,7377'TVD WITH 8.5 PPG SEAWATER -MUD PUMP#1 AT 2 BPM=67 PSI,3 BPM= 138 PSI,4 BPM=246 PSI -MUD PUMP#2 AT 2 BPM=62 PSI,3 BPM= 137 PSI,4 BPM=240 PSI ESTABLISH CIRCULATION RATE -130 SPM,550 GPM,2350 PSI -P/U=187K,S/O=154K Printed 2/25/2013 10:56.42AM North America-ALASKA-BP Page 20 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 00:00 2.00 STWHIP P WEXIT ORIENT TOOL FACE AT 45L,WASH DOWN FROM 6438'TO 8496'MD. -130 SPM,550 GPM,2350 PSI. -P/U=187K,S/O=154K. DID NOT TAG EZSV AT PROPOSED WIRELINE DEPTH 8496'MD -VERIFY PIPE COUNT IN DERRICKAND PIPESHED ARE CORRECT,VERIFY PIPE TALLY AND BHA STRAP ARE CORRECT.NO DISCREPANCIES FOUND. -CONTINUE DOWN TO 8512',STILL NO INDICATION OF EZSV,CONSULT WITH ODE AND GAIN'APPROVAL TO CONTINUE INTO HOLE TO TAG EZSV. -TAG UP AT 8532'.36-FT..PAST INITIAL WIRELINE MEASURMENT OF EZSV AT 8496' P/U=187K,S/O 154K -VERIFY TOOLFACE ORIENTATION 42 LEFT, SLACK OFF AND-SET BOTTOM ANCHOR WITH 20K DOWN.P/U TO 190KAND CONFIRM ANCHOR IS SET.SLACK OFF TO 117K AND SHEAR OFF SLIDE WITH 45K DOWN.P/U TO VERIFY SHEARED. TOP OF WHIPSTOCK 8511'MD.7443'TVD • RACK BACK STAND#80 TO 8505'MD,P/U= 183k 12/28/2012 00:00 - 01:30 1.50 STWHIP P WEXIT MAKEUP TOP DRIVE.HOLD PJSM WITH RIG TEAM AND CHM2H TRUCK DRIVERS ON UPCOMING DISPLACEMENT. -OFF LOAD SEAWATER FROM RESERVE PITS, • STAGE WEIGHT UP MATERIAL IN PITS. 01:30 - 03:00 1.50 STWHIP P WEXIT DISPLACE WELL FROM 8.5 PPG SEAWATER TO 10.2 PPG LSND MILLING FLUID AT TOP OF WHIPSTOCK 8511'MD.TVD 7443' -ICP 1175 PSI,450 GPM-FCP 1700 PSI,450 GPM -P/U 178K,S/O 152K. MW IN 10.2 PPG,MW OUT 10.2 PPG MONITOR WELL,STATIC 03:00 - 04:00 1.00 STWHIP P WEXIT CIRCULATE AND CONDITION MUD.CONTINUE TO MOVE SEAWATER TO TRUCKS -MOVE ALL AVAILBLE MUD TO ACTIVE PIT#1 OBTAIN SPR'S 8511'MD,TVD 7443',MW 10.2 PPG -MUD PUMP#1 AT 2 BPM=320 PSI,3 BPM= 400 PSI,4 BPM=505 PSI -MUD PUMP#2 AT 2 BPM=316 PSI,3 BPM= 407 PSI,4 BPM=512 PSI 04:00 - 04:30 0.50 STWHIP P WEXIT HOLD AAR WITH RIG TEAM ON DISPLACEMENT. 04:30 - 07:00 2.50 STWHIP P WEXIT WELL KILL DRILL(D5) -SHUT IN WELL PER STANDING ORDERS TO DRILLER UTILIZING ANNULAR PREVENTER, FILL ALL LINES,GAS BUSTER AND CHOKE. -ESTABLISH SLOW CIRCULATION RATES -FOCUS ON WELL CONTROL TRAINING AND SIMULATE CHOKE BEHAVIOR. 07:00 - 07:30 0.50 STWHIP P WEXIT WEIGHT UP ACTIVE PIT TO 10.4 PPG. -BLOW DOWN CHOKE MANIFOLD. -SERVICE TOP DRIVE Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 21 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 10:00 2.50 STWHIP P WEXIT CIRCULATE AND CONDITION MUD UNTIL 10.4 PPG IN AND OUT OF HOLE. -RECIPROCATE DRILL PIPE FROM 8513'T/ 8485'MD -450 GPM,1733 PSI -P/U 175K,S/O 153K 10:00 - 12:00 2.00 STWHIP P WEXIT SPUD 02-12D WELLBORE AT 10:00 ON 1�\ 12/28/2013 i ' • �? BEGIN MILLING 9-5/8"CASING WINDOW FROM 8511'TO 8513'MD f1 -500 GPM,2047 PSI ON,2014 PSI OFF r� -RPM 90,TRQ ON 6K,TRQ OFF 5K,WOB 1-5K -P/U 175K,'S/O 153',RTW 157K -MW IN 10.4 PPG,MW OUT 10.4 PPG 12:00 - 13:30 1.50 STWHIP P WEXIT INVESTIGATE SUSPICIOUS VIBRATIONAL NOISE FROM TOP DRIVE. -MONITOR WELL,STATIC -RACK BACK ONE STAND -INSPECT AND CHECK ALL HYDRAULIC AND FLUID LEVELS IN TOP DRIVE NO ABNORMALITIES FOUND,RESUME OPERATIONS 13:30 - 21:00 7.50 STWHIP P WEXIT CONTINUE MILLING WINDOW FROM 8513'TO 8528'MD -503 GPM,119 SPM,2040 PSI ON,2020 PSI OFF. -120 RPM,TRQ ON 6-11K,TRQ OFF 6K. -P/U 175K,S/0 153K,RTW 163K -MW IN 10.4 PPG,MW OUT 10.4 PPG "17:00-HRS:20-GAL LSND MILLING FLUID LEAK FROM PROCESS PIT INTO AGITATOR ROOM DUE TO TROUGH BEING OVERFILLED. ALL FLUD WITHIN CONFINES OF THE RIG. NECESSARY NOTIFICATION MADE. -PENDING NOTIFICATION OF BOPE TEST PROVIDED TO AOGCC AT 17:12-HRS 17:33-HRS ACKNOWLEDGMENT RETURNED VIA EMAIL BY AOGCC REPRESENTATIVE CHARLES SCHEVE WAIVING WITNESS OF BOPE TEST 21:00 - 21:30 0.50 STWHIP P WEXIT CIRCULATE 1 BOTTOMS UP TO INSPECT FLOW PADDLE. -FLOW PADDLE NOT READING PROPER RETURN FLOW PERCENT,SUSPECTED CALIBRATION ERROR. -503 GPM,119 SPM,2040 PSI. -ROTATE AND RECIPROCATE DURING CIRCULATION 120 RPM,TO 8K -P/U 175K,S/O 153K,RTW 163K Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 22 of 61 Operation Summary Report ,, •,•,• • , Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time'11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 -Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:30 - 00:00 2.50 STWHIP N RREP 8,528.0 WEXIT IADC REPORT CODE 8 NPT: WHILE PERFORMING INSPECTIONS AND SPCC WALK AROUND LEAK DISCOVERED. LEAK DUE TO FAILED AIR-BOOTS ON DRILLING RISER CAUSING 5-GAL DRILLING FLUID TO LEAK TO CELLAR DECK AREA.ALL FLUID WITHIN CONFINES OF THE RIG.PROPER NOTIFICATIONS MADE TO#5700 AND UNIT AREA AUTHORITY. PJSM AND JSA WITH RIG TEAM,FOR NON-ROUTINE TASK OF CHANGING AIR-BOOTS -REMOVE FAILED AIR-BOOTS AND REPLACE WITH NEW. -MW IN 10.4 PPG,MW OUT 10.4 PPG 12/29/2012 00:00 - 01:00 1.00 STWHIP N RREP 8,528.0 WEXIT IADC REPORT CODE 8 NPT:CONTINUE WITH INSTALL OF NEVI/AIR-BOOTS IN DRILLING RISER. -MAKE UP DRILLING RISER,FILL HOLE AND INSPECT FOR LEAKS. -FINALIZE ADJUSTMENTS ON FLOW RETURN SENSOR. -MW IN 10.4 PPG,MW OUT 10.4 PPG OA PRESSURE AT 05:00-HRS=1000-PSI, BLEED DOWN TO 500-PSI 01:00 - 07:00 6.00 STWHIP, P WEXIT MILL WINDOWAND DRILL NEW HOLE FROM 8528'TO 8545'MD -500 GPM,119 SPM,2130 PSI ON,2100 PSI OFF. -120 RPM,TRQ ON 6-10K,TRQ OFF 6K. -P/U 175K,S/O 153K,RTW 163K,WOB 22 8534'AND 8544'MD PUMP 40 BBL SWEEP OBSERVE AN INCREASE OF-50%METAL CUTTINGS INCREASE SEEN AT THE SHAKERS WHEN SWEEP IS AT SURFACE. -MW IN 10.4 PPG,MW OUT 10.4 PPG 07:00 - 08:30 1.50 STWHIP P WEXIT CIRCUALTE HOLE CLEAN AT 8545'MD FOR UPCOMING LOT AND POOH -ROTATE AND RECIPROCATE THROUGHOUT CIRCULATION. -500 GPM,119 SPM,2100 PSI. -120 RPM,6K TRQ WORK THOROUGH WINDOW SEVERAL TIMES WITH AND WITHOUT PUMPS AND ROTATION VERIFY CLEAN PASSAGE THROUGH WINDOW WITHOUT OBSTRUCTIONS. -MW IN 10.4 PPG,MW OUT 1.0.4 PPG 08:30 - 10:00 1.50 STWHIP P WEXIT PERFORM LOT '.P J --FLOW CHECl(WELL 10 MIN,(WELL STATIC). PULL INTO 9-5/8"CASING -DEPTH 8520'MD,ND 7450' -MW 10.4 PPG IN,10.4 PPG OUT -LOT=12.29 EMW.WITH LEAK OFF PRESSURE OF 734 PSI AUTHORIZATION TO PROCEED RECEIVED FROM ODE* 10:00 - 12:00 2.00 STWHIP P WEXIT POOH FROM 8520'TO 6,992'MD -P/U 152K,S/O 136K Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 23 of 61 O•eration Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 15:30 3.50 STWHIP P WEXIT 6992'MONITOR WELL(STATIC) - 6992'TO 4716'POOH,30 FPM MONITORING DISPLACEMENT FOR ANY DISCREPANCIES. TRIP VOLUMES CORRECT. -P/U 156K,S/O 135K -MW 10.4 PPG IN,10.4 PPG OUT. 15:30 - 17:00 1.50 STWHIP P WEXIT 4716'MONITOR WELL(STATIC)CIRCULATE 1 BOTTOMS UP 70 SPM,296 GPM,600 PSI -RECIPROCATE 30 RPM,2K TRQ -P/U 130K,5/0 118K,RTW 123K 17:00 - 21:00 4.00 STWHIP P WEXIT MONITOR WELL(STATIC)CONTINUE TO POOH FROM 4716'TO 2629'MD P/U 120K,5/O,105K 21:00 - 22:30 1.50 STWHIP P WEXIT 2629'MD MONITOR WELL(STATIC) -PJSM FOR SETTING RTTS PACKER AND BOPE TEST. -MAKEUP AND RUN IN HOLE WITH 9-5/8",47#, L-80 HES RTTS STORM PACKER WITH 6-1/4" SUB-SURFACE CONTROL VALVE ON TOP.SET AT 45'MD BELOW WELLHEAD. LAYDOWN RUNNING TOOL. 17 STANDS WITH 84 KLBS STRING WEIGHT HANGING BELOW RTTS. -PRESSURE TEST RTTS STORM PACKER FROM ABOVE TO 250 PSI LOW,1000 PSI HIGH FOR 5 MIN EACH(TEST PASS) 22:30 - 23:00 0.50 STWHIP P WEXIT PULL WEAR RING AND DRAIN STACK. -RU BOP TEST EQUIPMENT. 23:00 - 00:00 1.00 STWHIP P WEXIT SET TEST PLUG AND BEGIN PRESSURE TESTING BOPE TO 250 PSI LOW/3500 PSI HIGH FOR FIVE MIN EACH ALL IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. -STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE,CHUCK SCHEVE VIA EMAIL FRIDAY,DECEMBER 28, 2012 17:33 HRS. 12/30/2012 00:00 - 07:00 7.00 STWHIP P WEXIT CONTINUE WITH WEEKLY PRESSURE TESTING OF BOPE TO 250 PSI LOW/3500 PSI HIGH,FIVE CHARTED MINUTES EACH TEST. ALL IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. -STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE,CHUCK SCHEVE VIA EMAIL FRIDAY,DECEMBER 28, 2012 17:33 HRS. TEST WITNESSED:WSL RICK DOLFI,WILL TURNER AND JR RIG MANAGER DANIEL BLYDENBURGH. -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED. ALL TESTS PASSING. -ANNULAR PREVENTER AND VBR'S TESTED WITH 4"TEST JOINT -(2)HT38 FOSV'S,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. - ALL CLOSURE TIMES FOR BOP COMPONENTS RECORDED. -ALL COMPONENTS FUNCTIONED FROM LER CAB PANEL,RIG MANAGERS OFFICE REMOTE PANEL AND AT ACCUMULATOR. Printed 2/25/2013 10.56.42AM North America-ALASKA-BP Page 24 of 61!` Operation Summary Report Common Well Name:02-12 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date 12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud DateTme:11/25/1977 12:00:00AM Rig Release.2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) _ 07:00 - 08:30 1.50 STWHIP P WEXIT RIG DOWN BOPE TEST EQUIPMENT. -BLOW CHOKE MANIFOLD,KILL LINE AND CHOKE LINE -INSTALL WEAR RING AND RUN IN LOCK DOWNS(OD=8.875") 08:30 - 09:00 0.50 STWHIP P WEXIT CLEAR RIG FLOOR. PJSM WITH RIG TEAM AND HALLIBURTON(HES)PACKER REP.FOR PULLING RTTS AND LAYING DOWN. 09:00 - 10:00 1.00 STWHIP P WEXIT MAKE UP HES RETRIVIAL RUNNING TOOL. RUN IN HOLE WITH FULL STAND. ENGAGE HALLIBURTON 9-5/8"RTTS. CLOSE ANNULAR PREVENTER.RELEASE RTTS WITH 100K P/U. NO PRESSURE OBSERVED BELOW RTTS. OPEN ANNULAR PREVENTER. MONITOR WELL 10-MIN(STATIC). POOH ONE STAND, LAY DOWN RTTS TOOLS. "WELLBORE BARRIERS:10.4 PPG KWF, WELLHEAD ANNULAR VALVES,TESTED BOPE 10:00 - 11:00 1.00 STWHIP P WEXIT POOH FROM 2728'TO 2629' -P/U 100K,5/0 100K MW IN 10.4 PPG,MW OUT 10.4 PPG LAY DOWN RTTS,MONITOR WELL(STATIC) 11:00 - 12:00 1.00 STWHIP P WEXIT CONTINUE TO POOH WITH MILLING BHA FROM 2629'TO 2250' -P/U 95K,S/O 95K TRIP GOOD,HOLE TAKING CORRECT FILL DURING TRIP -MW IN 10.4 PPG,MW OUT 10.4 PPG 12:00 - 14:00 2.00 STWHIP P WEXIT POOH FROM 2250'TO 1016' -P/U 96K,5/0 96K -MONITOR WELL(STATIC) AT LAST STAND OF DP. -DISCUSS NON-SHEARABLE EQUIPMENT ACROSS BOP'S. 14:00 - 17:30 3.50 STWHIP P WEXIT MONITOR WELL 10-MIN(STATIC). STAND BACK HWDP,LAY DOWN STEEL COLLARS, MWD AND BAKER MILLING BHA FROM 1016' TO SURFACE. ALL MILLS IN GAUGE WITH NO DEFICIENCIES. DISCUSS NON-SHEARABLE EQUIPMENTACROSS BOP'S PRIOR TO BHA HANDLING. 17:30 - 18:30 1.00 STWHIP P WEXIT CLEAN AND CLEAR RIG FLOOR. LAY DOWN BAKER MILLS AND EQUIP. 18:30 - 19:30 1.00 STWHIP P WEXIT FUNCTION ALL RAM PREVENTER'S AND RINSE.MAKE UP TOP DRIVE TO STAND AND RIH WITH PORTED SUB FOR FLUSHING BOP STACK. FLUSH STACK PUMPING WHILE ROTATING AND RECIPROCATING PAST RAM CAVITIES. BLOW DOWN TOP DRIVE AND ALL LINES.ENSURE ALL WELL CONTROL EQUIP. LINES AND VALVES ARE LINED UP ACCORDINGLY. 19:30 - 20:00 0.50 STWHIP P WEXIT VISUAL INSPECTION,SERVICE,GREASE AND ADD OIL TO TOP DRIVE. Printed 2/25/2013 10:56.42AM North America-ALASKA-BP Page 25 of 61 Operation Summary Report Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 --Rig-Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 DRILL P WEXIT PJSM WITH RIG TEAM AND SCHLUMBERGER ON 8-1/2"INTER.DRILLING BHA HANDLING. DISCUSS WELLBORE BARRIERS, NON-SHEARABLE COMPONENTS AND LENGTHS TO WHICH SAFETY SHEAR JOINT WOULD BE REQUIRED.VERIFY ALL FOSV'S, XO'S, SHEAR JOINT AND LIFTING EQUIPMENT IS PROPERLY AVAIABLE. PICK UP 6-3/4"XP MUD MOTOR.ARC,8-1/2"ILS STAB. MAKE UP 8-1/2"RE-RUN DTX619M BIT, PICK UP MWD,SCRIBE AND ORIENT MWD TO MOTOR. CONTINUE TO PICK UP 7"NMFC AND HWDP TO 277'MD 12/31/2012 00:00 - 01:00 1.00 STWHIP P WEXIT CONTINUE TO RIH WITH 4"HWDP FROM 274' TO 953'MD. 01:00 - 01:30 0.50 STWHIP P WEXIT MAKE UP TD SHALLOW TEST MWD/LWD TOOLS -550 GPM,118 SPM,TEST GOOD. BLOW DOWN TOP DRIVE. LINE UP TO TRIP TANK. 01:30 - 06:00 4.50 STW-lIP P WEXIT RIH WITH DRILL PIPE FROM 953'TO 3500'MD. FILL DP EVERY 20 STANDS. DISPLACEMENT CORRECT DURING TRIP. -MW IN 10.4 PPG,MW OUT 10.4 PPG. **WELLBORE BARRIERS:10.4 PPG KWF, WELLHEAD ANNULAR VALVES,TESTED BOPE 06:00 - 07:00 1.00 STWHIPP WEXIT CONTINUE RIH FROM 3500'TO 4684'MD.FILL EACH 20 STANDS. DISPLACEMENTS CORRECT. 07:00 - 08:00 1.00 STWHIP P WEXIT 4684'MD,CIRCULATE AND CONDITION MUD, WHILE INSTALLING PS-21 SLIPS. RECIPROCATE DP AND CIRCULATE 10.4 PPG IN AND OUT. -390 GPM,1190 PSI, 08:00 - 08:30 0.50 STWHIP P WEXIT BLOW DOWN TOP DRIVE. MAKE UP HYDRAULIC LINES TO PS-21 SLIPS. 08:30 - 12:00 3.50 STWHIP P WEXIT CONTINUE RIH FROM 4684'TO 7525'MD.FILL EVERY 20 STANDS.DISPLACEMENTS CORRECT DURING TRIP -MW IN 10.4 PPG,MW OUT 10.4 PPG -P/U 146K,S/O 131K 12:00 - 13:00 1.00 STWHIP P WEXIT MONITOR WELL(STATIC). CONTINUE RIH FROM 7525'TO 8226'MD. -P/U 153K,S/O 136K 13:00 - 16:00 3.00 STWHIP P WEXIT CIRCULATE AND CONDITION MUD AT 8226' MD.LINE UP ON PITS ON ACTIVE MUD SYSTEM TO BE USED WHILE DRILLING. ACTIVE PITS INCLUDE PROCESS PITS#1-5, AND ACTIVE PIT#1. STAGE UP PUMP RATES TO 142 SPM,600 GPM,3500 PSI. -P/U 159K,5/0 143K BRING ALL MUD CLEANING EQUIPMENT ONLINE. VERIFY VOLUMES ARE COMPARATIVE TOA BBL IN VERSUS BBL OUT. OBTAIN SPR'S SPR'S AT8226'MD/ND 7443' MW 10.4 PPG -MP#1 AT 2 BPM=379 PSI, 3 BPM=498 PSI. 4 BPM=630 PSI -MP#2 AT 2 BPM=377 PSI, 3 BPM=486 PSI, 4 BPM=616 PSI Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 26 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING.CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 17:00 1.00 STWHIP P WEXIT MAD PASS LOG FROM 8226'TO 8511'MD. 330 FPM WITH NO PUMP -P/U 159K,S/O 143K 17:00 - 18:30 1.50 STWHIP P WEXIT ORIENT 45 LEFT.SLACK OFF PAST TOP OF WHIPSTOCKAT 8511'MD WITH NO PUMP. WINDOW LOOKS CLEAN NO ISSUES. STAGE UP PUMPS AT 8533' -550 GPM,130 SPM,3600 PSI,OBTAIN BASELINE ECD 10.84. MW 10.4,VIS 45 -P/U 168K,S/O 148K 18:30 - 00:00 5.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 8545' TO 8657'MD. -550 GPM,,130 SPM,3800 PSI ON,3750 PSI OFF -40 RPM,TRQ ON 8K,TRQ OFF 6K -P/U 175K,S/O 148K,RTW 156K -MW IN 10.4 PPG,MW OUT 10.4 PPG -ADT=3.36,AST=2.85,ART=0.51 -TOTAL BIT HRS 3.36,TOTAL JARS HRS=3.36 SPR'S AT 8510'MD/7443'TVD, MW 10.4 PPG -MP#1 AT 2 BPM=379 PSI, 3 BPM=498 PSI, 4 BPM=630 PSI -MP#2 AT 2 BPM=377 PSI, 3 BPM=486 PSI, 4 BPM=616 PSI 1/1/2013 00:00 - 03:00 3.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 8657' TO 8792'MD. -550 GPM, 130 SPM, 4130 PSI ON, 3850 PSI OFF -40 RPM, TRQ ON 8K, TRQ OFF 6K -P/U 175K, S/O 148K, RTW 156K -MW IN 10.4 PPG,MW OUT 10.4 PPG 03:00 - 03:30 0.50 DRILL P INTI OBTAIN SPR'S 8792'MD, 7681'ND, MW 10.4 PPG MP#1 AT 2 BPM=390, 3 BPM=500, 4 BPM= 650 PSI MP#2 AT 2 BPM=390, 3 BPM=490, 4 BPM= 640 PSI 02:45-LEAK DUE TO FROZEN AUGER CHUTE TO CUTTINGS BOX. NOTIFY 5700, SUPERINTENDENTAND UNITAREA AUTHORITY OF MUD LEAK OUTSIDE CONFINES OF THE CUTTINGS BOX.EST. 25-GAL LSND MUD.CLEAN AREA, TROUBLESHOOT AND REMOVE ICE PLUG FROM AUGER CHUTE.MAINTAIN ADEQUATE STEAM PRESSURE TO CHUTE ELIMINATING REOCCURRENCE. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 27 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date 12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:30 1.00 DRILL P INTI CONTINUE TO DRILL FROM 8792'TO 8805'MD -550 GPM,130 SPM,4130 PSI ON,3850 PSI OFF -40 RPM,TRQ ON 8K,TRQ OFF 6K -P/U 175K,S/O 148K,RTW 156K -AST=0.92, ART=0.99, ADT=1.91, TOTAL BIT=5.31, TOTAL JAR=5.3 MW IN 10.4 PPG,MW OUT 10.4 PPG 8805'-FT,DIFFICULTY DRILLING,ABNORMAL PRESSURE SPIKES. RUBBER OBSERVED ACROSS SHAKERS,APPEARING TO BE STATOR MATERIAL FROM INTERNAL COMPONENTS OF DRILL MOTOR. FLOW CHECK WELL'10-MIN(STATIC). PREPARE FOR TRIP TO INSPECT BHAAND CHANGE MOTOR. 04:30 - 05:00 0.50 DRILL N DFAL 8,805.0 INTI WORK DRILL STRING RECIPROCATING FROM 8805'-8788'MD. CONFIRM WITH ODE ON PLAN FORWARD.PJSM FOR TRIP OUT OF HOLE TO INSPECT BHAAND CHANGE - MOTOR. •05:00 - 05:30 0.50 DRILL N DFAL 8,805.0' INTI FLOW CHECK WELL 10-MIN(STATIC). BLOW DOWN TOP DRIVE. LINE UP ON TRIP TANK. MW IN 10.4 PPG, MW OUT 10.4 PPG. 05:30 - 07:30 2.00 DRILL ' N DFAL 8,805.0 INTI PULL OUT OF HOLE FROM 8805'TO 8506'MD. P/U=174K, S/O=155K, NO OVERPULLS INTO CASING, WINDOW LOOKS GOOD NO ISSUES.DISPLACEMENTS CORRECT,NO SWABBING OBSERVED. 8506'MD FLOW CHECK WELL 10-MIN AT 9-5/8"CASING WINDOW (STATIC). 07:30 - 12:00 4.50 DRILL N DFAL 8,805.0 INTI CONTINUE TO POOH FROM 8506'TO 3957' MD.TRIP LOOKS GOOD. DISPLACEMENTS CORRECT. P/U=114K, S/O=110K 12:00 - 15:00 3.00 DRILL N DFAL 8,805.0 INTI POOH FROM 3957'TO 921'MD. P/U=85K, 5/0=109K. FLOW CHECK WELL AT LAST STAND OF DRILL-PIPE PRIOR TO HWDP. IDENTIFY NON-SHEARABLE EQUIP.PRIOR TO BHA.ENSURE SHEAR-JOINT AVAILABLE PER PROCEDURE 15:00 - 17:30 2.50 DRILL N DFAL 8,805.0 INTI PJSM-BHA HANDLING.STAND BACK HWDP AND COLLARS IN DERRICK. LD MWD,ARC AND FAILED MUD MOTOR. BIT GRADED: 1-1-PN-T-X-I-CT-DMF. BIT HAD 5 OF 6 NOZZLES PLUGGED WITH RUBBER MATERIAL FROM STATOR IN MOTOR. REMOVE DEBRIS FROM NOZZLES.CHANGE OUT MOTOR.NO ADDITIONAL ANOMALIES • VISUALLY OBSERVED.FLOW CHECK WELL THROUGHOUT BHA HANDLING.. 17:30 - 18:30 1.00 DRILL N DFAL 8,805.0 INTI CLEAN AND CLEAR FLOOR. DOWNLOAD MWD,ARC AND PROGRAM TO RE-RUN. 18:30 - 19:00 0.50 DRILL N DFAL 8,805.0 INTI SERVICE TOP DRIVE,BLOCKS AND CROWN WHILE MWD/ARC ARE PROGRAMED 19:00 - 22:00 3.00 DRILL N DFAL 8,805.0 INTI MAKE UP 8-1/2"INTERMEDIATE BHA#8. PU NEW 675 MUD MOTOR AND MAKE UP MWD, ARC AND RE-RUN BIT.RIH WITH FLEX COLLARS,HWDP TO 922'MD. P/U=70K, S/O=70K Printed 2/25/2013 10:56 42AM North America-ALASKA-BP Page 28 of 61 Operation Summary Report - Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 --Rig-Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release 2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:00 - 22:30 0.50 DRILL N DFAL 8,805.0 INTI 922'MD,MU TOP DRIVE. SHALLOW TEST MWD,ARC -100 SPM, 423 GPM, 810 PSI.TEST GOOD. BLOW DOWN TOP DRIVE. LINE UP ON TRIP TANK. 22:30 - 00:00 1.50 DRILL N DFAL 8,805.0 INTI RUN IN HOLE FROM 922'TO 1966'MD. P/U= 85K, S/O=85K -MW IN 10.4 PPG,MW OUT 10.4 PPG **WELLBORE BARRIERS REMAIN AS:10.4 PPG KWF,WELLHEAD ANNULAR VALVES, TESTED BOPE. 1/2/2013 00:00 - 03:30 3.50 DRILL N DFAL 8,805.0 INTI CONTINUE TO RIH WITH 8-1/2" INTERMEDIATE DRILLING. FROM 1966'TO 4230'MD 03:30 - 04:00 0.50 DRILL P INTI EXECUTE UNANNOUNCED FIRE DRILL WITH RIG TEAM. SECURE WELL PER WSP.WELL SECURE IN 1-MIN 38-SECONDS. ALL 3RD PART AND RIG TEAM ACCOUNTED FOR. RESPONSE WITHIN ACCEPTABLE TIMEFRAME OF 3-MIN. HOLD AAR AND DOCUMENT AREAS FOR IMPROVEMENTS TO SAFETY AND EFFICIENCY DURING FIRE DRILL. 04:00 - 08 00 4.00 DRILL N DFAL 8,805.0. INTI CONTINUE TO RIH FROM 4230'10 TOP OF WINDOW 8511'MD ALL DISPLACEMENTS CORRECT. FLOW CHECK WELL AT WINDOW(STATIC) -P/U 168K,5/0 146K. - MW IN 10.4 PPG,MW OUT 10.4 PPG. 08:00 - 10:00 2.00 DRILL N DFAL 8,805.0 INTI MU TOP DRIVE, FILL DP AND BREAK CIRCUALTION STAGING UP PUMPS -50 SPM,250 GPM=775 PSI. 130 SPM,550 GPM=2970 PSI. ORIENT TO 45L TO PASS THROUGH WINDOW. 10:00 - 11:00 1.00 DRILL N DFAL 8,805.0 INTI RIH PAST TOP OF WINDOWAT 8511'INTO 8-1/2"OPEN HOLE TO 8805'MD. WINDOW CLEAN,NO ISSUES WITH TRIP IN HOLE. NO FILL ON BOTTOM - P/U=168K, S/O=148K 11:00 - 12:00 1.00 DRILL P INTI STAGE UP PUMPS AND ESTABLISH DRILLING RATES.OBTAIN NEW SPR'S. DRILL FROM 8805 TO 8850'MD 130 SPM, 550 GPM, 3310 PSI ON, 3100 PSI OFF. RPM 60,TQ ON 7K, TQ OFF 6K,WOB 8K MW IN 10.4 PPG, MW OUT 10.4 PPG ART=0.49, AST=0, ADT=0.49, TOTAL BIT 0.49, TOTAL JARS 5.8 12:00 - 00:00 12.00 DRILL P INTI DRILL FROM 8850'TO 9510'MD -600 GPM, 4050 PSI ON, 3950 PSI OFF. -RPM 100, TRQ ON 9K, TRQ OFF 7K, -P/U 186K, S/0 157K, RTW 165K -MW IN 10.4 PPG, MW OUT 10.4 PPG. ADT=8.01, ART=4.58, AST=3.43, TOTAL BIT 8.01, TOTAL JARS 13.8 Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 29 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/3/2013 00:00 - 02:30 2.50 DRILL P INTI DRILL FROM 9510'TO 9692'MD. TD CALLED PER GEO AT 9692'-MD, 8449'TVD -130 SPM, 550 GPM, 3770 PSI ON, 3450 PSI OFF. -RPM 100, TQ ON 8.5K, TRQ OFF 7.5K -P/U 188K, 5/0 157K, RTW 165K MW IN 10.4 PPG, MW OUT 10.4 PPG AST=0.25, ART=0.81, ADT=1.06, JAR HR =14.7, TOTAL BIT=9.43 02:30 - 05:30 3.00 DRILL P INTI 9692'MD-CIRCULATE HOLE CLEAN AND CONDITION FOR WIPER TRIP. -ROTATE AND RECIPROCATE DP 60 RPM FROM 9692'TO 9640'MD -PUMP 3 BOTTOMS UP, ECD WITHIN 0.3 CALCULATED -550 GPM, 3420 PSI, TQ 6K -CALC ECD=10.6, ACTUAL ECD=10.9. MW IN 10.4 PPG,MW OUT 10.4 PPG. 05:30 - 06:00 0.50 DRILL P INTI OBTAIN SPR'S, FLOW CHECK WELL 10-MIN (STATIC) -PREPARE FOR TRIP OUT OF HOLE. 06:00 - 07:30 1.50 DRILL P INTI POOH,PUMPING WITH NO ROTATION FROM 9692'TO 9366' -2 BPM,310 PSI, P/U 190K, S/0 159K. OBSERVE PACKING OFF WITH INCREASE IN DIFFERENTIAL TO 90-120 PSI. 07:30 - 08:00 0.50 DRILL P INTI RIH ON ELEVATORS FROM 9366'TO 9651'MD. -P/U 192K, S/O 157K MW IN 10.4 PPG, MW OUT 10.4 PPG. 08:00 - 12:00 4.00 DRILL P INTI MU TOP-DRIVE. BREAK CIRCULATION STAGGING UP PUMPS. -BACK REAM POOH FROM 9651'TO 8702'MD -130 SPM, 550 GPM, 3120 PSI, 100 RPM,TO 7K -P/U 182K, S/O 153K, RTW 152K 12:00 - 13:00 1.00 DRILL P INTI CONTINUE TO BACKREAM POOH FROM 8702' TO 8506'MD -550 GPM, 3400 PSI, 100 RPM, TQ 6K -P/U 172, 5/0 146K, RTW 156K. -FLOW CHECK WELL 10-MIN AT 8506'MD (STATIC) 13:00 - 15:00 2.00 DRILL P INTI CIRCULATE 1.5 BOTTOMS UP. RECIPROCATE 8506'TO 8417' -600 GPM, 3700 PSI, 120 RPM, 7K TQ, -P/U 172K, S/O 146K, RTW 147K 15:00 - 16:00 1.00 DRILL P INTI FLOW CHECK WELL(STATIC). RIH FROM 8506'TO 8986' -P/U 180K, S/O 150K 16:00 - 19:30 3.50 DRILL N RREP 9,692.0 INTI IADC REPORT CODE 8 NPT-CHANGE OUT MALFUNCTIONING BX ELEVATORS.NOT CLOSING PROPERLY. -CIRCULATE FROM 8986'TO 8892'WHILE MOBILIZING REPLACEMENTS TO RIG FLOOR. -120 SPM, 550 GPM, 3300 PSI, -P/U 180K, S/O 150K, RTW 160K 19:30 - 20:00 0.50 DRILL P INTI RIH FROM 8986'TO 9651'MD -P/U 180K, S/O 150K. TRIP LOOKS GOOD. NO FILL ON BOTTOM. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 30 of 61 0,',oration Summa Re.ort Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 DRILL P INTI CIRCULATE AND CONDITION HOLE CLEAN. ROTATE RECIPROCATE. -130 SPM, 550 GPM, 3450 PSI, 120 RPM, 6K TQ - 4 -PUMP 40 BBL SWEEP SURFACE TO SURFACE. CIRCULATE 4 BOTTOMS UP TOTAL. PUMP LAST BU WITH 80-RPM,MW IN -10.5, MW OUT 10.5. NO ADDITIONAL SHALE OBSERVED AT SHAKERS. HOLE APPEARS CLEAN. FLOW CHECK WELL 10 MIN(STATIC) 1/4/2013 00:00 - 02:00 2.00 DRILL P INTI PUMP POOH,NO ROTATE FROM 9692'TO ABOVE HRZAT 9209'MD -7 SPM,3/4-BPM 250 PSI. NO OVERPULLS OR SWABBING OBSERVED. HOLE LOOKS GOOD. - P/U 191K, S/O 160K-MW IN 10.5, MW OUT 10.5 PPG 02:00 - 03:00 1.00 DRILL P INTI CONTINUE TO PUMP POOH FROM 9271'TO 9176'MD. STAND 88, 9271-FT RELEASE 2.4"-OD DRIFT DOWN DRILL-PIPE FOR UPCOMING LINER/CEMENT JOB.- P/U 188K, S/O 150K. 03:00 - 04:30 1.50 DRILL P INTI CONTINUE TO POOH ON ELEVATORS FROM 9176'TO ABOVE 9-5/8"WINDOW AT 8511'MD. NO OVERPULLS,OPEN-HOLE LOOKS GOOD. MONITOR WELL AT WINDOW(STATIC).- P/U 188K, S/O 150K 04:30 - 06:00 1.50 DRILL.... P INTI PUMP DRY JOB, BLOW DOWN TOP DRIVE. POOH ON ELEVATORS FROM 8410'TO 8000' MD. DISPLACEMENTS CORRECT.- P/U 174K, S/O 142K 06:00 - 11:30 5.50 DRILL P INTI CONTINUE POOH FROM 8000 TO 922'. FLOW CHECK WELL 10-MIN AT BHA/HWDP(STATIC)- P/U 70K, S/O 70K. MW IN 10.5, MW OUT 10.5 PPG 11:30 - 12:00 0.50 DRILL P INTI CONTINUE TO MONITOR WELL,INSTALL --- BLEEDER BYPASS FOR CEMENT WASH UP LINE. CLEAN AND CLEAR FLOOR. PJSM TO LD BHA. 12:00 - 12:30 0.50 DRILL P INTI 922'REMOVE PS-21 SLIPS,INSTALL MASTER ROTARY BUSHING'S FOR BHA HANDLING. ENSURE NON-SHEARABLE JOINT IN POSITION INCASE NEEDED. 12:30 - 16:00 3.50 DRILL P INTI STAND BACK 7-STANDS 4"HWDP. LAY DOWN COLLARS,MWD/LWD TOOLS.BREAK BIT AND LAY DOWN MOTOR. BIT GRADED: 1-3-BT-A-X-1-CT-TD. NO VISUALANOMILIES OBSERVED WITH BHA. ALL STABILIZERS WITHIN GAUGE. 16:00 - 17:00 1.00 DRILL P INTI CLEAN AND CLEAR RIG FLOOR OF ALL BHA TOOLS. 17:00 - 19:30 2.50 DRILL P INTI PERFORM TEST RUN AND RIG UP WITH BAKER TD CEMENT HEAD.TORQUE ALL LOOSE NC50 CONNECTIONS. HOLD AAR AND FINALIZE ALL UPDATES TO WSP. LAY DOWN CEMENT HEAD TO PIPE-BARN. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 31 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:30 - 20:30 1.00 BOPSUR P INTI DRAIN BOP STACK TO BELOW BLIND RAMS. LINE UP TO PUMP DOWN THE KILL LINE TAKING RETURNS THROUGH THE MGS. ESTABLISH CIRCULATION TO MONITOR WELL CONTINUOUSLY. 14-BBLS TOTAL TO FILL LINES AND MGS. CHANGE OUT UPPER PIPE RAMS FROM 2-7/8"x 5"TO 7-IN. 20:30 - 22:00 1.50 CASING P INTI RIG UP EQUIPMENT FOR RUNNING 7-IN, 26-LB/FT L-80 LINER. 22:00 - 22:30 0.50 CASING P INTI PICKUP 7-IN TEST JOINT TO FLOOR.RIG UP AND PULL WEAR RING. 22:30 - 00:00 1.50 CASING P INTI DRAIN BOP STACK. MAKE UP TEST PLUG TO 7-IN TEST JOINT. RIH AND SET TEST PLUG. FILL STACK. PRESSURE TEST UPPER PIPE RAMS. 250 PSI LOW, 3500 PSI HIGH. EACH TEST 5 CHARTED MINUTES.TEST PASSING. SEE ATTACHED CHART. 1/5/2013 00:00 - 04:30 4.50 CASING P INTI PULL TEST PLUG AND RIG DOWN 7-IN TEST JOINT. DRAiN'BOP STACK. BLOW DOWN KILL AND CHOKE LINE.MONITOR WELL CONTINUOUSLY WITH HOLE FILL NO GAIN, NO LOSS. MAKE UP NC50 x VAM 1 CROSSOVER TO FOSV. RIG UP AND CONFIGURE PS-21 SLIPS TO 7-IN. MAKE UP FLUID FILL UP LINE OFF MUD MANIFOLD FOR FILLING LINER. RIG UP DOUBLE STACK TONGS. STAGE CENTRALIZER AND BAKER EQUIPMENT TO RIG FLOOR. -WELLBORE BARRIERS:TESTED BOPE,10.5 PPG KWF. 04:30 - 06:00 1.50 CASING P INTI PJSM ON RUNNING 7-IN,26-LB/FT,L-80 LINER. BAKERLOK SHOE TRACK(BTC) TORQUE TO 6,700-FT/LBS.FILL LINER AND CHECK FLOATS(GOOD)CONTINUE TO RIH TO 288-FT. P/U 43K, S/0 42K 06:00 - 08:30 2.50 CASING P INTI CONTINUE TO RIH PER PROGRAM WITH 7-IN, 26-LB/FT, L-80,LINER FROM 288'TO 1319' MD. APPLY JET LUBE SEAL GUARD TO ALL VAM TOP CONNECTIONS,TORQUE TURN TO 11,950-FT/LBS.FILL EACH JOINT AND TOP OFF EACH 10-JOINTS.DISPLACEMENTS CORRECT. P/U 68K, 8/0 68K. MW IN 10.5 PPG, MW OUT 10.5 PPG 08:30 - 10:00 1.50 CASING P INTI LAY DOWN 7-IN SINGLE JOINT ELEVATORS, INSTALL BX ELEVATORS WITH 4"HANDLING INSERTS,CHANGE OUT PS-21 SLIP SEGMENTS FROM 7"TO 5". MAKE UP XO AND 5.13-FT,4-IN DRILL-PIPE PUP TO TOP OF LINER HANGER. PU BAKER WIPER PLUG AND LINER HANGER ASSEMBLY AND MAKE UP TO STRING. FLOW CHECK WELL WHILE CHANGING ELEVATORS.(STATIC) "09:30 PROVIDE AOGCC 24-HR NOTIFICATION OF PENDING BOPE TEST. **AOGCC REPRESENTATIVE LOU GRIMALDI REPLIES VIA EMAIL WAIVING WITNESS OF WEEKLY BOPE TEST. Printed 2/25/2013 10:56.42AM North America-ALASKA-BP Page 32 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 11:00 1.00 CASING P INTI 1356-FT. WHILE MIXING AND PLACING PAL MIX INTO LINER HANGER RESERVOIR. CIRCULATE 1.5x LINER VOLUME.75-BBL TOTAL,4 BPM,170 GPM,98 PSI.NO LOSSES DURING CIRCULATION. 11:00 - 12:00 1.00 CASING P INTI MAKE UP 20.06-FT,4-IN DRILL-PIPE PUP. PICK UP FIRST STAND OF 4-IN DRILL-PIPE. LAY DOWN FIRST 2-JOINTS OF STAND FOR CORRECT SPACE OUT WHEN ON BOTTOM AT TD 9260'MD 12:00 - 16:30 4.50 CASING P INTI CONTINUE TO RIH WITH 7-IN LINER ON 4-IN DP FROM 1383'TO 4167-FT. FILL EVERY 10-STANDS. P/U 103K, S/O 100K, MW IN 10.5 PPG, MW OUT 10.5 PPG. 16:30 - 17:30 1.00 CASING P INTI 4,167-FT,CIRCULATE BOTTOMS UP. 6 BPM, ICP 340 PSI, FCP 400 PSI. P/U 103K, S/O 100K 17:30 - 23:00 5.50 CASING P INTI RIH WITH 7-IN LINER FROM 4167 TO 8436-FT, P/U 167K,S/O 131K. MONITOR AND RECORD P/U AND S/O WEIGHTS EVERY 1000-FT. 23:00 - 00:00 1.00 CASING P INTI 8436-FT,CIRCULATE SURFACE TO SURFACE VOLUME ABOVE 9-5/8"WINDOW. STAGE UP PUMPS WHILE MONITORING FOR LOSSES. -2 BPM=270 PSI, 2.5 BPM=308 PSI, 3 BPM =337 PSI, 3.5 BPM=372 PSI, 4 BPM=415 PSI, 5 BPM=600 PSI, 6 BPM=705. 6 BPM= 15%RETURN FLOW WITH NO LOSS. MW IN 10.5 PPG, MW OUT 10.5 PPG.- RECIPROCATE STRING DURING CIRCULATION. P/U 162K, S/O 137K. RT WEIGHT PUMPS ON 147K, 6K TRQ, 20 RPM. RT WEIGHT WITH PUMP OFF 150K, 7K TRQ, 20 RPM. 1/6/2013 16:00 - 17:00 1.00 CASING P INTI LINE UP TO SLB CEMENTERS. PUMP 30-BBL 11.5-PPG MUD PUSH, 57.3-BBL'S CLASS-G 15.8 PPG CEMENT,5-BPM. CHASE WITH 10-BBL H2O. DROP WIPER PLUG,BRING SLB ONLINE TO PUMP AND DISPLACE. OBSERVE WIPER PLUG TRANSITION PAST INDICATOR ON CMT HEAD.DISPLACE 0.3-BBL AND EXPERIENCE PRESSURE INCREASE TO 3,500-PSI NOTE: MINIMUM CEMENT DENSITY RECORDED=15.59 PPG,MAXIMUM=15.71 PPG ON SLB METER. 00:00 - 02:00 2.00 CASING P INTI 8,436-FT,CONTINUE TO CIRCULATE SURFACE TO SURFACE VOLUME ABOVE 9-5/8"WINDOW. STAGE UP PUMPS,NO LOSSES DURING CIRCUALTION. 3-BPM=370 PSI, 4-BPM=450 PSI, 5-BPM= 530 PSI, 6-BPM=705 P/U 167K, S/O 136K, RTW 146K, TQ 6K, 20 RPM. ROTATE WEIGHT NO PUMP 150K, 20 RPM, TQ 7K. MW IN 10.5 PPG, MW OUT 10.5 PPG. 02:00 - 02:30 0.50 CASING P INTI 8,436-FT,OBTAIN SPR'S. FLOW CHECK WELL 10-MIN(STATIC) Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 33 of 61 Operation Summary Report Common Well Name:02-12 AFE No • Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Datemme:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 03:30 1.00 CASING P INTI CONTINUE TO RIH FROM 8,436'TO 8,911-FT WITH LINER ON 4"DRILL-PIPE. FILL DP EVERY 10 STANDS. MAINTAIN CONSTANT FILL ACROSS TOP OF HOLE. NO LOSSES. 03:30 - 05:00 1.50 CASING P INTI 8,911-FT,2-STANDS ABOVE HRZ,CIRCULATE 2 STANDS DOWN TO 9,100-FT. STAGE PUMP UP SLOWLY AND CIRCULATE - FOR 10 MINUTES. 5 BPM, 585 PSI. PUMPING 5 BPM=15%RETURN FLOW WITH NO LOSSES. 05:00 - 06:00 1.00 CASING P INTI RIH FROM 9,100'TO 9,670-FT. FILL EACH 10 STANDS.DISPLACEMENT CORRECT WITH NO LOSSES. P/U 193K, S/O 135K. 06:00 - 06:30 0.50 CASING P INTI PU BAKER TD;CEMENT HEAD,MU SWING, CEMENT HOSE, 31.57-FT SINGLE IN MOUSE HOLE. MU TO TOP-DRIVE AND STRING. 06:30 - 11:30 5.00 CASING P INTI RIH,WASH DOWN WITH SINGLE JOINT DP,TAG ON DEPTH 9,692-FT(TD). TAG 24.5-FT IN ON SINGLE. LINE UP TO CIRCULATE THROUGH CEMENT LINE. PU TO PLACE LINER ON DEPTH 9,690-FT. STAGE PUMP UP IN 0.5-BPM INCREMENTS AND ESTABLISH CIRC. 1-BPM=295 PSI, 2-BPM=355 PSI, 3-BPM= 420 PSI, 4-BPM=520 PSI, 5-BPM=602 PSI, 6-BPM=880 PSI. 16%RETURN FLOWAT 6-BPM. NO LOSSES THROUGHOUT CIRCULATION. P/U 200K, S/0 140K 11:30 - 12:00 0.50 CASING P INTI PRESSURE TEST CEMENT LINE,CEMENT HEAD 350-PSI LOW, 4,500-PSI HIGH 5-MIN EACH TEST. TEST IS LEAK TIGHT. 11:40 CREW CHANGE OUT,WAIT FOR FRESH CREW TO BEGIN INITIAL CEMENT JOB. BLOW DOWN TOP-DRIVE AND KILL LINE 12:00 - 16:00 4.00 CASING P INTI CIRCULATE AND CONDITION MUD. • RECIPROCATE AFTER STAGE UP TO 6-BPM, 830 PSI. NO LOSSES DURING CIRCUALTION. MW IN 10.4-PPG P/U 196K, S/O 142K 14:00-HRS BEGIN BATCH UP CEMENT. CONTINUE TO CIRCULATE 2,750 BBL TOTAL. 15:40-HRS MUD PUSH BATCHED UP,BATCH UP TAIL. 17:00 - 18:00 1.00 CASING N CEMT 9,690.0 INTI BLOW DOWN CEMENT LINE AND LOW PRESSURE MUD LINE TO SLB TRUCK.LD CEMENT HEAD AND TROUBLESHOOT PRESSURE SPIKE.WIPER DART FOUND IN XO OF TD CEMENT HEAD. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 34 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 20:00 2.00 CASING N CEMT 9,690.0 INTI DROP NEW WIPER PLUG AND PLACE LINER ON DEPTH 9,690-FT. LINE UP TO RIG AND BEGIN TO DISPLACE CEMENT. OBSERVE CATCHING CEMENT AT 430-STROKES (43.3-BBLS). OBSERVE WIPER PLUG PRESSURE UP AT 816-STROKES(81.6-BBLS PUMPED).CALCULATED LATCH AT 856-STROKES(85.6-BBL'S) PRESSURE INCREASE TO 4,500-PSI.CYCLE PRESSURE 3 x TO 4,500-PSI WITH NO SUCCESS,SWAP TO SLB CEMENTERS PRESSURE 1 x TO 5,000-PSI WITH SLB.(NO SUCCESS). BLOW DOWN CEMENTERS, CONTACT ODE AND SUPERINTENDENT TO INFORM OF UNSUCCESSFUL DISPLACEMENT. PROCEED WITH EMERGENCY RELEASE OFF 7-IN LINER. LINER SHOE DEPTH 9,692-FT. LINER TOP 8,341-FT NOTE: SEE INFORMATION ABOUT TOC ON 1/12/13 DAILY REPORT(USIT LOGGING). 20:00 - 22:00 2.00 CASING N CEMT 9,690.0 INTI PICK UP ABOVE LINER TOP WITH RUNNING TOOL. FLOW CHECK WELL FOR 30-MIN. (STATIC). OUT OF CRITICAL PATH WHILE MONITORING WELL,BREAK OUT,FLUSH AND LD CEMENT HEAD. BLOW DOWN TD. 22:00 - 00:00 2.00 CASING P INTI POOH FROM 8,339'TO 6,896-FT WITH 4-IN DP AND LINER RUNNING TOOL. MW IN 10.4 PPG, MW OUT 10.5 PPG DISPLACEMENTS CORRECT. P/U 125K, S/O 112K 1/7/2013 00:00 - 01:30 1.50 CEMT P INTI CONTINUE TO POOH ON ELEVATORS FROM 6,896'TO 5,946-FT. DISPLACEMENTS CORRECT. MW IN 10.4 PPG, MW OUT 10.4 PPG. 01:30 - 02:00 0.50 CEMT P INTI SERVICE TOP DRIVE AND TRAVELING EQUIPMENT WHILE MONITORING WELL. (STATIC) 02:00 - 03:30 1.50 CEMT P INTI CONTINUE TO POOH ON ELEVATORS FROM 5,946'TO 4,435-FT. DISPLACEMENTS CORRECT. MW IN 10.4 PPG, MW OUT 10.4 PPG. PUW 100K,SOW 100K 03:30 - 04:00 0.50 CEMT P INTI MOVE 7 STDS OF 4-IN HWDP FROM DS TO ODS RACK. 04:00 - 08:00 4.00 CEMT P INTI CONTINUED POOH ON ELEVATORS FROM 4,435'TO BHA. FLOW CHECK WELL FOR 10 MIN.PRIOR TO PULLING BHA INTO BOP STACK. WELL STATIC. PUW 75K,SOW 75K 08:00 - 10:30 2.50 CEMT P INTI LD STAND 3 DUE TO CEMENT CONTAMINATION, PU TWO SINGLES FROM SHED THAT WERE ORIGINALLY LD FOR SPACE OUT AND LANDING 7-IN LINER ON DEPTH. REPLACE SINGLES BACK IN STRING TO MAKE UP STAND 1 AND RACK IN DERRICK. 10:30 - 11:30 1.00 CEMT P INTI LD BAKER 7-IN LINER RUNNING TOOL. WIPER PLUG FOUND IN UPPER XO TO RUNNING TOOL.REMOVE WIPER PLUG. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 35 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 11:30 - 13:00 1.50 CEMT P r INTI CONTINUE TO FLOW CHECK WELL WHILE CLEANING AND CLEARING RIG FLOOR. LD RUNNING TOOL OFF FLOOR. WELL STATIC. 13:00 - 14:30 1.50 EVAL N CEMT 9,690.0 INTI RU AND PERFORM INJECTIVITY TEST ON 7-IN x 9-5/8-IN LINER LAP AND RECORD.(REFER TO ATTACHED CHART). PUMP AT 5-SPM (1/2-BPM) NOTED INJECTIVITY AT 26-STROKES,970-PSI. PUMP TOTAL OF 76-STROKES(7.5-BBLS). FINAL PRESSURE 947-PSI.HOLD FOR 10-MIN. BLED TO 850-PSI. BLED OFF TO TRIP TANK TOTAL OF 4 BBLS. 3.5-BBL'S INJECTED. 14:30 - 15:00 0.50 BOPSUR P INTI PJSM FOR`,CHANGING UPPER PIPE RAMS. MONITOR WE.L(STATIC) 15:00 - 16:00 1.00 BOPSUR P INTI CONTINUE TO MONITOR WELL WHILE RU TO TEST BOPE. PUMP OUT BOP STACK TO BELOW UPPER PIPE RAMS. FOR CONSTANT OBSERVATION OF WELL,CLOSE BLIND RAMS,LINEUP KILL AND CHOKE LINES, CIRCULATE ACROSS HOLE THROUGH CHOKE.(NO PVT CHANGE). 16:00 - 17:30 1.50 BOPSUR P INTI CHANGE BOP UPPER PIPE RAMS FROM 7-IN TO 2-7/8 x 5 1/2-IN VARIABLES. SINCE RAM DOORS WERE OPENED INSTALL NEW TOP RAM DOOR SEALS,PRECAUTION ONLY(NO VISIBLE DAMAGE OR FAILURE). -WELLBORE BARRIERS FOR RAM CHANGE: 10.4-PPG KWF,WELLHEAD ANNULAR VALVES,CLOSED BLIND/SHEAR RAMS. 17:30 - 22:00 4.50 BOPSUR P INTI PUMP OUT BOP STACK. FUNCTION ALL RAM PREVENTER'S. ENSURE ALL WELL CONTROL EQUIP.LINES AND VALVES ARE LINED UP ACCORDINGLY. PU TEST JOINT MU WEAR RING PULLER, PULL WEAR RING. FLUSH AND RINSE STACK FOR TEST-PLUG INSTALL AND BOPE TEST. INSTALL TEST-PLUG. RU ALL BOP TEST EQUIPMENT. FILL BOPE,CHOKE MANIFOLD AND LINES WITH H2O. 22:00 - 00:00 2.00 BOPSUR P INTI PERFORM WEEKLY PRESSURE TESTING OF BOPE TO 250-PSI LOW/3,500-PSI HIGH,FIVE CHARTED MINUTES EACH TEST. ALL IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BPADWOP STANDARDS. -STATE'S AOGCC REPRESENTATIVE,LOU GRIMALDI WAIVED WITNESS,VIA EMAIL JANUARY 05,2013-14:18 FIRS. -TEST WITNESSED:WSL RICK DOLFI AND JR RIG MANAGER DANIEL BLYDENBURGH. -ALL TESTS PASSING. -ANNULAR PREVENTER AND VBR'S TESTED WITH 4"TEST JOINT - ALL CLOSURE TIMES FOR BOP COMPONENTS RECORDED. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 36 of 61 Operation Summary Report Y- U Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:277/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (ft) 1/8/2013 00:00 - 03:30 3.50 BOPSUR P INTI CONTINUE TO PERFORM WEEKLY PRESSURE TESTING OF BOPE 250-PSI LOW/ 3,500-PSI HIGH,FIVE CHARTED MINUTES EACH TEST. ALL IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BPADWOP STANDARDS. ALL TESTS PASSING. TEST WITNESSED: WSL RICK DOLFI AND JR RIG MANAGER DANIEL BLYDENBURGH -ALL BOPE TEST CHARTS AND REPORT ARE ATTACHED. ALL TESTS PASSING. -ANNULAR PREVENTER AND VBR'S TESTED WITH 4"TEST JOINT -(2)HT38 FOSV'S,(1)4-1/2"IF FOSV,&(1) HT38 DART VALVE TESTED. - ALL CLOSURE TIMES FOR BOP COMPONENTS RECORDED. -ALL COMPONENTS FUNCTIONED FROM LER CAB PANEL,RIG MANAGERS OFFICE REMOTE PANEL AND AT ACCUMULATOR. 03:30 - 05:00 1.50 BOPSUR P INTI PULL TEST-PLUG AND PUMP OUT BOP STACK. INSTALL WEAR RING(ID=8.875"). RD TEST JOINT,FOSV AND DART VALVE,LD TEST JOINT TO PIPESHED. BLOW DOWN CHOKE MANIFOLD,KILL LINE,CHOKE LINE AND TOP-DRIVE. 105:00 - 06:00 1.00 CEMT P INTIPU STAND#3 FROM PIPE-SHED.PUMP ACROSS TOP OF WELL. NO LOSS,NO GAIN. MW IN 10.4 PPG, MW OUT 10.4 PPG. 06:00 - 08:00 2.00 CEMT P INTI SERVICE TOP-DRIVE,TRAVELING EQUIPMENT,CROWN. CLEAN AND CLEAR FLOOR.VERIFY DRILL-PIPE TALLY IS CORRECT. HOLD SPILL DRILL WITH AAR. • 08:00 - 09:00 1.00 CEMT N CEMT 9,692.0 INTI MU ROTATING DOG SUB AND PACKER SETTING BHA. -DISCUSS NON-SHEARABLE COMPONENTS PRIOR TO HANDLING BHA. 09:00 - 20:00 11.00 CEMT N CEMT 9,692.0 INTI RIH FROM BHATO6,600-FT,FILL PIPE EVERY 20 STANDS. DISPLACEMENT CORRECT. 6,600-FT, PUW 132K,SOW 119K. MW IN 10.5 PPG, MW OUT 10.5 PPG -PERFORM ANNOUNCED BOP DRILL(D1) KICK WHILE TRIPPING. 20:00 - 21:00 1.00 CEMT N CEMT 9,692.0 INTI CONTINUE TO RIH TO 7,128-FT, PUW 135K, SOW 119K 21:00 - 21:30 0.50 CEMT P INTI SERVICE IRON ROUGHNECK,DRAWVVORKS, INSPECT BX ELEVATORS AND PS-21 SLIPS. • 21:30 - 22:00 0.50 CEMT P INTI CONDUCT SPILL DRILL DURING OFF LOADING OF SEAWATER TO BRINE TANKS, AAR WAS HELD WITH RIG MANAGER AND WSL.EMPHASISE IMPORTANCE OF SPCC AND CORRECT SPILL RESPONSE EQUIPMENT. 22:00 - 22:30 0.50 CEMT N CEMT 9,692.0 INTI CONTINUE TO RIH TO FROM 7,128'TO 8,000-FT, PUW 150K, SOW 125K Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 37 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Daterlime:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To l Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 CEMT N CEMT 9,692.0 INTI 8,000-FT. STAGE UP PUMPS,OBTAINED SPR'S. ESTABLISHED PARAMETERS TO WASH DOWN TO LINER TOP AT 8,341-FT. PUW 160K,SOW 130K,RTW 134K, 60 RPM, 5K TORQUE, 600 GPM, 3,150 PSI. . PUMP AT 2 BPM, 270 PSI AND WASH DOWN INTO LINER TOP, NO ISSUE. TAG ON DEPTH WITH MILL 8,351-FT. TOL=8,341-FT. WEIGHT SET ZXP PACKER WITH 60K DOWN WEIGHT GOOD INDICATION AT SURFACE OF PACKER SETTING. 1/9/2013 00:00 - 00:30 0.50 CEMT N CEMT 9,692.0 INTI CONTINUE WITH WEIGHT SET OF ZXP PACKER. PU 10-FTABOVE TIE BACK, SLACK OFF 3x WITH 60K DOWN WEIGHT TO ENSURE PACKER IS SET. PU 10-FT ABOVE TIE BACK, ROTATE 25-RPM,5KTRQ. SLACK OFF WHILE RT. RTW=141K, PUW=160K, SO=130K 00:30 - 02:00 1.50 CEMT N CEMT 9,692.0 INTI ROTATE AND RECIPROCATE 60 RPM WHILE CIRCULATE BOTTOMS UP, 500-BBLS PUMPED TOTAL. 620 GPM, 140 SPM, 3050 PSI. MW IN 10.4 PPG, MW OUT 10.4 PPG. 02:00 04:00 2.00 CEMT N CEMT 9,692.0` INTI PJSM, PRESSURE TEST 9-5/8"x 7"LINER TO 250-PSI LOW FOR 5-CHARTED MINUTES, 3,500-PSI HIGH FOR 30-MIN CHARTED. EACH TEST PASSING. PUMP 7.6-BBL TO PRESSURE, 7.5-BBL BLED BACK. BLED PRESSURE,CONFIRM BOTH SICP AND SIDP ARE ZERO. OPEN UPPER PIPE RAMS AND VERIFY OPEN. GRANTED WTL APPROVAL TO PROCEED. REFER TO ATTACHED DOCUMENTS. MONITOR WELL 10-MIN(STATIC) 04:00 - 05:00 1.00 CEMT N CEMT 9,692.0 INTI PJSM FOR UPCOMING DISPLACEMENT FROM 10.4-PPG LSND TO SEAWATER. OFFLOAD LSND FROM ACTIVE PIT 1 TO VAC TRUCK IN PREPARATION FOR DISPLACEMENT. - OUT OF CRITICAL PATH,HOLD AAR WITH RIG TEAM DISCUSSING CASING LINER TEST AND PENDING CHANGES TO WSP. 05:00 - 06:30 1.50 CEMT N CEMT 9,692.0 INTI DISPLACEMENT. PUMP 40-BBL SPACER. DISPLACE FROM 10.4 PPG LSND TO 8.5 PPG SEAWATER. ROTATE AND RECIPROCATE WHILE DISPLACING, 80 RPM, 5KTRQ, 420 GPM, ICP 1750 PSI. FCP WITH 8.5 PPG SEAWATER=1280 PSI. PUMP 686 BBL TOTAL. VERIFY BBL PUMPED IS EQUAL TO A BBL OUT. VOLUMES CORRECT THROUGHOUT DISPLACEMENT. SEAWATER IN 8.5-PPG, SEAWATER OUT 8.5 PPG 06:30 - 07:30 1.00 CEMT P INTI MONITOR WELL 10-MIN AFTER DISPLACING (WELL STATIC). LD SINGLE JOINT IN PREPERATION FOR NEGATIVE PRESSURE TEST. LINE UP TO CHOKE MANIFOLD,CLOSE ANNULAR PREVENTER AND FILL MUG GAS SEPERATOR.(128 STKS=12.8 BBL TO FILL). LINE UP FOR CHARTING POTENTIAL PRESSURE WITH ANY POSSIBLE RETURNS TO TRIP TANK. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 38 of 61 Operation Summary Report Common Wet Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date • From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:30 1.00 CEMT P INTI PERFORM NEGATIVE PRESSURE TEST OF 9-5/8"x 7"LINER TOP PACKER AFTER DISPLACEMENT TO 8.5 PPG SEAWATER. CONTINUE TO MONITOR SIDP AND SICP (BOTH ZERO). OPEN CHOKE MANIFOLD VALVES TO MUD GAS SEPARATOR,STAND PIPE BLEEDER VALVE. MONITOR FOR 10-MIN OBSERVING FOR ANY GAIN. (ZERO GAIN) **WELLBORE BARRIERS:WELLHEAD ANNULAR VALVES,TESTED BOPE,TESTED 9,5/8"x 7"CASING LINER TOP PACKER, TESTED CEMENT IN 7"CASING. 08:30 - 09:30 1.00 CEMT P INTI OPEN ANNULAR PREVENTER,DRAIN MUD GAS SEPARATOR,'BLOW DOWN TOP-DRIVE, CHOKE LINE,AND CHOKE,MANIFOLD. FLUSH LSND FROM TRIP TANK 1 AND 2. CLEAN AND CLEAR RIG FLOOR FOR POOH. 09:30 - 12:00 2.50 CEMT N CEMT 9,692.0 INTI POOH FROM 8,352'TO 4,746-FT. PUW 113K, SOW 105K , SEAWATER IN 8.5-PPG, SEAWATER OUT . . 8.5-PPG 12:00 - 16:00 4.00 CEMT N CEMT 9,692.0` INTI CONTINUE TO POOH FROM 4,746'TO 667-FT. NO ISSUES ON TRIP,HOLE FILL VOLUMES CORRECT. 16:00 - 18:00 2.00 CEMT N CEMT 9,692.0 INT1; PJSM FOR BHA HANDLING. MONITOR WELL 10-MIN(STATIC). CHANGE OUT PS-21 SLIPS AND INSTALL MASTER BUSHINGS. POOH FROM 667'TO BHA. LD PACKER SETTING BHA,(DOG SUB SHEARED)AND MILLS. CLEAN AND CLEAR FLOOR OF BHA. 18:00 - 20:00 2.00 CEMT N CEMT 9,692.0 INTI MAKE UP CLEAN OUT BHA. HUGHES MILL TOOTH BIT,NEAR BIT STABILIZER,AND 4-IN HWDP. RIH TO 683-FT. PULL MASTER BUSHINGS AND INSTALL PS-21 SLIPS FOR TRIP IN HOLE. 20:00 - 00:00 4.00 CEMT N CEMT 9,692.0 INTI CONTINUE TO RIH FROM 683'TO 4,478-FT WITH BHA#10 ON 4-IN DP FROM DERRICK. MONITOR WELL ON TRIP TANK. FILL DRILL-PIPE EVERY 20 STANDS. DISPLACEMENT VOLUMES CORRECT. SEAWATER IN 8.5-PPG, SEAWATER OUT 8.5-PPG. PUW 108K, SOW 104K 1/10/2013 00:00 - 05:30 5.50 CEMT N CEMT 9,692.0 INTI CONTINUE TO RIH FROM 4,478'TO 8,341'MD. -PUW=165, SOW=134,RTW=147 KLBS -445 GPM @ 1,575 PSI -20 RPM @ 4 KFT/LBS SEAWATER IN 8.5-PPG. SEAWATER OUT 8.5-PPG KICK WHILE TRIPPING DRILL AND AAR WITH RIG CREWS. SLOW PUMP RATES AT 8341'MD,8.5 PPG: MP#1: 20 SPM=70 PSI,30 SPM=150 PSI,40 SPM=260 PSI MP#2: 20 SPM=70 PSI,30 SPM=150 PSI,40 SPM=260 PSI Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 39 of 61 Operation Summary Report Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:OOAM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:30 - 14:30 9.00 CEMT N CEMT 9,692.0 INTI WASH DOWN FROM 8341'MD TO TAG TOP OF CEMENT IN 7"LINER AT 8398'MD(57'BELOW TOL AT 8341'MD). CLEANOUT CEMENT FROM 8398'MD TO 9505'MD WITH NO ISSUES, AVERAGING 110 FPH WITH CONNECTIONS. -550 GPM,1600-2000 PSI,100 BIT RPM,6-9 KFT-LBS TORQUE,10-20 KLBS WOB 14:30 - 15:00 0.50 CEMT P INTI UNANNOUNCED KICK WHILE DRILLING(D2) DRILL-FLUID INJECTED INTO BELL NIPPLE FROM INACTIVE PIT TO SIMULATE PIT GAIN AND FLOW INCREASE. SIMULATED KICK CAUGHT WITHIN 2 BBLS. SECURE WELL AND HOLD AFTER ACTION REVIEW WITH RIG CREW. 15:00 - 15:30 0.50 CEMT N CEMT 9,692.0 INTI CLEANOUT CEMENT FROM 9505'MD TO 9565' MD,127'ABOVE LINER BOTTOM AT 9692'MD, WITH NO ISSUES,AVERAGING 110 FPH WITH ' CONNECTIONS. -550 GPM,1600-2000 PSI,100 BIT RPM,6-9 KFT-LBS TORQUE,10-20 KLBS WOB SLOW PUMP RATES AT 9565'MD,8.5 PPG: MP#1: 20 SPM=86 PSI,30 SPM=153 PSI,40 SPM=250 PSI MP#2: 20 SPM=105 PSI,30 SPM=183 PSI,40 SPM=280 PSI 15:30 - 16:30 1.00 CEMT N CEMT 9,692.0 INTI CIRCULATE WELL CLEAN -100 RPM,9 KFT-LBS TORQUE,1700-1900 PSI 16:30 - 17:30 1.00 CEMT N CEMT 9,692.0 INTI FLOWCHECK WELL PRIOR TO PULLING OFF BOTTOM(STATIC). PUMP DRY JOB. 17:30 - 18:30 1.00 CEMT N CEMT 9,692.0 INTI PULL OUT HOLE HOLE WITH CLEANOUT ASSEMBLY ON ELEVATORS,RACKING BACK DRILLPIPE,FROM 9565'MD TO 8273'MD(68' ABOVE TOP OF 7"LINER). 18:30 - 20:00 1.50 CEMT N CEMT 9,692.0 INTI CIRCULATE SURFACE TO SURFACE TO CIRCULATE DRY JOB OUT OF HOLE. MW IN= MW OUT=8.7 PPG. -420 GPM,1025 PSI 20:00 - 20:30 0.50 CEMT P INTI RIG UP TO PRESSURE TEST7"LINER. CLOSE UPPER PIPE RAMS. 20:30 - 22 30 2.00 CEMT P INTI PRESSURE TEST 7"LINER TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN (PASSING TESTS),SEE ATTACHED DOCUMENTATION. OBTAIN APPROVAL TO PROCEED WITH OPERATIONS(STARTING OPS CHANGE NOTICE#6)FROM WELLS TEAM LEADER. OPEN UPPER PIPE RAMS. NEW WELL BARRIERS: TESTED 7"LINER, KILL WEIGHT FLUID,WELLHEAD ANNULAR VALVES,BOPE 22:30 - 00:00 1.50 CEMT P INTI SLIP AND CUT 77',9 WRAPS OF 1-3/8"DRILL LINE. CIRCULATE ACROSS THE TOP WITH TRIP TANK TO MONITOR THE WELL(NO GAIN/LOSS). Printed 2/25/2013 10 56 42AM a North America-ALASKA-BP Page 40 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/11/2013 00:00 - 06:30 6.50 CEMT P INTI COMPLETE SLIPPING AND CUTTING DRILL LINE. HAVE DIFFICULTY ACHIEVING TIGHT WRAPS ON DRAVWVORKS DRUM. RE-SPOOL DRUM SEVERAL TIMES. HOLD 1 HOUR ACTION ACTION REVIEW AT END OF JOB TO DISCUSS LEARNINGSAND UPDATES TO PROCEDURE. FINALIZE PROCEDURE FOR SPOOLING DRILL LINE OUT OF PIPE SHED TO MAINTAIN ENOUGH TENSION FOR TIGHT WRAPS. CALIBRATE DRAWWORKS SETTINGS. 06:30 - 09:00 2.50 CEMT N CEMT 9,692.0 INTI RUN IN HOLE WITH CLEANOUT ASSEMBLY FROM TOP OF LINER AT 8273'MD TO 9507' MD. WASH DOWN FINAL STAND FROM 9507' MD TO TAG CEMENT AT 9565'MD AS PLANNED. P/U Wr=195 KLBS,S/O WT=136 KLBS,ROT WT=161 KLBS. SLOW PUMP RATES AT 9565'MD,8.6 PPG SEAWATER: MP#1: 20 SPM=84 PSI,30 SPM=160 PSI,40 SPM=260 PSI MP#2: 20 SPM=84 PSI,30 SPM=160 PSI,40 SPM=260 PSI 09:00 - 10:30 1.50 CEMT N CEMT 9,692.0 INTI CLEANOUT CEMENT IN 7"LINER FROM 9565' MD TO LANDING COLLAR AT 9610'MD ON DEPTH. WORK THROUGH LANDING COLLAR FOR 1/2 HOUR WITH VARYING FLOWRATES; 425/550 GPM,1250/1900 PSI ON BOTTOM. CLEANOUT REMAINDER OF CEMENT FROM 9610'MD TO LINER SET DEPTH AT 9692'MD+ 1'NEW FORMATION TO 9693'MD. FLOAT COLLAR ON DEPTH AT 9649'MD.. -100 RPM,9.5-10.5 KFT-LBS TORQUE,550 GPM,2050-2150 PSI,10 KLBS WOB. NOTE: NO SIGN OF U-TUBING AFTER DRILLING OUT SHOE 10:30 - 13:30 3.00 CEMT N CEMT 9,692.0 INTI CIRCULATE HOLE CLEAN WITH HI-VIS SWEEP WHILE RECIPROCATING PIPE OVER 30' INTERVAL. FLOVVCHECK WELL PRIOR TO PULLING OFF BOTTOM(STATIC). -55 GPM,2080 PSI,100 RPM,8 KFT-LBS TORQUE,ROT WT=156 KLBS. SLOW PUMP RATES AT 9693'MD,8.6 PPG SEAWATER: MP#1: 20 SPM=86 PSI,30 SPM=168 PSI,40 SPM=270 PSI MP#2: 20 SPM=87 PSI,30 SPM=162 PSI,40 SPM=270 PSI 13:30 - 15:30 2.00 CEMT N CEMT 9,692.0 INTI PULL OUT OF HOLE FROM 9693'MD TO TOP OF LINER AT 8341'MD ON ELEVATORS, RACKING BACK DRILLPIPE. PU WEIGHT OFF BOTTOM=201 KLBS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 41 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date.1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:11/25/1977 12:00:00AM Rig Release 2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 17:30 2.00 CEMT N CEMT 9,692.0 INTI CIRCULATE HOLE CLEAN AT TOP OF LINER WITH HI-VIS SWEEP WHILE RECIPROCATING PIPE. FLOW CHECK WELL PRIOR TO PULLING OUT OF HOLE(STATIC). TAG UP AT 8354'MD(BASE OF BAKER ZXPN LINER TOP PACKER TBR)ON FIRST ATTEMPT TO RE-ENTER LINER TOP. PICKUP CLEAN AND RE-ATTEMPT SUCCESSFULLY TWICE MORE TO CONFIRM CLEAN ENTRY INTO LINER. -100 RPM,8 KFT-LBS TORQUE,550 GPM, 2050-2100 PSI. 17:30 - 22:00 4.50 CEMT N CEMT 9,692.0 INTI TRIP OUT OF HOLE WITH 6-1/8"CLEANOUT ASSEMBLY,RACKING BACK 4"DRILLPIPE, FROM TOP`OF LINER AT 8341'MD TO 2200'MD (AVERAGE 15'STANDS PER HOUR). TRIP SHEET SHOWS ACCURATE HOLE FILL FOR TRIP. PICKUP WEIGHTAT TOP OF LINER= 175 KLBS,SLACKOFF=128 KLBS. 22:00 - 22:30 0.50 CEMT P INTI HOLD UNANNOUNCED KICK WHILE TRIPPING DRILL. MANIPULATE FLOW PADDLE TO SHOW FLOW INCREASE. DISCUSS COMPLEX SCENARIO OF FAILED FOSV DURING AFTER ACTION REVIEW WITH RIG CREWS. 22:30 - 00:00 1.50 CEMT N CEMT 9,692.0 INTI TRIP OUT OF THE HOLE WITH 6-1/8" CLEANOUTASSEMBLY,RACKING BACK DRILLPIPE,FROM 2240'MD TO BHAAT 683' MD AT MIDNIGHT(TRIP COMPLETED ON 1/12/2013). FLOWCHECK WELLAT BHA (STATIC). 1/12/2013 00:00 - 03:30 3.50 CEMT N CEMT 9,692.0 INTI PULL OUT OF HOLE FROM BHAAT 683'MD TO SURFACE,LAYING DOWN 4"HWDP. GRADE 6-1/8"TRI-CONE CLEANOUT BIT 1-1,IN GAUGE. 03:30 - 04:00 0.50 CEMT N CEMT 9,692.0 INTI CLEAR RIG FLOOR AFTER TRIPPING. MONITOR WELL WITH HOLE FILL OFF (STATIC). CLOSE BLIND RAMS AND RESUME MONITORING WELL CIRCULATING OVER TOP THROUGH KILUCHOKE LINES. 04:00 - 06:00 2.00 EVAL P INTI MIRU SCHLUMBERGER E-LINE UNIT AND GYRODATA. LOAD TOOLS TO RIG FLOOR AND RIG UP FOR WIRELINE WORK, INCLUDING LINE WIPER FOR E-LINE. OPEN — BLIND RAMS AND MAINTAIN CIRCULATION OVER TOP OF HOLE TO MONITOR WELL. 06:00 - 14:30 8.50 EVAL P INTI RUN IN HOLE WITH GYRODATA MULTI-SHOT SURVEY TOOL ON E-LINE FROM SURFACE TO WELL TOTAL DEPTH AT 9693'MD. LOG OUT OF HOLE FROM 9693'MD TO SURFACE. BARRIERS DURING WIRELINE OPS: STATIC FLUID COLUMN,BOPE,ANNULAR VALVES 14:30 - 15:00 0.50 EVAL P INTI RIG DOWN GYRO TOOLS AND RE-HEAD E-LINE. 15:00 - 16:30 1.50 EVAL N CEMT 9,692.0 INTI MAKE UP SCHLUMBERGER USIT CEMENT EVALUATION TOOLS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 42 of 61 Operation Summary Report Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 22:30 6.00 EVAL N CEMT 9,692.0 INTI RUN IN HOLE WITH SCHLUMBERGER CCUGR/USIT/MSIP/GPIT LOGGING TOOLS ON E-LINE FROM SURFACE TO 9675'MD(WELL TOTAL DEPTH AT 9693'MD). COMPLETE REPEAT PASS UP TO 9050'MD AND RUN BACK IN HOLE TO 9680'MD. LOG UP TO TOP OF 7"LINER AT 8360'MD WITH USIT TOOLS. LOG REMAINDER OF HOLE FROM 7"TOP OF LINER TO SURFACE WITH ONLY GR TOOL. INTERPRETATION OF LOG COMPLETED BY BP WELLS INTERVENTION ENGINEER TODD SIDOTI. CIRCUMFERENTIAL ISOLATION DETERMINED TO BE AS FOLLOWS: -TOP OF SAG RIVER DPZ=9688'MD,8445' ND -9416'MD-9488'MD(72')SOLID INTERVAL -9520'MD-9662'MD(142')SOLID INTERVAL -TOTAL 214'MD,,184'VERTICAL,WHICH IS GREATER THAN 100'VERTICAL REQUIRED BY GP10-60 FOR DPZ ISOLATION. -FIELD PICK TOC=9390'MD,8200'ND -CONFIRM AUTHORIZATION TO PROCEED WITH DRILLING ENGINEER 22:30 - 00:00 1.50 EVAL P INTI RDMO SCHLUMBERGER E-LINE UNIT. CLEAR RIG FLOOR FOR MAKING UP BHA. 1/13/2013 00:00 - 01:30 1.50 EVAL P INTI RDMO SCHLUMBERGER E-LINE UNIT. CLEAR RIG FLOOR FOR MAKING UP BHA. SETUP FOSV WITH XOS FOR MAKING UP DRILLING BHA. 01:30 - 07:00 5.50 DRILL P INTI HOLE PJSM WITH RIG CREWAND SCHLUMBERGER. MAKEUP AND SCRIBE IN HOLE WITH 6-1/8"DIRECTIONAL DRILLING ASSEMBLY TO BHA OVERALL LENGTH AT 252' MD. TOTAL BHA BUOYANT WEIGHT IN 8.6 PPG SEAWATER=8 KLBS. -6-1/8"HYCALOG SKI513M-BIB PDC BIT, SER#A165359 -4-3/4"1.5°BENT POWERPAK POSITIVE DISPLACEMENT MUD MOTOR WITH PORTED FLOAT -4-3/4"MWD TOOLS INCLUDING DIR/GR/RES/DEN/NEU -WELL COMMANDER MULTI-CYCLE CIRC SUB AND HYDRAULIC DRILLING JARS 07:00 - 08:00 1.00 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DIRECTIONAL ASSEMBLY FROM BHAAT 252'MD TO 1000' MD. 08:00 - 08:30 0.50 DRILL P INTI BREAK CIRCULATION. SHALLOW TEST MWD TOOLS PER SCHLUMBERGER PROCEDURE (PASS). -1000'MD,225 GPM,831 PSI(MODELED PRESSURE=1106 PSI). 08:30 - 10:00 1.50 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DIRECTIONAL ASSEMBLY FROM 1000'MD TO 1570'MD. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 43 of 61 Operation Summary Report Common Wet Name:02-12 AFE No • Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 00:00 14.00 DRILL N WAIT 9,693.0 INTI WAIT ON WEATHER(PHASE 3 CONDITIONS) -STAB FOSV ON TOP OF STAND#14 AND SET SLIPS WITH BIT DEPTH AT 1570'MD -MONITOR WELL USING BY CONTINUOUSLY CIRCULATING OVER THE TOP(STATIC) -TABLE TOP DRILLS -TRAINING FOR UPCOMING OPERATIONS (SHUBLIK PHENOMENON) 1/14/2013 00:00 - 00:00 24.00 DRILL N WAIT 9,693.0 INTIWAIT ON WEATHER(PHASE 3 CONDITIONS) -STAB FOSV ON TOP OF STAND#14 AND SET SLIPS WITH BIT DEPTH AT 1570'MD -MONITOR WELL BY CONTINUOUSLY CIRCULATING OVER TOP(STATIC). -TABLE TOP DRILLS -UPDATE AND REVISE PARKER WORK SAFE PROCEDURES' -TRAINING FOR UPCOMING OPERATIONS (SHUBLIK PHENOMENON) -COMPLETE CREW CHANGEOUTS AND MOVEMENTS BETWEEN CAMP AND RIG THROUGH COORDINATION WITH PBOC INCIDENT MANAGEMENT TEAM. 1/15/2013 12:00 - 13:00 1.00 DRILL N WAIT 9,693.0 INTI RECEIVE ORDERS TO RETURN TO WORK .UPON FIELD PHASE/LEVEL CONDITION REDUCTION. UNSTAB FOSV. INSPECT DERRICK AND DRAVWVORKS. 00:00 - 12:00 12.00 DRILL N WAIT 9,693.0 INTI WAIT ON WEATHER(PHASE 3 CONDITIONS) -STAB FOSV ON TOP OF STAND#14 AND SET SLIPS WITH BIT DEPTH AT 1570'MD -MONITOR WELL BY CONTINUOUSLY CIRCULATING OVER TOP(STATIC). -TABLE TOP DRILLS -UPDATE AND REVISE PARKER WORK SAFE PROCEDURES -TRAINING FOR UPCOMING OPERATIONS (SHUBLIK PHENOMENON) -COMPLETE CREW CHANGEOUTS AND MOVEMENTS BETWEEN CAMP AND RIG THROUGH COORDINATION WITH PBOC INCIDENT MANAGEMENT TEAM. 13:00 - 19:30 6.50 DRILL P INTI TRIP IN HOLE WITH 6-1/8"DIRECTIONAL ASSEMBLY(BHA#11)FROM 1570'MD TO 8184' MD(177'ABOVE TOP OF 7"LINER),FILLING PIPE EVERY 20 STANDS. PICKUP WEIGHT= 170 KLBS,SLACKOFF=125 KLBS. SLOW PUMP RATE,8.6 PPG SEAWATER,8184' MD: MP#2: 20 SPM=215 PSI,30 SPM=355 PSI,40 SPM=455 PSI 19:30 - 22:30 3.00 DRILL P INTI MU 9-5/8"HES RTTS STORM PACKERL WITH X/O'S ONTO STRING. RUN IN HOLE AND HANGOFF STRING AT 98'MD,BIT AT 8305'MD. LAYDOWN RUNNING TOOL. CLOSE BLIND RAMS. PRESSURE TEST PACKER FROM ABOVE TO 250 PSI LOWAND 1000 PSI HIGH FOR FIVE MIN EACH(PASS). OPEN BLIND RAMS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 44 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Tme:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 23:30 1.00 DRILL P INTI RIG UP TO TEST BOPE. PULL WEAR BUSHING,DRAIN STACK,INSTALL TEST PLUG,FILL LINES AND RUN IN HOLE WITH 4" TEST JOINT. 23:30 - 00:00 0.50 BOPSUR P INTI PRESSURE-FUNCTION TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE, JEFF JONES. -TEST COMPLETED ON 1/16/2013. DETAILS OF TEST ON FOLLOWING REPORT. 1/16/2013 00:00 - 09:00 9.00 BOPSUR P INTI PRESSURE-FUNCTION TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BPADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED-BY AOGCC REPRESENTATIVE, JEFF JONES. -ALL BOPE TEST CHARTS AND REPORTARE ATTACHED. -ANNULAR PREVENTER TESTED WITH 4" TEST JOINT. VBRS TESTED WITH 4"AND 4-1/2"TEST JOINTS. -(2)HT38 FOSVS,(1)HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. -HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. -ALL COMPONENTS FUNCTIONED FROM CONTROLS IN LER,RIG MANAGER'S OFFICE AND ATACCUMULATOR UNIT. -(14)BACKUP N2 BOTTLES ALL CHECKED, AVERAGE PRESSURE=2025 PSI. -ONE FAIUPASS RESULT(TARGET BOX FLANGE ON CHOKE LINE). RE-TIGHTEN FLANGE AND RE-TEST. 09:00 - 10:30 1.50 BOPSUR P INTI RIG DOWN AFTER TESTING BOPE. 10:30 - 14:30 4.00 BOPSUR N RREP 9,693.0 INTI NON-PRODUCTIVE TIME: UNABLE TO BLOWDOWN KILL LINE DUE TO RESTRICITION. BREAK APART LINE TO CLEAR. RE-TEST KILL LINE AFTER REBUILDING TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH(PASS,SEE ATTACHED CHART) 14:30 - 15:30 1.00 BOPSUR P INTI BLOWDOWN KILL LINE,PULL TEST PLUG AND RIG DOWN AFTER BOP TESTING. INSTALL WEAR BUSHING(ID=8-7/8"). 15:30 - 18:00 2.50 DRILL P INTI MAKEUP AND RUN IN HOLE WITH RTTS PULLING TOOL. ENGAGE RTTS. CLOSE ANNULAR PREVENTER. RELEASE RTTS AND OBSERVE WELL AGAINST CLOSED CHOKE. CONFIRM NO PRESSURE BELOW PACKER. OPEN ANNULAR PREVENTER. PULL OUT OF HOLE AND LAYDOWN 9-5/8"HES RTTS STORM PACKER. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 45 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/lime:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 20:30 2.50 DRILL P INTI TRIP IN HOLE FROM TOP OF 7"LINER TO PREVIOUSLY DRILLED TO DEPTH AT 9693' MD. NO ISSUES ENTERING TOP OF 7"LINER. CALIBRATE DEPTH WITH SLB MWD. SLOW PUMP RATES AT 7"LINER SHOE,9692' MD,8.5 PPG MUD: MP#1: 20 SPM=225 PSI,30 SPM=379 PSI,40 SPM=610 PSI MP#2: 20 SPM=234 PSI,30 SPM=405 PSI,40 SPM=617 PSI 20:30 - 21:30 1.00 DRILL P INTI DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE SECTION FROM 9693'MD TO 9712'MD (20'OUTSIDE OF 7"LINER SHOE). 200 GPM,1000 PSI ON BOTTOM/890 PSI OFF BOTTOM,5 KLBS WOB -40 RPM,11 KFT-LBS TORQUE ON BOTTOM, 10 KFT-LBS OFF. ACTUAL DRILLING HOURS=0.28 ACTUAL ROTATING HOURS=0.28,SLIDING= 0 HRS. 21:30 - 00:00 2.50 DRILL P INTI DISPLACE WELL FROM 8.6 PPG SEAWATER TO 8.5 PPG POWERPRO SOLIDS-FREE MUD. 200 GPM,INITIAL CIRC PRESSURE -RECIPROCATE DRILLSTRING 10'STROKES OFF BOTTOM,80 RPM,INITIAL TORQUE=10.5 KLBS. +► NOTE: SHUTDOWN DISPLACEMENT AT 3100 STROKES(6200 STROKES SURFACE TO SURFACE REQUIRED)DUE TO DISCREPANCIES IN PIT VOLUMES VS VOLUME PUMPED. FLOWCHECK WELL (STATIC)ANDTHEN RESUME DISPLACEMENT. 1/17/2013 00:00 - 00:30 0.50 DRILL P INTI COMPLETE DISPLACEMENT FROM 8.6 PPG SEAWATER TO 8.5 PPG POWERPRO SOLIDS FREE MUD. MW IN/OUT=8.5 PPG. FINAL CIRCULATION PRESSURE AT 200 GPM=850 PSI. ROTATING TORQUE AT 80 RPM=5 KFT-LBS. 00:30 - 02:30 2.00 DRILL P INTI STOP ROTATING,PULL UP INTO 7"LINER SHOE AT 9692'MD AND MONITOR WELL (STATIC). CLEAN PITS AFTER DISPLACEMENT AND LOAD ENTIRE SYSTEM WITH NEW 8.5 PPG POWERPRO MUD IN PREPARATION FOR DRILLING AHEAD. d �M Printed 2/25/2013 10:56.42AM North America-ALASKA-BP Page 46 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:30 - 03:30 1.0.00 DRILL P INTI CLOSE UPPER PIPE RAMS. LINE UP TO PUMP DOWN DRILLSTRING AND BACKSIDE. ` , PERFORM FORMATION INTEGRITY TEST TO Y 9.4 PPG EMW(8450'TVD.8.5 PPG MW 395 PSI APPLIED SURFACE PRESSURE). DISCUSS RESULTS WITH ODE AND RECEIVE AUTHORIZATION TO PROCEED WITH OPERATIONS. SEE ATTACHED DOCUMENTATION. SLOW PUMP RATES AT 7"LINER SHOE,9692' MD,NEW 8.5 PPG MUD: MP#1: 20 SPM=325 PSI,30 SPM=450 PSI,40 SPM=620 PSI MP#2: 20 SPM=323 PS(30 SPM=447 PSI,40 SPM=620 PSI 03:30 - 04:00 0.50 DRILL P PROD1 WASH DOWN FROM 7"LINER SHOE AT 9692' MD TO PREVIOUSLY DRILLED DEPTH OF 9712'MD. -.246 GPM,11-20 PSI 04:00 - 09:00 5.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9712'MD TO 9796'MD(84'IN 5 FIRS=17 FPH). NO LOSSES TO FORMATION WHILE DRILLING. -TAKE SURVEYS EVERY 30'DRILLED,SLIDE -15'30R-40R ON EVERY SINGLE. -SHUBLIK TOP PROGNOSED AT 9727'MD(NO LOGS TO CONFIRM TOP YET) -246 GPM,1250-1400 PSI ON BOTTOM,1140 PSI OFF BOTTOM,5-12 KLBS WOB SLIDING& ROTATING -40 TOP DRIVE RPM,121 TOTAL BIT RPM,4-5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE. • -MW IN/OUT=8.5 PPG,VIS IN/OUT=44 SEC/QT -ACTUAL DRILLING TIME FOR INTERVAL= 3.17 HRS,ART=1.02 HRS,AST=2.15 HRS CONFIRMED SAG RIVER FORMATION TOP AT 9691'MD,8429'ND(4'HIGH) UNABLE TO COMMUNICATE WITH MWD TOOLS AT 9796'MD. PICK UP OFF BOTTOM. 09:00 - 10:00 1.00 DRILL P PROD1 TROUBLESHOOT MWD TOOLS. UNSUCCESSFULLY PERFORM SLB ANTI-JAMMING PROCEDURE. DECISION TO PULL OUT OF HOLE TO CHANGEOUT MWD TOOLS. FLOWCHECK WELL(STATIC). 10:00 - 10:30 0.50 DRILL N DFAL 9,796.0 PROD1 RACK ONE STAND BACK TO PULL UP INTO 7" LINER SHOE AT 9692'MD. PICKUP WEIGHT .r+ OFF BOTTOM=172 KLBS,SLACKOFF=149 KLBS. 10:30 - 13:00 2.50 DRILL N DFAL 9,796.0 PROD1 CIRCULATE HOLE CLEAN WITH 35 BBL HI-VIS SWEEP SURFACE TO SURFACE;246 GPM, 990 PSI,RECIRPOCATING PIPE 30'. SHUT DOWN PUMPS AND FLOWCHECK WELL (STATIC). 13:00 - 14:00 1.00 DRILL N DFAL 9,796.0 PROD1 PULL OUT OF HOLE WET FROM 7"LINER SHOE AT 9692'MD TO 8790'MD,RACKING BACK 4"DRILLPIPE. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 47 of 6 Operation Summary Report A-, Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:00 - 15:00 1.00 DRILL N DFAL 9,796.0 PROD1 BREAK CIRCULATION AND UNSUCCESSFULLY TROUBLESHOOT MWD TOOLS. PUMP 1 PPG OVER DRY JOB MADE FROM SAFE-CARB 250 AND BLOWDOWN TOP DRIVE. 15:00 - 21:00 6.00 DRILL N DFAL 9,796.0 PROD1 TRIP OUT OF HOLE FROM 8790'MD TO 600' MD,RACKING BACK 4"DRILLPIPE(TOP OF BHA WITH RADIOACTIVE SOURCE-300' BELOW GROUND LEVEL). HOLE TAKING CORRECT AMOUNT OF FILL. AVERAGE=15 STANDS/HR,1400 FPH. FLOWCHECK WELL PRIOR TO PULLING BHA THROUGH BOP STACK(STATIC). HOLD KICK WHILE TRIPPING DRILL AND AAR WITH RIG CREW. 21:00 - 21:30 0.50 DRILL N DFAL 9,796.0 PROD1 HQLD PJSM FOR LAYING DOWN BHAAND WORKING WITH RADIOACTIVE SOURCES. 21:30 - 00:00 2.50 DRILL N DFAL 9,796.0 PROD1 LAYDOWN6-1/8"DIRECTIONAL BHA. CHECK WELL COMMANDER CIRC SUB FOR FULLY CLOSED PORTS(CONFIRMED). REMOVE RADIOACTIVE SOURCES FROM DENSITY/NEUTRON MWD TOOL 1/18/2013 00:00 - 01:00 1.00 DRILL N DFAL 9,796.0 PROD1 LAYDOWN REMAINDER OF 6-1/8" DIRECTIONAL BHA. BREAK BIT FROM MUD MOTOR. GRADE BIT 1-1,IN GAUGE (ACCEPTABLE TO RE-RUN ON NEXT TRIP IN HOLE). NO PLUGGED NOZZLES,(1)1-1/2" ROCK LODGED IN NOSE AREA THOUGH NOT AFFECTING ANY BLADES. 01:00 - 02:00 1.00 DRILL N DFAL 9,796.0 PROD1 DISCOVER 1.5°MUD MOTOR COMPLETELY PACKED OFF WITH SAFECARB MATERIAL USED AT BEGINNING OF TOH FOR DRY JOB. LAYDOWN MOTOR. 02:00 - 02:30 0.50 DRILL P PROD1 SERVICE TOP DRIVE AND IRON DERRICKMAN (WEATHERFORD REP ON LOCATION). 02:30 - 06:30 4.00 DRILL N DFAL 9,796.0 PROD1 MAKEUP AND SCRIBE IN HOLE WITH 6-1/8" DIRECTIONAL DRILLING ASSEMBLY TO BHA OVERALL LENGTH AT 252'MD(BHA#12 FOR WELL). TOTAL BHA BUOYANT WEIGHT IN 8.5 PPG POWERPRO MUD=8 KLBS. -6-1/8"HYCALOG SKH513M-B1B PDC BIT, SER#A165359(RE-RUN) -4-3/4"1.5°BENT POWERPAK POSITIVE DISPLACEMENT MUD MOTOR WITH PORTED FLOAT -4-3/4"MWD TOOLS INCLUDING DIR/GR/RES/DEN/NEU -WELL COMMANDER MULTI-CYCLE CIRC SUB AND HYDRAULIC DRILLING JARS 06:30 - 08:00 1.50 DRILL N DFAL 9,796.0 PROD1 TRIP IN HOLE WITH 6-1/8"DIRECTIONAL DRILLING ASSEMBLY FROM BHAAT 252'MD TO 1011'MD. 08:00 - 08:30 0.50 DRILL N DFAL 9,796.0 PROD1 BREAK CIRCULATION AND PERFORM MWD SHALLOW HOLE TEST(PASS). -250 GPM,850 PSI Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 48 of Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 — Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 18:00 9.50 DRILL N DFAL 9,796.0 PROD1 TRIP IN HOLE WITH 6-1/8"DIRECTIONAL DRILLING ASSEMBLY FROM 1011'MD TO 9739' MD(57'OFF BOTTOM),FILLING 4"DRILLPIPE EVERY 10 STANDS. SLOW PUMP RATES AT 9796'MD,NEW BHA, 8,5 PPG MUD: MP#1: 20 SPM=327 PSI,30 SPM=442 PSI,40 SPM=608 PSI MP#2: 20 SPM=328 PSI,30 SPM=449 PSI,40 SPM=607 PSI 18:00 - 19:00 1.00 DRILL N DFAL 9,796.0 PROD1 LOG DOWN AT 150 FPH FROM 9739'MD TO PREVIOUSLY DRILLED DEPTH OF 9796'MD TO GATHER DATA NOT CAPTURED IN PREVIOUS MWD FAILURE RUN. -220 GPM,1040 PSI,40 RPM,4.5 KFT-LOBS • TORQUE 19:00 - 00:00 5.00 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9796'MD TO 9925'MD AT MIDNIGHT(129'IN 5 HRS=26 FPH). NO LOSSES TO FORMATION WHILE DRILLING. TAKE SURVEYS EVERY 30'DRILLED,SLIDE -15'-25R-30R ON EVERY SINGLE. 250 GPM,1400-1500 PSI ON BOTTOM,1285 PSI OFF BOTTOM,5-12 KLBS WOB SLIDING& ROTATING -40 TOP DRIVE RPM,123 TOTAL BIT RPM,4-5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.5 PPG,VIS IN/OUT=40 SEC/QT -ACTUAL DRILLING TIME FOR INTERVAL= 2.43 HRS,ART=1.22 HRS,AST=1.21 HRS CONFIRMED SHUBLIK FORMATION TOP AT 9732'MD,8464'TVD(4'DEEP) CONFIRMED TSAD FORMATION AT 9816'MD, 8534'TVD(ON DEPTH WITH PROGNOSIS) 1/19/2013 00:00 - 10:00 10.00 DRILL P PROD1 DIRECTIONAL DRILL6-1/8"PRODUCTION HOLE FROM 9925'MD AT MIDNIGHT TO 10143' MD(218'IN 10 HRS=22 FPH). NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION,100%SAND IN ZONE 4 SAMPLES,60%+CHERT IN ZONE 3 SAMPLES -SURVEYS EVERY 30'DRILLED,SLIDE-15' 10R-50R ON EVERY SINGLE. -254 GPM,1400-1600 PSI ON BOTTOM,1375 PSI OFF BOTTOM,4-12 KLBS WOB SLIDING& ROTATING -40 TOP DRIVE RPM THROUGH BUILD SECTION,123 TOTAL BIT RPM,4-5 KFT-LBS OFF BOTTOM TORQUE,6-7 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.5 PPG,VIS IN/OUT=41 SEC/QT -TOTAL DRILLING HOURS FOR TIME PERIOD =4.26 HRS,SLIDING=2.44 HRS,ROTATING= 1.82 HRS CONFIRMED TCGL(ZONE 3)TOP AT 10075' MD,8698'ND Printed 2/25/2013 10 56 42AM North America-ALASKA-BP Page 49 of 61 Operation Summary Report -`" "‘ Common Well Name.02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.12/7/2012 End Date 1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 18:30 8.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 10143'MD TO 10260'MD(117'IN 8.5 HRS=14 FPH). NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION, 60%+CHERT IN ZONE 3 SAMPLE -SURVEYS EVERY 30'DRILLED,SLIDE—15' -10R-45R ON EVERY SINGLE. -254 GPM,1700-1800 PSI ON BOTTOM,1450 PSI OFF BOTTOM,12-14 KLBS WOB SLIDING &ROTATING -40 TOP DRIVE RPM THROUGH BUILD SECTION,123 TOTAL BIT RPM,4-5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.5 PPG,VIS IN/OUT=42 SEC/QT -TOTAL DRILLING HOURS FOR TIME PERIOD =6.06 HRS,SLIDING=1.9 HRS,ROTATING= 4.16 HRS UNABLE TO MAKE CONSISTENT FOOTAGE. DECISION WITH ANCHORAGE ODE TO TRIP OUT OF HOLE TO CHECK BIT AND BHA. SLOW PUMP RATES AT 11:30,8.5 PPG MUD, 10175'MD: MP#1: 20 SPM=435 PSI,30 SPM=565 PSI,40 SPM=740 PSI MP#2: 20 SPM=440 PSI,30 SPM=580 PSI,40 SPM=750 PSI CONFIRMED BCGL(ZONE 2)TOP AT 10163' MD,8760'ND 18:30 - 19:00 0.50 DRILL P PROD1 FLOWCHECK WELL PRIOR TO PULLING OFF BOTTOM(STATIC). PREPARE TO PULL OUT OF HOLE. 19:00 - 00:00 5.00 DRILL P PROD1 PULL OUT OF THE HOLE WET FROM 10260' MD TO 7"LINER SHOE AT 9692'MD. PICKUP WEIGHT OFF BOTTOM=180 KLBS, SLACKOFF=155 KLBS. NO ISSUES IN OPENHOLE. FLOWCHECK WELL AT 7"SHOE (STATIC). PUMP DRY JOB AND BLOWDOWN TOP DRIVE. PULL OUT OF HOLE FROM 9692' MD TO 5000'MD AT MIDNIGHT,RACKING BACK 4"DRILLPIPE AND MAINTAINING CONTINUOUS HOLE FILL. 1/20/2013 00:00 - 02:30 2.50 DRILL P PROD1 TRIP OUT OF HOLE FROM 5000'MD AT MIDNIGHT TO 600'MD,RACKING BACK 4" DRILLPIPE(RADIOACTIVE SOURCE IN MWD TOOLS 300'MD BELOW GROUND LEVEL). 02:30 - 03:00 0.50 DRILL P PROD1 PRE-JOB SAFETY MEETING FOR CHANGING OUT BHAAND HANDLING RADIOACTIVE SOURCES. PULL HYDRAULIC SLIPS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 50 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.98(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 06:30 3.50 DRILL P PROD1 RACKBACK AND LAYDOWN BHA FROM 600' MD TO SURFACE. INSPECT WELL COMMANDER CIRC SUB AND CONFIRM ALL PORTS CLOSED. REMOVE RADIOACTIVE SOURCE FROM DENSITY NEUTRON MWD TOOLS. GRADE BIT 4-8-RO,IN GAUGE(SEE ATTACHED PICTURES). LAYDOWN MUD -MOTOR AND ADN. DISCOVER PORTED FLOAT PADDLE MISSING FROM PORTED FLOAT IN TOP OF MOTOR. 06:30 - 08:00 1.50 DRILL P PROD1 MAKEUP AND SCRIBE IN HOLE WITH 6-1/8" DIRECTIONAL DRILLING ASSEMBLY TO BHA OVERALL LENGTH AT 252'MD(BHA#13 FOR WELL). TOTAL BHA BUOYANT WEIGHT IN 8.5 PPG POWERPRO MUD=8 KLBS. -NEW 6-1/8"HUGHES VM-R18DX INSERT TRI-CONE BIT,SERIAL#5213243 -4-3/4"1.5°BENT AD(AIR DRILL)MUD MOTOR WITH PORTED FLOAT -4-3/4"MWD TOOLS INCLUDING DIR/GR/RES/DEN/NEU(REPLACED ADN, RE-RUN IMPULSE) WELL COMMANDER MULTI-CYCLE CIRC SUB AND HYDRAULIC DRILLING JARS 08:00 - 09.00 1.00 DRILL P PROD1 TRIP IN HOLE FROM BHAAT 252'MD TO 1011' MD. 09:00 - 09:30 0.50 DRILL P PROD1 BREAK CIRCULATION AND SHALLOW TEST MWD TOOLS(PASS) -254 GPM,845 PSI(SAME AS LAST RUN) 09:30 - 10:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE AND OTHER RIG EQUIPMENT. FUNCTION ALL BOP COMPONENTS. 10:00 - 11:00 1.00 DRILL P PROD1 HOLD FIRE AND RIG EVACUATION DRILL WITH BUCKLER CREW. DISCUSS LESSONS LEARNED DURING AAR. 11:00 - 13:30 2.50 DRILL P PROD1 TRIP IN HOLE FROM 1011'MD TO 2175'MD. UNABLE TO OPERATE IRON ROUGHNECK TRIP IN HOLE USING MANUAL RIG TONGS. BEGIN TO TROUBLESHOOT. 13:30 - 14:30 1.00 DRILL N RREP 10,260.0 PROD1 TROUBLESHOOTAND REPAIR IRON ROUGHNECK(ST-80). DISCOVER BROKEN ELECTRICAL WIRE AT REAR OF UNIT. 14:30 - 22:00 7.50 DRILL P PROD1 TRIP IN HOLE FROM 2175'MD TO 6875'MD, MAINTAINING CONTINUOUS HOLE MONITORING WITH TRIP TANKS. FILLING DRILLPIPE EVERY 10 STANDS. 22:00 - 22:30 0.50 DRILL P PROD1 HOLD UNNANOUNCED KICK WHILE TRIPPING DRILLAND AAR WITH RIG CREWS. 22:30 - 00:00 1.50 DRILL P PROD1 TRIP IN HOLE WITH 6-1/8"DRILLING ASSEMBLY FROM 6875'MD TO 8025'MD AT MIDNIGHT,MAINTAINING CONTINUOUS HOLE MONITORING WITH TRIP TANKS. FILLING DRILLPIPE EVERY 10 STANDS. Printed 2/25/2013 10 56 42AM North America-ALASKA-BP Page 51 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/me:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/21/2013 00:00 - 03:30 3.50 DRILL P PROD1 TRIP IN HOLE WITH 6-1/8"DRILLING ASSEMBLY FROM 8025'MD AT MIDNIGHT TO 10214'MD(45'OFF BOTTOM),MAINTAINING CONTINUOUS HOLE MONITORING WITH TRIP TANKS. FILLING DRILLPIPE EVERY 10 STANDS. NO ISSUES ENTERING TOP OF 7" LINER OR TRIPPING THROUGH OPENHOLE. 03:30 - 04:00 0.50 DRILL P PROD1 WASH DOWN FINAL STAND FROM 10214'MD TO PREVIOUSLY DRILLED TO DEPTH OF 10260'MD. -190 GPM,800 PSI,40 RPM,5 KFT-LBS TORQUE, -PICKUP WEIGHT=180 KLBS,SLACKOFF= 150 KLBS,ROTATING=163 KLBS SLOW PUMP RATES AT 03:30,8.5 PPG MUD, 10260'MD: MP#1: 20 SPM=387 PSI,30 SPM=514 PSI,40 SPM=680 PSI. MP#2: 20 SPM=387 PSI,30 SPM=515 PSI,40 SPM=675 PSI 04:00 - 11:00 7.00 DRILL P PROD1 DIRECTIONAL DRILL AHEAD IN 6-1/8" PRODUCTION HOLE FROM 10260'MD. NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION,ZONE 2 -SURVEYS EVERY 30'DRILLED,SLIDE-15' 30R-55R ON EVERY SINGLE. -254 GPM,1700 PSI ON BOTTOM,1450 PSI OFF BOTTOM,18-22 KLBS WOB SLIDING& ROTATING -40 TOP DRIVE RPM THROUGH BUILD SECTION,123 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-6 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.5 PPG,VIS IN/OUT=40 SEC/QT -ACTUAL DRILLING TIME DURING INTERVAL= 4.28 HRS,SLIDING=2.07 HRS,ROTATING= 2.21 HRS OBSERVE 3 BBL PIT GAIN WHILE DRILLING AHEAD. FLOWCHECK WELLAND CONFIRM FLOW. SHUT-IN WELL AT 11:00 PER STANDING ORDERS AND MAKE PROPER NOTIFICATIONS(SEE ATTACHED AOGCC BOP USAGE FORM). DISCUSS PLAN FORWARD WITH ANCHORAGE TEAM. 0 PSI SIDP AND 0 PSI SICP. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 52 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 16:30 5.50 DRILL N DPRB 10,400.0 PROD1 LINE UP TO MUD GAS SEPARATOR AND CIRCULATE BOTTOMS UP THROUGH FULLY OPEN CHOKE AT 3 BPM. INITIAL CIRC PRESSURE=543 PSI,FINAL=518 PSI. NO PIT GAIN OR INCREASE IN FLOW DURING CIRCULATION. SHUT DOWN PUMPS AND CLOSE CHOKE. PRESSURE CHECK WELL (NO PRESSURE). OPEN ANNULAR PREVENTER AND FLOWCHECK WELL (STATIC). AFTER OPENING WELL,MOVE PIPE DOWN. PIPE IS FREE WITH NORMAL 150 KLBS SLACKOFF WEIGHT. PICKUP PIPE WITH 5 KLBS OVERPULL,185 KLBS. PIPE IS FREE. RETURN TO NORMAL OPERATIONS. 16:30 - 00:00 7.50 DRILL P PROD1 DIRECTIONALDRILLAHEADIN 6-1/8" PRODUCTION HOLE FROM 10400'MD TO 10560'MD AT MIDNIGHT(160'IN 7.5 HRS=21 FRH). NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION,ZONE 2 -SURVEYS EVERY 30'DRILLED,SLIDE—15' 20R-45R ON EVERY SINGLE. •-250 GPM,1450-1500 PSI ON BOTTOM, 1375-1400 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING&ROTATING -40 TOP DRIVE RPM THROUGH BUILD SECTION,123 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-6.5 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.6 PPG,VIS IN/OUT=41 SEC/QT -DILUTE ACTIVE MUD SYSTEM WITH 50 BBLS NEW MUD -ACTUAL DRILLING TIME DURING INTERVAL= 4.83 HRS,SLIDING=3.33 HRS,ROTATING= 1.5 HRS SLOW PUMP RATES AT 8.6 PPG MUD,10560' MD: MP#1: 20 SPM=437 PSI,30 SPM=557 PSI,40 SPM=718 PSI MP#2: 20 SPM=434 PSI,30 SPM=557 PSI,40 SPM=718 PSI 1/22/2013 00:00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILLAHEAD IN 6-1/8" PRODUCTION HOLE FROM 10560'MD TO 10662'MD. NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION -SURVEYS EVERY 30'DRILLED -250 GPM,1400-1550 PSI ON BOTTOM,1400 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING &ROTATING -40 TOP DRIVE RPM THROUGH BUILD SECTION,123 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-7 KFT-LBS ON BOTTOM TORQUE. -MW IN/OUT=8.5 PPG,VIS IN/OUT=43 SEC/QT 06:00 - 06:30 0.50 DRILL P PROD1 SERVICE RIG-TOP DRIVE AND BLOCKS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 53 of 61 Operation Summary Resort ; Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 12:00 5.50 DRILL P PROD1 DIRECTIONAL DRILL AHEAD IN 6-1/8" PRODUCTION HOLE FROM 10662'MD TO 10819'MD. NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION -SURVEYS EVERY 30'DRILLED -250 GPM,1400-1550 PSI ON BOTTOM,1400 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING &ROTATING 40 TOP DRIVE RPM,123 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-7 KFT-LBS ON BOTTOM TORQUE. -PU/WT=178K, DN/WT=155K, RTNVr= 165K MW IN/OUT=8.5 PPG,VI$IN/OUT=43 SEC/QT -ACTUAL DRILLING TIME DURING INTERVAL= 6.39 HRS,SLIDING=4.11 HRS,ROTATING= 2.28 HRS, TOTAL BIT=15.50 HRS, JAR=31.8 HRS. 12:00 - 00:00 12.00 DRILL P PROD1 DIRECTIONAL DRILL AHEAD IN 6-1/8" PRODUCTION HOLE FROM 10819'MD TO 11131'MD. NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION —. -SURVEYS EVERY 30'DRILLED -250 GPM,1400-1550 PSI ON BOTTOM,1400 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING &ROTATING -40 TOP DRIVE RPM,123 TOTAL BIT RPM,5 KFT-LBS OFF BOTTOM TORQUE,5-7 KFT-LBS ON BOTTOM TORQUE. -PUNVT=176K, DN/WT=144K, RTNVT= 159K -MW IN/OUT=8.5 PPG,VIS IN/OUT=43 SEC/QT -ACTUAL DRILLING TIME DURING INTERVAL= 6.4 HRS,SLIDING=2.8 HRS,ROTATING=3.6 HRS, TOTAL BIT=21.9 HRS, JAR=38.2 HRS. 1/23/2013 00:00 - 08:30 8.50 DRILL P PROD1 DIRECTIONAL DRILL AHEAD IN 6-1/8" PRODUCTION HOLE FROM 11131'MD TO 11458'MD. NO LOSSES TO FORMATION WHILE DRILLING. -IVISHAK FORMATION -SURVEYS EVERY 30'DRILLED -250 GPM,1400-1550 PSI ON BOTTOM,1400 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING &ROTATING -40 RPM,5 KFT-LBS OFF BOTTOM TORQUE, 5-7 KFT-LBS ON BOTTOM TORQUE. -PU/WT=179K, DN/WT=149K, RTNVT= 155K -MW IN=8.6 PPG, MW OUT=8.7 PPG -ACTUAL DRILLING TIME=3.73 HRS,SLIDING =1.73 HRS,ROTATING=2.92 HRS, TOTAL BIT =26.55 HRS, JAR=42.9 HRS. 08:30 - 10:00 1.50 DRILL P PROD1 CIRCULATE BOTTOMS WHILE ROTATING AND RECIPROCATING -250 GPM,1450 PSI,60 RPM,5K TORQUE Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 54 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 15:30 5.50 DRILL P PROD1 11458'MD,MONITOR WELL 10-MIN(STATIC), POOH ON ELEVATORS FROM 11458'TO 10840' MD. MAD PASS LOGGING FROM 10840'TO 10466' MD,300 FT/HR MAX PULL RATE. -250 GPM,1450 PSI,40 RPM. -NO PROBLEMS ON TRIP,HOLE FILL VOLUMES CORRECT. -MW IN=8.6 PPG,MW OUT=8.6 PPG _ 15:30 - 17:00 1.50 DRILL P PROD1 CONTINUE TO POOH ON ELEVATORS FROM 10466'TO 9455'MD. MONITOR WELL AT 7"SHOE,WELL STATIC. PU/VT=172K,DN/Wt=1_51K 17:00 - 19:00 2.00 DRILL P PROD1 PJSM WITH WSL,RIG TEAM AND HALLIBURTON REPRESENITIVE TO PICK UP AND SET RTTS FOR PENDING WEEKLY BOPE TEST. -NO LOSSES OBSERVED WHILE MONITORING WELL. -STAGE RTTS TO FLOOR MAKE UP RTTS TO STRING,PU STAND#98 AND RIH -RIH 1STAND TO BIT DEPTH 9569'.RTTS 99-FT BELOW RKB. 19:00 - 21:30 2.50 DRILL P PROD1 SET RTTS AND TEST 250 PSI LOW,1000 PSI HIGH,5 CHARTED MINUTES EACH TEST.ALL TEST PASSING.BLEED PRESSURE BLOW DOWN LINES.LAY DOWN RTTS RUNNING TOOL. 21:30 - 22:00 0.50 DRILL P PROD1 DRAIN BOP STACK.PU 4"TEST JOINT AND MU WEAR RING PULLER,PULL WEAR RING. 22:00 - 23:32 1.53 DRILL P PROD1 RINSE AND FLUSH BOP STACK.REMOVE WEAR RING PULLER,MU AND INSTALL TEST PLUG.FILL BOP STACK,CHOKE LINE,KILL LINE AND CHOKE MANIFOLD. 23:32 - 00:00 0.47 DRILL P PROD1 PRESSURE-FUNCTION TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE, LOU GRIMALDI. -ANNULAR PREVENTER TESTED WITH 4" TEST JOINT. VBRS TESTED WITH 4"AND 4-1/2"TEST JOINTS. -(2)HT38 FOSVS,(1)H138 DART VALVE TESTED. - - -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 55 of 61 Operation Summary Report Common Wet Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/24/2013 00:00 - 08:00 8.00 DRILL P PROD1 CONTINUE TO PRESSURE TEST BOPE TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE, LOU GRIMALDI. ANNULAR PREVENTER TESTED WITH 4" TEST JOINT. VBRS TESTED WITH 4"AND 4-1/2"TEST JOINTS. -(2)MT38 FOSVS,(1)HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. -HYDRAULIC REMOTE CHOKE AND MANUAL CHOKE EACH TESTED TO 1500 PSI FOR LEAKOFF RATE. -ALL COMPONENTS FUNCTIONED FROM CONTROLS IN LER,RIG MANAGER'S OFFICE AND AT ACCUMULATOR UNIT. -1 FAIL PASS TEST ON HYDRAULIC CHOKE VALVE. FUNCTION HYDRAULIC CHOKE AND RETEST,TEST PASSING. -SEE ATTACHED: ASSOCIATED TEST CHARTS AND AOGCC BOPE TEST REPORT. 08:00 - 09:00 1.00 DRILL P PROD1 RD BOP TEST EQUIPMENT. BLOW DOWN CHOKE AND KILL LINES. BLOW DOWN TEST EQUIPMENT. PULL TEST PLUG. -INSTALL WEAR RING. ID=8-7/8" 09:00 - 10:30 1.50 DRILL P PROD1 PU RTTS RUNNING TOOLON STAND WITH HES REPRESENTATIVE. RIH AND MU TO RTTS. -UNSEAT RTTS. VERIFY WELL STATIC. POOH 1 STAND TO RTTS AND LD SAME. CLEAN FLOOR OF RTTS EQUIP. 10:30 - 11:30 1.00 DRILL P PROD1 RIH ON ELEVATORS FROM 9455'MD TO 9641' MD ABOVE 7"CASING SHOE. NO ISSUES,DISPLACEMENTS CORRECT. MW IN 8.6 PPG,MW OUT 8.6PPG. 11:30 - 13:30 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP AT 9641'MD-7" SHOE AT 9692'MD. -245 GPM,1325 PSI. ROTATE AND RECIPROCATE 10 RPM WHILE CIRCULATING. NO LOSSES DURING CIRCULATION. MONITOR WELL PRIOR TO RIP IN OPEN HOLE. WELL STATIC. 13:30 - 16:30 3.00 DRILL P PROD1 RIH ON ELEVATORSFROM 9641'MD TO 11447' MD.NO ISSUES ON TRIP,DISPLACEMENTS CORRECT. WASH LAST STAND TO BOTTOM 11458'MD. PU/WT=181K,DN/WT=151K. MW IN 8.6 PPG,MW OUT 8.6 PPG. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 56 of 61 Operation Summary Report w U, Common Well Name:02-12 AFE No -- Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 22:30 6.00 DRILL P PROD1 DIRECTIONAL DRILLAHEAD IN 6-1/8" PRODUCTION HOLE FROM 11458'MD TO 11728'MD. -SURVEY EVERY 30'DRILLED. -250 GPM,1640 PSI ON BOTTOM,1500 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING& ROTATING. 40 RPM,4 KFT-LBS OFF BOTTOM TORQUE, 5-6 KFT-LBS ON BOTTOM TORQUE. -PUMTr=170K,DNMTT=146K,RT/WT=159K. -MW IN=8.6 PPG,MW OUT=8.6 PPG. -ACTUAL DRILLING TIME=4.03 HRS,SLIDING =0.8HRS,ROTATING=3.23 HRS,TOTAL BIT= 30.58 HRS,'JAR=46.9 HRS. 22:30 - 23:00 0.50 DRILL P PROD1 PULL PS-21 SLIPS DUE TO NOT CLOSING PROPERLY. INSTALL INSERT BUSHINGS FOR HAND SLIPS. 23:00 - 00:00 1.00 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILLAHEAD IN 6-1/8"PRODUCTION HOLE FROM 11728'MD TO 11795'MD. NO LOSSES TO FORMATION WHILE DRILLING. -SURVEY EVERY 30'DRILLED. -250 GPM,1640 PSI ON BOTTOM,1500 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING& ROTATING. -40 RPM,4 KFT-LBS OFF BOTTOM TORQUE, 5-6 KFT-LBS ON BOTTOM=TORQUE. -PUT=170K,DNM/T 146K,RT/WT=159K. /W -MW IN=8.6 PPG,MW OUT=8.6 PPG. -ACTUAL DRILLING TIME=4.03 HRS,SLIDING =0.8HRS,ROTATING=3.23 HRS,TOTAL BIT= 30.58 HRS,JAR=46.9 HRS. 1/25/2013 00:00 - 11:30 11.50 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILLAHEAD IN 6-1/8"PRODUCTION HOLE FROM 11795'MD TO 12155'MD. -SURVEY EVERY 30'DRILLED -250 GPM,1620 PSI ON BOTTOM,1500 PSI OFF BOTTOM,18-20 KLBS WOB SLIDING& ROTATING -50 RPM,5K FT-LBS OFF BOTTOM TORQUE, 7K FT-LBS ON BOTTOM TORQUE. -PU/V T=180K, DN/WT=150K, RTM/T= 159K -MW IN=8.6 PPG, MW OUT=8.6 PPG -ACTUAL DRILLING TIME=6.56 HRS,SLIDING =3.16 HRS,ROTATING=3.40 HRS, TOTAL BIT =37.14 HRS, JAR=53.40 HRS. 11:30 - 12:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 57 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 18:00 6.00 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILLAHEAD IN 6-1/8"PRODUCTION HOLE FROM 12155'TO 12427'MD. -BEGIN TO OBSERVE ERRATIC TORQUE AND DIFFERENTIAL PRESSURE FROM 12410'TO 12427'.BIT DRILLED 2167'TOTALAND SHOWING INDICATIONS OF WEAR AND POSSIBLE UNDER GAUGE.CONSULT WITH TOWN ODE.DECISION MADE TO POOH TO INSPECTAND CHANGE BIT. -SURVEY EVERY 30'DRILLED. -250 GPM,1680 PSI ON BOTTOM -50 RPM,7K FT-LBS ON BOTTOM TORQUE. -P/U WT=179K,DN/WT=146K,RT/WT=159K MW IN=8.6 PPG,MW OUT=8.6 PPG. -ACTUAL DRILLING TIME=3.67 HRS,SLIDING =0.86 HRS,ROTATING=2.81 HRS, TOTAL BIT =40.81 HRS, JAR=57.10 HRS. 18:00 - 18:30 0.50 DRILL P PROD1 TAKE SURVEY AT TD 12427'MD.PREPARE TO POOH FOR BHA CHANGE. -OBTAIN SPR'S MD:12427',TVD: 9058',MW: 8.6 PPG MP#1: 2 BPM=500 PSI,3 BPM=656 PSI,4 BPM=834 PSI MP#2: 2 BPM=505 PSI,3 BPM=649 PSI,4 BPM=820 PSI 18:30 - 20:30 2.00 DRILL P PROD1 CIRCULATE HOLE CLEAN,ROTATING AND RECIPROCATING FROM 12450'MD TO 12440' MD. -250 GPM,1500 PSI,50 RPM,TRQ 5K 20:30 - 00:00 3.50 DRILL P PROD1 MONITOR WELL 10-MIN,(STATIC).POOH ON ELEVATORS FROM 12427'TO 9641'MD. WORK AND WIPE THROUGH INTERMITTENT TIGHT SPOTS WITH OVERPULL 15-20KAT 12106' 12047' 11950' 11601.NO ISSUES AFTER WIPING. REMAINDER OF TRIP LOOKS GOOD. MONITOR WELLAT 7"SHOE(STATIC) MW IN 8.6 PPG,MW OUT 8.6 PPG. PU)WT=179K,DN/WT=146K 1/26/2013 00:00 - 01:00 1.00 DRILL P PROD1 CONTINUE WITH TRIP OUT OF HOLE FROM 9641'MD -PUMP DRY JOB, BLOW DOWN TOP DRIVE -130 GPM,400 PSI. -MONITOR WELL FOR 10-MIN(STATIC). -MWIN8.6PPG, MWOUT8.6PPG. 01:00 - 06:00 5.00 DRILL P PROD1 POOH ON ELEVATORS FROM 9641'TO 350' MD -MONITOR WELL AT BHA.(STATIC) • -NO ISSUES POOH. 06:00 - 08:30 2.50 DRILL P PROD1 PJSM FOR REMOVING RADIOACTIVE SOURCE AND HANDLING BHA. LD BHA,REMOVE RADIOACTIVE SOURCE, LAY DOWN ADN,BIT AND MUD MOTOR. -BIT GRADE:4-8-LT-A-E-3-BT-HRS -NO VISUALANOMALIES OR DAMAGED SEEN WITH BHA. 08:30 - 09:00 0.50 DRILL P PROD1 SERVICE IRON DERRICK MAN,TOP DRIVE AND VISUAL INSPECT DERRICK WHILE DOWNLOADING MWD IMPULSE. 09:00 - 09:30 0.50 DRILL P PROD1 CLEAN AND CLEAR FLOOR.. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 58 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:30 - 10:00 0.50 DRILL P PROD1 MAKE UP 6-1/8"DIRECTIONAL DRILLING ASSEMBLY BHA#14. -ORIENTAND SCRIBE MWD TO MOTOR. LOAD RADIOACTIVE SOURCE INTO ADN. -MW IN 8.6 PPG,MW OUT 8.6 PPG 10:00 - 12:00 2.00 DRILL P PROD1 RIH ON ELEVATORS WITH 4"DP FROM DERRICK TO 728'MD. -P/U WT=53K,DNM/T=47K -DISPLACEMENTS CORRECT. -SHALLOW TEST MWD/LWD TOOLS.TEST GOOD. 12:00 - 21:00 9.00 DRILL P PROD1 CONTINUE TO RIH ON ELEVATORS WITH 4" DP FROM 728'TO 9645'MD. -FILL DP EVERY 10 STANDS. -PU/WT=171K,DN/WT=151K -DISPLACEMENTS CORRECT,NO ISSUES ON TRIP TO 7"SHOE -MW IN'8.7 PPG,MW OUT 8.7 PPG. 21:00 - 23:00 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP ABOVE 7"SHOE 9692'MD. ROTATE AND RECIPROCATE FROM 9645'TO 9565' 250 GPM,1275 PSI,5 RPM, -NO LOSSES DURING CIRCULATION. -MONITOR WELL PRIOR TO RUNNING INTO OPEN HOLE.WELL STATIC 23:00 - 00:00 1.00 DRILL, P PROD1 CONTINUE TO RIH FROM 9645'TO 10689'MD -FILL DP EVERY 10 STANDS. DISPLACEMENTS CORRECT -WORK THROUGH INTERMITTENT TIGHT SPOT AT 10194'MD. -PUM/T=177K,DN/WT=151K 1/27/2013 00:00 - 03:30 3.50 DRILL P PROD1 CONTINUE TO RIH FROM 10689'TO 12320' -- MD. WORKAND WIPE PAST INTERMITTENT TIGHT SPOTS AT 10850'11480' 11558'. FILL EVERY 10 STANDS.DISPLACEMENTS CORRECT. NO ADDITIONAL ISSUES ON TRIP. MW IN 8.7 PPG,MW OUT 8.7 PPG. 03:30 - 04:00 0.50 DRILL P PROD1 FILL DP,BREAK CIRCULATION STAGE UP PUMP TO DRILL RATE, WASH DOWN FROM 12320'TO 12427' -250 GPM,1620 PSI, 40 RPM,4K TRQ -PU/VVT=175K, DN/WT=141K, RT/V T= 154K 04:00 - 12:00 8.00 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILLAHEAD IN 6-118"PRODUCTION HOLE FROM 12427'TO 12678' -SURVEY EVERY 30'DRILLED -250 GPM,1820 PSI ON BOTTOM,1500 PSI OFF BOTTOM, WOB 2-5K -80 RPM,5K FT-LBS OFF BOTTOM TORQUE, 7K FT-LBS ON BOTTOM TORQUE. -PU/WT=180K, DN/WT=149K, RT/WT= 155K -MW IN=8.6 PPG, MW OUT=8.6 PPG -ACTUAL DRILLING TIME=3.69 HRS,SLIDING =1.43 HRS,ROTATING=2.26 HRS, TOTAL BIT =3.69 HRS, JAR=60.8 HRS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 59 of 61 Operation Summary Report Common Well Name 02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 17:30 5.50 DRILL P PROD1 CONTINUE TO DIRECTIONAL DRILLAHEAD IN 6-1/8"PRODUCTION HOLE FROM 12678'TO 12951' FINAL PRODUCTION SECTION TD CALLED 12951'MD,9058'TVD -SURVEY EVERY 30'DRILLED -253 GPM,1920 PSI ON BOTTOM,1550 PSI OFF BOTTOM, WOB 2-5K -80 RPM,5K FT-LBS OFF BOTTOM TORQUE, 7K FT-LBS ON BOTTOM TORQUE. -PU/Wr=175K, DN/WT=144K, RTMIT= 160K -MW IN=8.6 PPG, MW OUT=8.6 PPG -ACTUAL DRILLING TIME=3.33 HRS,SLIDING =2.01 HRS,ROTATING=1.32 HRS, TOTAL BIT =7.02 HRS, JAR=64.1 HRS. 17:30 - 19:00 1.50 DRILL P PROD1 CIRCULATE AND CONDITION FOR MAD PASS AND WIPER TRIP TO 7"SHOE AT 9692'. ROTATE AND RECIPROCATE DURING CIRCULATION. -253 GPM,1650 PSI,80 RPM,6K TORQUE OFF PU/WT=175K, DN/WT=144K, RT/WT=160K MW IN=8.6 PPG, MW OUT=8.6 PPG. 19:00 - 00:00 5.00 DRILL P PROD1 MONITOR WELL 10-MIN(STATIC). MAD PASS LOG,POOH REAMING FROM 12951'TO 11731' MD. MAD PASS PULLING OUT OF HOLE AT 600-FT/HR -253 GPM,1650 PSI,40 RPM -PU/WT=175K, DN/WT=140K, RT/WT= 160K 1/28/2013 00:00 - 05:30 5.50 DRILL P PROD1 MAD PASS LOG,POOH REAMING FROM 11731'TO 10750'MD. MAD PASS PULLING OUT OF HOLE AT 600-FT/HR -250 GPM,1600 PSI,40 RPM,TORQUE 5K -PU/WT=175K, DN/WT=140K, RT/WT= 160K -MW IN=8.6 PPG, MW OUT=8.6 PPG. 05:30 - 07:00 1.50 DRILL P PROD1 POOH ON ELEVATORS FROM 10750'MD TO 9645'MD. -PU/WT=180K, DN/WT=151K. 07:00 - 07:30 0.50 DRILL P PROD1 SERVICE TOP DRIVE AND CONDUCT VISUAL DERRICK INSPECTION. 07:30 - 09:00 1.50 DRILL P PROD1 RIH ON ELEVATORS WITH 4"DP FROM 9645' TO 9820'MD. -PUIWT=170K, DN/WT=151K. -DISPLACEMENTS CORRECT. POOH TO SHOE AT 9692'MD. 09:00 - 11:30 2.50 DRILL N RREP 9,692.0 PROD1 REPAIR RIG,DRAVWVORKS,AND CONTROL SYSTEM. 11:30 - 12:00 0.50 DRILL P PROD1 RIH ON ELEVATORS WITH 4"DP FROM 9645' MD TO 9834'MD. -P/U WT=171K,DN/WT=150K -DISPLACEMENTS CORRECT. -MW IN=8.6 PPG, MW OUT=8.6 PPG. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 60 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:00 - 15:30 3.50 DRILL P PROD1 CONTINUE TO RIH ON ELEVATORS WITH 4 DP FROM 9834'MD TO 12951'MD. -FILL DP EVERY 10 STANDS. -PU/WT=170K,DN/WT=150K -DISPLACEMENTS CORRECT,NO ISSUES ON TRIPTOTD. 15:30 - 19:30 4.00 DRILL P PROD1 12951'MD CIRCULATE AND CONDITION HOLE —CLEAN WITH 2.5 BOTTOMS UP. ROTATE AND RECIPROCATE DURING CIRCULATION.HOLE CLEAN AFTER 2.5 BOTTOMS UP.NO LOSSES DURING CIRCULATION. -253 GPM;,1600 PSI,80 RPM,5K TORQUE PU/WT=180K, DN/WT=150K, RT/V T= 160K 19:30 - 22:30 3.00 DRILL P PROD1 MONITOR WELL 10-MIN(STATIC)PRIOR TO POOH POOH ON ELEVATORS FROM 12951'MD TO 9692'MD.NO OVER PULLS OR ISSUES OBSERVED DURING TRIP TO 7"SHOE. - PU/WT=180K, DN/WT=150K -MW IN=8.6 PPG, MW OUT=8.6 PPG. DISPLACEMENTS CORRECT,HOLE LOOKS GOOD. 22:30 - 00:00 1.50 DRILL P PROD1 MONITOR WELL AT 7"SHOE 9692'MD (STATIC). -BREAK CIRCULATION,ESTABLISH RATE 2-BPM=440 PSI.PREPARE TO FUNCTION WELL COMMANDER CIRC SUB OPEN. -SHUT DOWN PUMP,BREAK OUT TOP-DRIVE,DROP 1.76"CIRC SUB ACTIVATION BALL.MU TOP-DRIVE.13-MIN PASSED PRIOR TO PUMPING BALL TO SEAT. -PUMP 2-BPM,440 PSI.AT 230 STROKES PUMPED OBSERVE 200 PSI DECREASE. SUSPECT WELL COMMANDER HAS SHIFTED OPEN WITH PREMATURE PRESSURE.- AS PRECAUTION FOLLOW TROUBLE-SHOOT FLOW CHART FOR FUNCTIONING VALVE(NO CHANGE).WITH STRING VOLUME TO WELL COMMANDER PUMPED,INCREASE FLOW RATE AND OBSERVE PSI,MWD NOT RECEIVING SIGNAL.VALVE IS OPEN, PROCEED TO STAGE RATES UP TO 500 GPM TO CIRCULATE BOTTOMS UP.NO LOSSES OBSERVED WHILE STAGING PUMPS UP.. 1/29/2013 00:00 - 01:30 1.50 DRILL P PROD1 CONTINUE TO STAGE PUMP RATE TO 500 GPM,OBSERVE FOR LOSSES. - 295 GPM=600 PSI, 336 GPM=710 PSI, 500 GPM=1220 PSI. -CIRCULATE 9-5/8"AND 7"CASING CLEAN. PUMP 644-BBL TOTAL,JUST OVER 1 BOTTOMS UP. -ROTATE AND RECIPROCATE 90-FT DURING CIRCULATION,40 RPM,TQ 4K. -MW IN=8.6 PPG, MW OUT=8.6 PPG -MONITOR WELL 10-MIN AFTER CIRCULATION(STATIC) Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 61 of 61 Operation Summary Report Common Well Name:02-12 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/7/2012 End Date:1/29/2013 X3-012G3-C:(9,728,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:30 - 02:30 1.00 DRILL P PROD1 DROP BALL,1.76"-OD TO ACTIVATE CLOSED WELL-COMMANDER CIRCULATION SUB. -ALLOW BALL TO DROP 5-MIN.PUMP DOWN BALL AT 1.5-BPM,220 PSI. -OBSERVE PSI INCREASE WITH BALL ON SEAT AT 230 STROKES.PRESSURE TO 1000-PSI AND HOLD 30-SEC INCREASE PRESSURE AND OBSERVE WELL COMMANDER SHIFT CLOSED AT 1900-PSI. VERIFY MWD HAS SIGNAL -MONITOR WELL(STATIC) -PUMP DRY JOB,BLOW DOWN TOP-DRIVE -DROP 2.40"-OD DRILL-PIPE DRIFT DOWN STRING FOR UPCOMING LINER CEMENT JOB. 02:30 - 07:00 4.50 DRILL P PROD1 POOH ON ELEVATORS FROM 9645'TO 1960' MD. -PU/WT=72K, DN/WT'=70K -MW IN 8.6 PPG: MW OUT 8.6 PPG -DISPLACEMENTS CORRECT DURING TRIP. 07:00 - 07:30 0.50 DRILL P PROD1 SERVICE RIG,TOP-DRIVE AND BLOCKS. PERFORM VISUAL DERRICK INSPECTION. MONITOR WELL WHILE SERVICING.WELL STATIC 07:30 - 09:00 1.50 DRILL- P PROD1 CONTINUE TO POOH ON ELEVATORS FROM 1960'TO 348' 09:00 - 12:00 3.00 DRILL P PROD1 MONITOR WELL PRIOR TO PULLING NON-SHEARABLE BHA COMPONENTS INTO BOP STACK. WELL STATIC. -PJSM FOR RADIO ACTIVE SOURCE AND BHA HANDLING. -LD NM-FLEX COLLARS.REMOVE SOURCE FROM ADN AND CONTAIN. -LD REMAINDER OF BHA#14.NO VISUAL ANOMILIES OBSERVED WITH BHA. -BIT GRADE:0-2-CT-G-X-I-WT-TD; 524-FT DRILLED; AVERAGE ROP 74.6-FT/HR 12:00 - 13:30 1.50 DRILL P PROD1 CLEAN FLOOR AND CLEAR OF BHA#14. END RON EVENT AT 13:30 ON 1/29/2013. -REFER TO CON EVENT REPORT#1 FOR ADDITIONAL DAILY REPORTS. Printed 2/25/2013 10:56:42AM North America-ALASKA-BP Page 1 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UVVI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 1/29/2013 13:30 - 15:30 2.00 CASING P RUNPRD BEGIN COMPLETION EVENT WITH PARKER 273 AT 13:30 ON 1/29/2013. -RU TO RUN 4-1/2",12.6 LB/FT,13CR-85, VAM-TOP PRODUCTION LINER. -WELL STATIC,MW IN 8.6 PPG,MW OUT 8.6 PPG -WELLBORE BARRIERS:8.6 KWF,TESTED BOPE,TESTED ANNULAR VALVES 15:30 - 17:00 1.50 CASING P RUNPRD PU 4-1/2",12.6 LB/FT,L-80,IBT PRODUCTION SHOE TRACKAND RIH. -APPLY BAKERLOK TO SHOE TRACK CONNECTIONS AND TORQUE TO MARK. -FILL LINER,VERIFY FLOATS GOOD.(OK) 17:00 - 19:00 2.00 CASING P RUNPRD CONTINUE TO RIH WITH 4-1/2",12.6 LB/FT, 13CR-85,VAM-TOP PRODUCTION LINER FROM 127'TO 832-FT -APPLY JET LUBE SEAL GUARD,TORQUE TURN TO OPTIMUM TRQ 4440 FT-LBS -KEEP LINER FULL WHILE RIH.FILL EACH JNT ON FLY,TOP OFF EVERY TEN JOINTS. -DISPLACEMENT CORRECT TO 832-FT -MW IN=8.6 PPG,MW OUT=8.6 PPG 19:00 - 19:30 0.50 CASING N RREP 12,951.0 RUNPRD PIPE CAT NOT OPERATING PROPERLY, TROUBLE-SHOOT,SERVICE AND INSPECT SAME. 19:30 - 22:00 2.50 CASING` N RREP 12,951.0 RUNPRD REPAIR PIPE CAT.CONTINUE TO TROUBLE-SHOOT AND REPAIR. -CIRCULATE ACROSS TOP OF HOLE MONITORING WELL.STATIC LOSSES OF 1.4 BPH. 22:00 - 00:00 2.00 CASING P RUNPRD CONTINUE TO RIH WITH 4-1/2"PRODUCTION LINER FROM 832 TO 2071-FT -APPLY JET LUBE SEAL GUARD,TORQUE TURN TO OPTIMUM TRQ 4440 FT-LBS -KEEP LINER FULL WHILE RIH.FILL EACH JNT ON FLY,TOP OFF EVERY TEN JOINTS. 1/30/2013 00:00 - 03:00 3.00 CASING P RUNPRD CONTINUE TO RIH WITH 4-1/2"PRODUCTION LINER FROM 2071 TO 3392-FT -APPLY JET LUBE SEAL GUARD,TORQUE TURN TO OPTIMUM TRQ 4440 FT-LBS -KEEP LINER FULL WHILE RIH.FILL EACH JNT ON FLY,TOP OFF EVERY TEN JOINTS. -PU/WI=76K, DN/WT=76K MW IN=8.6 PPG, MW OUT=8.6 PPG. 03:00 - 04:30 1.50 CASING P RUNPRD PICK UP BAKER FLEX LOCK LINER HANGER, ZXPN LINER TOP PACKER ASSEMBLY AND MAKE UP TO STAND OF 4"DRILL-PIPE - MIX AND PLACE PAL-MIX -CIRCULATE 100-BBL,STAGE PUMP TO 5 BPM=150 PSI.NO LOSSES DURING CIRCULATION. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 2 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 09:00 4.50 CASING P RUNPRD RIH WITH 4-1/2"LINER ON 4"DRILL-PIPE FROM DERRICK FROM 3492 TO 6669-FT -FILL EVERY 10 STANDS AND CHECK DISPLACEMENT EVERY 5 STANDS ON TRIP IN HOLE. -RIH WITH LINER ON DRILL-PIPE AVERAGE 1-MIN PER STAND(90-100 FT/MIN) DISPLACEMENTS GOOD. -MW IN=8.6 PPG, MW OUT=8.6 PPG. **24-HR NOTIFICATION PROVIDED TOAOGCC FOR PENDING WED 1/30/2013 8:49 AM.EMAIL CONFIRMATION OF REQUEST RETURNED. 09:00 - 09:30 0.50 CASING P RUNPRD CIRCULATE AN ADDITIONAL 100 BBLS AT 6600'STAGING PUMP TO 6 BPM,320 PSI -NO LOSSES DURING CIRCULATION. 09:30 - 12:30 3.00 CASING P RUNPRD RIH WITH 4-1/2"LINER ON 4"DRILL-PIPE FROM DERRICK FROM 6669 TO 9692-FT(7" SHOE) -FILL EVERY 10 STANDS AND CHECK DISPLACEMENT EVERY 5 STANDS ON TRIP IN HOLE. -PU/WT=143K, DNM/T=128K 12:30 - 15:00 2.50 CASING P RUNPRD CIRCULATE ANNULAR VOLUME(-500 BBL)AT 7"SHOE PRIOR TO GOING INTO OPEN HOLE -STAGE PUMP TO 6 BPM,528 PSI. -NO LOSSES DURING CIRCULATION -PU/WT=150K, DN/WT=138K 15:00 - 18:30 3.50 CASING P RUNPRD CONTINUE RIH FROM 9692'TO 12930-FT -RIH AT 1 MINUTE PER STAND AVERAGE. MONITOR RETURNS FOR CORRECT DISPLACEMENT. -RECORD P/UWTAND DN/WT EVERY 10 STANDS. 10558'PU/WT=168K, DN/WT=146K; 11507' PUM/T=173K,DN/WT=143K; 12456'PU/WT =177K,DN/V1/T=143K 18:30 - 19:00 0.50 CEMT P RUNPRD PICKUP BAKER TOP DRIVE CEMENT HEAD, PLACE IN THE MOUSE HOLE,ENSURE TOP FOSV VALVE IS CLOSED AND LOWER FOSV OPEN. -CONNECT TUGGER,CEMENT HOSE AND 90 DEGREE SWING TO CEMENT HEAD. -MU CEMENT HEAD TO TOP DRIVE AND STRING MAKINGATOP DRIVE CONNECTION. 12951'PU/WT=184K, DN/WT=144K 19:00 - 20:00 1.00 CEMT P RUNPRD WITH LINER ON DEPTH AT 12949'MD(2'OFF BOTTOM)STAGE UP PUMP IN 1/2 BBL INCREMENTS TO 3 BPM,504 PSI.CIRCULATE ONE OPEN HOLE VOLUME(-60 BBLS)AT 3 BPM PRIOR TO STAGING TO 6 BPM. RECIPROCATE STRING 20-FT DURING CIRCULATION. -BLOW DOWN TOP DRIIVE AND STAND PIPE. -PU/V T=178K, DN/WT=144K -MW IN=8.6 PPG, MW OUT=8.6 PPG. Printed 2/25/2013 10:57:30AM r „ North America-ALASKA-BP Paget of 1 Operation Summary Report Common Well Name:02-12 AFE No Event Type COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000 00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 CEMT P RUNPRD STAGE UP PUMP RATE TO 6 BPM AS HOLE ALLOWS TO CIRCULATE 1 MINIMUM BOTTOMS UP. 3-BPM=520 PSI,4-BPM=630 PSI,5-BPM= 760 PSI,6-BPM=960 PSI -RECIPROCATE STRING DURING ENTIRE CIRCULATION- PU/WT=172K,DN/WT=140K -WHILE CONDITIONING MUD HOLD PJSM WITH SLB CEMENTERS,BAKER AND RIG TEAM. 352-BBL INTO CIRCULATION OBSERVE INCREASE OF MW TO 8.8-PPG AND INCREASE OF SAND/CUTTINGS OVER SHAKERS. _. -CONTINUE TO CIRCULATE AND CONDITION MUD.1144-BBL PUMPED MW OUT=8.7-PPG, MW IN=8.6-PPG **OUT OF CRITICAL PATH BLOW AIR BACK TO THE CEMENTERS THROUGH CEMENT LINE AND LOW PRESSURE MUD LINE.(ALLARE CLEAR) **PTSM 23:30-HRS, REVIEW CEMENTING PLAN FORWARD HOLD PJSM WITH SLB CEMENTERS,BAKER AND RIG CREW COMING ON TOUR. -1172-BBL(2 BOTTOMS UP)PUMPED MW OUT=8.6-PPG, MW IN=8.6-PPG.PROCEED WITH CEMENT PLAN FORWARD TO TEST RIG -- CEMENT LINES TO 4,500-PSI 1/31/2013 00:00 - 01:00 1.00 CEMT P RUNPRD SHUT DOWN RIG PUMP FROM CIRCULATING THROUGH THE CEMENT HOSE. OPEN VALVE TO THE SCHLUMBERGER CEMENTERS. -PUMP 10-BBL FRESH WATER FROM THE CEMENTERS TO FILLAND WARM LINES. -CLOSE LOWER FOSV ON TD CEMENT HEAD. PRESSURE TEST THE RIG AND CEMENTING LINES TO 4,700 PSI(TEST GOOD) -BLEED PRESSURE AND BLOW DOWN CEMENT LINE TO SLB 01:00 - 02:00 1.00 CEMT P RUNPRD SLB CEMENTERS BATCH MIX 90-BBLS, 15.8-PPG CLASS"G",432 SACKS AT 1.17 CUFT/SK WITH GAS-BLOCKADDITIVE. CONTINUE TO CIRCULATE WHILE BATCHING CEMENT.6-BPM,960-PSI Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 4 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 04:00 2.00 CEMT P RUNPRD SLB PUMP 25-BBL MUDPUSH II AT 12 PPG. PUMP 90 BBLS OF 15.8 PPG CEMENT PER PROGRAM. -CLEAR ALL CEMENT FROM CEMENT LINE AND CEMENT STAND PIPE,NO CEMENT ON TOP OF THE PLUG -DROP DART AND CHASE WITH 85 BBLS of 8.5-PPG PERF PILLAT 6 BPM -RECIPROCATE STRING 20-FT INTERVALS UNTIL MUD PUSH AT SHOE. -UNABLE TO REACH 6-BPM DISPLACEMENT DUE TO RIG LIMITATION OF PROVIDING MUD TO SLB CEMENTERS,DISPLACE CEMENT AT 5-BPM ' -61 BBLS AWAY BEGIN RECIPROCATING PU/WT=188K, DN/WT=153K -SLOW TO 3-BPM WITH NO RECIPROCATING FOR LATCH,OBSERVE LATCH AT 97.8 BBL PUMPED.SLB TRIP KICK AT 2,000-PSI. INCREASE PRESSURE TO 2050-PSI OBSERVE PLUG RELEASE.ATTEMPT TO RECIPROCATE STRING(UNABLE).LINER ON DEPTH AT 12949-FT. TOL=9519-FT -PRESSURE TO 4,300 PSI PER BAKER REP AND RELEASE RUNNING TOOL. • -FULL RETURNS THROUGHOUT CEMENT DISPLACEMENT. -FCP DISPLACING CEMENT AT 5-BPM= 2234-PSI WITH 13%RETURN FLOW -FCP TO BUMP AT 2-BPM=1570-PSI WITH 7% RETURN FLOW. -BAP PLUG ON CALCULATED DISPLACEMENT 149.3 BBL.CEMENT IN PLACE 03:25-HRS -FINAL DISPLACEMENT MATCHES SLB CADE MODEL -TOC ESTIMATED AT TOL,9519'MD BASED ON JOB DETAILS AND IN CONFORMANCE WITH REQUIREMENTS OF GP 10-60. 04:00 - 05:00 1.00 CEMT P RUNPRD BLEED PRESSURE AND CONFIRM FLOATS ARE HOLDING,(NO FLOW) -PU AND EXPOSE DOGS.WEIGHT SET PACKER STACKING 40K DN/WT -RD CEMENT LINE TO BAKER CEMENT HEAD. -CONFIRM PACKER SET WITH 20-RPM ROTATION. -PRESSURE TO 1,000-PSI,PU ON STRING -30' WATCH FOR PSI DROP,OBSERVE RUNNING TOOL IS CLEAR OF LINER WHEN PSI DROPPED. -STAGE PUMP RATE UP AND MAINTAIN 1,000-PSI -LINE UP AND CIRCULATE OUT CEMENT WITH RIG PUMP 10-BPM, 1,160-PSI. -CIRCULATE BOTTOMS UP WHILE RECIPROCATING DRILL-PIPE,NO ROTATION- _ PUM/T=157K, DN/WT=143K 05:00 - 06:00 1.00 CEMT P RUNPRD BREAK OUT BAKER TD CEMENT HEAD AND LD OUT OF STRING. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 5 of 14 Operation Summary Report Common Wet Name:02-12 AFE No Eteot Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:00 1.00 CEMT P RUNPRD CONTINUE TO CIRCULATE EXCESS CEMENT OUT OF 7"x 9-5/8"CASING. -10-BPM,1,030-PSI-RECIPROCATE DURING CIRCULATION,NO ROTATION -PU/WT=158K, DN/WT=143K -27-BBLS TOTAL CEMENT TO SURFACE. EXCESS CEMENT MATCHES CALCULATED. 07:00 - 09:00 2.00 CEMT P RUNPRD DISPLACE WELL FROM 8.6-PPG POWER TO 8.5-PPG SEAWATER -9-BPM,1,200-PSI. -8.5-PPG SEAWATER IN AND OUT 09:00 - 10:00 1.00 CEMT P RUNPRD HOLDAAR ON 4-1/2"LINER CEMENT JOB WITH RIG TEAM AND 3RD PARTY PERSONNEL.: 10:00 - 12:30 2.50 CEMT P RUNPRD POOH WITH LINER RUNNING TOOL ON 4"DP FROM 9,645'TO 4,803` -PU/WT=.108K,DN/WT=108K 12:30 - 13:30 1.00 CEMT P .RUNPRD PERFORM UNANNOUNCED KICK WHILE TRIPPING DRILL(D1).PERFORM HARD SHUT IN PER STANDING ORDER TO DRILLER -HOLD AAR WITH RIG TEAM AND REVIEW DRILL. -BLOW DOWN LINES AND LINE UP ALL WELL _ CONTROL EQUIPMENT. 13:30 - 16:00 2.50 CEMT P RUNPRD MONITOR WELL(STATIC)CONTINUE TO POOH WITH DP FROM 4,803'TO LINER RUNNING TOOLAT 47-FT -PU/Wt=102K,DN/WT=102K 16:00 - 17:00 1.00 CEMT P RUNPRD MONITOR WELL(STATIC)INSPECT BAKER RUNNING TOOL.INDICATION DOG SUB SHEARED. 17:00 - 18:00 1.00 CEMT P RUNPRD SERVICE RIG.TOP DRIVE. 18:00 - 18:30 0.50 CEMT P RUNPRD DRAIN BOP STACK,PULL WEAR BUSHING. 18:30 - 20:30 2.00 CEMT P RUNPRD PU 4-1/2"TEST JOINT AND MU BOP TEST TOOLS.FILL STACK AND REPAIR LEAKING BOP TEST PUMP VALVES. 20:30 - 00:00 3.50 CEMT P RUNPRD PRESSURE-FUNCTION TEST BOPE TO 250 PSI LOW AND 3,500 PSI HIGH FOR FIVE MIN EACH IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BPADWOP STANDARDS. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE, 'JEFF JONES VIA PHONE CALL 22:15-HRS. -(2)HT38 FOSVS,(1)HT38 DART VALVE TESTED. -CLOSURE TIMES FOR BOP COMPONENTS ALL MEASURED. • Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 6 of 14 Operation Summary Report Common Well Name:02-12 'AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UW:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 2/1/2013 00:00 - 05:00 5.00 CEMT P RUNPRD CONTINUE WITH WEEKLY PRESSURE TESTING OF BOPE TO 250 PSI LOW/3,500 PSI HIGH,FIVE CHARTED MINUTES EACH TEST. ALL IN ACCORDANCE WITH AOGCC REQUIREMENTS AND BP ADWOP STANDARDS. WITNESSED:WSL RICK DOLFI,JR RIG -MANAGER JOHNNY GONZALES -ALL TESTS PASSING. -ANNULAR PREVENTER TESTED WITH 2-7/8" AND VBR'S TESTED WITH 2-7/8 AND 4-1/2" TEST JOINT -(2)HT38 FOSV'S,(1)HT38 DART VALVE TESTED. ALL CLOSURE TIMES FOR BOP COMPONENTS RECORDED. -TEST CHART AND BOP TEST REPORT ATTACHED. -ALL COMPONENTS FUNCTIONED FROM LER CAB PANEL,RIG MANAGERS OFFICE REMOTE PANEL AND AT ACCUMULATOR. 05:00 - 06:00 1.00 CEMT P RUNPRD RD BOP TEST EQUIPMENT.BLOW DOWN LINES.PULL TEST PLUG,INSTALL WEAR RING 06:00 - 07:00 1.Q0 CEMT P RUNPRD TEST 4-1/2"LINER x 7"x 9-5/8"CASING TO 250-PSI LOW FOR 5-MIN,3,500-PSI FOR 30-MIN.PASSING TEST. -PRESSURE TEST CHART ATTACHED. 07:00 - 09:30 2.50 PERFOB P OTHCMP RU HANDLING EQUIP.FOR PERFORATING GUNS AND 2-7/8"DRILL-PIPE -LOAD PERFORATING GUNS INTO PIPE-SHED. 09:30 - 10:00 0.50 PERFOB P OTHCMP PJSM WITH RIG TEAM AND SCHLUMBERGER TCP AND 3RD PARTY PERSONNEL ON PU AND HANDLING PERFORATING ASSEMBLY. -REVIEW BRIDGING DOCUMENT FOR"GUNS ACROSS THE STACK" -ENSURE SAFETY JOINT IS PREPARED 10:00 - 12:30 2.50 PERFOB P OTHCMP PU PERFORATING GUNS FROM PIPE-SHED. PU 20-GUNS TOTAL(643.60-FT) -8.5-PPG SEAWATER IN, 8.5-PPG SEAWATER OUT. 12:30 - 13:00 0.50 PERFOB P OTHCMP SERVICED RIG,TDS-11,TRAVELING BLOCK AND WASH PIPE 13:00 - 17:30 4.50 PERFOB P OTHCMP PU SINGLE JOINTS OF 2-7/8"PAC FROM PIPE SHED -RIH FROM 643'TO 1834'-FT -DRIFT ALL JOINTS TO 1.38" -HOLD MULTIPLE 5x5 AND DISCUSSION TO INCREASE SAFETY AND OPTIMIZE HANDLING OF 2-7/8"DRILL-PIPE Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 7 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:30 - 19:00 1.50 PERFOB N HMAN 1,834.0 OTHCMP 2-7/8"JNT OF DRILL-PIPE ROLLED OFF NOV PIPE CAT.SAFETY STAND DOWN, -HOLD INVESTIGATION AND SECURE JOINT. -NO PERSONNEL IN AREA OF IMMEDIATE DANGER WHEN DRILL-PIPE BECAME DISLODGED. -NOTIFY BP AND PARKER HSE PERSONNEL, NOTIFY GWO DRILLING SUPERINTENDENT AND PARKER SUPERINTENDENT. -REVIEW PREVENTIVE MEASURES TO ELIMINATE POTENTIAL REOCCURRENCE AND HAZARD. -REVIEW OPERATIONS AND POST INVESTIGATION WITH RIG TEAM. -PARKER SUPERINTENDENT REMAINS ON RIG TO OBSERVE PU REMAINDER OF 2-7/8" DP. 19:00 - 20:00 1.00 PERFOB P OTHCMP PU 5 JOINTS 2-7/8"PAC FROM 1834'TO 1991'-FT -CHANGE ELEVATORS BACK TO BX-ELEVATORS 20:00 - 22:00 2.00 PERFOB P OTHCMP PU 44 JOINTS 2-7/8"PAC FROM 1991'TO 3374-FT -UTILIZE SINGLE JOINT ELEVATORS AND FORUM CRANE TO LOAD SINGLES IN MOUSE HOLE. -LATCH BX ELEVATORS TO PIPE IN MOUSE HOLE. 22:00 - 00:00 2.00 PERFOB P OTHCMP CONTINUE TO RIH FROM 3374'TO 4355'-FT WITH 4"DRILL-PIPE FROM DERRICK. 2/2/2013 00:00 - 04 00 4.00 PERFOB P OTHCMP CONTINUE TO RIH WITH PERFORATING ASSEMBLY ON 4"-IN DRILL-PIPE FROM 4355' TO 8528'-FT -PUM/T=130K, DN/WT=120K 8.5-PPG SEAWATER IN, 8.5-PPG SEAWATER OUT. -PU/WT=130K, DN/WT=120K DISPLACEMENT CORRECT,NO ISSUES. 04:00 - 04:30 0.50 PERFOB P OTHCMP SERVICE RIG,TOP DRIVE AND BLOCKS. PERFORM VISUAL DERRICK INSPECTION. 04:30 - 05:00 0.50 PERFOB P OTHCMP SPILL DRILL.AAR AND REVIEW OF PROCEDURE WITH RIG TEAM. 05:00 - 08:00 3.00 PERFOB P OTHCMP CONTINUE TO RIH WITH 4-IN DRILL-PIPE FROM 8,528'TO 12,858-FT. TAG UP ON 4-1/2"-IN LINER LANDING COLLAR AT 12,858-FT -PU/WT=174K, DN/WT=145K -DISPLACEMENTS CORRECT. 08:00 - 10:00 2.00 PERFOB P OTHCMP PICKUP AND SPACE OUT ON THE UP STROKE TO POSITION GUNS ON DEPTH. -PU/WT=174K, DN/V T=145K -BOTTOM SHOT=12,850'-FT, TOP SHOT= 12,260'-FT -OBTAIN SPR'S PRIOR TO PERFORATING. CLOSE ANNULAR PREVENTER,LINE UP AND PUMP THROUGH MANUAL CHOKE. PERFORATE THE WELL PRESSURING ON DP IN SPECIFIC SEQUENCE. GUNS CONFIRMED FIRED BY INITIAL LOSSES AFTER OPENING ANNULAR PREVENTER OF 1-2 BBL LOSS. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 8 of 14 Operation Summary Report — Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:00 - 11:00 1.00 PERFOB P OTHCMP POOH STAND BACK 7-STANDS OF 4"-IN DP FROM 12,850'TO 12,229'-FT. -PUMP ACROSS TOP OF HOLE TO TRIP TANK, KEEP HOLE FULL WITH 8.5 PPG SEAWATER. -WELL TAKING AVERAGE OF 1-2 BBL'S PER HR. -PU/WT=172K, DN/WT=141K 11:00 - 13:30 2.50 PERFOB P OTHCMP CIRCULATE A 1x BU TO CLEAR THE ANNULUS AT 12,229-FT -5-BPM, 210-GPM, 1,550-PSI -PU/WT=172K, DN/WT=141K -HOLD MR WITH RIG TEAM FOR PREVIOUS OPERATION OF PU AND HANDLING OF 2-7/8"-IN PAC DRILL-PIPE. 13:30 - 14:00 0.50 PERFOB P OTHCMP MONITOR WELL,STATIC LOSSES EST.2-BPH -BLOW DOWN TOP-DRIVE AND KILL LINE. -INSTALL PS-21 SLIPS FOR LAYING DOWN DRILL-PIPE. 14:00 - 16:30 2.50 PERFOB P OTHCMP POOH WITH 4-IN DRILL-PIPE LO SINGLES TO PIPE-SHED.FROM 12,229'TO 10,838-FT -PUM/T=172K, DN/WT=141K 16:30 - 17:30 1.00 PERFOB N HMAN 10,838.0 OTHCMP BP GWO DRILLING HSE ON SITE TO – -- INVESTIGATE 2-7/8"DRILL-PIPE INCIDENT. -TO OBTAIN INFORMATION,PICTURES AND MEASURMENTS ON PIPE-CAT,STOP WITH LD DRILL-PIPE OPERATIONS. 17:30 - 21:30 4.00 PERFOB P OTHCMP CONTINUE TO POOH WITH PERF GUNS ON 4"-IN DP FROM 10,838'TO 7,579'-FT -PU/WT=160K, DN/WT=143K -HOLE STILL AVERAGING LOSS RATE OF 1-2 BPH 21:30 - 22:00 0.50 PERFOB - P OTHCMP PERFORM UNANNOUNCED SPILL DRILL. CREW REPONSE TIME=2-MIN -HOLD MR AND REVIEW DRILL WITH TEAM. 22:00 - 00:00 2.00 PERFOB P OTHCMP CONTINUE WITH TRIP POOH LD 4"-IN DP FROM 7,579'TO 6,150-FT -8.5-PPG SEAWATER IN AND OUT. -LOSSES MAINTAINING 1-2 BPH. -TOTAL LOSS OF 8.5-PPG SEAWATER TO WELL 10-BBL. 2/3/2013 00:00 - 04:00 4.00 PERFOB P OTHCMP CONTINUE WITH TRIP POOH LD 4"-IN DP FROM 6,150 TO 3,374-FT -8.5-PPG SEAWATER IN AND OUT. -LOSSES MAINTAINING 1-2 BPH. 04:00 - 04:30 0.50 PERFOB P OTHCMP REMOVE PS-21 SPILS,INSTALL MASTER BUSHINGS FOR HAND SLIPS. -SPILL DRLL,MR WITH CREW. -PREPARE TO LD 2-7/8"-IN DP.RU POWER-TONGS FOR LD 2-7/8"-IN DP. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 9 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release.2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 08:30 4.00 PERFOB N SFAL 3,374.0 OTHCMP LAYING DOWN LAST SINGLE JNT OF 4-IN DP TO PIPE SHED,JNT HUNG UP WHILE LD CAUSING PIN END TO ROLL OFF THE PIPE-CAT. -SECURE AREAAND WELL,INFORM GWO BP SUPERINTENDENT,HSE AND PARKER SUPERINTENDENT. -NO INJURIES OR EQUIPMENT DAMAGED. -INVESTIGATE ROOT CAUSE AND CRITICAL STEPS NECESSARY TO PROCEED WITH AUTHORIZATION. -NO ADDITIONAL 4"-IN TO BE LAID DOWN, AUTHORIZATION TO PROCEED GIVEN. PIPE-CAT MODIFICATIONS PENDING PRIOR TO ANY ADDITIONAL 4"-IN DRILL-PIPE,BHA OR DE-COMPLETE OF NEXT WELL BEING LAID DOWN.EMPHASIS ALSO GIVEN ON RIG TEAMS OBLIGATION TO STOP WORK IN ANY UNSAFE CIRCUMSTANCE. 08:30 - 12:00 3.50 PERFOB P OTHCMP MONITOR WELL,LOSSES MAINTAINING 1-BPH. LD 2-7/8"-IN DP TO PIPE SHED FROM - 3,374'TO 1,521-FT -PU/WT=65K, DNM/T=65K --8.5-PPG SEAWATER IN AND OUT. 12:00 - 12:30 0.50 PERFOB P OTHCMP CONTINUE TO POOH LD 2-7/8"-IN DP FROM 1,521'TO 643'-FT -PUM/T=62K, DN/WT=62K 12:30 - 15:30 3.00 PERFOB P OTHCMP CHANGE TONGS AND RU FLOOR TO LD PERFORATING GUNS. -LD PERFORATING GUNS AND ASSEMBLY FROM 643'TO SURFACE.ALL GUNS FIRED. 15:30 - 16:00 0.50 PERFOB P OTHCMP CLEAN AND CLEAR RIG FLOOR. 16:00 - 16:30 0.50 PERFOB P OTHCMP SERVICE TOP DRIVE. PERFORM VISUAL DERRICK INSPECTION. 16:30 - 17:00 0.50 RUNCOM P RUNCMP PULL WEAR BUSHING FOR RUNNING TUBING AND LANDING TUBING HANGER. *RUN COMPLETION PHASE BEGINS 16:30 HRS. 17:00 - 18:30 1.50 RUNCOM P RUNCMP DRAIN BOP STACK MU LANDING JNT,XO AND HANGER.MAKE DRY RUN WITH HANGER. -RIH WITH HANGER ON LANDING JNT,VERIFY HANGER LANDED AT 43.94-FT.MARK LANDING JNT AND LD TO PIPE SHED. 18:30 - 20:00 1.50 RUNCOM P RUNCMP RIG UP TO RUN 4-1/2"-IN,12.6#,13CR-85,VAM TOP TUBING PER PROGRAM. -VERIFY ALL GLM'S AND JEWELRY ARE PROPERLY PLACED. -VERIFY PIPE COUNT CORRECT WITH WSL, DRILLER AND HES REPRESENTATIVE. 20:00 - 20:30 0.50 RUNCOM P RUNCMP PJSM WITH ALL RIG PERSONNEL AND SERVICE REPRESENTATIVES. -DISCUSS TUBING RUNNING OPERATIONS, IDENTIFYING NON-SHEARABLE EQUIPMENT ACROSS BOP STACK CONFIRM PROPER XO'S ARE MADE UP TO FOSV.EACH TEAM 1MEMBER DISCUSSED HAZARDS ASSOCIATED WITH THEIR TASK. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 10 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL©75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:30 - 00:00 3.50 RUNCOM P RUNCMP PU 4-1/2"IN 12.6#,13CR85 VAM TOP PRODUCTION TUBING WLEG,XN NIPPLE WITH RHC-M PLUG,X NIPPLE AND PACKER. -BAKERLOK ALL CONNECTIONS BELOW PACKER. -APPLY JET LUBE SEAL GUARD THREAD COMPOUND TO ALL OTHER CONNECTIONS. -TORQUE TURN 4-1/2",12.6#VAM TOP TUBING TO OPT-4,440 FT-LBS. -DISPLACEMENTS CORRECT. -SEAWATER IN 8.5-PPG IN AND OUT. -DISPLACEMENTS CORRECT. 2/4/2013 00:00 - 10:00 10.00 RUNCOM P RUNCMP CONTINUE,TO RIH WITH 4-1/2"IN 12.6#, 13CR85 VAM TOP PRODUCTION TUBING FROM 1,487"TO 7,965-FT -APPLY JET LUBE SEAL GUARD THREAD COMPOUND TO CONNECTIONS. -TORQUE TURN4-1/2",12.6#VAM TOP TUBING TO.OPT-4,440 FT-LBS. -AVERAGE JNTS RUN AN HR=18-20 JNTS (780-FPH) -MONITOR WELL AND DISPLACEMENTS VIA TRIP TANK.DISPLACEMENTS ARE CORRECT. -SEAWATER IN 8.5-PPG IN AND OUT. -PU/WT=116K, DNMIT=110K 10:00 - 10:30 0.50 RUNCOM P RUNCMP RIG SERVICE-SERVICE TDS-11 10:30 - 11:00 0.50 RUNCOM N RREP 7,965.0 RUNCMP REMOVE HYDRAULIC CYLINDER FROM PIPE-CAT. 11:00 - 12:00 1.00 RUNCOM P RUNCMP CONTINUE TO RIH WITH 4-1/2"-IN PRODUCTION TUBING FROM 7,965'TO 8,007-FT -PU/WT=116K, DN/WT=110K. -DISPLACEMENTS CORRECT RIH. -MONITOR WELL FOR 10-MIN,WELL STATIC 12:00 - 15:00 3.00 RUNCOM P RUNCMP RIH WITH 4-1/2"-IN TUBING FROM 8,007'TO 9,409-FT -PU 219 JOINTS TOTAL -PU/WT=116K, DNMIT=110K 15:00 - 16:00 1.00 RUNCOM P RUNCMP PU 4-1/2"-IN JOINTS FOR SPACE OUT MEASURMENT. -RIH SLOWLY OBSERVE FOR ENTRANCE INTO THE LINER TOP TIE BACK RECEPTACLE (TBR)WITH JOINT 222. -CONTINUE RIH UNTIL WLEG BOTTOMS OUT IN THROAT OF TBR.(25.27-FT IN JNT#222) -LD JOINTS TO PU SPACE OUT PUPS AND . LAND HANGER 16:00 - 17:00 1.00 RUNCOM P RUNCMP -PU SPACE OUT PUPS 19.69-FT AND 7.74-FT, PLACE ONE FULL JOINT(41.48-FT)BELOW HANGER. -PU/WT=130K, DN/WT=120K -MAKE UP HANGER,RIH AND LAND HANGER IN PROFILE. 17:00 - 17:30 0.50 RUNCOM P RUNCMP 4-1/2"TUBING SPACED-OUT AND LANDED, VERIFY HANGER SEATED WITH FMC REPRESENTATIVE AND RUN IN LOCK DOWN SCREWS 17:30 - 18:30 1.00 RUNCOM P RUNCMP RD 4-1/2"-IN TUBING RUNNING EQUIPMENT. -LD THE LANDING JOINT. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 11 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:30 1.00 RUNCOM P RUNCMP RU TO REVERSE-CIRCULATE AND SPOTTING CORROSION INHIBITOR. -RIG UP TO CIRCULATE DOWN THE IA WITH SECONDARY KILL LINE. -VERIFY VALVE LINE UP AND CIRCULATION PATH IS CORRECT. 19:30 - 00:00 4.50 RUNCOM N SFAL RUNCMP PJSM FOR PRESSURE TESTING LINES, REVERSE-CIRCULATE AND SPOT CORROSION INHIBITOR. -PRESSURE TEST SECONDARY KILL LINE. TEST NOT PASSING,NO VISIBLE LEAKS. -CHANGE LEAKING LOW TORQUE VALVE IN SECONDARY KILL.PRESSURE TEST AFTER CHANGING VALVE,TEST NOT PASSING. -TROUBLE-SHOOT SURFACE LINES,ALL PLUG VALVES AND VALVES AT MUD PUMP FOR POSSIBLE LEAKS. -ISOLATE SECONDARY KILL LINE FROM ANNULUS VALVES AND PRESSURE TEST LINE BACK TO MUD PUMP.TEST FAILED. ' - -REPLACE LEAKING PLUG VALVE TO ENSURE SUCCESSFUL 4-1/2"TUBING TEST WHEN REQUIRED. 2/5/2013 00:00 - 03:30 3.50 RUNCOM N SFAL RUNCMP CONTINUE TO TRACE LEAK FOR PRESSURE TESTING SECONDARY KILL LINE TO IA. -IDENTIFY THAT PRESSURE BLEEDING THROUGH MUD PUMP 1 AND 2. -ISOLATE MUD PUMPS,PRESSURE TEST SECONDARY KILL LINE TO IA(PASS) 03:30 - 08:00 4.50 RUNCOM P' - RUNCMP PJSM FOR REVERSE CIRCULATING AND SPOTTING INHIBITED BRINE. LINE UP TO TAKE RETURNS UP THE TUBING AND DOWN FLOW LINE.MONITOR AND ACCURATELY TRACK BBL PUMPED VERSUS BBL OUT. -REVERSE CIRCULATE 145 BBLS OF 120-DEG HEATED 8.5 PPG SEAWATER DOWN IA. FOLLOW WITH 280 BBLS CORROSION INHIBITED 8.5 PPG SEWATER. DISPLACE WITH 190 BBLS CLEAN 8.5 PPG SEAWATER AT 4 BPM,450 PSI. PUMP ADDITONAL 5 BBLS DOWN TUBING TO WASH RI-IC PLUG IN GLM #1 AT 9296'MD TUBING FULL OF CLEAN 8.5 PPG SEAWATER FROM WLEG AT 9525'MD TO SURFACE INNER ANNULUS(IA)HAS CLEAN 8.4 PPG SEAWATER FROM PROD PACKER AT 9400'MD TO WLEG AT 9525'MD IA HAS INHIBITED 8.5 PPG SEAWATER FROM GLM#4 AT 3512'MD TO PROD PACKER AT 9400'MD IA HAS CLEAN 8.5 PPG SEAWATER FROM GLM#4 AT 3512'MD TO SURFACE 08:00 - 08:30 0.50 RUNCOM P RUNCMP DROP 1-7/8"BALLAND ROD TO RHC-M PLUG IN XN NIPPLE 9512'MD. (PULLING TOOL FOR BALUROD ASSY=2"SB/RB,PULLING TOOL FOR RHC-M PLUG=4-1/2"GS/GR) Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 12 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (ft) 08:30 - 12:30 4.00 RUNCOM P RUNCMP PRESSURE UP ON BALLAND ROD TO SET HES 7"X 4-1/2"TNT PRODUCTION PACKER PER HALLIBURTON REP. PRESSURE TEST 4-1/2"PRODUCTION TUBING TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN (PASS,SEE ATTACHED CHART). BLEED TUBING PRESSURE TO 2000 PSI. PRESSURE TEST INNER ANNULUS AND PRODUCTION PACKER TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN(PASS,SEE ATTACHED CHART). BLEED ALL PRESSURE OFF TBG AND IA. OBTAIN AUTHORIZATION TO PROCEED FOLLOWING WELLBORE INTEGRITY TESTING FROM WELLS TEAM LEADER. NOTE: BLEED BACK VOLUME AFTER IA TEST —2 BBLS LESS THAN VOLUME PUMPED TO PRESSURE UP FOR TEST. RESULTING ACTION IS TO MONITOR WELL FOR ONE HOUR. 12:30 - 13:30 1.00 RUNCOM P RUNCMP MONITOR WELL FOR ONE HOUR PRIOR TO SETTING TWC(WELL STATIC) 13:30 - 14:30 1.Q0 RUNCOM P RUNCMP PRESSURE UP TUBING TO 2000 PSI. PRESSURE UPON IA TO 3500 PSI. BLEED ALL PRESSURE FROM TUBING TO SHEAR DCR-1 VALVE IN GLM#4 AT 3512'MD. APPROXIMATE SHEAR PRESSURE=3050 PSI. BLEED ALL INNER ANNULUS PRESSURE. CONFIRM 2 WAY CIRCULATION THROUGH SHEAR VALVE. 3 BPM,300 PSI DOWN TBG. 2 BPM,200 PSI DOWN IA. 14:30 - 18:30 4.00 WHSUR P RUNCMP DRAIN STACKAND INSTALL CIW4"TYPE H TWC WITH TEE-BAR. PRESSURE TEST TWC FROM ABOVE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH(PASS,SEE ATTACHED CHART). PRESSURE TEST TWC FROM BELOW TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN(PASS,SEE ATTACHED CHART). 18:30 - 19:00 0.50 WHSUR P POST RIG DOWN AFTER PRESSURE TESTING TWC. 19:00 - 21:00 2.00 BOPSUR P POST PREPARE TO LAYDOWN DRILLPIPE FROM DERRICK. REMOVE BELL NIPPLE FROM TOP OF BOP STACK. PREPARE FOR LAYING OVER DERRICK. CLEAR AND CLEAN RIG FLOOR. OFFLOAD BRINE FROM MUD PITS. REMOVE SCAFFOLDING FROM BOP DECK THAT WAS IN PLACE FOR INSTALLING HEAT TRACE ON KILL LINE. 21:00 - 00:00 3.00 BOPSUR P POST NIPPLE DOWN BOP STACK. SECURE STACK IN BOP DECK. BARRIERS FOR NIPPLE DOWN OF BOPE: TWC AND 8.5 PPG KILL WEIGHT FLUID ON TUBING SIDE PROD PACKER,8.5 PPG KWF,AND ANNULUS VALVES ON IA SIDE. Printed 2/25/2013 10:57 30AM North America-ALASKA-BP Page 13 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 , End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 2/6/2013 00:00 - 04:00 4.00 BOPSUR P RUNCMP I,NIPPLE DOWN BOP STACK SPACER SPOOLS. LOAD OUT 22'13-5/8"RISER FROM CELLAR TO YARD. STORE(2)SHORT 13-5/8"RISER SECTIONS IN BOP DECK 04:00 - 06:00 2.00 WHSUR P RUNCMP NIPPLE UP FMC 13-5/8"X 4-1/8"5K TUBING HEAD ADAPTER FLANGE. PRESSURE TEST RING GASKET,LOCKDOWN SCREWS AND "TUBING HEAD SEALS TO 250 PSI LOW FOR FIVE MIN AND 5000 PSI HIGH FOR 10 MIN (PASS,SEE ATTACHED CHARTS) 06:00 - 09:00 3.00 WHSUR P RUNCMP NIPPLE UP 4-1/8"DRYHOLE TREE(DOUBLE STACKED VALVES),DISPLACEMENT AND U-TUBE LINES 09:00 - 12:00 3.00 WHSUR P RUNCMP FILL TREE WITH DIESELAND BLEED ALLAIR FROM SYSTEM IN PREP-FOR TESTING, CLEAN AND CLEAR RIG FLOOR,STAGE LUBRICATOR FOR PULLING TWC 12:00 - 13:30 1.50 WHSUR P .RUNCMP TEST TREE,250 PSI/LOW/5-MIN,5000 PSI/HIGH/10-MIN,CHART SAME 13:30 - 15:30 2.00 WHSUR P RUNCMP R/U TO REVERSE CIRC DOWN I.A.&TAKE RETURNS UP THE TUBING.UTILIZING THE FREEZE PROTECT PUMP,SIMOPS LAY DOWN DP FROM DERRICK 15:30 - 17:30 2.00 WHSUR P RUNCMP PJSM,R/U LUBICATOR&TEST T/350PSI/LOW 5MIN,3500PSI/HIGH 5MIN,CHART SAME REMOVE TWC,0 PSI ON TUBING,CAP& SECURE TREE R/D LUBRICATOR 17:30 - 22:00 4.50 WHSUR P RUNCMP RIG UP FOR FREEZE PROTECT. FILL LINES AND PRESSURE TEST TO 250 PSI LOWAND 1000 PSI HIGH FOR FIVE MIN EACH(PASS). WORK WITH FREEZE PROTECTION SKID FOR FIRST TIME AND REVISE PARKER WORK SAFE PROCEDURE. 22:00 - 00:00 2.00 WHSUR P RUNCMP REVERSE CIRC TO FREEZE PROTECT,PUMP 2.4 BPM,W/275 PSI ON THE I.A.AND 75 PSI ON THE TUBING,PUMP TOTAL OF 145 BBLS 90 DEG DIESEL. HOLD AFTER ACTION REVIEW WITH RIG CREW TO CAPTURE LEARNINGS. 2/7/2013 00:00 - 00:30 0.50 WHSUR P RUNCMP BLOW DN LINES TO CONFIRM FLUID PUMPED 00:30 - 01:30 1.00 WHSUR P RUNCMP STAND DOWN FOR NEAR MISS INCIDENT INVESTIGATION(DROPPED OBJECT FROM DERRICK,SEE TRACTION#4348477). 01:30 - 02:30 1.00 WHSUR P RUNCMP OPEN WELL TO U-TUBE 100 PSI TO 0 IN ONE HOUR. CONFIRM NO PRESSURE AND NO FLOWAFTER U-TUBING. WITH 6.8 PPG DIESEL IN PLACE FROM SURFACE TO 2100' MD/TVD,WELL IS OVERBALANCED TO 7.2 PPG FORMATION BY 425 PSI. 02:30 - 04:00 1.50 WHSUR P RUNCMP RIG DOWN U-TUB LINES,RIG UP LUBICATOR TO SET BPV IN TREE. PRESSURE TEST LUBRICATOR TO 250 PSI LOWAND 3500 PSI HIGH FOR FIVE MIN EACH. SIMOPS: LAYING DOWN 4"DRILLPIPE WITH OFFLINE STAND BUILDING EQUIPMENT. 04:00 - 06:00 2.00 WHSUR P RUNCMP PJSM. INSTALLAND TEST VALVE SHOP LUBRICATOR TO 250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR 5 MIN(PASS),INSTALL 4"CIW TYPE H BPV. Printed 2/25/2013 10:57:30AM North America-ALASKA-BP Page 14 of 14 Operation Summary Report Common Well Name:02-12 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/29/2013 End Date:2/7/2013 X3-012G3-C:(3,294,000.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:PARKER 273 Spud Date/Time:11/25/1977 12:00:00AM Rig Release:2/7/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292027700 Active datum:02-12D ACTUAL @75.9ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:00 1.00 WHSUR P RUNCMP 'EMPTY FLUID FROM PITS TO PREPARE FOR RIG MOVE,LOAD DIESEL TO FREEZE PROTECT TANK IN PREPARATION FOR TESTING BPV 07:00 - 09-00 2.00 RIGD P RUNCMP BLOW DOWN MUD SUCTION LINES, TRANSFER LINES AND DRAIN SAME.DRAIN FLUID ENDS ON MUD PUMPS,DISCONNECT LINES AT INTERCONNECTS,CLEAR AND • CLEAN RIG FLOOR,SHOVEL SNOW FROM ROOF IN PREP FOR RIG MOVE. 09:00 - 11:30 2.50 WHSUR P RUNCMP PJSM,FILL AND PURGE LINES FROM FREEZE PROTECTION PUMP TO TEST BPV FROM BELOW THROUGH IA,TEST BPV FROM BELOW TO 250 PSI FOR 5 MIN,ATTEMPT 3500 PSI HIGH TEST,LEAK AT SURFACE FLANGE, TIGHTEN FLANGE AND TEST BPV FROM BELOW TO 3500 FOR 30 MIN(PASS). 11:30 - 12:00 0.50 RIGD P RUNCMP UD LUBRICATOR,'CONT DISCONNECT SERVICE LINES AT INTERCONNECTS IN PREP • FOR RIG MOVE 12:00 - 18:00 6.00 RIGD P RUNCMP R/D ALL CIRC LINES IN WELL HOUSE,CLEAN CELLAR AREA AND INSTALL VALVES AND GAUGES,R/D ALL CIRC LINES AND HOSES _.BETWEEN MODULES AND PREP FOR MOVE, . CHECK COLUMBIA MOVING SYSTEM • 18:00 - 23:00 5.00 RIGD P RUNCMP READY RIG FLOOR AND DERRICK FOR SKID IN AND LAYDOWN,STORE PIPE CAT AND SKID HAUNCH TO STORAGE POSITION,. SECURE TOP DRIVE AND BRIDAL UP. MAKE FINAL DERRICK INSPECTION AND RIG FLOOR INSPECTION. 23:00 - 00:00 1.00 RIGD P RUNCMP SKID IN RIG FLOOR TO STORAGE POSITION. LAY DN MAST ON TO STORAGE RACK WEIGHT OF MAST 4 FT ABOVE RACK 418K, RELEASE RIG @ 23:59 02/07/2013. RIG RELEASE COMMENTS: -ALL TREE AND WELLHEAD VALVES CLOSED TO GAUGES. FINAL PRESSURES T/I/O=0/0/0 PSI -WELLWORK TRANSFER PERMIT CLOSED OUT WITH DRILLSITE OPERATOR -WELL HANDOVER COMPLETED WITH WELLS GROUP -POST RIG WORK PLANNED: INSTALL FLOWLINE AND WELLHOUSE PULL BALUROD AND SET GENERIC GLVS WITH SLICKLINE, PERFORM NEGATIVE PRESSURE TEST, COMPLETE FLOWBACK WITH ASRC. RIG PERFORMANCE FOR FIRST WELL: PLANNED AFE/TARGET DAYS=40 ACTUAL DAYS ON LOCATION FROM FIRST MODULE ON LOCATION TO RIG RELEASE=62 ACTUAL DAYS FROM SPUD=41.58,DAYS PER 10K FROM SPUD TO RIG RELEASE=93.6 Printed 2/25/2013 10:57:30AM VIM ui�v 8om.�N Il ggS uO1i evv �O1m uWi uni Mil 111N Nil Rnm�� 0m 44vv4vv$4 va"e4iN N���o o� N g C Nz N N NNN v2 N N �y O ° ? evW avVco v ',-,, aaev� `vv�v`vv " eea8 a J '4 2: ' :V<<Y Q O Y . V e e 2 0 O v 2 2 !MI 40m40m 2xm 2 icP^OOOLU ONO 4040p' rni° 140N MI; WlM mmO J MyNMM MyWng mnnin nen m m2888AA00Oxm.vN.v WOqWS2822Sc$222 SSqq.2002402 2ASwwNNpm4 401mWW m ....y NNNN. ....N N N.... NN.. s N. NNNN PPPAP PPPPP PAAPP AAPPP PPPPP pPppP CCpPPP P P P P N M FPGFPG,1328 Op M N r A h b {{pp aa yy pp pp mp ♦�p.ry N' F 40 0 40 0 n Yf28 O1)m0 7.;4 r W f`01!V W 0[108{0 W Sa V 84P O V 4040 z 5ii iii :::::;2 N ppOM Pmam m{t7b SLUE L n OySEI mtAMmWmmb min 0mmmn min igm Wail Win mmi OmNNNNY O♦♦13OVpp74n 8nY1V.'; 31342 ',208M 2mm9,1 F;18.1> Will0 InFa nggnrq; O��M''MOMgIWi ORtp�)tp7i pR{ifmOyl�phy�gn WiRgai m000�Wp N r ool�l Mf�17 f�M f70t�i t�i t717 X17 $ EMI 8;11II Mil Hill Dill rnim'i N�ph Y�1YWOi yY1N NY1 NNN rf1 Yi Y N Nmm bbMhN 1iiii tN��m H b YN uQ�mu� ojd-¢88OM 00000 0NNr0 00000 (°0000 00000 200110 BNU); O.2 0 0 m 0 0 0 0 0 0 00000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 N w .W/0. c ca CD 3s888on 90000 000uU Uo`2i22 i:21APS 1..`er{'n:4 en222 2224 GA w o00o0 90000 000.-N eirivari uiwmmw nwnwn A mn w"u,2 m= E m- MnnvM n•-p�Ap MW�p 40 n pro W.7.432.7 0408 ,-e82 - 2 P 8 8 8 0 N N O M n n 40 40 8 8 M t0 N 2 n b 0 . p 2 m W W /= 3 00000 00999 994'''' NT.// 1/4.".. ,19..° .?°'F� NN p C/3 N If e",, .0.. .. m m '' N :200800 0008FS;2242 U4o 4:8<A 100 828 ser: ggiAt; O csi =HOa1 N q_00000 00 0•-'-'-UI MDoww, wwWmo comma,* Om,O� NNMON 5 Y §;= t0Not;2or= E05 $ N 1 Q 0 K P A R 8 M m 4 m 4 o R 3 9 gr2886A 00'68' F,S>mo V22,2 282.P 8'408' 88'mM A412; 00000 ,NNEI V ww 1!0010000 ' NNMM r1 Q o z O 5Eo 0 W N ° X m ° f o .h f 'il � �E w E d i c yl 9 0 0 �s c 0 (_� O W.4 D- GG m m p� �p tV�p �p T 42 V�OOWC1LLUQa221�Y UK0800N s18"S m8dl0A ppp40my 0{0°Nmmm ppppW,WWm 22y�^ p O m OD W nf7 W W Nf rdm�NO A I�mON N Ah{Ny J p.p,,q, 0 ge00 ).9 ' OOOQR Q9000 O4-,�N O{01n00 I,w,WM 40100001 gWOr� NNNN QQ�� Q 8 1 0 51?D0 A 0 T °a i i g C 8 y y N Wren-4..: 1 40 ..L.0 2 C? L z400$ gm$.lA' m mV, a ›.. e, m>° yffHlOf 2t7H2, 41 y o p qp• pp nn mnWmmw w 47484 �� 40888 8SOS0 88800 OI O�O�W di a.01 OniNm �ONA ZQ f PON 0000n oo mm mocomm °i Oim f TOy 0020)120{pdM GOOW 0, '''^^ 1f 11 r0 nm W O^ :Inn ACD�NN tV tM�r Ntmurn° NN NN SAt�ICf Q N m^mpp NNNN NNN�-�- 00 00000 pppp O1 iDO Q1 N p E288S V O^w-1:; `'V O ""V V 9 0 .000 008 V O O V O V V aS8r2 wMwN 0 H u.2" nn AnnnA E,. � f'r'o Zi nn IM �} u� n M O m rp n m W 0 �r N N N N N �N{V N N N N N(�l G Y „..,0 nO�j O' 3L0881W1M MBeOm gC70fs'10 43153 .1 0^400[222 004PM NVR$0 hi080i V. � 6 000.0 7FW2 �$m , vo.�m �o a4 F4r72F meM-1 �v�� a w g e m ca;m C W ^ V M V M°'gmi '2088888 $:°888 5�8:. 3UMM�i '8�&T V�PFW ««8SP. 4508 r ?' $ r �0'h 00000 00000 00000 00000 00000 00000 po.vro I'-w0w O N• 8 ttVV iy. <�Mr0�0� i L 4 N e94 H N ?�0 n M N I N 126a26,61b"-miN222�o Fz8S888 88888 88888 88888 88888 888888 ;°888 MI 8088 o woo. .4000 4088lii SBA i8 0] 1 ID m p 4 t0 0 C p F/ W m GWG 0. N L4. 5 2,2 >u 2 S /1 O j U U LL 0 E s ?_ m ma. X F°. E a V 'I c yC Y wI 'C CU LLN Tim Q010Y°�UJJ UC7 3 0 i3 9 W•iN1W h TOnRF m ry�NNtOitNg�E�tmuuuupp��fI O{OOttDppp� W OV- n 0 tWDRNWRN�^pd�i uu pAHN hEtmm$ 44J TM41 YYYmm a+aa ddY 444'O4 -.4OTOOOOTO4444man TT444 'V ' " 0000 W4TQY TOYVQ4444Y 2an4 2 ' ' m88,7rn NOM.- h02 Nh00.rm2pdazWArAWWp.173 , iLTs8NN1N' WkSon !lila mN8NN NN4NW NNgg. NRW 4m4,44 NN N NfOma7 r � O 44444 O n O n^ ^4 0 0^ 44444 00000 44444 n^n00 44444 GGCGO 44444 OOOOO4444 o M 1Y WOpV hmN mW ibnO V OAtp 4.mm n^A W 8 r mm MBm mPgP•O m -?On 2 o P-DO N N 1;8ON)Y Nm NNW O 2^OnA ?MO4ttg mSmm5 m2iiE mGlG Ti ig NRI2 •1E3 F-WE WWm^m W0WDWWWmAm b MWO WbttD OWmm8 m0pn0 tRm02 1/111 DmmmW1191 GtO. OOOSYIYP 1132681!! 2681 MP'm'ap h 0081;a �4+jhOpNtn N`8+08N M.7 oOr NI M1; m040d. 00 h d OtgN '4t .8m iEg[p Ol ER m r at>F) Op/{OWryyi OR RANm 2EERE NM Oi�'W W Ot8 m14DOm) 2;2" +bh atmn NN gwg gggi 0�0 � �� an�i$8� Nf to�ln 0000 NOOO 0000' O OO O OO CCW NBW Z iigm u m mug mil m sgg §§m m;§ egg ���� as2I tO NNNNN NW yN W hN tY��f Mf WtONmN Neff�O tlfh tt)ipptl v1 W iO p.�0mmNHN gyp.N t�0NYf tp to NNN. �O Y Olo W m Nl.+FO O W n 81118 tO .w ANQ N t01.t+mV n 001mFr MAtD� ngt7n r NNONM Oam0 .- 00001 O M N a7 f n Y O 1 N O Q m N.7 Q D Oto Oj+tO tDn .0tH aM PI lV PI CI NN �NNIV N �-'- NIV IV NN NN•-N0 O0�-00 CGO•-� 0000 EA NNN TA146 4.1 14 W m.4a mYNt:g 90N4. 0 OO--401 4E2CM Mn V-NO Wa7dV SngnWp'Wmg mNmn NNpY M222 8286 �' N7 'gmH HERE REHR HRH OOiN+ +N14-1 OYNN 228 V AMppA 82288 88 A 8N 44,'.144 p Nan 8'8424 4:2884 0008. 824 O2$OM P.848 844" 4" G 3"". o 0 8s ”2111 1 m8 $ N fi NN E nN N RN E y�. R,0 A 0 Rg71g84 81" N N tt� •� m y� tp tp �p tp W 0�0� V+ {� m X tNtOO O g O h AW A P aro X pNp�� 8'2484 2�p g V f1V 12 V OOi tQO S g O 2 V.=" 1I��I�tO r��� V SOAOayf•0p�y8Ol tmr ur9 HMI p81{g.7 .9,1=g;;;{p g 1081 Y J1 A�mO I S;s 01 0 °2 2{4.7 N M 42222 44 SSl W O'2 484 N 2848 NNNIo`H mNN;7,8 MM RIA H Nd I OTiW,Q Yf 'aim tN0 hMf tO tO tSO tD tmO trO iWOnr N 9 N sew nmnenm G winNgn ?F!AATi A nryg`Oiowr:mry 2241,3g 4'-=';;g8 ';m8 R8, g nm ni+n gMo2w nnnwm 8 g.% 9 d 422m ApO F`pWT mWNSh NNmNM CRMMM MffV mnPpNNY mWmEm EWW W EgM WssO e 88847, 8mA788.t;88 84848 Nvam 88448 AWW22 Ae2W A8 82488 NNmO WpG+4 ANTe=T2444 j 4V28 A828 N7'2O8 88"2 NNNNn MERA EAUY YMWOENOS bEEEE Sm ((VV tp �y{�l V Yf pf tp m O t+�•�p ap Oyes RITZe4 r W 248 t�M 1,)oOtg 201 +NNB{8p FA S%tg pN� g W 1Q.a�O bN,Ot7 T'Wd't•)Ot0 Sg.14N O 00 V V O GT;11 N 68 RN OnANQ 8q�m[7 t7 W�t�N m ONtO 1Y.01 W<tO W O M N�W m my`� gN gt�m00 Oro�l7 iO4mt'�tN N A W�N A awn INI at�id`t�tnn nnt�irii t`nS a`3 a'o`3n nal BnN REUR aAi epic t�S+ t7i�+i t°+'idd QeQee ddddY Yva`�Q v � Wi°l tgS2811M 6-3881-: nmQ28 tm8At 7,8 8,7,88P 233244 $111;J.°211 'mma.+P '�et�ot")nn e`y'i r6,13m 22.7,24 N 26- $ 8mggm MPR R � 3� AAAAB As 42444 mnn m4ARR Pm n 848 gSBSS4 54.7.7.7 .7.744 4.Q4 gE8 44228 NNStnh 4482A 24088 VN884 28N88 oAGIWW V4804 24248 NNNN 4 3:244 Ag.°284 p=00 NNpANl gggglm Nq800 poppSMl7M'gBNo2n pMMpp pp222 nnNOn N Ng 76E 8 trraa.114 7448Q V.;'41 -! ?2044..14 t'42°2l:tA VV.:P8 !=88Wg 817,18%3 '49488 S$g8R `48x48 t4W.)18 - 77Vi` r 2°. 4W 444Ao 44442 NHnNr p Fh ti t7 7'828 Ann'n ;;AAAP, AN,-88N NNNN =S 88888 88888 8888 888 8 80005 88880 88888 88888 80888 88888 88888 8880 NAS O OtM 8"'8 Nhn ON hG '94S' 0OY)0o "'g 8108'42 "'4 882128 N MINn aPE 2222s REt R Esgag ^ t $RR Mzi.7 .7.7447 evt.�a.h4 S1e4T taWdt0 N y 0 ii VnOAI� RV AfI. OOOInh�InAV mmI^AYmAA poHP NMHH EHP n V p 4 2 2 2 N 3m^ mPH: §8m/ 1(I 1nRCV 8AAnPAw -OOA4 ' HpmS 8 6Mvn DO - bAp0AdPfCiAy44 INp w4d44 Pndd POO4dd OdA m 14Of0 4444 44444 44444 44444 44444 44an44 44444 mOVOm OdT40 44444 W444 RVA. w1p N O w A n r ;Magi A w m N N O w A r M N P AAA S w /4 2C RpI ISRm P w A pI n P]♦w OI Pl4 t9in Pla dNm AtO b A PAAAS N �^dl% l7 mA 1pN �PImM ('7 A E � �� � ABn a mm% t� LAgE A®F,Ns1 EAEEs --"2 Pn � $y E T W nnnAb Nten d � .�,inNNN n g�p' •� mmtdnAyo{ � IR �NN� m ISA I��. mAmtnom n/m.{I�p�p nA n nNw l��np iia trci m�p. s �p ${��f{��(fR Eggs J N N NNN N N NI N N N ry NNN N N NNN N N NNN N N N N N N N N ry N N ,I N NNN N N NNN N N N I:woAnw PPRRP PPnnw wwwww P.P.PRP. nnnwn Polon PAP 1P.w.Poles o000o AooAo oonwn wnn.P CNN ppN 0p 8A W HA TAb nT d M TNN 2228.1 AMR/ TAN4ro Amm PO AYbb AP/ OS38 o 0 EP< 8'0,§T; Imm IM 8 O g tDAm 8'829 'OC 98 m T n2 5 ti HU AI n. bd W Islil IRER 41111 EMI IREii E 1E111 Massmm 1111E Hilal - 2,612 ^1n mNMNB mibtimbTT ',RA 2 m Odmric MPS/P. n$w^ ABnn A m S,SR4 ry7 o mPf 2 m arJagBx nN Es..! 823n8 ORA."-8 m PO3 dnNON PAONa A4000 ;g 4 AANf 0ORY.8 mT0NN TT .Sm . *AR WANNW OOWOTAla W A02T2 cC4mmg OmNm E N8EEE xEamm EIEmm MEE MEE xEEE xEEmm arnw8I EAmWm AmA ONN 00Wppo ONooON N0W00 oopWoAd. RS84A gq4RA4 NAdppmp0Onh A- dd oNNpn NpON T0 O•-000 0000N OOoo0 00,0, 00,1-0 000,, 000NO ONNN, OrOOO ,,o0 00,0 W b'•m m{�m vas 4 mm h OeV ggg n gtNO^ Amm b m T V gg I�N wn`ON 7041,00 m ON120 m'b' l'If 4404 �A °aD' 884 n Yo N�'nwlo AoAUIP2 �j Id h c� C � pop)p N V y�11�u m 1. o'n5 ui 1p yah+-� En � rm Op�� ERIE X00 6 Nm �p ry�� ora 8 �y R It)lmE NN REE 1010 biibo A A I�^ISA EA RVE MEE 4EDOIOIOER RA 041010) 00000 ERE" � NN N 2 e N $8414 m O O S m 4 0 N A m 8 e S 0/ N d s 0.2 N mR 4 0 G A N m m N d _ NN 'wtyp O O h OO O�M40 ' Odi Pln l2 Qah 4N nCDOm l2, C N tV Pl h �q Min A CD Ol�PiO d�CCV a 'Han' m' FA t7 'O�N lh NTO Ad I, n NP2i m0 yy m oNn'41� 84""u>tp tp tp tq'414 1�,1q�nn maP`� m�`8m c'$m`�'� g;�$S,� HRH �gl8 me'r/ a1n 3 0 ;F2 'A SSIoA IIA18 2oS8P tp 4t;',TRR D o m Tm T SAA 182Am 24RPA **RA8 PARP4 8ry'Tm $m RE 8 g§ REM OOOOFRMEOnaAE 10ZE< NmG 404 O O^$ O N n wg RP/3R b om 4P88R Nr A w N S$Am.N NOdNm 2,nean m^x8.n d SW'N ammOq N m8r9 Vn HF Em EERIE §HgE oS Sm "88,7, H' NN nE8 EE omN nEE IEEE 9 w e p W FN N[mOmS to Rm AG 42 A N w $Ond ANN A2Gp V 1T,Oaa^OSRV AO V A2 42 G28A4 S38/ -0- rmwCm OWN. T n •t1.. C .N N ggl 2 FXmOOTf hnmmb aw8$N NmmNa�a vu 8dggam �ommoqNd gggl2A nNm4ra oqm ob Bop dP«p$ 8 m BN /8gm a mmN e Owm, swig $RON wON N00m ^8V Pig86 44"8 OyiRRgr8E-414 S0SSm 3A3AG RUSTS l0000 0.% 3 M 22 NCT 4dP1000 AREP tpNPl A.:=/PA O OmNSPA V AGAP8 RA Y O4 Otd00 dt0 RT-48P mbSNd N SP-88 .9.9: 13 T.�A yy : g";'1:8§ §§84 84y0 mTP Y p N 8 4 gl 8 V d f m4/4a0 ya4Od OOW., dd d.f 44 400 f0 .,442.2 OQNN AGGAS 8820 000Npdd •v 6-rt.-1.2g N NV 4 O O 4 4 m m A44/& d4'N N 0mm43 m T T N mO Nm OT OTN 28m00 bTPO A A M N gp 2 22222 22222 2222A AAAAA AAAAA APRPR to Rth,PR R RARRA ARRA* NNNNN AIfRICA,% MMMM vV gsIng sva0gm m 4 88VMAR2 wNWSN P483, 483 N21..).32/mm NOz00 m0ms A PS R NM 47t51-4 A9m0 mw44 M MMMM «IRXM0 mRARM ARARR ARRM 414:4 YdOfr 444VV adada dVddV Ydda< /VCR SII 2E8 08888 88888 8888 8888 0 88888 88888 8888 88 888 88888 88 888 88888 88888 88888 8888 888 m e04 ^O1 1 1 SOO 1 11 12OCpNO51111 1111 1 1 01 81 111AS Erin 14G11 pOnS fo Co N u O I�"' NOmR�! "14-h� Onn8 p;!!! ' N E Wm� !!!!! �ppnmqg !!!!! nigWRNv$W amMmm pOaNfF _ ena a44va tlq UmmUM7 241O aaa4 4 44a�a avas4aa°D4V4h 4444 aaa47Q!2 o ; r nyynmmm RT!!V! 2!N1VoN � MEE AN A ImWWEtD8v222 amtRW 20nm 82e8W AF/An aoaH 0 11o! W!! nryryry ONrlNM ETN 5nMN WA NW oo” LN1414' 28 N2Y6d�ofpdOp Q N N N JN N m� M n 8oM No 2RY 2 Nw$R onM o B� r'ivw<"Ain .'7 t'7t`Xm ac ori , oi Wiwi of lG2ms mo-'F vumi o'$m o4 2L1 »unano mo m - 11:; 8$ mnm gi EEll m sat a east. 88882 M8824 88882 .$1st 88888 sats ass.. assts dill Elsa gig hC`gym1 NOrnsWAsiON2mmrtwV smTw4SJ,tTn7t0NtT7 x�T 21.6"1 1.6 n«8 I�gi OmW2fi 122" 2W42Mm"��' "�m(m79 rQi f� NR� GE WOooJsmm N��nyyrptmAoam Nm00mm v^�D�af m ONaMOi OWW 2IA;�gdruC, DN�2M� 71 151 Niiii Hill 21! am .M000N oNoNnNNsN NN ONC N 0M0MO2 oN ONNN Wm C 0MoM :1!1!!11 NMN N Y�NM N NNMN do.-oM (17mn NNNeo O G O O C m (918"48.4 241888 T E N N M A TRP M nN tGr A m PEo P A N O mry m B R 8 8 2 8 Y N T 7 8 8 A R n 3 81 V m 7028;4'; 8 88 P NmORR OOTM OmMIO CV ! EEEEE ANEmb Mbm EEWRE EMIR ERAEm i =g2 181228 Ino noV2 rZ12E2 21.'2224 8-1"4m4 1.°21G74 4"22 2,-2O2 -.;1711g "212; 2" ,1818 E 'OMR NnN15MAPA Wgpgi "O" Eb PEETSEISE EnEs Rhp "gmm EE8'42 0QQA 9 0 g�n pNOn" 22't" m_AGMOV R n 111"1 NQ IN.t NRmC9T22"2 nR" I:"="2 222"Ns V sbAh, .. m TN NN H88.4;' mSRPMm�G8Nr7G m7VAC ma$ 8mm V28mm8 CNJ U 8 8888mV TT.T NN N N NNNNNNNNNQNNN NNRN RRRNNNNN 9 Q�JJ �CyJ OxQ C..,tr+f h10WO� Ne�ry Om r M" n7Omr 2.2n2 "N22 �mmN "1" 4. 1222 2122W 222N VaPONO 2 2x 7 QN mE8m ToNEoEoogg ° .18v 4n ' RR2A "ERA pna ""6E! 8P,' gEP 9RNNN NNNN N NNNNN NNNRNNNNN NN w C 2;."t•J uJBn$8 N 2" n0 om 2224'2 22 20 2 P om^^Am22221 2"" mRROO2 "222 8SO RnOoW < " 8 8888.8 TAI8P ?sSrM iiTRS 0PSVM OMSR7nn8 VC TPsi SA888 82888 8VT,VW mTWT. 0NNN NNNNN NN4NMRN NMYfN NNNRR NRNRRbRNN 0. RES PAVNm m V T O 8888; 888T mn ON mw:n P0CMo N Q .18288 N O mp m OPN$ 2A r N 88.tA' 888'8 28oW88P2Vg 0Smr "aan 82PST a agm.1 82288 88P88 grg;g; n MNmnE 228E8 nNrANn NNNTm LiWM mSHaan GEGEN 28882 222m0 88838 88888 8885 a H O STA82 8 8 0 0 2 88:548 2 18 888 2 ;2828 mONWN mnNN� m00OO A NE V R 8P2g8 RPTPT 8884 884 D YM v O i A N Y yy JJ ttO{tpppp i o u j O I t V EMI i A�pp O N C ms 8188 pp� O N V $��j�Q]2 ,mJ 0 rnJ r yA_ w y A w Y I o f p F f inN VMJ nN Mil I trif N trn h NMI n W Ta N NNmml tommmm GG11 0 Eig tRD tom i E gasEa sEsE N NNN N S`78a m hr m 8 00078 N m r M N O O NTO Q bm m e o 0 OOm VTVRT RMrpT O m W m m1818818 18 7042 M tnn�7PiPii7 rmJrmJAPN rmir°Q,AJnomi rmJtW7rmJAR oJrmJg'J«RA NAM A8888 28888 777888 88888 888488 8888 8 1E8 74PJn PPNJNA iieATRT SI.SMSri R8'Jnam svasg QnQ2`a 888%2 888P8 8838 8 4224 - Q QaY88 aVeva484V aQ4f4 ;8888 888NC8WmRR 0180018 N�PMrPMM%r r8AMP7 MotA7o Ic8 8888$ 88888 88888 80888 88888 88888 88888 88888 88888 88888 88888 8888 R N ty N m men om p .00 $Rohs 0 QuYM1pN ..os.o p ...so ong ...op o000m S NO^ mr2 miEas VEEE mmtEIS EIEEm p0Esi OgesAr UP A h AWA Q tC N m U ifEe ryL' ` SHR HIRE �� ol AP ca 1§111 011i1 bm w--okl van 5hm um lin 0 oHmm - m E A o a mrAmm am mmm 0)' HEM -in-WU WM.1 MR ro bac lcro� T4TW? ? g? ?TT?? a4oW aovaa vaa?a vaa a°" 4o4!4 Doacm maWWv Vo477 °..N WM bGlg iomo 4 1mAMPvY OW O4 1141 04$ 50 Npip 05 f g AiHra §£ R' m6w221221g22.n vv55 NNNrN RN 3N .ry ARAN" RAAAA h NN owNN N N N R R N N N N O R RRRR 00 0 00 OOOOR OO OyO OOOOOOmA APAPP^ OAP^P ^OOP R .9-RR-RR O^RR RRmRmRSRS R w ORO RPRR N70m2 ACVNO NNm2O VNrN PAMRm 007µ8 LqCpNOPOOmh aenWN Lig-'2S2 NN WCC MEE m$ Ge. . nnPmmiOE VlC aEHE I HALE EEIEEmmsmm MEm mmggE AEBEn End AE rom PWOms rommmm TCOOW E$$p Cho -900 h0 28q8g g°287:8 $i0;10O`-2 l'I6Mm M18g84. N00Nm 84;88N 28'483 38?" RoN28r-='44 Q Nmcpi 0fG. In ORO mm ^ Im npNm N 111mP Rr. EEIEE <bme b.fi ON�gb Abp �Ny EEEE1 EEEYYff 0p(bV N N ip pI ANN N tbVV of b�/1 Yb Y>N!IMF. N�0Ny.NN ��yp mm Ml b♦mb q0h q yy�. pp Nmh Ymi BHN mmbH ,} o 00000 01000510 100000 0ow;N em 0000 0000.. 005M0 m15Cbb7 000 0O0$C 00000 00Nt0 0 0000 ococc �ccoc co.=oo deioco 0000.- ooccM 1.{SmmA m5ocui mlri�o.= o.=mmni oo�N (%E4 '8;2888 w8Wh '.°444,2r-:g N tlNV�.N $3828 3Rmm 7ANACGOONO 000A00Nry OCODNg nOhma 170N7yw0 822'4V 2NA70OD 7 l-NrO 0088 A-TsMN g 872PMS 4-zgA 01 )80 5000 E;E? 1 72 $mmmm �TT.OTTN $$R2RRR.NR "NNNN "NNNNtyNeyNtONNVNlq NNN(4. N2gAg =aI2 3w,2Z2 72g % 008pf00p23 AOT02382418p dON�m g2rp8A00 2gSN10A m00Ainn0080 7RAmmNONppiNNNmQgvn0 4tviA ^ORS:: N70A♦ ta1G2 gpOv "NNNN NNN NNMA A"0N vNNZA N N N N .�yy p �0 p 17 ^^ �yV ccVV N1V m Y pp1. ppff 8P-48 e 1y 01075A7 SODA 2A ;0✓1 NN ID170110fy I�:42178 !100« nNw 8 m Mm 00 MmRr N Ca NOO V iO tOm ,4'6”18 p < m y� O p C 1yO� �mI a �...n O.ONOIi� 1C0mO0A AAm�1,�f NAM <OS AN pAAtpp N 0000DN 0t7p{Ory1�yG O1��1 EOE{0'7. t�V7170'f MM �OO Pim< AW Oq�p ym 1.7 R ANN NN NNH NN NN NNN N AM N t"�11 0 SIMM MMMMS IN..II,t+ON.1701 17{7!71717 EA/517 17 17 A Mv.17 CNCS� �10� Rl 0 • 00NO� 1�,0�Ma ym1I b A N O N 0 1NynIC7NOmi 8280 Ec AC:4P a�00 A Omi00m. �m cin" �wNn §§ :::: ::: ::: w bg82M �m'o�g rH NN RrmW� .n...m RA.M. $ 22.2 I.n.l%1.1`4 AAAI'75 ASRRN NNN "NNNN "NNNN 171752EO 1om:=RO 7251'74 00005 50 0 A®A 00m8amN P Mm 7V N m COmq m tNN0 11,M NNNNN 117AO 15102 111k1 11;15 7RimO ARM 10;7O 1717 8 pp mm yy�.�1pp 17 mm y p 1071 p y� Op pp m 11�� ��AA m N70011A� ImO,tOlp Sg? 1v-z288 mM OID,� snA 110..S Of ICON b V 8Ge 'A1CO.ry 2°a�A< 001m $ fee,” 62,'111410007...CCC���OOOpfff PAM Qeeop 1y Y V♦ 1:40k; 1V y M h0�0 800Oi ONmioO ^ 100`OOOO A N2?07 AMI qq�!! 1�1�1 tf 0.17 N05fb5A O.�t717n N�V mm 8mm tin is roto Til$ m 111 nrn N i���17I nln R; 1anwnq nnnnn nn�n1A- AAAA NFA 8R30 Op7s% gRP2% t005.00m AOhnC. T{'lgPS 022720 NnAN AO 22518? 8N1N7ap8 MOS<, mnN101. v _2 117+11177117751� d g OO �0 N mm A tvgaR sRm nR.G 1VV v 1.1 R v�i PtYi 8i V 0� bAO. .y�!� � �O.�IA 2RffiAR RA v bAN ['.100 O mm m mmiomm m1AO<AO S.. iotS.RR ,RP-.74Z n nfgnn 2.2PP 1'.n"AA v1$f01H.m � 2`"i.D� 1°Sm 1!$11$2$00 ni nt: �1 nw wwnnn Awn AAAA SES 00.00l0 Aon A0001? 0000 nn A r OO.ON ARAB 00000 00000 00n04 IQONooaN7 11$g 11pnN 77MHA 2488 f C O���� 0,. N r "44v' "NNN N N N N r 00O n g 5 012 N N 2;,222 R "NNN N N R R A' ICI VN.HAO)A 17Q1?MA A 00121! 'h1O1Ohlm7 AANP V 1V OO.aM1 rat86lr NOv,AOm0P mm2 .HN2 NO Ol�,�a C A V V. • MMMMM MM MMM AAAAA AAAA% ARRAS AAARR RRARA '«RMRR RAPPIR AXAXR 32288 RRNA 2E8 88888 88888 88888 88888 88$ 88888g 88888 88880 88888 88888 88888 8880 v er rgooE IPH1 MN 18111 111Em 11E11 1-EII1 11118 11m11 IIIIE 1111 co Cc 2 4 3 3 6668 a ° m O WJ•:.r� 44144 � �,N 44 4 !MNV MM�n2pENO ryW5VS �On 0 WN2 28A " mm15Sm 252OMP mmmPm Nmh INRa FAM b�W�N SOWiS 20a. Egr ` ,2Waap-angb7 18 2324 84bEOs$ Ng1MINddd otwe � 44444 14 44444 44414 44444 484444744 44444 44441 44444 41144 44444 444 (WQ 2 pay d.N. � � p�p.p� Q� p� O�< P" MER q��rS(D v} W f -V2 �8Egla ph�Nng*.4. �VIM.y dtDE1 tEEf(1V mgtEl. �$�Oj M�pON 2081 O�YYYr NAm np ctlppp��yao� 4111 AeI (7 O N1oyV tWtVV�Mayy�tfy7y anfyVgIy�agy ryIVmfy DHfyy Amfyy�MfyV tNtVV�aNyy (m(VV t{{VOy rymfy flf V7V trtVV �0fyy�a1y�saV�1[[sV2 Ofyy OfWW s R2.An WN(382 v2i Ot7 t�NN m v.00 OOfO tD 10 Lin N INOryRRR RCM RRRRR m10RRR mI0a0NN aD ap lrO mlO (O�VAik N gg Ip TU, Nry(O arD ry N N N ry N N N N N N,ry ry N N R4RR ry ry ry ry ry ry ry ry ry ry ry�°ry ti ry N ry ry N N ry r ry ry ry ry N ry N N R ^COO O ^0 0 0 0 0 0 P R 0 0 0 0 P 0 O O R 0 0 O O O R O O O O O n O A O^A 0 0 0 8 0 R O 10`'10`'O O R R 0 0 O A A O ryp W Wr882:4 4 W 24R 82y 84 2pp 20P2pp pp n 288 24 n22 Cjn 42824 y82112228 2y 842 22824 4 a Ary l Av4 "nmp"g4 " 2N71VAA ''2dGlg 20 ( g 2P" W "g0 NN Wmmpmm EiiiioEE S2wSS ELM iiipiii Cm4 24fDfRN RPPSA S.Af=N< O2222 2PI'OW2 ggP26 SCP&TP O2V-MT N400aD 41°,7422 a RW-;N Om2< 14 PPM; •w' $ a AyP4211! gmh,nP.0,,1,4 MIE; p1DRe$«, ry EW N HEIR RataYERR EMIR WNW OIWW 2WNNW HERE WEW REM REt InD,N OCM424MMMmOm0 82000 y0dm1pN2 hOWaA Mm01* gWVW mbry2n� O --Crr GOrcIN enOe4 4MrN0.0 00 A A W W Cm2) WEVN 4P8g2 0N7-V4 W822 nhzg2Sa32n80 V NMNNPE7-g220O NA mO 8muP e Pgr4 2W2° 10 A 828W2 84284 88488 ef-agg ari2o ANAI' a^gN2 W2Q 5,;appx82p2 ssig N NNNNN HSNNS N4444 44CDN N 747CpCCh N EM mn NON am r.2^.O8 Wr nranMf g117-88 m r88 E2AlNtNN 2,7i72A t9VyN� d mgmry 3 1 7 2MM MY V2P M2a2-7NW od a2WA mNNo g0.722OmNMgSSmN2 2.,.%22tv: 08 NeM S8 NNNmm ISH4NN0,1-4-, V1 VtV MMNNN NNNM , N NNNNN NNNNMMeIMf555h 9 mpv OO mm11pp a c am of Ott 0 0 Cr �02m2 aNDNaDN4 gn.12vf= N201a7m Y ImNOFg4:A W42Sm XOumiyn�n OnIS pS� 0444 lapin 4851511('44y b8 Vmr W n��UWOi t;r2R2 p8 !=48HI480 g'�jj I4102T N-al";hjl22DtV IOp�OtlNO r^n84 CmCm memw"�mNm aampp7mm05i0f OAi 6-0880 V4P84 +waha A a'l O4(OOf NNAND, a M NaS7MSR 1"�i FAX8 RAM R17f71717 MMMMt� t7RaRs 17555 244dd 42204 40004 44444 0004 9 NP1 ttVV ��00 OO a1+�I {{pp tt�7 O a+� ''ES MN284W V8V8[4V8 ralm0rm pn8MM 488E8 44248 �nONN 12 agg,aD t0�OI741rp aah84104 284O12O Nm aE 42 9 • A22PI2 84 28832 4242" 128R4mV- WA �jem{p,QO�f��j" a�P�I�MnON 8PW8m 27:mmW N4P82 8842 9 58888 0188 82AAR MMMM$ 58044 244"34 44 44 44442 "4'44`4° 7 1%I i7 Mf%>CI 1S7 88888 28228 en7 t�MMM MMt7 c'I P� O W C 88R88 8 82283 8842R 28848 28242 42044 8888% N8 7 48224 Nm A84 r<Npmm7 A:2888 m88'8 :=4144fy 44 Wnrw22N"" "V"2 "g" 41°12 : 2CWiN1 nNri OA2" 8222 ARM "02 COO W0NNNM L a '3r ' 1I- �mPIt6SR 28giS it§4l4S v d.4 RW 4mgWim44 82 42M2o 2112'418 4^218 222,24 4d4E E m$.gr 82R88 V�inW mNNpp42214 OAe<N 2222R 2mg20 neav� mOmWO Liam pmmD pmp22 22.. .8.22 4342m 288mm 28888 22222 222 W 2820 AW00 2E4 88488 .12141228 804 82824 8.t888 14DOW0g Sig NO 22881 011a'man.a. SORA SAGA "1" '."m RP" mm"2 ,IAz ib' 11" "1" "2" og" 2$7' il"11mmmm 82282 2m2m2mm$twm2m 22222 mm.. 22222 22.2mmmm .4 42a0m0 S2M122 rd 2cW1 170400 2NOI00 88488 12488f21yy`01718�p2 84488 14 lo1pp a8D O8D <424VL 8O488 .4.y88a8 Oi OIWmm. Wmapfem r'!rr Oi OI®NN NNIOYNN NNNNN 82288 Mf7 Ml7M 1717 c1178 472444 Q4NN1M0 1D3N1[Mf E 2 CO3 80282 R W P48 48m88 NSm2N 84.'248 24488 2,TaN A ses4n gM,2p ^410 0p 444814 2222r NO N VC NNNNNNNNNMOF7MO888pQ7Xgnpi52400p88ONSOWfavumn nn,4O gap, 88888 88888 88888 88888 88888 *.22381:01 Sg4012N PM14 mOCi Y28g8m 2.'-14.05 48282 1mD01�0 $ 8b-,ss +a mmao§rn mm1I �Ig'Ndaa81n81 $saaeS mwm�$ 4SR . ` 0000 ;22222. 11o2'LAml.B$ SNS"VS 0000 Co Nm 8 F 5 cC A O ii N$NdE 2vNEm Al V O d NgNyy gmy1� 00 tRg•282 A1�t•1F,NNr/� NNNN 8, ml� T TOY l7 .vN- ro0 p ssa 8328 v4SSS va«v YY Y avvvw SSSS* SSSSS 'a SSS vv.vv vv< YvvvY SSSS J • m4Y 4T 44444 T44IC 44/44 2OdO0 44444 mOOOO 44444 44dmm O m2v 4484 r • • • • r r • • • • r • r • • r r • r r r • r • r r r • r • • r • r • • • • r r r • r r • • • • r a ic" TO•D Om fMO In p $ Ptg p O1m NmAMill Og mWha22a gg8rn$ g1nhv 2i'0Qp nigN4tA nW^ e.p1mgqsi .241 Wps N pN lm NNSSS NNNmS NNNNN R4R4NNNNRry ryryryRS NryNNN NNNNN ARIVAR NN OMMI N ry ry ry ry ✓ 88888 GOOOO 88888 COCOC O OCC O 88888 88288 188888 O^8 O C 88888 8^C^C 8888 p m mm�1pp N�.1 CI pp p ��yy O �Ny r/� OW2 Ol'R1•"4",:12'48 0(7822 RSSRN ARSA A WON AmnttaR2 $I�O!00 E2Hfe OMr2m �hC1S t7 h1•IN, e= pGGpII CMpI tNy CyNI �pD. b �y a yI {yD 1yDI RAH p "'SOoI OI pW000 0000 FF NNNNtV Mg% 'ii2V,lfO <f<OO h%12 2NTNt00 t H3§ RfC tmOnO 888,1 N b h W W W 2 2 2 2 8 2 W 2 2 N W 2 2 2 2 W W W %% W W W W W 2%2 2 2 W W ss E mmmm 22222 22m2m m222m 22%mm 22222 %2%22 22%mm 2mm mm2m2 22 se ss NN 08887:120 8222% N�8N 2O NN�+Om�.I O Nn 4<2 N 22784 28422 W ryoNN2 rvry Eo O 2vW mo 22.428 2.4 A T2Nh 88 g " CN 'n ' Ym2 N228c vans? OvmNN Iv 2O 8Npm2 83 WW2mN$ $$$ 68888 i'" h W22A22 2h aaaaa0m2maxFAmN �l AIMAEAEa ax IAAaAEWA Aall; W^" 0M7; nm! AAC<':!." !MF;!':; 01 tCi O C G KNmi 62222 ntpovmvnl TrW.am.'- no"WS pum1R" MAR nmrvl24 RRSSn !!" ",.: R1S'i$�'So' $n2<m N12)o' n 'ai ma7 - m trill 'vi o. ac vi nai ai ai rtri c oil Wai of of aIN AR g ES $42S* OOA SS *WRN Yn CDN NAR SR1526" RS Ont 82222 AN C1mn "328 NAA V Q rag2 pp {y 2 RARE "261 n N v< Err 1E yyd'nm env2g 2 "RAE 1".IAn 1 5 "°��` E E5yRRE 7 RENS "CI;�1� S3 M'74" "RR �7n me41R gI of Ne oiR. Y4T?T 44YY? v /R4 4445"v 1444Y /4444 $Y4Y 0 N O ^ m p�Q$ 0 0.m 2hT$� N2VONSU:Or " OT" S7m TCOCm mON�NNI"2O YYN4O<"N NOg<NPN7f 08I %$ a8OGnm % O1O� npp18222 22TVIV U 444444v422pmNNNN 222233212 0222 n822 222Y8 8822 32282 N1010ti N 3 =Y8 2 822 2V084 mO2Nm Av N2R NvO Oa 8NNN8 NOO2T OsnNA s20s p 220 T$ 8428 • N4426 C hA "882 LINN '"V' w O2322 2 n2WN 252::T8 a2g828 R882 GBIE2 �nnmy 2222g 2L%8,882222 2g2e$ m"mg 82282 $$$2 O C 8E2 W S2pP,Rm.g1Op 2t7 4124 SN.nCIp$O NN 781°6 22NC0 "W gS -7263p 6A ""-R ONO2n O m$O 1" iii92 Nmm Yi2$5 11%15 IE N N0N ge2 m�yO �1pp pp�� mm mm mm pp m1�y CCS�II tV t1pp m mm p.0 pp �1yy aa a P"O O S S O"I M O m M S q n O)O V S I G'g 2 S$n h l� 1�NON M n MS. �(ry(�O� N�T n n E N O N N R 12 2 CI" O n 0�-.- � � CI�II N�m)N 1� W Cmtd a mY 2 O(�(O m'n A n22 a aim aaala saaaa ama 'AMA Aiiii S+3moploRI IR HERR ERRAi RIM &ggg N E2 "V W O vm0>N N W ONS 2 n 22R Y'tf:AnG C"CCIN1.72 2a00r-Sn$$ NDN rv2 hh2 I mS00 II111m mill 11111 MEI 1Eli "m�� %mem ���� 22222 222�� SSI Si %% Hill mm2 2%222 �mmmm m�22m m2%22 2222% 22222 EIRE ICC 84224 HW OmNWNI ::2222 2NNNON242 2�22N- 24&21 22828 -Hn22 ""NNN AA TM g V 2%%2m 2 222 2mmm2 awn%% mmVNh �2mmm 22%28 22222 22222 28282 Naas TACS ABY R Ai 128282 n2A AO :=T482 N 74 ty2T2 T 88224 2%2NN W — 2 22382 882882 2222$ 22222 2%886 22228 8828% 82282 y,&m22 22282 22%22 2222 O %o 22i 1"nq1p m10+'�OOi W.-my y {y'42 Om" V♦ ♦a4W m Opp mm "%AO" mzgg!l 11l!ffN r �N CIO% O OCI N r Y O Of 1nnmN 2 MONY W 00 W TSA hA hn2 222 02 a $CI m C<Nm CI 2 N t7 lG oyp CGp rt70 Cp 8 N�NI n0 " Han CO)A1p lCVI 1MD Wb tIV� tG� O 0000 0000 ��QNIV NECf R YOQ�1ff ltmit022E prn:Fi2 2Wa n"O OOh2 NHNNH FAi! SSSN 2 N O OI E � 1 0 ti $ro 72Eug .OI a E.'44.4 ammvv44 a v m T 0 0m O O d J N N NNNI NNN N O 000,0'0 0000 .- c., << mm �pp Q C NT bmte.pN RA.Tr d W m mA m m m w mmmm §§§§ ty0 V S gt MM oT �iz y^y 4 aNamF tv O.NN y'O M N lyp h N N �g x g a l T 0-0 ..m.0 ..-08 EIV O.pOH� 70�0 F. Z ,.RNR g ssoss w -r, .,is OMPA Ej...2� 1 N0000 v1 OMPA rvga i N�`e30'0. • n r-'4 ign op a0 0 Wma ClpNsQ Dvopm UUW p i8 _8 QO3Va mh•S • -p V � MU9-� mm m m N I ' _ cD m u (1J(\ N _-m m W OONN 4t�i�0. ' �tN90NN h 'Fig T 1' ^r_ g ..,-4 'm� EE3.3e mm� o V o.n aaa 'co ' q 9 t �° r w o - V U O t � C 'I1 p p mp� tl z .$' I 1_ T y .717R412 W�Mm q V OW IO tG O N L 3 1,3aM 2SES $ Z v > .. . �� fq 0, It -Cr `m Clt jam ov"i,��'eNy ..ln'8u 4gPf 'EF, .. 20g, - f v 4,iiN ritiG.0 oto-450i0 'y E 8§§§§ Rolm'' a a1 •O o Ug . o aaaaa pd 4 aU�F c 9 ' m _ m • m C d 3 o f -62 E .- LL > o a m O D Nyo mgrgl�n`�`�i e:ymn u; 8 ,t F m IffiXi I0°i1W N a v mmmm m j a❑' OG`' ro 3 Q a Q - t°,A wig:: ; sv.g 3 E§§§m0Z= t 78 �3rtts `tttt ogoAt„g w ma O o I A f m co p 'nO N tJIfo co =wN �OmOTO W '4. CIN to EEE CS80§g m W m W mT015101 O101WW qLLq^000 ty�N y S Wia Yi N C m LL 3 • pp1 mm pp a' U it .$ N rkg .5mm 'gt'fm I �VVT2 F":”.".1. $Ul O 8/ '- O -4 10 Id cs; E Hc Z\Z—\OI 23°.►60 gyro da f 23000 Noarthwest Incorporated O 23000 Northwest Lake Dr. (� Houston,TX 77095 (281)213-6300 Fax:(281)213-6301 May 15, 2013 State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: DRILLSITE: 2 # 02-12D Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, /4/4/:Y1 ,/ Rob Shoup 1 Vice President, Special Projects RS:kr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data __ RECELVED MAY-2-0--21113- ------- Incorporated 2300 Hort AOGCC 23000 Northwest Lake Dr. Houston,TX 77095 (281)213-6300 Fax:(281)213-6301 May 15, 2013 State of Alaska - AOGCC Attn: Christine Shartzer 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: DRILLSITE: 2 # 02-12D Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, i ,YIA/1/f Rob Shoup Vice President, Special Projects RS:kr Serving the Worldwide Energy Industry with Precision Survey Instrumentation SURVEY REPORT BP Exploration DRILLSITE: 2 # 02-12D PARKER 273 Prudhoe Bay, AK AK0113GCM102 12 Jan 2013 $1 O C 00 IO N CO U •0 O b N o o x CD trio -0 0 0 ;-: a CO U o w o a b CD MI Fx o U o 0 o 12 U U o o o 0 00 �. C F- CEJ U 1-4CO ,G 'V ....i co -0 o$°' r� U Cl.) ° 0 o w P:1 1-4 tj 0 ai - N xCOUN UU Q N W N W vl U co o co ci) ;_j . = Q 0 0N0 0 0 3 . M ¢ > - xQ ,, zz a> 0 N M Q Iii ox O ct 0 X Qa s3 ... c t j -o >, a a) 0 cat tIO C) Q U .� N O 00, Q cC 'ct CQ 0 — 1 O W O a Q ? Q x > o ,0 0 a xaawN z Cl) 0QUz a)M .y H N bo a) .0 o N oN T.1 N y rn O N ^, o . O cd CD .Z y ii 'V cd�-' 3 N N co bAQ c� �+ C.U O o 06' tEi U g Z 0 j U O O E O sa_ 4 � � oN p Ce 0 U c c '• 0 W 3 3 3 3 3 W W W W W W W W W W O N N ,. --, ,-, 00 N 00 00 M O O\ t N v) W C/D O ,--, M N ,-, O N v) 7r 00 'r N O N N Q 4.1 O O O O O O O O O O O ,-,* N M M 4 <• H ZZ O — N Z Z Z Z Z Cl) v) v] CA on Cl) cn v) r� on O (412 O Q 00 00 ,--� O1 VD v) O\ M ,- 00 .--i V1 .N-' 00 rr�� O O N M -- N \O VO N On O N N ,..L., O O O O O O O O O O O O .- N M M Z H O On VD 00 M N N '- N N 00 ON u) CD D CD o ,, - vi ri vD --, v6 l� vi ri vo 0 F-, O ^ N N 00 'r} ,T 7r M N N N M M on on on on Q O ,-" 'V N M N 00 00 O1 N OA N 00 O\ N ,› U O O O O O O O OO O O -- N M t V) N - N� � '7 Cr--- U H ♦T (.77 G1/46 Cl) W R ,..., U Q x o Q o00 00000 oornrnoo 00N o U O M f-' O O O 6 0 0 0 0 O O On On ON U O\ CO �--� �' O _ N 0 0 0 0 0 0 0 0 0 0 O) OT O` U O\ In W N ,›-. V) V) tin � vl v') vl Vl v) V) v v V v V ' W ^ 4-� W N M kr, VD N 00 On O N M V U O� I-1 s.. Q > W 0 N (Zi t:4 Qi) a. w N x Rt o >. HO H czt ,.,/ Q N VD O\ N — M 00 N O N kr) v) V) ,-� W f:4 by O �+ Q a M O -- N N ,--, N (..r.:‘:)1 o W C7 W � o O Z 0 Ooo 00000 00000 00 �, 3 Q W > 0 H ( N x Cl) 5w Q W C7 � O oV0 124 P4 Z � H N 1 W O H O H Q Q) N O1 O1 On — CO N r- N •-, VD VD , , Cj t� M bb O a y' O U VO M 00 v) O 00 M M O) VD VO N VD O ^ F+W-+ -4 - O M v) 7 N [O CO N N On [D N O M l� I-1 O VO �O O �O vl O� O N •cr M A. N O C7 ,_ r. -.. -.. r. N Qcdo 0 V) V) oO Q — w z O Cr) 'U U bb O Z `" O on CO � c�*) VD 00 NOO M7 v � � z¢ N M Z b o OFx, 000 00000 00000 00 W U 0 aOWo Q O C) (21 I p4 U O O gi, a WW 0 Q CLI 0 -o A x o P4Cn v 600 00000 00000 00 A, �, o >-, Q 00 000 00000 00000 00 �Ca" o E'" U 0 C7W N 000 00000 00000 00 N Z ¢ W U v) vn 'n 'n 'n 'n v) 'n � W ,-- W ,-. N M vl 'D N 00 ON O ,--. N M ti' ,. 1 Q. N O p Q < ¢ f(s�/] W '-] '-) i W W W W WWW W W W W W W W W W W W W W W W N — O ,--. '.O M --, O N Ch N N Ch N 7r 00 Oh VO 00 V VO M WC/) r` N VO 01 N VO O\ N N M M M N vl t` M N N M vl Q w 4 vi vi v-; .6 .D .D N N N N N N N .6 N U , M v-; N O O N N Q p4 uo oocn oo DOGO00U0 00 GOGO00GO GO GO GOCnGO CIO V] V) c/0 O 8 O N O\ Q\ N 4 N 0' U N N CA O 4 N M O 7 0\ vl t-�-1 N un VO t` 0\ O ,-, ,--. M VD N O M un 0' 00 M M 0' O C` O µ-1 U 4 4 4 4 4 vl -v V3 V5 r ^ to"; 00 N N N M rnM Z CD � r- 0l O O M vl N N VD ^ M 01 N 0' 0' N 0\ N vl t` W �:., ,--r- O O CP; 00 l- \D l0 \O 1--.- 00 01 O .O — M N N — N N N Z F.4 z M M M N N N N N N N N N M M vi vn vn 'n vn vl vn l C/) N b Q M 0l en '.D O M 'O 00 O N 4 vl 00 ct '.O N VD N 00 r. U >, U O .6 .6 t` 00 00 00 00 01 (5\ O; 01 O M O 4 00 N 00 M • a) -+ ^ N N N M M V > N U H I-, (_, Q Cip ,44 C U ) Q N N t` t` N N N t` t` t` N VD \D \O vl N 0\ cr O 'D •-4 O oo U L d\ Ch 0 0\ O Ol 01 0\ 0' Q\ 01 01 0 00 VD V N 0\ V CA N N 01 O O� O Ol Q Q 01 Q\ Q\ d O O O Moo N r �•--, V1 H p" Tr V Tr Tt Tr Tr Tr V V Cf Tr Tr V Tr Tr 0' N "1- N 0' N V ,,/ w 4-i vl \O N 00 0\ O ,--' N M Ct kr, \O N 00 0� 01 O O O O ,-4 ,-4 0 O\ �+ ^ N N N N N N N N N N M M M M M M M N ^ > —1 N N al 0 czt W W I--, - C- N VD vl M M N O vl N OO N r-' O 00 M N O ,-4 VO ,--- Oh O 70 V-1 W-, ,O OO ,--- OOO ,-, O ,--- OO 000' — ,n vl N VD N M OW w 0 0 0 0 0 0 0 0 0 0 0 0 0 6 N 00 vi vi vi vi .O vi 0 O J b C) N x Cl)Q C7W (..D Q H c/) ° x _ 0 H ' N -O oo voli M oc on O N O e N � Ct veli � O rn 0000 ON cl CO dA 1000 � N - NO' - o0O ,-- ovl enN '0 ` 00 civ 71: cc; z Q w .0 N O O ,-4 O Oh N VD vl VD 0' \O 0' 00 7 7r u> un v1 un . a N 0 0 W Ur� �-.� VD Nr- O M ,--, N N N O 0h -1- 00 O N 7r M N Ol VO Q Cr) U GA en en -- N N N --- ,--, - - ^ N O O ^ 4 00 O M 00 QV O O O O O O O O O O O O O V \O N o0 O - N t-- ,--. < NMZ ,.a) HOS Q Q ¢ O a., 15 w a x O O O O O O O O O O O O O O O O O O O O O O 0., a E H 000 00000 00000 00000 0000 r,, O Z y 600 00000 00000 006 v o 6 v, vi 6 J W Qj kin v1 v'l tin un kr) un un un un vl vl un vl vl O N v'l N O Nun F-. Q 4� vl VD l- 00 O\ O N M �t vl '.O N 00 0\ O O O O --. W ^ ,-4 N N N N N N N N N N M M M M M M M a1I-- .-ati W WWWWW WWWWW WWWWW WWWWW CT N 00 VD M V- N v1 V N 00 00 M VDO N N ,--, k.O WV) O r O N O N 0\ O -rO 00 00 O M [- M ,--. o N tnC Q W M VO o 4 CT 7 aN c:,\ v6vi N O [� V N O 00 vD 4 N E„y N N M M M 7r �t Vl vO \O N 00 ON U O N (slM st v) NC:) � /:4 & ccrctulcr 0uocncc cipuocnc4C cncnc/) 0CD O 8 O) O vO U ,--. O Vl -+ 0\ M V) O\ 00 'O M N o0 00 M M Vl N o0 V) V' s.O � V) M M inCNC \C00 - OC 4 Or M [� O '[t oo N 'O 'O — \O N N M U Vl N o0 vl V V vl kn �O O .01.-- (--- 0000 0\ U O O — ,--, N M M W H `/ Vl 00 [- - M V) 01 M O N [- 00 O 't o0 Cil O\ ,-, 00 vl —; O O) N vi M N D1 00 N N v6 Le; kr V 4 V M M V1 Vlv-) -1-1-1- .1-71-1- mm M M M M M M M M M M Q cn N O 01 N M N NN - CC\ M O O M o0 Vl V) 00 M O > U O O Vl ,-. N 00 4 .--; c3; %64 M N O O� O; C 3\ O ,--; N _ � Len V1 .0l0 N N 00 O\ 01 O N M V Vl Vl VO [- 00 O N > i\ U F-; 4� � _ c.) U = Q , O C V - „ .40„ ,.. , oo M M N O) .O M U � , - , hO0, .. ..„.„0M .OO, N NO0O vO v 06 N .O O d00 vi 06 - vi 00 ,-- 4 'C 0; cNi �, co N rnN , 'C0) , mo „ .0 . ..., „ rn - v; OF/ W - - ' NNNNMMM , VVV ) MMMM MMMM MMM MMM L N N m O H f , , N - 00 ,.. , N N vl 01 O N .. 01 , .. „ 00 M 'rt 0) e-.10, 0, O t 'C N M V 0. [N N V) 'O 'O N 00 ,4D h p4 bb C) 4 'O \O N 4 f M M N M N N N ^ N N N N ,--+ N 0 W W o �. W Nx Qv) CD wc7 H � a ° x - 0 H M N O N N M O d' ,-- O 0\ N --• - 00 [- N VO VO N r- • C4 M t--- 00 N OT o N •7 M kn N N OT vl M v1 N 00 00 O --. M 4-4 00 l l vi 4 4 4 4 V) v-; \O N N N N N 00 00 00 Z Q W ,-ti N tri tri- M N N N N N N N N N N N N N N N N N N O N Q Q' ^ U W kr) t 01 N �t 00 N 00 OT N M M ) 0TN 7 O '0 M M U' U UQ ,-- M ,,O N N N Vl d- O 00 71- ,- t---- = ,71- ,-. [--- ,--. = y Q N M 0 4 M N M 4 V) 'O [� 00 0' O: O - ^ N N M '�t 4 V) Vl rc- -.., Z -0 .--i N N N N N N N N N N .• W (� O Q0 • Q . Q ° a� N W W -fl p x © 000Oo 00000 O0000 00000 (1, a E H O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o o o X O N vi oviovio vioviOvi ovio Vio ViCviovi yc Q N O N Vl N O N V) [- O N N O N Vl [- O N V) [� W Cd /� Q W 4-- N N N N MM M M V 7: V) V) vl Vl VO VO 'O /a/� e1 O W ^ M M M M M M M M M M M M M M M M M M M M M W I- -• -1 - F•, CI) WWWWW WWWWW WWWWW WWWWW WW N N O) O N hs4DOMVD O M 7 O\ O\ N N 00 O) 7 071- WU] V1 — O) O) U O M M M O\ h v) 7 7 )O O V O) v) M N — W — O M [� )D )O V7 71: 71: M M M M M M 7 7 7 N v3 r- M C'N N N N N N N N N N OM M M M M M M Z +_. O Z V N 1-4 tz4 CnCIDC/) CV) C4C4C4C.00A L7C4C4C4C/1 C.4C4C4CIDL7 CAC/1 ,...." (Th O O) .--. U N ,--, )O )O M M 7 M )O \O N N 7 O) 7 V'i vl O rt,�� --+ N M N N M )O )D N O\ N N M — O NV) -' 00 [� M O W N Q M r~ M )O 7 N O D, N 7 M N N �--� ' N V v) N M M Q, O — N N M 7 v1 )O N M O) O - N M . . . . . - N N N N N N N N N N N M M MM H`. M , vl M N N O O O O� O� 000 O O / W�/ M M N N N N N N N N N N N N N •--, N N N NN z W M M M M M M M M M ^ M M M M M M M M M M mm up • L.,.-,N O\ O 7 ON )O v') )O 0 O Cr, — O 00 00 O t O OO N l U O -. M 7 vl N O) .-4 7 ‘.O O1 N 7 o0 .--� v) 00 N - )D O v) N N N N N N N N N m M M mmmMM M M M 7 7 7 7 7 7 7 (..) E ! (+-i • 7 Q _ Cl) c = U < x 7 O M )D M O M N 7 O )O 7 0) M N N 0 7 N WO O U vl O\ N M 7 7 M O )D N h O) M) 7 7 M O )D O M 7 7 )OO) - M v) NO) ON MvONM 0) OO - .--' - - v) y N l/) )O M O M vl 1--- CIN ,— '7/- %1D O) )O M O N M -- M vN D1 •--. 4/ W4-I )O )ONNN NNMMM MO) O) O) O) O1OOOO O — U M M M M M M M M M M M M M M M Md-71-1-1- 7 ch 3...• Q j A 1-1 Cl .— Cl ct O F,,. W 0-4 CC:: M .--. )O O 7 7 N 7 •� M O M )O N v') N •--� )O M 7 S.D "d W W OQ O N M 7 N )O N 7 M — O) N N C` )D •--. — M M M N • W � ,-. NN ,-, N •--. N N — - - —. NN N N N N N •--• N o , o N Q Cl) WC7 < CA x a0 H O VDU a\ — M O M \O — 7 01 M M (71 N )O N M1/40 U P4 CD:1 t)i) O O N co U O M M v') )O O) O) — 'Cr )O O 7 v) N M N z Q W N N N N N N O O O O 666 ---- m OO M M M M M M M NM MM NC) QF--� _U W . , ..0 ,1- 00 — N O [N v) 1,00,-, )O N 7 M N v) O) U tb — N M )O N N M O) — O 7 00 v1 N o0 M M 7 — 7 O Cl )O )O N N M M O1 O) O O - -. N M M 7 7 v) )D )O N z '10 N N N N N N N N M M M M M M M M M M M M M M O (24 1-11.4 W o Fes. O a4 op V W • G4 00000 0 0 0 0 0 00000 00000 00 P-1 a E o 0 0 0 0 0 co0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O �— a> oviorio ,no ,no ,n ownov) o knoviotn ov-) W 0 < p_, N O N v) N O N v) N O N v) N O N v) N _O N v) N O N Z 4-a N N N N M M M 00 O) O) O) O) O O O O — — NN aM U OCt ,0 W M M M M M M M M M M MM ,/-1- 71- 7 7 7 7 7 "1-71- r r l W W W W WWW W W WWW W W WWW W W W W W OT Q\ -. O O N (- VD VO N c. (- VD (- \D \O O r M W O O U O\ oo N \O v., V 'ch v) v) VD r 00 O\ -c CV M kin Q W O) O O �-+ N M tt vi VO (� oo U O_ ,. N M4 tri (- 00 O� O_ M M V cY Nrn cr kin vD V 'Ch cr d' N 00 C vl v) vl v) vl v)cv on 7r un vz, N 00 CA v) \O H zz .- N Q GOGOGO GOGOGOGOVD VDU0GOVDV) GOGOV) V) VO U0C'DGOrl) M VO N C` N [- N cr.N M Q, N O co DD N O 0 i--, M VD O\ N V t- O\ N vl OA N VO a, M h` N to Cr, cr 00 en 00 x U N N N M M M M 4 V 4 v) Vl v) 00 00 ..,:h to vO N oo O, O -- N M 7 v/ VO (- 00 O, O N M ch v) M M M M M M rh V' ,r V' cr cr cr cr V v") v) v) v) v) v) H -- N N N N M M M M cr ct cr ch cr ct to v) v) ken kin v) z a/ _ to M M M M M M M M M M M M M M M M en M en M M M N Q Nb Q o0 00 O) O1 00 00 r- r- 00 0o O N cr \O 0o O N v) (- O M > U O +--� O v) O vi O vD O v) O vl O'. N N N N M 00 a) --� N cr vl (- 00 O M 'ct VD (- O` O N M VD "O 00 a\ .--- N • 0-. U [� v) v) vl V) to v) VD VD VD VD VD r` N N N N r` N 00 CO • 0 _ Cl) d U Q x N V O CD ,r 00 O o0 O M N O M \O c.,1 \C) \O t/l to - • DD U H N O O O O O O\ O\ C vl H P' Q) M to r` O, r. M to N O1 M to r` O) r. MV/ N O` O N cr 1 W 4. -- --� -- N N N N N en M M M M cr V cr '7 v1 Vl vl 1 P4 yam., H > I- N Q N cd O 01 a W 00 OD 00 0o N M6 O\ 00 N cr N M N O (- 00 Vl (- '--- W �"-I W N v) N O N M U M1-- N (- N N O) VO NI' O M vl t O WN CD O O O O O O O O . . O O O O O O - O O O - o r� 0 ' .b O W c� N � 1i H � a ° 1.--I1 0 H N '.O V OD N VO O ^ O, O1 M N N N v) 00 N v) N OD VO M UF+-1 ry� M N M N N M M --, M N N c. ^ O .' N -.+ MM M M M en M en M M M en M M M M M M en M M M Z Ca W� � -d N 8 N CA 3 O Z. " U W O -1h O) cr CD N VD O V \0 N s.o N N O v) v) O v N co M M on U bb O\ c) O) (- VO N N O U M O N M M VD cf M VD N v) U 4 co N ~ Z "d M M M M M en M M M M M M M M M M M M M M M M H 0 f=4 ora a) Q • a4 p Pix 000 00000 00000 00000 0000 P, P. H 000 00000 00000 00000 0000 O Z P-i Q�j N O N V/ N O N N O N N O N N O N N W C4 Rj Q W 4-+ N N M M M M v 'Cr "Zr Vl v) ul v) \O 'D ‘.D VD N N N r- cct P� o' er W Q ctvv vvvvcr crv � crv vvvvv chvvv C4 �l -° i W W WWW W W W W W W 141.144.1r W W W W W W v) N N O) N v) Cr, oo .-, oo IN- d' VD N v') kr) 00 aCl) N a\ M v) r-- O N v) t-- O cr N ---, )0 O 00 N VD O Q W N 4 v"> v0 r U O —, N 4 v') or; a) N M \O 00 VD � VD ON N N N N N N N N 00 0 N 00 00 p N N f:: 4°: O• O M O O N co �O in �-. Q\ O �) a\ co 1/40 O M rn v) ,--. N r• co N N oo a, a\ O N M )/) N O .1- O) x ,---, d O '-. NN en 44 v3N 00 cri FNM v N00 N co Cr, O '- N M V) l0 N 00 O) .--i N M d' N 00 v) v) I ) 10 )D 1/40 )D 1/40 \0 VD )O )0 )0 N N N N N N N N H v) V') )0 .0 '.0 )D )0 VD N N N N 00 00 00 CO 0\ 0) a) 01 O WN N (Ni N N N N N N N (Ni (Ni N N (Ni N N N N N M f-+ V-4 to 0 M M M M M M M M M M M M M M M M M M M M M d < VD N N •-• kr) C) Cr, 'Tr o '.Dv, N oCr, oot� N t� t� t� 000 C) O M U 4 U v) O )O N t� M O) tr) O )O N oo 4 O )D N o) 7V') N 00 O N M V) )0 00 Cr, M \0 N a1 ,-r N Vl U E- co 0000000) 0) o) o) a, o) o) o0000 0 ,-, - - .-• � Q _ Cl) cd Q x O 00 O) N O V O 00 N N )0 O — — O) — 00 N o0 v) N U v) — t- N )D o) M )0 a) r. V '.0 0o a\ — O CC 0 H a\ 00 00 0o N N N )O )O v') 4 4 c'i N N O Orn 00 0o N '� C. 0 )0 00 O N ..1- )D 00 O N )D 00 O N )0 00 O) M v) .-• Vi E-4/ W 4r v) v) '.0 )0 '.0 )D )0 N N N N N 00 00 00 00 00 00 a) O) Cr, 4--7 N C1 p aSs., E—, xa \ C) O v) O —' O r 0 V) N )0 e--- ON et M O v) '71- 1-• to 00 v) V N N N oo v) O )0 00 )D 1/40 Cr, N M )D N O00W 7 w 0O O O O -- O O O O N O O O O O O O -; O -' O O O OWO > Q N DO W LD d F~ , 0 H O 00 N Vl M O 00 Q1 00 )D Ch l� O v1 v) )/') N V) N �--, U; r:4 M N R kr) )0 00 .--, M d' ,--. N N M v) )D O) Cr, �--. 4 r+^ I-+W-I M M M M M M M M V 4 4 4 4 4 4 4 7 4 4 4 Vl F--� M M M M M M M M M M M M M M M M M M M M M ~ a N ~ O N Q C4 r3 V) O Q• z " U M N (V I ) )0 N N O N N O) v) 00 N N a) M O Q M O (, b0 r. O Cr, N N N V v') O M rf M v) N )D O) N O) N Z Q N cn N 00 0o N o0 00 00 00 00 0) rn o) a) a\ a\ rn a\ a; a rn o 0 ,..y 4 b M M M M M M M M M M M M M M M M M M M tT 'ct _O 4 p.., 16 w -.1 p4 JC4x o O0000 000Oo 00000 00000 a s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p_' O v) OI) OI) O V) Ovi6 v) Ov) O �) 6k) OV) O Wr� '� ��j VD Q• CV O N vl N O N v) N O N vl N O N kr) N O N kr) t� O v Z <T< i-T• H 00 00 00 00 a) a a) a) O O O O .--- �-. - - N N N N M Q+ cei O - 41 /, •t v v v v v v) v) kr) v) v) v) v) v) v) v) v) v) v) CO 1 � ) H W W W W W W WWW W W WWW W W WWW W WW - V1 -• 00 M 0\ OA ,D VD ,C r--- r-- 061/4,C N 00 N N M N VD a v1 O 1O -• N N 00 V1 N 0 1O - M O Oi 00 1O 1D '.0 '.0 vl M Q W 0; -T N V v6 �� 00 O N M vl t - N N C . 00 O V vl l� 00 01 O -, N Tr v7 N 00 01/4 •-. N M 4 vl l- 00 O O 0000000007 CArnrnDNrn O00 00000 0 -• O• 173 - N 4 °: 0000070000 cncnv) c,r1c4 0000000000 0000000000 0rA OO N -'• vl M vl 4 M 01 0\ V 00 0\ 0\ M '0 0\ M -• V7 1 4 x O r O N 4 N O 0\ 0' 0\ O N N O O vl O Tt ooN U — M 4 v3 00 O -- M vi 06 O N 4 N U •-• V1/46 Q\ M vO O '-. N M Tr VD N 00 U O N M 4 v1 VD 00 0A O M V In 00 00 00 00 CO 00 00 00 00 01 01 0) 0) U 01 0A 0\ O O O O O HO O ,--. •--. --. N N N M M M V vv1 v l l \O 'D \D '.O l- O M M M M M M M M M Kl M M M Mc.-; M M M M M MM to M M M M M M M M M M M M M M M M M M M M MM C N Q N I 0) •7 a, O N vl M NNN M M eY M 00 M v-> vD >) u O .4-> -4 N 4 O N v O N 4 00 v6 N D\ 1O M O oo In N 06 N - N N 0) O N - vl l- 0\ O N V In N 0\ O N M- 'D N 0\ N r ` •-. ,--- N N N N N N M M M M M M 't V •7 V• In In � / C4 CA _ Cl) M U Q x 000) M N — 'O V' N M '.00) Vl M- '.O 01 N 01 N -• C-- 00 •-+ O a\ l` vl N 0\ Vl O Vl 0A N V1 00 O N v1 Vl 'O N 000 O - U ) � vl M N -- O 00 N vD 4 N 0) N 16 4 N O 00 1/46 Ni M � H Ldn N0, MIn NoONV l000 0) — MvN0\ ON cO F/ (7� 4• U \ 00OOO - ^ - - NN NNNMM MM O 0\ Tr Tr Vl In In vn Vl In vl Vl vl Vl In vn to ul In In In vn In In O Q > L-1 -, N Q N m O W C7 F., W Wl 1-4 — C Tr N Tt N M VO vl vl N VD 00 N 00 O VO ken •t VO N VO M VO 1.-ry�1 W O V oo Tr Tr U N Tr v1 M un vl vl VO VO 00 N v1 Tr --� 0, -•• 0 W .� O "" O O O 6 —. 66 O N O O N N N O .- 66 O N Q Cl) • wc7 • H � W ° O H 000) 01vn O (NI .. vl01 v.> on ON CP, kn0\ V) N N U P4 � bD — Ne VD r l` 00 0) 0) O O N N O -- O O -• -• NM /� Vl Vl vl V1 vl vl v1 vl N vl \O 'O 'O '0 'O �i:.) •661/4/3 \6 z H W - M M M M M M M M M M M M M M M M M M M M MM N Q (-1 Q � 3C/D © - U • ,O -• O l� •-• N 00 0) N '.O V 0) 'tt V N •--- 0) O O ,O U CIO VD Q `-- 6 ,-4 ,-; ,-; ,-; ^ 0 N N N N M OM N M N M M M M (-,6e--; ZO pa Z b ,1-1-1-4,r71- 71-1-1-1-1- 71- 71- 71-1- 7r. 71-1-1-1- 71- vv . w W o Q x Q O• Qa 0 Q r x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a p•, zH 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CC W 'O < p- ' In In In In In In W OZ < W4", NNON NON NONN ONNO N MMM v1InIn vlO ,Dl0 ,0 NNNN00 0000 CO Cd CO O I —I v1 vl lenvt vl kin In v1 vl v1 kin V> kenvkin l ken un v1 un vl vl Vl P-1 - • 1 i W W W W WWW W W WWW W W W W W W W W W W O N M O\ M N 00 N v) M O N K M t` O) O to \O M 0 WV) N O oo M O N v) N O) \O N N M oo M 00 -- 7 t` a\ -- ¢ F-7 W oo O M v) t� oo O NM v) t— oo O -- M4 \O t� 00 Oi -� M 7 , 1/40 , m0o O - ,1 ,,, , , oo Q\ O -. N M 7 \O H --� --� -� -� �-+ -� N N N N N Cl N N N M M M M r M 4z � O . CO NCS P4 p4 Cntov) v) CnCntotD CnrntotovD tototoCnCn totototo O 7 O) V) 7 N N N 'n t� 00 N \O O\ 00 0 N U O O\ O) C, C, O O O '0 N 00 7 O \0 N 00 V) -. t� 7 N O, r N t� M On vl o6 -4M s.606 ,—. 4 \x3 a; - 4E---; 0: N N N O M 1,-; 066 ,-; \O oo O) O .- M 7 w1 '0000' 0 — M 7 v) N 00 0 O N M 000 . . . . . - - - NN N N N N N N M M M H0 N- N 00 0000Q' 00\ 000 ' — --� N N N M mc-1 ,1-1- W M M M M M M M M 44444 444V4 4444 F440 M M M M M M M M M M M M M M M M M M M M M M ¢ Cn N 1--- Cr M V) N 00 ,--. M 7 \0 N 00 O -- N N N — 00 V7 ,>, U O < .... \O M .--I oo vl N (=J\ t� 7 o0 tri N O I` 7 -- oo V) - 00 v; 0 _ 0 7 \O 00 O) M 7 \D 00 O M N 00 O N M v) N 0o O - U �-' 0 vl kr) v) � ' s.o 'o 'C 'O N N N N N N 00 0000 00 00 0o rn P Q Cn m U W Z- < x N 7 V) '00 M t- N 00 M N Vn N v) O N 7 7 'D O U O 00 U H N v) '0 — N 7 vl t` O, —. M 'n N -- kn0) 7 00 0 P‘ ;:1" —. U N in M — O o0 \O 7 N6 o0 N vi M -- O 00 \O V) M— t!) ~ 00 O) --. V) t- O) O N 7 \O 00 0' M V) N O) 0c,171- VD i (24 W 4-, M M 7 7 7 vl Wn V) v) V) s.0 \0 %.0 %.0 ,.0 t- t- t- t- U O ^ V) V) vl V) v) v') V) vl v) kr) v) v) kr) V) v) v) kr) kr) If v) v) v) Q N cd >" F, CC W t--{ , O) 7 --, N \O 7 --, N 7 O1 V) O N \D M M N N U vl N \O rT) W bbO N N N vO U N �O M N N M 0\ 00N \0 N 01 V) 0 '3`" C7 W p oo X0000 00 -- o 000NO 0000 OW> N Q C/) H 0 W H O V) D\ M ch DD I` N [- M 7 M 00 ,-- [� \O 7 N V1 V) ,-- 00 V1 U W bA M kn U 0\ O) O -- O -- N M 7 \D t� r- a\ O O O M M v) ZQ W0 ' vi) v '.0 0NNN NNNNN 1---: t� Io000 00000000 ZJ M M M M M M M M M M M M M M M M M M M M M M O N C/c C/] O Q h r U bD M 7 t� M ‘..071- Int---O ,1-. . -. 71- NCA 7 M N N N kn v) M N Q N (+') �i -Ti) M M M M M M M M M M M M M M M M N N N N N N o pa r .1- 71-1- 7 7 7 7 7 -1-1- 71- ,r71- 7 7 7 7 7 .1-1-1-1- 1 7 7 7 H WO gxP4 ¢ OQa W .0 x 000,4 0 000000 00000 00000 0000 P-,• P-4 E H 000 00000 00000 00000 0000 6 vi O v O vi O O vi O Vi O vi O vi O Vi O vi O vi O 4 j Y < N O N V N O N v) N o N In N o N vl N O N v) N O W c� tiZ Q W W C4' 00 0\ 01 O) O) 0 0 O O ,--. •--. -, -- N N N N M ( r M T C.) -C8 W V ^ ) VVn v', ) ) IVo 10 Vo V:, VD 'O 'O \o .o \D VO Vo '0 \0 .o \o \0 W W W 1-1 . J w fa) wwww wwwww wwwww wwwww N 00 D\ N C N O O oo r 00 )D oo V) [� U I--- ,.00 ‘00'N ICA N N N N --- O 0NN V N O) VO N 00 M N '-. v) 0 ---- M W N M 4 vl )O N t----: o60; 66 -; N N M M 4 4 7 v) v) Q H H M M M 4 4 4 44444 4 O� vl v) v1 v1 v1 v1 v) v) ZZy 0 — N Q (49 c.,-) cncncnuoG7 cnc,) cn0707 � � � (Ac..) cn (AcAcnel O O M O) 00 O O N 00 v1 O -- )O M [- O) N O )O M )0 O M N 00 vl M O )0 N 00 V 0\ M N O M \0 O) -- 7 '.0 00 0) • U ' 00 - 4N Nv N 4rO) M 000N4 V vl N 00 O) O N M 4 v) [- 00 O) O N M 4 v) [- 00 U M M M M M V 44444 4 V vl vl vl v) v) v) to v1 HVkr, v) vl 'O \O 'O N N 00 00 00 01 O) O) O O O -� -- -- N W pp 4 4444 �t 44444 444 ,riv) v'1v- v-) v) r=4M M M M M M M M M M M M M M M M M M M M M ~ Q N U v M --' 00 '.O M 0) 'n O O) M \O 0) O N N N N N O o0 >, U O -i N l N O) vl N O) v'1 -- 00 CY O N M D, v1 -' N M o0 N _ N N M vl N CO O N M v) N 00 O N K) v) )D 00 O -� M •71- CV N CV U �' -. 0\ Q) Cr) O) N N N N N N N N N N N N N N N N Cn Q c _ Cl) Cz W = Q x 00 00 0) O )0 N d- 'D O 00 N M - N Q1 V O V M vl [-- [- N N 00 M O1 O N 0, 00 U ,-. N ,4- r--- 0 O 00 ` F"' M N N O O•) N \0 triM N r- 0) 00 N )D vl 4 M M N O O ti-.) H a. Q) 00 0 - Mv1 [� O) - M71- )0 000N71- '0 000N ,71- ‹) i ,,/ W CI-, N 00 00 00 00 00 006, 0) 0) 0) 0) O O O O O --- --, -- -- C.) O^) w /� v) to v1 Vl V� vl vl v) v) vl kr) vl �D ,.D ,.D )D �0 ,.D \4:) \.0 )0 N -- Q N 03 O 001/) N N N M -- N v) 0) O '.O '.0 N M .-- N 7 f-4 c.. r., \ 0 W 00 O [.- 1D 00 [- -- N v) v� N 00 O N \O 0) N crrn O M 0 O O -; 6666 -. 666 - O -- O -- O O O O N �--, O > b c) s_. w N x Q Cl) CD wcD H � ) ° x 1- O H 00 N M O )0 -- v.) )D \D kr) (-4 N co \D )(=> )O N )D r j W N 0) •--- N 'Cr M M M M N N M 'cr )0 [- N N co 00 Z00 0 ) O) 0\ 0) O) O) 0) 0) O) O) O) O) 0� O) O) 01 0) 0) Qnw .b 0 O M M M M M M M M M M M M M M M M M M M M M N .-• N Q `-•1 Z UM rh V U bD M .--. M -+ O) 00 v) v) M N 01 N '/) C00 O U N N v1 y Q N M .� N N N N -; -; -.4 - O 6666o; O O) U 0) 0) F .- Z ..1- ,r ,rd' CY et ..1- ,t-1-1-1- 7/-1- ,1-1, 1T M M M M O p4 — • /W2 ,.w// O Oa• . a) w ..0 fx x o 00000 00000 00000 o0000 a, a E 0 00000 00000 00000 00000 X O cn F" N vi OvIOviO � OviOvi Ov) Ov') O O Ovi P-4 cd O w ^ N v) [� O N v) [r) O N v) [D O N v) O N v) 00 O N L-1 VI v) \D )O )D )D N N [� N CO 00 CO 00 O) O) VD vDVDVDVDVD VD \C ' VD0 \D VDVDVDVDVD • r- -) 1-1 • W W W W W W WWW W W WWW W W WWW W WW 000 cn 0 0 -, - O 0 C 000 O N vI M - 00 � W O V1 V'1 \D \O \O \O \O V) V'1 V) Vl V1 N r 4 V 4 M M MM ul \0 N N N I� N N N N 00 H p N N Q 00 Cl) V] V) C/) 0000000000 to 00 00 00 00 c.4 (4C/] 00 00 00 to O O \D — 0 N 00 00 M V7 \O N t� N t� N V 00 V1 co O N V) \O V)\D V MN O 00 \0 M •-' 00 \0 mo t--- ' ) N x O ^ M -' M V1 00 0 N ' ul O N c) ,-, m ,71- .in \D N O) 0 N M 'n r o0 6) O N M V) \O \O \O \O \O '0 \ONN NNt-- N t-- sr- 00000o 0000 HC \0 M M M 7 V Vl ( \O � \O r- N N o0 00 00 00 Z W by � �, � � v, � v, v) I v, � v, � v, � � V) Vi �I M M M M MM M M M M M C') M M M M M M M M mm Q Cl) N \O V' M O N N N N \O O M \000 .--. M \O 00 O N 'V' 1--- CT U 0 4 O \6N [- M 00 4 O) V') O O \O ^ \O ^.-, (--: Nt-: Nr.-: C) \O 00 0) ---' N 7 vNNMM 't N oo .c',11- c.,7- '44 °4- O) ^ ,...,4- , N o0 r....- U [. N N N N N N N N N N N N N N N N N N N NN (21 C/) _ v) mt �-' Q x 00 ,-' '-. 00 M V) V ^ M M V'1 C) N \O N 0 00 0 '--- 0) N C) r. O oo U E M t- O M 00 M O) V) - 00 In N O 00 \O ^ O 00 ul M ^ �-+ QJ O� 00 00 l� \O \O V1 V) V) M M M M M N N N N .yLin r4' 14 Q+ Q,) t� O) ^ M V) N O) ^ M N C) ^ M u1 t- O) ^ M u) N O) 1 (H ^ ^ N N N N N M M M M M d' V V) V) In V) V) O Q) / \0 \O \O \O \O '0 )O )O '0 '.0 'O )O 'D 'O '0 '.0 'D '0 1/4.0 \0 i-. Q > I--I w N CCI C) .-k `/ c' W �/ 00 U M ^ 00 V) '\i' Q) O - O) V 0 N \0 \O 0 M O) ma, 1:4 t� V) V1 t� V) t� N t� ^ N M 00 O) M - "I' M M V VD ,--. N ^ '-' O ^ O '--' O 0 N O 00060 00000 0 O W W o O > b 4-1 . z Qtn CD W U Q H 0 H O '--1 V1 00 \O 00 M N O) V) M0 ,-, 0 \0 O) 00 N '--' Mr- 00 [- ~ • 0 0 ^' ^ ^ •--' N ^ NM M M M eq .- .-. ^ ^ NN V N U 01) 66660 00666 0 0 0 0 0 66660 66 Z Q W 7::, .71-1-1-1-1- 71- 7r71-71-71- � ,zrvv �' z!- -1- 71-1- - vv P.., N N Q a z _ ' U an v I^ O 00 d- M O C) 00 N V) 071-00 N N \O V) \O N \D M Q N M 'N C) CT (T GT 00 00 000000 N N N N t� N t.-- N t� t� t� t� N ,..ti Z7:3M M M M M M M M M M M M M M M Ch M M M M m , _OWa4r-' HO � � a � Q i .. ,.In P4 x 000 0 0 000 0 0 000 0 0 00000 0 0 P. A. F-' ' 00000 0000 00000 0 ( 000 00000 0000 OO O P � � V) V) V) in WZ NONt� ONt� ONt� 0 NNON t-- cn - W - O) O) O O O O ^ ^ ^ ^ N N N N M M Ch M 7 P, Mt O ,szi W Q \o \o N N N N t� N N N NE---- N N N N N N N N NI---- W W W W W W W W W WWW W W WWW W W W W W M 4 Vn N I- M O\. Vl h 00 h h 4 NCC' — 'C N vl .-. N a C) 00C1 on ,.D M Ol \O N 00 O ' lD N OU N vl 00 O M-< W N N N -• ^ �-• O O O O� OA OT 00 00 N N <D vi lc; 4 M M H 00 00 00 00,71- 000 00 00 00 00 OHO 000 OT 0) 0) OT 0) 0) 0) U U of O O H ¢ CVN z � oQ � � � � � � � � � tn � � � � � � � � � � � � O O 'C vl 0) vl ^ h vl M vl o\ ..71- -- N M �D N ' ^ N N ON \D M 0N \D N O 1-- 4N O 00 '7 N O 00 vl M O • O h r• M v <5 00 O N M vl 0) O N v 00er: - M vi 'D h 0) C' - N M vl 'D I- 00 0) O N M V v) 'o h U O '- 000000 0l 0) 0) 0) 0) 0) 0) 0) 0) O O O O O O O O - - N N N N N N N N N N Z H O Ol On 0� 0. O O O O ^ ^ ^ r• N N N N M M M �t 7 �J N M M M M M M M M M M M M M M M M M M Q N O N M .. . „4 „ 'C h 00 0) O N M M M N �-. O 0) >, U 0 < M 06 ri oo ri 00 v 01 V Cr.: 4 0T 4 O kr; C kr; O vi 0 vl 01 O _ U O r• M 4 VD h U O N M vl VD 00 C' ^ M 4 'D r-- 010 ,-, • [� UE-:, c4-1 N N N N N N N N N N N N N N N N N N N N N N i-. C/).--, Md U d x vl O M M 7 h O N VD 7 0) vl N 0) 'D 00 'D vl h O M r. O 0) h vl M ^ O 00 'C vl 4 N ^ O 00 h �D VD �O �D h h 0 0o U 0 N -; ^; --- � -� � 0 00000 00) 0) 0) 0) 0) 0; o) oi .y In H d,) ^ M v1 h U M vl res., ^ M vl h 00 O N V 'C 00 O N w C4') 'D 'D 'D 'D 1p h h h h h 00 00 00 0000 0) 0) 0) 01 01 O O U O) W ^ 'O 'D 'O 'D '0 '0 'D 'O 'O 'O 'D 'D 'D 'O 'O 'O 'O 'O 'O 'O I� N I•. N > F- r-. • N r�� F'`'� 1-4 ,, N vl h vl O 00 N O 00 00 N M N M 'O l- N 0\ M 00 --' "d W rn 4_1 bA O O M vl N 00 4 M vl 0, 00 ,-. ' 4 M h '0 vl M o N O 0 0 OOO OOOOO OOOOO 666 ,-; c5 OOOO � , N Q � • we ¢ H � a ° _ ▪ O H U N �D M o) 0 h ^ M 7r 01 N h v, h M 7I- VD 'D M U M Ob N M Cr vl �D V'1 [� I� h l- [- O - O M vl vl I - I- h h C4 f-�I 666 O O O O O 6666 �--� r• -- - ^• d d- V 7 V V ct V 71-1-71-1-d- 7 7rV' V N d C1 � � 0 Q)-- U �l O 00 O 'D h 7 N 00 vD v 'C M O kn l� 'D h M 'COO 'C --• ¢M M U 0 h h N N h h h h h h h h h h h h 'D 'D 'D \D 0 Q w CA ~ Z '0 M M M M M C.) C•1 M M M on M M M on M M M M M M M O d a .0 Q 1 00000000 000oO 00000 0000 P.4 a E-417-;E OOO o000o 00000 00000 0000 'O Q) O N h O N h oc.lkinso N � h O N h O N W 0 Cd Z Q w `- ' vl vl vl vl 'C 'C 'C 'C h h h h 00 000000 0) 0) 0) o) O O p. c�1 U �j w F-1 -.) ti W W WWW W W WWW W W WWW W W W W W W O C )O N M O) N M - v') v) M O) M N O) M 00 ll M V )D 00 a, O\ O O O O O O O O) C71 00 N 'P \O N '' W N — O Cl 00 N [� vO Lei 4 M N --, Os 00 h vO vi di M M Q N M - kr) AO h 00 Oh O ---' N M M ul 1O h 00 CA O O O O O O O O O O ---- r+ ,-- .--. ^r .-. --» .-ti — --. N H ¢ N N N N N N N N N N N N N N N N N N N N N O Z NLS 00 CA 07 00 CA Cl) CA CA CA CA CA CA 00 CA Cl) Cl) 00 00 CID 00 C/) O O h ---. )O v) kr) O) — Ch 1O VO v) c') ^- O h —. O )O h vl N U )O M �--- h ' -. 00 V.) N 00 M O) k/) O VO O x O )O 0o O ---� M v) h 00 O N M � h oo O) M-; N M 00 C N M v) D h 00 Cr)O) O N M .1- v) )D h O) O N N N N N N N N K1 M M M M M N N N N N N N N N N N N N N Cl N N N N N N H v') kr) )O )O )O )O h h N h 00 co 00 O1 O) O) O) Cr, O Z a M M M M M M M M M M M on M M M M v6 vS v6 on M M M M M M cipN -b < O Q o0 )O N O h ) ---v 00 v \ v ) N O ) �--- )O N N h CO ) M O U r-- 4 U O) V o0 M oo N N N )O -,Ch O vl O) 00 en 00 a Q) M )O h O) O N M v) )O 00 C\ _ N_ kr) 1/4-0 00 O1 N CA N U H ( N N N N N Ch Ch Ch Ch Ch O O O O O O O M M M M M M M M M VD ..... Cl) asU W • _ < x O h dt kr) O OM h M l 00 --. )O 4 ) 00 N O O N 0 I O U +--� CO 00 Q\ O M V DD O �-- M v) 00 ,--. '�t N O N 7t )D - Q) O1 O1 O\ O O O O O O ,-- -. N N N Men M M •,-, i1 H a O O O M v) h O\ �-- M v) h O, -- M h ON -- M v) — -- Cl N N N N rl M M M M V' .1- �Y O W n h h h h h h h h h h h h h h h h h h h h h N H > 1 1 i-. (21 N cd O On 4., L� cd 1- W1 ) IIll M co --. O M O M 00 M N VD If ,--1 N ^ M Oo N M M I---I r4h O h v) co M M M .:11-.:11- M M ) N))O O )O O h C') 0 )O V) �O W 0 W 0 0 o -- 6660 00000 00 -- 00 66rienv6 Owb -- N z Q CA � o )-• x x 1 W OH � O) h N )O O) )O M V) M O B O O v N O N M UC4 COQ t- O O) • N M M M M V M N v) v) O M I-� F+1 N N N N N N N N N N N N N N N �-. O N ZQ W b v v v v v c v v v v v v v v v v M a N a � ON d Q ) 0-1 U W N O) 00 00 '.O N M U) N O 0) N N 00 N )O O)-- 14 U a) kr) )O kr) M M M N �--, -- N ---, O h 00 l0 )O )O -� O Z Q N ril C') "I:) M M M M v6 v6 v6 en en en en M M M en t-) en en M M M en M M M M M M M M H 0 � xc4 ¢ Oma a)Q W x o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Pi a _ 0 00000 00000 00000 00000 O � Q+ a) � h O N h O N h O N � N O N N O N W N 0r Z < W 4-+ OO -- --^ ---- '--' N N N N M C) C) K) v) I ) V') P- N (-) � u-i Q 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 W W 0 W W W W W W WWW W W WWW W W WWW W WW \O oo N O V) v') O O M M N N M O O\ \D o0 M 71- N WV) t- Q\ ^ v) N -- --- N M N O - \O U .-. C\1 W c+1 .71: V) <306 O\ ^ M v) t� O\ M V7 <3 t- t-: o0 00 00 co O\ H - N M v vD 00 Q\ O ^ N d' I \D t- 00 Q1 O N M V N N N N N N N N M M M M M M M M M 7t 'ch 7rV H < N N N N N N N N N N N N N N N N N N N N NN 0 z a NC: (2 Cl) V) t/) V] V) Cl) vo t/J V) C/) Cl) f/) t/) tl) V) Cl) tl v) � to mmm , �r-� O ,. 'C N D O O M Q\ -• M .„ V .„ OM 00 _ ,. 'C N \) 7 O µ, U O\ O\ O\ o0 oo t� v') N O r- V ^ oo vi .-- 0.646 < ("0 4 \O N 00 O` O -. N M d' vt 'C '0 N 00 0o O\ O O ^ -. r,1 M M M M d' '1t 4t 1 71m71- V �f V) V) in v) v) N N N N N N N N N N N N N N N N N N N N NN X H U O\ O\ O\ 00 0000 N '0 ' V-1 ,71-,1- MN N -- •-• O O CNO\ ' 'dc �D V3 ‘,731/41 \O \O knkri ZtIO F,+y _M M M M M M M M M M M M M M M M M M M M mm < IN O \O N \D \O M 00 M 00 N \O N - -. O\ N M 00 0 .-. .7'\ U O r--. MC-IN ‹) ' )/l O1 M \O O M N O M \D 00 O\ — M V 'CN N _ N v) l 00 O -. N v) N 00 O\ ^ N M ct V) N 00 O\ O U H c2 M M M M M M M M M M M M M M M M M M M M MM 0) • HCl Q Ci) 01 1--1 U Q Fes"' •:r O N \D M N oo D1 \D \D 00 v O 00 0( \O t- V) N N O1 o U oo M D a N [- O [-- ^ D, a, N Q, t- vl 7 v-1 ,.0 r y M 4\ 4 4V) 4 v) t) \D \p \ o0 01 O\ O N M vl O\ ^ M. v) IQN - Mv) t- c› , NO ^ \O o0ON O ^ r- 4-. Vv- V) v) vD \D \pt- t- t-- t- 00000000 00Q1\ WW o NCNNNN NNNNt� NNNNN NINt- N [N NN ' / S. Q� > , Q N d O 3 �1 W F W �/ — C ' - N N 00 t\ O t-- en V) 00 N -• Q\ O M N-. �t O M M M M .d W h F+. by Ni N 00 Q\ 0 7 M ,r, V O ^ O 00 kD N v) a\ v) \O N W r \D M 66 \O o0 v) -. O ^ O -- v) 00 N O O N N -. o O o W �, Nx Q � 4--IC.7 H � , ° x Q H M V' M \O \D O •-- O M 00 IrI N \D v) O N (TM M U p4 COb) N \O N O\ v) -. \D 7rN v) N M v) \O v) 7rO N M Z Q W -0 M M OM N N N N N ON N N N N N N 6666c; U D\ 1. 1 N CID (1) o W UW • V U V) O V V) v) O O N N ^ V O\ V \D � N O\ v) V) \p 44 '1 :1 j< 'U U b4 0000 N 00 00 N v) N N N 00C-- C,1 ^ V M -• N ^ \D M N .M-. b Z M M M M M M M M M M M M M M O Z N N N N N N N H O xfz4 ¢ 0Q a¢. a W )-� C4 .. -c C4 x 00000 00000 00000 00000 00 G. a H 00000 00000 00000 00000 00 X O Q" N t� O N N O N N O Nvidvid � N O N vi O� N O N t� O W W - Z < W 4 ' v) \O \p \D \p t- N N t� 00 000000 O1 O1 O\ O\ O O O 0 ,-, G. M0 ,/z,0 W._, Q o0 00000000 0000000000 0000000000 00 0o Q\ Q\ Q\ (TON Cn ,-a .� W W W W W W W W W WWW W W WWW W W 1.1N-Ll W 00 .-. v VD 00 O) Ln N 1 7. O 00 CO h O CO O )D o0 00 O h W � •-• O O) N 00 O in 00 N a, O 00 N 7t h CO O) O O h Q W U 0 O) U O) 0 O -- • - N N 4 v'; )DoeO) O N 4 ii v'i v'1 )D h 00 al .--, N M V'1 )O N 00 U O M v) h CO 71- d' 'd' VI kr) u1 N v'1 kr) if) 'D \O 1 \O H Q N N N N N N N N N N N N N N N N N N N N N N z p z a ) N (-1 rOrr� O 'C O v1 en N r-- O 000VV) h N tt VD O [� O en 'Cr O O i-4 U Q1 v) O N oO M O O N D\ kr) .� o0 t7' O h M O h N en N v') )D )O h 00 00 O\ Q, O •--. N en en V v') v) tin kin Lin kin in N in V) in in to v') kr> \O l0 )O )O 1/4.0 )D )D )O )O N N N N N N N N N N N N N N N N N N N N N N H 00 00 h 'O )O in kr) 'Cr M M N ^ —. O O O) O) 00 00 h h Zen M M M M en M en M M M M M M M M M M M M M M M • Q) • N Q O h )D O, v> .--i h •--- V 'C N cr. O 'C -- kn OT N o0 en h O U O a-+ 00 00 O\ O N 7 V) h 00 Q1 .-. M 'C 00 —. M V) 00 O M V) 00 Q) _ Q) N en VD h 00 O) O N VD h CT O — Nkin kin WI kin kin kn kin - kr) \O h • h• U Hc+-+ en en en en en en en en M en en en M M en en M en M M en en M M M M V) O Q c U ,_ �-' Q x N v) 0 In .-• .--- N en )D )O N 00 U ) vM M M V') O) N v) \O 'f M N -- N M 1 O> N )D O O) M h N co O 00 U (� N h O N 4 'C oo O N �r )O 00 O) O N M v) 'C h O, O N M .y V') H a Q) M 'C 00 O N h O) .~ en v> h O N VD CO O N Ln h O\ i W 4--, U Cr, 01 O O O O O •-- ^ ^ N N N N N M M M M M O 0) ^ h h h 00 co 00 00 0O 00 CO oO 00 00 oO o0 00 00 00 co oO 00 00 i-. J F Q N ai O - [ alW W � C ' .-. .-- en kr) en s.0 h en -, en en OO k N h O O OW F24 bb O W C) O) M •—� _ ^ N 00 co N V N enN O O O O 00 M r•-•O O ✓ 'i •--• •--. M )D -. —' O •--. -, h v-) O O N N O en O i-. >, CVx V) W 0 < H - a4 x W O H v O) O ••-, 00 en v M en h O) N O k/) )D 00 N 00 N U p4 as ti) O 00 00 O O O) h )O M cr V N M O O O N O\ L) W "� U 00 00 O; O) 00 00 00 00 00 00 Q O) O\ O� C O) O ••-.1 O ZZ ( N N N N N .. A-. 01N N Q a U�r-� W • O) ',7r 00 ,•.. U •--- v \ v) N) OON 00 h h N cr 00 00 O1 O) co O) M �./ U CO co to M O) U h N 00 O1 M )O M N O N O) N O N •--. Z < N `�' z "d N N N N N N N N N N N en en en en en en en O O M M en en OO O rs: Q Q Oda„ 0 W a az p4x O O O O O O O O O O O O O o 0 0 0 o O O O O a a_ z E �, 000 00000 00000 00000 0000 X' O 0 Q)F' V) okr; okr; 6Ino Iriokr; ov) o kr; Okr; 6 v) o v; o W Q Q W N N kr) h O N kr, h 0 N u> h O N v') h O N v1 h O N N 4-r __, ._, N N N N M M M M vr 7 v7 kri vn ul )O )O )D a., CZIC1.) O t Q O) 0) CT 0) CTO) o) 0) O) O) 0) 0) 0) rnrn0) rnrn o) o) rno) W r- V) a w H H N zz .� O � N C21 H r'' N z H 0 41 Z M Cl) N >' u 0 d 4) d rq > U H M cnQ d U d M o Co U H v W0 4 co + a) Q coQ N ct O � . \ 00 p 3 0 w N�o o ami >' N c/) 1.2 W C7 M < H .-. a O H N U M tip 2> 4. Z w 'C N 'RI N a> O d cnO\ en ¢ z Yd M 0 a NU¢ oAzw � 0 CZ4 ¢ O .< Q xrz" ¢ o a Q U O eii 'Pc z ¢ w P. cd o � wQ °� 0 • . raw O (1.) -1-',., o L � � LU --O (n Z o 0 ,-i-i >` _ -0 (7w _ ate (1) w Z w N c O H (3' 0 N QU .. -O O O mOZ Od z N U o (3 N M ,-i ,.-i - 0 O tQY 0 Z Q - CT in - 0 0 - 0 C0 00 Z 0 Q - U 4- Z O d • 0 w Q U 0 LU W in o cn rn - Ln w N , N 0 - O O J O w = D N 0 - O O w0 O H CO _ M • U _1 a Z -I 0 0 Q (n - 0 0 cn z 0 Q - N J in Q >- N-- Zrorz O w w - 0 0 Y o CCaQ O D ° Cl_ a o X ,, +� ra -O d U J Ln 0 Lf) 0 in 0 in 0 In O � M in N N ,--i NOI LVNI lDNI >- OD W _ o � > o LU , D o � J • L 0 0 - ,--i a) � w 2LL uj -- c 0 • O o QVI 0 1-J N --U 00 Cl._CU 0 Z CO O 2 O co U - o (7 N M ,_i0 � '_i O ro 0 Z Q I - O O 0 CO U - o ,Z_ 00 Q N U r. 4-1V- ..,_,... 0 ~ z W (7) 0 o Q U - 0 W ce L 0 V) d� 0 < in w O 2 N 1 N 0 0 O J o J -- W U' N 0 - 0 -• o 1-1 m O (n U n- Z '--, O 1-1 LL J 0 Q 0cn o 0 () Z _ N Q • J co- . ,Q N Z m N. 0 O w W O Q Or0.-.. • • O a • . .m...--0 O e[ � % • CL d • xO 4.—•• W -_ • , • 0 � u 0 0 0 0 0 0 0 CL J 0 In 0 in 0 In M N N +-I *--I H.inwlzd >- (13 W a) a- > : O > '-+ LU O ~ O D O 0 ,-I U) L ZO0 =1 � _ 10 (9 Lri a) W Z w N c O H kgo � Q 0 cOn NO- .. .-.0 O - ,-1 CO p Z 0 00 U - O C7 - N co - .-1 i 0 co• Y0 Z Q in ,-1 -- - O _O O - c0 (.7 Z _ O 0 U) 0 Q - N U +, LI- .......0 N (.9 po H z O d U) O W Q 0 U - 0 W CO CC Ln O U) alO - in W k O O dr -- U-Id_ Z c 0 - o < • (n O p Y - N U) Z Q J rrl ..QN -- p Z m O O W W 0 • 0 O Jo1 CL .. d 0 I 11 --1 X ,-O Li O O O O O O O O 0 CL 0 v O O O O O O O O J 0 0 0 0 0 0 0 0 CC) N '0 in '71' M N ,--c ( i) 1-11.dD4 1VJIfiDA • . caw _ o � > v o O O rF- J O (f) LZ Q- .-i (.9H __- 1J V U_ +O-+ LU L C OF O a) N i- L O L. Zm= .--i co U top_...-- ...�s•—♦ o m N �'• r..• Z QO • • y Ln •--.—..= 1) �• O O 00 u Z c~n O o O U _ N -1 Z _ O = cn o a Q � w U -• p co . 0 w Ln rY mi o in • • o Q Ni -. Ln W N O J O W O N (..7 1-1O V) • 0 m J - M U a 0 OJ i < - O (n Z 0 QN J M Q >- N. ^Q N ZmQ - O w w - O Y Q O= IY O CIL p Q ,-i O J a' a a o LI)X .. u i 1 1111 Ol CO N l0 LO 4 M Ni .-I O (1-100T/5 P) AJR A S D 1DOG >. (0 W • Q > 0 O • O i~i = n Q L In ZZ W N N▪ LU I- Q C Q U Q • O m 0 N i .-i N CL Z ap U o c: ( N Y1 .-i >, 0 ( Z Q in O 0 O N Z Q U N ' 0 O Z Q • U` U Z 00 CAF- W Q1 •• •Q ••• N O N O O O J J W I N 0 D W O ( 0 • J m O ma U in HQO Y• U) cn Z Q J co Q >- f' ,---.Q N Z m cy O WW F- O Y Q Q 0 O D a CL C 1 i >C 0 W - :� 0 0 0 0 0 0 Ti-) Lo, 0 0 0 0 O J in O .-i Lfi) 0 N N. CDN (4) DNIH12iON Survey QC - RGS-CT _,pecification Sheet gyro/ ata SURVEY QUALITY CONTROL- SPECIFICATION DATA PRE-JOB CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 64 270.75 -948.52 -0.00023446 -2.23 63 270.75 -942.90 -0.00023307 -4.17 62 224.28 -1417.17 -0.00035339 -8.75 61 224.28 -1416.08 -0.00035312 -10.43 60 46.46 -1429.66 -0.00035624 -1.96 59 46.45 -1426.28 -0.00035540 -2.55 58 1.21 -1621.21 -0.00040778 -0.77 57 1.21 -1615.02 -0.00040623 -1.67 56 329.13 -1388.26 -0.00034758 2.41 55 329.13 -1379.97 -0.00034551 -0.05 54 299.98 -1083.18 -0.00026889 -1.17 53 299.93 -1075.96 -0.00026710 -2.12 52 271.38 -943.97 -0.00023334 -1.31 51 271.44 -943.23 -0.00023316 -0.61 50 238.88 -1235.49 -0.00030678 -0.95 49 238.88 -1232.82 -0.00030612 -0.57 48 208.99 -1539.32 -0.00038557 2.92 47 208.99 -1537.64 -0.00038515 2.73 46 179.02 -1573.86 -0.00039591 7.43 45 179.02 -1578.56 -0.00039708 7.47 44 148.38 -1363.62 -0.00034135 10.32 43 148.38 -1361.02 -0.00034070 10.27 42 118.70 -1061.17 -0.00026335 10.04 41 118.70 -1055.53 -0.00026195 7.61 40 90.15 -983.60 -0.00024312 6.72 39 90.15 -980.32 -0.00024231 6.46 38 60.31 -1242.88 -0.00030848 3.06 37 60.31 -1244.52 -0.00030889 3.59 36 30.10 -1597.63 -0.00040001 1.00 35 30.10 -1599.08 -0.00040037 -0.28 34 1.06 -1627.36 -0.00040932 -8.26 33 1.06 -1624.95 -0.00040871 -9.39 32 269.11 -979.28 -0.00024206 1.87 31 269.11 -984.80 -0.00024342 -0.35 30 225.92 -1438.37 -0.00035847 -11.12 29 225.97 -1442.88 -0.00035958 -13.52 28 45.79 -1475.80 -0.00036778 1.74 27 45.79 -1462.20 -0.00036440 0.53 26 0.49 -1660.78 -0.00041770 -0.05 25 0.49 -1660.20 -0.00041755 -0.18 24 331.10 -1442.41 -0.00036130 2.67 23 331.10 -1438.81 -0.00036040 3.10 22 300.80 -1115.76 -0.00027703 6.01 21 300.80 -1105.20 -0.00027441 6.01 20 270.66 -982.66 -0.00024289 3.32 19 270.66 -987.85 -0.00024416 3.89 18 240.39 -1242.87 -0.00030847 3.03 17 240.39 -1238.76 -0.00030746 3.47 16 209.55 -1580.84 -0.00039588 0.25 15 209.55 -1578.19 -0.00039522 -0.13 14 180.55 -1634.64 -0.00041115 4.74 13 180.55 -1622.98 -0.00040822 4.37 12 150.41 -1411.18 -0.00035343 12.80 11 150.40 -1406.13 -0.00035217 11.08 10 118.84 -1079.92 -0.00026800 14.48 9 118.84 -1078.11 -0.00026755 14.13 8 90.12 -977.21 -0.00024154 12.55 7 90.12 -980.02 -0.00024223 11.82 6 59.21 -1297.69 -0.00032215 6.55 5 59.21 -1296.37 -0.00032183 8.11 SURV-Q167(OPS SUR-MA-003) 19`"Nov 03/Rev 15 Page 1 of 12 AK0113GCM102 Survey QC - RGS-C. _Ipecification Sheet gyro/data 4 31.46 -1614.25 -0.00040400 0.96 3 31.46 -1621.03 -0.00040569 2.19 2 0.08 -1710.48 -0.00043016 -0.39 1 0.08 -1711.17 -0.00043033 2.09 MBO = 0.56 Gravity Error= -1333.28 Scale Factor Uncertainty = -0.00033277 Rate Error = 2.20 POST-JOB CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 64 271.59 -927.38 -0.00022924 -2.26 63 271.60 -910.14 -0.00022499 -3.41 62 225.22 -1386.81 -0.00034573 -11.47 61 225.22 -1385.97 -0.00034552 -15.08 60 46.32 -1407.77 -0.00035082 0.89 59 46.32 -1406.87 -0.00035059 0.70 58 1.59 -1568.25 -0.00039450 -0.11 57 1.59 -1555.01 -0.00039118 -0.53 56 331.35 -1368.19 -0.00034279 0.68 55 331.34 -1366.33 -0.00034232 0.29 54 301.44 -1055.53 -0.00026215 1.92 53 301.44 -1053.80 -0.00026172 3.36 52 271.81 -918.45 -0.00022704 0.85 51 271.81 -912.10 -0.00022548 1.81 50 239.59 -1195.73 -0.00029687 0.77 49 239.58 -1187.49 -0.00029483 0.10 48 209.94 -1501.76 -0.00037609 1.91 47 209.94 -1501.11 -0.00037593 2.22 46 180.64 -1535.66 -0.00038633 6.43 45 180.64 -1532.76 -0.00038560 5.64 44 150.69 -1332.28 -0.00033375 7.97 43 150.69 -1329.83 -0.00033314 7.32 42 120.09 -1031.36 -0.00025606 9.58 41 120.09 -1028.13 -0.00025526 9.44 40 90.46 -956.19 -0.00023635 8.09 39 90.46 -949.87 -0.00023479 8.57 38 59.29 -1234.00 -0.00030637 4.70 1 37 59.29 -1232.42 -0.00030598 3.05 36 31.01 -1537.35 -0.00038486 3.22 35 31.01 -1538.80 -0.00038523 4.29 34 0.73 -1613.94 -0.00040596 2.69 33 0.73 -1595.65 -0.00040137 3.68 32 270.53 -955.89 -0.00023628 3.01 1 31 270.53 -944.87 -0.00023356 2.45 30 224.66 -1410.23 -0.00035162 0.55 29 224.66 -1409.50 -0.00035144 -3.72 28 45.02 -1430.98 -0.00035673 4.11 27 45.02 -1428.69 -0.00035617 4.62 26 0.32 -1580.28 -0.00039752 4.69 25 0.32 -1576.26 -0.00039651 5.45 24 330.02 -1370.31 -0.00034318 5.38 23 330.02 -1365.36 -0.00034195 6.45 22 300.52 -1064.59 -0.00026433 6.20 21 300.52 -1060.68 -0.00026336 4.14 20 271.35 -940.41 -0.00023246 2.44 19 271.35 -927.81 -0.00022935 1.69 18 239.86 -1214.36 -0.00030146 5.08 1 17 239.86 -1211.20 -0.00030068 3.75 16 210.02 -1508.02 -0.00037765 5.50 15 210.02 -1518.72 -0.00038032 7.14 14 180.67 -1548.72 -0.00038960 10.90 13 180.67 -1554.85 -0.00039114 10.23 12 150.63 -1348.35 -0.00033776 14.53 SURV-Q167(OPS SUR-MA-003) 19"Nov 03/Rev 15 Page 2 of 12 AK0113GCM102 Survey QC - RGS-C, _,pecification Sheet gYM/ a 11 150.63 -1346.30 -0.00033725 13.93 10 119.43 -1045.91 -0.00025962 17.34 9 119.43 -1045.34 -0.00025948 17.27 8 91.68 -943.01 -0.00023310 11.09 7 91.68 -937.14 -0.00023165 11.61 6 60.13 -1236.59 -0.00030694 10.21 5 60.13 -1238.09 -0.00030731 10.87 4 30.03 -1549.14 -0.00038791 5.38 3 30.03 -1535.49 -0.00038451 5.10 2 359.72 -1590.25 -0.00040002 5.17 1 359.72 -1579.05 -0.00039721 4.92 MBO = 0.62 Gravity Error = -1288.65 Scale Factor Uncertainty = -0.00032167 Rate Error = 4.45 INITIALISATION Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs(ERMeas ERm o) 146 9.39 148.92 0.0687 147 9.39 149.05 0.0761 148 9.39 148.93 0.0944 149 9.39 149.01 0.0896 150 9.38 148.93 0.0994 151 9.38 149.09 0.0842 Average 9.39 148.99 0.0854 Tolerance on Average* 0.0823 Standard Deviation 0.00 0.07 0.0115 Tolerance on St. Dev.** 0.10 0.2° 0.0389 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/Cosl)*4[(cosA*SinI*0.1)2+0.0821 °/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cos1)*4[(CosA*SinI*0.1)2+(0.082/(n-1))] °/hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 1497.74 5300.20 40.46 135.61 0.004 -0.005 -0.004 0.004 2 1432.74 7599.91 37.58 140.99 0.002 -0.003 0.001 -0.001 3 1580.11 9693.81 30.47 121.65 0.015 -0.016 -0.006 0.006 4 1355.83 8500.02 36.36 141.52 -0.005 0.006 0.000 0.000 5 912.93 7599.98 37.63 140.98 -0.008 0.008 0.007 -0.006 6 1646.21 5300.56 40.60 135.71 -0.009 0.009 0.004 -0.004 7 1610.59 3060.25 9.51 150.23 -0.006 0.005 0.001 -0.001 Average -0.001 0.001 0.001 -0.000 Standard Deviation 0.009 0.009 0.004 0.004 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth SURV-Q167(OPS SUR-MA-003) 19`"Nov 03/Rev 15 Page 3 of 12 AK0113GCM102 Survey QC - RGS-C ..,pecification Sheet gyrO/ aata • Inrun * I Outrun * I Difference I Inrun * I Outrun * I Difference 50.00 0.33 0.29 0.04 301.92 287.07 14.85 75.00 0.20 0.22 -0.02 333.52 234.41 99.11 100.00 0.07 0.07 0.01 2.77 175.67 -172.89 125.00 0.08 0.05 0.03 24.23 131.50 -107.27 150.00 0.08 0.05 0.03 45.69 98.42 -52.72 175.00 0.09 0.05 0.04 67.15 65.33 1.82 200.00 0.09 0.05 0.04 88.61 32.25 56.36 225.00 0.08 0.06 0.01 101.75 7.59 94.17 250.00 0.07 0.08 -0.01 114.39 346.67 127.72 275.00 0.06 0.09 -0.03 127.03 325.75 161.28 300.00 0.05 0.11 -0.05 139.66 304.83 -165.16 325.00 0.11 0.12 -0.01 150.83 283.91 -133.07 350.00 0.16 0.14 0.02 162.89 262.99 -100.09 375.00 0.20 0.15 0.05 174.95 242.06 -67.11 400.00 0.25 0.17 0.09 187.01 221.14 -34.13 425.00 0.30 0.16 0.15 177.80 205.57 -27.77 450.00 0.36 0.14 0.22 167.51 192.33 -24.82 475.00 0.42 0.13 0.30 157.23 179.10 -21.87 500.00 0.48 0.11 0.37 146.94 165.86 -18.92 525.00 0.37 0.09 0.28 126.43 152.62 -26.19 550.00 0.26 0.08 0.19 106.08 139.38 -33.31 575.00 0.16 0.06 0.09 85.72 126.14 -40.43 600.00 0.05 0.05 0.00 65.36 112.91 -47.55 625.00 0.06 0.04 0.02 39.09 104.42 -65.33 650.00 0.08 0.05 0.03 12.87 97.87 -85.00 675.00 0.10 0.05 0.05 346.66 91.33 -104.67 700.00 0.12 0.06 0.06 319.98 84.78 -124.80 725.00 0.09 0.06 0.03 292.15 78.23 -146.09 750.00 0.07 0.06 0.01 264.31 71.69 -167.37 775.00 0.05 0.07 -0.02 236.48 65.14 171.34 800.00 0.02 0.07 -0.05 208.64 58.59 150.05 825.00 0.10 0.08 0.02 181.22 59.72 121.50 850.00 0.17 0.09 0.08 154.32 64.29 90.04 875.00 0.24 0.10 0.14 127.43 68.85 58.58 900.00 0.31 0.12 0.19 101.13 73.42 27.72 925.00 0.32 0.13 0.19 100.54 77.98 22.56 950.00 0.33 0.14 0.19 99.94 82.55 17.39 975.00 0.34 0.15 0.19 99.35 87.11 12.23 1000.00 0.35 0.16 0.19 98.24 91.68 6.56 1025.00 0.41 0.20 0.21 102.92 96.03 6.89 1050.00 0.47 0.26 0.21 107.61 100.24 7.37 1075.00 0.53 0.31 0.22 112.29 104.44 7.86 1100.00 0.59 0.36 0.23 116.73 108.64 8.09 1125.00 0.58 0.41 0.17 122.19 112.84 9.36 SURV-Q167(OPS SUR-MA-003) 19'h Nov 03/Rev 15 Page 4 of 12 AK0113GCM102 Survey QC - RGS-L. Specification Sheet 1150.00 0.57 0.46 0.11 127.66 117.04 10.62 1175.00 0.57 0.52 0.05 133.13 121.24 11.89 1200.00 0.56 0.57 -0.01 138.59 125.44 13.15 1225.00 0.60 0.57 0.04 139.18 128.11 11.07 1250.00 0.64 0.54 0.10 140.26 130.21 10.05 1275.00 0.69 0.52 0.16 141.33 132.31 9.03 1300.00 0.73 0.50 0.23 142.28 134.41 7.87 1325.00 0.67 0.48 0.19 142.96 136.50 6.45 1350.00 0.62 0.45 0.16 143.64 138.60 5.04 1375.00 0.56 0.43 0.13 144.32 140.70 3.62 1400.00 0.51 0.41 0.10 145.00 142.79 2.20 1425.00 0.44 0.40 0.03 141.08 141.77 -0.69 1450.00 0.36 0.40 -0.04 137.01 139.27 -2.26 1475.00 0.29 0.40 -0.11 132.94 136.78 -3.84 1500.00 0.22 0.41 -0.19 128.88 134.29 -5.41 1525.00 0.29 0.41 -0.12 127.82 131.79 -3.98 1550.00 0.36 0.41 -0.05 126.54 129.30 -2.77 1575.00 0.43 0.41 0.02 125.25 126.81 -1.55 1600.00 0.50 0.41 0.09 123.97 124.31 -0.34 1625.00 0.41 0.40 0.01 121.47 122.69 -1.22 1650.00 0.32 0.38 -0.06 118.79 121.46 -2.67 1675.00 0.23 0.36 -0.13 116.11 120.23 -4.12 1700.00 0.14 0.34 -0.20 113.37 119.00 -5.64 1725.00 0.15 0.32 -0.17 109.77 117.77 -8.01 1750.00 0.17 0.30 -0.13 106.16 116.54 -10.38 1775.00 0.19 0.28 -0.09 102.56 115.31 -12.75 1800.00 0.21 0.26 -0.06 98.96 114.08 -15.12 1825.00 0.21 0.26 -0.05 103.38 113.94 -10.56 1850.00 0.20 0.25 -0.05 107.81 114.56 -6.76 1875.00 0.20 0.25 -0.05 112.23 115.18 -2.95 1900.00 0.20 0.25 -0.05 116.66 115.80 0.85 1925.00 0.21 0.25 -0.03 114.01 116.42 -2.42 1950.00 0.23 0.24 -0.02 111.59 117.05 -5.46 1975.00 0.24 0.24 -0.00 109.16 117.67 -8.50 2000.00 0.25 0.24 0.01 107.20 118.29 -11.09 2025.00 0.23 0.22 0.01 107.28 118.35 -11.07 2050.00 0.21 0.20 0.01 107.35 118.11 -10.76 2075.00 0.20 0.18 0.02 107.42 117.88 -10.46 2100.00 0.18 0.15 0.02 107.50 117.65 -10.15 2125.00 0.15 0.13 0.02 103.61 117.41 -13.81 2150.00 0.12 0.11 0.01 99.48 117.18 -17.70 2175.00 0.09 0.09 0.00 95.35 116.95 -21.60 2200.00 0.06 0.06 -0.01 91.62 116.71 -25.10 2225.00 0.09 0.05 0.04 106.62 110.43 -3.81 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 5 of 12 AK0113GCM102 Survey QC - RGS-C1 _pecification Sheet gym/data 2250.00 0.12 0.05 0.07 121.63 102.18 19.45 2275.00 0.15 0.04 0.11 136.63 93.92 42.71 2300.00 0.19 0.04 0.15 151.65 85.67 65.98 2325.00 0.18 0.03 0.14 159.86 77.41 82.45 2350.00 0.17 0.03 0.14 168.08 69.16 98.92 2375.00 0.16 0.02 0.14 176.30 60.90 115.39 2400.00 0.15 0.02 0.13 184.51 52.65 131.86 2425.00 0.12 0.02 0.10 167.52 64.95 102.58 2450.00 0.10 0.02 0.08 150.29 85.39 64.90 2475.00 0.08 0.03 0.05 133.05 105.82 27.23 2500.00 0.05 0.03 0.02 115.81 126.26 -10.45 2525.00 0.08 0.04 0.04 138.33 146.70 -8.36 2550.00 0.11 0.04 0.06 161.10 167.14 -6.04 2575.00 0.13 0.05 0.09 183.87 187.58 -3.71 2600.00 0.16 0.05 0.11 206.64 208.01 -1.38 2625.00 0.18 0.05 0.12 198.84 213.73 -14.89 2650.00 0.19 0.06 0.14 190.38 212.58 -22.20 2675.00 0.21 0.06 0.15 181.93 211.43 -29.51 2700.00 0.23 0.06 0.17 173.47 210.28 -36.81 2725.00 0.23 0.06 0.17 169.47 209.13 -39.65 2750.00 0.24 0.06 0.18 165.43 207.98 -42.54 2775.00 0.24 0.06 0.18 161.39 206.83 -45.43 2800.00 0.25 0.06 0.19 157.35 205.68 -48.32 2825.00 0.66 0.37 0.30 175.35 209.08 -33.73 2850.00 1.08 0.77 0.31 193.20 213.77 -20.57 2875.00 1.50 1.18 0.32 211.05 218.47 -7.42 2900.00 1.92 1.59 0.33 228.91 223.17 5.74 2925.00 2.96 2.54 0.42 208.26 210.66 -2.40 2950.00 4.01 3.72 0.29 187.66 191.46 -3.80 2975.00 5.06 4.90 0.16 167.05 172.25 -5.20 3000.00 6.10 6.07 0.03 146.45 153.05 -6.60 3025.00 7.47 7.36 0.10 147.74 148.38 -0.64 3050.00 8.83 8.70 0.13 149.03 149.46 -0.43 3075.00 10.05 9.97 0.08 152.55 151.94 0.61 3100.00 11.34 11.25 0.09 155.48 155.02 0.46 3125.00 12.91 12.84 0.07 155.30 155.16 0.14 3150.00 14.17 14.13 0.04 153.63 153.86 -0.23 3175.00 14.14 14.12 0.02 149.17 149.62 -0.45 3200.00 13.33 13.33 -0.00 143.28 143.50 -0.22 3225.00 12.68 12.68 0.00 135.96 136.50 -0.55 3250.00 13.23 13.25 -0.02 128.36 128.36 0.01 3275.00 14.26 14.30 -0.04 125.56 125.51 0.05 3300.00 15.49 15.53 -0.04 125.69 125.57 0.12 3325.00 16.74 16.79 -0.05 124.90 124.79 0.11 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 6 of 12 AK0113GCM102 Survey QC - RGS-i.., Specification Sheet gliMidata 3350.00 17.59 17.66 -0.07 124.85 124.78 0.08 3375.00 18.51 18.54 -0.04 125.03 124.90 0.13 3400.00 19.05 19.12 -0.07 125.19 125.11 0.09 3425.00 19.87 19.93 -0.06 125.77 125.60 0.17 3450.00 20.43 20.49 -0.06 126.42 126.23 0.19 3475.00 21.13 21.19 -0.06 127.02 126.90 0.12 3500.00 21.76 21.84 -0.08 127.81 127.66 0.15 3525.00 22.20 22.27 -0.07 128.06 128.02 0.04 3550.00 22.82 22.89 -0.07 128.27 128.23 0.04 3575.00 23.48 23.56 -0.09 128.34 128.36 -0.02 3600.00 24.15 24.22 -0.07 128.35 128.41 -0.06 3625.00 24.71 24.78 -0.07 128.55 128.59 -0.04 3650.00 25.17 25.25 -0.08 128.61 128.64 -0.04 3675.00 25.83 25.91 -0.08 128.86 128.87 -0.01 3700.00 26.19 26.26 -0.08 129.49 129.42 0.06 3725.00 26.75 26.84 -0.08 129.56 129.58 -0.03 3750.00 27.36 27.44 -0.08 129.78 129.75 0.04 3775.00 27.64 27.73 -0.09 130.03 130.15 -0.12 3800.00 28.28 28.40 -0.11 130.38 130.44 -0.06 3825.00 28.72 28.83 -0.11 130.40 130.45 -0.05 3850.00 29.32 29.43 -0.11 130.55 130.56 -0.01 3875.00 29.91 29.99 -0.09 130.77 130.80 -0.03 3900.00 30.18 30.27 -0.09 130.86 130.91 -0.05 3925.00 30.65 30.74 -0.09 131.03 131.04 -0.01 3950.00 31.07 31.18 -0.10 131.08 131.18 -0.10 3975.00 31.47 31.55 -0.08 131.44 131.48 -0.05 4000.00 31.90 31.97 -0.07 131.47 131.53 -0.06 14025.00 32.56 32.64 -0.07 131.62 131.71 -0.09 4050.00 33.22 33.28 -0.06 131.93 131.95 -0.02 4075.00 33.88 33.95 -0.07 132.17 132.21 -0.04 4100.00 34.38 34.45 -0.07 132.50 132.54 -0.03 4125.00 34.85 34.93 -0.08 132.94 132.92 0.02 4150.00 35.42 35.51 -0.09 133.01 133.07 -0.06 4175.00 36.12 36.21 -0.09 133.20 133.28 -0.07 4200.00 36.46 36.53 -0.08 133.31 133.39 -0.08 4225.00 37.10 37.18 -0.09 133.75 133.72 0.03 4250.00 36.90 36.99 -0.09 133.81 133.90 -0.10 4275.00 37.05 37.14 -0.09 133.75 133.91 -0.16 4300.00 36.99 37.08 -0.09 133.82 133.90 -0.07 4325.00 36.74 36.83 -0.09 133.67 133.82 -0.14 4350.00 36.69 36.78 -0.08 133.71 133.76 -0.04 4375.00 36.77 36.84 -0.08 133.74 133.79 -0.06 4400.00 36.77 36.86 -0.09 133.77 133.84 -0.06 4425.00 37.02 37.10 -0.09 133.79 133.80 -0.01 SURV-Q167(OPS SUR-MA-003) 19"Nov 03/Rev 15 Page 7 of 12 AK0113GCM102 Survey QC - RGS-C. _pecification Sheet gir /data 4450.00 36.93 37.00 -0.07 133.68 133.72 -0.04 4475.00 37.36 37.42 -0.06 133.88 133.85 0.03 4500.00 37.07 37.16 -0.09 133.72 133.79 -0.08 4525.00 37.26 37.34 -0.08 133.66 133.75 -0.10 4550.00 37.33 37.41 -0.08 133.65 133.76 -0.11 4575.00 37.38 37.46 -0.08 133.68 133.74 -0.05 4600.00 37.60 37.67 -0.07 133.62 133.63 -0.01 4625.00 37.45 37.52 -0.07 133.66 133.65 0.01 4650.00 37.34 37.41 -0.06 133.53 133.70 -0.17 4675.00 37.60 37.69 -0.08 133.65 133.66 -0.01 4700.00 37.64 37.71 -0.07 133.60 133.72 -0.12 4725.00 37.71 37.78 -0.07 133.67 133.77 -0.10 4750.00 37.61 37.70 -0.09 133.72 133.80 -0.08 4775.00 37.91 37.96 -0.05 133.60 133.79 -0.20 4800.00 38.14 38.23 -0.09 133.77 133.87 -0.10 4825.00 38.04 38.12 -0.08 133.89 133.93 -0.04 4850.00 37.91 37.95 -0.04 133.93 133.94 -0.01 4875.00 38.24 38.32 -0.09 133.91 134.00 -0.09 4900.00 38.21 38.23 -0.02 133.98 133.92 0.06 4925.00 38.27 38.36 -0.09 134.06 134.11 -0.05 4950.00 38.47 38.52 -0.05 134.17 134.25 -0.08 4975.00 38.52 38.58 -0.06 134.35 134.41 -0.06 5000.00 39.00 39.06 -0.06 134.65 134.70 -0.05 5025.00 39.12 39.19 -0.07 134.82 134.88 -0.06 5050.00 39.31 39.34 -0.03 134.94 134.95 -0.00 5075.00 39.44 39.47 -0.03 134.88 134.87 0.01 5100.00 39.40 39.44 -0.04 134.64 134.69 -0.05 5125.00 39.53 39.48 0.04 134.69 134.83 -0.15 5150.00 39.78 39.79 -0.01 134.71 134.87 -0.16 5175.00 39.61 39.61 -0.00 134.84 134.97 -0.12 5200.00 39.93 39.96 -0.03 135.02 135.06 -0.04 5225.00 39.78 39.80 -0.03 135.10 135.19 -0.09 5250.00 39.99 40.02 -0.03 135.41 135.42 -0.00 5275.00 40.23 40.27 -0.04 135.39 135.45 -0.06 5300.00 40.41 40.43 -0.02 135.60 135.73 -0.13 5325.00 40.66 40.69 -0.03 135.67 135.74 -0.08 5350.00 41.01 41.00 0.00 135.77 135.87 -0.10 5375.00 41.21 41.22 -0.01 135.87 135.92 -0.04 5400.00 41.30 41.31 -0.00 135.93 135.92 0.02 5425.00 41.28 41.29 -0.01 136.10 136.12 -0.02 5450.00 41.51 41.53 -0.02 136.18 136.23 -0.04 5475.00 41.82 41.84 -0.02 136.20 136.20 0.00 5500.00 42.18 42.20 -0.02 136.30 136.28 0.02 5525.00 42.29 42.33 -0.04 136.42 136.40 0.01 SURV-Q167(OPS SUR-MA-003) 19"Nov 03/Rev 15 Page 8 of 12 AK0113GCM102 Survey QC - RGS-C. . pecification Sheet gyro/data 5550.00 42.37 42.35 0.01 136.47 136.45 0.02 5575.00 42.52 42.54 -0.02 136.53 136.60 -0.06 5600.00 43.16 43.20 -0.04 136.57 136.60 -0.04 5625.00 43.04 43.10 -0.06 136.68 136.69 -0.01 5650.00 42.88 42.87 0.01 136.69 136.79 -0.10 5675.00 43.55 43.64 -0.08 136.50 136.47 0.03 5700.00 42.84 42.90 -0.06 136.67 136.66 0.01 5725.00 43.51 43.53 -0.02 136.53 136.59 -0.06 5750.00 43.91 43.91 0.00 136.58 136.58 -0.01 5775.00 43.79 43.78 0.01 136.62 136.68 -0.06 5800.00 43.50 43.51 -0.00 136.60 136.65 -0.05 5825.00 43.30 43.32 -0.03 136.75 136.74 0.01 5850.00 43.27 43.32 -0.05 136.79 136.80 -0.01 5875.00 43.33 43.40 -0.07 136.84 136.87 -0.03 5900.00 43.41 43.44 -0.03 137.08 137.05 0.04 5925.00 43.78 43.81 -0.04 137.41 137.44 -0.03 5950.00 43.37 43.38 -0.02 137.49 137.57 -0.09 5975.00 43.61 43.63 -0.02 137.46 137.46 -0.00 6000.00 43.44 43.50 -0.06 137.55 137.57 -0.02 6025.00 43.53 43.56 -0.02 137.59 137.61 -0.01 6050.00 43.70 43.73 -0.03 137.55 137.59 -0.04 6075.00 43.42 43.48 -0.05 137.61 137.62 -0.02 6100.00 43.47 43.49 -0.02 137.72 137.71 0.01 6125.00 43.49 43.57 -0.08 137.81 137.85 -0.04 6150.00 43.21 43.26 -0.05 137.96 137.95 0.01 6175.00 43.24 43.29 -0.05 138.09 138.05 0.04 6200.00 43.45 43.44 0.01 138.25 138.19 0.06 6225.00 43.38 43.41 -0.03 138.24 138.28 -0.04 6250.00 43.28 43.32 -0.04 138.42 138.38 0.05 6275.00 42.76 42.72 0.04 138.49 138.49 -0.00 6300.00 42.70 42.74 -0.04 138.53 138.53 -0.00 6325.00 42.52 42.55 -0.03 138.53 138.57 -0.04 6350.00 42.56 42.57 -0.00 138.80 138.77 0.03 6375.00 42.34 42.43 -0.09 138.85 138.78 0.07 6400.00 42.25 42.26 -0.01 139.02 138.97 0.06 6425.00 42.39 42.41 -0.02 139.27 139.29 -0.03 6450.00 42.15 42.18 -0.03 139.44 139.45 -0.00 6475.00 42.30 42.27 0.03 139.61 139.62 -0.01 6500.00 42.16 42.15 0.01 139.72 139.68 0.03 6525.00 41.99 41.96 0.04 139.88 139.88 -0.01 6550.00 41.81 41.82 -0.01 139.78 139.86 -0.08 6575.00 41.53 41.51 0.02 139.83 139.86 -0.02 6600.00 41.49 41.49 -0.00 139.79 139.83 -0.03 6625.00 41.37 41.36 0.01 139.82 139.78 0.04 6650.00 41.25 41.19 0.06 139.73 139.70 0.03 SURV-Q167(OPS SUR-MA-003) 19'h Nov 03/Rev 15 Page 9 of 12 AK0113GCM102 Survey QC - RGS-C. Jpecification Sheet gYM/cab . 6675.00 40.95 40.95 -0.01 139.63 139.64 -0.01 6700.00 40.73 40.76 -0.03 139.73 139.69 0.03 6725.00 40.49 40.51 -0.02 139.79 139.79 -0.00 6750.00 40.51 40.54 -0.03 139.89 139.92 -0.03 6775.00 40.09 40.02 0.06 139.95 139.93 0.02 6800.00 39.89 39.89 0.00 140.15 140.11 0.05 6825.00 40.08 40.13 -0.05 140.22 140.26 -0.03 6850.00 39.95 39.88 0.07 140.24 140.23 0.00 6875.00 39.74 39.77 -0.03 140.23 140.17 0.06 6900.00 39.23 39.21 0.02 140.34 140.35 -0.01 6925.00 39.57 39.57 0.01 140.33 140.34 -0.01 6950.00 39.14 39.22 -0.08 140.49 140.40 0.09 6975.00 39.53 39.49 0.03 140.52 140.46 0.06 7000.00 39.43 39.52 -0.09 140.65 140.62 0.03 7025.00 39.00 38.99 0.01 140.64 140.64 0.00 7050.00 38.86 38.85 0.00 140.65 140.62 0.04 7075.00 38.43 38.44 -0.01 140.61 140.63 -0.03 7100.00 38.39 38.45 -0.06 140.70 140.65 0.05 7125.00 38.58 38.64 -0.06 140.65 140.61 0.04 7150.00 38.03 38.09 -0.06 140.72 140.74 -0.02 7175.00 38.00 38.08 -0.08 140.79 140.86 -0.08 7200.00 37.88 37.90 -0.02 140.81 140.78 0.03 7225.00 37.79 37.82 -0.03 140.78 140.78 -0.00 7250.00 37.58 37.59 -0.02 140.78 140.75 0.03 7275.00 37.79 37.82 -0.03 140.69 140.69 0.00 7300.00 37.70 37.68 0.02 140.63 140.64 -0.02 7325.00 37.74 37.77 -0.04 140.66 140.66 -0.00 1 7350.00 37.62 37.61 0.02 140.66 140.61 0.05 7375.00 37.56 37.59 -0.03 140.65 140.64 0.01 7400.00 37.63 37.68 -0.05 140.70 140.71 -0.01 7425.00 37.75 37.79 -0.04 140.69 140.80 -0.10 7450.00 37.67 37.65 0.02 140.90 140.81 0.09 7475.00 37.39 37.38 0.01 140.75 140.76 -0.02 1 7500.00 37.40 37.41 -0.01 140.77 140.88 -0.11 7525.00 37.48 37.49 -0.01 140.81 140.83 -0.02 7550.00 37.60 37.60 0.01 140.92 140.89 0.02 7575.00 37.66 37.69 -0.03 140.88 140.94 -0.06 7600.00 37.45 37.46 -0.01 141.00 140.90 0.11 7625.00 37.54 37.57 -0.03 141.17 141.23 -0.06 7650.00 37.52 37.56 -0.04 141.03 141.03 -0.00 7675.00 37.57 37.54 0.03 141.26 141.14 0.12 7700.00 37.36 37.39 -0.03 141.18 141.16 0.02 7725.00 37.34 37.39 -0.05 141.20 141.15 0.04 7750.00 37.36 37.41 -0.04 141.22 141.32 -0.10 SURV-Q167(OPS SUR-MA-003) 19°Nov 03/Rev 15 Page 10 of 12 AK0113GCM102 Survey QC - RGS-C t ,pecification Sheet gyroldata 7775.00 37.33 37.34 -0.01 141.26 141.25 0.01 7800.00 37.41 37.44 -0.03 141.49 141.50 -0.01 7825.00 37.36 37.41 -0.06 141.64 141.72 -0.08 7850.00 37.36 37.35 0.01 141.53 141.63 -0.10 7875.00 37.36 37.39 -0.03 141.81 141.91 -0.11 7900.00 36.97 37.06 -0.08 142.05 142.01 0.04 7925.00 36.93 36.97 -0.04 141.99 141.97 0.02 7950.00 36.86 36.89 -0.04 142.21 142.22 -0.01 7975.00 36.78 36.80 -0.02 142.21 142.15 0.06 8000.00 36.76 36.73 0.03 142.23 142.14 0.09 8025.00 36.70 36.77 -0.07 142.19 142.24 -0.04 8050.00 36.52 36.56 -0.04 142.23 142.22 0.01 8075.00 36.69 36.73 -0.04 142.56 142.55 0.01 8100.00 36.51 36.56 -0.05 142.43 142.44 -0.00 8125.00 36.38 36.37 0.01 142.35 142.40 -0.06 8150.00 36.37 36.38 -0.01 142.74 142.64 0.10 8175.00 36.37 36.37 -0.00 142.87 142.77 0.10 8200.00 36.21 36.23 -0.02 142.84 142.80 0.04 8225.00 36.13 36.14 -0.01 142.81 142.74 0.06 8250.00 36.15 36.15 0.00 142.83 142.79 0.04 8275.00 36.22 36.23 -0.02 142.93 142.94 -0.01 8300.00 36.10 36.10 0.00 142.87 142.87 -0.00 8325.00 36.19 36.20 -0.01 142.90 142.94 -0.04 8350.00 36.00 35.91 0.09 142.80 142.77 0.03 8375.00 35.71 35.75 -0.04 142.74 142.76 -0.02 8400.00 35.84 35.86 -0.02 142.87 142.87 0.01 8425.00 35.67 35.70 -0.04 142.86 142.85 0.01 8450.00 35.67 35.67 0.01 143.00 143.01 -0.01 8475.00 35.62 35.64 -0.02 142.89 142.84 0.05 8500.00 36.16 36.24 -0.09 141.96 141.82 0.14 8525.00 36.40 36.40 -0.00 140.46 140.34 0.11 8550.00 36.03 36.03 -0.00 137.74 137.54 0.20 8575.00 35.83 35.83 0.00 134.69 134.39 0.30 8600.00 35.89 35.94 -0.05 132.06 131.94 0.12 8625.00 35.75 35.81 -0.06 130.75 130.71 0.05 8650.00 35.80 35.87 -0.07 130.40 130.40 0.00 8675.00 35.84 35.87 -0.03 129.99 129.91 0.08 8700.00 35.25 35.23 0.02 127.62 127.32 0.30 8725.00 34.55 34.57 -0.03 124.13 123.85 0.27 8750.00 34.20 34.24 -0.04 121.85 121.78 0.07 8775.00 34.20 34.27 -0.07 121.16 121.18 -0.02 8800.00 34.22 34.27 -0.04 120.96 120.87 0.08 8825.00 34.01 34.04 -0.04 120.69 120.70 -0.00 8850.00 34.01 34.07 -0.06 120.65 120.62 0.03 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 11 of 12 AK0113GCM102 Survey QC - RGS-C. specification Sheet gyro/data 8875.00 33.73 33.76 -0.03 120.61 120.51 0.10 8900.00 32.24 32.14 0.10 120.90 120.83 0.07 8925.00 30.12 30.09 0.03 121.02 121.11 -0.08 8950.00 29.45 29.49 -0.04 121.10 121.08 0.03 8975.00 29.35 29.38 -0.03 120.96 120.94 0.02 9000.00 29.13 29.15 -0.03 120.94 120.90 0.04 9025.00 28.78 28.78 -0.01 120.57 120.58 -0.00 9050.00 28.16 28.19 -0.02 120.19 120.18 0.01 9075.00 27.64 27.66 -0.02 119.80 119.94 -0.13 9100.00 27.36 27.39 -0.04 119.60 119.63 -0.04 9125.00 26.89 26.92 -0.03 119.50 119.48 0.02 9150.00 26.54 26.57 -0.03 119.34 119.24 0.10 9175.00 27.41 27.52 -0.11 119.25 119.29 -0.04 9200.00 28.90 29.00 -0.10 119.46 119.51 -0.05 9225.00 29.19 29.25 -0.05 119.55 119.61 -0.06 9250.00 28.91 28.98 -0.07 119.39 119.35 0.03 9275.00 28.74 28.80 -0.05 119.19 119.16 0.02 9300.00 28.28 28.34 -0.06 119.09 119.08 0.01 9325.00 27.85 27.89 -0.04 118.78 118.79 -0.01 9350.00 28.12 28.19 -0.07 118.57 118.57 0.00 9375.00 29.99 30.07 -0.08 118.93 118.91 0.02 9400.00 31.36 31.42 -0.06 119.56 119.46 0.10 9425.00 31.67 31.72 -0.04 119.86 119.79 0.07 9450.00 31.38 31.40 -0.02 119.74 119.66 0.08 9475.00 31.22 31.25 -0.03 119.76 119.68 0.08 9500.00 31.04 31.07 -0.03 119.54 119.53 0.01 9525.00 30.78 30.79 -0.02 119.59 119.55 0.04 9550.00 30.98 31.01 -0.03 120.54 120.48 0.06 9575.00 31.29 31.30 -0.01 121.54 121.48 0.06 9600.00 31.09 31.10 -0.00 121.48 121.45 0.03 9625.00 30.28 30.31 -0.03 121.73 121.68 0.05 9650.00 30.19 30.20 -0.01 121.44 121.48 -0.05 9675.00 30.28 30.32 -0.04 121.44 121.60 -0.16 Average -0.0004 -0.0027 Standard Deviation 0.0900 0.0731 Tolerance for both the Average and the Standard Casing 0.3° Casing 0.5° Deviation Drillpipe 0.3° Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV-Q167(OPS SUR-MA-003) 19''Nov 03/Rev 15 Page 12 of 12 AK0113GCM102 Survey QC - RGS-Ci Hnalysis Sheet gyro/data SURVEY QUALITY CONTROL- DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 10.00 Azimuth reference: Grid/True North TRUE NORTH _ Vertical reference: RKB/MSL/Other RKB If other give details TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northings 0.00 Eastings 0.00 Latitude 70.2693 Az. Ref: Grid/True True Grid Corrected Y/N? N Description CALIBRATION Tool Number F0077 I Calibration Date 02 Aug 2012 OPERATING TEMPERATURE Calibration range From 49.84 To 119.34 Gyro operating range From 72.73 To 85.26 I Spec'-Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When not possible input roll test data performed after return to base) Cal value Pre job offset Post job offset Abs dif.cal.post Abs dif.pre.post Spec' Accel Scale 0.000055 -0.000333 0.000000 N/A N/A Cal/Post- 0.00015 Mass Unbalance 3.35 0.56 0.00 N/A N/A Pre/Post-0.4°/hr INITIALISATION Depth (Approx) 3060.09 No of stns 6 Spec'- Min No. - 6 Azimuth Mean 148.99 Std deviation 0.07 Spec'-Azi SD 0.2° Inclination Mean 9.39 Std deviation 0.00 Spec'- Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas-theor)) 0.09 Std deviation 0.01 Spec'- See Q167 DRIFT TUNE Residual x gyro bias Mean 0.001 Std dev' 0.009 _ Spec's- Mean and SD - 0.333°/hr Residual y gyro bias Mean -0.000 Std dev' 0.004 Spec's- Mean and SD - 0.333°/hr TOOLFACE RATE Maximum toolface rate 1282.87 Spec'-400°/sec J IN/OUT COMPARISON (AZI' N/A IF INC' <15° Inclination Difference Mean -0.00 Std dev' _0.09 Spec's- Casing 0.3°/Drill pipe 0.3° _ Azimuth Difference Mean -0.00 Std dev' 0.07 Spec's- Casing 0.5°/Drill pipe 0.75° Lateral Divergence/1000 0.08 Spec- 5.0/1000 Vertical Divergence/1000 0.23 Spec'- 2.0/1000 DEPTH CONTROL Wireline Company Schlumberger Line type .39 Encoder SF Schlumberger Max Depth (TD) 9675 CCL Corrected NO Zero Depth (Rig up) RKB @ 47.84 ft _ Rezero Depth -7 Given pup joint depth NA Measured P1 _ NA Strech cor. At TD divided by TD/1000 .698 Spec'- 1.5/1000 Dif. Between rigup and rezero depths divided by TD/1000 .7291 Spec'- 2.0/1000 Dif. Between given and meas depth divided by meas/1000 NA Spec'- 2.0/1000 SURV-Q165(OPS SUR-MA-010)22nd Jan 2004/Revision 20 Page 1 of 1 AK0113GCM102 Survey QC - RGS-CT Acceptance Sheet gym/daft FIELD AND SURVEY INFORMATION Operator BP (EXPLORATION)ALASKA INC. Field/ Platform PARKER 273 Well Number PRUDHOE BAY DRILLSITE: 2 WELL: 2-12D Survey section From 0.00 ft. to 9675.00 ft. Date 1/13/2013 Gyrodata Job No AK0113GCM102 Gyrodata Surveyors Edwin Hardon, Henry Drew Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey'Hot'section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q166(OPS SUR-MA-003)13'Nov 03/Revision 12 Page 1 of 1 AK0113GCM102 RECEIVED FEB 0 8 2013 Schlumberger AOGC Drilling & Measurements MWD/LWD Log Product Delivery Customer BP Exploration(Alaskallnc. Dispatched To: Christine Shartzer(ADGCC) Well No 02-12D Date Dispatched: 4-Feb-13 Installation/Rig Parker 273 Dispatched By: I.Carmichael Data No Of Prints No of CDs Surveys 2 1 � �f Please sign and return to:Analisa Steger Received By: A1 BP Exploration(Alaska)Inc. Petrotechnical Data Center(LR2-1) 900 E.Benson Blvd. Anchorage,Alaska 99508 Fax:907-564-4005 e-mail address:analisa.steger@bp.com LWD Log Delivery V1.0,01/22/2010 RECEIVED FEB 082013 1 ° 4 AOGCC Schlumberger Drilling&Measurements MWD/LWD Log Product Delivery Customer BP Exploration(Alaska)Inc. Dispatched To: Christine Shartzer(AOGCC) Well No 02-12D Date Dispatched: 4-Feb-13 Installation/Rig Parker 273 Dispatched By: I.Carmichael Data No Of Prints No of CDs Surveys 2 1 diAt; Please sign and return to: Anaiisa steger Received By: ` BP Exploration(Alaska)Inc. Petrotechnical Data Center(LR2-1) 900 E.Benson Blvd. Anchorage,Alaska 99508 Fax:907-564-4005 e-mail address:analisa.steger@bp.com LWD Log Delivery V1.0,01/22/2010 co a° 2228A Mmneu2 82oumi(e(yy t=u-,cI0�p cri pipit it nomN°' oeMmm §5111 o LU r ,,,,O, mnmeN NNOeN Ne-N-0 OWTW� °m mmmm2 aDm AO�D � yyO eeQvv vvevv eee 8, t7t7N c.)mmmm mc,mgc, � eeQee e�ey fey fey fey 22222 ey fey fey fey fey 22222 Qy�Oy�QyQ a 22222 Qy CJ I��y]�My�CyJ �y �y�y �y �y�y �y�y �y�y M \ . 222222 22222 2(0222 22222 2222(9 22222 22222 22%22 V ° vQQev vveee eeeee eQQQe aeeee eeeaQ Qovve •vicecQ d O wmaccom mmmmcc mmecmm mmmmm mto Comm mtpmmcc cummmao aimmmm CV eeQeQ ___ pepp.Q.eee _v._ eeeee eevee Qvvve eeeee 2 W 9e00pA_N M_WANg 60mmr " mpNe t(pppp Op p'prN MA�n� „NNO Ne 6222 N ((�� ((yy ((�y(�(p� Wen pW pm pm pm pU Ormpmp pN§ ' ,:i�n C') NO O O r M t7 M i M th i 1 2-2- g,) 6i6.32- 2-555§ g g c f7 f�f (�f7?t7 c2'J N§§N N N 52581 M m Zo 66666 hi {rnp{rnp {rnp{°p�p �prn m rn�rnpm m rnmm m rn mrnrnrnrn m M J N N N N N N N N N N N N,,ANN N N N N N N N N N N N N N N N .00000 N N N N N N N N N G G p G 0 66666 0 0 6 r r 66666 n 0 C n e 66666 O On On On On 66666 ((N W a Z p0 n q8mrn.- ,-a.-0 , cm mcom �,- .-` oe, soc h aln ,- inmrm tcoo . $ ranm N , S uivico6 r.:p.:o6c6c6 00660 66666 2IIZI IMSIS SISSI IIII IOSIS SIIIm mcDmSI 2222 W rnnnn rnnn nrrrr rrrrrrrnrr nrrrrnrrrr rrrrr 22222 22282 88222 28888 82828 22222 22222 22288 V _,...' WNNmn ,Ryp N fOrerOr7ie�m NryN� 4!0.4.0J0 m0r0 ° „,4,w.4 .-4,..,4,,, C NNe t7ww rO�N7 ...?,r. mm Omme 'PL.0 960yMMMMMMomm'6`6°6'°R 60OiOiT OiOiT 6Mp6omWWp227r=r°AA mmcmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmm mm" SSEES SESEE SEHS SES§§ SESSE ESSES 2ESSE SESES N2NN 22222 222..N N N N 0. 22222 02222 2222S 22222 2 2 2 2 2 J=a800m0000 00N ON00 (00000 000 ^Ooo 0 p10mN 08ZGpNG O0G00GC 000CC CCGGG G0GO0 00N0 0000 Cm OD pp p TERSE m ((���tpp((�.�((�.� �p Cm 303 wc88000 900000 000.N7 228[7 10Or0n0 NM°ary V<M22 <8°0tr0 GCp00 O O O O O CCC,,N (h N1<Q 0 00000 FFIII r r r m r 0,.-1.)10r E 2 8 8 8p m r n e m n p�r :22 4 n n O N pp 'c:-,:;22:: Q m m N m r = O O p 0 N N O m r n m m 6 m M 2 N m n m O IO N Q e m 8 0( e e 8 m N 66‘,S6.6 OO4'O t? 00O fV tM tM« O<1n N m L :" (0l00( cd'-4a52 Q C 6l N N COD g, ?^ O N O m m 0 d ddOm 00pp0 N0p08 28288 N ��1O QA00n N0(00a O0tp0A ANmN e F ml- N O 00O0CC G .- of iVNmr hnmmm 0666Oi oOi0" NN0m CNI Uo 02 ECN 77 0 '0 ‘0 n 6 $0 Er cc pi. mo Z.N 0° o Tia 0 a fop S N 6 N e 2 Z N= C §00 OD O 1�O tMD 61 2'9 O o m N :GKncQi Pv vrim-10imf oR; pp p a a (p N Q8 8 0 0 :728E2 00e m8 0 2 01.0 00000 00002 1 2P't1 02202 4 O666O 00.x.- .-NNme 1nm1�lA0G 6 6060 OOGG� .-oi�N NNthtm70 m r 0 Q 0 t - Z W a O O 0' V 2~ K 5 ° e:-- f v^d .. E 1 > ° t ° c V E Om dw'iv,o, ° .o g N 6 n 0 12 >. 'N ° CCddCC ° C ° , Wv00ppON NOM0qpARN 2827(0 12040 2m7-NO NrANM mLL °bRim 000 OOOG0 O M0nmG rmm mm00D0CG,. NNyy V OttEepC Wf9 > N7M 0 ( Cl G °CQEo 2— u ` Aucuyc t d y d* CKv5Uf1w'480U 20 teooi a r.. aCveu d >tvi N>> f f H H f G f Z( f 3 w - °.=82222 88888 8888 882SSRRrnrn$ Sri,-,6.6-ti 13,-, ,-,13,-, ,-, P.422t6 2nR4arn ~ Oopp p0popp66666 6666R ct001 Q N . N0 n00 Na0sa ApWp66 66666 NNSNNyNN NNNm777f N 0 N q2 8 8 2- N NNN N N N N O.O O O O00000 O O0O0OO OON O Ocpp Oq O.- 00.n 0M 0 m2MNAvAAAAAAAA AAAAA AAAAA AAAAAQAAnNr O 'A-Nm0 000 m0 N2,mr0 SAW6N W r (- N NNNNN N NNN N N N N M 0 LL Q N (0 p ,-NV,-W1.0,-WWW �7 r=m. O° 000ONi 2 mcoulow ol(clo c0 N N O Yl r Nf7fm°ON,m7 Q v Nle 1°fOOA� O N ~ 000 V '-'"°°O'- 288" "`;" 8' 8 r"°'* 5tVvvvv M °) "7188" t°m 0 m Q o e m 10 10 NNa EN� C Nom m q 2 N0 =d W Or w m 2.'41 V C m A 0 sN8N- V. 0 0 (0100008,c," , 00082 ,pN0N 0 7 m- v 7p C MQN NNNoO0 0V C .c, O NTN 0GOOO 00000 oCCCO COCOO CCCCO OoOCC OC-em ntoO M m O N N o Q i°0 J 9 0 c.N A:1 =A N O m W m po <r N 6 -,m e 0 0 N 0-moi N Z Z Z.o O 82.p8pp8p p8p8 p0p88 8§888 pq 1pq 888 00�Ip0 ppp00R 00100-0 08 p0 1p00000 1p1p 81.. .0000 10p8p0888 ""8 N "88180 82008 21781°10 1�§§01° N 1701( 8 "8°" Npp1p°p"5 E y r NN NNNNN NNNNC t7Mf7 NN 0 ° 0 0CO LL'y Q CO u cCD W are C'f 2 C W 6 u N +r �O O N Z C U ,�l0 ui N E wE 7a c °li n Ta °1J f7U al U0 O 7 O T TQ O O O C q d d h O) g.�9 �- e°� Z Lr oma E -�-'wz c 6'U1�0;f'°Q0(%JIUJJU(� 0 cL1 0 AO00o ' rOOVrDO Mm07Ng_W N0$ 2E2E 2 _E EOMW � .14 2:-.222aa N N Na0Ma'aOA , NM OMOO Omm2g dmao 017 070707 �� �8 888$8 $$$$ R8 NP.! �^mA 3 aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa 444aa aaaaa d tD aG co aD aD GG ad aD tb GGG aD O G ap co Gad OOtb G G 05 cd GGO co aD GOG co GG aD O OOO co O aD OOOO 8mm m t0 co mm co co aaaaa 44444 aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa 44444 aaaaa aaaaa 2 rr r r r r r r r r r r r r r r r Or r r rr OD.arr r r r r r r , r r r r r r r r r r r r r Cl. cl- .r ' yoWS AAW.- 0 MM.-NO,-.n. NNOWmNNONWWMNp4MNWMMVO0Mg0MhNWAOMMmN N NN EilEi 0 ,. 8g2Nn ( 0D -g32 NANNN � Tass sass 8088 pcoao00000 8AAlir NO! it gi4y � VTD 80 .q2M�p ' M0JOpNpNNNNNNNNNNNNNNN 0ONpNNOOO OO OD pNNNNNNNNNNNN fVNNN NNNN NNNNN NNNNN NNNO00000 0000^ OOOOO OOOOO 000A NNOO N0000 A000 00000 OOOOONNGGNGOOO NNAN A cn NNANN NANNNNANN NNNNNNN ANNAN ANNAN Cl"NNNN ap m p p�y WWW,-. p p q ppP p �tyy4720052 N C N O N 'O A t0 0 0 t0 N 0 0 O n W A 0 N 7 m E m A0 0 M®C .-0 a M 0 c7 fh 0 0 OA E 0 N$tA0 aD O0i O N Q N A 0 aD 1n C a Ah-000-WON Oa Na^T y tp pp S 0 { yt-p Qp p p IR AN N n A NNA n 1. {�nngsg rZr erZ mItm0ao, aMo SP -7z nP2NwN nnN N n W„o1 Om8ma8o 0a0mao ao wmm m_m_ 88888 88882 22888 82228 28888 88888 88888 88228 22 0000 00000 000 C M V VA0MaDONlh rMV 44 . gclN0N ar. l .-0044M n .-00044 -Omn t0OA c7O r...gcou? Ot00Nel ON0icclmoc0tp0N aD 4 .—.00V OV.-1.13 pNWAP 77 NNpN � 0O0N00t0hh NNNNNNNNN0 0000 0 ^002pAN1O z $$$$$ $$$$$ mmm0000000SSSSESSSSSSEESS $$SSS SSSS000SSSggg88gg 000A N .% NSNNON NNNNN ONSSM SO $$$N0 E�� Nh D0InNo JE MMVW OM0aa0 NaVWh c$00N Oh0N< NDAVM Om ?ti $^OA-V 0pMAn ENONM :1 MN rNN0$ a0 t.i40t 44 )thM cthN N N .-c V(V f V f V c V (V c V '-c V Cl Cl N N N N N N N.-N O C O-O O 666,-.- OOOOO NN ( .TA :228:2M :288714 C75481'.--PI tO 8.%'N0 g8:=4.8 0�R0 a282N EF.2 00ZE NV000R� 0tEEE ntDE."20 R N N Ca M O CN tNE n 0MVN N M V M t O n MmRNNNA.NNNNNSM mam mCVR CVCnVCVVO ,,uV _ COM0C9 W 1n 0(00 4R CtAO� 4EA0N ARNNa MNOnP Wpm V N�NtAON OMl,Wa00R AOMOA OAAOM AO<mN p p.m t�pp ap.ttpp.p. Inn tpD q p (y�y Q. I(n.fp. ttpp 6.16;2N O' tO T n n W O S`0 O O C.-N M M O D E tOD n W aD Of N N NNN N fV N 0 lV t'9 C�t�)t`9 t7 t7 W M M M O RRC 4 1.1.1”N W< r r r r r r . . r . r r r r r r r r r r r . r r r r r . . . r r r r r r r r r r r r r Q N O 0 C 00n W 22c%22 0aAON 224r W 4 8020 R4'2N,7, OrOA � NNOC� nOmOr p-AmM a 0Tm0 A V OAAiO AM V A - c " onNMv RoIgi aEt ' o'- ni "4qMA2 M "`' "2" Nggg1 Am "`7;2 NNNNN NNNN MvWWW oAONU N O p pp pp y N p Lt g22{ ONaV 242°.24-7, t0010� 00'ANON Mtn482 a V W M0 0 W rP0 ct-, rA Nmmm1� nAAMOmi ON V tNDO O Q 222; C�D t`M O) N f7 p tD a7 a A th N N A N O r 0 tD r O�N 0 tpDf Of o pp ty pui a M E t00 r._>2;W A g C N R M? D n m O t 0 0 N V 1Nn W A m f Ti.- N M y 0({yp A ppp S E n a D t y t G fn 7J a G fp r t0 W O N 009 1 n t0D tO T N< NNNN N N NNN M M M t'9 t h M M a a a 4 a a a$N 1 n 0 t n 1 n t n WOWED. t D t D A A A Q 0 w •C C AAT WC 082$mpp $g.Ap0p8 ONi2X NmN a 0NNRP1 hV<IG r."22p 000Op$' Mn tKVMN��� �NNM0D M 7R< $O Aaq pNV $EmmO 0 typ ( AM{ $ % § pyn 60606 mWW M RNNNnNNap NNI MhM MM00 eeaa E0E Ei202 tA0 t0D,h n 0 L U J ((t��� ap(� p� 1n p(��n tpp� AMA pp99 p tpp41n p a` r.:;.7204 ryf0 W O OE W yO MEm In In InN In iD0t00 f00� ,„ Gt�N C�Of M 0Of 000 1000�M In A 01N NNNt7M MMM.-Ma MMMNM MMA A M4AAA MMMMM MMMMM MMMC C 7C9MM MMMaa aaaRR RRRaa aaaaa 44444 NE AEtDNE W000h MO>C®O NMANO 2N002 $224.2 822.'2'4 GZ.i. n x'4822 t 00(AntO 22(724 84�� '.2 ac m mmOMmm cov ;MM MMMMMMM < VVRRRRRRRR<C Cm A' MM MM MR 2L MNON4NC .-MOON0miCC000nAWNM •-NNm •-ON •-•-N�NNNOE Ao NAOM toNOWO o0MOcasas 0INA m O. '<R NNNNN NNNNN NNNN NNNNN NNNCCo( CoC MMMMM $$$$9$ gl(MAIM W t•M9 MMMMM M MCM9MM E N 4 2r cAEN NQ r 0 a a m Q CA .°2‘7, ‘7, a)W OM I2,728 217 Mp 00 4 m 0 Np Piy :V".928 V0p 0 0 n 0 n r OW mO NM9$V VOMVt+ a0t0A0 0mR NNNNN O 'OMMMAA mppmMMMMMpMNN NNN NNNNN MMM MM M MMM MMMMM VE 00000 GGOO$ OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO OOOOO 00000 gMIMM PA AAA8Mrvoh $2MaaR ?RF, a< § rAAMMMMV VRRRC a< < CO CO N N 0 g C m E 0 C E 0 0 r _Ofn pONOn pn MRnsn nn�nRIO'S n O'fD S 2.'=288 .'=y 8 pNOA MO rR NV r RR<oGinnM 8( 8Mn 2M M n Mn Mn tn Mn Nn NNr mANr"tNr Nr' j ppOZr-RAA aOOOe r_ pN au O2O "FAA O ^n^^ OOW 0 ONCMO O212 mNgN VV NO hOOph MNhm A VNr MN 3 felf. r rr2rN rirrr rrara aaaMN aaaeea aaeaa av aaeaaaea aaaamm Nr aMDm7 aaeee aavea va d aaaaa eacac vacuo aaaaa aaaaa aaaaa co vveec cd co vaaca aaaaa ee SFPc:J g2822 RR c,1 . ^IDOO ON rNr NtO (O 1OJw O RMACONN NOMONNN cO CO RSOI2 VeVVM Orr OOORSOVOr (rO0SCS"' MNRN OO OO covo,cno N NNnNN NNNNN nnNnNn NrNNN NNNNN OOOONN8 88DpNpNp Npppp NpgN NNNNN NOON. NOco NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NN NN ,, NNNNN 00000 NNNN , NNN,NAN NNNN NNN,, NNNNN NNNA, NNN NNNN 0o, , N NNNN V NCC N--NMOItMOpNIO10D OtMD OOtND VNt0D MNaNNNNNN N vto NOMRO yV N N cy tOOCO CpO OMnMO V N�O0�NN MMJcOWO pMO((t�VONcOO N rM y ntOMCNo NMNMncNO mCNo OtNO ONOtNDD aCNO M tNo RtNO V paIAO . V CJOCJNv0vOOocoCOw mOvO OnmO71NN ' MpNAm O0 .O N"NNtNN N.MM MMy6“A MM $ ONL12a . ,ss wN V"M OOp2 m87;2W2 2 2 2 222222 © NmmNNNNMNMNN W .N .. N °4"28 NN MONnONNeOV P.AM812.8F2n A82P1 Ne .N8g28N ONMO.m ON c▪—§RNMM MgMMM 8a18.1rn83 rna o 0 o MMMMm RMM�m AP Ran- EglgiRii ERM mRo oR RRRRR RR Z ggggg ggggg ggagg aaggg agagg giaaaa ganga aggga ggggg agaga ggm gig ggggg gg N N N N N N N .^NNNN0aMp eN NN NN NN mN eN ON Npp W NN ON NN R[N a RN NN MN aAN ON aN yN mN V mN NN eN SASS'S pNSNN8N IN NrMN171:28:2,9171:28:2,9 pGN mN MN N N N N N N N N N N N N r r(OM RSV-RR .TR 0.6.-666 �000.- .666N 00000 0 0 0 fV G O O 0 0 �O CNO�M V INO W ONp�(V01 tOpO"ASO 2'S2nig0pO pR Pm 222 NO RgjOR2 NOr Nm TrA 1 nN V N 'RM@ N W GROS R2 W 2 I(J O 10 Imo t O t0 tMD l0 t O t D tO 2 P.h A r r I I A r O FN m 0 1 NN N m R W 2M;M O O O O O O O O m M - N N N N N N Z�NOeNCIO�eVIO rO0NO10C� atNO NMyOtD.X1I00. WNm0NN.0r COMM,. AmMm maoW Oma.^ NMM 0W 0 CO�MMON ' rONM nv Nm 00000 r10MC VN IOcON v M M 0t00�g ....'y NNS8 N . NR mmW MMM O 00000 NN O C N M m r a a Na�N M NI�1 M N M M M O N m r n e� th a N M N N N N N O V O N O O v v MM . 10 N N � MNN atyyO Nmo NOIOOn vN v mN NN pnp n. MOMcwO I0010v N Na M 1NNm Ma NAM NOO(n. OppN��a N r pM MIOr INMO N0 2...„�„N ROJWWo MRRmM M 000 OOOO� 451^� NNNNN MRNMM MaVVe VeN1010 10 OtDMO fD MCON� NN pj N p tp �p p a ry p (� p1 10 N _ O vow oNN O ttv 1,7 ,28227aN M V R yv o w V NOM NO W I�n mA o R O c,fmO•- t O v(MO N M n R yV�v 0 t O N OyJ m N 10 O.(O�tvh uic1cica11.00 V(pWD�O v I O A 01 v M N trO Q W OJ M R m R O o 0 0 O O H�N O O H N N N N N N N c7 2 A m A V °4-8 10.I O O I O tOO tNO I tt o O S IZ I n n 0 0 W C p� t.1 y �1 �p 10 W EETROO= (M8SR NN MM rNOA a�O rtN+NNt+11 V ARNP N RL7i W tO 10OD IOM"� NNMetMO m V :4O4 iIaRON V IaODO�M NfNO 0 Aier r M RCMOON W M RgRAM ORSSo OOn O�� AOMRm NNNNN NM2AM CNJC'TP V ve81Si2 : MtSDc%D I8Otcin:ORO, O 0 J REN-con Epa �a ear eO mee. a a anana ayaMa Ta aaaaW Oa �a0a100rIO RiI0O IO MIOM0N V 24,4 ONpp ONN pEM VvCpN aa828NI82AO. y 01 RMOR5. NDNhMM m. y7pa0NNNNNNN NNNNNNRONNN000 N0N N "( "Cm 2EmN4,1'e1016. 12 A-V r0 NnOrmmRVNM MNO 8146-2 '1842 Nm V 2,`Zn1ONa IO Nr MOaniso6csi 4c1 R,Ri0 RcMSO Mm- N � DppO ra OOlMO 88rg MNGNN mOmi2G0iNNN §RM�MNh aaaaa aeaee eaaaa aaaaa 80000 00 rOO NMN r N V V V IO IO mOnDO Av V,N N MIOINOM R��Ntmh V NOn^W MmOON N 0x00 ONNMtOo OmmMO v Ov N M e W PPASS 22SSS MSMMA AAAAA AAAAA AMMMM 22222 MMMMM MMMMM MMMMM MMMMM MMMMM MM (� yy y II�� pp tt�h C..• .MIOOIA O OM1 V ORN NNpv 100 NINh V MN Nn NRnm NQINDON IOh NIO MN 10 10m r10tOh NCM') Q nM(00 N�V ve N N M MMM M M MMM M M MMM M M MMM M M MMM M V e V e a a a a a V V V V V V V<«V O O O V a e a e e :;44f;14 a v 0 0 0ar0 000000 0 0 0 000000 O O O O O O O O O00000 O O O O 0 0 0 000000 0 0 0 000000 0 0 0 000000 0 uri 000000 O O gO00000 O O O O00000 O O O OO O= 0 O 00 g4O § RwS q s 4444 aNRam $ rn8 88888 1.122 N2202 a/11g 82788 �8 IASSS 8SB SSSNN NN O 0 E 0 d � E. 0 0 m _ app ppp_y o p appy pp m;w4 p y o ▪—.120 l+fW to tO a((.�7�1{C{��� 1ph�.M V. A. N „ ..p.. aDO_ C�- A NMA§a N(Ny M.W . M NNN(Om ONm0N NmOAO Nd t0 N C1280 O At010 4AN-O 582,1 .OaMMN $rnmn t7.g mP A W P r O t� GDOOD�mA AAOrA 12AAA N 01 NN 00000 00000 200188 m tttDDD ttt000 pm.�`pm 0 VVV VVVVV aeeee VOOdV V<a<ar. vovov vvvvv vvvvv. Oee a..OvV vvvvv veeaa «« a J OON OO Om m mmm 8 m m BmO to m mmm mm 8mm m mmm m Mom;8m 6888 to co m m O m mm m 8m coca M Ota O tb O tp aaa eeeee eeeee 44444 44444 4444e 4.3.444 eeeee eeeea aaaaa 44444 44444 4444 M ▪—8Em 0A0pp 00App-4,CV {N CO V{1(° m NOCO NV, V�,7N M M pNMM m tMpchm�a0p cON to MO N 4v,'.281N cpNO^N On yNCm')7 MN. 0_0D_N7mh N AT M TO NN Yo 10N N W In c'inl NTTTE EE vA ovI vm Vm Vm V0 VA OA OA tV0 lO0 lVD tVD IVn V IVn Oa Va Oa c., ,,m0,vN vN ---mm OO t'7 cnM J m m m 8 m 8 m t0 10 A t0 (((DOO m f0 m m ..... m m m cD c0 t0{o t0 t0 to tD fo fD t0 t0 tD 1D tD tD to tD m tO tO t0 c0 c0 t0�O tO .O.O.O t0 tD... • N N N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N N N N 0O 0 0 0 6.666 A AAA A A A 0 0 0 NNN 66066 NNN 66666 A AAA A 60666 O O O NNN.A O 666.06 0 0 0 0 0 66666 0000 N d t0 W N • OtW 4Vp NW ONO�.yy NWNAMNMONe0M7W7M O.A0NVprm00007 ONMMMnmi00CCm7 .“ . q m .? OO O .0W, rMcN QN pm07NVMmOW MANrTp NQpOPlpOmMOVOApp0 0 SepggW7 IVO. 0M om NNNNNO W MOVmm10Vpf0000ODMT$iO82W 2NgmMh0 220 8882 88880 22222 22222 22222 8288 8 88822 8 8 828 288 22 222 e2888 mM88 C 8m V 8 8W6,2A OTN W 3 ONN0AlM :',,-AT-- 00x0AOtN '8',%"' 8o'',-%% 00<m V AO�N Os s:: 2.":27±-2 M F-222 2 O 20 N " N L _ mm1- pWA NA 0hW ^ 0r ( M NprAmanmmWr oeO , 01W MNmMN78ONW 0g WeMNAn AON ) p 0 EEE agaga gaggg gggaa ggW aga$ agaasWWg$ 88200 mm�mN .ass_ ggEgEgE gaggg gaagg ggaagagaga gaga .000N00N ( 0000 m00NN 0000N 1m10N 000N0N00N0 NNNNN n00N0NNNN0 0000NNNNn 8` Q0oO06000000 ()0008 000 0000 o-00 0000 •i.- 6 .- oo .VOOO 00000 000 00000 666 snpe V W V m N 1 V�8+01 001 E M OMA A I h N W mr.r M O n oM a V nm�vN I T N m<t 0 8 0 V N aN O 7v 00,60,6 pp 88,12A p� �1O 00 VW S O VE m r V .i E T M VO n R '81.2A8 o00 W NNN PMMMA MMMM V ;74'4'44 V<<.0E N�0i0Y21�0 N�0Nt0E TTES8 tn0t0(m0n1z. n^g'gcr0 r mr r toE ONo0Tom W W ',82 OD z ON W 0 0 WnOr M< O V N7W0°,7, C. 0- NN7.1.4.0 C, NO NWN V7. r V NO,- ,NO,MK.ONWWMcoM MoM "N 00 • NO q0.?.? . '-O .Mq .O ND 0 pvGV« 0. 0pW NNNNGM MVlmVOaV MN 0VW AAN0 AnrNG MV NM m7M Vo .Y .N oO00000AA o m0om OmOEA AAA 0 N N O 0 r3� �aMN7pW 0VNMA dOp`- O<AA`- NMMMM7p 0M 7AMNN7YAO 7<VM� MWpV N<W NNpp ONM 0 0 Om00 W,, .O .00o°`- 0.0 e0 m .0W Np . p AA m012pM0000.0 OON7MWNN NmAM7pQQWW p ( (d0tMatNN0 mNAO 0 0 ONN MmM m eCe00 0000 OOw0 WN 0 O NNNN NNNNN NNNNN N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N N N N N N O O D N _�m '- NO7mA0p p rV007WOVnm77NMMN7Am (y(yp N OOmNp OMONVnONYWm.QON<ON0u, N INmMOB W o .± coO • Q mW G0 4,74,y2.- A 8000VON O 8 mmWm0tNNNRNNNy 042 m7 iO. NN4N [ NN100NNNNN. Na NNN NNNVN N VNNN N NNNN NNN N NN 0 W •c D T W_n0 -,qq8 hONODONmOpAN0 W00OMp0y ATTR WNNp0MmW� VnV .OMNm .. Q pry0AONV0rW oi p8pOmpy mpSp ,7Pj (e.nA DDZAT 0IA W8200 WONNN NNNN8N mM70'/ m8VQQ e Vm00 22888 .O2102 OAr O NNN NNNNN NN N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N N N N L 17 J 10 p0 '48V24,7, m 0. p y 0ppa a` 0 e�MN P.'.28Oe OMB.7E xOm 1212 n ,T2:244: g82,Q 0 0890)202(10 I022 227,°22 M.OMNO F1222°,2 Emt2O N U38SR `IR vA1n t WR NWWN.°i1288 .$088.0.8 ZOGG .No `m"g.ND`.o`2 1.223 sgssW P.88WW 82221^8 .Ao.222 ..e0...0 ON°2 000 8'28 -W W m W F."228 OMN 2^8V1 ^N W 1 08403 420 V N OAN2P.V Mm 222'42 V W AWm--N N 00 N WaAW 0W [ YONVW 12r^ Y ( 8mmmmOO 000H N fD( 1200 n000 SSOf' .0 .20.`O' .NO ."0'`8"tO ctD' tD T2221 SEES'S .00 W.NO W W 8 W 2T 2 Ln 8MAo0MAi 7M V mAAAW777772N 7 m m 7NV N N V.4 A N0oM .? 0?7, Od N7Nm0 ODEO22mMM N M .00 ON I- i7 TRAP( PAP mm mmmmmmmmmm?VVVVVVV000VVVV000VV?V0 VVOV< a<V0mmmm mmm MEM Q C:.v MN NN00m N07m7 S07,g M NMN V.0 OWOmN N0070, 002,20 OV pm OD A.O vo NN NN .M0NWM, MOWN, .00 W V 0 MWMM MMM cV cV cV cV N N NNN N 0000 .1. 1..4.,i-d- V 0 0 m 001Om r.:1,: 1.: maaa eeeee eeeee aaaa a MQMm MM010 Mmmmmmmhh • •m �tmmm m m m m m 2E88.8 88888 8888 00000 88888 88888 0000 0 0000 88888 8888 88888 88888 88888 888 8 88888 8888 0 000 Qir; gosi142 888 A00288N8ONNWrAyH'gM a8ss,1M02 88 88222 28888 8M2O 1212088 A`nN .F1,- .nnM 1212a12pNrAn .OtO O co co Ny U_ E c E co _8 68ZZAR p8,88 Vo-8t=6 826X6 pp a �O�p y o ' O W{6 A A m OO8oN O6 co SN as NN8I N Nm88v O R§8 Zn 0653 2Am m O S"-m m_ O N f7 N r6 6c2o, 2 2§oom2 LA m WAON rMNa n_.cc�� P _ .5� (� c��{ S WWWWW SmSmS Sf313 6� (oWmmm m�mmS i676SIM ($(�(�(g(� mamma ($(� (�ifi i6§SSS SSo6co wwggg m 0 a avaaa evaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa QvavQ QQaaa aaaaa v,aava M ac 66666 66666 66666 66666 6m666 66666 0660s6666666 6666Gc 66666 66666 6m666 a aaaaa eavaa aaaaa aaaaa aaaaa aQaaa aaaaa aaaaa eeavv QQaaa aaaaa vQaQQ 2 21 , .m, , ppfp. (1�n pp, , , pp, mW, , , , , , ppp , , p, , , , y, , , . Q�, , p,�p , , p,ms pppp , , , a csi mNOAO MOWNa NOGG(D V �� N (NNV 011nN OWf "dMO � ODOA V ��tA Z,-011ZnrOa^ W r OfO In InO Na«< V� M M ti m m r n N(Qpj��((AypJ A a �typ�typ �lpyO tryp fp(ryWD m �tNpO��(py��(�py�(ftp(ftp {(yO{(gyp (tp(tp(p f(yp{(�O N 1,000, N N N N N N N N N N O1 N C N N N N N N N N N N N 01 01 N N 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 0 00000 000OO 00000 00000 00000 O O O O O 00000 00000 00000 O GOO O 00000 OGCC0 N V m ON N Ci-62 Mm:82 Mp028 0�a0y yN1NN GrOMp 22VQ6 2R°4%8 nOV00 YVP.AN pnS82 282 208gV • 4 CO"gTi N OCrA "'it"01gN �10 mi "'i'i CNNn" liooO g§"1 O : 4 no" WNNTTNW 0A 001m0gmmW8 mMNNgNM W WWWWW �82WW 88888 h ?,sWWWWW 88888 §W§W8 86,WWW8W § §Eo8�$ m.O�§§ §§§§§ 01f0 t20Mg0 W •-min.-pp 0.-.-OM mq ,7�pp7 A W AN W •-00G60CO Q T lnm(000W 10 7 W 740.00 000�0 0 7 A W N sr‘-A.. 00,-00,-00 ES.. 'go. A; -(O Om (O� m, g6001AN.R.gNOIW7010 0C�W ( a.A O7A -,:.q0.,0 0060th ECm OMC.'7O ¢ p0gR;RNN2.om 8 0TS7N �7,,pg0 nm6..r8 pcoV=28m2AA82yy2RNN O 0 pOOyO MWWWW 22222 2222 NWG6O ODTOWT6p88888 88888 rrAnA 4. Wm AAT _ VVgggg aaaaa mom o aaagVgg ggggg OOONa aN.gNa gggvaaggg agVgIgggg gggggNNNNNa m2W 0666 W0000 000nN W0000 000N (00000 22NC- NN00000S 0W2mr 001W0 N2480 DG 0000 . 00C 6600 GGGGG 0000OOOC " CjM(pmA 6M6 0U) On .- 6. 00N OO�CV CV ���(`�m X10 IY V N,'N1r:N 68626 V 7AAR '5 8 V VVVVVE OO A 8ON W O r70NA2 8 V R 4 00RW V ANrON 6N00N pp§ 006pW mA §S 0000 00000 0C)NQ aWAW MANN NNNN 017N Nl00701as e ev0 N NNNNN NNNNN NNNN NNNN ,..,,NN NNNNN NNNN NN0N01 0NNNN NNNNN C0 M"8 04 0 ANTE; NWm< "6664 6664 AVVn WN NWNNWN 4'00"0n '1jNA Ac2P.'" .7-8A1.74.7-8A1.7-8A1.74 VN 2.2c688 0 048N(04`�2 "A"TRZ . 7 NOmAMnGN C ,SSS N0AmN7m mOOm 0mmGA NVGnVpppAmppOmmQaOm NNNNNN NNNNNNNNN '1"1"1"1".1NNNNNNNNNNNNNNNN ❑ N N NNN N (V NNNN N N O_ p p (p I0 ( ❑ eO o 0�NM V Mas g6P10(7 ;6848 (NOf070A10 A r �(� :5!4:: Nr W OA m n SN 288 17040; :=8628 3 06S pp N MG D ?0 O �� N M7 W W7 a U)mp0y Q7 m h m p A N p N O p a W p in 0 00 0) G NNOm W V°'88 GD0010 W N g"" (D O0'' g"" VN NN NNN MM (7 CJei MN"1 0(7NN(7 f7( 0$0 co cl (, N N NNN N N NNN N co NNN N N f 7 R 2 M (h M(7(7 M M MMM f 7 ((74'M(7(7(7 (7 M(7 (1 O {p pp a (y p {p Q (y p N °ETO r(OC)MQ 0822600 (26 AA V 0041(11[pp(7(0p 0p61060(00 aMa W 10 p8pp1R 0)COOj04{A{pp COON W 00 64'4'26 000400 POmi00(m0 82688 Q W GDON(A.,T 1 N AON A N A nN ONm00 So FNM 10WGND0,- ..-NNQ 10 ,-6666- , 1(l�n7�(pp�7 pa Q yNy011e(�. Fs0,9NN {10704 {1p01A0 ❑ • N N ON1 N 88888 N N m 6 6 6 6 6 6 6 M M M M M M M t 7 1N7(7(,Nj M M M M M M t 7 (7 f 7 l7 l7 N f 7 l7(7(7 N(7(`W')CW')CN') M f 7 f 7 Q 0 Lu • C D e Q T WC< W MN�M7 W<N004 0 0OM TMN �OmvR 00mMAOMyy WWA7y0NON� OO(Or N MMN N0 CO NNNU) N0U071g 'A 00 NNNOWNWW NN N NNNNN NNNNN NNNNN N6666 660 0 ; PriRR AAAAA §gRRA L 2 C00 0 10 A a Cv N06nmWm 040860CNMWW •-aAON �pWN ,M0ONmV�AO M0,-MW nWvaN nONp • .. 70Ww7NFWW OW COO . I, O ?c!W 10 0 LQ6 .O pMN_a000 N0W O6 ""^"' "" "i 0 Nm0mAVgom0NMO gWWW2TomoO Po-RPA AAAAINr IR'.n nnnnn ryAAAA nnnnn nOn0 nnAO1AO ?2,92—Ta sem <N 2GWOp mcOPP82 68 81 8 V 741100 6 V NN2 m N0OV O R 828 N 0P01np00 8 O NW 2 M o 0(." W P Y 64 2 0 7 O A 0 $ayiWn6700 NWnm^ 0KImp AomTWW00 60OOO,- N NNM2 gMO0M QQAQQ N06W6 Ny8W? nWA046 m080 Om0W00 WOWAN AAAA, AAA AAAAA AAAA is,,,, AAAAA nnAAA A�nAA AAAA A ere,.Q OINA a W am W M W 000 NOINNM V a V aN ,00,10 W O,GODN ONm,o.- W 4610 -,f`m.W 104aOr(+7 .-0000000 2 re,. AOA O(7 AMV W A nn E Q g;;;; v a e a e ;,7-g Q Q Q O V 44444 O O O O V a 4'ma M6NNN NNNNO C0 66666 NNN N66666 N N Q C rA 2.7688 006Pn AT S71 8 78R P N V V On 686.2V AC.2V8.1.6OO 0600N68 NR8OA NA< 241 N V WA2488 0 00000 R** M AgAAA NNN7W8640M WAWA* 6A6Ag MMWNC00 yyy0p NM0�6N NNNN N NNNN N 1:1',0 0.-,... O O O O O 000.0 $Soo 0.000 O O O O Op.p.. $O O O 0 0 0 0 0 8O O ..... O O O O O SSSSO mEc00000000U) 0oo 00oOO00000000 OOO 00oU000oo.Oo U) o 060,o40 60666 0 NSNpA QNS0B8m 060nn nmmWW PP,Tpp88cOCD ODNmW0 00000 0000 , WWmWWW. mmWGq D m pm0666pNy WDD0 0NNNO O O O N a) U > tn € 0 E N S •E g 77 8. ry C U . (0 CI co appv, 4444 o 4_ oQ:=8 2274°2 4224g p2nR2g§22 q27 §EIicnEE rnmln n$ 4`l� mm M8rAAoveoi0 N,--0, qtO �pppp2O 8 p C CM74,00 �mmmD ...WO ppppO08Wgg 0N , Ng282282p22[N 2E88 8882 205N sv, QQQQ44 . aQQaQQQQ444v,a v,vvQQQQ veevv, aQQ444 d 4QiQe4 44444 44444 44444 44444 44444 44444 44444 44444 44444 44444 44444 a , , , , , , , , , , , , , , , N , , a i 4E p ) pppM0 0 2;8022 888p cs4 p 0pMN � gyy py0 ( 00 pNN 00y . 2Wg3 mNmny N (; p00 aA pOpp00000ppp8 NaM J mO . O... NNNNNNNN.N . ... .. .. ... 00 NNNNN NNNNN NNNNN gNLN N NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN O A 66060 AA o ^^^74 0 0 0 0 0 0 6006.3 o000o 66666 6,6666 nn A r n n A A AAO G 66666 0 0^^^ 6,6666 N V N 0N� p0 el pp WMNANnEm00NSMWN MI- Mp0.-VW 00 �NN NrN4p OMMN�pCS7 ).) rgc7O> ,.. 00 102 0 0 2 O= oi<an oFgg00088888888888888§gSa .AA A888888E88 bg$$ 8m8 088mm Dmoom ... m mmmmm om... DDDmm mmmDm rommmm mmmm mmmmm .... W.... mmmmm m M N rO9N N ? ; ,O OO ,O ON N'4:.? NN ,000 010Nmm Y . ( m. . '-"N°6 '.°N.'EN nA p{pnONNW N- pp2E2Am 2yI22E8 82 DAA N222830E N 22,7) F24,--,,- 000 O I8AA AArAn rrrnA rAAAr ,nrAr nnAnr2AAAAA Anrrr rr t7r0rrA z IAAAAnnanAAAIX Ag22Aaaaxxx gagag gaggg gagag gaggamag xanaa IA aa 0 NON N00V A , co.-coon ��NDC r7EWNVnmI ,O 00W'47.2 8207.4 f72W02 2222pppNMN 7. 0 0000 as . ci. .-r-141..,.- OONN 6n66..., 0i0m nmN. mr0VO f ,V 1 ,D0: 1 < 6 O1 ,0O> 01Mmc4 N 3 i 827 W O22E82 282g8 E2 2E822828E2 2I 2 r 00:2 7 8 N N 2E 78822 2 E 222 82242 22224 82828 28222 0pN � Nm NNNNVN10NNNN NN1NN( pOpg NN NNNN NNNN NNN NN NNNNN T,VN2p81008 MMM'' 747422 2222g 2 E ,y C2p 0282 CWop,8,Z E 1G0 m�4"..°2 O,Wp.7rii,8 cpO 8 EE 26 m228 ,a 2.188 V ENV 8 V 42,7. 0��j2 10"i0 M,0 M 4422 ,�28 p4�N m 4 VN4; 10N22N i0 i0 10,0 c0,0,N0,D,MD . cli NNNN6 0 N NN71 NN NN68' NN cNN N N cT''? . 7ih7ih VW? 0? 'n th C) CN N N N N N N N N N N N N N N N O O C 8888c4 Fn'884o 88288 4874 O^ 84282 am 2mm 8P.128 P.028 O484N mmMmO ,7,872"03 gi"88m '823" ptsp. O � ONW ypO y 280f N0000 QVVN NN'gM V0RVVV O O 8.2 8 RAMM',,. A7pwmcm 7MspM MMMM MQQQQ V e QQQQQ QY V< V 4 N N 0 AHiN _.- "'N'N ANp,p °'-8°'-' NOONgg7,61 ,N �QQ0NNNMaNOAOp'N 70"ON MiOCOpp Nm4MN NOhNO . 9 mog � ` 4 4 4 ` t 0 M:RA MRO, MM[M f'- :5gRR M 'RE AI 44400 74;441 4< o 4 gQ 444:4- O W C 7 G ,V,1+7� Cp t(Vy Cp t1vy m tv tO t(V� p a 8E on2 M 2t0.- Mm2V,$ CmD,OICDAE NOON., Em.17 VOCMDWN NEAN.- NVisuiN ,pgMM N� .,2O X2:142 °V2428 m �MMMMc MMgMM�m M ,NN n ,Nn,Nn,2o,oN MMMR 'AAsM1OM1 '80464 .-.-.-Nayvv VNNN ,MM `mMVVVt°i G2200 �Ot-NN 0 a o DMm m d vg wc7F,:2g, gg $ 1In0 O 2 OInp�m 74 4m000 4ImMN. pNV0N r ' OOW0CCANqN[NJNVp N 00 o s.c...'; WW W �mmmm 2 1a yyNN m100Wi2 m)0nm myoN2 mANm8 8 8 3 88 AMA 2E 84288 ONAEe A 22 4. 88287, N�828 00g8E8227,74 2 A MO7 0 2 2 2 r 0 A 0 28 88WNE 27 V 2 2 O 220py048ONOOT, mm Nm00W mO28pEEE W 8888 N2ANWWWWWmMM mNCmmm mmmmm mmmmO L 22g22 ;4;742 2EE00 82 228 8S V,D.2 GR W N W 4M10N ON(Np,O,mO. CMN V I() RON(,2(D�,0,yy AAA ryNry (W.:1,y(W,MO p?p I... 00000 0000 i �O>00 NNNNN NNNNN MMMMM ,N70MMN NN.M,7MW MVV 04 N.0.1010 101001010 N1010 IW�0 E m m �7 p ,p,p Cp a c- m m r N,0 -N M fAO C. c1 9, .N O Np r N. Cp.N 0 0 2 2��. . CmD,1�p0p 4 0 �Nn 120 An,pO n 4 m Q M(�I1 ,N83. Oy 1pp0 O1 0f�A 10 0 N�tppO A W 4 N f 7 NNNN N NN M MM Mc7)g R M Z7Iggi19ico, 17 MMOM ,274 e Q V OQ 10.N M'N'�0'� g N2888 m 3.88 Na A n m W CD mE m AA orr- 00 0 p 00 000 o p .-NMN WOEN8"W 00 28 p1N8W D-N mW V m2mW2 W 10 0 W 2 0 h 0'00oo00 000 O 0 Q 2 TA NON N0pAAAW01 01NOi N2E O1 eWpWO0WmNN 0000 0p00 00000 S O0 W82p 2O22 W200 O CD 02 O N U) U_ 8 _ I o O C U r 0 O mmil 2 2mlm ai Snn g 1111 22222882 V2222 22,1,1,1 1,1,1,11 NL7Z5L7S SSS8�S�S S G 44444 44444 eedde adeea ddddd ddeedddddd eedde 44444 44444 QQQQ Q�ce 4am4 44444' 44'4'4' 44'44' 4'4'4' 44'4'44 44444 44444 44444 44444 44444 44444 44444 44 m� oo� tN� vv� � � wp p� m� a� p rnp� fV {CCCp p� wp V� d RA ge d p Ggg m ^QER L- n NO qq c�c� v�Q� g ry66666 u'r)628 2i 2fTS�S gg2)TS7S ng vv3 4''S§N N NN N N N N N N N N N N N N N N N N N N N N N N N N N N 00000 00000 00000 00000 OOOOo 00000 00000 00^00 00000 00000 00000 00000 RP N WW m NTe IM�OO AO mANA1 84222 4222 V r 28O r r W p N mmrA{O N 4.ttmO0 rN m a r rOtp W CC ANA CC MN:1� maven mveN p m V22 ONpp2 pmpO ayrpmp Sq 028 0O N , NNNNN NNN`g4 phMMV e4444 4-SSNM ^mqp 1g2 262R t:nnn!, f,r, �m p� p� 22222 22222 28828 22222 28228 22222 88822 22282 22888 88282 22222 22222 SA C t7fAAA VV 8m8�n20 NN<f0 V NINA, W ON VW VO VNCrDcaoi .< 8�6 X�4p22 64 y;�22O.tC2 Cn vpV 8188 m888R 8R42R 42228 48 ;N t`M' A C 8 2 2 x 2 t O g c 0 fro f 0 6 2 2 2 2 8 8 g t00 t 0 t O t O t D e 2 g OND e g E fm'O f 0 f 0 s f D (0 E 2 2 2 2 2 2 2 6 N N N ggs M n O (G I A N Z IgIAA AAAAA AAAAA AAAAA gAggA ggggg 1Aggg ggx§A §§ gag§§ g4' g 4'g gg NNNNN NNNN N VN N VN ffN�7N NNNNN NNN(No N NfNyNQNN N N NNN NpN pN N p pp f p fr fr f 4' 2 4 6 0; 28224 M N f D t O N 2 2 A M N 2 rm r S C I 22;1V 0 4 f`2 6 N M N N 0)0 f°)2 r n 4 V 2 f 0 N N 0)0) N N 0 2 A 0 f O A 4 N O C p M O N m C C O I h C M t M 1 C!Cl t G r f V f n Cl N C N M d r f C f h N N t h W N N V f h O r '0'Q O f+)f M m 0 0 0 O m e N C 3=R2426 28424 AQ0,CC 0UAMn0 `,'828 gV224 82A$4) 221,R;:A (22488 cifh 8200 NN0). 000N0 0)01 fFI2222 SSR 2AAAA AAAMM gg.m.M) tOm7fm7N t7 `r* Pim; ter? trr7piM 2 MAA AR m fAA meAmmm AmAmA veer eg VM MMM M M =cOOAOOD4 2EN4 n 6 N Nr 0 Vlt7o ( r rrpmEAD 4008 C29Om 2 mDN$0NNNrN A Nh 0 0, R',2128 N O N 6O f NN vr4r6S Mm 6;06 PNO;mOfAd A 42 mQ O 0416 r2NNM 2MNNN NNyy AMNMM M4m OdWN 2OM WNd pO M02 ,mMNOO?M 4'M444 WmM 0gw4 44411 ,13,C CV CV O_ E C0M'eD A A Nd 9A0)0O O m�r D -�0 0 0 m 88888 28A:20 088 dd r2NN 28 gO mA Wm Fm 09m 7 M m d mOr 122 2 G WaA,0mROA6W 42209ZTCOMNM 821gQ NrM' OM2g 80M00 212104 4rmUm2O ✓ mO42222 UAN2NNN N 2 66 m9NNW Sppgp MO4' ppm 024'4' m 7NO N O fD8 N A6AN 2'104 2N8N848D4 ?99n9n p2822 82QRS C, Ayp 2Nf �V 8m=Z27Ne7 OAAA, NA7 4 mmrn, 666c61 2aiGgg r82mQa "mmoEs NN2gg m2gsg 8Ktti,% �g88g 8�8y8 os'22m88mEmes i62 S 're terotrro d dee O w C pp "4-;-,842 pp mm p�p f� p m tp p W CN(OAPN 404 AN N 400)22 -OM'tt6 AAAAG 90070)O v '4M282 tNAA'N 4 dd'2 n 02'421rz B 10141 R M 222 r O m > m DrmD$m rnrnN4$� uN'iurs)suN)R `ve�,9999 2ElECl- s En ver)2r2r Ar8S smuWE)gurW) 2222214' Gt'o2 2 `$m)gfNMogi figa'gm 8d o d d d d Q Q t0 2 t U 2 f rV pp N N 2Nm n A0N0.0O2OC 2 n O)p91r'(` 0 '9881 2 2 A n n 2 0 2 42182 p W O O 86:=R9 qq pp▪ M02M 00hr22 28011 990- 2222 88812 26226 6622 MN888888 88888 88Agg g8S$$ WWg8888888 88888 88888 88888 88888 888h U8 m a m NOo0A 32ONN AAnNN V nAf`�m Atm7N1Z I[) 20006 Nov W n ACNVA W W 2IreNN2 282°O) f20N8O; 2Nt`�l7 4fO m C e 1 0 4 f�f�f�c� > 28888 8i8i888 f8°,2f8888� 88)mfm8)fm888) mmmom 4,40s= woo 3 2A6 66666 SAM 81888 11202 1§128 mE 99999 99999 mm pm mm mmmmpm 99999 99999 99999 99999 99999 m (mytptp mm�y Nmmmmpm mm s° 2s-Ng ON"N% 1 04 Si2A 2rO)NO) 4 V 861 N V 062 24'N N A fn2NAn NNA A8 n(`M')t0 N N NN N 10 N A 1Ire 4 00 • 88880 N���� NNNNN 08888 88888 �� 82626 82286 888(06 f�8G88 28282 8(,2882 88 _NEN C° A288 W r 2 n n 0 r V 62 2.4:21;:s N o7V/V 28814 O)V N 6 A V Q S OM 81012 2 n 2 2 2 20/2R 824.Atrz 8882 22228 22222 22066 22226 66262 6g89g g8622 22288 22222 28222 22ggg gg 2=82282 Nn -M8A°d40 960NDN2 0p4 124.8 W n1AA O);nl(pm)Op) yp�p1lf)M1n f'p�(26Sc71 2Nfff..20)It�S mMfmN�vty^p fl esmem� Ntt®9 O O M W "g3" A V m O O V 2 2 f A t D t O 2 f0 I,r m 2 T W N N N f V ri N N N N A R g N N N NNN N N N N N N O O O O O N N N M l7 M M N 0) U_ 0 at m E c E o 0 00 E.. j \$ / E CV \\ \ w-(( 041:7 \ co �§\\� \\\\\3E212 k | °7,7,7,;¢) a a... .£f§ R § mm CO3 ,042; o |a;! k /\OL2 § ! )b / kk(\� \ -- 0 ��))))) - 0 2 §(\ E 0 k p >`M): !!04#59; co - ,oui, a 2 0. ® /0650 �`§) k;!)» E 7- k�\( ( 0 0 ci ! 2£as \ =-88.2.2§ ZD { § (kk)( I-k a §g 0 @C !• .a..... �a ,) ) !-..0.D d■ • ■ §kC\ 0q ( .(} 02E” k;2 \$ o7` ) ir 8 \ § C y 22\A 1 D VD CO v X ,,, �p > v, < �1 n O -0 v '' 7 lNfl T = d -o o m D r�o o C BTS 1 z * r- " m 9 ap C_ N 0 Iv z k`' _. a w r C 00) d co ,- N J 13 " O O , •= N O - , O 0 W O 9V O `'"1 Oo a.'�!`d". N 3 m a nni 3• - 70 ,-r P- O N 01 O N N tw9 N O N to V v 0 Z t2`,,' CT a ac ffl ro 0 N c � A w w v C) O A m w cn n D y c D W D w rrt. . iD ) `° CD - o CA v ,D r1 n� - to W g. ,n = VI o7o 00000003 > 000000030003030303 ,,, , w o . C o m m .a to 011 w n D (4 (n A N 0 n D A N D D D X a� r oA Ewagamo 0_ C > CD N Z L C -I Z X B- CR Cn C L C C C O ,',' v o MetMN o W -T o D D N C_ C D 0 �I n C- 0 CD 0 0 0 0 0 0 0 0 2 rrr 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q '7C �' 8- 00 . 000 - 00 .. . a00 -. 02 — - — „„ ms C/� Al O • N co N O O N O N T �ICD 0011 -1 W A, �I 0 co N O N O O -n W 00 A O O N 00 4 m.. C9 CD H X X X V,.z -40 p m. D rn X X X X X X X `'rn vl • C, IV X X X X X X X X X X X N Z 0`1 -1-r N 3 V ha W W 4 m: vs;n i CCC D -4g3MM0 ] 00MM70MM370 WWWmmmmW W = WX _ = n W ) c) oc) C j _+ q33 'T1 O -ri TI- - z zzz cn -v O O r r r r �'-1m -< -6 X * mm -I 0 Mm xi r CO -ten ;v C C m z r0 n m B�Ta 00 -< -< z0 z' S .4" Co 'p Co L• $1) > 0 X O (..1 -.. -161...) C• .r ^ • Cn kw !D_ J N rNN , Vv �1r- N .a. OD ® V O IV V V A , O 1.y P:i. ►�1 0, a) N,,, j ,'1 -tis !i' �' Z d0 N rt. . N\ .a r'J ...° ..... - J ..a -L N _n �, J o rD •- c 6d W e.1 8.1 tet Ga All 6aD 1,1 NI N W N N IV N Iss Ca tag ,t+ CA 0 D n.,7c lrl n \ 1.0 ac '' Y LU Cr ro n 01 (D i- s? V1 (I' °, N ov, Tom+ LA v v n cD {D C .-. aaa ao p. C., ,i r K A �' O , (l O `S O ,.l N ti .� O 000000000000000000000� � � .i � mef. � i � � er � .SmeJ 2me . 7! t. e-,) vim• �t`I Ul ® 0 0 0 0 0 ® © 0 ® ® ® 0 ® ® ® ® 0 C3 0 ® �...t. : Cry i . a +A1µ'` .LLS • t'►`, 012-1040 Regg, James B (DOA) From: Rall, John R [RalIJR2@BP.com] Sent: Monday, January 21, 2013 5:22 PM Ivl)i To: DOA AOGCC Prudhoe Bay � Cc: AK, D&C Rig 273 Well Site Leader; Daniel, Ry d; Kilfoyle, Jeffery A; Allen, Kenneth W; Egbejimba, Uchenna J; Schultz, Mikel; Rossberg, R Steven; Sheffrey, Tom (Fircroft) Subject: DS 02-12BOP Useage Report Attachments: BOPE Usage Report to AOGCC 2010.doc «BOPE Usage Report to AOGCC 2010.doc» Well was shut in after it appeared to have slight flow due to drill gas in mud. There was no SIDPP. John Rall Operations Rotary Drilling Superintendent 1 Blow Out Preventer Equipment ( BOPE ) Usage Report to the AOGCC The purpose of this document is to ensure timely reporting to the AOGCC of any BOPE use to prevent the flow of fluids from a well. Field Superintendent Name: John Rall Wellsite Leader Name: Will Turner Contact Number: 907-659-4618 Contact Number: 907-659-4718 Traction Number: IR-4335789 Well Location/Name & Rig Name: PBU 02-12D; Parker Rig 273 Permit To Drill (PTD) Number: 2121040 i Date and Time of Incident: 01/21/2013. 11:_30AM Original Scope of Work: Drilling Operational Description Leading up to Well Control Event: Drilling 6 1/8 production hole, at 10399' MD 8910' TVD BOPE Used and Reason: While drilling recorded 2 bbl gain, Flow check well, observed flow, shut well in, SIDPP 0 psi, SICP 0 psi. Circulated bottoms up through choke no gas observed, monitor well SIDPP-0 psi, SICP 0 psi. maLh S uve Is a BOPE Test Required after use ( Yes / No): Yes on next trip out of hole If no, why? 24 hour notice required to NS AOGCC Inspectors prior to testing BOPE components. Plan Forward: Drill Ahead i Additional Comments: Email to AOGCC North Slope Inspectors within 24 hours of the incident: doa.aogcc.prudhoe.bavt alaska.gov Email CC List Well Integrity Team Leader: Ryan Daniel HSE Advisor: Jeff Kilfoyle Engineering Team Leader: Ken Allen, John Egbejimba, John McMullen, Dave Reem Wells Operations Manager: Steve Rossberg Wells Intervention Manager: Doug Cismoski Organizational Capability Tom Sheffrey BOPE Usage Report for AOGCC Rev 1 September 1, 2010 -02-12D PTD (212-104) Page 1 of 2 Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Tuesday, December 04, 2012 12:47 PM To: 'Rose, John G (ASRC)' Cc: Egbejimba, Uchenna J; Daniel, Ryan; AK, D&C Rig 273 Well Site Leader; AK, D&C Base Operations Superintendent; Regg, James B (DOA) Subject: RE: 02-12D PTD (212-104) John, Thanks for the update on the rig schedule. The changes noted below to the PTD are approved and I will make a note in our well file. Give the inspectors plenty of notice for the walkthrough .. .. Regards, Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Rose, John G (ASRC) [mailto:John.G.Rose@bp.com] Sent: Tuesday, December 04, 2012 11:46 AM To: Schwartz, Guy L(DOA) Cc: Egbejimba, Uchenna J; Daniel, Ryan; AK, D&C Rig 273 Well Site Leader; AK, D&C Base Operations Superintendent Subject: 02-12D PTD (212-104) Guy, As we preparation to begin work on the02-12D RST with Parker 273 (the plan is to begin moving the rig to this well as early as Friday of this week), please note the following changes to the information as originally provide for our PTD: 1. As there is no need for a USIT log on the existing 9-5/8" production casing, there will be no E-line USIT/CCL/GR logging as indicated in Step#5 of the "Planned Rig Work" on pages 1 & 10. 2. As we are now using a new version of Kick Tolerance software,the planned FIT prior to drilling ahead from the 9-5/8" window will now be 11.0 ppg (the previous target value was 10.7 ppg assuming a 9.5 ppg max pp/now assuming a 10.0 ppg max pp) and the planned FIT prior to drilling ahead from the 7" shoe will be 9.1 ppg(the previous target value was 8.8 ppg) see pages 7 & 12. Per the PTD (212-104), it is clear that we will work on a 7 day BOP test cycle throughout this well or notified otherwise and that a rig inspection by your Slope Inspectors is required prior to beginning work on this well. If you have any questions or concerns, please advise. Thanks -jr John G Rose BP Staff Engineer 12/4/2012 02-12D PTD(212-104) Page 2 of 2 Anchorage,AK rose 11 abp.com 907/564-5271 Office 907/748-5223 Cell 907/243-8813 Home 12/4/2012 r r7F.r., ir'11W,H 4 H ALASKL-- SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W 7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John Egbejimba Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-12D BP Exploration (Alaska), Inc. Permit No: 212-104 Surface Location: 804' FNL, 894' FWL, SEC. 36, T11N, R14E, UM Bottomhole Location: 856' FNL, 4974' FWL, SEC. 01, T1ON, R14E, UM Dear Mr. Egbejimba: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this 3 day of August, 2012. cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALAS. .)IL AND GAS CONSERVATION COMM. .ON JUL 2 5 2012 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a Type of work: lb.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone ' 1c Specify if well is proposed for: ❑Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑Re-Entry 0 Exploratory ❑Service-WAG 0 Service-Disp 0 Shale Gas 2. Operator Name. 5 Bond: ®Blanket 0 Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 • PBU 02-12D 3. Address: 6 Proposed Depth. 12.Field/Pool(s). P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12969' • TVD 9055' . Prudhoe Bay/Prudhoe Bay • 4a. Location of Well(Governmental Section) 7. Property Designation(Lease Number). Surface: ADL 028308&028311 • 804'FNL, 894'FWL, Sec. 36,T11N, R14E, UM Top of Productive Horizon: 8 Land Use Permit: 13. Approximate Spud Date. 4356' FNL,4255' FWL, Sec 36,T11N, R14E, UM October 1,2012 Total Depth: 9 Acres in Property. 14.Distance to Nearest Property. 856' FNL,4974' FWL, Sec.01,T1ON, R14E, UM 2560 42200' 4b Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL 56' feet 15.Distance to Nearest Well Open Surface: x- 687642 . y-5950398 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 600' 16.Deviated Wells. Kickoff Depth 8521' • feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle 91 degrees Downhole. 4056 • Surface. 3235 - 18. Casing Program: Specifications i Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing - _ Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-1/2" 7" 26# L-80 VamTop 1314' 8370' 7325' 9684' 8443' 253 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 VamTop 3435' 9534' 8314' , 12969' 9055' 424 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft). Total Depth TVD(ft): Plugs(measured). Effective Depth MD(ft): Effective Depth TVD(ft). Junk(measured). 12598' 9033' 9638' 10540' 9000' None Casing Length Size Cement Volume MD ND Conductor/Structural 109' 20" 255 sx Arcticset 109' 109' Surface 2702' 13-3/8" 7200 sx Arcticset 2702' 2702' Intermediate 9848' 9-5/8" 1000 sx Class'G' 9848' 8577' Production Liner 405' 3-1/2"x 3-3/16" 111 sx Class'G' 9726'- 10131' 8469'-8806' Liner 2900' 2-3/8" 61 sx Class'G' 9668'- 12568' 8418'-9034' Perforation Depth MD(ft) None Perforation Depth TVD(ft): 20 Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact John Rose,564-5271 Printed Name Jo Egbejimba Title Engineering Team Leader � /J f Prepared By Name/Number Signature -j�' / Phone 564-5859 Date 7/25 112 Joe Lastufka,564-4091 b'` l/ Commission Use Only Permit To DrillAPI Number: Permit Appro I D e: See cover letter for Number. ,2(z____ /0 50-029-20277-04-00 1)0\ t -• other requirements Conditions of Approval. If box is checked,well m�a ptt_.be used to explore for,test,or produce coal ed methane,gas hydrates,or gas contained shales: 4. 3'' s OOP Irs/ Samples Req'd.Other: P P q Oyes Q No Mud Log Req'd. 0/es No H2S Measures: Yes 0 No Directional Survey Req'd. Yes ❑ No 74_I /5©P je_sf ejc,/e, • - 1'0h,0e., re..,--2 be-1 c. Op vc 'oti. C.00-nm APPROVED BY THE COMMISSION Date 8 — 3 — t Z / �`^ ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months fr®tRdtt 1tnr1A( 0 25 .j/ Submit In Duplicate IL �,( p' ZIZ u ((vv A' 1� � by 0 To: Alaska Oil & Gas Conservation Commission From: John Rose, ODE Date: July 24, 2012 Re: 02-12D Sidetrack Permit to Drill The planned 02-12D rotary sidetrack is currently scheduled to be drilled by Parker 273 beginning -10/01/12 (this well will/may become the 1st well for Parker 273 versus the 12-15C well as recently permitted). The maximum anticipated surface pressure from the Put River sands with a full column of gas from TD to surface is -3235 psi (assume 9.5 ppg as max PP at the Put River sands). This well will be drilled by Parker 273 using their 5000 psi four preventer BOP stack (3 rams and an annular). The BOP's will be tested to 3500 psi. The sidetrack plan for the 02-12D includes the following: 1. As pre-rig work; a. place a -500' cement plug on both sides of the tubing from -9638' MD (est. TOC at 9138' MD). b. make a tubing cut at 8800' MD. 2. With the drilling rig on the well; a. pull the 4-1/2" tubing from 8800' MD. b. Clean-out the well to the top of the tubing stub at 8800' MD. c. Set an EZSV at -8496' MD and test. d. Run 9-5/8" whipstock and set on the EZSV at-8496' MD. e. Change-out tubing spool and 9-5/8" pack-off. Proposed Pre-rig prep work: 1. MIT-T to 3000 psi. MIT-IA to 3500 psi. MIT-OA to 2000 psi. 2. Perform a tubing punch just above the existing production packer at 9599' MD (tubing punch at -9540' MD) to allow fluid circulation to the IA at that depth and circulate the well to clean seawater on both sides of the tubing. 3. Place 500' cement plug from the top of the bridge plug at 9638' MD (on both sides of the tubing above the production packer at 9599' MD). (-35 bbls of 15.8 ppg G cement. Est TOC at 9138' MD.) 4. PT cement to 2500 psi. 5. D&T cement/drift for jet cut on tubing. 6. Jet cut the 5-1/2" tubing at 8800' MD and freeze protect both sides of the tubing with diesel to 2000' MD. 7. CMIT-TXIA to 3500 psi. 8. PPPOT-T and IC. Function LDS. 9. Set BPV and test. Planned Rig Work: 1. MI/RU /confirm barriers. 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high. 3. RU and pull the 5-1/2", 17#tubing from the pre-rig jet cut at-8800' MD. 4. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at-8800' MD. 5. RU E-line and RIH w USIT/CCL/GR to 8800' and log to surface to determine TOC behind the 9-5/8" casing in the 12-1/4" open-hole (if any) and in the 13-3/8" x 9-5/8" OA(est. TOC -2250' MD). 6. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at -8496' MD (competent sand / confirm with GR) as required to avoid cutting a casing collar while milling the window. POOH. Rig down E-line. 7. Pressure test the EZSV to 3500 psi for 30 minutes and chart. 02-12D PTD Page 1 7/24/2012 8. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock and hang the BHA on a storm packer. 9. Change-out the tubing spool and 9-5/8" pack-off. 10. Sidetrack the well from —8520' MD and drill 8-1/2" hole to TSAG and run and cement 7" intermediate casing. r 11. Drill 6-1/8" production hole (Ivishak Z2A/Z1 B). • 12. Run and fully cement a 4-1/2" production liner. 13. Perforate the well (drillpipe). 14. Run a 4-1/2" completion. 15. ND BOPE/NU tree/freeze protect well/ RDMO well. Please find attached the 02-12D Planned Well Summary, directional plan and proposed completion diagram. If you have any questions or require any additional information, please contact me at 564-5271. 02-12D PTD Page 2 7/24/2012 Planned Well Summary Well 02-12D Well Producer Target Ivishak Type Objective API Number: 50-029-20277-04 • Current Status SI (the 02-12C leg nor perforated & never produced) Estimated Start Date: 10/01/12 Time to Complete: 40 Days Surface Northing Easting Offsets TRS Location 5950398 687641 804' FNL /4386' FEL 11N 14E sec 36 TSAG Northing Easting TVDss Offsets TRS 5947780 690352 -8357 3489' FNL / 1743' FEL 11N 14E sec 36 Northing Easting TVDss Offsets TRS Production 5946932 691092 -8985 4356' FNL /1025' FEL 11N 14E sec 36 Hole Target 5946612 691298 -8977 4681' FNL / 827' FEL 11N 14E sec 36 Locations 5945871 691646 -8976 151' FNL /498' FEL 10N 14E sec 1 BHL 5945171 691856 -8978' 856' FNL / 306' FEL 10N 14E sec 1 Planned KOP: 8521' MD/7387' TVDss Planned TD: 12,968' MD/8978' TVDss - Rig: Parker 273 BF/RT: 30'/46.95' RTE: 76.95' �t IV"^' 02-12D PTD Page 3 7/24/2012 Directional - Schlumberger (P7) KOP: 8520' MD Maximum Hole Angle: -36° in the 8-1/2" intermediate section -91° in the 6-1/8" production section Close Approach Wells: All close approaches occur in the reservoir section of the wells. Wells 02- . 03A & 02-21A are abandon CST's, the 02-03B is a producing Ivishak well which will be shut-in and fluid pack while drilling the close approach interval and the 02-12C leg has been Minor Risk at 1:1 to allow the placement of this 02-12D RST as a replacement well for this failed CTS. Survey Program: Sunray Tool Program Data 7'12012 From To 181 )R) Survey 4Wellborel 700102010e Descrptlon '"i!)S 8 520 9.1 1 •Camera Eased mag mut*Fo 102-12. ::A.&lAG-5,1:x, Carrera based mag multi aha 8.520.95 9,020.95 02-120 Plan 07 IPPen 02-120) INCSTREND Irxinometer•known azi trend 0.520.95 9.02085 02-120 Plan 107 1Plan 02-1201 GYD-GC-M5 Gyrodata gyrocon paseiry m:s 9.021 95 9.584 85 02-,26 Plan*710101-102--12p) rawU tAwO-5ran0.00 9,020 45 9,884 95 02.120 Plan 17 Pan 02.120) MWD-IFR+MS MWD-IFR.Witt Stabar 9,61.4.05 10,727.20 02-12D plan 07 Plan 02-120) 6550 LAND_sbnAard 9.184 95 12.968 72 02-120 Plan$T IPlan 02-120) MV+D-IFR+MS txwD-IFR+Mum Stanx Nearest Property Line: 42,200' Nearest Well within Pool: 600' Formation Tops & Pore Pressure Estimate Estimated Depth Fluid Most Likely Minimum Maximum Formation Formation Top Uncertainty Type Pore Pressure Pore Pressure Pore Pressure (TVDss) (+1-TVD k) )for sands) (EMW ppg) (EMW ppg) (EMW ppg) CM2 6,871 0 +1 20 10.00 9 70 10 40 KOP 7,380.0 Top of WhiosioCk N/A 10.00 . 9.70 10.40 CM1 7,553.0 +1-20 10 20 - 10.10 10.40 • THRZ 7,944.0 +1-20 10.30 • 10.30 10.60 BHRZ 8,146 0 +1-20 10 30 ' 10 30 10,60 • TPTR 8,211.0 */-20 Hydrocarbon 9.50 6 70 9.50 LCUtTJB 8,220.0 +1-20 _ 9.60 3 50 10.30 TJA 8,258 0 +1-20 9 60 • 9 CO 10.30 TSGR 8,357.0 +1-20 Hydrocarbon 7.20 6 80 7.80 TSHU 8,394.0 +1-20 710 6.80 990 TSAD 8,458.0 +1-20 Hydrocarbon 7-10 6.80 7.70 TCGL 8,646 0 +1-20 Hydrocarbon 7.10 6.80 7 70 BCGL 8,718.0 +1-20 Hydrocarbon 710 680 7.70 2358 8.785.0 +/-20 Hydrocarbon 7.10 8.80 7.70 22TS 8,836.0 44-20 - Hydrocarbon 7.10 6.80 7 70 21 TS 8,887.0 +t-20 Hydrocarbon 7.10 6.80 7 70 TZ1B 8.942 0 +1-20 hydrocarbon 7 10 6.80 7 70 PGOC 8.946 0 +1-20 Hydrocarbon 7 10 6.80 7 70 HO1 8,978.0 +1-20 Hydrocarbon 7 10 6-80 7 70 TDF 8,984.0 +1-20 Hydrocarbon 7 10 8.80 7 70 BSAD 8992(below pear.) +1-20 7.10 6.80 7 70 Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDrkb MD I TVDrkb 8-W 7" 26# L-80 VaHCop 7,240 5,410 1314' 8370'/7325' 9684'/8443' 6-1/8" 41/2" 12.6# 13C-85 Vam-Top 8,430 7,500 3435' 9534'/8301' 12,969'/9055' Tubing 41/2" 12.6# 13Cr-85 Vam-Top 8,430 7,500 8375' surface 9539'/8305' 02-12D PTD Page 4 7/24/2012 Mud Program Intermediate Mud Properties: FW LSND 8-1/2" hole section Depth Interval Density (ppg) PV YP API FL HTHP FL MBT PH KOP to 8-1/2" 10.4 5-20 20-25 <10 <10 <20 8.5-10.0 TD at TSAG Production Mud Properties: Reservoir Drill-in Fluid 6-1/8" hole section Depth Interval Density (ppg) PV YP LSVR API Fl pH MBT 7" shoe to TD 8.5—8.8 4-9 20-25 >13,000 NC 8.5-10.0 <3 Logging Program 8-1/2" Intermediate: Sample Catchers—as required by Geology Drilling: Dir/GR/Res Open Hole: None Cased Hole: Log & record LWD GR a minimum of 300' above the KOP (tie-in log)/ log 50' above a definitive correlation marker as part of the tie-in. 6-1/8" Production: Sample Catchers—as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 Intermediate Liner Basis: Lead: None Tail: Open hole volume (1164') + 30% excess + 80' shoe track + 150' 9-5/8" x 7" liner lap + 200' of 9-5/8" x 4" DP. Tail TOC at TOL at 8370' MD. Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12.5 ppg (Mud Push II) Volume: Lead N/A _ Tail 52 bbls, 293 cult, 253 sks 15.8 lb/gal Class G + adds— .17 cuft/sk Temp BHST= 183° F, B TBD by Schlumberger Casing Size 4.5" 12.6#, 13CR Production Liner Basis: Lead: None Tail: Volume of open hole + 40% excess + 80' shoe track + 100' of liner lap + 200' of 7" x 4" DP excess. Tail TOC: 8866' MD (cement at TOL w/excess to be circulated out) Total Cement Spacer 25 bbls of Viscosified Spacer weighted to 12 ppg (Mud Push II) Volume: Lead N/A Tail 88 bbls, 491 cuft�24_sks 15.8 lb/gal Class G + GasBlok + adds— 1.17 cuft/sk Temp BHST= 192° F, BHCT TBD by Schlumberger 02-12D PTD Page 5 7/24/2012 Surface and Anti-Collision Issues Surface Shut-in Wells: • There are no wells requiring surface shut-in in order to move onto the well. At surface, the 02-12 well is —60' north of the 02-35 well and —120' south of the 02-13 well. Close Approach Shut-in Wells: • Three off-set wells fail Major Risk analysis for their close approach proximities within the pay zone, however, all 3 wells pass Minor Risking at 1:200. Two of these wells (02-3A & 02-21A) are P&A'ed CTS's which are now buried under new CTS's and the other well (02-03B) is an active producer which will be SI and fluid packed for the drill-by. • The 02-12C leg of this sidetrack is currently Minor Risk at 1:1 which permits the close proximity drill-by in the pay zone of this well. Note: This well is in part, a replacement well for the02-12C "failed" CTS. • Note also, that the 3 Put River wells (the 02-27A and 02-23A producers plus the 01-08A injector) will be 4, SI while drilling intermediate section of this well. Hydrogen Sulfide DS 02 is not considered an H2S site. Recent H2S data from the pad is as follows: (6) H2S Data Well Naunq H2S Level Reading Date COMMOM Patent Well(if sidetrack( 02-120 N A NiA Suspended $1 Closest SHL Well HTS Level 02-35B 10 ppm 5712012 *2 Closest SHL Well H2S Level 02-13B 10 ppm 11312007 LIST producer $1 Closest BHL Well H2S Level 01-20 10 ppm 3;2212012 $2 Closest BHL Well H2S Level 02-030 10 ppm 2119/2012 $3 Closest BHL Well H2S Level 02-11A 8 ppm • 312012012 Max.Recorded H2S on Pad/Facility 02-25.4 22 ppm . 1130/2012 Other Relevant H2S Data OS 02 is not an H2S drilisito. All wells have.c100 ppm H2S • (1123 alarms from rigs,etc.) Faults • There are no mapped fault crossing for this well. Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659- 5893) f/guidance. 02-12D PTD Page 6 7/24/2012 Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 4000 psi. BOP regular test frequency for 02-12D will be 14 days during drilling phase (unless stipulated otherwise) and 7 days during de-completion and surface casing work. Intermediate Interval Maximum anticipated BHP 4056 psi @ TPUT at 8211' TVDss (9.5 ppg EMW) _ Maximum surface pressure 3235 psi (.10 psi/ft gas gradient to surface) Kick tolerance Infinite with 10.7 ppg frac gradient, assuming a maximum 9.5 ppg max pore pressure in the Put River sands with a 10.4 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi 9-5/8" Casing Test/7" 3500 psi surface pressure Casing Integrity Test—8-1/2" hole FIT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" drilling liner Production Interval Maximum anticipated BHP 3346 psi @ TSAG at 8357' TVDss (7.7 ppg EMW) Maximum surface pressure 2511 psi (.10 psi/ft gas gradient to surface) Infinite with 8.8 ppg frac gradient, assuming a maximum 7.7 ppg max Kick tolerance pore pressure in the Sag and 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 2,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Production Liner 3500 psi surface pressure Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel 02-12D PTD Page 7 7/24/2012 • • zY -I Cg m„ O U � z Z . ,, o g 5 = a . a 0CD CL.s Y a j ry CC 72 g OJ00 d $.6 .22- ,3 s Ix a < o.SzE gm mgm < mw <Q n hI x aB<� oXN!I ME PM- M s e ,t,;,71,„ U,71,„ }}a�� ® I l f I I n S I I aci�.ww - 'n�� .i>n� ca,>IN u7omm >,N i f3 F3 �3 8 z Uin x gmm ��,nm c z�n�n�- t � �amm� m�ninvv o a �A ���3 ���; _,77..7,7, l �.vin �i31��3 u s w 18 8 s , Il 1I i H b I ` I I $m ago > o y a o a. • WW WCW <0W m m . --- --- t7 U U t7 t7o W3 yp p UL__ — - z z z z z 0 N r m w-- ! A . fit- I I -L--- --- - dem m a:m m i 1 1 t 2 Emtn i ii 51_ FiPig “ II_ �,. }�.,,i� i i \ ags 0 — tJiP1 v 7 li'If1diA11 iIIChI = r 3 ,.. ns ----` R II ���Itil"Me9 d S 8 1 li IIt)Ills 1 =aaa<®®.1®® II I i \ g ief ss .a IIiiiir 1 0 5.8 I E I I [al fr-ng fr�ggg5.§l I ii �� s st&-airavuel �1 $ 0€ 3� aI 1 I 5-� «E�'�'c5�'LI 141 � z z11..f i to SS 4 �. ... .._ _.._ _.. 22777 �y £ Ili—._.—.—. -----= —..—.. .—.— ope Pc§li�?bb m-1 0 € 6 5�lrS vE$ e a m rc 4 g o 1,, m ,- I rc _ _ I Le.' W. 6. Z p .P .=.L., 082 U U aIAAA z. .m.m � yW ,-, OYf H1 x U Wel!plan Addendum Contingency for well control when non-shearable equipment is across the BOPE shear rams This document will provide guidance for rig operations when a well control event arises and there is non-shearable equipment hanging from the derrick across the BOPE shear rams. Prior to picking up or running any equipment or tools in the hole, a PJSM and discussion is required to identify and note any equipment which will be run through the BOPE and is non- shearable. A risk assessment shall be performed for any equipment which is deemed non-shearable. The risk assessment must address the following: 1. Can variable bore rams seal against the equipment? 2. Can an annular preventer seal against the equipment? 3. Is a cross-over readily available to make-up into equipment? 4. Is a single joint or full stand of DP readily available to lower equipment below the BOPE stack? 5. How the equipment can be intentionally dropped down hole. 6. Are weights of equipment known so that hydraulic jacking force of wellbore pressure can be calculated. 7. Accurate and up to date shearing capabilities for the current shear rams installed is available. 8. Has each crew member been versed on individual roles and responsibilities? If there is a well control event happens with non-shearable equipment across the BOPE shear rams, the following procedure should be followed: 1. Based on the risk assessment above, gain control of the well by either: a. Closing the appropriate preventer(pipe ram, VBR, or annular) or b. Placing a sealable piece of equipment across the BOPE and closing the appropriate preventer or c. Dropping equipment and closing the Blind or Blind/Shear rams. 2. If well conditions permit, contact appropriate personnel. If not,proceed with well kill operations. This may include placing shearable equipment(i.e. drillpipe)across the shear rams by stripping in/out of the hole. 02-12D PTD Page 9 7/24/2012 02-12D RST General Operational Summary Proposed Pre-rig prep work: 1. MIT-T to 3000 psi. MIT-IA to 3500 psi. MIT-OA to 2000 psi. 2. Perform a tubing punch just above the existing production packer at 9599' MD (tubing punch at-9540' MD) to allow fluid circulation to the IA at that depth and circulate the well to clean seawater on both sides of the tubing. 3. Place 500' cement plug from the top of the bridge plug at 9638' MD (on both sides of the tubing above the production packer at 9599' MD). (-35 bbls of 15.8 ppg G cement. Est TOC at 9138' MD.) 4. PT cement to 2500 psi. Ckc.ft 3DB 5. D&T cement/drift for jet cut on tubing. 6. Jet cut the 5-1/2" tubing at 8800' MD and freeze protect both sides of the tubing with diesel to 2000' MD. 7. CMIT-TXIA to 3500 psi. 8. PPPOT-T and IC. Function LDS. 9. Set BPV and test. • Planned Rig Work: �';• VI / y A I 1-; 1• ..L K e c' 1. MI/RU/confirm barriers. t� «/ 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high. • 3. RU and pull the 5-1/2", 17#tubing from the pre-rig jet cut at-8800' MD. 4. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at-8800' MD. 5. RU E-line and RIH w USIT/CCL/GR to 9000' and log to surface to determine TOC behind the 9-5/8" casing in the 12-1/4" open-hole (if any) and in the 13-3/8"x 9-5/8" OA(est. TOC -2250' MD). 6. RU E-line, RIH with GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at -8496' MD ft,p A (competent sand / confirm with GR) as required to avoid cutting a casing collar while milling the ( window. POOH. Rig down E-line. tZ -4 g37. Pressure test the EZSV to 3500 psi for 30 minutes and chart. 8. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 9. Hang the milling BHA on a storm packer and change-out the tubing spool and the 9-5/8" pack-off. (Above work approved per Sundry Permit#xxx-xxx.) 10. Mill a window in the 9-5/8" casing at-8520' MD' plus 20'-50 of new formation from mid-window. • V 11. PU into 9-5/8" casing. Perform a FIT. POOH for drilling BHA. i c-7 eh'' 12. MU & RIH with an 8-1/2" drilling BHA w/DIR/GR/RES/PWD and drill establish the sidetrack and drill to the TSAG target (may run gyro at -9000' to open-up the drillers target boundary in the pay sands / rip may require multiple BHA's to drill this interval). • 13. Circulate and condition the hole prior to TOH to run a 7" drilling casing/ 21Z.-104 14. Change upper VBR's to 7" casing rams and test to 250 psi low!3500 psi high.7 15. Run a 7", 26#, L-80 intermediate liner and cement to TOL (150' liner lap/ 15.8 ppg class G cement). 16. Pressure test the well/7" liner to 3500 psi for 30 minutes. • 17. Change out 7" rams to VBR's and test to 250 psi/3,500 psi. 18. MU a 6-1/8" BHA with DIR/GR/RES/Den/Neu with an insert bit and RIH to the 7" float collar and displace well to the planned 8.5 ppg DIF. - • 19. Drill out the 7" shoe plus 20'-50' of new formation. Pull into the 7" shoe and perform an FIT. YIi'P3 20. Drill the 6-W production interval as per directional plan to TD (may require multiple BHA's to drill this interval). 1 Jikvk 1. Circulatehole clean, shorttripas needed/MAD Pass where required. POOH.22. MU and RIH to bottom with a 4 1/2", 12.6#liner from TD to 150' liner lap inside the 7" shoe. 23. Fully cement the liner to the TOL with 15.8 ppg Class G Latex cement. 24. Set liner top packer and displace well to clean seawater above the liner top. 25. Pressure test the well/4-1/2" liner to 3,500 psi for 30 minutes. s' 26. RU DPC perf guns& RIH and perforate. • 27. RU and run 4-1/2", 12.6#, 13CR-85 Vam-Top completion.' 28. Space out and make up tubing hanger. • 29. Land the tubing hanger, and run in lock down screws. - 30. Reverse circulate to seawater(surface to surface w/corrosion inhibitor in annulus above the packer).. 31. Drop ball and rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes! 02-12D PTD Page 10 7/24/2012 32. Set a TWC. 33. ND the BOPE. NU the tree and test to 5,000 psi. 34. Pull TWC & reverse in sufficient volume of diesel to freeze protect the well to —2,200' MD (allow the diesel to U-tube to equilibrium). 35. Set a BPV. Secure the well. 36. RDMO. Post-Rig Work: 1. MI / RU slick line. Pull the ball and rod / RHC plug from landing nipple below the production packer. 2. Replace the DCK shear valve with a dummy GLV. 3. Install well house and instrumentation. 4. Modify S- Riser as required. 5. Perform negative pressure test on the 7" liner lap. 6. Perform well flow-back. 02-12D PTD Page 11 7/24/2012 02-12D Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Intermediate Hole - The planned 10.4 ppg mud weight for this interval of the well, there will be sufficient hydrostatic head to provide the following: 1. sufficient mud weight for potential cretaceous injection pressures (9.8 ppg max). -- 2. sufficient mud weight for Put River and Sag River pore pressure (9.5 ppg max). • 3. sufficient mud weight for HRZ and Kingak shale stability. B. Production Hole - The Ivishak in this area is expected to be under-pressured at 7.1 ppg EMW. This interval will be drilled with a 8.5 -8.8 ppg reservoir drill-in fluid. . II. Lost Circulation/Breathing A. Intermediate Hole - While no major lost circulation is expected in this interval of the well, breathing and/or lost circulation is a possibility on wells with KOP's from un-cemented casing. B. Production Hole - The lost circulation risk for this interval of the well has been characterized as"low". III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the kick tolerance for the intermediate section is infinite for both intervals of this well. B. Integrity Testing Test Point Test Depth Test type EMW (lb/gal) 9-%" window 20'-50' from the 9-%" window FIT 10.7 minimum 7" shoe 20'-50' from the 7" shoe FIT 8.8 minimum IV. Hydrogen Sulfide While there are no wells on DS 02 with >100 ppm H2S, operations should adhere to the guidelines in - the ADW"Hydrogen Sulfide" SOP. V. Faults - no mapped faults. VI. Anti-Collision Issues A. There are 2 P&A'ed CTS's (02-3A & 02-21A) and 1 active producing well (02-3B) which fail Major Risk analysis and have been Minor Risked at 1:200 to drill this well. B. The 02-12C leg of this well has been Minor Risk at a 1:1 to drill this well. Minor Risking this leg of the well at 1:1, basically means we are willing to "hit" this well as we drill this replacement well. C. 3 Put River wells (the 02-27A and 02-23A producers plus the 01-08A injector) will be SI while drilling the intermediate section of this well. CONSULT THE DS-02 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 02-12D PTD Page 12 7/24/2012 TREE= CAW 4-1/8"5K 02-12D WL _,ORE'S NOT SHOWN BELOW WHIPSTOCK WELLHEAD= FMC .,. ACTUATOR= Proposed RST KB.ELEV= 76.30 BF.ELEV= 30 KOP= 8521.20"CONDUCTOR — 80' Max Angle= 9194#,H-40, — ' — 2362' -195/8"FO CEMENTER Datum MD= x Datum TVD= 8800'SSD=19.124' 2490' H95/8"FO CEMENTER 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT H 2386' 13-3/8"CSG,72#,N-80 BUTT,ID=12.347" H 2702' I GAS LIFT MANDRELS 9-5/8"CSG,47#,N-80 BUTT XO TO J&L-95-HARD —I 7793' I ST MD TVD DEV TYPE VLV LATCH FORT DATE 1 3519 3500 4.5x1.5 shr 2 6028 5500 4.5x1.5 dmy 3 7967 7000 4.5x1.5 dmy 4 9229 8050 4.5x1.0 drry Minimum ID = - TOP OF 7"LINER —I 8370' 0 35 —9-5/8" whipstock set at 8496' MD in CM2 9409' —14-1/2"X NIP, ID=3.813" ' 1�1�1 �11111 ' 1111111 9429' —17"X 4-1/2"PKR I •11111111111111111111 1111111111111 1111111111111 9459' H4-1/2"XNIP ID= 3.813" 1111111111111111111111 111111111111 02-120 9529' H-1-1/2"XN NIP,ID=3.725" 1111 9539' -J4-1/2"TUBING TAIL 9-5/8"CSG,47#, -9855 \ J&L-95 HARD, ID=8.681" 4-1/2"TBG,12.6#,13Cr80,.0152 bpf,U=3.958" —I 9534' 7"LNR,26#,L-80 -J 9684' — PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF:"@' ^# Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2"12.6#,13Cr80 H 12969' I 02-12D DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/30/77 PKR 141 ORIGINAL COMPLETION 06/01/11 JL/PJC FINAL DRLG CORRECTIONS WELL: 02-121 11/15/95 N3S CTD SIDETRACK(02-12A) 07/24/12 jgr PROPOSED RST w p#7 PERMIT No: 06/22/07 N4ES CTD SIDETRACK(02-12B) AR No: 50-029-20277-0 04/26/11 NORDIC 1 SUSPENDED CTD(02-12C) SEC 36,T11 N,R14E 804'FNL&894'FIM 05/05/11 PJC DRLG DRAFT CORRECTIONS 05/29/11 PJC DRLG DRAFTCORRECTIONS BP Exploration(Alaska) .— I o 02-12D(P7)Proposal Report (Non-Def Plan) Report Date June 26,2012-09 38 AM Survey IDLS Computation Minimum Curvature l Lubeaa Client BP E0Pbraton Alaska Vertical Section Azimuth 142 546'(True North) Fie Piudhce .-EOA Vertical Well Structure 00212/Oz�Feaslblli / Study TVD TVDRalen ce!nee Elevati6103 tion 76950ft above MSL Borehole 02-120 Seabed I Ground Elevahon 30 000 rt above MSL UYM IAP6 Unknown/Unknonn Magnetic Declination 20613' Survey Name 02-120(P7) Total Fled Strength 57654 630 nT Survey Dale June 19,2012 Magnetic DO Angle 11 044• Ton I AHD/D0IIERD Ratio 17437V/687415711/623437V/68741578/6234/0759 Declnatin Data November 01,2012 Coordinate Reference System NA027 Alaska State Plane,Zone 04,US Feet Magnetic Declination Modal BGGM 2011 1-mailman Lal I Long N 70.16955653",W 146'265681928' North Reference True North Location Grid N/E FIX N 5950398 100/WS,E 617641 240 RUS Grid Convergence Used 0000' CRS Grid Convergence Angle 142149265' Total Corr Mag North-aTrw 20513' North Grid Scale Factor 099994 Local Coond Referenced To Wel Head Exclusion Zone Comments MD Inch Azim True NDSS TVD MSEC NS EW TF DLS Directional Exclusion Zone Northing Basting le In) (*) r) (8) (n) IRI (n) Oa Cl ('/100X)Difficulty Index Alert AFI (NUS) (NUS) To-In Survey 845495 3550 142 CO 732062 739757 313403 -232128 212344 HS 031 539 4077 594913062 669/2175 14111 13 3550 11200 734600 742215 315214 -233555 213451 HS 000 531 4077 564/11663 11913325 650000 3550 14200 735729 743424 316019 -234190 213955 HS 000 540 4077 5/4811041 6/963637 Top M Whipstock 6520 95 35 50 142 00 7374 35 7451 30 3172 36 -2351 41 214704 451. 003 540 40 77 5941101 01 689646 09 Base M Whipstock 653695 3700 13956 738725 746420 311111 -235881 215302 MS 1300 541 4194 5/4/09354 88965226 Cry 4/100 8556 95 37 CO 13156 7403 22 746017 319383 -2367 97 2160 63 126 791. 000 5 41 41 94 5946064 N 689160 29 6660 00 35 94 137 27 7437 65 751410 321935 2367 11 217710 126951. 400 543 40 82 594/06617 669677 74 8700 00 33 67 131 50 7519 98 751693 327580 -2427 04 221149 122 21. 4 CO 5 46 37 66 59419027 26 689919 41 CMI 173641 3215 12103 755300 762165 329116 -244104 223501 120 141. 400 547 3654 594/0136/ 6//13627 8800 CO 31 69 12505 760417 7661 12 3326108 -2460 51 2260 75 118 771. 400 549 34 88 5947904 87 619962 51 End Cry 8871 65 30 50 120 03 7865 53 7742 41 3382 63 -2410 41 2281 94 HS 400 5 51 33 02 5947975 75 689194 16 8900 CO 30 50 120 CO 7689 98 7786 91 337612 -2417 61 2304 40 HS 000 5 51 33 02 594799//6 696006 79 9000 03 30 50 120 CO 777612 7653 07 3422 99 -2512 91 234436 HS 000 5 52 33 02 5147944 59 616051 36 9100 00 30 50 120 00 7862 28 7939 23 3469 86 253136 2362 31 HS 000 5 52 33 02 5947920 32 690095 93 THRZ 119414 3050 12000 764400 102065 351132 -256243 243100 HS 000 553 3302 5147/9730 61013120 9200 03 30 50 120 00 794145 8025 40 3516 74 -2563 74 2436 26 HS 000 553 33 02 594789e 05 810140 50 9300 00 30 50 120 00 8034 81 8111 56 3563 61 -258911 2450 22 HS 000 554 33 02 5047871 78 490115 07 940000 3050 12000 812077 819772 381049 281449 252417 MS 000 554 3302 5/4784751 690229 84 TOLD 142121 3050 12000 814600 122215 362421 -2121 92 253704 HS 000 551 3302 51/7/4040 61024270 95X00 30 50 120 00 8206 93 8283 88 365736 -283917 256913 MS 000 555 33 02 5947823 23 1190274 22 TP712 950472 3050 12000 121100 121785 365157 -264107 257020 HS 000 555 3302 51471220/ 19027632 LCU/TJ8 1515/6 3050 12000 822000 129115 366447 -294372 257479 HS 000 555 3302 5147/1155 19021017 7..14 157017 3050 12000 126100 134415 361051 -265715 2599 21 HS 000 555 3302 5/17/0603 61030510 980000 3050 12000 829310 537005 370423 -255524 281209 HS 000 555 3302 594779896 69031879 750R 167417 3050 12000 635700 143315 373100 -261107 264411 HS 000 556 3302 514771016 61035114 Curve5/100 967990 3050 12000 8361 94 843889 3741 W -265552 264720 33496 000 558 3302 5/4777957 81035440 ]' 1664 17 30 68 120 23 136561 844256 3743 61 211611 X1908 33 215 500 556 33 22 5947778 53 610356 30 970000 3134 12107 837918 845813 375126 269077 265810 32556 500 557 3396 594777454 89036342 TSHU 171712 3201 12195 839400 647015 375111 261555 216310 31130 500 557 34 If 594776196 6/037134 1540 171431 3540 12545 645100 853115 310026 -2719 31 261111 2811R 500 560 3852 514771710 61040743 060000 35 65 125 68 846157 6539 52 3603 35 -2721 21 2702 07 28 726 500 550 35 79 5947745 26 49041014 WOO 00 4009 12941 654150 861845 386167 -275867 275085 25786 500 563 4364 594770902 49045963 10000 CO 4464 13251 861536 160233 392866 -260249 280146 23496 500 566 4851 59478660/ 49051153 TCGL 1004361 4669 13371 864600 872295 395956 -212429 212433 2285R 500 517 5065 5//764526 61053412 1011000 4926 13513 888363 579358 4000117 -285350 215412 2119R 5O0 549 5341 594781851 69056543 BCGL 1015106 5171 13641 171100 179415 104230 -211340 211321 20196 500 570 5606 511751764 6/051526 10200 CO 53 93 137 42 8745 74 1422 69 4076 74 -211015 2906 22 20 27R 500 572 5131 5047561 53 490620 92 2355 1026142 57 11 13115 676500 116195 413511 -2152 71 2146 42 19 460 500 5 74 61 72 5/4751186 61066017 1030010 58 63 139 44 5101 24 617819 4161 67 -2972 38 296336 1915R 5 00 5 75 63 23 5047500 70 510677 5g 2275 1037015 6115 14075 613600 89/295 422254 -301112 300243 1156 500 577 6661 5/4745/15 69071711 10400 03 63 37 141 28 8149 71 892666 4249 04 -3039 73 301911 15 208 500 578 6115 5947434 76 49073500 21TS 1048911 6765 14260 811700 114315 433010 -310421 306146 17635 500 510 7251 5/4737111 61071664 10503 00 68 13 142 96 611977 4967 72 434019 -311181 307506 17 576 500 5 81 73 07 5947364 22 490792 72 1060000 7290 14451 692412 900107 443441 315770 313077 17046 500 564 7801 594728663 8065030 T2121 1069494 7611 14555 114200 901115 441115 -324057 316772 16775 500 585 1131 5/4723770 61011156 PG0C 1068410 7613 14510 814600 102215 451550 -325435 317712 16715 500 586 8215 5/4722416 61089830 1070000 7769 14604 894949 902544 453099 -326720 318582 18666 500 5th 6294 5147211 53 %090731 loam co 8248 14741 88671 904366 462920 -334957 323979 18416 500 519 8757 594713054 49018332 End Cry 1063495 8416 14798 497077 904772 466377 3371112 325a32 HS 500 590 860 5947101 56 6/0/5257 1090000 8416 14796 897739 905434 472819 .343378 329263 MS 000 591 498 594704767 49101824 HOT 1010517 8416 14788 897100 905495 473410 -343182 32957/ HS 000 511 1910 594704272 6/102151 CIV 5/1C0 109128 8418 14798 897870 905565 474096 .344465 329643 1913R 000 591 860 594703897 49102531 TOF 1098725 1767 14120 898400 906095 181170 .350794 333108 11049 500 593 8676 594697467 69106552 11000 00 88 28 149 41 1914 45 9081 40 4827 35 351890 334 58 19 030 5 03 5 94 8814 594696119 81072 30 End Cry 11036 49 9000 150 00 8965 00 9061 95 4663 55 -3550 40 3362 99 05 500 595 5436 5944932/5 491091 41 02-1213 TOTS 11X749 9000 15000 896500 938195 416454 355127 338349 52191 003 595 1436 594493200 49101200 End Cry 11058 91 91 26 148 37 864 43 9061 38 491562 3565 43 3349 83 HS 4 00 599 9330 594688/51 49111943 1110000 9126 14137 88419 906114 492665 363187 331564 HS 000 598 1330 591687922 8112547 Possible Mgrietc 1120000 9126 14137 496199 905594 502610 349000 341x06 HS 000 597 8330 59/79543 491180 CO imafk.....e Start 11300 X 9128 1437 87979 905874 512555 .377513 350049 HS 000 599 6330 594671184 80123453 Cry 3/100 1134197 9126 14137 497667 905562 516730 381015 352219 9525R OX 599 6330 594167841 49125741 11403 00 91 10 150 11 877 67 9054 49 5224 93 -3830 71 355216 95 266 300 8 00 93 25 5048617 36 49121.5 31 022-120 TGT2 11436 53 91 CO 151 20 4977 00 9353 95 5261 09 3492 54 357005 196 626 300 6 01 6322 594896 CO 491307 00 115X00 9065 15307 87609 905304 532386 394815 351972 103646 300 802 5335 59484066 49133805 11800 CO 90 09 156 02 4975 44 9052 39 5421 46 4061 93 3642 69 100 069 300 604 6356 5946451 48 49134326 End Cry 1162748 8994 15683 197543 905239 514114 408411 365361 HS 300 805 6363 5/4642658 49139487 Possible Mgrietic 1170000 894 15663 597550 905245 551842 413079 365222 HS 000 606 6363 59463864 49142505 interference End 11800 CO 894 15663 897561 105256 561533 122271 372156 HS 000 607 6363 5946269 73 49146888 11900 CO 894 15683 897571 905266 57t224 43148 376091 HS 000 606 6363 5/4317851 49150630 12030 00 49 94 156 83 875 81 9052 76 556015 4406 59 390025 HS 0 00 6 49 93 63 594108719 89154992 1210003 894 15663 87591 905219 590606 449552 363960 HS 000 610 5363 594599697 49159155 Crv3/100 1213151 8994 15683 817595 905290 593666 452756 385203 N946 000 610 NB 594596125 491848 1220000 8993 15861 87599 905294 600265 459092 387761 19946 300 812 9337 5945905 55 49163205 02-120TGT3 1223727 9000 16000 497600 905295 603631 462582 349090 91 526 300 6 t2 1323 594517100 49164600 123000 1995 t6161 87603 905291 601753 486511 391138 91 52R 300 814 9301 594581224 49166796 124X00 5957 16465 497618 905313 619128 47892 393994 91 516 300 615 828 594571718 49149893 End Cry 124725 8982 11690 597637 905332 62`.303 464813 395831 MS 300 817 8278 5945652 40 49171694 125800 8982 16190 497647 905342 626286 487502 39638 HS 000 917 6276 5/4562049 49172516 1260000 852 16690 197679 905374 637397 497543 391947 HS 000 615 6276 594552390 4917825 12700 CO 852 189 90 597711 9054 06 1485 07 -5072 93 400914 HS 000 6 19 82 76 5145427 t0 491775 34 Cm 3/103 1273882 812 16690 87723 905418 650044 511064 401794 90181. 000 611 8276 594539953 49171505 1288 00 89 61 165 06 0977 43 9054 36 6556 57 -5149 49 4032 76 90151. 3 00 6 21 82 93 5945330 56 8181 38 12900 00 89 8 162 06 8977 76 9054 71 6649 91 5265 8 406106 90141. 3 00 6 22 63 22 5945235 40 49183205 02-120 TGT4/TO 1296872 898 1800 897800 • 905115 871509 533088 401940 HS 300 623 8343 504517100 49155600 Drilling Office 2 5 1100 0 Prudhoe Bay Unit-EOA\DS-02\02-12\02-12D\02-12D(P7) 7/24/2012 3-32 PM Page 1 of 2 Comments MD Incl Aeim True TVOSS TVD VSEL NS EW TF OLS Directional In nal EaeluaExclusionEncluspnZone n Zone Arae Northing EaatnO (ft) C) C) (ft) 1N1 8t) 91) (NCI I rHDifficultylr000)Difficulty Alert r] (MS) )NUS) Survey Type Non-Del Pen Legal Description Northiro In East=M 621 Surface 44757 FSL 43860 FEL S30T11N R140 UM 59503915 100 087641 263 Tie-In 2414 FSL 2458 FEL 38T11 R14EUM 5016385020 600810780 02-1241011 924 FSL 1025 FEL 38T11N R14EUM 5048032000 0010.92000 02-1241912 582 FSL 816 FEL 36T11 R14EUM 5048598000 601307000 02-124103 5129 FSL 408 FEL 1 T10N R14EUM 5045871000 001848000 02-1241)1464 4424 FSL 306 FEL 1 T10N R14EUM 5945171 000 001856000 881 4424 FSL 306 FEL 1 T10N R14EUM 5045171 000 001858000 • Dnlling Office 2.5.1100.0 Prudhoe Bay Unit-EOA\DS-02\02-12\02-12D\02-12D(P7) 7/24/2012 3 32 PM Page 2 of 2 by 0 Schlumberger YVELL 02-12D (P7) FIELD Prudhoe Bay Unit- EOA STRUCTDRE DS-02 Magnetic Parameters Surface Load. N4027 Alaska Stile Pore.Zone 04.LU F. Miscellaneous Model. EGGM 2011 Do. 81044• Dete: November 01,2012 Lat.. N 7016 9.557 No.. S950928.7011LIS God Cony.1.428492851 Stet. 02-12 TVD Ref: 800(76.956 above MSL) Meg Dec'. 2.813- FS'. 57654.6nT Lon: W1402856.819 Ease. 68764124 BUS Scale Fact 0.89994000 Pen'. 02.120(P7) Soy Date:June 19.2012 2000 2500 3000 3500 4000 4500 5000 ••-12 Tie-In Survey Top of Whipstock Base of Whipstock Cry 4/100 -2500 ,,,,,,End Cry -2500 r• N Curve 5/100 -3000 -3000 02-1 nd C ..Cry 5/1 -3500 ••- E11dC 3500 A Z 02-12•TGT1 dCry Crv3/ '0 O .02-12r GT2 Lc) II 02 -4000 4- nd. - -4000 TO CO V V -4500 3100 -4500 -12DTeT3 •Cry -5000 - -5000 ry 3/100 02-120(P7) -5500 •••- -5500 02-12D TGT4fTD 2000 2500 3000 3500 4000 4500 5000 «< W Scale=1:500(ft) E >>> C. CID C. o o o o = » = o co= o C ~ i ( of - ) .... & \ / ~ / !! t [\ 2 !! ! oo ° ' t op ooco § /� / )i! ` . \ , _ • ) \ / !a| ° ,-. 0 O \)3 LU ! 2 . a _I - = 2 \ & q \ §! = S J .. ...6. . )|a ° :2, -& } ea CO I! e 2 § o . 228 / ° §§ r !ate 8 ( Ii fa 0 � k \ / . . . ° k ` k 7 2n�. �i7 ) $ .. § !, / / a.. , J )t $ 12 &!R.CL n . m M a) a) C CV d 3 . eS a �i1. . o .... . 4at| -� —, o 8 •j -7/fes n -2 RO o o o o o Umil=m@SOU_ 95- Project: Prudhoe Bay - Site: PB DS 02 Well: 02-12 Wellbore: Plan 02-12D 90— Design: 02-12D Plan#7 65- 1 80- 75— 70— _ 65— _ 02-12/02-12 c 55- 0 co 0- - 0 50— N - U 45— O - N - 40- 35— 30- 25— _ 20— _ 15— , 10— _ 02-12/02-12 0- 25- 20- 15- 10- 02-12102-12 5— 0 Q' ii02.121 i r r 1 z i a l i l i 0271/02-12DPla�r 4161 1 1 1 , 1 1 1 1 l i f t{t2112(02 f2k}R1eftl6 r i ( i r 8500 8550_ 8600 8650 8700 8750 8800 8850 8900 8950 9000 9050 9100 9150 9200 Measured Depth (100 ft/in) BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: Parker 273 @ 76.95ft(Parker 273) Reference Site: PB DS 02 MD Reference: Parker 273 @ 76.95ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-12 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-12D Database: EDM.16-ANC Prod-WH24P Reference Design: 02-12D Plan#7 Offset TVD Reference: Offset Datum Reference 02-12D Plan#7 Filter type: GLOBAL FILTER APPLIED All welipaths within 200'+100/1000 of refer Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 8.520.95 to 12.968.72ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,492.18ft Error Surface: Elliptical Conic Survey Tool Program Date 7/3/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 740.95 8,520.95 1 :Camera based mag multi sho(02-12) CB-MAG-MS Camera based mag multi shot 8,520.95 9,020.95 02-12D Plan#7(Plan 02-12D) INC+TREND Inclinometer+known azi trend 8,520.95 9,020.95 02-12D Plan#7(Plan 02-12D) GYD-GC-MS Gyrodata gyrocompassing m/s 9,020.95 9,684.95 02-12D Plan#7(Plan 02-12D) MWD MWD-Standard 9,020.95 9,684.95 02-12D Plan#7(Plan 02-12D) MWD+IFR+MS MWD+ IFR+Multi Station 9,684.95 10,727.20 02-12D Plan#7(Plan 02-12D) MWD MWD-Standard 9,684.95 12,968.72 02-12D Plan#7(Plan 02-12D) MWD+IFR+MS MWD+IFR+Multi Station Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-03-02-03-02-03 11,600.00 11,000.00 1,196.96 1,118.56 80.73 Pass-Major Risk 02-03-02-03A-02-03A 12,300.00 11,850.00 957.94 1.050.13 -92.22 FAIL-Major Risk ,.....-- 02-03 /02-03-02-03B-02-03B 10,780.93 12,566.00 400.20 1,112.79 -712.60 FAIL-Major Risk 02-04-02-04A-02-04A Out of range 02-11-02-11-02-11 12,968.72 11,400.00 1,434.52 452.97 1,003.02 Pass-Major Risk 02-11A-02-11A-02-11A 12,968.72 11,400.00 1,434.52 855.00 615.80 Pass-Major Risk 02-12-02-12-02-12 8,986.90 8,975.00 67.81 154.48 -86.11 FAIL-Major Risk 02-12-02-12A-02-12A 8,986.90 8,975.00 67.81 154.59 -86.22 FAIL-Major Risk 02-12-02-12APB1 -02-12APB1 8,986.90 8,975.00 67.81 154.51 -86.15 FAIL-Major Risk 02-12-02-12B-02-12B 8,986.90 8.975.00 67.81 154.31 -85.94 FAIL-Major Risk 02-12-02-12C-02-12C 11,445.16 11,750.00 8.07 125.19 -112.16 FAIL-Major Risk 02-13-02-13-02-13 Out of range 02-13-02-13A-02-13A Out of range 02-13-02-13B-02-13B Out of range 02-13-Plan 02-13C TEST-Plan#8 02-13C Out of range 02-21-02-21-02-21 12,793.94 11,575.00 462.60 412.74 60.08 Pass-Major Risk 02-21-02-21A-02-21A 12,941.01 11,700.00 416.66 425.18 -5.43 FAIL-Major Risk 02-21-02-21B-02-21B 12,824.98 11,475.00 639.54 409.35 236.52 Pass-Major Risk 02-34-02-34-02-34 10,000.00 10,375.00 1,356.02 460.49 911.88 Pass-Major Risk 02-34-02-34A-02-34A 10,000.00 10,375.00 1,356.02 461.83 910.53 Pass-Major Risk 02-34-02-34APB1 -02-34APB1 10,000.00 10,375.00 1,356.02 461.83 910.53 Pass-Major Risk 02-34-02-34APB2-02-34APB2 10,000.00 10,375.00 1,356.02 460.49 911.88 Pass-Major Risk 02-34-02-34B-02-34B 10,000.00 10,875.00 789.20 453.76 405.63 Pass-Major Risk 02-35-02-35-02-35 9,738.37 10,768.00 988.77 461.70 761.13 Pass-Major Risk 02-35-02-35A-02-35A 10,157.77 11,630.00 306.83 503.92 126.13 Pass-Major Risk 02-35-02-35B-02-35B 9,863.29 11,275.00 790.17 464.95 496.62 Pass-Major Risk ! PB DS 05 05-08-05-08-05-08 Out of range 05-08-05-08A-05-08A 12,916.70 12,625.00 1,316.57 403.87 912.72 Pass-Major Risk 7/5/2012 9.51:15AM Page 2 of 3 COMPASS 2003.16 Build 73 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: Parker 273 @ 76.95ft(Parker 273) Reference Site: PB DS 02 MD Reference: Parker 273 @ 76.95ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-12 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-12D Database: EDM .16-ANC Prod-WH24P Reference Design: 02-12D Plan#7 Offset TVD Reference: Offset Datum Reference 02-12D Plan#7 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 8.520.95 to 12,968.72ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,492.18ft Error Surface: Elliptical Conic Survey Tool Program Date 7/3/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 740.95 8,520.95 1 :Camera based mag multi sho(02-12) CB-MAG-MS Camera based mag multi shot 8,520.95 9,020.95 02-12D Plan#7(Plan 02-12D) INC+TREND Inclinometer+known azi trend 8,520.95 9,020.95 02-12D Plan#7(Plan 02-12D) GYD-GC-MS Gyrodata gyrocompassing m/s 9,020.95 9,684.95 02-12D Plan#7(Plan 02-12D) MWD MWD-Standard 9,020.95 9,684.95 02-12D Plan#7(Plan 02-12D) MWD+IFR+MS MWD+IFR+Multi Station 9,684.95 10,727.20 02-12D Plan#7(Plan 02-12D) MWD MWD-Standard 9,684.95 12,968.72 02-12D Plan#7(Plan 02-12D) MWD+IFR+MS MWD+ IFR+Multi Station 7/5/2012 9:31:25AM Page 2 of 4 COMPASS 2003.16 Build 73 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-12 Project: Prudhoe Bay TVD Reference: Parker 273 @ 76.95ft(Parker 273) Reference Site: PB DS 02 MD Reference: Parker 273 @ 76.95ft(Parker 273) Site Error: 0.00ft North Reference: True Reference Well: 02-12 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 02-12D Database: EDM .16-ANC Prod-WH24P Reference Design: 02-12D Plan#7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB DS 02 02-03-02-03-02-03 11,600.00 11,000.00 1,196.96 1,118.56 80.73 Pass-Major Risk 02-03-02-03A-02-03A 12,447.43 12,050.00 930.64 62.68 924.61 Pass-Minor 1/200 02-03-02-03B-02-03B 10,780.93 12,566.00 400.20 65.22 393.76 Pass-Minor 1/200 02-04-02-04-02-04 Out of range 02-04-02-04A-02-04A Out of range 02-09-02-09-02-09 Out of range 02-09-02-09A-02-09A Out of range 02-09-02-09APB1 -02-09APB1 Out of range 02-11-02-11-02-11 12,968.72 11,400.00 1,434.52 452.97 1,003.02 Pass-Major Risk 02-11A-02-11A-02-11A 12,968.72 11.400.00 1,434.52 855.00 615.80 Pass-Major Risk 02-12-02-12-02-12 8,520.95 8,500.00 0.00 0.91 -0.91 FAIL-NOERRORS 02-12-02-12A-02-12A 8,520.95 8,500.00 0.00 0.91 -0.91 FAIL-NOERRORS 02-12-02-12APB1 -02-12APB1 8,520.95 8,500.00 0.00 1.07 -1.07 FAIL-NOERRORS 02-12-02-12B-02-12B 8,520.95 8,500.00 0.00 0.91 -0.91 FAIL-NOERRORS 02-12-02-12C-02-12C 8,520.95 8,500.00 0.00 0.61 -0.61 FAIL-NOERRORS 02-13-02-13-02-13 Out of range 02-13-02-13A-02-13A Out of range 02-13-02-138-02-13B Out of range 02-13-Plan 02-13C TEST-Plan#8 02-13C Out of range 02-21-02-21-02-21 12,793.94 11,575.00 462.60 412.74 60.08 Pass-Major Risk 02-21-02-21A-02-21A 12,900.00 11,650.00 416.46 65.65 389.08 Pass-Minor 1/200 02-21-02-21B-02-218 02-21B 12,824.98 11,475.00 639.54 409.35 236.52 Pass-Major Risk 02-34-02-34-02-34 10,000.00 10,375.00 1,356.02 460.49 911.88 Pass-Major Risk 02-34-02-34A-02-34A 10,000.00 10,375.00 1,356.02 461.83 910.53 Pass-Major Risk 02-34-02-34APB1 -02-34APB1 10,000.00 10,375.00 1,356.02 461.83 910.53 Pass-Major Risk 02-34-02-34APB2-02-34APB2 10,000.00 10,375.00 1,356.02 460.49 911.88 Pass-Major Risk 02-34-02-34B-02-34B 10,000.00 10,875.00 789.20 453.76 405.63 Pass-Major Risk 02-35-02-35-02-35 9,738.37 10,768.00 988.77 461.70 761.13 Pass-Major Risk 02-35-02-35A-02-35A 10,157.77 11,630.00 306.83 503.92 126.13 Pass-Major Risk 02-35-02-35B-02-35B 9,863.29 11,275.00 790.17 464.95 496.62 Pass-Major Risk PB DS 05 05-08-05-08-05-08 Out of range 05-08-05-08A-05-08A 12,916.70 12,625.00 1,316.57 403.87 912.72 Pass-Major Risk 7/5/2012 9:31:25AM Page 3 of 4 COMPASS 2003.16 Build 73 Project: Prudhoe Bay Site: PB DS 02 Well: 02-12 Wellbore: Plan 02-12D Design: 02-12D Plan #7 Whole well path Scan interval 25 ft Scale 1 : 50 Wells minor risked as per report 0 175 330 30 150 - 12 r 101 300 1�r-_-------:+4,- 1111 \ ��_�` ,s , 60 rel 41 1 02-12/02-12C \\,W1:241 T ,.11104 11 ' \-- �y ,41110: ,aas ' a97 11478 \\ - �11as7 A loy 270 \ 90 \ //' r`//I 114 .:1.•.1. \ V_ 400 1 ' 8842 11381 76054 �\� \ \ \/if 8:1 51 \ 1,), • O`1tt)Ti 89873 �i�r ••011 if�� .. 84 •so6a r 2 , ,. %9109 240 ` I�0 ` '� � � °9157 120 10..44120- 79 ,..32 3 12 ' '93 6 / :::' `'....:19 02112(O028PB1 150 210 150 175 180 Travelling Cylinder Azimuth(TFO+AZI)[O]vs Centre to Centre Separation[50 ft/in] Project: Prudhoe Bay Site: PB DS 02 Well: 02-12 Wellbore: Plan 02-12D Design: 02-12D Plan #7 8500 to 9685 ft Scan interval 25 ft Scale 1 :50 Minor risks applied as per report 0 175 330 - 30 150 12 ' 300 60 75 51 270 90 e9 °8842 8865 8890 :•14 89 1 8963 '8987 •011 °90•• 9060 9084 9109 240 `' 120 9157 9181 0$ 9206 0 , 925 --9279 ,.392303 7 12 93" 9376 9400 02-12102-12CP61 150 210 150 175 180 Travelling Cylinder Azimuth(TFO+AZI)[°]vs Centre to Centre Separation [50 ft/in] Project: Prudhoe Bay Site: PB DS 02 Well: 02-12 Wellbore: Plan 02-12D Design: 02-12D Plan#7 9685 ft to TD Scan interval 25 ft Scale 1 : 50 Minor risks applied as per report 0 330 1 �' 1114304 jail I 11. 11111 II Ala .' 4011 �► 11 \3430 llWititir 75 �,1' hill 6° i if,' ' , ii4 : s0\ 2 \AM0\\R*\\\ §§i 270 ,f NOISS* , , 90 � 2 fkl, iSi‘f , llr 5, j 1\44P 2%\ * ,A 120 i tO 411 4 01 ,,� � 150 210 150 180 Travelling Cylinder Azimuth(TFO+AZI)[O]vs Centre to Centre Separation[50 ft/in] OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME j Com( 02- PTD# -'cam--- /( (7i Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD:- rt 1 -e- ��4 POOL: -t-J/tom- Zce,y C t Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well _ . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 u) D 0 U To N o Lo co a N E O o @ m co , � a) v a I. i v7s 7 1E,, , co N i Lu• u) 2. a v o, a ° _ N, m (r,oy - �, O, a) Lc)' Qof o ov o)o o � 3 a `a w -o M, T CM C N = 4) a , MLO O a) N, aE), 3. co c, � H 5, - 3. • p. u-i N, _, x, E m, m.a a) a a) _ a y a o, N, a) r, = o g - u1 O' t, C w L. N CV E.. a), co. N I a) I— co. O o, — z , ao: , O o g' 3 m, � rn 0 M to y N N c a c, a), 7 a) a= -, y, 3, a • 3 3 c n a� o a) c w > p 0 a as csi v a)' M, ai CO' c a' a ca _' a y, U) w ' O: c ° N ~ cn f0 c y a v c m N, o 4 t H = o ac) p c. E, 3, n', N N o c, � m ay a) v 2 co p. CD, a N 0. N, C, C, O: C, a, N, C :: O a), a' °, U N D N a) c: L, O' O c U, i, a), a) a): m, y, O: N, 1 U 4 a) N • CO c 0_ H, a)' c0, cn > y, E, o, a h N, s 3: �, N y a WI - a, a: o, D a) O) S. N =, a y, y, Q) c, L, _, ai a, .> D..', p }' N, O, c N w, c. w„ N 'y. U, a 7, 'a O) a) a Q' 7,, L N. •ca C y, .D. @ D <a, __CO, = N, Lt)' M, (0132 �, L' 0 G 6 o O4 W, CC, x N gyp, 'wD,, �, 0 o, C, �, M �, v u . c rn E a) Q, a), a), O c0' U' O' ,; N U' >' v' E 4 M' N' . a) Oto co C7 , ., O 4 �, U a) o' •� `a)' ca r). . Ca E v) i�, Y, c � 3' a) .0 Z CI p M, O, 7 U U 7, _' co co E. .c o _C a 0 N' E 7 U C a) "O CO CO, v' L , X, X O U' a), O, "O N a)• p N, O a). a, a) O w , � a �, w, o, O in in a` v ca a' � 2 �' M, . _, , co c a v a > , , , , , , , , m p , , Ce ej U) W CO. (0 U) N W CO N (0 N 0) co co (0 co c co co U) co co. co. co Q Q a), 0,, 0,, a), a), a), a), a), N, a), O a), <, <, < < < < O, a), a), a), a), a), <, a), a), a), a). a), a), < o, a), Q, Q Q a z; z; >- >- >-, >- >- >- >-, >- >- >- >- >- z z z; z z, z; z >-, >- >-, >-, >-, z, }, r, >- >- }, }, z z, >-, z, z z t >. .1) 1,9 ^ o T P a), E, 3, E. a) • c N, c , , , o .o O. a c U oa), 3, E. 3 o V • p, O Z, Y, a), E. m cu O '? . O. C u_ C' '1 t, co z CO 7 C,CY 70 u), 0 CD iNek) D 4c ay d .0 V' O, 1 y, co. C' Of V a) a)' Q' • 'C' D N v, m v �. aS o, N as ai m y 1 a C 7, Z. C, �, •"' N C.. 'O, W O. 7, O L' C a) _' N' N' a) K) a3' 0 , N a) C, N 7 i, 3 > a) �, o, c, m � 4 7, o. a v, w, 7• o, m U 0, t, ID'S , V, �, N, cu E. 3 ,_ �: C' O) L. o2S. C' o' 7 O, L) 7, Q, N, y. 0, a) 0 W -z "O; O' v, 0 a). a O, C, co, coO a), d, L. , C, O, C ,-, co! 1.1-;,..,i O M' E E •c, v, E, c, E, c�a o o =, a,, H c o ' as a3 a c, a), w d' a N L a C C o 12 Q o o v 7 o v' m c' 3' O a' e. as U = o o a)' vi 0 T 4- C c @, m, N o O c 0 m 7 ci 'm 9 4 m o ;; a 3 > as �, O C O' 6 a p p N (0' o O N .d f0 ‹C' f`6 2, W •O O O) O N a) W g E a U U t. L, a) m 3 v — a o _ 7 'a 3 a a a) L m c w 3 o• a Q u) =c7 4 c c @, .n, 7 c, cm 0, a 3 o V c E E, @ •O, O, O, W O O, v a) .- c co, M, co L, a) 0, O, C, > c a) in _v • a a .3 3, av), a m_, v v) '0 =,, 3 m E. o O. m U 4 °)' u' o '3 « L.m' m o w o d• • C' , N N, -0: v, N O 5 o. N' >O aY E' �O O Q' 0' E N O O' uJ' 9 E N O E L_ O O a) a ,co' y C U f' O' C)' a v N' N' L U' P 7 7' a c V U ' O- 0 w - v a) ,- N' f`' E' m O' . fn .. 7' o O C L 06 < U a a), a a O d, a a) a a a) a). , '0 C. U 3, N, "6 N' VY -O ga U, f0, E.. O, 0, 0, N 3. co m N, N. ° r, _C O) Oal c, 77r a) U a u) a' p N '6 v, 2. c N: •y, O O_ N • O) g, �, C, C, a a N: W T Vi N, N: a 3: C -O c C N, N. o c = @ N Q a .c, O U, w0, O y, N: >. ;C N LL d c. as' — �, avi, d, m. c' as a, a v Y C N N' v v >o' .N :°, L, ; y, o .E o, a, C, �, _ E a) y' E' a) v o' L C, C: m, 3 c0 m' m' _C ar o _ a vo' m m o c, 0 c, N o 0 c w >' a) c 3' co co `� c , 0 « `O 0, E, c o v a), o, o, v m, D •a) a) =c � a E — m "E `� '2.), U 'p ll =' .�. a)' O O O N @ ,p ar O 0 7 U > > 3' O) 7 7 0 o) O a) ' u1' ca a y, V' `' m � m a), m `m E E 3 of F- H H y' y > d d p• o', a v. € cEn � c f "J o N, a), c. 7, 'O 4 4 a), a), ca 0 7 2' 2 M a) v, a) v, `O •.c O, O, L, m a) coa), a), o, D z; a, _J, D, 5', 5' 5' cn . O, O, a, a. U, ', Q; a o cnUUU o ¢, ¢, w; p', m, m, U, S', N', 2', a; p; w, cn, U, co w • N M t7 U) (O CO O) O N M U) CO N. CO O) O N M U) CO h CO m 00 E N M V U) CO h 00 O) O . . N N N N N N N N N N M C) M M M M CI) CO V) a) U N N_ ._ a) :c;;, .O-, 0 .U-, C a O c !2 U N l0 N V O co v O p co) 0) p p o o y Lao 6a r— E co " ao) E P.... 4 a) T -I N W N 67 U O cQ ik I C `p D a U) O n a o LLI' a. UU)) W < CD 0 Q u) S-. a