Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
184-089
f�U/ • P [e4oE io Regg, James B (DOA) From: Jones,Jeffery B (DOA) Zen ` -ksli Sent: Monday, March 27, 2017 4:48 PM To: Regg, James B (DOA) Cc: Quick, Michael J (DOA) Subject: FW: BPXA PBF 15-17 Deficiency Report Attachments: 15-17 DR.pdf Please see attached returned signed BPXA PBF 15-17 deficiency report Thanks, Jeff B.Jones Petroleum Inspector Alaska Oil &Gas Conservation Commission N. Slope Ofc: 907-659-2714 SCANNED JUL 1 4 21(, Mobile: 907-744-4446 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jeff B. Jones at 907-659-2714 or jeff.jones@alaska.gov. From: Riley, Mark P [mailto:RileyMP@BP.com] Sent: Monday, March 27, 2017 2:32 PM To:Jones,Jeffery B(DOA) <jeff.jones@alaska.gov> Subject: 15-17 Deficiency Report Jeff, Glaciation in W/H cellar has been thawed and control lines have been secured out of cellar. W/H door repairs had a work order for repairs and is scheduled to be addressed 4/4/17. Thanks, Mark Riley Alternate:Justice Engish FS3DS OP's Lead Office (907)-659-8341 Harmony 758-0858 Cell (907)-841-2395 1 7 • • State of Alaska Oil and Gas Conservation Commission Deficiency Report Location: N. Slope Prudhoe Bay Field well 15-17 •-v Date: 3/25/17 PTD: 1840890 �. Operator: BPXA Type Inspection: Safety Valve test ✓ Operator Rep: Mark Riley Inspector: Jeff Jones Position: Lead Operator Op. Phone: 907 841 2395 Correct by(date): 4/25/17 op.Email: rileymp@bp.com Follow Up Req'd: Yes Detailed Description of Deficiencies Date Corrected Glaciation (water flowing up the conductor pipe and freezing, causing t- -c I l,'ht s_ 3 /2.7/!7 ice buildup) is occurring in the well house cellar. The Safety Valve System bt.) c..// hydraulic control lines are encased in ice. The well house double doors 44- ov Yr°r- 'Y ' 7 are damaged and are allowing snow and ice to accumulate in the well house and limiting safe egress to equipment. Attachments: well house and cellar photos (2) Operator Rep Signatures: 9, fl44 — AOGCC Inspector *`After signing,a co'� of ' form is to left with the operator, Follow-up Instructions Return a copy of this Deficiency Report to AOGCC(Attention:Inspection Supervisor)within 7 days of receipt. Include the"Date Corrected"and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-up inspection was performed by AOGCC,include the date and name of Inspector. Extensions for corrective actions taking longer than the"correct by"date must be requested and accompanied by justification(Attention:Inspection Supervisor).Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority for follow-up action. Revised 2/2016 0i 111 O NI- Ci N N.t- WO W N z E to c 0 N y d o c t 5E; 0 0 ..coZo y (A w 07 0 V 0p R R c a .20c -, .., 9 caQ Q M rn= a) RVN ^ d ( Q _ O • 3 �Q oL y "603om br v • - c M c U __ Y (U 0) C D N N R O c O O M o O E C,) O N V N O N C co U Q N Q J m - r- t2 - - - .- ; . rr r rrr r � �� .- ;: ,- - ,- ; ,7. - ,- ‘- - - 1- '- '- ; t5 _ a OO7f77O > > V3D - 70c 7300 o 7aZ7 .7oaQ7oa0 ' ; aQa ? 7mM h N .- <O �f1 (.4N - = N n „. (NW 0) t0 N N , 9 CZ Lit ( Gam? C A G�j V J' ice• O Q? o 00 O O 0 f- D cc c C9z ZC7 . . C9Z (7ZC9U' (9z ( C9 C9U' C9 U S a O 0 0 0 0 0 O 0 O 0 O O O 0 o O 000 W Q •: J . . . . . . F J F J J J F J J J -.1.-1 >. a „0000 . 0 .000D00000 0. m O W W O O O O W O W O O O W O O 000 O LU F- ZZF- FFFzI- z - FZFF- I- I- I- (.) z rn Z O O Z Z Z Z O Z O Z Z Z O Z Z Z Z Z W o O w w O O O O w O w O O O w O O 000 0 z X J H1" 1' HHFhf' FI- PPPI— F FF-)- S 0 zZWW - = , W - WII-IIrmlr~ - - + - , 0 aa"- QaaQaQa000aaa aa < v m m5& , mmu) mFm0) 0)m � wm ? NN( T n mwwmmmmwmommmwmm mm 'O I- 0 U - U - U - UQ ..._ R w 5 >_ >_ 555 -6 ›. 5 ,. 556 ,_ 55 >_ >_ 555 -6 ›. 5 ,. 55 >_ >_ 555 -6 ›. 5 ,. 556 ,_ 58m1- 085_ P. m > mm > > > > m > m > > > m » 00 > > > ro O m mmmm m mmm mm - mmmm Z w - O w w w w - w - www - w w N -www 13 W22WWW2W2WWW2WWWMWWW ` zWm a. z o ,� _ IU .. • (0 a°iNc � M000mo°Oioa�i � u) a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m N 'o' QS � Fc4Fapc9 �?C) YaQoa2YRaY4 ►- d U ►- moUmow p- Mao - vwmm - wm a V Zoan ? mno ? D ? 5. mo > omo > mm w mmmmmmmmmmmmmmammmamm 0 N O w No m -J o co.1. W 6 d c d00 C7 ao c 7 7 0 p 3 w W Y U G. c - o 'er m W O d O> a mOJQaQ U m aUr < NNZ R 2. vj ptf to Y .� rmr- 07 � ONNONN - 01v- Ne_ aNc4 � �i3 Z Q p E Vie - ¢ R 3 0Ya $ tir = 0LL2 � •- 2 W oO0NOOO P o m o .1162 U U 0 NRaCNC) m 1 O N UOU a ` Lcmrt R E y N Q d Y (9 O Ca R N c Z Q W0 W CIS 0 H J d N p Zi �n N Q Q a 00 d rn BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 by `i ". ~' ;,.°~ , Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS 15 Dear Mr. Maunder, i$4-'~~~ ~5- -7 Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS 15 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) DS-15 rlata• n1/r15/10 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al 15-01 B 2042570 50029206960200 NA Sealed NA 15-026 2060720 50029206970200 NA Sealed NA 15-03 1820300 50029207220000 NA Sealed NA 15-04B 2071380 50029207260200 NA Sealed NA 15-05A 1950340 50029207310100 NA Sealed NA 15-O6A 1982540 50029207420100 NA 6.7 NA 40.8 11(7/2009 15-07C 2030970 50029211660300 NA 5 NA 34.0 11/10/2009 15-08C 2050050 50029211800300 NA 6.5 NA 45.9 11/28/2009 15-09A 1931380 50029212010100 NA 0.9 NA 5.1 11/11/2009 15-10A 1880850 50029205010100 NA Sealed NA 15-11 B 2041460 50029206530200 NA Sealed NA 15-12B 2060870 50029206650200 NA Sealed NA 15-13A 1991240 50029206450100 NA Sealed NA 15-14A 2042220 50029206820100 NA Sealed NA 15-15C 2081820 50029206910300 NA Sealed NA 15-16A 2011920 50029211150100 NA 0.3 NA 3.4 11/7/2009 15-17 1840890 50029211260000 NA 14.7 NA 132.6 12/4/2009 15-18A 2080830 50029222740100 NA 0.4 NA 1.7 11/11/2009 15-19A 1990990 50029218290100 NA surface NA 15-20C 2050930 50029211330300 NA 17 NA 120.7 12/2/2009 15-21A 1990290 50029205030100 NA Sealed NA 15-22 1800970 50029205090000 NA Sealed NA 15-23A 2031110 50029222250100 NA 0.7 NA 3.4 10/7/2009 15-24 1911280 50029222230000 NA 1.3 NA 10.2 10/7/2009 15-256 2080240 50029218420200 NA 0.8 NA 6.8 11/12/2009 15-26B 2041590 50029222350200 NA 0.3 NA 1.7 10/8/2009 15-27 1920060 50029222430000 NA 0.3 NA 1.7 10/8/2009 15-28A 2031240 50029222470100 NA 0.5 NA 8.5 11!9/2009 15-29B 2090380 50029222590200 NA 0.1 NA 1.7 11/10/2009 15-30A 2020890 50029222820100 NA 0.8 NA 5.1 11/11/2009 15-318 2050860 50029222850200 NA 1.2 NA 3.4 11/11/2009 15-32A 2011840 50029224620100 NA 1.5 NA 10.2 10/7/2009 15-336 2031940 50029224480200 NA 1.6 NA 10.2 11 /29/2009 15-34A 2001370 50029224740100 NA 1.4 NA 8.5 11/10/2009 15-35 1940880 50029224880000 NA 1.8 NA 15.3 11/10/2009 15-366 2060730 50029224800200 NA 1 NA 5.1 11/10/2009 15-376 2040190 50029224850200 NA 1.3 NA 10.2 11/9/2009 15-38A 2030160 50029224960100 NA Sealed NA 15-39A 2060860 50029225030100 NA 0.3 NA 1.7 11/9/2009 15-40A 1980980 50029225110100 NA 1 NA 5.1 11/9/2009 15-41B 2011460 50029224920200 NA 1.2 NA 6.8 11/9/2009 15-42B 2090730 50029226240200 NA 1.5 NA 11.9 11/11/2009 15-44 1961100 50029226830000 NA 3.5 NA 30.6 12/17/2009 15-45B 2071790 50029226710200 NA 1.7 NA 11.9 11/8/2009 15-46 2041030 50029226650000 NA 1.9 NA 17.0 11/9/2009 15-47 1951740 50029226170000 NA 1.5 NA 10.2 10/9/2009 15-488 2051660 50029226350200 NA 1.2 NA 10.2 10/8/2009 15-498 2090640 50029226510200 NA 7.3 NA 51.0 11/8/2009 A STATE OF ALASKA ~;? RECE\VED ALAYA OIL AND GAS CONSERVATION CO&ION JUN 2 1 l007 REPORT OF SUNDRY WELL OPERATIONS C mission Älaska Oil & Gas Cons. om 1. Operations Performed: o Abandon ~ Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Alter Casing ~ Pull Tubing o Perforate New Pool o Waiver o Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ~ Development o Exploratory 184-089 ~ 3. Address: o Service o Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21126-00-00 7. KB Elevation (ft): 71' I 9. Well Name and Number: PBU 15-17 ~ 8. Property Designation: 10. Field / Pool(s): ADL 028306 ' Prudhoe Bay Field / Prudhoe Bay Pool· 11. Present well condition summary Total depth: measured 1 0850 ¡ feet true vertical 8914 feet Plugs (measured) None Effective depth: measured 10830 feet Junk (measured) None true vertical 8904 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1490 470 Surface 2499' 13-3/8" 2499' 2499' 4930 2670 Intermediate 9835' 9-5/8" 9835' 8297' 6870 4760 Production Liner 1295' 7" 9539' - 10834' 8082' - 8906' 8160 7020 5CANNED JUL o 6 2007 Perforation Depth MD (ft): 10626' - 10834' Perforation Depth TVD (ft): 8799' - 8906' 4-1/2", 12.6# 13Cr / L-80 9520' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 9-5/8" x 4-1/2" Baker 'S-3' packer; 9287' 9-5/8" x 4-112" BAker 'FHL packer 9416' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut and pull tubing to 9381'. Run new Chrome tubing. 13. Reoresentative Daily Averaae Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl CasinQ Pressure Tubina Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after proposed work: ~ Daily Report of Well Operations o Exploratory ~ Development o Service 16. Well Status after proposed work: ~ Well Schematic Diagram ~Oil o Gas o WAG OGINJ OWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact Frank Roach, 564-4373 N/A Printed Name Terrie Hubble Title Technical Assistant Signature ~Ñ.P. ~ Date °12.0107 Prepared By Name/Number: Phone 564-4628 Terrie Hubble, 564-4628 Form 10-404 Revised 04/2006 "rv~"'" tH"'L JUL 0 6 Submit Original Only u ti.iLJ Ii \j A L 2007 h~1 (, Digital Wellfile . Page 1 of 1 . Well: 15-17 Well Events for SurfaceWell - 15-17 Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> FS3 -> 15 -> 15-17 Date Range: 23/Mar/2007 to 04/May/2007 Data Source(s): AWGRS Events Source Well AwGRS 15-17 AW~RS 15-17 AWGRS 15-17 AWGR5 15-17 AWGR,S 15-17 AWGRS 15-17 AWGRS 15-17 Date 05/04/2007 04/07/2007 04/04/2007 04/03/2007 04/01/2007 03/31/2007 03/23/2007 Description T/I/O= SSV/O/O. Temp= 51. Monitor (pre-RIG). Intergal flange installed on IA & OA. SET 4" FMC BPV THRU TREE PRE RIG WORK API VALVE SHOP T/I/O= 140/20/150. CIRC OUT (PRE RWO) Pump 5 bbls neat and 1068 bbls Sea Water down the TBG and take IA returns to well #16's flowline. Pump 180 bbls of heated diesel down the IA and take TBG returns to #16's flowline. U-Tube Tx IA for freeze protection. Final WHP= 0/0/0. ***WELL SHUT-IN ON ARRIVAL*** JET CUT 4 1/2"TUBING 3' BELOW BOTTOM GLM INTO 10' PUP, DEPTH 9,386' CORRELATED TO SWS SCMT LOG DATED 10-APR-06. WELL LEFT SHUT-IN. ***JOB COMPLETE*** T/I/0=20/50/50 CMIT TxIA PASSED to 3500 psi, MIT OA PASSED to 2000 psi (RWO prep) (Shut in) Pumped 23.9 bbls of diesel and 1.9 bbls of meth down IA to reach 3500 psi on tubing and IA.. T/I lost 60/60 1st 15 mins, T/I lost 30/30 2nd 15 min for a total of 90/90 psi in 30 mins. Bled TxIA. Bled back 11+ bbls of diesel MIT OA to 2000 psi. Pumped 1.8 bbls of 6* meth down OA to reach 2000 psi .OA lost 80 psi 1st 15 mins, OA lost 10 psi 2nd 15 min for a total of 90 psi in 30 mins. Bled back l+bbls of meth Final Whp's=75/75/20 ***WELL 5/1 ON ARRIVAL ***(pre rwo) DRIFTED W 3.70" CENT, S-BAILER ( S-BAILER EMPTY) SET PX PLUG BODY ( 4 - 3/16 PORTS OAL 20 " SET /2" PRONG ( 4- 3/16 PORT 1 1/2" RS, OAL 104.5" FN 1 3/8) ***WELL 5/1 ON DEPARTURE*** T/OA/IA= 0/300/0 PPPOT-T(PASS) PPPOT-IC (PASS) LDS PPPOT-T(PASS) Installed Bled tool into tubing head adapter void 50 psi present. Pressured to 5000 psi for 30 minute test 100 psi/15 minute 50 psi/30 minutes. Re installed Alemite cap .Cycled all LDS all moved free no bent or broke pins. PPPOT-IC (PASS) Installed bled tool into IC test void 0 psi present. Pressured to 3000 psi for 30 minute test 50 psi/15 minute 0 psi/30 minutes. Cycled LDS all moved free no bent or broke pins. http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx 6/19/2007 . . BP EXPLORATION Page 1 of 11 Operations Summary Report Legal Well Name: 15-17 Common Well Name: 15-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/4/2007 09:00 - 00:00 15.00 MOB N WAIT PRE Wait on snow cleanout for access to and through Drillsite 15 to the DS 15-17 well slot. 5/5/2007 00:00 - 12:00 12.00 MOB N WAIT PRE Continue to wait on location to be ready prior to mobilizing the Rig. 12:00 - 18:00 6.00 MOB P PRE Mobilize the Rig and its Components from GPB G-Pad to DS 15. 18:00 - 00:00 6.00 RIGU P PRE Arrive on DS 15. Spot the Camp, Shop and Generator. Pre-tour safety meeting with night crew. Layout Herculite. Back the Carrier over the well with the WSL and Tourpusher witnessing. The Drill Site Operator gave us his okay to back over the well without him. Spot Rig Mats under the Carrier. Back the Pipe Shed and Pits Modules and spot adjacent to the Carrier. RU Handy Berm. Raise and scope Derrick. 5/6/2007 00:00 - 02:00 2.00 RIGU P PRE Continue RU on well slot 15-17. Veco Well Support arrives and RU 500 bbls Tiger Tank with associated hardline. 02:00 - 03:00 1.00 RIGU P PRE Begin hooking up lines to the Tree. The Rig was accepted at 02:00 hrs on 5/6/2007. Begin RU to the Tree. 03:00 - 04:30 1.50 WHSUR P DECOMP PU Lubricator and MU to the Tree. Pull the BPV with the Well Support Techs. The Tubing is on a vac. The IA is on a vac. LD Lubricator. 04:30 - 12:30 8.00 KILL P DECOMP Continue RU to the Tree for the well circulation. Hook up the Choke and Kill Lines. NU Double 3-1/8" Valves on the Annulus. Test lines and find leak at one of the Micro-Motion meter connections. Resume testing lines and find leaks in the Mud Manifold and in the Stand Pipe. Use heater to thaw out valve leading to flowline tied into Blowdown Tank. 12:30 - 15:30 3.00 KILL P DECOMP Circulate in 667-Bbls of 110-120 F seawater to displace diesel freeze protect fluid. Start with 2-1/2-BPM at 10-psi, ramp up to 4-BPM at 150-psi. 100-Bbls circ'd: TP 300-psi, CP 50-psi. 200-Bbls: TP 225-psi, CP 60. 400-Bbls: TP 235-psi, CP 60-psi. 600-Bbls: TP 295-psi, CP 50-psi. 650-Bbls: TP 320-psi, CP 60-psi. Returns were clear at 667-Bbls. Recovered 615-Bbls. 15:30 - 16:30 1.00 KILL P DECOMP R/U to pressure test PXX plug set in the X-nipple at 9420'. PT to 1000-psi for 10-minutes. Solid test. 16:30 - 18:00 1.50 KILL P DECOMP Blow down lines, Choke Line and hard line out to the Tiger Tank. RD lines off of Tree and clean up the Cellar. 18:00 - 20:00 2.00 WHSUR P DECOMP Set BPV with FMC rep. RU to test from below. Found a leak in the Kill Line. Attempt to tighten and still leaking. RU to test down the IA with our Test Pump. 20:00 - 21 :30 1.50 WHSUR P DECOMP Test the BPV from below to 1,000 psi for 10 mins, charted - OK. Bleed down test pressure. RD Test Equipment. 21 :30 - 23:00 1.50 WHSUR P DECOMP ND Tree and Adapter Flange. Inspect Hanger threads with FMC rep - OK. The top Hanger threads are 5 3/4" LH Acme. Install Blanking Plug on the BPV with FMC rep. It took 10 turns to make up. 23:00 - 00:00 1.00 BOPSUF P DECOMP NU 13 5/8" BOPE. 5/7/2007 00:00 - 05:00 5.00 BOPSUF P DECOMP Continue NU BOPE. Change out Single Gate and install Spacer Spool. 05:00 - 06:30 1.50 BOPSUF P DECOMP RU Test Equipment and function test BOPE. 06:30 - 11 :00 4.50 BOPSUF P DECOMP Test BOPE 250-psi, low; 3500-psi, high. All test good. AOGCC witness waived by Bob Noble. 11 :00 - 14:00 3.00 PULL P DECOMP Bleed lines to SSSV and to Chemical Injection mandrels. The Chemical Injection lines are bleeding the lighter fluid out slowly Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 2 of 11 Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/7/2007 11 :00 - 14:00 3.00 PULL P DECOMP into 5-gallon buckets. The FMC tech is wearing goggles, face Shield and rubber gloves, and the fluid appears to be diesel and crude oil. Took 1-hour to safely bleed the Chemical Injection lines of diesel and crude oil. 14:00 - 16:30 2.50 PULL P DECOMP P/U dry rod and pull the FMC Blanking Plug. P/U 7" Lubricator Extension borrowed from 4ES, RIH and pull the FMC BPV. DSM's lubricator would not reverse out the polished rod, but engaged the BPV and released the button. Well on slight vacuum induced by wellbore cooling. Pull off lubricator and BPV came with the polished rod. RID Lubricator and extension. The internal piston of the lubricator had unscrewed from the polished rod, which is why the polished rod would only downstroke, regardless the position of the handle on the 4-way valve of the lubricator. 16:30 - 18:00 1.50 PULL P DECOMP P/U 4-1/2" Bowen Itco Spear with 2-3/8" Bullnose and 3-5/8" packoff and M/U to one joint of 3-1/2" IF Drillpipe. RIH and engage in 4-1/2" tubing below Hanger, unseat and pull hanger to Rig Floor with 125K-lbs. The encapsulation surrounding the Control and Chemical Injection Lines appeared to be in very good shape immediately below the Hanger. 18:00 - 18:30 0.50 PULL DECOMP Break out and lay down Itco Spear with Baker rep. Break out and lay down Hanger with FMC rep. 18:30 - 20:30 2.00 PULL P DECOMP R/U Schlumberger Spooler for the Control and Chemical Injection lines. 20:30 - 23:00 2.50 PULL P DECOMP POOH with existing 4 1/2" BTC Tubing laying down in the Pipe Shed 1 x 1 while spooling the Control Line and Chemical Injection Lines onto the Schlumberger Spooler. Maintaining constant hole fill with the Charge Pump. Stop with 14 Joints of Tubing out of the well to swap out Spooling Units. Cut the Chemical Injection and Control Lines and plug off for transportation to Schlumberger shop. We are getting back corrosion inhibitor out of one of the Chemical Injection lines. 23:00 - 00:00 1.00 PULL N WAIT DECOMP Call the Wells Group and discuss purging of Chemical Injection Lines. This was done in 1997 and one of the two lines was not successfully purged due to it being plugged off downhole. Discuss plan forward with Anchorage Engineering. 5/8/2007 00:00 - 01 :00 1.00 PULL N WAIT DECOMP Continue to discuss plan forward with Anchorage Engineering and Wells Manager. Plan forward is to mitigate the relief and disposal of the corrosion inhibitor on surface with the proper PPE and spill prevention measures. GPB Environmental Department was alerted of our plan forward. 01 :00 - 01 :30 0.50 PULL P DECOMP PJSM with WSL, Tourpusher, Nabors Crew and Schlumberger personnel to discuss plan forward. The MSDS for corrosion inhibitor was reviewed as well as PPE Requirements, first aid response and hazards associated with cutting the lines. 01 :30 - 04:00 2.50 PULL P DECOMP POOH with existing 4 1/2" BTC Tubing spooling up the Control and Chemical Injection Lines into the Spooling Unit. Maintaining constant hole fill with the Charge Pump. Stop with 28 Joints of Tubing out of the well to swap out Spooling Units. Cut the Chemical Injection and Control Lines and plug off for transportation to Schlumberger shop. 04:00 - 07:00 3.00 PULL P DECOMP Continue POOH with 4 1/2" Tubing utilizing the Schlumberger Spooling Unit for the Control and Chemical Injection Lines. Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 3 of 11. Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 15-17 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/8/2007 04:00 - 07:00 3.00 PULL P DECOMP Stop with 46 Joints of Tubing out of the well to swap out Spooling Units. Cut the Lines and plug off with Swagelok fittings. Wait on first Spool to return from Schlumberger Shop. c 07:00 - 08:30 1.50 PULL P DECOMP Resume POOH, LID single joints and coiling the controline and cehical injection umbilicals on Schlumberger spooler. Stop and change out spoolers twice. The SSSV was laid down at 0800-hrs. Pipe Skate flipper electrical controls failed at 0830-hours. 08:30 - 15:00 6.50 PULL N RREP DECOMP Call Nabors Oilfield Camp (NOC) for mechanic and electrician to come to location to repair Pipe Skate electrical system. Fixed flippers, but electrical failure cascaded. 15:00 - 17:00 2.00 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. Filled 4th spool at 1600-hours with 62-joints of 4-1/2 tubing laid down. Move full spooler down the Beaver Slide and out the Pipe Shed; bring empty Spooler to the Rig Floor. 17:00 - 20:45 3.75 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. Filled 5th spool at 1900-hours with 85-joints of 4-1/2 tubing laid down. Move full spooler down the Beaver Slide and out the Pipe Shed; bring empty Spooler to the Rig Floor. 20:45 - 23:00 2.25 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. Filled 6th spool at 2200-hours with 105-joints of 4-1/2 tubing laid down. Move full spooler down the Beaver Slide and out the Pipe Shed; bring empty Spooler to the Rig Floor. 23:00 - 00:00 1.00 PULL P DECOMP Resume POOH. 5/9/2007 00:00 - 02:00 2.00 PULL P DECOMP Filled 7th spool at 0115-hours with 127 -joints of 4-1/2 tubing laid down. Move full spooler down the Beaver Slide and out the Pipe Shed; bring empty Spooler to the Rig Floor. NOTE: Sheathing around injection lines is in poor condition. High likelihood of large chunks of sheathing lost downhole. 02:00 - 05:00 3.00 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. Filled 8th spool at 0345-hours with 157-joints of 4-1/2 tubing laid down. Move full spooler down the Beaver Slide and out the Pipe Shed; bring empty Spooler to the Rig Floor. NOTE: Nearly all of the sheathing has come off the injection lines. 05:00 - 08:30 3.50 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. Filled 9th spool at 0500-hours with 188-joints of 4-1/2 tubing laid down. Changeout spoolers. NOTE: All of the encapsulation has come off the injection lines. 08:30 - 12:30 4.00 PULL P DECOMP Resume POOH, LID tubing through Pipe Shed and spooling chemical injection umbilical. All of the encapsulation came off the injection lines. Lost -173' of the reinforcement cable. Brought top GLM to Rig Floor at 1130-hrs. Brought bottom GLM to Rig Floor with a 2.92' cutoff on the bottom. Recovered all 232 full joints. 232 of 234 clamps that were recorded on the initial completion running summary, but there were none found to be missing from the string. 22-SS Bands were recovered versus 14 noted in the initial running summary. 12:30 - 14:00 1.50 PULL P DECOMP R/D Schlumberger, Clear and Clean Rig Floor. 14:00 - 15:00 1.00 PULL P DECOMP P/U Wear Ring And Running Tool, M/U to Landing Joint, RIH Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 4 of 11 Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/912007 14:00 - 15:00 1.00 PULL P DECOMP and set Wear Ring. LID Landing Joint. 15:00 - 17:00 2.00 CLEAN P DECOMP M/U BHA #1: RCJB, Washover extensions, Boot Baskets, Jars, and 6-Drill Collars. Total Length of BHA #1= 228.85'. 17:00 - 18:00 1.00 CLEAN P DECOMP R/U Drill Pipe Spinners and Floor to Pick Up 3-1/2" Drill Pipe from Pipe Shed. 18:00 - 19:00 1.00 CLEAN P DECOMP Service Rig and Equipment. 19:00 - 00:00 5.00 CLEAN P DECOMP RIH with RCJB on 3-1/2" IF, 13.3 ppf Drill Pipe picked up from Pipe Shed to 4721' with 145 Joints. Average Running Speed- 30 Joints per Hour. 5/10/2007 00:00 - 00:30 0.50 CLEAN P DECOMP Continue RIH with RCJB on 3-1/2" IF, 13.3 ppf Drill Pipe picked up from Pipe Shed from 4721' to 5185'. Picked up a total of 160 Joints. 00:30 - 04:00 3.50 CLEAN P DECOMP Change out Jerk Lines from 5/8" to 3/4" to Torque up Kelly. P/U Kelly and Kelly Bushings. M/U Kelly and stand back in Kelly Shuck. 04:00 - 09:00 5.00 CLEAN P DECOMP Continue RIH with RCJB on 3-1/2" IF", 13.5 ppf Drill Pipe picked up from Pipe Shed from 4721' to 7561'. Pick up 3-1/2" IF, 15.5 ppf Drill Pipe and continue RIH to 9360'. Picked up a total of 294 Joints. 09:00 - 15:30 6.50 CLEAN P DECOMP RIH and tag @ 9360' MD. P/U = 140k-lbs. S/O = 110k-lbs. Circulate @ 3.5 BPM and 650 psi. P/U 10' and RBIH to 9362' MD and sit down 10k-lbs. P/U 10' and RBIH to 9364' MD and sit down 8k-lbs. P/U 10' and RBIH to 9367' MD and sit down 10k-lbs. P/U joint # 295. Pump 25 Bbl Flo-Vis L Sweep down DP. RIH to 9370' MD and sit down 10k-lbs. circulate 645 Bbls surface to surface at 4 BPM and 1000 psi. Nothing seen across the Shaker as sweep returned. 15:30 - 21 :30 6.00 CLEAN P DECOMP POH wI BHA #1 while SIB 3-1/2" DP. 21 :30 - 22:30 1.00 CLEAN P DECOMP At 95 Stands Out of the Hole, Drill Pipe started pulling wet. Unsuccessfully attempt to break circulation. Bleed off pressure. Make three more attempts to break circulation. R/U to POOH wet. 22:30 - 00:00 1.50 CLEAN P DECOMP Continue POOH wI BHA #1 wet while SIB 3-1/2" DP. 5/11/2007 00:00 - 03:00 3.00 CLEAN P DECOMP Continue POOH wI BHA #1 wet while SIB 3-1/2" DP. 03:00 - 06:00 3.00 CLEAN P DECOMP PJSM. POOH wI RCJB BHA. Stand back 2 Stands 4-3/4" Drill Collars. Lay down 2 Joints of Drill Collars that were packed off with Scale. Break out RCJB and Washover Extensions. Washover Extentions full of Ground up Rubber. Recovered 20 Gallons of Rubber in RCJB. Clean out packed off Drill Collars. Cleaned out Boot Baskets. Recovered 2 Gallons of Rubber and Scale in Boot Baskets. 06:00 - 07:30 1.50 CLEAN P DECOMP M/U BHA #2: RCJB, Washover extensions, Boot Baskets, Jars, and 6-Drill Collars. Total Length of BHA #2= 228.85'. 07:30 - 15:30 8.00 CLEAN P DECOMP RIH wI BHA #2 wI 3-1/2" DP stands from the Derrick. 25 stds in @ 0845. 50 stds in @ 0945. 75 stds in @ 1045-hrs. 90 stds in @ 1145-hrs. 112 stds @ 1300-hrs. 125 stds @ 1445-hrs. 15:30 - 22:00 6.50 CLEAN P DECOMP RIH and tag @ 9370' MD. P/U Kelly and Establish Parameters of P/U= 132k-lbs. S/O= 11 Ok-Ibs. Rotating Wt= 120k-lbs. Circulate @ 3.6 BPM and 570 psi. Pump 25 Bbl Flo Vis L Sweep, then 50 Bbls of seawater followed with another 25 Bbl Flo Vis L Sweep. Free Torque= 6000 ft-Ibs. RBIH to 9370' MD while rotating at 26 RPM and work down to 9371' MD with 6500 ft-Ibs Torque with 10k Ibs WOB. Continue circulating Sweep to Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 5 of 11 Operations Summary Report Legal Well Name: 15-17 Common Well Name: 15-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/11/2007 15:30 - 22:00 6.50 CLEAN P DECOMP surface (total volume of 645 Bbls). Torque increased to 8000 ft-Ibs. Stop Rotation and Picked up to 20k Ibs overpull. SIO to neutral wt, rotate @ 17-26 RPM with 6000 to 8500 ft-Ibs Torque. Work BHA several time before pulling free. BHA pulled free at 15k Ibs overpull. Final depth worked with RCJB= 9371'. 22:00 - 00:00 2.00 CLEAN P DECOMP Continue circulating High Vis Sweeps out of Hole at 3.6 BPM with 900 psi. 5/12/2007 00:00 - 00:30 0.50 CLEAN P DECOMP Continue circulating High Vis Sweeps out of Hole at 3.6 BPM with 900 psi. Sweep brought an increase of fine Rubber Cuttings to Surface. 00:30 - 01 :30 1.00 CLEAN P DECOMP BIO Kelly and stand back in Kelly Shuck. Monitor Well. Well slightly out of balance. Build and pump Dry Job Slug. Monitor Well, No Flow. 01 :30 - 08:00 6.50 CLEAN P DECOMP POOH wI 2nd RCJB run standing back 3-1/2" Drill Pipe in Derrick. Pulled 25 Stands @ 02:27 hrs, 50 Stands @ 03:30 hrs, 75 Stands @ 04:23 hrs, 08:00 - 09:30 1.50 CLEAN P DECOMP SIB Drill Collars in Derrick. Break and LID BHA. Inspect Boot Baskets and Junk Basket. Boot Baskets contain 2 gallons of finely ground up rubber. Junk Basket is empty and has one of the interior teeth missing. 09:30 - 12:30 3.00 CLEAN P DECOMP Confer with town. Decision made to run 12' spear in order to retrieve the reinforcement cable. LID Wash over extensions and M/U BHA #3: Spear, Ported Sub, Jars, 6-Drill Collars. Total Length of BHA #3- 219.69' 12:30 - 15:30 3.00 CLEAN P DECOMP Cut and Slip Drill Line. 15:30 - 21 :00 5.50 CLEAN P DECOMP RIH wI BHA #3 on 3-1/2" DP from the Derrick to 9361'. 80 stds in 1800-hrs, 100 stds @ 19:00-hrs, 125 stds @ 20:00,145 stds @ 20:50-hrs. 21 :00 - 22:00 1.00 CLEAN P DECOMP P/U Kelly and Establish Parameters: P/U= 128k-lbs. S/O= 110k-lbs. Rotate at 10 RPM with 4000 ft-Ibs Free Torque. RIH and tag Fish at 9375' MD. Work Rope Spear to 9380' MD without rotation. Set down 5000 Ibs on fish. POOH to 9365' without engaging Fish. RBIH to 9380'. Rotate on fish at 10 RPM. Torque inrcreased from 4k to 6k. POOH to 9370' with 22k Ibs overpull. Actuate Jars, lost 10k Ibs overpull. Increased overpull to 30k Ibs where fish pulled free. RBIH to 9380' with out rotation. Set 5000 Ibs on Fish at 9380'. POOH to 9370' with 10k overpull before pulling free. 22:00 - 22:30 0.50 CLEAN P DECOMP Break and stand back Kelly. Monitor well for flow. R/U to POOH. 22:30 - 00:00 1.50 CLEAN P DECOMP POOH wI BHA #3 (Rope Spear) standing back 3-1/2" Drill Pipe in Derrick to 7460'. Pulled 5 stds @ 23:00-hrs, 25 stds @ 23:54-hrs. 5/13/2007 00:00 - 04:30 4.50 CLEAN P DECOMP POOH wI BHA #3 (Rope Spear) standing back 3-1/2" Drill Pipe in Derrick from 7460'. Pulled 50 stds @ 01 :OO-hrs, 75 Stands @ 01:55-hrs, 100 Stands @ 02:43-hrs, 125 stds @ 03:55-hrs, 145 stds @ 04:25-hrs. 04:30 - 06:00 1.50 CLEAN P DECOMP POOH wI BHA #3. Stand back 3 Stands of Drill Collars in Derrick. Recover 36' of Reinforcement Cable. 06:00 - 07:00 1.00 CLEAN P DECOMP M/U Rope Spear BHA wI 6-Drill Collars. 07:00 - 12:30 5.50 CLEAN P DECOMP RIH wI BHA #4: Crank Shaft Rope Spear on 3-1/2" DP from the Derrick. 10 stds in @ 0740-hrs. 20 in @ 0800. 85 in @ Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 6 of 11 Operations Summary Report Legal Well Name: 15-17 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/13/2007 07:00 - 12:30 5.50 CLEAN P DECOMP 1000-hrs. 120 in @ 1100. 12:30 - 13:30 1.00 CLEAN P DECOMP RIH and Tag @ 9876' MD. M/U Kelly. POH to 9365' MD and establish parameters. P/U 130k-lbs. SIO 11 Ok-Ibs. Free spinning torque = 4k ft-Ibs @ 10 RPM. RIH to 9380' and sit down 5k - Ibs. POH to 9363' MD. Experienced 3k -Ib overpull. Repeat 3 times. RIH to 9380' MD and tag, P/U 3' and rotate at 10 RPM with 4k ft-Ibs of torque. POH to 9369' MD and rotate with 4k ft-Ibs. of torque at 10 RPM. RIH while rotating down to 9380' MD and tag. POH to 9372' MD and rotate with 4k ft-Ibs of torque at 10 RPM, POH to 9865' MD and rotate with 4k ft-Ibs of torque at 10 RPM. POH wI BHA #4. Not seeing any overpull. 13:30 - 20:30 7.00 CLEAN P DECOMP Break and shuck Kelly. POH wI BHA #4 while SIB DP and collars. 20:30 - 22:00 1.50 CLEAN P DECOMP POOH with BHA #4 (Rope Spear Assembly). Stand back 3 Stands of 4-3/4" Drill Collars in Derrick. No Recovery with Spear. LID Spear Assembly. 22:00 - 22:30 0.50 CLEAN P DECOMP Clear and Clean Rig Floor. 22:30 - 23:00 0.50 CLEAN P DECOMP Gather up and R/U Floor to P/U Dress-Off Milling Assembly. 23:00 - 00:00 1.00 CLEAN P DECOMP P/U and RIH with Dress-Off Milling Assembly (BHA #5) consisting of: 4-1/2" Dress-Off Shoe, Washpipe Extension wI 7" x 3-7/8" Dress-Off Mill Inside, Triple Connection Top Sub, Double Pin Sub, (2) 7" Boot Baskets, (1) 9-5/8" Scraper, Bit Sub, Bumper Sub, Jars, Pump Out Sub, and (3) Stands 4-3/4" Drill Collars from Derrick. 5/14/2007 00:00 - 00:30 0.50 CLEAN P DECOMP Continue P/U and RIH with Dress-Off Milling Assembly (BHA #5) consisting of: 4-1/2" Dress-Off Shoe, Washpipe Extension wI 7" x 3-7/8" Dress-Off Mill Inside, Triple Connection Top Sub, Double Pin Sub, (2) 7" Boot Baskets, (1) 9-5/8" Scraper, Bit Sub, Bumper Sub, Jars, Pump Out Sub, and (3) Stands 4-3/4" Drill Collars from Derrick. 00:30 - 07:45 7.25 CLEAN P DECOMP RIH with Dress-Off Milling Assembly on 3-1/2" Drill Pipe from Derrick. Ran 50 stds @ 03:41-hrs, 95 stds @ 05:14-hrs. 125 stds @ 0700. 07:45 - 11 :00 3.25 CLEAN P DECOMP RIH to 9370' and tag. Kelly up. PU = 127k Ibs. SO = 105k Ibs. RIH and tag @ 9370' MD. POH to 9350' MD. Rotate at 50 RPM and 4500 ft-Ibs of torque. Circulate at 3 BPM and 370 psi. RIH to 9379' MD and experience minimal torque (5250 ft-Ibs) at 9376' MD. Continue RIH after torque decreases. Sit down at 9379.5' MD. RIH from 9379.5 to 9380.5 with 5k-lbs. WOB and 6250 ft-Ibs. of torque at 50 RPM. Evidence from weight indicator that we are drilling off. POH to 9375' MD. 11 :00 - 11 :30 0.50 CLEAN P DECOMP Circulate 25 Bbl high vis sweep at 3 BPM and 370 psi. Circulate 110 Bbls of seawater at 3 BPM and 360 psi. 11 :30 - 13:00 1.50 CLEAN P DECOMP Reverse Circulate 220 bbls while taking returns across the Shaker. 1-cup of fine metal shavings seen across the Shaker along with a half cup of rubber cuttings when sweep reached the surface. 13:00 - 13:30 0.50 CLEAN P DECOMP PIT PXX plug to 1000 psi for 5 minutes by pumping down DP with Bag closed. Good test. 13:30 - 15:00 1.50 CLEAN P DECOMP Break and shuck Kelly. POH and SIB 5-stands and one joint of DP. 15:00 - 17:00 2.00 DHB P DECOMP PUMU RTTS and Storm Valve. RIH and set at 35' MD. PIT to 3500 psi for 10 minutes and chart. POH and LID single joint of Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 7 of 11 Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 1 5-17 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/14/2007 15:00 - 17:00 2.00 DHB P DECOMP DP. 17:00 - 21 :30 4.50 WHSUR P DECOMP Drain Stack. Pull wear ring. MU and RIH wI Packoff pulling tool. BOLDS. Pull Packoff. Break with 10k Overpull and LID Packoff. MU and RIH with new Packoff and set. RILDS. Wellhead contained a 13-3/8" Mandral HGR installed in CSG Head which allowed the Packoff to be tested to 5000 psi for 15 Minutes as per FMC Technician. Test Witnessed by BPX WSL. 21 :30 - 22:00 0.50 WHSUR P DECOMP RIU Floor and Equipment to test BOPE 22:00 - 00:00 2.00 WHSUR P DECOMP Test BOPE to 250 psi Low Pressure and 3500 psi High Pressure. Each Test was held for 5 Minutes. AOGCC witness of Test was waived by John Crisp. Test was witnessed by the Nabors Toolpusher and BPX WSL. Test #1- Choke Valves No.1, 2, 3, HCR Kill, and Blind Rams Test #2- Choke Valves No.4, 5, 6, and Manual Kill Test #3- Choke Valves No.7, 8, and 9 Test #4- Choke Valves No.1 0, and 11 Test #5- Choke Valves No. 12, and 13 Test #6- HCR Choke Test #7- Pipe Rams with 4-1/2" Test Joint and Dart Valve 5/15/2007 00:00 - 02:30 2.50 WHSUR P DECOMP Test BOPE to 250 psi Low Pressure and 3500 psi High Pressure. Each Test was held for 5 Minutes. AOGCC witness of Test was waived by John Crisp. Test was witnessed by the Nabors Toolpusher and BPX WSL. Test #8- Annular Preventer with 4-1/2" Test Joint, Manual Choke, and TIW Valve Test #9- Outside Test Valve Test #10- Inside Test Valve Accumulater Test- 3000 psi Starting Pressure, 1650 psi after Actuation. First 200 psi recovery in 22 Seconds. Full Pressure in 2 Minutes and 23 Seconds. 4 Nitrogen Bottles at 1875 psi. 02:30 - 04:30 2.00 WHSUR P DECOMP Performed Draw Works Inspection. Tighten Break Pads Bolts, adjust Draw Works Rollers, and service Draw Works. 04:30 - 05:30 1.00 WHSUR P DECOMP P/U HES Storm PKR Running Tool. RIH and engage Storm PKR. POOH and LID Storm PKR and Running Tool. 05:30 - 14:45 9.25 CLEAN P DECOMP POOH with Tubing Dress-Off Milling Assembly standing back 3-1/2" Drill Pipe in Derrick. 50 stds OOH at 0830-hrs. Begin pulling wet at 90 stands OOH. Drop Ball and Rod. Pressure up to 900 psi, see shear, pressure at 120 psi. Continue circulating, pressure comes up to 2500 psi. Likely plugged off with scale. Bleed off and pressure up to 2500 psi in atttempt to clear. Cannot clear. Continue to POH wI 3-1/2" DP while SIB and pulling wet. 14:45-17:15 2.50 CLEAN P DECOMP SIB 3-stands of Drill Collars and LID BHA. Shoe shows small amount of wear on the inside of the dress off shoe. There are no indications on the Inside Mill that it milled on the stub. Consult with town. It is thought that the bottom dress off shoe was - l' over the stub. Decide to RBIH, without the Scraper, and mill an additional 4' in order to get to 9384.5' MD. 2 Gallons of Rubber Cuttings recovered from Boot Baskets. 17:15 - 19:30 2.25 CLEAN P DECOMP LID Scraper and M/U Dress-Off Mill Assembly: Dress off shoe, Inside Mill, 2-Boot Baskets, Jars, Pump Out Sub, and 3 Stand of Drill Collars from Derrick. Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 8 of 11 Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/15/2007 19:30 - 00:00 4.50 CLEAN P DECOMP RIH with Dress-Off Milling Assembly (BHA #6) on 3-1/2" Drill Pipe from Derrick. Ran 25 stds @ 20:30 hrs, 50 stds @ 21 :23 hrs, 75 stds @ 22:41 hrs, 100 stds @ 23:38 hrs. 5/16/2007 00:00 - 01 :45 1.75 CLEAN P DECOMP Continue RIH with Dress-Off Milling Assembly (BHA #6) on 3-1/2" Drill Pipe from Derrick. Ran 125 stds @ 01 :00 hrs, 145 stds @ 01 :35 hrs. 01:45-02:15 0.50 CLEAN P DECOMP RIU Floor and pick up Kelly. 02:15 - 03:30 1.25 CLEAN P DECOMP Establish Milling Parameters: Up Wt- 130k Ibs, Down Wt- 11 Ok Ibs, Rotating Wt- 120k Ibs at 44 RPM with 5500 ft-Ibs Free Torque, Pump Rate- 3.6 BPM with 540 psi. RIH and tag TBG Stub at 9380.5'. On Bottom Torque increased to 6000 to 6500 ft-Ibs with 2-4k Ibs WOB to 9383.5'. Noticeable increase in Torque to 7000 to 8000 ft-Ibs at 9383.5' to 9384.5' with 2k Ibs WOB with a slight increase in Pump Pressure from 540 to 580 psi. 03:30 - 06:00 2.50 CLEAN P DECOMP Pumped High Vis Sweep down Drill Pipe until the Sweep was on Backside. RIU and Reverse Circulate the Sweep out of the hole. Sweep brought back a large increase of fine Metal Cuttings and large and fine Rubber Cuttings. 06:00 - 08:00 2.00 CLEAN P DECOMP Pump 2nd High Vis sweep down DP, then reverse to surface. Small amount of cuttings and rubber in returns, then cleaned up quickly. Reverse circulate double DP volume. POOH, hanging up @ 9355' - 9375' in various locations, pulling 15K over. Circulate @ 4 BPM, 430 psi, and rotate and work pipe. 2000 ft-Ibs torque at different times. Work pipe until able to move freely. RBIH tag @ 9384'. 08:00 - 15:00 7.00 CLEAN P DECOMP Break out and blow down Kellly. Stand back in shuck. POOH standing back DP in Derrick. Stand back DC's 15:00 - 16:30 1.50 CLEAN P DECOMP Inspect mill shoe on BHA, shows wear indicating swallowing and milling over tubing stub. Inspect internal polish mill. Slight damage to guide buttons @ mill face. Small groove tracks on mill face. Recover metal shavings from DP stub. Empty boot baskets recovering metal shavings, rubber, goo, and scale - 2 gals. Lay down polish mill assembly. 16:30 - 20:00 3.50 CLEAN P DECOMP PUMU BHA #7 consisting of shear pin guide wI Unique Machine overshot, RCJB, boot baskets, bumper sub, oil jars, and DC's. 20:00 - 00:00 4.00 CLEAN P DECOMP RIH with 3-5/8" RCJB Assembly on 3-1/2" Drill Pipe from Derrrick. Ran 25 stds @ 20:48 hrs, 50 stds @ 22:00 hrs, 75 stds @ 22:46 hrs, 100 stds @ 23:46 hrs. 5/17/2007 00:00 - 02:00 2.00 CLEAN P DECOMP Continue RIH with 3-5/8" RCJB Assembly on 3-1/2" Drill Pipe from Derrrick. RIH with 125 stds @ 00:48 hrs, 145 stds @ 01:35 hrs. RIH wI 146 stands and (1) 7' 3-1/2" Pup Joint to 9370'. 02:00 - 03:00 1.00 CLEAN P DECOMP Pick up Kelly and Establish Parameters: Up Wt- 135k Ibs, Down Wt- 108k Ibs, Rotating Wt- 125k Ibs with 4500 ft-Ibs Free Torque, Pump Rate- 3.6 BPM with 550 psi. Continue RIH. Tag Top ofTubing Stub at 9380.5'. Overshot Shear Pins sheared on the way in the hole. Stacked just enough weight on top of Tubing Stub to rotated 3 turns where RCJB slipped into Tubing Stub. Continue washing in hole. Tagged fill at 9397'. Washed to 9399'. Made several attempts to wash further with 5-8k Ibs WOB with no success. Pump Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 9 of 11 Operations Summary Report Legal Well Name: 15-1 7 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/17/2007 02:00 - 03:00 1.00 CLEAN P DECOMP back to back High Viscosity Sweeps. 03:00 - 08:00 5.00 CLEAN P DECOMP Circulate Sweep out of the Hole at 3.6 BPM with 550 psi (645 bbls). First Sweep brought back a noticable increase of Fine to Medium size Rubber to Surface. Second Sweep brought back a slight increase of Fine Rubber to Surface. Returns cleaned up right after High Vis Sweep. 08:00 - 13:30 5.50 CLEAN P DECOMP Stand back and blow down Kelly. POOH with RCJB BHA. 13:30 - 15:00 1.50 CLEAN P DECOMP Stand back DC's, break out RCJB. Packed off completely with fine sand. 15:00 - 16:30 1.50 CLEAN P DECOMP PUMU GS spear on 2 7/8" PAC DP with shear pin guide overshot and 8.25" Unique Machine overshot on 5 3/4" wash pipe., 2 ea 7" boot baskets, Bowen 4 3/4" bumper sub and jars. MU on 4 3/4" DC's. 16:30 - 22:00 5.50 CLEAN P DECOMP RIH wI GS BHA on 3 1/2" DP from Derrick. Ran 25 stds @ 17:15 hrs, 50 stds @ 17:50 hrs, 22:00 - 22:30 0.50 CLEAN P DECOMP P/U Kelly. R/U to Pump Safe Surf 0 Sweep and Displace. 22:30 - 00:00 1.50 CLEAN P DECOMP Pick up 10' Pup. Establish Fishing Parameters: Up Weight- 130k Ibs, Down Weight- 115k Ibs. Tag top ofTubing Stub at 9380.5'. POOH to 9375'. Finish cleaning Pits, Mix 30 bbl Safe Surf 0 Sweep. Line up and Prep Vac Trucks to off load new Seawater and take returns from Tiger Tank. PJSM with Rig Crew and Support. 5/18/2007 00:00 - 03:30 3.50 CLEAN P DECOMP Pump 30 bbl Safe Surf 0 Sweep followed by 681 bbls of new Seawater to displace old dirty Seawater. 03:30 - 06:30 3.00 CLEAN P DECOMP Fishing Parameters established at 130k Ibs Up Weight, 115k Ibs Down Weight. Engage deployment sleeve and pull KB PKR wI tailpipe and PXX plug wI 25K over pull. Well go on vaccum. Attempt to fill hole with charge pump. Pump 50 Bbls wI not returns. POH above tubing stub, break out and stand back Kelly. Attempt to fill hole wI SW. Pumped 89 bbls to catch Fluid. 06:30 - 17:45 11.25 PULL P DECOMP Pumping across the top wI losses @ 1.5 BPM I 90 Bls-Hr as POOH laying down 3 1/2" DP. Losses decreased to -65 Bbls/hr (-1 BPM). 17:45 - 21 :30 3.75 PULL P DECOMP PJSM. POOH with GS Spear BHA. Stand back 3 stands of 4-3/4" Drill Collars. LID Bumper Sub, Jars, XIO Subs, and 2 Joints of 2-7/8" Drill Pipe. Recover and LID GS Spear Assembly, Baker Deployment Sleeve, Baker KB PKR, PXX Plug, and Assembly (full recovery). POOH and LID Wash pipe Extentions and Unique Overshot Guide Shoe. 21 :30 - 23:00 1.50 PULL P DECOMP Clear and Clean Rig Floor. Prep to RIH with Drill Collars and Break Kelly. 23:00 - 23:30 0.50 PULL P DECOMP RIH with 3 Stands of 4-3/4" Drill Collars and 1 Stand of 3-1/2" Drill Pipe. 23:30 - 00:00 0.50 PULL P DECOMP PJSM, Pick up Kelly 5/19/2007 00:00 - 01 :00 1.00 PULL P DECOMP Make Service Breaks on Kelly. Set back Kelly in Kelly Shuck. 01 :00 - 02:00 1.00 PULL P DECOMP POOH and LID 2 Joints of 3-1/2" Drill Pipe and 6 Joints of 4-3/4" Drill Collars. 02:00 - 04:00 2.00 PULL P DECOMP Pick up and break down Kelly. LID Kelly, Kelly Swivel, and Kelly Bushings. 04:00 - 04:30 0.50 PULL P DECOMP Pick up Running Tool and Pull Wear Ring. 04:30 - 08:00 3.50 RUNCm p RUNCMP RIU Stabbing Board in Derrick. Load 4-1/2" TBG in Pipe Shed. 08:00 - 10:00 2.00 RUNCm p RUNCMP RU floor wI doubles stack hydraulic tongs, compensator, Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 10 of 11 Operations Summary Report Legal Well Name: 1 5-1 7 Common Well Name: 1 5-17 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS3S Rig Number: Date From - To Hours Task Code NPT Phase Description ofOperatìons 5/19/2007 08:00 - 10:00 2.00 RUNCO p RUNCMP elevators, single jt elevators etc. and prep for running new completion. PJSM reviewing proper procedures and hazards associated with running the completion. 10:00 - 00:00 14.00 RUNCO P RUNCMP RIH w/4 1/2" completion string. Baker-Iok all joints below Baker 41/2" x 95/8" S-3 packer. Run 4 1/2",12.6 #,13 CR. Vam Top tubing. MU to 4444 ft-Ib with weight compensation and torque-turn services. Keeping hole wI SW and losses @ -50 BbI/Hr. 170-jts run in hole at OOOO-hrs. Losses at 60 Bbls/hr. 5/20/2007 00:00 - 03:30 3.50 RUNCm p RUNCMP RIH w/4 1/2" completion string. Baker-Iok all joints below Baker 41/2" x 9 5/8" S-3 packer. Run 41/2", 12.6 #,13 CR, Vam Top tubing. MU to 4444 ft-Ib with weight compensation and torque-turn services. Keeping hole wI SW and losses @ -52 Bbl/Hr. P/U and RIH w/218 Joints of 4-1/2" Tubing to 9363'. 03:30 - 05:00 1.50 RUNCm p RUNCMP Establish Parameters: Up Weight- 108k Ibs. Down Weight- 92k Ibs. P/U Joint #219 and ease Unique Overshot over top of Tubing stump to Shear Out Pins at 9386'. Slack off 10k Ibs and shear Shear Pins on Overshot. Continue RIH to 9388' and stack out 15k Ibs. Space out 2' above neutral point in Tubing with 218 Joints. Bottom of completion @ 9384.5' MD. 05:00 - 06:00 1.00 RUNCor P RUNCMP RID Compensator Equipment and Floor to P/U Tubing Hanger and Landing Joint. 06:00 - 08:00 2.00 RUNCOr p RUNCMP MU hanger. PU wt of 107 K#'s, SO wt of 91 K#'s. RIH and land tubing hanger. RILDS. BOLD landing joint. Rig kill line to IA to reverse inhibited SW to annulus. 08:00 - 11 :30 3.50 RUNCor P RUNCMP Reverse circulate 500 Bls of inhibited 140 deg F SW (EC1124A inhibitor) @ 3 BPM and 40 psi. Took 88 Bls to catch fluid. minimal returns to tiger tank. Pump total of 580 Bbls. 260 Bbls returns, lost 240 Bbls to formation during circ out. 11 :30 - 16:00 4.50 RUNCOI P RUNCMP Drop ball and rod. Pressure to 3500 psi w/2 Bbls SW, set packer. Leak in head pin. Break out landing joint. Close blinds, test tubing to 3500 psi and chart for 30 min. Bleed Tbg to 1500 psi. Pressure IA to 3500 psi and chart for 30 minutes. Bleed Tbg to 0 psi and shear DCR valve. Establish circulation both ways. 16:00 - 17:00 1.00 BOPSUF P RUNCMP Dry rod BPV wI FMC. Test from below to 1000 psi and chart. 17:00 - 19:00 2.00 BOPSUF P RUNCMP LID T-Bar, Break and LID Landing Joint. Clear and Clean Rig Floor. 19:00 - 22:00 3.00 BOPSUF P RUNCMP NID BOP Stack. Move and layover on BOP Cradle. Clean up inside of Tubing spool and around Hanger. 22:00 - 00:00 2.00 BOPSUF P RUNCMP Load Tubing Spool Adaptor Flange and Tree into Cellar. N/U Adaptor Flange to Tubing Spool. 5/21/2007 00:00 - 01 :00 1.00 BOPSUF P RUNCMP N/U Adaptor Flange and Production Tree. Torqued Adaptor Flange to 1700 ft-Ibs with all Studs nutted up with full thread engagement plus 1 thread. 01 :00 - 02:00 1.00 WHSUR P RUNCMP Test Tubing Hanger and Adaptor Flange to 5000 psi for 15 Minutes. Flange up 4-1/6 x 1502 X/O to Wing Valve for Testing Tree. Clean Pits. 02:00 - 03:00 1.00 WHSUR P RUNCMP R/U to Tiger Tank Line for Freeze Protecting Well. R/U DSM " Lubricator and X/O to Tree. Pull BPV. LID BPV and Lubricator. 03:00 - 04:30 1.50 WHSUR P RUNCMP P/U T-Bar and install Test Plug in Hanger. R/U Test Pump. Printed: 5/29/2007 12:56:25 PM . . BP EXPLORATION Page 11 of 11 Operations Summary Report Legal Well Name: 15-17 Common Well Name: 1 5-1 7 Spud Date: 6/30/1984 Event Name: WORKOVER Start: 5/4/2007 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: 5/21/2007 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/21/2007 03:00 - 04:30 1.50 WHSUR P RUNCMP Attempt to test Tree. Test Plug not holding. 04:30 - 06:00 1.50 WHSUR N RUNCMP Pull Test Plug and examine for damage. Go to DSM to retrieve another test plug. None available. Re-dress test plug. 06:00 - 08:30 2.50 WHSUR P RUNCMP PJSM wI LRS. Pump 110 Bbls diesel down lA, returns from tubing to Tank. 3 BPM, 395 psi. Shut down and U-tube. 08:30 - 10:00 1.50 WHSUR P RUNCMP Run ISA test plug into tubing hanger wI T-bar. Set and test tree to 5000 psi 10K. PulllSA blanking plug from tree and run ISA BPV. Set and test to 1000 psi from below I OK 10:00 - 00:00 14.00 RIGD P POST Rig released @ 10:00. RDMO to DS 11-18. Printed: 5/29/2007 12:56:25 PM VELLHEAD - FMC ,CTUATOR"" AXELSON :B. ELEV - 71' IF. ELEV - :OP= 2997' !ax Angle = 59 @ 10640' )atum MD - 10766' )atum TVD = 8800' SS .S-17Post RWi DRLG DRAFT 113-3/8" CSG, 72#, L-80, 10 = 12.347" I 2499' 14-1/2" TBG, 12.6#, 13Cr-80, VAM TOP 1- 14-1/2" TBG, 12.6#, L-80, Tbg STUB 1- Minimum ID = 3.687" @ -9396'·9550' MILLED CEMENT HOLE 4-1/2" TBG-PC, 12.6#, L-80, .0152 bpf, 10 = 3.958" I 9520' TOPOF7" LNR I 19-5/8" CSG, 47#, L-80, ID = 8.681" I ÆRFORA TION SUMMARY REF LOG: BHCS ON 07/16/84 ANGLE AT TOP ÆRF: 59 @ 10626' Note: Refer to Production DB for historical perf data SIZE I SPF INTERVAL Opn/Sqz DATE 4" I 4 10626 - 10708 0 07/16/84 SLTD 10769 - 10834 SLTD 12/19184 I 17" LNR, 29#, L-80, .0371 bpf, ID = 6.184" I 1 TOP OF 7" SL TD LNR I BOT OF 7" SL TD LNR I PBTD I 7" LNR, SL TD, 26#, L-80, .0383 bpf, ID = 6.276" I TD 2086' ST MD 4 2982 3 5402 2 6943 1 8818 9266' 9287' 9312' -f4-1/2" HES "X" NIP, ID = 3.813" I GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH 2979 11 MMG OCR RKP 4995 41 MMG DMY RK 6113 44 MMG DMY RK 7527 38 MMG DMY RK - 4-1/2" HES "X" NIP, ID = 3.813" 9-5/8" x 4-1/2" BKR S-3 PKR, ID = 3.875" -14-1/2" HES "X" NIP, 10 = 3.813" [ PORT DATE o 05/20/C o 05/20/C o 05/20/C o 05/20/C - UNIQUE MACHINE OV ERSHOT 4-1/2" BAKERPBRASSY 9396'-9550' -fCMT HOLE MILLED (10/18/97),10 = 3.687" I 9519' 9520' 9501' -f9-5/8" X 4-112" BAKER FHL PKR, SQZ 10108/97 -f4-1/2" OTIS XN NIP, 10 = 3.813" I -14-1/2" BAKER SHEAROUT SUB -14-1/2" TUBING TAIL I H ELMO TT LOGGED 06/07/85 I 10618' -i 7" BOT OÆN HOLE PKR I DATE REV BY COMMENTS DATE REV BY COMMENTS 07/29/84 ORIGINAL COM PLETION 03/19/04 MOC/TLH LOWER PA TCH SET 12/19/84 LAST WORKOVER 03/29/06 DA V /TLH STRADDLE PKR CORRECTION 07/08/01 RN/TLH CORRECTIONS 08/14/06 FVR PROPOSED COMPLETION 02/27/03 CNJ/KK CORRECTIONS 05120107 SV GL V CORRECTIONS 02/28/03 JP/KAK DELETE WAIVER SAFETY NOTE 01/27/04 KSB/TLP PULL IBP @ 9433' I 10769' I 10830' I I 10834' I 10850' PRUDHOE BAY UNIT WELL: 15-17 ÆRMIT No: "1840890 API No: 50-029-21126-00 SEe 22, T11N, R14E, 736' FNL & 141' FWL BP Exploration (Alaska) /---,,,, STATE OF ALASKA Al .A OIL AND GAS CONSERVATION COMMISSIO.. REPORT OF SUNDRY WELL OPERATIONS · Operations performed: Operation Shutdown _ Stimulate__ Plugging _ Perforate _ Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator: ARCO Alaska, Inc. 3. Address: P.O. Box 100360 Anchorage~ AK 99510-0360 4. Location of well at surface: 736' FNL, 141' FWL, Sec 22, T11N, R14E, UM. At top of productive interval: 1903' FNL, 1309' FWL, Sec 15, T11N, R14E, UM. At effective depth: At total depth: 1233' FNL, 1624' FWL, Sec 15, T11N, R14E, UM. 5. Type of Well: Development _X Exploratory _ Stratagrapic _ Se~ice _ 6. Datum of elavation (DF or KB feet): 71' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number: 15-17 9. Permit number/approval number: 84-89 10. APl number: 50-029-21126 11. Field/Pool: Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured true vertical Effective Depth: measured true vertical Casing Length Conductor 80' Surface 2428' Production 9764' Liner 1295' 10850 feet Plugs (measured) 8914 feet !0679 feet Junk (measured) 8826 feet Size Cemented 20" 1973# Poleset 13-3/8" 1657 Sx Perm 'E'& 400 Sx Perm 'C' 9-5/8" 500 Sx Class G & 300 Sx Perm 'C' 7" 300 Sx Class G PBTD Tagged at 10679' MD (9/27/97). Measured depth True vertical depth 80' 80' 2499' 2499' 9835' 8297' 10834' 8906' Perforation Depth measured 10626 - 10696'; 10698 - 10708'; 10769 - 10834' true vertical 8799 - 8835'; 8836 - 8841'; 8872- 8906' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, PCT @ 9520' MD. RECEIVED 74 Packers and SSSV (type and measured depth) Baker FHL Packer @ 9416' MD; BOT Openhole Packer @ 10618' MD; Otis DBE SSSV @ 2080' MD. 13. stimulation or cement squeeze summary Intervals treated (measured) Intervals treated (measured) see attached ORIGINAL 14. OiI-Bbl Prior to well operation 1339 Subsequent to operation 1408 5. Attachments 116. I Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _X Gas _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed "~~. ~'~.~~~ F--iff~.~o~ Title: En~ineerin~Supervisor Form 10-404 Rev 06/15/88 Representitive Daily Average Production orln!ection D~a Gas-Mcr Water-Bbl 24408 0 16888 0 Casing Pressure Tubing Pressure - 1058 828 Status of well classification as: Suspended _ Service _ SUBMIT IN DUPLICATE 15-17 DESCRIPTION OF WORK COMPLETED CEMENT SQUEEZE OF LEAKING PACKER 9/27/97: RIH & tagged PBTD at 10679' MD. 10/1/97: MIRU CTU & PT equipment. RIH w/Inflatable Bridge Plug & set the plug in the 7" liner at 9600' MD, to isolate the open perforation intervals & slotted liner located at: 10626- 10696' MD (Zl) 10698 - 10708' MD (Z1) 10769 - 10834' MD (Z1) Slotted Liner Ref. Log: BHCS 7/16/84. Disconnected CT from IBP. PU & pumped gelled sand slurry containing 1250 lbs of 20/40 mesh sand on top of the IBP, to place a sand plug to 9517' MD. POOH w/CT. RD. 10/5/97: RIH & tagged TOS at 9522' MD. 10/8/97: A Cement Squeeze of the leaking Packer was performed as follows: MIRU CTU & PT equipment. Opened IA & pumped 40 bbls of 1% KCI Water down the tubing to establish injection around the leaking Baker FHL Packer at 9416' MD. RIH w/CT to tag TOS, then pumped 1 bbl of Neat Latex Acid Resistive, followed by 9 bbls of LARC w/fibers, followed by 1 bbl of Neat LARC. Squeezed an estimated 5 bbls of cement through the leaking packer into the IA, and attained a final squeeze pressure of 1060 whp. POOH w/CT pumping 57 bbls of 1% KCI Water, followed by 61 bbls Crude. Shut In well w/600 whp. RD. 10/12/97: RIH & tagged TOC at 8209' MD. 10/18/97: RIH w/3.697" milling BHA & milled through cement stringers & cement plug from 8214' to the sand/cement interface at 9522' MD. Continued jetting sand plug from wellbore to 9595' MD. POOH w/BHA flushing sand & cement cuttings to surface w/1% KCI Water. RD. 10/19/97: RIH w/nozzle & jetted remaining sand plug from top of bridge plug w/biozan gel. Latched & deflated the IBP. POOH w/IBP. RD. Returned the well to production & obtained a valid welltest. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9528 Company: 6/21/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S~, 4,-31 95191 ~ 950514, 1 Z).S. 15-17 95180 ~ 950510 1 ,,, ...... ,, · , ,, , SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED Alaska 0il & Gas Cons. Commission Anchorage GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO.9481 Company: 5/25/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 15-37 c:~ ,z~'~'?~ 95177 DUAL BURST TDT-P - .~ I~ ~ ~ 050495 1 cm- __ 0s0 s D.S. 15-11' ~'/-'l_~q,,~ 95178 DUALBURST. TDT-P -~.LPI~,~i,., ~'~ 050495 1 D.S. 2-2 ?/~ - "[ ~"'- STATIC BHP SURVEY '~ 050895 I 1 D.S. 2-3 '~x PROD PROFILE 050795 I 1 D.S. 2-3/'fJ~' DUAL BURST TDT-P 050795 I " 1 D.S. 7-3 '7 ~ .-- I ~ CHEMICAL TUBG.CUTI'ER 0506 95 I 1 D.S. 7-32 ~ c/'- / ~'-~ INFLATABLE BRIDGE PLUG 0507 95 I 1 D.S. 9-17 '7"~.-~,~' PERFRECORD 051095 I 1 D.S. 14-28'~ ~,'.--/~ ~J BAKER IBP RECORD 050895 I 1 D.S. 15-15 ~'~-I~'~. CNT-D 050995 I 1 D.S. 15-17 ~'~" ?~ CNT-G 051095 I 1 D.S. 17-21 ~t?_'-/2-~; !- PROD PROFILE 050995 I I SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie R£C£1V .D AP~ 2. 7 ~995 Alaska 0il & 6~s cons. commission Anchorage NO. 9431 Company: 4/26/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S 2-24 ~'~,-"'7 ! CNT-D 040695 I 1 D.S. 3-13 ~- '7/ PERF RECORD 040795 I 1 D.S. 3-13 i PERF RECORD 0408 95 I 1 D.S~.. 4-.13 '7 ~'- ~ I INJECTION PROFILE 040795 1 1 D.S. 9-10 ~ ~- ~,,%- PERFRECORD 040595 I 1 D.S. 9-12 '7'7 -'7 PERFRECORD 040795 I 1 D.S. 9-23 ~:~ ~ ".~ GAS LIFT SURVEY 040695 I 1 D.S. 15-17 ..... C~'/'l/'g.C~ CNT-G 040595 I 1 D.S. 18-24 4~ c~./.p,._~ TBG. CUTTER RECORD 040695 1 I Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 94O9 Company: 4/13/95 Alaska Oil & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 1-22A 9511 0 MWD GR 01 0995 1 D.S. 15-08A 95148 MWDGR 102693 1 , D.S. 2-24 PROD PROFILE 040395 I 1 D.S. 3-19 INFLATABLE BRIDGE PLUG 040395 I 1 D.S. 5-12 PROD PROFILE 040395 I 1 D.S. 9-25 PERF RECORD 032795 I 1 D.S. 9-25 PERF RECORD 032895 I 1 ,, , D.S. 9-40 PERFRECORD 0331 95 I 1 ,,, D.S. 11-6 PATCH SETTING RECORD 032595 I 1 D.S. 14-3 PATCH SETTING RECORD 040495 I 1 D.S. 15-17 GCT 040595. I 1 D.S. 16-23 COLLAR & JEWELRY LOG 0331 95 I 1 D.S. 16-23 PERF RECORD 040395 I 1 D.S. 18-02A GCT 0401 95 I I I~,C~Ci '~r t..~ " APR SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: ARCO ALASKA, INC. ,"~x F'.O. BOX 100368 ANCHORAGE, ALASKA 99510 DATE: t2-t3-9t REFERENCE' ARCO CASED HOLE FINALS PERF RECORD COLLAR-PERF TUBING COLLAR/JET CUTTER COLLAR (AVA TUBING F'ATCH> DSN PFC PERF FOR TUBING CIRC. HOLES RUN RUN t, 5" RUN RUN RUN RUN RUN ~,. 5" PLEASE SIGN AND RETURN THE ATI'ACHED COF'Y AS RECEIPT OF DATA, HL$ ATLA£ HL$ HL$ HL$ ATLAS HL$ RECEIVED BY~ HAVE A NICE DAY! ~ONYA WALLACE AT0-~529 RECEIVED T R A N,.~lJlsl~ t~ ~[s Boris. gommi~slon Anchorage DISTRIBUTION CENTRAL FILES CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL $ PHILLIPS F'B WELL FILES R & D ~: BPX · ~ $'¥ATE OF ALASKA ..~ TEXACO ARCO AI. ASKA~ INC P~ O· BOX ANCHOI";:AGF, ALASKA 99.5 DATE: i '2-" i 3-9i I.E:F'E:.F~E:./~L,E.. ARCO NAGNE:.'I1C I"APE($) I,,JITH I...I,~'TING(,S') o RUN t 0 ...,JOB:~L533"?'3-.'5 7-.-~8-,, DSN ~ &X RUN t O~ JOB~L..666~8-.2 I.:'L. EAS'E ;~;'tg>J~~/hj ~ND RE~JRN THE ATTACHED COF'Y ~iig I.<i=ULzJ. F'I' UF DATA, R E C E. ]: V E I) ~~ HAVE A N APPROVED ~/ TRANS:~ 9 t ,S'ONYA WALLACE. J)' '" ' ..... A T 0'- t 52 9 Alaska Oil & u D I S 1' R I B U T :'~: CENTRAL. F IL. ES (CH) " ~ F'HIL_L -' · [: H E V R O N -. I"AHHAZ BROWN ~'~ EXXON ~ STATE OF ALASK~ HAE~-~I HU I'~ I'EXACO RECEIVED DEC 1 6 19~1 ~ho~ge' C°~l,~lon I-.I !.. ,S' HLS ARCO ALA2KA, F'.O. BOX ANCHORAGE, ALA2KA DATE' 4t-8-89 REFERENCE' ARCO CASED HOLE FINALS S-2 t 0-t S-89 EPILOG 5- t i ~-28-89 COLLAR/F'ERF 5-48 ~0-28-89 PRODUCTION F'ACKER 6-7 ~ t-2-89 COLLAR/PERF 9-t 0 . ~ t-5-89 COLLAR/PERF ~ 4-S~ ~ ~-29-89 COLLAR/PERF ~ 5-i ~ t ~ -S-89 COLLAR/PERF ~ ~-~ 7 ~ (~°-27-89 CNL-GAMMA ~ 5-2~) t(-)-28-89 CFE t 5'-2~ ~ ¢,-29-89 PAL RUN~ t&2, 5' RUN ~ ~ ~. ' RUN ~ ~ 5' RUN ~, 5' RUN ~ ~ 5' RUN ~, 5' RtJN t, 5" RUN t, 5" RUN t, ~/2.'&i' F,:UN t , RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-t529 & DI~'TRIBUTiON CENTRAL FILES $ PHILLIPS CHEYRON PB WELL F'ILE~' D & M R & D EXTENSION EXPLORATION ~ BPX E,,XON¥ ~ STATE OF ALASKA MARATHON ~ TEXACO MOBIL * THE CORRECTED API$ FOR t5-t7 I$ 50-~29-2tt26. AR'CO ALA.~'KA, INC~ · P~ 0 ~ BOX ANf..',HORA.~E ~ ALASKA 995~ DATE' t ~-'3-89 REFEFk"ENCE:: ARCO MAGNETIC-TAPE(S.) WII'H L..]:ST]:N[;(S) i--2S i0-20'"'89 ' CNL. (S PASS) 2'"'.5 i O-"i 8'~'89 C;NL.-A (~:~ PASS), RCJN 2 2-25 t0.25-89 CNI_ (~ PASS) 4'"'2~2 i 0""21~'"'89 CNL. .(2~ PASS) ~5 .... t'7 t¢-27-89 CNL (5 PASS) FL.E:.A..,E:. SIGN ANI) REI'[JRN THE ATI'ACHED COPY AS RECEIPT OF' DA'fA, A f'I...AS S C H A fl...AS A'T' I... A S' A'f I... A DISTRIBUTION. CENTRAl_ FILES ((;Fl) :~ F'I'4II..L. IF:'S ..FIEVRON F'B WEL. I.. FILE:S,' D & M R & D TAMMAS BROWN (OH) ~ BF'X EXXON .~ STATE OF ALASKA MARATHON I'EXACO MOBIL THE CORRECI'ED AP1 FOR 2-2.5 I$ 50-029-'20766. 'FFIE (]ORRECI"ED AP1 FOR t5-i'/ IS 50-'"529-2ti26. ARCO ALASKA, INC. F'.O. BOX t00360 ANCHORAGE, ALASKA 995t0 DATE' ~-t3-88 REFERENCE' ARCO CASED HOLE FINAL t 15 ii-28-87 CN/GR/MIJLTI-$F'ACE/SND£TNE MATRIX RIJN 2-15 ii-36)-87 CNF'/GR MULTISF'ACE RUN i ~3-2 i t-t 4-87 PDK - i ~-28 t 2-i 8-87 DIFFERENTIAL/TEMPERATURE RUN 3-33 I i-i 5-87 F'DK - t ~,6-i6 it-27-87 CN/GR/MUI..TI-,~F'ACE/SNDSTNE MATRIX RUN t, ~"9-2 i i -22-87 PFC 9-3 i 2-4-87 PFC RL!N i, _~ll-t2 i~-~9-87 F'DK - i ~i2-28 tt-3~-87 CN/GR HI.~LTISF'ACE RUN i ..~~.~.t~=~ I I-29-87 CN/GR HiJi_TI~PACE RiJN t 5-~. ,= I t -~5-87~. PFC RIlN i 6-2~ i t-i 4-87 F'DK - i CHED 'Y A.? RECE.TPT OF .DATA PLEASE SIGN AND RE l ~- H A V E A~m OiJ & GBS COILS. COllllllJSSJOJi · " Anchorage F'ECCY ATO-i 52.9----~ TRAN$ ~88029 0 APPROVED ...... DISTRIBUTION · 5" 5" 5" 5" 5" 5" 5" 5" 5" 5' 5" 5" WAI WAI WAI WAI WAI WAI WAI WAI WAI WAT WAI WAI CENTRAL FILES ~ F'HI'i_L. IF'$ CHEVRON PB WELL FILES D & M R & D EXTENSION EXPLORATION ~ SAF'C EXXON ',~ STATE OF ALASKA MARATHON $ TEXACO MOBIl_ ARCO AI_ASKA, INC P.,O, BOX t00360 ANCHORAGE, AL.A.~K DATE: t~.-~9-87 REFERENCE: ARCO MAGNETIC TAPES W/LI~TING t-t D t t-28-87 6-t6 t t-27-87 t5-t 7 t t-29-8'7 MAGTAF'E~ECC-~2i 7 MAGI'AF'E~EC£;-~2i 6 CN/M,~ MAGTAPE~ECC-;?;2t ,~ CN/M,~ PI.EASE ..~'IGN AND RETURN THE ATTACHED COPY A.~ RECEIPT OF DATA, RECEIVED BY HAVE A NICE DAY! PEGGY BENNETT ATO- t 52? /' ~al<~ Oil & Gas Cons. ¢ommis$1ml ' TRAN,~' J877i i i/~) AF'PROVED DISTRIBUTION ATL. A,~ ATI,.A.~' ATLA,~ (2) CENI'RAL. F I I..E,~ ~ F'H I1...I... I P~ CHEVRON PR WEt.[.. FIL. F.,.~ I) & M F'. MCF'HEE'FER,~ ~ ,.~ AI:'C EXXON ~ ,~TATE OF. AI...A,~KA MARATHON TEXAC~ MOBIL A R C:O A I. a .s k a, ]'. i:~c. A'n c: h o r ...'.:~ g (-:-': ~ A L.a ~ I< a 995~8 · l:he a'l:'tached c:oPY a:3' rec:eil::"t of da'fa., f'-,'.ec e i red By ............................................. ' ............ HAVE A NICE D I ,S.' T I:;: I B O'l' I r) N A R C 0 A I. ,'.-', .'.-.; k a, ]' n c, P~O, Box t0C..~S60 DATE' November 2 (:~, t986 REF'ERENCE' ARCO Cas'ed Hol. e F:inaL 5-'1 2 t i-"i 5-86 CH CNL 6-ti ti-t6-86 CH CNL. t 4-"i 5 t t-t 7-P, 6 CH CNL t 4-'J 9 J f -t~ ~'':-''°z~,~, CH CNL ~5-'~7 t1-t7-86 CH CNL Rut, t~ ~%- ~ F(un 4, Rut, 4, Run ~, $ c h S c h ~" ~" I'i $ch :'g' c h F'Lea.~e sign and ,: return the attached. copy a.s' receipt- ..; ,, of data, HAVE A NICE DAY! Rc,~a'nne Peek ATO- t 529 DI£'TRIBUTiON Oil & (~s G0ns, ~0mmt$$i0n ~ $ Phi LLip~ PB WeLL Fi Le~. R & D "'-,,- Y.,oh i o ~- ..... State' of ALa~'t.,'a · ~ Texaco ARCO Alaska, P.O. Box 100360 Anchorage, Alaska DATE: March it, t986 REFERENCE: ARCO Cased Hole Final DS t3-4 8-29-85 Prod, Loggilng Svc. Run i 5" DS i3-6 2-t6-86 Spinner Survey 5" DS i3-9 i2-i(~-84 Engr. F'rod Logging Run t 5" DS i 3-25 i-~-nn 86 Sp inner Run DS i 3-25 i -3e-B6 Sp inner 5" D~ t3-3e i-t5-86 Collar and F'erf. Run i D~ t4-7 ie-5i-85 PDK i8~ GR-CCL Run i 5' D~ i5-i7 12-i?-85 CNL Mul~i-~pace Run i D~ t5-i7 i~-t?-85 ' Epilog LAC Run i 5' Please sign. and re~urn fhe affached copy as receipf of Received By · HAVE A NICE D Irfna Carlin ATO-i42?F TRAN$ DISTRIBUTION Cenfral Files ~ Phillips Chevron PB Well Fi les D&H R&D Ex~en$ i on Exp lora~ion ~ Sohio Exxon ~ ~--StaCe of Alaska Marathon ~~ Texaco Mob i l dafa. DA DA $ch Cab)co Otis Go DA DA DA ARCO Alaska, Inc. Post Office Box 360 Anchorage, Ale.. ,;~-" 99510 · Telephone 907 ~.",, 5637 December 11, 1985 Reference: ARCO Magnetic Tape w/iisting DS 15-17 11-16-85 CH tape #2264 DA Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429F Trans # 516 DISTRIBUTION Chevron D&M Exploration Services Extension Exploration Exxon Marathon Mobil Alaska Oil .,~ "~;m~lmJssi011 Phillips Prudhoe Bay Files R&D Sohio State of Alaska Texa co ARCO Alaska. Inc. Post Office Box 100360 . Ancf~orage. Alaska 99510 _ · Telephone 907 276 1215 Date: June 27, 1985 Reference: ARCO Pressure Data 15-17 PBU 6-6/7-85 Camco Please sign as receipt of data. Received by ~ /'~~f ]~/~C ~ Alaska oil & Gas Co~s. Commission Anchorage Pam Lambert ATO 1429(~ Trans 190 f- Chevron D&M Expl. Servlces Ext Exp lor. a~:ion ExxOn Mara;hon Mobil .. Phi'l.iips PB well Files R&'D Sohio State of Alaska Texaco ARCO Alaska, Inc. Post Office Box 100360 , Anchorage. Alaska 99510 Telephone 907 276 1215 Date- June 26, 1985 Reference: Pressure Data-ARCO ~5-7 PBU- DUPLICATE COPY- this is a darker copy than the one tha~ was sent previously. 9-10-84 SS'~' 15-7 PBU 9-10-84 SS 15-7.. PBU 9-11-84 SS 15-17 PBU 6-6/7-85 Camco REceived by Alaska Oil & ~s Oons. Cold,mission Pam Lambert ATO 1429C Trans 178 ' Chevron Expl. Services Ext. '~XO.~..-.~ H~rachon PB Well F£1es SOhio $'t~'.&:'~.._.'O,f' Alaska T~c'o ~- ARCO Alaska. Inc. Post Otfice Box 100360 , Anchorage. Alaska 99510 Telephone 907 276 1215 Date' June 18, 1985 REference' ARCO CH Finals 1-25 Spinner 6-7-85 Run 2 5" Camco ~-14-35 Spinner 5-30/31-85 I 5" Camco t5~!7 CCL/Spinner 6-6/7-85 1 5" Camco 18-3 Static Temp. 6-5-85 I 5" Camco 18-3 Dynamic Temp. 6- 3-85 I 5,, Camco Please sign as receipt of data. Rece i ved by Pam Lambert ATO 1429C '~nchor%~e ~'urrmn:$sion Gas Cons ,,,_ ' Trans 166 Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 4, 1985 Mr. C. V. Chatterton Commi ss i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' DS 15-17 Dear Mr. Chatterton- Enclosed is a revised Well Completion Report for DS 15-17. you have any questions, please call me at 263-4944. Sincerely, · Gruber Associate Engineer JG/tw GRU5/L88 Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany RECEIVED APR 0 9 1985 Alaska Oil & Gas Cons. Commissio~ Anchorage /---x. STATE OF ALASKA ~ ALASKA AND GAS CONSERVATION Ct ~ISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well REV I S I ON . OIL E~x GAS [] sUSPENDED [] ABANDONED [] SERVICE [] ....... 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-89 3. Address 8. APl N~mber P. 0. Box 100360, Anchorage, AK. 99510 50- 029-21126 ~ , 4. Location of well at surface 9. Unit or Lease Name 736' FNL, 141' FWL, Sec. 22, T11N, R14E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well I~lumber 1903' FNL, 1309' FWL, Sec.15, TllN, RlZ~E, UH 15-17 AtTotal Depth t';Z~.~ p/Vt., l~-,3,~ ~¢.4)~ F.,3'0 ~ ~,GvuUo~r'' 11. Field and Pool ~..2~,4~- FNL, J.63-8~ FWL, Sec.15, T11N, R14E, UN Prudhoe Bay Field 51 Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial Nol Prudhoe Bay 0i ] Pool 71' RKB] ADC 28306 ACK 2316 12. Date Spudded06/30/84 13. Date T.D. Reached07/14/84 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °f C°mpleti°ns08/02/84 N/A feet MS L 1 17. Total Depth (MD+TVD) 18. plUg Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost ~,3', 1,03-8'3~MD~'TVD 10830'MD, 8927'TVD YES [~[ NO [] 2079 feet MDI 1900' (Approx) :~'2. Type Electric or Other Logs Run DIL/LDT/CNL/GR/Cal, BHCS/GR, CBC/GE, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZEWT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surf 80' 30" 1973# Pole~et, 13-3/8" 72.0# L-80 Surf 2499' 17-1/2" 1657 sx Perm "E" + 400 .x Perm "C" 9-5/8" 47.0# L-80 Surf 9835' 12-1/4" 500 sx Class "G" + 300 .x Perm "0' 7" 29.0# L-80 9539' 10834' 8-1/2" 300 sx Class "G" 24. Perforations open t° Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 10,708' - 10,698' 4-1/2" 9519' 9416' 10,696' - 10,626' w/4 spf, 90° phasing 26. ACID, FRAcTuRE, CEMENT sQuE'EzE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED .... , N/A 27. PRODUCTION TEST ,. Date First Production I Method of OperatiOn (Flowing, gas lift, etc.) 12/31/84J F1 owi ng Date of Test HoUrs Tested PRODUCTION FOR el L-BBC GAS-MGF WATER-BBC CHOKE SIZE GAS-OIL RA'~IO 1/26/85 4.2 TEST PERIOD I~ 440 326.9 0 44° 743 scf/STB ~low Tubing Casing Pressure CALCULATED I~ OIL-BBC GAS-MCF WATER-BBC OIL GRAVITY-APl (corr) Press. 352 -- 24-HOUR RATE ' 2514 1867 0 29.0 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core Chips. None RECEIVED Alaska. Oil & Gas C{.~ns. Cof:'lr[lig~;IOn Form 10-407 JNH/WC45 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. NAME Top Sadlerochit OWe Base Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 9903' 10735' NOT PF TRUE VERT. DEPTH 8352' 5SENT 8873' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. NONE 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Associate Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spa.ces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. item 28: If no cores taken, indicate "none". Form 10-407 ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510 Telephone 907 276 12'15 Date° February 28. 1985 Reference: ARCO Pressure Data i / j j. ,..,.,,.~,.~ ~.,...- . __~, III .... 3j _ll_~lJ "'~ Jl 9-2 Pressure Survey 11-30-84 GO -- 15-17 Pressure Survey 1-25-85 GO 14-9B Pressure Survey 10-28-84 Otis eceipt of data. Received by Pam Lambert ATO 1429C Trans# ~ 5'~ Chevron D & M Expl. Services Ext. Exploration Exxon Marathon Mobil Mobil E & P Phillips PB Well Files R & D Sohio State of Alaska Texaco ARCO Alaska, In(: Post Ottice Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 February 5, 1985 Mr. C. V. Chatterton commissioner State of Alaska Alaska Oil & Gas Conservation Commi ssi on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Well Completion Reports Dear Mr. Chatterton' Enclosed are Well Completion Reports and Workover Well for the following wells' 1E-3 15-16 If you have any questions, please call me at 263-4944. Histories Sincerely, Gruber Associate Engineer JG/tw GRU4/L124 Enclosures RECEIVED F E B 0 6 19~5 Alaska 0il & Gas Cons. Commission Anchorage ~'~ STATE OF ALASKA · ALASKA oIL AND GAS CONSERVATION Cc,,~,MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well RECOMPLET I 0N OIL d(x GAS [] SUSPENDED [] ABANDONED [] SERVICE [] . . , ,, ,, 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-89 '"3. Add~ess' "8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21126 4. Location of well at surface 9. Unit or Lease Name 736' FNL, 1/+1' FWL, Sec.22, T11N, R1/+E, UM Prudhoe Bay Unit. At Top Producing Interval 10. Well Number [ 1903' FNL, 1309' FWL, Sec.15, T11N, R1/+E, UM 15-17 ..At Total Depth 11. Field and Pool r¢~ ~, FNL, ~'1'E' FWL, Sec.15, T11N, R1/+E, UN Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) -I 6. Lease Designation and Serial No.' Prudhoe Bay 0i 1 Pool 71' RKBI ADL 28306 ALK 2316 12. Date Spudded 13. Date T.D. Reached 14. Date Comp.', 'Susp. or Aband. I 15. Water Depth, if offshore 16. 'No. of Completions 06/30/8/+ 07/1/+/8/+ 08/02/8/+I N/A feet MSL 1 ,, 17. Total Depth (MD+TV'D) 18. Plug Back Depth (MD+I'VD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost ~I~'MD,~'TVD 10830'MD, 8927'TVD YES E3 NO [] 2079 feet MD 1900' (Approx) 22. Type Electric or Other Logs Run D IL/LDT/CNL/GR/Cal, BHCS/GR, CBL/GR, Gyro , , 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASINGSIZEIWT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-/+0 Surf 80' 30" 1973# Pol eset, 13-3/8" 72.0# L-80 Surf 2499' 17-1/2" 1657 sx Perm "E" + 400 ~x Perm "C" 9-5/8" 47.0# L-80 Surf I 9835' 12-1~'4" 500 sx Class "G" + 3,~0 sx Perm "C"" 7" 29.0# L-80 9539' 10834' 8-1/2" 300 sx Class "G" .,~ 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECOI~D interval, size and number) SIZE DEPTH SET (MD) PACKER sET (MD) ...... NONE 4-1/2" 9519' 9416' 26. ACID, FRACTURE, CEMENT SQuEEzE, E:TC. I~EPTH INTERVAL (MD) AMOUNT& KIND OF MA+ERIALUSED ,, N/A 27. N/A PRODUCTION TEST Date First ProdUction Method of Operation (Flowing, gas lift, etc.) Date of Test '~tours Tested PRODUCTION FOR OI L-BBL GAS-MCF wATER-BBL CHOKE SIZI~ I'GAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED ' OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl '(corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None J ECEIVi D Alaska Oil & Gas Cons. Commission Arlchnr~a Form 10407 JNN/WC32 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. NAME Top Sad]erochit OWC Base Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 9903 ' NOT PR 10735 ' TRUE VERT. DEPTH 8352' --SENT 8873' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. NONE 31. LIST OF ATTACHMENTS Workover We~. ~. ~! story 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Associate Engineer Signed I~ _~~ ~ Title Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: .If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ~o emil[ dOfl uo ~l~ =','.' I;'J;udo.l 9TH 'a,I, Ihl ,0~8'0I 1t99'1l Oil and Gas Company Daily Well History-Final Report i111111~11~11= Pl~Dire and submit the "FIItM Reeed" on the flrlt Wedneldey after allowable has been assigned or well is Plugged, Abandoned, or ~old. "FILM Rel~' ~louid be submitted atlo when operettonl I~r I~lltlnded for an indefinite or apbreciebll length of time. On worXoverl when an offlCill tilt il not m~eim<l Ul~a completion, report completion and repr~aentMl~l ~ date in blocks provided. The "Final Re~en" fo~m may bi u#d for reporting the entire opMItt~ if ~lma~e Ii avetlible. Olltrtct ICounty or Pariah Alaeka [ North Slope Borough Field Iteaee or Unit ! ADL t128306 Prudhoe Bay "Title Auth. or W.O. no. AYE 203785 I Recomplecion IAccountlng colt center code State Alaska IWell no. 15-17 Nabors 22-E AP1 50-029-21126 Operator I A.R.Co. W.I. ARCO Alaska, Inc. [ 21.66% Spudded or W.O. begun Date Workover 12/11/84 Complete record for each day rebortid Date and depth as of 8:00 a.m. Old TO Releeled rig [2119184 [2/20/84 1400 Ers. Cllsilflcltionl (oil, gel, etc.) O:i.1 Producing methed Flowing Iotal numl3er of wells (active or inactive) on this DSt center prior to plugging ancl [ bendonment of this well J our ] Prior status if I W.O, I 0830 Hrs. 7" @ 10,834' 10,830'PBTD, Rn'g 4½" tbg w/treaterline Wt. 9.0 NaC1 NU new tbg spool, tst pack-off to 5000 psi. RIH & retry Howco BP. RIM w/DP, POOH & LD same. Chg ram~ to 4½", tst doors to 3000 psi. MU tailplpe, FHL pkr/PBR assy& 2 GLM's w/treater strings. Rn 4½" tbg. 7" @ 10,834' 10,830' PBTD, RU Otis Oil/Diesel Rn 4~" tbg; tbg tail hanging up on 7" lnr. RU Camco, rn CCL; no obstructions. LD 1Jt 4½", MU Camco creater lines & Otis SSSV lnes, tst to 5000 psi; OK. Lnd tbg on hgt. ND BOPE, NU tree & tat; OK. Displ tbg w/crude & diesel. PBR @ 9391.98' - XN Nipple @ 9502.16', TT @ 9519.62' TOL @ 9539' RR @ 1400 hfs, 12/20/84. i £C£/vE.D 41aska Oil &A Gas Cons. nchorage C°mm/ssion New]10,830 t TO I DIpth Date IKInd of rig 12/20/84 [ Rotary Type completion (single, dual, etc.) Single Officlll rl~rvolr naml(l) Sadlerochtt Potential telt date Well fiD. Oltl Reelrvoir Producing Interval Oil or gls Teit time Production OII on 'test Gal per day , Pump IiZl, ~M X length i Choke Size T.P. C.P. Water % (3OR Gravity Allowable Effective date corrected ARCO Alaska, Inc, Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 January 14, 1985 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: State Reports - December, 1984 Dear Mr. Chatterton' Enclosed are the December monthly reports for the following wells' DS 6-11 (Workover) 2C-15 1Q-12 DS 11-12 2C-16 2W-9 DS 11-15 2D-13 2W-10 DS 15-16 (Workover) 2E-10 2W-ll DS 15-17 (Workover) 2E-11 2W-12 DS 17-13 2E-12 CPF-1A DS 17-14 2E-13 WSP-3 2X-9 2X-lO If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU3/L68 Enclosures RFCEIVED JAN Gas Cons. Comml~ Anchorage ARCO Alaska. Inc. Is a Subsidiary of AllanticRIchfleldCompany ~ " ~-',, STATE OF ALASKA ALASKA ~,_ AND GAS CONSERVATION CO,,..41SSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. Drilling well [] Workover operation)(~[ 2. Name of operator 7. Permit No. ARCO Alaska, Inc. 84-89 3. Address 8. APl Number P. 0, Box 100360, Anchorage, AK 99510 50- 029-21126 4. Location of Well at surface 736' FNL, 141' FWL, Sec.22, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 71' RKB ADL 28306 For the Month of December ,19 84 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 15-17 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Accepted rig (~ 0830 hrs, 12/11/84. NU lubricator. Test same. Perf tbg. Displaced well to NaCl. ND tree. NU BOPE. Test same. POOH w/4-1/2" tbg. RIH & retrieve PBR/pkr assy. Washed and reamed to lO,830'PBTD. RIH & set BP @ 1506'. Test same. ND BOPE. Changed out tbg spool. NU BOPE. Pulled BP. Ran 4-1/2" tbg w/tail ~ 9520', pkr ~ 9416', & SSSV ~ 2080'. ND BOPE. NU tree. Secured well & RR @ 1400 hfs, 12/20/84. 13. Casing or liner run and quantities of cement, results of pressure tests 20", 91.5#/ft, H-40, weld csg set @ 80'. Installed w/1973# Poleset. 13-3/8"", 72.0#/ft, L-80, BTC csg w/FS ~ 2499'. Cmtd w/1657 sxs PF "E" & 400 sxs PF "C". 9-5/8", 47.0#/ft, L-80, BTC csg w/FS ~ 9835'. Cmtd w/500 sx Class "G" cmt & 300 sx "G" cmt. 7", 29.0#/ft, L-80, BTC csg f/9564' - 10,834'. Cmtd w/300 sxs Class "G" cmt. 14. Coring resume and brief description None 15. Logs run and depth where run None 16. DST data, perforating data, shows of H2S, miscellaneous data None RECEIVED JAN 1 Alaska Oil & Gas Cons. Commission 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. AliChurage SIGNED ~ ~U~f~ ~-L~,~' TITLE Assocl_' a_t._e Eng l_'ne__er DATE i-14-d~ NOTE--Report/~n this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Col~servation Commission by the 15th of the succeeding month, unless otherwise directed. ............ DRN/MRgR Submit in duplicate ARCO Alaska, ,~'~ "~'~ Post Oft,~.~ Bt~x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 October 3, 1984 Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-17 Completion Report Dear Elaine, The total depth of this well is 10,850'MD (8938'TVD), not 10,830'MD as indicated on the Well Completion Report, dated 09/26/84. Also, the correct bottomhole location is' 1233' FNL, 1624' FWL, Sec.15, T11N, R14E, UM Please make these corrections to your records/files. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG/tw GRU1/L73 xc' Well File K. McFarland, ATO 1429 P. Willman, ATO 1069 J. Morrison, ATO 1467A ~tas~a 0il & Gas Cons. Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, In Post Office ,=lOx 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 26, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-17 Well Completion Report Dear Mr. Chatterton: Enclosed are the Well Completion Report and Drilling History for DS 15-17. Also included are two copies of the gyroscopic survey for the subject well. If you have any questions, please call me at 263-4610. Since~~ _ T. L. Fithian Area Drilling Engineer TLF/tw JMM/L03 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ,, '~ ,/~ f(, STATE OF ALASKA ~ ALASK.~, .FL AND GAS CONSERVATION (, 'iUlSSlON ~J ~}'_ WELL COMPLETION OR RECOMPLETION REPORT AND LOG, ,, 1. Status of Well Classification of Service Well OIL [~X GAS [] SUSPENDED [] ABANDONED [] SERVICE []. 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 84-89 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21126 4. Location of well at surface 9. Unit or Lease Name 736' FNL, 141' FWL, $ec.22, TllN, R14E, UN ~T~/O~S~ Prudhoe Bay Unit At ToP Producing Interval I VERIFIED I 10. Well Number 1903' FNL, 1309' FWL, Sec,15, TllN, R14E, UN /$urf.~,.. ~ 15-17 At Total Depth ~./ff. ~ ~ 11. Field and Pool ~FNL, ~ FWL, $ec.15, TllN, R14E, UN Prudhoe Field Bay 5. Elevation in feet (indicate KB, DFi etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool 71' RKBI ADL 28306 ALK 2316 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16, No. of Completions 06/30/84 07/14/84 08/02/84I N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug BaCk Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost [ ~o ~_I~¢~5o'MD~'Z'~TVD 10830'MD, 8927'TVD YES [] NO [] 2203 feet MD 1900' (Approx) 22. Type Electric or Other Logs Run DIL/LDT/CNL/GR/Cal, BHCS/GR, CBL/GR, Gyro 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91 5# H-40 0 80' 30" 1973# Poleset 13-3/8" 72.0# L-80 0 . 2499' 17-1/2" 1657 sx Perm "E" + 400 ,,x Perm "C" 9-5/8" 47.0# L-80 0 9835' 12-1/4" 500 sx Class "G" + 300 .,x Perm "C" 7" 29.0# L-80 9539' 10834' 8-1/2" 300 sx Class "G" 24. Perforations open to ProduCtion (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) NONE ' 4-1/2" 9614' 9511 ' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. N/A PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL~BBL GAs-MCF WATER-BBL CHOKE SIZE I GAs-oIL RATIO TEST PERIO, D I~ I · Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAvITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA ,, Br'ief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None AlasY,~ 0ii & Gas Cons. c0mmiSs~0n' A~ch0rage Form 10-407 Submit in duplicate Rev. 7-1-80 JMM/WC18 CONTINUED ON REVERSE SIDE 29. 30. . :- . GEOLOGi(~ MARINERS " FORMATION 'I:ESTS ' NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochi t 9903' 8352' NONE 0WC NOT PI~ --SENT Base Sadl erochi t 10735' 8873 ' 31. LIST OF ATTACHMENTS ' ' Drilling History: Cvrosconic Survev [2 copies) 32. I hereby certify that the foregoing is' true and correct to the best of my knowledge Signed '7~', ~ - ._ . Title Date INSTRUCTIONS General: This form is designed for sUbmitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ~ Item 1' Classification of Service Wells: 'Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for. depth measurements given in other spaces on this form and in any attachments. "~ Item 16 and 24: If this well is completed .for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indiCa'~e "none". Form 10407 APE 203785 Parker ,176 APl 50-029-21126 0~1~ t ,Mq(~3 W I A~¢O Alaska, Znc. [ 21.661 s--,w.o. -- rm l-- I,"'-''' w'°' Spudd~ 6/30/8~ 2L30 ars. ~ of 800 tm : . . 6/30/84 thru 7/02/84 7/03/84 7/04/84 7/05/84 7/06/84 7/07/8& thru 7/09/84 13-3/8" @ 2499' 2520', (2410'), Cue 13-3/8" cml Vt. 9.00 PV 11, YP 68, PH 9.$, ~ 13.7 Sol Ac'cepC ris @ 1330 hfs! 6/30/84. ~ 20" & diverCer veil @ 2130,hrmr 6/30/84. Drl 17~" hole to 2520'. RU & tn 62 eta, 13-3/8', 72t, L-80 BTC cai v/PC @ 2418', FS @ 2499'. 1657 mx PY "E', followed v/400 mx ~f "C". 13-3/8" @ 2499' 2520', (0'), Prep co re-cmO BOPE Vt. 8.5, PV 4, YP 4, PH 10.5, b~. NC, Sol 2 Pin pIP'i 400 ex PF "C', dimpl ueinIrt8 pup. CIP @ 0630 hfse 7/2/~4. gl) 20*'. gU& tot BOPE; no tat. Chi out aydr~ & re-tat BOPE. 13-3/8" @ 2499' 5145', (2625'), Orll Vt. 8.9, PV 5, YP 3, PH 9.5, ~L 24, Sol 4 Fin cec'l BOPE co 3000 psi. RIH, CaS cut @ 2&18', cie Cml Co 1500 poi; 0[. 00 cue, FC, FS + lO' ney ~OL'U~CiOn. Conduce iotuatton tic co 11.3 PPi EHV. Drl, ]et & our; 12-L/4" hole co 5145' 2674', 3.9', N27E, 2673 TVD, 5 VS, 5N, 3E 3041t, 11.6*, N15K, 3037 TVD, 55 VS, 52N, 22E 3531', 19.9', NI2E, 3508 ~, ~89 Ye, LeaN, ~0E ~026', 33®, NEE,' 39~0 ~, a09 V$, ~02N, 78E &251', 37-1/a®, N13E, 4133 ~ 539 VS, 529N, 13-3/8" @ 2499' 6900', (1755'), Drli Vt. 9.2, PV Il, YP 9, PH 10, ~L 18, Sol 6 Orl & eu~ 12~' hole to 6900~. 5366~, 41.3°, NI2E~ 4997 ~rO, ~244 VS, 1219g, 257E 6103~, 44®, N14E, 5533 TYO, 1750 VS, 17[Og, 373E 13-3/8" @ 2499' 9029', (2129'), Drll Vt. 10.4, PV 23, YP 16, PH 10.5, ~L 5.6, Sol 18 Orl & murv 12~" hole co 9029'. 6653', 44.5', NI6K, 5928 TVD, 2133 VS, 2080N, 472E 7363', 43.9', NI7E, 6437 TVD, 2627 rs, 25~6N, 610E 7922', 40.9', gl6E, 6849 TVD, 3004 Vi, 2917H, 717E 8358', 37.8*, NISE, 7187 TVD, 3280 VS, 3184N, 791K 8677', 38.4', NI7E, 7438 TVD, 3477 VS, 3373go 845E SW ~ . 7/20/84 Orillin$ SuperinCenden~ RECEIVED OCT 0 11984 Aja~ka Oil & Gas Cons. Commission Anchorage ARCO Oi! and ~ Comlmny 0 Dally Well Hl~tcl~/--Intedm Off WOdilOOd~ Of tho wOOll ii1 JIM 044 8~tlq Il BM. ~ ~ JO~ ~ ill4 fOileWm~l JMtilt~ O! O~l 81fiilg IJfltil comololt~, Alaska Not'ch Slope Jtoroush ,em o, u~t ADL #28306 :omo~te record IM OKA O~y whit® drilling or womovM in orO~r~ Field Prudhoe BA~ al ol 8 OO tm. 7/10/84 7/IL/84 7/12/84 7/13/84 7/tale& 7/16/8~ 7/17/84 Alaska ~3-3/8" @ 2~99' 9670', (6at'), DFl~ v/bit #t0 ~t. t0.6, PV 25, Y? IL, PH L0.0, ~ 5.2, So~ 20 DF1 & surv 12-L/&" hole to 9670~. 9112~ND, 390-//2', N22E, 7776~TVI), 37A~V$, S3630, 936~ 9329'ND, ~0.2e, N2&E, 79&3'TVD, 3886VS, S3658, 990~ t3-3/8" @ 2~99' 98&2', (172'), Rn 9-5/8" CsS ~t. 10.7, PV 22, YP Ll, PH 10.0, VL 4.8, Sol 18 Dr1 to 98&2', ¢&C, TOH. BeSin rn'8 9-5/8" css. 9-5/8" @ 9835* FS, (0'), Cbs Over co BridseSel Mc. 10.3, PV LO, YP 8, PH lO,O, 9'I, 14 Rn 252 ~., 9-5/8'*, 47,, ~-80 aTC ~/FS @ 9835* & PC @ 97~8~ w/LO Cmo w/500 tx C1 "G** ~/1~ CFR-2, O,LS~ Ii.q-7. D~sp~ w/c~S pmps, buup pluse C~P @ 1200 hfs 7/11/84, TZH, DO PC & cml ~/9758'-9800'. TsC ce$ @ 3000 pti, OK, Drl cmC Co 9830', CBU (cln pits & belin blds ~ridseSal durinS dr~B & SF~dSeSal. Pup 300 bble H20 & displ 9-5/8" @ 9835' 9991', (156*), Nevi ~t. 10.3, PV 8, YP 8, PH L0,5, ~L 8, $ol 2/18 Dlspl mud w/SrtdseSal drls Eluid, DO cut, FS & LO' new ho~e 98~4'. Conduct formation cs~ to 12.5 DtV, D~ g/9854'-9991~ 9-5/8** @ 9835* 10,850', (859'), POH v/SOS ~. 10.5+, PV lO, YP 16, PH 8~3, ~ 12.2, Sol Drl & surv 8h" hole to 10,850', Il std shore trip, C&C I/loss. RU & rn DLL/LDT/¢NL/GR/CAL, unable to Sec belov POH, cond hole. RU & lo8 DLL/LDT/CNL/GR/CAL/FI)C ~/~0,806' 9835'. Rn BHCS/GR to 9835', GR g/9835'- 13-3/8" shot. POH. 9-5/8" @ 9835' 10,8~0', (0'), G~H v/7" ~. 10.5, PV 9, YP 13, PH 8.5, ~ 11, Sol 16/2 Fin POH & LD SOS. G~H, CBU, Il sod short tr~p, c~rc v/7" 7/20/84 DriXlin~ Superintendent AR38-459..2-8 Numlxt Ill dmly wit1 ntltory Iorml COfll~Cullvlly II they ire p;eplrJd for IKh wM RECEIVED OCT 0 1 1984 .Alaska Oil & Gas Cons. Coi[irnission Anchorage AnCO O# and Gas Conq)my 0 DMly Well Hlltory--lnteflm 7/~8/8& .7/L9/8~ 7/20/84 7/2[/84 thru 7/23/84 (7" @ 10,83&' 10,834', (0'), POH v/8¥' bit Vt. [0.7, PV 9, YP [3, PH lO, VI. [4, Sol L6/2 Fin RIH v/22 Jts blank & 3 slotted, 7", 27t, L-80 tbs v/shoe @ 10,834', LC @ t0,639', Tie-Sack @ 9539'. :mt v/300 ax CL "G" v/52 ECl, [~ C1~-2, .31 Hal&d-24. Dtspl v/J0.4 pp$ 8rid$eSal umtn$ ct8 pep. PU & etd back 3¥' DP. RIH v/5" OP, 8¥' blt & 9-5/8" cs8 scrprs, vsh 9[04'-9536', ce8 t£e back, CBU, POH. 7" @ LO,83&' L0,834' PS, (0'), Cttca Vt. t0.7+, PV 1l, YP [4, PH [0.5, VL [7.6, SoL 5 TOH v/9-5/8' scrpr. T:H ~/6' blt to LC @ [0,50[~, no :mt. Tst :sS, broke dn @ 2600 pst, TOH. TZH ~/ETTS, sec @ 9389' emp ~00 ax C1 'G' cat v/52 KCI, [~ CP~-2, & .3~ Hal&d-2&, 400 pet back press on choke. Dtsp~ v/ri8 peps. g~naL press 1230 pst @ 2 BPM. C~P @ 22[5 hrs~ 7/[8/84. Eel RTTS, TOH & LD. T:H v/9-5/8' scrpt to 8900', :itc, VOC. 7" @ ~0,83&~ ~0,834' PS, (0'), T:H w/9-5/8' blt Vt. ~0.7% PV 9, YP 13, PR 10.5, VL t9.5, 5ol 5 Fin T:H to 9536~, cst lnr lap to 3000 psi, bled to 600 psi, CBU, TOH v/9-5/8' ce8 scrpr. T~H w/7" cs8 scrpr/6' bit to CBU, cftc out Sreen :mt, TOH. T~H v/7" RTTS, set @ 9576', ts: lnr lap, broke dn @ t600 pst, TOH. 7" @ [0,834~ L0,830' PBTO, (0'), POH w/per~ Suns Vt. [0.1, PV 7, YP 6, PH [0.5, ~L 26, Sol 3 LD 7" RTT$. T:H w/9-5/8' RTTS, set @ 9&&4~. Spot ~0 bbls grsh wet @ RTTS. Est iR, press to 3000 psi, held ~itm ~/30 min. RTTS, rev out aO bbls ~rsh vtr~ TOH. T~H v/6" bit & 7" cs& scrpr, htr salt ~l~ @ ~0,080', yah ~/[0,080'-~0,50['. Drl LC @ [0,50~-[0,503', vsh to t0,54~~. Drl ~it~ :mt ~/[0,54[~-[0635 cst cs& to 3000 pst~ bled :o [200 psi/3 mtn. C&C BrtdseSaL, drop vt ~/~0.9-[0.6 PPS, :teac cat, TOH. RU Sch~, tn GR/CET/CBL ~/10,524'-9450~ Rn G~/CBL e/[o,as3~-g&50' T:H v/6" bit & 7" cst scrpr co [0,~52~, vsh to [0,635~, C&C mud to [0.3 ppg. LC ~0,637~-[0~638~, ~it~ cat, [0,638~-~0,720~, cat a salt ~/~0,720~-[0,730~, wsh salt co 10,830~. C~rc & reduce mut vt co ~0.0 pp&, spot 25 bb~ BrtdseSa1 pZu~ Ln 1hr. RU & tn GR/CET/CBL g/~o,70a~-gaso~. Ru Sch~ R~H w/& SPF/90e phastn& per~ guns, salt fill to [0,630~, POH w/perf Suns. 8/07/84 AR38.459-2-B RECEIVED OCT 0 Alaska Oil & Gas Cons. Commission Anchorage Anco 011 md Gm Conqmmy 0 Oimri~t A.l. aska PFudhos Bey Onto lad G~tlXn ii st t.O0 i.m. 7/24184 7/25/84 7/26/84 7/27/84 North Slops 8orouih LMle M U~ ADL t28~06 CoMiW t~o~ IM O~N d~ qiH~M drllh~ Of ~fllow in rime Alaskl IW~ll nO. LIb-I, 7 7" @ 10,834' 10,830' PB'E1), (0'), TOH, LO DP Vt. 9.8, PV 7, YP 5, PH 10.5, bY. 22, Sol 2.5 RIH v/pert Suns, stopped @ 10,632', POH. RIH v/bit & 7" cs8 scrpr, cas ~XX @ L0,687'. m co tO,7tS', C&C, spoc pill, TOH & LD DP. 7" @ t0,$34' 10,830' FBT~, (0'), N~ WK. 9.S, FY 7, YF 5, FN 10.5, V~ 22, So~ 2.5 Fin L~ ~. RU Sch~, per~ ~0,70~'-t0,698' & 10,696'-t0,626' @ 4 SFF/90' phesin[. ~h[ pipe rnmn Ko 4~", tst to 3000 psi. RU & rn 238 J~e, 4~", tZ.6#, ~-~O F¢-O tbs ~o t0,~34'. 3-H perm pk~ @ 9505', XN N~pp~e @ 9594', ~tm o£ tbs @ 9611' TO~ @ 9539' ?" @ 10,834' 10,830' F~T~, (0'), Crude & ~D BOFK, HU & cst cFee co $000 pl~. Disp~ ve~ v/crude, ~o~loved by 70 bb~s d~sseL Pul~ dummy v~v ouc o~ $SSV. v/scd*s v1v, stopped @ 9~87', uaab~e co vck da. sodas vIv sa CCi,. 7" @ 10,83~~ 10,830' FBTD, (0'), Fsh Crude & G~H v/rtL & scd*s vIv, ua&b~s Co Sec ChFu v/3.60 cbs ceil ~oc~coF, ~oc~ced cbs ca~l @ 9~90' @ 9573~ V~. GIH v/3.75" SaSe tinS, stuck @ 9~66' Drop cutter b&~, FOH v/VL. ~H, retry ~sh, FOH into ~ub, cut s~ck~n (t~ nsc in ~ub). ~d ~sh~'S scFiaS, G~H & acc co pu~ ~sh @ 9~20~ v/o success. G~H v/OS &sheiF dn lll~ co &CC to shear ~/~over £sh (SaSs riss ~sh). Tho I~O JO correct lolls ITille 8to8/84 Drtllinl Superintendent AR3B-459.,2-8 RECEIVED OCT 0 1 1984 Anchorage ARCO Oil and Gal Company 4~ Dilly Well Hlelory-Mnel Flelmrt "r! ,: ' ~ ' , . " ' ,n ~w r ,, ' ! '~ ' i' ' $t~te IWMI n~. 15-17 ARCO Alaska, inc. $o~acllo or w O. Oeg~n 7/28/84 co 7/29/8& IA~.co w, 2t.66Z oat, 6/30/8& Spudded al of 800 am 8/03/8& Co~'olete ;~;,);G fOr eleh ~ ~leOfIMI I~louOIlll numlo~r Of we(lll (active of ,nlCtl¥l! Oh thlll 2130 Hrs. J 7" @ 10,834' 10,830' P8~, (0'), L~ Oil in cbl/9.8 NaCl v/30 bbls diesel in ann Coat cryin$ co pull elickln fsh v/no 8uccell, PON. Dispi veil v/700 bbll 9.8+ pp~ gaCl Co kill veil. ~ tree, gU i cst BOPE co 5000 psi. Pull ~" obi series & ~ (3.750 lap rte8 stuck in cop of B~ XO Ibovt PBR.) KIR v/238 3~l, I¥', 12.6~ L-80 BTC ~bs & c~l equip. ~ BOPE, ~ & cst ores co 5000 psi. ~ .!.2000 hfs, 7/29/8i. akr ~ pkr @ 9511' (Cop) - XN nipple @ 9597' (cop) TOL@ 9539' Rn GCT syro f/10,S&0' ~-eurf. 2000 Hrs. CllllilicltiOal (oil. gill. etc.) Oil Producing ,T, Gi--.G4 Florin8 Well riO.OMO Pq#O~r PrOduCing tntel'vll Dll or ~411 Tll| Iil~t Pro~UCtlOfl" ,, COrreCle~ . Drillin$ Superintendent Dr*lIMo. PIllS Il lIKI lY, An38.CSO-3-C INumM4'eli ~lly well I~,llop/ fo~l ¢O,'lle~i~l~M~ Pl q. I II II~t~ M~ OrlOlrO~ fo/ elcn d~41. I 5 RECEIVED OCT o 119S4 Alaska Oil a Gas Cons. Commission Anchorage SUB-SURFA CE DIRECTIONAL SURVEY ~UIDANCE r~ ONTINUOUS r~OOL Company Well Name Field/Location RECEIVED OCT 0 11984 Alaska Oil & Gas Cor, s. ComrnJssion Anchorage ATLANTI, C RICHFIELD COMPANY DRILLSITE t5-17 PRUDHOE,, BAY, I'(ORTH SLOPE. ALASKA Job Reference No. 69422 Logged By: B EUTL ER/JOHNSON Date AUG 2, ].984 Computed By: R. KRUWELL CUSTOq[R bIST[NG A~CO ~I, ASKA INCa PRUDHOE RAY SURVE'~ DKTE: 2 AIIGUGT 1984 METHODS OF CO~PUTA?IO~ TOOL LOCATION: TANGENTIAL- aver'aged devtatlon and azimuth VERTICAL SECT~ONI H~]ZOI~TAb DISTAI~CE PROJEC'YED ONTO. AN AZI~UTH OF NORTH 14 DEG 8 M[N EAST · SCHI,UM~KR(;ER t GCT DIPBCTIUNAL SURVEY CUSTOMER I, IS i'ING ARCO. ALASKA DRI l,f,SI TE: 15-17 BAY NORTH SLOPE, ALASKA SURVEY DAT['~: 2 AUGUST 1'-)84 ~GIN~£~ BEUr[,ER/,7OHNSUN METHODS OF COMPUTATION TUO6 6OCA?IuN{ TANG~N?iAb- averaged oevlation and azlmuth INTeRPOLAtIoN{ LINEAH VERTICAl, SECTIOM{ HORIZONTAL DISTANCE PROJEC~£F:V ONTI) AN AZIMUTH OF NORTH 14 DE:G 8 MIN EAST COHPUTATION DATEI 5 bF:PTEgBER PAGE ARCO AbASKA XNC. DRILb$ITE 15-17 PRUDHOE NORTH 5LOPE, RbASKA .. I DATE OF SURVEY! 2 AUGU&T 1984 KELb¥ HUSHING EEEVAT1OH: 71.00 FT ENGINEER; BEUTLER/OO~N$Ofa IN'IF'HPUI, ATED YAI.,UE:~ [rOl~ EVEN 100 FEET UF MEAi~UREu DEPTh TPUE SOR-$~A C~UR~E MEA&URFD VERTICAL VER~ICAb DEVIATION AZIMUTH ~EP~H ~PTft n~P1'H D~;G ~I~ D~b M~N VERI'ICAb DOGLEG HECTANGUEAk CO£}RDINAI'E& HORIZ. DEPARTUR~ 0.00 0.00 -71.o0 o 0 N 0 0 E 100.00 100.00 2q. O0 0 8 $ 64 17 E 200,00 200.oo 129,00 0 1~ N 70 12 E 300,00 300,00 229,00 0 6 N 42 26 E 400,00 400.00 329,00 O 10 ~ 65 26 E 500,00 bO0.O0 429.00 0 9 "61 ~0 E 600.00, bO0.O0 b29.00 0 20 N lo 26 E 700.00 699.99 62R.99 0 25 N I 57 N 800.00 799,99 728,99 O 23 N o 23 W 900,00 899,99 82H.99 0 16 N 22 45 E ~000.00 999,99 928,99 0 17 N 3~ 25 E 1100,00 1099.99 102H,99 0 19 N 3b 48 E 1200.00 1199,99 1128,99 0 18 N 3J 20 E 1300.00 1299.9H 122R.98 0 17 N 2U 50 g N 0 41E N 61 6 W S 84 29 w S 6U 20 w S 61 53 w 1400,00 1399.98 1{28.98 0 14 500,00 1499,98 1~29,98 0 12 '1600.00 1599,98 1528.98 . 0 22 1700,00 1699.98 1~29.9~ 0 28 1800,00 1799,97 1728,97 0 33 1900,00 1899,97 182~,97 0 34 O.OO 0.00 0.00 N U.O0 -0.07 0,23 O,u4 5 0.16 -0 04 0.20 0,08 S 0.14 0~15 0.12 0,07 N 0.34 0.3J 0.22 0.20 ~ O 55 0.50 0,14 0,31 N 0~81 OeRU 0,17 Oeb6 N 0,99 ]°55 0,13 1.34 ~ 1.02 2.25 O,qO 2,09 N 0,93 2.75 0.10 2.57 N 1,03 3.22 0.26 3,00 N 1,28 3.71 0,27 3.43 N l.b7 4.22 0.25 J,8B N 1,90 4.72 O,ll 4,32 N 2,16 5.16 0,18 4,75 N 2,25 5.49 U,b4 b,ll N 2,21 5.58 0,49 5.30 N 1.82 5.51 u,17 5.40 ~ 1.12 5,01 0,08 5,11 N 0,25 4.39 0,12 4,09 N O,b4 0.00 N 0 0 E 0.16 ~ 76 39" 0,16 S ol 59 E 0.35 N 79 2 E 0.5~ 14 b9 32 E 0,87 N 68 42 E 1,19 N 56 22 E 1,69 N 37 12 E 2,29 N 24 O E 2,77 N 21 51 E : 26 N 23 4 E 77 ~ 24 39 E 4,32 h 26 7 E a. U3 N 26 32 B 5,26 h 25 20 g 5,57 N 23 21E 5,60 N 18 55 B b,bl N 11 44 E 5,11 N 2 50 E 4,73 N ? 46 W 2000 O0 1999.96 192~.9b 2100 O0 2099 96 2028 96 2200 O0 2199~95 212R:95 2300 O0 2299~95 2228,05 2400 O0 2399.95 232R.gb 2500,00 2499 94 242~.~4 2600,00 2599:93 2528,95 2700.00 2699.U1 2628.81 U 34 $ 70 43 W 0 34 $ 72 8 w 0 27 $ 59 18 W 0 20 5 6 16 W 0 36 S 31 48 E' O 47 S 55 0 E 0 39 N 8J 2~{ ~ 3 50 w 25 54 E N 27 56 E N 24 16 E 2800,00 2799,42 272R,42 b 13 .2900,00 2898,61 2R27.61 9 1 ( ooo ,o '~i00 ~' 30 }:07 3024.07 12 5 3500 O0 ]479;20 3408.20 19 ~ 3600 O0 3573,08 3502.08 21 7 OD N 19 52 E N 15 0 E 5 43 E '1 33 8,46 9 53 .F, 10 47 E N 11 bO E 12 38 12 44 E 3.74 0,24 4.25 N 1.54 3 24 0.08 3,96 N 2.50 2:69 0.20 3,01N 3,34 2.23 0,37 3,22 N 3,b6 1.54 0,19 2.45 N 3.45 0,93 0,14 1,bO N 2,55 O.ql 0,91 1,30 ~ 1.45 5,16 1,10 5,13 N 0 75 13,70 1,34 12,95 N 4~68 26.05 2.26 24,27 N 10,32 42.97 3,76 40.06 b3,]O 2.01 59,27 85.76 1,99 81'75 111,8~ 2,12 107:94 141,49 1,13 137.39 173,05 1.61 168.o6 207,40 3.24 202,50 245,84 2.87 240.25 2B9 27 2,b4 282.71 337:09 3.00 329.38 4.52 N t9 58 4,68 N 32 11 4.92 N 42 44 k 4.87 N 48 37 N 4,24 N 54 35 3.01 N 57 58 W 1,94 N 48 3 5,19 ~ 8 17 £ 13,77 N 19 52 E. 2b,37 N 23 2 E 16 88 ~ 43,47 N 22 51 23 03 E 63,59 N 21 13 E 26 53 ~ 85,95 N 17 58 E 29 50 E 111,9o N 15 17 E 33 81 E 141,49 N 13 49 38 89 ~: 173;09 ~ 12 59 E 45 15 £ 207,47 N 12 34 E 52 69 E 245.96 N 12 22 E 61 90 E 289,41 h 12 21 72.42 E 337,24 N 12 24 E ARCO AbASKA 1NC, URILbSZTE 15-17 PRUDHOE BAY NORTH SLUPE, AbAbKA COMPUTATION DATE{ 5 ~EPTEMfiER PAGE' 2 DATE Or SURVEY1 2 AUGUST 1984 KE[,b¥ RbSH]NG EbEVA~ION{ 71.00 FT .. , ENGINEER{ ~EUTb~R/JOHNSON I~*i'E~PObATED VA/.uES FOR EVEN 100 FEE£ OF MEASURED DEPTH TRUE SOR-$~h COURSE NERSURED VERTICAL D~P~H DEPTH OEP'£H DEG 4000.00 3928.75 ~8§7,7~ 32. 24 4100,00 4012.22 3q41,22 34 25 4200.00 4093.7~ 4022,78 36 15 300,00 4173,28 4102.28 38 39 ~400eO0 4249 86 41/8.9b 40 ~7 4S00.00 4324:94 4253,q4 41 32 4600.00 4399,81 4328,81 41 37 4700,00 4474,~0 4403.50 41 47 ~800,00 4548.97 ( ~00,00 4623,b3 4552,63 41 25 5000 O0 4698,b0 4627.60 41 20 , oo oo 4v .o, 52 O0 O0 4848,11 4777,11 42 2 5300 O0 4922.93 4861.~3 41 0 5400 O0 4998,41 4927.41 41 14 5500 00 5073.18 ~002,1~ 41 56 5600 O0 5147 15 $0'16,1~ 42 26 5700 O0 5220~96 5149.9b 42 5800 O0 5294'47 5223.47 43 4 5900.00 5367.40 5296,40 43 6000.00 5439.89 b]bR.89 43 6100,00 5512.08 544~.08 43 51 b200,O0 5584.30 5~13.30 43 47 6300.00 5656.27 5585.27 43 58 6400.00 5728.13 5667,13 43 58 6500 O0 5799.97 9728,97 44 15 6600 O0 5871,63 6800.6.{ 44 10 6700 O0 5943,38 5872.38 44 4 6800 O0 6015,19 bg44.19 44 12 ~-~00 O0 6087,03 b016,03 43 -~00 O0 .!!~[67 6087,67 44 11 ~g O0 50. 6159 50 43 O0 0 44 6231:44 44 1 7300 O0 6374:~561 b303.35 4345 7400 O0 6'44 5 6375.75 43 21 60 O0 659 26 6522,26 42 42 7700 O0 666 95 ~595.96 42 18 7800 O0 6741.J2 5670.]2 41 4] 7900 O0 6816,44 6745.44 40 VERTZCAh DUGbEG ~CTANbUbRN COORDINRTE$ HOHIZ. DEPARTURE SECTIOh SEVERITY NOHTH/SOUTH EAST/NEST DIST. AZIMUTH - FEET DEf;/100 FEET FEET FEET D~G ~ 12 34 E 388.88 N 12 22 E 443.93 ~ 12 12 E 501,76 ~ 11 37 E 562.35 ~ !1 3 E 626,5b N 10 41E 692,51 N 10 39 E 758,67 N 10 27 E 825,04 N 10 4 E 891.62 N 9 45 g 957,97 N 9 51E 1023.95 N 10 31E 108q.q3 N 10 59 E 1156.51 N lO 46 E 1222,7b N 12 14 E 128~.28 N lJ 4 E 1354.66 N 13 41 ~ 1421.95 , 14 8 E 1489.42 N 14 17 E 1557,2i ~ 14 Jl E i~25.63 N 14 46 E 1694.50 N 15 2 E 1763.71 M 15 20 E 1832.8b N 15 17 E 1902,28 ~ 15 28 E 1911.80 N 15 42 g 2041.33 N 16 5 E 2111,05 N 16 18 E 2180.66 ~ 16 iq ~ 22~0.2U ~ lb j7 E 2319,71 ~ 16 35 E 2389.41 N 10 20 E 2458,92 N 16 16 E 2528.34 N 10 4 £ Z597.7~ N 15 50 E 2666.73 N 15 51E 2734,99 N 15 48 E 2802.80 ~ 15 44 E 2870,~7 N 15 5~ E 2937,20 ~ J5 47 E 3003,18. 1,84 2.27 1,75 2.90 1,24 0,12 0,93 0,72 0,42 0.4! J79.92 N 83,78 E 389.05 N 12 26 E 433,70 ~ 95.67 E 444,12 N 12 26 E 490,21N 108,01E 501,97 N 12 25 E 549.54 N 120.60 E 562,61 N 12 22 E 012,59 ~ 133.15 E 626,89 N 12 15 E 677,46 N 145,61E 692,93 N X2 7 E 742,bl ~ 157,81 ~ 759,20 h 11 59 £ 807,9~ ~ 170-00 £ 825,68 N 11 52 U73,e6 ~ 181.U2 E 892,38 N 11 45 E 939.19 q 193.34 E 958,88 N 11 37 E i 34 0:88 0.73 0.75 1,28 0.59 0,56 0.69 0,80 1004,41 1069,51 1135.04 1200,21 1264,47 1329,2'1 1394,71 1460 18 1525~88 1592,15 204.53 E 1025,03 N 11 30 £ 216,17 E 1091,14 N ii 25 E 228,63 E 1157,84 N 11 23 E 241,10 E 1224,18 h 11 21E 254.26 E 1289.78 N 1, 22 E 268,76 E ,35b ~6 h 11 2~ E 284.45 E 1423 2 N 11 3 300,75 E 1490 83 N 11 38 E 317.47 E 1558 55 N ii 45 E 334,47 E 1626 90 h 11 51E 0.93 0'46 4o 0 13 0:25 0.91 0.83 0.56 1,56 1658,81 1725,70 1792,46 1859,44 1920,47 1993.45 2060,52 2127,39 2194.17 2260,88 387.66 E 1833 405.92 E 1903 424.43 E 1972 443,20 ~ 2~42 462,36 E 2 11 481,86 E 2~81 501,44 }: 2 50 521,17 E 2320 351 80 E 1695 70 N 1! 58 E 369:57 E 1764 63 N 9 0 N 12 12 E' 23 N 1218 E 67 N 12 25 E 76 N 12 38 g 28 74 17 0,64 0.44 0.48 0.52 0,57 0,48 1.~2 0.57 0.61 2327,74 N' 541'08 E 2389.80 N 13 5 E 2394,48 rO 56075 E 2459 26 N 13 10 E 2461,17 N ~80 2527,9! N 99 2594.21 ~ 6~ 2059.~9 ~ b 2725,1~ N 655 27~0,18 ~ 674. 2854.53 N 692 2918.03 ~ 710 ] E 2528 62 N 13 15 E. E 2598 03 h 13 20 g 59 E 2666 94 N 13 24 g 29 E 2735 17 N 13 28 g 87 E 2802.96 N 13 31E 29 £ 2870.50 N 13 35 E 44 E 2937,3i N 13 38 E 42 E 3003,27 N 13 40 E L~r~l'~ l!llil 'I:1 ~[! [:] J COmPUTATiON DATE: 5 ~EPTEM~E~ PAGE 3 ARCO AbAGKA INC. DATE OE SURYE¥1 2 AUGUGT 1984 URIbbS[TE 15-17 K~Lb¥ Bb$~ING Eb£VATIU'J{ 71,00 P~UDHDE NO~TH GbOPE~ AGA~KA .. t ~GtNEERI ~UTbK~/dOHN$ON M£ASUEED VERTICAb VERTTCAb DEVIATLO~ AZIMUTH ~ECTIOH SEVERITY N~RTH/$OUTH EAST/NE$~ DI$£o DEPTH DEPTH OEPfH bEG i4I~ DEG HIN FEET DEG/100 FEET FEET FEE~ DEC ~000000 68q2oj6 6821..]0 40 23 N 15 49 E J068o23 1o. 02 2980005 N 72~,16 E 3068,30 N 13 43'E 8100.00 6968o9q 6~97.q9 t9 36 N 1~ 43 E 3132.45 0096 30~2050 N 74~053 E 3132051 N 13 46 8200,00 7046o43 bq15,43 t8 ~4 N lb 28 E J195.?0 00~5 310Jo45 S 762050 E 3195 7R N 13 48 8300.00 7124048 7053°4~ 38 25 N 15 23 g 3258o19 1o37 3163o68 N ?79°23 E 3258 23 N 13 50 8400.00 7203026 '1132o2b 37 47 e ]5 19 E 3319o'17 0099 3223.O8 ~ 795o53 E 33~9 BI N 13 51 8500.00 7282.45 721].4~ 37 58 N 15 23 E 3380.83 1.93 3282002 q 8~1052 E 3380 86 N 13 53 7361,O0 7290,00 38 20 ~ le 33 £ 3442.69 10~! 3341.57 ~ ~2a.~S e: 3442 7~ N 13 55 8600000 8700.00 7439.37 7368.37 30 20 N 17 56 E 3504,71 1o28 3400,91 ~ 846,70 E 3504072 k 13 58 E [/ qoo.o000 751'1./8 1446,78 3U 16 Nta 50 E 3566059 0°17 3459,'t'7 ~ 866.37 E 3566,59 N 14 3 000 7596,25 7525.25 38 23 N 19 51E 3628,33 1o72 351~,29 N 886,80 E 3628033 N 14 8 9000°00 7674.25 7603 25 ]8 54 N 21 26 E 3690.50 0,88 3~76o8! ~ 908.99 E 3690,51 N 14 15 9100,00 7751 99 76~0:99 39 16 N 22 19 E 3792.80 0,$3 3035,~] N 932.51E 3752,~3 N 14 23 E 9200000 7829:14 7750.14 39 56 N 23 21E 3815.72 1.53 369~,86 ~ 957.00 E 3815,82 N 14 31E 9300,00 7905.&~ 783a~63 40 0 ~ 24 ~9 F] 38'/9.18 1,20 3752.69 ~ 9~3022 E 3879,36 N 14 40 E 9400.00 7982.1~ 791. i.]b 40 5' N 26 5 E 3942.27 1.3] 3810,77 ~ 1010.96 g 3942 59 N 14 51 OO,OU 805a,19 79d7.19 41 t2 N 2617 g 4005.76 2.22 3850,99 N 1039,79 E 400627 N 15 00000 8132.98 8061.98 4211 N 27 0 E 4070.58 2.31 3928.37 N 1069042 E 407133 N 15 l 9700.00 8206.50 ~13505U 4316 fJ 2755 E 4136.56 1.10 3988056 N 1{.00.59 E 4137 ~2 N 1525 9800.00 8278,73 8207,73 44 ~2 N 2~ 40 E 4203059 0.64 40~9,38 N ~133.54 E 420504 N 1538 9qO0.O0 8350.09 ~27q.09 4444 N 28 8 E 4271.45 1,4! 4110096 N i166.91E 427~ 37 N 1550 E ~0000°00 842044 83~9°44 4558 N 2722 E 4340.52 1.~7 417j,85 N 1200.02 E 434294 N ~6 2 E ~0~00.00 R489:1! 8418.~' 4723 N 2644 E 4411.35 ~.25 4238.55 ~ ~233.~4 E 441429 N ~6 ~3 E 10200000 8555 '15 54U~,75 49 4 N 2550 E 4484020 2,16 4305,j5 N 1266024 E 448769 N 1623 10300.00 ~619:78 854~,78 5[ 26 N 2517 E 4559.48 2086 43740~1N 1299.46 E 456353 N 16 10400.00 8681 O0 8610.00 53 5 N 2436 E 4637.13 2.59 4440.28 ~ 133Z,84 E 464175 N 1641 8739:72 N 1649 ~0500.00 8668072 5455 N 24 8 E 4716.78 1.42 4520,02 ~ ~366,19 E 4721098 ~0600000 8796.~ 872554 55 ~6 N 24 2 E ~797.84 0000 4595 l'l ~ ~399072 E 4803o62 N 1656 ~0700.00 8853,~/ 8782:27 5526 N 24 2 E 4878.97 0000 4670:38 N ~.43~,27 E 4885,36 N ~7. 3 $0800.00 8909'99 883R°99 5526 N 24 2 E q900.09 0.00 4746,59 N ~466.83 E 4967.1~ N ~7 30,00 892700! 8~56°0~ 5526 N 24 2 E 4984.43 O.O0 4768,~5 N $476.90 E 4991,64 N 17 CO~PdTATION I)A:fF.~ 5 SEPTEMBER PAGE 4 ARCO AbASKA INC. URILL$1TE 15-1'/ PgUOHOE BAY NO~TH SI,OPE~ A6AfiFA .. DATE OF SURVEYt 2 AUGUST 1984 KELb¥ RUSHING EbEVATIUNI 71,00 F~ INI'ERPUI.,ATED VAI, UE$ [.'OR EVE~J 1000 FEET OF HEASURED DEPT TRUE $U!~-$EA C~URSE N~ASURED VERTICAl, VERJ'ICAb ~EVIATIOH AZINUTH -DEPTH DEPTH DEP~'H DF:~ MIN UEG M[N VERTTCA~ DOC~EG N£CTANGUbAR COORUImA~E~ HONZZ. DEPARTURE ~ECTION ~V~PIT¥ NU~TH/~OUT~ EAST/HEST DIS~. AZINUTH FEET DEG/IO0 FEET FEET FEET DEG MZ~ 0.OO 0.OO '71.00 O 0 1000,00 999.99 928.99 0 t7 2000,00 1999,96 1928.00 0 ]4 ~000,00 2997.12 2926,12 lO 59 4000,00 3928,75 ~857,75 32 24 5000,00 4698.b0 4627,60 41 20 6000,00 5439.~9 5368,89 43 37 7000,00 6158,b7 §087,67 44 il 8000,00 6892,3b bq2l.~b 40 23 ~000,00 7674,25 7603,'25 38 54 ,0000,00 8420,44 8349,44 45 58 10830,00 8927.01 8856,0i 55 26 N 0 0 E 0.00 N 34 25 E 3.22 S 70 43 W 3.74 N 19 52 E 42.97 N 12 34 E 388,88 N 9 51 E 1023.95 N 14 46 E 1694950 N 16 35 E 2389,41 n lb 4q E J068.23 N 21 26 E 3690.50 N 27 22 E 4340.52 N 2~ 2 E 4984.43 0.00 0,26 0,24 3,76 1.84 0,81 0,93 0,64 1.02 1.27 0,00 a 0,00 E O,O0 N 0 0 E 3,00 M 1.28 E 3,26 N 23 4 g 4 25 ~ 1,54 N 4,52 N 19 58 W 40~06 ~ 16.88 E 43,47 N 22 51E J79,92 ~ 83,78 E 389,05 N 12 26 E 1004,41 ~ 204,53 E 1025,03 N 11 30 E 1058,Ul ~ 351,80 i 1695,70 N 11 58 E 2327,74 N 541,08 E 2389,80 N 13 5 E 2980,05 ~ 728.1b E 3068,30 b 13 43 E 357b,dl N 908,99 E 3690.bl N 14 15E' 4173 85 N 1200.02 E 4342,94 N 16 2 E 4768:lb ~ 147b.90 E 4991,64 N 17 12 E ARCO AbASKA INC, URlbbSJTE 15-17 PRUDHOE BAY NORTH SIoOPE, AbA~KA NEASUHED VEETZCAL VERTTCAb bEVlAT[OH AZINU?H COMPUTATION DAtEr 5 ~EPTE~aER PAGE 5 DATE OF.SURVE¥I 2 AUGUST 1984 K~Lb¥ RUSHING'EbEYATIUNI 71.00 FT .. ~ ~NGINEER~ BEUTbER/UOH~SON INYEt(PUI.ATED V/~I, UE~ FOR EVEN 100 FEE~ ~JF SUB-SE~ DEPTH VERTICAb OOGbEG EECTANGUbAR COURDIi~A~E5 HOR]Z. DEPARTURE 5ECTIOh SEV~RIT¥ NORTH/SOUTH EA~T/~EST DIST. AZimUtH O.OO 0.On -'11.00 O 0 H O O E 71,00 71o00 0.00 0 5 8 75 54 E 171,00 171.00 10o.00 0 il S 89 13 E 271.00 271.00 20o.00 0 6 N 44 4 E 371,00 371,00 ]O0.OO 0 9 N 59 20 E 471.00 471.00 400.00 0 q N 60 31E 571.00 571.U0 500,00 0 16 N lo 38 E 671.01 571.00 600.00 O 23 N 0 48 E ,01 871.00 RO0.O0 0 16 ~ 18 45 E 71 971.01 971.00 O00.O0 I~II,01 1071.00 1000.00 .01 1171.00 il00,00 127i 02 1271.00 1200.00 137t 02 1371.00 1300.00 1471 02 1471.00 1400 O0 1571 02 1571,00 1500~00 1671 02 1671.00 1600,00 1771 03 1771,00 1700,00 1871 03 1871,0o 1800.nO 1971 04 1971,00 1~00,00 07~ 04 2071,00 2000,00 ~17 05 & 2271 05 ,00 05 237] 0 247 6 O0 2100 OU O0 2200 O0 2300,00 OO 2400,00 0 17 N 29 34 E 0 18 N 35 37 E 0 19 N 38 14 E 0 17 ~ ~b 2 E 0 15 N 3 41E 0 12 ~ 15 7 ~ 0 19 N 51 3 W 0 25 N B5 48 ~ 0 ~3 $ 65 ~5 u 0 34 ~ 64 ] w 0 34 0 34 0 30 0 12 0 31 0 46 2171, 2271, 2371, 247 671, ?*I: FEET DEG/100 FEET FEET FEET DEG MI~ O.O0 0.00 O.O0 N 0.00 E 0,00 N 0 0 E -0.07 0,29 0,02 S 0,21 M 0.21 .$ 84 32 -0.0'1 0,15 0'09 S 0.05 E 0,10 S 28 39 E 0.09 0.17 0.02 N 0.30 E 0,30 N 86 3 E 0.2~ 0.07 0,17 ~ 0,48 F 0,51 N 70 47 E 0.45 0.15 0,28 N 0,74 F 0,79 N 69 21E 0.72 U.2B 0.50 W 0.95 E 1.08 N 62 14 E 1,35 0.17 1.13 N 1.02 E 1~53 N 42 3 E 2.nb 0,18 1,88 ~ 0,96 ~ . 2 11 N 27 1 E 2,61 O.il 2,44 M 0.98 E 2~63 N 21 54 E 5~1 Ob O0 2500,00 0 39 i6,,.142J O0 2600,00 3 24 771, O0 2700,00 5 41 {'~72,08 00 2800,00 7 51 73 43 297i,00 2900,00 10 14 3075 40 3071,00 300o,oo 1.1 49 3177 91. ,~{71.00 3100.00 13 49 338 97 337 ;00 3300,00 17 43 3491 32 3471.U0 3aOn,O0 19 0 3597 77 3571,00 35U0.00 21 3 3706 17 3671,00 3600,00 24 20 3817 56 3771.00 3700.00 27 ~5 3932 18 3871.U0 3800.00 30 46 3.08 0.12 2.88 3,57 O,tO 3,30 4.07 0,40 3,74 4.58 0.~2 4,19 5.03 0,08 4,6{ 5,43 O,J3 5,03 5.54 1.32 5,21 5..5u 0.10 5,40 5.18 0,33 5.22 4.58 0.09 4,B1 S 64 22 W 3.92 0,27 4,36 S 74 15 W 3.38 0,17 4.05'N $ 64 47 W 2,85 0,28 3.'13 S 3b 19 ~ 2.36 0,48 3.35 $ 20 56 F 1.75 0.82 2,71 S 51 28 E 1,07 0,35 .1.83 S 84 6 E 0.82 0 40 1.29 N 2b 23 E 3.37 1!.8 3i49 ~ N 27 21 ~ t0,79 3 06 10 30 N 25 J9 E 21.96 b,O3 20 49 38.13 2.50 35,bl 58,02 1,65 54,39 BO.4b 2,06 7b,43 106 68 ~,58 102,75 IJ7:23 O,b4 133,16 170.22 2.lq IbS.ub 206.60 2.94 201.72 248,3b 2,37 242,72 297.36 2,84 290,~3 393.32 3,0q 34~.22 1.20 £ 3,12 N 22 40 E 1.48 E 3,62 N 24 9 E 1,80 E 4,1'5 h 25 39 E 2.10 E ~,69 N 2~ ~ K 2,24 E 5,14 N 2 K 2,27 E 5,52 N 24 18 E 1,98 E 5,57 N 20 49 E I 35 g 5,56 N 14 0 E 0~5! £ 5,24 ~ 5 33 ~ 0,38 ~ 4,83 k 4 31 W . 1,28 ~ 4,54 ~ '16 18 W 2,22 W 4,62 N 28 45 W 3.12 W 4,86 ~ 39 57 ~ 3.62 w 4,93 N 47 13 W 3.59 W 4,50 N 53 0 W 2,87 # 3,41 N 57 29 W 1,77 ~ 2,19 N 53 51W ,06 W 3,49 N 0 55 W 8,29 E 10.81 ~ 17 42 E .58 K 22,21 ~ 22 42 E 15.14 E 38 60 N 23 5 E 21.61. E 58 53 H 21 40 E 25.99 ~ 80 72 ~ 18 46 E · 28,83 E 10b 72 N 15 40 E 33.16 E 137 23 ~ 13 59 E 38,4~ E 170 25 h 13 2 E 45.01E 206 6~ h 12 34 E 53,20 ~: 248 ~ ~ 12 21E 63.6~ E 297.52 ~ 12 21E 76.U0 E 353.48 h 12 24 E COMPUTATION DA'~£1 5 ~EPT~M~ER PAGE 6 ARCO AbASKA IHC. URII, b~ITE 15-17 PRUDHO~ BAY NORTH SI.OPE, AbA~KA .. I DATE OF SURVEY1 2 AUGUST 1984 KEI, b¥ RUSHING EbEYAI'ION: 71,00 IN'I'Ei4PUI.ATED V~[,UE5 FOR EVEN l OO FEEl UF SUB-SEA DEPTH TRUE SUR-$E~ COURSE NEA$URED VERTICAL VERTICAb DEVIATION AZlPUTH DEPTH DEPTH D~PTH DEG MI~ DEG VERTYCRb DOC;bEG R~CTANGU[,aR COORDINATE5 ~ORIZ. DEPARTURE &ECTION S~VER1T¥ NORTH/&OUTH ERST/NE&Z DI81'. AZIMUTH FE~T DEG/100 FEET F~Y~ F~ET DEG {IN ~050.34 3971.00 3900.00 33 25 4171.84 4071,U0 400o,00 35 42 42 .oe ,oo.oo 4428 ,06 4271.00 4200.00 41 1] 4561,51 4371,00 4300.00 41 28 4695,31 4471,00 ~400o00 41 46 4829,58 4571,00 4500,00 41 44 4963.24 4671o00 4600,00 41 27 5096.52 4~]1o00 4700,00 41 26 73 ,80 4871.00 4SO0,O0 41 54 0 ~]6],62 4971,00 4900.00 41 0 5497.07 5071o00 5000.00 41 54 5632,31 5171,0o 510o,00 42 25 5767,93 5271,00 5200 O0 42 47 5904,~5 $371,00 5]00~00 4~ 23 6043,05 5471,00 5400,00 43 49 b181,61 5571,00 5500.00 43 q! 6320,48 5671,00 6600.00 44 2 6459,59 5771,00 5700,00 44 5 b599,12 5871,00 5900,00 ~4 10 N 12 26 E 416,24 1.99 ~ 12 16 E 485.20 2.10 ~ 11 39 E 5b0,52 2.76 N 10 57 E 644.99 0.77 ~ lO 33 ~; 733.20 0.54 N 10 2q E 821,92 0,77 N 10 h E 911.30 0,53 N 9 43 E 999.75 0.9]. ~ 10 29 E 1087.62 1,38 N 10 57 E 1177.09 1,25 N 11 50 E 1264,37 N 13 2 E 1352.'11 N i3 54 E 1443.74 N 14 17 E 1535,35 ~ 14 30 E 1629.03 ~ 14 50 E 1724,27 N 15 16 E 1820.16 N 15 23 E 1916,50 N 15 43 g 2013,17 U 16 5 E 2110.44 $Obeb4 N 89.73 E 41b.42 474.03 N 104.50 E 485,4! N 12 25 630.71N 136.68 E 645.34 N 1213 717,53 ~ 153,0g E 73J,68 N 12 2 ~04,92 N 169,43 E 822,55 ~93.~9 N 185.27 E 912,11 980.49 N 200,42 E 1000.76 1067.24 N 215.75 E 1088.83 k 11 25 1155,27 N 232,58 E 1178,44 1,51 1,14' 1327,36 N 0,70 1,16 0.72 0,36 0,~2 0.73 0.73 0,8~ 1241,07 N 249,24 E 1265,85 N 11 21 g 268,32 E 1354,21 N 11 25 E 1415.87 N 289.65 E 1445,19 k 11 33 E 1504,09 N 312'07 E: 1536,71 N 11 43 E 1595.44 N 335:33 E 1630,30 N 11 52 g 16~7,59 N 359.42 E 1725 44 N 12 1E 1780,21N 384'30 E 1821:21 N 12 10 E 1873,~b N 409,68 [~ 1917,44 N 12 20 E 1966~3~ N 435,58 E 2013,99 N 12 29 E 2069~9~ N 462.i9 E 2111,14 N 12 38 E 6738 43 5971.00 bq00.0o 44 5 6877 75 6071,00 bO00,00 43 58 7017 ,B 6171.00 0100.00~ 44 7 71 56 31 .6271,00 6200.00 44 0 7295 37 6371,00 6300,00 43 45 7~33,31 6471'00 6400,00 43 11 oo.oo42 705147 6671,00 6600.00 42 16 78~9.70 6771,00 6700.00 41 27 ~,7q71,92 6871,00 6800,00 40 29 ,,,,.oo oo.oo 7071,00 '1o00,00 38 46 8]59 14' 7171,00 7100.00 ]7 55 8485 51 7271 O0 720o,00 37 45 8612 75 737, 00 7300,00 38 23 8740 36 7471 00 ~400.00 38 23 8867 79 7571 00 7500,00 38 20 8995 82 7671 00 7600,00 38 55 9124 56 7771 00 7700,00 39 22 9254 77 7871,00 7800,0~ 40 P ~ 1o 23 F 2207.3b N 16 30 E 2304,30 N 16 32 E 2401.30 N 16 8 E 2498,01 N 10 4 E 2594,58 N 15 57 g 2689,56 N 1,5 55 E 2782.23 N 15 43 g 2874,04 N 15 46 E 2963.55 N 15 52 E J050.02 N 15 43 E 3134.11 N 15 28 E 3215.49 N 15 22 E 3294.71 N 15 17 E 3371.95 N 15 46 £ 3450,58 N ld 24 E J529,71 N 19 20 g J608,43 N 21 22 E 3687,89 ~ 22 18 £ 3769 20 ~ 24 3 E 3850~54 0,93 0,90 0.48 0,97 0,55 1,22 1,26 1.25 0,42 1,06 0.80 0,85 1,39 1,15 0,~4 0,79 0,96 0,46 1,45 2153,03 N 489.38 E 2207.95 k 12 48 E 2246,10 N 516,76 E 2304.78 N 12 57 g 2339,21N 544,49 E 2401,74 k 13 6 2432,03 N 571,71E 2498,32 ~ 13 13 ~ 2524,03 N 598,63 E 2594,83 h 13 20 E 2elb,18 N 624 83 E 2689,76 N 13 25 E 2705,34 N 650:25 E 2782.39 ~ 13 30 E 2793,72 N 675,28 E 2874,17 N 13 35 g 2079,B8 N 699o63 E 2963,65 N 13 39 g 2963,1~ ~ 72~.16 E 3050,10 ~ 13 42 g 3044,10 N 745'98 E 3134,18 N 13 46 'E 3122,53 N 767,77 E 3215,54 N 13 48 g 3190,92 N 789,85 E 3294,75 N 13 51E 3273,46 N 809,16 ~ 3J71,98 N 13 53 E 3349,14 N 830'62 E 3450 60 N 13 55 E 3424,72 M 854,54 E 3529:72 N 14 0 E 3499,46 N 880'12 E 3608,43 N 14 7 E 3574'36 ~ 908,03 E 3687.90 ~ 14 15 E 3649,5~ ~ 938,42 E 3768,25 N i4 25 ~ 3726.20 N 971.18 E 3850,68 h la 36 ~ ARCO ALASKA INC. DRII, L$1TE 15-11 PRUDHOE BAY NORTH SLOPE~ ALASKA COMPUTATION DATE: 5 SEPTEMBER PAGE DATE OF $URVEYI 2 AOGUST 1984 K~I, LY BUSHING ELEVATION{ 71,00 .., ENGINE~R~ BEUTbEH/dOHNSON iNTERPOLATED VALUES FOR EVE}' 100 FEEL UF SU~-SEA ~EPTH TRUE SUB-SEA COURSE MEASURED VERTiCAl.. PERI{CAb DEVIATION AZIMUTH DEPTH DEPTH OEP'iH -OEO ~]U DEG SECTION SEVERITY NORTH/SOUTH EAST/WEST DXST, AZIMUTH FE~T DEG/100 FE~:1' FEET FEET DEG 9385 42 7971.00 7900.00 40 3 9517 08 8071,00 8000,00 41 24 9651 53 8171,00 UI00,00 42 ~5 9789 22 8271.00 8200,00 44 7 9929 52 8371,00 8300,00 45 i0073 34 R471,00 8400,00 46 59 10223 38 8571,00 850n,00 49 J5 10383 38 8671,00 8600,00 52 55 tn554 97 8771,00 ~700,O0. 5U 26 ( '31 2b 8871,00 8go0,O0 55 26 10830,00 8927,01 8856,01 55 26 N 25 55 E 3933,09 N 26 lq E 4016,80 N 27 18 E 4104 49 N 28 39 E 4196:32 N 27 55 E 4291,67 ~ 2U 59 E 4392,27 N 25 47 E 4501,57 N 24 41E 4624.07 N 24 2 E 4761.31 N 24 2 E 4904.33 N 24 2 E 4984.43 1,11 3802,34 N 1006,84 ~ 3933 39 k 14 49 E 0,34 3879,11N 1044,80 E 4017 35 N 15 4 E 1,'/] 3959,34 ~ 1085,28 E 4105 39 . 15 19 E 0,b]. 4042,79 N 1129,94 E 4197 73 N 15 36 E 1.J4 4129.34 N 117b,72 E 4293 73 ~ 15 54 E 1,93 4221,11 ~ 1224,29 E 4395 07 $ 16 10 E 2 76 ~321Jl N 1273,96 g 4505 19 N 16 25 E 2~29. 4434~21 ~ 1327,30 E 4628"60 N 16 39 E 0,uO 4561,30 N 13~4.61E 4766,82 N 16 53 E 0,00 4693,89 N 1443,76 E 4910,91 N 17 5 E 0.00 4768,1b N t476,90 E 4991.64 N 17 12 E ARCO ALASKA DRZbL~ITE 15-1! PRUDHOE BAY NORTH SLOPE, ALAbKA COMPUTATZON UA~E~ 5 ~EPTE~ER .. I INIERPOI,ATEr) VAhUF:S FOR CHOSEN HORIZONS MARKER K-ID K-5 TOP SAG RI'¢ER TOP SHURL, TK A 'tOP .5HUlaLIR B I'OP GHUBLI~ C TOP SRDLEROCHI'.r TOP ZONE 3 TOP ZONE 2 GAS OIL CONTACT TOP ZONE lB ~ASE SADLEROCHIT PBTD TOTAL DEPTH (DRILLER) MEASUPED DEP[H TVD ~gbOW KB f'RUH K8 71.00 71.00 0o00 7819o00 6755,50 6684°50 ~bgl,O0. 7424.4b 7353.46 9751,0o 8243..4b 8172.46 9799,00 U278.01 820/o01 9842.00 8308.72 8237°72 q864,00 8324.40 8253.40 9903°00 835?°22 8281°22 101.39.00 8515.30 8444.36 10285.00 8610.3'7 8539,37 10430 O0 8698~88 8627.88 lObgl:o0 ~791°44 8'120°44 10735,00 88'13.12 8802,12 10~30,00 8927.01 8~50°01 10830,00 8927.01 8856,01 PAGE DATE UF SURVE¥I 2 AUGU&~ 1984 K~LLY RUSHING ELEVATION: 71,O0 ~NGINEER~ BEUTLER/OOHN~OR 0.02 2866,68 3389.69 4019.53 &048.77 40'15,18 40U8.74 4112,82 4264~3~ 4]~4o04 0.21 695.89 843,10 1117~23 1133.21 1147 64 1154 99 IlL7 90 1266 07 1294 47 4468,20 N 4588.40 ~ 4696°70 N 4768,15 ti 4768°15 a 1342 82 E 1396 70 E 1445 02 E 1476 90 E 1476 90 E ARCO AbASKA .[NC, URICbSITE 15-11 PRUDHnE BAg NORTH SbOPEt AbAbKA ,. DAT~ OF SURVEY1 2 AUGUST 1984 KEI, b¥ P, USHTNG EI,F. VRTIOIql 71,00 ENGINEi::I~I ~KUTbCN/J()HN~ON MARKER ,~£ASURE~ D~P~H TVD SURFACE EOCATION AT RECTANGUbAR COORDINATES NORTH/SUUTH EA~T/~E$~ lOP SaG RIVE~ ~OP 5HURbIK A TOP S~URblg C lOP ~ADLERUCHI~ TOP ZONE 3 TOP ZOnE 2 GAS OIb CONTACT ~'OP ZOaF lb BASE. SAObEROCHIT 9751.00 8243,4e 8172,46 97q9.00 8~78o01 8207o01 q842,00 ~308,72 8237°72 9~64,00 8324°40 8253,40 q903,00 8352,22 8281,22 10139,00 8515,30 8444,jb 102Bb,O0 8610,37 8539oJ7 10430,00 8698,B8 8627,BB 10591,00 b791.44 8720,44 10735,00 8873,12 8802,12 401q,53 ~ 1117,23 E 4048,77 N 1133.21E 4075,18 N 1147,64 E 4088.74 N 1154,99 E 4112,82 N 1167.90 E 4264,33 N 1246.07 E 4364,04 N 1294°47 E 4468,20 N 1342,82 E 4588.40 N 1396,70 E 4696,70 N 1445,02 E TOTAb DEPTH 10830,00 8927,01 885b.0! 4768,15 N 1476,90 E L"~ I~11 m 11 il lI:] i[~ [;1 j SCHLUMBERGER ARCO ALASKA INC. DRILLSITE PRUOHOE BAY NORTH SLOPE, ALASKA AUOUST 2, 1984 TVW PLOT FROM OCT DATA JOB REFERENCE WELL' DRILLSITE 15-.17 SURFACE' LOCATION' 736' FNL & 141' FWL VERTICAL PROJECTION · ~ ......... L..:.--.: ....... ~ ........ : ................................ ~ .................... ! ...Z...: !'"'~ ";'"~ "' **'** ="?"* .... ;"~ ~":"i 'cc: ':. :. ::-iii !:ii!: i! :.!:!:i:ii!i!ii:::::: :: :.ti: ii: :i :i!i!ii:.iii i ii!i!ii:iiiii!!i :iii i'i i iii !'i i:!iiiii!:!ii !! i iii }::: ::: :: -.=.~-.-~ ....... i...~-~--.=---~l ........ ~ ............ +-..~ .................... ~ ....... ~-.,~.+=~...=~ .... _ .... =- :,...:..-~ ......... : ........... ~...= ....... ~-..~...L .~.,.~.,.~ .,~ .......... ~ ............ ~...~...~-,.+,-.~ .... ================================================================================= ......... :::::::::::::::::::::::::::::::"?"'"'""~'"~'"'"'+"" .... .......... ~ ........... ~ ' ' · ...................... ~--'~'-~"-;"+"?'~'"e'+ .... IONND ...... ; ....... PROJECTION ON VERTICAL PLANE OF AZIMUTH IS ~CALEB IN VERTICAL OEPTHS ' HORIZ SCALE = 1/lO00 [N/FT WELL: DRILLSITE 15-17 SURFACE LOCATION: 736' FNL & 141' FWL HORIZONTAL PROJECTION NORTH SO00 4000 3000 2000 1000 - 1000 -2000 SOUTH -~000 -6000 WEST mEF 69422 SCALE = 1/1000 IN/FT "~"~'* ~ .' : : ~~] ~]T : : - : ~ ~ . . :.~ : ~ ~ ; :: ~, . : ~ .·. : ~ ~ ............................................ ............................... ; ........................... ; ......... ; .... ........ j .... ~ ~]]Z]]Z]]Z...]Z,] ~'"'Z"Ti Z' ~'"+ ........ ;'":"';'"+ ........ ~" ' '~" : ..... ' · ~ i...., ................ · .................... , ....... ~ ~ ;~ ~. . . ~....~...~ ;; f.~...;...?:...:...~..;...:...~ ....... ~...~ ~;....;...~ ~:~ ~ ...F-~---~ ...... ,-..~.4 ........ :: .........., ,:'":'"~"~'":'"~"'+'"+ ...... ; ....... +...:...f..f...+...+...~ ....... L.Z.!..;..i..~...:...;...:... ~"'+'"? ....... ; ~ ....., .......... , . ~ ~ ~ .... ~ ~ - . ,...;...~_.~..:...~...;_; ......... ~ ~ - :.~ ............................ · ::. :- ...... ...... :" ::.::".': ::.:.:' :":: :::'" ...~...,...~...;...~.. ~... . ........... ,"-?"': ...~ ...... ;...~...+ ...... ~, ~ .......... t ~ :~ ....... ~...:...,...~ ................. ;....~....~..; ..... ' ' ~ · ' : ~ ' ' : . . . . ~"-{: f-"r-t'-'~ ~ :::::::::::::::::::::::::::::::::: .... :"'""'; . ~.~ ........ ......... · ..~..-~.-.:..,...L.+...;.~.,.~ ....... ~ ....... T"'r"~'"~ ............... ' ~ ; : ! : . ~ . : ' ~i : ' ~ ~ -- ...~...~...~...L.LL:...~..~... . ....~ ..... ::;:: ~ ...:...:...+..~..,~ ' ":/' : --..:.4 ......... .: ............ f...:--:. ;.. ~ ........ ' .... ~ ........... .~'"~. ................. : ................ .--~-..~.-'+ ·: ~ ............... :4 t ......................................... ~'.:.~ : .. , -, ', ........ f...~....f..t...:... .... ;"~'"~: ................... .... ~....~ ........ ~ .................... ~-~: ~:.~:'~::~""~:~:.::----:::-~.::: ::...~: :.:::: ::::-:::-:::::: ~.::::::::::::-:: ::::::::::::::::::::::::::::::: :: :::::::::::::::::::::::::::::::::::::: .:::::::. :. :::.:... ::::.:.: ! ~ ......................................... ~ ....................................... i .............................................................................................................. .... ~ ................................................................................. ~ .............................................................................. ~ .................................. .................................. ~ ............... . ................. f .................. ~ .................................................... ~ .......... ..... ~ ............ ~ ................ + ................... ~ ................... , ................. ; ........................................................ ; .................. , ............ ~ ........ .... , ' ............................. ~ ............. :"~ .............................................. ~Z'..T .T ........ :. ............ ; .................................................. ; ................ ~ .................... ~ ................ ~...~ .......... ~ : ...... · ....................... ~ .......... : .. ........ : ........... ~ .................... i -. ........ ~ ........ ~ ........ ~...~ ..................... ~....~ ....................................... ~,... ........ ! .......................... ......... : ....... ~ ..................... , ................. :. ............ l .......................................................... ~ ................ ~ ....................... · '? r": ....... '"":'"~'"~ ....................... +"-;"'-:--"r' ~ .............. : ....... :'": : ...... ~": ''f ........ : ....~ ...... ~ ..... '. ~ ' ': ~ , ~ t . : ~ : I' . , ~ : : ~T~~ ..... ~" ~T .... ~ ' ...?.~,..;...~...~...~..+..+....~ .......... :...:....~...~.,.; .................... ~...~...~...~...~...~...~.,.~...~,..?..?..~ ........ ?.?..~...~...~ ....... ~ ........ ~..:...~ ...... :. ~...: ....... ...g~ ...... g.., ....... :...,_.~ ....... L..~..~...i...~..L..~...~...~ ........... ~ ........ ~...~,..~...~...~...~ .... ~ ............ ~...L..~...~-~...~ ...... ~...~...~.. ~ ~ ........ ~..~. ~ ........ ~ ......... ~ ........ ~ ...~ ..... ~ ..................................... ..~...~..~...~...L.~...;...;..~ ..... : ........ ;..~...L.;..~....~.-~...~...;..;.~ ~ ~..~. ~ ~ ;.~ ~.~..~...~..~..; ...... ;...~...~...~...~...:..~...L;..;..; ...L.~..; .... :~:. ~ ~. ,..L..~...~-~...L..~...~-.~...; ...... ~-~...~,~.4,.~..L.L..~ ~...~,~.~.~..~ ~..~..~.-~...L.~.-~-.~..~...L.~...~ ...... ;..L~ "'r"~"~"'r'T"T"r"r"T . ~ ~ I . ~ ~ · : ~ ; ; ~/ ~ : i i/ :. ~ ~ i ~ ; ~ ~ ' / ' ' ; ~ ; ~ / . · ..~..,:..~...:...~..~ ......... ~ ........... :.,.~....:....~...~ ............ ' ........ ;.--~,-.,;-4-.-~-.-~,.~...~-..L.~..~ ....... ~.-.F-;-...~.-.+-..:...t ............ ~"-?"'~ .......... ~ .... ~ ...... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ............ ....... ........... , ................ .................... , ................ , .............. , ....... .... :.., ................... , ..... .. ~._~..~.~ ...... ~L..~.~ ~ L..~...~...~...~...;...~.~ ...... :...~....L.~...~ ....... ~...~ ...... '....:,, ~~'r..~.,:,.~....~,.~.. ~. L~..~...~,..~...~...~_.~...;...~...~...~...;..F¢.~,N...~...~...~4...:.4 ....... ~-L~.--~.---.~ ........ ~ ~ ~ · ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ........... ~...~4...~..~.,_~.. .~..~...~...~...~ ................... ~ .............................................................................. ........ ~ ........... ?.~...~..~...~.~_F.~ ....... ~ ............................................. : .................... ............................................................................................... ....~ ........... ~.~...&.~..~..~.......~ ................................................ ; ................. ~ ............... ~ ............ I ........ : ............ , ..................... 1 ......... ~ ........ ?.~...~ ....... +..~4 ....... ~...:...:.4...:...+ ....... + ....... ;.-~...~..+..~ ............ ~...~...~ ..................... ~ ....... ~.,.~ ...... ~ .............. ~ ....... ~ ................................................... t?'''~. ....... ~ ........... ~ ........ ~'"': ......... : ....... f": ........ ~'"+"t ......... :'"'f"~"~'"t"'?"~""~ ...... ?'"i'"?"'"'+"'~'"'~'"~:~':':~'LZZ..L.:~ T'~"T~'":: . 2~.~, ~ - , I : .~' - '. -. , '- ....... ~ ................................ ~~'"~" ?'"; .............................. ~ ~"'~ ........ ~ ....... ' ' ~ '~ ............. ~'"?'"~ ....... ~ ........ ~ ...... ~'"~ ............ ~ ~~ ~ ~] i ~'''~~ ........ ~ ............... : ................................... ' ............. ~ ....... ~ ........... ~ '~'~ -SOO0 -4000 -3000 -2000 - 1000 0 1000 200~$T Suggested form to be inserted in each "Active" well folder to d~.eck for timely compliance with our regulations. ' ' Operator, Well Name and Number Reports and Materials to be received by:' 7-- Date ,Required Date Received Remarks Ccmplet_ion Report Yes Well History Yes /d_, ~t/__.~ " ..~/~_~' Samples : ~ -"PI ..... ,, Core Chips " Core Doscrip~ion Registered Survey Plat f~__~ · Incliner_ion Survey ,~/d7 · Directional Survey ye~.~p/ Drill Ste~n Test Reports ~_~_~~ Prcd~ctidn Test Reports ~f~ ~ ~n.~ ~s , ARCO Alaska, Ir/''~'-''~ Post Officu c,c,x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 28, 1984 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK. 99501 SUBJECT- DS 15-17 Dear Mr. Chatterton- Enclosed is a Sundry Notice for the subject well. We propose to pull the 4-1/2" tubing, clean out to PBTD, and re-run the 4-1/2" completion assembly. Since we expect to start this work on October 7, 1984, your earliest approval will be appreciated. If you have any questions, please call me at 263-4610. Sincerely ,~ T. L. Fithian Area Dril ling Engineer TLF/JG/tw GRU1/L66 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany '~"'-'~" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL [] COMPLETED WE LLxI~ OTHER [] ~-'"~~. 2. Name of Operator ARCO Alaska, Inc, 3. Address P. 0. Box 100360, Anchorage, AK 99510 4. Location of Well Surface; 736' FNL, 141' FWL, Sec.22, T11N, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 71 ' 12. 7. Permit No. 84-89 8. APl Number 50-- 0~9-211 26 9. Unit or Lease Name Prudhoe Bm,v Uni~. 10. Well Number 15-17 11. Field and Pool Prudhoe Bay Field 6. Lease Designation and Serial No. Prudhoe Bay 0i I Pool ADL 282,06 ALK 2.%1R Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: Perforate Stimulate Repair Well (Submit in Triplicate) (Submit in Duplicate) [] Alter Casing [] Perforations [] Altering Casing [] [] Abandon [] Stimulation [] Abandonment [] [] Change Plans [] Repairs Made [] Other [] Pull Tubing ~ Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to perform the following workover on DS 15-17: 1. Kill well. 2. MIRU workover rig. RECEIVED 3. Pull 4-1/2" completion string. 4. Clean out to PBTD. 5. Re-run 4-1Y~" completion assembly. ..... , ~ 8 1984 Alaska 0ii & (;as Cons. Commission Anchorage 6. Secure well and release rig. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. BOP equipment will be tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated Start: October 7, 1984 14. I hereby certify that t~ foregoing is true and correct to the best of my knowledge. Signed ~T' L . Title Area Dri 11 ing Engineer The space be!ow for Commission use Date Conditions of Approval, if any: Approved by Approved Copy Returned COMMISSIONER the Commission Date Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate Form 10-403 Rev. 7-1-80 GRU1/SN64 ARCO ALas'ka, Inc. F'.O. Box i~J~3:360 Anchorage, A Las'l<a DATE: September 'IS, t984 RFFERE:NCE: ARCO Ca.s'ed Hc, Le F:'inaL.s' 3-29-~ 6-2S-84 t S-6---- 6-2S-84 ~S-9~ No Date ~ S-.98~-' 7-8-84 ~ S-98 7-8-84 t'4-28-. 7-'~'~,--~q4 ~ 5'-~ 6" 6-27-84 ~ 5-~ 6~-- 6-28-84 ~ 5-' ~ 6~' 6-28---84 ~ 5-'~ '7~ ~.._"),, .o,, ~ 5"-~ 7" 8-'-2-84 ~ 5 .... ~ 7~ 7--22'-84 ~ 5-i ';'~ '7-2~ -84 ~ 5'-'~ '~' 7--2t -84 ~/~' I. ea.s'e .s i gn and CBL/VD EF'L D:r.L Monitor CNL. CH (E:pither'maL) CNI.. CH ('ThermaL) CCL./Perf Recorcl CCL/F'erf Record GCT Gyro We L L ~;'urvey CBL./VD CCL/Per f Record CCL_/F'er i"' Record CBI../VD GCT Gyro, WeLL ,.,V'urvey C.'. E: T L. og CET Log CBL./VD return the attached copy a:; 'receip'l: of I-lAVE A NICE DAY! I<etLy McF'artand Anc~0rage A'T'C)- i 429F 'I'RAN$ , ~-367 d ata, D I $ I'R I B U l' ]: 0 N Chevron I:::xpLoration Service~' Extension ExpLoration Exxon Getty Marathon Mob i L Mobil E & F' Phi L L ips- F:'ruclhoe Bay WeLL R A D Sohio State of ALaska Fi Le.s' ARCO Alas'ka, Inc. F',O. Box t0-~360 Anchorage, ALaska DATE' Septen~ber t~-' REFERENCE° 'ARCO Magnetic 3-3~ ~8-24-84 OH ~2040 DA ~-~0~5 I)A :~-3:~.-~ 8'--9--84 OH ~.o .... 3-34~ 7-2.4--84 OH tape :~:2~25 DA 6-6:'' 8-.J 6--84 CH/CNE .~,.SJ 878 GO 2-25 ~ ~-26-84 OH ¢:69472 Run ~ Sch J3'-98: 8-.22-.84 CH CNL. ~69494 ......... Run 8 Sch ,.~--98 '-~' '7-8-84 CH DIL .~o,, o-z~,~, ..~,.,~. Run J 3 Sch t~"-9~ 9-5-84 C)l..I L.I~ ...6~4.,.4 Run T Sch i5-i7~ '7.-.t5-.-84 01~' rape $6937(-) ' Run t Sch 5--.2(r 8-t 2-.84 OH ~69448 Run J Sch . EXX~SOI--IIO -- i copy previou.s'l.y .seni: by Schl. u[,~berger. " .,a.se s'~gn and re.['urn '['he a'['tac:hed copy as' receip'[' of data, HAVE A N Z CE ~:,AY ~ . ~ v ~ 7 ~:~4~ Ke I. [y McFar Land Alaska Oil & Gas Cons. Commission ATO-- ~ 429F Anchom~0 TRANS. ~323 DISTRIBUTION (only OH) Ch err on IFxptor~tion Servic:e~ Ex ten.?Jon ExpLore.['ion E x x o n Getty Marathon Mob i [ Mobil E & P Phi L Lip~: F'r ud h ce R&D $ohio State of ALaska Bay WeLL I:ri Le~ (NC] An.swer ) ARC(] AI.a.s'ka, Inc, F'~O, Box ~)368 Anchorage, ALaska 995t0 DATE: Sept'ember t2, ~984 REFERENCE' ARC(3 Open Hole F:inai. s' I>. $'. i5-i7 S-Si '7 t 6-84 CF'L, Cyber Look 7- i 6-84 BHCS .7-i 5-84 DILL./GR 7-i 5-~4 L. DT/GNL/(;R (R~w) '7 .... i 5--84 L. DT/CNL./GR (Po'to) '7- t 6-84 CH 8-.2S-.--84 F'ro log 8.--.2:3--84 BHC/Acou~'t' i log/Gl:( 8-.2S-84 DIFL/GR 8.-2S..-84 CDL/6R 8-.2S'.-.84 CDL/CNL/GR 8-23-84 GR R u n R u n R un R u n 5" R u n R u n R u n R u n R un DA t t t t t 5" 2"&5" 2"&5" 5" 5' '.5" 2" & 5" 2" &.5" 2" & 5" '.5" ~ign and re'l:urr, ~he at'1'ached copy am' receipt HAVE A NICE I)AY~ AI~ Oil & Gas ~ Commissbn K ~ L L y ~ F a r L a n d An~orage ATO-t 429F 'FRANS, ~-3t8 o f d a t' a, D I S'T'R I BUT ]: C)N Chevron Exploration Service~ Extension ExpLorat'ion Ex x on 6ef~y Marathon Mob i l Mobil E: & P Phi I I ip:s F'rudhoe Bay We l. L Sob i o .~'~a~e of ALa.~ka Files STATE Of: ALASKA ~/, ~ - ALASK~''~. AND GAS CONSERVATION (~-~'~vllSSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIC il. Drilling well Workover operation [] 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, AnChorage, AK 99510 4. Location of Well atsurface 736' FNL, 141' FWL, Sec.22, TION, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and serial No. 71' RKB, Pad 40'I ADL 28306 ALK 2316 7. Permit No. 84-89 8. APl Number 029-21126 50- 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. 15-17 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool For the Month of, Jul ¥ , 19,,,,84 ~12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well ~ 2130 hfs, 06/30/84. Drld to lO,850'TD, 07/14/84. Ran OH logs. Ran, cmtd, and tstd 7" lnr. Drld cmt to lO,830'PBTD. Ran CBL. Perforate well. Run 4-1/2" tubing/completion assy. DisPlace well to etude/diesel. RIH w/~auge ring; gauge ring stuck in tbg XO. Fish for same· Kill well w/NaC1. Pull 4-1/2" tubing. Retrieve fish· Re-run 4-1/2" tbg. Secure & RR @ 2000 hfs, 07/29/84. .. 13. Casing or liner run and quantities of cement, results of pressur9 tests 20" 91 5#/ft, H-40, weld conductor set ~ 80' Installed w/1973 ax Poleset ~ · · · 13-3/8" 72 O#/ft, L-80, BTC csg w/FS @ 2499' CIP w/1657 sx Perm"E"&400 sxPerm "C" cmt , · · · 9-5/8" 47.0#/ft, L-80, BTC csg w/FS (~ 9835' CIP w/B00sx Class G cmt+300sx Class C cmt , · · 7" 29.0#/ft, L-80, BTC csg w/9564' - 10,834' CIP w/300 sx Class "G' cmt 14. Coring resume and brief description NONE 15. Logs run and depth where run DIL/LDT/CNL/GR/Cal f/10,806' - 9833'. BHCS/GR f/10,715' - 9833'. GR to 2499'. GR/CBL f/10,704' - 9450'. Gyroscopic Survey. 6. DST data, perforating data, shows of H2S, miscellaneous data Perforate f/10,708' - 10,698' w/4 spf ~ 90° phasing. Perforate f/10,696' - 10,626' w/4 spf ~ 90° phasing. Alaska Oil & Gas Cons. Commission AnChorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. NOTE--Report on this form is required for each calendar month, regardless of the status of operatiOns, and muSt be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10~404 JMM/MR1 9 Submit in duplicate ARCO Oil and Gat ~y O {, , Inllll~llenl: Prepare and lubmlt the '41~II~I;RI~ on the flret Wednaldly ariel, a well Ii IpUdded or worliovlr ol~rltlonl ire Caily wo~k p~lor to ~ Ihe.ld be lummarlzed on the form giving Inclullve datll only. District ICounly. parlllt or borough Alaska I North Slope Borough Field Leto or Unit Prudhoe Bay ADL #28306 Auth, or W.O. no. II'itle AFE 203785 I Drill, Complete & Perforate Wall History - Initial Report - Dally Alaska rail no. 15-17 Parker. #176 APl 50-029-21126 Operator lANCe w.i. ARCO Alaska, Inc. 21.66% Spudded or W.O. bogUnspudded {Data 6/30/84 IH°ur 2130 Hrs. IPrl°rstst"a'sw'°' Data and depth as of 8:00 a.m. 6/30/84 thru 7/02/84 7/03/84 7/04/84 thru 7/05/84 7/06/84 7/07/84 thru 7/09/84 Complete record CDr eaoh day reported 13-3/8" @ 2499' 2520', (2410'), Cmt 13-3/8" cs8 Wt. 9.0, PV 11, YP 68, PH 9.5, WL 15.7 Sol 5 Accept ri~ @ 1330 hfs, 6/30/84. NU 20" & diverter sys. Spud well @ 2130 hfs, 6/30/84. Drl 17¥' hole to 2520'. RU & rn 62 its, 13-3/8", 72#, L-80 BTC csg w/FC @ 2418', FS @ 2499'. M&P 1657 sx PF "E", followed w/400 sx PF "C". 13-3/8" @ 2499' 2520', (0'), Prep to re-Cst BOPE Wt. 8.5, PV 4, YP 4, PH 10.5, WL NC, Sol 2 Fin pmp'g 400 sx PF "C", displ using rig pmp. CIP @ 0630 hfs, 7/2/84. ND 20". NU & Cst BOPE; no Cst. Chg out Hydrl & re-Cst BOPE. 13-3/8" @ 2499' 5145', (2625'), Drlg Wt. 8.9, PV 5, YP 3, PH 9.5, WL 24, Sol 4 Fin tst'g BOPE to 3000 psi. RIH, tag cmt @ 2418', Cst c$g to 1500 psi; OK. DO cmt, FC, FS + 10' new formation. Conduct ..... ~ormatton cst to 11.3 ppg EMW. Drl, Jet & surv 12-1/4" hole to 5145'. 2674', 3.9°, N27E, 2673 TVD, 5 VS, 5N, 3E 3041', 11.6°, N15E, 3037 TVD, 55 VS, 52N, 22E 3531', 19.9n, Ni2E, 3508 TVD, 189 VS, 184N, 40E 4026', 33°, NeE, 3950 TVD, 409 VS, 402N, 78E 4251', 37-1/4°, Ni3E, 4133 TVD 539 VS, 529N, 104E 13-3/8" @ 2499' 6900', (1755'), Drlg Wt. 9.2, PV 11, YP 9, PH 10, WL 18, Sol 6 Drl & surv 12¼" hole to 6900'. 5366', 41.3°, N12E, 4997 TVD, 1244 VS, 1219N, 257E 6103', 44°, N14E, 5533 TVD, 1750 VS, 171ON, 373E 13-3/8" @ 2499' 9029', (2129'), Drlg Wt. 10.4, PV 23, YP 16, PR 10.5, WI, 5.6, Sol 18 Drl & surv 12¼" hole to 9029'. 6653', 44.5°, N16E, 5928 TVD, 2133 VS, 2080N, 472E 7363', 43.9°, N17E, 6437 TVD, 2627 VS, 2556N, 610E 7922', 40.9°, N16E, 6849 TVD, 3004 VS, 2917N, 717E 8358', 37.8°, N15E, 7187 TVD, 3280 VS, 3184N, 791E 8677', 38.4°, N17E, 7438 TVD, 3477 VS, 3373N, 845E Signature For f P p ~ .~, istrtbut~n. · ee Procaduree Manual, 8action 10, Drilling, Pages 86 and 87. IDate I Title 7/20/84 Drilltn8 Superintendent AR3B-459-1 -D Number Iii dally well hist@r/ fOrml Oon#oIJtlvely as they rare prepared, ..... h w, ,, ip:g .... Alaska 011 & Gas Cons. commission AnchoraOo ARCO Oil and Gas Company Dally Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in dsscr~blog work performed. Number all drill stem teats sequentially. Attach description of ell cores. Work perlormed by Producing Section will be reported on "lnlerlrn' sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. Alaska County or Parish JState North Slope Borough Lease or Un t ADL #28306 Prudhoe Bay Alaska Well no. 15-17 Date and depth as of 8:O0 a.m. 7110184 7/1[/84 7/[2/84 7/13/84 7/14/84 thru 7/16/84 7/17/84 complete record for each day while drilling or workover in progress 13-3/8" @ 2499' 9670', (641'), Drlg w/bit #lO Wt. 10.6, PV 25, YP 11, PH 10.0, WL 5.2, Sol 20 Drl & surv 12-1/4" hole to 9670'. 9112'MD, 390-1/2°, N22E, 7776'TVD, 3749VS, S3630, 936W 9329'MD, 40.2°, N24E, 7943'TVD, 3886VS, S3658, 990W 13-3/8" @ 2499' 9842', (172'), Rn 9-5/8" Csg Wt. 10.7, PV 22, YP 11, PH 10.0, WL 4.8, Sol 18 Drl to 9842', C&C, TOH. Begin rn'g 9-5/8" csg. 9-5/8" @ 9835' 9835' FS, (0'), Chg Over to BridgeSal Wt. 10.3, PV 10, YP 8, PH 10.0, WL 14 Rn 252 its, 9-5/8", 47#, L-80 BTC w/FS @ 9835' & FC @ 9758' w/10 Cmt w/500 sx C1 "G" w/l% CFR-2, 0.15% HR-7. Displ w/rig pmps, bump plugs CIP @ 1200 hrs 7/11/84. TIH, DO FC & cmt f/9758'-9800'. Tst csg @ 3000 psi, OK. Drl cmt to 9830'. CBU (cln pits & begin bldg BridgeSal during drlg & circ). Mix BridgeSal. Pmp 300 bbls H20 & displ w/BridgeSal. 9-5/8" @ 9835' 9991', (156'), Navi Drl Wt. 10.3, PV 8, YP 8, PH 10.5, WL 8, Sol 2/18 Displ mud w/BridgeSal drlg fluid. DO cmts FS & 10' new hole 9854'. Conduct formation tst to 12.5 EMW. Drl f/9854'-9991' 9-5/8" @ 9835' 10,850', (859'), POH w/SOS Wt. 10.5+, PV 10, YP 16, PH 8.3, WL 12.2, Sol 18/4 Drl & surv 8½" hole to 10,850', 11 std short trip, C&C f/logs. RU & rn DLL/LDT/CNL/GR/CAL, unable to get below 10,750' WLM. POH, cond hole. RU & log DLL/LDT/CNL/GR/CAL/FDC f/10,806' WLM- 9835'. Rn BHCS/GR to 9835', GR f/9835'- 13-3/8" shoe. PON. 9-5/8" @ 9835' 10,850', (0'), GIH w/7" lnr Wt. 10.5, PV 9, YP 13, PH 8.5, WL 11, Sol 16/2 Fin POH & RD SOS. GIH, CBU, 11 std short trip, circ f/lnr. RIH w/7" lnr. Signature ~ For form preparation and I~stribution see Procedures Manual S~:tion 10, Drilling, Pages 86 and 87 IDate ITitle 7120/84 Drilling Superintendent AR3B-459-2-B Number all daily well history forms consecullvely no. RECEIVED S EP o 5 Alaska Oil & Gas Cons. Cern. mission IlC,lorag,, ARCO Oil and Gas Company Dally Well History--Interim nstructiorle: This form is used during drilling or workover operations. If testing coring, or perforating, show formation name In describing work performed, Number all dr stem tests sequentia ly. Attach description of all cores. Work performed by Producin~ Section will be reported on "Interim' sheets until final completion. Report official or representative test on "Final" form. 1) Submit "lflterlm' sheets when tilled out bul not less Irecluently than every 30 days, or (2) on Wednesday of the week in which oil stying IS set. Submit weekly lor workovers and following setting of o~1 at,lng until completion. District ICounty or Parish 18tats Alaska I North Slope Borough I Alaska Field Lease or Unit ' Well no. ADL t;28306 15-17 Complete record for each day while drilling or workover In progress Prudhoe Ba, 7/18/84 7/19/84 7/20/84 7/21/84 thru 7/23/84 Date and depth as of 8:00 a.m. (7" @ 10,834' 10,834', (0'), POH w/8½" bit Wt. 10.7, PV 9, YP 13, PH 10, WL 14, Sol 16/2 Fin RIH w/22 its blank & 3 slotted, 7", 27#, L-80 tbg w/shoe @ 10,834', LC @ 10,639', Tie-Back @ 9539' Cmt w/300 sx C1 "G" w/5% KCl, i% CFR-2, .3% Halad-24. Displ w/10.4 ppg BridgeSal using rig pmp. PU &std back 3½" DP. RIH w/5" DP, 8½" bit & 9-5/8" csg scrprs, wsh 9104'-9536', tag tie back, CBU, POH. 7" @ 10,834' 10,834' FS, (0'), Circ &WOC Wt. 10.7+, PV 11, YP 14, PH 10.5, WL 17.6, Sol 5 TOH w/9-5/8" scrpr. TIH w/6" bit to LC @ 10,501', no cmt. Tst csg, broke dn @ 2600 psi, TOH. TIH w/RTTS, set @ 9389'. Pmp 100 sx C1 "G" cmt w/5% KC1, 1% CFR-2, & .3% Halad-24, holding 400 psi back press on choke. Displ w/rig pmps. Final press 1230 psi @ 2 BPM. CIP @ 2215 hfs, 7/18/84. Rel RTTS, TOH & LD. TIH w/9-5/8" scrpr to 8900', circ, WOC. 7" @ 10,834~ 10,834' FS, (0'), TIH w/9-5/8" bit Wt. 10.7+, PV 9, YP 13, PH 10.5, WL 19.5, Sol 5 Fin TIH to 9536', tst lnr lap to 3000 psi, bled to 600 psi, CBU, TOH w/9-5/8" cs$ scrpr. TIH w/7" csg scrpr/6" bit to 10,501', CBU, circ out green cmt, TOH. TIH w/7" RTTS, set @ 9576', tst lnr lap, broke dn @ 1600 psi, TOH. 7" @ 10,834' 10,830' PBTD, (0'), POH w/perf guns Wt. i0.1, PV 7, YP 6s PH 10.5, WL 26, Sol 3 LD 7" RTTS. TIH w/9-5/8" RTTS, set @ 9444'. Spot 40 bbls frsh wtr @ RTTS. Est IR, press to 3000 psi, held firm f/30 min. Rel RTTS, rev out 40 bbls frsh wtr, TOH. TIH w/6" bit & 7" csg scrpr, hit salt fill @ 10,080', wsh f/i0,080'-10,501'. Drl LC @ 10,501'-10,503', wsh to 10,541'. Drl firm cmt f/10,541'-10635', tst csg to 3000 psi, bled to 1200 psi/3 min. C&C BridgeSal, drop wt f/10.9-10.6 ppg, treat cmt, TOH. RU Schl, rn GR/CET/CBL f/10,524'-9450'. Rn GR/CBL f/10,453'-9450'. TIH w/6" bit & 7" csg scrpr to 10,452', wsh to 10,635', C&C mud to 10.3 ppg. Drl LC 10,637'-10,638', firm cmt, 10,638'-10,720', cmt& salt f/10,720'-i0,730', wsh salt to 10,830'. Circ & reduce mut wt to 10.0 ppg, spot 25 bbl BridgeSal plug in lnr. RU & rn GR/CET/CBL f/10,704'-9450'. RU Schls RIH w/4 SPF/90e phasing perf guns, salt fill to 10,630', POH w/perf guns. see Drilling, Pages 86 and 87 IOate 8/07/84 Drillin~ Superintendent AR3B-459-2-B ~umber all daily well history forms consecultvely aa they are prepared or each we I. [Pa~e no. RECEIVED SEP 0 5 19, 4 Alaska 0ii & Gas Cons. Commission Anchorage ARCO Oil and Gas Company Dally Well History--Interim Instructions: This form is used during drilling or workover operations. If lasting coring, or perforating, show formelion name in describing work perlormed. Number all drill stem tests sequentially. Attach description of all cores. Work I)erformed by Produc ng Sect on will be reported on "lnllrtm" sheets until final completion1 Report official or representative test on "Flail" form. 1 Submit "lnlerlm" sheets when filled DUI but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string Is set. Submit weekly for workove~ end fol ow ng antt no ot ol att ng untl comp at on. District Icounty or Parish Slate Alaska North Slope Borough I Field ILease or Unit Prudhoe Bay ADL #28306 Complete record for each day while drilling or workover in progrese 7/24/84 Date and depth as of 8:00 a.m. 7/25/84 7~26/84 7/27/84 7" @ 10,834' 10,830' PBTD, (0'), TOH, LD DP Wt. 9.8, PV 7, YP 5, PH 10.5, WL 22, Sol 2.5 RIH w/perf guns, stopped @ 10,632', POH. RIH w/bit & 7" csg scrpr, tag fill @ 10,687', rm to 10,715', C&C, spot BridgeSal pill, TOH & LD DP. 7" @ 10,834' 10,830' PBTD, (0'), ND BOPE Wt. 9.8, PV 7, YP 5, PH 10.5, WL 22, Sol 2.5 Fin LD DP. RU Schl, perf 10,708'-10,698' & 10,696'-10,626' @ 4 SPF/90° phasing. Chg pipe rams to 4½", tst to 3000 psi. RU & rn 238 its, 4½", 12.6#, L-80 PC-O tbg to 10,834'. ND BOPE. 3-H perm pkr @ 9505', XN Nipple @ 9594', Btm of tbg @ 9611' TOL @ 9539' 7" @ 10,834' 10,830' PBTD, (0'), RIH Crude & Diesel ND BOPE, NU & tst tree to 5000 psi. Displ well w/crude, followed by 70 bbls diesel. Pull dummy vlv out of SSSV. RIH w/std'g vlv, stopped @ 9487', unable to wrk dh. RU SOS to rn std'g vlv on CCL. 7" @ 10,834' 10,830' PBTD, (0'), Fsh f/slickln Crude & Diesel GIH w/CCL & std'g vlv, unable to get thru SSSV @ 2200'. GIH w/3.60 tbg tail locator, located tbg tail @ 9590' WLM, XN Nipple @ 9573' WLM. GIH w/3.75" gage ring, stuck @ 9466' Drop cutter bar, POH w/WL. GIH, retry fsh, POH into lub, cut slickln (tl not in lub). MU fsh'g string, GIH & att to pull fsh @ 9420' w/o success. GIH w/OS & shear dn assy to att to shear off fsh #2 f/lower fsh (gage ring fsh). Alaska Well no. 15-17 For form preparation and distr~ution see Procedures Manual Sectiol'r 10, Drilling, Pages 86 and 87' IDate ITitle 8/08/84 Drilling Superintendent AR3B-459-2-B Number all daily well hislory forms ~Pa no, as hey ere prepared for each we . consecultvely ~e RECEIVED SEP 0 Alaska Oil & Gas Cons. CemmissJoo /~,nchor~ge ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after a owab e has been assigned or well ia Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended or an nde nte or apprac able ength o time. On workovera when an official teat ia not required upon completion, report completion and representative test data n bocks provided. The "Fins Report" ors may be used for reporting the entire operation if space is ava lab e. t Accounting coat center code District Slate Alaska North Slope Borough Alaska I County or Parish Field ILease or Unit Prudhoe Bay Auth. or W.O. no.AFE 203785 ITM Operator A.R.Co. W.I. ARCO Alaska, Inc. Spudded or W.O. begUnspudded IDate I Well no. ADL #28306 15-17 Drill, Complete & Perforate Dale and depth as of 8:00 a.m. 7/28/84 to 7/29/84 Complete record for each day reported 7" @ 10,834' 10,830' PBTDs (0'), RR I Tot'el number of wells (active or inactive) on this, cost center prior to plugging and I 21.66% abandonment o! this well Hour. IPrlor status If a W.O, 6/30/84 2130 Hrs. Oil in tbg/9.8 NaC1 w/30 bbls diesel in ann Cont trying to pull slickln fsh w/no success, POH. Displ well 8/03/84 w/700 bbls 9.8+ ppg NaC1 to kill well. ND tree, NU &tst BOPE to 5000 psi. Pull 4½" cbt string & CA (3.750 gage ring stuck in top of BDT XO above PBR.) RIH w/238 its, 4½", 12.6# L-80 BTC tbg & compl equip. ND BOPE, NU &tst tree to 5000 psi. RR @ 2000 hfs, 7/29/84. Bkr FHL pkr @ 9511' (top) - XN nipple @ 9597' (top) TOL@ 9539' Rn GCT gyro f/10,540' WLM-surf. 10,850' (7/14/84) 10,830' Released rig Date Kind of rig 2000 Hrs. 7/29/84 Rotary Classifications (oil, gas, etc.) ~ Type completion (single, dual, etc.) Oil I Single Producing method Official reservoir name(s) Flowing Sadlerochit Potentia~ test data Well no. Date Reservoir Producing Interval Oil or gas Test timeProduction Oil on teat Gas per day Pump size, SPM X lengthChoke size T.P. C.P. Water % t/OR Gravity Allowable EtfacUve date corrected For Iorm preparation and dia~ibution. Drilling Superintendent see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C ~'Number all daily well P las they are prepared history forms conlecutlvaly e no. Dlvllio. Of Atll~tlc~k~hfM4cl~y RECE V'ED SEP 0 5 Alaska 0il & Gas Cons. Commission Anchorage MEMORANOUM TO: FROM: State of Alaska ~S~_OIL A_ND GAS CONSERVATION COMMISSION '~~W~ DATE: CC~ ton FILE NO: ~'Lonn~e C. Smith Commas stoner TELEPHONE NO: Ben ~No:['~)z~rJ. ~ ~'"'"'~ ' SUBJECT: Petroleum. Inspector July 6, 1984 D.11.22 Witness BOPE Test on ARCO's DS 15-17, Sec. 22, TllN,R14E,UM, Prudhoe Bay Unit. Friday, J~e 29, 1984: I depar, ted my home at 1:5,0 pm for a 2:20 pm sH~p and '3'~'20 pm:-~parture via Alaska Airlines Flt. ~61 for Deadhorse, arriving at 5:00 pm. Weather: +41°F, overcast, light wind.. Saturday, June 30, 1984: BOPE tests on Sohio's U-7 were completed, the'""~hb]~Ct 0~""a sepa-r-ate report. Sunday, July'l, 1984: Four SSSV's were retested for ARCO Prudhoe B'a'y U~i~', the--~sUb--~t of a separate report. M~o~n~ay, July 2,_ 198._4.- BOPE tests on ARCO DS 15-17 began at 5:40 pm Tuesday, July, 3, 1984: . and were completed at 8:00 am. BOPE ~-s-t'"rep~'rt- ~sr attached. ~lve hours of down time was recorded changing out malfunctioning annular preventer. Wednesday, July 4, 1984= BOPE tests on ARCO's Kuparuk 2D-12 were ~ompletea; the s~ect- of a separate report. BOPE tests on ARCO's Kuparuk 2H-15 began at 11:40 pm . . . Thursday, July 5, 1984: . . . and were completed at 12..50 am, the ~bje-6t of ~a- separate` 'report. I departed Deadhorse via Alaska Airlines,' Flt. #66 at 9:50 am, arriving in Anchorage at 11:30 am and at my home at 12:00 noon. In summary, I witnessed successful BOPE test on ARCO's DS 15-17. Attachment r~3.fifll A/Rmv 1Cl/79~ o~ #-4 4/81 STATE OF ALASKA ALASKA OIL & GAS OONSERVATION CCMMISSION B.O.P.E. Inspection Report Operator. /~ Well _ D.S,' /~'- LoCation: Sec Dril linq Contractor ~~ Rig Representative. ~/~c ~,a/~< ~ Permit #. ~-~? /~~sing Set @ 29Zf~ ft, Representative /~~ /~w Y~/) LoCation, Genera] Wel 1. Sign C~neral Housekeeping Reserve pit Rig- BOPE Stack Annular preventer · Blind Rams ChOke· Line Valves.__ . H.C.R. Valve Kill Line Valves.. Check Valve... ACCUM[~[ATOR SYSTEM Full Charge Pressure ~ O~ psig Pressure After Closure /~;O~ psig Pump incr. clos. pres. 200 psig. Full Charge Pressure Attained:. / N2 ~:~a-~. ~r~~ ~,:t~ ~ psi~ Controls: Master O/~ Remote ~ Blinds switch cover Kelly and Floor Safety Valves - Upper Kelly. Test Pressure ~--~ Lower Kelly. Test Pressure =~ Ball Type . Test Pressure Inside BOP Test Pressure Choke Manifold Test Pressure TeSt Pressure Test Results: Failures. No. Valves.__ / No. flanges 30 Adjustable Chokes Hydrauically operated choke · Repair or Replac~nent of failed equipment to be made within, days and Inspector/ccmmission office notified. Di stribut ion orig. - AO>C cc - OPerator cc - Supervisor Inspector Z~ ~~~~~ min /F sec. min ~'.k. sec. ARCO Alaska, Inc..?''~'' Post Office b,~x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 28, 1984 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commi ss i on 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-17 Well Dear Mr. Chatterton: ARCO Alaska, Inc., requests an exception to Rule 3(f) of Conservation Order No. 145 and Prudhoe Bay Field Rules to be able to complete the subject well using a slotted liner. The use of a slotted liner is proposed to provide additional information on completion techniques in the Sadlerochit formation. Such a completion technique should allow increased production in low potential wells. We have filed the application for Permit to Drill DS 15-17, the required $100 filing fee, and a Sundry Notice changing the completion to a slotted liner. Attachments to the application included a plat detailing the section and plan views of the proposed well course, a sketch and description of the BOP equipment, and a sketch of the surface hole diverter. We anticipate being ready to run this completion on July 18, 1984. Your earliest approval would be appreciated. Sincerely, T. L. Fithian Area Drilling Engineer TLF/JFM/tw JFM/28 RECEIVED JUN2 8 Alaska Oil & (~a; Cons. Coami~lO~l Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA .-'~ ALASKA .~,L AND GAS CONSERVATION C~ .,,MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL COMPLETED WELL [] OTHER [] 2.NameARcoOperatorof 7. Permit No. Alaska, Inc. 84-89 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21126 4. Location of Well Surface: 736' FNL, 141' FWL, Sec.22, TllN, R14E, UM Target: 1320' FNL, 1320' FWL, Sec. 15, TllN, R14E, UM 5. Elevation in feet (indicate KB, DF, etc.) RKB 71', Pad 40' 12. I 6. Lease Designation and Serial No. ADL 28306 ALK 2316 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 15-17 11. Field and Pool Prudhoe Bay Field Prudhoe Bay 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing ]~ Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to produce the lower most (Zone 1) section of the Sadlerochit interval through an uncemented slotted liner. The slotted liner will be 7", 32#/ft, L-80, BTC casing with 0.058" slots cut in th pipe body and will be run only across the Zone 1 portion, approx, the lower 150' of the liner string. The remainder of the liner will be conventional 7", 29#/ft, L-80, BTC casing from the top of the slotted liner to the tieback sleeve. An external casing packer (ECP) will be run between the conventional and slotted liner. Class "G" cement will be circulated through a stage collar above the ECP to the top of the line .ff;-~---' of The well will remain unperforated and produced only through the slotted liner. Exact production intervals the slotted liner will not be determined until open hole logs are run on this well. These intervals will be reported to your office when determined at a later date. Due to the timely nature of this procedure, your early review of this matter would be greatly appreciated. Estimated Start: June 30, 1984 JUN 2 7 Alaska Oil & Gas Cur,~ c~mmission 14. I hereby certify that the fpregj;~ng is true Signed · , __ The space below for Commission use and correct to the best of my knowledge. Area Dri 11 ing Engineer Title Date Conditions of Approval, if any: Approved by Form 10-403 Rev. 7-1-80 · e, pproved Copy ~.Returned . By Order of CQMMISSIONER the Commission Subr~t ~ntel~tions" in Triplicate and "Subse~zf~nt Reports" in Duplicate june 15, 1984 ~. T. L, Fithian Area Drilling Em~ineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re: P~dhoe Bay Unit DS 15-17 ARCO Alaska, Inc. Pe~t No. 84-89 Sur. Loc. 736'F~, 141'~, Sec. 22, TllN, R14E, UM B~ole Loc. 1205'~, 1425'FWL, Sec. 15, TllN, R14E, UM Dear ~. Fithian: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log information shall be submitted on all. logs for cop.vinE except experimental logs, velocity surveys and dtpmeter surveys. }~any rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05.870 and the regulations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you. may be contacted by the Habitat Coordinator's Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article 7 and the re~lations promulgated thereunder (Title 18, Alaska A~nistrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to commencing operati_ons.you ma.y ~be~contact.e.d by a representative of the Department of Environmental ~onservatlon. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention 1~Ir. T. L. Fithlan Prudhoe Bay Unit DS 15,-17 -2- June 15, 1984 equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing b~fo~e drilling below the shoe of the conductor pipe. In the event of suspension or abandonment, please give this office adequate advance notification so that we may have a witness present. C. V. Chatter~on Chairman of Alaska Oil and Gas C~nservation Commission lc Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ARCO Alaska, Inc~'~ Post Office x 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 June 11, 1984 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-17, Permit to Drill Dear Mr. Chatterton: Enclosed is our application for Permit to Drill DS 15-17 and the required $100 filing fee. Attachments to the application include plats detailing the section and plan views of the proposed wellbore; a proximity plat showing the subject wellbore's position to the nearest well drilled; a sketch and description of the BOP equipment; and a sketch and description of the surface hole diverter system. Since we anticipate spudding this well on June 28, 1984, your earliest approval will be appreciated. If you have any questions, please call me at 263-4610. Sincerely~ T. L. Fithian Area Drilling Engineer TLF/JG:tw GRU7/L90 Enclosures ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany RECEIVED JUN 1 S 1984 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA b,L AND GAS CONSERVATION CO,,,MISSION PERMIT TO DRILL 20 AAC 25.005 lb. Type of well EXPLORATORY [] SERVICE [] ~3TRA~IGRA~I--] DEVELOPMENT OIL ~ SINGLE ZONEX~] DEVELOPMENT GAS [] MULTIPLE ZONE la. Type of work. DRILL [~X REDRILL [] DEEPEN [] 2. Name of operator ARCO Alaska, Inc. 3. Address P, 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 736' FNL, 141' FWL, Sec.22, TllN, R14E, UM At top of proposed producing interval 1320' FNL, 1320' FWL, Sec. 15, TllN, R14E, UM (~ Target) At total depth 1205' FNL, 1425' FWL, Sec.15, TllN, R14E, UM 5. ElevationRKB 71'in, feetpAD(indicate40, KB, DF etc.) 6. Lease designation and serial no. ADL 28306 ALK 2316 9. Unit or lease name Prudhoe Bay Unit 10. Well number 15-17 11. Field and pool Prudhoe Bay Field Prudhoe Bay 0il Pool 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500~000 13. Distance and direction from nearest town 7-1/2 mi. NW of Deadhorse miles 14. Distance to nearest property or lease line Jl 5. Distance to nearest drilling or completed 1205'FNL @ TD feet 15t16 well 120' ~ surface feet 17. Number of acres in lease /18. Approximate spud date 2560 / 06/28/84 16. Proposed depth (MD & TVD) 10801'MD, 8939' TVD 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 2600 feet. 21 feet MAXIMUM HOLE ANGLE 42 ° i20. Anticipated pressures (see 20 AAC 25.035 (c) (2) _~200 psig@__ Surface ./;012 psig@ 8939 ft. TD (TVD) Proposed Casing, Liner and Cementing Program SIZE Hole Casing Weight :30 20" 91,5# 17-1/2" 13-3/8" 72.0# 12-1/4"J 9-5/8" 47.0# ~-5/8" x 3-3/8" Ar '8-1/2" / 7" 29.0# 22. Describe proposed program: CASING AND LINER Grade I COuplingl Length H-40 I Weld I 80' L-B0 J BTC J 2470' L-B0 / BTC I 9967' erie Pac~ J L-80 / BTC / ~°s' SETTING DEPTH M D TOP TV D 30' I 30' I 30' 30' 29' I 29' I 9696' I 8125' , I MD BOTTOM TVD 110' I 110' 2500' I 2500' 9996' I 8346' 10801' ! 8939' I QUANTITY OF CEMENT (include stage data) 2000# Poleset 2300 sx CS 111+400sx CS I 500 sx Class "G" & 300 sx CS I 400 sx Class "G" ARCO Alaska, Inc., proposes to directionally drill this well to 10801'MD (8939'TVD) to produce from the Sadlerochit zone. Logs will be run across selected intervals. A 13-5/8", 5000 psi, RSRRA BOP stack will be installed and tested. The annular preventer will be tested to 3000 psi and rams tested to 5000 psi. The BOP equipment will be pressure tested each week and operationally tested each trip. A string of 4-1/2", 12.6#, L-80 tubing and packer will be run. Provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A Sundry Notice will be submitted when the well is to be perforated. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A surface diverter will be installed and operationally tested prior to spud. DS 15-17 will be 120' away from DS 15-16 at the surface. There are no other wellbores closer than 200' anywhere along the proposed well course. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x 13-3/8" annulus will be left with a non-freezing fluid during any interruption in the disposal process (i.e., rig move, shutdown of disposal process foran extended ~~i'me), . ,~j ~, ~/~~ SIGNED ~.Z' TITLE Area Drilling Engineer DATE ~ The space below for Commission use CONDITIONS OF APPROVAL Samples required Mud log required Permit number Approval date Directional Survey required APl number ~ES []NO 5O- OZq' SEE COVER LETTER FOR OTHER REQUIREMENTS ,t.u~v.~w,oo,u~ DATE T,.,.,~,~ I r., I ORA by order of the Commission Submit in triplicate 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 0 1000 2000 3000 4000 5000 6000 7000 ' I I I I I I I 1 I I I I I I I I I IIIIIIII IIIII''~ ' ' I ' t ' t , ~ , t , , t , , , , ~ ' ~ ~ ' ' ~ ' ~ * 0 20' CAS NG TVD--110 gl:lO0 AI.i[$KA, IN~. 8OALE 1 Ih. - 1000 FT. 13-3/e' CASINO TVO -- 2,500 KOP TVI) =ae0o ~- 141' ~ & 736' ~ of 2.5 Sec. 22, TI~, R14E, b~ 7.5 ~2.5 ~- 1320' ~ & 1320' ~L of 17.5 Sec. 15, TllN, R14B, 22.5 27.5 32.5 37.5i ) -- 0761 MD -- 71145 DEP -- 7000 ' -~ ~ 8ooo SAG RIVER TV[ --8283 MD -- O ~83 OEP -- 4378 SHUBLIK TVD - 8307 MD-~1948 DEP- 441e 9-1~/8' CASING TV[I - 8346 MD =9)88 DEP-4452 TOP ;;ADLEROCHIT T~D --8386 MD --'i0OO9 DEP -- 441 G/O CONTACT TVD-- 8868 ME --10430 DEP--, TAR~IET TVD = 8771 MD n1057E DEF n 4~_= ~ BASE SADLEROCHIT TVD - 886~1 MD - 10701 DiP - 4929 ~: ~ ~0--883~ M0--10801 D;P-4895 ~ 9000 ................................................................ lO000 ,ooo ooo ,ooo ooo sOOOREC [ ED ooo VERTICRL S~CTION 1000 2OOO 3000 4000 SO00 6000 JUN O_ W W W Alaska Oil & Gas Cons. Commission Anchorage DS15-17 E - ~ O00ROINB~ES -2000 -1000 0 1000 2000 3000 4000 5000 O~ i i ~ i i i i i ~ i i I i i i i ! i ~ ! i i ! i ! i i i i i i i i i i i i ! i i t i ! i I i i i i i i i i I I i i i i i i I i i SILL- 141' ~ _ , ~ t]~ Sec. 22, TltN, R14E,~ ~ ~~ ~- 1320'~'~ & 1320'~L of ' ~ ~4 ~~~ Sec.15, TllN, R14E, ~ ~ ~1~-17 ( , Target- ~- 10,572 ' DEP-4842~ tLt IV D ~ & 8as Commission ilaska Oil ~O~S. -2000 - 1000 0 1000 2000 3000 ~000 5000 E - N COORDINBT£S 0 0 0 LC) 0 0 DSI5-17 E - N COOROINFITES ,-300 -200 ,~00 0 100 ' '~'~ 200 300 400 O I I I I I I I I I I I I I I I I I I I I I I I I I I 15 ~ 15-16~ co 3831 // ' ,~_' 914 :658 0 / i~ 3289 " , . /'" ARC D ALASI~ A;_ INC. : - - .- t 8~; ALE 1 IN. ~ 1( ~ 'Fr. · !"~ L, ~,,~.. I V 1...'1~~ ' ' · -300 ;. · -200 - -100 0 100 200 300 't00 E - N COOROINFITES JUN l ~ 1984 Alaska 0ii & Gas Cons. Commission Anchora.oe 13-5/8" BOP STACK DIAGRAM · aNNULaR PREVENTOR PIPE RaMS BLIND aRMS SPOOL PIPE RaHS Accumulator Cap..acity Test 1. Check and fill accumulator reservoir to proper level with hydraulic fluid. 2. Assure that accunulator pressure is 5000 psi with lb00 psi downstream of the regulator. 5. Observe time, then close all units simultaneously and record the time and pressure remaining after all units are closed with charging pump off. 4. Record on IADC report. (The acceptable lower limit is 45 seconds closing time and 1200 psi remaining pressure. 13-5/8" BOP Stack Test 1. Fill BOP stack and m.~ifold with a non-freezing liquid. 2. Check that all hold down screws are fully retracted. Mark ming joint with predetermined plug se.a.ting depth. Run test plug on drill pipe and seat zn wellhead. Run in lock down screws. 3. Close annular preventer and upstream valves. 4. Functionally test chokes. -5. -In each of the following tests, first hold a 250 psi low pressure test for a minimum of 3 minutes, then test at the high pressure. 6. Increase pressure to 3000 psi and hold for a mimimum of 3 minutes. Bleed pressure to zero. 7. Open annular preventer and close top set of pipe rams. Increase pressure to $000 psi and hold for at least 3 minutes. Bleed pressure to zero. 8. Close valves directly upstream of chokes and open chokes.. Increase pressure to $000 psi and hold for at least 5 minutes. Bleed pressure to zero. 9. Open top set of pipe rams then close bottom set of pipe rams. Incre~e pressure to 5000 psi below the bottom set of pipe rams and held for at least 3 min- utes, Test reamining untested manifold valves (if any) with 5000 psi upstream of valve and zero pressure downstream. Bleed pressure to zero. Open bottom set of pipe r21~. Back off running joint and pull out of hole. Close blind rams and test to 5000 psi for at least 3 minntes. Bleed pressure off all equipment. Open blind rams. Make sure manifold and lines are full of non- freezing liquid and all valves are set in drilling position. 14. Test standpipe valves to 5000 psi. 15. Test Kelly cocks and inside BOP to $000 psi with Koomey pump. 16. Check operation of Degasser. 17. Record test information on blowout preventer test form. Sign and send to Drilling Supervisor. 18. Perform complete BOPS. test once a week and func- tionally operate BOPE daily. 10. 11. 12. i3. RECEIVED JUN 1 1984 Alaska Oil & Gas Cons. Commission Anchorage Revised 2/21/84 SURFACE HOLE DIVERTER SYSTEM ARCO ALASKA INC. SCHEMATZC ..,.....--'-- IO" HYD. OPR. BALL VALVE .,,,/' ~ V~LL BORE (SEE DETAIL) ./ ,,~ ..---'-" IO" HYD. OPR. BALL, VAL ,V,E /' //// I ALL 90* TURNS ARE 'TEE ~ ! CUSHION I RESERVE PIT AREA NOTE' FLOWL INE DR ILL ING RISER 20" 2000 PSI WP ANNULAR PREVENTOR 'Valves on diverter lines open automati- cally when the annular preventer is closed. -- DR ILL ING SPOOL 20" CONDUCTOR PIPE IO" HYDRAULIC OPERATED BALL VALVES "DETAIL" 20260102 AR CO Alaska/~"~:,/-'~ Post Ol,,ce ,-..x 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 17, 1984 Mrs. Elaine Johnson State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: Conductor As-Built Location Plat - DS 15 Wells 16-19 Dear Elaine. Enclosed is an as-built location plat for the subject wells. If you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG' tw GRU7/L57 Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany RECEIVED ; AY 2 A!aska 0il & Gas Cons. Commission Anchorage /6 141'----- 165'~ /5 _ Gyro '~"'15° 00' od' CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT ! AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE O~ ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE BY ME OR UNDER MY SUPERVISION AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. A Y " '-' - w,,,, ,,, ,,, ,,,, ,, ASBUILT WELL LOCATIONS WELL No. 16 Lot. 70° 17',52.919". Loag. 148°;54 26.072 EL. 32.80 · 5, 960, 630.76 676, 088.19 WELL No. 17 EL. 32.35 Lat. 70° IT' 54.078" Y 5, 960, 748.01 Long. 148054'26.782" X 676,061.11 WELL No 18 _ EL. 32.60 · _ Lot. TOO 17 ~.5.255:'_,' Y 5,960,865.04 . Long. 148°3,4 27.495 X 676, WELL No. 19 EL. 32.50 Lot. 70° 17' 56.389" Y 5,960,981.75 Long. 148°3,4'28.196" X 676,007.10 o. GYRO ASBUI LT Lot. 70° 17' 42.940" Y 5,959,620.3 .. Long. 148°:54'21.186" X 676,279.6 NOTES .I. Elevations are ARCO datum M.L.L.W. Z. Ail distances are grid. 3,. X,Y coordinates ore Alaska State Plane Zone 4. RECEIVED Alaska Oil & Gas Cons. Colllmissiorl Anchorage LHD 6'~'-~SSOCIATES J ~. ~~o., ARCO Alaska, Inc. ASBUILT DRILL SITE No. 15 WELLS 16, 17, 18, 19 LOCATED IN PROTRACTED SECTION 22, T II N, R 14 E, U.M. DATE: 4-25-84 I$CALE: I"= 300' CHECK LIST FOR NEW WELL PERMITS IT EM APPROVE DATE Company .~~ ~/~f<~P ~%C. Lease& Well No. YES NO REMARKS (2 thru 8) (8) (3) Admin ~O~_ ~ (9 thru 11) (10 and 11) (12 thru 20) (21 thru 24) (6) .Add: 1. Is the permit fee attached .......................................... ~ 2. Is well to be.located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4· Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is well bore plat included ............... 7. Is operator the only affected party ................................. 8. Can permit be approved before ten-day wait ......................... e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Does operator have a bond in force .................................. .A~ Is a conservation order needed ...................................... Is administrative apprOval needed ................................... Is conductor string provided ........................................ ~_~_~- Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones ....................... ~ Will all casing give adequate safety in collapse, tension and burst.. ~ Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed ........................... H~ Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ..... · ~ Does BOPE have sufficient pressure rating - Test to ~f~-D psig Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements ............................................. Additional Remarks: 0 ~ o mm Geology: En giJ~e~e ring: LCS WVA~ JKT~HJH rev: 12/08/83 6.CKLT INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No special 'effort has been made to chronologically organize this category of information. .o * AbASKA COMPUTING CENTER * , · ****************************** * ....... SCHLOMBERGE~ ****************************** CO~,{PA~qY ~'~}A,~,~f: : ARCO ALASKA, iNC. F'IELD ~A~E : PRUDH[)~ BAY BOROUGH : NORTH SLOPE STATE : ALASKA API ~tU~,~BER : 50-029-2l 126-00 [~EFEPE~4C~; {q{~ : 95155 RECEIVED MAY 0 4 1995 Alaska 011 & ~as Cons. Commisslon Anchorage IS Tape Vet!fl, cation Listing ~hlUmherger Al. asKs Computinq Center 2-'MAY-1995 16:30 DATF? : 95105/ 2 ORIGIN : FLIC RFEI, !~!AME : o5155 C~NT!NbATION ~ : PgEVIOUS RREb CO~E.{>,~T : ARCO ALASKA linC., PRUU~O~ 'RAY, D.S. 15-17, ,API~ 50-029-211~6-00 SERVICE NAi~:E : EDIT DAT~i : 95/05/ 2 O~I~IN : Fb!C T~APE NA~E : 95155 CONTIN[.~ATIO~ ~ : ~ PgEVIOUS TAPE : CO~ENT : ARCO ALASKn INC., PRUDHOE B~Y, D.S. ~5-17, API~ 50-029-2~196-00 TAP~ API NUMBEP: LOGGING COMPA~Y: TAP~ C~EATION DATE: dOB NUF!B~.;R: OPEPATOR WITNESS: SURFACE LOC~TIO~3 SECTION: FSL: FWL: ~ELLY DF. RR ICK FDO[;R: CROU~.;D LEVEL WELT~ CASI~.~G R~iCORD 1ST STRING 2ND STR!~G ~RD STRIWG PROt'UCT!O~q STRI~fi D,S, 15-17 500292112600 ARCO ALASKA, INC SCHLUMBERGER WEL~ SERVICES 2'MAY'95 95155 BAI~E~ ~.~EYNOLDS 22 I1N 14E 716 141 71.00 70.00 40.00 OPg~; !!OLg CAS!i~G DRII,LF:RS CASING 5IT SIZE (t~!) SIZE (IN) DEPTH(FT)WEIGHT (LB/FT) .............. ..... ......... 7.000 0639.0 29. 7.000 10834,0 27,00 4,500 9520.0 12.60 CURVE SHIFT DATA - AI,I~ PASSKS To STA?.;DARD(~,!KASURED DEPTFI) PAGE: IS ~ra~e Verlftcatlon ghltlr~, erger A. lasK~ CO~PUtiH CeDter DD~G ~OOL C DE: LDWG CURVE CODE: RIt~ P~U~BER: DATE LOGGgO: LOGGIMG CO~PA~Y~ BASELINE D~PTH 10667,5 ]0647,5 10640.5 10635,5 10634,0 1.0627,5 !0~20.5 10610'5 10563 5 10559]5 10559 0 10543 5 os4 :o 1O535.5 !0527'0 lo5Ie.5 ~o515.5 ~o5o7.5 !o5o6.o lo~91.5 ~ 0490 5 1 (3456, ~ 10451.5 ! O45O 5 1041 ~. 5 1O415,5 ! o4o8. o I 0407.5 !039~.0 ~0375.5 ~0357,5 !034a.5 1033!,5 !03~7.0 10307°5 1~304.5 !0767.5 1O255,5 10727.5 2-~AY-!995 i6:30 G~CH C~:~TG 8 . .0 8888~ 0 ] 0667,5 1064:8.0 1 O642.5 t 0635.5 10635.5 0627,0 1. 0620.5 10610,5 1U563.0 10558,5 I 055~.0 10550,0 10541.0 I05~0.0 10532.5 10524.5 10517.0 0513.5 O5O6.5 1O505.5 ~ 0490.0 10.48~,5 1 O469,5 I Oa, ba. 5 1 (3449,0 ~ t)432.5 !0415,5 ~0413.5 ]0406,0 ~ 0397,5 tO396,5 ~0~74.0 10330,5 10316,0 1 o 303,0 10286.5 10255.0 ~.0227,5 PAGE: IS Tape VerIficat~on chlu~berger !0199,5 10184.0 ! 0 i. 75.5 1017!,5 1012g,0 101~5,5 ~O!~,O ~0107,5 ~0~03,5 ~0099,5 ]0098,0 ~0087.5 10076,5 10063,5 ~0047,5 ]004].0 10031,5 1¢)027 0 99s'o 9983°5 9971,5 9964,0 9963,5 9959,5 9951,5 9939,5 9029,0 9926,0 9919,5 99i4,0 9907,5 9905,0 9895,5 9@~,0 9871,5 9867,0 983],5 9827,5 9P22,0 lO0.O Computing Ce~tar 10104,0 10098,5 !.0076,5 i0042,0 10027,5 9995,5 9065,5 9929,5 9927,0 991.5.0 99(}5,5 9~0,5 9867.0 9~32,0 I 0200, 0 10176,5 I0!.72,0 101..19.5 10115,0 t0107,5 J. O104.0 10099,5 10087.0 10063,5 1,,004@,0 !.0031,5 9984.0 9072,5 9964,0 9960'5 9952i0 9939 5 9920,0 9907,5 9~95,0 9871,5 9827.0 99,5 2-~AY-!995 16:30 INFOR.~.IATiO{~ pER~Pt~Iiqi~G TO THE OPE,',~ HOLE bOG SUCH AS DATE LOGGING COiqPANY PASS NUaRER AND RUN ~'~,8 X'~T oRC~V!DRO ~.I1H ~'~E TAPE SUPPLIED BY THE OEPq'~ COR~ECT!(]~,~ SHO~N ABOVE REFLECT CASED HOLE GR HQLE GR AND CASE!) hOLE ENPH TO OPEN HOLE GR. ,- .U~VES ~'~RE CARRIED WITH THE ENpH SHIFTS ' PAGE: IS Tace Verification Listinq rblumberger AlasKa Computino Center SERVICE : Fb!C DATE : 95/05/ 2 MAX REC 8~ZE : 1024 L~ST VI LE 2-~AY-1995 16:30 PAGE: F!LF F!LS~ ~'U~BER: EDITEP CORTES Depth sh~fted a~d cliPPed ct~rves ior each ~ass in separate files, DEPT~,~ I ;,~CR EN E~,~'l~: 0.5000 FILE SU~4ARY LOWG TOOL CODE START DEPTN STOP OEPTH G H 979 C~'~TG 10676.0 9796.0 CURVE SIqlFT DATh - PASS TO PASS(~'~EAStJ~ED DEPTH) gASELIt, iE C~RVE FOR SHIFTS .......... [gUIVALEf~'~T [J~ISHIFTE!) DEPTH ..... ----- P~;~.hRKS: This file contains Ct'~TG pass ~1. No pass to pass Shifts were a~,r31ied to tnJ..s data. LIS ~'OR~'~AT DATA ** m~TA FO~T SPFCIFICATIOk mECORD ** ** SET TYPE - 64E~ ** 1 66 0 2 60 o 3 73 66 4 66 I IS Ta~e Verl[Icatlon Listinq lumberger Alaska Computina Center !995 ~6:30 5 66 6 73 7 65 8 68 0,5 9 65 FT 13 66 0 14 65 FT 15 66 68 16 66 0 66 0 D NPHI CNTG PU-S 500995 O0 CPH.I:. CNTG PU-S 500995 O0 ENPt! CNTG PU-$ 500995 O0 NRAT CNTG 500995 O0 CPA~ ChTG 500995 O0 EN~A CN'TG 5,)09~5 O0 NCNT CNTG CPS 500995 O0 FCNT CNT~ CPS 500995 O0 CNTC CNTG CPS 500995 O0 CFTC CNTG CPS 500995 O0 CNEC CNTG CPS 500995 00 CFgC CNTG CPS 500995 O0 GPCN C(,.~TC GAPI 50o9~5 TENS C5~TG bB 500995 O0 CCL CNTG V 500995 O0 G~ BCS GAPI 500995 00 000 000 0 O0 0 O0 000 000 000 00 n 000 000 0 O0 noo o o o o~o, 0 O0 AP1 APl FI NOMB CLA,SS NOD NUMB SAMP E 0 0 I 1 O0 0 I 1 1 O0 0 I 1 1 O0 0 I 1 1 00 0 1 I 1 0 o 0 1 1 1 On 0 i 1 O0 0 I 1 O0 0 1 I 1 00 0 1 1 1 00 0 1 1 1 00 0 1 ! O0 0 1 1 1 O0 0 1 1. O0 0 I I 1 O0 0 1 1 l O0 O i 1, 1 hEN CODE (HEX) ''''''''''''''''''''''''''''0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm - - .q99 25O DwPT 10605 {)00 ~.!PHi CNTG O~'q, 250 CPHi CNTC NPA. T.CNT~ -999.250 CR ~,~r. CNI'G -999.250 ~NRA.CNTG '999'250 , " . G -999.250 CFTC.CNTG 999.250 FCN!': CNTG -9o9.25U C,,TC C~iT - CF~]C,CI',~TG -9q9.25_, OaC~.C~,,:~g 999 250 TENS C TG 999.250 G~.BCS 4~.7~9 ENPH.CNTG NCNT.CNTG CNEC.CNTG CCL.CNTG DEPT. 9795 r;).~ · .,,(u UPI't I. C~'~':[G 26.186 CPHI CNTG 2~.366 ENPH.CNTG NPAT. C~,,~?G .].ua9 CR~-T.CNTG 2.839 ENRA.C~TTG 3,725 NCNT.CNTG FCNT.COTG 956.1~0 Ci-~TC. C~, TG ~694.]54 CFTC.CNTG 983.189 CNEC.C~TG CFEC ChTG 1113 659 GRCH CN'.,~., -990.~50 TENS C?,iTG 2320.000 CCt,.CNTG G~, 8C5 -9o9. 250 Z999.250 999,250 .-999.250 999.250 21.489 2878.242 4148.297 -0.032 IS Tape Verification 5istino ~hlumberger Alaska Computin~ Center 2-~AY-1995 16:30 PAGE: ** gK!D OF !)ATA *~ **** Fibs TRA I!.,EP **** VERSION : 00.I. CO 1 DATE : 95/05/ 2 ~AX RE:C SIZE FILF TYPE LhST FILE **** FILE HEADF, R **** F!bF HA)~C : EOIT ,002 SMRVlCE : FLIC VFRSIO~>! : 001. C01 DATE : 95/05/ 2 FILF TYPE : LO b~$~ Flbg : FILE HEADER FILF NUWBER: 2 EDITED CURVES Depth shifted and cli. poed curves for each pass in separate files, 0.5000 FILF StIBHARY S START DEPTH 10676,0 STOP DEPTH 979g,0 9799,0 # CURVE SHIFT DATA - PASS TO PASS(~.;EASljRED DEPTH) ~ASF, I,IME CURVH2 ~OR SHIFTS LD~G CLIPV~ CODE: ~RCH PASS ~U~FR: ! ~0~66,0 10647,5 t06~3,0 .......... K~U!VALENT U~!SHIFTED DEPTH .......... GRC~ C;~TG 1. U665.0 10~4~. 5 10642.0 IS 7'a.~e Yer!.ficatton Listin{~ :blU~berger AlasKa Computi.~g Center 2-~AY-1995 16130 L~S ~061!.5 10597,5 !0559,5 1. 0533,0 1 0490.5 10486.5 10481' 0 ! O450.5 ~ O4O ~. 0 10400.0 ~0~9~.5 ~0397,0 ~0391.5 ~ 0357 , 5 ~0354,5 ~03 ~ 0221 5 10~87 0 10131 0 ~ 01.25 5 lC!!4 5 10~ 11 5 10111 0 1 0098 0 9998,5 9995.5 995],5 9930,0 992q,5 9895,5 98~4.5 9P~8.0 G~66,5 9~31.5 982q,5 9801.0 100.0 106!a,5 ]0559.5 I048~,5 10407,0 10396,5 !038g.5 10356.0 10316.0 10310'5 10221,5 101S8,0 10131,0 !0!26.0 10!14.0 10111.0 10098.0 999g.0 9952.0 9~B4.5 9R67.0 9~32.0 9822.0 100.0 10590,0 1O56O.5 10530,5 loaso,o 10449.0 1039~.0 10353.0 ! 0128.5 ~01.11,0 9995.5 9929.5 9895,5 9~29.5 100.0 PE~ARKS: This file contains CNTG pass shown above relect GRCH Pass g~,iP~ Pass ~2 to E~PH Pass ~1. FGR~AT ~ATA ~2. The depth ~2 to GRCH pass shifts #1 add cblumberger A,!8$ka ComPutin~ Center 2-~AY-1995 16:30 ** DATA FOR~IAT SPECIFI[CA..TION REC['¢RD ** ! 66 0 2 66 0 3 73 64 4 66 5 66 6 73 7 65 ~ 68 0,5 9 65 FT 11 66 16 I~ 68 14 65 FT 15 66 68 16 66 0 66 ** SET TYPE - CHAN NAM~ SERV 'UNIT SERVICE APi APT APl APl FISE NUMB NUMB SIZE REPR PROCESS ID O~,DE~ # LOG TYPE ~,bASo MOD NL1NB SAHP EbEM COJE (HEX) I)EP._' FT 5(;0995 O0 ()00 O0 O ~ 1 1 4 68 0000000000 NPHT CNTG PU-8 5009c~5 OO O00 O0 0 2 1 1 4 68 0000000000 CPHI CI~,!TG P!J-$ 500995 O0 000 O0 0 2 1 I 4 68 0000000000 ENP~ CNTG Pt,!-$ 500995 O0 000 Oo 0 2 1 1 4 68 0000000000 NRAW CN'rG 500995 Ou 000 Og 0 2 1 I 4 68 0000000000 C ~' A.q' CNTG 5U0995 0,) 000 O0 0 2 ! i 4 68 0000000000 E~Rh CbJTG 500995 OO ()mO O0 o 2 1 I 4 68 0000000000 NCHT C ~%~ 5' G CPS 500995 OO 9Or) O0 0 2 1 1 4 68 0000000000 FC ;,~ ? CNTG CPS 50n9~5 Og 000 oO 0 2 1 1 4 68 0000000000 C~TC C~T(; CPS 50c~995 O0 000 O0 0 2 i I 4 68 0000000000 CFTC C i',~, T G CPS 5(~0995 oU 00() O0 ¢? 2 1 1 4 68 0000000000 C ~ EC CNTG CPS ~L~0905 0(~ ()Or> CO 0 2 1 I 4 68 0000000000 C~EC CNTG CPS 5L',0995 O0 C, OO O0 0 2- 1 1 4 68 gO00000000 G~C~4 CN'.rG GAP! 500995 OO OOO O0 0 2 l I 4 68 0000000000 T~NS CNTG DB 56-09~5 O0 ('~00 O0 0 2 1 1 4 68 0000000000 CC!., C~'~TG V 5C0995 O0 OeO O0 0 2 1 1 4 68 0000000000 mm~mmmmmmmmm~m~mmmmmm~mm~mmmm~mmmmmmmmm~m~mm~mmmm#mmmmmmmmmmmmmm~m~mmmmmm~mmm# PAGE D~PT. lOO75.t~nt) ,~PH I t" !~'~ T G 20,376 CPPI.CNTG FCNT. C?~'rG 1. o24.76~ Ce~'C. CNTG 2536.!57 CFTC.CNTG CFEC,C?~TG !031.274 GRCH.C?~TG -999.250 TENS.CNrG 17.236 ENPH.CNTG 3.406 NCNT.CNTG 1068.210 CNEC.CNTG 2530.000 CCL.CNTG 18.819 26!2,225 3512,146 -0.020 [S Ta~e ~:ertiicatioD !,istin~ :blUmberqer AlasKa Computinq Center 2-MAY-1995 16:30 PAGE: D~PT. 0799.000 NPNI.C~)TG NPAT.CNTG 2,393 CRAT.CNTG FCN~,CN~G }~97'90~ CNTC,CN~G CFEC.CNTG 2100.341 GRCM.CNTG 17.!74 C~I,CNT~ I5.146 2.294 ENRA,CNTG 2,505 3432.085 CFTC,CNTG ~546.593 ~2.938 TE~S,CMTG 2185.000 ENPH CNTG NC~T:CNTG CNEC.CNTG CCL.CNTG I1,804 3524.024 526i'527 0.027 **** FILE FILE NA~E : EDIT ,002 SERVICE : FLIC VERSION : DATE : 95/05/ 2 NAX R~C SIZE : F~bF TYPE : **** FILE }~!EADER **** FILE ~h~g : EDIT ,003 SERVICE : Fl..lC VERSIO~i : oOICOI DATE : 95/05/ 2 M~X REC SIZE : ~024 F]bE TYPE : LO L~ST FIL~ : FILE ~O~bE~: 3 Depth shifted arid clipoed curves for each pass in separate files, 0.5000 PASS NUUB~R: DEPT~; INC~EUENT: FILE SUV~!A~Y !,[)~G TOOL CODE ........ C~TG START DEPTH lO676.0 980o.0 CURV~:; SM1FT DATA - PASS TO PASS(t',;iEASUREL') PbJPTH) FASELI~!E C[)RVE FO~ SNIFTS LD?;~ CURVE COD~;: G~Ch PASS ~LJ~b~:R: 1 .......... FO[~IvALENI [~NSN[FTEQ DEPTH .......... ~% A S E!.., I' ~,~ E OLPTH GF:CH C ~',; TG IS Tape Verification Listir, q :hlu~beroer Alaska Computing Center 10666,0 ~ 0660,5 106~I, 5 10648,5 1. 0649,0 1 i)626,0 I 0626,0 1062 ~, 5 10617,5 ~ 0616 , 5 ~0612,0 ~0610,5 ~0561,5 ~. 0559,5 !055<~,0 ~ 0543,0 1054!, 0 10541,5 I0533,o 0527.5 ! 0527,0 ~0490,5 I 0450, ~ 04.46 , 0 i 0423,~ ~ ()42~. 0 10420,5 ~ 04~2.0 ~040~.5 ! 040~, 0 ~ 0407.0 10398,5 10396.5 ~ 0397.0 ~ 035~, 0 10356. 1034~,5 10318,0 ~ 0~73.0 10270,5 10~65,0 10~63,5 10~44,0 1.0~22,5 ~0221.5 1018a.0 10177.5 10177.0 10~4~.5 lt~l. ~. 5 1012e,5 1609a.5 10098.5 10079.0 10678.5 1 0078.5 10056.0 10055.5 10044.o 1 004! ,5 9997,0 9997,0 9~95.0 99~6,0 9951 .5 9n52.5 902° 9929,0 88887.0 ~0665'0 ~ 0642,0 ! 06 t 6,0 0,0 ! 0560,5 10539°0 1.0530,5 1. ~.~50 f ,0 t. 0489,5 104~2,0 1.0449,0 ! 0444,0 10418,5 10410,0 104o7,0 10394,5 10347,0 1031, 6,0 10242,5 lOJ.~4,0 lC~077.5 10043.5 992Q,5 2-~AY-1995 16:30 10 IS 'rape Yerif~cati. on bistir, q :hlt.lmberger AlasKa Comp!..)tinr¢ Center 2-P. AY-1995 16:30 9905 5 9905,5 9901: 0 9900,5 989~, 0 9898.0 9892'o 9~9~,. 0 9860,5 9880,0 9~71,0 9870,5 9667,5 9867,0 9839,5 9~38,5 9830,5 9829,5 9830,0 9~30,0 9~O~,5 9808.0 9801,5 9800,5 ].00,0 99,5 99,0 PE:~AR~S: ':]'his file contains CNTG [)ass ~3, The'depth shifts shown above relec~ GRCH pass ~3 to GRCH pass-#1 and E~P~,,1 pass #~ to ENPH pass ~1. $ ~IS FORMAT DATA PAGE~ 11 ** DATA FORgAT SPECIFICATION ~ECOPD ** ** SET TYPE - 64P];B ** T PE .. P CODE hUE t 66 0 2 66 0 3 73 64 4 66 5 60 6 73 7 65 93 66 O,5 9 65 FT 11 66 !2 68 13 66 14 65 FT !5 6~ 6~ !6 66 o 66 1 I$ Tame Veriflcation Listing chlumberger AlasKa Computing Center 16:30 PA~E~ ** SET NAMF RV !Jf~.!lT SER F fi NUMB UMB SIZE EPR PROCESS ID ORDE~ ~ LOG TYPE CLASS N{OD NU~B SAMP ELEM CODE (HEX) D~PT FT 500995 00 000 OO 0 3 1 1 4 68 NPHI CNTG PU-S 500995 O0 O00 O0 0 3 1 i 4 68 CPHI CNTG PU-S 500995 O0 000 O0 0 3 1 1 4 68 ENPU CNTG PU-S 500995 O0 000 O0 9 3 I I 4 68 NRAT CNTG 500995 OU 00O Ob 0 3 1 i 4 68 C~AT CNTG 500995 0O 000 OO 0 3 ! ! 4 68 ENR~ C~TG 500995 O0 000 00 0 3 1 I 4 68 NCNT CNTG CPS 500995 00 000 O0 0 3 ! 1 4 68 FCNT CNTG CPS 500995 O0 000 O0 0 3 I 1 4 68 CNTC CNTG CPS 500995 O0 000 O0 O 3 I I 4 68 CFTC CNTG CPS 500995 00 000 O0 0 3 1 I 4 68 CNEC C~TG CPS 500995 00 000 00 0 3 1 i 4 68 CFEC CNTG CPS 500995 O0 000 00 0 3 1 ! 4 68 G~C~ CNTG GAP! 500995 oO 000 O0 0 3 1 1 4 68 ~ENS C~TG bB 500995 O0 000 O0 0 3 1 1 4 68 CCh CNTG V 500995 OO 000 O0 0 3 I I 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 12 DATA DEPt. 10675.(~00 ~P~ I. (7: ~T ,G 20.0q5 CPMI,C~ITG 18.15! ENPH.CNTG N~ ,CNTG 2.630 CRAT.L. TC 2.486 ENRA'C:NTG 3'691 NCNT,CNTG FCNT,CNTG 1097 983 CaTC , ' . , C~.}TG 2693.425 CFTC CNTG 1103,397 CNEC,CNTG ** [<NO Ci~ PATA 21',199 2891,924 3535.349 '0.020 **** FIL~ TRAILER **** FIL~ N~,E : EDT]' .003 S~RV1CE : FLIC V~RSIOi~ : 00lC01 DATW : 95/05/ 2 ~X REC SIZF : 1024 FILF TYPE : 1,0 **** FIL~ HEnD~ FIL~ ~A~ : E~T!' ,004 SFRVICE : FLIC VERSIOa : 001C01 D~TF : 05/05/ 2 ~X ~EC S~Z~ : 1024 FlbW T~P~ : L~$T ~I[,E : IS Tape Verification blstlr)o ~hlumber~er AlasKa ComputinO Center PAGE: !3 FILE FILE NURSER{ Compensated ~eutron: Ariti~metic average of edited passes for all curves. Pulse6 ~eutron: Unaveraged edite~ Pass 1Ga~ma Ray and backrouDd counts; arithmetic average of edited stat{c baseline passes ~or all. ot~er curves. DEPTH I~CRE~ENT 0.5000 PASSES INCLUDFD IN AVERAG~ I,DWG TO0~ CODE PASS $ P~ARKS: The arithmetic average of passes i,2 & 3 wascomputed after all depth shifts and cllPDi.~ was applied. $ LIS FORMAT DATA ** DATA F~R~AT SPECIFICATION ~ECORD ** ~* SET TYPE - TY'P~ REPR COi).~ VAI,,I,JE 1 66 0 2 66 0 ] 73 56 5 66 ~ 7] 7 65 8 68 0,5 9 65 1~ 66 12 68 13 66 0 14 65 FT 15 66 6~ 16 66 1 0 6~ ** SET TYPE - C~AN ** ............. mmmmmm~mmMmmmmmmmmmmmmmmmmmmm~mmmmmmmmmmmmmmmmmmmmmm~mmmm~mmmmmmmmmmmmmm~mmmmmmmmmmmmm DEPT FT ~00~95 O0 000 O0 0 4 I 1 4 68 0000000000 hPHT CNAV PU-S 500995 00 000 O0 0 4 I ! 4 6~ 0000000000 CPM? C{~Av ~U-S 500995 O0 O00 O0 0 4 I I 4 ~8 0000000000 ENPI; C~AV PI~-S 500995 O0 000 ~0 0 4 1 ! 4 68 0000000000 IS Tape Verification Listino~ chlumberger A!aska ComputlnQ CeDter 2-MAY-1995 16:30 PAGE: 4 · . UNIT S ~CEi ,APi . API A. I ILE NO NUmB SIZE REPR PROCESS !g ORDER ~ LOG TYPE Ci,.A~S ~(JB NU,~B SA~4P gSE~ CODE (HEX) NRAT CNAV 5009q5 00 000 00 0 4 I ! 4 68 CRAW CNAV 500995 O0 000 00 0 4 1 1 4 68 ENR~ CNAV 590995 O0 O00 O0 0 4- 1 1, 4 68 NCNT CNAV CPS 590995 00 00O O0 0 4 I 1 4 68 FCNT CNAV CPS 500995 0O 000 0O 0 4 1 I 4 68 CNTC CNAV CPS 500995 00 000 00 0 4 1 I 4 68 CFTC CN~V CPS 5009~5 00 000 O0 0 4 1 ! 4 68 CNEC CNAV CPS 590995 00 000 o0 0 4 ! t 4 68 G~C~ CNTG GAPI 500995 O0 000 00 0 4 1 i 4 68 0000000000 0000000000 0000000000 0000000000 00000000OO 0000000000 0000000000 0000000000 0000000000 0000000000 ** t)ATA DEPT 10675 0~0 ~PHI CNA,/ 20 377 CPHI.CNAV 18.226 ENPH CNAV NRAT.CNAV 2.5~7 CRAT.CNAV 2.508 ENRA.CNAV 3.46~ NCNT.CNAV FC.NT C~'~AV 1040 135 C~'TC CN'AV 2585 990 CFTC.C~'~AV 1057.814 CNEC.CNAV . ~ . ~ . ~.,. ~ · · . ,., ~ · ~ ~ ~ ' ~ ~ CFEC CNAV 102~ ~62 G, C,H C~'~'I'G 999 ~50 DEPT. 9796.000 NPHI.CNAV -999.250 CPHI.CNAV NDAT.C~AV -999.250 CRAT.CNAV -999.~50 E~IRA.CMAV FCNT.C~AV -999.250 C~TC.CNAV -999.250 CFTC.CNAV CFEC.CI~A¥ -999.250 GRCH.CNTG 36.4~9 -999 250 ENPM.CNAV -999~250 NCNT.CNAV -999.250 CNEC.CNAV 19,305 2758,68~ 3539,378 99 250 999 250 **** Flbg TRAILER FILE NA~E : BOlT .004 SERVICE : FLIC VERSION : DAT~ : q5105/ 2 ~AX REC SIZE : FIL~ TYPE : LO b~SW ~ILE : **** FTLM HEADEk FTbF NA~C : EDT7 ,005 VERSI~' 0~ ~aX ~FC SIZ~ : 1024 FTLw TYPE : LO LaS~ ~il, E : IS Tape Verification l, ist.!nq .-hlumberger AlasKa Computinq Center 2-~{AY-1995 !6:30 PAGE: I5 FILE SENDER F!L~ ~l.~6gR 5 RAW CURVES Curves a~ lou header data for each pass in separate iiies; raw bac~qround pass in last f~!e FIL~ SU ~ARY VENDOR TOOL CODE START DEPTH CNTG ~0676 0,. hG B~A, DE~ DATA 9796°0 DATE LOGGED: SOFTWARE VERSION: T!~E LOGGER ON TD D~I[,L~R T!) LOGGER(FT): TOP LOG INTERVAl, (MT): BOTTOiq LOG I~]TERVA5 LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): Ti}Ob STRING (TOP i'0 BUTTOi~) VE~DOR TO[~L CDDE R'OOL TYPE .......... . ..... ......... CCL CASIaG COt,L~.R LOG TCC TELEmeTRY CARTRIDGE $ DRILLERS CASING DEPTi'{ ~T): LOGGERS C~SIsG DEPTH 9¢"iqEaOl, E COi'~ P I T £ O~'~'S FLbID TYPE: FLUID DE~'~S I'r¥ SI} F'.FACE TE~4PERATURE BOTTUU HOLE TE~4PERATUR~ FLUID SAb~! TY FLUID LEVEL FI,UID RATE AT ~qATFR CUTS (PCT) GAS/OIL RATIO C},iO~E (DEC): 05-APR-95 42 2 {9~3 05-APR-95 10693,0 10680,0 9800,0 10677,0 NO TOOL ~'JU~BER SGC-8~-593 CAL-YA-2@ TCC-B-839 9~35.e CRUDE B [', T H 2.65 IS Ta~e Veri. f!catlon Listin¢~ ;blumberger AlasKa ComputlDq Center 2-~AY-1995 1,6 BLU[.:LINE COUi'{T ~ATE ~'~.iORMALiZATION i~: OiL ZONE TOP NOP~ihLIZ[~G wI'N[)O~':~ (FT): BASE] NORMALIZING wINDL,~W (FT): ~LUELT.,NE COU~N? RAT~.~ SCALES SST BY P'!EbD E~,!GiNEER FAR COUN~ RATE bO~, SCALE (CPS): 0 F~ COU~T ~'ATE HIG~' SCA'bE (CPS): 3300 NE,AR COUNT ~ATE LOw SCALE (CPS): 0 NEaR CObNT RATE ~.'.~IGH SCALE (CPS): 9000 TOOb STANDOFF (IN): REMARKS: TBE PRti~ARY P!~RPOSE OF T~!S LOG WAS TI] FIND THE GAS/OIL CO 287 BBLS OF CRUDE ~AS PUt, PAD PRIOR TO LOGGING, 8UT THERE wAS WGT ENOUG~ CRUDE ON LOCATION TO PUMP WHILE L GAS MIGRATED BACg< INTO ThE WELLBO~E DURING LOGGING. AFTER PUMPING, WHP:O PSI AFTKR LOGGING, WHP:: 410 PSI. ESTIMATED GOC=1060~'. LIS FO~AT DATA DATA FORMAT SPECIFICATION R~]CORD ** ** SET TYPE - b4EB ** · 3 73 70 5 66 6 73 7 65 8 6~ 0,5 9 65 FT 17 68 1] 66 0 1.4 65 FT 15 66 16 6~ 0 66 1 im~m~m~mm~mImmmmmmmm~mm~mmmm~! IS Tare Yeti fi, cation Listinq :hlumberget AlasKa ComputJ, nO Center 2-~AY-1995 16:30 PAGE: DEPT E~P~ TNRA P$~ E~R~ CFEC PS1 CNEC ~CE~ RCFT C~TO PSt CFTC PS! GR T~$ PS1 CCL RV b~,~ I T $ F T 5 O P U 5 0 P,,; 5 PU 5 O 5~ 50 50 CPS 50 CPS 5O ...... .... -;:;: .-----------------... ........ j "'~ ~t , .... DER ~ LOt:, ,,YPE CLASS ~(':)P NUM~ SAMP Kl,,~Ebt CODE (HEX) 0995 O0 00() O0 0 5 1 1 4 68 0000000000 0905 O0 000 O0 0 5 1 1 4 68 0000000000 0995 O0 O00 O0 0 5 i I 4 68 0000000000 0995 00 000 00 0 5 1 1. 4 68 0000000000 0995 O0 000 00 0 5 1 I 4 68 0000000000 0995 0O 000 00 0 5 ! 1 4 68 0000000000 0995 O0 000 0O f) 5 ! ! 4 68 0000000000 0995 00 000 00 0 5 I 1 4 68 0000000000 0995 00 000 00 0 5 I 1 4 68 0000000000 CPS 500995 00 000 00 0 5 ! 1 4 68 0000000000 CPS 500995 00 000 OO 0 5 1 1 4 68 0000000000 CPS 500995 00 000 00 0 5 1 I 4 68 0000000000 CPS 500995 O0 000 00 0 5 1 1 4 68 0000000000 CPS 500995 O0 000 O0 0 5 1 1 4 68 0000000000 CPS 500995 00 000 O0 0 5 I I 4 68 0000000000 PU 500995 O0 000 O0 0 5 1 I 4 68 0000000000 GAPI 500995 00 000 00 0 5 l I 4 68 0000000000 ,b~ 500995 00 000 O0 0 5 ~, 1 4 68 0000000000 V 5(30995 00 000 O0 0 5 ! 1 4 68 0000000000 ~mmmmmmmmmmmmmmmmm~m~mm~m~mmmmmmmmm~mmmm~#mmm~mmmmm~mmmm~mmmm#m~mmm~m~m~m# DEPT. T~RA.PS! C~;EC.PS1 RCFT.PS~ GP,PS~ DEPT. TNRA.PS~ C~iEC.PSI RCFT,PS1 107~8.000 ?,{PHI. PS1 22.121 TNPiIoP$1 19.895 EMPH.PSl ~..616 RTNR.PS1 2 729 ENRA,P$1 422 CFEC,PSI 3: 3630.906 ;~CEF. PS 1 1039,522 RCEN,PS1 325J, 771 RCNT.PS1 974.8~5 C{,:~TC. PS 1 2557,002 CFTC,PS1 996 298 NPOR,PS~ 42.2~1 TENS.PSt 1510.000 CCh. PSI -0:02!. 9703.50(} NPNI.PS! 23.208 ?NPH.P$1 21 516 E~PH.P$! 2.676 RTNR.P$1 2.808 ENRA.PS1 3:380 CFEC,PS1 4375.220 RCFF,PS1 1300.254 RCENoPS1 3968.781 RCNT.PS1 ~0~6.183 CiqTC,PS1 2@09.254 CFTC.PS! 1047.808 NPOR.PS~ 38.063 TENS.PS1 2280.000 CCh. PS1 0,008 18.955 1061,000 2711,753 19,895 18.608 1294,505 2967.703 21:636 ** E~I.'.' OF C;ATA **** FILE TR~IL, ER **** SFRVIC~ : FhlC VERSIO~ : OO1CO1 D~'rF : 95/05/ 2 M~X RKC SlZ~ : 1024 FIbF T~PE : baST FILE : Tame Veriiicatior~ ListJ. ng ~hlum~erger AlasKa Computino Center ~-SAY-1995 16:30 FIL~ NA~ : EDIT ,006 SERV!C~ : FLIC VERSION : OOlCOl DATE : 95/05/ 2 ~i~X ~FC SIZE : !024 F!b~ TYPE : LO LAST FILE : PAGE: 18 RA~ CU~v£s Curves a~d lo~ hea~er data for eac~ mass in seuar~te iiles; raw bac~oroumd pass in last DEPTH I NCREME~.iIT: 0,5000 FILF VEND0~ TOOL CODE START DEPTH ~:~o ..... ' ..... ";~;~7;. .... bOG HEADER DATA D A T'~j LOGGED ~UF'i't~ ARE VERSiO?~ Ti} DR iLL'iR VD LOGGE~CFT) TOP LOG INTE~V'~b B(,~TTO~; bOG IWTFRVAL ~,OGGT~,G SPEED (FPHR): DEPTU CO~,TPOI, ~.{SFO (YES/NO): TOOL STR!NG (T{iP TO BOTTOb) V~.{DOR TOOb COOF TOOL TYP~; ... ................ GP GA M~', A R~Y CC~, CA~I~,J~ CULG~ LOG TCC T~LF~,;E"~Y C~RTRIDGE S AND CASIr,;¢~ DATA !~Ot~g BIT SIZE (IN) t D~TLLERS CA~I~.~G D~PT{~ (FT): b0GG~.RS CASIt,~G DEPTg STOP DEPTH 9799,0 05-APR-95 42.2 1953 05-APR-g5 ~0693 0 1o6~o:o 9800 0 10677~0 N O TOOL NUMBER .... [:; .... CNC- 3 SGC-SA-593 CA[,-YA-28 TCC-B-839 9835,0 IS TaDe Verification bisttr~¢.~ chlU~ber~er alaska Co,~putlnq Center 2-~hY-1995 16:30 FLUID RATE AT ~'~{5!,k~;~D (~P~4): ~ ATKR CUTS ( ~>Cfii." ) g C~DKE (D~G)~ ~,~EUTRON TOOL M~TRIX: ~hTRIX DE~S~TY: HOL~ CORRECTIOf'~ BOTH SANDSTO~E 2.65 ~[{LUE[,I~E COUNT RATE NOR~ALiZATIO~M t~ OIL ZONE TOP MORL~.AblZING W!~,~DO:~ (FT): BASE ~OR~At.,IZI~.~G ~!?,~DOW (ET): [LL[!ELINE COUNT ~ATE SCALES SET BY FIELD ENGINEER FAR. COU!~OT R~TE LOw SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 3300 NEAR COONT RATE LtJW SCALE CCP6): 0 ~EAR CO0~T F~ATE R!GH SCALE (CPS): 9000 TOOL STA~,~DOFF (IN): ~E~:ARKS: TRE PRIMARY PURPOSE OF THIS LOG WAS TO FIND THE GAS/OIL CO 287 BBLS OF CRUDE WAS PUMPED P~IOR TO bOGGING, ~I!T T~EPE ~AS MOT ENOUGH CRUDE ON LOCATION TO PUMP WHILE b GAS kiIGRATED ~ACK INTO THE WELLBORE DURING I, OGGING. ~FTER PUNPING, WMP=O PSI AFTER bOGGING, WHP= 410 PSI. $ LIS FORUAT DATA PAGE: 19 ** DATA l;'ORaAT SD~:CIFICATIO~ PFCO~D ** SET TYPE - b4EB ** TY~E REP~ CODE VALU~ 1 66 0 2 66 0 3 7] 75 4 66 5 66 6 73 7 65 8 68 0,5 9 65 Fi 1! 6~ 13 !2 6~ 1~ 66 0 Tame V'eriflcatJ, on l,lstInq 2-~AY-1995 16:30 :hlumberger AlasKa Co...,..Puting Center ' " PAGE: 2O SET 'T'YP O R D DEPT FT 500 TNP.. PS2 BIJ 500 E~P~ PS2 PU 500 TNR~ PS2 500 RTNR PS~ 500 ENRA P$2 500 CFEC P52 CPS 500 CNEC P$2 CPS 500 ~¢f~ PS~ CPS 500 RCEN PS~ CPS 500 RCNT PS2 CPS 500 RCF? PS2 CPS 5(]0 CFTC PS2 CPS 500 NPOR P$2 PU 500 GP P$2 GAPI 500 T~NS PS2 LB 500 CCI, PS2 V 500 APl AP.I I API FILE SIZE REPR PROCESS ER # LOG TYPE CLASS ~OD NUMB 8AMP ELE~ CODE (HEX) 995 O0 000 O0 0 6 i 1 4 68 0000000000 995 O0 000 O0 0 6 i 1 4 68 O000OO0000 995 OO 00() O0 0 6 1 i 4 68 0000000000 995 O0 000 O0 O 6 1 i 4 68 0000000000 905 O0 000 O0 0 6 1 I 4 68 0000000000 995 O0 OOO O0 0 6 i 1 4 68 0000000000 995 O0 DO0 O0 0 6 ~ ! 4 68 00000:00000 995 O0 OOO O0 0 6 I 1 4 68 0000000000 995 O0 000 O0 0 6 i 1 4 68 0000000000 995 O0 000 O0 0 6 ! I 4 68 0000000000 905 O0 000 O0 0 6 1 I 4 68 0000000000 905 O0 000 O0 0 6 1 1 4 68 0000000000 995 00 000 00 0 6 1 1 4 68 0000000000 905 O0 000 O0 0 6 1 I 4 68 0000000000 905 O0 000 O0 0 6 1 1 4 68 0000000000 905 O0 000 0o 0 6 I 1 4 68 0000000000 995 Ou 000 O0 0 6 i 1 4 68 0000000000 905 o0 OOO O0 0 6 i 1 4 68 0000000000 995 {)(? 000 O0 0 6 i I 4 68 0000000000 DFPT. 10609.5Of TNRA.PS2 2.4~4 CNEC.PS9 34;{7.5q9 RCF~'.P~2 ~O04.569 GP.P~2 40.000 DFPT. 0796.50/; T~R~.PS2 2.2q4 C~!EC.PS3 5233.~41 RCFm,PS2 1~86.073 G~.PS2 86.565 ~.:PHI.PS2 20.007 T!!PH.PS2 18.055 ENPH PS~ RTF~R.PS2 2.591 E.,,RA.PS2~- 3 369 CFEC[PS2 RCEF'.PS2 1014.123 RCEN.P$2 3123~428 RCNT.PS2 C:>~TC.PS2 2499,590 CFTC,PS2 1026.930 NPOR.PS2 '~'E!''.P$2,, ,~b 1530.0t>0~ CCL.PS2 -0.018 NPgI.P$2 17.t77 TNPH.PS2 15.528 ENPM.PS2 RT~R.PS2 2.406 ENRA,PS2 2.492 CFEC.P$2 PCEF.PS2 1q93.283 RCEN.P$2 4664.631 RCNT PS2 C?~'C.PS2 3371.2e4 CFTC.PS2 1~99.837 NP[)R:PS2 TENS.PS2 22~5.000 CCL.P~ ~2 O.Olg 18.523 1035.076 2650.867 18.055 11 705 2100:34! 16.216 Tame Verification ~.~istino .-hlumber~er AlasKa Computln0 Center **** FILE TRAILEP FI'L~ NA~IE :. ~]DIT .006 SERV] CE : FLIC V~RSION : OO!CO:i DATF : 95/()5/ 2 MAX kEC &!ZE FILE TYPE : LO L,~ST FILC 2-~hY-~.995 16~30 PAGE: **** .FIbE HEADER *~** FILE NAF~E : EDIT .t~07 SERVICe; : Fb!C VERSION : O0~.CO1 D~TE : 95105/ 2 M~X REC SIZE: : ~,024: f'IbE TYPE : LO LAST FI LB : FILE i4EADER F!LF ~U~BER 7 ~ C~!RVES Curves and ioq ~teader data ior each pass in separate ¢iles; raw back~round pass in last file P~SS 5U~BER: 3 DEPTk INCREME~,~T: 0.5000 # F?LF SUMM~RY VF,~,iDOR TOOl, '"'{"' .... CN. fi, 0 LOG HF~DE~ DATA DATE LOG~ED: Si]FTWA~E VERSlr~q: TD D~ILLER (FT~: TD LOGGER(F~~): TGp ~.,0~ ~NTE~VA4 POTTO~4 LOG It'~T~RVA}, (FT): LOOGI~4G SPEEP (F'P~R) Df;PTg CONTROL ~SED TOO[, STRT~C (TOP VE;,iDOP TOOL CO[yE TOOL TYP~: " GR CCL C~SI;~{G COLLAR LOG TCC TELEMETRY C~RTFIDGE $ STOP DEPTH 9800,0 05-APR-95 42.2 1953 05-APR-95 10693.0 10680.0 9800.0 10677.0 N O mOOb SGC-SA-593 CAL-YA-28 TCC-B-839 Tape Veri~.icatio~ Listin~ :blue, berber Alaska Co~:putln.0'. Cer~ter 16:30 DPILL~$ CASI~G 1)~PT~ (FT): DOGGERS CASI~G DEPT~ FLUID TYPE: FLUID DE~,.I LB/G): SURFACE TE~PER~'~TURE (DEGF): BOTTO~ ~Ol,g '¥F~iPE~TL}EE (DEGF): FLUID SALI~IiTY FLtJID LEVEL FLUID RATE ~T ~ATER CUTS GAS/OiL RATIO: CHOKE ~EU'YRON TOOL TOOL TYPE (EPTTHERMAS OR MATRIX: ~ATRIX DENSITY: HOLE COPRECTIO~ (IN): 9835,0 CRUDE BOTH SANDSTONE BbUEL1NF, COUNT RATE NOR~'ALIZATIO~.: I~ OIL ZONE TOP NOR{4~,LIZING WINDO~; (FT): BASE NOR~::A!.,IZING WINDOW (FT)~ B!.,UEb~NE CO~T PATE SCALES SET BY FIELD E~G!NEER FAR COilNT RATE LO~'~ SCALE (CPS): O FAR COUNT RATE HIGH SCALE ~EAR COU~,~T }(~TE LOW SCALE (CPS): O ~iEAR COUNT ~:ATE ~'~IGH SCAI~E (CPS): 9000 TD~[, STANDOFF (I.N): ~'.~A~KS: T~: PPi~-~ARY PU~PGSE ()F This i,OG ~AS TD FIND THE GAS/OIL CO 287 ~.~[.S OF CPUDE v;AS P~)~'PED PRIOR TO bUGGING, Sl~r 'IULRE ~'~S hC~T F. NOUG~ CRUDE [)f~ LOCATION TO PUMP WHILE b GAS ~:t(.;~ATED BACk iNTO TEE WELbBOPE DUPIP~G LOGGING, AFTER PU~..~Pl ~ ~}~P=0 PSI AFTER LOGGING, WhP= 410 PSI. r~Si~~,,., ~ Gc~C 0 . '- l'.!~ ~ =1 60~' ' I, TS F'O~AT DATA PAGE: 22 ** .r~,TA FORe, AT SPECIFICATIOr~ ~,~EC[)RD ** ** SET q'YPK - 64EB *% T~PL EEPP CODE VALI1E 2 66 0 iS Tape Verificati. om List!,an ;hlu~b¢:r~er Alaska Computtnd CeDter 2-~AY-~995 PAGE: 23 · Y~g : V'ALUg. 3 7 3 76 1 1 1 1 1 0 mmmm~mmmmmmmmmm~m~mm#~mmmm! ** SET TYPE - CHAN N~F SERV UNIT SERVICE API ID ORDER # LOG P FT 500 .5 O0 o o ~PHI PS3 PU 500995 O0 000 O0 0 TNpH PS3 PU 500995 O0 000 O0 0 ENPH PS3 P!J 500995 i)O 000 O0 0 TNRA PS3 500995 O0 000 O0 0 RTNR PS3 500995 00 000 00 0 ENR~ P~3 5{)(!995 O0 000 00 0 CFEC PS3 CPS 500995 oo 000 O0 0 C~EC PS3 CPS 500995 00 ~()0 O0 0 RCEF P$3 CPS 500995 O0 000 O0 0 RCEN PS3 CPS 500995 O0 OOu Oo 0 RC~¢ P$3 CPS 500995 0(~ 000 O0 0 RCFT P$3 CPS 5009~5 O0 000 O0 0 CNTC P$3 CPS 500995 OO 00o oo 0 CFTC PS3 CPS 500995 00 oO0 00 NPOR PS3 PU 500995 00 000 O0 0 GD PS3 GAP1590995 00 00(, Oo 0 TEi~S P83 LB 500995 00 000 O0 0 CCL P$3 V 500995 O0 000 O0 0 AP! AP1 hPI FILE NUmB NUMB SIZE REPR PROCESS 'I'YP~3 CLASS ~UD Ntt~B 8A~P ELE~ CODE (ME'X) OU 0 7 1 I 4 68 000000000 0 1 I 4 68 0000000000 7 7 I I 4 68 0000000000 7 I 1 4 68 0000000000 7 I 1 4 68 0000000000 7 I 1 4 68 0000000000 7 i ! 4 68 0000000000 7 I I 4 68 0000000000 7 ! 1 4 68 0000000000 7 1 I 4 68 OOOO000000 7 1 I 4 68 0000000000 7 1 1 4 68 0000000000 7 1 1 4 68 0000000000 7 I 1 4 68 0000000000 7 1 I 4 68 0000000000 7 1 1 4 6~ 0000000000 7 1 ! 4 68 0000000000 7 1 1 4 68 0000000000 7 I 1 4 68 0000000000 ~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm~Immmmmmmmmmm D~.PT. 10708.000 HPHI.PS3 T~,~R~,PS3 2.597 R"FNR .,. S3 RCFT,PS3 1016.71~ C~'~TC. PS3 GD,PS3 35.531 TENS.PS3 21.769 TI~Pt-I.P$3 19.649 ENPH PS3 2.709 f~RA.?S3 3.404 CFEClP$3 996.722 RCEN.PS3 3100,935 RCNT.PS3 2648.454 CFTC.PS3 1039.036 NPOR.PS3 1670.000 CCL.PS3 -0.015 18 802 !0171315 2808740 19;649 IS TaDe Veri£icstion Listinq :hlumber.ger Alaska Computing Cepter 2-~AY-1995 16130 PAGE DEPT. 9800.000 ~PBI.PS3 TNRA.P$3 2.253 RTNR.PS3 CMEC.DS3 5254.064 RCEF'.PS3 RCFT..P$3 1,486.073 CNTC.PS3 GP.PS3 66.~13 TE~S,.PS3 i6.590 TNPH.PS3 P.~81 ENRA.PS3 2037.~7P RCEN.PS3 3176.432 CFTC.PS3 2160.000 CCL.P$3 4.825 ENPH.PS3 2.564 CFEC.P$3 4680.802 RCNT.P$3 1538.215 NPOR.P.$3 0.010 12. 240 2049.334 3577.017 14,052 **** FILE TRAII, E~ FILE NA~E : EDIT .007 S~RVICE : FDIC VERSION : OOtCOl D~TF : 95/05/ 2 ~AX ~EC 8iZ~ : FILM TYPE LAST FIDE **** TAPE TRAILER 8~RVICE NaaE : EDIT DATF : 95/057 2 ORICIN : FL!C TAP~ ~A~E : CONTINUAT!£!~i ~ : I P~EWlOU$ TAPE CON~ENT : ARCO ALASKA' !NC., PRUDHOE BAY, D.$. 15-17, APl# 50-029-21!26-00 **** REd, I, TRAIbER **** SMR¥]CE N~M~ : FD!T DATE' : ~51o5/ 2 ORIGIN : Fb!C REEL NA~E : 95155 CO~'~F':~;T : ARC(5 AI,ASKA I~C., PRUDHO~ BAY, D.S, 15-17, API~ 50-029-21126-00 RECEIVED JUN ~ 2 1995 A~aska Oil & Gas treas. Commission ~mmmmmmmmmmmmemmmmem~mmmemmmm~ Verification ].,i stlncl :hlumberger ..:{lasK:a Co~,:putl. nq Center 16-JUN-.1, 995 {:,8: 25 D.~TE : 95/06116 ORIGI~ : FLTC REEL ~< A ~ i'{: PRf3VlOUS PEEL CO~:~E~.~T : ~R('{J .ALA8~ !'~.:~C., PRU[:~:~K BAY, DS t5-17, 50-029-21~26-00 PRUDHO~d OPEP~TiJR: JOB ~i[]~.~;~5~': DPEPATO~ ~IT:FSS: fiUR~aCg bOC~TIO SFCTi~: TO~ ~,:~ ,5 ~ 1P: FSL: WFLI~ CASI~:G IST SI X I.~,;G 3.~D STP] 5 ~92112600 ARCO ~LASKA, INC. 15-0U~-95 951~0 40, uO OPE~ }~ !',Lt, CASIJ~:G DRILLE~:$ CASING i':,IT SILC (Il',:) SIZE (1~) D~;PTI{ (~T) ~EIGHT (LB/FT) 9,625 9835.0 47,00 a.500 7.0(~0 10639,0 ~9.00 g.500 7.000 10834.0 27.00 4. 500 9520. U I 2,60 PAGE:: -hlumberq'~er Alaska Corn~utinO Center i6-JUN-1995 08.:25 DEPTH .... ------ 1.0621 .C ! 062! .0 0480.5 ! 048'9.0 0357.0 l. 0356.5 ~0124'5 !0126.0 99~')8 0 9929,5 990:!, 0 9~02.5 9642,5 9~43,5 100,0 1{)~ .0 GRCH FROM PaSS 1. Si:l~lrTgP TO OPE?,t HOhE GR.BCS. AI}L CIJ~{Vt:$ FUR P.AS~'; J. CARRIED ~I]i~ THE GRCH SHIFTS, PAGE: **** i,' T t:,?; HEADER **** , ~,,:, : E()IT .001 SERVICE : FLIC VFRSIO~;~ : OC~ICO! DATE : 95/06/16 F!LF 7' YP~: : L~ST FiLE : FILE ~:~JuBmR: 1 E~ I ~F:[; CbRVE5 Pepth Shifted and cli_p~e~ curves for each ~ass in seoarate files. TOOL CUE'E; ST3. RT Di~]PTH 10673,0 3~IFT DA'fA - PAgS 'TO ~ASSf~,":EASU~ED DLPTH) IS Ta~e Verilication Listi, nq chlumberc3er AlasKa ComputJ.~g Center 16-JbN-1995 PAGE: API h bPI' Nti~B N . SIZE R R P~OCESS TYPe CI.,.~.5G ~,~[_D ~.;ttMS Sb~P ELE~ CODE (HEX) 00 C) e (; 1 1 4 0000000 NPF!T .c;'imG PU-S 5£,!~,)37 9 .'3 000 UO v ! I l 4 68 ;,,,,~g C:':'I" qL:1ot7 ()f~ ~')~.)P O0 '; 1, 1 1 4 68 FC~,~T .... c~ mt"., CPS ..... ~,1k~37 r'ln. "00., 00. ~; 1 ~ 1_. 4 6a C~'rC C~ T(; CPS 5t.~937 O0 (~;)n 0(~ ¢3 '1 I 1 4 6~ C >'~ E C C'~ "' <;; C P S 5 ~.:: 1 ~.;, 37 ~.) 0 P 0 o (; r: '-, !. !. t 4 fl ~ CFEC 'C:;~'C:;, C~6 ~:,1.)37 .... <~f: (,jo. Ur~., ,- ..., I 1 a 6q,. O00OO00000 0000000000 0000000000 0000000000 O00OO00000 0000000000 0000000000 0000000000 0000000000 O000r)O0000 r~OOUO00000 O000OO0000 IS Ter, e verff~cat~on ListJ. r-iq ,:hlume:er<:~er ?<].as'~a Com:.'.u. tf.na Cent'.er . ~ ....... . ~.~ '~ ¢7} ..... · ..... ~D O~Eq ~ LOG 'I'Y~K Cb~:~$ mop xU~:~ SA~P ~i..,,E~ CODE (HEX) GPCV~ C?,:TG GAPI %01 O37 O0 000 O0 {.} ! ! 1 4 68 0000000000 'f~N~ CL:,TG i,,R 501037 OO OPO O0 <} ! I i 4 68 0000000000 G~ ~CS G~PI 561037 oO o00 O0 0 I, ~ 1 4 68 0000000000 * * {} A 'F h * * DEP?. i 0695 NPAT.Ct{T6 -999.259 FCNT.CNTG CF'EC.CSTG DEPT. FCNT.CNTG 1685.4-05 CFEC.C?,TG !419.734 ** E:N!.~ OF f) A?A ** . ~',i H CNTG -999 250 CPHI CNTG -999. 250 gNRA.r'r,J'fG_ -999~250 NCNT~CNTG -999.250 CFTC.C¢~TG -999.~50 CNEC.CNTG -qa9 25o TEN'~ ~?,TTG -999 250 GR BCS .... C~'J~G 2~ 900 CPHZ CNTG 2.791 Et,~R A, C,¥T~ 4 002 NCNT~CNTG 2220.500 CFTC.CNTG 799:781 CNEC.CNTG . ~ "'t'" 64 270 ,'E~8, 3530,375 GR,BC8 ......... C",' TG 1] 045 CPHi ,C~}TG 1~ 234 EE{PH,, I. 854 ~ ~ R A. C )',~ 1' G 2 ] 671. N C ~ T. C N T G 3!89.511 CFTC.CNTG 1752 420 C~,{EC CNTG : · J ~ I7.~91 TENS c~,rG 3320 000 GR~BC8 35.1 20 ENPH. C~ITG 32.941 CPHI.CNTG 3.329 M~,~R ~. C~TG 4.957 NCNT.CNTG ' ~ 160:1.102 (,~ TC. C~JTG 503,625 CNEC CNTG 40.406 Tg~o. C~TG 3340.000 GR:BCS 99 250 99 250 46.719 27'276 2279,:125 3275'688 83,375 13,645 32922981 3792,037 18.906 35,338 1647.896 ~919..572 999.250 IS ~'a~e Ver..i. tlcatlon c h 1 u m b e r 0 e r .a 1 a s K a C o ,'. p t! :t ! n q C e n t e r 1 6 - j U [',! - 1 9 9 5 PAGE: cl, ! ppeci curves 2 0 5 O 0 each DaSS STOP DEPTH 9~00.0 ~e~th shifted D~PW~q ~ A $ ~:: I., i "a:, ,. cltavE. .FDk 5~ IFT8 ;['"7; 0~(,2 040! 0 3 5 6 O1E:3.0 (~ 110 992~,a 9~ 4 ? q~2B.Q in separate fl, les. PASS 2 SHIFTED IS Tane u~'er~ficati, on ~istlaa hlumberger a]asK:a .... om~?utinO (?enter i6-JUH-!995 02:25 PAGE: ** bPI G :YYPE fi. ('; fl 0 FI F'II, E i,i . B ['.iUNB ., ZE REPR PROCESS ~,,OD K: U !vl B SA~P V' L,E t-~ CODE CHEX) · I 4 8 000 O 0000 0 2 1, I 4 68 0000000000 0 2 1 I 4 68 Or) OOOnO000 0 2 1 I 4 62 00U0000000 o 2 1 ! 4 6R O000o(.)OOO0 O 2 1 I 4 68 o000000000 0 2 1 ! 4 6~ 0000000000 n 2 1 ! 4 6~. OOuO00OO00 0 2 1 1 q 68 0 0 0 o [, o 000 0 0 2 1 t 4 t~8 OOO0000000 o 2 1 1 4 68 OOOOoO000O O ? 1 I 4 6~ 0o000o0000 0 2 ! 1 ~ 68 oonnooo0oo 0 2 1 ! 4 68 OOOOOO0000 0 2 I 1 4 68 OOUO000000 :, :*: t') A T h * * IS *aee 'verification Listing 16-J[!~,!-].995 09:25 :hlt~r~bercer .qt~$ka Computir~ Center NPAT. ¢?~.iTG -999,25<) CR ~,T, C?~TG -999,250 FCtqT. C5 ~(~ -999.2%0 C~TC. C~,~TG -999.250 CFTC, C~TG CF'MC. C?< TG -9C9.25~ GRC~. C~.~TG -999.?50 -999 250 - 99: -999,250 3480, 22 860,~79 3339,750 13.793 2°770 5~9 1794,~ 3296,0C0 CPHI.CNTG NCMT.CNTG CNEC.CNTG CPHI.CMTG NCNT.C~TG CNEC.C~TG CPHI,CDTG NCMT,CNTG CMEC,CNTG CPHI.CSTG NCNT.CNTG CNEC.Ci~TG :~99'. 250 g9.. 250 '999' 250 :24.903 2328'536 3205.027 13,532 3236,856 3917,377 :999.250 999.250 -999.250 C{:,qVl:5 C(>c,<,ens~ted )~et)tFon: Arithmetic average ~,:;eqtror~: :~naverage<j edited P~sS static of edited passes for all curves. Gamma RaV ar';d oackround counts; etcher curves. arithmetic average 16-JLi~,~-1995 9,2,- 95 , ' ,.. " , ...... SIZr EP ROCESS v I~' ~ F;~' V Pt /'~P APl APT ........... i, ,.-~ .... E.,E~ CODE (hEX) 7; " i~ ': ..... ; .......... ; ....................... ;;;'; ....... DFPT Su!~) .~:~,)~):;: (~ 0 3 I 4 OB 0 00000 0000000000 0000000000 0000000000 t)O00000000 0000000000 OOOO000000 0000000000 0000000000 O000000000 O000gO0000 IS Tape Verification Listino. :hlumberger ~lasKa Co,'~pt]tinq Center t F,-JU~q- J. 995 OF3: 95 PAGE: CNEC .~:a. CPS 5 ! 7 00 0 ,~, c0 o 1 I 4 8 0000 0000 CFEC Ci',;.~V CPS 501 0]7 O0 0o0 o{> 0 3 1 i 4 68 00000o0000 G~C~ CF;'.rG (;aPl 50~ 0~7 oO O~'.;O OO O 3 1. 1 4 6S O000OO0000 TENS C:::4TG L8 5010]7 0() (>09 O0 0 3 I, 1 4 68 0000000000 ** {>,ST A 2bO NRtl' 999 250 C~,AV CPHI.CNAV 25 () C F T C. C r,~ A V 999.250 C NE C. C !~ l V 250 TEl "~:io,C~,~TC 3645. " ~':,~ C" AY 23 323 E~>i~.A.C ~ 3.937 NCI(T.C~AV 179 C~4T(,.C~,]t~V,,~ .,, ..,,, 2236:224 CFTC.,C~,aV, 830,130 CNEC.CNAq 11.4:2t NRtT,Cf<~AV 1 90I CPHI.Ci'~AV 13.,!i 9 ENRA. C~a~V 2~720 NCNT.C[~AV 20. :14 ? C F T C. C ,~',~ h c~ 177 ]: 474 C N E C. C !~ a V . ~ 3320 600 17,891 TENS ~,,, t,' :r., DFPT. 98("~0.500 ~'.; PHi. C~! a v 36.409 NR I.T. C~AV 3.362 CPHI.CNAV F'C~,~'[Ct:~V 45').3q:~ C~'~'rC:C:.:Av 164a.0~ CFTC.,,-. av 48~J.~ CNEC.CNAV CFEC. C~,,AV 57!.117 /; N C ~4. C ~,~'~]"G 40.4':~6 ~ENS. C"~'TG 3340.000 999':250 9 99.,2.50 999;250 26~ 090 3240.357 I 3. 589 3264.918 3854,707 36 593 !650i938 2914 962 PAGE: R~ CU'a YES Curves and loci header data i:or each pass in seoarat, e files; raw beCKgTOUDO pass in last PASS ~i,~,'![-:~E:R: ! D~PT~.i ,[ !"~CRd'~:'iENT: 0. 5000 Vk:ND~)R TOOL CO!}k', ST~T DE;PTN STO~' DEPTH · . · ~ , : ,> . ~l) L, SGC~i~ CFT): ~)'r~'-', ~" nG l~:'t'~;;'V;~t· (FT): 42,2 1204 10678.0 9800.0 ~0672.0 1 80 (). 0 lO-NAY-95 T (') 0 L, N t.; r-! R E P, 995 u8;25 CAb~ {CPS): 0 SCALE Pt~:~:~K9 ~.T 5 :~';?; T~ DiSPt~A. CE AqO B~GAN BOGGING AFTER 260 BB .., ~, .... ,. , It,:. ~SS ~4A~ G/)OI':, AnOVa] F~F:F~. BUT i;~AS ?,lOT PR SENT~D DUE TO S PAGE: IS Tape Yerification !~istJ, n'a cblUmberger A~asKa Com?ut~n~ C e n t ~, r l 6-J 0 f,~- !. 995 PAGE: 12 0 R D ]!,' F~ 50 O. 7 P U 5 (~' ! t> 37 p !~ 5 q, t ;) 37 P U 5 O ~ ('; 37 501037 5C'~ ~}37 CPS 5~.~ 037 CD5 5ut,~>37 CPS 50![~37 CPS 5(>!<~37 C E 5 ~ ,') 1. 0 '~ 7 CPS 5<;t937 C P 5 ~ C ! (:, 37 C. o 56 t 0 ] 7 G~P] 5t>1037 L ;~ 5 (' ! (; '] 7 4 1 I 4 68 0000000000 4 1 ! 4 68 0000000000 4 1 ! 4 68 0000000000 4 I I 4 68 0000000000 4 1 i 4 68 0000000000 4 1 1 4 68 000000000.0 4 I 1 4 68 0000000000 4 1 1 4 68 0000000000 4 1 1 4 68 0000000000 4 i 1 4 68 0000000000 ~ I I 4 68 0000000000 4 I I 4 68 0000000000 4 1 1 4 68 0000000000 4 1 I 4 68 0000000000 4. i 1 4 68 0000000000 4 I 1 4 68 0000000000 4 1. I 4 68 0000000000 mM~mm~m~mmmmmmmmmmmm~mmm~m~mm~m~mmm~mm~Mm~m! 17 6'> . .3 Ei',iPa. PSl 21.315 TNPH.PS1 2.376 E~!RA.PSI 3.795 CFEC.P$1 1321.998 RCE!'.].P.~I 4652,0~5 RCNT,PS1 322fi ~25 ...FTC. Pol 1406.'114 NPOR.P$! 25.2t;7 EI',!P',. PS 1 22.a%0 TNPH.PS! 2.825 EhPA. P:,31 3,~84 CFEC.PS1 ~ ~5.'~,17 PCE4. P;~I 3081 .n,36 RCNT.DSI 2262.8i! CFTC.PS1 818,725 NPOR.PSI '34 8 (). ')t) O 12.287 ENPH.PSI 14,067 TNPh. PS1 1.995 E?~RA.PS1 2,806 CFEC.P$1 1335.659 ~CEi~.P~I 3546,914 RCNT,P$1 3132.~12 CFTC,PSI 1655,g86 NPOR.PS~ 20.154 328 2]94 20,154 27,008 840.804 2354.702 26,357 14.614 1332 59o 32!6~186 14,426 IS Ta~,e Ver~fi. cation ~,ist~,nq =hlUmber~r Ala~-''',~a Co~::fl)'tJtin~ C.e~ter 995 {)8 :.25 35o120 ENPH,PS! 3,250 ENRA,PAI 502.909 RCEN,P$1 168~.!()2 CFTC,PSI 33i0.000 4]957 CFEC'P$1 2734,693 RCNT,PHI 503,625 NPOR.P,S1 PAGE: 35 i)38 588i928 1647 $96 ~6,487 F I b E ~,! t~ ¢,! i'!; : ~',',, i;; 1' T ,00 5 8FRVICE : VFRS!Oh : 0 i,.~ ! ~X RF"C $'[ZF : Curves an¢ loq header data for each pass .tn separate Itl. esl raw bacKqround oass in last file 979q.0 ! O-d AY-.95 42.2 1204 I O-r';AY-95 :hium~er~r i~,la~Ka ,.qou'p~tin;] (i:ent~r .!. 0 6 7 2. 1 8 0 NO : FbU'[o DE{~$I'rY Cb~/G): F[,t..)T!) SAbi~]T'.!.."Y (PP~'4') ~ F'I..UID LEVEb (Vi'): .... .., ........... . E] CHt) K[:: (DEC): ~;~ ~ T P I X; S A b! O S T 0 ~ E ~,t~T~'rX DE~,~S 7i5'Y: 2.65 FsT,{~I.,:T<iV Ci]i]~' r?fl~] Nrl~:~';ik~ IZATIOi<~ :l~' tnJL, ZOt.iE RAS~~ ...... :',.lr~Xal..t. ZIr~iG t.,T~:'~;'~v~ CF"' "~'~a COtJ~".~' ~'~'~ hot,: Set, bE (CPS): 0 ~li~"~t:;l. 7~57 R:'~I,L':k C~:<tJD~: At~:[:' 2o ~bt, ~IESKL pt],,,i~r. ,s'f 5 ,~c,,' 'rC~ njSp!' ACE ....... . ............. ' ecrl<~' ~'~: offsS ~9 ~q' 1n37i' Tgb~~ vT[?y .,..~ PAGE: 14 .'hlumberg~r AlasKa $ # PAGE: 15 ............. . OFpm F~.~ T ~ R n P S '2 R~K~D PG2 C~EC PS? CPS RCEV c59 r ~,,~ RC~'~ ? PG7 CPS RCF· D;~'2 CD5 CWq'c P"~ I FIlE ..... i,,i~, SIZE REPR ROCESS :hlumber...q~er .~,]as:~a Co~p:.~t~.nq Cer, ter PAGE: 16 26. q 7 c~ E i~P ?i. P S 2 23.774 T N p H. P S 2 ~ , ~ .I :?., ~ 3075 719 RCNT.PS2 2248 6':~0 C~C, o~. . , P52 ,3270.0 o 0 DEPT. 1000o. 0~:~L? !,,!p~4]. pS2 11.7()6 ENPH:. PS2 14.601 TNPH. PS2 ~ 2 8'75 CFEC PS2 T~,~P~ PS? I ~o:t,. P'r"~4~i PS2 2,035 E~:~R.~.~ C~EC,P'$2 38tl.576 PCEF.PS2.~ 1356.a84 RCL~".~' ,PS2 3674:031 ReNT,PS2 C T' . RCFT'.PS? IOR~ ~4.(.) C~'~TC.PS2 30~8.276 .F C.PS2 1654.025 NPOR.Po2 GP,PS'~ '19,563 TE~S.PS2 3~60.00() ': . P S 2 DEPT. q7q~.St?',.'~ kP'~4j:.?S2 37.a17 ENPi,:! PS2 36 082 TNPN. T~R~.PS2 3.~71 ~T"'~.'. .PS2 3'474 E~4R~.Po2'" 5:260 CFEC.PS2 C~:~'C.[,.:;.~ P91n.3~2 2 5hA 7~] RCE~,i PS2 2841.695 RCt~:T P~2 RCFT.~S? /~59. b()2 C}?~r~',. PS2 i635.006 ~ . *,~ ~ e . m :~ , !24 707 324 i ,49 19.842 26.442 80' 331 26,690 14.282 1325,789 30118.693 14.753 '37.848 553. 305 1653,980 38'177 15'17, 50-029-21126-~0 PAGe: ¸17 * HHHH HHHH * * HHHH HHHH H H A LL LL II BBBB U U RRRR TTTTT O N N * * HHHH ~ H H AA LL LL II B B U U R R T O O NN N * * HHHHHHHHHHH HHHH A A LL LL II BBBB U U RRRR T O O N N N * * ~ H H ~ LL I~ II B B U U R R T O O N 1~ * * HHHH HHHH H H A ALL LL II BBBB U R R T O N N * * IqttttI-I ~ * *HHHH HHHH L O G G I N G S E R V I C E S , I N C · * . * * · * * * * * * ******************************************************************************** * LIS TAPE VERIFICATION LISTING * * ARCO ALASKA INC. * DS 15-17 Oil ~ * PRUDHOE BAY ,, .~" * NORTH SLOPE ~- * ALASKA * * (DUAL SPACED NEUTRON LOG) * * * Page I SERVICE NAME DATE ORIGIN OF DATA REEL NAME REEL CONTINUATION NUMBER PREVIOUS REEL NAME COMMENTS: --- COMCEN --- 91/12/05 --- 666182 ****************************************************************************** TAPE HEADER RECORD .............................. TYPE 130 SERVICE NAME DATE ORIGIN OF DATA TAPE NAME TAPE CONTINUATION NUMBER PREVIOUS TAPE NAME COMMENTS: --- COMCEN --- 91/12/05 ~ 0 ****************************************************************************** COMMENT RECORD TYPE 232 TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: 15-17 API NUMBER: 500292112600 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: HALLIBURTON LOGGING SERVICES TAPE CREATION DATE: 05-DEC-91 JOB NUMBER: L66618-2 LOGGING ENGINEER: ROEDER OPERATOR WITNESS: MORRIS SURFACE LOCATION SECTION: 22 TOWNSHIP: 11N RANGE: 14E FNL: 736 FSL= FEL: FWL: 141 ELEVATION(FT FROM MSL 0) KELLY BUSHING: 71.00 DERRICK FLOOR: 70.00 GROUND LEVEL: 40.00 Page 2 WELL CASING RECORD OPEN HOLE CASING DRILLER'S CASING BIT SIZE(IN) SIZE(IN) DEPTH(FT) WEIGHT (LB/FT) 1ST STRING 13.375 2497.0 72.00 2ND STRING 9.625 9835.0 47.00 3RD STRING 8.500 7.000 10834.0 26.00 PRODUCTION STRING 8.500 4.500 9520.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE= GR PBU CURVE CODE= BCS RUN NUMBER= PASS NUMBER= DATE LOGGED= LOGGING COMPANY= N/A BASELINE DEPTH .......... EQUIVALENT UNSHIFTED DEPTH .......... CNSG 9784.0 9783.0 9842.5 9841.5 9901.5 9899.5 9947.0 9945.0 9996.0 9994.0 10042.0 10040.'0 10112.0 10110.0 10158.0 10156.0 10222.0 10220.0 10270.0 10268.0 10317.0 10316.0 10357.0 10357.0 10402.0 10402.0 10458.0 10458.0 10502.0 10502.0 10540.0 10540.0 10603.5 10604.0 10663.5 10664.0 10711.5 10712.0 $ REMARKS= TIED INTO CNL DATED 27-OCT-89. $ ****************************************************************************** FILE HEADER RECORD .............................. TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.001 --- 91/12/05 --- 1024 Page 3 FILE HEADER FILE NUMBER: 01 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 01 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH CNSG 10709.5 9785.0 $ CURVE SHIFT DATA - PASS TO PASS. (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 01 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH CNSG NO NPHI CURVE PRESENTED DUE TO INABILITY TO RECOMPUTE AT THIS TIME. CPHI PRESENTED WITH THE FOLOWING PARAMETERS: BIT SIZE: 8.500" CASING SIZE: 7.000" CASING WT.: 26.0002 PUMPED 346 BBLS PRIOR TO PASS 21. WELL ON VACUUM. $ LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY i i 66 0 2 1 66 0 3 2 79 24 4 i 66 1 5 i 66 1 8 4 73 60 9 4 65 .lIN 11 2 79 42 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 i 66 i Page 4 0 I 66 0 DATUM SPECIFICATION BLOCKS= MNEM SERVID SERVICES UNITS API CODE FILES SIZE SSAMP REPR. DEPT F 00000000 0 4 i 68 GRCH CNSG 666182 GAPI 00000000 0 4 i 68 FUCT CNSG 666182 CPS 00000000 0 4 i 68 NUCT CNSG 666182 CPS 00000000 0 4 i 68 CPHI CNSG 666182 PU-S 00000000 0 4 i 68 NRAT CNSG 666182 00000000 0 4 i 68 ****************************************************************************** DATA RECORD TYPE 0 DEPT = 10709.500 GRCH = 46.200 FUCT = 457.900 NUCT = 467.900 CPHI = 20.850 NRAT = 1.060 DEPT = 10609.500 GRCH = 49.100 FUCT = 305.900 NUCT = 364.300 CPHI = 29.950 NRAT = 1.232 DEPT = 10509.500 GRCH = 24.500 FUCT = 537.100 NUCT = 529.000 CPHI = 18.576 NRAT = 1.022 DEPT = 10409.500 GRCH =~ 52.700 FUCT = 320.900 NUCT = 397.700 CPHI = 31.720 NRAT = 1.261 DEPT = 10309.500 GRCH = 21.000 FUCT = 673.500 NUCT = 609.400 CPHI = 14.764 NRAT = .932 DEPT = 10209.500 GRCH = 25.700 FUCT = 976.900 NUCT = 776.300 CPHI = 8.533 NRAT = .819 DEPT = 10109.500 GRCH = 46.300 FUCT = 354.500 NUCT = 401.800 CPHI = 26.480 NRAT = 1.172 DEPT = 10009.500 GRCH = 28.900 FUCT = 627.300 NUCT = 560.200 CPHI = 13.811 NRAT = .930 DEPT = 9909.500 GRCH = 37.500 FUCT ~ 682.800 NUCT = 599.500 CPHI = 13.005 NRAT = .908 DEPT = 9809.500 GRCH = 37.600 FUCT = 247.300 NUCT = 312.800 CPHI = 33.510 NRAT = 1.317 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 Page 5 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.001 --- 91/12/05 --- 1024 --- LO --- COMCEN.002 ****************************************************************************** FILE HEADER RECORD .............................. TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.002 --- 91/12/05 --- 1024 --- LO --- COMCEN.001 ****************************************************************************** COMMENT RECORD TYPE 232 FILE HEADER FILE NUMBER: 02 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 02 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH CNSG 10707.5 9789.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 01 ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH CNSG 9788.5 9788.5 9841.5 9842.0 9899.5 9900.0 9945.0 9945.0 9994.0 9994.0 10040.0 10040'.0 10110.0 10110.5 ~10156.0 10156.5 10220.0 10220.0 10268.0 10268.0 Page 6 10316.0 10357.0 10402.0 10458.0 10502.0 10540.0 10604.0 10664.0 10708.0 $ REMARKS: 10316.0 10357.5 10402.0 10458.0 10502.0 10540.0 10604.0 10664.0 10708.0 NO NPHI CURVE PRESENTED DUE TO INABILITY TO RECOMPUTE AT THIS TIME. CPHI PRESENTED WITH THE FOLOWING PARAMETERS= BIT SIZE= 8.500" CASING SIZE~ 7.000" CASING WT.= 26.0005 PUMPED 387 BBLS PRIOR TO PASS #2. WELL ON VACUUM. $ LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY i i 66 0 2 i 66 0 3 2 79 24 4 I 66 1 5 1 66 1 8 4 73 60 9 4 65 .liN 11 2 79 42 12~ 4 68 -999.000 14 4 65 F 15 i 66 68 16 i 66 1 0 i 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICES UNITS API CODE FILES SIZE ~SAMP REPR. DEPT F 00000000 0 4 I 68 GRCH CNSG 666182 GAPI 30310010 0 4 I 68 FUCT CNSG 666182 CPS 42334300 0 4 i 68 NUCT CNSG 666182 CPS 42334300 0 4 1 68 CPHI CNSG 666182 PU-S 00000000 0 4 1 68 NRAT CNSG 666182 00000000 0 4 i 68 ****************************************************************************** DATA RECORD TYPE 0 Page 7 DEPT = 10707. 500 GRCH = 45.600 FUCT = 451. 500 NUCT = 466.900 CPHI = 21.670 NRAT = 1.064 DEPT = 10607. 500 GRCH = 42.000 FUCT = 395. 600 NUCT = 452.400 CPHI = 26.660 NRAT = 1.181 DEPT = 10507. 500 GRCH = 28.600 FUCT = 521.300 NUCT = 518.800 CPHI = 19. 550 NRAT = 1.031 DEPT = 10407.500 GRCH = 42.500 FUCT = 273.100 NUCT = 365.200 CPHI = 38.540 NRAT = 1.369 DEPT = 10307.500 GRCH = 22.300 FUCT = 647.900 NUCT = 590.000 CPHI = 15.211 NRAT = .940 DEPT = 10207.500 GRCH = 22.100 FUCT = 976.100 NUCT = 761.500 CPHI = 7.815 NRAT = .808 DEPT = 10107.500 GRCH = 28.800 FUCT = 402.200 NUCT = 459.600 CPHI = 23.850 NRAT = 1.168 DEPT = 10007.500 GRCH = 24.400 FUCT = 613.700 NUCT = 569.800 CPHI = 15.775 NRAT = .961 DEPT = 9907.500 GRCH = 35.800 FUCT = 686.400 NUCT = 599.700 CPHI = 13.682 NRAT = .908 DEPT = 9807.500 GRCH = 37.100 FUCT = 257.800 NUCT = 314.000 CPHI = 30.460 NRAT = 1.262 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.002 --- 91/12/os --- 1024 --- COMCEN.003 ****************************************************************************** FILE HEADER RECORD .............................. TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER --- COMCEN.003 mmm 0 Page 8 DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- ~1/12/os --- 1024 --- LO --- COMCEN. 002 ****************************************************************************** COMMENT RECORD .................................. TYPE 232 FILE HEADER FILE NUMBER= 03 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER= 03 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH mmmmm--mmmmmmm mmmmmmmmmmm CNSG 10711.5 9784.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 01 BASELINE DEPTH ......... EQUIVALENT UNSHIFTED DEPTH CNSG mmmmmmm NO NPHI CURVE PRESENTED DUE TO INABILITY TO RECOMPUTE AT THIS TIME. CPHI PRESENTED WITH THE FOLOWING PARAMETERS: BIT SIZE: 8.500" CASING SIZE: 7.000" CASING WT.: 26.0005 PUMPED 440 BBLS PRIOR TO PASS $3. WELL ON VACUUM. LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS= TYPE SIZE REPR. CODE ENTRY i i 66 0 2 i 66 0 3 2 79 24 4 i 66 1 5 i 66 ~ 8 4 73 60 Page ~9 9 4 65 .lIN 11 2 79 42 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 i 66 1 0 i 66 0 DATUM SPECIFICATION BLOCKS= MNEM SERVID SERVICE# UNITS API CODE FILES SIZE ~SAMP REPR. DEPT F 00000000 0 4 I 68 GRCH CNSG 666182 GAPI 00000000 0 4 i 68 FUCT CNSG 666182 CPS 00000000 0 4 I 68 NUCT CNSG 666182 CPS 00000000 0 4 I 68 CPHI CNSG 666182 PU-S 00000000 0 4 i 68 NRAT CNSG 666182 00000000 0 4 i 68 ****************************************************************************** DATA RECORD TYPE 0 DEPT = 10711.500 GRCH = 51.100 FUCT = 474.600 NUCT = 471.400 CPHI = 19.830 NRAT = 1.033 DEPT = 10611.500 GRCH = 47.700 FUCT = 435.700 NUCT = 465.200 CPHI = 24.220 NRAT = 1.098 DEPT = 10511.500 GRCH = 22.400 FUCT = 519.700 NUcT = 522.500 CPHI = 18.879 NRAT = 1.036 DEPT = 10411.500 GRCH = 50.400 FUCT = 573.100 NUCT = 558.400 CPHI = 20.200 NRAT = 1.017 DEPT = 10311.500 GRCH = 20.100 FUCT = 658.500 NUCT = 602.700 CPHI = 15.329 NRAT = .948 DEPT = 10211.500 GRCH = 24.700 FUCT = 941.500 NUCT = 760.100 CPHI = 8.864 NRAT = .832 DEPT = 10111.500 GRCH = 75.600 FUCT = 440.400 NUCT = 475.700 CPHI = 24.770 NRAT = 1.125 DEPT = 10011.500 GRCH = 30.500 FUCT = 590.200 NUCT = 547.300 CPHI = 15.616 NRAT = .964 DEPT = 9911.500 GRCH = 35.800 FUCT = 655.100 NUCT = 581.000 CPHI = 13.736 NRAT = .919 Page 10 DEPT = 9811.500 GRCH = 42.400 FUCT = 225.200 NUCT = 304.900 CPHI = 47.700 NRAT = 1.401 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.003 --- 91/12/05 --- 1024 --- LO --- COMCEN.004 ****************************************************************************** FILE HEADER RECORD .............................. TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.004 --- 91/12/05 --- 1024 --- LO --- COMCEN.003 ****************************************************************************** COMMENT RECORD ............................... ~-- TYPE 232 FILE HEADER FILE NUMBER: 04 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. mmmmmmmmmmmmmmmmmmm Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; mmmmm~mmmmmmm arithmetic average of edited static baseline passes for all other curvem. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS mmmmmmmmmmmmm mmmmemmmmmmm CNSG $ REMARKS: 01,02,03 NO NPHI CURVE PRESENTED DUE TO INABILITY TO RECOMPUTE AT THIS TIME. CPHI PRESENTED WITH THE FOLOWING PARAMETERS: BIT SIZE: 8.500" CASING SIZE: 7.000" CASING WT.: 26.000~ LIS FORMAT DATA Page 11 DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS= TYPE SIZE REPR. CODE ENTRY I I 66 0 2 I 66 0 3 2 79 24 4 i 66 1 5 i 66 1 8 4 73 60 9 4 65 .lIN 11 2 79 42 12 4 68 -999.000 14 4 65 F 15 i 66 68 16 I 66 1 0 i 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICE~ UNITS API CODE FILE~ SIZE SSAMP REPR. DEPT F 00000000 0 4 I 68 GRCH CNAV 666182 GAPI 00000000 0 4 i 68 FUCT CNAV 666182 CPS 00000000 0 4 1 68 NUCT CNAV 666182 CPS 00000000 0 4 i 68 CPHI CNAV 666182 PU-S 00000000 0 4 I 68 NRAT CNAV 666182 00000000 0 4 i 68 ****************************************************************************** DATA RECORD TYPE 0 DEPT = 10707.500 GRCH = 45.233 FUCT = 463.933 NUCT = 468.533 CPHI = 20.372 NRAT = 1.043 DEPT = 10607.500 GRCH = 40.867 FUCT = 385.733 NUCT ~ 448.100 CPHI = 26.727 NRAT = 1.200 DEPT = 10507.500 GRCH = 28.367 FUCT = 528.167 NUCT = 521.600 CPHI = 19.269 NRAT = 1.022 DEPT = 10407.500 GRCH = 45.267 FUCT = 268.767 NUCT = 356.933 CPHI = 38.533 NRAT = 1.359 DEPT = 10307.500 GRCH = 22.267 FUCT = 638.133 NUCT = 587.867 CPHI = 15.554 NRAT = .951 DEPT = 10207.500 GRCH = 22.467 FUCT = 975.467 NUCT = 766.267 CPHI = 7.962 NRAT = .811 Page 12 DEPT = 10107.500 GRCH = 28.067 FUCT ~ 441.033 NUCT = 474.833 CPHI = 21.527 NRAT ~ 1.113 DEPT = 10007.500 GRCH = 26.733 FUCT - 621.133 NUCT = 571.933 CPHI = 15.243 NRAT ~ .951 DEPT = 9907.500 GRCH = 34.933 FUCT ~ 682.067 NUCT = 603.133 CPHI = 14.272 NRAT = .917 DEPT = 9807.500 GRCH = 36.900 FUCT = 259.300 NUCT = 319.067 CPHI = 31.033 NRAT ~ 1.275 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.004 --- 91/12/05 --- 1024 --- LO --- COMCEN.005 ****************************************************************************** FILE HEADER RECORD TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.005 --- 91/12/05 --- 1024 --- LO --- COMCEN.004 ****************************************************************************** COMMENT RECORD ........................... TYPE 232 FILE HEADER FILE NUMBER: 05 RAW CURVES Curves and log header data for each pass in separate filesl raw background pass in last file. PASS NUMBER= 01 DEPTH INCREMENT= 0.5000 FILE SUMMARY VENDOR TOOL. CODE START DEPTH STOP DEPTH CNT 10717.5 9784.0 Page 13 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) = BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 21-JUL-91 DDL1 0092-49 1535 21-JUL-91 10830.0 10695.0 9786.0 10694.0 1500.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAMMA RAY CNT COMP. NEUTRON (G) $ 3304 27002 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT)= LOGGER'S CASING DEPTH (FT): 8.500 10834.0 BOREHOLE CONDITIONS FLUID TYPE= FLUID DENSITY (LB/G}: SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM)= FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT)= GAS/OIL RATIO= CHOKE CRUDE 7.45 0.0 163.0 15000 0.0 1.000 0. 000 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY= HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 8.500 NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): 0.0 REMARKS NPHI PRESENTED WITH THE FOLOWING PARAMETERS: BIT SIZE': 8.500" CASING SIZE= 7.000" CASING WT.: 26.000# Page 14 PUMPED 346 BBLS PRIOR TO PASS ~1. WELL ON VACUUM. $ LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY 1 i 66 0 2 I 66 0 3 2 79 28 4 i 66 1 5 i 66 1 8 4 73 60 9 4 65 .lin 11 2 79 36 12 4 68 -999.000 14 4 65 F 15 1 66 68 16 1 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICE# UNITS API CODE FILES SIZE #SAMP REPR. DEPT F 00000000 0 4 i 68 GR CNT 666182 GAPI 30310010 0 4 i 68 MCCL CNT 666182 IN 86150010 0 2 1 79 RCCL CNT 666182 MV 86150010 0 2 i 79 FCNL CNT 666182 CPS 42334300 0 4 1 68 NCNL CNT 666182 CPS 42334300 0 4 i 68 .NPHI CNT 666182 % SS 00000000 0 4 1 68 NRAT CNT 666182 C/C 00000000 0 4 i 68 ****************************************************************************** DATA RECORD TYPE 0 DEPT = 10717.500 GR = RCCL = 0 FCNL = NPHI = 30.830 NRAT = DEPT = 10617.500 GR = RCCL = 29 FCNL = NPHI = 13'467 NRAT = DEPT = 10517.500 GR = RCCL = -58 FCNL = NPHI = 20.610 NRAT = .000 MCCL = 0 .000 NCNL = .000 .000 37.900 MCCL = 28 852.500 NCNL = 765.000 .925 23.600 MCCL = 13 488.400 NCNL = 502.100 1.061 Page. 15 DEPT = 10417.500 GR = 28.000 MCCL ~ 35 RCCL = -48 FCNL = 519.000 NCNL = 521.300 NPHI = 20.440 NRAT = 1.036 DEPT ~ 10317.500 GR = 30.800 MCCL = 70 RCCL = 0 FCNL = 624.900 NCNL = 577.400 NPHI = 15'020 NRAT = .955 DEPT = 10217.500 GR = 27.500 MCCL ~ 31 RCCL ~ 29 FCNL = 873.200 NCNL = 711.600 NPHI ~ 9.886 NRAT = .843 DEPT = 10117.500 GR = 78.200 MCCL = 56 RCCL = -19 FCNL = 392.500 NCNL = 444.400 NPHI = 26.840 NRAT = 1.168 DEPT = 10017.500 GR = 24.200 MCCL = 20 RCCL = 9 FCNL = 649.700 NCNL = 588.700 NPHI = 15.669 NRAT = .939 DEPT = 9917.500 GR = 30.300 MCCL = 74 RCCL = 19 FCNL = 600.600 NCNL = 563.800 NPHI = 16.220 NRAT = .972 DEPT = 9817.500 GR = 43.400 MCCL = 35 RCCL = 322 FCNL = 235.400 NCNL = 307.200 NPHI = 37.690 NRAT = 1.346 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF OENERATION MAX.' PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- COMCEN.O05 m~ 0 --- 91/12/05 --- 1024 --- COMCEN.O06 ****************************************************************************** FILE HEADER RECORD TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.O06 --- 91/12/05 --- 1024 --- COMCEN.005 page 16 COMMENT RECORD .................................. TYPE 232 FILE HEADER FILE NUMBER= 06 RAW CURVES Curves and iog header data for each pass in separate files; raw background pass in last file. PASS NUMBER= 02 DEPTH INCREMENT= 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CNT 10718.0 $ LOG HEADER DATA DATE LOGGED= SOFTWARE VERSION= TIME LOGGER ON BOTTOM= TD DRILLER (FT)= ~ TD LO~GER (FT)= TOP LOG INTERVAL (FT)= BOTTOM LOG INTERVAL (FT)= LOGGING SPEED (FPHR)= DEPTH CONTROL USED (YES/NO)= TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE mmmmmmmmmmmmmmmm mmmmmmmmm GR GAMMA RAY CNT $ 9788.5 COMP. NEUTRON (G) 21-JUL-91 DDL1 0092-49 1535 21-JUL-91 10830.0 10695.0 9786.0 10694.0 1500.0 NO TOOL NUMBER 3304 27002 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)= DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 8.500 10834.0 BOREHOLE CONDITIONS FLUID TYPE= FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF)= BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINI-TY (PPM)= FLUID LEVEL FLUID RATE AT WELLHEAD WATER CUTS (PCT): GAS/OIL RATIO= CHOKE (DEG): CRUDE 7.45 0.0 163.0 15000 0.0 1 · 000 0 · 000 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: THERMAL SANDSTONE Page 17 ~.TRIX DENSITY: HOLE CORRECTION (IN)~ 2.65 8.500 NORMALIZATION WINDOW START DEPTH STOP DEPTH (FT)= AMOUNT= GAS SCALING FACTOR FOR NEAR AND FAR COUNTS= MULTIPLIER: TOOL STANDOFF (IN)= 0.0 REMARKS= NPHI PRESENTED WITH THE FOLOWING PARAME~RS~ BIT SIZE= 8.500" CASING SIZE= 7.000" CASING WT.= 26.000S PUMPED 387 BBLS PRIOR TO PASS $2. WELL ON VACUUM. $ LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD ............... TYPE 64 ENTRY BLOCKS= TYPE SIZE REPR. CODE ENTRY I i 66 0 2 i 66 0 3 2 79 28 4 i 66 1 5 i 66 1 8 4 73 60 9 4 65 .lIN 11 2 79 36 12 4 68 -999.000 14 4 65 F 15 i 66 68 16 i 66 1 0 1 66 0 DATUM SPECIFICATION BLOCKS: MNEM SERVID SERVICES UNITS API CODE FILES SIZE SSAMP REPR. DEPT F 00000000 0 4 I 68 GR CNT 666182 GAPI 30310010 0 4 i 68 MCCL CNT 666182 IN 86150010 0 2 i 79 RCCL CNT 666182 MV 86150010 0 2 I 79 FCNL CNT 666182 CPS 42334300 0 4 i 68 NCNL CNT 666182 CPS 42334300 0 4 i 68 NPHI CNT 666182 % SS 00000000 0 4 i 68 NRAT CNT 666182 C/C 00000000 0 4 I 68 ****************************************************************************** DATA RECORD TYPE 0 Page 18 DEPT = 10718. 000 GR = .000 MCCL = 0 RCCL = 0 FCNL = .000 NCNL = .000 NPHI = 28.120 NRAT = .000 DEPT = 10618.000 GR = 37.400 MCCL = 41 RCCL = -439 FCNL = 840.100 NCNL = 770.600 NPHI = 15.435 NRAT = .950 DEPT = 10518.000 GR = 24.100 MCCL = 33 RCCL = 9 FCNL = 495.300 NCNL = 513.700 NPHI = 21.580 NRAT = 1.070 DEPT = 10418.000 GR = 28.900 MCCL = 29 RCCL = -39 FCNL = 538.400 NCNL = 536.800 NPHI = 20.440 NRAT = 1.031 DEPT = 10318.000 GR = 26.000 MCCL = 44 RCCL = -29 FCNL = 620.600 . NCNL = 576.400 NPHI = 16.305 NRAT = .964 DEPT = 10218.000 GR = 26.700 MCCL = 16 RCCL = -9 FCNL = 860.300 NCNL = 710.000 NPHI = 9.995 NRAT = .851 DEPT = 10118.000 GR = 80.700 MCCL = 33 RCCL = -58 FCNL = 402.800 NCNL = 440.100 NPHI = 25.620 NRAT = 1.133 DEPT = 10018.000 GR = 25.800 MCCL = 31 RCCL = 29 FCNL = 663.100 NCNL = 596.900 NPHI = 14.849 NRAT = .930 DEPT = 9918.000 GR = 33.400 MCCL = 28 RCCL = -9 FCNL = 600.200 NCNL = 556.600 NPHI = 15.190 NRAT = .957 DEPT = 9818.000 GR = 54.300 MCCL = 283 RCCL = 214 FCNL = 236.900 NCNL = 306.800 NPHI = 34.780 NRAT = 1.337 ****************************************************************************** FILE TRAILER RECORD .............................. TYPE 129 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER --- COMCEN.006 ~---- 0 Page 19 DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL NEXT FILE NAME --- 91/12/o5 --- 1024 --- COMCEN. 007 ****************************************************************************** FILE HEADER RECORD .............................. TYPE 128 FILE NAME SERVICE SUB LEVEL NAME VERSION NUMBER DATE OF GENERATION MAX. PHYSICAL RECORD LENGTH FILE TYPE OPTIONAL PREVIOUS FILE NAME --- COMCEN.007 m~ O --- 9i/i2/05 --- 1024 ~m~ LO --- COMCEN.006 ****************************************************************************** COMMENT RECORD .................................. TYPE 232 FILE HEADER FILE NUMBER= 07 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER= 03 DEPTH INCREMENT= 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CNT 10720.5 $ LOG READER DATA DATE LOGGED: SOFTWAREVERSION= TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER TOP LOG INTERVAL (FT)= BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR)= DEPTH CONTROL USED (YES/NO)= 9783.0 21-JUL-91 DDL1 0092-49 1535 21-JUL-91 10830.0 10695.0 9786.0 10694.0 1500.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAMMA RAY CNT COMP. NEUTRON (G) $ 3304 27002 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)= DRILLER'S CASING DEPTH (FT): 8.500 10834.0 Page 20 LOGGER'S CASING DEPTH (PT): BOREHOLE CONDITIONS FLUID TYPE= FLUID DENSITY (LB/G)= SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY FLUID LEVEL (FT): FLUID RATE AT WELLI~EAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE 7.45 0.0 163.0 15000 0.0 1 · 000 0. 000 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX= MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 8.500 NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT)= AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS= MULTIPLIER: TOOL STANDOFF (IN): 0.0 REMARKS: NPHI PRESENTED WITH THE FOLOWING PARAMETERS: BIT SIZE: 8.500' CASING SIZE= 7.000" CASING WT.: 26.0005 PUMPED 440 BBLS PRIOR TO PASS $3. WELL ON VACUUM. $ LIS FORMAT DATA ****************************************************************************** DATUM FORMAT SPECIFICATION RECORD TYPE 64 ENTRY BLOCKS: TYPE SIZE REPR. CODE ENTRY i I 66 0 2 I 66 0 3 2 79 28 4 i 66 1 5 I 66 1 8 4 73 60 9 4 65 .lIN 11 2 79 36 12 4 68 -999.000 14 4 65 F 15 i 66 68 Page 21 16 i 66 1 0 I 66 0 DATUM SPECIFICATION BLOCKS= MNEM SERVID SERVICES ONITS API CODE FILES SIZE SSAMP REPR. DEPT F 00000000 0 4 i 68 GR ~TT 666182 GAPI 30310010 0 4 i 68 MCCL CNT 666182 IN 86150010 0 2 i 79 RCCL CNT 666182 MV 86150010 0 2 i 79 FCNL CNT 666182 CPS 42334300 0 4 i 68 NCNL CNT 666182 CPS 42334300 0 4 i 68 NPHI CNT 666182 % SS 00000000 0 4 i 68 NRAT CNT 666182 C/C 00000000 0 4 I 68 ****************************************************************************** DATA RECORD TYPE 0 DEPT = 10720.500 GR = .000 MCCL = 0 RCCL ~ 0 FCNL = .000 NCNL = .000 NPHI = 29.690 NRAT = .000 DEPT = 10620.500 GR = 83.300 MCCL = 69 RCCL = 107 FCNL = 896.700 NCNL = 796.200 NPHI = 14.251 NRAT = .919 DEPT = 10520.500 GR = 24.700 MCCL = 18 RCCL = -9 FCNL = 495.900 NCNL = 514.000 NPHI = 21.580 NRAT = 1.065 DEPT = 10420.500 GR ~ 24.800 MCCL ~ 22 RCCL ~ -19 FCNL = 628.400 NCNL = 600.600 NPHI = 17.286 NRAT = .991 DEPT ~ 10320.500 GR = 27.200 MCCL ~ 26 RCCL = 19 FCNL = 651.000 NCNL = 592.600 NPHI = 15.180 NRAT = .939 DEPT ~ 10220.500 GR = 33.200 MCCL = 18 RCCL ~ 0 FCNL = 870.300 NCNL ~ 711.400 NPHI = 10.105 NRAT = .844 DEPT = 10120.500 GR = 52.400 MCCL = 25 RCCL = 9 FCNL = 429.300 NCNL = 470.000 NPHI = 23.870 NRAT = 1.126 DEPT = 10020.500 GR = 24.700 MCCL = 20 RCCL = -165 FCNL = 690.800 NCNL = 605.400 NPHI = 13.242 NRAT = .906 Page 22 DEPT = 9920'500 GR = 32.400 HCCL = 77 RCCL = 19 FCNL = 613.200 NCNL = 566.000 NPHI = 15.403 NI~T = ,955 DEPT = 9820.500 GR = 72.800 HCCL = 74 RCCL = 39 FCNL = 232.500 NCNL = 300.800 NPHI = 42.100 NRAT = 1.348 FILE N~ SERVICE SUB LEVEL NAHE VERSION NUHBER DATE OF GENEI~TION I,~,.X. PHYSI~ RECORD LENGTH FILE TYPE OPTION~ NEXT FILE NJ~E --- COMCEN. 007 ~mm O --- 91/12/05 --- 1024 --- LO ****************************************************************************** TAPE TRAILER RECORD .............................. TYPE 131 SERVICE NAME DATE ORIGIN OF DATA TAPE NAME TAPE CONTINUATION NUMBER NEXT TAPE NAME COMMENTS= --- COMCEN --- 91/12/05 m~ 0 ****************************************************************************** REEL TRAILER RECORD .............................. TYPE 133 SERVICE NAME DATE ORIGIN OF DATA REEL NAME REEL CONTINUATION NUMBER NEXT REEL NAME COMMENTS= --- COMCEN · 91/12/05 --- 666182 ****************************************************************************** END OF TAPE ENCOUNTERED Page 23 PROGRAM: LZSCAN REVISION: 5.1 PART NUMBER: WS790-PE32 Start of execution: Tbu 2 NOV 89 2:5~p **** REEL, H~ADER LIS 89127/10 ATLAS 01 *LIS CUSTOMER FORMAT TAPE' **** TAPE ,~E&DER **** LIS 89/27/1 0 4024 01 '3 PASS CN/MS AT 10710-9S$0 FT.' =iL= ~ 1 PASS !.001 **** FILE HEADER **~* 1024 CN : ARCO ALASKA =NC WN : PRUDHOE 3AY FN : 15-17 COUN : NORTH SLOPE STAT : ALASKA , FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME' TAP$~. u~EDTH, UNTT* : FT, 12 CURVES : NAM~ ~'R N TTE TEN BYTES 4 8 LSN 6~ I CTS 4 9 CLSN 68 1 CTS z+ 10 CN 68 t PCT 4 11 CNC o8 I PCT 4 I 2 CNRA 68 1 C/C 4 * DATA RECORD DEPTH CCL CN 10710.000 0.0000000 22.60312 10650.000 1.000000 25.39236 10610.000 1.000000 28.88074 10560,000 25.00000 26.67734 105t0,000 5,00000© 17.31966 10460.000 4.000000 19.74947 10410.000 2.000000 57.45955 10350.000 0.0000000 16.75552 10310.000 0.0000000 1!.97461 10260.000 0.0000000 9.367~52 102t0.000 0,0000000 6.022736 10160.000 0.O000000 7 0~9<40 . TYPE# R SN NC 0000000 10.6113 6. 6031 2 2.80078 69.2185 9.39236 1,33870 29.2709 2.88074 7.56177 54,1653 0.67734 21,55377 300.2192 ~1.31'~60 21.36684 293.2078 23.74947 47.03041 208.4250 41.45955 24.05757 302.9~37 20.75552 17,26274 o6n 4~7~ L~ . .... !5.97-461 19,02525 335.0Z37 1= 36795 1~, 719c;4 z+76.6123 10.02274 43,96519 446,g370 11,0395~ O) 994 5YTES * TTEN CSSN CNR~ 952.46 310,61 0.89065 39 13 z, 3 E-01 1076.4 ,- ,,..., o.. 21 0.8; 2479 41 85 95 E-01 125t .7 229,27 0.75659 71 09 636-01 1193.9 254.16 0.79500 63 53 49E-01 1252.950 300.2192 0.1052133 1224,1 293.20 0.97092 37 78 99E-0! 1209.1 208.42 0.63839 63 5O 79E-01 1242.233 302.9937 0.1073012 I 301 .703 363.4873 0.1~01~4!~. , 1207.635 385,0237 .1 ~5~871 1t94.~04 476.6123 0.1746846 1269,490 446,9370 0,1644985 TEN LSN 54.11403 110.6589 -6.340036 88.&2053 9.631598 69.38618 -13.68322 81.13008 -1.539944 126,3482 -7.852232 113.8737 -15,47814 53.22324 -0.6975312 I 30.0462 23.64543 18~.1903 -10.45754 224.0639 -10.26020 333.0273 12.53949 294.0818 SPD CLSN 14.99850 27.65473 14.76270 22.20512 1~.99350 17.34656 14.9~850 20.28252 14.99850 31.58705 14.99850 28.46841 14.99850 13.30581 14.99850 32.51155 14.99850 46.54759 14,99850 56.015~9 14.99550 83.25684 14.99850 73.52048 10110. 000 58. 10329 I 1 4! · 425 -27.5485:2 14.99:!'350 10060.000 21 . .24950 2.000000 327.t692 13.13531 17.13531 10010.000 21.58069 1.000000 341.4451 13.06795 17.06795 9960.000 22.39706 O.O00000O 349.2983 12.61761 16.61761 9910 .~n -' . ,.,,~ 0 32 · 361 8 :~ 2.000000 355.8870 12.02556 16.02556 121:3.1 327.16 0.12302 1210.9 341.44 0.12335 1146.0 349.29 0.125o6 1275.6 355.88 0.12884 19' 12 26 51 89 O0 88 72 06 70 28 -8.449415 160.9949 I .015956 168.4812 -16.56790 175.5816 17.36639 183.4139 14.99550 40.24875 14.99850 42.12029 14.99850 43.89539 14.99850 45.85349 TOTAL DATA RECORDS :~ STARTING .TAPE DEPTH : 10710.00 FILE TRAILER **** ENDING TAP=~ DE PTH : 9880.00 FILE # 2 **** FILE HEADER **** PASS 2.002 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRANE TAPE,.~,mE~TH. UN~T~ : FT 12 CURVES : NAME COD 2 TTEN 68 .3 TEN 6B 4 SPD 68 5 CCL 68 6 SSN 68 7 CSSN 8 LSN 68 9 CLSN 68 10 CN 11 CNC 68 I ~ .r,N R A 6~ E SAMPLE# UNIT I API I LB I L~ I F/MM 1 VOLT I CTS I CTS I CTS 1 CTS 1 ~ ~CT 1 PCT I C/C BY 4 4 4 4 4 4 4 4 TE$ DATA DEPTH CCL CN RECORD (TYPE~ O) GR SSN 994 BYTES * TTEN ~ c.qN CNRA Tr-N LSN SPD CLSN 0.0000000 09247 10660.000 10.00000 27 09~::3 105!0.000 O.O00000O £~.47601 10550.000 0.0000000 26.t9490 10S10.000 0.0000000 18.81384 10460.000 0.0000000 20.71277 10410,000 0.0000000 37.91142 10360,000 Z.O0000O 17.11964 10310.000 3.000000 13.1680S 10260.000 4.000030 9.952129 10210.000 0.0000000 5.966701 10160,000 2.000000 6.698904 10110,000 0.0000000 21.16319 10060.000 1.000000 13.37978 10010.000 O.uuO0000 13.42140 9960,000 0.0000000 11.58154 311,~067 27,09247 49 80~78 264.5447 31.09383 51,33870 252,3456 32,47601 27.56177 !55.4!34 30.19490 21.58377 295.0894 ;!2.81384 Pl 366~4 289.9941 24.71277 47.0'3041 117.g405 41.91142 24.05757 393,2634 21.11964 17.26274 351.3359 17 165 t9,02525 383.3325 13,e5213 18.71954 477.0498 9.966761 43.9A=1o 446.1482 10.69890 5~.10329 256.5071 25. 1631o, ~1.24950 331.5620 17.37978 21.58069 345. 0972, 17.42140 22.39706 34~ g2PO 15,58154 31 t. 9067 0.$782744 1!90.627 264.5447 0.7897544 1235.788 252.3456 0.7638001 1173.2,83 255.4234 0.8078235 1191.600 ~95.0894 0.1000633 1!57.086 289.7941 0.'9421873 1166.226 217.8406 0.6336713 1253.576 303,2634 0,1059439 1109.486 351.3359 0.1228576 1176.751 388.3325 0.1414434 1160.036 477.0498 0.1752874 1234.522 446.1482 ,~.1677583 1136.510 256.5071 0.9293461 117¢.448 33t.5620 0.1218116 119g.468 345.0974 0.1216080 11 80. 622 348.8P_20 0.1313373 E-01 E-01 E-01 · E-01 E-01 -01 E-01 109.5758 52.89951 83.57010 11.40303 77.09659 -6.761854 82.53479 -6.600506 115.1105 -2.778552 109.2915 -13.$2260 55.21571 12.~6253 125.5157 -25.38638 172.6572 -P_.958499 219.7083 -12.83868 334.4832 8.166077 299.380~ -13.33765 95.35347 4.405727 t61 .5523 ~1111477 lO7.8665 -4.647284 183.2534 27.39397 14.34360 20.~9253 14.9~850 19.27415 14.99850 20.63370 14 998~0 29.52762 14.9e85o 27.32288 14.99850 13.~0393 14.99850 32.12892 14.99850 43.16429 14.99550 54.92708 14.99850 83.62082 14.99~50 74.84509 14.~853 23.83835 14.99850 40.38809 14.9~$50 41.96661 45.81335 9910 · 000 32 · 36183 11 66 . 0~7 -5 . 6531 77 14 . 9985 0 TOTAL DA~A~ RECO~SKu STARTING TAPE DEPTH = 10710.00 FIL~ TRAILER .-;NDING TAP:~ DE~TH = 9880.00 FILE # 3 **** FILE HEADER **** PASS 3.003 1024 FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAHE TAPE DEPTH UNiT : FT 12 CURVES : NAME CnD: qAMD I GR 68 1 Z TTEN 68 1 3 TEN 68 4 SPD 63 1 5 CCL 68 1 6 SSN 68 1 7 CSSN 68 1 8 LSN 68 1 9 CLSN 68 1 10 CN 68 1 1t CNC 68 1 12 CNRA 68 1 UNIT BYTES APZ 4 LB 4 LB 4 F/MM 4 VOLT 4 CTS 4 CTS 4 uTS 4 CTS 4 PCT 4 PCT 4 C/C 4 * DATA RECORD (TYPE# DEPTH GR CCL SSN CN CNC 10710 · ' I O. 00000:30 23.55431 10660,000 I ,000000 26.~008~ 10610.000 3.00000n 25.647~3 10¢60 One 5,00000,,9 0 00" ~*0 . OOuu =1~ ~7 46.69P~ 266,4111 30 ~008~ 42.80736 262,0598 29,64743 O) 994 8YTES * TT EN CSSN CNRA 946.7017 313.5200 0 86691 44: 1 1t42,495 266.4111 0 P077002=-0t · ~.,:,~ 11q]. .,34a 267,0598 0,3193153E-01 I I :~3 · 48.1 256.6960 0.TP40149E-01 TEN LSN 265.0249 10S.7180 32.50934 86.07213 ~.189063 a5.38353 -0.43~1 506 81 .52823 SPD CLSN 14,9o350 Z7.17950 14.23440 21.51804 1¢.9o~ 21.47096 14.99850 20.35205 O. 0000000 295.3962 _295. 3962 18.3024~ 22.3U24~ i', lu17669 I 04,~0. 000 25 . 78677 11 47.583 O. O00000O 2.94.24,07 294. 2407 19. 54375 23. 54875 O. ~771484E-01 10410.000 50.69557 1237.303 2 000~ .... - . uO0 21~ 7~62 215.7562 35.38004 39.38004 0.6618160E-01 1 0350. 000 30. 69751 11 62 . 625 I .000000 300· 0200 300. 0200 16. 887;9 20.88,739 O. 1068056 10310. 000 21 · 90013 11 93.797 O. 0000000 354 . 7085 354. 7085 I 2. 86559 1 6 · 86559 O. I 243851 I 0260. 000 19. 26379 1 I 47. 060 I . 000000 358. 0905 38,3. 0908 10. 00455 I 4. 00455 O. 1410924 10210. 000 ;23. 221 I 5 1 209 · 781 4. 000000 476. 5278 476.5278 6 145no~ 1¢- 145~9 O 17338~4 101 60. 000 51 · 34633 1130.311 0 · 0000000 447.6265 447. 6265 6. 873180 10. 87318 0. I 660724 10110.000 50.65273 1!22.312 0.0000000 264·0989 264.0989 23.32040 27.32040 0.~726329E-01 10060.000 25.42612 0.0000000 330.6279 1 3.34683 17.3,C683 112~.544 330.5279 0.1219732 10010. 000 25 · 10338 1 143 . 929 0 . 0000000 344 · 0708 344. 0708 I 3.61 864 I 7.61 864 O. 1 2065 ~3 9960. 000 24 . 05 909 1 088.313 I . 000000 348 . 6033 343. 6038 1 2. 54961 16 · 54961 O. 1 260235 9910.000 35. ~475 ?..3 1 225.914 000000 352. 5085 352. 5088 88100 1,6.8-8100 0 · 1 ~4306/-., 120.2463 -!4.45486 11 5. 0068 11.66076 57.38109 -6.581902 128.1752 1~.61511 176.4818 -8.898684 21~.0~65 17.22916 330.4880 -16.67953 2~7.3538 -14.55155 92.18460 -11 ,05259 161 .3109 -1.759545 166.0530 -26.11533 175.7291 13.13177 175.2764 30.0~155 14.99~50 28.75169 1~.99850 14.34527 14.99850 32.04382 14.90850 44.12045 14.99850 54.75665 14.99850 82.62201 14.99850 74.33841 14.99850 23.04614 14.90850 4,0.32773 14.99850 41.51326 14.9o850 43.93228 14.99550 43.$1Qll TOTAL DATA RECORDS : STARTING TAPE OEPTH = FILS TRAILER !0710.00 ENDING T~PE DEPTH : 9880.00 **** TAPE LIS 89127/10 4024 01 TRAILER **** TOTAL RECORDS IN THiS LOGICAL Time : 277 **** REEL TRAILER LiS 8'9127110 ATLAS 01 TOTAL RECOR~¢~..~ IN TwISt, LOGICAL Rc~l~.,~_ : 278.,, TOTAL RECORDS IN THIS PHYSICA. L REEL: 278 End o~ execution: Thu 2 NOV 89 2:54p Elapsed execution tim~ = I minute , 26.0 seconds. SYSTEM R~TURN~ CODE = -O LIS TAPE VERiFICaTION LISTING RECEIVED D~ C - $ 1986 Alaska Oil & Gas Cons. ,.,U is AnChorage FO 010.HO2 VERIFICATION LISTING PAGE 1 :RViCE NAM= ~TE :86/1!/25 :EL NAM: "30~42~' ~NTZNUITZ~N ~ :01 ~EVIOUS REEL : ]MMENTS :LZSRAEy TAPE TAPE HE~DER .~.,~ :RVICE N~ME :EDIT 1TE :85/11/25 ~IGiN :FS1A ~PE NAME : ]NTZNUATION ~ :01 ~EVIOUS TAPE : :MMENTS : LZBR,a, RY TAP~ ;-' FILE MF:~,OER_ ;:.'.,. [LE NAtq~ ':EDIT .00t ~RVICE N~ME : :RSION · : ~TE : IXIMUM LENGTH : 102~ [LE TYPE : ~EVIOUS FILE : ~:-' INFORMATION iqECOROS N,:M CDNTENTS UNiT TYPE CATE SiZE CSDE N : ~RC~ .aLASKa, INC. 000 OCO Olf 05: ~'~ : D.S. 15-17 JO0 000 010 065 N : PRU~'~E ~Y 0GO O00 012 065 ~NG: 14f 000 0~3'3 004 055 OWN: lin 2. S0 000 003 065 ECi: 22 OOO 000 002 065 SU~' N ~pT~ 5L2~p ~= ' '- .... OOO OOO 012 065 T~T: ~LaSKa 000 OOO 005 065 TqY: OS~ 000 033 OO~ 055 NE'.! C3NTSNTS UNiT TYP= C~7'f Si.Z5 CC9~ R-iS ~i~ C DB NUMBER AT ACC: 7207~ jN ~THREE~ DATE LGGG~D: i7 NOV 85 DP: T HALSTEAS ~31NG ~SiNG ~SiNG ~SiNG FLUID = 13.375" SURFACE TO 2499.0 = 9.625" SURFACE TO 9535.0 : 7.000" SU~F~C~ TO 1083~+.0 = 4.500" SIJRF~CE TS 9520.0 = PRODUCED FLUIDS /P OIO.M02 VERI~ICaTiCN LiSTiNG PAG~ 3 ::: SCHLU~qSERG~R LOGS INCLUDED WITH THIS ~'!~GNETiC TAP=: -~ COHP*=NSATED NEUTRON LOG- CASteD HB.L (CNL 3 PASSES) := OATA FORMAT RECOR~ ~TRY BLOCKS TYPE SIZE REPR COD5 ~NTRY 2 1 66 0 4 i 66 I 8 4 73 80 ~ 4 65 .lin 16 1 66 i ITUM SPECiPICATISN 8LSCKS qEM SmRVIC=. ~ SERVICE UNIT APT_ API Am=~ ~ AP! =iLE, SiZ~ SPL REPR ID ORDER ~ LOG TYPE CLASS EPT FT O0 000 O0 R PS! G~P! O0 310 O1 ~Hi PSl ~d 03 890 O0 R,~T PSi O0 420 gl NRA PSi O0 OOO CO CNL PSi C2,S, O0 330 31 CNL PS1 CPS 05 ~3,~ 30 PROCESS C8DE (OCTAL) ! 68 O00000OO000000 I 68 go000000000000 i 68 OCO000OO000000 1 6~ O000OO00000000 1 68 00000000000000 I 68 00000000000000 i ~8 00000000000000 ~P OlO..H02 VER~ZCATZ~N LiSTZNG P&GE 4 ~HZ PS2 PU O0 ~AT PS2 O0 ~RA PS£ O0 'NL PS£ CPS O0 'NL PS2 CPS ~ PS3 G~Pi 00 ~HI PS3 PU iRA PS3 O0 ~NL ?S3 CPS 'NL PS3 CPS 310 Oi O 0 890 O0 0 O 420 Ol O 0 000 gO 0 0 330 31 O 0 330 30 0 0 310 Ol 0 0 890 O0 3 0 420 O1 0 0 300 O0 0 0 330 31 0 0 330 30 0 0 !PT ~RA )Hi :NL 10806,5000 GR 3.0156 NCNL -999,2500 NRAT -999.2500 GR -999.2500 NCNL 35 2022 -999 -999 -999 .:PT ~RA 10800.0000 GR 2,8867 NCNL -999,2500 NR~T -999,2500 GR -999,2500 NCNL 3 2.06 - 9 '9 -99 -99 . ~PT >HI 10700.O00J GR 2,5391 NCNL 19.1895 NRAT 998.5000 GR 2,7500 NCNL 34 2526 2 37 2512 _--PT '~R A PHI ZNL NRA 10600,0000 GR 2.9492 NCNL 25,1953 838,5000 2,72, ! 3 N C 18 2~92 2 Z2 2432 EPT NRA PHi CNL NRA 10500.0000 Gq 2.7461 N'CNL 21,9233 NR,6T 878.0000 GR 2.8~09 NCNL 245 6 .254 6. 2. O. 4. =PT NR ~ PHI CNL NRA 10400,3000 :$~S- 3.257~ NCF~L 31.5~05 NqAT 622,500~ g:( 3.1582 NCNL 218 . O. 3. 8. 2. EPT 10300.0000 SR !.92'~7 NCNL '3654. S750 2500 2500 2500 8750 0000 250O 250O 2500 2500 0000 4316 3438 0000 3906 0000 7~52 593~ 0000 3750 5055 8~37 3000 2187 1387 0025 0000 c~ O0 NPHI FCNL RNR& N P f"4 I FCNL NPHI FCNL RNR& NPHI FCNL NPHI ~NL RNRA FCNL NPHi :CNL RNR~ NPHI ~CNL FC NL N$HI FCNL RNR~ NP~Z FCNL NP~i :CNL 25. 670. -9:99. -999. -999. 713. -999. -999. -999. 15. 1034. 2. 19. 949. 23. 844. 2. 23. 874. .2 !, 594. 2, 22, 883, 28. 509. 3. 2~. 659. 1! 1293, 230 000 5OO 5OO 50O 117 000 5O0 5O0 5O0 501 000 348 :~18 000 770 375 445 332 000 703 3OO 574 297 551 30O ~16 I 58 JO000000000000 1 6~ 00000000000000 I 68 00000000000000 ! 68 00000000000000 1 68 00000000000000 i 65 O0000000OO0000 I 68 00000000000000 1 6:8 00000000000000 I 68 00000000000000 1 58 O0000OO0000000 I 68 00000000000000 i 68 00000000000000 NRAT 2,7461 GR -999,2500 NCNL -999,2500 NR~T -999,2500 NRAT 2,4570 -GR 35,2187 NCNL 2~32.0000 NRAT 2,4238 NR~T 2,7129 GR 16.2344 NCNL 2464,0000 NR~T 2,6719 NRAT 2.5820 JR 62,2187 NCNL 2416,0000 NR~T 2.6133 NR$T 2.9863 SR 54.5000 NCNL 2136.0000 NR~T 2.9902 NRAT 1.8516 GR 23,3281 NRAT .2,8359 GR -999.2500 NCNL -999.2500 NR~T -999.2500 FP OIO,H02 VERiFICATiON LISTING PAGE 3 PHI I1.425.~ NRAT 'NL 1723,0000 GR qRA 1,9160 NC.NL 10200,0C. 00 GR I. 2971 NCNL 4.3457 NR.AT 3548.0000 GR 1.3770 NCNL 10103,0000 GR 2,4363 NCNL 14,9902 NRAT '1147,0000 GR 2,4453 NCNL :-PT 10000.0300 GR ~RA 1.9717 NCNL DH I 11.62 t I NR.A T :NL 1529,0000 GR iRA 2,0078 NCNL :.PT 9988,5000 GR ~ RA. - 9'99, £500 NCNL ~HI -999,2500 NRAT 3NL -999.2500 GR IRA 1.9941 NCNL I..8711 .gO. 4375 NPHi 33'95.0000 fCNL 25,6875 NPHZ 2755,0000 FCNL 2,1~06 RNRA 24,8750 NPHI 2600. 0000 FCNL 17.5525 NPHZ 3~44.0000 FCNL 1.8857 RNRA 18.7969 NPH'I 3334.0000 FCNL -999.2500 NPHI -999.2500 FCNL -999.2500 RNRA 24.2556 NPHi 2732,0000 FCNL 2.0137 10.5459 1772.0000 4.0527 3844.0000 1.4102 4.5387 3584.0000 16.7480 1108.0000 2.2363 16.9434 1063.0000 i0.9363 1746.0300 2.0371 11.4258 1659.0000 -999,2500 -999,2500 -999,2500 11.5723 1370,0000 N~..NL NRAT N~AT GR NCNL NRAT NRAT G~ NCNL NRAT NRAT NCNL NRAT NRAT GR NCNL NRAT 1.$008 1.2197 15.5156 50O4.OOO0 1.2734 2.2637 24.6405 Z566.0000 2.2793 1.8369 16.6094 3320.0000 1.8691 -999.2500 -999.2500 -999.2500 1.8818 FILE T~AiLE~ ILE NAME :EDIT .001 fRVICE NAME : ERSION ~ : &T~ : ~XiMUM LENGTH · !02~ iLE TYPE : EXT FiLE NAME : :k :-ILE HEA.3FR-..'-"'.,. iLE NAME :EDIT .002 ERVZCE NAME : ERSION ~ : ATE : ~XiMUM LENGTH : 1024 ILE TYPE : REViGUS miLE : NTRY ~,LSCK S ]P OIO.H02 VERTFICAT'~N~ .. LiSTiNG °AGE ~5 ~TUM SPECIFiCATiGN ~EM SERVICE S~RViCE ID DRDER ~ -'PT $L PS1 ]L PS2 ; L PS3 ,~ ! 66 8 4 73 18 1 66 0 i 5,5 B L 0 C K S UN IT F'T LQG O0 O0 O0 O0 AP1 ~Pt &PI FILE TYPE CLASS MOD NO. 000 O0 0 0 150 O1 0 0 150 O1 0 0 150 O1 O 0 .lin I 10 SiZE SPL REPR CODE i 68 I 68 i 68 1 68 PROCESS (OCTAL) 00000000000000 00000000000000 00000000000000 00000000000000 ~ DATA *~ ~PT 10806.9160 CCL EPT 10800.2500 CCL EPT 10700.2500 CCL EDT 10600.2500 CCL EPT 10500.2500 CCL EPT 10400.2500 CCL ~PT 10300.2500 CCL EPT 10200.2500 CCL EPT 10100.2500 CCL EPT 10000.2500 CCL EPT 9938.5000 CCL 0.0029 CCL 0.0029 CCL 0.0293 CCL -0.004~ CCL -0.0'586 CCL -O.OIi7 CCL -0.0029 CCL -0.0i17 CCL O.OOZ9 CCL -0.00~3 CCL -999.2500 CCL -999.2500 CCL -999.2500 CCL 0.0~i0 CCL 0.0161 CCL 0.0483 CCL -0..0205 CCL 0.0571 CCL 0.0103 CCL 0.0029 CCL -0.0103 CCL -999.2500 CCL -999.2500 -999.2500 -0.0059 0.0249 0.0630 0.00~4 0.0220 -0.0015 -0.0029 0.0000 0.0381 ~ FILE TRAILER ILE NAME :~DiT ERViCE NAME : ERSION m : ATE : AXiMUM L~NGTH : ILE TYPE : :XT r~L: NAME : .00£ 102~ ~;~ T,~P~Z TR~IL:R~ -,--,- ERViCE N&>IE :SDiT ~P OIO.H02 VERIFICATION ~!STiNG ~AGF 7 :86/11/25 ~IGiN :F$1A NAM~_ : )NTINUATION ~ :01 )MM~NTS :LiBRaRY T~PE ~ R~EL TRAILER :RViCE NAM5 :EOiT ~TE :86/11/25 IiGiN : !EL NAME :302425~ )NTINUATIDN ~ :01 ~XT REEL NAME : )MMENTS :LIBRARY TAPE LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO ALASKA~.. INC. Well D.S. 15-17 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date 11/16/85 Curve Name (Abbrev.) Standard CUrve Name Logs Used Scale CN 1 COMPENSATED NEUTRON PASS i C~/MS 60 - 0 CN 2 COMPENSATED NEUTRON PASS 2 " " CN 3 'COMPENSATED NEUTRON PASS 3 " " I! !! '. COMPENSATED NEUTRON 3 PASS AVG. , 0 - 100 GR CNAV CUt:LVE S~ECiFICAT!ON$ Co=¢any Councy, AR. CO A!~_~kz. !nc. - I D.S. 15-17 ' : l~rudho · Bay 15~ ~' %~'~''-~' (Ahbrev.) 'Sca~dar~ Cu~,e Name Logs Used Scale ECC,~ 3219 Dace 11 ~29/87 DATE 12117~87 ** REEL HEADER ** REEL NAM= : DATE : ............. CR'rGiN~, : FSYS SERVICr- NAME: BITLIS REEL CCNTINU/~TtOE NUMBF-R: 01 PREVIOUS RF-EL NA~E : COMMENTS: DRESSE2 ATLAS LIS CUSTCMER T;&PE --- CRE,&TED BY SDS PROC-RAM R 2.C LENGTH: 132 BYTES .:i:..,:-:... ** T~FE HEADER T,.qO~- NAME : D~TE : ...... '" uR TN : FSYS SERVIC= N~,~'!E: P~S.S 1 T~PE CONTINU~T:O:.N NUM.55R: ;REViCus Ta~E ~&~5 : COMMENTS: LENGTH: lq2 ~YTES ~* FiLE .~EACER -~ I ** FiLE NAME: maSS 1.~01 SERVIC=. N;i¢4=: VZ-R~ICN~ ~ : t C~TS: ~5/1!/2C ~.~X R~O~D L:NGT~: 1C7~ ~VT=~ ~ZLE Typ~: LC ?~ViOUS ~iLE k~r~E: . ** INmOR~TiCN [f~ORDS ~* ** ~ORM~T *~ UNITS ENTRY ]LCCK. S TYPE ENTRv ~ 1 ~EPT'MS OECRE~SE 9 .lIN mR~'E SPACING UEITS 11 19 N~UM ~R~MES/R~CORC 0 TE~FINSTOR -0.500 L~E.L SPaCiNG DATUM Sm:CI=iCAiICN ~' OrK¢ CURVE REaR NAME CODE SlZf S~MPLE LNITS IlII IIII lIIII! LSN 68 4 1 CPS CUP. V~ NS ~_= CLSN · ~ CODE SIZE SAMPLE UNITS IIII. IlII II--II ~8 4 I CPS :: Z :4-. :~.' GR 68 4 I APi CCL 65 · CCL1 68 4 I TTEN 68 ., TEN 68 4 I .LBF SPD 68 CN 68 4 I % CNC ~8 ** FORMAT ** . 4 4 4 1 DIM 1 LBF 1 F/MN 1 % ENTRY BLOCKS TYPE ENTRY DESCRIPTION - 4 I D EP~'~S D=CREASE 8 6m,~ . 0 r-~,~,l~E~ Sm~ING~ . 9 .lin ~RA~: SPACING U~iTS 11 t9 M.~XZMdM =R~MES/R:CCR$ ~ T :R~Z~-' ,~ T~ -~, 50~ L:V~L S$~CZNS DATUM SPmCIFiraTiON_ ~.. ~LCrKq_· . . ~URVE NA~E CODa SIZE SAMPLE LNITS LSN 5~ 4 I C~S SSN 6~ ~ I CPS GR 68 c 1 T E N 6,3 4 1 L ~; C N 6, ~ 4 t CgRVE NaME CLSN CSSN CCL TTEN ~NC CCZ:E 6~ SIZ~ UNITS C~$ C~S DIM L.~F F/;'4N DEPTH 1376&,CC~ :T 3250.~7~C M LSN 52.9o5 CLSN SR v~ 311 TF_N 179.9~2 I $. 2,',- ,$ r~,CCO C ,O0C EEPTM 107Ce r.-n FT 3261 '~,~7" .-v: LSN g3,4'~5 CLSN GR 39,949 CCL TEN 110,395 SFD 20,352 O.COC S SN CCL1 CN S SN rC'" CN 1~2.g~4 C.CCC 15.CCC 25~.5C9 C.OCO 24.4~5 TT:N CNC CSSN TTEN CNC 162.9°4 19.'.30C 2c~,~50 -5790.845 2E,495 DEPTH 10~0~ CC~ - v FT =23U ~P6r ~ 27.~3~ LSN 78,819 CLSN GR 68,!~6 CCL TEN -34,66g SmD D._=PTH 104on 0 FT 15.4~9 O.CCC ~7.194 31 69.927C M LSN 01 ~: GR 5~.C5C TEN -17.g53 DEPTH 10300,CC0 ~T CLSN CCL 2? .~1 31 39.446C M S SN C": L1 ~ N SSN CCL1 CN SSN CrLI~ CN !37.5~5 24C.1~1 C. ,DC,~ ~ 29.13g 272· 3=1~ C ,OCt 29 .a25 C N r CSSN TTEN CNC CSSh TT:-N CNC _~3z.5~4 51.757 224.915 -3734.~64 3~.13~ ~29,~57 -3290.634 .:".i G R DE 23.366 CCL 0.000 CCL1 0.00(2, TTEN N -9.914 SPD 27,394 CN 13.033 CNC PTH I 0200. CCO FT 31 08. 966(] H " LSN 312.708 CLSN 86.696 SSN 474,252 CSSN GR 17.98.B CCL O.O00 CCL1 C.OCC TTEN TEN -41 .2~2 SPD 27.417 CN 5.259 CNC sSN 297.~,E7 CSSN CCL1 C.OCC TTEN aN 17.797 CNC LSN 1!g.535- CLSN C,R 19.35!] CCL 3'?. 226 D M E~T~ 9-~0~.CC~ FT '~'-'t7 52'~''' LSN 56.5!4 CLSN GR 142.37; CCL TEN -la;. c;77 15.000 27.757 SSN 2C1 .~59 CSSN CCL1 C,OCC TTEN CN 31 .756 CNC CE.~TH ,c~C -- --Il--I-- Ii, L SN ~ TEN -1 ! .'9S? C L S t',, 1 ;5~, C~' 3.4St. SF~ 1! C .CCO :2 ~'-. 2.-:2 SSN 175.551 CSSN CCL! C .9C'S ,,N 3~ :',1~' CNC .,3 F- P T H 977Z.5CS =T 297~.6~C 13.50g 27.9o7 SSN ;_CC..c, ~C CSSk CCL1 C.OCC TTEN CN 32.791 CNC S T,c., '.a, T "r N G. ,,.. DEOTH. l :t~0754 . uu'" '" 3 ~T. q2a. g . ,.,~74, n,..., fq Ef'..IDiN~.,. * .3:PTH = 0772. .,. ~..,:?,P :T 2'97,5. .... ,. ,,, ~'/" ,~ '" ~4 -3448.452 17.033 483.868 -3802.280 9.259 280.427 -3773.151 21.797 324.LE:C -375; ,~61 16.9¢7 217. ,351 -~e1~.~1= 35.756 17c.947 -3723.~5Z 40.51~ 200. 3a. TP1 *~ FILE TR.aiLER ~* :ZLE NAME: maSS 1.~':0~ SERVICE NAM:: VERSION ~ : 1 ~TE: ~-5/11/ =ZLE TYP:: LC NEXT FZLE N~'~E: ** FILE ~,EADER ~ 2 ** FILm NAME: SERVICE NA."'I=: VERSION # : DATE: &5/11/20 MAX RECO2D LENGT~- ,~IL~ TYP~: LC PREVIOUS F~LE N~E: ** INFORMATION RSCOROS ** 5YTES APIN : 500292~126 CN : ~RC~ ALaSKa, WN : 0.S. 15-17 FN : PRUCE05-BAY COUN : NORTH SLOPE STAT : ALASKA LCC : I 50'. 00 INC · ** FORMAT ** 5NTRY BLOCKS TYPE ENTRY ,2' E$C R'i PT ! ON 4 1 ~EP~HS DECReaSE ~ 6'.~ ~NE S~CING 9 .lin FD'-~E S=~CIN.S U~ITS 11 19 ...... uAXiMUk~ mRAM~S/PEC~- -~.~SO L~VE' ~CI ~ATUM~ SD-CiFIC~TiCN. ~ ~L~ru~K~ CiJ~VE N~M5 CO~ SISE ~ .... L~N ~ ~ 1 SSN ~E ~ I CPS GR 6~ 4 1 c'~L1 ~ & 1 TEN 56 ~ 1 L 5~ C N ~ ~ & 1 ** FO2MAT CURVE N~E CLSN CSSN CCL TT=N SDC C NC II~ S~MDLE 1 1 1 1 1 1 UM!TS C~S CPS L?~ F / "', ,N ENTRY BLOCKS TYPE ~:NTDY. .. , _~ E ~,,'r R i DTi 0,,"4,..., 4 1 EEDT~S CSCRE~S:_= ."3 ,:.~'.~ F~,.~: ~r-,"'-lNG 9 .!i~' F~'~E 5:ACING UkiTS O T ~ ~F ! N$ TC R C&TUM SP=CIF'C'~TiCN ~LOCK5 ** DATA ** OEPTH 10764.CC0 ~T 3280.874C..' M CURVE N6~E CLSN CSSN CCL TTEN CNC CC£~ S~MPLE 1 1 1 1 1 1 UNITS IiIiI CPS CPS DIM LB= F/MN GR 80, TEN 176, . · . 549 CCL O' 000 882 SPD 0.000 CCL1 C.OCC CN 15.000 DEPTH 10700.CCC FT 3261.367C H LSN 93.677 CLSN I ~.633 SSN GR 52.529 CCL O.COO CCL1 TEN 97.630 SPD 2S.506 CN 25g.917 C.CCC 25.96~ TTEN CNC CSSN TTEN CNC -3793.820 19.000 24B.571 -~768.013 29.963 DEPTH 10500,CC0 FT 3Z30.885C M _. LSN 72.035: CLSN 1 3,?38 GR 20.207 CCL C.CCO TEN. SSN CCL1 CN 238.792 C.OCC 26.119 CSSN TTEN CNC 3C.!1g DEPTH 10500.CC0 ~T ]Z~,9.COEC M L S N 77. ,~ :~ ~ CL S,'~ 17. ~ ~ ' GR 7~ ~&t CCL 0 ~C~ T~N -2~.'~3~ SPD 25.621 SSN CCL1 C t,; 2~2.031 C.OCC C~SN.~ TTEN CNC ~29.57: 3C.~90 ~' i -~ i ~ . DEPTH 104:uO CCD ~T _-"1AD 92."'r M LSN "~1.4,.~3 CLSN TEN -24.91 3 S~-D I ? · CCL1 CN 27~,.512 C .GCC CSSN TT--~, CNC 223.~]2 3! .C33 LSN 1~2.1C3 CLSN GR ?.5.1 5':~ CCL TEN -:~.~2 Sm0 C. 20.L~7 C~L! 32~.21C I~.~1 TT:N CNC 16.~'~1 3~.2C1 S SN ,.. ~71.512 C.CCC 4.992 C£SN CNC -~ 53,3." S'~ 3~PTh 1010C,.£~0 ~T 307~.~?.*~C !q ~ ~N 1C:~ ';2~' C~ SN C-R 28.7~5 CCL TEN -20.2,'35 C.CSO S SN CCL1 CN 291.?C6 C ~C 19.1zE CSSN TTEN CNC 27,~.133 -~807 1 ~' Z3.13~. n F- PT h. lOC0~ CC~,~ FT 3, '~ 4 ,~:.:~ . u.* C; ,~~.~ S SN ~.~'CL1 C N CSSN TTEN C NC DEPTH o9C~q. CCO, _ . FT .,~'~17, .5p..~r..,. M.. - LSN GR TEN ~5 17~ CLSN 13'~.'~ 30., -, C"L~, -1,3.600 S~O 14.C1:=~ n 26.477 SSN CCL1 C N 21C.731 C.OCC CSSN TTEN CNC DEPTH 9~00 r~ ~T ~$7.0&6C M LSN 42.~55 CLSN GR 71.274 CCL T~N -23.273 SPO 13.737 ~.C~ 27.C21 S SN CCL1 CN 176.3¢6 C.OCC 4C.359 CSSN TTEN CNC 18~',¢ .728 -3340.413 DEPTH 9772.5CC FT I I I ! I I I I ! ! I I I I i I ii I ~.~ .; ~.. 2978.564C M " .... '" GR 29 ~6] CCL 0 000 CCL1 0 000 .~,, . .-. . ,.., . l TEN -30.~97 SPD 27.997 CN 32.621 STARTING DEPTH =10764.00-0 FT 3280.8740 M ............ ENDING D'EPTH =' 9772.'500 FT' 2c78', 6~40..., M TTEN CNC · I / '~,~ I ~ ~1/ / -3854.815 36.621 6 ** FILE TRAILER FILE NAME: mASS 2.002 SERVICE N~M~: --VERSION # : 1 DATE: 85/11/ MAXIMUM LENGTH: 1024 FILE TYPE: LC' NEXT FIL~ NAME: '*' "* FILE ~-ILE NAM=: P~£~ ~ n'~'~ S=RViCE VSRSiON ~ : 1 DATE: 85/1!/2,~ MAX R~CORg LENGTH: ~ILE TYP~: Lg PREVIOUS FiLE I C.' 2 4 S Y Tr'_ S ** INFORMATION RECORDS ENTRY TYPE ENTRY il---- I----II 4 1 9 .t !N 11 !9 -O. 50O OATUH SPECIF CURVE PE°R N~ME CODE IlII LSN SEN GR 68 CrL1 TEN 68 CN 68 . ~,LC~K S CESCRIPT!ON IC'ATiON ~LCCKS SiZE S&M.mLr- UNITS 4 1 CPS 4. 1 CPS 4 1 4 1 L~F 4 1 CURVE N~ME IIIlIi CLSN CSSN CCL TTEN CNC RE=R --Ill 6~ SIZE 4 4 S~MPLE 1 1 1 1 1 1 UNITS CPS CPS DIM L~,= F/MN ENTRY BLOCA-S - TYPE_ ENTRY . 8 6(].0 9 .lIN 11 19 0 -0.5C0 C4TUM SPECIP DESCRIPTION C EPTH:S DECREASE F R A.~, E SPACING FRAME SPACING UNITS M ~X 'iMUM FRAMES/RECORD T ER~INATO~ LEVEL SPACING ICATtON BLOCKS CURVE REDR N~ME CODE SiZE S~PLE bklTS LSN 85 ~- 1 C~S SSN 68 ~ 1 CPS CCL1 6~ ~ 1 T~N 68 4 1 LBF ~ N c 1 · , ~ CU~.VE CLSN CSSN C~ ~L TTEN S~ CNC bNZTS CPS CP~ DIM L~: m/MN OEPT~ 107a ~.,~L.:C ~T 3Pnn -- LSN 47.995 CLSN TEN 167.733 SmD 11 ..co9 rn SSN CCL1 ~N C.OCC TTEN I~.0CC CNC ~9 DEPTH 10~C IlllllIIllililllllllllll LSN gC-.C?~ CLSN GR 53.4S1 CCL TEN 7&.344 SPD p,~ C:.CCC SSN CCL1 CN 2~9.17~ CSSN C.OCC TTEN 23.97C CNC 27 DE~TH lO~n-~ OOn :T ~;~n 855C M , ~U~. '.J ~:-~.~- .... LSN 71 .1 52 CLSN G~ 22.8!7 CCL TF-N -9.97'9 SmD 17 ClP O.CCC 26.355 SSN CCL1 CN 237.0C4 CSSN C.OCC TT:N 2g.2a~ CNC 233.290 33.26~ DEPTH 10500.COO FT 32C, 0.~0~C M LSN 77, ~ I,?~ CLSN :SR ~,.r~P1 CCL TEN -la ..~21 Sp~ 17.422 G. '2 S C S CCL1 C N 24E.0~7 CSSN C.CSC TT=N 27.42E CNg DEPTH 1 i i ! ! ! ! I i I I i ! i i I LSN 95.724 GR 60.~52 TEN -25.197 3169.927C M CLSN 17.755 SSN CCL O.COO CCL1 SDC 2o.415 CN 276.06~ CSSN C.OCC TTEN 25.9~2 CNC 222.080 -3850.~J7 29.9~2 DEmTi-., 103O0.CCO FT 3139.446(] M LSN 158.955 CLSN 33.977 SSN ,GR 29.143 CCL 0.0C0 CCL1 TEN -33.~45 SP~ 26.75,~ CN 31g.£~3 CS£N C.OOC TTEN 13.634 CNC 330.~&~ -393.5.526 17.63~ DEPTH 10200.000 FT 3108.966S M !:;:~'- :': GR 17,654 CCL 0,000 CCL1 TEN -32.027 S~'D 26.724 CN · OEPTH 10100,000 FT 3078,486C M LSN 124.990 CLSN 2R..v~46 SSN GR 30,923 CCL O,CO0 CCL1 TEN -26,253 SPD 27.208 CN C,OOC TTEN 5.170 CNC 3C1.215 CSSN 0.000 TTEN 18.13C CNC D=PTH- l~"COu~.. ,CE}O FT 302,~,,.0060 M LSN 120.443 CLSN 38.030 SSN GR 26.4!7 CCL 0.000 CCL1 TEN -26.z, 51 SP2 2C.;01 CN 299.145 CSSN C.OCC TTEN 13.B7~ CNC DEr-TM ggC~. ~.,.rcc ti ]01?, ..._.-~-C N 2C2.3~e CSSN ~ OCr TTEN 2'~.~4 CNC LSN 43 .C45 CLSN I 2.073 SSN .... ~ ~'~'L C.C~'~' CCL1 TSN -~3.g:~ SPO 27.171 CN ~EPTH 9772 LSN 4~.;C5 CLSN TEN -1 5. 11.73c SSN O.CCO COL1 ~.c97 CN 170.1~C CSSN C .CCC TT[N '~'~ .~?~ CNC lg~.981 CSSN C.OCC TTEN 7E.7S2 CNC ENEING D~PTH : 9772.5C.C, FT -3858.444 9.170 280.739 -3518.209 22.130 327.034 - ~.,.9_ ?46 17.375 2C7,Cll -3574.932 32.034 -]652.C22 37.673 194,951 ~2.7~2 8 ** F?L=.,. T~ILE~. ,.. .~ mILE NAME: P:SS Z.OC$ SERVICE NfiME: VERSION ~ : ! D~TE: ~5/11/ M~XIMUM ~:NGT~:., 122L~, FiLl TYP~: LC NEXT F~LE N~ME: ~. T$O~ TRAILER ** DATE: ORIGIN C~ C~T$: ~$YS TAPE CONTINU~TIO~ ~ N~XT TAPE NAF~: COMMENTS: : 01 . ** RE=L_ TRA'LER, ** RE]L NAME: S~RVICE NAUE: el]LiS DATE : ORIGIN 0= DAT~: FSYS REEL CONTiNUATIO~ # : ~1 NEXT REEL N~E: COMMENTS: gRESSE~: AIL~S LIS c~STo~ER T~PE --- CRSAT~D BY SCS PROGRAM R 2.C , "TAPE HEAOER - 1 =ILE H~AOER - 3 INFORMATION - 3 FORMAT - 6, O-ATA .......... ]'t5 .......... TABLE DUMP - 3 FIL~ TRAIL=R - 3 TAPE TRAILER - 1 REEL TRAILER - I TOTAL RECORDS: 337 ** R~EL HEADER 8ERV]¢~ NAME :EDIT DATE ;84/07/28 ORIGIN : REEL ~A~E :REEL CONTINUATION # PREVYOU$ REEL COMMENTS {~I~RARY TAPE ** TAP~ HEADER ** 8ERV~C~ ~AME :EDIT DATE :~4/07/25 ORIG~H ~0000 TAPE NA~ 19370 ~ONTINUATfON # 101 PREVIOUS TRP~ l COMMENTS :LIBRARY ?APE .001 000 000 O0 061 OO4 065 )00 LVP OIO,HO~ VERIFICATION LISTING PAGE 2 SCHLUMBERGER ALASKA COMPUTING CENTER COMPANY = AT~ANTIC RXCHFXEhD COHPANY WELh = DRXLLSiTE 15-17 PIEbD = PRUDHOE BAY COUNTY = NORTH SLOPE BOROUGH STATE = ALASKA CASING CASING TYPE FLUID DENSITY PH FLUID LOSS = 13.37~" @ 2499' ~625 ~ 9835' - BlT SIZE = 8,5.~ TO 10850* = I~ LB/G RN = ,054 ~ 64,0 = S R~F = ,049 e 64.~ =,' RMC = .055 ~ 64v hVP 010,~0~ VgRIFICATION LISTING * SCHbUMBERGER LOGS TNCLUDED WITH THIS MAGNETIC TAPE~ * DUAL bATERLOG (Dbb~ * * BOREHObE COMPENSATED bOG_(BHC) * * LXTHO DgN&ITY COMPENSATED bOG (bDT) * , COMPENSATED NEUTRON bOG (bDT) * GAMMA RAY IN C~SING {GR,C~b) * ~ * * * * * * * * * * * * * * ~ * * * * * * * t , , , , , ENTRY BLOCK& ?¥PE-i ~SIZE~,~tL'.RE. PRCODiE ENTRY 0 0 0 ,8 l, 0 '! 68 LVP OlO,H02 VERIFICATION bISTING PAGE 4 DR PS1 GAPI 0 DT ~$2 US/F 0 OR P$~ GAP! 0 DT PS3 U$/F 0 ~R LDT GAP! 0 CALl bDT IN 0 RHO~ LD~ G/C3 0 DRMO LDT G/C3 NRAT LDT 0 ~N~A LDT 0 NPHI LDT PU 0 PEF LDT 0 NCNb LDT CPS 0 PCNL LDT C~$ 0 ~R CNb GAPI 42 31 ! 52 31 31 35 ,t4 4~. 0 32 32 32 32 32 32 3 1 0 0 2 0 92 93 32 I 68 I 68 I 68 1 68 1 68 1 68 1 68 1 68 I 68 I 68 I 68 I 6{) I 68 1 68 ** DaTR ** ,2500 0 1443 8P 999 2500 DT 99 '2500 OR -72 2500 -q99 84 ,et LVP OlO,WO~ VERIFICATION blMTING PAGE 5 DEPT 10400 GR 74 GR 79 CAbI 9 RNRA 2 FCNb 519 o000 hbD 2500 ~T ~ 4316 ~PH1 22 0000 ~R "999 DEPT OR CALI RNRA FCNb 10300 0000 hbo 26 5156 DT 24 6406 DT 8 3828 ~HOB 123~ 8428 NPHI 0000 ~R DEPT 10200 ~R 14 OR -999 RNRA ~CML 2366 000 bED 000 DT 2500 DT 48.44 RHOB ]701 NPHi 0000 gR~ DEPT 10100 0000: :LLD. FCNh 772 00.0..0. ~R 8385 LbS 0000 OR 3750 GR 6953 DRHO 9980 PEF 2500 269 6273 b~$ 101~4375 GR 100.6875 gR 1~' ~535 DR.O 156 PEP -99q~2500 8444 [,I.,8 87.50 GR 4375 GR 62:70 DRHO PEF' 1.5 47'07 LbS 99 '5625 8..g,~750 C,R ,0151 NRAT 3,3848 NCNb -~63, i250 , t'125 74, !500 2. t574 1263.0000 68 3829 SP ~ 5469 DT 1562 OR -o o132 NRAT I 7754 NCNb -53 3438 100 1 ~998 22?4 000 76,56 DT 15,9687 GR -0'0015 NRA~ 2,5605 NCNb .-41 281 999 25003 1~ 0000 2861 3242 0000 44 5344 8P -49 9062 O0 -0 2 -9' · ,9' 9' 0 RH, 9 LVP OIO,HO~ VErIFiCATION LISTING PAGE 6 RNRA ~CNb DEPT GR RNRA DEPT FCNb ~EPT GR CALl RNRA FCNb -999 2500 NPHI -999:2500 GR ~600 0000 bbD 999 2500 DT -99~ 2500 OT -99 2500 RHOB -999 O0 -999 ~5 NPHI 500 GR 9500 0000 LLD -999 2500 DT -999 2500 DT -999 2500 RHOB -999 2500 NPHI -999 2500 GE .9400 999 999 :OEPT 9300' '999,2500 PEF 65,5625 -999 2500 LbS -999 2500 OR -999 -999 -999 65 -999 -999 -999 999 2500 GR 2'500 DRHO 2500 PEF '4375 25O0 LbS 2500 GE 2500 CR 2500 DRHO 2500 PEF 8437 -999,2500 NCNb -990 -999 -999 -999 -99q 2500 SP 2500 DT 2500 GR 2500 NRAT 2500 NCNb -999 2500 SP -999 2500 DT .,999 2500 GR -999 2500 NEAT -999 ~500 NCNL 0000 ELD -999,2500 LbS -999 2500 D~ -999.2500 G:R -999 '999,2500 G.R ' .999 O.B .9~9;2500DRHO HI -999, PEt -999 2500 sp 2500 DT ,2500 NCNL -999.2500 -999 0 -999 15 0 5O0 -999 2500 -999 2500 -999 2500 -999 ~-2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 '999 25'00 -999 2500 -9:9,9 -999 -999 ,999 2.500 -¢ -999 - F 0 -9' -99! O0 PI LVP OIO,HO~ VERIFICATION LISTING PAGE 7 GE -999 2500 DT -999,2500 GR -999.2500 GE CA~ -999'.~.5oo .HO~ -999,2~00 ~HO -999,2500 .~A~ RN~A '9-99 .2500 NPHI '999;2500 PEF -999.2500 NCNL PCNb -999,2500 GE 88,81~5 OEPT eR RNRA 8800 0000 LED -999 2500 OT -999 2500 DT -999 2500 RHOB '999 2500 NPHI '999 2500 GR '999 2500 LbS -999 2500 GR -999 2500 CR -999 2500 DRHO -999 2500 PEF 1'12,2500 -990 2500 SP -999 2500 PT -999 2500 GR -999 25'00 NRAT -999 2500 NCNb DEPT GR gAL1 8700 0000 -999 2500 DT -999 2500 DT :999 ~00 RHO~ -999 25O0 -999 2500 bLS ~999 2500 CR 999 2500 GE -999 250~ DRHO -999250 PEr 76 5000 -999.2500 'ggg,2500 -999,2500 2500 NRAT .c.,, NRACN:b 8.60O 999 -999 -99:9 -999 '99:9 =999 NRA~ -999 2500 NCNb -999 2500 :999i2500 999 2500 -999 25g0 -999 25 0 -999 2500 -999 2500 -999 2500 -999 2500 -999 -999 ~500 500 -999 2500 -999 2500 -999 2500 -999 2500 -999 *,999 -999 2500 "999 2:500 -< -9' 9 -9, -9' ,8 '9 SP -( 9 -~ -9 -9, ~00 N~:Nb 500 -999 .9~ ~D 9 ,8 '9' 9 -( O0 P{ O0 ~( '~Nb 99 LVP O~O,N02 VERIFICATION LISTING PAOE 8 DgPT 8~09 GR -99 GR -999 CAbI -999 RNRA -999 PCNb -99Q 0000 bbD 2500 O? 2500 OT 500 RH00 500 NPHI 2500 GR DEPT 8000 gR -999 gR -999 CAb! -999 RNRA -999 FCNb -999 0000 2500 2500 2500 2500 2500 DEPT ?900 gR -999 GR -999 ~khi -999 RNRA '999 FCNb -999 -999,2500 bbs :999,2500 GR 999~2500 GR -999,2500 DRHO -999'2500 PEF 48,5313 -999 ,,999 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 48 8X25 LbS DRHO PElF 0000 LhD -999,2500 bbs 2~02 O~v DT -999,2500 GR DT -999,25:00 GR 2500 RHO~ -999,2500 DRHO 2500 GE ~ 3; 28!3 .¢ 5 00 DT 500,:: ~999.2500 SP .999,2500 DT 999.2500 GR -99q,2500 NRA~ -999,2500 NCN~ ~999 2500 999,2500 -999 2500 =999 2500 -999 2500 SP DT GR NRAT NCNb -999.2500 SP · ,99 500 GR -999, NCNb PEF -999 9 9! ,,9 GR 9 PE O0 2500 NCNb -999 55 -9992500 ,~999 2500 999 2500 -999 ~ O0 -999 ~00 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 25:00 -999 2500 -99925:00 -9 2500 -9 25::00 -99 -999 2500 -9' R RN NPH LVP 010,H02 VERIFICATION LISTING PAGE 9 FCNL -999,2500 ~R 40,5625 DEPT RNRA FCNb 7300 0OOO bbD -999 2500 DT -999 2500 DT -q99 2500 RHOB -999 2500 NPHI -999 2500 GR -ggg 2500 bbs ~999 2500 GR 999 2500 ~R :999 2500 DRHO 999 2500 PEF 5! 2187 =999 2500 SP -999 2500 PT -999 250O GR -99~ 2500 NRAT -99 2500 NCNb DEPT GR GE R~RA ~CNb 7200 0000 tbD -999 2500 DT 999 25 RHGB -999 2500 NPHI -999 2500 GR -999 2500 LbS -999 2500 GR 27 2031 ~999 2500 SP 999 2500 PT -999 ~.00 GR -999 ~00 NRAT -999 2500 NCNb DEPT R RNRA FCNb 7tO0 0000 LbD ~999 2500 DT 999 2500 DT :999 999 -999 2500 GR -,999 2500 blbs 2500 GR 2500 OR 32 0938 SP -999,2500 ~I '999,2500 -999,2500 -999,2500 NEAT '999,2500 NCNb 7000 0000 hbD ~999,2500 bbs -999,2500 sp ",,999 -~ 2500 DT ?999,2500 GE 99,9, -999:500 -999:500 -999 ~500 -999 !500 -999 !500 -999 -999 ~500 ~00 -999 O0 -999 2500 -999,2500 -999,2500 "999,2500 -999,2500 '999; 2500 ",9' ,$ -999 99 9 999 LYP OlO,H02 VERIFICATfON 'LISTING PAGE 10 CAL! -999,2500 RMOB RNRA -999,2500 NpHI rCNb -999,2500 ~R -999,2500 DRHO -99~,2500 PEF 16,92t9 -999,2500 NRAT =999,2500 NCNb ~99,2500 99,2500 GR CALl RNRA FCNb 6500 0000 bbD -999 2500 PT -999 2500 DT -999 500 OB -qgg ~ RH 500 NPHI -999 2500 GR -999 -999 -999 ~999 999 45 2500 LbS 2500 CR 2500 GR 2500 ORHO ,2500 PEF 4063 -999 ,2500 SP -999 ~5000 DT -999 50 GR -999 2500 NRAT -999 2500 NCNb -999 -999 -999 -999 -999 2500 2500 250O 2500 2500 DEPT eR GR RNRA rCNb ~400 o000 bbD 999 2500 DT -999 2500 D~ -999 2500 RHOB -999 250 NPHI -q99 250~ GR -999 ~999 999 -999 41 250~ 2500 CR ~$00 ~E~O 500 PE~ 250 -99~,2500 -99 .2500 DT 999, NEAT -999,2500 NCNb -999,25~0 -999.25 0 -999, 5 -q99,2500 ALI N~A rCNb 630O 0000 hbo ,7,999 25oo 999 2500 OT -999 2500 GR -999 -999 2500 8P -999 2500 DRHO -999 ,,i, 99.9 2S0,0';. PEr. : '9'99: 44 ! 562 -999 :999 999 -999 -999 2500 2500 2500 -9 ~0 9" !500 NCNb -999 .I .¢ LVP O10,H02 VERIFICATION hI$?ING PAGE GR GR CA~I FCNb -999 2500 D~ -999 2500 ~T -999 2500 RHOB -999 2500 NPH~ -999 2500 GR -999 2500 GR :99? 2500 GR ~99 :~5oo UR.O -q99 2500 PEF ¢2 28t3 OEP? CALl RNRA FCNb ~700.0000 hbo -q99,2500 bbs .999,2500 O~ -999,2500 GR 999,2500 DT -999,.2500 OR -999,2500 RHO~ -q99,2500 DRHO -999,2500 NPHI -999,2500 PEF -999,2500 GE 35,5000 DEPT OR CA~I RNRA PCNb 5600,0000 hbo :999.~ LbS -999,2500 OT -999,2500 OR -999,2500 RHOB -999,2500 DRHO -999,2500 NPH! -999,2500 PEF -999,2500 OR 3:3~68:75 R RN.RA rCNb ~500,O000bbO :999.2500 bLS .999,2500 DT .999,2500 GE :999;250:0 i:D~ :999,~500 .999,2~00 RHO~ 999,2500 DRHO 999~2500 -999 2500 O~ -999~2500 GR -999.2500 NRA~ -999~2500 NCNb -999 2500 -999 2500 .,999 2500 -999 2500 -999 2500 NCNb -999,2500 -999-;2,~00 DT :999,2500 GR 999~2500 NRA'~ -999,2500 NC:Nb -999. -999.2500 -999,2500 -999,2500 -999,2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 O0 '999 ~5 50O -999 2500 -999 2500 -999 2500 -999 2500 -999 '999 ~00 NCNb 9 -999 iO0 LVP 010,W02 VERIFICATION blSTING PAGE 12 DEPT eR ~NRA ~CNb DEPT RNRA FCNb GR RNRA PCNb RNRI FCNb ~00 0000 hbo 99 2500 DT -999 2500 ~OB -999 2500 -999 ~500 ~PHI -999 ~500 ~R 49O0 -999 -999 -999 -999 -999 0000 25o0 2500 25O 250~ 2500 GR 4800,0000 hbo -999,2500 DT -999,2500 DT -999,2500 RHOM -~99.2500 ~PHI -99'2500 ~R 470'0 0000 ~b -999 -999 99:9 -999 2500. GR -999 999 2500 GR 2500 DRHO ,2500 PEF ,0625 -999,2500 SP -999,2500 DT %999.2500 GR 999,2500 NRAT -999,2500 -999 !500 -999 !500 5oo 999 !500 -999 2500 -999 2500 bbs -999 2500 GR -999 2500 GR -q99 2500 DEHO -999 2500 PEr 39 9687 -999 2500 SP -999 2500 DT -999 2500 GR :999 2500 NRAT 999 2500 NCNL -999,2500 -999~ .999.~O0 oo -999. O0 8 99'2500 GR '99,2500 DRHO :999 ~500 999 ~500 -999 !500 -999 !500 -999 2500 25:00 /bbs '999 -999 2500 2500 OR -999 2500 DT -999 2500 -999 -999 ~00 9687 ~ ,S 999 -999 9' N{ 9 5VP OIO,H02 VERIFICATION LISTING PAGE RNRA -999 2500 FCNL -999~2500 DEPT ~200 OR 999 GR -999 CAb! -999 RNRA -999 rCNb -999 -999.2500 PEF 32,4063 GE -999 GR -999 ~CNb -999 25 999 2500 RHOB 99 2500 NPHI -999 250O GE 46 EPT R RNRA ~CNb ~000, -.999 '9.99 ..¢ 2500 bbs 2500 GR 2500 GR 2500 DRHO 2500 PEF 9500 -999,2500 NCNb -999,[500 SP -999. 500 DT =999,2500 GE '999.2500 NRAT -999.2500 NCNb 0000 bbD -999,2500 LbS -999 2500 DT '.999,~ ~ GR ~999 500 GR -999 soo .9 . SOOoo 2500 NPH! 999,25 P£F -999 2500 ~E 28.843? 0000 ;999 2500 LbS 999 2500 SP 250 NRAT 5O0o ~CNb PEr -999 ,2500 SP 500 DT 2500 NCNb -999.2500 -999 2500 -999 2500 -999 2500 -999 2500 -q99 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -99c~ 2500 -99 2500 :999,2500 9:,99 , 25.00 -999 2500 999 9~ -9 9' 9 -9 -9' -9 LYP 010,~02 YER1FICATION LISTING PAGE GR ~999,2500 ~T ~N~A g99,2500 NPNI FCNb -099,~500 GR DEDT 3400 GR -999 GR -999 CAbI -999 RN.A -999 FCNb -999 DEPT 3300 GR -999 GR -999 RNRA ~CN~ -999 DEDT 3.200 DEPT.3~O0 99,9 F. CNb 99 -999,2500 GR -q99,2500 DRHO -999,2500 PEP 35,i875 00o0 bbD -999 2500 DT -999 500 D~ -q99 500 RHOB -999 2500 NpH~ -999 2500 GE 0000 bbD -999 2500 O~ ;999 2500 999 2500 .HOB -99~ 2500 NPHZ -999 2500 GR 48 2500. '~ .{ 2500 LbS 2500 GR 2500 GR 2500 ORHO 2500 PEr 3438 2500 bbs 2500 GR 2500 GR 500 DRHO 500 PEr 3750 2500 NPHI 99 2500 -999,2500 GR -999,2500 NRAT -999'2500 NCNb -999 -999 -999 -999 -999 -999,2500 -999,2500 -999,2500 2500 SP 2500 DT 2500 GR 2500 NRAT 2500 NCN[a -999,2500 SP -999,~500 DT '"'999,2500 "999.2500 NRAT -999 ~2500 NCNb -999 -999 -999 -999 -999 [500 5OO 2500 ~500 500 PEF -999,.2500 NCNb -999 -999 -999 -999 -999 2500 25~0 25 0 2500 2500 -999 '999 -999 "999 -999 2500 2500 2500 250O 2500 LbO ~9 2-500: 5P "999:2500 L88 -999 9 NPH 9 tVP Oi0,H02 YERIFICATION LISTING PAGE 15 DEPT GR CALl RNRA FCN6 DEPT ?CN6 DEPT GR OR CALl RNRA FCN6 2700 000o L6D -999 2500 DT -999 2500 OT -999 2500 RHOB -ggg 2500 NPHI -ggg 250O CR ~600,0000 ibp 999;2500 D~ -999,2500 DT -999,2500 RHOB :999,2500 NPHI 999,~500 ~R 2500 0000 66P -g9g 2500 DT -999 2500 DT ~999 2500 RHO~ -999 2500 GR -999 2500 L6S ~999 2500 999 2500 999 2500 999 2500 19 5000 -99g 2500 bbs ~999 2500 GR -999 2500 GR -999 2500 DRHO -999 2500 PEF 32 2813 -999,2500 8P -999,2500 ~T -999;'2500 GR -.999,2500 NRA'I' 999;2500 NCNb -999 -999 -999 -999 -999 -999 2500 bbs -999 2500 - 99 soo :999 2500 DRHO ,999 25oo 14 9062 2500 sP 2500 DT 2500 GR 2500 NRAT 2500 NCNb -999 2500 SP :999 2500 NRAI 999 25,00 NCN6 DEPT 2480 2500 [~bS -999 ~R ~,999 2500. GR. ' .-99,9 -q -999 '999 PE? -999 2500 GR 2500 2500 NCI~L '99'9 2500 -999 25O0 -999 2500 -999 2500 -999 2500 -999,2500 -999,2500 =999,2500 -999,2500 '999.2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 O0 LVP OlO,H02 VERfFICATION LISTING PAGE 16 ORIGIN RE~b NAM~ ~REEL ID CONTINUATION # ;01 NEXT REEb NAME ~ COMMENTS ~LI~RARY TAPE EOF ********** EOF